8 Fire research report – Smoke Alarms in Homes: Stage 2

Page 1

〔图〕NSWGOVERNMENT\n

Fire & Rescue NSW

Fire research report

Smoke Alarms in Homes: Stage 2

〔图〕插图 This fire research report provides an analysis of smoke alarm performance with respect to type, position, location and toxic gas tenability limits in simulated residential fires

Fire research report – Smoke Alarms in Homes: Stage 2

Page 2

VersionDateReviewed byAuthorised by
Version A10/12/2017Mark Whybro"This file is not in the file.

Document ID: Version A

Document Authors:

Kim Thai, Research Officer, Fire Investigation and Research Unit

Superintendent Jeremy Fewtrell, Manager Fire Investigation and Research Unit

SO Morgan Cook, Fire Research Team Leader, Fire Investigation and Research Unit

SF David O'Brien, Fire Research Officer, Fire Investigation and Research Unit

Pheo Duong, Research Assistant, Fire Investigation and Research Unit

Mark Whybro, Assistant Commissioner Community Safety

Acknowledgements

We would like to acknowledge the support of the Australian Building Codes Board (ABCB) in the funding half of the costs of this study.

We would also like to thank the following individuals and organisations who contributed their time, expertise, and technical and operational support in Stage 2 of this project:

· Fire Investigation & Research Unit (FIRU) – SO Morgan Cook, Diana Cornish, SF Bernard Daly, James Du, Pheo Duong, LSO Colin Eldridge, QF Michelle Engelsman, SO Phillip Etienne, Supt Jeremy Fewtrell, LSO Michael Forbes, A/Supt Graham Kingsland, SF David O'Brien, SO Wayne Schweickle, Kim Thai, SF Joel Walton.

● Community Safety – Assistant Commissioner Mark Whybro, Chief Superintendent Chris Lewis, Rachel Hughes

· Fire Fighting Operational Training (FFOT), Londonderry

· Bill Nastevski – Facilities Management (COMSER)

· CSIRO, Fire Systems and Acoustics – Dr Christopher Preston, Alex Tang, Rex Pollard

· ABCB – Dr Brian Ashe

· Brooks Alarms – Chris Orr

· System Sensor, Honeywell Alarms – Phillip Bush

· Chubb/Quell Alarms – David Laundry

· First - David Isaac

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Executive Summary

Modern day furnishings and building materials used in homes have dramatically changed the dynamics of residential fires. The combustion of widely used synthetic materials produces

faster fires with higher levels of heat and toxic smoke than natural materials, leading to

significantly decreased tenability windows for the safe egress of residents. Functional smoke alarms remain the primary means of alerting occupants to fires; however, questions arise as to their effectiveness in the modern home and whether the type and location of smoke

alarms play a role.

In 2014, FRNSW commenced a research project to assess the effectiveness of residential

smoke alarms. The project, conducted by the Fire Investigation & Research Unit (FIRU),

sought to assess any differences in performance between photoelectric, ionisation and dualsensor smoke alarms in their responses to smouldering and flaming fires. A key focus of the research was assessing whether smoke alarms provided adequate notification to allow

occupants to exit a dwelling before tenability limits for temperature and toxic gases were

reached. A comprehensive literature review and analysis of FRNSW incident data for the

preceding 15 years was completed before an initial series of 10 research burns were

conducted in a full scale replica residence built at the FIRU Fire Research Facility at

Londonderry, NSW. The research identified that ionisation alarms were inferior to

photoelectric and dual alarms in most fire scenarios, and that current smoke alarms failed to provide sufficient notification for safe egress when located only in the Hallway as required

under current legislation.

In response to the report, the Australian Building Codes Board (ABCB) commissioned a

critical review of the FRNSW research and other existing literature by the Centre for

Environmental and Risk Engineering at Victoria University. The review identified that the

FRNSW smoke alarm research was based on too few tests, did not consider an adequate

range of fire scenarios, and that the ignition methods were not representative of real

scenarios.

Based on feedback from the ABCB-commissioned review, FRNSW conducted a further

series of tests, which included:

• Four smoke alarm types: photoelectric, ionisation, dual-sensor (photoelectric and ionisation) and multi-criteria (photoelectric and heat);

• A total of 48 smoke alarms, in clusters of four, in various locations within the

residence. This included the ceiling, wall and dead space positions in each

bedroom, hallway and living space.

• 27 test scenarios, including 10 smouldering fires, 13 flaming fires and four nuisance tests. Each scenario was repeated three times.

Testing found that of the four alarm types tested, dual-sensor alarms were overall the

quickest to activate, while only ionisation alarms activated earlier than dual alarms in fast

flaming fires.

The tests also revealed that non-activation rates were high for photoelectric and multi-criteria alarms, while ionisation and dual alarms were more likely to activate due to nuisance

sources such as cooking fumes, cigarette smoke, and burning incense.

Analysis of the levels of toxic gases in the bedrooms and along the path of egress revealed that overall smoke alarm performance was poor in terms of the provision of adequate

warning for the safe egress of occupants. It was found that often tenability limits were

reached in the room of origin before hallway alarms were activated. Hallway alarms did not activate at all when the door to the room of origin was closed. This reinforces the

recommendations by FRNSW in Stage 1, that smoke alarms be required in all hallways,

bedrooms and living spaces, and should be interconnected (Engelsman, 2015).

Smoke alarms are an essential component in a suite of fire safety measures used to protect occupants from residential fires. The results indicate that current technologies are incapable of providing sufficient warning in flaming fires and that there is a need to improve tenability performance of smoke alarms in smouldering fires where smoke alarms have the potential to provide notification for the safe egress of occupants.

Considering the findings of the study, FRNSW notes a number of measures that can be

implemented to improve fire safety in residential settings:

• Smoke alarms required in every living space, bedroom and hallway

• All smoke alarms within a residence to be interconnected

• Improvement of smoke alarm performance by including toxic tenability performance requirements in the standards, and

• The use of automated fire suppression systems (home sprinklers) to be used to mitigate fast flaming fires in residences.

Table of Contents

Acknowledgements ............................................................................................................... 2

Executive Summary .............................................................................................................. 3

Nomenclature ....................................................................................................................... 7

List of Figures ....................................................................................................................... 8

List of Tables ...................................................................................................................... 20

  1. Introduction ..................................................................................................................... 25
  1. Methodology ................................................................................................................... 26
  1. 1 Burn unit and furnishings ............................................................................................................ 26
  1. 2 Test scenarios ............................................................................................................................. 28
  1. 3 Fire ignition and extinguishment ................................................................................................. 29
  1. 4 Smoke alarms ............................................................................................................................. 30
  1. 5 Instrumentation ........................................................................................................................... 32
  1. 6 Data Analysis .............................................................................................................................. 32
  1. 7 Study Limitations ......................................................................................................................... 33
  1. Results ............................................................................................................................ 33
  1. 1 SCENARIO 1: Smouldering bedding fire in Bedroom 1, door closed ......................................... 33
  1. 2 SCENARIO 2: Smouldering bedding fire in Bedroom 2, doors open ......................................... 41
  1. 3 SCENARIO 3: Smouldering lounge fire in lounge room, Bedroom 2 door closed ...................... 47
  1. 4 SCENARIO 5: Flaming bedding fire in Bedroom 2, bedroom doors open .................................. 53
  1. 5 SCENARIO 7a: Smouldering bedding fire in Bedroom 1, doors open ....................................... 59
  1. 6 SCENARIO 7b: Smouldering bedding fire in Bedroom 1, doors open, cigarette ignition ........... 65
  1. 7 SCENARIO 10: Flaming fire in Bedroom 1, bedroom doors open ............................................. 70
  1. 8 SCENARIO 11: Smouldering electrical fire in kitchen, bedroom doors open ............................. 75
  1. 9 SCENARIO 12: Flaming electrical fire in kitchen, bedroom doors open .................................... 80
  1. 10 SCENARIO 13: Flaming lounge fire in lounge room, bedroom doors open ............................. 86
  1. 11 SCENARIO 14a: Smouldering lounge fire in lounge room, bedroom doors open .................... 92
  1. 12 SCENARIO 14b: Smouldering lounge fire in lounge room, bedroom doors open .................... 97
  1. 13 SCENARIO 15: Flaming paper fire in lounge room, bedroom doors open ............................. 103
  1. 14 SCENARIO 16: Flaming chair fire in lounge, bedroom doors open ....................................... 109
  1. 15 SCENARIO 17: Flaming cooking oil fire in kitchen, bedroom doors open .............................. 115
  1. 16 SCENARIO 18: Flaming tea towel fire in kitchen, bedroom doors open ................................ 121
  1. 17 SCENARIO 19: Smouldering iron in the laundry, bedroom doors open ................................. 127
  1. 18 SCENARIO 20: Smouldering iron in the laundry, laundry door closed ................................... 133
  1. 19 SCENARIO 22: Flaming bedding in Bedroom 1, Bedroom 1 door closed.............................. 139
  1. 20 SCENARIO 23: Flaming paper fire in Bedroom 2, bedroom doors open ............................... 145
  1. 21 SCENARIO 24: Flaming paper fire in Bedroom 2, Bedroom 1 closed ................................... 151
  1. 22 SCENARIO 25: Flaming chair in hallway, bedroom doors open ............................................ 157
  1. 23 SCENARIO 26: Smouldering upholstered chair in hallway, bedroom doors open ................. 163
  1. 24 SCENARIO 27: Nuisance test - Burnt toast in the kitchen ..................................................... 169
  1. 25 SCENARIO 28: Nuisance test - Steam from the bathroom .................................................... 170
  1. 26 SCENARIO 29: Nuisance test – Cigarettes in the Lounge room ............................................ 171
  1. 27 SCENARIO 30: Nuisance test – Incense candles in the Lounge ........................................... 172
  1. Analysis and Discussion................................................................................................ 173
  1. 1 Activation times by alarm type .................................................................................................. 173
  1. 2 Smoke alarm activations in smouldering tests .......................................................................... 174
  1. 2 Smoke alarm activations in flaming tests .................................................................................. 174
  1. 2 Non-activations and nuisance alarms ....................................................................................... 175
  1. 3 Toxic tenability .......................................................................................................................... 177
  1. Conclusions and Recommendations ............................................................................. 179
  1. References ................................................................................................................... 180

APPENDIX A Furnishing materials used in testing ............................................................ 182

APPENDIX B Tenability Criteria ........................................................................................ 183

APPENDIX C CSIRO Smoke Alarm Verification Test Reports .......................................... 185

Nomenclature

ANOVA

Analysis of variance. Variance is a measure based on the squared deviations of individual scores/observations from the mean. ANOVA analyses the

differences between independent group means.

F

F statistic, ratio of two mean square values

M

Mean value, the average value of a distribution

N

Sample size or population size

p

Statistical significance level p = α

SD

Standard deviation, a measure of variability defined as the square root of the variance

χ2

Chi-square statistic, a measurement of how results compare with expected values.

Fire research report – Smoke Alarms in Homes: Stage 2

Page 8

List of Figures

Figure 1 Layout of two-bedroom residence showing positions of smoke alarms thermocouples and gas probes $\blacksquare$ $\ldots$ 26

Figure 2 Soldering iron and cotton batting sheets used to initiate smouldering fires $\ldots$ 29

Figure 3 Butane BBQ lighter used in lighting flaming fires, pictured here used in lighting incense $\ldots$ 30

Figure 4 Diagram defining the dead air space and correct smoke alarm placement according to the Australian Building Codes Board (2016, p. 279) $\ldots$ 31

Figure 5 Wiring to the smoke alarm sounder $\ldots$ 31

Figure 6 Before (left) and after (right) photographs of Scenario 1, Tests 1 (top), 2 (middle) and 3 (bottom) $\ldots$ 34

Figure 7 Scenario 1, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. $\ldots$ 36

Figure 8 Scenario 1, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED... 37 Figure 9 Scenario 1, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. $\ldots$ 37

Figure 10 Scenario 1, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and FED. $\ldots$ 38

Figure 11 Scenario 1, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. $\ldots$ 38

Figure 12 Scenario 1, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED... 39 Figure 13 Before (left) and after (right) photographs of Scenario 2, Tests 1 (top), 2 (middle) and 3 (bottom) ......................................................................................................................................................................................................................

Figure 14 Scenario 2, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED. $\ldots$ 43

Figure 15 Scenario 2, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED... 43

Figure 16 Scenario 2, Test 2 smoke alarm activation times by type in comparison with

calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 44

Figure 17 Scenario 2, Test 2 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 44 Figure 18 Scenario 2, Test 3 smoke alarm activation times by type in comparison with

calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 45

Figure 19 Scenario 2, Test 3 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 45 Figure 20 Before (left) and after (right) photographs of Scenario 3, Tests 1 (top), 2 (middle)

and 3 (bottom)..................................................................................................................... 47

Figure 21 Scenario 3, Test 1 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 49

Figure 22 Scenario 3, Test 1 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 49 Figure 23 Scenario 3, Test 2 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 50

Figure 24 Scenario 3, Test 2 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 50 Figure 25 Scenario 3, Test 3 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 51

Figure 26 Scenario 3, Test 3 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 51 Figure 27 Before (left) and after (right) photographs of Scenario 5, Tests 1 (top), 2 (middle)

and 3 (bottom)..................................................................................................................... 53

Figure 28 Scenario 5, Test 1 smoke alarm activation times by type in comparison with

calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 55

Figure 29 Scenario 5, Test 1 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 55

Figure 30 Scenario 5, Test 2 smoke alarm activation times by type in comparison with

calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 56

Figure 31 Scenario 5, Test 2 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 56 Figure 32 Scenario 5, Test 3 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 57

Figure 33 Scenario 5, Test 3 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 57 Figure 34 Before (left) and after (right) photographs of Scenario 7a, Tests 1 (top), 2 (middle)

and 3 (bottom)..................................................................................................................... 59

Figure 35 Scenario 7a, Test 1 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 61

Figure 36 Scenario 7a, Test 1 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 61 Figure 37 Scenario 7a, Test 2 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 62

Figure 38 Scenario 7a, Test 2 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 62 Figure 39 Scenario 7a, Test 3 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 63

Figure 40 Scenario 7a, Test 3 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 63 Figure 41 Before (left) and after (right) photographs of Scenario 7b, Tests 1 (top), 2 (middle)

and 3 (bottom)..................................................................................................................... 65

Figure 42 Scenario 7b, Test 1 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 66

Figure 43 Scenario 7b, Test 1 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 67

Figure 44 Scenario 7b, Test 2 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 67

Figure 45 Scenario 7b, Test 2 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 68 Figure 46 Scenario 7b, Test 3 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 68

Figure 47 Scenario 7b, Test 3 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 69 Figure 48 Before (left) and after (right) photographs of Scenario 10, Tests 1 (top), 2 (middle)

and 3 (bottom)..................................................................................................................... 70

Figure 49 Scenario 10, Test 1 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 71

Figure 50 Scenario 10, Test 1 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 72 Figure 51 Scenario 10, Test 2 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 72

Figure 52 Scenario 10, Test 2 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 73 Figure 53 Scenario 10, Test 3 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 73

Figure 54 Scenario 10, Test 3 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 74 Figure 55 Before (left) and after (right) photographs of Scenario 11, Tests 1 (top), 2 (middle)

and 3 (bottom)..................................................................................................................... 75

Figure 56 Scenario 11, Test 1 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 76

Figure 57 Scenario 11, Test 1 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 77

Figure 58 Scenario 11, Test 2 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 77

Figure 59 Scenario 11, Test 2 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 78 Figure 60 Scenario 11, Test 3 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 78

Figure 61 Scenario 11, Test 3 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 79 Figure 62 Before (left) and after (right) photographs of Scenario 12, Tests 1 (top), 2 (middle)

and 3 (bottom)..................................................................................................................... 80

Figure 63 Scenario 12, Test 1 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 82

Figure 64 Scenario 12, Test 1 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 82 Figure 65 Scenario 12, Test 2 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 83

Figure 66 Scenario 12, Test 2 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 83 Figure 67 Scenario 12, Test 3 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 84

Figure 68 Scenario 12, Test 3 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 84 Figure 69 Before (left) and after (right) photographs of Scenario 13, Tests 1 (top), 2 (middle)

and 3 (bottom)..................................................................................................................... 86

Figure 70 Scenario 13, Test 1 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 88

Figure 71 Scenario 13, Test 1 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 88

Figure 72 Scenario 13, Test 2 smoke alarm activation times by type in comparison with

calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 89

Figure 73 Scenario 13, Test 2 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 89 Figure 74 Scenario 13, Test 3 smoke alarm activation times by type in comparison with

calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 90

Figure 75 Scenario 13, Test 3 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 90 Figure 76 Before (left) and after (right) photographs of Scenario 14a, Tests 1 (top), 2

(middle) and 3 (bottom). ...................................................................................................... 92

Figure 77 Scenario 14a, Test 1 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 93

Figure 78 Scenario 14a, Test 1 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 94 Figure 79 Scenario 14a, Test 2 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 94

Figure 80 Scenario 14a, Test 2 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 95 Figure 81 Scenario 14a, Test 3 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 95

Figure 82 Scenario 14a, Test 3 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 96 Figure 83 Before (left) and after (right) photographs of Scenario 14b, Tests 1 (top), 2

(middle) and 3 (bottom). ...................................................................................................... 97

Figure 84 Scenario 14b, Test 1 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

........................................................................................................................................... 99

Figure 85 Scenario 14b, Test 1 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 99

Figure 86 Scenario 14b, Test 2 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 100

Figure 87 Scenario 14b, Test 2 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 100 Figure 88 Scenario 14b, Test 3 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 101

Figure 89 Scenario 14b, Test 3 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 101 Figure 90 Before (left) and after (right) photographs of Scenario 15, Tests 1 (top), 2 (middle)

and 3 (bottom)................................................................................................................... 103

Figure 91 Scenario 15, Test 1 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 105

Figure 92 Scenario 15, Test 1 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 105 Figure 93 Scenario 15, Test 2 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 106

Figure 94 Scenario 15, Test 2 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 106 Figure 95 Scenario 15, Test 3 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 107

Figure 96 Scenario 15, Test 3 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 107 Figure 97 Before (left) and after (right) photographs of Scenario 16, Tests 1 (top), 2 (middle)

and 3 (bottom)................................................................................................................... 109

Figure 98 Scenario 16, Test 1 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 111

Figure 99 Scenario 16, Test 1 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 111

Figure 100 Scenario 16, Test 2 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 112

Figure 101 Scenario 16, Test 2 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 112 Figure 102 Scenario 16, Test 3 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 113

Figure 103 Scenario 16, Test 3 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 113 Figure 104 Before (left) and during (right) photographs of Scenario 17, Tests 1 (top), 2

(middle) and 3 (bottom). .................................................................................................... 115

Figure 105 Scenario 17, Test 1 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 117

Figure 106 Scenario 17, Test 1 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 117 Figure 107 Scenario 17, Test 2 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 118

Figure 108 Scenario 317, Test 2 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 118 Figure 109 Scenario 17, Test 3 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 119

Figure 110 Scenario 17, Test 3 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 119

Figure 111 Images of Scenario 18, Tests 1 (top), 2 (middle) and 3 (bottom). .................... 121

Figure 112 Scenario 18, Test 1 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 123

Figure 113 Scenario 18, Test 1 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 123

Figure 114 Scenario 18, Test 2 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 124

Figure 115 Scenario 18, Test 2 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 124 Figure 116 Scenario 18, Test 3 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 125

Figure 117 Scenario 18, Test 3 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 125 Figure 118 Before (left) and after (right) photographs of Scenario 19, Tests 1 (top), 2

(middle) and 3 (bottom). .................................................................................................... 127

Figure 119 Scenario 19, Test 1 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 129

Figure 120 Scenario 19, Test 1 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 129 Figure 121 Scenario 19, Test 2 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 130

Figure 122 Scenario 317, Test 2 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 130 Figure 123 Scenario 19, Test 3 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 131

Figure 124 Scenario 19, Test 3 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 131 Figure 125 Before (left) and after (right) photographs of Scenario 3, Tests 1 (top), 2 (middle)

and 3 (bottom)................................................................................................................... 133

Figure 126 Scenario 20, Test 1 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 135

Figure 127 Scenario 20, Test 1 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 135

Figure 128 Scenario 20, Test 2 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 136

Figure 129 Scenario 317, Test 2 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 136 Figure 130 Scenario 20, Test 3 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 137

Figure 131 Scenario 20, Test 3 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 137

Figure 132 Images of Scenario 22, Tests 1 (top), 2 (middle) and 3 (bottom). .................... 139

Figure 133 Scenario 22, Test 1 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 141

Figure 134 Scenario 22, Test 1 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 141 Figure 135 Scenario 22, Test 2 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 142

Figure 136 Scenario 22, Test 2 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 142 Figure 137 Scenario 22, Test 3 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 143

Figure 138 Scenario 22, Test 3 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 143

Figure 139 Images of Scenario 23, Tests 1 (top), 2 (middle) and 3 (bottom). .................... 145

Figure 140 Scenario 23, Test 1 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 147

Figure 141 Scenario 23, Test 1 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 147 Figure 142 Scenario 23, Test 2 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 148

Figure 143 Scenario 23, Test 2 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 148 Figure 144 Scenario 23, Test 3 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 149

Figure 145 Scenario 23, Test 3 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 149

Figure 146 Images of Scenario 24, Tests 1 (top), 2 (middle) and 3 (bottom). .................... 151

Figure 147 Scenario 24, Test 1 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 153

Figure 148 Scenario 24, Test 1 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 153 Figure 149 Scenario 24, Test 2 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 154

Figure 150 Scenario 24, Test 2 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 154 Figure 151 Scenario 24, Test 3 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 155

Figure 152 Scenario 24, Test 3 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 155

Figure 153 Images of Scenario 25, Tests 1 (top), 2 (middle) and 3 (bottom). .................... 157

Figure 154 Scenario 25, Test 1 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 159

Figure 155 Scenario 25, Test 1 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 159 Figure 156 Scenario 25, Test 2 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 160

Figure 157 Scenario 25, Test 2 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 160

Figure 158 Scenario 25, Test 3 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 161

Figure 159 Scenario 25, Test 3 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 161

Figure 160 Images of Scenario 26, Tests 1 (top), 2 (middle) and 3 (bottom). .................... 163

Figure 161 Scenario 26, Test 1 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 165

Figure 162 Scenario 26, Test 1 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 165 Figure 163 Scenario 26, Test 2 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 166

Figure 164 Scenario 26, Test 2 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 166 Figure 165 Scenario 26, Test 3 smoke alarm activation times by type in comparison with

calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

......................................................................................................................................... 167

Figure 166 Scenario 26, Test 3 smoke alarm activation times by type in comparison with

calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 167

Figure 167 Scenario 27 set up and result (Test 1) ............................................................. 169

Figure 168 Scenario 28 set up .......................................................................................... 170

Figure 169 Scenario 29 set up .......................................................................................... 171

Figure 170 Scenario 30 set up .......................................................................................... 172

List of Tables

Table 1 Test scenarios suggested by Novozhilov et al., (2015) [* denotes scenarios excluded

in Stage 2] ........................................................................................................................... 27

Table 2 Stage 2 Test scenarios and configurations ............................................................. 28

Table 3 Scenario 1 smoke alarm activation times (min:sec). Empty cells indicate nonactivations. .......................................................................................................................... 34

Table 4 Scenario 1 Time after ignition (min:sec) at which tenability limits were reached 1.5

metres ................................................................................................................................. 36

Table 5 Scenario 1 Available Safe Egress Times (ASETs) in minutes for individual smoke

alarms according to Bedroom 1 tenability limits. Note: ASET≤0 is no ASET, 0

insufficient, ASET≥2.25 is sufficient. ................................................................................... 40

Table 6 Scenario 1 atmospheric conditions ......................................................................... 40

Table 7 Scenario 2 smoke alarm activation times (min:sec) ................................................ 42

Table 8 Scenario 2 Time after ignition (min:sec) at which tenability limits were reached 1.5

metres ................................................................................................................................. 42

Table 9 Scenario 2 Available Safe Egress Times (ASETs) in minutes for individual smoke

alarms according to Bedroom 2 tenability limits. Note: ASET≤0 is no ASET, 0

insufficient, ASET≥2.25 is sufficient. ................................................................................... 46

Table 10 Scenario 2 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0

insufficient, ASET≥2.25 is sufficient. ................................................................................... 46

Table 11 Scenario 2 atmospheric conditions ....................................................................... 46

Table 12 Scenario 3 smoke alarm activation times (min:sec) .............................................. 48

Table 13 Scenario 3 Time after ignition (min:sec) at which tenability limits were reached 1.5

metres ................................................................................................................................. 48

Table 14 Scenario 3 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0

insufficient, ASET≥2.25 is sufficient. ................................................................................... 52

Table 15 Scenario 3 atmospheric conditions ....................................................................... 52

Table 16 Scenario 5 smoke alarm activation times (min:sec) .............................................. 54

Table 17 Scenario 5 Time after ignition (min:sec) at which tenability limits were reached 1.5

metres ................................................................................................................................. 54

Table 18 Scenario 5 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Bedroom 2 tenability limits. Note: ASET≤0 is no ASET, 0

insufficient, ASET≥2.25 is sufficient. ................................................................................... 58

Table 19 Scenario 5 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0

insufficient, ASET≥2.25 is sufficient. ................................................................................... 58

Table 20 Scenario 5 atmospheric conditions ....................................................................... 58

Table 21 Scenario 7a smoke alarm activation times (min:sec) ............................................ 60

Table 22 Scenario 7a Time after ignition (min:sec) at which tenability limits were reached 1.5

metres ................................................................................................................................. 60

Table 23 Scenario 7a Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Bedroom 1 tenability limits. Note: ASET≤0 is no ASET, 0

insufficient, ASET≥2.25 is sufficient. ................................................................................... 64

Table 24 Scenario 7a atmospheric conditions ..................................................................... 64

Table 25 Scenario 7b smoke alarm activation times (min:sec) ............................................ 66

Table 26 Scenario 7b Time after ignition (min:sec) at which tenability limits were reached 1.5

metres ................................................................................................................................. 66

Table 27 Scenario 7b Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Bedroom 1 tenability limits. Note: ASET≤0 is no ASET, 0

insufficient, ASET≥2.25 is sufficient. ................................................................................... 69

Table 28 Scenario 7b atmospheric conditions ..................................................................... 69

Table 29 Scenario 10 smoke alarm activation times (min:sec) ............................................ 71

Table 30 Scenario 10 Time after ignition (min:sec) at which tenability limits were reached 1.5

metres ................................................................................................................................. 71

Table 31 Scenario 10 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Bedroom 1 tenability limits. Note: ASET≤0 is no ASET, 0

insufficient, ASET≥2.25 is sufficient. ................................................................................... 74

Table 32 Scenario 10 atmospheric conditions ..................................................................... 74

Table 33 Scenario 11 smoke alarm activation times (min:sec) ............................................ 76

Table 34 Scenario 11 Time after ignition (min:sec) at which tenability limits were reached 1.5

metres ................................................................................................................................. 76

Table 35 Scenario 11 atmospheric conditions ..................................................................... 79

Table 36 Scenario 12 smoke alarm activation times (min:sec) ............................................ 81

Table 37 Scenario 12 Time after ignition (min:sec) at which tenability limits were reached 1.5

metres ................................................................................................................................. 81

Table 38 Scenario 12 atmospheric conditions ..................................................................... 85

Table 39 Scenario 13 smoke alarm activation times (min:sec) ............................................ 87

Table 40 Scenario 13 Time after ignition (min:sec) at which tenability limits were reached 1.5

metres ................................................................................................................................. 87

Table 41 Scenario 13 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0

insufficient, ASET≥2.25 is sufficient. ................................................................................... 91

Table 42 Scenario 13 atmospheric conditions ..................................................................... 91

Table 43 Scenario 14a smoke alarm activation times (min:sec) .......................................... 93

Table 44 Scenario 14a Time after ignition (min:sec) at which tenability limits were reached

  1. 5 metres ........................................................................................................................... 93

Table 45 Scenario 14a Available Safe Egress Times (ASETs) in minutes for individual

smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET,

0

Table 46 Scenario 14a atmospheric conditions ................................................................... 96

Table 47 Scenario 14b smoke alarm activation times (min:sec) .......................................... 98

Table 48 Scenario 14b Time after ignition (min:sec) at which tenability limits were reached

  1. 5 metres ........................................................................................................................... 98

Table 49 Scenario 14b Available Safe Egress Times (ASETs) in minutes for individual

smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET,

0

Table 50 Scenario 14b atmospheric conditions ................................................................. 102

Table 51 Scenario 15 smoke alarm activation times (min:sec) .......................................... 104

Table 52 Scenario 15 Time after ignition (min:sec) at which tenability limits were reached 1.5

metres ............................................................................................................................... 104

Table 53 Scenario 15 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0

insufficient, ASET≥2.25 is sufficient. ................................................................................. 108

Table 54 Scenario 15 atmospheric conditions ................................................................... 108

Table 55 Scenario 16 smoke alarm activation times (min:sec) .......................................... 110

Table 56 Scenario 16 Time after ignition (min:sec) at which tenability limits were reached 1.5

metres ............................................................................................................................... 110

Table 57 Scenario 16 atmospheric conditions ................................................................... 114

Table 58 Scenario 17 smoke alarm activation times (min:sec) in the Hallway and Lounge

room ................................................................................................................................. 116

Table 59 Scenario 17 Time after ignition (min:sec) at which tenability limits were reached 1.5

metres ............................................................................................................................... 116

Table 60 Scenario 17 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0

insufficient, ASET≥2.25 is sufficient. ROO alarms in this scenario were the lounge room

alarms which were nearest to the kitchen. ......................................................................... 120

Table 61 Scenario 17 atmospheric conditions ................................................................... 120

Table 62 Scenario 18 smoke alarm activation times (min:sec) in the Hallway and Lounge

room ................................................................................................................................. 122

Table 63 Scenario 18 Time after ignition (min:sec) at which tenability limits were reached 1.5

metres ............................................................................................................................... 122

Table 64 Scenario 18 atmospheric conditions ................................................................... 126

Table 65 Scenario 19 smoke alarm activation times (min:sec) in the Hallway and Lounge

room. ................................................................................................................................ 128

Table 66 Scenario 19 Time after ignition (min:sec) at which tenability limits were reached 1.5

metres ............................................................................................................................... 128

Table 67 Scenario 19 atmospheric conditions ................................................................... 132

Table 68 Scenario 20 smoke alarm activation times (min:sec) in the Hallway and Lounge

room. ................................................................................................................................ 134

Table 69 Scenario 20 Time after ignition (min:sec) at which tenability limits were reached 1.5

metres ............................................................................................................................... 134

Table 70 Scenario 20 atmospheric conditions ................................................................... 138

Table 71 Scenario 22 smoke alarm activation times (min:sec) .......................................... 140

Table 72 Scenario 22 Time after ignition (min:sec) at which tenability limits were reached 1.5

metres ............................................................................................................................... 140

Table 73 Scenario 22 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0

insufficient, ASET≥2.25 is sufficient. ................................................................................. 144

Table 74 Scenario 22 atmospheric conditions ................................................................... 144

Table 75 Scenario 23 smoke alarm activation times (min:sec) .......................................... 146

Table 76 Scenario 23 Time after ignition (min:sec) at which tenability limits were reached 1.5

metres ............................................................................................................................... 146

Table 77 Scenario 23 atmospheric conditions ................................................................... 150

Table 78 Scenario 24 smoke alarm activation times (min:sec) in the Hallway and Bedroom 2

......................................................................................................................................... 152

Table 79 Scenario 24 Time after ignition (min:sec) at which tenability limits were reached 1.5

metres ............................................................................................................................... 152

Table 80 Scenario 24 atmospheric conditions ................................................................... 156

Table 81 Scenario 25 smoke alarm activation times (min:sec) in the Hallway and Lounge

room ................................................................................................................................. 158

Table 82 Scenario 25 Time after ignition (min:sec) at which tenability limits were reached 1.5

metres ............................................................................................................................... 158

Table 83 Scenario 25 atmospheric conditions ................................................................... 162

Table 84 Scenario 26 smoke alarm activation times (min:sec) in the Hallway and Lounge

room ................................................................................................................................. 164

Table 85 Scenario 26 Time after ignition (min:sec) at which tenability limits were reached 1.5

metres ............................................................................................................................... 164

Table 86 Scenario 26 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0

insufficient, ASET≥2.25 is sufficient. ................................................................................. 168

Table 87 Scenario 26 atmospheric conditions ................................................................... 168

Table 88 Scenario 27 smoke alarm activation times (min:sec) .......................................... 169

Table 89 Scenario 27 atmospheric conditions ................................................................... 169

Table 90 Scenario 28 smoke alarm activation times (min:sec) .......................................... 170

Table 91 Scenario 28 atmospheric conditions ................................................................... 170

Table 92 Scenario 29 atmospheric conditions ................................................................... 171

Table 93 Scenario 30 smoke alarm activation times (min:sec) .......................................... 172

Table 94 Scenario 30 atmospheric conditions ................................................................... 172

Table 95 Smoke alarm non-activation (rate) by alarm type ............................................... 175

Table 96 Smoke alarm ASET before tenability limit is reached in the Bedroom................. 178

Table 97 Smoke alarm ASET before tenability limit is reached in the Hallway .................. 178

  1. Introduction

Modern day furnishings and building materials used in homes have dramatically changed the dynamics of residential fires. The combustion of widely used synthetic materials produces

faster fires with higher levels of heat and toxic smoke than natural materials, leading to

significantly decreased tenability windows for the safe egress of residents. Functional smoke alarms remain the primary means of alerting occupants to fires; however, questions arise as to their effectiveness in the modern home and whether the type and location of smoke

alarms play a role.

In 2014, FRNSW commenced a research project to assess the effectiveness of photoelectric and ionisation alarms. The project, conducted by the Fire Investigation & Research Unit

(FIRU), sought to assess any differences in performance between photoelectric and

ionisation smoke alarms in their responses to smouldering and flaming fires. This research also examined the impact of smoke alarm location and the number of alarms in a dwelling on providing timely notification to occupants. A key focus of the research was assessing

whether smoke alarms provided adequate notification to allow occupants to exit a dwelling

before tenability limits for temperature and toxic gases were reached.

The research commenced with a comprehensive literature review and analysis of FRNSW

incident data for the preceding 15 years. During 2015 an initial series of 10 research burns

were conducted in a full scale replica residence built at the FIRU Fire Research Facility at

Londonderry, NSW. Following analysis of the test data a draft report (Engelsman, 2015) was produced which identified that ionisation alarms were inferior to photoelectric and dual-type sensors in most fire scenarios, and that current smoke alarms failed to provide sufficient

notification for safe egress when located only in the Hallway as required under current

legislation.

In response to the report, the Australian Building Codes Board (ABCB) commissioned a

critical review of the FRNSW research and other existing literature by the Centre for

Environmental and Risk Engineering at Victoria University (Novozhilov et al., 2015). The

review identified that the FRNSW smoke alarm research was based on too few tests, did not consider an adequate range of fire scenarios, and that the ignition methods were not

representative of real scenarios. Based on the valuable feedback from the ABCBcommissioned review (Novozhilov et al., 2015), FRNSW organised a further series of

research burns based on the scenarios suggested by (Novozhilov et al., 2015) (see Table 1).

Fire research report – Smoke Alarms in Homes: Stage 2

Page 26

This document details the methodology used in the testing, the results and provides and analysis of the findings.

2. Methodology

2.1 Burn unit and furnishings

A test burn cell was purpose-built at the FRNSW Research Facility at Londonderry, NSW for the Stage 1 testing in 2015 (Engelsman, 2015). The structure was set up as a two bedroom unit with a layout as illustrated in Figure 1 below for Stage 2 testing.

〔图〕HALLWAYGas Probe 2STOREO00TbTcLOUNGE ROOMdeskwardrobeBATHROOMofqe) 0oy,O0/LAUNDRYBEDROOM 2BEDROOM 1tablescocssssscsstabl

Figure 1 Layout of two-bedroom residence showing positions of smoke alarms ○ , thermocouples $\blacksquare$ and gas probes ■.

The frame of the residence was built from radiata pine with 16 mm fire resistant plasterboard panels lining the internal walls and ceiling. The outside of the building was lined with extra heavy duty premium wall wrap and clad with 7.5 mm plywood. The structure contains a solid timber front door and hollow core lightweight internal doors. Aluminium, glazed sliding windows were installed, ceiling heights were 2.4 m and bulkheads above doors were set at 2.1 m. The structure was roofed with a trim deck metal roof to prevent weathering.

Modern furniture and furnishings were purchased to furnish the rooms. The kitchen area was constructed from 4.5mm fibre reinforced cement sheeting for durability during testing. All rooms were carpeted with polypropylene carpet squares, except the kitchen and bathroom spaces, which were fitted with a vinyl floor covering.

Document ID: Version A

Issued: 10 Dec 2017

Fire research report – Smoke Alarms in Homes: Stage 2

Page 27

Table 1 Test scenarios suggested by Novozhilov et al., (2015) [* denotes scenarios excluded in Stage 2]

ScenarioLocationFire TypeMaterialsIgnition MethodConditions
1Bedroom 1SmoulderingBeddingCigarette/small electric heaterBedroom 1 door closed; Bedroom 2 door open;
2Bedroom 2SmoulderingBeddingCigarette/small electric heaterTwo bedroom doors open
3LoungeSmoulderingUpholstered couchCigarette/small electric heaterBedroom 1 door open; Bedroom 2 door closed
4*Bedroom 2SmoulderingBeddingCigarette/small electric heaterTwo bedroom doors open
5Bedroom 2FlamingBeddingLPG gas flameTwo bedroom doors open
6*Bedroom 1SmoulderingBeddingCigarette/small electric heaterBedroom 1 door closed; Bedroom 2 door open
7Bedroom 1SmoulderingBeddingCigarette/small electric heaterTwo bedroom doors open
8*LoungeSmoulderingUpholstered couchCigarette/small electric heaterBedroom 1 door open; Bedroom 2 door closed
9*Bedroom 2SmoulderingBeddingCigarette/small electric heaterTwo bedroom doors open
10Bedroom 1FlamingBeddingLPG gas flameTwo bedroom doors open
11KitchenSmoulderingElectrical cableLPG gas flame or alternativeAll room doors open
12KitchenFlamingElectric equipmentCartridge heater or alternativeAll room doors open
13LoungeFlamingUpholstered furnitureLPG gas flame or alternativeAll room doors open
14LoungeSmoulderingUpholstered furnitureCigarette/small electric heaterAll room doors open
15LoungeFlamingPapersLPG gas flame or alternativeAll room doors open
16LoungeFlamingWood chairLPG gas flame or alternativeAll room doors open
17KitchenFlamingCooking panLPG gas flame or alternativeAll room doors open
18KitchenFlamingClothingLPG gas flame or alternativeAll room doors open
19Laundry roomSmoulderingElectric equipmentCartridge heater or alternativeAll room doors open
20Laundry roomSmoulderingElectric equipmentCartridge heater or alternativeAll room doors open except laundry room door
21*Bedroom 1FlamingPillowLPG gas flame or alternativeAll room doors open
22Bedroom 1FlamingPillowLPG gas flame or alternativeAll room doors open except Bedroom 1 door
23Bedroom 2FlamingPaperLPG gas flame or alternativeAll room doors open
24Bedroom 2FlamingPaperLPG gas flame or alternativeAll room doors open except Bedroom 1 door
25HallFlamingWood chairLPG gas flame or alternativeAll room doors open
26HallSmoulderingUpholstered furnitureCigarette/small electric heaterAll room doors open
27KitchenNuisance sourceCooking different foodsCooking equipmentAll room doors open
28BathroomNuisance sourceSteamHot showerAll room doors open
29LoungeNuisance sourceSmoking cigarette(s)LighterAll room doors open
30LoungeNuisance sourceCandle(s)LighterAll room doors open

Document ID: Version A

Issued: 10 Dec 2017

Fire research report – Smoke Alarms in Homes: Stage 2

Page 28

2.2 Test scenarios

In consultation with the ABCB, 25 test scenarios were selected from the 30 test scenarios suggested by Novozhilov et al. (2015) to be included in the Stage 2 test series. Scenarios 4, 6, 8, 9 and 21 were discarded to avoid repetition. A further two scenarios (7b and 14b) were included to investigate cigarettes as an ignition source in smouldering fires. The final test matrix, which includes a total of 27 scenarios, is presented in Table 2 below.

Table 2 Stage 2 Test scenarios and configurations

ScenarioLocationFire TypeMaterialsIgnition MethodConditions
1Bedroom 1SmoulderingBeddingSoldering ironBedroom 1 door closed; Bedroom 2 door open;
2Bedroom 2SmoulderingBeddingSoldering ironTwo bedroom doors open
3LoungeSmoulderingUpholstered couchSoldering ironBedroom 1 door open; Bedroom 2 door closed
5Bedroom 2FlamingBeddingButane lighterTwo bedroom doors open
7aBedroom 1SmoulderingBeddingSoldering ironTwo bedroom doors open
7bBedroom 1SmoulderingBeddingCigaretteTwo bedroom doors open
10Bedroom 1FlamingBeddingButane lighterTwo bedroom doors open
11KitchenSmoulderingElectrical cableStove elementTwo bedroom doors open
12KitchenFlamingElectric equipmentToasterTwo bedroom doors open
13LoungeFlamingUpholstered furnitureButane lighterTwo bedroom doors open
14aLoungeSmoulderingUpholstered furnitureSoldering ironTwo bedroom doors open
14bLoungeSmoulderingUpholstered furnitureCigaretteTwo bedroom doors open
15LoungeFlamingPapersButane lighterTwo bedroom doors open
16LoungeFlamingWood chairButane lighterTwo bedroom doors open
17KitchenFlamingCooking panButane lighterTwo bedroom doors open
18KitchenFlamingTea towelButane lighterTwo bedroom doors open
19Laundry roomSmoulderingClothes ironClothes ironTwo bedroom doors open
20Laundry roomSmoulderingClothes ironClothes ironTwo bedroom doors open, laundry room door closed
22Bedroom 1FlamingPillowButane lighterBedroom 1 door closed; Bedroom 2 door open;
23Bedroom 2FlamingPaperButane lighterTwo bedroom doors open
24Bedroom 2FlamingPaperButane lighterBedroom 1 door closed; Bedroom 2 door open;
25HallFlamingWood chairButane lighterTwo bedroom doors open
26HallSmoulderingUpholstered chairSoldering ironTwo bedroom doors open
27KitchenNuisance sourceToastOven/GrillTwo bedroom doors open
28BathroomNuisance sourceSteamHot water urnTwo bedroom doors open
29LoungeNuisance sourceSmoking cigarettesButane lighterTwo bedroom doors open
30LoungeNuisance sourceIncenseButane lighterTwo bedroom doors open

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 29

2.3 Fire ignition and extinguishment

Smouldering fires were initiated using a 60W, 240V soldering station (ESD Safe) with temperature control (160°C to 480°C). The soldering pencil was used with the conical tip removed exposing a 30 mm long, 8 mm diameter wide heated tube, pictured in Figure 2 below. Three 15 cm x 15 cm squares of 100% pure cotton batting (or wadding) were used to support sustained smouldering in all tests. Smouldering ignition was achieved with the soldering station set to 350°C and left in contact with the batting for six minutes. The test start time was recorded as the time at which the soldering iron is first in contact with the batting material.

〔图〕插图

Figure 2 Soldering iron and cotton batting sheets used to initiate smouldering fires

Two smouldering test scenarios (7 and 14) were repeated using cigarettes as the ignition source. A single cigarette was lit using a butane-lighter and placed into position on three squares of cotton batting as in the soldering iron tests. The cigarettes were not removed during these tests and were allowed to burn until they self-extinguished (typically around 10-12 minutes duration). A lit cigarette has a heat output typically in the range of 4 to 6W when it is not actively being puffed and a tip temperature of 630-690°C when placed horizontally on an insulating surface (Babrauskas, V., 2003). The thermal energy transferred from a lit cigarette smouldering for 12 minutes can be estimated by the power output multiplied by the contact time to be 2.9-4.3 kJ. In comparison, the soldering iron set at 350°C (~72% power) for six minutes, with ~20% of its surface area in contact with the batting material is transferring approximately 3.1 kJ. The results of the comparison tests were very similar in terms of resulting damage, which indicates that the ignition sources were similar in energy (see Sections 3.5, 3.6, 3.11, and 3.12).

Document ID: Version A

Issued: 10 Dec 2017

Fire research report – Smoke Alarms in Homes: Stage 2

Page 30

Flaming fires were initiated using a butane barbecue lighter. The flame was held to the test material for approximately 15 seconds. The test start time was recorded at the start of ignition.

〔图〕插图

Figure 3 Butane BBQ lighter used in lighting flaming fires, pictured here used in lighting incense

2.4 Smoke alarms

Forty-eight battery-powered, AS 3786-1993-compliant, smoke alarms were installed in 12 locations throughout the unit. These included one photoelectric, one ionisation, one dual (photoelectric and ionisation) and one multi-criteria (photoelectric and heat sensing) alarm at every location. Alarms were installed in three positions: on the ceiling, wall and in dead space positions as defined in the Building Code of Australia Part 3.7.2.2 Requirements for Smoke Alarms (Australian Building Codes Board, 2016) (Figure 4).

A total of 476 smoke alarm samples were modified to supply a voltage output to a data logger on activation. This was achieved either by connecting to the LED indicator, the sounder, or the interconnect circuitry of the alarms (see Figure 5). All samples were verified for Directional Dependence and Initial Sensitivity in accordance with AS 3786 - 2014 (Standards Australia, 2014) at the CSIRO Fire Systems and Acoustics department in Clayton, Victoria prior to testing, with all except one alarm meeting the requirements (See

Fire research report – Smoke Alarms in Homes: Stage 2

Page 31

APPENDIX C CSIRO Smoke Alarm Verification Test Reports). One alarm (P111) was excluded from the sensitivity testing due to sounding errors and was subsequently excluded from the test series.

〔图〕Key1500□Dead air space500mmmm maxminSuitable smokealarm locationCeiling line300 mm300 mmmin500 mm maxExposed floor joist

Figure 4 Diagram defining the dead air space and correct smoke alarm placement according to the Australian Building Codes Board (2016, p. 279)

〔图〕插图

Figure 5 Wiring to the smoke alarm sounder

Document ID: Version A

Issued: 10 Dec 2017

  1. 5 Instrumentation

Internal temperatures were measured via 24 N type thermocouples (measurement range -

270°C to 1260°C), installed at six locations throughout the unit at heights of 0.5 m, 1 m, 1.5 m and 2.3 m from the floor. Ambient test conditions were monitored via a weather station

(Vaisala Weather Transmitter WXT520) positioned outside the unit, measuring air

temperature, air velocity, relative humidity and air pressure. Alarm activations and conditions were captured via a data acquisition system (DataTaker DT80) sampling at 12 channels per second.

Eight infrared digital video cameras were installed throughout the unit to provide video

footage of the tests. In addition, a portable digital camera in a protective casing was used to provide close-up views of the fires.

Two Gasmet DX4000 units were used to monitor and analyse the gas levels within the fire

compartments. A library of 41 gases, including CO, HCN, CO2, O2, HCl, HBr, HF, SO2,

NO2, acrolein and formaldehyde, was included in the analyses which utilises Fourier

Transform Infrared (FTIR) spectroscopy. The full list of gases and tenability limits used in the calculations is listed in APPENDIX B Tenability Criteria. Two high temperature sampling

probes were placed at a height of 1.5 metres at two locations within the unit: one in the

Hallway along the path of egress and the other in one of the two bedrooms (in Bedroom 2

when it was the room of origin and in Bedroom 1 otherwise). Gases were sampled every five seconds.

The residence was thoroughly ventilated and background tested between each test to

enable a clean air environment as the baseline. Smoke alarms were checked following each test for evidence of damage or sounding, and replaced if it was deemed necessary due to

low battery or any visual build-up of residue.

  1. 6 Data Analysis

The data acquired were processed using Microsoft Excel 2010. Tenability limits due to

irritant and asphyxiant gases were calculated using the formulae presented by Engelsman (2015). The effective concentrations for the irritant gases used in the calculations are

detailed in APPENDIX B Tenability Criteria.

All statistical analyses were conducted using IBM SPSS Statistics for Windows, Version 21.0 (Released 2012, IBM Corp., Armonk, NY). The statistical significance level alpha, α was set at 0.05.

  1. 7 Study Limitations

Although this study was limited due to time and cost considerations, care has been taken to design a robust program of tests which were repeatable and representative of typical fires

occurring in residential units in NSW. The configurations of the scenarios were limited due to the construction of the residence, i.e. layout, room sizes, location of openings, ceiling heights and cornice design, surface finishes, furnishings, etc. The smoke alarm positions were

limited to three locations per room, which included the ceiling, wall and dead space and were chosen for practicality. Furnishings were bought from bulk retailers for consistency, price and availability, and were the minimum required to realistically furnish each room for every test. The fires were contained at the conclusion each test to limit the damage to the structure and furnishings.

Weather and ambient conditions were a factor in the testing. The testing was undertaken in North-Western Sydney in late Autumn-early Winter, where temperatures varied throughout the day ranging from 5°C in the early morning to 20°C in the middle of the day.

Obscuration, radiant heat flux, mass loss, and audibility were not measured in this series.

  1. Results

The 81 tests were completed over a six-week period between May and June 2016. These included three tests each of the 27 fire scenarios. The results of each test scenario are

presented below.

  1. 1 SCENARIO 1: Smouldering bedding fire in Bedroom 1, door closed

In this scenario, a smouldering fire was initiated on the bed using the soldering iron heated to 350°C. The element was left in contact with three cotton batting sheets placed on the

polyester quilt for six minutes and then removed. Firefighters then exited the room, closing

the bedroom door behind them.

It was found that in all three tests, the bedding continued to smoulder for over 20 minutes but none of the smoke alarms in the Hallway outside of Bedroom 1 activated during this period. In Test 1, the smoulder continued for 30 minutes before transitioning to a flaming fire once

Fire research report – Smoke Alarms in Homes: Stage 2

Page 34

the foam mattress had burnt through. The alarms positioned outside of Bedroom 1 all activated after the door was opened to extinguish the blaze.

Table 3 below summarises the smoke alarm activation times in the room of origin and hallway by alarm type and position for each test.

〔图〕TES7 NUMBEASA0-OVSA012VSA0\n

Figure 6 Before (left) and after (right) photographs of Scenario 1, Tests 1 (top), 2 (middle) and 3 (bottom).

Table 3 Scenario 1 smoke alarm activation times (min:sec). Empty cells indicate non-activations.

TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling32:4532:3833:0532:32
Hall Wall32:3832:2632:4532:32
Hall Dead-space32:4532:3832:4532:38
ROO Ceiling11:4416:4416:4411:3708:2711:5011:0908:0005:5606:4206:1705:23

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 35

ROO Wall12:2312:4912:0312:1709:0509:5808:3908:5905:5606:0905:3706:09
ROO Dead-space11:0311:5011:3710:5008:5209:4509:1208:0605:0405:5604:5705:10

Figures 5 – 10 show a comparison of smoke alarm activations with the calculated fractional effective concentrations (FEC) for impaired escape and incapacitation, and fractional effective dose (FED) for asphyxiation (death).

The irritant gases contributing to escape impairment and incapacitation in Bedroom 1 included significant amounts of acrolein (up to 29 ppm), formaldehyde (up to 16 ppm), phenol (up to 17 pm), acetaldehyde (up to 66 ppm), and nitrogen dioxide (up to 17 ppm). Note the effective concentrations for escape impairment and incapacitation for these irritants are tabulated in

Fire research report – Smoke Alarms in Homes: Stage 2

Page 36

APPENDIX B Tenability Criteria.

Table 4 Scenario 1 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres

TEST 1TEST 1TEST 2TEST 2TEST 3TEST 3
ROOHallROOHallROOHall
FEC IMPAIRED ESCAPE 0.301:5822:2806:0700:3507:0401:44
FEC IMPAIRED ESCAPE 1.006:4233:1411:3308:4401:44
FEC INCAPACITATION 0.311:0912:5710:49
FEC INCAPACITATION 1.015:52
FED ASPHYXIATION 0.330:53
FED ASPHYXIATION 1.0

〔图〕插图

Figure 7 Scenario 1, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued: 10 Dec 2017

Fire research report – Smoke Alarms in Homes: Stage 2

Page 37

Test 1 activation times by alarm type and location

〔图〕插图

Figure 8 Scenario 1, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 2 activation times by alarm type and location

〔图〕插图

Figure 9 Scenario 1, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 38

〔图〕插图

Figure 10 Scenario 1, Test 2 smoke alarm activation times by type in comparison with calculated hallway FECs for impaired escape and incapacitation, and FED.

〔图〕插图

Figure 11 Scenario 1, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 39

〔图〕插图

Figure 12 Scenario 1, Test 3 smoke alarm activation times by type in comparison with calculated hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

The tenability limit for irritant induced incapacitation (FEC INCAPACITATION 0.3) is reached in Bedroom 1 in all three tests. The data shows that none of the Hallway-mounted smoke alarms gave adequate, if any, notification. In Test 1, the first Bedroom 1 alarm to activate did so at 10 min 50 sec into the test, which provides an available safe egress time (ASET) of only 19 seconds. All room alarms activated within the next six minutes. The gas analysis revealed that in this time, a room occupant would likely have an impaired ability to escape and possibly would have been incapacitated had they inhaled the gases sampled at 1.5 metres. In Test 2, most ROO alarms provided sufficient ASETs (above 135 seconds or 2.25 minutes). In Test 3, the ROO alarms gave ASETs of at least 4 minutes and 7 seconds.

Fire research report – Smoke Alarms in Homes: Stage 2

Page 40

Table 5 Scenario 1 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Bedroom 1 tenability limits. Note: ASET≤0 is no ASET, 0
TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling-21.60-21.49-21.93-21.38#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A
Hall Wall-21.49-21.28-21.60-21.38#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A
Hall Dead-space-21.60-21.49-21.60-21.49#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A
ROO Ceiling-0.58-5.59-5.59-0.474.511.121.794.954.884.124.545.44
ROO Wall-1.24-1.67-0.91-1.133.862.994.293.974.884.665.214.66
ROO Dead-space0.09-0.69-0.470.314.083.203.744.855.764.885.875.65

While care is taken to repeat each scenario using the same materials and ignition source, the atmospheric conditions may affect the results. In this scenario, the drier atmospheric conditions in Test 1 may have attributed to the extended duration of the smoulder and consequently the transition to flame.

Table 6 Scenario 1 atmospheric conditions

Test 1Test 2Test 3
Wind Speed (km/h)0.630.530.51
Air Temp (°C)16.9616.8817.52
Rel. Humidity (%)36.0264.8059.99
Air Pressure (mbar)1019.811021.421018.51

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 41

3.2 SCENARIO 2: Smouldering bedding fire in Bedroom 2, doors open

In this scenario, a smouldering fire was initiated on the bed using the soldering iron heated to 350°C. The element was left in contact with three cotton batting sheets placed on the mattress between the pillow and quilt for six minutes and then removed. Firefighters then exited the room leaving the bedroom door open. The test was ended after 45 minutes at which time the smoulder had self-extinguished.

〔图〕N\n

Figure 13 Before (left) and after (right) photographs of Scenario 2, Tests 1 (top), 2 (middle) and 3 (bottom).

Fire research report – Smoke Alarms in Homes: Stage 2

Page 42

Table 7 Scenario 2 smoke alarm activation times (min:sec)

TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling43:3528:1629:0125:4037:5428:0227:0328:35
Hall Wall26:1529:0826:2227:5524:5230:08
Hall Dead-space30:1535:2726:0929:2926:2431:40
ROO Ceiling13:2014:3707:1707:1010:3409:5508:5609:4822:4112:1311:3312:00
ROO Wall08:4012:2308:3409:0509:4110:3409:4810:1512:3212:3212:3912:32
ROO Dead-space06:5108:2106:3706:2509:0908:5006:1108:5011:0711:0710:5410:40

The irritant gases contributing to escape impairment and incapacitation in Bedroom 2 included acrolein (up to 13.8 ppm), formaldehyde (up to 6.8 ppm), and phenol (up to 4.2 ppm).

Table 8 Scenario 2 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres

TEST 1TEST 1TEST 2TEST 2TEST 3TEST 3
ROOHallROOHallROOHall
FEC IMPAIRED ESCAPE 0.301:3000:0507:2301:5609:5306:46
FEC IMPAIRED ESCAPE 1.010:5711:5610:0211:00
FEC INCAPACITATION 0.312:2929:1311:0011:50
FEC INCAPACITATION 1.0
FED ASPHYXIATION 0.344:2042:4340:04
FED ASPHYXIATION 1.0

Document ID: Version A

Issued: 10 Dec 2017

Fire research report – Smoke Alarms in Homes: Stage 2

Page 43

Test 1 activation times by alarm type and location

〔图〕插图

Figure 14 Scenario 2, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 1 activation times by alarm type and location

〔图〕插图

Figure 15 Scenario 2, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued:

10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 44

Test 2 activation times by alarm type and location

〔图〕插图

Figure 16 Scenario 2, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 2 activation times by alarm type and location

〔图〕插图

Figure 17 Scenario 2, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued:

10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 45

Test 3 activation times by alarm type and location

〔图〕插图

Figure 18 Scenario 2, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 3 activation times by alarm type and location

〔图〕插图

Figure 19 Scenario 2, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued:

10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 46

Table 9 Scenario 2 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Bedroom 2 tenability limits. Note: ASET≤0 is no ASET, 0
TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling-31.10#N/A-15.78#N/A-18.02#N/A-14.67-26.90-16.19#N/A-15.21-16.76
Hall Wall#N/A#N/A-13.77#N/A-18.13#N/A-15.37#N/A-16.08#N/A-13.04-18.30
Hall Dead-space#N/A#N/A-17.77#N/A-24.45#N/A-15.15#N/A-17.65#N/A-14.56-19.84
ROO Ceiling-0.86-2.135.205.320.431.082.061.20-10.85-0.380.28-0.16
ROO Wall3.820.103.923.401.310.431.200.76-0.70-0.70-0.82-0.70
ROO Dead-space5.644.135.866.071.852.174.822.170.720.720.941.16

Table 10 Scenario 2 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0
TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling-14.37#N/A0.95#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A
Hall Wall#N/A#N/A2.96#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A
Hall Dead-space#N/A#N/A-1.04#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A
ROO Ceiling15.8814.6021.9322.05#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A
ROO Wall20.5516.8320.6520.13#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A
ROO Dead-space22.3720.8622.5922.80#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A

Table 11 Scenario 2 atmospheric conditions

Test 1Test 2Test 3
Wind Speed (km/h)0.000.900.61
Air Temp (°C)20.0422.9524.61
Rel. Humidity (%)36.7827.5030.62
Air Pressure (mbar)1012.321009.181013.80

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 47

3.3 SCENARIO 3: Smouldering lounge fire in lounge room, Bedroom 2 door closed

In this scenario, a smouldering fire was initiated on the lounge in the crevice between the armrest and the seat cushion using the soldering iron heated to 350°C. The element was left in contact with three cotton batting sheets for six minutes and then removed. Firefighters then exited the building. The door to Bedroom 2 is closed during the test. The test was ended after 30 minutes at which time the smoulder had self-extinguished.

〔图〕TEUVS\n 〔图〕插图 〔图〕-S0VE\n 〔图〕插图 〔图〕TEST NUSEREE0S\n 〔图〕插图

Figure 20 Before (left) and after (right) photographs of Scenario 3, Tests 1 (top), 2 (middle) and 3 (bottom).

Fire research report – Smoke Alarms in Homes: Stage 2

Page 48

Table 12 Scenario 3 smoke alarm activation times (min:sec)

TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling6.98#N/A7.207.53#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A
Hall Wall8.40-2.157.758.07#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A
Hall Dead-space6.98-2.367.866.65#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A
ROO Ceiling-3.36#N/A-12.617.75#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A
ROO Wall6.19-1.916.868.28#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A
ROO Dead-space-6.78#N/A-2.15-6.24#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A

The irritant gases contributing to escape impairment and incapacitation in the Hallway included acrolein (up to 7.2 ppm), formaldehyde (up to 3 ppm), phenol (up to 4.7 ppm) and nitrogen dioxide (up to 8.5 ppm).

Note that none of the alarms in Bedroom 2 were activated during the three tests.

Table 13 Scenario 3 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres

TEST 1TEST 1TEST 2TEST 2TEST 3TEST 3
Bed1HallBed1HallBed1Hall
FEC IMPAIRED ESCAPE 0.39:070:185:527:319:403:37
FEC IMPAIRED ESCAPE 1.018:345:1813:3931:0117:5211:13
FEC INCAPACITATION 0.314:2414:24
FEC INCAPACITATION 1.0
FED ASPHYXIATION 0.3
FED ASPHYXIATION 1.0

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 49

Test 1 activation times by alarm type and location

〔图〕插图

Figure 21 Scenario 3, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 1 activation times by alarm type and location

〔图〕插图

Figure 22 Scenario 3, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 50

〔图〕插图

Figure 23 Scenario 3, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

〔图〕插图

Figure 24 Scenario 3, Test 2 smoke alarm activation times by type in comparison with calculated hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 51

Test 3 activation times by alarm type and location

〔图〕插图

Figure 25 Scenario 3, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 3 activation times by alarm type and location

〔图〕插图

Figure 26 Scenario 3, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued:

10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 52

Table 14 Scenario 3 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0
TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling6.9814.407.207.53#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A
Hall Wall8.40-2.157.758.07#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A
Hall Dead-space6.98-2.367.866.65#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A
ROO Ceiling-3.3614.40-12.617.75#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A
ROO Wall6.19-1.916.868.28#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A
ROO Dead-space-6.7814.40-2.15-6.24#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A

Table 15 Scenario 3 atmospheric conditions

Test 1Test 2Test 3
Wind Speed (km/h)0.600.590.78
Air Temp (°C)15.2119.8822.48
Rel. Humidity (%)48.8032.0720.33
Air Pressure (mbar)1013.231011.111009.46

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 53

3.4 SCENARIO 5: Flaming bedding fire in Bedroom 2, bedroom doors open

In this scenario, a flaming fire was initiated on the polyester bed quilt using a butane barbeque lighter. The flame is left in contact with the quilt edge for 15 seconds and then removed. The fire was extinguished after 2-3 minutes.

The irritant gases contributing to escape impairment and incapacitation in Bedroom 2 included acrolein (up to 10.5 ppm), formaldehyde (up to 3.5 ppm), nitrogen dioxide (up to 28.5 ppm), phenol (up to 5 ppm) and sulfur dioxide (up to 3.5 ppm). The peak temperature measured in Bedroom 2 was 93.7°C at ceiling height, and 78.4°C at bed height. In this test, a dry sprinkler head was included in Bedroom 2. Video analysis showed that the sprinkler head cover released at a ceiling temperature between 52.2 and 63.4°C.

〔图〕SA0535\n

Figure 27 Before (left) and after (right) photographs of Scenario 5, Tests 1 (top), 2 (middle) and 3 (bottom).

Fire research report – Smoke Alarms in Homes: Stage 2

Page 54

Table 16 Scenario 5 smoke alarm activation times (min:sec)

TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling01:5901:4601:3901:5201:5701:3701:5701:5701:3101:1801:4501:37
Hall Wall01:5901:3301:4601:5201:5101:3701:5701:5701:4501:3101:4501:37
Hall Dead-space01:5201:4601:3901:4601:5702:0501:4401:5101:3101:5801:3101:31
ROO Ceiling01:0600:4600:4601:0001:1700:5001:2401:1001:1100:4400:4400:51
ROO Wall01:1201:0601:3901:1901:2401:1701:1701:3101:1100:5801:4501:11
ROO Dead-space01:1901:0001:3301:0601:3701:0401:1001:2401:0400:5801:0401:04

Table 17 Scenario 5 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres

TEST 1TEST 1TEST 2TEST 2TEST 3TEST 3
ROOHallROOHallROOHall
FEC IMPAIRED ESCAPE 0.301:4300:2501:5503:5501:31
FEC IMPAIRED ESCAPE 1.002:0902:5202:3702:39
FEC INCAPACITATION 0.302:0904:0402:46
FEC INCAPACITATION 1.0
FED ASPHYXIATION 0.3
FED ASPHYXIATION 1.0

The tenability limit for irritant induced incapacitation is reached in Bedroom 2 in Tests 1 and 3 and in the Hallway in Test 1 only. The data shows that the presence of any ROO alarm would alert occupants before the tenability threshold is reached in the Hallway in Test 1, and provide a minimum of 2m25s for safe egress (up to 3m18s). For Hallway alarms, the ASET ranges between 2m5s and 2m31s.

Fire research report – Smoke Alarms in Homes: Stage 2

Page 55

Test 1 activation times by alarm type and location

〔图〕插图

Figure 28 Scenario 5, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 1 activation times by alarm type and location

〔图〕插图

Figure 29 Scenario 5, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued:

10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 56

Test 2 activation times by alarm type and location

〔图〕插图

Figure 30 Scenario 5, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 2 activation times by alarm type and location

〔图〕插图

Figure 31 Scenario 5, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued:

10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 57

Test 3 activation times by alarm type and location

〔图〕插图

Figure 32 Scenario 5, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 3 activation times by alarm type and location

〔图〕插图

Figure 33 Scenario 5, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued:

10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 58

Table 18 Scenario 5 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Bedroom 2 tenability limits. Note: ASET≤0 is no ASET, 0
TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling0.170.390.490.28#/N/A#/N/A#/N/A#/N/A1.271.481.041.16
Hall Wall0.170.600.390.28#/N/A#/N/A#/N/A#/N/A1.041.271.041.16
Hall Dead-space0.280.390.490.39#/N/A#/N/A#/N/A#/N/A1.270.821.271.27
ROO Ceiling1.051.381.381.15#/N/A#/N/A#/N/A#/N/A1.602.052.051.93
ROO Wall0.941.050.490.83#/N/A#/N/A#/N/A#/N/A1.601.821.041.60
ROO Dead-space0.831.150.601.05#/N/A#/N/A#/N/A#/N/A1.721.821.721.72

Table 19 Scenario 5 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0
TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling2.102.322.432.21#/N/A#/N/A#/N/A#/N/A#/N/A#/N/A#/N/A#/N/A
Hall Wall2.102.542.322.21#/N/A#/N/A#/N/A#/N/A#/N/A#/N/A#/N/A#/N/A
Hall Dead-space2.212.322.432.32#/N/A#/N/A#/N/A#/N/A#/N/A#/N/A#/N/A#/N/A
ROO Ceiling2.983.313.313.09#/N/A#/N/A#/N/A#/N/A#/N/A#/N/A#/N/A#/N/A
ROO Wall2.882.982.432.77#/N/A#/N/A#/N/A#/N/A#/N/A#/N/A#/N/A#/N/A
ROO Dead-space2.773.092.542.98#/N/A#/N/A#/N/A#/N/A#/N/A#/N/A#/N/A#/N/A

Table 20 Scenario 5 atmospheric conditions

Test 1Test 2Test 3
Wind Speed (km/h)0.470.881.21
Air Temp (°C)26.2427.3027.13
Rel. Humidity (%)40.6833.9634.54
Air Pressure (mbar)1008.241007.511007.76

Document ID: Version A

Issued:

10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 59

3.5 SCENARIO 7a: Smouldering bedding fire in Bedroom 1, doors open

In this scenario, a smouldering fire was initiated on the bed using the soldering iron heated to 350°C. The element was left in contact with three cotton batting sheets for six minutes and then removed. Firefighters then exited the room leaving the bedroom door open. The test ended after 30 minutes at which time the smoulder had self-extinguished.

〔图〕SLOVSSLOVSVSSA076OVS\n

Figure 34 Before (left) and after (right) photographs of Scenario 7a, Tests 1 (top), 2 (middle) and 3 (bottom).

Fire research report – Smoke Alarms in Homes: Stage 2

Page 60

Table 21 Scenario 7a smoke alarm activation times (min:sec)

TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling29:5910:4410:3715:1219:4629:25
Hall Wall10:0309:4410:0310:0321:54
Hall Dead-space08:5823:4708:5108:5311:1909:5208:2513:5913:4613:40
ROO Ceiling05:4906:1505:5505:3704:3305:4105:2804:2007:1407:3907:3307:00
ROO Wall06:5307:3907:0107:0105:5405:3505:4805:4107:5808:3007:3308:30
ROO Dead-space05:2305:1605:2305:1005:0704:4605:0704:2007:5807:3907:3908:05

The main constituents of the irritant gases detected in Bedroom 1 included acrolein (up to 9.1 ppm), and formaldehyde (up to 3.8 ppm).

Table 22 Scenario 7a Time after ignition (min:sec) at which tenability limits were reached 1.5 metres

TEST 1TEST 1TEST 2TEST 2TEST 3TEST 3
ROOHallROOHallROOHall
FEC IMPAIRED ESCAPE 0.303:2503:2505:5414:1000:5400:54
FEC IMPAIRED ESCAPE 1.004:4904:4908:2409:2309:23
FEC INCAPACITATION 0.305:3905:3909:5509:5509:55
FEC INCAPACITATION 1.0
FED ASPHYXIATION 0.331:1031:1028:3429:3926:2928:00
FED ASPHYXIATION 1.0

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 61

〔图〕插图

Figure 35 Scenario 7a, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

〔图〕插图

Figure 36 Scenario 7a, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 62

〔图〕插图

Figure 37 Scenario 7a, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

〔图〕插图

Figure 38 Scenario 7a, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 63

Test 3 activation times by alarm type and location

〔图〕插图

Figure 39 Scenario 7a, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 3 activation times by alarm type and location

〔图〕插图

Figure 40 Scenario 7a, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued:

10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 64

Table 23 Scenario 7a Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Bedroom 1 tenability limits. Note: ASET≤0 is no ASET, 0
TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling-24.34-5.08-4.96-9.55#N/A#N/A-9.83#N/A#N/A#N/A-19.48#N/A
Hall Wall-4.41-4.09-4.41-4.41#N/A#N/A#N/A#N/A#N/A#N/A-11.97#N/A
Hall Dead-space-3.32#N/A-18.13-3.211.05-1.380.071.52-4.05#N/A-3.84-3.73
ROO Ceiling-0.17-0.61-0.270.045.384.244.465.612.702.282.382.93
ROO Wall-1.24-2.01-1.36-1.364.034.354.144.241.961.432.381.43
ROO Dead-space0.270.380.270.484.815.164.815.611.962.282.281.86

Table 24 Scenario 7a atmospheric conditions

Test 1Test 2Test 3
Wind Speed (km/h)0.410.741.14
Air Temp (°C)17.8619.1817.23
Rel. Humidity (%)48.0740.8942.51
Air Pressure (mbar)999.06998.731000.71

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 65

3.6 SCENARIO 7b: Smouldering bedding fire in Bedroom 1, doors open, cigarette ignition

In this scenario, a smouldering fire was initiated on the bed using a lit cigarette. The cigarette was left in contact with three cotton batting sheets for the duration of the test. The test ended after 30 minutes at which time the smoulder had self-extinguished.

〔图〕250VSLAOS0VS131SLOVc\n

Figure 41 Before (left) and after (right) photographs of Scenario 7b, Tests 1 (top), 2 (middle) and 3 (bottom).

The main irritant gases detected in Bedroom 1 included acrolein (up to 13.4 ppm), formaldehyde (up to 5.6 ppm) and sulfur dioxide (up to 2.3 ppm).

Fire research report – Smoke Alarms in Homes: Stage 2

Page 66

Table 25 Scenario 7b smoke alarm activation times (min:sec)

TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling24:5026:3426:21
Hall Wall
Hall Dead-space15:0014:2714:5311:2715:2212:3211:2113:1714:3013:5113:17
ROO Ceiling10:2210:2210:2911:0309:1611:2110:4109:0311:4412:0510:5012:11
ROO Wall11:0314:0110:1010:5509:5609:5010:0310:0313:0414:2311:5212:56
ROO Dead-space10:4210:2207:3108:1809:2909:2309:5008:2912:0511:5213:0411:17

Table 26 Scenario 7b Time after ignition (min:sec) at which tenability limits were reached 1.5 metres

TEST 1TEST 1TEST 2TEST 2TEST 3TEST 3
ROOHallROOHallROOHall
FEC IMPAIRED ESCAPE 0.304:3004:3003:2503:2500:5400:54
FEC IMPAIRED ESCAPE 1.017:1817:1807:5207:5211:2011:20
FEC INCAPACITATION 0.317:2617:2612:5212:5211:4511:45
FEC INCAPACITATION 1.0
FED ASPHYXIATION 0.327:0527:0528:1828:18
FED ASPHYXIATION 1.0

〔图〕插图

Figure 42 Scenario 7b, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 67

〔图〕插图

Figure 43 Scenario 7b, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

〔图〕插图

Figure 44 Scenario 7b, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 68

〔图〕插图

Figure 45 Scenario 7b, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

〔图〕插图

Figure 46 Scenario 7b, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 69

Test 3 activation times by alarm type and location

〔图〕插图

Figure 47 Scenario 7b, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Table 27 Scenario 7b Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Bedroom 1 tenability limits. Note: ASET≤0 is no ASET, 0
TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling#N/A#N/A-7.39#N/A#N/A#N/A-13.70#N/A#N/A#N/A-14.60#N/A
Hall Wall#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A
Hall Dead-space2.43#N/A2.982.551.41-2.500.331.52-1.53-2.75-2.09-1.53
ROO Ceiling7.067.066.956.393.601.522.183.810.01-0.330.91-0.44
ROO Wall6.393.427.276.512.933.042.822.82-1.31-2.64-0.11-1.19
ROO Dead-space6.737.069.919.133.383.493.044.38-0.33-0.11-1.310.47

Table 28 Scenario 7b atmospheric conditions

Test 1Test 2Test 3
Wind Speed (km/h)0.780.791.01
Air Temp (°C)18.1319.7719.62
Rel. Humidity (%)40.4137.2639.91
Air Pressure (mbar)995.65995.09994.89

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 70

3.7 SCENARIO 10: Flaming fire in Bedroom 1, bedroom doors open

In this scenario, a flaming fire was initiated on the bed quilt using a butane barbeque lighter. The flame is left in contact with the quilt edge for 15 seconds and then removed. The fire was extinguished after two minutes.

〔图〕sSA1010\n

Figure 48 Before (left) and after (right) photographs of Scenario 10, Tests 1 (top), 2 (middle) and 3 (bottom).

The main constituents of the irritant gases detected in Bedroom 1 included acrolein at 2.9 ppm, 4.7 ppm, and 2.9 ppm in Tests 1, 2 and 3 respectively, and formaldehyde at 2.9 ppm, 4.6 ppm and 1.8 ppm.

The peak temperature measured in Bedroom 1 was 100°C at ceiling height (Test 2), and 83.5°C at bed height (Test 3).

Fire research report – Smoke Alarms in Homes: Stage 2

Page 71

Table 29 Scenario 10 smoke alarm activation times (min:sec)

TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling01:3801:1901:3801:3201:2101:0801:0801:1402:1201:2501:1901:32
Hall Wall01:3801:1901:2601:3201:1401:0801:2101:1401:3901:1901:3201:39
Hall Dead-space01:3201:1901:1901:2601:0801:0001:0801:0001:2501:1201:2501:25
ROO Ceiling01:0600:3900:4700:5900:5400:4100:4700:47#N/A00:4500:5200:45
ROO Wall01:1200:5301:5201:0600:5400:4700:5400:5400:5200:5800:5801:12
ROO Dead-space01:1200:5301:2601:0601:0000:4700:5400:5400:5800:3900:4500:52

Table 30 Scenario 10 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres

TEST 1TEST 1TEST 2TEST 2TEST 3TEST 3
ROOHallROOHallROOHall
FEC IMPAIRED ESCAPE 0.300:5402:3500:0102:4001:17
FEC IMPAIRED ESCAPE 1.001:0300:1803:3001:58
FEC INCAPACITATION 0.301:58
FEC INCAPACITATION 1.0
FED ASPHYXIATION 0.3
FED ASPHYXIATION 1.0

〔图〕插图

Figure 49 Scenario 10, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 72

Test 1 activation times by alarm type and location

〔图〕插图

Figure 50 Scenario 10, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 2 activation times by alarm type and location

〔图〕插图

Figure 51 Scenario 10, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued:

10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 73

〔图〕插图

Figure 52 Scenario 10, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

〔图〕插图

Figure 53 Scenario 10, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 74

〔图〕插图

Figure 54 Scenario 10, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Table 31 Scenario 10 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Bedroom 1 tenability limits. Note: ASET≤0 is no ASET, 0
TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling#N/A#N/A#N/A#N/A0.620.840.840.73#N/A#N/A#N/A#N/A
Hall Wall#N/A#N/A#N/A#N/A0.730.840.620.73#N/A#N/A#N/A#N/A
Hall Dead-space#N/A#N/A#N/A#N/A0.840.960.840.96#N/A#N/A#N/A#N/A
ROO Ceiling#N/A#N/A#N/A#N/A1.071.281.181.18#N/A#N/A#N/A#N/A
ROO Wall#N/A#N/A#N/A#N/A1.071.181.071.07#N/A#N/A#N/A#N/A
ROO Dead-space#N/A#N/A#N/A#N/A0.961.181.071.07#N/A#N/A#N/A#N/A

Table 32 Scenario 10 atmospheric conditions

Test 1Test 2Test 3
Wind Speed (km/h)0.580.580.62
Air Temp (°C)17.8817.8818.78
Rel. Humidity (%)63.4063.4049.47
Air Pressure (mbar)1016.831016.831013.19

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 75

3.8 SCENARIO 11: Smouldering electrical fire in kitchen, bedroom doors open

In this scenario, a smouldering fire involving an electrical cable was initiated on a stove element. The cable was placed over the element and the test started when the element was switched on to full heat. The test ended at 10-15 minutes.

〔图〕WNSS[TVTT10WN SS123\n

Figure 55 Before (left) and after (right) photographs of Scenario 11, Tests 1 (top), 2 (middle) and 3 (bottom).

The irritant gases detected in the Hallway included significant amounts of acrolein (up to 4.7 ppm), and sulfur dioxide (up to 2.6 ppm), however the tenability limits for occupant incapacitation were not reached during the three tests.

Fire research report – Smoke Alarms in Homes: Stage 2

Page 76

Table 33 Scenario 11 smoke alarm activation times (min:sec)

TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling04:2905:1604:0203:5603:3304:2002:5203:1903:4804:0002:3503:22
Hall Wall04:0904:3604:1503:5603:0503:4503:1203:0503:3504:4804:2703:48
Hall Dead-space05:1605:0304:0905:0303:5904:0603:1203:5903:4104:0003:2803:54
ROO Ceiling02:1002:3002:1702:1002:3302:2002:5902:2005:4706:3405:3406:08
ROO Wall03:2303:1603:3003:3004:2003:3903:5903:3305:3404:1404:2704:08
ROO Dead-space02:5002:5702:4302:50#N/A03:3303:4503:52#N/A09:1307:3405:01

Table 34 Scenario 11 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres

〔图〕TEST 1TEST 2TEST 3HallHallHallBed1Bed1Bed100:20FEC IMPAIRED ESCAPE 0.302:21FEC IMPAIRED ESCAPE 1.0FEC INCAPACITATION 0.3

Test 1 activation times by alarm type and location

〔图〕插图

Figure 56 Scenario 11, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 77

Test 1 activation times by alarm type and location

〔图〕插图

Figure 57 Scenario 11, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 2 activation times by alarm type and location

〔图〕插图

Figure 58 Scenario 11, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued:

10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 78

〔图〕插图

Figure 59 Scenario 11, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

〔图〕插图

Figure 60 Scenario 11, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 79

Test 3 activation times by alarm type and location

〔图〕插图

Figure 61 Scenario 11, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Table 35 Scenario 11 atmospheric conditions

Test 1Test 2Test 3
Wind Speed (km/h)0.400.420.50
Air Temp (°C)14.7612.0815.17
Rel. Humidity (%)57.2643.4337.31
Air Pressure (mbar)1000.471021.481020.90

Document ID: Version A

Issued: 10 Dec 2017

Fire research report – Smoke Alarms in Homes: Stage 2

Page 80

3.9 SCENARIO 12: Flaming electrical fire in kitchen, bedroom doors open

In this scenario, a flaming fire was initiated in the kitchen involving an electric appliance (a pop-up toaster). The toaster was equipped with a timer cut-out, which prevented the appliance from overheating. In order to initiate a flaming fire, cardboard packing material soaked in 100ml of cooking oil was placed within the toaster as fuel. This caused the appliance to catch in 2m 45s, 2m30s, and 4m35s in Tests 1, 2 and 3, respectively.

〔图〕TIST NMSERSA123TEST NUMBERSA124\n

Figure 62 Before (left) and after (right) photographs of Scenario 12, Tests 1 (top), 2 (middle) and 3 (bottom).

Fire research report – Smoke Alarms in Homes: Stage 2

Page 81

Table 36 Scenario 12 smoke alarm activation times (min:sec)

TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling03:4903:4203:4903:3502:1302:4701:4001:5304:4204:1604:4904:09
Hall Wall03:4203:4903:4203:4201:5302:0701:3401:5304:0904:1604:0204:16
Hall Dead-space03:5504:2104:0203:5502:3403:3302:4702:4005:2906:3705:0906:30
ROO Ceiling03:2103:1403:2803:1403:0003:0001:0702:5303:3703:4403:1703:37
ROO Wall03:2803:2103:4203:2103:2603:1303:2603:0706:0305:4804:4205:48
ROO Dead-space03:2103:1403:2803:2103:1902:5303:1303:0005:5605:3605:4205:48

The irritant gases detected in the Hallway included significant amounts of acrolein (up to 3 ppm) and formaldehyde (up to 0.8 ppm); however the tenability limits for occupant incapacitation were not reached during the three tests.

The peak temperature measured in the kitchen was 48.8°C at ceiling height (Test 2).

Table 37 Scenario 12 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres

TEST 1TEST 1TEST 2TEST 2TEST 3TEST 3
Bed1HallBed1HallBed1Hall
FEC IMPAIRED ESCAPE 0.305:1802:5900:51
FEC IMPAIRED ESCAPE 1.0
FEC INCAPACITATION 0.3
FEC INCAPACITATION 1.0
FED ASPHYXIATION 0.3
FED ASPHYXIATION 1.0

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 82

Test 1 activation times by alarm type and location

〔图〕插图

Figure 63 Scenario 12, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 1 activation times by alarm type and location

〔图〕插图

Figure 64 Scenario 12, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued:

10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 83

Test 2 activation times by alarm type and location

〔图〕插图

Figure 65 Scenario 12, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 2 activation times by alarm type and location

〔图〕插图

Figure 66 Scenario 12, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 84

Test 3 activation times by alarm type and location

〔图〕插图

Figure 67 Scenario 12, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 3 activation times by alarm type and location

〔图〕插图

Figure 68 Scenario 12, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued:

10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 85

Table 38 Scenario 12 atmospheric conditions

Test 1Test 2Test 3
Wind Speed (km/h)0.650.450.67
Air Temp (°C)14.7917.5418.44
Rel. Humidity (%)47.1636.3032.66
Air Pressure (mbar)1013.201011.881010.88

Fire research report – Smoke Alarms in Homes: Stage 2

Page 86

3.10 SCENARIO 13: Flaming lounge fire in lounge room, bedroom doors open

In this scenario, a flaming fire was initiated on a two-seater lounge using a butane barbeque lighter. The flame was held in contact with the edge of the lounge cushion for 15 seconds before being removed. The fire is extinguished after three to four minutes.

〔图〕5A131ZETVSVS\n

Figure 69 Before (left) and after (right) photographs of Scenario 13, Tests 1 (top), 2 (middle) and 3 (bottom).

Fire research report – Smoke Alarms in Homes: Stage 2

Page 87

Table 39 Scenario 13 smoke alarm activation times (min:sec)

TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling02:2901:3501:4802:2202:2602:0002:0002:2602:3201:5201:3802:25
Hall Wall02:3501:3502:0902:2202:2601:3301:3302:2602:1801:4501:5202:25
Hall Dead-space02:4102:0202:2902:3502:4001:5302:1302:3402:3901:5201:5902:39
ROO Ceiling01:5500:4201:0901:5501:4000:2601:0001:5301:4500:3200:3201:52
ROO Wall02:1501:0901:4202:1501:5301:1201:2002:0702:1201:1801:1802:12
ROO Dead-space02:0200:5601:1502:0201:4001:0001:2701:5301:3800:5800:5801:59

The irritant gases detected in the Hallway at 1.5 metres included significant amounts of acrolein (up to 3.6 ppm), formaldehyde (up to 1.8 ppm), nitrogen dioxide (up to 5.7 ppm), nitrogen monoxide (up to 89.4 ppm) and sulfur dioxide (up to 2.8 ppm).

The peak temperature measured in the Lounge room was 112°C at ceiling height (Test 3), and 57.8°C at seat height (Test 1).

Table 40 Scenario 13 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres

TEST 1TEST 1TEST 2TEST 2TEST 3TEST 3
Bed1HallBed1HallBed1Hall
FEC IMPAIRED ESCAPE 0.302:5905:0101:2204:0703:11
FEC IMPAIRED ESCAPE 1.003:4006:08
FEC INCAPACITATION 0.303:48
FEC INCAPACITATION 1.0
FED ASPHYXIATION 0.3
FED ASPHYXIATION 1.0

Fire research report – Smoke Alarms in Homes: Stage 2

Page 88

Test 1 activation times by alarm type and location

〔图〕插图

Figure 70 Scenario 13, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 1 activation times by alarm type and location

〔图〕插图

Figure 71 Scenario 13, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued:

10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 89

Test 2 activation times by alarm type and location

〔图〕插图

Figure 72 Scenario 13, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 2 activation times by alarm type and location

〔图〕插图

Figure 73 Scenario 13, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued:

10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 90

Test 3 activation times by alarm type and location

〔图〕插图

Figure 74 Scenario 13, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 3 activation times by alarm type and location

〔图〕插图

Figure 75 Scenario 13, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued:

10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 91

Table 41 Scenario 13 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0
TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling1.322.212.001.43#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A
Hall Wall1.212.211.661.43#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A
Hall Dead-space1.111.771.321.21#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A
ROO Ceiling1.883.092.651.88#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A
ROO Wall1.552.652.101.55#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A
ROO Dead-space1.772.872.541.77#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A

Table 42 Scenario 13 atmospheric conditions

Test 1Test 2Test 3
Wind Speed (km/h)0.810.460.26
Air Temp (°C)18.0419.3214.53
Rel. Humidity (%)29.0645.6770.24
Air Pressure (mbar)998.981026.231018.09

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 92

3.11 SCENARIO 14a: Smouldering lounge fire in lounge room, bedroom doors open

In this scenario, a smouldering fire was initiated on a two-seater sofa using the soldering iron heated to 350°C. The element was left in contact with three cotton batting sheets for six minutes and then removed. The test ended after 30 minutes at which time the smouldering fires had self-extinguished.

〔图〕3T\n

Figure 76 Before (left) and after (right) photographs of Scenario 14a, Tests 1 (top), 2 (middle) and 3 (bottom).

The irritant gases detected in the Hallway included significant amounts of acrolein (up to 6.3 ppm) and formaldehyde (2.4 ppm).

Fire research report – Smoke Alarms in Homes: Stage 2

Page 93

Table 43 Scenario 14a smoke alarm activation times (min:sec)

TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling07:1307:3905:2705:0009:4817:3909:2709:2109:4611:2610:3208:54
Hall Wall05:2705:5905:4705:4009:3415:5408:5509:0109:0110:1309:2708:41
Hall Dead-space06:0607:5206:1205:5910:4710:5309:2710:2710:1310:0609:3909:53
ROO Ceiling07:2605:2705:3305:2712:0414:5415:1409:0808:2207:4908:0907:36
ROO Wall06:3306:5205:5905:3309:0810:1407:2908:5508:2207:5608:0908:22
ROO Dead-space07:3207:3208:0614:39#N/A15:0711:2610:27#N/A07:4906:5106:57

Table 44 Scenario 14a Time after ignition (min:sec) at which tenability limits were reached 1.5 metres

〔图〕TEST 1TEST 2TEST 3HalHallHallBed1Bed1Bed109:2403:4412:2804:1313:5010:14FECIMPAIRED ESCAPE 0.323:0215:55FEC IMPAIRED ESCA

Test 1 activation times by alarm type and location

〔图〕插图

Figure 77 Scenario 14a, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 94

Test 1 activation times by alarm type and location

〔图〕插图

Figure 78 Scenario 14a, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 2 activation times by alarm type and location

〔图〕插图

Figure 79 Scenario 14a, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued:

10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 95

〔图〕插图

Figure 80 Scenario 14a, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

〔图〕插图

Figure 81 Scenario 14a, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 96

Test 3 activation times by alarm type and location

〔图〕插图

Figure 82 Scenario 14a, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Table 45 Scenario 14a Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0
POSITIONPOSITIONPOSITIONPOSITIONPOSITIONTEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling#N/A#N/A#N/A#N/A16.068.1916.4016.51#N/A#N/A#N/A#N/A
Hall Wall#N/A#N/A#N/A#N/A16.299.9416.9416.83#N/A#N/A#N/A#N/A
Hall Dead-space#N/A#N/A#N/A#N/A15.0714.9616.4015.40#N/A#N/A#N/A#N/A
ROO Ceiling#N/A#N/A#N/A#N/A13.7810.9510.6216.72#N/A#N/A#N/A#N/A
ROO Wall#N/A#N/A#N/A#N/A16.7215.6218.3616.94#N/A#N/A#N/A#N/A
ROO Dead-space#N/A#N/A#N/A#N/A#N/A10.7314.4215.40#N/A#N/A#N/A#N/A

Table 46 Scenario 14a atmospheric conditions

Test 1Test 2Test 3
Wind Speed (km/h)0.630.680.27
Air Temp (°C)17.8415.9114.86
Rel. Humidity (%)56.5372.4073.21
Air Pressure (mbar)1022.531022.351020.83

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 97

3.12 SCENARIO 14b: Smouldering lounge fire in lounge room, bedroom doors open

In this scenario, a smouldering fire was initiated on a two-seater sofa using a lit cigarette. The cigarette was left in contact with three cotton batting sheets for the duration of the test. The test ended after 30 minutes at which time the smouldering fires had self-extinguished.

〔图〕44TEST NUMBER1AS\n 〔图〕TEST NUMBER441AS\n 〔图〕-SA1STEST NUMSLRSA146\n 〔图〕TEST NUMBERSA145TEST NUMSERSA146\n

Figure 83 Before (left) and after (right) photographs of Scenario 14b, Tests 1 (top), 2 (middle) and 3 (bottom).

Fire research report – Smoke Alarms in Homes: Stage 2

Page 98

Table 47 Scenario 14b smoke alarm activation times (min:sec)

TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling09:4411:0410:3009:3020:4622:1119:0920:0110:0210:2210:3509:49
Hall Wall09:4410:0309:5709:3020:1421:2420:3920:0709:5610:4109:0509:43
Hall Dead-space10:1711:0410:5010:1720:3922:1117:0120:3910:3510:5411:3310:28
ROO Ceiling09:5709:3709:3709:5722:1720:0719:4820:3309:4309:3609:36
ROO Wall09:4409:5709:3709:3721:5821:3121:3121:2409:2409:3610:0809:43
ROO Dead-space13:4211:1011:2316:5122:3221:1819:4822:1708:5111:2609:0508:38

The irritant gases detected in the Hallway included significant amounts of acrolein (up to 11.2 ppm) and formaldehyde (up to 2.2 ppm).

Table 48 Scenario 14b Time after ignition (min:sec) at which tenability limits were reached 1.5 metres

TEST 1TEST 1TEST 2TEST 2TEST 3TEST 3
Bed1HallBed1HallBed1Hall
FEC IMPAIRED ESCAPE 0.301:5822:2806:0700:3507:0401:44
FEC IMPAIRED ESCAPE 1.006:4033:1411:3308:4401:44
FEC INCAPACITATION 0.311:0912:5710:49
FEC INCAPACITATION 1.015:52
FED ASPHYXIATION 0.330:53
FED ASPHYXIATION 1.0

Fire research report – Smoke Alarms in Homes: Stage 2

Page 99

Test 1 activation times by alarm type and location

〔图〕插图

Figure 84 Scenario 14b, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 1 activation times by alarm type and location

〔图〕插图

Figure 85 Scenario 14b, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued:

10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 100

Test 2 activation times by alarm type and location

〔图〕插图

Figure 86 Scenario 14b, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 2 activation times by alarm type and location

〔图〕插图

Figure 87 Scenario 14b, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued:

10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 101

Test 3 activation times by alarm type and location

〔图〕插图

Figure 88 Scenario 14b, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 3 activation times by alarm type and location

〔图〕插图

Figure 89 Scenario 14b, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued:

10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 102

Table 49 Scenario 14b Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0
TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling#N/A#N/A#N/A#N/A-14.63-16.05-13.02-13.883.523.192.973.73
Hall Wall#N/A#N/A#N/A#N/A-14.09-15.27-14.52-13.983.622.874.473.84
Hall Dead-space#N/A#N/A#N/A#N/A-14.52-16.05-10.88-14.522.972.652.003.08
ROO Ceiling#N/A#N/A#N/A#N/A-16.16-13.98-13.66-14.413.84#N/A3.953.95
ROO Wall#N/A#N/A#N/A#N/A-15.83-15.39-15.39-15.274.163.953.413.84
ROO Dead-space#N/A#N/A#N/A#N/A-16.39-15.16-13.66-16.164.712.114.474.92

Table 50 Scenario 14b atmospheric conditions

Test 1Test 2Test 3
Wind Speed (km/h)0.630.530.51
Air Temp (°C)16.9616.8817.52
Rel. Humidity (%)36.0264.8059.99
Air Pressure (mbar)1019.811021.421018.51

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 103

3.13 SCENARIO 15: Flaming paper fire in lounge room, bedroom doors open

In this scenario, a flaming fire was initiated in a waste bin containing 50 sheets of copy paper using the butane barbeque lighter. The flame was left in contact with the paper for 15 seconds and then removed.

〔图〕√Sb\n 〔图〕VSSTEST NUSA155TEST NUMBERSA156\n

Figure 90 Before (left) and after (right) photographs of Scenario 15, Tests 1 (top), 2 (middle) and 3 (bottom).

Fire research report – Smoke Alarms in Homes: Stage 2

Page 104

Table 51 Scenario 15 smoke alarm activation times (min:sec)

TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling06:1603:2603:0706:0305:4604:3404:1305:4603:2000:5601:2303:12
Hall Wall06:0303:0702:5405:5705:5204:1303:3406:5203:2000:5601:2303:12
Hall Dead-space06:2303:0702:5406:2906:4604:2703:3406:3303:3901:0301:0903:33
ROO Ceiling02:3501:0203:0002:3503:1501:1002:2802:5402:3100:2300:2302:19
ROO Wall05:2402:0103:0005:3105:5202:4003:2106:1302:4400:3600:5602:44
ROO Dead-space01:0201:2202:3501:1601:1605:0000:2300:2302:04

The irritant gases detected in the Hallway included significant amounts of acrolein (up to 9.60 ppm), formaldehyde (up to 3.2 ppm) and sulfur dioxide (up to 5.1 ppm).

The peak temperature measured at the ceiling in the Lounge room was 26.8°C.

Table 52 Scenario 15 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres

TEST 1TEST 1TEST 2TEST 2TEST 3TEST 3
Bed1HallBed1HallBed1Hall
FEC IMPAIRED ESCAPE 0.304:0301:2900:4700:0004:3100:27
FEC IMPAIRED ESCAPE 1.005:0105:0108:2604:2403:3503:35
FEC INCAPACITATION 0.306:0706:0707:3207:3205:3705:37
FEC INCAPACITATION 1.0
FED ASPHYXIATION 0.3
FED ASPHYXIATION 1.0

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 105

Test 1 activation times by alarm type and location

〔图〕插图

Figure 91 Scenario 15, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 2 activation times by alarm type and location

〔图〕插图

Figure 92 Scenario 15, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued:

10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 106

〔图〕插图

Figure 93 Scenario 15, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

〔图〕插图

Figure 94 Scenario 15, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 107

Test 3 activation times by alarm type and location

〔图〕插图

Figure 95 Scenario 15, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 3 activation times by alarm type and location

〔图〕插图

Figure 96 Scenario 15, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued:

10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 108

Table 53 Scenario 15 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0
TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling-0.162.683.000.061.772.963.311.772.294.684.232.41
Hall Wall0.063.003.220.171.663.313.970.662.294.684.232.41
Hall Dead-space-0.273.003.22-0.370.773.083.970.981.964.574.462.07
ROO Ceiling3.545.083.123.544.296.375.074.643.095.245.243.31
ROO Wall0.714.103.120.611.664.864.181.322.885.024.682.88
ROO Dead-space#N/A5.084.753.54#N/A6.276.272.53#N/A5.245.243.55

Table 54 Scenario 15 atmospheric conditions

Test 1Test 2Test 3
Wind Speed (km/h)0.360.180.27
Air Temp (°C)14.8212.5113.86
Rel. Humidity (%)79.0484.1877.91
Air Pressure (mbar)1024.351022.201022.01

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 109

3.14 SCENARIO 16: Flaming chair fire in lounge, bedroom doors open

In this scenario, a flaming fire was initiated on the seat pad of a timber dining chair using a butane barbeque lighter. The flame was held to the seat edge for 15 seconds and then removed. The flaming fire spread across the chair pad until the cushion is consumed and did not spread to the MDF backing or rubber wood frame. The fire self-extinguished in approximately 12 minutes.

〔图〕9S9S备\n

Figure 97 Before (left) and after (right) photographs of Scenario 16, Tests 1 (top), 2 (middle) and 3 (bottom).

Fire research report – Smoke Alarms in Homes: Stage 2

Page 110

Table 55 Scenario 16 smoke alarm activation times (min:sec)

TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling05:5304:4707:1505:1105:3004:32
Hall Wall05:0004:2806:2905:1705:2403:39
Hall Dead-space05:2004:0206:1505:3005:0403:59
ROO Ceiling03:0303:5609:0504:2504:3203:0602:1402:34
ROO Wall03:0303:1704:5105:1702:4103:20
ROO Dead-space02:1602:2301:1201:1802:0002:14

The irritant gases detected in the Hallway included significant amounts of acrolein (up to 1.8 ppm), formaldehyde (up to 0.7 ppm) and sulfur dioxide (up to 5.1 ppm).

The peak temperature measured at the ceiling in the Lounge room was 26.3°C.

The tenability limits for occupant incapacitation were not reached in these tests.

Table 56 Scenario 16 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres

TEST 1TEST 1TEST 2TEST 2TEST 3TEST 3
Bed1HallBed1HallBed1Hall
FEC IMPAIRED ESCAPE 0.304:5700:08
FEC IMPAIRED ESCAPE 1.0
FEC INCAPACITATION 0.3
FEC INCAPACITATION 1.0
FED ASPHYXIATION 0.3
FED ASPHYXIATION 1.0

Fire research report – Smoke Alarms in Homes: Stage 2

Page 111

〔图〕插图

Figure 98 Scenario 16, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

〔图〕插图

Figure 99 Scenario 16, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 112

〔图〕插图

Figure 100 Scenario 16, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

〔图〕插图

Figure 101 Scenario 16, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 113

Test 3 activation times by alarm type and location

〔图〕插图

Figure 102 Scenario 16, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 3 activation times by alarm type and location

〔图〕插图

Figure 103 Scenario 16, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 114

Table 57 Scenario 16 atmospheric conditions

Test 1Test 2Test 3
Wind Speed (km/h)0.750.780.53
Air Temp (°C)16.7018.0415.29
Rel. Humidity (%)51.1352.0375.26
Air Pressure (mbar)1024.401023.331023.79

Fire research report – Smoke Alarms in Homes: Stage 2

Page 115

3.15 SCENARIO 17: Flaming cooking oil fire in kitchen, bedroom doors open

In this scenario 250 ml of cooking oil (canola) is heated to flashpoint (+380°C) in a 24 cm frying pan on the stove. Flaming ignition of the cooking oil was achieved at different times for each test using a butane barbeque lighter: Test 1 at 14 minutes when the oil surface temperature was 400°C, Test 2 at 11m20s at 390°C, and Test 3 at 10m40s at 434°C.

〔图〕M0W0N1-工\n 〔图〕插图 〔图〕A\n 〔图〕插图 〔图〕IV\n 〔图〕插图

Figure 104 Before (left) and during (right) photographs of Scenario 17, Tests 1 (top), 2 (middle) and 3 (bottom).

The majority of smoke alarms activated before the flames ignited (Table 58).

Fire research report – Smoke Alarms in Homes: Stage 2

Page 116

Table 58 Scenario 17 smoke alarm activation times (min:sec) in the Hallway and Lounge room

TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling11:0608:2006:4911:0607:1307:0006:3307:0008:5909:3610:1408:32
Hall Wall10:5308:0706:0911:0006:4606:3306:4006:4007:5409:3008:20
Hall Dead-space11:4008:4605:5611:4708:2008:0607:4008:1310:0107:4809:24
ROO Ceiling09:4005:5004:3009:4005:4006:0705:4005:3405:0105:5904:4105:40
ROO Wall10:4705:0305:0310:4007:2007:2706:3306:4607:2207:2206:4407:22
ROO Dead-space14:5110:4010:0812:1510:0605:0005:4008:0009:1210:5811:1109:05

The irritant gases detected in the Hallway included significant amounts of acrolein (up to 5.5 ppm), formaldehyde (up to 0.94 ppm), and sulfur dioxide (up to 4.9 ppm).

The peak temperature measured in the kitchen was 79°C and in the Lounge room was 66.6°C, both at ceiling height in Test 1.

Table 59 Scenario 17 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres

TEST 1TEST 1TEST 2TEST 2TEST 3TEST 3
Bed1HallBed1HallBed1Hall
FEC IMPAIRED ESCAPE 0.312:3601:4005:3200:3006:4510:13
FEC IMPAIRED ESCAPE 1.016:2316:2313:2513:25
FEC INCAPACITATION 0.313:2513:25
FEC INCAPACITATION 1.0
FED ASPHYXIATION 0.3
FED ASPHYXIATION 1.0

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 117

Test 1 activation times by alarm type and location.

〔图〕插图

Figure 105 Scenario 17, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 1 activation times by alarm type and location

〔图〕插图

Figure 106 Scenario 17, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 118

Test 2 activation times by alarm type and location

〔图〕插图

Figure 107 Scenario 17, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 2 activation times by alarm type and location

〔图〕插图

Figure 108 Scenario 317, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued:

10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 119

Test 3 activation times by alarm type and location

〔图〕插图

Figure 109 Scenario 17, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Test 3 activation times by alarm type and location

〔图〕插图

Figure 110 Scenario 17, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 120

Table 60 Scenario 17 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0
TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling#N/A#N/A#N/A#N/A6.206.426.876.42#N/A#N/A#N/A#N/A
Hall Wall#N/A#N/A#N/A#N/A6.656.876.766.76#N/A#N/A#N/A#N/A
Hall Dead-space#N/A#N/A#N/A#N/A5.095.315.755.20#N/A#N/A#N/A#N/A
ROO Ceiling#N/A#N/A#N/A#N/A7.757.307.757.86#N/A#N/A#N/A#N/A
ROO Wall#N/A#N/A#N/A#N/A6.095.966.876.65#N/A#N/A#N/A#N/A
ROO Dead-space#N/A#N/A#N/A#N/A3.328.427.755.42#N/A#N/A#N/A#N/A

Table 61 Scenario 17 atmospheric conditions

Test 1Test 2Test 3
Wind Speed (km/h)0.510.460.89
Air Temp (°C)20.8820.5816.36
Rel. Humidity (%)27.8043.2242.36
Air Pressure (mbar)1009.271012.551002.51

Fire research report – Smoke Alarms in Homes: Stage 2

Page 121

3.16 SCENARIO 18: Flaming tea towel fire in kitchen, bedroom doors open

In this scenario, a flaming fire was initiated in a cotton tea towel on the kitchen stove using a butane barbeque lighter. The flame was held in contact with the tea towel for 15s and then removed. The tests ended after six to seven minutes.

〔图〕60:S:T 9T02/S0/ISH*8VS\n

Figure 111 Images of Scenario 18, Tests 1 (top), 2 (middle) and 3 (bottom).

Fire research report – Smoke Alarms in Homes: Stage 2

Page 122

Table 62 Scenario 18 smoke alarm activation times (min:sec) in the Hallway and Lounge room

TEST 1TEST 1TEST 1TEST 1TEST 2TEST 2TEST 2TEST 2TEST 3TEST 3TEST 3TEST 3
POSITIONPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMultiPhoto-electricIonisationDualMulti
Hall Ceiling01:3701:5702:3801:4401:5802:1206:5802:0502:3205:57
Hall Wall06:5502:3902:4502:1901:5101:5802:1905:4402:1202:1205:57
Hall Dead-space01:3701:3702:5201:5102:1903:0006:5102:1902:2607:11
ROO Ceiling00:2200:2200:1600:2200:5700:5000:5000:5701:3201:3801:38
ROO Wall00:4301:1701:4401:1701:1001:4406:5801:3801:5906:37
ROO Dead-space00:4300:4301:3102:4501:3101:5201:52

The irritant gases detected in the Hallway included significant amounts of acrolein (up to 2.9 ppm), and formaldehyde (up to 1.3 ppm).

The peak temperature measured in the kitchen was 34.7°C and in the Lounge room was 34.4°C, both at ceiling height in Test 3.

The tenability limits for occupant incapacitation in the Hallway at 1.5 metres were not reached in the tests.

Table 63 Scenario 18 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres

〔图〕TEST 1TEST 2TEST 3HallHalHalBed1Bed1Bed1FEC IMPAIRED ESCAPE 0.306:3505:5704:4502:00FEC IMPAIRED ESCAPE 1.0FEC INCAPACITA Fire research report – Smoke Alarms in Homes: Stage 2

Page 123

〔图〕插图

Figure 112 Scenario 18, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

〔图〕插图

Figure 113 Scenario 18, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Fire research report – Smoke Alarms in Homes: Stage 2

Page 124

〔图〕插图

Figure 114 Scenario 18, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

〔图〕插图

Figure 115 Scenario 18, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Document ID: Version A

Issued: 10 Dec 2017

Copyright NSW State Government (FRNSW)

Figure 116 Scenario 18, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 117 Scenario 18, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Table 64 Scenario 18 atmospheric conditions

Test 1

Test 2

Test 3

Wind Speed (km/h)

  1. 07
  1. 00
  1. 04

Air Temp (°C)

  1. 60
  1. 69
  1. 50

Rel. Humidity (%)

  1. 12
  1. 66
  1. 35

Air Pressure (mbar)

  1. 69 1007.56
  1. 22
  1. 17 SCENARIO 19: Smouldering iron in the laundry, bedroom doors open

In this scenario, a smouldering fire was initiated in the laundry/bathroom using a clothes iron which had been modified to bypass the in-built thermal cut-off. The appliance was switched on high heat and left to heat up on its own. In these three tests, the iron heats for a couple of minutes before self-igniting at 3m30s, 2m35s, and 3m15s in Test 1, 2 and 3, respectively.

Figure 118 Before (left) and after (right) photographs of Scenario 19, Tests 1 (top), 2 (middle) and 3 (bottom).

Table 65 Scenario 19 smoke alarm activation times (min:sec) in the Hallway and Lounge room.

TEST 1

TEST 2

TEST 3

POSITION Photo-electric Ionisation Dual

Multi Photo-electric Ionisation Dual

Multi Photo-electric Ionisation Dual

Multi

Hall Ceiling #N/A 03:54 03:08 03:22 #N/A 02:35 02:35 02:35 #N/A 02:40 02:20 02:54

Hall Wall 04:01 02:56 03:08 03:35 03:08 02:35 03:02 03:21 03:32 02:40 02:47 03:19 Hall Deadspace 04:07 03:48 04:20 04:26 03:53 03:34 03:15 04:07 03:51 03:06 03:19 03:51

Lounge

Ceiling 07:52 04:26 04:20 08:05 04:39 03:47 04:13 05:00 04:37 04:24 05:16 04:57 Lounge Wall 06:35 04:07 04:20 05:17

04:25 04:19 06:30 07:01 04:44 05:29 06:15

Lounge

Dead-space

05:26

09:44 05:26 05:49 05:29 05:36 05:29

The irritant gases detected in the Hallway included significant amounts of acrolein (up to 2.3 ppm), formaldehyde (up to 0.73 ppm) and sulfur dioxide (up to 3.7 ppm).

The tenability limits for occupant incapacitation were not reached in the tests.

Table 66 Scenario 19 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres

TEST 1

TEST 2

TEST 3

Bed1 Hall Bed1 Hall Bed1 Hall

FEC IMPAIRED ESCAPE 0.3

01:35 03:59

06:55 00:41

FEC IMPAIRED ESCAPE 1.0 FEC INCAPACITATION 0.3 FEC INCAPACITATION 1.0 FED ASPHYXIATION 0.3 FED ASPHYXIATION 1.0

Figure 119 Scenario 19, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 120 Scenario 19, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 121 Scenario 19, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 122 Scenario 317, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 123 Scenario 19, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 124 Scenario 19, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Table 67 Scenario 19 atmospheric conditions

Test 1

Test 2

Test 3

Wind Speed (km/h)

  1. 70
  1. 67
  1. 65

Air Temp (°C)

  1. 35
  1. 61
  1. 27

Rel. Humidity (%)

  1. 83
  1. 93
  1. 76

Air Pressure (mbar)

  1. 30
  1. 21
  1. 02
  1. 18 SCENARIO 20: Smouldering iron in the laundry, laundry door closed

In this scenario, similarly to Scenario 19, a smouldering fire was initiated in the

laundry/bathroom using a clothes iron which had been modified to bypass the in-built

thermal cut-off. The appliance was switched on high heat and left to heat up on its own and the sliding door to the laundry was shut. In these three tests, the iron heats for a couple of minutes before self-igniting.

Figure 125 Before (left) and after (right) photographs of Scenario 3, Tests 1 (top), 2 (middle) and 3 (bottom).

Table 68 Scenario 20 smoke alarm activation times (min:sec) in the Hallway and Lounge room.

TEST 1

TEST 2

TEST 3

POSITION Photo-electric Ionisation Dual

Multi Photo-electric Ionisation Dual

Multi Photo-electric Ionisation Dual

Multi

Hall Ceiling 05:54 04:30 04:42 04:36 #N/A #N/A #N/A 16:11 06:10 05:57 06:03 05:57

Hall Wall 05:02 04:42 04:42 04:56 07:38 #N/A 08:17 06:40 06:49 06:49 #N/A 05:50 Hall Deadspace 06:07 06:33 06:19 06:00 #N/A #N/A #N/A #N/A #N/A #N/A 08:04 08:43

Lounge

Ceiling #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 09:54 09:54 09:54 Lounge Wall 06:45 #N/A 06:59 06:33 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

Lounge

Dead-space 07:12 #N/A 07:12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

The irritant gases detected in the Hallway included significant amounts of acrolein (up to 1.1 ppm). The tenability limits for occupant incapacitation were not reached in the tests.

Table 69 Scenario 20 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres

TEST 1

TEST 2

TEST 3

Bed1 Hall Bed1 Hall Bed1 Hall

FEC IMPAIRED ESCAPE 0.3

00:14 02:19 05:32

05:33

FEC IMPAIRED ESCAPE 1.0 FEC INCAPACITATION 0.3 FEC INCAPACITATION 1.0 FED ASPHYXIATION 0.3 FED ASPHYXIATION 1.0

Figure 126 Scenario 20, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 127 Scenario 20, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 128 Scenario 20, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 129 Scenario 317, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 130 Scenario 20, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 131 Scenario 20, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Table 70 Scenario 20 atmospheric conditions

Test 1

Test 2

Test 3

Wind Speed (km/h)

  1. 84
  1. 91
  1. 64

Air Temp (°C)

  1. 98
  1. 19
  1. 39

Rel. Humidity (%)

  1. 08
  1. 10
  1. 38

Air Pressure (mbar)

  1. 65
  1. 27
  1. 08
  1. 19 SCENARIO 22: Flaming bedding in Bedroom 1, Bedroom 1 door closed

In this scenario, a flaming fire was initiated on a pillow in Bedroom 1 using a butane

barbeque lighter. The door to Bedroom 1 was closed throughout the test. The flame was held to the pillow edge for 15 seconds and then removed.

Figure 132 Images of Scenario 22, Tests 1 (top), 2 (middle) and 3 (bottom).

Table 71 Scenario 22 smoke alarm activation times (min:sec)

TEST 1

TEST 2

TEST 3

POSITION Photo-electric Ionisation Dual

Multi Photo-electric Ionisation Dual

Multi Photo-electric Ionisation Dual

Multi

Hall Ceiling 02:36 02:17

02:29 02:36

02:33 02:13

02:07 02:19

02:32 02:13

02:19 02:19

Hall Wall 02:29 02:23

02:29 02:29

02:19 02:07

02:13 02:26

02:39 02:19

02:32 02:39

Hall Deadspace 02:29 02:10

02:29 02:23

02:19 01:54

02:58 02:07

02:25 02:06

02:39 02:13

ROO Ceiling 01:38 01:25

01:45 01:32

01:03 00:44

01:16 00:56

01:14 00:30

00:36 01:08

ROO Wall 01:38 01:13

01:38 01:38

01:09 00:56

01:22 01:22

01:21 00:49

00:49 01:21

ROO Deadspace 01:38 01:00

00:53 01:38

01:09 00:56

01:03 01:03

00:36

01:02 01:14

The irritant gases detected in the Hallway included significant amounts of acrolein (up to

  1. 5 ppm), formaldehyde (up to 4.2 ppm), nitrogen dioxide (up to 20 ppm), phenol (up to
  1. 2 ppm) and sulfur dioxide (up to 5.5 ppm). The tenability limits for occupant incapacitation were reached only in Bedroom 1. The peak temperature measured in Bedroom 1 reached

138°C at the ceiling (Test 2).

Table 72 Scenario 22 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres

TEST 1

TEST 2

TEST 3

Bed1 Hall Bed1 Hall Bed1 Hall FEC IMPAIRED ESCAPE 0.3 01:32 03:43 00:09 01:13 01:23 06:56 FEC IMPAIRED ESCAPE 1.0 02:13

01:07

01:40

FEC INCAPACITATION 0.3 02:13

01:41

01:40

FEC INCAPACITATION 1.0 FED ASPHYXIATION 0.3 FED ASPHYXIATION 1.0

Figure 133 Scenario 22, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 134 Scenario 22, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 135 Scenario 22, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 136 Scenario 22, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 137 Scenario 22, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 138 Scenario 22, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Table 73 Scenario 22 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0

TEST 1

TEST 2

TEST 3

POSITION Photo-electric Ionisation Dual

Multi Photo-electric Ionisation Dual

Multi Photo-electric Ionisation Dual

Multi

Hall Ceiling -0.38 -0.07 -0.27 -0.38 -0.86 -0.53 -0.43 -0.64 -0.86 -0.55 -0.65 -0.65

Hall Wall -0.27 -0.17 -0.27 -0.27 -0.64 -0.43 -0.53 -0.74 -0.98 -0.65 -0.86 -0.98 Hall Deadspace -0.27 0.05 -0.27 -0.17 -0.64 -0.21 -1.28 -0.43 -0.76 -0.43 -0.98 -0.55 ROO Ceiling 0.59 0.79 0.47 0.69 0.63 0.95 0.42 0.75 0.43 1.17 1.07 0.54

ROO Wall 0.59 1.00 0.59 0.59 0.53 0.75 0.32 0.32 0.32 0.85 0.85 0.32 ROO Deadspace 0.59 1.22 1.33 0.59 0.53 0.75 0.63 0.63 #N/A 1.07 0.64 0.43

Table 74 Scenario 22 atmospheric conditions

Test 1

Test 2

Test 3

Wind Speed (km/h)

  1. 73
  1. 99
  1. 71

Air Temp (°C)

  1. 50
  1. 87
  1. 20

Rel. Humidity (%)

  1. 29
  1. 58
  1. 24

Air Pressure (mbar)

  1. 71 1000.71
  1. 19
  1. 20 SCENARIO 23: Flaming paper fire in Bedroom 2, bedroom doors open

In this scenario, a flaming fire was initiated in a waste bin containing 20 sheets of scrunched copy paper using the butane barbeque lighter. The flame is left in contact with the paper for 15 seconds and then removed. The fires continued to burn for two to three minutes and selfextinguished after all the paper had burned.

Figure 139 Images of Scenario 23, Tests 1 (top), 2 (middle) and 3 (bottom).

Table 75 Scenario 23 smoke alarm activation times (min:sec)

TEST 1

TEST 2

TEST 3

POSITION Photo-electric Ionisation Dual

Multi Photo-electric Ionisation Dual

Multi Photo-electric Ionisation Dual

Multi

Hall Ceiling #N/A 00:48 01:14 #N/A #N/A 01:08 01:15 #N/A #N/A 01:23 01:16 #N/A

Hall Wall #N/A 00:41 01:07 #N/A #N/A 01:08 01:15 #N/A #N/A 01:08 01:16 #N/A Hall Deadspace #N/A 00:41 00:48 #N/A #N/A 01:02 01:15 #N/A #N/A 01:08 01:29 #N/A ROO Ceiling #N/A 00:08 00:28 #N/A #N/A 00:35 00:42 #N/A #N/A 00:35 00:42 #N/A

ROO Wall #N/A 00:14 00:41 #N/A #N/A 00:42 00:49 #N/A #N/A 00:35 00:42 #N/A ROO Deadspace #N/A 00:08 00:21 #N/A #N/A 00:42 00:55 00:55 #N/A 00:28 00:42 #N/A

The irritant gases detected in the Hallway included significant amounts of acrolein (up to 2.7 ppm) and formaldehyde (1.4 ppm). The tenability limits for occupant incapacitation were not reached in the tests. The temperatures measured in the Hallway peaked at 32.7°C at the

ceiling (Test 3), from 19°C at the start of the test.

Table 76 Scenario 23 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres

TEST 1

TEST 2

TEST 3

ROO Hall ROO Hall ROO Hall FEC IMPAIRED ESCAPE 0.3 00:10

00:26

00:31 03:35

FEC IMPAIRED ESCAPE 1.0 FEC INCAPACITATION 0.3 FEC INCAPACITATION 1.0 FED ASPHYXIATION 0.3 FED ASPHYXIATION 1.0

Figure 140 Scenario 23, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 141 Scenario 23, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 142 Scenario 23, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 143 Scenario 23, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 144 Scenario 23, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 145 Scenario 23, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Table 77 Scenario 23 atmospheric conditions

Test 1

Test 2

Test 3

Wind Speed (km/h)

  1. 47
  1. 59
  1. 00

Air Temp (°C)

  1. 93
  1. 17
  1. 16

Rel. Humidity (%)

  1. 17
  1. 73
  1. 86

Air Pressure (mbar)

  1. 23 1009.59
  1. 98
  1. 21 SCENARIO 24: Flaming paper fire in Bedroom 2, Bedroom 1 closed

In this scenario, similarly to Scenario 23, a flaming fire was initiated in a waste bin containing 20 sheets of scrunched copy paper using the butane barbeque lighter. The flame was left in contact with the paper for 15 seconds and then removed. The fires continued to burn for two to three minutes and self-extinguished after all the paper had burned. The door to Bedroom 1 was closed throughout the test.

Figure 146 Images of Scenario 24, Tests 1 (top), 2 (middle) and 3 (bottom).

Table 78 Scenario 24 smoke alarm activation times (min:sec) in the Hallway and Bedroom 2

TEST 1

TEST 2

TEST 3

POSITION Photo-electric Ionisation Dual

Multi Photo-electric Ionisation Dual

Multi Photo-electric Ionisation Dual

Multi

Hall Ceiling

01:13

01:20

00:46

01:06

00:47

00:41

Hall Wall

01:07

01:07

00:46

00:46

00:54

00:41

Hall Deadspace

01:07

01:13

00:46

01:06

00:35

00:41 01:00

ROO Ceiling

00:40

01:07

00:19

00:19

00:15

00:28 00:35

ROO Wall

00:40

00:47

00:19

00:38

00:28

00:28 00:47

ROO Deadspace

00:40

00:47

00:13

00:25 00:38

00:47 00:15

00:21 00:28

The irritant gases detected in Bedroom 2 included significant amounts of acrolein (up to 2.4 ppm), formaldehyde (3 ppm) and sulfur dioxide (up to 7.2 ppm). The tenability limits for

occupant incapacitation were not reached in the tests. The temperatures measured in

Bedroom 2 peaked at 27.9°C, rising from an initial 20°C (Test 2).

Table 79 Scenario 24 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres

TEST 1

TEST 2

TEST 3

ROO Hall ROO Hall ROO Hall FEC IMPAIRED ESCAPE 0.3 00:39

00:03 03:37 00:04 03:11

FEC IMPAIRED ESCAPE 1.0 FEC INCAPACITATION 0.3 FEC INCAPACITATION 1.0 FED ASPHYXIATION 0.3 FED ASPHYXIATION 1.0

Figure 147 Scenario 24, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 148 Scenario 24, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 149 Scenario 24, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 150 Scenario 24, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 151 Scenario 24, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 152 Scenario 24, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Table 80 Scenario 24 atmospheric conditions

Test 1

Test 2

Test 3

Wind Speed (km/h)

  1. 41
  1. 55
  1. 65

Air Temp (°C)

  1. 94
  1. 44
  1. 33

Rel. Humidity (%)

  1. 96
  1. 29
  1. 24

Air Pressure (mbar)

  1. 07 1015.03
  1. 39
  1. 22 SCENARIO 25: Flaming chair in hallway, bedroom doors open

In this scenario, a flaming fire was initiated on the pad of a timber dining chair placed in the Hallway using a butane barbeque lighter. The flame was held in contact with the chair pad for 15 seconds and then removed. The chair pad continued to burn for approximately 12

minutes and self-extinguished when it was fully consumed. The flame did not spread to the MDF backing or the rubber wood chair frame.

Figure 153 Images of Scenario 25, Tests 1 (top), 2 (middle) and 3 (bottom).

Table 81 Scenario 25 smoke alarm activation times (min:sec) in the Hallway and Lounge room

TEST 1

TEST 2

TEST 3

POSITION Photo-electric Ionisation Dual

Multi Photo-electric Ionisation Dual

Multi Photo-electric Ionisation Dual

Multi

Hall Ceiling

  1. 04 2.93
  1. 98 2.42
  1. 52 2.75

Hall Wall

  1. 59 2.93
  1. 86 2.64
  1. 74 4.30

Hall Deadspace

  1. 71 2.68
  1. 98 2.53
  1. 07 3.30

Lounge Ceiling

  1. 82 2.57
  1. 61 2.53
  1. 94 4.63 3.53

Lounge Wall

  1. 05 3.93
  1. 53 3.74
  1. 30 4.74

Lounge

Dead-space 6.88 4.14 4.37

  1. 73 4.95
  1. 71 5.39

The irritant gases detected in the Hallway included significant amounts of acrolein (up to 1.9 ppm) and formaldehyde (0.8 ppm). The tenability limits for occupant incapacitation were not reached in the tests. The temperatures measured in the Hallway peaked at 29°C at the

ceiling from an initial 16.5°C (Test 2).

Table 82 Scenario 25 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres

TEST 1

TEST 2

TEST 3

Bed1 Hall Bed1 Hall Bed1 Hall FEC IMPAIRED ESCAPE 0.3 02:01 01:07

00:16

FEC IMPAIRED ESCAPE 1.0 FEC INCAPACITATION 0.3 FEC INCAPACITATION 1.0 FED ASPHYXIATION 0.3 FED ASPHYXIATION 1.0

Figure 154 Scenario 25, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 155 Scenario 25, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 156 Scenario 25, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 157 Scenario 25, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 158 Scenario 25, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 159 Scenario 25, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Table 83 Scenario 25 atmospheric conditions

Test 1

Test 2

Test 3

Wind Speed (km/h)

  1. 64
  1. 72
  1. 15

Air Temp (°C)

  1. 60
  1. 05
  1. 72

Rel. Humidity (%)

  1. 95
  1. 08
  1. 29

Air Pressure (mbar)

  1. 88
  1. 29
  1. 00
  1. 23 SCENARIO 26: Smouldering upholstered chair in hallway, bedroom doors open

In this scenario, a smouldering fire was initiated on an upholstered chair placed in the

Hallway using the soldering iron heated to 350°C. The element was left in contact with three cotton batting sheets for six minutes and then removed. The smoulder continued for some 15 minutes before self-extinguishing.

Figure 160 Images of Scenario 26, Tests 1 (top), 2 (middle) and 3 (bottom).

Table 84 Scenario 26 smoke alarm activation times (min:sec) in the Hallway and Lounge room

TEST 1

TEST 2

TEST 3

POSITION Photo-electric Ionisation Dual

Multi Photo-electric Ionisation Dual

Multi Photo-electric Ionisation Dual

Multi

Hall Ceiling 05:55 07:08

05:22 05:49

06:13 06:33

06:06 06:00

05:43 06:03

05:30 05:36

Hall Wall 05:15 06:48

05:55 04:49

06:26 06:52

06:06 06:00

05:49 06:03

06:16 05:23

Hall Deadspace 05:49 06:21

05:29 05:42

06:52 07:32

06:26 06:39

06:10 06:29

06:03 06:03

Lounge Ceiling

11:39

08:51

13:24

10:59 15:10

Lounge Wall

11:25 07:15

07:28 06:55

07:53 07:19

07:26 07:32

06:29 06:10

06:29 06:23

Lounge

Dead-space 14:36

18:07

13:35

16:20

11:05

11:32 13:04

The irritants detected in the Hallway included significant amounts of acrolein (up to 6.2 ppm) and formaldehyde (up to 3.5 ppm).

Table 85 Scenario 26 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres

TEST 1

TEST 2

TEST 3

Bed1 Hall Bed1 Hall Bed1 Hall FEC IMPAIRED ESCAPE 0.3 07:04 00:12 08:27 00:23 07:13 01:01 FEC IMPAIRED ESCAPE 1.0

03:52 09:59 10:03 12:47 06:36

FEC INCAPACITATION 0.3

03:52

11:33

06:52

FEC INCAPACITATION 1.0 FED ASPHYXIATION 0.3 FED ASPHYXIATION 1.0

Figure 161 Scenario 26, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 162 Scenario 26, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 163 Scenario 26, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 164 Scenario 26, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 165 Scenario 26, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.

Figure 166 Scenario 26, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.

Table 86 Scenario 26 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0

TEST 1

TEST 2

TEST 3

POSITION Photo-electric Ionisation Dual

Multi Photo-electric Ionisation Dual

Multi Photo-electric Ionisation Dual

Multi Hall Ceiling -2.06 -3.27 -1.50 -1.95 5.33 5.01 5.45 5.56 1.15 0.81 1.37 1.26 Hall Wall -1.39 -2.94 -2.06 -0.94 5.11 4.68 5.45 5.56 1.04 0.81 0.59 1.48 Hall Deadspace -1.95 -2.48 -1.61 -1.84 4.68 4.01 5.11 4.90 0.70 0.38 0.81 0.81

Lounge

Ceiling #N/A #N/A -7.78 #N/A #N/A #N/A 2.69 #N/A -6.53 #N/A -4.11 -8.30

Lounge

Wall -7.56 -3.38 -3.59 -3.05 3.67 4.23 4.12 4.01 0.38 0.70 0.38 0.49

Lounge

Dead-space -10.74 #N/A -14.25 #N/A -2.03 #N/A -4.78 #N/A -4.22 #N/A -4.66 -6.20

Table 87 Scenario 26 atmospheric conditions

Test 1

Test 2

Test 3

Wind Speed (km/h)

  1. 18
  1. 25
  1. 29

Air Temp (°C)

  1. 87
  1. 08
  1. 89

Rel. Humidity (%)

  1. 97
  1. 65
  1. 93

Air Pressure (mbar)

  1. 32
  1. 70
  1. 71

Fire research report -Smoke Alarms in Homes: Stage 2

Fire research report -Smoke Alarms in Homes: Stage 2

  1. 24 SCENARIO 27: Nuisance test -Burnt toast in the kitchen
  1. 24 SCENARIO 27: Nuisance test -Burnt toast in the kitchen

In this scenario, four slices of bread were placed in a portable grill in the kitchen and toasted on high heat for approximately 15 minutes. The door of the grill was left ajar to allow any smoke to escape. Smoke alarms activated include ionisation and dual alarms in the Lounge and Hallway and some duals in the bedrooms (Table 88 ).

N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Bedroom 1 Ceiling #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Bedroom 1 Wall #N/A #N/A 14.23 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Bedroom 1 Deadspace #N/A #N/A #N/A #N/A #N/A #N/A 14.26 #N/A #N/A #N/A 14.87 #N/A Bedroom 2 Ceiling #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Bedroom 2 Wall #N/A #N/A 15.32 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Bedroom 2 Deadspace #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

References

Air Pressure (mbar)

  1. 06 1014.98
  1. 86
  1. 25 SCENARIO 28: Nuisance test - Steam from the bathroom

In this scenario, a hot water urn was used to generate steam in the bathroom to simulate the steam from a shower. The test began when the sliding door to the bathroom was opened

and the steam was released into the Hallway.

Figure 168 Scenario 28 set up

The only alarms to activate during these tests were the photoelectric alarms in the ceiling position in the hallway.

Table 90 Scenario 28 smoke alarm activation times (min:sec)

TEST 1

TEST 2

TEST 3

POSITION Photo-electric Ionisation Dual

Multi Photo-electric Ionisation Dual

Multi Photo-electric Ionisation Dual

Multi Hall Ceiling 02:54 #N/A #N/A #N/A 03:21 #N/A #N/A #N/A 01:53 #N/A #N/A #N/A Hall Wall

Hall Deadspace

Lounge

Ceiling

Lounge

Wall

Lounge

Dead-space

Bedroom 1

Ceiling

Bedroom 1

Wall

Bedroom 1

Deadspace

Bedroom 2

Ceiling

Bedroom 2

Wall

Bedroom 2

Deadspace #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

Table 91 Scenario 28 atmospheric conditions

Test 1

Test 2

Test 3

Wind Speed (km/h)

  1. 01
  1. 20
  1. 80

Air Temp (°C)

  1. 20
  1. 93
  1. 89

Rel. Humidity (%)

  1. 50
  1. 18
  1. 12

Air Pressure (mbar)

  1. 30 1001.40
  1. 42
  1. 26 SCENARIO 29: Nuisance test – Cigarettes in the Lounge room

In this scenario, two cigarettes are lit and left to smoulder in an ashtray placed on the coffee table in the Lounge.

Figure 169 Scenario 29 set up

In all tests, the cigarettes continued to smoulder for nine to 12 minutes. No smoke alarms activated in the tests.

Table 92 Scenario 29 atmospheric conditions

Test 1

Test 2

Test 3

Wind Speed (km/h)

  1. 37
  1. 57
  1. 75

Air Temp (°C)

  1. 36
  1. 87
  1. 93

Rel. Humidity (%)

  1. 21
  1. 82
  1. 42

Air Pressure (mbar)

  1. 44 1011.49
  1. 32
  1. 27 SCENARIO 30: Nuisance test – Incense candles in the Lounge

In this scenario, three incense candles are lit and left to burn in a holder placed on the coffee table in the Lounge.

Figure 170 Scenario 30 set up

Table 93 Scenario 30 smoke alarm activation times (min:sec)

TEST 1

TEST 2

TEST 3

POSITION Photo-electric Ionisation Dual

Multi Photo-electric Ionisation Dual

Multi Photo-electric Ionisation Dual

Multi

Hall Ceiling

N/A #N/A

Hall Wall

Hall Deadspace

Lounge

Ceiling #N/A #N/A 00:51 #N/A #N/A #N/A #N/A #N/A #N/A 08:27 09:07 #N/A

Lounge

Wall

Lounge

Dead-space

Bedroom 1

Ceiling

Bedroom 1

Wall

Bedroom 1

Deadspace

Bedroom 2

Ceiling #N/A 07:26 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Bedroom 2

Wall

Bedroom 2

Deadspace #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

Table 94 Scenario 30 atmospheric conditions

Test 1

Test 2

Test 3

Wind Speed (km/h)

  1. 68
  1. 75
  1. 61

Air Temp (°C)

  1. 34
  1. 24
  1. 45

Rel. Humidity (%)

  1. 25
  1. 64
  1. 13

Air Pressure (mbar)

  1. 85 1012.58
  1. 80
  1. Analysis and Discussion
  1. 1 Activation times by alarm type

In the evaluation of smoke alarm performance, as can be seen from the results presented in Section 3, a multitude of factors may contribute to variations between tests. A nondimensional analysis technique was proposed by Milarcik, Elenick, & Roby (2008) whereby the activation time for a particular smoke detector in a specific test is normalised (or

weighted) based on the activation time of the first alarm in that location. This technique

eliminates the test-specific variables related to fire type and intensity, fire development, and smoke travel and allows the direct comparison of the detector technologies and sensitivities.

Milarcik et al. (2008) compared smoke alarm responses using the Common Language Effect Size (CLES) statistic, which measures the extent of overlap of two population distributions

with a continuous dependent variable (normalised activation times). The CLES method

assumes that the independent samples follow a normal distribution. For the comparison of non-parametric and dissimilar distributions, as in our case, the Kruskal-Wallis H test can be used to compare mean ranks of normalised activation times across multiple categories

(alarm types). Using this method, the technology with the lowest mean rank has the lowest activation time, i.e. is the quickest.

When we take into account all 48 of the alarms installed in the unit and a possible 3,888

activations, the Kruskal-Wallis H test showed a statistically significant difference in

normalised activation times between the different alarm types, χ2(3) = 336.796, p < .05, with a mean rank of 2254.00 for photoelectric alarms, 1799.79 for ionisation alarms, 1488.39 for dual alarms and 2235.82 for multi alarms. Post-hoc tests revealed significant differences

between the dual alarms and ionisation alarms, χ2(1) = 311.406, p < .05, dual and multi

alarms, χ2(1) = -747.436, p < .05, dual and photoelectric alarms, χ2(1) = 765.609, p < .05,

ionisation and multi alarms, χ2(1) = -436.030, p < .05, and ionisation and photoelectric

alarms, χ2(1) = 454.203, p < .05.

Excluding the nuisance tests, the Kruskal-Wallis H test on the 3,312 activations showed

similar results, with a statistically significant difference in normalised activation times

between the different alarm types, χ2(3) = 381.524, p < .05, with a mean rank of 1973.70 for photoelectric alarms, 1499.81 for ionisation alarms, 1210.75 for dual alarms and 1941.74 for multi alarms. Post-hoc tests revealed significant differences between the dual alarms and

ionisation alarms, χ2(1) = 289.059, p < .05, dual and multi alarms, χ2(1) = -730.986, p < .05,

Fire research report -Smoke Alarms in Homes: Stage 2

Fire research report -Smoke Alarms in Homes: Stage 2

Abstract

dual and photoelectric alarms, χ 2 (1) = 762.944, p < .05, ionisation and multi alarms, χ 2 (1) = -441.927, p < .05, and ionisation and photoelectric alarms, χ 2 (1) = 473.885, p < .05.

  1. 2 Smoke alarm activations in smouldering tests
  1. 2 Smoke alarm activations in smouldering tests

In smouldering tests (1,584 possible activations), the Kruskal-Wallis H test showed a statistically significant difference in normalised activation times between the different alarm types, χ 2 (3) = 207.189, p < .05, with a mean rank of 829.41 for photoelectric alarms, 1,000.00 for ionisation alarms, 548.28 for dual alarms and 792.31 for multi alarms. Post-hoc tests revealed significant differences between the dual alarms and multi alarms, χ 2 (1) = -244.035, p < .05, dual and photoelectric alarms, χ 2 (1) = 281.133, p < .05, dual and ionisation alarms, χ 2 (1) = 451.721, p < .05, multi and ionisation alarms, χ 2 (1) = 207.686, p < .05, and photoelectric and ionisation alarms, χ 2 (1) = -170.588, p < .05.

Paired samples t-tests showed significant differences between activation times for five of the six different smoke alarm pairs in smouldering fires. There was a significant difference between activation times for photoelectric alarms (M = 9.55, SD = 6.85) and ionisation alarms (M = 10.05, SD = 6.91); t(179) = -2.585, p < .05, with photoelectric alarms on average 29.9 seconds faster than ionisation alarms. Dual alarms (M = 8.99, SD = 6.51) were significantly faster than ionisation alarms (M = 10.04, SD = 6.95); t( 189 dual alarms (M = 10.85, SD = 7.17) were faster by an average of 47.3 seconds; t(267) = -3.753, p < .05. There were no significant differences between activation times for photoelectric and multi-criteria alarms in smouldering fires.

  1. 3 Smoke alarm activations in flaming tests
  1. 3 Smoke alarm activations in flaming tests

In flaming tests (1,728 possible activations), the Kruskal-Wallis H test showed a statistically significant difference in normalised activation times between the different alarm types, χ 2 (3) = 641.198, p < .05, with a mean rank of 1,154.80 for photoelectric alarms, 484.87 for ionisation alarms, 659.56 for dual alarms and 1158.78 for multi alarms. Post-hoc tests revealed significant differences between the ionisation alarms and dual alarms, χ 2 (1) = -174.686, p < .05, ionisation and photoelectric alarms, χ 2 (1) = 669.926, p < .05, ionisation and

References

Fire research report -Smoke Alarms in Homes: Stage 2

Fire research report -Smoke Alarms in Homes: Stage 2

Abstract

Copyright NSW State Government (FRNSW) multi alarms, χ 2 (1) = -673.911, p < .05, dual and photoelectric alarms, χ 2 (1) = 495.240, p < .05, and dual and multi alarms, χ 2 (1) = -499.225, p < .05. Paired samples t-tests showed significant differences between activation times for four of the six different smoke alarm pairs in flaming fires. There was a significant difference between activation times for photoelectric alarms (M = 4.22, SD = 3.35) and ionisation alarms (M = 3.50, SD = 3.20); t(259) = 9.157, p < .05, with ionisation alarms on average 43.1 seconds faster than photoelectric alarms. Ionisation alarms (M = 3.40, SD = 3.24) were significantly faster than multi-criteria alarms (M = 4.14, SD = 3.42); t(258) = -9.095, p < .05, by an average of 44.8 seconds. Dual alarms (M = 3.50, SD = 2.93) were significantly faster than photoelectric alarms (M = 4.21, SD = 3.36); t(257) = 8.277, p < .05, by an average of 52.9 seconds. Dual alarms (M = 3.38, SD = 2.94) were significantly faster than multi-criteria alarms (M = 4.14, SD = 3.42); t(256) = -8.352, p < .05, by an average of 45.2 seconds.

Abstract

There were no significant differences between activation times for ionisation and dual alarms, and between photoelectric and multi-criteria alarms in flaming fires.

  1. 4 Non-activations and nuisance alarms
  1. 4 Non-activations and nuisance alarms

The factor that significantly affected the results of photoelectric and multi-criteria alarms was the non-activations, especially in flaming fires, which were included in the analysis. Nonactivations had been removed by Milarcik et al. (2008) in their study. The flaming fires in this test series were small scale and did not produce enough large smoke particles to trigger the photoelectric sensors.

Of a possible 828 ROO alarm activations (nuisance tests excluded), there were 100 (12%) non-activations recorded in the testing. Table 95 below shows the breakdown by alarm type. One-way between subjects ANOVA was conducted to compare non-activations for photoelectric, ionisation, dual and multi alarms. There was a significant difference between non-activation rates for the four alarm types [F(3, 824) = 24.563, p < .05]. Post hoc comparisons using the Tukey HSD test indicated that the photoelectric alarms (24.6%) and

References

multi alarms (17.4%) had significantly more ROO non-activations than the ionisation (M =

  1. 3%) and dual alarms (M = 1.9%).

Hallway alarms had similar results with 20.5% non-activations and one-way ANOVA also

indicating significant differences between the four alarm types [F(3, 824) = 16.989, p < .05]. Post hoc comparisons found that the photoelectric alarms (M = 30.4%, SD = 46.1%) and

multi alarms (M = 29.0%, SD = 45.5%) had significantly more Hallway non-activations than the ionisation (M = 15.9%, SD = 36.7%) and dual alarms (M = 6.8%, SD = 25.2%).

The nuisance tests found that ionisation alarms and dual alarms were most likely to activate due to nuisance sources, while multi alarms did not activate at all. Of a possible 144 alarm activations in the room of origin, there were 15 (10.4%) activations. One-way ANOVA found a significant difference between activation rates for the four alarm types [F(3, 140) = 3.638, p < .05]. Post hoc comparisons showed that dual alarms had significantly more nuisance

activations than multi alarms.

Nuisance alarms are a major cause of smoke alarms being deactivated in homes by the

occupants (Fazzini, Perkins, & Grossman, 2000). The four nuisance scenarios investigated in this series produced few activations, which were dependent on the source, the vicinity of the alarm, and the atmospheric conditions at the time of the test.

Scenario 27, which involved burning toast/sandwiches under a grill, resulted in activation of the ionisation and dual-type alarms located in the Lounge and Hall, and a scattering of dualtype alarms in the Bedrooms. The alarms activated after at least nine minutes of cooking, at which time, while there was little visible smoke, the smell of burnt toast was present. There were no activations of photoelectric or multi-criteria alarms in this Scenario.

Scenario 28, which involved steam from the bathroom, produced only activations from the

nearest photoelectric alarm at the Hallway ceiling. The activations occurred after the door to the bathroom had been opened for about two or three minutes.

Scenario 29 involved smoke from a couple of cigarettes left burning in an ashtray on the

coffee table in the Lounge room. While no alarms activated in all three tests, it was observed during trials that activation of alarms did occur when the smoke was able to reach them. Due to the warm outside ambient temperatures, the temperature gradients within the unit (up to

  1. 4 degrees C difference between temperatures measured at 0.5 metres from the floor and ceiling height in this Scenario) and the low heat release of the cigarette smoke, stratification

of the smoke plume occurs, which prevents smoke from reaching the smoke alarms. It was noted that five of the six cigarettes used continued to burn for their entire lengths, while one stopped at approximately one centimetre from the butt (filter). Note that the mandatory

standard for reduced fire risk cigarettes (Trade Practices (Consumer Product Safety

Standard)(Reduced Fire Risk Cigarettes) Regulations 2008), which applies to all cigarettes sold in Australia from 23 September 2010, requires that at least 75% of the cigarettes that

are tested (in accordance with AS 4830 (Standards Australia, 2007)) in a test trial must fail to achieve full length burns” (ACCC, 2010). In the smouldering tests using a lit cigarette

(Scenarios 7b and 14b), all cigarettes used were successful in causing a sustained smoulder when left on a pile of cotton batting.

  1. 5 Toxic tenability

A comparison was made of smoke alarm activation times with the times at which tenability

limits were reached in the Bedrooms and the Hallway. The available safe egress time

(ASET) is the time between smoke alarm activation and the time at which the calculated

fractional effective concentration (FEC) for occupant incapacitation reaches 0.3. The ASET is deemed adequate if it is greater than the required safe egress time (RSET) of 135

seconds.

Smouldering fires involved an assortment of materials including cotton, polyester,

polypropylene, polyurethane, polyvinyl chloride and polyethylene, which produced smoke

containing significant levels of acrolein, formaldehyde, phenol and sulfur dioxide. In the

bedroom fires, tenability limits in the ROO were reached typically in around ten to 12 minutes whether the door was open or closed. When tenability limits were reached in the bedroom, it was found that only 35.7% of alarms provided sufficient ASET. When tenability limits were

reached in the hallway, 54.8% of alarms provided sufficient. Table 96 and Table 97 below

summarise smoke alarm performance in terms of calculated ASETs before Bedroom and

Hallway tenability limits are reached. All room of origin and Hallway alarms were included

except for those installed in the dead space positions.

Table 96 Smoke alarm ASET before tenability limit is reached in the Bedroom

PHOTOELECTRIC

IONISATION

DUAL

MULTI

Smouldering Flaming Smouldering Flaming Smouldering Flaming Smouldering Flaming

Adequate (ASET > RSET)

  1. 4%
  1. 0%
  1. 6%
  1. 0%
  1. 0%
  1. 0%
  1. 9%
  1. 0%

Inadequate (ASET < RSET)

  1. 1%
  1. 0%
  1. 1%
  1. 0%
  1. 0%
  1. 0%
  1. 9%
  1. 0%

None (ASET < 0)

  1. 5%
  1. 0%
  1. 3%
  1. 0%
  1. 0%
  1. 0%
  1. 2%
  1. 0%

Table 97 Smoke alarm ASET before tenability limit is reached in the Hallway

PHOTOELECTRIC

IONISATION

DUAL

MULTI

Smouldering Flaming Smouldering Flaming Smouldering Flaming Smouldering Flaming

Adequate (ASET > RSET)

  1. 8%
  1. 5%
  1. 1%
  1. 9%
  1. 3%
  1. 4%
  1. 0%
  1. 5%

Inadequate (ASET < RSET)

  1. 9%
  1. 0%
  1. 8%
  1. 1%
  1. 6%
  1. 6%
  1. 3%
  1. 5%

None (ASET < 0)

  1. 3%
  1. 5%
  1. 0%
  1. 0%
  1. 1%
  1. 0%
  1. 7%
  1. 0%

Analysis of the levels of toxic gases in the bedrooms and along the path of egress revealed that overall smoke alarm performance was poor in terms of the provision of adequate

warning for the safe egress of occupants. This is in agreement with prior research

(Engelsman, 2015). In the Bedroom, smoke alarms provided inadequate to no egress time for occupants during flaming fires, and were only adequate in up to 42% of smouldering fires in which the tenability limit was reached.

The poor performance of current smoke alarm technologies in terms of toxicity tenability is a cause for concern. The results indicate that current technologies are incapable of providing sufficient warning in flaming fires and require improvement for smouldering fires. There is a need to include in the smoke alarm standards a means to assess performance in terms of

available safe egress times.

  1. Conclusions and Recommendations

In this comprehensive study on smoke alarm activations in residential fires it was found that of the four alarm types tested, dual photoelectric/ionisation alarms were overall the quickest to activate, while only ionisation alarms activated earlier than dual alarms in fast flaming fires only.

Testing revealed that non-activation rates were high for photoelectric and multi-criteria

alarms, while ionisation and dual-type alarms were more likely to activate due to nuisance

sources such as cooking fumes, cigarette smoke, and burning incense.

Analysis of the levels of toxic gases in the bedrooms and along the path of egress revealed that overall smoke alarm performance was poor in terms of the provision of adequate

warning for the safe egress of occupants. It was found that often tenability limits were

reached in the room of origin before hallway alarms were activated. Hallway alarms did not activate at all when the door to the room of origin was closed. This reinforces the

recommendations by FRNSW in Stage 1, that smoke alarms be required in all hallways,

bedrooms and living spaces, and should be interconnected (Engelsman, 2015).

Smoke alarms are an essential component in a suite of fire safety measures used to protect occupants from residential fires. The results indicate that current technologies are incapable of providing sufficient warning in flaming fires and that there is a need to improve tenability performance of smoke alarms in smouldering fires where smoke alarms have the potential to provide notification for the safe egress of occupants.

Considering the findings of the study, FRNSW notes a number of measures that can be

implemented to improve fire safety in residential settings:

• Smoke alarms required in every living space, bedroom and hallway

• All smoke alarms within a residence to be interconnected

• Improvement of smoke alarm performance by including toxic tenability performance requirements in the standards, and

• The use of automated fire suppression systems (home sprinklers) to be used to mitigate fast flaming fires in residences.

  1. References

ACCC. (2010, November). Reduced fire risk cigarettes: Supplier guide. Australian

Competition and Consumer Commission. Retrieved from

https://www.accc.gov.au/system/files/Reduced%20fire%20risk%20cigarettes%20-

%20supplier%20guide.pdf

Australian Building Codes Board. (2016, February). National Construction Code Volume Two

  • Building Code of Australia Class 1 and Class 10 Buildings. Retrieved from

http://www.abcb.gov.au/Resources/Publications/NCC/NCC-2016-Volume-Two

Babrauskas, V. (2003). Ignition handbook: Principles and applications to fire safety

engineering, fire investigation, risk management and forensic science. Issaquah, WA: Fire Science Publishers.

Engelsman, M. (2015). Smoke Alarms in Homes: An Analysis (Fire Research Report No.

D15/102527). Greenacre, NSW: Fire & Rescue New South Wales.

Fazzini, T. M., Perkins, R., & Grossman, D. (2000). Ionization and photoelectric smoke

alarms in rural Alaskan homes. Western Journal of Medicine, 173(2), 89–92.

Milarcik, E., Elenick, S., & Roby, R. (2008). A relative time analysis of the performance of

residential smoke detection technologies. Fire Technology, 44(4), 337–349.

National Fire Protection Association., & Society of Fire Protection Engineers. (2002). SFPE handbook of fire protection engineering. Quincy, Mass.; Bethesda, Md.: National Fire Protection Association ; Society of Fire Protection Engineers.

Novozhilov, V., Shi, L., Guerrieri, M., Moinuddin, K., Bruck, D., & Joseph, P. (2015).

Australian Building Codes Board’s Domestic Smoke Alarm Study: Ionisation versus Photoelectric. Melbourne, Australia: Victoria University.

Standards Australia. (2007). AS 4830-2007 Determination of the extinction propensity of

cigarettes (Standard No. AS 4830-2007). Sydney: Standards Australia.

Standards Australia. (2014). AS 3786 - 2014 Smoke alarms using scattered light, transmitted light or ionization (Standard No. AS 3786: 2014). Sydney: Standards Australia.

US Environmental Protection Agency. (2016). Access Acute Exposure Guideline Levels

(AEGLs) Values. Retrieved 7 May 2016, from https://www.epa.gov/aegl/accessacute-exposure-guideline-levels-aegls-values

APPENDIX A Furnishing materials used in testing

Table A1. Furnishing materials

Item

Materials

Double beds

Aluminium frame, timber slats (pine)

Mattresses

Polyurethane foam, polyester cover

Pillows and quilts

100% polypropylene outer, 100% polyester fill

Pillow cases and quilt covers

52% polyester, 48% cotton

Two-seater sofa

Polyester cover, polyurethane foam inner, timber frame

Sofa cushions

100% polyester outer and fill

Chairs

Timber laminate, chipboard, polyurethane foam padding, polyester cover

Waste bins

Steel mesh

Tea towels

100% cotton

Fire research report -Smoke Alarms in Homes: Stage 2

Fire research report -Smoke Alarms in Homes: Stage 2

References

Table B1. Tenability limits used in gas calculations – cont.

Effective concentration for Escape Impairment (ppm) [REF]

Effective concentration for

Incapacitation (ppm)

[REF]

Lethal Effective Dose (ppm.min)

[REF]

Phenol C6H5OH

29

[AEGL]

-

-

Propane C3H8

17000

[AEGL]

33000

[AEGL]

990000

[AEGL]

Propene C3H6

-

-

-

p-Xylene C8H10

2500

[AEGL]

3600

[AEGL]

108000

[AEGL]

Styrene C8H8

230

[AEGL]

1900

[AEGL]

57000

[AEGL]

Sulfur dioxide SO2

24

[SFPE]

120

[SFPE]

12000

[SFPE]

Toluene C7H8

1400

[AEGL]

5200

[AEGL]

156000

[AEGL]

APPENDIX C CSIRO Smoke Alarm Verification Test Reports

XF3033/R1 Test Report 1 XF3033/R3 Test Report 2

The tests reported in XF3033/R1 and XF3033/R3 were conducted by CSIRO

Infrastructure Technologies to pre-qualify the alarm response threshold (sensitivity) and directional dependence of smoke alarms used in this research. The results

were used to verify that all alarms used in the study were operable prior to

installation in real fire test scenarios.