Fire & Rescue NSW
8 Fire research report – Smoke Alarms in Homes: Stage 2
Page 1
〔图〕NSWGOVERNMENT\n
Fire & Rescue NSW
Fire research report
Smoke Alarms in Homes: Stage 2
〔图〕插图 This fire research report provides an analysis of smoke alarm performance with respect to type, position, location and toxic gas tenability limits in simulated residential fires
Fire research report – Smoke Alarms in Homes: Stage 2
Page 2
| Version | Date | Reviewed by | Authorised by |
|---|---|---|---|
| Version A | 10/12/2017 | Mark Whybro | "This file is not in the file. |
Document ID: Version A
Document Authors:
Kim Thai, Research Officer, Fire Investigation and Research Unit
Superintendent Jeremy Fewtrell, Manager Fire Investigation and Research Unit
SO Morgan Cook, Fire Research Team Leader, Fire Investigation and Research Unit
SF David O'Brien, Fire Research Officer, Fire Investigation and Research Unit
Pheo Duong, Research Assistant, Fire Investigation and Research Unit
Mark Whybro, Assistant Commissioner Community Safety
Acknowledgements
We would like to acknowledge the support of the Australian Building Codes Board (ABCB) in the funding half of the costs of this study.
We would also like to thank the following individuals and organisations who contributed their time, expertise, and technical and operational support in Stage 2 of this project:
· Fire Investigation & Research Unit (FIRU) – SO Morgan Cook, Diana Cornish, SF Bernard Daly, James Du, Pheo Duong, LSO Colin Eldridge, QF Michelle Engelsman, SO Phillip Etienne, Supt Jeremy Fewtrell, LSO Michael Forbes, A/Supt Graham Kingsland, SF David O'Brien, SO Wayne Schweickle, Kim Thai, SF Joel Walton.
● Community Safety – Assistant Commissioner Mark Whybro, Chief Superintendent Chris Lewis, Rachel Hughes
· Fire Fighting Operational Training (FFOT), Londonderry
· Bill Nastevski – Facilities Management (COMSER)
· CSIRO, Fire Systems and Acoustics – Dr Christopher Preston, Alex Tang, Rex Pollard
· ABCB – Dr Brian Ashe
· Brooks Alarms – Chris Orr
· System Sensor, Honeywell Alarms – Phillip Bush
· Chubb/Quell Alarms – David Laundry
· First - David Isaac
Document ID: Version A
Issued: 10 Dec 2017
Copyright NSW State Government (FRNSW)
Executive Summary
Modern day furnishings and building materials used in homes have dramatically changed the dynamics of residential fires. The combustion of widely used synthetic materials produces
faster fires with higher levels of heat and toxic smoke than natural materials, leading to
significantly decreased tenability windows for the safe egress of residents. Functional smoke alarms remain the primary means of alerting occupants to fires; however, questions arise as to their effectiveness in the modern home and whether the type and location of smoke
alarms play a role.
In 2014, FRNSW commenced a research project to assess the effectiveness of residential
smoke alarms. The project, conducted by the Fire Investigation & Research Unit (FIRU),
sought to assess any differences in performance between photoelectric, ionisation and dualsensor smoke alarms in their responses to smouldering and flaming fires. A key focus of the research was assessing whether smoke alarms provided adequate notification to allow
occupants to exit a dwelling before tenability limits for temperature and toxic gases were
reached. A comprehensive literature review and analysis of FRNSW incident data for the
preceding 15 years was completed before an initial series of 10 research burns were
conducted in a full scale replica residence built at the FIRU Fire Research Facility at
Londonderry, NSW. The research identified that ionisation alarms were inferior to
photoelectric and dual alarms in most fire scenarios, and that current smoke alarms failed to provide sufficient notification for safe egress when located only in the Hallway as required
under current legislation.
In response to the report, the Australian Building Codes Board (ABCB) commissioned a
critical review of the FRNSW research and other existing literature by the Centre for
Environmental and Risk Engineering at Victoria University. The review identified that the
FRNSW smoke alarm research was based on too few tests, did not consider an adequate
range of fire scenarios, and that the ignition methods were not representative of real
scenarios.
Based on feedback from the ABCB-commissioned review, FRNSW conducted a further
series of tests, which included:
• Four smoke alarm types: photoelectric, ionisation, dual-sensor (photoelectric and ionisation) and multi-criteria (photoelectric and heat);
• A total of 48 smoke alarms, in clusters of four, in various locations within the
residence. This included the ceiling, wall and dead space positions in each
bedroom, hallway and living space.
• 27 test scenarios, including 10 smouldering fires, 13 flaming fires and four nuisance tests. Each scenario was repeated three times.
Testing found that of the four alarm types tested, dual-sensor alarms were overall the
quickest to activate, while only ionisation alarms activated earlier than dual alarms in fast
flaming fires.
The tests also revealed that non-activation rates were high for photoelectric and multi-criteria alarms, while ionisation and dual alarms were more likely to activate due to nuisance
sources such as cooking fumes, cigarette smoke, and burning incense.
Analysis of the levels of toxic gases in the bedrooms and along the path of egress revealed that overall smoke alarm performance was poor in terms of the provision of adequate
warning for the safe egress of occupants. It was found that often tenability limits were
reached in the room of origin before hallway alarms were activated. Hallway alarms did not activate at all when the door to the room of origin was closed. This reinforces the
recommendations by FRNSW in Stage 1, that smoke alarms be required in all hallways,
bedrooms and living spaces, and should be interconnected (Engelsman, 2015).
Smoke alarms are an essential component in a suite of fire safety measures used to protect occupants from residential fires. The results indicate that current technologies are incapable of providing sufficient warning in flaming fires and that there is a need to improve tenability performance of smoke alarms in smouldering fires where smoke alarms have the potential to provide notification for the safe egress of occupants.
Considering the findings of the study, FRNSW notes a number of measures that can be
implemented to improve fire safety in residential settings:
• Smoke alarms required in every living space, bedroom and hallway
• All smoke alarms within a residence to be interconnected
• Improvement of smoke alarm performance by including toxic tenability performance requirements in the standards, and
• The use of automated fire suppression systems (home sprinklers) to be used to mitigate fast flaming fires in residences.
Table of Contents
Acknowledgements ............................................................................................................... 2
Executive Summary .............................................................................................................. 3
Nomenclature ....................................................................................................................... 7
List of Figures ....................................................................................................................... 8
List of Tables ...................................................................................................................... 20
- Introduction ..................................................................................................................... 25
- Methodology ................................................................................................................... 26
- 1 Burn unit and furnishings ............................................................................................................ 26
- 2 Test scenarios ............................................................................................................................. 28
- 3 Fire ignition and extinguishment ................................................................................................. 29
- 4 Smoke alarms ............................................................................................................................. 30
- 5 Instrumentation ........................................................................................................................... 32
- 6 Data Analysis .............................................................................................................................. 32
- 7 Study Limitations ......................................................................................................................... 33
- Results ............................................................................................................................ 33
- 1 SCENARIO 1: Smouldering bedding fire in Bedroom 1, door closed ......................................... 33
- 2 SCENARIO 2: Smouldering bedding fire in Bedroom 2, doors open ......................................... 41
- 3 SCENARIO 3: Smouldering lounge fire in lounge room, Bedroom 2 door closed ...................... 47
- 4 SCENARIO 5: Flaming bedding fire in Bedroom 2, bedroom doors open .................................. 53
- 5 SCENARIO 7a: Smouldering bedding fire in Bedroom 1, doors open ....................................... 59
- 6 SCENARIO 7b: Smouldering bedding fire in Bedroom 1, doors open, cigarette ignition ........... 65
- 7 SCENARIO 10: Flaming fire in Bedroom 1, bedroom doors open ............................................. 70
- 8 SCENARIO 11: Smouldering electrical fire in kitchen, bedroom doors open ............................. 75
- 9 SCENARIO 12: Flaming electrical fire in kitchen, bedroom doors open .................................... 80
- 10 SCENARIO 13: Flaming lounge fire in lounge room, bedroom doors open ............................. 86
- 11 SCENARIO 14a: Smouldering lounge fire in lounge room, bedroom doors open .................... 92
- 12 SCENARIO 14b: Smouldering lounge fire in lounge room, bedroom doors open .................... 97
- 13 SCENARIO 15: Flaming paper fire in lounge room, bedroom doors open ............................. 103
- 14 SCENARIO 16: Flaming chair fire in lounge, bedroom doors open ....................................... 109
- 15 SCENARIO 17: Flaming cooking oil fire in kitchen, bedroom doors open .............................. 115
- 16 SCENARIO 18: Flaming tea towel fire in kitchen, bedroom doors open ................................ 121
- 17 SCENARIO 19: Smouldering iron in the laundry, bedroom doors open ................................. 127
- 18 SCENARIO 20: Smouldering iron in the laundry, laundry door closed ................................... 133
- 19 SCENARIO 22: Flaming bedding in Bedroom 1, Bedroom 1 door closed.............................. 139
- 20 SCENARIO 23: Flaming paper fire in Bedroom 2, bedroom doors open ............................... 145
- 21 SCENARIO 24: Flaming paper fire in Bedroom 2, Bedroom 1 closed ................................... 151
- 22 SCENARIO 25: Flaming chair in hallway, bedroom doors open ............................................ 157
- 23 SCENARIO 26: Smouldering upholstered chair in hallway, bedroom doors open ................. 163
- 24 SCENARIO 27: Nuisance test - Burnt toast in the kitchen ..................................................... 169
- 25 SCENARIO 28: Nuisance test - Steam from the bathroom .................................................... 170
- 26 SCENARIO 29: Nuisance test – Cigarettes in the Lounge room ............................................ 171
- 27 SCENARIO 30: Nuisance test – Incense candles in the Lounge ........................................... 172
- Analysis and Discussion................................................................................................ 173
- 1 Activation times by alarm type .................................................................................................. 173
- 2 Smoke alarm activations in smouldering tests .......................................................................... 174
- 2 Smoke alarm activations in flaming tests .................................................................................. 174
- 2 Non-activations and nuisance alarms ....................................................................................... 175
- 3 Toxic tenability .......................................................................................................................... 177
- Conclusions and Recommendations ............................................................................. 179
- References ................................................................................................................... 180
APPENDIX A Furnishing materials used in testing ............................................................ 182
APPENDIX B Tenability Criteria ........................................................................................ 183
APPENDIX C CSIRO Smoke Alarm Verification Test Reports .......................................... 185
Nomenclature
ANOVA
Analysis of variance. Variance is a measure based on the squared deviations of individual scores/observations from the mean. ANOVA analyses the
differences between independent group means.
F
F statistic, ratio of two mean square values
M
Mean value, the average value of a distribution
N
Sample size or population size
p
Statistical significance level p = α
SD
Standard deviation, a measure of variability defined as the square root of the variance
χ2
Chi-square statistic, a measurement of how results compare with expected values.
Fire research report – Smoke Alarms in Homes: Stage 2
Page 8
List of Figures
Figure 1 Layout of two-bedroom residence showing positions of smoke alarms thermocouples and gas probes $\blacksquare$ $\ldots$ 26
Figure 2 Soldering iron and cotton batting sheets used to initiate smouldering fires $\ldots$ 29
Figure 3 Butane BBQ lighter used in lighting flaming fires, pictured here used in lighting incense $\ldots$ 30
Figure 4 Diagram defining the dead air space and correct smoke alarm placement according to the Australian Building Codes Board (2016, p. 279) $\ldots$ 31
Figure 5 Wiring to the smoke alarm sounder $\ldots$ 31
Figure 6 Before (left) and after (right) photographs of Scenario 1, Tests 1 (top), 2 (middle) and 3 (bottom) $\ldots$ 34
Figure 7 Scenario 1, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. $\ldots$ 36
Figure 8 Scenario 1, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED... 37 Figure 9 Scenario 1, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. $\ldots$ 37
Figure 10 Scenario 1, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and FED. $\ldots$ 38
Figure 11 Scenario 1, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. $\ldots$ 38
Figure 12 Scenario 1, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED... 39 Figure 13 Before (left) and after (right) photographs of Scenario 2, Tests 1 (top), 2 (middle) and 3 (bottom) ......................................................................................................................................................................................................................
Figure 14 Scenario 2, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED. $\ldots$ 43
Figure 15 Scenario 2, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED... 43
Figure 16 Scenario 2, Test 2 smoke alarm activation times by type in comparison with
calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 44
Figure 17 Scenario 2, Test 2 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 44 Figure 18 Scenario 2, Test 3 smoke alarm activation times by type in comparison with
calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 45
Figure 19 Scenario 2, Test 3 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 45 Figure 20 Before (left) and after (right) photographs of Scenario 3, Tests 1 (top), 2 (middle)
and 3 (bottom)..................................................................................................................... 47
Figure 21 Scenario 3, Test 1 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 49
Figure 22 Scenario 3, Test 1 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 49 Figure 23 Scenario 3, Test 2 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 50
Figure 24 Scenario 3, Test 2 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 50 Figure 25 Scenario 3, Test 3 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 51
Figure 26 Scenario 3, Test 3 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 51 Figure 27 Before (left) and after (right) photographs of Scenario 5, Tests 1 (top), 2 (middle)
and 3 (bottom)..................................................................................................................... 53
Figure 28 Scenario 5, Test 1 smoke alarm activation times by type in comparison with
calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 55
Figure 29 Scenario 5, Test 1 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 55
Figure 30 Scenario 5, Test 2 smoke alarm activation times by type in comparison with
calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 56
Figure 31 Scenario 5, Test 2 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 56 Figure 32 Scenario 5, Test 3 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 57
Figure 33 Scenario 5, Test 3 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 57 Figure 34 Before (left) and after (right) photographs of Scenario 7a, Tests 1 (top), 2 (middle)
and 3 (bottom)..................................................................................................................... 59
Figure 35 Scenario 7a, Test 1 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 61
Figure 36 Scenario 7a, Test 1 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 61 Figure 37 Scenario 7a, Test 2 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 62
Figure 38 Scenario 7a, Test 2 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 62 Figure 39 Scenario 7a, Test 3 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 63
Figure 40 Scenario 7a, Test 3 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 63 Figure 41 Before (left) and after (right) photographs of Scenario 7b, Tests 1 (top), 2 (middle)
and 3 (bottom)..................................................................................................................... 65
Figure 42 Scenario 7b, Test 1 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 66
Figure 43 Scenario 7b, Test 1 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 67
Figure 44 Scenario 7b, Test 2 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 67
Figure 45 Scenario 7b, Test 2 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 68 Figure 46 Scenario 7b, Test 3 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 68
Figure 47 Scenario 7b, Test 3 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 69 Figure 48 Before (left) and after (right) photographs of Scenario 10, Tests 1 (top), 2 (middle)
and 3 (bottom)..................................................................................................................... 70
Figure 49 Scenario 10, Test 1 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 71
Figure 50 Scenario 10, Test 1 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 72 Figure 51 Scenario 10, Test 2 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 72
Figure 52 Scenario 10, Test 2 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 73 Figure 53 Scenario 10, Test 3 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 73
Figure 54 Scenario 10, Test 3 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 74 Figure 55 Before (left) and after (right) photographs of Scenario 11, Tests 1 (top), 2 (middle)
and 3 (bottom)..................................................................................................................... 75
Figure 56 Scenario 11, Test 1 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 76
Figure 57 Scenario 11, Test 1 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 77
Figure 58 Scenario 11, Test 2 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 77
Figure 59 Scenario 11, Test 2 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 78 Figure 60 Scenario 11, Test 3 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 78
Figure 61 Scenario 11, Test 3 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 79 Figure 62 Before (left) and after (right) photographs of Scenario 12, Tests 1 (top), 2 (middle)
and 3 (bottom)..................................................................................................................... 80
Figure 63 Scenario 12, Test 1 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 82
Figure 64 Scenario 12, Test 1 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 82 Figure 65 Scenario 12, Test 2 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 83
Figure 66 Scenario 12, Test 2 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 83 Figure 67 Scenario 12, Test 3 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 84
Figure 68 Scenario 12, Test 3 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 84 Figure 69 Before (left) and after (right) photographs of Scenario 13, Tests 1 (top), 2 (middle)
and 3 (bottom)..................................................................................................................... 86
Figure 70 Scenario 13, Test 1 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 88
Figure 71 Scenario 13, Test 1 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 88
Figure 72 Scenario 13, Test 2 smoke alarm activation times by type in comparison with
calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 89
Figure 73 Scenario 13, Test 2 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 89 Figure 74 Scenario 13, Test 3 smoke alarm activation times by type in comparison with
calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 90
Figure 75 Scenario 13, Test 3 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 90 Figure 76 Before (left) and after (right) photographs of Scenario 14a, Tests 1 (top), 2
(middle) and 3 (bottom). ...................................................................................................... 92
Figure 77 Scenario 14a, Test 1 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 93
Figure 78 Scenario 14a, Test 1 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 94 Figure 79 Scenario 14a, Test 2 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 94
Figure 80 Scenario 14a, Test 2 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 95 Figure 81 Scenario 14a, Test 3 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 95
Figure 82 Scenario 14a, Test 3 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 96 Figure 83 Before (left) and after (right) photographs of Scenario 14b, Tests 1 (top), 2
(middle) and 3 (bottom). ...................................................................................................... 97
Figure 84 Scenario 14b, Test 1 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
........................................................................................................................................... 99
Figure 85 Scenario 14b, Test 1 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. .. 99
Figure 86 Scenario 14b, Test 2 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 100
Figure 87 Scenario 14b, Test 2 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 100 Figure 88 Scenario 14b, Test 3 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 101
Figure 89 Scenario 14b, Test 3 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 101 Figure 90 Before (left) and after (right) photographs of Scenario 15, Tests 1 (top), 2 (middle)
and 3 (bottom)................................................................................................................... 103
Figure 91 Scenario 15, Test 1 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 105
Figure 92 Scenario 15, Test 1 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 105 Figure 93 Scenario 15, Test 2 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 106
Figure 94 Scenario 15, Test 2 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 106 Figure 95 Scenario 15, Test 3 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 107
Figure 96 Scenario 15, Test 3 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 107 Figure 97 Before (left) and after (right) photographs of Scenario 16, Tests 1 (top), 2 (middle)
and 3 (bottom)................................................................................................................... 109
Figure 98 Scenario 16, Test 1 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 111
Figure 99 Scenario 16, Test 1 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 111
Figure 100 Scenario 16, Test 2 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 112
Figure 101 Scenario 16, Test 2 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 112 Figure 102 Scenario 16, Test 3 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 113
Figure 103 Scenario 16, Test 3 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 113 Figure 104 Before (left) and during (right) photographs of Scenario 17, Tests 1 (top), 2
(middle) and 3 (bottom). .................................................................................................... 115
Figure 105 Scenario 17, Test 1 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 117
Figure 106 Scenario 17, Test 1 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 117 Figure 107 Scenario 17, Test 2 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 118
Figure 108 Scenario 317, Test 2 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 118 Figure 109 Scenario 17, Test 3 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 119
Figure 110 Scenario 17, Test 3 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 119
Figure 111 Images of Scenario 18, Tests 1 (top), 2 (middle) and 3 (bottom). .................... 121
Figure 112 Scenario 18, Test 1 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 123
Figure 113 Scenario 18, Test 1 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 123
Figure 114 Scenario 18, Test 2 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 124
Figure 115 Scenario 18, Test 2 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 124 Figure 116 Scenario 18, Test 3 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 125
Figure 117 Scenario 18, Test 3 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 125 Figure 118 Before (left) and after (right) photographs of Scenario 19, Tests 1 (top), 2
(middle) and 3 (bottom). .................................................................................................... 127
Figure 119 Scenario 19, Test 1 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 129
Figure 120 Scenario 19, Test 1 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 129 Figure 121 Scenario 19, Test 2 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 130
Figure 122 Scenario 317, Test 2 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 130 Figure 123 Scenario 19, Test 3 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 131
Figure 124 Scenario 19, Test 3 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 131 Figure 125 Before (left) and after (right) photographs of Scenario 3, Tests 1 (top), 2 (middle)
and 3 (bottom)................................................................................................................... 133
Figure 126 Scenario 20, Test 1 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 135
Figure 127 Scenario 20, Test 1 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 135
Figure 128 Scenario 20, Test 2 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 136
Figure 129 Scenario 317, Test 2 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 136 Figure 130 Scenario 20, Test 3 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 137
Figure 131 Scenario 20, Test 3 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 137
Figure 132 Images of Scenario 22, Tests 1 (top), 2 (middle) and 3 (bottom). .................... 139
Figure 133 Scenario 22, Test 1 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 141
Figure 134 Scenario 22, Test 1 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 141 Figure 135 Scenario 22, Test 2 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 142
Figure 136 Scenario 22, Test 2 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 142 Figure 137 Scenario 22, Test 3 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 143
Figure 138 Scenario 22, Test 3 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 143
Figure 139 Images of Scenario 23, Tests 1 (top), 2 (middle) and 3 (bottom). .................... 145
Figure 140 Scenario 23, Test 1 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 147
Figure 141 Scenario 23, Test 1 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 147 Figure 142 Scenario 23, Test 2 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 148
Figure 143 Scenario 23, Test 2 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 148 Figure 144 Scenario 23, Test 3 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 149
Figure 145 Scenario 23, Test 3 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 149
Figure 146 Images of Scenario 24, Tests 1 (top), 2 (middle) and 3 (bottom). .................... 151
Figure 147 Scenario 24, Test 1 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 153
Figure 148 Scenario 24, Test 1 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 153 Figure 149 Scenario 24, Test 2 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 154
Figure 150 Scenario 24, Test 2 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 154 Figure 151 Scenario 24, Test 3 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 155
Figure 152 Scenario 24, Test 3 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 155
Figure 153 Images of Scenario 25, Tests 1 (top), 2 (middle) and 3 (bottom). .................... 157
Figure 154 Scenario 25, Test 1 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 159
Figure 155 Scenario 25, Test 1 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 159 Figure 156 Scenario 25, Test 2 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 160
Figure 157 Scenario 25, Test 2 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 160
Figure 158 Scenario 25, Test 3 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 161
Figure 159 Scenario 25, Test 3 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 161
Figure 160 Images of Scenario 26, Tests 1 (top), 2 (middle) and 3 (bottom). .................... 163
Figure 161 Scenario 26, Test 1 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 165
Figure 162 Scenario 26, Test 1 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 165 Figure 163 Scenario 26, Test 2 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 166
Figure 164 Scenario 26, Test 2 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 166 Figure 165 Scenario 26, Test 3 smoke alarm activation times by type in comparison with
calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
......................................................................................................................................... 167
Figure 166 Scenario 26, Test 3 smoke alarm activation times by type in comparison with
calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. 167
Figure 167 Scenario 27 set up and result (Test 1) ............................................................. 169
Figure 168 Scenario 28 set up .......................................................................................... 170
Figure 169 Scenario 29 set up .......................................................................................... 171
Figure 170 Scenario 30 set up .......................................................................................... 172
List of Tables
Table 1 Test scenarios suggested by Novozhilov et al., (2015) [* denotes scenarios excluded
in Stage 2] ........................................................................................................................... 27
Table 2 Stage 2 Test scenarios and configurations ............................................................. 28
Table 3 Scenario 1 smoke alarm activation times (min:sec). Empty cells indicate nonactivations. .......................................................................................................................... 34
Table 4 Scenario 1 Time after ignition (min:sec) at which tenability limits were reached 1.5
metres ................................................................................................................................. 36
Table 5 Scenario 1 Available Safe Egress Times (ASETs) in minutes for individual smoke
alarms according to Bedroom 1 tenability limits. Note: ASET≤0 is no ASET, 0 insufficient, ASET≥2.25 is sufficient. ................................................................................... 40 Table 6 Scenario 1 atmospheric conditions ......................................................................... 40 Table 7 Scenario 2 smoke alarm activation times (min:sec) ................................................ 42 Table 8 Scenario 2 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres ................................................................................................................................. 42 Table 9 Scenario 2 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Bedroom 2 tenability limits. Note: ASET≤0 is no ASET, 0 insufficient, ASET≥2.25 is sufficient. ................................................................................... 46 Table 10 Scenario 2 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0 insufficient, ASET≥2.25 is sufficient. ................................................................................... 46 Table 11 Scenario 2 atmospheric conditions ....................................................................... 46 Table 12 Scenario 3 smoke alarm activation times (min:sec) .............................................. 48 Table 13 Scenario 3 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres ................................................................................................................................. 48 Table 14 Scenario 3 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0 insufficient, ASET≥2.25 is sufficient. ................................................................................... 52 Table 15 Scenario 3 atmospheric conditions ....................................................................... 52 Table 16 Scenario 5 smoke alarm activation times (min:sec) .............................................. 54 Table 17 Scenario 5 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres ................................................................................................................................. 54 Table 18 Scenario 5 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Bedroom 2 tenability limits. Note: ASET≤0 is no ASET, 0 insufficient, ASET≥2.25 is sufficient. ................................................................................... 58 Table 19 Scenario 5 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0 insufficient, ASET≥2.25 is sufficient. ................................................................................... 58 Table 20 Scenario 5 atmospheric conditions ....................................................................... 58 Table 21 Scenario 7a smoke alarm activation times (min:sec) ............................................ 60 Table 22 Scenario 7a Time after ignition (min:sec) at which tenability limits were reached 1.5 metres ................................................................................................................................. 60 Table 23 Scenario 7a Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Bedroom 1 tenability limits. Note: ASET≤0 is no ASET, 0 insufficient, ASET≥2.25 is sufficient. ................................................................................... 64 Table 24 Scenario 7a atmospheric conditions ..................................................................... 64 Table 25 Scenario 7b smoke alarm activation times (min:sec) ............................................ 66 Table 26 Scenario 7b Time after ignition (min:sec) at which tenability limits were reached 1.5 metres ................................................................................................................................. 66 Table 27 Scenario 7b Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Bedroom 1 tenability limits. Note: ASET≤0 is no ASET, 0 insufficient, ASET≥2.25 is sufficient. ................................................................................... 69 Table 28 Scenario 7b atmospheric conditions ..................................................................... 69 Table 29 Scenario 10 smoke alarm activation times (min:sec) ............................................ 71 Table 30 Scenario 10 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres ................................................................................................................................. 71 Table 31 Scenario 10 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Bedroom 1 tenability limits. Note: ASET≤0 is no ASET, 0 insufficient, ASET≥2.25 is sufficient. ................................................................................... 74 Table 32 Scenario 10 atmospheric conditions ..................................................................... 74 Table 33 Scenario 11 smoke alarm activation times (min:sec) ............................................ 76 Table 34 Scenario 11 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres ................................................................................................................................. 76 Table 35 Scenario 11 atmospheric conditions ..................................................................... 79 Table 36 Scenario 12 smoke alarm activation times (min:sec) ............................................ 81 Table 37 Scenario 12 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres ................................................................................................................................. 81 Table 38 Scenario 12 atmospheric conditions ..................................................................... 85 Table 39 Scenario 13 smoke alarm activation times (min:sec) ............................................ 87 Table 40 Scenario 13 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres ................................................................................................................................. 87 Table 41 Scenario 13 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0 insufficient, ASET≥2.25 is sufficient. ................................................................................... 91 Table 42 Scenario 13 atmospheric conditions ..................................................................... 91 Table 43 Scenario 14a smoke alarm activation times (min:sec) .......................................... 93 Table 44 Scenario 14a Time after ignition (min:sec) at which tenability limits were reached Table 45 Scenario 14a Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0 Table 46 Scenario 14a atmospheric conditions ................................................................... 96 Table 47 Scenario 14b smoke alarm activation times (min:sec) .......................................... 98 Table 48 Scenario 14b Time after ignition (min:sec) at which tenability limits were reached Table 49 Scenario 14b Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0 Table 50 Scenario 14b atmospheric conditions ................................................................. 102 Table 51 Scenario 15 smoke alarm activation times (min:sec) .......................................... 104 Table 52 Scenario 15 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres ............................................................................................................................... 104 Table 53 Scenario 15 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0 insufficient, ASET≥2.25 is sufficient. ................................................................................. 108 Table 54 Scenario 15 atmospheric conditions ................................................................... 108 Table 55 Scenario 16 smoke alarm activation times (min:sec) .......................................... 110 Table 56 Scenario 16 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres ............................................................................................................................... 110 Table 57 Scenario 16 atmospheric conditions ................................................................... 114 Table 58 Scenario 17 smoke alarm activation times (min:sec) in the Hallway and Lounge room ................................................................................................................................. 116 Table 59 Scenario 17 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres ............................................................................................................................... 116 Table 60 Scenario 17 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0 insufficient, ASET≥2.25 is sufficient. ROO alarms in this scenario were the lounge room alarms which were nearest to the kitchen. ......................................................................... 120 Table 61 Scenario 17 atmospheric conditions ................................................................... 120 Table 62 Scenario 18 smoke alarm activation times (min:sec) in the Hallway and Lounge room ................................................................................................................................. 122 Table 63 Scenario 18 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres ............................................................................................................................... 122 Table 64 Scenario 18 atmospheric conditions ................................................................... 126 Table 65 Scenario 19 smoke alarm activation times (min:sec) in the Hallway and Lounge room. ................................................................................................................................ 128 Table 66 Scenario 19 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres ............................................................................................................................... 128 Table 67 Scenario 19 atmospheric conditions ................................................................... 132 Table 68 Scenario 20 smoke alarm activation times (min:sec) in the Hallway and Lounge room. ................................................................................................................................ 134 Table 69 Scenario 20 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres ............................................................................................................................... 134 Table 70 Scenario 20 atmospheric conditions ................................................................... 138 Table 71 Scenario 22 smoke alarm activation times (min:sec) .......................................... 140 Table 72 Scenario 22 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres ............................................................................................................................... 140 Table 73 Scenario 22 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0 insufficient, ASET≥2.25 is sufficient. ................................................................................. 144 Table 74 Scenario 22 atmospheric conditions ................................................................... 144 Table 75 Scenario 23 smoke alarm activation times (min:sec) .......................................... 146 Table 76 Scenario 23 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres ............................................................................................................................... 146 Table 77 Scenario 23 atmospheric conditions ................................................................... 150 Table 78 Scenario 24 smoke alarm activation times (min:sec) in the Hallway and Bedroom 2 ......................................................................................................................................... 152 Table 79 Scenario 24 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres ............................................................................................................................... 152 Table 80 Scenario 24 atmospheric conditions ................................................................... 156 Table 81 Scenario 25 smoke alarm activation times (min:sec) in the Hallway and Lounge room ................................................................................................................................. 158 Table 82 Scenario 25 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres ............................................................................................................................... 158 Table 83 Scenario 25 atmospheric conditions ................................................................... 162 Table 84 Scenario 26 smoke alarm activation times (min:sec) in the Hallway and Lounge room ................................................................................................................................. 164 Table 85 Scenario 26 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres ............................................................................................................................... 164 Table 86 Scenario 26 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0 insufficient, ASET≥2.25 is sufficient. ................................................................................. 168 Table 87 Scenario 26 atmospheric conditions ................................................................... 168 Table 88 Scenario 27 smoke alarm activation times (min:sec) .......................................... 169 Table 89 Scenario 27 atmospheric conditions ................................................................... 169 Table 90 Scenario 28 smoke alarm activation times (min:sec) .......................................... 170 Table 91 Scenario 28 atmospheric conditions ................................................................... 170 Table 92 Scenario 29 atmospheric conditions ................................................................... 171 Table 93 Scenario 30 smoke alarm activation times (min:sec) .......................................... 172 Table 94 Scenario 30 atmospheric conditions ................................................................... 172 Table 95 Smoke alarm non-activation (rate) by alarm type ............................................... 175 Table 96 Smoke alarm ASET before tenability limit is reached in the Bedroom................. 178 Table 97 Smoke alarm ASET before tenability limit is reached in the Hallway .................. 178 Modern day furnishings and building materials used in homes have dramatically changed the dynamics of residential fires. The combustion of widely used synthetic materials produces faster fires with higher levels of heat and toxic smoke than natural materials, leading to significantly decreased tenability windows for the safe egress of residents. Functional smoke alarms remain the primary means of alerting occupants to fires; however, questions arise as to their effectiveness in the modern home and whether the type and location of smoke alarms play a role. In 2014, FRNSW commenced a research project to assess the effectiveness of photoelectric and ionisation alarms. The project, conducted by the Fire Investigation & Research Unit (FIRU), sought to assess any differences in performance between photoelectric and ionisation smoke alarms in their responses to smouldering and flaming fires. This research also examined the impact of smoke alarm location and the number of alarms in a dwelling on providing timely notification to occupants. A key focus of the research was assessing whether smoke alarms provided adequate notification to allow occupants to exit a dwelling before tenability limits for temperature and toxic gases were reached. The research commenced with a comprehensive literature review and analysis of FRNSW incident data for the preceding 15 years. During 2015 an initial series of 10 research burns were conducted in a full scale replica residence built at the FIRU Fire Research Facility at Londonderry, NSW. Following analysis of the test data a draft report (Engelsman, 2015) was produced which identified that ionisation alarms were inferior to photoelectric and dual-type sensors in most fire scenarios, and that current smoke alarms failed to provide sufficient notification for safe egress when located only in the Hallway as required under current legislation. In response to the report, the Australian Building Codes Board (ABCB) commissioned a critical review of the FRNSW research and other existing literature by the Centre for Environmental and Risk Engineering at Victoria University (Novozhilov et al., 2015). The review identified that the FRNSW smoke alarm research was based on too few tests, did not consider an adequate range of fire scenarios, and that the ignition methods were not representative of real scenarios. Based on the valuable feedback from the ABCBcommissioned review (Novozhilov et al., 2015), FRNSW organised a further series of research burns based on the scenarios suggested by (Novozhilov et al., 2015) (see Table 1). Fire research report – Smoke Alarms in Homes: Stage 2 Page 26 This document details the methodology used in the testing, the results and provides and analysis of the findings. A test burn cell was purpose-built at the FRNSW Research Facility at Londonderry, NSW for the Stage 1 testing in 2015 (Engelsman, 2015). The structure was set up as a two bedroom unit with a layout as illustrated in Figure 1 below for Stage 2 testing. 〔图〕HALLWAYGas Probe 2STOREO00TbTcLOUNGE ROOMdeskwardrobeBATHROOMofqe) 0oy,O0/LAUNDRYBEDROOM 2BEDROOM 1tablescocssssscsstabl The frame of the residence was built from radiata pine with 16 mm fire resistant plasterboard panels lining the internal walls and ceiling. The outside of the building was lined with extra heavy duty premium wall wrap and clad with 7.5 mm plywood. The structure contains a solid timber front door and hollow core lightweight internal doors. Aluminium, glazed sliding windows were installed, ceiling heights were 2.4 m and bulkheads above doors were set at 2.1 m. The structure was roofed with a trim deck metal roof to prevent weathering. Modern furniture and furnishings were purchased to furnish the rooms. The kitchen area was constructed from 4.5mm fibre reinforced cement sheeting for durability during testing. All rooms were carpeted with polypropylene carpet squares, except the kitchen and bathroom spaces, which were fitted with a vinyl floor covering. Document ID: Version A Issued: 10 Dec 2017 Fire research report – Smoke Alarms in Homes: Stage 2 Page 27 Document ID: Version A Issued: 10 Dec 2017 Fire research report – Smoke Alarms in Homes: Stage 2 Page 28 In consultation with the ABCB, 25 test scenarios were selected from the 30 test scenarios suggested by Novozhilov et al. (2015) to be included in the Stage 2 test series. Scenarios 4, 6, 8, 9 and 21 were discarded to avoid repetition. A further two scenarios (7b and 14b) were included to investigate cigarettes as an ignition source in smouldering fires. The final test matrix, which includes a total of 27 scenarios, is presented in Table 2 below. Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 29 Smouldering fires were initiated using a 60W, 240V soldering station (ESD Safe) with temperature control (160°C to 480°C). The soldering pencil was used with the conical tip removed exposing a 30 mm long, 8 mm diameter wide heated tube, pictured in Figure 2 below. Three 15 cm x 15 cm squares of 100% pure cotton batting (or wadding) were used to support sustained smouldering in all tests. Smouldering ignition was achieved with the soldering station set to 350°C and left in contact with the batting for six minutes. The test start time was recorded as the time at which the soldering iron is first in contact with the batting material. 〔图〕插图 Two smouldering test scenarios (7 and 14) were repeated using cigarettes as the ignition source. A single cigarette was lit using a butane-lighter and placed into position on three squares of cotton batting as in the soldering iron tests. The cigarettes were not removed during these tests and were allowed to burn until they self-extinguished (typically around 10-12 minutes duration). A lit cigarette has a heat output typically in the range of 4 to 6W when it is not actively being puffed and a tip temperature of 630-690°C when placed horizontally on an insulating surface (Babrauskas, V., 2003). The thermal energy transferred from a lit cigarette smouldering for 12 minutes can be estimated by the power output multiplied by the contact time to be 2.9-4.3 kJ. In comparison, the soldering iron set at 350°C (~72% power) for six minutes, with ~20% of its surface area in contact with the batting material is transferring approximately 3.1 kJ. The results of the comparison tests were very similar in terms of resulting damage, which indicates that the ignition sources were similar in energy (see Sections 3.5, 3.6, 3.11, and 3.12). Document ID: Version A Issued: 10 Dec 2017 Fire research report – Smoke Alarms in Homes: Stage 2 Page 30 Flaming fires were initiated using a butane barbecue lighter. The flame was held to the test material for approximately 15 seconds. The test start time was recorded at the start of ignition. 〔图〕插图 Forty-eight battery-powered, AS 3786-1993-compliant, smoke alarms were installed in 12 locations throughout the unit. These included one photoelectric, one ionisation, one dual (photoelectric and ionisation) and one multi-criteria (photoelectric and heat sensing) alarm at every location. Alarms were installed in three positions: on the ceiling, wall and in dead space positions as defined in the Building Code of Australia Part 3.7.2.2 Requirements for Smoke Alarms (Australian Building Codes Board, 2016) (Figure 4). A total of 476 smoke alarm samples were modified to supply a voltage output to a data logger on activation. This was achieved either by connecting to the LED indicator, the sounder, or the interconnect circuitry of the alarms (see Figure 5). All samples were verified for Directional Dependence and Initial Sensitivity in accordance with AS 3786 - 2014 (Standards Australia, 2014) at the CSIRO Fire Systems and Acoustics department in Clayton, Victoria prior to testing, with all except one alarm meeting the requirements (See Fire research report – Smoke Alarms in Homes: Stage 2 Page 31 APPENDIX C CSIRO Smoke Alarm Verification Test Reports). One alarm (P111) was excluded from the sensitivity testing due to sounding errors and was subsequently excluded from the test series. 〔图〕Key1500□Dead air space500mmmm maxminSuitable smokealarm locationCeiling line300 mm300 mmmin500 mm maxExposed floor joist 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Internal temperatures were measured via 24 N type thermocouples (measurement range - 270°C to 1260°C), installed at six locations throughout the unit at heights of 0.5 m, 1 m, 1.5 m and 2.3 m from the floor. Ambient test conditions were monitored via a weather station (Vaisala Weather Transmitter WXT520) positioned outside the unit, measuring air temperature, air velocity, relative humidity and air pressure. Alarm activations and conditions were captured via a data acquisition system (DataTaker DT80) sampling at 12 channels per second. Eight infrared digital video cameras were installed throughout the unit to provide video footage of the tests. In addition, a portable digital camera in a protective casing was used to provide close-up views of the fires. Two Gasmet DX4000 units were used to monitor and analyse the gas levels within the fire compartments. A library of 41 gases, including CO, HCN, CO2, O2, HCl, HBr, HF, SO2, NO2, acrolein and formaldehyde, was included in the analyses which utilises Fourier Transform Infrared (FTIR) spectroscopy. The full list of gases and tenability limits used in the calculations is listed in APPENDIX B Tenability Criteria. Two high temperature sampling probes were placed at a height of 1.5 metres at two locations within the unit: one in the Hallway along the path of egress and the other in one of the two bedrooms (in Bedroom 2 when it was the room of origin and in Bedroom 1 otherwise). Gases were sampled every five seconds. The residence was thoroughly ventilated and background tested between each test to enable a clean air environment as the baseline. Smoke alarms were checked following each test for evidence of damage or sounding, and replaced if it was deemed necessary due to low battery or any visual build-up of residue. The data acquired were processed using Microsoft Excel 2010. Tenability limits due to irritant and asphyxiant gases were calculated using the formulae presented by Engelsman (2015). The effective concentrations for the irritant gases used in the calculations are detailed in APPENDIX B Tenability Criteria. All statistical analyses were conducted using IBM SPSS Statistics for Windows, Version 21.0 (Released 2012, IBM Corp., Armonk, NY). The statistical significance level alpha, α was set at 0.05. Although this study was limited due to time and cost considerations, care has been taken to design a robust program of tests which were repeatable and representative of typical fires occurring in residential units in NSW. The configurations of the scenarios were limited due to the construction of the residence, i.e. layout, room sizes, location of openings, ceiling heights and cornice design, surface finishes, furnishings, etc. The smoke alarm positions were limited to three locations per room, which included the ceiling, wall and dead space and were chosen for practicality. Furnishings were bought from bulk retailers for consistency, price and availability, and were the minimum required to realistically furnish each room for every test. The fires were contained at the conclusion each test to limit the damage to the structure and furnishings. Weather and ambient conditions were a factor in the testing. The testing was undertaken in North-Western Sydney in late Autumn-early Winter, where temperatures varied throughout the day ranging from 5°C in the early morning to 20°C in the middle of the day. Obscuration, radiant heat flux, mass loss, and audibility were not measured in this series. The 81 tests were completed over a six-week period between May and June 2016. These included three tests each of the 27 fire scenarios. The results of each test scenario are presented below. In this scenario, a smouldering fire was initiated on the bed using the soldering iron heated to 350°C. The element was left in contact with three cotton batting sheets placed on the polyester quilt for six minutes and then removed. Firefighters then exited the room, closing the bedroom door behind them. It was found that in all three tests, the bedding continued to smoulder for over 20 minutes but none of the smoke alarms in the Hallway outside of Bedroom 1 activated during this period. In Test 1, the smoulder continued for 30 minutes before transitioning to a flaming fire once Fire research report – Smoke Alarms in Homes: Stage 2 Page 34 the foam mattress had burnt through. The alarms positioned outside of Bedroom 1 all activated after the door was opened to extinguish the blaze. Table 3 below summarises the smoke alarm activation times in the room of origin and hallway by alarm type and position for each test. 〔图〕TES7 NUMBEASA0-OVSA012VSA0\n Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 35 Figures 5 – 10 show a comparison of smoke alarm activations with the calculated fractional effective concentrations (FEC) for impaired escape and incapacitation, and fractional effective dose (FED) for asphyxiation (death). The irritant gases contributing to escape impairment and incapacitation in Bedroom 1 included significant amounts of acrolein (up to 29 ppm), formaldehyde (up to 16 ppm), phenol (up to 17 pm), acetaldehyde (up to 66 ppm), and nitrogen dioxide (up to 17 ppm). Note the effective concentrations for escape impairment and incapacitation for these irritants are tabulated in Fire research report – Smoke Alarms in Homes: Stage 2 Page 36 APPENDIX B Tenability Criteria. 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Fire research report – Smoke Alarms in Homes: Stage 2 Page 37 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 38 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 39 〔图〕插图 The tenability limit for irritant induced incapacitation (FEC INCAPACITATION 0.3) is reached in Bedroom 1 in all three tests. The data shows that none of the Hallway-mounted smoke alarms gave adequate, if any, notification. In Test 1, the first Bedroom 1 alarm to activate did so at 10 min 50 sec into the test, which provides an available safe egress time (ASET) of only 19 seconds. All room alarms activated within the next six minutes. The gas analysis revealed that in this time, a room occupant would likely have an impaired ability to escape and possibly would have been incapacitated had they inhaled the gases sampled at 1.5 metres. In Test 2, most ROO alarms provided sufficient ASETs (above 135 seconds or 2.25 minutes). In Test 3, the ROO alarms gave ASETs of at least 4 minutes and 7 seconds. Fire research report – Smoke Alarms in Homes: Stage 2 Page 40 While care is taken to repeat each scenario using the same materials and ignition source, the atmospheric conditions may affect the results. In this scenario, the drier atmospheric conditions in Test 1 may have attributed to the extended duration of the smoulder and consequently the transition to flame. Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 41 In this scenario, a smouldering fire was initiated on the bed using the soldering iron heated to 350°C. The element was left in contact with three cotton batting sheets placed on the mattress between the pillow and quilt for six minutes and then removed. Firefighters then exited the room leaving the bedroom door open. The test was ended after 45 minutes at which time the smoulder had self-extinguished. 〔图〕N\n Fire research report – Smoke Alarms in Homes: Stage 2 Page 42 The irritant gases contributing to escape impairment and incapacitation in Bedroom 2 included acrolein (up to 13.8 ppm), formaldehyde (up to 6.8 ppm), and phenol (up to 4.2 ppm). Document ID: Version A Issued: 10 Dec 2017 Fire research report – Smoke Alarms in Homes: Stage 2 Page 43 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 44 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 45 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 46 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 47 In this scenario, a smouldering fire was initiated on the lounge in the crevice between the armrest and the seat cushion using the soldering iron heated to 350°C. The element was left in contact with three cotton batting sheets for six minutes and then removed. Firefighters then exited the building. The door to Bedroom 2 is closed during the test. The test was ended after 30 minutes at which time the smoulder had self-extinguished. 〔图〕TEUVS\n
〔图〕插图
〔图〕-S0VE\n
〔图〕插图
〔图〕TEST NUSEREE0S\n
〔图〕插图 Fire research report – Smoke Alarms in Homes: Stage 2 Page 48 The irritant gases contributing to escape impairment and incapacitation in the Hallway included acrolein (up to 7.2 ppm), formaldehyde (up to 3 ppm), phenol (up to 4.7 ppm) and nitrogen dioxide (up to 8.5 ppm). Note that none of the alarms in Bedroom 2 were activated during the three tests. Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 49 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 50 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 51 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 52 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 53 In this scenario, a flaming fire was initiated on the polyester bed quilt using a butane barbeque lighter. The flame is left in contact with the quilt edge for 15 seconds and then removed. The fire was extinguished after 2-3 minutes. The irritant gases contributing to escape impairment and incapacitation in Bedroom 2 included acrolein (up to 10.5 ppm), formaldehyde (up to 3.5 ppm), nitrogen dioxide (up to 28.5 ppm), phenol (up to 5 ppm) and sulfur dioxide (up to 3.5 ppm). The peak temperature measured in Bedroom 2 was 93.7°C at ceiling height, and 78.4°C at bed height. In this test, a dry sprinkler head was included in Bedroom 2. Video analysis showed that the sprinkler head cover released at a ceiling temperature between 52.2 and 63.4°C. 〔图〕SA0535\n Fire research report – Smoke Alarms in Homes: Stage 2 Page 54 The tenability limit for irritant induced incapacitation is reached in Bedroom 2 in Tests 1 and 3 and in the Hallway in Test 1 only. The data shows that the presence of any ROO alarm would alert occupants before the tenability threshold is reached in the Hallway in Test 1, and provide a minimum of 2m25s for safe egress (up to 3m18s). For Hallway alarms, the ASET ranges between 2m5s and 2m31s. Fire research report – Smoke Alarms in Homes: Stage 2 Page 55 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 56 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 57 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 58 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 59 In this scenario, a smouldering fire was initiated on the bed using the soldering iron heated to 350°C. The element was left in contact with three cotton batting sheets for six minutes and then removed. Firefighters then exited the room leaving the bedroom door open. The test ended after 30 minutes at which time the smoulder had self-extinguished. 〔图〕SLOVSSLOVSVSSA076OVS\n Fire research report – Smoke Alarms in Homes: Stage 2 Page 60 The main constituents of the irritant gases detected in Bedroom 1 included acrolein (up to 9.1 ppm), and formaldehyde (up to 3.8 ppm). Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 61 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 62 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 63 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 64 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 65 In this scenario, a smouldering fire was initiated on the bed using a lit cigarette. The cigarette was left in contact with three cotton batting sheets for the duration of the test. The test ended after 30 minutes at which time the smoulder had self-extinguished. 〔图〕250VSLAOS0VS131SLOVc\n The main irritant gases detected in Bedroom 1 included acrolein (up to 13.4 ppm), formaldehyde (up to 5.6 ppm) and sulfur dioxide (up to 2.3 ppm). Fire research report – Smoke Alarms in Homes: Stage 2 Page 66 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 67 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 68 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 69 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 70 In this scenario, a flaming fire was initiated on the bed quilt using a butane barbeque lighter. The flame is left in contact with the quilt edge for 15 seconds and then removed. The fire was extinguished after two minutes. 〔图〕sSA1010\n The main constituents of the irritant gases detected in Bedroom 1 included acrolein at 2.9 ppm, 4.7 ppm, and 2.9 ppm in Tests 1, 2 and 3 respectively, and formaldehyde at 2.9 ppm, 4.6 ppm and 1.8 ppm. The peak temperature measured in Bedroom 1 was 100°C at ceiling height (Test 2), and 83.5°C at bed height (Test 3). Fire research report – Smoke Alarms in Homes: Stage 2 Page 71 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 72 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 73 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 74 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 75 In this scenario, a smouldering fire involving an electrical cable was initiated on a stove element. The cable was placed over the element and the test started when the element was switched on to full heat. The test ended at 10-15 minutes. 〔图〕WNSS[TVTT10WN SS123\n The irritant gases detected in the Hallway included significant amounts of acrolein (up to 4.7 ppm), and sulfur dioxide (up to 2.6 ppm), however the tenability limits for occupant incapacitation were not reached during the three tests. Fire research report – Smoke Alarms in Homes: Stage 2 Page 76 〔图〕TEST 1TEST 2TEST 3HallHallHallBed1Bed1Bed100:20FEC IMPAIRED ESCAPE 0.302:21FEC IMPAIRED ESCAPE 1.0FEC INCAPACITATION 0.3 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 77 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 78 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 79 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Fire research report – Smoke Alarms in Homes: Stage 2 Page 80 In this scenario, a flaming fire was initiated in the kitchen involving an electric appliance (a pop-up toaster). The toaster was equipped with a timer cut-out, which prevented the appliance from overheating. In order to initiate a flaming fire, cardboard packing material soaked in 100ml of cooking oil was placed within the toaster as fuel. This caused the appliance to catch in 2m 45s, 2m30s, and 4m35s in Tests 1, 2 and 3, respectively. 〔图〕TIST NMSERSA123TEST NUMBERSA124\n Fire research report – Smoke Alarms in Homes: Stage 2 Page 81 The irritant gases detected in the Hallway included significant amounts of acrolein (up to 3 ppm) and formaldehyde (up to 0.8 ppm); however the tenability limits for occupant incapacitation were not reached during the three tests. The peak temperature measured in the kitchen was 48.8°C at ceiling height (Test 2). Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 82 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 83 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 84 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 85 Fire research report – Smoke Alarms in Homes: Stage 2 Page 86 In this scenario, a flaming fire was initiated on a two-seater lounge using a butane barbeque lighter. The flame was held in contact with the edge of the lounge cushion for 15 seconds before being removed. The fire is extinguished after three to four minutes. 〔图〕5A131ZETVSVS\n Fire research report – Smoke Alarms in Homes: Stage 2 Page 87 The irritant gases detected in the Hallway at 1.5 metres included significant amounts of acrolein (up to 3.6 ppm), formaldehyde (up to 1.8 ppm), nitrogen dioxide (up to 5.7 ppm), nitrogen monoxide (up to 89.4 ppm) and sulfur dioxide (up to 2.8 ppm). The peak temperature measured in the Lounge room was 112°C at ceiling height (Test 3), and 57.8°C at seat height (Test 1). Fire research report – Smoke Alarms in Homes: Stage 2 Page 88 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 89 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 90 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 91 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 92 In this scenario, a smouldering fire was initiated on a two-seater sofa using the soldering iron heated to 350°C. The element was left in contact with three cotton batting sheets for six minutes and then removed. The test ended after 30 minutes at which time the smouldering fires had self-extinguished. 〔图〕3T\n The irritant gases detected in the Hallway included significant amounts of acrolein (up to 6.3 ppm) and formaldehyde (2.4 ppm). Fire research report – Smoke Alarms in Homes: Stage 2 Page 93 〔图〕TEST 1TEST 2TEST 3HalHallHallBed1Bed1Bed109:2403:4412:2804:1313:5010:14FECIMPAIRED ESCAPE 0.323:0215:55FEC IMPAIRED ESCA 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 94 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 95 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 96 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 97 In this scenario, a smouldering fire was initiated on a two-seater sofa using a lit cigarette. The cigarette was left in contact with three cotton batting sheets for the duration of the test. The test ended after 30 minutes at which time the smouldering fires had self-extinguished. 〔图〕44TEST NUMBER1AS\n
〔图〕TEST NUMBER441AS\n
〔图〕-SA1STEST NUMSLRSA146\n
〔图〕TEST NUMBERSA145TEST NUMSERSA146\n Fire research report – Smoke Alarms in Homes: Stage 2 Page 98 The irritant gases detected in the Hallway included significant amounts of acrolein (up to 11.2 ppm) and formaldehyde (up to 2.2 ppm). Fire research report – Smoke Alarms in Homes: Stage 2 Page 99 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 100 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 101 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 102 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 103 In this scenario, a flaming fire was initiated in a waste bin containing 50 sheets of copy paper using the butane barbeque lighter. The flame was left in contact with the paper for 15 seconds and then removed. 〔图〕√Sb\n
〔图〕VSSTEST NUSA155TEST NUMBERSA156\n Fire research report – Smoke Alarms in Homes: Stage 2 Page 104 The irritant gases detected in the Hallway included significant amounts of acrolein (up to 9.60 ppm), formaldehyde (up to 3.2 ppm) and sulfur dioxide (up to 5.1 ppm). The peak temperature measured at the ceiling in the Lounge room was 26.8°C. Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 105 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 106 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 107 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 108 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 109 In this scenario, a flaming fire was initiated on the seat pad of a timber dining chair using a butane barbeque lighter. The flame was held to the seat edge for 15 seconds and then removed. The flaming fire spread across the chair pad until the cushion is consumed and did not spread to the MDF backing or rubber wood frame. The fire self-extinguished in approximately 12 minutes. 〔图〕9S9S备\n Fire research report – Smoke Alarms in Homes: Stage 2 Page 110 The irritant gases detected in the Hallway included significant amounts of acrolein (up to 1.8 ppm), formaldehyde (up to 0.7 ppm) and sulfur dioxide (up to 5.1 ppm). The peak temperature measured at the ceiling in the Lounge room was 26.3°C. The tenability limits for occupant incapacitation were not reached in these tests. Fire research report – Smoke Alarms in Homes: Stage 2 Page 111 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 112 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 113 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 114 Fire research report – Smoke Alarms in Homes: Stage 2 Page 115 In this scenario 250 ml of cooking oil (canola) is heated to flashpoint (+380°C) in a 24 cm frying pan on the stove. Flaming ignition of the cooking oil was achieved at different times for each test using a butane barbeque lighter: Test 1 at 14 minutes when the oil surface temperature was 400°C, Test 2 at 11m20s at 390°C, and Test 3 at 10m40s at 434°C. 〔图〕M0W0N1-工\n
〔图〕插图
〔图〕A\n
〔图〕插图
〔图〕IV\n
〔图〕插图 The majority of smoke alarms activated before the flames ignited (Table 58). Fire research report – Smoke Alarms in Homes: Stage 2 Page 116 The irritant gases detected in the Hallway included significant amounts of acrolein (up to 5.5 ppm), formaldehyde (up to 0.94 ppm), and sulfur dioxide (up to 4.9 ppm). The peak temperature measured in the kitchen was 79°C and in the Lounge room was 66.6°C, both at ceiling height in Test 1. Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 117 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 118 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 119 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 120 Fire research report – Smoke Alarms in Homes: Stage 2 Page 121 In this scenario, a flaming fire was initiated in a cotton tea towel on the kitchen stove using a butane barbeque lighter. The flame was held in contact with the tea towel for 15s and then removed. The tests ended after six to seven minutes. 〔图〕60:S:T 9T02/S0/ISH*8VS\n Fire research report – Smoke Alarms in Homes: Stage 2 Page 122 The irritant gases detected in the Hallway included significant amounts of acrolein (up to 2.9 ppm), and formaldehyde (up to 1.3 ppm). The peak temperature measured in the kitchen was 34.7°C and in the Lounge room was 34.4°C, both at ceiling height in Test 3. The tenability limits for occupant incapacitation in the Hallway at 1.5 metres were not reached in the tests. 〔图〕TEST 1TEST 2TEST 3HallHalHalBed1Bed1Bed1FEC IMPAIRED ESCAPE 0.306:3505:5704:4502:00FEC IMPAIRED ESCAPE 1.0FEC INCAPACITA
Fire research report – Smoke Alarms in Homes: Stage 2 Page 123 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Fire research report – Smoke Alarms in Homes: Stage 2 Page 124 〔图〕插图 〔图〕插图 Document ID: Version A Issued: 10 Dec 2017 Copyright NSW State Government (FRNSW) Figure 116 Scenario 18, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 117 Scenario 18, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. Table 64 Scenario 18 atmospheric conditions Test 1 Test 2 Test 3 Wind Speed (km/h) Air Temp (°C) Rel. Humidity (%) Air Pressure (mbar) In this scenario, a smouldering fire was initiated in the laundry/bathroom using a clothes iron which had been modified to bypass the in-built thermal cut-off. The appliance was switched on high heat and left to heat up on its own. In these three tests, the iron heats for a couple of minutes before self-igniting at 3m30s, 2m35s, and 3m15s in Test 1, 2 and 3, respectively. Figure 118 Before (left) and after (right) photographs of Scenario 19, Tests 1 (top), 2 (middle) and 3 (bottom). Table 65 Scenario 19 smoke alarm activation times (min:sec) in the Hallway and Lounge room. TEST 1 TEST 2 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling #N/A 03:54 03:08 03:22 #N/A 02:35 02:35 02:35 #N/A 02:40 02:20 02:54 Hall Wall 04:01 02:56 03:08 03:35 03:08 02:35 03:02 03:21 03:32 02:40 02:47 03:19 Hall Deadspace 04:07 03:48 04:20 04:26 03:53 03:34 03:15 04:07 03:51 03:06 03:19 03:51 Lounge Ceiling 07:52 04:26 04:20 08:05 04:39 03:47 04:13 05:00 04:37 04:24 05:16 04:57 Lounge Wall 06:35 04:07 04:20 05:17 04:25 04:19 06:30 07:01 04:44 05:29 06:15 Lounge Dead-space 05:26 09:44 05:26 05:49 05:29 05:36 05:29 The irritant gases detected in the Hallway included significant amounts of acrolein (up to 2.3 ppm), formaldehyde (up to 0.73 ppm) and sulfur dioxide (up to 3.7 ppm). The tenability limits for occupant incapacitation were not reached in the tests. Table 66 Scenario 19 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres TEST 1 TEST 2 TEST 3 Bed1 Hall Bed1 Hall Bed1 Hall FEC IMPAIRED ESCAPE 0.3 01:35 03:59 06:55 00:41 FEC IMPAIRED ESCAPE 1.0 FEC INCAPACITATION 0.3 FEC INCAPACITATION 1.0 FED ASPHYXIATION 0.3 FED ASPHYXIATION 1.0 Figure 119 Scenario 19, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 120 Scenario 19, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 121 Scenario 19, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 122 Scenario 317, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 123 Scenario 19, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 124 Scenario 19, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. Table 67 Scenario 19 atmospheric conditions Test 1 Test 2 Test 3 Wind Speed (km/h) Air Temp (°C) Rel. Humidity (%) Air Pressure (mbar) In this scenario, similarly to Scenario 19, a smouldering fire was initiated in the laundry/bathroom using a clothes iron which had been modified to bypass the in-built thermal cut-off. The appliance was switched on high heat and left to heat up on its own and the sliding door to the laundry was shut. In these three tests, the iron heats for a couple of minutes before self-igniting. Figure 125 Before (left) and after (right) photographs of Scenario 3, Tests 1 (top), 2 (middle) and 3 (bottom). Table 68 Scenario 20 smoke alarm activation times (min:sec) in the Hallway and Lounge room. TEST 1 TEST 2 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling 05:54 04:30 04:42 04:36 #N/A #N/A #N/A 16:11 06:10 05:57 06:03 05:57 Hall Wall 05:02 04:42 04:42 04:56 07:38 #N/A 08:17 06:40 06:49 06:49 #N/A 05:50 Hall Deadspace 06:07 06:33 06:19 06:00 #N/A #N/A #N/A #N/A #N/A #N/A 08:04 08:43 Lounge Ceiling #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 09:54 09:54 09:54 Lounge Wall 06:45 #N/A 06:59 06:33 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Lounge Dead-space 07:12 #N/A 07:12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A The irritant gases detected in the Hallway included significant amounts of acrolein (up to 1.1 ppm). The tenability limits for occupant incapacitation were not reached in the tests. Table 69 Scenario 20 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres TEST 1 TEST 2 TEST 3 Bed1 Hall Bed1 Hall Bed1 Hall FEC IMPAIRED ESCAPE 0.3 00:14 02:19 05:32 05:33 FEC IMPAIRED ESCAPE 1.0 FEC INCAPACITATION 0.3 FEC INCAPACITATION 1.0 FED ASPHYXIATION 0.3 FED ASPHYXIATION 1.0 Figure 126 Scenario 20, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 127 Scenario 20, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 128 Scenario 20, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 129 Scenario 317, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 130 Scenario 20, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 131 Scenario 20, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. Table 70 Scenario 20 atmospheric conditions Test 1 Test 2 Test 3 Wind Speed (km/h) Air Temp (°C) Rel. Humidity (%) Air Pressure (mbar) In this scenario, a flaming fire was initiated on a pillow in Bedroom 1 using a butane barbeque lighter. The door to Bedroom 1 was closed throughout the test. The flame was held to the pillow edge for 15 seconds and then removed. Figure 132 Images of Scenario 22, Tests 1 (top), 2 (middle) and 3 (bottom). Table 71 Scenario 22 smoke alarm activation times (min:sec) TEST 1 TEST 2 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling 02:36 02:17 02:29 02:36 02:33 02:13 02:07 02:19 02:32 02:13 02:19 02:19 Hall Wall 02:29 02:23 02:29 02:29 02:19 02:07 02:13 02:26 02:39 02:19 02:32 02:39 Hall Deadspace 02:29 02:10 02:29 02:23 02:19 01:54 02:58 02:07 02:25 02:06 02:39 02:13 ROO Ceiling 01:38 01:25 01:45 01:32 01:03 00:44 01:16 00:56 01:14 00:30 00:36 01:08 ROO Wall 01:38 01:13 01:38 01:38 01:09 00:56 01:22 01:22 01:21 00:49 00:49 01:21 ROO Deadspace 01:38 01:00 00:53 01:38 01:09 00:56 01:03 01:03 00:36 01:02 01:14 The irritant gases detected in the Hallway included significant amounts of acrolein (up to 138°C at the ceiling (Test 2). Table 72 Scenario 22 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres TEST 1 TEST 2 TEST 3 Bed1 Hall Bed1 Hall Bed1 Hall FEC IMPAIRED ESCAPE 0.3 01:32 03:43 00:09 01:13 01:23 06:56 FEC IMPAIRED ESCAPE 1.0 02:13 01:07 01:40 FEC INCAPACITATION 0.3 02:13 01:41 01:40 FEC INCAPACITATION 1.0 FED ASPHYXIATION 0.3 FED ASPHYXIATION 1.0 Figure 133 Scenario 22, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 134 Scenario 22, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 135 Scenario 22, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 136 Scenario 22, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 137 Scenario 22, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 138 Scenario 22, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. Table 73 Scenario 22 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0 TEST 1 TEST 2 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling -0.38 -0.07 -0.27 -0.38 -0.86 -0.53 -0.43 -0.64 -0.86 -0.55 -0.65 -0.65 Hall Wall -0.27 -0.17 -0.27 -0.27 -0.64 -0.43 -0.53 -0.74 -0.98 -0.65 -0.86 -0.98 Hall Deadspace -0.27 0.05 -0.27 -0.17 -0.64 -0.21 -1.28 -0.43 -0.76 -0.43 -0.98 -0.55 ROO Ceiling 0.59 0.79 0.47 0.69 0.63 0.95 0.42 0.75 0.43 1.17 1.07 0.54 ROO Wall 0.59 1.00 0.59 0.59 0.53 0.75 0.32 0.32 0.32 0.85 0.85 0.32 ROO Deadspace 0.59 1.22 1.33 0.59 0.53 0.75 0.63 0.63 #N/A 1.07 0.64 0.43 Table 74 Scenario 22 atmospheric conditions Test 1 Test 2 Test 3 Wind Speed (km/h) Air Temp (°C) Rel. Humidity (%) Air Pressure (mbar) In this scenario, a flaming fire was initiated in a waste bin containing 20 sheets of scrunched copy paper using the butane barbeque lighter. The flame is left in contact with the paper for 15 seconds and then removed. The fires continued to burn for two to three minutes and selfextinguished after all the paper had burned. Figure 139 Images of Scenario 23, Tests 1 (top), 2 (middle) and 3 (bottom). Table 75 Scenario 23 smoke alarm activation times (min:sec) TEST 1 TEST 2 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling #N/A 00:48 01:14 #N/A #N/A 01:08 01:15 #N/A #N/A 01:23 01:16 #N/A Hall Wall #N/A 00:41 01:07 #N/A #N/A 01:08 01:15 #N/A #N/A 01:08 01:16 #N/A Hall Deadspace #N/A 00:41 00:48 #N/A #N/A 01:02 01:15 #N/A #N/A 01:08 01:29 #N/A ROO Ceiling #N/A 00:08 00:28 #N/A #N/A 00:35 00:42 #N/A #N/A 00:35 00:42 #N/A ROO Wall #N/A 00:14 00:41 #N/A #N/A 00:42 00:49 #N/A #N/A 00:35 00:42 #N/A ROO Deadspace #N/A 00:08 00:21 #N/A #N/A 00:42 00:55 00:55 #N/A 00:28 00:42 #N/A The irritant gases detected in the Hallway included significant amounts of acrolein (up to 2.7 ppm) and formaldehyde (1.4 ppm). The tenability limits for occupant incapacitation were not reached in the tests. The temperatures measured in the Hallway peaked at 32.7°C at the ceiling (Test 3), from 19°C at the start of the test. Table 76 Scenario 23 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres TEST 1 TEST 2 TEST 3 ROO Hall ROO Hall ROO Hall FEC IMPAIRED ESCAPE 0.3 00:10 00:26 00:31 03:35 FEC IMPAIRED ESCAPE 1.0 FEC INCAPACITATION 0.3 FEC INCAPACITATION 1.0 FED ASPHYXIATION 0.3 FED ASPHYXIATION 1.0 Figure 140 Scenario 23, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 141 Scenario 23, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 142 Scenario 23, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 143 Scenario 23, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 144 Scenario 23, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 145 Scenario 23, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. Table 77 Scenario 23 atmospheric conditions Test 1 Test 2 Test 3 Wind Speed (km/h) Air Temp (°C) Rel. Humidity (%) Air Pressure (mbar) In this scenario, similarly to Scenario 23, a flaming fire was initiated in a waste bin containing 20 sheets of scrunched copy paper using the butane barbeque lighter. The flame was left in contact with the paper for 15 seconds and then removed. The fires continued to burn for two to three minutes and self-extinguished after all the paper had burned. The door to Bedroom 1 was closed throughout the test. Figure 146 Images of Scenario 24, Tests 1 (top), 2 (middle) and 3 (bottom). Table 78 Scenario 24 smoke alarm activation times (min:sec) in the Hallway and Bedroom 2 TEST 1 TEST 2 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling 01:13 01:20 00:46 01:06 00:47 00:41 Hall Wall 01:07 01:07 00:46 00:46 00:54 00:41 Hall Deadspace 01:07 01:13 00:46 01:06 00:35 00:41 01:00 ROO Ceiling 00:40 01:07 00:19 00:19 00:15 00:28 00:35 ROO Wall 00:40 00:47 00:19 00:38 00:28 00:28 00:47 ROO Deadspace 00:40 00:47 00:13 00:25 00:38 00:47 00:15 00:21 00:28 The irritant gases detected in Bedroom 2 included significant amounts of acrolein (up to 2.4 ppm), formaldehyde (3 ppm) and sulfur dioxide (up to 7.2 ppm). The tenability limits for occupant incapacitation were not reached in the tests. The temperatures measured in Bedroom 2 peaked at 27.9°C, rising from an initial 20°C (Test 2). Table 79 Scenario 24 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres TEST 1 TEST 2 TEST 3 ROO Hall ROO Hall ROO Hall FEC IMPAIRED ESCAPE 0.3 00:39 00:03 03:37 00:04 03:11 FEC IMPAIRED ESCAPE 1.0 FEC INCAPACITATION 0.3 FEC INCAPACITATION 1.0 FED ASPHYXIATION 0.3 FED ASPHYXIATION 1.0 Figure 147 Scenario 24, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 148 Scenario 24, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 149 Scenario 24, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 150 Scenario 24, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 151 Scenario 24, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 152 Scenario 24, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. Table 80 Scenario 24 atmospheric conditions Test 1 Test 2 Test 3 Wind Speed (km/h) Air Temp (°C) Rel. Humidity (%) Air Pressure (mbar) In this scenario, a flaming fire was initiated on the pad of a timber dining chair placed in the Hallway using a butane barbeque lighter. The flame was held in contact with the chair pad for 15 seconds and then removed. The chair pad continued to burn for approximately 12 minutes and self-extinguished when it was fully consumed. The flame did not spread to the MDF backing or the rubber wood chair frame. Figure 153 Images of Scenario 25, Tests 1 (top), 2 (middle) and 3 (bottom). Table 81 Scenario 25 smoke alarm activation times (min:sec) in the Hallway and Lounge room TEST 1 TEST 2 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling Hall Wall Hall Deadspace Lounge Ceiling Lounge Wall Lounge Dead-space 6.88 4.14 4.37 The irritant gases detected in the Hallway included significant amounts of acrolein (up to 1.9 ppm) and formaldehyde (0.8 ppm). The tenability limits for occupant incapacitation were not reached in the tests. The temperatures measured in the Hallway peaked at 29°C at the ceiling from an initial 16.5°C (Test 2). Table 82 Scenario 25 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres TEST 1 TEST 2 TEST 3 Bed1 Hall Bed1 Hall Bed1 Hall FEC IMPAIRED ESCAPE 0.3 02:01 01:07 00:16 FEC IMPAIRED ESCAPE 1.0 FEC INCAPACITATION 0.3 FEC INCAPACITATION 1.0 FED ASPHYXIATION 0.3 FED ASPHYXIATION 1.0 Figure 154 Scenario 25, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 155 Scenario 25, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 156 Scenario 25, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 157 Scenario 25, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 158 Scenario 25, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 159 Scenario 25, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. Table 83 Scenario 25 atmospheric conditions Test 1 Test 2 Test 3 Wind Speed (km/h) Air Temp (°C) Rel. Humidity (%) Air Pressure (mbar) In this scenario, a smouldering fire was initiated on an upholstered chair placed in the Hallway using the soldering iron heated to 350°C. The element was left in contact with three cotton batting sheets for six minutes and then removed. The smoulder continued for some 15 minutes before self-extinguishing. Figure 160 Images of Scenario 26, Tests 1 (top), 2 (middle) and 3 (bottom). Table 84 Scenario 26 smoke alarm activation times (min:sec) in the Hallway and Lounge room TEST 1 TEST 2 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling 05:55 07:08 05:22 05:49 06:13 06:33 06:06 06:00 05:43 06:03 05:30 05:36 Hall Wall 05:15 06:48 05:55 04:49 06:26 06:52 06:06 06:00 05:49 06:03 06:16 05:23 Hall Deadspace 05:49 06:21 05:29 05:42 06:52 07:32 06:26 06:39 06:10 06:29 06:03 06:03 Lounge Ceiling 11:39 08:51 13:24 10:59 15:10 Lounge Wall 11:25 07:15 07:28 06:55 07:53 07:19 07:26 07:32 06:29 06:10 06:29 06:23 Lounge Dead-space 14:36 18:07 13:35 16:20 11:05 11:32 13:04 The irritants detected in the Hallway included significant amounts of acrolein (up to 6.2 ppm) and formaldehyde (up to 3.5 ppm). Table 85 Scenario 26 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres TEST 1 TEST 2 TEST 3 Bed1 Hall Bed1 Hall Bed1 Hall FEC IMPAIRED ESCAPE 0.3 07:04 00:12 08:27 00:23 07:13 01:01 FEC IMPAIRED ESCAPE 1.0 03:52 09:59 10:03 12:47 06:36 FEC INCAPACITATION 0.3 03:52 11:33 06:52 FEC INCAPACITATION 1.0 FED ASPHYXIATION 0.3 FED ASPHYXIATION 1.0 Figure 161 Scenario 26, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 162 Scenario 26, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 163 Scenario 26, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 164 Scenario 26, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 165 Scenario 26, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED. Figure 166 Scenario 26, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED. Table 86 Scenario 26 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0 TEST 1 TEST 2 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling -2.06 -3.27 -1.50 -1.95 5.33 5.01 5.45 5.56 1.15 0.81 1.37 1.26 Hall Wall -1.39 -2.94 -2.06 -0.94 5.11 4.68 5.45 5.56 1.04 0.81 0.59 1.48 Hall Deadspace -1.95 -2.48 -1.61 -1.84 4.68 4.01 5.11 4.90 0.70 0.38 0.81 0.81 Lounge Ceiling #N/A #N/A -7.78 #N/A #N/A #N/A 2.69 #N/A -6.53 #N/A -4.11 -8.30 Lounge Wall -7.56 -3.38 -3.59 -3.05 3.67 4.23 4.12 4.01 0.38 0.70 0.38 0.49 Lounge Dead-space -10.74 #N/A -14.25 #N/A -2.03 #N/A -4.78 #N/A -4.22 #N/A -4.66 -6.20 Table 87 Scenario 26 atmospheric conditions Test 1 Test 2 Test 3 Wind Speed (km/h) Air Temp (°C) Rel. Humidity (%) Air Pressure (mbar) Fire research report -Smoke Alarms in Homes: Stage 2 Fire research report -Smoke Alarms in Homes: Stage 2 In this scenario, four slices of bread were placed in a portable grill in the kitchen and toasted on high heat for approximately 15 minutes. The door of the grill was left ajar to allow any smoke to escape. Smoke alarms activated include ionisation and dual alarms in the Lounge and Hallway and some duals in the bedrooms (Table 88 ). N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Bedroom 1 Ceiling #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Bedroom 1 Wall #N/A #N/A 14.23 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Bedroom 1 Deadspace #N/A #N/A #N/A #N/A #N/A #N/A 14.26 #N/A #N/A #N/A 14.87 #N/A Bedroom 2 Ceiling #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Bedroom 2 Wall #N/A #N/A 15.32 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Bedroom 2 Deadspace #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A References Air Pressure (mbar) In this scenario, a hot water urn was used to generate steam in the bathroom to simulate the steam from a shower. The test began when the sliding door to the bathroom was opened and the steam was released into the Hallway. Figure 168 Scenario 28 set up The only alarms to activate during these tests were the photoelectric alarms in the ceiling position in the hallway. Table 90 Scenario 28 smoke alarm activation times (min:sec) TEST 1 TEST 2 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling 02:54 #N/A #N/A #N/A 03:21 #N/A #N/A #N/A 01:53 #N/A #N/A #N/A Hall Wall Hall Deadspace Lounge Ceiling Lounge Wall Lounge Dead-space Bedroom 1 Ceiling Bedroom 1 Wall Bedroom 1 Deadspace Bedroom 2 Ceiling Bedroom 2 Wall Bedroom 2 Deadspace #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Table 91 Scenario 28 atmospheric conditions Test 1 Test 2 Test 3 Wind Speed (km/h) Air Temp (°C) Rel. Humidity (%) Air Pressure (mbar) In this scenario, two cigarettes are lit and left to smoulder in an ashtray placed on the coffee table in the Lounge. Figure 169 Scenario 29 set up In all tests, the cigarettes continued to smoulder for nine to 12 minutes. No smoke alarms activated in the tests. Table 92 Scenario 29 atmospheric conditions Test 1 Test 2 Test 3 Wind Speed (km/h) Air Temp (°C) Rel. Humidity (%) Air Pressure (mbar) In this scenario, three incense candles are lit and left to burn in a holder placed on the coffee table in the Lounge. Figure 170 Scenario 30 set up Table 93 Scenario 30 smoke alarm activation times (min:sec) TEST 1 TEST 2 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling N/A #N/A Hall Wall Hall Deadspace Lounge Ceiling #N/A #N/A 00:51 #N/A #N/A #N/A #N/A #N/A #N/A 08:27 09:07 #N/A Lounge Wall Lounge Dead-space Bedroom 1 Ceiling Bedroom 1 Wall Bedroom 1 Deadspace Bedroom 2 Ceiling #N/A 07:26 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Bedroom 2 Wall Bedroom 2 Deadspace #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Table 94 Scenario 30 atmospheric conditions Test 1 Test 2 Test 3 Wind Speed (km/h) Air Temp (°C) Rel. Humidity (%) Air Pressure (mbar) In the evaluation of smoke alarm performance, as can be seen from the results presented in Section 3, a multitude of factors may contribute to variations between tests. A nondimensional analysis technique was proposed by Milarcik, Elenick, & Roby (2008) whereby the activation time for a particular smoke detector in a specific test is normalised (or weighted) based on the activation time of the first alarm in that location. This technique eliminates the test-specific variables related to fire type and intensity, fire development, and smoke travel and allows the direct comparison of the detector technologies and sensitivities. Milarcik et al. (2008) compared smoke alarm responses using the Common Language Effect Size (CLES) statistic, which measures the extent of overlap of two population distributions with a continuous dependent variable (normalised activation times). The CLES method assumes that the independent samples follow a normal distribution. For the comparison of non-parametric and dissimilar distributions, as in our case, the Kruskal-Wallis H test can be used to compare mean ranks of normalised activation times across multiple categories (alarm types). Using this method, the technology with the lowest mean rank has the lowest activation time, i.e. is the quickest. When we take into account all 48 of the alarms installed in the unit and a possible 3,888 activations, the Kruskal-Wallis H test showed a statistically significant difference in normalised activation times between the different alarm types, χ2(3) = 336.796, p < .05, with a mean rank of 2254.00 for photoelectric alarms, 1799.79 for ionisation alarms, 1488.39 for dual alarms and 2235.82 for multi alarms. Post-hoc tests revealed significant differences between the dual alarms and ionisation alarms, χ2(1) = 311.406, p < .05, dual and multi alarms, χ2(1) = -747.436, p < .05, dual and photoelectric alarms, χ2(1) = 765.609, p < .05, ionisation and multi alarms, χ2(1) = -436.030, p < .05, and ionisation and photoelectric alarms, χ2(1) = 454.203, p < .05. Excluding the nuisance tests, the Kruskal-Wallis H test on the 3,312 activations showed similar results, with a statistically significant difference in normalised activation times between the different alarm types, χ2(3) = 381.524, p < .05, with a mean rank of 1973.70 for photoelectric alarms, 1499.81 for ionisation alarms, 1210.75 for dual alarms and 1941.74 for multi alarms. Post-hoc tests revealed significant differences between the dual alarms and ionisation alarms, χ2(1) = 289.059, p < .05, dual and multi alarms, χ2(1) = -730.986, p < .05, Fire research report -Smoke Alarms in Homes: Stage 2 Fire research report -Smoke Alarms in Homes: Stage 2 Abstract dual and photoelectric alarms, χ 2 (1) = 762.944, p < .05, ionisation and multi alarms, χ 2 (1) = -441.927, p < .05, and ionisation and photoelectric alarms, χ 2 (1) = 473.885, p < .05. In smouldering tests (1,584 possible activations), the Kruskal-Wallis H test showed a statistically significant difference in normalised activation times between the different alarm types, χ 2 (3) = 207.189, p < .05, with a mean rank of 829.41 for photoelectric alarms, 1,000.00 for ionisation alarms, 548.28 for dual alarms and 792.31 for multi alarms. Post-hoc tests revealed significant differences between the dual alarms and multi alarms, χ 2 (1) = -244.035, p < .05, dual and photoelectric alarms, χ 2 (1) = 281.133, p < .05, dual and ionisation alarms, χ 2 (1) = 451.721, p < .05, multi and ionisation alarms, χ 2 (1) = 207.686, p < .05, and photoelectric and ionisation alarms, χ 2 (1) = -170.588, p < .05. Paired samples t-tests showed significant differences between activation times for five of the six different smoke alarm pairs in smouldering fires. There was a significant difference between activation times for photoelectric alarms (M = 9.55, SD = 6.85) and ionisation alarms (M = 10.05, SD = 6.91); t(179) = -2.585, p < .05, with photoelectric alarms on average 29.9 seconds faster than ionisation alarms. Dual alarms (M = 8.99, SD = 6.51) were significantly faster than ionisation alarms (M = 10.04, SD = 6.95); t( 189 dual alarms (M = 10.85, SD = 7.17) were faster by an average of 47.3 seconds; t(267) = -3.753, p < .05. There were no significant differences between activation times for photoelectric and multi-criteria alarms in smouldering fires. In flaming tests (1,728 possible activations), the Kruskal-Wallis H test showed a statistically significant difference in normalised activation times between the different alarm types, χ 2 (3) = 641.198, p < .05, with a mean rank of 1,154.80 for photoelectric alarms, 484.87 for ionisation alarms, 659.56 for dual alarms and 1158.78 for multi alarms. Post-hoc tests revealed significant differences between the ionisation alarms and dual alarms, χ 2 (1) = -174.686, p < .05, ionisation and photoelectric alarms, χ 2 (1) = 669.926, p < .05, ionisation and References Fire research report -Smoke Alarms in Homes: Stage 2 Fire research report -Smoke Alarms in Homes: Stage 2 Abstract Copyright NSW State Government (FRNSW) multi alarms, χ 2 (1) = -673.911, p < .05, dual and photoelectric alarms, χ 2 (1) = 495.240, p < .05, and dual and multi alarms, χ 2 (1) = -499.225, p < .05. Paired samples t-tests showed significant differences between activation times for four of the six different smoke alarm pairs in flaming fires. There was a significant difference between activation times for photoelectric alarms (M = 4.22, SD = 3.35) and ionisation alarms (M = 3.50, SD = 3.20); t(259) = 9.157, p < .05, with ionisation alarms on average 43.1 seconds faster than photoelectric alarms. Ionisation alarms (M = 3.40, SD = 3.24) were significantly faster than multi-criteria alarms (M = 4.14, SD = 3.42); t(258) = -9.095, p < .05, by an average of 44.8 seconds. Dual alarms (M = 3.50, SD = 2.93) were significantly faster than photoelectric alarms (M = 4.21, SD = 3.36); t(257) = 8.277, p < .05, by an average of 52.9 seconds. Dual alarms (M = 3.38, SD = 2.94) were significantly faster than multi-criteria alarms (M = 4.14, SD = 3.42); t(256) = -8.352, p < .05, by an average of 45.2 seconds. Abstract There were no significant differences between activation times for ionisation and dual alarms, and between photoelectric and multi-criteria alarms in flaming fires. The factor that significantly affected the results of photoelectric and multi-criteria alarms was the non-activations, especially in flaming fires, which were included in the analysis. Nonactivations had been removed by Milarcik et al. (2008) in their study. The flaming fires in this test series were small scale and did not produce enough large smoke particles to trigger the photoelectric sensors. Of a possible 828 ROO alarm activations (nuisance tests excluded), there were 100 (12%) non-activations recorded in the testing. Table 95 below shows the breakdown by alarm type. One-way between subjects ANOVA was conducted to compare non-activations for photoelectric, ionisation, dual and multi alarms. There was a significant difference between non-activation rates for the four alarm types [F(3, 824) = 24.563, p < .05]. Post hoc comparisons using the Tukey HSD test indicated that the photoelectric alarms (24.6%) and References multi alarms (17.4%) had significantly more ROO non-activations than the ionisation (M = Hallway alarms had similar results with 20.5% non-activations and one-way ANOVA also indicating significant differences between the four alarm types [F(3, 824) = 16.989, p < .05]. Post hoc comparisons found that the photoelectric alarms (M = 30.4%, SD = 46.1%) and multi alarms (M = 29.0%, SD = 45.5%) had significantly more Hallway non-activations than the ionisation (M = 15.9%, SD = 36.7%) and dual alarms (M = 6.8%, SD = 25.2%). The nuisance tests found that ionisation alarms and dual alarms were most likely to activate due to nuisance sources, while multi alarms did not activate at all. Of a possible 144 alarm activations in the room of origin, there were 15 (10.4%) activations. One-way ANOVA found a significant difference between activation rates for the four alarm types [F(3, 140) = 3.638, p < .05]. Post hoc comparisons showed that dual alarms had significantly more nuisance activations than multi alarms. Nuisance alarms are a major cause of smoke alarms being deactivated in homes by the occupants (Fazzini, Perkins, & Grossman, 2000). The four nuisance scenarios investigated in this series produced few activations, which were dependent on the source, the vicinity of the alarm, and the atmospheric conditions at the time of the test. Scenario 27, which involved burning toast/sandwiches under a grill, resulted in activation of the ionisation and dual-type alarms located in the Lounge and Hall, and a scattering of dualtype alarms in the Bedrooms. The alarms activated after at least nine minutes of cooking, at which time, while there was little visible smoke, the smell of burnt toast was present. There were no activations of photoelectric or multi-criteria alarms in this Scenario. Scenario 28, which involved steam from the bathroom, produced only activations from the nearest photoelectric alarm at the Hallway ceiling. The activations occurred after the door to the bathroom had been opened for about two or three minutes. Scenario 29 involved smoke from a couple of cigarettes left burning in an ashtray on the coffee table in the Lounge room. While no alarms activated in all three tests, it was observed during trials that activation of alarms did occur when the smoke was able to reach them. Due to the warm outside ambient temperatures, the temperature gradients within the unit (up to of the smoke plume occurs, which prevents smoke from reaching the smoke alarms. It was noted that five of the six cigarettes used continued to burn for their entire lengths, while one stopped at approximately one centimetre from the butt (filter). Note that the mandatory standard for reduced fire risk cigarettes (Trade Practices (Consumer Product Safety Standard)(Reduced Fire Risk Cigarettes) Regulations 2008), which applies to all cigarettes sold in Australia from 23 September 2010, requires that at least 75% of the cigarettes that are tested (in accordance with AS 4830 (Standards Australia, 2007)) in a test trial must fail to achieve full length burns” (ACCC, 2010). In the smouldering tests using a lit cigarette (Scenarios 7b and 14b), all cigarettes used were successful in causing a sustained smoulder when left on a pile of cotton batting. A comparison was made of smoke alarm activation times with the times at which tenability limits were reached in the Bedrooms and the Hallway. The available safe egress time (ASET) is the time between smoke alarm activation and the time at which the calculated fractional effective concentration (FEC) for occupant incapacitation reaches 0.3. The ASET is deemed adequate if it is greater than the required safe egress time (RSET) of 135 seconds. Smouldering fires involved an assortment of materials including cotton, polyester, polypropylene, polyurethane, polyvinyl chloride and polyethylene, which produced smoke containing significant levels of acrolein, formaldehyde, phenol and sulfur dioxide. In the bedroom fires, tenability limits in the ROO were reached typically in around ten to 12 minutes whether the door was open or closed. When tenability limits were reached in the bedroom, it was found that only 35.7% of alarms provided sufficient ASET. When tenability limits were reached in the hallway, 54.8% of alarms provided sufficient. Table 96 and Table 97 below summarise smoke alarm performance in terms of calculated ASETs before Bedroom and Hallway tenability limits are reached. All room of origin and Hallway alarms were included except for those installed in the dead space positions. Table 96 Smoke alarm ASET before tenability limit is reached in the Bedroom PHOTOELECTRIC IONISATION DUAL MULTI Smouldering Flaming Smouldering Flaming Smouldering Flaming Smouldering Flaming Adequate (ASET > RSET) Inadequate (ASET < RSET) None (ASET < 0) Table 97 Smoke alarm ASET before tenability limit is reached in the Hallway PHOTOELECTRIC IONISATION DUAL MULTI Smouldering Flaming Smouldering Flaming Smouldering Flaming Smouldering Flaming Adequate (ASET > RSET) Inadequate (ASET < RSET) None (ASET < 0) Analysis of the levels of toxic gases in the bedrooms and along the path of egress revealed that overall smoke alarm performance was poor in terms of the provision of adequate warning for the safe egress of occupants. This is in agreement with prior research (Engelsman, 2015). In the Bedroom, smoke alarms provided inadequate to no egress time for occupants during flaming fires, and were only adequate in up to 42% of smouldering fires in which the tenability limit was reached. The poor performance of current smoke alarm technologies in terms of toxicity tenability is a cause for concern. The results indicate that current technologies are incapable of providing sufficient warning in flaming fires and require improvement for smouldering fires. There is a need to include in the smoke alarm standards a means to assess performance in terms of available safe egress times. In this comprehensive study on smoke alarm activations in residential fires it was found that of the four alarm types tested, dual photoelectric/ionisation alarms were overall the quickest to activate, while only ionisation alarms activated earlier than dual alarms in fast flaming fires only. Testing revealed that non-activation rates were high for photoelectric and multi-criteria alarms, while ionisation and dual-type alarms were more likely to activate due to nuisance sources such as cooking fumes, cigarette smoke, and burning incense. Analysis of the levels of toxic gases in the bedrooms and along the path of egress revealed that overall smoke alarm performance was poor in terms of the provision of adequate warning for the safe egress of occupants. It was found that often tenability limits were reached in the room of origin before hallway alarms were activated. Hallway alarms did not activate at all when the door to the room of origin was closed. This reinforces the recommendations by FRNSW in Stage 1, that smoke alarms be required in all hallways, bedrooms and living spaces, and should be interconnected (Engelsman, 2015). Smoke alarms are an essential component in a suite of fire safety measures used to protect occupants from residential fires. The results indicate that current technologies are incapable of providing sufficient warning in flaming fires and that there is a need to improve tenability performance of smoke alarms in smouldering fires where smoke alarms have the potential to provide notification for the safe egress of occupants. Considering the findings of the study, FRNSW notes a number of measures that can be implemented to improve fire safety in residential settings: • Smoke alarms required in every living space, bedroom and hallway • All smoke alarms within a residence to be interconnected • Improvement of smoke alarm performance by including toxic tenability performance requirements in the standards, and • The use of automated fire suppression systems (home sprinklers) to be used to mitigate fast flaming fires in residences. ACCC. (2010, November). Reduced fire risk cigarettes: Supplier guide. Australian Competition and Consumer Commission. Retrieved from https://www.accc.gov.au/system/files/Reduced%20fire%20risk%20cigarettes%20- %20supplier%20guide.pdf Australian Building Codes Board. (2016, February). National Construction Code Volume Two http://www.abcb.gov.au/Resources/Publications/NCC/NCC-2016-Volume-Two Babrauskas, V. (2003). Ignition handbook: Principles and applications to fire safety engineering, fire investigation, risk management and forensic science. Issaquah, WA: Fire Science Publishers. Engelsman, M. (2015). Smoke Alarms in Homes: An Analysis (Fire Research Report No. D15/102527). Greenacre, NSW: Fire & Rescue New South Wales. Fazzini, T. M., Perkins, R., & Grossman, D. (2000). Ionization and photoelectric smoke alarms in rural Alaskan homes. Western Journal of Medicine, 173(2), 89–92. Milarcik, E., Elenick, S., & Roby, R. (2008). A relative time analysis of the performance of residential smoke detection technologies. Fire Technology, 44(4), 337–349. National Fire Protection Association., & Society of Fire Protection Engineers. (2002). SFPE handbook of fire protection engineering. Quincy, Mass.; Bethesda, Md.: National Fire Protection Association ; Society of Fire Protection Engineers. Novozhilov, V., Shi, L., Guerrieri, M., Moinuddin, K., Bruck, D., & Joseph, P. (2015). Australian Building Codes Board’s Domestic Smoke Alarm Study: Ionisation versus Photoelectric. Melbourne, Australia: Victoria University. Standards Australia. (2007). AS 4830-2007 Determination of the extinction propensity of cigarettes (Standard No. AS 4830-2007). Sydney: Standards Australia. Standards Australia. (2014). AS 3786 - 2014 Smoke alarms using scattered light, transmitted light or ionization (Standard No. AS 3786: 2014). Sydney: Standards Australia. US Environmental Protection Agency. (2016). Access Acute Exposure Guideline Levels (AEGLs) Values. Retrieved 7 May 2016, from https://www.epa.gov/aegl/accessacute-exposure-guideline-levels-aegls-values APPENDIX A Furnishing materials used in testing Table A1. Furnishing materials Item Materials Double beds Aluminium frame, timber slats (pine) Mattresses Polyurethane foam, polyester cover Pillows and quilts 100% polypropylene outer, 100% polyester fill Pillow cases and quilt covers 52% polyester, 48% cotton Two-seater sofa Polyester cover, polyurethane foam inner, timber frame Sofa cushions 100% polyester outer and fill Chairs Timber laminate, chipboard, polyurethane foam padding, polyester cover Waste bins Steel mesh Tea towels 100% cotton Fire research report -Smoke Alarms in Homes: Stage 2 Fire research report -Smoke Alarms in Homes: Stage 2 References Table B1. Tenability limits used in gas calculations – cont. Effective concentration for Escape Impairment (ppm) [REF] Effective concentration for Incapacitation (ppm) [REF] Lethal Effective Dose (ppm.min) [REF] Phenol C6H5OH 29 [AEGL] - - Propane C3H8 17000 [AEGL] 33000 [AEGL] 990000 [AEGL] Propene C3H6 - - - p-Xylene C8H10 2500 [AEGL] 3600 [AEGL] 108000 [AEGL] Styrene C8H8 230 [AEGL] 1900 [AEGL] 57000 [AEGL] Sulfur dioxide SO2 24 [SFPE] 120 [SFPE] 12000 [SFPE] Toluene C7H8 1400 [AEGL] 5200 [AEGL] 156000 [AEGL] APPENDIX C CSIRO Smoke Alarm Verification Test Reports XF3033/R1 Test Report 1 XF3033/R3 Test Report 2 The tests reported in XF3033/R1 and XF3033/R3 were conducted by CSIRO Infrastructure Technologies to pre-qualify the alarm response threshold (sensitivity) and directional dependence of smoke alarms used in this research. The results were used to verify that all alarms used in the study were operable prior to installation in real fire test scenarios.2. Methodology
2.1 Burn unit and furnishings
Figure 1 Layout of two-bedroom residence showing positions of smoke alarms ○ , thermocouples $\blacksquare$ and gas probes ■.
Table 1 Test scenarios suggested by Novozhilov et al., (2015) [* denotes scenarios excluded in Stage 2]
Scenario Location Fire Type Materials Ignition Method Conditions 1 Bedroom 1 Smouldering Bedding Cigarette/small electric heater Bedroom 1 door closed; Bedroom 2 door open; 2 Bedroom 2 Smouldering Bedding Cigarette/small electric heater Two bedroom doors open 3 Lounge Smouldering Upholstered couch Cigarette/small electric heater Bedroom 1 door open; Bedroom 2 door closed 4* Bedroom 2 Smouldering Bedding Cigarette/small electric heater Two bedroom doors open 5 Bedroom 2 Flaming Bedding LPG gas flame Two bedroom doors open 6* Bedroom 1 Smouldering Bedding Cigarette/small electric heater Bedroom 1 door closed; Bedroom 2 door open 7 Bedroom 1 Smouldering Bedding Cigarette/small electric heater Two bedroom doors open 8* Lounge Smouldering Upholstered couch Cigarette/small electric heater Bedroom 1 door open; Bedroom 2 door closed 9* Bedroom 2 Smouldering Bedding Cigarette/small electric heater Two bedroom doors open 10 Bedroom 1 Flaming Bedding LPG gas flame Two bedroom doors open 11 Kitchen Smouldering Electrical cable LPG gas flame or alternative All room doors open 12 Kitchen Flaming Electric equipment Cartridge heater or alternative All room doors open 13 Lounge Flaming Upholstered furniture LPG gas flame or alternative All room doors open 14 Lounge Smouldering Upholstered furniture Cigarette/small electric heater All room doors open 15 Lounge Flaming Papers LPG gas flame or alternative All room doors open 16 Lounge Flaming Wood chair LPG gas flame or alternative All room doors open 17 Kitchen Flaming Cooking pan LPG gas flame or alternative All room doors open 18 Kitchen Flaming Clothing LPG gas flame or alternative All room doors open 19 Laundry room Smouldering Electric equipment Cartridge heater or alternative All room doors open 20 Laundry room Smouldering Electric equipment Cartridge heater or alternative All room doors open except laundry room door 21* Bedroom 1 Flaming Pillow LPG gas flame or alternative All room doors open 22 Bedroom 1 Flaming Pillow LPG gas flame or alternative All room doors open except Bedroom 1 door 23 Bedroom 2 Flaming Paper LPG gas flame or alternative All room doors open 24 Bedroom 2 Flaming Paper LPG gas flame or alternative All room doors open except Bedroom 1 door 25 Hall Flaming Wood chair LPG gas flame or alternative All room doors open 26 Hall Smouldering Upholstered furniture Cigarette/small electric heater All room doors open 27 Kitchen Nuisance source Cooking different foods Cooking equipment All room doors open 28 Bathroom Nuisance source Steam Hot shower All room doors open 29 Lounge Nuisance source Smoking cigarette(s) Lighter All room doors open 30 Lounge Nuisance source Candle(s) Lighter All room doors open 2.2 Test scenarios
Table 2 Stage 2 Test scenarios and configurations
Scenario Location Fire Type Materials Ignition Method Conditions 1 Bedroom 1 Smouldering Bedding Soldering iron Bedroom 1 door closed; Bedroom 2 door open; 2 Bedroom 2 Smouldering Bedding Soldering iron Two bedroom doors open 3 Lounge Smouldering Upholstered couch Soldering iron Bedroom 1 door open; Bedroom 2 door closed 5 Bedroom 2 Flaming Bedding Butane lighter Two bedroom doors open 7a Bedroom 1 Smouldering Bedding Soldering iron Two bedroom doors open 7b Bedroom 1 Smouldering Bedding Cigarette Two bedroom doors open 10 Bedroom 1 Flaming Bedding Butane lighter Two bedroom doors open 11 Kitchen Smouldering Electrical cable Stove element Two bedroom doors open 12 Kitchen Flaming Electric equipment Toaster Two bedroom doors open 13 Lounge Flaming Upholstered furniture Butane lighter Two bedroom doors open 14a Lounge Smouldering Upholstered furniture Soldering iron Two bedroom doors open 14b Lounge Smouldering Upholstered furniture Cigarette Two bedroom doors open 15 Lounge Flaming Papers Butane lighter Two bedroom doors open 16 Lounge Flaming Wood chair Butane lighter Two bedroom doors open 17 Kitchen Flaming Cooking pan Butane lighter Two bedroom doors open 18 Kitchen Flaming Tea towel Butane lighter Two bedroom doors open 19 Laundry room Smouldering Clothes iron Clothes iron Two bedroom doors open 20 Laundry room Smouldering Clothes iron Clothes iron Two bedroom doors open, laundry room door closed 22 Bedroom 1 Flaming Pillow Butane lighter Bedroom 1 door closed; Bedroom 2 door open; 23 Bedroom 2 Flaming Paper Butane lighter Two bedroom doors open 24 Bedroom 2 Flaming Paper Butane lighter Bedroom 1 door closed; Bedroom 2 door open; 25 Hall Flaming Wood chair Butane lighter Two bedroom doors open 26 Hall Smouldering Upholstered chair Soldering iron Two bedroom doors open 27 Kitchen Nuisance source Toast Oven/Grill Two bedroom doors open 28 Bathroom Nuisance source Steam Hot water urn Two bedroom doors open 29 Lounge Nuisance source Smoking cigarettes Butane lighter Two bedroom doors open 30 Lounge Nuisance source Incense Butane lighter Two bedroom doors open 2.3 Fire ignition and extinguishment
Figure 2 Soldering iron and cotton batting sheets used to initiate smouldering fires
Figure 3 Butane BBQ lighter used in lighting flaming fires, pictured here used in lighting incense
2.4 Smoke alarms
Figure 4 Diagram defining the dead air space and correct smoke alarm placement according to the Australian Building Codes Board (2016, p. 279)
Figure 5 Wiring to the smoke alarm sounder
Figure 6 Before (left) and after (right) photographs of Scenario 1, Tests 1 (top), 2 (middle) and 3 (bottom).
Table 3 Scenario 1 smoke alarm activation times (min:sec). Empty cells indicate non-activations.
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling 32:45 32:38 33:05 32:32 Hall Wall 32:38 32:26 32:45 32:32 Hall Dead-space 32:45 32:38 32:45 32:38 ROO Ceiling 11:44 16:44 16:44 11:37 08:27 11:50 11:09 08:00 05:56 06:42 06:17 05:23 ROO Wall 12:23 12:49 12:03 12:17 09:05 09:58 08:39 08:59 05:56 06:09 05:37 06:09 ROO Dead-space 11:03 11:50 11:37 10:50 08:52 09:45 09:12 08:06 05:04 05:56 04:57 05:10 Table 4 Scenario 1 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres
TEST 1 TEST 1 TEST 2 TEST 2 TEST 3 TEST 3 ROO Hall ROO Hall ROO Hall FEC IMPAIRED ESCAPE 0.3 01:58 22:28 06:07 00:35 07:04 01:44 FEC IMPAIRED ESCAPE 1.0 06:42 33:14 11:33 08:44 01:44 FEC INCAPACITATION 0.3 11:09 12:57 10:49 FEC INCAPACITATION 1.0 15:52 FED ASPHYXIATION 0.3 30:53 FED ASPHYXIATION 1.0 Figure 7 Scenario 1, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 1 activation times by alarm type and location
Figure 8 Scenario 1, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 2 activation times by alarm type and location
Figure 9 Scenario 1, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Figure 10 Scenario 1, Test 2 smoke alarm activation times by type in comparison with calculated hallway FECs for impaired escape and incapacitation, and FED.
Figure 11 Scenario 1, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Figure 12 Scenario 1, Test 3 smoke alarm activation times by type in comparison with calculated hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Table 5 Scenario 1 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Bedroom 1 tenability limits. Note: ASET≤0 is no ASET, 0
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling -21.60 -21.49 -21.93 -21.38 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Hall Wall -21.49 -21.28 -21.60 -21.38 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Hall Dead-space -21.60 -21.49 -21.60 -21.49 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A ROO Ceiling -0.58 -5.59 -5.59 -0.47 4.51 1.12 1.79 4.95 4.88 4.12 4.54 5.44 ROO Wall -1.24 -1.67 -0.91 -1.13 3.86 2.99 4.29 3.97 4.88 4.66 5.21 4.66 ROO Dead-space 0.09 -0.69 -0.47 0.31 4.08 3.20 3.74 4.85 5.76 4.88 5.87 5.65 Table 6 Scenario 1 atmospheric conditions
Test 1 Test 2 Test 3 Wind Speed (km/h) 0.63 0.53 0.51 Air Temp (°C) 16.96 16.88 17.52 Rel. Humidity (%) 36.02 64.80 59.99 Air Pressure (mbar) 1019.81 1021.42 1018.51 3.2 SCENARIO 2: Smouldering bedding fire in Bedroom 2, doors open
Figure 13 Before (left) and after (right) photographs of Scenario 2, Tests 1 (top), 2 (middle) and 3 (bottom).
Table 7 Scenario 2 smoke alarm activation times (min:sec)
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling 43:35 28:16 29:01 25:40 37:54 28:02 27:03 28:35 Hall Wall 26:15 29:08 26:22 27:55 24:52 30:08 Hall Dead-space 30:15 35:27 26:09 29:29 26:24 31:40 ROO Ceiling 13:20 14:37 07:17 07:10 10:34 09:55 08:56 09:48 22:41 12:13 11:33 12:00 ROO Wall 08:40 12:23 08:34 09:05 09:41 10:34 09:48 10:15 12:32 12:32 12:39 12:32 ROO Dead-space 06:51 08:21 06:37 06:25 09:09 08:50 06:11 08:50 11:07 11:07 10:54 10:40 Table 8 Scenario 2 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres
TEST 1 TEST 1 TEST 2 TEST 2 TEST 3 TEST 3 ROO Hall ROO Hall ROO Hall FEC IMPAIRED ESCAPE 0.3 01:30 00:05 07:23 01:56 09:53 06:46 FEC IMPAIRED ESCAPE 1.0 10:57 11:56 10:02 11:00 FEC INCAPACITATION 0.3 12:29 29:13 11:00 11:50 FEC INCAPACITATION 1.0 FED ASPHYXIATION 0.3 44:20 42:43 40:04 FED ASPHYXIATION 1.0 Test 1 activation times by alarm type and location
Figure 14 Scenario 2, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 1 activation times by alarm type and location
Figure 15 Scenario 2, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 2 activation times by alarm type and location
Figure 16 Scenario 2, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 2 activation times by alarm type and location
Figure 17 Scenario 2, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 3 activation times by alarm type and location
Figure 18 Scenario 2, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 3 activation times by alarm type and location
Figure 19 Scenario 2, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Table 9 Scenario 2 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Bedroom 2 tenability limits. Note: ASET≤0 is no ASET, 0
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling -31.10 #N/A -15.78 #N/A -18.02 #N/A -14.67 -26.90 -16.19 #N/A -15.21 -16.76 Hall Wall #N/A #N/A -13.77 #N/A -18.13 #N/A -15.37 #N/A -16.08 #N/A -13.04 -18.30 Hall Dead-space #N/A #N/A -17.77 #N/A -24.45 #N/A -15.15 #N/A -17.65 #N/A -14.56 -19.84 ROO Ceiling -0.86 -2.13 5.20 5.32 0.43 1.08 2.06 1.20 -10.85 -0.38 0.28 -0.16 ROO Wall 3.82 0.10 3.92 3.40 1.31 0.43 1.20 0.76 -0.70 -0.70 -0.82 -0.70 ROO Dead-space 5.64 4.13 5.86 6.07 1.85 2.17 4.82 2.17 0.72 0.72 0.94 1.16 Table 10 Scenario 2 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling -14.37 #N/A 0.95 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Hall Wall #N/A #N/A 2.96 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Hall Dead-space #N/A #N/A -1.04 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A ROO Ceiling 15.88 14.60 21.93 22.05 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A ROO Wall 20.55 16.83 20.65 20.13 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A ROO Dead-space 22.37 20.86 22.59 22.80 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Table 11 Scenario 2 atmospheric conditions
Test 1 Test 2 Test 3 Wind Speed (km/h) 0.00 0.90 0.61 Air Temp (°C) 20.04 22.95 24.61 Rel. Humidity (%) 36.78 27.50 30.62 Air Pressure (mbar) 1012.32 1009.18 1013.80 3.3 SCENARIO 3: Smouldering lounge fire in lounge room, Bedroom 2 door closed
Figure 20 Before (left) and after (right) photographs of Scenario 3, Tests 1 (top), 2 (middle) and 3 (bottom).
Table 12 Scenario 3 smoke alarm activation times (min:sec)
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling 6.98 #N/A 7.20 7.53 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Hall Wall 8.40 -2.15 7.75 8.07 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Hall Dead-space 6.98 -2.36 7.86 6.65 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A ROO Ceiling -3.36 #N/A -12.61 7.75 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A ROO Wall 6.19 -1.91 6.86 8.28 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A ROO Dead-space -6.78 #N/A -2.15 -6.24 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Table 13 Scenario 3 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres
TEST 1 TEST 1 TEST 2 TEST 2 TEST 3 TEST 3 Bed1 Hall Bed1 Hall Bed1 Hall FEC IMPAIRED ESCAPE 0.3 9:07 0:18 5:52 7:31 9:40 3:37 FEC IMPAIRED ESCAPE 1.0 18:34 5:18 13:39 31:01 17:52 11:13 FEC INCAPACITATION 0.3 14:24 14:24 FEC INCAPACITATION 1.0 FED ASPHYXIATION 0.3 FED ASPHYXIATION 1.0 Test 1 activation times by alarm type and location
Figure 21 Scenario 3, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 1 activation times by alarm type and location
Figure 22 Scenario 3, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Figure 23 Scenario 3, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Figure 24 Scenario 3, Test 2 smoke alarm activation times by type in comparison with calculated hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 3 activation times by alarm type and location
Figure 25 Scenario 3, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 3 activation times by alarm type and location
Figure 26 Scenario 3, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Table 14 Scenario 3 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling 6.98 14.40 7.20 7.53 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Hall Wall 8.40 -2.15 7.75 8.07 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Hall Dead-space 6.98 -2.36 7.86 6.65 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A ROO Ceiling -3.36 14.40 -12.61 7.75 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A ROO Wall 6.19 -1.91 6.86 8.28 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A ROO Dead-space -6.78 14.40 -2.15 -6.24 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Table 15 Scenario 3 atmospheric conditions
Test 1 Test 2 Test 3 Wind Speed (km/h) 0.60 0.59 0.78 Air Temp (°C) 15.21 19.88 22.48 Rel. Humidity (%) 48.80 32.07 20.33 Air Pressure (mbar) 1013.23 1011.11 1009.46 3.4 SCENARIO 5: Flaming bedding fire in Bedroom 2, bedroom doors open
Figure 27 Before (left) and after (right) photographs of Scenario 5, Tests 1 (top), 2 (middle) and 3 (bottom).
Table 16 Scenario 5 smoke alarm activation times (min:sec)
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling 01:59 01:46 01:39 01:52 01:57 01:37 01:57 01:57 01:31 01:18 01:45 01:37 Hall Wall 01:59 01:33 01:46 01:52 01:51 01:37 01:57 01:57 01:45 01:31 01:45 01:37 Hall Dead-space 01:52 01:46 01:39 01:46 01:57 02:05 01:44 01:51 01:31 01:58 01:31 01:31 ROO Ceiling 01:06 00:46 00:46 01:00 01:17 00:50 01:24 01:10 01:11 00:44 00:44 00:51 ROO Wall 01:12 01:06 01:39 01:19 01:24 01:17 01:17 01:31 01:11 00:58 01:45 01:11 ROO Dead-space 01:19 01:00 01:33 01:06 01:37 01:04 01:10 01:24 01:04 00:58 01:04 01:04 Table 17 Scenario 5 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres
TEST 1 TEST 1 TEST 2 TEST 2 TEST 3 TEST 3 ROO Hall ROO Hall ROO Hall FEC IMPAIRED ESCAPE 0.3 01:43 00:25 01:55 03:55 01:31 FEC IMPAIRED ESCAPE 1.0 02:09 02:52 02:37 02:39 FEC INCAPACITATION 0.3 02:09 04:04 02:46 FEC INCAPACITATION 1.0 FED ASPHYXIATION 0.3 FED ASPHYXIATION 1.0 Test 1 activation times by alarm type and location
Figure 28 Scenario 5, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 1 activation times by alarm type and location
Figure 29 Scenario 5, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 2 activation times by alarm type and location
Figure 30 Scenario 5, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 2 activation times by alarm type and location
Figure 31 Scenario 5, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 3 activation times by alarm type and location
Figure 32 Scenario 5, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 3 activation times by alarm type and location
Figure 33 Scenario 5, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Table 18 Scenario 5 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Bedroom 2 tenability limits. Note: ASET≤0 is no ASET, 0
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling 0.17 0.39 0.49 0.28 #/N/A #/N/A #/N/A #/N/A 1.27 1.48 1.04 1.16 Hall Wall 0.17 0.60 0.39 0.28 #/N/A #/N/A #/N/A #/N/A 1.04 1.27 1.04 1.16 Hall Dead-space 0.28 0.39 0.49 0.39 #/N/A #/N/A #/N/A #/N/A 1.27 0.82 1.27 1.27 ROO Ceiling 1.05 1.38 1.38 1.15 #/N/A #/N/A #/N/A #/N/A 1.60 2.05 2.05 1.93 ROO Wall 0.94 1.05 0.49 0.83 #/N/A #/N/A #/N/A #/N/A 1.60 1.82 1.04 1.60 ROO Dead-space 0.83 1.15 0.60 1.05 #/N/A #/N/A #/N/A #/N/A 1.72 1.82 1.72 1.72 Table 19 Scenario 5 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling 2.10 2.32 2.43 2.21 #/N/A #/N/A #/N/A #/N/A #/N/A #/N/A #/N/A #/N/A Hall Wall 2.10 2.54 2.32 2.21 #/N/A #/N/A #/N/A #/N/A #/N/A #/N/A #/N/A #/N/A Hall Dead-space 2.21 2.32 2.43 2.32 #/N/A #/N/A #/N/A #/N/A #/N/A #/N/A #/N/A #/N/A ROO Ceiling 2.98 3.31 3.31 3.09 #/N/A #/N/A #/N/A #/N/A #/N/A #/N/A #/N/A #/N/A ROO Wall 2.88 2.98 2.43 2.77 #/N/A #/N/A #/N/A #/N/A #/N/A #/N/A #/N/A #/N/A ROO Dead-space 2.77 3.09 2.54 2.98 #/N/A #/N/A #/N/A #/N/A #/N/A #/N/A #/N/A #/N/A Table 20 Scenario 5 atmospheric conditions
Test 1 Test 2 Test 3 Wind Speed (km/h) 0.47 0.88 1.21 Air Temp (°C) 26.24 27.30 27.13 Rel. Humidity (%) 40.68 33.96 34.54 Air Pressure (mbar) 1008.24 1007.51 1007.76 3.5 SCENARIO 7a: Smouldering bedding fire in Bedroom 1, doors open
Figure 34 Before (left) and after (right) photographs of Scenario 7a, Tests 1 (top), 2 (middle) and 3 (bottom).
Table 21 Scenario 7a smoke alarm activation times (min:sec)
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling 29:59 10:44 10:37 15:12 19:46 29:25 Hall Wall 10:03 09:44 10:03 10:03 21:54 Hall Dead-space 08:58 23:47 08:51 08:53 11:19 09:52 08:25 13:59 13:46 13:40 ROO Ceiling 05:49 06:15 05:55 05:37 04:33 05:41 05:28 04:20 07:14 07:39 07:33 07:00 ROO Wall 06:53 07:39 07:01 07:01 05:54 05:35 05:48 05:41 07:58 08:30 07:33 08:30 ROO Dead-space 05:23 05:16 05:23 05:10 05:07 04:46 05:07 04:20 07:58 07:39 07:39 08:05 Table 22 Scenario 7a Time after ignition (min:sec) at which tenability limits were reached 1.5 metres
TEST 1 TEST 1 TEST 2 TEST 2 TEST 3 TEST 3 ROO Hall ROO Hall ROO Hall FEC IMPAIRED ESCAPE 0.3 03:25 03:25 05:54 14:10 00:54 00:54 FEC IMPAIRED ESCAPE 1.0 04:49 04:49 08:24 09:23 09:23 FEC INCAPACITATION 0.3 05:39 05:39 09:55 09:55 09:55 FEC INCAPACITATION 1.0 FED ASPHYXIATION 0.3 31:10 31:10 28:34 29:39 26:29 28:00 FED ASPHYXIATION 1.0 Figure 35 Scenario 7a, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Figure 36 Scenario 7a, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Figure 37 Scenario 7a, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Figure 38 Scenario 7a, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 3 activation times by alarm type and location
Figure 39 Scenario 7a, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 3 activation times by alarm type and location
Figure 40 Scenario 7a, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Table 23 Scenario 7a Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Bedroom 1 tenability limits. Note: ASET≤0 is no ASET, 0
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling -24.34 -5.08 -4.96 -9.55 #N/A #N/A -9.83 #N/A #N/A #N/A -19.48 #N/A Hall Wall -4.41 -4.09 -4.41 -4.41 #N/A #N/A #N/A #N/A #N/A #N/A -11.97 #N/A Hall Dead-space -3.32 #N/A -18.13 -3.21 1.05 -1.38 0.07 1.52 -4.05 #N/A -3.84 -3.73 ROO Ceiling -0.17 -0.61 -0.27 0.04 5.38 4.24 4.46 5.61 2.70 2.28 2.38 2.93 ROO Wall -1.24 -2.01 -1.36 -1.36 4.03 4.35 4.14 4.24 1.96 1.43 2.38 1.43 ROO Dead-space 0.27 0.38 0.27 0.48 4.81 5.16 4.81 5.61 1.96 2.28 2.28 1.86 Table 24 Scenario 7a atmospheric conditions
Test 1 Test 2 Test 3 Wind Speed (km/h) 0.41 0.74 1.14 Air Temp (°C) 17.86 19.18 17.23 Rel. Humidity (%) 48.07 40.89 42.51 Air Pressure (mbar) 999.06 998.73 1000.71 3.6 SCENARIO 7b: Smouldering bedding fire in Bedroom 1, doors open, cigarette ignition
Figure 41 Before (left) and after (right) photographs of Scenario 7b, Tests 1 (top), 2 (middle) and 3 (bottom).
Table 25 Scenario 7b smoke alarm activation times (min:sec)
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling 24:50 26:34 26:21 Hall Wall Hall Dead-space 15:00 14:27 14:53 11:27 15:22 12:32 11:21 13:17 14:30 13:51 13:17 ROO Ceiling 10:22 10:22 10:29 11:03 09:16 11:21 10:41 09:03 11:44 12:05 10:50 12:11 ROO Wall 11:03 14:01 10:10 10:55 09:56 09:50 10:03 10:03 13:04 14:23 11:52 12:56 ROO Dead-space 10:42 10:22 07:31 08:18 09:29 09:23 09:50 08:29 12:05 11:52 13:04 11:17 Table 26 Scenario 7b Time after ignition (min:sec) at which tenability limits were reached 1.5 metres
TEST 1 TEST 1 TEST 2 TEST 2 TEST 3 TEST 3 ROO Hall ROO Hall ROO Hall FEC IMPAIRED ESCAPE 0.3 04:30 04:30 03:25 03:25 00:54 00:54 FEC IMPAIRED ESCAPE 1.0 17:18 17:18 07:52 07:52 11:20 11:20 FEC INCAPACITATION 0.3 17:26 17:26 12:52 12:52 11:45 11:45 FEC INCAPACITATION 1.0 FED ASPHYXIATION 0.3 27:05 27:05 28:18 28:18 FED ASPHYXIATION 1.0 Figure 42 Scenario 7b, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Figure 43 Scenario 7b, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Figure 44 Scenario 7b, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Figure 45 Scenario 7b, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Figure 46 Scenario 7b, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 3 activation times by alarm type and location
Figure 47 Scenario 7b, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Table 27 Scenario 7b Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Bedroom 1 tenability limits. Note: ASET≤0 is no ASET, 0
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling #N/A #N/A -7.39 #N/A #N/A #N/A -13.70 #N/A #N/A #N/A -14.60 #N/A Hall Wall #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Hall Dead-space 2.43 #N/A 2.98 2.55 1.41 -2.50 0.33 1.52 -1.53 -2.75 -2.09 -1.53 ROO Ceiling 7.06 7.06 6.95 6.39 3.60 1.52 2.18 3.81 0.01 -0.33 0.91 -0.44 ROO Wall 6.39 3.42 7.27 6.51 2.93 3.04 2.82 2.82 -1.31 -2.64 -0.11 -1.19 ROO Dead-space 6.73 7.06 9.91 9.13 3.38 3.49 3.04 4.38 -0.33 -0.11 -1.31 0.47 Table 28 Scenario 7b atmospheric conditions
Test 1 Test 2 Test 3 Wind Speed (km/h) 0.78 0.79 1.01 Air Temp (°C) 18.13 19.77 19.62 Rel. Humidity (%) 40.41 37.26 39.91 Air Pressure (mbar) 995.65 995.09 994.89 3.7 SCENARIO 10: Flaming fire in Bedroom 1, bedroom doors open
Figure 48 Before (left) and after (right) photographs of Scenario 10, Tests 1 (top), 2 (middle) and 3 (bottom).
Table 29 Scenario 10 smoke alarm activation times (min:sec)
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling 01:38 01:19 01:38 01:32 01:21 01:08 01:08 01:14 02:12 01:25 01:19 01:32 Hall Wall 01:38 01:19 01:26 01:32 01:14 01:08 01:21 01:14 01:39 01:19 01:32 01:39 Hall Dead-space 01:32 01:19 01:19 01:26 01:08 01:00 01:08 01:00 01:25 01:12 01:25 01:25 ROO Ceiling 01:06 00:39 00:47 00:59 00:54 00:41 00:47 00:47 #N/A 00:45 00:52 00:45 ROO Wall 01:12 00:53 01:52 01:06 00:54 00:47 00:54 00:54 00:52 00:58 00:58 01:12 ROO Dead-space 01:12 00:53 01:26 01:06 01:00 00:47 00:54 00:54 00:58 00:39 00:45 00:52 Table 30 Scenario 10 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres
TEST 1 TEST 1 TEST 2 TEST 2 TEST 3 TEST 3 ROO Hall ROO Hall ROO Hall FEC IMPAIRED ESCAPE 0.3 00:54 02:35 00:01 02:40 01:17 FEC IMPAIRED ESCAPE 1.0 01:03 00:18 03:30 01:58 FEC INCAPACITATION 0.3 01:58 FEC INCAPACITATION 1.0 FED ASPHYXIATION 0.3 FED ASPHYXIATION 1.0 Figure 49 Scenario 10, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 1 activation times by alarm type and location
Figure 50 Scenario 10, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 2 activation times by alarm type and location
Figure 51 Scenario 10, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Figure 52 Scenario 10, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Figure 53 Scenario 10, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Figure 54 Scenario 10, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Table 31 Scenario 10 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Bedroom 1 tenability limits. Note: ASET≤0 is no ASET, 0
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling #N/A #N/A #N/A #N/A 0.62 0.84 0.84 0.73 #N/A #N/A #N/A #N/A Hall Wall #N/A #N/A #N/A #N/A 0.73 0.84 0.62 0.73 #N/A #N/A #N/A #N/A Hall Dead-space #N/A #N/A #N/A #N/A 0.84 0.96 0.84 0.96 #N/A #N/A #N/A #N/A ROO Ceiling #N/A #N/A #N/A #N/A 1.07 1.28 1.18 1.18 #N/A #N/A #N/A #N/A ROO Wall #N/A #N/A #N/A #N/A 1.07 1.18 1.07 1.07 #N/A #N/A #N/A #N/A ROO Dead-space #N/A #N/A #N/A #N/A 0.96 1.18 1.07 1.07 #N/A #N/A #N/A #N/A Table 32 Scenario 10 atmospheric conditions
Test 1 Test 2 Test 3 Wind Speed (km/h) 0.58 0.58 0.62 Air Temp (°C) 17.88 17.88 18.78 Rel. Humidity (%) 63.40 63.40 49.47 Air Pressure (mbar) 1016.83 1016.83 1013.19 3.8 SCENARIO 11: Smouldering electrical fire in kitchen, bedroom doors open
Figure 55 Before (left) and after (right) photographs of Scenario 11, Tests 1 (top), 2 (middle) and 3 (bottom).
Table 33 Scenario 11 smoke alarm activation times (min:sec)
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling 04:29 05:16 04:02 03:56 03:33 04:20 02:52 03:19 03:48 04:00 02:35 03:22 Hall Wall 04:09 04:36 04:15 03:56 03:05 03:45 03:12 03:05 03:35 04:48 04:27 03:48 Hall Dead-space 05:16 05:03 04:09 05:03 03:59 04:06 03:12 03:59 03:41 04:00 03:28 03:54 ROO Ceiling 02:10 02:30 02:17 02:10 02:33 02:20 02:59 02:20 05:47 06:34 05:34 06:08 ROO Wall 03:23 03:16 03:30 03:30 04:20 03:39 03:59 03:33 05:34 04:14 04:27 04:08 ROO Dead-space 02:50 02:57 02:43 02:50 #N/A 03:33 03:45 03:52 #N/A 09:13 07:34 05:01 Table 34 Scenario 11 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres
Test 1 activation times by alarm type and location
Figure 56 Scenario 11, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 1 activation times by alarm type and location
Figure 57 Scenario 11, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 2 activation times by alarm type and location
Figure 58 Scenario 11, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Figure 59 Scenario 11, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Figure 60 Scenario 11, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 3 activation times by alarm type and location
Figure 61 Scenario 11, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Table 35 Scenario 11 atmospheric conditions
Test 1 Test 2 Test 3 Wind Speed (km/h) 0.40 0.42 0.50 Air Temp (°C) 14.76 12.08 15.17 Rel. Humidity (%) 57.26 43.43 37.31 Air Pressure (mbar) 1000.47 1021.48 1020.90 3.9 SCENARIO 12: Flaming electrical fire in kitchen, bedroom doors open
Figure 62 Before (left) and after (right) photographs of Scenario 12, Tests 1 (top), 2 (middle) and 3 (bottom).
Table 36 Scenario 12 smoke alarm activation times (min:sec)
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling 03:49 03:42 03:49 03:35 02:13 02:47 01:40 01:53 04:42 04:16 04:49 04:09 Hall Wall 03:42 03:49 03:42 03:42 01:53 02:07 01:34 01:53 04:09 04:16 04:02 04:16 Hall Dead-space 03:55 04:21 04:02 03:55 02:34 03:33 02:47 02:40 05:29 06:37 05:09 06:30 ROO Ceiling 03:21 03:14 03:28 03:14 03:00 03:00 01:07 02:53 03:37 03:44 03:17 03:37 ROO Wall 03:28 03:21 03:42 03:21 03:26 03:13 03:26 03:07 06:03 05:48 04:42 05:48 ROO Dead-space 03:21 03:14 03:28 03:21 03:19 02:53 03:13 03:00 05:56 05:36 05:42 05:48 Table 37 Scenario 12 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres
TEST 1 TEST 1 TEST 2 TEST 2 TEST 3 TEST 3 Bed1 Hall Bed1 Hall Bed1 Hall FEC IMPAIRED ESCAPE 0.3 05:18 02:59 00:51 FEC IMPAIRED ESCAPE 1.0 FEC INCAPACITATION 0.3 FEC INCAPACITATION 1.0 FED ASPHYXIATION 0.3 FED ASPHYXIATION 1.0 Test 1 activation times by alarm type and location
Figure 63 Scenario 12, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 1 activation times by alarm type and location
Figure 64 Scenario 12, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 2 activation times by alarm type and location
Figure 65 Scenario 12, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 2 activation times by alarm type and location
Figure 66 Scenario 12, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 3 activation times by alarm type and location
Figure 67 Scenario 12, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 3 activation times by alarm type and location
Figure 68 Scenario 12, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Table 38 Scenario 12 atmospheric conditions
Test 1 Test 2 Test 3 Wind Speed (km/h) 0.65 0.45 0.67 Air Temp (°C) 14.79 17.54 18.44 Rel. Humidity (%) 47.16 36.30 32.66 Air Pressure (mbar) 1013.20 1011.88 1010.88 3.10 SCENARIO 13: Flaming lounge fire in lounge room, bedroom doors open
Figure 69 Before (left) and after (right) photographs of Scenario 13, Tests 1 (top), 2 (middle) and 3 (bottom).
Table 39 Scenario 13 smoke alarm activation times (min:sec)
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling 02:29 01:35 01:48 02:22 02:26 02:00 02:00 02:26 02:32 01:52 01:38 02:25 Hall Wall 02:35 01:35 02:09 02:22 02:26 01:33 01:33 02:26 02:18 01:45 01:52 02:25 Hall Dead-space 02:41 02:02 02:29 02:35 02:40 01:53 02:13 02:34 02:39 01:52 01:59 02:39 ROO Ceiling 01:55 00:42 01:09 01:55 01:40 00:26 01:00 01:53 01:45 00:32 00:32 01:52 ROO Wall 02:15 01:09 01:42 02:15 01:53 01:12 01:20 02:07 02:12 01:18 01:18 02:12 ROO Dead-space 02:02 00:56 01:15 02:02 01:40 01:00 01:27 01:53 01:38 00:58 00:58 01:59 Table 40 Scenario 13 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres
TEST 1 TEST 1 TEST 2 TEST 2 TEST 3 TEST 3 Bed1 Hall Bed1 Hall Bed1 Hall FEC IMPAIRED ESCAPE 0.3 02:59 05:01 01:22 04:07 03:11 FEC IMPAIRED ESCAPE 1.0 03:40 06:08 FEC INCAPACITATION 0.3 03:48 FEC INCAPACITATION 1.0 FED ASPHYXIATION 0.3 FED ASPHYXIATION 1.0 Test 1 activation times by alarm type and location
Figure 70 Scenario 13, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 1 activation times by alarm type and location
Figure 71 Scenario 13, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 2 activation times by alarm type and location
Figure 72 Scenario 13, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 2 activation times by alarm type and location
Figure 73 Scenario 13, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 3 activation times by alarm type and location
Figure 74 Scenario 13, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 2 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 3 activation times by alarm type and location
Figure 75 Scenario 13, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Table 41 Scenario 13 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling 1.32 2.21 2.00 1.43 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Hall Wall 1.21 2.21 1.66 1.43 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Hall Dead-space 1.11 1.77 1.32 1.21 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A ROO Ceiling 1.88 3.09 2.65 1.88 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A ROO Wall 1.55 2.65 2.10 1.55 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A ROO Dead-space 1.77 2.87 2.54 1.77 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Table 42 Scenario 13 atmospheric conditions
Test 1 Test 2 Test 3 Wind Speed (km/h) 0.81 0.46 0.26 Air Temp (°C) 18.04 19.32 14.53 Rel. Humidity (%) 29.06 45.67 70.24 Air Pressure (mbar) 998.98 1026.23 1018.09 3.11 SCENARIO 14a: Smouldering lounge fire in lounge room, bedroom doors open
Figure 76 Before (left) and after (right) photographs of Scenario 14a, Tests 1 (top), 2 (middle) and 3 (bottom).
Table 43 Scenario 14a smoke alarm activation times (min:sec)
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling 07:13 07:39 05:27 05:00 09:48 17:39 09:27 09:21 09:46 11:26 10:32 08:54 Hall Wall 05:27 05:59 05:47 05:40 09:34 15:54 08:55 09:01 09:01 10:13 09:27 08:41 Hall Dead-space 06:06 07:52 06:12 05:59 10:47 10:53 09:27 10:27 10:13 10:06 09:39 09:53 ROO Ceiling 07:26 05:27 05:33 05:27 12:04 14:54 15:14 09:08 08:22 07:49 08:09 07:36 ROO Wall 06:33 06:52 05:59 05:33 09:08 10:14 07:29 08:55 08:22 07:56 08:09 08:22 ROO Dead-space 07:32 07:32 08:06 14:39 #N/A 15:07 11:26 10:27 #N/A 07:49 06:51 06:57 Table 44 Scenario 14a Time after ignition (min:sec) at which tenability limits were reached 1.5 metres
Test 1 activation times by alarm type and location
Figure 77 Scenario 14a, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 1 activation times by alarm type and location
Figure 78 Scenario 14a, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 2 activation times by alarm type and location
Figure 79 Scenario 14a, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Figure 80 Scenario 14a, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Figure 81 Scenario 14a, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 3 activation times by alarm type and location
Figure 82 Scenario 14a, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Table 45 Scenario 14a Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0
POSITION POSITION POSITION POSITION POSITION TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling #N/A #N/A #N/A #N/A 16.06 8.19 16.40 16.51 #N/A #N/A #N/A #N/A Hall Wall #N/A #N/A #N/A #N/A 16.29 9.94 16.94 16.83 #N/A #N/A #N/A #N/A Hall Dead-space #N/A #N/A #N/A #N/A 15.07 14.96 16.40 15.40 #N/A #N/A #N/A #N/A ROO Ceiling #N/A #N/A #N/A #N/A 13.78 10.95 10.62 16.72 #N/A #N/A #N/A #N/A ROO Wall #N/A #N/A #N/A #N/A 16.72 15.62 18.36 16.94 #N/A #N/A #N/A #N/A ROO Dead-space #N/A #N/A #N/A #N/A #N/A 10.73 14.42 15.40 #N/A #N/A #N/A #N/A Table 46 Scenario 14a atmospheric conditions
Test 1 Test 2 Test 3 Wind Speed (km/h) 0.63 0.68 0.27 Air Temp (°C) 17.84 15.91 14.86 Rel. Humidity (%) 56.53 72.40 73.21 Air Pressure (mbar) 1022.53 1022.35 1020.83 3.12 SCENARIO 14b: Smouldering lounge fire in lounge room, bedroom doors open
Figure 83 Before (left) and after (right) photographs of Scenario 14b, Tests 1 (top), 2 (middle) and 3 (bottom).
Table 47 Scenario 14b smoke alarm activation times (min:sec)
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling 09:44 11:04 10:30 09:30 20:46 22:11 19:09 20:01 10:02 10:22 10:35 09:49 Hall Wall 09:44 10:03 09:57 09:30 20:14 21:24 20:39 20:07 09:56 10:41 09:05 09:43 Hall Dead-space 10:17 11:04 10:50 10:17 20:39 22:11 17:01 20:39 10:35 10:54 11:33 10:28 ROO Ceiling 09:57 09:37 09:37 09:57 22:17 20:07 19:48 20:33 09:43 09:36 09:36 ROO Wall 09:44 09:57 09:37 09:37 21:58 21:31 21:31 21:24 09:24 09:36 10:08 09:43 ROO Dead-space 13:42 11:10 11:23 16:51 22:32 21:18 19:48 22:17 08:51 11:26 09:05 08:38 Table 48 Scenario 14b Time after ignition (min:sec) at which tenability limits were reached 1.5 metres
TEST 1 TEST 1 TEST 2 TEST 2 TEST 3 TEST 3 Bed1 Hall Bed1 Hall Bed1 Hall FEC IMPAIRED ESCAPE 0.3 01:58 22:28 06:07 00:35 07:04 01:44 FEC IMPAIRED ESCAPE 1.0 06:40 33:14 11:33 08:44 01:44 FEC INCAPACITATION 0.3 11:09 12:57 10:49 FEC INCAPACITATION 1.0 15:52 FED ASPHYXIATION 0.3 30:53 FED ASPHYXIATION 1.0 Test 1 activation times by alarm type and location
Figure 84 Scenario 14b, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 1 activation times by alarm type and location
Figure 85 Scenario 14b, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 2 activation times by alarm type and location
Figure 86 Scenario 14b, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 2 activation times by alarm type and location
Figure 87 Scenario 14b, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 3 activation times by alarm type and location
Figure 88 Scenario 14b, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 3 activation times by alarm type and location
Figure 89 Scenario 14b, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Table 49 Scenario 14b Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling #N/A #N/A #N/A #N/A -14.63 -16.05 -13.02 -13.88 3.52 3.19 2.97 3.73 Hall Wall #N/A #N/A #N/A #N/A -14.09 -15.27 -14.52 -13.98 3.62 2.87 4.47 3.84 Hall Dead-space #N/A #N/A #N/A #N/A -14.52 -16.05 -10.88 -14.52 2.97 2.65 2.00 3.08 ROO Ceiling #N/A #N/A #N/A #N/A -16.16 -13.98 -13.66 -14.41 3.84 #N/A 3.95 3.95 ROO Wall #N/A #N/A #N/A #N/A -15.83 -15.39 -15.39 -15.27 4.16 3.95 3.41 3.84 ROO Dead-space #N/A #N/A #N/A #N/A -16.39 -15.16 -13.66 -16.16 4.71 2.11 4.47 4.92 Table 50 Scenario 14b atmospheric conditions
Test 1 Test 2 Test 3 Wind Speed (km/h) 0.63 0.53 0.51 Air Temp (°C) 16.96 16.88 17.52 Rel. Humidity (%) 36.02 64.80 59.99 Air Pressure (mbar) 1019.81 1021.42 1018.51 3.13 SCENARIO 15: Flaming paper fire in lounge room, bedroom doors open
Figure 90 Before (left) and after (right) photographs of Scenario 15, Tests 1 (top), 2 (middle) and 3 (bottom).
Table 51 Scenario 15 smoke alarm activation times (min:sec)
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling 06:16 03:26 03:07 06:03 05:46 04:34 04:13 05:46 03:20 00:56 01:23 03:12 Hall Wall 06:03 03:07 02:54 05:57 05:52 04:13 03:34 06:52 03:20 00:56 01:23 03:12 Hall Dead-space 06:23 03:07 02:54 06:29 06:46 04:27 03:34 06:33 03:39 01:03 01:09 03:33 ROO Ceiling 02:35 01:02 03:00 02:35 03:15 01:10 02:28 02:54 02:31 00:23 00:23 02:19 ROO Wall 05:24 02:01 03:00 05:31 05:52 02:40 03:21 06:13 02:44 00:36 00:56 02:44 ROO Dead-space 01:02 01:22 02:35 01:16 01:16 05:00 00:23 00:23 02:04 Table 52 Scenario 15 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres
TEST 1 TEST 1 TEST 2 TEST 2 TEST 3 TEST 3 Bed1 Hall Bed1 Hall Bed1 Hall FEC IMPAIRED ESCAPE 0.3 04:03 01:29 00:47 00:00 04:31 00:27 FEC IMPAIRED ESCAPE 1.0 05:01 05:01 08:26 04:24 03:35 03:35 FEC INCAPACITATION 0.3 06:07 06:07 07:32 07:32 05:37 05:37 FEC INCAPACITATION 1.0 FED ASPHYXIATION 0.3 FED ASPHYXIATION 1.0 Test 1 activation times by alarm type and location
Figure 91 Scenario 15, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 2 activation times by alarm type and location
Figure 92 Scenario 15, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Figure 93 Scenario 15, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Figure 94 Scenario 15, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 3 activation times by alarm type and location
Figure 95 Scenario 15, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 3 activation times by alarm type and location
Figure 96 Scenario 15, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Table 53 Scenario 15 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling -0.16 2.68 3.00 0.06 1.77 2.96 3.31 1.77 2.29 4.68 4.23 2.41 Hall Wall 0.06 3.00 3.22 0.17 1.66 3.31 3.97 0.66 2.29 4.68 4.23 2.41 Hall Dead-space -0.27 3.00 3.22 -0.37 0.77 3.08 3.97 0.98 1.96 4.57 4.46 2.07 ROO Ceiling 3.54 5.08 3.12 3.54 4.29 6.37 5.07 4.64 3.09 5.24 5.24 3.31 ROO Wall 0.71 4.10 3.12 0.61 1.66 4.86 4.18 1.32 2.88 5.02 4.68 2.88 ROO Dead-space #N/A 5.08 4.75 3.54 #N/A 6.27 6.27 2.53 #N/A 5.24 5.24 3.55 Table 54 Scenario 15 atmospheric conditions
Test 1 Test 2 Test 3 Wind Speed (km/h) 0.36 0.18 0.27 Air Temp (°C) 14.82 12.51 13.86 Rel. Humidity (%) 79.04 84.18 77.91 Air Pressure (mbar) 1024.35 1022.20 1022.01 3.14 SCENARIO 16: Flaming chair fire in lounge, bedroom doors open
Figure 97 Before (left) and after (right) photographs of Scenario 16, Tests 1 (top), 2 (middle) and 3 (bottom).
Table 55 Scenario 16 smoke alarm activation times (min:sec)
TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling 05:53 04:47 07:15 05:11 05:30 04:32 Hall Wall 05:00 04:28 06:29 05:17 05:24 03:39 Hall Dead-space 05:20 04:02 06:15 05:30 05:04 03:59 ROO Ceiling 03:03 03:56 09:05 04:25 04:32 03:06 02:14 02:34 ROO Wall 03:03 03:17 04:51 05:17 02:41 03:20 ROO Dead-space 02:16 02:23 01:12 01:18 02:00 02:14 Table 56 Scenario 16 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres
TEST 1 TEST 1 TEST 2 TEST 2 TEST 3 TEST 3 Bed1 Hall Bed1 Hall Bed1 Hall FEC IMPAIRED ESCAPE 0.3 04:57 00:08 FEC IMPAIRED ESCAPE 1.0 FEC INCAPACITATION 0.3 FEC INCAPACITATION 1.0 FED ASPHYXIATION 0.3 FED ASPHYXIATION 1.0 Figure 98 Scenario 16, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Figure 99 Scenario 16, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Figure 100 Scenario 16, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Figure 101 Scenario 16, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 3 activation times by alarm type and location
Figure 102 Scenario 16, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 3 activation times by alarm type and location
Figure 103 Scenario 16, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Table 57 Scenario 16 atmospheric conditions
Test 1 Test 2 Test 3 Wind Speed (km/h) 0.75 0.78 0.53 Air Temp (°C) 16.70 18.04 15.29 Rel. Humidity (%) 51.13 52.03 75.26 Air Pressure (mbar) 1024.40 1023.33 1023.79 3.15 SCENARIO 17: Flaming cooking oil fire in kitchen, bedroom doors open
Figure 104 Before (left) and during (right) photographs of Scenario 17, Tests 1 (top), 2 (middle) and 3 (bottom).
Table 58 Scenario 17 smoke alarm activation times (min:sec) in the Hallway and Lounge room
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling 11:06 08:20 06:49 11:06 07:13 07:00 06:33 07:00 08:59 09:36 10:14 08:32 Hall Wall 10:53 08:07 06:09 11:00 06:46 06:33 06:40 06:40 07:54 09:30 08:20 Hall Dead-space 11:40 08:46 05:56 11:47 08:20 08:06 07:40 08:13 10:01 07:48 09:24 ROO Ceiling 09:40 05:50 04:30 09:40 05:40 06:07 05:40 05:34 05:01 05:59 04:41 05:40 ROO Wall 10:47 05:03 05:03 10:40 07:20 07:27 06:33 06:46 07:22 07:22 06:44 07:22 ROO Dead-space 14:51 10:40 10:08 12:15 10:06 05:00 05:40 08:00 09:12 10:58 11:11 09:05 Table 59 Scenario 17 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres
TEST 1 TEST 1 TEST 2 TEST 2 TEST 3 TEST 3 Bed1 Hall Bed1 Hall Bed1 Hall FEC IMPAIRED ESCAPE 0.3 12:36 01:40 05:32 00:30 06:45 10:13 FEC IMPAIRED ESCAPE 1.0 16:23 16:23 13:25 13:25 FEC INCAPACITATION 0.3 13:25 13:25 FEC INCAPACITATION 1.0 FED ASPHYXIATION 0.3 FED ASPHYXIATION 1.0 Test 1 activation times by alarm type and location.
Figure 105 Scenario 17, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 1 activation times by alarm type and location
Figure 106 Scenario 17, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 2 activation times by alarm type and location
Figure 107 Scenario 17, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 2 activation times by alarm type and location
Figure 108 Scenario 317, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 3 activation times by alarm type and location
Figure 109 Scenario 17, Test 3 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Test 3 activation times by alarm type and location
Figure 110 Scenario 17, Test 3 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Table 60 Scenario 17 Available Safe Egress Times (ASETs) in minutes for individual smoke alarms according to Hallway tenability limits. Note: ASET≤0 is no ASET, 0
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling #N/A #N/A #N/A #N/A 6.20 6.42 6.87 6.42 #N/A #N/A #N/A #N/A Hall Wall #N/A #N/A #N/A #N/A 6.65 6.87 6.76 6.76 #N/A #N/A #N/A #N/A Hall Dead-space #N/A #N/A #N/A #N/A 5.09 5.31 5.75 5.20 #N/A #N/A #N/A #N/A ROO Ceiling #N/A #N/A #N/A #N/A 7.75 7.30 7.75 7.86 #N/A #N/A #N/A #N/A ROO Wall #N/A #N/A #N/A #N/A 6.09 5.96 6.87 6.65 #N/A #N/A #N/A #N/A ROO Dead-space #N/A #N/A #N/A #N/A 3.32 8.42 7.75 5.42 #N/A #N/A #N/A #N/A Table 61 Scenario 17 atmospheric conditions
Test 1 Test 2 Test 3 Wind Speed (km/h) 0.51 0.46 0.89 Air Temp (°C) 20.88 20.58 16.36 Rel. Humidity (%) 27.80 43.22 42.36 Air Pressure (mbar) 1009.27 1012.55 1002.51 3.16 SCENARIO 18: Flaming tea towel fire in kitchen, bedroom doors open
Figure 111 Images of Scenario 18, Tests 1 (top), 2 (middle) and 3 (bottom).
Table 62 Scenario 18 smoke alarm activation times (min:sec) in the Hallway and Lounge room
TEST 1 TEST 1 TEST 1 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 TEST 3 TEST 3 TEST 3 TEST 3 POSITION Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Photo-electric Ionisation Dual Multi Hall Ceiling 01:37 01:57 02:38 01:44 01:58 02:12 06:58 02:05 02:32 05:57 Hall Wall 06:55 02:39 02:45 02:19 01:51 01:58 02:19 05:44 02:12 02:12 05:57 Hall Dead-space 01:37 01:37 02:52 01:51 02:19 03:00 06:51 02:19 02:26 07:11 ROO Ceiling 00:22 00:22 00:16 00:22 00:57 00:50 00:50 00:57 01:32 01:38 01:38 ROO Wall 00:43 01:17 01:44 01:17 01:10 01:44 06:58 01:38 01:59 06:37 ROO Dead-space 00:43 00:43 01:31 02:45 01:31 01:52 01:52 Table 63 Scenario 18 Time after ignition (min:sec) at which tenability limits were reached 1.5 metres
Figure 112 Scenario 18, Test 1 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Figure 113 Scenario 18, Test 1 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.
Figure 114 Scenario 18, Test 2 smoke alarm activation times by type in comparison with calculated Bedroom 1 FECs for impaired escape and incapacitation, and asphyxiation FED.
Figure 115 Scenario 18, Test 2 smoke alarm activation times by type in comparison with calculated Hallway FECs for impaired escape and incapacitation, and asphyxiation FED.