06_境外及港澳台调查报告_part01.md
06_境外及港澳台调查报告 · 整合分片 part01
本片含 189 份报告。
| FD06029 | 2024_美国_NIOSH_face202402.pdf | 2024 | ||||
| FD06030 | 2024_美国_NIOSH_face202403.pdf | 2024 | ||||
| FD06031 | 2024_美国_NIOSH_face202404.pdf | 2024 | ||||
| FD06032 | 2024_美国_NIOSH_face202405.pdf | 2024 | ||||
| FD06033 | 2024_美国_NIOSH_face202406.pdf | 2024 | ||||
| FD06034 | 2025_美国_NIOSH_face202502.pdf | 2025 | ||||
| FD06035 | 2025_美国_NIOSH_face202503.pdf | 2025 | ||||
| FD06036 | 2026_美国国家消防协会_曼哈顿单楼梯公寓火灾调查报告(英文).md | 2026 | ||||
| FD06037 | 2004_英国_fire-in-the-engine-room-on-the-suction-dredger-arco-avon-with-loss-of-1-life__ArcoAvon_Com.pdf | 2004 | ||||
| FD06038 | 2010_英国_MAIB_man-overboard-from-twin-rig-trawler-aquarius-with-loss-of-1-life__Aquarius_CombinedAnnexes.pdf | 2010 | ||||
| FD06039 | 2011_英国_MAIB_gas-explosions-on-general-cargo-ship-nortrader-with-1-person-injured__Nortrader_CombinedAn.pdf | 2011 | ||||
| FD06040 | 2012_英国_carbon-monoxide-poisoning-on-board-the-sports-cruiser-emma-louise-with-loss-of-2-lives__20.pdf | 2012 | ||||
| FD06041 | 2012_英国_carbon-monoxide-poisoning-on-motor-cruiser-vasquez-with-loss-of-1-life__MAIBInvReport-18_2.pdf | 2012 | ||||
| FD06042 | 2012_英国_catastrophic-engine-failure-and-fire-on-board-ro-ro-passenger-ferry-wight-sky__MAIBInvRepo.pdf | 2012 | ||||
| FD06043 | 2012_英国_catastrophic-engine-failure-and-subsequent-fire-on-board-the-site-investigation-vessel-kom.pdf | 2012 | ||||
| FD06044 | 2012_英国_catastrophic-engine-failure-resulting-in-a-fire-on-crew-transfer-vessel-windcat-8__MAIBInv.pdf | 2012 | ||||
| FD06045 | 2012_英国_fire-on-board-fishing-trawler-ardent-ii-resulting-in-extensive-damage__MAIBInvReport12_201.pdf | 2012 | ||||
| FD06046 | 2015_英国_fire-in-the-engine-room-on-the-suction-dredger-arco-avon-with-loss-of-1-life__MAIBInvRepor.pdf | 2015 | ||||
| FD06047 | 2016_英国_flooding-and-sinking-of-the-wooden-potter-majestic__MAIBInvReport_16_2016.pdf | 2016 | ||||
| FD06048 | 2016_英国_man-overboard-from-twin-rig-trawler-aquarius-with-loss-of-1-life__MAIBInvReport18_2016.pdf | 2016 | ||||
| FD06049 | 2017_英国_gas-explosions-on-general-cargo-ship-nortrader-with-1-person-injured__MAIBInvReport26_2017.pdf | 2017 | ||||
| FD06050 | 2017_英国_man-overboard-from-ocean-rowing-boat-toby-wallace-with-loss-of-1-life__MAIBInvReport2_2017.pdf | 2017 | ||||
| FD06051 | 2017_英国_safety-warning-after-explosion-on-container-vessel-manhattan-bridge-results-in-1-fatality.pdf | 2017 | ||||
| FD06052 | 2017_英国_sinking-of-vivier-creel-boat-louisa-with-loss-of-3-lives__MAIBInvReport17_2017.pdf | 2017 | ||||
| FD06053 | 2018_英国_MAIB_entry-to-enclosed-space-on-fishing-vessel-sunbeam-with-loss-of-1-life__Sunbeam_CombinedAnn.pdf | 2018 | ||||
| FD06054 | 2018_英国_MAIB_two-catastrophic-engine-failures-one-resulting-in-a-fire-on-board-ro-ro-passenger-ferry-wight-sky__WightSky-Annexes.pdf.pdf | 2018 | ||||
| FD06055 | 2018_英国_capsize-and-sinking-of-fishing-vessel-solstice-with-loss-of-1-life_2018-20-_Solstice_A.pdf | 2018 | ||||
| FD06056 | 2018_英国_engine-failure-and-subsequent-fire-on-ro-ro-cargo-vessel-finlandia-seaways-with-1-person-i.pdf | 2018 | ||||
| FD06057 | 2018_英国_unintentional-release-of-carbon-dioxide-from-fixed-fire-extinguishing-systems-on-ro-ro-vessels-eddystone-and-red-eagle_2018-16-_Eddystone_and_Red_Eagle.pdf.pdf | 2018 | ||||
| FD06058 | 2018_英国_unintentional-release-of-carbon-dioxide-from-fixed-fire-extinguishing-systems-on-ro-ro-vessels-eddystone-and-red-eagle_2018-16-_Eddystone_and_Red_Eagle_Annexes.pdf.pdf | 2018 | ||||
| FD06059 | 2019_英国_explosion-and-fire-on-chemical-tanker-stolt-groenland__InterimReport201912-StoltGroenland.pdf | 2019 | ||||
| FD06060 | 2019_英国_safety-warning-about-drivers-remaining-in-vehicle-cabs-while-ferries-are-at-sea_2019-_SB.pdf | 2019 | ||||
| FD06061 | 2019_英国_two-catastrophic-engine-failures-one-resulting-in-a-fire-on-board-ro-ro-passenger-ferry-wight-sky__2019-InterimReport-WightSky.pdf.pdf | 2019 | ||||
| FD06062 | 2020_英国_collision-between-2-fire-and-rescue-service-boats-with-loss-of-1-life__2020-17-FRSRIBs.pdf | 2020 | ||||
| FD06063 | 2020_英国_grounding-and-recovery-of-container-feeder-vessel-thea-ii-and-tug-svitzer-josephine__2020.pdf | 2020 | ||||
| FD06064 | 2020_英国_man-overboard-from-dredger-cherry-sand-with-loss-of-1-life__2020-9-CherrySand-Annexes.pdf | 2020 | ||||
| FD06065 | 2020_英国_safety-warning-about-carbon-monoxide-poisoning-after-the-loss-of-2-lives-on-the-motor-crui.pdf | 2020 | ||||
| FD06066 | 2020_英国_safety-warning-after-inadvertent-activation-of-condensed-aerosol-fire-extinguishing-system.pdf | 2020 | ||||
| FD06067 | 2020_英国_subsea-explosion-resulting-in-damage-to-crab-potting-vessel-galwad-y-mor-and-injuries-to-c.pdf | 2020 | ||||
| FD06068 | 2021_英国_carbon-monoxide-poisoning-on-motor-cruiser-diversion-with-loss-of-2-lives__2021-03-Diversi.pdf | 2021 | ||||
| FD06069 | 2021_英国_cargo-tank-explosion-and-fire-on-chemical-tanker-stolt-groenland__2021-09-StoltGroenland-R.pdf | 2021 | ||||
| FD06070 | 2021_英国_crush-incident-on-scallop-dredger-olivia-jean-with-loss-of-1-life__2021-05-OliviaJean-Anne.pdf | 2021 | ||||
| FD06071 | 2022_英国_person-overboard-from-motor-cruiser-diamond-emblem-1-with-loss-of-1-life__2022-5-DiamondEm.pdf | 2022 | ||||
| FD06072 | 2022_英国_safety-warning-issued-after-discovery-of-blocked-fixed-co2-fire-extinquishing-system-pilot.pdf | 2022 | ||||
| FD06073 | 2022_英国_two-catastrophic-engine-failures-one-resulting-in-a-fire-on-board-ro-ro-passenger-ferry-wight-sky__2022-4-WightSky-Report.pdf.pdf | 2022 | ||||
| FD06074 | 2023_英国_accidental-discharge-of-condensed-aerosol-fire-extinguishing-system-on-beam-trawler-resurgam-with-loss-of-1-life__2023-9-Resurgam-Annexes.pdf.pdf | 2023 | ||||
| FD06075 | 2023_英国_accidental-discharge-of-condensed-aerosol-fire-extinguishing-system-on-beam-trawler-resurgam-with-loss-of-1-life__2023-9-Resurgam-Report.pdf.pdf | 2023 | ||||
| FD06076 | 2023_英国_safety-warning-issued-about-the-hazards-of-flexible-hose-installations__2023-SB1_Finnmaste.pdf | 2023 | ||||
| FD06077 | 2024_英国_fall-from-height-on-bulk-carrier-equinox-seas-with-loss-of-1-life__2024-12-EquinoxSeas-Rep.pdf | 2024 | ||||
| FD06078 | 2024_英国_man-overboard-from-potting-vessel-pioneer-with-loss-of-1-life__2024-19-Pioneer.pdf | 2024 | ||||
| FD06079 | 2025_英国_accident-to-chief-engineer-on-board-motor-yacht-baton-rouge-with-loss-of-1-life__2025-1-Ba.pdf | 2025 | ||||
| FD06080 | 2025_英国_auxiliary-engine-room-fire-on-board-the-ro-ro-cargo-ship-finnmaster__2025-13-Finnmaster-Re.pdf | 2025 | ||||
| FD06081 | 2025_英国_safety-warning-issued-following-egyptian-liveaboard-dive-boat-accidents-in-the-red-sea-res.pdf | 2025 | ||||
| FD06082 | 2025_英国_swamping-of-small-commercial-vessel-calypso-2-with-loss-of-2-lives__2025-6-Calypso2-Report.pdf | 2025 | ||||
| FD06083 | 2026_英国_serious-injury-to-a-crew-member-on-board-the-scallop-dredger-jacoba-bm77__2026-14-Jacoba-R.pdf | 2026 | ||||
| FD06084 | 1998_加拿大运输安全委员会_Propair_SA226-TC轮舱起火坠毁_A98Q0087_火灾报告(英文).md | 1998 | 燃气/爆炸 | |||
| FD06085 | 1999_加拿大_TSBC_R99T0031_CN_Derailment_Fire_Benzene_Neswabin_Ontario_1999.pdf | 1999 | ||||
| FD06086 | 1999_加拿大运输安全委员会_CN苯罐车脱轨起火_R99T0031_火灾报告(英文).md | 1999 | 燃气/爆炸 | |||
| FD06087 | 2002_加拿大运输安全委员会_加拿大航空_B767后货舱起火_A02O0123_火灾报告(英文).md | 2002 | ||||
| FD06088 | 2005_加拿大运输安全委员会_阿拉斯加_B737-900右发动机尾管起火撤离_A05W0222_火灾报告(英文).md | 2005 | ||||
| FD06089 | 2009_加拿大_TSBC_R09H0010_Locomotive_Engine_Fire_VIA_Rail_Richmond_2009.pdf | 2009 | ||||
| FD06090 | 2009_加拿大运输安全委员会_维亚铁路客运列车机车柴油引擎起火_R09H0010_火灾报告(英文).md | 2009 | 交通/车辆 | 燃气/爆炸 | ||
| FD06091 | 2012_加拿大运输安全委员会_派珀_PA-34右发动机失效起火迫降_Victoriaville_A12Q0182_火灾报告(英文).md | 2012 | 焊接/动火 | |||
| FD06092 | 2012_加拿大运输安全委员会_派珀_PA-34右发动机空中起火迫降_A12Q0182_火灾报告(英文).md | 2012 | ||||
| FD06093 | 2013_加拿大运输安全委员会_Buffalo_DC-3C右发动机起飞后起火_A13W0120_火灾报告(英文).md | 2013 | ||||
| FD06094 | 2013_加拿大运输安全委员会_CN原油液化石油气脱轨起火_盖恩福德_R13E0142_火灾报告(英文).md | 2013 | ||||
| FD06095 | 2013_加拿大运输安全委员会_摩洛哥皇家航空_B767传送带起火撤离_A13Q0186_火灾报告(英文).md | 2013 | ||||
| FD06096 | 2013_加拿大运输安全委员会_梅干提克湖镇_MMA5017机车引擎火灾实验室报告_LP181_火灾报告(英文).md | 2013 | ||||
| FD06097 | 2013_加拿大运输安全委员会_梅干提克湖镇失控脱轨原油起火47死_R13D0054_火灾报告(英文).md | 2013 | 燃气/爆炸 | |||
| FD06098 | 2014_加拿大运输安全委员会_CN货运列车脱轨危险货物起火_R14W0256_火灾报告(英文).md | 2014 | 交通/车辆 | 燃气/爆炸;焊接/动火;纵火 | ||
| FD06099 | 2014_加拿大运输安全委员会_庞巴迪_CS100涡轮转子非包容性失效起火_A14Q0068_火灾报告(英文).md | 2014 | ||||
| FD06100 | 2015_加拿大_TSBC_R15H0013_CN_Crude_Oil_Derailment_Fire_Gladwick_Ontario_2015.pdf | 2015 | ||||
| FD06101 | 2015_加拿大_TSBC_R15H0021_Crude_Oil_Derailment_Fire_Gogama_Ontario_2015.pdf | 2015 | ||||
| FD06102 | 2015_加拿大运输安全委员会_CN原油单元列车脱轨五日大火_戈加马_R15H0013_火灾报告(英文).md | 2015 | 交通/车辆 | 燃气/爆炸;焊接/动火 | ||
| FD06103 | 2015_加拿大运输安全委员会_CN原油单元列车脱轨起火_戈加马_R15H0021_火灾报告(英文).md | 2015 | 交通/车辆 | 燃气/爆炸 | ||
| FD06104 | 2018_加拿大_TSBC_R18E0138_Rail_Fire_Investigation_2018.pdf | 2018 | ||||
| FD06105 | 2018_加拿大_TSBC_R18T0006_Rail_Fire_Investigation_2018.pdf | 2018 | ||||
| FD06106 | 2018_加拿大运输安全委员会_商船三井_Prestige机舱起火_M18P0014_火灾报告(英文).md | 2018 | 燃气/爆炸 | |||
| FD06107 | 2018_加拿大运输安全委员会_西捷航空_B737行李舱锂电池起火_A18W0081_火灾报告(英文).md | 2018 | 电动车/电池 | 燃气/爆炸;锂电池热失控 | ||
| FD06108 | 2018_加拿大运输安全委员会_西捷航空_Encore_DHC-8-402座舱冒烟_A18P0042_火灾报告(英文).md | 2018 | 燃气/爆炸 | |||
| FD06109 | 2018_加拿大运输安全委员会_西捷航空_阳翼航空地面相撞起火撤离_A18O0002_火灾报告(英文).md | 2018 | ||||
| FD06110 | 2019_加拿大_TSBC_R19C0015_Rail_Fire_Investigation_2019.pdf | 2019 | ||||
| FD06111 | 2019_加拿大运输安全委员会_CP原油单元列车脱轨起火_格恩西_R19W0320_火灾报告(英文).md | 2019 | 交通/车辆 | 燃气/爆炸 | ||
| FD06112 | 2020_加拿大_TSBC_R20W0025_Crude_Oil_Derailment_Fire_Guernsey_Saskatchewan_2020.pdf | 2020 | ||||
| FD06113 | 2020_加拿大运输安全委员会_CP原油单元列车脱轨池火_R20W0025_火灾报告(英文).md | 2020 | 交通/车辆 | 燃气/爆炸 | ||
| FD06114 | 2021_加拿大_TSBC_A21C0052_Aviation_Pipeline_Inspection_Fire_2021.pdf | 2021 | ||||
| FD06115 | 2021_加拿大_TSBC_R21C0070_Grass_Fire_Right-of-Way_CN_Calgary_2021.pdf | 2021 | ||||
| FD06116 | 2021_加拿大_TSBC_R21V0144_Locomotive_Engine_Fire_CP_Railway_Elko_BC_2021.pdf | 2021 | ||||
| FD06117 | 2021_加拿大运输安全委员会_CP机车引擎起火引燃路旁植被_埃尔科_R21V0144_火灾报告(英文).md | 2021 | ||||
| FD06118 | 2022_加拿大_TSBC_A22Q0116_Aviation_Wing_Separation_Fire_2022.pdf | 2022 | ||||
| FD06119 | 2022_加拿大_TSBC_M22A0258_Engine_Room_Fire_Ferry_Holiday_Island_PE_2022.pdf | 2022 | ||||
| FD06120 | 2022_加拿大运输安全委员会_Holiday_Island渡轮机舱起火_M22A0258_火灾报告(英文).md | 2022 | 燃气/爆炸 | |||
| FD06121 | 2023_加拿大_TSBC_M23C0104_Engine_Room_Fire_Bulk_Carrier_Cuyahoga_Lake_Erie_2023.pdf | 2023 | ||||
| FD06122 | 2023_加拿大运输安全委员会_凯霍加机舱起火_M23C0104_火灾报告(英文).md | 2023 | 燃气/爆炸 | |||
| FD06123 | 2024_加拿大_TSBC_M24A0269_Fire_Abandonment_Fishing_Vessel_Elite_Navigator_2024.pdf | 2024 | ||||
| FD06124 | 2024_加拿大运输安全委员会_塞斯纳_421C右发动机起火撞后火灾_A24P0074_火灾报告(英文).md | 2024 | 燃气/爆炸 | |||
| FD06125 | 2016_西班牙_MITECO_森林火灾年报_火灾报告.pdf | 2016 | ||||
| FD06126 | 2017_西班牙_MITECO_森林火灾年报_火灾报告.pdf | 2017 | ||||
| FD06127 | 2018_西班牙_MITECO_森林火灾年报_火灾报告.pdf | 2018 | ||||
| FD06128 | 2020_西班牙_MITECO_林火夏季战役通报_火灾报告.pdf | 2020 | ||||
| FD06129 | 1990_港澳台_香港_擅离职守最终沦为囚徒_10·10_火灾_调查报告.md | 1990 | 香港 | 电气 | ||
| FD06130 | 1990_港澳台_香港_擅离职守沦为囚徒_10·10_火灾_调查报告.md | 1990 | 香港 | 电气 | ||
| FD06131 | 1995_台湾_台中衛爾康西餐廳大火_監察院糾正彈劾案文.pdf | 1995 | 台湾 | |||
| FD06132 | 1996_港澳台_香港_嘉利大厦大火_政府回应调查委员会最后报告书.md | 1996 | 香港 | |||
| FD06133 | 1997_港澳台_香港_政府新闻公报_嘉利大厦大火调查委员会最后报告书.md | 1997 | 香港 | |||
| FD06134 | 1998_台湾_台北县中和客来美卡拉OK火灾_监察院纠正案文.md | 1998 | 台湾 | |||
| FD06135 | 2001_港澳台_Corus_Port_Talbot_blast_furnace_explosion_2001.pdf | 2001 | ||||
| FD06136 | 2003_港澳台_澳门_青洲区油气库爆炸大火_消防局原因说明.md | 2003 | 澳门 | 燃气/爆炸 | ||
| FD06137 | 2004_台湾_监察院火灾专案调查报告_093内调0169.pdf | 2004 | 台湾 | |||
| FD06138 | 2004_港澳台_澳门_华榕大厦火警云梯车故障事件_消防局调查报告撮要.md | 2004 | 澳门 | 纵火 | ||
| FD06139 | 2007_港澳台_厦门香港广场工程5·14火灾事故通报.md | 2007 | 厦门 | 焊接/动火 | ||
| FD06140 | 2008_台湾_台大医院火灾_监察院纠正案文.pdf | 2008 | 台湾 | 医院/养老院 | 焊接/动火 | |
| FD06141 | 2008_港澳台_香港_立法会_嘉禾大厦火灾后食物业消防安全规管_讨论文件.pdf | 2008 | 香港 | |||
| FD06142 | 2008_港澳台_香港_立法会_嘉禾大厦火灾后食物业消防安全规管_资料摘要.pdf | 2008 | 香港 | |||
| FD06143 | 2010_港澳台_香港_福州市马尾高福纺织火灾_火灾_调查报告.md | 2010 | 福州 | 电气;吸烟;焊接/动火;危化/自燃;纵火 | ||
| FD06144 | 2011_台湾_台中阿拉夜店火灾_监察院弹劾案文.pdf | 2011 | 台湾 | 焊接/动火 | ||
| FD06145 | 2011_台湾_台中阿拉夜店火灾_监察院调查报告.pdf | 2011 | 台湾 | |||
| FD06146 | 2011_台湾_桃园万达爆竹工厂爆炸新北新兴堂香铺爆炸_监察院弹劾案文.pdf | 2011 | 台湾 | 厂房/车间 | 燃气/爆炸 | |
| FD06147 | 2011_港澳台_澳门_雅廉访大马路31号诚信大厦火警_消防局调查结果.md | 2011 | 澳门 | 电气 | ||
| FD06148 | 2011_港澳台_香港_立法会_花园街排档火灾后小贩摊档管理及消防安全.pdf | 2011 | 香港 | |||
| FD06149 | 2012_台湾_台南新營北門醫院火災_監察院糾正案文.pdf | 2012 | 台湾 | |||
| FD06150 | 2012_台湾_台南新營北門醫院火災_監察院調查報告.pdf | 2012 | 台湾 | |||
| FD06151 | 2013_台湾_新竹新埔镇住宅火警_监察院纠正案文.pdf | 2013 | 台湾 | 住宅/民房 | 电气;纵火 | |
| FD06153 | 2013_港澳台_香港_立法会_花园街火灾后小贩发牌政策检讨.pdf | 2013 | 香港 | |||
| FD06154 | 2015_台湾_八仙乐园粉尘暴燃事件_监察院调查报告.pdf | 2015 | 台湾 | 燃气/爆炸 | ||
| FD06155 | 2015_台湾_桃园中坜工业区敬达工厂火灾_监察院纠正案文.pdf | 2015 | 台湾 | 厂房/车间 | 燃气/爆炸;焊接/动火 | |
| FD06156 | 2015_台湾_桃园新屋保龄球馆火灾_监察院纠正案文.pdf | 2015 | 台湾 | |||
| FD06157 | 2015_台湾_桃园新屋保龄球馆火灾_监察院调查报告.pdf | 2015 | 台湾 | |||
| FD06158 | 2015_香港_立法会_se20160301cb2-1369-1-c.p_政府當局就2015年9月27日於筲箕灣避風塘發生的三級船火作出的回應.pdf | 2015 | 香港 | |||
| FD06159 | 2015_香港_立法会_secb2-29-1-c.pdf_政府當局就鍾樹根議員與何俊賢議員於2015年9月29日的聯署函件所提有關於201.pdf | 2015 | 香港 | |||
| FD06160 | 2016_台湾_新北新店樂活老人長照中心火災_監察院糾正案文.pdf | 2016 | 台湾 | |||
| FD06161 | 2016_台湾_新北新店樂活老人長照中心火災_監察院調查報告.pdf | 2016 | 台湾 | |||
| FD06162 | 2016_港澳台_COMAH_performance_report_2016-17.pdf | 2016 | ||||
| FD06163 | 2016_港澳台_香港_立法会_淘大工业村迷你仓火灾后旧式工业大厦消防安全立法建议.pdf | 2016 | 香港 | |||
| FD06165 | 2016_香港_立法会_CB2-1849-1516-01_牛頭角道工業大廈四級火警跟進.pdf | 2016 | 香港 | |||
| FD06166 | 2016_香港_立法会_CB2-1849-1516-02_迷你倉事宜背景資料簡介.pdf | 2016 | 香港 | |||
| FD06167 | 2016_香港_立法会_secb2-1354-1-c.pdf_蔣麗芸議員於2016年4月21日建議事務委員會討論2016年4月19日在灣仔發生.pdf | 2016 | 香港 | |||
| FD06168 | 2016_香港_立法会_旧式工业大厦及迷你仓消防安全_背景资料简介.pdf | 2016 | 香港 | |||
| FD06169 | 2016_香港_立法会_牛头角迷你仓四级火警_政府跟进工作.pdf | 2016 | 香港 | |||
| FD06170 | 2017_台湾_住宅用火災警報器推广设置案_监察院调查报告.pdf | 2017 | 台湾 | 住宅/民房 | 焊接/动火 | |
| FD06171 | 2017_台湾_淮南经济技术开发区2017·2·16_17·2_较大_火灾_调查报告.md | 2017 | 台湾 | 电气;用火不慎;吸烟;危化/自燃;纵火;锂电池热失控 | ||
| FD06172 | 2018_台湾_中油桃園煉油廠氣爆火警_監察院糾正案文.pdf | 2018 | 台湾 | 燃气/爆炸 | ||
| FD06174 | 2018_台湾_台北醫院護理之家大火_監察院糾正案文.pdf | 2018 | 台湾 | 电气 | ||
| FD06175 | 2018_台湾_桃园敬鹏工厂火灾_监察院纠正案文.pdf | 2018 | 台湾 | 厂房/车间 | ||
| FD06176 | 2018_台湾_桃园敬鹏工厂火灾_监察院调查报告.pdf | 2018 | 台湾 | 厂房/车间 | 电气 | |
| FD06177 | 2019_台湾_台中大雅違章工廠火災_監察院糾正案文.pdf | 2019 | 台湾 | |||
| FD06178 | 2019_港澳台_澳门_广福祥花园第四座火警_消防局调查结果.md | 2019 | 澳门 | 燃气/爆炸 | ||
| FD06179 | 2019_港澳台_澳门_廉政公署_青洲坊大厦防火卷闸调查报告.md | 2019 | 澳门 | 焊接/动火 | ||
| FD06180 | 2020_台湾_台中大雅农地违章工厂火灾_监察院纠正案文.pdf | 2020 | 台湾 | 厂房/车间 | ||
| FD06182 | 2021_台湾_彰化乔友大楼火警_监察院纠正案文.pdf | 2021 | 台湾 | 燃气/爆炸 | ||
| FD06183 | 2021_台湾_彰化乔友大楼火警_监察院调查报告.pdf | 2021 | 台湾 | 燃气/爆炸 | ||
| FD06184 | 2021_台湾_高雄城中城大楼火灾_监察院纠正案文.pdf | 2021 | 台湾 | |||
| FD06185 | 2021_台湾_高雄城中城大楼火灾_监察院调查报告.pdf | 2021 | 台湾 | |||
| FD06186 | 2022_台湾_台中興中街住宅縱火6死_監察院糾正案文.pdf | 2022 | 台湾 | 住宅/民房 | ||
| FD06187 | 2022_台湾_台中興中街住宅縱火6死_監察院調查報告.pdf | 2022 | 台湾 | 住宅/民房 | ||
| FD06188 | 2022_港澳台_香港_营口6·21BONNYISLAND_6·21_火灾_调查报告.md | 2022 | 香港 | |||
| FD06189 | 2023_台湾_屏东明扬工厂大火气爆_监察院纠正案文.pdf | 2023 | 台湾 | 厂房/车间 | 燃气/爆炸 | |
| FD06190 | 2023_台湾_彰化联华食品厂火灾_监察院纠正案文.pdf | 2023 | 台湾 | |||
| FD06191 | 2023_台湾_桃園工廠倉儲未列管案_監察院糾正案文.pdf | 2023 | 台湾 | |||
| FD06192 | 2024_台湾_屏东东港安泰医院火灾_监察院纠正案文.pdf | 2024 | 台湾 | 医院/养老院 | 电气 | |
| FD06193 | 2024_台湾_桃園大園鋰電池倉儲大火_監察院糾正案文.pdf | 2024 | 台湾 | 电气 | ||
| FD06194 | 2024_港澳台_MethodologyForFireLoss.pdf | 2024 | ||||
| FD06195 | 2025_港澳台_香港_宏福苑大火_新闻公报_20251202.md | 2025 | 香港 | 焊接/动火 | ||
| FD06196 | 2025_港澳台_香港_宏福苑大火_新闻公报_20251212a.md | 2025 | 香港 | 焊接/动火 | ||
| FD06197 | 2025_港澳台_香港_宏福苑大火_新闻公报_20251212b.md | 2025 | 香港 | 焊接/动火 | ||
| FD06198 | 2025_港澳台_香港_宏福苑大火_新闻公报_20251212c.md | 2025 | 香港 | 焊接/动火 | ||
| FD06199 | 2025_港澳台_香港_宏福苑大火_新闻公报_20251219.md | 2025 | 香港 | 焊接/动火 | ||
| FD06200 | 2025_港澳台_香港_宏福苑大火_新闻公报_20251223.md | 2025 | 香港 | 焊接/动火 | ||
| FD06201 | 2025_港澳台_香港_宏福苑大火_新闻公报_20260112.md | 2025 | 香港 | |||
| FD06202 | 2025_港澳台_香港_宏福苑大火_新闻公报_20260114.md | 2025 | 香港 | |||
| FD06203 | 2025_港澳台_香港_宏福苑大火_新闻公报_20260120.md | 2025 | 香港 | |||
| FD06204 | 2025_港澳台_香港_宏福苑大火_新闻公报_20260121.md | 2025 | 香港 | |||
| FD06205 | 2025_港澳台_香港_宏福苑大火_新闻公报_20260126.md | 2025 | 香港 | |||
| FD06206 | 2025_港澳台_香港_宏福苑大火_新闻公报_20260303.md | 2025 | 香港 | |||
| FD06207 | 2025_港澳台_香港_宏福苑大火_新闻公报_20260323.md | 2025 | 香港 | |||
| FD06208 | 2025_港澳台_香港_宏福苑大火_新闻公报_20260330.md | 2025 | 香港 | |||
| FD06209 | 2025_港澳台_香港_宏福苑大火_新闻公报_20260402.md | 2025 | 香港 | |||
| FD06210 | 2025_港澳台_香港_宏福苑大火_新闻公报_20260421.md | 2025 | 香港 | |||
| FD06211 | 2025_港澳台_香港_宏福苑大火_新闻公报_20260605.md | 2025 | 香港 | |||
| FD06212 | 2025_港澳台_香港_宏福苑大火_新闻公报_20260622.md | 2025 | 香港 | |||
| FD06213 | 2025_港澳台_香港_宏福苑大火_新闻公报_20260702.md | 2025 | 香港 | |||
| FD06214 | 2025_港澳台_香港大埔宏福苑-特别重大火灾事故调查报告(ISS物业结案陈词).pdf | 2025 | 香港 | 特别重大 | ||
| FD06215 | 2025_港澳台_香港大埔宏福苑-特别重大火灾事故调查报告(业主立案法团回应).pdf | 2025 | 香港 | 特别重大 | ||
| FD06216 | 2025_港澳台_香港大埔宏福苑-特别重大火灾事故调查报告(业主立案法团结案陈词).pdf | 2025 | 香港 | 特别重大 | ||
| FD06217 | 2025_港澳台_香港大埔宏福苑-特别重大火灾事故调查报告(委员会代表开场陈词).pdf | 2025 | 香港 | 特别重大 | ||
| FD06218 | 2025_港澳台_香港大埔宏福苑-特别重大火灾事故调查报告(委员会代表结案陈词627页).pdf | 2025 | 香港 | 特别重大 | ||
| FD06219 | 2025_港澳台_香港大埔宏福苑-特别重大火灾事故调查报告(居民代表结案陈词).pdf | 2025 | 香港 | 特别重大 | 焊接/动火 | |
| FD06220 | 2025_港澳台_香港大埔宏福苑-特别重大火灾事故调查报告(居民改进措施建议).pdf | 2025 | 香港 | 特别重大 | 焊接/动火 | |
| FD06221 | 2025_港澳台_香港大埔宏福苑-特别重大火灾事故调查报告(市建局结案陈词).pdf | 2025 | 香港 | 特别重大 |
FD06029 | 2024_美国_NIOSH_face202402.pdf
分类:06_境外及港澳台调查报告 | 年份:2024 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
Page i
Career Engine Company Officer Dies in Abandoned, Single-Family Structure Fire – North Carolina Executive Summary On March 29, 2024, a 53-year-old career firefighter with the rank of captain (E3 captain) died from injuries sustained in an abandoned, single-family, structure fire after becoming lost within the structure on March 26, 2024. E3 captain was the company officer of the first due engine company making an interior fire attack. The single-family residential structure was an approximately 1,400 square feet, one story, wood frame construction. The structure was deemed abandoned by the local housing office and was boarded up prior to the incident. At approximately 0000 hours, the local communications center received a 9- 1-1 call reporting a fire in the structure from a bystander. At 0002 hours, the local communications center dispatched a box alarm assignment to the address for a reported structure fire. Engine 3 (E3), Battalion Chief 7 (BC7), Ladder 1 (L1), Engine 1 (E1), and Quint 2 (Q2) were dispatched. At 0005 hours, the communications center advised the responding fire companies that the local police department was on-scene advising the “backside of house is fully engulfed” and that it was “believed everyone is out of the house.” E3 arrived on-scene at 0006 hours and reported a working fire. The E3 firefighter stretched a 200’ 1¾ - inch attack line to the front door on side Alpha to prepare for an interior fire attack. L1 arrived on-scene at 0007 hours and split their crew of four. The L1 captain and a firefighter reported to side Alpha to meet with the crew from E3 and forced open the front door. E3 captain and firefighter along with the L1 captain and firefighter made entry into the structure and observed moderate, lazy, and brown smoke with no significant heat. No immediate fire conditions were encountered as the crew from L1 proceeded to conduct a left-hand search while the E3 crew advanced into the structure. BC7 arrived on-scene and assumed incident command (IC). IC repositioned for a better view of the active fire on side Delta at the side Charlie corner. REPORT F2024-02 • March 2025 Side Alpha post fire event (Courtesy of Fire Marshal Office)
Page ii Career Engine Company Officer dies in Abandoned, Single-Family Structure Fire – North Carolina Report # F2024-02 IC requested a water supply be established to E3 from E1 upon their arrival from a nearby hydrant, requested electrical utility services from the communications center, and requested on-scene fire companies switch to the tactical radio channel. The IC assigned Q2 as the rapid intervention crew (RIC) upon arrival and established an offensive strategy which was announced via the radio system on the tactical radio channel. At approximately 0009 hours, E1 was establishing a water supply and informed the IC that a 1¾- inch backup attack line had been stretched to side Alpha at the side Delta corner. The nozzle firefighter from E3 continued to advance into the structure approximately eight to ten feet before conditions began to change with zero visibility. L1 continued a left-hand search entering a bedroom while E3 captain reported he was going back to the entry door to “get more hose.” Both the L1 interior crew and E3 firefighter began to observe changing fire conditions in the interior with decreased visibility and increased temperatures. The firefighter from E3 began to flow water from the 1 ¾ - inch attack line towards side Charlie (rear) of the structure from the inside with no observed changes in fire conditions. At 0012 hours, the company officer from E1 informed IC that heavy fire was venting out the side Alpha door. IC acknowledged the radio message and observed a second room on side Delta flashover through the exterior windows of the structure. IC announced a change in strategy to a defensive mode and requested a personnel accountability report (PAR). IC was informed that L1 and E3 still had firefighters inside the structure when IC specifically requested that they withdraw from the structure. At 0014:57 hours, the apparatus operator from Q2 informed IC that crews were outside the structure but that E3 captain was unaccounted for. RIC informed the IC that E3 captain was not located on the exterior of the structure and RIC was deployed to the interior at 0017:24 hours. Approximately two minutes after the RIC deployment to the interior, the RIC could hear an audible personal alert safety system (PASS) device towards the rear of the structure (side Charlie). RIC located the E3 captain in the rear of the kitchen on side Charlie at the Bravo corner at approximately 0021 hours. E3 captain was removed by being drug to the front door on side Alpha. E3 captain was awake and alert upon removal from the structure with personal protective equipment (PPE) and self-contained breathing apparatus (SCBA) still intact. He was airlifted from the scene to a local burn center where he succumbed to his injuries three days later. Contributing Factors • Vacant and abandoned building marking system • Crew integrity • Two-way portable radio communications • Thermal Imaging (TI) device usage • Fire dynamics in relation to flow path • Strategy and tactics for transitional fire attack • Safety and survival training for self-rescue.
Page iii Career Engine Company Officer dies in Abandoned, Single-Family Structure Fire – North Carolina Report # F2024-02 Key Recommendations Fire departments should: • Consider working with local officials to develop a vacant/abandoned building management and marking system. • Ensure that crew integrity is properly maintained by visual, direct, or verbal (voice or radio) contact when operating in an immediately dangerous to life and health (IDLH) atmosphere. • Develop policies and ensure that all personnel are trained on the features and use of portable radio operations, particularly as they relate to building muscle memory in daily response habits. • Ensure personnel understand the capabilities, use, and limitations of thermal imaging (TI) devices and utilize them during interior structural firefighting operations. • Develop or revise policies, strategies, and tactics to include modern research of fire dynamics and the movement of air and fire within a structure. • Develop policies, strategies, and tactics related to the exterior extinguishment or resetting of the seat of fire, slowing both vertical and/or horizontal fire spread prior to interior firefighting operations. • Develop training initiatives that focus on the knowledge, skill, and ability of firefighter safety/survival self-rescue training to include emergency egress and low-profile clearance.
The National Institute for Occupational Safety and Health (NIOSH) initiated the Fire Fighter Fatality Investigation and Prevention Program to examine deaths of firefighters in the line of duty so that fire departments, firefighters, fire service organizations, safety experts and researchers could learn from these incidents. The primary goal of these investigations is for NIOSH to make recommendations to prevent similar occurrences. These NIOSH investigations are intended to reduce or prevent future firefighter deaths and are completely separate from the rulemaking, enforcement and inspection activities of any other federal or state agency. Under its program, NIOSH investigators interview persons with knowledge of the incident and review available records to develop a description of the conditions and circumstances leading to the deaths in order to provide a context for the agency’s recommendations. The NIOSH summary of these conditions and circumstances in its reports is not intended as a legal statement of facts. This summary, as well as the conclusions and recommendations made by NIOSH, should not be used for the purpose of litigation or the adjudication of any claim. For further information, visit the program website at www.cdc.gov/niosh/firefighters/fffipp/ or call toll free 1-800-CDC-INFO (1-800-232-4636).
Career Engine Company Officer Dies in Abandoned, Single- Family Structure Fire – North Carolina
Page 1 REPORT F2024-02 • March 2025 Introduction On March 26, 2024, a 53-year-old career firefighter, holding the rank of captain, with 19 years in the department died while engaged in an interior fire attack at a single-family, one-story, wood frame structure fire. On April 1, 2024, the U.S. Fire Administration (USFA) notified the National Institute for Occupational Safety and Health (NIOSH) of this incident. On April 28 through May 2, 2024, two investigators representing the NIOSH Fire Fighter Fatality Investigation and Prevention Program (FFFIPP) traveled to North Carolina to investigate this incident. The NIOSH investigators met with the fire chief and staff, training division, inspections and investigations bureau, local city officials, and the 9-1-1 communications center. NIOSH also conducted interviews with fire officers and firefighters that responded to the box alarm incident. The NIOSH investigators inspected and photographed the deceased’s PPE and the SCBA. NIOSH investigators also reviewed the training records of specific personnel involved in the incident and reviewed the department’s standard operating procedures (SOPs) and professional development model. Fire Department The deceased firefighter (E3 captain) was part of a career fire department that has four stations with 50 uniformed personnel. This fire department serves a population of approximately 19,500 within a 20 square mile area and is led by a fire chief who is assisted by a deputy fire chief. The department has three battalion chiefs who oversee each of the three shifts. Each battalion chief also performs ancillary duties at the discretion of the fire chief such as training and safety. The fire chief and deputy chief respond off duty to incidents within the city that require additional support services. The four fire stations are geographically spread across the city limits and are staffed 24-hours a day. The fire department staffs two engine companies, one mid-mount ladder company, and a 75ft quint company used internally as a truck company. The two engine companies and quint are staffed daily with a minimum of three personnel while the minimum staffing for the ladder company is four personnel. The fire department participates in both automatic and mutual aid responses with neighboring departments throughout the county. Since this incident, the fire department has increased minimum staffing to four personnel on each apparatus daily after being awarded a Staffing for Adequate Fire and Emergency Response (SAFER) grant. The fire department does not provide transporting emergency medical services (EMS) but does respond to cardiopulmonary resuscitation (CPR) and lift assist incidents.
Page 2 Career Engine Company Officer dies in Abandoned, Single-Family Structure Fire – North Carolina Report # F2024-02 Training, Education, and Professional Development The E3 captain had extensive experience volunteering with other local fire departments around the area. He served as a fire instructor at the local community college and was actively involved in training and education within the region. The E3 captain had received International Fire Services Accreditation Congress (IFSAC) certifications in various courses to include Firefighter I and II, Instructor I and II, Inspector I, Fire Officer I and II, Driver Operator pump and aerial, and other courses. The minimum hiring qualifications for a position within the fire department include national certification in Firefighter I and II as well as Hazardous Material Operations Level. Qualifications for firefighters are largely left to the authority having jurisdiction (AHJ) with certifiable courses available through the Office of the State Fire Marshal. The fire department utilizes third-party software for continuing education and professional development, conducts weekly training, and offers training quarterly, specifically with mutual-aid partners and company officer development. The fire department is recognized by the state as a certified rescue department and conducts an annual hazardous materials drill. The department has a professional development plan to encourage the professional growth, training, and education of personnel looking to advance through the department rank structure. Apparatus, Staffing, and Communications Emergency calls are received into a local communications center which dispatches all emergency services for the county. The fire department utilizes an 800-megahertz (MHz) radio system for communications and response which is a part of a statewide public safety telecommunications system. The communications center is staffed with six dispatchers who are trained to a national standard and receive approximately 275,000 calls for service per year. No mobile data terminals (MDT’s) are utilized within the department for joint information sharing between units in the field and the communications center. Since this incident though, new technology has been acquired to provide a live stream from a 9-1-1 caller to dispatchers and responding personnel. A third-party notification system is used within the department to assist with dispatch location, hydrant locations, and information. Training is being adopted to incorporate the communication center dispatchers into fire-based scenarios and training. At the time of incident, each individual firefighter in the department was assigned a personal portable radio to be utilized while on-duty. Tables 1 and 2 below outline the responding apparatus to the box alarm including off duty chief staff to provide incident support.
Table 1 Box alarm assignment
Resource Designation Staffing level Engine 3 3 Ladder 1 4
Page 3 Career Engine Company Officer dies in Abandoned, Single-Family Structure Fire – North Carolina Report # F2024-02 Quint 2 4 Engine 1 3 Battalion Chief 7 1
Table 2 Off duty responding chief staff Resource Designation Staffing level Chief 6 (Deputy Chief) 1 Chief 1 (Fire Chief) 1
Personal Protective Equipment Upon arrival at the scene and during the incident, E3 captain was wearing his department issued structural firefighting turnout gear including coat, pants, gloves, Nomex hood, helmet, and boots that met the current requirement of NFPA 1971, Standard on Protective Ensembles for Structural Fire Fighting and Proximity Fire Fighting (NFPA 1971, 2018). The SCBA with an integrated personal alert safety system (PASS) device was approved by NIOSH, certified as meeting the 2013 edition of NFPA 1981, Standard on Open-Circuit Self-Contained Breathing Apparatus (SCBA) for Emergency Services, by a third-party laboratory (NFPA 1981, 2013). E3 captain was also wearing a fire department t-shirt and carrying a portable radio with a corded remote speaker microphone (RSM). The NIOSH investigators examined and photographed the PPE at the local Office of the Fire Marshal. Upon visual inspection of the PPE, extensive thermal degradation was noted to the turnout pants and coat, both on the outer shell and moisture barriers. This damage was more specifically to the left side, indicating that the E3 captain was laying prone with his right-side shielded during flashover. The Nomex hood, helmet, SCBA, and boots also suffered extensive thermal degradation to the left side. The SCBA facepiece had severe staining and discoloration with no visibility through the facepiece lens. However, it was intact and operational. The SCBA regulator and supply hose had deformities due to melting. However, both were still intact. Although, the PPE suffered extensive thermal degradation, exposure to extreme temperatures exceeding the PPE’s capabilities is not considered to be a contributing factor in this incident. Weather and Road Conditions The weather on March 25, 2024, at approximately 2354 hours, was reported as cloudy. This was approximately 8 minutes before the box alarm dispatch. The temperature was 48°F with winds east at 5 mph. The humidity was 50% with no precipitation noted. Weather conditions at the time of incident are not considered to be a contributing factor in the incident (Weather Underground, 2024).
Page 4 Career Engine Company Officer dies in Abandoned, Single-Family Structure Fire – North Carolina Report # F2024-02 Structure This single-family, non-sprinkled, residential structure was situated on a 0.61-acre lot located in an urban environment. Fire hydrant access to the property was available and utilized during the incident. The local government zoning office listed the structure as a 1,436 square foot, single-story residential home. The structure had electricity service from the local electrical grid system through the weather head of the structure. However, the local power company had blanked the electrical meter which prevented any electricity from entering the structure.
Photo: 1 Aerial view of structure with sides of the structure labeled A (Alpha), B (Bravo), C (Charlie), and D (Delta) (Courtesy of Google Earth) This structure had four-bedrooms and two-bathrooms. It was built in 1930 and was wood frame construction with a vinyl siding exterior. It contained 2x4 interior stud walls that were covered with both common drywall as well as lath and plaster interior finishings. The sloping roof structure was constructed of wood roof rafters covered in a metal roof exterior finishing. For this report, side Bravo is orientated to the north followed by side Charlie to the east, side Delta to the south, and side Alpha to the west (see Photo 1). NIOSH investigators were able to gain access to the structure to take photographs and measurements.
Page 5 Career Engine Company Officer dies in Abandoned, Single-Family Structure Fire – North Carolina Report # F2024-02
Diagram 1: Structure diagram (Courtesy of NIOSH)
Page 6 Career Engine Company Officer dies in Abandoned, Single-Family Structure Fire – North Carolina Report # F2024-02
Diagram 2: First floor diagram and approximate location E3 captain was found. Note: Diagram not to scale. (Courtesy of NIOSH)
Page 7 Career Engine Company Officer dies in Abandoned, Single-Family Structure Fire – North Carolina Report # F2024-02 Timeline The following timeline is a summary of events that occurred as the incident evolved. Not all incident events are included in this timeline. The times are approximate and were obtained by examining the dispatch records, audio recordings, witness statements, and other available information. The timeline is not intended, nor should it be used, as a formal record of events. Time (hours) Fireground Response, Operations, and Details 0000 • 9-1-1 call received by communications center indicating a house on fire • Local police discover the house fire and request the fire department for a “fully engulfed” house 0002 • E3, E1, L1, Q2, and B7 dispatched to structure fire 0004 • All fire companies enroute 0005 • Communications center advises responding fire companies that police are on-scene. Police advised backside of structure is “fully engulfed,” everyone believed to be out, and several calls received 0006 • E3 arrived on-scene, pulling past the address on side Alpha and advised “working fire” • Visible fire observed on side Delta at the side Charlie corner 0007 • L1 arrived on-scene on side Alpha in front of the structure • L1 split the crew of four into two teams (interior and exterior) • BC7 arrived on-scene, assumed IC, announced an offensive strategy, and requested all companies switch to the tactical radio channel • BC7 repositioned vehicle to have a view of side Delta but doesn’t have a clear line of sight to side Alpha. Incident command post (ICP) established inside the BC7 vehicle • IC informed E1 that they need a supply line to E3
0008 • E1 arrived on-scene and stretched approximately 200’ of 5-inch supply line from E3 to the hydrant just down and across the street from the scene • IC assigned Q2 as the RIC upon arrival 0009 • E1 to IC – Backup line stretched and charged to side Alpha • E3 and L1 made entry into the structure from the front door on side Alpha
Page 8 Career Engine Company Officer dies in Abandoned, Single-Family Structure Fire – North Carolina Report # F2024-02 Time (hours) Fireground Response, Operations, and Details 0010 • Outside vent firefighter informed IC that live wires were down at the side Bravo/Charlie corner • Q2 arrived on-scene • IC requested electric company response from communications center 0011 • Q2 informed IC that RIC was established • RIC was established at the side Alpha/Bravo corner • E1 company officer requested a 360 degree walk around from the Q2 company officer 0012 • E1 company officer informed IC that heavy fire was venting out the side Alpha door • IC acknowledged and agreed to a defensive strategy • E3 apparatus operator informed IC that a water supply was established 0012:31 • IC announced via the radio a change to a defensive strategy • IC observed a second bedroom on side Delta flashover through the windows 0013:01 • IC inquired via the radio if all on-scene companies were out of the structure • IC’s visibility is limited to side Delta with a partial view of side Alpha 0013:10 • IC was informed that L1 and E3 are still interior 0013:20 • IC ordered L1 and E3 via the radio to exit the structure • Fire and smoke conditions began to rapidly change, coming out of the door on side Alpha 0013:40 • E3 apparatus operator confirmed with IC that he ordered an evacuation • E3 apparatus operator began to sound the air horn on the apparatus to signal evacuation • E1 apparatus operator deployed a 200’ 2 ½ - inch line on side Delta and requested it be charged 0014:50 • IC asked if all companies were out of the structure
Page 9 Career Engine Company Officer dies in Abandoned, Single-Family Structure Fire – North Carolina Report # F2024-02 Time (hours) Fireground Response, Operations, and Details
• Visible fire was venting out the front door on side Alpha 0014:57 • Q2 apparatus operator advised command that E3’s company officer was still inside • Visible fire venting from the front door on side Alpha was being attacked by a 1 ¾-inch attack line • The interior 1 ¾ -inch attack line was removed from the structure with the nozzle firefighter during the evacuation 0015:30 • L1 company officer called for E3 captain on the radio with no response 0015:39 • L1 company officer asked over the radio if anyone had eyes on the E3 captain 0016:07 • IC ordered the 1 ¾-inch back-up attack line to the front porch on side Alpha • IC left the ICP to gain a better view of side Alpha 0017:08 • RIC advised IC that the E3 captain still had not been located on the exterior of the structure • RIC worked along the exterior of side Bravo, utilizing a TI device and looking into windows trying to locate E3 captain 0017:24 • IC deployed the RIC to the interior from side Alpha • RIC deployed and made entry on side Alpha with a 1 ¾-inch attack line • E1 company officer joined the RIC crew upon entry 0018:03 • IC notified the communications center of a Mayday on the main radio channel • Communications center rebroadcasted the Mayday declaration on the main radio channel 0018:59 • IC requested the next three closest departments respond to the scene 0019:16 • Chief 6 on-scene
Page 10 Career Engine Company Officer dies in Abandoned, Single-Family Structure Fire – North Carolina Report # F2024-02
Time (hours) Fireground Response, Operations, and Details 0019:36 • E1 company officer advised IC they could hear a PASS device in the rear of the structure • RIC encountered several rooms of fire and were searching as they continued firefighting towards side Charlie 0020:51 • RIC confirmed with the IC that they were still working towards side Charlie and could still hear a PASS device • RIC continued to encounter fire throughout the structure while utilizing their 1 ¾-inch attack line 0021:31 • RIC to IC – “I got him, I got him, I got him” • RIC confirmed the E3 captain was breathing and SCBA was functioning. RIC silenced the PASS device on E3 captain’s SCBA 0022:19 • RIC announced they had E3 captain on side Bravo at the windows and needed a ladder • RIC was working in zero visibility and attempted to utilize the Rapid Intervention Universal Air Connection (RIC-UAC) J’P-8from the RIC kit 0023:44 • RIC informed the IC to have EMS ready at the door of side Alpha • RIC changed extrication plans when they heard the low air alarm activate on E3 captain’s SCBA 0024:28 • L1 company officer confirmed with IC that all companies were outside the structure • E3 captain was awake and talking after the doffing of his SCBA 0024:38 • IC informed the communications center that the missing firefighter had been removed from the structure 0046:08 • E3 captain transported from the scene to the landing zone 0058:53 • Medical helicopter departed the landing zone to transport the E3 captain to a local trauma center
Page 11 Career Engine Company Officer dies in Abandoned, Single-Family Structure Fire – North Carolina Report # F2024-02 Investigation On March 26, 2024, at 0000 hours, the local communications center received a 9-1-1 call reporting a house on fire. The 9-1-1 caller told the communications dispatcher upon questioning that “nobody is inside” and that the “back of the house” was on fire. Simultaneously, a patrol officer from the local police department radioed the communications center to start the fire department for a “fully engulfed” structure fire but was later corrected to the fire being in the rear (side Charlie) of the structure. The communications center dispatcher instructed the 9-1-1 caller to follow standard prearrival instructions to include not entering the structure and to safely keep bystanders free of the area. The communications center entered the information into the computer aided dispatch (CAD) system and initiated the box alarm assignment for the location. Box alarm fire companies were dispatched at 0002 hours consisting of E3, E1, L1, Q2, and BC7. Assigned fire companies were enroute by 0004 hours (see Table 3). At 0005 hours, the communications center advised the responding fire companies that the local police department was on- scene, and advising the rear of the structure was “fully engulfed” and with everyone believed to be out of the structure. During the fire department response, the local police department worked to gather information from bystanders on the scene and began to control traffic within the area while leaving access for arriving units. Table 3 On-scene resource assignments Apparatus Assignment BC7 Incident Command E3 Interior Fire Attack – 200’ 1 ¾-inch attack line L1 Interior search and rescue / outside vent crew E1 Backup attack line side Alpha – 200’ 1 ¾-inch attack line Q2 RIC – side alpha/bravo corner
E3 (apparatus of the deceased) arrived first on-scene at 0006 hours. E3 pulled past the location to leave access for the ladder company and provided an on-scene report of “working fire.” No further information or size-up information was provided by the E3 captain to incoming fire companies. The firefighter from E3 stretched a 200’ 1 ¾ -inch attack line to the front door on side Alpha as L1 arrived at 0007 hours. L1 split their four-person crew into two working groups for both interior and exterior operations. The company officer and a firefighter from L1 reported to the front door on side Alpha and utilized traditional forcible entry techniques to force open and control the door while the apparatus operator and firefighter (outside crew) from L1 checked utilities, assisted with the large diameter
Page 12 Career Engine Company Officer dies in Abandoned, Single-Family Structure Fire – North Carolina Report # F2024-02 supply line, and prepared L1 for aerial operations. Before making an interior offensive fire attack through side Alpha, E3 captain returned to E3 to retrieve the TI device from the apparatus. At 0007 hours, BC7 arrived on-scene, assumed IC, announced an offensive strategy via the radio, and requested all on-scene personnel switch to the tactical channel per department policy. BC7 had to reposition his department vehicle to better observe the fire conditions on side Delta but had limited visibility to side Alpha. The ICP was established inside BC7’s vehicle. At 0008 hours, IC requested that E1 establish a water supply from a nearby hydrant. E1 stretched approximately 200’of 5-inch supply line from E3 to secure the water source. IC assigned Q2 as the RIC and set up at the side Alpha/Delta corner. The E3 crew (company officer and firefighter) and L1 crew (company officer and firefighter) made entry into the structure from side Alpha at approximately 0009 hours and observed brown smoke with limited visibility throughout the structure. No visible fire was observed upon entry as L1 proceeded to conduct a left-hand search while E3 pushed forward into the structure. E1 advised the IC that a backup 1 ¾ -inch attack line had been stretched and charged to side Alpha. L1 exterior crew advised IC that live wires were down at the service drop to the structure at the side Bravo/Charlie corner. IC acknowledged this message and requested utility services to the scene.
Diagram 3: Apparatus, attack, supply line placement. Note: Diagram not to scale. (Courtesy of NIOSH)
Page 13 Career Engine Company Officer dies in Abandoned, Single-Family Structure Fire – North Carolina Report # F2024-02 At approximately 0011 hours, the company officer from E1 requested the RIC (i.e., Q2) conduct a 360- degree walkaround of the structure which was acknowledged. E3’s captain and firefighter continued to advance into the structure a few feet, with both periodically stopping to check for accountability. The E3 firefighter began to experience changes in both smoke and temperatures with visible fire being seen inside the structure. He began to flow water towards the rear of the structure when he heard E3 captain yell that he was going to get more hose. At 0012 hours, the company officer from E1 advised IC that heavy fire was venting out the side Alpha door. IC acknowledged the message and observed a middle room in the structure on side Delta flashover through the windows. The IC announced a change in strategy on the radio to a defensive operation. This message was acknowledged by the apparatus operator of E3 who began to sound the airhorns to indicate to interior crews that they needed to withdraw from the structure. A 200’ 2 ½”-inch smoothbore attack line was then stretched to side Delta. At 0013:01, IC inquired if all companies had exited the structure when he was informed that L1 and E3 interior crews were still inside the structure. IC called both L1 and E3 captains on the radio and instructed them to evacuate the house. However, this message was never acknowledged by E3 captain. As noted in interviews conducted by NIOSH, the fire conditions at this point began to rapidly deteriorate both on the interior and exterior. At 0014:50 hours, the IC asked again if all companies had been able to evacuate the structure. The apparatus operator of Q2 advised IC that E3 captain was still inside the structure. L1 company officer and firefighter, along with the nozzle firefighter from E3, exited the structure on side Alpha. Personnel from E1 were using the 1 ¾- inch backup attack line to knock back the fire that was coming out the side Alpha door. The initial 1 ¾ - inch attack line was removed out of the structure by the nozzle firefighter upon his exit. The company officer from L1 called for E3 captain directly on the radio at 0015:30 hours with no answer. L1 company officer then asked all on-scene companies if anyone had E3 captain in their sight. At 0016:07 hours, the IC ordered that the backup line be placed into service at side Alpha and the IC left the ICP to gain a better view of the operations on side Alpha. RIC advised IC that they had scanned the windows alongside Bravo and the exterior of the structure but were unable to account for the E3 captain. IC deployed the RIC including the company officer from E1 to the interior of the structure. RIC deployed with the 1 ¾-inch attack line that was obtained from the E3 firefighter who had exited the structure. IC notified the communications center on the main fire channel of a Mayday deployment at 0018:03 hours and requested the next closest three fire companies to respond to the scene. E1 company officer (now attached to the RIC) advised at 0019:36 hours that a PASS device could be heard towards the rear (side Charlie) of the structure from the interior. RIC encountered several rooms of active fire as they continued to advance down the center hallway towards side Charlie. RIC provided a status report at 0020 hours to the IC that they were still working their way to side Charlie. At 0021:31 hours RIC transmitted to IC, “I got him, I got him, I got him.” RIC was able to confirm the E3 captain was breathing and awake with his SCBA appearing to be functioning properly. RIC silenced the PASS device on the SCBA and advised they were near some windows on side Bravo. They requested a ladder to the window. RIC was working in zero visibility and attempted to use the
Page 14 Career Engine Company Officer dies in Abandoned, Single-Family Structure Fire – North Carolina Report # F2024-02 RIC/UAC in conjunction with the RIC kit. At approximately 0023 hours, RIC drug the E3 captain out of the structure through the hallway and requested that EMS be ready on side Alpha. L1 informed IC that all personnel including E3 captain were out of the structure on side Alpha at approximately 0024 hours. IC informed the communications center at 0024:38 hours that the missing firefighter had been located and removed from the structure. E3 captain was awake and talking upon being removed from the structure. He was treated by on-scene EMS personnel before being transported to a nearby landing zone at 0046:08 hours. He was air lifted to a trauma center at approximately 0058 hours. Unfortunately, E3 captain later succumbed to the injuries sustained during the incident three days later. Fire Origin and Cause At the time of this report being published, the Bureau of Alcohol, Tobacco, Firearms and Explosives (ATF) field office and investigating partners noted that the origin, cause, and classification were still under investigation. Cause of Death The Office of the Medical Examiner listed the cause of death as complications from thermal cutaneous injuries, partial and full thickness burns, anasarca, and cerebral edema. Contributing Factors Occupational injuries and fatalities are often the result of one or more contributing factors or key events in a larger sequence of events that ultimately result in the injury or fatality. NIOSH investigators identified the following items as key contributing factors in this incident that ultimately led to the fatality: • Vacant and abandoned building marking system • Crew integrity • Two-way portable radio communications • TI device usage • Fire dynamics in relation to flow path • Strategy and tactics for transitional fire attack • Safety and survival training for self-rescue. Recommendations Fire departments should: Recommendation #1: Consider working with local officials to develop a vacant/abandoned building management and marking system. Discussion: The local housing authority knew this structure was an abandoned property. The property was boarded up on the exterior to prevent unauthorized access. However, some of the windows had
Page 15 Career Engine Company Officer dies in Abandoned, Single-Family Structure Fire – North Carolina Report # F2024-02 been broken over the years. The structure had experienced a fire event years before this incident but was structurally intact with intact dry wall and lath and plaster interior finishings. The home was not legally occupied at the time of incident. It contained minimal debris and living furnishings, and it was not serviced by the local electrical utility service. The city government and fire department did not have a collaborative approach to managing and marking abandoned structures. The AHJ is responsible for training and certifying inspection and code enforcement personnel to ensure that the appropriate fire and building safety codes are utilized and enforced. Based upon jurisdiction, fire and life safety inspection programs may be in the fire, building, or code enforcement departments. In some fire departments, this responsibility is performed by firefighters, fire prevention divisions, or fire officers. When the authority to perform fire inspections and code enforcement is not assigned to the fire department, the fire department should develop a working relationship with the department that has this authority [IFSTA, 2016]. NFPA 1201, Standard for Providing Fire and Emergency Services to the Public, Section 6.3 states, “the fire and emergency service organization (FESO) shall seek to establish a good working relationship with the agency or authority responsible for enforcing the building code so that the review of the design, construction, alteration, or demolition of buildings and structures can be monitored to identify fire protection concerns.” This includes ensuring the investigation of fires and other emergencies to assist with developing an effective hazard and risk prevention program [NFPA 1201, 2020]. This also includes inspections, permits, code violations, fire protection maintenance and service, and any other vital information. When fire departments and fire leadership maintain a familiarity with their AHJ’s local ordinances, this enhances their ability to have input in renovations and use group changes for occupancy types within their jurisdiction. NFPA 1030, Standard for Professional Qualifications for Fire Prevention Program Positions, Chapter 7 provides the job requirements for the position of Fire Inspector. It states that the duties of this position involve conducting fire and life safety inspections, to include enforcement actions, and analyses of new and existing structures and properties for construction, occupancy, fire protection, and exposures. This includes identifying occupancy classifications, evaluating fire protection systems and equipment, and recognizing hazards and deficiencies according to applicable policies, codes, and standards adopted and maintained by the AHJ [NFPA 1030, 2024]. A hazardous building management program may reduce the risks posed by these buildings and ideally composed of three phases to include determination, remediation, and marking. Phase 1 – Determination: Determination consists of identification, evaluation, designation, and communication. • Identification: Personnel physically locate and evaluate the potential hazardous buildings. A common challenge encountered is the ability to legally access the property, especially in the case of private and residential properties where the fire department would not normally have the legal authority to access the property outside of an emergency incident. It is critical that anyone attempting to access a property fully understands their legal standing to avoid possible
Page 16 Career Engine Company Officer dies in Abandoned, Single-Family Structure Fire – North Carolina Report # F2024-02 criminal charges and hostile confrontations with property owners. Fire department personnel should work with the local AHJ to legally gain access to the properties as warranted. • Evaluation: Personnel responsible for a building management program must have the subject matter expertise to evaluate the condition of the buildings. Beyond determining if a building is vacant or abandoned, they need to have the necessary expertise to determine if it has structural integrity defects or conditions that could warrant a status of being formally condemned. Fire department personnel must exercise caution and take all necessary preventative measures to ensure their safety during the evaluation process. Hazardous buildings can present several hazards outside of the structure itself, to include the presence of unauthorized people, concealed traps, and hazardous materials. If there are questions as to the structural integrity of a building, the fire department should utilize outside subject matter expertise as needed to ensure that they can safely enter and evaluate the building. • Designation: Personnel determine the status of the building upon completion of the evaluation. The fire department can determine the status of the building for the purposes of their risk/benefit analysis during an incident. However, the fire department may not have the legal authority to formally condemn a building unless it poses an imminent risk to public safety. This is another part of the process where it is critical to work with the local AHJ if there is a need to have a building formally condemned so that it can be demolished and removed through the appropriate means. • Communication: After the status of the building has been determined, it should be effectively communicated to all parties involved (property owner, building dept, fire marshal, fire department, dispatch center, etc.).
Phase 2 – Remediation: Remediation includes demolition, marking, and securing.
• Demolition: For a derelict or condemned building, the best approach through risk management principles is to remove the hazard by having the building demolished. If a building remains, it may still be inhabited by unauthorized occupants, and it may still catch fire, forcing a fire department response. Most fire departments lack the necessary legal standing or resources needed to carry out the demolition of a building, so it is critical for them to form strategic partnerships with local agencies who can assist. • Marking: Proper marking benefits the responding fire department in recognizing the building status. There are several references that can be used for guidance when it comes to developing and implementing a building marking system.
As an example, the International Association of Arson Investigators and United States Fire Administration Abandoned Building Project utilizes a simple system consisting of a box with a diagonal line to indicate the condition of the building. The abandoned building project toolbox can be found at http://www.interfire.org/features/AbandonedBuildingProjectToolBox.asp.
Page 17 Career Engine Company Officer dies in Abandoned, Single-Family Structure Fire – North Carolina Report # F2024-02
Figure 1. High risk building marking system (Courtesy of United States Fire Administration) The 2021 International Fire Code (IFC) Appendix J Building Information Sign (International Fire Code, 2020) and the NFPA 1 Fire Code, Annex C - Fire Fighter Safety Building Marking System (Zevotek, 2022) utilize a more elaborate and detailed marking system based on a Maltese Cross that goes beyond just indicating the status of the building.
Figure 2. Updated and detailed high risk building marking system (Courtesy of NFPA) Although marking buildings can have a benefit, there can be localized challenges to implementing this action based on unique circumstances. Some fire departments have run into challenges when trying to implement these programs due to concerns over the negative stigma attached to these markings when they are concentrated in a given area or neighborhood. Therefore, it may be useful to form strategic partnerships with local community partners to explain the lifesaving benefits of implementing a marking system.
• Securing: If unauthorized individuals can be prevented from entering the building, it may eliminate the possible ignition source of a fire and prevent the fire department from having to enter for search & rescue operations. Securing the building may include both physical barriers
Page 18 Career Engine Company Officer dies in Abandoned, Single-Family Structure Fire – North Carolina Report # F2024-02 to deny access and partnering with local law enforcement or private security agencies to identify and prevent unauthorized access. Securing a building can have pros when it comes to preventing unauthorized access; however, it can also have cons if the fire department needs to enter the building. As such, the fire department needs to be aware of how to access and remove any security features established.
Phase 3 – Emergency Response: Emergency response includes recognition and risk management.
• Recognition: Through various means available (dispatch information, CAD notes, building markings, and/or effective situational awareness), responding personnel must have the ability to proactively recognize the status of a hazardous building as soon as possible. A multilayered system with repetitive information is best if a failure occurs with one of the layers. For example, if a building marker ends up missing, but the information is relayed at dispatch from a CAD note, the responders will still be aware of the hazardous building’s status. • Risk Management: The key decision makers (1st arriving officer, IC, safety officer) need to incorporate the status of the hazardous building into their risk/benefit analysis and IAP. This includes recognizing both the “status” of potential occupants and the building (NIOSH, 2024).
Recommendation #2: Ensure that crew integrity is properly maintained by visual, direct, and/or verbal (voice or radio) contact when operating in an IDLH atmosphere. Discussion: In this incident, E3 captain chose an offensive strategy that was reinforced and transmitted via the radio by BC7 upon arrival and establishing IC. The crew (captain and firefighter) from E3 proceeded to stretch an interior attack line and made entry with L1 (captain and firefighter) through the front door on side Alpha. During the initial stretch of the 1 ¾-inch attack line, the E3 captain told the nozzle firefighter that he was returning to the front door “to get more hose.” As fire conditions changed, the nozzle firefighter of E3 was unable to establish voice communications with E3 captain. During the investigation, NIOSH was unable to find any witnesses who observed E3 captain making it back to the front door.
Additionally, upon the arrival of BC7 and repositioning the BC7 vehicle for a better view of side Delta, the IC was unaware that either E3 or L1 made entry into the structure. There were no radio communications from either L1 or E3 about making entry into the structure. At 0012 hours when E1 informed the IC of changing fire conditions venting outside side Alpha through the door, the IC was unaware that E3 and L1 crews were interior. The IC specifically ordered both L1 and E3 company officers via the radio to exit the structure. The withdrawal order was never acknowledged via the radio by E3 captain. It was later determined through investigation that the portable radio being carried by E3 captain was never turned on during this incident nor did it ever register in the portable radio log from the communications system (see recommendation #3). Crew integrity is essential to fireground accountability. Fire departments should have personnel accountability policies and procedures in place to track crews and individuals. A department’s accountability system should have the capabilities to track and identify who is operating in the hazard zone, their assignment, and location. The collection of personal accountability tags or passports placed
Page 19 Career Engine Company Officer dies in Abandoned, Single-Family Structure Fire – North Carolina Report # F2024-02 on an apparatus does not assist in maintaining awareness to the fireground location of crews or individuals. NFPA 1550 Standard for Emergency Responder Health and Safety, Section 17.7 provides guidance on accountability for all resources, including personnel (NFPA 1550, 2024): • Specific means (Passport tags, software, etc.) to identify and track responders entering hazardous areas • Accounting for personnel who arrive on-scene by other means besides apparatus • Providing a process to rapidly account for all responders on-scene. Recommendation #3: Develop policies and ensure that all personnel are trained on the features and use of portable radio operations particularly, as they relate to building muscle memory in daily response habits. Discussion: In this incident, the portable radio issued to E3 captain was never turned on nor did it ever register on the radio log during the incident, preventing him from hearing any of the fire scene audio about rapidly changing fire conditions, change in strategy from offensive to defensive, and the request from the IC to evacuate the structure. There were no radio transmissions made from E3 captain after giving an initial on-scene radio report made from the mobile radio inside the cab of E3. Two-way portable radio communications are a critical component of the firefighter’s complete PPE. Personnel should build muscle memory and consistency in incorporating their portable two-way radio device into the appropriate donning of assigned PPE and turning on the portable radio once on-scene in accordance with department policy. In a position paper written by the International Association of Fire Chiefs (IAFC), they state, “Information from outside can prevent crews from advancing into dangerous conditions inside” (IAFC, 2009). Two-way portable radio communications enhance general situational awareness for first responders, confirm and communicate strategy and tactics, and most importantly, allow for firefighters to transmit distress signals and communications such as declaring a Mayday or an urgent message. If not already in place, fire department policies should outline response communications and training should be developed so that personnel understand the features and capabilities of two-way radio communications. NFPA 1802 Standard on Two-Way, Portable RF Voice Communications Devices for use by Emergency Services Personnel in the Hazard Zone provides examples of features that are incorporated into two-way portable radios that may be helpful to personnel to be aware of and trained on to include (NFPA 1802, 2021): • Power/volume knob • Selector knob • EAB (emergency alert button) • Time-out timer • Out-of-range Detection.
Page 20 Career Engine Company Officer dies in Abandoned, Single-Family Structure Fire – North Carolina Report # F2024-02 Recommendation #4: Ensure personnel understand the capabilities, use, and limitations of thermal imaging (TI) devices and utilize them during interior structural firefighting operations. Discussion: In this incident, E3 captain returned to the engine company after the initial attack line was stretched to side Alpha to retrieve the TI device assigned to E3. During the initial fire attack, it is unknown as to whether he ever used the TI device. Following the Mayday and removal of E3 captain to side Alpha, the TI device was discovered just inside the front door on side Alpha. The TI device was not found with the E3 captain, on his PPE, or in the room where he was found. The Western Fire Chiefs Association noted that TI devices are helpful in many situations while improving both speed and effectiveness (Western Fire Chiefs Association, 2024). While the fire service provides many opportunities for TI device usage such as hazardous materials, search and rescue, fire attack, etc., one of the primary components to TI use is to maintain broad situational awareness to the conditions inside zero visibility environments. The ability to detect changes in fire conditions, flow paths, and egress can all be applicable reasons to use TI during interior firefighting. Personnel should be trained to specific characteristics, features, modes, and overall capabilities of a department’s specific TI device. Fire departments should use caution when selecting TI devices that are incorporated into other PPE components like SCBA and helmets to ensure the technology meets NFPA 1801 Standard on Thermal Imagers for the Fire Service if being utilized as the primary TI device. Personnel should be mindful to incorporate the use of TI where available and build the muscle memory needed when TI devices are incorporated into the daily wearing and use of PPE ensembles. Recommendation #5: Develop or revise policies, strategies, and tactics to include modern research of fire dynamics including the movement of air and fire within a structure. Discussion: In this incident, E3 approached the scene from the north traveling south and was able to observe sides Bravo, Alpha, and Delta upon arrival. Visible and well-developed fire was observed on side Delta at the Charlie corner. E3 provided an on-scene report of “working fire.” The E3 firefighter stretched a 1 ¾ - inch attack line to side Alpha as the E3 company officer chose an interior fire attack. Conditions on side Alpha didn’t reveal anything significant to note with only light smoke around the porch area. The crew from E3 met with the L1 crew to utilize traditional forcible entry techniques to gain access to the interior on side Alpha. The front door on side Alpha remained open as both E3 and L1 made entry into the structure for an interior fire attack. E3 and L1 interior crews had been inside the structure for approximately four minutes when the E1 company officer relayed the message to the IC that fire was venting out the front door on side Alpha. Within this four-minute time frame the fire had been drawn from the side Delta/Charlie corner through the structure and out the front door. Upon investigation, the abandoned structure was largely intact with limited combustible furnishings. A flow path is “the movement of heat and smoke from the higher pressure within the fire area towards the lower pressure areas accessible via doors, window openings, and roof structures” (NFPA Glossary of Terms, 2021). Flow paths consist of an inlet and an exhaust with the direction of travel being determined by pressure. Heat and smoke in a high-pressure area will travel to an area of lower
Page 21 Career Engine Company Officer dies in Abandoned, Single-Family Structure Fire – North Carolina Report # F2024-02 pressure. It is possible to have multiple flow paths within a structure dependent upon the size of the building, openings, closures such as fire doors, and overall structure design. Personnel working in the flow path (between the seat of the fire and the exhaust) operate in a significantly risky environment. Coordinated ventilation tactics should be utilized to redirect the flow path from interior operations. The International Fire Service Training Association notes that firefighters advancing hose lines or ventilating windows create newly formed flow paths between the seat of the fire and ventilation points to the exterior (IFSTA, 2018).
Figure 3. IFSTA Essentials of Firefighting 7th Edition Figure 4.47 (Courtesy of IFSTA) When identifying the flow path within a structure, personnel should be mindful to wind conditions. Wind can create pressure changes within a structure or building which could spread smoke and fire into non impacted parts of the structure or building. Interior firefighting personnel should be mindful to these changes in conditions that place the interior firefighting personnel in the exhaust portion of the flow path. Sudden changes in temperature and smoke are factors that should alert interior personnel of imminent changes to conditions. Water should be applied to the fire as quickly as possible utilizing the reach of an effective fire stream that is delivering an appropriate volume of water that will overcome the heat release rate. In some cases, it may be appropriate to introduce water from the exterior of a structure through a window/door with an attack line or begin the fire attack from the exterior with a coordinated blitz attack flowing 300 gallons per minute or greater before committing personnel to the interior. Fire departments should cool interior spaces from the safest and closest location possible, especially in vent limited spaces.
Recommendation #6: Develop policies, strategies, and tactics related to the exterior extinguishment or resetting of the seat of fire, slowing both vertical and/or horizontal fire spread prior to interior firefighting operations.
Page 22 Career Engine Company Officer dies in Abandoned, Single-Family Structure Fire – North Carolina Report # F2024-02 Discussion: In this incident, the fire began inside the abandoned structure and was immediately discovered and reported to the 9-1-1 communications center. A local law enforcement officer on patrol also quickly discovered the structure fire and requested the fire department. Upon arrival of E3, a well- developed fire was burning on side Delta at the Charlie corner that had vented to the exterior of the structure. Both the 9-1-1 caller and local law enforcement officer provided information that the structure was believed to be empty of any occupants and this information was relayed to responding fire companies. Fires venting from the exterior with both vertical and horizontal spread can present a hazard to arriving fire department personnel. First arriving company or chief officers on-scene should be mindful to the many factors involving fire dynamics when considering the appropriate strategy for the incident. Paraphrased from NFPA 1700 Guide for Structural Firefighting, Chapter 9 (NFPA 1700, 2021), these include: • Smoke and fire conditions – Read the smoke based on volume, velocity, color, and density • Fuel load – Increased fuel loads may increase higher heat release rates • Openings – Windows, doors, and structural openings that can provide a pathway for fire extension • Flow path – Air and gases move from higher pressure to lower pressure via doors and windows within a structure • Weather Conditions – Wind should be evaluated to recognize the hazards of a wind-driven fire • Accessibility of the structure – Apparatus placement, water supply, and access for fire attack and ground ladders • Fire progression – 360-degree walkaround predictions made to fire spread while considering fire dynamics and outcomes of fire attack and ventilation • Fire Control Positioning – Location of the seat of the fire, survivability profiling, and access.
Consideration should be given to a transitional attack when the first arriving company or chief officers on-scene and observe active and well-developed fire accessible from or involving the exterior of a structure that is spreading vertically, horizontally, or both with survivable space within the structure. Company or chief officers should include the type and occupancy status of a structure and a risk/benefit analysis when making tactical decisions. A transitional attack is “the application of a fire stream from the exterior of a structure to improve conditions prior to interior fire control” (NFPA Glossary of Terms, 2021). Recommendation #7: Develop training initiatives that focus on the knowledge, skill, and ability of firefighter safety/survival self-rescue training to include emergency egress and low-profile clearance. Discussion: In this incident, E3 captain made an interior fire attack through the front door on side Alpha. After the nozzle firefighter advanced a short distance into the structure, E3 captain informed the nozzle firefighter that he “was going to get more hose.” E3 captain was never observed returning to the front door on side Alpha nor was any hose advanced into the structure. E3 captain had become lost and disoriented within the structure and was found in the rear (side Charlie at Bravo) corner by the RIC
Page 23 Career Engine Company Officer dies in Abandoned, Single-Family Structure Fire – North Carolina Report # F2024-02 after a Mayday had been declared by L1 on behalf of E3 captain. It is unknown what actions E3 captain performed to self-rescue. However, two smaller windows were present in the laundry room where he was found by RIC. It can be concluded from interviews and photographs that E3 captain assumed a prone position on the floor and experienced most of the thermal assault to his left side. Interior structural firefighting personnel should be trained to both recognize and avoid, when possible, the following hazards as listed in the International Fire Service Training Association (IFSTA) Essentials of Fire Fighting (IFSTA, 2024): • Air emergencies • Lost/disoriented • Entanglement • Rapid fire development • Collapse/trapped.
Further, the following skills should be incorporated into a firefighter’s self-rescue training program. This list is not intended to be all inclusive but serve as general guidance. • Declaring Maydays – Location, Unit, Name, Air, Resources, and PASS device activation • Reduced profile maneuvers • Window egress techniques • Emergent ladder egress/escape • Emergency bail out systems • Disentanglement from debris and wires • Wall breaches.
The International Association of Fire Fighters (IAFF) (FGS) cadre notes “Fire fighters must be trained to perform potentially life-saving actions if they become lost, disoriented, injured, low on air, or trapped” (IAFF, 2024). Funded in part by a grant from the U.S. Department of Homeland Security and the Assistance to Firefighters (FIRE Act), the IAFF offers both online and on-site training related directly to firefighter survival training and tactics. A 2023 article posted to FireRescue1 provides some realistic training examples and drills that can assist fire departments in training for declaring Maydays, orientation, props, low air emergencies, and trapped firefighter simulations. Andrew Beck, firefighter/EMT and author of this FireRescue1 article notes that readers should “Define your parameters, practice the procedures, and ensure it’s realistic. You will prepare your folks to succeed when it’s truly life or death” (Beck, 2023). References Beck, A. [2023]. Practice makes automatic: Simple mayday training to instill good habits. Retrieved September 2024, from FireRescue1. IAFC [2009]. Position Statements. Retrieved August 2024, from International Association of Fire Chiefs.
Page 24 Career Engine Company Officer dies in Abandoned, Single-Family Structure Fire – North Carolina Report # F2024-02 IAFF [2024]. Fire-Ground-Survival. Retrieved 2024, from International Association of Fire Fighters. IFSTA [2016]. Fire Inspection and Code Enforcement. 8th ed. Stillwater, OK: International Fire Service Training Association. IFSTA [2018]. Fire Dynamics. In O. S. University, Essentials of Firefighting 7th Edition (p. 162). Stillwater, OK: International Fire Service Training Association. IFSTA [2024]. Firefighter Survival During Interior Operations. In Essentials of Fire Fighting (Eighth ed., p. 456). Stillwater, OK: International Fire Service Training Association. International Fire Code [2020]. Appendix J Building Information Sign. Retrieved June 2024, from International Fire Code. NFPA [2013]. NFPA 1981, Standard on Open-Circuit Self-Contained Breathing Apparatus (SCBA) for Emergency Services. Quincy, MA: National Fire Protection Association. NFPA [2018]. NFPA 1971, Standard on Protective Ensembles for Structural Fire Fighting and Proximity Fire Fighting. Quincy, MA: National Fire Protection Association. NFPA [2020]. NFPA 1201, Standard for providing fire and emergency services to the public. Quincy, MA: National Fire Protection Association. NFPA [2021]. NFPA 1700, Guide for Structural Fire Fighting Chapter 9. Strategic Considerations. Quincy, MA: National Fire Protection Association. NFPA [2021]. NFPA 1802, Standard on Two-Way, Portable RF Voice Communications Devices for use by Emergency Services Personnel in the Hazard Zone. Quincy, MA: National Fire Protection Association. NFPA [2024]. NFPA 1030, Standard for professional qualifications for fire prevention program positions, Quincy, MA: National Fire Protection Association. NFPA [2024]. NFPA 1550, Standard for Emergency Responder Health and Safety Section 17.7. Quincy, MA: National Fire Protection Association. NFPA Glossary of Terms [2021]. Quincy, MA: National Fire Protection Association. Weather Underground [2024]. Greensboro, NC Weather History. Retrieved July 2024, from wunderground.com. Western Fire Chiefs Association [2024, July 9]. Thermal Imaging Camera (TIC) in Firefighting. Retrieved September 4, 2024, from Western Fire Chiefs Association. Zevotek, R. [2022, July 15]. Firefighter Safety Building Marking Systems. Retrieved June 2024, from National Fire Protection Association.
Page 25 Career Engine Company Officer dies in Abandoned, Single-Family Structure Fire – North Carolina Report # F2024-02 Investigator Information This incident was investigated by Patrick R. Montague (former), Investigator and Louis (Rick) Lago (former), Investigator, both with the Fire Fighter Fatality Investigation and Prevention Program, Surveillance and Field Investigations Branch, Division of Safety Research, NIOSH located in Morgantown, WV. The report was written by Patrick R. Montague (former), retired Battalion Chief, and credentialed Chief Fire Officer. An expert technical review was provided by Timothy S. Cowan, Deputy Fire Chief, Dewitt Fire District in Central New York. A technical review was also provided by the National Fire Protection Association, Emergency Response and Responder Safety Division. Disclaimer The information in this report is based upon dispatch records, audio recordings, witness statements, and other information that was made available to the National Institute for Occupational Safety and Health (NIOSH). Information gathered from witnesses may be affected by recall bias. The facts, contributing factors, and recommendations contained in this report are based on the totality of the information gathered during the investigation process. This report was prepared after the event occurred, includes information from appropriate subject matter experts, and is not intended to place blame on those involved in the incident. Mention of any company or product does not constitute endorsement by NIOSH, Centers for Disease Control and Prevention (CDC). In addition, citations to websites external to NIOSH do not constitute NIOSH endorsement of the sponsoring organizations or their programs or products. Furthermore, NIOSH is not responsible for the content of these websites. All web addresses referenced in this document were accessible as of the publication date.
FD06030 | 2024_美国_NIOSH_face202403.pdf
分类:06_境外及港澳台调查报告 | 年份:2024 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
Page i Career Firefighter Seriously Injured During Search Operations in a Residential Structure Fire – Oregon Executive Summary On May 30, 2024, a 33-year-old career firefighter (E31FF1), was seriously injured during flashover while conducting search operations in a one-story residential structure. A second firefighter (E31FF2), partnered with E31FF1, also suffered injuries during the event. At 21:02 hours, multiple 9-1-1 calls were received reporting a structure fire. Several of the calls reported occupants in the structure. The following units were dispatched: Photo 1: Side Alpha of the structure post-fire. (Courtesy of the fire department) Engine 31 (E31), Engine 74 (E74), Engine 73 (E73), Engine 71 (E71), Truck 71 (T71), and Battalion Chief 7 (BC7). Rescue 31 (R31) was also added. At 21:07 hours, E31 arrived on-scene. The E31 officer gave a quick size-up and assumed Command. E31’s crew, E31FF1 and E31FF2, were assigned fire suppression. As they were preparing to enter the structure, multiple civilians indicated a child with disabilities was trapped in the home. They decided to make a quick entry without a hoseline from the Side Alpha entry door. R31 arrived on-scene and was assigned to proceed with establishing a backup hoseline. Command reported E31’s change of assignment confirming they were not in possession of a hoseline when they entered the structure. Command then ordered R31 to perform fire suppression; however, there was a delay in R31 initiating a fire attack. The occupant approached R31’s crew frantically telling them her child was in the structure. As an E31 crew entered the structure, they traveled down a center wall and made a right turn to a hallway. As they proceeded down the hallway, they encountered a bedroom on the right side (Side Alpha). E31FF2 entered the first bedroom on Side Alpha while E31FF1 proceeded to look in the second bedroom located on Side Alpha/Delta corner. Conditions were rapidly changing and E31FF1 informed E31FF2 that “we need to get out of here.” During this time, an R31 crew retrieved and put a hoseline in service outside the structure, but there was no water pressure. The preconnected hoseline was kinked at the REPORT F2024-03 • April 2025
Page ii Career Firefighter Seriously Injured During Search Operations in a Residential Structure Fire – Oregon Report # F2024-03 discharge located on the right side of the pumper. As E31’s crew started to exit the structure they traveled down the hallway toward Side Bravo. A flashover occurred with fire traveling throughout the entire interior open space consisting of the living room, dining area, and kitchen. When E31FF2 got to the end of the hallway he turned left, leading him to the Side Alpha entry door exiting the structure. However, E31FF1 became disoriented and traveled across the living room toward the Side Bravo wall. Becoming more confused and disoriented he reversed direction, returning down the hallway, until he got to the end. He reentered the bedroom at the Side Alpha/Delta Corner which he was searching previously and exited out of the bedroom window. Once on the exterior of the building, he was treated by advanced life support (ALS) personnel and was transported to a hospital burn center. The fire was extinguished, and no occupants were inside the structure. E31FF1 sustained third degree burns covering 45% of his body. Contributing Factors • Size-up and risk assessment • Risk-benefit analysis • Fire behavior/fire dynamics and tactics • Freelancing/fireground operations procedures • Incident Safety Officer (ISO) • On-scene radio communications • Uncoordinated ventilation by occupants/flow path. Key Recommendations Fire departments should ensure: • Initial and ongoing size-ups and risk assessments are conducted throughout the incident. • Initial arriving firefighters to a fire with a report of trapped occupant(s) consider the risk- benefit analysis of commencing a search versus committing to fire suppression operations, if staffing is limited. • Firefighters and fire officers are trained in fire dynamics, recognition of flow paths, and interior fire attack techniques utilizing door control. • Fireground operations procedures are developed, trained on, and followed by fire officers and firefighters. • Response plans include a dedicated and trained ISO. • Firefighters protect new and older radios and cables by wearing radio straps under their turnout coat, with the radio extended below the bottom of the coat and the antenna tilted away to protect the cable from damage. • Fire prevention efforts educate the community to help change knowledge, attitudes, and behaviors that can reduce risks, injuries, and fires within the community.
Page iii Career Firefighter Seriously Injured During Search Operations in a Residential Structure Fire – Oregon Report # F2024-03
The National Institute for Occupational Safety and Health (NIOSH) initiated the Fire Fighter Fatality Investigation and Prevention Program to examine deaths of fire fighters in the line of duty so that fire departments, fire fighters, fire service organizations, safety experts and researchers could learn from these incidents. The primary goal of these investigations is for NIOSH to make recommendations to prevent similar occurrences. These NIOSH investigations are intended to reduce or prevent future firefighter deaths and are completely separate from the rulemaking, enforcement, and inspection activities of any other federal or state agency. Under its program, NIOSH investigators interview persons with knowledge of the incident and review available records to develop a description of the conditions and circumstances leading to the deaths in order to provide a context for the agency’s recommendations. The NIOSH summary of these conditions and circumstances in its reports is not intended as a legal statement of facts. This summary, as well as the conclusions and recommendations made by NIOSH, should not be used for the purpose of litigation or the adjudication of any claim. For further information, visit the program at www.cdc.gov/niosh/firefighters/fffipp/ or call 1-800-CDC-INFO (1-800-232-4636).
Career Firefighter Seriously Injured During Search Operations in a Residential Structure Fire – Oregon
Page 1 REPORT F2024-03 • April 2025 Introduction On May 30, 2024, a 33-year-old firefighter (E31FF1) was seriously injured during a rapid-fire progression while searching for a reported trapped child in a residential structure fire. His injuries consisted of burns to 45% of his body. E31FF1’s partner was a 28-year-old firefighter (E31FF2) and was injured with minor burns to his upper body. On June 4, 2024, the chief of the fire department notified the National Institute for Occupational Safety and Health (NIOSH) of this serious injury (SI) incident and requested an investigation. On July 14-19, 2024, two investigators from the NIOSH Fire Fighter Fatality Investigation and Prevention Program (FFFIPP) along with a representative from the International Association of Firefighters (IAFF) traveled to Oregon to investigate this SI incident. The investigators conducted interviews with command officers, fire officers, firefighters, and other emergency personnel who were on-scene during the response. Also, the investigators inspected the personal protective equipment (PPE) used by the firefighters and reviewed fire department standard operating guidelines (SOGs), training, dispatch, and other records. Fire Department The career fire department in this SI incident has a 60 square mile jurisdiction, serves a population of 110,000 residents, responds to an average of 22,000 calls annually, and provides emergency medical services (EMS). The fire department is comprised of 114 uniformed personnel and seven staffed stations. There are three shifts (A, B, and C) which operate on a 24-hours on, 72-hours off, 48-hours on, 72-hours off schedule. Each shift is led by a battalion chief and includes station captains, lieutenants, and firefighters. The fire department is led by a fire chief and assistant chief.
Divisions overseen by the assistant chief include: • Emergency operations division: Responsible for emergency medical calls, fire suppression services, and specialized responses including confined space, high angle rope rescue, structural collapse, water rescue, hazardous materials response, and wildland firefighting. • Training and safety division: Responsible for providing the department’s minimum training standards for all levels of certifications. • Life safety division: Responsible for applying fires codes to new construction, ensuring appropriate fire access, water supply, safety features, including fire alarm systems, and sprinklers systems are code compliant. The fire marshal leads the division, which handles all fire investigations, determining cause for known arson fires, significant fire loss, and fire fatalities.
Page 2 Career Firefighter Seriously Injured During Search Operations in a Residential Structure Fire – Oregon Report # F2024-03 Training, Education, and Professional Development The fire department maintains a training division that provides initial training and continuing skills development for all firefighters, fire officers, and EMS personnel. Newly hired firefighters go through a 13-week academy at the training center and follow the curriculum in NFPA 1001 Firefighter Task book, which was adopted by Oregon Department of Public Safety. Upon completion, new firefighters are paired with a senior firefighter and spend the next four shifts at a fire station. After four shifts with a senior firefighter, the new firefighters are deemed fit to be the lone firefighter in the back of an apparatus. After the training academy, firefighters receive a minimum of 60 hours of fire training every two years. All firefighters in the department are trained at the minimum level of Emergency Medical Technician (EMT) Basic through state certification. All engine companies are ALS units, which means each has a firefighter/paramedic on board.
E31FF1 had three years of total fire service with the department. He maintained training in and held numerous certifications as Fire Fighter I, Fire Fighter II, Fire Apparatus Driver/Operator, Hazmat Awareness, and EMT provider. Apparatus, Staffing, and Communications At 21:03 hours, the following units were dispatched for Box 3118:
Apparatus Staffing Arrival On-Scene Engine 31 (E31) 4 21:07 Rescue 31 (R31) added 2 21:07 Battalion Chief 7 (BC7) 1 21:08 Engine 71 (E71) 3 21:08 Engine 74 (E74) 3 21:09 Truck 71 (T71) 4 21:09 Engine 73 (E73) 3 21:10
The flashover in this incident occurred at 21:08 hours, prior to the arrival of five of the dispatched units. Building Construction The one-story residential structure was a type V, wood-frame constructed building (see Photos 2 and 3). It was 936 sq ft and built in 1956. There was a 992 sq ft attached garage on the Bravo/Charlie corner of the building. In 2010, the garage was converted into a fully functional residence. There was no access from the main home to the converted garage. The fire building contained three bedrooms and one full bathroom. The living room, dining room, and kitchen were designed with an open floor plan. The interior finishes consisted of gypsum board walls and vinyl laminated flooring.
Page 3 Career Firefighter Seriously Injured During Search Operations in a Residential Structure Fire – Oregon Report # F2024-03
Personal Protective Equipment At the time of the SI incident, the seriously injured firefighter (E31FF1) was wearing full structural firefighting turnout gear and a NIOSH Approved® SCBA. The investigators examined and photographed the PPE (see Photos 4a, 4b, and 4c). Investigators noted that the portable radio worn by E31FF1 was worn in a radio pocket of the turnout coat with the remote speaker microphone (RSM) cable positioned around the firefighter’s collar. This positioning first, directly exposed the cable to fire conditions and second, caused the radio to unintentionally transmit, which rendered the channel useless for fireground communications. Extensive thermal damage was noted to both the portable radio and RSM. Photo 2: Side Alpha of the structure pre-fire. (Courtesy of the fire department) Photo 3: Side Charlie of the structure pre-fire. (Courtesy of the fire department)
Page 4 Career Firefighter Seriously Injured During Search Operations in a Residential Structure Fire – Oregon Report # F2024-03
Weather Conditions On May 30, 2024, at 20:53 hours, the weather condition was fair, winds out of the Northwest at 9 mph with no reported wind gust. The temperature was 60°F, the dew point was 40°F, the humidity was 55%, and there was no precipitation in the last 24 hours leading up to the incident [Weather Underground 2024]. Investigation At 21:02 hours, the first of several 9-1-1 calls were received by dispatch reporting a one-story residential structure on fire. The initial condition was described by the caller as smoke coming from the structure. Additional calls were received with many of the callers unsure of the exact address and indicating they saw a person in the front door. At 21:03, hours, Box 3118 was dispatched for a structure fire. The dispatcher, unable to determine the exact address, shared two possible locations. E31, E74, E73, E71, T71 and BC7 were dispatched with Operations 4 as the designated radio channel. At 21:05, R31 requested to be added to the assignment. At 21:06 hours, dispatch provided an update regarding the correct location and the report of possible people inside the structure. Medic 346 was also added to the assignment. Prior to the arrival of the responding units, occupants attempted to perform ventilation to air out the building which inadvertently facilitated a significant change in fire behavior. Photos 4a, b, and c: E31FF1’s structural turnout gear (4a), gloves (4b), and portable radio showing extent of damage (4c). (Courtesy of NIOSH)
Page 5 Career Firefighter Seriously Injured During Search Operations in a Residential Structure Fire – Oregon Report # F2024-03 E31 arrived on-scene at 21:07 hours, reporting a one-story wood-frame house with smoke showing from Side Alpha. The E31 officer established Command and began to operate from the inside of E31’s cab. Command ordered E31’s crew, consisting of E31FF1 (seriously injured firefighter) and E31FF2 (injured firefighter), to perform fire suppression. Additionally, Command assigned R31 to establish a backup hoseline. As E31’s crew exited the unit, one civilian told them there was a child with disabilities in the bedroom on Side Alpha. At the same time, two other civilians notified Command that there were people inside the house. As the incident continued, the civilians began to scream in both English and Spanish about the trapped occupants which added stress to the firefighters operating on-scene. Based upon these reports, E31FF1 and E31FF2 donned their SCBA facepieces at the front door of Side Alpha. The two firefighters went into “rescue mode” to enter and rapidly search the structure without the protection of a hoseline. As E31FF1 and E31FF2 prepared to enter the structure (see Photo 5), R31 arrived on-scene. After hearing reports of a trapped child, a R31 firefighter (R31FF1) went to Side Charlie without notifying Command. Once he arrived on Side Charlie, a bystander stated there was a child in the bedroom that was hearing impaired. R31FF1 entered the structure on Side Charlie searching for the child. R31FF2 proceeded to E31 as E31’s driver/operator (E31DO) pulled a 1¾ hoseline from the officer’s side of the crosslay. The line was severely kinked due to failure of the webbing that secures the hose bed during travel releasing from the retention ring. As E31FF1 and E31FF2 entered the structure, Command realized the firefighters did not have a hoseline. Command made an announcement on the radio stating the E31 crew entered the structure without a handline and requested R31 to perform fire suppression on Side Alpha. At the same time, R31FF1 observed worsening conditions, exited Side Charlie, and returned to Side Alpha. E31FF1 and E31FF2 proceed through the front door and made their way along the righthand wall of the open living room to reach a hallway (see Diagram 1). They made a right turn down the hallway. E31FF2 entered a bedroom on the right side of the hallway (Side Alpha) to conduct a search. While he was searching the bedroom, E31FF1 remained in the hallway but proceeded further down to look in the next bedroom (Alpha/Delta corner). He observed worsening conditions inside with a rapid increase in heat as firefighters on the outside observed the smoke coming from the Side Alpha door change from gray to black with a glow visible below the smoke layer. E31FF1 returned to the first bedroom and told E31FF2 that they need to exit the structure. E31FF1 led the way with E31FF2 following after exiting the bedroom. At the same time, E31DO charged the handline pulled from the crosslay. R31FF2 advised that there was no pressure in the line. E31FF1 followed the righthand wall of the hallway, entered the middle of the living room, and became disoriented. E31FF2 followed the lefthand wall (keeping one shoulder on the wall) of the hallway, Photo 5: E31FF1 and E31FF2 preparing to enter the structure. (Courtesy of the fire department)
Page 6 Career Firefighter Seriously Injured During Search Operations in a Residential Structure Fire – Oregon Report # F2024-03 making the left when entering the living room, and exited through the Side Alpha door in a standing position. E31FF1 reversed direction and proceeded down the hallway towards the second bedroom that he previously attempted to search (Side Alpha/Delta corner). BC7 arrived on-scene and assumed Command. He directed E31’s officer to join his crew for fire suppression. E31FF2 proceeded to Side Bravo to observe conditions where he was asked whether E31FF1 was also out of the structure. Having observed another firefighter on Side Alpha, he indicated that E31FF1 was clear. E71 arrived on-scene and began to secure a water supply to the hydrant and assist with fire suppression. The handline R31FF2 operated on Side Alpha still had no pressure. He was joined with E31FF2 and an E71 firefighter. The E31DO increased discharge pressure to fix the issue as T71 arrived on-scene and was assigned primary search. They proceeded with flaking out the hose with little results. It was determined the hose was kinked at the preconnected hoseline at the discharge located on the officer’s side of E31. Engine 74 arrived on-scene and was tasked with providing a 360 size-up. An unintelligible radio transmission was heard from E31FF1 with an open mic that lasts 55 seconds. Dispatch confirmed to Command that an E31 radio had an open mic which disabled all fireground communications. E74 firefighters proceeded with their size-up, moving counterclockwise (from Side Delta to Side Charlie). At the same time, E31FF1 exited the structure through the bedroom 2 window of Side Alpha T71 who had been advised there was a trapped child in the bedroom of Side Alpha proceeded to the window of bedroom 2 and cleared it with a hook with the intent of entering for a search. Taking the window caused the smoke layer to transition to flaming combustion. Based upon conditions observed, they decided to enter the structure from Side Charlie instead. Dispatch again relayed that an E31 radio had an open mic. E31FFI proceeded to the Side Alpha/Bravo corner and was met by the E31 officer who was checking on him based on his visual condition. At 21:10 hours, E31’s officer radioed Command that he had a firefighter who needed immediate medical attention. E73 arrived on-scene, taking the medical assignment, as Command requested a second alarm. They rushed to E31FF1 with ALS equipment. Engine 74 firefighters pulled a booster line from E31 and applied water to E31FF1 to cool down his turnout gear and SCBA. With E73 firefighters, they began to remove his PPE and cut his turnout pants off. He was placed on oxygen by a non-rebreather mask while waiting for Medic 340 to arrives on- scene. At 21:13 hours, Medic arrived and E31FF1 was loaded and transported to a hospital burn center for his injuries. The fire was soon declared under control with additional searches not finding the reported trapped child.
Page 7 Career Firefighter Seriously Injured During Search Operations in a Residential Structure Fire – Oregon Report # F2024-03
Fire Cause and Origin According to the fire department’s life safety division, the fire was started when a burning candle ignited plastic shower curtains in the bathroom. Prior to the arrival of the responding units, occupants attempted to perform ventilation to air out the building which inadvertently facilitated a significant change in fire behavior which led to the flashover. Contributing Factors Occupational injuries and fatalities are often the result of one or more contributing factors or key events in a larger sequence of events that ultimately result in serious injuries or fatalities. NIOSH investigators identified the following items as key contributing factors in this SI incident that ultimately led to the SI:
• Size-up and risk assessment • Risk-benefit analysis • Fire behavior/fire dynamics and tactics • Freelancing/fireground operations procedures • ISO • On-scene radio communications • Uncoordinated ventilation by occupants/flow path Diagram 1: Floor plan, view from Side Alpha. (Courtesy of the fire department)
Page 8 Career Firefighter Seriously Injured During Search Operations in a Residential Structure Fire – Oregon Report # F2024-03 Cause of Serious Injury According to the fire department, E31FF1 sustained third degree burns covering 45% of his body due to the flashover. Recommendations Fire departments should ensure:
Recommendation #1: Initial and ongoing size-ups and risk assessments are conducted throughout the incident. Discussion: Dispatch advised responding units to this SI incident there was a possibility of occupants inside the structure. Once the units arrived, an occupant indicated a child with disabilities was trapped in the structure. Additional bystanders approached fire personnel reporting trapped occupants. There was a rapid entry into the structure without the protection of a hoseline. The speed of the decision prevented a full scene-size up and risk assessment to be completed prior to entry. Once C7 arrived, he gave an order to E74 to conduct a 360; however, the flashover had already occurred, and no updated fire conditions were transmitted as a result of the 360.
Continuous communication supports effective risk assessments. It also allows the incident commander and all personnel operating at an incident to be aware of changing conditions and adjust to avoid hazards or mitigate risks. Performing the 360° is an important component of the scene size-up and can be used in the risk assessment. The International Association of Fire Chiefs’ Rules of Engagement for Structural Firefighting recommends that the first rule for ICs is to rapidly conduct or obtain a 360° situational size- up of the incident. Many incidents contain obstacles to prevent the viewing of all sides of a structure. This included the attached garage and fence that obstructed the view to Side Charlie. When the 360° reconnaissance is achieved, it provides the incident commander and personnel knowledge of the building layout, construction, access/egress points, fire location and direction of spread, and obstacles or hazards. It allows the incident commander and personnel to know how much air is entering the structure from existing openings and what options are available for future ventilation [NIOSH 2017].
Recommendation #2: Initial arriving firefighters to a fire with a report of trapped occupant(s) consider the risk-benefit analysis of commencing a search versus committing to fire suppression operations, if staffing is limited. Discussion: Ongoing research from the Fire Safety Research Institute (FSRI), a part of UL Research Institutes, shows the importance of getting effective water on the fire as quickly as possible from a position of advantage. If staffing and resources permit, both search and suppression operations should occur simultaneously and without delay. Should the initial arriving unit be limited in staffing, strategy and tactics may need to incorporate sequential versus simultaneous operations until more personnel are on the scene and available. As such, a decision will need to be made as to whether the personnel and resources will commence a search for the reported occupant or engage in fire suppression [Weinschenk et al 2022; Regan et al. 2020; Zevotek 2018].
Page 9 Career Firefighter Seriously Injured During Search Operations in a Residential Structure Fire – Oregon Report # F2024-03 Prior to making a decision to commence a search, possibly without the protection of a hoseline, several things need considered:
• The current fire location and progression in the structure • The reported location of the occupant(s) • The estimated arrival of the next unit capable of beginning suppression operations • The ability to isolate and compartmentalize spaces during the search
If the first arriving fire officer decides to commence a search without the protection of a hoseline, in lieu of suppression operations, the following actions should occur:
• Communicate this decision via fireground radio including the need for immediate suppression operations upon the arrival of the next unit capable of doing so • Upon entering the structure, attempts should be made to enact door control at the entry point to limit the available fresh air and subsequent fire growth • As the search crews move throughout the structure, all compartmentalizable spaces should be isolated if possible • If the fire room(s) are located during the search, attempts should be made to isolate the fire areas from the remainder of the searchable space • Pressurized water can(s) should be brought with the search crew to provide protection as needed
Recommendation #3: Firefighters and fire officers are trained in fire dynamics, recognition of flow paths, and interior fire attack techniques utilizing door control. Discussion: In 2009, the fire academy removed training on fire behavior and fire dynamics from its curriculum to accommodate a shortage of instructors. Upon observing the location of the fire, E31FF1 did not close the bathroom door to isolate it. R31FF1 entered the Side Charlie of the structure and other firefighters cleared additional windows which created additional flow paths. Research has been conducted by NIST, FSRI, and the International Society of Fire Service Instructors on modern fire dynamics involving heat release rates, new building construction techniques, and the composition of modern home furnishings. In years past, these home furnishings were largely composed of natural products such as wood and cotton. Today, many of these home furnishings are now manufactured using petroleum-based synthetic materials that generate high heat release rates as well as toxic and flammable smoke. Consequently, common, everyday structure fires can create an oxygen depleted environment with fuel rich smoke that can sustain combustion given the appropriate mixture of air and heat. A flow path is defined by NFPA as “the movement of heat and smoke from the higher pressure within the fire area towards the lower pressure areas accessible via doors, window openings, and roof structures” [NFPA 1410 2020]. Flow paths consist of an inlet and an exhaust with the direction of travel being determined by pressure. Heat and smoke in a high-pressure area will travel to an area of lower pressure. It is possible to have multiple flow paths within a structure dependent upon the size of the building, openings, closures such as fire doors, and overall structure design. Personnel working in the
Page 10 Career Firefighter Seriously Injured During Search Operations in a Residential Structure Fire – Oregon Report # F2024-03 flow path (between the seat of the fire and the exhaust) are operating in a significantly risky environment. Coordinated ventilation tactics should be utilized to redirect the flow path from interior operations. The International Fire Service Training Association (IFSTA) notes in the 7th Edition of the Essentials of Firefighting that, “when firefighters advance a hoseline or ventilate windows to make entry into a building, they establish new flow paths between the fire compartment (in this case the location) and exterior vents of the building” (see Figure 1) [IFSTA 2018].
Figure 1. Movement of Smoke. (Courtesy of IFSTA)
When identifying the flow path within a structure, personnel should be mindful to wind conditions. Wind can create pressure changes within a structure or building which could spread both smoke and fire into non impacted parts of the structure or building. Interior firefighting personnel should be mindful to these changes in conditions that place the interior firefighting personnel in the exhaust portion of the flow path. Sudden changes in temperature and smoke are factors that should alert interior personnel of imminent changes to conditions. Understanding that modern fuel loads inside of residential structures creates flammable gasses that will sustain combustion interior fire attacks should utilize thermal imaging devices. Water should be applied to the fire as quickly as possible utilizing the reach of an effective fire stream that is delivering an appropriate volume of water to overcome the heat release rate. In some cases, it may be appropriate to introduce water from the exterior of a structure through a window/door with an attack line or begin the fire attack from the exterior with a coordinated blitz attack flowing 300 gallons per minute or greater before committing personnel to the interior. Fire departments should be cooling interior spaces from the safest and closest location possible, especially in vent limited spaces. Maintaining door control is critical during interior operations. Opening a door changes the ventilation profile of the structure and may have an adverse effect on fire behavior [IFSTA 2013]. Controlling the door limits the fresh air available to the fire and reduces the flow path. Door control is a critical
Page 11 Career Firefighter Seriously Injured During Search Operations in a Residential Structure Fire – Oregon Report # F2024-03 component of coordinated ventilation and fire attack. Once water is applied to the fire, it is no longer ventilation limited. This allows for more rapid and safer ventilation [Gray and Norwood 2024]. The use of a pressurized water extinguisher to reduce the amount of fire to gain control of the fire room door can be effective. This would isolate the fire. Even if the door was partially burned through, it would limit fire growth and spread and provide time for primary search.
Fire departments can develop training from available resources or requisition existing training. Fire behavior/fire dynamics trainings are available through FSRI, fire academies, and private fire training organizations. Fire departments can develop SOGs using the information and response techniques learned from these trainings.
Recommendation #4: Fireground operations procedures are developed, trained on, and followed by fire officers and firefighters. Discussion: During this SI incident, multiple firefighters engaged in freelancing and employed a number of different tactics and strategies based upon individual decisions. This began with the two firefighters going into “rescue mode” to enter and rapidly search the structure without the protection of a hoseline. NIOSH investigators found that “rescue mode” was a tactic that was not defined in any procedure or policy for fireground operations. After realizing he was in danger, E31FF1 did not activate his PASS device or employ Mayday/firefighter survival techniques. Fire departments should develop fireground operations procedures that are clear and understood by all firefighters. Established procedures create better structure and accountability of actions during an incident. These procedures should include the following areas relative to this incident: Transfer of Command When command is transferred, it is the responsibility of the IC to communicate critical information to the person taking over. This includes the current accountability, assignments, and actions of on-scene personnel; current incident conditions, incident conditions, safety concerns, and benchmarks [NIOSH 2024]. This includes any other critical information that may have been missed while other units are enroute to the incident. Communications Effective fireground radio communication is an important tool to ensure fireground command and control as well as helping to enhance fire fighter safety and health. The radio system must be dependable, consistent, and functional to ensure that effective communications are maintained, especially during emergency incidents. Key components for effective fireground communications include requirements for transmitting strategic modes of operation and situational reports; personnel accountability reports, emergency traffic including Mayday; and receipt of critical transmissions [NFPA 1550 2024].
Page 12 Career Firefighter Seriously Injured During Search Operations in a Residential Structure Fire – Oregon Report # F2024-03 Mayday/Firefighter Survival Firefighters should be trained in how to call a Mayday when in danger. Any delay in calling a Mayday reduces the chance of survival and increases the risk to other firefighters trying to rescue the “downed” firefighter. Firefighters should have 100% confidence in their competency to declare a Mayday and follow the GRAB LIVES Mayday procedures. Fire departments should ensure that any personnel who enter a hazard zone have been trained and are proficient in Mayday competencies [IAFF 2010a; 2010b]. Training on Fireground Operations To ensure the proficiency and competency of fire department members, fire departments should conduct annual training and skills evaluations to verify firefighters understand the established fireground operations procedures. NFPA 1550, Standard for Emergency Responder Health and Safety, requires a fire department to establish and maintain a training, education, and professional development program with the goal of preventing occupational deaths, injuries, and illnesses. This ensures member competencies are maintained to execute all responsibilities effectively, efficiently, and safely [NFPA 1550 2024]. NFPA 1410, Standard on Training for Emergency Scene Operations, defines basic evolutions, which are adaptable to local conditions and serves as a method for the evaluation of minimum acceptable job performance during training for fire suppression and rescue activities [NFPA 1410 2020]. Proficiency training for fireground operations and emergency incidents should occur annually. This training should include scene size-up, situational awareness, use of an incident management system, personnel accountability system, strategy and tactics, search and rescue, hoseline operations, ladder operations, ventilation, thermal imaging cameras, fireground communications, use of rapid intervention teams, and Mayday operations [NIOSH 2024]. Recommendation #5: Response plans include a dedicated and trained ISO. Discussion: During this SI incident, the first IC operated from the cab of E31. Additional firefighters on- scene were tasked with fire suppression and search. A number of firefighters began tasks without notifying the incident commander of their actions or where they would be operating. At no time was a dedicated ISO established to supervise operations, fire behavior, and conduct accountability. An ISO should be trained to NFPA 1550 which defines the requirements for the IC, including establishing a fixed command post, personnel accountability, the use of staff aides and RICs, and the appointment of an ISO and assistant safety officer(s) (as needed). The standard addresses the expectations and authority of the ISO. Expectations and authority include determining hazardous incident conditions, advising the incident commander to modify control zones or tactics to address corresponding hazards, communicate fire behavior and forecast growth, and estimate building/structural collapse hazards. This also includes the authority to stop or suspend incident operations based on imminent threats posed to firefighter safety [NFPA 1550 2024]. The ISO should be separate from the IC, operations, or accountability positions so they can focus on their responsibilities and the primary objective of continually assessing any and all on-scene hazards to firefighter life and safety. A personnel accountability system is a system that readily identifies both the location and function of all members operating at an incident scene [NFPA 1550 2024]. This system is implemented during an
Page 13 Career Firefighter Seriously Injured During Search Operations in a Residential Structure Fire – Oregon Report # F2024-03 incident to collect and maintain the status and location of the resources working in, or potentially working in, an immediately dangerous to life and health IDLH environment. All members operating at an incident are responsible for understanding and participating in this system. The IC is responsible for but may delegate certain responsibilities to another person such as the ISO. An integral part of the accountability system is to make sure that the firefighters who are assigned and operating in the hazard zone are accounted for throughout the entire incident. A properly initiated and enforced personnel accountability system can enhance firefighter safety and survival [NIOSH 2024]. A functional personnel accountability system should have the ability to identify:
• Members operating in the hazard zone (who) • Where members are in the hazard zone (where) • Conditions in the hazard zone (conditions) • Actions used in the hazard zone (actions) • Paths of access and egress in and out of the hazard zone (exits) • RICs and their assignments
Different methods and tools are available for resource accountability, including: • Tactical worksheets • Command boards • Apparatus riding lists • Company responding boards • Electronic bar-coding systems • Accountability tags or keys
Recommendation #6: Firefighters protect new and older radios and cables by wearing radio straps under their turnout coat, with the radio extended below the bottom of the coat, and with the antenna tilted away to protect the cable from damage. Discussion: In this incident, E31FF1 was able to self-rescue out of a window but sustained significant burn injuries. The portable radio he had was placed in a radio pocket of his turnout coat with the RSM cable positioned around his collar. This positioning directly exposed the cable to fire conditions, eventually causing the radio to unintentionally transmit, rendering the channel useless for fireground communications. Extensive thermal damage was noted to both the portable radio and RSM.
Portable radios serve as an essential safety device allowing each firefighter to immediately report, or be notified of, changing conditions and emergencies that can affect their survival. As such, it is critical firefighters understand the conditions in which these devices may fail and how to protect them. Between 2004 and 2014, NIST conducted studies to determine the effect of high temperatures (160°C/320°F) on portable radios. Some of these studies demonstrated that direct exposure to high temperatures can melt the RSM and cable, resulting in loss of functionality for interior firefighters and disabled broader fireground communications due to unintentional transmissions. In these studies, failures occurred most often when portable radios were worn on the exterior of structural firefighting turnout gear with the RSM cable directly exposed to high temperatures (which was also the case in this current SI incident) [NIST 2006]. NIST findings from user-centered interviews noted that firefighters reported
Page 14 Career Firefighter Seriously Injured During Search Operations in a Residential Structure Fire – Oregon Report # F2024-03 being aware that the RSM cable is known to melt in high temperature environments, with a number of firefighter fatalities related to failure of radios and subsequent loss of communications [NIST 2018]. These studies led to the development of NFPA 1802. The standard includes a requirement for portable radios and their accessories to withstand temperatures up to 500°F for five minutes [NFPA 1802 2021].
Radios meeting the NFPA 1802 standard were first certified in 2022. It is likely that older radios are still in use and may not offer the same heat tolerance as newer radios designed to meet the standard. Firefighters may employ additional protection or other tactics for both new and older radios and cables with PPE.
Based on other studies, the NFPA 1802 standard, and this SI incident, proper placement of portable radios entails wearing the radio on straps, under the turnout coat, and with the radio extended below the bottom of the coat with the antenna tilted away to protect the RSM cable from melting (see Photo 6). This placement of the portable radio allows the RSM cable to be protected from direct exposure. Additionally, this placement significantly reduces the possibility of an entanglement hazard involving the RSM cable and improves signal strength from the radio antenna. A 2013 report by the Fairfax County Fire & Rescue Department includes diagrams for proper wearing of a radio strap and portable radio for interior firefighting operations. Fire departments may consider equipping firefighters with radio straps and updating standard operating procedures or guidelines to include proper use during interior firefighting operations. Fire academies and fire instructors may opt to include radio strap use in both entry level and advanced firefighter training.
Recommendation #7: Fire prevention efforts educate the community to help change knowledge, attitudes, and behaviors that can reduce risks, injuries, and fires within the community. Discussion: In this incident, occupants attempted to perform ventilation to air out the building which inadvertently facilitated a significant change in fire behavior which led to the flashover.
Fire and life safety education is a critical element of community-risk reduction. This effort works to change knowledge, attitudes, and behaviors among community residents to reduce risks, injuries, and fires [IFSTA 2015a]. Fire departments act on this effort by training firefighters and other personnel as Fire and Life Safety Educators (FLSEs). FLSEs coordinate and deliver educational programs that teach people about a particular hazard and how to reduce or prevent the risks [NFPA 1030 2024]. Photo 6: Firefighter wearing portable radio on a strap under coat. (Courtesy of the National Volunteer Fire Council)
Page 15 Career Firefighter Seriously Injured During Search Operations in a Residential Structure Fire – Oregon Report # F2024-03 Fire and life safety education initiatives can teach community members about fire and injury prevention, including what actions they can take during an emergency. Example topics of these programs include: • The importance of smoke alarms to reduce deaths in structure fires • The use of child safety seats to lessen injuries of children involved in vehicle accidents • The need for carbon monoxide detectors and proper use of gas-powered appliances • Closing bedroom doors while sleeping or closing doors upon egressing during a fire incident Specific to this incident, an applicable topic could be teaching community members to close doors during an evacuation to limit oxygen ingress and to report fires as soon as possible to get firefighters dispatched immediately. Fire Safety Research Institute’s ‘Close Your Door’ encourages those both trapped in a room during a fire as well as those who can safely leave a home to close as many doors as possible to limit the growth and spread of the fire. The webpage, https://fsri.org/programs/close-before- you-doze offers a series of free resources, including videos that fire departments can use to educate the public. These types of initiatives can be provided by fire departments in the form of scheduled lectures at community centers or fire stations, school visits by firefighters for fire prevention week, or through posting informational graphics on social media [IFSTA 2015a]. References Fairfax County Fire & Rescue Department [2013]. Portable radio placement in the IDLH. Fairfax, VA: Fairfax County Fire & Rescue Department, Communications Division. Gray S and Norwood PJ [2024]. Modern firefighting tactics in residential structures: Ventilation, coordination, and control. Fire Engineering. IAFF [2010a]. IAFF Fire Ground Survival Training Program. Washington, DC: International Association of Fire Fighters. IAFF [2010b]. Self-survival procedure. Washington, DC: International Association of Fire Fighters. IFSTA [2013]. Essentials of fire fighting. 6th ed. Stillwater, OK: International Fire Service Training Association. IFSTA [2015a]. Fire and life safety educator. 3rd ed. Stillwater, OK: International Fire Service Training Association. IFSTA [2018]. Essentials of fire fighting. 7th ed. Stillwater, OK: International Fire Service Training Association. NFPA [2020]. NFPA 1410, Standard on training for emergency scene operations. Quincy, MA: National Fire Protection Association. NFPA [2021]. NFPA 1802, Standard on two-way, portable RF voice communications devices for use by emergency services personnel in the hazard zone. Quincy, MA: National Fire Protection Association.
Page 16 Career Firefighter Seriously Injured During Search Operations in a Residential Structure Fire – Oregon Report # F2024-03 NFPA [2024]. NFPA 1550, Standard for emergency responder health and safety. Quincy, MA: National Fire Protection Association. NFPA [2024]. NFPA 1030, Standard for professional qualifications for fire prevention program positions, Quincy, MA: National Fire Protection Association. NIOSH [2017]. NIOSH fire fighter fatality investigation helps incident commander choose strategy and tactics to control flow path and protect fire fighters. By Bowyer M., Loflin M., Merinar T., Miles S., Moore P., Wertman S., Orr B., and Webb S. Morgantown, WV: U.S. Department of Health and Human Services, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health, DHHS (NIOSH) Publication 2017–200. NIOSH [2024]. Volunteer firefighter killed after becoming trapped at an assisted living facility fire and two firefighters injured – New York. By Loflin M and Attwood W. Morgantown, WV: U.S. Department of Health and Human Services, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health, F2021-10. NIST [2006]. NIST Technical note 1477: Testing of portable radios in a fire fighting environment. By Davis WD, Donnelly MK, and Selepak MJ. Gaithersburg, MD: U.S. Department of Commerce, National Institute of Standards and Technology. NIST [2018]. Voices of first responders -identifying public safety communications problems: Findings from user-centered interviews phase 1, volume 1. By Choong YY, Dawkins S, Furman S, Greene KK, Prettyman SS, and Theofanos MF. Gaithersburg, MD: U.S. Department of Commerce, National Institute of Standards and Technology. Regan J, Bryant J, and Weinschenk C [2020]. Analysis of the coordination of suppression and ventilation in single-family homes. Columbia, MD: UL Fire Safety Research Institute. SKCFTC [2023]. South King County Fire Training Consortium, Command Procedures: Structure Fires. Kent, WA. South King County Fire Training Consortium. March 2023. Weather Underground [2024]. Weather History. The Weather Underground. Date accessed: November 14, 2024. Weinschenk C and Stakes K [2022]. Analysis of search and rescue tactics in single-story single-family homes part III: Tactical considerations. Columbia, MD: UL Fire Safety Research Institute. Zevotek R, Stakes K, and Willi J [2018]. Impact of fire attack utilizing interior and exterior streams on firefighter safety and occupant survival: Full-scale experiments. Columbia, MD: UL Firefighter Safety Research Institute. Investigator Information This incident was investigated by Louis (Rick) Lago (former), Investigator, and Patrick R. Montague (former), Investigator, with the Fire Fighter Fatality Investigation and Prevention Program, Surveillance
Page 17 Career Firefighter Seriously Injured During Search Operations in a Residential Structure Fire – Oregon Report # F2024-03 and Field Investigations Branch, Division of Safety Research, NIOSH located in Morgantown, WV. Jeffrey Seaton, an expert in firefighter survival accompanied the team as a representative of the IAFF.
This investigation report was authored by Louis (Rick) Lago (former) and Dr. Wesley R. Attwood, Investigator and Program Advisor, with the Fire Fighter Fatality Investigation and Prevention Program, NIOSH. The report was also authored by Keith Stakes, Principal Engineer, Fire Safety Research Institute, part of the UL Research Institutes.
Dan Madrzykowski from the Fire Safety Research Institute, part of the UL Research Institutes, provided an expert review of the investigation report. A subject matter expert review was provided by Brian Chalfant, Staff Fire Instructor, Allegheny County Emergency Services – Fire Academy, Pennsylvania. The NFPA Emergency Response & Responder Safety Division provided a technical review. Additional Information Underwriters Laboratories (UL) The Fire Safety Research Institute (FSRI), part of the UL Research Institutes, continues to work with fire departments and fire service organizations to conduct research on fire dynamics, fire safety issues, and fire ground operations. Access to reports from completed studies and information from on-going studies can be found at https://fsri.org. Access to free online training on evidence-based firefighting (more than 30 course modules in all) can be found at https://training.fsri.org. Disclaimer The information in this report is based upon dispatch records, audio recordings, witness statements, and other information that was made available to the National Institute for Occupational Safety and Health (NIOSH). Information gathered from witnesses may be affected by recall bias. The facts, contributing factors, and recommendations contained in this report are based on the totality of the information gathered during the investigation process. This report was prepared after the event occurred, includes information from appropriate subject matter experts, and is not intended to place blame on those involved in the incident. Mention of any company or product does not constitute endorsement by NIOSH, Centers for Disease Control and Prevention (CDC). In addition, citations to websites external to NIOSH do not constitute NIOSH endorsement of the sponsoring organizations or their programs or products. Furthermore, NIOSH is not responsible for the content of these websites. All web addresses referenced in this document were accessible as of the publication date. NIOSH Approved is a certification mark of the U.S. Department of Health and Human Services (HHS) registered in the United States and several international jurisdictions.
FD06031 | 2024_美国_NIOSH_face202404.pdf
分类:06_境外及港澳台调查报告 | 年份:2024 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
Page i
27-Year-old Firefighter has Seizure then Dies of Cardiac Arrest while Responding to Residential Fire – Kansas Executive Summary On August 1, 2024, a 27-year-old male career firefighter (FF1) with no known medical conditions participated in a mutual aid response to a residential structure fire. FF1 was inside the building with an active fire for approximately 4 minutes before exiting the front door. Shortly after exiting, the firefighter appeared to have a seizure and collapse to the ground. Nearby firefighters who witnessed the seizure and collapse rushed to assist FF1. FF1’s gear and self-contained breathing apparatus (SCBA) were quickly removed, and an initial medical assessment found FF1 to be pulseless and apneic. Cardiopulmonary resuscitation (CPR) was initiated. The initial firefighters tending to FF1 were all basic emergency medical technicians (EMT-B). The first due engine, which was the initial interior fire attack crew, was advanced life support (ALS) equipped and had a firefighter paramedic (FFP) assigned to the crew but no ambulance for patient transport was immediately available. The FFP initiated and continued advanced cardiac care of FF1 until arrival of the ALS ambulance. While en-route, the cyanide antidote hydroxocobalamin was administered. FF1 regained a pulse enroute to the hospital but lost it as he was being taken into the emergency department (ED). The ED staff worked FF1’s resuscitation for approximately 15 minutes before he was pronounced dead. The Medical Examiners report listed FF1’s cause of death as “unspecified cardiac arrest sustained while fighting a fire”. Of note, FF1 had a syncopal event approximately 2 months prior but the cause was not identified, and no further medical evaluation was done. At the approximate time of arrival at the residential fire, the outdoor temperature was 96℉ with 44% humidity resulting in a heat index of 103.4℉. However, it is unknown if either the syncopal event or heat stroke was a factor in this death. Key Recommendations NIOSH offers the following recommendations to reduce the risk of sudden cardiac arrest among firefighters at this and other fire departments across the country. • Key Recommendation #1: Fire departments should consider implementing annual medical examinations as per National Fire Protection Association (NFPA) 1582 recommendations. • Key Recommendation #2: Fire departments should encourage members to reduce and if possible, eliminate intake of/exposure to known risk factors for adverse cardiovascular events and rhabdomyolysis. F2024-04 • February 2025
Page ii 27-Year-old Firefighter has Seizure then Dies of Cardiac Arrest while Responding to Residential Fire – Kansas Report # F2024-04 • Key Recommendation #3: Fire departments should increase awareness of conditions that increase risk of heat-related illness (HRI) and implement heat stress management policies to reduce those risks. • Key Recommendation #4: Ensure emergency medical service (EMS) with transport capability is on-scene at any fire or special operation location in the event emergency medical care and transport is needed. • Key Recommendation #5: Fire officers should ensure crew integrity when entering, operating in, and exiting from an environment immediately dangerous to life or health (IDLH). • Key Recommendation #6: Fire departments should provide physicians tasked with pre- employment and return to work medical evaluations, descriptions of the essential tasks and duties and not rely on the cadet/incumbent to relay this information. • Key Recommendation #7: Fire departments should ensure that a physician signs off on pre- employment and return to work evaluations.
The National Institute for Occupational Safety and Health (NIOSH) initiated the Fire Fighter Fatality Investigation and Prevention Program to examine deaths of fire fighters in the line of duty so that fire departments, fire fighters, fire service organizations, safety experts and researchers could learn from these incidents. The primary goal of these investigations is for NIOSH to make recommendations to prevent similar occurrences. These NIOSH investigations are intended to reduce or prevent future fire fighter deaths and are completely separate from the rulemaking, enforcement and inspection activities of any other federal or state agency. Under its program, NIOSH investigators interview persons with knowledge of the incident and review available records to develop a description of the conditions and circumstances leading to the deaths in order to provide a context for the agency’s recommendations. The NIOSH summary of these conditions and circumstances in its reports is not intended as a legal statement of facts. This summary, as well as the conclusions and recommendations made by NIOSH, should not be used for the purpose of litigation or the adjudication of any claim. For further information, visit the program Web site at www.cdc.gov/niosh/firefighters/fffipp/about.html or call toll free 1-800-CDC- INFO (1-800-232-4636).
27-Year-old Firefighter has Seizure then Dies of Cardiac Arrest while Responding to Residential Fire – Kansas
Page 1 F2024-04 • February 2025 Introduction On August 1, 2024, a 27-year-old male career firefighter (FF1) with no known medical conditions participated in a mutual aid response to a residential structure fire. FF1 belonged to Fire Department A (FD-A) which has multiple stations. FF1 was moved from his normally assigned FD-A station 1 to FD- A station 2 for that day due to staffing alignment. This was the first time FF1 worked from FD-A station 2. The structural fire was located in Fire Department B (FD-B)’s service area and FF1’s crew responded as part of a mutual aid agreement. The incident command for the fire was FD-B. FF1 was inside the building with an active fire for approximately 4 minutes before exiting through the front door. Shortly after exiting, the firefighter appeared to have a seizure and collapsed to the ground. During the investigation, the National Institute for Occupational Safety and Health (NIOSH) investigators interviewed the following people: • Chiefs of fire departments involved in the incident • Fire department staff and emergency medical service (EMS) personnel involved in the incident • County Medical Director • Fire Marshal • Medical Examiner The NIOSH investigator reviewed the following documents: • Standard operating procedures from FD-A and FD-B • Mutual aid agreements between involved departments • Narratives and incident reports from all departments involved • Incident location photos and schematics • Radio communication audio files from incident • Cyanokit training, assignment, and use protocols • FF1 Training Records
Page 2 27-Year-old Firefighter has Seizure then Dies of Cardiac Arrest while Responding to Residential Fire – Kansas Report # F2024-04 • FF1 helmet cam during August 1, 2024, residential fire response • Medical examiner’s report • Pre-hospital care reports and data from LifePak used by EMS staff in FF1’s resuscitation • Emergency Department (ED) records from 5/16/24 and 8/1/24 visits • Pre-employment medical evaluation • Incident/injury reports involving FF1 during his employment with FD-A Fire Departments FD-A is a career municipal fire department with approximately 500 members. FD-A has 22 stations, covering 168 square miles, and serving a population of over 490,000. FD-A responded to this incident under an automatic aid agreement. There were 3 fire departments involved in this incident. FD-B is a career department serving the county jurisdiction around the municipality of FD-A. The structure fire occurred in FD-B’s jurisdiction. FD-B had multiple apparatus respond to this incident. The Battalion Chief that assumed Incident Command (IC) is a member of FD-B. Fire Department C (FD-C) is a small city department within the same county as FD-A and FD-B. FD-C is a career department that also responded to this incident under an automatic aid agreement. Engine 1 (E1) from FD-C was the first engine company to arrive on-scene. E1 was ALS capable with equipment and a staffed firefighter/paramedic. The initial primary Incident Safety Officer was a Captain from FD-B. The interior Safety Officer was from FD-C. Membership and Training FD-A hiring process components consists of a two-part aptitude/interview process: • Phase 1 consists of a physical abilities evaluation in a group setting where candidates are individually scored and may qualify for phase 2 • Phase 2 is an individually tested and scored, multi-station obstacle course, modeled after the Candidate Physical Abilities Test (CPAT), and a panel interview In addition, applicants must submit to a background investigation and undergo a physical examination and lab screening. The physical examination is National Fire Protection Association (NFPA) 1582 compliant (Standard on Comprehensive Occupational Medical Program for Fire Departments) and is conducted by a city appointed physician. Once accepted, the recruit training academy is 22 weeks in length. Eight weeks are dedicated to Emergency Medical Technician training and certification. Fourteen weeks are dedicated to basic training in firefighting, special rescue, and hazardous materials. Recruits participate in ride-outs with operations companies during the academy.
Page 3 27-Year-old Firefighter has Seizure then Dies of Cardiac Arrest while Responding to Residential Fire – Kansas Report # F2024-04 Preplacement/Periodic/Return to Work Medical Evaluations At the time of FF1’s hire in 2019, FD-A required the pre-employment medical evaluation to include a physical exam, pulmonary function testing, blood tests (standard chemistry panel and complete blood count), urine drug screen, urinalysis, chest x-ray, lumbosacral spine x-ray, audiogram, functional capacity evaluation (FCE), cardiac treadmill stress test and completion of the Occupational Safety and Health Administration (OSHA) Respirator Clearance form. At the time of FF1’s hire through the period of his employment, there were no department requirements for annual medical examinations. The majority of FF1’s pre-employment evaluation was completed on February 19, 2019. The physical exam, blood tests, pulmonary function testing, x-rays, and cardiac treadmill test were all unremarkable. His urinalysis was positive for ketones but was otherwise normal. He was noted to have “good exercise tolerance” on his treadmill test and his functional capacity evaluation was reported in 2 components; The physical classification of the worker was designated as “very heavy”, and the physical demand classification of job was designated as “medium heavy”. These classifications were defined according to the table below (Table 1). The final determination of the FCE dated February 22, 2019, was that FF1 was “able to meet functional requirements of job based on tests completed”.
Light Light/Medium Medium Medium/Heavy Heavy Very Heavy Occasional (1%–33%) 20 lbs. 35 lbs. 50 lbs. 75 lbs. 90 lbs.
100 lbs.
Frequent (34%–66%) 10 lbs. 15 lbs. 25 lbs. 35 lbs. 50 lbs.
50 lbs.
Constant (67%–100%) Negligible 5 lbs. 10 lbs. 15 lbs. 20 lbs.
20 lbs.
It was noted on the Respirator Clearance form under job description that “a respirator job description was not provided by the Company and this recommendation is based solely upon history/physical information gained today”. The FD’s policy manual states that the “description of essential job tasks is included in position classifications associated with specific titles, or ranks, for each commissioned Fire Department position” It is unclear why these were not provided to the physician conducting FF1’s pre- placement medical evaluation. The final determination was that FF1 was cleared with “no restrictions of respirator use”. FF1 had 2 illness/injury incidents during his tenure at FD-A. The first incident occurred on July 15, 2020, during participation in a structure fire response when FF1 tripped over a hoseline and fell to the ground. During his fall, his bunker pants were pushed up above his knees, exposing his skin resulting in “slight burns to both shins” when he contacted the heated floor. He was treated at the local ED and discharged to return to work without restrictions. A return-to-work form dated the same day of the incident was completed confirming he was released back to full duty without restriction. The required work release form included a list of essential tasks and functional capabilities required for those tasks. The second incident was dated November 18, 2020, and was described as an inhalational exposure to COVID-19 occurring while engaged in CPR despite wearing proper personal protective equipment (PPE). The form does not list what PPE was worn, only that all personnel on 2 engine crews and EMS
Page 4 27-Year-old Firefighter has Seizure then Dies of Cardiac Arrest while Responding to Residential Fire – Kansas Report # F2024-04 crew were exposed/involved in this incident and “all engine 20 members were wearing proper PPE”. No treatment was documented. The form indicated FF1 was not admitted to a hospital and was not seen in the Occupational Medicine Facility. It is unknown if FF1 was subsequently tested for COVID-19 to determine if an infection resulted from that possible exposure. The form asked if work restrictions were prescribed by a clinician. The response to this question was “no” but the form was not signed by any physician, so it is unclear if a physician reviewed this incident report or if there was a reviewing physician and they did not sign the report. Wellness/Fitness Programs FD-A has no formal on-going wellness and fitness programs. The only mandated physical occurs at pre-employment. The department’s physical fitness training policy allows for one hour of physical training per 24-hour shift. Exercise equipment is furnished by the department. Investigation On August 1, 2024, at 07:00 hours, FF1 began his tour of duty on his regularly assigned shift and apparatus at FD-A station 1 on Engine 10 (E10). Soon after arrival at the firehouse, FF1 was reassigned to station 2 as Engine 2 (E2) driver in another part of the city. During the morning at station 2, FF1 checked out his equipment and apparatus, performed physical training which included an upper body weight workout of shoulder press and lateral pull-downs, and took two EMS calls on E2. After completing the second EMS call, FF1 went to lunch then picked up drinks and snacks at a store. During interviews, firefighters from both E10 and E2 stated that FF1 was his typical self, having no complaints and doing nothing out of the ordinary. The E2 crew was less familiar with FF1’s routines, but there was nothing that raised any suspicion to any physical or medical concerns. FF1 was in good physical condition, did regular cardiovascular and strength training workouts, and he was an avid hunter. To understand the brevity of the events in the early stages of this incident, a basic timeline follows. The timeline is derived from 4 sources: the dispatch log of the incident, FF1’s self-contained breathing apparatus (SCBA) data log, helmet camera footage from FF1, and eyewitness interviews. There is an approximate 30–60 second margin of error in times associated with the SCBA data log. This includes entry and exit from the structure. The SCBA internal timekeeper was off 4–5 minutes, commonly referred to as time drift. Time drift is not uncommon with SCBA’s internal timekeeping mechanisms and is usually rectified at the time of regular equipment service and software updates. Time Action 07:00 Shift start 14:56 Dispatch to structure fire 15:02 Battalion Chief (BC1) on -scene 15:03 First engine company (Engine 1 from Fire Department C) on-scene 15:06 Engine 2 marks on-scene (FF1’s engine company) 15:11 FF1 goes on air, breathing from his SCBA
Page 5 27-Year-old Firefighter has Seizure then Dies of Cardiac Arrest while Responding to Residential Fire – Kansas Report # F2024-04 15:12 FF1 makes entry into the structure 15:13 Primary search marked “all clear” 15:16 SCBA regulator disengaged. It is reasonable to conclude that he exits the structure at this time. 15:22 Multiple eyewitness accounts of FF1’s seizure activity and collapse 15:22 Care is initiated immediately following witnessed collapse of FF1 At 14:56, E2 was dispatched to a residence fire as part of a mutual aid response. BC1 arrived first and E2 would be the second engine on scene. BC1 reported smoke and flames coming from the residence. E2 marked on scene at 15:06 and was assigned to pull a 2nd hoseline for fire attack. The E2 crew pulls and sets up a line from the first due engine, Engine 1 (E1). E1 was assigned as the initial attack crew, and they already had their primary attack line inside the structure. The second hoseline was charged and the E2 crew made entry into the residence. FF1 helmet cam video shows FF1 pulling at the exterior roofline when his crew enters the structure, which allows another crew to enter the structure ahead of FF1. This provided an approximate 1-minute delay of FF1 meeting up with his crew inside the residence. Upon entering the structure, FF1 catches up with his crew quickly and assists with moving small piles of burning material with his hook to be extinguished by his crew’s hoseline. At approximately 15:14, FF1 shuts off his helmet camera. In the next 1–2 minutes, FF1 tells one of his engine crew members that he must exit the structure. The firefighter crew member asks FF1 if he’s ok and FF1 responds with a “yes”. FF1 exits the structure at approximately 15:16. During this same period an Incident Safety Officer reports to the IC that a small amount of fire needed some attention under the front porch. The IC tasked E2 crew with this assignment. Interviews with witnesses believe that FF1, being already outside the structure, heard the redirected assignment for E2 and made his way to this part of the porch in front of the structure. Firefighters at different locations on the fireground reported something did not appear right as FF1 came down the 3–4 steps off the wooden porch and made his way to the area underneath the porch that had some fire. These firefighters could not specify what about FF1 caught their attention as he exited the structure, only that he did. FF1 then began to do some work with his hook at a spot fire under the porch. At 15:22, FF1 was witnessed to have collapsed from standing position and then had seizure activity at which time a medical emergency was called. Nearby crew members responded to FF1 and by the time they arrived at his position, the seizure activity had stopped, and he was noted to be in cardiac arrest. On-scene FF/EMTs responders were basic life support (BLS) certified so they removed his gear and started chest compressions immediately while the Firefighter Paramedic (FFP) working the interior was directed to FF1. At this time a call was placed for an ALS transport unit. Resuscitation followed standard BLS protocol with placement of an I-Gel Airway®. A Lucas® device was placed by the FFP to assist with compressions at 15:43. Although FF1 displayed asystole for the majority of the resuscitation during which multiple doses of epinephrine were administered, the Lifepak-15 did advise and delivered one shock of 360J at 15:31 as per pre-hospital records (this differed from the timestamp on the data output of the device which noted this time to be 15:27). Medical command advised administration of 2 doses of sodium bicarbonate (this offsets metabolic acidosis that occurs with prolonged cardiac arrest). At 15:50, the cyanide antidote, hydroxocobalamin, was administered followed by one dose of calcium chloride. At 16:01, return of spontaneous
Page 6 27-Year-old Firefighter has Seizure then Dies of Cardiac Arrest while Responding to Residential Fire – Kansas Report # F2024-04 circulation was noted but this was transient. Additional doses of epinephrine were administered prior to arrival at ED at 16:08. The Lucas® device was removed at 16:10 for a pulse check which did not find one, and asystole was confirmed on the cardiac monitor. Compressions were resumed and additional doses of epinephrine, calcium chloride, and sodium bicarbonate were administered. FF1 showed ventricular fibrillation at 16:15 and a shock of 300J was provided but this degraded back to asystole by the time compressions were stopped for the next pulse check at 16:19. Additional medications were given but he remained in asystole. Time of death was noted as 16:25. Medical Findings On one of his pre-placement medical history forms completed in 2019, FF1 stated he had already been in the fire service for 2 years. As this was a hearing history form, there were questions focused on medical conditions involving hearing/vestibular issues which were all negative but none of the provided forms showed a question that asked for any/all past medical history. The Fire Marshal covering FD-A confirmed that FF1 did not have a primary care provider. This was also noted in the May 2024 ED visit records. ED records from August 1, 2024, admission note a past medical history of chickenpox, hay fever, and allergic rhinitis with no known allergies. The autopsy was conducted on August 2, 2024, the day after FF1 died, by the Chief Medical Examiner (CME) of the district in which the fatality occurred. The cause of death was determined to be “unspecified cardiac arrest while fighting a fire”. The manner of death was listed as accident. The CME noted evidence of the medical interventions engaged as part of the resuscitation efforts as well as contusions and a tongue hematoma likely related to his seizure. FF1’s height was 70 inches and weight was 185 lbs. There were no structural or vascular abnormalities in the brain. The heart weight was within normal parameters at 440 grams. There were no structural abnormalities of the heart, and the coronary arteries only showed mild atherosclerosis. No evidence of ischemia or infarction were noted. Histological examination of sections from the brain, heart, liver, and kidneys were all normal. Two slides of lung tissue showed congestion, pulmonary edema, and interalveolar (inside the small end airways where gas exchange occurs) hemorrhage. Intracardiac blood was collected and tested negative for ethanol, carbon monoxide, acetone, and a panel of 17 common drugs of abuse including prescription medications and illicit substances. During the Fire Marshal’s inventory of FF1’s personal effects, he found a receipt from a local supermarket dated August 1, 2024, and time stamped at 14:38, approximately fifteen minutes before FF1 responded to the residential fire at 14:56. FF1 purchased several caffeinated drinks and snack foods. These purchases caused the Fire Marshal to be concerned regarding FF1’s use of caffeinated products. These concerns were relayed to the medical examiner who decided to collect a femoral blood sample to test for a caffeine level. This sample resulted a caffeine level of 4.6 micrograms per milliliter (µg/ml). As per the laboratory that conducted the analysis, caffeine levels in the range 3–15 µg/ml are reflective of “usual stimulant levels” in adults [NMS 2022]. Discussion Operations/Tactics This incident exhibits many of the best elements of automatic agreements. The closest apparatus and personnel respond to an emergency incident regardless of the “patch” on the sleeve and the “shield” on
Page 7 27-Year-old Firefighter has Seizure then Dies of Cardiac Arrest while Responding to Residential Fire – Kansas Report # F2024-04 the apparatus door. Within the first few minutes, the IC from FD-B worked with companies from multiple agencies to get an aggressive fire attack in motion, and the primary search was cleared within 10 minutes of the first engine’s arrival. NIOSH investigators found the initial operations to be adequate. The IC and his assignments effectively mitigated the fire. However, good practice and NFPA consensus standards dictates that no firefighter should be entering or leaving the fire structure alone [NFPA 2024]. FF1’s helmet camera footage showed he entered the structure following firefighters that were not part of the E2 crew, and quickly caught up with the E2 crew. FF1 spent approximately 4 minutes inside and probably was never more than about 10 feet inside the front door before notifying a member of his crew he was going to exit the structure. His E2 officer was unaware that FF1was exiting the structure until after incident command reassigned the crew to the side A porch for a small fire under the porch. FF1 was not with his crew when he disengaged his SCBA at 15:16 through his collapse at 15:22. If his collapse had not been seen by other nearby responders who began to render aid, there could have been a significant delay in others being aware he was experiencing a medical emergency and initiating medical care. Even when all tactics are accomplishing the objectives of an incident action plan (IAP), it is important to ensure that basic safety tenets are followed. On scene EMS and related transport service are issues that must be addressed in all emergency response plans. In this incident an operational ALS engine company was part of the initial response increasing FF1’s chances of survival. As per NFPA 1550, Standard for Emergency Responder Health and Safety states in Paragraphs 10.6.9 – 10.6.11 and A.10.6.9 that basic life support or advanced life support (preferred) with transportation capabilities should be available on scene when members are operating at a structure fire or performing special operations, and for medical monitoring at HAZMAT incidents, and considered based on risk management at other emergency operations [NFPA 2024]. If resources are challenged, efforts should be made to assign EMS transporting units once an incident is confirmed to be a working incident by first arriving crews so that any responding personnel who experience a medical emergency can be immediately transported to a higher level of care. NIOSH investigators identified delays in obtaining EMS transport as this resource was not assigned as part of the original working incident and it was just by happenstance that an ALS level provider was on-scene as part of the responding staff to provide care until an appropriate transport unit arrived. In these jurisdictions, agencies place paramedics and ALS equipment on apparatus but those apparatus are not part of formal EMS response. In this incident, E1 was ALS staffed and equipped giving FF1 the best chance of survival. Many similar responses could occur in other parts of these jurisdictions and there would be no ALS staffed and equipped apparatus. Knowing where those apparatus are and their availability for response would be helpful when transporting units are unavailable. Fire departments should consider creating a notation on their dispatch records to denote whether staff assigned to apparatus have ALS provider capacity with the associated equipment. Medical FF1’s cause of death was “unspecified cardiac arrest sustained while fighting a fire”. FF1 did not have any known prior medical history. NIOSH investigators cannot make any determinations beyond what the medical examiner stated as to what caused the seizure and cardiac arrest that occurred to FF1 on August 1, 2024. However, there are some aspects to FF1’s fatality that may be helpful to discuss.
Page 8 27-Year-old Firefighter has Seizure then Dies of Cardiac Arrest while Responding to Residential Fire – Kansas Report # F2024-04 Syncope The Fire Marshal noted that FF1’s neighbors had witnessed him have a syncopal episode sometime around April-May 2024, but he was unable to confirm ED evaluation. Records obtained by NIOSH investigators from an ED near FF1’s home showed that he was seen in that ED on May 16, 2024. FD-A’s records show that FF1 had worked May 15, 2024, 07:00 to May 16, 2024, 07:00 and during that shift, he responded to 3 calls with the last call dispatching him from the station at 17:00 for an “unauthorized burning”. ED records show that FF1 stated that he started mowing his lawn around 18:00 on May 16, 2024, and had completed 3 passes with his push mower when he suddenly lost consciousness and woke up on the ground. Neighbors witnessed the collapse and reported that he had aroused by the time they reached him. FF1 stated he felt his speech was initially slurred when he came to on the ground. The neighbors contacted FF1’s family and he was transported to the ED in their private vehicle. FF1 reported that he “did not drink very much, had not really had much to eat today” and felt that he “woke up after a minute”. His job as a firefighter was noted on the chart along with a denial of any past medical history. He denied any recent illness, fever, chills, headache, chest pain or pressure, or abdominal pain. Vital signs on 18:58 arrival to ED were oral temperature of 98.5℉, heart rate 98 beats per minute (bpm), respiratory rate 18 breaths per minute, blood pressure 142/79 millimeters of mercury (mmHg) and oxygen saturation 96% on room air. His physical examination was unremarkable, and no trauma related to his fall from standing height was noted. Head CT was negative. Orthostatic syncope (also called postural hypotension) is tested by obtaining blood pressures when the patient is supine (lying flat on their back) and then immediately after being asked to stand. A positive test for orthostatic syncope is defined as a drop in systolic blood pressure by at least 20 mmHg and a drop in diastolic blood pressure of at least 10 mmHg within 3 minutes of standing. In FF1’s case, his orthostatic blood pressures did not meet both of these conditions going from 142/79 mmHg while supine to 127/74 mmHg while standing but he reported feeling “shaky” on standing. An electrocardiogram (EKG) showed a normal sinus rhythm of 93 bpm with no ST segment depression/elevation indicative of cardiac ischemia/infarction. It is important to note that the aforementioned maneuver and blood pressure testing to check for orthostatic syncope has a sensitivity for hypovolemia/dehydration of only 70% [Probst 2022]. Blood tests ordered by the ED physician included a complete blood count which did not show evidence of anemia and a marker for cardiac injury was negative. Chemistry panels showed a normal blood glucose level, liver function, and a ratio of blood urea nitrogen (BUN) to creatinine of 6. Dehydration may be evidenced by a BUN: creatinine ratio > 20. ED notes state that FF1 felt better after 2 liters of intravenous fluids. Repeat vital signs prior to discharge: blood pressure 134/83 mmHg, heart rate 88 bpm, respiratory rate 12 breaths/min and oxygen saturation 97% on room air. Hypovolemia / dehydration is often accompanied by a heart rate > 100 bpm and/or low blood pressure which normalizes once the fluid/volume deficit is corrected but FF1 did not have those on arrival to the ED and his vital signs did not change significantly after receiving IV fluids. Although FF1 stated he felt better after receiving IV fluids, which would be subjective evidence of dehydration/hypovolemia, his chemistry panel did not reflect this, he did not meet criteria for orthostatic syncope, and there were no significant changes in his vital signs between ED arrival and after receiving the IV fluids as would be expected after correcting a volume deficit. Therefore, his
Page 9 27-Year-old Firefighter has Seizure then Dies of Cardiac Arrest while Responding to Residential Fire – Kansas Report # F2024-04 discharge diagnosis of “vasovagal syncope or dehydration” included instructions to stay hydrated, and “pursue further outpatient evaluation with the primary care physician or the other designated or consulting physician as outlined in the discharge instructions”. Vasovagal syncope (VVS) is purely a clinical diagnosis (i.e., there is no diagnostic test for it). VVS is considered a type of reflex or neurally mediated syncope and it is a separate clinical entity from orthostatic syncope. In VVS, the patient usually experiences symptoms immediately preceding the LOC such as nausea, lightheadedness, sweating, warmth, or chills, and blurred or darkening vision. Triggers for vasovagal syncope may include fear/anxiety, prolonged standing, viewing a traumatic scene, etc. [Probst 2022]. However, it was noted FF1 did not have a primary care physician and there were no specialist referrals on the discharge form. FD-A confirmed that FF1 did not have a primary care provider at the time of his death. A first syncopal episode should have further evaluation to determine the cause especially when the initial evaluation does not clearly identify the cause as in this case [Probst 2022; Shen et al. 2017]. Syncope refers to a transient loss of consciousness (LOC) caused by inadequate blood flow to the brain. The LOC associated with a syncopal episode is characterized by “rapid onset, short duration, and spontaneous complete recovery”. Syncope can be a presenting symptom of many conditions ranging from life-threatening to benign. Therefore, it is important for someone experiencing a first syncopal episode to have a thorough medical evaluation. An initial evaluation of a syncopal episode often occurs in an ED that conducts an initial assessment for immediate life-threatening conditions including but not limited to acute myocardial infarction, aortic dissection, arrythmia (ventricular tachycardia/fibrillation, high degree atrioventricular blocks, etc.), hypertrophic cardiomyopathy, pulmonary embolism, intracranial bleed, etc. Other causes of syncope are related to vascular tone such as vasovagal/neurocardiogenic disorder, orthostatic hypotension (body cannot maintain perfusion to brain when going from supine to standing position), disorders of the carotid sinus which contain baroreceptors to monitor mean arterial blood pressure (MAP) and can send signals to the heart and brain to adjust vessel tone, heart rate, cardiac stroke volume, etc. to compensate for drops in the MAP. Syncope can even be caused by “bearing down” when coughing or during defecation. Once immediate life-threatening causes are ruled out, the patient can then be provided outpatient referrals to various specialists (i.e., cardiology, neurology, etc.) to determine the cause of the syncopal episode which will then guide treatment options. Other conditions may mimic syncope such as transient low blood sugar, hypoxia due to symptomatic anemia, and certain types of seizures [Furlan et al. 2024; Grossman and Badireddy 2023; Martone et al. 2024]. As per FD-A’s Leave Policy dated August 2019, “An employee who is unable to report for duty due to illness or injury shall notify their regularly assigned supervisor or a supervisor where the employee is assigned for the affected duty shift…..It is the employee’s responsibility to keep their supervisor informed of progress of the illness or injury on a monthly basis and an estimated return to duty date. When 48 or more consecutive hours of sick leave are used, the employee must provide a Commissioned Fire Personnel Return to Work Form, prior to or upon returning to work. This form must be signed by a health care provider and include information indicating the employee is able to perform assigned duties”. In a later section of that same document under the “Return to Work” section, it states that “a doctor’s release is required when returning to duty”. FD-A records show FF1 returned to work for his next scheduled shift on May 18, 2024, 0700 to May 19, 2024, 0700. Since his syncopal episode and subsequent ED evaluation occurred during non-duty hours and he was able to resume
Page 10 27-Year-old Firefighter has Seizure then Dies of Cardiac Arrest while Responding to Residential Fire – Kansas Report # F2024-04 work as scheduled, he was not required by FD-A policy to inform his supervisor or undergo a Return To Work evaluation. FD-A does not require annual medical evaluations of its members as per recommendations in NFPA Standard 1582. In this case, lack of an annual NFPA medical examination may represent a missed opportunity for FF1 to report the syncopal episode to a physician who could have coordinated specialist evaluations to determine if he had an underlying medical condition that could have impacted his ability to perform his job especially since FF1 did not have his own primary care physician to fulfill this role. Recurrent syncope is listed as a cardiovascular condition that could impact the safe performance of essential firefighter job tasks in Section 9.7 of this standard. In Section 7.5 of the standard, it states that the annual medical examination should include a medical history questionnaire to “provide baseline information with which to compare future medical concerns” and this questionnaire should include “changes in health status and known occupational exposures since the previous annual evaluation” so this may have been a way for the syncopal event to have been captured in his FD medical record and sent for further evaluation [NFPA 2022]. Sudden Cardiac Death Sudden cardiac death (SCD) has been a recognized entity in the U.S. Fire Service for over a decade. Although cardiovascular disease (CVD) events of all types, including heart attack, are the leading cause of non-traumatic death in firefighters, SCD is thought to be mainly due to arrhythmias which usually occur in the setting of pre-existing cardiac conditions involving structural abnormalities such as an enlarged heart (cardiomegaly), atherosclerotic cardiovascular disease (ASCVD), thickening of the heart muscle (hypertrophy), etc. [Smith et al. 2013]. Many schools have instituted pre-participation screening of potential athletes for undiagnosed hypertrophic cardiomyopathies (HCMs), thickening of the portion of the heart muscle that separates the ventricles that can bulge out resulting in blood flow obstruction during physical activity and/or place an individual at higher risk for potentially fatal arrythmias leading to SCD. HCMs are the most common cause of SCD among pediatric/ young adult athletes accounting for about 36% of cases [Horeczko 2022]. Endurance and strength training in athletes can induce remodeling of the heart’s structure and conduction system making an evaluation by a cardiologist a prudent action prior to approving participation in sports. The American Heart Association (AHA) has developed a standardized screening tool for this purpose [Lammlein et al. 2018]. HCM was noted as the most common cause of death in US athletes overall under 35 years of age while atherosclerotic coronary artery disease is the most common cause of SCD in athletes over 35 years of age [Maron et al. 2007]. FF1’s coronary arteries were clear and there were no structural abnormalities found in the heart. The weight of the heart at 400 grams was within the normal range for adult males [Sens and Hughes 2021]. While HCM, heart valve defects, etc. are associated with anatomical abnormalities, arrythmias may result in SCD without leaving macroscopic or histological evidence to be found at autopsy. Some arrythmias are intermittent and would only be found during prolonged Holter monitoring if not captured on a snapshot EKG [Bragg et al. 2024]. There are a class of cardiac arrythmias involving defects in the protein that forms calcium channels because of genetic mutations. Calcium, sodium, and potassium ion channels in the myocardial cell membranes are the base components of the cardiac conduction system. Molecular pumps use these channels to create the voltage gradients that form the electrical signals sent to the various structures of the heart resulting in coordinated contraction for
Page 11 27-Year-old Firefighter has Seizure then Dies of Cardiac Arrest while Responding to Residential Fire – Kansas Report # F2024-04 efficient pumping. Calcium channel defects include Brugada Syndrome as well as Long and Short QT Syndromes and of these, Long QT Syndrome (LTQS) is the most common. Studies have identified ten different genetic mutations causing the defect in the protein that forms the calcium ion channel in LQTS [Grant 2009; Jouriles 2022]. FF1 had an exercise stress test via treadmill done as part of his preplacement medical evaluation in 2019 and an EKG done during his ED visit for syncope in 2024 and neither noted abnormalities consistent with these or other types of cardiac conduction disorders. One of the challenges in deaths due to SCD, is that there is often no evidence of the cause to be found during autopsy as in this case. This was reflected in a large study using autopsy data from the U.S. Department of Defense’s Cardiovascular Death Registry which analyzed 902 nontraumatic sudden deaths of individuals over 18 years of age. Although 79% of these deaths were determined to be due to cardiac causes, no cause could be identified in 21% of these cases [Eckart et al. 2011]. There have been reports of possible increased risk of SCD following COVID-19 infection; particularly in those who develop long COVID-19 [Karimi et al. 2024; Stimart and Hipkins 2024]. However, since FF1 did not have any documented testing confirming COVID-19 infection following his suspected exposure in November 2019, no further association can be made. Concerns were also raised if COVID-19 vaccination could have played a role in this fatality. There was no documentation provided that FF1 received a COVID-19 vaccination. However, there is no evidence that COVID-19 vaccinations have resulted in sudden cardiac death [Liko and Cieslak 2024]. Review of data provided through the Vaccine Adverse Event Reporting System (VAERS) did show an association between COVID-19 vaccination and occurrence of myocarditis, an inflammation of the heart muscle, and/or pericarditis, an inflammation of the fluid filled sac around the heart, in children and young adults. These conditions are usually accompanied by severe symptoms of chest pain, heart palpitations, and/or shortness of breath and elevations of blood markers for inflammation (increased white blood cell count, erythrocyte sedimentation rate, etc.) and myocardial damage (troponin I, etc.) [CDC 2023]. A large, retrospective study of data from 4 health plans covering over 100 million U.S. adults found that myocarditis and/or pericarditis following mRNA COVID-19 vaccination was rare with only 411 documented cases among 15 million people receiving approximately 27 million doses of vaccine [Wong et al. 2022]. There were no reports of FF1 having symptoms consistent with myocarditis or pericarditis. His EKG and the blood test during his May 16, 2024, ER visit did not show any evidence of myocardial damage. Heat Stroke/Rhabdomyolysis Historical weather data showed that on the date and approximate time of his syncopal episode, the outdoor temperature was 75°F with 60% humidity resulting in a heat index of 75°F. On August 1, 2024, at 1500, the approximate time of arrival at the residential fire, the outdoor temperature was 96°F with 44% humidity resulting in a heat index of 103.4°F. It was noted that the cab of the apparatus FF1 was driving during his August 1, 2024, shift was not air conditioned and that crewmembers had reported FF1 stating that he felt hot inside the cab. Exertional heat stroke can occur even in seemingly “cool” environments such as a 25-year-old firefighter who died of this after 30 minutes of engaging in an indoor maze course whose thermostat was set to 66°F while in full turnout gear and SCBA [NIOSH 2018]. It is vital for fire departments not to underestimate the contribution of exertional heat to the net heat load especially while engaged in firefighter essential tasks in a hot environment as in this case.
Page 12 27-Year-old Firefighter has Seizure then Dies of Cardiac Arrest while Responding to Residential Fire – Kansas Report # F2024-04 Rhabdomyolysis is the constellation of signs and symptoms that result when muscle tissue is damaged. This damage can be caused by a variety of insults such as direct mechanical disruption, overheating the muscle, overexertion, direct toxicity from medications, decreased blood flow to muscles due to medical conditions such as sickle cell disease or use of vasoconstrictive substances such as caffeine, etc. [CDC 2024; Cervellin et al. 2017]. Both heat stroke and rhabdomyolysis may result in seizures and death but since there is no documentation of any temperature taken in the ED and no creatine kinase (CK) levels, the blood marker for rhabdomyolysis, it is not possible to determine if either condition played a part in this death. NIOSH has created information sheets for structural firefighters regarding their risk for rhabdomyolysis: What Structural Fire Fighters Need to Know about Rhabdomyolysis along with a wallet card that structural firefighters can show to healthcare providers when they present for treatment of possible signs and symptoms of rhabdomyolysis. There is a companion document for healthcare providers of structural firefighters reminding them of their increased risk for rhabdomyolysis as a result of their job titled, “Rhabdomyolysis in Structural Fire Fighters: A Patient Population at Risk”. General guidance regarding heat stress evaluation and mitigation along with information on identification of heat-related illness (HRI) including heat-related rhabdomyolysis, is provided in the most recent edition of the NIOSH heat stress criteria document [NIOSH 2016]. Structural firefighters may be exposed to multiple different sources of heat contributing to their overall heat load. Aside from ambient environmental conditions that can be exacerbated due to relative humidity reflected by the local heat index, other heat sources may include heat generated by the fire they are fighting, and metabolic heat generated by their muscles due to the exertion involved in performing their essential job tasks. The turnout gear worn as part of their PPE, can worsen firefighter heat exposure due to increased exertion induced by the extra weight that the firefighter must carry resulting in the generation of more metabolic heat. In addition, the heavy materials used in turnout gear can trap heat by blocking the body’s usual methods of dissipating heat through evaporative heat loss from sweating and direct heat transfer from the body to the environment from dilated blood vessels underneath the skin. NIOSH has conducted Health Hazard Evaluations regarding heat exposure and rhabdomyolysis in structural firefighters during training [NIOSH 2015, 2019]. It was also noted that the bay in FD-A in which the exercise equipment is located was not air conditioned. Fitness centers should be located in areas where HVAC systems can offset the heat and/or humidity (from sweat and exhalation) generated by those utilizing the workout area in order to reduce the possible adverse health effects of heat exposure during physical fitness training. Studies have also shown that the indoor air conditions of fitness centers have impacts on the effectiveness of both aerobic and anaerobic training [Huang et al. 2021]. The American College of Sports Medicine recommends an air temperature 65°F–68°F (18.3℃–20℃) and a relative humidity of 40%–60% for areas in which aerobic exercise, strength training, or Pilates workouts are occurring [ACSM 2012]. Caffeine Toxicity Caffeine is a stimulant that impacts the cardiovascular system by increasing heart rate directly and increasing blood pressure through its vasoconstrictive properties, both of which place additional strain on the heart which can increase risk for an acute cardiac event especially in the setting of increased physical exertion. Vasoconstriction also results in decreased blood flow to the supplied tissues thereby
Page 13 27-Year-old Firefighter has Seizure then Dies of Cardiac Arrest while Responding to Residential Fire – Kansas Report # F2024-04 increasing the risk for rhabdomyolysis. The products noted by the Fire Marshal on the receipt found in FF1’s personal effects included Mio water enhancer, Celsius® Energy Drink, and Liquid I.V. The Mio product line is made by Kraft Heinz food company and comes in 3 different types: Original, Hydrate, and Energy. The original and hydrate lines are caffeine free while Mio Energy contains 90 mg caffeine per serving and each 1.62 fluid ounce (fl oz) bottle of Mio Energy contains 12 servings for a total caffeine content of 1.08 grams per bottle. Celsius® Energy Drink is produced by a company of the same name, and it comes in 3 different lines: Celsius® original (12 oz cans), Celsius® Essentials (16 oz cans), and Celsius® On-the-Go (0.17–0.20 oz powder packets). These products contain between 200–300 milligrams (mg) caffeine per can/packet. The Liquid IV line has 5 products: Hydration Multiplier®, Hydration Multiplier® sugar-free, Immune Support, Gut Health, and Energy Multiplier. Both versions of the Hydration Multiplier® along with the Immune Support, and Gut Health products do not contain any caffeine. The Energy Multiplier contains 100 mg caffeine per serving. The Fire Marshal’s notes did not specify which specific product of each of these product lines were purchased. Caffeine is a widely used stimulant and it is estimated that 85% of the US population drinks at least one caffeinated beverage per day. Moderate caffeine intake of less than 400 mg/day is considered safe. Caffeine content of common items is 30–60 mg per 12 oz. of soda, 50 mg in 8 oz of black tea, and 80 mg per 8 oz coffee. Caffeine is quickly absorbed through the gastrointestinal tract and crosses the blood-brain barrier to directly affect the central nervous system to cause increased alertness and decreased fatigue. It impacts the autonomic nervous system by increasing heart rate, respiratory rate, and blood pressure. Blood pressure is increased via constriction of the smooth muscle in the walls of blood vessels. Excessive intake can lead to caffeine toxicity resulting in heart attack, cardiac arrest, tachycardia, hypertension, and rhabdomyolysis along with seizures, hallucination, anxiety, nausea/vomiting and abdominal pain. Case reports of deaths due to caffeine toxicity have reported postmortem blood caffeine levels 160–400 µg/ml [Banerjee et al. 2014; Brower and Swatek 2024]. NMS labs who conducted the postmortem caffeine test on FF1 reported that levels > 50 µg/ml are considered toxic. Therefore, FF1’s postmortem caffeine level of 4.6 µg/ml would not be considered high enough to have played a significant role in his death. However, first responders should monitor their caffeine intake due to its potential to exacerbate cardiac demands in a job that is already strenuous. In addition, due to its vasoconstrictive properties, caffeine is a known risk factor for rhabdomyolysis and increases the risk for HRI by opposing the body’s dilation of the small blood vessels under the skin for heat dissipation. It is good practice for firefighters to reduce exposures to known risk factors for rhabdomyolysis and HRI due to the risks for the conditions inherent in their job. Cyanide Toxicity Cyanide is a known product of combustion for many items found in a residential location. Inhalation of cyanide byproducts in fire and smoke inhalation victims can be a cause of cardiac arrest. Therefore, the actions of the EMS crew in administering the cyanide antidote, hydroxocobalamin, were reasonable. Cyanokit®, the brand name that hydroxocobalamin is marketed under and how it is referred to in the FD-B protocol, was approved by the U.S. Food and Drug Administration in 2006. The manufacturer states that its use is indicated for “known or suspected cyanide poisoning. If clinical suspicion of cyanide poisoning is high, Cyanokit® should be administered without delay” [Serb Pharmaceuticals
Page 14 27-Year-old Firefighter has Seizure then Dies of Cardiac Arrest while Responding to Residential Fire – Kansas Report # F2024-04 2024]. One of the challenges of cyanide toxicity is that blood tests for cyanide often take hours to result. Since cyanide acts by disrupting cellular processes, hypoxia and metabolic acidosis quickly evolve and the latter can be detected by rapid tests for lactate and an anion gap [Huzar et al. 2013]. However, disruption of cellular functions that occur during a cardiac arrest can themselves result in elevated lactate levels and metabolic acidosis, so these conditions are not specific to cyanide toxicity. Although FF1’s postmortem blood sample was not tested for cyanide, it was tested for carbon monoxide, another combustion byproduct that would lend evidence to smoke inhalation, and that was not detected. One study measured combustion byproduct gases in fire smoke including carbon monoxide, hydrogen cyanide, hydrogen sulfide, ammonia, nitrogen dioxide, and sulfur dioxide over a period of 16 months within the Chicago Fire Department found that of all the 6 gases measured, carbon monoxide had the highest maximum exposure and the highest total concentration [Fabian et al. 2014]. Carbon monoxide and cyanide levels in the blood of smoke inhalation victims have also been shown to correlate [Baud et al. 1991]. FF1 was wearing his SCBA when he entered the residence and had disengaged it when he exited the structure. Since he was not breathing supplied air at the time of his collapse, cardiac arrest from cyanide exposure from smoke inhalation was possible. However, it would be unlikely to have a fatality due to smoke inhalation injury without evidence of any exposure to carbon monoxide. Regardless, due to the fast progression of cyanide toxicity and its lethality, presumptively treating a cardiac arrest at a fire scene with the cyanide antidote is appropriate and in line with current FD-B protocol but due to the lack of evidence of CO exposure, it is unlikely that cyanide toxicity played a role in this fatality. Contributing Factors Occupational injuries and fatalities are often the result of one or more contributing factors or key events in a larger sequence of events that ultimately result in the injury or fatality. Since the cause of death could not be definitively determined in this case, there is no evidence that the following recommendations would have prevented this fatality, but they are being provided here as a reminder of good practice. Recommendations Recommendation #1: Fire departments should consider implementing annual medical examinations as per NFPA 1582 recommendations. Discussion: In this case and many others, firefighters may not have their own primary care physician and the provider of the annual NFPA medical evaluation may be the only physician they see regularly. Section 9.1.2 of this standard states that “The occupational medical evaluation shall include a medical history, examination, and any medical tests required to assess medical conditions that can affect an individual's ability to safely and effectively perform the essential job tasks.” In this case, if an annual medical examination had been conducted between May 16, 2024, and August 1, 2024, it is unknown if FF1 would have disclosed his syncopal event and if so, if a further evaluation of it coordinated by the physician conducting the exam would have prevented his death but it does represent a potential missed opportunity.
Page 15 27-Year-old Firefighter has Seizure then Dies of Cardiac Arrest while Responding to Residential Fire – Kansas Report # F2024-04 Recommendation #2: Fire departments should encourage members to reduce and if possible, eliminate intake of/exposure to known risk factors for adverse cardiovascular events and rhabdomyolysis. Discussion: Firefighters have multiple risk factors for adverse cardiac events and rhabdomyolysis due to various inherent aspects of the essential job tasks including intense, physical exertion while in a hot environment. It would be prudent to avoid or at least reduce intake/exposure to additional known risk factors for both cardiac events and rhabdomyolysis such as caffeine use, poor nutrition leading to formation of cholesterol plaques inside blood vessels decreasing blood flow, etc. Fire departments should also encourage seasonal influenza and COVID-19 vaccinations as both these infections have been associated with increased risk for rhabdomyolysis [Singh and Scheld 1996; Singh et al. 2020]. Ensuring that fitness centers inside fire stations and apparatus cabs are air conditioned, will help reduce risk of HRI, heat-related rhabdomyolysis, and adverse cardiac events while encouraging improved physical fitness. Recommendation #3: Fire departments should increase awareness of conditions that increase risk of heat-related illness (HRI) and implement heat stress management policies to reduce those risks. Discussion: Heat stress is the net exposure experienced which can be from multiple sources such as ambient environmental conditions, active heat source such as a fire, and heat generated by muscles through physical exertion. Heat exposure in structural firefighters can be exacerbated by wearing turnout gear that can trap heat due to disruption of the body’s usual routes of heat dispersion of evaporative heat loss from sweating or direct conductive heat transfer to the environment. Heat strain is the body’s response to heat stress and consists of a spectrum of clinical conditions from heat cramps to the most severe and potentially life-threatening heat stroke. Although many heat sources are unavoidable for structural firefighters, efforts should be made to mitigate those that can be reduced. In this case, on the day FF1 died, the outdoor temperature was 96°F with 44% humidity resulting in a heat index of 103.4°F. The cab of the apparatus FF1 was driving that shift was not air conditioned and crewmembers had reported FF1 stating that he felt hot inside the cab. Fire departments should consider purchasing apparatus with air-conditioned cabs to reduce the heat stress firefighters inside that cab experience due to environmental conditions but also to act as a cooling location if a firefighter should develop heat-related illness on scene before an EMS unit is present. Similarly, fitness centers located in fire stations should also be air conditioned to reduce the risk of HRI in those using those facilities. Lastly, this fatality occurred shortly after the incident response began, otherwise with an event of extended duration, a rehab location would be protocol to provide cooling and rehydration along with a crew rotation as a heat stress mitigation approach. Recommendation #4: Ensure EMS with transport capability is on-scene at any fire or special operation location in the event emergency medical care and transport is needed. Discussion: Based on resource availability in this jurisdiction, EMS transporting units were not automatically sent to structure fires on the initial dispatch nor at the report of a working incident by initial on-scene firefighting personnel. Normal operations in this jurisdiction give EMS transport unit requesting authority to the IC. In this incident, the IC requested a transporting unit upon witnessing FF1 collapse. Given normal jurisdictional procedures, this operation appropriately requested an EMS transport unit.
Page 16 27-Year-old Firefighter has Seizure then Dies of Cardiac Arrest while Responding to Residential Fire – Kansas Report # F2024-04 Strain on EMS system resources can affect many aspects of emergency response, and that challenge has no doubt impacted agencies across the United States. It is imperative to find ways to get needed resources to an emergency incident. In this case, ALS capability was part of the first due engine company and the efforts of the firefighter paramedic, along with on-scene firefighter EMT-Basics, afforded FF1 the best opportunity for survival. In this incident, the response delay of the transporting unit did not delay advanced care. However, at fire scenes where a FFP is not on a responding apparatus, there would be a delay in initiation of ALS care and transport if an ALS EMS unit is not dispatched as soon as a working fire is identified. The NFPA 1550, Standard for Emergency Responder Health and Safety states in Paragraphs 10.6.9 – 10.6.11 and A.10.6.9 that basic life support or advanced life support (preferred) with transportation capabilities should be available on scene when members are operating at a structure fire or performing special operations, and for medical monitoring at HAZMAT incidents, and considered based on risk management at other emergency operations. [NFPA 2024]. Recommendation #5: Fire officers should ensure crew integrity when entering, operating in, and exiting from an environment immediately dangerous to life or health (IDLH). Discussion: In this incident, the crew was assigned to pull a 2nd 1-3/4-inch hoseline for interior attack. Crew members reported that they went in together. Once inside, it was reported that the crew was split into two teams, with FF1 and the nozzleman in the living room to hit spot fires. Helmet cam video from FF1 provides a few minutes of conditions and actions beginning outside readying to enter the residence and continues inside the residence until the helmet cam is turned off. The video shows: The fire officer entered and was followed by the nozzleman and back up. However, before FF1 enters, several firefighters from other companies were in line at the side A door working their way in. These firefighters pushed the hoseline while FF1 pulled at hot spots along the roofline. FF1 then entered and made his way into the residence before meeting up with his crew. The crew worked on dousing a debris fire from roofing materials collapsed into the residence. In the video, the crew goes out of view as FF1 remains in the same area of the residence with other firefighters passing by. The crew appears again in the video before the video is turned off. The video does not continue to when FF1 tells one of the crew that he’s leaving the structure. FF1 reportedly exits on his own. The fire officer was unaware . that FF1 was exiting the structure until after IC reassigned the crew to the side A porch for a small fire under the porch. NFPA 1550, Standard for Emergency Responder Health and Safety states in Paragraph 10.5.6 that company officers shall maintain an ongoing awareness of the location and condition of all company members. Paragraph 10.5.7 states that, where assigned as a company, members shall be responsible to remain under the supervision of their assigned company officer [NFPA 2024]. The International Association of Fire Chiefs’ Safety, Health, and Survival Section has redefined the Rules of Engagement for Structural Fire Fighting. One of the objectives is to ensure that firefighters always enter a burning building as a team of two or more members and no firefighter is allowed to be alone at any time while entering, operating in, or exiting a building. A critical element for firefighter survival is crew integrity. Crew integrity means firefighters stay together as a team of two or more. They must enter a structure together and remain together at all times while in the interior, and all members come out together.
Page 17 27-Year-old Firefighter has Seizure then Dies of Cardiac Arrest while Responding to Residential Fire – Kansas Report # F2024-04 Crew integrity starts with the company officer ensuring that all members of the company understand their riding assignment, have the proper personal protective equipment, and have the proper tools and equipment. Upon arrival at the incident, the company is given a task to perform by the incident commander. The company officer communicates to the members of the company what their assignment is and how they will accomplish their assignment. Just as the members of a company enter a hazardous environment together, they should leave together to ensure that crew integrity is maintained. If one member has to leave, the whole company leaves together [IAFC 2012]. It is the responsibility of every firefighter and company officer to stay in communication or contact with crew members at all times by visual observation, voice, or touch while operating in the hazard zone. All firefighters should maintain the unity of command by operating under the direction of the incident commander, division/group supervisor, or their company officer at all times. The ultimate responsibility for crew integrity and ensuring no members get separated or lost rests with the company officer. If crew integrity is lost, firefighters are placed at increased risk. A Mayday should be called if any member cannot be accounted for as described above. Company officers should give an accountability report upon exiting the hazard zone to either Command or their assigned division or group supervisor. Recommendation #6: Fire departments should provide physicians tasked with pre-employment and return to work medical evaluations, descriptions of the essential tasks and duties and not rely on the cadet/incumbent to relay this information. Discussion: NFPA 1582 Section 4.1.5 states “The fire department shall provide the fire department physician with a fire service overview, current job descriptions, and the essential job tasks required for all fire department positions and ranks [NFPA 2022].” On FF1’s preplacement Respirator Physical – Physician’s Recommendations form, there are 2 options under the “Job Description” section, and they are: • Yes, a specific respirator job description was provided by the Company. This recommendation is based upon this description and history/physical information gained today. • No, a respirator job description was not provided by the Company and this recommendation is based solely upon history/physical information gained today. The nurse who signed off on that form on February 19, 2019, selected the “No” option. Fire Departments should consider including in their pre-employment medical evaluation form packets a document containing a description of their essential tasks to ensure all providers involved in these evaluations have access to that information and can affirm their awareness of these tasks upon signing off on their respective components of the candidate’s medical condition. Recommendation #7: Fire departments should ensure that a physician signs off on pre-employment and return to work evaluations. Discussion: NFPA 1582 states medical evaluations should be conducted by a Fire Department Physician as per Section 7.2.1 “The fire department, the fire department physician, and member organizations where they exist shall be responsible to convey the purposes and importance of the annual occupational medical evaluation to members and to the AHJ”. Section 3.3.6 defines a Fire Department Physician as “A licensed doctor of medicine or osteopathy who has been designated by the
Page 18 27-Year-old Firefighter has Seizure then Dies of Cardiac Arrest while Responding to Residential Fire – Kansas Report # F2024-04 fire department to provide professional expertise in the areas of occupational safety and health as they relate to emergency services”. Section 4.2.2. states “When medical evaluations are conducted by a physician or medical provider other than the fire department physician, the evaluation shall be reviewed and approved by the fire department physician.” In FF1’s case, his pre-employment clearance was signed off by an advanced practice registered nurse without clear evidence of physician oversight or documentation of review by the fire department physician. References American College of Sports Medicine [2012]. ACSM’s Health/Fitness Facility Standards and Guidelines. Fifth Edition. Champaign, Illinois: Human Kinetics. Banerjee P, Ali Z, Levine B, Fowler DR [2014]. Fatal caffeine intoxication: a series of eight cases from 1999 to 2009. J Forensic Sci 59(3):865–868. Baud FJ, Barriot P, Toffis V, Riou B, Vicaut E, Lecarpentier Y, Bourdon R, Astier A, Bismuth C [1991]. Elevated blood cyanide concentrations in victims of smoke inhalation. N Engl J Med 325(25):1761– 1766. Bragg S, Brown B, DeCastro AO [2024]. Arrhythmias and Sudden Cardiac Death. Prim Care 51(1):143–154. Brower JO, Swatek JL [2024]. Beyond the buzz: the fatal consequences of caffeine overconsumption. J Anal Toxicol 48(8):535–540. Centers for Disease Control and Prevention [2023]. Clinical considerations: myocarditis after COVID-
19 vaccines | CDC. Atlanta, GA: U.S. Department of Health and Human Services, Centers for Disease Control and Prevention. Centers for Disease Control and Prevention [2024]. Rhabdomyolysis. Atlanta, GA: U.S. Department of Health and Human Services, Centers for Disease Control and Prevention. Cervellin G, Comelli I, Benatti M, Sanchis-Gomar F, Bassi A, Lippi G [2017]. Non-traumatic rhabdomyolysis: background, laboratory features, and acute clinical management. Clin Biochem 50(12):656–662. Eckart RE, Shry EA, Burke AP, McNear JA, Appel DA, Castillo-Rojas LM, Avedissian L, Pearse LA, Potter RN, Tremaine L, Gentlesk PJ, Huffer L, Reich SS, Stevenson WG [2011]. Department of Defense Cardiovascular Death Registry Group. Sudden death in young adults: an autopsy-based series of a population undergoing active surveillance. J Am Coll Cardiol 58(12):1254–1261. Fabian TZ, Borgerson JL, Gandhi PD, Baxter CS, Ross CS, Lockey JE, Dalton JM [2014]. Characterization of firefighter smoke exposure. Fire Technol 50:993–1019. Furlan L, Jacobitti Esposito G, Gianni F, Solbiati M, Mancusi C, Costantino G [2024]. Syncope in the emergency department: a practical approach. J Clin Med 13(11):3231 Grant AO [2009]. Cardiac ion channels. Circ Arrhythm Electrophysiol 2(1):185–194. Grossman SA, Badireddy M [2024]. Syncope. In: StatPearls [Internet]. Treasure Island, FL: StatPearls Publishing. Available from: https://www.ncbi.nlm.nih.gov/books/NBK442006/.
Page 19 27-Year-old Firefighter has Seizure then Dies of Cardiac Arrest while Responding to Residential Fire – Kansas Report # F2024-04 Horeczko T [2022]. Chapter 165: Pediatric Cardiac Disorders. In Rosen’s Emergency Medicine 10th Edition. Walls R, Hockberger R, Gausche-Hill M, Erickson TB, and Wilcox SR Editors. Published by Elsevier. Huang C, Que J, Liu Q, Zhang Y [2021]. On the gym air temperature supporting exercise and comfort. Build Environ 206:108313. Huzar TF, George T, Cross JM [2013]. Carbon monoxide and cyanide toxicity: etiology, pathophysiology and treatment in inhalation injury. Expert Rev Respir Med 7(2):159–170. IAFC [2012]. Rules of engagement for structural firefighting: increasing firefighter survival. Draft 10 developed by the Safety, Health and Survival Section International Association of Fire Chiefs. Jouriles NJ [2022]. Chapter 68: Pericardial and myocardial disease. In Rosen’s Emergency Medicine 10th Edition. Walls R, Hockberger R, Gausche-Hill M, Erickson TB, and Wilcox SR Editors. Published by Elsevier. Pgs. 1112–1126. Karimi M, Faal Hamedanchi N, Ansari K, Nahavandi R, Mazdak M, Javaherchian F, Koochaki P, Asadi Anar M, Shirforoush Sattari M, Mohamaditabar M [2024]. Rhabdomyolysis secondary to COVID-19 infection and vaccination: a review of literature. Front Med (Lausanne). Lammlein KP, Stoddard JM, O'Connor FG [2018]. Preparticipation screening of young athletes: identifying cardiovascular disease. Prim Care 45(1):95–107. Liko J, Cieslak PR [2024]. Assessment of risk for sudden cardiac death among adolescents and young adults after receipt of COVID-19 vaccine - Oregon, June 2021-December 2022. MMWR 73(14):317– 320. Maron BJ, Thompson PD, Ackerman MJ, Balady G, Berger S, Cohen D, Dimeff R, Douglas PS, Glover DW, Hutter AM Jr, Krauss MD, Maron MS, Mitten MJ, Roberts WO, Puffer JC [2007]. American Heart Association Council on Nutrition, Physical Activity, and Metabolism. Recommendations and considerations related to preparticipation screening for cardiovascular abnormalities in competitive athletes: 2007 update: a scientific statement from the American Heart Association Council on Nutrition, Physical Activity, and Metabolism: endorsed by the American College of Cardiology Foundation. Circulation 115(12):1643–1655. Martone AM, Parrini I, Ciciarello F, Galluzzo V, Cacciatore S, Massaro C, Giordano R, Giani T, Landi G, Gulizia MM, Colivicchi F, Gabrielli D, Oliva F, Zuccalà G [2024]. Recent advances and future directions in syncope management: a comprehensive narrative review. J Clin Med 13(3):727. NFPA [2022]. NFPA 1582. Standard on Comprehensive Occupational Medical Program for Fire Departments. Quincy, MA: National Fire Protection Association. NFPA [2024]. NFPA 1550. Standard for Emergency Responder Health and Safety. Quincy, MA: National Fire Protection Association. NIOSH [2015]. Evaluation of heat stress, heat strain, and rhabdomyolysis during structural firefighter training. By Eisenberg J, Methner M, Dowell CH, Mueller C. Cincinnati, OH: U.S. Department of Health and Human Services, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health, Health Hazard Evaluation Report 2012-0039-3242.
Page 20 27-Year-old Firefighter has Seizure then Dies of Cardiac Arrest while Responding to Residential Fire – Kansas Report # F2024-04 NIOSH [2016]. NIOSH criteria for a recommended standard: occupational exposure to heat and hot environments. By Jacklitsch B, Williams WJ, Musolin K, Coca A, Kim J-H, Turner N. Cincinnati, OH: U.S. Department of Health and Human Services, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health, DHHS (NIOSH) Publication No. 2016-106. NIOSH [2018]. Cadet dies from hyperthermia and exertional heat stroke during indoor SCBA maze training—Texas. Cincinnati, OH: U.S. Department of Health and Human Services, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health, F2016-05. NIOSH [2019]. Evaluation of rhabdomyolysis and heat stroke in structural firefighter cadets. By Eisenberg J, Li JF, Feldmann KD. Cincinnati, OH: U.S. Department of Health and Human Services, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health, Health Hazard Evaluation Report 2012-0039-3242. NMS Labs [2022]. Caffeine, Blood-0930B. Horsham, PA: NMS Labs. Probst M [2022]. Chapter 11: Syncope. In Rosen’s Emergency Medicine 10th ed. Walls R, Hockberger R, Gausche-Hill M, Erickson TB, Wilcox SR eds. Published by Elsevier.
Serb Pharaceuticals [2024]. CYANOKIT® (hydroxocobalamin) | Cyanide Poisoning Treatment. Sens MA, Hughes R [2021]. Diagnostic pathology: forensic autopsy, 1st ed. Internal Examination Cardiovascular System. Philadelphia, PA: Elsevier. Shen WK, Sheldon RS, Benditt DG, Cohen MI, Forman DE, Goldberger ZD, Grubb BP, Hamdan MH, Krahn AD, Link MS, Olshansky B, Raj SR, Sandhu RK, Sorajja D, Sun BC, Yancy CW [2017]. 2017 ACC/AHA/HRS Guideline for the Evaluation and Management of Patients With Syncope: Executive Summary: A Report of the American College of Cardiology/American Heart Association Task Force on Clinical Practice Guidelines and the Heart Rhythm Society. Circulation 136(5):e25–e59. Singh B, Kaur P, Reid RR [2020]. Case reports: rhabdomyolysis associated with COVID-19. Am Fam Physician 102(11):645–648. Singh U, Shceld WM [1996]. Infectious etiologies of rhabdomyolysis: three case reports and review. Clin Infect Dis 22(4):642–649. Smith DL, Barr DA, Kales SN [2013]. Extreme sacrifice: sudden cardiac death in the US Fire Service. Extrem Physiol Med 2(1):6. Stimart HL, Hipkins B [2024]. The negative effects of long COVID-19 on cardiovascular health and implications for the presurgical examination. J Osteopath Med. Online ahead of print. Wong HL, Hu M, Zhou CK, Lloyd PC, Amend KL, Beachler DC, Secora A, McMahill-Walraven CN, Lu Y, Wu Y, Ogilvie RP, Reich C, Djibo DA, Wan Z, Seeger JD, Akhtar S, Jiao Y, Chillarige Y, Do R, Hornberger J, Obidi J, Forshee R, Shoaibi A, Anderson SA [2022]. Risk of myocarditis and pericarditis after the COVID-19 mRNA vaccination in the USA: a cohort study in claims databases. Lancet 399(10342):2191–2199.
Page 21 27-Year-old Firefighter has Seizure then Dies of Cardiac Arrest while Responding to Residential Fire – Kansas Report # F2024-04 Investigator Information This incident was investigated jointly by the NIOSH Fire Fighter Fatality Investigation and Prevention Program (FFFIPP) Medical Team based in the Division of Field Studies and Engineering in Cincinnati, Ohio and the FFFIPP Trauma Team based in the Division of Safety Research in Morgantown, West Virginia. This investigation was conducted and this report was co-authored by Judith Eisenberg MD, MS, and Mr. Rob Saunders of the FFFIPP Medical Team and Tammy Schaeffer of the FFFIPP Trauma Team. Dr. Eisenberg is a board certified Emergency Medicine physician and Rob Saunders is a former NIOSH Technical Information Specialist. Mr. Saunders retired after 31 years with the Pike Township Fire Department, Indianapolis, Indiana. In addition to having served as a firefighter, paramedic, heavy rescue technician, and rescue diver, he has held the positions of company officer, Division Chief of Emergency Medical Services, Deputy Chief of Operations, and Fire Chief. Tammy Schaeffer is a Safety & Occupational Health Specialist. In addition, Mrs. Schaeffer served as a Pennsylvania Paramedic for 20 years and as a U.S. Army Combat Medic for 8 years, with deployment for Operation Iraqi Freedom in 2004 Disclaimer Mention of any company or product does not constitute endorsement by the National Institute for Occupational Safety and Health (NIOSH). In addition, citations to Web sites external to NIOSH do not constitute NIOSH endorsement of the sponsoring organizations or their programs or products. Furthermore, NIOSH is not responsible for the content of these Web sites.
FD06032 | 2024_美国_NIOSH_face202405.pdf
分类:06_境外及港澳台调查报告 | 年份:2024 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
Page i
Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Executive Summary On September 4, 2024, a 35-year-old career battalion chief (Battalion 1) died while operating at a tractor trailer fire. He was the command officer at the incident and was killed while investigating the type of cargo that was held within the refrigerated trailer involved in the fire. At approximately 0921 hours, the local public safety answering point (PSAP) received a call for a vehicle fire. While the incident was being dispatched to the responding units, the call type was updated to a tractor trailer fire with black smoke and multiple callers. Battalion 1 and Engine 11 were dispatched to the incident. Upon hearing the update from the dispatch center, Battalion 1 requested an additional engine company and that station 1 be re-paged for a tanker response. At approximately 0928 hours, Battalion 1 arrived on-scene and positioned past the involved tractor trailer, blocking traffic. Battalion 1 established command and sized the incident up as a tractor trailer fire with heavy fire involvement at the rear of the tractor, including tires and diesel fuel, with unknown cargo and occupant status. Battalion 1 provided a further update to all responding units that there was off- gassing at the rear of the tractor with an unknown source. He ordered Engine 11 to stop short, deploy an attack line from the front bumper, and utilize foam. Engine 11 stopped approximately 100’ short of the involved tractor trailer and deployed the 100’ 1 ¾-inch front bumper attack line. The Chief of the department (Chief 1101), who arrived just before Engine 11, assisted with deployment of the attack line. Engine 11’s officer extended the line with a 50’ section of attack line that was stored in the bumper well. At approximately 0931 hours, Battalion 1 updated dispatch that they had water on the fire and walked away from the engine crew. At approximately 0932 hours, while investigating at the rear of the trailer, Battalion 1 updated all units on-scene that the cargo was still unknown, but the rear of the trailer indicated it was refrigerated. At approximately 0933 hours, Battalion 1 attempted to open the rear trailer doors. The trailer Photo 1: Fire conditions on arrival of Battalion 1. (Photo courtesy of the fire department) REPORT F2024-05 • March 2025
Page ii Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05 exploded and Chief 1101 called to Battalion 1 on the radio stating they were okay. Battalion 1 did not acknowledge the message. At approximately 0934 hours, Chief 1101 updated dispatch that the trailer had exploded, was fully involved in fire, and he was going to check on Battalion 1. At approximately 0935 hours, Chief 1101 updated dispatch that Battalion 1 was down and requested air medical. At approximately 0937 hours, Chief 1101 assumed command of the incident and confirmed Battalion 1 was deceased on- scene. Contributing Factors • Standard operating procedures/guidelines (SOPs/SOGs) • Incident command • Risk/benefit analysis • Staffing • Hazard recognition, including control zone establishment with unknown hazard. Key Recommendations • Fire service organizations should develop and maintain SOPs/SOGs with industry best practices • Incident Commanders (ICs) should establish an Incident Management System (IMS) at all incidents • ICs should integrate risk assessment as a risk management practice into their fireground strategy and tactic SOGs/SOPs • Fire service organizations should follow the appropriate standards for organization and deployment of fire suppression operations, emergency medical operations, and special operations • ICs should establish control zones on incidents where immediately dangerous to life and health (IDLH) environments exist • Fire service training should provide insight and education towards commonly unrecognized pressure vessels in the form of intermodal freight trailers and mixed cargo trailers.
For further information, visit the program website at www.cdc.gov/niosh/firefighters/fffipp/ or call toll free 1-800-CDC-INFO (1-800-232-4636). To access the report slides that summarize this incident and the recommendations, visit www.cdc.gov/niosh/firefighters/programs/pdfs/face202405RS.pdf. The National Institute for Occupational Safety and Health (NIOSH) initiated the Fire Fighter Fatality Investigation and Prevention Program to examine deaths of fire fighters in the line of duty so that fire departments, fire fighters, fire service organizations, safety experts and researchers could learn from these incidents. The primary goal of these investigations is for NIOSH to make recommendations to prevent similar occurrences. These NIOSH investigations are intended to reduce or prevent future fire fighter deaths and are completely separate from the rulemaking, enforcement and inspection activities of any other federal or state agency. Under its program, NIOSH investigators interview persons with knowledge of the incident and review available records to develop a description of the conditions and circumstances leading to the deaths in order to provide a context for the agency’s recommendations. The NIOSH summary of these conditions and circumstances in its reports is not intended as a legal statement of facts. This summary, as well as the conclusions and recommendations made by NIOSH, should not be used for the purpose of litigation or the adjudication of any claim.
Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia
Page 1 REPORT F2024-05 • March 2025 Introduction On September 4, 2024, a 35-year-old battalion chief died while operating at a tractor trailer fire. On September 5, 2024, the U.S. Fire Administration notified the National Institute for Occupational Safety and Health (NIOSH) of this incident. From September 25 through October 2, 2024, two NIOSH Fire Fighter Fatality Investigation and Prevention Program (FFFIPP) investigators conducted interviews virtually with fire officers and firefighters who responded to the incident. Photos taken at the scene, computer aided dispatch (CAD) notes, radio traffic audio, helmet camera, body camera, and drive camera footage obtained from the fire department were reviewed. NIOSH investigators also reviewed the training records of personnel involved in the incident and reviewed the department’s SOPs and professional development model. Due to the virtual investigation, on September 16, NIOSH’s FFFIPP contacted the Fire Safety Research Institute (FSRI), part of the UL Research Institutes, to request assistance with fire analysis of this incident. Facts and the timeline surrounding the incident were discussed with the NIOSH team and gaps in the information were identified. Subsequently, on September 18, 2024, FSRI sent a team member to meet with the Chief of the Department to examine the remains of the trailer at a storage site in Georgia. The goal of the examination was to better understand the construction and fuel load of the refrigerated trailer itself. A sample of rigid foam insulation from the trailer was provided for testing to identify the foam type, and its potential as a fuel source for the smoke explosion. Fire Department Battalion 1 was a member of a combination fire department that has five stations with 31 full-time, 20 part-time, and 3 volunteer personnel that serve a population of approximately 25,000 within a 406 square mile area. The fire department is managed by a career fire chief employed by the county. The combination fire department is responsible for providing service to the entire county and has automatic aid agreements with the eight other volunteer departments located throughout the county. The area served by the department contains a myriad of occupancies including resorts, an airport, single and multiple family dwellings, light commercial, warehouses, and heavy industrial complexes. The fire department is responsible for structural fire, aircraft rescue firefighting services, hazardous material response, technical rescue, and emergency medical services (EMS). All department members, except for the fire chief, work a 24-hours on duty, 48-hours off duty rotating schedule. The minimum staffing for the department is 9 personnel including an on-duty battalion chief,
Page 2 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05 with full staffing of 11 personnel. The on-duty battalion chief oversees the staffing of five engine companies, one hazardous materials unit, and one brush unit operating out of five separate fire stations. Two personnel are assigned to each of the five stations. Fire and EMS are separate divisions within the department. Training and Experience Battalion 1 had 17 years of firefighting experience with a background in both the career and volunteer fire service. The minimum qualifications for the battalion chief position within the department include national certification in Firefighter I and II, Apparatus Operator-Pumper, Fire Officer 1, 2, and 3, Fire Instructor 1 and 2, Incident Safety Officer, and State Emergency Medical Technician Intermediate (EMT-I) or Advanced (AEMT), or Paramedic.
Battalion 1 had various professional certifications including Firefighter I and II, Hazardous Materials Awareness and Operations, Apparatus Operator - Pumper, Fire Officer 1, and Fire Instructor 1. He was promoted to the rank of battalion chief with an agreement that all necessary qualifications would be completed before the end of July 2026. This exemption was granted due to the department changing their professional development program for minimum standards within each rank. The department training records also indicated he had completed continuing education training in a variety of topics, such as pipeline emergencies, strategies and tactics of fire control, and building construction. Apparatus, Staffing, and Communications The minimum daily staffing of the combination fire department is comprised of four engine companies (minimum of two personnel each) and a battalion chief. The full, daily staffing of the combination fire department is comprised of five engine companies (minimum of two personnel each) and a battalion chief. The engine company personnel are responsible for staffing of and response with other apparatus housed in their station based upon call type. Emergency calls are received into a county PSAP which utilizes a Motorola P25 800-Megahertz (MHz) encrypted tri-county simulcast trunking system and a CAD system. All dispatchers are state certified and required to complete a minimum of 10 hours of continuing education annually. The PSAP personnel in this incident averaged over 25 hours of continuing education and is currently in the process of obtaining Emergency Medical Dispatching certification. Each dispatcher handles the call and incident through completion, regardless of type of call. The various CAD event codes may prompt the call taker to ask additional and specific questions to provide to dispatched companies. This PSAP has a minimum staffing of two operators per shift with typical staffing of three or four operators per shift. The county system averages 40,000 calls yearly including emergency and non-emergency incidents for the sheriff, local, and state police departments, a combination fire department, eight volunteer fire departments, and three EMS departments. The PSAP also receives calls for public works, city workers, three animal control offices, city water, city gas, Department of Natural Resources (DNR), and railroads. This incident was dispatched using the event code for a vehicle fire and the CAD generated a specific, predetermined response plan to dispatch the appropriate units. See Table 1 for the companies dispatched on the original call and Table 2 for the fire unit status and staffing at the time of the explosion.
Page 3 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05 Table 1: Initial Incident Dispatch Resource Designation Staffing Level Engine 11 2 Personnel Battalion 1 1 Personnel
Table 2: Fire Unit Status and Staffing at Time of Explosion Resource Designation Staffing Level Status Engine 11 2 Personnel On Scene Battalion 1 1 Personnel On Scene Chief 1101 1 Personnel On Scene Chief 8 1 Personnel On Scene Engine 12 2 Personnel Enroute Tanker 1 0 Personnel Dispatched, not enroute Personal Protective Equipment Upon arrival at the scene, Battalion 1 exited his command vehicle in his daily work uniform (i.e., uniform boots, long pants, sweatshirt, and ball cap). He was wearing a radio strap and holder that held his portable radio and remote speaker microphone. As the incident progressed, Battalion 1 also donned a high visibility safety vest as well as his leather structural firefighting helmet. The helmet met current Occupation Safety and Health Administration (OSHA) standards. Environmental Conditions The weather on September 4, 2024, at 0853 hours was fair with no precipitation. The temperature was 69°F with winds out of the north northeast at 10 miles per hour. The humidity was 63% [Weather Underground 2024]. It should be noted that in Diagram 2 and other images contained within this report, the wind at the location of the fire was out of the east-southeast direction. This may be due to obstructions or topography that are different from the recording weather station.
Page 4 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05 Involved Vehicle The vehicle involved in this incident was a tractor trailer style commercial vehicle (see Diagram 1 and Photo 2). The trailer portion of the vehicle consisted of a container chassis with a refrigerated intermodal container secured to the chassis with twistlocks on all four corners of the container. The refrigerated intermodal container had a portable generator, or genset, affixed to the bulkhead of the container. The genset in this incident ran on diesel fuel and included a self- contained diesel fuel tank on the lower portion of the genset device. Based on the information provided by the UL Research Institutes team, a visual inspection of the diesel tank did not present any evidence of bulging or rupture. The container was loaded with frozen chicken. The 2024 Emergency Response Guidebook (ERG) identifies this type of trailer as a type 111 intermodal freight container. These containers are for general freight that carry bulk or non-bulk packages. They may transport hazardous materials/dangerous goods in small packages (e.g., bags, boxes, drums) or intermediate bulk containers (IBCs), sometimes referred to as “totes”. These
Photo 2. Type 111 Intermodal Freight Container secured to trailer chassis with genset. (Photo courtesy of UL FSRI) Diagram 1: Type 111 road trailers. (Courtesy of 2024 Emergency Response Guidebook)
Page 5 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05 containers typically have the doors for entering the compartment at the rear opposite the bulkhead [PHMSA 2024]. A summary of FSRI’s trailer construction materials analysis findings can be found in Appendix One. Timeline The following timeline is a summary of events that occurred as the incident evolved. Not all incident events are included in this timeline. The times are approximate and were obtained by examining the dispatch records, audio recordings, witness statements, and other available information. All times are approximate and rounded to the closest minute. The timeline is not intended, nor should it be used, as a formal record of events. Time (hours) Fireground Operations, Response, and Details 0921 • PSAP case created and unit recommendations for vehicle fire response initiated. 0923 • Battalion 1 and Engine 11 dispatched. o PSAP updated responding units that they have received multiple calls of a tractor trailer box truck with black smoke coming from it. 0924 • Battalion 1 and Engine 11 enroute. 0927 • Battalion 1 requests additional engine company and Station 1 be re-paged for a Tanker. 0928 • Battalion 1 on-scene, established command. o “Heavy fire involvement at the rear of the tractor, unknown occupant status, unknown cargo”
0929 • Battalion 1 provides update to all responding units. o “Some type of off-gassing at the rear of the tractor, unknown source” 0930 • Battalion 1 orders Engine 11 to stop short and deploy the bumper line and begin using foam. 0931 • Engine 11 has water on the fire. 0932 • Battalion 1 updates all units on-scene stating, “unknown what the cargo is, it is a refrigerated trailer according to the rear.” 0933 • Trailer explodes.
Page 6 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05 Investigation On September 4, 2024, at approximately 0921 hours, the local PSAP received a call for a vehicle fire. The case was generated in the CAD system and the call taker gathered information. While the incident was being dispatched, the call type was updated to a tractor trailer fire with black smoke reported by multiple callers. The companies dispatched on the original call included Battalion 1 and Engine 11, see Table 1. Upon hearing the update from the dispatch center, Chief 1101 called Battalion 1 by mobile phone to suggest the upgrade of the assignment as well as to let Battalion 1 know he was enroute. Battalion 1 said he would be able to see what they were dealing with momentarily and they hung up. Battalion 1 could see a significant smoke column and requested an additional engine company and that Station 1 be re-paged for a tanker response, see Table 2. Chief 8 self-dispatched to the scene to assist. Time (hours) Fireground Operations, Response, and Details • Chief 1101 calls command, “everyone is 10-4 over here.” • Chief 1101 calls Battalion 1, “Are you okay?” 0934 • Chief 1101 updates dispatch, “large explosion, trailer now fully involved, the entire trailer blew apart.” • Chief 1101 going to check on Battalion 1. 0935 • Chief 1101 updates all units, “cannot find Battalion 1.” • Chief 1101 updates, “Battalion 1 is down. Needs helicopter.” 0937 • Chief 1101 assumes command. o Chief 1101 confirmed that Battalion 1 is deceased on scene. o Chief 1101 updates still working on fire attack, contents of trailer still unknown. 0938 • Chief 1101 confirmed contents of the trailer as frozen chicken. 0958 • Chief 1101 transfers command to Engine 13 o Still fighting fire, Personnel accountability report (PAR) okay, 6 personnel working. 1028 • Fire is knocked down. Hitting hot spots. 1528 • Command terminated. • Scene turned over to Sheriff’s Office. • Roadway still closed.
Page 7 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05 At approximately 0928 hours, Battalion 1 arrived on-scene and positioned his vehicle past the involved tractor trailer on the North side, blocking the south bound lanes to close the road in that direction. Battalion 1 established command of the incident and sized the incident up as a tractor trailer fire with heavy fire involvement at the rear of the tractor including the tires and diesel fuel tanks. The fire from the rear of the tractor provided direct flame exposure to the underside of the front portion of the trailer. The fire extended up between the rear of the tractor’s cab and the front of the trailer. The cargo and occupant status were unknown upon his arrival and relayed to the dispatch center. Battalion 1 provided an additional update to all responding units that there was off-gassing and fire involvement at the rear of the tractor from an unknown source. He ordered Engine 11 to stop short, South of the incident, deploy an attack line from the front bumper, and utilize foam. Engine 11 stopped approximately 100’ short of the involved tractor trailer and deployed the 100’ 1¾- inch front bumper attack line. Chief 1101, who arrived just before Engine 11, assisted with deployment of the attack line. Engine 11’s officer extended the line with a 50’ section of attack line that was stored in the bumper well. At approximately 0931 hours, Battalion 1 updated dispatch that they had water on the fire and walked away from the engine crew. At approximately 0932 hours, while investigating at the rear of the trailer, Battalion 1 updated all units on-scene that the cargo was still unknown but the rear of the trailer indicated it was refrigerated. At approximately 0933 hours, as Battalion 1 attempted to open the rear trailer doors, the trailer exploded Diagram 2: Approximate locations of all on scene apparatus and attack line at the time of explosion. (Diagram prepared by NIOSH)
Page 8 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05 and Chief 1101 called to Battalion 1 on the radio, stating they were okay. Battalion 1 did not acknowledge the message. At approximately 0934 hours, Chief 1101 updated dispatch that the trailer had exploded, was fully involved in fire, and he was going to check on Battalion 1. At approximately 0935 hours, Chief 1101 updated dispatch that Battalion 1 was down and requested a medical helicopter. At approximately 0937 hours, Chief 1101 assumed command of the incident and confirmed Battalion 1 was deceased on-scene. Chief 1101 updated that crews were still working on fire attack, and contents of the trailer were still unknown. At approximately 0938 hours Chief 1101 confirmed with the driver that the cargo was frozen chicken.
Photo 3 and Photo 4. View of fire behavior on passenger side of vehicle (top photo) and view from the fire attack team as Battalion 1 declared water on the fire (bottom photo). (Photos courtesy of fire department)
Page 9 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05 At approximately 0958 hours, Chief 1101 transferred command to Engine 13, crews were still fighting fire, PAR was okay, and they had six personnel working. At approximately 1028 hours, command reported the fire was knocked down with crews still extinguishing hot spots. At approximately 1528 hours, command was terminated, the scene was turned over to the Sheriff’s Office, and the roadway would remain closed. Cause of Death According to the State Bureau of Investigation, Department of Forensic Sciences report, an autopsy was performed by the Office of the Medical Examiner. The manner of death was classified as an Photo 5. View of driver side of involved vehicle following extinguishment. (Photo courtesy of fire department) Photo 6. View of passenger side of involved vehicle following extinguishment. (Photo courtesy of fire department)
Page 10 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05 accident. It was noted Battalion 1 was in close proximity to a vehicular fire and explosion. The cause of death was listed as blunt force, blast, and thermal injuries of the head and torso. Contributing Factors Occupational injuries and fatalities are often the result of one or more key contributing factors in a larger sequence of events. NIOSH investigators identified the following items as key contributing factors that likely led to this fatality: • SOPs/SOGs • Incident Command • Risk/benefit analysis • Staffing • Hazard recognition, including control zone establishment with unknown hazard. Recommendations Recommendation #1: Fire Service Organizations should develop and maintain SOPs/SOGs with industry best practices. Discussion: SOPs/SOGs establish the basic framework for conducting emergency operations safely and effectively. Some procedures are specifically directed toward safety; others support safe operations by establishing a system of predictable and consistent operations. Coordination, consistency, and standard approaches are all important and valuable components of safe emergency operations [USFA 2018]. In this incident, the IC was the first to arrive on the scene. The IC provided a scene size up report and established command. He positioned his apparatus to provide a safe working area for incoming crews and to establish a Traffic Incident Management Area (TIMA) [NFPA 1091 2024]. The IC then made the effort to perform his 360-degree size up as dictated by the department SOGs. But, due to the smoke drift, only about 270-degrees of the incident was viewed immediately upon his arrival. Once Battalion 1 exited his vehicle he completed his 360-degree size-up, provided his incoming units with updates including something off-gassing at the rear of the tractor, the level of fire involvement, and their initial set of orders on arrival. Following the initiation of fire attack by the first arriving engine and additional personnel who arrived in non-suppression apparatus, the IC continued to operate within the hot zone of the incident in an investigation mode. The purpose of the IC operating within the hot zone performing investigation was to determine the cargo being transported by the motor carrier. NFPA 1550 section 6.2.2, Standard for Emergency Responder Health and Safety, states that fire departments should prepare and maintain written policies and SOPs that document the organization structure, membership, roles and responsibilities, expected functions, emergency operations, and training requirements. This includes:
Page 11 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05 • the types of standard evolutions that are expected to be performed • the evolutions that must be performed simultaneously or in sequence for different types of situations • the minimum number of members required to perform each function • the number and types of apparatus and personnel that will be dispatched to different types of incidents in accordance with NFPA 1710 or NFPA 1720. The standard also states these SOPs should specify the procedures that will be employed to initiate and manage operations at the scene of an emergency incident and post-incident control and mitigation of emergency scene contaminants [NFPA 1550 2024]. The department in this incident provided copies of their SOGs for the NIOSH investigators to review. The SOGs contain the requirements for personnel operating on vehicle fires, specifically commercial vehicle fires. The SOG covering incidents where fire is showing requires personnel to be in full protective clothing, including self-contained breathing apparatus. If the vehicle involved is a tractor trailer, the SOG states that command should be in the investigation mode to determine if any hazardous materials are involved. If there are hazardous materials, the type and amount of material should be determined, and command should refer to the appropriate hazardous material SOG. If there are no hazardous materials or if the vehicle involved is a bus, then a search for any victims should be made. Fire service organizations with similar SOGs could benefit from adding language about conducting this type of investigation from outside of the hot zone, preferably uphill and upwind whenever possible. Additionally, ensuring the incident response meets the requirements set forth by the applicable NFPA 1710 or NFPA 1720 standard allows for additional personnel to respond and perform necessary tasks, reducing task oversaturation by individual personnel. The frequency at which SOGs should be reviewed and revised is also specified within NFPA 1550 section 6.2.4. The standards articulate that fire departments should evaluate current trends and research to determine if policies and procedures are appropriate at least annually or following a near miss or catastrophic event [NFPA 1550 2024]. The guidelines under which the department was operating on this incident were effective as of August 2022 and were due for review in August 2023 based upon the recognized best practice set forth in the standard. The department confirmed that they perform SOG reviews and training on a rolling calendar basis and intend to continue doing so. Fire service organizations could benefit from revisiting SOPs/SOGs in their system at least annually as well as evaluating SOPs/SOGs for appropriate risk management strategies. As written, SOPs/SOGs support safe operations and avoid unnecessary risk while allowing for deviation when necessary. Recommendation #2: ICs should establish an IMS on all incidents. Discussion: ICs are responsible for everything that occurs on the fireground. This includes being able to decipher all the information that is presented to them upon their arrival at the incident, make sound decisions, develop an Incident Action Plan (IAP), and employ an IMS on all incidents. Personnel
Page 12 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05 cannot control the specific emergency they will face when they arrive to an incident. However, a well- developed command system and training program provides a solid base for personnel to refer to while operating [Pieper 2020]. NFPA 1550 Chapter 21 Command Safety states that the first arriving responder from an emergency services organization has responsibility for the incident, should assume the role of IC for the incident, and maintain the following responsibilities [NFPA 1550 2024]: • Conduct an initial and ongoing situational assessment of the incident • Establish an effective communications plan • Develop incident objectives from the situational assessment and form applicable strategy and tactics • Develop an IAP for the management of the incident • Review, evaluate, and revise the strategy and tactics based on the needs of the incident and deploy resources as needed • Provide for the continuity, transfer, or termination of command • Maintain an effective supervisory span of control. Industry best practices recommend that the IC establish an incident command post (ICP) and remain in the immediate area for the duration of the incident. It is up to the department and IC to determine the most appropriate command post for their incident. Some command post examples include the front lawn or Alpha/address side of a structure, inside the cab of the apparatus with the best vantage point, or the IC’s vehicle. NFPA 1550 standard 21.11 states how the IC should choose and set up their ICP in the initial stages of an incident. Specifically, the standard states how to provide safety for the command staff of an incident based on whether it is a single commander or a team. It would benefit the IC to select an ICP that includes the following considerations [OSFC 2003, NFPA 1550 2024]: • Sound – If the ICP is quiet, there is less of a chance for the IC to miss radio transmissions. • Location – Although ICs want to be able to see as much as they can, it is important to provide a buffer from staging crews and distractions. The ICP should be located in the cold zone of an incident. • Stationary – Moving ICs may find it more difficult to maintain focus as there are more opportunities for them to be distracted. • Better radio – Most apparatus and command vehicles have a more powerful radio than the portable radio issued to personnel. • Protection from the elements – A warm or cool and dry ICP will allow for the IC to concentrate on the incident.
Page 13 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05 • Place to write and record – It is imperative that an IC can write or record information related to operations, whether it be crew assignments, which units are in staging, mayday information, or even something as simple as a phone number. • Better intel equipment – An IC wants to know anything and everything about the incident, whether it is hazardous materials, occupancy data, target hazard information, etc. There are times when conditions outside the ICs control prevent the first arriving officer from taking a command role and they must engage in operations on the fireground. This could be an instance of less- than-ideal staffing, an imminent rescue, or a situation that requires the IC to take an investigation style stance. Investigation mode means the IC must determine what conditions are for the incoming crews. This could include determining involvement of hazardous materials, fire conditions, occupancy status, etc. Referring to the previous recommendation, fire department policies should acknowledge this reality while also setting the expectation that ICs should be performing command functions and not operational functions. Exceptions to this are infrequent and not the rule of day-to-day operations. If the IC must perform in an investigative role, it is imperative that they transfer command to the next arriving qualified officer or remove themselves from the command role as soon as possible [Pieper 2020]. The SOGs provided by the fire department in this incident for vehicle fires specifically direct the IC to be in an investigation mode and not in a command position. This forces the IC to be engaged in some level of operations inside the hot zone versus being in a controlled and safer environment with a good vantage point of ongoing operations. The Incident Command SOG for the involved department also does not specify the methodology the command officers should follow on arrival other than establishing command, giving the size-up report, mode of operation, and delegating assignments. Specifying the need for a relatively stationary command setup and the necessity of employing an accountability system and IAP for the incident is important. The Incident Command Structure (ICS) is a standardized approach to the command, control, and coordination of on-scene incident management that provides a common hierarchy within which personnel from multiple organizations can be effective. ICS specifies an organizational structure for incident management that integrates and coordinates a combination of procedures, personnel, equipment, facilities, and communications. Deploying the ICS on every incident can help hone and maintain skills needed to coordinate efforts effectively, is applicable across disciplines, and enables incident managers from different organizations to work together [FEMA 2017]. Recommendation #3: ICs should integrate risk assessment as a risk management practice into their fireground strategy and tactic SOGs/SOPs. Discussion: In this incident, the IC followed the department SOGs that were specifically developed for a tractor trailer fire. He established command, provided a size-up, gave the initial company orders, and requested additional resources. Then, based on the direction of the SOGs, the IC entered the hot zone multiple times to investigate what the tractor trailer was hauling. He stated over the radio that the trailer contained unknown content on more than one occasion. He stated the trailer was refrigerated.
Page 14 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05 Applying different risk management techniques in coordination with following the SOGs may have limited the number of personnel operating in the hot zone of the incident. The concepts of operational risk management have always been important considerations for emergency response organizations [USFA 2018]. Some risks are unavoidable and are accepted as part of the duty of a firefighter or line officer. The nature of the activities of emergency responders exposes them to a high level of inherent risk. Conditions or circumstances can exist in which the proper response is to not take actions that could place the lives of responders in danger [USFA 2018]. Fire service personnel can reduce the risk of injury or death while operating on the fireground if they are able to identify the nature of the threat, determine the risk potential, and incorporate risk management practices into the operational plan. A high level of risk management is involved in directing emergency operations and in regulating the responders’ exposure to emerging incident hazards. Emergency incident risk management expands the standard approach to directing and conducting emergency operations by incorporating risk evaluation and the assessment of optional approaches to the problems at hand. NFPA 1550 standard 18.3.2.1 states that the IC should integrate risk management practices in the regular functions of incident command and at emergency operations the IC should evaluate the risk to members operating at the scene [NFPA 1550 2024]. This means the IC should determine the life safety profile of the incident and apply the most appropriate level of risk to first responders consistent with the following principles shown in Chapter 10.4 of NFPA 1550 [2024]: • Activities that present a significant risk to the safety of members should be limited to situations where there is a potential to save endangered lives. • Activities that are routinely employed to protect property should be recognized as inherent risks to the safety of members, and actions should be taken to reduce or avoid these risks. • No risk to the safety of members should be acceptable when there is no possibility to save lives or property. • In situations where the risk to fire department members is excessive, activities should be limited to defensive operations. There are times in which a tactical command style can be beneficial. Chief Curt Isakson explains that the command style known as “tactical command” is out of a command vehicle, equipped with all personal protective equipment, and involved in a more up close and personal size-up which assists in not only managing the incident but also in getting personally involved in the mitigation of the incident. He also expresses his perspective of the importance of choosing the command style or mode to fit the incident and that there is not always a one size fits all approach. The command location and style must fit the incident to provide the best outcome for life-safety of both civilians and firefighters, while still placing property as a second priority [Isakson 2021]. In this incident, the contents of the trailer were unknown other than it was refrigerated. The bulk of the fire was located between the rear of the tractor and the trailer bulkhead. Bystanders told the IC that the
Page 15 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05 driver was out of the vehicle and had fled the scene. The department SOG for tactical priorities listed the hierarchy of the incident as follows:
- Life safety
- Incident stabilization
- Property conservation.
Knowing the driver of the tractor trailer departed the vehicle partially eliminates the life safety concern. Without knowing if it was a driver team or a single driver, the priority cannot totally be ignored without contacting the driver who fled the scene. Battalion 1 gave orders to the first arriving engine company to stop short of the incident and to stretch an attack line for fire attack. This began the process of addressing the priority of incident stabilization. Risk assessment, as part of an overall risk management process, is ongoing throughout the entirety of an incident starting at the arrival of the first emergency responder until the incident is deemed over and command is terminated. All actions and tactics should have any new or changed information applied to them to ensure personnel safety and operational effectiveness. The role of the IC can be very overwhelming and difficult when the incident is complex and multifaceted. The IC has overall authority for the management of the incident and for some it can be a daunting task. The ICS provides a framework that allows it to be adapted and scaled based upon the incident [NFPA 1550 2024]. Recommendation #4: Fire service organizations should follow the appropriate standards for organization and deployment of fire suppression operations, emergency medical operations, and special operations. Discussion: The department involved in this incident became a combination fire department in 2019. NFPA 1720 section 3.3.16.1 defines a combination fire department as one having emergency service personnel comprising less than 85 percent majority of either volunteer or career membership. NFPA 1720 section 3.3.16.2 defines a volunteer fire department as a fire department having volunteer emergency service personnel comprising 85 percent or greater of its department membership [NFPA 1720 2020]. Although it is not clear which standard they were following, the department in this incident should have been utilizing the information in NFPA 1710 due to the percentage of volunteer membership being approximately 5.6 percent of the total membership. Chapter 5 of NFPA 1710 provides minimum standards for staffing of various fire suppression companies. The department involved in this incident is responsible for primarily staffing engine companies. Engine companies are fire companies whose primary functions are to pump and deliver water as well as perform basic firefighting and search and rescue. Further, these companies should be staffed with a minimum of four on-duty members. However, the standard recommends that these companies be staffed with a minimum of five on-duty members in first-due response zones that experience a high number of incidents, geographical restrictions, geographical isolation, or urban areas, as identified by the authority having jurisdiction [NFPA 1710 2020].
Page 16 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05 If the department were operating under the NFPA 1720 standard as a combination department, the following information should be utilized with the implementation of more volunteer membership. Based on the metrics provided by the department, the county could be considered a rural and remote area. Specifically, there is less than 50 people per square mile and a travel distance from the second due engine is greater than eight miles [USCB 2020]. The data preceding this shows that the staffing should be six personnel within 14 minutes of dispatch at least 80% of the time. Table 3 displays the staffing and time standards for volunteer and combination fire departments as specified in NFPA 1720. Table 3: Staffing and Response Time (Adapted from NFPA 1720) Demand Zone Demographics Minimum Staff to Respond Response Time (Minutes) Meets Objective (%) Urban area
1,000 people/mi2
(2.6 km2) 15 9 90 Suburban area 500 – 1,000 people/mi2 (2.6 km2) 10 10 80 Rural area people/mi2 (2.6 km2) 6 14 80 Remote area Travel distance ≥ 8 mi (12.87 km) 4 Directly dependent on travel distance 90 Special risks Determined by AHJ Determined by AHJ based on risk Determined by AHJ 90
Page 17 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05 Recommendation #5: ICs should establish control zones on incidents where IDLH environments exist. Discussion: NFPA 1550, chapter 18.3.1.4, states the IC should have the responsibilities and duties of all unassigned incident command system positions. In organizations where personnel are not plentiful and arriving early at incidents, this creates a situation in which task oversaturation for the IC can happen quickly. NFPA 1550 chapter 5 states the Incident Safety Officer (ISO) role is a position within the ICS at an incident or planned event that is charged with ensuring action is taken to mitigate any immediate life safety threats. Within the scope of the ISO position is the necessity to determine hazardous incident conditions and advise the IC to establish or modify control zones at any given incident. These control zones must be communicated to on-scene personnel and entry into the hazardous area must be controlled by the ISO as specified in chapter 5 of NFPA 1550. These actions require the ISO to possess comprehensive knowledge of hazardous conditions, operations, departmental SOPs/SOGs, control zones protocols, and the IMS. An ISO also needs to be able to evaluate the effect of proximity for incident hazards so that risk to members will be limited to emergency responders assigned tasks to mitigate the incident (i.e., in the hot zone) [NFPA 1550 2024]. In this incident, the IC applied various techniques that fell under responsibilities of an ISO. He ordered Engine 11 to stop short of the affected vehicle, placing it outside of the hazard zone. He applied the process outlined in the department SOGs and attempted to locate the driver as well as determine if the cargo was considered a hazardous material. The IC also communicated all other hazards noticed during his ongoing investigation of the incident including that there was something off-gassing at the rear of the tractor and that the trailer was refrigerated. The International Fire Service Training Association (IFSTA), Essentials of Fire Fighting 8th Edition: Firefighter 1, states that control zones can have a variety of labels depending on operations being conducted within those zones. The most common terms used to describe these areas are hot, warm, and cold zones. The hot zone is the area closest to the hazard such as a fire or hazardous material. This is where trained personnel work to mitigate the problem. Only personnel directly tasked in mitigating the problem are allowed to enter this zone, which limits crowds and confusion at the most critical area of the scene. Diagram 3: Incident Scene Control Zones 1. (Courtesy of International Fire Service Training Association)
Page 18 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05 These personnel wear protective clothing and equipment appropriate for the incident’s hazards [IFSTA 2024]. The warm zone is immediately outside the hot zone and serves as the transition area. Personnel in the warm zone directly support personnel working in the hot zone by providing emergency lighting, fire protection, or other support functions. These personnel wear full protective clothing and equipment and are ready to enter the hot zone if needed [IFSTA 2024]. The cold zone surrounds the warm and hot zones. The cold zone may include the ICP and locations for the rapid intervention crews, public information officer, rehabilitation area, and staging areas for personnel and portable equipment. The outer boundary of the cold zone serves as the control line for the general public (i.e., crowd-control line). Personnel working in the cold zone should wear protective clothing and equipment appropriate for the tasks they must perform and the hazards they may encounter [IFSTA 2024]. Photo 7 and Photo 8. Driver side of trailer just prior to explosion (left photo) and change of smoke behavior and expansion of container as explosion is occurring (right photo). (Photos courtesy of fire department)
Page 19 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05 Recommendation #6: Fire Service training should provide insight and education around commonly unrecognized pressure vessels in the form of intermodal freight trailers and mixed cargo trailers. Discussion: The 2024 edition of the ERG indicates there are several types of road trailers in use in the United States and includes a road trailer identification chart for emergency responders. Several of these trailers call out either design pressures or maximum allowable working pressures (MAWP). The road trailer involved in this incident was a 111 intermodal freight container. The ERG lists distinctive characteristics and uses for this type of trailer [PHMSA 2024] Including: • For general freight that carry bulk or non-bulk packages • May transport hazardous materials/dangerous goods in small packages (e.g., bags, boxes, drums) or IBCs, sometimes referred to as “totes” • Cargo door(s) in the rear. What is not provided through the ERG is the MAWP for several types of trailers including the 111 intermodal freight container. The other trailer types identified with no noted MAWP include the 117 compressed gas/tube trailer, 134 dry bulk cargo trailer, and 137 vacuum tanker. The fire service is not taught to recognize type 111 trailers as a pressure vessel. When impinged by fire, these trailers can become pressurized. The same fire dynamics principles that apply to structure fires, apply here as well. As the temperatures inside of a closed compartment increase, the pressure inside the compartment also increases. Without a sufficient pressure relief vent(s), the pressure continues to build. The Type 111 trailers, when configured for refrigerated applications, have void spaces between the inner and outer floor, walls, and roof that are filled with combustible foam plastic insulation. This means that even an empty trailer has a significant fuel load. Additionally on this unit, there was an integrated refrigeration unit that consisted of pressurized cooling lines and a compressor system much like in a typical refrigerated trailer. The various containers integrated into the refrigeration system could suffer a catastrophic failure as the refrigerant becomes heated when exposed to fire. This could eventually lead to a boiling liquid expanding vapor explosion (BLEVE). In this incident, the refrigeration overpressure appeared to ventilate and maintain safer pressures. This incident is not believed to be the result of a BLEVE. In the Principles of Heavy Vehicle Extrication by IFSTA [2023], personnel are taught the five-step process for heavy vehicle extrication which includes the following steps:
- Identify vehicle and cargo weight hazards (identify the load)
- Stop the crush
- Lower the smaller vehicle
- Lift the load
- Separate and extricate.
In this incident, the vehicle was upright on its wheels. The first applicable step of the process upon arrival is identifying the load. Part of identifying the load is contacting the driver of the vehicle who
Page 20 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05 should know what they are hauling. In this incident, Battalion 1 was unable to locate the driver of the vehicle because they left the immediate area. The driver was located later into the incident by Chief 1101 and the cargo information was relayed after the explosion occurred. The trailer was not placarded to indicate any hazardous materials and Battalion 1 approached the rear of the trailer to further investigate. He eventually tried to open the rear cargo doors of the trailer at the same time the trailer suffered a catastrophic failure. The IFSTA Principles of Heavy Vehicle Extrication states that if a cargo area of a tractor trailer or box truck is involved in fire, consider calling for additional suppression resources as these fires require extensive overhaul operations [IFSTA 2023]. The fire service at large is aware of the potential surrounding a catastrophic failure of tank trailers or fuel tanks such as a BLEVE or a burn through that contributes to significant fire growth and potential. However, the same care is not taught for type 111 trailer responses, which may support more complacent responses. A smoke explosion, like this case, can happen in any fire in a compartment. This could be a structure fire, or something different such as the trailer in this instance. The key indicators as the compartment is filled with products of combustion and oxygen is consumed or limited all it takes is the introduction of oxygen to the mixture to support a violent reaction. The IFSTA Principles of Heavy Vehicle Extrication teaches the explosion hazards of undeployed air bags, energy- absorbing bumper struts, support struts (such as in hoods, trunks, and hatchbacks), suspension struts, shock absorbers, fuel containers, seatbelt pretensioners, and vehicle tires. The fire service should be taught that even though explosion hazards are less prevalent than fire hazards, there is a risk associated with explosion hazards at heavy vehicle incidents [IFSTA 2023]. The dangers of the unrecognized pressure vessel can be deadly, as seen in this incident. One pressure vessel that is present on every vehicle fire are the tires of the vehicle. Fire service personnel are educated of the potential dangers when these rupture but is not emphasized to the level it could be. Commercial vehicle tires contain significantly more pressure than passenger car tires before they are on fire. Tires rupturing without being impinged in fire have incredible force potential and fires amplify the force potential. Another commonly overlooked or unrecognized pressure vessel are the various air bags in commercial vehicles. These are in the suspension, the cab supports, and even the seats inside the passenger compartments. Fire service personnel must be educated to identify these other less known pressure vessels including the cargo compartments of the vehicle, especially when they are the refrigerated style. Pressure can build in these containers unbeknownst to fire service personnel operating in their vicinity with potentially deadly outcomes. A summary of FSRI’s fire analysis findings can be found in Appendix Two. References FEMA [2017]. National incident management system. Washington, D.C.: U.S. Department of Homeland Security, Federal Emergency Management Agency.
IFSTA [2023]. Principles of heavy vehicle extrication. Stillwater, OK: International Fire Service Training Association.
Page 21 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05 Isakson C [2021]. Command & control success: Command post location. Retrieved October 2024, from Firehouse: https://www.firehouse.com/leadership/incident-command/article/21243635/command- control-success-command-post-location
ISFSTA [2024]. Essentials of fire fighting. 8th ed. Stillwater, OK: International Fire Service Training Association.
NFPA [2020]. NFPA 1710, Standard for the organization and deployment of fire suppression operations, emergency medical operations, and special operations to the public by career fire departments. Quincy, MA: National Fire Protection Association.
NFPA [2020]. NFPA 1720, Standard for the organization and deployment of fire suppression operations, emergency medical operations, and special operations to the public by volunteer fire departments. Quincy, MA: National Fire Protection Association.
NFPA [2024]. NFPA 1061, Standard for traffic incident management personnel professional qualifications. 12. Quincy, MA: National Fire Protection Association.
NFPA [2024]. NFPA 1550, Standard for emergency responder health and safety. Quincy, MA: National Fire Protection Association.
OSFC [2023]. Officers command: 8 functions of command. Lewistown, PA: Pennsylvania Office of the State Fire Commissioner.
PHMSA [2024]. Emergency Response Guide. Washington, D.C.: U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration.
Pieper S [2020]. 4 essential elements for fire incident command policies and procedures. Lexipol.
USCB [2020]. QuickFacts Greene County, Georgia. Washington, D.C.: U.S. Department of Commerce, U.S. Census Bureau.
USFA [2018]. Risk management practices. Washington, D.C.: U.S. Department of Homeland Security, Federal Emergency Management Agency, U. S. Fire Administration. Retrieved October 2024, from
Weather Underground [2024]. Augusta, GA weather history. Weather Underground. Investigator Information This incident was investigated by Louis (Rick) Lago (former), Investigator, and Stephen J. Ringer, Investigator, both with the Fire Fighter Fatality Investigation and Prevention Program, Surveillance and Field Investigations Branch, Division of Safety Research, NIOSH located in Morgantown, WV. The report was written by Stephen J. Ringer. Dan Madrzykowski and Keith Stakes from the Fire Safety Research Institute, part of the UL Research Institutes, provided an expert review of the
Page 22 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05 expert review of the investigation report. The NFPA Emergency Response & Responder Safety Division also provided a technical review. An expert technical review was provided by Thomas Cook, CPSE credentialed Chief Fire Officer and Chief Training Officer. Disclaimer The information in this report is based upon dispatch records, audio recordings, video recordings, witness statements, and other information that was made available to the National Institute for Occupational Safety and Health (NIOSH). Information gathered from witnesses may be affected by recall bias. The facts, contributing factors, and recommendations contained in this report are based on the totality of the information gathered during the investigation process. This report was prepared after the event occurred, includes information from appropriate subject matter experts, and is not intended to place blame on those involved in the incident. Mention of any company or product does not constitute endorsement by NIOSH, Centers for Disease Control and Prevention (CDC). In addition, citations to websites external to NIOSH do not constitute NIOSH endorsement of the sponsoring organizations or their programs or products. Furthermore, NIOSH is not responsible for the content of these websites. All web addresses reference in this document were accessible as of the publication date.
Page 23 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05 Appendix One Trailer Construction Materials Findings (Courtesy of UL FSRI) At the time of the examination, the heavily damaged tractor trailer had been moved to a storage area and was basically in 5 pieces (areas). The remains of refrigerated trailer (intermodal shipping container), the trailer frame that the intermodal container sat on, remains of the tractor, the diesel generator that powered the refrigeration system, and cargo that is in 3 roll off dumpsters. The intermodal portion of the refrigerated trailer had been reduced to the floor, front wall, and some sections of the sides, Figure 1. The floor, walls and roof of the refrigerated trailer had void spaces between the exterior metal of the trailer and the interior metal lining of the trailer. By design, the void spaces were filled with a blown in foam that sets up as a rigid foam plastic. This provides the insulation for the refrigerated trailer. This foam could be a significant source of fuel. It was noted that foam insulation had been consumed completely or showed significant mass loss in areas of the trailer that had been exposed to the exterior fire sources.
Photo 9 and Photo 10. Photographs of the remains of the refrigerated trailer. Rear view on the left and front view on the right. Most of the foam insulation had been burned out of the front portion of the trailer. (Photos courtesy of UL FSRI)
Page 24 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05
Photo 11 and Photo 12. Some of the remaining foam insulation. Partially charred foam from a wall panel (left photo) and partially charred foam in the floor section of the trailer (right photo). (Photos courtesy of UL FSRI) Photo 13 and Photo 14. The foam sample from the trailer flooring section that was provided for testing. Bottom of the sample (left photo) and top of the sample (right photo). (Photos courtesy of UL FSRI)
Page 25 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05 Foam Analysis The foam samples used for testing were cut out of the foam from the truck, so that no char or residue were part of the test samples. A pyrolysis gas chromatography with mass spectrometry (Py/GC-MS) analysis of the foam was conducted. This type of analysis is used to evaluate the chemical composition of pyrolyzates from a wide range of organic materials, providing information to identify the test material. Organic materials such as foam plastics that can be pyrolyzed can be analyzed by GC-MS. The mass spectrum is used to identify the compounds in the sample and compare them against a library of known materials, to identify the best match for the pyrolyzed sample. Samples of the foam were prepared as a powder to ensure the sample was homogeneous for Py/GC- MS and microscale combustion calorimetry experiments. The temperature range for the pyrolysis of the sample was 300-900 °C with a temperature ramp of 5 °C/s. Pyrolyzates were directed into the GC- MS column and identified by the MS. Peaks consistent with polyisocyanurate foam were observed in the chromatogram. The polyisocyanurate foam was also subjected to a series of tests to determine its potential heat release rate capability. Powdered foam samples were tested with the microscale combustion calorimeter (MCC) in general accordance with ASTM D 7309-21. The samples were heated from room temperature to 700°C at a heating rate of 1°C/s. The peak specific heat release rate in the MCC was observed at 371 °C and was measured as 293 W/g and the specific heat of combustion was 25.4 MJ/kg. Foam samples, approximately 100 mm square and 25 mm thick, were tested in the cone calorimeter in general accordance with ASTM E 1354-23. Cone samples were tested at radiant exposures of 25 kW/m2, 50 kW/m2, and 75 kW/m2. Two of the cone calorimeter results for the 75 kW/m2 are presented here, the averaged peak heat release rate of 697 kW/m2 and the averaged heat of combustion of 20.2 MJ/kg. The higher heat flux was chosen to represent the heat flux closest to flame impingent from the outside of the truck. The measure protocols and the full dataset created can be viewed at https://materials.fsri.org/materialdetail/polyisocyanurate-spray-foam Compared to materials like wood, https://materials.fsri.org/materialdetail/wood-stud, under similar test conditions, the foam insulation has an average peak heat release rate twice as high as wood, and an average heat of combustion, 30% higher than wood. The fire service take away, even if the refrigerated trailer were empty, it still has a large fuel load, with the potential for significant fire or explosion hazard. The material analysis of the foam shows that its pyrolyzates and combustion products could have been a source of fuel for the smoke explosion that occurred within the trailer.
Page 26 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05
Summary In addition to fuel sources such as tires and diesel fuel, the fire service needs to recognize other fuels that are used in the construction of the tractors and trailers, including fiberglass and foam insulation. Furthermore, based on the fire analysis of the incident there are several considerations for the fire service regarding refrigerated trailer fires due to the insulating foam, the trailer contains a significant amount of fuel (hazard), even if it is empty. Photo 15 and Photo 16. One of the foam samples prepared for testing in the cone calorimeter (left photo) and amount of flame generated by the foam sample during a cone calorimeter test (right photo). (Photos courtesy of UL FSRI)
Page 27 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05 Appendix Two Fire Analysis Findings (Courtesy of UL FSRI) Still images taken from a video of the incident show notable changes to smoke and fire coming from the trailer. The smoke and flames prior to suppression seem to cycle, build, stop, and start again, see Photos 17 through 19. After initial knockdown, the smoke from the trailer again seems to cycle or pulse until the explosion, Figure 8. After the explosion the ventilation limited/fuel rich environment is the truck resulted in a vent point ignition, followed by an increased amount of fire, Figures 9 and 10. The images captured throughout the incident captured pulsating fire behavior indicative of the onset of a smoke explosion.
Photo 17 and Photo 18. The photograph on the left shows the fire at approximately 0928, the fire has been burning for almost eight minutes. The images are approximately two seconds apart. The photograph on the right shows a noticeable amount of dense black smoke from the underside of the trailer. It seems to have enough pressure to flow against the direction of the wind, then it stops. (Photos courtesy of UL FSRI)
Page 28 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05
Photo 19 and Photo 20. This set of images was recorded between 0929 and 0930. The interval between the image on the left and the image on the right is about five seconds. These images show flames jetting upwind from a localized point under the trailer. This may be an indication of pressurized fire gases exiting an opening in the trailer. (Photos courtesy of UL FSRI) Photo 21 and Photo 22. Between 0930 and 0931, just prior to water on the fire, the image on the left shows that the flame jetting had stopped and then started again 35 seconds later. Seven seconds later the flame jet stopped again. (Photos courtesy of UL FSRI)
Page 29 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05
Photo 23, Photo 24, and Photo 25. These images are one second apart between 0932 and 0933. Dense black smoke flow from under the trailer once again is pushing out. This was seconds before the explosion. (Photos courtesy of UL FSRI) Photo 26 and Photo 27. These images provide a sense of the amount of energy released by the explosion in terms of a blast, projectiles, and thermal radiation. The image on the right shows the latched door that was blown off the trailer. (Photos courtesy of UL FSRI)
Page 30 Career Battalion Chief Dies from Explosion while Fighting Tractor Trailer Fire – Georgia Report # F2024-05
Summary The fire analysis showed it is important to recognize that ventilation limited fire conditions can occur in compartments on wheels, such as this refrigerated trailer, just as they occur in compartments in fixed structures. Fires burning inefficiently in a ventilation limited compartment can generate significant amounts of gaseous fuel. When a portion of the compartment contains an explosive mixture of oxygen and gaseous fuel, all that is needed to generate a smoke explosion is a source of heat. Based on the fire analysis of the incident there are several considerations for the fire service regarding potential fire behavior of refrigerated trailers: 1) Compartment fire dynamics apply to compartments that are part of a tractor trailer such as: the closed refrigerator trailer, tanks, and tires. 2) Watch for pulsating fire behavior indicative of the potential for a smoke explosion and maintain a safe distance.
Photo 28 and Photo 29. After the explosion, the inside of the trailer was still a fuel rich environment providing the conditions for a “vent point” ignition, as shown on the left. As additional air was entrained into the smoke the area of flaming combustion increased. The source of the fuel for the fire is mainly the trailer and not the cargo. (Photos courtesy of UL FSRI)
FD06033 | 2024_美国_NIOSH_face202406.pdf
分类:06_境外及港澳台调查报告 | 年份:2024 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
Page i
Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas Executive Summary On November 6, 2024, a 42-year- old career firefighter died, and a 38-year-old firefighter was injured while performing rapid intervention team (RIT) tasks at a vacant warehouse fire. The two firefighters were assigned to the RIT team on their arrival at the scene. At approximately 22:50 hours, the office of emergency communications (OEC) received the first call reporting a three-story warehouse on fire with an approximate location. Several additional calls reporting a warehouse on fire were received which gave a more specific address. The OEC dispatched the first alarm assignment for a warehouse fire at approximately 22:52 hours which included District Chief 20 (DC20), District Chief 8 (DC08), Engine 18 (E18), Engine 20 (E20), Engine 40 (E40), Engine 23 (E23), Tower 18 (T18), Ladder 20 (L20), and Safety Officer 30 (SF30). At approximately 22:57 hours, E18 updated responding units of a working fire. E18 arrived on-scene at approximately 22:58 hours to a “large warehouse fire showing from the roof, heavy fire” and assigned their side of the building as the Alpha side of the structure. E20 approached from the cross street and pulled past the fire building leaving room for L20. DC20 arrived and positioned across the street from the Alpha/Delta corner in a parking lot and established himself as the incident commander (IC). He reported “heavy fire from a one-story warehouse.” E18 declared a defensive fire. The OEC broadcasted an emergency tone and rebroadcasted the defensive fire message across the channel. At approximately 23:00 hours, L20A provided updated observations to IC, “Command, TIC (thermal imaging camera) reading through open doors is about 1,000 degrees at the roof, heavy smoke, fire, and F2024-06 March 2025 Photo 1: Delta side of structure post-collapse. (Courtesy of the fire department)
Page ii Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas Report # F2024-06 some of the roof is starting to collapse.” IC acknowledged the report and requested both aerial devices be set up for elevated master stream operations. IC then updated all units that accountability was in place. E40 arrived and was assigned water supply for L20. E23 arrived and IC assigned them as rapid intervention team (RIT). At approximately 23:02 hours, L20A provided a conditions, actions, needs (CAN) report stating, “Collapse of the roof, heavy fire, exposure on the Charlie/Delta side going to have to get inside, already starting to smoke up. Trying to get water on it now. L20 in position to hit it with the pipe, no further needs.” IC acknowledged the update and stated over the channel, “District 20 to all companies, do not go interior.” E23B (deceased firefighter) and E23C (injured firefighter) gathered the RIT equipment from the IC post and staged it on the Alpha/Delta corner of the fire building. IC broadcasted over the channel, “Command to all companies on Delta division, let’s stay clear of that wall, it looks like it is going to collapse outwards.” E23’s crew, as part of their RIT duties, went to the Delta side man door and began attempting to force the burglar bars and doors open to “soften” the structure. At approximately 23:05 hours, IC requested a second alarm be dispatched. As this was called, E20 updated IC there was a collapse on the Delta side. Less than a minute later, E23A declared a Mayday. IC acknowledged the Mayday. OEC also notified IC of the Mayday and inquired if IC would like the third alarm assignment. IC requested the third alarm. L20 updated IC that one person had been removed, and IC requested a count on how many personnel were missing. L20 responded possibly one more and they were going to attempt a PAR. A moment later L20 updated IC there were two firefighters missing, they were actively working to get to them and requested operations go to a different radio channel. At approximately 23:09 hours, R42 arrived and were assigned to the Delta side collapse for extrication of the trapped firefighters. IC updated OEC that the second firefighter is being extricated. At approximately 23:13 hours, L20 updated IC that all victims were out, and personnel were clearing the collapse zone. IC requested all personnel evacuate the area of the Delta side and that OEC cancel the third alarm. L20 exited the collapse zone with the second firefighter, and they needed advanced life support (ALS) to meet them at the front of L20. OEC notified IC that L20A was showing an alarm and asked for confirmation that all personnel were accounted for. IC confirmed all personnel were accounted for and requested all personnel stay away from the building and out of the collapse zone. E23C (injured firefighter) was transported to the hospital by ambulance 23. E23B (deceased firefighter) was transported to the hospital by medic 18 and was later pronounced deceased at the hospital. Contributing Factors • Pre-incident planning • Standard operating procedures/guidelines (SOPs/SOGs) • Strategy and tactics • Risk versus benefit analysis • Safety officer presence • Change of occupancy • Vacant/dangerous building inspections
Page iii Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas Report # F2024-06 Key Recommendations Fire service organizations should: • Develop pre-incident plans for structures within their first due response area, specifically dangerous or vacant structures. • Develop and maintain SOPs/SOGs. • Ensure ICs match their tactical strategy with the incident at hand. • Train all personnel to employ risk management principles when operating on the incident scene. • Strategically deploy safety officers. Additionally, governing municipalities (federal, state, regional/county, and local) should: • Complete change of occupancy inspections per applicable fire and life safety codes. • Communicate across departmental boundaries.
For further information, visit the program at www.cdc.gov/niosh/firefighters/fffipp/ or call 1-800-CDC-INFO (1-800-232-4636). The National Institute for Occupational Safety and Health (NIOSH) initiated the Fire Fighter Fatality Investigation and Prevention Program to examine deaths of firefighters in the line of duty so that fire departments, firefighters, fire service organizations, safety experts and researchers could learn from these incidents. The primary goal of these investigations is for NIOSH to make recommendations to prevent similar occurrences. These NIOSH investigations are intended to reduce or prevent future firefighter deaths and are completely separate from the rulemaking, enforcement, and inspection activities of any other federal or state agency. Under its program, NIOSH investigators interview persons with knowledge of the incident and review available records to develop a description of the conditions and circumstances leading to the deaths in order to provide a context for the agency’s recommendations. The NIOSH summary of these conditions and circumstances in its reports is not intended as a legal statement of facts. This summary, as well as the conclusions and recommendations made by NIOSH, should not be used for the purpose of litigation or the adjudication of any claim.
Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas
Page 1 F2024-06 March 2025 Introduction On November 6, 2024, a 42-year-old firefighter died, and a 38-year-old firefighter was injured while engaged in RIT tasks at a vacant warehouse fire. On November 8, 2024, the fire department notified the National Institute for Occupational Safety and Health (NIOSH) of this incident and requested an investigation. From November 19 – November 24, 2024, two investigators representing the NIOSH Fire Fighter Fatality Investigation and Prevention Program (FFFIPP) conducted interviews with fire officers and firefighters who responded to the incident. Site visits, photos taken at the scene, computer aided dispatch (CAD) notes, radio traffic audio, and surveillance camera footage were obtained from the fire department and reviewed. NIOSH investigators also reviewed the training records of specific personnel involved in the incident and reviewed the department’s SOGs and professional development model. Fire Department The career fire department in this incident consists of approximately 4,000 uniformed personnel and approximately 100 civilian personnel. Approximately 3,800 of those personnel are assigned to the emergency response division that provides fire protection and emergency medical services (EMS). The department’s emergency response division works a 72-day duty cycle. Members work a total of 480 hours that are made up of 18 regular 24-hour shifts and two 24-hour debit day shifts. The emergency response division consists of four shifts following this schedule. The shifts, not including debit shifts, typically appear on a calendar as follows: 24 hours on duty, 24 hours off duty, 24 hours on duty, 120 hours off duty. There are 93 fire stations located throughout the city that serve a population of approximately 2.3 million people across 637 square miles. The fire department divides the city into quadrants: northeast, northwest, southwest, and southeast. These are further divided into 21 districts. The fire department is certified as an Insurance Services Office class 1 department and is accredited through the Commission on Fire Accreditation International as of 2021. It provides aircraft rescue firefighting (ARFF) for two airports within the city. The fire department participates in a county wide mutual aid agreement for fire protection and suppression that was drafted in June 2017 and automatically renews every year. This agreement is across all departments within the county whether they are career, combination, or volunteer and it includes more than 71 different entities. The fire department responds to over 395,000 calls for service annually. The emergency response division is made up of two deputy chiefs, three safety officers, three cascade units, one command van, one rehab unit, 21 district chiefs, 88 engine companies, 33 ladder companies, five tower
Page 2
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas companies, 57 ambulances with an additional five during peak times, 41 medic units, five squads, seven ambulance supervisors, two senior ambulance supervisors, one EMS district chief, three rescue companies, four hazardous materials companies, and 16 ARFF units. The minimum daily staffing for the department is 849 personnel across all companies. The deputy chiefs, safety officers, cascade units, command van, ambulance supervisors, senior ambulance supervisors, EMS district chief and rehab unit are each staffed with a single person. The district chiefs, ambulances, medic units, and squads are each staffed with two personnel. Engine companies, ladder companies, tower companies, rescue companies, and hazardous materials companies are each staffed with four personnel. Ambulance units are classified as basic life support (BLS) while squads and medic units are classified as ALS. The fire department provides EMS service up to and including ALS-transport. Training and Experience The fire department hires through a civil service process. The minimum requirements to apply are that the applicant must be between 18 and no more than 36 years old when they take the oath of office, have completed 15 accredited college hours or two years of full-time active-duty military service with an honorable discharge, and have two or less moving violations in the last 36 months. Upon accepting a conditional job offer, the applicant must attend the academy and complete between eight and ten months of daily rigorous physical training and classroom instruction. Upon graduation, applicants have certifications in the Texas Commission on Fire Protection fire basic, Texas Department of State Health Services emergency medical technician (EMT) basic, and the National Registry of Emergency Medical Technicians. Once the candidate successfully graduates from the academy, they are assigned to their fire station. Once assigned to their fire station and shift, all personnel complete a minimum of 24 hours of on-the-job training and continuing education per month. Personnel within the department have a variety of career pathways they may choose to pursue once they have reached the rank of engineer operator (EO). Pursuing a career pathway involves a process of either promotion or acceptance into one of the “closed shops” within the fire department. Examples of the career pathways personnel may pursue include the OEC, inspection division, or arson division. The deceased firefighter (E23B) had eight and a half years of experience with the department. The deceased firefighter (E23B) participated in a variety of monthly company level trainings. Fire department training records show participation in training such as hazardous materials, RIT skills, building construction, multi- company drills, equipment and apparatus familiarization, EMS continuing education, area familiarization, and tactical decision making on offensive and defensive fires. Per department records, E23B firefighter routinely logged 30 hours of training per month. The injured firefighter (E23C) had approximately six years of experience with the department. The injured firefighter (E23C) participated in a variety of monthly company level trainings. Fire department training records show participation in training such as Mayday training, building construction, operational readiness,
Page 3
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas EMS continuing education, and truck company tactics. Per department records, E23C firefighter routinely logged between 24 and 30 hours of training per month. Apparatus, Personnel, and Accountability Equipment The minimum staffing for the career fire department in this incident is two personnel assigned to a district chief vehicle (district chief and incident command technician (ICT)) and four personnel assigned to engines, truck, and rescue companies. The city often must “brown out” companies due to staffing issues while maintaining a sufficient standard of cover for fire protection and EMS services. Staffing vacancies are filled with personnel working their debit day, picking up optional overtime, or being mandated to work overtime. Personnel are assigned to a specific position and apparatus by the staffing office. OEC calls are received by civilian call takers. The OEC dispatchers for the fire side of the center are sworn personnel at the rank of communications captain or above with a minimum of five years within the department. The OEC dispatchers utilize a digital trunking 700-megahertz encrypted system for all radio communications. The fire department in this incident utilized a pre-established run card assignment based on information provided by the civilian call taker. A first alarm assignment for a warehouse fire included two district chief units, four engines, two truck companies, a medic unit, and a safety officer. The three rescue companies spread throughout the city were recently added to working fires across the city. However, it was noted by the fire department that this incident type was missed in the change. The captain assigned to R42 self- dispatched their unit to this fire upon hearing E18 call the working fire. Tables 1 and 2 below provide staffing levels and location when the collapse took place. Table 1: First Alarm units at the time of collapse Resource Designation Staffing Level (#) Status and Location District Chief 20 (DC20) 2 On-scene with Command District Chief 8 (DC08) 2 On-scene with Alpha side operations Engine 18 (E18) 4 On-scene, side Alpha Engine 20 (E20) 4 On-scene, side Delta Engine 40 (E40) 4 On-scene, Alpha/Delta corner at hydrant Engine 23 (E23) 4 On-scene, RIT, side Delta Tower 18 (T18) 4 On-scene, side Alpha Ladder 20 (L20) 4 On-scene, side Delta Safety 30 (SF30) 1 Arrived after removal of second firefighter from collapse Rescue 42 (R42) 4 Self-dispatched to the incident due to recent changes in run card assignments. Arrived after
Page 4
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas the collapse, assigned to extrication of trapped firefighter Medic 40 (M40) 2 Cancelled by OEC when M18 became available and was closer to the incident. Medic 18 (M18) 3 (2 assigned, 1 intern) On-scene, requested to be added to the incident as they were available and nearby
Table 2: Second Alarm units at the time of collapse Resource Designation Staffing Level (#) Status and Location District Chief 26 (DC26) 2 Enroute. Arrived after second firefighter was extricated District Chief 19 (DC19) 2 Enroute. Arrived after second firefighter was extricated Engine 17 (E17) 4 Arrived as second firefighter was extricated Engine 25 (E25) 4 Arrived as second firefighter was extricated Engine 42 (E42) 4 Enroute. Arrived after second firefighter was extricated Engine 27 (E27) 4 Enroute. Arrived after second firefighter was extricated Ladder 7 (L7) 4 Enroute. Arrived after second firefighter was extricated Ladder 26 (L26) 4 Enroute. Arrived after second firefighter was extricated Safety 24 (SF24) 1 Enroute. Arrived after second firefighter was extricated
The fire department also has specific callsigns for each position on an apparatus. Table 3 provides the relationship between the position on the unit and the callsign. For example, L20A is the senior captain on Ladder 20. Table 3: Callsign by riding position Apparatus Type Riding Position Callsign District Chief District Chief Incident Command Technician DC#A DC#B Engine Captain Firefighter 1 Firefighter 2 E#A E#B E#C
Page 5
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas Engineer Operator E#D Tower/Ladder Senior Captain Firefighter 1 Firefighter 2 Engineer Operator T#A or L#A T#B or L#B T#C or L#C T#D or L#D Rescue Captain Firefighter 1 Firefighter 2 Engineer Operator R#A R#B R#C R#D Medic Engineer Operator Firefighter 1 Firefighter 2 (or intern) M#A M#B M#C Ambulance Engineer Operator Firefighter 1 A#A A#B Safety Officer Safety Officer Safety#
Accountability Equipment The fire department utilizes an electronic accountability system that integrates the individual firefighter’s self-contained breathing apparatus (SCBA) and portable radio and transmits information to a computer terminal in the command vehicle. The accountability, or SDI terminal, is operated by the ICT that responds with the district chief. This system provides ICs with real-time accountability of on-scene firefighters. This includes digital time stamps, fireground priority reminders, and other critical command tools for managing firefighter Mayday situations. Through multiple audio and visual alerts, SDI bridges communication gaps commonly encountered on the fireground to help ICs organize and manage incidents. The system also facilitates comprehensive handling of Mayday messages, captures radio transmissions, and identifies firefighters in distress.
Page 6
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas Personal Protective Equipment The deceased and injured firefighters were wearing their department issued personal protective equipment (PPE) ensemble. This ensemble included structural firefighting turnout gear that met the requirements of NFPA 1971, Standard on Protective Ensembles for Structural Fire Fighting and Proximity Fire Fighting [NFPA 1971 2018]. Both firefighters were wearing a NIOSH Approved® SCBA with an integrated personal alert safety system (PASS) device that were certified to the 2013 edition of NFPA 1981, Standard on Open-Circuit Self-Contained Breathing Apparatus (SCBA) for Emergency Services [NFPA 1981 2013]. Both firefighters in this incident were wearing the appropriate facepiece but were not connected to and breathing from their SCBA at the time of the collapse. NIOSH investigators examined and photographed the PPE ensemble and SCBA of each firefighter at the arson evidence office. The SCBA of E23B had signs of crush damage to the high- pressure lines near the PASS device (See Photos 2 and 3). No evidence was identified to suggest that the SCBA units contributed to the fatality or injury. Environmental Conditions The weather on November 6, 2024, at 22:50 hours was mostly cloudy. The temperature was 76°F with winds from the east-northeast at 5 mph. The Photo 2 (top) & 3 (bottom): Show damage to the high-pressure hose near the PASS device of the deceased firefighter’s SCBA. (Courtesy of NIOSH)
Page 7
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas humidity was 91% with no precipitation. At 23:50 hours, the humidity increased to 94% with no precipitation with winds from the east at 6 mph [Weather Underground 2024]. Building Construction The county central appraisal district records for the property states the vacant warehouse was 13,160 sq. ft. and built in 1955 of average quality. This total square footage included the 1,680 sq. ft. of space that was designated for two story offices. The building also had a partial partition wall between the two overhead doors on the Alpha side, closest to the Delta side. This wall did not go from floor to ceiling or from wall to wall. The building had no cooling system but contained unit heaters. The wall construction was primarily concrete block with a brick veneer on what appeared to be the office portion of the building (See Photos 1, 4, 5, and 6). The brick veneer post collapse appears to have a gap or separation between the veneer and the block wall in the post collapse images, if this space existed pre-collapse, it increases the risk of collapse. One of the six overhead style doors on the loading dock (Alpha) side of the building had a canopy roof over it. The office (Delta) side of the building had a small porch with steps on either side to a double door storefront style entrance with burglar bars over the doors. This entrance also had a canopy over it with several slots in the brick veneer toward the Alpha side of the building where it appeared that an original, larger canopy had once Photo 5: Photo showing interior details of the building and roof construction. (Courtesy of the fire department) Photo 4: Detail of Delta side wall showing the brick veneer over block wall, slots for previous canopy roof tie ins, roof surface covering. (Courtesy of the fire department)
Page 8
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas been installed. The Delta side canopy roof was constructed of dimensional lumber with a wooden veneer and topped with asphalt roofing material. The Bravo side of the building also had one overhead style door. The building had no fire protection system [HCAD 2024]. The roof construction was made of steel bar joists landed on wide flange steel beams which were supported by brick columns or smaller wide flange steel columns throughout the warehouse. The bar joists were topped with steel decking and roll style asphalt roofing material. This should be noted during departmental pre-incident planning, especially when there may be a lack of additional supports to maintain structural integrity. If the bar joists fail early into an incident, the roof and attached walls of the structure will separate.
Timeline The following timeline is a summary of events that occurred as the incident evolved. Not all incident events are included in this timeline. The times are approximate and were obtained by examining the dispatch records, audio recordings, witness statements, and other available information. All times are approximate and rounded to the closest minute. Each bullet occurred within the minute time block in the closest approximated order. The timeline is not intended, nor should it be used, as a formal record of events. Photo 6: View of the structure from the Alpha/Delta corner post collapse and during overhaul operations. (Courtesy of the fire department)
Page 9
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas Time (Hours) Fireground Operations, Response, and Details 22:50 • First call received by PSAP for a 3-story warehouse on fire. o Additional callers begin calling and giving a different location than the initial call. 22:52 • First alarm companies dispatched to a warehouse on fire at the address given by the initial call. 22:54 • First alarm assigned companies enroute to the scene. 22:56 • SF30 enroute. • Responding units given Northeast TAC 4 (NETAC 4) channel assignment for operations. 22:57 • E18 “We’ve got a column, working fire.” o OEC copies and rebroadcasts “Working fire.” o E18 repeats this message again within the minute. 22:58 • E18 arrives on scene, “Large warehouse, fire showing from roof, heavy fire, Alpha side is 66th Street.” o OEC copies message. • E20 arrives on-scene. • L20 on-scene and reports “Working fire, mobile command.” • DC20 on-scene, “Assuming command, heavy fire from a 1-story warehouse.” 22:59 • E18 declares a Defensive Fire. • OEC asks E18 to repeat. • E18 repeats, “Defensive Fire.” • OEC transmits the emergency tone and rebroadcasts, “All units, this is a Defensive Fire.” • IC orders L20 to set up the ladder pipe. • T18 also reports they are setting their ladder pipe up and opening the garage doors on the Alpha side. 23:00 • IC copies T18. • L20 – “Command, TIC reading through open doors is about 1,000 degrees at the roof, heavy smoke, fire, and some of the roof is starting to collapse. o IC acknowledges the report, requests ladder pipes be set up on Ladder 20 and Tower 18. • IC – “SDI in place.” • E40 – “On location, connecting to a plug and supplying L20.”
Page 10
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas Time (Hours) Fireground Operations, Response, and Details • E23 – “On location.” o IC – “E23, I’m going to need you to be RIT.” 23:01 • T18 – “Command, we’re going to have E18 supply T18. We’ve got a plug right behind T18. o IC copies the message. • Medic 18 requests assignment to the incident in place of Medic 40. • IC – “E40, supply L20, rear bumper.” • E20 – “Command, D side Exposure, pulling 1.75” to protect it, we don’t have a supply.” o IC copied the message. • E23 crew gets RIT equipment from DC20’s vehicle. 23:02 • E18 establishes their water supply. • E40 acknowledges their assignment, asks if they are RIT after water supply. o IC – “E23 is RIT.” • L20 – “We’re set up for water.” • L20A – “Ready to give CAN report.” 23:03 • IC – “L20, Go ahead.” o L20A – “Collapse of the roof, heavy fire, exposure on C/D side going to have to get inside, already starting to smoke up. Trying to get water on it right now. L20 in position to hit it with the pipe, no further needs.” o IC – “Received, District 20 to all companies, do not go interior.” • E20 requests personnel to assist with dragging supply line to a nearby hydrant. o IC assigns this task to Medic 18. • E23 crew stages RIT equipment at Alpha/Delta corner of building. 23:04 • IC requests status of water supply. • E18C – “Water’s coming.” • IC updates OEC that water supply is established to both ladder pipes. • IC – “Command to all companies on Delta Division, let’s stay clear of that wall, it looks like it’s going to collapse outwards.” • District 8 on location. o IC assigns District 8 side Alpha. • E23B and E23C walk up to Delta side porch to “soften” the structure. 23:05 • IC requests 2nd alarm dispatched. o OEC copies request for 2nd alarm.
Page 11
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas Time (Hours) Fireground Operations, Response, and Details • E20 – “Command, we got a collapse on the Delta side.” o IC – “That’s received. Command to all companies, stay away from Delta Division.” • E23B’s radio changes to the wrong channel. E23B’s SCBA pressure is noted as having dropped approximately 650psi since arrival on-scene. 23:06 • E23A declares Mayday. o IC – “We have a positive Mayday.” o OEC – “Command you had a mayday, possibly L20D.” o IC – “Received, yes, positive Mayday, we’re working on getting him out right now.” o OEC – “Command, I just sent your 2nd alarm, do you want the 3rd alarm for your Mayday?” o IC – “Yes, give me that 3rd alarm.” • E23B’s SCBA shows another approximately 600psi drop. SCBA also showing in full alarm. 23:07 • ICT sends an electronic PAR check over the radio to E23B. E23B’s SCBA pressure drops another approximately 1200psi. • L20 – Updates IC that one person was removed. o IC copies, inquires about total missing personnel. o L20 states they think one more, going to get a PAR. • E1 arrives. o IC requests they report to IC Post. • E40 – Updates they have one more person trapped under debris. 23:08 • E23B’s SCBA pressure drops approximately 450psi. SDI showed the remaining pressure at 0psi. • L20 advises IC there are two firefighters missing, they are actively working, requests operations go to a different channel and the rescue stay on this channel. o IC copies. 23:09 • Rescue 42 arrives. o IC assigns Rescue 42 to the Delta side for extrication of trapped firefighter. 23:10 • IC inquires if there is another firefighter missing. 23:11 • Tower 18 requests water. • OEC calls IC with 10-minute incident clock and advises L20A is showing in alarm.
Page 12
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas Time (Hours) Fireground Operations, Response, and Details o IC requests L20 PAR report, other personnel answer he is OK, working the rescue. • Alpha division requests additional medic units from IC. • E23B’s PASS alarm shows cleared in electronic accountability system. 23:12 • IC requests two medic units added to the incident. • Tower 18 updates they have water flowing on Alpha side of building. • IC advised the second firefighter is being extricated. 23:13 • L20 updates all victims are out, all personnel clearing the collapse zone. • IC requests all personnel evacuate the area of Delta side. • IC requests OEC cancel the 3rd alarm. • Engine 25 and Engine 17 arrive. • L20 updates they are exiting the collapse zone with the 2nd victim. They need ALS, automated external defibrillator (AED) protocol is in effect. 23:14 • IC asks all units to clear Delta side. • OEC cancels 3rd alarm. • L20 requests to ALS meet them at front of L20. • IC orders Medic 17 to Delta side. 23:15 • DC 26 and DC 46 arrive. • L20 requests ALS a third time. • IC orders E18 and T18 to stay back from the wall on the Alpha Division, L20 is about to start flowing in that area. • SF30 arrives. 23:16 • Engine 42 arrives. • T18 reports bulk of the fire is knocked on the Alpha side. Asks if IC wants the stream redirected. • OEC notifies IC that L20A is showing in alarm. Asks for confirmation that all personnel are accounted for. 23:17 • IC confirms all personnel are accounted for. • IC requests all personnel stay away from the building. • E27, Medic 40, L26 arrive on-scene. 23:18 • L20 updates all wounded are out and everyone is outside the collapse zone. • OEC updates IC they are at the 20-minute incident clock. 23:44 • IC declares the incident under control.
Page 13
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas
Investigation On November 6, 2024, at approximately 22:50 hours, a 9-1-1 call was received by the OEC for a three-story warehouse on fire with an approximate location. As the first call was being handled by civilian call takers, additional calls were being answered for the incident of a warehouse on fire near the location provided by the initial call. As the call taker began entering information into the CAD terminal, the first alarm suggested units populated. The OEC personnel dispatched the suggested units to the area the first caller provided the call taker. The dispatched units included DC20, DC08, E18, E20, E40, E23, T18, L20, and SF30. Within four minutes of the initial call, all first alarm units were enroute to the incident location. OEC assigned this incident NETAC4 for operations. At approximately 22:57 hours, E18 updated “We’ve got a column, working fire.” OEC copied the update and rebroadcasted the working fire. At approximately 22:58 hours, E18 arrived on-scene and sized the incident up as, “Large warehouse, fire showing from the roof, heavy fire, Alpha side is 66th street.” OEC copied the message. E20 approached from the cross street (i.e., Delta side) within seconds of E18’s size up. L20 arrived and positioned behind E20 on the Alpha/Delta corner (See Photo 7) and reported, “Working fire, mobile command.” Seconds later DC20 arrived and updated, “Assuming command, heavy fire from a one-story warehouse.” Time (Hours) Fireground Operations, Response, and Details 23:53 • E23B transported by Medic 18 to a nearby hospital. • E23C transported by Ambulance 23 to a nearby hospital.
Page 14
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas At approximately 22:59 hours, E18 broadcasted this incident as a defensive fire. OEC asked E18 to repeat their last message. E18 repeated, “Defensive fire.” OEC transmitted an emergency tone and rebroadcasted “All units, this is a defensive fire.” IC ordered L20 to set up their ladder pipe. T18 reported setting up their ladder pipe up and opening garage doors on the Alpha side. IC copied the report from T18. At approximately 23:00 hours, L20A radioed IC, “Command, TIC reading through open doors is about 1,000 degrees at the roof, heavy smoke, fire, and some of the roof is starting to collapse.” IC acknowledged the report and requested the ladder pipes on T18 and L20 be set up. IC updated all units that SDI was in place. E40 arrived and advised IC, “On location, connecting to a plug and supplying L20.” E23 arrived and IC assigned them RIT responsibilities. At approximately 23:01 hours, T18 updated, “Command, we’re going to have E18 supply T18. We’ve got a plug right behind T18.” IC acknowledged the message. Medic 18 requested to be added to the incident instead of Medic 40. IC ordered E40 to supply L20 through the rear bumper. E20 updated, “Command, D side exposure, pulling 1¾ to protect it, we don’t have a supply.” IC acknowledged the update. E23 crew went to DC20’s vehicle and retrieved the RIT equipment for their assignment. E18 established their water supply. E40 acknowledged their assignment and asked if they were to be RIT after establishing a water supply. IC advised E23 is RIT. L20 advised they were setup for water. L20A called IC and was ready to give a CAN report. Photo 7: Arrival conditions of L20 at the Alpha/Delta corner. (Courtesy of the fire department)
Page 15
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas At approximately 23:02 hours, IC was ready for the CAN report. L20A stated, “Collapse of the roof, heavy fire, exposure on C/D side going to have to get inside, already starting to smoke up. Trying to get water on it right now. L20 in position to hit it with the pipe, no further needs.” IC responded, “Received, District 20 to all companies, do not go interior.” E20 requests personnel to assist with dragging a supply line to a nearby hydrant. IC assigned the crew of Medic 18 to assist. E23 staged the RIT equipment on the ground near the Alpha/Delta corner of the building. At approximately 23:04 hours, IC requested the status of the water supply to which E18C responded, “Water’s coming.” IC updated OEC that a water supply was established to both ladder pipes. DC08 arrived as IC updated all companies on scene, “Command to all companies on Delta Division, let’s stay clear of that wall, it looks like it’s going to collapse outwards.” IC assigned DC08 to side Alpha. E23B and E23C walked up onto the Delta side porch to “soften” the building as part of the RIT assignment. At approximately 23:05 hours, IC requested the 2nd alarm be dispatched. E20 called IC, “Command we got a collapse on the Delta side” (See Diagram 1). IC responded, “That’s received. IC to all companies, stay away from Delta Division.” The ICT noticed that E23B’s radio suddenly changed to the wrong channel for the incident and that their SCBA pressure dropped approximately 650 psi since their arrival on scene. At approximately 23:06 hours, E23A declared a Mayday. IC acknowledged the mayday. OEC called IC, “Command you had a Mayday, possibly L20D.” IC confirmed the message, “we’re working on getting him out right now.” OEC confirmed to IC the 2nd alarm was dispatched and asked if IC wanted the 3rd alarm for the Mayday. IC asked for the 3rd alarm. E23B’s SCBA showed approximately 600psi more drop as well as the PASS showing it was in full alarm. At approximately 23:07 hours, L20 updated IC that one firefighter had been removed. The ICT sent an electronic PAR check over the radio to E23B. E23B’s SCBA pressure dropped an additional 1,200 psi. IC asked how many personnel were missing. L20 thought one more and went to get a PAR. E1 arrived and was ordered to report to the IC post. E40 updated that they had one more person trapped under debris. A moment
Page 16
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas later L20 advised IC there were two firefighters missing and actively working to get them. L20 requested operations go to a different radio channel so the rescue could have this one. E23B’s SCBA pressure dropped an additional 450 psi and the electronic accountability system in use by the department showed there was 0psi remaining in the SCBA. Diagram 1: Scene layout from above at time of collapse. (Prepared by NIOSH)
Page 17
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas At approximately 23:09 hours, R42 arrived and assigned to the Delta side for extrication of the trapped firefighter. IC asked if there was another firefighter missing. At approximately 23:11 hours, T18 requested water. OEC updated IC they were at the 10-minute incident clock and advised L20A was showing in alarm. IC requested a PAR for L20, other personnel respond he was ok and working the rescue. T18 updated they had water flowing on Alpha side of the building. IC updated the second firefighter was being extricated. E23B’s SCBA PASS alarm showed cleared in the electronic accountability system as well. At approximately 23:13 hours, L20 updated all victims and personnel clearing the collapse zone were out. IC requested all personnel evacuate the area of the Delta side and that OEC cancel the 3rd alarm. L20 exited the collapse zone with the second victim, and they needed ALS and AED protocols in effect. IC again asked all units to clear from the Delta side. L20 requested ALS meet them at the front of L20. IC ordered Medic 17 to Delta side. At approximately 23:15 hours, L20 requested ALS a third time. IC ordered E18 and T18 to stay back from the wall on the Alpha division, L20 to be flowing water in that area. SF30 arrived on location. At approximately 23:16 hours, T18 reported the bulk of the fire was knocked down on the Alpha side and asked if IC wanted the stream redirected. OEC notified IC that L20A was showing in alarm and asked for confirmation that all personnel were accounted for. IC confirmed that all personnel were accounted for and requested all personnel stay away from the building. At approximately 23:18 hours, L20 updated that all wounded personnel were out, and everyone was outside of the collapse zone. EOC updated IC they were at the 20-minute incident clock. E23C was transported to the hospital by Ambulance 23 and treated for minor injuries. E23B was transported to the hospital by medic 18 and was later pronounced deceased at the hospital. IC declared the fire under control at 23:44 and the scene was turned over to the arson division. Fire Origin and Cause The cause of the fire was incendiary/arson. Cause of Death The cause of death listed in the county medical examiner’s report is mechanical asphyxia with the manner of death being listed as homicide. Contributing Factors Occupational injuries and fatalities are often the result of one or more contributing factors or key events in a larger sequence of events that ultimately result in injuries or fatalities. NIOSH investigators identified the following items as key contributing factors in this incident: • Pre-incident planning • SOPs/SOGs • Strategy and tactics
Page 18
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas • Risk versus benefit analysis • Safety officer presence • Change of occupancy • Vacant/dangerous building inspections Recommendations Fire service organizations should: Recommendation #1: Develop pre-incident plans for structures within their first due response area, specifically dangerous or vacant structures. The fire department in this incident has a section dedicated to the authority having jurisdiction’s (AHJ) approved fire code compliance for several adopted International Code Council (ICC) fire codes: • 2021 International Fire Code (IFC) with specific amendments for application within the city. • 2021 International Building Code • 2021 International Existing Building Code (IEBC) • 2021 International Residential Code • 2021 International Swimming Pool and Spa Code • 2021 International Energy Conservation Code • 2021 Uniform Mechanical Code • 2021 Uniform Plumbing Code • 2023 National Electric Code with all applicable amendments The city handles vacant and dangerous building inspections and the associated responsibilities. The city provides a hotline for residents and visitors to report concerns. Tips received from the hotline are transferred to the appropriate entity within the city for follow up and any needed actions. Residential building concerns fall within the department of neighborhoods, inspection, and public services. Commercial building concerns fall within the responsibility of public works inspection and investigation division. These entities are entirely separate from the fire department’s fire marshal office. In this incident, the fire building was not occupied by an active business. The property had employed an individual to occupy the building as a form of security but there was no formal security in place. The individual was permitted by the building owner to live within the confines of the warehouse while it was in this unoccupied or vacant state. Chapter 3 of NFPA 1660, Standard for Emergency, Continuity, and Crisis Management: Preparedness, Response, and Recovery, defines a vacant building as a building that is currently unoccupied or unused and for which there is intention to reoccupy and reuse in the future [NFPA 1660 2024]. Section 311.1 General of the 2021 IFC specifies that temporarily unoccupied buildings, structures, premises, or portions thereof, including tenant spaces, shall be safeguarded and maintained in
Page 19
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas accordance with sections 311.1.1 through 311.6Section 311.2.1 Security of the 2021 IFC states that exterior and interior openings that are open to other tenants or unauthorized persons shall be boarded, locked, blocked, or otherwise protected to prevent entry by unauthorized individuals [International Code Council 2021]. City code of ordinances, Article 9, Division 5 for dangerous buildings lists several ways the city classifies a dangerous building including: a vacant building, regardless of its structural condition, that has been unsecured for more than seven consecutive/inconsecutive days in any 30-day period [Municode 2024]. The vacant property in this incident was known to the city public works department and had recently undergone several rounds of exterior inspections. The structure had been occupied as recently as one month prior to this incident. Although the inspections had multiple failures, none of them qualified the building as dangerous; however, it was noted that all the inspections conducted through this process were only from the exterior of the building. Interior inspection of vacant properties can only be conducted using an administrative warrant unless personnel are invited in by the property owner. Several of the line personnel interviewed by NIOSH investigators felt more communication regarding building inspections would be beneficial. It was noted during the field visit that the department recently began performing pre-incident plans for structures by emergency response personnel within the city. This was based on a risk assessment point total that fell within the range of High (36-42 points) or Special (43-49 points), requiring a pre-fire plan be performed. Appendix A shows the building’s risk assessment and classifications provided by the department as well as their assigned point values for each. Chapter 17 of NFPA 1660 states that pre-incident plans will assist personnel in effectively managing incidents and events for the protection of occupants, responding personnel, property, and the environment [NFPA 1660 2024]. Because many fire departments are unable to develop a pre-incident plan for all the structures within their jurisdiction, departments may opt to prioritize plans for structures that have 1.) elevated or unusual fire hazards, and 2.) life safety considerations [NIOSH 2024]. The information gathered and included in the pre-incident plan can help ensure the appropriate tactics are employed in the most effective way. Chapter 17 of NFPA 1660 (2024) indicates that the pre-incident plan should be a cooperative effort among the plan developer, facility management and operations staff, and responding personnel. Further, the plan should be coordinated with the incident management system (IMS). A key component to the pre-incident planning process is the provision for training and education for portions that involve unique or unusual operations. Pre-incident plans should also be available to the IC while operating at an incident. When developing pre-incident plans, items to consider include [NFPA 1660 2024]: • Potential life safety hazard, including emergency responder safety • Structure size and operations complexity • Economic impact • Importance to the community
Page 20
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas • Location and seasonal variations • Presence of hazardous materials • Susceptibility to natural disasters When developing a pre-incident plan the developer should [NFPA 1660 2024]: • Visit the property to become familiar with its layout, contents, construction, and protection features. • Use a standardized pre incident plan document which is utilized throughout the AHJ response area. Chapter 18 of NFPA 1660 states that pre-incident plan physical elements and site considerations should be classified into five groups [NFPA 1660 2024]:
- Construction
- Building management systems and utilities
- External site conditions
- Internal and external security
- Fences or other barriers
Section 18.2 of NFPA 1660 discusses the construction of the building and what should be included in the pre-incident plan such as the size of the building in its entirety (i.e., the overall height, number of stories, square footage, and exact or approximate year of construction. Within the construction section of the pre- incident plan, including data on various points of construction may be helpful such as [NFPA 1660 2024]: • Wall construction, insulation, and integrity • Roof construction and integrity • Floor construction and integrity • Pertinent building features • Floor plan with room identifier, occupancy, and use of each room • Location, types, and construction of access features • Areas where fire, products of combustion, or other contaminants could spread due to a lack of structural barriers • Atriums • Storage arrangements • Fire command center location, access, and fire rating of the area fire walls Performing a pre-incident plan and recording the data allows the personnel responding to that structure to get inside and around the building before there is an emergency incident. This allows the personnel a basic familiarity with the location prior to the introduction added stressors during an emergency response. The 2021 IEBC allows the city to perform an inspection whenever a change of occupancy occurs within a structure. A change of occupancy is defined as [ICC 2021]:
Page 21
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas • any change in the occupancy classification of a building or structure • any change in the purpose of, or a change in the level of activity within, a building or structure • change of use This code provides an opportunity for the city to perform an inspection and pre-incident plan anytime a building changes owners or tenants to ensure awareness of hazards on the premises. While performing change of use and change of occupancy inspections, AHJ’s and fire departments could help make buildings safer by ensuring compliance to codes and standards. It is imperative to the safety of personnel that the fire department and the AHJ are operating from the same edition of codes so there are not discrepancies in enforcement. The fire department in this incident is currently in process of formally implementing pre- incident plans in emergency response. Recommendation #2: Develop and maintain SOPs/SOGs. The fire department in this incident provided their SOGs to NIOSH investigators for review. The department has well-defined guidelines that provide a reference framework for personnel to use when they respond to incidents. The fire department also provides tracking on each document for when they are reviewed or revised with a date. In the fire service, SOPs/SOGs exist to give personnel a basis to make split second decisions effectively and safely. If constructed well, operating personnel may not need to deviate from the written guidelines or policies. SOPs/SOGs allow fire departments to approach operational risk management in a standard manner that will include a full range of safety considerations [U.S. Fire Administration 2018]. Incorporating SOPs/SOGs in all facets of operations and training allows personnel to execute safety considerations as part of the IAP. NFPA 1550, Standard for Emergency Responder Health and Safety, Chapter 6 outlines that fire departments should prepare and maintain written policies and SOPs that document the organization structure, membership, roles and responsibilities, expected functions, emergency operations, and training requirements including the procedures that will be employed to initiate and manage operations at the scene of an emergency incident. NFPA 1550 also states that fire departments evaluate current trends and research annually or following a near miss or catastrophic event to determine if policies and procedures are appropriate [NFPA 1550 2024]. Department guidelines had many segments that had not been reviewed in two or more years with many not having revisions in four or more years prior to the date of this incident. Recommendation #3: Ensure ICs match their tactical strategy with the incident at hand. In this incident, the fire department was dispatched to a working fire at a vacant warehouse. Moments after arrival, E18 declared a defensive strategy for operations. Each portion of the building type for this incident has its own set of tactical considerations to consider. Chapter 12 of NFPA 1700 provides specific tactical
Page 22
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas considerations for each of these building types. Section 12.13 is specific to abandoned and vacant structures, while section 12.15 is specific for warehouses. Abandoned or vacant structures are those no longer in use and could be in an unknown condition or compromised state (e.g., weakened structural components, missing or holes in the floors, and/or structural deficiencies). When operating at these types of structures [NFPA 1700 2021]: • Consider exterior fire control prior to entry. • Anticipate early collapse. • Anticipate unpredictable or increased fire activity or impediments to normal firefighting operations based on gutted, deteriorated, and modified interiors. • Consider occupancy by squatters and transients. Warehouse and storage fires may be complex incidents that can expose responders to varying challenges and hazards. The complexity of these incidents is a function of several factors and can require significant resources to mitigate. Fires in these types of occupancies can involve large open areas and high fuel loads. Key risk factors for warehouse fires include [NFPA 1700 2021]: • Construction features including construction type, total building size, details of fire-rated enclosures, and the presence of large open fire areas • Types and hazard level of material stored • Storage configurations such as height and type (e.g., rack storage, floor storage) • Presence, type, and suitability of fire protection and detection systems. • Available methods to facilitate ventilation such as roof vents, smoke control, and exhaust systems • Availability and adequacy of water supply • Equipment and machines that involve material handling Section 12.15.2 of NFPA 1700 states that preplanning of warehouse and storage occupancies is a critical aspect of enabling an effective fire response. Section 12.15.5 of NFPA 1700 discusses how high fuel loads and long structural spans can facilitate structural collapse, suggesting that structural conditions be continually evaluated. A common denominator in both vacant fire building and warehouse fire building tactics is an increased risk of structural collapse. For large fires where the fire has vented through the roof, defensive operations should be initiated. Specifically, personnel should be evacuated from within the interior while roof areas and appropriate collapse zones are established and enforced. Aerial water streams and ground-level monitors can be used to help control the spread of fire and protect against exposures [NFPA 1700 2021]. The construction of a building can also help the IC identify an appropriate tactical strategy. The fire building in this incident was Type II construction consisting of approximately 13,160 square feet with 1,680 sq. ft. of the building designated as office space. The building contained no means of automatic fire suppression. The
Page 23
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas roof was constructed of lightweight trusses topped with metal decking and asphalt roofing material. There was also no noted fire detection system. This combination allowed the fire to free burn until a passerby called to report the fire. The building also had burglar bars on the windows and a storefront style door on the Delta side. Type II construction is split into two categories, Type II-A (protected) and Type II-B (unprotected). Type II- A requires that structural components have one-hour fire resistance, meaning the building will perform similarly to Type I but with a lower requirement for fire resistance. Type II-B allows structural components to remain unprotected, meaning major structural components have no fire resistance. A Type II-B building cannot be expected to provide structural stability under fire conditions and the failure of unprotected steel members must be anticipated. Chapter 2 of the Essentials of Fire Fighting 8th Edition Firefighter 2 discusses that when Type II construction is exposed to temperatures above 1,000°F, unprotected steel will expand and twist, pushing out walls [IFSTA 2016]. RIT operations can be separated into a few stages depending upon the scale of the incident and tactical strategy employed. The collapse of the Delta side wall occurred while the personnel assigned to E23 were in process of working through what can be described as stage one. In the article The Fire Scene: The Three Stages of RIT Operations, stage one is described as the prevention stage (Salka Jr., 2024), meaning the RIT team members assemble and place RIT tools in a staging area. Oftentimes ladders are positioned around the structure for rapid escape if conditions dictate the need. Another prevention duty of the RIT team is “softening the building” or the removal of window bars or other barriers that could prevent a firefighter retreating out through a window or door. These actions all take time to complete, and the RIT team operations may benefit from having these actions performed before the RIT team is deployed in a rescue situation [Salka Jr. 2024]. Recommendation #4: Train all personnel to employ risk management principles when operating on the incident scene. There were decisions made early into this incident that did not employ appropriate risk management principles. E18, within moments of arrival, declared this is a defensive fire over NETAC4, which was acknowledged by IC and rebroadcast by OEC with alert tones. L20A arrived within seconds of E18, performed a 360 of the structure and provided the findings to IC as well as a CAN report for effective containment of the fire. The CAN report informed the IC that the temperatures at the ceiling of the building were 1,000°F and portions of the roof collapsed. Since the early 1990s, the fire service has operated under the mantra of “Risk a lot to save a lot, risk a little to save a little” [Avsec 2023]. Performing an offensive fire attack from inside a structure increases the inherent risk to the personnel performing the attack, whereas a defensive posture may provide an added level of safety by keeping personnel outside the structure. Fire departments should provide personnel with a standardized risk management approach that could be employed at any incident [NIOSH 2020]. Personnel
Page 24
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas operating at an incident should be cognizant of the safety of themselves and their crew to maintain maximum effectiveness. Chapter 10 Incident Management of NFPA 1550 includes a section on risk management during emergency operations and while it specifically mentions the IC to include risk management in the IAP, the same could be applied to all personnel. Risk management principles should be utilized based on the following [NFPA 1550 2024]:
- Activities that present a significant risk to personnel safety should be limited to situations where
there is a potential to save endangered lives.
- Activities that are routinely employed to protect property are recognized as inherent risks to the
safety of personnel, and actions are taken to reduce or avoid these risks.
- No risk to the safety of personnel is acceptable when there is no possibility to save lives or property.
- Where the risk to fire department personnel is excessive, activities are limited to defensive
operations. Initiative 3 of the 16 firefighter life safety initiatives from the Everyone Goes Home project suggests that personnel focus greater attention on integrating risk management principles with incident management at all levels, including strategic, tactical, and planning responsibilities. This integration allows for appropriate risk management at all levels of operations from the newest to most experienced firefighter. Initiative 4, empowerment, states that all firefighters be empowered to stop unsafe practices [Everyone Goes Home 2025]. Annex J, Risk Management Plan Factors, of NFPA 1550 provides information on developing a risk management plan and includes a sample that fire departments could implement as a framework and then fine tune for their situation. The steps outlined in Annex J, per NFPA 1550 [2024] are:
- Risk identification: Looking at every aspect of the fire department’s operation and listing potential
problems
- Risk evaluation: Evaluating each risk identified in step one and determining the likelihood and
potential severity (e.g., expense) of the occurrence.
- Establishing priorities for action: Evaluating the frequency and severity of risks guides how
departments establish priorities. A risk evaluated to be a low probability, but high severity often ranks as a high-priority item [NFPA 1550 2024]. Risks that have a lower likelihood can often be placed lower on the priority list.
- Risk control: Once risks are identified and evaluated, a control for each should be implemented and
documented with one of two primary methods – 1.) Eliminate or avoid the risk or activity that presents the risk, or 2.) Develop steps to control the level of the risk.
- Other control methods: Other suggested methods of controlling risk include developing,
implementing, and enforcing a safety program, developing SOPs/SOGs disseminating training, and completing inspections.
Page 25
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas Recommendation #5: Strategically deploy safety officers. The fire department in this incident had three personnel on each shift assigned to the position of safety officer for the entirety of the city. That equates to one safety officer for every 31 firehouses on average. Fire departments may find added benefits, such as response time, if they increase the number of personnel trained to perform the duties of a safety officer. With the safety officer position operating as a separate but incorporated part of the IC staff who looks for hazards and works with personnel, they may provide a separate, individual focus on the safety aspects of the incident. In other words, they are not assigned operational tasks but are solely focused on the safety of the personnel on scene and changing conditions separate from the IC and their plan. Mayday declarations within career fire departments oftentimes occur within 20 to 35 minutes of the initial on scene time according to the 2021 Project Mayday report. Of 12,227 declared Maydays, approximately 6,352 or 51.95% were within this window of on scene time. In this incident, the Mayday occurred within seven minutes of the arrival of the first unit, putting this incident within the lowest frequency of occurrences. Only 0.5% of Maydays included within the sample set occurred in less than 10 minutes of the first arriving unit [Abbott 2021]. It is also known that a high percentage of Mayday declarations occur when only one chief officer is on scene, as high as 90% in 2019 [Marsar 2019]. This incident occurred approximately one minute after the arrival of the second district chief and ten minutes before the arrival of the assigned safety officer. The incident safety officer (ISO) is responsible for identifying activities that pose an imminent threat to firefighter safety and subsequently stop, alter, or suspend the identified activity. When an ISO identifies unsafe conditions, operations, or hazards that do not pose an imminent threat to firefighters, they should take appropriate action through the IC to mitigate or eliminate the unsafe condition. Upon arrival to the scene, the ISO should conduct a quick, face-to-face with the IC if possible, to cover the scene layout, established perimeters or control zones, initial hazards, and the strategies and tactics employed in the IAP by the IC. ISOs should perform their own, independent 360 of the scene focused on personnel safety rather than for tactical reasons [Eskwitt 2018]. Fire departments may benefit if the deployment of safety officers occurs as part of the initial assignment to any incident where personnel could be assigned tasks within an immediately dangerous to life and health (IDLH) atmosphere such as a fire, hazardous materials incident, or technical rescue. Across the fire service it is common for the first arriving officer to establish command as the IC and subsequently pass command to the first arriving chief officer for the remainder of the incident. However, there are many times in which the second arriving command officer is tasked to operations or a division of the incident. Fire departments could see significant benefit to the safety of their personnel by assigning the second arriving command officer as the ISO and altering the assignments for high-risk incident types to include three command officers on the initial assignment. This would allow for the first arriving officer to assume command, the second arriving officer to assume the ISO role, and the third officer to be tasked according to the IAP based on their arrival.
Page 26
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas The third officer could be assigned what has been traditionally assigned to the second arriving officer. This change would allow for personnel safety to be elevated on the hierarchy of the IAP.
Additionally, governing municipalities (federal, state, regional/county, and local) should:
Recommendation #6: Complete change of occupancy inspections per applicable fire and life safety codes. The building was vacant as the previous occupant relocated operations. The lack of a building occupant falls under the adopted codes as being classified as a “dangerous building with unlawful existence.” The public works department performed building inspections at this location prior to the incident but could only do so from the exterior as the building was secured. The AHJ could benefit from adding an additional process to notify various departments, including the fire department, when buildings in their respective territories are added to the dangerous or vacant building list. When the AHJ is notified of a change in occupancy, they could enact a joint inspection between fire department personnel as well as other municipal departments to allow for faster and clearer hazard communication across traditional departmental borders. Because tenants utilize structures for different purposes, when tenants of commercial buildings change, so can the fire load and hazards inherent to the building. It could go from dry good storage, hazardous material storage, to medical supplies, or just about anything else the building owner chooses to allow. NFPA 1, Fire Code, Chapter 1, Section 1.3, states that this code applies to new and existing conditions and more specifically in repairs, renovations, alterations, reconstruction, change of occupancy, and additions to buildings and requires conformity. Further, NFPA 1 states plans for a new occupancy be submitted to the AHJ prior to the change of occupancy of any existing building. NFPA 1 also requires that plans be submitted for review by the AHJ prior to altering the means of egress or fire protection systems of any existing building [NFPA 1 2024]. The issuance of an occupancy permit following a request for a change of occupancy within a structure should be dependent on satisfactorily following all applicable codes and variances adopted and enforced by the AHJ. NFPA 1, chapter 4, states that in any building or structure, a change from one occupancy classification to another shall be permitted only where the space conforms with code and variance requirements that apply to new construction for the proposed new use, except the following [NFPA 1 2024]:
- Where, in the opinion of the AHJ, the proposed occupancy or change in use is not more hazardous
than the existing use, based on life safety and fire risk, the AHJ shall be permitted to approve such a change of occupancy provided compliance with the requirements of the adopted code for buildings of like occupancy or use are specifically incorporated to safeguard the life, health, and welfare of persons.
Page 27
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas
- Change of tenants or ownership shall not be construed to be a change of occupancy classification
where the nature of use and assigned occupancy classification remain the same. However, the ability to make these requirements more stringent lie with the AHJ. Specifically, the AHJ can require any change of occupancy request to be approved prior to the action taking place and enforce notification of any change of occupancy occurring. The 2021 IFC defines a change of occupancy as any time the code requires a greater degree of safety, accessibility, structural strength, fire protection, means of egress, ventilation, or sanitation than exists in the current building or structure such as a change in occupancy classification, or the purpose of or level of activity within a building [ICC 2021]. To ensure compliance prior to normal business operations, the AHJ could adopt a process that includes a site inspection for code compliance and incorporates a pre-fire plan as part of the process. Incorporating a pre- incident planning component into this process could allow responding personnel to be updated on any changes with the contents, occupied hours, and any fire protection changes to the structure. This process could also allow the responding personnel a tactical and safety advantage prior to arriving on scene by having at least a basic understanding of what they may be responding to. Recommendation #7: Communicate across departmental boundaries. Cross-departmental communication can ensure the disbursement of information and improve personnel safety within local government. This includes communication to other parts of the local government as well as the residents and visitors of the municipality. Communications is of the utmost importance for local governments and the complexity of disbursement continues to increase as society becomes more technology driven. Local government provides essential services, enforces regulations, and makes decisions that impact the lives of those residing, working, and visiting their communities every day and the information related to these items need to be disseminated to everyone within the community regardless of their abilities or backgrounds [Pond 2023]. Communication across departments can also support community engagement and legal obligations. While it is imperative that local government entities ensure communication from the outward facing perspective, it is just as important to foster communication internally among departments. The local government where this incident occurred had multiple entities that had various aspects of code compliance and building complaints within the municipality. None of these entities had a process for communicating with other entities that may be involved. Creating a procedure for cross-departmental communication could help identify potential hazards in various occupancies. The building in this incident was originally reported as a potentially dangerous building but only one segment of the local government was aware of that.
Page 28
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas Another form of cross-department communication that agencies may find useful are visuals. As an example, marking the building on the exterior could provide a visual indicator for arriving responders that the building may need to be approached with different tactics. This could provide the IC with a visual indicator and reminder to set up operational perimeters and collapse zones earlier into the incident, potentially from the first arriving company onward. This type of system, sometimes referred to as a High-Risk Building Management Program (HRBMP) addresses the needs associated with hazard communication for these types of structures [NIOSH 2022]. An HRBMP consists of three phases, a determination, remediation, and emergency response. The remediation phase consists of two parts, demolition and marking. For buildings that fall within an HRBMP, remediation can involve clear communication and signage. The International Association of Arson Investigators (IAAI) and the United States Fire Administration (USFA) have developed an abandoned building project that depicts specific signage to be affixed to these types of buildings as seen in Diagram 2. However, this is just one example. It is likely that local government agencies have their own programs and systems for communicating such information. References Abbott, D. E. (2021). Project Mayday. Retrieved January 2025, from http://www.firefightermayday.org/: http://www.firefightermayday.org/public/res/pdf/PM_COIC_Part_1.pdf Avsec, R. (2023, March 8th). "Risk a little to save a lot": A new look at an old mantra. Retrieved January 2025, from FireRescue1: https://www.firerescue1.com/fire-products/personal-protective-equipment- ppe/articles/risk-a-little-to-save-a-lot-a-new-look-at-an-old-mantra-glmhuy2ZKFxVw62c/ Eskwitt, S. (2018, September 12). First 5 Minutes on the Fireground: Critical Actions for Incident Safety Officers. Retrieved January 2025, from Lexipol: https://www.lexipol.com/resources/blog/first-5- minutes-on-the-fireground-critical-actions-for-incident-safety-officers/ Everyone Goes Home. (2025). 3. Risk Management. Retrieved January 2025, from https://everyonegoeshome.com: https://everyonegoeshome.com/16-initiatives/3-risk-management/ Everyone Goes Home. (2025). 4. Empowerment. Retrieved January 2025, from https://everyonegoeshome.com: https://everyonegoeshome.com/16-initiatives/4-empowerment/ Diagram 2: IAAI/USFA high-risk building marking system (Courtesy of USFA)
Page 29
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas Harris Central Appraisal District. (2024). Real Property Records. Retrieved December 2024, from hcad.org: https://hcad.org/property-search/real-property/real-property-search-by-address International Code Council. (2021). 2021 International Existing Building Code. Country Club Hills, IL, United States of America. Retrieved January 2025 International Code Council. (2021). 2021 International Fire Code (IFC). Country Club Hills, IL, United States of America. Retrieved December 2024 International Fire Service Training Association. (2016). Building Construction Related to the Fire Service (4th ed.). (O. S. University, Ed.) Stillwater, Oklahoma, United States of America: Fire Protection Publications. Retrieved January 2025 International Fire Service Training Association. (2024). Essentials of Fire Fighting Firefighter 2 (8th ed.). (O. S. University, Ed.) Stillwater, Oklahoma, United States of America: Fire Protection Publications. Retrieved January 2025 Marsar, S. (2019, June 1). Your First Mayday Shouldn't be the Real Thing! Retrieved January 2025, from Fire Engineering: https://www.fireengineering.com/firefighting/your-first-mayday-shouldnt-be-the- real-thing/ Municode. (2024, October 3). Code of Ordinances City of Houston, Texas. Retrieved December 2024, from https://library.municode.com/tx/houston/codes/code_of_ordinances?nodeId=COOR_CH10BUNEPR _ARTIXBUST_DIV5DABU Muni-Link. (2024, December 5). Local Gov Communcation Strategies. Retrieved January 2025, from muni- link.com: https://muni-link.com/blog/local-government-communication-strategies/ NFPA 1. (2024). Fire Code. Quincy, MA, United States of America: National Fire Protection Association. Retrieved January 2025 NFPA 1550. (2024). Standard for Emergency Responder Health and Safety. Quincy, MA, United States of America: National Fire Protection Association. Retrieved October 2024 NFPA 1660. (2024). Standard for Emergency, Continuity, and Crisis Management: Preparedness, Response, and Recovery. Quincy, MA, United States of America: National Fire Protection Association. Retrieved December 2024 NFPA 1700. (2021). Guide for Structural Fire Fighting. Quincy, MA, United States of America: National Fire Protection Association. Retrieved January 2025
Page 30
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas NFPA 1971. (2018). Standard on Protective Ensembles for Structural Fire Fighting and Proximity Fire Fighting. Quincy, MA, United States of America: National Fire Protection Association. Retrieved December 2024 NFPA 1981. (2013). Standard on Open-Circuit Self-Contained Breathing Apparatus (SCBA) for Emergency Services. Quincy, MA, United States of America: National Fire Protection Association. Retrieved December 2024 NIOSH. (2020). F2020-10: Career captain and career firefighter die after running out of air during a search in a public library - California. by Miles S., Bowyer M., Funke J. Morgantown, WV: U.S. Department of Health and Human Services, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health. Retrieved January 2025 NIOSH. (2022). F2020-04: Career firefighter killed in a structural collapse while conducting fire attack and search in a derelict single-family residence - Missouri. By Richardson M., Miles S. Morgantown, WV: U.S. Department of Health and Human Services, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health. NIOSH. (2024). F2021-10: Volunteer firefighter killed after becoming trapped at an assisted living facility fire and two firefighters injured - New York. by Loflin M., Attwood W.,. Morgantown, WV: U.S. Department of Health and Human Services, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health. Retrieved December 2024, from https://www.cdc.gov/niosh/firefighters/programs/pdfs/face202110.pdf Pond, M. (2023, October 9). Breaking Barriers: Communications Access in Local Goverment. Retrieved January 2025, from www.lexipol.com: https://www.lexipol.com/resources/blog/breaking-barriers- communications-access-in-local-government/ Salka Jr., J. J. (2024, June 14). The Fire Scene: The Three Stages of RIT Operations. Retrieved January 2025, from Firehouse: https://www.firehouse.com/operations-training/article/21221071/the-fire- scene-the-three-stages-of-rit-operations U. S. Fire Administration. (2018). Risk Management Practices. Retrieved January 2025, from www.usfa.fema.gov: https://www.usfa.fema.gov/downloads/pdf/publications/risk_management_practices.pdf Weather Underground. (2024, November 6). Houston, TX Weather Hustory. Retrieved December 2024, from Weather Underground: https://www.wunderground.com/history/daily/us/tx/houston/KHOU/date/2024-11-6
Page 31
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas Investigator Information This incident was investigated by Louis (Rick) Lago, Investigator, and Stephen J. Ringer, Investigator, both with the Fire Fighter Fatality Investigation and Prevention Program, Surveillance and Field Investigations Branch, Division of Safety Research, NIOSH located in Morgantown, WV. The report was written by Stephen J. Ringer and Dr. Wesley R. Attwood, Investigator and Program Advisor. Dan Madrzykowski and Keith Stakes from the Fire Safety Research Institute, part of the UL Research Institutes, provided a technical review of the investigation report. A subject matter expert review was provided by Michael Italia, Zoning Officer/Building Code Official, Barry Isett & Associates. The NFPA Emergency Response & Responder Safety Division also provided a technical review. Disclaimer The information in this report is based upon dispatch records, audio recordings, video recordings, witness statements, and other information that was made available to the National Institute for Occupational Safety and Health (NIOSH). Information gathered from witnesses may be affected by recall bias. The facts, contributing factors, and recommendations contained in this report are based on the totality of the information gathered during the investigation process. This report was prepared after the event occurred, includes information from appropriate subject matter experts, and is not intended to place blame on those involved in the incident. Mention of any company or product does not constitute endorsement by NIOSH, Centers for Disease Control and Prevention (CDC). In addition, citations to websites external to NIOSH do not constitute NIOSH endorsement of the sponsoring organizations or their programs or products. Furthermore, NIOSH is not responsible for the content of these websites. All web addresses reference in this document were accessible as of the publication date. NIOSH Approved is a certification mark of the U.S. Department of Health and Human Services (HHS) registered in the United States and several international jurisdictions.
Page 32
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas Appendix A: Building Risk Assessments and Classifications (Courtesy of the fire department) A. Life Hazards (4 – 15 points) a. Occupancy Type i. Light (1 point) - Light hazard occupancies are defined as occupancies or portions of other occupancies where the quantity and/or combustibility of contents is low and fires with relatively low rates of heat release are expected. Examples: Animal Shelters Hotels Offices Churches Institutional Residential Homes Clubs Kennels Restaurants Educational Museums Theaters and Auditoriums Hospitals Nursing Homes Used attics Libraries
ii. Ordinary (3 points) - Ordinary hazard occupancies are defined as occupancies or portions of other occupancies where the quantity and combustibility of contents are low to high and fires with relatively moderate rates of heat release are expected. Examples: Agricultural Facilities Glass Products Manufacturing Post Office Processing Automobile Parking Horse Stables Printing and Publishing Bakeries Laundries Racetrack Stables Canneries Leather Goods Manufacturing Repair Garages Cereal Mills Local Fairgrounds Resin Application Area Chemical Plants (ordinary) Machine Shops Textile Manufacturing Confectionary Products Metal Working Tire Manufacturing Distilleries Mercantile/Retail Tobacco Product Manufacturing Dry Cleaners Paper and Pulp Mills Wood Machining Electronic Plants Paper Processing Plants Wood Product Assembly Exterior Loading Docks Piers and Wharves
Feed Mills
Page 33
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas iii. Extra Hazard (5 points) - Extra hazard occupancies are defined as occupancies or portions of other occupancies where the quantity and combustibility of contents are very high, flammable, or combustible liquids are present, dust, lint, or other materials are present, introducing the probability of rapidly developing fires with high rates of heat release. Examples: Asphalt Saturating Plywood and Particle Board Manufacturing Combustible Hydraulic Fluid Areas Printing (inks, flashpoints, 100° F) Die Casting Rubber Facilities Flammable Liquids Spraying Sawmills Flow Coating Solvent Cleaning Manufactured/Modular Home Assemblies Textile Picking, Opening, Blending Metal Extruding Upholstering with Plastic Foams Plastics Processing Varnish and Paint Dipping b. Number of Occupants - Number of occupants that are typically in the building. Buildings that fluctuate with occupants have its maximum occupancy limit, designed occupancy, or the estimated amount for a normal event listed (i.e., Church – use the typical Sunday Service). i. 0 to 10
1 point ii. 11 to 50
2 points iii. >50
3 points c. Occupant Mobility – are the occupants able to egress the building without any assistance? i. Ambulatory (yes)
1 point ii. Non-ambulatory (no)
3 points d. Building Code Classification - The Building Code classifies occupancies in specified categories. The Standard of Cover manual recommends that various types of classifications be grouped together into low, moderate, high, and special risks to ensure appropriate deployment of fire suppression resources. See Building Code Classification with Examples for definition of each classification. i. Group (M)-Mercantile
1 point ii. Groups (E)-Educational, (R-1 to R-4)-Residential
2 points iii. Groups (A)-Assembly, (B)-Business, and (S)-Storage 3 points iv. Groups (I)-Institutional and (F)-Factory
4 points B. Building Type (7 to 25 points) a. Type I (1 point) - Type I Fire Resistive construction has structural components that are non- combustible materials, usually steel or concrete, that offers a fire-resistance rating that ensures the efficiency of the inherent built-in fire protection. These types of construction are most common in Groups B and I building code classifications.
Page 34
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas b. Type II (1 point) - Type II Non-Combustible construction may not afford any fire-resistive rating because it is generally designed with exposed structural elements. This type of construction is most common in Low-rise and Group R building code classifications. c. Type III (2 points) - Type III Ordinary construction is usually divided into protected and unprotected subtypes. Exterior walls are usually masonry and built with brick or block walls and have a wooden roof, wall and floor assembly which is not protected against fire. These buildings are frequently found in "warehouse" districts of older cities. This type of construction is most common in Group B and R building code classifications. d. Type IV (2 points) - Type IV Heavy Timber construction have large cross-sectional areas with all elements (columns, pillars, arches, floors, and roofs) being heavy wood design with a minimum nominal dimension of 8 inches or greater. Exterior walls are usually made of noncombustible masonry walls and usually found in older factories and mills. e. Type V (3 points) - Type V Wood Frame construction has mainly wood components for exterior and interior walls are made many other materials permitted by international and local building codes. The three most common subtypes relating to framing and foundations include Post and Beam, balloon frame, and platform frame. This type of construction is most common in Group R building code classifications. C. Square Footage - This is the square footage per floor of the building. This shall not be reduced by firewalls or separations. The County Property Appraiser files should be used if the square footage is not able to be determined. a. 0 to 2,500 sq. ft.
1 point b. 2,501 to 10,000 sq. ft.
2 points c. >10,000 sq. ft.
3 points D. Number of Stories - This is the total number of stories for the building. If a building contains a basement, this should be added as a story. Buildings with attics that can be inhabited should also be added as an additional story. a. 1 to 3
1 point b. 4 to 6
3 points c. >7
5 points E. Fire Protection - Identify if the building is protected by fire protection equipment. If the building is not completely covered, they should be considered as having none. a. Sprinkler System and Fire Alarm Monitored
1 point b. Fire Alarm or Sprinkler System Not Monitored
2 points c. None
3 points F. Fire Flow a. 0 to 1,000 gpm
1 point b. 1,000 to 3,000 gpm
2 points c. 3,001 to 4,000 gpm
3 points
Page 35
Report # F2024-06 Career firefighter dies and another injured while performing rapid intervention team tasks at vacant warehouse fire – Texas d. >4,000 gpm
5 points G. Age of Building a. 0 to 10 years
1 point b. 11 to 21 years
2 points c. >21 years
3 points H. Access to Building - The risk to the occupancy increases if access to the property is difficult. This delays operations to mitigate the incident. Examples of difficult access are parts of building not accessible to apparatus and security gates. a. No Access Problems
1 point b. Moderate Access (Security Gate)
2 points c. Significant Access Problems (50 percent inaccessible)
3 points I. Community Value (3 – 9 points) a. Historic Value - Buildings that if they exhibit a catastrophic event would have a historic impact on the community. Examples would include historic buildings, churches museums. i. No
1 point ii. Yes
3 points b. Social Value - Buildings that if they exhibit a catastrophic event would have a social impact on the community. Examples would include City Hall, Libraries, Police Stations, Recreation Centers, schools, and churches. i. No
1 point ii. Yes
3 points c. Economic Value - Buildings that if they exhibit a catastrophic event would have an economic impact on the community. Examples would include large industrial properties such as Big Box stores, and large grocery stores. i. No
1 point ii. Yes
3 points Officers should add up all points associated with each category to determine a Final Risk Assessment Score. Do to the extremely high number of buildings in each response area, a goal should be set at performing a Pre-Fire Plan on buildings with High and Special risk values first. District Chiefs and Company Officers should consider performing a Pre-Fire Plan on buildings with Low and Moderate risk as time permits. Final Risk Assessment Score
Low 14 to 22 points Moderate 23 to 35 points High 36 to 42 points Special 43 to 49 points
FD06034 | 2025_美国_NIOSH_face202502.pdf
分类:06_境外及港澳台调查报告 | 年份:2025 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
Page i
One Firefighter Dies During Unprotected Search in Nine- Apartment Building that was Originally Constructed to be a Single-Family House – Hawaii Executive Summary On January 6, 2025, 25-year-old firefighter died after becoming disoriented and trapped while conducting an unprotected search in a nine-apartment residential building fire. At 19:44 hours, the Fire Communications Center (FCC) dispatched Engine 2, Engine 4, Engine 9, Engine 29, Ladder 2, and Battalion 1 for a building fire. A caller noted that apartment #9 was involved. After receiving multiple calls, the FCC upgraded the incident to a second alarm at 19:45 hours. The second alarm dispatched Engine 1, Engine 22, Ladder 29, and Rescue 1. At 19:47 hours, Engine 2 arrived on-scene and provided a size up of a two-story apartment building, lazy smoke visible, but no flames. They pulled a pre-connect hoseline for fire attack while Engine 29 arrived and established a water supply. At 19:48 hours, Ladder 2 and Engine 9 arrived on-scene. At 19:50 hours, Ladder 29 and Battalion 1 arrived on-scene. Battalion 1 requested a conditions, actions, needs (CAN) report. Engine 2A responded that they had water on the fire from the exterior Side Charlie/Delta and the fire was located on the first division. Engine 9 entered and was performing searches on the second division. Engine 2 made entry from Side Charlie/Delta for fire control and primary search. Ladder 2 entered the building from the front door located on Side Alpha to perform searches on the first division. Engine 9 reported to Battalion 1 that they did not have a hoseline and that there was no fire on the second division. At 19:54 hours, Battalion 1 assigned Engine 4 to stage on Side Alpha with their rapid intervention team (RIT) gear and requested that Ladder 29 perform a 360 size-up of the building and secure utilities. At 19:55 hours, Engine 9A called a Mayday noting they were cut off with fire in the stairwell on the second division. Ladder 29A reported they had flames lapping up on the Side Delta toward the second division. Battalion 1 ordered multiple units to pull additional hoselines and assist with rescue of the Engine 9 firefighters. At 19:59 Photo 1: The apartment building, post-fire, Side Alpha (Courtesy of NIOSH) REPORT 2025-02 • April 2025
Page ii One Firefighter Dies During Unprotected Search in Nine-Apartment Building that was Originally Constructed to be a Single-Family House – Hawaii Report # F2025-02 hours, Engine 9A reported that they were on the second division landing on Side Alpha. He further reported that his facepiece was melting, they had two firefighters, two firefighters were missing, and they needed water. At 20:01 hours, Engine 9A reported to Battalion 1 they had two firefighters out of the building with Rescue 1 but were still missing two firefighters. Multiple units reported that deteriorating fire conditions were delaying entry to the building. Engine 9A advised Battalion 1 that the missing firefighters were Engine 9C and Engine 9D (deceased firefighter). One minute later, Engine 9C transmitted that he was outside the building. At 20:21 hours, Engine 4A transmitted that they found the downed firefighter on the Bravo/Charlie corner on the first division and requested assistance. At 20:24 hours, Ladder 29A transmitted priority traffic that if all personnel were accounted for, all units should go to a defensive strategy as the second division was now fully involved. At 20:25 hours, Battalion 1 advised the FCC that the victim had been extricated and moved to EMS. Engine 9D was transported to a local hospital where he was pronounced deceased. Contributing Factors • Unprotected interior search • Hoseline selection and deployment • Door control/flow path • Mayday operations • Change of occupancy. Key Recommendations Fire departments should: • Ensure that interior search crews’ means of egress are protected by a staffed hoseline. • Use the appropriate hoseline based on conditions present. • Train on recognition of flow paths and interior fire attack techniques utilizing door control. • Employ proactive RIT operations for access and egress.
Governing municipalities (federal, state, regional/county, and local) should: • Ensure that the delegated zoning or building code enforcement authority shares change of occupancy information with the fire department.
The National Institute for Occupational Safety and Health (NIOSH) initiated the Fire Fighter Fatality Investigation and Prevention Program to examine deaths of fire fighters in the line of duty so that fire departments, fire fighters, fire service organizations, safety experts and researchers could learn from these incidents. The primary goal of these investigations is for NIOSH to make recommendations to prevent similar occurrences. These NIOSH investigations are intended to reduce or prevent future firefighter deaths and are completely separate from the rulemaking, enforcement, and inspection activities of any other federal or state agency. Under its program, NIOSH investigators interview persons with knowledge of the incident and review available records to develop a description of the conditions and circumstances leading to the deaths in order to provide a context for the agency’s recommendations. The NIOSH summary of these conditions and circumstances in its reports is not intended as a legal statement of facts. This summary, as well as the conclusions and recommendations made by NIOSH, should not be used for the purpose of litigation or the adjudication of any claim. For further information, visit the program at www.cdc.gov/niosh/firefighters/fffipp/ or call 1-800-CDC-INFO (1-800-232-4636).
One Firefighter Dies During Unprotected Search in Nine- Apartment Building that was Originally Constructed to be a Single-Family House – Hawaii
Page 1 REPORT F2025-02 • April 2025 Introduction On January 6, 2025, 25-year-old firefighter died after becoming disoriented and trapped while conducting an unprotected search in a nine-apartment residential building fire. On January 27, 2025, the U.S. Fire Administration (USFA) notified the National Institute for Occupational Safety and Health (NIOSH) of this incident. On February 2 – 9, 2025, an investigator representing the NIOSH Fire Fighter Fatality Investigation and Prevention Program (FFFIPP), along with a representative from the International Association of Fire Fighters (IAFF), traveled to Hawaii to investigate this incident. The investigators conducted interviews with command officers, fire officers, firefighters, fire investigators, and other emergency personnel who were on-scene at the incident. NIOSH investigators inspected the personal protective equipment (PPE) used by the firefighter and inspected the apartment building. The investigators reviewed fire department standard operating guidelines (SOGs), training records, dispatch records, witness statements, investigation documents, and the medical examiner’s report. Fire Department This career fire department has a 597 square mile jurisdiction, serves a population of one million residents, annually responds to an average of 60,000 calls, and provides emergency medical services (EMS) at the Basic Life Support (BLS) non-transport level. The fire department maintains 43 stations and an aircraft station.
The fire department is comprised of 1,120 uniformed personnel across five battalions. Fifteen suppression battalion chiefs and two administrative battalion chiefs manage the five battalions that are divided into three platoons each. Daily staffing is 333 firefighters. Staffing for engine and aerial companies is four to five personnel which includes a fire captain, an apparatus operator, and two to three firefighters. Hazmat and rescue companies are staffed with five personnel, including a fire captain, an apparatus operator, and three hazmat technicians or rescue technicians. The fire department’s leadership is comprised of a fire chief, deputy fire chief, and four assistant chiefs who manage the four divisions.
Assistant chiefs oversee these divisions: • Fire Operations manages incident response. • Administrative Services performs budget, human resources, occupational safety and health, inventory management, and apparatus maintenance and replacement.
Page 2 One Firefighter Dies During Unprotected Search in Nine-Apartment Building that was Originally Constructed to be a Single-Family House – Hawaii Report # F2025-02 • Support Services manages the training and research bureau and fire prevention bureau which conduct activities such as firefighter recruit training, incumbent firefighter training and education, certification, fire code enforcement, fire investigation, and public education. • Planning and Development facilitates the accreditation process, maintains the department’s strategic plan, grant funding programs, FCC, and radio operations. Training, Education, and Professional Development The fire department maintains a training and research bureau that provides initial firefighter recruit training, incumbent firefighter training, and continuing education for all firefighters, fire officers, and EMS personnel. The initial training for recruits consists of eight months of academy lecture and hands- on skills development. Recruits graduate the academy with International Fire Services Accreditation Congress (IFSAC) professional certification as Fire Fighter I, Fire Fighter II, Fire Apparatus Driver/Operator, and Hazmat Awareness and Operations. Recruits also graduate with a City Operator certification and as a nationally registered emergency medical technician (EMT).
Engine 9D (deceased firefighter) had 1.5 years of fire service with the department. He maintained training in and held numerous certifications as Fire Fighter I, Fire Fighter II, Fire Apparatus Driver/Operator, Hazmat Awareness and Operations, and EMT provider.
During this incident, the first four arriving apparatus on-scene had acting company officers (Engine 2, Engine 29, Ladder 2, and Engine 9). All were trained to the professional development set by the department, including a national hazard zone incident command training and certification program. Apparatus and Communications The fire department maintains 63 frontline apparatus, including 43 engines, 16 aerials, and four tankers. The aerials include a total of eight two-piece combination apparatus (equipped with a 100’ mid-mount aerial ladder), six quint apparatus (equipped with a 75’ rear mount aerial), and two tower apparatus (equipped with an 85’ rear mount platform). The fire department has two hazmat companies, two heavy rescue companies, and three helicopters.
Table 1. Units dispatched to the building fire between 19:44 – 19:45 hours
First Alarm Units Dispatched Second Alarm Units Dispatched Apparatus Arrival On-Scene Apparatus Arrival On-Scene Engine 2 19:47 Rescue 1 19:49 Engine 29 19:47 Ladder 29 19:50 Ladder 2 19:48 Engine 1 19:56 Engine 9 19:48 Engine 22 19:57 Engine 4 19:49
Battalion 1 19:50
Page 3 One Firefighter Dies During Unprotected Search in Nine-Apartment Building that was Originally Constructed to be a Single-Family House – Hawaii Report # F2025-02 The primary Public Safety Answering Point (PSAP) dispatches for the jurisdiction’s city services. These include law enforcement, fire, EMS, and mass transit. The FCC has four platoons with six dispatchers each. All fire dispatchers are also certified firefighters. Radio communications are conducted on dedicated tactical channels that are assigned to different areas of the jurisdiction. Box assignments include four engines, a ladder, and a battalion chief. The FCC can upgrade the incident based on what is reported. Second alarm adds two engines and a ladder. Third alarm adds two engines, a ladder, and an additional battalion chief. The portable radio designation/identifier for each firefighter is based upon assignment in each apparatus. This includes “A” for officer, “B” for driver/operator, and “C” or “D” for firefighters. Building Construction and Occupancy Status This single-family residence, built in 1906, was located at the front of the property near the street. Official department of planning and permitting records indicate that the building was relocated to the rear of the property in 1954 (see Photo 2), and an additional residence was built on the same property against the street. The two- story building involved in the incident was 32 ft x 62 ft, with 1,770 square feet on the first division, and 550 square feet on the second division. After the building was relocated, it was converted from a single-family residence into a nine-unit multi-family residence, with six units on the first division and three units on the second division. The building had a post and pier foundation, 2” x 6” floor joists, and 1” x 12” floor sheathing (see Photo 3). The walls were a combination of 2” x 4” studs with 1” x 12” interior sheathing and 1” exterior shiplap siding, and single wall construction. Single wall construction is unique to Hawaii and utilizes 1” x 12” boards oriented horizontally on one side, and 1” x 12” boards oriented vertically on the opposite side to create walls without any vertical structural members or studs (see Photo 4). The roof consisted of conventionally framed 2” x 4” rafters with 1” x 4” skip sheathing, which had been covered over by plywood at some point. The building had been Photo 2: The apartment building (red square), post- fire, view from above on Side Alpha. (Courtesy of the fire department) Photo 3: Post and pier foundation. (Courtesy of NIOSH)
Page 4 One Firefighter Dies During Unprotected Search in Nine-Apartment Building that was Originally Constructed to be a Single-Family House – Hawaii Report # F2025-02 remodelled during its life cycle, and as a result, there was a combination of 1” shiplap and Canec fiberboard interior wall finishes. Canec is a fiberboard building material made from sugar cane bagasse, which is the residual fiber that remains after juice has been extracted from the sugar cane. Canec fiberboard was used extensively as an interior wall finish until 1964. In this incident, the Canec interior wall coverings were heavily charred and likely contributed to flame spread within the structure (see Photo 5).
Throughout the building, there were several doors that were permanently shut to separate the individual dwelling spaces. These doors did not provide sufficient fire separation and even contributed to fire spread between units (see Photo 6). Occupancy Status In 1955, after the building had been relocated to the rear of the property, official building records show that the building’s occupancy classification was listed as “Hotel & Apartments”. This is the first recorded documentation indicating that the building was no longer a single-family residence. In 1974, a Certificate of Occupancy was granted for the building to contain 10 individual apartments. These occupancy changes were never shared with the fire prevention bureau, and as a result, it was never included in their inspection program or identified as a multi-family occupancy. The apartment layout within the building is shown below in Diagrams 1 and 2.
Photo 4, 5, and 6: Single wall construction (left) Canec fiberboard interior wall finishes (middle), and door (right). (Courtesy of NIOSH)
Page 5 One Firefighter Dies During Unprotected Search in Nine-Apartment Building that was Originally Constructed to be a Single-Family House – Hawaii Report # F2025-02
Diagram 1: First division of the apartment building with windows shown in blue. (Courtesy of the Bureau of Alcohol, Tobacco, Firearms and Explosives)
Page 6 One Firefighter Dies During Unprotected Search in Nine-Apartment Building that was Originally Constructed to be a Single-Family House – Hawaii Report # F2025-02
Incident Timeline The following timeline is a summary of events that occurred as the incident evolved shortly after 19:44 hours on Monday, January 6, 2025. Not all incident events are included in this timeline. The times are to Diagram 2: Second division of the apartment building with windows shown in blue. (Courtesy of the Bureau of Alcohol, Tobacco, Firearms and Explosives)
Page 7 One Firefighter Dies During Unprotected Search in Nine-Apartment Building that was Originally Constructed to be a Single-Family House – Hawaii Report # F2025-02 the minute and were taken from the fire departments’ National Fire Incident Reporting System (NFIRS) fire reports, dispatch log, on-scene accountability documentation, and interview notes. Time Fireground Operations, Response, and Details January 6, 2025
19:44 Hours • FCC dispatched Engine 2, Engine 4, Engine 9, Engine 29, Ladder 2, and Battalion 1 for a building fire with the caller noting apartment #9. 19:45 Hours • FCC upgraded the incident to a second alarm and dispatched Engine 1, Engine 22, Ladder 29, and Rescue 1. 19:47 Hours • Engine 2 arrived on-scene and provided a size up of a two-story apartment building, smoke visible, but no flames. • Engine 29 radioed that they would establish a water supply. 19:48 Hours • Ladder 2 and Engine 9 arrived on-scene. 19:49 – 19:50 Hours • Engine 4, Ladder 29, and Battalion 1 arrived on-scene. 19:51 Hours • Engine 2A reported having water on the fire from the exterior and were trying to go to the interior. The fire location was reported to be on the first division on Side Charlie/Delta. 19:53 Hours • Engine 2A made entry for a primary search. • Engine 9A was completing a primary search on the second division without a hoseline – no fire identified. 19:54 Hours • Engine 4 staged on Side Alpha with their RIT gear. • Ladder 29 performed a 360 size-up to report and secure utilities to the building. 19:55 Hours • Engine 9A called a Mayday noting they were cut off on the second division with fire in the stairwell. • Ladder 29A reported flames lapping up on Side Delta toward the second division.
Page 8 One Firefighter Dies During Unprotected Search in Nine-Apartment Building that was Originally Constructed to be a Single-Family House – Hawaii Report # F2025-02 Time Fireground Operations, Response, and Details 19:57 Hours • Engine 9A requested a hoseline while reporting to Battalion 1 that they were on the second division Side Alpha, above the stairwell, overcome with flames. 19:58 Hours • FCC advised all units on the fireground that a Mayday has been declared and requested all companies to maintain radio discipline. 19:59 Hours • Engine 9A reported being on the second division landing but unsure what side of the building. His facepiece was melting, they had PAR of two, were missing two firefighters, and they needed water. 20:01 Hours • Engine 9A reported to Battalion 1 that two firefighters were out with Rescue 1 but were still missing two firefighters. • Engine 22A, not yet entered, reported being on Side Bravo and hearing screams for help in the back corner of the building on Sides Bravo/Charlie. 20:02 – 20:03 Hours • Engine 9A advised Battalion 1 that the missing firefighters were Engine 9C and Engine 9D (deceased firefighter). • Engine 9C said they were outside the building but Engine 9D was still unaccounted for. 20:04 Hours • Battalion 1 requested the FCC send two EMS units to the scene. 20:06 Hours • Ladder 29A had a ladder on Side Alpha, two ladders on Side Bravo, and were unable to ladder Sides Charlie and Delta due to the fire. 20:07 Hours • Engine 29A was on the Charlie/Delta corner with heavy fire involvement and partial roof collapse. 20:09 Hours • Engine 22A had three hoselines conducting fire attack from the exterior on Sides Bravo and Charlie. They reported no longer hearing screams for help and did not have control of the fire yet. 20:17 Hours • Engine 22 advised Battalion 1 that they had water on the fire on the second division of the Sides Bravo and Charlie but were unable to control the fire from their position.
Page 9 One Firefighter Dies During Unprotected Search in Nine-Apartment Building that was Originally Constructed to be a Single-Family House – Hawaii Report # F2025-02 Personal Protective Equipment At the time of the incident, Engine 9D was wearing full structural firefighting turnout gear and a NIOSH Approved® MSA Model G1, 45-minute, 4500 psi SCBA. The investigators inspected and photographed the PPE. Engine 9D had a personal two-way radio that was confirmed to be in the “on” position and on the correct tactical channel. During the incident, Engine 9D made two inaudible radio transmissions. He manually activated his PASS device approximately seven minutes after turning on his SCBA. There was no evidence to suggest that the turnout gear or SCBA contributed to the fatality. Weather Conditions At 18:53 hours on January 6, 2025, the outdoor temperature was 77°F, dewpoint was 70°F, the wind was out of the southwest at 8 mph, there had been no precipitation in the last 24 hours, and conditions were fair [Weather Underground 2025]. Investigation At 19:44 hours, the FCC dispatched Engine 2, Engine 4, Engine 9, Engine 29, Ladder 2, and Battalion 1 for a building fire, with the caller noting apartment #9. After receiving multiple calls, the FCC upgraded the incident to a second alarm at 19:45 hours. The second alarm dispatched Engine 1, Engine 22, Ladder 29, and Rescue 1. The FCC advised all incoming units to operate on the B2 tactical channel 3 for the incident.
Time Fireground Operations, Response, and Details 20:21 Hours • Engine 4A transmitted priority traffic that they found the downed firefighter on the Bravo/Charlie corner and requested assistance. 20:24 Hours • Ladder 29A transmitted via priority traffic that if all personnel were accounted for, all units should go to a defensive strategy as the second division was now fully involved. • Engine 4A came down with the victim through Side Alpha and needed medical assistance immediately. • Battalion 1 ordered all units not assisting with the victim to completely exit and evacuate the structure. • The FCC transmitted emergency tones, informed all personnel that strategy is changed from offensive to defensive, all personnel exit the building and give PARs upon exiting. 20:25 Hours • Battalion 1 advised the FCC that the victim was extricated and being transferred to EMS. Engine 9D was then transported to a local hospital and pronounced deceased.
Page 10 One Firefighter Dies During Unprotected Search in Nine-Apartment Building that was Originally Constructed to be a Single-Family House – Hawaii Report # F2025-02 At 19:47 hours, Engine 2 arrived on-scene and provided a size up of a two-story apartment building, lazy smoke visible, but no flames. Engine 2 pulled a pre-connect, 200 feet of 1 3/4”, for fire attack and requested the next arriving engine establish a water supply. Upon arrival, Engine 29 connected to the hydrant with 100 feet of 4” supply line and relayed water to Engine 2. Engine 29’s crew observed grey smoke as they approached the building. At 19:48 hours, Ladder 2 and Engine 9 arrived on-scene. Engine 2A requested their hoseline be charged and requested another company to bring forcible entry tools. Engine 2 firefighters observed smoke and fire coming through a window on Side Delta (apartment #9 kitchen). At 19:49 hours, Engine 4 arrived on-scene.
At 19:50 hours, Ladder 29 and Battalion 1 arrived on-scene. Battalion 1 staged 500 feet down the road from the incident and performed command from his vehicle using a tactical board and aide. Engine 2A again requested their hoseline be charged. Engine 29D made the same request for a charged hoseline but was on the wrong tactical radio channel. Engine 2A made an additional, new request to have their hoseline pressure increased. Engine 2B boosted the pressure to 120psi. Engine 2B previously secured the water supply before sending pressure to the hoseline. At 19:51 hours, Battalion 1 requested confirmation on incident status, indicating he had Engine 2 with a pre-connect stretched into the building; Engine 29 providing a water supply; and Engine 9, Ladder 2, Ladder 29, and Engine 4 on-scene. After Battalion 1requested a CAN report, Engine 2A responded that that they had water on the fire from the exterior (Charlie/Delta corner) and were going to try to go interior. Battalion 1 requested the location of the fire and asked if another company was assisting. Engine 2A responded that the fire was located on the first division. At 19:52 hours, Battalion 1 assigned Engine 29 to stage on Side Alpha as a 2 ½” pre-connect hoseline was stretched to Side Alpha.
At 19:53 hours, Engine 2A told Battalion 1 that they were making entry for a primary search on Sides Charlie/Delta of the first division. Rescue 1A then said that Ladder 2 firefighters were making entry on Side Alpha of the first division. They observed smoke coming from the sill on the Alpha/Delta corner prior to making entry. Battalion 1 requested that Ladder 2 complete a primary search on the first division. Engine 9A told Battalion 1 that they were conducting a primary search on the second division. Battalion 1 asked Engine 9A if they had a hoseline, to which Engine 9A said no and that there was no fire on the second division. Engine 9, however, had a set of irons and a thermal imaging camera with them. Upon entering the second division, they had limited visibility with light colored smoke but no heat.
At 19:54 hours, Battalion 1 assigned Engine 4 to stage on Side Alpha with their RIT gear. Battalion 1 requested that Ladder 29 perform a 360 size-up to report and secure utilities to the building. Engine 29A indicated they had an electric service line above them on the Alpha/Delta corner with flames blowing out on Side Delta. As Ladder 2 completed a search of apartment #3 (Alpha/Bravo corner), they observed light smoke and a flash coming from down the hallway (towards Side Charlie). As Ladder 2 firefighters completed searches of apartments #1 and #3, a firefighter kicked open the door of apartment #2. Upon entering between two to three feet into apartment #2, heat and flames were observed spreading towards the firefighter from Side Charlie of the room. Within approximately 10 seconds, the room flashed, and the firefighter immediately exited apartment #2. Ladder 2 was forced to evacuate out Side Alpha. This fire extended out of apartment #2, into the hallway, and eventually up the stairs to the second division.
Page 11 One Firefighter Dies During Unprotected Search in Nine-Apartment Building that was Originally Constructed to be a Single-Family House – Hawaii Report # F2025-02 At 19:55 hours, Engine 9A called a Mayday noting they were cut off on the second division with fire in the stairwell. He also engaged his radio’s emergency alert button. Battalion 1 acknowledged the transmission and Ladder 29A reported there were flames lapping up on Side Delta toward the second division. They deployed another pre-connect hoseline, 200 feet of 1 ¾”, off Engine 2. The FCC confirmed to Battalion 1 that they had a Mayday from Engine 9A. Battalion 1 requested the FCC to sound the emergency tones. Engine 9 firefighters were forced to the floor due to rapid heat and zero visibility.
At 19:57 hours, the FCC transmitted the emergency tones and Battalion 1 advised all companies operating at the incident that they had a confirmed Mayday. Engine 9A reported to Battalion 1 that they were on the second division, above the stairwell, overcome with flames. They requested a hoseline. Battalion 1 requested Engine 1 to stretch a line to the second division and assist with getting the Engine 9 firefighters out. Engine 22A then advised that they were on Side Bravo with a hoseline set up. Battalion 1 requested they stretch that hoseline to the second division and get Engine 9 out. Engine 22A ordered their firefighters to make entry. At 19:58 hours, the FCC advised all units on the fireground that a Mayday has been declared and requested all companies to maintain radio discipline. Ladder 2A advised Battalion 1 that they had a ground ladder and asked if he would like them to ladder the building.
At 19:59 hours, Battalion 1 requested a CAN report from Engine 9. Engine 9A responded that they were on the second division landing but unsure what side of the building. He further reported that his facepiece was melting, they had PAR of two, were missing two firefighters, and they need water. Battalion 1 then requested a CAN from Engine 22A who responded that they were making entry. Engine 22B advised that their apparatus was positioned at the Alpha/Bravo corner with only one hoseline deployed. Battalion 1 requested Engine 4 to stretch another hoseline off Engine 22 to get into the second division to assist with the Mayday. Engine 4 deployed 200 feet of 1 ¾”. Two Engine 9 firefighters, Engine 9A and 9B, found a door at the end of the hallway (apartment #8). Engine 9B used strength and an axe to breach through the door unaware of where it went, but thinking the environment had to be better on the other side. Engine 9A was now alone and found the hole in the door by feel. Both firefighters exited a window leading to a small roof. They then climbed down a 24 ft ladder thrown by Rescue 1.
At 20:01 hours, Engine 9A reported to Battalion 1 they have two firefighters out of the building with Rescue 1 but are still missing two firefighters. Battalion 1 acknowledged. Engine 22A reported that they were on Side Bravo and had not made entry yet. They heard screams for help in the back corner of the building. Battalion 1 requested a status report from Ladder 29 to soften the building to assist with the rescue operation. Ladder 29A reported that they have one ground ladder in place and two firefighters from Engine 1. Battalion 1 requested that all sides of the building be softened. At 20:02 hours, Engine 9A advised Battalion 1 that the missing firefighters were Engine 9C and Engine 9D (deceased firefighter). One minute later, an inaudible radio transmission was received from Engine 9C. Battalion 1 responded asking Engine 9C to locate Engine 9D, turn on their personal alert safety system (PASS) devices and a flashlight, and find a window to call for help. Engine 9C responded that he was outside the building but Engine 9D was still unaccounted for. Battalion 1 then attempted to call Engine 9D by name on the radio and requested they respond.
Page 12 One Firefighter Dies During Unprotected Search in Nine-Apartment Building that was Originally Constructed to be a Single-Family House – Hawaii Report # F2025-02 At 20:04 hours, the FCC requested confirmation that the only missing firefighter at the incident was Engine 9D. Battalion 1 confirmed to the FCC and then relayed the message to Engine 22 and Engine 4. Engine 22A confirmed they are looking for Engine 9D but that they were still knocking down the fire and hadn’t made entry. Battalion 1 then requested the FCC send two EMS units to the scene. The FCC confirmed that one EMS unit was on-scene, another was being dispatched, and asked Battalion 1 if he wanted a third alarm. Battalion 1 declined the third alarm but requested two racks of SCBA air cylinders and a fire investigator be sent to the scene. He also advised the FCC that an electric company representative on-scene.
At 20:06 hours, Battalion 1 requested a CAN report from Engine 4. Engine 4A responded that they were on Side Bravo stretching a hoseline to get to the second division to make entry. Ladder 29A then advised that they have a ladder on Side Alpha, two ladders on Side Bravo, and were unable to ladder Sides Charlie and Delta due to the fire. At 20:07 hours, Engine 29A reported that they switched out with Engine 2 personnel. They stretched a 1 ¾” bumper line from Engine 2. They reported they are on the Charlie/Delta corner with heavy fire involvement and partial roof collapse. Ladder 2A then reported they cleared the first three rooms on the first division and requested to exit the building to swap out air cylinders. Battalion 1 acknowledged, and Engine 2A then reported that they were exiting to swap out air cylinders.
At 20:09 hours, Engine 22A requested Engine 22B to increase water pressure to their hoseline. Battalion 1 then requested they provide a CAN report. Engine 22A advised that they have three hoselines conducting fire attack from the exterior on Sides Bravo and Charlie. They reported they no longer heard screams for help and did not have control of the fire yet. Battalion 1 acknowledged. At 20:11 hours, Battalion 1 assigned Ladder 2 to stage on Side Alpha and requested a CAN report from Engine 4 who reported they were still trying to get up to the second division. At 20:13 hours, Engine 29A then reported that they were at the Charlie/Delta entrance looking in but could not see Engine 9D and needed water. Battalion 1 asked if they were interior or looking from exterior to which Engine 29A responded that they were exterior firefighting the fire. Battalion 1 requested they continue into the building to search the entire room. At 20:15 hours, Battalion 1 requested that Engine 2 stage on Side Alpha and that Engine 1 back up Engine 29 on the second division. He requested that they back them up on their hoseline or take another with them. Engine 29A then responded with a correction that they were on the first division of the Charlie/Delta corner and making their way to the second division.
At 20:17 hours, Engine 22 advised Battalion 1 that they had water on the fire on the second division of the Sides Bravo and Charlie but were unable to control the fire from their position. Battalion 1 then attempted to raise Engine 9D on the radio again. Ladder 29A reported that cleared from the second division of the Delta corner while Battalion 1 requested a CAN report from Engine 4. At 20:20 hours, Engine 29A reported the roof was fallen through with conditions changing to heavy smoke. Engine 4A advised Battalion 1 that they were still on the first division and completed a search of three rooms on Side Bravo and one on Side Delta. They reported they were making their way to the second division and still had fire on the first division Side Charlie. The FCC advised Battalion 1 that Engine 29 had a second Mayday. Battalion 1 requested a CAN report from Engine 29. Engine 29A requested to cancel their
Page 13 One Firefighter Dies During Unprotected Search in Nine-Apartment Building that was Originally Constructed to be a Single-Family House – Hawaii Report # F2025-02 Mayday stating it was emergency traffic about the roof collapsing and second division fire penetration. Engine 29A confirmed they were not in an emergency situation.
At 20:21 hours, Engine 4A transmitted priority traffic that they found the downed firefighter on the first division, Bravo/Charlie corner and requested assistance. Engine 4A noted that Engine 9D’s PASS was active, his foot was stuck on something, and he did not have a low air alarm. Battalion 1 acknowledged while Engine 29 reported they were going to swap out air cylinders and recycle. Ladder 29A reported they were conducting fire attack from the Charlie/Delta corner and had partial roof collapse on the second division. Battalion 1 requested Ladder 29A assistance with the rescue. Ladder 29A declined as they were conducting fire attack from the Side Delta exposure. At 20:22 hours, Engine 2A reported they were on the Charlie/Delta corner making entry to assist with the rescue. Battalion 1 requested confirmation of the unit that found the downed firefighter. The FCC then responded that they believed it was Engine 4 that had Engine 9D.
At 20:24 hours, Ladder 29A transmitted priority traffic that if all personnel are accounted for, all units should go to a defensive strategy as the second division was now fully involved. Battalion 1 confirmed and requested a CAN report from Engine 4 along with their location. Engine 4A responded that they were coming out with the victim through Side Alpha and needed medical assistance immediately. Battalion 1 then ordered all units not assisting with the victim to completely exit and evacuate the structure. The FCC then sounded the emergency tones and advised all units on-scene that per Battalion 1, they were to change strategies from offensive to defensive. The FCC requested all units exit the building and conduct PAR checks. At 20:25 hours, Battalion 1 advised the FCC that the victim had been extricated and they were getting him to EMS. Engine 9D was transported to a local hospital where he was pronounced deceased. Fire Origin and Cause The fire department, in collaboration with the Bureau of Alcohol, Tobacco, Firearms and Explosives National Response Team, completed an on-scene origin and cause fire investigation. The fire was classified as accidental due to unattended cooking. The fire originated in the kitchen of apartment #9, located at the rear of the structure. Contributing Factors Occupational injuries and fatalities are often the result of one or more contributing factors or key events in a larger sequence of events that ultimately result in injuries or fatalities. NIOSH investigators identified the following items as key contributing factors in this incident that ultimately led to the fatality: • Unprotected interior search • Hoseline selection and deployment • Door control/flow path • Mayday operations • Change of occupancy
Page 14 One Firefighter Dies During Unprotected Search in Nine-Apartment Building that was Originally Constructed to be a Single-Family House – Hawaii Report # F2025-02 Cause of Death According to the medical examiner report, Engine 9D’s cause of death was thermal injuries and inhalation of combustible products. Recommendations Fire departments should:
Recommendation #1: Ensure that interior search crews’ means of egress are protected by a staffed hoseline. Discussion: In this incident, Engine 9 made entry and conducted interior searches on the second division. When they entered, they had clear conditions, lights on within the building, and no indication of fire. They did not take a hoseline with them to control rapid fire growth or provide protection. Their means of egress was cut off by rapidly developing fire from the first division.
When conducting a search or fire attack above a fire, it is important for firefighters to recognize the potential danger of being trapped by the fire. This danger is influenced by the construction of the building. In buildings such as the one in this incident, vertical fire spread is more rapid. Flames may spread vertically and trap firefighters operating above the fire by traveling up the interior stairs, within concealed spaces, through windows, or up the combustible exterior siding [NIOSH 2012].
Fire departments should ensure that a charged hoseline is either advanced with the interior search crew or is operated by another firefighter to provide protection while entering an immediately dangerous to life and health environment. The only exception for entering a structure without an operational hoseline is when an occupant can be seen or heard within a few feet of the structure entry or the fire area. Additionally, deployed backup lines should be operational and dedicated to protect the interior crews and their means of egress [NIOSH 2012]. A backup hoseline performs three critical functions [IFSTA 2013]:
• Protecting the primary interior attack team from extreme fire behavior • Protecting the means of egress for interior team(s) • Providing additional fire suppression capacity in the event fire volume increases
Recommendation #2: Use the appropriate hoseline based upon current conditions. Discussion: At this incident, the fire department had several 1 ¾” hoselines and one 2 ½” hoseline deployed around the structure for fire suppression. As the fire grew in intensity, units notified the incident commander that they had water on the fire, but it was not enough to gain control of the fire. Use of deck cannons from on-scene apparatus were not effective due to the limited access and obstructions to the fire building. This delay in fire suppression hampered the ability of RIT and others involved in the rescue operation to enter the structure.
Page 15 One Firefighter Dies During Unprotected Search in Nine-Apartment Building that was Originally Constructed to be a Single-Family House – Hawaii Report # F2025-02 Firefighters need to provide the appropriate amount of water in the initial attack to put out the fire and stop potential fire growth. Fire departments generally use an 1 ¾” hoseline as the initial preconnect for residential structure fires. These lines are operated to provide 160 gallons per minute. These hoselines can be effective for suppression when the fire is confined to a single room and is in either the incipient or growth stages. However, modern furnishings such as televisions and mattresses are increasingly being manufactured with synthetic materials with high levels of hydrocarbons. These furnishings burn at greater speeds and intensity, facilitating rapid fire growth and extension [DeStefano 2016].
During an incident, firefighters should select and deploy the appropriate hoseline based upon fire conditions. While monitoring fire suppression activities, the incident commander, incident safety officer, or operations should evaluate whether the hose size is appropriate for the current fire conditions and other factors including [IFSTA 2015; IFSTA 2013]:
• Fire load and material involved • Location of fire • Size of building and fire area • Potential fire spread
Selecting the correct size of hoseline is critical. Inability to provide a sufficient volume of water for the size of the fire may delay extinguishment and expose firefighters to danger from rapid fire development.
Recommendation #3: Train on recognition of flow paths and interior fire attack techniques utilizing door control. Discussion: At this incident, Ladder 2 firefighters were completing searches in apartments #1 and #3 as a firefighter kicked open the door of apartment #2. Heavy fire immediately exited apartment #2 and created a flow path into the hallway, forcing Ladder 2 to evacuate out Side Alpha.
A flow path is “the movement of heat and smoke from the higher pressure within the fire area towards the lower pressure areas accessible via doors, window openings, and roof structures” [NFPA Glossary of Terms 2021]. Flow paths consist of an inlet and an exhaust with the direction of travel being determined by pressure. Heat and smoke in a high-pressure area will travel to an area of lower pressure. It is possible to have multiple flow paths within a structure dependent upon the size of the building, openings, closures such as fire doors, and overall structure design. Personnel working in the flow path (between the seat of the fire and the exhaust) operate in a significantly risky environment.
Maintaining door control is a critical component of coordinated ventilation and fire attack. Opening a door changes the ventilation profile of the structure and may have an adverse effect on fire behavior [IFSTA 2013]. Controlling the door limits the fresh air available to the fire and reduces the flow path. Once water is applied to the fire, it is no longer ventilation limited. This allows for more rapid and safer ventilation [Gray and Norwood 2024].
Page 16 One Firefighter Dies During Unprotected Search in Nine-Apartment Building that was Originally Constructed to be a Single-Family House – Hawaii Report # F2025-02 Recommendation #4: Employ proactive RIT operations for access and egress. Discussion: This fire department utilized rotating units for RIT until the arrival of a heavy rescue company. During this incident, Engine 4 was assigned to stage on Side Alpha with their RIT equipment. After the Mayday was called, rescue efforts were ordered with multiple units being assigned to assist with extricating Engine 9. These units were unable to make entry into the structure through the existing access and egress points due to the fire conditions and delay in effective fire suppression. Effective RIT operations are dependent on proactive efforts. Upon arrival, the RIT officer, accompanied by one member of the RIT, will get a report from the incident commander and then should perform an incident scene survey while the remaining RIT members assemble the RIT equipment. During the 360- degree survey, the RIT officer and members should look for ways in and out of the structure, including window configurations, fire escapes, and construction features. The RIT officer should note the feasibility for placement of ground ladders for rescue or escape purposes. The RIT officer has a responsibility to set up and secure a suitable secondary egress for interior crews [Rowett 2018; Toledo Fire & Rescue Department 2012]. After these tasks are completed, the RIT equipment is put in place and the RIT officer informs the incident commander that a 360-degree survey is complete and the RIT is ready to intervene, if necessary. The entire RIT should stay in an area immediately accessible to the building for rapid deployment and maintain radio contact with the incident commander. The RIT officer should brief all RIT members with the results of the incident scene survey [Toledo Fire & Rescue Department 2012]. The RIT officer and members will coordinate with the incident commander to formulate rescue plan contingencies and to monitor radio and fireground conditions. RIT protection is not a passive assignment. This is a process of ongoing information gathering and diligent scene monitoring until the unit is released by the incident commander [NIOSH 2024; NFPA 1407 2020].
Laddering:
The RIT should work to place a ladder to at least one window on each side of the building on every division that firefighters are operating (i.e., laddering). Ground ladders improve the ability to perform vent-enter-search operations to rescue a firefighter as well as the ability of the Mayday firefighter to self- rescue. Once the RIT has determined the need for an egress ladder, it is necessary to remove the window glass, but only after conferring with the incident commander that the removal of the window will not affect firefighting operations. Placing the egress ladder(s) at the window(s) should be announced over the radio by the RIT officer. [NIOSH 2024; Rowett 2018; Toledo Fire & Rescue Department 2012].
Softening:
After identifying existing ways in and out of the structure, the RIT should soften the building by forcing doors and removing devices such as security bars from windows. This proactive tactic ensures the RIT can quickly enter the building in the event of a firefighter emergency and improves the ability of self- rescue for firefighters operating in the interior. The goal of softening is to remove any obstructed building access, but it should be performed in a way that does not introduce an unintended flow path [NIOSH 2024; Rowett 2018].
Page 17 One Firefighter Dies During Unprotected Search in Nine-Apartment Building that was Originally Constructed to be a Single-Family House – Hawaii Report # F2025-02 Breaching:
In situations where the existing ways in and out of the structure, such as windows and doors, are not accessible due to fire conditions, the RIT should identify areas to enter by breaching walls. The initial survey of the structure includes identification of the construction features of the structure. Along with RIT equipment, the RIT should be able to identify areas to enter the building by breaching walls. The wall breach maneuver is generally taught as a firefighter survival technique to escape deteriorating conditions and the building. These maneuvers can also be employed to enter the structure to affect a rescue during a firefighter emergency [NIOSH 2024; Kiurski 2011]. All necessary actions, to include wall breaches and window conversions, should be executed to gain access to the interior of a structure.
Governing municipalities (federal, state, regional/county, and local) should:
Recommendation #5: Ensure that the delegated zoning or building code enforcement authority shares change of occupancy information with the fire department. Discussion: In 1955, official building records show that the building’s occupancy classification was listed as “Hotel & Apartments.” This is the first recorded documentation indicating that the building was no longer a single-family residence. In 1974, a Certificate of Occupancy was granted for the building to contain 10 individual apartments. These occupancy changes were never shared with the fire prevention bureau, and as a result, it was never included in their inspection program or identified as a multi-family occupancy. During the incident, the fire department believed they were responding to a single-family dwelling. The fire department in this incident maintains a fire prevention bureau that enforces fire codes for the jurisdiction, administers plans reviews, conducts fire inspections, and provides a fire and life safety education program for residents. The bureau utilizes the Hawaii State Fire Code for the jurisdiction which is an adoption of NFPA 1 Fire Code with modifications. The AHJ in this incident enforces zoning, subdivision, building, and housing ordinances through a department of planning and permitting. Through ordinance, this department enforces the 2018 International Building Code (IBC). NFPA 1201, Standard for Providing Fire and Emergency Services to the Public, Section 6.3 recommends that fire departments establish a good working relationship with the agency or authority responsible for enforcing the building code so that the review of the design, construction, alteration, or demolition of buildings and structures can be monitored to identify fire protection concerns. This includes sharing vital information between the entities from inspections, permits, code violations, fire protection maintenance and service, and investigation of fires or other emergencies [NFPA 1201 2020; IFSTA 2016]. This also includes relevant information from change of occupancy permits and approvals. When a change of occupancy is completed, the application of different code requirements may be required [IBC 2018]. Additionally, this can change factors such as the number of occupants being housed, storage of hazardous materials, or other unique hazards that can require significant change in
Page 18 One Firefighter Dies During Unprotected Search in Nine-Apartment Building that was Originally Constructed to be a Single-Family House – Hawaii Report # F2025-02 fire suppression and rescue tactics and strategy [IFSTA 2016]. This information is critical for fire department pre-incident planning. NFPA 1620 [2020] recommends that pre-incident plans document occupancy type and use including considerations for occupant load, accountability, means of egress, and assistance for people with self-evacuation limitations. When added to computer-aided dispatch, this information can assist incident commanders with formulating an incident action plan [NIOSH 2019]. References DeStefano M [2016]. Big fire, big water; little fire, little fire. Fire Engineering. Gray S and Norwood PJ [2024]. Modern firefighting tactics in residential structures: Ventilation, coordination, and control. Fire Engineering. IBC [2018]. International Building Code. Washington, D.C.: International Code Council. IFSTA [2013]. Essentials of fire fighting. 6th ed. Stillwater, OK: International Fire Service Training Association. IFSTA [2015]. Fire and emergency services safety officer. 2nd ed. Stillwater, OK: International Fire Service Training Association. IFSTA [2016]. Fire inspection and code enforcement. 8th ed. Stillwater, OK: International Fire Service Training Association. Kiurski T [2011]. Training days: Wall breach maneuver. Fire Engineering. NFPA [2019]. NFPA 1730, Standard on organization and deployment of fire prevention inspection and code enforcement, plan review, investigation, and public education operations. Quincy, MA: National Fire Protection Association. NFPA [2020]. NFPA 1201, Standard for providing fire and emergency services to the public. Quincy, MA: National Fire Protection Association. NFPA [2020]. NFPA 1407, Standard for training fire service rapid intervention crews. Quincy, MA: National Fire Protection Association. NFPA [2020]. NFPA 1620, Standard for pre-incident planning. Quincy, MA: National Fire Protection Association. NFPA [2021]. Glossary of terms. Quincy, MA: National Fire Protection Association. NIOSH [2012]. Volunteer fire fighter caught in a rapid fire event during unprotected search, dies after facepiece lens melts – Maryland. By Tarley J, Miles, S, Loflin M, and Merinar T. Morgantown, WV: U.S. Department of Health and Human Services, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health, F2011-02.
Page 19 One Firefighter Dies During Unprotected Search in Nine-Apartment Building that was Originally Constructed to be a Single-Family House – Hawaii Report # F2025-02 NIOSH [2019]. Career firefighter dies after becoming disoriented in a three-story apartment building – Massachusetts. By Loflin M, Merinar T, and Kline K. Morgantown, WV: U.S. Department of Health and Human Services, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health, F2018-18. NIOSH [2024]. Volunteer firefighter killed after becoming trapped at an assisted living facility fire and two firefighters injured – New York. By Loflin M and Attwood W. Morgantown, WV: U.S. Department of Health and Human Services, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health, F2021-10. Rowett A [2008]. The proactive RIT. Firehouse. Toledo Fire & Rescue Department [2012]. Rapid intervention team (RIT) standard operating procedure C82. Toledo, OH: Toledo Fire & Rescue Department. Weather Underground [2025]. Weather history. The Weather Underground. Date accessed: February 14, 2025. Investigator Information This incident was investigated by Patrick R. Montague, Investigator, with the Fire Fighter Fatality Investigation and Prevention Program, Surveillance and Field Investigations Branch, Division of Safety Research, NIOSH located in Morgantown, WV and James Johnson, Fire Ground Survival Master Instructor and Codes and Standards Representative, International Association of Fire Fighters. This investigation report was authored by Dr. Wesley R. Attwood, Investigator and Program Advisor, with the Fire Fighter Fatality Investigation and Prevention Program, Surveillance and Field Investigations Branch, Division of Safety Research, NIOSH and James Johnson. A subject matter expert review was provided by Karl Fippinger, Vice President, Fire and Disaster Mitigation, International Code Council. Additional Information International Code Council (ICC) The International Code Council is the leading global source of model codes and standards and building safety solutions that include product evaluation, accreditation, technology, training, and certification. The Code Council's codes, standards, and solutions are used to ensure safe, affordable, and sustainable communities and buildings worldwide. Access to codes and standards can be found at https://www.iccsafe.org/products-and-services/codes-standards/. Disclaimer The information in this report is based upon dispatch records, audio recordings, witness statements, and other information that was made available to the National Institute for Occupational Safety and Health (NIOSH). Information gathered from witnesses may be affected by recall bias. The facts, contributing factors, and recommendations contained in this report are based on the totality of the information gathered during the investigation process. This report was prepared after the event occurred, includes
Page 20 One Firefighter Dies During Unprotected Search in Nine-Apartment Building that was Originally Constructed to be a Single-Family House – Hawaii Report # F2025-02 information from appropriate subject matter experts, and is not intended to place blame on those involved in the incident. Mention of any company or product does not constitute endorsement by NIOSH, Centers for Disease Control and Prevention (CDC). In addition, citations to websites external to NIOSH do not constitute NIOSH endorsement of the sponsoring organizations or their programs or products. Furthermore, NIOSH is not responsible for the content of these websites. All web addresses referenced in this document were accessible as of the publication date. NIOSH Approved is a certification mark of the U.S. Department of Health and Human Services (HHS) registered in the United States and several international jurisdictions.
FD06035 | 2025_美国_NIOSH_face202503.pdf
分类:06_境外及港澳台调查报告 | 年份:2025 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
Page i
Career Firefighter Dies after being Trapped by Collapse of Two Vacant Commercial Buildings – New York Executive Summary On February 12, 2025, a career firefighter died after being trapped by the collapse of two vacant commercial buildings. At 21:39 hours, Squad 21 (SQ21), Quint 21- 2 (QT212), Quint 21-3 (QT213), Tower 21 (TW21), Engine 21-4 (EN214), and Car 21 were dispatched for reports of a building fire. The fire ambulance (7121) arrived on-scene and provided a size-up confirming a working fire with heavy smoke and visible flames from 1 Main to 3 Main. Once the incident commander (IC) arrived, he requested a 2nd alarm, additional apparatus, fire investigators, safety officer, and utilities be dispatched to the scene. The off-duty chief officers went to the scene when they heard the 2nd alarm requested. On-scene crews began fire suppression operations deploying hoselines around the buildings and evacuating residents from 5 Main while two other firefighters began opening 1 and 3 Main to flow water. At 21:48 hours, IC announced a defensive strategy for operations and ordered all units to exit the buildings. At 21:51 hours, IC reported a major collapse on Side Charlie on talk group 3 and dispatch channels. One firefighter (SQ21 firefighter) was trapped by this collapse under the fully intact facade which spanned from the sidewalk to a street parked car on Side Alpha. For about 19 minutes, multiple crews attempted to extricate the SQ21 firefighter from under the facade. After 20 minutes, two firefighters lifted the facade using spreaders and a combination tool. This provided enough room for crews to pull the SQ21 firefighter out towards the building. The SQ21 firefighter was placed on a stretcher and loaded into 7121 while a fire investigator performed CPR. Fire ambulance 7121 went to the local hospital where the SQ21 firefighter was later pronounced deceased. Photo 1: Side Alpha showing extrication operation, post collapse. (Courtesy of the fire department) REPORT F2025-03 • July 2025
Page ii Career Firefighter Dies after being Trapped by Collapse of Two Vacant Commercial Buildings – New York Report # F2025-03 Contributing Factors • Strategy and tactics • Wind-driven fire/structural collapse • Divisions/groups and incident safety officers (ISOs) • Rapid intervention team/crew • Personnel accountability system • Vacant buildings and arson Key Recommendations Fire departments should: • Establish and enforce collapse zones when a defensive strategy begins. • Educate fire officers and firefighters in building performance under fire conditions and the potential for structural collapse. • Establish divisions/groups with a supervisor or use multiple safety officers for fireground management and risk assessment at geographically complex scenes, as early in the incident as possible. • Ensure a rapid intervention team/crew is dedicated, assigned, and in place during structural firefighting operations to immediately respond to a firefighter emergency. • Use a personnel accountability system to identify the location and function of all operating personnel.
Governing municipalities (federal, state, regional/county, and local) should: • Ensure the delegated zoning or code enforcement authority, law enforcement agency, and fire department collaborate to proactively remediate vacant and abandoned buildings to reduce arson.
The National Institute for Occupational Safety and Health (NIOSH) initiated the Fire Fighter Fatality Investigation and Prevention Program to examine deaths of fire fighters in the line of duty so that fire departments, fire fighters, fire service organizations, safety experts and researchers could learn from these incidents. The primary goal of these investigations is for NIOSH to make recommendations to prevent similar occurrences. These NIOSH investigations are intended to reduce or prevent future firefighter deaths and are completely separate from the rulemaking, enforcement, and inspection activities of any other federal or state agency. Under its program, NIOSH investigators interview persons with knowledge of the incident and review available records to develop a description of the conditions and circumstances leading to the deaths in order to provide a context for the agency’s recommendations. The NIOSH summary of these conditions and circumstances in its reports is not intended as a legal statement of facts. This summary, as well as the conclusions and recommendations made by NIOSH, should not be used for the purpose of litigation or the adjudication of any claim. For further information, visit the program at www.cdc.gov/niosh/firefighters/fffipp/ or call 1-800-CDC-INFO (1-800-232-4636).
Career Firefighter Dies after being Trapped by Collapse of Two Vacant Commercial Buildings – New York
Page 1 REPORT F2025-03 • July 2025 Introduction On February 12, 2025, a career firefighter (SQ21 firefighter) died after being trapped by the collapse of two vacant commercial buildings. On February 13, 2025, the U.S. Fire Administration (USFA) notified the National Institute for Occupational Safety and Health (NIOSH) of this incident. On June 8 - 13, 2025, an investigator representing the NIOSH Fire Fighter Fatality Investigation and Prevention Program (FFFIPP) traveled to New York to investigate this incident. The NIOSH investigator conducted interviews with command officers, fire officers, firefighters, fire investigators, and other emergency personnel who were on-scene at the time of the incident. Also, the NIOSH investigator interviewed representatives of the zoning and code enforcement departments, law enforcement agency, and the county communications center. The investigator reviewed fire department standard operating guidelines (SOGs), training records, dispatch records, witness statements, and state agency investigation documents. Fire Department The career fire department in this incident has an 11.5 square mile jurisdiction, serves a population of 47,000 residents, annually responds to an average of 11,000 calls, and provides emergency medical services (EMS). The fire department has 117 uniformed personnel and maintains four shifts: A, B, C, and D. Each shift is staffed by a minimum of 21 personnel across five fire stations. Shifts operate on a 24-hour schedule from 08:00 to 08:00 the following day. Each shift is assigned a shift commander (assistant chiefs). The fire department’s leadership contains a fire chief, fire marshal, deputy chief, three assistant chiefs, a fire training instructor, eight captains, and 20 lieutenants. The fire department has five divisions: • Fire Suppression manages incident response. • EMS provides basic life support first response services and advanced life support transport at the paramedic level. • Special operations work land and water rescue as well as vehicle extrication and hazardous materials response. • Training runs a fire academy that provides initial, advanced, and routine training and certification programs. • Fire prevention leads activities such as fire code enforcement/inspection, fire investigation, and public education.
Page 2 Career Firefighter Dies after being Trapped by Collapse of Two Vacant Commercial Buildings – New York Report # F2025-03 Training, Education, and Professional Development The fire department maintains a training division that provides initial training and continual skills development for all firefighters, fire officers, and EMS personnel. The training division curriculum goes beyond the New York State required curriculum for career firefighters. Initial training for recruits consists of 18 weeks of daily academy training for a total of 720 hours. Recruits graduate with Pro Board® certifications for NFPA 1010 Fire Fighter I, Fire Fighter II as well as NFPA 470 Hazardous Materials/Weapons of Mass Destruction at the Operations level.
The IC (Car 21) had 25 years of fire service experience at the fire department. He held numerous certifications such as Pro Board® NFPA 1041 Fire Instructor I as well as New York State Basic Firefighter, Officer Level I, Instructor Level I, Municipal Fire Instructor, and EMT-Basic.
SQ21 firefighter had 11 years of fire service with the department. He held numerous certifications such as Pro Board® NFPA 1001 Fire Fighter I and Fire Fighter II as well as New York State paramedic. Apparatus, Staffing, and Communications At 21:39 hours, the following units were dispatched for a building fire (see Table 1):
Table 1. Units dispatched and arrival time Apparatus Staffing Arrival On-Scene Quint 21-2 (QT212) 5 21:42 Car 21 (IC) 1 21:42 Tower 21 (TW21) 4 21:42 Squad 21 (SQ21) 3 21:42 Quint 21-3 (QT213) 3 21:43 Engine 21-4 (EN214) 3 21:46
At the time of the incident, the county Public Safety Answering Point (PSAP) dispatched for seven EMS agencies, 33 fire departments, and eight law enforcement agencies. The PSAP was staffed by a supervisor and nine dispatchers per shift. The county used a UHF digitally trunked radio system with four designated dispatch talk groups (channels) for fire and EMS, one for each of the county’s four “battalions.” The fire department in this incident was dispatched on one talk group with four other fire departments that were assigned battalion 2. Tone alerting for all fire and EMS was handled on a separate paging talk group. Per PSAP protocols, all fireground communications were conducted on an operations talk group that was assigned by the PSAP. Like all talk groups on the system, the operations talk group was repeated and recorded. The PSAP had a primary dispatcher monitoring the dispatch talk group for every working fire. The operations talk group was monitored, when possible, in case of emergencies such as Maydays and “urgents.” Each fire officer and firefighter was given one portable radio with scan function.
All portable radios in the county had a programmed emergency alert button (EAB) to use when a firefighter was in immediate danger. The county’s protocol for EAB noted that upon activation, the portable radio
Page 3 Career Firefighter Dies after being Trapped by Collapse of Two Vacant Commercial Buildings – New York Report # F2025-03 would automatically switch to the emergency county talk group channel and result in an open mic for the firefighter to say their name, emergency, and location. Building Construction This incident involved two commercial buildings that were the end of a row next to a river, 1 and 3 Main (see Photo 2). Official zoning department records indicated that 3 Main was built around 1885 and was about 25 ft x 75 ft, with 1,875 square feet on the first floor, and another 1,875 square feet in the basement. It was wood frame construction with clapboard siding on Side Bravo and Side Charlie. It had a flat roof and a small parapet wall. The roof and floor joists were pocketed into the adjacent brick building, 5 Main (see Photo 3). The original post-in-ground foundation was replaced in 1949 with steel beams and concrete piers. The building originally was used for the commercial manufacturing of carriages. Over the years, it was remodeled and the storefront had two entrances on Side Alpha. There was also a stone facade, supported by a wood frame, that was added before 1992. In the 1940’s, three billboards were installed on the roof which spanned the length of the building. The billboards were present at the time of the incident.
Historical records indicated that 1 Main was built in 1938 as a wood frame addition to 3 Main to serve as a shoeshine shop. There was a shared doorway between both buildings. It was 24 ft x 21 ft, with 504 square feet on the first floor. 1 Main also had a small basement with steel beams and concrete piers as a foundation. It was remodeled with its storefront also having two entrances on Side Alpha. Both buildings had a sidewalk on Side Alpha and on-street parking. At the time of the incident, both 1 and 3 Main had most of their doors and storefront windows on Side Alpha boarded up with plywood.
Photo 2. The row of buildings in the incident in order from left to right: 1, 3, 5, 7, 9, and 11 Main. Red box shows 1 and 3 Main. (Courtesy of the fire department)
Page 4 Career Firefighter Dies after being Trapped by Collapse of Two Vacant Commercial Buildings – New York Report # F2025-03 Occupancy Status At the time of the incident, both 1 and 3 Main were registered as vacant buildings. The authority having jurisdiction (AHJ) maintains a vacant property registration program. Property owners annually register both residential and commercial properties as vacant with the AHJ if they are unoccupied for more than four months or in foreclosure. This program allows the AHJ to track vacant properties but assigns responsibility to the property owner to ensure the buildings are secured and maintained per New York State code. The program requires an exterior visual inspection of each vacant property by a code enforcement representative annually to ensure these responsibilities are met. When an inspection finds that a vacant building is unsecured, a certified letter is sent to the property owner that instructs them to secure the property within seven days. A code enforcement representative re-inspects the building after seven days to verify the building is secured. If it is not, a work order is entered for the AHJ’s parks department to board up and secure the building.
Inspections of 1 and 3 Main
Visual exterior inspections of both 1 and 3 Main were conducted in 2022 by code enforcement. 1 and 3 Main received violation notices for trash accumulation, other property maintenance issues, and the Photo 3. The pockets that were built into 5 Main that supported roof and floor joists of 3 Main. The image was taken post-fire. (Courtesy of the fire department)
Page 5 Career Firefighter Dies after being Trapped by Collapse of Two Vacant Commercial Buildings – New York Report # F2025-03 buildings being unsecured (see Photo 4). Per New York State code, the fire prevention division performed fire and life safety inspections once every three years for the type of commercial occupancy at 1 and 3 Main.
The last inspection for 1 Main was conducted in 2022 and results indicated that the building was unoccupied with structural issues observed, such as holes in the floor. Fire prevention division records showed that the building was last occupied in 2011 when it was used as a clothing retail store.
A joint inspection of 3 Main was performed on February 8, 2023, by code enforcement and fire prevention representatives when it was found to be unsecured. The roof joists and stairway of 3 Main were observed to be pulling out of the pockets of the brick wall of 5 Main with some of the joists being unsupported. Fire prevention division records showed that the building was last occupied in 2008 as a barber shop. Pre-Incident Hazard Identification The fire prevention division informed fire department personnel about the structural issue documented in 2023 by placing a “do not enter” electronic hazard notice for both 1 and 3 Main in the emergency response dispatch software. This software displayed a hazard marker on the map for the buildings to notify responding units of the hazard. The notes for this hazard notice indicated “unstable structure/floor.” Additionally, the fire prevention division communicated this hazard to shift personnel for awareness. At the time of the incident, the responding units were aware of the documented structural issues observed in 2023, informing firefighters to not enter either building for fire suppression operations. Incident Timeline The following timeline is a summary of events that occurred as the incident evolved on February 12,
- Not all incident events are included in this timeline. The times are to the minute and were taken
from the fire departments’ National Fire Incident Reporting System (NFIRS) fire reports, dispatch log, and interview notes. Photo 4. Side Charlie of 3 Main in 2022. (Courtesy of the fire department)
Page 6 Career Firefighter Dies after being Trapped by Collapse of Two Vacant Commercial Buildings – New York Report # F2025-03 Time Fireground Operations, Response, and Details February 12, 2025
21:37 Hours • PSAP received a 9-1-1 call for a fire in an abandoned building. 21:39 Hours • PSAP transmitted a full alarm assignment for a building fire. SQ21, QT212, QT213, TW21, EN214, and Car 21 were dispatched with operations assigned to talk group 3. 21:40 Hours • 7121 was in the area during dispatch. Upon hearing the PSAP, 7121 stopped at scene and provided a size-up confirming a working fire with heavy smoke and visible flames from 1 Main with extension to 3 Main. They requested QT212 respond to Side Charlie on arrival. 21:42 Hours • QT212, Car 21 (IC), TW21, and SQ21 arrived on-scene. • QT212 reported heavy smoke in the area, and believed the fire had possibly extended farther than 3 Main. QT212 officer went to Side Charlie and reported heavy fire in the basement and first floor of 1 Main and that he believed both buildings were vacant. • Car 21 established himself as IC and parked at the end of the row opposite of the bridge. He requested a 2nd alarm be transmitted and for spare apparatus to be staffed. He also requested fire investigators, a safety officer (SO21), and utility companies to be dispatched to the scene. • The off-duty assistant chiefs (CH21A, CH21B, and CH21D) went to the scene when they heard the 2nd alarm requested. • TW21 parked at the end of the bridge in anticipation of a defensive operation. • SQ21 pulled past TW21 and staged in the road in front of 3 and 5 Main. • SQ21 officer and TW21 officer had a face-to-face with the IC who ordered no entry into the buildings. He requested their crews to begin opening the doors and windows of the buildings for suppression. • SQ21 officer, backed up by SQ21 firefighter, prepared to flow water into 3 Main using a hoseline from SQ21. 21:43 Hours • The PSAP dispatched fire departments 26, 32, 35, and 59 to standby in their stations. 21:44 Hours • QT213 arrived on-scene and IC requested they deploy a hoseline to the Side Charlie/Side Delta corner for exposure protection. 21:45 Hours • 7121 officer returned to his apparatus and radioed the PSAP that he was proceeding to the local hospital with a patient they picked up prior to the incident. 21:47 Hours • IC requested the PSAP dispatch a mutual aid truck and engine to the scene as well as a 3rd alarm to staff spare apparatus. The PSAP dispatched Truck 59 and Engine 26-1.
Page 7 Career Firefighter Dies after being Trapped by Collapse of Two Vacant Commercial Buildings – New York Report # F2025-03 Time Fireground Operations, Response, and Details • EN214 arrived on-scene and prepared to establish a water supply from a hydrant to QT213. 21:48 Hours • IC announced a defensive strategy for operations and ordered all units to exit the buildings. He requested all apparatus driver/operators on-scene to sound their air horns to reinforce the change to a defensive strategy. He made the announcement first on talk group 3 then the dispatch channel. • QT212 officer immediately responded reporting that all occupants were evacuated from an adjacent building in the row. • The PSAP dispatched the 3rd alarm units. 21:51 Hours • IC reported a major collapse on Side Charlie on both talk group 3 and dispatch channels. • SQ21 firefighter was trapped under the fully intact collapsed facade on Side Alpha which spanned the sidewalk to a street parked car. • The Side Charlie collapse was confirmed by QT212 officer and was followed by an announcement from IC that a parapet had collapsed on Side Alpha. • Immediately following the collapse, IC requested a personnel accountability report (PAR) starting with QT212. 21:52 Hours • IC reported to the PSAP that there was a firefighter down on Side Alpha. 21:53 Hours • A Mayday was called with the PSAP sounding the emergency tones. • A QT212 firefighter at the collapsed facade activated their EAB. • IC requested all manpower to Side Alpha. • Multiple on-scene units were assigned to the extrication operation. 21:55 Hours • IC called an “urgent” on talk group 3 requesting all available manpower to Side Alpha to assist with the downed firefighter. 21:56 Hours • PSAP requested confirmation that either Chief 21 (CH21) or the IC received an additional Mayday (EAB activation) from QT212. • IC assigned CH21B to resolve the additional Mayday. 21:58 Hours • 7121 arrived back on-scene from the local hospital and was requested by IC to report to Side Alpha to assist with the downed firefighter. • A firefighter radioed on talk group 3 that they needed a line on the fire on Side Alpha. • IC and a QT212 firefighter grabbed hoselines and TW21 directed its master streams to the fire of 3 Main to protect the extrication operations. 21:59 – 22:02 Hours • CH21B advised the PSAP that the Mayday was for the firefighter that was trapped by the collapse that they are working to extricate. • IC requested PAR from QT212 who responded that they were working on the down firefighter. • PSAP sounded emergency tones stating there was a second Mayday from QT212 (EAB activation).
Page 8 Career Firefighter Dies after being Trapped by Collapse of Two Vacant Commercial Buildings – New York Report # F2025-03 Personal Protective Equipment At the time of the incident, SQ21 firefighter was wearing full structural firefighting turnout gear and a NIOSH Approved® self-contained breathing apparatus (SCBA). No evidence was identified to suggest that the structural firefighting turnout gear or SCBA contributed to the fatality. Weather Conditions At 21:39 hours on February 12, 2025, the outdoor temperature was 25°F, dewpoint was 16°F, the wind was out of the southeast at 16 mph, and conditions included light snow [Weather Underground 2025]. Time Fireground Operations, Response, and Details • IC again requested PAR from QT212 who responded they were working on the down firefighter. 22:03 Hours • IC requested a status from QT213 on Side Charlie who responded that the fire was somewhat knocked down and they were getting ready to open 5 Main to look for fire extension. 22:12 Hours • IC notified the PSAP that QT212 had PAR, and their Mayday was for the member of SQ21 that they were working to extricate. • The facade was lifted by the SQ21 driver/operator using spreaders and a QT212 firefighter using a combination tool. This provided room for crews to pull SQ21 firefighter out towards the building. 22:13 Hours • CH21A notified IC that SQ21 firefighter was fully extricated from under the facade. The PSAP acknowledged that extrication was complete. • SQ21 firefighter was placed on a stretcher and loaded into 7121 while fire investigator 21-2 (FI212) performed CPR and 7121 crew provided advanced life support care. • 7121 departed the scene to the local hospital where SQ21 firefighter was later pronounced deceased. 22:15 – 22:18 Hours • IC requested a progress report from TW21 who responded that there was still heavy fire because of the wind. QT213 reported that they were holding the fire on Side Charlie. • IC initiated a PAR check for all on-scene units with all units confirming PAR. February 13, 2025
00:43 Hours • The fire was declared under control with on-scene units working on hot spots. 16:59 Hours • All units cleared the scene.
Page 9 Career Firefighter Dies after being Trapped by Collapse of Two Vacant Commercial Buildings – New York Report # F2025-03 Investigation At approximately 21:37 hours, the county PSAP received a 9-1-1 call from an occupant of a nearby residence reporting a fire in an abandoned building. At 21:39 hours, the PSAP transmitted a full alarm assignment for the reported building fire around the intersection at Main and Front. SQ21, QT212, QT213, TW21, EN214, and Car 21 were dispatched and assigned talk group 3. While units were enroute, crews in both SQ21 and TW21 discussed their knowledge of the deteriorated conditions of 1 and 3 Main. Officers of each apparatus informed their crews that no one enter the buildings.
At the time of dispatch, 7121 was transporting a patient to the local hospital and just entered the bridge headed towards the front of 1 Main. 7121 parked on the side of the road after clearing the bridge to investigate and provided a scene size-up. The 7121 officer walked up to 1 Main and observed smoke coming out of the boarded up windows on Side Alpha. The smoke billowed out of the boarded windows as if the building was charged with smoke. He walked onto the bridge and observed flames breaking through Side Bravo of 1 Main and heavy smoke coming from Side Charlie of 3 Main. The 7121 officer provided a detailed size-up of his observations to the PSAP that confirmed the working fire in 1 Main extended into 3 Main. He requested QT212 respond to Side Charlie on arrival. As he returned to Side Alpha, dark grey smoke from 1 Main became so heavy and banked down that he could no longer see his apparatus parked across the street (see Photo 5). The severe smoke conditions were caused by strong winds coming off the river. These winds blew into both buildings, advancing the situation to a wind- driven fire.
Photo 5. Example of smoke condition on Side Alpha. (Courtesy of the fire department)
Page 10 Career Firefighter Dies after being Trapped by Collapse of Two Vacant Commercial Buildings – New York Report # F2025-03 At 21:42 hours, QT212, Car 21 (IC), TW21, and SQ21 arrived on-scene. QT212 parked at the intersection at the end of the row opposite the bridge and reported heavy smoke in the area, believing the fire had possibly extended farther than 3 Main. Their crews received reports of elderly occupants that needed assistance to evacuate the buildings next to 3 Main. The crews broke into two teams. The QT212 officer went to Side Charlie and assessed conditions. He reported heavy fire in the basement and first floor of 1 Main (see Photo 6). He also reported that he believed both buildings were vacant and requested hoselines to Side Charlie. The other QT212 crew assisted police officers with evacuating the occupants of the other buildings in the row.
Car 21 established himself as the IC and parked at the end of the row opposite the bridge. He requested a 2nd alarm be transmitted and for spare apparatus to be staffed. He also requested fire investigators, SO21, and utility companies to be dispatched to the scene. He walked along the row to the bridge and assessed conditions on Side Alpha of each building. When he was at the bridge, he noted that the buildings were hard to see because of the amount of smoke present. The off- duty assistant chiefs went to the scene when they heard the 2nd alarm requested.
Seeing the heavy smoke, the TW21 officer had the driver/operator park at the end of the bridge in anticipation of a defensive operation. SQ21 pulled past TW21 and staged in the road in front of 3 and 5 Main. The SQ21 officer and the TW21 officer had a face-to-face with IC who ordered no entry into the buildings. He requested their crews begin opening the doors and windows of the buildings for fire suppression. TW21 crews were unable to remove the plywood of 1 Main with hand tools. A TW21 firefighter retrieved a chainsaw and began cutting holes in the plywood. The SQ21 officer observed police officers trying to open 3 Main. He started removing the plywood on the windows and doors with hand tools while the SQ21 driver/operator and the SQ21 firefighter stretched a 1 ¾-inch hoseline around the parked cars to the front of 3 Main. The TW21 firefighter cut a hole in the plywood the SQ21 officer was working on. The SQ21 officer, backed up by the SQ21 firefighter, began flowing water into 3 Main. The SQ21 officer did not observe any active fire in 3 Main but believed the fire was in the basement. He continued to flow water, periodically stopping to evaluate conditions.
The PSAP dispatched fire departments 26, 32, 35, and 59 to standby in their stations. IC radioed EN214 and asked if they were on-scene yet. When QT213 arrived on-scene, IC requested they deploy a hoseline Photo 6. Conditions on Side Charlie upon arrival of QT212. (Courtesy of the fire department)
Page 11 Career Firefighter Dies after being Trapped by Collapse of Two Vacant Commercial Buildings – New York Report # F2025-03 to the Side Charlie/Side Delta corner for exposure protection. QT213 crews deployed 300 feet of 1 ¾- inch hoseline to Side Charlie of 3 Main which was fully involved. The QT213 officer had crews deploy an additional 2 ½-inch hoseline after seeing the volume of fire. The QT212 officer reported on talk group 3 that his crew was evacuating occupants from 5 Main out through the exterior stairs of Side Charlie. EN214 radioed IC stating they were almost on-scene and asked if he wanted them to establish a water supply. IC responded requesting their location and gave orders for EN214 to establish a water supply to QT213. The 7121 officer returned to his apparatus and radioed the PSAP that he was proceeding to the local hospital with their patient.
IC requested the PSAP to dispatch a mutual aid truck and engine to the scene and a 3rd alarm. He requested the QT212 driver/operator establish a water supply to TW21. As QT213 performed fire suppression on Side Charlie of 3 Main, EN214 arrived on-scene and prepared to establish a water supply from a hydrant. While at the same time, a QT212 firefighter deployed 300 feet of 1 ¾-inch hoseline to Side Alpha from QT212.
At 21:48 hours, IC announced a defensive strategy for operations and ordered all units to exit the buildings. He requested all apparatus driver/operators on-scene to sound their air horns to reinforce the change to a defensive strategy. He made the defensive strategy announcement first on talk group 3 then on the dispatch channel. The QT212 officer immediately responded reporting that all occupants had been evacuated from an adjacent building in the row. The PSAP dispatched the 3rd alarm units. Hearing the order from IC and the QT212 officer’s response, the SQ21 officer and other firefighters on Side Alpha assumed the order was for interior crews that were in adjacent buildings evacuating occupants. IC requested TW21 crews set up the aerial ladder as the SQ21 driver/operator began to deploy a 2 ½-inch hoseline.
IC requested QT213 and EN214 to deploy a blitz gun to Side Charlie to protect exposures. EN214 secured the water supply to QT213 while firefighters from QT212 and QT213 added EN214’s blitz gun to the deployed 2 ½-inch hoseline. CH21A and SO21 arrived on-scene. IC radioed on the dispatch channel asking if any chief officers were on-scene. CH21A responded that he was on-scene and IC ordered him to Side Charlie to manage the exposure protection operations. SO21 had a face-to-face with IC who requested he also stage on Side Charlie. The QT212 driver/operator completed the water supply to TW21 who began operating two master streams from the bucket into the fire of 1 Main. Fire ambulance 7121 was requested to return to the scene as they left the local hospital. At this time, the SQ21 officer told the SQ21 firefighter that their suppression operations weren’t working and they needed to regroup. The SQ21 firefighter began to walk away from the front of 3 Main towards Side Delta. The SQ21 officer then dropped the 1 ¾-inch hoseline and followed.
At 21:51 hours, IC reported a major collapse on Side Charlie on both talk group 3 and dispatch channels. 3 Main experienced a progressive collapse that started when the roof failed and caused the billboards to drop (see Photo 7 and 8). This caused the Side Bravo wall to fall outward and push the walls of 1 Main. This also caused the facade on Side Alpha to collapse outwards onto the sidewalk toward the street parked cars. The SQ21 firefighter was trapped under the fully intact facade which spanned the sidewalk to a street parked car. His head to his diaphragm were covered by building materials. His waist, one arm, and legs were exposed through a window frame. The SQ21 officer was hit in the head by the facade,
Page 12 Career Firefighter Dies after being Trapped by Collapse of Two Vacant Commercial Buildings – New York Report # F2025-03 knocking off his helmet. The collapse caused zero visibility conditions on Side Alpha; some smoke conditions occasionally improved because of shifting winds. The Side Charlie collapse was confirmed by the QT212 officer and was followed by an announcement from IC that a parapet had collapsed on Side Alpha. Immediately following the collapse, IC requested a PAR starting with QT212. IC did not witness the facade collapse onto the SQ21 firefighters because of the severe smoke conditions.
CH21D arrived on-scene. A TW21 firefighter and the SQ21 driver/operator notified IC that the SQ21 firefighter was trapped under the facade. IC reported to the PSAP that there was a firefighter down on Side Alpha. The PSAP requested confirmation from IC that there was a firefighter down on Side Alpha. This transmission was followed by a Mayday with the PSAP sounding the emergency tones. The PSAP attempted to contact the Mayday firefighter twice with no response. Since the firefighter calling the Mayday had their transmissions being stepped on, a QT212 firefighter at the collapsed facade activated their EAB. IC then requested all manpower to Side Alpha and QT212 crews from Side Charlie made their way to Side Alpha through a building in the row. CH21A was assigned to lead the extrication operation. As EN211 arrived on-scene they reported to IC, who requested they assist with extricating the SQ21 firefighter. Along with crews from QT212 and SQ21, they began the operation by attempting to lift the facade, but it was too heavy. Crews also attempted to pull SQ21 firefighter by his lower body which was exposed through the window frame. This was also unsuccessful.
Photo 7 and 8. Progressive collapse of 3 Main showing the billboard drop and pushing out the Side Bravo wall. (Courtesy of the fire department)
Page 13 Career Firefighter Dies after being Trapped by Collapse of Two Vacant Commercial Buildings – New York Report # F2025-03 7121 went to the scene from the local hospital as FI212 arrived on-scene. IC requested that EMS bring a stretcher to Side Alpha. A QT213 firefighter reported to IC that the “single-story” building only had part of the Side Alpha and Side Bravo walls left standing. This was followed by IC calling an “urgent” on talk group 3 and requesting all available manpower to Side Alpha to assist with the downed firefighter. The SQ21 officer responded requesting a saw to Side Alpha for crews working the extrication to cut the facade frame apart (see Photo 9).
The PSAP requested confirmation that either CH21 or the IC received an additional Mayday (EAB activation) from QT212. CH21 responded noting that he was not on-scene and could not confirm. IC assigned CH21B to resolve the additional Mayday. He began to search for QT212 officer to verify they had PAR. When 7121 arrived on-scene, IC requested they report to Side Alpha to assist with the downed firefighter. Upon acknowledging their arrival report, the PSAP requested that 7121 confirm with IC that they were aware of the Mayday from QT212. IC responded by requesting a PAR from QT212 as the 7121 officer staged a stretcher by the collapsed facade on the street side of the parked cars. A firefighter radioed on talk group 3 that they needed a line on the fire on Side Alpha (see Photo 10). Following the collapse, the wind began to blow direct heavy smoke, heat, and fire over the edge of the sidewalk towards the facade and extrication operations. IC and a QT212 firefighter grabbed hoselines and TW21 directed its master streams to the fire of 3 Main to protect the extrication operations. The EN214 driver/operator established a water supply to SQ21 which was running low on tank water. Crews switched out operating the hoselines to protect the extrication operation from smoke, heat, and flames.
Photo 9. The collapsed facade on Side Alpha. (Courtesy of the fire department)
Page 14 Career Firefighter Dies after being Trapped by Collapse of Two Vacant Commercial Buildings – New York Report # F2025-03
CH21B advised the PSAP that the Mayday was for the firefighter trapped by the facade, who they were working to extricate. The PSAP acknowledged while IC requested PAR from QT212. QT212 responded that they were working on the downed firefighter. A firefighter requested water on the fire on Side Alpha. This transmission was followed by emergency tones from the PSAP about a second Mayday from QT212 (EAB activation). The PSAP requested confirmation from IC that they were aware of the second Mayday. CH21B confirmed as fire investigator 21-3 (FI213) arrived on-scene. Crews began to use chainsaws to cut the wood frame of the facade. One chainsaw kept stalling from the amount of smoke while the other would not cut the material of the wall. Again, IC requested PAR from QT212 who responded they were working on the downed firefighter. IC requested confirmation that QT212 knew where all its firefighters were. IC requested a status from QT213 on Side Charlie who responded that the fire was somewhat knocked down and they were getting ready to open 5 Main to look for fire extension. IC requested TW21 stop their master streams as they were working against the extrication operations.
EN219 and SQ219 arrived on-scene and were assigned to assist with the extrication operations by staging tools. IC notified the PSAP that QT212 had PAR, and their Mayday was for the member of SQ21 that they were working to extricate. The SQ21 driver/operator used spreaders and a QT212 firefighter used a combination tool to lift the facade together. This provided enough room for crews to pull the SQ21 firefighter out towards the building. At 22:13 hours, CH21A notified IC that the SQ21 firefighter was fully extricated from under the facade. The PSAP acknowledged that extrication was complete. The SQ21 firefighter was placed on a stretcher and loaded into 7121 while FI212 performed CPR and the 7121 crew provided advanced life support care. IC requested the PSAP to notify the local Photo 10. View of fire that became wind-driven from bridge with master streams and hoseline attempting to protect the extrication operation. (Courtesy of the fire department)
Page 15 Career Firefighter Dies after being Trapped by Collapse of Two Vacant Commercial Buildings – New York Report # F2025-03 hospital of the SQ21 firefighter being transported to them. 7121 went to the local hospital where the SQ21 firefighter was later pronounced deceased.
IC requested a progress report from TW21 who responded that there was still heavy fire because of the wind. QT213 reported that they were holding the fire on Side Charlie. IC then initiated a PAR check for all on-scene units with all confirming PAR. At this time, IC was transferred to CH21D, and on-scene units were rotated off. Multiple firefighters were treated for smoke inhalation because they worked the extrication operation without an SCBA.
The next day, the fire was declared under control with on-scene units still working on hot spots. All units cleared the scene that afternoon. Three firefighters were evaluated at a local hospital for smoke inhalation, an overexertion injury, and head injuries.
The fire department created a peer support program three years ago. After the incident, the fire department activated their internal peer support team for those who responded to this incident. The availability of the peer support team and its mental health resources were communicated to the department personnel via email, text message, word-of-mouth, and through the supervisory chain. The resources were also available to spouses and children of responding personnel. Fire Origin and Cause The State cause and origin investigation determined that the fire started in 1 Main and was classified as arson. The fire was believed to have been started by an individual experiencing homelessness. Cause of Death According to the county coroner report, the cause of death of the SQ21 firefighter was traumatic asphyxiation. Contributing Factors Occupational injuries and fatalities are often the result of one or more contributing factors or key events in a larger sequence of events that ultimately result in injuries or fatalities. The NIOSH investigator identified the following items as key contributing factors in this incident that ultimately led to the fatality: • Strategy and tactics • Wind-driven fire/structural collapse • Divisions/groups and ISOs • Rapid intervention team/crew • Personnel accountability system • Vacant buildings and arson
Page 16 Career Firefighter Dies after being Trapped by Collapse of Two Vacant Commercial Buildings – New York Report # F2025-03 Recommendations Recommendation #1: Fire departments should establish and enforce collapse zones when a defensive strategy begins. In this incident, the IC announced a defensive strategy for operations and ordered all units to exit the buildings three minutes before the collapse. He requested all apparatus driver/operators on-scene sound their air horns to reinforce the change to a defensive strategy (i.e., exterior fire control). The QT212 officer immediately responded, reporting that all occupants had been evacuated from an adjacent building in the row. Hearing the order from IC and the QT212 officer’s response, the SQ21 officer and other firefighters interviewed by NIOSH assumed the order was only for interior crews in adjacent buildings who were evacuating occupants. A collapse zone was not established or enforced by the IC, company officers, or ISO prior to the collapse.
In a defensive operation, the IC should make a reasonable determination of what the fire may consume and where it can be stopped. The IC should acknowledge that if the fire has significantly strengthened, some or all of the building may be lost. This determination should be based on the fire department’s capability to extinguish the fire without placing firefighters in unnecessary risk. Conducting a thorough scene size-up and deploying effective tactics on what can be saved and where the fire can be stopped minimizes losses [NIOSH 2025a]. NFPA 1700 states that abandoned or vacant structures are often in an unknown state of condition or compromise, which could result in weakened structural components, holes in floors, and structural deficiencies. When controlling fires in these structures, a defensive strategy should be considered to avoid entry, and early collapse should be anticipated. Structural deficiencies in these buildings may result in unpredictable and increased fire activity [NFPA 1700 2021]. A decision for a defensive strategy is based on the incident’s hazards outweighing the ability to safely operate inside the structure. Recognizing and defining collapse signals and risk through exclusion and control zones are fundamental to collapse zone management principles [NIOSH 2014]. Clear announcement of a defensive strategy is crucial as it helps all responders understand the IC’s goal (control the spread from the outside) [NIOSH 2025a]. When the structure is visibly unstable, a collapse zone equal to one and a half times the height of the building should be established at minimum [NFPA 1550 2024]. This perimeter size keeps firefighters and other personnel out of imminent danger in the event of a collapse. When a collapse zone is established, the IC should communicate a “no re-entry” strategy until otherwise directed [NIOSH 2008]. The IC, with the help of the ISO(s), should define, establish, and enforce collapse areas. Once in place, the IC must clearly communicate where the collapse area(s) is/are to all firefighters operating on the fireground. The IC, division/group supervisors, and company officers should ensure firefighters do not enter the collapse areas. Preventing deviance from the strategy requires communication with everyone on the fireground, including the dispatcher and other responding units [NIOSH 2025b]. Recommendation #2: Fire departments should educate fire officers and firefighters in building performance under fire conditions and the potential for structural collapse. At this incident, the majority of responding personnel knew that the condition of the incident buildings were vacant and deteriorated. Some crews decided while enroute that no one would enter them for
Page 17 Career Firefighter Dies after being Trapped by Collapse of Two Vacant Commercial Buildings – New York Report # F2025-03 interior operations. Recognizable characteristics of a wind-driven fire were present based on smoke conditions and fire behavior. Due to their single-story structure, many of the firefighters interviewed by NIOSH expressed they did not predict the buildings to fail so quickly.
Understanding a building’s design and structural anatomy, construction methods and materials, and vulnerabilities under fireground conditions has been linked to safer firefighting operations and firefighter survivability [NIOSH 2013]. Knowledge of building construction is critical to help firefighters recognize the potential for structural collapse. During the growth stage, the fire consumes combustible structural members. During the decay stage and post-suppression activities, the structure is further weakened due to the poor state of remaining structural members and the buildup of water. The contents of a building, such as furniture or machinery, also contribute to the potential for structural collapse by [IFSTA 2015; NIOSH 2025b]: • Adding fuel load into the structure and generating higher temperatures that weaken structural components. • Adding weight to the weakened structural members. • Retaining water, which increases weight of contents and applies more stress on the structural members. The progressive collapse of 3 Main resulted in the stone facade on Side Alpha falling straight out as a unit. Exterior masonry and veneer walls are not load-bearing. They are attached with ties and supports to the structure [IFSTA 2013]. When the load-bearing walls of 3 Main failed due to the collapse, the weight of and imposed load from the stone on the facade pulled it straight out onto the sidewalk. It is important for firefighters to be aware of how masonry or stone veneer construction influence the potential for structural collapse. The term “wind-driven” fire is used to describe a fire in which the wind has the potential to, or is already causing, a dramatic and sudden increase in fire, heat, and smoke conditions. When responding to a reported structure fire, an overriding consideration concerning size-up must be wind conditions and their potential effect on the fire. The key to successfully operating at wind-driven fires depends on recognizing the wind-impacted fire conditions that may change a seemingly routine fire into a “blowtorching” fire [NIOSH 2016]. At this incident, the poor structural condition of the buildings, including multiple openings paired with the wind from the Side Bravo/Side Charlie corner facilitated rapid fire growth. This led to a quicker structural failure of the buildings. Fire officers and firefighters should be trained to consider building performance under fire conditions, such as wind-driven fires, to better recognize the potential for structural collapse and adjust tactics as applicable. Recommendation #3: Fire departments should establish divisions/groups with a supervisor or use multiple safety officers for fireground management and risk assessment at geographically complex scenes, as early in the incident as possible. This incident involved a geographically complex scene with a row of buildings near a river. The fire department in this incident used the training division instructor (SO21) as the designated ISO. The ISO
Page 18 Career Firefighter Dies after being Trapped by Collapse of Two Vacant Commercial Buildings – New York Report # F2025-03 only responds when requested by the IC. At the time of this incident, SO21 was off-duty and responded from home. He arrived on-scene two minutes before the collapse. As the incident escalates and additional alarms are requested, the span of control must be expanded to maintain effective command and coordination of the incident. This tactical-level management can be supported by establishing divisions or groups to direct operations in specific geographic areas or manage incident functions [IFSTA 2015]. Within a division/group, firefighters advise their supervisor of work progress and provide accountability for crew members engaging in task level activities. The IC should assign divisions/groups to a supervisor early. This is especially important when firefighters are operating from tactical positions that the IC has little or no direct control over (e.g., out of sight). All requests for additional resources or assistance within a division/group are directed to the supervisor who is responsible for communicating with the IC. Supervisors can provide ongoing conditions, actions, needs (CAN) reports to the IC of all four sides and the interior of an incident which may influence tactics and strategy [SKCFTC 2023]. Division/group supervisors can also assist in providing PARs when requested by the IC, ISO, or operations. Tactical-level management at geographically complex scenes can also be accomplished by using multiple safety officers. The ISO provides a fire department with a higher level of expertise to perform the necessary incident scene functions and assist the IC with fireground safety. An ISO can perform initial and ongoing size-ups throughout the incident. Expectations and authority for the ISO include determining hazardous incident conditions, advising the IC to modify control zones or tactics to address corresponding hazards, communicating fire behavior and forecasting growth, and estimating building/structural collapse hazards. The ISO also has the authority to stop or suspend incident operations based on imminent threats to firefighter safety [NFPA 1550 2024]. The ISO should be separate from the IC, operations, or accountability positions so they can focus on their responsibilities and the primary objective of continually assessing all on-scene hazards to firefighter life and safety [NIOSH 2025b].
Larger fire departments can consider having one or more full-time dedicated ISOs who are on duty and can routinely respond to working fires (e.g., full-time shift ISOs). This can include increasing staffing to fulfill this role. In smaller departments, every officer should have the ability to function as the ISO when assigned by the IC [NIOSH 2025c]. Whether the ISO position is predesignated or filled by a fire officer, ISOs should be trained in how to assist the IC and other officers in fireground operations. While a fire department may use an appointed officer as an ISO, they may be delayed in recognizing a hazardous situation or operation. This delay can be mitigated by training all individuals who may be appointed as an ISO, to ensure they have clear understanding of responsibilities and expectations if deemed necessary [Dodson 2021; Sullivan 2012; NIOSH 2013]. Specific to this incident, the IC might have considered the use of multiple or assistant ISOs for fireground management and risk assessment at such a geographically complex scene. Incidents at large geographical areas such as commercial buildings or scenes with access issues that hamper the ability to do a 360 (e.g., riverside, row of buildings) often require expansion of the ISO role. Consequently, assigning assistant ISOs into branches, divisions, or groups for specific areas of responsibility (e.g. Side Charlie) might be necessary [NIOSH 2016].
Page 19 Career Firefighter Dies after being Trapped by Collapse of Two Vacant Commercial Buildings – New York Report # F2025-03 Recommendation #4: Fire departments should ensure a rapid intervention team/crew is dedicated, assigned, and in place during structural firefighting operations to immediately respond to a firefighter emergency. The fire department in this incident used the 7121 crew as their assigned rapid intervention team (RIT) for working fires. The 7121 crew would collect the RIT equipment stored in Car 21 and stage it at the scene. At this incident, 7121 was the first arriving unit. On arrival, the IC observed 7121 on-scene and believed those crews were there for RIT assignment. However, 7121 departed the scene for the local hospital with the patient they had from a previous call for service. No RIT was present on-scene at the time of the collapse or extrication operation. Effective RIT operations are dependent on being proactive. On arrival, the RIT officer with one member of the RIT, receives a report from the IC. This report informs the RIT of on-scene details before they perform an incident scene survey to complete their evaluation. The remaining RIT members assemble the RIT equipment. After these tasks are completed and the RIT equipment is in place, the RIT officer informs the IC that a scene survey is complete and the RIT is ready, if needed. The entire RIT should stay immediately accessible for rapid deployment and maintain radio contact with the IC. The RIT officer should brief all RIT members with results of the incident scene survey [Toledo Fire & Rescue Department 2012]. The RIT officer and members coordinate with the IC to form rescue plan contingencies and to monitor radio and fireground conditions. RIT protection is an active assignment. This is an ongoing process of comprehensive information gathering and diligent scene monitoring until the unit is released by the IC [NIOSH 2024; NIOSH 2025d; NFPA 1407 2020]. RIT personnel should be qualified with operations level training of structural collapse search and rescue, as established in NFPA 2500. This includes being able to perform tasks such as conducting hasty primary and secondary search operations (low and high coverage) to locate victims trapped on, inside, and beneath collapse debris; accessing victims trapped inside and beneath collapse debris; and performing extrication operations involving packaging, treating, and removing victims trapped within and beneath collapse debris [IFSTA 2019; NFPA 2500 2022]. In terms of this incident, the RIT equipment was not staged and ready for use during the extrication operation, this includes appropriate tools based upon conditions present. RIT equipment not only includes lifesaving resources such as spare SCBA cylinders within RIT kits, but also forcible entry, cutting, and striking tools. This may include battery-powered chainsaws that are unaffected by the smoke conditions present on Side Alpha when crews attempted to cut the facade [IFSTA 2019]. Recommendation #5: Fire departments should use a personnel accountability system to readily identify the location and function of all operating personnel. At this incident, the IC was not able to maintain accountability of on-scene personnel because of smoke conditions on Side Alpha and the geographically complex scene. Additionally, the multiple Maydays and PAR attempts for QT212 could not be resolved in a timely manner. A personnel accountability system is a system that identifies the location and function of all members operating at an incident scene [NFPA 1550 2024]. This system is activated during an incident to collect
Page 20 Career Firefighter Dies after being Trapped by Collapse of Two Vacant Commercial Buildings – New York Report # F2025-03 and maintain the status and location of personnel that may be working in an immediately dangerous to life and health environment. All personnel operating at an incident are responsible for understanding and participating in this system. The IC is responsible for all personnel but may delegate certain responsibilities to another person such as the ISO. An integral part of the accountability system is to make sure that the firefighters who are assigned and operating in the hazard zone are accounted for throughout the entire incident. A properly initiated and enforced personnel accountability system can improve firefighter safety and survival [NIOSH 2024]. A functional personnel accountability system can identify [NIOSH 2025e]: • Members operating in the hazard zone • Where members are in the hazard zone • Conditions in the hazard zone • Actions used in the hazard zone • Paths of access and egress in and out (i.e., exits) of the hazard zone • Rapid intervention teams/crews and their assignments
Different methods and tools are available for resource accountability, including [NIOSH 2025e]: • Tactical worksheets • Command boards • Apparatus riding lists • Company responding boards • Electronic bar-coding systems • Accountability tags or keys
Completion of personnel accountability can be assigned to a staff aide (e.g. incident command technician) by the IC. Functions of the staff aide include maintaining the tactical worksheet; maintaining personnel accountability of all members operating at the incident (resource status and situation status); monitoring radio communications on the dispatch and operations channels; control information flow; and accessing reference material and pre-incident plans. Some fire departments use firefighters as staff aides and other fire departments use fire officers to serve as a staff aide for a command officer. This position can be appointed, or fire departments can consider increasing staffing to fulfill this position [NIOSH 2016; NIOSH 2025d].
Recommendation #6: Governing municipalities (federal, state, regional/county, and local) should ensure the delegated zoning or code enforcement authority, law enforcement agency, and fire department collaborate to proactively remediate vacant and abandoned buildings to reduce arson. In this incident, the AHJ maintained a vacant property registration program that provided contact information and generated fees to cover municipal costs associated with these properties. This included a vacant property officer who interacted with owners and municipal departments, emphasizing compliance more than enforcement. At the time of the incident, there were more than 350 vacant properties registered with the AHJ. The fire department in this incident generally responds to 10 or more fires annually in vacant and abandoned buildings.
Page 21 Career Firefighter Dies after being Trapped by Collapse of Two Vacant Commercial Buildings – New York Report # F2025-03 Many fire departments have vacant/abandoned/derelict (high-risk) structures in their jurisdictions. These types of buildings are of increasing concern to the life and safety of firefighters. These structures lack structural integrity and may contain unknown hazards [USFA 2023]. The best way to prevent vacant building fires is to reduce or eliminate vacant (i.e., high-risk) buildings. However, most fire departments lack the necessary legal standing or resources to carry out the demolition of a building. So, it is critical for them to form strategic partnerships with zoning, code enforcement, and law enforcement agencies of their AHJ to develop and implement strategies for timely remediation of these buildings [NIOSH 2025a].
After vacant and abandoned buildings have been identified, the fire department should work with the AHJ to remediate them by securing all entrances or demolition. Preventing unauthorized individuals from entering a building can reduce the risk of a fire igniting and arson. Securing the building might include physical barriers to deny access [NIOSH 2025a]. The effectiveness of physical barriers should be evaluated during building inspection. Once secured, buildings must be patrolled with regular frequency to make sure they remain secure. High visibility of law enforcement patrols can also be an effective control in deterring unauthorized access [USFA 2023].
The National Vacant Properties Campaign describes several strategies to address the problem of vacant properties and provides examples of how these strategies have been used. Strategies include [National Vacant Properties Campaign 2024]:
• Land banks for property seized from nonpayment of taxes • Rehabilitation programs for owner-occupied housing and home repair programs • Information systems to capture data about individual properties and neighborhoods that allow developing problems to be identified, tracked, and addressed • Property maintenance codes related to occupied housing that reduce the likelihood a property falls into serious disrepair and abandonment • Nuisance abatement authority that allows municipalities to address threats to the general public, typically, through administrative hearings rather than courts • Receivership, which is legal action that places property in dispute under the control of an independent person (e.g., court-appointed neutral party) Post-Incident Fire Department Prevention Actions After this incident, the fire department implemented changes to its incident response and fireground operations. These changes were based on the department’s critique of the incident on February 12, 2025.
• Collapse hazards in CAD data: Vacant and derelict buildings that have response hazards identified from inspections and crew observations are now recorded in the fire department’s CAD data to ensure that arriving units have additional information on incident buildings prior to arrival. • Building Owner Remediation:
Page 22 Career Firefighter Dies after being Trapped by Collapse of Two Vacant Commercial Buildings – New York Report # F2025-03 When the fire prevention division identifies fire and life safety code violations at commercial buildings, the fire marshal’s office issues violation notices for building owners to appear in court if the code violations are not remedied. This includes vacant buildings. References Dodson D [2021]. Fire department incident safety officer, 3rd Ed. Burlington, MA: Jones & Bartlett Learning. IFSTA [2013]. Essentials of fire fighting. 6th ed. Stillwater, OK: International Fire Service Training Association.
IFSTA [2015]. Fire and emergency services safety officer. 2nd ed. Stillwater, OK: International Fire Service Training Association.
IFSTA [2019]. Rapid intervention teams. 2nd ed. Stillwater, OK: International Fire Service Training Association.
National Vacant Properties Campaign [n.d.]. Strategies and technical tools. Date accessed: June 13, 2025.
NFPA [2020]. NFPA 1407, Standard for training fire service rapid intervention crews. Quincy, MA: National Fire Protection Association. NFPA [2021]. NFPA 1700, Guide for structural fire fighting. Quincy, MA: National Fire Protection Association.
NFPA [2022]. NFPA 2500, Standard for operations and training for technical search and rescue incidents and life safety rope and equipment for emergency services. Quincy, MA: National Fire Protection Association. NFPA [2024]. NFPA 1550, Standard for emergency responder health and safety. Quincy, MA: National Fire Protection Association. NIOSH [2008]. Career fire fighter dies when trapped by collapsed canopy during a two alarm attached garage fire – Pennsylvania. By Koedam R, Merinar T, and Kovacevic L. Morgantown, WV: U.S. Department of Health and Human Services, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health, F2007-08. NIOSH [2013]. Career lieutenant and fire fighter killed and two fire fighters injured by wall collapse at a large commercial structure fire - Pennsylvania. By Miles S., Bowyer M., Merinar T., Tarley J., and Loflin M. Morgantown, WV: U.S. Department of Health and Human Services, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health, F2012-13.
Page 23 Career Firefighter Dies after being Trapped by Collapse of Two Vacant Commercial Buildings – New York Report # F2025-03 NIOSH [2014]. Preventing deaths and injuries to fire fighters by establishing collapse zones at structural fires. Cincinnati, OH: U.S. Department of Health and Human Services, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health (NIOSH), Publication No. 2014-120. NIOSH [2016]. Lieutenant and fire fighter die and 13 fire fighters injured in a wind-driven fire in a brownstone – Massachusetts. By Bowyer ME, Loflin ME, and Miles ST. Morgantown, WV: U.S. Department of Health and Human Services, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health, F2014-09. NIOSH [2024]. Volunteer firefighter killed after becoming trapped at an assisted living facility fire and two firefighters injured – New York. By Loflin M and Attwood W. Morgantown, WV: U.S. Department of Health and Human Services, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health, F2021-10. NIOSH [2025a]. Three firefighters die and another seriously injured during the collapse of an abandoned, derelict, 3-story row house fire – Maryland. By Funke JR, Attwood WR, Haas EJ, Miles ST, Bowyer M, and Loflin ME. Morgantown, WV: U.S. Department of Health and Human Services, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health, F2022-01. NIOSH [2025b]. A military firefighter killed and two firefighters injured by a wall collapse at a barn fire – West Virginia. By Loflin ME, Attwood WR, and Ringer SJ. Morgantown, WV: U.S. Department of Health and Human Services, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health, F2021-09. NIOSH [2025c]. Career candidate firefighter found unresponsive at a residential structure fire and dies 5 days later–Illinois. By Loflin ME and Saunders R. Morgantown, WV: U.S. Department of Health and Human Services, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health, F2021-20. NIOSH [2025d]. Firefighter dies and lieutenant seriously injured at a multi-family residential structure fire – Connecticut. By Loflin ME, Attwood WR, and Funke JR. Morgantown, WV: U.S. Department of Health and Human Services, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health, F2021-11. NIOSH [2025e]. Lieutenant dies from a floor collapse in residential structure fire with unpermitted renovations – Illinois. By Loflin ME, Attwood WR, and Austin E. Morgantown, WV: U.S. Department of Health and Human Services, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health, F2022-09. SKCFTC [2023]. Command procedures: Structure fires. Kent, WA: South King County Fire Training Consortium. March 2023.
Sullivan J [2012]. ISO’s role when transitioning from an offensive to a defensive attack. FireRescue, April: 86–89.
Page 24 Career Firefighter Dies after being Trapped by Collapse of Two Vacant Commercial Buildings – New York Report # F2025-03 Toledo Fire & Rescue Department [2012]. Rapid intervention team (RIT) standard operating procedure C82. Toledo, OH: Toledo Fire & Rescue Department. USFA [2023]. Reducing arson at vacant and abandoned buildings. Emmittsburg, MD: U.S. Fire Administration.
Weather Underground [2025]. Weather history. The Weather Underground. Date accessed: June 6, 2025. Investigator Information This investigation report was authored by Dr. Wesley R. Attwood, Senior Investigator, with the Fire Fighter Fatality Investigation and Prevention Program, Surveillance and Field Investigations Branch, Division of Safety Research, NIOSH. James Johnson, Fire Ground Survival Master Instructor and Codes and Standards Representative, and Jeffrey Seaton, an expert in firefighter survival, International Association of Fire Fighters, provided a subject matter expert review of the investigation report. Additional Information Preventing Deaths & Injuries to Firefighters by Establishing Collapse Zones at Structure Fires Firefighters are at significant risk for injury or death due to structural collapse during firefighting operations. Structural collapse often occurs without warning. NIOSH recommends that the IC establish defensive operations and collapse zones when there is potential for a structural collapse during fire- fighting operations. Access more information at: https://www.cdc.gov/niosh/docs/wp-solutions/2014- 120/.
Partnering to Reduce the Risk to Firefighters Responding to High-risk Buildings This NIOSH Science Blog discusses strategic partnerships fire departments and authorities having jurisdiction can develop to create solutions to large community safety issues such as abandoned or condemned structures.
NFPA 1700, Guide for Structural Fire Fighting (2021 edition) NFPA 1700, Guide for Structural Fire Fighting, 2021 edition, is the first NFPA document connecting fire dynamics research and its application to strategy, tactics, and best practices for firefighters in controlling fires within a structure. Disclaimer The information in this report is based upon dispatch records, audio recordings, witness statements, and other information that was made available to the National Institute for Occupational Safety and Health (NIOSH). Information gathered from witnesses may be affected by recall bias. The facts, contributing factors, and recommendations contained in this report are based on the totality of the information gathered during the investigation process. This report was prepared after the event occurred, includes information from appropriate subject matter experts, and is not intended to place blame on those involved in the incident. Mention of any company or product does not constitute endorsement by NIOSH, Centers for Disease Control and Prevention (CDC). In addition, citations to websites external to NIOSH do not constitute NIOSH endorsement of the sponsoring organizations or their programs or
Page 25 Career Firefighter Dies after being Trapped by Collapse of Two Vacant Commercial Buildings – New York Report # F2025-03 products. Furthermore, NIOSH is not responsible for the content of these websites. All web addresses referenced in this document were accessible as of the publication date. NIOSH Approved is a certification mark of the U.S. Department of Health and Human Services (HHS) registered in the United States and several international jurisdictions.
FD06036 | 2026_美国国家消防协会_曼哈顿单楼梯公寓火灾调查报告(英文).md
分类:06_境外及港澳台调查报告 | 年份:2026 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:md
一、基本情况
2026年5月4日,纽约曼哈顿一栋仅设单一疏散楼梯的公寓楼发生致命火灾。初步报道指出潜在致因包括单一疏散楼梯、敞开的门户以及已知的合规缺陷。
二、起火原因
后续信息确认:火灾由被人随意丢弃在首层门厅纸箱上的香烟引燃,烟气与火焰沿楼梯间向上蔓延;至少2名遇难者被发现于靠近屋顶的楼梯间顶部。
三、责任与致灾因素(待全面调查)
- 早期信息有限,尚不清楚建筑内安装了哪些消防系统及其是否按预期动作;
- 需弄清烟气如何进入楼梯间、人员为何在楼梯间内被烟气困住;
- 不能仅以“单一楼梯”草率归因——多层建筑(含多楼梯)在烟气/火焰进入楼梯间时同样发生过重大伤亡(如2022年布朗克斯17人遇难火灾)。
四、整改与教训
NFPA强调:致命火灾后立即下结论存在风险,应待完整调查厘清所有致因;无论建筑形式,工作联动的联网烟感、可靠自闭式防火门、自动喷淋的防护价值已被充分研究证明。对单楼梯高层提案的放宽,应在开放、共识性的规范制定流程中评估,而非以单一既有建筑火灾误导立法。
FD06037 | 2004_英国_fire-in-the-engine-room-on-the-suction-dredger-arco-avon-with-loss-of-1-life__ArcoAvon_Com.pdf
分类:06_境外及港澳台调查报告 | 年份:2004 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
Annex A HSE Research Report 222
HSE Health & Safety Executive Tests for the ignition and flame spread of clothing fabrics subjected to angle grinder sparks Results from ten generic fabrics and variants Prepared by Building Research Establishment Ltd for the Health and Safety Executive 2004 RESEARCH REPORT 222
HSE Health & Safety Executive Tests for the ignition and flame spread of clothing fabrics subjected to angle grinder sparks Results from ten generic fabrics and variants Peter Fardell, C.Chem. MRSC. MSc. and Carol Rock, BSc. Centre for Fire Performance and Suppression Fire Division Building Research Establishment Ltd Garston Watford Herts WD25 9XX Test methods for measuring the times to ignition and rates of flame spread of fabrics subjected to sparks from a hand angle grinder have been developed. Such tests are needed by the HSE as there is a regular incidence of burn injuries caused through workwear fabrics igniting and causing burns to the wearer through the use of angle grinders. Separate apparatus was used for measuring time-to-ignition and flame spread and development details have been previously reported. Ten generic fabric fabrics have been tested (sixteen, including variants) with the prototype apparatus, including synthetic, natural, synthetic/natural mixtures, Flame Retarded (FR), laundered FR and fabrics contaminated with grease and paint. Many fabrics could ignite after less than a minute with one “FR” fabric igniting after ten seconds. Another FR fabric, checked for correct FR content was resistant to ignition and flame spread.. Examples of non-ignition were observed with both natural and synthetic fabrics but a different mechanism was apparent in each case. Natural fabrics tended to form a protective carbonaceous char whereas synthetic fabrics tended to melt and form a hole around the stream of sparks, preventing or reducing the likelihood of ignition. Flame-spread rates were measured horizontally and at 25O to the horizontal. Most fabrics showed a well defined rate of flame spread which was usually significantly faster in the inclined position. Overall rates between 9mm/min and 891 mm/min were measured although in some cases flaming ceased before the whole length of sample had been consumed. Two full scale tests using a manikin clothed in FR (Proban) cotton and a non FR cotton “boiler suits” confirmed the small scale test results and illustrated the value of FR fabrics in resisting ignition and flame spread from hand grinder sparks. The non FR boiler suit ignited after twenty seconds and burnt to completion. The FR boiler suit did not ignite after sustained continuous application of a stream of sparks over a five minute period. This report and the work it describes were funded by the Health and Safety Executive (HSE). Its contents, including any opinions and/or conclusions expressed, are those of the authors alone and do not necessarily reflect HSE policy. HSE BOOKS
© Crown copyright 2004 First published 2004 ISBN 0 7176 2841 8 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the prior written permission of the copyright owner. Applications for reproduction should be made in writing to: Licensing Division, Her Majesty's Stationery Office, St Clements House, 2-16 Colegate, Norwich NR3 1BQ or by e-mail to hmsolicensing@cabinet-office.x.gsi.gov.uk ii
ACKNOWLEDGEMENTS The authors would like to thank Miss Leah Amendt, Miss Sheila Warbus and John Cormican for providing enthusiastic and skilful practical help with all stages of this project. iii
iv
CONTENTS EXECUTIVE SUMMARY 1 1 INTRODUCTION 3 2 DESCRIPTION OF THE PROJECT 5 2.1 General Background 5 2.2 Fabrics Used 5 2.3 Replacement for fabric 2. 7 2.4 Contaminated samples 7 2.5 Effect of changing the sample holder for the ignition studies. 8 2.6 Effect of FR additive to the cotton fabric. 9 2.7 Testing of the ten generic fabrics and variants 9 2.8 Full scale dressed manikin tests 9 3 FINDINGS AND DISCUSSION 11 3.1 Summary of ignition and flame spread results 11 3.2 Natural and synthetic fabrics 13 3.3 FR treated fabrics and effects of laundering 13 3.4 Fabrics contaminated with grease or paint. 13 3.5 Manikin fire test 14 3.6 Detailed test results 15 APPENDIX 1 - Test data obtained from the “time-to-ignition” study of the ten generic fabrics and variants. APPENDIX 2 – Test data obtained from the “flame-spread rates” study of the ten generic fabrics and variants. APPENDIX 3 – Ancillary measurements 4 CONCLUSIONS AND RECOMMENDATIONS 17 REFERENCES 35 v
vi
EXECUTIVE SUMMARY Apparatus and procedures have been developed to measure the times to ignition and flame-spread rates of clothing fabrics subjected to angle grinder sparks. The development work has been separately reported in previous Milestone deliverables. This final report describes results obtained using the prototype apparatus and procedures on ten generic fabric samples and variants, chosen by the HSE. The time-to-ignition apparatus utilised a proprietary, commonly available, 115mm disc angle grinder, retained in a proprietary stand. The work piece used was a hollow square section bar of mild steel, 50mm x 50mm x 7mm wall thickness, which enabled the apparatus to generate a steady and repeatable stream of sparks over periods in excess of 5 minutes. For measurement of the time-to-ignition, the tested fabric was held in a vertical wire mesh holder which allowed the stream of grinder sparks to impinge at the base of the sample in a “U” shaped vertical channel. The sparks were allowed to impinge for various fixed time intervals after which the sample was inspected for self-propagating flames. Each time interval was repeated between 3 and 5 times. When every trial over a particular time period produced self-propagating flaming, this was recorded as the time-to-ignition. For measurement of the flame spread rate procedure, it was not possible to utilise the same apparatus used for time-to-ignition. This was due to uncertainties in measuring the flame front and because the flame spread following ignition could be very variable depending on subtle folds developing and sections of the sample falling at random during flaming. It was therefore agreed to utilise a separate apparatus for the flame spread rate studies. This apparatus was based on an existing standard used to test the horizontal flame spread of fabrics used in the interior of vehicles in the USA. Each flame spread rate determination was repeated and the mean value used as the quoted flame spread rate. Finally, two tests were carried out using a full size manikin dressed in an FR and then a non FR boiler suit,using the standard stream of angle grinder sparks used in the main study. In summary the main findings were: · Natural and synthetic fabrics were not particularly distinguishable by their ignition and flame spread performance – although the mechanisms were different in each case. Synthetic fabrics tended to melt, natural fabrics tended to char. · A proprietary FR fabric ignited readily. · A laundered FR cotton fabric had a reduced time to (partial) ignition compared with an unlaundered sample but remained resistant to flame spread. · Grease contamination showed marginally reduced ignition times and a tendency to increased flame-spread rates over the uncontaminated samples. · Paint contamination increased the ignition time and reduced the rate of flame spread with a cotton sample. With a contaminated polyester sample, time-to-ignition was reduced and flame- spread rates were marginally increased over the uncontaminated sample. 1
· The FR boiler suit resisted ignition and failed to ignite after 5 minutes of continuous application of a stream of sparks. The non-FR boiler suit ignited after approximately 20 seconds and continued to burn to completion. A number of ancillary studies were also carried out to investigate particular observations. These were: · Validation trials for a substitute fabric which had been discontinued during the study. (The substitute fabric was deemed equivalent). · Investigation of the time-to-ignition changes occurring following a change of sample holder and operator. (The changes were ascribed to the change of sample holder and were not found to be significantly operator dependant). · Obtaining elemental analysis of a substitute FR fabric following the ready ignition observed with an original FR fabric. (This “pedigree” fabric was shown by elemental analysis to contain the expected level of FR treatment and exhibited the expected ignition characteristics). It is recommended that the apparatus and methodology developed in this study be adopted for use by the HSE as a basis for testing the ignition and rate of flame spread performance of work wear fabrics when subjected to sparks from an angle grinder. It is further recommended that some aspects of the study (e.g. fabric combinations, contaminated samples and development of performance criteria) should be carried out in future work. 2
1 INTRODUCTION This study was undertaken for the HSE because of concerns over the incidence of injuries sustained in the workplace from fires caused by angle grinder sparks impinging on clothing. A simple but realistic test was required which could measure times to ignition and flame-spread rates from a range of fabrics which might be used in work wear. Statistics gathered by the UK’s Health and Safety Executive (HSE) as part of their “FIREX” database [1] have shown a continuing incidence of burn injuries caused by hand operated angle grinder sparks impinging on clothing. There have been at least ten such incidents over the last ten years including three serious injuries. The Fire and Risk Sciences (FRS) division of the Building Research Establishment was invited to design, develop and establish standard test apparatus and procedures for measuring the time-to- ignition and rates of flame spread on clothing fabrics subjected to constant stream of angle grinder sparks. The intention is to use the methods to determine the ignition and flame spread characteristics of fabrics which may be encountered in the workplace, both as normal and workwear clothing. There was no requirement to set criteria for hazard classification although this would form a logical next step. This is the final milestone report and describes a study of the ignition and flame spread characteristics of ten generic work wear fabrics and variants, (chosen by the HSE following the development stages) subjected to angle grinder sparks. The methods used for measuring times to ignition and flame spread have been developed in previous work under this contract and have been separately reported [2,3]. Progress reports, visits by and to the HSE project officer and other communications have been made at regular intervals throughout the study. 3
4
2 DESCRIPTION OF THE PROJECT 2.1 General Background Previous work on this project has been fully described in reports of meetings with the HSE project officer and two Milestone Reports [2,3] but in summary, the initial work involved setting up a proprietary hand angle grinder and stand and developing a technique for generating a standard continuous shower of sparks from a suitable work piece. This was followed by the development of a suitable fabric sample holder and technique for measuring time-to-ignition of tested fabrics. For flame spread measurements, an existing small-scale horizontal flame spread apparatus [4] was modified and used. It had been hoped that the ignition and flame spread parameters would be measured on the same apparatus and during the same test. However it proved very difficult and subjective to measure flame- spread rates following ignition of a vertical sample with grinder sparks. The flame front was difficult to follow and although possibly the worst case for flame spread, (vertical orientation) the variations in flaming behaviour (e.g. through folds developing in a random manner and fabric dropping from the sample holder) it was decided to separate the testing for ignition and flame spread behaviour. This gave the opportunity to test flame spread in a much more controlled manner (using a modified existing standard test protocol [4]) and to investigate the effect of sample orientation on flame-spread rates. A wide range of fabric types including pure natural, pure synthetic and natural/synthetic mixtures were studied in the development stages of the project. 2.2 Fabrics Used Table 1 summarises the fabrics and their variants used over the entire study both during the development work (as previously reported [2,3]) and as reported here. The fabrics tested for this report, using the prototype apparatus and procedures, are shown in bold type in table 1. This includes the ten generic fabrics, fabric combinations, fabrics contaminated with grease or paint, and laundered and unlaundered FR cotton fabrics. All fabrics were conditioned for a minimum of 48 hours to Standard conditions (50%RH +/- 5% and 23OC +/- 2OC) prior to testing. . 5
Table 1 – Summary of fabric fabrics used over the entire study (for this report in bold). Fabric Number Description Mass per unit area (kg/m2) Remarks 1 35% polyester/65% cotton 0.092 2 100% cotton close weave 0.156 Replaced by 15. 3 100% cotton FR treated (interliner) 0.140 4 100% polyester (“Charmeuse” satin) 0.091 5 100% cotton (open weave) 0.174 6 81% acrylic/19% polyester 0.212 7 59% cotton/41% modacrylic 0.402 8 55% polyester/45% viscose FR treated 0.281 9 100% wool (suiting “dogtooth”) 0.182 10 100% cotton FR treated (corduroy) 0.599 11 Stretch denim (cotton) 0.377 12 Polyester fabric and wadding (Quilting) 0.219 13 100% polyester (purple) 0.104 14 100% polyester over 100% wool N/A Two layers of fabric 15 Cotton close weave (replacement for 2, blue/white) 0.161 Checked for similarity with 2 16 “Proban” treated cotton - unlaundered N/A CHNP (41.1%, 6.3%, 2.1%, 2.3%) 17 “Proban” treated cotton - laundered N/A To BS EN ISO 10528:1995 18
100% cotton with grease contaminant
Fabric 15 + grease 19
100% cotton with paint contaminant
Fabric 15 + paint 20
100% polyester with grease contaminant
Fabric 13 + grease 21
100% polyester with paint contaminant
Fabric 13 + paint 22
Boiler suit (cotton, non FR)
23
Boiler suit (cotton FR)
6
- 3
Replacement for fabric 2. Following the use of this fabric (a “close weave” cotton) for ignition and flame spread study, more fabric was needed for the “contamination” studies (see 2.4). Unfortunately it was discovered from the supplier that this was a discontinued line. Although there was an option for this fabric to be specially made by the manufacturer it was decided that due to the expense and time period required, a similar fabric would be selected which was likely to be in stock for an extended period. Fabric 15 was therefore obtained and used for the rest of the “contamination” study in place of fabric 2, following checks on the similarity of the new fabric to the old in terms of time-to-ignition and flame spread (horizontal sample only). 2.4 Contaminated samples Two fabric types – one 100% synthetic (fabric 13) and one 100% natural (fabric 15 – the replacement for fabric 2) were chosen for study where the fabric had been contaminated with a petroleum-based workshop grease and an organic solvent paint. The contaminated fabrics were designated 18,19,20 and 21 (see table 1). The whole area of fabric was coated in each case for the ignition and flame spread tests, with an allowance made for the different sized specimens required for each test. With the grease contaminant, application was attempted by smearing a weighed portion of grease on a spatula over the whole area of a fabric both for the time-to-ignition and flame spread samples. It was possible to obtain a reasonably uniform coating with this technique after several trials. The samples were tested within 2 hours of application to avoid any significant evaporation of any volatiles. With the paint contaminant, application was attempted by simply brushing on the paint to the fabric surface as uniformly as possible, and allowing the paint to dry over a 24 hour period. The “loading” of paint was measured by weighing the fabric before and after application of the paint but it proved difficult to make the loadings identical for the two fabric types, and a fairly wide variation of loading had to be accepted. Table 2 summarises the fabrics chosen, the contaminants used and the contaminant loading achieved. 7
Table 2: A summary of the contaminated tests fabrics tested Fabric Description Contaminant Approximate mass applied. Ignition Flame Spread 18 100% Cotton close weave “Castrol Spherol L-EP2” petroleum based grease. 2g over an area 300mm x 100 mm 1g over an area 300mm x 35mm 20 100% polyester “Castrol Spherol L-EP2” petroleum based grease. 2g over an area 300mm x 100 mm 1g over an area 300mm x 35mm 19 100% Cotton close weave “Dulux Trade High Gloss” organic solvent based paint. 3.1g over an area of 300mm x 100mm 1.4g over an area of 300mm x 35mm 21 100% polyester “Dulux Trade High Gloss” organic solvent based paint. 1.6g over an area of 300mm x 100mm 0.68g over an area of 300mm x 35 mm 2.5 Effect of changing the sample holder for the ignition studies. During the development stages of this work, a simple variable “handy angle” sample holder was used for the measurement of times to ignition of fabric fabrics subjected to angle grinder sparks. [2]. This enabled various configurations of fabric to be presented to the stream of grinder sparks, to achieve a configuration which gave the most consistent and measurable ignition results. However following the establishment of the optimum dimensions for the sample holder it was decided to use a more accurately constructed, fixed dimensions, open wire mesh sample holder for the final series of tests on the ten generic fabrics and variants. However early trials with this holder, with a different operator, showed significantly shorter times to ignition for the same fabric. A short series of tests was therefore performed on two of the fabrics (9 and 12) which showed the most variability in order to establish whether the effect was due to the change of sample holder or to the change of operator. 8
- 6
Effect of FR additive to the cotton fabric. One of the ten generic fabrics chosen for study in this phase of the work was an FR cotton, (fabric 3). It was intended to use this fabric to determine the effects of a standard laundry cycle [5] on the flammability of an FR fabric but this particular fabric surprisingly proved to ignite readily from the grinder sparks (but showed little flame spread). It was therefore decided to include a “pedigree” FR cotton fabric treated with “Proban” (fabric16) in the programme with elemental analysis to determine the level of FR present, and check this level with the usually accepted level for an FR cotton fabric [6]. Accordingly a sample of a “Proban” treated cotton was purchased and an elemental analysis (C, H, N, and P) obtained. 2.7 Testing of the ten generic fabrics and variants The testing apparatus and procedures used for the work carried out for this report was as previously described in detail [2,3]. In summary, for measurement of the time-to-ignition, the tested fabric was held in a vertical wire mesh holder which allowed the stream of grinder sparks to impinge at the base of the sample in a “U” shaped vertical channel. The sparks were allowed to impinge for various fixed time intervals after which the sample was inspected for self-propagating flames. Each time interval was repeated between 3 and 5 times. When every trial over a particular time period produced self- propagating flaming, this was recorded as the time-to-ignition. Appendix 1 contains the detailed results of the time-to-ignition study. For measurement of the flame spread rate, it was not possible to utilise the same apparatus used for time-to-ignition. This was due to uncertainties in measuring the flame front and because the flame spread following ignition could be very variable depending on subtle folds developing and sections of the sample falling at random during flaming. It was therefore agreed to utilise a separate apparatus for the flame spread rate studies. This apparatus was based on an existing standard used to test the horizontal flame spread of fabrics used in the interior of vehicles in the USA. Each flame spread rate determination was repeated and the mean value used as the quoted flame spread rate. Appendix 2 contains the detailed results of the flame spread rate study. 2.8 Full scale dressed manikin tests Two cotton “boiler suits” were obtained from a recognised supplier [7], one treated with “Proban” flame retardant, the other untreated. These boiler suits were used to clothe a manikin with mineral wool inserts to simulate the torso and arms and legs. Each dressed manikin was subjected to a stream of grinder sparks below the waistline and observations made of ignition and flame spread. 9
10
3 FINDINGS AND DISCUSSION 3.1 Summary of ignition and flame spread results Table 3 summarises the ignition and flame spread data for the ten chosen fabrics and variants. For time-to-ignition, the results were obtained using the wire frame sample holder thus repeating several of the tests carried out in the development stages which used a “handy angle” sample holder. Three to five successful ignitions (i.e. flame propagating away from the influence of the grinder sparks) were used as the criteria for ignition over a given time interval. In some cases differences in times to ignition were observed, depending on the orientation (i.e. weft lengthwise or width wise). These are indicted in table 3 where the time-to-ignition was altered sufficiently to place the result in another time period. For the flame spread rate trials, only the additional fabrics required for test following the development stages were tested. Flame-spread rates for the other fabrics are reported here as obtained during the development stages. 11
Table 3 – Summary of time-to-ignition and flame spread results for the ten generic fabrics and variants. Fabric number Fabric description Time-to-ignition (Seconds). 1 Mean rate of flame spread (horizontal) (mm/min) Mean rate of flame spread (25Oincline) (mm/min) 1 35% polyester, 65% cotton 10 176 889 2 100% cotton (close weave) 20 131 891 3 100% cotton “FR” (interliner) 10 0 450 4 100% polyester Not measurable (melted and formed hole). 0 85 (extinguished after 15 seconds) 9 100% wool (suiting) 45 0 0 10 100% cotton “FR” (corduroy) Did not ignite. 0 143 (extinguished after 46 seconds) 11 Denim (cotton) stretch fabric 20 (lengthwise) 30 (widthwise) 84 407 12 Polyester fabric quilt over wadding 10 80 391 13 100% polyester Not measurable (melted and formed hole). 0 248 (extinguished after 20 seconds) 14 100% polyester over 100% wool (two layers) 30 0 0 16 100% cotton with “Proban” FR treatment – unlaundered sample. 30 (only small flamelets observed for 2 seconds). 0 0 17 100% cotton with “Proban” FR treatment – laundered sample. 10 (only small flamelets observed for 2 seconds). 0 0 18 100% cotton (fabric 15) with grease contaminant. 15 140 728 19 100% cotton (fabric 15) with paint contaminant. Ignited in only one trial at 60s on non painted area. 91 496 20 100% polyester (fabric 13) with grease contaminant. Ignited in only one trial at 40s. 254 (extinguished after 10 secs) 9.4 (extinguished after 12 seconds) 21 100% polyester (fabric 13) with paint contaminant. 30 170 587 12
- 2
Natural and synthetic fabrics Time-to-ignition results did not particularly distinguish between natural and synthetic fabrics. Flame- spread rates were generally significantly faster for the 25O inclined sample, over the horizontal sample. In some cases no flame spread was observed with a horizontal orientation but was observed in the 25O inclined orientation. With the synthetic fabrics a hole was often punched through the fabric preventing further impingement of sparks onto the sample, which in some cases produced a “no-ignition” result. Flame- spread rates on these samples were however often measurable, particularly in the 25O inclined orientation. With natural fabrics a char tended to form which appeared to inhibit ignition. Wool was particularly resistant. A polyester covering over wool (fabric 14) ignited after 30 seconds but a flame spread rate could not be determined in either of the two orientations attempted for this double-layered fabric. Fabrics consisting of synthetic/natural fibre mixes were not particularly distinguishable from their “pure” counterparts. With fabric combinations (i.e. two layers) there was some evidence of intermediate behaviour from that measured with the individual components, but this was somewhat tenuous and needs further investigation. 3.3 FR treated fabrics and effects of laundering One proprietary FR fabric (fabric 3) ignited readily (after 10 seconds). This required the inclusion of a “pedigree” fabric, analysed for FR content (fabric 16). The phosphorus content measured (2.3%) is consistent with the recognised correct loading of “Proban” cotton fabric in this application [6]. The unlaundered “Proban” treated cotton fabric (fabric 16) ignited after 30 seconds but produced small flamelets which extinguished after a few seconds. After being subjected to a standard laundry cycle, the FR “pedigree” fabric (fabric 17) ignited after 10 seconds (but with small, barely propagating flames). No flame spread was observed with either the laundered or unlaundered samples. 3.4 Fabrics contaminated with grease or paint. Grease contamination on a cotton fabric (fabric 18) reduced the time-to-ignition from 20 seconds on the uncontaminated sample to 15 seconds. Flame spread rate was slightly increased in a horizontal orientation and slightly decreased in the 25 degree inclined orientation compared to the uncontaminated sample. (However, note that a substitute fabric for fabric 2 had to be used for this “contamination” trial). Paint contamination on a cotton fabric (fabric 19) increased the time-to-ignition from 20 seconds on the uncontaminated sample to over 60 seconds. Flame-spread rates were significantly reduced in both orientations, over the uncontaminated sample. (However, note that a substitute fabric for fabric 2 – fabric 15 - had to be used for these “contamination” trials). 13
Grease contamination on a polyester fabric (fabric 20) did produce a marginal ignition at 40 seconds. The uncontaminated sample (fabric 13), melted and developed a hole, preventing further impact from sparks. A flame-spread rate for the contaminated sample was observed in the horizontal orientation with (atypically) a much lower rate in the 25O orientation, but in both tests the flame extinguished well before complete combustion. No spread was observed with the uncontaminated sample when horizontal but the 25O orientation uncontaminated sample did produce a measurable flame spread but again flaming extinguished well before the sample had been consumed. Paint contamination on a polyester fabric (fabric 21), produced a reliable ignition after 30 seconds. The uncontaminated sample (fabric 13) melted and developed a hole, preventing further impact from sparks. Flame-spread rates of the contaminated sample were measured with both sample orientations with complete combustion of the sample in each case. The flame spread rate was much faster with the 25O orientation. These variable results must be considered to be due in part to the difficulties experienced in applying a uniform and consistent level of contamination on the fabrics and to the variable flammability nature of the base materials, particularly the polyester fabric. Further work is needed on this aspect to confirm (or refute) the findings from this limited study. 3.5 Manikin fire test The FR treated boiler suit resisted ignition and did not produce any signs of self-propagating flames after exposing the fabric to a sustained stream of sparks over a five minute period. The fabric glowed, smouldered and fumed during application of the sparks but this ceased shortly after the stream of sparks was stopped. The non FR boiler suit ignited readily after approximately 20 seconds when the stream of sparks was stopped. It continued to burn to completion. Figures 1 and 2 illustrate the behaviour of the FR and non FR boiler suit in the manikin tests: Figure 1. Grinder sparks being applied to manikin (FR “Proban” cotton boiler suit). No ignition occurred after five minutes of sustained application of the sparks 14
Figure 2. Grinder sparks have been applied to a manikin (non-FR boiler suit). The result after approximately 45 seconds (ignition occurred at approximately 20 seconds). 3.6 Detailed test results Appendices 1 and 2 provide details and results of the all trials carried out to obtain these data for ignition times and flame-spread rates respectively. Appendix 3 provides details and results of the ancillary measures carried out during this project i.e. · Trials for a substitute for fabric 2. · Establishing the degree of operator dependence for the ignition study · Elemental analysis of a “Proban” flame retarded cotton fabric. 15
16
4 CONCLUSIONS AND RECOMMENDATIONS 1. Following extensive development in earlier reported studies, [2,3] an apparatus for measuring the time-to-ignition and an apparatus for measuring rate of flame spread has been developed for work wear fabrics exposed to angle grinder sparks. 2. Ten generic fabrics and variants were chosen by the HSE to use in these tests with the two sets of apparatus. The ten fabrics and variants included pure synthetic fabrics, pure natural fabrics, synthetic/natural fibre mixtures, fabric combinations, FR fabrics (in one case laundered and unlaundered) and a natural and synthetic fabric both contaminated with paint and grease. In summary, main conclusions were: · The range of synthetic and natural fabrics tested showed ignition times and flame- spread rates covering a wide range but there was no particular distinction between values obtained for the two types. · Synthetic fabrics tended to melt and natural fabrics tended to form a surface char, both effects having a strong influence on performance in the ignition and flame spread tests. · Natural/synthetic fibre mixes were not particularly distinguishable from their “pure” counterparts. · Combinations (i.e. two layers) of synthetic and natural fabrics showed some evidence of intermediate performance between the two components. · A cotton fabric marked as “FR interliner” ignited readily. · A cotton fabric purchased as “FR” and checked for acceptable FR content by elemental analysis did exhibit very limited ignition and flame spread behaviour, both before and after being subjected to a single standard laundry cycle.[5]. · Synthetic and natural fabrics contaminated (separately) with grease and paint did not show a particularly degraded performance – in some cases a marginal improvement was observed. However these results must be considered as provisional (and subject to further confirmation) due to problems with ensuring a uniform application of contaminant to the samples and the variability in behaviour of the base fabrics. · Tests on a full sized manikin clothed in separate tests with an FR and non FR “boiler suit” demonstrated the value of FR treated materials when subjected to sparks from an angle grinder. The FR boiler suit did not ignite after 5 minutes of sustained spark impingement whereas the non FR boiler suit ignited after approximately 20 seconds and burnt to completion. 3. It is recommended that the test apparatus and methodologies as developed in this study should be used as the basis for a Standard test method for determining the times to ignition and rates of flame spread of fabrics likely to be encountered in the workplace, when subjected to a stream of sparks from an angle grinder. 4. Further development work is recommended, particularly in the areas of fabric combinations, contaminated fabrics and to develop performance criteria. 17
18
APPENDIX 1 - Test data obtained from the “time-to-ignition” study of the ten generic fabrics and variants. (Note – “Width” and “Length” terms relate to the direction of the warp threads of the fabric in the sample holder. Fabric: 1. 35%polyester/65%cotton. Orientation: Width (Length) Time sparks applied (seconds) Trial 1 Trial 2 Trial 3 Trial 4 Trial 5 Remarks 5 N (Y) N (Y) Y (Y) Y (Y) Y (Y) 10 Y Y Y Y Y
15
-
-
20
-
-
30
-
-
40
-
-
Other
-
-
Fabric: 2. Cotton close weave. (note – replaced by fabric 15 for “contamination” studies). Orientation: Width (Length) Time sparks applied (seconds) Trial 1 Trial 2 Trial 3 Trial 4 Trial 5 Remarks
5
-
-
10 N N
N
- 15 N (N) N (N)
N (N)
- 20 Y (Y) Y (Y)
Y (Y)
-
30
-
-
40
-
-
Other
-
-
19
Fabric: 3. 100% cotton FR treated (interliner). Orientation: Width (Length) Time sparks applied (seconds) Trial 1 Trial 2 Trial 3 Trial 4 Trial 5 Remarks 5 N (N) N (N) N (N) N (N) N (N) Slight scorching 10 Y (Y) Y (Y) Y (Y) Y (Y) Y (Y) Surprising for an FR product
15
-
-
20 (Y) (Y) (Y) (Y) (Y) Surprising for an FR product
30
-
-
40
-
-
Other
-
-
Fabric: 4. 100% polyester. Orientation: Width Time sparks applied (seconds) Trial 1 Trial 2 Trial 3 Trial 4 Trial 5 Remarks 5 N N
N
- No sign of ignition/fumes 10 N N
N
Slight melting 15 N N N N N Slight melting 20 N N N -
Melted, punched hole. 30 - - - - - 40 N N N -
Melted, punched hole Other 120 N N N - - Melted, punched hole 20 Fabric: 9. 100% wool (suiting). Orientation: Width (Length) Time sparks applied (seconds) Trial 1 Trial 2 Trial 3 Trial 4 Trial 5 Remarks 5 N
N
-
No sign of scorching 10 N
N
-
No sign of scorching 15 N N
N
- Slight scorching 20 N (N) N (N)
N (N)
- More scorching, light fuming 30 N (N) N (N)
N (N)
- Scorching and moderate fuming 40 Y (N) N (Y) N (Y) Y (N)
- (Y)
Transient flames for approx. three seconds. 45 Y (Y) Y (Y)
Y (Y)
- Fabric: 10. 100% cotton FR treated (corduroy). Orientation: Length Time sparks applied (seconds) Trial 1 Trial 2 Trial 3 Trial 4 Trial 5 Remarks 5 N
N
-
No signs of fumes/scorching 10 N
N
-
No signs of fumes/scorching 15 N
N
-
No signs of fumes/scorching 20 N N
N
Some scorching, hole developed 30 - - - - - 40 N N N - - Some scorching, punched hole Other 120 N N N N N Some scorching, punched hole. Expected from FR? 21 Fabric: 11. Stretch denim (cotton). Orientation : Width (Length) Time sparks applied (seconds) Trial 1 Trial 2 Trial 3 Trial 4 Trial 5 Remarks 5 N
N
-
No sign of fumes or scorching 10 N(N) N(N)
N(N)
- Slight scorching 15 Y(N) Y(Y) Y(Y) N(Y) N Heavy scorching before flame 20 N(Y) Y(Y) Y(Y) N(Y) Y(Y) Heavy scorching before flame 30 Y Y Y Y Y Fabric: 12. Polyester fabric and wadding. Width (Length) Time sparks applied (seconds) Trial 1 Trial 2 Trial 3 Trial 4 Trial 5 Remarks 5 N (N) N (N)
N (N)
- Some scorching 10 Y (Y) Y (N)
Y (N)
-
15
-
-
20
-
-
30
-
-
40
-
-
Other
-
-
22
Fabric: 13. 100% polyester. Orientation: Width (Length) Time sparks applied (seconds) Trial 1 Trial 2 Trial 3 Trial 4 Trial 5 Remarks 5 N
N
-
Small holes from sparks 10 N
N
-
Small holes from sparks 15 N
N
-
Scorching and small hole 20 N (N) N (N)
N (N)
- Scorching and larger hole 30 N
N
-
Scorching and larger hole 40 N (N) N (N)
N (N)
- Scorching and larger hole Other (120) N N
N
Scorching large hole punched. Sparks not contacting fabric. Fabric: 14. 100% polyester over 100% wool (two fabrics). Orientation: Width (Length) Time sparks applied (seconds) Trial 1 Trial 2 Trial 3 Trial 4 Trial 5 Remarks 5 - - - - - 10 - - - - - 15 - - - - - 20 N (N) N (N) N (N) - - Scorching, melted hole. 30 Y (N) Y (Y) Y (Y) (N) (Y) 40 - - - - - Other - - - - - 23 Fabric: 16. “Proban” treated cotton. Unlaundered Time sparks applied (seconds) Trial 1 Trial 2 Trial 3 Trial 4 Trial 5 Remarks
5
-
-
10 N N
N
Slight scorching 15 N N N - - 20 N Y Y Y - Fuming and charring, flaming for 2 seconds only. 30 Y Y Y Y Y Fuming, charring, flaming for 2 seconds only. 40 Y Y Y Y Y Fuming, scorching, flaming for 2 seconds only. Other - - - - - Fabric: 17. “Proban” treated cotton. Laundered Time sparks applied (seconds) Trial 1 Trial 2 Trial 3 Trial 4 Trial 5 Remarks 5 N N N - - 10 Y Y Y - - Flaming stopped after 2 seconds 15 Y Y Y - - Flaming stopped after 2 seconds 20 - - - - - 30 - - - - - 40 - - - - - Other - - - - - 24 Fabric: 18. 100% cotton (fabric 15) with grease contaminant. Time sparks applied (seconds) Trial 1 Trial 2 Trial 3 Trial 4 Trial 5 Remarks
5
-
-
10 N N
N
- 15 Y Y
Y
-
20
-
-
30
-
-
40
-
-
Other
-
-
Fabric: 19. 100% cotton (fabric 15) with paint contaminant. Time sparks applied (seconds) Trial 1 Trial 2 Trial 3 Trial 4 Trial 5 Remarks
5
-
-
10
-
-
15
-
-
20 N N
N
-
30
-
-
40 N N
N
- Other 60 N N
Y
- Flaming only on non painted area. 25
Fabric: 20. 100% polyester (fabric 13) with grease contaminant. Time sparks applied (seconds) Trial 1 Trial 2 Trial 3 Trial 4 Trial 5 Remarks
5
-
-
10
-
-
15
-
-
20 N N
N
- Scorching and hole punched through
30
-
-
40 N N
Y
- Scorching, hole punched flaming in one test. Other (60) N
N
-
Fabric: 21. 100% polyester with paint contaminant. Time sparks applied (seconds) Trial 1 Trial 2 Trial 3 Trial 4 Trial 5 Remarks
5
-
-
10
-
-
15 N N
N
- Slight hole and light fumes 20 N Y Y Y Y Hole but continued flaming 30 Y Y Y Y Y Holed but continued flaming.
40
-
-
Other
-
-
26
APPENDIX 2 – Test data obtained from the “flame-spread rates” study of the ten generic fabrics and variants. Fabric Time in seconds to reach indicated flame spread distance in mm and (inches) – Reference Horizontal Sample. Number (Table 1) and repeat number 0 (0) 25.4 (1) 50.8 (2) 76.2 (3) 101.6 (4) 127.0 (5) 152.4 (6) 177.8 (7) 203.2 (8) 228.6 (9) 254.0 (10)# 1.1 16 28 31 40 52 59 67 77 84 95 108 1.2 13 20 29 36 44 52 60 69 77 85 95 2.1 20 32 43 54 68 79 91 101 110 121 134 2.2 17 30 38 51 64 75 84 98 108 120 136 3.1 0 No flame spread 3.2 0 4.1 0 4.2 0 9.1 0 No flame spread 9.2 0 10.1 0 10.2 0 11.1 44 67 88 108 128 145 163 183 199 217 235 11.2 43 64 83 101 119 136 152 168 186 202 218 12.1 23 45 67 92 111 135 150 170 183 201 222 12.2 25 44 64 85 105 122 142 160 175 192 210 13.1 2 No further flame spread 13.2 3 14.1 No flame spread 14.2 16.1 0 No flame spread from ignition source 16.2 0 27
- 1
0 No flame spread from ignition source 17.2 0 18.1 25 35 47 56 66 76 85 95 105 117 131 18.2 25 36 49 61 72 85 93 102 115 125 137 19.1 25 42 60 75 90 107 125 141 157 178 197 19.2 26 42 61 77 95 110 126 141 158 174 192 20.1 7 13 20.2 Very slight propagation from source (few mm) before extinguishing 21.1 6 16 27 43 52 60 67 75 86 94 98 21.2 6 12 20 27 34 48 58 70 82 89 94 28
Fabric Reference Number (Table 1) and repeat number Time in seconds to reach indicated flame spread distance in mm and (inches) – Angled Sample (25O) 0 (0)* 25.4 (1) 50.8 (2) 76.2 (3) 101.6 (4) 127.0 (5) 152.4 (6) 177.8 (7) 203.2 (8) 228.6 (9) 254.0 (10)# 1.1 4 7 9 11 13 24 1.2 4 19 2.1 3 17 2.2 5 27 3.1 4 6 36 3.2 4 9 40 4.1 6 No further flame spread 4.2 6 15 No further flame spread 9.1 0 No flame spread 9.2 0 10.1 12 28 37 46 No further flame spread 10.2 10 20 No further flame spread 11.1 12 18 23 27 31 34 36 40 43 47 50 11.2 13 19 24 28 32 35 39 41 45 48 50 12.1 10 13 18 20 23 26
30
-
48 12.2 10 15 20 22
25
-
-
50 13.1 12 20 No further flame spread 13.2 15 20 14.1 No flame spread 14.2 16.1 13 No further flame spread 16.2 12 17.1 13 No further flame spread 17.2 13 18.1
10
- 15
16
-
26
- 30 29
- 2
7 10 13
15
-
22
- 29 19.1
8
-
15
20
30
- 36 19.2 10 14 17 20 24
26
35
40
44 20.1 Very slight flame spread before extinguishing 20.2 6 10 No further flame spread 21.1 3
7
10
15
20
25 28 21.2
3
-
12
14
21
23
30 30
APPENDIX 3 – Ancillary measurements During the study a number of ancillary measurements were made to investigate various observations connected with the procedures. For completeness these are presented here. Trials for a substitute for fabric 2 The new fabric (15) was required as the original (fabric 2) was discontinued before the contamination trials (which required fabric 2), could take place. Table A3.1 shows the comparative data obtained for these two fabrics. Table A3.1 - Comparative data for an original and replacement cotton fabric Fabric Mass/unit area (kg/m2) Time-to-ignition (seconds) Mean horizontal flame spread (mm/min) Mean horizontal flame spread (repeat) (mm/min) 2 0.156 20 134 128 15 0.161 20 98.7 101 Although fabric 15 showed some difference in flame spread rate, the difference was considered small enough (in the context of the range of flame-spread rates observed throughout the whole study) to enable the fabric to be used as a substitute for the discontinued fabric 2 for the “contamination” trials in this study. Establishing operator dependence for the ignition study The development work for subjecting fabric samples to a consistent shower of sparks from an angle grinder, initially utilised a sample holder made from “handy angle”. This was to enable a variety of configurations of fabric to be readily trialled to ensure the final design gave the most repeatable and reliable results. On completion of the development work, a final design was constructed from an open mesh wire sheet to the final required dimensions. However, early trials with the new sample holder, and with a different test operator showed significant differences in times-to-ignition; i.e. giving shorter times with the new sample holder. In order to check whether this was due to the change of sample holder or operator, two fabrics were chosen and trialled by both operators with both types of sample holder. 31
Table A3.2 below summarises the results: Table A3.2: Results from test using different operators and the two different fabric sample holders Sample Operator Fabric Run 1 Run 2 Run 3 holder (time/ignition) (time/ignition) (time/ignition) Handy angle JC 9 60sec/no 60sec/no 60sec/no Open wire JC 9 30sec/no 40s/yes 40sec/no 45s/yes 40sec/no 45s/yes Handy angle JC 12 5sec/no 10sec/no 5sec/no 10sec/yes 20sec/yes 10sec/yes Open wire JC 12 5sec/no 5sec/no 5sec/no 10sec/yes 10sec/yes 10sec/yes Handy angle PJF 9 60sec/no 60sec/no 60sec/no Open wire PJF 9 30sec/no 40 sec/no 40sec/no 45sec/yes 45sec/yes 45sec/yes Handy angle PJF 12 5se/no 5sec/no 5sec/no 10sec/yes 10sec/yes 10sec/yes Open wire PJF 12 5sec/no 5sec/no 5sec/no 10sec/yes 10sec/yes 10sec/yes As shown, the differences appear to be due to the different sample holder rather than the different operator, although the differences with sample 12 between handy angle and open wire holder were small. The differences are tentatively ascribed to the larger “heat sink” properties of the handy angle holder, over the open wire mesh holder, resulting in somewhat longer ignition times (where indeed ignition did actually occur) with the handy angle holder. Elemental analysis of a flame retarded fabric Due to the surprising result with one FR fabric (3) which ignited in 10 seconds (although it possessed a low flame spread) it was considered desirable to obtain a “Proban” treated cotton fabric (fabric 16) and subject this to elemental analysis to ensure the loading of FR treatment appeared consistent with correct “Proban” treatment. 32
Table A3.3 gives the result of a C, H, N and P analysis fabric 16 (“Proban” treated cotton). Table A3.3 % carbon expressed as C 41.13 41.12 % hydrogen expressed as H 6.29 6.36 % nitrogen expressed as N 2.12 2.02 % phosphorus expressed as P 2.33 2.28 Through discussions with a major supplier manufacturer of “Proban” treated fabrics an elemental phosphorus content of 2.3% to 3% was considered a satisfactory “loading” in this application [6]. 33
34
REFERENCES 1. “FIREX” – HSE Technology Division’s Database. 2. “Hand grinder sparks: Development of a test for ignition and flame spread on work wear. An apparatus and procedure to compare times to ignition.” June 2002. Fardell P.J. BRE Client Report 206550. 3. “Hand grinder sparks: Development of a test for ignition and flame spread on work wear. An apparatus and procedure to compare flame-spread rates. August 2002. Fardell P.J. BRE Client Report 206551. 4. Title 49 – Transportation #571.302 Federal Motor Vehicle Safety Standard (FMVSS) “Standard 302: Flammability of interior fabrics” US Federal Register Vol. 36.N0 232. 5. “Textiles. Commercial laundering procedure for textile fabrics prior to flammability testing. (reduced procedure)”BS EN ISO 10528 :1995. 6. Phosphorus levels in “Proban” treated textiles. Northenden Textiles Ltd., Rengate House, 221 Palatine Road, Didsbury, Manchester M20 2EE. Mr. Tony Purcell (Private Communication). 7. Portwest Clothing Ltd. Market Street, Goldthorpe, Rotherham S. Yorkshire S63 9HB 35
Printed and published by the Health and Safety Executive C30 1/98 Printed and published by the Health and Safety Executive C1.10 05/04
ISBN 0-7176-2841-8 RR 222 78071 7 62841 4 £10.00 9
Annex B MSN 1731 (M+F)
1 MERCHANT SHIPPING NOTICE MSN 1731 (M+F) Summary • This Notice gives notice of new regulations governing the provision of personal protective equip- ment, the Merchant Shipping and Fishing Vessels (Personal Protective Equipment) Regulations
- These Regulations supersede the Merchant Shipping (Protective Clothing and Equipment)
Regulations 1985 (S.I. No. 1664), and come into force on 25 October 1999 • Annex 1 gives the design standards for personal protective equipment in use on board ships, for specified work activities and situations, in order to comply with regulation 5(2)(a) of the new Regulations. Introduction The Merchant Shipping and Fishing Vessels Personal Protective Equipment Regulations 1999 This Merchant Shipping Notice is an integral part of the Merchant Shipping and Fishing Vessels (Personal Protective Equipment) Regulations 1999. Notice to employers of crew, masters, safety officers and safety representatives. This Notice supersedes Merchant Shipping Notices No. M1195 and M1358. 1. The Regulations require employers to ensure that personal protective equipment (PPE) is provided for their workers who are engaged in, or at risk from, a hazardous work activity on board a United Kingdom ship1. 2. The Regulations are subject to the general rule that use of PPE is always a last resort, where risks cannot be avoided or reduced to a safe level by means of collective protection, or safe systems of work. 3. PPE must be provided free of charge to the workers, except that, where use of the equipment is not exclusive to the work place, workers may be required to contribute towards the cost. 1 “worker” includes trainees and apprentices, but does not include persons who are training in a sail training vessel. 4. Where, traditionally, workers provide their own PPE, the employer remains responsible for ensuring that workers are equipped with appropriate PPE, and that they use it when engaged in work of the types outlined in Annex 1. 5. The equipment issued must be “suitable”, which is defined as : (a) in relation to any work process described in [this] Merchant Shipping Notice MSN 1731 (M+F), of the kind and to the standard specified [in that Merchant Shipping Notice], in relation to that work process; (b) appropriate for the risks to which he worker is exposed and to the task which he is performing, without itself leading to any increased risk;
2 (c) correctly fitting the worker, or capable of being adjusted to fit; (d) taking into account ergonomic requirements and the worker’s state of health; and (e) compatible with any other equipment the worker has to use at the same time, so that it continues to be effective against the risk” 6. In addition, the employer must ensure that the PPE supplied is easily accessible, and properly stored and maintained, and that where appropriate, instructions are available to the workers who are required to carry out any maintenance. The equipment must be regularly inspected, in accordance with the manufacturers instructions, and its operation checked. Respiratory protective equipment must be always be checked before and after use. 7. The employer must ensure, so far as is reasonably practicable, that PPE issued under the regulations is used as instructed - eg that workers do not use it for a purpose for which it is not designed, and that it is put on and worn correctly. 8. Workers must receive adequate and appropriate training so that they are aware of the risks against which the PPE is designed to protect them, and of when and how to use it and look after it correctly. This may include demonstrations of the wearing of PPE, where appropriate. 9. Workers are required to wear and use the PPE which has been issued to them when appropriate, and to comply with any training and instruction provided. Standards of design and manufacture 10. The specifications for PPE are set out in the Annex. The list covers the PPE most commonly used on ships, but is not exclusive. 11. The letters “EN” stand for “European Norm”. Where no “EN” standard is available, a BS standard is quoted. The letters “BS” refer to a British Standard. The standards are those to which the clothing and equipment should comply and the date which appears will be the date on which the latest revision of the relevant Standard was published, including all amendments at the date of this Merchant Shipping Notice. 12. Any reference to an EN or BS standard contained in the annex means that standard or an alternative Standard which provides, in use, equivalent levels of safety, suitability and fitness for purpose. 13. The standards of equipment given in this Merchant Shipping Notice do not apply to life saving appliances or other equipment which is subject to the Merchant Shipping (Marine Equipment) Regulations. (S.I. 1999/1957). 14. Publications mentioned in Annex 1 are available from: “BS” and “EN” Specifications: The British Standards Institution 389 Chiswick High Road London W4 4AL The Code of Practice, “Noise Levels in Ships” is available from The Stationery Office. MSPP3 (Seafarers Health and Safety) The Maritime and Coastguard Agency Bay 2/1 Spring Place 105 Commercial Road Southampton SO15 1EG Tel: 01703 329390 Fax: 01703 329251 August 1999 © Crown copyright 1999 [MC 122/6/053] An executive agency of the Department of the Environment, Transport and the Regions
3 ANNEX 1 STANDARDS OF PERSONAL PROTECTIVE EQUIPMENT Note: all protective clothing should conform to EN 340 : 1993 - ‘Protective clothing. General requirements.’ Work activity Protective clothing and equipment to be provided Full title of Standard 1 Any process or activity involving a reasonably foreseeable risk to the head from falling or moving objects. Head protection EN 397 : 1995 Specification for industrial safety helmets. 2. When working in areas where the circumstances involve a reasonably foresee- able risk to the head from bruising or abrasion. Scalp protection to EN 812 : 1997 Industrial bump caps. 3. When entering or working in a space or working with machinery or equipment where the noise level exceeds 85dB(A). Hearing protection complying with section 10 and appendix 3 of the Code of Practice for Noise Levels in Ships published by the Department of Transport (1990): EN 352-1 : 1993 EN 352- 2 : 1993 EN 352- 3 : 1996 EN 458 : 1994 Ear muffs. Ear plugs. Ear muffs attached to an industrial safety helmet. Hearing protectors. Recommen- dations for selection, use, care and maintenance. 4. Welding and gas cutting. Eye and face protection to EN 175 : 1997 Personal protection. Equipment for eye and face protection during welding and allied processes. EN 166 : 1995 Personal eye protection. Specifications. EN 379 : 1994 Specification for filters with switchable or dual luminous transmittance for personal eye protectors used in welding and similar operations. EN 169 : 1992 Specification for filters for personal eye protection equipment used in welding and similar operations.
4 Work activity Protective clothing and equipment to be provided Full title of Standard Body protection to EN 470-1 : 1995 Additional protection may be required in some situations (eg for particularly intense welding/cutting operations) Protective clothing for use in welding and allied processes. General requirements. Electric arc welding (in addition to above) Safety footwear to BS 7193 Specification for lined lightweight rubber overshoes and overboots 5. Any work activity in which there is a reasonably foreseeable risk of injury to the eye from particles, frag- ments or injurious substances. Eye protection to EN 166 As above. 6. a) Any work activity involving working in an atmosphere which is likely to be hazard- ous to health. Protection against nuisance dust mist, particles and dust of low toxicity. Note - The following items should be selected and maintained according to BS 4275 : 1997 Disposable dust respirators conforming to EN 149 : 1991 General purpose dust respirators conform- ing as appropriate to one of the following: EN 136 : 1998 EN 140 : 1998 EN 141 : 1990 EN 143 : 1990 EN 371 : 1992 EN 372 : 1992 EN 1827: 1999 Guide to implementing an effective respiratory protective device programme. Specification for filtering half- masks to protect against particles. Respiratory protective devices: Full face masks. Respiratory protective devices: Half masks and quarter masks Respiratory protective equipment: Gas filters and combined. Specification for particle filters used in respiratory protective equipment. Specification for AX gas filters and combined filters against low boiling organic compounds used in respiratory protective equipment. Specification for SX gas filters and combined filters against specific named compounds used in respiratory protective equipment. Half masks without inhalation valves, with separate filters to protect against gases or gases and particles or particles only.
5 Work activity Protective clothing and equipment to be provided Full title of Standard b) Protection against toxic dusts and gases of low toxicity. Respirators conforming as appropriate to one of the following: BS 7355 (EN 136) BS 7356 (EN 140) EN 141 EN 143 EN 371 EN 372 EN 405 : 1992 Note: particulate filters may be incorporated for some applications. As above. As above. As above. As above. As above. As above. Valved filtering half masks for gases or gases and particles. EN 1827: 1999 Half masks without inhalation valves, with separate filters to protect against gases or gases and particles or particles only. c) Protection against toxic dust. Powered dust respirators, powered dust hoods and blouses conforming as appropriate to one of the following: EN 136 EN 143 EN 12942: 1998 EN 12941: 1998 As above (note: this only applies to the mask). As above. Specification for power assisted particle filtering devices incorporating full face masks, half masks or quarter masks. Respiratory protective devices. Specification for powered particle filtering devices incorporating helmets or hoods. d) Protection against highly toxic atmospheres; or where there is oxygen deficiency; or as an alternative to the items above, where suitable. Breathing apparatus conforming to: EN 1146 : 1997 (for self-rescue only) “Escape sets” Respiratory protective devices for self rescue. Self contained open- circuit compressed air breathing apparatus incorporating a hood (compressed air apparatus with hood). Requirements, testing, marking.
6 Work activity Protective clothing and equipment to be provided Full title of Standard EN 137 : 1993 Specification for respiratory protective devices: self contained open-circuit compressed air breathing apparatus. EN 138 : 1994 Respiratory protective devices. Fresh air hose breathing apparatus for use with full face mask, half mask or mouthpiece assembly. EN 139 : 1994 Respiratory protective devices. Compressed air line breathing apparatus for use with a full face mask, half mask or mouthpiece assembly. Requirements, testing, marking. EN 269 : 1994 Respiratory protective devices. Powered fresh air hose breathing apparatus incorporating a hood. EN 270 : 1994 Respiratory protective devices. Compressed air line breathing apparatus incorporating a hood. Requirements, testing, marking. EN 271 : 1995 Respiratory protective devices: Compressed air line or powered fresh air hose breathing apparatus incorporating a hood for use in abrasive blasting operations. EN 402 : 1993 Respiratory protective devices for escape. Self contained open-circuit compressed air breathing apparatus with full face mask or mouthpiece assembly. 7. Any process or activity involving working in an area where there is a reasonably foreseeable risk of injury from substances which are corro- sive or likely to be absorbed through the skin. Protective overalls, gloves or head gear, whichever is appropriate: EN 340 : 1993 EN 465 : 1995 Protective clothing: General requirements. Protective clothing. Protection against liquid chemicals. Performance requirements for chemical protective clothing with spray-tight connections between different parts of the clothing (Type 4 equivalent).
7 Work activity Protective clothing and equipment to be provided Full title of Standard EN 466 : 1995 EN 467 : 1995 Protective clothing. Protection against liquid chemicals. Perfor- mance requirements for chemical protective clothing with liquid-tight connections between different parts of the clothing (Type 3 equivalent). Protective clothing. Protection against liquid chemicals. Performance requirements for garments providing protection to parts of the body. 8. Any process or activity involving a reasonably fore- seeable risk of injury to the hands unless the use of hand protection would increase the risk. Hand protection conforming as appropriate to : EN 374 Protective gloves against chemicals and micro-organisms. EN 374-1 : 1994 Terminology and performance requirements. EN 374- 2 : 1994 Determination of resistance to penetration. EN 374- 3 : 1994 Determination of resistance to permeation by chemicals. EN 388 : 1994 Protective gloves against mechanical risks. EN 407 : 1994 Protective gloves against thermal risks EN 420 : 1994 General requirements for gloves. EN 511 : 1994 Protective gloves against cold. 9. Any process or activity involving particular risk of injury to the feet. Foot protection conforming to : EN 345 ; or Safety footwear for professional use. EN 346, whichever is appropriate: Protective footwear for professional use. EN 345- 1 : 1992 Specification. EN 345- 2 : 1996 EN 346- 1 : 1992 Additional specifications. Specification. EN 346-2 : 1996 Additional specifications. EN 347-1 : 1992 Occupational footwear for professional use. EN 347-2 : 1996 Additional specifications.
8 Work activity Protective clothing and equipment to be provided Full title of Standard
- Work aloft or in any other
area where there is a reason- ably foreseeable risk of falling a distance of more than 2 metres. Safety belt or harness and associated lanyard conforming to the following: EN 353-1 : 1992 EN 353- 2 : 1992 EN 354 : 1992 EN 355 : 1992 EN 360 : 1992 EN 361 : 1992 EN 362 : 1992 EN 363 : 1992
- or where the use of portable ladders is
necessary, such ladders to be used in accordance with Chapter 15 of the Code of Safe Working Practices for Merchant Seamen. Specification for guided type fall arresters on a rigid anchorage line. Specification for guided type fall arresters on a flexible anchorage line. Personal protective equipment against falls from a height. Lanyards. Personal protective equipment against falls from a height. Energy absorbers. Personal protective equipment against falls from a height. Retractable fall arrangements. Personal protective equipment against falls from a height. Full body harnesses. Personal protective equipment against falls from a height. Connectors. Personal protective equipment against falls from a height. Fall arrest systems.
- Any work carried out from an
overside position or in an ex- posed position where there is reasonably foreseeable risk of falling or being washed over- board or any work carried out in or from a ship’s boat. A lifebuoy with sufficient line attached ready for immediate use and either a Maritime and Coastguard Agency approved lifejacket or a lifejacket conforming as appropriate to one of the following, taking into account the area of operation: EN 394 : 1994 EN 396 : 1993 Life jackets and personal buoyancy aids. Additional items. Life jackets and personal buoyancy aids. Life jacket 150.
9 Work activity Protective clothing and equipment to be provided Full title of Standard EN 399 : 1993 Partially inherent lifejackets must have at least 89 N of inherent buoyancy; and with the inflatable sections relying on automatic inflation. Life jackets and personal buoyancy aids. Life jacket 275.
- Any work activity where it is
necessary to carry out repair or maintenance work on or near exposed live electrical equipment and there is a reasonably foreseeable risk of injury. Rubber gloves conforming to: BS 697 : 1986 EN 60903 : 1992 Protective sleeves conforming to EN 60984 : 1993 An insulating mat (except where specially insulated flooring is installed) conforming to BS 921 : 1976 Rubber soled footwear (no standard necessary). Note - gloves, sleeves and mats should protect against the appropriate voltage. Specification for rubber gloves for electrical purposes [4 classes of gloves rated at 650v and above] Gloves and mitts of insulating material for live working. Sleeves of insulating material for live working. Specification. Rubber mats for electrical purposes.
- Any work activity involving
a reasonably foreseeable risk of injury from vehicle move- ment eg during ro-ro operations. Suitable high-visibility garment conforming to EN 471 : 1994 Specification for high-visibility warning clothing.
- Any work process involving
exposure to heat EN 531 : 1995 Protective clothing for industrial workers exposed to heat (excluding fire-fighters’ and welders’ clothing).
- Work in engine rooms or any
area where there is a risk of fire. Overalls made of fabric of low flammability - eg
- natural fibre, high cotton content;
- non-flammable clothing
as appropriate Cotton or cotton and polyester clothing with flame-retardant finishes are available to protect against sparks and flame.
FD06038 | 2010_英国_MAIB_man-overboard-from-twin-rig-trawler-aquarius-with-loss-of-1-life__Aquarius_CombinedAnnexes.pdf
分类:06_境外及港澳台调查报告 | 年份:2010 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
Annex A Annang Nuertey (deceased) contract of employment
Annex B MGN 430 (F) Checks on Crew Certification and Drills
Maritime and Coastguard Agency Logo
MARINE GUIDANCE NOTE
MGN 430 (F)
FISHING VESSELS: Checks on Crew Certification and Drills
Notice to all Owners, Operators, Managing Agents, Skippers and Crew This Note should be read in conjunction with MGN 411 - Training and Certification Requirements for the Crew of Fishing Vessels and their applicability to Small Commercial Vessels and Large Yachts, MSN 1770, The Code of Safe Working Practices for the Construction and Use of 15m Length Overall to less than 24m Registered Length Vessels, the Fishing Vessels (EC Directive on Harmonised Safety Regime) Regulations 1999, No.2998 as amended by SI 2003/1112 and the Fishing Vessels (Safety Provisions) Rules 1975, as amended.
PLEASE NOTE:- Where this document provides guidance on the law it should not be regarded as definitive. The way the law applies to any particular case can vary according to circumstances - for example, from vessel to vessel and you should consider seeking independent legal advice if you are unsure of your own legal position.
Summary. This Note provides guidance on the checks that MCA surveyors will make regarding crew certification and drills. Surveyors will:
• ensure that the correct Certificates of Competency are held and Safety Training courses have been undertaken by skippers and crew; • check that written health and safety policies are in place and completed risk assessments have been carried out. • witness emergency drills as part of the Renewal and Intermediate surveys on the vessel or at any other time as deemed necessary by the MCA. • confirm that emergency drills (Fire, Collision/Grounding, Man Overboard, Abandon ship, Anchoring) are practiced monthly and when a new crew member joins the vessel. • if practicable, and when there is no evidence that drills have been conducted and it is considered the crew are not trained for an emergency, ask vessels to proceed from the harbour to a safe anchorage to undertake anchoring drills. This increases the validity of the drill and provides a more challenging, realistic environment.
The Note sets out various scenarios for different types of emergency drills, which the MCA surveyors may ask to see, sets out what the crew need to demonstrate and the key issues (Cont over.)
- 1 -
a surveyor will be looking at. The Note sets out the guidance on possible requirements of skippers and crew during emergencies which can be demonstrated during drills and musters. It should be noted that this guidance is generic and it is the owner, skipper and crew who should decide what steps are necessary and who should undertake them.
Fishing vessels – Crew certification and emergency drills
Introduction 1.1. The Marine Accident Investigation Branch (MAIB) report entitled “Analysis of UK Fishing Vessel Safety 1992 to 2006” recommends that the MCA ensures that the current mandatory training requirements for fishermen are strictly applied. Other accident reports have highlighted the lack of emergency procedures and the need to carry out drills which are a statutory requirement. Owners, skippers and crew should note that it is the flag state’s responsibility (i.e. the MCA for UK flagged vessels) to take such measures as it may deem necessary to ensure that crews are adequately trained in their duties in the event of emergencies.
Actions by Surveyors 2.1 Surveyors who undertake surveys or inspections on fishing vessels will check the following documents in particular before endorsing or renewing United Kingdom Fishing Vessel Certificates or International Fishing Vessel Certificates.
• Certificates of Competency for the Deck and Engineer Officers. Details of specific requirements are contained within the Fishing Vessels (Certification of Deck Officers and Engineer Officers) Regulations 1984 SI No. 1984/1115.
• Certificates of Equivalent Competency for Deck and Engineer Officers. Details of specific requirements are set out in the Fishing Vessels (Certification of Deck Officers and Engineer Officers) Regulations 1984 SI No. 1984/1115 and MSN 1825 (F) Certificates of Equivalent Competency: Fishing Vessels.
• Certificates confirming that fishermen not holding Certificates of Competency have attended the basic safety training courses listed in the Fishing Vessels (Safety Training) Regulations 1989 SI No. 1989/126.
- 2
Further guidance on the requirements set out in 2.1 above can be found in MGN 411.
- 3
Surveyors will also check that when the crew is greater in number than five, there is in place a written health and safety policy and that risk assessments have been completed for the various operations undertaken on board. Both these requirements are contained within SI No. 1997/2962 - Merchant Shipping and Fishing Vessels (Health and Safety at Work) Regulations 1997. Without a written policy and assessments, operators will have no evidence or defence that they have actually met their obligations.
- 4
Attending surveyors will also witness the crew undertaking suitable emergency drills. Guidance for surveyors, skippers and crew specific to fishing vessels is annexed to this notice. If practicable, and when there is no evidence that drills have been conducted and it is considered the crew are not trained for an emergency, vessels will be asked to proceed from the harbour to a safe anchorage to undertake anchoring drills. This increases the validity of the
- 2 -
drill and provides a more challenging, realistic environment. The attending survey will take into account the weather conditions and other safety aspects when deciding if the vessel will be asked to proceed from harbour for a drill.
- 5
In addition, attending surveyors will satisfy themselves that the emergency drills as required by either the Fishing Vessels (EC Directive on Harmonised Safety Regime) Regulations 1999 SI No. 1999/2998 as amended, the Fishing Vessel (Safety Provisions) Rules 1975 SI No. 1975/330 as amended or by MSN1770(F) have been carried out and correctly documented.
- 6
Providing that all of the above are found to be satisfactory and in accordance with the relevant legislation for vessels of 15m Length overall and above, the vessel’s certificate may be renewed/endorsed. If however any of the above is found to be unsatisfactory or not proven then it will be noted on the Report of Inspection/Survey as a deficiency and the vessel’s certificate will not be renewed or endorsed until drills are completed satisfactorily.
Action by Owners
- 7
In respect of fishing vessels of less than 15m Length Overall, from 1 July 2010 the MCA now issues a Small Fishing Vessel Certificate. If your vessel was inspected on or after this date you will be required to present a copy of this Certificate to the Register of Shipping and Seamen (RSS) as proof of compliance with the Small Fishing Vessel Code MSN 1813 when registering or re-registering your vessel. Vessels inspected before 1 July 2010 will need to present the Report of Inspection (MSF 1606) which would have been provided to the owner at the time.
More Information
Fishing Vessels Safety Unit Vessel Policy Branch Maritime and Coastguard Agency, Bay 2/30 Spring Place, 105 Commercial Road, Southampton, SO15 1EG.
Tel :
+44 (0) 23 8032 9154. Fax :
+44 (0) 23 8032 9104. e-mail:
fishing @mcga.gov.uk.
General Inquiries: infoline@mcga.gov.uk .
MCA Website Address: www.mcga.gov.uk .
File Ref:
MS88/1/426
Published:
January 2011
Please note that all addresses and
telephone numbers are correct at time of publishing.
© Crown Copyright 2011.
Safer Lives, Safer Ships, Cleaner Seas.
When printed by the MCA the material used contains a minimum 75% post-consumer waste paper
- 3 -
Annex to MGN 430 - Fishing vessels – Crew certification and emergency drills
The investigations by the MAIB include incidents where crews have had to abandon ship in extremely poor weather conditions. One vessel grounded on a lee shore with engine trouble, another caught fire, and another took on a great deal of water whilst preparing to fish in heavy weather.
It is mandatory that emergency drills be carried out monthly on all United Kingdom fishing vessels over 15 metres Length Overall and a record of these drills should be entered into the vessel’s log book. An entry should be made if one of these drills has been missed along with a reason why. An emergency drill should also be carried out when a new crew member joins the vessel.
The following is guidance for musters and drills witnessed during inspections and surveys.
The emergency drill could take the form of:-
• Engine Room, Accommodation or Factory Deck Fire; • Collision/ Grounding; • Man Overboard; • Abandon ship; and • Emergency Anchoring
The drill should refresh basic safety training and add an element of reality of working as part of a team onboard their own vessel. In witnessing a safe and effective drill, it is important that as many of the regular crew are present as possible.
Drills cannot replace the written risk assessment but are a vital part of the necessary control measures within that risk assessment.
It is essential that all crew members undertake drills and play their part in the safe day to day running of the vessel.
- 4 -
Anchor Drill
Purpose
If practicable, and taking into account the considerations in paragraph 2.4 of this MSN, the vessel will proceed from the harbour or dock to a safe anchorage position where an anchoring drill will be carried out.
The crew will demonstrate:
• that the vessel can safely deploy and recover an anchor within a reasonable time to simulate an emergency anchoring scenario; and
• the deployment of the anchor, with the crew dressed suitably including gloves and correctly donned lifejackets.
Scenario
The vessels steering gear has failed in the fairway into a busy harbour. Bring the vessel to anchor and show the correct day signal.
Key Issues
The key issues are:
• crew dressed in Personal Protective Equipment (PPE);
• anchor handling and methodology safe;
• anchor cable marked to show length of cable deployed;
• crew aware of length of cable remaining onboard;
• communication between wheelhouse and anchor party acceptable; and
• anchor deployed safely and operation acceptable.
- 5 -
Muster Stations Drill
Purpose
The crew will demonstrate:
• awareness of their personal muster station and that they can don a lifejacket quickly and correctly;
• that those allocated to the lifeboat or liferaft deck can prepare a liferaft for manual launching; and
• that those responsible for other duties undertake them quickly and competently.
Scenario
The vessel will simulate working conditions as if the vessel were fishing with crew asleep in cabins. The crew alarm will be activated and the crew will go to muster stations dressed appropriately to abandon ship, with warm clothing and lifejackets correctly donned.
Crew “asleep” in the cabin will exit the cabin using the emergency escapes. The “duty watch” will close all doors and vents on way to the muster station.
Key Issues
The key issues are:
• crew alarm activated and suitable;
• crew to correct muster stations;
• crew suitably dressed in warm clothing and lifejackets;
• liferafts made ready for deployment;
• duties as posted on Muster List completed; and
• stowage of lifejackets, risks understood and acceptable.
The crew will be accounted for and a report made to the skipper.
Liferafts will be “made ready” to deploy manually but will not be deployed.
Lifejacket Storage Position
Careful thought needs to go into deciding where to store the lifejackets, they need to be stored where there is airflow and where they will not get damp. Access to the lifejackets should be the main concern of the crew, they will be using emergency exits and access to inside the vessels should not be allowed. Can the crew therefore access the lifejackets easily?
Lifejacket donning instructions should relate to the lifejacket types carried on the vessel. More than one type of lifejacket means displaying more than one type of lifejacket donning instructions which need to be displayed where the lifejackets are stored and in crew areas.
- 6 -
Misuse of the Emergency Alarm
The emergency alarm should be distinctly different from the call system used to call the crew out on deck to haul the gear.
- 7 -
Fire Drill
Purpose
To demonstrate:
• knowledge of ship board equipment and vents;
• donning and use of breathing equipment;
• practical use of hoses and nozzles;
• safety considerations; and
• use of fixed fire suppression gas systems.
During this fire drill the main fire fighting hoses will be deployed and demonstrated. Once the surveyor is satisfied that the condition of the hoses and nozzles are to standard then the vessel will simulate “dead ship” and the emergency lights, fire hoses and equipment will be tested.
Scenario
Fire reported in area of high fire risk e.g. engine room, galley or spaces with electrical heaters. Prepare to fight the fire and prevent the fire from spreading to other areas of the vessel.
Key Issues
The key issues are
• knowledge of shipboard fire fighting equipment;
• all vents closed and fans stopped;
• fire mains and hoses proved;
• emergency pumps and hoses proved;
• breathing equipment and safety procedures acceptable;
• use of gas suppression systems understood and appreciated; and
• limitations of fire fighting equipment carried appreciated.
- 8 -
Man Overboard Drill
Purpose
To demonstrate
• that the crew can conduct an effective search of the vessel;
• the crew are able to quickly launch the rescue boat to recover a person from the water; and
• the rescue boat crew are aware of the effects of hydrostatic squeeze and how it will affect a casualty suffering from hypothermia.
Scenario
The crew will undertake a “man overboard” drill and will launch and man the rescue boat. The rescue boat will be readied and swung out to a side specified by the attending surveyor and launched into the water in a safe and controlled manner.
A member of the crew is believed to fallen overboard and has not been seen for some time. The attending surveyor will indicate when this crew man was last seen and if the crewman was seen to have fallen overboard.
Key Issues
The key issues are
• rescue boat stores to correct scale (as applicable) and serviceable;
• rescue boat launched in safe manner, crew suitably dressed;
• rescue boat and davit in serviceable condition; and
• search undertaken of vessel for missing crew member.
On completion of this drill the rescue boat will be recovered to the vessel and readied for immediate use.
Man Overboard Recovery System
There are several “man overboard” recovery systems in use on board fishing vessels at this time, Jason’s Cradle and Markus Net to name just two. These systems are permitted to replace rescue boats only when an exemption has been applied for and granted.
Crews should be well trained in the use of these systems and appreciate the limitations of the use of these recovery systems in poor weather conditions as well as fine.
Key Issues
The key issues are:
• system inspected and serviced;
• crew well trained in the use of the system carried;
- 9 -
• system deployed correctly;
• first aid requirements anticipated; and
• system re-stowed and readied for immediate use.
- 10 -
Annex 2 – Guidance on Drills for different types of emergencies
Man Overboard Guidance
The following provides guidance on the actions of the vessel’s skipper and crew. These actions are generic and may vary from vessel to vessel and it is recommended that you identify the requirements particular to your vessel through practice drills.
General Requirements of All:
• Sound Crew Alarm.
• Crew to muster stations with warm clothing and lifejackets donned correctly.
• Was the crewman seen to have fallen overboard? Yes / No.
• If yes, throw lifebuoy with smoke / light float attached to mark position.
• If no, note time and position and consider using smoke / light float anyway to mark a datum position. This will give a visual marker to searching vessels and aircraft as an indication of the tide and surface water movement in the search area from a given time.
Skipper:
• Press MOB function on Navigational aid, if fitted and crew alarm.
• Inform ships mate with all details.
• Send DSC alert and commence voice transmission on VHF, MF or HF as appropriate.
• Inform Coastguard of any updated information and the description of missing person.
• Haul fishing gear if fishing.
• If not fishing and navigation allows commence Williamson turn.
• Pass any additional information to the Coastguard and any other vessels assisting.
• Keep all search units up to date by sending situation reports regularly.
Mate:
• Crew muster report to skipper, crewman missing? Yes / No.
• Collect details of missing crewman and pass to skipper as soon as possible, time and place last seen, clothing type and colours, age and state of health.
• Ensure crew are dressed appropriately.
• Post lookouts forward, wing of the bridge port and starboard also on a high point aft.
• Search vessel for missing crewman and prepare to launch rescue boat if
- 11 -
carried.
• Organise man overboard recovery system.
• Organise dry clothing and first aid equipment, prepare to treat for hypothermia.
- 12 -
Fire Fighting Guidance
The following provides guidance on the actions of the vessel’s skipper and crew. These actions are generic and may vary from vessel to vessel and it is recommended that you identify the requirements particular to your vessel through practice drills.
General Requirements of All:
• Sound Crew Alarm.
• Crew to muster stations with warm clothing and lifejackets donned correctly.
Skipper:
• Account for all crew, and send DSC alert and follow with voice transmission on VHF, MF or HF.
• Consider manual launching of liferafts.
• In receipt of all available information consider fighting the fire.
• Monitor vessel stability with engineer regarding water used for fire fighting.
• Consider emergency fuel stops, before activation, consider how power loss affects the crew’s fire fighting capability. Loss of main fire hoses and lighting.
• Prior to use of CO2 gas or other fixed fire fighting medium, order compartments to be cleared and checked, all crew evacuated from effected area.
• Ensure CO2 or other fixed fire fighting medium, firing point is evacuated in case gas leaks from bottles and valves.
• On receipt of the regular situation reports which indicate that the fire is now out of control, consider abandoning the vessel to the liferafts, (proceed to abandon ship).
Mate:
• Crew muster report to skipper.
• If liferafts deployed ensure access for boarding and safety of the raft from heat and smoke.
• Take charge of fire fighting parties.
• Close all ventilation flaps and doors to engine room, accommodation, galley and factory deck.
• Delegate crew member to don fireman’s outfit and breathing gear if carried.
• If crew numbers allow delegate first aid party and a safe, warm and dry compartment for any injured crew to rest and receive treatment.
• Give regular situation reports to skipper.
- 13 -
Engineer:
• Stop all fans in and around affected and adjacent compartments.
• Ascertain extent and severity of the fire and report to the skipper; assist the mate where possible with fire fighting parties.
• Check water ingress into compartments from fire hoses and fire fighting appliances.
• Prime emergency fire hoses and pumps as these may be required if emergency fuel stops activated.
- 14 -
Taking Water or Sinking Guidance
The following provides guidance on the actions of the vessel’s skipper and crew. These actions are generic and may vary from vessel to vessel and it is recommended that you identify the requirements particular to your vessel through practice drills.
General Requirements of All:
• Sound Crew Alarm.
• Crew to muster stations with warm clothing and lifejackets donned correctly.
Skipper:
• Send DSC alert on appropriate frequency.
• Follow with voice transmission on appropriate frequency.
• If call for assistance is answered request portable pumps.
• Consider if pumps are going to cope.
• Consider evacuation of non essential crew members.
• Consider ‘abandon ship’ (go to ‘abandon ship’).
Mate:
• Muster details to skipper.
• On the instructions from the skipper deploy the liferafts and rescue boat if carried.
• Secure liferafts in safe area on vessel and provide safe means of boarding.
• Keep skipper informed on progress.
Engineer:
• Check compartments for water ingress.
• Monitor bilge alarms.
• Maintain bilge pumps.
• Keep skipper informed of progress of pumps and water levels.
• Advise skipper on stability state of the vessel.
• Advise skipper on possible future of water levels and speed of water ingress.
• Advise skipper if additional pump would make a difference.
• Close all oil and fuel vents to try to prevent pollution.
- 15 -
Collision or Grounding Guidance
The following provides guidance on the actions of the vessel’s skipper and crew. These actions are generic and may vary from vessel to vessel and it is recommended that you identify the requirements particular to your vessel through practice drills.
General Requirements of All:
• Sound Crew Alarm.
• Crew to muster stations with warm clothing and lifejackets donned correctly.
Skipper:
• Send DSC Alert VHF, MF or HF.
• Transmit voice message on appropriate radio frequency.
• Check with mate on status of crew.
• Check with engineer on status of hull integrity.
• Check with other vessel if collision, on status of hull integrity and injuries to crew.
• Decide if evacuation to other ship is necessary or their crew to your vessel.
• If aground consider deploying stern anchors.
• Try to establish depth of water around the vessel and in which direction lies deeper water.
• Consider deployment of liferafts / rescue boat.
• Consider ‘abandon ship’ to liferafts (go to ‘abandon ship’).
Mate:
• Report muster details to skipper.
• Check for injured or trapped crewmen.
• Investigate watertight integrity of your vessel.
• Delegate work party to try to stop ingress of water.
• Keep skipper informed of progress.
Engineer:
• Start bilge pumps and monitor bilge alarms.
• Try to establish what damage has been sustained.
• Assist mate with designated work party to stop any ingress of water.
• Instigate frequent reports to skipper.
- 16 -
Abandon Ship Guidance
The following provides guidance on the actions of the vessel’s skipper and crew. These actions are generic and may vary from vessel to vessel and it is recommended that you identify the requirements particular to your vessel through practice drills.
General Requirements of All:
• Sound Crew Alarm.
• Crew to muster stations with warm clothing and lifejackets donned correctly.
Skipper:
• Issue order to ‘abandon ship’ by verbal order to mate and / or over ship’s intercom system.
• Crew go to liferaft embarkation points, not returning to cabins to get personal items.
• To ensure all crew are accounted for and have embarked liferafts.
• DSC alert sent and voice transmission to include the fact that crew are abandoning the vessel to liferafts, position, number of crew and any crew with injuries.
• Deploy EPIRB and SART if carried.
• Take charge of liferaft number 1, collect remaining VHF portable radio, log book and remaining equipment in grab bags, consider additional water for injured crewmen.
Mate:
• Account for all crew members and report to skipper.
• Supervise deployment of liferafts, pay due care to weather conditions for boarding.
• Supervise deployment of rescue boat if carried.
• Supervise embarkation of liferafts and account for all crew members boarding rafts as indicated on muster list.
• Tether liferafts (and the rescue boat if carried) together.
• Take command of liferaft number 2 taking additional grab bag, first aid kit, portable VHF radio and flares.
Abandoning the Vessel
If possible survival craft should be boarded dry, but if it is necessary to abandon a vessel by jumping directly into the water, the following procedure should be followed.
Hold lifejacket, block off nose and mouth, keep feet together, check below, avoid obstructions,
- 17 -
jump feet first, look ahead parallel to horizon, attempt to land near and slightly ahead of survival craft. Do not jump into boats or on top of liferafts, the contents could cause you serious injury.
In the Water
A survivor in the water should swim away from a sinking vessel as quickly as possible since when it founders wreckage and debris may surface with great force along with oil.
Get out of the water as soon as possible and remember swimming increases the rate of heat loss, try to avoid any likelihood of hypothermia.
- 18 -
Annex 3 – Muster Lists explained
Muster List
Muster lists are to inform the seaman where to go and what to do in the event of an alarm and one of the first tasks of a new crew member is to find out where he is expected to muster and his duties in the event of an alarm sounding.
The lists should contain the information required to muster the crew together at any given moment. Use of bunk or cabin numbers will enable the crew to establish their muster point and save you time on making new lists when crew leave or join the vessel. Don’t forget to allow for additional crew members or other persons carried. Keep muster points to a minimum and in areas easily monitored from the wheel house.
Lists should also clearly state initial duties and responsibilities in the case of an emergency. Crew mustered at the liferafts deck should prepare the liferafts for manual launching when the command has been given. The Chief Engineer will close up engine room and ensure all vents and fans throughout the vessel are shut down.
The pages at the end of this notice contain muster lists for vessels with small or large crew numbers.
Muster lists are in three stages which are:
Stage 1: Muster Station
At the sounding of any alarm the crew will dress in warm clothing suitable to abandon ship and a lifejacket (with light) donned appropriately and proceed to allocated muster stations and remain there until released. Crewmen turning up with T-shirts will not last long in a liferaft in the winter and even summer nights can be cold enough to induce hypothermia.
En-route to their muster stations all crew will close and secure doors, ventilators and undertake their emergency task before arrival at their muster station. Crew allocated a muster station at a liferaft or lifeboat stowage position will prepare the craft for manual deployment, not deploying until ordered to do so by the skipper or ship’s officer.
Consideration should be given both to the boarding of the liferafts when deployed and the positioning of boarding ladders may be beneficial.
The actions for Stage 2 will vary depending on the nature of the emergency. Therefore two options for Stage 2 are set out below.
Stage 2: Fire Fighting
Once all the crew have been accounted for and liferafts / lifeboats deployed and readied for use the crew guided by the mate will undertake fire fighting duties as detailed and practiced. At least two crew members should be allocated to breathing apparatus and the safety line signals should be known by all. The skipper will be busy enough transmitting safety or distress traffic on the vessel’s radio equipment. Ensure all vents are closed including those which may be within the winch or other deck housing; all vent fans should be stopped.
A further muster of the crew should be undertaken before firing of the CO2, or other fire smothering gas, to ensure that no persons are in the space about to be filled with the gas. Evacuation of the immediate area of the gas bottles should also be considered due to possible leaks from the valves. Gas bottles should be checked to confirm that the gas from all bottles has been deployed, a “tell tale” sign would be “frosting” of the bottom of each bottle.
- 19 -
Stage 2: Man Overboard
Lookouts should be posted and communications agreed; the first aid kit, recovery system and blankets should be available and deployed. A course should be plotted, reversed and Pan Pan or Mayday DSC alert and voice broadcast sent. The crewman who is suspected to have fallen overboard should be identified and the crew questioned as to last sighting of this person.
The vessel should be searched to ensure that the crewman is not still on board.
Stage 3: Abandon Ship
The order is to be given by the skipper or master and relayed to the crew via the mate or ship’s officers. Where possible announcements by tannoy should be avoided as it is likely to induce panic. Information should be given on the muster list as to which liferaft or lifeboat that each crew member is assigned.
At the order given by the skipper the crew will prepare to abandon ship, no crew member will be given access to the inside of the vessel but will proceed to their designated liferaft or lifeboat. All lifeboats or liferafts should be launched if possible and manned, not forgetting the EPIRB, additional first aid kit, additional distress flares, portable VHF radios and the SARTs if carried. Some crew members will have been allocated special tasks, deploy EPIRB or take additional flares, first aid kit or SART.
The liferafts should be secured together where possible and remain in the vicinity of the vessel or the last known position which was broadcast with the distress message or DSC information. Consideration should be given to a “grab bag” prepared with “goodies” such as bottled water and tinned high energy chocolate or sugar sweets. Remember survival course training regarding safety and hypothermia.
- 20 -
The following pages are examples of muster lists. You should prepare your own muster lists based on your own vessel layout, equipment and number of crew.
Muster List (Larger Vessels) Name of Fishing Vessel: Crew Member Stage 1 Muster at muster station with warm clothing and lifejacket securely fastened Stage 2 Form work parties to save the ship and attend to casualties Stage 3 Abandon ship on verbal order of the skipper
Muster Point Emergency Parties Abandon Ship Skipper Muster point 1. Wheel House Don lifejacket. Inform Coastguard by radio. Maintain communications with Coastguards. Issue Verbal command Broadcast Mayday. Deploy EPIRB and portable VHF. Ensure all crew has embarked to liferafts. Take charge of liferaft No 1. Mate Muster point 1. Wheel House Don lifejacket Account for all crew.
Take charge of emergency parties. Broadcast to crew, abandon ship to liferafts. Deploy first aid kit, flares, SART and take charge of liferaft No 2. Bunk 3 Engineer Muster point 2. Boat Deck Don lifejacket. Ready liferafts for deployment. Under mates direction undertake first aid duties. Deploy liferaft to lee side of vessel, secure painter. Abandon ship to liferaft 1. Bunk 4 Muster point 2. Boat Deck Don lifejacket. Ready liferafts for deployment. Under mates direction.
Deploy liferaft to lee side of vessel, secure painter. Abandon ship to liferaft 2. Bunk 5 Muster point 3. Fish Room Hatch Don lifejacket await further orders. Under mates direction. Abandon ship to liferaft 1. Bunk 6 Muster point 3. Fish Room Hatch Don lifejacket await further orders. Under mates direction. Abandon ship to liferaft 2. Bunk 7 Muster point 3. Fish Room Hatch Don lifejacket await further orders. Under mates direction. Abandon ship to liferaft 1. Bunk 8 Muster point 3. Fish Room Hatch Don lifejacket await further orders. Under mates direction. Abandon ship to liferaft 2. Bunk 9 Muster point 3. Fish Room Hatch Don lifejacket await further orders Under mates direction. Abandon ship to liferaft 1. Bunk 10 Muster point 3. Fish Room Hatch Don lifejacket await further orders. Under mates direction. Abandon ship to liferaft 2. Bunk 11 Muster point 3. Fish Room Hatch Don lifejacket await further orders. Under mates direction. Abandon ship to liferaft 1. Bunk 12 Muster point 3. Fish Room Hatch Don lifejacket await further orders. Under mates direction. Abandon ship to liferaft 2. Additional Crew Muster point 2. Fish Room Hatch Don lifejacket await further orders. Under mates direction. Abandon ship to liferafts as directed by the mate.
21 -
22 - Muster List (Smaller Vessels) Name of Fishing Vessel: Crew Member Stage 1 Muster at muster station with warm clothing and lifejacket securely fastened Stage 2 Form work parties to save the ship and attend to casualties Stage 3 Abandon ship on verbal order of the skipper Muster Point Emergency Parties Abandon Ship Skipper Muster point 1. Wheel House Don lifejacket. Inform Coastguard by radio. Maintain communications with Coastguards. Issue Verbal command Broadcast Mayday. Deploy EPIRB and portable VHF. Ensure all crew has embarked to liferafts. Take charge of liferaft No 1. Mate Muster point 1. Wheel House Don lifejacket account for all crew. Take charge of emergency parties. Broadcast to crew, abandon ship to liferafts. Deploy first aid kit, flares, SART and take charge of liferaft No 2. Bunk 3 Engineer Muster point 2. Boat Deck Don lifejacket. Ready liferafts for deployment. Under mates direction undertake first aid duties. Deploy liferaft to lee side of vessel, secure painter. Abandon ship to liferaft 1. Bunk 4 Muster point 2. Boat Deck Don lifejacket. Ready liferafts for deployment. Under mates direction. Deploy liferaft to lee side of vessel, secure painter. Abandon ship to liferaft 2. Bunk 5 Muster point 3. Fish Room Hatch Don lifejacket await further orders. Under mates direction. Abandon ship to liferaft 1. Bunk 6 Muster point 3. Fish Room Hatch Don lifejacket await further orders. Under mates direction. Abandon ship to liferaft 2. Additional Crew Muster point 2. Fish Room Hatch Don lifejacket await further orders. Under mates direction. Abandon ship to liferafts as directed by the mate.
Annex C Annual self-certification declaration form
Annex D Guard Vessel Inspection and Specification Document
APPENDIX B GUARD VESSEL INSPECTION AND SPECIFICATION DOCUMENT Vessel Name: Reg No: Client/Project: Audit Time & Date: Inspector: Port of Inspection: No. Yes No Remarks 1 Vessel Spec. (see attached) completed 2 FFSC Guard Vessel Operational Procedures Manual on board 3 Guard Vessel Contract and Project Papers on board 4 Company Policy on Substance Abuse - (Flyer on display) 5 Vessel Certification Issue Date Expiry Date Remarks Load Line Exemption Certificate of Registry Fishing Vessel Certificate Radio Licence Certificate Stability Book Guardship Stability Risk Assessment Folder Last reviewed: 6 Crew Certification Name Rank D.O.B. Marine Cert. Marine Cert. First Aid Fire Fighting S.Awareness Sea Survival Medically Fit Name Rank D.O.B. Marine Cert. Marine Cert. First Aid Fire Fighting S.Awareness Sea Survival Medically Fit Name Rank D.O.B. Marine Cert. Marine Cert. First Aid Fire Fighting S.Awareness Sea Survival Medically Fit Revision: 2.0 Page 1 of 6 Jan 2013
APPENDIX B GUARD VESSEL INSPECTION AND SPECIFICATION DOCUMENT 7 Safety Items Quantity Expiry/Service Date Remarks Liferafts (Make)* HRUs for Liferafts (Makes)* Life Buoys and Smoke Marker EPIRB HRU for EPIRB (Make)* Pyrotechnics (plus Solas Chart No.1) Line Throwers Immersion / Survival Suits* Lifejackets Fire Extinguishers Fire Blanket in Galley Fire Pump and Hoses Bilge Pump Bilge Alarm(s) Tested: Fixed Fire Fighting System Type: Compass (Date last corrected - Devation Card) Medical Kit (Pharmacy Receipt Date + Class) * Category: Navigation Lights and Sound Signals Checked/tested: Waterproof Torch VHF radio (fixed and hand held) Safety Drills (date last undertaken)
- - Servicing Receipt Required
8 Miscellaneous Yes No Remarks Publications/Charts (appropriate electronic and paper charts) Almanac KIS UKCS (current update) FIshSAFE (current update) Binoculars Camera Search Light (hand held - properly charged) MARPOL Regulations (knowledge of) 9 General Condition of Vessel Remarks/Observations/Recommendations Hull Decks Engine Room/Machinery Space/Steering Compartment Galley Accommodation 10 Questions for Fishing Vessels undertaking Guard Duty When did the vessel last have a MCA inspection and what were the findings? Have there been any recent MCA spot checks – what were the findings? What action was taken on the non conformities? Answer: When was the last critical maintenance performed on critical equipment such as main engines/generators? Answer: When was the vessel last slipped/major maintenance carried out? Answer: Lights Expiry Date. Revision: 2.0 Page 2 of 6 Jan 2013
APPENDIX B GUARD VESSEL INSPECTION AND SPECIFICATION DOCUMENT 10 Questions for Fishing Vessels undertaking Guard Duty (continued) Has the vessel a closed shelter deck? If so what arrangements for removal of entrapped water are there? Answer: What is required to maintain watertight integrity of the vessel? Are all escape hatches, watertight doors, deadlights, scuppers etc in good working condition and properly tested? Answer: What are the competencies onboard? Please insert appropriate number(s) in boxes below. Is there a dedicated engineer? Answer: Class 1 Fishing Class 2 Fishing Eng Officer 5 Day Bridge Watch Keeping Eng Watch Navigation/other Watch Keeping Dedicated Engineer - answer yes or no. What is the safety regime onboard? Does the crew wear Personal Floatation Devices (PFD) and appropriate PPE at all times on deck? Answer: What is the Vessel’s weather operating criteria for remaining on guard station? Answer: Has Skipper noted the 'Guardship Stability - Notice to Skipper' information contained within the Vessel's Guardship Stability Booklet and can he confirm that vessel will be loaded as per the noted conditions? If there is any alteration to the noted conditions, the Skipper must confirm that he is aware of the effect that any devation will have to the Vessel's stability. Answer: What is the watch keeping regime offshore? In particular – who mans the bridge, what hours are worked and what competencies are taking a bridge watch? Answer: What accidents/incidents/breakdowns have occurred in last 12 months and if any and if appropriate, what corrective / future preventative action was taken? Answer: Regular Skipper/ Mate or Engineer on board? Please answer yes/no in appropriate boxes below. Answer: Regular Skipper Regular Mate Regular Engineer Are any of the crew going on the guard trip on prescribed medication? If so, (a) Is the Crew member / Skipper aware of the effect that this medication may have on Watch Keeping / other Guard Vessel related duties and, (b) Has the individual an adequate supply of this medication for the scheduled duration of the guard trip? Answer(s): Revision: 2.0 Page 3 of 6 Jan 2013
Vessel Specification: Vessel Details: Name Fishing Vessel Number Date Built Date of any Major Modifications Hull Length Breadth Depth Load Line Exemption Certificate Valid until UKFV Certificate Valid until Tonnage (Gross & Net) Main Engine Type and hp/kw Auxiliary Engine Type and hp/kw Cruising Speed Fuel Oil Capacity Freshwater Capacity Lube Oil Capacity Hydraulic Oil Capacity Maximum Number of days on Location Call Sign Mobile No. Telex No./Email Satellite Phone No. Skipper Owner Accommodation (no. of persons & berthing arrangements) Electronics Navigation (Type) Communications (Type) Radar (1) - Main Radio (1) - Radar (2) - Main Radio (2) - Plotter (1) - VHF (1) - Plotter (2) - VHF (2) - DGPS - Mobile Tel - Echo Sounder - Sat Tel - FishSAFE - Telex/Email - AIS - Navtex - Additional Comments: GUARD VESSEL INSPECTION AND SPECIFICATION DOCUMENT APPENDIX B Revision: 2.0 Page 4 of 6 Jan 2013
Photographs: APPENDIX B GUARD VESSEL INSPECTION AND SPECIFICATION DOCUMENT Revision: 2.0 Page 5 of 6 Jan 2013
Vessel Name: Reg No: Client Project: Audit Time and Date: Inspector: Port of Inspection: No. Close Out Category Date Close Out Category Definitions P = Prior to sailing 1 = Within 1 month window 3 = Within 3 month window I declare that the answers provided in relation to the Questions contained in Section 10 of the Guard Vessel Inspection and Specification document are full and accurate and hereby accept the above findings from today's Guard Vessel Inspection. Project Specific Brief provided by SFF Services Representative - Yes/No (delete as applicable). Skipper's Signature: Skipper's Name: Inspector's Name: Inspector's Name: Checked by - Signature: Checked by - Name: Findings Close Out Action APPENDIX B GUARD VESSEL INSPECTION AND SPECIFICATION DOCUMENT Revision: 2.0 Page 6 of 6 Jan 2013
Annex E Aquarius documented man overboard recovery procedure
Annex F Aquarius log book - Muster and training records
Annex G Risk Assessment - General Working on Deck
Annex H Aquarius LOLER record of inspections
Annex I MAIB Safety Flyer
SAFETY FLYER TO THE FISHING INDUSTRY Aquarius: Fatal man overboard on 17 August 2015 Narrative In the early hours of the morning on 17 August 2015, a fisherman on board the 20.8m twin rig trawler Aquarius (Figure 1) was thrown overboard violently when a rope stopper parted. The vessel had just cleared the port of Aberdeen, Scotland, and its crew were attempting to re-mark the trawl warps when the accident happened. The skipper reacted quickly to stop the vessel, and the crew threw lifebuoys to the casualty. However, the recovery attempt was unsuccessful and, about 10 minutes later, the casualty sank out of view. The skipper then raised the alarm but, despite a search involving numerous vessels and a helicopter, the casualty’s body was not recovered. In order to mark the steel wire warp, the crew had streamed it over the stern. The stopper was used to take the strain of the trailing warp so that the crew could lower its inboard section on to the deck (Figure 2). The MAIB investigation established that: • The stopper parted under tension because a man-made fibre rope had been used instead of a chain, and a proper stopper hitch had not been applied. • The casualty was thrown overboard because he had positioned himself within the bight of the slackened trawl warp. Figure 1 Figure 2
• The method used to mark the trawl warp was unnecessarily hazardous and the outcome was entirely foreseeable. • The crew were unable to recover the casualty back on board because neither they, nor their vessel had been adequately prepared to deal with such emergency situations. ◦◦ The vessel did not carry a dedicated means of recovering a person from the water. ◦◦ The crew did not conduct periodic emergency drills. • The casualty sank and his body was not recovered because he was not wearing a lifejacket or other type of personal flotation device while working on the vessel’s open deck. • Aquarius had been poorly operated; its safety equipment was not properly maintained, hazardous activities had not been risk assessed and its crew worked prolonged hours and did not receive the minimum amount of rest or leave required by UK legislation. Safety Lessons The importance of developing and promoting a strong safety culture within an inherently hazardous industry and ensuring that a vessel and its crew are properly prepared to deal with emergency situations is repeatedly highlighted by MAIB in fishing vessel accident reports. Neither of these safety critical factors was evident on board Aquarius; the key lessons to take from this accident are: • Fishing vessel owners and skippers must make every effort to promote a strong safety culture on board their vessels; hazardous activities should be properly planned and safe systems of work developed. This is particularly important when carrying out non-standard or one-off tasks. • Crew should always wear lifejackets or personal flotation devices when working on deck, especially when working on fishing gear that is to be towed, shot or recovered. • The dangers of standing in the bight of a rope, or over a slacked warp should be well understood by all seafarers and, in accordance with basic seamanship good practice, must be avoided at all times. • Whenever a person falls or is thrown overboard, the alarm should be raised immediately, preferably by use of the vessel’s VHF radio digital selective calling function. This will ensure the speediest response from the emergency services and other vessels operating in the area. • The importance of conducting regular manoverboard recovery cannot be emphasised enough; emergency drills will help ensure that the vessel’s safety equipment remains fully operational, is suitable for its intended use and that the crew are familiar with its use. • Tiredness is a major hazard to all fishermen, and in order to reduce the risk of crew fatigue skippers must ensure that they monitor and record hours of rest. This flyer and the MAIB’s investigation report are posted on our website: www.gov.uk/maib For all enquiries: Marine Accident Investigation Branch Email: maib@dft.gsi.gov.uk First Floor, Spring Place 105 Commercial Road Tel: 023 8039 5500 Southampton, SO15 1GH
FD06039 | 2011_英国_MAIB_gas-explosions-on-general-cargo-ship-nortrader-with-1-person-injured__Nortrader_CombinedAn.pdf
分类:06_境外及港澳台调查报告 | 年份:2011 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
Annex A IMSBC Code - schedule entry for aluminium smelting/remelting by-products
PRECAUTIONS Prior to loading this cargo, a certificate shall be provided by the manufacturer or shipper stating that, after manufacture, the material was stored under cover, but exposed to the weather in the particle size to be shipped, for not less than 3 days prior to shipment. Whilst the ship is alongside and the hatches of the cargo spaces containing this cargo are closed, the mechanical ventilation shall be operated continuously as weather permits. During handling of this cargo, “NO SMOKING” signs shall be posted on decks and in areas adjacent to cargo spaces and no naked lights shall be permitted in these areas. At least two self-contained breathing apparatus, in addition to those required by SOLAS regulation II-2/10.10, shall be provided on board. Bulkheads between the cargo spaces and the engine- room shall be gastight. Inadvertent pumping through machinery spaces shall be avoided. VENTILATION Continuous mechanical ventilation shall be conducted during the voyage for the cargo spaces carrying this cargo. If maintaining ventilation endangers the ship or the cargo, it may be interrupted unless there is a risk of explosion or other danger due to interruption of the ventilation. In any case mechanical ventilation shall be maintained for a reasonable period prior to discharge. Ventilation shall be arranged such that any escaping gases are minimized from reaching living quarters on or under the deck. CARRIAGE For quantitative measurements of hydrogen, ammonia and acetylene, suitable detectors for each gas or combination of gases shall be on board while this cargo is carried. The detectors shall be of certified safe type for use in explosive atmosphere. The concentrations of these gases in the cargo spaces carrying this cargo shall be measured regularly, during voyage, and the results of the measurements shall be recorded and kept on board. DISCHARGE No special requirements. CLEAN-UP Water shall not be used for cleaning of the cargo space which has contained this cargo, because of danger of gas.
EMERGENCY PROCEDURES SPECIAL EMERGENCY EQUIPMENT TO BE CARRIED Nil EMERGENCY PROCEDURES Nil EMERGENCY ACTION IN THE EVENT OF FIRE Batten down and use CO2 if available. Do not use water. If this proves ineffective, endeavour to stop fire from spreading and head for the nearest suitable port. MEDICAL FIRST AID Refer to the Medical First Aid Guide (MFAG), as amended.
Annex B IMSBC Code - 16 point cargo information list and cargo declaration form
Section 4 Assessment of acceptability of consignments for safe shipment 4.1 Identification and classification 4.1.1 Each solid bulk cargo in this Code has been assigned a Bulk Cargo Shipping Name (BCSN). When a solid bulk cargo is carried by sea it shall be identified in the transport documentation by the BCSN. The BCSN shall be supplemented with the United Nations (UN) number when the cargo is dangerous goods. 4.1.2 If waste cargoes are being transported for disposal, or for processing for disposal, the name of the cargoes shall be preceded by the word “WASTE”. 4.1.3 Correct identification of a solid bulk cargo facilitates identification of the conditions necessary to safely carry the cargo and the emergency procedures, if applicable. 4.1.4 Solid bulk cargoes shall be classified, where appropriate, in accordance with the UN Manual of Tests and Criteria, part III. The various properties of a solid bulk cargo required by this Code shall be determined, as appropriate to that cargo, in accordance with the test procedures approved by a competent authority in the country of origin, when such test procedures exist. In the absence of such test procedures, those properties of a solid bulk cargo shall be determined, as appropriate to that cargo, in accordance with the test procedures prescribed in appendix 2 to this Code. 4.2 Provision of information 4.2.1 The shipper shall provide the master or his representative with appropriate information on the cargo sufficiently in advance of loading to enable the precautions which may be necessary for proper stowage and safe carriage of the cargo to be put into effect. 4.2.2 Cargo information shall be confirmed in writing and by appropriate shipping documents prior to loading. The cargo information shall include: .1 the BCSN when the cargo is listed in this Code. Secondary names may be used in addition to the BCSN; .2 the cargo group (A and B, A, B or C); .3 the IMO Class of the cargo, if applicable; .4 the UN number preceded by letters UN for the cargo, if applicable; .5 the total quantity of the cargo offered; .6 the stowage factor; .7 the need for trimming and the trimming procedures, as necessary;
.8 the likelihood of shifting, including angle of repose, if applicable; .9 additional information in the form of a certificate on the moisture content of the cargo and its transportable moisture limit in the case of a concentrate or other cargo which may liquefy; .10 likelihood of formation of a wet base (see subsection 7.2.3 of this Code); .11 toxic or flammable gases which may be generated by cargo, if applicable; .12 flammability, toxicity, corrosiveness and propensity to oxygen depletion of the cargo, if applicable; .13 self-heating properties of the cargo, and the need for trimming, if applicable; .14 properties on emission of flammable gases in contact with water, if applicable; .15 radioactive properties, if applicable; and .16 any other information required by national authorities. 4.2.3 Information provided by the shipper shall be accompanied by a declaration. An example of a cargo declaration form is set out in the next page. Another form may be used for cargo declaration. As an aid to paper documentation, Electronic Data Processing (EDP) or Electronic Data Interchange (EDI) techniques may be used.
FORM FOR CARGO INFORMATION for Solid Bulk Cargoes BCSN Shipper Transport document number Consignee Carrier Name/means of transport Port/place of departure Port/place of destination Instructions or other matters General description of the cargo (Type of material/particle size) Gross mass (kg/tonnes) Specifications of bulk cargo, if applicable: Stowage factor: Angle of repose, if applicable: Trimming procedures: Chemical properties if potential hazard*:
- e.g., Class & UN No. or “MHB”
Transportable Moisture Limit Group of the cargo Group A and B* Group A* Group B Group C * For cargoes which may liquefy (Group A and Group A and B cargoes) Moisture content at shipment Relevant special properties of the cargo (e.g., highly soluble in water) Additional certificate(s)* Certificate of moisture content and transportable moisture limit Weathering certificate Exemption certificate Other (specify)
- If required
DECLARATION I hereby declare that the consignment is fully and accurately described and that the given test results and other specifications are correct to the best of my knowledge and belief and can be considered as representative for the cargo to be loaded. Name/status, company/organization of signatory Place and date Signature on behalf of shipper
Annex C Carrying solid bulk cargoes safely - booklet
Carrying solid bulk cargoes safely Guidance for crews on the International Maritime Solid Bulk Cargoes Code In conjunction with
Carrying solid bulk cargoes safely © Lloyd’s Register/UK P&I Club/Intercargo, 2013 Page 2 Contents Introduction
- General requirements for carrying solid bulk cargoes
Accepting cargoes for shipment Loading
- The Code’s three cargo groups
Group A cargoes – cargoes which may liquefy Group B cargoes – cargoes with chemical hazards Group C cargoes – cargoes which are neither liable to
liquefy nor possess chemical hazards
- Other hazards associated with carrying solid bulk cargoes
- Checklist and flowchart for accepting and loading solid
bulk cargoes Appendix 1 IMO regulations and guidance relating to the transport of solid bulk cargoes Appendix 2 The Code section by section 3 4 4 6 7 8 10 14 15 16 19 21
Introduction Carrying solid bulk cargoes involves serious risks, which must be managed carefully to safeguard the crew and the ship. These risks include reduced ship stability, and even capsizing, due to cargo liquefaction; fire or explosion due to chemical hazards; and damage to ship structures due to poor loading procedures. The main legislation governing safe carriage of solid bulk cargoes is the International Maritime Solid Bulk Cargoes (IMSBC) Code, which became mandatory on January 1, 2011, under the SOLAS Convention . This pocket guide will help you understand the IMSBC Code’s key requirements and give you greater confidence in managing the risks of carrying solid bulk cargoes and achieving compliance with SOLAS. It outlines the precautions you should take before accepting cargoes for shipment and the procedures you should follow for safe loading and carriage, and details the primary hazards associated with the different types of solid bulk cargo. It also contains a quick reference checklist and flowchart summarising the steps you need to follow. Note: This guide is only an introduction to the IMSBC Code; you should always consult the full Code to check the requirements for each cargo you are carrying. It does not cover carriage of grain in bulk; this is covered by the International Grain Code. Look for “Consult the Code” headings within this publication, which refer you to specific sections of the Code for more information. Carrying solid bulk cargoes safely © Lloyd’s Register/UK P&I Club/Intercargo, 2013 Page 3 Note: This guide is only an introduction to the IMSBC Code; you should always consult the full Code to check the requirements for each cargo you are carrying. It does not cover carriage of grain in bulk; this is covered by the International Grain Code. Look for “Consult the Code” headings within this publication, which refer you to specific sections of the Code for more information. Introduction Carrying solid bulk cargoes involves serious risks, which must be managed carefully to safeguard the crew and the ship. These risks include reduced ship stability (and even capsizing) due to cargo liquefaction; fire or explosion due to chemical hazards; and damage to ship structures due to poor loading procedures. The main legislation governing safe carriage of solid bulk cargoes is the International Maritime Solid Bulk Cargoes (IMSBC) Code, which became mandatory on January 1, 2011, under the SOLAS Convention1. This pocket guide will help you understand the IMSBC Code’s key requirements and give you greater confidence in managing the risks associated with the carriage of solid bulk cargoes. It outlines the precautions you should take before accepting cargoes for shipment and the procedures you should follow for safe loading and carriage, and details the primary hazards associated with the different types of solid bulk cargo. It also contains a quick reference checklist and flowchart summarising the steps you need to follow. 1For a list of other IMO legislation and guidance relating to bulk cargoes, see Appendix 1.
Carrying solid bulk cargoes safely © Lloyd’s Register/UK P&I Club/Intercargo, 2013 Page 4
- General requirements for
carrying solid bulk cargoes No matter what solid bulk cargo you are carrying, the same general requirements apply for accepting them for shipment and loading them. Section 2 of this pocket guide covers the typical requirements for different types of cargo. Accepting cargoes for shipment Information required from the shipper Before you can accept a cargo for shipment, the shipper must provide the Master with valid, up-to-date information about the cargo’s physical and chemical properties. The exact information and documentation they must provide is listed in the Code under ‘Assessment of acceptability of consignments for safe shipment; Provision of Information’, and includes the correct Bulk Cargo Shipping Name2 and a declaration that the cargo information is correct.
Checking the cargo schedule Individual cargoes are listed in ‘schedules’ which are contained in Appendix 1 of the Code. These describe each cargo’s properties and detail the requirements for handling, stowing and carrying it safely. You must always consult the relevant schedule in the Code to find out what hazards the cargo presents. 2This is the cargo’s official name used in the Code. Cargo being worked Consult the Code – see Section 4 Consult the Code – see Appendix 1
Carrying solid bulk cargoes safely © Lloyd’s Register/UK P&I Club/Intercargo, 2013 Page 5 Accepting cargoes not listed in the IMSBC Code The list of individual cargoes contained in the Code is not exhaustive. If a cargo not listed in the Code is presented for shipment, the shipper and the appropriate competent authorities3 must follow this process:
- Before loading, the shipper must provide details of the characteristics and
properties of the cargo to the competent authority of the port of loading.
- Based on this information the competent authority of the port of loading
will assess the acceptability of the cargo for shipment.
– If the assessment defines the cargo as Group A or B4, the competent
authorities3 will set the preliminary suitable conditions for carriage.
– If the cargo is Group C4 then carriage can be authorised by the port of
loading and the competent authorities of the unloading port and flag
state will be informed of the authorisation.
- In both cases, the competent authority of the port of loading will give the
Master a certificate stating the characteristics of the cargo and the required
conditions for carriage and handling. The competent authority of the port of
loading will also provide the same information to the IMO.
Exemptions Under section 1.5 of the Code, a competent authority (or authorities) can grant an exemption which allows ships to carry a cargo outside the requirements specified in its schedule, provided that equivalent provisions have been put in place. Agreement of all three competent authorities is required to ship a cargo under an exemption. Acceptance of an exemption by authorities not party to it is discretionary: i.e., if the loading port authority issues an exemption, the unloading port and flag state authorities can choose to accept it or reject it. An exemption can be valid for up to five years and does not necessarily lead to the creation of a new or revised schedule. 3The competent authorities of the port of loading, the port of unloading and the flag state. 4The Code categorises cargo into three Groups – A, B and C. See page 7 for their definitions. Consult the Code – see Section 1.3 Consult the Code – see Section 1.5
Carrying solid bulk cargoes safely © Lloyd’s Register/UK P&I Club/Intercargo, 2013 Page 6 Loading Inspecting and preparing cargo spaces In general, before loading a cargo you must inspect and prepare the cargo spaces, checking that: – bilge wells and strainer plates are prepared to facilitate drainage and prevent cargo entering the bilge system – bilge lines, sounding pipes and other service lines are in good order – cargo space fittings are protected from damage, and – measures are in place to minimise dust entering living quarters or other
interior spaces, or coming into contact with moving parts of deck machinery and external navigational aids. Distribution and stability You must also make sure that cargoes are properly distributed throughout the ship’s holds to provide adequate stability and ensure that the ship’s structure is never overstressed. Information can be found in the ship’s stability information booklet or you can use loading calculators if they are available. The Master will need to calculate the stability for the anticipated worst conditions during the voyage as well as for departure and demonstrate that the stability is adequate.
Loading Plan Before loading or unloading, the Master and the terminal representative must agree a Loading Plan to ensure that the permissible forces and moments on the ship are not exceeded. What this Plan should include is detailed in the Code of Practice for the Safe Loading and Unloading of Bulk Carriers (the BLU Code) and in the checklist on page 16.
Carrying solid bulk cargoes safely © Lloyd’s Register/UK P&I Club/Intercargo, 2013 Page 7
- The Code’s three cargo groups
The IMSBC Code categorises cargoes into three groups: Group A – cargoes which may liquefy if shipped at a moisture content exceeding their Transportable Moisture Limit (TML)5. Group B – cargoes which possess a chemical hazard which could give rise to a dangerous situation on a ship. Group C – cargoes which are neither liable to liquefy (Group A) nor possess chemical hazards (Group B). Cargoes in this group can still be hazardous. You can find the Group for a particular cargo in its schedule. *GOSCjCBLGAICJMPC'K?ECAMSPRCQWMD+2"
5The TML is the maximum moisture content considered safe for carriage. See page 9.
Carrying solid bulk cargoes safely © Lloyd’s Register/UK P&I Club/Intercargo, 2013 Page 8 Group A cargoes (cargoes which may liquefy) What is liquefaction and how does it affect cargo? Liquefaction means that a cargo becomes fluid (liquefies). On ships, this happens when the cargo is compacted by the ship’s motion. Cargoes which are prone to liquefaction contain a certain quantity of moisture and small particles, although they may look relatively dry and granular when loaded. Liquefaction can lead to cargo shift6 and even to the capsize and total loss of the ship, and can occur even when cargoes are cohesive and trimmed level. Examples of Group A cargoes Mineral concentrates Mineral concentrates are refined ores in which valuable components have been enriched by eliminating most waste materials. They include copper concentrate, iron concentrate, lead concentrate, nickel concentrate and zinc concentrate. Nickel ore7 There are several types of nickel ore which vary in colour, particle size and moisture content. Some may contain clay-like ores. Coal Coal (bituminous and anthracite) is a natural, solid, combustible material consisting of amorphous carbon and hydrocarbons. It is best known as a Group B cargo due to its flammable and self- heating properties, but it can also be classed as Group A because it can liquefy if predominantly fine (i.e., if 75% is made up of particles less than 5mm in size). In these cases, it is classed as both Group A and B. 6Cargo shift can be divided into two types: sliding failure or liquefaction consequence. Trimming the cargo can prevent sliding failure. 7Nickel ore is not to be confused with nickel concentrate. Coal being loaded. Coal is most AMKKMLJW?%PMSN A?PEM @SR can also be classed as both A and B. Consult the Code – see Section 7
Carrying solid bulk cargoes safely © Lloyd’s Register/UK P&I Club/Intercargo, 2013 Page 9
Hui Long ?@SJIA?PPGCPUFGAF Q?LIGL2FCA?SQCU?Q @CJGCTCBRM@CJGOSCD?ARGML
NMQQG@JWBSCRMRFC2+* being exceeded. Typical requirements for accepting and loading Group A cargoes Information required from the shipper To control the risks of liquefaction, Group A cargoes are tested to determine their Transportable Moisture Limit (TML) and their actual moisture content before they can be shipped. The TML is the maximum moisture content considered safe for carriage. The actual moisture content of the cargo must be below the TML. The information supplied by the shipper to the master must include a signed certificate stating the TML, and a signed certificate or declaration of the cargo’s actual moisture content. What you need to do Follow these steps when carrying Group A cargoes to reduce the risk of liquefaction: – Make sure the shipper has supplied the required information, including the TML and the actual moisture content. – Only accept the cargo if the actual moisture content is less than its TML. – Carry out visual monitoring during loading. If there are any indications of high moisture content, stop loading and seek further advice. – Consider trimming the cargo to reduce the likelihood of cargo shift. – Take measures to prevent water or other liquids entering the cargo space during loading and throughout the voyage. Practical guidance on managing the risks of liquefaction is also available from the UK P&I Club at www.ukpandi.com/loss-prevention Consult the Code – see Sections 7 and 8
Carrying solid bulk cargoes safely © Lloyd’s Register/UK P&I Club/Intercargo, 2013 Page 10 Group B cargoes (cargoes with chemical hazards) Group B cargoes are classified in two ways within the Code: ‘Dangerous goods in solid form in bulk’ (under the International Maritime Dangerous Goods (IMDG) Code; and ‘Materials hazardous only in bulk’ (MHB). You will find this information in the “characteristics” section of the cargo’s schedule. Cargoes classified as dangerous goods in solid form in bulk will also have a ‘UN’ number in the Bulk Cargoes Shipping Name.
Dangerous goods in solid form in bulk In the Code these cargoes are classed as follows: Class 4.1: Flammable solids Class 4.2: Substances liable to spontaneous combustion Class 4.3: Substances which, in contact with water, emit flammable gases Class 5.1: Oxidizing substances Class 6.1: Toxic substances Class 7: Radioactive materials Class 8: Corrosive substances Class 9: Miscellaneous dangerous substances and articles. Materials hazardous only in bulk (MHB) MHB cargoes are materials which possess chemical hazards when transported in bulk that do not meet the criteria for inclusion in the IMDG classes above. They present significant risks when carried in bulk and require special precautions. They are described as follows: Combustible solids: materials which are readily combustible or easily ignitable Self-heating solids: materials that self-heat Solids that evolve into flammable gas when wet: materials that emit flammable gases when in contact with water Solids that evolve toxic gas when wet: materials that emit toxic gases when in contact with water Toxic solids: materials that are acutely toxic to humans if inhaled or brought into contact with skin Corrosive solids: materials that are corrosive to skin, eyes, metals or respiratory sensitisers. Consult the Code – see Section 9
Carrying solid bulk cargoes safely © Lloyd’s Register/UK P&I Club/Intercargo, 2013 Page 11 Examples of Group B cargoes and the risks they present The major risks associated with Group B cargoes are fire and explosion, release of toxic gas and corrosion.
Coal Coal may create flammable atmospheres, heat spontaneously, deplete oxygen concentration and corrode metal structures. Some types of coal can produce carbon monoxide or methane. Direct reduced iron (DRI) DRI may react with water and air to produce hydrogen and heat. The heat produced may cause ignition. Oxygen in enclosed spaces may also be depleted. Metal sulphide concentrates Some sulphide concentrates are prone to oxidation and may have a tendency to self-heat, leading to oxygen depletion and emission of toxic fumes. Some metal sulphide concentrates may present corrosion problems. Organic materials Ammonium nitrate-based fertilisers Ammonium nitrate-based fertilisers support combustion. If heated, contaminated or closely confined, they can explode or decompose to release toxic fumes and gases. Wood products transported in bulk8 Wood products transported in bulk are listed in a new schedule to the Code: Wood Products – General. They include logs, pulpwood, roundwood, saw logs and timber. These cargoes may cause oxygen depletion and increase carbon dioxide in the cargo space and adjacent spaces.
2FCB?K?ECA?SQCB@W?"0'CVNJMQGML 'K?ECAMSPRCQWMD SPEMWLCQ 8These are wood products loaded and discharged by methods such as elevators and grabs. They are distinct from wood products listed in other schedules.
Carrying solid bulk cargoes safely © Lloyd’s Register/UK P&I Club/Intercargo, 2013 Page 12 Typical requirements for accepting and loading Group B cargoes Information required on board ship for dangerous goods in solid form in bulk To carry dangerous goods in solid form in bulk, your ship must have a Document of Compliance for the Carriage of Dangerous Goods, supplied by the ship’s flag or classification society. The Master must have a special list, manifest or stowage plan identifying the cargo’s location, and there must be instructions on board for emergency response. Segregation Because of their potential hazards, many Group B cargoes are incompatible and must be segregated. When segregating cargoes, you should take into account any secondary risks they present.
!M?JMLjPCGL?A?PEMFMJB Consult the Code – see Section 9.3
Carrying solid bulk cargoes safely © Lloyd’s Register/UK P&I Club/Intercargo, 2013 Page 13 Specific risk mitigation measures The cargo’s schedule and the information provided by the shipper will detail the precautions you must take when carrying Group B cargoes. The following are some of the common risk mitigation measures you will employ. Fire and explosion Depending on the cargo, precautions against fire and explosion may include ventilating or inerting the cargo holds and the enclosed spaces adjacent to the holds: in some cases the ventilators will need to be explosion proof. The atmosphere in the cargo holds and the enclosed spaces adjacent to the holds may also need to be monitored with an appropriate gas detector. Toxic gas Toxic gas risks will be mitigated using natural or forced mechanical ventilation. The choice of ventilation will depend on the type of cargo and the properties of the gas (i.e., whether it creates an explosive atmosphere). You may need to monitor the cargo hold atmosphere. Corrosion Corrosion can be caused by some Group B cargoes and their residues. A coating or barrier may need to be applied to the cargo space structures before loading. Before loading and unloading corrosive cargoes, make sure the cargo space is clean and dry. "0'UFGAFF?QQCJDFC?RCB'K?ECAMSPRCQWMD SPEMWLCQ
Carrying solid bulk cargoes safely © Lloyd’s Register/UK P&I Club/Intercargo, 2013 Page 14 Group C cargoes (cargoes which are neither liable to liquefy nor possess chemical hazards) Although Group C cargoes do not present the dangers associated with Group A and B cargoes, they can still carry risks. Examples of Group C cargoes, their risks and mitigation measures Iron ore and high density cargoes These cargoes can be extremely dense and can overstress the tanktop. Make sure that their weight is evenly distributed during loading and during the voyage so that the tanktop is not overstressed, and also consider trimming the cargo. Loading rates of iron ore are normally very high and you should also consider the ship’s ballasting operations and loading sequences. Sand and fine particle materials Fine particle materials can be abrasive. Silica dust is easily inhaled and can result in respiratory disease. You should take appropriate precautions to protect machinery and accommodation spaces from the dust of sand and fine particle cargoes, and to prevent the cargo from getting into the bilge wells. People who may be exposed to cargo dust should wear goggles or other equivalent dust eye-protection, dust filter masks and protective clothing. Cement Cement may shift when aerated during loading. Dust can also be produced from this cargo. Follow the precautions for sand and fine particle materials (above).
Carrying solid bulk cargoes safely © Lloyd’s Register/UK P&I Club/Intercargo, 2013 Page 15
- Other hazards associated with carrying
solid bulk cargoes Entering enclosed spaces Always follow the appropriate procedures before entering an enclosed space, taking into account IMO Resolution A.1050(27) – Revised Recommendations for Entering Enclosed Spaces Aboard Ships. Note: after a cargo space or tank has been tested and generally found to be safe for entry, small areas may exist where oxygen is deficient or toxic fumes are still present. Pesticides The risks of using pesticides include the accumulation of gas in spaces adjacent to the cargo holds being treated or, if it is essential to ventilate the cargo holds, accumulation of fumigant in accommodation and working areas. Fumigants such as Phosphine and Methyl Bromide are poisonous to humans and if they are not handled correctly, they can also represent a fire risk. They should only be used by specialists and not by the ship’s crew. Carry out any fumigation in line with the IMO Circular, MSC.1/Circ.1264 – Recommendations on the Safe Use of Pesticides in Ships Applicable to the Fumigation of Cargo Holds. This is contained in the supplement to the Code. The ship should carry gas-detection equipment, adequate respiratory protective equipment, a copy of the latest version of the Medical First Aid Guide for Use in Accidents Involving Dangerous Goods (MFAG), and appropriate medicines and medical equipment.
Carrying solid bulk cargoes safely © Lloyd’s Register/UK P&I Club/Intercargo, 2013 Page 16
- Checklist and flowchart for accepting
and loading solid bulk cargoes The checklist on the next two pages and the loading flowchart on page 18 bring together all the key procedures you must follow when accepting and loading any solid bulk cargo for shipment. Always consult the Code itself to ensure that all mandatory measures and specific advice have been implemented. Download a large version of the flowchart at www.lr.org/imsbc Checklist Before accepting and loading a cargo, ask yourself the following questions:
- Has the shipper delivered the cargo information and documentation listed in
the Code under ‘Assessment of acceptability of consignments for safe shipment; Provision of Information’, including the correct Bulk Cargo Shipping Name (BCSN), and provided a declaration that the cargo information is correct?
- Have you consulted the relevant IMSBC Code schedule to find out the cargo’s
general and specific hazards?
- If the cargo is listed as Group A, have you followed all procedures relating
to the safe carriage of cargoes which may liquefy?
- If the schedule indicates the cargo is Group B has the shipper provided
a statement that the chemical characteristics of the cargo are, to the best of his knowledge, those present at the time of loading?
a) If the cargo is classified as ‘dangerous goods in solid form in bulk’ does the
Master have a special list, manifest or stowage plan identifying its location,
are there instructions on board for emergency response, and does the ship
have a Document of Compliance for the Carriage of Dangerous Goods?
(Continued on the next page)
Carrying solid bulk cargoes safely © Lloyd’s Register/UK P&I Club/Intercargo, 2013 Page 17 Checklist (continued)
- Whatever the cargo Group, have you taken the recommended precautions
to remove or minimise the cargo’s hazard, including:
a) preparing recommended safety equipment and procedures?
b) activating any cargo monitoring equipment ready for loading?
- Have the Master and Terminal Representative agreed a Loading Plan to ensure
that the permissible forces and moments on the ship are not exceeded during loading or unloading? This should include the sequence, quantity and rate of loading or unloading, the number of pours and the de-ballasting or ballasting capability of the ship.
- Are there instructions to suspend the loading or unloading operation if
the ship’s limits are exceeded, or are likely to be exceeded if the operation continues?
- Are you monitoring the cargo loading or unloading procedure, is the ship’s
draught being monitored and recorded in the logbook, and have any significant deviations been corrected?
- Before sailing on the loaded passage, have you considered other factors, such
as the ingress of water, which could affect the cargo during the passage? Carrying solid bulk cargoes safely © Lloyd’s Register/UK P&I Club/Intercargo, 2013 Page 18
Shipper has delivered all required cargo information? IMSBC Code consulted regarding cargo and associated hazards? Master and crew have the necessary ship data and information to prepare ship for loading? Cargo spaces inspected and prepared for cargo loading and stowage? Is the cargo categorised as ‘dangerous goods in solid form in bulk’ by SOLAS regulation VII/7? Does the Master have a special list/manifest/stowage plan identifying its location, are there instructions on board for emergency response, and does the ship have a ‘Document of Compliance for the Carriage of Dangerous Goods’? Has the Loading Plan been agreed with the Master and terminal representative? Are there instructions to suspend the loading/unloading operation if the ship’s limits are exceeded, or are likely to be exceeded if continued? YES YES LOAD (monitoring the cargo loading operation) A B C Not listed in IMSBC Code? NO TML Certificate? Moisture content (MC) declaration? MC lower than TML? Cargo spaces free from liquids? Visual monitoring conducted? Trimming considered? Stowage/segregation acceptable? Atmospheric conditions suitable and monitoring tools operational? Applicable dust precautions in place? Ventilation meets operational and IMSBC requirements? Competent authority has provided the Master with certificate stating carriage requirements (if Group A or B, agreed by authority of port of unloading and flag)? IMSBC Cargo Schedule consulted? Applicable precautions taken? DO NOT LOAD Cargo Group? NO NO NO NO NO NO NO NO Loading flowchart – follow the steps to see if it is safe to load your cargo
Carrying solid bulk cargoes safely © Lloyd’s Register/UK P&I Club/Intercargo, 2013 Page 19 Appendix 1 – IMO regulations and guidance relating to the transport of solid bulk cargoes Mandatory regulations International Convention for the Safety of Life at Sea (SOLAS) – Chapter VI: Carriage of cargoes – Chapter VII: Carriage of dangerous goods – Chapter XII: Additional safety measures for bulk carriers International Maritime Solid Bulk Cargoes (IMSBC) Code – facilitates the safe stowage and shipment of solid bulk cargoes by providing information on the risks associated with their shipment, and the procedures to be adopted for carriage. International Code for the Safe Carriage of Grain in Bulk (International Grain Code) – contains regulations and guidance for ships engaged in the carriage of grain in bulk. Code of Safe Practice for Ships Carrying Timber Deck Cargoes – provides stowage, securing and other operational safety measures designed to ensure the safe transport of timber cargoes, primarily stowed on deck. MARPOL Annex V – Regulations for the Prevention of Pollution by Garbage from Ships – includes requirements for discharge of dry bulk cargo residues and cargo hold wash-water containing cargo residues. Guidance Code of Practice for the Safe Loading and Unloading of Bulk Carriers (BLU Code) – assists those responsible for the safe loading or unloading of bulk carriers to carry out their functions and to promote the safety of bulk carriers. Circulars and Resolutions – MSC.1/Circ.1160 – Manual on Loading and Unloading of Solid Bulk Cargoes for Terminal Representatives. – MSC. 1/Circ.1357 – Additional Considerations for the Safe Loading of Bulk Carriers
Carrying solid bulk cargoes safely © Lloyd’s Register/UK P&I Club/Intercargo, 2013 Page 20 Circulars and Resolutions (continued) – MSC. 1/Circ.908 – Uniform Method of Measurement of the Density of Bulk Cargoes – MSC. 1/Circ.1395 – Lists of Solid Bulk Cargoes for which a Fixed Gas Fire-extinguishing System may be Exempted or for which a Fixed Gas Fire- extinguishing System is Ineffective – Resolution A.1050(27) – Revised Recommendations for Entering Enclosed Spaces Aboard Ships – MSC. 1/Circ.1264 – Recommendations on the Safe Use of Pesticides in Ships Applicable to the Fumigation of Cargo Holds – BC. 1/Circ.69 – Contact Names and Addresses of the Offices of Designated National Competent Authorities Responsible for the Safe Carriage of Grain and Solid Bulk Cargoes.
Carrying solid bulk cargoes safely © Lloyd’s Register/UK P&I Club/Intercargo, 2013 Page 21 Appendix 2 – the Code section by section Section 1 – General provisions – including application, definitions, related SOLAS regulations Section 2 – General loading, carriage and unloading precautions – cargo
distribution and loading/unloading procedures Section 3 – Safety of personnel and ship - poisoning, corrosive and asphyxiation hazards, dust hazards, flammability and ventilation Section 4 – Assessment of acceptability of consignments for safe shipment – identification of cargoes, and the tests and documentation required for their safe carriage Section 5 – Trimming procedures Section 6 – Methods of determining angle of repose Section 7 – Cargoes that may liquefy – the dangers of liquefaction, conditions under which liquefaction may take place and precautions to prevent it Section 8 – Test procedures for cargoes that may liquefy Section 9 – Materials possessing chemical hazards – classification of hazards, stowage and segregation requirements Section 10 – Carriage of solid bulk wastes – their classification, segregation and stowage Section 11 – Security provisions Section 12 – Stowage factor conversion tables Section 13 – References to related information and recommendations Appendices Appendix 1 – Individual schedules of solid bulk cargoes Appendix 2 – Laboratory test procedures, associated apparatus and standards Appendix 3 – Properties of solid bulk cargoes Appendix 4 – Index of solid bulk cargoes Supplement – this contains supporting documents including the BLU Code and IMO circulars (see Appendix 1)
Lloyd’s Register is an independent risk management organisation that works to improve its clients’ quality, safety, environmental and business performance throughout the world. Our expertise and activities cover shipping, railways, other land-based industries and oil and gas. Working from around 245 locations we employ some 7,600 personnel. We operate independently of any government or other body. Lloyd’s Register is a trading name of Lloyd’s Register Group Limited and its subsidiaries. For further details please see www.lr.org/entities To order additional copies of this pocket guide, please visit the Lloyd’s Register webstore: www.webstore.lr.org About the UK P&I Club One of the world’s largest P&I mutuals, the UK P&I Club currently insures around 200 million gross tons of owned and chartered ships in 60 countries. The Club publishes loss prevention material through a wide range of media on topics such as hazardous cargo in containers, human error, personal injury and maritime security. The full range of Club activities can be viewed at www.ukpandi.com About Intercargo Intercargo exists in order to present a unified voice for shipowners and operators in the dry bulk sector. Intercargo’s primary objective is to link industry stakeholders in a commitment to a safe, efficient and environmentally friendly dry cargo maritime industry. For further details see www.intercargo.org The full range of Club activities can be viewed at www.ukpandi.com
Annex D Material Safety Data Sheet for U-IBA
MATERIAL SAFETY DATA SHEET According to EU Directive nr. 1907/2006 and nr 1272/2008 en 453/2010 Untreated Incinerator bottom ash
Page: 1 of 6 Produced by: IndusTox Consult (fj)
Version: 1.0 Edition: 23-02-2012
- IDENTIFICATION OF THE MATERIAL
- 1. Identification of the compound
Product name: Untreated incinerator bottom ash Chemical name: A mixture of particles consisting of minerals like calcium carbonate, calcium sulphate, iron oxide en aluminium silicates together with scrab and metal particles like aluminium, lead, zinc and copper Commercial name: Raw IBA CAS nr: Not applicable 1.2. Usage of the material Raw IBA is the untreated IBA which is produced as a residue by incineration of household and commercial waste. Raw bottom ash contains big pieces of bottom ash together with scrap and non ferrous metals mainly aluminium. Also there is a minor piece of unburned material in it. The product is heterogeneous. De raw bottom ash is upgraded by treatment to produce IBA which is a building material which is used in the road construction industry. The treatment consists of separating the scrap, non-ferrous particles and unburned pieces form the mineral pieces which are minimized to a maximum grain size of 40 mm.
- 3. Identification of the producer
Producer: Address: Place: Telephone: Fax: E-mail: Web site:
- 4. Telephone numer in case of Emergency
Producer: Telephone (24 hours a day): National contact: Telephone:
- IDENTIFICATION OF THE RISKS
- 1. Classification of the material
Classification according to EU 1272/2008 No risk classification. This product contains respirable crystalline silica as an impurity. The concentration of respirable quartz is less than 1%. Therefore it is non- hazardous. The Industrial Mineral Producers (IMA) pose that silicoses is the critical effect of inhalation of respirable crystalline silica and that lung cancer is a secondary effect. This product is classified according to the criteria of the Industrial Mineral Producers (IMA). The product contains Pb as an impurity. Lead compounds are harmful to the reproduction. The concentration is less than 0,3 % and therefore the product is not classified as harmful to the reproduction. MATERIAL SAFETY DATA SHEET According to EU Directive nr. 1907/2006 and nr 1272/2008 en 453/2010 Untreated Incinerator bottom ash
Page: 2 of 6 Produced by: IndusTox Consult (fj)
Version: 1.0 Edition: 23-02-2012
EG-classification/EWC Non-hazardous waste with code 19.01.12 according to the European Waste catalogue: bottom ash and slag which are not in the category of bottom ash containing hazardous compounds”.
- 2. Labelling
No risk labelling
- 3. Other risks
None
- SAMENSTELLING / INFORMATIE OVER DE BESTANDDELEN
Name Percentage (v/v) Risks of the constituents Raw AEC-bodemas 100%
Pb-compound 1 - 2 g/kg H360, H332, H302, H373, H410 Zn-compound 3 - 4 g/kg H302, H314, H410 Sum of 6 PCB’s < 175 µg/kg H373, H410 Dioxins (as TEQ) 0,02- 0,05 µg/kg H373, H350 Total-PAH < 30 mg/kg H350, H340, H360, H317, H410 Respirable crystalline silica, under which quartz Max 0,01 % (v/v) H350, H373
- First Aid Arrangements
Rae IBA is rich of chalk and has a pH of 9 - 12 and therefore it is an alkaline product. The following points are addressed to this property 4.1. Ogen Effect: First aid: Possible irritating for the eyes. Red eyes and tears.
Flush with water and when necessary consult a doctor.
- 2. Inhalation
Effect:
First aid: Possible light irritation of the air way, but not to expect.
Fresh air; when necessary consult a doctor.
- 3. Swallowing
Effect:
First aid: Inflamed feeling in the stomach.
Flush mouth, drink water, consult the Urgent Help of the nearest hospital when the complaint last longer than one hour.
MATERIAL SAFETY DATA SHEET According to EU Directive nr. 1907/2006 and nr 1272/2008 en 453/2010 Untreated Incinerator bottom ash
Page: 3 of 6 Produced by: IndusTox Consult (fj)
Version: 1.0 Edition: 23-02-2012
- 4. Skin
Effect:
First aid: Possibly light irritating, red skin.
Wash skin and hands with soap before eating, drinking, toileting and smoking, take of polluted clothes and wash regularly. When skin eruption occurs ask a doctor
- FIRE PREVENTION
Fire prevention by: Suitable quenching aids The material is inflammable. No dangerous situation can be expected in case of fire.
All quenching aids are permitted
- MEASUREMENTS WHEN DUST IS RELEASED ACCIDENATALY
- 1. Personal precaution
Direct contact with the skin is not advisable. Wear complete covering working clothes, use working gloves and wear safety goggles and breath protection FFP3.
- 2. Environment precaution
Keep windows and doors of building and vehicles closed when possible. Avoid contact of raw bottom ash with the sewer, surface water or direct contact with the soil.
- 3. Cleaning methods
Avoid flying away of dust and spray after enduring dryness. Spoiled product can be discharged according to the European Waste catalogue (code 19.01.12). Don’t flush the spoiled material into the sewer or into the surface water.
- HANDLING AND STORAGE
- 1. Safe handling
Dust category S5: Hardly sensitive to dust when > 15% of moisture. Can be categorized to higher class when the moisture content is < 15% Prevent forming of dust when handled. Use protection of airways when ventilation is not possible. Don’t eat, drink and smoke on the working place. Wash hands after using. Take of personal protection and working clothes when an eating place is entered.
MATERIAL SAFETY DATA SHEET According to EU Directive nr. 1907/2006 and nr 1272/2008 en 453/2010 Untreated Incinerator bottom ash
Page: 4 of 6 Produced by: IndusTox Consult (fj)
Version: 1.0 Edition: 23-02-2012
- 2. Conditions for save storage
Raw bottom ash has puzzolanic properties whereby the granulate will form a bound mass. When stored in a closed facility ventilate.
- PRECAUTIONS TO CONTROL EXPOSURE / PERSONAL PROTECTION
- 1. Limits for exposure
Technical arrangements: When handling IBA take measurement to prevent dust. Exposure limits Target limit for inhaling: 3,0 mg/m3 als TGG-8 uur.
Personal protection means Inhalation Working when dust: dusk mask with FFP3-filter. Hands Working with contact: Working gloves. Eye Working when dust: Safety goggles. Skin and body In dirt surroundings: Complete covering working clothes
- FYSICALK AND CHEMICAL PROPERTIES
- 1. General information
Fysical form: Solid compound both lumps and dust. Can contain big pieces of metals Smell: Typical light cement smell Colour: Dark grey till black 9.2. Important health, environmental and safety information pH: Between 9 en 12 Density: When deposited ca. 1550 kg/m3 , Densed ca. 1800 kg/m3 Damp density: Not applicable Melting point: Not applicable Flame pint: Inflammable Boiling point: Not applicable Explosive: Non-explosive Solubility in water: Insoluble. A part of the metal compounds and salts can leach.
- STABILITY AND REACTIVITY
- 1. Stability product
Avoid contact with groundwater because compounds which are harmful to the environment can be leached. When stored for a long time the temperature can rise very little because of cementious reactions..
MATERIAL SAFETY DATA SHEET According to EU Directive nr. 1907/2006 and nr 1272/2008 en 453/2010 Untreated Incinerator bottom ash
Page: 5 of 6 Produced by: IndusTox Consult (fj)
Version: 1.0 Edition: 23-02-2012
- 2. Materials to avoid
Not known and not to expect
- 3. Hazardous decomposing compounds
When contacted with water (H2O) possible formation of hydrogen gas (H2-gas). Under reducing circumstanced ammonia can be formed (NH3). Accidentally fosfine (PH3) can escape.
- 4 Reactivity
Not known and not to expect
- TOXICOLOGAL INFORMATION
- 1. Acute toxicity
Lethal dose (LD)50 oral, rat: Not known Direct consequences: When dust enters the eyes it can irritate. When swallow it can irritate the stomach and intestinal tube
- 2. Chronically toxicity
Long term consequences: Not known.
ECOLOGICAL INFORMATION Ecotoxicity: Ecotoxicologal information is not known. It is to be expected that because of pH adjustment there can be effect in aquatic systems
INSTRUCTIONS FOR REMOVING 13.1. Waste/Unused products
Take spoiled material back to the pile or bring it to a certified handler according to the EWC.
- 2. Packing
No special demands
- INFORMATION ABOUT TRANSPORT
UN-number and class: None ADR/ADNR/RID: Not applicable
General: No special precautions needed according to the transport demands for non hazardous goods. Avoid dust formation and spoiling during loading.
MATERIAL SAFETY DATA SHEET According to EU Directive nr. 1907/2006 and nr 1272/2008 en 453/2010 Untreated Incinerator bottom ash
Page: 6 of 6 Produced by: IndusTox Consult (fj)
Version: 1.0 Edition: 23-02-2012
Cover when transported.
OBLIGATORY LEGAL INFORMATION EG classification waste materials: Non-hazardous waste with code 19.01.12 according to the European Waste catalogue: bottom ash and slag which are not in the category of bottom ash containing hazardous compounds”. EG-hazardous classification EG-hazardous classification is not applicable because bottom ash is a waste. According to the classification of the Industrial Mineral Producers Association (IMA) this material is to be classified as non-hazardous (see also section 16)
OTHER INFORMATION 16.1. Other information IMA classification rules quartz
The Industrial Minerals Producers (IMA) have determined that respirable crystalline silica (=RCS) is best to classified as STOT RE Category 1 because of the danger of silicoses. STOT means ‘Specific Target Organ Systemic Toxicant’. RE means “Repeated Exposure”. Based on scientific evidence it is determined that is general necessary to inhale over a longer period repeated significant amounts of RCS on the working spot before possible health effect can occur. Because of the classification all products that contain RCS, despite the fact this is an impurity, additive or constituent has to be classified as:
- STOT RE 1, when de RCS concentration ≥10%;
- STOT RE 2, when de RCS concentration is between 1 and 10%.
Annex E UN Test N.5, extract from the Manual of Tests and Criteria
Annex F Marchwood Scientific Services flammable gas release test reports
MVV Devonport 117/563 2 February 2017
INTRODUCTION
Marchwood Scientific Services Ltd (MSSL) has been commissioned to perform an assessment of gas evolution for a provided sample of Incinerator Bottom ash (IBA).
Background- MSSL received a representative sample of IBA from MVV Devonport referenced MVV_IBA_250117_52_AWr for analysis. The analysis requirement was to assess the material for flammability/gas evolution in accordance with the latest United Nations Recommendations on the Transport of Dangerous Goods (ADR Regulations) In accordance with the ADR Regulations a substance would be listed as Class 4.3 Hazardous when a substance, which, when in contact with water emits a flammable gas. The regulations also state that Packing Group 111 shall be assigned to any substance which reacts slowly with water at ambient temperature such that the measured rate of evolution of flammable gas is greater than 1 litre per kilogram of substance per hour and which does not meet the criteria of Packing Groups 1 and 11. The regulations include the Manual of Tests and Criteria Part 111 Section 33.4 and specify a test that must be undertaken to assess a substance as above. The provided sample of IBA was tested by MSSL using methods in accordance with those specified, TEST RESULTS-
The results of the laboratory analysis of the provided samples are provided below. Note that for all of the tests undertaken the material was ground to µm particle size. This was not only required in order to obtain a sample of the correct specification for testing but also the regulations require this if initial inspection of a material indicates the presence of finer particles. This would indicate that the material may breakdown in transit.
Test specified in Section 33.4.1.4.3.2-
In accordance with this test a small quantity of substance ( diameter) was placed in a trough of demineralised water at 20° C
RESULT- NO GAS OBSERVED
Test specified in Section 33.4.1.4.3.3-
In accordance with this test a small portion of the ground ( diameter) material was placed on a filter paper (as support) and floated on the surface of an evaporating dish containing distilled water at 20° C.
RESULT- NO GAS OBSERVED
Test specified in Section 33.4.1.4.3.4-
In accordance with this test a portion of the ground ( diameter) material was placed in a pile measuring 20mm high and 30mm diameter and a hollow made in the top of the pile. A few drops of water were then added to the hollow.
RESULT- NO GAS OBSERVED
MVV Devonport 117/563 3 February 2017
Test specified in Section 33.4.1.4.3.5-
This method specifies that a portion of the ground ( µm diameter) material is placed in a conical flask and then water applied to the solid using a separating funnel. The rate/quantity of gas evolved, if any, is then measured over a prolonged period and the evolution rate calculated and compared with the limit value of 1 litre of gas evolved per kilogram of substance per hour.
Results- The method does not specify the quantity of water that should be applied to the solid material therefore some experimentation was undertaken. In order to accurately measure the rate of gas evolved a Buchner conical flask was used with side-arm. The side arm of the conical was then connected to a Tipping Bucket gas flow meter designed to measure very low gas flows. The Tipping Bucket gas flow meter is employed as part of the approved apparatus used as part of the Biomethane Potential (BMP) and Dynamic Respiration (DR4) tests. The separating funnel was placed onto the Buchner flask and the water added. The separating funnel was then removed and the Buchner flask sealed. The gas evolved was then measured. Applying a few drops of water resulted in no measurable gas flow. The gas was monitored over a period of 5 hours to check there was no delayed reaction. The test was then repeated using increasingly large quantities of water and the gas evolution measured. The results are provided in the table below-
Quantity of Solid used (grams) Quantity of water added (mls) Quantity of Solid used (kilograms) Gas evolved (litres/kilogram per hour) # Limit value (litres/kilogram per hour) Test Pass/Fail 19.2 3.0 0.019
1 Pass 18.6 10.0 0.019
1 Pass 18.4 20.0 0.018
1 Pass
this value is the maximum gas evolution rate per hour. Visibly some very small short-lived
emissions of gas were observed within the first minute of each of the tests but these were below the measuring capabilities of the test apparatus.
CONCLUSION The measured gas evolution rate for this material was below the 1 litre/Kg/Hour limit value.
Annex G Report by The Hydrogen Hazards Unit, London Southbank University
Asse
EXPL SCHO LOND 103 B LOND SE1 0
http://
Rep ssment of e OSION & F OL OF EN ON SOUTH OROUGH ON AA www.lsbu.a port to th the likel explosion FIRE RES NGINEERI H BANK ROAD ac.uk/esbe e Marine y hydroge (13th Ja 11t EARCH G NG UNIVERSIT /efrg/inde
Acciden
en concen nuary, Pl
th April 20 ROUP TY x.shtml t Investig tration i ymouth a 017 ation Bra nvolved i anchorage
anch n the Nor e) trader
Assessment of the likely hydrogen concentration involved in the Nortrader explosion (13th January, Plymouth anchorage)
From details of the accident investigation supplied it is clear that the explosion was initiated in the fo’c’s’le and propagated back into the main cargo hold causing further ignition of a second much larger volume of hydrogen.
In this case we can safely assume that the flammable gas mixture has not detonated (see Note A) and the explosion can be classed as a vented deflagration. In simple terms the explosion is likely to have proceeded as follows.
Prior to the explosion the cargo hold was nominally sealed. Following the propagation of the explosion back into the cargo hold the pressure in the hold will have begun to rise as hydrogen/air is combusted. The flame will accelerate (depending on the hydrogen concentration and turbulence generated by flow over obstacles) as it propagates down the length of the hold. After a period of time (in this case estimated to be of the order of 0.15s) the pressure generated has caused the cleats to fail and hatches to lift. Depending on the rate of combustion and hence rate of pressure rise the lifting of the hatches will limit the ultimate pressure experience by the hold/hull to some degree i.e. they act as explosion relief vents. In the case of hydrogen, vents that are both very large and that can open rapidly (low inertia) are usually required to prevent an enclosure experiencing a significant overpressure above that required to open the vent.
The primary aim of this report is the estimation of the likely concentration of hydrogen present in the hold at the time of ignition.
Minimum possible quantity of hydrogen The absolute minimum quantity of hydrogen involved in the explosion i.e. that needed to lift the weight of the hatches and break the cleats can be readily estimated by equating the hatch weight combined with the breaking force of the cleats to a force exerted on the hatches by an internal pressure in the cargo hold.
From the data supplied, the mass of all hatches (8x14 Tonne + 4 Tonne) equates to 116 Tonne and multiplying by gravity (9.8 m/s2) a weight of 1138 kN. For the cleats the total break force works out to be ((56 x 8.75 Tonne + 10 x 9 Tonne) x 9.8 = 5690 kN. This then gives a combined force required to lift the hatches and break the cleats (F) of 6828 kN.
The internal pressure in the hold required to produce this amount of lift can then be estimated as F divided by the total surface area of the hatches (S) of 556 m2. This then gives a pressure (Pv) of 12kPa (1.78 psi, 0.123 bar, 0.121 atm).
For explosions inside closed volumes the pressure generated can normally be equated to that determined theoretically by assuming constant volume adiabatic combustion. This pressure is most accurately determined using a thermochemical equilibrium solver such as STANJAN1 or GASEQ2. The results of such calculations for hydrogen/air at an initial pressure of 1 atm and 298K are given in Figure 1.
It can be seen from figure 1, that the concentration required to produce 0.121 atm is theoretically very small and works out to be only 0.3%(v/v). Estimating the ullage volume of the hold (Note B) as 1900 m3 this gives a volume of hydrogen of 6m3 .
However, as can also be seen from figure 1, this value is well below the Lower Flammable Limit of 4% (v/v). For an explosion to generate close to 0.121 atm at 0.3% hydrogen (v/v) the 0.3%(v/v) would need to be confined to a localised region (e.g. all in a thin layer at the top of the hold or in a localised plume close to the fo’c’s’le) at over 4% (v/v). For the situation described in this incident it seems highly unlikely that there would be significant stratification of hydrogen in the hold for the following reasons:
1 STANJAN is a computer program which calculates chemical equilibrium using the method of element potentials. It was developed by Professor W. C. Reynolds, Department of Mechanical Engineering, Stanford University, Stanford, CA 94305 2 GASEQ is a thermochemical equilibrium solver for combustion problems developed by Chris Morley. http://www.gaseq.co.uk/
From information provided by the MAIB it seems likely that the aluminium in the ash and hence the hydrogen production was distributed fairly evenly across the surface of the ash The generation and hence release of hydrogen to the cargo ullage was likely slow and chronic it would therefore be unlikely to have a large plume that would extend to ceiling level before mixing. The relatively high temperature of the waste bed would induce convection currents in the cargo hold and aid mixing.
On the assumption that the hydrogen is well mixed above the cargo the concentration in the cargo ullage would have to have been at least at the lower flammable limit of 4% for ignition to occur.
However, if well mixed, the ullage concentration would almost certainly have been significantly above 4%(v/v) (concentration as volume per volume percentage). Whereas with most fuels there is negligible difference between the concentration at which a mixture becomes flammable and when it becomes explosive, this is not true for hydrogen. For most fuels the upwards flammability limit corresponds to an adiabatic flame temperature of around 1000°C and the concentration is typically around 50% of the stoichiometric3 concentration. In the case of hydrogen, however, the theoretical adiabatic flame temperature of a 4% (v/v) mixture is only 350°C and the concentration is 14% of stoichiometric. The reason for this is related to the high diffusivity of hydrogen in comparison to oxygen. Preferential diffusion occurs and the flame becomes unstable and breaks into cells. The hydrogen concentration at the convex flame cells increases and hence the localised flame temperatures, in excess of the calculated adiabatic flame temperature, are generated at the flame fronts. Near LFL (i.e.4%(v/v)) mixtures of hydrogen/air are therefore less “explosive” than near LFL mixtures of most other fuels (smaller temperature/pressure rises, slower flame velocities and incomplete combustion). Between 4 & 9 % the overpressure experienced is some fraction of that predicted by thermodynamic calculation, as shown by the green shaded region on figure 1, (probably almost zero for most quiescent vessels) and depends on the geometry of
3 The minimum concentration required to react with all the oxygen present. In the case of hydrogen/air 29.5%(v/v) .
the vessel, the point of ignition, initial turbulence of the mixture, and obstructions in the vessel which could cause turbulence. Flammability limits are often determined observing flame propagation in a tube. The 4%(v/v) limit is for upwards flame propagation i.e. ignition source at the bottom of a vertical tube . If ignition is at the top downwards propagation the length of the tube is not observed until 9%(v/v). If the tube is mounted horizontally sideways propagation is achieved around 6%(v/v). Additionally, mixtures at the upwards LFL of 4% require a flame or a high energy spark for ignition (15kV & 10J is typical for test apparatus).
Returning to the Nortrader incident, it was reported that there was an ignition of a volume of hydrogen/air mixture, starting inside a switch box in the fo’c’s’le, which then propagated back into the cargo hold (probably via an insecure cargo light access plate). For this to have occurred it seems likely that the hydrogen concentration in the cargo hold (and the fo’c’s’le) would have been at least 6%(v/v). At less than 6%(v/v) it’s unlikely the ignition in the foc’s’le would have propagated back into the cargo hold. For the foc’s’le to contain 6%(v) hydrogen the mixture vented into there from the hold would have had to have been at least that concentration. Additionally given the shape of the cargo hold, mixtures at much less than 6%(v/v), would quite likely not have generated sufficient overpressure to lift the hatches.
In summary it is concluded that the hold was most likely at a concentration of at least 6%(v/v) 114 m3 of hydrogen assuming an ullage volume of 1900 m3.
Maximum possible quantity of hydrogen. In order to try to place an upper bound on the hydrogen concentration in the hold, calculations have been carried out to gauge the likely effectiveness of the lifting of the hatches in reducing the overpressure experience by the vessel structure. It is clear that there was relatively little damage to the vessel. Regarding explosions occurring in industry in general from a comparison of damage to vulnerable refinery parts, by Stephens as cited in [1], significant damage might be expected at 0.3 bar and serious damage at 0.5 to 1 bar. It is also likely from the photos following the explosion that the hatchcovers were not lifted significantly since they are not
significantly displaced from their original positions (some returned to their original positions but were clearly lifted to an extent as their cleats had broken) and so the vent area that was realised during the explosion would have been a relatively small fraction of the total hatch area.
One of the most important parameters that is required for explosion relief vent sizing is the rate of pressure rise within the vessel. It is found that the maximum rate of pressure rise in a vessel of volume (V) is characterised by the “cubic law” given below:
G 3 / 1 max K constant ) / ( V dt dP
KG is known as the explosion index (deflagration index) and normally quoted for hydrogen as 550 bar.m.s-1. KG is a measure of the violence of an explosion. A value of 550 bar.m.s-1 is a worst case value applicable to hydrogen/air mixtures at around 30%(v/v). Hydrogen has one of the highest KG values and is therefore difficult to vent. However, at lower hydrogen concentrations, flame speeds and rate of pressure rise reduce considerably. The KG value at lower concentrations KGc can be estimated from the eqn.
max S S K K c G Gc
Where Smax is the maximum fundamental burning velocity (Smax= 3 m/s for hydrogen/ air), Sc is the fundamental burning velocity at a specific concentration. At 10% hydrogen in air (burning velocity 0.1 m/s) this suggests a KG of only 18 bar m s-1. Measured KG for low concentrations of hydrogen are sparse but data is presented for H2/O2 mixtures at an initial pressure of 5 bar absolute and 20°C in Reference 2. At 10%(v/v) the KG value was observed to be only 10 bar m s-1, reducing to only 0.8 bar m s-1 at 6%(v/v). This would suggest that the above equation is possibly slightly pessimistic.
NFPA68 [3] provides a number of venting correlations intended for the design of relief vents on process plant. The equation, from NFPA68, below applies to enclosure capable of withstanding more than 0.1 bar.
3 2 5722 0 5817 0 10 1.0 1754 .0 0567 .0 log 1265 .0 V P P P K A stat red red G
Where
A
geometrical vent area (m2)
KG
Explosion index bar m s-1
Pstat
Static activation pressure (bar)
Pred
Reduced explosion pressure (bar)
V
enclosure volume (m3)
For long enclosures an expression to calculate additional vent area to be added to that calculated from the above equation is given by.
750 2 2 D L K A A G v
Unfortunately this only applies up to a length to diameter ratio of 5. Taking the length to diameter as 5 in the case of the cargo hold will potentially underestimate the required area.
The above equations can be applied to the Nortrader explosion to gauge what scale of vent opening would have been needed to be realised in order to keep the overpressure experience by the vessel hull etc ( i.e. Pred ) to a level commensurate with the observed damage, for varying initial hydrogen concentrations (by varying KG). Assuming that Pred = 0.3 bar and taking Pstat as 0.123 bar the vent area can be determined for different KG values and hence hydrogen concentrations. The free volume (ullage) in the cargo hold was estimated as 1900 m3 (Note B). These are summarised in the table below.
H2%(v/v) KG (bar m s-1) Pred (bar) Vent Area, m2 6 1 0.3 * 10 18 0.3 40
15 70 0.3 103 30 550 0.3 694 6 1 0.5 * 10 18 0.5 30 15 70 0.5 77 30 550 0.5 515 6 1 1 * 10 18 1 20 15 70 1 51 30 550 1 344
- Correlation goes negative for KG values less than 3 suggesting little vent area
would be required.
It can be seen from the above table that above 10% Hydrogen the required vent area increases substantially. Additionally the vent inertia of the hatch panels is considerably in excess of that recommended for explosion relief vents (i.e. 200 kg/m2 as opposed to 20 kg/m2). Bjerketvedt [1] et al state that, in their experience vent panels of 30 to 50 kg/m2 are too heavy to have a significant effect on peak pressure. The higher the hydrogen concentration and rate of pressure rise the greater the influence of the vent intertia.
It is clear that during the incident the hatch panels did move and vent the explosion to some degree, but it seems unlikely that they could have been opened sufficiently within the timescales required to effectively vent anything other than a weak explosion. Had the panels been lifted sufficiently to realise a vent area of 15m2 that would equate to lifting all the panels vertically to a height of around 0.1m.
Overall, while it is difficult to be certain, the maximum hydrogen concentration in the cargo hold was unlikely to have been much in excess of around 9%(v/v) hydrogen where combustion would become fast and complete. This would correlate with a flame temperature of around 1000°C.
Conclusions In summary, considering the evidence available, the likely hydrogen concentration in the cargo hold at the time of the explosion was in the range of 6 to 9 %(v/v). This equates to a volume of between 114 and 171 m3. The damage could have been caused by a smaller total amount of hydrogen confined to a localised volume at higher concentration, but this seems less likely given the distributed and slow/steady nature of the hydrogen release. The upper bound on the concentration is based on the limited damage observed and the displacement of the hatches and their likely poor effectiveness at venting an explosion (limiting overpressure) at higher concentrations.
References
D. Bjerketvedt et al. “Gas Explosion Handbook”, Journal of Hazardous Materials 52 (1997) 1-150
Schroeder V., Holtappels K., Explosion characteristics of hydrogen-air and hydrogen-oxygen mixtures at elevated pressures, International Conference on Hydrogen Safety, September 8-10 2005, Congress Place, Pisa, Italy
NFPA 68, “Guide for venting of deflagrations”, National Fire Protection Association, Quincy, MA, 2002 Note A The distinction is important in assessing the likely consequences of an explosion. During a deflagration the flame propagation is subsonic and the pressure produced by an explosion inside an enclosure can be approximated to a static pressure, whereas a detonation exerts localised shock loadings. In the case here, detonation can be excluded on the basis that primarily a) likely hydrogen concentration was too low to sustain a detonation and also b) likely insufficient run – up distance for a DDT (Deflagration to Detonation Transition) considering that the ullage is relatively uncongested and c) the nature of damage is inconsistent with a detonation.
Note B The volume was calculated by taking the hold dimensions as 61.5 x 9 x 6.16 = 3409 m3 and then subtracting the volume of the cargo (1505 m3 ) giving an ullage volume in the hold of 1900 m3. The cargo volume was estimated assuming a load of 2333 tonne and a density of 1550 kg/m3. .
Figure 1 The AICC overpressure produced for a given hydrogen/air mixture
Annex H MAIB safety flyer
SAFETY FLYER TO THE SHIPPING INDUSTRY Explosion of gas released from cargo of unprocessed incinerator bottom ash on Nortrader, 13 January 2017 Narrative At 1447 on 13 January 2017, the dry cargo vessel Nortrader suffered two explosions in quick succession. The vessel was anchored in Plymouth Sound and had loaded unprocessed incinerator bottom ash (U-IBA) the day before at Plymouth. The first explosion was in the forecastle store and the second in the cargo hold. The force of the explosion in the cargo hold dislodged all the heavy steel hatch covers and all but one of the holding down cleats were broken. Many of the hatch covers and sections of the hold coaming were distorted. The chief engineer was in the forecastle store at the time, testing the emergency fire pump. He suffered second degree burns and had to be airlifted to a nearby hospital. His recovery was prolonged and he was only declared fit for work again 4 months later. The vessel was out of service until 20 April. Nortrader at Victoria Wharf, Plymouth
The MAIB investigation established the following: •• Nortrader’s master had received an email from the vessel’s charterer that the intended cargo of U-IBA was a ‘non dangerous’ cargo. •• Hydrogen gas released from the cargo seeped into the forecastle store through a slack cargo light access cover. The hold was unventilated at the time. •• All the natural ventilation outlets in the forward compartment, including the forecastle store, were closed in preparation for imminent heavy weather. This allowed hydrogen to accumulate in the forecastle store. •• The starter panel for the emergency fire pump had a broken fixing lug at its door and was therefore not sealed. •• The first explosion was likely to have been triggered by the arcing between the contact terminals of the emergency fire pump starter panel when it was switched off. •• There had been 34 similar shipments of U-IBA from Plymouth to the Netherlands. Despite U-IBA not being listed in the International Maritime Solid Bulk Cargoes (IMSBC) Code, no steps had been taken to seek approval from the competent authorities for its carriage by sea. Safety lessons •• The only approved means of ensuring safe carriage of solid bulk cargoes is through the application of the IMSBC Code. The schedules included in Appendix 1 of the Code clearly classify cargoes and identify the necessary requirements for safe carriage. Where no schedule is listed for a specific cargo, the required classification procedure is stated at Section 4 of the Code, with further guidance provided by MSC Circ.1453, Marine Guidance Note (MGN) 512 and the guidance document Carrying solid bulk cargoes safely published by Lloyd's Register, UK P&I Club and INTERCARGO. •• The application of the IMSBC Code has been mandatory since 2011. It replaced the Code of Safe Practice for Solid Bulk Cargoes (BC Code), which was for guidance only. •• The IMSBC Code requires the shipper to provide the vessel’s master with a comprehensive list of information about the intended cargo. This flyer and the MAIB’s investigation report are posted on our website: www.gov.uk/maib For all enquiries: Marine Accident Investigation Branch Email: maib@dft.gsi.gov.uk First Floor, Spring Place 105 Commercial Road Tel: 023 8039 5500 Southampton, SO15 1GH
FD06040 | 2012_英国_carbon-monoxide-poisoning-on-board-the-sports-cruiser-emma-louise-with-loss-of-2-lives__20.pdf
分类:06_境外及港澳台调查报告 | 年份:2012 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
M A R I N E A C C I D E N T I N V E S T I G AT I O N B R A N C H ACCIDENT REPORT ACCIDENT REPORT VERY SERIOUS MARINE CASUALTY REPORT NO 1/2023 APRIL 2023 1 Carbon monoxide poisoning on board the sports cruiser Emma Louise resulting in two fatalities at Port Hamble Marina, River Hamble, England on 11 January 2022 Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an such investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2023 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. All reports can be found on our website: www.gov.uk/maib For all enquiries: Email: maib@dft.gov.uk Tel: +44 (0)23 8039 5500 SUMMARY On the morning of 12 January 2022, two men were found unconscious on board the sports cruiser, Emma Louise, which was berthed in Port Hamble Marina, on the River Hamble, England. It was later established that both men had died because of carbon monoxide poisoning. The two men had boarded the boat the previous evening and had left the engine running while they remained in the boat’s covered cockpit area. The MAIB investigation concluded that the boat’s exhaust gas, which contained carbon monoxide, had likely been funnelled into the cockpit by an inflatable towable ski ring that was suspended from the transom of Emma Louise. The levels of carbon monoxide would have increased in the cockpit, rendering both men unconscious and causing their deaths. There was no means of alerting the men to the danger because a carbon monoxide alarm had not been fitted to the boat. In November 2022, the MAIB participated in raising awareness of hazards to boat users during Carbon Monoxide Awareness Week and, in conjunction with the publication of this report, has issued a flyer to summarise this accident and highlight the key safety lessons to the boating community. Emma LouiseThe sports cruiser Emma Louise moored starboard side to a finger pontoon.
2 FACTUAL INFORMATION Narrative At about 1700 on 10 January 2022, the owner of Emma Louise and his brother-in-law arrived at Port Hamble Marina, having travelled from their homes in Slough, England. They boarded Emma Louise, which was moored to a pontoon, and prepared to spend two nights on board. Shortly afterwards they went ashore to eat at a nearby restaurant and, at about 2000, returned to Emma Louise, where they slept on board. On the morning of 11 January, the owner went home to attend to work matters while his brother-in-law visited Hamble. During the late afternoon they met up outside the restaurant in Port Hamble Marina and boarded Emma Louise at approximately 1700. It was drizzling with light, occasionally gentle, northerly wind, the air temperature was 10˚C and there was no swell; there were squally rain showers later in the evening. The men started the boat’s engine and switched on a portable electric radiator, the cockpit lights, navigation lights and the entertainment radio. They then sat in the cockpit with its canopy closed and each drank a beer. At 1727, the owner called his wife and told her that he and his brother-in-law planned to stay on board Emma Louise that evening and have a meal and some wine. At about 1000 on 12 January, the owner’s wife attempted to call her husband but he did not answer. She became concerned and called the Port Hamble Marina office. As a result of her call, two of the marina’s staff walked to the pontoon. They found Emma Louise with its engine idling. They could see the two occupants through the closed cockpit canopy window and both of them were unresponsive when the marina staff called out to them. The marina staff opened the canopy and turned the boat’s engine off. They then checked the two men and called the emergency services, having been unable to find a pulse on either of them. At about 1030, ambulance staff attended and were followed shortly afterwards by officers from both the police and the fire and rescue service. At around 1050, both men were pronounced deceased. The casualties Emma Louise’s owner, William Traynor, was 44 years old, 1.87m tall and weighed 96kg. He bought the boat in May 2020 and later named it Emma Louise, initially keeping it on the River Thames. In May 2021, he relocated Emma Louise to Port Hamble Marina, and he and his family frequently used it on the Solent. The owner’s brother-in-law, Martin Steventon, was 39 years old,1.76m tall and weighed 71kg. He had little boating experience but enjoyed spending time on board Emma Louise with his brother-in-law. On 19 January, postmortems identified the primary cause of death as Carbon monoxide (CO) toxicity to both men. The levels of blood carboxyhaemoglobin (COHb)1 saturation were recorded as 75% for the owner and 72% for his brother-in-law. The postmortems indicated blood alcohol levels of 0.5 and 1.5 times the drink driving limit in England for the owner and his brother-in-law respectively; the postmortem report stated that the alcohol levels could possibly be attributed to putrefaction of the bodies. Emma Louise description Emma Louise was a 5.5m glass reinforced plastic Fletcher 18 GTS sports cruiser, built in 1996. The boat had a cockpit area with a cushioned transverse bench seat to aft, below which the engine was fitted into a separate compartment (Figure 1). The cockpit had two pedestal mounted seats; the helm and boat controls were mounted in a console in front of the starboard seat. There was a low wraparound 1 Carboxyhaemoglobin describes the combination of CO and haemoglobin that forms in red blood cells when CO is inhaled or produced in normal metabolism.
3 Figure 1: Emma Louise plan (a) and side elevation (b) For illustrative purposes only: not to scale Console Battery compartment Denatured alcohol stove Bilge blower Ventilation grille Ventilation grille Seat Bench seat Engine Engine Transom PORT STARBOARD Covered cockpit Enclosed cabin Portable electric cool box (under deck hatch) Portable electric radiator Mattress Seat Cabin entrance Windscreen a Closed forward hatch AFT FORWARD b Flagpole socket Canvas canopy Waterline exhaust Transom Covered cockpit Enclosed cabin windscreen to the front of the console. A single burner denatured alcohol stove was stowed behind a hatch in the port side inner bulwark of the cockpit. A portable electric cool box was stowed below a hatch in the cockpit floor. The cockpit area was covered by a canvas canopy, which had clear plastic windows and was supported by a tubular frame and fastened to the hull and windscreen by means of snap poppers. The canopy included panels that provided access and ventilation into the cockpit when they were open; these were secured with heavy duty zips and twist connectors when closed. There were small gaps where the canopy fitted around a railing mounted on the boat’s transom. The canopy was otherwise well-fitted, with no large air gaps where it met the boat’s hull and windscreen, and the canvas material was in good condition with no rips. Forward of the cockpit area there was a small enclosed cabin with a mattress. The cabin ceiling was fitted with a hatch that opened onto the foredeck. Emma Louise was equipped with a four cylinder 3.0 litre inboard petrol engine that developed 135 horsepower through a steerable outdrive. The engine had a wet exhaust system, which vented the exhaust gases and cooling water through a hull fitting in the centre of the boat’s transom at the waterline.
4 An electric fan, known as a bilge blower, ventilated the engine compartment through a grille in the port side of the hull’s topsides. There was a separate battery compartment adjacent to the engine compartment, with a ventilation grille to the starboard side of the hull’s topsides. The owner had the stern drive rebuilt and the engine replaced in August 2021. The boat’s electrical power was supplied by 12 volt direct current (VDC) batteries, which were charged by an alternator via a belt drive from the engine. The batteries operated the engine starter motor, navigation lights, cockpit lights, entertainment radio, bilge blower and portable electric cool box. A shore power cable supplied 240 volt alternating current (VAC) to a double domestic socket, into which an 800 watt portable electric radiator was plugged. Emma Louise and crew as found condition The marina staff found Emma Louise moored starboard side to a finger pontoon with its bow pointing to the north. The boat’s engine was running at idle out of gear with the bilge blower turned off. The canvas canopy was zipped closed and fastened down and the cabin ceiling hatch was secured shut. The denatured alcohol stove was stowed away. The entertainment radio, cockpit lights and navigating lights were turned on and the portable electric cool box, which contained some food and beer, was plugged in. An inflatable towable ski ring (known as a ringo) was suspended from a flagpole socket at the transom of Emma Louise (Figure 2). The ringo was protected by a removeable cover. The 240 VAC shore supply cable was plugged into a socket on the pontoon; the portable electric radiator was switched on and was warm. The owner of Emma Louise was lying on his back on the deck, parallel to the aft bench seat, and his brother-in-law was slumped in the seat that was behind the helm, with his face against the electric radiator. Both men were fully clothed. They had each consumed half of their bottle of beer; the meal and red wine were untouched. There had been no activity on either of their mobile phones since 1800 on 11 January 2022. Figure 2: Emma Louise's transom with ringo hanging from flagpole socketLooking down onto the ringo in its removable cover. It is clearly hooked onto the flagpole socket and rests against a folded-up engine mounting board as it hangs over the motor cruiser’s transom. Boat inspection tests Emma Louise was relocated to Southampton, England, where the MAIB carried out a series of tests in its as found condition; 160kg of dispersed weight was added to simulate the effect of the two men on the boat’s draught and trim. There were light northerly breezes during the tests, with air temperatures of approximately 6˚C. The initial series of tests used a forward-looking infrared (FLIR)2, Optical Gas Imaging (OGI) camera to film the passage and direction of the engine’s exhaust gas. Gas detectors3 were also placed on the boat in the following locations: • above the waterline exhaust on the transom outside the canopy; • on top of the vertical cushion of the aft bench seat; 2 The FLIR camera was supplied and operated by FLIR Systems Ltd. FLIR OGI cameras can be tuned to the wavelength of specific gases such as CO and CO2 and make these invisible gases appear as dark smoke when filmed. 3 Honeywell BW™ Flex series portable multiple Gas Detector, capable of measuring up to 2000ppm of CO; ppm represents the number of units of a substance present in a million parts of another substance. Ringo under removable cover Flagpole socket
5 • on the console; • in the engine compartment. A domestic CO detector4 was also placed on the console. The test results from the idling engine showed that: • 2000 parts per million (ppm) of CO was detected in the atmosphere just above the waterline exhaust; • 2000 ppm of CO and 19.5% of oxygen (O2)5 was detected in the atmosphere in the covered cockpit above the bench seat; • The exhaust gas tended to funnel upwards from the waterline between the ringo and the boat’s transom (Figure 3a) and then seeped through small gaps between the boat’s canopy and transom railing (Figures 3b and 3c); • Exhaust gas was rising on convection currents above the portable electric radiator; • of CO was detected in the engine compartment; • The domestic CO detector on the console alarmed within 10 minutes of starting the test; • Light grey engine exhaust gas was emitted just below the waterline. The second series of tests carried out in the boat’s as found condition used CO gas test detectors6 with a greater CO measuring range than used for the initial tests. These were positioned just above the waterline engine exhaust and within the cockpit, with the following results: • ≤7000ppm of CO was measured in the atmosphere just above the waterline exhaust; • The CO concentration in the covered cockpit varied, with an average of 984ppm during a 120-minute test, reaching 1400ppm within 35 minutes and a peak value of 2000ppm after 100 minutes. A further test was carried out with the covered ringo removed from the transom (Figure 4) using the same CO detectors. The CO levels in the cockpit reached 200ppm after about 14 minutes before settling at around 300ppm after 30 minutes. Exhaust gas and boat ventilation Common sources of gas emissions found on pleasure boats include internal combustion engine and portable generator exhausts, cookers and cabin heaters. Typical exhaust emissions from a well-serviced petrol engine at idle can represent 50,000ppm (5%) CO, with the rest of the exhaust gas comprised mostly of carbon dioxide (CO2). Engines running at less than optimal conditions due either to wear or poorly adjusted fuel settings tend to emit both black smoke rich in unburnt fuel and a higher than normal CO content. Insufficient ventilation in boats can lead to the accumulation of dangerous CO levels where exhaust gases had entered cabins and cockpits. Carbon monoxide poisoning CO is a highly poisonous gas that is 3% lighter than air. It is a colourless, odourless and tasteless product of incomplete combustion. When CO is inhaled COHb forms, which readily replaces oxygen in the blood. Common symptoms of low exposure to CO poisoning include headache, nausea, stomach pain, difficulty breathing, tiredness and confusion. The effects become more severe as the CO concentration and duration of exposure increase (Table 1) and can be expedited where the atmosphere is also deficient in O2 and rich in CO2. The effects of a COHb level of 60 to 70% in blood include unconsciousness, convulsions, respiratory failure and death. 4 CO detector conformed to British Standard EN 50291-1:2010+A1:2012 Electrical apparatus for the detection of carbon monoxide in domestic premises. 5 Normal O2 content in air is 21.5%. 6 Dräger X-am® 5000 multi gas detectors with data-logging functionality capable of measuring up to 10,000ppm CO.
6 Figure 3: Representation of the likely passage of exhaust gas from waterline exhaust (a) into covered cockpit (b and c) based on the FLIR OGI camera Image A shows the sports cruiser’s transom angled to show the railings behind the ringo as it hangs from the flagpole socket. Three arrows between the transom and the ringo indicate how gas from the waterline exhaust tended to funnel up behind the ringo towards the small gaps between transom railings and the canvas canopy. Image B is an exterior close-up highlighting gaps in the sport cruiser’s canvas canopy where it is fitted around two bars to mount railings to the transom. Arrows illustrate how the exhaust gas rose from behind the top of the ringo toward these gaps and seeped into the otherwise enclosed cockpit. Image C shows the gaps in the canopy from inside the cockpit. The railing bars sit behind an aft bench seat and arrows illustrate the path of the gas through gaps into the enclosed area. Exhaust gas enters cockpit through small gaps Ringo a b c Exhaust gas rises from waterline exhaust and funnels upwards behind ringo Small gap between canopy and transom railing Figure 4: Emma Louise's transom with ringo removed Stern view of the sports cruiser Emma Louise moored starboard side to a finger pontoon. The cockpit canopy is closed and the ringo has been removed to reveal the transom. Grab rails run either side of central transom steps and a flagpole socket attached near to the top of starboard side rail is indicated. Another arrow points to the central location of the wet exhaust below the swim platform and just above the waterline. Flagpole socket Waterline exhaust
7 Table 1: Effects of carbon monoxide exposure (NORSOK Standard Z-013) CO (concentration) Physiological effects 1500 ppm Headache after 15 minutes, collapse after 30 minutes, death after 1 hour 2000 ppm Headache after 10 minutes, collapse after 20 minutes, death after 45 minutes 3000 ppm Maximum "safe" exposure for 5 minutes, danger of collapse in 10 minutes 6000 ppm Headache and dizziness in 1 to 2 minutes, danger of death in 10 to 15 minutes 12800 ppm Immediate effect, unconscious after 2 to 3 breaths, danger of death in 1 to 3 minutes Carbon monoxide detectors CO detectors are relatively inexpensive and are both easy to install and test. They are designed to sense CO levels that have accumulated over a period of time or suddenly increased, which would then trigger an audible and visual alarm. CO detectors for domestic use in the UK are required to meet BS EN 50291- 1, while detectors that comply with the more stringent BS EN 50291-2 standard are best suited for boats. Both types are required to activate an alarm when predetermined levels of CO are detected (Table 2). Table 2: British Standard CO detector alarm concentration and activation levels CO (concentration) Alarm must not activate before Alarm must activate before 30 ppm 120 minutes Not applicable 50 ppm 60 minutes 90 minutes 100 ppm 10 minutes 40 minutes 300 ppm Not applicable 3 minutes Carbon monoxide legislation and information At the time of the accident CO detectors were not required to be fitted on board recreational craft operating in UK coastal waters. The Royal Yachting Association (RYA) provided guidance on the potential sources and danger of CO on its website, recommending that CO alarms were fitted on board boats and regularly tested by the owners. Pleasure craft operating on the majority of the UK’s inland waterways were expected to undergo a Boat Safety Scheme (BSS)7 inspection every 4 years. The BSS inspection included an assessment of the boat’s ventilation and, since April 2019, had required that a CO alarm was fitted on board. The BSS publication Carbon Monoxide Safety On Boats was produced in collaboration with the Council of Gas Detection and Environmental Monitoring (CoGDEM) and was updated in May 2019. The publication was available on the BSS and CoGDEM websites and highlighted the hazard presented by CO, including a warning for mariners that: on a moving boat and even when moored, cockpit awnings can act as a funnel to draw engine gas inside the boat. [sic] 7 The purpose of the BSS is to help minimise the risk of boat fires, explosions or pollution harming users of inland waterways.
8 On the purchase of CO detectors, it advised boat owners to: … choose ones that meet the international standard BS EN 50291-2; these are best suited for boats. Some river and coastal marinas have voluntarily adopted the BSS inspection scheme for resident boats but this was not a requirement at Port Hamble Marina. In 2015, the UK All-Party Parliamentary Carbon Monoxide Group published its Carbon Monoxide: From Awareness to Action report that highlighted many CO safety challenges, including the difficulties of raising and relying on CO awareness to ensure individuals are adequately protected from the dangers. Similar accidents Over the past 10 years the MAIB has investigated five accidents involving CO poisoning on pleasure vessels that (including this one) resulted in the tragic loss of nine lives. In April 2014, two recreational boat users died of CO poisoning while sleeping on board the motor cruiser Arniston when gas leaked from a portable generator exhaust (MAIB Report 2/20158). The occupants had not been alerted to the presence of CO because the alarms fitted on board did not work. The MAIB made a recommendation to multiple organisations, including the BSS, MCA, RYA and CoGDEM to coordinate efforts to raise awareness in the pleasure boat community about the dangers of CO and the importance of fitting CO alarms. In June 2016, CO poisoning resulted in two fatalities on board the motor cruiser Love for Lydia, which was licenced to operate on an inland waterway (MAIB Report 9/20179). The petrol driven inboard engine had been left running while alongside, probably to charge batteries, causing the exhaust from the engine to fill the cockpit canopy and spread into the cabin. No CO alarm was fitted on board and the occupants were overcome by the gas. The MAIB made several recommendations, including to the MCA to continue to build on current initiatives by coordinating relevant organisations to focus efforts on raising the awareness of the dangers of CO and the importance of fitting carbon monoxide alarms. It also made a recommendation to the BSS regarding the compulsory installation of CO alarms in craft participating in the BSS scheme. In November 2016, the owner of pleasure boat Vasquez (MAIB Report 18/201710) was overcome and died from CO poisoning when exhaust gas transferred from the engine compartment into the boat’s enclosed canopy and cabin. The petrol engine’s exhaust system, which had been modified during the boat’s life, had leaked into the engine compartment. No CO alarm was fitted on board. In December 2019, two men died of CO poisoning from a diesel cabin heater exhaust that was leaking into the cabin on board the motor cruiser Diversion (MAIB Report 4/202111). The cabin heater’s exhaust was not designed for marine use, its connection was not gas tight and the heater had neither been serviced nor checked by a professional heater installer. The boat’s owner and his friend were preparing to go to sleep when they were overcome by the CO; they were not alerted to the danger because no CO alarm was fitted on board. In 2020, the Office for National Statistics recorded 21 fatalities in England and Wales attributed to accidental CO poisoning in land-based scenarios. 8 https://www.gov.uk/maib-reports/carbon-monoxide-poisoning-on-motor-cruiser-arniston-with-loss-of-2-lives 9 https://www.gov.uk/maib-reports/carbon-monoxide-poisoning-on-board-the-motor-cruiser-love-for-lydia-with-the-loss-of-2- lives 10 https://www.gov.uk/maib-reports/carbon-monoxide-poisoning-on-motor-cruiser-vasquez-with-loss-of-1-life 11 https://www.gov.uk/maib-reports/carbon-monoxide-poisoning-on-motor-cruiser-diversion-with-loss-of-2-lives
9 ANALYSIS The owner of Emma Louise and his brother-in-law died from CO poisoning due to a build-up of exhaust gas within the boat’s covered cockpit while it was moored alongside. The CO was emitted as part of the exhaust gases released from the boat’s running engine; it is likely that the gases seeped under the canopy at the transom into the cockpit. The CO was able to accumulate and quickly reach fatal levels because the canopy was well-fitted with no large air gaps, which resulted in a lack of ventilation. The return to the boat When the two men returned to Emma Louise on the night of the accident the weather conditions were squally. Once they were on board and had turned on the cockpit lights they secured the canopy and switched on the portable electric radiator, probably, to keep warm and dry. There was no evidence that they planned to take the boat out on the river that evening so it is probable that the navigation lights were turned on in error. As the radiator was plugged into the domestic socket supplied by the shore power cable it is likely that the engine was started to maintain power to the cockpit lights, portable cool electric box and entertainment radio, which was supplied by the boat’s batteries. The source and path of carbon monoxide The alcohol stove had not been used on the evening of the accident and has been discounted as a potential source of CO. MAIB testing found no evidence of an exhaust leak inside the engine compartment that might have transferred into the cockpit. The tests confirmed that the engine exhaust exited freely into the atmosphere at the waterline (Figure 3a), indicating that the boat’s draught and the lack of swell did not set up a back pressure on the exhaust that might have affected engine performance. The amount of CO in the atmosphere at the exhaust during the tests (≤7000ppm) and the lack of black smoke in the exhaust gas emitted did not provide any indication that the engine, which had been replaced in the year before the accident, was defective. Although atmospheric conditions on the evening of the accident were not identical to the MAIB post- accident tests, it is likely that the passage of the exhaust gas into the boat would have been similar. When the engine was started it is probable that the warm exhaust gas rose and was funnelled between the ringo and the boat’s transom up to the lower edge of the canopy, where it then seeped into the cockpit through the small gaps around the transom railing (Figure 5). The CO rich and O2 deficient atmosphere that was detected above the aft bench seat during the tests showed the potential for the incoming gas to degrade the atmosphere in the cockpit. Although CO is only slightly lighter than air, it is possible that convection currents rising from the warm portable electric radiator caused the CO’ within the exhaust gas to mix with the air and distribute within the cockpit, which was fully enclosed by the canopy. The canopy was intact, fully closed up and well-fitted to the hull and windscreen, while the forward hatch was closed and the engine bilge blower was not running. Consequently, it is likely that only a small amount of the polluted atmosphere would have been refreshed with clean air. The collapse and poisoning The air quality in the cockpit’s atmosphere is likely to have deteriorated relatively quickly. The as found position of the two men suggested that the owner of Emma Louise was sitting on the aft bench seat and his brother-in-law was in the seat behind the helm at the time of the accident. Neither man was significantly under the influence of alcohol, so it is unlikely that their alcohol intake had a major effect on their physiology. It is possible that the air at their head height was sufficiently saturated with CO and CO2 and was slightly deficient in O2; this would have likely caused both men to fall unconscious at a similar time. The absence of mobile phone activity after 1800 and the fact that the meal and wine were untouched suggest that they fell unconscious not long after they arrived on board Emma Louise. The levels of accumulated CO identified during the MAIB tests combined with CO2 and air that was slightly deficient in O2 showed that similar exposure to the two men was sufficient for them to remain unconscious and for their blood COHb to rise above 70%, thereby causing their deaths later that evening.
10 Figure 5: Representation of possible path of exhaust gas within Emma Louise’s covered cockpit area For illustrative purposes only: not to scale Exhaust gas enters cockpit and circulates on convection currents above portable electric radiator in front of starboard chair Exhaust gas enters cockpit through small gaps between canopy and transom railing Exhaust gas rises from waterline exhaust and funnels upwards behind ringo Transom Covered cockpit Enclosed cabin AFT FORWARD Ringo Closed forward hatch Although the MAIB tests demonstrated that some exhaust gas did transfer into the cockpit when the engine was running with the ringo removed, it is likely that the two men’s exposure to CO would have been at a much lower level that probably would not have resulted in their deaths. CO is always present within the exhaust of an engine that runs on fossil fuel; however, the risk of CO poisoning can be reduced if a boat’s engine is not run while the vessel is stationary and canopies and cabins are well ventilated. Use of carbon monoxide detectors The MAIB tests showed that if either a domestic or marine approved CO detector had been installed in the cockpit of Emma Louise it would inevitably have alarmed within 10 minutes of the boat’s engine being started. This would have alerted the men to the presence of CO and provided them with an opportunity to stop the engine and ventilate the cockpit. An operational CO detector could have prevented the needless loss of lives in this case and also the tragic accidents on board the pleasure craft Diversion, Vasquez, Love for Lydia and Arniston. It is essential that CO alarms are fitted in any areas where carbon monoxide could accumulate and pose a risk to health, including boats’ cockpits and accommodation areas. Preference should be given to selecting detectors marked as meeting BS EN 50291-2, which are intended for use in a marine environment. It is critical to fit the CO alarm properly, following the manufacturer’s installation instructions, and to regularly test it. Although there is no requirement for pleasure boat owners operating from most coastal marinas to install a CO detector, the value of such an inexpensive and easy to fit safety device on all pleasure craft cannot be underestimated. It also makes good sense to adhere to the BSS inspection regime, which includes a requirement for CO alarms following the MAIB’s recommendation to the BSS as part of the Love for Lydia investigation. Carbon monoxide awareness The high number of MAIB investigations into CO-related fatalities involving pleasure craft over the last 10 years, coupled with the number of land-based fatalities due to CO poisoning in 2020, demonstrate the very real threat the gas poses. However, despite the range of good quality information produced by the RYA, CoGDEM and BSS, it appears that awareness of the danger of CO and how to prevent it causing harm remains low within the pleasure boat community.
11 Although MAIB recommendations made as part of the Arniston and Love for Lydia investigations to tackle this lack of awareness were accepted by the MCA and other stakeholders, the tragic loss of two lives in this accident demonstrates that there is further work to be done by industry stakeholders to raise CO awareness among users of coastal pleasure craft. CONCLUSIONS • The two men died on board Emma Louise as a result of CO poisoning due to a build-up of exhaust gas within the boat’s covered cockpit area where they were seated. • It is likely that the exhaust gas was funnelled into the covered cockpit of Emma Louise by an inflatable towable ski ring that was suspended at the transom. • The cockpit canopy on board Emma Louise was intact and well fitted and the forward hatch was secured. Therefore, there was little ventilation to enable either the CO to disperse or fresh air to enter the boat. • It is possible that convection currents rising from the warm portable electric radiator caused the CO within the exhaust gas to distribute within the cockpit. • The two men had no means of being alerted to the rising CO level before being rendered unconscious and then succumbing, as there was no CO alarm on board Emma Louise. • The increasing number of fatalities caused by CO poisoning on board pleasure craft indicates that there is further work to be done by industry stakeholders to raise CO awareness among pleasure craft users. ACTION TAKEN MAIB actions • In November 2022, the MAIB participated in the UK government’s Carbon Monoxide Awareness Week, released a statement from the Chief Inspector of Marine Accidents12 and produced an information video13 in support of the campaign. • The MAIB has issued a safety flyer highlighting the hazards presented by carbon monoxide and distributed this to marina operators, pleasure boat trade organisations and the yachting media in conjunction with the publication of this report. RECOMMENDATIONS Given the recommendations issued by the MAIB as a result of its Love for Lydia investigation, and the subsequent actions taken during this investigation, no further recommendations are made in this report. 12 https://www.gov.uk/government/news/carbon-monoxide-awareness-week-2022 13 https://www.youtube.com/watch?v=jNatvhBrlqo&ab_channel=MarineAccidentInvestigationBranch
12 VESSEL PARTICULARS Vessel’s name Emma Louise Flag UK Type Fletcher 18 GTS sports cruiser Registered owner Privately owned Manager(s) Not applicable Year of build 1996 Construction Glass reinforced plastic Length overall 5.5m Gross tonnage Not applicable Minimum safe manning Not applicable Authorised cargo Not applicable VOYAGE PARTICULARS Port of departure Not applicable Port of arrival Not applicable Type of voyage Moored Cargo information Not applicable Manning 2 MARINE CASUALTY INFORMATION Date and time 11 January 2022 in the early evening Type of marine casualty or incident Very Serious Marine Casualty Location of incident Port Hamble Marina, Hampshire Place on board Cockpit Injuries/fatalities 2 fatalities Damage/environmental impact None Ship operation Moored Voyage segment In port External & internal environment Light northerly wind; drizzle; 10°C. Persons on board 2
FD06041 | 2012_英国_carbon-monoxide-poisoning-on-motor-cruiser-vasquez-with-loss-of-1-life__MAIBInvReport-18_2.pdf
分类:06_境外及港澳台调查报告 | 年份:2012 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
M A R I N E A C C I D E N T I N V E S T I G AT I O N B R A N C H VERY SERIOUS MARINE CASUALTY REPORT NO 18/2017 AUGUST 2017 1 Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an such investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2017 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. All reports can be found on our website: www.gov.uk/maib For all enquiries: Email: maib@dft.gsi.gov.uk Tel: 023 8039 5500 Fax: 023 8023 2459 ACCIDENT REPORT Fatal CO poisoning on board motor cruiser Vasquez while moored at Cardiff Yacht Club 12 November 2016 SUMMARY At approximately 1200 (UTC1) on 12 November 2016, the owner of the 7.75m motor cruiser Vasquez fell unconscious after being overcome by carbon monoxide (CO) that had emitted from his boat’s inboard petrol engine. Although rescuers came to his aid and conducted cardio-pulmonary resuscitation, it was not possible to save his life. Two of the rescuers had to be treated for the effects of CO poisoning following the accident. The CO was found to have originated from the rubber bellows of the wet-exhaust system of the engine, which was not only leaking gas but also water. The boat’s engine had not been regularly serviced, and evidence revealed that the exhaust system of the engine had been modified during the boat’s life. Notwithstanding the initiatives already taken by various stakeholders from the recreational boating sector, there remains a significant task to raise boat owners’ awareness about the dangers of CO. Due to the odourless nature of CO, the fitting of a detector/alarm remains the only effective warning that the poisonous gas is present. Given the recommendations issued following the MAIB’s recent Love for Lydia investigation, no further recommendations are made. 1 UTC - Universal Co-ordinated Time. Figure 1: Vasquez
2 FACTUAL INFORMATION Narrative During the morning of 12 November 2016, Ray Milton travelled to Cardiff Yacht Club to check on his motor cruiser Vasquez (Figure 1), which was moored in the marina. Ray regularly visited the club to socialise with other club members, usually on a weekly basis, but on this occasion had not visited for a couple of weeks. He had arranged to meet a friend at the club that morning. At approximately 1120, Ray’s friend walked down to where Vasquez was moored stern-to. He stepped onto the starboard bathing platform and leaned into the cockpit canopy, which was unzipped on the starboard side. Ray was sitting at the helm position and the aft floor area had been lifted to give access to the engine bay. There was water in the bilge and Ray was running the electric bilge pump to clear it. There was also water in the cabin, which was unusual. Once the water level was below the starter motor of the engine, Ray wanted to see if the engine would start. He turned the ignition key and the engine started successfully. The friend suggested putting the engine in gear ahead while still moored so that the boat’s bow would lift slightly and allow the water in the cabin to run aft into the engine bay bilge, where it could be pumped out easily. Ray followed this suggestion and water was seen to be running aft and being successfully pumped out by the electric bilge pump. About 10-15 minutes after arriving, the friend left and he asked Ray to take the engine out of gear so that he could step back onto the pontoon. He expected to catch up with Ray later in the clubhouse. After the friend had stepped onto the pontoon, Ray re-engaged the engine and at some stage replaced the cockpit flooring above the engine bay. At 1210, as he walked to the clubhouse, the friend called Ray on his mobile phone; there was no reply. He assumed Ray was busy and would ring back. He entered the clubhouse and ordered a drink at the bar. Approximately 30 minutes later, he tried calling Ray again, but still there was no reply. At 1242, he called another club member whom he knew was on a boat near Vasquez and asked him to check on Ray. When the other club member reached Vasquez he found the engine still running ahead, but there was no sign of Ray. With the assistance of another club member, who was an off-duty firefighter and happened to be nearby, he managed to pull the stern lines in sufficiently so that they could step onto the aft bathing platforms. Initially there was no sign of Ray, but they then saw a foot next to the helm. Emergency response The firefighter undid the port aft zip of the cockpit canopy and entered the cockpit. He saw Ray lying head-down in a pool of water in the cabin, with his feet stretched aft as if he had fallen forward. The firefighter turned off the engine ignition and the other club member raised the alarm by firstly calling the clubhouse for assistance and then, at 1248, calling for an ambulance. Ray was rolled onto his back and cardio-pulmonary resuscitation (CPR) was commenced. Shortly afterwards a further club member arrived from the clubhouse and climbed on board to assist the firefighter. They took it in turns to administer chest compressions and rescue breaths. After 10-15 minutes, the firefighter felt dizzy and developed a headache. The club member conducting CPR noticed the colour draining from the firefighter’s face and asked him if he was okay. The firefighter said he was fine and continued with CPR. As the firefighter’s condition appeared to worsen the other club member conducting CPR asked for the firefighter to be helped out of the boat, which was duly carried out by one of the small crowd of people now gathered on the pontoon.
3 The paramedics arrived shortly afterwards and were initially directed to attend to the firefighter. After examining him, the paramedics quickly removed the cockpit cover and then took over the CPR on Ray. With CPR continuing, Ray was lifted onto the aft seating area and Vasquez was towed round to another pontoon to allow better access ashore. Ray was then transferred to hospital by ambulance. The two club members who had administered CPR were given oxygen and then taken to hospital for further tests and treatment. The firefighter had a carboxyhemoglobin level of 20% when first assessed, while the other club member had a reading of 9.5%; both indicating CO poisoning. Ray did not recover consciousness and was declared deceased at hospital. The postmortem examination recorded that the cause of death was CO poisoning, noting a carboxyhemoglobin level of 51.8%. Vessel owner The owner of Vasquez, Ray Milton, was 72 years old and was a retired lorry driver. He had owned various motor boats throughout his life and had been a member at Cardiff Yacht Club for approximately 20 years. He bought Vasquez from a fellow club member 5-6 years prior to the accident. In common with many recreational boat owners, he neither held formal boating qualifications nor was he required to do so. Vessel description Vasquez was a Draco 2400ST motor cruiser constructed in 1985/86 in Norway. The design was certified by Det Norske Veritas in compliance with Nordic Requirements, a Norwegian boat construction standard. It was certified to carry up to 1400kg including a maximum of 10 persons. The vessel had a forepeak cabin with seating area, dedicated sleeping berth and toilet compartment. The cockpit, which could be enclosed with a canopy, contained the helm position (Figure 2) as well as a small galley and further seating. The engine compartment was situated under the floor of the cockpit at the aft end. The boat was driven by an inboard V6 Volvo Penta AQ225F petrol engine that was naturally aspirated (Figure 3). The vessel was fitted with an OMC stern drive (Figure 4), which provided the boat’s propulsion. It was not possible to determine if the stern drive was original or had been fitted later in the boat’s life. The engine had a wet-exhaust system, whereby cooling water, which was sucked in via ports in the stern drive, was combined with the engine exhaust gas and expelled from the stern drive through the hub of the propeller. Figure 2: Cockpit with view forward into the cabin
4 Situated in the engine compartment were the boat’s batteries as well as three bilge pumps. One bilge pump, which was positioned under the engine, was electrically driven and was operated by holding down a switch at the helm position, while the other two were hand pumps. There was a drain hole at the base of the engine compartment forward bulkhead that allowed water to flow freely through the bilge. Although a switch on the helm console was labelled ‘blower’, no blower was found in the engine compartment. Whether it had been fitted in the past and removed or had never been fitted is unknown. The blower, if fitted, would have normally been used to clear the engine bay of any combustible fumes prior to starting the engine. Figure 3: Volvo Penta AQ225F petrol engine Figure 4: OMC stern drive
5 Use of Vasquez Since buying Vasquez the owner had not used it frequently for trips, although he had visited the boat to check it and to start the engine periodically while at its mooring. During his ownership one major piece of work, costing over £1000, was undertaken on the engine by a local marine professional. However, it is believed that no regular servicing had been undertaken during the last 5-6 years. The owner used the boat very little in the 2-3 years prior to the accident and had discussed selling the boat with friends. However, in the months before the accident, following a trip on a friend’s boat to Portishead, the owner had taken a renewed interest in Vasquez and, a couple of months prior to the accident, had taken a trip around the bay. During the trip, the engine temperature had run very high, so after returning to the yacht club the boat was lifted out of the water. The cooling water inlets on the stern drive were found blocked. The stern drive was cleaned off and re-antifouled, and the oil in the stern drive was changed. Some 4-5 weeks before the accident Vasquez was taken on another test run and the over-heating problem had not re-occurred. However, the engine had not run smoothly at high revolutions and it was clear that it would need further attention before the boat could be used reliably outside Cardiff Bay. Engine testing and inspection Following the fatal accident, the MAIB conducted a reconstruction. The boat’s engine was started with the cockpit floor in place and the canopy erected, but with the aft starboard zip open. Atmosphere monitors and a domestic CO detector were positioned inside the canopy and viewed through the clear plastic of the canopy. After 40 minutes with the engine running, a CO reading of 250ppm2 was recorded on the atmosphere monitor at the helm position. The engine was then switched off, and over the next 5 minutes the CO level increased to 550ppm, before starting to slowly decrease. The local Volvo agent was then contracted to conduct an inspection of the engine and to establish the source of the CO leak. With the engine stopped and the boat afloat, a small water leak was apparent emanating from the rubber bellows on the wet- exhaust system. With the engine running, a considerable amount of exhaust fumes and water were emitted from the port and starboard bellows (Figure 5). 2 ppm - parts per million: HSE workplace exposure limits for CO - long term exposure limit 30ppm (8hrs), short term exposure limit 200ppm (15 minutes). Figure 5: Exhaust leak from rubber bellows
6 On closer examination, it was apparent that the exhaust system was not in accordance with manufacturer’s drawings and had been modified during the life of Vasquez. The following were observed: •• The exhaust manifolds were not original (Figure 6). •• The exhaust risers were not original (Figure 7). •• The cow horn castings had been cut down (Figure 7). •• The exhaust elbow had been connected on both sides of the engine with two unequal rubber bellows and a stepped aluminium tube retained by stainless steel hose clips (Figure 7). Although it could not be confirmed, the lack of corrosion on the bolts attaching the risers to the exhaust manifold suggested that the exhaust system had been included in the work carried out in the last 3-4 years. Figure 6: Drawing of original exhaust manifolds
7 Carbon monoxide hazard and legislation CO is produced by incomplete combustion. Potential sources include propulsion engines, generators, paraffin and oil lamps, log burners and barbecues. CO is a highly poisonous gas that weighs the same as air. It cannot be seen, smelled, tasted or felt. When breathed in, CO readily replaces oxygen in the human bloodstream by forming carboxyhemoglobin. This prevents oxygen from supplying the heart, brain and other vital organs. Common symptoms of low exposure to CO poisoning include headache, feeling sick, stomach pain, difficulty breathing, or feeling tired or confused. In greater concentrations a person will feel drowsy and lethargic, and may have difficulty walking and moving around. CO poisoning is not a problem limited to recreational craft and can also be an issue in the home. CO detectors/alarms of varying types are widely available and will provide an early warning of the presence of the poisonous gas. Many detectors have an audible and visual alarm, which operate when a certain Figure 7: Exhaust riser and rubber bellows Hose clips Rubber bellows Stepped aluminium tube Cow horn Exhaust riser
8 level of exposure to CO has been reached. However, they are dependent on having a power supply, often in the form of a small battery. Legislation has been introduced requiring CO detectors/alarms to be fitted: since 2010 in some new dwellings; since 2011 in new caravans; and since 2015 in rented properties. CO detectors/alarms, although widely recommended by organisations such as the Gas Safe Charity, CoGDEM3 and Boat Safety Scheme (BSS)4, are not required to be fitted under any UK regulations on board recreational craft. The Recreational Craft Directive (RCD), introduced in 1998, also has no provision for CO monitors, but does require inboard engines to be fitted in an enclosure separated from living quarters and installed to minimise the hazard from toxic fumes. However, these requirements would not have applied to Vasquez given that its construction predated the introduction of the RCD. There is no specific legislation that applies to the maintenance of recreational craft that operate in coastal regions. However, those operating on inland waterways have to satisfy the requirements of the BSS. Similar accidents In April 2014 two fatalities occurred on the motor cruiser Arniston5. The owner had fitted a portable generator in the boat’s engine compartment and rigged an exhaust system to discharge combustion gases overboard. The exhaust system failed during use while the vessel was moored, resulting in the exhaust fumes filling the motor cruiser’s cabin and leading to the death of two of the occupants. They had not been alerted to the presence of CO because the alarms fitted on board were not working. In June 2016 a further two fatalities resulted from CO poisoning on the motor cruiser Love for Lydia6. The petrol-driven inboard engine had been left running while alongside, probably to charge batteries. The exhaust from the engine filled the cockpit canopy and spread into the cabin. There was no CO detector/alarm fitted on board and the occupants were overcome by the fumes. The MAIB made recommendations to: the Maritime and Coastguard Agency regarding the co-ordination of raising CO awareness of the leisure boating community; British Marine to seek clarification on carbon monoxide requirements within the RCD; and the BSS regarding the compulsory installation of CO monitors in craft participating in the BSS scheme. ANALYSIS Accident scenario Ray Milton died from CO poisoning because his boat’s engine exhaust system was leaking the odourless gas into the cockpit and cabin area of his boat. With no CO detector/alarm fitted to his boat, he was unaware of the gas’s increasing presence. Over a period of time, with little ventilation to disperse the gas, a sufficient concentration of CO built up, such that he was overcome by the gas and collapsed in the cabin. The first responder on scene was also unaware of the presence of CO, and commenced CPR on Ray in the cabin not realising the danger he was placing himself in or that he would be breathing further CO into Ray’s lungs during CPR. The MAIB’s reconstruction demonstrated that, although the first responder had switched off the engine, the CO levels increased significantly in the following few minutes, making the situation worse. This was probably because, with the engine running, it was drawing in some of the atmosphere from the cockpit. With the engine switched off this effect was removed. 3 CoGDEM - The Council of Gas Detection and Environmental Monitoring. 4 Boat Safety Scheme - This scheme’s purpose is to help minimise the risk of boat fires, explosions, or pollution harming users of inland waterways. 5 www.gov.uk/maib-reports/carbon-monoxide-poisoning-on-motor-cruiser-arniston-with-loss-of-2-lives 6 www.gov.uk/maib-reports/carbon-monoxide-poisoning-on-board-the-motor-cruiser-love-for-lydia-with-the-loss-of-2-lives
9 CO awareness Department of Health statistics from 2013 show that around 40 people in the UK are killed by accidental CO poisoning each year. At least a further 4,000 people are treated in hospital for non-fatal CO poisoning. The number of further individuals who might have suffered from CO poisoning and not visited hospital as they have assumed some other illness is responsible (given the common symptoms) is impossible to quantify. However, it is apparent that awareness of the dangers of CO is not widespread in the UK as a whole, and this equally applies to those involved with recreational craft. In 2015, the All-Party Parliamentary Carbon Monoxide Group published a report, entitled ‘Carbon Monoxide: From Awareness to Action’, which highlighted many issues regarding CO safety, including the difficulties of raising CO awareness. Within the context of recreational boaters, several organisations, notably the BSS, CoGDEM and the Royal Yachting Association (RYA), have been proactive in raising awareness of the dangers posed by CO, and the BSS ‘Trusted Messenger’ initiative, which started in April 2017, has the potential to significantly improve CO safety on inland waterways. However, a significant task remains to raise CO awareness among the users of coastal recreational craft. It is welcome news that co-ordination of the task to raise awareness is underway following the MAIB’s Love for Lydia report’s recommendation. CO detectors/alarms and ventilation For those recreational craft not registered for use on inland waterways, such as Vasquez and numerous others operating around the UK coast, there is no requirement to fit a CO detector/alarm. CO is often regarded as a product of poor combustion and, therefore, poorly maintained equipment. However, as demonstrated in the Love for Lydia accident, a properly maintained engine can still emit significant quantities of CO from its exhaust. Simply mooring near a motor boat with its engine running could expose the crew to CO. A suitable CO detector/alarm is the only effective way to be warned of the presence of the gas. Once warned of the presence of the gas, steps can be taken to reduce its concentration by removing the source and by increasing ventilation. Unfortunately, when trying to keep warm while inside a recreational craft, the natural tendency is to try to limit draughts. This will only help with the build up of CO and is further justification for fitting a CO detector/alarm. There is a common misconception that CO detectors/alarms used in the marine environment are prone to false alarms. This is rarely the case. If the alarm sounds it will be because CO is present. The alarm must sound at relatively low concentrations of CO to provide enough warning for effective remedial action to be taken. CO detectors/alarms intended for recreational craft are tested to a rigorous standard (EN 50291-2), which should reassure boat owners that when a CO alarm sounds, suitable action must be taken. Recreational craft maintenance Although new recreational craft have to meet the requirements of the RCD, once purchased there is no requirement for ongoing maintenance of a private leisure vessel. In addition, for private recreational craft operating around the UK coast, there is no requirement to regularly have the safety of the vessel checked. There is, therefore, a significant onus on a boat owner to ensure their boat is maintained properly and that it remains safe to operate.
10 Although the full maintenance history of Vasquez’s engine could not be determined, it was apparent that the exhaust system had been modified and two rubber bellows added to the wet-exhaust pipework. Rubber bellows on a wet-exhaust system are vital in maintaining the watertight integrity of a boat and it is advisable to inspect them regularly and replace them every 2-3 years, as the rubber can harden and deteriorate. In this case, in addition to the rubber bellows being older than 3 years, the trial trip during which the engine overheated probably damaged the rubber. This ultimately led to a water/exhaust fumes leak, which caused Vasquez’s cabin to slowly flood and CO gas to enter the engine compartment while the engine was running. The RYA offers courses and provides guidance on various aspects of boating to educate boat owners on how to stay safe when afloat. It is important, however, to appreciate the extent of one’s knowledge when it comes to self-maintenance of a boat, particularly with regard to its engine, and when professional advice should be sought. Regular engine servicing in accordance with the engine manufacturer’s guidelines should ensure an engine remains reliable and safe to use. CONCLUSIONS •• Ray Milton died from CO poisoning because, without a CO detector/alarm being fitted to his boat, he was unaware that CO from his boat’s engine exhaust was emitting into the cockpit and cabin area. •• Given the recent fatal accidents from CO poisoning on recreational craft, there remains a significant task for the various stakeholders of the industry to assist in raising CO awareness. •• Given CO’s odourless nature, the fitting of a CO detector/alarm remains the only effective warning against being poisoned by the gas. •• CO detectors/alarms intended for recreational craft are tested to a rigorous standard, which should reassure boat owners that when a CO alarm sounds, suitable action needs to be taken immediately. •• It is important to seek professional advice and regularly service a boat’s engine, in accordance with the manufacturer’s guidelines, to ensure it remains reliable and safe to use.
11 ACTION TAKEN MAIB actions The Marine Accident Investigation Branch has: •• Issued a Safety Bulletin7, in August 2016, following the two fatalities on the motor cruiser Love for Lydia, highlighting the dangers of CO poisoning and the need for detectors. RECOMMENDATIONS Given the recommendations issued following the MAIB’s recent Love for Lydia investigation, no further recommendations are made. 7 www.gov.uk/maib-reports/safety-warning-after-carbon-monoxide-poisoning-on-motor-cruiser-results-in-loss-of-2-lives
12 SHIP PARTICULARS Vessel’s name Vasquez Flag Not applicable Classification society Not applicable IMO number/fishing numbers Not applicable Type Draco 2400ST motor cruiser Registered owner Privately owned Manager(s) Not applicable Construction Glass reinforced plastic Year of build 1985/86 Length overall 7.75m Gross tonnage Not applicable Minimum safe manning Not applicable Authorised cargo Not applicable VOYAGE PARTICULARS Port of departure Cardiff Port of arrival Cardiff Type of voyage Moored Cargo information Not applicable Manning 1 MARINE CASUALTY INFORMATION Date and time 12 November 2016, approximately 1200 Type of marine casualty or incident Very Serious Marine Casualty Location of incident Cardiff Yacht Club marina Place on board Cockpit Injuries/fatalities 1 fatality Damage/environmental impact None Ship operation Moored Voyage segment In port External & internal environment No breeze, dry day Persons on board 1
FD06042 | 2012_英国_catastrophic-engine-failure-and-fire-on-board-ro-ro-passenger-ferry-wight-sky__MAIBInvRepo.pdf
分类:06_境外及港澳台调查报告 | 年份:2012 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
M A R I N E A C C I D E N T I N V E S T I G AT I O N B R A N C H SERIOUS MARINE CASUALTY REPORT NO 14/2018 JULY 2018 1 Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an such investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2018 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. All reports can be found on our website: www.gov.uk/maib For all enquiries: Email: maib@dft.gov.uk Tel: 023 8039 5500 Fax: 023 8023 2459 ACCIDENT REPORT Catastrophic engine failure, resulting in a fire and serious injuries to the engineer on board Wight Sky, off Yarmouth 12 September 2017 SUMMARY At 2133 on 12 September 2017, while approaching Yarmouth, Isle of Wight, the ro-ro passenger ferry Wight Sky (Figure 1) suffered a catastrophic failure of one of its main propulsion engines, followed by a fire. The fire was brought under control in less than 2 minutes, but the vessel’s engineer, who had been standing near the engine, suffered serious burn injuries to his hands and face. Although he was discharged from hospital 7 days later, he was subsequently diagnosed with post- traumatic stress disorder. An examination conducted by the vessel’s engine maker, Volvo Penta UK, concluded that the most probable trigger for the failure was debris in the engine’s oil channels following rebuild. The MAIB investigation established the following: •• The engine had been completely rebuilt and failed after 5½ hours of operation. •• The vessel’s soft patches 1 had not been removed, necessitating the engine to be lowered piecemeal into the engine room. 1 Soft patches: steel plates bolted down and sealed flush with the vehicle deck, that can be removed to allow large pieces of ship’s machinery or equipment to be removed/inserted. Figure 1: Wight Sky
2 •• Debris could have entered the engine’s oil channels during the 3 days that the partially assembled engine had been exposed to the elements. •• Analysis of oil samples from the engine indicated that accelerated wear had commenced before the engine failure. •• The power supply to the essential services switchboard, which distributed power to critical equipment including the fixed fire-extinguishing system, was lost 27 minutes after the accident. Actions have been taken by the vessel’s owner, Wightlink Limited, and by Volvo Penta UK, to address some of the issues identified in this report. A recommendation has been made to Volvo Penta UK, to consider offering wear particle detection technology for marine engines that cannot be easily serviced on board. FACTUAL INFORMATION Narrative On 12 September 2017, the ro-ro passenger ferry Wight Sky departed Lymington at 2100 2 for the 40-minute passage to Yarmouth. There were 40 persons on board. Main propulsion engine 2 (ME2) had been put back into service following a complete rebuild by Volvo Penta authorised service engineers RK Marine Limited (RKM). The crew of the morning shift had tested ME2 off load and had verified that all alarms and shutdowns were functioning correctly. During the afternoon shift, the vessel’s engineer tested the engine on load, and on departure from Lymington that evening all four main engines were sharing the sea load. At around 2130, the engineer went down to the forward engine room from the machinery monitoring room (MMR), located on the main vehicle deck immediately above, to note the machinery running parameters for the logbook. He saw that the high temperature cooling water header tank for ME2 required topping up and, while he was filling the tank with coolant, he heard an unusually loud sound from the engine. The mechanic was attending to main propulsion engine 1 (ME1) located in the same space (Figure 2a). At 2133:51, as the engineer rushed towards ME2’s emergency shutdown button, there was a loud explosion from its crankcase (Figure 2b). The engineer, who was wearing a full sleeved cotton boiler suit, was momentarily engulfed in a ball of fire and experienced intense pain. He ran out of the engine room and, assisted by the mechanic, went to the 2 All times are UTC. Mechanic Engineer Figure 2a: CCTV footage before engine explosion (CCTV time was 13 minutes slower than alarm system time) ME1 ME2
3 MMR. They called the bridge using the talk back system and apprised the master of the situation. At the time, the master was making his approach to the ferry terminal, which was approximately 300m away. The bosun was at the wheel. The master abandoned berthing, and at 2135 released the Hi-fog 3 fire suppression system for the forward engine room. The master observed on the closed-circuit television (CCTV) screen that the fire appeared to be extinguished less than a minute after the Hi-fog had been activated. On the master’s order, the bosun made an announcement to inform the passengers of the incident and to reassure them that the situation was under control. The master then called the emergency services and asked for ambulance and fire services to attend the vessel at the berth. Wight Sky berthed at 2142 and all passengers and vehicles were disembarked in an orderly fashion. Meanwhile the ship’s crew attempted to make the engineer comfortable. Shortly after berthing, an ambulance with paramedics arrived on board Wight Sky and, after assessing the engineer, took him to the hospital. The fire brigade arrived at approximately 2200. When firefighters entered the engine room a few minutes later, the Hi-fog system had stopped. On inspecting the engine room, the firefighters found a small fire still burning inside ME2’s crankcase. They extinguished this with a portable dry powder extinguisher. On the afternoon of 13 September, Wight Sky was towed to Portsmouth for repairs. The damaged engine was replaced with a new one and the vessel was returned to service on 26 October. The engineer suffered burns to his hands and face. Although he was discharged from hospital after 7 days, he was subsequently diagnosed with post-traumatic stress disorder. He had not returned to work at the time of publishing this report. Sequence of events and damage observed The following sequence of events was captured by the vessel’s Kongsberg alarm recording and CCTV systems: •• 2133:08 ME2 lube oil pressure shutdown •• 2133:10 ME2 crankcase pressure; coolant level; common shutdown •• 2133:51 Explosion (CCTV footage) •• 2134:25 Fire alarm •• 2134:59 Hi-fog activated •• 2135:58 Fire apparently extinguished (CCTV footage) •• 2202:29 Hi-fog pump unit fault 3 Hi-fog: Marioff Hi-fog System, a water mist-based fire suppression system. Figure 2b: CCTV footage showing engine explosion
4 Most of the visible damage was observed in and around cylinder unit 4 of ME2. The big end bearing was distorted radially (Figure 3a), white metal had melted onto the bearing pin on the crankshaft (Figure 3b) and two of the four big end bearing bolts had sheared at the joining face between the top and bottom halves of the bearing keep. The outboard side of the crankcase was punctured (Figure 3c), creating a large opening through which several components, including the gudgeon pin, connecting rod and fragments of the piston and cylinder liner had been ejected. There was fire damage on and around the engine (Figure 3d). Company and crew Wightlink Limited (Wightlink) operated eight vessels on scheduled routes between the Isle of Wight and the south coast of England. Three sister vessels, Wight Sky, Wight Light and Wight Sun operated on the Lymington-Yarmouth route. The other vessels in the fleet, including two high speed vessels, operated on routes from Portsmouth to the Isle of Wight. On the day of the accident Wight Sky’s crew comprised the master, mate, bosun, three deck ratings, an engineer and a mechanic. The master and engineer held STCW 4 certificates of competency appropriate to their ranks. The master had 7 years’ experience and the engineer 26 years’ experience in their respective roles on board Wightlink ferries. Layout of machinery space and engine maintenance Wight Sky had a Voith-Schneider cycloidal propulsion unit at each end of the vessel. Each propeller shaft was belt-driven by a pair of Volvo Penta D16C-A MH, six-cylinder engines, with an output of 485kW per engine at 1800rpm
- ME1 and ME2 were located in the forward engine room and ME3 and ME4 in the
aft engine room. The Hi-fog fire-extinguishing system with its tanks, pumps and release switches was located in the space between the two engine rooms (Figure 4). There was an agreement between the vessel’s classification society, Lloyd’s Register, Wightlink and their service agents, RKM 6 that the Volvo Penta engines on all three sister vessels would be completely stripped down and examined every 16000 to 20000 hours. RKM had carried out 16 engine rebuilds on the three sister vessels, including that of ME2 of Wight Sky. The assembly of the engine’s block complete with liners, pistons, connecting rods, bearings and crankshaft, but without the cylinder head or sump pan was referred to as the ‘short block’. In all 16 instances, the short blocks were built in RKM’s workshop and were delivered to the vessels’ engine rooms via the emergency escape hatch. The water and oil channels, internal components and machined surfaces were protected by a loose plastic sheet during transit and while waiting to be lowered into the engine room. Openings to engine room Each engine room had a 0.69m by 0.69m emergency escape hatch on the starboard side leading to the vehicle deck above. The aperture of the hatch was restricted by a handrail and ladder. The short block was the largest engine assembly that could be moved through the hatch opening. All of Wight Sky’s four main propulsion engines had a ‘soft patch’ in the deckhead directly above them that could be removed to permit the removal and replacement of complete engines (Figure 5). Each opening was 3.85m by 1.95m and was closed with a steel plate bolted down and sealed flush with the vehicle deck. At the deckhead level in the engine room, the soft patch was insulated and covered over with cladding plates held in place by pop rivets. Opening the soft patch involved the removal of several items associated with the engine, including a large section of exhaust pipe, crankcase breather, engine lifting beam and several brackets supporting the pipes. 4 STCW - International Convention on Standards of Training, Certification and Watchkeeping for Seafarers 1978, as amended. 5 rpm: revolutions per minute. 6 The company carried out all the major servicing of Volvo Penta engines in the Wightlink fleet.
5 Figure 3: Damage to main engine 2 3a - Distorted big end bearing cylinder unit 4 3b - Bearing pin of cylinder unit 4 3c - hole in engine crankcase 3d
6 Figure 4: General arrangement of machinery spaces Watertight doors Hi-fog system Forward machinery space Aft machinery space Main engine 1 Main engine 2 Clutch Coupling Belt drive Voith Schneider propulsion Output shaft Belts
7 0.69m 0.69m 3.85m 1.95m Figure 5: Soft patch and escape hatch
8 Wightlink and RKM had agreed to move the engine in and out of the engine room using the emergency escape hatches. In October 2017, the replacement ME2 was lowered into the engine room through the soft patch opening. It took external contractors 8 hours to remove the soft patch and 16 hours to refit it. Previous engine failure on Wight Sky In July 2017, ME2 developed a coolant loss problem. The ship’s crew and RKM were unable to diagnose the cause of this. Several cooled components, including the turbocharger and associated exhaust piping, were replaced, but the problem persisted. On 4 August, the cylinder head was replaced by RKM, but on testing the engine thick white smoke was observed at the engine exhaust. On 11 August, the turbocharger was replaced, when the engine was run up one of the two exhaust valves on cylinder unit 5 sheared, resulting in the lower half becoming embedded in the piston. The failure was not investigated but was attributed by RKM to incorrectly adjusted valve tappet clearances. Engine rebuild Following the failure of ME2 on 11 August, RKM, with the agreement of Wightlink, decided to complete a full rebuild of the engine. The work commenced on August 18 at RKM’s workshop. The engine components used for the rebuild were a mixture of new and used components from other D16 engines in the fleet. The crankshaft was polished and crack tested at a specialist workshop subcontracted by RKM. The crankshaft oil channels were blown through with compressed air before assembly. The engine block was pressure washed, dried and a rust inhibitor applied to its internal surfaces. The short bock was assembled using the polished crankshaft and new pistons, cylinder liners and bearing shells. The short block and the remaining components of the engine were transported to Lymington ferry terminal on Friday, 25 August. There is conflicting evidence as to whether it was delivered on board and left on deck or remained on the quay. On 29 August, the Tuesday following the August bank holiday, the short block, cylinder head and sump pan were lowered separately into the forward engine room via the emergency escape hatch by Wightlink staff. Between 29 August and 4 September, two diesel fitters from RKM completed the engine rebuild in Wight Sky’s engine room. At the time, they were unable to assemble the coupling connecting the engine to the output shaft as the thread of one of the coupling’s bolt holes was damaged. On 4 September, RKM tested the engine uncoupled from the output shaft and left the vessel with instructions to the vessel’s engineer to load test the engine once it had been connected to the output shaft. Engine lubrication system The lubrication system (Figure 6) consisted of a crankshaft-driven oil pump, which delivered the sump oil through two full flow filters of 40-micron mesh size and a third, part-flow filter of 10-micron mesh size. The total quantity of lubricating oil was 55 litres. An oil channel along the inboard side of the engine block conveyed the lubricating oil to the main bearings. From the main bearing the oil was fed to the big end bearing immediately forward of it through a drilled channel. Piston cooling and lubrication oil was carried through a separate channel on the outboard side of the block.
9 Examination of the engine Prior to the explosion, ME2 had been run for 5½ hours since its rebuild. On 19 September, the engine cylinder block, sump pan, clutch and external pipes of ME2 were removed by RKM in the presence of MAIB inspectors. The engine short block, with all the remaining components, was packed and delivered to temporary storage on 4 October and to Volvo Penta’s UK head office at Warwick on 9 November. On 15 November, specialist engineers from Volvo Penta, Sweden, examined the engine components in the presence of representatives of the MAIB, RKM and Wightlink. The tightening torque of the bolts on bearing keeps of all the undamaged main and big end bearings was checked and confirmed to be correct. The crankshaft journal dimensions were also checked to establish that they were true. Signs of overheating at main bearing 5 at the top end of its journal nearest to big end bearing 4 were observed. Upon dismantling main bearing 5, its shells were found to have turned (Figure 7). Both the bearing shells and journal had suffered severe damage, but there was no remaining evidence of debris embedded in the bearing shells. The investigation report by Volvo Penta concluded that, when the shells for main bearing 5 turned, they blocked the lubricating oil channel on the main journal leading from the journal to cylinder unit 4’s crank pin. This caused the big end bearing to seize on the crank pin, leading to the failure of the bearing bolts. The rotating crankshaft then hit the unrestrained connecting rod, which impacted against the side of the crankcase, puncturing it and breaking the piston cooling oil gallery. The report concluded: We believe the breakdown was occurred due to remaining debris in the engine oil channels and the main bearing 5 after the overhaul. And also considering that the breakdown occurred only 5 hrs. after the refurbishment. [sic] Part-flow filters of 10-micron mesh size Full-flow filters of 40-micron mesh size Lubricating oil to main journal crank pin and gudgeon pin Oil pump suction Oil in sump Piston cooling oil nozzle Figure 6: Engine lubricating oil system Forward filter Crankshaft driven oil pump Centre filter
10 Connecting rod Bearing shell Big end bearing Gudgeon pin Piston Crankpin Drilled oil passage Main journal Turned bearing shell Figure 7: Schematic of crankshaft assembly
11 Tests carried out The forward and centre filter (Figure 6), along with oil samples from forward filter housing and the engine sump were analysed independently for their physical and chemical characteristics and accumulated wear particles. The report on the analysis of particles in the filters stated: Both of the oil filters tested contained high quantities of particulate matter...Some particles exhibited evidence of localised heating. Some of the particles observed were rather large (over 1mm in size). A few critical parameters are compared in Table 1. Oil from sump Oil from forward filter Iron (ppm7) 17 8 Copper (ppm) 27 27 Lead (ppm) 18 13 PQ Index8 8 217 Water (ppm) 2472 279 Flash point - indication of fuel dilution (°C) 135
200
Table 1: Comparison of test results of engine lubricating oil samples To understand the 7mode of failure of the big end bearing bolts of cylinder unit 4, they were also independently tested. 8The test report concluded that all bolts failed by ductile failure (either in tension or shear). The report further observed that the two bolts on one side of the bearing keep had failed in tension, and the two on the other side in shear. Essential services switchboard The forward and aft engine rooms had their own main switchboards. A common essential services (ES) switchboard was connected to each main switchboard by a dedicated circuit breaker. The ES switchboard supplied electrical power to critical equipment such as the water-mist fire suppression system 9 (Hi-fog), watertight doors, rescue boat davit, main hydraulic power pack and emergency lighting. The ES circuit breakers had an automatic and manual mode and were intended to be left in automatic mode so that irrespective of which main switchboard was in use, the critical equipment was not deprived of electrical power. On the day of the accident, the forward switchboard was in use. It shut down just after 2200 after the electrical power supply automatically switched over to the aft switchboard. As a result of an earlier oversight, the ES circuit breaker for the aft switchboard had been left in the manual mode, so the ES switchboard was left without power. This caused the loss of all essential services, including the Hi-fog system. 7 ppm: parts per million 8 PQ Index: A relative measurement of the total ferrous metal content of oil detected by magnetic field. 9 The Hi-fog system had a reserve tank of water pressurised by nitrogen, sufficient to provide up to 60 seconds of coverage for the protected space.
12 Previous accidents and failures In February 2018, D16 main propulsion engine on Wight Light shut down on low oil pressure. The analysis of the sump oil from the engine indicated a large amount of copper, lead and iron wear particles. Subsequent strip down examination of the engine by RKM, found that the main bearing shells of cylinder unit 2 had turned. On 7 September 2017, the 15.87m crew transfer vessel, Windcat 8, was on passage to Grimsby, UK, from the Lynn Wind Farm in the North Sea with two crew and eight windfarm technicians on board. Shortly after setting off, the vessel’s port engine, which was the same make and model as that on Wight Sky, suffered catastrophic damage and caught fire. The MAIB investigation 10 identified that one of the engine’s connecting rod big end shell bearings had failed, resulting in the connecting rod assembly releasing and penetrating the engine crankcase. In November 2015, Wight Sun suffered a failure of its D16 main propulsion engine. The cause of failure was established to be turned shells of a main bearing. ANALYSIS Immediate consequences of the accident Wight Sky was approaching the ferry terminal at Yarmouth when ME2 exploded, causing a fire in the engine room and injuring the engineer. The master was faced with a very difficult situation and, in co-ordination with the bosun, executed a series of quick actions that ensured the safety of the vessel, passengers and crew. The engineer was extremely fortunate that his injuries were not life threatening. The shrapnel ejected from the engine during the explosion thankfully missed him and, despite being engulfed in fire, his cotton boiler suit protected most of his body from the heat. The consequences of this accident could have been far worse. Accident mechanism All the bolts from undamaged bearings had been torqued to the recommended levels, and metallurgical tests on the failed big end bearing bolts established that there was no evidence of fatigue. The engine ran for 5½ hours before the breakdown; had the engine been incorrectly assembled it is likely that the failure would have occurred soon after it had been started. Volvo Penta’s finding, that debris in the oil channels was the likely cause of the bearing shells turning, was not supported by direct evidence, such as embedded debris in the shells. However, debris of significant hardness and size, if lodged between the main bearing and crankshaft journal, has the potential to disrupt the hydrodynamic lubrication, resulting in metal to metal contact. This would be rapidly followed by the bearing shells turning, blocking the oil supply to the big end bearing, which then resulted in its failure. Soft patches The soft patches were not used to move the engines in or out of the engine rooms due to the disruption their removal would cause. Therefore, RKM planned its work around the use of the emergency hatch. This required the engines to be partially disassembled and rebuilt in the engine room, transporting the majority of the components in the short block. 10 MAIB Report 1/2018, catastrophic engine failure, resulting in a fire on board Windcat 8 off the Lincolnshire coast.
13 The source of any debris that might have entered the oil channels cannot be known for certain. However, ME2’s short block had been exposed to the elements for 3 days with only a loose plastic sheet for protection, and debris could have entered the oil channels during this time. Rebuilding the entire engine under a clean and controlled environment and transferring it directly into the engine room through the soft patch would have significantly reduced the likelihood of debris ingress during transit and while awaiting fitting. Analysis of test results The test results of the sump oil sample revealed high levels of water and fuel contamination that were not present in the oil sample from the filter. Since the mechanically-driven lubricating oil pump would have stopped with the engine, the filter oil sample was representative of the engine oil’s condition before the explosion. The contamination of the sump oil was a result of the damage and subsequent fire suppression. The presence of a high number of particles larger than 10 microns as indicated by a high PQ index (Table 1), combined with a low count of small iron particles in the oil sample from the forward filter, suggests a sudden and rapidly progressing wear-down. The unusually large wear particles in the filters, some of which were larger than 1mm, also implies that accelerated wear had started before developing into a catastrophic failure. This wear-down probably started before the main bearing shells turned, since the total starvation of oil supply would have resulted in nearly instant seizing of the big end bearing, giving insufficient time for the wear particles to find their way to the filter. Therefore, the wear particles exhibiting heat damage were most likely to have been from main bearing 5, generated before the bearing shells turned. It is evident from the alarm logs that the lubricating pressure shutdown was activated a few seconds before the explosion. By that time, the damage had already been done. As the engine was not fitted with a particle detector or other means of detecting rapidly progressing wear, there was no possibility of receiving an early warning before the engine failed. The previous accident on Windcat 8 and other failures on sister vessels of Wight Sky could also have potentially been prevented had a particle detector system been fitted. Loss of power to essential services When the power supply for Wight Sky switched from the forward to aft switchboard, the ES switchboard lost all power because the dedicated ES circuit breaker had been left in the manual mode. As a result, the Hi-fog system, along with the watertight doors and several other pieces of critical equipment, lost electrical power. The Hi-fog system was very effective in extinguishing the fire within a minute of having been activated. However, had the changeover to the aft switchboard taken place immediately after the accident, the Hi-fog system would have provided further protection for only 60 seconds, increasing the potential for re-ignition and growth of the fire. There were several fuelled vehicles parked on the deck directly above the forward machinery space, so the consequences of the loss of electrical power to the ES switchboard could have been very serious. To avoid the loss of power to critical equipment, the importance of the ES switchboard circuit breakers needs to be recognised and suitable controls established to ensure these are not routinely left in the manual mode.
14 CONCLUSIONS •• The consequences of this accident could have been far worse; the engineer was fortunate that his injuries were not life threatening, and the quick actions of the bridge team ensured the safety of the vessel, passengers and crew. •• Volvo Penta’s investigation into the engine failure concluded that: ○ ○Debris in the engine’s oil channels was most probably responsible for initiating the failure. ○ ○When the shells of main bearing 5 turned, the lubrication supply to big end bearing 4 was blocked, resulting in destructive failure. •• Rebuilding the engine in a clean and controlled environment and transferring it complete into the engine room would have reduced the likelihood of debris ingress. •• The engine was not fitted with a wear detector, so there was no means of receiving a warning before the engine failed. •• The essential services switchboard aft circuit breaker had been left in manual mode, resulting in the loss of power to critical equipment, including the fixed fire-fighting system. ACTION TAKEN Wightlink Limited has: •• Agreed with RKM that all engines will be fully assembled and load-tested prior to delivery on board. •• Put in place signage to ensure that the circuit breakers for the essential services switchboard are correctly set at all times. Volvo Penta UK has: •• Written to all Volvo Penta dealerships in the UK and Ireland to provide guidance on good practice for repair and rebuild and to ensure that: ○ ○Volvo Penta UK is informed of any major engine failure resulting in injury, fire or flood. ○ ○Where appropriate, soft patches are removed to allow removal and reinstallation of complete engines. ○ ○Engine assembly is completed in a clean environment to prevent debris being built into an engine. ○ ○Following rebuilds, engines are load-tested on a dynamometer and certificates issued confirming the required performance. ○ ○Records of component measurements are kept to confirm that they are within tolerance and fit for reuse.
15 RECOMMENDATIONS Volvo Group (UK) Ltd is recommended to: 2018/120 Consider offering wear particle detection technology for Volvo Penta marine engines that cannot be easily serviced on board. Safety recommendations shall in no case create a presumption of blame or liability
16 SHIP PARTICULARS Vessel’s name Wight Sky Flag United Kingdom Classification society Lloyd’s Register IMO number/fishing numbers 9446984 Type Ro-ro passenger ferry Registered owner Wightlink Limited Manager(s) Wightlink Limited Year of build 2008 Construction Steel Length overall 62.40m Gross tonnage 2546 Minimum safe manning 10 Authorised cargo Passengers, private and commercial vehicles VOYAGE PARTICULARS Port of departure Lymington Port of arrival Yarmouth (Isle of Wight) Type of voyage Internal waters Cargo information 19 motor vehicles, 30 passengers Manning 10 MARINE CASUALTY INFORMATION Date and time 12 September 2017, 2133 Type of marine casualty or incident Serious Marine Casualty Location of incident 50°42’.41 N, 1°30’.03 W (300m from Yarmouth ferry terminal) Place on board Forward engine room Injuries Severe burn injuries to engineer Damage/environmental impact Main propulsion engine 2 damaged beyond repair Ship operation In service Voyage segment Arrival External & internal environment Moderate sea, light breeze Persons on board 40
FD06043 | 2012_英国_catastrophic-engine-failure-and-subsequent-fire-on-board-the-site-investigation-vessel-kom.pdf
分类:06_境外及港澳台调查报告 | 年份:2012 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
SERIOUS MARINE CASUALTY REPORT NO 10/2026 MAY 2026 1 Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an such investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2026 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. All reports can be found on our website: www.gov.uk/maib For all enquiries: Email: maib@dft.gov.uk Tel: +44 (0)23 8039 5500 ACCIDENT REPORT ACCIDENT REPORT Catastrophic engine failure and subsequent fire on board the site investigation vessel Kommandor Susan in the Firth of Forth, Scotland on 25 January 2025 SUMMARY At 1305 on 25 January 2025, the site investigation vessel Kommandor Susan suffered a catastrophic failure of a diesel generator engine while conducting sea trials in the Firth of Forth, Scotland. The failure resulted in an engine room fire and a complete power blackout. The crew responded promptly, extinguished the fire and mustered safely. The vessel lost propulsion and began drifting eastwards. Attempts to deploy anchors were unsuccessful because the anchor winches required electrical power to operate. Kommandor Susan was eventually returned to Leith harbour with limited propulsion restored. The investigation found that the engine failure was caused by premature wear of bearings fitted during a major overhaul in 2019. These components were not approved by the engine original equipment manufacturer and exhibited weaker material bonding than genuine parts. The extended service intervals applied to the engines were valid only for original equipment manufacturer components, making the use of substitute parts a critical factor in the failure. The vessel’s former owner had minimal oversight of the overhaul process and assumed that original equipment manufacturer parts were used. This lack of verification meant that the presence of substitute components remained undiscovered and was not communicated to subsequent owners. Additionally, the vessel’s anchoring procedure did not account for the risk of power loss, leaving the anchors inoperable during the emergency. The vessel’s owner, Gardline Shipping Limited, has since rebuilt the affected engine, and overhauled all other generator engines on board Kommandor Susan, with original equipment manufacturer parts. The Chief Inspector of Marine Accidents has written to the vessel’s previous owner, Hays Ships Limited, outlining the importance of a structured supervision system that provides clear accountability measures and the need to adopt real-time progress monitoring for all critical maintenance activities. Kommandor Susan Image courtesy of fabianv (ShipSpotting.com)
2 FACTUAL INFORMATION Narrative On the morning of 25 January 2025, the crew of Kommandor Susan prepared the vessel for sea trials from the Port of Leith, Scotland. At 1020, the chief engineer (C/E) started diesel generator (DG) 1 and DG4 to warm the engines. By 1142, a pilot had boarded, and the bridge team had completed their pre-departure checks. At 1220, Kommandor Susan entered the lock to exit Leith harbour, clearing the lock at 1252 before proceeding into the main channel of the Firth of Forth. At 1305, the C/E heard a change in engine tone from one of the running DGs, followed immediately by a loud bang and the activation of the fire alarm. On opening the engine control room (ECR) door, the C/E observed that the engine room was filled with smoke and oil mist. One minute later, the C/E informed the bridge that there was a fire in the engine room. In response to the incident, the second engineer (2/E) stopped both DGs from the ECR switchboard, resulting in a blackout and loss of propulsion. The emergency generator started automatically and restored power to essential systems, including emergency lighting, but not to propulsion. The master sounded the general alarm from the bridge, prompting the crew to muster stations. Once everyone was accounted for, the chief officer (C/O) prepared a fire team to enter the engine room. Equipped with a dry powder extinguisher, the fire team located and extinguished several small pockets of burning oil in the bilges on both sides of DG1 before exiting the space. With no propulsion available, Kommandor Susan began drifting eastwards. The master instructed the deck crew to drop anchor to arrest the drift, but both anchor winches were clutched into their respective electric motors and the clutches could not be released due to the lack of power. The pilot advised the master that support had been requested and, at 1416, the tug Kittiwake was made fast to Kommandor Susan’s port quarter. Shortly after, the C/E advised that DG4 could be safely restarted. Limited propulsion was restored once DG4 was operational, which allowed Kommandor Susan to manoeuvre, and anchor winch clutches could also be released at this time. Kommandor Susan berthed alongside at 1806, having returned to Leith harbour assisted by two tugs. Environmental conditions On 25 January 2025, the weather in the Firth of Forth was mostly dry with a south-westerly force 5 to force 6 wind. The visibility was good and the ebbing tide was running at around 2 knots to the east. Kommandor Susan Kommandor Susan was built in 1999 as an 83m offshore supply vessel. In 2018, the vessel was sold to Hays Ships Limited (Hays Ships). In 2022, Kommandor Susan was sold to Gardline Shipping Limited (Gardline). In 2019, significant works had been undertaken to convert the vessel to work in the specialist site investigations sector. Site investigation vessels performed offshore geotechnical and geophysical surveys.
3 Kommandor Susan’s propulsion system comprised four Caterpillar 3516B-TA diesel generators (Figure 1), each with a rated output of 1,901 kilowatts (kW). This system was used to power two 2,200kW azimuth propulsion units, an 883kW drop-down azimuth thruster and an 800kW tunnel bow thruster. Kommandor Susan’s crew were all appropriately qualified to serve on a UK registered vessel. Regular fire drills were completed on board to prepare the crew to deal with emergency situations. This included the use of portable extinguishers, fire hoses, and breathing apparatus. The emergency response teams also practised raising the alarm, isolating fuel and ventilation systems, and deploying fixed firefighting installations such as carbon dioxide or water mist systems. Communication protocols were tested to maintain coordination between the engine room, bridge, and emergency response teams. Drills also emphasised evacuation routes, muster points, and casualty handling. Diesel generators The standard service intervals for Caterpillar 3516B-TA engines were based on load, operating environment and fuel quality. For marine applications using Ultra Low Sulphur Diesel, Caterpillar’s recommended service intervals were 5,000 hours for a top-end service and 10,000 hours for a major overhaul. The top-end service included cylinder head removal and inspection. The major overhaul included the removal of components such as pistons, liners and bearings as well as the replacement of all bearings, pistons and piston rings. Connecting rods could also be replaced at this time based on their condition. The service interval could be extended with Caterpillar’s agreement following the first major overhaul. Several factors were considered in Caterpillar’s decision to approve an increase, including total fuel usage, oil analysis, historic power loading and the condition of the parts removed during the major overhaul. Caterpillar had extended the service intervals on Kommandor Susan’s 3516B-TA engines to 24,000 hours, which was not an uncommon decision for similarly loaded engines if genuine Caterpillar components were used in subsequent overhauls. Major overhaul service intervals could be extended up to 40,000 hours. At the time of the accident DG1 had operated for 65,700 hours in total, of which 13,466 running hours were since the 2019 overhaul. The previous four oil analysis reports for DG1 did not show any significant amounts of wear particles. The most recent of these was based on an oil sample taken on 6 January 2025, some 19 days and 127 running hours before the failure. All four of Kommandor Susan’s DGs underwent major overhauls during Hays Ships’ ownership: DG1 and DG3’s overhauls were completed in January 2019; DG2 and DG4’s overhauls were Looking down onto four large pieces of machinery in the vessel’s engine room. In the foreground is DG1, which is fire damaged and has a red and white hazard tape cordon at one end. Figure 1: Kommandor Susan's four diesel generators DG1
4 completed in November 2020. All four overhauls were carried out by Holderness Ship Repairers Limited (Holderness)1, which sourced many of the major components required for the engine overhauls from G&T Engineering Limited2. Hays Ships’ technical management was made aware that some of the component parts for the engine overhauls would be sourced from the USA, but Holderness did not provide specific supplier details or certification. During the 2019 major overhaul of the engines, Hays Ships’ technical management simultaneously oversaw Kommandor Susan’s conversion with several major engineering projects demanding their attention. Post-accident inspection of DG1 It was observed, post-failure, that DG1’s cylinder 5 and cylinder 6 pistons had fractured and released their connecting rods from the piston gudgeon pins and the big ends had detached from the crankshaft. The loose connecting rods had punched through their respective sides of the crankcase (Figure 2). The cylinder 5 and cylinder 6 pistons remained in their cylinder liners. The remains of the small end and big end bearings were found in the crankcase; all were found in a high state of degradation and were heat affected. Other detached parts included crankshaft counterweights and lower sections of the pistons, and both gudgeon pins were found in the crankcase. 1 Holderness Ship Repairers Limited ceased trading in November 2024. 2 G&T Engineering Limited ceased trading in February 2023. Figure 2: Damage to DG1 View of scorched and fire-damaged machinery, highlighting DG1’s crankcase on the right-hand side. Looking towards a hole DG1’s crankcase, exposing the fire-damaged internal machinery.Several detached component parts. Damaged parts DG1 crankcase Images courtesy of MAIB and Kommandor Susan 2/E
5 The failed DG1 was removed from Kommandor Susan and transported to a Caterpillar authorised agent, Pon Power, in Papendrecht, the Netherlands. Pon Power technicians stripped the engine into its component parts for detailed inspection. The technicians found that many of the major components of the rotating assembly were not original equipment manufacturer (OEM) parts. The non-OEM parts identified in DG1 were manufactured by Costex Tractor Parts (CTP). The USA-based CTP stated on its website that it provided New Replacement Parts for Caterpillar. CTP was not listed as an authorised dealer on Caterpillar’s official dealer locator. The DG1 components identified as CTP parts included pistons, connecting rods, small end and big end bearings, and main bearings. The Pon Power technicians compared a CTP big end bearing found in DG1 and a genuine OEM big end bearing and identified that the white metal surface of the OEM big end bearing had an aluminium backing layer, while the white metal surface of the CTP big end bearing had a copper backing layer (Figure 3). Pon Power produced a report on its findings that stated the most likely order of events to be: • Run out of connecting rod bearing five • Bearing hammered thin • Connecting rod cap number five breaks at a normal stress raiser • Connecting rod number five damages counterweight five and bottom of liner five and six • Counterweight five comes loose and falls into the oil pan • Piston number 6 gets stuck due to the damaged liner • Connecting rod bolts break by overload and connecting rod cap number six comes off. Pon Power’s report concluded that: With the facts gathered the most likely root cause is failure of connecting rod bearing number five. The excessive wear on the other connecting rod bearings show that the most likely root cause for the bearing failure is weak bonding of the copper layer. Evidence of weak material bonding was found in several bearings (Figure 4). Figure 3: Comparison between genuine OEM (left) and CTP bottom end bearings (right) Image courtesy of Pon PowerTwo curved pieces of metal placed side by side. There is a copper tint to the edge of the bearing on the right-hand side.
6 The report made two recommendations: • Make use of original Caterpillar parts as service interval schedules are only applicable for these parts. Non-Caterpillar parts used in the engine tent to have a shorter service life. [sic] • Check the use of non-Caterpillar bearings in the other engines on the vessel. If so, plan a early change of the main and connecting rod bearings. [sic] Parts approval process The approval process for a ship’s engine parts involved several steps to ensure compliance with safety and performance standards. Classification societies required manufacturers to submit detailed documentation, including their manufacturing process descriptions, quality control measures, and test results. Typically, there were four steps:
- Application submission – manufacturers to provide technical specifications, factory layout
drawings, and quality control procedures.
- Testing and inspection – classification societies to conduct inspections and tests to verify
compliance with industry standards.
- Certification and approval – issued if the parts met the required standards.
- Regular renewal and compliance checks – to ensure continued regulatory compliance.
The investigation found no evidence that CTP manufactured parts had been class approved by any marine classification societies. Three separate bearings, each overlaid with an illustrated circular outline highlighting exposed copper beneath its white metal surface. Image courtesy of Pon Power Figure 4: Evidence of weak material bonding on several bottom end bearings
7 REGULATION AND GUIDANCE Emissions of nitrogen oxides (NOx) from marine diesel engines were regulated under the International Convention for the Prevention of Pollution from Ships (MARPOL Convention)3 Annex VI4, Regulation 13, which applied to all engines over 130kW. Compliance was achieved through certification under the NOx Technical Code5 2008 and required an Engine International Air Pollution Prevention (EIAPP) certificate and ongoing in-service verification. This verification was usually in the form of a NOx file that recorded all NOx-emitting components and documented post-maintenance and post-overhaul updates. The NOx limits were defined within a set of tiered emission standards based on the ship’s construction date and engine speed, with the earliest compliance applicable to vessels constructed on or after 1 January 2000. Kommandor Susan was built in 1999, so was not required to comply with the MARPOL Convention Annex VI, Regulation 13 on NOx limits. This meant that no NOx file existed, which would have tracked compliant components and spare parts. Previous accidents At 2003 on 16 April 2018, the Lithuania registered roll-on/roll-off (ro-ro) cargo vessel Finlandia Seaways suffered a catastrophic main engine failure that caused serious structural damage to the engine and a fire in the engine room (MAIB report 2/20216). The vessel’s third engineer suffered serious smoke-related lung, kidney and eye injuries during their escape. The investigation identified that non-OEM maintenance techniques introduced latent defects, which led to engine failure. At 2013 on 19 September 2021, a fire broke out in the auxiliary engine room on the Finland registered ro-ro cargo ship Finnmaster during departure from Hull, England (MAIB report 13/20257). Finnmaster lost power, but the fire was later extinguished and the vessel safely re-berthed with the assistance of tugs. The auxiliary engine room was significantly damaged, but there were no injuries. The flexible hose installed in the fuel system during a modification did not meet the required standard, was fitted in an inappropriate position, and had not been subject to approval or oversight by the responsible classification society. ANALYSIS Overview The catastrophic engine failure fire on board Kommandor Susan occurred when DG1 suffered a mechanical breakdown, leading to a fire in the engine room and a complete blackout. Emergency response procedures were followed, all crew were accounted for, and the fire was successfully extinguished. However, the vessel lost propulsion and drifted until limited propulsion was restored and tug assistance arrived. Kommandor Susan eventually returned to Leith harbour. 3 The MARPOL Convention was adopted on 2 November 1973 at the International Maritime Organization. 4 Prevention of Air Pollution from Ships (entered into force 19 May 2005). 5 Technical Code on Control of Emission of Nitrogen Oxides from Marine Diesel Engines. 6 MAIB report 2/2021: Finlandia Seaways 7 MAIB report 13/2025: Finnmaster
8 Engineering oversight Hays Ships had overseen major engine overhauls during its ownership of Kommandor Susan. The company expected that Holderness would use genuine Caterpillar parts for these overhauls based on a long-standing relationship and mutual trust. Coupled with competing priorities during the vessel’s conversion project, this resulted in Hays Ships providing minimal oversight to Holderness and no verification of authenticity for the parts used, enabling the installation of non- OEM components that later contributed to the engine failure. Similar to the lack of oversight highlighted in both the Finlandia Seaways and Finnmaster cases, the lack of structured supervision and verification during Kommandor Susan’s main engine overhaul process meant that Hays Ships was unaware that non-OEM parts had been used. This oversight created a latent risk that was not communicated to Gardline when it later purchased the vessel. Since no NOx file was required for Kommandor Susan and Hays Ships was not directly supervising the work, there was no control of the suitability of parts used in the vessel’s engine overhauls. The failure to implement robust contractor assurance measures allowed critical safety vulnerabilities to persist undetected, ultimately leading to DG1’s catastrophic failure. Bearing failure Post-failure inspection revealed that non-OEM bearings manufactured by CTP were fitted during the overhaul. These bearings had a copper backing layer instead of the aluminium layer found in genuine Caterpillar bearings; weaker bonding of these layers reduced durability. The extended service interval agreed by Caterpillar was approved on the basis that genuine parts were used. The CTP parts were designed for a standard service interval. Use of the CTP parts beyond their design life led the connecting rod bearings to fail, initiating a chain of mechanical failures that culminated in the engine failure and subsequent fire. The extended service intervals were inappropriate for these substitute components, accelerating the risk of failure. Anchoring The crew attempted to deploy the anchors to arrest the vessel’s drift when propulsion was lost. However, both anchors were clutched into their electric motors and could not be released without power. Industry good practice is to have anchors cleared away and ready to drop when navigating in pilotage conditions, and any procedural oversight posed a significant safety hazard during emergencies involving total power loss. The inability to anchor increased Kommandor Susan’s vulnerability to environmental conditions, grounding and collision risks until tug assistance arrived. CONCLUSIONS • The catastrophic failure of Kommandor Susan’s DG1 engine and resultant engine room fire was caused by the premature wear of non-OEM components, fitted without Hays Ships’ knowledge during the engine’s last major overhaul. • The agreed extended service intervals were inappropriate when non-OEM components were in use, accelerating the risk of failure. • Hays Ships exercised limited oversight of the contractors performing the engine overhauls. The company was therefore unaware that non-OEM parts had been used, and unable to adequately determine the risk of failure or inform the vessel’s new owner that non-OEM parts were fitted in the engines.
9 • The failure to implement robust contractor assurance measures allowed critical safety vulnerabilities to persist undetected, ultimately leading to the catastrophic engine failure. • The inability to anchor increased Kommandor Susan’s vulnerability to environmental conditions, grounding and collision risks until tug assistance arrived. Kommandor Susan’s onboard procedure for emergency anchoring did not identify the risk of having the winch drum permanently clutched in. ACTIONS TAKEN MAIB actions The Chief Inspector of Marine Accidents has written to Hays Ships Limited, outlining the importance of robust oversight during critical maintenance activities and the need to adopt a system of structured supervision, ensuring clear accountability and real-time progress monitoring. Actions taken by other organisations Gardline Shipping Limited has: • Rebuilt DG1 with genuine spares, including a new engine block; • Completed major overhauls of DG2, DG3 and DG4 using genuine Caterpillar parts; • Changed the onboard anchoring procedure, highlighting that clutches must remain disengaged when the winches are not in use to ensure they remain ready for use in the event of power failure. RECOMMENDATIONS In view of the actions already taken, no recommendations have been made.
10 SHIP PARTICULARS Vessel’s name Kommandor Susan Flag UK Classification society Det Norske Veritas IMO number/fishing numbers 9177844 Type Site investigation vessel Registered owner Gardline Shipping Limited Manager(s) Gardline Shipping Limited Year of build 1999 Construction Steel Length overall 83.7m Registered length 75.36m Gross tonnage 3,388 Minimum safe manning 10 Authorised cargo Not applicable VOYAGE PARTICULARS Port of departure Leith, Scotland Port of arrival Leith, Scotland Type of voyage Sea trial Cargo information Not applicable Manning 14 MARINE CASUALTY INFORMATION Date and time 25 January 2025 at 1305 Type of marine casualty or incident Serious Marine Casualty Location of incident The Firth of Forth, Scotland Place on board Engine room Injuries/fatalities None Damage/environmental impact Substantial damage to diesel generator Ship operation Sea trials Voyage segment Departure External & internal environment Wind south-westerly force 5 to force 6; mostly dry; good visibility Persons on board 14
FD06044 | 2012_英国_catastrophic-engine-failure-resulting-in-a-fire-on-crew-transfer-vessel-windcat-8__MAIBInv.pdf
分类:06_境外及港澳台调查报告 | 年份:2012 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
M A R I N E A C C I D E N T I N V E S T I G AT I O N B R A N C H SERIOUS MARINE CASUALTY REPORT NO 1/2018 FEBRUARY 2018 1 Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an such investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2018 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. All reports can be found on our website: www.gov.uk/maib For all enquiries: Email: maib@dft.gsi.gov.uk Tel: 023 8039 5500 Fax: 023 8023 2459 ACCIDENT REPORT Catastrophic engine failure, resulting in a fire on board Windcat 8 off the Lincolnshire coast 7 September 2017 SUMMARY On 7 September 2017, the 15.87m crew transfer vessel, Windcat 8, was on passage to Grimsby, UK, from the Lynn Wind Farm in the North Sea with two crew and eight windfarm technicians on board. Shortly after setting off, the vessel’s port engine suffered catastrophic damage and caught fire. The passengers were quickly transferred on to Windcat 31 and the fire was contained within the port engine space and soon extinguished. Windcat 8’s port engine was badly damaged and the vessel was towed to Grimsby by Windcat 30. There was no pollution and no injuries. The MAIB investigation identified that the catastrophic damage to Windcat 8’s port main engine was caused by the failure of a piston connecting rod big end shell bearing, which resulted in the connecting rod assembly releasing and penetrating through the engine crankcase. The investigation also identified that: •• A high oil temperature alarm prior to the engine failure warranted a more cautious approach to the use of the engine until a deeper technical investigation could be conducted. •• The fire resulted from the ignition of oil vapour released from the damaged crankcase and did not spread beyond the port engine. •• The fixed fire extinguishing system was rendered ineffective because not all the port engine space vents were closed prior to its release. •• The safety of the passengers was given a high priority. A recommendation has been made to Windcat 8’s owner, Windcat Workboats BV Ltd, which is aimed at improving its crews’ reactions to engine alarms and engine space fires. Windcat 8 Image courtesy of Windcat Workboats BV Ltd
2 NARRATIVE At approximately 16201 on 7 September 2017, the crew transfer vessel2 Windcat 8, owned and operated by Windcat Workboats BV Ltd (Windcat Workboats), departed wind turbine LN09 on the Lynn Wind Farm (Figure 1) to return eight technicians to Grimsby, UK. The vessel’s crew comprised a master and a deckhand. It was daylight with a gentle breeze and slight seas. As Windcat 8 cleared the windfarm, the master increased the vessel’s speed to 21 knots (approximately 1840rpm). At 1638, a high engine oil temperature alarm activated on the port engine indication panel on the forward console in the main cabin (Figure 2). The master immediately set both engines to idle and told the deckhand to go to the port engine space to investigate. The deckhand checked the port engine’s cooling system and oil level but he did not identify anything unusual. He returned to the cabin, closing the port engine space deck hatch behind him (Figure 3), and reported his findings to the master. As the high oil temperature alarm on the indication panel had now reset, the master decided to resume passage. At 1640, he increased the vessel’s speed back to 21 knots and monitored the port engine temperature, which remained normal. 1 All times are UTC(+1) 2 Crew transfer vessels are used to provide support services to offshore windfarms Figure 1: Extract of Admiralty Chart 1190-0 showing accident location Reproduced from Admiralty Chart 1190-0 by permission of HMSO and the UK Hydrographic Office Grimsby Windcat 8's track 1620 1646 (Fire) Lynn Wind Farm Inner Dowsing Wind Farm
3 Figure 3: Aft deck Exhaust vent Supply vent Natural vent Port engine space deck hatch Figure 2: Deck plan and lay out Fire extinguishing system activation panel Engine space access Forward console Natural vent Fuel shut off
4 At 1646, there was a loud bang in the port engine space, the port engine stopped, and the port engine space fire alarm activated. The master saw from the closed-circuit television (CCTV) monitor that the port engine was alight (Figure 4a)3. In response, he stopped the starboard engine, shouted that there was a fire, instructed the deckhand to close down the port engine space and activate its fire extinguishing system. He also stopped the ventilation fans servicing the port engine space and told the eight technicians to prepare for evacuation. The deckhand went onto the aft deck and closed the flap on the port engine space supply vent. He then activated the port engine space’s fire extinguishing system using controls located on the cabin’s aft bulkhead, behind the last row of seats (Figure 2). By 1648, the port engine space was filled with the extinguishing medium, which obscured the fire on the CCTV monitor (Figure 4b) and a white gaseous cloud billowed from the port engine space’s natural air vent on the aft deck (Figure 4c) and into the cabin through its open door. The technicians left the cabin and mustered on the foredeck. At 1649, the master broadcast a “Mayday” using the fixed very high frequency radio on channel 16. Windcat 30 and Windcat 31, also owned and operated by Windcat Workboats, were nearby and closed to assist. At approximately 1650, the deckhand supervised the transfer of the technicians from Windcat 8 to Windcat 31. He then returned to the aft deck, where plumes of dark smoke were now coming from the port engine space’s natural vent and entering the cabin through its open door. He leaned through the smoke and operated the remote fuel shut- off for the port engine sited next to the vent (Figure 4d). The master then sealed the natural and exhaust vents. 3 The times shown on the CCTV recordings were 7 minutes slow Figure 4a: Initial fire Figure 4b: Port engine space immediately following the operation of the fixed fire extinguishing system Figure 4c: Fire extinguishing powder billowing from the natural air vent Figure 4d: Deck hand shutting off fuel supply
5 By 1653, the smoke had cleared from the port engine space and flames were observed burning along the top of the port engine (Figure 5a). Four minutes later the port engine was again obscured by smoke. Meanwhile, the master and the deckhand rigged a fire hose on the aft deck in readiness for boundary cooling. The remote fuel shut-off for the starboard engine was also operated. At 1700, the fire appeared to be out and Windcat 8 was taken in tow by Windcat 30 for passage to Grimsby. The master referred to the vessel’s emergency checklists and later re-started the starboard engine to expedite the transit. The vessels arrived at Grimsby Fish Dock at 2100 and were met by local fire and rescue services personnel, who confirmed that the fire in Windcat’s port engine space had been extinguished. Post-incident examination Examinations of Windcat 8’s port engine by Windcat Workboats’ engineers and MAIB inspectors identified that the lower part of the piston, its connecting rod and the piston gudgeon pin from its No.6 cylinder had broken through the crankcase. As a result, the engine-mounted fuel pump had sheared off and the fuel pump casing was fractured. Plastic shielding on the top of the engine had been completely consumed by the fire and the plastic coolant water header tank mounted on the top of the engine, along with conduit and wiring on the side of the engine, had also burned (Figure 5b). Secondary heat damage was limited to a fire detection head and a warning light immediately above the engine. Windcat 8’s port engine, a Volvo Penta D16C-A MH, was removed from the vessel and sent to Haisma Scheeps & Industriemotoren BV (Haisma Scheeps) in the Netherlands for thorough examination. The examination was completed on 21 September, and identified that the big end shell bearing on the No.6 piston connecting rod had been destroyed by heat (Figures 6 and 7). The level of the damage prevented analysis of the bearing to determine the precise cause of its failure. Figure 5a: Fire on engine top Figure 5b: Fire damage to port engine Figure 6: Heat damage to No.6 piston connecting rod Inset: Remains of shell bearing
6 The thorough examination also identified that the camshaft, main bearings and the other connecting rod bearings were in pristine condition and that none of the pistons had seized. In addition, the lubricating oil system appeared to have functioned as expected. Components damaged by the heat generated by the failure of No.6 connecting rod big end bearing included the No.6 crankpin journal (plastic deformation) (Figure 8) and No.6 and No.7 main bearings. Physical damage included: •• The failure of the No.6 connecting rod bearing cap bolts. •• The separation of No.6 piston crown and skirt. The piston crown had struck the open exhaust valve, shattering the ceramic exhaust valve cam follower and damaging the running surface of the exhaust cam lobe. •• A hole in the engine crankcase in way of No.6 piston (Figure 9). Operation Windcat 8, a 15.87m aluminium catamaran, was one of 39 crew transfer vessels operated by Windcat Workboats, mainly in the European offshore wind power generation industry. The vessel was certified under the Brown Code ‘A code of practice for the safety of small workboats and pilot boats under 24 metres’ and was designed and built specifically for transporting up to 12 technicians and their equipment. The catamaran’s square bow enabled the vessel to ‘push on’ to the wind turbines and create a stable platform for the technicians to safely disembark and embark. The vessel typically operated for 12 hours each day, of which 3 hours were spent on passage to and from the wind turbines and the remaining 9 hours were spent on site. It was usual for the vessel to remain ‘pushing on’ to the wind turbine on which the technicians were working. Figure 7: Schematic of crankshaft assembly Piston Gudgeon pin Shell bearing Big end bearing Connecting rod No.6 crankpin journal
7 Propulsion Windcat 8’s propulsion system consisted of twin shaft fixed pitch propellers powered by two Volvo Penta engines via reversing gearboxes. The engines were rated at 551kW at 1900rpm and were sited in separate spaces (port and starboard). Access to the spaces was via hatches on the aft deck (Figures 2 and 3). Remote fuel shut-off mechanisms were sited on the aft deck and were painted red. The port engine was installed in Windcat 8 in July 2015 as part of an engine service exchange contract with Haisma Scheeps, a Volvo Penta accredited service agent. Before installation, the engine had completed 10844 running hours and had been completely stripped down and rebuilt at Haisma Scheeps’ workshops using new components supplied by Volvo Penta. The engine’s oil capacity was 55 litres and its normal operating temperature was 90°C. The high oil temperature alarm was set to activate at 125°C with an intended delay of 30 seconds. Other engine alarms included high exhaust and coolant temperatures and low oil pressure. The engine was not fitted with a protection device to automatically shut it down in the event of defined maximum operating parameters, which could include high oil temperature, being exceeded. From its installation on board Windcat 8, the engine completed 2275 running hours during which the engine was maintained in accordance with Windcat Workboats’ planned maintenance programme, and there had been no reported problems with its operation. In addition, neither the results of the analyses of regular oil sampling, nor the weekly records of the engine’s pressures and temperatures taken when the vessel was either at ‘full speed’ or ‘pushing on’ indicated the presence of any defects or abnormalities. However, the records showed that when ‘pushing on’ at 1300rpm (50% engine speed), the turbocharger exhaust temperatures were higher than when the vessel was on passage and the engines were at their maximum speed of 1900rpm. The engine’s idle speed was approximately 800rpm. Figure 8: Plastic deformation of crankpin Figure 9: Hole in engine crankcase Exit path of connecting rod assembly
8 Engine space ventilation Windcat 8’s engine spaces each had a forced air supply vent, a forced air exhaust vent and a natural air vent. The fans for the supply and exhaust vents were operated by switches on the cabin’s forward console. The supply vent was closed by the movement of a lever that operated an internal flap, and the exhaust and natural vents were closed by sliding plates over their external grills. The operating lever for the supply vent, and the sliding plates, were painted red. The sliding plates were also marked ‘Fire Flap’ (Figure 2). The integrity of the ventilation flaps and sliding plates was tested annually. It was also checked during fire drills. Fixed fire extinguishing system In common with all Windcat Workboats’ vessels, the engine spaces on Windcat 8 were protected by a manually-operated Stat-X fixed fire extinguishing system, supplied and fitted by Marine Fire Safety Limited. The system incorporated a combination of smoke and heat detectors linked to control boxes on the main cabin’s aft bulkhead that also housed the activation mechanism and an audible alarm. The system used a fine particulate agent, potassium carbonate, in aerosol form to extinguish the fire by acting on the chain reaction of the combustion process. To fully suppress flames, the potassium carbonate particles had to be maintained at sufficient density. The system’s operating manual recommended that the engine space doors and hatches remained closed for at least 10 minutes after system activation. Instructions posted adjacent to the Stat-X system’s control boxes advised that the affected space should not be re-entered for at least 15 minutes. Emergency procedures There was no guidance or instructions on board Windcat 8 regarding action to be taken on the activation of engine alarms. Emergency checklists kept on the vessel’s forward cabin console included actions to be taken in the event of abandonment, collision, grounding, man overboard and fire. Regarding an engine space fire, the checklist’s actions included: Shutdown of engines, ventilation Pull fuel shut offs and fit fire flaps and close louvres Activate the engine room smothering system if appropriate Instructions posted adjacent to the Stat-X fire suppression control units stated: In the event of the engine room alarm sounding Switch off engines and machinery Evacuate all personnel from engine room Close all engine room ventilation Carry out fire procedures Crew Windcat 8’s master held an STCW4 accredited Maritime and Coastguard Agency Master’s certificate for coded vessels less than 200 gross tonnes. He had worked for Windcat Workboats for 2 years and had successfully completed a seagoing performance assessment. He had also completed familiarisation training on board Windcat 8 on 5 September 2017 before taking over as master the following day. The deckhand held an STCW navigational watch rating certificate. He had worked for Windcat Workboats for 8 months and had successfully completed a performance assessment at sea. He had also completed familiarisation training on board Windcat 8 when he joined the vessel on 24 May 2017. 4 STCW - International Convention on Standards of Training, Certification and Watchkeeping for Seafarers 1978, as amended.
9 Drills Windcat Workboats required the crews on board its vessels to follow a drills schedule that detailed the types of drill to be conducted and their frequency. It also prescribed the locations of the fire drills with engine room fire drills being scheduled for April and September. Windcat Workboats required the drills to be recorded in each vessel’s deck logbooks on completion. The company also required crews to forward photographs taken during the drills to its UK office. During 2017, the master had completed 16 emergency drills, including fire drills, on board other Windcat vessels and a manoverboard drill on board Windcat 8 during the afternoon of 7 September. The deckhand had completed 23 emergency drills in 2017 including five fire drills. The fire drills did not include any engine space fire drills on board Windcat 8. ANALYSIS Failure mechanism The initial inspection of Windcat 8’s port engine in Grimsby and the later thorough examination of the engine in the Netherlands, showed that the locus of the catastrophic failure was the big end bearing associated with the No.6 piston connecting rod. The condition of the bearing apparently quickly deteriorated soon after Windcat 8 departed from the windfarm. Such a deterioration would have restricted or stopped the flow of oil that was necessary to lubricate the bearing’s moving surfaces. At an engine speed of approximately 1840rpm, the resulting friction between the bearing and the crankpin journal would have generated high temperatures. Initially, the heat would have been conducted through the surrounding oil, but it is evident from the activation of the oil high temperature alarm that the oil temperature eventually exceeded the capacity of the oil cooler and reached 125°C. Following the oil high temperature alarm, the master reduced the port engine’s speed to approximately 800rpm. As a result, the heat generated from the friction between the bearing and the crankpin journal would have reduced. That the high temperature alarm automatically reset, indicates that the oil cooler again lowered the oil temperature to below 125°C. However, as soon as the engine’s speed was again increased to approximately 1840rpm, the big end bearing inevitably would have deteriorated further, heating the surfaces of the crankpin journal and the connecting rod bearing sufficiently to cause plastic deformation of the metal surfaces (Figure 8). Such heat would have also reduced the tensile strength of the bolts holding the connecting rod bearing cap in place. As a result, the bolts failed and the No.6 connecting rod assembly was released at high speed. That the oil high temperature alarm did not activate for a second time was possibly due to the time it would have taken the engine’s 55 litres of oil to again reach 125°C, together with the 30-second delay set. Engine loading It was not possible to pinpoint the cause of the bearing’s failure due to the extensive heat and mechanical damage sustained (Figure 6). However, the engine had been rebuilt in 2015 by an accredited Volvo Penta service agent using new components supplied by Volvo Penta. It had also run for 2270 hours over a period of 26 months, during which its performance had been routinely monitored and found to be within expected parameters. In addition, the thorough examination in the Netherlands did not find other defective parts or defects in the cooling and lubrication systems. Therefore, it is highly unlikely that the failure was the result of incorrect component assembly or a lack of oil. It is more likely that the failure was due to a weakness in the thin-walled shell bearing itself.
10 The likelihood of a relative weakness in the big end bearing leading to its failure was possibly increased by Windcat 8 ‘pushing on’ to wind turbine towers for several hours each day. When ‘pushing on’ the recorded turbocharger exhaust temperatures indicate that the loading on the port engine was higher at 1300rpm than it was at 1900rpm with the vessel on passage. The higher loading when ‘pushing on’ would have resulted in more fuel being injected and an increase in the force acting on the pistons, bearings and crankpin journals. In such circumstances, any weakness or defect in the bearing’s assembly would have been more vulnerable to failure than usual. Engine alarms Automatic engine shutdown arrangements are a technical means of preventing engine damage, but they are not required to be fitted to vessels certified under the Brown Code. However, no guidance or instructions were provided on board Windcat 8 that specified the actions to be taken in response to the differing engine alarms. Therefore, the vessel’s master had to rely on his experience and knowledge to decide on appropriate responses. On this occasion, when the port engine high oil temperature alarm activated, the master immediately reduced the engine’s speed to idle and instructed the deckhand to investigate. As the engine’s cooling and lubrication systems appeared to be working normally and the alarm had reset, the master then resumed passage at 21 knots. At the time, this action was logical and well-intended. However, in hindsight, that the alarm remained unexplained and the engine was not protected by an automatic shutdown arrangement, a more cautious approach in the use of the engine would have been appropriate before it was again put under load. Emergency response The transfer of the eight windfarm technicians from Windcat 8 to Windcat 31 within 5 minutes of the fire in the port engine space being detected indicated that the master gave high priority to their safety. However, the closing down and isolation of the port engine space lacked co-ordination. Although the ventilation fans were stopped, all the ventilation flaps were closed, the Stat-X system was released and the fuel shut-offs were activated, the sequence in which the actions were taken rendered the release of the Stat-X fixed fire extinguishing system ineffective. When the No.6 piston connecting rod assembly penetrated the engine crankcase, oil vapour and intense heat would have released simultaneously, and it is evident that the oil vapour ignited (Figure 4a). Within seconds, the deckhand had activated the Stat-X system in the port engine space and its effect was immediate (Figure 4b). However, it was also short-lived because much of the potassium carbonate quickly escaped through the space’s natural and exhaust vents that remained open (Figure 4c). Consequently, the density of the potassium carbonate was not maintained for sufficient time for it to act on the combustion process, and the fire continued to burn on the engine’s side and top, consuming residual fuel from the fractured oil pump, wiring looms, plastic conduit and shielding, and the plastic coolant header tank (Figures 5a and 5b). The fire extinguished at about 1700, largely because there was little else in its vicinity to burn and the air supply into the port engine space had been restricted by the eventual closure of all the ventilation flaps. Although all the vents were closed within about 2 minutes, this action was almost certainly prompted by the smoke being emitted and entering the cabin, rather than a recognition of the need to maintain the density of the Stat-X aerosol within the engine space. Windcat 8’s master and deckhand had worked on board Windcat Workboat vessels fitted with the Stat-X system for 2 years and 8 months respectively and both had participated in fire drills. In addition, the release procedure for the Stat-X system was straightforward and was posted adjacent to the system’s control boxes and included in the onboard checklists. The vent flaps were also clearly marked. Therefore, notwithstanding the increased stress levels experienced by the master and the deckhand during the emergency, the sequence of their actions indicates that a greater focus on the Stat-X system release procedure is warranted during onboard training.
11 CONCLUSIONS •• The damage to the port engine was caused by the failure of a piston connecting rod big end shell bearing, which led to the connecting rod assembly releasing and penetrating through the engine crankcase. •• A high oil temperature alarm prior to the engine failure warranted a more cautious approach to the use of the engine until a deeper technical investigation could be conducted. •• The fire resulted from the ignition of oil vapour released from the damaged crankcase and did not spread beyond the port engine. •• The fixed fire-fighting system was rendered ineffective because not all the port engine space vents were closed prior to its release. •• The safety of the embarked technicians was given a high priority. ACTION TAKEN Windcat Workboats BV Ltd has: •• Instructed crews on board vessels fitted with Volvo Penta D16 engines to stop the affected engine when a high oil temperature alarm activates, and not to restart the engine until the reason for the alarm has been determined. •• Identified lessons to be learned from the accident and emergency response that will be highlighted in future crew training. •• Programmed additional fire drills on board its vessels. •• Ensured that signage on board its vessels reminds crew to close vent systems before activating engine space fire suppression systems. RECOMMENDATIONS Windcat Workboats BV Ltd is recommended to: 2018/101 Provide training and guidance on the action to be taken for all critical propulsion alarms, and to introduce measures to ensure its crews understand the principles of the installed fixed fire-fighting systems and are fully familiar with procedures for their operation. Safety recommendations shall in no case create a presumption of blame or liability
12 SHIP PARTICULARS Vessel’s name Windcat 8 Flag United Kingdom Classification society Not applicable IMO number/fishing numbers 913358 Type Crew transfer vessel Registered owner Windcat Workboats BV Ltd Manager(s) Windcat Workboats BV Ltd Year of build 2007 Construction Aluminium Length overall 15.87m Registered length 15.87m Gross tonnage 26.20 Minimum safe manning 2 Authorised cargo 12 passengers VOYAGE PARTICULARS Port of departure Grimsby Port of arrival Grimsby Type of voyage Coastal Cargo information 8 passengers Manning 2 MARINE CASUALTY INFORMATION Date and time 7 September 2017 16:39 Type of marine casualty or incident Serious Marine Casualty Location of incident 53° 16.5N 000° 23.1E 4.5nm north-north-west of the Inner Dowsing Wind Farm Place on board Port engine space Injuries/fatalities None Damage/environmental impact Significant damage to port engine Ship operation On passage Voyage segment Mid-water External & internal environment Daylight; Wind force 3; Sea state 3 Persons on board 10
FD06045 | 2012_英国_fire-on-board-fishing-trawler-ardent-ii-resulting-in-extensive-damage__MAIBInvReport12_201.pdf
分类:06_境外及港澳台调查报告 | 年份:2012 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
M A R I N E A C C I D E N T I N V E S T I G AT I O N B R A N C H VERY SERIOUS MARINE CASUALTY REPORT NO 12/2017 JUNE 2017 1 Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an such investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2017 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. All reports can be found on our website: www.gov.uk/maib For all enquiries: Email: maib@dft.gsi.gov.uk Tel: 023 8039 5500 Fax: 023 8023 2459 ACCIDENT REPORT Fire on board fishing vessel Ardent II (INS 127) while alongside in Port Henry Basin, Peterhead 16 August 2016 SUMMARY At approximately 0500 on 16 August 20161, while Ardent II was alongside in Peterhead, an electrical fire started in the crew mess room. A short while later one of the crew got out of bed to go to the toilet, smelt and saw smoke, and raised the alarm. All three crew who were on board managed to escape onto the quay before the fire took hold. The fire service tackled the blaze, finally extinguishing it the following day. The vessel was extensively damaged and was later declared a constructive total loss. The MAIB investigation identified that: •• An electrical fault or failure of a multi-socket adapter in the crew mess room was the most likely cause of the fire. •• There was no smoke detector fitted in the crew mess room and it was fortunate that one of the crew awoke and discovered the fire at an early stage. This alerted the crew to the fire and enabled them to evacuate the vessel without delay. •• The fact the quay offered the crew a safe haven is likely to have influenced their decision to evacuate the vessel immediately, rather than to attempt to contain and extinguish the fire. 1 All times are UTC+1. Ardent II Courtesy of www.shipspotting.com
2 The MAIB has issued a flyer to the fishing industry highlighting the safety issues identified in this report, and endorsing the practice of regular visual inspection and Portable Appliance Testing (PAT) of electrical equipment as an effective means for reducing the risk of electrical fires. More explicit instruction on which spaces on board similar fishing vessels require a means of fire detection is intended to become mandatory in 2017. No recommendations are made in this report. FACTUAL INFORMATION Narrative On 11 August 2016, the trawler Ardent II returned to Peterhead from a fishing trip. The catch was landed, shore power was connected, and the vessel’s machinery was shut down. Four crew went home, leaving three crew, who were Filipino and lived on board. On 15 August, several contractors worked on the vessel conducting weld repairs and servicing the vessel’s fire-fighting appliances. The vessel’s engineer arrived during the morning to oversee the contractors, conduct routine checks, change the compressor’s oil and complete a deep clean of the engine room. The work was in preparation for a pre-guardship duty2 inspection which was scheduled to be carried out later in the week. The contractors completed their work and stood a fire watch over the weld repairs for a further 30 minutes before departing. At approximately 1800, the three crew cooked a meal using an electric rice cooker in the crew mess room and a microwave oven in the galley. During the evening, the engineer briefly ran the port auxiliary engine to enable him to pump out the fish room bilge. At 2200, two crew went to bed. The third crew man went to bed after 2345 having briefly spoken to the engineer, who told him that he would lock up the vessel when he left. At 0230 on 16 August, the engineer finished his work and departed the vessel via the wheelhouse door, noting nothing unusual as he passed through the crew mess room. He locked the wheelhouse door with a padlock as he left. At about 0515, one of the crew exited the accommodation and entered the crew mess room on his way to the toilet/washroom. As he did so, he smelt what he considered to be burning plastic and saw black smoke, but there were no obvious signs of flames or heat. He shouted to alert the other two crew, who then exited the accommodation into the crew mess room, unfastened the watertight door, and passed through the doorway into the aft net drum space and then onto the quay. At the same time, the crewman who had raised the alarm entered the wheelhouse, opened the wheelhouse door window, unlocked the padlock using a key from his pocket, opened the door, and passed onto the aft upper deck and then onto the quay. The three crew then alerted the crew of a nearby fishing boat and they called the fire service at 0537. Ten minutes after the crew had escaped from Ardent II, flames were seen emitting from the watertight doorway between the crew mess room and the aft net drum space. At 0546, the first fire appliance arrived on scene and another two arrived within the next 20 minutes. At 0611, the fire incident commander reported that the vessel was well alight and was moored by the bow only, as the stern lines had burnt through, and he requested a further three fire appliances be sent to the scene. The fire crews tackled the blaze from the quay as they were unable to board the vessel at that time. By 0620, with the vessel’s crew accounted for, arrangements were made to push the vessel back alongside. 2 Guardship duty is when a vessel is contracted to guard an offshore installation such as a pipeline or oil rig.
3 By 1209, the fire on Ardent II was believed to be extinguished. However, flames were later seen in the accommodation and further fire-fighting was necessary (Figure 1). The fire service continued damping down until the following afternoon, at which time there were no further hot spots or signs of smoke. Although still afloat, Ardent II was extensively damaged by the fire and was later declared a constructive total loss. Crew Ardent II’s skipper held a Class 2 Fishing Vessel Certificate of Competency, which he had obtained 18 years prior to the accident. All the crew had either completed the necessary sea survival, first-aid, fire-fighting and safety awareness courses in the UK or, in the case of the Filipino crew, possessed recognised equivalent qualifications. All three Filipino crew had completed at least two contracts on UK fishing vessels, the contracts varying between 8 and 10 months in length. They had also spent a minimum of 6 months on Ardent II, and lived on board the vessel. All the crew were smokers apart from the skipper. Smoking was permitted in the crew mess room, but not in the accommodation. Vessel layout The central living area of Ardent II, situated on the weather deck, housed the galley, crew mess room, the toilet/washroom and a skipper’s cabin (Figure 2). The galley was equipped with an electric cooker, fridge and freezer, microwave oven and kettle. A portable electric hob was available in the galley for use when the vessel was connected to shore power as the electric cooker drew sufficient current to trip the shore connection when other electrical appliances were also in use. The crew mess room provided seating at two tables. It was equipped with a television and a satellite box, located forward of the exhaust trunking, that were usually left on stand-by. There was also a freezer on the starboard side forward of the engine room access hatch. The freezer was plugged into a multi-socket adapter located adjacent to it. Other electrical appliances, including a rice cooker and the crew’s mobile phones, were plugged into the adapter when required. No such appliances were plugged into the adapter at the time of the accident. The accommodation incorporated seven bunks and was fitted with an escape hatch to the aft net drum space on the port side. Normal access to the accommodation was via a vertical ladder from the crew mess room. A separate vertical ladder from the crew mess room gave access to the engine room. The wheelhouse, which incorporated a fire detection and alarm system panel, was accessed from the crew mess room via a stairway with a door fitted at the top. An aft door provided access from the wheelhouse to the aft upper deck. Figure 1: Ardent II on fire on 16 August 2016
4 Wash room Galley Skipper’s cabin Crew mess room Accommodation access hatch Engine room access hatch Accommodation escape hatch Engine room escape trunk Stairs up to wheelhouse Freezer Tables Exhaust trunking Figure 2: Ardent II layout
5 Fire protection, alarms and fire-fighting appliances Fire protection fitted to Ardent II was limited to the galley boundary. The galley was separated from the crew mess room by a fire door, but this was normally secured open, its auto-closure having been disconnected previously (Figure 3). A fire detection and alarm system was fitted to the vessel. The system was connected to smoke and heat detectors in the engine room, a heat detector in the galley and a smoke detector in the accommodation. The fire alarm, which sounded in both the wheelhouse and accommodation, was last tested in May 2016. Eight portable fire extinguishers were positioned throughout the vessel. These included 9-litre water extinguishers in the accommodation and crew mess room, and a 4.5kg dry powder extinguisher in the galley. The engine room was fitted with a CO2 fixed fire-extinguishing system, which could be activated from the aft net drum space. Two electrically driven pumps in the engine room could also be used as fire pumps, which fed fire hoses located on the main deck. A manual fire pump was located inside the main deck shelter. Maintenance, survey and inspection Ardent II was partly-owned by Grampian Sea Fishing Ltd, who provided general vessel management services. This included organising contractors for repairs and servicing, and arranging vessel inspections and surveys. Auto-closure mechanism Figure 3: Galley fire door with auto-closure disconnected
6 The vessel was last surveyed by the Maritime and Coastguard Agency (MCA) on 2 March 2016. On the basis of this survey, an International Fishing Vessel Certificate and a Load Line Exemption Certificate were issued, valid until 28 May 2017 and 2 March 2017 respectively. On 11 May 2016, a pre-guardship duty inspection was conducted by the Scottish Fishermen’s Federation. All identified deficiencies were closed out by 19 May 2016. Regulations and guidance Ardent II was built in 1986 in Campbeltown and was 24.36m registered length. When constructed, the vessel was certified against the requirements of The Fishing Vessels (Safety Provisions) Rules 1975 (1975 Rules), which include specific requirements for vessels under 24.4m registered length. Under the 1975 Rules, neither an automatic fire detection and alarm system nor a fixed fire-extinguishing system for machinery spaces was required for steel vessels of less than 24.4m registered length. However, Ardent II was fitted with a fixed fire-extinguishing system and a fire detection and alarm system for the engine room, which exempted the vessel from the requirement for the divisions separating the engine room from the accommodation, service spaces and control stations to be insulated to the ‘A60 standard’3. In 2005, the MCA published Marine Guidance Note (MGN) 291 (F) - Fire Detection and Alarm Systems on Fishing Vessels, which specified that fishing vessels over 24m registered length should have a fire detection and alarm system protecting the accommodation, service spaces and control stations. In 2008, the fire detection and alarm system on Ardent II was extended by connecting a heat detector in the galley and a smoke detector in the accommodation. As a result of a harmonisation of standards, Ardent II was later required to meet regulations for vessels over 24m registered length, resulting in an International Fishing Vessel Certificate being issued. In 2014, the MCA published MGN 501 (F), announcing a voluntary code of practice for fishing vessels of 24m registered length and over. In respect of fire detection and alarms systems, the Code requires such a system to be: ‘…installed and so arranged as to detect the presence of fire in all accommodation spaces and service spaces except those which afford no substantial fire risk, such as void spaces and sanitary spaces.’ The Code is intended to become mandatory in 2017, replacing, among other legislation, the 1975 Rules. Regulation 14 of The Merchant Shipping and Fishing Vessels (Provision and Use of Work Equipment) Regulations 2006 states: ‘The employer shall ensure that all ship’s electrical equipment and installations are so constructed, installed, operated and maintained that the ship and all workers are protected against electrical hazards.’ Similar accidents In 2008 a fire broke out in the galley/mess area of the fishing vessel Vision II4, while alongside in Fraserburgh. The three crew, who were living on board, all died as a result of the fire. Contributing factors to this accident were the disabling of the fire detection and alarm system and an inability of the galley fire door to self-close. 3 So insulated where necessary with suitable non-combustible materials such that, if the division is exposed to the standard fire test, the average temperature of the unexposed side of the division will rise not more than 139ºC above the initial temperature nor will the temperature at any one point, including any joint, rise more than 180ºC above the initial temperature within 60 minutes. 4 MAIB Report No 8/2009.
7 In 2010, as a result of this and other accidents, the MCA published MGN 413 (F) - Voluntary Code of Practice for Employment of Non European Economic Area (EAA) Fishing Crew, and MGN 425 (M+F) – Assessment of Risks for those sleeping on “Dead Ships”. MGN 413 (F) highlighted the voluntary code that had been produced by the SFF to highlight the social and practical responsibility of employing non- EEA fishing crew. The following extracts are relevant to this accident: •• ‘Do the alarms sound loud and clear in the accommodation and sleeping cabins? Consider fitting supplementary smoke detectors. •• Are fire doors self-closing or kept closed? •• Have heaters and cooking appliances been checked and are they safe to use in the accommodation? •• Are all electric appliances safe, with correct wiring, fuses (e.g. radios, TVs, toasters, kettles, phone chargers etc)?’ The following extracts of MGN 425 (M+F) are also relevant to this accident: •• (3.1) It is recommended that all vessels should have fire (smoke) and bilge alarms fitted with at least two independent power sources. The alarm should be so fitted that it can be heard within the accommodation in areas where crew may be sleeping. •• (3.3) It is strongly recommended that the alarm systems be capable of detecting, not only smoke and high bilge levels but noxious and flammable gases. •• (4.2.6) Are fire doors self-closing or kept closed (Note: unapproved holdbacks should be removed only electromagnetic holdbacks linked to the fire detection system are acceptable)? •• (7.1.10) Are all electric appliances safe, with correct wiring, fuses (e.g. radios, TV’s, toasters, kettles, phone chargers etc.)? ANALYSIS Source of the fire A detailed examination of the fire damage was undertaken to try to establish the source of the fire. The fire patterns and other evidence indicated the likely source of the fire was in the crew mess room. This ruled out it being a potential consequence of welding work carried out the day before the accident. Although the galley area was heavily damaged, the extent to which items had survived in this compartment also eliminated the possibility of the fire having originated there. Given that the crew were smokers and were permitted to smoke in the crew mess room, a discarded cigarette was considered as a possible source of ignition. However, based on the physical post- accident evidence of the scene and the time at which the fire was discovered, a discarded cigarette was considered to be an unlikely source. On excavation of the fire scene (Figure 4), it was apparent that the seat of the fire was at deck level in the gap between the freezer and the seating in the crew mess room (Figure 5). An aluminium plinth edging in this area had melted, there was heavy charring of the wood structure, and remnants of the multi-socket adapter (Figure 6), with the freezer plugged in, were found in the debris. A section of the fridge compressor electric cable was found intact, suggesting that the freezer itself was not the source of the fire. In light of this evidence, it is concluded that an electrical fault or failure of the multi-socket adapter was the most likely cause of the fire.
8 Figure 4: Fire damage to crew mess room Figure 5: Location of source of fire Engine room hatch Freezer Table supports Freezer side
9 Fire detection and alarm system It was fortunate that one of the crew awoke and discovered the fire shortly after it had started. In the absence of a smoke detector in the crew mess room, this alerted the crew to the fire and triggered them to evacuate the vessel without delay. The nearest sensor to the probable source of the fire was a heat detector in the galley, which would not have activated until later, or possibly not at all if the fire door to the galley had been shut. Ardent II’s fire detection and alarm system was initially restricted to the engine room as a means of exempting the engine room from being fitted with ‘A60 standard’ divisions. Efforts were subsequently made to upgrade the vessel’s fire detection and alarm capability but the description in the regulations of areas to be covered allowed the crew mess room to remain excluded. A more explicit instruction on which spaces on board similar fishing vessels require a means of fire detection to be fitted is included in MGN 501 (F), which is intended to become mandatory in 2017 and should address this omission. Action on discovery of the fire The fire quickly spread throughout the vessel. By using available portable fire extinguishers, and closing doors and other openings on discovery of the fire, the crew might have been able to restrict its spread, or even extinguish it, before they evacuated onto the quay. Such actions might then have enabled the fire service to start tackling the fire at an earlier stage in its development and so limit the resulting damage. However, the fact that the quay offered the crew a safe haven is likely to have influenced their decision to evacuate the vessel immediately, rather than to attempt to contain and extinguish the fire. Figure 6: Remnants of multi-socket adapter Remnants of multi-socket adapter Aluminium plinth edge
10 Electrical safety on board While good practice suggests that electrical appliances should be switched off and unplugged when not in use, some appliances, such as freezers and fridges, require a constant power supply. Ashore, the Electricity at Work Regulations 1989 place a responsibility on employers that any electrical equipment that has the potential to cause injury is maintained in a safe condition. The Regulations do not specify what needs to be done, by whom, or how frequently. However, Portable Appliance Testing (PAT) is a common method used by employers to discharge this responsibility. The Merchant Shipping and Fishing Vessels (Provision and Use of Work Equipment) Regulations 2006 place a similar responsibility on employers in relation to electrical equipment on fishing vessels. Regular visual inspection of electrical equipment to check for bare wires, that appropriate fuses are in place, and for signs of burning, together with regular PAT, would provide an effective means for reducing the risk of electrical fires. Living on board fishing vessels The MAIB investigation of the fire on board Vision II highlighted a number of concerns about crew living on board fishing vessels while in port. MGN 413 (F) and MGN 425 (M+F) summarise many of these issues and provide guidance on ensuring crew safety. The practice of crew locking themselves inside a vessel is an understandable measure from a security aspect and, as demonstrated in this accident, is unlikely to hinder their escape provided that they are immediately alerted of the need to do so and have the necessary capacity. However, in other circumstances, the situation could present significant problems for the fire service in both rescuing crew and fighting the fire. The issue of access to a fishing vessel in an emergency is something that owners and operators should take fully into account as part of their risk assessment before allowing crew to live on board in port. CONCLUSIONS •• An electrical fault or failure of a multi-socket adapter in the crew mess room was the most likely cause of the fire. •• There was no smoke detector fitted in the crew mess room and it was fortunate that one of the crew awoke and discovered the fire at an early stage. It enabled the crew to be alerted to the fire and triggered them to evacuate the vessel without delay. •• The fact that the quay offered the crew a safe haven is likely to have influenced their decision to evacuate the vessel immediately, rather than to attempt to contain and extinguish the fire. •• MGN 501 (F), which contains guidance on fire protection, is intended to be made mandatory in 2017. This will mean that the crew mess rooms of fishing vessels like Ardent II are fitted with a means of fire detection in the future. •• Regular visual inspection of electrical equipment to check for bare wires, that appropriate fuses are in place, and for signs of burning, together with regular PAT, would provide an effective means for reducing the risk of electrical fires. •• Although not a contributory factor of this accident, access to a fishing vessel in an emergency is something that owners and operators should take fully into account as part of their risk assessment before allowing crew to live on board in port.
11 ACTION TAKEN MAIB actions The Marine Accident Investigation Branch has: Issued a flyer to the fishing industry highlighting the safety issues identified in this report, and endorsing the practice of regular visual inspection and PAT of electrical equipment as an effective means for reducing the risk of electrical fires. RECOMMENDATIONS In view of current regulation and guidance, and that the voluntary code of practice for fishing vessels of 24m registered length and over is intended to become mandatory in 2017, no recommendations are made in this report. Safety recommendations shall in no case create a presumption of blame or liability
12 SHIP PARTICULARS Vessel’s name Ardent II Flag UK Classification society Not applicable IMO number/fishing numbers INS127 Type Fishing trawler Registered owner Private Manager(s) Grampian Sea Fishing Ltd Construction Steel Length overall 26.70m Registered length 24.36m Gross tonnage 251 Minimum safe manning Not applicable Authorised cargo Fish VOYAGE PARTICULARS Port of departure Peterhead Port of arrival Peterhead Type of voyage Not applicable Cargo information None Manning 7 MARINE CASUALTY INFORMATION Date and time 0500 16/8/16 (UTC+1) Type of marine casualty or incident Very Serious Marine Casualty Location of incident Peterhead Place on board Crew mess room Injuries/fatalities None Damage/environmental impact Constructive Total Loss Ship operation Alongside/moored Voyage segment Alongside/moored External & internal environment Dark, light breeze Persons on board 3
FD06046 | 2015_英国_fire-in-the-engine-room-on-the-suction-dredger-arco-avon-with-loss-of-1-life__MAIBInvRepor.pdf
分类:06_境外及港澳台调查报告 | 年份:2015 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
M A R I N E A C C I D E N T I N V E S T I G AT I O N B R A N C H ACCIDENT REPORT VERY SERIOUS MARINE CASUALTY REPORT NO 17/2016 SEPTEMBER 2016 Report on the investigation of a fire in the engine room on the suction dredger Arco Avon 12 miles off the coast of Great Yarmouth resulting in one fatality on 18 August 2015
Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2016 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. All MAIB publications can be found on our website: www.gov.uk/maib For all enquiries: Marine Accident Investigation Branch Spring Place 105 Commercial Road Southampton Email: maib@dft.gsi.gov.uk United Kingdom Telephone: +44 (0) 23 8039 5500 SO15 1GH Fax: +44 (0) 23 8023 2459 Press enquiries during office hours: 01932 440015 Press enquiries out of hours: 020 7944 4292
CONTENTS GLOSSARY OF ABBREVIATIONS AND ACRONYMS SYNOPSIS 1 SECTION 1 - FACTUAL INFORMATION 2 1.1 Particulars of Arco Avon and accident 2 1.2 Narrative 3 1.2.1 Pre-accident events 3 1.2.2 The accident 5 1.2.3 Post-accident events 9 1.3 Environmental conditions 9 1.4 Vessel, equipment and manning 9 1.4.1 Vessel background 9 1.4.2 Machinery 10 1.4.3 Fuel system 11 1.4.4 Engine room CO2 fixed fire-extinguishing system 11 1.4.5 Manning 15 1.5 Safety management, survey and inspection 16 1.6 International Maritime Organization initiatives 19 1.7 Accident site examination 19 1.8 Abrasive wheels 20 1.9 Personal protective equipment 25 1.10 Other technical investigations 26 1.11 Medical care 30 1.12 Previous / similar accidents 31 1.13 Voyage data recording 31 SECTION 2 - ANALYSIS 32 2.1 Aim 32 2.2 Overview 32 2.3 Third engineer’s actions 32 2.4 Lone watchkeeping 33 2.5 Source of ignition 34 2.6 Abrasive wheels and hot work 35 2.7 Personal protective equipment 35 2.8 Emergency response 36 2.9 Medical treatment 37 2.10 Maintenance and survey 37 2.11 Safety management system 38 SECTION 3 - CONCLUSIONS 39 3.1 Safety issues relating to the accident that have been addressed or resulted in recommendations 39 3.2 Other safety issues relating to the accident 40 3.3 Other safety issues that have been addressed or resulted in recommendations 40 3.4 Other safety issues 40 SECTION 4 - ACTIONS TAKEN 41 SECTION 5 - RECOMMENDATIONS 42
FIGURES Figure 1
Chart showing location of accident Figure 2
Port engine room vent Figure 3a
Engine room main deck access Figure 3b
Engine room tank top Figure 4
Fuel system Figure 5
CO2 cylinder room Figure 6
CO2 system operating control cabinet Figure 7a
CO2 cylinder valve Figure 7b
CO2 manifold valve Figure 8a
Tools and angle grinder as found Figure 8b
Accident scene with tools and cable reel Figure 9
Pipe showing leak and partially detached hoop bracket Figure 10
Defective fuel pipe Figure 11a - Hoop bracket Figure 11b - Hoop bracket wear Figure 12a - Evidence of additional fretting Figure 12b - Evidence of pipe interference Figure 13
Pipe support stanchion Figure 14a - CAT scan of angle grinder Figure 14b - CAT scan of angle grinder switch Figure 15a - Spray test Figure 15b - Spray test Figure 16
Coverall ignition and flame spread test ANNEXES Annex A
HSE Research Report 222 Annex B
MSN 1731 (M+F)
GLOSSARY OF ABBREVIATIONS AND ACRONYMS AB
Able Seaman ANSI
American National Standards Institute AVR
Automatic Voltage Regulator BA
Breathing apparatus BST
British Summer Time CAT Scan
Computerized axial tomography scanner cm
centimetre CO2
Carbon dioxide COSWP
Code of Safe Working Practices for Merchant Seamen consolidated edition 20101 DoC
Document of Compliance FR
Fire retardant FRS
Fire and Rescue Service HAML
Hanson Aggregates Marine Limited HSE
Health and Safety Executive IMO
International Maritime Organization ISM
International Safety Management (Code) kg
kilogramme kW
kilowatt “Mayday”
A word used internationally as a distress signal in voice radio communication meaning the prefix to “Grave and Imminent Danger to a Person, Ship, Aircraft or Other Vehicle Requiring Immediate Assistance” MCA
Maritime and Coastguard Agency MCR
Machinery control room mg
milligramme MGN
Marine Guidance Note MGO
Marine gas oil mm
millimetre MSN
Merchant Shipping Notice 1 Replaced with Code of Safe Working Practices for Merchant Seafarers 2015 edition in September 2015.
NCN
Non-conformance note NFRS
Norfolk Fire and Rescue Service OOW
Officer of the watch PMS
Planned maintenance system PPE
Personal protective equipment PPE 99
The Merchant Shipping and Fishing Vessels (Personal Protective Equipment) Regulations 1999 PTO
Power take-off PTW
Permit to Work RNLI
Royal National Lifeboat Institution s
second SCMG
Ship Captain’s Medical Guide SMC
Safety Management Certificate SMS
Safety management system STCW
International Convention on Standards of Training, Certification and Watchkeeping for Seafarers 1978, as amended UMS
Unmanned machinery space UTC
Universal co-ordinated time V
Volt VDR
Voyage Data Recorder VHF
Very high frequency TIMES: all times used in this report are BST (UTC +1) unless otherwise stated
1 SYNOPSIS At 2312 on 18 August 2015, a fire broke out in the engine room of the dredger Arco Avon while the vessel was loading a sand cargo approximately 12 miles off Great Yarmouth, UK. Arco Avon’s third engineer, Anthony Jones, was badly burned in the fire and later died as a result of his injuries. As a consequence of the fire, which was extinguished following activation of the CO2 smothering system, the vessel lost all power and remained at anchor with its dredging equipment partially deployed for 9 days until it could be taken under tow and delivered to a repair facility. The MAIB investigation concluded that: • The third engineer was attempting to repair a failed fuel pipe when fuel, under pressure in the pipe, ignited. • No one else on board was aware of a failed fuel pipe or that the third engineer had apparently decided to repair it. • The third engineer was using a portable angle grinder to access the repair site, and had underestimated the risk of doing so. • Possible contributing factors to the third engineer’s underestimation of risk were that he had neither carried out a formal risk assessment nor sought a permit to work prior to commencing the repair. The Maritime and Coastguard Agency has taken actions to review and update: • The Code of Safe Working Practices for Merchant Seafarers to address the hot work hazard of sparks generated by the use of fixed and portable angle grinders. • Merchant Shipping Notice 1870 (M+F) to introduce an appropriate standard for overalls for work in engine rooms or other area where there is a risk of fire. • The Ship Captain’s Medical Guide to provide clear guidance on the appropriate medical treatment for serious burns. The Maritime and Coastguard Agency has been recommended to more widely promulgate the contents of IMO Circular MSC.1/Circ.1321 i.e. that owners and operators conduct periodic inspections of low pressure fuel system components. Bureau Veritas has been recommended to advise its surveyors of the contents of the circular. Hanson Aggregates Marine Limited has been recommended to review and, as appropriate, amend its safety management system to ensure, inter alia, that manning levels, watchkeeping duties and communication procedures provide for safe engine room operations at all times.
2 SECTION 1 - FACTUAL INFORMATION 1.1 PARTICULARS OF ARCO AVON AND ACCIDENT SHIP PARTICULARS Vessel’s name Arco Avon Flag United Kingdom Classification society Bureau Veritas IMO number/fishing numbers 8508383 Type Suction dredger Registered owner Hanson Aggregates Marine Limited Manager(s) Hanson Aggregates Marine Limited Construction Steel Year of build 1986 Length overall 98.6m Registered length 92.74m Gross tonnage 3474 Minimum safe manning 8 Authorised cargo Dredge spoil VOYAGE PARTICULARS Port of departure Dagenham Port of arrival Dagenham (planned) Type of voyage Commercial Cargo information Sand Manning 10 MARINE CASUALTY INFORMATION Date and time 18 August 2015, 2312 Type of marine casualty or incident Very Serious Marine Casualty Location of incident Approximately 12 miles off Great Yarmouth, UK Place on board Engine room Injuries/fatalities 1 fatality Damage/environmental impact Fire damage to engine room power cabling and control systems. Smoke damage throughout engine room. Ship operation Loading (dredging) Voyage segment Mid-water External & internal environment Wind: F4, sea state: moderate Persons on board 10
3 1.2 NARRATIVE 1.2.1 Pre-accident events At approximately 1200 on 18 August 2015, Arco Avon left Dagenham and proceeded along the east coast of the UK to its designated loading area. Loading involved dredging within a defined geographical box, designated ‘240’ by The Crown Estate2, located approximately 12 nautical miles off Great Yarmouth. The dredging operation usually took about 5 hours to complete. At 2000, approximately 1 hour before arrival at the loading area, the officer of the watch (OOW) called the third engineer to prepare the machinery for loading. The third engineer then proceeded to the engine room and changed the alarm and monitoring system from its remote, unmanned configuration, to local control for manned machinery space operations. He then started No.2 generator and transferred the vessel’s electrical load from the shaft alternator on to No.2 generator and prepared the dredging pump which would be powered by the shaft alternator. The normal arrangement for power distribution during loading operations would have been for No.3 generator to provide power for the vessel’s services with the shaft alternator supplying power for the dredging pump. Due to a defect on No.3 generator’s voltage regulator this machine was unavailable for use. Loading commenced at approximately 2124, after which there was no further communication between the bridge team and the third engineer prior to the accident. 2 The Crown Estate is a diverse portfolio of UK buildings, shoreline, seabed, forestry, agriculture and common land that generates revenue for the government each year. Arco Avon
4 Figure 1: Chart showing location of accident Reproduced from Admiralty Chart BA 1543 by permission of the Controller of HMSO and the UK Hydrographic Office.
5 1.2.2 The accident Loading proceeded as planned until 2312, when a fire detector activated. The fire detection panel on the bridge indicated that the fire was within the engine room. The alarm was reset on the fire detection panel, which was situated on the bridge, but it immediately reactivated, sounding throughout the accommodation on each occasion. The alarm was then reset again but it activated for a third time, alerting the rest of the crew, some of whom had already responded to the initial alarm and had proceeded to the bridge. The remaining crew then mustered rapidly on the bridge, which was the designated emergency station, with the exception of the third engineer, who was on watch alone in the engine room, and the chief officer, who was asleep following his period of duty. The master looked aft as the crew were mustering and noted smoke coming from engine room vents (Figure 2). Having established that there was a fire in the engine room, the master immediately made two telephone calls to the engine room, both of which were unanswered. Following a discussion with the master, the chief engineer was about to leave for the engine room to investigate further when the third engineer telephoned the bridge. He told the chief engineer that there was a fire in the vicinity of No.2 generator and that he had been hurt. The chief engineer told him to evacuate the engine room. The call had been made from the machinery control room (MCR), which meant that the engineer had to re-enter the engine room and exit through the fire as there was no direct escape route from the MCR. Figure 2: Port engine room vent Soot residues caused by smoke prior to the vents being closed
6 The master ordered the designated fire team to dress in fire suits and breathing apparatus (BA) in preparation to fight an engine room fire. The team consisted of the second engineer and an able seaman (AB). The chief engineer left the bridge and went aft to assume the role of on-scene commander. He was accompanied by the bosun, whose role was to shut the engine room ventilation flaps. At approximately 2314 the master began to recover the dredging equipment as it was essential to raise the dredge pipe off the seabed while the vessel still had sufficient electrical power so as to prevent significant damage. Approximately 1 minute later, once the pipe was clear of the seabed, he stopped the dredging pump. These actions were carried out concurrently with fire-fighting preparations. As the chief engineer and the bosun reached the aft end of the main deck, they met the third engineer, who had just exited the engine room through the doorway to the main deck (Figure 3a). His clothes appeared to have been burned off, and he was showing obvious signs of physical trauma, but he was able to walk unaided. He spoke briefly to the chief engineer, repeating the information relayed in his earlier telephone call. The chief engineer told the bosun to take the third engineer to the crew mess room and to summon first-aid assistance; he then relayed this information to the master via a portable very high frequency (VHF) radio. At approximately 2322, as the bosun and third engineer were crossing the main deck, the vessel’s main power supply failed, leaving the deck in darkness. After a few seconds, power was briefly restored but then failed again. Several seconds later, the emergency generator started, restoring emergency lighting. The bosun and the third engineer were then able to continue to the mess room, where the third engineer was left in the care of the cook. The bosun then returned to the aft end of the main deck to continue closing the machinery space ventilation flaps. The chief engineer had remained at the aft end of the main deck and opened the engine room access door. He was met by dense smoke and heat, and concluded that the fire team would be unable to enter the engine room. When the main electrical power failed at 2322, the voyage data recorder (VDR) ceased recording and power for recovery of the dredging equipment was lost. The second engineer dressed in a fire suit and BA, which was located on the bridge, while the fire team AB went to the forward machinery access void space to collect an additional fire suit and BA. The AB then took his equipment to the crew mess room, where the cook and another AB helped him to dress. The plan was for the fire team to proceed along one of the two tank top void spaces and enter the engine room through the door at the aft end of the void (Figure 3b). The chief officer had assisted the second engineer to dress and had left the bridge with him to take control of the fire team. However, the second engineer went ahead and proceeded alone along the starboard void space. The chief officer began preparations to rig a fire-fighting hose, for use by the fire team, from a hydrant at the forward end of the starboard void space. On arrival at the engine room entrance the second engineer opened the access door and quickly realised that the prevailing heat and smoke would prevent the fire team from entering the space. Aware that he was detached from the team and without means of communication, he closed the engine room door and began to retreat back along the starboard void. On reaching the forward end of the void, he met the fire team AB. The second engineer explained the situation to the AB,
7 Figure 3a: Engine room main deck access Main deck engine room access door Location of CO2 system control Figure 3b: Engine room tank top Fire scene Port void engine room access door Starboard void engine room access door
8 following which the two firefighters reported their findings to the chief officer. The chief officer then contacted the master using VHF radio and passed the information that the fire team were unable to enter the engine room. At 2325, the master broadcast a “Mayday”. He followed this up at 2336 with a request for evacuation of an injured crew member. Humber Coastguard responded by tasking a rescue helicopter and a Royal National Lifeboat Institution (RNLI) all-weather lifeboat to stand by. The chief engineer reported by VHF radio to the master and recommended that the engine room CO2 fixed fire-extinguishing system be activated to extinguish the fire. The master required a personnel muster to be completed before he would give approval to activate the CO2 system. Completion of the muster was delayed as a result of some confusion regarding the location of the second engineer. Once approval had been given, the chief engineer operated the CO2 system from its remote operating position in the main deck engine room access lobby. The chief engineer believed that the CO2 system had functioned correctly; however he went to the CO2 cylinder room to check. He found that approximately 50% of the cylinders had failed to operate, which he then manually activated. At 2338 the master reported to the Coastguard that CO2 flooding of the engine room had been carried out. Following operation of the CO2 system, the crew focused their efforts on containment of the fire through engine room boundary cooling and temperature monitoring. The only cooling required was on the main deck, directly above the seat of the fire. Water for boundary cooling was supplied by the vessel’s diesel-driven emergency fire pump that was located in the forward machinery space. During this period, the port anchor was deployed to ensure that the vessel remained in a navigationally safe position. The third engineer remained in the crew mess room accompanied by the cook, who had been designated the first-aider. Although visited by several members of the crew, including the master, his medical care was left solely to the cook and this was limited to the provision of liquid refreshment in the form of fruit squash. At 2352, the master reported to the Coastguard that the fire was under control, the engine room had been shut down and that the surrounding decks were cooling. The master reiterated concern over the serious condition of the third engineer and, at 2356, the Coastguard gave an estimated time of arrival of 15 minutes for an RNLI lifeboat and 35 minutes for a rescue helicopter. At 0013 on 19 August, two crew from the Gorleston RNLI lifeboat, one of whom was a paramedic, boarded Arco Avon. The paramedics assessed the third engineer’s condition and commenced medical treatment, which included administration of medical oxygen and pain relief medication. Following the arrival on scene of rescue helicopter R912, discussions between the helicopter pilot and the master identified the stern of the vessel as the most appropriate area for winching operations. The third engineer was placed in a stretcher and, with some difficulty, he was manoeuvred along the deck to the agreed winching position. At 0137, R912 departed for the Norfolk and Norwich University Hospital with the third engineer embarked. However, despite further medical treatment, the third engineer died of his injuries later that day.
9 As a result of discussion between the Coastguard and Norfolk Fire and Rescue Service (NFRS), consideration was given to airlifting a fire-fighting team out to the vessel. However, at 0250, the master reported to the Coastguard that the fire had been extinguished and that the situation on board was under control. Following this, the Coastguard released all search and rescue units from the scene and the decision was made that the NFRS team would board the vessel as it arrived in port. The vessel’s owner, Hanson Aggregates Marine Limited (HAML) arranged for a tug, Sea Beaver, to stand by Arco Avon in case further assistance was required. Arco Avon remained at anchor overnight with all of its remaining crew on board. 1.2.3 Post-accident events It was initially intended that Arco Avon would be towed into Great Yarmouth to allow an assessment of the damage and a forensic examination of the fire scene. However, owing to the vessel’s increased draught as a result of its partially deployed dredging equipment, there was insufficient depth of water for it to enter Great Yarmouth. The dredging equipment could not be recovered due to a lack of electrical power and possible damage to the vessel’s main switchboard, which was located in a compartment within the engine room and could not therefore be accessed. Despite an examination by a salvage team who had been appointed by the owners, an alternative method of recovering the equipment safely could not be identified. On the evening of 19 August, some of Arco Avon’s crew departed the vessel, leaving the master, chief engineer, second engineer and chief officer on board with a tug standing by in attendance. The crew noted that water was entering the engine room bilges. It was concluded that a seawater-fed cooler in the vicinity of the seat of the fire was the most likely cause of sea water ingress. During the dredging operation the main sea water suction intakes had been changed over from the main engine room to the forward machinery space to reduce contamination caused by the dredging process. This meant that the crew were able to enter the forward machinery space and close the sea water isolation valves to stem the leak. A salvage pump was provided by the tug to allow removal of the flood water. On the evening of 20 August the master, chief engineer, second engineer and chief officer were replaced by a relief crew. In view of a forecast of deteriorating weather and high winds for the area, a salvage operation was initiated by HAML and, on 22 August, the vessel was towed to a sheltered anchorage. Arco Avon was taken to a repair/layby berth in Hull on 27 August. 1.3 ENVIRONMENTAL CONDITIONS At the time of the accident, weather conditions were good, with a moderate sea state and force 4 winds. 1.4 VESSEL, EQUIPMENT AND MANNING 1.4.1 Vessel background Arco Avon was a suction dredger operated by HAML, the UK marine division of the Heidelberg Cement Group. The vessel was constructed in 1986 and was the first of four sister vessels built by Appledore Shipbuilders Limited.
10 The vessel was built to the requirements of The Merchant Shipping (Cargo Ship Safety Construction and Survey) Regulations 1984 and The Merchant Shipping (Fire Protection) Regulations 1984. Compliance with the regulations was verified under survey by Bureau Veritas (BV). Arco Avon was classed by BV for dredging up to a distance of 15 miles offshore. The vessel’s recent operations had involved loading sand and gravel off the coast of Great Yarmouth and discharging the cargo at Dagenham. 1.4.2 Machinery Propulsion Arco Avon’s propulsion comprised a Mirrlees Blackstone KMR6 Mk3, 4 stroke, single acting, 6 cylinder in line diesel engine driving a controllable pitch propeller through a reduction gearbox. At the free end of the engine, was a power take-off (PTO) driving a shaft alternator (known on board as No.1 generator) through a flexible coupling. The shaft alternator supplied 1,800kW at 660V. Auxiliary generators Arco Avon was equipped with two auxiliary generators: • A Mirrlees ESL 8 Mk II 8 cylinder engine rated at 1065kW (known on board as No.2 generator) that generated electricity at 660V. • A Caterpillar 3408 DI-TA 8 cylinder engine (designated the harbour generator on the vessel’s plans, although known on board as No.3 generator), that generated electricity at 415V. Generator configuration Arco Avon’s electrical supply and distribution system could be configured in a number of different ways to suit particular operations. When in transit, all electrical power was provided by the shaft alternator through a step down transformer to 415V to supply the vessel’s services. When loading, the shaft alternator provided power directly to the dredging pump, which required 660V, with all other services supplied by No.3 generator. When discharging, No.2 generator provided all required electrical power. At the time of the accident, Arco Avon’s No.3 generator was out of service due to a fault with its automatic voltage regulator (AVR) that limited the supply voltage to about 380V. This prevented it from being synchronised with the other generators. Although spare parts to rectify the defect had been delivered before the vessel’s departure from Dagenham on 18 August, these were found to be incorrect and the fault was not repaired. The chief engineer conducted an impact assessment and concluded that the vessel could continue to operate. The defect meant that loading operations would be carried out using the shaft alternator to supply power for the dredge pump and No.2 generator to supply the rest of the electrical load. However, the lack of redundancy meant that if any further electrical faults developed, dredging operations would have to be curtailed. The master concurred with the assessment but the operational
11 programme was amended to carry a sand load to Dagenham instead of a mixed load of sand and gravel to Belgium. This was to allow service engineers to meet the vessel at Dagenham and repair the defective AVR. 1.4.3 Fuel system Arco Avon’s main engine and auxiliary generators ran on marine gas oil (MGO), commonly referred to as diesel. Fuel was stored in two wing bunker tanks, treated directly through a centrifugal purifier, and transferred to two daily service tanks (Figure 4). Fuel for the main engine was pumped from the service tanks via booster pumps to a main engine fuel supply rail, from which high pressure injection pumps took their suction. Surplus fuel was returned to the suction side of the booster pumps via a pressure regulating valve designed to maintain the return side of the system at a minimum pressure of approximately 1.8 bar. The auxiliary generator engines’ fuel supplies were gravity-fed directly from the service tanks with returns directed back to these tanks. The fuel system pipework was manufactured from steel and complied with ANSI3 schedule 40, which classified it as a 1½ inch (38mm) pipe, with an outside diameter of 1.90 inches (48mm) and a wall thickness of 0.15 inch (4mm). The pipe ran beneath the engine room floor plates on the outboard side of No.2 generator. It was supported along its length by steel hoop brackets, clamping it against support stanchions. 1.4.4 Engine room CO2 fixed fire-extinguishing system The engine room fixed fire-extinguishing arrangements were provided by a Kidde CO2 smothering system. The system comprised 23 x 45kg CO2 cylinders arranged for simultaneous release that was designed to achieve a ≥40% by volume concentration of CO2 in the space. The CO2 cylinders were located in a dedicated storage room on the starboard side at the aft end of the main deck (Figure 5). The amount of CO2 needed to reduce the oxygen level to a point at which fuels are prevented from burning varies depending upon the properties of individual fuels. To ensure that smothering systems are effective, the concentration of CO2 required is relatively high (40% in a marine environment) and this therefore results in an atmosphere which cannot sustain human life. The CO2 system was activated from an operating cabinet located in the access lobby to the engine room at the aft end of the main deck (Figure 6). The cabinet door was kept locked with a key available in a ‘break glass’ box on the front of the cabinet. Opening the cabinet automatically sounded an alarm and stopped the engine room ventilation fans. Inside the cabinet were two pilot cylinders, each with its own isolation valve, and two main system valves. Valve A was operated to open the discharge manifold to the engine room distribution pipework. Valve B was then opened to allow gas pressure from the pilot cylinders to operate a piston in the discharge valve fitted to each of the main cylinders (Figure 7a) which, in turn, allowed gas from the main cylinders into the discharge manifold. If the remote operation failed, the discharge manifold valve could be opened locally in the CO2 cylinder room (Figure 7b) and the main CO2 cylinders could be opened manually. 3 American National Standards Institute.
12 Figure 4: Fuel system Main engine fuel supply rail and high pressure injection pumps Pressure regulating valve Return line Daily service tanks Main engine booster pumps Bunker storage tanks
13 Figure 5: CO2 cylinder room Figure 6: CO2 system operating control cabinet Isolation valves Main system valves Pilot cylinders
14 Figure 7a: CO2 cylinder valve Manual operating valve Main cylinder discharge valve Figure 7b: CO2 manifold valve Discharge manifold valve
15 1.4.5 Manning Arco Avon had been issued with a safe manning document requiring a minimum of eight crew, including a chief engineer, a second engineer and one additional watchkeeping engineer. There was no requirement for any engine room ratings. The document was endorsed for Unmanned Machinery Space (UMS) operations stating: ‘a lone watchkeeper must not attend the machinery spaces unless a suitable watch alarm is fitted and operational or an alternative system is in place.’4 At the time of the accident, there were 10 crew on board, with the engineering department’s manpower at the minimum level required by the safe manning document. Arco Avon was manned with a crew of UK nationals. During transits to the loading area, they operated with a deck officer and lookout on the bridge and the engine room in the UMS mode. When dredging, the bridge manning was supplemented by the master, who controlled the dredging operation, and the engine room reverted to a manned condition with a single engineer officer as watchkeeper. All crew members were employed through Hanson Ship Management Limited, a crewing agency dedicated to providing manpower for HAML vessels. Master The master was an experienced seafarer and had worked within the dredging industry for more than 20 years. He held an STCW II/2 qualification and had been master on Arco Avon since 2011. Chief engineer The chief engineer had started his career in the Royal Navy and, after serving approximately 8 years, left to join the Merchant Navy. His civilian seafaring was predominantly within the dredging industry, where he had fulfilled the roles of both chief engineer and technical superintendent. He held an STCW III/2 qualification and had been chief engineer of Arco Avon since 2013. Third engineer Anthony (Tony) Jones had served for 26 years in the Royal Navy. On leaving in 1994, he had an interest in a motorcycle repair business and then relocated from Devon to Kent, where he worked in the ship repair industry before joining the Merchant Navy. He spent 2 years working on ferries before moving to the dredging industry. He joined Hanson Ship Management Limited in 2013 and was appointed to Arco Avon as third engineer. He held an STCW III/1 qualification. Tony was well regarded on board Arco Avon and within the company. He was noted for being extremely ordered, and for identifying issues that needed attention and completing tasks as soon as practicable. Tony died as a consequence of severe burns he received in the fire. Postmortem examination results gave the cause of death as multiple organ failure. Subsequent toxicology results indicated that he had consumed no alcohol. 4 Section 15.9.1 of the Code of Safe Working Practices for Merchant Seamen (COSWP) 2010 edition, which was the current version at the time of the accident, states that seafarers should only enter or remain in an unmanned machinery space alone to carry out a specific task that they may be expected to complete in a comparatively short time. Furthermore, before entering, leaving and at regular intervals while within the space, they must report by telephone or other means provided to the duty deck officer. Similar guidance is now provided in the Code of Safe Working Practices for Merchant Seafarers 2015 edition.
16 1.5 SAFETY MANAGEMENT, SURVEY AND INSPECTION Safety Management System (SMS) HAML operated a fleet of eight dredgers (seven in service and one in long-term lay-up). Seven vessels were managed under a Document of Compliance (DoC) issued to the company by the MCA on 15 November 2010 and individual Safety Management Certificates (SMC) issued to each ship. The DoC had been subject to annual verification by the issuing authority, the last audit having been carried out on 11 February 2015. Arco Avon’s SMC was issued on 27 May 2015. The attending MCA auditor noted that: • There was a comprehensive system in place for risk assessments and permits to work. • The maintenance of the deck and engine room departments was of a high standard. • Engine room maintenance and cleanliness were of a high standard. • The SMS contained a list of potential shipboard emergencies, which formed part of the vessel’s regular emergency drill programme. • During the fire drill the ability and knowledge of the two BA wearers were particularly good. The auditor issued two non-conformance notes (NCN), one related to crew familiarisation with SMS updates and the other to evidence of annual document review. Permits to work Within the master’s standing orders, which applied to all crew, there was reference to the permit to work (PTW) system and risk assessments. The following statement appeared under the heading of risk assessments: ‘The vessel operates its own risk assessment procedure. The ships staff are to generate a risk assessment for all tasks carried out onboard prior to any job being undertaken. All personnel onboard should be involved in risk assessment. All risk assessments should be used in conjunction with the company permit to work system. All risk Assessments should be reviewed every 12 months.’ [sic] No evidence was found to indicate that a documented risk assessment had been conducted or a PTW had been raised in respect of the attempted fuel pipe repair that is concluded to have resulted in the fire. Lone working The SMS contained instruction relating to lone working in the engine room: ‘Engine Room Procedures AE09 Lone Working in the Engine Room
17 Ref – CoSWP 15.9 – Unmanned Machinery Space This procedure applies to both Engineer Officer of the Watch and any other member of the crew entering the engine room at any time.
- The term ‘Engine Room’ applies to all machinery spaces
- The use of machinery spaces as a means of access to other areas of the ship
should be avoided
- Whenever anyone enters a machinery space, whether alone or with a co-worker,
the bridge Officer of the Watch must be informed
- Whenever anyone enters a machinery space they should be equipped with a
hand held radio which is in contact with the bridge OOW
- It is accepted that there may be areas of the engine room where there is no, or
poor, radio reception. These areas should be identified and additional safeguards put in place, eg inform the bridge OOW and increase frequency of telephone contact
- Whenever a lone worker or watchkeeper is in the engine room, the Patrol (or
Watchkeeping) Alarm must be activated
- If the Patrol Alarm is out of service then an alternative robust procedure must
be put in place, eg regular phone or radio contact at intervals of no more than 15 minutes or increase the manning of the watch
- Whenever work is carried out in the engine room or machinery spaces, especially
by a lone worker, particular attention should be paid to safe working practices as laid down in the CoSWP, in particular (but not exclusively) with regard to – • Manual handling • Machinery guarding • Personal Protective Equipment – especially hearing protection • The handling of dangerous substances • The use of hand tools • The use of portable electrical equipment’ Loading operations The chief engineer’s standing orders also formed part of the SMS and contained a specific section relating to loading operations: ‘LOADING OF SHIP
- The Bridge will notify the Duty Engineer before loading is due to commence.
- De-ballasting can commence on instruction from the Bridge OOW.
- Ensure sufficient power is available and systems ready for loading.
18
- Change over SW suctions from Aft to Forward. The Forward SW suction only is
to be used whilst dredging.
- Before starting check IHC power pack and Dredge pump L.O. tank levels. Check
Auto-greaser level. Ensure flushing pumps are running.
- During load the Duty Engineer will progress routine duties and planned
maintenance as required.
- Duty Engineer is to inform the Bridge of his whereabouts should he need to leave
the machinery space.
- On completion of loading the Bridge will normal inform the Engine Room that
loading is completed.
- SW suction can now be changed from Forward to Aft.
- The bridge will inform the Engine Room de-watering may commence.
- Inform the Chief Engineer of any problems immediately.’ [sic]
Maintenance Coupled with the SMS was a computer-based planned maintenance system (PMS). The PMS was used for both routine tasks based on a formal planned maintenance strategy, and for the recording of ad hoc tasks generated manually to record breakdowns and repairs. Classification society surveys Arco Avon’s certificate of class was issued by BV on 10 November 2011. A range of class surveys had been carried out by BV in February 2015. These included annual, continuous and occasional machinery surveys. The following is an extract from Bureau Veritas Rules for the Classification of Ships: ‘Chapter 3 - ‘Scope of Surveys’ (All Ships) 3.5 Systems in machinery spaces 3.5.2 The fuel oil, lubricating oil, hydraulic oil, thermal oil, and feed and cooling water systems, together with pressure filters, heaters and coolers used for essential services, are to be opened up and examined or tested, as considered necessary by the Surveyor. Safety devices for the foregoing items are to be examined.’ In respect of the class surveys conducted on board Arco Avon, there had been no concerns raised relating to the low pressure fuel pipework or the fuel system in general.
19 1.6 INTERNATIONAL MARITIME ORGANIZATION INITIATIVES IMO circular MSC.1/Circ.1321 – Guidelines for Measures to Prevent Fires in Engine-Rooms and Cargo Pump-Rooms was issued on 11 June 2009. The circular contained annexed guidelines detailing the prevention measures. Part III Chapter 1 of the Annex concerns the control of flammable oils within engine rooms. It covers issues with design and installation, maintenance, system pressure pulses and vibration. The following is an extract: ‘1.5 Inspection and maintenance 1.5.1 The ship safety management system should contain procedures to identify vibration, fatigue, defects, poor components and poor fitting of the fuel system and ensure that proper attention to protecting hot surfaces is maintained. Means, such as check lists should be prepared to ensure that all procedures are followed at major overhauls and that all components, supports, restraints, etc., are refitted on completion of such work. The installed system should be routinely inspected for: .1 verification of the adequacy of its supports and the condition of its fittings; .2 evidence of fatigue stresses to welded or brazed pipes and connections; .3 assessment of the level of vibration present; and .4 condition of the lagging or shielding of hot surfaces. 1.5.2 Components of the fuel system should be comprehensively examined, particularly threaded connections, at each dismantling. 1.5.3 Injection pump holding-down bolts should be proved tight by testing with a torque spanner at frequent intervals (not to exceed 3 months). 1.5.4 The supports and retaining devices of the low pressure fuel system should be checked at regular intervals (not to exceed 6 months), to be proved tight and to provide adequate restraint. The lining of such devices should be examined for wear and renewed if they provide insufficient support.’ The circular invited Member Governments to bring the annexed guidelines to the attention of ship designers, owners, operators, shipbuilders and other parties concerned. This had not been formally actioned in the UK. 1.7 ACCIDENT SITE EXAMINATION An examination of the accident site was conducted by MAIB inspectors from 28 August 2015. There was evidence of heat and flame damage on the outboard side of No.2 generator which extended around the area local to the fire scene. The contents of a mezzanine deck used for storage directly above the fire scene were burned, and plastic fittings and containers had melted with debris from the deck falling down onto the accident site. There was severe smoke damage throughout the engine room.
20 Smoke patterns and heat damage generally radiated away from the deck adjacent to the bedplate of No.2 generator. Electrical power cables and control wiring in the vicinity of No.2 generator had suffered extensively from heat damage. Floor plates adjacent to No.2 generator were missing, giving access to a defective fuel pipe located beneath the floor plates. An angle grinder, a spanner, and a ratchet with an attached socket were located on the floor plates adjacent to the access opening (Figure 8a). A cable reel to provide power to the angle grinder was plugged into a nearby power socket (Figure 8b). A number of hose clips and pieces of rubber jointing material were found on the workshop bench along with spare angle grinder discs and, in the vicinity, an operators’ handbook. The hoop bracket supporting the fuel pipe at the position of the leak was hanging below the pipe with one retaining nut still in place (Figures 9 and 10). The other end of the bracket was sheared off and the remaining nut was seized onto the bracket. The bracket had significant material wastage and was twisted along its length (Figures 11a and 11b). Along the length of the defective fuel pipe there was evidence of fretting in way of the support brackets and from contact with other pipes where flanged pipe joints rested against the fuel line (Figures 12a and 12b). The pipe supporting stanchion in way of the hanging hoop bracket displayed evidence of a cut, the width of which matched the thickness of the angle grinder disc (Figure 13). 1.8 ABRASIVE WHEELS Safe use of, and the associated hazards relating to abrasive wheels is referred to both in COSWP and by the Health and Safety Executive (HSE) in its publication HSG17 (third edition published 2000) ‘Safety in the use of abrasive wheels’. COSWP section 20.4 gives guidance on the use of portable power-operated tools but does not specifically refer to angle grinders. Section 20.6 is titled abrasive wheels and contains information relating to fixed bench grinders and their abrasive wheels but makes no reference to the use of portable grinders. HSG17 is a comprehensive document which recognises that portable and hand-held grinding machines form the largest number of abrasive wheels in use and details checks, tests and standards relating to the equipment. Neither the guidance in COSWP nor that within HSG17 makes any reference to the hazards created by the sparks generated during grinder operation. Although not referred to in its guidance (HSG17), in 2004 the HSE produced a research report (HSE Research Report 2225), which studied the ignition and flame spread of clothing fabrics subjected to angle grinder sparks (Annex A). The findings of this project are discussed at Section 1.10. COSWP chapter 24 identifies that risk assessments and appropriate control measures are required to protect personnel affected by hot work. It states that welding and flame-cutting activities in places other than the workshop should generally be the subject of a PTW. While acknowledging welding and flame-cutting as hot work activities, the chapter makes no mention of cutting and grinding using abrasive wheels. 5 Research Report 222 – Tests for the ignition of flame spread of clothing fabrics subjected to angle grinder sparks – prepared by Building Research Establishment Ltd for the HSE 2004.
21 Figure 8a: Tools and angle grinder as found Debris from mezzanine deck Angle grinder Socket and ratchet Spanner Cable reel Tools Fire site No.2 generator Figure 8b: Accident scene with tools and cable reel
22 Figure 9: Pipe showing leak and partially detached hoop bracket Figure 10: Defective fuel pipe Pipe support stanchion Hoop bracket Hole in pipe Defective pipe Hole in pipe Evidence of fretting
23 Figure 11a: Hoop bracket Figure 11b: Hoop bracket wear Fractured end Wear from bracket location in support stanchion
24 Figure 12a: Evidence of additional fretting Figure 12b: Evidence of pipe interference Evidence of fretting Evidence of fretting
25 The Code of Safe Working Practices for Merchant Seafarers 2015 edition provides similar guidance to that referred to above in respect of COSWP consolidated edition 2010, which it replaced in September 2015. One of the risk assessments (Engine Room Work Shop Activities) in Arco Avon’s SMS, noted the need to keep flammable material away from the bench grinder in the workshop. However, use of the bench grinder was listed as a non-hot work activity and the instruction was not extended to the use of portable grinders. The operators’ handbook for the portable angle grinder found at the accident site stated, in two separate sections, that the tool should not be operated near flammable materials as sparks could ignite them. While Arco Avon’s crew generally acknowledged that use of an angle grinder constituted a hot work activity, a PTW was often not implemented, particularly in respect of work carried out within the machinery spaces. 1.9 PERSONAL PROTECTIVE EQUIPMENT The Merchant Shipping and Fishing Vessels (Personal Protective Equipment) Regulations 1999 (PPE 99) require ship owners and employers to ensure that personal protective equipment (PPE) is provided for seafarers engaged in, or at risk Figure 13: Pipe support stanchion Hoop bracket Angle grinder witness mark
26 from hazardous work activities on board UK registered ships. MSN 1731 (M+F)6 (Annex B) details standards of PPE and states that work in engine rooms or any area where there is a risk of fire requires overalls made of fabric of low flammability. To enhance safety, HAML policy had been for all crew to wear high-visibility coveralls when on the outside deck of their vessels and, with time, this practice had extended to the engine room. During an onboard safety committee meeting on 5 May 2014, crew members on a sister vessel had raised concerns that the high-visibility coveralls, which were only supplied as a polyester/cotton garment, may not afford the level of low flammability required under PPE 99. Subsequently, HAML revised its policy and issued a Fleet Directive (E356) dated 18 December 2014, detailing the PPE that each employee was entitled to have, and the process for ordering and obtaining it. Engineers were allowed three white cotton coveralls and one high-visibility polyester/cotton coverall. The revised PPE policy also stated that engineers should wear a high-visibility vest over their cotton coveralls when on the outside deck. 1.10 OTHER TECHNICAL INVESTIGATIONS Angle grinder The angle grinder found on the engine room floor plates adjacent to the failed fuel pipe was examined using a computerized axial tomography scanner (CAT scan) to determine its operating condition (Figure 14a). The scan identified that the operating switch contacts were open, indicating that the grinder had been switched off (Figure 14b). Fuel pipe testing Flow and spray tests on the defective fuel pipe were conducted by the MAIB in conjunction with Burgoynes, Consulting Scientists and Engineers, who were acting on behalf of HAML. Tests were carried out using water at a range of pressures from 1 through to 5 bar, with 2 bar being deemed most representative of the likely pressure in the pipe at the time of the accident. The tests showed a powerful jet of fluid spraying from the hole in the defective pipe. The flow and pressure were sufficient for the fluid to atomise as it hit the ground beneath the test rig (Figure 15a). When a screwdriver was introduced into the jet to simulate the position of the hoop bracket, the degree of atomisation increased significantly (Figure 15b). PPE flammability testing Flammability testing of coveralls available to the third engineer (67% polyester 33% cotton and 100% cotton) along with a control sample from a new 67% polyester 33% cotton coverall were carried out at a UK test facility. Limited flame spread testing according to the provisions of EN ISO 15025:2002 of three fabric samples was carried out: Sample 1 - 100% cotton – used but laundered. Sample 2 - 67% polyester 33% cotton – used but laundered. Sample 3 - 67% polyester 33% cotton – new and unused. 6 Replaced with MSN 1870 (M+F) in January 2016. The details relating to engine room PPE (overalls) remain unchanged.
27 Figure 14a: CAT scan of angle grinder Figure 14b: CAT scan of angle grinder switch Open contacts
28 Figure 15a: Spray test Figure 15b: Spray test Defective pipe Spray pattern representative of impact with hoop bracket
29 The tests showed that each of the samples was made from a fabric that supported combustion after removal of the ignition source. These results demonstrated that neither of the coverall types available to the third engineer would have given any flame or heat protection. Following the initial tests, a further sample of each garment was soaked in diesel to determine the likely effects of ignited diesel on each fabric type. Adding diesel significantly increased the burning rate of all the samples. None of the coveralls from which the samples were taken were labelled to indicate that they were designed or supplied to give heat or flame protection. The following standards are recognised as applicable to PPE tested against EN ISO 15025:2002 to meet limited flame spread claims: EN ISO 14116:2015: Protective clothing. Protection against flame. Limited flame spread materials, material assemblies and clothing. EN ISO 11611:2015: Protective clothing for use in welding and allied processes. EN ISO 11612:2015: Protective clothing. Clothing to protect against heat and flame. HSE Research Report 222 (Annex A) tested a number of fabrics for ignition and flame spread when they were subjected to angle grinder sparks. The report studied natural and synthetic fabrics and both untreated and fire retardant (FR) garments. The report’s conclusions include the following: • ‘The range of synthetic and natural fibres tested showed ignition times and flame-spread rates covering a wide range but there was no particular distinction between values obtained for the two types. • Synthetic fibres tended to melt and natural fibres tended to form a surface char, both effects having a strong influence on performance in the ignition and flame spread tests. • Natural/synthetic fibre mixes were not particularly distinguishable from their “pure” counterparts. • A cotton fabric marked as “FR interliner” ignited readily. • A cotton fabric purchased as “FR” and checked for acceptable FR content by elemental analysis did exhibit very limited ignition and flame spread behaviour, both before and after being subject to a single standard laundry cycle. • Tests on a full sized manikin clothed in separate tests with an FR and non FR “coverall” demonstrated the value of FR treated materials when subjected to sparks from an angle grinder. The FR coverall did not ignite after 5 minutes of sustained spark impingement whereas the non FR coverall ignited after approximately 20 seconds and burnt to completion.’ (Figure 16) Courtesy of HSE Figure 16: Coverall ignition and flame spread test after approximately 45 seconds (ignition occurred at approximately 20 seconds)
30 1.11 MEDICAL CARE Requirements for the provision of onboard medical care are defined in The Merchant Shipping (Maritime Labour Convention) (Minimum Requirements for Seafarers etc.) Regulations 2014, which are promulgated through MGN 482 (M) Maritime Labour Convention, 2006: Medical Care. Under these regulations, ship owners are required to provide seafarers with medical care on board ship. This is achieved through a combination of the provision of medical stores and training of personnel. The Merchant Shipping Act 1995 Part III Chapter 53 states that where a ship does not carry a doctor, the master is responsible for ensuring that any necessary medical attention is given by him or under his supervision by a duly appointed person. On Arco Avon, the master’s standing orders stated that the OOW was to administer first-aid treatment and that the master was to be informed. The master was also to be informed immediately of any major injury occurrences, and was to be consulted if there were any doubts concerning treatment. The Ship Captain’s Medical Guide (SCMG) is published by the MCA for use on ships not carrying a doctor. The guide gives the following advice in respect of burns: ‘Burns and scalds, clothing on fire ■ by far the best way to put out a fire on a person is to use a dry powder fire extinguisher at once; ■ if a dry powder extinguisher is not available, then lay the person down and smother the flames by wrapping him in any available material (not made of man-made fibre), or throw buckets of water over him, or use a hose; ■ make sure all smouldering clothing is extinguished. NOTE: The powder from a fire extinguisher will not cause much, if any, eye damage. Most people shut their eyes tightly if sprayed with powder. Any powder which gets in the eye should be washed out immediately after the fire has been extinguished and while cooling is being undertaken. Heat burns and scalds ■ all heat burns should be cooled as quickly as possible with running cold water (sea or fresh) for at least ten minutes, or by immersing in cold water and keeping the injured part in motion; cooling of extensive burns (>15%) should be avoided as hypothermia will result; ■ if it is not possible to cool the burn on the spot, the casualty should be taken to where cooling can be carried out; ■ try to remove clothing gently but do not tear off any which adheres to the skin; ■ then cover the burned areas with a dry, non-fluffy, dressing which is larger than the burns and bandage in place; ■ further treatment as in Chapter 4.
31 Chapter 4 ■ burns of over 18% of the body surface in adults or 10% in children or older persons … Until removed to hospital put the patient to bed and seek to restore the fluid balance by encouraging the patient to drink as much as possible. Put rehydration powder into the drink according to the instructions; (if not available dissolve 1 teaspoonful of salt in 1/2 litre of water). If vomiting occurs and persists, fluid per rectum may be necessary. Relieve pain and start antibiotic treatment. Remove rings, jewellery or constricting items of clothing. Anxiety may be relieved by giving diazepam 5 mg, repeated every 4 hours. Cling film makes a good temporary dressing for large burns.’ The SCMG was not referred to on board Arco Avon following the accident and prior to the third engineer’s evacuation by helicopter. 1.12 PREVIOUS / SIMILAR ACCIDENTS The MAIB and other authorities have investigated a number of fires and incidents relating to failures in low pressure fuel systems. These have largely been the result of flange/joint failures rather than pipe failures, but have resulted in similar atomised fuel leaks. Norsea On 2 September 2002, the passenger/ro-ro cargo ferry Norsea suffered an engine room fire while on passage in the North Sea. A low pressure fuel pipe had fretted against its clamp and housing, causing a small hole in the pipe’s wall. Following its own investigation of the accident, the management company introduced a monthly procedure for checking the security of fuel pipes, clamps and mounting bolts, and inspection of pipework for chafing. It also fitted additional clamps to the pipework. At the time of the accident, Norsea’s engine room was manned by a lone engineer. The MAIB investigation report No.16/2003 states: ‘It might be argued that machinery spaces which are manned are likely to provide an enhanced level of vessel safety. However, when attended by a lone watchkeeper, who is protected only by a watch alarm designed for short inspection visits, any improvement in vessel safety might be at the price of placing that watchkeeper at an elevated level of risk’. 1.13 VOYAGE DATA RECORDING The information from the VDR was downloaded on 21 August 2015 while the vessel was still at anchor off Great Yarmouth. The information had been correctly saved by the crew. However, contrary to VDR performance standards and for reasons that have not been established, the unit did not continue to record using its own uninterruptible power supply when the vessel lost its main power supply.
32 SECTION 2 - ANALYSIS 2.1 AIM The purpose of the analysis is to determine the contributory causes and circumstances of the accident as a basis for making recommendations to prevent similar accidents occurring in the future. 2.2 OVERVIEW Arco Avon suffered an engine room fire that resulted in the death of the third engineer. Physical evidence from the fire scene indicates that the third engineer was attempting to remove a securing bracket so he could make a temporary repair to a leaking low pressure fuel return pipe on the main engine fuel system. The main engine remained running throughout the repair attempt. During the process his overalls became soaked in fuel and, when he used a portable angle grinder to remove the bracket, high energy sparks from the grinding disc ignited the atomised fuel from the leak and his diesel soaked clothing. This resulted in the fire in the engine room. He was able to exit the engine room and reach medical assistance, but not before he had sustained burns that ultimately proved fatal. It is not known why the third engineer attempted such a hazardous repair on his own and without informing the bridge watchkeeper or the chief engineer of either the problem or his intentions. However, the onboard routines for lone working in the engine room specifically allowed maintenance to be carried out during the watch. While there was a documented requirement to complete a PTW this was often waived for work in the machinery spaces. Further, reports of the third engineer’s character indicate that once he had started the repair task he would likely have persevered to complete it on his own despite it becoming increasingly challenging. 2.3 THIRD ENGINEER’S ACTIONS It is likely that the third engineer became aware of a fuel leak through the smell of diesel in the engine room as there was no evidence of any fuel system or bilge alarms on the engine room data logger. Access covers in the engine room floor plates had been lifted, which suggests that he conducted a search of the area to find a diesel leak. It is apparent that he found the defective fuel pipe beneath the floor plates adjacent to No.2 generator. Tools and equipment had been systematically prepared to carry out a repair from which it is concluded that he had decided to take autonomous action to repair the failed fuel pipe. Although it was both required (chief engineer’s standing orders and SMS Engine Room Procedure AE09 Lone Working in the Engine Room) and expected as good practice, on this occasion the third engineer informed neither the chief engineer nor the bridge OOW of a problem. The master’s standing orders also stated a requirement for risk assessments and permits to work to be completed. By acting alone, without any other members of the crew being aware of his intentions, the third engineer compromised both his own and the rest of the crew’s safety.
33 Had the third engineer informed the chief engineer and/or bridge OOW of the situation and his intended action, or had there been another watchkeeper in the engine room, it is probable that a discussion and some form of dynamic risk assessment would have been conducted. His omission in not informing the chief engineer or bridge OOW is likely to have been influenced by the onboard culture of routine lone working and absence of regular and frequent communication. The apparent initial repair attempt may be rationalised through the third engineer’s experience and positive attitude to prompt remedial action. At first glance, it could have appeared to be a relatively quick and straightforward task to release the hoop bracket and to slide a hose clip along the pipe to cover the hole. However, to access the hoop bracket retaining nuts, the third engineer would have needed to stand in the bilge adjacent to the pipe run. He would have been in very close proximity to the leak and would almost certainly have been soaked in fuel from the spray created by the leak. Notwithstanding this, once the extent of fretting had been uncovered, the realisation that a hose clip and rubber jointing would not suffice should have been apparent and ought to have prompted a review of his intentions. His apparent decision to use an angle grinder to cut the pipe support stanchion is therefore more difficult to rationalise as once the securing bracket had been freed it would have been relatively easy to pull the pipe away from the stanchion in order to fit a hose clip. Despite the lack of direct guidance in respect of angle grinders and hot work, given his experience, the third engineer ought to have recognised the extreme risk of using any tool capable of generating sparks in close vicinity to atomising fuel, causing him to review his intended actions. During the fuel pipe testing following the accident, using a screwdriver to simulate the position of the hoop bracket indicated that the diesel spray leaving the hole in the pipe and impacting on the defective hoop bracket and surrounding structure would have atomised to a degree likely to have resulted in a readily ignitable fuel source. The examination of the angle grinder showed that the operating switch contacts were open. This finding, along with the positioning of the grinder, suggest that it is likely to have been placed in its resting position as a deliberate act by the third engineer. The witness mark on the pipe support bracket matched the width of the angle grinder disc, indicating that the tool had been used as part of the third engineer’s apparent repair attempt. In reviewing the task, the third engineer would have been aware that isolating the fuel system would have involved stopping the main engine which, in turn, would have interrupted the loading programme. Once he had reached this critical point in the event, it might have been his professional pride and confidence in his ability to successfully complete the repair that drove him to carry on with the task. 2.4 LONE WATCHKEEPING Arco Avon was certified for UMS operations, but at the time of the accident the engine room was in a manned condition with a single engineer in attendance. SMS Engine Room Procedure AE09 Lone Working in the Engine Room mandated the use of the UMS patrol alarm whenever a lone worker or watchkeeper was in the engine room. These instructions were compliant with the vessel’s safe manning document and with the guidance available in COSWP (section 15.9.1).
34 The requirement to use the patrol alarm was acknowledged by the vessel’s crew. However, it was deemed an impractical tool to cover the periods when the engine room was manned by a lone watchkeeper. The use of telephone or radio to keep the bridge OOW informed of the watchkeeper’s location was a more normal procedure. This system was recognised within the SMS but only for periods when the patrol alarm was out of service. Given the routine, rather than exceptional, practice of not using the patrol alarm, the requirement to communicate with the bridge OOW at not more than 15-minute intervals had been allowed to lapse, as evidenced by the lack of communication on this occasion from 2124, nearly 2 hours prior to the accident. As noted during the Norsea investigation (section 1.12), the practice of operating machinery spaces with a lone watchkeeper not only risks a loss of contact in a potentially hazardous environment, but it also encourages an individual to act autonomously. With no local co-worker to challenge an individual’s actions, the risks of commencing and subsequently compounding hazardous activities are exacerbated. In the case of Arco Avon, there was a specific requirement, mandated through the chief engineer’s standing orders, that during loading operations the duty engineer was to progress routine duties and conduct planned maintenance while on watch. This instruction effectively condoned lone working and wasnot consistent with the guidance contained in section 15.9.1 of COSWP or with similar guidance now provided in the Code of Safe Working Practices for Merchant Seafarers 2015 edition. The patrol alarm was designed specifically for unmanned operations. It allowed the on-call engineer to investigate alarms or conduct machinery space inspections while maintaining a form of contact. However, it is not a suitable system to allow a watchkeeper to perform maintenance tasks during their period of duty. 2.5 SOURCE OF IGNITION The fire scene investigation revealed extensive heat and smoke damage in the vicinity of the failed fuel pipe. Two potential sources of ignition were considered: the running No.2 generator, which was adjacent to the defective fuel pipe, and sparks generated through use of the portable angle grinder. The exhaust pipe on No.2 generator was at the top of the engine and ran along its outboard side. This was the component on the generator most likely to have been a source of sufficient heat to ignite a diesel spray. However, the flame spread pattern on the side of the generator indicated that the fire had started at the base of the engine and had spread up its side towards the exhaust system. Furthermore, the fuel pipe testing following the accident indicated that the diesel spray from the defective pipe would have been directed away from the generator and into the engine room bilge. Therefore it was concluded that the generator was unlikely to have provided the ignition source. The location of the angle grinder and the witness mark on the fuel pipe support stanchion provided strong evidence that the angle grinder had been used during the third engineer’s apparent repair attempt. The fuel pipe testing demonstrated that an atomising spray of fuel would have resulted as the fuel impinged on the hanging hoop bracket and adjacent engine room structure. This, coupled with the findings of
35 HSE’s Research Report 222 (Annex A), led to the conclusion that the high energy sparks from the portable angle grinder were the probable source of ignition for the fire. 2.6 ABRASIVE WHEELS AND HOT WORK The use of angle grinders for both cutting and grinding is commonplace on board ships. They are exceptionally versatile tools, well suited to general repair work both within and outside of an engine room. It is widely accepted that the sparks generated by abrasive wheels during grinding and cutting operations contain sufficient energy to ignite flammable substances. Therefore, both grinding and cutting processes constitute hot work and should be treated as such. Furthermore, there are a number of documented fires in shore-based industries that have been caused as a result of using angle grinders. Guidance relating to hot work and use of abrasive wheels on board UK registered ships is readily available in COSWP. However, in its current form, the Code could be misinterpreted as not recognising grinding as a hot work activity. COSWP defines hot work as welding and flame cutting, but makes no specific mention of cutting and grinding using abrasive wheels. Conversely, the section relating to abrasive wheels concentrates on the hazards associated with disc and wheel failures, but does not identify flammability hazards related to the generation of sparks. The evidence from this and other accidents, coupled with research findings, clearly indicate that the sparks generated by using fixed and portable angle grinders produce a hot work hazard. However this is not currently acknowledged in marine industry guidance. 2.7 PERSONAL PROTECTIVE EQUIPMENT During the evidence gathering phase of the investigation it was noted that, despite the change in company policy relating to the provision of cotton coveralls, the majority of engineers on HAML vessels continued to wear polyester/cotton high-visibility coveralls. MSN 1731 (M+F) (Annex B) stated that for Work in engine rooms or any area where there is a risk of fire the PPE provided should be Overalls made of fabric of low flammability. The MSN gave the examples of natural fibre, high cotton content and non-flammable clothing. However, it did not quote a standard to indicate suitability and fitness for purpose. The limited flame spread test carried out on sample garments during this investigation and the HSE study into ignition and flame spread of fabrics subject to angle grinder sparks demonstrated that cotton coveralls, on their own, do not offer suitable protection against ignition and flame spread. The fact that coveralls of ‘high cotton content’ were listed in MSN 1731 (M+F) as suitable for use in engine rooms as a protection against fire is a significant concern. This might have led to an unfounded confidence that a cotton garment would provide a recognised level of fire protection. Notwithstanding the findings in relation to the properties of cotton coveralls, even fabric with an FR finish is likely to ignite and continue to burn after being soaked with diesel. The presence of atomised fuel coupled with the wicking effect of a diesel- saturated coverall resulted in an extremely flammable garment that could be readily ignited by the introduction of sparks generated from the use of an angle grinder.
36 2.8 EMERGENCY RESPONSE Following activation of the fire alarm, Arco Avon’s crew mustered quickly and the decision-making process was generally well considered and appropriate. However, the uncoordinated approach to the engine room by the members of the fire team led to the second engineer becoming separated from the fire team AB. The lack of co-ordination was the direct result of the two firefighters dressing in widely separated locations and no re-muster and briefing from the fire team controller (chief officer) before deployment. A further concern was that both the chief engineer and the second engineer opened different access doors to the engine room while alone and without any fire-fighting medium for protection. Had the two doors been opened simultaneously, a through draught could have introduced additional oxygen, causing the fire to burn more intensely. The second engineer was new to the vessel and his lack of familiarity with its layout might explain why he became separated from the fire team AB. However, neither he nor the chief engineer should have attempted to open an engine room access door until the fire team were assembled with the appropriate equipment and had been fully briefed on their required actions. Re-entry of a closed compartment containing a confirmed or suspected fire is an extremely hazardous activity that requires comprehensive planning and a co-ordinated approach. Current entry protocols for a machinery space fire are for the BA team to be ‘on air’ and equipped with a charged fire hose, and for them to initially crack open the door approximately 10cm for 10s to ascertain the conditions within the compartment before proceeding. In his role of on-scene commander, the chief engineer should have taken control at the scene and directed the fire team to attempt the investigation following a thorough assessment of boundary conditions. Once the decision to use the CO2 fixed fire-extinguishing system had been made it was important to activate the system rapidly. The sooner the system could be operated, the more effective it was likely to be. That the second engineer had become separated from the fire team AB delayed a full headcount from being achieved, which consequently delayed the master’s approval to activate the system. Having operated the CO2 system from the control cabinet, the chief engineer’s decision to confirm the successful activation of the system from the cylinder room, was entirely appropriate. On entering the room, he discovered that 50% of the cylinders had failed to operate, and so manually opened the remaining cylinders to complete the system discharge. The reason why many of the cylinders had not operated remotely could not be established. Once the CO2 system had been operated, checking the cylinder room should have been a controlled operation with the room being treated as an enclosed space. There was a significant risk that CO2 would have escaped into the cylinder room and thus depleted the oxygen content of the atmosphere. Unless the atmosphere inside a CO2 cylinder room can be confirmed as safe, BA must be used when entering the room or the initial emergency could be compounded with additional casualties. Following operation of the CO2 system, containment through boundary cooling using the emergency fire pump and temperature monitoring was competently implemented and maintained.
37 2.9 MEDICAL TREATMENT The first-aid treatment given to the third engineer immediately following his evacuation from the engine room was rudimentary. It was not until an RNLI paramedic arrived that care, commensurate with the extent of his injuries, was instigated. Although Arco Avon’s master’s standing orders required the OOW to administer first-aid treatment, care of the third engineer was left to the cook. While the cook had undertaken elementary first-aid training, it would not have prepared him to deal with a casualty in such a serious condition. MGN 482 (M) Maritime Labour Convention, 2006: Medical Care reiterates that The Merchant Shipping (Training and Certification) Regulations 1997 require all deck officers to be trained in medical first-aid or medical care. Furthermore, as confirmed in Arco Avon’s master’s standing orders, the Merchant Shipping Act 1995 gives the master responsibility for ensuring that medical treatment is given either by him or under his supervision. All of the crew were shocked by the extent of the injuries to the third engineer, and it is concluded that this contributed significantly to the low level of medical care administered by them. The published guidance available on board was not referred to as treatment was left entirely to the cook, who did not have ready access to the SCMG. Given the current SCMG guidance that cooling of extensive burns (>15%) should be avoided as hypothermia will result, reference to it might not have prompted any cooling of the third engineer’s burns. Without cooling, the extent and consequent effect of the burns would have continued to increase for a significant time. Independent medical advice suggests that cooling is effective for up to 3 hours but most effective in the first 30 minutes. While cooling of extensive burns may risk inducing hypothermia, this could be managed by selectively cooling individual areas while maintaining body temperature through the use of clean dry blankets or clothing and, where possible, operating in a heated compartment. In this case, the severity of the injuries was such that any action by the crew was unlikely to have saved the third engineer. 2.10 MAINTENANCE AND SURVEY Inspection of the fuel system pipework following the accident revealed that the fuel leak had been the result of fretting caused by relative movement between the pipe and one of the hoop brackets. The fretting had resulted in a deep groove around approximately 50% of the pipe’s circumference and a 2mm diameter hole at the bottom of the pipe. The condition of the defective pipe was consistent with other pipes located beneath the engine room floorplates. HAML’s PMS recorded both planned and breakdown maintenance. However, there were no specific tasks within the system for inspection of the low pressure fuel system. The vessel was classed with BV and had been subject to surveys every year since build. While BV’s guidance to surveyors included notes relating to the fuel system, no defects or anomalies had been noted in respect of Arco Avon. The IMO had recognised that inspection of the fuel system was an important element of fire prevention. IMO circular MSC.1/Circ. 1321, dated 11 June 2009, was issued to provide guidelines for measures to prevent fires in engine rooms and cargo pump
38 rooms. This circular, the contents of which had not been promulgated by the MCA to the shipping industry, recommends a 6-monthly inspection of all low pressure fuel system components to be included in the vessel’s SMS. The majority of the pipe runs forming the main engine low pressure fuel system were located beneath the floor plates in Arco Avon’s engine room and were not readily accessible for inspection or survey. The layout of the pipework allowed flanges from one pipe to come into contact with another, resulting in wear due to fretting. More damaging were the system’s steel hoop brackets used to clamp the pipes against their support posts. These brackets were not fitted with any form of packing between the pipe and bracket. Vibration associated with the normal operation of the vessel and possible vibration induced by pressure pulses within the system allowed the brackets to loosen. The combination of vibration and material loss through corrosion resulted in loosening of the brackets in service, with some failing completely. The loose brackets then allowed relative movement between the materials, resulting in fretting of the pipework. On examination following the accident, the condition of the low pressure fuel system pipes was generally found to be poor and not commensurate with the overall material condition of the engine room. The lack of a requirement in HAML’s PMS for fuel system pipework inspections to form part of the vessel’s routine maintenance was compounded by the discretionary nature of BV’s survey of fuel system pipework, and this allowed defective pipework below the engine room floor plates to go undetected. 2.11 SAFETY MANAGEMENT SYSTEM The auditor who issued Arco Avon’s SMC on 27 May 2015 noted that there was a comprehensive system in place for risk assessments and PTWs. However, the SMS did not contain any risk assessments relating to hot work procedures involving grinding or cutting activities using abrasive wheels. While there were extensive records of completed PTWs, none of them referred to a risk assessment, either generic or task specific, contrary to the master’s standing orders that a risk assessment was to be generated prior to any job being carried out. While HAML’s SMS provided a tool to support its vessels in operating in a safe and consistent manner, operational inconsistencies on board Arco Avon were not detected by the vessel’s shore management team. There appears to have been no challenge during internal audits in relation to particular anomalies between direct instruction (standing orders) and safe systems of work (e.g. regularity and frequency of communications with engine room staff, and the use and coupling of risk assessments and PTWs). This suggests that while HAML operated an SMS that was compliant with the ISM Code, the practical application of the SMS was deficient in some areas.
39 SECTION 3 - CONCLUSIONS 3.1 SAFETY ISSUES RELATING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS
Although required by Arco Avon’s chief engineer’s standing orders and elsewhere in the vessel’s SMS, the third engineer informed neither the chief engineer nor the bridge OOW of a fuel leak and his apparent intended action to repair it. His reason for not doing so is likely to have been influenced by the onboard culture of routine lone working and absence of regular and frequent communication. [2.3]
The UMS patrol alarm was deemed on board Arco Avon to be an impractical tool to cover the periods when the engine room was manned by a lone watchkeeper. [2.4]
Given the routine, rather than exceptional, practice of not using the patrol alarm, the vessel’s SMS requirement to communicate with the bridge OOW at not more than 15-minute intervals had been allowed to lapse. [2.4]
Arco Avon’s chief engineer’s standing orders requiring the duty engineer to progress routine duties and conduct planned maintenance while on watch, effectively condoned lone working and was not consistent with the guidance provided in section 15.9.1 of COSWP or with similar guidance now provided in the Code of Safe Working Practices for Merchant Seafarers 2015 edition. [2.4]
From the results of fuel pipe testing following the accident and the findings of HSE Research Report 222, it is concluded that high energy sparks from the portable angle grinder were the probable source of ignition for the fire. [2.5]
The fact that sparks generated by using fixed and portable angle grinders produce a hot work hazard is not currently acknowledged in marine industry guidance. [2.6]
The presence of atomised fuel coupled with the wicking effect of a diesel-saturated coverall, regardless of the fact that the third engineer was not wearing a coverall of 100% cotton, resulted in an extremely flammable garment that could be readily ignited. [2.7]
A combination of vibration and fuel pipe support bracket material loss through corrosion had resulted in loosening of the brackets in service and consequent fretting of the pipework. The fretting had resulted in a hole in a low pressure fuel pipe located below the engine room floor plates. [2.10]
The contents of IMO circular MSC.1/Circ.1321, which recommends a 6-monthly inspection of all low pressure fuel system components to be included in the vessel’s SMS, had not been promulgated by the MCA to the shipping industry. [2.10]
The lack of a requirement in HAML’s PMS for fuel system pipework inspections to form part of the vessel’s routine maintenance was compounded by the discretionary nature of BV’s survey of fuel system pipework, and allowed defective pipework below the engine room floor plates to go undetected. [2.10]
While HAML’s SMS provided a tool to support vessels in operating in a safe and consistent manner, operational inconsistencies on board Arco Avon were not detected by the vessel’s shore management team. [2.11]
40 3.2 OTHER SAFETY ISSUES RELATING TO THE ACCIDENT7
The third engineer’s apparent initial repair attempt may be rationalised through his experience and positive attitude to prompt remedial action. However, his apparent decision to then use an angle grinder to cut the pipe support stanchion is more difficult to rationalise. [2.3]
The third engineer would have been aware that isolating the fuel system would have involved stopping the main engine which, in turn, would have interrupted the loading programme. It might have been his professional pride and confidence in his ability to successfully complete the repair that drove him to carry on with the task. [2.3] 3.3 OTHER SAFETY ISSUES THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS
The fact that coveralls of ‘high cotton content’ were listed in MSN 1731 (M+F) might have led to an unfounded confidence that a cotton garment would provide a recognised level of fire protection. [2.7]
An uncoordinated approach to the engine room led to the fire team being separated and was a direct result of the two firefighters dressing in widely separated locations with no re-muster and briefing from the fire team controller before deployment. [2.8]
The chief engineer and second engineer opened different access doors to the engine room while alone and without any fire-fighting medium for protection. Had the two doors been opened simultaneously, a through draught could have introduced additional oxygen causing the fire to burn more intensely. [2.8]
Following activation of the CO2 fixed fire-extinguishing system, the chief engineer entered the CO2 cylinder room without wearing BA and without first checking and confirming the atmosphere inside the room as safe. [2.8]
Contrary to Arco Avon’s master’s standing orders, medical care of the third engineer was left to the cook, who had not received the level of training to prepare him to deal with a casualty in such a serious condition. However, the severity of injuries was such that any action taken by the crew was unlikely to have saved the third engineer. [2.9]
Current SCMG guidance that cooling of extensive burns (>15%) should be avoided as hypothermia will result, is not consistent with independent medical advice received by the MAIB following the accident. [2.9] 3.4 OTHER SAFETY ISSUES7
The practice of operating machinery spaces with a lone watchkeeper not only risks a loss of contact in a potentially hazardous environment, but it also encourages an individual to act autonomously. With no local co-worker to challenge an individual’s actions, the risks of commencing and subsequently compounding hazardous activities are exacerbated. [2.4] 7 These safety issues identify lessons to be learned. They do not merit a safety recommendation based on this investigation alone. However, they may be used for analysing trends in marine accidents or in support of a future safety recommendation
41 SECTION 4 - ACTIONS TAKEN The Maritime and Coastguard Agency has taken actions to review and update: • The Code of Safe Working Practices for Merchant Seafarers to address the hot work hazard of sparks generated by the use of fixed and portable angle grinders. • Merchant Shipping Notice 1870 (M+F) to introduce an appropriate standard for overalls for work in engine rooms or any area where there is a risk of fire. • The Ship Captain’s Medical Guide to provide clear guidance on the appropriate medical treatment for serious burns. Hanson Aggregates Marine Limited has issued: • Fleet Directive E363 detailing amendments to personal protective equipment requirements on its vessels. • Fleet Directive M33 requiring fleet-wide inspection of fuel systems. • Fleet Directive M34 requiring fleet-wide inspection of high temperature surface insulation and spray shields.
42 SECTION 5 - RECOMMENDATIONS The Maritime and Coastguard Agency is recommended to: 2016/136 Review International Maritime Organization circular MSC.1/Circ.1321 – Guidelines for measures to prevent fires in engine-rooms and cargo pump-rooms, and, as appropriate, promulgate its contents to the shipping industry. Hanson Aggregates Marine Limited is recommended to: 2016/137 Review and, as appropriate, amend its safety management system to ensure: • Its planned maintenance system includes a 6-monthly inspection of all low pressure fuel system components, as recommended in IMO circular MSC.1/Circ.1321. • Manning levels, watchkeeping duties and communication procedures provide for safe engine room operations at all times. • Portable angle grinding is included and addressed as a hot work activity. • Fire-fighting training is enhanced to address and correct re-entry techniques. • A procedure is included for entering the CO2 cylinder room following system activation. • Improved oversight by shore management to identify operational inconsistencies, particularly with regard to the use of risk assessments and permits to work. • The master’s role and responsibilities, when dealing with medical casualties, is reinforced. Bureau Veritas is recommended to: 2016/138 Advise its surveyors of the contents of IMO circular MSC.1/Circ.1321 – Guidelines for measures to prevent fires in engine-rooms and cargo pump-rooms. Safety recommendations shall in no case create a presumption of blame or liability
Marine Accident Report
FD06047 | 2016_英国_flooding-and-sinking-of-the-wooden-potter-majestic__MAIBInvReport_16_2016.pdf
分类:06_境外及港澳台调查报告 | 年份:2016 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
M A R I N E A C C I D E N T I N V E S T I G AT I O N B R A N C H VERY SERIOUS MARINE CASUALTY REPORT NO 16/2016 JULY 2016 1 Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of such an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2016 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. All reports can be found on our website: www.gov.uk/maib For all enquiries: Email: maib@dft.gsi.gov.uk Tel: 023 8039 5500 Fax: 023 8023 2459 ACCIDENT REPORT Foundering of fishing vessel Majestic (LK678) 5 nautical miles off Yell, Shetland 21 January 2016 SUMMARY At 14431 on 21 January 2016 the 16m wooden potter Majestic (LK678) sank close to a gas pipeline off the Point of Fethaland, Shetland. The vessel’s sinking resulted from a flood in the engine room that had started sometime between 0900 and 1000. The skipper and crewman abandoned into a liferaft shortly after they became aware of the ingress of water and were rescued by a nearby fishing vessel. No efforts were made to stem the flood and the vessel foundered approximately 4 hours after it was abandoned. There were no injuries and no pollution. The pipeline’s owner, British Petroleum, later arranged for sandbags to be placed on the seabed between it and the wreck to prevent damage to the pipeline. 1 All times are UTC. Majestic Image courtesy of Mike Pennington
2 The cause of the engine room flood is unknown but it was probably caused by a failure within a seawater system or sea valve. The investigation identified that: • The engine room’s bilge alarms sounded in the wheelhouse and were not heard by the skipper and the crew who were working on the deck. Consequently, the engine room had been flooding for up to 1 hour before the crew were alerted. • The rate of the flooding would have been slowed by the operation of the electric bilge pump and possibly by stopping the main engine. • The effectiveness of the crew’s response to the flood was probably reduced because they did not routinely conduct emergency drills. • The prompt abandonment and notification to the coastguard and vessels in the area reduced the risk to the lives of the crew. This accident indicates that relevant guidance and the lessons from similar accidents were not being sufficiently heeded. In the accident, Majestic’s wheelhouse was left unattended for a prolonged period and the crew were not practised in reacting to a flood on board. In addition, they did not wear personal flotation devices while working on deck and did not don lifejackets when abandoning the vessel. A recommendation made to Majestic’s owners is aimed at improving the safe operation of any vessels they may own or operate in the future. FACTUAL INFORMATION Narrative At 0530 on 21 January 2016, the 16m wooden potter Majestic (LK678) sailed from Toft, Shetland, and headed for fishing grounds approximately 5nm to the north-east of Point of Fethaland (Figure 1). On board were the vessel’s skipper and a crewman; both men were wearing oilskin trousers and jackets. The weather was fine and clear and the visibility was good. There was a moderate south-easterly breeze and the sea was slight with a 1m swell. Majestic reached the fishing grounds at about 0630. Over the next 3½ hours, the skipper and the crewman worked three fleets of creels. This involved hauling, emptying, re-baiting, re-shooting the creels and processing the catch of brown crab. The hauler and its associated hydraulics were operating, which made it very noisy on the deck. During this period, other than when manoeuvring the vessel between the fleets, the wheelhouse was left unattended. Each fleet of creels took approximately 1 hour to process. At about 1000, the skipper went to the wheelhouse and heard the engine room’s bilge alarms sounding. He opened a forward wheelhouse window and shouted to the crewman on the deck below to check the engine room for flooding. Accordingly, the crewman lifted the engine room escape hatch (Figure 2). The skipper leant out of the wheelhouse window and he and the crewman saw that the engine room was flooded. The water level was above the deck plates, half way up the side of the engine casing. The skipper and the crewman immediately went to the wheelhouse roof and launched the liferaft. The skipper then returned to the wheelhouse and, at 1010, he pressed the very high frequency (VHF) digital selective calling (DSC) distress alert. He also broadcast a “Mayday” via VHF radio, channel 16. The DSC distress message was received by the Shetland Coastguard Operation Centre (CGOC) and the nearby fishing vessels Fairway II (LK270) and Kestrel (LK268). The coastguard watch officer was
3 Figure 1: Yell sound fishing grounds (inset: Orka gas pipeline and position of sinking Reproduced from Admiralty Chart BA 1239 by permission of the Controller of HMSO and the UK Hydrographic Office. Fishing grounds Point of Fethaland Toft Position flood discovered Gas pipeline Final position of Majestic
4 Liferaft stowage Engine compartment escape hatch Work bench and hauler Vivier tank flush deck opening Liferaft stowage Work bench and hauler Cabin Engine compartment Engine compartment escape hatch Vivier tank For’d hold Figure 2: Vessel layout
5 unable to acknowledge the message due to a technical fault but he quickly established contact with Majestic’s skipper on VHF radio, channel 16. Fairway II and Kestrel were 4nm and 3.4nm respectively from Majestic; Fairway II immediately started to close to assist and Kestrel’s fishing gear was hauled. Majestic’s skipper informed the coastguard that the vessel was sinking due to a flood in the engine room. He also advised that it was too dangerous to go into the compartment and that he intended to abandon into a liferaft. The coastguard watch officer advised the skipper to take with him a hand-held VHF radio and the vessel’s Emergency Position Indicating Radio Beacon (EPIRB). The watch officer also tasked rescue helicopter R900, which was on a training exercise in the area. The Aith and Lerwick all-weather lifeboats (AWL) were not tasked due to their distance from Majestic, an assessment that the vessel was sinking quickly and the relatively close proximity of R900, Fairway II and Kestrel. On leaving the wheelhouse, Majestic’s skipper took a hand-held VHF radio and his mobile phone, but he did not collect the EPIRB. At about 1017, the skipper and the crewman boarded the liferaft; neither wore a lifejacket. The men cut the liferaft painter and then paddled the liferaft clear of Majestic. Majestic’s engine was running but it was not in gear. At about 1022, R900 arrived on scene soon followed by Fairway II. At 1033, Majestic’s skipper and crewman were recovered from the liferaft onto the fishing vessel (Figure 3). Majestic remained upright and on an even keel (Figure 4) and over the next 4½ hours the vessel drifted towards the Orka Vow gas pipeline to the north (Figure 1 inset); Fairway II and Kestrel were in attendance. Shetland CGOC informed British Petroleum (BP), the pipeline’s owners, of the situation and, at 1333, the coastguard also discussed the possibility of taking Majestic in tow with Fairway II’s skipper. However, Fairway II’s skipper considered it too dangerous to put anyone on board. At about 1440, Majestic heeled to port and trimmed by the stern. It sank 3 minutes later in a depth of 100m. The vessel’s EPIRB released and activated and was recovered by Kestrel’s crew. Post-foundering actions A 500 metre temporary exclusion zone was established over the site of Majestic’s wreck and BP deployed a guard vessel to the area. A remotely operated vehicle (ROV) survey identified that Majestic had settled on the seabed 2 metres from the gas pipeline; the vessel was heeling towards the pipeline. As a precaution, the ROV was used to place large sandbags between Majestic and the pipeline to prevent the wreck from toppling (Figure 5). Crew Majestic’s skipper (aged 34) and the crewman (aged 35) were brothers and had been fishermen all their working lives. They had co-owned Majestic since 2012 and crewed the vessel themselves. Other crewmen had occasionally been employed to assist but recruitment and retention of fishermen was difficult due to competition from the oil and gas industry. The skipper held a Seafish2 under 16.5m skipper certificate3 and the crewman held a fishing vessel class 1 Certificate of Competency (CoC) as well as a fishing vessel engineer class 2 CoC. Both men had completed the mandatory Seafish training courses4. Neither the skipper nor the crewman usually wore lifejackets when working on deck. They also did not routinely conduct emergency drills. 2 Seafish – the Sea Fish Industry Authority works across all sectors of the UK seafood industry to promote good quality and sustainable seafood, and to improve the safety and standards of training for fishermen. 3 The under 16.5m skippers’ certificate is a voluntary qualification administered by Seafish aimed at increasing the navigational and engineering knowledge of skippers and watchkeepers on small fishing vessels. 4 New entry fishermen must complete basic safety courses in sea survival, elementary first-aid; fire-fighting and health and safety. Fishermen with two years’ experience must also complete a 1-day mandatory safety awareness course run by Seafish.
6 Figure 3: Majestic’s crew recovered by Fairway II Figure 4: Majestic at 1036
7 Construction Majestic was built in 1977 to a traditional wooden design with oak frames and iroko planking. The vessel complied with The Fishing Vessels (Safety Provisions) Rules 1975 and comprised three main internal compartments: fish hold (that contained a vivier5 tank), engine room and accommodation (Figure 2). The vessel’s bulkheads were not required to be watertight but the bulkhead between the fish hold and the engine room was required to be of solid and substantial construction. The bulkhead between the engine room and the accommodation, and the engine room deck head were steel and met the B15 fire rating standard6. 5 The vivier tank was a holding tank with a capacity of approximately 12t that was used to keep shell fish alive. Pumps maintained a continuous supply of fresh sea water to the tank, the level of which was controlled by an overflow system that discharged excess water overboard. 6 A bulkhead or deck head constructed of non-combustible material with an insulation value that ensures the average temperature of the unexposed side to a fire will not rise more than 140°C above the original temperature, nor will the temperature at any one point, including any joint, rise more than 225°C above the original temperature within 15 minutes. Figure 5: Sandbags positioned against the wreck
8 Seawater inlets and discharges overboard The table below summarises Majestic’s seawater inlets and discharges and the status of the associated machinery at the time of the flood: Engine Room Inlets / Discharges Inlet System Discharge Running 50mm (S) Main Engine cooling water 50mm (P) Yes Gearbox cooling water (supplied from engine cooling water) 40mm (P) Yes 40mm (P) Vivier Tank circulating pump Unknown Yes 50mm (P) 13m3 /hr Deck Wash / bilge pump 50mm (S)
Yes
11m3 /hr Electric Engine / Room bilge pump 30mm (P)
No
Hand operated Engine Room bilge pump 60mm (S) No
Other discharges
11m3 /hr Electric Fish Hold bilge pump
No
6m3 /hr Electric Accommodation bilge
No
Hand operated Fish Hold bilge pump No (P) = Port side, (S) = Starboard side Bilge pumps and alarms Majestic was fitted with four power driven-bilge pumps: two in the engine room, one in the fish hold and one in the accommodation. Hand-operated bilge pumps were also fitted in the engine room and the fish hold and a portable engine-driven salvage and fire pump was carried on board. The engine room bilge pumps comprised one electric pump and one engine-driven pump with rated capacities of 11m3 and 13m3 per hour respectively. The bilge pumps in the fish hold and accommodation were also electric-powered with rated capacities of 11m3 and 6m3 per hour respectively. The on/off switches for the electric bilge pumps were located on a panel in the wheelhouse. Two bilge water level detectors were fitted in Majestic’s engine room; a ‘high’ level and a ‘low’ level. Bilge water level detectors were also fitted in the accommodation and the fish hold. Both the visual and aural alarms associated with the water level detectors were located in the wheelhouse. The engine room bilges were routinely pumped three or four times each day to remove accumulated water. The crew had not identified why this water had been accumulating. Surveys and maintenance The Maritime and Coastguard Agency (MCA) surveyed Majestic in 2012 after the vessel had grounded. The attending surveyor noted that repair was required to planking on the vessel’s sides and internal stiffeners. Other than that the vessel’s stability book was not on board at the time of the survey, no further deficiencies were identified. The MCA also completed a United Kingdom Fishing Vessel Certificate renewal survey on board Majestic on 17 August 2013 in Macduff shipyard, Scotland. During the survey, all sea valves were removed and were found to be in a satisfactory condition, as was the vessel’s non-ferrous seawater pipework. However, survey of the hull identified that extensive caulking was required in way of the forefoot.
9 The surveyor noted that routine drills were not recorded on board. A fire drill and an abandon ship drill were conducted during the survey. Lifejackets were worn for the abandon ship drill; Majestic carried six abandon ship lifejackets and four inflatable personal flotation devices (PFD). In April 2014, Majestic was taken out of the water for routine maintenance. The work carried out included: • Caulking and painting of the hull • Servicing of machinery • Replacement of the vivier tank. ANALYSIS Flooding mechanism It is evident that the flood into Majestic’s engine room started between 0900 and 1000 when the wheelhouse was unattended. That only the bilge alarms for the engine room were sounding when the skipper returned to the wheelhouse, indicates that, by then, the floodwater had not spread to a significant level in the fish hold or the accommodation. The source of the floodwater in Majestic’s engine room is unknown. Water ingress into the engine room bilges was a regular occurrence that required the bilges to be pumped frequently. However, this was probably due to degraded caulking in the vessel’s iroko planking. It is difficult to keep vessels made of iroko watertight as the wood is very hard and the caulking between planks quickly loses integrity. It is calculated that Majestic would have required to take on board 100m3 of water in order to lose stability. Therefore, as the vessel survived for between approximately 4 hours 40 minutes and 5 hours 40 minutes after the flooding started, the flooding rate must have been between 17.5 and 21m3/hr. This rate of water ingress was significantly higher than usual. Therefore, it was almost certainly due to a material failure of pipework or a seal on one of the engine room’s seawater systems connected to seawater inlets or discharge overboard valves, rather than the loss of caulking. Safety-critical alarms MGN 313(F)7 states that the wheelhouse must not be left unattended at any time, primarily to ensure that a proper lookout is maintained and that a vessel is navigated safely. However, the equipment installed in fishing vessels’ wheelhouses is not usually limited to navigation equipment and propulsion and steering control systems. Safety-critical alarms, such as fire and bilge-level alarms, are also fitted. Therefore, if a wheelhouse is left unattended, the risk of these alarms going unnoticed is significantly increased. On board Majestic, the purpose of the automatically activated bilge alarms was to provide the crew with an early notification of a flood. However, both the skipper and the crewman were working on deck and did not hear the bilge alarms over the noise of the deck hydraulics and machinery. As a result, the flood went unnoticed for up to 1 hour. Had the skipper and the crewman been alerted as soon as the bilge alarms sounded, the likelihood of them being able to enter the engine room to turn on the motor- driven bilge pump, and to identify and resolve the source of the water ingress would have increased significantly. Despite the guidance in MGN 313 (F) and numerous investigation reports, it is still common practice for fishing vessel wheelhouses to be left unattended. In the last year, the MAIB has published two reports into the loss of two vessels primarily because their wheelhouses were unmanned: the collision between 7 Keeping a Safe Navigational Watch on Fishing Vessels.
10 Good Intent (SY79) and Silver Dee (B310);8 and the fire and foundering of Karinya (FR699)9. In the latter case, the fire alarm in the wheelhouse could not be heard by the skipper, who was on deck operating winch controls. The desire to minimise manpower costs and the reported difficulties in recruiting fishermen often result in minimum crewing that makes it likely that the wheelhouses on board many fishing vessels will be left unattended during certain phases of the fishing process. In view of the need to maintain a safe navigational watch, such a situation cannot be condoned. However, as leaving wheelhouses unattended for short periods is likely to persist, it would be beneficial for safety-critical alarms to be audible throughout a vessel, and not only in the wheelhouse. In this respect, a two stage alarm similar to a navigation watch alarm, in which a general alarm sounds when an initial alarm has not been acknowledged within a defined time period, could be of benefit. Crew response The skipper’s quick decision to abandon ship after seeing the water level in the engine room, the immediate launch of the liferaft and the prompt activation of the DSC backed up by a “Mayday” broadcast, ensured the risk to the lives of the skipper and the crewman was reduced considerably. As a consequence, they were able to abandon Majestic in a controlled and safe manner and external assistance was provided very quickly. However, notwithstanding the skipper’s understandable reluctance to enter the engine room to investigate the source of the flood or to start the motor-driven bilge pump, several actions were not taken that potentially could have delayed the need to abandon and might have prevented the vessel’s loss. Notably, the electric bilge pump was not switched on and the vessel’s main engine was not stopped. With a capacity of 11m3/hr, the operation of the electric bilge pump would have reduced the flooding rate by about 50%. In addition, if, as is possible, the water ingress was caused by a failure connected with the engine’s cooling system, the ingress rate would have probably decreased further as soon as the engine was stopped. Onboard drills A factor that almost certainly reduced the skipper and crewman’s ability and willingness to tackle the flood in the engine room was that they did not routinely carry out emergency drills on board. MSN 1770 (F)10 requires fishing vessel crews to carry out at least one emergency drill each month. Drills are used to rehearse anticipated emergency scenarios, including flooding, and are intended to provide training, reduce confusion, and verify the adequacy of emergency response actions and equipment. The scope of flooding drills that can be conducted on vessels such as Majestic, that have few crew, is limited. Nevertheless, ‘table-top’ discussions covering the actions to take and the equipment available to deal with floods in different compartments would have assisted the skipper and the crewman with the development of ship-specific plans and procedures. Consequently, the importance of operating the electric-driven bilge pump and stopping the engine as soon as a flood in the engine room was discovered, might have been identified. Wearing of lifejackets That the skipper and the crewman did not wear PFDs when working on deck and did not don lifejackets when abandoning is of concern. A more rapid foundering, stumbling when entering the liferaft, or difficulties when deploying the liferaft could easily have resulted in one or both of the men ending up in the sea. 8 Collision between the fishing vessels Silver DeeV (B310) and Good Intent (SY79) resulting in the foundering of Silver Dee, Irish Sea, 29 July 2015, MAIB report 4/2016. 9 Fire and foundering of fishing vessel Karinya (FR 699), Moray Firth 4 October 2015, MAIB report 7/2016. 10 The Fishing Vessels Code of Safe Working Practice for the Construction and Use of 15 metre length overall (LOA) to less than 24 metre registered length (L) Fishing Vessels.
11 Despite the advantages of wearing a PFD when working on the open deck at sea, many fishermen still do not wear them. In 2000 the MAIB made its first recommendation about the compulsory wearing of lifejackets by fishermen working on deck. In the intervening years, there has been a succession of discussions, education programmes and research projects that have had very limited success. Since 2012, European funding has also been used by the various fishing industry associations to provide PFDs to thousands of fishermen free of charge. Despite these initiatives, the culture of the fishing industry has been slow to change, and fishermen continue to drown who might otherwise have lived had they been wearing a PFD when they entered the water. CONCLUSIONS • The flooding was probably caused by a failure within a seawater system inside the engine room. • The engine room had been flooding for up to 1 hour before the crew were alerted. • The engine room’s bilge alarms sounded in the wheelhouse and were not heard by the skipper and the crew who were working on the deck. • The prompt abandonment and notification to the coastguard and vessels in the area reduced the risk to the lives of the crew. • The rate of the flooding would have been slowed by the operation of the electric bilge pump and possibly by stopping the main engine. • The effectiveness of the crew’s response to the flood was probably reduced by not routinely conducting emergency drills. ACTION TAKEN MAIB actions The MAIB has issued a flyer to the fishing industry highlighting the safety issues identified in this report. RECOMMENDATIONS The owners of Majestic are recommended to: 2016/135 Take steps to ensure on any vessel they own or skipper in the future that: • The dangers of leaving the wheelhouse unattended are fully assessed so that practical measures can be adopted to mitigate such risks; • Emergency drills are conducted in accordance with MSN 1770 (F) and; • PFDs are worn by all crew when working on the open deck at sea. Safety recommendations shall in no case create a presumption of blame or liability
12 SHIP PARTICULARS Vessel’s name Majestic Flag United Kingdom Classification society Not applicable IMO number/fishing numbers LK678 Type Potter Registered owner Privately owned Manager(s) Not applicable Year of build 1977 Construction Wood Length overall 16.0 Registered length 15.98 Gross tonnage 51 Minimum safe manning Not applicable Authorised cargo Not applicable VOYAGE PARTICULARS Port of departure Toft Port of arrival Not applicable Type of voyage Coastal Cargo information Not applicable Manning 2 MARINE CASUALTY INFORMATION Date and time 21 January 2016 at 1443 Type of marine casualty or incident Very Serious Marine Casualty Location of incident 60°45’54N, 001°17’01W - 5nm NW of Yell, Shetland Place on board Ship / engine room Injuries/fatalities None Damage/environmental impact Total loss, no significant pollution Ship operation Fishing Voyage segment Mid water External & internal environment Moderate breeze, slight seas with a 1m well, good visibility and fine weather. Persons on board 2
FD06048 | 2016_英国_man-overboard-from-twin-rig-trawler-aquarius-with-loss-of-1-life__MAIBInvReport18_2016.pdf
分类:06_境外及港澳台调查报告 | 年份:2016 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
M A R I N E A C C I D E N T I N V E S T I G AT I O N B R A N C H ACCIDENT REPORT VERY SERIOUS MARINE CASUALTY REPORT NO 18/2016 OCTOBER 2016 Report on the investigation of a fatal man overboard from the fishing vessel Aquarius (BF 89) east of Aberdeen on 17 August 2015
Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2016 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. All MAIB publications can be found on our website: www.gov.uk/maib For all enquiries: Marine Accident Investigation Branch Spring Place 105 Commercial Road Southampton Email: maib@dft.gsi.gov.uk United Kingdom Telephone: +44 (0) 23 8039 5500 SO15 1GH Fax: +44 (0) 23 8023 2459 Press enquiries during office hours: 01932 440015 Press enquiries out of hours: 020 7944 4292
CONTENTS GLOSSARY OF ABBREVIATIONS, ACRONYMS AND TERMS SYNOPSIS 1 SECTION 1 - FACTUAL INFORMATION 2 1.1 Particulars of Aquarius and accident 2 1.2 Narrative 3 1.3 Environmental conditions 9 1.4 Crew 9 1.5 Aquarius 10 1.5.1 General 10 1.5.2 Fishing gear 11 1.6 Crew working patterns 11 1.7 Marking the trawl warps 11 1.8 The rope stopper 13 1.9 The Code of Safe Working Practice for the Construction and Use of 15 to 24 Metre Fishing Vessels 13 1.10 Surveys and inspection requirements 16 1.10.1 Certification process for 15 to 24 metre fishing vessels 16 1.10.2 Annual self-certification 16 1.10.3 Offshore industry guard ship inspections 17 1.11 Survey and inspection performance record 17 1.12 Post-accident inspection 18 1.13 Management of deficiencies 18 1.14 Life-saving appliances 19 1.15 Vessel Safety Management 20 1.15.1 General duties 20 1.15.2 Safety management system 20 1.15.3 Emergency procedures and drills 21 1.15.4 Risk assessments 23 1.15.5 Work equipment inspections 23 1.15.6 Personal protective equipment and working lifejackets 24 1.15.7 Stability 25 1.16 Safe working practices 25 1.16.1 General safety guidance 25 1.16.2 Guidance provided by the International Maritime Organization 25 1.16.3 The Fishermen’s Safety Guide 26 1.16.4 Marine Guidance Notes 26 1.16.5 The Code of Safe Working Practices for Merchant Seamen 26 1.17 Hours of work and rest requirements 27 1.18 Previous incidents on Aquarius and similar accidents 28 1.18.1 Aquarius 28 1.18.2 UK fishing vessel fatal man overboard accidents 29 1.18.3 Annual self-certification 30 SECTION 2 - ANALYSIS 31 2.1 Aim 31 2.2 Overview 31 2.3 The failure of the rope stopper 31
- 4 Working practices on board Aquarius
32 2.4.1 Marking the trawl 32 2.4.2 Standards of general seamanship 33 2.4.3 Leadership and teamwork 34 2.5 Man overboard 34 2.6 Emergency response 34 2.7 Emergency preparedness 35 2.8 The use of personal flotation devices on deck 36 2.9 Effects of tiredness and fatigue 37 2.10 Hours of work and rest 37 2.11 Vessel safety management 38 2.11.1 Vessel’s safety management system 38 2.11.2 Risk assessment 38 2.11.3 Safety culture and its effect on behaviours 39 2.12 Certification process and equipment maintenance 39 2.12.1 Vessel owner’s annual self-certification process 39 2.12.2 Regulatory oversight and the management of deficiencies 40 SECTION 3 - CONCLUSIONS 41 3.1 Safety issues directly contributing to the accident that have been addressed or resulted in recomendations 41 3.2 Safety issues not directly contributing to the accident that have been addressed or resulted in recommendations 41 SECTION 4 - ACTIONS TAKEN 43 4.1 MAIB Actions 43 4.2 Actions taken by other organisations 43 SECTION 5 – RECOMMENDATIONS 44
FIGURES Figure 1
Demersal trawl net arrangement Figure 2a
Stern view of Aquarius Figure 2b
Port trawl warp Figure 3a
Reconstruction of rope stopper applied Figure 3b
Reconstruction of rope stopper trapped in block after warp slackened off Figure 4
Plan view of deck with warp pulled inboard Figure 5
Reconstruction of marking the warp Figure 6
Positions of the deck crew when the stopper failed Figure 7
Track of Aquarius on departing Aberdeen Figure 8
Wheelhouse electronic displays Figure 9
Reconstruction of application of stopper hitch from cleat on port side to the warp Figure 10
Reconstruction of stopper trapped in the gantry block as warp is veered Figure 11
Endless chain available for use on Aquarius Figure 12
Chain stopper applied ANNEXES Annex A
Annang Nuerty (deceased) contract of employment Annex B
MGN 430 (F) – Checks on Crew Certification and Drills Annex C
Annual self-certification declaration form Annex D
Guard Vessel Inspection and Specification Document Annex E
Aquarius documented manoverboard recovery procedure Annex F
Aquarius logbook – muster and training records Annex G
Risk Assessment – General Working on Deck Annex H
Aquarius LOLER record of inspections Annex I
MAIB Safety Flyer
GLOSSARY OF ABBREVIATIONS, ACRONYMS AND TERMS °C
degrees Celsius CoSWP
Code of Safe Working Practices for Merchant Seamen DSC
Digital Selective Calling EPIRB
Emergency Position Indicating Radio Beacon FISG
Fishing Industry Safety Group GMDSS
Global Maritime Distress and Safety System HF
High Frequency IMO
International Maritime Organization ISO
International Organization for Standardization kg
kilogram kt(s)
knot(s) (nautical mile(s) per hour) kW
kilowatt L
Length LOA
Length Overall LOLER
The Merchant Shipping & Fishing Vessel (Lifting Operations and Lifting Equipment) Regulations 2006 LSA
Life-Saving Appliance m
metre MCA
Maritime and Coastguard Agency MF
Medium Frequency MGN
Marine Guidance Note mm
millimetre MOB
Man Overboard MSN
Merchant Shipping Notice N
Newton PFD
Personal Flotation Device PPE
Personal Protective Equipment PUWER
The Merchant Shipping & Fishing Vessel (Provision and Use of Work Equipment) Regulations 2006 RNLI
Royal National Lifeboat Institution
SAR
Search and Rescue
Seafish
Sea Fish Industry Authority SFF
Scottish Fishermen’s Federation SIAS
Ship Inspection And Survey SOLAS
International Convention for the Safety of Life at Sea 1974 t
tonne VHF
Very High Frequency
VTS
Vessel Traffic Services
UKFVC
United Kingdom Fishing Vessel Certificate UTC
Universal Co-ordinated Time Terms The Working Time - The Fishing Industry Code of Practice on Working Standards Code
Time Standards 15-24m FV Code
Code of Safe Working Practice for the Construction and Use of 15 metre length overall (LOA) to less than 24 metre registered length (L) Fishing Vessels TIMES: all times used in this report are UTC +1 unless otherwise stated
Image courtesy of Sean Boyce, MarineTraffic.com Aquarius
1 SYNOPSIS In the early hours of the morning on 17 August 2015, a fisherman on board the 20.8m twin rig trawler Aquarius was struck and thrown overboard violently by a steel wire trawl warp when a rope stopper parted. The vessel had just cleared the port of Aberdeen, Scotland, and its crew were attempting to re-mark the trawl warps when the accident happened. The skipper reacted quickly to stop the vessel, and the crew threw lifebuoys to the casualty. However, the recovery attempt was unsuccessful and the casualty sank out of view approximately 10 minutes later. Despite a search involving numerous vessels and a helicopter, the casualty’s body was not recovered. In order to mark the steel wire warp, the crew had streamed it over the stern. The stopper was used to take the strain of the trailing warp so that the crew could lower its inboard section on to the deck. The MAIB investigation established that: • The stopper parted under tension because a man-made fibre rope had been used instead of a chain, and because the way it had been applied deviated from well- established good practice. • The casualty was thrown overboard because he had positioned himself within the bight of the slackened trawl warp. • The crew were unable to recover the casualty back on board because neither they, nor their vessel had been adequately prepared to deal with such emergency situations. • The casualty’s body was not recovered because he was not wearing a lifejacket or other type of personal flotation device while working on the open deck. The Maritime and Coastguard Agency had surveyed and inspected Aquarius on numerous occasions during the previous 9 years. It had identified Aquarius as a poorly run vessel and issued it with 137 deficiencies; many of these related to safety management and were of a repetitive nature. The underlying factors that contributed to this accident included: a total lack of proactive safety management; a poor level of onboard safety culture; and the crew suffering from tiredness and fatigue. Recommendations have been made to the owners of Aquarius, the vessel’s manning agency and the Maritime and Coastguard Agency. These are aimed at improving the levels of safety management and emergency preparedness on board Aquarius; the working conditions and hours of rest for non-UK nationals on board UK flagged fishing vessels; and the capability of the electronic systems used by the Maritime and Coastguard Agency to manage and monitor deficiencies and poor performing fishing vessels.
2 SECTION 1 - FACTUAL INFORMATION 1.1 PARTICULARS OF AQUARIUS AND ACCIDENT SHIP PARTICULARS Vessel’s name Aquarius Flag UK Classification society Not applicable Fishing numbers BF 89 Type Stern trawler Registered owner MB Aquarius Ltd Manager(s) n/a Construction Steel Year of build 1994 Length overall 20.80m Gross tonnage 189t Main engine power 600kW Minimum safe manning Not applicable Authorised cargo Fish VOYAGE PARTICULARS Port of departure Aberdeen Intended port of arrival Aberdeen Type of voyage Fishing Manning 6 MARINE CASUALTY INFORMATION Date and time 17 August 2015 at about 0140 Type of marine casualty or incident Very Serious Marine Casualty Location of incident 2 miles east of Aberdeen harbour Place on board Aft main deck Injuries/fatalities One fatality Damage/environmental impact None Ship operation Single rig trawling for squid External & internal environment Westerly wind at 10kts; calm to slight sea; visibility good (night); sea temperature 13.8°C. Persons on board 6
3 1.2 NARRATIVE Shortly after midnight on Monday 17 August 2015, the UK registered fishing vessel Aquarius entered Aberdeen harbour, Scotland, and berthed on the fish quay. Once secure alongside, the vessel’s crew landed their catch of 47 boxes of squid. On completion, the skipper moved Aquarius to an adjacent quay to create space for another fishing vessel to come alongside. Before departure from Aberdeen, the skipper gathered his five-man crew together and informed them that he needed to re-mark the vessel’s steel wire trawl warps (Figure 1). He explained that this would be done once the boat was clear of the harbour, and that he wanted the warps to be marked at 125 fathoms1. At about 0100, the crew let the mooring ropes go and the skipper manoeuvred Aquarius away from the quayside. As the boat was manoeuvred out of the harbour the crew secured the trawl doors to the stern gantry and disconnected the port side trawl warp (Figures 2a and 2b). Once Aquarius was clear of the harbour entrance, the crew veered the port trawl warp winch drum, and lowered the warp over the stern and into the sea. The crew stopped the winch at the warp’s 100 fathom marker and waited for the skipper to come aft and measure the additional 25 fathoms. The skipper was busy navigating the vessel clear of harbour traffic, and directed Annang Nuertey, one of the vessel’s Ghanaian deck crew, to carry on and complete the job. Under Annang’s instruction, the warp was veered a further 25 fathoms and marked temporarily with adhesive tape. One of the crewmen then used a length of synthetic fibre rope to apply a stopper2 to the tensioned steel wire warp (Figures 3a and 3b). The winch was again veered and the inboard section of the warp became slack as the strain transferred to the rope stopper. With the weight of the streamed warp being taken by the rope stopper, the crew pulled the slackened section of warp inboard and laid it on the deck (Figure 4). Annang knelt on the deck outboard of the slackened warp and began to open its wire strands with a marlin spike; his intention was to insert a fibre rope marker (Figure 5). Another crew member knelt on the opposite side of the warp to assist in holding it securely. The three remaining crew members stood inboard of the warp towards the stern of the boat (Figure 6). At the same time, the skipper was gradually altering the vessel’s course to head south towards his intended fishing grounds, steaming at a speed over the ground of 5 to 6kts (Figure 7). At about 0140, the slackened warp suddenly snapped tight with a loud bang, striking Annang and catapulting him backwards over the boat’s port side and into the water. On hearing the loud bang the skipper put the engine to stop and ran out of the wheelhouse towards the main fishing deck aft. On his way, the skipper met a crew member running in the opposite direction to fetch a lifebuoy. The crew member was shouting “Annang overboard, Annang overboard”. The skipper passed a powerful torch to him with the instruction to shine it on Annang in the water. The skipper then returned to the wheelhouse and briefly put the boat’s engine astern. 1 A fathom is a unit of length equal to 6 feet (1.8m), chiefly used in reference to depth of water. 2 A stopper is a device that is used to temporarily take the weight off a rope that is under strain.
4 Image courtesy of Seafish Figure 1: Demersal trawl net arrangment
5 Figure 2a: Stern view of Aquarius Trawl doors Figure 2b: Port trawl warp Trawl warp
6 Figure 3a: Reconstruction of rope stopper applied Figure 3b: Reconstruction of rope stopper trapped in block after warp slackened off
7 Escape Up Down Escape Hatch (flush) Hatch (flush) × Figure 4: Plan view of deck with warp pulled inboard Figure 5: Reconstruction of marking the warp Trawl winches Stopper Trawl doors Net winches Trawl warp
8 Figure 6: Positions of the deck crew when the stopper failed Figure 7: Track of Aquarius on departing Aberdeen Reproduced from Admiralty Chart BA 1446 by permission of the Controller of HMSO and the UK Hydrographic Office. Position at time of accident Aquarius departure track Escape Up Down Escape Hatch (flush) Hatch (flush) × Trawl winches Stopper Trawl doors Net winches Key Annang (deceased) Filipino crewman Other crew
9 One of the crew threw a lifebuoy into the water, but it landed too far away from Annang for him to seize. At about 0143, the skipper manoeuvred Aquarius to place Annang directly astern, close to the vessel and within the area of sea illuminated by the vessel’s floodlights. Another lifebuoy was thrown, and this landed about 3 to 4m away from Annang, but he was unable to swim to it. The crew shouted encouragement to Annang as he treaded water; Annang made noises but did not respond coherently. Shortly afterwards, the deck crew saw Annang sink below the surface. He did not reappear. At 0155, the skipper called Aberdeen Vessel Traffic Services (VTS) on his mobile phone and reported that one of his crew had gone overboard. Aberdeen VTS then alerted the Aberdeen coastguard, which in turn transmitted a “Mayday” relay broadcast on very high frequency (VHF) radio channel 16. The Royal National Lifeboat Institution’s (RNLI) all-weather Severn Class lifeboat Bon Accord, and an inshore D Class lifeboat, were launched from Aberdeen at
- The search and rescue (SAR) helicopter Bond 1 was also scrambled. The
coastguard co-ordinated a systematic search of the area for Annang, with numerous fishing vessels and oil support ships in the vicinity tasked to assist. At about 0400, the two lifebuoys thrown from Aquarius were recovered, along with one yellow Wellington boot of the type worn by Annang. Further searching proved unsuccessful, and the SAR effort was called off later that morning. Annang’s body was not found. 1.3 ENVIRONMENTAL CONDITIONS The accident occurred during the hours of darkness; the visibility was good and a light Westerly breeze was blowing at 10kts. The sea state was calm to slight and the sea temperature was recorded at 13.8°C. The charted depth of water where the accident occurred was about 30m and the surface of the seabed was shown on the chart as sand and gravel. 1.4 CREW Aquarius was certified to carry a crew of five, but was being operated with a crew of six at the time of the accident. The skipper of Aquarius was a 46 year old UK national and was also part owner of the vessel. He was a career fisherman and had qualified as Deck Officer (Fishing Vessel) Class 2 in 1999. He also held an Engineer Officer (Fishing Vessel) Class 2 qualification. Four of his five crew members were Ghanaian nationals; the fifth was Filipino. The Ghanaian crew were all supplied by the crewing agency PG Manning Ltd and employed on a seaman’s contract of employment (Annex A). The duration of the contract between the vessel and the crew members was 15 months (+/- 3 months on mutual consent). They lived on board Aquarius for the duration of their contract.
10 The crew members were all career fishermen and had completed the mandatory training3 required to work on board a UK registered fishing vessel. In addition to their basic safety training, all crew had completed the Sea Fish Industry Authority (Seafish) safety awareness for experienced fishermen course, the syllabus of which included accident prevention and risk assessment. None of the crew, with the exception of the skipper, had any navigation, radio communications or watchkeeping qualifications. Annang Nuertey was 47 years old. He had previously been employed in various fisheries around the world and had worked on several Scottish boats prior to joining Aquarius in January 2015. His command of the English language was above the local Ghanaian average. The other three Ghanaian crewmen were aged between 37 and 46 years old. Two had been on board Aquarius for over 6 months, the third had joined the vessel 3 weeks before the accident. Although the least experienced on board Aquarius, the third Ghanaian crewman had completed two previous contracts on UK registered fishing vessels, and had known Annang in Ghana. The Filipino crewman was 45 years old and had been working on Aquarius for 5 years. His command of the English language was good. The skipper had not nominated a deck crew leader, but typically passed his instructions to Annang or the Filipino crewman as they had the most fishing experience and the best command of the English language. 1.5 AQUARIUS 1.5.1 General Aquarius was a steel hulled stern trawler built in Buckie, Scotland, in 1994 and was originally named Crystal River. It was registered in Banff, Scotland, with the fishing vessel registration number BF 89, and its length overall (LOA) was 20.8m. The vessel was owned by MB Aquarius Ltd, a company which had four shareholders, one of whom was the skipper at the time of the accident. United Fish Selling Ltd, based in Buckie, provided agency services to Aquarius and several other local fishing vessels. Its services included the procurement of spare parts, quota management, liaison with authorities and crewing management. Aquarius carried a digital selective calling (DSC)4 enabled ICOM GM651 VHF radio set and a Tron 30s MkII emergency position indicating radio beacon (EPIRB). 3 New entry fishermen must complete basic safety courses in sea survival; first-aid; fire-fighting and fire prevention; and health and safety. Fishermen with 2 years’ experience must also complete a 1 day safety awareness and risk assessment course approved by Seafish, as required by the Maritime and Coastguard Agency. 4 A DSC-enabled VHF radio allows the operator to transmit a substantial amount of critical information, including the vessel’s position, to the coastguard and nearby vessels in an emergency by the pressing of a button and without the need for voice communication.
11 1.5.2 Fishing gear Aquarius operated mainly as a twin rig demersal trawler and fished principally for white fish such as cod, monkfish and haddock. Aquarius had reached its annual quota for white fish the week before the accident, and the skipper had re-rigged the vessel to catch squid. The rig consisted of a single net, two sets of sweeps, bridles and warps, and a pair of trawl doors (Figure 1). The length of the bridles/sweeps was shortened from 80 fathoms to 40 fathoms to fish in shallower waters, and the cod-end bag changed to a smaller mesh size. The trawl warps were 22mm diameter, right-hand ordinary lay, galvanised steel wire ropes. Each steel wire warp was spooled on to its own separate winch, with one warp connected to each trawl door. The net was hauled and shot from its own independent drum winch. 1.6 CREW WORKING PATTERNS Whenever possible, Aquarius was operated 24 hours a day, 7 days a week. Other than landing its catch, the vessel spent time in port only if it was under repair, weather-bound or unable to fish due to lack of available quota. The skipper shared a 10 day on and 10 day off working routine with a contracted skipper who had been working on Aquarius for a number of years. While the crew were on contract, there was no provision for them to take leave. In the months leading up to the accident, Aquarius had been fishing for white fish around the coast of Scotland. A typical working period involved 1 day steaming to the fishing grounds, 5 or more days fishing, and 1 day steaming back to port to land the catch. The fishing routine was a continuous cycle of shooting the nets, towing the gear for about 5 hours, hauling in the nets and processing the catch. The crew got broken rest periods while steaming to and from the fishing grounds. While fishing, the crew typically got 2 to 3 hours rest every 6 hours after processing the fish and before hauling in the next catch. When the skipper was resting, the deckhands would take turns to man the wheelhouse for periods of 2 hours. When the skipper began to fish for squid, the crew’s work routine changed. As squid was fished only during daylight hours and spoils quickly once caught, the working day was split between steaming to fishing grounds, repeatedly shooting/hauling nets, processing the catch, and steaming back to port to land the day’s catch. During the 24-hour period prior to the accident, the crew got 11 hours rest. This rest was split into multiple periods, most being about 1½ hours in duration, and none more than 4 hours in length. 1.7 MARKING THE TRAWL WARPS When fishing, the mouth of the net is kept open by trawl doors. To ensure that the fishing gear is towed at its optimum efficiency it is necessary to know how far apart the trawl doors are. Electronic trawl monitoring systems are often fitted on vessels to determine and monitor door spread, but nonetheless many fishermen still prefer to use traditional measurement and calculation methods, particularly on board smaller fishing vessels.
12 Aquarius was fitted with an electronic Rapp Marine PTS Pentagon winch control system and a Simrad ITI acoustic trawl monitoring system. Both systems provided computer display readouts in the wheelhouse (Figure 8). The skipper had limited confidence in his vessel’s electronic systems and preferred to physically mark his warps to give a visual reference of how much wire had been payed out. The skipper used strands of man-made fibre rope to mark his warps. To do this, the crew used marlin spikes to open up the steel wire warps and wove the markers between the warps’ steel wire strands. Due to the effects of warp stretch and splice repairs, the skipper typically re-measured and, where necessary, re-marked his warps every 2 months. This periodic process was usually carried out in port, where the crew could haul the warps along the quay to measure and re-mark them. During the 2-week period prior to the accident, the warps were measured and re-marked in a similar manner to that on the day of the accident, on three separate occasions with the vessel at sea. On the last occasion, 2 days before the accident, an additional mark was inserted into the warp at 100 fathoms in preparation to fish for squid. During one of the evolutions, the Filipino crewman raised safety concerns over the way in which the task was being conducted. However, his warnings were ignored and he was aggressively rebuked by his Ghanaian crew mates. Figure 8: Wheelhouse electronic displays ITI SIMRAD unchanged from twin rig configuration PTS Pentagon showing single rig configuration
13 1.8 THE ROPE STOPPER The rope used by the crew to stopper the warp was a three stranded, 14mm diameter PolysteelTM man-made fibre rope. Its tensile strength5 was 3.8t. The length of rope used for the task was cut from a new coil a few days earlier, and had been used as a stopper on two previous occasions. The manner in which the stopper was applied on those occasions was similar to that on the day of the accident. Following the accident, remnants of the rope stopper were found on the gantry cleat. These were removed by the crew because they wanted to use the cleat to moor the vessel alongside. The remnants of the rope were subsequently disposed of overboard prior to the vessel’s arrival back into Aberdeen. During the MAIB inspectors’ initial inspection of the accident site, the deck crew were asked to demonstrate how the stopper had been applied. It was observed that the crewman initially secured one end of the stopper rope to a cleat on the port side of the stern gantry (Figure 9). He then looped the other end of the rope over the warp and around the cleat three times before tying it off around the warp with a series of half hitches. When the warp winch was veered, it was noted that the stopper hitch moved aft and entered the gantry block (Figure 10). The steel wire warp was then seen to slip a short distance through the hitch before the stopper tightened and took the strain. 1.9 THE CODE OF SAFE WORKING PRACTICE FOR THE CONSTRUCTION AND USE OF 15 TO 24 METRE FISHING VESSELS Aquarius was required to comply with the Code of Safe Working Practice for the Construction and Use of 15 metre length overall (LOA) to less than 24 metre registered length (L) Fishing Vessels (15-24m FV Code)6. The aim of the Code was to set standards of safety and protection for all staff on board fishing vessels. It set minimum standards for construction, machinery, equipment and also stability. To comply with the 15-24m FV Code, the vessel owners were responsible for ensuring that the vessel: • Was built, equipped, surveyed, certified and maintained and operated in accordance with the relevant provisions of the Code. • Was subjected to annual self-certification inspections. • Continued to comply with the requirements of the Code in service. • Was operated by appropriately qualified and certificated crew who had completed mandatory training courses. • Was not operated as a fishing vessel without a valid UK fishing vessel certificate being in force. The full text of the 15-24m FV Code was set out by the Maritime and Coastguard Agency (MCA) in its Merchant Shipping Notice (MSN) 1770 (F) 5 The tensile strength is the load at which a new rope, tested under laboratory conditions, can be expected to break. 6 The Fishing Vessels (Safety of 15-24 Metre Vessels) Regulations 2002 gave statutory force to the 15-24m FV Code.
14 Figure 9: Reconstruction of application of the stopper hitch from cleat on port side to the warp
15 Figure 10: Reconstruction of stopper trapped in the gantry block as warp is veered
16 1.10 SURVEYS AND INSPECTION REQUIREMENTS 1.10.1 Certification process for 15 to 24 metre fishing vessels The MCA issues UK fishing vessel certificates that routinely are valid for 5 years. Before a certificate is issued or renewed, fishing vessels are surveyed by appointed surveyors to verify compliance with the 15-24m FV Code and applicable legislation. In order to verify ongoing compliance with the Code, an intermediate inspection by an appointed surveyor must be carried out between the 2nd and 3rd anniversary of the certificate issue/renewal date. Certificates may be issued for periods of less than 5 years if the surveyor considers that the standard of the vessel requires an enhanced level of scrutiny. Fishing vessel owners are required to present their vessels for survey within the prescribed time frames or prior to undertaking any major repairs or modifications. Aquarius’s fishing vessel certificate had been renewed on 29 January 2013 and was valid until 18 December 2017. For the certificate to remain valid an intermediate inspection was required between 28 December 2014 and 28 December 2015. Although not overdue, this intermediate inspection had not been carried out prior to the accident. The MCA’s Marine Guidance Note (MGN) 430 (F) Checks on Crew Certification and Drills (Annex B) provided information to fishing vessel owners and skippers on the checks its surveyors will make regarding crew certification and the conduct of emergency drills during vessel surveys and inspections. The guidance explained that surveyors will: • ensure that the correct certificates of competency are held and safety training courses have been undertaken by skippers and crew; • check that written health and safety policies are in place and completed risk assessments have been carried out; • witness emergency drills as part of the renewal and intermediate surveys on the vessel or at any other time as deemed necessary by the MCA; • confirm that emergency drills (fire, collision/grounding, man overboard, abandon ship, anchoring) are practiced monthly and when a new crew member joins the vessel; • if practicable, and when there is no evidence that drills have been conducted and it is considered the crew are not trained for an emergency, ask vessels to proceed from the harbour to a safe anchorage to undertake anchoring drills. This increases the validity of the drill and provides a more challenging, realistic environment. 1.10.2 Annual self-certification In addition to the survey and inspection requirements detailed in paragraph 1.10.1, Aquarius’s owners or their delegated representative were required to check the vessel annually to ensure that: i. all firefighting appliances, lifesaving appliances and safety equipment that are carried on board the vessel have been suitably maintained and are within date;
17 ii. the radio equipment is functioning correctly; iii. the shipborne navigational equipment, nautical publications and lights, shapes and sound signal appliances, that are required for compliance with the Collision Regulations, are carried on board and are functioning correctly; iv. the risk assessment remains appropriate to the vessel’s fishing method and mode of operation; v. no known alteration, damage or deterioration to the vessel or its equipment has occurred in service that would affect the vessel’s compliance with the requirements of the Code or the vessel’s stability; vi. weathertight doors and hatches are functioning correctly; and vii. crew training and certification are valid. On completion of each annual check, owners were required to sign declarations confirming compliance with the mandated standards, and to retain them on board for subsequent inspections. Self-declaration forms (Annex C) were provided for use by fishing vessel owners in Annex 2 of MSN 1770 (F). The skipper of Aquarius could not produce any self-declaration forms and there was no evidence that the annual verification checks had been carried out. This fact had been identified during the MCA’s post-accident inspection of the vessel, and recorded as a safety-critical deficiency in the inspection report. MCA surveyors had also identified this omission during several previous surveys and inspections. 1.10.3 Offshore industry guard ship inspections Guard ships are employed to patrol and protect valuable offshore assets in the North Sea. In particular, they are used to keep fishing vessels and, where applicable, other marine traffic clear of vulnerable offshore assets. In order to generate additional income, fishing vessel owners could apply for a guard ship contract. Fishing vessels used for guard ship duties were required to hold a Load Line Exemption Certificate, and meet the safety specifications set out by SFF Services Ltd in its Guard Vessel Inspection and Specification Document (Annex D). In order to achieve this, participating fishing vessels were required to be inspected annually. Aquarius was presented annually for guard ship inspections between 2011 and
- The vessel was never contracted to conduct guard ship duties.
- 11
SURVEY AND INSPECTION PERFORMANCE RECORD In the 9 years prior to the accident, Aquarius was surveyed and/or inspected by MCA surveyors on nine separate occasions. These were conducted for the maintenance of Aquarius’s fishing vessel certificate and verification of compliance with the guard ship safety specification. The MCA surveyors recorded 137 deficiencies during these nine surveys and inspections.
18 Of the deficiencies recorded, 65% were classified as safety-critical and needed to be rectified before the vessel’s departure from the port of survey. During this period, the MCA’s visiting surveyors held frequent discussions with the skipper concerning the repeated nature of many of the deficiencies identified, the lack of risk assessments and safety drills. On 21 March 2013, the MCA conducted a targeted inspection that focused on crew certification and competency following concerns raised by the Scottish Fishery Protection Agency when it boarded the vessel at sea on 15 March 2013. 1.12 POST-ACCIDENT INSPECTION On 18 August 2015, a targeted post-accident general inspection of Aquarius and its safety equipment was carried out in Aberdeen by an MCA surveyor. During the surveyor’s initial sampling process he identified so many safety-critical deficiencies that he suspended the inspection and detained the vessel. At the skipper’s request, the surveyor returned to the vessel on 21 August to conduct a release from detention inspection. This was required in order that the vessel be allowed to proceed to the port of MacDuff for repairs. During that inspection, the surveyor recorded 23 deficiencies, two of which needed to be rectified before the vessel proceeded to sea, and 18 required action to be taken at the next port. On 26 August 2015, an MCA surveyor carried out an intermediate fishing vessel certificate inspection in MacDuff. Following that inspection, Aquarius was put to sea without rectifying the safety-critical deficiencies identified by the MCA surveyor. The vessel was subsequently detained on its return to the harbour at the end of August. 1.13 MANAGEMENT OF DEFICIENCIES On completion of each vessel survey or inspection the vessel details and the deficiencies identified were recorded by the MCA surveyor on a paper report form7; a copy of the report was passed to the vessel owner/skipper. The content of the inspection report form was later entered into the MCA’s electronic Ship Inspection And Survey (SIAS) database. When outstanding deficiencies were rectified, vessel owners were required to inform their local MCA marine office. The marine office staff would then update the information held within the SIAS database. For deficiencies identified on board Aquarius, the vessel’s agent (United Fish Selling), assumed the responsibility of reporting to the regulator that they had been rectified. The SIAS database could be interrogated to provide reports of outstanding deficiencies for individual vessels, but there was no facility within the database to alert surveyors when a deficiency had passed its required action date. The surveyors in the Aberdeen marine office typically monitored the status of deficiencies by reviewing the paper files of individual vessels. An attempt was made within the Aberdeen marine office to proactively identify fishing vessels with a poor safety record. The aim of this project was to concentrate the surveyor resources on a few targeted vessels to improve their safety management. The project had identified Aquarius as one of the top 10 vessels to be targeted in the region. 7 MCA MSF 1602 and 1603 forms - Report of Inspection and/or Survey of United Kingdom/ Dependent Territory/ Foreign Vessel.
19 1.14 LIFE-SAVING APPLIANCES The requirements for Aquarius’s life-saving appliances (LSA) were set out in Chapter 7 of the 15-24m FV Code. As a minimum, the vessel was required to carry: • At least two liferafts8. • A lifejacket for each person on board, plus an additional two lifejackets. • At least two lifebuoys, one of which should be provided with a self-igniting light and self-activating smoke signal, and the other provided with a buoyant line of at least 18m in length. • A means of recovering a person from the water. • A line-throwing appliance. • Six red rocket parachute flares, two buoyant orange smoke signals and four red hand flares. • One hand-held VHF radio. • One float-free9 satellite EPIRB. Liferafts should be readily available for safe and rapid use in an emergency. They should also be stowed in such a manner that enables them to float free from their stowage, inflate and break free from the vessel in the event of its sinking. During the MCA’s post-accident inspection on 18 August 2015, the port liferaft on board Aquarius was found to be rigged incorrectly and would not have deployed automatically as required. For a crew of six, Aquarius should have carried eight emergency use lifejackets, but the MCA surveyor found only five on board during his post-accident inspection, two of which did not have the required lights. There were three lifebuoys on board, one of which was fitted with a light and smoke signal, but they did not have the required standard of retroreflective tape and markings. The lifebuoy fitted with the self-igniting light and self-activating smoke signal was not easily accessible because a pilot ladder had been stowed and lashed down in front of it. This lifebuoy was not used during the manoverboard rescue attempt. Aquarius did not carry a dedicated means of recovering a person from the water. The MCA’s record of particulars for Aquarius, dated 29 January 2013, listed Patching and Line as the vessel’s manoverboard recovery equipment. The skipper and his crew were unable to explain what was meant by Patching and Line. Aquarius was equipped with the distress flares required by the 15-24m FV Code, however the inspection found that the service life had expired in July 2014 (13 months before the accident); the boat’s medical kit was also out of date. The vessel’s Global Maritime Distress and Safety System (GMDSS) logbook had not been maintained as required. The EPIRB’s hydrostatic release unit expired in September 2014, and its battery life expired 4 months before the accident. There were also no records to indicate that the EPIRB had been tested at monthly intervals. 8 The liferafts had to meet the requirements of SOLAS 1974 as amended. 9 Float-free in relation to LSA means that the appliance is automatically released from a sinking vessel and is ready for use.
20 1.15 VESSEL SAFETY MANAGEMENT 1.15.1 General duties In accordance with Regulation 5 of the Merchant Shipping and Fishing Vessels (Health and Safety at Work) Regulations 1997, an employer10 has a general duty to: ‘ensure the health and safety of workers11 and other persons so far as is reasonably practicable’. In order to fulfil their general duties, the owners of Aquarius were required to endeavour to: • Avoid or minimise risks • Evaluate unavoidable risks and take actions to minimise them, and • Adopt safe work patterns and procedures. In practice, the day-to-day management of the shipboard operations and safety was under the control of the skipper. 1.15.2 Safety management system Seafish provided safety management guidance for the UK fishing industry on its website, and reminded fishing vessel owners that: Vessels are required to be operated in a safe manner, it is the responsibility of the owners/skippers of fishing vessels to ensure that they are compliant with the The Merchant Shipping and Fishing Vessels (Health and Safety at Work) regulations 1997. In order to help fishing vessel owners and skippers manage their vessels safely, and to comply with their regulatory obligations, Seafish created a structured safety management folder (safety folder). The safety folder was aimed at helping skippers/ owners to produce a management system for their vessel and contained examples of risk assessments for different types of fishing operations, as well as a vessel safety policy template, and vessel safety checklists. The safety folder was available in hard copy and was supplied to fishermen attending the Seafish safety awareness course. Alternatively, it could be completed and maintained online12. The safety folder included checklists, templates and forms for: • Vessel safety policy statement • Emergency procedures and drills • Crew details and induction training • Muster plan 10 Employer means a person by whom a worker is employed under a contract of employment. 11 Worker means any person employed by an employer under a contract of employment, including trainees or apprentices. 12 www.safetyfolder.co.uk
21 • Risk assessments • Records of equipment inspections • Stability. A paper copy of the Seafish safety folder was carried on board Aquarius. The safety folder’s initial entries were made in late 2012 and early 2013. These entries were coincident with the fishing vessel certificate renewal survey conducted on 29 January 2013. The vessel owners’ safety policy statement included their intent to comply with all relevant health and safety legislation. It also included a commitment to review the vessel’s equipment registers, safety procedures and risk assessments every 12 months, or following a significant event. The folder and the vessel’s risk assessments had not been reviewed or updated since their initial compilation, and there was no other safety management system in use on board. 1.15.3 Emergency procedures and drills Section 8.1.2.1 of the 15-24m FV Code stated that: The skipper should ensure that the crew are trained in the use of all lifesaving and fire appliances and equipment with which the vessel is provided and should ensure that all members of the crew know where the equipment is stowed. Such training should be carried out in drills, held in port or at sea, at intervals of not more than one month. For a vessel with a crew of five or more, a muster list is required containing clear instructions for each crew member to follow in the event of an emergency. There was no muster list posted on board Aquarius. The emergency procedures listed in the Seafish safety folder included man overboard; location and recovery. The MCA provided generic guidance on the conduct of emergency drills on board fishing vessels for surveyors, skippers and crew in an annex to MGN 430 (F).13 The guidance for manoverboard included: Crew general: • Sound crew alarm • Crew to muster stations with warm clothing and lifejackets donned correctly • Was the crewman seen to have fallen overboard? Yes / No • If yes, throw lifebuoy with smoke / light float attached to mark position • If no, note time and position and consider using smoke / light float anyway to mark a datum position. This will give a visual marker to searching vessels and aircraft as an indication of the tide and surface water movement in the search area from a given time. 13 MGN 430 (F) – Checks on Crew Certification and Drills (see Annex D)
22 Skipper: • Press MOB function on navigational aid, if fitted and crew alarm • Inform ships mate with all details • Send DSC alert and commence voice transmission on VHF, MF or HF as appropriate • Inform Coastguard of any updated information and the description of missing person • Haul fishing gear if fishing • If not fishing and navigation allows commence Williamson turn • Pass any additional information to the Coastguard and any other vessels assisting • Keep all search units up to date by sending situation reports regularly. Mate: • Crew muster report to skipper, crewman missing? Yes / No • Collect details of missing crewman and pass to skipper as soon as possible, time and place last seen, clothing type and colours, age and state of health • Ensure crew are dressed appropriately • Post lookouts forward, wing of the bridge port and starboard also on a high point aft • Search vessel for missing crewman and prepare to launch rescue boat if carried • Organise man overboard recovery system • Organise dry clothing and first aid equipment, prepare to treat for hypothermia. Guidance regarding the use of the manoverboard recovery systems emphasized that crews should be well trained in their use, and appreciate the limitations of their use in poor weather conditions as well as fine weather. Aquarius’s manoverboard recovery procedure (Annex E), as stated in its safety folder, was: Our procedure for a man overboard is to keep a visual on the man while the others prepare a ring and line. The best location for retrieving a man is on the stern where it’s the lowest point and we have 2 winches to haul a person on board very easily. [sic]
23 The vessel’s safety folder also contained a log sheet to record the conduct of emergency drills at monthly intervals. These log sheets had not been used and there were no records of any emergency drills having been conducted within the vessel’s logbook. The last recorded safety drill was carried out on board Aquarius during an MCA inspection in January 2013 (Annex F). The Ghanaian crew members’ details had not been entered into the relevant pages in the safety folder, and there was no record of them having received their induction training. They had not carried out any manoverboard drills, or undertaken any structured emergency training since joining the vessel. 1.15.4 Risk assessments The Merchant Shipping and Fishing Vessels (Health and Safety at Work) Regulations 1997 required that fishing vessel owners risk assess their vessels’ working operations, and review the assessments at regular intervals. MSN 1770 (F) incorporated this requirement and stated that: ‘A health and safety risk assessment should be used to satisfy the obligation of providing information to crew members of the measures taken for their own protection.’ The risk assessments contained within the safety folder on board Aquarius included one for general working on deck (Annex G). The hazards identified for work activities on deck included handling fishing gear, falling overboard and sudden capsize or loss of vessel. The consequences of falling overboard and sudden capsize or loss of vessel were drowning and death, and the control measures prescribed in the risk assessment were: • When working with the risk of M/O wear safety harness [sic] • Lifejackets worn when working on deck [sic] The crew were not familiar with the vessel’s documented risk assessments, and there was no risk assessment or safety procedure for the task of marking the warps. 1.15.5 Work equipment inspections The Merchant Shipping & Fishing Vessel (Provision and Use of Work Equipment) Regulations 2006 (PUWER), and the Merchant Shipping & Fishing Vessel (Lifting Operations and Lifting Equipment) Regulations 2006 (LOLER) apply to all UK registered fishing vessels. All tools, machinery, and equipment used at work are covered by the requirements of PUWER. This includes everything from a trawl winch to a gutting knife. PUWER requires that work equipment is suitable for the work to be carried out, or is properly adapted for that purpose, and may be used by workers without impairment to their health or safety.
24 Work equipment that is also lifting equipment will additionally be subject to the requirements of LOLER. Both regulations require that equipment be identified, maintained and inspected. Equipment used for lifting under LOLER regulations is subject to mandatory inspection routines and examination. The LOLER block accounting system contained in the Seafish safety management folder on Aquarius had not been updated for some considerable time (Annex H) and, along with the lack of crane wire certification, had been noted as deficiencies in previous MCA surveys. 1.15.6 Personal protective equipment and working lifejackets The Merchant Shipping and Fishing Vessels Personal Protective Equipment Regulations 1999 require employers to provide personal protective equipment (PPE) for their workers when they are engaged in, or at risk from, a hazardous work activity on board a UK registered vessel. Regulation 10 requires that: “The employer shall take all reasonably practicable steps to ensure that any personal protective equipment provided to workers under regulation 6(1) is used as instructed.” In circumstances where there is a foreseeable risk of crew falling overboard, the recognised PPE includes a safety harness and lanyard, a personal flotation device14 (PFD), and possibly also the use of a thermally-insulated immersion suit as appropriate. Aquarius’s owners had recently provided eight Parmaris 150N PFDs for use by the crew while working on deck. This was the direct result of lessons learned following a recent fatal man overboard incident on board another local fishing vessel, Beryl (see paragraph 1.18.2). These PFDs incorporated automatic and manual inflation, and complied with international safety standards15. Each member of the deck crew was given one of the PFDs and had received instruction on its use. The crew regularly wore their PFDs on deck during fishing operations, but on occasions the skipper had observed them working on deck without them. The skipper did not routinely enforce the requirement for the crew to wear PFDs when they were working on deck. 14 PFDs are divided into the following two main classes: those that provide face up in-water support to the user regardless of physical conditions (lifejackets); and those that require the user to make swimming and other postural movements to position their face out of the water (buoyancy aids). The selection of the appropriate PFD is dependent on the task undertaken and the environment in which it is conducted. PFDs that do not require intervention, such as auto-inflation lifejackets, are suited to activities where persons are likely to enter the water unexpectedly. 15 ISO 12402-3:2006 – Personal flotation devices – Part 3: Lifejackets, performance level 150 – Safety requirements.
25 1.15.7 Stability Aquarius’s stability booklet was originally approved by the MCA on 26 January 1999. On 29 January 2013 Aquarius underwent a lightship16 stability check. During this process it was found that an additional 2.5t of fishing gear was carried on board. This caused the vessel to fail certain stability safety criteria. Section 3.1.3.3 of the 15-24m FV Code stated: The carriage of unnecessary spare gear, stores and parts, the accumulation of debris and the cumulative effects of minor modifications over time can adversely affect the vessel’s lightship weight and centre of gravity. Attention should be made to limiting these effects if lightship growth and the possibility of adverse effects on the vessel’s stability are to be avoided. To make the vessel safe, the skipper was required to remove the additional 2.5t of fishing gear immediately. This was confirmed in a declaration signed and dated on 22 December 2014, by the vessel’s agent, as having being completed. During the MCA’s post-accident survey an additional 2.5t of fishing gear was again found on board. 1.16 SAFE WORKING PRACTICES 1.16.1 General safety guidance Chapter 6 of the 15-24m FV Code contained generic safety guidelines for the protection of the crew, but did not contain detailed guidance on safe working practices and general seamanship. In order to help inform fishing vessel owners and skippers of best practice, methods of mitigating hazards and reducing risks, the International Maritime Organization (IMO), the MCA and fishing industry bodies provided a variety of guidance and information. 1.16.2 Guidance provided by the International Maritime Organization The IMO provided international guidance on safety and health practice for fishermen, and safety and health requirements for the construction and equipment of fishing vessels in its Code of Safety for Fishermen and Fishing Vessels 2005. Although the IMO’s Code of Safety did not specifically discuss the task being attempted on board Aquarius when the stopper failed and Annang was thrown overboard, it did give the following warnings: • During the handling of mooring lines or other wires or ropes, care should be taken not to stand in the bights • Crew should pay special attention to ropes connected to the net such as bridles, false headlines, etc., when shooting. They should never stand in the bights of such ropes 16 Lightship is the weight of the vessel with no fuel, cargo, water, fishing gear or stores
26 1.16.3 The Fishermen’s Safety Guide The MCA’s Fishermen’s Safety Guide, originally written in 2008 and updated in May 2015, was endorsed by the UK Fishing Industry Safety Group (FISG). The guide provided a broad range of advice in respect of fishing safety, and its aim was to provide guidance and promote safety awareness to all. Section 3 of the guide contained the following warning: Do not stand on a slack warp laid on the deck; if the ‘stopper’ chain slips, it may suddenly become tight, throwing you up and perhaps overboard. The Fishermen’s Safety Guide is freely available to download from the internet: Aquarius did not have a copy on board. 1.16.4 Marine Guidance Notes The MCA’s MGN 415 (F), Fishing Vessels: The Hazards Associated with Trawling, Including Beam Trawling and Scallop Dredging was published in 2010. The guidance provided did not directly relate to the task being conducted at the time of the accident although it did provide warnings, similar to those given by the IMO, about the danger of standing in the bights of ropes. 1.16.5 The Code of Safe Working Practices for Merchant Seamen The MCA produced the Code of Safe Working Practices for Merchant Seamen (CoSWP)17 primarily for the use of merchant seamen on United Kingdom registered vessels. Although not required to be carried on board fishing vessels, CoSWP is an internationally recognised standard of good seamanship practices and is freely available to download from the internet. Chapters 21.17 and 26.3.18 of CoSWP provided guidance on the use of stoppers. Although much of the guidance referred specifically to mooring ropes, the same principles apply to stoppering any rope or wire under tension. The guidance stated that: • Natural fibre rope should be stoppered with natural fibre. • Man-made fibre rope should be stoppered with man-made fibre stopper (but not polyamide). • The ‘West Country’ method (double and reverse stoppering) is preferable for ropes. • Wire moorings should be stoppered with chain, using two half-hitches in the form of a cow hitch, suitably spaced with the tail backed up against the lay of wire, to ensure that the chain neither jams nor opens up the lay of the wire. This information was repeated in MGN 308 (M+F) Mooring, Towing or Hauling Equipment on all vessels – safe installation and safe operation. 17 The MCA issued a revised version of CoSWP on 4 September 2015 and renamed it The Code of Safe Working Practices for Merchant Seafarers. This revised version of CoSWP contained similar guidance.
27 An endless chain (Figure 11) for stoppering the trawl warps was carried on board Aquarius and had been used by the skipper and his crew on numerous occasions previously. 1.17 HOURS OF WORK AND REST REQUIREMENTS The Working Time: Sea Fishermen Regulations 2004 set out the working time limits and the amount of rest and annual leave to which workers on board UK registered fishing vessels were entitled. The MCA provided guidance on the application of the working time regulations in MSN 1786 (F)18. The regulations specified that: • A worker’s working time shall not exceed 48 hours per 7-day period averaged out over a year. • A worker is entitled to adequate rest, and the total hours of rest should not be less than 10 hours in any 24-hour period and 77 hours in any 7-day period. • A worker is entitled to paid annual leave of at least 4 weeks. • A skipper can require a worker to work any hours in an emergency. For objective or technical reasons, or for reasons having to do with the organisation of the work, the working time standards on board certain types of fishing vessels might be unachievable. In such cases, while the standards remain as the benchmark, exceptions to the limits may be allowed provided that the general 18 MSN 1786 (F): Application of the Fishing Vessels (Working Time: Sea-fishermen) Regulations 2004 Figure 11: Endless chain available for use on Aquarius
28 principles of the health and safety of the workers are respected. Such exceptions should take account of more frequent or longer leave periods or the granting of compensatory leave. The Fishing Industry Code of Practice on Working Time Standards (Working Time Standards Code), which was contained as an annex to MSN 1786 (F), was a Government-approved exception that applied to certain types of fishing vessels. This exception applied to Aquarius as a white fish trawler provided that compensatory rest was given to the crew to offset those occasions when the standards set out in Clause 7 of the Working Time Standards Code were not met. In order to comply with the working time regulations, employers were required to keep records that adequately demonstrated that employed sea-fishermen were receiving the minimum rest to which they were entitled. The regulations also required these records be retained for a period of 2 years and be made available for inspection. No records of rest were kept on board Aquarius. The contract of employment (Annex A) drafted by PG Manning Ltd for the Ghanaian crew of Aquarius, was between the vessel and the crew member. It made no mention of the applicable working time regulations, maximum working hours, minimum rest periods, compensatory arrangements or the requirement for paid annual leave. 1.18 PREVIOUS INCIDENTS ON AQUARIUS AND SIMILAR ACCIDENTS 1.18.1 Aquarius The MAIB accident information database contains records of seven incidents involving Aquarius. These include: • July 2013, and again in February 2015, Aquarius was towed back to port following an engine failure. • January 2010, Aquarius suffered a control system failure while crossing Lerwick harbour, and was towed alongside by the local lifeboat. • October 2009, the vessel’s wheelhouse was flooded when the windows were smashed by heavy seas. • January 2008, the vessel suffered partial flooding in the engine room as a result of a leaking stern gland. This was due to poor maintenance after the gland had been repacked but not tightened. The vessel was towed into port at Scrabster. • December 2005, Aquarius was towed into port by the lifeboat after a fuel tank valve failed, causing the vessel to run out of fuel. • August 2005 Aquarius collided with another fishing vessel, Fertile II, while pair trawling; Fertile II sank. The Chief Inspector of Marine Accidents wrote to Aquarius’s skipper recommending that he improve the standard of lookout, communications and maintenance procedures on board his vessel.
29 In addition to the reported accidents recorded on the MAIB database, the following incidents occurred: • October 2014, the skipper was fined for ‘intentionally obstructing a sea fishery officer’. • August 2014, the vessel’s stand-by skipper was fined for illegally landing fish and falsifying records. • March 2013, the owners of Aquarius were issued with an improvement notice for their failure to have a qualified GMDSS operator on board. • January 2013, the skipper was issued an official warning for operating Aquarius without a valid UK fishing vessel certificate. 1.18.2 UK fishing vessel fatal man overboard accidents From the period 1992 up to and including this accident, there have been 117 fatal man overboard accidents on UK registered fishing vessels. On 9 July 2015 the skipper of the twin rig stern trawler Enterprise fell overboard through one of the fishing net shooting ports when the vessel lurched in heavy seas. Although all of the other crew were wearing PFDs, he was not. It was estimated that he was in the water for 30 to 40 minutes before being recovered on board. Despite resuscitation efforts by the crew he did not survive. On 10 February 2015 a crewman on board the 28m twin rig trawler Beryl was carried overboard by the vessel’s port trawl net. The crewman was carried through the port shooting door and into the sea. He was conscious and managed to hold onto the net. The crewman was wearing a PFD and it inflated when he entered the water. Beryl’s crew spent almost 50 minutes trying to recover him back on board, but they were unsuccessful. The crewman was eventually recovered by a rescue craft launched from an offshore support vessel. He was transferred to a rescue helicopter and flown to hospital, but he did not survive. On 29 January 2012 a crewman was swept overboard from the twin rig trawler Zenith while standing on top of the aft bulwark rail during hauling operations. The vessel was quickly manoeuvred to bring the casualty alongside, but the crew were unable to recover him back on board and he slipped from their reach and was lost. He was not wearing a PFD. On 11 November 2009 a Filipino crewman was dragged into the sea from the deck of the fishing vessel Osprey by a net running over the side. Despite his crew mates’ attempts to recover him using a line and a lifebuoy, the crewman disappeared from the surface after about 12 minutes and was never recovered. He was not wearing a PFD. On 13 August 2008 a crewman was swept overboard from the twin rig trawler New Dawn by a towing chain while shooting gear. The skipper jumped into the sea to help the crewman but quickly began to succumb to the effects of the cold water. After some difficulty the skipper was recovered. Unfortunately, the crewman, who was not wearing a PFD, was not recovered.
30 On 3 September 2007 a crewman on board the stern trawler Apollo died after being dragged overboard by a trawl net during hauling. The vessel was quickly manoeuvred alongside the casualty, who grabbed hold of a life-ring thrown to him by his crew mates, and was pulled alongside. Once alongside he began to lose consciousness and, despite his crew mates’ efforts, was unable to be revived when he was recovered to the deck. The casualty, who had not been wearing a PFD, was in the water for approximately 15 minutes before his final recovery to the deck. The Chief Inspector of Marine Accidents wrote to the Chief Executive of the MCA suggesting that he consider extending an initiative for MCA’s surveyors to assist fishermen in their assessment of the risks encountered during fishing operations. 1.18.3 Annual self-certification On 30 March 2014 the owner/skipper of the 10m scallop dredger Ronan Orla was fatally injured when he became entangled on the warping drum of the vessel’s winch. One of the findings from the MAIB investigation was that self-certification, required to confirm the status of safety equipment, had not been carried out. A recommendation was made to the MCA regarding this within the report 12/2015: 2015/129 Amend Marine Guidance Note 502(F) The Code of Practice for the Safety of Small Fishing Vessels to require owners of under 24m fishing vessels to submit copies of their annual self-certification declarations to the regulator. The MCA rejected this recommendation.
31 SECTION 2 - ANALYSIS 2.1 AIM The purpose of the analysis is to determine the contributory causes and circumstances of the accident as a basis for making recommendations to prevent similar accidents occurring in the future. 2.2 OVERVIEW Ghanaian crewman, Annang Nuertey, was thrown overboard from the UK registered stern trawler Aquarius because he was kneeling within a bight of a trawl wire that suddenly came under tension when the stopper taking the weight of the wire failed. The crew were unable to recover him because the vessel was not effectively equipped to recover a person from the water, its emergency procedures lacked detail, and the crew had not practised manoverboard recovery. 2.3 THE FAILURE OF THE ROPE STOPPER The crew of Aquarius were attempting to mark the vessel’s port trawl warp while underway at sea when the accident happened. In order to do this, the warp was streamed over the vessel’s stern and towed along the seabed. The application of the stopper allowed the crew to slacken the inboard section of the warp and lay it onto the deck. The length of rope used for the stopper was cut from a coil of 3 stranded, 14mm diameter PolysteelTM rope, and had been used to conduct a similar evolution on at least two previous occasions. Remnants of the failed rope were found on board after the accident, but were thrown overboard prior to the vessel arriving back in port. As the remnants of the stopper had been discarded prior to the vessel returning to port, the condition of the rope used to create the stopper and its failure mode could not be verified. However, taking into consideration the sudden nature of the stopper failure, the method used to apply it, and that the remnants were found attached to the gantry cleat after the failure, it was apparent that the rope must have parted. Given this, the investigation considered three main scenarios that could have caused the stopper rope to part. These were: • Tensile overload due to the strain acting on the stopper exceeding the minimum breaking load of the PolysteelTM rope. • Tensile failure due to loss of residual strength as a result of previous rope damage. • Cutting of the man-made fibre rope by the steel wire warp following the failure of the stopper hitch. Aquarius was making 5 to 6kts over the ground and the skipper was executing a slow turn to starboard when the stopper failed. About 210m of the 22mm diameter steel wire warp had been streamed over the stern, over 100m of which would have been dragging along the seabed. Calculations indicate that, had the stopper rope been in good condition, it should have had sufficient tensile strength to hold the weight of the streamed warp. However, despite the surface of the seabed being sand and gravel, the risk of the trailing warp becoming snagged would have been ever present. Regardless of the condition of the rope used to create the stopper, had the warp snagged on the seabed the sudden increase in tensile load would have been more than sufficient to cause the stopper to part.
32 When the crew demonstrated how they had applied the stopper (Figure 9) it was evident that the method used was not in accordance with the guidance for good practice set out in seamanship manuals and CoSWP. It was also noted that the stopper hitch entered the gantry block and the warp slipped a short distance through it before the hitch tightened and the stopper took the strain. PolysteelTM rope is often used on board fishing vessels as it has good abrasion resistance and UV protection characteristics. It is about 40% stronger than equivalent diameter polypropylene and polyethylene ropes. Despite the rope only having been used to stopper the vessel’s warps on a couple of previous occasions, it is highly likely that it would have suffered significant abrasion damage each time the steel wire warp slipped over it. This abrasion damage would have decreased the tensile strength of the rope, and therefore increased the risk of it parting under tension. The manner in which the stopper was applied would also have presented a high risk of the stopper hitch failing. If the steel wire warp had suddenly started to slip through the stopper hitch, it would very quickly have cut through the man-made fibre rope. However, it is most likely that the stopper failed because the rope used to create it parted under tensile overload. It is also likely that the rope’s residual strength had been significantly reduced due to previous abrasion damage. Whatever the failure mode, it is without doubt that the method used to stopper the warp contributed significantly to this accident. 2.4 WORKING PRACTICES ON BOARD AQUARIUS 2.4.1 Marking the trawl The marking of Aquarius’s trawl warps, by opening up the steel wire strands and inserting lengths of man-made fibre rope, was an activity that the skipper and his crew carried out on a regular basis. The task was typically undertaken on the quayside when the vessel was in port. The reason for marking the warps was to allow the skipper to place the net on or near the sea bed, and also by varying the amount of wire veered to maintain the mouth of his net at its optimum width to catch fish. The electronic winch control and acoustic trawl monitoring systems fitted to Aquarius should have removed the need to mark the warps manually. However, the skipper had little confidence in the technology and it was apparent that the trawl monitoring system had not been set up for single net trawling (Figure 8). Having decided to rely on warp marks, it would have been much safer to have undertaken the task on the quayside in Aberdeen before sailing, where facilities were available by prior arrangement. If it was considered essential to conduct the task at sea, steps could easily have been taken to make the evolution much safer. For example, the warp could have been streamed once the vessel was clear of the harbour and marked while the vessel was drifting. The crew had recent experience of marking the warps in a similar manner at sea with the vessel making way. The successful completion of the task on several previous occasions is likely to have influenced some of the crew’s perception of risk, and led to them taking a complacent approach to their own safety. Nevertheless, the dangers associated with the task were obvious but had not been risk assessed, and there were no safe systems of work in place to follow. The activity undertaken was unnecessarily hazardous, and with proper planning the accident could easily have been avoided.
33 2.4.2 Standards of general seamanship The standard of seamanship executed in the build-up to this accident fell well short of recognised good practice. The guidance and warnings contained in publications such as the Fishermen’s Safety Guide, IMO’s Code of Safety for Fishermen and Fishing Vessels and the MCA’s MGNs and CoSWP appeared to have been ignored. Of note: • A man-made fibre rope was used to stopper the steel wire rope. • The way the stopper was applied increased the risk of slippage and failure. • The casualty positioned himself in the bight of a rope. It is a well-established seamanship practice to use chains or specially designed equipment when stoppering steel wire ropes. This should have been well understood by Aquarius’s crew, and man-made fibre rope should not have been considered suitable for use when stoppering the vessel’s steel wire warps. The hitch used to create the stopper, and the manner in which the stopper was applied, were not in accordance with the guidance provided in CoSWP or seamanship manuals (Figure 12). The stopper should have been applied in such a way that it could take the strain before it entered the gantry block. The effect of crushing the stopper rope against the steel groove of the gantry block wheel would have caused further damage to the man-made fibre rope. Standing in the bight of a rope is a hazard that all seafarers are taught to avoid during basic training. Furthermore, the subsequent dangers are constantly emphasised in seamanship manuals, safety posters and safety booklets. It is therefore difficult to understand why a seafarer as experienced as Annang would position himself in the bight of Aquarius’s slackened warp. This is especially so given the knowledge that an ad hoc stopper arrangement was being used to take the strain. It is equally difficult to understand why his fellow crew mates did not intervene and tell him to reposition himself. The space available on the deck, in which to conduct the work, was probably the dominant factor that led Annang to position himself in the danger zone. Figure 12: Chain stopper applied Secured end Free end
34 2.4.3 Leadership and teamwork The skipper did not formally appoint one of his crew to act as his first mate or to be the vessel’s senior deckhand. He often oversaw deck activities himself and typically relayed his orders through Annang or the Filipino crewman. Being the oldest and most experienced fisherman, the Ghanaian crew members looked to Annang for leadership, but also accepted direction from their Filipino crew mate. It was apparent that there had been a predominantly good working relationship among the deck crew, using English as the common language. However, this had recently been undermined when, a few days prior to the accident, the Ghanaian crew members reacted aggressively towards the Filipino crewman following his protests about their use of a fibre rope stopper, in a similar unsafe manner. Culturally, this would have brought shame upon the Filipino19. The lack of an appointed leader, the alienation of the Filipino crewman, and Annang’s status among his Ghanaian crew mates almost certainly had an influence on the way the tasks were conducted on deck. Similarly, these factors probably resulted in an unwillingness among Annang’s crew mates to challenge unsafe acts. This might explain why none of the other crew members intervened when Annang stood in the bight of the warp, and a fibre rope was used to stopper it. 2.5 MAN OVERBOARD In preparation for the task, Annang had positioned himself in the bight of the slackened warp. He was kneeling on the deck and leaning over the warp, with a marlin spike in one hand and the wire rope in the other, when the stopper parted. A second crewman was positioned on the other side of the warp and was helping to hold it steady (Figure 6). When the stopper parted, the slackened warp snapped tight with considerable force. Given Annang’s position within the bight of the warp, it is likely that it struck him across his chest and under his armpits as it snapped tight. The energy with which the crewman was lifted off the deck and catapulted overboard would almost certainly have severely stunned and disorientated him, and was probably sufficient to cause internal injuries. Nevertheless, Annang was alive when he entered the water and was able to keep himself afloat for several minutes without the aid of a PFD. 2.6 EMERGENCY RESPONSE When the crew raised the alarm the skipper’s initial reaction was to focus on monitoring Annang’s position in the water, and manoeuvring Aquarius astern towards him. The crew threw lifebuoys towards their crew mate in the water and shouted encouragement, but despite these efforts Annang soon succumbed and sank below the surface of the water. About 15 minutes after the casualty entered the water, and having realised that the attempts to rescue him had failed, the skipper used his mobile phone to alert Aberdeen VTS. 19 https://geert-hofstede.com/philippines.html
35 The initial steps taken by the skipper and his crew were broadly in line with those listed in the vessel’s manoverboard recovery procedure; however, they fell well short of recognised good practice. Many of the key initial responses listed by the MCA in MGN 430 (F) were not carried out. In particular: • A “Mayday” call was not transmitted. • The crew did not use the lifebuoy that had been rigged with smoke and light signals to mark the position of the casualty. • The skipper did not activate the manoverboard function on the vessel’s navigation aids. Alternative options for recovery of a person in the water were discussed within section 2.6 of the recent MAIB report 26/2015, into the fatal manoverboard from Beryl (BF 440). This included the consideration of deployment of a liferaft to provide either a temporary place of safety, or as a platform to aid recovery. When the crew initially raised the alarm the skipper was under the misconception that he and his crew would be able to recover Annang quickly, and without the need for external support. This assessment was wrong, and the emergency response was ineffective. 2.7 EMERGENCY PREPAREDNESS In order to minimize the consequences of marine accidents and incidents, fishermen and their vessels need to be prepared to deal with a variety of emergency situations. Fishermen are prepared through the delivery of training and the provision of guidance and procedures. Fishing vessels are prepared through design, the provision of LSA and other safety equipment. To ensure that training has been effective, emergency procedures are fully understood and safety equipment is suitable for its intended use, fishing vessel crews should conduct regular and realistic emergency response drills. Aquarius did not carry all the LSA required for a fishing vessel of its size, and the majority of the safety equipment it did carry was not being properly maintained. Of particular note: the vessel did not carry a dedicated means of recovering a person from the water, or a sufficient number of lifejackets for all on board; one of the liferafts had not been properly rigged; access to one of the lifebuoys had been obstructed; and the distress flares and first-aid supplies were out of date. The lifebuoy that was obstructed was the one that had been rigged with smoke and light signals, and it was not used during the rescue attempt. The vessel’s documentation listed patching and line as the equipment to be used to recover a person from the water, but the vessel’s manoverboard recovery procedure prescribed the use of a ring and line. No one on board knew what the term patching and line meant, and the limitations of relying on lifebuoys with lifelines to recover a person from the water became apparent as the emergency situation developed. The crew on board Aquarius were all experienced fishermen; they had completed the UK’s mandated sea survival and safety awareness courses, and should have had at least a basic understanding of what to do when Annang was thrown overboard. However, the vessel’s manoverboard procedure contained little or no detail on the fundamental steps to take in such an emergency situation, and indicated that it would be easy to recover a person from the water over the
36 vessel’s stern. As the crew did not conduct regular emergency drills, the vessel’s manoverboard procedure was not properly challenged, and the crew were denied the opportunity to practise and hone their skills. The MAIB has investigated numerous similar fishing vessel accidents (paragraph 1.18.2) and has repeatedly highlighted the dangers of falling overboard while working on deck, and the difficulty of recovering a person from the water. The MCA, fishing industry federations, and UK maritime safety organisations have also made great efforts to highlight these issues. However, it was clear that the skipper and owners had seriously underestimated the dangers associated with such an event. The response to the crewman falling overboard should have been instinctive to all on board; in particular, the alarm should have been raised immediately by activating the DSC function on the vessel’s VHF radio. It was clear that Aquarius and its crew had not been properly prepared to deal with the situation. Had the vessel been adequately equipped, its safety equipment properly maintained, and its crew regularly drilled, Annang’s chances of survival would have been increased considerably. 2.8 THE USE OF PERSONAL FLOTATION DEVICES ON DECK The risk assessments contained in Aquarius’s safety folder identified falling overboard as a hazard to persons working on deck, and recognised that the consequences of such an event could be fatal. In order to reduce the likelihood of a man overboard drowning, the control measures listed in the risk assessment for working on deck included the wearing of PFDs. In order to implement this control measure, the owners of Aquarius had provided each crewman with a 150N automatic inflation PFD. However, the crew did not wear their PFDs when they attempted to mark the trawl warps; the skipper did not have a PFD. When a person enters cold sea water after falling or being thrown overboard they often die swiftly due to the effects of cold water shock, or over a period of time due to the intake of water in turbulent seas. It is difficult to estimate with any accuracy the likely survival times for people immersed in water as there are many uncertainties. The temperature of the sea water, and the physiological attributes and health of the person immersed are key factors that can influence survival times. An uninjured person may be able to survive for several hours immersed in sea temperatures of 13.8°C.20 However, without the buoyant support of a PFD, a person’s survival time is often measured in minutes and seconds, rather than hours. The extent of injuries suffered, and the effect of cold water immersion when Annang was thrown overboard, are unknown. However, he was alive and treading water for several minutes before he sank out of sight. As the weather at the time of the accident was benign, it is almost certain that Annang would have been recovered had he been wearing his PFD. This was particularly so given the proximity of other vessels and shore-based rescue craft. The wearing of a PFD not only increases the chances of survival for a person who unexpectedly enters the water, but it also increases the likelihood of them being recovered back on board21. The procurement of the PFDs and their distribution to 20 Golden. F. Tipton M (2002). Essentials of Sea Survival pp129-139. 21 In the case of a person lost at sea, it can take up to 7 years under current UK legislation for them to be declared dead. This can cause years of financial and administrative problems for the family.
37 the crew on board Aquarius is to be applauded; however the failure to ensure that they wore them at all times when working was a significant factor in their inability to recover Annang once he fell into the water. 2.9 EFFECTS OF TIREDNESS AND FATIGUE When working, Aquarius was operated 24 hours a day, 7 days a week, by two skippers who shared a 10-day on / 10-day off work routine. The deck crew were all foreign nationals and were employed on 15-month contracts through manning agencies. The crew lived on board for the duration of their contracts and worked continuously without leave breaks. During the 24-hour period prior to the accident, the crew worked a total of 13 hours, but their rest periods were broken, with none lasting longer than 4 hours. It was apparent that Aquarius and its crew were being worked extremely hard for prolonged periods of time; therefore the risk of crew fatigue was high. This risk might have been heightened by the recent change to the vessel’s operating routine, as the switch to day running to fish for squid would have had an impact on their sleeping patterns. Sleep deprivation has a cumulative and negative effect on an individual’s health, and after several sleepless nights the mental effects become more serious. Under such circumstances, an individual’s ability to concentrate and make sound decisions will be impaired and, as a result, the risk of injury and accidents increases. Even if the crew were not feeling the chronic effects associated with long working hours and continuous periods of broken rest, tiredness and a desire to complete the job quickly so that they could sleep ahead of another busy day, almost certainly influenced their approach to the task of marking the warps. 2.10 HOURS OF WORK AND REST MSN 1786 (F) provided clear guidance on the application of the UK’s working time regulations for sea-fishermen employed on UK registered fishing vessels. The purpose of the regulations was to ensure that fishermen receive adequate rest and not less than a set minimum period of annual leave. In order to assess compliance, employers were required to keep records of each individual crew member’s hours of rest. The aim of this requirement was to ensure employers had the information necessary to monitor their crews’ work and rest patterns, and take steps to minimise the risk to their health and safety arising from fatigue. The difficulties in applying strict working time standards across a complex and diverse fishing industry were acknowledged in MSN 1786 (F), and allowance was made in the regulations for the application of exceptions to the mandated limits. The fishermen’s Working Time Standards Code provided a set of government-approved generic exceptions for certain classes of fishing vessel; Aquarius was subject to these exceptions. Nevertheless, the core requirements set out in the Working Time Standards Code were similar to those in the regulations. In circumstances where crew are expected to exceed the mandated working time limits, employers were required to ensure they were given more frequent and longer leave periods, or received compensatory rest.
38 The crew members on board Aquarius were not afforded the minimum standards required by UK legislation; of particular note: • Their hours of rest were not recorded • They continually worked in excess of 48 hours per week • They did not receive 4 weeks’ annual leave or compensatory leave; and • They did not get a 6-hour rest period during the 24 hours leading up to the accident. The Ghanaian crew members’ contracts of employment, issued by a UK manning agency, made no reference to the fishermen’s working time regulations, and did not include maximum hours of work, or annual and compensatory leave entitlements. The vessel’s British skippers took regular 10-day breaks, but the foreign nationals were expected to work and live on board Aquarius without any opportunity to take periods of compensatory leave. 2.11 VESSEL SAFETY MANAGEMENT 2.11.1 Vessel’s safety management system In accordance with the Merchant Shipping and Fishing Vessels (Health and Safety at Work) Regulations 1997, the owners and skippers of Aquarius had a general duty to ensure, as far as was reasonably practicable, the health and safety of their crew. In order to do this, they were required to evaluate unavoidable risks and take actions to minimise them. This included the adoption of safe working patterns and procedures. These requirements, along with a set of prescriptive safety standards, were repeated in the 15-24m Fishing Vessel Code. The owners and skippers of Aquarius used a paper copy of the Seafish safety folder to document the vessel’s risk assessments, procedures and equipment registers. However, it had been compiled prior to its fishing vessel certificate renewal survey in January 2013, and had not been amended or reviewed since. When reviewed, the safety folder was found to contain a minimal amount of vessel-specific information, its documented procedures lacked detail, and it was apparent that it had been hastily compiled in order to maintain the vessel’s UK fishing vessel certification. Aquarius’s poor safety inspection record, and the material condition of the vessel’s safety equipment at the time of the accident indicated that the skipper and owners had adopted a reactive approach to safety management, and took action to meet mandated safety standards only when prompted by deficiencies identified by MCA surveyors. In effect, the owners and skipper were using the MCA as a superintendence and safety management service. 2.11.2 Risk assessment The lack of risk assessments had been raised as deficiencies by MCA surveyors in four out of five inspections that took place on board between January 2011 and January 2013, and had been discussed with the skipper at the time. When the vessel’s safety folder was compiled, the owners relied solely on the generic risk assessments produced by Seafish.
39 Relevant to this accident, the task of marking the trawl was conducted on a regular basis, but a documented risk assessment had not been produced. The method used to mark the trawl warps at sea was unnecessarily hazardous, and the failure of the stopper and subsequent loss of a crewman overboard were entirely foreseeable. This specific risk was documented in The Fishermen’s Safety Guide (paragraph 1.16.3), which contained the following warning: Do not stand on a slack warp laid on the deck; if the ‘stopper’ chain slips, it may suddenly become tight, throwing you up and perhaps overboard. Had the task of re-marking the trawl warps at sea been subject to a risk assessment process, the difficulties of working with a lack of space, the danger zone within the bight of the warp, the application of an appropriate stopper, and the need to wear a PFD could have been identified. This might have prompted the skipper to avoid the risk and do the job before leaving port, or put plans in place to do the task in a much safer manner at sea. 2.11.3 Safety culture and its effect on behaviours The safety culture on board a vessel is the product of individual and group values, attitudes, perceptions, competencies, and patterns of behaviour that determine the crew’s commitment to health and safety management. The prevailing level of safety culture achieved on board a vessel will have a significant effect on the way tasks are done on board, and on what the crew do when no one is watching. In order to achieve a strong safety culture on board a fishing vessel, the skipper must demonstrate his commitment to safety management, and vigorously promote safe systems of work. If a skipper has a natural, unconscious bias for production over safety, or a tendency to focus on the short-term and on being highly reactive, a poor level of safety culture will prevail. Symptoms of poor cultural factors can include: • Widespread, routine procedural violations • Failure to comply with the vessel’s safety management system; and • Management decisions that appear to consistently prioritise the catching of fish over safety. On Aquarius, all three of these indicators had been present for a prolonged period of time, and it was evident that an extremely low level of safety culture existed on board. Safety management should not be considered an unnecessary burden; it should be a natural function of good vessel management. Boats with a strong safety culture are those that are well run, well maintained and employ well-trained crew. As a result, they typically have fewer deficiencies identified, fewer accidents and less resultant downtime. 2.12 CERTIFICATION PROCESS AND EQUIPMENT MAINTENANCE 2.12.1 Vessel owner’s annual self-certification process The owners of Aquarius were responsible for ensuring that the vessel was equipped, surveyed, certified, maintained and operated in accordance with the relevant provisions of the 15-24m Fishing Vessel Code. To assure themselves that the vessel continued to comply with the Code throughout its service, the owners or their
40 appointed representative were required to check the vessel annually. On completion of each annual check the owners should sign a declaration confirming compliance; this should be held on board the vessel for subsequent inspection. The annual self-certification process is fundamental to the UK’s approach to the certification of non-SOLAS (under 24m LOA) fishing vessels. However, no self- declaration forms were found on board Aquarius during its post-accident inspection. This shortcoming is not uncommon and, as highlighted in previous reports, MAIB inspectors often discover that annual self-certifications have either not been completed, or are not available for inspection. Following the Ronan Orla accident (paragraph 1.18.3), the MAIB recommended that the MCA requires vessel owners to submit copies of their self-declaration forms to the MCA for monitoring scrutiny. This recommendation was rejected by the MCA because it did not align with the agency’s 10 year strategy, which was to encourage fishermen to take more responsibility for their own safety. Notwithstanding this aspiration, at the time of this investigation it is evident that the annual inspection and self-certification process was not achieving its designed aim. 2.12.2 Regulatory oversight and the management of deficiencies In the 9 years prior to the accident, Aquarius was surveyed and/or inspected by MCA surveyors on nine separate occasions, the last being a targeted inspection on 21 March 2013. In total, 137 deficiencies were raised during this time, of which 65% were classed as safety-critical. Many of the deficiencies the MCA raised related to the management of safety, with similar problems being highlighted on a regular basis. The local MCA marine office had identified Aquarius as a problem vessel, and its surveyors had spent time explaining to the skipper the nature of the shortcomings they were finding. Despite these efforts, the guidance offered was not heeded and the longstanding safety management shortfalls were again evident during the MCA’s post-accident surveys. Deficiencies identified during surveys were recorded in the MCA’s electronic SIAS system. The closure of non-critical deficiencies relied largely on the honesty and integrity of vessel owners’ reports that rectification action had been completed. In the case of Aquarius, it was apparent that some of the deficiencies raised by the MCA were not properly addressed, but had been reported by the vessel’s agent as being rectified. The SIAS database could not automatically identify poor performers or alert surveyors when outstanding deficiencies had reached their time-bound limit. In order for a marine office to monitor a particular vessel, or fleet of vessels, a surveyor had to manually interrogate the SIAS database and/or review the paper files. Notwithstanding the MCA’s objective of encouraging fishermen to take responsibility for their own safety, it must have a robust system for following up on deficiencies raised during survey and inspection if it is to deal effectively with consistently sub-standard vessels.
41 SECTION 3 - CONCLUSIONS 3.1 SAFETY ISSUES DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMENDATIONS
The casualty was thrown overboard when a rope stopper that had been applied to a steel wire warp suddenly failed. [2.2]
It is likely that the rope used to create the stopper parted under tensile overload; the material condition of the rope used to create the stopper, and the method used to apply it were significant contributing factors. [2.3]
The casualty was thrown overboard because he had positioned himself within the bight of the slackened warp. [2.5]
The actions taken by the skipper and his crew to recover the casualty were not in line with the guidance provided by the MCA for a manoverboard situation, and fell well short of standard responses taught on training courses. Of particular note, the alarm was not raised until after the crewman had sunk below the surface of the water. [2.6]
Aquarius and its crew were not properly prepared to deal with the emergency situation. The vessel was not effectively equipped to recover a person from the sea, its safety equipment was not properly maintained, its emergency procedures lacked detail, and its crew had not practised manoverboard recovery. [2.7] 3.2 SAFETY ISSUES NOT DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS
Marking a trawl warp by streaming it over the stern of the vessel while underway was unnecessarily hazardous. With proper planning, a safer way of achieving the task could have been identified and the accident could easily have been avoided. [2.4.1]
The crew were all experienced fishermen, but the standard of basic seamanship demonstrated by them was extremely low. The material used to create the stopper and the way it was applied increased the risk of its failure. [2.4.2]
The casualty sank and his body was not recovered because he was not wearing a lifejacket or other type of PFD when he entered the water. [2.8]
Aquarius’s crew were being worked extremely hard for prolonged periods of time. Tiredness and a desire to rest ahead of a busy day’s fishing almost certainly influenced the crew’s approach to the task of marking the trawl warps. [2.9]
Aquarius’s British skipper’s took regular 10-day breaks, but the foreign nationals employed as crew were expected to live and work on board the vessel without any opportunity to take periods of compensatory leave. [2.10]
The skipper and owners of Aquarius adopted a reactive approach to safety management, and took action to meet mandated safety standards only when prompted by deficiencies identified by MCA surveyors. [2.11.1]
42
The accident could have been avoided if the risks of undertaking this task had been properly assessed, and the danger zone formed by the bight of the warp had been identified. [2.11.2]
The skipper and owners of Aquarius consistently prioritised the catching of fish over the safety of the vessel and its crew. This resulted in the promotion of a poor safety culture. [2.11.3]
The skipper and owners had not completed annual self-assessment declarations. Previous investigations have identified that this regulatory shortcoming is endemic across the UK’s under 24m fishing vessel fleet. [2.12.1]
The MCA’s database does not facilitate the identification and targeting of higher risk fishing vessels of under 24m for inspections. Nor does it alert surveyors to outstanding deficiencies to ensure their timely closure. [2.12.2]
43 SECTION 4 - ACTIONS TAKEN 4.1 MAIB ACTIONS The Marine Accident Investigation Branch has:
Published a Safety Flyer (Annex I) to disseminate the main lessons from this accident to the fishing industry 4.2 ACTIONS TAKEN BY OTHER ORGANISATIONS MB Aquarius Ltd has:
Purchased a manoverboard recovery cage and undertaken in-harbour drills and discussions with crew on its deployment and use.
Commenced recording of hours of work and rest for the vessel’s staff.
Amended the work pattern of Aquarius to 10-days on and 5-days off routine.
Changed the work contracts for the deckhands to facilitate back-to-back rota.
Appointed a mate and senior deck hand.
Implemented the use of the SFF safety management system to help improve safety management on board.
Reviewed and updated its risk assessments and recorded such in the Seafish Safety Folder.
Implemented mandatory wearing of PFDs when working on deck. The Maritime and Coastguard Agency has:
Begun to transfer its electronic files, including survey reports and deficiency records to the Single Vessel Database section of the Consolidated European Reporting System. On completion its SIAS database will be discontinued.
44 SECTION 5 – RECOMMENDATIONS The Maritime and Coastguard Agency is recommended to: 2016/139 Develop the capability within its new Consolidated European Reporting System/Single Vessel Database to automate the management of inspection and survey deficiency records so that consistently sub-standard vessels can be quickly identified and targeted, and marine offices are alerted if deficiencies are not rectified within stipulated time frames. 2016/140 Review its monitoring and enforcement of “The Working Time: Sea Fishermen Regulations 2004” to ensure that fishermen, and in particular foreign fishermen living on board their vessels, are achieving the statutory levels of rest and annual leave. The owners of Aquarius are recommended to: 2016/141 Conduct a thorough review of the vessel’s safety management system and take robust actions to improve the safety culture on board Aquarius and any other vessels they might own or operate. Particular attention should be given to ensuring compliance with all appropriate health and safety regulations, the 15-24m FV Code and the hours of work and rest regulations. 2016/142 Ensure that Aquarius and its crew are properly prepared to deal with emergency situations through the conduct of regular and realistic emergency drills. PG Manning Ltd is recommended to: 2016/143 Amend its fishermen’s contracts of employment to include reference to The Working Time: Sea fishermen Regulations 2004 and the employees’ hours of rest and leave entitlements. Safety recommendations shall in no case create a presumption of blame or liability
Marine Accident Report
FD06049 | 2017_英国_gas-explosions-on-general-cargo-ship-nortrader-with-1-person-injured__MAIBInvReport26_2017.pdf
分类:06_境外及港澳台调查报告 | 年份:2017 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
M A R I N E A C C I D E N T I N V E S T I G AT I O N B R A N C H ACCIDENT REPORT SERIOUS MARINE CASUALTY REPORT NO 26/2017 DECEMBER 2017 Report on the investigation of the explosion of gas released from a cargo of unprocessed incinerator bottom ash on Nortrader at anchorage in Plymouth Sound on 13 January 2017
Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2017 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. All MAIB publications can be found on our website: www.gov.uk/maib For all enquiries: Marine Accident Investigation Branch First Floor, Spring Place 105 Commercial Road Southampton Email: maib@dft.gsi.gov.uk United Kingdom Telephone: +44 (0) 23 8039 5500 SO15 1GH Fax: +44 (0) 23 8023 2459 Press enquiries during office hours: 01932 440015 Press enquiries out of hours: 020 7944 4292
CONTENTS GLOSSARY OF ABBREVIATIONS AND ACRONYMS SYNOPSIS 1 SECTION 1 - FACTUAL INFORMATION 2 1.1 Particulars of Nortrader and accident 2 1.2 Narrative 4 1.2.1 Instructions to load 4 1.2.2 Cargo loading and anchorage 4 1.2.3 Explosions in the cargo hold 6 1.2.4 Post-accident response 7 1.2.5 Damage 8 1.2.6 Post-accident actions 8 1.3 Vessel 11 1.3.1 Cargo hold 11 1.3.2 Hatch covers 12 1.3.3 Forecastle store 12 1.4 Crew 12 1.5 Unprocessed incinerator bottom ash 12 1.5.1 Production and storage 12 1.5.2 Sea transportation 14 1.6 Organisations involved in transportation of U-IBA 14 1.6.1 Vessel owners 14 1.6.2 Disponent owner of the vessel 14 1.6.3 Shipper of the cargo 16 1.7 Regulations and guidance for the carriage of bulk cargo 16 1.7.1 SOLAS Convention 16 1.7.2 International Maritime Solid Bulk Cargoes Code 16 1.7.3 Further guidance on the application of the International Maritime Solid
Bulk Cargoes Code 18 1.7.4 National regulations 18 1.8 Competency examination syllabus for senior deck officers 18 1.9 Vessel safety management system 20 1.10 Vessels certified to carry dangerous cargo 20 1.11 Regulations and guidance for waste management 20 1.11.1 Waste classification 20 1.11.2 Testing protocol for waste classification 21 1.11.3 Environment Agency regulations 21 1.11.4 Material safety data sheet for U-IBA 22 1.12 Tests 22 1.12.1 United Nations Manual of Tests and Criteria 22 1.12.2 Gas generation potential and homogeneity of U-IBA 23 1.12.3 MVV Environment Devonport tests 24 1.13 Burgoynes & Partners investigation 26 1.14 Estimation of potential hydrogen production 26 1.14.1 Production of hydrogen 26 1.14.2 Study to estimate hydrogen volume 26 1.15 Previous/similar accidents 27 1.15.1 Accidents at sea 27 1.15.2 Accidents ashore 27
SECTION 2 - ANALYSIS 28 2.1 Aim 28 2.2 The explosion 28 2.2.1 Conditions for the explosion 28 2.2.2 Connection between cargo hold and forecastle store 28 2.2.3 Ignition leading to explosions 29 2.3 Decision to load 29 2.3.1 Precedent 29 2.3.2 Master 29 2.3.3 Shipper 29 2.3.4 UK regulations 30 2.4 Uniqueness of cargo or vessel 30 2.4.1 Cargo 30 2.4.2 Vessel 30 2.4.3 Conclusion 31 2.5 Classification of U-IBA 31 2.5.1 Carriage of U-IBA by sea 31 2.5.2 Classification of U-IBA ashore 31 2.6 Adequacy of United Nations Test N.5 31 2.6.1 Non-replicability of test results 31 2.6.2 Rate of release of flammable gas 32 SECTION 3 - CONCLUSIONS 33 3.1 Safety issues directly contributing to the accident that have been addressed or resulted in recommendations 33 3.2 Safety issues not directly contributing to the accident that have been addressed or resulted in recommendations 33 SECTION 4 - ACTION TAKEN 34 4.1 MAIB actions 34 4.2 Actions taken by other organisations 34 SECTION 5 - RECOMMENDATIONS 35
FIGURES Figure 1
Nortrader at Victoria Wharf, Plymouth Figure 2
Location of the accident Figure 3
Forecastle deck and entrance to forecastle store
Figure 4
Emergency fire pump starter panel (inset: reverse of door, showing broken door lug) Figure 5
The chief engineer’s burnt parka coat Figure 6
Damage caused by the explosion Figure 7
Evidence of short-lived heat damage
Figure 8
Cargo hold lamp access (insets: views from forecastle store with maintenance hatch closed and removed) Figure 9a
General arrangement of the vessel Figure 9b
Hatchcovers undergoing temporary repairs Figure 10
U-IBA from Nortrader after the explosion Figure 11
Quick guide to IMSBC Code Figure 12
Comparison of U-IBA sample from Nortrader with national averages (extracted from the WRc report) TABLES Table 1
Comparison of test results of U-IBA loaded on Nortrader
ANNEXES Annex A
IMSBC Code - schedule entry for aluminium smelting/remelting by- products Annex B
IMSBC Code - 16 point cargo information list and cargo declaration form Annex C
Carrying solid bulk cargoes safely - booklet Annex D
Material Safety Data Sheet for U-IBA Annex E
UN Test N.5, extract from the UN Manual of Tests and Criteria
Annex F
Marchwood Scientific Services flammable gas release test reports Annex G
Report by The Hydrogen Hazards Unit, London Southbank University
Annex H
MAIB safety flyer
GLOSSARY OF ABBREVIATIONS AND ACRONYMS BC Code
Code of Safe Practice for Solid Bulk Cargoes BCSN
Bulk Cargo Shipping Name DOC
Document of compliance EA
Environment Agency ESA
Environment Services Association EU
European Union EWC
European Waste Catalogue H&V
Hudig & Veder BV H2
Chemical formula of hydrogen gas H2O
Chemical formula of water HHU
Hydrogen Hazards Unit HP
Hazard property IBA
Incinerator bottom ash IMDG Code
International Maritime Dangerous Goods Code IMO
International Maritime Organization IMSBC Code
International Maritime Solid Bulk Cargoes Code INTERCARGO - International Association of Dry Cargo Ship Owners l/kg/hour
litres per kilogramme per hour LoW
List of Wastes MARPOL
[MARPOL 73/78] International Convention for the Prevention of Pollution from Ships, 1973 as modified by the Protocol of 1978 MBL
Minimum breaking load MCA
Maritime and Coastguard Agency MGN
Marine Guidance Note MIN
Marine Information Note MSDS
Material Safety Data Sheet MVVD
MVV Environment Devonport Limited NH3
Chemical formula of ammonia
NLS
The Environment Agency’s National Laboratory Services PH3
Chemical formula of phosphene SMS
Safety Management System SOLAS
International Convention for the Safety of Life at Sea 1974, as amended SR
Standard Rules
STCW
International Convention on Standards of Training, Certification and Watchkeeping for Seafarers 1978, as amended (STCW Convention) t
tonnes TC
Time charter U-IBA
Unprocessed incinerator bottom ash UN
United Nations UN Test N.5
United Nations Test method for substances which in contact with water emit flammable gases VHF
Very high frequency
WM3
Guidance on the classification and assessment of waste, Technical Guidance WM3 TIMES: all times used in this report are UTC unless otherwise stated.
1 SYNOPSIS At 1447 on 13 January 2017, the Antigua & Barbuda registered dry cargo vessel Nortrader suffered two explosions in quick succession while anchored in Plymouth Sound, England. The vessel was loaded with a cargo of 2333 tonnes of unprocessed incinerator bottom ash. The first explosion was in the forecastle store and the second in the cargo hold. The chief engineer, who was inside the forecastle store at the time, suffered second degree burns and was airlifted to a nearby hospital. He was repatriated to Ukraine after 12 days and was declared fit for duty 4 months later. The vessel suffered extensive damage and was out of service until 20 April. The MAIB investigation established that the explosions were caused by the ignition of hydrogen gas released from the cargo. Prior to this accident there had been 34 similar shipments of incinerator bottom ash from Plymouth to the Netherlands and, despite it not being listed in the International Maritime Solid Bulk Cargoes Code, no steps had been taken to seek approval from the competent authorities for its carriage. The investigation also found that the testing protocols in place for assessing if the waste was capable of producing flammable gases were inappropriate and inadequate. The MAIB has published a safety flyer to disseminate the lessons from this accident and improve awareness of the International Maritime Solid Bulk Cargoes Code. The MAIB has also provided the Maritime and Coastguard Agency with the results of laboratory tests and technical research conducted during the investigation. The Maritime and Coastguard Agency has set up tripartite agreements between the UK, the Netherlands and several other administrations for the safe carriage of incinerator bottom ash and proposed its inclusion in the International Maritime Solid Bulk Cargoes Code. The Maritime and Coastguard Agency has been recommended to update the Merchant Shipping (Carriage of Cargoes) Regulations to refer to the International Maritime Solid Bulk Cargoes Code and to work with the Environment Agency to ensure that test protocols for the classification of cargoes are fit for purpose. Recommendations have also been made to Nortrader’s owners to review their safety management system to reflect the requirements of the International Maritime Solid Bulk Cargoes Code.
2 SECTION 1 - FACTUAL INFORMATION 1.1 PARTICULARS OF NORTRADER AND ACCIDENT SHIP PARTICULARS Vessel’s name Nortrader Flag Antigua & Barbuda Classification society Bureau Veritas IMO number 9557393 Type Dry cargo Registered owner NTO Shipping GmbH & Co.KG Manager(s) NTO Shipping GmbH & Co.KG Construction Steel Year of build 2012 Length overall 87.91m Gross tonnage 1934 tonnes Minimum safe manning 6 Authorised cargo General cargo VOYAGE PARTICULARS Port of departure Plymouth, England Port of arrival Beverwijk, the Netherlands (intended) Type of voyage Short international Cargo information 2333t of unprocessed incinerator bottom ash Manning 7 MARINE CASUALTY INFORMATION Date and time 13 January, 1447 Type of marine casualty or incident Serious Marine Casualty Location of incident Plymouth Sound, England Place on board Cargo hold Injuries 1 Damage/environmental impact Material damage to ship, no environmental impact Ship operation Normal service Voyage segment Anchored External environment Calm seas, light breeze, good visibility, occasional rain Persons on board 7
3 Nortrader
4 1.2 NARRATIVE 1.2.1 Instructions to load On 10 January 2017, the master of Nortrader received instructions by email to load a full cargo of unprocessed incinerator bottom ash (U-IBA) at Plymouth, England for Beverwijk in the Netherlands. The email was sent from Hudig & Veder Chartering BV (H&V), a company based in the Netherlands. It specified that the cargo was non dangerous and stated: …cargo also include some foreign materials which is no problem. Cargo can be loaded/discharged in rain. [sic] On receipt of these instructions, the master and chief officer referred to the International Maritime Solid Bulk Cargoes Code (IMSBC Code), but did not find an entry for U-IBA. The master decided to load as instructed, and did not receive any further information about the cargo. 1.2.2 Cargo loading and anchorage Nortrader berthed at Victoria Wharf, Plymouth, at 0655 on 12 January. Loading commenced at 0815, and by 1600 that day 2333t of U-IBA had been loaded in heavy and persistent rain (Figure 1). After completion of the final draught survey, the master checked the weather forecast and decided to anchor off Plymouth and wait for the imminent bad weather to pass. At 1900, the vessel left the berth and anchored 30 minutes later in Plymouth Sound (Figure 2). Figure 1: Nortrader at Victoria Wharf, Plymouth
5 Figure 2: Location of the accident Vessel anchoring position Reproduced from Admiralty Chart BA 1900-0 by permission of the Controller of HMSO and the UK Hydrographic Office
6 1.2.3 Explosions in the cargo hold The following morning, on the bridge, the chief officer instructed the bosun to wash the deck and superstructure. The chief engineer, also present on the bridge at the time, requested that the bosun use the electric emergency fire pump for the task in order to test it. The bosun started the emergency fire pump from the bridge, but a short while later he reported to the chief engineer that it was not delivering any water. He then changed over to the main fire pump and the crew completed washing by 1200. At approximately 1440, the chief engineer went to the forecastle store (Figure 3) where the emergency fire pump main starter panel was located. He opened the door to enter the store and used the hook on its outside to secure the door in the open position. He then went down the ladder into the store and started the emergency fire pump. From the sound of its operation he suspected that the pump was running dry and so he returned to the forecastle and opened a fire hydrant, to confirm that no water was being pumped. He then returned to the store and stopped the emergency fire pump using the stop button on the starter panel (Figure 4). As soon as he stopped the pump, there were two loud explosions in quick succession. The fire detection system registered this event at 1447. The first explosion threw the chief engineer onto the emergency fire pump starter panel. The second explosion pushed him violently backwards and he fell on the deck under the starter panel. Figure 3: Forecastle deck and entrance to forecastle store Entrance to forecastle store Cargo hold vent fan suction
7 1.2.4 Post-accident response At the time of the accident, the third officer was on watch. On hearing the explosions, the master and the rest of the crew immediately came to the bridge. They saw the chief engineer staggering along the starboard side of the main deck between the cargo holds and shipside protective railing. The bosun met him halfway between the forecastle and the accommodation, and escorted him to the mess room. The synthetic fibre-filled parka1 coat that the chief engineer had been wearing had melted onto his body and head. He was conscious and complained of being in extreme pain. Once in the mess room, the chief officer cut the chief engineer’s coat off him (Figure 5) and attempted to make him comfortable. The master called the coastguard using very high frequency (VHF) radio to inform them about the explosions and asked for immediate medical assistance for the chief engineer. By 1531, rescue helicopter R924 was in position above the vessel. A paramedic was landed on board Nortrader and, following a quick assessment, the chief engineer was lifted into the helicopter and evacuated to Derriford Hospital in Plymouth from where he was subsequently transferred to the Acute Burns Clinic 1 Parka coat: a coat used in cold weather usually stuffed with a synthetic fibre or down. Figure 4: Emergency fire pump starter panel (inset: reverse of door, showing broken door lug)
8 at Southmead Hospital, Bristol. He had suffered first degree burns to his face and second degree burns to his body, both hands and lower extremities. On 25 January, he was discharged and repatriated to Ukraine, where his treatment was continued for 3 weeks. He was declared fit for duty in May 2017. 1.2.5 Damage The explosions dislodged and distorted all nine of the vessel’s steel hatch covers, breaking all but one of the 66 hatch cleats in the process (Figure 6). Some of the hatch covers dropped into the cargo hold and were found resting on top of the cargo. The cargo hold coaming bar was also damaged in several locations and the cargo ventilation trunking tower flaps were deformed. There was no fire damage, although there was evidence of intense heat within the forecastle store. A parka coat, like that worn by the chief engineer, which had been hung at the entrance to the forecastle store, had been severely melted and several laminated sheets and plastic document wallets were heat damaged (Figure 7). 1.2.6 Post-accident actions A Maritime and Coastguard Agency (MCA) surveyor inspected Nortrader while still at anchor and gave the master permission to return to Plymouth. On 14 January, Nortrader berthed at Victoria Wharf, and over the next 3 days discharged the entire cargo. The cargo was returned to the storage shed at Victoria Wharf. The MCA prohibited further sea transportation of U-IBA from the UK until the procedures described in the IMSBC Code for cargoes not listed in it had been completed. Figure 5: The chief engineer’s burnt parka coat
9 Figure 6: Damage caused by the explosion Dislodged hatch covers Distorted hatch covers Broken cleat
10 Figure 7: Evidence of short-lived heat damage
11 Nortrader’s Classification Society, Bureau Veritas, carried out a damage assessment survey, which concluded that the vessel had not sustained any structural damage, and it was granted a dispensation to sail to Rotterdam for repair. Five of the nine hatch covers were replaced along with all of the hatch cleats and the cargo hold coaming bar. The cargo ventilation trunking tower flaps were repaired. The vessel returned to service on 20 April. 1.3 VESSEL 1.3.1 Cargo hold Nortrader had a single cargo hold of 3409m3 capacity. It was possible to sub-divide the hold with two movable bulkheads. At the time of the accident, the bulkheads were not in use and were stored at the aft end of the hold. There were two forced draught fans for ventilation. These were not in use and their inlets had been closed and dogged down after loading, in preparation for poor weather. There were two cargo lamps at the forward end of the hold. The access to the starboard lamp was from within the forecastle store. The access plate for this was found loosely fitted using two of ten bolts, and the sealing gasket was missing (Figure 8). The previous cargo carried by the vessel had been cattle feed. After this cargo was discharged, the holds had been washed clean and ventilated. Figure 8: Cargo hold lamp access (insets: views from forecastle store with maintenence hatch closed and removed)
12 1.3.2 Hatch covers The hold had eight large hatch covers each weighing 14t, and a smaller central one weighing 5t. These hatch covers were made tight against the coaming bars with 66 hatch cleats that had minimum breaking loads (MBL) of 8.75t (athwartships cleats) and 9.0t (longitudinal cleats). There were also 40 steel wedges (3.5t MBL) used to interlock the tops of adjacent hatch covers (Figure 9a and b). 1.3.3 Forecastle store The forecastle store was located in a compartment forward of the hold. It was accessed via a door on the forecastle deck and down a short stairway. The starter panels for various equipment, including the emergency fire pump and cargo hold ventilation fans, were located in the forecastle store. The emergency fire pump and bow thruster were located at the bottom of the compartment and were accessed by a vertical ladder from the store. At the time of the accident, the emergency fire pump starter panel door was not properly closed as one of its two fastening lugs was broken. The forecastle store was used to store consumables for deck maintenance. The rope and paint stores were located forward of the forecastle store and both stores were open to each other. The store was naturally ventilated by gooseneck vent pipes to the forecastle above. On the day of the accident, all these vents had been closed in preparation for heavy weather. 1.4 CREW Nortrader’s crew comprised the master, chief officer, third officer, chief engineer and three ratings from the Russian Federation and Ukraine. Their contracts were 4 months long, and none of them had any previous experience on ships carrying U-IBA. The master held an STCW2 II/2 (unlimited) certificate of competency gained in 1991 and had completed six contracts as master on Nortrader. He was 59 years old. The chief engineer was 31 years old and held an STCW III/2 (unlimited) chief engineer’s certificate of competency. He had completed four contracts on Nortrader and had last joined the vessel in September 2016. 1.5 UNPROCESSED INCINERATOR BOTTOM ASH 1.5.1 Production and storage U-IBA is the ash accumulated at the bottom of the furnace when waste material is incinerated. The cargo of U-IBA loaded onto Nortrader was generated at the incinerator plant owned and operated by MVV Environment Devonport Limited (MVVD) located in Devonport, Plymouth. MVVD started operating in June 2015 and handled approximately 250,000t of non-recyclable waste in a year, which included 80,000t of commercial waste. Waste from the Plymouth and Torbay areas and Devon County Council was incinerated at the plant and the heat energy produced was recovered in a combined heat and power plant. The waste was not sorted prior to incineration. 2 International Convention on Standards of Training, Certification and Watchkeeping for Seafarers 1978, as amended (STCW Convention).
13 Figure 9a: General arrangement of the vessel Emergency fire pump Position of chief engineer just before the explosion Figure 9b: Hatch covers undergoing temporary repairs 5t centre section Steel locking wedges Coaming bar
14 At the time of the accident, there were 32 operational municipal waste incineration plants in the UK. All of these except for MVVD processed their incinerator bottom ash (IBA) either on site, or off-site within the UK. Transportation to off-site processing plants was carried out using open top or tarpaulin covered freight lorries. Other than during initial start-up, the combustion in the furnace was sustained entirely by the waste, and the furnace temperature ranged from 800°C to 1100°C. On leaving the furnace the IBA was quenched in water before being stored in an open bunker adjacent to the incinerator. The cargo discharged from Nortrader was typical of the U-IBA from the MVVD facility and included items such as unburnt paper, domestic gas cylinders and wheels from motor vehicles (Figure 10). Approximately 200t of U-IBA per day was transferred by freight lorries to the storage shed at Victoria Wharf in Plymouth. The shed had a maximum capacity of 4000t and was naturally ventilated by its open front. The U-IBA was stored in a large pile in the shed where old and new batches were not segregated. 1.5.2 Sea transportation Since MVVD started operating in June 2015, there had been 34 shipments of U-IBA from Plymouth to Beverwijk on 26 vessels similar in tonnage to Nortrader. The description of the cargo for all shipments had been identical to that provided during the engagement of Nortrader. More than a third of these vessels had the document of compliance (DOC) required to carry dangerous goods, although this was not a requirement of the charter party3 agreement for shipment. The first shipment of U-IBA employed the vessel Kine, which had a DOC for dangerous cargoes. On that occasion, H&V acted as a broker between the ship owner and the shipper of the cargo, Rock Solid BV. The material safety data sheet (MSDS) for U-IBA was provided to Kine. After the first shipment, except when masters of vessels specifically requested for it, the MSDS was not sent to the vessels. 1.6 ORGANISATIONS INVOLVED IN TRANSPORTATION OF U-IBA 1.6.1 Vessel owners Nortrader’s registered owner was NTO Shipping GmbH based in Germany. NTO Shipping GmbH owned and operated 18 vessels, and was part of the EMS-Fehn Group, which offered services including logistics, forwarding, port operation and crewing. 1.6.2 Disponent owner of the vessel From 15 December 2016 Nortrader was on time charter to Hudig & Veder (H&V), a shipping company based in Rotterdam, making it the disponent4 owner of the vessel. H&V offered a variety of services including chartering, cargo inspection, stevedoring and port agency. It also owned nine ships similar in construction and size to Nortrader. 3 A charter party is the contract between the owner of a vessel and the charterer for the use of a vessel. 4 The disponent owner is a person or company that assumes the legal responsibilities of the registered owner of the vessel during the term of a time charter or bareboat charter.
15 Figure 10: U-IBA from Nortrader after the explosion Unburnt paper
16 On 10 January 2017, H&V chartered Nortrader to the shipper, Rock Solid BV, for a single voyage to load U-IBA at Plymouth on 12 January for discharge at Beverwijk. The charter party agreement described the cargo as follows: a full and complete cargo avi-slakken (bodem as) stw dw in bulk, untreated incinerator bottom ash in bulk, cargo non dangerous, non-imo classed. [sic] H&V acted as brokers for the first shipment of U-IBA from Plymouth. For the following 33 shipments they either used their own vessels or engaged vessels on short-term charters. 1.6.3 Shipper of the cargo The shipper was Rock Solid BV, a company based in the Netherlands that specialised in processing U-IBA to recover mineral residues. The remainder of the ash was prepared for use in the road building and construction industries, landfill and the production of fertilisers. MVVD and Rock Solid BV had agreed a contract that committed MVVD to supply Rock Solid BV with 68000t of U-IBA annually. Rock Solid BV took ownership of the U-IBA at the point of production and was responsible for transporting it from MMVD to its processing facility at Alkmaar in the Netherlands. The Bill of Lading5 for the cargo loaded on Nortrader showed MVVD as the shipper, but for all practical purposes Rock Solid BV was the shipper of the cargo. 1.7 REGULATIONS AND GUIDANCE FOR THE CARRIAGE OF BULK CARGOES 1.7.1 SOLAS Convention The International Convention for the Safety of Life at Sea 1974, as amended (SOLAS) Chapter VI ‘Carriage of Cargoes’, parts A and B contains the mandatory provisions concerning the carriage of bulk cargoes. It requires the governments involved in the transportation chain to provide information regarding the cargo, including the precautions required for its safe carriage. SOLAS refers to the IMSBC Code for further information about the cargo and requirements for its safe carriage. 1.7.2 International Maritime Solid Bulk Cargoes Code The IMSBC Code entered into force on 1 January 2011 under the provisions of the SOLAS Convention. Appendix 1 of the Code, Individual schedules of solid bulk cargoes, listed all solid cargoes permitted to be shipped in bulk and provided a schedule of requirements for the safe handling and carriage for each. The Code also grouped cargoes according to the hazards associated with their carriage6. Those in groups A or B were also entered into the International Maritime Dangerous Goods (IMDG) Code. An example of a schedule for a cargo that can develop small quantities of hydrogen and ammonia, aluminium smelting/remelting by-products, processed, is at Annex A. 5 A bill of lading is a legal document between the shipper and the carrier providing details of the quantity, type and destination of the cargo, and also serves as a receipt of shipment. 6 Group A consisted of cargoes that may liquefy if shipped at a moisture content in excess of their transportable moisture limit. Group B consisted of cargoes that posed a chemical hazard which could give rise to a dangerous situation on a ship. Group C consisted of cargoes that did not belong to Groups A or B.
17 Section 4.2.2 of the IMSBC Code contained a list of information about the intended solid bulk cargo that the shipper was to provide to the master prior to loading. Of the 16 items on this list, item 1 was the bulk cargo shipping name (BCSN) if listed in the IMSBC Code, item 2 was the cargo group (A, B, A and B, or C) and item 14 was properties on emission of flammable gases in contact with water, if applicable. The MSDS was not part of the required information. In addition to this list of information, the shipper was required to provide the master with a completed and signed cargo declaration form (Annex B). Solid bulk cargoes not listed in Appendix 1 of the IMSBC Code were not permitted to be loaded until the competent authority at the loading port had authorised the intended cargo. In the UK, the competent authority was the MCA and the procedure to be followed was stated in Marine Guidance Note (MGN) 512, Solid Bulk Cargoes
- Guidelines for the submission of information and completion of the format for the
properties of cargoes not listed in the International Maritime Solid Bulk Cargoes (IMSBC) Code and their conditions of carriage, issued in June 2014. This note was specifically aimed at all ship owners, ship operators, terminal operators, port authorities, classification societies, agents, charterers, shippers, consignors, masters and all other parties involved in the transport of solid bulk cargoes by sea. At section 1.1 it stated: Shippers of solid bulk cargoes intended for carriage and which are not listed in appendix 1 of the International Maritime Solid Bulk Cargoes (IMSBC) Code, are required, prior to loading, to provide the Competent Authority of the port of loading with the characteristics and properties of the cargo in accordance with Section 4 of the Code. The International Maritime Organization’s (IMO) Marine Safety Committee (MSC) Circular 1453, Guidelines for the submission of information and completion of the format for the properties of cargoes not listed in the International Maritime Solid Bulk Cargoes (IMSBC) Code and their conditions of carriage provided a questionnaire to aid the gathering of information about an intended cargo. The application of these guidelines became mandatory on 1 January 2015. Under Hazardous properties, the questionnaire contained the following question: Does the cargo react with water causing toxic or flammable gases to be released? Which gases? How toxic or flammable are the gases? What is the rate of evolution? If the proposed cargo was assessed to belong to group A or B of the IMSBC Code, the competent authorities at the ports of loading and discharge, along with the Flag State of the intended vessel were required to agree conditions for the carriage of that cargo; this was known as a tripartite agreement. If the proposed cargo was assessed to belong to Group C in the IMSBC Code, the competent authority was able to permit the carriage without involving other parties. Between the introduction of the IMSBC Code in 2011 and this accident, the MCA had not received any request or enquiry concerning the carriage of cargoes not included in the IMSBC Code.
18 1.7.3 Further guidance on the application of the International Maritime Solid Bulk Cargoes Code In addition to the guidance provided by MGN 512 and IMO MSC Circ.1453, Lloyd’s Register, UK P&I Club and the International Association of Dry Cargo Ship Owners (INTERCARGO) published Carrying solid bulk cargoes safely, included at Annex C. This straightforward guide on the application of the IMSBC Code stated in its introduction: Before you can accept a cargo for shipment, the shipper must provide the Master with valid, up-to-date information about the cargo’s physical and chemical properties. The exact information and documentation they must provide is listed in the Code under ‘Assessment of acceptability of consignments for safe shipment; Provision of Information’, and includes the correct Bulk Cargo Shipping Name and a declaration that the cargo information is correct. A loading flowchart contained in this guide provided clear guidance to the seafarer on the steps required to be taken before agreeing to load solid bulk cargoes (Figure 11). 1.7.4 National regulations The UK’s Merchant Shipping (Carriage of Cargoes) Regulations 1999 (Statutory Instrument 336) stated: The owner and master of every ship to which these Regulations apply, other than a ship engaged in the carriage of grain, shall ensure that appropriate documentation, relevant to the cargo and its stowage and securing, which should specify in particular the precautions necessary for the safe carriage of that cargo by sea, is carried on board… The regulation referred to the Code of Safe Practice for Solid Bulk Cargoes (BC Code). The BC Code was superseded by the IMSBC Code in January 2011 but the regulation had not been updated to reflect this. In contrast with the IMSBC Code, the BC Code provided non-mandatory guidance and did not require masters to take action before loading a non-listed cargo. The MCA published Marine Information Note (MIN) 349, Solid Bulk Cargoes – Adoption of the International Maritime Solid Bulk Cargoes (IMSBC) Code in 2009 advising the industry, including ship owners, managers, masters and officers that the application of the IMSBC Code would become mandatory through SOLAS Convention (as amended) from 1 January 2011. This MIN expired on 31 May 2010. 1.8 COMPETENCY EXAMINATION SYLLABUS FOR SENIOR DECK OFFICERS The STCW syllabus for chief officers and masters required, under the heading Cargo handling and stowage at the management level, that candidates demonstrate the: Ability to establish procedures for safe cargo handling in accordance with the provisions of the relevant instruments such as IMDG Code, IMSBC Code, MARPOL7 73/78 Annexes III and V and other relevant information. 7 MARPOL: International Convention for the Prevention of Pollution from Ships
19 Carrying solid bulk cargoes safely © Lloyd’s Register/UK P&I Club/Intercargo, 2013 Page 18
Shipper has delivered all required cargo information? IMSBC Code consulted regarding cargo and associated hazards? Master and crew have the necessary ship data and information to prepare ship for loading? Cargo spaces inspected and prepared for cargo loading and stowage? Is the cargo categorised as ‘dangerous goods in solid form in bulk’ by SOLAS regulation VII/7? Does the Master have a special list/manifest/stowage plan identifying its location, are there instructions on board for emergency response, and does the ship have a ‘Document of Compliance for the Carriage of Dangerous Goods’? Has the Loading Plan been agreed with the Master and terminal representative? Are there instructions to suspend the loading/unloading operation if the ship’s limits are exceeded, or are likely to be exceeded if continued? YES YES LOAD (monitoring the cargo loading operation) A B C Not listed in IMSBC Code? NO TML Certificate? Moisture content (MC) declaration? MC lower than TML? Cargo spaces free from liquids? Visual monitoring conducted? Trimming considered? Stowage/segregation acceptable? Atmospheric conditions suitable and monitoring tools operational? Applicable dust precautions in place? Ventilation meets operational and IMSBC requirements? Competent authority has provided the Master with certificate stating carriage requirements (if Group A or B, agreed by authority of port of unloading and flag)? IMSBC Cargo Schedule consulted? Applicable precautions taken? DO NOT LOAD Cargo Group? NO NO NO NO NO NO NO NO Loading flowchart – follow the steps to see if it is safe to load your cargo Figure 11: Quick guide to IMSBC Code
20 1.9 VESSEL SAFETY MANAGEMENT SYSTEM The vessel’s safety management system (SMS) contained specific and detailed procedures concerning cargo operations under a section titled Procedure Cargo Operations. It stated that the master, with the assistance of the chief officer, was responsible for assisting the owner in meeting his obligation to receive, stow, carry safely and deliver the cargo. It further stated: In doing so, the reputation of the Owners and the Master will assure that the vessel is regarded as a reliable carrier … Such a good reputation has a positive financial effect both in the freight business and with insurance companies. Under the sub-section titled Cargo Acceptance, further instructions to the master were available to ensure the cargo was as specified, undamaged and the quantity as agreed. In the final section Dangerous Goods the SMS stated: The IMDG-Code and / or the IMSBC-Code (newest editions) are mandatory for the carriage of dangerous goods. There was no guidance in the SMS concerning the carriage of a cargo not included in the IMSBC Code. The SMS stated that the working language on board was English. 1.10 VESSELS CERTIFIED TO CARRY DANGEROUS CARGO SOLAS Chapter II-2 Regulation 19.4 listed the special requirements for vessels carrying dangerous goods. These included specific requirements for fire-fighting and detection systems, safety of electrical equipment (where permitted by the Administration to be fitted inside enclosed cargo spaces), personnel protection, bilge pumping and ventilation systems. Additionally, cable penetrations of decks and bulkheads were required to be sealed to prevent the passage of gas or vapour. The requirements for ventilation stated: Adequate power ventilation shall be provided in enclosed cargo spaces. The arrangements shall be such as to provide for at least six air changes… , and for removal of vapours from the upper or lower parts of the cargo spaces, as appropriate. 1.11 REGULATIONS AND GUIDANCE FOR WASTE MANAGEMENT 1.11.1 Waste classification European Union (EU) Directive 2008/98/EC on waste, generally known as the ‘Waste Framework Directive’, lays down the principles of waste management to prevent health risks to human beings and harm to the environment. The European Waste Catalogue (EWC) is a hierarchical list of waste descriptions. It is divided into 20 main chapters, each of which has a two-digit code between 01 and 20. IBA was coded as 19.01.12 and was not appended with an asterisk mark, indicating that it was not considered hazardous8. 8 Pursuant to Article 1(4) first indent of Directive 91/689/EEC.
21 The UK incorporated the guidance provided by the Waste Framework Directive into Guidance on the classification and assessment of waste, Technical Guidance WM3 (WM3). This document was jointly published by the Environment Agency (EA) in England and its equivalents in Scotland, Wales and Northern Ireland. WM3 provided step by step instructions for classifying waste as required by the List of Wastes (LoW) Regulations 2005, which itself was a transposition of the EWC into UK law. (The LoW Regulations 2005 were revoked in July 2015 and domestic legislation has since referred to the Waste Framework Directive.) In the LoW, U-IBA was classified as ‘mirror hazardous’, which implied that it could be either hazardous or non-hazardous depending on the results of regular testing. In the UK, incinerator operators who were members of the Environmental Services Association9 (ESA) undertook to test the U-IBA they produced on a monthly basis. 1.11.2 Testing protocol for waste classification To determine the classification of waste material, WM3 categorised 15 hazard properties (HP) numbered HP1 to HP15. Of these, HP3 defined the flammability of the waste product together with its ability to emit flammable gases in dangerous quantities when in contact with water. The threshold for categorising a product as dangerous was its ability to generate more than 1 litre of gas per hour per kg (l/kg/ hour). In 2012, the ESA developed a test protocol for identifying the hazards associated with U-IBA10, which was endorsed by the EA. Following the guidance provided in WM3, this protocol discounted six hazard properties including HP3. One of the sub categories of the discounted HP3 was HP3A: substances and preparations which in contact with water or damp air, evolve highly flammable gases in dangerous quantities. The ESA protocol justified the discounting of HP3 by stating the following: IBA has been through an incineration process and therefore compounds present in the ash are not flammable. The ESA protocol also recommended that full characterisation and assessment of the 15 hazard properties be undertaken annually; MVVD had not carried out such annual tests. MVVD was not a member of the ESA and contracted out all its U-IBA testing to Marchwood Scientific Services, also not a member of the ESA. However, as the ESA protocol was the only available guidance for U-IBA testing, it was universally followed by members and non-members of ESA, including Marchwood Scientific Services. Before this accident, none of the waste incineration facilities in the UK tested U-IBA for HP3. 1.11.3 Environment Agency regulations The EA’s Standard Rules SR2012 No13 on the treatment of IBA stated: hydrogen gas is released from the IBA during the ageing process as aluminium reacts with calcium hydroxide and water to form aluminium hydroxide. 9 The Environmental Services Association is a trade association for the UK’s waste management industry. 10 Assessment of hazard classification of UK IBA – Report for the January-June 2011 IBA dataset.
22 SR2012 No13 also stated that if the ash was stored in a building or under cover, adequate ventilation should be provided to safely disperse any gas generated. Furthermore, it stated that where there was the likelihood of a flammable or explosive atmosphere being formed, such areas should be assessed in accordance with the Dangerous Substances and Explosive Atmosphere Regulations (2002). 1.11.4 Material safety data sheet for U-IBA The purpose of an MSDS is to provide information regarding the safe handling and use of a material. They provided useful information to ships’ crews regarding the risks associated with contact with a cargo and, as such, should be carried on board. However, MSDS are not required by the IMSBC Code as they had no place in assessing the suitability of a cargo for safe carriage. The MSDS for U-IBA (Annex D) was supplied by Rock Solid BV to H&V in October
- Another MSDS for processed incinerator bottom ash aggregate was also
supplied in 2016 to H&V by Rock Solid BV, and this was erroneously included in the voyage charter party for the carriage of U-IBA by Nortrader. On the fifth page of both of these 6-page documents, the MSDS stated under the heading ‘Hazardous decomposing compounds’: When in contact with water (H2O) possible formation of hydrogen gas (H2-gas). The MSDS for U-IBA further stated: Under reducing circumstanced ammonia can be formed (NH3). Accidentally fosfine (PH3) can escape [sic] The MSDS also stated that the EWC waste catalogue classified U-IBA as non-hazardous. The spaces in the MSDS labelled ‘Identification of the producer’ and ‘Telephone number in case of Emergency’ were left blank. 1.12 TESTS 1.12.1 United Nations Manual of Tests and Criteria The United Nations publication Recommendations on the transport of dangerous goods, Manual of tests and criteria, commonly known as the UN Manual of Tests and Criteria, contained guidance for competent authorities to identify and classify goods as dangerous for transportation. This publication did not apply directly to bulk transport of dangerous goods in bulk carriers but the IMSBC Code refers to the UN Manual of Tests and Criteria, part III, for the classification of such cargoes. The competent authority had the discretion to vary the tests or require additional tests if they judged deviation from the prescribed tests to be necessary. UN Test N.5, Test method for substances which in contact with water emit flammable gases, described in section 33.4.1.4 (Annex E) of the UN Manual of Tests and Criteria, was designed to determine if a substance should be categorised as dangerous with respect to its ability to generate flammable gases when in contact with water. The test involved grinding the substance to a homogeneous mixture and measuring the gases released when small quantities (heaps of diameter 2mm and 20 mm) were mixed with distilled water. These results were then extrapolated to provide an estimate of gas released in litres per kg per hour (l/kg/hr). If this exceeded 1 l/kg/hour, the substance was classified as dangerous.
23 Due to the heterogeneous nature of U-IBA and the presence of large metallic objects, it was very difficult to ensure that samples created for testing were similar in composition to the bulk U-IBA from which they were taken. Despite following a detailed sampling protocol11 developed by the ESA, this investigation has identified significant variability across samples. 1.12.2 Gas generation potential and homogeneity of U-IBA Following the accident, on 17 January, MAIB inspectors collected 4 samples, 20kg to 25kg each, from the discharged cargo. These samples were placed in sealed containers and stored at MVVD. The MAIB commissioned WRc (an environmental consultancy, recognised as experts in waste characterisation and classification) to organise the testing of these samples and interpret the results. WRc was tasked with answering two questions:
- Was the U-IBA loaded on Nortrader similar in physical and chemical
characteristics to that produced by other incinerator plants in the UK and the MVVD plant from the time of its commissioning?
- What gases are released from the U-IBA samples of Nortrader and how much
of each gas was the sample capable of releasing? On 8 February WRc collected the sealed samples taken by the MAIB from MVVD along with a fresh sample from the MVVD incineration plant. Two methods were used to test these samples for the release of flammable gases:
- UN Manual of Tests and Criteria, Test N.5;
- An in-house test developed by the EA’s National Laboratory Services (NLS).
The main difference between these two test methods was the quantity of water added to the samples. For the UN Test N.5, the liquid-to-solid ratio was 1.5:1 and for the NLS test it was 6:1. The sample preparation method employed by WRc was to separate the ferrous and non-ferrous metal items, grind the remaining sample to less than 4mm particle size, subsample and grind again to less than 250 microns. For flammability tests, the separated metal was then ground to less than 1mm particle size and returned to the sub-samples proportionately. The reported results can be summarised as follows: ● ●UN Test N.5: No gas was produced by the three sub-samples taken from the MAIB sample. One of the three sub-samples from the WRc sample produced hydrogen at the rate of 0.43 l/kg/hour, stopping after 6 hours. ● ●NLS in-house flammability test: All three sub-samples of the MAIB sample produced hydrogen at an average rate of 0.41 l/kg/hour and all three sub- samples of the WRc sample produced hydrogen at an average rate of 0.77 l/ kg/hour. 11 Four crane grab samples are taken from the ash pit. Five samples of 10kg each are taken from each grab producing a sub-sample of 200kg of ash. This sample is then mixed, coned and quartered (a method to reduce systemic bias). Two opposite quarters are then selected for tests.
24 The MAIB samples were also tested to quantify metals, and several other parameters including alkalinity and moisture content. The report stated that, assuming all the non-ferrous metal in the U-IBA sample provided by MAIB was metallic aluminium, the total theoretical hydrogen production potential was 31 l/kg. The WRc report concluded as follows: ● ●In general the U-IBA collected from the ship on the 17th of January 2017 exhibited similar chemical characteristics to UK wide U-IBA samples analysed by WRc. ● ●The concentration of major elements and metals with the potential to form flammable gases were within the expected range for UK U-IBA from municipal waste facilities based on WRc’s in-house data set. ● ●Neither the MVVD U-IBA sample collected from the ship post the explosion, or the sample of fresh U-IBA collected directly from the Devonport facility were hazardous by HP3-A (Highly flammable – water reactive waste). ● ●Although neither U-IBA samples tested were hazardous by HP3; when exposed to water a low rate of H2 generation was observed during both the UN test N.5 and the in-house NLS test method (0.43 and 0.77 l kg-1 h-1 respectively). Considering the rate of H2 production, scenario specific risk assessments should be conducted regarding U-IBA transport and storage where confined conditions are used. There could be a potential risk of explosive atmosphere formation in certain conditions when the quantity of U-IBA is large relative to the effective air space. 1.12.3 MVV Environment Devonport tests Every month, in accordance with EA requirements, MVVD had two samples of U-IBA tested using the ESA protocol. Figure 12 shows a comparison between the results of these tests and WRC’s in-house data made up of the test results from over 21 similar incinerator facilities in the UK. A comparison between the test results of the routine test carried out by MVVD and the sample collected by the MAIB after the accident is shown in Table 1. The total metal content in the MAIB sample was estimated as 10.6%, of which the non-ferrous content was 2.6%. Parameter Routine test carried out by MVV after production Test carried out post- accident by a different lab Aluminium12 [mg/kg] 19,248 26,246 Moisture [% weight] 14.5 12.4 pH value or measure of alkalinity 12.6 11.8 Table 1: Comparison of test results of U-IBA loaded on Nortrader 12 The aluminium content reported in these tests is that found in the clinker and does not contribute towards the production of hydrogen.
25 Figure 12: Comparison of U-IBA sample from Nortrader with national averages (extracted from the WRc report) Key ANC: Acid neutralising capacity TC: Total carbon TOC: Total organic carbon LOI: Loss on ignition
26 Following the accident, at the request of Rock Solid BV, MVVD sent 10 samples of U-IBA to be tested for the release of flammable gases. These tests, carried out in accordance with UN test N.5, showed negligible gas release for all 10 samples. Marchwood Scientific Services’ report is included at Annex F. 1.13 BURGOYNES & PARTNERS INVESTIGATION Burgoynes & Partners were appointed by Nortrader’s hull and machinery insurers to complete an independent investigation of the explosion. Their report stated that the explosion was most likely to have been the result of hydrogen released from the cargo. Burgoynes tested for gas within small holes dug into a heap of U-IBA after it had been discharged ashore from Nortrader and measured 1.4% hydrogen and 0.2% carbon monoxide. The test was repeated the next day, but neither gas was registered on the gas meter. 1.14 ESTIMATION OF POTENTIAL HYDROGEN PRODUCTION 1.14.1 Production of hydrogen Hydrogen is a colourless, odourless gas that is 14 times lighter than air. It is highly volatile and burns easily in air at concentrations between 4% and 75%. Compared to other flammable gases, hydrogen has the lowest minimum ignition energy, which is a measure of the electrical energy contained in a spark across two conductors sufficient to cause ignition of the flammable mixture13. The predominant source of hydrogen generation in U-IBA is the reaction of elemental aluminium with water in alkaline conditions. Other metals such as iron, nickel and copper can also produce hydrogen, but their contribution is negligible when compared to aluminium. 1.14.2 Study to estimate hydrogen volume The MAIB commissioned the Hydrogen Hazards Unit (HHU) of London South Bank University to carry out a study to determine the approximate concentration of hydrogen gas required to generate the explosive forces experienced on board Nortrader. The MAIB provided HHU with relevant information, including the drawings and dimensions of the cargo hold and forecastle store, weights and material of hatch covers, breaking strengths of cleats and wedges used to secure the hatch covers, and photographs of the damage. The results of the tests carried out by WRc, and other U-IBA test results made available to the MAIB, were not supplied to HHU. The HHU report (Annex G) stated that the flame generated during the first explosion would have propagated into the cargo hold and that the pressure in the hold would have risen as the hydrogen air mixture within it combusted. It was estimated that after approximately 0.15 second, the hatch covers would have lifted, allowing the pressure built up in the hold to vent to atmosphere. The temperature of the hydrogen flame front was estimated to have been approximately 1000°C. 13 LECTURE. Sources of hydrogen ignition and prevention measures (Compiled by S.Tretsiakova-McNally; reviewed by D.Makarov).
27 The report concluded: In summary, considering the evidence available, the likely concentration in the cargo hold at the time of the explosion was in the rage of 6 to 9% (v/v). This equates to a volume of between 114 and 171 m3 [of hydrogen gas]. 1.15 PREVIOUS/SIMILAR ACCIDENTS 1.15.1 Accidents at sea In January 2008, two crew members died of asphyxiation in the forward store room of the dry cargo vessel Sava Lake (MAIB report 15/2008). The oxygen level had been depleted by the cargo of steel turnings, a cargo the vessel was not authorised to carry. The atmosphere in the cargo hold was inadvertently equalised with that of the forward store due to modifications carried out on the ventilation trunking. 1.15.2 Accidents ashore In 2006, following an explosion in a disused oil well that was used to store U-IBA, the Swedish Thermal Engineer Research Institute carried out a study to estimate the hydrogen generation potential of U-IBA.14 In 2009, the Health and Safety Executive in the UK reported severe injuries to a worker who was using an angle grinder to cut steel reinforcement in a concrete structure which utilised U-IBA. Several other incidents of cracks developing in concrete and overlay asphalt on roads, due to the production of hydrogen by the U-IBA used, have also been reported by organisations, including the UK’s Health and Safety Executive. 14 Maria Arm and Johanna Lindeberg, 2006: Gas generation in incinerator ash.
28 SECTION 2 - ANALYSIS 2.1 AIM The purpose of the analysis is to determine the contributory causes and circumstances of the accident as a basis for making recommendations to prevent similar accidents occurring in the future. 2.2 THE EXPLOSION 2.2.1 Conditions for the explosion Laboratory tests have established that hydrogen gas was the only flammable gas released by the U-IBA carried on board Nortrader and that a sufficient quantity of hydrogen could have been released from the cargo to form an explosive atmosphere. Several underlying conditions combined to cause the explosion: ● ●The presence of 2.6% non-ferrous metals including aluminium, the alkalinity of the cargo, and an increased moisture content due to heavy rain during loading led to the generation of hydrogen. ● ●The 19 hours spent at anchor allowed the generated hydrogen to accumulate in the unventilated cargo hold. ● ●The unsecured and unsealed cargo hold lamp access cover in the forecastle store allowed hydrogen gas to enter the forecastle store. ● ●The closed vents and access door of the forecastle store allowed the hydrogen to accumulate in the forecastle store. ● ●The broken lug of the emergency fire pump starter panel door allowed the accumulated hydrogen to enter the space in the circuit breaker. 2.2.2 Connection between cargo hold and forecastle store The access plate for the starboard cargo hold lamp fitting had been left loosely secured by two bolts with no gasket. It is likely that the bulb in this fitting was prone to regular failure, due to the vibration generated in the area during the bow thruster operation, resulting in a need for frequent access. However, leaving the access plate slack and unsealed effectively connected the cargo hold with the forecastle store, allowing the atmosphere of both spaces to equalise. Had Nortrader been certified to carry dangerous goods, the access to the cargo lamps might have been better designed and more strictly controlled. As on Sava Lake (see 1.15.1), the gas tight integrity of the cargo hold of Nortrader was breached. On Nortrader, this allowed the lighter than air hydrogen generated by the cargo to rise and enter the forecastle store. Hydrogen being an odourless, colourless gas, the chief engineer would not have been alerted to its presence when he entered the space.
29 2.2.3 Ignition leading to explosions The propensity of hydrogen to form an explosive mixture with air across a broad range of concentrations, and the ability of a weak ignition source to ignite this mixture, resulted in the first explosion. The ignition source for the hydrogen air mixture was most likely to have been electrical arcing between the contactors in the switch gear in the emergency fire pump starter panel when the chief engineer stopped the pump. The initial explosion in the forecastle store would have led to a rapid increase in pressure in the store. This pressure was responsible for throwing the chief engineer against the starter panels before it was released through the open weathertight door. The flame front from the initial explosion propagated through the unsealed cargo lamp access cover and ignited the hydrogen air mixture in the hold. The pressure created in the hold by the resulting explosion was sufficient to break all the hatch cleats and dislodge the hatch covers. There were no subsequent explosions since the hold was then open to atmosphere, stopping any further accumulation of hydrogen. HHU estimated the flame front temperature to have been 1000°C. However, the passage of the flame front would have been very quick as the accumulated hydrogen burned. The chief engineer appeared to have suffered the full brunt of the first explosion, causing the synthetic fibre-filled coat he was wearing to melt onto his body. 2.3 DECISION TO LOAD 2.3.1 Precedent There had been 34 shipments of U-IBA from Plymouth to Beverwijk since the incinerator plant started operating in 2015. However, U-IBA was not listed in the IMSBC Code and no steps had been taken to seek approval from the competent authorities for its carriage, as required by the Code. Had the explosion on Nortrader not taken place, these unauthorised and dangerous shipments would probably have continued without change. 2.3.2 Master The master had the ultimate responsibility for accepting the cargo and could have challenged the instructions he received from H&V on the basis that the cargo was not listed in the IMSBC Code. However, Nortrader’s SMS incorrectly stated that the IMSBC Code was only to be used when carrying dangerous cargoes. This was the way that the IMSCB Code’s predecessor, the BC Code, had been used. The charter party stated that U-IBA was non dangerous and non-IMO classed (implying that it was not a recognised dangerous cargo under the IMDG Code). Therefore, it is not surprising that the master, along with the masters of the vessels carrying the previous 34 shipments, followed the loading instructions from H&V.
30 2.3.3 Shipper All cargoes of U-IBA from MVVD had been arranged by Rock Solid BV through H&V. Since U-IBA was not listed in the IMSBC Code, Rock Solid BV (the shipper of the cargo) should have provided the MCA (the competent authority at the port of loading) with the required information regarding the intended cargo, prior to the first carriage of this cargo in June 2015. However, Rock Solid BV was unaware of this requirement as it had no shipping expertise, and expected H&V to provide marine advice as required, despite there being no written agreement between them to this effect. H&V restricted its action to identifying and chartering ‘suitable’ vessels, without referring to the IMSBC Code. Its selection was based on the limited information contained in the MSDS for U-IBA provided by Rock Solid BV in October 2013 (Annex D). While this was inappropriate use of the MSDS, it did state that U-IBA could release hydrogen and other dangerous gases when in contact with water. In contrast, the charter party for Nortrader inaccurately stated that U-IBA was non dangerous. The charter party also stated that U-IBA was non-IMO classed although it would have been more accurate to state that U-IBA had not been given a BCSN since it had never been assessed, as required by the IMSBC Code. 2.3.4 UK regulations The UK Carriage of Cargoes Regulations had not been updated, and referred to the guidance provided by the superseded BC Code and not the mandatory IMSBC Code. However, this factor did not influence the skipper’s decision to load U-IBA or contribute in any way to the accident on Nortrader. Furthermore, it is considered unlikely that past shipments were carried out with the intent of exploiting any potential loophole in the UK regulations. 2.4 UNIQUENESS OF CARGO OR VESSEL 2.4.1 Cargo There had been 34 shipments of U-IBA from MVVD since June 2015, without any untoward incidents. Yet the cargo loaded on Nortrader caused a major explosion. The human consequences of this accident could have been severe, and it is extremely fortunate that the chief engineer survived the explosion. The cargo loaded on Nortrader comprised U-IBA produced at MVVD over a period of 15 consecutive days. The tests carried out by WRc on samples collected after the explosion established that the chemical and physical characteristics of the cargo were consistent with those of the U-IBA from other facilities in the UK. 2.4.2 Vessel More than a third of the vessels employed to carry the previous shipments were certified to carry dangerous cargoes. Breaches between cargo hold and adjoining spaces were therefore less likely to have existed and electrical equipment, where fitted in the cargo space, would have been intrinsically safe, thus reducing the potential for ignition sources. It is also possible that some vessels operated natural
31 or forced exhaust ventilation systems for the cargo holds while carrying U-IBA, thus protecting themselves by avoiding the potential for the accumulation of hydrogen. However, Nortrader’s design and construction, including that of its cargo hold and ventilation systems, were similar to many of the other vessels that had been engaged to carry U-IBA from MVVD. 2.4.3 Conclusion Neither the U-IBA cargo loaded onto Nortrader nor the vessel itself were unique in any way that might have contributed to this accident. 2.5 CLASSIFICATION OF U-IBA 2.5.1 Carriage of U-IBA by sea U-IBA had not been assessed or classified for carriage in bulk by sea. The only approved means of ensuring safe carriage of solid bulk cargoes is through the application of the IMSBC Code. The schedules included in Appendix 1 of the Code clearly classify cargoes and identify the necessary requirements for safe carriage. Where no schedule is listed for a specific cargo, the required classification procedure is stated at Section 4 of the Code with further guidance provided by MSC Circ.1453, MGN 512 and the guidance document Carrying solid bulk cargoes safely (Annex C). It is likely that this accident would not have happened had the IMSBC Code requirements been followed, as the dangers would have been identified and procedures for safe carriage developed and implemented prior to loading. 2.5.2 Classification of U-IBA ashore The UK’s LoW regulation, revoked in July 2015, categorised U-IBA as mirror hazardous. Monthly testing was voluntarily undertaken by the majority of incinerator facilities in the UK, based on a protocol developed by the ESA and endorsed by the EA. This protocol represented a significant step forward in the understanding of the classification and properties of IBA and was a good example of an industry led protocol. However, the protocol discounted the potential for the generation of flammable gases on the erroneous assumption that the incineration process would have rendered the U-IBA non-flammable, without considering the possibility of the ash releasing flammable gases when wet. Ashore, the release of hydrogen gas from moist U-IBA was a recognised phenomenon. The EA’s SR2012 No13 identified that wet U-IBA would release hydrogen and stated that ventilation was required to disperse the hydrogen where U-IBA was stored under cover. In view of this, the EA’s endorsement of the ESA test protocol that did not include HP3 was inappropriate. 2.6 ADEQUACY OF UNITED NATIONS TEST N.5 2.6.1 Non-replicability of test results Flammable gas release tests conducted by Marchwood Scientific Services on 10 fresh samples, and on samples collected by the MAIB after the accident, did not produce any hydrogen when subject to UN Test N.5. However, the fresh sample
32 collected by WRc from MVVD tested positive for hydrogen release. The NLS in-house method test of the MAIB sample proved positive, although a smaller quantity of hydrogen was released compared to the fresh WRc sample during this test. Sample preparation, inter-lab variability, the variability in the two test methodologies, and the aging of the sample may account for some of the difference in results. The UN Test N.5, like the NLS in-house method test, assumed that the sub samples used for testing were representative of the cargo. However, visual observation of U-IBA and its test results demonstrate that it was highly heterogeneous in nature and, despite the best efforts to reconstitute the test samples as per their original composition, it is difficult if not impossible to achieve reliable and repeatable results. 2.6.2 Rate of release of flammable gas It is evident that the release of hydrogen was localised and perhaps limited to pockets. If the results of the UN Test N.5 on the WRc sample are extrapolated, the total hydrogen produced in 6 hours (the duration after which the gas production was observed to have ceased) would amount to 6019m3. The strength of explosion of such a quantity of hydrogen would have resulted in far worse damage to the vessel. The estimation by HHU of London South Bank University, that the quantity of hydrogen present in the hold was unlikely to have exceeded 171m3, was considered to be more realistic. At the time of the explosion, the hold had been sealed for approximately 19 hours. It cannot be known whether the cargo was still producing hydrogen, but subsequent testing showed that some was still being produced in one sample. The production of 171m3 of hydrogen from 2333t of cargo equates to a minimum theoretical rate of release of approximately 0.004l/kg/h. While this is a rough approximation, it is clear that the 1l/kg/h threshold for categorising a cargo as hazardous (UN Test N.5) is inappropriate for bulk cargoes, and that the competent authorities’ discretion to require additional tests should be exercised. For purposes of transportation in bulk by sea, the release of any quantity of flammable gas should be considered dangerous. The MCA has recognised this and has categorised U-IBA as a cargo posing a chemical hazard that could give rise to a dangerous situation on a ship.
33 SECTION 3 - CONCLUSIONS 3.1 SAFETY ISSUES DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS
Hydrogen gas was the only flammable gas released by the U-IBA carried on board Nortrader, and a sufficient quantity of hydrogen could have been released from the cargo to form an explosive atmosphere. [2.2.1]
The gas tight integrity of the cargo hold was breached, allowing the hydrogen generated by the cargo to enter the forecastle store. [2.2.2]
The ignition source for the hydrogen air mixture was most likely to have been electrical arcing between the contactors in the switch gear in the emergency fire pump starter panel. [2.2.3]
There had been 34 shipments of U-IBA from Plymouth to Beverwijk despite U-IBA not being listed in the IMSBC Code, during which no steps had been taken to seek approval from the competent authorities for its carriage. [2.3.1]
Nortrader’s SMS incorrectly stated that the IMSBC Code was only to be used when carrying dangerous cargoes. [2.3.2]
The shipper, Rock Solid BV, was unaware of the requirements of the IMSBC Code. [2.3.3]
Hudig & Veder restricted its action to identifying and chartering ‘suitable’ vessels, without referring to the IMSBC Code. [2.3.3]
Had the IMSBC Code requirements been followed it is likely this accident would not have happened as the dangers would have been identified and procedures for safe carriage developed and implemented prior to loading. [2.5.1]
For purposes of transportation in bulk by sea, the release of any quantity of flammable gas should be considered dangerous. [2.6.2] 3.2 SAFETY ISSUES NOT DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS
The UK Carriage of Cargoes Regulations had not been updated and referred to the guidance provided by the superseded BC Code and not the mandatory IMSBC Code. [2.3.4]
The test protocol adopted by the ESA and endorsed by the EA erroneously discounted the potential for the generation of flammable gases. [2.5.2]
The Environment Agency’s endorsement of the ESA test protocol that did not include HP3 was inappropriate. [2.5.2]
Due to its heterogeneous nature, it is difficult if not impossible to achieve reliable and repeatable results using UN Test N.5 on U-IBA. [2.6.1]
The 1l/kg/h limit suggested by (UN Test N.5) is inappropriate for bulk cargoes. [2.6.2]
34 SECTION 4 - ACTION TAKEN 4.1 MAIB ACTIONS The Marine Accident Investigation Branch has: ● ●Published a safety flyer intended to promulgate the lessons learned from this accident with particular emphasis on the application of the IMSBC Code. ● ●Worked with several trade bodies including the International Group of Protection & Indemnity Clubs, International Chamber of Shipping, International Association of Dry Cargo Ship Owners, and Institute of Chartered Shipbrokers to help disseminate the safety flyer. ● ●Provided the MCA with the results of laboratory tests and technical research conducted during this investigation to support its submissions to the IMO. 4.2 ACTIONS TAKEN BY OTHER ORGANISATIONS The Maritime and Coastguard Agency has: ● ●Set up a tripartite agreement between the UK, the Netherlands and several other Administrations for the safe carriage of U-IBA. ● ●Proposed two papers to the International Maritime Organization: to include U-IBA in the schedule of authorised cargoes in the IMSBC Code; and to raise the issue of the inadequacy of UN test N.5 for non-homogeneous bulk cargoes. MVV Environment Devonport Limited has: ● ●Installed hydrogen gas monitors and a hydrogen warning system in the U-IBA storage bunker. ● ●Revised the risk assessment and procedures for U-IBA storage and movement from the site. The Environment Services Association has: ● ●Published a notice on its website about incinerator bottom ash, which includes the hazard of hydrogen release. ● ●Commissioned further tests on un-ground U-IBA samples for the generation of hydrogen gas.
35 SECTION 5 - RECOMMENDATIONS The Maritime and Coastguard Agency and the Environment Agency are recommended to: 2017/153 Work collaboratively to identify reliable methods and protocols for testing non-homogeneous solid bulk cargoes for the property of evolving flammable gases when wet. The Maritime and Coastguard Agency is recommended to: 2017/154 Update The Merchant Shipping (Carriage of Cargoes) Regulations 1999 with appropriate references to the IMSBC Code. Hudig & Veder BV is recommended to: 2017/155 Review its operating procedures to ensure that the requirement to apply the provisions of the IMSBC Code to all bulk cargoes is clear. NTO Shipping GmbH & Co.KG is recommended to: 2017/156 Review its safety management system to ensure that the requirement to apply the provisions of the IMSBC Code to all bulk cargoes is clear. Safety recommendations shall in no case create a presumption of blame or liability
Marine Accident Report
FD06050 | 2017_英国_man-overboard-from-ocean-rowing-boat-toby-wallace-with-loss-of-1-life__MAIBInvReport2_2017.pdf
分类:06_境外及港澳台调查报告 | 年份:2017 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
M A R I N E A C C I D E N T I N V E S T I G AT I O N B R A N C H ACCIDENT REPORT VERY SERIOUS MARINE CASUALTY REPORT NO 2/2017 FEBRUARY 2017 Report on the investigation of the fatal man overboard from the ocean rowing boat Toby Wallace North Atlantic Ocean 14 February 2016
Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2017 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. All MAIB publications can be found on our website: www.gov.uk/maib For all enquiries: Marine Accident Investigation Branch Spring Place 105 Commercial Road Southampton Email: maib@dft.gsi.gov.uk United Kingdom Telephone: +44 (0) 23 8039 5500 SO15 1GH Fax: +44 (0) 23 8023 2459 Press enquiries during office hours: 01932 440015 Press enquiries out of hours: 020 7944 4292
CONTENTS GLOSSARY OF ABBREVIATIONS AND ACRONYMS SYNOPSIS 1 SECTION 1 - FACTUAL INFORMATION 2 1.1 Particulars of Toby Wallace and accident 2 1.2 Narrative 3 1.2.1 Events leading to the man overboard 3 1.2.2 Crew actions 3 1.3 Hindcast 8 1.4 Crew 8 1.4.1 Skipper 8 1.4.2 First mate 9 1.4.3 Pay per place crew 9 1.4.4 Preparation 9 1.4.5 Watch routine 10 1.4.6 Previous man overboard 10 1.5 Boat design and construction 10 1.6 Onboard equipment 11 1.6.1 General 11 1.6.2 Lifejackets, tethers and personal locator beacons 11 1.6.3 Ankle leashes 11 1.7 Oceanus Rowing Ltd 11 1.8 Ocean rowing 12 1.9 Atlantic Challenge race rules 12 1.10 Local requirements 13 1.11 Pleasure vessel regulations 13 1.11.1 Definition 13 1.11.2 Applicable regulations 14 1.12 Governing body 14 1.13 Previous accidents 15 1.13.1 General 15 1.13.2 Fire Ant 15 SECTION 2 - ANALYSIS 16 2.1 Aim 16 2.2 Loss overboard 16 2.3 Boat design 16 2.4 Carriage and use of safety equipment 17 2.4.1 Requirements 17 2.4.2 Ankle leash 17 2.4.3 Lifejackets and tethers 17 2.4.4 Personal locator beacon 18 2.4.5 Man overboard 18 2.5 Preparation and training 19 2.6 Emergency response 19 2.7 Governance 19 2.7.1 Commercial operation 19 2.7.2 Best practice 20
SECTION 3 - CONCLUSIONS 22 3.1 Safety issues directly contributing to the accident that have been addressed or resulted in recommendations 22 3.2 Other safety issues not directly contributing to the accident 22 SECTION 4 - ACTIONS TAKEN 23 4.1 Actions taken by other organisations 23 SECTION 5 - RECOMMENDATIONS 24
FIGURES Figure 1
Toby Wallace – position on 14 February 2016 Figure 2
Rowing positions Figure 3
Ankle leash and foot straps Figure 4
Toby Wallace before abandonment Figure 5
Toby Wallace’s crew climbing on board Sea Pearl Figure 6
Toby Wallace – abandoned and drifting
Figure 7
An ocean rowing boat fitted with guardrails
Figure 8
An ocean rowing boat fitted with guard wires Figure 9
Use of a safety harness, tethers and jackstay
GLOSSARY OF ABBREVIATIONS AND ACRONYMS
AIS
Automatic Identification System EPIRB
Emergency Position-Indicating Radio Beacon GPS
Global Positioning System kt
knot m
metre MGN
Marine Guidance Note MHz
megahertz mm
millimetre MRCC
Maritime Rescue Co-ordination Centre nm
nautical mile PLB
Personal Locator Beacon RYA
Royal Yachting Association SAR
Search and Rescue UTC
Universal Time Co-ordinated VHF
Very High Frequency TIMES: all times used in this report are UTC (-1) unless otherwise stated
1 SYNOPSIS On 14 February 2016, the 10.8m ocean rowing boat Toby Wallace was on passage in the North Atlantic Ocean, between the Canary Islands and Barbados. Shortly after 2300, a rower was swept overboard by a large wave and he soon became separated from the boat. The seven rowers remaining on board were unable to stop the boat, and they eventually lost sight of him. The following day, French and Portuguese fixed wing aircraft and the Bahamas registered cargo ship Sea Pearl searched the area, but the missing rower was not found. Toby Wallace’s crew were recovered on board Sea Pearl, leaving the abandoned rowing boat to drift. Sea Pearl arrived in Macapa, Brazil, 6 days later. The investigation identified that: ● ●The rower had not been adequately tethered to the boat. ● ●The boat’s low gunnels1 afforded little protection against a person falling overboard. ● ●The rower became separated from the boat because the leash he was wearing detached from his ankle and the boat could not be stopped in the prevailing conditions. ● ●The rower’s likelihood of being found was reduced because he was not wearing a lifejacket or a personal locator beacon. ● ●The boat was operating on a commercial basis but it was not certified as a commercial vessel. This was the second occasion in 2 days in which rowers in an ocean rowing boat operated by Oceanus Rowing Ltd had been rescued in the North Atlantic Ocean by a passing merchant vessel. Earlier on 14 February 2016, the four crew of the ocean rowing boat Fire Ant were rescued by the Liberia registered bulk carrier Rio Grita after the boat was damaged in rough seas. Ocean rowing is a niche sport that has grown in popularity, but the boats used and their operation, is largely unregulated. They are also vulnerable when on ocean passage, where assistance is rarely immediately at hand. Although elements of best practice for the sport have been established over the years, these have not yet been formalised or applied consistently. Recommendations have been made to British Rowing, the governing body for ocean rowing in England, and to the Maritime and Coastguard Agency that are intended to improve the governance of UK registered ocean rowing boats and ensure minimum safety standards on board those that are commercially operated. A recommendation made to Oceanus Rowing Ltd is aimed at improving the safety of its boats on ocean crossings in the future. 1 Gunnel/gunwale; upper edge of the boat’s sides.
2 SECTION 1 - FACTUAL INFORMATION 1.1 PARTICULARS OF TOBY WALLACE AND ACCIDENT SHIP PARTICULARS Vessel’s name Toby Wallace Flag United Kingdom Classification society Not applicable IMO number/fishing numbers Not applicable Type Ocean Rowing Boat Registered owner Privately owned Manager(s) Oceanus Rowing Ltd Construction Carbon fibre – epoxy resin Year of build 2011 Length overall 10.8m Registered length Not applicable Gross tonnage Not applicable Minimum safe manning Not applicable Authorised cargo Not applicable VOYAGE PARTICULARS Port of departure Puerto De Mogan, Gran Canaria Port of arrival Barbados Type of voyage International Cargo information Not applicable Manning 8 MARINE CASUALTY INFORMATION Date and time 14 February 2016 at 2301 UTC (-1) Type of marine casualty or incident Very Serious Marine Casualty Location of incident 18° 28.89N 38° 59.19W Place on board Open rowing deck Injuries/fatalities 1 fatality Damage/environmental impact None Ship operation On passage Voyage segment Mid water External & internal environment Wind east-north-east at Beaufort Force 6; sea state 5 (3m significant wave height); sea temperature 22°C; weather rain Persons on board 8
3 1.2 NARRATIVE 1.2.1 Events leading to the man overboard On 28 January 2016, the 10.8m ocean rowing boat Toby Wallace departed from Puerto De Mogan, Gran Canaria for passage to Barbados, West Indies (Figure 1). On board were eight rowers who aimed to complete the voyage in less than 31 days. Toby Wallace’s crew were divided equally into two watches. The skipper was in charge of one watch and the first mate was in charge of the other. The rowers in each watch were allocated one of four rowing positions (Figure 2). The stroke2 sat furthest aft (position 1). When on watch, the skipper sat immediately behind the stroke (position 2) and the mate sat in the bow seat (position 4). By 14 February, Toby Wallace had made good progress in steady force 4-5 east-north-east trade winds. The boat was making good between 3kts and 4.5kts and was approximately half-way across the North Atlantic Ocean, 1500nm from land. At 2300, Toby Wallace was heading downwind and down sea and was making good a course of 253° at 3.9kts3.The ‘on-watch’ crew were seated with their feet secured to footplates with straps. Each of the rowers had a leash attached around their right ankle (Figure 3), the other end of which was secured to a jackstay4 that ran along the port side of the deck. As the bow oarsman (position 4) took a planned 3 minute break from rowing, the skipper saw a large wave approaching off the port quarter and shouted “big wave”5 to warn the crew. The wave broke over Toby Wallace and swept all of the rowers, apart from the skipper, off their seats. The ‘stroke’, Mike Johnson, landed on the starboard side of the deck from where he then rolled over the boat’s starboard gunnel into the sea. Mike’s ankle leash detached and he was quickly separated from Toby Wallace as the rowing boat continued to move ahead through the water. The ankle leash was recovered inboard. Mike was wearing oilskins, training shoes and a head torch fitted with a red lamp. 1.2.2 Crew actions The skipper immediately shouted “man overboard” and attempted to steer Toby Wallace to port in order to position the boat across the wind and sea. He also told the rowers to ‘hold water’6. Meanwhile, the off-watch crew in the aft cabin input a man overboard mark in the global positioning system (GPS) plotter and broadcast a “Mayday”7 via very high frequency (VHF) radio. 2 The stroke rower sets the stroke rate and rhythm for the rest of the crew to follow. 3 Toby Wallace’s position and course, and speed over the ground were periodically transmitted via satellite. 4 In this context ‘Jackstay’ means a strong line, usually of flat webbing or a wire stay running fore and aft along the sides or a deck of a boat to which a safety harness can be attached. 5 ‘Big wave’ was the recognised verbal warning on board to alert the crew that the boat was about to be swamped. 6 ‘Hold water’ – a command to stop a rowing boat by squaring the oar blades in the water. 7 “Mayday” – the international distress message (spoken).
4 Reproduced from Admiralty Chart BA 4015-0-1 by permission of the Controller of HMSO and the UK Hydrographic Office Figure 1: Toby Wallace – position on 14 February Toby Wallace 2300 on 14 February 2016 Fire Ant 0800 on 13 February 2016 Cape Verde Ponta Delgada Dakar Puerto de Mogan
5 Figure 2: Rowing positions 3 4 Forward cabin Aft cabin Figure 3: Ankle leash and foot straps Ankle leash Jackstay Foot strap Ankle strap Watch leader 2 Stroke 1
6 Toby Wallace was turned across the sea but the crew were unable to row the boat into the wind and they could see that the distance to the red light from Mike’s head torch was increasing. To try and stop the boat, a drogue8 and a parachute anchor9 were deployed over the port and starboard sides respectively. The parachute anchor soon became detached, so the crew attached various items including the liferaft valise and lifejackets to a line and threw them over the side. Water ballast was also added to some compartments to make the boat heavier. At approximately 2322, the skipper activated the emergency position-indicating radio beacon (EPIRB)10. The EPIRB’s distress signal was received by the Maritime Rescue Co-ordination Centre (MRCC) Falmouth, UK, which confirmed the boat’s location with the duty officer at Oceanus Rowing Ltd, Toby Wallace’s operator. The duty officer also provided MRCC Falmouth with the boat skipper’s satellite telephone contact details. At 0002 the following day, MRCC Falmouth contacted Toby Wallace’s skipper via satellite telephone. He advised that the wind was 35kts and that he could not manoeuvre Toby Wallace towards the man overboard. He also advised that the boat’s AIS receiver was showing no other vessels in the area. Toby Wallace’s crew last saw the red light from Mike’s head torch at about 0022. The boat’s crew released rocket flares at regular intervals and tied a light on the end of an upright oar to act as a beacon. By 0130, the crew were in a state of shock. Waves continued to break over Toby Wallace’s deck and two of the rowers started to suffer from hypothermia. At 0300, Toby Wallace was still drifting at a speed of 1.6kts to the west. Eventually, all seven remaining crew took shelter in the forward and aft cabins. As Toby Wallace was in the Portuguese search and rescue (SAR) region, MRCC Falmouth passed responsibility for co-ordination of the incident response to MRCC Ponta Delgada, Azores (Figure 1). MRCC Ponta Delgada arranged for a French Falcon aircraft from Dakar, Senegal, and a Portuguese P3C Orion aircraft from Portugal to search for the missing rower. The Bahamas registered cargo ship Sea Pearl, which was about 113nm to the east of Toby Wallace, was also diverted. The Falcon aircraft departed from Dakar at 0550 and, having refuelled in Cape Verde, it was on scene between 1100 and 1230. Sea Pearl arrived at about 1230 and the P3C Orion joined the search from about 1430 until 1530, but Mike Johnson was not found. At 2000, Toby Wallace’s crew were recovered on board Sea Pearl (Figures 4 and 5), leaving Toby Wallace to drift (Figure 6). Sea Pearl arrived in Macapa, Brazil, 6 days later. The last transmission received from Toby Wallace’s AIS was on 9 May, when the boat was approximately 500 miles north-east of the British Virgin Islands. 8 A drogue is a conical shaped bag that is towed astern in order to reduce the speed of advance. 9 A parachute anchor is typically made of woven material that is shaped like a round parachute and is intended to be deployed over the bow on a bridle arrangement in order to stop a boat head into wind. 10 EPIRBs alert search and rescue services by transmitting a coded message on the 406MHz distress frequency. Some EPIRBs also have built-in GPS that provide positional information. The EPIRB carried on board Toby Wallace was not fitted with a GPS.
7 Figure 4: Toby Wallace before abandonment Figure 5: Toby Wallace’s crew climbing on board Sea Pearl
8 1.3 HINDCAST A Met Office hindcast report for Toby Wallace’s position at the time of the man overboard concluded: All available evidence suggests that Toby Wallace was impacted by a steady east or east-northeast trade wind of force 5 or 6 during the 14th and 15th February 2016. Significant wave height was of approximately 3 metres with a zero upcrossing period of 6 or 7 seconds11. An 11 second swell of 1.0-1.5 metres was aligned with the direction of wind wave, but crossed by a southeast going swell of approximately 1.0 metres with a peak period of 15 seconds. In addition, this swell train was opposed by a weak northwest going current modelled 0.3 to 0.4 knots. These ‘crossing seas’ would have made for steeper than normal wave scenario. Maximum individual wave heights, crest to trough would have been double significant wave height within a 6-hour period; 6.6 metres on the 14th and 6.2 metres on the 15th. [sic] 1.4 CREW 1.4.1 Skipper Toby Wallace’s skipper was the boat’s registered owner. He was 43 years old and a UK national who had completed nine ocean crossings, four of which had been on board Toby Wallace. The skipper held a Royal Yachting Association (RYA) 11 MAIB note. Zero upcrossing period is a method of measuring wave periodicity. Figure 6: Toby Wallace – abandoned and drifting
9 powerboat qualification, and had completed RYA training courses in sea survival, VHF radio and Ocean Yachtmaster theory. He received a payment/salary for skippering Toby Wallace on its Atlantic crossing. Toby Wallace’s skipper had been very actively involved in ocean rowing since 1997 and Toby Wallace was the last of 64 ocean rowing boats that he had designed and built. In 2003, he established ‘Woodvale Events Ltd’ and purchased the commercial rights to operate the ‘Atlantic Rowing Race’. Between 2004 and 2011, through Woodvale Events Ltd and then Woodvale Challenge Ltd, the skipper operated six ocean rowing races, developed safety rules for ocean racing and negotiated and agreed minimum boat equipment and crew qualification requirements with the Tenerife Port Authority12. In 2007, the skipper organised the first ‘pay per place’ ocean rowing expedition. 1.4.2 First mate The first mate was an experienced ocean rower, having completed four previous Atlantic rowing events. He was 68 years old and had completed RYA training courses in sea survival, first-aid, VHF radio and Ocean Yachtmaster theory. The first mate was a late addition to the crew due to the withdrawal of the intended person for this role. He met Toby Wallace’s paying crew in Puerto De Mogan prior to the start of the row. 1.4.3 Pay per place crew The remainder of Toby Wallace’s crew comprised UK, French and Zimbabwean nationals aged between 20 and 68. One of the crew was female. None held any maritime qualifications or had completed any recognised maritime training courses but all had sporting and/adventure activity backgrounds. Each was charged £15000 towards the expenses incurred in preparing, equipping and transporting Toby Wallace from the UK to Gran Canaria and from Barbados back to the UK. One of the crew had previously had surgery for a percutaneous transluminal coronary angioplasty13 as well as having a full knee arthroplasty14. He was initially incapacitated through seasickness but was then unable to row due to problems with his knees. The deceased, Mike Johnson, was a 21 year-old Zimbabwean and UK national who had been involved in rowing since 2007 and had competed in a number of junior world rowing championships. His other sporting interests included cross-country running and cycling. 1.4.4 Preparation Between 22 and 23 August 2015, Toby Wallace’s skipper and four of the paying crew had rowed together on board the ocean rowing boat Britannia, which was similar to Toby Wallace, in Colwyn Bay, Wales. All eight members of the crew rowed together on several occasions and practised a man overboard recovery, using a bucket to represent a person in the water, in calm conditions in Puerto De Mogan before setting off for Barbados. 12 The Port Authority of Santa Cruz de Tenerife also manages the ports of Santa Cruz La Palma, Los Cristianos, San Sebastian de La Gomera and La Estaca. See also paragraph 1.10. 13 Surgical treatment to open a narrowed or blocked artery using a wire mesh tube called a “stent”. 14 Replacement of knee joint with an artificial joint.
10 1.4.5 Watch routine After departing from Gran Canaria on 28 January 2016, Toby Wallace’s crew worked a rotating watch routine with each day divided in to 11 periods of between 1 and 4 hours. Watch changes were achieved by the on-going rowers relieving the off-going rowers one at a time. The crew were only able to move about the boat by crawling on their hands and knees. When not on-watch, the stroke and the watch leader rested in the aft cabin and the rowers allocated the forward positions (positions 3 and 4) rested in the forward cabin. Prior to the accident, Mike Johnson had assisted the skipper in the repair of the boat’s water maker when off-watch during 14 February and had not rested for about 8 hours at the time he was lost overboard. 1.4.6 Previous man overboard During the first 2 weeks of the crossing, two of Toby Wallace’s paying crew fell overboard on separate occasions while moving on the open deck in daylight. Both crewmen managed to hold onto the boat after falling into the water and were recovered back on board without injury. 1.5 BOAT DESIGN AND CONSTRUCTION Toby Wallace was built in 2011 by its skipper. The boat was initially named Titan, and was entered on the UK small ships register in 2012 as a pleasure vessel. It was renamed Toby Wallace in February 2014 and had successfully completed four Atlantic crossings. Toby Wallace was made from carbon fibre/epoxy resin and was 10.8m in length with a breadth of 1.8m and a draught of 0.45m. The boat was based on an ocean rowing boat design that made it self-righting in the event of capsize. It was also manoeuvrable when steering downwind and it could be steered across the sea without difficulty. However, it is reported that Toby Wallace could not be turned or steered into wind in wind speeds above 18kts. Factors influencing the boat’s design included the presumed prevalence of capsize as the cause of previous rowing fatalities and the skipper’s personal experience of capsize both as a rower and as an ocean race organiser. Toby Wallace’s open deck was self-draining and had four rowing positions, each fitted with an aft-facing sliding seat and a fixed footplate with foot straps (Figure 3). Oars were mounted into rowlocks on the gunnels. In common with the other 63 ocean rowing boats built by Woodvale Events Ltd and Woodvale Challenge Ltd, the height of the gunnels above the deck was approximately 300mm in order to keep the oars relatively level when rowing. A rudder on the aft transom was controlled via an electronic pilot control system or by lanyards attached to the tiller. Two dagger boards were fitted towards the bow to aid directional stability and manoeuvrability. Electrical power for navigation aids, radios and a water maker was provided by solar panels and a wind generator.
11 1.6 ONBOARD EQUIPMENT 1.6.1 General The equipment carried on board Toby Wallace, including lifesaving and safety equipment, was based on detailed lists developed by the boat’s owner/skipper when employed by Woodvale Challenge Ltd (see paragraphs 1.7 and 1.8). 1.6.2 Lifejackets, tethers and personal locator beacons Eight manual inflation lifejackets, each fitted with a gas bottle and a lifting becket, were carried on board Toby Wallace, four being located in each of the forward and aft cabins. Four tethers that could be attached to the lifejackets were also carried. Neither the lifejackets nor the tethers were routinely used by the crew. The vessel was equipped with an EPIRB, and one personal locator beacon (PLB)15 was carried on board in an emergency grab bag. 1.6.3 Ankle leashes The ankle leashes were provided on board Toby Wallace (Figure 3) to prevent the rowers from becoming separated from the boat in the event of capsize. The leashes were approximately 3m in length, which was sufficient to allow the wearer to keep clear of the boat as it self-righted. The leashes were manufactured from plastic coated cord with straps fitted with Velcro16-type hook and loop fastenings at each end. The ankle strap was wider than the strap secured to the jackstay line on the port side of the deck. The jackstay line was made from 10mm Dynema rope (breaking strength 4650kg). The rowers wore the leashes during the hours of darkness but they were not routinely worn in daylight hours. During the watch change at 2200 on 14 February 2016, the skipper carried out a leash check soon after his watch were seated. Each rower confirmed that their leash was attached to their ankle and to the line running along the deck. 1.7 OCEANUS ROWING LTD Oceanus Rowing Ltd (formerly Woodvale Challenge Ltd) was established in 2015 to provide individuals with the opportunity to participate in ocean rowing. The company was owned by an experienced ocean rower who was the wife of Toby Wallace’s skipper. The boats operated by the company were registered as privately owned, but they were also listed among its financial assets. During ocean crossings, the company employed a duty officer who was responsible for monitoring the boats’ progress, acting as a point of contact and managing social media and publicity. The company’s website included: Oceanus Rowing provides individuals from a wide variety of ages, abilities and backgrounds with the chance to row an ocean. 15 A PLB is a waterproof and buoyant personal safety device designed to enable SAR services to quickly locate an individual in an emergency. When activated, a PLB transmits a coded message, which includes positional information on the 406MHz distress frequency. 16 Velcro is a registered trademark.
12 We have a fleet of specifically designed ocean rowing boats to offer a unique experience for prospective ocean rowers on-board one of our incredible boats. Rowers can apply for places and pay a single fee on a Pay-Per-Place basis, which covers all your costs to do an ocean row (excludes flights & port accommodations, which we can help with discounted rates). It is an ideal solution for adventurous people who may be unable to devote the time or be able to run their own ocean rowing campaign – it is a cost effective, fun and exciting way to do an ocean row with an outstanding, knowledgeable and experienced professional skipper to give you a one off experience! So join us today – be involved at the cutting edge of ocean rowing with the added incentive of having an adventure of a lifetime rowing an ocean! Ocean rowing is a dangerous sport…and that he/she undertakes the challenge at his/her own risk. When assessing applicants’ suitability to complete an ocean crossing, Oceanus Rowing Ltd took into account their sporting background, sense of adventure, previous rowing experience and their ability to work in a team in confined conditions over a prolonged period of time. 1.8 OCEAN ROWING Ocean rowing is a growing endurance sport that combines physical and mental stamina with technical expertise. The sport has flourished since the first modern races in the 1990’s, although it attracts fewer participants than other physical challenges such as polar expeditions. To date, fewer than 650 successful ocean crossings have been recorded17. Prospective ocean rowers are able to participate in the sport by purchasing a boat, assembling a crew and deciding when and where to travel from and to. Alternatively, they are able to pay for a place on board a boat operated by an ocean rowing company, or they can participate in an organised event or race. The first trans-Atlantic rowing race was held in 1997. Since then, races have been held on a regular basis. Between 2003 and 2012, the rights to organise an annual sponsored race across the Atlantic Ocean were owned by Woodvale Challenge Ltd. Since then, the race has been organised by Atlantic Campaigns SL, based in Spain and has been named the ‘Atlantic Challenge’. 1.9 ATLANTIC CHALLENGE RACE RULES The Atlantic Challenge race starts from La Gomera, Tenerife, and finishes in Antigua, West Indies. The rules that have been adopted by Atlantic Campaigns SL include, inter alia, crew qualification and training requirements and requirements for boat survey, boat registration, boat stability data, and equipment. The current rules were based on those initially developed by Woodvale Challenge Ltd between 2003 and 2011. 17 Data on ocean rowing events and records is kept by the Ocean Rowing Society, which was established in 1983.
13 With regard to qualifications and training, the rules require that each competitor: ● ●Shall have attended the Ocean Rowing Course. ● ●Shall hold a valid Short Range Radio Certificate (VHF). ● ●Shall hold a valid RYA Basic Sea Survival course completion certificate. ● ●Shall hold a valid First Aid at Sea certificate. Each team must also have: Rowed their boat for a minimum of 72 hours, with at least 12 hours of the 72-hour period conducted prior to arrival in La Gomera and at least 12 hours of the 72-hour period conducted during the hours of darkness. During this time all equipment shall be tested. With regard to life-saving equipment, when on deck each rower is required to wear a PLB and either a safety harness and line or a combination lifejacket with a harness and safety line. A support yacht is provided during the Atlantic Challenge. The primary purpose of the support yacht, which carries limited supplies, is to reduce the need to call for third-party assistance. 1.10 LOCAL REQUIREMENTS In light of the experience gained from the numerous rowers getting into difficulty shortly after starting to cross the Atlantic Ocean, the Port Authority of Santa Cruz do Tenerife introduced a number of conditions for departure. These requirements were negotiated with Woodvale Challenge Ltd and included that boats be registered with a national administration, skippers to have completed an RYA Ocean Yachtmaster (theory) course and sea survival training, and that boats be suitably equipped for ocean crossings. Similar requirements did not apply in other port areas in the Canary Islands such as Puerto De Mogan. 1.11 PLEASURE VESSEL REGULATIONS 1.11.1 Definition The Merchant Shipping (Vessels in Commercial Use for Sport or Pleasure) 1998 (SI 1998/2771), as amended, defines a pleasure vessel as: (a) any vessel which at the time it is being used is: (i) (aa) in the case of a vessel wholly owned by an individual or individuals, used only for the sport or pleasure of the owner or the immediate family or friends of the owner; or
14 (bb) in the case of a vessel owned by a body corporate, used only for sport or pleasure and on which the persons on board are employees or officers of the body corporate, or their immediate family or friends; and (ii) on a voyage or excursion which is one for which the owner does not receive money for or in connection with operating the vessel or carrying any person, other than as a contribution to the direct expenses of the operation of the vessel incurred during the voyage or excursion; or (b) any vessel wholly owned by or on behalf of a members’ club formed for the purpose of sport or pleasure which, at the time it is being used, is used only for the sport or pleasure of members of that club or their immediate family, and for the use of which any charges levied are paid into club funds and applied for the general use of the club; and (c) in the case of any vessel referred to in paragraphs (a) or (b) above no other payments are made by or on behalf of users of the vessel, other than by the owner. 1.11.2 Applicable regulations Marine Guidance Note (MGN) 538 (M) - Pleasure Vessels – Guidance and Applicable UK Regulations, provides an overview of the Merchant Shipping legislation that is applicable to pleasure vessels. Paragraph 3.2 of the MGN states: Pleasure vessels less than 13.7 metres in length are not covered by any statutory requirements for the carriage of Firefighting Equipment or Life-Saving Appliances, however, the owner has a duty of care under health and safety legislation where people are employed on-board (see Section 6.4). Owners and skippers should refer to the RYA and British Marine for guidance of any safety equipment for their vessels. 1.12 GOVERNING BODY With regard to the use of commercial vessels for sport or pleasure, MGN 280 (M) - Small Vessels in Commercial Use for Sport or Pleasure, Workboats and Pilot Boats – Alternative Construction Standards includes: 3.4.1. The Code deals with the safety of the vessel and its occupants but not sport or pleasure activities involving special safety requirements. 3.4.2. The objectives for sport have been set out by Government. The principle of self-determination for sports bodies has been encouraged to the extent that when it has been necessary to impose some form of control on such bodies
- such as safety or environmental matters - the policy has usually been to
encourage the bodies to adopt voluntary codes or procedures which would have the same effect as regulation. 3.4.3. In 1990, the Minister for Sport commissioned a review into safety in water sports. The review concluded that the current system of self-regulation developed by the governing bodies of sport is sufficient to meet their responsibility for the safety of sports participants…
15 Ocean rowing boats are not specifically covered by MGN 280 (M), or any of the extant codes of practice for small craft. British Rowing is the national governing body (England) for rowing and has over 30 000 members. It promotes the safety of the sport and provides advice to rowing clubs on planning events and on risk management. To date, British Rowing has had little involvement with ocean rowing. 1.13 PREVIOUS ACCIDENTS 1.13.1 General Since 1990, there have been 204 unsuccessful attempts to row across an ocean that necessitated crew rescue. Records indicated that up to 1999, five fatalities had occurred during ocean rowing crossing attempts. There has been one fatality between 1999 and 2015. There is insufficient evidence available to accurately determine the circumstances of these fatalities. 1.13.2 Fire Ant During the morning of 13 February 2016, Oceanus Rowing Ltd’s ocean rowing boat Fire Ant capsized several times when 400nm north-west of Cape Verde (Figure 1). During the capsizes, the all-female crew of four rowers lost their oars and the boat’s steering system and the GPS were damaged. Fire Ant’s skipper, who was the owner of Oceanus Rowing Ltd, alerted the company’s duty officer via satellite telephone. In turn, the duty officer contacted the coastguard operations centre, Falmouth, and requested assistance. After Fire Ant’s position had been determined by the manual release of the boat’s EPIRB, the coastguard broadcast a “Mayday” to all ships in the area via Enhanced Group Call via Inmarsat C, an element of the Global Maritime Distress and Safety System. The Liberia registered bulk carrier, Rio Grita, responded to the “Mayday” broadcast and diverted towards Fire Ant. Sixteen hours later, the ocean rowing boat’s crew were recovered on board Rio Grita, which arrived in Port Alfred, Canada on 22 February 2016.
16 SECTION 2 - ANALYSIS 2.1 AIM The purpose of the analysis is to determine the contributory causes and circumstances of the accident as a basis for making recommendations to prevent similar accidents occurring in the future. 2.2 LOSS OVERBOARD Mike Johnson was swept from his seat by a large wave that broke over and swamped Toby Wallace. He then rolled over the boat’s low gunnel because he was not adequately tethered. The straps on the footplate by his seat were a rowing aid and the ankle leash was being worn to prevent him separating from the boat in the event of capsize. Neither the foot straps nor the leash, which was 3m in length, were intended to prevent him from falling overboard. After falling overboard, Mike’s ankle leash detached and he quickly became separated from Toby Wallace. The crew were unable to stop the boat from drifting away from him and, although their actions to raise the alarm were timely, it took 11 hours for SAR units to reach Toby Wallace’s remote position in the mid-Atlantic. The sea water temperature was 22°C and Mike was possibly conscious when the red light from his head torch was last seen. That Mike was not wearing a lifejacket or a PLB reduced considerably the likelihood of him surviving and being found. 2.3 BOAT DESIGN Many experienced ocean rowers consider the greatest risk to ocean rowing boats and their crews is capsize. Consequently, like many other ocean rowing boats, Toby Wallace was designed to self-right following capsize. However, it is apparent from the circumstances of this accident, that the risk of a rower falling or being swept overboard from Toby Wallace was also significant. Toby Wallace’s gunnels were only 300mm above the deck in order to keep the rowers, the rowlocks and the sea water surface on a similar plane. The gunnels offered virtually no protection to the crew from the risk of falling overboard. Although the risk of falling overboard was mitigated to some degree by the crew crawling when moving on the deck, it would have been an ever-present concern when operating in rough seas. Toby Wallace’s design also increased the difficulty of recovering a man overboard. In the force 5 to force 6 winds experienced on 14 February, the boat could not be turned into the wind. Further, despite the use of the rudder, holding water, the deployment of a drogue, a parachute anchor and other items, and ballasting to make the boat heavier it could not be stopped in the water. As a result, over the near 1.5 hours that Mike Johnson’s head torch remained visible, Toby Wallace drifted further away from him, and the boat’s crew were unable to attempt a recovery.
17 2.4 CARRIAGE AND USE OF SAFETY EQUIPMENT 2.4.1 Requirements Toby Wallace had been registered by its owner as a pleasure vessel as defined by The Merchant Shipping (Vessels in Commercial Use for Sport or Pleasure) Regulations 1998. As such, and as the boat was also less than 13.7m, it was not required to carry lifesaving equipment. The lifesaving and safety equipment carried on board Toby Wallace was based on the equipment lists developed by Woodvale Challenge Ltd and the skipper’s previous experiences of ocean rowing, rather than on any regulatory requirements. 2.4.2 Ankle leash The use of ankle leashes on board Toby Wallace was a practical measure that was primarily intended to keep a rower attached to the boat following capsize. Ankle leashes are frequently used as the ankle is a suitable location for a long tether and the likelihood of chaffing is reduced. Ankle leashes also do not interfere with body movement while rowing. However, the type of ankle leashes used on board Toby Wallace were the type widely used by surfers and paddle boarders. They were not manufactured or tested to meet any national or international safety standards and the velcro-type fastenings would have been prone to degrade over time through use, immersion and ultra-violet light. In addition, although the breaking strength of the jackstay running along the deck to which they were attached was over 4.5t, the breaking strength of its fixing points was not known. Therefore, both the leash and the jackstay had potential weaknesses that impacted on their reliability. At the start of the watch at 2200 on 14 February 2016, Mike Johnson had confirmed that his ankle leash was attached to his ankle and the jackstay. Therefore, unless he removed his ankle strap later in the watch, his rapid separation from Toby Wallace after falling overboard indicates that the Velcro-type ankle strap on his leash had come undone or slipped off his leg. When Mike fell into the water, Toby Wallace was still making approximately 3kts of headway. Consequently, it is possible that sufficient force was generated to separate the Velcro-type fastenings, which might have degraded over time in the marine environment or might not have been securely fastened from the outset. 2.4.3 Lifejackets and tethers Toby Wallace was equipped with eight manual inflation lifejackets and four tethers. The vessel was not carrying any form of safety harnesses, and so the tethers could only be used in combination with the lifejackets. Mike was wearing oilskins at the time of the accident, but neither a lifejacket nor tether. Had he been doing so, the tether would have kept him beside Toby Wallace and he would have been able to inflate the lifejacket if he needed buoyancy before the crew helped him back on board. The prolonged wearing of lifejackets while ocean rowing is commonly considered to be impractical. The wet and salty environment can lead to clothing and lifejackets chafing the rowers’ skin as they row, resulting in open sores. Further, there is a view
18 that lifejackets can impede the action of rowing. As a consequence, when conditions allow, some rowers prefer to row naked. That Toby Wallace’s crew did not routinely wear lifejackets when rowing was not unusual among ocean rowers. As the tethers on board could be used effectively only if they were attached to the lifejackets, they too remained unused. Conditions at the time of the accident were sufficiently poor that the crew on deck had elected to wear oilskins. That the circumstances had not also prompted them to wear their lifejackets and connect their tethers indicates they had not considered there was a risk of falling or being washed overboard. 2.4.4 Personal locator beacon Unlike Atlantic Challenge rowing, where each rower is required to wear a PLB when on deck, Toby Wallace’s crew were not required to do so, nor were there sufficient PLB’s on board for each member of the crew. In sea water at a temperature of 22ºC, Mike Johnson could have been expected to survive between 2 and 40 hours18 following his immersion shortly after 2300 on 14 February. Given that the SAR aircraft were on scene the following day from 1100 and Sea Pearl from 1230, had Mike been wearing a PLB, it would potentially have enabled MRCC Ponta Delgada to locate and track him in the water and to direct the aircraft and Sea Pearl towards his position. 2.4.5 Man overboard That two of Toby Wallace’s rowers had fallen overboard a few days after the boat had set off from Puerto De Mogan highlights that the risk of falling overboard from such a low-sided boat with a narrow beam was significant. On those occasions, the rowers managed to hold onto the boat and were recovered without injury. In the rough sea conditions experienced when Mike Johnson was swept overboard, he was unable to hold onto Toby Wallace. Toby Wallace would not steer into strong winds. For reasons of practicality, its crew also did not wear lifejackets which prevented the use of the tethers that were carried on board. Therefore, the successful recovery of Mike Johnson depended on him remaining connected to the boat and the boat being stopped in the water. It is of concern that neither were achieved due to the detachment of Mike’s ankle leash and the parachute anchor. Although Toby Wallace had conducted a manoverboard drill in Puerto De Mogan, the safety equipment carried on board and the lack of instructions and procedures for its use, indicate that the risk of a rower falling overboard had not been properly considered. The increased likelihood of a person falling over the side due to the boat’s low gunnels, the difficulties likely to be encountered in recovering a person from the water due to its manoeuvring characteristics, and the foreseeable flaws in the reliability of the ankle leashes were all significant factors that warranted a far more robust assessment of the safety equipment required and how and when it was to be used. 18 United States Search and Rescue Task Force – Cold water survival.
19 2.5 PREPARATION AND TRAINING Toby Wallace’s skipper and first mate were experienced ocean rowers, but the remainder of the crew were not. Therefore, it was unlikely that the short time some of the crew rowed together over the weekend in August 2015, and all of the crew rowed together shortly before leaving Gran Canaria, was sufficient to adequately prepare them for a 31-day ocean crossing. The man overboard recovery in the relatively sheltered waters of Puerto De Mogan would not have prepared them to cope with a man overboard at night in seas with 6m waves. Furthermore, in view of the nature of the intended voyage, it is astonishing that sea survival training was not a requirement for all crew and that the crew did not have to meet a medical standard. 2.6 EMERGENCY RESPONSE The capsize and abandonment of Fire Ant on 13 February 2016 and the loss of a rower overboard and abandonment of Toby Wallace 2 days later highlight the vulnerability of ocean rowing boats. In both cases, Oceanus Rowing Ltd’s duty officer in the UK was pivotal to the safety of the boats’ crews. By alerting the coastguard to the difficulties encountered by Fire Ant and then quickly confirming the position of Toby Wallace, and providing contact details for the boat’s skipper, the duty officer ensured that SAR action was initiated promptly. However, the accidents involving Toby Wallace and Fire Ant also demonstrate that small boats that cross the oceans independently rely heavily on passing merchant vessels and distant SAR services for assistance in the event of an emergency. Unlike participants in organised events, such as the Atlantic Challenge, which have a support vessel, independent boats frequently have little or no assistance at hand. It took Sea Pearl about 12 hours to reach Toby Wallace, and it took Rio Grita 16 hours to reach Fire Ant. As prompt assistance is unlikely to be available in mid ocean, the need to ensure that all ocean rowing boats and their crews are appropriately prepared and equipped is compelling. 2.7 GOVERNANCE 2.7.1 Commercial operation It is clear from the fees paid by the ‘pay for place’ rowers, the skipper’s remuneration, and that Toby Wallace was listed as one of Oceanus Rowing Ltd’s company assets that the vessel was being commercially operated. However, Toby Wallace could not comply with the requirements of MGN 280, and there were no alternative standards set by the national governing body that could be applied instead. It is arguable that, without appropriate certification, Toby Wallace should not have operated commercially, but there were no avenues by which commercial certification could be achieved. Nonetheless, the registration of Toby Wallace as a pleasure vessel in the skipper’s name was inappropriate as it gave a misleading impression of the vessel’s status, and of the standards of practice that should have been applied to its activities. Although ocean rowing is an extreme and potentially dangerous sport, commercial operators have a duty of care towards rowers who are paying to participate. Relevant considerations to be taken into account when discharging this duty of care could include: the suitability of the vessel; provision of individual and collective safety
20 equipment; and that the rowers themselves are trained, mentally prepared and medically fit to undertake the crossing. The significant variance in the approaches adopted by Atlantic Campaigns SL (see section 1.9) and by Oceanus Rowing Ltd indicate a need to develop a set of codes or procedures for ocean rowing to guide those with a duty of care towards fee paying customers. 2.7.2 Best practice Only one ocean rower is recorded as having died during an ocean crossing between 1999 and 2015 (paragraph 1.13.1), despite the high number of failed attempts. This is likely to be due to improved vessel design, particularly with regard to the ability of the craft to self-right following capsize. There is also much evidence that some operators are attempting to improve safety by the fitting of safety features such as guardrails (Figure 7), guard wires (Figure 8), and by the use of safety harnesses and tethers (Figure 9). However, other operators are concerned that measures taken to reduce the risk of a person being lost overboard could increase the risk of entrapment following capsize. These disparate approaches can result in a single type of hazard receiving prominence at the expense of measures to mitigate other risks. There is therefore a need for the ocean rowing community to coalesce for the purposes of sharing best practice and developing safety standards for their sport. If deemed appropriate, these safety standards could be taken forward by the national governing body (see section 1.12) and proposed to the marine regulators for use as the basis for commercial certification. Figure 7: An ocean rowing boat fitted with guardrails Image courtesy of www.alanlau.co.uk
21 Figure 8: An ocean rowing boat fitted with guard wires Figure 9: Use of a safety harness, tethers and jackstay Jackstay Safety tether Safety harness
22 SECTION 3 - CONCLUSIONS 3.1 SAFETY ISSUES DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS
The rowers on board Toby Wallace were not suitably tethered. The ankle leashes were intended to keep rowers close to the boat in the event of capsize and the foot straps were a rowing aid. [2.2]
Toby Wallace’s gunnels were only 300mm above the deck and provided virtually no protection to the crew from the risk of falling overboard. [2.3]
Toby Wallace’s design increased the difficulty of recovering a man overboard. The boat could not be turned into the strong wind or stopped and, as a result, its crew were unable to even attempt a recovery. [2.3]
The ankle leashes used on board Toby Wallace were not manufactured or tested to meet any national or international safety standards, and were therefore not sufficiently reliable for use as safety equipment. [2.4.2]
Although lifejackets carried on board Toby Wallace were not used by the crew, this was common practice among ocean rowers. [2.4.3]
Only one personal locator beacon was carried on board. [2.4.4]
The risk of a person falling overboard from Toby Wallace had not been properly assessed. Consequently, appropriate mitigation measures had not been put in place. [2.4.5]
The crew’s preparation and training were insufficient to deal with a 31-day ocean passage and the recovery of a person overboard at night and in rough seas. [2.5]
Toby Wallace was operating as a commercial vessel but was not certified to do so. The need to address the governance of commercially operated ocean rowing boats is compelling. [2.7.1]
Ocean rowing has developed best practice that has improved safety, but inconsistencies in its application indicate that it could be better promulgated. [2.7.2] 3.2 OTHER SAFETY ISSUES NOT DIRECTLY CONTRIBUTING TO THE ACCIDENT19
The accidents involving Toby Wallace and Fire Ant demonstrate the dependency of independent ocean rowing boats on passing merchant vessels and distant SAR services for assistance. [2.6] 19 These safety issues identify lessons to be learned. They do not merit a safety recommendation based on this investigation alone. However, they may be used for analysing trends in marine accidents or in support of a future safety recommendation
23 SECTION 4 - ACTIONS TAKEN 4.1 ACTIONS TAKEN BY OTHER ORGANISATIONS Atlantic Campaigns SL has: ● ●Forwarded a proposed ‘Ocean Rowing Code of Practice’ to British Rowing for review, adoption and promulgation.
24 SECTION 5 - RECOMMENDATIONS British Rowing and the Maritime and Coastguard Agency are recommended to: 2017/101 Work together in order to assess the feasibility of developing means by which commercially operated ocean rowing boats can demonstrate equivalent safety standards to those required of other small vessels in commercial use for sport or pleasure. British Rowing is recommended to: 2017/102 Liaise with stakeholders to develop and promulgate a best practice guide or a code of practice for ocean rowing, taking into account, inter alia: ● ●Boat design, construction and stability ● ●Minimum training requirements ● ●Minimum equipment requirements ● ●Onboard procedures ● ●Shore-based and seaborne support. Oceanus Rowing Limited is recommended to: 2017/103 Review its risk assessments for the conduct of future ocean crossings and take measures as necessary to ensure its crews are appropriately fit, trained and competent, and the necessary equipment, training and procedures are in place to reduce the risk of rowers coming to harm to as low as reasonably practicable. Safety recommendations shall in no case create a presumption of blame or liability
Marine Accident Report
FD06051 | 2017_英国_safety-warning-after-explosion-on-container-vessel-manhattan-bridge-results-in-1-fatality.pdf
分类:06_境外及港澳台调查报告 | 年份:2017 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
Extracts from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 Regulation 5: “The sole objective of a safety investigation into an accident under these Regulations shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of such an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” Regulation 16(1): “The Chief Inspector may at any time make recommendations as to how future accidents may be prevented.” NOTE This bulletin is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2017 See http://www.nationalarchives. gov.uk/doc/open-government- licence for details. All bulletins can be found on our website: https://www.gov.uk/maib For all enquiries: Email: maib@dft.gsi.gov.uk Tel: 023 8039 5500 Fax: 023 8023 2459 Press Enquiries: 01932 440015 Out of hours: 020 7944 4292 Public Enquiries: 0300 330 3000 M A R I N E A C C I D E N T I N V E S T I G AT I O N B R A N C H SAFETY BULLETIN SB1/2017 June 2017 1 Auxiliary boiler explosion on board the container ship Manhattan Bridge at Felixstowe container terminal, England resulting in one fatality and one serious injury on 19 January 2017 Figure 1: Manhattan Bridge Image courtesy of Ron van de Velde
2 MAIB SAFETY BULLETIN 1/2017 This document, containing safety lessons, has been produced for marine safety purposes only, on the basis of information available to date. The Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 provide for the Chief Inspector of Marine Accidents to make recommendations at any time during the course of an investigation if, in his opinion, it is necessary or desirable to do so. The Marine Accident Investigation Branch is assisting the Japan Transport Safety Board (JTSB) in carrying out an investigation into the auxiliary boiler explosion on board Manhattan Bridge, resulting in one fatality and one serious injury. The JTSB will publish a full report on completion of the investigation. Steve Clinch Chief Inspector of Marine Accidents NOTE This bulletin is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall not be admissible in any judicial proceedings whose purpose, or one of whose purposes, is to apportion liability or blame. This bulletin is also available on our website: www.gov.uk/maib Press Enquiries: 01932 440015; Out of hours: 020 7944 4292 Public Enquiries: 0300 330 3000 Steve Clinch's signature
3 BACKGROUND At about 2304 on 19 January 2017, an auxiliary boiler furnace explosion occurred in the engine room on board the Japan registered container ship Manhattan Bridge (Figure 1) as it was berthing alongside a container terminal in Felixstowe, England. Manhattan Bridge’s second engineer and an engine room oiler were investigating a boiler flame failure alarm at the time and were caught by the blast. The oiler suffered severe injuries and died soon after the explosion. The second engineer suffered burn injuries to his face and right arm, which required a skin graft. The Japan Transport Safety Board (JTSB) is conducting a full investigation into the causes and circumstances of the accident and, in accordance with the IMO Casualty Investigation Code, will publish its findings in due course. The UK Marine Accident Investigation Branch (MAIB) deployed inspectors to Felixstowe to conduct an initial accident site investigation. Its findings have prompted the MAIB to publish this safety bulletin, which is designed to raise awareness of a safety issue that might be linked to the initial boiler flame failures. EVENTS LEADING UP TO THE ACCIDENT Manhattan Bridge had been operating in the North Sea Sulphur Emission Control Area (SECA) for several days prior to the accident. In order to comply with international emissions control standards1, the auxiliary boiler fuel supply had been switched from heavy fuel oil (HFO) to marine gas oil (MGO). The MGO was loaded at Rotterdam in November 2016 and was declared as meeting the quality standards set out in ISO 8217:2005 – Petroleum products – Fuels (class F) - Specifications of marine fuels. In the hours leading up to the accident, the auxiliary boiler had cut out several times due to flame or ignition failures, and on each occasion, the fault was investigated and the boiler reset by the second engineer. The boiler explosion occurred while the second engineer and the oiler were trying to restart the boiler burner unit following a flame failure cut-out. The force of the explosion blew open the boiler burner unit door (Figure 2) and propelled the burner’s air diffuser into the engine room (Figure 3). The oiler was standing directly in front of the burner unit and the second engineer was close by. INITIAL FINDINGS Following the incident, examination of the boiler fuel system by the burner unit manufacturer identified the build-up of waxy deposits in the supply filter, sufficient to restrict the fuel flow (Figure 4). Samples of the MGO being burnt at the time of the accident were taken by the MAIB and sent to a laboratory for analysis. The samples were tested in accordance with specifications set out in the latest ISO 8217:2017 standard, which included Cloud Point (CP), Cold Filter Plugging Point (CFPP) and Pour Point (PP) tests. The tests found that the fuel had a CFPP of 14°C and a PP of less than -9°C, requiring a minimum fuel operating temperature of 15°C. The ambient air temperature at Felixstowe on 19 January 2017 was about 4°C, low enough for wax formation. The CP of the fuel could not be obtained because the test samples had a dark appearance, which was attributed to the mixing of residual HFO deposits with the MGO in the system pipework. 1 On 1 January 2015, the sulphur emissions limits within the designated maritime SECAs were reduced from 1.0% to 0.1% by mass, which has resulted in an increased demand for MGO bunkers across the shipping sector.
4 Figure 2: Boiler and burner unit Figure 3 Burner unit Boiler fuel supply pipework Failed burner hinge Air diffuser
5 SAFETY ISSUE Industry reports indicate an increased incidence of boiler and marine diesel engine performance problems in colder waters following the implementation of the more stringent sulphur emissions limit. This has been attributed to the increased paraffin content found in some low sulphur distillate fuels (MGOs) and the subsequent formation of waxy deposits or crystals as the fuel temperature falls. Restricted fuel flow due to wax deposits in filters and pipework can cause intermittent and incomplete combustion to the point of flame failure. The paraffin content of MGOs varies globally due to the regional composition of crude oil and variation in refinery processes. There are three measurable stages in the waxing process for distillate fuels; these are CP, CFPP and PP. The first discernible stage, CP, is defined as the temperature at which wax crystals start to visibly form in the fuel and a transparent fuel becomes cloudy or hazy. The CFPP is the lowest temperature where the fuel of a set volume, drawn, by vacuum, through a standardised filter (45 micron) within a specified time (60 sec) still continues to flow. The PP is the lowest temperature at which the fuel will continue to flow when cooled. The PP does not provide any indication of the temperature at which filtration issues may occur. Prior to March 2017, the ISO 8217 standard, often used by the shipping industry as the baseline specification when ordering and testing fuel oil bunkers, focused on PP and did not include test specifications for CP or CFPP. As a consequence, the MGO loaded on board Manhattan Bridge in Rotterdam was not subject to CP or CFPP testing. Figure 4 Waxy deposits in fuel line filter
6 SAFETY LESSONS It is essential that vessel operators carefully consider anticipated ambient air and sea temperatures that will be experienced during the voyage when purchasing low sulphur MGO bunkers. Such information should be used to identify the required cold flow characteristics of the fuel being supplied using CP and CFPP as key metrics. When this is impractical, it is important to establish the CP and CFPP of the fuels carried on board through sample testing. When operating in cold climates, the risk of waxy residue developing in the vessel’s fuel lines can be controlled by: ● ●Closely monitoring the visual appearance of low sulphur MGO bunkers for signs of wax precipitation. ● ●Conducting regular fuel filter inspections and close monitoring of fuel system pressures. ● ●Maintaining the temperature of the low sulphur MGO in the vessel’s tanks and pipework above the CP and CFPP temperatures to avoid the possibility of filter blocking. The addition of cold-flow improver chemicals to the low sulphur MGO in the vessel’s storage tanks should only be considered as a last resort under the strict guidance of an additive supplier. More detailed guidance2 on the cold flow properties of MGOs can be found on the International Council on Combustion Engines (CIMAC) website: www.cimac.com. Issued June 2017 2 01/2015 CIMAC Guideline: Cold flow properties of marine fuel oils. 06/2015 CIMAC Position Paper: New 0.1% sulphur marine (ECA) fuels.
FD06052 | 2017_英国_sinking-of-vivier-creel-boat-louisa-with-loss-of-3-lives__MAIBInvReport17_2017.pdf
分类:06_境外及港澳台调查报告 | 年份:2017 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
M A R I N E A C C I D E N T I N V E S T I G AT I O N B R A N C H ACCIDENT REPORT VERY SERIOUS MARINE CASUALTY REPORT NO 17/2017 JULY 2017 Report on the investigation of the foundering of the fishing vessel Louisa SY30 while at anchor off the Isle of Mingulay in the Outer Hebrides on 9 April 2016 resulting in three fatalities
Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2017 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. All MAIB publications can be found on our website: www.gov.uk/maib For all enquiries: Marine Accident Investigation Branch Spring Place 105 Commercial Road Southampton Email: maib@dft.gsi.gov.uk United Kingdom Telephone: +44 (0) 23 8039 5500 SO15 1GH Fax: +44 (0) 23 8023 2459 Press enquiries during office hours: 01932 440015 Press enquiries out of hours: 020 7944 4292
CONTENTS GLOSSARY OF ABBREVIATIONS AND ACRONYMS SYNOPSIS 1 SECTION 1 - FACTUAL INFORMATION 2 1.1 Particulars of Louisa and accident 2 1.2 Background 3 1.3 Narrative 3 1.3.1 The accident 3 1.3.2 Emergency response 4 1.4 Crew 8 1.5 Vessel and operation 9 1.5.1 Vessel description 9 1.5.2 Vivier system 10 1.5.3 Engine room 11 1.5.4 Bilge system 11 1.5.5 Hold and fore peak 12 1.5.6 Accommodation 12 1.6 Wreck recovery 12 1.7 Vessel examination 13 1.7.1 Vessel status 13 1.7.2 Hull and structure integrity 14 1.7.3 Pipe systems 14 1.7.4 Refloating 16 1.8 Modelling of foundering scenarios 16 1.8.1 General 16 1.8.2 Engine room flooding 16 1.8.3 Hold flooding 17 1.8.4 Hold flooding in combination with water on deck 17 1.9 Lifesaving appliances 17 1.9.1 Lifesaving appliances carried on board Louisa 17 1.9.2 Liferaft 17 1.9.3 Post-accident inspections of the HRU and liferaft 18 1.9.4 Testing and examination of the CO2 inflation cylinder 18 1.9.5 Lifejackets – regulatory requirements 19 1.9.6 Approval process for novel lifesaving appliances 22 1.9.7 Approval of the Cosalt Premier (32kg or more) solid-filled lifejacket 22 1.9.8 MAIB lifejacket trials and subsequent testing 24 1.9.9 Emergency position indicating radio beacon 25 1.10 Search and rescue 25 1.10.1 EPIRB description 25 1.10.2 Cospas-Sarsat system description 27 1.10.3 Terminology 28 1.10.4 UK EPIRB response 28 1.10.5 HMCG operational manning 29 1.11 Effects of cold water immersion 30 1.12 Urgency of response 31 1.13 Previous/similar accidents 31
SECTION 2 - ANALYSIS 35 2.1 Aim 35 2.2 Overview 35 2.3 Vessel status 35 2.4 Fatigue 36 2.5 Vessel foundering 36 2.6 Abandoning the vessel 37 2.7 Cold water survival 38 2.8 Lifesaving appliances 38 2.8.1 The liferaft - onboard management 38 2.8.2 The liferaft - servicing 39 2.8.3 Lifejackets 39 2.8.4 Inflatable PFDs 40 2.8.5 LSA maintenance 40 2.9 Search and rescue 41 2.9.1 Summary of key times and events 41 2.9.2 UKMCC/HMCG interface 41 2.9.3 Speed of response 42 2.9.4 Response to Louisa’s EPIRB alert 43 2.9.5 Incident location 43 2.9.6 Network activity 44 SECTION 3 - CONCLUSIONS 45 3.1 Safety issues directly contributing to the accident that have been addressed or resulted in recommendations 45 3.2 Other safety issues 46 SECTION 4 - ACTION TAKEN 47 4.1 MAIB actions 47 4.2 Actions taken by other organisations 47 SECTION 5 - RECOMMENDATIONS 48 FIGURES Figure 1
Louisa – general arrangement Figure 2
Accident location and positional information Figure 3
Louisa – working deck Figure 4
Louisa – transporting to River Clyde Figure 5
Lousia – engine controls as found Figure 6
System drawing – as found Figure 7
Liferaft at Barra police station Figure 8
CO2 cylinder as found
Figure 9
Recalled CO2 cylinder of a similar type to that of Louisa’s cylinder Figure 10
Lifejackets at Barra police station Figure 11
MAIB lifejacket trials Figure 12
Louisa – EPIRB Figure 13
Cospas-Sarsat system diagram Figure 14
Hold/fore peak drain TABLES Table 1
Loss condition estimated loading Table 2
Summary of key times and events ANNEXES Annex A
Materials Technology Ltd – CO2 cylinder report
Annex B
Marchwood Scientific Services – water analysis report Annex C
Extract from A.689(17) and MSC.81(70) – Recommended lifejacket water performance tests Annex D
Extracts from MSC.200(80) – Amended recommended lifejacket water performance tests Annex E
Extract from MSC.378(93) – Further amendments to recommended lifejacket water performance tests Annex F
Extract from MSC.378(93) – Amended design and construction requirements for an RTD Annex G
HMCG’s standard operating procedure for satellite distress beacon alerts Annex H
MAIB Flyer to the Fishing Industry Annex I
Cosalt Premier (32kg or more) lifejacket – testing and type approval certificates
GLOSSARY OF ABBREVIATIONS AND ACRONYMS AIS
Automatic Identification System ALB
All Weather Lifeboat ARCC
Aeronautical Rescue Co-ordination Centre BOSIET
Basic Offshore Safety Induction and Emergency Training (course) CERS
Consolidated European Reporting System CGOC
Coastguard Operations Centre cm
centimetre CO2
Carbon Dioxide DLA
Deputy Launch Authority EC
European Community EFF
European Fisheries Fund EMSA
European Maritime Safety Agency EPIRB
Emergency Position Indicating Radio Beacon GEOLUT
Geostationary Local User Terminal GEOSAR
Geostationary Search and Rescue (satellite) GNSS
Global Navigation Satellite System HMCG
HM Coastguard hr
hour HRU
Hydrostatic Release Unit IAMSAR
International Aeronautical and Maritime Search and Rescue (Manual) IHAC
(Department for Transport) In House Analytical Consultancy (team) IMDatE
Integrated Maritime Data Environment IMO
International Maritime Organization kg
kilogram kt
knot kVA
kilo-volt-ampere kW
kilowatt
LEOSAR
Low Earth Orbiting Search and Rescue (satellite) LOA
length overall LSA
Lifesaving appliances LUT
Local User Terminal m
metre MCA
Maritime and Coastguard Agency MCC
Mission Control Centre MGN
Marine Guidance Note MHz
Megahertz mm
millimetre MOO
Maritime Operations Officer MRCC
Maritime Rescue Co-ordination Centre MSN
Merchant Shipping Notice N
Newton NMOC
National Maritime Operations Centre nm
nautical mile ORC
Offshore Racing Council PDF
Protected Data Field PFD
Personal Flotation Device RAF
Royal Air Force RNLI
Royal National Lifeboat Institution rpm
revolutions per minute RTD
Reference Test Device s
second SAR
Search and Rescue SFF
Scottish Fishermen’s Federation Sitrep
Situation report SMOO
Senior Maritime Operations Officer
SOLAS
International Convention for the Safety of Life at Sea 1974, as amended t
tonne UKMCC
United Kingdom Mission Control Centre UTC
Universal Co-ordinated Time VHF
Very High Frequency VMS
Vessel Monitoring System TIMES: all times used in this report are UTC unless otherwise stated
1 SYNOPSIS Early on 9 April 2016, the fishing vessel Louisa foundered, with the loss of three lives, while anchored close to the shore in Mingulay Bay in the Outer Hebrides. The skipper and crew, who had been working long hours before anchoring late the previous evening, had woken suddenly as the vessel was sinking rapidly by the bow. They were able to escape to the aft deck, activate the emergency position indicating radio beacon (EPIRB), and to don lifejackets. However, they were unable to inflate the liferaft as they abandoned the vessel. At 0232, an alert from Louisa’s EPIRB was detected by a geostationary search and rescue satellite and forwarded through the Cospas-Sarsat system to the United Kingdom Mission Control Centre (UKMCC). The UKMCC relayed the alert to HM Coastguard, but confusion over terminology resulted in delays before search and rescue units were sent to the scene. When Barra lifeboat arrived in Mingulay Bay, the crew were able to assist one crewman, who had swum to the shore and climbed onto rocks. They located the uninflated liferaft and beside it found the skipper and one crewman unresponsive and face down in the water, despite wearing approved abandonment lifejackets. The other crewman had attempted to swim to the shore and was found, also face down and unresponsive, still wearing his lifejacket, close to the beach. The skipper’s body was lost as the lifeboat crew attempted to recover him and remains missing. The MAIB investigation included salvaging the wreck to determine the cause of flooding, inspection and testing of the liferaft, lifejacket trials and testing, and a review of the search and rescue response. The Maritime and Coastguard Agency has since taken action to enhance its guidance in respect of liferaft servicing requirements. The circumstances of this accident, and subsequent trials and testing undertaken, have raised concerns about the effectiveness of the lifejackets worn by Louisa’s skipper and crew. Recommendations have been made to Louisa’s owners regarding vessel maintenance, safety equipment servicing and risk assessments, and to the liferaft servicing company and its sub-contractor in respect of work processes. The Maritime and Coastguard Agency has been recommended to: urgently conduct research designed to confirm or otherwise the suitability of lifejacket water performance test requirements, and to bring any shortcomings identified to the attention of the International Maritime Organization; and to update and enhance its response to satellite distress beacon alerts.
2 SECTION 1 - FACTUAL INFORMATION 1.1 PARTICULARS OF LOUISA AND ACCIDENT SHIP PARTICULARS Vessel’s name Louisa Flag United Kingdom Classification society Not applicable IMO number/fishing numbers SY30 Type Vivier creel boat Registered owners Privately owned Manager(s) Not applicable Construction Steel Year of build 2008 Length overall 14.95m Registered length 14.15m Gross tonnage 32 Minimum safe manning Not applicable Authorised cargo Not applicable VOYAGE PARTICULARS Port of departure Uig, Isle of Skye Port of arrival Uig, Isle of Skye (intended) Type of voyage Commercial Cargo information Shellfish Manning 4 MARINE CASUALTY INFORMATION Date and time 09/04/2016 0232 UTC Type of marine casualty or incident Very Serious Marine Casualty Location of incident Isle of Mingulay Place on board Hold Injuries/fatalities 3 fatalities Damage/environmental impact Constructive total loss/none Ship operation At anchor Voyage segment Anchored External & internal environment Night, visibility good, wind light airs variable direction, sea state slight. Sea temperature 10ºC, air temperature 8ºC. Persons on board 4
3 1.2 BACKGROUND Louisa generally operated around the Western Isles fishing for lobster, crab and prawns. Each trip was usually 6 days’ duration, departing on a Monday afternoon and landing the catch on the following Sunday, during which time the catch was kept alive in a vivier tank. The intensity of fishing varied depending upon quantity of catch, weather conditions and the skipper’s preference. The relief skipper normally aimed to recover and shoot each string of creels twice during the trip, whereas the regular skipper aimed to recover and shoot each string three times per trip. The intention on this trip was for each string to be recovered and relaid three times, which could amount to hauling about 1,000 creels per day. Catch was normally landed at the port of Uig on the Isle of Skye, with a weekly call into Stockinsh on the Isle of Lewis to allow the owners to carry out any maintenance required. The crew generally completed 3 weeks on board, followed by a week of leave, but the regular skipper could spend several months on the vessel without a break. There was a pool of seven crew (including the relief skipper) with either the skipper plus three, or occasionally four, crew on board during each fishing trip. 1.3 NARRATIVE 1.3.1 The accident On Sunday 3 April 2016, Louisa berthed in Uig to discharge catch and conduct a crew change during which the relief skipper left and Paul Alliston, the vessel’s regular skipper, took over. Another crew member left at short notice, and sailing was delayed while a relief crewman travelled from the mainland to join the vessel. Photograph courtesy of Trawlerphotos.co.uk Louisa
4 Louisa sailed late evening on Monday 4 April, and motored for about 7 hours to reach the first string of creels. Fishing then continued through Tuesday, Wednesday and Thursday, with the live catch being loaded into the vivier tank. The vessel berthed at North Bay on the Isle of Barra to load an additional 20 boxes of fish offal as bait. Having loaded the bait, the vessel returned to its fishing grounds. Some of the boxes of bait were stored in the port bait locker, a refrigerated compartment in the hold. The remainder of the boxes were stowed in various locations on the main deck with a number placed directly aft of the hold hatch coaming. Fishing continued into Friday evening when Louisa’s skipper recognised that the crew, who had been working for approximately 20 hours per day, were too tired to continue safely. He decided to anchor in Mingulay Bay (a recognised anchorage off the uninhabited Isle of Mingulay), to enable the crew and himself to rest. At approximately 2230, he anchored Louisa about 200m from the shore. He and the crew then set about tidying the working deck and hosing down using the deck wash pump, while a meal was prepared. When the meal was ready the skipper and crew went to the mess room to eat it, after which they all went to bed in the accommodation. The crew woke suddenly in the early hours of Saturday morning, 9 April, to find the vessel significantly down by the head and apparently foundering bow first. Wearing only light clothing they quickly exited the accommodation via the wheelhouse and onto the aft deck, by which time the vessel’s bow was fully submerged and water was encroaching on the wheelhouse windows (Figure 1). The skipper told the crew to launch the liferaft and activate the EPIRB while he collected lifejackets from a locker located in the wheelhouse. One of the crew released the liferaft canister from its cradle and unsuccessfully attempted to inflate the liferaft by pulling on the painter. The canister was then removed from the cradle and its securing straps cut to remove the uninflated liferaft. Further attempts were then made to operate the liferaft’s CO2 inflation cylinder, all of which failed. By this time, the crew were standing on the aft bulkhead of the wheelhouse with the vessel almost vertical and foundering rapidly. The crew then worked together to place some plastic buoys inside the liferaft to give it buoyancy, and then pushed it into the water. By now, the skipper and crew had all donned lifejackets. Two of the crew jumped onto the liferaft, which initially supported their weight but, as the others jumped on, it began to sink. Martin Johnstone immediately decided to attempt to swim to the shore. The skipper and remaining crew, conscious of their sea survival training, decided to remain with the partially floating liferaft. After several minutes it became apparent that the liferaft was drifting further out to sea. After discussing their options, one of the remaining crew also decided to attempt the swim to shore while the skipper and Christopher Morrison chose to remain with the liferaft. Louisa foundered and sat on the seabed in approximately 10m of water. 1.3.2 Emergency response At 0232 UTC, an alert from Louisa’s EPIRB was detected by geostationary search and rescue (GEOSAR) satellite MSG3, which automatically forwarded it to the French geostationary local user terminal (GEOLUT). The information then
5 Figure 1: Louisa - general arrangement Bulkhead Fore peak Hold hatch
6 automatically passed to the United Kingdom Mission Control Centre (UKMCC). The information included a position for the beacon of 56º 45.00’N, 007º 30.00’W (Figure 2). By 0239, UKMCC had initiated a new incident on the HM Coastguard (HMCG) live information system (Vision 4) and had informed Coastguard Operations Centre (CGOC) Falmouth via fax and telephone call that the alert had been received. The alert was initially logged as an unresolved 406 alert. At 0244 UKMCC entered the position for the EPIRB into Vision 4. The EPIRB’s details were then entered and, by 0250, UKMCC had passed co-ordination of the incident response to CGOC Falmouth. At 0251, CGOC Falmouth made CGOC Stornoway aware of the alert and requested it attempt to contact Louisa by all available means. Despite numerous calls to the registered emergency numbers associated with the EPIRB and very high frequency (VHF) radio calls to the vessel, CGOC Stornoway was unable to establish contact with Louisa or its owners. At 0241, an alert from Louisa’s EPIRB was detected by GEOSAR satellite MSG2 and passed to the Greek GEOLUT. This information, which was again automatically passed to UKMCC, included an updated position for the beacon of 56º 48.73’N, 007º 37.40’W. It is reported that UKMCC received this information at 0251. However, the refined position did not appear on Vision 4 until 0312 when it became visible to CGOC Falmouth. At 0306, the National Maritime Operations Centre (NMOC) noted on Vision 4 that it was aware of the EPIRB alert and was monitoring the narrative. During a telephone conversation between CGOC Falmouth and UKMCC, UKMCC staff expressed uncertainty as to the accuracy of the updated position and that a low earth orbiting search and rescue (LEOSAR) satellite pass would be able to confirm the position. With the next LEOSAR satellite pass not scheduled until 0410, CGOC Falmouth staff pressed for confirmation that the EPIRB alert included a Global Navigation Satellite System (GNSS) position. After further discussion, UKMCC staff confirmed that the updated position of Louisa’s EPIRB was accurate to within 120m. At 0316, CGOC Falmouth passed responsibility for co-ordinating the Search and Rescue (SAR) response to the incident to CGOC Stornoway, and confirmed that the updated position for Louisa’s EPIRB was accurate to 120m. At 0322, CGOC Stornoway staff paged Barra all weather lifeboat (ALB) deputy launch authority (DLA), who telephoned them to obtain further information about the incident. He then authorised an immediate launch of Barra ALB and requested that CGOC Stornoway page the lifeboat’s crew. The lifeboat crew were paged at 0333 and the ALB launched at 0340. At 0327, CGOC Stornoway staff contacted the Aeronautical Rescue Co-ordination Centre (ARCC) and requested the launch of a SAR helicopter. ARCC staff requested Stornoway CGOC page the crew for aircraft R948. At 0344, CGOC Stornoway recorded in Vision 4 that it had paged the aircraft crew and that a fault with the communication equipment had caused a delay in activating the pagers.
7 Figure 2: Accident location and positional information Reproduced from Admiralty Chart BA 1796-0 by permission of the Controller of HMSO and the UK Hydrographic Office
8 At 0356, CGOC Humber staff contacted CGOC Stornoway to advise that a position taken from the European Maritime Safety Agency (EMSA) IMdatE1 system placed Louisa in Mingulay Bay at 0140 that morning. Barra ALB proceeded to Mingulay Bay and arrived on scene at 0413. The crew immediately set off white parachute flares to illuminate the area. There was no sign of Louisa, which by then had foundered in 10m of water. The ALB’s crew saw and headed towards a white flashing light, which was attached to Louisa’s uninflated liferaft. At 0424, near to the liferaft, the ALB crew found the skipper and Chistopher Morrison, both unresponsive and face down in the water. While recovering the casualties, the skipper’s body slipped from his lifejacket and was lost. Christopher was recovered from the water but was later declared deceased caused by drowning. After a further 30 minutes of searching, the lifeboat’s crew saw another light to the north of the bay. This light was attached to the lifejacket of a surviving crewman who had swum ashore and was clinging to the rocks. The ALB despatched its tender and landed a crew member on the rocks to provide warm clothing to the survivor. The ALB then continued searching and used its tender to recover Martin Johnstone, who was unresponsive and face down in the water, approximately 50m from the shore. Martin was later declared deceased caused by drowning At 0425, R948 reported that it would be on scene at 0510. By 0539, R948 had recovered the surviving crewman from the rocks. The survivor confirmed that there had been four persons on Louisa, all of whom were now accounted for. The skipper’s body remains missing. 1.4 CREW The skipper, Paul Alliston, was 42 years old. He had been associated with Louisa since build, initially as crew, and had taken over as skipper approximately 6 years before the accident. He held a Seafish2 Under 16.5m Skipper Certificate (unrestricted), which included both bridge and engine room watchkeeping certificates and Intermediate Stability Awareness. He had also completed the mandatory basic safety training courses. Martin Johnstone was 29 years old. As well as working as a fisherman he had served in the UK military. Of the mandatory basic safety training courses, he had completed Basic Fire-fighting and Prevention, Basic First-aid, and Safety Awareness and Risk Assessment courses, but not the required Basic Sea Survival course. He had undertaken the Basic Offshore Safety Induction and Emergency Training (BOSIET) course when looking for work in the offshore industry, but this was not recognised as an equivalent to the Basic Sea Survival course. Christopher Morrison was 27 years old. An experienced fisherman and a regular member of Louisa’s crew, he had completed all the mandatory basic safety training courses. 1 The Integrated Maritime Data Environment (IMDatE) is a technical framework that collects and combines data from EMSA’s maritime applications and other external sources to provide a comprehensive and configurable service to users. It supports the relay of data from Vessel Monitoring Systems (VMS) and Satellite AIS between maritime applications. 2 Seafish is an executive non-departmental public body, sponsored by the Department for the Environment, Food and Rural Affairs.
9 The fourth and only surviving crew member was 27 years old. He was an experienced crab fisherman and regular member of Louisa’s crew. He had completed the mandatory basic safety training courses and was the only member of the crew to have completed the 1-day Basic Health and Safety course.3 Louisa’s skipper and crew were share fishermen, which meant that they were not employed under a contract of service and, instead, received a share of the vessel’s profits as remuneration. 1.5 VESSEL AND OPERATION 1.5.1 Vessel description Louisa was built for static gear creel fishing and was designed with a vivier system to keep the catch alive (Figure 3). As required under Merchant Shipping Notice (MSN) 1813 (F), The Fishing Vessels Code of Practice for the Safety of Small Fishing Vessels, Louisa was built in accordance with the Seafish Construction Standards for new fishing vessels less than 15m length overall. Prior to registration, the vessel was subject to a Maritime and Coastguard Agency (MCA) inspection of safety equipment and crew qualifications. This inspection was required to be repeated every 5 years, with the vessel’s owners completing annual self-certification of compliance in the intervening years. As recommended by MSN 1813 (F), a freeboard and stability information booklet was produced for Louisa by the vessel’s designer following a lightship inclining experiment. The booklet contained a section entitled ‘Working Instruction’ in which the following was stated: ‘The accumulation of free water in the hold must be avoided as this will cause loss of stability due to its transverse movement. Non-watertight pound divisions will not effectively prevent this. Check bilge levels frequently and pump out as necessary, the functioning of the hold bilge alarm should also be verified at the start of each trip.’ [sic] Louisa’s normal operating pattern was broadly consistent with the voyage cycle assumption in the freeboard and stability information booklet, which assumed a ½ day voyage between departure port and fishing grounds, 5 days on the fishing grounds and a further ½ day return voyage from the fishing grounds to arrival port. 3 Following the discovery that many experienced fishermen who joined the UK fishing industry after 1 January 2005 had not completed the mandatory Basic Health and Safety course, the MCA decided that:
‘Fishermen who joined a UK fishing vessel for the first time after 1 January 2005 and before to 1 June 2014 and did not undertake the Basic Health and Safety course do not have to complete this course provided that they;
a) have completed the Safety Awareness and Risk Assessment course and
b) can demonstrate the date of joining a UK vessel prior to 2014 to the satisfaction of an MCA surveyor.
Fishermen who joined a UK fishing vessel for the first time after 1 June 2014 and did not undertake the UK Basic Health and Safety course must complete this course within a time specified by an MCA surveyor. This applies regardless of whether the fisherman holds the Safety Awareness and Risk Assessment Course.’
10 The booklet required that the vivier tank remained full with the water level pressed up the access trunk to the overflows. It stated: ‘If the water level dropped, a large free surface would develop and the vessel’s stability would be dangerously reduced.’ 1.5.2 Vivier system The purpose of a vivier system is to keep the vessel’s catch alive once removed from its natural environment, as the quality of shellfish degrades rapidly after death. To achieve this, circulation pumps maintain a steady flow of clean, aerated sea water throughout the system. On Louisa, the vivier system consisted of a tank with a capacity of 22t located in the centre of the vessel. The tank boundaries comprised the forward bulkhead of the engine room, the aft bulkhead of the forward hold and the vessel’s sides up to the level of the bait locker decks. A trunking led from the top of the vivier tank to finish flush with the main deck. Within the trunking were port and starboard overflow pipes. In the bottom of the vivier tank was a grid of perforated pipes through which the sea water was pumped by one of two dedicated pumps. Both pumps were non-self- priming and had a capacity of 125t/hr at 1,500rpm. The port pump was powered by an electric motor and the starboard by a hydraulic motor. The electric pump was rarely used as it generated excessive noise and vibration. The starboard pump was driven via a power take off from either the main engine (when at sea) or the Figure 3: Louisa - working deck Catch chute Hold hatch cover Vivier tank hatch Pound boards Discard chute
11 starboard auxiliary engine (when in port or at anchor). The deck wash pump could also be configured to feed the vivier tank, at a reduced throughput of approximately 35t/hr. 1.5.3 Engine room The engine room was located aft of amidships and forward of the accommodation. It was accessed via a door from the accommodation. The main engine produced 230kW at 2,000rpm and turned the vessel’s propeller through a gearbox, which incorporated a slipping clutch. This arrangement could be used in conjunction with the throttle to control ahead and astern propulsion. At the forward end of the engine, driven from the crankshaft, were power take offs to provide hydraulic power for the steering gear and the vivier system’s main pump. The engine room contained two auxiliary engines to provide electrical power for the vessel. The starboard auxiliary provided 45kVA at 1,500rpm and had a power take off to drive the hydraulic vivier system pump when the main engine was shut down. A smaller air-cooled engine had been retrofitted to Louisa by the owners to provide a level of redundancy. However, this was out of commission at the time of the accident and was planned to be replaced in May 2016. Also in the engine room was a general service pump (known on board as the deck wash pump), which could be configured to pump the bilges, supply the deck wash hose or supply the vivier system. The pump was powered by an electric motor and had a capacity of 35t/hr at 2,900rpm. 1.5.4 Bilge system As required by MSN 1813 (F), Louisa was equipped with a bilge pump and a bilge level alarm, with sensors (float switches) in the hold and engine room to provide warning to the crew when working inside or outside the wheelhouse. The general service pump could pump water from the engine room and/or the hold via fixed pipelines running to dedicated bilge wells in each of these compartments. In addition to the general service pump, the owners had fitted stand-alone electric bilge pumps in both the engine room and hold bilge wells. The bilge alarm float switches in the hold and engine room bilge wells were connected to an audible/visual alarm panel in the wheelhouse. Following a previous pipe failure, which had resulted in the engine room flooding, the owners had fitted a remote alarm sounder in the crew cabin to alert the skipper and crew that the bilge alarm had activated in the event the wheelhouse was unmanned. During the investigation, the alarm sounder in the crew cabin was found to have been disabled. It was reported that small quantities of melt water from the refrigerated bait storage lockers routinely collected in the hold bilge well, which caused the hold bilge alarm to sound when the vessel rolled. The alarm sounder in the crew cabin had regularly disturbed the skipper and crew, and consequently they had disabled it.
12 1.5.5 Hold and fore peak The hold was located forward of the vivier tank. Incorporated within the hold were two refrigerated bait storage lockers: one on the port side and one on the starboard side outboard of the vivier tank trunk. The lockers could each hold approximately 2t of bait and were accessed via insulated, but not watertight, doors in the hold. The hold was used for general storage of ropes and other spares and also included a small domestic chest freezer. The fore peak was located forward of the hold and included the bulbous bow. Although separate compartments, the fore peak and hold were interconnected by way of a small (30mm diameter) drainage hole located in the bilge. 1.5.6 Accommodation The accommodation comprised a galley/mess room and a single berth skipper’s cabin at main deck level, and a four-berth cabin for the crew on the deck below the galley and aft of the engine room. The designated skipper’s cabin on the main deck was only used for storage; the skipper and crew all slept in the lower four-berth cabin. The vessel’s hydraulic steering gear was located in the four-berth cabin, which also contained a fire detector/alarm and a bilge alarm sounder (that had been disabled, see 1.5.4). 1.6 WRECK RECOVERY To ascertain the cause of Louisa foundering, the wreck was salvaged and placed ashore in a secure facility to allow a thorough examination. A pre-salvage dive survey found no evidence of damage or breaches to the hull; that all visible doors and hatches were open; and that those freeing ports that could be seen were clear. The divers observed through the wheelhouse windows that the main engine controls were set with the propeller engaged and set to run astern at apparently low speed. After large amounts of loose rope had been cleared from around the vessel, lifting slings were placed beneath the vessel’s hull and it was lifted onto a crane barge. The wreck was then secured to the barge and transported to a facility on the River Clyde, where it was prepared for inspection (Figure 4). Extensive cleaning of the vessel was required to remove the remnants of the catch (approximately 4t of dead shellfish) and other detritus to make it safe for access.
13 1.7 VESSEL EXAMINATION 1.7.1 Vessel status The initial focus of the examination centred on checking and recording the positions of all system valves and machinery controls. As identified during the dive survey, the main engine controls were found set to run at apparently low speed with the propeller engaged astern (Figure 5). The vivier system valves and power supply were configured to operate the system using the main hydraulic pump driven from the main engine power take off (Figure 6). The status of the deck wash pump could not be ascertained because the switching arrangement provided no means for confirming whether or not the pump was being electrically powered at the time of the accident. However, the lock stop had not been activated, indicating that the pump was probably running. All machinery space and accommodation doors were found open. The hold hatch cover was found closed but not secured, and some lengths of rope were between the hatch cover and its coaming. It was reported that, prior to the accident, the hatch cover was open and secured against pound boards located forward of the hatch coaming, and that a number of bait boxes were stacked aft of the hatch coaming. It was not possible to check this information as the pound boards had become detached during the foundering and the bait boxes had moved. Figure 4: Louisa - transporting to River Clyde
14 1.7.2 Hull and structure integrity There was no evidence of external damage to Louisa’s hull and structure. To test its integrity, the vivier system’s inlet and outlet valves were closed and the tank was filled to the level of the overflow pipes in the trunking. Tank boundaries and pipelines were examined for signs of leakage. No leakage was observed and the water level remained constant. The vivier tank was then emptied and the hold filled. Hold boundaries (which included the engine room) and pipe runs were examined, but again no leakage was observed. It was noted at this stage that the fore peak filled at the same time as the hold, and this subsequently led to the discovery of the drainage hole between the two compartments. The vivier overflow pipes and the discard chute ran through sections of the hold. The overflow pipes and discard chute were blanked off at their hull outlets and filled with water, but again no leakage into the hold was observed. 1.7.3 Pipe systems To test Louisa’s piping, connection boxes were welded over the sea water inlets on the vessel’s hull and the systems were tested under pressure using a portable pump. The systems tested included: ● ●Bilge system (engine room and hold) ● ●Engine and generator cooling system Figure 5: Louisa - engine controls as found Ahead Astern Throttle/gearbox control Winch control (unused) Slipping clutch
15 ● ●Refrigeration condenser ● ●Vivier system ● ●Deck wash line ● ●Redundant prawn wash line. All systems were confirmed as being intact, with no leakage noted. Sea suction Discharge Bilge suction Hold bilge Prawn wash line shut shut shut open open open open shut shut shut Sea suction open shut open Sea suction shut open Deck wash pump Hydraulic Viver Pump Engine Room Vivier tank Hold N/R ER Bilge Deck wash line (open) Seized Vivier Discharge Manifold N/R shut Electric Vivier pump shut Deck wash pump suction manifold Overboard discharge Overboard discharge Valve Pump Figure 6: System drawing (valves as found)
16 1.7.4 Refloating Once all testing had been completed, Louisa was craned back into the water and the vivier tank refilled to replicate as far as possible the vessel’s condition at the time of the accident. The vessel was left floating for approximately 4 hours, remaining in a stable condition with no ingress of water, before being lifted ashore once more. 1.8 MODELLING OF FOUNDERING SCENARIOS 1.8.1 General A Wolfson HST computer model was used to explore the likely flooding scenarios that could have led to Louisa’s foundering. The model included the hull, tanks and watertight bulkheads. The fore peak was assumed to be part of the hold as they were connected via a 30mm diameter pipe. The forward section of sheltered deck space was also modelled to allow flooding on deck to be simulated. Hatch openings and freeing ports were included as warning points in the model to establish when they became submerged. The loading of the vessel at the time of loss was estimated from information derived from interviews and from the vessel’s freeboard and stability information booklet. Table 1 shows the loading condition assumed at the time of loss. Item Quantity (t) Notes Fuel tanks (port and starboard) 2.7 in each 85% full, not cross connected Daily service fuel tank 0.227 Full Vivier tank 22.87 Full (any catch would displace water so no net effect) Fresh water tank 1.68 80% full Bait and boxes 2.0 As per freeboard and stability booklet Crew (4) 0.3 Stores 0.5 As per freeboard and stability booklet Table 1: Loss condition estimated loading 1.8.2 Engine room flooding Given the most likely sources of internal flooding were within Louisa’s engine room, flooding of that space was modelled first. With the engine room free to flood, the model remained afloat with a small stability margin and with a stern trim.
17 1.8.3 Hold flooding With 35t of flood water in the hold, which equated to 60% of the compartment’s volume, the model became heavily trimmed by the bow with negligible stability remaining. There was still positive freeboard forward and no downflooding points were submerged. 1.8.4 Hold flooding in combination with water on deck The effect of water on deck was explored. However, for water to collect on the main deck, the vessel required a significant bow trim (of 0.5m between the draught marks) to prevent the forward-most freeing ports from shedding water overboard. Louisa normally operated with a stern trim. It was estimated that to achieve such a bow trim required 15t of water in the hold. A further 5t of water, equating to a depth of 0.5m, was then required on the main deck for the model’s stability to become marginal. Consideration was given to whether the propeller driving slowly astern while Louisa was at anchor would induce sufficient bow trim to allow water to collect on the main deck. Approximate calculations indicated a bow trim of 0.07m might result from the propeller driving astern with the main engine idling. Considering that a trim change of over 1m was required to cause water to collect forward, the probability of this effect was considered to be negligible. 1.9 LIFESAVING APPLIANCES 1.9.1 Lifesaving appliances carried on board Louisa Louisa was equipped with the following lifesaving appliances: ● ●1 Oceanic 8, Lifeguard marine liferaft ● ●5 Cosalt Premier (32kg or more) solid-filled lifejackets ● ●1 McMurdo Smartfind 406MHz EPIRB ● ●5 Mullion Compact 150N personal flotation devices (PFDs). The Mullion PFDs had been issued free of charge by the Scottish Fishermen’s Federation (SFF) under the Personal Flotation Device (PFD) initiative supported by the European Fisheries Fund (EFF). The PFDs were designed for use by fishermen in the working environment and aimed to combat the ongoing loss of life through crew falling overboard during normal fishing operations. The PFDs supplied to the crew of Louisa had remained in their original packaging, were stored in the skipper’s cabin, and were out of date for their required annual servicing. 1.9.2 Liferaft MSN 1813 (F) required Louisa’s owners to ensure that safety equipment carried on board the vessel was suitably maintained and serviced in accordance with manufacturers’ instructions. Louisa was required to carry a liferaft, and the Code
18 recommended it should either be float free or fitted with a Hydrostatic Release Unit (HRU). Marine Guidance Note (MGN) 499 (M+F)4, required the liferaft to be serviced at least annually at a service station accredited by the manufacturer. Louisa’s Oceanic 8, Lifeguard marine liferaft had been manufactured in 1990 to Offshore Racing Council (ORC) standards5. The liferaft was located on the wheelhouse roof and secured in a cradle, incorporating an HRU. The HRU was designed to release the liferaft from its cradle if the unit was submerged to a depth of between 2m and 4m. Louisa’s owners had hired the liferaft from Premium Liferaft Services on a 3-year contract that had commenced on 23 April 2014. The hire contract allowed for the liferaft to be replaced annually to meet the servicing requirements. The last recorded service of the liferaft was on 7 March 2014, just prior to the beginning of the contract. Furthermore, at the time of the accident, Premium Liferaft Services’ accreditation from the manufacturer to service this brand of liferaft had lapsed despite the company’s efforts to secure continuation training for its technicians. 1.9.3 Post-accident inspections of the HRU and liferaft During examination of the recovered vessel, MAIB inspectors noted that the HRU had an expiry date of March 2015, and it had not been rigged correctly. The liferaft’s painter, which should have been secured via a weak link (designed to part once the liferaft had inflated) had been tied directly to the cradle. In the event, these shortfalls were immaterial because the crew had deployed the liferaft manually before the vessel foundered; however, it had failed to inflate. Following the accident, the uninflated liferaft was recovered to Barra police station, where MAIB investigators conducted an initial inspection (Figure 7). Subsequent inspections of the liferaft were carried out by an independent liferaft servicing company and by the current manufacturing representatives of Lifeguard products. The findings of these examinations were that: ● ●The liferaft inflated successfully when subjected to a gas inflation test. ● ●The liferaft’s condition indicated that it was suitable for use and that its condition was commensurate with its age. 1.9.4 Testing and examination of the CO2 inflation cylinder Inspection of the CO2 inflation cylinder noted that it was devoid of gas but contained approximately 1.5 litres of water. Examination of the CO2 cylinder at an independent test facility (Annex A), including dye penetrant testing, revealed surface cracks in the valve attachment threads at the neck of the cylinder. Laboratory analysis of the water (Annex B) highlighted a high saline content indicating that this was likely to have been seawater. 4 MGN 499 (M+F) Life Saving Appliances: Inflatable Liferafts, Marine Evacuation Systems, Inflatable Lifejackets and Hydrostatic Release Units – Servicing Requirements, has now been replaced by MGN 553 (M+F) for non- SOLAS inflatable LSA. 5 ORC liferafts were introduced, following the 1979 Fastnet Race, by the Offshore Racing Council (ORC) for yachts racing under its rules. The Sydney Hobart Race in 1998 brought the durability of these liferafts into question and led to a revision of the standard. ORC liferafts are being phased out by the MCA in accordance with MGN 553 (M+F).
19 Examination of the valve assembly showed that the operating mechanism had been correctly activated. Further examination indicated that the valve assembly had not been tightened into the cylinder to the manufacturer’s recommended torque setting. In November 2011, Premium Liferaft Services had sub-contracted refurbishment of the cylinder to Thameside Fire Protection Company Limited. The cylinder was one of a batch of nine cylinders that had been sent for 5-yearly refurbishment and refilling. The process included cleaning, inspection, pressure testing, painting and refilling of the cylinders. Prior to filling, the shoulder of the cylinder was date-stamped to indicate that pressure testing had taken place. A label was adhered to the cylinder showing its tare weight6, gas charge (CO2 and N2) and full weight, which was 8.40kg (Figure 8). When the cylinder was weighed following the accident, its tare weight was 8.40kg. It was therefore concluded that, following refurbishment in 2011, the cylinder had not been refilled prior to its return to Premium Liferaft Services. Following this discovery, MAIB inspectors arranged for the remaining eight cylinders from the batch of nine to be recalled and weighed. All were found to have been correctly filled and labelled. One of the recalled cylinders of a similar type to that of Louisa’s cylinder is shown in Figure 9. 1.9.5 Lifejackets – regulatory requirements MSN 1813 (F) required small fishing vessels to carry an abandonment lifejacket for each person on board. The lifejackets were required either to be of the solid-filled type, or should have had automatic gas inflation and at least 150N buoyancy. SOLAS requires that the in-water performance of a lifejacket be evaluated in compliance with the recommendations of the International Maritime Organization (IMO). The IMO’s recommendations on testing lifesaving appliances are set out in 6 Tare weight = the weight of the cylinder plus valve assembly (some companies also include label weight) measured before adding the gas charge. The gas charge is a mixture of carbon dioxide (CO2) and Nitrogen (N2) which is added by weight. Figure 7: Liferaft at Barra police station CO2 cylinder Activation head
20 resolution A.689(17) and, for lifesaving appliances installed on board on or after 1 July 1999, in resolution MSC.81(70) (Revised recommendation on testing of life-saving appliances). Recommendations for lifejacket water performance tests, set out in both A.689(17) and MSC.81(70), are reproduced in Annex C. Figure 8: CO2 cylinder as found TARE WEIGHT 5.550 kg CARBON DIOXIDE 2.780 kg NITROGEN 0.070 kg FULL WEIGHT 8.400 kg Figure 9: Recalled CO2 cylinder of a similar type to that of Louisa’s cylinder TARE WEIGHT 8.360 kg CARBON DIOXIDE 2.780 kg NITROGEN 0.070 kg FULL WEIGHT 11.210 kg
21 The water performance tests were intended to determine the lifejacket’s ability to assist a helpless person or one in an exhausted or unconscious state, and to show that the lifejacket did not unduly restrict movement. The test regime required able-bodied test subjects who were all good swimmers and collectively met prescribed selection criteria in terms of gender, height and weight. Recognizing a need to introduce more precise provisions, the IMO adopted amendments to the revised recommendation on testing of lifesaving appliances on 13 May 2005 in resolution MSC.200(80). The amended recommendations for lifejacket water performance tests, set out in MSC.200(80), are reproduced in Annex D. Further amendments were introduced by resolution MSC.378(93) on 22 May 2014, reproduced in Annex E. MSC.200(80) introduced a requirement for the in-water performance of a lifejacket to be evaluated by comparing its performance with that of a Reference Test Device (RTD)7. The design and construction requirements for an RTD were amended by resolutions MSC.226(82) and MSC.378(93), reproduced in Annex F. The test standards are not absolute and incorporate a risk-based approach, particularly in respect of the water performance righting tests. In both A.689(17) and MSC.200(80), donning tests require that test subjects carry out initial tests wearing normal clothing and then a further test wearing heavy-weather clothing. However, water performance tests are carried out in fresh water under still conditions, with the test subjects wearing only swimming costumes. Resolution A.689(17) section 2.9.8 states: ‘When evaluating the results of a test in accordance with 2.9.5, 2.9.7 and 2.9.8, the Administration may, in exceptional circumstances, disregard the results of a test on a subject if the results show a very slight deviation from the specified criteria, provided the Administration is satisfied that the deviation can be attributed to the unusual size and stature characteristics of the test subject and the results of tests on other subjects, chosen in accordance with 2.9.2, show satisfactory performance of the lifejacket.’ MSC.200(80) defines the requirements for test subjects (Annex D Table 2.1) and requires a minimum of 12 test subjects. Each subject is required to complete the righting test six times using the lifejacket and six times using the RTD. The period of time taken for the test subject’s mouth to come clear of the water is measured to the nearest 1/10th second, and the highest and lowest times recorded against each device are discarded. MSC.200(80) goes on to state the following relating to the water performance test results: ‘2.8.7 After the water tests described in 2.8.5 and.6 above: .1 Turning time: The average turn time for all subjects in the candidate lifejacket should not exceed the average time in the RTD, and the number of ‘no-turns’, if any, should not exceed the number in the RTD; .2 Freeboard: The average freeboard of all the subjects should not be less than the average for the RTD; 7 An RTD is a lifejacket manufactured to a specification as detailed in Annex F.
22 .3 Torso angles: The average of all subjects’ torso angles should not be less that the average for the RTD minus 5º; .4 Faceplane (head) angles: The average of all subjects’ faceplane angles should be not less than the average for the RTD minus 5º; .5 Lifejacket light location: The position of the lifejacket light should permit it to be visible over as great a segment of the upper hemisphere as is practicable.’ MSC.378(93) was developed following an IMO sub-committee investigation into inconsistencies in the performance of prototype lifejackets against the RTD. The revised criteria relaxed the performance criteria against the RTD, allowing a lifejacket to turn in 1s longer than the average time of the RTD and a reduction in the required freeboard height, and faceplane and torso angles. 1.9.6 Approval process for novel lifesaving appliances Before giving approval to a novel lifesaving appliance or arrangement, SOLAS requires an Administration to ensure that such appliances provide safety standards at least equivalent to the requirements of SOLAS and the Life Saving Appliance (LSA) Code and that they have been evaluated and tested based on the guidelines developed by the IMO in resolution A.520(13). The following is an extract: ‘3.1.2 Individual buoyancy equipment should: .8 in calm fresh water, be capable of lifting the mouth of a completely relaxed person wearing normal clothing at least 120 mm clear of the water; .9 in calm fresh water, be capable of turning a completely relaxed person wearing normal clothing from any position in the water to one where the mouth is clear of the water within 5 s…’ 1.9.7 Approval of the Cosalt Premier (32kg or more) solid-filled lifejacket Louisa was equipped with Cosalt Premier (32kg or more) solid-filled lifejackets, which the skipper and crew all donned before abandoning the vessel (Figure 10). These lifejackets were marked ‘LLOYDS REGISTER APPROVED, AUTHORISED BY MCA’8 and were of a type commonly used on passenger ships, other commercial vessels and leisure craft. The lifejacket type was tested against A.689(17) by the Department of Transport’s Newcastle Marine Office in April 1992 (Annex I). The water performance tests included a requirement for a minimum of six test subjects to complete three gentle swimming strokes, then to simulate a state of utter exhaustion with their heads down and lungs partially filled. The time from the last stroke until the mouth became clear was then noted. The time was not to exceed 5s. The test was then repeated after the subject had exhaled and, again, the time was not to exceed 5s. 8 Lloyd’s Register was authorised by the MCA to certify and approve lifejackets against IMO requirements. The MCA was not involved in testing or authorising individual products.
23 During the first test, four of the eight test subjects exceeded 5s (albeit by up to only 0.5s) and, after exhalation, two of the eight test subjects exceeded 5s (by less than 1s). These tests were then repeated by the Newcastle Marine Office in May 1992 (Annex I) using the same eight test subjects, at which time all the test subjects’ airways were clear of the water within 5s during both tests. There is no indication in either of these test reports of any modifications or improvements having been carried out to the lifejacket. Following its initial approval, the lifejacket type underwent a number of modifications relating to material specifications, each of which resulted in partial retesting of the lifejackets. The version of the lifejacket type on board Louisa was issued a ‘Certificate of Type Approval’ (included at Annex I) by Lloyd’s Register on 6 May 2004 valid until 5 May
- The certificate and the accompanying ‘EC Type Examination (Module B)
Certificate’ did not reference any further water performance tests and referred only to material and buoyancy tests carried out by AMTEC Laboratory and Fleetwood Testing Laboratory between 1998 and 1999 (Annex I). The lifejacket type ceased production in 2010 and was replaced by the Cosalt Premier 2010, which was designed to meet the requirements of MSC.200(80). Figure 10: Lifejackets at Barra police station
24 1.9.8 MAIB lifejacket trials and subsequent testing In view of the RNLI reports relating to the discovery and recovery of the casualties, the MAIB undertook trials of one of the recovered Cosalt Premier (32kg or more) lifejackets and a similar and widely available solid-filled approved lifejacket, which had been produced by another manufacturer in 2014 and tested against the requirements of MSC.200(80). Also tested was a PFD of the same make and design as those available but unused on Louisa. The trials used only two subjects and only loosely resembled the test protocols contained in MSC.200(80). However, they closely matched the requirements of A.689(17). Both test subjects were approximately 176cm tall, one weighing 66kg and the other 104kg. Each subject trialled both of the solid-filled lifejackets. During the righting tests neither lifejacket was able to turn either test subject, leaving them floating face down in the water until they were forced to abort the test to take breath (in excess of 20s) (Figure 11). The inflatable PFD righted a face down test subject within 2s on each occasion. Following liaison between the MAIB and the MCA, the Cosalt Premier (32kg or more) solid-filled lifejacket used in the MAIB trials was transferred to the MCA for further testing. These tests were carried out by an approved testing organisation and included the testing of an additional Cosalt Premier (32kg or more) solid-filled lifejacket. The test protocols used were in accordance with MSC.81 (70). Both lifejackets failed to meet the required test standard. The MCA also commissioned Figure 11: MAIB lifejacket trials
25 the testing of a similar, widely available solid-filled approved lifejacket against the requirements of MSC.200 (80). This lifejacket also failed to meet the required test standard. 1.9.9 Emergency position indicating radio beacon MSN 1813(F) recommends that small fishing vessels are equipped with an EPIRB. Louisa’s McMurdo Smartfind 406MHz EPIRB, which was fitted in a float-free housing on the wheelhouse roof, was designed to provide both alerting and location functions. Louisa’s EPIRB was manually activated by the crew and functioned correctly despite the battery having an expiry date of March 2016 and, therefore, being overdue for replacement (Figure 12). 1.10 SEARCH AND RESCUE 1.10.1 EPIRB description An EPIRB is a distress alerting device that, once activated, transmits a 406MHz digitally encoded radio message at a power of 5 Watts for a ‘burst’ duration of approximately 0.5s. Transmissions are repeated once every 50s until the beacon’s battery is exhausted. EPIRB transmissions contain information relating to the country in which the beacon is registered and the identification of the vessel in distress. EPIRBs can be an alert only type or GNSS encoded to provide a location function. Positional information for alert only (non GNSS) EPIRBs is obtained through Doppler processing9 by the local user terminals (LUTs) and requires a minimum of 3 data points from the EPIRB transmissions. GNSS enabled EPIRBs also transmit their position. The standard location protocol for a GNSS enabled EPIRB refers to coarse and refined position accuracy. For UK SAR purposes, a coarse position is assumed to have a maximum error of 15nm assuming that the GNSS position is accurate. A refined position is accurate to within 120m. The EPIRB’s transmission is arranged in two protected data fields: the first protected data field (PDF-1) contains the beacon’s identification information and its ‘coarse’ position; the second protected data field (PDF-2) contains a correction to the beacon’s coarse position to produce a ‘refined’ position. PDF-1 contains the maximum level of protection from signal interference and is received in the initial transmission. 9 Prior to the introduction of GNSS enabled beacons, the Cospas-Sarsat system made location of the beacons possible by Doppler processing. LUTs detecting non-GEOSAR satellites interpret the Doppler frequency shift heard by LEOSAR satellites as they pass over a beacon transmitting at a fixed frequency. The interpretation determines both bearing and range. The bearing and range are measured from the rate of change of the heard frequency, which varies both according to the path of the satellite in space and the rotation of the Earth. This triangulates the position of the beacon. A faster change in the Doppler indicates that the beacon is closer to the satellites orbit. If the beacon is moving toward or away from the satellite track due to the Earth’s rotation, it is on one side or other of the satellite’s path. Doppler shift is zero at the closest point of approach between the beacon and the orbit.
26 Battery expiry date MAR 2016 Figure 12: Louisa EPIRB
27 1.10.2 Cospas-Sarsat system description The Cospas-Sarsat system consists of LEOSAR satellites at an altitude of 850km and GEOSAR satellites at between 19,000 and 24,000km altitude. Both types of satellite detect transmissions from EPIRBs, Emergency Locator Beacons, and Personal Locator Beacons, and transmit data received from these to LUTs. LUTs process the data to identify and locate a beacon and its corresponding mission control centre (MCC), to whom the data is forwarded. The MCC then provides the distress alert information to the appropriate SAR service (Figure 13). The Cospas-Sarsat system was initially designed to work with LEOSAR satellites which provide both independent location of beacons by Doppler processing and GNSS reception of encoded beacons. Subsequently, the alerting function was incorporated into GEOSAR satellites to improve system coverage both for the Figure 13: Cospas-Sarsat system diagram
28 alerting function for all beacons and the location capability for GNSS encoded beacons. Expansion of the system to include GEOSAR satellites has improved system coverage for encoded location and enhanced initial alert timeliness. 1.10.3 Terminology In addition to coarse and refined positions, the following terminology relevant to this accident is used by operators dealing with Cospas-Sarsat beacon detections: The GEOLUT passes the alert to the beacon’s host MCC as soon as it has a confirmed message (valid message with complete PDF-1 field). It will also transmit unconfirmed messages if confirmation has not been achieved within 5 minutes. The GEOLUT will also pass updated information to the MCC as the encoded position in the beacon’s transmitted alert message changes (refined position). An EPIRB alert is categorised in terms of its type and location. The alert type is undetermined until it is confirmed as being real or false. Where a satellite is unable to detect the EPIRB’s location, the alert is detect only. This can be a non GNSS EPIRB detected by a GEOSAR or by a LEOSAR with insufficient data points. An unresolved location means that a LEOSAR satellite has detected the EPIRB’s location using Doppler processing, producing two possible positions: one true and one false. A resolved location means that a second satellite pass has validated one of the possible positions as being the EPIRB’s true position. 1.10.4 UK EPIRB response In the UK, the response to a UK EPIRB was managed by two separate organisations: UKMCC and HMCG. UKMCC was manned by RAF personnel and based in Scotland at RAF Kinloss. Distress alerts are initially received by UKMCC through the Cospas-Sarsat system. Alerts from EPIRBs (and all other alerts over water) are then passed to HMCG, who co-ordinate the SAR response. HMCG’s point of contact for EPIRB alerts has traditionally been CGOC Falmouth, but this is now shared with the National Maritime Operations Centre (NMOC). HMCG’s standard operating procedure for satellite distress beacon alerts is reproduced in Annex G. On receipt of a beacon alert, UKMCC first checks that it is a new alert and not additional data relating to a previous or ongoing beacon activation. When a new EPIRB alert is received, UKMCC passes the information directly to HMCG by telephone and fax, and by initiating a new incident on the Vision 4 system. UKMCC and HMCG check the EPIRB registration on the Consolidated European Reporting System (CERS) database for information relating to the vessel’s name, its operation and emergency contact details. Both HMCG and UKMCC can update the live feed on the Vision 4 system.
29 Once the registration details have been recovered, HMCG attempts to contact the vessel and/or its owners through the emergency contact details listed in the CERS database. Attempts are also made to confirm the vessel’s normal area of operation. Once the EPIRB’s location has been confirmed, co-ordination of the incident is passed to the relevant CGOC. Louisa’s EPIRB initial alert type was categorised by UKMCC as undetermined and its location as unresolved. Subsequently, UKMCC referred to the EPIRB’s updated location as a refined position. The position descriptors of coarse and refined, associated with GNSS enabled EPIRBs, do not feature in HMCG’s standard operating procedure for satellite distress beacon alerts. 1.10.5 HMCG operational manning HMCG has a network of 10 area CGOCs and one NMOC. The NMOC is both an operation centre in its own right and the co-ordinator of operational activities across the network. Although the CGOCs have the ability to function autonomously, the system is designed to operate as a network with each CGOC receiving support from within the network to meet its operational needs. A duty controller monitors activity levels across the network and matches the available resource to meet operational demands. The role of the duty controller expands to monitor the progress of ongoing operations and to assist, or to direct other operators to assist, as the situation develops. The duty controller is nominally based at NMOC, but could operate from any of the CGOCs. Whenever practicable, SAR activity is co-ordinated by the CGOC within whose geographical area the incident has occurred. During the CG response to the foundering of Louisa there were 25 officers manning the network. Four officers (including a trainee controller) were based at the NMOC. The CGOCs had a maximum of three officers on watch, though CGOC Aberdeen and CGOC London, each had only one officer on watch. The network had been the subject of a study by the Department for Transport’s In House Analytical Consultancy (IHAC) team, which determined that the minimum manning across the network should not drop below a total of 21 suitably qualified personnel. The network had only one duty controller covering the shift, who was based in CGOC Belfast and was on a break at the time of the alert and did not rejoin the network until 0427. His role was being covered by a trainee at NMOC who had been employed by HMCG for only 3 months. At the start of the night shift on 8 April, the duty controller had asked the senior maritime operations officer (SMOO) at CGOC Stornoway to provide SMOO cover for nine additional areas. There was a total of 10 SMOOs on duty across the network, but none located in the NMOC. CGOC Falmouth had two officers available. The SMOO was away from her post taking a scheduled meal break during the incident. CGOC Stornoway had two officers on watch, a SMOO and a trainee Maritime Operations Officer (MOO). Once CGOC Falmouth had received a refined position for Louisa’s EPIRB, co-ordination of the incident was passed to CGOC Stornoway. There, the SMOO and the trainee MOO attempted to deal with a wide range of tasks. These included requesting SAR support (ALB and aircraft), briefing the RNLI and ARCC, paging and tasking the ALB crew, and paging the aircraft crew. Additional workload was caused
30 by a number of system-related deficiencies. These included a fault with the UKMCC fax machine, which had been defective for a week, and an inability to automatically transfer EPIRB data into Vision 4, a condition that had been known for 18 months and which consequently required manual transfer of data that took several minutes. These deficiencies were compounded by faults with the Vision 4 system, which resulted in terminals freezing or shutting down. Additional communications problems included an inability of the ARCC to access the VHF radio paging system for helicopter crews, and known communications blackspots in the Barra area. 1.11 EFFECTS OF COLD WATER IMMERSION The human body’s typical reaction to immersion in cold water (under 15°C) is normally considered in four stages:
Cold water shock Cold water shock takes place within the first 30s to 2 minutes and is generally associated with a gasp reflex as the body comes into contact with the cold water, along with hyperventilation and a dramatic increase in heart rate and blood pressure. If the head goes underwater during this stage, the inability to hold one’s breath will often lead to water entering the lungs in sufficient quantities to cause death. The increased heart rate and blood pressure can result in cardiac arrest, especially if the casualty has an existing cardiovascular condition. Panic can cause the hyperventilation to continue even after the initial physiological effects have subsided.
Cold incapacitation Cold incapacitation usually occurs within 2-15 minutes of entering the water. The blood vessels are constricted as the body tries to preserve heat and protect the vital organs. This results in the blood flow to the extremities being restricted, causing cooling and consequent deterioration in the functioning of muscles and nerve ends. Useful movement is lost in the hands and feet, progressively leading to the incapacitation of arms and legs. Unless an effective lifejacket is worn, death by drowning occurs as a result of impaired swimming.
Hypothermia Hypothermia occurs when the human body’s core temperature drops below 35°C (it is normally about 37°C). Depending on circumstances, this can occur after 30 minutes. Symptoms of moderate hypothermia, when the body’s temperature is between 28-32°C, include inattention, confusion, difficulty moving and loss of coordination. Loss of consciousness is associated with severe hypothermia, when the body’s temperature is below 28°C. The body’s core temperature can continue to drop even after the casualty has been recovered from the water if the re-warming efforts are not effective.
31
Circum-rescue collapse Circum-rescue collapse can occur just before, during or after rescue due to a variety of mechanisms that result in unconsciousness or death. Collapse just before rescue may occur when a casualty relaxes mentally resulting, among other things, in a sudden drop of stress hormones, possibly leading to drop in blood pressure. 1.12 URGENCY OF RESPONSE The International Aeronautical and Maritime Search and Rescue (IAMSAR)10 manual states that in water at 10ºC, the 50% survival time for a normally-clothed individual is estimated to be about 2 hours, with a recommended search time of 12 hours. The manual recognises that there are many factors that can influence survival times, including the use of survival suits, lifejackets and liferafts, and the adverse effects of wind-chill, breaking waves and strong currents. It also notes that an individual’s level of fitness and body fat percentage can further influence survivability. 1.13 PREVIOUS/SIMILAR ACCIDENTS Aquila - 20 July 2009 Aquila was a 13.4m long scallop dredger, which capsized east of the Isle of Muck, off the west coast of Scotland, with the loss of three crew. The MAIB report11 concluded among other things that the speed of capsize resulted in the vessel’s liferaft and EPIRB becoming trapped in the superstructure. Therefore, although they had released from their stowage cradles, neither of these important safety items were able to operate as intended. The Maritime Rescue Co-ordination Centre (MRCC) Clyde, which initially received the distress call, immediately tasked a SAR helicopter. However, when it was realised that the accident had occurred outside MRCC Clyde’s area of operation, MRCC Clyde transferred co-ordination responsibility to MRCC Stornoway, in whose area the accident had occurred, and stood the helicopter down. The decision to transfer co-ordination of the incident and stand the helicopter down caused a delay of 23 minutes in a rescue helicopter reaching the accident site. The MCA committed to make arrangements to make ARCC the single tasking authority for SAR helicopters with effect from 1 April 2010 and to commence a review of: ● ●The exchange of information between MRCCs and ARCC when aircraft are tasked to an incident. ● ●The handover of live incidents between MRCCs. ● ●The selection of appropriate SAR assets regardless of MRCC boundaries. ● ●VHF radio procedures for managing SAR assets. 10 The IAMSAR manual is in three volumes and its purpose is to assist States in meeting their own SAR needs and their international obligations under SOLAS. 11 MAIB Report No 5/2010.
32 ● ●The VHF radio coverage in the area of the accident. In view of these commitments the MAIB did not make further recommendations. Ocean Way – 2 November 2014 The 17.07m fishing vessel Ocean Way (FR 349), a trawler with a crew of five, capsized and sank 100nm off the north-east coast of England. The MAIB report12 concluded that: although accurate positional information for the vessel became available, this was not initially recognised by the SAR authority due to its cognitive bias towards information that placed the vessel further inshore; it is important that procedures are followed to avoid essential information being overlooked when staff are engaged in demanding situations; the opportunity to task a rescue helicopter at an earlier stage of the incident was missed and; the efficient conduct of SAR missions would be more effective if all UK MRCCs were equipped with computer systems capable of gaining access to essential information from all available databases. The report also observed that the availability of contemporaneous Vessel Monitoring System (VMS) information to MRCCs would prove of great value in identifying, locating and assisting fishing vessels in distress. Had the vessel’s EPIRB been fitted with an integral GNSS it is probable that a helicopter would have been tasked about 50 minutes sooner. As a result of this incident, the MCA reported it had: ● ●Included a requirement that EPIRBs be equipped with GNSS in proposed new Codes of Practice for the safety of fishing vessels. ● ●Ensured that the computer equipment in all MRCCs was capable of accessing vessels’ positional information in a timely manner. ● ●Updated staff training provision to ensure appropriate consideration was given to the use of all resources when responding to requests for assistance. ● ●Reviewed its staff training in operational procedures to ensure the correct handover of incident co-ordination is followed in the future. The MAIB recommended13 that the MCA: ● ●Take action to ensure that the EPIRBs required to be carried on UK registered fishing vessels are equipped with integral GNSS receivers. Annie T - 4 October 2015 A crewman from the 9.15m creel fishing vessel Annie T (CY1) was carried overboard by the fishing gear when his foot became caught in a bight of rope while he was moving an end weight on the working deck. The skipper recovered the crewman back on board about 10 minutes later but was unable to resuscitate him. 12 MAIB Report No 23/2015. 13 Recommendation 2015/154.
33 The MAIB report14 concluded that: The accident occurred because the crewman was in an unsafe position and became entangled in a rope while shooting creels. Neither the skipper nor the crewman wore lifejackets during fishing although three new, unused, constant wear lifejackets were found on board the vessel following the accident. Neither the skipper nor crewman appreciated the effects of cold water shock and, as a consequence, had not taken precautions to mitigate these effects. The MCA was recommended15 to: Prioritise the introduction of legislation that will require the compulsory wearing of personal flotation devices on the working decks of all fishing vessels while at sea. Apollo – 18 April 2016 At 0630 on 18 April 2016, a crewman fell overboard from the stern of the 23.95m fishing vessel Apollo (INS 179) while the nets were being hauled. The weather was rough at the time of the accident and the crewman was not wearing a personal flotation device (PFD). An extensive search was carried out by coastguard helicopters, military aircraft and Apollo’s crew. The crewman’s body was found nearly 4 months later. The MAIB report16 found that following a previous fatal man overboard in 2007 the crew had been required to wear lifejackets. However, the practice had fallen into disuse and lifejackets had not been worn for several years despite constant wear lifejackets being available on board. It also identified that fishermen generally lack awareness of the debilitating effects of cold water immersion, specifically cold shock and cold incapacitation. The report considered similar manoverboard cases that have been reported to the MAIB since 2007. In the majority of these cases the person in the water was initially responsive and able to help themselves before they rapidly succumbed to the incapacitating effects of cold water. Harvester - 28 April 2016 The potter Harvester (M999) grounded on rocks in Abereiddy Bay, North Pembrokeshire, and sank a short time later. There was no indication of any crew on board at the time of the grounding. A large-scale SAR operation commenced and the body of a crew member was recovered from the water 3nm from where Harvester had foundered. He was wearing neither a lifejacket nor other buoyancy aid. The second crew member was not found despite an extensive search. The MAIB report17 concluded that neither crew member was wearing a PFD, significantly lowering their chances of survival. 14 MAIB Report No 21/2016. 15 Recommendation 2016/146. 16 MAIB Report No 23/2016. 17 MAIB Report No 22/2016.
34 The report also noted that a personal locator beacon is a very useful additional means of raising the alarm particularly, as in this case, if no one is left on board and the only other means of raising the alarm remains on the vessel. Harvester’s automatic identification system (AIS) unit was switched off at the time of the accident. An historical track of the vessel’s movements would have been particularly valuable to those involved in the initial search and rescue operation.
35 SECTION 2 - ANALYSIS 2.1 AIM The purpose of the analysis is to determine the contributory causes and circumstances of the accident as a basis for making recommendations to prevent similar accidents occurring in the future. 2.2 OVERVIEW Louisa sank by the bow and foundered while at anchor in Mingulay Bay. Following recovery and investigation of the wreck, it is concluded that the cause of the foundering was flooding of the hold. The skipper and crew had all gone to bed in the accommodation, and the hold bilge alarm failed to wake them because the alarm sounder in the crew cabin had previously been disabled. The events leading up to the flooding and the circumstances in which it occurred could not be conclusively determined, but water probably entered the hold from the deck wash hose. When abandoning the vessel, the crew attempted to launch the liferaft. However, the liferaft failed to inflate because its CO2 cylinder was empty, which resulted in the skipper and crew having to enter the water. Although they had all donned lifejackets, the skipper and two crew became unresponsive through cold water immersion and were later found face down in the water by the rescue services. Before abandoning Louisa, the crew activated the vessel’s EPIRB. Although UKMCC had received an initial alert by 0239, the first request for a SAR asset was not made by HMCG until 0322. Had the rescue services arrived on scene earlier, it is possible that there would have been more survivors. 2.3 VESSEL STATUS At the time of the accident, Louisa was at anchor approximately 200m from the shore in Mingulay Bay with the skipper and crew asleep in the accommodation. Post-accident examination of the vessel indicates at the time of the accident that: ● ●The main engine was running at apparently slow speed with the propeller engaged astern, and the vivier system hydraulic pump was being driven from the main engine power take off. ● ●All machinery space and accommodation doors were left open, and the hold hatch cover was secured in the open position. ● ●The deck wash pump had probably been left running (see section 2.5). While the skipper had been known, on occasion, to leave the engine running astern for short periods while moored alongside, such as when loading bait, it would be highly unusual to leave the engine driving the vessel astern when the vessel was at anchor, especially when the wheelhouse was unmanned. More normal would have been for the main engine to be shut down and the hydraulic vivier pump driven from the auxiliary engine. However, it is possible that although the main engine was left running to power the vivier pump, the propeller was only engaged astern by the
36 skipper in an attempt to overcome the rapidly increasing bow trim. Also, while not always the case, it would have been a routine task to shut down the general service (deck wash) pump before the crew took their rest. 2.4 FATIGUE Louisa’s crew had been fishing continually for 4 days, working approximately 20 hours per day. During that period they had not had any dedicated rest or meal breaks, they had mainly sustained themselves by eating snacks, and had slept when possible during the relatively short transits between each string of creels. Besides being short of sleep, the crew were physically exhausted by the work required to shoot and recover the strings of creels and to process the catch. Ultimately, the skipper had anchored the vessel because he considered both he and the crew were too tired to continue fishing safely. While the skipper’s decision to halt operations to enable the crew and himself to rest was wise, by then the crew were fatigued. The evidence indicates that they interrupted their work to eat a meal, and afterwards went straight to bed. The consequence of this was that the vessel’s machinery was not shut down / reconfigured appropriately, which created the conditions for the accident to occur. Further, because the bilge alarm sounder in the crew cabin had been disabled, the skipper and crew did not receive any early warning that the hold was flooding. Instead of managing work routines to prevent fatigue and so ensure adequate levels of safety were maintained, the skipper worked the crew and himself to a state of tiredness such that the safety of the vessel and its crew was compromised. The work ethic that resulted in this behaviour can be linked to the share remuneration scheme, which encouraged the skipper and crew to maximise the catch whenever suitable conditions provided. 2.5 VESSEL FOUNDERING There was no evidence that Louisa had suffered external damage, all hull and tank boundaries were intact, and seawater piping systems retained their integrity throughout post-accident system testing. Modelling of foundering scenarios showed that 35t of water in the hold would have heavily trimmed the vessel by the bow, with negligible stability remaining. Flooding the engine room would have caused the vessel to sit deeper in the water with a stern trim but would not have resulted in foundering. Therefore, flooding of the hold was considered to have been the probable cause of the foundering. The drainage hole between the hold and the fore peak effectively rendered these spaces as one compartment, exacerbating the effects of floodwater in the hold which, in turn, would have accelerated the foundering (Figure 14). Following extensive trials and testing, and in the absence of any other plausible explanation, it is concluded that water probably entered the hold from the deck wash hose. When the crew went for their meal, the general service (deck wash) pump was probably running, the hold hatch cover was open and a number of bait boxes were stacked aft of the hatch coaming. It is probable that the hose, which could flail around the deck if not firmly secured, became wedged between the bait boxes, and
37 this allowed water to spray against the open hatch cover and fall into the hold. As the general service (deck wash) pump had a rated capacity of 35t/hr, the water in the hold could have accumulated to a critical point, in the worst case, within an hour. 2.6 ABANDONING THE VESSEL The skipper and crew woke as the vessel acquired a significant bow down trim. Once roused, they all exited the accommodation through the wheelhouse, but on reaching the aft deck they were forced to stand on the aft bulkhead of the wheelhouse due to the attitude of the vessel. There was no evidence to suggest that abandon ship drills had been routinely practised on Louisa but the skipper’s decision to return to the wheelhouse to collect lifejackets and then instruct the crew to operate the EPIRB and prepare the liferaft, was prudent and appropriate. Although cutting the liferaft canister straps and removing the liferaft from the canister was not in accordance with the manufacturer’s operating instructions, it was an appropriate action in the circumstances and should not have prevented the liferaft from being inflated had the CO2 cylinder been charged. The necessary speed of the abandonment gave no opportunity for the skipper and crew to don warm clothes. Their survival in water of 10ºC therefore relied heavily on them being able to board the liferaft and / or a rapid rescue. Figure 14: Hold/fore peak drain Drain hole Permanent ballast
38 2.7 COLD WATER SURVIVAL Without an inflated liferaft, the effect of cold water immersion was a significant hazard to the crew as they abandoned Louisa. That the skipper and his crew were able to discuss survival options once they were in the water indicates that they had overcome the immediate effects of cold water shock. That they were wearing lifejackets when they entered the water is likely to have been a major contributory factor to their surviving the initial shock by assisting them in keeping their airways clear of the water as they got their breathing under control. Thereafter, the crew would have suffered from cold incapacitation as their hands and legs cooled and they progressively lost dexterity and co-ordination. This would have reduced their ability to conduct survival tasks, and increased their reliance on the ability of the lifejackets they were wearing to maintain their airways clear of the water. As they became increasingly hypothermic, they would eventually have lost consciousness, but could have survived had their airways remained clear of the water until they were rescued. Postmortem examination results in respect of Christopher Morrison and Martin Johnstone indicate drowning as the cause of death. It is therefore uncertain to what extent they had succumbed to the effects of hypothermia at the time of death. By the time the ALB found the first unresponsive casualties, they had been in the water for approximately 1 hour and 52 minutes. The 50% survival rate for normally clothed individuals in water of 10ºC is predicted to be 2 hours. It is possible, therefore, that more of the crew would have survived had their lifejackets been more effective in keeping their mouths clear of the water and had rescue services arrived sooner. 2.8 LIFESAVING APPLIANCES 2.8.1 The liferaft - onboard management Louisa’s liferaft was on hire to the owners from Premium Liferaft Services. The hire agreement included annual replacement to comply with the requirement under MGN 499 (M+F) for annual servicing. However, the liferaft had not been changed for 2 years and was out of date for service. It was secured to the vessel with an HRU, which was also found to be out of date. When the crew attempted to operate the liferaft, it failed to inflate owing to the CO2 cylinder being empty. Although past its expiry date, the HRU was found to have operated and to have cut the liferaft canister securing strap. The shortcomings identified above indicate that insufficient attention was being paid on board Louisa to the fitting and servicing of the vessel’s liferaft. Had the liferaft been serviced/changed annually, as required, it is very likely that its replacement would have functioned correctly when it was needed on 9 April 2016.
39 2.8.2 The liferaft - servicing Refurbishment of the CO2 cylinder fitted to Louisa’s liferaft had been sub-contracted by Premium Liferaft Services to Thameside Fire Protection Company Limited in November 2011. Post-accident examination of the cylinder found that it had not been filled post-refurbishment, which had not been identified when its filled weight was written on the cylinder; there were surface cracks in the valve attachment thread at the neck of the cylinder; and, the valve assembly had not been tightened into the neck to the manufacturer’s recommended torque setting. The investigation found that Thameside Fire Protection Company Limited did not have access to any manufacturer’s information relating to maintenance of the cylinder or valve assembly, and relied on general requirements for cylinder testing under the transportation of pressurised gas cylinders BS EN 1968:2002. They were subject to third party audit in respect of their fire protection business but not in respect of liferaft cylinder testing. Premium Liferaft Services had not carried out any audit of Thameside Fire Protection Company Limited before sub-contracting work to the company. The sub-contractor’s omission to refill Louisa’s liferaft CO2 cylinder was almost certainly an isolated incident. However, it was allowed to occur owing to deficiencies in the work process. If there had been a formal work specification detailing each step of the process, including a requirement to record the cylinder weight before and after servicing, this deficiency ought to have been detected. The work processes and recording of cylinder maintenance were not well defined, with no detailed work specification issued by Premium Liferaft Services on despatch of the cylinders. The guidance in MGN 499 (M+F) relating to liferaft servicing also lacked definition in this regard. 2.8.3 Lifejackets The circumstances of this accident and the subsequent trials and testing of the Cosalt Premier (32kg or more) solid-filled lifejackets have raised concerns about the effectiveness of the lifejackets worn by Louisa’s skipper and crew. The second set of tests carried out by the Department of Transport in May 1992 on the Cosalt Premier (32kg or more) solid-filled lifejackets met the requirements specified by the IMO (see section 1.9.7). If these tests had been conducted with the test subjects wearing normal clothing, and similar results had been achieved, it would have also met the corresponding requirements for novel individual buoyancy equipment. However, the conditions applied to the water performance tests both in 1992 and under current requirements are restricted (test subjects wearing only swimming costumes and in still, fresh water). Against the testing requirements for the Cosalt Premier (32kg or more) solid-filled lifejacket (A.689(17) and MSC.81(70)), an Administration has, in particular circumstances, discretion to disregard a very slight deviation from the specified criteria. Against the current testing requirement (MSC.200(80)), there is a possibility of a lifejacket meeting the test requirements having recorded a number of ‘no-turns’. Therefore, the IMO testing requirements acknowledge that an approved lifejacket may, under some circumstances, be incapable of satisfactorily turning a face down, unresponsive casualty, and keeping their airway clear of the water. This highlights
40 the absence of any factor of safety to take account of the lifejacket being used in operational conditions i.e. with an unspecified range of subjects wearing clothing other than swimming costumes in other than calm conditions. Prototype lifejackets that initially fail approval tests could be retested using the same or different test subjects (within the defined criteria) and subsequently pass the required tests without modification, as was the case with the Cosalt Premier (32kg or more) solid-filled lifejacket in 1992. Conversely, lifejackets that pass the required tests could subsequently fail the tests without modification, as demonstrated by the tests commissioned by the MCA following this accident (see section 1.9.8). The variability of outcome evidenced by testing of the Cosalt Premier (32kg or more) solid-filled lifejackets raises doubts about the robustness of the testing regime. Further amendments to the recommended lifejacket water performance tests, introduced on 22 May 2014 (MSC.378(93)), notably relax the turning time and freeboard requirements against amended design and construction requirements for an RTD, reducing pre-existing safety factors. Paul Alliston, Christopher Morrison and Martin Johnstone had all undertaken sea survival training during which they were taught how to don lifejackets correctly. That all three were found unresponsive and face down in the water indicates that their lifejackets were incapable of turning them onto their backs and keeping their airways clear. Assuming that they had donned and secured their lifejackets in accordance with their training and the manufacturer’s instructions, this finding supports that of the MAIB lifejacket trials and the MCA commissioned testing, and questions the suitability of both historical and extant lifejacket water performance test protocols. 2.8.4 Inflatable PFDs The MAIB lifejacket trials found that the inflatable PFD, of the same make and design as those available but unused on Louisa, righted a face down test subject within 2s on each occasion. The PFDs issued to Louisa were intended for use during normal fishing operations rather than vessel abandonment. However, they had remained in their original packaging, showed no signs of use and were out of date for servicing. This was not unexpected as, despite campaigns to encourage their use and as highlighted in the Annie T and Harvester MAIB reports, many UK fishermen have not yet accepted the rationale for routinely wearing these valuable safety devices. 2.8.5 LSA maintenance The LSA on Louisa was commensurate with carriage requirements but significant items were out of date for test or replacement. The liferaft should have been serviced annually but was overdue for service by a year, the HRU was found to have functioned satisfactorily but was overdue for replacement, and the EPIRB’s battery was also overdue for replacement. While not part of the formal LSA outfit, the PFDs were also out of date for service. Even where items of safety equipment have been hired, the responsibility to maintain and service them to ensure they remain in date and fit for purpose rests with the vessel’s owners. Notwithstanding this, Premium Liferaft Services operated a system for prompting hirers when payment was due based on invoice dates.
41 However, the invoice dates did not align with service dates. With minor adjustments and a focus on servicing requirements, the system could have provided a potentially useful prompt to Louisa’s owners that the liferaft was due for replacement under their existing contract. 2.9 SEARCH AND RESCUE 2.9.1 Summary of key times and events Time (UTC) Event 0232 Satellite detects EPIRB alert. 0239 New incident input to Vision 4. UKMCC advises CGOC of EPIRB alert. 0241 Second satellite detects EPIRB alert. 0244 UKMCC enters coarse EPIRB position into Vision 4. 0250 UKMCC passes co-ordination to CGOC Falmouth. 0251 CGOC Falmouth requests CGOC Stornoway to contact vessel. 0251 UKMCC receives refined EPIRB position. 0306 NMOC notes on Vision 4 that it is aware of the EPIRB alert and that it is monitoring narrative. 0312 UKMCC enters refined EPIRB position into Vision 4. 0316 CGOC Falmouth confirms with UKMCC that refined position is accurate to 120m and passes co-ordination to CGOC Stornoway. 0322 CGOC Stornoway pages Barra ALB DLA. 0327 CGOC Stornoway contacts ARCC and requests SAR helicopter. 0333 CGOC Stornoway pages Barra ALB crew. 0340 Barra ALB launches. 0344 CGOC Stornoway pages R948 aircraft crew. 0356 CGOC Humber advises CGOC Stornoway that IMdatE system placed Louisa in Mingulay Bay at 0140. 0413 Barra ALB arrives on scene in Mingulay Bay. 0424 Barra ALB locates two unresponsive casualties. 0539 R948 SAR helicopter reports having recovered survivor. Table 2: Summary of key times and events 2.9.2 UKMCC/HMCG interface At the outset of the emergency response, there was confusion between UKMCC and CGOC Falmouth with respect to the application of the descriptors used to define the alert. On this occasion resolved, unresolved, refined and unrefined, appeared in the coastguard log, which differed from the standard terminology used by Cospas-Sarsat and UKMCC (see 1.10.3). There was also a lack of understanding of the operation of the Cospas-Sarsat system relating to encoded and alert only beacons.
42 The coastguard operator recognised an unresolved alert but was unsure of the term unrefined which was used by the UKMCC operator to describe the location in place of the standard term coarse position. In turn, the UKMCC operator was unsure how the embedded global positioning satellite (GNSS) function of the EPIRB worked and, although aware that the coarse position had accuracy of 15nm associated with it, was unable to satisfactorily explain this to Falmouth. The reliance on a LEOSAR with a pass time of 0410 was unreasonable given the environmental conditions and predicted survival times. Even when the second, refined position was received the UKMCC operator was still concerned about a lack of data points, which had no relevance in relation to a position generated by a GNSS embedded EPIRB. The inconsistent terminology for EPIRB positions used by UKMCC and coastguard, coupled with insufficient knowledge of the EPIRB and satellite system, caused confusion and resulted in a delay in prosecuting SAR action. 2.9.3 Speed of response On receipt of Louisa’s EPIRB alert, UKMCC checked that it was a new alert, and then informed CGOC Falmouth and initiated a new incident on Vision 4. UKMCC and CGOC Falmouth then checked the EPIRB’s registration details, and UKMCC categorised the alert as an unresolved 406 alert with a location of 56 45.00N 007 30.00E. UKMCC passed co-ordination to CGOC Falmouth, who then requested CGOC Stornoway to initiate local information gathering. CGOC Falmouth implemented HMCG’s standard operating procedure for satellite distress beacon alerts based on receipt of a detect only or unresolved alert, meaning that the EPIRB’s position will only be confirmed following local information gathering and/or through the unresolved location becoming resolved following a second satellite pass. In either event, co-ordination remained with CGOC Falmouth until the EPIRB’s position was confirmed. Although included as an option in the procedure, in view of the uncertain timescale required to confirm an EPIRB’s position following a detect only or unresolved alert, and the potential inaccuracy of an unresolved location, no consideration is normally given to tasking SAR assets until such time as the position is confirmed. The procedure states: ‘An EPIRB activation is always a DISTRESS ALERT’, implying that SAR tasking should be initiated as soon as the EPIRB’s position is confirmed. The introduction of GNSS enabled EPIRBs provides an opportunity to significantly improve SAR speed of response. A coarse position is subject to an assumed maximum error of 15nm, which is sufficiently accurate to identify the relevant CGOC and to start tasking SAR assets in readiness to deploy once the refined position, accurate to within 120m, is received. Local information gathering is still important to attempt to confirm whether or not an alert is false, prior to receipt of the refined position and a decision to deploy SAR assets. However, it is no longer a priority for the purpose of confirming the EPIRB’s position. The benefit of GNSS enabled EPIRBs with respect to SAR response time was highlighted in the Ocean Way MAIB report.
43 HMCG’s standard operating procedure for satellite distress beacons currently makes no specific reference to the handling of GNSS enabled EPIRB alerts. 2.9.4 Response to Louisa’s EPIRB alert Louisa’s EPIRB alert provided a coarse position that was 5.54nm from its actual position and within CGOC Stornoway’s area of operations. CGOC Falmouth was advised of the EPIRB’s coarse position at 0239. A refined EPIRB position was received by UKMCC at 0251, but it was not until 0316 that CGOC Falmouth passed co-ordination to CGOC Stornoway, and not until 0322 that CGOC Stornoway started SAR asset tasking. Contributing to this delay might have been that CGOC Falmouth was not made aware of the refined position until UKMCC entered the information into Vision 4 at 0312. Although contrary to HMCG’s standard operating procedure for satellite distress beacon alerts, if CGOC Falmouth had passed co-ordination to CGOC Stornoway at 0239, CGOC Stornoway could have started to task SAR assets in readiness to deploy once the refined position had been received. In the event, Barra ALB launched at 0340, incurring an unnecessary delay to the SAR response of 49 minutes. If SAR asset tasking had started once the refined position had been received by UKMCC at 0251, a delay of 31 minutes could have been avoided. However, in the event, this position was not apparent to CGOC Falmouth until it was entered into Vision 4 at 0312. 2.9.5 Incident location The EPIRB’s coarse position was categorised as unresolved, prompting CGOC Falmouth to request CGOC Stornoway to initiate local information gathering in accordance with HMCG’s standard operating procedure. Although not a confirmed position, the EPIRB’s coarse position was actually 5.54nm south-east of Mingulay Bay and in an area that a Stornoway registered fishing vessel could reasonably be expected to be operating. In the absence of an AIS transmission from Louisa, no personal locator beacons being worn by the skipper and crew, and no success in calling the EPIRB’s registered emergency contacts, CGOC Stornoway was reliant on establishing a confirmed position by other means. The benefits of an historical track of a vessel’s movements, and of wearing personal locator beacons, to those involved in SAR, were highlighted in the Harvester MAIB report. Vessel monitoring system (VMS) positional data for Louisa was available to HMCG and could have been used to assist in establishing the vessel’s location. Louisa’s last positon had been transmitted at 0140 and put the vessel in Mingulay Bay. VMS positional data was accessed by neither CGOC Falmouth, CGOC Stornoway nor the NMOC, and it was not until 0356 that CGOC Humber highlighted this information. The Ocean Way MAIB report highlighted the benefits of CGOCs having computer systems capable of gaining access to essential information from all available databases. In response, the MCA gave assurance that the computer equipment in all CGOCs would be capable of accessing vessel positional data in a timely manner. HMCG’s omission to use all available tools suggests insufficient training and manpower resource for its CGOCs to act autonomously.
44 2.9.6 Network activity Although each CGOC can act autonomously, the current coastguard model is of a network of individual nodes which combine to provide support as required. This is overseen by a network controller who manages routine workload to match network resources and provides supervisory cover in the event of an operational incident. The network duty controller was on a break from 0300 to 0430, not returning to his post until after the SAR assets were on scene and the casualties had been located. During this period, the network was being monitored by a trainee who had been employed by HMCG for only 3 months. CGOC Stornoway’s duty SMOO and MOO, who was still undergoing training, attempted to deal with a wide range of tasks. Additional workload was caused by a number of system-related deficiencies and communication problems. A lack of network interaction and supervision meant that the network was ineffective in supporting the SAR operation to the extent of eliminating confusion and ensuring a timely response to the EPIRB alert. The Aquila and Ocean Way MAIB reports highlighted the need for effective network communications and co-ordination between CGOCs and the need to follow effective procedures to ensure important information is not overlooked in demanding situations.
45 SECTION 3 - CONCLUSIONS 3.1 SAFETY ISSUES DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS
While all on board went to bed in the accommodation, the configuration of Louisa’s machinery was inconsistent with best practice and demonstrated an underestimation of the risks associated with flooding and foundering. [2.3]
The bilge alarm sounder in the crew cabin had previously been disabled and prevented early notification of hold flooding to the skipper and crew. [2.4]
Instead of managing work routines to prevent fatigue and so ensure adequate levels of safety were maintained, the skipper drove the crew and himself to a state of tiredness such that the safety of the vessel and its crew was compromised. [2.4]
Modelling of possible foundering scenarios identified flooding of the hold as the probable cause of Louisa’s foundering. The probable means by which the water entered the hold was from the deck wash hose. [2.5]
The deck wash pump had probably been left running, and it is likely that the hose became wedged between bait boxes stacked aft of the hold hatch coaming, allowing water to spray against the open hold hatch cover. [2.5]
The necessary speed of vessel abandonment gave no opportunity for the skipper and crew to don warm clothes. Their survival in water of 10ºC therefore relied more heavily on entry to the vessel’s liferaft and/or a rapid rescue. [2.6]
It is possible that there would have been more survivors had the skipper and crew’s lifejackets been more effective in prolonging their survival and/or had the rescue services arrived sooner. [2.7]
The liferaft servicing company’s sub-contractor omitted to refill Louisa’s liferaft CO2 cylinder owing to deficiencies in the work process. The work processes and recording of cylinder maintenance were not well defined and no detailed work specification was issued by the liferaft servicing company on despatch of the cylinders. [2.8.2]
The guidance in MGN 499 (M+F) relating to liferaft servicing lacked definition with regard to a liferaft servicing company sub-contracting work in respect of maintaining and refilling liferaft CO2 cylinders. [2.8.2]
IMO testing requirements acknowledge that an approved lifejacket may, under some circumstances, be incapable of satisfactorily turning a face down, unresponsive casualty and keeping their airway clear of the water. This highlights an absence of any factor of safety to take account of the lifejacket being used in operational conditions i.e. with an unspecified range of subjects wearing clothing other than swimming costumes in other than calm conditions. [2.8.3]
46
Assuming that they had donned and secured their lifejackets in accordance with the manufacturer’s instructions, the fact that the skipper and two crew were found face down in the water supports the findings of MAIB trials and the MCA commissioned testing following the accident and questions the suitability of lifejacket water performance test requirements. [2.8.3]
Significant items of safety equipment on board Louisa were out of date for test or replacement. [2.8.5]
The liferaft servicing company operated a system for prompting hirers when payment was due based on invoice dates. With minor adjustments and a focus on servicing requirements, the system could have provided a potentially useful prompt to Louisa’s owners that the liferaft was due for replacement under their existing contract. [2.8.5]
Inconsistent terminology for EPIRB positions used by UKMCC and CGOC Falmouth, coupled with insufficient knowledge of the Cospas-Sarsat system, caused confusion and resulted in an unnecessary delay in prosecuting SAR action. [2.9.2]
HMCG’s standard operating procedure for satellite distress beacons currently makes no specific reference to the handling of GNSS enabled EPIRB alerts. [2.9.3]
HMCG’s omission to use all available tools suggests insufficient training and manpower resource for its CGOCs to act autonomously. [2.9.5]
A lack of network interaction and supervision meant that the network was ineffective in supporting the SAR operation to the extent of eliminating confusion and ensuring a timely response to the EPIRB alert. [2.9.6] 3.2 OTHER SAFETY ISSUES18
The work ethic that resulted in the skipper driving himself and the crew to a level of tiredness that compromised their safety, can be linked to the share remuneration scheme, which encouraged them to grasp every opportunity to continue fishing and maximise the catch whenever suitable conditions prevailed. [2.4]
The PFDs issued to Louisa, which were intended for use during normal fishing operations rather than vessel abandonment, had remained in their original packaging. Despite campaigns to encourage their use, many UK fishermen have not yet accepted the rationale for routinely wearing these valuable safety devices. [2.8.4] 18 These safety issues identify lessons to be learned. They do not merit a safety recommendation based on this investigation alone. However, they may be used for analysing trends in marine accidents or in support of a future safety recommendation
47 SECTION 4 - ACTION TAKEN 4.1 MAIB ACTIONS The MAIB has: Issued a Flyer to the Fishing Industry (Annex H). 4.2 ACTIONS TAKEN BY OTHER ORGANISATIONS The Maritime and Coastguard Agency has:
Issued MGN 553 (M+F) – Life-Saving Appliances – Inflatable Non-SOLAS Liferafts, Lifejackets, Marine Evacuation Systems, Danbuoys and Lifebuoys – Technical Standards and Servicing Requirements, which includes guidance for liferaft servicing companies on sub-contracting work in respect of servicing liferaft CO2 cylinders.
Conducted testing of the Cosalt Premier (32kg or more) solid-filled lifejacket used in the MAIB trials, an additional Cosalt Premier (32kg or more) solid-filled lifejacket and a similar, widely available solid-filled approved lifejacket. All three lifejackets failed to meet required test standards (see section 1.9.8).
48 SECTION 5 - RECOMMENDATIONS The Maritime and Coastguard Agency is recommended to: 2017/130 Urgently conduct research to confirm or otherwise the effectiveness of SOLAS lifejacket water performance test requirements to ensure approved lifejackets will satisfactorily turn a face down, unconscious person onto their back with sufficient orientation and buoyancy to maintain their airway clear of the water. Any shortcomings in the water performance test requirements that may be identified should be brought to the attention of the International Maritime Organization for action. 2017/131 Update and enhance its response to satellite distress beacon alerts, particularly with regard to GNSS enabled EPIRBs, in respect of: ● ●HMCG’s standard operating procedure. ● ●Staff training, in terms of both Cospas-Sarsat system knowledge and HMCG’s operational requirements including the definition of standard terminology in relation to beacon alerts. ● ●Network functionality, reliability, supporting interactivity and resource, in terms of both manpower and equipment. Premium Liferaft Services is recommended to: 2017/132 Update its liferaft servicing procedures to ensure: ● ●Any anomalies in the recorded CO2 cylinder weight can be readily identified. ● ●Definitive work specifications are issued to sub-contractors. ● ●Selected sub-contractors are suitably qualified to undertake the specified work. ● ●Introduce a formal process to advise hirers when their liferafts are due for service. ● ●Compliance with the content of MGN 533 (M+F). Thameside Fire Protection Company Limited is recommended to: 2017/133 Introduce liferaft CO2 cylinder servicing procedures to ensure: ● ●Any anomalies in the recorded CO2 cylinder weight can be readily identified. ● ●Sufficient documentation is held to facilitate servicing a CO2 cylinder in accordance with the liferaft servicing company’s work specification and the particular liferaft manufacturer’s instructions.
49 Louisa’s owners are recommended to: 2017/134 With respect to any fishing vessel they may own in the future, ensure that the vessel remains compliant with the relevant mandatory Code of Practice by: ● ●Developing a planned maintenance system to ensure the vessel is maintained and its safety equipment serviced in accordance with statutory requirements and manufacturers’ instructions. ● ●Conducting formal risk assessments appropriate to the vessel’s anticipated range of activities. Safety recommendations shall in no case create a presumption of blame or liability
Marine Accident Report
FD06053 | 2018_英国_MAIB_entry-to-enclosed-space-on-fishing-vessel-sunbeam-with-loss-of-1-life__Sunbeam_CombinedAnn.pdf
分类:06_境外及港澳台调查报告 | 年份:2018 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
Annex A MGN 309(F) Fishing Vessels —The Dangers of Enclosed Spaces
1 - MARINE GUIDANCE NOTE
MGN 309 (F)
Fishing Vessels – The Dangers of Enclosed Spaces
Notice to all Owners, Builders, Employers, Skippers and Crews of Fishing Vessels.
Summary
This note warns of the unseen risks from the build-up of gases in “enclosed” spaces including refrigerated Salt Water (RSW) tanks and provides guidance on the avoidance of such risks and of the safe entry into enclosed spaces.
Key Points
• Be aware that unless absolutely necessary, avoid enclosed spaces whilst at sea • Be aware of what constitutes a dangerous enclosed space • Be aware of the procedures for preventing toxic gases in RSW tanks
If entry to enclosed space is necessary
• Be aware of the procedures for prevention of risk • Be aware of how to test the atmosphere • Be aware of the preparations required before entering • Be aware of how to work while in an enclosed space • Be aware how to leave
- Introduction
- 1 Whilst on board a United Kingdom fishing vessel operating off the west coast of Africa
three crew members tragically lost their lives.
- 2 The Marine Accident Investigation Branch (MAIB) report identified the release of
dangerous gases from decaying fish, fish waste or offal as the cause of the accident. The source of the gases was a Refrigerated Salt Water (RSW) tank.
- 3 The tank had not been cleaned or chilled after use and a residue of fish and sea water
remained. Hydrogen, cyanide, hydrogen sulphide and carbon dioxide gas accumulated over a period of several days; the effect being accelerated in tropical temperatures.
- 4 Gases were released into an occupied working space and inhaled when a side door to the
RSW tank was opened, with fatal consequences to three of the crew and injuries to others.
- 2 -
- 5 In another case a vessel’s engineer lost his life as a result of high carbon monoxide (CO)
poisoning. A portable, petrol-engined pump was being used with the pump exhausting directly into the engine room. 1.6 These incidents further highlight:
.1 that all spaces receiving little or no ventilation, including RSW tanks, should be treated as potentially dangerous;
.2 the need for proper training in the use of plant and equipment; and
.3 the importance of completing a thorough safety risk assessment and of informing the crew of the measures taken for their safety and health (see MGN20).
- WHAT IS MEANT BY A DANGEROUS “ENCLOSED SPACE”?
- 1 A dangerous enclosed space:
.1 One that is poorly ventilated or sealed with the oxygen reduced to low levels; or
.2 where toxic and/or flammable gases have built up to dangerous levels.
- 2 Many forms of chemical reaction can cause low oxygen levels or dangerous gases to build
up, for example the decay of waste material or the exhaust from machinery, one common source is corrosion or rusting, which can significantly reduce the oxygen content in a space. All enclosed spaces therefore need to be treated with caution before opening or entering.
- 3 Examples of such spaces on fishing vessels are:
.1 RSW tanks; .2 Fuel tanks; .3 Fish holds containing decaying fish, fish waste or offal; .4 Fresh water tanks; .5 Sea or fresh water ballast tanks; .6 Void spaces; and .7 Stores containing chemicals.
- OPENING OR ENTERING AN ENCLOSED SPACE
- 1 Unless it is absolutely necessary, DO NOT open or enter enclosed spaces whilst at sea. It
is better to wait until the vessel is in port. Then “Call in the specialists” to certify that the air in the space is safe.
- 2 If entry is necessary, the following procedures are recommended prior to opening or
entering, together with others that may be identified as a result of risk assessment:-
- PREVENTION OF RISK
- 1 Ensure tanks are empty and not under pressure. Be patient and make sure that tanks are
completely empty.
- 2 Ensure filling pipes to tanks are isolated, that all valves are shut and notices are put up to
prevent tanks from being filled by someone else.
- 3 Ventilate spaces THOROUGHLY. Mechanical or natural means of ventilation may be
used, with more time given for natural ventilation.
- 3 -
- TESTING THE ATMOSPHERE
- 1 A person competent in the use of the equipment should test the atmosphere (air) inside a
space.
- 2 When testing the air for the first time, breathing apparatus should be worn.
- 3 An oxygen meter should be used, with a steady reading of 20% before entry is
considered.
- 4 A combustible gas indicator (“explosimeter”) should be used to test for combustible
gases where these are suspected, especially where this may be a build up of hydrogen (e.g. in fuel tanks).
- 5 Toxic gases should also be tested for where any risk is suspected, the test equipment
being specific to the gas (e.g. for unclean RSW tanks, test for hydrogen sulphide and hydrogen cyanide).
REMEMBER
IF TESTING APPARATUS IS NOT ON BOARD AND DOUBT EXISTS ABOUT THE SAFETY OF THE SPACE, DO NOT ENTER!
- PREPARING TO ENTER
- 1 The following should be carried out before entry.
- 2 Ensure the space is well lit, including the entrance.
- 3 Remove sources of ignition from clothing, such as matches or lighters.
- 4 Position appropriate rescue equipment at the entrance, such as breathing apparatus,
(intrinsically safe) torches, life lines and hoists.
- 5 Limit the number of persons entering the space.
- 6 Place an attendant at the entrance, who should remain there until everyone has left the
space.
- 7 Agree and test a suitable means of communication.
- DURING ENTRY TO A SPACE
- 1 Whilst inside the enclosed space, the following procedures should be observed.
- 2 Regular communication should be maintained.
- 3 Continue ventilating the space.
- 4 Every so often, re-test the atmosphere in the tank and if any doubt exists, stop the
operation.
- 5 Should an emergency occur, the attendant at the entrance should raise the alarm and
should NOT ENTER the space himself until help has arrived.
- 6 Breathing apparatus MUST be worn during any rescue from a space. Once making
contact with a casualty, he must be removed to safety and given first aid as necessary.
- 4 -
- LEAVING A SPACE
- 1 After completion of the operation, everyone should leave the space and the entrance
should be resealed (unless further entry is required).
- RSW TANKS
- 1 MAIB commissioned research into the toxic gases produced by fish as they decay. The
study revealed that:-
.1 Temperature influences the level of toxic gases produced by decaying fish in sea water;
.2 At 45°C, a “half and half” mix of rotting fish and sea water produced dangerous levels of hydrogen cyanide, hydrogen sulphide and carbon dioxide after only 24 hours;
.3 At 35°C, similar results to 45°C were obtained;
.4 At 20°C, a “half and half mix” of rotting fish and sea water produced dangerous levels of hydrogen cyanide, hydrogen sulphide and carbon dioxide after just 64 hours;
.5 At 5°C, only traces of the three gases were measured after 10 days.
- 2 The research identifies the importance of the following procedure for the RSW tanks,
particularly when operating in warmer waters:-
.1 Immediately clean all un-chilled RSW tanks after use, removing all residues.
.2 If cleaning has not occurred immediately and a mixture of fish and sea water has been left for more than a few hours, flush the tank through (using the appropriate sea water pump) and fully ventilate the tank.
.3 Ensure adequate ventilation exists in spaces adjacent to RSW tanks.
.4 On no account open or enter RSW tanks known to contain sea water/decaying fish unless the full procedures for entry into an enclosed space have been carried out ( see paragraphs 4-8 above).
- FURTHER ADVICE
- 1 Crew of vessels that operate at sea for longer periods, particularly on those of 24 metres
and over in registered length may have need to enter enclosed spaces whilst at sea. Further guidance on enclosed spaces may be found elsewhere, such as the Code of Safe Working Practices for Merchant Seamen.
- 5 -
Further Information
Further information on the contents of this Notice can be obtained from:
Fishing Vessel Safety Branch Bay 2/05 Maritime and Coastguard Agency Spring Place 105 Commercial Road Southampton SO15 1EG
Tel :
+44 (0) 23 8032 9163 Fax :
+44 (0) 23 8032 9447 e-mail:
General Inquiries: 24 Hour Infoline infoline@mcga.gov.uk 0870 600 6505
MCA Website Address: www.mcga.gov.uk
File Ref:
MS 088/001/436
Published:
January 2006
© Crown Copyright 2006
Safer Lives, Safer Ships, Cleaner Seas
Printed on material containing minimum 75% post-consumer waste
Annex B Extract of Sunbeam’s Safety Folder including risk assessment Form G12 – Maintenance Work
SUNBEAM SAFETY FOLDER SUNBEAM - FR487 SAFETY FOLDER DOCUMENT CONTROL Contents Preface Authorisation For Issue ) Distribution List Amendment Record Comments Sheet Abbreviations SECTION 1: FISHING VESSEL POLICY STATEMENT ................................................... 1.1 SECTION 2: EMERGENCY PROCEDURES .................................................................... 2.1 SECTION 3: CREW LIST AND STATEMENT ................................................................... 3.1 SECTION 4: SAFETY EQUIPMENT CHECKLIST............................................................ 4.1 SECTION 5: RISK ASSESSMENT.................................................................................... 5.1 Appendix 5.1 Standa Appendix 5.2 Standa~ Appendix 5.3 Standar Appendix 5.4 Standar Appendix 5.5 Standar isk As orm Appendix 5.6 Assessment Forms (Spare forms) Appendix 5.7 Action Lists (Spare forms} Appendix 5.8 Crewmember (Spare forms} Appendix 5.9 Reported Faults (Spare forms} Appendix 5.1 o Substance Abuse Policy ing/seining ing and Dredging FR487 AMENDMENT No. 00 DA TE: August 2000 REVISION 00 PAGE: i of vii
SUNBEAM FR487 SAFETY FOLDER PREFACE This document has been prepared for the SUNBEAM - FR487, and has been compiled following an initial meeting/training session where safety details regarding the vessel were confirmed. Whilst we are confident that this SAFETY FOLDER contains the relevant details required to comply with regulations, it remains the responsibility of the Person Responsible for the Health and Safety (See Section 1 ), to ensure that the information is correct and accurate for your vessel. Please ensure that the required signatories are obtained to complete your SAFETY FOLDER. Regulations The Merchant Shipping and Fishing Vessels (Health and Safety at Work) Regulations 1997 which came into force 31st March j19981fe'tJU el Prepare a written state as often. as may be ap Ith and safety and revise this n five workers}. Carry out risk assessments to identify the risks of health and safety of workers in the normal course of their activities or duties (Applies on all vessels on which any worker is employed). This document has been produced to comply with the Merchant Shipping and Fishing (Health and Safety at Work) Regulations 1997, and to the guidance given in MCA Marine Guidance Note MGN20 (based on the Safety Folder supplied by Seafish Industry Authority). Controlled Document The distribution of this doc will only be accepted for documents issued by the d Review and. Update ot be divided. Responsibility r revisions} of the original . This manual will be subject to regular review and update, when all copy holders will have the opportunity to express opinions and suggest improvements. However, the document control system allows for continuous update of this document. As such, any user may at any time identify an error or suggest an improvement by using the Comments Sheet. Copy Holder's Responsibilities It is the responsibility of the registered copy holder to maintain the accuracy of this document by ensuring that all updates are promptly incorporated and acknowledged. We recommend that you the contents with crewme updated during your onboa rd your vessel, and discuss re for fire can be tested and Your decision to compile this SAFETY FOLDER is a initial step towards a new SAFETY CULTURE, and as this develops the contents of your SAFETY FOLDER will reflect your commitment to the safety practices aboard your vessel. Thank you for selecting Cabern Ltd., to assist you to compile your SAFETY FOLDER. Your SAFETY CULTURE is a continuing process, and Cabern Ltd., will be pleased. to offer our services for future developments ( ). AMENDMENT No. 00 DATE: August 2000 REVISION 00 PAGE: ii of vii
Sunbeam FR487 - Risk Assessment Review~itt9 This risk assessment and health and safety folder in connection with this vessel has been approved and checked by the following persons: Name Position Date Signed Crewmember Statement The safety equipment and procedures have been explained to me and I have been informed of the risk assessments that have been made, and will comply fully with all requirements for health and safety in connection with this vessel. Print Name Date Signed
) SUNBEAM SAFETY FOLDER AUTHORISATION FOR ISSUE Name:
Address:
Telephone:
AMENDMENT No. 00 DATE: August 2000 FR487 REVISION 00 PAGE: iii of vii
SUNBEAM FR487 SAFETY FOLDER DISTRIBUTION LIST This document is a controlled document and is identified by a unique number. Distribution is to Copy Holders as listed below. The Copy Holder of the numbered document is responsible for ensuring that any changes which may be issued are incorporated. Copy No.1 of the document is the Master Copy and is held by the Vessel Skipper. NOTE: Copy No. 1 will provide the latest information available, other controlled copy holders will be provided with the r·ei:~~ve nts. COPY NUMBER 1 AMENDMENT No. 00 DA TE: August 2000 Vessel Skipper or RESPONSIBLE PERSON REVISION 00 PAGE: iv of vii
SUNBEAM SAFETY FOLDER AMENDMENT NO. AMENDMENT No. 00 DATE: August 2000 DATE AMENDMENT RECORD PAGES AFFECTED FR487 SIGNATURE REVISION 00 PAGE: v of vii
) SUNBEAM FR487 SAFETY FOLDER SECTION 1 FISHIN POLICY The following section contains the Safety Policy, Responsible Person information, and vessel details. AMENDMENT No. 00 DATE: August 2000 REVISION 00 PAGE: 1.1 of 3
SUNBEAM FR487 SAFETY FOLDER FISHING VESSEL SAFETY POLICY STATEMENT This Safety Policy Statement sets out how we intend to operate this vessel in compliance with the Merchant Shipping and Fishing Vessels (Health and Safety at Work) Regulations 1997 and other health and safety regulations, to minimise the risk of accidents and ill health. Included in this statement are safety equipment, emergency measures, and risk assessments for activities and areas of the vessel. These will be reviewed every 12 months ( or sooner if significant changes have been made). Personal and Protective Equipment (PPE), information, . training, and the operating procedures necessary for the safety of the vessel and crew will be provided as required by the regulations. Name: Address: Telephone:
Signed: Person responsible for Health and Safety (if different from above) : Address: AMENDMENT No. 00 DATE: August 2000 REVISION 00 PAGE: 1.2 of 3
SUNBEAM FR487 SAFETY FOLDER ·S TION 5 The foll win i the Risk Assessment sheets for this vessel. Spare sheets, Action Lists, and Risk Assessment information. AMENDMENT No. 00 DATE: August 2000 REVISION 00 PAGE: 5.1 of 5
Vessel Name: SUNBEAM Standard Risk Assessment Form Activity or area Maintenance Work (Cont.) Other Assessor Name Possible hazards Electrical tools and equipment Liquid propane gas (LPG) Electrical work Enclosed spaces may have an unsafe atmosphere Possible conseauences Fatal electric shock/injuries mage, chemical , Respiratory lems 'lr.ttinn Suffocaf explosio Electric -u--•·• ... - , ~T)t},; I Deaths I I I Vessel Registration: FR487 F/P s F/PxS 1 3 3 1 I 3 I 3 1 I 3 I 3 1 I 3 ~.,, 1 3 3 Assessor Signature Reference No : G012 MAINTENANCE WORK Control measures necessary with respect to your vessel All tools must be in a safe condition, with effective controls, guards and other safety features correctly in place. Extension cables must be in good condition and carefully rigged to avoid damage or persons tripping over them. Safety circuit breakers should be used to oive protection. Correct PPE to be used. When using chemicals ensure that the safety information supplied with the chemical is studied and all precautions followed. Correct PPE to be used. Ensure that only trained experienced people are permitted to maintain refrigeration systems. Correct PPE to be used. Ensure that all persons are aware of the possible dangers. Not applicable to this vessel. Ensure that electrical fittings are in good order and that fuses or circuit breakers are correctly rated. Only competent persons should be allowed to work on electrical systems. spaces rn.ust beJreate~ \Vi.t~ caution. ,,. " , · · · · H'ations such as painting II persons involved wear nt time after painting for allowing free access. spaces, suCM*as taffffs that have held fuel or oil, do not enter until checks have been made to ensure that it is free of explosive gases and has a safe atmosphere.
- Do not enter any space that has been sealed without first
making checks that it is safe. Ensure that crewmembers are aware of the dangers and the rocedures to follow. Date Assessed:/.( ........ /, .... ... ;:: ..
Frequency/Probability (F/P) (How likely that harm may occur) 1 Very unlikely 2 Unlikely 3 Likely Severity (S) (How harmful) 1 Slightly harmful 2 Harmful 3 Very harmful Electrical T'.ool~',ndtE•,~ipm,~rat .. : All toolsmust be;!n~ .. s.,fe c~;tfl!P,i'!ith~ffectiv~~ebntrols, guards and other safety features · correctlyi;;,fri;,1,plac~ ~~pstt,111,1~,blesJ1tnust be in good condition and carefulf,Y rigged,,Jo avof9 dl!lmf~e qt P,.rtomJ1,';fripping over them. Safety circuit breakers should·be usetf;to give1l)rotsctltitf Chemicals If chemicals are being used for cleaning or other treatl'li!.§ the safety information supplied with the chemical is · followed. .1,Yy,/.J,;~'t;:;,1•2~r,,i, Refrigerant gases. Refrigerant gases should be treated with caution as a leakage may displace the oxygen from the atmosphere rendering persons unconscious. In liquid form, they will bum the skin. Only trained experienced people should be permitted to maintain refrigeration systems. Liquid propane gas (LPG) known as 1Calor Gas' Leakage of LPG is liable to result in an explosion and fire. Being heavier than air, the gas will collect in the bottom of the vessel and hence may be undetected. Aside from the danger of explosion, the gas may also suffocate. Great care is needed with LPG equipment and portable cylinders should be stored in a well ventilated area. Ensure that all persons are aware of the dangers. · Electrical work Only competent persons should be permitted to carry out electrical maintenance work. High power systems can give fatal electric shocks and 12 or 24 V systems can cause fires if badly maintained. Risk Factors (F/P x S)
1
No action is needed
2
Can be tolerated, but make sure that it does not become worse 3/4 - Take action but subject to it being reasonable and sensibly possible
6
Must be attended to, you must reduce the risk
9
Cannot be accepted and work/activity must not continue Enclosed spaces All enclosed spaces must be treated with caution. I. Ensure adequate ventilation when operations such as painting are taking place and make sure that all persons involved wear a suitable respirator. Allow sufficient time after painting for thorough ventilation of fumes before allowing free access. enclosed spaces, such as tanks that have held fuel or oil, do not enter I checks have been made to ensure that it is free of explosive gases and s a safe atmosphere. Ill. Do not enter any space that has been sealed without first making checks that it is safe. Ensure that er permit to work rocedures to follow. A -,.
Annex C MAIB Safety Bulletin 4/2018
Extracts from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 Regulation 5: “The sole objective of a safety investigation into an accident under these Regulations shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of such an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” Regulation 16(1): “The Chief Inspector may at any time make recommendations as to how future accidents may be prevented.” NOTE This bulletin is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2018 See http://www.nationalarchives. gov.uk/doc/open-government- licence for details. All bulletins can be found on our website: https://www.gov.uk/maib For all enquiries: Email: maib@dft.gov.uk Tel: 023 8039 5500 Fax: 023 8023 2459 Press Enquiries: 01932 440015 Out of hours: 020 7944 4292 Public Enquiries: 0300 330 3000 MAR I N E ACCID E NT I N V EST IGATI ON BRAN CH SAFETY BULLETIN SB4/2018 October 2018 Working in refrigerated salt water tanks Fatal enclosed space accident on board the fishing vessel Sunbeam (FR487) at Fraserburgh, United Kingdom on 14 August 2018
MAIB SAFETY BULLETIN 4/2018 This document, containing safety lessons, has been produced for marine safety purposes only, based on information available to date. The Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 provide for the Chief Inspector of Marine Accidents to make recommendations at any time during the course of an investigation if, in his opinion, it is necessary or desirable to do so. The Marine Accident Investigation Branch is carrying out an investigation into a fatal enclosed space accident on board the fishing vessel Sunbeam on 14 August 2018. The MAIB will publish a full report on completion of the investigation. Andrew Moll Chief Inspector of Marine Accidents NOTE This bulletin is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall not be admissible in any judicial proceedings whose purpose, or one of whose purposes, is to apportion liability or blame. This bulletin is also available on our website: www.gov.uk/maib Press Enquiries: 01932 440015; Out of hours: 020 7944 4292 Public Enquiries: 0300 330 3000
1 BACKGROUND Sunbeam (Figure 1) was a 56m UK registered pelagic trawler. Its home port was Fraserburgh, Scotland, and it was typically manned by a crew of eleven. In the weeks prior to the accident, it had been fishing for herring in the North Sea and landing its catch in Lerwick, Shetland. The vessel had nine refrigerated salt water (RSW) tanks for storing its catch. On 10 August 2018, Sunbeam arrived at Fraserburgh. It had caught and landed its seasonal quota of herring and was being prepared for a planned refit period. During the refit the vessel’s owner intended to replace Sunbeam’s refrigeration plant. INITIAL FINDINGS At about 0900 on 14 August, Sunbeam’s crew arrived at the vessel’s berth ready to begin work. The vessel’s refrigeration plant had been shut down after landing the final catch at Lerwick, and its RSW tanks had been pumped out and tank lids opened in preparation for deep cleaning. At some time between 1200 and 1350, Sunbeam’s second engineer entered the aft centre RSW tank (Figure 2) and collapsed. At about 1350, the second engineer was seen lying unconscious at the aft end of the tank by a crewmate, who immediately raised the alarm. Three of the vessel’s crew entered the tank and tried to resuscitate the second engineer but they soon became dizzy, confused and short of breath. One of the crew managed to climb out of the tank unaided, the other two crewmen and the second engineer were recovered onto the open deck by two crewmen wearing breathing apparatus. The two crewmen made a full recovery, but the second engineer could not be resuscitated and died. It is unclear when and why the second engineer entered the tank. However, evidence indicated that his intention was to sweep the residual seawater that had settled at the aft end of the tank forward in to the tank’s bilge well. No safety procedures for entering or working in RSW tanks had been completed before he entered the tank. Figure 1: FV Sunbeam
2 Tests of the atmosphere in the tank following the accident showed that the level of oxygen at the bottom was less than 6% (normal level should be 20.9%). Further tests of both the tank atmosphere and residual water samples showed the presence of Freon R22, the refrigerant gas used in the RSW tank’s refrigeration plant. The MAIB’s initial investigation identified that the refrigeration plant sea water evaporators had suffered several tube failures resulting in a number of repairs (Figure 3). It is likely that the refrigerant leaked through one or more failed tubes into the seawater system, and was released into the RSW tank. Freon R22 is four times heavier than air so it will displace oxygen at the bottom of an enclosed space, such as an RSW tank. It is a toxic, tasteless and mostly odourless gas. If it is deeply inhaled, it can cut off vital oxygen to blood cells and lungs. SAFETY LESSONS The RSW tanks on board Sunbeam were, by design, enclosed spaces that did not have a fixed means of positive ventilation. Such spaces can become dangerously hazardous to life. The atmosphere in the tanks can become oxygen deficient through the effects of corrosion, or toxic through the decomposition of sludge or fish, or, as in this case, the accidental release of gas. Other hazards, such as flooding and heat exhaustion can also be a threat to life. Figure 2: Aft centre RSW tank
3 It is the responsibility of vessel owners/operators to ensure that suitable measures are taken to safeguard the crew. All work activities should be subject to risk assessment and safe systems of work should be put in place. Working in enclosed spaces is particularly hazardous, and procedures for entering and working in them should be robust and understood. Similarly, rescue plans need to be put in place and fully understood and should be practised. Widely recognized safety controls for working in enclosed spaces include:
●Atmosphere testing.
●Provision of positive ventilation.
●Safety sentry at entry point.
●Breathing apparatus available for rescue team.
●Safety harness and means of recovering an unconscious person. It is also the responsibility of crew members to behave in a safe manner. This is particularly important when working alone. Tubes plugged by previous repairs Air bubble Figure 3: Starboard evaporator tube leak
4 This was a tragic accident, which nearly resulted in multiple fatalities. The crew did not appreciate the levels of risk they were taking, even after the second engineer had collapsed. The Maritime and Coastguard Agency provides further guidance in its Marine Guidance Note MGN 309 (F) Fishing vessels: the dangers of enclosed spaces, and the Fishermen’s Safety Guide. The findings from an investigation into a similar accident on board the pelagic trawler Oileάn An Óir, in Ireland in 2015, which resulted in two fatalities, also highlight the potential dangers of RSW tanks.1 RECOMMENDATION Sunbeam’s owners are recommended to: S2018/129 Conduct risk assessments specifically for entering and working in RSW tanks and provide safe operating procedures for its crew to follow and appropriate levels of safety equipment to use. Safety recommendations shall in no case create a presumption of blame or liability 1 The Department of Transport, Tourism and Sport in Ireland issued Marine Notice No.43 of 2016.
Annex D MAIB Safety Flyer to the Fishing Industry
SAFETY FLYER TO THE FISHING INDUSTRY Fatal enclosed space accident, on board the pelagic trawler Sunbeam on 14 August 2018 Narrative During the afternoon of 14 August 2018, a second engineer working on board the pelagic trawler Sunbeam was found collapsed inside a refrigerated salt water (RSW) tank. Sunbeam was in Fraserburgh and the crew were preparing for a refit; the evidence suggested that the second engineer had entered the RSW tank to sweep away residual water. When the second engineer was found, other members of the crew rushed to his aid, including three others who entered the tank, one of whom also collapsed. The crew members in the tank were rescued by Sunbeam’s mates, who were wearing breathing apparatus; only three of the four crew who entered the tank survived. Safety Lessons
Sunbeam’s RSW tanks were enclosed spaces because they had limited openings, no ventilation and were not intended for continual worker occupation. The accident happened because the second engineer entered the tank without any of the safety precautions normally associated with such a hazard being in place, specifically: the atmosphere was not monitored, there was no plan for the work or a rescue, and the second engineer was working alone without means of communication. Sunbeam
Entering Sunbeam’s RSW tanks without safety precautions having been implemented had become normalised by the crew as this had been completed without consequence over many years of the vessel’s operations. However, on this occasion the atmosphere could not support life as refrigerant gas (Freon in this case) had leaked into the space through failed evaporator tubes in one of the vessel’s refrigeration plants.
While a leak of refrigerant gas might have been less foreseeable than hazards such as oxygen depletion from corrosion or hydrogen sulphide from rotting fish, it simply serves to underpin the critical need for atmosphere monitoring in enclosed spaces.
All work activities should be subject to risk assessment and safe systems of work. Working in enclosed spaces is particularly hazardous, and procedures for entering and working in them should be robust and understood. Similarly, rescue plans need to be put in place and rehearsed. This flyer and the MAIB’s investigation report are posted on our website: www.gov.uk/maib For all enquiries: Marine Accident Investigation Branch Email: maib@dft.gov.uk First Floor, Spring Place Tel: 023 8039 5500 105 Commercial Road Southampton SO15 1GH Publication date: December 2020 Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an such investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This safety flyer is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2020 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned.
FD06054 | 2018_英国_MAIB_two-catastrophic-engine-failures-one-resulting-in-a-fire-on-board-ro-ro-passenger-ferry-wight-sky__WightSky-Annexes.pdf.pdf
分类:06_境外及港澳台调查报告 | 年份:2018 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
Annex A Wightlink Ltd - Lymington Harbour Safe Operating Procedure
Annex B Cylinder Liner Cavitation Erosion On Diesel Engines
Page 1 of 2
This information is provided from the best available sources. However, AERA does not assume responsibility for data accuracy or consequences of its application. Members and others are not authorized to reproduce or distribute this material in any form, or issue it to their branches, divisions, or subsidiaries, etc. at a different location, without written permission.
© AERA Engine Builders Association. All rights reserved. Cylinder Liner Cavitation Erosion On Diesel Engines
The AERA Technical Committee offers the following information on cylinder liner cavitation erosion on diesel engines. This information should be considered anytime maintenance is being performed on a diesel engine.
The cavitation erosion that is found in diesel engines on the exterior side of the cylinder liners (wet) has been a theme of investigation by engine and corresponding component manufacturers, even though no definite manner of eliminating the problem has been found. See Figure 1.
Figure 1. Severely Eroded liner
The degree and size of erosion or decay as well as its form and distribution on the affected zones can vary from engine to engine and inclusively from cylinder to cylinder within the same engine.
The affected areas form vertical strips or patches sometimes in alignment with the thrust face of the piston within the cylinder, or also formed immediately over the top sealing ring of the liner. The erosion can penetrate the wall of the cylinder and permit the flow of antifreeze/coolant to the oil or vice-versa.
The cavitation erosion is caused by excess in harmonic vibrations of the engine and in some cases by loose fitting liners that result in a fast formation and implosion of small vapor bubbles within the coolant which attack the cylinders’ liner wall. The vibration in combination with collapsing bubbles produces an
Page 2 of 2
This information is provided from the best available sources. However, AERA does not assume responsibility for data accuracy or consequences of its application. Members and others are not authorized to reproduce or distribute this material in any form, or issue it to their branches, divisions, or subsidiaries, etc. at a different location, without written permission.
© AERA Engine Builders Association. All rights reserved. erosive effect over the surface of the liner’s exterior face. This occurs as the piston moves up and down within the cylinder causing vibration especially over the area of thrust in the cylinder liner.
We can say that the wall of the sleeve, which comes in contact with the coolant, quickly moves inwards and outwards striking these vapor formations. During this process, tiny bubbles are formed that implode or collapse violently producing shock waves against the liner’s wall. The results of these implosions at the impact area of the liner’s wall have been calculated to reach over 10,000º F with pressures of over 10,000 psi.
A specific material, which would prevent cavitation erosion within reasonable cost, has not yet been found. Nevertheless, some coatings can be applied to delay cavitation erosion until it is time for major engine repairs.
In order to reduce or prevent cavitation, manufacturer recommendations should be followed.
In many cases, cavitation can be avoided by reducing harmonic vibrations. For example, by making sure the injection complies with the manufacturer’s specifications, the engine’s speed is governed according to the manufacturer’s data and that the control functions. Also, do not underestimate the importance of correct clearances between liner and cylinder blocks; incorrect liner fit is a serious contributor to liner vibration resulting in cavitation erosion.
Engine manufacturers have specific additives for the coolant called SCA (supplementary cooling additive). These additives will form a protective coating over the cylinder liner, which is exposed to the coolant, therefore reducing cavitation damage. With time, additive concentration reduces in the system, consequently making it necessary to follow system maintenance recommendations in order to keep the adequate levels. The following points will be supplied:
- pH control to avoid corrosion
- Water hardness control to avoid mineral deposit formation
- Cavitation protection
In all cases, it is required that all manufacturer’s recommendations regarding coolants, base additives, additives, coolant filters as well as maintenance schedules should be strictly adhered to or followed at all times.
Annex C Event 1: number 6 connecting rod debris analysis
- UK0-0870
Exponent is an international consultancy with offices located in UK, Germany, Switzerland, USA, China and Hong Kong SAR 26th February, 2019 , Volvo Penta UK Subject: Volvo Penta – Wightlink Ferry Exponent Project No.: 1808759.UK0-0870 Dear , At your request, Exponent International Limited (Exponent) has carried out an analyses of the material located within the lubricating oil channel of connecting rod no.6, during the stripdown of a Volvo Penta D16 engine, serial number 1016027578. This stripdown was carried out in Warwick on the 29th January, 2019, by Volvo Penta staff in the presecence of representatives from the Marine Accident Investigation Branch, Lloyd’s Register, Wightlink and RK Marine as part of ongoing investigations into various engine failures which have occured onboard Wightlink ferries since August 2017. At an inspection on the 19th February, 2019 at an Exponent Labortory within The Natural History Museum, London, a connecting rod from the subject engine was visually inspected and samples collected from the lubrication channel by Dr. , an Exponent Materials Engineer. The lubrication channel openings and particles after collection are shown in FIGURE 1, FIGURE 2 and FIGURE 3, respectively. These particles were cleaned in an organic solvent (acetone) and prepared for scanning electron microscopy (SEM) and qualitative chemical analysis via energy dispersive x-ray spectroscopy (EDS). No analysis of the connecting rod material was performed.
Volvo Penta UK 26th February, 2019 Page 2
- UK0-0870
SEM is an analysis technique whereby high magnification images of a sample can be created by interrogating the surface with an electron beam. When the electron beam from an SEM interrogates a material surface, x-rays are released by the sample.1 These x-rays have a characteristic energy that depends on the element being interrogated. As a result, it is possible to determine what elements are present in a material through EDS.
In certain cases, it may be possible to estimate the relative amounts of each element present through a semi-quantitative analysis, but the sample must be specially prepared (i.e., flat and polished) to successfully perform this analysis;1 the size and morphology of the particles precluded such semi-quantitative analysis, thus the presence of particular elements in the particles is noted without specific information regarding the concentration of each element in the particles. Additionally, EDS does not provide information regarding the electronic state of the elements (i.e., what elements are bonded together), so specific information regarding the composition of the particles is not provided. Two particles, both approximately 1 mm3, were collected from the subject connecting rod and arbitrarily named “Particle 1” and “Particle 2.” Both particles were examined via SEM/EDS. Representative SEM images of the Particles 1 and 2 are shown in FIGURE 4 and FIGURE 5, respectively. The contrast in FIGURE 4 and FIGURE 5 represents compositional differences: brighter areas represent heavier elements (e.g., iron, Fe) while darker areas represent lighter elements (e.g., carbon, C). Note, the contrast is not uniform across all of the images, thus a particular shade of grey does not represent the same element image-to-image. Smaller, micron-scale particles were observed decorating the larger 1 mm3 particles. The larger 1 mm3 particles appear to consist mainly of carbon (C), while the smaller particles consist of a mix of aluminium (FIGURE 6), iron (FIGURE 7), nickel (FIGURE 7), copper (FIGURE 7) and lead (FIGURE 8). Traces of other elements, including but not limited to, phosphorus (P), calcium (Ca), sulphur (S) and silicon (Si) were also detected in various small particles decorating Particles 1 and 2.
1 ASM Handbook Volume 10 Materials Characterization, ASM International, Metals Park, OH USA, 1986, pp. 518 – 535.
Volvo Penta UK 26th February, 2019 Page 3
- UK0-0870
FIGURE 1. Representative photograph of the subject connecting rod.
FIGURE 2. Representative photographs of the lubrication channel openings in the subject connecting rod. Particles were visible in both openings.
Volvo Penta UK 26th February, 2019 Page 4
- UK0-0870
FIGURE 3. Representative photograph of the two particles collected from the subject connecting rod.
FIGURE 4. Representative SEM image of Particle 1.
Volvo Penta UK 26th February, 2019 Page 5
- UK0-0870
FIGURE 5. Representative SEM image of Particle 2.
Volvo Penta UK 26th February, 2019 Page 6
- UK0-0870
FIGURE 6. Representative EDS spectrum of a small particle decorating Particle 1. Aluminium (Al) was detected in this smaller particle.
Volvo Penta UK 26th February, 2019 Page 7
- UK0-0870
FIGURE 7. Representative EDS spectrum of a small particle decorating Particle 1. Iron (Fe), nickel (Ni) and copper (Cu) were detected in this smaller particle.
Volvo Penta UK 26th February, 2019 Page 8
- UK0-0870
FIGURE 8. Representative EDS spectrum of a small particle decorating Particle 2. Lead (Pb) was detected in this smaller particle.
Volvo Penta UK 26th February, 2019 Page 9 1808759.UK0-0870 To summarise, during the analyses of No.6 connecting rod lubricating oil channel taken from a Volvo Penta D16 engine, serial number 1016027578, carbon particles were detected surrounded by wear metal material. If we can be of further assistance in this matter, pelase do not hesistate to contact us. Your sincerely, Exponent International.
FD06055 | 2018_英国_capsize-and-sinking-of-fishing-vessel-solstice-with-loss-of-1-life_2018-20-_Solstice_A.pdf
分类:06_境外及港澳台调查报告 | 年份:2018 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
Annex A The Code of Practice for the Safety of Small Fishing Vessels mandatory equipment for decked vessels of less than 10m registered length
21 ANNEX 1.4 CODE OF PRACTICE FOR THE SAFETY OF SMALL FISHING VESSELS: CHECK LIST OF REQUIREMENTS: SEE ADDITIONAL GUIDANCE IN ANNEX 2 Equipment need not be MCA approved provided it is fit for its intended purpose. DECKED Vessels of less than 10 metres (L) “Decked vessels” means a vessel with a continuous watertight weather deck that extends from stem to stern and has positive freeboard throughout, in any condition of loading the vessel. Item Remarks/compliance Expiry/Service Date Liferaft(s) (for vessels of 7 metres (L) and over) - sufficient capacity for all persons on board vessel and appropriate for area of operation – See Annex 2 for guidance Lifejackets - 1 per person 2 Lifebuoys (1 with 18 metre buoyant line attached) or 1 Lifebuoy (fitted with 18 metre buoyancy line) +1 Buoyant Rescue Quoit 3 Parachute Flares 2 Hand-held Flares 1 Smoke Signal (buoyant or hand held) 1 Multi-purpose Fire Extinguisher (fire rating 5A/34B) 1 Multi-purpose Fire Extinguisher for oil fires (fire rating 13A/113B) Gas Detector 1 Fire Blanket (light duty) in galley or cooking area (if applicable) Fire Detectors 1 Fire Pump + Hose and 1 Fire Bucket and lanyard 1 Satellite EPIRB or Personal Locator Beacon(s) – 1 per person VHF Radio – DSC fixed or hand held Bilge Pump Bilge Level Alarm Approved Navigation Lights & Sound Signals Anchor and cable/warp Compass Waterproof Torch Medical Kit in accordance with The Merchant Shipping and Fishing Vessels (Medical Stores) Regulations 1995 No.1802 or any superseding regulations Radar Reflector CO Alarms for every enclosed space that has a fired cooking or heating appliance or where engine exhausts penetrate the wheelhouse or crew space Note: The checklist represents the minimum safety equipment requirements and owners should consider carrying additional safety equipment. It is recommended that if you carry the Satellite EPIRB, you also carry Personal Locator Beacons for each member of the crew, and if you carry Personal Locator Beacons, you also carry a Satellite EPIRB. The liferaft, which is mandatory for vessel of 7 metres (L) and over and strongly recommended for vessels under 7 metres (L), should be fitted in accordance with the manufacturer’s instructions. Coastguard Operations Centres maintain a listening watch only on VHF Channel 16. The primary means of distress and urgency alerting should be via VHF DSC. Substantial modifications or alterations affecting the vessel’s dimensions, structure or stability, the removal or repositioning of equipment, changes in the vessel’s mode of fishing and/or its gear or the fitting of additional equipment shall be investigated, prior to making any changes, to ensure that the vessel ensure that the vessel is stable for its intended purpose and/or will continue to comply with the stability requirements of this Code. In addition such modifications or alterations shall only be carried out after consultation and with the approval of the MCA.
Annex B Coastguard OMS Vessel overdue guidance
Vessel - Overdue Incidents involving reports of vessels missing or overdue The report may be made because the vessel failed to make a scheduled call or because of its non arrival at a port/harbour Overdue leisure vessels will often be reported by a concerned friend or relative Additional considerations need to be made for commercial vessels reported overdue Related Links SafeTrx EMSA Maritime Applications Portal SAD - Datum Area SAD - Datum Line Information Gathering Who - first informant details Who -vessel • Name, callsign and MMSI number • Type, size and description of vessel, CG66 • Radio • Mobile Phone / Communications devices • satcomms • EPIRB • SART • Other tracking device What - Activity or passage details • Departure point • Departure time • Car registration number • Activity • ETA Try to contact the vessel by any means possible as soon as practical Persons On Board • How many • · Profiles (e.g. age; sex, physical state etc.) • Experience, Familiarity with the area ls/might skipper be using SafeTrx trip monitoring or similar App? 0 Ask if there are any other potential sources of information, e.g. Clubs, Website 0 Look for latest entries on their Facebook / social media pages
Ask the first informant to call if they have any further information, or if the vessel re.turns Declare Phase and Follow Phase Actions Mission Conduct O could info from IMDatE be useful (e.g. FVMS) Vessel • Type and size • Capability and equipment • Condition (i.e. seaworthiness) • What means of communication are there on board mobile phone, VHF radio etc. • LSE Persons on board • How many • Crew composition • Profiles age, sex, health etc. • Experience Vessel Activity If fishing vessel A.overdue FVs often due to distress situation A.check FVMS via IMDatE When was vessel due in port or to market Is owner/agent aware or concerned - if 1st informant, probably something wrong Does FV have: • EPIRB • AIS • MAFF/DEFRA tracker (VMS - check IMDatE) Do crew have PLBs If making passage • Last known position • Type and size of vessel • Did the vessel depart • Is the ETA reasonable given environmental/ tidal conditions or could the vessel still be under pa·ssage Weather over passage Tidal conditions
• • Could the vessel have arrived or taken port en-route If not making passage • What activity was being undertaken • Location or area of activity • Radius of capability How far could the vessel get before running out of fuel or needing to return A1f the vessel departed from within another Ops Centre's area of responsibility, contact and liaise with the other Ops Centre A1f vessel using, or possibly using, SafeTrx app, contact the NMOC Search Plan 0 1s a search plan required • Alert and Distress Phase - Request a RIPA enquiry using a SPOC to try to obtain location information on any mobile phones/devices Consider • · Datum Area • Datum Line Environment • Poor weather may have caused the vessel to take shelter • Poor visibility may have caused the vessel to become lost or delayed • Strong head winds or flat calm (for sailing vessels) may cause delay • Tide -direction and rate over period A Forecast conditions and possible haza'rds along or near route must be considered when determining emergency phase and level of response 0 Contact On Call Duty Personnel - see Duty Rosters for contact details • Duty Controller • Duty Press Officer • Duty CPSO • Lloyds • DEFRA/SFPA • Local Fisheries Officer • MAIS • Send EU_SITREP to CERS • MCA Duty Surveyor (if applicable) • FCO (if applicable) • MCA Enforcement Branch (if applicable) Taskin Facilities
• • • • • Phases • Distress • Alert • Uncertainity Mission Conduct • • • • • Welfare • Welfare • Blood Borne Viruses • TRiM Prdcedure Conclusion • • Revision: 2.0 - Published:
Annex C Safety Flyer to the Fishing Industry
SAFETY FLYER TO THE FISHING INDUSTRY Fishing vessel Solstice, capsize and sinking resulting in the loss of one life, 26 September 2017 Narrative At 1938 on 26 September 2017, the 9.9m fishing vessel Solstice (Figure 1) capsized in calm weather conditions about 7 miles south of Plymouth. The skipper and crewman were rescued from the vessel’s upturned hull (Figure 2) about 5½ hours later, but the vessel’s owner was trapped and drowned in the wheelhouse. Solstice later sank. The scallop dredger had recently been modified to operate as a stern trawler and its owner, skipper and crewman were in the process of hauling their second catch of the day on board when the capsize occurred. The net’s cod-end was full of fish, moss and sand, and started to move uncontrollably along the transom as the vessel rolled in the light swell. The capsize was rapid, and the crew did not have time to raise the alarm before they entered the water. As the vessel was not equipped with an emergency position indicating radio beacon (EPIRB) and the crew did not carry personal locator beacons (PLBs), they were wholly reliant on family and friends realizing they were overdue and alerting the coastguard. Figure 1: Solstice Figure 2: Upturned hull floating on surface (photograph taken the following morning)
Safety lessons • Solstice capsized because it did not have sufficient transverse stability to safely lift the contents of its net on board over the stern. This was primarily because the weight in the net was excessive and the height of the lifting point at the stern was high (Figure 3). • The dangers of modifying small fishing vessels and changing fishing methods are well known and the consequences on stability are often fatal. However, the vessel had no stability data and a safe method of fishing had not been developed. • It is important to have a clear understanding of your vessel’s stability, but the impact that fishing methods have on stability cannot be emphasized enough. Talk to your local fishing vessel surveyors and seek expert advice if necessary before commencing any structural modifications, but especially modifications to change or alter the method of fishing. • It was obvious that the weight in the net was excessive, but the crew remained determined to lift the catch on board. No catch, no matter how valuable, is worth a life. Stop and seriously consider your options and, ultimately, be prepared to let it go. • The survivors were extremely fortunate that Solstice’s upturned hull remained afloat as they were not wearing lifejackets when they entered the water, and it took over 5 hours for them to be found and rescued. Personal flotation devices should always be worn when working on deck and emergency use lifejackets should be readily available. • It was also fortunate that the survivors were found. Their friends and family did not know where they had been fishing and, because Solstice was not equipped with an automatic identification system (AIS) transceiver, the coastguard could not identify the vessel’s last recorded position. The carriage of an EPIRB and/or PLBs would have resulted in an immediate and location- focused emergency response. The carriage of an AIS transceiver in this case would have been of invaluable benefit. This safety flyer and the MAIB’s investigation report are on our website: www.gov.uk/maib For all enquiries: Marine Accident Investigation Branch Email: maib@dft.gov.uk First Floor, Spring Place Tel: 023 8039 5500 105 Commercial Road Southampton SO15 1GH Publication date: 6 December 2018 Figure 3: Solstice scallop dredging four weeks before the accident Lifting point
FD06056 | 2018_英国_engine-failure-and-subsequent-fire-on-ro-ro-cargo-vessel-finlandia-seaways-with-1-person-i.pdf
分类:06_境外及港澳台调查报告 | 年份:2018 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
ACCIDENT REPORT ACCIDENT REPORT Report on the investigation of the engine failure and fire on board the ro-ro cargo vessel Finlandia Seaways resulting in injury to one crewman 11 miles east of Lowestoft 16 April 2018 SERIOUS MARINE CASUALTY REPORT NO 2/2021 FEBRUARY 2021
The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2021 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. All MAIB publications can be found on our website: www.gov.uk/maib For all enquiries: Marine Accident Investigation Branch First Floor, Spring Place 105 Commercial Road Southampton SO15 1GH United Kingdom Email: maib@dft.gov.uk Telephone: +44 (0) 23 8039 5500 Press enquiries during office hours: 01932 440015 Press enquiries out of hours: 020 7944 4292
CONTENTS GLOSSARY OF ABBREVIATIONS AND ACRONYMS SYNOPSIS 1 SECTION 1 - FACTUAL INFORMATION 2 1.1 Particulars of Finlandia Seaways and accident 2 1.2 Narrative 3 1.2.1 Passage from Zeebrugge 3 1.2.2 The engine failure and subsequent fire 3 1.2.3 Emergency response 4 1.2.4 Engine room fire damage 12 1.3 Crew 12 1.4 Environmental conditions 13 1.5 Finlandia Seaways 13 1.6 Main engine 13 1.6.1 Overview 13 1.6.2 Engine design and key components 14 1.6.3 Engine condition monitoring and protection systems 16 1.6.4 Post-fire inspection 17 1.6.5 Engine room alarms 21 1.6.6 Planned maintenance 21 1.6.7 Outsourcing of main engine work 22 1.7 Diesel Service Group UAB 22 1.7.1 Overview 22 1.7.2 Certification 22 1.8 Connecting rod piston pin bush renewal 23 1.8.1 MAN guidance and procedure 23 1.8.2 Diesel Service Group guidance and procedure 24 1.9 Engine manufacturer’s post-failure engine inspection and guidance 27 1.9.1 Engine inspection and failure mode analysis 27 1.9.2 Botnia Seaways 31 1.9.3 Engine design modifications and updates 33 1.10 Metallurgical analysis 33 1.11 External oversight 34 1.12 Emergency response 36 1.12.1 Carbon dioxide fixed fire-extinguishing system 36 1.12.2 Means of escape 37 1.12.3 Emergency escape breathing devices 39 1.12.4 Voyage data recorder recovery 40 1.13 Previous/similar accidents 40 1.13.1 Thetis D 40 1.13.2 Power station, Spain 41 SECTION 2 - ANALYSIS 42 2.1 Aim 42 2.2 Accident overview 42 2.3 Engine failure 42 2.3.1 Sequence of events 42 2.3.2 Identification of the component failure 43 2.3.3 Failure mode 43
- 4 Fracture mechanism
44 2.4.1 General 44 2.4.2 Fatigue fracture 44 2.4.3 Notch effect and toughness 44 2.4.4 Localised heating 46 2.4.5 Inspection and analysis 47 2.5 Maintenance management 47 2.5.1 Overview 47 2.5.2 Connecting rod small end overhaul process 48 2.5.3 Rotation of connecting rod small ends 48 2.5.4 Diesel Service Group quality control 49 2.5.5 DFDS quality control 50 2.5.6 Classification Society oversight 50 2.6 Emergency response 51 2.6.1 Overview 51 2.6.2 Carbon dioxide bottle identification 51 2.6.3 Effective numbers and distribution of EEBDs 52 2.6.4 VDR 52 SECTION 3 - CONCLUSIONS 53 3.1 Safety issues directly contributing to the accident that have been addressed or resulted in recommendations 53 3.2 Safety issues not directly contributing to the accident that have been addressed or resulted in recommendations 54 3.3 Other safety issues not directly contributing to the accident 54 SECTION 4 - ACTION TAKEN 55 4.1 MAIB actions 55 4.2 Actions taken by other organisations 55 SECTION 5 - RECOMMENDATIONS 57 FIGURES Figure 1: Finlandia Seaways Figure 2: Engine room purifier room Figure 3: Purifier room door Figure 4: Access to ECR, CCR from vehicle deck Figure 5: Control station for the engine room fuel systems’ quick-closing valves Figure 6: Purifier room and engine room tween deck (shaded blue) with 3/E’s escape route Figure 7: Elevation showing the primary escape route from the purifier room to the main vehicle deck and the secondary escape route taken by the third engineer
Figure 8: Escape route vertical ladder and safety chains Figure 9: Upper vehicle deck Figure 10: CO2 remote release station Figure 11: CO2 bottle room Figure 12: Fire damage to upper engine room (looking forward) Figure 13: MAN 48/60 engine (engine shown 14V48/60B) Figure 14: Connecting rod assembly Figure 15: B5 small end with piston pin Figure 16: Crankcase oil mist detector Figure 17: Port side main engine Figure 18: Starboard crankcase damage at B5 Figure 19: Section of A5 connecting rod (after removal from engine room) Figure 20: B5 components on starboard side deck plates Figure 21: A5 cylinder viewed from engine sump Figure 22: B5 liner (looking up to inlet/exhaust valves from engine sump) Figure 23: Diesel Service Group workshop and milling machine (inset) Figure 24: Diesel Service Group: small end piston pin bearing bush renewal procedure Figure 25a: A5 small end upper half Figure 25b: A5 small end fatigue fracture Figure 25c: A5 looking forward and fatigue fracture Figure 26: MAN – Finlandia Seaways’ small ends investigation Figure 27: Botnia Seaways small end heat damage (circled) Figure 28: Carbon dioxide bottle operating valve Figure 29: Distribution of EEBDs in or near to the engine room and escape routes Figure 30: Stress/strain curve Figure 31: Crack propagation Figure 32: Plastic protractor under polarising light showing stress concentration
TABLES Table 1: Key alarms relating to the engine failure and engine room fire Table 2: MAN’s planned maintenance schedule Table 3: A5 small end overhauls and inspections Table 4: Finlandia Seaways’ main engine connecting rods, including small end damage Table 5: Lloyd’s Register Component Survey List ANNEXES Annex A MAN inspection report Annex B MAN customer information no. 344/2015 Annex C The Test House (Cambridge) Ltd metallurgical report Annex D Lloyd’s Register Examination of Surveyable Machinery Items by Chief Engineers
GLOSSARY OF ABBREVIATIONS AND ACRONYMS
APT
Annual Performance Test
bar
metric unit of pressure: 1bar is equal to 100,000 pascals
BSU
Bundesstelle für Seeunfalluntersuchung CCR
Cargo control room C/E
Chief engineer
C/O
Chief officer CO2
Carbon dioxide CPP
Controllable pitch propeller
CSM
Continuous Survey Machinery
DFDS
DFDS Seaways AB-Lithuania
DSG
Diesel Service Group UAB ECR
Engine control room
EEBD
Emergency escape breathing device Hz
Hertz IMO
International Maritime Organization kg
kilogramme kW
kilowatt
LMSA
Lithuanian Maritime Safety Administration LR
Lloyd’s Register
LTSA
Lithuanian Transport Safety Administration
MAN
MAN Diesel and Turbo SE renamed MAN Energy SE on 26/6/2018
MAN PrimeServ
Brand name for MAN’s aftersales and maintenance service division mbar
millibar
MCA
Maritime and Coastguard Agency
MGN
Marine Guidance Note mm
millimetre nm
nautical miles
OMD
Oil mist detector
OOW
Officer of the watch Piston pin bush
Connecting rod small end piston pin bearing bush
PMS
Planned Maintenance System
RINA
Registro Italiano Navale
RMRS
Russian Maritime Register of Shipping rpm
revolutions per minute
SOLAS
International Convention for the Safety of Life at Sea 1974, as amended
TAIID
Lithuanian Transport Accident and Incident Investigation Division
TTH
The Test House (Cambridge) Ltd
UPS
Uninterruptible power supply
UTC
Universal Co-ordinated Time V
volt
VDR
Voyage data recorder VHF
Very high frequency
2/E
Second engineer 3/E
Third engineer TIMES: all times used in this report are UTC unless otherwise stated
1 SYNOPSIS At 2003 on 16 April 2018, the Lithuanian registered ro-ro cargo vessel Finlandia Seaways suffered a catastrophic main engine failure that caused serious structural damage to the engine and a fire in the engine room. The vessel’s third engineer, who was on duty in the engine room at the time, suffered serious smoke-related lung, kidney and eye injuries during his escape. Finlandia Seaways was 11nm east of Lowestoft on a regular voyage from Zeebrugge to Rosyth when one of the main engine’s connecting rods broke. Several of the engine’s major internal rotating components were thrown through the side of the crankcase into the engine room, and a short but intense fire occurred. Within 20 minutes the crew had conducted a muster, sealed the engine room, activated its carbon dioxide fixed fire-fighting system and extinguished the fire. The third engineer was recovered by coastguard helicopter to Norfolk and Norwich hospital for medical care, and made a successful recovery. The MAIB’s technical investigation was carried out with support of the Lithuanian Transport Accident and Incident Investigation Division and the engine manufacturer, MAN Diesel and Turbo SE. The investigation identified that a fracture of the connecting rod small end had led to the sudden failure of the main engine. The investigation also found that the method used to replace the connecting rod small end piston pin bearing bushes by the vessel manager’s maintenance support contractor had introduced stress raisers that signficantly increased the likelihood of crack initiation and fatigue failure. Other factors that contributed to the engine failure included: standards of maintenance management; lack of appreciation of the importance of following the engine manufacturer’s instructions for the removal and refitting of the piston pin bearing bushes; and external oversight of the engine maintenance process. With regard to the emergency response, although the carbon dioxide fire-fighting system was activated successfully, the third engineer was fortunate to have survived given that there were no emergency escape breathing devices on his escape route. In common with other accidents in which carbon dioxide has been released following a fire, the inability to confirm which gas bottles had discharged hampered re-entry to the engine room. In addition to this, the voyage data recorder did not record the incident due to the uninterruptible power supply failing. On 27 July 2018, the MAIB and the Lithuanian Transport Accident and Incident Investigation Division wrote to MAN Diesel and Turbo SE and the vessel’s classification society recommending that they provide technical advice to Finlandia Seaways’ operator to reduce the likelihood of a similar accident occurring in the future. In response, Finlandia Seaways’ sister vessel was withdrawn from service and its engine connecting rods removed and replaced. In addition to many actions taken by stakeholders as a result of this accident, further recommendations aimed at addressing the safety issues raised in this report have been made to the vessel operators, DFDS Seaways AB-Lithuania and its engine maintenance support contractor, Diesel Service Group.
2 SECTION 1 - FACTUAL INFORMATION 1.1 PARTICULARS OF FINLANDIA SEAWAYS AND ACCIDENT SHIP PARTICULARS Vessel’s name Finlandia Seaways Flag Lithuania Classification society Lloyd’s Register IMO number/fishing numbers 9198721 Type Ro-ro cargo vessel Registered owner DFDS Seaways AB-Lithuania Manager(s) DFDS Seaways AB-Lithuania Construction Steel Year of build 2000 Length overall 162.58m Gross tonnage 11530 Minimum safe manning 13 Authorised cargo Freight vehicles VOYAGE PARTICULARS Port of departure Zeebrugge Port of arrival Rosyth Type of voyage International Cargo information A mixture of heavy goods vehicles, containers, cars, campervans and caravans Manning 19 Passengers 4 MARINE CASUALTY INFORMATION Date and time 16 April 2018 at 2003 (2203 ship’s time) Type of marine casualty or incident Serious Marine Casualty Location of incident 11 miles east of Lowestoft Place on board Engine room Injuries/fatalities One injury Damage/environmental impact Main engine structural damage; fire damage in engine room Ship operation On passage Voyage segment Mid-water External & internal environment South-westerly wind, slight sea Persons on board 23
3 1.2 NARRATIVE 1.2.1 Passage from Zeebrugge At 1445 on 16 April 2018, Finlandia Seaways’ (Figure 1) main engine was started in preparation for leaving port. On duty in the engine room were the chief engineer (C/E), second engineer (2/E) and an electrician. The vessel’s relief C/E was also in the engine room. At 1510, engine control was passed to the bridge and, at 1545, the vessel departed Zeebrugge on passage to Rosyth, Scotland. At 1600, the on watch 2/E was relieved by the third engineer (3/E) and the former left the engine room. At 1610, the vessel cleared Belgium’s 12nm coastal limit and the engineers began to change over the engine fuel supply from low sulphur marine diesel oil to heavy fuel oil. This was completed at 1642 and, by 1800, the C/E, relief C/E and electrician had all left the engine room. The on watch 3/E monitored machinery operating parameters from the engine control room (ECR) and undertook hourly inspection rounds of the engine room. Figure 1: Finlandia Seaways The ro-ro cargo vessel Finlandia Seaways Image courtesy of www.shipspotting.com 1.2.2 The engine failure and subsequent fire At about 2000, the 3/E left the ECR and commenced his hourly rounds of the engine room and machinery spaces. Shortly after entering the purifier room (Figure 2), he heard loud metallic knocking sounds coming from the engine room. At the same time, powerful vibrations were being felt on the bridge by the officer of the watch (OOW), who immediately checked the propeller pitch angle and main engine speed gauges. The OOW saw that both gauges were fluctuating and immediately reduced the propeller pitch from 60% to 25%. He then saw that the fuel consumption meter was also fluctuating and giving abnormal readings, while various engine warning lights were illuminated.
4 Figure 2: Engine room purifier roomThe purifier room on board Finlandia Seaways The 3/E opened the purifier room door, looked out into the engine room and saw smoke rising from the port forward end of the main engine. The noise and vibration levels rapidly increased and, sensing danger, the 3/E ran back into the purifier room and crouched behind one of the purifiers. Almost immediately, at 2003, there was a loud bang and flames flashed past the open purifier room door (Figure 3) and the space filled with thick black smoke. The ship blacked out1, but within seconds the emergency generator cut-in and the emergency lighting came on. Despite this, the smoke in the engine room had reduced the 3/E’s visibility to almost nothing. 1.2.3 Emergency response The master, who had been alerted by the strong ship vibrations, arrived on the bridge as the blackout occurred. The fire alarm system had been activated and the bridge alarm panel indicated that all zones within the engine room were affected. The master immediately took command and put the vessel’s controllable pitch propeller (CPP) to zero pitch. He then instructed the OOW to sound the general alarm and make an intercom broadcast stating that it was a genuine emergency and that the crew should go to their muster stations. At about the same time, the chief officer (C/O) arrived on the bridge and reported that he had seen smoke emitting from the funnel. 1 The sudden and total failure of the ship’s main electrical power supply.
5 Figure 3: Purifier room doorOpened door to the purifier room with some heat damage visible Like the master, many of the crew members had been alerted by the ship vibrations and had already begun to react. The C/E had noticed that the main engine’s No.A5 cylinder exhaust gas temperature deviation alarm had activated on his cabin alarm panel. He initially thought it could be related to a fuel system problem. As he left his cabin for the engine room, the blackout occurred. The C/E continued aft to the port side of the main vehicle deck and opened the engine room access door. He was met by significant smoke and some heat. He shouted out for the 3/E but heard no reply and was forced back onto the vehicle deck. He then tried to enter the ECR via the cargo control room (CCR) (Figure 4) and was again faced with smoke and heat. There was no sign of the 3/E. The C/E called the bridge from the steering gear space and informed the master of the fire in the engine room. He then operated the engine room fuel systems’ quick-closing valves (Figure 5) and fuel pump emergency stops from the control box adjacent to the ECR. Heat damage to door
6 Figure 4: Access to ECR, CCR from vehicle deck Ship schematic showing the access routes from the vehicle deck to the engine and cargo control rooms Access from ECR to engine room Engine control room Cargo control room
7 Figure 5: Control station for the engine room fuel systems’ quick-closing valves Opened control box containing the engine room fuel systems’ quick-closing valves In the purifier room, the 3/E realised that his nearest escape route would take him past the main engine at cylinder head level and decided to use the secondary escape route at the aft end of the engine room (Figure 6). He took a deep breath and then left the purifier room. On entering the dense black smoke, the 3/E ducked underneath the main engine exhaust gas trunking and ran aft past the two auxiliary generators. The escape route (Figure 7) led him to the first of three vertical ladders (Figure 8). When he climbed the first ladder, he struggled to get past the ladder platform guard rail safety chains and fell back down the ladder three times, losing his torch in the process, before making good his escape. The vessel’s four passengers were taken to their assembly point on the upper vehicle deck and an initial crew muster was attempted at the port lifeboat. Some of the crew involved in the fire-fighting effort reported in via hand-held radios. The engine room fire party, which had arrived on the upper vehicle deck and was running out fire hoses, reported the 3/E missing. A second muster took place on the upper vehicle deck, where the 2/E and motorman had already begun to shut the engine room fire flaps. At 2013, the 3/E escaped from the engine room through the funnel casing weathertight door onto the upper vehicle deck (Figure 9). He then collapsed onto the deck, gasping for breath and struggling to see. The 2/E saw the 3/E collapse and went to help him. The 2/E radioed the bridge and informed the master that the 3/E required medical assistance. At 2015, on instruction from the master, the OOW contacted Humber Coastguard and requested a helicopter.
8 Figure 6: Purifier room and engine room tween deck (shaded blue) with 3/E’s escape route Ship schematic showi ng third engineer's se condary escape route thro ugh the purifier roo m and engine room
9 Figure 7: Elevation showing the primary escape route from the purifier room to the main vehicle deck and the secondary escape route taken by the third engineer
(Green: primary escape route | Blue: secondary escape route) Ship schematic showing the elevations for the primary and secondary routes FWD AFT Mezzanine deck Upper vehicle deck
10 Figure 8: Escape route vertical ladder and safety chains Vertical ladder leading to a platform with guard rails and safety chains Safety chain Ladder Platform Guard rails Figure 9: Upper vehicle deck The upper vehicle deck on Finlandia Seaways with the funnel casing weathertight door opened Funnel casing weathertight door
11 With confirmation that the 3/E had been found, all crew and passengers accounted for, the fire flaps closed and the engine room fuel supply isolated, the C/E advised the master to release the engine room’s carbon dioxide (CO2) fixed fire-extinguishing system. The master then called the 2/E and ordered him to operate the CO2 system for the engine room. The 2/E and the second officer went to the CO2 remote release station (Figure 10) on the forecastle deck and, at about 2020, released the CO2 into the engine room. The 2/E then went down to the main deck and entered the CO2 bottle room (Figure 11). He found that the control lever for the engine room had operated correctly and that the CO2 pipework had frosted. He also noted that the main CO2 supply line pressure gauge was indicating about 20bar pressure, and a short time later he saw it reduce to zero. Figure 10: CO2 remote release stationCO2 remote release station on the forecastle deck Figure 11: CO2 bottle roomCO2 bottle room on the main deck At 2027, Humber Coastguard tasked rescue helicopter R912 based at Humberside to evacuate the injured 3/E. Two warships were also in the vicinity and were tasked to close on Finlandia Seaways and stand-by if required. While the medical team continued to provide medical support to the 3/E, other crew members were tasked to monitor engine room boundary temperatures. This was initially carried out by using their hands and, latterly, with fridge thermometers. Temperatures were measured and logged regularly and appeared to reduce over time. The master instructed the bosun to drop the port anchor; one shackle ran out before it jammed. The starboard anchor was then released and it, too, initially jammed. However, with assistance from the bosun it ran out and held the ship with four shackles.
12 At 2203, after diverting to refuel, R912 arrived at Finlandia Seaways. At 2247, the 3/E was recovered into the helicopter and taken to Norfolk & Norwich hospital, where he received medical care for smoke-related lung, kidney and eye injuries. At 2337, Finlandia Seaways’ master advised Humber Coastguard that the fire situation had been stabilised. Finlandia Seaways was initially towed to the Hawke anchorage on the River Humber. A further tow was arranged, with the vessel arriving in Immingham on 20 April 2018, where it was boarded by the Humberside Fire & Rescue Service to confirm that the engine room fire had been extinguished. 1.2.4 Engine room fire damage Fire damage was sustained primarily at the tween deck level in the engine room, with severe heat damage to the upper part of the main engine and engine room deckhead (Figure 12). Most of the heat damage was sustained around the main engine cylinder heads, and to auxiliary equipment on the periphery at the forward end of the engine room. Further aft, towards the two auxiliary generators, smoke damage was the major contributor. On the bottom plates, the main area of heat damage was at the port forward engine room access door and the adjoining stairwell. Impact damage to the access door caused by the components ejected from the main engine had enabled heat and smoke to enter the stairwell, which had then funnelled up the next two decks to the ECR. Figure 12: Fire damage to upper engine room (looking forward) Severe heat damage to the upper part of the main engine and engine room deckhead (looking forward) 1.3 CREW Finlandia Seaways was crewed by 19 Lithuanian nationals, one of whom had just joined the vessel in Zeebrugge as the relief C/E. Crew members normally worked 4 weeks on, 4 weeks off; or 6 weeks on, 6 weeks off. Port side mezzanine walkway Main engine Deck head Cylinder head A1
13 Although Finlandia Seaways had an unattended machinery space2 notation, the vessel’s engine room was normally manned at all times with the 2/E and 3/E undertaking 4 and 6-hour watches in rotation3. The C/E, electrical engineer and motorman were day workers and typically worked from 0800 to 1800. 1.4 ENVIRONMENTAL CONDITIONS At the time of the accident the wind was southerly, force 4-5, the sea was slight with fair weather and the visibility was good. 1.5 FINLANDIA SEAWAYS Finlandia Seaways was a Lithuanian registered roll-on roll-off cargo vessel. It was owned by DFDS Seaways AB-Lithuania (DFDS) and operated by DFDS A/S. It was built in 2000 and purchased, along with its sister vessel Botnia Seaways, by DFDS in 2009. When first acquired, Finlandia Seaways and Botnia Seaways were named Tor Finlandia and Tor Botnia. The vessels were renamed in 2012. Finlandia Seaways had provided a regular service on the Zeebrugge to Rosyth route since 2009. It had been classed by Lloyd’s Register (LR) since new and, at the time of the accident, its certificate of class was valid until 9 August 2020. DFDS A/S is a Danish shipping and logistics company. At the time of the accident it operated 28 vessels on passenger and freight services on 24 routes across northern Europe and within the Mediterranean Sea. DFDS Lithuania’s management and technical teams were based in Klaipeda, Lithuania. 1.6 MAIN ENGINE 1.6.1 Overview The vessel’s main engine was a 12,600kW MAN Diesel and Turbo SE (MAN) 12V 48/60 single-acting medium speed four-stroke diesel engine (Figure 13). It had two banks of six cylinders arranged in a “V” configuration with two turbochargers, one per bank. The ‘48/60’ referred to the bore of the cylinders and the stroke of the pistons in centimetres. The engine operated at a fixed speed of 500rpm, with load changes controlled by fuel input. It was connected via a flexible coupling to a single reduction gearbox, which drove a single CPP at an operating speed of 155rpm. The engine also drove a 400V, 1,500kW, 50Hz electrical alternator. At the time of the accident, the engine had a total of 110,662 running hours. The MAN 12V 48/60 engine was commonly used in both ship propulsion and shoreside power generation systems. 2 Unattended machinery spaces are required to have levels of automation that allow them to be periodically unattended. Typically, outside normal daily working hours. If there is a malfunction in any machinery, or any operating parameters are exceeded, an alarm will be sounded in the duty engineer’s cabin and other communal accommodation areas. It is then the duty engineer’s responsibility to investigate. 3 Engine room watch routine – 2/E: 0000-0400 and 1200-1800; 3/E: 0400-0800 and 1800-0000.
14 Figure 13: MAN 48/60 engine (engine shown 14V48/60B) Catalogue image of Finlandia Seaways's main engine model 1.6.2 Engine design and key components The engine design comprised a single-piece cast iron crankcase. The cylinder liners were separated from each other and were mounted in the engine frame, and the crankshaft was underslung. The crankcase was fitted with crankcase explosion relief valve doors, two per crank throw, i.e. one on each side. The crankcase relief valve operating pressure was 50mbar. The forged crankshaft had two counterweights per crankpin journal to compensate for the oscillating masses. The counterweights were held in place by anti-fatigue bolts. All the major bolting arrangements within the crankcase were hydraulically tensioned. The cylinders were numbered 1 to 6 from aft to forward and labelled “A” for the port side bank and “B” for the starboard side bank. Each cylinder bank had a camshaft, which operated four valves per cylinder head and the fuel injection pumps. A cylinder and its associated valves, piston and con rod was referred to as a ‘unit’, i.e unit A1, unit B1 etc. The piston connecting rods were cast in one piece. During manufacture, the connecting rod shank was cut below the small end eye, flanged and bolted together. This was to facilitate piston removal without the need to remove the connecting rod big end bearing. The shank’s flanged connection was the weakest part of the connecting rod assembly (Figure 14). The connecting rod small ends were stamped with the manufacturer’s unique identification code numbers (e.g. COC 1234) and LR identification numbers for survey purposes. A one-piece piston pin bearing bush (piston pin bush4) was 4 Connecting rod piston pin bearing bushes are also often referred to as small end bushes. Camshaft casing Crankcase doors Crankcase Oil tray Cylinder block Cylinder heads A1
15 installed into the eye of the small end (Figure 15). The surface finish of the inner face of the small end eye was prepared during manufacture by shot-peening5 to reduce the potential for fatigue fractures developing under high operational loads. The masses of key rotating and oscillating components within the engine were: piston – 337kg; piston pin – 102kg; connecting rod – 655kg; and crankshaft counterweight – 525kg. 5 Shot peening is a surface cold worked process of bombarding the material with small high velocity spherical metal particles (shot), which introduces residual compressive stress. Figure 14: Connecting rod assembly Drawing of a connecting rod assembly
16 Figure 15: B5 small end with piston pinSmall end with bearing bush and piston pin highlighted 1.6.3 Engine condition monitoring and protection systems The engine was equipped with the following crankcase monitoring systems:
● main bearing temperature monitoring system,
● splash oil monitoring system, and
● oil mist detector (OMD). The crankshaft bearing temperature monitoring system used temperature sensors that were fitted in the underslung crankshaft main bearings. The sensors transmitted electronic signals to the engine safety system. The splash oil monitoring system measured and compared the oil temperature dripping from the connecting rod bearings. Both temperature monitoring systems could trigger an alarm and automatically shut down the engine. The OMD was manufactured by Schaller Automation and was fitted on the starboard side of the engine crankcase (Figure 16). The OMD measured and compared the oil vapour concentrations present in each crankcase compartment and provided an audible and visual alarm when anomalies were identified. The OMD could also trigger an engine shutdown if high levels of mist developed in one or more compartments. Bearing bush Piston pin
17 Figure 16: Crankcase oil mist detectorOil Mist Detector fitted on the starboard side of the engine crankcase High oil mist concentrations are created in a crankcase by the presence of hot spots, which cause oil to evaporate and then form a mist when they start to condense. The ignition of the oil mist can lead to violent crankcase explosions, the consequence of which can be severe, including death and serious injury to crew, and extensive engine damage. 1.6.4 Post-fire inspection Finlandia Seaways’ main engine suffered substantial structural and component damage during its failure. The engine crankcase structure was ruptured on the port and starboard sides of units five and six, with crankcase explosion relief valve doors and large sections of the crankcase casting being propelled several metres across the floorplates (Figures 17 and 18). A5’s connecting rod (Figure 19), the lower half of its piston and its crankshaft counterweight had been ejected through the starboard side of the crankcase. The connecting rod had separated at its small end eye, shank flange and big end bolted connections. The big end bearing cap was found at the forward end of the engine room deck plates on the port side. B5’s connecting rod and its piston had also been ejected from the crankcase and were found on the starboard deck plates (Figure 20), the connecting rod assembly having separated at its bolted shank flange. The broken upper half of A5’s small end, and B5’s big end lower half, were found in the engine room starboard bilge.
18 Figure 17: Port side main enginePort side main engine showing broken crankcase units and the post-accident position of the crankcase door Broken crankcase units 5 and 6 Crankcase door Figure 18: Starboard crankcase damage at B5 Starboard side of crankcase units five and six showing damage and debris in the sump Broken crankcase Crankshaft big end bearing pin A5 and B5 Debris in sump
19 Figure 19: Section of A5 connecting rod (after removal from engine room) Connecting rod separated at its small end eye, shank flange and big end bolted connections Figure 20: B5 components on starboard side deck plates Connecting rod and piston on starboard side deck plates The upper part of A5’s piston and its piston pin6 remained in the upper section of the cylinder liner (Figure 21); the lower section of the cylinder liner had shattered and dropped into the sump. Although badly damaged at its lower end, B5 cylinder liner did not suffer the same level of damage as A5 (Figure 22). Impact damage had occurred to the crankshaft at number five crankpin journal and the crankpin webs. The camshaft covers for both banks had become detached and the A-bank camshaft had also been partially displaced. 6 Piston pins are also widely referred to as gudgeon pins. B5 piston B5 conrod small end
20 Figure 21: A5 cylinder viewed from engine sump Upper part of A5’s piston and its piston pin shown in situ in the upper section of the cylinder liner Piston Piston pin Upper section of liner Figure 22: B5 liner (looking up to inlet/exhaust valves from engine sump) Broken B5 cylinder liner, looking up to the cylinder head and four valves Broken liner Cylinder head and valves
21 1.6.5 Engine room alarms During the engine failure and ship blackout many alarms activated in the engine control room and on the bridge. A summary of key alarms is listed in Table 1 below. Table 1: Key alarms relating to the engine failure and engine room fire Ship’s time (UTC+2) Alarm Alarm State 2203:21 Main engine crankcase oil mist High 2203:22 Main bearing 6 high temperature Sensor (Fault) 2203:22 Main engine splash oil monitor Fail 2203:24 Lube oil pump stand-by Start 2203:25 Main engine slowdown 2203:28 Main bearing 5 high temperature Sensor (Fault) 2203:28 Main bearing 7 high temperature Sensor (Fault) 2203:32 Main bearing 1 high temperature Sensor (Fault) 2203:32 Main bearing 2 high temperature Sensor (Fault) 2203:32 Main bearing 3 high temperature Sensor (Fault) 2203:32 Main bearing 4 high temperature Sensor (Fault) 2203:35 Fire alarm 2203:43 Cylinder A5 exhaust gas out temp Low 1.6.6 Planned maintenance The main engine planned maintenance work on board Finlandia Seaways was conducted in accordance with the schedules contained in the vessel’s electronic planned maintenance system (PMS). The PMS schedules were based on MAN’s engine running hours maintenance schedule (Table 2). Table 2: MAN’s planned maintenance schedule Description Hours Check one big end bearing 6,000 Remove, clean/check one piston 6,000 Check all pistons 12,000 Remove one piston pin 12,000 Disassemble one piston 12,000 Replace all big bearing shells and small end bearing bushes 36,000
22 Day to day defect maintenance and minor planned maintenance work on the main engine were carried out by the vessel’s engineers. This included the replacement of fuel injectors and fuel pump servicing. In addition, the engineers conducted routine inspections of the engine’s crankcase, camshafts, bearings, liners, bolt security and lubricating oil supply lines. They also took regular fuel and lubricating oil samples and sent them ashore for analysis. Major maintenance work, such as piston removal, inspection and overhaul was usually carried out by shore contractors during maintenance layover periods at Rosyth. The attendance of the shore contractors was facilitated by the vessel’s technical superintendents. The maintenance requirements for the main engine connecting rods and pistons were set out in the same PMS schedules, under the headings No.1 Unit A; No.1 Unit B, etc. To assist with piston overhauls and enable swifter maintenance period turnarounds for Finlandia Seaways and Botnia Seaways, DFDS held six spare small ends. To help monitor small end running hours, the vessels’ C/Es recorded their running hours, based on their COC number, on a separate spreadsheet. 1.6.7 Outsourcing of main engine work Since taking operational control of Finlandia Seaways and Botnia Seaways in 2009, DFDS had outsourced most of the vessels’ main engine repair work to the ship repair company Diesel Service Group UAB (DSG). Initially, DSG was tasked to work alongside MAN service engineers but, over time it was contracted to carry out increasing amounts of the routine main engine work alone. MAN was used only to do complex tasks that required specialist tools and specific expertise. Recent work items undertaken on board Finlandia Seaways by MAN included replacing a camshaft in 2016, replacing the Vulcan shaft coupling and overhauling the engines’ oil and freshwater pumps. DFDS had held discussions with DSG to ascertain its capability to undertake specific tasks. In this respect, DFDS considered that DSG had the necessary tools and skills to undertake replacement of the connecting rods’ piston pin bushes. No written agreement for this was recorded. The last visit by DSG (concurrent with an engine inspection by ship’s engineers) had taken place on 3 April 2018, with engine running hours at 110,365. During the visit, DSG replaced the engine thrust bearing and carried out crankshaft deflection measurements. 1.7 DIESEL SERVICE GROUP UAB 1.7.1 Overview DSG was established in 1995 and was based in Klaipeda, Lithuania. It specialised in the repair of marine diesel engines and other engine room and deck equipment. The company had provided a service for a wide range of ships. Many of its technical staff had previously worked in the Western Ship repair yard, Klaipeda. 1.7.2 Certification DSG was certified by the Lithuanian Maritime Safety Administration (LMSA)7 to perform repairs, checks and testing of ships’ main and auxiliary mechanisms, devices and related systems. DSG’s certification was renewed on 22 January 2016, and it was audited by LMSA on 28 February 2017; no non-conformities were raised. 7 The LMSA was renamed the Lithuanian Transport Safety Administration (LTSA) on 1 December 2017.
23 DSG was also registered with the Russian Maritime Register of Shipping (RMRS), which had issued a ‘Certificate of Firm Conformity’ in November 2015. The certificate was valid for 5 years subject to annual confirmation and stated that DSG was certified for, among other things: Code 22014000 ‘Construction, conversion, modernization and repair of items of technical supervision products’, include:
- Repair of ship’s engines up to 8500kW. [sic]
DSG was also accredited by the Italian classification society Registro Italiano Navale (RINA) with a ‘Workshop Approval Statement’, covering the design, diagnostics, maintenance and repair of ships’ systems and equipment. The certificate was valid until 18 March 2019. The approved workshop status was based on evidence provided, including qualification levels and experience, and a review of the workshop procedures and instructions. The statement did not specify any engine size or power limitation. DSG was not required to have a quality management system but was in the process of applying for ISO 9001:20008 and gaining third party certification. In this respect, a quality management system was under development, including a quality policy, project planning, division of responsibilities and quality objectives. To perform the maintenance on various engines, it had a range of marine engine manufacturers’ instructions, including MAN and S.E.M.T. Pielstick engines. DSG was not an accredited service provider for MAN. 1.8 CONNECTING ROD PISTON PIN BUSH RENEWAL 1.8.1 MAN guidance and procedure The wear limit between the piston pin and its bearing bush was 0.46mm. From experience, MAN expected the bearing pin bush to be replaced after 36,000 running hours. MAN’s piston pin bush removal procedure required the use of a milling machine to accurately cut a groove along the internal face of the bush. The cut needed to be a sufficient depth to leave less than 0.5mm of material on its outer edge without cutting into the surface of the connecting rod small end. The compression force acting on the bush due to its interference fit9 in the eye of the small end, caused the remaining thin layer of material to collapse inward, allowing the bush to be removed. New bushes were required to be cooled and shrunk using liquid nitrogen before they could be inserted in the small ends. The MAN 48/60 engine maintenance manual stated: Important! If required, the piston pin bush should be replaced in a Service Workshop, as the bush is to be cooled down before being installed. 8 ISO 9001:2000 specifies requirements for a quality management system where an organisation needs to demonstrate its ability to consistently provide a product that meets the customer and applicable regulatory requirements. 9 An interference fit (press fit and shrink fit) is a frictional connection for rotating components. Joint pressure in the friction surface between the two components is necessary for the torque to be effectively transmitted; this pressure is generated by the deformation of the two components, e.g. a shaft and its bearing.
24 MAN PrimeServ, the brand name for MAN’s service division, offered aftersales and through-life maintenance support for all MAN engines and systems. It provided a worldwide, round-the-clock service and had a global network of service workshops and test facilities. It also offered a variety of training courses for its customers’ marine engineers and other technical staff. MAN PrimeServ had two service stations worldwide that it considered equipped and able to conduct the bush renewal process; one of them was based at MAN’s headquarters in Hamburg, Germany. 1.8.2 Diesel Service Group guidance and procedure DSG carried out work on a range of vessels and engine types, including five operated by DFDS. On average, DSG had replaced two to three piston pin bushes per year for DFDS, of which about 24 were fitted to the MAN 12V 48/60 engines on board Finlandia Seaways and Botnia Seaways. The removal and installation of the MAN connecting rod piston pin bushes was carried out by DSG at its workshops in Klaipeda (Figure 23). DSG’s documented piston pin bush removing and installing procedure for the MAN 12V 48/60 engine (Figure 24) was similar to that followed by MAN. To remove the piston pin bush in accordance with the procedure, one side of the bush had to be bored away using a milling machine before pressing it out. The new bush needed to be cooled using liquid nitrogen to – 195ºC and measured before being inserted into the small end eye; a specialist tool was required to be used when aligning the bush. DSG employed one person to oversee the work and produce the technical repair document, and only one technician was permitted to use the milling machine. DSG was unable to confirm whether anyone else, including possible subcontractors, had undertaken this work. Figure 23: Diesel Service Group workshop and milling machine (inset) Diesel Service Group workshop showing position of the milling machine The milling machine
25 Figure 24: Diesel Service Group: small end piston pin bearing bush renewal procedure DSG’s documented piston pin bush removing and installing procedure for the MAN 12V 48/60 engin e
26 DSG carried out similar piston pin bush replacements on S.E.M.T Pielstick engines. The S.E.M.T Pielstick manufacturer’s instructions specified that the connecting rod small end bearing bush could be removed by making two diametrically opposed saw cuts in the bush. In February 2017, DSG carried out a 12,000-hour overhaul of Finlandia Seaways unit A5. The total engine running hours was 103,007 and the remarks recorded in the vessel’s PMS included:
●Piston with connecting rod small end:
○Dismantling, disassembling, cleaning, measurements, disassembling of piston, replacement of piston head (used), assembly of piston with new studs,
○Replacement of conrod small end, assembling of piston and conrod small end with new small end bush, installing with new piston rings in accordance with engine manual.
○Installing with new piston rings. The work was carried out in Rosyth, and the small end was replaced with one of DFDS’s spare small ends (COC 61584), which had been overhauled in November
- A summary of A5 small end overhauls based on engine running hours only is
set out in Table 3. Table 3: A5 small end overhauls and inspections Date Engine operating hours Remarks 20/12/2002 15,885 Piston pin checked ok 03/03/2005 30,631 Pin and bush inspected 25/06/2007 46,279 Piston pin checked 02/02/2010 60,009 Piston pin bush checked, measured the clearance 03/10/2012 75,058 Fitted connecting rod with new piston pin bush 07/10/2014 87,637 Piston pin bush replaced 21/02/2017 103,007 Replacement of con rod small end with new small end bush [COC 61584] The MAIB and Lithuanian Transport Accident and Incident Investigation Division (TAIID) inspectors visited DSG on 16 July 2018. DSG was unable to identify when, or by whom, the A5 piston pin bush had been replaced. A subsequent inspection by LTSA on 4 September found that DSG was unable to provide evidence to confirm that liquid nitrogen had been used to shrink the piston pin bush during the overhaul of the small ends. As DSG was not accredited by MAN, it did not have access to MAN’s piston pin bush removal and installation tools and procedures.
27 1.9 ENGINE MANUFACTURER’S POST-FAILURE ENGINE INSPECTION AND GUIDANCE 1.9.1 Engine inspection and failure mode analysis MAN attended Finlandia Seaways after the accident while it was berthed alongside in Immingham. The engine debris had been left untouched to allow their site examination. Independently, but like the MAIB’s initial examination, the focus of interest became the A5 connecting rod. The upper half of the broken small end was found in the debris field on the starboard side of the engine, and the severely damaged piston pin bush was found nearby. Inspection of the failed surfaces of the small end identified a potential fracture face on one side of the small end eye (Figures 25a, 25b and 25c). The remnants of the failed A5 small end, the B5 small end and various other components, including the OMD, were taken ashore by MAN for further analysis. MAN examined the failed A5 connecting rod small end on 22 June 2018 at its laboratory in Augsburg, Germany. MAIB inspectors and a DFDS representative were in attendance during the examination process. Work carried out included:
● microscopic examination of the small end fracture faces,
● metallurgical composition testing, and
● notch toughness testing10. The MAN investigation of A5 connecting rod small end (COC 61584), identified that:
● The small end was originally fitted to Botnia Seaways at build in 1999 and was the latest design version.
● It had never been serviced by MAN.
● The fracture might have occurred over a period of weeks or months.
● Due to the damage on the fracture surface, it was not possible to identify the locus of the fracture.
● The chemical composition did not fully correspond with the material specification. The ductile properties of the material were slightly below the required specification.
● A microsection showed a quenched and tempered microstructure but with an aggregation of non-metallic inclusions. The examination of B5 (COC 113544) found no abnormalities and MAN’s investigation established that it was delivered in 2007. In addition, the investigation report (Annex A) concluded that:
● The OMD alarm was the first indicator of a problem, quickly followed by physical destruction of internal engine components. 10 A standardized high strain-rate test, which determines the amount of energy absorbed by a material during fracture.
28
● The OMD did not have the ability to record alarms or faults to assist the investigation.
● The A5 small end was probably the first major component to exit the crankcase. For engines of the type 48/60, MAN also identified that over half of its engines in service had accumulated over 100,000 running hours, with two operating at 180,000 running hours without similar small end failures. Figure 25a: A5 small end upper half Fracture surface on the upper half of the A5 small end Figure 25b: A5 small end fatigue fracture Photos and diagram to illustrate fatigue fracture on the A5 small end Bearing bush A5 Fatigue facture Crack initial side Fracture surface Base images courtesy of MAN Energy Solutions
29 Figure 25c: A5 looking forward and fatigue fractureDrawing of the A5 connecting rod, looking forward, showing position of the fatigue fracture Fatigue fracture Connecting rod A5 Base image courtesy of MAN Energy Solutions
30 At MAN’s request, the remaining 10 connecting rod small ends from Finlandia Seaways were sent to MAN for inspection. After the piston pin bushes were removed, seven were found to have cuts, or notches, at the edges and on the internal faces of the small end eyes (Figure 26 and Table 4). The cuts were symptomatic of the use of a disc cutter or angle grinder. Small ends: A3; B1; B2 and B4 were subsequently identified as having the same respective overhaul and installation dates. It is probable that the overhauls were carried out at the DSG workshop in Klaipeda before installation while the vessel was alongside in Rosyth. Small end (COC No) Date installed in engine Date overhauled by DSG New piston pin bush fitted Cuts or notches found in small end eye Engine running hours at installation Small end running hours at time of engine failure11 A1 (62085) 29/12/2016 unknown Yes Yes 102,091 88,765 A2 (61868) 06/06/2017 unknown Yes Yes 105,058 89,233 A3 (62009) 15/08/2017 15/08/2017 No Yes 106,399 91,344 A4 (62110) 06/06/2017 unknown Yes Yes 105,058 88,946 A5 (61584) 21/02/2017 11/2016 Yes Unknown 103,007 90,467 A6 (113538) 18/04/2017 unknown Yes No 104,096 88,677 B1 (61993) 02/01/2017 02/01/2017 No Yes 102,140 89,455 B2 (61944) 18/04/2017 18/04/2017 No No 104,096 88,466 B3 (61948) 07/11/2016 07/11/2016 No No 101,146 91,237 B4 (61857) 21/12/2016 21/12/2016 No Yes 102,091 90,389 B5 (113544) 29/12/2016 unknown Yes No 102,091 87,455 B6 (61996) 21/02/2017 unknown Yes Yes 103,007 89,048 Table 4: Finlandia Seaways’ main engine connecting rods, including small end damage 11 Engine running hours: 110,662
31 Figure 26: MAN – Finlandia Seaways’ small ends investigation Pa ge f rom MAN's investig ation show ing ph o tographs of the seven small ends wit h cuts, or not ches, at the edge s and on the internal faces of the smal l end eyes 1.9.2 Botnia Seaways Following the initial damage assessments and MAN findings, on 27 July 2018 MAIB and TAIID wrote jointly to MAN and LR raising concerns about the risk of similar catastrophic engine failures on board Botnia Seaways and other vessels operating MAN engines overhauled by DSG. In the letters, the engine manufacturer and
32 classification society were recommended to provide technical advice on actions to be taken by vessel operators at risk. DFDS subsequently withdrew Botnia Seaways from service. Between 6 and 25 August 2018, while out of service in Marseille, France, all of Botnia Seaways’ main engine connecting rods were replaced. During the initial inspection of the small ends, the attending LR surveyor identified heat marks on the inner edge of one of the small ends (Figure 27). MAN specialists examined the marks and concluded that they were not caused during engine operation. MAN’s assessment was that the localised heat marks had been caused by the application of intensive heat from something like a gas welding torch. MAN suggested that Figure 27: Botnia Seaways small end heat damage (circled)Heat marks on the inner edge of one of the small ends from Botnia Seaways' main engine connecting rods
33 this had been to assist with the piston pin bush removal/installation process. MAN further concluded that the intense local heating would have produced an annealing12 effect of the metal, resulting in structural changes affecting the material strength. MAN’s subsequent investigation of the 12 small ends returned for inspection identified:
● Notches/cuts on three small ends.
● Localised heat marks on three small ends.
● Damaged shank bolts on three connecting rods.
● Various levels of other spurious damage and wear. 1.9.3 Engine design modifications and updates MAN regularly provided targeted customer service information to advise customers on maintenance updates for specific engine types. Since February 2000, MAN had distributed 94 customer information documents for the 48/60 engine, including all the variants. In 2015, MAN circulated customer information notice No.344/2015 (PCI 344/2015) (Annex B), which advised that the connecting rod be renewed after 100,000 running hours. This was primarily based on increased ovality identified in the big end bearing housings. On receipt of the notice, DFDS checked the ovality of a selection of its connecting rod big ends during routine maintenance and, finding no ovality, kept them in service. Although DFDS had received them, the MAN customer information notices issued after Finlandia Seaways’ build were not available on board. 1.10 METALLURGICAL ANALYSIS As the initiation point of the A5 small end fracture was not identified during the examinations conducted by MAN, the MAIB commissioned The Test House (Cambridge) Ltd (TTH) to undertake further metallurgical analysis work. The remains of Finlandia Seaways’ A5 small end, and B5 and B6 small ends were delivered to TTH in October 2018. TTH’s initial inspection of A5 identified that: The fracture surface showed a flat/featureless surface, clear evidence of beach marks, post fracture mechanical damage on the fracture surface and bearing contact surface and a secondary crack in the oilway groove perpendicular to the fatigue fracture. The conclusions contained in TTH’s report (Annex C) included: The engine had failed in a catastrophic manner as a result of the A5 connecting rod small end failing due to fatigue. The fracture had initiated at the bearing contact surface and propagated through the body. 12 Annealing is a heat treatment that alters the physical and sometimes chemical properties of a material to increase its ductility and reduce its hardness, making it more workable.
34 Due to post fracture mechanical damage it was difficult to identify the point of initiation. The intact A6 small end had gouge marks on the edges of the bearing bush contact surface. The TTH report stated that: Although the intact small end [A6] showed no evidence of consequential features due to the gouge marks, such practises should be avoided at all costs as they can conclude to points of stress raisers. 1.11 EXTERNAL OVERSIGHT Classification societies conduct periodic reviews of critical machinery components to ensure they are in an appropriate condition; normally 20% of Class items are inspected per year over the mandated 5-year survey cycle. In accordance with LR rules and regulations, Finlandia Seaways was operated on a Continuous Survey Machinery (CSM) cycle. Consequently, its C/Es were authorised to carry out examinations of selected machinery while the ship was at sea or in port when LR was not represented. The process was explained by LR in its document Examination of Surveyable Machinery Items by Chief Engineers, effective 1 March 2015 (Annex D). The C/Es’ records of examination were audited annually by an LR surveyor and confirmatory surveys carried out. LR provided a template statement (Annex D) for completion by the C/E with a requirement that a copy be provided to the surveyor and a second copy remain on board. Applicable machinery items that could be examined by a C/E included:
● main engine connecting rods,
● piston pins, and
● piston pin bushes. The connecting rod was a certified item and had an LR stamp on it, but its piston pin bush was considered a consumable item. The replacement of a small end piston pin bush was considered routine maintenance on the part of the ship owner, and LR did not expect to be called in by an owner to witness routine maintenance between its mandated surveys. LR did expect to be notified if a certified component, such as the connecting rod, had been deemed beyond economical repair and was replaced, had a defect that was repaired, or if the component was modified. Cylinder A5 had previously been overhauled on 7 October 2014; the C/E’s statement of examination was dated 29 December 2014. The examination was then credited under the CSM cycle by an LR surveyor on 31 January 2015 (Table 5).
35 Table 5: Lloyd’s Register Component Survey List Conrod Description Date last credited by LR Type of credit13 A1 Cylinder, cover, bearings, piston, conrod, valves and gears January 2015 Complete A2 Cylinder, cover, bearings, piston, conrod, valves and gears January 2015 Complete A3 Cylinder, cover, bearings, piston, conrod, valves and gears January 2015 Complete A4 Cylinder, cover, bearings, piston, conrod, valves and gears January 2015 Complete A5 Cylinder, cover, bearings, piston, con-rod, valves and gears January 2015 Complete A6 Cylinder, cover, bearings, piston, conrod, valves and gears September 2017 Confirmatory B1 Cylinder, cover, bearings, piston, conrod, valves and gears January 2015 Complete B2 Cylinder, cover, bearings, piston, conrod, valves and gears January 2015 Complete B3 Cylinder, cover, bearings, piston, conrod, valves and gears January 2015 Complete B4 Cylinder, cover, bearings, piston, conrod, valves and gears September 2017 Confirmatory B5 Cylinder, cover, bearings, piston, conrod, valves and gears September 2017 Confirmatory B6 Cylinder, cover, bearings, piston, conrod, valves and gears September 2017 Confirmatory A subsequent C/E’s statement was completed on 4 September 2017 and included various engine parts examined since February 2017. These included cylinder B6 on 21 February 2017: No.6 STBD bank cylinder, cover, piston, cylinder liner, connecting rod & bearings, valves & gears were inspected during overhaul of cyl No6B. All parts cleaned, measured and found in good sound condition. Replaced piston rings, all o-rings and gaskets. No6B cyl was tested in work after assembling. No remarks. [sic] There was no reference to the replacement of the small end bush that had also occurred. 13 Items credited with ‘Complete’ indicate that the surveyor conducted a full survey of the item. ‘Confirmatory’ indicates that the surveyor was provided documentary evidence from the chief engineer regarding the condition of the equipment.
36 DFDS only had the C/E’s statement of examinations for cylinders A1, A2 and A5 that were overhauled during 2014, and LR interim certificates for July 2012 and December 2017. The local Klaipeda LR surveyor did not routinely retain his copies of the survey results as there was no obligation to do so. During their examinations, LR surveyors were advised to take pictures of the general condition of compartments and also of defects/observations. For specific engine components, photographs would be deemed necessary only if defect observations were made. As no defect observations had been made, no photographic evidence of surveys was available. 1.12 EMERGENCY RESPONSE 1.12.1 Carbon dioxide fixed fire-extinguishing system Finlandia Seaways’ CO2 fixed fire-extinguishing system comprised 221 x 53kg gas bottles, with the capacity to protect the engine room, upper cargo hold, lower cargo hold and paint store. Each protected space required a specified number of bottles to ensure that the correct percentage of CO2 was injected to smother a fire. Thirty-one bottles were required for the engine room, and they were released via the remote release station on the forecastle deck. The system could also be operated from the CO2 bottle room. Confirmation that CO2 had been released into the protected space was achieved by entering the CO2 bottle room and checking the appropriate control valve had activated and the manifold gas pressure gauge had dropped to zero. Frosting of the bottles and manifold pipes provided a further visual indication that gas had been released. Information to enable the crew to easily identify which spaces individual CO2 bottles protected was not provided in the bottle room, and the gas bottle operating valves did not provide a visible means of identifying whether they were open or closed (Figure 28). Following the activation of the CO2 system, it was unclear how many bottles had been released. Consequently, a specialist service engineer was required to attend the vessel and confirm that all 31 CO2 bottles had been released into the engine room. Marine Guidance Note (MGN) 389 (M+F) Operating Instructions and Signage for Fixed Gas Fire-Extinguishing Systems was published in 2009 by the Maritime and Coastguard Agency (MCA) following a series of fire investigations conducted by the MAIB, which identified issues relating to the quality and effectiveness of operating instructions and signage. The MGN quotes Chapter 5, Section 2.1.3.3 of the International Maritime Organization’s (IMO) Fire Safety Systems Code, which states: The means of control of any fixed gas fire-extinguishing system shall be readily accessible, simple to operate and shall be grouped together in as few locations as possible at positions not likely to be cut off by a fire in a protected space. At each location there shall be clear instructions relating to the operation of the system having regard to the safety of personnel. MGN 389 (M+F) recommends the use of colour coded controls for different discharge zones, and emphasises the importance of ensuring gas has been correctly released for a protected zone immediately after activation. For systems such as that fitted on board Finlandia Seaways, the MCA advised crew to look for frosting around the bottom of the discharged gas bottles.
37 Figure 28: Carbon dioxide bottle operating valveGas bottle operating valve showing no visible means of identifying whether they were open or closed 1.12.2 Means of escape Under the International Convention for the Safety of Life at Sea (SOLAS) Amendments (Chapter II-2, Part D, Regulation 13 – Means of escape), ships of more than 1000gt shall have two means of escape from each machinery space of category A14. Each escape shall be widely separated from each other and lead to the open deck. One of the escapes shall have a continuous fire shelter from the lower part of the space to a safe position outside. Finlandia Seaways met the means of escape requirements, with the continuous fire protection route being the primary escape route via the steel self-closing door at the port-forward bottom engine deck, up the enclosed stairwell via the control room and to the main deck (Figure 29). 14 Spaces which contain internal combustion machinery used for main propulsion.
38 Figure 29: Distribution of EEBDs in or near to the engine room and escape routes Plan diag ram shows distribu tion of EEBD s in or near to engi ne room and escape routes
39 The secondary means of escape, as used by the 3/E, via the funnel casing aft of the generators, was not enclosed. This route could be accessed from the bottom engine room deck, via a steel ladder near the propeller shaft on the port side, and up through a hinged steel hatch grating at generator deck level. 1.12.3 Emergency escape breathing devices Emergency escape breathing devices (EEBDs) are part of ships’ safety equipment, and their primary purpose is to enable crew to escape from a smoke-filled compartment. They should provide a minimum air supply of 10 minutes and are mandatory under SOLAS for ships where a safety equipment certificate applies. SOLAS 2000 Amendments (Chapter II-2, Part D, Regulation 13) introduced the requirement for emergency escape breathing devices (EEBDs). Section 4.3 Emergency escape breathing devices states: 4.3.1 On all ships, within the machinery spaces, emergency escape breathing devices shall be situated ready for use at easily visible places, which can be reached quickly and easily at any time in the event of fire. The location of emergency escape breathing devices shall take into account the layout of the machinery space and the number of persons normally working in the spaces. IMO MSC/Circ.849 (8 June 1998) – Guidelines for the performance, location, use and care of emergency escape breathing devices in section 4.6 states: Unless personnel are individually carrying EEBDs, consideration should be given for placing such devices along the escape routes within the machinery spaces or at the foot of each escape ladder within the space. IMO MSC/Circ.1081, Unified Interpretation of the Revised SOLAS Chapter II-2, 13 June 2003, relating to EEBDs, includes: Regulation 13.4.3 Emergency escape breathing devices (EEBD)
- This interpretation applies to machinery spaces where crew are normally
employed or may be present on a routine basis.
- In machinery spaces for category A containing internal combustion
machinery used for main propulsion, EEBDs should be positioned as follows: .1 one (1) EEBD in the engine control room, if located within the machinery space; .2 one (1) EEBD in workshop areas. If there is, however, a direct access to an escape way from the workshop, an EEBD is not required; and .3 one (1) EEBD on each deck or platform level near the escape ladder constituting the second means of escape from the machinery space (the other means being an enclosed escape trunk or watertight door at the lower level of the space). Alternatively, a different number or location may be determined by the Administration taking into consideration the layout and dimensions or the normal manning of the space.
40 The unified interpretation applies to all ships constructed on or after 1 July 2003. Finlandia Seaways had three EEBDs located in the engine room machinery spaces: one in the ECR, one in the workshop, and one on the engine room bottom deck at the aft end adjacent to the propeller shaft (Figure 29). A further six EEBDs were provided in the forward accommodation block (one on each deck) and one on the main deck forward equipment room. The LR Record of Approved Cargo Ship Safety Equipment (dated 31/12/12) identified 10 EEBDs, with two located in the engine room and eight in the accommodation. The engine room escape routes and locations of the EEBDs were clearly marked on Finlandia Seaways’ fire control and safety plan, which had been approved by LR on behalf of the vessel’s Administration. The nearest EEBD to the 3/E when he began his escape from the engine room tween deck, was one deck below, at the aft end adjacent to the propeller shaft. 1.12.4 Voyage data recorder recovery Finlandia Seaways was equipped with a Kelvin Hughes MDP-A5 voyage data recorder (VDR). It was fitted in 2010 and was supported by an uninterruptible power supply (UPS) battery to enable it to maintain recording capability when ship’s power was lost. The UPS batteries were last replaced in January 2015. Shortly after the fire, the company and master were requested to save the data recorded on the VDR. The MAIB recovered the VDR data as part of its investigation and discovered nothing had been recorded after the blackout. On 11 September 2017 a Kelvin Hughes representative had conducted an annual performance test (APT). The APT report identified that the UPS battery had an expiry date of 1 March 2019 and, during testing, sustained power to the VDR for more than 1 hour 55 minutes after the main power supply was removed. The report was returned to Kelvin Hughes, vetted and approved. 1.13 PREVIOUS/SIMILAR ACCIDENTS 1.13.1 Thetis D On 26 October 2015, the container ship Thetis D suffered a major main engine failure and subsequent engine room fire while on passage. Its MAN 58/64 CD engine suffered serious damage to its number 7 piston and connecting rod big end bearing. It also suffered structural damage to the crankcase adjacent to the bottom end bearing. The investigation report15 published by the German government’s marine transport accident investigation body, Bundesstelle für Seeunfalluntersuchung (BSU), identified that the bottom end bearing had been inspected by the vessel’s C/E 7 months earlier. The findings of the examination of the failed components by MAN and an independent engineer identified that after the inspection of the bottom end bearing, the conrod bolts had not been tightened correctly. The loss of bolt tension eventually resulted in bottom end bearing damage, piston seizure and ejection of engine components through the crankcase. 15 BSU report 431/15 – Serious engine damage followed by fire on board the cargo vessel THETIS D on 26 October 2015 in the Kiel Bight.
41 BSU recommended that Thetis D’s owners take the necessary steps to ensure qualified engine room personnel prepare, carry out and record maintenance and servicing works on key components properly. They also recommended that the classification society, at its next International Safety Management audit, focus on the procedure for maintaining and servicing key components to ensure it exists and is implemented. 1.13.2 Power station, Spain A Spanish power station using MAN 48/60 engines suffered a catastrophic engine failure during operation. MAN’s investigation identified the failure of a connecting rod small end to be the cause. Its investigation found that the technicians operating the engine had carried out a small end overhaul on the failed connecting rod. During the overhaul the technicians used a disc cutter to remove the piston pin bushes from the small ends. The disc cutter had also cut into the eye of the small end. MAN concluded that the disc cutter damage had introduced stress raisers, which eventually led to fatigue fracture and small end failure.
42 SECTION 2 - ANALYSIS 2.1 AIM The purpose of the analysis is to determine the contributory causes and circumstances of the accident as a basis for making recommendations to prevent similar accidents occurring in the future. 2.2 ACCIDENT OVERVIEW Finlandia Seaways’ main engine suffered a catastrophic failure that resulted in the violent ejection of heavy internal components from the crankcase into the engine room. The subsequent release of hot oil vapours caused a fire to break out and the engine room to become engulfed in thick black smoke. The 3/E was in the engine room at the time and he was extremely fortunate to have escaped and survived. In this section of the report, the engine failure mode will be identified and the factors that contributed to it will be analysed. The emergency response by the vessel’s crew, and the levels of emergency preparedness for the casualty event, will also be discussed. 2.3 ENGINE FAILURE 2.3.1 Sequence of events The initial indications that there was a problem with Finlandia Seaways’ main engine were loud metallic knocking noises heard by the on watch 3/E in the purifier room, and powerful vibrations felt throughout the ship by the OOW, master, C/E and the rest of the crew. The first engine alarm to activate was the main engine crankcase oil mist – high alarm, which was immediately followed by number six main bearing high temperature and splash oil monitor failure alarms. Within 2 seconds of the first alarm the engine’s standby lubricating oil pump started, and the automatic engine slow down sequence began. Ten seconds later, the engine room fire alarm was activated. OMDs are designed to identify and alert engineers to small changes in crankcase oil mist levels and therefore protect an engine against the potential consequences of hot spots created over a period of time due to events such as bearing wear or piston ring blow past. In cases where oil mist is ignited, the sudden increase in crankcase pressure should be released via the crankcase explosion relief valve doors. Although the initial alarm indicated that an oil mist had been generated in the crankcase, there was no evidence to suggest that a crankcase explosion had occurred prior to the catastrophic engine failure. The witness accounts and machinery alarm sequence clearly indicate that the accident was the consequence of a sudden major engine component failure rather than as a result of gradual wear and/or lubrication starvation. The loud mechanical knocking noises, automatic starting of the standby lubricating oil pump, the sequential failure of internal alarm sensors and the fact that the crankcase explosion relief valve doors did not open prior to the ejection of rotating components into the engine room, support this conclusion.
43 2.3.2 Identification of the component failure The structural damage to the engine crankcase was restricted to units five and six, with internal components from A5 and B5 cylinders being released into the engine room. It was therefore apparent that the initial component failure must have occurred in either A5 or B5 cylinder. The accident site damage inspection conducted by MAIB and MAN engineers was focused on identifying the likely locus of the failure and eliminating the components that had suffered secondary damage due to contact with other moving parts or sudden loss of lubrication. Both A5 and B5 connecting rods had failed and been thrown into the engine room. B5’s piston had also been thrown out of the crankcase, but the upper half of A5 piston was found to be seized in its damaged cylinder liner, with its piston pin still in place. It was therefore evident that the A5 connecting rod had failed at its small end eye. Either the piston had seized within the liner to such an extent that the connecting rod small end eye had sheered under tension, or the small end itself had suffered a metallurgical failure. The types of friction marks and liner damage typically associated with piston seizures due to misalignment, lack of liner lubrication or ring failure were not found when the recovered pieces of the broken A5 cylinder liner and A5 piston skirt were inspected. Furthermore, had a piston seizure caused the catastrophic failure, the connecting rod’s flanged shank connection should have failed first as it was the weakest part of the connecting rod assembly. Because of this, the failure of the A5 connecting rod small end was identified as the most likely cause of the catastrophic engine failure. When the small end failed, the A5 connecting rod would have begun flailing around inside the crankcase. At 500rpm, damage within A5 cylinder unit developed rapidly, tearing away alarm cabling and causing B5 cylinder components to also fail. Within seconds, the heavy rotating components were released and, with great energy, thrown through the crankcase into the engine room. 2.3.3 Failure mode The A5 connecting rod’s small end had completed just over 90,000 running hours. This was 10,000 hours fewer than the recommended limit set by MAN for the connecting rod, 20,000 less than the engine operating hours and up to 80,000 fewer than some of those accumulated on some similar MAN engines. This suggests that the failure had most likely been the result of either damage caused during the overhaul of the small end, an assembly error during the overhaul process or during its installation, or a metallurgical defect introduced during the initial manufacturing process. MAN’s metallurgical analysis of A5’s small end identified the presence of non-metallic inclusions within the material’s microstructure, and that the ductility of the metal was marginally below that required in its material specification. Although both factors would have an adverse effect on the material strength and durability of the small ends, MAN determined that the deviations were minor and within the acceptable safety margin limits set out in published guidelines. Both the MAN and TTH examination reports dismissed a manufacturing defect as being a likely cause of the failure.
44 When the upper half of the A5 connecting rod small end was found, a brief inspection of its failure faces was sufficient to identify the development of a fatigue fracture on one side of the small end eye (Figure 25a and 25b). Following closer examination of the failure faces, both MAN and TTH concluded that the mode of failure was a fatigue fracture. 2.4 FRACTURE MECHANISM 2.4.1 General Fatigue fracture is one of the primary failure modes in structural metal components and is often referred to as metal fatigue. Fatigue fracture results from cyclic stresses that are below the ultimate tensile strength, or even the yield strength of the material (Figure 30). As the original design strengths are not exceeded and the only warning sign of an impending fracture is a crack, which is often hard to see, fatigue damage is particularly dangerous. 2.4.2 Fatigue fracture Fatigue failure occurs in three stages: crack initiation, crack growth (slow propagation through the metal) and fracture (rapid failure of the remaining intact metal) (Figure 31). Fatigue cracks almost always start at the surface of a material. This is because:
● The most highly stressed fibres are usually located at the surface (bending fatigue). And
● The intergranular flaws, which precipitate tension failure are more frequently found at the surface. Crack initiation points, crack growth and propagation rates can be established by analysing the macroscopic beach marks that are usually created on a failure face prior to final fracture. TTH analysed the beach marks found on the small end’s failure face, and determined that the fracture had initiated at the bearing bush contact surface and had propagated outward. It also identified a secondary crack in the oilway groove perpendicular to the fatigue fracture. Since fatigue cracks generally initiate at a surface, the surface condition of the component being loaded will influence its fatigue life. Surface roughness is important because it is directly related to the level and number of stress concentrations on the surface. The higher the stress concentration the more likely a crack is to develop. Smooth surfaces increase the time before crack development. Notches, scratches and indentations can act as stress raisers and therefore decrease the time before crack development. The bush mating surface of the internal face of the small end eyes had been shot-peened to increase crack resistance. However, the introduction of notches, caused during the bush removal process, introduced stress raisers into the small end, increased the likelihood of fatigue crack initiation and therefore fatigue failure. 2.4.3 Notch effect and toughness Toughness is the ability of a metal to deform plastically and to absorb energy before fracture. There are several variables that have a major influence on the toughness of a material. These variables include: strain rate, temperature and notch effect.
rack growth and f racture
46 The third variable, notch effect, involves the distribution of stress. A material might display good toughness when the applied stress is uniaxial. However, when a multiaxial stress state is produced due to the presence of a notch, the material might not withstand the simultaneous elastic and plastic deformation in the various directions. A notch causes a disruption to the stress flow and introduces localised stress concentrations. The change of section concentrates stress most strongly where the transition is sharp (Figure 32). The introduction of a notch, or cut, in a material will affect the fracture development. The shape of the notch will also have an effect on how the stress propagates through the material. Fatigue loading is cumulative, and the fatigue strength decreases more rapidly over the cycling lifetime for notched samples. Figure 32: Plastic protractor under polarising light showing stress concentration Stress concentration at an inside corner of a plastic protractor 2.4.4 Localised heating Heat marks were found on several of the small ends removed from Botnia Seaways, all of which were condemned and had to be replaced. It was apparent that the heat marks were the result of localised heating applied by a gas welding torch or similar device. Temperature can also influence the fatigue life of materials. As the material’s temperature increases, so the fatigue life often decreases. A cyclic temperature change encourages failure by thermal fatigue; when the material heats in a non-uniform way, some parts of the structure expand more than others. This
47 non-uniform expansion introduces a stress within the material, and when the structure cools and contracts, stresses of the opposite nature are then imposed. As a consequence of the thermally-induced stresses and strains, fatigue fracture can eventually occur. Large masses of steel of heavy section will cool more slowly than small components of thin section. If not uniformly heated and quenched to produce a harder material overall, the effect of gradual cooling will introduce stresses between the hard and brittle surface and the softer layers below. These stresses can eventually initiate crack development. Uneven heating and subsequent cooling can also exacerbate crack formation. 2.4.5 Inspection and analysis MAN’s inspection and testing of the upper half of Finlandia Seaways’ failed A5 connecting rod small end was unable to identify the fatigue crack initiator due to heavy secondary damage of the part. However, MAN’s initial hypothesis on the failure, based on the visual inspection of the crack surface and the age of the small end, was that the relative movement between the bearing bush and the small end during the small end’s estimated 90,000 running hours exceeded the allowable value. This could have been caused by:
● plastic deformation of the small end (ovality), or
● heavily worn bearing bush, or
● maintenance irregularities during the bearing bush replacement. TTH’s examination assessed that the fatigue crack had started in the region of the oil groove, with a secondary crack within the groove itself, although post-failure damage prevented an accurate identification of the start point. The later inspection of Finlandia Seaways’ remaining small ends, and those of Botnia Seaways, confirmed that poor overhaul practices, in respect of notch and heat damage, were the most probable cause of the A5 small end failure. 2.5 MAINTENANCE MANAGEMENT 2.5.1 Overview The routine maintenance and major component overhauls for Finlandia Seaways’ and Botnia Seaways’ MAN 12V 48/60 main engines was undertaken in accordance with the schedules contained in the vessels’ electronic PMS. Most of the maintenance schedules were based on the accumulated running hours set by MAN. Minor routine maintenance was carried out by ship’s crew, but major overhauls were contracted out by DFDS. This included the inspection and, where necessary, replacement of the connecting rod small end piston pin bushes. To facilitate quick maintenance turnaround times, DFDS held a stock of six spare overhauled small ends for use on either vessel. Finlandia Seaways’ main engine maintenance and overhauls had been carried out in accordance with the schedules set out in the PMS, and were recorded electronically by its engineers. However, the post-accident examinations and laboratory tests carried out during this investigation, clearly showed that MAN’s guidance and
48 recommended procedures for overhauling the connecting rod small ends had not been followed, and the small ends had been damaged during the piston pin bush removal and fitting process. The extent of the damage was clearly visible to the naked eye but was either not identified during the engine/component overhauls or was ignored. 2.5.2 Connecting rod small end overhaul process MAN had a detailed set of procedures for the removal and installation of the 48/60 engine connecting rod piston pin bush, and its maintenance manual warned that they should be replaced in a Service Workshop because they had to be cooled before being installed. MAN’s aftersales service division, PrimeServ, offered around- the-clock support from its global network of service centres, which included two workshops specifically equipped to remove and fit the piston pin bushes. DFDS’s technical management was aware of MAN’s requirements and contracted DSG to carry out most of its engine overhauls. DSG was not a MAN-accredited service agent and did not have access to all of MAN’s maintenance guides and overhaul procedures. However, DSG’s documented piston pin bush removal and installation procedures were similar to MAN’s and included the use of a milling machine to cut a groove in the bush during the removal process, as well as liquid nitrogen and use of a special alignment tool during the fitting process. DSG had also designated a competent fitter to undertake the specific task of removing the piston pin bushes at its workshops in Klaipeda. Despite this, seven of the intact 11 small ends removed from Finlandia Seaways’ engine were found to have notch damage on the internal surfaces of their small end eyes. Three of Botnia Seaways’ small ends had similar damage and three had evidence of localised heat damage. Although the technical investigations did not identify when the damage had been done, it was clearly apparent that it had been caused by using a disc cutter and a gas torch during the overhauls undertaken by DSG’s service engineers. DSG’s failure to follow its own procedures might have been influenced by the fact that its engineers had experience of working on smaller engines where mechanical saws and presses were often used to remove and fit piston pin bushes. It is also possible that some of the overhauls were carried out on board the ships or in local workshops that did not have the specialist tooling required or a supply of liquid nitrogen. Regardless, the extent of the damage caused during the piston pin bush overhauls was visually apparent and, therefore, it was obvious that DSG’s service engineers did not appreciate the potential consequences of the stress raisers they had introduced. 2.5.3 Rotation of connecting rod small ends The two major components that comprised the split shank connecting rod – the big end and small end – each had their own COC identification numbers. As the two parts were not specifically matched to each other, it enabled DFDS to replace the small ends with spares, and therefore reduce the time taken to conduct connecting rod overhauls. Consequently, there was a disparity between engine running hours (110,662 hours at failure) and individual small end running hours, of roughly 20,000 hours, with the A5 small end having accumulated just over 90,000 hours in total. This was further complicated because the six spare small ends had been rotated between Finlandia Seaways and Botnia Seaways.
49 The rotation of the small ends could be considered efficient in terms of keeping vessel downtime to a minimum, but it required an operating hours’ log for both the connecting rod big end and the small end. Although the onboard records were maintained, the DSG maintenance documents gave the COC numbers for only some of the small ends, having misunderstood which identification number to use. This introduced the possibility for errors to occur. MAN’s customer information notice PCI 344/2015 required the connecting rods to be replaced after 100,000 running hours. MAN viewed the connecting rod as a whole unit, however PCI 344/2015 referred only to the risk of bottom end ovality as the reason for replacement. Although DFDS understood that PCI 344/2015 related to the whole connecting rod, in referring to only the bottom end as the reason for replacement, MAN potentially introduced confusion over whether replacement included the small end. Regardless, DFDS did not replace the connecting rod big ends after they reached 100,000 hours; instead, it measured a selection of big ends for ovality. Finding no ovality, DFDS decided to continue operating the connecting rods. This decision was made without consulting either MAN or LR. MAN had not considered the possibility of a vessel operator rotating small ends and keeping a supply of spares. It might make sense to occasionally replace a damaged small end with a new or overhauled spare. However, PCI 344/2015 referred to the connecting rod in its entirety, regardless of its separate components, and the manufacturer’s instructions should have been followed. Nevertheless, the ability to separate the small end from the shank, which included the big end, introduced the possibility of them being seen as separate components and maintained independently of each other. 2.5.4 Diesel Service Group quality control DSG was an established ship repair company and was certified and accredited to carry out repairs to ships’ auxiliary systems and main propulsion engines by various state authorities and maritime organisations. It had worked on DFDS MAN engines for almost 10 years and had replaced at least 24 piston pin bushes on board Finlandia Seaways and Botnia Seaways. It had also worked alongside PrimeServ technicians and was in the process of gaining ISO9001-2000 accreditation for its quality management system. DSG employed one person to oversee the work and produce its technical repair documents. However, documentation giving dates when each small end was overhauled, and by whom, was not available, and identification of every small end from DSG records was unclear as DSG had not always used the small end COC numbers for identification purposes. The visits to DSG by the MAIB, TAIID and LMSA included requests for documentation to identify when and how small end bush replacement was carried out. DSG was unable to provide this documentation. It was also apparent from the MAIB’s and TAIID’s visit to DSG that the damage to the small ends was viewed as inconsequential when compared with the mass of metal that made up the small end. As such, no comments or other references to the damage were identified in the available documentation.
50 DSG’s Certificate of Firm Conformity for the construction, conversion, modernization and repair of items of technical supervision products, issued by RMRS, included an engine power limitation of 8,500kW. This limitation implied that the Russian maritime administration did not consider DSG competent or equipped to undertake work on more powerful engines, such as MAN’s 12,600kW 48/60 engine. DSG attributed the power rating discrepancy to an administrative error, but was unable to substantiate this. However, the RINA ’Working Approved Statement’, which included the repair of ships’ main engines, did not specify a power limit. Given DSG’s experience and the number of the ship repairer’s other external accreditations, it is possible that the power rating limit set on its RMRS certificate was an administrative error. However, this should have been noticed and rectified by DSG’s quality control manager. Similarly, the poor record keeping identified during the MAIB, TAIID and LMSA visits to DSG’s workshops in Klaipeda, and the standards of work its service engineers were allowed to carry out over a prolonged period of time, were strong indicators of significant weaknesses in the company’s quality management system. 2.5.5 DFDS quality control DSG’s work on board Finlandia and Botnia Seaways was overseen by the vessels’ engineers and a DFDS technical superintendent. It was unclear what processes the vessels’ engineers and the technical superintendent followed when the overhauled small ends were returned to the vessels. There were no written inspection or quality control procedures, and it is unknown if any of the vessels’ engineers thoroughly examined the small ends before they were installed in the engine. It was apparent from MAN’s photographs (Figure 26) of the seven damaged small ends, that the cut marks at the periphery of the small end eyes were visible to the naked eye even with the bush installed. Consequently, either no pre-installation inspection took place, or there was no concern about the cut marks. The latter was probably the most likely as, when the damage was discussed with DFDS’s technical management team, a similar view to DSG was expressed. Any damage identified to major engine components, no matter how inconsequential it might appear, should be properly assessed, and any actions taken, or decisions made should be recorded in the planned maintenance system. The extent of the damage found to the connecting rods fitted to Finlandia Seaways and Botnia Seaways was significant and should have been highlighted to MAN and LR. 2.5.6 Classification Society oversight Finlandia Seaways’ main engine connecting rods were class survey items, but LR was unaware of the damage caused to the small ends during overhaul, or the fact that the connecting rod big ends had accumulated more running hours than recommended by the engine manufacturer. Finlandia Seaways was being managed on a CSM cycle, and its C/Es were authorised by LR to carry out examinations and report on the condition of selected machinery items. LR would then carry out a confirmatory survey with a review of the records of examination by the C/E and a general examination of items to be credited. It was apparent from the C/Es’ statements of examined machinery items that the replacement of piston pin bushes, or the use of the spare small ends, was not being reported. Furthermore, the small end damage had not been photographed or noted
51 in the vessel’s planned maintenance records. Consequently, once the small ends had been installed in the engine, the opportunity for an LR surveyor to identify a safety issue was lost. During machinery examinations, it is the vessel operator’s responsibility to present satisfactory maintenance and monitoring records and valid supporting information, such as original equipment manufacturers’ maintenance recommendations and service updates, in order for the class surveyor to complete the survey. Otherwise, as in this case, machinery items could have been credited which, according to the manufacturer, might already exceed the recommended service life. 2.6 EMERGENCY RESPONSE 2.6.1 Overview The vessel’s machinery alarm log (Table 1) showed how rapidly events developed before the engine shut down and the fire started. It was apparent that the crew had little opportunity to conduct an emergency shutdown of the engine to prevent further damage. After the catastrophic engine failure, the subsequent fire, caused by the ejection of hot oil, was intense but short-lived, and fire damage was localised. The fire was limited, in part, by the lack of readily available fuel sources, but also by the prompt actions of the crew, including closing the fire flaps on deck, shutting off the fuel quick-closing valves, stopping the fuel pumps and ultimately the injection of CO2 into the engine room. 2.6.2 Carbon dioxide bottle identification It was evident to the vessel’s crew, when they entered the CO2 bottle room, that the fixed fire extinguishing system had been activated and that CO2 had been released into the engine room. This was because the engine room injection valve was open, the discharge pipe and some bottles had frosted, and the manifold pressure gauge was seen to drop to zero. However, it was unclear how many bottles had been released. This was because the 221 gas bottles in the bottle room had not been clearly marked to show which protected spaces they served. It was several days after Finlandia Seaways arrived at Immingham that a specialist in fire protection systems confirmed that all 31 CO2 bottles assigned to the engine room had been released. Although DFDS had operated Finlandia Seaways for many years, and some of its crew had served on board many times, information to identify the 31 bottles assigned to the engine room was not readily available on board. It is apparent, both from this case, and from previous fire investigations as identified in MGN 389, that inadequate signage can potentially compound an already serious situation. If it is not possible to identify which, or how many bottles have been released, it leaves the crew in a predicament. On ships where several compartments are protected, each with a specified number of allocated bottles, crew need to be confident that a sufficient amount of gas has been released. MGN 389 states the measures that should be applied when checking the bottles that have been released, including frosting around the base of the bottles. However, in a large multiple bottle bank system it may not be feasible to inspect the base of bottles at the rear of a bank where only the bottle valves are visible. Having comprehensive
52 guidance on board to enable identification of which bottles relate to a specific compartment will assist with checks after releasing CO2, and reduce the likelihood of potentially fatal inadvertent releases of gas during post-accident activities. 2.6.3 Effective numbers and distribution of EEBDs There were three EEBDs in Finlandia Seaways’ engine room machinery spaces: one in the ECR, one in the workshop and one on the bottom plates close to the secondary escape route, meeting the requirements of MSC/Circ.849. As Finlandia Seaways was constructed before 1 July 2003, MSC/Circ.1081 was not applied, but, if it had been applicable, it would have required one EEBD to be positioned on each deck or platform level near the escape ladders, constituting the second means of escape. The escape route used by the 3/E to evacuate the engine room was the designated secondary means of escape, but only one EEBD was located at the lowest point of the secondary escape route, below the tween deck. The 3/E was trapped by the fire at the aft end of the engine room tween deck and had no choice but to use the secondary escape route. Fortunately, he was able to locate the escape route ladder in dense black smoke, and despite falling off the first vertical ladder several times, he was able to climb out of the engine room onto the open deck without an EEBD. EEBDs are designed to provide a minimum 10-minute air supply to allow personnel trapped by smoke or other toxic atmospheres to escape. To enable their use in an emergency, the number and distribution of EEBDs within a compartment needs to be considered carefully. If the 3/E had been able to don an EEBD during his escape, he would not have experienced the problems or suffered the injuries he did. It is unfortunate that the unified interpretation in MSC/Circ.1081 was not retrospectively applied to all ships given that installing extra EEBDs would not be an overly onerous requirement for vessel operators. On Finlandia Seaways, anyone trapped by smoke on the tween deck and unable to reach the engine workshop would need to climb down to the bottom plates to get an EEBD before using one of the two escape routes. Climbing down to retrieve an EEBD before making an escape is not particularly intuitive in an emergency. It is apparent from this accident that more consideration could be given to the number and location of EEBDs in Finlandia Seaways’ engine room. As a minimum, an additional EEBD at the secondary escape ladder on the tween deck level would be a sensible addition. 2.6.4 VDR VDRs provide crucial evidence to aid safety investigations. The VDR on board Finlandia Seaways stopped recording as soon as the ship blacked out. This denied investigators information that could have supported various elements of the investigation, including propulsion and communications data. Initial indications suggested that the UPS battery had failed. Although the VDR system had passed its yearly APT inspection in November 2017, the battery was incapable of providing power 5 months later. Recognising that older or incorrect batteries may not provide the longevity required, in May 2018 Kelvin Hughes issued a technical advice sheet, reducing the battery replacement period to 3 years from the previously stipulated 4 years. The supply of a battery maintenance kit also became mandatory from 1 January 2019.
53 SECTION 3 - CONCLUSIONS 3.1 SAFETY ISSUES DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS
The fire on board Finlandia Seaways was the consequence of a sudden major engine component failure, which led to the ejection of heavy engine parts from the crankcase and release of hot oil vapours into the engine room. [2.3.1]
The catastrophic failure of Finlandia Seaways’ main engine was caused by a fracture of the A5 connecting rod small end. The A5 small end was found to have suffered a fatigue fracture. [2.3.2, 2.3.3]
The introduction of notches, probably caused during the bush removal process, introduced stress raisers into the small end, increased the likelihood of fatigue crack initiation and therefore fatigue failure. Practical testing has shown that a notch in a loaded component will reduce its lifetime-to-failure. [2.4.2, 2.4.3]
MAN’s inspection of Finlandia Seaways’ remaining small ends, and those of Botnia Seaways, confirmed that poor overhaul practices were the most probable cause of the A5 small end failure. [2.4.4, 2.4.5]
This investigation found that MAN’s guidance and recommended procedures for overhauling the connecting rod small ends had not been followed and the small ends had been damaged during the piston pin bush removal and fitting process. [2.5.1]
Seven of the eleven intact small ends removed from Finlandia Seaways’ engine were found to have notch damage on the mating surface with the bush. These were clearly the result of the use of a disc cutter to remove the bushes. Additionally, heat marks identified on Botnia Seaways’ small ends, and the lack of evidence provided by DSG on the use of liquid nitrogen, indicates that both heating and using a disc cutter on the bush insitu was common practice. [2.5.2] 7. The conrods were not overhauled in accordance with DSG’s written procedures, and maintenance was not properly recorded. [2.5.4]
There was a lack of appreciation by DSG or DFDS of the potential consequences of the stress raisers introduced during overhaul of the connecting rod small ends, and the damage was viewed as inconsequential when compared with the mass of metal that made up the small end. [2.5.4, 2.5.5]
Finlandia Seaways’ main engine connecting rods were class survey items, but LR was not informed of the damage caused to the small ends during overhaul, or that connecting rods had accumulated more running hours than recommended by the engine manufacturer. [2.5.6]
54 3.2 SAFETY ISSUES NOT DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS
Localised heating was found on several small ends from Botnia Seaways. If not uniformly heated, the large mass of steel of the small end could introduce stresses, which could eventually initiate crack development. [2.4.4, 2.5.2]
On receipt of the customer information notice PCI 344/2015, DFDS decided to continue operating the connecting rods without consulting either MAN or LR. Had a discussion taken place, it might have led to the replacement of the entire connecting rods, identified the differential in operating hours of the small ends and the fact that small ends were being rotated between the two vessels. [2.5.3]
Regarding the overhaul of small ends, DFDS had no written inspection or quality control procedures, but given the notch marks on the small ends were visible to the naked eye, it is evident any examination by the vessel’s engineers was insufficiently thorough. [2.5.5]
It is apparent from the C/E’s statements of examined machinery items that small end bearing bush renewal, or the replacement of the small end with a spare, was not being reported to LR. [2.5.6]
This case and previous fire investigations, as identified in MGN 389, have highlighted that having comprehensive on board guidance, to enable identification of which CO2 bottles relate to a specific compartment, will assist with checks after releasing CO2. [2.6.2]
The 3/E was very fortunate to have survived the fire given the lack of an EEBD placed along the secondary means of escape. If he had been able to don an EEBD, he would not have suffered the stress and injury that resulted from his escape from the engine room. [2.6.3] 7. It is unfortunate that the unified interpretation in MSC/Circ.1081 was not retrospectively applied to all ships given that installing a few extra EEBDs would not be an overly onerous requirement for vessel operators and it would improve the opportunity to successfully escape from machinery spaces in an emergency. [2.6.3]
The VDR UPS battery failure denied data that could have supported various elements of the investigation, including propulsion data and communications. [2.6.4] 3.3 OTHER SAFETY ISSUES NOT DIRECTLY CONTRIBUTING TO THE ACCIDENT16
The customer information notice PCI 344/2015, in referring to only the bottom end as the reason to replace the connecting rod and the ability to separate the 48/60 engine connecting rod shank from the small end, potentially introduced confusion over whether maintenance of each component could be carried out separately. [2.5.3] 16 These safety issues identify lessons to be learned. They do not merit a safety recommendation based on this investigation alone. However, they may be used for analysing trends in marine accidents or in support of a future safety recommendation.
55 SECTION 4 - ACTION TAKEN 4.1 MAIB ACTIONS The MAIB and Lithuanian Transport Accident and Incident Investigation Division have: Issued a combined recommendation17 on 27 July 2018 to MAN Energy Solutions and to Lloyd’s Register to:
● Provide technical advice to DFDS on the actions the company should take to minimise the risk of a similar catastrophic engine failure on board Botnia Seaways, and any other vessel operators whose MAN engines might have been subjected to similar maintenance practices. 4.2 ACTIONS TAKEN BY OTHER ORGANISATIONS DFDS Seaways AB-Lithuania has:
● Inspected and renewed all 12 connecting rods on board Botnia Seaways.
● Carried out main engine overhauls on board five of the company’s vessels with reference to the MAIB/TAIID recommendation and manufacturers’ service letters.
● Increased the number of staff in their preventative maintenance system support team.
● Issued a fleet safety bulletin that instructs crews on board their vessels:
○to be familiar with CO2 systems, that they have clear operating instructions and the number of cylinders for each compartment is understood;
○to assess safe means of escape from the engine room and the location and number of EEBDs with respect to MSC/Circ.1081.
● Reviewed its database of contractors to ensure that those who carry out main engine repair and maintenance work on board its vessels are suitably qualified.
● Continued to review its company PMS on board vessels it operates to ensure that vessel equipment manufacturers’ maintenance, repair and replacement guidance is followed.
● Complied with the Kelvin Hughes technical advice sheet regarding VDR battery replacement. MAN Energy Solutions has:
● Investigated the cause of the A5 small end failure on board Finlandia Seaways.
● Analysed the remaining 11 small ends retrieved from Finlandia Seaways’ main engine. 17 Recommendation 2018/121
56
● Examined the small ends retrieved from Botnia Seaways’ main engine.
● Liaised with LR to provide appropriate guidance to DFDS in respect of the MAIB/ TAIID recommendation. Diesel Service Group has:
● Provided assurances that only Finlandia Seaways and Botnia Seaways, using the MAN 12V 48/60 main engine, were at risk of small end damage during bearing overhaul. Lloyd’s Register has:
● Liaised with MAN Energy Solutions to provide appropriate guidance to DFDS in respect of the MAIB/TAIID recommendation.
● Attended Botnia Seaways to inspect the small ends bearings removed from the main engine.
● Assessed whether other vessels, classed by LR and maintained by DSG, were at risk.
● Updated “The Examination of Surveyable Machinery Items by Chief Engineers” to include:
○the scope of service overhauls specified by the original equipment manufacturer;
○that the chief engineer’s maintenance and monitoring records should be made available;
○if the surveyor is not satisfied with the chief engineer’s statement, records or operating condition, they may request items be opened for inspection.
● Updated its instructions to surveyors relating to CSM surveys. Lloyd’s Register (Klaipeda) has:
● Undertaken to discuss the issue with technical superintendents of shipowners, operators and managers and/or ships’ C/Es when diesel engines repair/ maintenance works are undertaken by contractors, with respect to engine manufacturers’ recommendations. Kelvin Hughes has:
● On 14 May 2018, issued a VDR technical advice sheet for the supply of a battery maintenance kit to address regulatory requirement changes where old or incorrect type batteries had been used that failed to perform in the event of an incident. It advised that, on installation, the battery should be given a 3-year expiry date. The policy became mandatory from 1 January 2019.
57 SECTION 5 - RECOMMENDATIONS DFDS Seaways AB-Lithuania is recommended to: 2021/102 Review and improve how its chief engineers conduct class-related equipment examinations as part of the Continuous Survey Machinery cycle to ensure that examinations are conducted thoroughly and reported accurately. Diesel Service Group (Klaipeda) is recommended to: 2021/103 Fully apply equipment manufacturers’ maintenance and repair guidance and procedures. 2021/104 Review and, as necessary, amend its record keeping in order to generate a full and auditable record of the maintenance carried out by its staff. 2021/105 Review and update staff training to ensure familiarity with engineering methods appropriate for the various repair and overhaul tasks, backed up with a suitable quality assurance process to ensure standards are maintained. Safety recommendations shall in no case create a presumption of blame or liability
Marine Accident Report
FD06057 | 2018_英国_unintentional-release-of-carbon-dioxide-from-fixed-fire-extinguishing-systems-on-ro-ro-vessels-eddystone-and-red-eagle_2018-16-_Eddystone_and_Red_Eagle.pdf.pdf
分类:06_境外及港澳台调查报告 | 年份:2018 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
M A R I N E A C C I D E N T I N V E S T I G AT I O N B R A N C H ACCIDENT REPORT MARINE INCIDENT REPORT NO 16/2018 SEPTEMBER 2018 Report on the investigation of unintentional release of carbon dioxide Eddystone in the Red Sea on 8 June 2016 and Red Eagle in Southampton Water on 17 July 2017
Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2018 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. All MAIB publications can be found on our website: www.gov.uk/maib For all enquiries: Marine Accident Investigation Branch First Floor, Spring Place 105 Commercial Road Southampton Email: maib@dft.gov.uk United Kingdom Telephone: +44 (0) 23 8039 5500 SO15 1GH Fax: +44 (0) 23 8023 2459 Press enquiries during office hours: 01932 440015 Press enquiries out of hours: 020 7944 4292
CONTENTS GLOSSARY OF ABBREVIATIONS AND ACRONYMS GLOSSARY OF TECHNICAL TERMS SYNOPSIS 1 SECTION 1 - BACKGROUND 2 1.1 Fixed fire-extinguishing systems 2 1.2 Carbon dioxide (CO2) as a fire-extinguishing medium 2 1.2.1 Properties of CO2 2 1.2.2 Effect of CO2 on human physiology 2 SECTION 2 - FACTUAL INFORMATION: EDDYSTONE 4 2.1 Particulars of Eddystone and incident 4 2.2 Narrative 5 2.2.1 Incident 5 2.2.2 System reinstatement 7 2.3 Company, vessel and crew 8 2.3.1 Company and vessel 8 2.3.2 Crew and other personnel 8 2.4 Fire-extinguishing system description 8 2.4.1 Configuration 8 2.4.2 Protection 8 2.4.3 Cylinder valves 10 2.5 Inspection and maintenance 11 SECTION 3 - FACTUAL INFORMATION: RED EAGLE 12 3.1 Particulars of Red Eagle and incident 12 3.2 Narrative 13 3.2.1 Incident 13 3.2.2 System reinstatement 13 3.3 Company, vessel and crew 15 3.3.1 Company 15 3.3.2 Vessel and crew 15 3.4 Fire-extinguishing system description 15 3.4.1 Configuration 15 3.4.2 Protection 17 3.4.3 Cylinder valves 17 3.5 Inspection and maintenance 19 3.6 Tests carried out 19 3.6.1 Cylinder valves’ leak test 19 3.6.2 Pressure switch test 20 SECTION 4 - COMMON TOPICS 22 4.1 Safer alternatives to CO2 22 4.2 Regulations and guidance 22 4.2.1 International requirements 22 4.2.2 Cylinder valves 22
- 2.3
System testing 23 4.2.4 Land-based installations: requirements for CO2 cylinders and cylinder
valves 24 4.2.5 Approval of service suppliers 25 4.3 Previous accidents 25 4.3.1 Published reports 25 4.3.2 Cases involving sister vessels to Eddystone 26 4.3.3 Cases from Mariners’ Alerting and Reporting Scheme 27 4.3.4 United States Coast Guard reports 27 4.3.5 Research on CO2 related accidents 27 SECTION 5 - ANALYSIS 29 5.1 Aim 29 5.2 Overview 29 5.3 Mechanism of CO2 release 29 5.3.1 Eddystone 29 5.3.2 Red Eagle 30 5.4 Cylinder valve leakage 30 5.4.1 Eddystone 30 5.4.2 Red Eagle 31 5.4.3 Maintenance 31 5.5 Use of ship’s service air 31 5.6 Protection Systems 31 5.6.1 Vent valves 31 5.6.2 Leakage alarms 32 5.7 Ambiguity of guidance 32 5.7.1 Hydrostatic testing of high pressure cylinders 32 5.7.2 Cylinder valve testing, inspection and maintenance 33 5.7.3 Summary 34 5.8 Service suppliers 34 SECTION 6 - CONCLUSIONS 36 6.1 Safety issues directly contributing to the accident that have been addressed or resulted in recommendations 36 SECTION 7 - ACTION TAKEN 37 7.1 Actions taken by other organisations 37 SECTION 8 - RECOMMENDATIONS 38
FIGURES
Figure 1
CO2 cylinder pressure and temperature relationship
Figure 2
Eddystone’s CO2 room: bank A
Figure 3
Schmöle cylinder valve
Figure 4
Eddystone’s CO2 room: bank B
Figure 5
Bulging in outer skin of rubber hoses
Figure 6
Eddystone system drawing (inset: non-return valve in situ)
Figure 7
Non-return valve (A) and check valve (B)
Figure 8
Dense white cloud in CO2 room (inset: cylinder valve actuation head)
Figure 9
Red Eagle system drawing showing pressure switch
Figure 10
Trigger line
Figure 11
DAB D10963 1/2” CO2 cylinder valves with D10964 manual/pneumatic actuator with detent Figure 12a - Leaking DAB valve 97056 Figure 12b - Evidence of corrosion Figure 12c - Evidence of cleaning with wire wheel Figure 12d - Brass particles embedded in seating face TABLES
Table 1
Effect of CO2 on human physiology ANNEXES
Annex A
DAB Inspection Report – Red Eagle – 31st July 2017
Annex B
IMO circular - MSC.1/Circ.1318
Annex C
Fire Industry Association guidance note
Annex D
UR Z17 - Procedural Requirements for Service Suppliers
Annex E
MCA Safety Bulletin No. 12
GLOSSARY OF ABBREVIATIONS AND ACRONYMS
ADR
European Agreement Concerning the International Carriage of Dangerous Goods by Road
Barber
Barber Brothers Limited
BS
British Standard
CO2
Carbon dioxide
DAB
DAB Fire Engineering Company Ltd
EN
Normes Européennes (European Standard)
DNV GL
Det Norske Veritas – Germanisher Lloyd
EPA
Environmental Protection Agency
FIA
Fire Industry Association
FSS Code
International Code for Fire Safety Systems
GFT
Griffin Fire & Training Limited
HSE
Health and Safety Executive
IACS
International Association of Classification Societies
IMO
International Maritime Organization
ISO
International Organization for Standardization
kg
kilogram
LR
Lloyd’s Register
MARS
Mariners’ Alerting and Reporting Scheme
MCA
Maritime and Coastguard Agency
MOD
UK’s Ministry of Defence
MSC
Maritime Safety Committee
MSIS
Merchant Ships Instructions to Surveyors
Nm
Newton metres Ocean Safety - Ocean Safety Limited
RESMAR
RESMAR Limited
Ro-ro
Roll on, roll off
SOLAS
International Convention for the Safety of Life at Sea 1974, as amended
UR
Unified Requirement
USCG
United States Coast Guard GLOSSARY OF TECHNICAL TERMS
CO2 cylinder
Container for storing CO2 under pressure
Cylinder valve
The valve fitted on a cylinder, which is opened either manually or through the action of gas when CO2 is required for extinguishing fire
Bank
The set of CO2 cylinders designated for release into a space
Busting disc
A diaphragm that is designed to rupture at a pre-determined pressure
Check valve
A valve that restricts the flow of the medium to one direction. For the purpose of this report, check valves are not spring-loaded
Master cylinder
A cylinder that is activated first, causing the CO2 gas to enter the trigger line to discharge the remaining designated cylinders Non-return valve - A valve that restricts the flow of the medium in one direction. For the purpose of this report, non-return valves are spring-loaded
Pilot cylinder
A cylinder containing gas (usually CO2 or nitrogen) and stored in an enclosure separate and remote from the main CO2 cylinders
Pilot line
The piping system that leads the gas from the pilot cylinder(s) to the CO2 cylinder bank
Remote release
The means to discharge CO2 into a compartment on fire that is located away from the room containing the CO2 cylinders
Trigger line
The piping system that leads CO2 from the master cylinder(s) to activate the remaining cylinders in the bank TIMES: all times used in this report are ship’s time (UK summer time UTC+1 for Red Eagle and UTC+3 for Eddystone)
Eddystone Red Eagle
1 SYNOPSIS On 8 June 2016, the roll on, roll off cargo vessel Eddystone experienced an unintentional release of carbon dioxide from its fixed fire-extinguishing system while on passage in the Southern Red Sea. A similar incident took place on 17 July 2017 on board the roll on, roll off passenger ferry Red Eagle while on passage from the Isle of Wight to Southampton. In both cases, the engine room distribution valve for the carbon dioxide gas remained closed and gas leaked out into the compartment where the carbon dioxide cylinders were stored. Fortunately, no one was harmed in either of these incidents. However, a report issued by the UK Health and Safety Executive stated that the unintended release of carbon dioxide from fire-extinguishing systems caused 72 deaths and 145 injuries, mainly in the marine industry, between 1975 and 2000. In both incidents, the release of carbon dioxide was found to be the result of malfunctioning cylinder valves. The MAIB investigation revealed that maintenance of the fire-extinguishing systems had been inadequate, and that the available guidance for the marine industry on the maintenance and inspection of carbon dioxide fixed fire-extinguishing systems was insufficient. The Maritime and Coastguard Agency has issued a safety bulletin to the operators of all UK registered vessels regarding the appropriate maintenance of carbon dioxide fixed fire- extinguishing systems. This bulletin clarifies the UK administration’s position with respect to the application of the international requirements for the testing of gas cylinders. AW Ship Management (Eddystone’s manager) and Red Funnel (Red Eagle’s owner/ manager) have replaced the components that contributed to these incidents on the sister vessels in their fleets. Recommendations have been made to: • The Maritime and Coastguard Agency, to seek clarification from the International Maritime Organization of the maximum permitted periodicity between hydrostatic testing of individual high pressure cylinders (MSC.1/Circ.1318); and, to ensure that all safety devices fitted to carbon dioxide fixed fire-extinguishing systems are maintained and surveyed appropriately. • Det Norske Veritas – Germanischer Lloyd and Lloyd’s Register, to raise with the International Association of Classification Societies the issue of the quality of service provided by approved service suppliers in the maintenance of carbon dioxide fixed fire-extinguishing systems. • The owners of Red Eagle, to review the design of the carbon dioxide fire-extinguishing systems fitted to their vessels where the leakage of a single cylinder valve causes the entire system to discharge.
2 SECTION 1 - BACKGROUND 1.1 FIXED FIRE-EXTINGUISHING SYSTEMS The International Convention for the Safety of Life at Sea 1974, as amended (SOLAS) required machinery spaces of category A1 to be protected by a permanently installed fixed fire-extinguishing system that uses one of the following as the extinguishing medium: a. Gas b. High expansion foam c. Water-spray. Carbon dioxide (CO2) is an inexpensive, widely available, effective fire-extinguishing medium and is used for most marine applications where gas is the chosen medium. 1.2 CARBON DIOXIDE (CO2) AS A FIRE-EXTINGUISHING MEDIUM 1.2.1 Properties of CO2 CO2 is odourless, colourless and exists in gaseous form at atmospheric pressures and temperatures. CO2 has a high rate of expansion, enabling large areas to be flooded quickly. It is non-flammable and does not support combustion. When released into a confined space, a concentration of 20% or more CO2 is sufficient to displace the lighter oxygen molecules, smothering any fire. However, it provides almost no cooling effect and there is a risk of re-ignition if the space is subsequently vented before it has had sufficient time to cool. Above the critical temperature of 31.1°C, CO2 cannot be liquified by the application of pressure. A typical fire-extinguishing system cylinder at 20°C will have a vapour pressure of approximately 57 bar; this will rise to 74 bar at the critical temperature. Further increase in temperature will lead to increased pressure within the cylinder (Figure 1). CO2 will permeate through rubber at approximately five times the rate of air2. 1.2.2 Effect of CO2 on human physiology The main drawback of CO2 as a fire-extinguishing medium is that the amount required to suppress a fire is higher than the amount required to cause harm to human beings. Above a concentration of 10% it causes unconsciousness, followed by death. At concentrations of 17% and above, survival time is less than a minute (Table 1). 1 Machinery spaces of category A are those spaces and trunks to such spaces that contain either: 1. internal combustion machinery used for main propulsion; 2. internal combustion machinery used for purposes other than main propulsion where such machinery has in the aggregate a total power output of not less than 375kW; or 3. any oil-fired boiler or oil fuel unit, or any oil-fired equipment other than boilers, such as inert gas generators, incinerators, etc. 2 J.D. Edward & S.F. Pickering, 1920, Permeability of rubber to gases.
3 3 Shortness of breath Image courtesy of https://www.epa.gov/snap/carbon-dioxide-fire-suppressant-examining-risks Table 1: Effect of CO2 on human physiology Figure 1: CO2 cylinder pressure and temperature relationship
4 SECTION 2 - FACTUAL INFORMATION: EDDYSTONE 2.1 PARTICULARS OF EDDYSTONE AND INCIDENT SHIP PARTICULARS Vessel’s name Eddystone Flag UK Classification society Lloyd’s Register IMO number 9234070 Type Ro-ro cargo Registered owner Foreland Shipping Limited Manager(s) AW Ship Management Limited Construction Steel Year of build 2002 Length overall 193.0m Gross tonnage 23235 Authorised cargo Military equipment VOYAGE PARTICULARS Port of departure Jeddah, Saudi Arabia Port of arrival Duqm, Oman Type of voyage International Cargo information Military equipment Manning 21 MARINE CASUALTY INFORMATION Date and time 8 June 2016 at 1625 Type of marine casualty or incident Marine incident Location of incident 13 28.4 N; 042 37.4 E, Southern Red Sea Place on board CO2 room Injuries/fatalities None Damage/environmental impact None Ship operation Normal service Voyage segment Transit Internal and external environment Ambient air temperature 32°C, calm sea Persons on board 30
5 2.2 NARRATIVE 2.2.1 Incident At 1625 on 8 June 2016, while the roll on, roll off (ro-ro) cargo vessel Eddystone was in the Southern Red Sea on passage to Duqm, Oman, the fixed fire-extinguishing system’s CO2 release alarm sounded. The engine room had been changed over to unmanned machinery space watchkeeping mode but the second engineer, who was on duty that day, was in the engine room at the time, attending to a purifier alarm. He telephoned the chief engineer to apprise him of the situation and remained in the engine control room, which was separated from the engine room. The main engine, generators and engine room vent fans all continued to operate normally. The chief engineer and the electrotechnical officer inspected the remote CO2 release station and saw that it was undisturbed. They then went to the door of the CO2 room, where they heard a loud hissing noise from within. The chief engineer informed the master, who sent the chief officer to assist them. The chief engineer and chief officer donned breathing apparatus and entered the upper level of the CO2 room, which contained the 65 CO2 cylinders that comprised bank A4 of the vessel’s fixed fire-extinguishing system (Figure 2). A white cloud was seen forming at the far corner of the compartment and all the cylinder valves (Figure 3) were in the open position. They then went down to the lower level, where the reserve set of 65 CO2 cylinders comprising bank B (Figure 4) were located. All of bank B’s cylinder valves were in the closed position. 4 Eddystone’s CO2 cylinders were stored as two independent banks, A and B. Figure 2: Eddystone's CO2 room: bank A Safety pin Trigger line To bank B Rubber CO2 outlet hose CO2 manifold
6 Figure 3: Schmöle cylinder valve Over centre linkage Set screw Valve spindle Valve lid Over centre linkage Set screw Bursting disc Actuator plunger Pilot/ trigger line To manifold Valve in closed position Valve in open position
7 To prevent the release of CO2 from bank B, the chief engineer disconnected the pilot activation lines to both banks of cylinders and left bank B in the manual activation mode, allowing it to be activated from within the CO2 room if required. CO2 gas from bank A continued to leak from a few failed cylinder outlet rubber hoses over the next 4 days, during which time most of the rubber hoses in bank A developed bulges in their outer skin (Figure 5). 2.2.2 System reinstatement On 19 June, when Eddystone called at Bahrain, after Duqm, a CO2 fire-extinguishing system specialist attended the vessel. All four pilot cylinders and the cylinders of bank B were weighed to confirm they contained the full charge of gas. After carrying out visual checks on all the components, the pilot cylinders were reconnected and the system was put back in service with bank A isolated. The vessel then continued its planned voyage to Marchwood, UK. When Eddystone reached Marchwood, RESMAR Limited (RESMAR), the company contracted by the managers of Eddystone to carry out the annual inspection and maintenance of the CO2 fire-extinguishing systems on the vessels in their fleet, attended the vessel with its subcontractor, Barber Brothers Limited (Barber). All the cylinders from bank A were transported to Barber’s facility in Birmingham, refilled and returned to the vessel. Between 28 July and 2 August RESMAR replaced eight check valves and one non-return valve that had been identified to be leaking, and renewed all the rubber hoses in both banks. Figure 4: Eddystone's CO2 room: bank B Engine room distribution valve Figure 5: Bulging in outer skin of rubber hoses Bulging outer skin
8 2.3 COMPANY, VESSEL AND CREW 2.3.1 Company and vessel Eddystone was one of six sister vessels built for the transport of military cargoes and vehicles. Eddystone and three other sister vessels were owned by Foreland Shipping Limited and managed on their behalf by AW Ship Management Limited. All the vessels were on charter to the UK’s Ministry of Defence (MOD) and plied regularly between Marchwood, UK, and ports in the Middle East. 2.3.2 Crew and other personnel At the time of the incident, there were 21 crew members and nine military personnel on board Eddystone. All were UK nationals. The manning on board exceeded the MCA’s minimum safe manning requirements. 2.4 FIRE-EXTINGUISHING SYSTEM DESCRIPTION 2.4.1 Configuration The MOD required a fully redundant fixed fire-extinguishing system for the engine room, so all six sister vessels had been fitted with an additional bank of CO2 cylinders. Eddystone’s system had been supplied by Tyco Engineering Services, and comprised two banks, A and B, each of 65 cylinders including two master cylinders. There were also two remote release stations, each containing two pilot cylinders and capable of operating either bank (Figure 6). In operation, the gas from the pilot cylinders was routed through two independent lines: one for opening the engine room distribution valve and the other for activating the master cylinders of the chosen bank. The CO2 from the master cylinders released into the manifold through a spring-loaded non-return valve at the end of the cylinder rubber outlet hose. At the cylinder end of the non-return valve, a T-branch was fitted through which the gas was led, via the trigger line, to the release mechanism to trigger the remaining cylinders in the bank. Every tenth cylinder in each bank had a similar arrangement to maintain the trigger line pressure. The gas from each of the remaining cylinders was released to the manifold through a check valve, which consisted of a ball valve maintaining the seal by the weight of the ball. Check valves were not spring-loaded (Figure 7). 2.4.2 Protection To prevent an accidental release of CO2, the pilot lines were fitted with vent valves set to remain open normally and to close if the pressure exceeded 1.5 bar. In the event of leakage through the pilot cylinders’ valves, the vent valves would prevent gradual pressure build-up in the pilot lines that might otherwise lead to the cylinder valves being triggered. The manifold was fitted with a pressure switch designed to trigger an alarm if minor leaks from the cylinder valves caused the pressure in the manifold to rise. This pressure switch was not shown in the system drawing. During a visit to the vessel by MAIB inspectors on 24 August 2017, the chief engineer removed the pressure switch, which had a stated range of 0 to 10 bar, and tested it; it was found to be set at 12 bar. To protect the main CO2 manifold from extreme overpressure, the manifold was also fitted with a pressure relief valve set to open at 120 bar.
9 Figure 6: Eddystone system drawing (inset: non-return valve in situ) Vent valve Check valve Non-return valve Key Pilot line Main CO2 manifold Trigger line Bank A Bank B Relief valve
10 2.4.3 Cylinder valves The system’s main CO2 cylinders were all fitted with Schmöle5 K85-50 cylinder valves (Figure 3). The internal mechanism of these valves consisted of a valve spindle and valve lid sealing against the seat. The seat sealing surface was made of polyether ether ketone or PEEK, a synthetic material with high resistance to thermal, chemical and aqueous degradation. The valve was kept closed by an over-centre linkage tensioned by a set screw acting on the top of the valve spindle. To ensure that the valves remained closed irrespective of the ambient temperature and the associated variation of cylinder pressure, the manufacturer required this set screw to be tightened to between 10Nm and 11Nm at installation. These valves also provided a bursting disc diaphragm to protect the cylinder against extreme overpressure. 5 Now owned by VTI Ventil Technik GmbH. A B Figure 7: Non-return valve (A) and check valve (B)
11 The Schmöle valves were designed to be operated either manually, using the operating lever, or remotely, via the application of a minimum pneumatic pressure of 20 bar through the pilot or trigger line to the valves activation plunger mechanism. The tightening torque of the valve body to the cylinder was required to be between 160Nm and 180Nm. The manufacturer’s instruction manual stated that the valves did not have any design-related restrictions regarding their service life, and were fit for 100 releases. 2.5 INSPECTION AND MAINTENANCE Before the incident, between 2 and 5 October 2015, RESMAR carried out the annual inspection and maintenance of Eddystone’s fixed fire-extinguishing system. In December 2015, it also replaced eight cylinders with pressure tested cylinders in compliance with the generally understood requirement to hydrostatically pressure test 10% of cylinders every 10 years. During the annual inspection and maintenance, the ship’s service air, supplied directly from the main air receiver through a reduction valve set to approximately 7 bar, was used to blow through the system and pressure test the main manifold. The cylinder valves were visually inspected, and all gas cylinders were checked with liquid level detectors to ensure they contained their full charge of CO2. When MAIB inspectors visited Eddystone in August 2017, RESMAR technicians working on board reported that the service air pressure was insufficient to trigger the leakage alarm pressure switch. Neither Barber nor RESMAR were able to provide any documentary evidence to confirm that the valve set screws had been set to the required torque at any time before or after the incident.
12 SECTION 3 - FACTUAL INFORMATION: RED EAGLE 3.1 PARTICULARS OF RED EAGLE AND INCIDENT SHIP PARTICULARS Vessel’s name Red Eagle Flag UK Classification society Not applicable IMO number 9117337 Type Ro-ro cargo ferry Registered owner Southampton Isle of Wight & South of England Royal Mail Steam Packet Company Limited (known as Red Funnel) Manager(s) Southampton Isle of Wight & South of England Royal Mail Steam Packet Company Limited Construction Steel Year of build 1996 Length overall 93.22m Gross tonnage 4075 Authorised cargo Passengers and vehicles VOYAGE PARTICULARS Port of departure East Cowes Port of arrival Southampton Type of voyage Internal waters Cargo information 57 passengers, 34 vehicles Manning 8 crew members MARINE CASUALTY INFORMATION Date and time 17 July 2017 at approximately 0435 Type of marine casualty or incident Marine incident Location of incident Solent (off Bramble Banks) Place on board CO2 room Injuries/fatalities None Damage/environmental impact None Ship operation Normal service Voyage segment Transit Internal and external environment CO2 room temperature 18°C, calm sea Persons on board 65
13 3.2 NARRATIVE 3.2.1 Incident At 0420 on 17 July 2017, the ro-ro ferry Red Eagle departed East Cowes, Isle of Wight, bound for Southampton. Approximately 15 minutes after departing, the CO2 release alarm sounded in the engine room. The chief engineer and mechanic, who were in the engine control room at the time, ran out of the space, exiting onto the vehicle deck immediately above. The CO2 room and its remote release station were located on opposite sides of this deck. The chief engineer inspected the remote CO2 release station and saw that it was undisturbed. He then went to the door of the CO2 room, where he heard a loud hissing sound from within. He opened the door to the room slightly, and through a very small opening saw a dense white cloud inside (Figure 8). The chief engineer telephoned the bridge and discussed the situation with the master. They concluded that no emergency response was required other than ensuring that no one entered either the CO2 room or the engine room. The master then telephoned Griffin Fire & Training Limited (GFT), who were contracted to maintain the CO2 fire-extinguishing systems on the company’s ro-ro ferries, and asked them to attend the vessel as soon as possible. He also informed the vessel’s owners, who in turn notified the MCA. Red Eagle berthed at 0515 and, after disembarking the passengers and their vehicles, moved to a layby berth nearby. The vessel was taken out of service pending the restoration of the CO2 system. A GFT technician arrived on board at 0630 and, having donned breathing apparatus, went inside the CO2 room to investigate. He could hear several of the cylinder valves rattling due to the back pressure in the outlet manifold, and CO2 still leaking into the room from some of the cylinder outlet hose to manifold connections (Figure 8). To prevent further discharge of gas, the technician removed all the cylinder valve actuation heads (Figure 8 inset). An MCA surveyor arrived on board later that morning. At the request of the surveyor, the GFT technician proved that neither the remote nor local release mechanism for the CO2 system had been activated to cause the cylinders to discharge. 3.2.2 System reinstatement All 26 of the system’s CO2 main cylinders and the pilot cylinder were sent to Ocean Safety Limited (Ocean Safety), subcontractors to GFT. Ocean Safety established that the two master cylinders and the pilot cylinder contained their full charge; six cylinders had completely discharged and the remaining cylinders were partially discharged. They were unable to establish which cylinder valve had leaked, causing the system to discharge. Ocean Safety emptied and pressure tested all the CO2 cylinders, examining and refurbishing the cylinder valves as required. It was during the process of refilling the cylinders that the MCA asked the vessel’s owners to replace all the cylinder valves as the valve that had caused the leakage could not be identified. Ocean Safety then ordered 26 new cylinder valves from DAB Fire Engineering Ltd (DAB) in York. The filled cylinders were emptied and refilled with the new valves fitted, and the vessel returned to normal service on 21 July after the system had been reinstated.
14 The final report by GFT following its reinstatement of the CO2 system stated: A new 10-370 bar latching pressure switch was fitted to the manifold. This was tested and witnessed by the MCA representative. The MAIB subsequently pointed out that the purpose of this pressure switch was to raise an alarm in the event of the manifold becoming pressurised to 1 bar as a result of leakage past cylinder valves. The new pressure switch was not in accordance with the system drawing and could not raise the alarm before the system was Figure 8: Dense white cloud in CO2 room (inset: cylinder valve actuation head) Frosted union of check valve
15 triggered. GFT responded that they did not have the system drawings for Red Eagle. GFT later reported that they were unable to find a pressure switch of the right specification and was directed by the MAIB to report the matter to the MCA. GFT was subsequently informed by the CO2 system manufacturer that the original pressure switch had been unavailable since 2013 and that the pressure switch GFT had fitted was correct. 3.3 COMPANY, VESSEL AND CREW 3.3.1 Company Red Eagle was owned and operated by The Southampton Isle of Wight and South of England Royal Mail Steam Packet Company Limited, commonly known as Red Funnel. Red Eagle was one of three Raptor class sister vessels employed on a regular passenger, vehicle and freight transportation service between the Isle of Wight and Southampton. Red Funnel also operated a foot passenger only service between the Isle of Wight and Southampton with four high speed catamarans. 3.3.2 Vessel and crew Between 2003 and 2005, the three Raptor class vessels in the Red Funnel fleet were lengthened at Remontowa shipyard in Gdansk, Poland. Red Eagle was the last vessel to be extended. Due to the increased volume of the engine room resulting from the extension work, the fixed fire-extinguishing system needed an additional six CO2 cylinders to be added to the existing 20. Following this work, the main CO2 manifold up to the engine room distribution valve was pressure tested to 122 bar as required by Lloyd’s Register (LR), the classification society that witnessed and surveyed the work. The vessel’s crew comprising the master, mate, engineer, mechanic and four deck ratings satisfied the MCA’s safe manning requirements. 3.4 FIRE-EXTINGUISHING SYSTEM DESCRIPTION 3.4.1 Configuration Red Eagle’s fixed fire-extinguishing system was supplied by Wormald Engineering (later part of Tyco Engineering Services) and comprised 26 cylinders, including two master cylinders. The remote release station, which contained the pilot CO2 cylinder, was located on vehicle deck E, the deck above the engine room. In operation, the pilot gas was routed through two independent lines: one for opening the engine room distribution valve and the other for activating the master cylinders. The CO2 from the master cylinders released into the manifold through check valves at the end of the cylinder outlet hoses (Figure 9). From the end of the manifold, gas was led via the trigger line to the release mechanism of each cylinder valve in turn, causing them to open and release into the manifold through a check valve (Figure 10). The trigger line was not separated from the manifold as in the system on Eddystone.
16 Figure 9: Red Eagle system drawing showing pressure switch Check valve Key
17 3.4.2 Protection No part of the system was fitted with a vent valve to protect from gradual pressure build-up caused by leaking cylinder valves. The manifold was fitted with a widely available Danfoss KPS 33 pressure switch, designed to trigger the CO2 release alarm in the event of minor leaks from the cylinder valves as well as act as a CO2 discharge alarm. This pressure switch had a stated range of 0 to 3.5 bar and was to be set to break at 1 bar rising (Figure 9). To protect the main CO2 manifold from extreme overpressure, the manifold was also fitted with a bursting disc designed to rupture at 190 bar. 3.4.3 Cylinder valves The system’s main CO2 cylinders were all fitted with DAB D10963 1/2” CO2 cylinder valves (Figure 11), each of which had a D10964 manual/pneumatic actuator with detent fitted on top. When activated by pilot gas pressure or the manual release mechanism, the servo piston was pushed down, causing the firing pin to push the pilot seat down, opening the pilot valve. This allowed cylinder pressure to enter the top of the valve seat (made of a synthetic material called Nylon 6), pushing it Figure 10: Trigger line Trigger line CO2 manifold Check valve
18 Figure 11: DAB D10963 1/2" CO2 cylinder valves with D10964 manual/pneumatic actuator with detent Balance chamber Bursting disc Pilot seat Servo piston CO2 cylinder pressure Firing pin Valve seat Valve Valve Actuator head
19 further down until the detent on the actuator locked, keeping the valve open. These valves also provided a bursting disc diaphragm to protect the cylinder from extreme overpressure. A small hole had been drilled into the side of the servo piston, allowing the escape of any gas that might have become trapped within it. A restrictor wire inserted into this hole served to reduce the cross-sectional area of the hole to the required aperture. In DAB valves manufactured before 2000, this restrictor wire was made of copper. With the exception of the valve seat, all other internal components and the body of the valves were made of brass and stainless steel. The actuators fitted to the top of the valves were designed to be operated either manually, using the operating lever, or remotely, via the application of pneumatic pressure through the pilot or trigger line to the actuator. The instructions for the DAB actuator stated that a minimum pneumatic pressure of 31 bar was required to open it, when the cylinder pressure was between 45 and 50 bar. During the tests carried out at DAB, it was observed that an activation pressure of 4.1 bar was sufficient to activate the valve with a cylinder pressure of 50 bar (simulated with nitrogen gas). Although the valves were designed to be serviced, the manufacturer’s instruction manual stated: ‘DAB do not recommend that CO2 valves be serviced or refurbished in the field’. 3.5 INSPECTION AND MAINTENANCE On 9 June 2016, GFT replaced three cylinders with pressure tested cylinders in compliance with the generally understood requirement to hydrostatically pressure test 10% of cylinders every 10 years. On 19 December 2016, GFT completed the annual inspection and maintenance of Red Eagle’s fixed fire-extinguishing system. Following a visual inspection of the cylinder valves, which did not raise any concern, all the cylinder valve actuators were removed and proved to be working by pressurising the main manifold with dry compressed air. The system’s pressure switch activated when the manifold was pressurised. The pressure switch set point was not checked at the time. Prior to the incident on Red Eagle, Ocean Safety believed that DAB had ceased trading, and so refurbished cylinder valves on the three Raptor class vessels with spare parts held at its workshop. No records were maintained of these refurbishments. 3.6 TESTS CARRIED OUT 3.6.1 Cylinder valves’ leak test Following the accidental release of CO2, DAB tested all 26 cylinder valves from Red Eagle. The MAIB witnessed these tests. Nitrogen at 50 bar was applied to the cylinder side of the valves and the outlets were monitored for leakage using soap solution. Of the 26 valves tested, two (serial numbers 37017 and 97056) were found to be leaking.
20 The leakage from valve 97056 was very small. The bubble formed in the soap solution during testing took a few seconds to burst (Figure 12a). On dismantling this valve, evidence of corrosion was apparent (Figure 12b) and the DAB report of the tests (Annex A) stated: When valve 97056 was disassembled, it was noted that the outlet side of the valve was heavily discoloured internally and rust had formed in the outlet. As the valve is manufactured from brass and stainless steel it was surmised that the rust had come from the discharge hose fitting which are normally manufactured from zinc plated steel. [sic] The report also noted that the bonnet assembly showed signs of pitting associated with being cleaned with a wire wheel, or similar. The valve had obviously been disassembled previously during its service life (Figure 12c). With regard to the source of the leak, the seating area of the valve seat was found to have small particles, subsequently identified as brass, embedded in it (Figure 12d). The DAB report stated: From experience, this brass swarf was the most likely cause of the leak. The leak however, was so slight that it would have taken many months if not longer for the leak to build up pressure inside the manifold and discharge the system. The report concluded: Once a pressure of 60 PSI6 is achieved in the manifold the first of the valves would start to open causing a cascade effect in the rest of the system opening the remaining 25 valves. The leakage from valve 37017 was severe and, when the valve was dismantled, a piece of the copper restrictor wire from the servo piston was found to have lodged open the pilot cone of the valve seat. The DAB report stated that this could only have occurred when the system was activated. DAB confirmed that, based on the serial numbers of the cylinder valves, 20 had been supplied before the year 2000 and six additional valves were supplied in 2006 when the vessel was extended. 3.6.2 Pressure switch test The Danfoss KPS 33 pressure switch fitted to the CO2 manifold was examined by a local company specialising in pressure switch calibration. It found that: ● ●The switch was set to open at 0 bar rising ● ●Upon application of pressure up to 4 bar, the switch did not operate ● ●The lower diaphragm appeared to be contorted ● ●The upper plate that the mechanism attached to was bent upwards. 6 60 PSI = 4.14 bar.
21 Figure 12a: Leaking DAB valve 97056 Figure 12c: Evidence of cleaning with wire wheel Figure 12d: Brass particles embedded in seating face Brass particles embedded in seating face Figure 12b: Evidence of corrosion Corrosion
22 SECTION 4 - COMMON TOPICS 4.1 SAFER ALTERNATIVES TO CO2 Fixed fire-extinguishing systems that use CO2 pose a significant risk to human life if used within a confined space. Safer, alternative systems have therefore been developed, and shore-based fixed fire-extinguishing systems are increasingly using: Argogen (IG55), Argonite (IG55), Inergen (IG541), FM200 and NOVEC 1230. The document entitled ‘Fire protection standard for UK power networks operational sites’ was published in January 2016 by UK Power Networks. It set out to provide guidance on the broad fire safety legislative responsibilities and current fire safety standards as well as maintaining best practice from previous documentation concerning fire protection of UK power networks’ operational sites. It stated: Where gaseous fixed fire extinguishing systems are installed it is preferred that Carbon Dioxide is not used. 4.2 REGULATIONS AND GUIDANCE 4.2.1 International requirements SOLAS refers to the International Code for Fire Safety Systems (FSS Code) for the technical requirements of fixed gas fire-extinguishing systems. The FSS Code requires all gas-based fixed fire-extinguishing systems to be fitted with an audible and visual warning of the release of gas into spaces where personnel normally work or have access. For machinery spaces protected by CO2 systems, the FSS Code requires that 85% of the CO2 shall be discharged within 2 minutes, to cover 35%7 of the gross volume of the largest machinery space protected, including the engine casing. Red Eagle was categorised as a Class IV passenger ship engaged only on voyages in inland waters. Class IV vessels were required to comply with Statutory Instrument (SI) 1998 No.1011, The Merchant Shipping (Fire Protection: Small Ships) Regulations
- The requirements for fixed gas systems were contained in MSN 1666, The
Merchant Shipping (Fire Protection) Regulations 1998, which formed an integral part of SI 1998 No.1011. The requirements set out in MSN 1666 did not include maintenance and testing routines as the MCA deferred to the International Maritime Organization’s circular MSC.1/Circ 13188 (Annex B), published in June 2009, for guidance on this subject. 4.2.2 Cylinder valves MSC.1/Circ.1318 aimed to provide the minimum recommended level of maintenance and inspections for fixed carbon dioxide fire-extinguishing systems on all ships, and are intended to demonstrate that the system is kept in good working order as specified in SOLAS regulation II-2/14.2.1.2. It listed the requirements and provided checklists for use by service suppliers to maintain a record of their inspections and maintenance. MSC.1/Circ.1318 stated that maintenance and inspections should be carried out in accordance with the manufacturer’s instructions, and listed monthly 7 or 40% of the gross volume excluding casings as defined in section 2.2.1.3 of FSS Code, whichever is larger. 8 MSC.1/Circ.1318,‘Guidelines for the maintenance and inspections of fixed carbon dioxide and fire- extinguishing systems’.
23 and annual checks that should be conducted. It further stated that biennially for passenger ships and at intermediate, periodic or renewal surveys of all other ship types, the following maintenance, inter alia, should be carried out: ● ●The hydrostatic test date of all storage containers should be checked. ● ●High pressure cylinders should be subjected to periodical tests at intervals not exceeding 10 years. At the 10-year inspection, at least 10% of the total number provided should be subjected to an internal inspection and hydrostatic test** The asterisks in the quote above refer to a footnote to the International Organization for Standardization (ISO) Standard, Gas cylinders – Seamless steel gas cylinders – Periodic inspection and testing, ISO 6406. The standard states that if a valve is to be reintroduced on to a cylinder, it shall be inspected and maintained to ensure optimal performance. A recommended maintenance plan is then outlined in an annex to the standard, and includes the following: Maintenance of the valve should include general cleaning, together with replacement of elastomers and worn or damaged components, packing and safety devices, where necessary. However, ISO 6406 refers to EN 14189 Transportable gas cylinders. Inspection and maintenance of cylinder valves at time of periodic inspection of gas cylinders, now replaced by BS EN ISO 22434:2011, Transportable gas cylinders – Inspection and maintenance of cylinder valves. This standard provides further guidance on external examination with the cylinder valve both in situ and removed from the cylinder. It states that if external examination reveals no defects or anomalies, the valves may be reintroduced into service. The MCA’s Merchant Ships Instructions to Surveyors (MSIS) stated: If the fixed CO2 cylinders are found to be in a very good condition at the 10 year interval, then the MCA will accept the hydrostatic test requirements specified in MSC/Circular 1318 paragraph 6.1.2, provided that all cylinders are tested within a 20 year maximum period. 4.2.3 System testing MSC.1/Circ.1318 under the heading Minimum recommended maintenance states: the discharge piping and nozzles should be tested to verify that they are not blocked. The test should be performed by isolating the discharge piping from the system and flowing dry air or nitrogen from test cylinders or suitable means through the piping. It also states under Example Service Charts: Manifold tested for leakage, by applying dry working air. Det Norske Veritas – Germanischer Lloyd (DNV GL) Class Guidelines CG-0058 re-iterate these requirements under Maintenance of safety equipment, which state that CO2 lines and nozzles should be blown through with dry air or nitrogen to confirm that they are not blocked.
24 Land-based guidance also requires the use of nitrogen or a suitable alternative in British Standard BS 5306-4 Fire-extinguishing installations and equipment on premises – Part 4: Specification for carbon dioxide systems which provides the following guidance: After assembly, the system shall be thoroughly blown through with nitrogen or suitable alternative … 4.2.4 Land-based installations: requirements for CO2 cylinders and cylinder valves In November 2015 the United Kingdom Fire Industry Association (FIA) published Guidance on the periodic testing of transportable gas containers used in fire- extinguishing systems (Annex C). This guidance gave recommendations on how fire-extinguishing system containers should be treated. Within the UK, the design, manufacture, inspection and test, and transport of dangerous goods, including transportable pressure equipment, is governed by the Carriage of Dangerous Goods and Use of Transportable Pressure Equipment Regulations. These regulations implement the European Transportable Pressure Equipment Directive and the European Agreement Concerning the International Carriage of Dangerous Goods by Road (ADR). FIA’s guidance refers to instruction P200 of ADR, which specifically requires CO2 cylinders to be pressure tested at 10-yearly intervals to 190-250 bar. The United States National Fire Protection Agency imposes the requirement for hydrostatic testing of all cylinders which are discharged after 5 years of the last test and imposes a maximum limit of 12 years between hydrostatic tests. On cylinder valves, the FIA guidance states: For safety reasons container [cylinder] valves should not be reused after removal from containers unless the following conditions are met: ● ●The valve has been refurbished in accordance with manufacturer’s recommendations ● ●The connection thread to the container and discharge hose are inspected to ensure they are within tolerance and undamaged. The guidance notes that, where cylinder valves have a taper thread, they are often found to be unfit for reuse after a single fitment and removal due to the distortion of the brass thread when tightened against the steel cylinder. ISO 6183, Fire protection equipment -- Carbon dioxide extinguishing systems for use on premises -- Design and installation, states that CO2 is no longer recommended for use in normally occupied spaces. Similarly, the National Fire Protection Agency of the United States of America recommends that CO2 should not be used in new total flooding systems for spaces that are normally occupied.
25 4.2.5 Approval of service suppliers The International Association of Classification Societies (IACS) provides guidance for the approval of service suppliers in Unified Requirement (UR) Z17, Procedural Requirements for Service Suppliers (Annex D). UR Z17 defines a service supplier as: A person or company, … provides services for a ship or a mobile offshore drilling unit such as measurements, tests or maintenance of safety systems and equipment, the results of which are used by surveyors in making decisions affecting classification or statutory certification and services. UR Z17 defines a subcontractor as: A Person or Company providing services to a Manufacturer or approved/ recognized service supplier, with a formal contract defining the assumption of the obligations of the service supplier. UR Z17 has detailed requirements on the training, personnel and quality systems of the service supplier, which are also applicable to their subcontractors (except those only providing equipment). It also requires the classification society that is providing the approval to audit the service supplier every 5 years. Firms engaged in servicing fixed fire-extinguishing systems are not required to be approved by the system’s manufacturer, but need to demonstrate an understanding of the principles involved with gas, foam, deluge, sprinkler and water mist systems, as relevant for the approval being sought. Access to system drawings, manufacturers’ instruction manuals and bulletins is required for the service supplier and nominated subcontractors. The service supplier approval certificates (for the inspection and maintenance of portable fire extinguishers, and gas and foam type fixed fire-extinguishing systems) were issued to RESMAR by Lloyd’s Register (LR), and to GFT by DNV GL. Eddystone had been serviced by GFT from September 2010 to October 2013 and by RESMAR from 2014 onwards. GFT had been Red Eagle’s service supplier since the vessel entered service. 4.3 PREVIOUS ACCIDENTS 4.3.1 Published reports There are several published reports concerning the release of CO2 from fixed fire- extinguishing systems. In 2004, the release of 5 tonnes of CO2 on board the Hong Kong registered containership YM People9 killed the vessel’s master, chief engineer, chief officer and third engineer. All the deceased were in the CO2 room at the time and were attempting to vent the manifold into which CO2 had inadvertently released while the chief engineer was preparing the system for inspection and maintenance. 9 Improper release of carbon dioxide on board M.V.”YM People” on 27.9.2004 causing four fatalities (https://www.mardep.gov.hk/en/publication/pdf/mai040927.pdf).
26 In 2010, the offshore support vessel Marsol Pride10 experienced a discharge of CO2 into the manifold due to a leaking Schmöle cylinder valve. Subsequently, the main engine room distribution valve developed a leak, which resulted in the engine room being flooded with CO2. Fortunately, there were no casualties. In 2011, a shore-based service engineer was seriously injured on board the tug SD Nimble11 when six cylinders of CO2 were accidentally discharged shortly after the tug had slipped from its berth. The engineer had been testing components of the vessel’s fixed CO2 fire-extinguishing system, in the CO2 room, without first disconnecting the system’s activation pilot line. The engineer lost consciousness, but was airlifted to a local hospital and recovered following a long period of recuperation and therapy. 4.3.2 Cases involving sister vessels to Eddystone Accidents on board two of Eddystone’s sister vessels were reported to the MAIB. These reports did not result in investigations by the MAIB, but the circumstances of the accidents as reported are outlined below: Sister vessel 1 of Eddystone In June 2017, technicians working on the CO2 fire-extinguishing system decided to pressure test the manifold after they noticed a corroded section on it. When they applied service air pressure to the manifold, all 65 cylinders in bank B of the system discharged into the manifold and leaked out through various unions between the cylinder outlet hoses and the manifold. There were no injuries. The subsequent investigation carried out by the chief engineer found that on 124 of 130 cylinders, the set screws on cylinder valves were not torqued to 11nm as required by the instruction manual for Schmöle valves. The service supplier, based in Barcelona, also carried out an investigation and reported as follows: CAUSES OF THE ACCIDENTAL RELEASE
- One of the Check valves from Master Cylinder was not working properly.
- The pilot loops from manifold check valves were not disconnected before apply
compressed air.
- The bolts for calibrating the CO2 valves of many cylinders were untightened (less
than 11 Nm). Because that even the valves were secured by safety pin some of them were partially released. [sic] 10 Report 10-203: Marsol Pride, uncontrolled release of fire-extinguishing gas into engine room, Tui oil and gas field, 27 May 2010 (https://taic.org.nz/sites/default/files/inquiry/documents/10-203%20Final%20Published.pdf). 11 Report on the investigation of the accidental discharge of carbon dioxide on board SD Nimble, resulting in serious injury to a shore-based service engineer at Her Majesty’s Naval Base Faslane 23 August 2011 (https://www.gov.uk/maib-reports/accidental-discharge-of-carbon-dioxide-when-testing-the-fixed-co2-fire- extinguishing-system-on-tug-sd-nimble-at-hm-naval-base-faslane-scotland-with-1-person-injured).
27 Sister vessel 2 of Eddystone In January 2013, while the chief engineer was putting the CO2 system back into service at the end of the dry docking period, CO2 discharged from 14 cylinders whose safety pins had already been removed. The engine room distribution valve, which was locked shut, prevented the release of CO2 into the engine room. The cause of leakage was subsequently determined to be leakage from a Schmöle cylinder valve. 4.3.3 Cases from Mariners’ Alerting and Reporting Scheme The Mariners’ Alerting and Reporting Scheme (MARS) was a confidential reporting system run by The Nautical Institute to allow full reporting of accidents and near misses on board vessels, without fear of identification or litigation. Anonymous MARS reports based on these accidents and incidents were held in a publicly- accessible database as a free service to the industry. MARS 201311 reported on an inadvertent release of CO2 from 11 cylinders into the manifold, which subsequently leaked into the CO2 room of a vessel. The subsequent investigation established that a cylinder valve set screw had not been tightened to the correct torque, resulting in the valve opening when the ambient temperature in the CO2 room reached 50°C. MARS 201120, reported the failure of a CO2 extinguishing system to release during an engine room fire. This was found to have been due to several deficiencies in the maintenance of the system. These included leaking connections, failed distribution valves, failure of pilot cylinders to release, and water accumulation and corrosion inside the pipelines. The system had been inspected and serviced by an authorised service supplier shortly before the incident. 4.3.4 United States Coast Guard reports In July 2017, the USCG published Safety Alert 07-17, titled CO2 Hazards are Nothing New. But we’d like to remind you of what not to do! The alert reported a near fatal accident due to the unintentional release of CO2 while coastguard officers were inspecting a vessel. Technicians working on the system were responsible for releasing the CO2. 4.3.5 Research on CO2 related accidents In a paper12 exploring the risks of CO2 as a fire-suppressant, 146 deaths were found to be associated with the use of CO2 in the period 1940 to 1998. The data excluded deaths caused by fires, and concluded: These deaths point to a need for additional safety measures when using CO2. A large proportion (68%) of the post-1975 incidents was marine-related. Examination of the causes of the incidents indicated that only a limited number of crewmembers had the training and authority to activate the systems. Those crewmembers without training may not have had a true appreciation of the dangers that surround exposure to high CO2. Consequently, additional safety measures might be warranted for marine applications. 12 S.R. Skaggs at Halon Options Technical Working Conference (May 1998): Examining the risks of CO2 as a fire suppressant.
28 This data was further corroborated in a separate study13 by the US Environmental Protection Agency (EPA), which concluded: Examination of the accident records shows that a disproportionately large number of accidents involving carbon dioxide have occurred on marine vessels. And: Maritime regulations (46 CFR Part 76.1514 and SOLAS) do not provide detailed requirements to ensure safety of personnel. These maritime regulations can be contrasted with the NFPA15 standard that has more specific suggestions to protect personnel against the adverse effect of carbon dioxide. The report went on to recommend: Improvement of maritime regulations would at least provide specific requirements that would presumably help reduce the accidental exposures that occur in marine applications. The UK’s Health & Safety Executive (HSE) draws upon the data from the US EPA study in a major paper16 and states: From 1975 to 2000, a total of 51 incident records were located that reported a total of 72 deaths and 145 injuries resulting from accidents involving the discharge of CO2 from fire extinguishing systems. The review indicates that the majority of reported incidents occurred during maintenance on or around the CO2 fire protection system itself. 13 U.S. Environmental Protection Agency, February 2000: Carbon Dioxide as a Fire Suppressant: Examining the Risks. 14 U.S. domestic regulation. 15 The National Fire Protection Association (NFPA) is a U.S. trade association. 16 Peter Harper HSE: Assessment of the major hazard potential of carbon dioxide (CO2).
29 SECTION 5 - ANALYSIS 5.1 AIM The purpose of the analysis is to determine the contributory causes and circumstances of the accident as a basis for making recommendations to prevent similar accidents occurring in the future. 5.2 OVERVIEW The concentration of CO2 required to be released into a space to extinguish a fire is more than double that required to kill a human being within a minute. Therefore, any accidental release of CO2 can, and often does, have fatal consequences. Ashore, the use of CO2 is discouraged in spaces where people may be present. The data collated by the EPA on fatal accidents and injuries from 1975 to 2000 most likely influenced this move against the use of CO2. Several safer alternatives have been developed, and the move away from using CO2 as an extinguishing agent has improved the safety of land-based systems. The marine industry’s reluctance to adopt a similar approach is likely to cost more lives in the future. The two incidents investigated for this report were both caused by leakage of CO2 through cylinder valves. Unlike the Marsol Pride incident, in both of these cases the distribution valves held, protecting ship’s staff from exposure to CO2, reducing the potential for injury or loss of life. It is likely that in both cases the leakage of the cylinder valves, and the failure of the alarms designed to warn of such leakage, was attributable to the work of approved service suppliers operating within the ambiguous and limited international requirements regarding these systems and their maintenance. 5.3 MECHANISM OF CO2 RELEASE 5.3.1 Eddystone Immediately after the incident on board Eddystone, the chief engineer observed that all 65 cylinder valves in bank A had opened, and that the manual and remote releases remained undisturbed. In order for this to have occurred, one or more cylinder valves must have leaked, pressurising the manifold. This led to the pressurisation of the trigger line, through the non-return valve that was subsequently found to be leaking, and the discharge of all the cylinders in bank A. It was not possible to identify which cylinder valve had initiated the discharge, and there were no available records for the torque settings of the Schmöle valve set screws for either bank of cylinders from before or after the incident. The design of Schmöle valves was such that if their set screws were inadequately torqued, the likelihood of the valve leaking would rise significantly with increased cylinder pressure. At the time of the unintended release, Eddystone had just entered the Southern Red Sea, and the ambient temperature of the CO2 room had risen above CO2’s critical temperature. The fill density of the cylinders was not recorded but, in any event, given the minimum permissible fill density, this temperature rise would have caused the pressure within the CO2 cylinders to rise rapidly to over 76
30 bar at 32°C (Figure 1). Therefore, it is considered almost certain that the leakage on Eddystone was the result of one or more incorrectly torqued Schmöle valve set screws. There is a history of similar incidents involving Schmöle type cylinder valves leaking as a result of incorrect torques having been applied to their set screws at installation or service. These include the MARS 201311 report and the two incidents on Eddystone’s sister vessels, where one was found to have had almost all of its Schmöle valve set screws incorrectly torqued. 5.3.2 Red Eagle Following the incident on Red Eagle, it was established that all but the two master cylinders had been released, despite the manual and remote releases remaining undisturbed. Red Eagle’s fixed fire-extinguishing system was designed such that pressurisation of the manifold, normally from the master cylinders, would lead to the release of all the remaining cylinders through a direct connection between the manifold to the trigger line (Figure 10). The unintended release was caused by one, or more, of the cylinders (other than a master cylinder) leaking into the manifold until the activation pressure was reached in the trigger line, when the remaining cylinders started being activated. Both master cylinders remained undischarged because their trigger lines were not connected to the main manifold. During tests carried out at DAB’s facilities it was established that the actuators would start opening cylinder valves at a trigger pressure of 4.14 bar. Cylinder valves 97056 and 37017 were also identified to be leaking during these tests. However, the leakage from valve 37017 was considered to have resulted from the incident. The localised frosting of the union between the check valve and the cylinder outlet hose visible in Figure 8, taken immediately after the incident, was a result of cooling caused by the rapid expansion of CO2 as it escaped. This indicated that this was a likely source of leakage from the system following the unintended release. Therefore, assuming the check valves were in good working order and that the manifold was completely gas tight at low pressure, it is possible that the slow leak found in valve 97056 led to a gradual build-up of pressure. However, this would have taken several weeks to reach the 4.14 bar needed to trigger the discharge. It is also possible that the valve that leaked, causing the system to discharge, had subsequently re-seated and held pressure during tests conducted at DAB. 5.4 CYLINDER VALVE LEAKAGE 5.4.1 Eddystone Schmöle valves, such as those fitted on board Eddystone, were designed to operate 100 times before they needed to be replaced, and they could not be refurbished. However, it was critical that the correct torque was applied to their set screws at installation, and checked during the annual inspection and maintenance. In the absence of any record of the set screw torques having been set or checked, it is likely that this was not done during the system’s last inspection 8 months before the incident. The setting and checking of the set screws’ torque are specific to Schmöle valves, so do not appear in any of the general guidance or requirements for annual inspection and maintenance. It should, however, form part of the vessel-specific worklist developed by the service supplier.
31 5.4.2 Red Eagle The CO2 cylinders fitted on Red Eagle were equipped with DAB valves. There was no written guidance concerning the service life of these valves, although after the incident DAB stated that they should be replaced every 10 years. The valves were designed to be serviced, but the manufacturer’s maintenance instructions stated that they were not to be refurbished by the end-user, except in an emergency. The leaking valve that led to the unintended release of CO2 on board Red Eagle could not be identified with certainty. Therefore, the specific cause of the leakage cannot be known. However, the valves showed evidence of refurbishment by service suppliers, including the use of a wire wheel or similar to clean the internal components. This is contrary to the manufacturer’s instructions and led to the entrapment of brass particles on the sealing surface of one valve, causing it to leak. 5.4.3 Maintenance Given the potentially fatal consequences of unintentional discharge of CO2 from fixed fire-extinguishing systems, the current ‘fit and forget’ approach to cylinder valves is unsafe. Regular inspection and maintenance in line with the manufacturer’s instructions is of paramount importance in ensuring the safety of these systems. 5.5 USE OF SHIP’S SERVICE AIR Ship’s service air is typically taken directly from the air receiver and, as a result, contains both moisture and oil. Unlike control air, service air is not dried or filtered. Therefore, applying service air to CO2 systems introduces moisture, leading not only to internal corrosion of pipework and fittings, but also to the risk of blockages caused by internal icing when CO2 is released. It is for these reasons that MSC.1/Circ.1318 requires the use of nitrogen or dry air. The annual inspection and maintenance of Eddystone’s CO2 system was carried out in October 2015. When the system was being reinstated following the incident in July 2016, eight check valves and one non-return valve were found to be leaking. It is likely that the practice of using ship’s service air contributed to the premature failure of these fittings. 5.6 PROTECTION SYSTEMS 5.6.1 Vent valves Fixed fire-extinguishing system designers were aware of the potential for cylinder valves to leak during their service life. To mitigate the risk of unintentional system discharge posed by such leakage, many systems were fitted with vent valves. These were designed to prevent pressure build-up by venting CO2 leakage to atmosphere, typically up to a pressure of about 1.5 bar. To ensure normal operation when activated, these valves would close when the system was subjected to operational pressure. However, vent valves were not mandatory for CO2 fixed fire-extinguishing systems. Eddystone’s system was fitted with vent valves in its pilot lines. However, the leakage occurred into the manifold and the trigger line, and did not affect the pilot lines.
32 5.6.2 Leakage alarms The leakage alarms fitted to both vessels activated only once the cylinders released CO2 into the manifolds. The alarm set points were outside the range of the respective pressure switches, and it was fortunate that they triggered the alarm. Had the distribution valves been open (or failed as a result of the shock loading), allowing CO2 to release into the engine rooms, it is possible that no alarm would have sounded since the manifold pressure would have been significantly lower. Leakage alarms were not required by national or international regulations. Therefore, they were not mentioned in the Example Service Chart for high pressure CO2 systems included in MSC.1/Circ.1318 (Annex B) as it only included checks on components required by the FSS Code. As a result, their purpose and function were not understood by the service suppliers or surveyors involved, and they had been subjected to inappropriate tests. RESMAR technicians recognised that the 7 bar pressure available from the ship’s service air on Eddystone was insufficient to trigger the alarm. Had they understood the purpose of the alarm, it would have been clear that it should have been set to trigger at the lowest pressure possible. The pressure switch for the alarm fitted to Red Eagle was found to have been adjusted to trigger at 0 bar as it was probably damaged by the application of compressed air at a pressure above its maximum rated pressure. It is likely that at some time in the past, the setting of the pressure switch was adjusted until the alarm was triggered during annual pressure testing of the manifold. Without reference to the system drawing, the range, set point and purpose of the alarm were misunderstood. This was further demonstrated by the fitting of a switch with a range of 10-370 bar when re-instating the system following the CO2 release. That this switch was accepted by the MCA surveyor and Johnson Controls International demonstrates the need for improved guidance on the maintenance and operation of these systems. This is especially true in the case of legacy systems, when the rationale behind the design features of the original system becomes lost or is misunderstood following a change of company ownership. 5.7 AMBIGUITY OF GUIDANCE 5.7.1 Hydrostatic testing of high pressure cylinders MSC.1/Circ.1318 section 6 provides recommended minimum maintenance for fixed CO2 fire-extinguishing systems. With respect to hydrostatic testing, sub-section 6.1.2 initially states that the hydrostatic test date of all storage containers should be checked. It is not immediately clear what the purpose of checking the dates is, although the text that immediately follows it: High pressure cylinders should be subjected to periodical tests at intervals not exceeding 10 years, could imply that hydrostatic testing should not exceed a 10-year periodicity. However, the subsequent sentence, further reinforced by point 19 of Example Service Charts in the Appendix, states that at the 10-year inspection, at least 10% of the total number provided should be subjected to an internal inspection and hydrostatic test. This can result in the interpretation that the same 10% of cylinders may be hydrostatically tested every 10 years, with the result that 90% of a vessel’s cylinders could remain untested throughout its service life.
33 Many administrations have chosen to interpret the above requirement for testing periodicity as meaning that only 10% of cylinders need to be hydrostatically tested every 10 years. In the UK, this interpretation is negated by the MCA’s guidance to surveyors that stipulates that all CO2 cylinders should be tested within 20 years. In this context, it is noteworthy that the maintenance requirements for land-based systems make it mandatory that all CO2 cylinders be hydrostatically tested within a 10-year period (12 years in the USA). The divergence in approach between land and marine organisations to the safety of CO2 systems is hard to reconcile, especially as a malfunctioning CO2 installation on an ocean-going vessel has the potential to leave the vessel without a fixed fire-extinguishing system until it arrives at a port where the system can be reinstated. Given that the marine industry, unlike shore-based industries, is not making the transition to safer alternatives to CO2, there is an urgent need for the International Maritime Organization (IMO) to clarify MSC.1/Circ.1318 section 6 to remove any ambiguity about the requirements for hydrostatic testing of high pressure cylinders. 5.7.2 Cylinder valve testing, inspection and maintenance MSC.1/Circ.1318 provides no guidance on the testing and maintenance of cylinder valves, beyond recommending an annual visual inspection and stating that any maintenance should be carried out according to the system manufacturer’s instructions. It does refer, however, in a footnote, to ISO 6406, which in turn refers to EN 14189 (now superseded by BS EN ISO 22434:2011). ISO 6406 provides some guidance on valve maintenance, recommending general cleaning, together with replacement of elastomers and worn or damaged components, without specifying the need to refer to manufacturer’s instructions. BS EN ISO 22434:2011 permits valves to be re-used without maintenance if an external inspection reveals no defects or anomalies. In practice, due to the ambiguity in MSC.1/Circ.1318 outlined in 5.7.1 above, the only test carried out on cylinder valves is a leak test when the cylinders are refilled following hydrostatic testing. It is therefore possible for 90% of a vessel’s CO2 cylinder valves to remain untested for the life of the vessel. Since it is not possible to establish by visual inspection that the set screw on a Schmöle type valve is correctly torqued, 90% of these could also remain incorrectly set for the life of a vessel, or until they leak. In the incident involving Red Eagle, it is possible that CO2 leaked through a seal contaminated with brass particles that had resulted from the service supplier using a wire wheel or similar while refurbishing the DAB valve. This refurbishment was not in accordance with manufacturer’s instructions (see 5.4.2), but was likely a consequence of the service supplier believing DAB was no longer trading. Finally, FIA guidance (see 4.2.4) recommends that cylinder valves with tapered threads, the most common types used in the marine industry, are replaced when removed after a single construction due to likelihood that the brass thread will have distorted upon tightening into a steel cylinder. This guidance is not replicated in MSC.1/Circ.1318.
34 From the above, it can be concluded that ambiguity exists over the appropriate servicing standards to be applied to cylinder valves, and that the generic guidance available to the industry varies in quality. The ambiguity is further compounded by the uncertain requirements for hydrostatic testing of CO2 cylinders as described in the previous section. 5.7.3 Summary Given the hazard that CO2 poses to human health, there is a need for the IMO to clarify MSC.1/Circ.1318 section 6 to remove any ambiguity about the requirements for hydrostatic testing of high pressure cylinders. [5.7.1] It can be concluded that ambiguity exists over the appropriate servicing standards to be applied to cylinder valves, and that the generic guidance available to the industry varies in quality. [5.7.2] 5.8 SERVICE SUPPLIERS CO2 based fixed fire-extinguishing systems are entirely reliant on the ability of ships’ staff to release the required quantity of CO2 into the appropriate space in the event of an emergency. Flag administrations, classification societies, ships’ owners, operators and crew all rely on approved service suppliers to ensure that these systems are in a continuous state of readiness, by means of regular maintenance and testing. Service suppliers are often called upon to attend unfamiliar vessels when they call into port. It is accepted that working on an unfamiliar system within the constraints of a vessel’s busy schedule in port could be challenging. However, both Eddystone and Red Eagle were vessels known to their respective service supplier. The investigations into the incidents described in this report found significant deficiencies in the inspection and maintenance provided by service suppliers. These included: ● ●Refurbishing of cylinder valves contrary to the manufacturer’s guidance. ● ●Not maintaining records when cylinder valves were refurbished. ● ●Blowing through or pressurising Eddystone's system with ship’s service air instead of dry air or nitrogen. ● ●Working on systems without adequate documentation such as system drawings. ● ●Fitting an inappropriate pressure switch. ● ●Setting pressure switches outside their operating range. ● ●Not testing pressure switches. ● ●Not maintaining control and oversight over subcontracted third parties.
35 Many past incidents have occurred during maintenance, and as a result of poor maintenance of system components. The incidents on SD Nimble and sister vessel 1 of Eddystone; the cases reported in MARS 201311; and the USCG report citing several serious deficiencies observed immediately after a system service, demonstrate that such deficiencies are widespread. This is further supported by the findings of the UK HSE and the US EPA. The Procedural Requirements for Service Suppliers, UR Z17 (Annex D), describes requirements placed by the classification societies on those approved to maintain safety systems and equipment. However, it is apparent from the findings of this report, that the level of service given by some approved service suppliers regularly fails to maintain the safety of CO2 based fixed fire-extinguishing systems on board ships.
36 SECTION 6 - CONCLUSIONS 6.1 SAFETY ISSUES DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS
It is almost certain that the CO2 fire-extinguishing system on Eddystone discharged because of one or more incorrectly torqued Schmöle cylinder valve set screws. [5.3.1] 2. The unintended release of CO2 on Red Eagle was caused by one or more cylinder valves leaking into the manifold, causing the system to discharge. [5.3.2] 3. Red Eagle’s fixed fire-extinguishing system was designed such that pressurisation of the manifold would lead to the release of all the remaining cylinders. [5.3.2] 4. It is likely that the torque on Eddystone’s Schmöle valve set screws had not been checked during the system’s last inspection 8 months earlier. [5.4.1] 5. Red Eagle’s cylinder valves showed evidence of refurbishment by service suppliers, which led to the entrapment of brass particles on the sealing surface of one valve, causing it to leak. [5.4.2] 6. Regular inspection and maintenance of CO2 cylinder valves in line with the manufacturer’s instructions is of paramount importance in ensuring the safety of these systems. [5.4.3] 7. The practice of using ships’ service air to blow through CO2 systems is likely to have contributed to the premature failure of fittings on these systems. [5.5] 8. The purpose and function of leakage alarm switches was not understood by the service suppliers or surveyors involved, resulting in them being incorrectly set and subjected to inappropriate tests. [5.6.2] 9. Given the hazard that CO2 poses to human health, there is a need for the IMO to clarify MSC.1/Circ.1318 section 6 to remove any ambiguity about the requirements for hydrostatic testing of high pressure cylinders. [5.7] 10. It can be concluded that ambiguity exists over the appropriate servicing standards to be applied to cylinder valves, and that the generic guidance available to the industry varies in quality. [5.7.2]
Flag administrations, classification societies, ship’s owners, operators and crew all rely on approved service suppliers to ensure that CO2 fixed fire-extinguishing systems are in a continuous state of readiness, by means of regular maintenance and testing. [5.8] 12. The level of service given by approved service suppliers regularly fails to maintain the safety of CO2 based fixed fire-extinguishing systems on board ships. [5.8]
37 SECTION 7 - ACTION TAKEN 7.1 ACTIONS TAKEN BY OTHER ORGANISATIONS The Maritime and Coastguard Agency has: Issued a safety bulletin to the operators of all UK registered vessels clarifying the ambiguity of MSC.1/Circ.1318 regarding the hydrostatic testing periodicity for CO2 cylinders and the appropriate maintenance of CO2 fixed fire-extinguishing systems and their components (Annex E). Red Funnel has: Replaced the CO2 cylinder valves on all the Raptor class vessels in its fleet. AW Ship Management Limited has: Replaced the non-return and check valves on all the sister vessels of Eddystone.
38 SECTION 8 - RECOMMENDATIONS The Maritime and Coastguard Agency is recommended to: 2018/123 Ensure that surveys check that all safety devices fitted to CO2 fixed fire- extinguishing systems are appropriately maintained and surveyed. 2018/124 Seek clarification from the IMO of the maximum permitted periodicity between hydrostatic tests of individual high pressure cylinders, as detailed in MSC.1/ Circ.1318 ANNEX B 6.1.2. Det Norske Veritas – Germanischer Lloyd and Lloyd’s Register are recommended to: 2018/125 Propose to the International Association of Classification Societies that an investigation be carried out into the application of Procedural Requirements for Service Suppliers, UR Z17. This should take into consideration the finding of this report, that the level of service provided by approved service suppliers regularly fails to maintain the safety of CO2 based fixed fire-extinguishing systems on ships. Red Funnel is recommended to: 2018/126 Review the design of the CO2 fixed fire-extinguishing systems fitted to its vessels where the leakage of a single cylinder valve causes the entire system to discharge. Safety recommendations shall in no case create a presumption of blame or liability
Marine Accident Report
FD06058 | 2018_英国_unintentional-release-of-carbon-dioxide-from-fixed-fire-extinguishing-systems-on-ro-ro-vessels-eddystone-and-red-eagle_2018-16-_Eddystone_and_Red_Eagle_Annexes.pdf.pdf
分类:06_境外及港澳台调查报告 | 年份:2018 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
Annex A DAB Inspection Report — Red Eagle — 31st July 2017
Inspection Report – Red Eagle – 31st July 2017 Background DAB Fire Engineering Ltd were originally contacted on Tuesday the 18th of July by of the Maritime and Coastguard Agency and informed of an accidental CO2 discharge aboard the Red Eagle Passenger ferry. The CO2 system was fitted with DAB CO2 Cylinder Valves (D10963/D) and DAB Manual Pneumatic Actuators (D10964/B). It should be noted that DAB Fire Engineering Ltd is not the original supplier of the valves and actuators - These were previously supplied by DAB Engineering Company Limited - but as the new manufacturer of DAB products we agreed to help with the incident. DAB Fire were subsequently contacted by of the Marine Accident Investigation Branch and asked if we could help with the inspection and testing of the valves. 26 valves were sent to DAB for inspection and all inspection and testing was witnessed by . Initial Inspection All valves were unpacked and the serial numbers logged as below. A quick visual inspection showed that there were 4 separate dates of valves. The serial numbers of the oldest valves (37000 range) were commensurate with the age of the vessel. (1996) The 39938 valve would be approximately circa 1997/8. These valves are before the date of the electronic records so were unable to date the valves exactly. The valve marked 73719 was new enough to be included in our serial number log and showed as being supplied to Tyco Engineering Services on 04th September 2000. The valves marked 97050, 97056, 97057, 97054 and 97059 were part of a batch supplied to Tyco Marine Services on 2nd November 2004. Externally all valves looked to be in good condition considering their age, with the exception of valve no 97056 which showed discolouration and evidence of rust inside the outlet port. Leak Testing All valves were subjected to a standard seat leakage test which consists of pressurising the valve to 40 Bar through the syphon tube thread and applying a soapy solution to the outlet port to produce a film. Any leakage would be demonstrated by a bubble forming and bursting. All valves passed the leakage test except for valves no 37017 and 97056. Valve 37017 had a reasonably major leakage and was retested with a flow meter on the outlet to try and measure the leak rate. The leak was over the range of our meter and far in excess of 5 litres per minute. Valve 97056 had a very minor leak that was far below the range of our flow meter. The bubble forming on the outlet took approx 20 seconds to burst.
Internal inspection. The leaking valves were disassembled and inspected internally. Valve 37017 Valve 37017 looked to be in reasonable condition internally, but it was noted that the restrictor wire had dislodged from the servo piston and had been caught between the main seat and the pilot check. This would’ve caused the leak. Despite the leak, it was determined that this leak was not the cause of the system activation as the leak would’ve been obvious when the cylinder was filled and the broken wire had most likely been sitting on top of the main seat for some time and lodged between the pilot check and the seat when the system was activated. Valve 97056 When valve 97056 was disassembled, it was noted that the outlet side of the valve was heavily discoloured internally and rust had formed in the outlet. As the valve is manufactured from brass and stainless steel it was surmised that the rust had come from the discharge hose fitting which are normally manufactured from zinc plated steel.
Upon further inspection, it was also noted that the bonnet assembly showed signs of pitting associated with being cleaned with a wire wheel, or similar. The valve had obviously been disassembled previously during its service life.
The main seat was inspected using an eye loupe and small flecks of brass swarf were visible in the main seating area. From experience, this brass swarf was the most likely cause of the leak. The leak however, was so slight that it would have taken many months if not longer for the leak to build up pressure inside the manifold and discharge the system.
Activation pressure test. A new CO2 valve was fitted to our test rig and a pressure of 50 Bar applied to the inlet. A standard D10964 Manual / Pneumatic actuator was fitted to the valve, and pressure increased to the activation port until the valve began to fire. At approximately 60PSI the valve Pilot seat began to open slightly.
Conclusion Without gaining access to the rest of the CO2 suppression system it is difficult to conclude if the leaking valves were the cause of the accidental initiation of the system. If the complete manifold and pilot system aboard the Red Eagle was 100% sealed then it would be possible for the very minor leak in valve no 97056 to slowly build up over time and provide enough pressure to slowly activate the rest of the system. Once a pressure of 60 PSI is achieved in the manifold the first of the valves would start to open causing a cascade effect in the rest of the system opening the remaining 25 valves. My recommendation would be for a bleed valve to be fitted to the pilot system to prevent accidental build up of pressure in the future. DAB has always unofficially suggested a life expectancy of 10 years for all of its products, though the life span may be extended if the products are well maintained. It was also noted that the system also contained a DAB Pressure Operated Direction valve on the end of the manifold. If this valve is of the same age as the rest of the system it should also be replaced as it is past its service life and is not up to current testing regulations.
DAB Fire Engineering Ltd. 16th August 2017
Annex ‘A’ CO2 Bottle Valve Serial No Comments 1 37017 No Leak 2 37039 No Leak 3 37012 No Leak 4 37009 No Leak 5 37032 No Leak 6 37049 No Leak 7 37001 Major leak on outlet in excess of 5 litres per minute 8 39938 No Leak 9 37037 No Leak 10 37020 No Leak 11 37045 No Leak 12 37052 No Leak 13 37033 No Leak 14 37034 No Leak 15 37042 No Leak 16 97050 No Leak 17 97056 Very minor leak on outlet. 18 97057 No Leak 19 97054 No Leak 20 73719 No Leak 21 97059 No Leak 22 37031 No Leak 23 37048 No Leak 24 37038 No Leak 25 37053 No Leak 26 37028 No Leak
Annex B IMO Circular - MSC.1/Circ.1318
INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR E Telephone: 020 7735 7611 Fax: 020 7587 3210 IMO Ref: T4/4.01 MSC.1/Circ.1318 11 June 2009 GUIDELINES FOR THE MAINTENANCE AND INSPECTIONS OF FIXED CARBON DIOXIDE FIRE-EXTINGUISHING SYSTEMS 1 The Committee, at its eighty-sixth session (27 May to 5 June 2009), having considered the proposal by the Sub-Committee on Fire Protection, at its fifty-third session, approved Guidelines for the maintenance and inspections of fixed carbon dioxide fire-extinguishing systems, as set out in the annex. 2 Member Governments are invited to apply the annexed Guidelines when inspecting fixed carbon dioxide fire-extinguishing systems on board all ships and bring them to the attention of ship designers, shipowners, equipment manufacturers, and other parties concerned.
I:\CIRC\MSC\01\1318.doc
MSC.1/Circ.1318 ANNEX GUIDELINES FOR THE MAINTENANCE AND INSPECTIONS OF FIXED CARBON DIOXIDE FIRE-EXTINGUISHING SYSTEMS 1 General These Guidelines provide the minimum recommended level of maintenance and inspections for fixed carbon dioxide fire-extinguishing systems on all ships, and are intended to demonstrate that the system is kept in good working order as specified in SOLAS regulation II-2/14.2.1.2. These Guidelines are intended to supplement the fire-extinguishing system manufacturer’s approved maintenance instructions. Certain maintenance procedures and inspections may be performed by competent crewmembers, while others should be performed by persons specially trained in the maintenance of such systems. The onboard maintenance plan should indicate which parts of the recommended inspections and maintenance should be completed by trained personnel. 2 Safety Whenever carbon dioxide fire-extinguishing systems are subjected to inspection or maintenance, strict safety precautions should be followed to prevent the possibility that individuals performing or witnessing the activities are placed at risk. Prior to performing any work, a safety plan should be developed to account for all personnel and establish an effective communications system between the inspection personnel and the on-duty crew. Measures to avoid accidental discharges such as locking or removing the operating arms from directional valves, or shutting and locking the system block valve should be taken as the initial procedure for the protection of personnel performing any maintenance or inspections. All personnel should be notified of the impending activities before work is begun. 3 Maintenance and inspection plan Fixed carbon dioxide fire-extinguishing systems should be kept in good working order and readily available for immediate use. Maintenance and inspections should be carried out in accordance with the ship’s maintenance plan having due regard to ensuring the reliability of the system. The onboard maintenance plan should be included in the ship’s safety management system and should be based on the system manufacturer’s recommendations including: .1 maintenance and inspection procedures and instructions; .2 required schedules for periodic maintenance and inspections; .3 listing of recommended spare parts; and .4 records of inspections and maintenance, including corrective actions taken to maintain the system in operable condition. I:\CIRC\MSC\01\1318.doc
- 2
In addition, on low pressure systems the inspections should verify that:
MSC.1/Circ.1318 ANNEX Page 2 4 Monthly inspections 4.1 At least every 30 days a general visual inspection should be made of the overall system condition for obvious signs of damage, and should include verification that: .1 all stop valves are in the closed position; .2 all releasing controls are in the proper position and readily accessible for immediate use; .3 all discharge piping and pneumatic tubing is intact and has not been damaged; .4 all high pressure cylinders are in place and properly secured; and .5 the alarm devices are in place and do not appear damaged. .1 the pressure gauge is reading in the normal range; .2 the liquid level indicator is reading within the proper level; .3 the manually operated storage tank main service valve is secured in the open position; and .4 the vapour supply line valve is secured in the open position. 5 Annual
inspections The following minimum level of maintenance and inspections should be carried out in accordance with the system manufacturer’s instructions and safety precautions: .1 the boundaries of the protected space should be visually inspected to confirm that no modifications have been made to the enclosure that have created uncloseable openings that would render the system ineffective; .2 all storage containers should be visually inspected for any signs of damage, rust or loose mounting hardware. Cylinders that are leaking, corroded, dented or bulging should be hydrostatically retested or replaced; .3 system piping should be visually inspected to check for damage, loose supports and corrosion. Nozzles should be inspected to ensure they have not been obstructed by the storage of spare parts or a new installation of structure or machinery; .4 the manifold should be inspected to verify that all flexible discharge hoses and fittings are properly tightened; and I:\CIRC\MSC\01\1318.doc
MSC.1/Circ.1318 ANNEX Page 3 .5 all entrance doors to the protected space should close properly and should have warning signs, which indicate that the space is protected by a fixed carbon dioxide system and that personnel should evacuate immediately if the alarms sound. All remote releasing controls should be checked for clear operating instructions and indication as to the space served. 6 Minimum
recommended maintenance 6.1 At least biennially (intervals of 2 years ± 3 months) in passenger ships or at each intermediate, periodical or renewal survey* in cargo ships, the following maintenance should be carried out (to assist in carrying out the recommended maintenance, examples of service charts are set out in the appendix): .1 all high pressure cylinders and pilot cylinders should be weighed or have their contents verified by other reliable means to confirm that the available charge in each is above 90% of the nominal charge. Cylinders containing less than 90% of the nominal charge should be refilled. The liquid level of low pressure storage tanks should be checked to verify that the required amount of carbon dioxide to protect the largest hazard is available; .2 the hydrostatic test date of all storage containers should be checked. High pressure cylinders should be subjected to periodical tests at intervals not exceeding 10 years. At the 10-year inspection, at least 10% of the total number provided should be subjected to an internal inspection and hydrostatic test*. If one or more cylinders fail, a total of 50% of the onboard cylinders should be tested. If further cylinders fail, all cylinders should be tested. Flexible hoses should be replaced at the intervals recommended by the manufacturer and not exceeding every 10 years; and .3 the discharge piping and nozzles should be tested to verify that they are not blocked. The test should be performed by isolating the discharge piping from the system and flowing dry air or nitrogen from test cylinders or suitable means through the piping. 6.2 At least biennially (intervals of 2 years ± 3 months) in passenger ships or at each renewal survey in cargo ships, the following maintenance should be carried out by service technicians/specialists trained to standards accepted by the Administration: .1 where possible, all activating heads should be removed from the cylinder valves and tested for correct functioning by applying full working pressure through the pilot lines. In cases where this is not possible, pilot lines should be disconnected from the cylinder valves and blanked off or connected together and tested with full working pressure from the release station and checked for leakage. In both cases this should be carried out from one or more release stations when installed. * Refer to Survey guidelines under the Harmonized System of Survey and Certification, 2007 (resolution A.997(25)). ** Refer to standard ISO 6406 – Periodic inspection and testing of seamless steel gas cylinders. I:\CIRC\MSC\01\1318.doc
MSC.1/Circ.1318 ANNEX Page 4 If manual pull cables operate the remote release controls, they should be checked to verify the cables and corner pulleys are in good condition and freely move and do not require an excessive amount of travel to activate the system; .2 all cable components should be cleaned and adjusted as necessary, and the cable connectors should be properly tightened. If the remote release controls are operated by pneumatic pressure, the tubing should be checked for leakage, and the proper charge of the remote releasing station pilot gas cylinders should be verified. All controls and warning devices should function normally, and the time delay, if fitted should prevent the discharge of gas for the required time period; and .3 after completion of the work, the system should be returned to service. All releasing controls should be verified in the proper position and connected to the correct control valves. All pressure switch interlocks should be reset and returned to service. All stop valves should be in the closed position. I:\CIRC\MSC\01\1318.doc
MSC.1/Circ.1318 ANNEX Page 5 APPENDIX EXAMPLE SERVICE CHARTS HIGH PRESSURE CO2 SYSTEM Date: Name of ship/unit: IMO No.: Technical description No. Text Value 1 Manufacturer 2 Number of main cylinders 3 Main cylinders capacity (each) 4 Number of pilot cylinders 5 Pilot cylinder capacity (each) 6 Number of distribution lines 7 Oldest cylinder pressure test date 8 Protected space(s) 9 Date flexible hoses fitted/renewed Description of inspection/Tests No. Description Carried out Not carried out Not applicable Comment 1 Release controls and distribution valves secured to prevent accidental discharge 2 Contents in main cylinders checked by weighing 3 Contents in main cylinders checked by liquid level indicator 4 Contents of pilot cylinders checked 5 All cylinder valves visually inspected 6 All cylinder clamps and connections checked for tightness 7 Manifold visually inspected 8 Manifold tested for leakage, by applying dry working air 9 Main valve and distribution valves visually inspected 10 Main valve and distribution valves tested for operation 11 Time delay devices tested for correct setting* 12 Remote release system visually inspected 13 Remote release system tested 14 Servo tubing/pilot lines pressure tested at maximum working pressure and checked for leakages and blockage 15 Manual pull cables, pulleys, gang releases tested, serviced and tightened/adjusted as necessary 16 Release stations visually inspected 17 Warning alarms (audible/visual) tested 18 Fan stop tested* 19 10% of cylinders and pilot cylinder/s pressure tested every 10 years 20 Distribution lines and nozzles blown through, by applying dry working air 21 All doors, hinges and locks inspected* 22 All instruction and warning signs on installation inspected 23 All flexible hoses renewed and check valves in manifold visually inspected every 10 years 24 Release controls and distribution valves reconnected and system put back in service 25 Inspection date tags attached * If fitted as part of the CO2 system. I:\CIRC\MSC\01\1318.doc
MSC.1/Circ.1318 ANNEX Page 6 LOW PRESSURE CO2 SYSTEM Date: Name of ship/unit: IMO No.: Technical description No. Text Value 1 Manufacturer 2 No. of tanks 3 Tanks capacity (tonnes) 4 Number of pilot cylinders 5 Pilot cylinder capacity (each) 6 Number of distribution lines 7 Protected space(s) Description of inspection/Tests No. Description Carried out Not carried out Not applicable Comment 1 Tank main service valve closed and secured to prevent accidental discharge 2 Distribution valves verified closed 3 Check correct function of level indicator 4 Contents of CO2 tank checked by tank level indicator 5 Contents of CO2 tank checked by riser tube reading 6 Contents of CO2 tank checked by level control valve 7 Supports of tank inspected 8 Insulation on tank inspected 9 Safety valves of tank inspected 10 Safety valves of tank tested 11 Contents of pilot cylinders checked 12 Start/stop function of cooling compressors tested 13 All connected electrical alarms and indicators tested 14 Main manifold valve inspected 15 Main manifold valve tested 16 Distribution valves inspected 17 Distribution valves tested 18 Release stations inspected 19 Total flooding release mechanism inspected 20 Total flooding release mechanism tested 21 Time delay devices tested for correct setting* 22 Warning alarms tested 23 Fan stop tested* 24 Distribution lines and nozzles inspected 25 Distribution lines and nozzles tested 26 Distribution lines and nozzles blown through 27 All doors, hinges and locks inspected* 28 All instruction plates inspected 29 Tank main service valve reopened and secured open 30 System put back in service 31 Inspection date tags attached * If fitted as part of the CO2 system. I:\CIRC\MSC\01\1318.doc
Annex C Fire Industry Association guidance note
Guidance Note Guidance on the Periodic Testing of Transportable Gas Containers used in Fire Extinguishing Systems
Guidance on the Periodic Testing of Transportable Gas Containers • Version 2 • November 2015 • Tel: +44 (0)20 3166 5002 • www.fia.uk.com 2 of 6 Guidance on the Periodic Testing of Transportable Gas Containers used in Fire Extinguishing Systems BACKGROUND ........................................................................................................................................... 3 PERIODIC TESTING ................................................................................................................................. 4 REUSE OF CONTAINER VALVES ........................................................................................................ 5 REFERENCES ............................................................................................................................................... 6
Guidance on the Periodic Testing of Transportable Gas Containers • Version 2 • November 2015 • Tel: +44 (0)20 3166 5002 • www.fia.uk.com 3 of 6 BACKGROUND There is currently some confusion on the date at which extinguishing agent containers are required to be submitted for periodic testing under the Pressure Equipment Directive, the Transportable Pressure Equipment Directive and The Carriage of Dangerous Goods Regulations, as stated in the relevant Standards. This FIA guidance gives recommendations on how fire extinguishing system containers should be treated.
Guidance on the Periodic Testing of Transportable Gas Containers • Version 2 • November 2015 • Tel: +44 (0)20 3166 5002 • www.fia.uk.com 4 of 6 PERIODIC TESTING BS EN 1968:2002, applicable to seamless steel gas containers, BS EN 1802:2002, applicable to seamless aluminium alloy gas containers, BS EN 1803:2002, applicable to welded carbon steel gas containers, all state, in clause 3, that: • In the case of containers used for emergency purposes eg fire extinguishers, breathing apparatus, it is the responsibility of the person in possession (owner or user) to submit it for periodic inspection within the interval specified in Annex B. • In Annex B, the interval for containers used for CO2, Nitrogen and Argon and gas mixtures used as extinguishing agents is 10 years. In The Safe Use of Gas Containers, a guidance document issued by the Health and Safety Executive, under the heading ‘How to reduce risks’, sub heading ‘periodic examination’, makes references to Instruction P200 in ADR, as required by the The Carriage of Dangerous Goods Regulations. Instruction P200 also gives the periodic inspection intervals for CO2, Nitrogen and Argon containers as 10 years. Therefore, all fixed extinguishing agent containers (eg HFC-227ea (FM-200), FK 5-1-12 (Novec 1230), HFC-23 (FE-13), HFC-125 (FE-25), IG 541 (INERGEN), IG 01(Argon), IG 55 (ARGONITE), IG 100 (Nitrogen) and CO2 etc) must be inspected, re-tested and certified accordingly prior to the 10th anniversary of their manufacture or most recent test. Note 1: Containers found to be in service beyond the 10th anniversary of their manufacture or most recent test should be removed from service. Note 2: The previous dispensation, under BS 5430 Part 1 and Part 2, for fire protection containers to have retesting deferred to 20 years, no longer applies.
Guidance on the Periodic Testing of Transportable Gas Containers • Version 2 • November 2015 • Tel: +44 (0)20 3166 5002 • www.fia.uk.com 5 of 6 REUSE OF CONTAINER VALVES For safety reasons container valves should not be reused after removal from containers unless the following conditions are met: • The valve has been refurbished in accordance with manufacturer’s recommendations • The connection thread to the container and discharge hose are inspected to ensure they are within tolerance and undamaged Note: Where container valves use a taper thread form to marry to the container these are often found to be outside of the tolerances after a single fitment and removal.
Guidance on the Periodic Testing of Transportable Gas Containers • Version 2 • November 2015 • Tel: +44 (0)20 3166 5002 • www.fia.uk.com 6 of 6 Tudor House, Kingsway Business Park, Oldfield Road, Hampton, Middlesex TW12 2HD Tel: +44 (0)20 3166 5002 • www.fia.uk.com DISCLAIMER The information set out in this document is believed to be correct in the light of information currently available but it is not guaranteed and neither the Fire Industry Association nor its officers can accept any responsibility in respect of the contents or any events arising from use of the information contained within this document. REFERENCES • Safe Use of Gas Containers , Health And Safety Executive http://www.hse.gov.uk/press/2002/e02100.htm • The Carriage of Dangerous Goods and Use of Transportable Pressure Equipment Regulations 2009 (CDG 2009) Update Regulations http://www.hse.gov.uk/cdg/manual/adrcarriage.htm • ADR 2015, UNECE http://www.unece.org/trans/danger/publi/adr/adr2015/15ContentsE.html
Annex D UR Z17 - Procedural Requirements for Service Suppliers
Z17
Page 1 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont) Procedural Requirements for Service Suppliers
CONTENTS
General
Objective
Definitions
Application
Procedure for Approval and Certification
Certification
Information Regarding Alterations to the Certified Service Operating System
Cancellation of Approval
Existing Approvals
Annex 1 Special Requirements for Various Categories of Service Suppliers
Revision notes:
Rev.4 added in Annex, Section 10, 11 & 12, with reference in 3.1.2.
Rev.5 clarified applicability to thickness measurement companies in 3.1.1 and Annex 1,
- 1.
Rev.6 is to be uniformly implemented by IACS Societies and Associates from 1 January 2008.
Rev.7: Section 13 is added to Annex 1. This section applies to requests for recognition of test laboratories received on or after 1 January 2008.
Rev.8: Reference to IACS Recommendations 101 and 102 added.
Rev.9: Includes procedures for approval of test laboratories against res. MSC.288(87)
and applies to requests for recognition of approval of testing laboratories received on or
after 1 July 2013. However, deletion of the reference to PR 34 in Rev.9 applies from
1 July 2012.
Rev.10: Full document review carried out - Rev.10 is to be uniformly implemented by IACS Societies from 1 January 2016.
Rev.11: Full document review in order to verify the compliance with R.O. Code, IMO Res. MSC 349(92), carried out - Rev.11 is to be uniformly implemented by IACS Societies from 1 July 2016.
Rev.12: Section 15 of Annex 1 revised - Rev.12 is to be uniformly implemented by IACS Societies from 1 January 2018. Z17 (1997) (Rev.1 June 1999) (Rev.2 Nov 1999) (Rev.3 July 2002) (Rev.4 July 2003) (Rev.5 Feb 2004) (Rev.6 June 2007) (Rev.7 Nov 2007) (Rev.8 July 2008) (Rev.9 June 2012) (Corr.1 Aug 2012) (Rev.10 Jan 2015) (Rev.11 June 2015) (Rev.12 Nov 2016)
Z17
Page 2 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont) 1. General
- 1
To approve firms providing services, such as measurements, tests or maintenance of safety systems and equipment, the Society is to apply procedures in this unified requirement and relevant Annex 1.
Objective 2.1 The objective of this procedure is to set minimum requirements for approval and certification of service suppliers and is applicable to both initial and renewal audits.
Definitions
Manufacturer: A company that manufactures equipment required to be periodically serviced and/or maintained.
Service Supplier (A Service Supplier or category of Service Supplier may be referred to here after simply as ‘supplier’): A person or company, not employed by an IACS Member, who at the request of an equipment manufacturer, shipyard, vessel's owner or other client acts in connection with inspection work and provides services for a ship or a mobile offshore drilling unit such as measurements, tests or maintenance of safety systems and equipment, the results of which are used by surveyors in making decisions affecting classification or statutory certification and services.
Agent: A Person or Company authorised to act for or to represent a Manufacturer or
approved/recognized service supplier.
Subsidiary: A Company partly or wholly owned by a Manufacturer or approved/recognized service supplier.
Subcontractor: A Person or Company providing services to a Manufacturer or approved/recognized service supplier, with a formal contract defining the assumption of the obligations of the service supplier.
Z17
Page 3 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont) 4. Application
- 1
This procedure applies to the approval of the following categories of service suppliers:
- 1.1 Statutory services
• Firms engaged in servicing inflatable liferafts, inflatable lifejackets, hydrostatic release
units, inflatable rescue boats, marine evacuation systems
• Firms engaged in inspections and testing of radio communication equipment
• Firms engaged in inspections and maintenance of self contained breathing apparatus
• Firms engaged in annual performance testing of Voyage Data Recorders (VDR) and
simplified Voyage Data Recorders (S-VDR)
• Firms engaged in sound pressure level measurements of public address and general
alarm systems on board ships
• Firms engaged in inspections of low location lighting systems using photo luminescent materials and evacuation guidance systems used as an alternative to low-location lighting systems
• Firms engaged in the servicing and maintenance of lifeboats, launching appliances, on-
load release gear and davit-launched liferaft automatic release hooks.
• Firms engaged in inspection, performance testing and maintenance of Automatic
Identification Systems (AIS)
- 1.2 Classification and/or Statutory services:
• Firms engaged in thickness measurements on ships except
(1) non-ESP ships less than 500 gross tonnage and
(2) all fishing vessels.
• Firms carrying out in-water survey of ships and mobile offshore units
• Firms engaged in inspections and maintenance of fire extinguishing equipment and systems
• Firms engaged in tightness testing of closing appliances such as hatches, doors etc.
with ultrasonic equipment
• Firms engaged in measurements of noise level on board ships
• Firms engaged in examination of Ro-Ro ship’s bow, stern, side and inner doors
• Firms engaged in testing of coating systems in accordance with IMO Resolution
MSC.215(82), as amended, and IACS UI SC223 and/or MSC.288(87), as amended.
• Firms engaged in tightness testing of primary and secondary barriers of gas carriers
with membrane cargo containment systems for vessels in service
Z17
Page 4 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont) 4.1.3 Where a Society accepts work of a third party (eg., service supplier) approved by itself, the Society shall verify the performance of such services. For statutory service, the flag State may increase the scope of verification to be applied to these services. The process shall be defined within the Society’s quality management system. For the purpose of accountability to the flag State, the work performed by the third party (eg., service supplier) constitutes the work of the Society and shall be subject to the requirements incumbent upon the Society under the RO Code IMO MSC.349 (92) and MEPC.237(65).
- 2
Where the results of the following service providers are used by a Surveyor of a Society in making decisions affecting classification services then that service provider must be approved and verified by that Society.
• Firms engaged in thickness measurements on ships except
(1) non-ESP ships less than 500 gross tonnage and
(2) all fishing vessels.
• Firms carrying out in-water survey of ships and mobile offshore units
• Firms engaged in tightness testing of closing appliances such as hatches, doors etc.
with ultrasonic equipment
- 3
Where such services are used by Surveyors in making decisions affecting statutory certification and service, the firms are subject to approval and verification by the Society where the Society is so authorised by the relevant flag Administration (i.e. the flag of the ship on which the servicing is to be done or the service equipment is to be used). For such services the Society may accept approvals done by:
i. the flag Administration itself,
ii. duly authorized organizations acting on behalf of the flag Administration, or
iii. other organizations those are acceptable to the flag Administration (e.g. other
governments, etc.).
- 4
Use of the approved service suppliers is not mandatory for the following services, unless instructed otherwise by the flag Administration with respect to statutory certification
• Firms engaged in inspections of low location lighting systems using photo luminescent materials and evacuation guidance systems used as an alternative to low-location lighting systems
• Firms engaged in sound pressure level measurements of public address and general
alarm systems on board ships
• Firms engaged in measurements of noise level onboard ships
• Firms engaged in testing of coating systems in accordance with IMO Resolution
MSC.215(82) as amended and IACS UI SC223 and/or MSC.288(87) as amended
• Firms engaged in examination of Ro-Ro ships bow, stern, side and inner doors
Z17
Page 5 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont) 4.5 Detailed requirements specific to the various categories of suppliers are given in Annex
- National and/or international requirements may give additional requirements. References
to such national and/or international requirements are given in Annex 1.
Z17
Page 6 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont) 5. Procedure for Approval and Certification
- 1
Submission of documents
- 1.1 The following documents are to be submitted to the Society for review. General
requirements concerning suppliers are given in 5.2, and specific requirements as relevant, in Annex 1.
• Outline of company, e.g. organisation and management structure, including subsidiaries
to be included in the approval/certification
• List of nominated agents, subsidiaries and subcontractors
• Experience of the company in the specific service area
• For categories of Service Suppliers that require authorization from manufacturers,
manufacturer’s documentary evidence that the Service Supplier has been authorized or
licensed to service the particular makes and models of equipment for which approval is
sought shall be provided.
• List of operators/technicians/inspectors documenting training and experience within the
relevant service area, and qualifications according to recognised national, international
or industry standards, as relevant
• Description of equipment used for the particular service for which approval is sought
• A guide for operators of such equipment
• Training programmes for operators/technicians/inspectors
• Check lists and record formats for recording results of the services referred to in
Annex 1
• Quality Manual and/or documented procedures covering requirements in 5.5
• Documented procedures for communication with the crew prior to commencing work, so
that it is safe to decommission the equipment being maintained, and to provide a safe
system of work in place
• Evidence of approval/acceptance by other bodies, if any
• Information on the other activities which may present a conflict of interest
• Record of customer claims and of corrective actions requested by certification bodies
- 2
General requirements:
- 2.1 Extent of Approval – The supplier shall demonstrate, as required by 5.2.2 – 5.2.11, that
it has the competence and control needed to perform the services for which approval is sought.
- 2.2 Training of personnel – The supplier is responsible for the qualification and training of
its personnel to a recognised national, international or industry standard as applicable. Where such standards do not exist, the supplier is to define standards for the training and qualification of its personnel relevant to the functions each is authorised to perform. The
Z17
Page 7 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont) personnel shall also have adequate experience and be familiar with the operation of any necessary equipment. Operators/technicians/inspectors shall have had a minimum of one year tutored on-the-job training. Where it is not possible to perform internal training, a program of external training may be considered as acceptable.
- 2.3 Supervision – The supplier shall provide supervision for all services provided. The
responsible supervisor shall have had a minimum of two years of experience as an operator/technician/inspector within the activity for which the supplier is approved. For a supplier consisting of one person, that person shall meet the requirements of a supervisor.
- 2.4 Personnel records – The supplier shall keep records of the approved
operators/technicians/inspectors. The record shall contain information on age, formal education, training and experience for the services for which they are approved.
- 2.5 Equipment and facilities – The supplier shall have the necessary equipment and
facilities for the service to be supplied. A record of the equipment used shall be kept and available. The record shall contain information on maintenance and results of calibration and verifications. The Society shall assess and record the validity of previous measuring results when the equipment is found not to conform to requirements. The Society shall take appropriate action on the equipment affected.
- 2.6 Control of data:
When computers are used for the acquisition, processing, recording, reporting, storage, measurement assessment and monitoring of data, the ability of computer software to satisfy the intended application shall be documented and confirmed by the service supplier. This shall be undertaken prior to initial use and reconfirmed as necessary. Note: Commercial off-the-shelf software (e.g. wordprocessing, database and statistical programmes) in general use within their designed application range may be considered to be sufficiently validated and do not require any subsequent confirmation.
- 2.7 Where several servicing stations are owned by a given company, each station is to be
assessed and approved except as specified in 5.5.3
- 2.8 Procedures – The supplier shall have documented work procedures covering all
services supplied.
- 2.9 Subcontractors – The supplier shall give information of agreements and arrangements if
any parts of the services provided are subcontracted. Particular emphasis shall be given to quality management by the supplier in following-up such subcontracts. Subcontractors providing anything other than equipment shall also meet the requirements of sections 5.2 and 5.5.
- 2.10 Verification – The supplier shall verify that the services provided are carried out in
accordance with approved procedures.
- 2.11 Reporting – The report shall be prepared in a form acceptable to the Society. The
report should detail the results of inspections, measurements, tests, maintenance and/or repairs carried out. Special guidelines may be given in Annex 1. The report shall include a copy of the Certificate of Approval.
- 2.12 Documented procedures and instructions should be available for the recording of
damages and defects found during inspection, servicing and repair work. This documentation is to be made available upon request.
Z17
Page 8 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont) 5.3 Auditing of the Supplier – Upon reviewing the submitted documents with satisfactory result, the supplier is audited in order to ascertain that the supplier is duly organised and managed in accordance with the submitted documents, and that it is considered capable of conducting the services for which approval/certification is sought.
- 4
Certification is conditional on a practical demonstration of the performance of the specific service as well as satisfactory reporting being carried out. At renewal audits, evidence of performance, verified by class surveyor, since the previous audit is sufficient to satisfy this requirement.
- 5
Quality System
- 5.1 The supplier shall have a documented system covering at least the following:
• code of conduct for the relevant activity
• maintenance and calibration of equipment
• training programmes for operators/technicians/inspectors
• supervision and verification to ensure compliance with operational procedures
• recording and reporting of information
• quality management of subsidiaries, agents and subcontractors
• job preparation
• periodic review of work process procedures, complaints, corrective actions, and
issuance, maintenance and control of documents
- 5.2 A documented Quality system complying with the most current version of ISO 9000
series and including the above items, would be considered acceptable.
- 5.3 If a manufacturer of equipment (and/or its service supplier) applies to a Society for
inclusion of its nominated agents and/or subsidiaries in the approval, then it must have implemented a quality system certified in accordance with the most current version of ISO 9000 series. The quality system must contain effective controls of the manufacturer’s (and/or service supplier’s) agents and/or subsidiaries. The nominated agents/subsidiaries must also have in place an equally effective quality system complying with the most current version of ISO 9000 series. Such approvals shall be based upon an evaluation of the quality system implemented by the parent company against the most current version of ISO 9000 series. The Society may require follow-up audits on such agents or subsidiaries against the most current version of ISO 9000 series to confirm adherence to this quality system.
- 6
Service Suppliers Relations with the Equipment Manufacturer
- 6.1 A company which works as a service station for manufacturer(s) of equipment (and as a
service supplier in this field), shall be assessed by the manufacturer(s) and nominated as their agent. The manufacturer shall ensure that appropriate instruction manuals, material etc. are available for the agent as well as proper training of the agent’s technicians. Such suppliers shall be approved either on a case by case basis, or in accordance with 5.5.3.
Z17
Page 9 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont) 6. Certification
- 1
Upon satisfactory completion of both the audit of the supplier and the demonstration test, as applicable, the Society may issue a Certificate of Approval stating that the supplier’s service operation system has been found to be satisfactory and that the results of services performed in accordance with that system may be accepted and utilised by the Society’s Surveyors in making decisions affecting classification or statutory certification, as relevant. The Certificate shall clearly state the type and scope of services and any limitations or restrictions imposed including type of equipment and/or names of Manufacturers of equipment where this is a limiting restraint. The supplier may also be included in the Society’s record of approved service suppliers.
- 2
Renewal or endorsement of the Certificate is to be made at intervals not exceeding five (5) years by verification through audits that approved conditions are maintained or, where applicable, on expiry of the supplier’s approval received from an equipment Manufacturer, whichever comes first. In the latter case, the Society is to be informed in due course by the Service Supplier. Individual Societies may require renewal or endorsement of the Certificate at intervals shorter than five (5) years and may require intermediate audits. For firms engaged in thickness measurements, renewal/endorsement of the Certificate is to be made at intervals not exceeding 3 years by verification that original conditions are maintained.
Z17
Page 10 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont) 7. Information Regarding Alterations to the Certified Service Operating System
- 1
When any alteration to the certified service operating system of the supplier is made, such alteration is to be immediately informed to the Society. Re-audit may be required when deemed necessary by the Society.
Cancellation of Approval 8.1 The Society reserves the right to cancel the approval and to inform the IACS Members accordingly (For Firms engaged in thickness measurements refer to PR23).
- 2
Approval may be cancelled in the following cases:
- 2.1 Where the service was improperly carried out or the results were improperly reported.
- 2.2 Where a Surveyor finds deficiencies in the approval service operating system of the
supplier and appropriate corrective action is not taken.
- 2.3 Where alterations have been made to the Company’s Quality System relevant to the
service supplier certificates, without written notification to the Society.
- 2.4 Where the intermediate audit, if requested as per 6.2, has not been carried out.
- 2.5 Where wilful acts or omissions are ascertained.
- 2.6 Where any deliberate misrepresentation has been made by the Service Supplier.
- 3
A supplier whose approval was cancelled, may apply for re-approval provided it has corrected the non-conformities which resulted in cancellation, and the Society is able to confirm it has effectively implemented the corrective action.
- 4
Expiration or cancellation of the Supplier’s parent company approval automatically invalidates approval of all agents and subsidiaries if these are certified according to 5.5.3.
Existing Approvals Approvals for the categories of service suppliers granted before the date of implementation of UR Z17 by a society may remain valid as stated in the respective certificates for a period up to but not exceeding 3 years. Renewals of such certificates must be carried out in accordance with UR Z17.
Z17
Page 11 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont) ANNEX 1
Special Requirements for Various Categories of Service Suppliers
- Firms engaged in thickness measurements on ships
- 1
Extent of engagement – Thickness measurement of structural material of ships except
(1) non-ESP ships less than 500 gross tonnage and
(2) all fishing vessels.
- 2
Supervisor – The responsible supervisor shall be qualified according to a recognised national or international industrial NDT standard (e.g. EN 473 level II as amended or ISO 9712 level II as amended).
- 3
Operators – The operators carrying out the measurements shall be certified to a recognised national or international industrial standard (e.g. EN 473 level I as amended or ISO 9712 level I as amended) and shall have adequate knowledge of ship structures sufficient to elect a representative position for each measurement.
- 4
Equipment – On coated surfaces, instruments using pulsed echo technique (either with oscilloscope or digital instruments using multiple echoes, single crystal technique) are required. Single echo instruments may be used on uncoated surfaces, which have been cleaned and ground.
- 5
Procedures – Documented work procedures are at least to contain information on inspection preparation, selection and identification of test locations, surface preparation, protective coating preservation, calibration checks, and report preparation and content.
- 6
Reporting – The report shall be based on the guidelines given in UR Z7, UR Z7.1, UR Z7.2, Z10.1, Z10.2, Z10.3, Z10.4 and Z10.5, as relevant.
- 7
Verification – The supplier must have the Surveyor’s verification of each separate job, documented in the report by the attending Surveyor(s) signature.
Z17
Page 12 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont)
- Firms engaged in tightness testing of closing appliances such as hatches, doors
etc. with ultrasonic equipment
- 1
Extent of engagement – Ultrasonic tightness testing of closing appliances such as hatches, doors etc.
- 2
Operators – The operator is to have the following qualifications:
• Have knowledge of different closing appliances such as hatches, doors etc. including
their design, functioning and sealing features
• Have experience with the operation and maintenance of different closing appliances
such as hatches, doors etc.
• Be able to document theoretical and practical training onboard in using the ultrasonic
equipment specified
- 3
It shall be demonstrated to the Surveyor that the ultrasonic equipment is fit for the purpose of detecting leakages in closing appliances.
- 4
Procedures – The supplier shall have documented work procedures which shall include the manual for the ultrasonic equipment specified, its adjustment, its maintenance, its operation and approval criteria.
Z17
Page 13 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont)
- Firms carrying out in-water survey of ships and mobile offshore units
- 1
Extent of engagement – In-water survey of ships and mobile offshore units by diver or Remote Operated Vehicle.
- 2
Training of personnel – The supplier is responsible for the qualification of its divers and the diving equipment utilised when carrying out inspection. Knowledge of the following shall be documented:
• Ship’s underwater structure and appendages, tail shaft, propeller, rudder and its
bearings, etc.
• Non-destructive testing in accordance with a recognised national or international
industrial NDT standard. This requirement only applies if an in-water survey company
performs non-destructive testing
• Bearing clearance measurements on rudders and tail shaft
• Under-water video monitoring with TV-monitors on deck, as well as still picture work
• Operation of under-water communication system
• Special equipment and tools e.g. hull cleaners, grinders, cutters, etc.
- 3
A plan for training of personnel in the reporting system, minimum Rule requirements for relevant ship types, ship’s underwater structure, measuring of bearing clearances, the recognition of corrosion damage, buckling and deteriorated coatings, etc. shall be included.
- 4
Supervisor – The supervisor shall be qualified according to the supplier’s general requirements and shall have a minimum of two years’ experience as a diver carrying out inspection.
- 5
Divers carrying out inspection – The diver carrying out the inspection shall have had at least one year’s experience as an assistant diver carrying out inspections (including participation in a minimum of 10 different assignments).
- 6
Equipment – The following shall be available:
• Closed circuit colour television with sufficient illumination equipment
• Two-way communication between diver and surface staff
• Video recording device connected to the closed circuit television
• Still photography camera
• Equipment for carrying out thickness gauging, non-destructive testing and
measurements, e.g. clearances, indents, etc., as relevant to the work to be performed
• Equipment for cleaning of the hull
• Remote Operated Vehicle, if applicable
Z17
Page 14 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont) 3.7 Procedures and guidelines – The supplier shall have documented operational procedures and guidelines for how to carry out the inspection and how to handle the equipment. These shall include:
• Two-way communication between diver and surface
• Video recording and closed circuit television operation
• Guidance of the diver along the hull to provide complete coverage of the parts to be
inspected
• Guidance for the operation and maintenance of the Remote Operated Vehicle, if
applicable
- 8
Verification – The supplier must have the Surveyor’s verification of each separate job, documented in the report by the attending Surveyor(s) signature.
Z17
Page 15 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont)
- Firms engaged in inspection and maintenance of fire extinguishing equipment and
systems
- 1
Extent of engagement – inspections and maintenance of fire-extinguishing equipment and systems such as fixed fire extinguishing systems, portable fire extinguishers and fire detection and alarm systems.
- 2
Extent of Approval
• Service Suppliers are to have professional knowledge of fire theory, fire-fighting and fire-extinguishing appliances sufficient to carry out the maintenance and/or inspections, and to make the necessary evaluations of the condition of the equipment
• In demonstrating professional knowledge, Service Suppliers are to have an
understanding of the various types of fires and the extinguishing media to be used on
them
• For fixed fire-extinguishing systems, Service Suppliers are to demonstrate an
understanding of the principles involved with gas, foam, deluge, sprinkler and water-
mist systems, as relevant for the approval being sought
- 3
Procedures
• Service Suppliers are to have documented procedures and instructions on how to carry
out the servicing of the equipment and/or system. These are to either contain or make
reference to the Manufacturer’s servicing manuals, servicing bulletins, instructions and
training manuals, as appropriate, and to international requirements
• Additionally they are to make reference to any requirements (e.g. what markings should
be appended to the equipment/system)
- 4
Reference Documents - The Service Supplier is to have access to the following
documents:
• Manufacturer’s servicing manuals, servicing bulletins, instructions and training manuals,
as appropriate
• Type Approval certificates showing any conditions that may be appropriate during the
servicing and/or maintenance of fire-extinguishing equipment and systems
• SOLAS, MSC.1/Circular.1318 (Guidelines for the Maintenance and Inspections of Fixed
Carbon Dioxide Fire-Extinguishing Systems), International Code for Fire Safety
Systems (FSS Code), ISO 6406 (Periodic inspection and testing of seamless steel gas
cylinders), and any documentation specified in the authorisation or license from the
equipment manufacturer
• MSC/Circ.670 (Guidelines for the Performance and Testing Criteria and Surveys of
High Expansion Foam Concentrates for fixed Fire-Extinguishing Systems)
• MSC/Circ.798 (Guidelines for the Performance and Testing Criteria and Surveys of
Medium Expansion Foam Concentrates for fixed Fire-Extinguishing Systems)
• MSC/Circ.799 ((Guidelines for the Performance and Testing Criteria and Surveys of
Expansion Foam Concentrates for fixed Fire-Extinguishing Systems of Chemical
Tankers)
Z17
Page 16 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont) • MSC.1/Circ.1312 (Revised Guidelines for the Performance and Testing Criteria and
Surveys of Foam Concentrates for fixed Fire-Extinguishing Systems as corrected by
MSC/Circ.1312/Corr.1)
• MSC.1/Circ.1432 (Revised Guidelines for the maintenance and Inspection of Fire
Protection Systems and Appliances)
• IMO Res. A. 951(23) – Improved guidelines for marine portable fire extinguishers
• MSC.1/Circ.1370 – Guidelines for the design, construction and testing of fixed
hydrocarbon gas detection systems
• Guidelines adopted by IMO for fire extinguishing equipment and systems specifically
intended for service by service suppliers
- 5
Equipment and Facilities
- 5.1 General Requirements
• If Service Suppliers undertake shore-based inspecting and maintenance, they should
maintain and implement procedures for workshop cleanliness, ventilation and
arrangement, with due cognisance of the spares and extinguishing media being stored,
to ensure safe and effective working procedures
• Service Suppliers undertaking inspecting and maintenance of equipment and systems
onboard are to provide the appropriate facilities to either complete the work onboard or
remove the necessary items to their workshops
- 5.2 Equipment
Sufficient and appropriate spares and tools are to be available as applicable, which should include:
• Various scales to weigh items
• Means to hydrostatically pressure test components/systems/storage bottles
• Liquid/gas, flow meters, as appropriate
• Pressure gauges or manometers
• In the cases of foam concentrates and portable fire-extinguishers, chemical analysis
equipment and a testing bay, respectively; and
• Specific equipment/spares as may be specified by Manufacturer
• Level measuring equipment for bottles
• Recharging facilities for pressurized bottles, extinguishers and cartridges
Z17
Page 17 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont)
- Firms engaged in servicing inflatable liferafts, inflatable lifejackets, hydrostatic
release units, inflatable rescue boats, marine evacuation systems
- 1
Extent of engagement
• Servicing of inflatable liferafts, inflatable lifejackets, hydrostatic release units and/or
inflatable rescue boats
• Servicing of marine evacuation systems
- 2
Equipment and facilities – IMO Res. A.761(18) as amended by MSC.55(66) gives recommendations on conditions for the approval of servicing stations for inflatable liferafts which shall be observed as relevant. Where inflatable liferafts are subject to extended service intervals, MSC.1/Circ.1328 should also be followed.
- 3
Procedures and instructions – The supplier shall have documented procedures and instructions for how to carry out service of equipment. Where inflatable liferafts are subject to extended service intervals in accordance with the requirements of SOLAS Regulation III/20.8.3, MSC.1/Circ.1328 should be followed in addition to Resolution A.761(18) as amended by MSC.55(66).
- 4
The supplier shall provide evidence that it has been authorised or licensed to service the particular makes and models of equipment for which approval is sought by the equipment’s manufacturer.
- 5
Reference Documents - The Service Supplier is to have access to the following documents:
• IMO - Resolution A.761(18) - Recommendation on Conditions for the Approval of
Servicing Stations for Inflatable Liferafts - (adopted on 4 November 1993), amended by
Resolution MSC.55(66)
• IMO - Resolution MSC.55(66)
• IMO – MSC.1/Circ.1328 – Guidelines for the Approval of Inflatable Liferafts Subject to
Extended Service Intervals Not Exceeding 30 Months
• Manufacturer’s servicing manuals, servicing bulletins, instructions and training manuals,
as appropriate
• Type Approval certificates, showing any conditions that may be appropriate during the
servicing and/or maintenance of inflatable liferafts, inflatable rescue boats, inflatable
lifejackets, and hydrostatic release units
• LSA code/Chap.IV, 1995 SOLAS Conference Resolution 4 regarding marine evacuation
systems
Z17
Page 18 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont)
- Firms engaged in inspections and testing of radio communication equipment
- 1
Extent of engagement
• Surveys, inspection, testing, and/or measurement of radio equipment aboard ships or
mobile offshore units for compliance with SOLAS regulations
• Annual testing of 406 MHz satellite EPIRBs for compliance with SOLAS Regulation
IV/15.9
• The principles of this section also apply to Service Suppliers involved in inspection,
performance testing and maintenance of Automatic Identification Systems (AIS).The
Service Supplier is to be familiar with the equipment with which it will be involved, such
as being a service agent for the equipment manufacturer
- 2
Reference documents – The supplier shall have access to the following documents:
• SOLAS 1974 as amended
• IMO Res. A.789(19): Specification on the survey and certification functions of
recognised organisations acting on behalf of the administration
• MSC/Circ.1040/Rev.1 – Guidelines on Annual Testing of 406 MHZ Satellite EPIRBs
• MSC.1/Circ.1252 – Guidelines on Annual Testing of the Automatic Identification System
(AIS)
• SN/Circ.227, SN/Circ.227/Corr.1 and 245 – Guidelines for the Installation of a
Shipborne Automatic Identification System (AIS) and amendments thereto
• ITU Radio Regulations
• IMO Performance Standards for the equipment for which the Service Supplier is
approved
• Flag State Administration requirements
• Relevant parts, if any, of the Society’s Rules and Guidelines
- 3
Supervisor – The supervisor shall have a minimum two years education from a technical school, experience as inspector, and should preferably hold a General Operator’s Certificate (GOC) or a GMDSS Radioelectronic Certificate (REC), recognised by the ITU, to operate or test radio transmitters. He should be aware of any local conditions for radio signal propagation, of regional radio stations and their facilities, and of the GMDSS infrastructure.
- 4
Radio inspector – The inspector carrying out the inspection shall have passed the internal training of the supplier in Radiotelephony, GMDSS, and initial and renewal surveys, as applicable. The inspector shall also have at least one year’s technical school training or as alternative hold evidence that he followed a technical course approved by the relevant Administration, at least one year’s experience as an assistant radio inspector and should preferably hold an appropriate National Radio Operators Certificate, recognised by the ITU, such as a GMDSS General Operator’s Certificate (GOC) or a GMDSS Radioelectronic Certificate (REC). He should be aware of any local conditions for radio signal propagation, of regional radio stations and their facilities, and of the GMDSS infrastructure.
Z17
Page 19 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont) 6.5 Equipment and facilities
- 5.1 The supplier shall have the major and auxiliary equipment required for correctly
performing the inspection. A record of the equipment used shall be kept. The record shall contain information on manufacturer and type of equipment, and a log of maintenance and calibrations.
- 5.2 A standard which is relevant to the radio equipment to be tested shall be available for
the equipment and shall be cited in the inspection report.
- 5.3 For equipment employing software in conjunction with the testing/examination, this
software shall be fully described and verified.
- 6
Minimum required instruments:
• Equipment for measuring frequency, voltage, current and resistance
• Equipment for measuring output and reflect effect on VHF and MF/HF
• Equipment for measuring modulation on MF/HF and VHF (AM, FM, PM)
• Acid tester for checking specific gravity of lead batteries
• Tester for checking of correct output from Free-Float Satellite EPIRB
• Equipment for testing the performance of Automatic Identification Systems (AIS)
- 7
Procedures and instructions – The supplier shall have documented procedures and instructions for how to carry out testing and examination of radio equipment. Procedures and instructions for operating each item of the testing/inspection equipment shall also be kept and be available at all times.
Z17
Page 20 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont)
- Firms engaged in inspections and maintenance of self contained breathing
apparatus
- 1
Extent of Engagement - inspections and maintenance of self-contained breathing apparatus, Emergency Escape Breathing Devices (EEBD)
- 2
Extent of Approval
• The supplier shall document and demonstrate that it has knowledge of the equipment
and systems sufficient to carry out the inspections and testing of self-contained
breathing apparatus to identify standards and to make the necessary evaluation of the
condition of the equipment
• In demonstrating professional knowledge, Service Suppliers are to have an
understanding of the operational requirements involved with self-contained breathing
apparatus and how these are to be maintained
• Additionally, Service Suppliers are to demonstrate the necessary safety requirements
applicable to such equipment
- 3
Procedures
• Service Suppliers are to have documented procedures and instructions on how to carry
out the servicing of the equipment and/or system. These are to either contain or make
reference to the Manufacturer’s servicing manuals, servicing bulletins, instructions and
training manuals, as appropriate
• Additionally they are to make reference to any requirements (e.g. what markings should
be appended to the equipment/system) and how they should be applied
- 4
Reference Documents - The Service Supplier is to have access to the following documents:
• Manufacturers’ servicing manuals, servicing bulletins, instructions and training manuals,
as appropriate
• Type Approval certificates showing any conditions which may be appropriate during the
servicing and/or maintenance of self-contained breathing apparatus
- 5
Equipment and Facilities
- 5.1 General Requirements
• If Service Suppliers undertake shore-based inspecting and maintenance, they should
maintain and implement procedures for workshop cleanliness, ventilation and
arrangement, with due cognisance of the spares and pressurised bottles being stored,
to ensure safe and effective working procedures
• Service Suppliers undertaking inspecting and maintenance of equipment and systems
onboard are to provide the appropriate facilities to either complete the work onboard or
remove the necessary items to their workshops
Z17
Page 21 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont) 7.5.2 Equipment
• Sufficient and appropriate spares and tools are to be available for repair, maintenance
and servicing of self-contained breathing apparatus in accordance with the
requirements of the Manufacturers
• These are to include, as required by the self-contained breathing apparatus equipment
and/or systems:
• Various scales to weigh items
• Means to hydrostatically pressure test components/systems/storage bottles
• Flow meters; and
• Pressure gauges or manometers
• Equipment for checking air quality
• Recharging facilities for breathing apparatus
Z17
Page 22 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont)
- Firms engaged in examination of Ro-Ro ships bow, stern, side and inner doors
- 1
Extent of engagement - inspection of securing and locking devices, hydraulic operating system, electric control system for the hydraulics, electric indicator systems, and supporting, securing and locking devices and tightness testing.
- 2
The supplier is to be certified to the most current version of ISO 9000 series.
- 3
Supervision - In addition to 5.2.3, the requirement to have had a minimum of two years experience as operator/technician/inspector within the activity, a Supervisor is to have a minimum two years related education from a technical school.
- 4
Training of personnel - Operators carrying out Non-Destructive Examination (NDE) are to be qualified to a recognised National or International Standard for the methods used.
- 5
Reference documents - The supplier shall have access to the following reference documents:
• IMO - International Convention on the Safety of Life at Sea (SOLAS) 74/78, as
amended
• ISO 9002:1994 - Quality systems - Model for quality assurance in production,
installation and servicing
• UR Z24 - Survey Requirements for Shell and Inner Doors of Ro-Ro ships, or its
equivalent, by the relevant class society
- 6
Required Equipment
- 6.1 For Inspection of Supporting Securing and Locking Devices, Hinges and Bearings:
• Equipment for measuring clearances (i.e. feeler gauges, vernier calipers, micrometers).
• Non-destructive examination (i.e. dye penetrant, magnetic particle inspection)
- 6.2 For Tightness Testing:
• Ultrasonic leak detector or equivalent
- 6.3 For Inspection of Hydraulic Operating System:
• Pressure gauges
• Particle counter for analysing the quality of hydraulic fluid
- 6.4 For Inspection of Electric Control System and Indication System:
• Digital multi-meter
• Earth fault detector
- 7
Procedures and Instructions
- 7.1 The supplier shall have access to drawings and documents, including the Operating
and Inspection Manual.
Z17
Page 23 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont) 8.7.2 The supplier shall have access to the service history of the doors.
- 7.3 The supplier should use, complete and sign a checklist which has been found
acceptable by the classification society.
Z17
Page 24 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont)
- Firms engaged in annual performance testing of Voyage Data Recorders (VDR) and
simplified Voyage Data Recorders (S-VDR)
- 1
Extent of engagement – Testing and servicing of Voyage Data Recorders (VDR) and Simplified Voyage Data Recorders (S-VDR) in accordance with SOLAS Chapter V Regulation 18.8 and IMO - MSC.1/Circular.1222 - Guidelines on Annual Testing of Voyage Data Recorders (VDR) and Simplified Voyage Data Recorders (S-VDR), as applicable.
- 2
Extent of Approval
- 2.1 The supplier shall provide evidence that he has been authorised or licensed by the
equipment’s manufacturer to service the particular makes and models of equipment for which approval is sought.
- 2.2 Where the Service Supplier is also the Manufacturer of the Voyage Data Recorder
(VDR) or Simplified Voyage Data Recorder (S-VDR) and has elected to apply IMO - MSC.1/Circular.1222 - Guidelines on Annual Testing of Voyage Data Recorders (VDR) and Simplified Voyage Data Recorders (S-VDR) in its entirety for the purpose of acting as a Service Supplier engaged in annual performance testing, the following is to apply:
• The Manufacturer is responsible for appointing Manufacturer’s Authorised Service
Stations to carry out annual performance testing
• The Manufacturer is required to be an Approved Service Supplier and is to satisfy the
requirements for Service Suppliers engaged in annual performance testing of Voyage
Data Recorders (VDR) and Simplified Voyage Data Recorders (S-VDR), as applicable
• The Manufacturer’s Authorised Service Station is not required to be an Approved
Service Supplier
• The Manufacturer is to demonstrate that IMO - MSC.1/Circular.1222 - Guidelines on
Annual Testing of Voyage Data Recorders (VDR) and Simplified Voyage Data
Recorders (S-VDR) is applied in its entirety
- 3
Procedures
- 3.1 The Service Supplier shall have documented procedures and instructions.
- 3.2 Where the Service Supplier is also the Manufacturer of the Voyage Data Recorder
(VDR) or Simplified Voyage Data Recorder (S-VDR) and has selected to apply IMO - MSC.1/Circular.1222 - Guidelines on Annual Testing of Voyage Data Recorders (VDR) and Simplified Voyage Data Recorders (S-VDR) in its entirety for the purpose of acting as a Service Supplier engaged in annual performance testing, the following is to apply:
• The Manufacturer is to have documented procedures for the assessment and
authorisation of Manufacturer’s Authorised Service Stations who carry out annual
performance testing
• The Manufacturer is to have documented procedures for the review of Manufacturer’s
Authorised Service Stations annual performance test reports, analysis of the Voyage
Data Recorder (VDR) and Simplified Voyage Data Recorder (S-VDR) 12 hour log and
the issue of annual performance test certificates to the Owner/Operator
Z17
Page 25 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont) • The Manufacturer is to maintain a list of Manufacturer’s Authorised Service Stations
that can be accessed (by any available means, e.g. via a nominated contact point or
from the Manufacturer’s website) upon request
- 4
Reference Documents
- 4.1 The Service Supplier is to have access to the following documents:
• IMO - International Convention on the Safety of Life at Sea (SOLAS), 74/78, Ch V, Reg
- 8. – Approval, surveys and performance standards of navigational systems and
equipment and voyage data recorder
• IMO - MSC.1/Circular.1222 - Guidelines on Annual Testing of Voyage Data Recorders
(VDR) and Simplified Voyage Data Recorders (S-VDR) - (11 December 2006)
• IMO - Resolution A.861(20) (adopted on 27 November 1997) as amended by IMO
Resolution MSC.214(81) and revised by IMO Resolution MSC.333(90) - Performance
Standards for Shipborne Voyage Data Recorders (VDRs)
• IMO - Resolution MSC.163(78) - Performance Standards for Shipborne Simplified
Voyage Data Recorders (S-VDRs) - (adopted on 17 May 2004), as amended by IMO
Resolution 214(81)
- 4.2 The Service Supplier is to have access to applicable industry performance standards,
e.g.:
• IEC 61996 - Maritime navigation and radiocommunication equipment and systems -
Shipborne voyage data recorder (VDR)
• IEC 61996–2 - Maritime navigation and radio communication equipment and systems –
Shipborne voyage data recorder (VDR) – Part 2: Simplified voyage data recorded (S-
VDR) – Performance requirements, method of testing and required test results
- 4.3 The Service Supplier is also to have access to any documentation specified in the
authorisation or license from the equipment manufacturer.
- 5
Equipment and Facilities - In addition, the Service Supplier shall have equipment as specified in the authorisation or license from the equipment Manufacturer.
- 6
Reporting - Test Report
- 6.1 The Service Supplier shall issue a certificate of compliance as specified in the
International Convention on Safety of Life at Sea (SOLAS 1974), as amended, Ch V, Reg 18.8.
- 6.2 Annual Performance Test of VDR and S-VDR should be recorded in the form of the
model test report given in the Appendix to MSC.1/Circular.1222, signed and stamped by the Service Supplier and attached to the annual performance test certificate.
- 6.3 Where the Service Supplier is also the Manufacturer of the Voyage Data Recorder
(VDR) or Simplified Voyage Data Recorder (S-VDR) and has selected to apply IMO - MSC.1/Circular.1222 - Guidelines on Annual Testing of Voyage Data Recorders (VDR) and Simplified Voyage Data Recorders (S-VDR) in its entirety for the purpose of acting as a Service Supplier engaged in annual performance testing, the Manufacturer is to make arrangements for the following:
Z17
Page 26 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont) • Review of the Manufacturer’s Authorised Service Station annual performance test
report
• Analysis of the recorder’s 12 hour log
• Checking of the master record/database for the recorder
- 6.4 Issue of the annual performance test certificate to the Owner/Operator within 45 days of
completion of the annual performance test.
Z17
Page 27 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont)
- Firms engaged in inspections of low location lighting systems using photo
luminescent materials and evacuation guidance systems used as an alternative to low- location lighting systems
- 1 Extent of engagement – Luminance measurements on board ships of low location
lighting systems using photo luminescent materials.
- 2 Operators – The operator is to have the following qualifications:
• Have adequate knowledge of the applicable international requirements (namely SOLAS
reg. II-2/13.3.2.5, IMO Res. A.752(18) - Guidelines for the Evaluation, Testing and
Application of Low-Location Lighting on Passenger Ships, ISO 15370-2010, FSSS
Code Chapter 11)
• Be able to document theoretical and practical training onboard in using equipment
specified
- 3 Equipment – The measuring instrument shall incorporate a fast-response photometer
head with CIE (International Commission on Illumination) photopic correction and have a measurement range of at least 10-4 cd/m2 to 10 cd/m2.
- 4 Procedures – Documented work procedures are at least to contain information on
inspection preparation, selection and identification of test locations.
- 5 Reporting – The report shall conform to Annex C of ISO 15370-2010.
- 6 Verification – The supplier must have the Surveyor’s verification of each separate job,
documented in the report by the attending Surveyor’s signature.
- 7 Reference Documents
The Service Supplier is to have access to the following documents:
• IMO - International Convention on the Safety of Life at Sea (SOLAS), 74/78 Ch II-2, Pt
D, Reg 13.3.2.5 – Marking of escape routes
• IMO – Fire Safety Systems (FSS Code), Ch 11 – Low-location lighting systems
• IMO - Resolution A.752(18) - Guidelines for the Evaluation, Testing and Application of
Low-Location Lighting on Passenger Ships - (adopted on 4 November 1993)
• ISO 15370:2010 - Ships and marine technology - Low-location lighting on passenger
ships – Arrangement
• MSC/Circ.1168 – Interim guidelines for the testing, approval and maintenance of
evacuation guidance systems used as an alternative to low-location lighting systems
Z17
Page 28 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont)
- Firms engaged in sound pressure level measurements of public address and
general alarm systems on board ships
- 1 Extent of engagement – Sound pressure level measurements of public address and
general alarm systems on board ships.
- 2 Operators – The operator is to have the following qualifications:
• Have adequate knowledge of the applicable international requirements (SOLAS Reg.
III/4 and III/6, LSA CODE Chapter VII/7.2, IMO Code on alarms and indicators, 1995)
• Be able to document theoretical and practical training onboard in using equipment
specified
- 3 Equipment – The measuring instrument shall be an integrating sound level meter with
frequency analyser capabilities complying with IEC (International Electrotechnical Commission) 60651 and IEC 61672, type 1 precision class with, at least an A-weighting frequency response curve and 1/3 octave and 1 octave band filters, complying to IEC 61260, as appropriate for the measurements to be carried out. In addition microphones shall be of the random incidence type, complying with IEC 60651.
- 4 Procedures – Documented work procedures are at least to contain information on
inspection preparation, calibration, selection and identification of test locations.
- 5 Reporting – The report shall describe, as a minimum, the environmental conditions of
the tests and, for each test location, the ambient noise level or the speech interference level, as appropriate for the measurements to be carried out. The report shall conform to any other specific requirement of the Society.
- 6 Verification – The supplier must have the Surveyor’s verification of each separate job,
documented in the report by his signature.
- 7 Reference documents
The Service Supplier is to have access to the following documents:
• SOLAS 74/78, Ch III, Pt A, Reg 4 – Evaluation, testing and approval of life-saving
appliances and arrangements
• SOLAS 74/78, Ch III, Pt B, Reg 6 – Communications
• International Life-Saving Appliance (LSA) Code, Ch VII, Reg 7.2 – General alarm and
public address system
• IMO - Code on Alarms and Indicators, 1995 as amended
• IEC 60651 (2001-10) - Sound level meters
• IEC 61672 - Electroacoustics - Sound level meters
• IEC 61260 - Electroacoustics - Octave-band and fractional-octave-band filters
Z17
Page 29 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont)
- Firms engaged in testing of coating systems in accordance with IMO Resolution
MSC.215(82) as amended and IACS UI SC223 and/or MSC.288(87) as amended
- 1 Laboratories
- 1.1 Extent of Engagement - Testing of coatings systems according to IMO Resolution
MSC.215(82), as corrected by IMO MSC.1/Circ.1381 and amended by IMO Resolution 341(91) and IACS UI SC223 and/or MSC.288(87), as corrected by IMO MSC.1/Circ.1381 and amended by IMO Resolution 341(91).
- 1.2 The laboratory is to provide to the Society the following information:
• A detailed list of the Laboratory test equipment for the coating approval according to the
IMO Resolution MSC.215(82) as amended and/or MSC.288(87) as amended.
• A detailed list of reference documents comprising a minimum those referred to in IMO
Resolution MSC.215(82) as amended and/or MSC.288(87) as amended for the coating
approval.
• Details of test panel preparation, procedure of test panel identification, coating
application, test procedures and a sample test report.
• Details of exposure method and site for weathering primed test panels.
• A sample daily or weekly log/form for recording test conditions and observations
including unforeseen interruption of the exposure cycle with corrective actions.
• Details of any sub-contracting agreements (if applicable).
• Comparison test report with an approved coating system or laboratory if available.
- 1.3 Reporting – Reference is made to the following IACS Recommendations:
• Rec. 101: IACS Model Report for IMO Resolution MSC.215(82) Annex 1 “Test
Procedures for Coating Qualification”
• Rec. 102: IACS Model Report for IMO Resolution MSC.215(82) Annex 1 “Test
Procedures for Coating Qualification”, Section 1.7 – Crossover Test
- 1.4 Audit of the test laboratory is to be based on this procedure and the standards listed in
the IMO Resolution MSC.215(82) as amended and/or MSC.288(87) as amended for the coating approval.
Z17
Page 30 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont)
- Firms engaged in the servicing and maintenance of lifeboats, launching
appliances, on-load release gear and davit-launched liferaft automatic release hooks
- 1 Extent of engagement – Servicing and maintenance of lifeboats, launching appliances,
on-load release gear and davit-launched liferaft automatic release hooks.
- 2 Extent of Approval
- 2.1 The contents of this procedure apply equally to manufacturers when they are acting as
Service Suppliers.
- 2.2 Any Service Supplier engaged in the thorough examination, operational testing, repair
and overhaul of lifeboats, launching appliances, on-load release gear and davit-launched liferaft automatic release hooks carried out in accordance with SOLAS regulation III/20 should be qualified in these operations for each make and type of equipment for which they provide the service, and provide manufacturers documentary evidence that they have been so authorized or they are certified in accordance with an established system for training and authorization in accordance with MSC.1/Circ.1277, as amended.
- 2.3 In cases where an equipment manufacturer is no longer in business or no longer
provides technical support, Service Suppliers may be authorised for the equipment on the basis of prior authorization for the equipment and/or long term experience and demonstrated expertise as an authorized service provider.
- 3 Qualifications and Training of Personnel
Service Suppliers should be trained and qualified in the operations for which they are authorised, for each make and type of equipment for which they provide the service. Such training and qualification should include, as a minimum:
- 3.1 Employment and documentation of personnel certified in accordance with a
recognized national, international or industry standard as applicable, or an equipment manufacturer’s established certification program. In either case, the certification program should be based on the guidelines in the appendix for each make and type of equipment for which service is to be provided.
- 3.2 The education and training for initial certification of personnel should be documented
and address, as a minimum:
• Causes of lifeboat accidents
• Relevant rules and regulations, including International Conventions
• Design and construction of lifeboats, including on-load release gear and launching
appliances
• Education and practical training in the procedures specified in annex 1 of
MSC.1/Circ.1206/Rev.1 for which certification is sought
• Detailed procedures for thorough examination, operational testing, repair and overhaul
of lifeboats, launching appliances and on-load release gear, as applicable; and
• Procedures for issuing a report of service and statement of fitness for purpose based on
MSC.1/Circ.1206/Rev.1 (annex 1, paragraph 15)
Z17
Page 31 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont) 13.3.3 The education and training for the personnel should include practical technical training on actual inspection and maintenance using the equipment (lifeboats, launching appliances and/or on-load release gear) for which the personnel are to be certified. The technical training should include disassembly, reassembly, correct operation and adjustment of the equipment. Classroom training should be supplemented by field experience in the operations for which certification is sought, under the supervision of an experienced senior certified person.
- 3.4 At the time of initial certification and at each renewal of certification, the service
supplier shall provide documentation to verify personnel’s satisfactory completion of a competency assessment using the equipment for which the personnel are certified.
- 3.5 The Service Supplier shall require refresher training as appropriate to renew the
certification.
- 4 Reference Documents - The Service Supplier is to have access to the following
documents:
• IMO - MSC.1/Circ.1206/Rev.1, as amended, Measures to Prevent Accidents with
Lifeboats
• IMO – MSC.1/Circ.1277, as amended, Interim Recommendation on Conditions for
Authorization of Service Providers for Lifeboats, Launching Appliances and On-Load
Release Gear
• IMO – Resolution A.689(17), recommendation on testing of life-saving appliances and,
for life-saving appliances installed on board on or after 1 July 1999, Resolution
MSC.81(70), revised recommendation on testing of life-saving appliances
• For servicing and repair work involving disassembly or adjustment of on-load release
mechanisms, availability of the equipment manufacturer’s specifications and
instructions
• Type Approval certificate showing any conditions that may be appropriate during the
servicing and/or maintenance of lifeboats, launching appliances and on-load release
gear
- 5 Equipment and Facilities - The Service Supplier is to have access to the following:
• Sufficient tools, and in particular any specialized tools specified in the equipment
manufacturer’s instructions, including portable tools as needed for work to be carried
out on board ship
• Access to sufficient materials, spare parts and accessories as specified by the
equipment manufacturer for repairing lifeboats, launching appliances and on-load
release gear, as applicable
• For servicing and repair work involving disassembly or adjustment of on-load release
mechanisms, availability of genuine replacement parts as specified or supplied by the
equipment manufacturer
- 6 Reporting - The report should conform to the requirements of MSC.1/Circ.1206/Rev.1
(annex 1, paragraph 15). When repairs, thorough examinations and annual servicing are completed, a statement confirming that the lifeboat arrangements remain fit for purpose should be promptly issued by the Service Supplier.
Z17
Page 32 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont)
- Firms engaged in measurements of Noise level Onboard Ships
- 1 Extent of engagement
Sound pressure level measurements onboard Ship.
- 2 Supervisor
The supervisor shall have a minimum of 2 years of experience as an operator in sound pressure level measurements.
- 3 Operators
The operator is to have the following qualifications:
• Knowledge in the field of noise, sound measurements and handling of measurement
equipment
• Adequate knowledge of the applicable international requirements (SOLAS Regulation
II-1/3-12, as amended, and IMO Code on noise levels onboard Ships, as amended,)
• At least 1 year’s experience, including participation in a minimum of 5 measurement
campaigns as an assistant operator
• Training concerning the procedures specified in IMO Code on Noise Levels onboard
Ships
• Be able to document theoretical and practical training onboard in using a sound level
meter
- 4 Equipment
- 4.1 Sound level meters
Measurement of sound pressure levels shall be carried out using precision integrating sound level meters. Such meters shall be manufactured to IEC 61672-1(2002-05)1, as amended, type/class1 standard as applicable, or to an equivalent standard acceptable to the Administration2.
1 Recommendation for sound level meters. 2 Sound level meters class/type 1 manufactured according to IEC 651/IEC 804 may be
used until 1 July 2016.
- 4.2 Octave filter set
When used alone, or in conjunction with a sound level meter, as appropriate, an octave filter set shall conform to IEC 61260 (1995)3, as amended, or an equivalent standard acceptable to the Administration.
3 Octave-band and fractional-octave-band filters
- 4.3 Sound Calibrator
Sound calibrators shall comply with the standard IEC 60942 (2003-01), as amended, and shall be approved by the manufacturer of the sound level meter used.
Z17
Page 33 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont) 14.4.4 Calibration
Sound Calibrator and sound level meter shall be verified at least every two years by a national Standard laboratory or a competent laboratory accredited according to ISO 17025 (2005), as amended. A record with a complete description of the equipment used shall be kept, including a calibration log.
- 4.5 Microphone wind screen
A microphone wind screen shall be used when taking readings outside, e.g. on navigating bridge wings or on deck, and below deck where there is any substantial air movement. The wind screen should not affect the measurement level of similar sounds by more than 0.5 dB(A) in "no wind" conditions.
- 5 Procedures and instructions
- 5.1 The supplier shall have documented procedures and instructions to carry out service
of the equipment.
Documented work procedures are at least to contain information on inspection preparation, selection and identification of sound level measurement locations, calibration checks and report preparation.
- 5.2 The supplier shall have access to the following documents:
SOLAS 1988, as amended (Reg.II-1/3-12)
Resolution A.468(XII) and IMO Resolution MSC.337(91) code on noise levels on board
ships
Resolution A.343(IX) Recommendation on methods of measuring noise levels at listening posts
The Society’s Rules and Guidelines 14.6 Reporting
A noise inspection report shall be made for each ship. The report shall comprise information on the noise levels in the various spaces on board. The report shall show the reading at each specified measuring point. The points shall be marked on a general arrangement plan, or on accommodation drawings attached to the report, or shall otherwise be identified. The format for noise inspection reports is set out in appendix 1 of IMO Code on Noise Levels onboard Ships and may conform to any other specific requirement of the society (refer to IMO circular MSC.337(91)).
- 7 Verification
The supplier must have the Surveyor’s verification of each separate job, documented in the report by his signature.
Z17
Page 34 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont)
- Firms engaged in tightness testing of primary and secondary barriers of gas
carriers with membrane cargo containment systems for vessels in service
- 1 Extent of engagement
Firms carrying out the following:
• Global Vacuum Testing of Primary and Secondary Barriers
• Acoustic Emission (AE) Testing
• Thermographic Testing
- 2 Requirements for firms engaged in global testing of primary and secondary barriers
- 2.1 Testing Procedures – Testing is to be carried out in accordance with cargo
containment system designer’s procedures as approved by the society.
- 2.2 Authorization - The supplier is to be authorized by the system designer to carry out the
testing.
- 2.3 Equipment – Equipment is to be maintained and calibrated in accordance with
recognized national or international industrial standards.
- 2.4 Reporting – The report is to contain the following:
• Date of testing
• Identity of test personnel
• Vacuum decay data for each tank
• Summary of test results
- 3 Requirements for firms engaged in acoustic emission (AE) testing
- 3.1 Testing procedures – The supplier is to have documented procedures based upon
recognized national or international industrial standards to perform ultrasonic leak test using AE sensors for the secondary barrier of membrane cargo containment systems. The procedures are to include details of personnel responsibilities and qualification, instrumentation, test preparation, test method, signal processing, evaluation and reporting.
Note: The differential pressure during testing should not exceed the containment system designer’s limitations.
- 3.2 Supervisor – The responsible supervisor shall be certified to a recognized national or
international industrial standard (e.g. Level II, ISO-9712 as amended or SNT-TC-1A as amended) and have one year experience at Level II.
- 3.3 Operators – The operators carrying out the acoustic emission (AE) testing shall be
certified to a recognized national or international industrial standard (e.g. Level I, ISO-9712 as amended or SNT-TC-1A as amended) and shall have adequate knowledge of ship structures sufficient to determine sensor placement.
Z17
Page 35 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont) 15.3.4 Equipment – Equipment is to be maintained and calibrated in accordance with recognized national or international industrial standards or equipment manufacturer’s recommendations.
- 3.5 Evaluation of acoustic emission (AE) testing – Must be carried out by the supervisor or
individuals certified to a recognized national or international industrial standard (e.g. Level II, ISO-9712 as amended or SNT-TC-1A as amended) and have one year experience at Level II.
- 3.6 Reporting – The report is to contain the following:
• Date of testing
• Supervisor and operator(s) certifications
• Description of time and pressure of each cycle of test
• List and sketch detailing location of possible defects
- 4 Requirements for firms engaged in thermographic testing
- 4.1 Testing Procedures – Testing is to be carried out in accordance with the cargo
containment system designer’s procedures as approved by the society.
- 4.2 Authorization - The supplier is to be authorized by the system designer to carry out the
testing.
- 4.3 Supervisor – The responsible supervisor shall be certified to a recognised national or
international industrial standard (e.g. Level II, ISO-9712 as amended or SNT-TC-1A as amended) with additional certification in infrared/thermal testing. Certification by the supplier is not allowed and must be obtained through an independent certification body. SNT-TC-1A certified personnel must provide evidence that training on Level II or above has been administered by an independent training body centrally certified to ASNT or a comparable nationally recognized certification scheme.
- 4.4 Operators – The operators carrying out the imaging shall be certified to a recognized
national or international industrial standard (e.g. Level I, ISO-9712 as amended or SNT-TC- 1A as amended) with additional certification in infrared/thermal testing and shall have adequate knowledge of ship structures sufficient to determine position for each identified image, and of the containment system to understand the basis of the testing. Certification by the supplier is not allowed and must be obtained through an independent certification body. SNT-TC-1A certified personnel must provide evidence that training on Level I or above has been administered by an independent training body centrally certified to ASNT or a comparable nationally recognized certification scheme.
- 4.5 Equipment – Thermal cameras and sensors are to be in accordance with the system
designer’s procedures with regards to sensitivity, accuracy and resolution.
Equipment are to be in accordance with recognized standard (IEC, etc.) with regards their safety characteristics for the use in hazardous areas (in gas explosive atmosphere), maintained and calibrated in accordance with the maker’s recommendations.
- 4.6 Evaluation of thermographic images – Must be carried out by the supervisor or
individuals certified to a recognized national or international industrial standard (e.g. Level II, ISO-9712 as amended or SNT-TC-1A as amended) with additional certification in
Z17
Page 36 of 36 IACS Req. 1997/Rev.12 2016 Z17 (cont) infrared/thermal testing. Certification by the supplier is not allowed and must be obtained through an independent certification body. SNT-TC-1A certified personnel must provide evidence that training on Level II or above has been administered by an independent training body centrally certified to ASNT or a comparable nationally recognized certification scheme.
- 4.7 Reporting – The report is to contain the following:
• Date of testing
• Supervisor and operator(s) certifications
• Differential pressures of all phases
• List and sketch detailing location of thermal indications
• Thermographic images of all phases of testing for thermal indications
• Evaluation of thermal images indicating possible leaks
End of Document
Annex E MCA Safety Bulletin No. 12
Page 1 of 2 SAFETY BULLETIN NO. 12
Date of issue: September 2018
SAFETY BULLETIN 12 - Accidental CO2 releases onboard 2 UK Merchant Vessels The Issue The Maritime & Coastguard Agency is aware of two serious and potentially near fatal accidental CO2 releases on UK ships in the last two years. In both cases the CO2 leaked from the manifold into the CO2 room. In both cases the remote release valves were untouched and the CO2 alarms operated, alerting the crew and averting fatalities. However, these incidents follow a concerning pattern of similar incidents. The MCA would like to remind operators that CO2 is highly asphyxiating, a 9% concentration causes unconsciousness within minutes and 17% causing death within just a couple of minutes. CO2 is also both colourless and odourless. Key findings of a recent MAIB investigation: • Many systems are designed such that a single leaking valve can discharge the entire system. • Lack of clarity on life/service intervals and maintenance requirements of cylinder valves. • There is perceived over reliance on shore-based contractors who may have poor knowledge of the specific system fitted onboard. • CO2 leaked from the systems and was not contained by the pipework and manifold.
Image - Common arrangement of pilot bottles connected to system with flexible pipes Some key areas that should be highlighted which will reduce the risk of reoccurrence of similar incidents; • When bottles are required to be refilled, it is important that valves should be either serviced or replaced at least in line with manufacturers recommendations. With
Page 2 of 2 regards maintenance of the valves the MCA and MAIB would like to draw the attention of service agents and ships operators to BS EN ISO 22434:2011 - Transportable gas cylinders - Inspection and maintenance of cylinder valves which provides relevant guidance on the issue of maintenance where manufacturers are silent on the issue. • MCA interpretation of MSC.1/Circ.1318 requires that 10% of high pressure CO2 cylinders are hydrostatically tested at their 10 year anniversary. Furthermore, in line with BS EN 1968-2002 – All remaining cylinders must be hydrostatically tested by the 20 year anniversary. • Flexible pipework must be replaced at intervals specified by the manufacturer or at the 10 year anniversary whichever is sooner as per MSC.1/Circ.1318. • The IMO FSS Code, chapter 5.2.1.1.3 requires that crew should be checking quantities of fire extinguishing medium. Given the numbers of bottles involved, methods such as weighing of cylinders are highly impractical. There are now commonly available simple methods such as ultrasonic liquid level gauges which facilitate easy in situ level testing which operators should consider in order that their crews can readily and safely check the levels of CO2 thus enabling early detection of a potential problem. The UK would consider this appropriate as per the IMO FSS Code Chapter 5.2.1.1.3 and this could be built into the planned maintenance system. • The MCA would remind operators of the benefit of marking the cylinders and checking CO2 levels at least annually. • The MCA would also recommend that operators test and ensure the correct operation of any pressure switches and alarms within their systems.
Further information
For further information please contact marinetechnology@mcga.gov.uk or phone on +44 2038 172000
FD06059 | 2019_英国_explosion-and-fire-on-chemical-tanker-stolt-groenland__InterimReport201912-StoltGroenland.pdf
分类:06_境外及港澳台调查报告 | 年份:2019 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
M A R I N E A C C I D E N T I N V E S T I G AT I O N B R A N C H INTERIM REPORT SERIOUS MARINE CASUALTY December 2019 1 Interim report on the investigation of the explosion and fire on board the chemical tanker Stolt Groenland on 28 September 2019, Ulsan, Republic of Korea The information contained in this interim report is based on investigations to date. Readers are cautioned that there is the possibility new evidence may become available that might alter the circumstances as depicted in this report. Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of a safety investigation into an accident under these Regulations shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of such an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2019 See http://www. nationalarchives.gov.uk/doc/ open-government-licence for details. All reports can be found on our website: www.gov.uk/maib For all enquiries: Email: maib@dft.gov.uk Tel: 023 8039 5500 Fax: 023 8023 2459
INTERIM REPORT As the full investigation report will not be published within 12 months of the accident date, this interim report is published, pursuant to Regulation 14(2)(b) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012. Stolt Groenland Image courtesy of https://www.fleetmon.com NARRATIVE On 17 August 2019, Stolt Groenland, a Cayman Islands registered chemical/ products tanker operated by Stolt Tankers B.V. sailed from Houston, USA for passage to Kobe, Japan via the Panama Canal. The tanker was carrying 20 different chemical cargoes in 37 of its 39 cargo tanks. After discharging four cargo tanks off Kobe on 23 September and six cargo tanks at the Odfjell Terminal in Ulsan, Republic of Korea, between 26 and 27 September, Stolt Groenland moored alongside the Yeompo Quay in Ulsan. Two further cargo tanks were then discharged via a ship to ship transfer with Stolt Voyager. On completion, Stolt Voyager moored ahead of Stolt Groenland. At about 0600 on 28 September, the Singapore registered chemical/ products tanker Bow Dalian secured alongside Stolt Groenland’s port side. The purging of Bow Dalian’s cargo tanks with nitrogen supplied from shore- side vehicles was then commenced in readiness for a ship-to-ship cargo transfer with Stolt Groenland.
2 At 1043, vapour started to release from the pressure vacuum valve for Stolt Groenland’s number 9 starboard (9S) cargo tank, which contained styrene monomer. About 2 minutes later, a high- level alarm indicated that the level in 9S cargo tank had reached 95%, soon followed by a high-high-level alarm indicating that the level had increased to 98%. By now, Stolt Groenland’s on-watch deck officer and chief officer had made their way to the cargo control room and they saw from the cargo monitoring system that the pressure inside 9S cargo tank was rapidly rising. Suddenly, at 1050, two explosions were seen and heard in rapid succession in way of the tanker’s cargo manifold (Figure 1). The resulting fireball passed very close to a road bridge above the quay (Figure 2). Figure 1: Tank rupture and ignition of released vapour Vapour release from PV valve (9S cargo tank) 9S cargo tank Figure 2: Fireball viewed from the Ulsan bridge
3 Stolt Groenland’s and Bow Dalian’s crews immediately operated and directed foam monitors towards the respective cargo manifolds. Bow Dalian’s cargo manifold drench system was also activated. The fire on board Stolt Groenland was very intense and large plumes of thick black smoke were emitted. Stolt Groenland’s crew evacuated using the free-fall lifeboat at the stern while Bow Dalian’s crew were taken off by Korean Coastguard boats that had arrived at the scene. DAMAGE AND INJURIES The fire was fought from the shore and from the water and lasted until early the following morning. The damage in way of Stolt Groenland’s cargo manifold and accommodation block was extensive (Figure 3). The following persons were injured: Stolt Groenland’s gangway watchkeeper, who was blown over the guardrails by the force of the explosion; a deck rating on board Bow Dalian; and, a number of shore workers, including firefighters and police during the emergency response. STYRENE MONOMER Styrene monomer is used to make plastics, paints and synthetic rubber. It is a colourless to yellowish oily liquid with an aromatic odour and is highly flammable. It has a flash point of 32°C (90°F). It is also toxic and reactive and is generally stable at ambient temperature. Polymerization1 of the monomer is initiated by heat or contact with peroxides. The polymerization process is exothermic and the monomer’s temperature may rise to the point where the reaction becomes very rapid and self-sustaining (runaway polymerization). Normally, temperatures above 65°C (149°F) are needed to initiate runaway polymerizations. To reduce the possibility of polymerization in storage and during transportation, Tert- Butylcatechol (TBC) inhibitor is added to styrene monomer, typically at a concentration of between 10-15ppm, but higher levels might be needed depending on storage conditions and expected voyage duration. The depletion of TBC over time and its effectiveness as an inhibitor are affected by temperature, oxygen levels and water. INVESTIGATION On 28 September, the Maritime Authority of the Cayman Islands requested the MAIB investigate this accident in accordance with the International Maritime Organization Casualty Investigation Code2. During the on-site investigation in Ulsan, the MAIB was assisted by the Korean Maritime Safety Tribunal. In addition, the Singapore Transport Safety Investigation Bureau supported MAIB’s evidence collection on board Bow Dalian, along with the vessel’s owners. Access to Stolt Groenland was controlled by the Korean Coastguard and restricted by the toxicity of the atmosphere on board. MAIB inspectors eventually boarded the tanker on 8 October 2019 with the co-operation and assistance of Stolt Tankers B.V., the vessel’s operator. A further inspection was carried out on 12 November 2019. Stolt Tankers B.V. has provided a copy of the data saved on the tanker’s voyage data recorder capsule. 1 Polymerization is a chemical reaction in which two or more molecules combine to form larger molecules that contain repeating structural units. However, if a large amount of monomer is involved, and if the reaction is strongly exothermic, the monomers may combine too quickly. Consequently, heat and pressure increase. 2 IMO Resolution MSC 255(84)
4 9C cargo tank area Approximate area of tank split (at deck level) 9S cargo tank area Figure 3: Stolt Groenland starboard cargo manifold
5 INITIAL FINDINGS The explosions on board Stolt Groenland were probably caused by the rupture of the deck above 9S cargo tank, followed immediately by the ignition of the styrene monomer vapour that was then released. The rupture was due to over-pressurisation and the likely sources of the ignition were static electricity, sparks or elevated steel deck plate temperatures resulting from the tank rupture. A large hole was found in way of the tank’s common bulkhead with number 9 centre (9C) cargo tank (Figure 4) and its hatch cover had been blown off. No cargo operations or deck maintenance were in progress at the time. VDR data showed that the temperature of the styrene monomer had reached 100ºC at the time of the explosion. Such an elevated temperature indicates that the cargo was polymerizing. Figure 4: 9S tank rupture Polymerized styrene monomer
6 Stolt Groenland had loaded 5,250 tonnes of styrene monomer at the LBC terminal in Houston, U.S.A. between 7 and 8 August. The cargo was distributed between three stainless steel cargo tanks: numbers 9S, 6P and 6C. Prior to loading, the tanks had been washed and inspected and wall wash tests had been conducted; no problems were recorded. The tanks were not purged with nitrogen before loading and none were adjacent to heated cargoes in accordance with cargo loading instructions. The concentration of TBC inhibitor in the styrene monomer in the shore tank was 11.3ppm but this was increased by the addition of 3 US gallons of liquid TBC to each of the destination tanks before loading was commenced. The target concentration of the TBC was 17ppm. The loading was overseen by an American Cargo Assurers cargo surveyor acting on behalf of the supplier of the styrene monomer, Ineos Styrolutions, and the purchaser, Samsung C&T Corporation. The certificate of inhibitor, issued by the cargo surveyor at the time of loading, stated that the TBC should remain effective for between 60 and 90 days. It also stated that the inhibitor was oxygen dependent and that the ideal temperature for the styrene monomer was between 60ºF and 85ºF (15.5ºC – 29.4ºC). Stolt Groenland did not carry additional inhibitor. ACTIONS TAKEN Stolt Tankers B.V. engaged salvors to assist in making Stolt Groenland safe. The discharge of the remaining chemical cargo from the undamaged tanks was completed by Stolt personnel on 29 October 2019. The Ulsan Regional Office of Oceans and Fisheries has prohibited the transport and unloading of some hazardous cargoes, including styrene monomer, at several terminals under the Ulsan bridge. OTHER RECENT INCIDENT On 20 November 2019, the MAIB was informed of an incident on board the Cayman Islands registered chemical/products tanker Stolt Focus in which the temperature of a styrene monomer cargo had steadily increased. Efforts to stabilize the temperature, including the injection of additional inhibitor, were unsuccessful. Following consultation with chemists ashore, the crew distributed the cargo between four cargo tanks and mixed it with sea water, which stabilized the styrene monomer. THE MAIB INVESTIGATION WAY AHEAD The MAIB’s investigation will focus on, among other things:
● the factors contributing to the initiation of the polymerization of the styrene monomer,
● cargo monitoring, and
● the emergency response. The MAIB will continue to work closely with all the stakeholders involved in order to progress the investigation as swiftly as possible and ensure appropriate action can be taken in order to
7 further reduce the likelihood of similar accidents in the future. Once the MAIB’s investigation is complete, a report will be drafted and distributed to key stakeholders for a 30-day consultation period prior to it being published. In the interim, chemical tanker owners/operators are reminded to:
● Adhere to the carriage and storage instructions details on the safety data sheet, the certificate of inhibitor, and those provided by the charterer.
● Witness the addition of inhibitor into each cargo tank.
● Closely monitor cargo temperature for unexplained increases. They should also ensure that their crews are familiar with the action to take in the event of the styrene monomer self-heating/polymerizing. REQUEST FOR INFORMATION The MAIB is seeking any information from ship owners, ship and terminal operators, or individuals regarding any accidents or ‘near-misses’ involving the carriage of styrene monomer on board ships, including any actions subsequently taken. The MAIB’s email address is maib@dft.gov.uk and further contact details are at www.gov.uk/maib.
8 VESSEL DETAILS Vessel’s name Stolt Groenland Flag Cayman Islands Classification society Det Norske Veritas Germanischer Lloyd (DNVGL) IMO number 9414072 Type Chemical/Products Tanker Registered owner Stolt Tankers B.V. Manager Stolt Tankers B.V. Year of build 2009 Construction Steel Length overall 182.72 Gross tonnage 25881 Authorised cargo Chemicals/Products VOYAGE PARTICULARS Port of departure Ulsan, Republic of Korea Port of arrival Ulsan, Republic of Korea Type of voyage International Cargo information 31178 tonnes of chemicals Manning 25 MARINE CASUALTY INFORMATION Date and time 28 September 2019 at 1050 (UTC+9) Type of marine casualty or incident Serious Marine Casualty Location of incident Ulsan, Republic of Korea Place on board Cargo tanks/Deck Injuries/fatalities 1 (Stolt Groenland), 1 (Bow Dalian). 15 shore workers/officials were also reported to have been injured. Damage/environmental impact Toxic fumes Ship operation Moored alongside Voyage segment Moored alongside External & internal environment Daylight. Air temperature: 24ºC. Wind: light airs Persons on board 25
FD06060 | 2019_英国_safety-warning-about-drivers-remaining-in-vehicle-cabs-while-ferries-are-at-sea_2019-_SB.pdf
分类:06_境外及港澳台调查报告 | 年份:2019 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
Extracts from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 Regulation 5: “The sole objective of a safety investigation into an accident under these Regulations shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of such an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” Regulation 16(1): “The Chief Inspector may at any time make recommendations as to how future accidents may be prevented.” NOTE This bulletin is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2019 See http://www.nationalarchives. gov.uk/doc/open-government- licence for details. All bulletins can be found on our website: https://www.gov.uk/maib For all enquiries: Email: maib@dft.gov.uk Tel: 023 8039 5500 Fax: 023 8023 2459 Press Enquiries: 01932 440015 Out of hours: 020 7944 4292 Public Enquiries: 0300 330 3000 M A R I N E A C C I D E N T I N V E S T I G AT I O N B R A N C H SAFETY BULLETIN SB1/2019 March 2019 Dangers posed to freight vehicle drivers by remaining in their vehicle cabs while on board ro-ro ferries at sea
MAIB SAFETY BULLETIN 1/2019 This document, containing safety lessons, has been produced for marine safety purposes only, based on information available to date. The Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 provide for the Chief Inspector of Marine Accidents to make recommendations at any time during the course of an investigation if, in his opinion, it is necessary or desirable to do so. The Marine Accident Investigation Branch is carrying out an investigation into the cargo shift of freight vehicles on board the ro-ro passenger ferry European Causeway while on passage from Larne to Cairnryan in Scotland. The MAIB will publish a full report on completion of the investigation. Andrew Moll Chief Inspector of Marine Accidents NOTE This bulletin is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall not be admissible in any judicial proceedings whose purpose, or one of whose purposes, is to apportion liability or blame. This bulletin is also available on our website: www.gov.uk/maib Press Enquiries: 01932 440015; Out of hours: 020 7944 4292 Public Enquiries: 0300 330 3000
1 BACKGROUND The MAIB is investigating the shift and toppling over of freight vehicles (Figures 1, 2, 3 and 4) on board the P&O ro-ro passenger ferry European Causeway during heavy weather while on passage from Larne, Northern Ireland, to Cairnryan, Scotland. In accordance with international regulations and industry best practice, P&O does not permit passengers to remain on the ro-ro decks when at sea. INITIAL FINDINGS On 18 December 2018, European Causeway was on passage from Larne to Cairnryan when it encountered very strong winds and very rough seas, which caused the ship to roll heavily. As a result, 9 of the 40 freight vehicles on board toppled over, with several vehicles sustaining damage. The MAIB investigation has found that at least six drivers had remained in their freight vehicle cabs during the crossing despite being instructed by the ship’s crew to vacate the ro-ro deck after they had parked their vehicles. Figure 1: Trucks on upper deck aft Figure 2: Truck toppled over Figure 3: Truck toppled over on main deck
2 Four drivers were found in the freight vehicles that had toppled over, with one remaining trapped until he could be freed by the emergency services that were waiting in Cairnryan. Fortunately, nobody was hurt during the accident. The investigation has uncovered that the problem of drivers remaining in their vehicle cabs on the ro-ro deck while ferries are on passage is not unique to this route or to P&O. SAFETY LESSONS A ferry’s ro-ro deck is a hazardous and potentially life-threatening environment. While a ferry is at sea, the ro-ro decks should be occupied by only trained professional seafarers who are required to undertake safety and security patrols. Drivers who remain on the vehicle deck of ro-ro ferries pose a danger to themselves, and can cause a delay to the emergency response, particularly in the event of a fire. Any delay to the activation of fire suppression systems on the vehicle deck due to the need to undertake a muster and headcount of all persons on board could have catastrophic consequences to the whole vessel, its passengers and the environment. Furthermore, drivers who have remained in their vehicle cabs could be in danger of asphyxiation by the fire, or as a result of the fire suppression systems that may be released by ship’s staff. ACTIONS TAKEN P&O Ferries has contacted ferry operators in the United Kingdom who it considers may be affected by the issue of drivers remaining in vehicle cabs on ro-ro decks. Its aim is to encourage operators to contribute to a discussion forum to collectively eliminate this problem. All companies operating ferries to the United Kingdom are strongly encouraged to engage positively with this safety initiative, to work across the industry to develop a cohesive and co- operative approach to resolve this urgent safety issue. RECOMMENDATION The Road Haulage Association Ltd is recommended to: S2019/106 Distribute this Safety Bulletin to its members and encourage them to take robust action to improve and assure driver safety by helping ferry operators eliminate the issue of drivers remaining in the cabs of freight vehicles on ro-ro decks. Safety recommendations shall in no case create a presumption of blame or liability Figure 4: Damaged truck and mini bus
FD06061 | 2019_英国_two-catastrophic-engine-failures-one-resulting-in-a-fire-on-board-ro-ro-passenger-ferry-wight-sky__2019-InterimReport-WightSky.pdf.pdf
分类:06_境外及港澳台调查报告 | 年份:2019 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
M A R I N E A C C I D E N T I N V E S T I G AT I O N B R A N C H SERIOUS MARINE CASUALTY May 2019 1 Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of a safety investigation into an accident under these Regulations shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of such an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2019 See http://www. nationalarchives.gov.uk/doc/ open-government-licence for details. All reports can be found on our website: www.gov.uk/maib For all enquiries: Email: maib@dft.gov.uk Tel: 023 8039 5500 Fax: 023 8023 2459 As the full investigation report will not be published within 12 months of the accident date, this interim report is published, pursuant to Regulation 14(2)(b) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012. INTERIM REPORT Interim report on the investigation into two catastrophic engine failures on board the ro-ro passenger ferry Wight Sky on 26 August 2018 and 14 December 2018 BACKGROUND The UK registered roll-on roll-off passenger ferry Wight Sky (Figure 1) was one of three W-Class sister vessels operated between Lymington, Hampshire, and Yarmouth, Isle of Wight, by Wightlink Ltd since 2008. It was propelled and steered by two five-blade Voith Schneider units, one forward and one aft. Depending on the power required, each propulsion unit could be driven by one or two Volvo Penta D16 six-cylinder diesel engines. Two main engines (ME), ME1 and ME2, were located in the forward engine room, with ME3 and ME4 in the aft engine room. On 12 September 2017, Wight Sky’s ME2 suffered a catastrophic failure during the vessel’s approach to Yarmouth, which resulted in an engine room fire and caused serious injuries to an engineering officer. The engine had recently been overhauled ashore by an independent local Volvo Penta dealer, following which it was rebuilt in the engine room on board the vessel. It had been running for less than 6 hours when it failed. Volvo Penta’s investigation concluded that the lubrication supply to a big- end bearing had probably been blocked by debris that had been allowed to enter the engine’s oil channels during the rebuild. The information contained in this interim report is based on investigations to date. Readers are cautioned that there is the possibility new evidence may become available that might alter the circumstances as depicted in this report. Figure 1: Wight Sky Photo by user:geni, CC BY-SA 4.0, https://commons.wikimedia.org/w/index.php?curid=47612090
2 The accident was investigated by the MAIB and the investigation report 1 concluded that ‘Rebuilding the engine in a clean and controlled environment and transferring it complete into the engine room would have reduced the likelihood of debris ingress.’ Subsequently fully assembled engines were shipped in/out of the W-Class via the designated route. NARRATIVE On 26 August 2018, Wight Sky’s replacement ME2 catastrophically failed (Figure 2) as the vessel was preparing to enter the Lymington river. One of the engine’s connecting rods (Figure 3) and various other internal engine components were ejected through the engine block. The engine lubricating oil ignited, causing a fireball to engulf the engine (Figure 4). The engine room was unmanned at the time. The bridge team were immediately alerted to the situation by the activation of alarms on the engine alarm monitor and could see flames and smoke in the forward engine room via CCTV, and they swiftly activated the fixed fire-fighting water-mist system. This action quickly contained, and then extinguished the fire. Following discussions with the coastguard, the vessel’s master returned Wight Sky to Yarmouth and disembarked the passengers. There were no injuries. The engine that failed had accumulated 2241 running hours since its installation. It was a new build engine that had been delivered from Volvo Penta’s factory in Sweden and installed by the local Volvo Penta dealer. Initially, the failure appeared to be identical to the previous one and the MAIB began a new investigation. 1 MAIB report No 14/2018 - Catastrophic engine failure, resulting in a fire and serious injuries to the engineer on board Wight Sky, off Yarmouth, 12 September 2017. Ignition of engine oil after crankcase breached Figure 2: Catastrophic failure of Wight Sky's replacement ME2 on 26 August 2018 (various pieces of engine debris circled)
3 Figure 3: Failed connecting rod Figure 4: Engine engulfed by flame from ignition of hot engine oil
4 On 14 December 2018, Wight Sky’s ME4 suffered a catastrophic failure as the vessel was closing on the berth at Lymington. The engine was also new, having run for only 380 hours. Again, a connecting rod bottom-end failed, and various internal engine components were ejected through the engine block. There was no fire, but the fixed fire-fighting system was operated immediately as a precaution. There were no injuries and the vessel berthed safely. INVESTIGATION The MAIB is working closely with Wightlink Ltd, Volvo Penta, the local Volvo Penta dealer, Lloyd’s Register (Wight Sky’s Classification Society) and the Maritime and Coastguard Agency to investigate the two latest engine failures. Due to the apparent similarities between the failure of ME4 and the previous failures of ME2, the MAIB investigation findings will be set out in a combined report. The technical investigation team identified two other recent non-catastrophic engine failures that occurred on board Wight Sky’s sister vessel, Wight Light, and included them in the scope of the investigation. One of the Wight Light engines suffered a crankshaft main bearing failure on 2 February 2018, the other a melted piston and partial seizure on 3 August 2018. The engines were sent to Volvo Penta’s facility in Gothenburg for dismantling and examination (Figure 5) to determine the cause of failure. The initial examination of Wight Sky’s ME2 that failed on 26 August 2018 did not identify any obvious cause of failure, and it was brought back to the UK for metallurgical examination. In addition to seeking to identify the direct causes and mechanisms of the engine failures, the investigation has also focused on other factors that might have contributed to the series of failures. These include, inter alia, vessel and system operating parameters; propulsion system alignment and design; and maintenance management. The investigation team has also re-examined the Wight Sky engine that failed on 12 September 2017 and reviewed the investigation of an identical engine that suffered a similar failure on board a windfarm vessel in September 2017 2. 2 Report No 1/2018 - Catastrophic engine failure resulting in a fire on crew transfer vessel Windcat 8, 7 September 2017. Figure 5: Removed engine after delivery to Volvo Penta's factory in Gothenburg
5 INITIAL FINDINGS The investigation into the series of Volvo Penta D-16 engine failures experienced on board Wightlink’s Yarmouth to Lymington ferries, and Wight Sky in particular, is technically complex and is ongoing. The initial findings support the conclusions made in MAIB report No.14/2018 with respect to the first Wight Sky ME2 engine failure, and have identified direct causes for two of the other four engine failures: • Wight Sky’s newly built ME4 suffered a catastrophic failure after 380 running hours because of an assembly error during build in the Volvo Penta factory. • Wight Light’s ME1 seized because of an assembly error during overhaul conducted by the local Volvo Penta dealer. Although direct causes have not been established for all five engines, the investigation has identified several underlying factors that might have contributed to this unusually high incidence of failures. These include the way the vessels and their engines are driven during entry to and departure from port; the set- up of the engines’ auxiliary systems; the management of maintenance on board and ashore; quality control during engine assembly and overhaul. ACTIONS TAKEN Following the failure of Wight Sky's main engine (ME4) in December 2018, Wightlink immediately withdrew its W-class vessels from service. After discussions between Wightlink, the MCA, Lloyd’s Register, and Volvo Penta, a mitigation plan was put in place to enable the vessels to return to service. The initial mitigation measures included weather and engine load constraints, enhanced engine monitoring and shutdown procedures, and restrictions on personnel entering the machinery spaces when the main engines were running. Further precautionary steps have also been taken as the technical investigation has progressed, including: shorter periods between routine fuel injector overhauls; modifications to the engine alarm system; replacement of flexible engine mounts; reduction of oil replacement and oil sampling hours; and testing of engine coolant. Following the discovery of the assembly error Volvo Penta has strengthened its standard operation process to prevent this from occurring again. Volvo Penta confirmed the same error had not been repeated on engines manufactured around the same time. THE MAIB INVESTIGATION WAY AHEAD The MAIB will continue to work closely with all the stakeholders involved in order to progress the investigation as swiftly as possible and ensure appropriate action can be taken in order to further reduce the likelihood of similar accidents in the future. Once the MAIB’s investigation is complete, a report will be drafted and distributed to key stakeholders for a 30-day consultation period prior to it being published.
6 SHIP PARTICULARS Vessel’s name Wight Sky Flag United Kingdom Classification society Lloyd’s Register IMO number/fishing numbers 9446984 Type Ro-ro passenger ferry Registered owner Wightlink Limited Manager Wightlink Limited Year of build 2008 Construction Steel Length overall 62.40m Gross tonnage 2546 tonnes Authorised cargo Passengers, private and commercial vehicles VOYAGE PARTICULARS Port of departure Yarmouth, Isle of Wight Yarmouth, Isle of Wight Port of arrival Lymington, Hampshire Lymington, Hampshire Type of voyage Internal waters Internal waters Cargo information 117 passengers, 29 cars, 1 lorry, 3 vans 43 passengers, 17 vehicles Manning 10 9 MARINE CASUALTY INFORMATION Date and time 26 August 2018, 1835 14 December 2018, 0655 Type of marine casualty or incident Serious Marine Casualty Serious Marine Casualty Location of incident 50° 44’ 41N 1˚ 30’ 42W 50m from Lymington ferry berth Place on board Forward engine room Aft engine room Injuries/fatalities None None Damage/environmental impact No.2 main engine damaged beyond repair No.4 main engine damaged beyond repair Ship operation Commercial voyage Commercial voyage Voyage segment Mid-water Arrival External & internal environment Near gale; slight sea; moderate visibility Gentle breeze; calm sea; good visibility Persons on board 127 52
FD06062 | 2020_英国_collision-between-2-fire-and-rescue-service-boats-with-loss-of-1-life__2020-17-FRSRIBs.pdf
分类:06_境外及港澳台调查报告 | 年份:2020 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
ACCIDENT REPORT ACCIDENT REPORT Report on the investigation of the collision between two fire and rescue service boats resulting in one fatality River Cleddau, Milford Haven, Wales 17 September 2019 VERY SERIOUS MARINE CASUALTY REPORT NO 17/2020 NOVEMBER 2020
The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be in admissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2020 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. All MAIB publications can be found on our website: www.gov.uk/maib For all enquiries: Marine Accident Investigation Branch First Floor, Spring Place 105 Commercial Road Southampton United Kingdom SO15 1GH Email: maib@dft.gov.uk Telephone: +44 (0) 23 8039 5500 Fax: +44 (0) 23 8023 2459 Press enquiries during office hours: 01932 440015 Press enquiries out of hours: 020 7944 4292
CONTENTS GLOSSARY OF ABBREVIATIONS AND ACRONYMS SYNOPSIS 1 SECTION 1 - FACTUAL INFORMATION 2 1.1 Particulars of N207 and Rescue 1 and accident 2 1.2 Background 3 1.3 Environmental conditions 4 1.4 Narrative 4 1.5 Emergency response 9 1.6 Boats’ crews 9 1.6.1 N207 9 1.6.2 Rescue 1 10 1.7 Mid and West Wales Fire and Rescue Service 10 1.7.1 Overview 10 1.7.2 N207 10 1.7.3 Rescue 1 11 1.7.4 Boat procedures 13 1.7.5 Risk assessments 14 1.7.6 Control of the activity 14 1.7.7 Training and familiarisation 15 1.7.8 Audit, inspection and peer review 17 1.8 Regulation and oversight of FRS boat operations 18 1.8.1 Overview 18 1.8.2 National Fire Chief’s Council 19 1.8.3 Regulations for boat operations 19 1.8.4 Other boat operating codes 19 1.9 Port Authority 20 1.10 Previous/similar accidents 20 1.10.1 Collision between two RIBs Osprey and Osprey II (MAIB Report
No 10/2017) 20 1.10.2 Two Cardiff Bay Yacht Club RIBs (MAIB Report No 19/2011) 21 SECTION 2 - ANALYSIS 22 2.1 Aim 22 2.2 Overview 22 2.3 The collision 22 2.3.1 Rescue 1 22 2.3.2 N207 23 2.4 Lookout 23 2.5 Planning and control of the training and familiarisation evolutions 23 2.6 Qualifications, crewing and training 24 2.6.1 Overview 24 2.6.2 Training 24 2.6.3 Management oversight of training and certification 25
- 7 Procedures
25 2.7.1 Personal protective equipment 25 2.7.2 Suitability of procedures and risk assessments 25 2.8 Boat operating codes and guidance 26 SECTION 3 - CONCLUSIONS 28 3.1 Safety issues directly contributing to the accident that have been addressed or resulted in recommendations 28 3.2 Safety issues not directly contributing to the accident that have been addressed or resulted in recommendations 29 SECTION 4 - ACTION TAKEN 30 4.1 Actions taken by other organisations 30 SECTION 5 - RECOMMENDATIONS 31
FIGURES Figure 1: N207 (Zodiac Milpro FC470) Figure 2: Rescue 1 (Delta 6.4 RIB) Figure 3: Milford Haven and River Cleddau Figure 4: Location of crew in N207 Figure 5: Tracks of boats before collision Figure 6: Manoeuvring leading to the collision Figure 7: Console arrangement of Rescue 1 Figure 8: Windscreen of Rescue 1 Figure 9: Training matrix Figure 10: Location of Caldey Island ANNEXES Annex A: Extracts from Standard Operating Procedure 2.08 - Flooding Annex B: Extracts from Standard Operating Procedure 2.10 - Rescues; Working Near, On, Or In Water Annex C: Extracts from Appliance, Equipment, Technical Instruction for: Fire Service Boats 5.17 Annex D: Health and Safety Procedural Guidance Document 5.19 - Risk Assessment Annex E: Milford Haven Port Authority - Leisure Guide
GLOSSARY OF ABBREVIATIONS AND ACRONYMS
AET
Appliance, Equipment, Technical instruction for fire service boats AWOA
All Wales Operational Assurance
DEFRA
Department for Environment Food and Rural Affairs FRCO
Flood Rescue Concept of Operations FRS
Fire and Rescue Service GMDSS
Global Maritime Distress and Safety System hp
horsepower kts
knots (nautical miles per hour) m
metres MCA
Maritime and Coastguard Agency MGN
Marine guidance note MHPA
Milford Haven Port Authority MWWFRS
Mid and West Wales Fire and Rescue Service NFCC
National Fire Chief’s Council RBO
Rescue Boat Operator
RIB
Rigid Inflatable Boat
RYA
Royal Yachting Association SRT
Swift Water and Flood Rescue Technician WRBO
Water Rescue Boat Operator VHF
Very High Frequency TIMES: all times used in this report are UTC + 1 unless otherwise stated.
1 SYNOPSIS At about 1125 on 17 September 2019, two fire and rescue service boats - a 4.7m Zodiac Milpro inflatable boat and a 6.4m Delta rigid inflatable boat - were in collision while undertaking boat training and familiarisation on the River Cleddau near Milford Haven, Wales. The collision resulted in one of the firefighters who was taking part in the training on board the Zodiac, being struck by the Delta RIB and sustaining fatal injuries. The collision occurred because both boats were operating at speed and carrying out un-coordinated manoeuvres in the same stretch of the river. The Delta RIB’s helmsman attempted to pass between the Zodiac and the shoreline as his boat exited a large turn made at speed. The Zodiac’s helmsman, initially unaware of the Delta RIB approaching, turned his boat sharply to port as part of his training manoeuvres, which resulted in the boats heading towards each other. The subsequent action taken by both boats to avoid a collision was unsuccessful. The MAIB investigation found that the accident could have been avoided had the training activities been properly planned. Furthermore:
●No-one was in overall charge of the training and familiarisation activities, so they were not properly managed, briefed or communicated between the crews of both boats. ● The operation of the boats did not adhere to the requirements of the local standard operating procedures or risk assessments. ●
●The generic risk assessment for boat operations was inadequate.
●The Fire and Rescue Services in the United Kingdom did not operate boats to a common standard or code of practice when not employed on flood rescue duties. Mid and West Wales Fire and Rescue Service has undertaken its own internal investigation; has implemented a peer review by two other fire and rescue service authorities for various activities, including boat operations; and has reviewed and updated its standard operating procedures and risk assessments for fire service boats. Mid and West Wales Fire and Rescue Service has been recommended to review the crewing and staff qualification requirements for its boats, implement measures to maintain crew competency as boat helmsman, and improve its auditing process to include its boat operations. The National Fire Chief’s Council has been recommended to adopt a nationwide standard of boat operations for all craft capable of being operated at sea by any fire and rescue service across the United Kingdom.
2 SECTION 1 - FACTUAL INFORMATION 1.1 PARTICULARS OF N207 AND RESCUE 1 AND ACCIDENT SHIP PARTICULARS Vessel’s name N207 Rescue 1 Type Zodiac Milpro FC470 Delta 6.4 Rigid Inflatable Boat Registered owner Mid and West Wales Fire and Rescue Service Mid and West Wales Fire and Rescue Service Manager(s) Milford Haven Fire and Rescue Service Milford Haven Fire and Rescue Service Construction Duratane™ fabric Glass Reinforced Plastic hull, Hypalon tubes Year of build 2017 2001 Length overall 4.7m 6.4m VOYAGE PARTICULARS Port of departure Gelliswick Gelliswick Port of arrival Neyland Neyland Type of voyage Training Familiarisation Cargo information n/a n/a Crewing 3 2 MARINE CASUALTY INFORMATION Date and time 17 September 2019; 1125 Type of marine casualty or incident Very Serious Marine Casualty Location of incident River Cleddau Place on board Forward starboard bow Forward bow Injuries/fatalities One fatality, one minor injury None Damage/environmental impact Superficial damage to boat None Ship operation n/a n/a Voyage segment n/a n/a External & internal environment Lt airs, smooth water, good visibility Persons on board 3 2
3 1.2 BACKGROUND The Mid and West Wales Fire and Rescue Service (MWWFRS) was required by Welsh Assembly legislation to provide a flood rescue service within its operational area. Its Milford Haven fire station had two rescue boats: a 4.7m Zodiac Milpro inflatable boat, callsign N 207 (N207) (Figure 1), which was used principally for flood rescue; and a 6.4m Delta rigid inflatable boat (RIB), callsign Rescue 1 (Rescue 1) (Figure 2), which was used primarily to assist firefighters in the event of an emergency at the local oil and gas terminal jetties. On the evening of 16 September 2019, a hazardous material spillage de-contamination exercise, planned for the following day at the Milford Haven fire station, was cancelled. The 10 firefighters scheduled to undertake the exercise discussed alternative training options and agreed to assemble at the station and take the boats out for boat handling practice and flood rescue training. This decision was made because two of the firefighters were due to travel to North Wales 2 days later to complete Water Rescue Boat Operator (WRBO) training on the Menai Strait using boats identical to N207. Figure 1: N207 (Zodiac Milpro FC470) The 4.7m Zodiac Milpro inflatable boat, call sign N 207 Figure 2: Rescue 1 (Delta 6.4 RIB) The 6.4m Delta rigid inflatable boat (RIB), callsign Rescue 1
4 1.3 ENVIRONMENTAL CONDITIONS The wind was variable in direction and had a strength of force 1 to 2. It was a sunny day with very few clouds. The temperature was about 19°C and the visibility was excellent. High water at Neyland was at 0828 with a height of 6.72m, and low water was at 1430 with a height of 1.10m. 1.4 NARRATIVE At about 0800 on 17 September 2019, the 10 firefighters assembled at Milford Haven fire station and were split into two teams of five. One team was chosen to go out in the boats during the morning while the other manned the fire station. The plan was to swap the teams at lunchtime. At about 0830, following a short discussion, the morning boat team was split into two groups. One of the firefighters was also a WRBO instructor (hereafter referred to as the trainer) and he and the two WRBO trainees were assigned to N207. The two remaining firefighters, each of whom held the rank of crew manager, were assigned to Rescue 1. N207 was made ready at the fire station, then towed down to a launch site at Gelliswick (Figure 3). When they arrived, the three firefighters donned their dry-suits, boots and Palm Rescue 800 buoyancy aids. The boat was equipped with Nitro XT water safety helmets, but they were not worn by the crew. At 0938, the firefighters launched and boarded N207. One of the firefighters secured the engine kill-cord to his wrist and took the helm; the trainer positioned himself in the middle of the boat and the other firefighter sat in the bow. In the meantime, the towing vehicle and trailer returned to the fire station to collect Rescue 1. At about 0945, N207 left Gelliswick and was steered eastwards through the Milford Haven waterway and toward the Cleddau bridge. While en route the trainer pointed out different types of buoyage to the firefighters, discussed tides, and talked about his plans for the morning. At the bridge, the trainer asked the firefighters to practise some swift water boat manoeuvres. However, the flow of the ebbing tide at the bridge was insufficient to practise some intended rope and engine work, so they moved the boat a short distance upstream to an old fish farm structure on the south shore where the tide was ebbing with more strength. The firefighters then swapped places and the second firefighter took over the helm. At 1050, Rescue 1 was launched with the two crew managers on board. Each was wearing a dry-suit, boots and Crewsaver Offshore 290N inflatable lifejacket. Rescue 1 was equipped with Geko open face marine safety helmets, but they were not worn by either crew member. The helmsman positioned himself on the port side of the boat behind the steering wheel, and secured the engine kill-cord to his lifejacket. The other crew manager, who was seated on the starboard side next to the helmsman, assumed the role of crewman and used a hand-held VHF radio to inform the local coastguard that Rescue 1 was on the water. He also explained that they would be engaged in training activities in the eastern part of Milford Haven waterway and in the River Cleddau. Rescue 1’s helmsman steered the RIB eastwards, under the Cleddau bridge, and met up with N207 at the disused fish farm structure. During a shouted discussion between the two boat crews it was agreed that each would make their way independently upstream, practising operating the boats at high speed, and rendezvous again at Mill Bay on the south shore (Figure 3).
5 Figure 3: Milford Haven and River Cleddau Google Earth satellite image of Milford Haven and River Cleddau area Image courtesy of Google Earth
6 As there were no speed restrictions in that part of the river, both helmsmen proceeded ahead at, or close to, their boat’s full speed. Rescue 1, which was travelling at a speed of about 28kts, arrived at Mill Bay ahead of N207, which was being driven at its full speed of 16kts. By about 1115, both boats had arrived at Mill Bay and were rafted together, drifting about 20m from the south shore and pointing upstream. As they drifted, the crews discussed the local topography, the nature of the riverbed and local depths of water. During the conversation they agreed to proceed further upstream to the area of Lawrenny and rendezvous again there. Note: The accounts of the witnesses with regard to the events after the boats left Mill Bay are not wholly consistent, and this section of the narrative is based upon the investigator's understanding of the most likely sequence of events. Shortly after 1120, the two boats parted, with Rescue 1 proceeding ahead and accelerating to about half full speed. Meanwhile, N207 proceeded upstream at variable speeds, with its helmsman sitting on the starboard side of the boat practising manoeuvres that involved large course alterations. N207’s trainer was sitting in the middle of the boat with his back against the port side tube, facing to starboard. The other firefighter, Josh Gardener, was sitting in the bow on the port side (Figure 4). Once ahead and clear of N207, Rescue 1’s helmsman commenced a large full-circle turn of the boat to port (Figure 5a). As the boat neared the end of its final turn to port travelling at about 15kts, the helmsman saw N207 ahead of him in the distance, slightly to port, and noted that it now appeared to be headed downstream towards Mill Bay (Figure 5b). He decided to pass between N207 and the shoreline. As Rescue 1 came out of its turn, the helmsman’s attention was briefly taken away from N207 and was split between operating the steering in front of him, checking the engine gauges, and controlling the throttles. Figure 4: Location of crew in N207 For illustrative purposes only: not to scale
7 Figure 5: Tracks of boats before collision Illustati on showing Rescue 1 ah ead and clear of N207 and commencing a full-circle turn to port Illustrat ion to show N207 ahead of Rescue 1 in the distance, turning to port and heading downstream Rescue 1 N207 5a 5b Rescue 1 N207 For illustrative purposes only: not to scale
8 After turning N207 to port and now headed downriver, the helmsman saw Rescue 1 closing rapidly in front of him. In an attempt to avoid crossing ahead of it, he pulled the outboard motor tiller sharply towards him to turn the boat further to port. The trainer saw that Rescue 1 was fast approaching, and realised that they were on a collision course. He shouted a warning to the helmsman and pointed at Rescue 1. When Rescue 1’s helmsman looked ahead, he saw N207 close in front of him and attempted to avoid a collision by increasing speed and turning full helm to starboard (Figure 6). At about 1125, despite the attempts of both helmsmen, the two boats collided. Figure 6: Manoeuvring leading to the collision Illustati on showing tracks of t he boats before the collision with an inset showing the angle of impact 6a: Collision For illustrative purposes only: not to scale Tracks of the boats before the collision
9 Rescue 1’s bow struck N207 in the middle of the boat at an angle of about 45° and rode over its buoyancy tube toward its bow (Figure 6a). Rescue 1’s helmsman pulled his kill-cord, which stopped the boat’s engines. The force of the impact threw N207’s helmsman forward, which pulled out his kill-cord and stopped the boat’s engine. The firefighter in the bow of N207 was knocked or thrown into the water. He was struck on the head during the collision and as the boats separated was seen floating motionless on the water. 1.5 EMERGENCY RESPONSE N207’s trainer immediately jumped into the water to attempt to rescue the casualty, but it quickly became apparent to him, from the severity of the injuries, that the firefighter was dead. Rescue 1 was manoeuvred alongside the casualty in the water, and his body was recovered onto the boat using the onboard casualty recovery equipment. The trainer climbed back into N207 and brought it alongside Rescue 1. He then transferred into the bigger boat with N207’s remaining crewman to assist. At 1127, the crew manager who had been acting as crew on Rescue 1 made a telephone call to the fire station watch manager and told him what had happened. At 1129, he called the emergency services and reported the accident. While the phone calls were being made, N207 was placed under the casualty recovery equipment and secured alongside Rescue 1. The deceased’s body was then lowered into the smaller boat, placed in a body bag, and covered over. Rescue 1 then motored slowly downstream toward Neyland yacht club. At 1145, while on passage downstream, the crewman on board Rescue 1 received a call from the local ambulance service to verify that attempts at resuscitation could not be carried out by the firefighters, and to inform them that they would be met on arrival. At 1155 Rescue 1 arrived at Neyland yacht club pontoon, where they were met by members of the police, ambulance service and fire and rescue service (FRS). The casualty was formally declared deceased by a paramedic from the ambulance service. All crew of the two boats were breathalysed by the police; all recorded a zero-alcohol result. A postmortem external examination carried out by a pathologist a few days later confirmed that the casualty had died as a result of a severe head injury. 1.6 BOATS’ CREWS 1.6.1 N207 Firefighter Josh Gardener had joined the FRS on 10 September 2018. Prior to this, he had worked at sea on small craft operating in offshore windfarms. He had completed the Royal Yachting Association (RYA) powerboat level 2 training in June 2019.
10 The trainer held the rank of firefighter and had worked in the FRS since 1996. He held a RYA advanced powerboat operator certificate that had been commercially endorsed, as well as RYA Day Skipper for Sail and Power Craft, RYA radar operator certificates and GMDSS1 radio operator certificate of competency. He was also qualified to instruct both the RYA powerboat level 2 scheme and the FRS WRBO course, and would periodically act as an instructor at the fire service RYA approved training schools. Several of the trainer's qualifications had been obtained by the trainer at his own expense, including his commercial endorsement. The other crew member of N207 also held the rank of firefighter, and had joined the full-time FRS in January 2019. He had previously worked as a retained part-time firefighter since 2013. He had also completed the RYA powerboat level 2 training in June 2019. 1.6.2 Rescue 1 Both crew on board Rescue 1 were very experienced firefighters and both held the rank of crew manager within the fire service. As designated boat operatives, they had both gained the RYA powerboat level 2 qualification and had completed the WRBO training at Menai. Neither held any other marine qualifications. 1.7 MID AND WEST WALES FIRE AND RESCUE SERVICE 1.7.1 Overview MWWFRS has a legal responsibility under the Fire and Rescue Services Act 2004 to make provision for fire-fighting purposes to protect life and property from fire, and to attend road traffic collisions and other emergencies. In addition, the Fire and Rescue Services (Emergencies) (Wales) (Amendment) Order 2017 introduced a duty requiring MWWFRS to make provision to respond to flooding and inland water emergencies. The Department for Environment, Food and Rural Affairs (DEFRA) produced a Flood Rescue Concept of Operations (FRCO), which set out the processes for managing and maintaining flood rescue capability. DEFRA also controlled the process for the national co-ordination of flood rescue assets in England and Wales. Six Zodiac Milpro FC470 boats were operated by MWWFRS and were identified within the national asset register. Their operation and local procedures followed the DEFRA FRCO requirements. 1.7.2 N207 N207 was one of 16 Zodiac Milpro FC470 inflatable boats purchased by North Wales FRS in October 2017 using a grant from the Welsh Government for flood rescue service. It was one of six boats subsequently transferred to MWWFRS in March 2018 as an equipment upgrade to replace older boats that had come to the end of their service life. The six boats were deployed around the MWWFRS region, with N207 being allocated to Milford Haven. All of the boats were fitted with a long-shaft Mariner 30hp 4-stroke outboard engine with throttle-controlled gearbox, a propeller guard, and were supplied on a trailer. This model of boat was also fitted with speed tubes on the hull underwater, which provided lift and lateral stabilisation, 1 GMDSS – Global Maritime Distress and Safety System
11 thereby reducing drag and improving both stability and manoeuvring capability. This type of boat was referred to as a Swift Water and Flood Rescue Technician (SRT) boat. 1.7.3 Rescue 1 Rescue 1 was a Delta 6.4m RIB that came into service with MWWFRS in 2001 to replace a boat that had come to the end of its service life. It was fitted with twin 90hp two-stroke engines, which were not fitted with propeller guards, and was stored on a trailer at the fire station. The engine throttles and gauges were to the right of the steering wheel in the middle of the console in front of the crew (Figure 7). A large windscreen was mounted on top of the console, which was surrounded by a tubular framework (Figure 8). When standing astride the boat’s jockey seat, the helmsman’s view was not obstructed by the windscreen and framework. However, when standing, the helmsman partially obstructed the seated crewman’s field of view to port. Figure 7: Console arrangement of Rescue 1Rescue 1's console Wheel Throttle Engine gauges
12 Figure 8: Windscreen of Rescue 1Rescue 1's console Windscreen Tubular framework The boat originally had a dual function of providing an operational platform for an FRS dive team, and supporting firefighters working on the oil and gas terminal jetties in the Milford Haven waterway. It could also be used as a transport platform to support an emergency response to local offshore islands. To enable it to operate in areas outside of Milford Haven waterway, Rescue 1 was initially coded to the Maritime and Coastguard Agency (MCA) Merchant Shipping (Small Workboats and Pilot Boats) Regulations 1998. However, shortly after the RIB came into service, the dive team was disbanded. As a result, Rescue 1’s certification of compliance to the code was not renewed at the end of its validity period. MWWFRS completed an analysis to establish the need to maintain Rescue 1 as an operational asset subsequent to the disbanding of the dive team and, at that time, it was decided to keep the RIB in service.
13 1.7.4 Boat procedures The MWWFRS documented management system was available to staff via its ‘@Work’ intranet portal. Within this there were two procedures related to the operation of N207 and Rescue 1, each of which had an associated risk assessment. These were Standard Operating Procedure (SOP):
● SOP 2.8 - Flooding (Extracts at Annex A)
● SOP 2.10 - Rescues; Working Near, On, Or in Water sic. SOP 2.8 was mainly concerned with inland water operations and only made reference to Rescue 1 as an asset: Milford Haven also has a larger boat (Rigid Inflatable Boat) that may be suitable for Large Flooding Incidents. SOP 2.10 stated that: This Standard Operating Procedure (SOP) considers hazards, risks and control measures for fire & rescue service personnel attending incidents involving rescues; working near, on, or in water. It incorporates the Generic Risk Assessment outcomes of MWWFRS Risk Assessment RA(SOP)2.10. [sic] SOP 2.10 made no reference to Rescue 1. The risk assessments for each of these SOPs did not include any reference to the various hazards of working in a boat, or using it as a platform for operations. In addition to the SOPs, MWWFRS produced an ‘Appliance, Equipment, Technical Instruction for Fire Service Boats’ (AET) number 5.17 entitled ‘Appliance, Equipment, Technical Instruction for: Fire Service Boats’ (Extracts at Annex C). This document stated: The Service has a duty to make a suitable and sufficient assessment of the health and safety risks to employees and to provide them with comprehensive and relevant information on the risks identified. The document examines the hazards, risks and control measures relating to fire service personnel using the Fire Service Boats. [sic] Section 2.1 of the document defined the qualifications required by MWWFRS to be held by the crew: SRT Boats SRT boats are crewed by personnel trained and competent to RYA (Royal Yachting Association) Level 2 as a minimum. If operating in swift moving water then the crew must be trained and competent to Rescue Boat Operator (RBO) level as a minimum.
14 RIB The only RIB within the service is based at Milford Haven and the crews will hold the following additional qualifications RYA advanced powerboat certificate (for all helms) Radar course GMDSS (Global Maritime Distress Safety System). [sic] While the trainer in N207 held the qualifications required by MWWFRS within AET 5.17 to operate Rescue 1, neither crew manager in Rescue 1 had the stipulated qualifications required to operate the RIB. 1.7.5 Risk assessments All senior station staff within MWWFRS had undertaken formal training in the development of risk assessments, and station staff were very experienced in undertaking dynamic risk assessments. MWWFRS produced a ‘Health and Safety Procedural Guidance Document 5.19 – Risk Assessment’ (Annex D). This document provided guidance for those carrying out risk assessments, and Appendix B of the document specifically focused on training risk assessment. There were no generic risk assessments for undertaking boat training available via the @Work portal. However, several local risk assessments were made available during the investigation. These were task specific risk assessments for boat training exercises that had been conducted between 2005 and 2015, but none of these had been reviewed and none contained reference to the hazard of boat collision. A risk assessment created in July 2018 entitled ‘Water Rescue Boat Operators Training at Milford Haven Waterway’, specifically covered the majority of activities being undertaken by N207 and Rescue 1 on the day of the accident. However, this document was not available to Milford Haven fire station staff via the @Work portal. An internal review of MWWFRS risk assessments undertaken in August 2018 identified that, of the 119 risk assessments listed in the training section, 88 items (74%) were overdue for review. 1.7.6 Control of the activity Prior to undertaking station-based or off-station training or familiarisation, MWWFRS expected that the person in-charge of the activity would ensure that
● a risk assessment would be carried out for the activity, and
● a safety brief would be undertaken for the activity. At the general morning briefing in Milford Haven fire station on the day of the accident, nobody was identified as being in charge of the water-based activities for that morning’s session. Although an informal dynamic risk assessment was undertaken prior to the boats departing the fire station and launching, no formal
15 documented risk assessment was carried out, no reference was made to SOPs 2.08 and 2.10, or AET 5.17, and no formal safety briefing was carried out that included both boat crews. 1.7.7 Training and familiarisation In common with other FRS authorities around the UK, MWWFRS used pdrPro, a commercially available planner-based maintenance of competence system to record their training activities. This electronic recording system was maintained up-to-date by the individual firefighter and monitored by their line manager. In addition, MWWFRS followed the DEFRA FRCO recommendation for skill sustainability training that: ‘personnel spend a minimum of one day per annum at a suitable swift water training venue, under the supervision and tutorship of appropriately competent trainers’ It was MWWFRS’s policy to undertake an internal annual verification of staff boat operations’ competence using qualified instructors from its own RYA approved and accredited training school. At Milford Haven, the last time that this verification had been undertaken was on 17 July 2017. Milford Haven fire station had an extensive daily training plan for all firefighters to maintain competence in all aspects of their work and core skills (Figure 9). This also included training and familiarisation with N207 and Rescue 1. This boat-specific work was intended to be a combination of time at the fire station and on-water training and familiarisation. The daily plan was necessarily superseded by operational emergency call-outs, but was intended to be sufficiently frequent that MWWFRS training requirements and parameters set within the pdrPro system were met. Firefighters participating in on-water training were not available to respond immediately to emergency call-outs, unlike those undergoing training on land. To enable on-water training and familiarisation with the boats, off duty staff were required to be called in, or cover provided by another station, potentially increasing response time. This made the ability to conduct on-water training and boat familiarisation difficult to achieve, unless the boats were called out for emergency response. In the 12 months prior to the accident, N207 had been called out for emergency response seven times and had undertaken one day of training/familiarisation. In that same 12-month period, Rescue 1 had not been used operationally, but had undertaken 5 days of training/familiarisation. Most of the training/familiarisation had taken place within the Milford Haven waterway, however Rescue 1 had undertaken a training exercise on 21 June 2019 at Caldey Island (Figure 10), and boat familiarisation in August 2019 that had taken it beyond the Milford Haven waterway, and to sea.
16 Figure 9: Training matrixMilford Haven fire station's extensive daily training plan
17 Figure 10: Location of Caldey Island Map location of Caldy Island Caldey Island Image courtesy of Google Earth As part of their WRBO training, firefighters were expected to be able to work with other SRT craft, but not RIBs such as Rescue 1, and it focused on flood rescue scenarios. In the 18 months prior to the accident, N207 and Rescue 1 had been on only one joint training and familiarisation activity, on 10 July 2018, which had taken place in Milford Haven waterway. All full-time firefighters at Milford Haven fire station were required to have completed the RYA powerboat level 2 certificate of competency and the WRBO certificate. There was no evidence found that MWWFRS had provided any additional training since 2004 for firefighters to obtain the RYA advanced powerboat certificate, radar qualifications or GMDSS radio operator required by MWWFRS to operate Rescue 1. This meant that as firefighters had left the service at Milford Haven, the number of firefighters qualified to the MWWFRS required standard to operate Rescue 1, was diminishing. The lack of a sufficient number of firefighters qualified to this higher standard had been raised with MWWFRS regional management several times, most recently by local management at Milford Haven in June 2019. 1.7.8 Audit, inspection and peer review MWWFRS undertook an internal audit of Milford Haven fire station on 9 January 2018 and a station inspection on 29 November 2018. The internal audit used a standard checklist that had not been adapted to include the equipment and training required at the stations operating boats. Omissions included the operation of flood rescue craft and the unique status and requirements at Milford Haven for operating Rescue 1. Consequently, there was no evidence that the operational status of N207, Rescue 1 or the associated procedures and risk assessments were considered during the internal audit.
18 The station inspection in November 2018 included an exercise of SRT techniques undertaken in the exercise yard at Milford Haven fire station. In the report it was noted that the demonstration ‘highlighted the skills of the crews’ and a comment that ‘Overall an excellent standard from a Training and Delivery perspective’. The inspection report included the following areas: 6.1 Operational Risk Management, and 6.2 People and Organisational Development & Training Delivery The lack of practical on-water training, lack of suitably qualified rescue boat crew, and the lapsed certification and operating standards for Rescue 1 were not identified as non-conformities in the internal audit report. During 2017 and 2018, peer review assessment teams, drawn from other UK based FRS regions, visited MWWFRS as part of the All Wales Operational Assurance (AWOA) process. The final report was circulated to the Chief Fire Officer in May 2018 and stated that: ‘On introduction of the statutory requirement to respond to water related incidents a small number of stations were enhanced in their water response capabilities. This additional training was absorbed without difficulty into the T&D2 Department, however it was apparent that should any further significant enhancement in equipment introduction and associated personnel training over and above of current levels would have a significant impact on the department with respect to the number of available trainers/Instructors for initial acquisition training and ongoing assessment and reaccreditation. Also this would have a significant impact on the T&D training delivery annual plan.’ [sic] and ‘Appropriate levels of initial acquisition, maintenance of competence and re accreditation via the RYA and WRBO are well established in line with the national requalification standards and timeframes.’ [sic] The peer review took into account the flood rescue capability and it referred to national standards required under the DEFRA FRCO. It did not, however, take into account the operational standards of training and certification required for Rescue 1 as a unique asset at Milford Haven. 1.8 REGULATION AND OVERSIGHT OF FRS BOAT OPERATIONS 1.8.1 Overview Although the majority of boats operated by various FRSs in the United Kingdom fall into the SRT category, and comply with the standards required by the DEFRA FRCO, several authorities also operate larger RIBs, similar to Rescue 1, and some authorities operate specialist fire-fighting boats in port areas. As fire service boats are not operated for pleasure, for legislative purposes they are classified by the MCA as commercial craft. 2 T&D – Training and delivery
19 1.8.2 National Fire Chief’s Council The National Fire Chief’s Council (NFCC) represents the whole of UK FRS with the aim of improving national co-ordination, reducing duplication of work and supporting local delivery of service. The chair of the NFCC is a single point of contact for the UK government, fire professionals and local authorities. The programme of work for the NFCC is coordinated by various committees who engage with subject matter experts. The NFCC’s national operational guidance documents were produced by its committees and were promulgated via its website3. Guidance for dealing with fires on ships and flood water rescue operations was available on this website. The national operational guidance did not provide information about certification of boats or categorisation of waters around the UK. 1.8.3 Regulations for boat operations The operation of small commercial craft around the UK is regulated either by the MCA or by the local authority, depending on whether the craft is operating ‘at sea’ or in ‘categorised waters’. Categorised waters include near coast, estuaries, rivers and other inland waters that are graded from A (most sheltered) to D (least sheltered), as defined in Merchant Shipping Notice (MSN) 1827 (M) Amendment 2. Small commercial vessels of less than 24m in length, that carry no more than 12 persons on board and proceed to sea, are required to comply with The Merchant Shipping (Small Workboats and Pilot Boats) Regulations 1998 (as amended), which is applied by the Workboat Code Edition 2, or The Merchant Shipping (Vessels in Commercial Use for Sport or Pleasure) Regulations 1998 as applied by MGN 280. Small commercial craft operating in categorised waters are regulated by the local authority responsible for those waters. The local authority sets its own requirements for commercial boat operations, which could include requiring the craft to comply with the Workboat Code Edition 2 or MGN 280. Milford Haven waterway within a line drawn from South Hook to Thorn Point was classified as Category C waters, so MWWFRS boats operating in this area were required to comply with regulation set by the local port authority. 1.8.4 Other boat operating codes The MCA allows police boats and rescue boats (such as those operated by the Royal National Lifeboat Institution) to operate under either the MGN 518(M) Police Boat Codes, Amendment 3, or the MGN 466(M) Rescue Boat Code, as applicable. These codes were developed between the MCA and the relevant organisations in recognition of the specific status, equipment and training required for these craft to operate effectively at sea, and the codes are accepted by local authorities as meeting their requirements to operate in categorised waters. In the absence of a specific code for FRS boats, MWWFRS boats operating at sea were required to comply with the Workboat Code. When operating in Milford Haven waterway and the River Cleddau, MWWFRS boats were required to comply with any regulations set by the local port authority. 3 www.ukfrs.com
20 1.9 PORT AUTHORITY Milford Haven Port Authority (MHPA) is the statutory harbour authority for Milford Haven waterway and the tidal region of the River Cleddau, including the section of the river where the accident occurred. MHPA is responsible for the navigation, safety and traffic regulation of all vessels navigating within this area. This is achieved through the use of byelaws, General Directions, Special Directions and Notices to Mariners, and included the requirement that all commercial and leisure users within the MHPA area adhere to the International Regulations for Preventing Collisions at Sea 1972 (as amended). Rule 5 of these regulations states: Every vessel shall at all times maintain a proper look out by sight and hearing as well as by all available means appropriate to the prevailing circumstances and conditions so as to make a full appraisal of the situation and of the risk of collision. MHPA had designated the area upriver from the Cleddau bridge to the vicinity of Lawrenny as a water-ski area and it was not subject to speed restrictions. Various river areas, including upriver past Lawrenny, were designated as ‘Dead Slow Minimum Wake’ zones within the MHPA Leisure Guide (Annex E). These minimum wake zones were routinely patrolled by an MHPA water ranger to ensure compliance. As the local authority responsible for ensuring standards of operations, MHPA generally adopted the MCA coding and certification requirements for commercial vessels operating in its area. Once the coding for Rescue 1 had lapsed, an agreement had been put in place between MHPA and MWWFRS to continue to operate Rescue 1 within the MHPA area without the requirement for it to be coded. This agreement had never been extended to cover the SRT boats such as N207, and no agreement was in place with any other port authority within the MWWFRS area to allow them to operate without adhering to local commercial craft coding and certification requirements. 1.10 PREVIOUS/SIMILAR ACCIDENTS 1.10.1 Collision between two RIBs Osprey and Osprey II (MAIB Report No 10/20174) Two passenger carrying RIBs, Osprey and Osprey II, collided in the Firth of Forth. A passenger who was sitting on an inflatable tube of Osprey II was crushed between Osprey’s bow and Osprey II’s helm console, resulting in her sustaining serious injuries. While proceeding in parallel at a speed of around 6 knots (kts), the skipper of each RIB increased speed and commenced a power turn away from each other with the intention of passing each other in the course of completing a round turn. However, as the RIBs turned towards each other it became apparent to both skippers that the RIBs were in danger of colliding. Although they both acted quickly to reduce the speed of their respective vessels and so lessen the impact, they were unable to prevent the collision. The manoeuvre had previously been carried out successfully on several occasions but it had not been formally risk assessed, and no thought had been given regarding what to do if a collision situation developed. 4 https://www.gov.uk/maib-reports/collision-between-rigid-inflatable-boats-osprey-and-osprey-ii-resulting-in- serious-injuries-to-1-passenger
21 1.10.2 Two Cardiff Bay Yacht Club RIBs (MAIB Report No 19/20115) Two club RIBs belonging to Cardiff Bay Yacht Club collided at night while transporting a number of children across Cardiff Bay. The RIBs were proceeding at about 20kts in the dark, and carried no navigation lights or torches. One RIB had one seat and six occupants; the other, two seats and seven occupants. Those without designated seats were sitting on the inflatable tubes. As a result of the accident, three children, who were sitting on the inflatable tubes, were thrown into the water. One of the children sustained a traumatic brain injury, two others required extended medical treatment and several of the children from both boats suffered bruising and soreness following the collision. 5 https://www.gov.uk/maib-reports/collision-between-2-rigid-inflatable-boats-while-transporting-a-number-of- children-across-cardiff-bay-wales-with-3-people-injured
22 SECTION 2 - ANALYSIS 2.1 AIM The purpose of the analysis is to determine the contributory causes and circumstances of the accident as a basis for making recommendations to prevent similar accidents occurring in the future. 2.2 OVERVIEW The FRS boats N207 and Rescue 1 collided because they were carrying out uncoordinated manoeuvres, at speed, in the same stretch of water and neither helmsman realised the risk until it was too late. Firefighter Josh Gardener died because he was struck on the head by Rescue 1 before or after being knocked out of N207 into the water. This section of the report will analyse the circumstances that led to the collision, the reasons why the boats were being operated in the same stretch of water, and the underlying factors that might have contributed to the accident and resultant loss of life. 2.3 THE COLLISION Once the two boats had left the vicinity of Mill Bay, they were headed for the same agreed location near Lawrenny, with Rescue 1 ahead and clear of N207 until its helmsman decided to execute a large full-circle turn to port. 2.3.1 Rescue 1 It was unclear why Rescue 1’s helmsman decided to undertake the full-circle turn given its proximity to N207, rather than proceeding upstream to the agreed rendezvous location. This manoeuvre resulted in the need for Rescue 1 to subsequently overtake or pass close to N207, which was conducting a series of turns under the supervision of the trainer. The turn to port took Rescue 1 downstream of N207, so it approached the slower boat from behind. When the helmsman saw N207 heading downstream toward Mill Bay as he executed the final stages of the turn, he thought that it was going to cross clear ahead of him and did not expect N207 to suddenly turn into his path. The crewman was not keeping an effective lookout and keeping the helmsman informed of the location of N207, so as Rescue 1 came out of its turn and the helmsman looked up, he was surprised to see that collision with N207 was imminent. The emotional and behavioural response to being surprised might have led to delayed collision avoidance action and disrupted problem solving. His reaction time to implement his decision - to accelerate and turn sharply to starboard - would have been affected by his competence and familiarity with Rescue 1 and its controls. The qualification to RYA powerboat level 2 should have been sufficient to drive the boat, however the helmsman’s lack of practical experience would have diminished his level of competence. Given the speed Rescue 1 was travelling, it would have been prudent to have planned a greater passing distance from the slower boat, whose exact intentions were unknown.
23 2.3.2 N207 The three crew of N207 were aware that Rescue 1 had accelerated away from Mill Bay and away from their boat. However, their collective attention then returned to the boat handling training and practice for the two firefighters. The positions of the trainer in the middle and the firefighter forward in the boat meant that they could both see forward, to starboard and astern, but neither had an easy view to port without physically moving position. The helmsman steering the boat was seated on the starboard side tube aft and had a view to port, but was focused on practice manoeuvres. As a result, during Rescue 1’s turn to port, it went out of the immediate view of the crew of N207. Because none of N207’s crew were keeping a proper lookout, the helmsman was completely unaware of Rescue 1’s position when he initially turned to port and headed downstream. After seeing the position and direction of travel of Rescue 1, the helmsman made the decision to turn further to port to avoid crossing ahead of the approaching RIB. However, because of the closing speed between the two boats, there was insufficient time for the helmsman to bring his boat further to port out of the way of Rescue 1. 2.4 LOOKOUT The lack of effective lookout and awareness of each boat’s position led to the collision situation arising. On N207 the crew were focused on their training, part of which should have been to nominate a member of the crew to keep a good lookout. With only two boats on the water in that locality, the lookout should have been able to provide the helmsman with information on Rescue 1’s position, course and speed. With that information the helmsman would not have turned into the path of Rescue 1. On board Rescue 1, the crewman had not been tasked with keeping a lookout and was not paying attention to the activity of N207. Had he done so, the risk of collision might have been identified earlier, brought to the attention of the helmsman, and the collision avoided. In the RYA publication, ‘Start Powerboating’, written to accompany the powerboat level 2 course, it states: When intending to travel at higher speeds, you must keep a really good all-round look-out. Check it is clear before you turn and be aware of other water users... In close proximity and with the relative speeds involved, there was little time to make decisions and take evasive action, especially given the level of competence and experience of most of the crew involved. 2.5 PLANNING AND CONTROL OF THE TRAINING AND FAMILIARISATION EVOLUTIONS MWWFRS procedures for any training activity required that a full briefing was undertaken prior to commencement. This briefing would be expected to include reference to any specific procedures related to the activity, any guidance and risk assessments, identification of the person in-charge and a full discussion of the intended activity. Because the decision to undertake the training/familiarisation
24 was agreed on the evening prior to the accident, there was little time to plan it thoroughly. The firefighters had assembled in the morning and held an informal discussion about the activity for the day, but because there was no formal briefing, the MWWFRS’s pre-activity planning requirements were not met. Additionally, although the trainer was identified as being in charge of the training undertaken on N207, neither of the crew of Rescue 1 were nominated as being in charge of that boat, and no individual had been identified as being in overall charge of the activity on-water that morning. Consequently, the morning’s activities were not formally planned, and the role of each boat was not discussed. With the two firefighters planned to undertake the training course in Menai the following day, the purpose and structure of the training and activities being undertaken by N207 on the day of the accident were clear, and under the control of a qualified trainer. What was unclear was the purpose and intention of the two crew managers crewing Rescue 1. Unlike N207, the crew of Rescue 1 had no plan of activities and there was no agreement to support, or be part of, N207’s training. Had formal planning and briefing taken place, steps might have been taken to avoid both boats operating at speed in the same part of the river. 2.6 QUALIFICATIONS, CREWING AND TRAINING 2.6.1 Overview The firefighters’ qualification to RYA powerboat level 2 provided them with training that was sufficient to operate boats similar to N207 and Rescue 1 as leisure users. However, since the firefighters were at work, they were obliged to comply with the higher qualification standards set by MWWFRS for operating its boats. MWWFRS’s procedures did not distinguish between the crewing requirements to be met when the boats were on operations, and when staff were undergoing training or accruing boat familiarisation time in controlled conditions. These requirements included both the numbers of crew per boat, and the level of qualifications they held. For Milford Haven fire station, which operated two boats, it was difficult to undertake any afloat training or boat familiarisation activities while complying with the operational qualification and crewing requirements. This difficulty was evidenced by the few times that either boat had been used solely for training or familiarisation in the 12 months prior to the accident at Milford Haven. 2.6.2 Training The Health and Safety Executive defines competence as being: the combination of training, skills, experience and knowledge that a person has and their ability to apply them to perform a task safely. The records of training within the MWWFRS pdrPro software recorded only that firefighters had been training with the boats, but did not record how much time any individual spent in charge or helming. The firefighters had initially been trained to a suitable standard, but the systems were not in place to maintain or build their levels of competence. There was a lack of opportunity to undertake training, to practise and hone boat skills, gain experience
25 and demonstrate knowledge. Further, the skill sustainability training that had been undertaken was focused on the SRT boats and WRBO requirements. It did not include the unique challenges of operating Rescue 1, which was the sole asset of its type within the MWWFRS area. Finally, the assurance mechanisms for checking crew competence were not effective as the MWWFRS annual verification of continued competence had not been undertaken, and was 14 months overdue. At the time of the accident, it is possible that some of Milford Haven’s firefighters were suffering from a gradual erosion of their levels of practical boat handling competence, and a general reduction in their level of safety awareness for operating their boats; in particular, Rescue 1. 2.6.3 Management oversight of training and certification MWWFRS required all firefighters crewing boats to hold the RYA powerboat level 2 qualification as a minimum, but these requirements were enhanced for the helmsman operating Rescue 1 as the boat’s operational role required it to operate offshore day and night. Had effective planning and briefing been carried out on the morning of the accident, with reference to the extant procedures, the senior officers might have recognised that there were insufficient qualified staff allocated to conduct the planned training with N207 and Rescue 1 simultaneously, and that neither of the crew managers were qualified to helm Rescue 1. The opportunities for MWWFRS management to recognise that there was a shortfall in training and familiarisation for firefighters at Milford Haven were missed several times during audits, inspections and reviews. It is apparent that once Rescue 1 had ceased to be required as a support craft for the disbanded dive team, its operational need and function were diminished. Operational documentation made scant reference to it, and the higher standard of training required for it to operate offshore and be commercially coded was no longer provided. 2.7 PROCEDURES 2.7.1 Personal protective equipment The firefighters in both boats were provided with protective equipment. These were detailed in MWWFRS procedures and as mitigation measures within risk assessments. All firefighters were wearing dry-suits with fleece undersuits, a buoyancy aid or lifejacket, and quick release heavy boots. However, on the morning of the accident, the decision was made to not wear protective headgear on either boat. The reason why this decision was taken is unclear, but some firefighters reported the helmets to be uncomfortable to wear and to hamper communications. In addition, it was a warm and sunny day. The headgear provided on N207 was of a sufficient standard to provide some impact protection. Nevertheless, given the force of the impact and the extent of the injuries suffered, it is unlikely that the wearing of the head protection provided would have prevented the firefighter’s death. By not wearing helmets, none of the firefighters on either boat complied with the personal protective equipment requirements contained within section 2.2 of AET 5.17 (Annex C).
26 2.7.2 Suitability of procedures and risk assessments MWWFRS SOPs 2.08 Flooding and 2.10 Rescues: Working Near, On, or In Water, focused on flood rescue and the boats used for that purpose. Neither SOP covered the use of Rescue 1 to respond to incidents in Milford Haven or offshore islands. Furthermore, neither of the risk assessments associated with these procedures made any reference to risks associated with operating boats. They provided very general reference to existing control measures that offered little guidance to the reader. Any additional control measures required to mitigate the risk were limited to a generic ‘Regular assessment required’ statement. Milford Haven fire station did not have local SOPs for routine boat handling familiarisation or for water rescue training. Local risk assessments had been created, but these had been for specific activities. AET 5.17 contained more useful information and requirements, but had not been updated for some time. The information concerning the SRT boats within it was incorrect, referring to boats that had been replaced by the Zodiac Milpro 470. There were other weaknesses in the procedures because by not differentiating between familiarisation, instruction and operational call-out crewing requirements, staff were provided with inconsistent messages. AET 5.17 contained an illustration of operations with an SRT boat manned by only one person, and promotional photographs of FRS staff undertaking WRBO training in Menai showed boats with only two FRS crew, contrary to the MWWFRS requirement that all boats were to be operated by three crew. While standards for emergency operation will dictate stringent requirements, the ability to train and conduct familiarisation under the same procedures was difficult, and at local level this led to the divergence from MWWFRS SOPs. 2.8 BOAT OPERATING CODES AND GUIDANCE As part of the investigation, several UK FRSs were contacted to obtain information on the operating standards adopted for their boats. For SRT boats the DEFRA FRCO formed the basis of standards across the FRSs. However, because there was no common approach across the UK to any adopted standard for larger craft, there was a variety of responses. Some boats were certificated to the workboat code, some were not certificated but operated to the standards of the rescue boat code, and some craft were not operating to any code. It was also apparent that various port authorities made assumptions about the operating standards of the FRS craft in their area of responsibility and did not verify to what standard the boats were being operated. Rescue 1 was well maintained and fully equipped for its intended tasks. However, any FRS boat being operated at sea outside categorised waters, including boats such as N207, is required to adhere to a standard agreed with the MCA. In addition, when operating on its categorised waters, most port authorities require commercial craft to be operated to standards of certification that meet the MCA requirements for coded craft. As the SRT boats frequently operate outside the DEFRA FRCO and within port areas, they must meet these requirements. It was apparent that there was no awareness by MWWFRS that local authority requirements to operate all
27 of its boats to an approved standard should apply. For Rescue 1, the lapse in the workboat code certification meant that mobilisation to offshore islands, such as the training exercise at Caldey Island earlier in 2019, and the training in August 2019 did not comply with the MCA certification requirements. Appropriate certification of its boats would provide a greater level of assurance regionally and nationally that FRS boats are being operated safely by trained and experienced staff, and that the boats are properly maintained and equipped. To assist the various FRS authorities around the UK, guidance should be provided by the NFCC. Their operations committee for marine operations and water rescue should consult with the MCA and stakeholder authority representatives for categorised waters, regarding a common approach to the application of an appropriate standard.
28 SECTION 3 - CONCLUSIONS 3.1 SAFETY ISSUES DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS
The firefighter on board N207 was fatally injured after being struck on the head by Rescue 1 when the two boats collided. [2.2]
N207 and Rescue 1 collided because they were operating at speed in close proximity when N207 turned into the path of Rescue 1. [2.2]
It is unclear why Rescue 1’s helmsman decided to undertake a circular turn to port in the vicinity of N207, but given the speed the RIB was travelling it would have been prudent to have planned a greater passing distance from the slower boat, whose exact intentions were unknown. [2.3.1]
The crew of N207 were focused on their boat handling training, and the helmsman was unaware of Rescue 1’s position when he turned sharply into its path. Due to the closing speed of the two vessels, his subsequent actions to avoid collision were not effective. [2.3.2]
Neither crew was keeping an effective lookout, and so lacked awareness of the two boats’ relative positions and movements. [2.4]
Mid and West Wales Fire and Rescue Service’s pre-activity planning requirements were not met and its SOPs were not followed, with the consequence that: no individual had responsibility for the overall activity; no-one was nominated to be in charge of Rescue 1, which had no clear task; Rescue 1 had insufficient crew, neither of whom held the qualifications required to be the RIB’s helmsman; and, no steps were taken to prevent both boats operating in the same stretch of water in an uncoordinated manner. [2.5, 2.6.3]
It was difficult for Milford Haven fire station, which operated two boats, to comply with Mid and West Wales Fire and Rescue Service crewing requirements, which reduced the amount of on-water training and familiarisation conducted in the 12 months prior to the accident. [2.6.1]
At the time of the accident it is possible that Milford Haven’s firefighters were suffering from a gradual erosion of the levels of practical boat handling competence, and a general reduction in their levels of safety awareness for operating their boats; in particular, Rescue 1. [2.6.2]
Although the firefighters crewing the boats were not wearing the head protection required by AET 5.17, it is unlikely that head protection would have been sufficient to save the firefighter’s life when he was struck by Rescue 1. [2.7.1]
Mid and West Wales Fire and Rescue Service’s procedures for boat operations had not been updated for some time, contained misleading information, and made insufficient reference to Rescue 1 as a pre-determined operational asset. [2.7.2]
29
While the standards for emergency operation will dictate stringent requirements, the ability to train and conduct familiarisation under the same procedures was difficult, and at local level this led to the divergence from Mid and West Wales Fire and Rescue Service’s SOPs. [2.7.2]
The investigation has found that some port authorities made assumptions that FRS craft operating in their areas complied with an approved standard. However, it was apparent that Mid and West Wales Fire and Rescue Service had overlooked the requirement to operate all of its boats to an approved standard, or that within a local authority or harbour area locally required standards could apply. [2.8] 3.2 SAFETY ISSUES NOT DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS
The recording of training and monitoring of competence was not robust enough to identify when a firefighter was helming a boat, and therefore ensure that sufficient experience was logged. [2.6.2]
The chance to recognise that shortfalls in training, experience, qualifications and boat certification by Mid and West Wales Fire and Rescue Service was missed during internal audits and inspections and through external peer review. [2.6.3]
Mid and West Wales Fire and Rescue Service standard operating procedures did not contain information relevant to the operation of the Zodiac Milpro 470 or the Delta 6.4m RIB. Furthermore, it did not distinguish between requirements for using the boats when staff were undertaking familiarisation, instruction or were on emergency call-out. [2.7.2]
The Fire and Rescue Service was not fully aware of the certification requirements for commercially operated boats operating in categorised and non-categorised waters, and hence Rescue 1 had been operated at sea without the necessary levels of certification. [2.8]
Standards for Fire and Rescue Service boats operating in categorised waters and at sea had been overlooked nationally. [2.8]
30 SECTION 4 - ACTION TAKEN 4.1 ACTIONS TAKEN BY OTHER ORGANISATIONS Mid and West Wales Fire and Rescue Service has:
● Appointed an independent peer review to be conducted of water-based activities by another regional Fire and Rescue Service.
● Appointed its own investigation team and commenced an internal investigation.
● Reviewed and revised its procedures 2.1, 2.08, 2.10, and AET 5.17.
● Initiated a full review of water-based requirements.
● Completed an assessment of the future provision of Rescue 1 and taken the decision in April 2020 to remove it from service.
● Reviewed the risk assessments within Mid and West Wales Fire and Rescue Service stations for special appliance activities.
● Secured funding to provide staff with Institution of Occupational Safety and Health (IOSH) and National Examination Board in Occupational Safety and Health (NEBOSH) training.
● Engaged Kent Fire and Rescue Service to undertake peer review of boat operations.
● Set up a group to discuss introducing additional on-watch boat trainers and to make recommendations to senior management.
● Commenced a risk management plan for incidents at offshore islands, including consideration of commercial contract for the transportation of firefighters if needed.
● Engaged with regulatory authorities concerning operational standards for Fire and Rescue Service boats.
● Upgraded the standard of helmets used as Personal Protective Equipment on its SRT boats from Nitro XT to Manta SAR helmets.
● Met with stakeholders in the Milford Haven waterway area to clarify the provision of a safety boat during incidents.
● Engaged with a local tug operator with the aim of establishing a memorandum of understanding for the provision of emergency response to incidents in the Waterway.
● Commenced a gap analysis to encompass the historical evolution of business planning process over the previous 20 years.
31 SECTION 5 - RECOMMENDATIONS The Mid and West Wales Fire and Rescue Service is recommended to: 2020/130 Undertake a review of the crewing and staff qualification requirements for boats within MWWFRS to determine appropriate levels for familiarisation, training and emergency operations status and include the requirement within revised procedures and guidance. 2020/131 Introduce a method of recording time spent as helmsman of its boats and implement a minimum number of hours required as helmsman to maintain competency. 2020/132 Include reference to its boats within the internal audit and inspection report process. The National Fire Chief’s Council is recommended to: 2020/133 Consult with the Maritime and Coastguard Agency and the UK Harbour Master’s Association to introduce a standard code for the operation of all fire and rescue service craft when in categorised or non-categorised waters. Safety recommendations shall in no case create a presumption of blame or liability
Annex A Extracts from Standard Operating Procedure 2.08 - Flooding
Standard Operating Procedure for: 2.8 Mid & West Wales Fire & Rescue Service SOP - 2.8 Standard Operating Procedure for: Flooding This Standard Operating Procedure (SOP) considers hazards, risks and control measures for fire & rescue service personnel attending incidents involving flooding. It incorporates the Generic Risk Assessment outcomes of MWWFRS Risk Assessment RA(SOP)2.8. AIDE MEMOIRE AIDE MEMOIRE 1 SCOPE 1.1 Fire & rescue response to flooding 1.2 Statutory Duties 2 SPECIFIC HAZARDS & RISKS 2.1 Flowing water 2.2 Primary hazards associated with flooding 2.3 Large blocked culverts 2.4 Flash floods 2.5 Working conditions 2.6 Water borne diseases 2.7 Water temperature 2.8 Specialist plant & equipment 2.9 Manual handling 3 KEY CONTROL MEASURES 3.1 Pre-planning 3.2 MWWFRS response to flooding 3.3 MWWFRS appliances & equipment
- 4 Personal protective equipment (PPE)
- 5 Safe systems of work in floodwater
- 6 Training
- 7 Flood & weather warnings
- 8 Closing Highways and Leaving the Scene
4 OPERATIONAL PROCEDURES 4.1 Prior to mobilisation 4.2 En-route 4.3 Incident plan 4.4 Equipment & PPE for flooding incidents 4.5 The correct use of MAWWFRS flood response assets 4.6 High volume pumps (HVPS) 4.7 Sandbags 4.8 Urban search and rescue (USAR) 4.9 Requesting helicopter assistance 4.10 Low risk flooding 4.11 Body recovery 4.12 Incident command unit 4.13 Multi-agency command 4.14 Personal hygiene 4.15 Crew welfare & reliefs 4.16 Activation of vehicle airbags at flooding incidents
5 ADDITIONAL CONSIDERATIONS
- 1 EAW flood warning codes
6 REFERENCES 6.1 Sources of Information 6.2 Related Documents 6.3 Questions & Answers
- SCOPE
- 1
Fire & rescue service response to flooding Flooding affects every part of a community’s normal daily existence, from shelter in domestic properties, to services such as fuel & power supplies, transport networks and communications such as telephone/computer lines. Flooding can also lead to the contamination of food and water supplies. The Fire & Rescue Service (FRS) does not have a statutory responsibility to attend flooding incidents, however Mid and West Wales Fire & Rescue Service (MWWFRS) will respond to calls for assistance in connection with flooding, including rescues from floodwater and pumping out. This SOP should be read in conjunction with SOP 2.1 – Rescues from Ice & Unstable Ground, and SOP 2.10-Rescues: Working Near, On, or In Water.
- 2
Statutory Duties Historically the three Welsh Fire and Rescue Authorities (FRAs) respond to flooding and water rescue incidents using their existing general powers to respond to ‘other eventualities’ that cause or are likely to cause death, injury or illness, as described in Section 11 of the Fire and Rescue Services Act 2004 (‘2004 Act’). There was, however, no statutory requirement for them to do so. The Fire and Rescue Services (Emergencies) (Wales) (Amendment) Order 2017 (“the Order”) introduced a duty requiring the three Welsh FRAs to make provision to respond to flooding and inland water emergencies. Rescue and protection in case of flooding and inland water emergencies (1) A fire and rescue authority must make provision in its area, to the extent that it considers it reasonable to do so, for the purpose of – a. rescuing people, or protecting them from serious harm in the event of an emergency involving flooding; and b. rescuing people in the event of an emergency involving inland water.
(2) The duty within paragraph (1) applies to an emergency falling within section 58(a) of the Fire and Rescue Services Act 2004. (3) In this article – “flooding” means any case where land not normally covered by water becomes covered by water; “inland water” means – a. rivers, streams and canals; and b. lakes, reservoirs and water-filled quarries.” c. [back to top]
- KEY CONTROL MEASURES
- 1
Pre-planning Pre-planning within MWWFRS for an emergency response to flooding combines training and equipment provision for crews, with spate-condition procedures. Where widespread flooding is likely to affect one or more areas across MWWFRS, Service Control may take necessary measures to deal with the larger amount of calls coming in from the public. Mapping flood plain overlays for the region are considered from the perspective of both Business Continuity Management (i.e. the likelihood of fire stations being affected by flooding) and for emergency response/assistance to members of the public. Pre-planning also includes an advance weather warning notification system for operational personnel. Integrated (multi-agency) major flood response The operational or physical response to a flood disaster will initially involve the emergency services as they will receive the first calls for assistance from the public. In the early stages, the priority will be the rescue of casualties from life threatening situations, removing victims from the affected area and mitigation of damage to property. In major flooding the extent of the area affected and the demands on the emergency services can over extend their resources, and it may take some
time to identify priorities and establish a robust and efficient command structure. In such cases, a coordinated major flood response will potentially involve Local Authorities, the Fire & Rescue Service, Police, Ambulance, Maritime Coastguard Agency, Natural Resources Wales, and military personnel, together with volunteer organisations such as the Women’s Royal Voluntary Service, the British Red Cross and the Salvation Army. Detailed plans for dealing with major flooding will in general be prepared and maintained by a Local Authority Emergency Planning Officer. These plans will include: • The initial emergency response; • Rescue operations; • Provision of specialist equipment; • Reception areas and rest centres; • Establishing police casualty bureaus; • Provision of information through the media; • VIP visits; • The recovery phase; • Finance. 1 Pump or Major pump (Nearest resource Mobilised)
- 2
Flood response assets of MAWWFRS The following team types have been established in the MAWWFRS region to deal with large scale flooding incidents. These teams have the capabilities as outlined in the DEFRA Flood Rescue National Enhancement Project – Flood Rescue Concept of Operations. Type E teams – Bank based All front line appliances can provide this response. The teams can provide the following functions at flooding incidents: • Pumping Operations. • Bank Based Rescue. • Shallow Water Wading (less than height of fire boot) in low energy water. Type D teams – Wading These stations have the capability to perform wading duties (low energy water and less than waste height) in order to perform rescues, provide humanitarian services and assist with pumping operations during major flooding incidents. These teams are located in the following stations: • Newtown • Llanfair Caereinion
• Talgarth • Lampeter • Cardigan • Fishguard • Pembroke Dock • Ponturdulais • Morriston • Neath • Glynneath • Haverfordwest • Machynlleth • Pontardawe • Llanelli • Ammanford • Llandysul • Llandovery • Llandrindod Wells • Haverfordwest • Fishguard • Pembroke Dock
The High Volume Pump crew based in Ammanford will also have the capability. Type C– Swift water rescue technician Swift water rescue technician (SRT) teams will have the additional capabilities to allow personnel to perform contact rescues by means of tethered swimming. They will also have the equipment to perform technical rescues using tethered boats. The teams are currently based in the following stations: • Carmarthen • Hay on Wye • Aberystwyth • Swansea Central • Welshpool Service boat stations The Service has powered safety boats (inflatable) that are suitable for deployment during flooding incidents, and are based in the following locations: • Swansea Central. • Carmarthen. • Aberystwyth. • Hay on Wye. • Milford Haven
• Welshpool Milford Haven also has a larger boat (Rigid Inflatable Boat) that may be suitable for Large Flooding Incidents.
- 3
MWWFRS appliances/equipment Appliances/equipment available within MWWFRS which can be deployed at flooding incidents include: • Major and portable pumps; • High Volume Pumps (HVPs); • Inflatable walkways; • Safety boats; • Personal flotation devices (lifejackets and buoyancy aids); • Dry suits; • Hose inflation kits; • Throw lines.
- 4
Personal protective equipment (PPE) Depending upon the Level of Response, PPE for use at flooding incidents includes: • Wet weather clothing. • Lifejackets -all appliances. • Dry suits - boats, swift water rescue (Type C) and wading personnel (Type D). • Specific safety headwear and gloves. • Powered boat operators PPE.
- REFERENCES
- 1
Sources of Information • Generic Risk Assessment 2:8 Rescues – Involving Flooding •
- 2
Related Documents • SOP 2.1 – Rescues from Ice & Unstable Ground • SOP 4.5 - Use of Helicopters at Incidents • SOP 2.10 – Rescues In or near Water Environment Agency Wales – Flood Warning Plans for local authorities
ORIGINAL AUTHOR STATION MANAGER GRIFFITHS 613 ORIGINAL ISSUE SEPTEMBER 2010 REVIEWED BY STATION MANAGER C THOMAS 612 LAST REVIEWED NOVEMEBER 2016 AUTHORISED BY GROUP MANAGER MCLINDEN CURRENT VERSION VERSION 1 [back to top]
Annex B Extracts from Standard Operating Procedure 2.10 - Rescues; Working Near, On, Or In Water
Standard Operating Procedure for:: 2.10 Mid & West Wales Fire & Rescue Service SOP - 2.10 Standard Operating Procedure for: Rescues; Working Near, On, Or In Water This Standard Operating Procedure (SOP) considers hazards, risks and control measures for fire & rescue service personnel attending incidents involving rescues; working near, on, or in water. It incorporates the Generic Risk Assessment outcomes of MWWFRS Risk Assessment RA(SOP)2.10. AIDE MEMOIRE AIDE MEMOIRE 1 SCOPE 1.1 Working in, on or adjacent to water 1.2 Statutory Duties 2 SPECIFIC HAZARDS & RISKS 2.1 Types of water hazard 2.2 Effects of cold water 2.3 Hazard areas 2.4 Weirs/stoppers 2.5 Flooding 2.6 Water borne diseases 2.7 Blue green algae 2.8 Pollution 2.9 Working conditions 2.10 Debris 2.11 Poor Rescue Attempts
3 KEY CONTROL MEASURES 3.1 Pre-planning 3.2 Rescue assets of MAWWFRS 3.3 PDA 3.4 PPE 3.5 Additional equipment carried on appliances 3.6 Methods of rescue 3.7 Specialist rescue teams 3.8 Training 3.9 Specialist Advisors 3.10 Analytical Risk Assessment 3.11 Closing Highways and Leaving the Scene
4 OPERATIONAL PROCEDURES 4.1 Mobilisation to incidents in, on or near water 4.2 Low risk water hazards 4.3 Hazard zones 4.4 PPE 4.5 Specialist Water Rescue Team - Options 4.6 Rescues from moving water 4.7 Sub-surface rescue/recovery 4.8 Body recovery 4.9 Assistance from the RNLI 4.10 Requesting helicopter assistance 4.11 Personal hygiene & Welfare 4.12 Communications 4.13 Search operations
5 ADDITIONAL CONSIDERATIONS
- 1 Characteristics of flowing water
6 REFERENCES 6.1 Sources of Information 6.2 Related documents 6.3 Questions & Answers
- SCOPE
- 1
Working in, on or adjacent to water There is an increasing public expectation that Fire and Rescue Services (FRSs) will attend water-related incidents to save life or render humanitarian services. Mid and West Wales Fire and Rescue Service (MWWFRS) responds to such incidents in accordance with Section 11 of the Fire & Rescue Services Act 2004. MWWFRS often attends incidents that require personnel to work in, on or adjacent to water. The conditions at such incidents can vary from still ponds & canals to fast flowing water, weirs and areas of mud and slurry. Climatic extremes can add further to the complexity of these incidents and significantly change the approach required (e.g. extreme cold resulting in water courses forming ice and presenting a new set of hazards to crews). Further potential variables include geographic factors such as remote locations, steep banking and restricted access. This SOP should be read in conjunction with SOP 2.1 – Rescues from Ice & Unstable Ground, and SOP 2.8 – Flooding.
- 2
Statutory Duties Historically the three Welsh Fire and Rescue Authorities (FRAs) respond to flooding and water rescue incidents using their existing general powers to respond to ‘other eventualities’ that cause or are likely to cause death, injury or illness, as described in Section 11 of the Fire and Rescue Services Act 2004 (‘2004 Act’). There was, however, no statutory requirement for them to do so. The Fire and Rescue Services (Emergencies) (Wales) (Amendment) Order 2017 (“the Order”) introduced a duty requiring the three Welsh FRAs to make provision to respond to flooding and inland water emergencies.
Rescue and protection in case of flooding and inland water emergencies (1) A fire and rescue authority must make provision in its area, to the extent that it considers it reasonable to do so, for the purpose of – a. rescuing people, or protecting them from serious harm in the event of an emergency involving flooding; and b. rescuing people in the event of an emergency involving inland water. (2) The duty within paragraph (1) applies to an emergency falling within section 58(a) of the Fire and Rescue Services Act 2004. (3) In this article – “flooding” means any case where land not normally covered by water becomes covered by water; “inland water” means – a. rivers, streams and canals; and b. lakes, reservoirs and water-filled quarries.”
[back to top]
- KEY CONTROL MEASURES
- 1 Pre-planning (Ops 45)
Station Managers must make an effective assessment and operational plan for all areas of open water in their station ground. Where applicable recording of the plan may be made using SOP 1.4 Operational Intelligence Gathering. Consideration must be made in the following areas • The geospatial reference (12 figure reference); • The name of the water hazard, including alternative/local names; • A description of the type of water hazard (e.g. static – quarry); • An approximation of size/area/width/depth; • The pre-determined attendance (PDA); • Other services/agencies that may deploy (e.g. Mountain Rescue, requested via police, RNLI); • Access points/RVPs for appliances (four wheel and non four wheel drive access); • Access points for personnel; • Access points for deploying throw lines, inflatable hose, inflatable walkways; • Access/launch points for rescue boats;
• Access points for damming/pumping (where appropriate). For rivers and/or larger water hazards, the geospatial reference may relate to access points for appliances or launch points for FRS boats.
- 2 Rescue assets of MAWWFRS
The following team types have been established in the MAWWFRS region to deal with large scale flooding incidents. These teams have the capabilities as outlined in the DEFRA Flood Rescue National Enhancement Project – Flood Rescue Concept of Operations and may also be utilised for water rescue incidents: Type E teams – Bank based All front line appliances can provide this response. The teams can provide the following functions at incidents: • Pumping operations. • Bank based rescue (shout, reach and throw). • Shallow water wading (less than height of fire boot) in static or slow moving water. Crews are required to wear eye protection when working on embankments near undergrowth and vegetation. Type D teams – wading These stations have the capability to perform wading duties (low energy water and less than waste height) in order to perform rescues, provide humanitarian services and assist with pumping operations during major flooding incidents. These teams are located in the following stations: • Newtown • Llanfair Caereinion • Talgarth • Cardigan • Lampeter • Fishguard • Pembroke Dock • Pontarddulais • Morriston • Neath • Glynneath • Pontardawe • Llanelli • Llandysul • Llandovery • Llandrindod Wells
The High Volume Pump crew based in Ammanford will also have the capability, however due to their role as HVP operators they will not be declared as a national asset Non powered boats will be strategically based at certain wading stations and may be deployed for evacuation purpose as part of wading rescue operations. Note – Wading teams are not on the PDA for water rescue incidents, however an OiC may call upon them to perform limited wading duties at an incident involving low energy water (shallow, still or very slow moving). Type C– Swift water rescue technician Swift water rescue technician (SRT) teams will have the additional capabilities to allow personnel to perform contact rescues by means of tethered swimming. They will also have the equipment to perform technical rescues using tethered boats. The teams are currently based in the following stations: • Carmarthen. • Hay on Wye. • Aberystwyth • Swansea Central. • Milford Haven • Welshpool All type C stations will have powered safety boats (inflatable) that are suitable for deployment during water rescue incidents. It is the intention of the Service to train all type C stations up to type B standard. Type B is Rescue Boat Operators. Type B teams will be qualified to operate rescue crafts in swift water environments, and using rescue crafts as a platform for swift water rescues, and tethered boat operations. A minimum of three trained boat handlers will be required to crew a rescue craft when committed for water rescue operations.
- 4 Personal protective equipment (PPE)
Depending upon the Level of Response, PPE for use when working in, on or adjacent to water includes: • Lifejackets/PFD. • Dry suits. • Specific safety headwear. • Powered boat operators/swift water rescue technician PPE. • Crews wearing fire helmets MUST undo chin strap and slacken head band within helmet
• Eye Protection (Visor or Glasses)
- REFERENCES
- 1
Sources of Information • Fire & Rescue Services Act 2004 • Generic Risk Assessment 2.1 – Ice & Unstable Ground • Generic Risk Assessment 2.8 – Flooding •
- 2
Related Documents • SOP 2.1 – Rescues from Ice & Unstable Ground • SOP 2.8 – Flooding
•
ORIGINAL AUTHOR STATION MANAGER GRIFFITHS 613 ORIGINAL ISSUE SEPTEMBER 2010 REVIEWED BY Operational risk management (858) (612) LAST REVIEWED 29 March 2018 AUTHORISED BY GROUP MANAGER (248) CURRENT VERSION VERSION 4 [back to top]
Annex C Extracts from Appliance, Equipment, Technical Instruction for: Fire Service Boats 5.17
Appliance, Equipment, Technical Instruction for Fire Service Boats Mid & West Wales Fire & Rescue Service AET - 5.17 Appliance, Equipment, Technical Instruction for: Fire Service Boats The Service has a duty to make a suitable and sufficient assessment of the health and safety risks to employees and to provide them with comprehensive and relevant information on the risks identified. The document examines the hazards, risks and control measures relating to fire service personnel using the Fire Service Boats. 1 SCOPE 1.1 Introduction 2 SPECIFIC HAZARDS & RISKS 2.1 General 2.2 PPE 2.3 Getting to Work 3 PROCEDURAL GUIDANCE 3.1 General Description 3.2 Rigid Inflatable Boat 3.3 Avon ERB 400 3.4 Standard Boat Inventory 3.5 Work Boats 3.6 Mobilising & Crewing 3.7 Standard Testing and Maintenance 3.8 Flushing of Engine (after use) 4 Aide Memoir
- 1 Safety
- 2 General Use & Information
- 3 Inventory
- 4 Standard Testing & Maintenance
5 SOURCES OF INFORMATION/ APPENDICIES 5.1 Points of Reference
- SCOPE
- 1
Introduction Within Mid & West Wales Fire & Rescue Service’s geographical area, there are several main arterial waterways, as well as costal areas. MAWWFRS has three types of boat available for incident response on these waterways • Powered Inflatables (SRT boats) • Powered Rigid Inflatable Boat (RIB) • Unpowered workboats This Appliance/Equipment Technical Instruction outlines the technical information, significant hazards and risks associated with operating Fire Service Boats, and lays down the procedural guidance to be followed when using them. [back to top]
- SPECIFIC HAZARDS & RISKS
- 1
GENERAL SRT Boats SRT boats are crewed by personnel trained and competent to RYA (Royal Yachting Association) Level 2 as a minimum. If operating in swift moving water then the crew must be trained and competent to Rescue Boat Operator (RBO) level as a minimum RIB The only RIB within the service is based at Milford Haven and the crews will hold the following additional qualifications RYA advanced powerboat certificate (for all helms) Radar course GMDSS (Global Maritime Distress Safety System). Workboats Unpowered workboats are available to enable the movement of casualties and members of the public across areas of standing or slow moving water by wading teams They may also be used by SRT teams in line with their training and safe working practices
- 2
P.P.E. All boat operators / handlers will wear Service supplied PPE SRT boats SRT boat operators will wear their SRT PPE when crewing the boat. RIB All crew will wear specialist helmets and the Crewsaver
Crewfit Life Jacket Twin275 (see AET 6.12). Work Boats All personnel handling workboats will wear wading PPE as a minimum. Any crew members working within 3 metres of the water’s edge must wear appropriate PPE (see SOP 2.8 and 2.10 for details)
- 3
GETTING TO WORK All powered boats must have a minimum crew of three; all qualified to RYA level 2 standard as a minimum All boat operators are to work within the safe systems of work as laid down in SOP 2.8 Flooding and 2.10 Working on or near water.
[back to top]
- PROCEDURAL GUIDANCE
- 1 GENERAL DESCRIPTION
The Boats used in the service are for effecting rescues from inland and specific costal waterways, they are also used for providing safety for crews working on or near water, therefore providing a safe system of work. There are three types of boat currently in use within MAWWFRS:- • Delta 650X(based in Milford Haven) • Avon ERB400 (Based with each SRT team) • Avon M9 workboat (Non mobile within each command) Training Boats and Operational Spares based at Earlswood Training Centre:- AVON W 465 Heavy Duty Workboat x3 • 5 chambers and keel all inflatable • Length 4.65 metre • Width 2.12 metre • Payload 10 persons or 1000kg • Aluminium deck Powered by outboards 30 HP Mariner 2 Stroke Engine
- 2 RIGID INFLATABLE BOATS (RIBs)
A Rigid Inflatable Boat (RIB) is a light-weight but high performance and high capacity boat, constructed with a solid, shaped hull and flexible cylindrical shaped, air inflated tubes to assist in its buoyancy. • The design is stable and seaworthy, and the inflatable collar means that the buoyancy is not lost if a large quantity of water is shipped aboard. • RIBs are commonly between 4 to 7 metres (13 to 24 ft) long, and are propelled by one or more outboard motors. Generally the power of the motors is in the range of 5 to 500 horse power (hp). Their shallow draft allows for high manoeuvrability, speed and relative immunity to damage in low speed collisions. 3.2.1 Specification The Rib is kept inflated and strapped onto its transportation trailer, with the outboard engines fitted and associated equipment stored inside the boat. RIB at Milford Haven
Boat Type
Delta Rib
Length
- 5 mtr
Engine type -
2 x Mariner 2 stroke (90Hp each) Maximum capacity
Min crew 3 persons (not max capacity)
Serial number
GB-DPS16473E101
Trailer type - Hallmark super rollercoaster 8 Additional information Night vision capability Offshore category C DSC/VHF/GPS Radar Thermal Imaging Salvage & pumping (firefighting) capability
- 3 Avon ERB 400 (SRT Boat)
The Avon Professional Emergency Rescue Boats can be used for variable depth residential flood work, river flooding including fast flowing water operations, dam and sluice rescues where accurate shore line positioning is necessary, the craft has also been proven as an effective tool in ice and quick sand rescues. An integral aluminium slatted deck is covered with tough Avon fabric to ensure 'trip free' search and rescue missions. Load securing points are fitted to the deck to allow fixing of specialised equipment in the craft. The transom can be fitted with an outboard engine. The large bearing surface of the inflatable tubes and floor spread the rescue load over a wide base, making the craft ideal for rescue operations over thin ice or soft mud.
The ERB has been designed to be capable of being stored deflated and inflated using a compressed air cylinder when the incident scene has been reached. However the Avon ERB 400’s used by MAWWFRS boats are kept inflated and are transported to the incident on a trailer. If the pressure of the buoyancy tube drops crews can use a BA cylinder to bring the tube back up to pressure. 3.3.1 SPECIFICATION Capacity • Maximum number of persons : 8 • Maximum load (persons, motor & gear) : 900 kg • Floorboard usable area : 2.26m2 • Buoyancy tube volume : 1.334m3 Dimensions • Overall length : 4.0m • Inside length: 2.8m • Overall width : 1.9m • Inside width : 0.88m • Weight empty : 91 kg • Buoyancy tube diameter : 51 cm • Folded dimensions : 137 x 72 x 45 cm Safety / Inflation • Number of airtight compartments in main buoyancy tube : 4 • Inflation valve : 4 plus keel • Inflatable keel : 1 • High pressure air (Cylinder) inflation points : 2 • Overpressure valves : 4 plus keel • Total airtight chambers: 4 plus keel
Engine Power • Engine: shaft length : (20”) long shaft • Useful HP range : 10-20 HP • Maximum HP: 25HP (unguarded propeller outboard) or 30 HP (guarded propeller) • Maximum weight of engine : 75 kg The ERB has been equipped with a 25hp Mariner marathon engine which has been fitted with a propeller guard. SPECIFICATIONS MARATHON 25 Horsepower 30 hp Dry weight 48 kg Revolutions per minute (RPM) 5000-5850 Displacement 429 cc Cylinder layout In-line Number of cylinders 2 Starting Manual Alternator system power 76 watt Trim positions 6 Induction system Loop charged (1carb) Gear shift Forward (F) Neutral (N) Gear ratio 1.92:1 Steering Tiller: M, ML Recommended boat transom type Short 435 mm - Fuel tank type Standard Fuel type Gasoline Closed cooling N/A Engine technology 2 strokes The ERB 400 Boats are located at: • Aberystwyth • Welshpool
• Swansea Central • Carmarthen • Milford Haven • Hay on Wye
- 4 STANDARD BOAT INVENTORY (RIB and SRT boats)
Boat including paddles Outboard engine Galvanised Trailer Lifejackets x 4 Waterproof lamp & charger x 1 Waterproof bag for radio x 1 First Aid kit x 1 Engine tool kit & propeller x 1 Anchor, chain & line (30 mtr) x 1 6m Painter (Bow line) x 1 Throw line in bag x 2 Body bag x 1 Plastic survival bag x 1 ERB Inventories may vary slightly from station to station, therefore this inventory is to be taken as a standard requirement.
- 5 M9 Workboats
The work boats have been supplied for crews to be able to transport people across stretches of slow, low energy water. The craft is designed to be exceptionally stable even when tested in white water conditions. The craft is lightweight and can be stowed in a bag. Its stowed weight is 20kg which can be carried by one man in line with the service manual handling standing order. The bag has several handles which can accommodate a multi person lift should it be deemed necessary in line with a dynamic risk assessment. The M9 workboats will be stored deflated and can be inflated at the incident using the supplies regulator and a BA cylinder. The Cylinder is connected to the regulator and the cylinder opened, the pressure relief valve will operate to indicate that the required pressure has been reached. When inflating the regulator and cylinder will become cold and may cause frosting. Personnel inflating the work boat must wear appropriate PPE (Gloves and eye protection) 3.5.1 Specification Length Beam Tube Weight Overall Inside Overall Inside 2.74m 2.01m 1.48m 0.70m 0.38m 20kg Stowed Displacement Capacity Dry Swamped Weight Person 89 x 46cm 1100kg 640kg 400kg 4
- 5.2 Transportation
Both the RIBs and the SRT boats are transported via a trailer and a dedicated vehicle assigned to the specific boat station. The workboats are non-mobile items of equipment and will be taken to an incident by command staff on request. There are several options for mobilising the workboat using both fire appliances and support vehicles. Below are some suggestions on how the work boats may be transported to an incident. Remove GTS
Stow in tool Locker
Stow in rear cab In response car (Skoda Yeti shown)
The suggestions above are not a definitive guide on how the work boats may be mobilised and commands may make other arrangements for their transport to an incident.
- 6
MOBILISING & CREWING Milford Haven RIB The boat will be mobilised with a minimum crew of three operators qualified to the levels detailed in section 2.0 ERB 400 These boats will be mobilised as part of an SRT response as detailed in SOP 2.10 Working on or near water Workboats These boats are part of a command’s non mobile equipment and will be available on request through control.
- 7
STANDARD TESTING & MAINTENANCE All the equipment within the standard inventory is to be inspected and maintained by Fire Service personnel in accordance with manufacturers instructions and this Appliance, Equipment &Technical document & Fire Service Manual Vol’1: Test Frequency On Acceptance After Use After Repair Weekly Quarterly 6 Monthly Annually On OIC’s Discretion On completion, Standard Test records must be completed accordingly. Due to the large numbers of various types of equipment within the inventory, standard testing should be staggered to the following frequencies: Weekly • Mainscheme Radio on the designated vehicle • Hand-held radios (portable mainscheme radio if applicable) • Water-proof lighting • Keel and sponson (ensure that each section is inflated) • Life jackets (visual) Monthly • Engine (engine tool kit & propeller)
If the engine has not been used for training or at an incident within the past 30 days then the engine should be subjected to an after use flush test as listed in section 3.8 of this AET Quarterly • Torches • Extinguishers • Trailer unit • Life jackets • All Lines • Anchor, chain & line • 1st Aid Kit Other items of equipment which may be present over & above minimum requirement: • Ratchet strap • Boat Sling • Strops & ‘D’ Shackles • Winch 6 Monthly (By insurance engineer) • Boat Sling • Strops & ‘D’ Shackles
Annually • Lifejackets 3.7.1 When carrying out a visual standard test on this equipment, things to look out for are: Boat & Trailer • The boats main structure is in good condition and that the keel & sponson are adequately inflated. • The trailer unit is in good condition, all fixings are secure, all straps & ratchets operate correctly and are in good condition and that the wheels are road-worthy. • It is also important to ensure that the engine is thoroughly flushed with clean water after use. Ancillary equipment • Ensure that the equipment is clean and dry whilst in storage. • Check that the body or structure of the item is not damaged, and that any nuts, bolts and/or fixtures are tight. • Check that metallic items of equipment are free from rust, if necessary use cloth/wire brush to remove rust and smear with oil or petroleum jelly. • Ensure that any moving parts are in good order and that the device works efficiently. The item should be lightly oiled or greased if necessary. • If the condition of a particular item of equipment is unsatisfactory, then an order for a replacement is to be completed using the ops 50 procedure where necessary. On completion, Standard Test records must be completed accordingly.
- 8 FLUSHING OF ENGINE WITH CLEAN WATER (after use)
After the boat has been used, it will be necessary for the engine to be flushed with clean water, in order to remove any silt, grit or other fine debris which may have been induced into the engine during operation. Therefore on return to station, the procedure for flushing the engine (outboard motor) is:
• Locate a drum behind the boat and fill with clean water, the advised container is to be a 45 gallon drum with the top removed. • Crew is then to lower the engine into the container, taking the utmost care when carrying out this procedure. • When the engine is lowered and the propeller is fully submerged, the Crew are to ensure that container and engine are both secure, only then can the engine be turned on. THE ENGINE IS TO REMAIN IN NEUTRAL AT ALL TIMES. • The engine is then left to idle for approx 5 minutes, enabling enough time to flush the engine thoroughly, at the same time ensuring that a fine jet of water in continually expelled from the water coolant drain. • Once flushed, turn off engine, and crew is to lift the engine clear of the drum. FULL PPE INCLUDING GLOVES AND SAFETY GLASSES ARE TO BE WORN AT ALL TIMES
[back to top]
- Aide Memoir
- 1
SAFETY All boats within Mid & West Wales Fire & Rescue Service are only to be operated by trained personnel (Minimum RYA Level 2). FULL PPE IS TO BE WORN i.e: All operators are to wear Dry-suits, Helmets etc
- 2
GENERAL USE & INFORMATION The Boats used in the service are for effecting rescues and providing safety for crews working on or near water, at inland and specific costal waterways. There are three types of boat currently in use within MAWWFRS:- • Delta 650X(based in Milford Haven) • Avon ERB400 (Based with each SRT team) • Avon M9 workboat (Non mobile within each command)
The Delta 650X RIB located at: • Milford Haven The Inflatable Boats are located at: • Aberystwyth • Milford Haven • Carmarthen • Llanelli • Welshpool • Hay on Wye • Swansea Central The Avon W465 training boat/operational spare located at: • Earlswood Training Centre
- 3
INVENTORIES Inventory found within this document is the minimum requirement for an operational boat, however may vary slightly from station to station.
- 4
STANDARD TESTING & MAINTENANCE Test Frequency On Acceptance After Use After Repair Weekly Quarterly 6 Monthly Annually On OIC’s Discretion On completion, Standard Test records must be completed accordingly.
[back to top]
- SOURCES OF INFORMATION (& APPENDICIES if necessary)
<> 5.1 POINTS OF REFERENCE Manufacturers information DEFRA guidance SOP 2.8 Flooding SOP 2.10 Working on or near water
[back to top]
ORIGINAL AUTHOR EAT 636 ORIGINAL ISSUE October 2007 REVIEWED BY
LAST REVIEWED
July 2015 AUTHORISED BY Head of Tech Svc's GM KW 124 CURRENT VERSION Version 2 REVIEW PERIOD
Annex D Health and Safety Procedural Guidance Document 5.19 - Risk Assessment
- 19-Risk-Assessment-July-2018July 2018
1 MID & WEST WALES FIRE & RESCUE SERVICE HEALTH & SAFETY PROCEDURAL GUIDANCE DOCUMENT
- 19 – Risk Assessment
US – Indicates Updated Section (US) - (for initial circulation / publishing)
Contents
- 0
Risk Assessments 2.0 Review of Procedure Appendix A – Risk Assessment Guidance Appendix B – Training Risk Assessment Appendix C – How to complete a risk assessment
Document Information
Security Classification N/A Document Owner Corporate Risk Department Document Author Head of Corporate Risk Date of Issue July 2018 Version Number 01 Date of Last Review July 2018 Date Last Amended July 2018 Date of Next Review July 2021 Approval Details Director of Operational Support and Improvement Equality Impact Assessment Reference N/A
- 19-Risk-Assessment-July-2018July 2018
2
- 0
Risk Assessment
- 1
Risk assessments can be carried out by any member of staff within a Department or Station.
- 2
Advice and guidance on undertaking risk assessments can be found within this procedure. Additional information on lone workers can be found within Procedure CR 5.21 Lone Working.
- 3
This guidance is for use by all staff to carry out risk assessments across the broad spectrum of Service activities within their own sphere of competence.
- 4
A list of those members of staff who have successfully passed either the NEBOSH or IOSH exam can be obtained from the People and Development Department. The holders of these qualifications are able to assist any member of staff with risk assessments. When approached, a qualified member of staff should respond positively and should bear in mind that it is their knowledge of the risk assessment procedures that is required and not an in-depth knowledge of the task or job to be assessed. This will be provided by the individual requesting assistance. Therefore, any risk assessment being undertaken should involve both the worker and where requested the NEBOSH or IOSH holder.
- 5
To enable uniformity of standards to be monitored and to assess the effectiveness of the risk assessment programme, copies of all risk assessments are to be forwarded to the Corporate Risk Dept, Service Headquarters, for uploading to the Service @work site. A copy should also be retained within the Station /Department. Heads of Area Response /Department Heads will have the responsibility of implementing any remedial action that may be required. (This will normally be as a result of a stage two assessment).
- 6
Department Heads will indicate on the form what action has been taken to resolve any problems before passing the assessments onto the Corporate Risk Dept.
- 0
Review of Procedure
This procedure shall be reviewed following:
i. receipt of new information; ii when introducing change to or new working procedures; iii introduction of new agreements; iv in any event after 36 months; v at any other time when the current procedure is deemed to be invalid.
- 19-Risk-Assessment-July-2018July 2018
3
Appendix A
Risk Assessment Guidance
This guidance is intended to help personnel to carry out Risk Assessments by following the procedure detailed below.
An Assessment is nothing more than a careful examination of what in your work, can harm people/property. This assessment will help to decide whether sufficient precautions have been taken; or if more needs to be done to prevent harm.
The overall aim is to make sure that no one is injured, becomes ill and that damage does not occur to equipment or property.
The important things that need to be decided are whether the hazards that have been identified are significant and whether they have been covered by adequate control measures so that the resulting risk is small.
e.g. Exposure to some chemicals presents a serious risk to health. However, by wearing Chemical Protection Suits, and Positive Pressure Breathing Apparatus, this Risk becomes negligible.
Risk Assessment Methodology
The process of Risk Assessment is carried out in two stages.
Stage 1
Identifies all significant Hazards that are present in the Workplace and takes account of:-
• who will be harmed; • the chance of that harm occurring (likely occurrence); • how much harm will occur (likely severity).
Hazards which present Risks that cannot easily be controlled require further attention, and the Stage II Assessment should be undertaken.
Stage 2
Identifies:
• the Hazards that require more attention; • the extra controls that are required to reduce the Risk to an acceptable level; • who will provide the extra controls; • when the controls are to be implemented.
The Risk Assessment should be completed by Personnel who are competent in the subject that is being assessed by their knowledge, experience or training.
- 19-Risk-Assessment-July-2018July 2018
4
Stage 1 Form (Guidance For Completion)
Does any task expose personnel or other persons to Hazardous Substances or Hazardous Environments that may affect their health?
N.B. The “Hazard Type – Guidance to Stage 1 Assessment” and “Manual Handling Assessment Stage 1” can be used in association with the guidance below.
Activity/Workplace
In order to identify the Hazards present, all the activities or Workplaces must be listed. If a procedure is being assessed, all the events of that procedure should be listed in sequence.
Hazard
The next stage is to identify the Hazards associated with each of the “Areas of Assessment” as applied to each Event, Activity or Workplace.
The Areas of Assessment are:-
Actions what tasks are being undertaken that present hazards;
Environment what elements of the working environment act on the tasks being undertaken that may cause hazards e.g. heat, humidity, cold, slippery surfaces, poor lighting, rough terrain etc.;
Equipment does any equipment being used present hazards to the operations or other persons? e.g. light weight, pump hydraulic rescue equipment, disc cutters;
Occupational Health does any task expose personnel or other persons to hazardous substances or hazardous environments that may affect their health?
e.g. • biological agents;
• noise;
• smoke;
• radiation;
• fumes;
• lubricants;
• sewers;
• flammable liquids etc.
Litigation Are there any acts or omissions possibly performed by personnel that would be deemed as negligent towards other personnel, other persons, equipment, property or the environment.
- 19-Risk-Assessment-July-2018July 2018
5
Persons at Risk Once all the significant hazards have been established, the persons that will be at risk from the hazards must be identified e.g. operational personnel, contractors, members of the public etc. This should also include the numbers of persons involved.
Existing Controls Any existing control measure relating to each Hazard should be identified and recorded. These will be taken into account when determining the Risk Rating.
Risk Rating The final part of the Stage 1 Assessment process will be to calculate the Risk Rating for each identified Hazard. This is done by estimating the likelihood of harm occurring and the Likely Severity should an accident happen.
Any existing control measure relating to each Hazard should be identified and recorded. These will be taken into account when determining the Risk Rating.
As mentioned earlier the existing control measures should be taken into consideration at this point, and the result of the calculation applied to the Risk Rating Interpretation.
Any risk that requires further action should be subject to a Stage 2 Assessment.
On Completion of the STAGE 1 Assessment Form
• one copy is to be forwarded to the Head of Area Response / Head of Department; • one copy is to be forwarded to the Corporate Risk Department; • one copy is to be kept in the Station / Department.
Stage 2 Form (HSRA 8) Guidance for Completion
Review of the assessment should be carried out on a regular basis.
Activity/Hazard The Hazard in question should be identified.
Controls Required Further control measures that are required to reduce the Risk to an acceptable level should be recorded. If the Risk Rating is very high and further control measures cannot reduce it, then it would be unacceptable to continue, and the activity should be halted.
Action by and Target Date Personnel should be identified who are going to put the controls in place and a date set for when they are to be introduced.
- 19-Risk-Assessment-July-2018July 2018
6
Monitor and Review of Assessment It is the results of this stage ii assessment that will be recorded, monitored and reviewed periodically
The Monitoring process should ensure that the Safety Controls put in place stay in place and remain effective. This should be reflected in the ‘Controls Required’ column on the Stage II Assessment form (HSRA 8).
The review, and if necessary a modification of the Assessment should be carried out on a regular basis.
Unless:
• the nature of the work changes;
• the appreciation of Hazards and Risk increases;
• there is reason to suspect that the Assessment is no longer valid;
• accidents / near misses occur which were previously unforeseeable.
On completion of the STAGE 2 Assessment Form
• One copy is to be forwarded to the Head of Area Response / Head of Department; • One copy is to be forwarded to the Corporate Risk Department; • One copy is to be kept in the folder or electronically at the location.
- 19-Risk-Assessment-July-2018July 2018
7
Appendix B
Training Risk Assessment
Training for Realism
Risk that is introduced into training must be a planned exposure with a definite purpose in mind.
• The standard drill, as set out in the Fire Service Training manual is the cornerstone of all practical training.
• The procedures and safety precautions written into the drills ensure that the safety of personnel taking part is paramount. This results in little exposure to risk whilst performing those drills.
• As skills develop, personnel should progress to more advanced types of training exercises.
• Ideally, the first time firefighters are exposed to a risk should not be at an operational incident where they would rely solely on someone else’s experience to deal with that risk.
• Personnel must, therefore, be exposed to risk whilst training and this is recognised by the Health and Safety Executive, for further guidance please see the following link.
• “If, in order to discharge his Section 2 duty, the employer has to expose the firefighter to an element of risk on the Training Ground, then the Health and Safety at Work Act does not prevent it, provided that all is done by the way of supervision and the provision of safeguards to ensure that overall, the arrangements are a safe as can sensibly be”.
Also;
“The exposure of firefighters to the risk of the training ground must be a planned exposure with a definite purpose in mind and one for which the way ahead has been prepared in previous training”.
• In order to follow this concept, drills and exercises must be formulated that introduce elements of realism. These can be conducted on station drill grounds and also at off station sites/premises.
• A drill yard at a Fire Station or Training Centre is normally a safe area until Fire Service activities are performed on it. Hazards are introduced into these training areas which have the potential for serious harm and only the controls of the risks that have been created by the hazards prevent injuries and damage from occurring.
- 19-Risk-Assessment-July-2018July 2018
8
On Station
As more Risk has to be introduced into training, then the control of that risk must be increased:-
• As more risk has to be introduced within training scenarios, as suggested by the Health and Safety Executive, then the controls of these risks must be increased.
• In order to assist Officers-in-Charge of drills/exercises to identify hazards and, therefore, determine the extent that crews are being exposed to risks, a guide has been produced that will aid the assessment of those risks and once identified controls of the risks can be formulated.
• The guide provided is for general purpose risk assessment use but can easily be adapted for any situation, including training scenarios. The assessment is carried out in two stages. Refer to the Risk Assessment Procedure Appendix ‘A’.
Planning and Organising Arrangements of the Safety Controls
• The controls that have been identified must be planned and organised in such a way that they remain in place throughout the training period and that also includes the making up of equipment following the completion of the exercise.
Monitoring of the Safety Controls
• The Officer in Charge of the exercise must observe the safety controls and note if they were effective during the training period. This includes actions taken against recommendations of a safety brief. Nominated safety officers may also carry out this function.
Review of the Safety Controls
Any observations relating to the success or not of the safety controls must be raised as part of the debrief. Any significant observations that have any bearing on Service or Fire Service activities must be reported via the Operational Learning System (OLS).
The ORM Department will sift through any reported learnings for actioning by the Head of ORM Department. An email will then be circulated to the relevant Department to take appropriate action.
In the event that a learning outcome is highlighted relating to risk critical activities, the Head of ORM will forward an email to the relevant Department.
All actions undertaken are then fedback into the OLS system for audit purposes.
Observations would include:
• any injuries, Near Miss Events occurring;
- 19-Risk-Assessment-July-2018July 2018
9 • observations regarding safety controls; • any comments that will improve safety in future training periods.
Off Station Exercise Sites
Risk Assessment is carried out in two stages
• Opportunities to hold Training Exercises at off station locations occur from time to time and full advantage should be made of them.
• The procedure for assessments will be similar as for station drills, but more reliance will be placed on the Hazard Type Guidance to Stage I because the site/premises being assessed will be relatively unfamiliar.
Safety Representatives
• Persons who have been nominated as Safety Representatives under the Safety Representatives and Safety Committee Regulations 1977 have legal rights to inspect the workplace and this includes exercise sites.
• Every effort should be made to liaise with the relevant health, safety and welfare representative in order than if they so request, they can inspect the site and details of the exercise can be viewed by them.
Risk Assessment Proforma
The following risk assessment forms will be available for Officers in Charge of exercises to carry out their assessments.
• Manual Handling Assessment – Stage I (HSMHRA Initial) Blank Manual Handling Risk Assessment Forms (HSMHRA 5) • Blank Stage I Risk Assessment Forms (HSRA 7) • Blank Stage II Risk Assessment Forms (HSRA 8)
- 19-Risk-Assessment-July-2018July 2018
10
Appendix C
How to complete a Risk Assessment Identify the activity e.g. Removing 45mm delivery hose from locker. Carrying box of photo copying paper, hose training YFF Identify all the hazards associated with the risk Slip trip fall, Manual Handling, Crush impact amputation injury, fall form height. Identify who may be at risk e.g. Service personnel, other emergency service personnel, members of the public, environment, animals.
Identify existing control measures e.g. Training, instruction, supervision, SOP’s, AET’s Mechanical aids (trolley, Pull out shelves, ladder gantry, Standard test PPE. Using the Ranking of Hazard by Risk Guidance Taking all control measures into consideration decide upon the likely occurrence of an event happening Identify Risk Enter Likely Occurrence and Likely Severity values below using the equation below:-
LO x LS = RR Risk Rating Interpretation Using the guidance chart consider your actions
Review date. Identify all the hazards associated with the risk Slip trip fall, Manual Handling, Crush impact amputation injury, fall form height. Identify Risk Enter Likely Occurrence and Likely Severity values below using the equation below:-
LO x LS = RR Risk Rating Interpretation Using the guidance chart consider your actions
Review date.
- 19-Risk-Assessment-July-2018July 2018
11
Appendix D
Annex E Milford Haven Port Authority - Leisure Guide
CAUTION: These areas have a high incidence of close quarters situations between craft of less than 20 metres in length, and vessels which can only safely navigate within the fairway. Recreational craft should navigate with extreme caution in these areas and should monitor VHF channel 12 at all times when within the Haven. Users are advised that Port Vessels and Police Marine Unit vessels patrol near Terminals to maintain BL27. NOTE: Tugwash may be experienced at the entrance and in the west channel whilst escorting tankers. 5 BLASTS (DANGER) You must make clear your intentions and indicate that you are getting out of the way 2 BLASTS 1 BLAST Long blasts every two minutes ship operating in fog 3 BLASTS 2019 Leisure User Guide Please see over for more information about the Waterway. Dead Slow Minimum Wake These areas are designated for navigational safety and importance for wildlife. Bays, creeks and tributaries provide vital feeding and breeding areas. At low water most of these areas may dry out or become very shallow revealing submerged natural features. The restriction on speed and wake reduces disturbance and helps protect wildlife from swamping or being panicked by fast moving vessels, and the environment from damaging effects of wake and vessel contacts. Operating at slow speed in these areas also reduces the possibility of serious injury or damage and also helps to reduce conflicts between users and ensures safe navigation for all. Jet Ski/PWC Aquabatics Area Personal Watercraft (PWC) aquabatics are ONLY permitted in the Pwllchrochan Flats PWC area. PWCs are permitted elsewhere in the Haven if they navigate considerately with due care and attention and in compliance with Harbour Bye-laws and zoning. Water-skiing Areas In the interest of safety, vessel owners should be mindful of their wake in these areas and transit with caution. Potential Renewable Test Bed Sites Sensitive Habitat Zone - Voluntary No Anchoring National Park Castle Hotel or Public House Yacht Club Launch Site Fuel Public Pontoon (Seasonal) Privately owned/operated Pontoon (Seasonal) Marker Buoys Moorings (Commercial) Day Visitor Moorings These moorings are for the use of vessels up to a max length of 40ft and max weight of 10 tonnes during daylight only. The skipper must ensure sufficient depth of water and swinging area is available for the vessel to be secured. Full conditions of use can be found at www.mhpa.co.uk/marine-leisure-services/ Defibrillator (accessible from water) Defibrillators can be found at: Hazelbeach: public toilet wall at the top of the pontoon Burton: public toilet wall in the car park Neyland Marina: top of the gangway entrance Milford Marina: Pier Head Dale: the boathouse Lawrenny Arms: behind the bar Black Tar: top of slipway. All Pilot Vessels and the Water Ranger RHIB carry defibrillators (contact details overleaf.) Leading Lights in the Haven Haven Approach: West Blockhouse (WBH) Watwick Beacon (WB) 022(T) West Channel: Great Castle Head (GCH) Little Castle Head (LCH) 040(T) Main Channel: Popton and Bullwell beacons (PP) (BW) in line 095(T) 094(T) Milford Shelf: Beacons above Newton Noyes (NN) 080(T) 087(T) Dale
- Approximate Ferry Times
St. Ann’s inwards at 1145 hours Depart Ferry Terminal at 1445 hours St. Ann’s inwards at 2345 hours Depart Ferry Terminal at 0245 hours NOT TO BE USED FOR NAVIGATION Carew and Cresswell Rivers Navigable only with great care and local knowledge. Pembroke River Navigable only with great care and local knowledge St Ishmaels Sandy Haven Gelliswick Angle Milford Haven Llanstadwell Neyland Pembroke Dock Pembroke Burton Llangwm Hook Landshipping Lawrenny Cresswell Quay Carew Upton Little Milford Haverfordwest Castle Pill Neyland Marina Toll Bridge Rudder’s Boatyard Cresswell River Garron Pill Sprinkle Pill Eastern Cleddau Western Cleddau Beggar’s Reach Carew River Benton Castle Millin Pill Picton Point Picton Castle Slebech Blackpool Mill Pembroke Ferry Cosheston Pill East Llanion Marine Hobbs Point Wear Spit Beacon Ferry Port* Westfield Pill Nature Reserve Milford Marina Milford Haven Port Control Thorn Island Stack Rock RNLI Lifeboat Station Tanker Terminal Keep Clear Tanker Terminal Keep Clear Tanker Terminal Keep Clear East Channel West Channel St Ann’s Head Lighthouse Lighthouse (WBH) (WB) (GCH) (LCH) (PP) (BW) (NN) Pwllchrochan Flats (shallow at low tide) Dale Anchorage Area used by sail training centres for teaching beginners. Proceed with caution. Mid Channel Rocks Valero Refinery Puma Energy Ltd. Pembroke Power Station South Hook LNG Valero Pembrokeshire Oil Terminal & Dragon LNG www.mhpa.co.uk f PortofMilfordHaven t @mh_port Horn Signals Area used by sail training centres for teaching beginners. Proceed with caution. List of Admiralty Charts 1478, 2878, 3273, 3274, 3275
Leisure Charts SC5620 folio | Imray Y26 and 2600 ATLAS refer Pembroke Barrage To request barrage opening, ring County Hall 01437 764551 Operating times 07:00-19:00 weekdays 09:00-12:00 Saturdays Please request 72hrs in advance Please respect this environment: take your litter home with you and follow the Pembrokeshire Marine Code. Together we’ll protect the amazing plants and wildlife found along the Waterway. To find out how you can protect marine wildlife go to www.pembrokeshiremarinecode.org.uk or download the Pembrokeshire Marine Code App. •
It is recommended that you: Inform Tell others where you are going and when you will be back. Tides and Weather Check the tides and forecast to ensure conditions are and will remain suitable for your vessel and activity. SOS Device Carry a marine VHF radio with Ch16 and capable of listening to Ch12 (harbour working channel) as well as any other means of calling for help. Wear a LifejacketYou never know when you might need it and it could just save your life. Engine and Equipment checks Ensure you have appropriate working equipment and spares aboard and that all moorings or anchors being used are capable of withstanding extreme weather conditions. Training Ensure your vessel is handled in a competent manner and avoid taking unnecessary risks. RNLI safety information is available by visiting www.rnli.org.uk The Water Ranger The Water Ranger patrols the Waterway in a grey RHIB with Patrol on the sides from St Ann’s Head at the entrance to the Haven, upriver to Haverfordwest on the Western Cleddau, and Blackpool Mill on the Eastern Cleddau. The main aim of this service is to provide information, advice and assistance to all Waterway users, police the zoning system and enforce the appropriate Bye-laws. www.mhpa.co.uk/water-ranger If you wish to contact the Water Ranger please call 01646 696100. Further information for recreation users can be found by visiting www.mhpa.co.uk/marine-leisure-services Waterway patrol vessels Port pilot vessels operate throughout the Waterway 24/7 and can be recognised by their green hulls and white superstructure. All patrol vessels keep radio watch on channel 12. Sharing the Estuary Safely You are sharing the Haven with wildlife, commercial activity and a whole range of other leisure activities. To promote the safety of navigation and reduce conflict between users, the Waterway is zoned for high speed activity. The zones also ensure that the sensitive areas of the Haven remain tranquil and can be used for quiet enjoyment. The Milford Haven Port Authority Bye-laws (see page 14) control navigation and should be followed at all times. Conservation & Wildlife The Haven is a special place, protected for its tranquil, scenic landscape and varied wildlife. The upper and lower reaches form part of the Pembrokeshire Coast National Park because of their unspoilt character. For more information on exploring the National Park visit: www.pembrokeshirecoast.org.uk In spring and summer the peaceful bays and rivers form breeding grounds for many birds, whilst in winter up to 25,000 birds such as shelduck, teal, widgeon, curlew and redshank come here to feed. Many parts of the foreshore are Sites of Special Scientific Interest and the whole Haven forms part of the Pembrokeshire Marine Special Area of Conservation because of its international importance for marine wildlife above and below the water. For more information visit www.pembrokeshiremarinesac.org.uk Human activities in the Haven can damage and disturb wildlife and its habitats. Please think and act in an environmentally friendly way by following the zoning, Bye-laws and Pembrokeshire Marine Code. Following the Marine Code will help you to enjoy the best of the coast without disturbing sensitive wildlife. www.pembrokeshiremarinecode.org.uk Recreation Activities A whole range of water-based recreation activities take place on the Waterway, including sailing, power boating, water-skiing, personal watercraft use (jet-skiing), windsurfing, canoeing, fishing, diving and bathing. Activities take place both on an informal basis and through organised events. Navigation Notes Commercial Vessel Speed Large commercial vessels may, at times, make passage at higher speeds than expected to maintain proper control and steerage. Users should monitor the approach of vessels and remain clear when required. Approach for Milford Docks Leading lights 348° fixed blue in line with fixed blue on white background attached to wall below the Lord Nelson Hotel. Cleddau Bridge There may be confused water by bridge piers approximately 1 hour before and after High Water springs. Lifeboats A Tamar class lifeboat and an inflatable ‘D’ class inshore lifeboat are based at Angle. People in danger and needing rescue services should contact Milford Coastguard - 999 - ask for Coastguard, or call on VHF channel 16 using accepted emergency procedures. Public Pontoons (Mar-Oct) A maximum stay of 12hrs is permitted with no return within 24hrs. The ‘T-Head’ must remain clear at all times for embarking /disembarking. Fishing Restrictions Welsh Government legislation and the Bass Order 1990 restrict fishing between 30th April and 1st November in areas of the Waterway. Fishing methods, minimum sizes and catch quantities are also controlled throughout. For information call 0300 025 3500. Fishing for salmon, trout, freshwater species and eels within the Waterway requires a valid UK rod licence. Local Weather Information Weather forecasts are broadcast by Milford Haven Coastguard on channels 16 and 84. Times: Inshore weather 0750, repeated three hourly, and 1950, repeated three hourly. Strong wind and gale warnings are broadcast as soon as they have been received and on subsequent three hour forecasts. ∏ ✔ ® Tidal Information Differences at High Water Approximate times to be applied to Milford Haven High Water predictions Dover +5 hrs Tenby -14 mins Fishguard +1 hr 3 mins Swansea +5 mins Neyland +2 mins Ilfracombe -30 mins Haverfordwest +10 mins Padstow -50 mins Tidal Streams Across the entrance to Milford Haven the streams run approximately at right angles to the line of approach; well within the entrance they run nearly parallel to the channel. The tidal streams run approximately as follows: Position Interval from High Direction Water Milford Haven 1 mile outside entrance +0455 East -0125 West Maximum spring rate in each direction is 2.25 knots Inside the entrance -0555 Ingoing +0030 Outgoing Maximum spring ingoing rate is 1.5 knots and outgoing rate is 1.75 knots It should be noted that heavy swell may be experienced until inside St Ann’s Head in adverse conditions as far as Angle Light-bouy. Tidal streams within the Haven run in the direction of the deepwater channel as far as Wear Point (51°42’N, 04°59’W). In the reach above the Wear Point the ingoing stream is deflected to the north side of the channel by Carr Spit (51°42’N, 04°57’.8W). In Pembroke Reach the ingoing stream runs principally in the channel north of Dockyard Bank, attaining a spring rate of 2.0 knots; it is weak and irregular in the channel south of this bank, in which it attains a spring rate of 0.5 knot. The outgoing stream runs strongly in the channel south of the Dockyard Bank, attaining a spring rate of 2 knots. It is weak on the south side of the channel, north of the bank; in the north part of the latter channel an eddy runs strongly during the outgoing stream. Safety FOG - recommended procedure for small craft in visibility of 0.5 mile or less
- All craft with VHF radio maintain a listening watch on channel 12
- Provided you are aware of your position and you intend staying
out of the fairway, monitor the commercial activity reported on channel 12
- If you are uncertain of your position, it may be prudent to
anchor clear of the shipping channel until visibility improves Sound signals used by vessels in the area (Bye-laws No 9) Signal Meaning Four short blasts in A power-driven vessel underway rapid succession is about to turn around (altering course more than 135°) Followed after a short interval by One short blast Vessel turning with head to starboard or Two short blasts Vessel turning with head to port Three short blasts Vessel operating to stern One long blast, two Power-driven vessel or vessel not short blasts under command unable to give way to a sailing vessel Five short blasts A vessel is doubtful if you are taking sufficient avoiding action Æ f 7 ! 1 ∫ Been involved in an incident on the Waterway? Report to Milford Haven Port Control on 01646 696136/7 or complete an incident report form, found on the Port's website: goo.gl/yqhWwz Further Information Key Contacts VHF Channel STD number Milford Haven Port Control 12 01646 696137 Water Ranger 12 & 16 01646 696100 Milford Pierhead 14 01646 696310 Castlemartin Firing Range 16 01646 662367 Emergency Numbers HM Coastguard 999 or 01646 690909 Police (inc. Marine Unit) 999 or 0845 330 2000 Customs 0800 595000 Withybush Hospital, Haverfordwest 01437 764545 Natural Resources Wales (Incident Hotline) 0300 065 3000 Berths/Boatyards/Chandlery Dale Sailing 01646 603110 East Llanion Marine 01646 686866 Lawrenny Quay 01646 651212 Milford Marina and Boatyard 01646 696312/3 Neyland Marina 01646 601601 Quadra Marine 01646 278270 Rudders Boatyard 01646 600288 Windjammer Marine 01646 699070 Yacht Clubs Dale 01646 636362 Neyland 01646 600267 Pembrokeshire 01646 692799 Pembroke Haven 01646 684403 Other Tourist Information Centre, Haverfordwest 01437 775244 Pembrokeshire Coast National Park 01646 624800 Pembrokeshire County Council Beaches Dept. 01646 602105 Crime Stoppers 0800 555111
Marine Accident Report
FD06063 | 2020_英国_grounding-and-recovery-of-container-feeder-vessel-thea-ii-and-tug-svitzer-josephine__2020.pdf
分类:06_境外及港澳台调查报告 | 年份:2020 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
ACCIDENT REPORT ACCIDENT REPORT Report on the investigation of the grounding and recovery of the container feeder vessel Thea II and the tug Svitzer Josephine in the approaches to the Humber Estuary on 15 December 2018 SERIOUS MARINE CASUALTY REPORT NO 15/2020 AUGUST 2020
The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be in admissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2020 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. All MAIB publications can be found on our website: www.gov.uk/maib For all enquiries: Marine Accident Investigation Branch First Floor, Spring Place 105 Commercial Road Southampton United Kingdom SO15 1GH Email: maib@dft.gov.uk Telephone: +44 (0) 23 8039 5500 Fax: +44 (0) 23 8023 2459 Press enquiries during office hours: 01932 440015 Press enquiries out of hours: 020 7944 4292
CONTENTS GLOSSARY OF ABBREVIATIONS AND ACRONYMS SYNOPSIS 1 SECTION 1 - FACTUAL INFORMATION 2 1.1 Particulars of Thea II and Svitzer Josephine 2 1.2 Narrative 3 1.2.1 The grounding 3 1.2.2 Actions post-grounding 6 1.2.3 Recovery of Svitzer Josephine and Thea II 8 1.3 Damage sustained 11 1.3.1 Thea II 11 1.3.2 Tug Svitzer Josephine 11 1.3.3 Tug Yeoman 11 1.4 Environmental conditions 12 1.5 Thea II 13 1.5.1 Crew 13 1.5.2 Vessel background 13 1.5.3 Thea II’s managers 13 1.5.4 Anchor arrangement and guidance 14 1.5.5 Failure of main engine 15 1.6 Svitzer Josephine 15 1.6.1 Crew 15 1.6.2 Tug background 15 1.7 Yeoman 17 1.7.1 Crew 17 1.7.2 Vessel background 17 1.8 Humber Port and Vessel Traffic Service 18 1.8.1 Overview 18 1.8.2 Risk assessment 18 1.8.3 Accident statistics 18 1.8.4 Environmentally sensitive sites 19 1.8.5 Humber Estuary Serious Marine Emergency Plan 19 1.8.6 Vessel traffic services 19 1.8.7 Immingham Oil Terminal duty fire tug 22 1.9 Guidance on anchoring 22 1.9.1 Length of anchor cable deployed 22 1.9.2 Use of a second anchor 23 1.10 The role of the Secretary of State’s Representative 23 1.11 The role of the duty counter-pollution and salvage officer 25 1.12 Towage and salvage contracts 25 1.13 Similar accident 26 SECTION 2 - ANALYSIS 27 2.1 Aim 27 2.2 Overview 27 2.3 Thea II – grounding 27 2.3.1 Main engine failure 27 2.3.2 Thea II dragging anchor 27 2.4 Svitzer Josephine – grounding 28 2.4.1 Master’s appreciation of risk 28 2.4.2 Vessel Traffic Services Humber’s advice 29
- 5 Salvage of Thea II
30 2.5.1 Emergency response by ABP Humber 30 2.5.2 Emergency response by Thea II’s managers 31 2.5.3 Emergency response by the SOSREP and the DCPSO 32 2.6 The tow to the anchorage 32 SECTION 3 - CONCLUSIONS 34 3.1 Safety issues directly contributing to the accident that have been addressed or resulted in recommendations 34 3.2 Other safety issues not directly contributing to the accident 35 SECTION 4 - ACTIONS TAKEN 36 SECTION 5 - RECOMMENDATIONS 37 FIGURES Figure 1: Thea II, post-grounding, alongside in Hull Figure 2: Svitzer Josephine Figure 3: Overview of the accident track from 1501 on 15 December until 0115 on 16 December Figure 4: Thea II and Svitzer Josephine viewed from the search and rescue helicopter, aground on the Binks Shoal Figure 5: Yeoman (Hong Kong class) tug Figure 6: Thea II’s passage, under tow, from the Binks shoal to the deep water anchorage Figure 7: Yeoman’s propellers fouled by Svitzer Josephine’s towline Figure 8: Thea II’s D’Hone, high holding power anchor Figure 9: Svitzer Josephine’s underwater arrangements Figure 10: Marine protected areas at Spurn Head Figure 11: VTS display showing up to date S57 chart data Figure 12: Scope of deployed anchor Figure 13: Use of the second anchor
GLOSSARY OF ABBREVIATIONS AND ACRONYMS ABP
Associated British Ports
AHM
Assistant Harbourmaster
AIS
Automatic Identification System ALB
All-weather lifeboat
ASD
Azimuth stern drive BA
British Admiralty
BIMCO
Baltic and International Maritime Council
BRM
Bridge Resource Management C/E
Chief engineer
DCPSO
Duty counter-pollution and salvage officer DPA
Designated Person Ashore
ECP
Emergency check-off plans
ECS
Electronic chart system
GPS
Global positioning system GTGP
- Guide to Good Practice
HESMEP
Humber Estuary Serious Marine Emergency Plan IACS
International Association of Classification Societies IALA
International Association of Lighthouse Authorities
INS
Information Service IOT
Immingham oil terminal kg
kilogram kt
knot kW
kilowatt LOF
Lloyd’s Open Form m
metre
MCA
Maritime and Coastguard Agency
MGN
Marine Guidance Note mm
millimetre
MRC
Marine Response Centre
NAS
Navigation Advisory Service NCP
National Contingency Plan
nm
nautical mile
OOW
Officer of the watch
PMSC
Port Marine Safety Code RNLI
Royal National Lifeboat Institution
SAR
Search and rescue
SMCP
Standard maritime communications phrases
SMS
Safety management system
SOSREP
Secretary of State’s Representative STCW
- International Convention on Standards of Training, Certification and
Watchkeeping for Seafarers 1978, as amended (STCW Convention) t
tonne
TOS
Traffic Organisation Service VHF
Very high frequency radio
VSP
Voith Schneider propeller
VTS
Vessel Traffic Service
VTSO
Vessel Traffic Service operator TIMES: all times used in this report are UTC unless otherwise stated.
1 SYNOPSIS At approximately 1500 on 15 December 2018, the main engine of the Cyprus registered container feeder vessel, Thea II, failed while approaching the Humber pilot station. With no propulsion the master anchored the vessel in gale force weather conditions. While awaiting the arrival of tugs, the weather deteriorated further and Thea II dragged its anchor towards the Binks shoal. At 1739, before Thea II could be towed clear, the container vessel and one of the tugs attending, Svitzer Josephine, ran aground. Search and rescue assets were deployed, but no personnel were evacuated from either vessel. As the tide rose, both vessels refloated. Just before 2200, Svitzer Josephine was able to get underway and return to harbour. However, Thea II’s tow was delayed while the vessel’s managers attempted to agree contractual terms with another tug operator. At about 0100 the following day, its managers signed Lloyd’s Open Form. The vessel was then towed to the deep water anchorage before being taken into harbour on 16 December 2018. There were no injuries and no pollution as a result of this accident. The investigation found that Thea II had lost propulsion due to the failure of its main engine governor, which could not be repaired, and the master had no choice but to anchor the vessel and await the arrival of tugs. However, as the weather deteriorated and the vessel began to drag towards the Binks shoal, the master did not deploy all his remaining chain or his vessel’s second anchor. Had he done so, it would have slowed or arrested the vessel’s rate of drift and allowed more time for tugs to secure lines and tow the vessel clear. The investigation also found that the tug Svitzer Josephine grounded because the master, focused on passing the towline to the crew of Thea II, lost positional awareness and did not appreciate the rate of drift of both vessels towards the Binks shoal. Thea II refloated on the rising tide. However, despite the best efforts of the harbourmaster, the Maritime and Coastguard Agency and local tugs, in difficult weather conditions, Thea II’s managers only agreed salvage terms 2½ hours later, under the threat of formal direction from the Secretary of State’s Representative. This delay almost led to Thea II re-grounding, risking damage to an environmentally sensitive area. As a result of this accident, action has been taken by Associated British Ports Humber and Svitzer Marine Ltd, to review their risk assessments and operating procedures. The Secretary of State’s Representative has continued an industry wide engagement programme to promote a greater understanding of his role. A recommendation has been made to Thea II’s managers, TS-Shipping, to review their emergency response organisation and procedures.
2 SECTION 1 - FACTUAL INFORMATION 1.1 PARTICULARS OF THEA II AND SVITZER JOSEPHINE SHIP PARTICULARS Vessel’s name Thea II Svitzer Josephine Flag Cyprus United Kingdom Classification society DNV GL Lloyd’s Register IMO number/fishing numbers 9107394 8919219 Type Container feeder vessel Tug Registered owner MS Thea II Schiffahrts GmbH & Co. KG Svitzer Marine Ltd Manager(s) TS-Shipping GmbH & Co. KG. Svitzer Marine Ltd Construction Steel Steel Year of build 1995 1991 Length overall 94.09m 28.13m Gross tonnage 2899 364 Minimum safe manning 6 3 Authorised cargo Containers None VOYAGE PARTICULARS Port of departure Amsterdam, Netherlands Immingham, United Kingdom Port of arrival Hull, United Kingdom Immingham, United Kingdom Type of voyage International Coastal Cargo information 85 containers Not applicable Manning 11 3 MARINE CASUALTY INFORMATION Date and time 15 December 2018, at 1739 Type of marine casualty or incident Serious Marine Casualty Location of incident Approaches to the Humber Estuary Injuries/fatalities None None Damage/environmental impact Minor damage to ship’s bottom, steering gear and deck vents Water damage to engine room ventilation system and accommodation spaces Ship operation At anchor Underway Voyage segment Arrival Mid-water External & internal environment The wind was south-easterly force 9-10, accompanied by a 4-5m sea Persons on board 11 3
3 1.2 NARRATIVE 1.2.1 The grounding On the evening of 14 December 2018, Thea II departed Amsterdam, Netherlands, bound for Hull, United Kingdom. The vessel was loaded with 85 containers, 46 of which were carried on deck (Figure 1).The container feeder vessel Thea II alongside after the accident Figure 1: Thea II, post-grounding, alongside in Hull Thea II’s passage across the North Sea was uneventful. However, by the following afternoon on 15 December, as Thea II approached the Humber, the weather deteriorated and the wind increased to south-easterly force 8, accompanied by a 2-3m sea. At 1501 an operator at vessel traffic service (VTS) Humber observed that Thea II’s speed had reduced to zero and enquired using Very High Frequency (VHF) radio if there was a problem. Thea II’s master responded that the main engine had failed, the ship was now 'not under command’ and that it required tug assistance. The VTS operator (VTSO) advised the master to anchor in his present position while tugs were sought. Three minutes later, Thea II’s master reported that the vessel had anchored using its port anchor with 5 shackles of cable in the water. The VTSO subsequently contacted Humber coastguard and notified them of the incident. The VTSO then tried to raise the crew of Svitzer Josephine (Figure 2), Immingham Oil Terminal’s (IOT) duty fire tug, on VHF radio, to enquire if they were able to assist Thea II. The call went unheard as the tug’s bridge was not manned. The VTSO then contacted the IOT duty officer and requested that he activate the duty fire tug alarm. The alarm was heard on board the tug, and Svitzer Josephine’s master immediately contacted VTS Humber. The VTSO informed him that the container feeder vessel Thea II had broken down, was anchored on the north side of the channel and needed urgent tug assistance. Svitzer Josephine’s master agreed to assist. He then asked the VTSO to notify the Svitzer office of their tasking so that they could arrange a replacement fire tug.
4 Figure 2: Svitzer Josephine The tug Svitzer Josephine Image courtesy of balticshipping.com Shortly after Thea II had anchored, the port suspended pilotage due to the deteriorating weather conditions. The VTSO observed Thea II moving very slowly to the north and, concerned that it might be dragging its anchor, called the vessel on VHF radio: “At the moment you are moving at about 0.5kts to the north, caution shallow water. You may need to consider dropping more cable. Do not drop another anchor, but you may need to drop more cable.” Thea II’s master confirmed that he understood the instructions and the vessel’s drift appeared to stop. At 1507, having briefed his crew, Svitzer Josephine’s master got the tug underway and commenced the 14nm passage downriver towards Thea II. During the passage the master quickly realised that a second tug would be required to safely tow the container vessel. He contacted the Svitzer office, which tasked Svitzer Castle to assist. At 1546, shortly after sunset1, Svitzer Castle’s master reported to VTS Humber that it was on passage to join Svitzer Josephine to tow Thea II into port. A harbour pilot was also placed on stand-by to board the disabled vessel if weather conditions improved. At 1630, Thea II’s master first emailed the vessel’s managers informing them that Thea II’s engine had stopped and the vessel was anchored by the side of the channel. At 1633, just before low water Spurn Head2, the VTSO observed Thea II drifting north-west at 1.7kts (knots) (Figure 3). He called the vessel and enquired if Thea II was dragging its anchor. The master confirmed that this was the case and reported that he was deploying a further shackle of anchor cable. However, this did not stop the vessel’s drift. 1 Sunset was at 1540. 2 Low water Spurn Head was at 1637.
5 Figure 3: Overview of the accident track from 1501 on 15 December until 0115 on 16 December Chart showing an overview of the accident Reproduced from Admiralty Chart 0104-0 by permission of HMSO and the UK Hydrographic Office 1501 - Thea II loses propulsion 2337 - Harbourmaster issues special direction 1739/44 - Svitzer Josephine and Thea II ground 0115 - Irishman and Yeoman tow Thea II to deep water anchorage 0054 - Thea II agrees LOF with SMS Towage 1505 - Thea II anchors 1629 - Thea II drags anchor 1707 - Svitzer Josephine leaves navigational channel 2207 - Svitzer Josephine refloats and returns to Immingham under its own power 1726 - Svitzer Josephine commences passing tow to Thea II 2330 - Irishman and Yeoman on scene, ready to pass lines Time Wind (dirn/ force Tidal force (dirn/kts)
6 Shortly afterwards, Svitzer Josephine rounded Spurn Head, followed 20 minutes later by Svitzer Castle. Svitzer Josephine’s master noted that the weather had deteriorated, and the wind was now south-east force 9-10, accompanied by a 4-5m sea. At 1707, as the two tugs left the main channel, Svitzer Josephine’s master and the VTSO discussed the situation. The tug’s master confirmed its draught as 5.4m and expressed his concern that, given the weather conditions, he was unsure if his tug would be able to secure a tow to Thea II and move it into deeper water. The VTSO acknowledged the tug master’s concern and emphasised that Thea II was in need of urgent assistance. He finished the exchange by stating: “Yeah that’s fine and having worked at Spurn for some time I’ll keep an eye on you and if I think you’re getting too close to the bank I’ll let you know. I don’t have a chart but from low water experience [Thea II] should be OK at the moment.” At the time, Thea II, also with a draught of 5.4m, was 7 cables from grounding on the Binks shoal. Svitzer Josephine’s master then contacted Thea II’s crew. He established that the container vessel’s port anchor was deployed and directed Svitzer Castle to stand off while he made his approach to pass the towline. It took 15 minutes for Thea II’s crew to make the towline fast. At 1739, as Svitzer Josephine’s master tried to tow Thea II, he found his tug was aground. He reported this to VTS Humber, who in turn contacted Thea II’s master, who responded that his vessel was also aground. 1.2.2 Actions post-grounding At 1751, concerned that there might be a need to evacuate personnel from both vessels, Humber coastguard requested the launch of the Spurn Head Royal National Lifeboat Institution (RNLI) all-weather lifeboat (ALB). Shortly after the lifeboat was underway, Svitzer Josephine’s engine room fire alarm sounded, and the master ordered both engines to be stopped. With no propulsion, the tug pounding the seabed and waves breaking over the vessel, the master became concerned for the crew’s safety and ordered them to don immersion suits and lifejackets. He then contacted Humber coastguard to request evacuation. The coastguard acknowledged his call for assistance and activated a search and rescue (SAR) helicopter to attend. At 1758, the Humber harbourmaster activated the Humber Estuary Serious Marine Emergency Plan (HESMEP) and established the Marine Response Centre (MRC) at the port’s Grimsby office. At 1824, the Maritime and Coastguard Agency (MCA) and the Secretary of State’s Representative (SOSREP) were informed of the incident. At 1900 the SAR helicopter arrived on scene but, having assessed the situation, the pilot declared the weather conditions out of limits for conducting a winch transfer (Figure 4). The ALB offered to evacuate non-essential personnel from Thea II and Svitzer Josephine, but as the watertight integrity of both vessels was still intact their masters declined.
7 Figure 4: Thea II and Svitzer Josephine viewed from the search and rescue helicopter, aground on the Binks ShoalVideo still from footage taken by rescue helicopter showing the vessels aground Image courtesy of Maritime and Coastguard Agency The harbourmaster arrived at the Grimsby port offices shortly after 1900. Conscious of the opportunity provided by the rising tide and forecast moderation in the weather, he contacted another of the port’s tug operators, SMS Towage Ltd, to establish if they had vessels that could assist. As a result of these discussions it was agreed that SMS’s shallow draught (3.5m) Hong Kong class tugs, Yeoman and Irishman, would attend once they had completed their tasking at Hull. At approximately 1920 the two tugs commenced their passage downriver towards Thea II. Thea II’s master had been in contact with the vessel’s managers by email since 1630, updating them on the tugs’ arrival. The chief engineer (C/E) was also in email correspondence regarding the engine defect. However, there was no mention of dragging anchor until 1948, when the master informed the managers that the tugs had been unsuccessful and that Thea II had dragged anchor and was now aground. The vessel’s Designated Person Ashore (DPA) responded by asking the master to provide the completed emergency check-off plans (ECP) for main engine failure/ grounding. In a further email, at 2015, the managers advised the master “do not ask the captain of the tugs for anything and do not sign anything”. The ECPs were completed by Thea II’s officer of the watch (OOW). Shortly after 2030 Svitzer Josephine’s master began to re-evaluate his situation. He sensed the tug’s pounding had become less intense and assessed that the tug was beginning to refloat. Aware that the tide was rising, and that the engine room fire alarm had stopped, he decided to send the chief engineer below to restart the tug’s main engines.
8 1.2.3 Recovery of Svitzer Josephine and Thea II At 2139 Thea II’s master received an email from the vessel’s managers informing him that insurance brokers were in the process of sourcing appropriate tugs to assist. At 2145, the tugs Yeoman and Irishman (Figure 5) left the main channel to approach Thea II. Shortly afterwards, Yeoman reported to VTS that the weather conditions were unsuitable to pass towlines. Figure 5: Yeoman (Hong Kong class) tug Yeoman - a Hong Kong class tug Courtesy of transportsofdelight By about 2200 Svitzer Josephine had refloated and was led into deep water by the ALB. As he manoeuvred his tug clear, the master payed out the vessel’s 130m towline until its weak link broke and the line detached from the winch. This left the tug’s towline attached to Thea II. Once clear, Svitzer Josephine returned to Immingham under its own power, escorted by Svitzer Valiant. Just before high water at 2235, VTS noted Thea II had started to drift towards the Spurn peninsula, so contacted the vessel to enquire if it was going to drop a second anchor. Thea II’s master responded, saying that he did not intend to do so as they were drifting into deep water on the other side of the Binks Shoal. At 2245, after discussion between the harbourmaster, tug skippers and the ALB coxswain, it was decided that the ALB would guide Yeoman and Irishman’s masters to the bow and stern of Thea II. The ALB led Irishman to the east of the Binks shoal to Thea II’s stern and then led Yeoman to the vessel’s bow. During Yeoman’s approach to Thea II the tug was set on to the container vessel’s anchor cable, causing some damage to its hull. By 2330, both SMS tugs were close enough to pass lines to the container vessel. Concurrently, the Humber harbourmaster updated the SOSREP on his intentions to secure the tugs to Thea II and tow it clear. At 2300, Thea II’s master emailed the vessel’s managers, stating his concern over their delay in authorising the tow. Thirty minutes later the vessel’s managers responded, informing him that they were ‘working on it’. The master continued to express his concern to them, approximately every 20 minutes, over the delay in granting him permission to take the tugs’ lines.
9 At 2337, concerned that the tide was falling and that Thea II’s crew had not taken lines from the tugs, the harbourmaster issued a special direction on VHF radio to Thea II’s master, directing him to take tugs’ lines. This direction was acknowledged by Thea II’s master, but he did not issue instructions to his crew to take lines from the tugs. Throughout the incident, Humber coastguard had kept the MCA Duty Counter- Pollution and Salvage Officer (DCPSO) updated regarding the situation. The DCPSO, in turn, kept the SOSREP apprised of the situation. The DCPSO also commissioned a model of the environmental risk posed by the grounded vessels and liaised with Thea II’s managers and insurers. The vessel’s managers and insurers were initially confident that they would be able to contract tugs to tow their vessel clear. However, at 2342, concerned that Thea II had yet to take lines from the attending tugs, Humber coastguard contacted the DCPSO, and the Humber harbourmaster was also in contact with the SOSREP. Several telephone conversations involving the DCPSO and Thea II’s managers followed. During these discussions it became clear that negotiations between SMS Towage, the tugs’ owners, and Thea II’s managers/insurers, had stalled. Thea II’s managers/insurers wanted to employ the tugs under a fixed price towage contract, while the tug owners, SMS Towage, given the extreme weather conditions and risk to their vessels, were only willing to salvage the container vessel under Lloyd’s Open Form (LOF). At 0007 on 16 December, VTS informed Thea II on VHF: “[Thea II] your position is not good. You are in a very bad position at this time, if you don’t accept the assistance from the tugs.”
10 Figure 6: Thea II’s passage, under tow, from the Binks shoal to the deep water anchorage Chart showing passage from Binks Shoal to deep water anchorage Reproduced from Admiralty Chart 0107 by permission of HMSO and the UK Hydrographic Office 0110 - Yeoman and Irishman commence tow of Thea II. Led into safe water by lifeboat 0215 - Yeoman port propeller fouled 0520 - Pullman arrives and takes over tow from Yeoman 0640 - Thea II unexpectedly deploys anchor 0911 - Thea II anchored in deep-water anchorage
11 arranged for a replacement tug, Pullman, to get underway. The harbourmaster advised the tugs to remain clear of the windfarm exclusion zone and hold their current position until the replacement tug arrived. At 0520, the replacement tug, Pullman, arrived on station and, once Yeoman had been released, took over as Thea II’s bow tug. The disabled Yeoman was left to drift safely to the north. At 0640, Thea II’s master sighted anchored vessels nearby and, thinking that his vessel had arrived at the anchorage, dropped anchor. After discussion with the tugs and VTS, Thea II quickly recovered its anchor and the tow to the deep water anchorage continued. At 0911, Thea II anchored in the deep water anchorage. Once released, Irishman proceeded north, recovered the disabled tug Yeoman and towed it back to port. Pullman remained on station until Thea II was safely towed into harbour the following day. 1.3 DAMAGE SUSTAINED 1.3.1 Thea II Once Thea II’s cargo had been discharged at Hull, the vessel was towed to Germany for repair. After the vessel had been dry docked it was found that: ● The rudder and steering gear were damaged, but operational. ● The vessel’s hull was intact, but the hull bottom paintwork was damaged. ● There was minor damage to the propeller blades. ● Two quarter deck ventilation pipes had been broken by the tug’s towline. Thea II was out of service for 6 weeks for repair. The vessel resumed its charter in February 2019. 1.3.2 Tug Svitzer Josephine Post-accident in-water survey of Svitzer Josephine revealed that the void space containing the starboard engine room vent fan had flooded. This had shorted the fan motor and probably triggered the fire alarm. The starboard weather deck door had also vibrated open during the grounding, causing water damage to the tug’s accommodation and recreational spaces. Initially it was thought that the tug’s hull and Voith Schneider propellers (VSP) were undamaged. However, during the dry-docking of the vessel in June 2019, extensive cracking was identified along the skeg and adjoining keel plating, which had not been detected during the in-water survey. 1.3.3 Tug Yeoman Yeoman’s hull was damaged when, during its approach to Thea II, it was pushed onto the container vessel’s anchor cable. Later during the tow, the tug lost the use of both engines. Yeoman was towing Thea II bow to bow, and its master initially
12 assumed that its propellers had been fouled by fishing gear. However, when Yeoman was in dry dock it was discovered that the port and starboard azimuth units had been fouled by a towline (Figure 7). The following damage was also discovered: ● The internal engine room mountings were out of tolerance. ● The starboard bilge keel and starboard side of the hull were damaged. The vessel was in dry dock for 10 weeks and returned to service in February 2019. Post-accident inspection of the rope recovered from Yeoman’s azimuth units suggests that it was an 80mm, 3-strand ‘Strongline’ polyester, Langhorst towing hawser, attached to a 15m yellow/orange towing pennant. This was similar to Svitzer Josephine’s towline, which had been discarded by Thea II’s crew. Figure 7: Yeoman’s propellers fouled by Svitzer Josephine’s towline Towline caught up in azimuth stern drives Image courtesy of SMS Towage Ltd 1.4 ENVIRONMENTAL CONDITIONS During the afternoon of 15 December, weather conditions deteriorated as forecast. At 1500, when Thea II first anchored, the wind was south-easterly force 8 accompanied by a 2-3m sea. By 1630, when Thea II began to drag its anchor, the wind had increased to storm force 10, with a 4-5m sea. However, by 2300, just after high water, conditions had begun to moderate; the wind had veered to south-south- east gale force 8 and the sea reduced to 2m. During the following morning, while Thea II was under tow, conditions improved further. The wind veered to the south and then south-west and reduced from force 6 at 0100 to force 4 at 0900. The tidal streams in the approaches to the Humber Estuary near the Binks shoal flowed south-south-west on the flood and north-north-east on the ebb tide, at rates of up to 2kts. Initially the tidal stream set north-north-east until 1800, south-south- west until midnight, before setting north-north-east again (Figure 3). Buoyant towing pennant Non-buoyant towline
13 Tides in the Humber were affected by weather conditions and, as a result, their height differed from those predicted. Normally, these variations were between 20 and 30cm. However, on 15 December, with storm force winds from the south-south- east, Spurn Head tide gauge showed the actual height of tide was between 0.9 and 1; 1m less than predicted. The seabed had a charted depth of between 0 and 10m, and the bottom composition was described as sand and shells; judged to be moderate holding ground. 1.5 THEA II 1.5.1 Crew Thea II had a crew of 11 made up of five Russian/Ukrainian officers and six Filipino crew. The 62 year old Russian master had worked at sea for over 40 years and held an STCW II/2 certificate of competency. He had completed four, 4-month contracts as master of Thea II. The master did not keep watches in harbour, but at sea kept the 0800-1200 and 2000-0000 watches. On the day of the accident, the master had been on watch as normal in the morning and had returned to the bridge at 1430 to oversee the vessel’s entry into the Humber. He then remained on the bridge throughout the incident, only returning to his cabin to rest once the vessel was towed clear of the Binks shoal. The 62 year old Ukrainian C/E had worked at sea for over 40 years and held an STCW III/2 certificate of competency. He had served as C/E of Thea II for over 13 years. The C/E, assisted by a Filipino oiler, worked during the day, adjusting his hours as required so that he could keep watch in the engine room during pilotage. 1.5.2 Vessel background Thea II had been managed by TS-Shipping GmbH & Co. KG. from build. Since March 2018 the vessel had been on time charter to Samskip, employed on a regular route between the Netherlands and the United Kingdom. Thea II’s primary means of navigation was by paper charts, supported by an electronic chart system (ECS) as a navigational aid. The vessel was also fitted with two navigational radars: Automatic Identification System (AIS) and two global positioning systems (GPS). As Thea II was less than 3000gt the vessel was not fitted with a voyage data recorder. 1.5.3 Thea II’s managers Thea II’s managers were based in Haren, Germany. At the time of the accident their office was closed for the weekend and the vessel’s DPA and safety auditor coordinated the company’s response remotely from their homes. During the accident, the DPA and safety auditor made attempts to contact Thea II’s master by mobile phone, but with no success. The master, instead, preferred all communications with the managers to be via email. After being initially informed by the master, the managers did not monitor Thea II’s position using AIS as they were under the misconception that the ship was safely anchored, awaiting tug assistance.
14 1.5.4 Anchor arrangement and guidance Thea II’s anchor arrangements comprised a forecastle windlass and two 1998kg, high holding power, D’Hone anchors (Figure 8). The port anchor was attached to 12 shackles and the starboard anchor to 9 shackles of 40mm hardened steel cable. Figure 8: Thea II’s D’Hone, high holding power anchor D'Hone high holding power anchor Image courtesy of TS-Shipping GmbH and Co. KG Thea II’s safety management system (SMS) guidance on anchoring included: ●That the OOW needs to consider the condition of the holding ground, weather and tidal conditions as well as traffic flow. ●To detect dragging, the vessel’s position should be checked frequently preferably by different methods (visual bearings, radar bearing and distance). ●If the weather deteriorates or there is a risk of dragging, inform the master and make engines ready for immediate manoeuvre. If necessary, consider lowering a second anchor. The vessel’s SMS did not provide guidance on the scope of anchor cable to be deployed. Fluke Shank
15 Thea II’s paper chart showed the vessel’s position had been fixed at 1500, 1638 and
- It also showed the depth of water on anchoring, including the height of tide
(2.3m), was approximately 12m. 1.5.5 Failure of main engine Thea II’s main engine was a MAN B&W, 2950kW, diesel engine connected via a gearbox to a controllable pitch propeller and shaft generator. The shaft generator was used while entering and leaving harbour to operate the 250kW bow thruster. The vessel was also fitted with two generators, both of which were operating at the time of the accident. Shortly before 1500 on 15 December, the C/E had been working in the engine room with the oiler when he heard the engine speed governor alarm sound. The engine revolutions slowly reduced until the shaft stopped. The C/E immediately went to investigate. He checked the fuel system but could find nothing wrong. He then inspected the governor control unit. There, he found one of the fuses had tripped, which he reset. The C/E then attempted to restart the main engine, without success. He repeated this on three or four occasions. At each attempt, the engine briefly ran before shutting down. He then spoke to the OOW on the bridge, who informed him that the ship was going to anchor. The C/E continued to investigate the main engine defect, liaising by email with the vessel’s managers. By about 1600 he had identified the problem as a defective circuit board within the electronic governor control system. A spare circuit board was not carried on board. The C/E advised the master that specialist technical support from the manufacturer would be required to repair the defect. Until then, the vessel’s main engine would be out of action. 1.6 SVITZER JOSEPHINE 1.6.1 Crew Svitzer Josephine carried a crew of three comprising the master, an OOW (deck) and the C/E, all of whom had joined the vessel at 0830 on 15 December 2018. At sea, the master conned and navigated the tug. The OOW assisted the master when required, and during towing operations worked on deck handling the towline. The C/E oversaw the safe operation of the tug’s machinery and, when towing, operated the towing winch from the wheelhouse. The 54 year old master had worked at sea for over 20 years. He had joined Svitzer tugs as an able seaman before gaining his STCW II/3 tug master’s certificate of competency in 2016. He had been working as relief master on various tugs since March 2016. Svitzer Josephine’s minimum safe manning document permitted the tug to reduce from six to three crew when operating within Humber port limits. 1.6.2 Tug background The UK registered Svitzer Josephine was owned by Svitzer Marine Ltd. It was a twin VSP tractor tug and had a bollard pull of 53t. The VSPs were protected from damage by debris or grounding by means of protective steel structures known as ‘stools’ (Figure 9). The tug was designed to tow over its stern and was fitted with a
16 towing winch that held a 130m long, 80mm diameter towline. The towline was not buoyant, however the 15m rope pennant, secured to the eye of the towline, was. Svitzer Josephine, in common with the other Svitzer tugs involved, was based at Immingham and supported shipping movements throughout the Humber Estuary. The tug’s normal area of operations confined the vessel to operating within the Humber Estuary’s navigation channels. The SMS required the master to maintain a minimum under keel clearance of 1m. Svitzer Josephine’s primary means of navigation was using paper charts. These were kept up to date by the crew and stored on the bridge within a cardboard tube for use as required. The tug was also fitted with a radar, an ECS, an echo sounder, and a GPS. During the emergency response Svitzer Josephine’s master navigated the tug using its ECS. Svitzer Josephine’s echo sounder transducer was fitted in front of its VSPs. The echo sounder’s minimum depth alarm was set at 1m. However, the position of its transducer, like many tugs, meant that it was prone to false alarm due to VSP wash and, on the day of the accident, the echo sounder’s audible warning alarm had been silenced. Figure 9: Svitzer Josephine’s underwater arrangements Skeg Towing winch Protective steel plates Position of echo sounder transducer Voith Schneider propeller
17 The company’s SMS guidance for vessels fitted with an ECS stated:
●Correctly updated paper charts must be carried covering the entire operational area.
●Paper charts must be used as primary means of navigation. The charts must be prepared & readily available (not in a drawer).
●All electronic charts used by the unofficial electronic chart system, must be kept updated in accordance with the recommended update frequency from the manufacturer/supplier of the charts and publications. On the day of the accident, the tug’s paper charts did not include BA chart 104, ‘Approaches to the Humber Traffic Separation Scheme’. This chart encompassed the area where Thea II anchored and both vessels subsequently grounded. The SMS guidance on fixing the tug’s position stated that it:
●Must be done at regular intervals.
●Must be done utilizing either the radar, visual landmarks, navigational marks or a combination.
●Must be recorded in the logbook or the chart utilized.
●If applicable the echo sounder read out must be compared with the charted depths in the electronic chart system when position fixing.
●Svitzer do not accept position fixing solely by GPS.
●Svitzer do not accept past track as a means of position fixing. 1.7 YEOMAN 1.7.1 Crew Yeoman was operated by a crew of three: a master, deckhand and an engineer. While towing, the master conned the tug, the deckhand remained on the bridge and operated the winch, while the engineer worked on deck passing and returning the towline. Yeoman was certified under The Small Commercial Vessel and Pilot Boat Code of Practice (MGN 280). The 66 year old master held a commercially endorsed Royal Yachting Association, Yachtmaster Offshore (Power Driven Craft) certificate of competency and had completed a voluntary towing endorsement. 1.7.2 Vessel background The UK registered Yeoman was operated by SMS Towage. It was 24m in length, had a 40t bollard pull and was propelled by a twin azimuth stern drive (ASD). Known locally as a ‘Hong Kong’ class tug because of its country of build, Yeoman’s towing winch was fitted to its forecastle and it was designed to primarily tow over the bow. Irishman, which was also involved in the salvage operation, was a sister vessel to Yeoman.
18 1.8 HUMBER PORT AND VESSEL TRAFFIC SERVICE 1.8.1 Overview Associated British Ports (ABP) was the Statutory and Competent Harbour Authority for the Humber Estuary, responsible for ensuring the safety of marine operations within its area. The accident took place within the port’s limits. ABP’s authority for the Humber Estuary was underpinned by legislation, which permitted the Humber harbourmaster to issue general and special directions. 1.8.2 Risk assessment ABP Humber conformed to the UK Port Marine Safety Code (PMSC) and the associated Guide to Good Practice (GTGP). As part of the code the port was required to ensure that: All marine risks are assessed and are eliminated or reduced as low as reasonably practicable. Of the port’s 43 generic risk assessments, two were relevant to this accident: ‘Equipment failure (vessel)’; and ‘Grounding: Sea to Cleeness’.
● Equipment failure (vessel). The worst credible scenario was based on equipment failure leading to loss of control of a vessel resulting in serious injuries; moderate damage to the vessel/infrastructure, with no measurable environmental impact; and, minor local media attention. Overall, vessel equipment failure was assessed as a ‘low’ risk. The most significant control measures included: the requirement for ships to declare defects prior to arrival/departure, the use of bridge resource management (BRM), harbour directions, port state inspection and pilotage.
● Grounding: Cleeness to Sea. The worst credible scenario was based on a vessel aground that could not be refloated on the same tide, which resulted in serious damage to the vessel and environment and the potential for serious injuries and serious impact on port business. Overall, grounding was assessed as a ‘medium’ risk. The most significant control measures included: aids to navigation; AIS coverage; BRM; stakeholder communication; accurate hydrographic data; passage planning; pilotage; tug availability; and VTS. 1.8.3 Accident statistics In 2018 the port recorded 28 minor incidents during 33,000 vessel moves, where vessels had suffered main engine failure while operating within the Humber port area. This equated to approximately one incident every other week.
19 In the last 20 years the port recorded four groundings in the approaches to the Humber Estuary (‘Cleeness to sea’). In each case, the vessel had been aground for only a short period, before getting underway without tug assistance. 1.8.4 Environmentally sensitive sites The Humber port area contained several environmentally sensitive sites. Thea II and Svitzer Josephine grounded in a Marine Conservation Zone3 and Special Protection Area4, which were adjacent to a Special Area of Conservation and Ramsar site5 (Figure 10). The environmental modelling, initiated by the DCPSO, showed that marine diesel or lube oil released from Thea II or Svitzer Josephine could have been deposited on to the Spurn peninsula before being swept into the North Sea. 1.8.5 Humber Estuary Serious Marine Emergency Plan The purpose of HESMEP was to provide a framework for the management of serious marine emergencies within, and close to, the Humber port area. The plan gave the harbourmaster the lead for coordinating the emergency response to incidents located within the port boundary, while the coastguard led the emergency response for those outside it. The HESMEP was exercised annually. The last exercise involving the port, the coastguard and other emergency services had been conducted a few weeks before the accident. 1.8.6 Vessel traffic services VTS Humber was located at Grimsby. It was operated as a 24-hour service and was manned at all times by three personnel: a VTS supervisor (known as the assistant harbourmaster (AHM)), supported by two VTSOs. VTS’s role was to monitor and regulate shipping within the Humber port area. The AHM and operators used a bespoke computer system, which combined data from several radar sites, vessel AIS and environmental information to produce a comprehensive picture of maritime activity within the Humber and its approaches. Charts for the VTS area were available in both electronic and paper form. The electronic chart data could be displayed on the VTSO’s computer system in simple, intermediate and detailed views (Figure 11). In most cases operators configured their display to use the uncluttered, simple view, so that they could monitor vessel traffic without distraction. 3 A Marine Conservation Zone is a type of marine nature reserve in UK waters. They are established under the Marine and Coastal Access Act (2009) and are areas designated with the aim to protect nationally important, rare or threatened habitats and species. 4 A Special Protection Area is a designation under the European Union Directive on the Conservation of Wild Birds. Under the Directive, Member States of the European Union have a duty to safeguard the habitats of migratory birds and certain particularly threatened birds. 5 A Ramsar site is a wetland site designated to be of international importance under the Ramsar Convention. The Convention on Wetlands, known as the Ramsar Convention, is an intergovernmental environmental treaty established in 1971 by UNESCO, which came into force in 1975.
20 Figure 10: Marine protected areas at Spurn Head Chart showing the prot ected areas around Spurn Head Image courtesy of Natural England
21 Figure 11: VTS display showing up to date S57 chart data Simple view on VTS display Simple view Intermediate view on VTS display Intermediate view Detailed view on VTS display Detailed view Governed by the International Association of Lighthouse Authority (IALA) regulations, VTS Humber provided vessels with the following services:
● Information Service (INS). A service that provided relevant information to vessels within the VTS area. This included vessel movements/ intentions, weather or hydrographic information, and information concerning manoeuvring limitations of vessels.
● Traffic Organisation Service (TOS). A service that coordinated vessel traffic within the VTS area to prevent dangerous situations developing.
22 VTS Humber did not provide:
● Navigation Advisory Service (NAS). This service would have provided essential and timely navigation information. It would have included the provision of navigational advice or instruction. However, the IALA is clear that VTS provision of NAS did not relieve masters of their responsibility for the safety of their vessels. To ensure VTS information and direction were understood by foreign crew, for whom English might not have been their first language, the operators were taught to use IMO Standard Maritime Communication Phrases (SMCP). A key element of SMCP was the use of specific message markers, such as the following: ‘instruction’, ‘advice’, ‘warning’, ‘information’, ‘question’, ‘answer,’ ‘request’ and ‘intention’ to ensure the significance of the message that followed was understood. All VTS Humber operators on watch at the time of the accident had completed approved IALA VTS courses appropriate for their roles. 1.8.7 Immingham Oil Terminal duty fire tug ABP Humber had contracted Svitzer Marine Ltd to provide a duty fire tug ready and equipped to respond to emergencies at either Immingham or South Killingholme Oil Jetties. The duty tug was at 10 minutes’ notice to get underway and could be contacted by VHF or emergency alarm. This contract did not commit Svitzer Marine to provide emergency towage to incidents elsewhere within the port. 1.9 GUIDANCE ON ANCHORING 1.9.1 Length of anchor cable deployed In order for the maximum holding power of an anchor to be achieved, the anchor flukes must be buried in the seabed and the shank must be pulled horizontally. If the anchor’s shank is lifted by only 5° from the seabed, then the anchor’s holding power would be reduced by 25% (Figure 12). To ensure that this does not happen the crew must deploy sufficient cable. Industry guidelines on the length of anchor cable to be deployed state that:
● the length of cable in metres must be between 6 and 10 times the depth of water; or,
● the length of cable in shackles must be greater than: Using a charted depth of 12m these guidelines indicate that Thea II’s master should have deployed between 2.6 and 5.2 shackles of cable. When Thea II initially anchored, 5 shackles of cable were deployed, which was increased to 6 shackles once the vessel started to drag its anchor. These guidelines recommend that in bad weather additional anchor cable be deployed. Furthermore, in strong winds, high-sided vessels like Thea II, with containers stowed on deck, can be prone to yaw either side of their anchor cable. At the extremity of each yaw, the vessel would snatch at the cable, placing it under
23 Figure 12: Scope of deployed anchor considerable load and increasing the risk of the anchor breaking free and dragging. Thea II was yawing approximately 35° either side of its cable immediately prior to dragging its anchor. 1.9.2 Use of a second anchor A method to reduce the likelihood of dragging anchor in bad weather is to deploy a second anchor (Figure 13) 6, by either:
● Dropping a second anchor ‘underfoot’. Employing this method, the second anchor is deployed with sufficient cable to just touch the seabed. The drag provided by the second anchor ‘underfoot’ slows the vessel’s rate of yaw, reducing the likelihood of the other anchor breaking free and dragging. Or
● Deploy a second anchor with a similar length of cable to the first. However, this method is suitable only when the vessel is expected to be at anchor for a short period of time. If the vessel swings, due to wind or tide, its cables will become fouled and can be difficult to untangle when the anchors need to be recovered. For this reason, many mariners are reluctant to deploy a second anchor in this manner. 1.10 THE ROLE OF THE SECRETARY OF STATE’S REPRESENTATIVE The SOSREP’s role, as described in the UK National Contingency Plan (NCP), is to represent the Secretary of State for Transport by removing/reducing the risk to safety, the environment and property, arising from a maritime accident. In support of the NCP, the SOSREP regularly engages directly with UK port authorities, as well as harbour and towage industry associations. When possible, SOSREP is also involved in exercises undertaken by ports and the UK coastguard where pollution and salvage responses are tested. 6 Admiralty Manual of Navigation volume 1. Sand and shells An anchor provides max holding power when its flukes are fully embedded, and its shank lies on the sea bed. If the shank is lifted by 5º the holding power will be reduced by 25%.
24 Figure 13: Use of the second anchor 35 35 1 1 2 2 3 3 4 Dropping second anchor underfoot Dropping a second anchor 1st anchor (maximum length of cable) Preferred ‘let go’ position for 2nd anchor (underfoot) 1st anchor 2nd anchor ‘Let go’ position for 1st anchor Alternative ‘let go’ position for 2nd anchor (underfoot) ‘Figure-of-eight’ yawing pattern reduced by second anchor being dropped off under foot ‘Let go’ position for 2nd anchor
25 The UK NCP states that, when an accident takes place within a harbour area, the SOSREP will monitor the situation and tacitly approve the harbour authority’s response to actions. However, the SOSREP can intervene and use his powers in support of the harbourmaster if required. The SOSREP’s powers, defined in the Merchant Shipping Act 1995, include being able to issue the following:
● An initial caution. This is normally issued by the coastguard or the DCPSO where the actions of the master/owners have been unsuccessful, advising them that, under UK law, the SOSREP has the power to order the vessel to take a tug or accept tug assistance. The caution warns the master/owner that if they fail to make adequate arrangements for assistance, the SOSREP will formally direct action and recover the costs from them.
● Formal direction. The SOSREP can issue a formal direction ordering the vessel to accept tug assistance. If the vessel fails to do so, then not only will action be taken to recover costs from the owners, but also the owners/ master will have committed a criminal offence under UK law and be subject to prosecution. The SOSREP’s initial caution and formal direction would be issued by VHF radio, followed up with an email. There is no requirement to issue an initial caution prior to issuing a formal direction; similarly, an initial caution can be issued without the need to escalate it to a formal direction. In this case, while no initial caution had been issued, the DCPSO had informed the vessel’s managers and insurers that if Thea II did not take lines from the tugs by 0100 on 16 December, the SOSREP would issue a formal direction for the vessel to do so. 1.11 THE ROLE OF THE DUTY COUNTER-POLLUTION AND SALVAGE OFFICER The MCA’s counter-pollution and salvage branch has specific responsibility for counter-pollution preparedness and response at sea, as well as management of the UK’s stockpile of equipment and dispersant. Members of the team keep week-long duties as the DCPSO, coordinating the national response to marine incidents in UK waters that have the potential to result in pollution or salvage. As part of their role they have the authority to liaise with the SOSREP and other stakeholders as required. 1.12 TOWAGE AND SALVAGE CONTRACTS Thea II’s managers/insurers had two contractual options for negotiating the towage of their vessel to a place of safety: a contract tow or LOF. Negotiation of a contract tow is often based on Baltic and International Maritime Council (BIMCO) standard towage contracts. These allow the towage contract to be drawn up, using a proforma. The payment is based on a daily charter fee, paid for by the vessel’s managers/insurers on completion of the tow.
26 In contrast, LOF, the standard contract for marine salvage, does not specify the sum paid to salvors. Instead, based on the principle of ‘no cure no pay’, it requires salvors to use their ‘best endeavours’ to recover the ship to a place of safety in order to receive payment. LOF can be agreed over VHF and allows the salvage to start quickly without the salvors, insurers and owners having to negotiate contractual terms. Where salvage is successful, the renumeration awarded under LOF is intended to incentivise salvors to respond to stricken vessels. However, while the scale of the reward is likely to be considerably larger than that received for a contract tow, it is often paid many months after the event following arbitration. 1.13 SIMILAR ACCIDENT On 18 December 2018, the Russia registered bulk carrier Kuzma Minin grounded after dragging its anchor in Falmouth Bay, England. The vessel was in ballast and was successfully refloated on the next high water. There was minor damage to the vessel and there were no injuries or pollution. The MAIB investigation (Report 11/2019) identified that the vessel dragged anchor in wind speeds of over 50kts. The vessel’s movement was quickly detected by the crew and the master attempted to get the vessel underway. However, the anchor was fouled by a chain and, while the crew attempted to clear this, the vessel was blown ashore. Following the accident, the port strengthened existing measures to check visiting vessels have protection and indemnity insurance, and to improve the safety of vessels at anchor in Falmouth Bay. A recommendation was made to the vessel’s owner aimed at ensuring its vessels are appropriately resourced and meet the requirements of international conventions.
27 SECTION 2 - ANALYSIS 2.1 AIM The purpose of the analysis is to determine the contributory causes and circumstances of the accident as a basis for making recommendations to prevent similar accidents occurring in the future. 2.2 OVERVIEW While approaching the Humber pilot station, the container feeder vessel Thea II suffered an engine failure that could not be immediately repaired and which meant that the vessel had to anchor in gale force conditions. The master had no choice but to ask for tug assistance to enter port. While at anchor the winds increased to storm force, leading to Thea II dragging its anchor as insufficient chain and no second anchor were deployed. Subsequently, while trying to establish a tow, both Svitzer Josephine and Thea II grounded on the Binks shoal. The tug grounded because its master, focused on securing a towline, lost positional awareness and did not fully appreciate the drift rate of the two vessels. The delays in Thea II securing a tow after refloating were due to the managers’ lack of awareness of the vessel’s situation. Despite numerous emailed requests by Thea II’s master, and a special direction issued by the Humber harbourmaster instructing him to secure tug towlines, it was only the threat of intervention by SOSREP that persuaded the managers to take action to prevent their vessel re-grounding in an environmentally sensitive area. 2.3 THEA II – GROUNDING 2.3.1 Main engine failure Thea II, which was 23 years old, was a well-maintained vessel with a reputation for being mechanically reliable. Its C/E, with over 13 years’ experience on board, was able to quickly identify the engine defect. This revealed that Thea II had lost propulsion due to the failure of its main engine governor circuit board. Without a replacement component, the engine could not be repaired. Thea II did not carry a spare circuit board, as such a repair would normally be carried out by service engineers. Consequently the master had no option but to anchor his vessel and summon assistance. 2.3.2 Thea II dragging anchor Thea II maintained its position for almost 90 minutes, lying to its port anchor with 5 shackles of cable in the water. The master believed that his vessel would be at anchor for only a short period awaiting the arrival of tugs; the amount of cable he had deployed reflected this. However, as the wind increased to storm force 10, the vessel started to yaw, and shortly afterwards began to drag its anchor. The master’s response was to deploy a further shackle of cable.
28 This was unsuccessful in stopping the anchor dragging, and Thea II continued to drift towards the Binks shoal at 1.7kts. The weather conditions were now extreme and, while they exceeded the International Association of Classification Societies’ (IACS) design threshold for the vessel’s anchor,7 the master still had several options to arrest or slow Thea II’s drift towards the shore. The first option was to deploy all remaining cable on the port anchor. Thereafter the master could also, as the vessel’s SMS advised, have deployed the starboard anchor, either ‘underfoot’, or as a second anchor. Had the master taken any of these actions they might have stopped, or at least reduced Thea II’s rate of drift towards the Binks shoal. Had the vessel’s rate of drift been reduced by 0.5kt, it would have allowed the tugs a further 25 minutes to secure lines and tow Thea II to safety. The master was reluctant to drop a second anchor because, like many mariners, he was concerned that the two anchor cables would become entangled. In addition, at 1505 the VTSO had advised Thea II not to drop a second anchor because it might have hampered or prevented the vessel from securing tugs. Therefore, while it is unsurprising that Thea II dragged its anchor in such severe weather conditions, the master could have taken further action to slow or arrest the vessel’s drift. Moreover, the additional time gained might have been sufficient for the tugs to attach their lines and prevent the vessel from grounding. 2.4 SVITZER JOSEPHINE – GROUNDING 2.4.1 Master’s appreciation of risk Svitzer Josephine’s master left Immingham expecting to tow a disabled ship, anchored by the side of the main channel, into harbour. Yet, while on passage downriver the task changed to intercepting and towing to safety a disabled vessel that was dragging its anchor towards shallow water. As the tug rounded Spurn Head, the master began to appreciate the severity of the weather and the challenge associated with passing a towline to the disabled vessel. His VHF conversations with VTS indicate that he was unsure as to whether to proceed. However, with the AHM’s assurance, he decided to attempt to secure a towline, as his vessel and Svitzer Castle were the only assets available to prevent Thea II from grounding. The task faced by Svitzer Josephine’s master was unusual. Routinely employed in harbour towage, the master was more accustomed to operating in the familiar waters of the Humber Estuary, under the direction of a ship’s master or harbour pilot. However, on this occasion Svitzer Josephine had left its normal area of operation and was proceeding independently, making a challenging night time approach, in storm force conditions, to assist a disabled vessel. As the master turned the tug to make the approach to Thea II’s starboard shoulder, his crew of three were fully occupied. The OOW was on deck passing the towline to the container vessel and the engineer was operating the towing winch. The master was manoeuvring the tug, monitoring the activity on the upper deck of both vessels, while occasionally glancing at the tug’s navigational equipment (radar, ECS and echo sounder). It was therefore unsurprising that he lost positional awareness and had not seen that both vessels would shortly ground on the Binks shoal. 7 IACS required anchor equipment to moor the vessel up to 135m in length in winds up to 25m/s (49.6kts) and currents up to 2.5m/s (4.9kts).
29 The guidance on the conduct of a tug’s navigation in Svitzer’s SMS was detailed but did not match day to day practice. Svitzer Josephine was fitted with an ECS, and the crew were therefore obliged to use paper charts as the primary means of navigation. However, chart work was not a routine activity on board the tug, and the paper charts therefore remained in the storage tube. Instead, Svitzer Josephine’s master relied on his knowledge and experience to keep the vessel navigationally safe. Ordinarily, a further safeguard was that, when tugs were towing larger, deeper vessels, the pilot or master of those vessels would help keep the tugs navigationally safe by ensuring that the vessel they were piloting did not ground. Even if BA chart 104 had been on board, given that all three of the crew were fully occupied the use of paper charts to plot and monitor the tug’s position was impracticable. The echo sounder alarm, prone to false alarm, had been silenced and, while it would have indicated the approaching shoal, neither the master nor the OOW were visually monitoring it. Svitzer Josephine’s master did not fully appreciate the level of risk he was exposing his vessel to when he took the tug out of the main channel to attend Thea II. He did not have a passage plan to keep his vessel safe from grounding or an effective method of monitoring his position. The tug grounded because the master became task focused on passing the towline to Thea II, lost positional awareness and did not appreciate the rate of drift of either the casualty vessel or his own tug towards the Binks shoal. 2.4.2 Vessel Traffic Services Humber’s advice Until the harbourmaster took over at 1900, VTS Humber led the port’s response to this accident. The VTSOs were quick to spot that Thea II had lost propulsion, and identified when the vessel started to drag its anchor. However, as the disabled container vessel began to drag its anchor at 1.7kts towards the Binks shoal, their advice became less helpful. In particular, when Svitzer Josephine’s master weighed up the risk of leaving the fairway to provide assistance to Thea II, the VTSO was keen that he should assist the casualty. He even offered to “keep an eye” on the tug, letting it know if it “got too close to the bank”. In effect, VTS staff went beyond their remit of providing an information and traffic service, tacitly offering the tug navigation advice, albeit caveated by the statement that they did not have a chart. In the event, VTS staff provided no warning to Svitzer Josephine before the tug grounded. ABP Humber’s new VTS facility at Grimsby was state of the art, and combined meteorological, tide, radar and AIS information, all of which could be displayed alongside the latest chart data. The AHM and his VTS team had the tools necessary to estimate the time of Thea II’s grounding. Had they done so, and had they shared this information with Svitzer Josephine, it might have prompted the tug master to move his vessel to deeper water and prevent his vessel grounding. While it might not have been appropriate for the VTSOs to provide the tug with direct navigational advice, they could have used the SMCP message markers ‘caution’ or ‘warning’ to alert both vessels to the approaching shoal. While responsibility for the safety of the tug rested with its master, timely advice from VTS Humber might have prompted him to take action to prevent his vessel grounding.
30 2.5 SALVAGE OF THEA II 2.5.1 Emergency response by ABP Humber Once Thea II and Svitzer Josephine were aground, ABP initiated HESMEP. The harbourmaster, who had been briefed on the accident by phone, arrived at the MRC at about 1900 and took over control of the port’s emergency response. His initial concern was for the safety of those on board the two grounded vessels. The RNLI ALB and SAR helicopter were deployed. However, by 1930, having established that neither master wished to evacuate his crew, the harbourmaster’s priority had shifted to minimising risk to the environment. To do this he needed to expedite the salvage of both vessels before they grounded again as the tide fell. As the tide rose Svitzer Josephine refloated and returned to harbour under its own power. However, Thea II remained aground. The harbourmaster’s challenge was that, while he held the legal responsibility for managing emergencies within the port, he had no direct control of any salvage assets, such as tugs, to recover Thea II. Strictly speaking ABP’s IOT fire tug agreement only contracted Svitzer tugs to support emergencies at Immingham and South Killingholme terminals. While the statistics of machinery breakdowns in ABP Humber’s area would suggest this lack of salvage assets would be a concern, in practice these breakdowns had always been resolved, without external assistance to the vessel’s crew. With a Svitzer tug aground, the harbourmaster commenced discussions with one of the other tug operators, SMS Towage Ltd, to establish whether they had any assets that could assist. This led to their shallow draught Hong Kong class tugs being deployed to assist the casualty. He also requested that the coxswain of the RNLI ALB use his vessel’s echo sounder to survey the water around Thea II so that the tugs could be safely guided into position when they arrived at the scene. Concurrently, he kept the SOSREP and other stakeholders apprised of developments, as best practice would dictate. The harbourmaster’s plan was put into place. By 2330 Thea II was afloat, with two tugs close enough to pass lines and tow the vessel clear. However, with the tide falling there was now an urgent need to tow the casualty vessel into safe water. The only option available to the harbourmaster was to use his statutory powers to issue a special direction ordering Thea II’s master to take the tugs’ lines. Even then, Thea II’s master refused to do so until he had received his manager’s approval. By transmitting the special direction to the master solely by VHF radio, its legal significance might not have been fully appreciated. Had it been backed up by email to Thea II, its agent, managers and insurers might all have better understood the status and importance of the harbourmaster’s special direction. Furthermore, the master, whose first language was not English, and German managers who, by this stage, were controlling the decision whether to take tug’s lines, would have both received the same message. Given the assets available, ABP Humber’s emergency response to the grounding of both vessels was well managed. The harbourmaster correctly assessed that if Thea II was not towed clear during this tidal cycle, there would have been a significant risk of the vessel grounding on the Spurn peninsula, with the increased likelihood of environmental damage to several environmentally sensitive sites. The harbourmaster used his power of special direction appropriately and, when
31 unsuccessful, engaged with the SOSREP to ensure the timely removal of the casualty. In future, to guarantee that harbourmasters’ special directions are fully understood by all parties, the port should consider reiterating significant VHF communications by email. This would help ensure that key decision makers, who might not be on board the vessel, understand the significance of the direction given and the gravity of the situation. 2.5.2 Emergency response by Thea II’s managers The initial emails from Thea II’s master to the vessel’s managers, insurers and agent advised them that the crew were unable to repair the engine defect and that the vessel was at anchor awaiting tugs to tow it into harbour. In these initial emails, the master did not inform the company of the severe weather conditions, or that the vessel was dragging its anchor. In return, the company advised the master that: “Towage is the worst option always! …all officers have to know. If towage is requested, then you have to ask insurance broker always first!!!” Shortly after receiving the advice above, the master informed the company that Thea II was aground. Having been unable to speak to the master by phone, the DPA’s appreciation of the vessel’s situation was limited by the master’s brief emails. As a result, believing there was plenty of time, his advice to the master was not to ask for assistance from tugs, nor sign LOF, while the insurance brokers sourced suitable towage assets to recover the vessel. As high water approached, the master’s emails became more urgent. He repeatedly asked Thea II’s managers for their intentions to tow his vessel to safety. Once Thea II was afloat, the frequency of the master’s requests for advice increased and the tone of his emails became more anxious. These email exchanges indicate that the managers still did not fully appreciate their vessel’s predicament. They were unaware of the exact location of the grounded Thea II, the severity of the weather, and the limited tidal window available to recover their vessel. They were also unaware that Thea II was aground in an environmentally sensitive area. In part, this was due to the limited detail contained in the master’s concise emails and a lack of verbal communication directly with the master. However, it was also as a result of Thea II’s managers’ focus on the commercial aspects of the tow, at the expense of them seeking a detailed understanding of their vessel’s situation. It was difficult to gain such an understanding while operating from home, without access to a full set of navigational publications that would have been available in their office. A further issue that delayed Thea II’s salvage was the managers’ instruction to the master not to engage tugs, nor sign LOF, without their permission. This approach undermined the master’s authority. When the harbourmaster issued his special direction, Thea II’s master, aware of his vessel’s precarious situation, wanted to take tugs’ lines but did not feel empowered to do so. He was very conscious that the tide was falling and, unless his vessel was under tow by approximately 0130, it was likely that Thea II would re-ground. Furthermore, the only tugs close enough to assist were Yeoman and Irishman, already at the scene. However, despite the master’s repeated requests, the managers took a further 1 hour 24 minutes before they granted approval for Thea II to take tugs’ lines; a delay that meant the ship was towed clear of the bank with an estimated 20 minutes to spare before it would have re-grounded.
32 For Thea II’s managers, this accident probably presented them with one of the most demanding emergency situations that they had faced. Unable to speak to the master by phone, they had to gather as much information as possible about their vessel’s situation from the master’s brief emails, but they did not seek out other information sources such as AIS or local information. Their priority was agreeing the best possible terms with tugs and salvors without fully appreciating the full situation faced by the crew of Thea II. They had to balance the safety of the crew, marine environment and the ship and cargo. To successfully do so required a well- established and exercised emergency response organisation that had as much information as possible at its disposal. In this case, their organisation, operating remotely, did not grasp the seriousness of the situation, the need for urgent action, or the potential environmental risk posed by their vessel. 2.5.3 Emergency response by the SOSREP and the DCPSO Humber coastguard kept the DCPSO informed of Thea II’s situation throughout the incident. When it became clear that, despite direction Thea II had not taken tugs’ lines, the DCPSO began to actively lobby the vessel’s owners/insurers to persuade them to take urgent action to safeguard their vessel. These discussions culminated with the DCPSO informing Thea II’s insurers that if the vessel had not taken tugs’ lines by 0100 on 16 December, the SOSREP would issue a ‘formal direction’ for the vessel to do so. The DCPSO’s approach followed the intent of the UK NCP. This required the harbourmaster to take the lead for managing accidents within their port area, keeping the SOSREP informed so that he could tacitly approve the actions being taken. However, when the harbourmaster’s special direction failed to elicit the required response, the DCPSO’s threat that the SOSREP would intervene had the desired effect, causing the insurers to agree that the container vessel should be salvaged under LOF. The DCPSO’s threat of action by SOSREP worked and ultimately ensured that Thea II was towed clear into safe water. Importantly, this accident and the grounding of Kuzma Minin (see 1.13.2), demonstrate the importance of SOSREP’s regular engagement with the ports’ industry and other stakeholders to promote his role in counter-pollution and salvage operations around the United Kingdom coast. 2.6 THE TOW TO THE ANCHORAGE At approximately 2200, Svitzer Josephine jettisoned its tow and got underway. This left Thea II with 130m of heavy, 80mm towline attached to its forecastle, which needed to be cleared before Yeoman’s line could be made fast. Having examined the 43m of towline recovered from Yeoman’s propellers, it appears that Thea II’s crew attempted to recover Svitzer Josephine’s hawser. However, having brought the first 43m on board, the crew made the decision to cut and jettison the remaining 87m. Subsequently, as conditions moderated once Thea II was clear of the Binks, the crew made the decision to dispose of the remaining 43m of towline.
33 This remnant of the towline was probably thrown overboard just before 0200. While the 80mm hawser sank, the buoyant 15m messenger did not, and it was drawn into Yeoman’s propellers. This caused the tug to lose the use of both its ASDs. Fortunately, Irishman was able to control the tow until the tug Pullman arrived on scene and took over the tow from the disabled Yeoman. Emergencies require rapid decisions to be taken, the consequences of which are often not fully understood at the time. In this case, Svitzer Josephine’s towline being jettisoned by Thea II’s crew disabled Yeoman and almost undermined the integrity of the towing operation to salvage the vessel. Had Thea II’s crew made a proactive decision to recover the towline on board, instead of simply jettisoning it, the disabling of Yeoman could have been avoided.
34 SECTION 3 - CONCLUSIONS 3.1 SAFETY ISSUES DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS
Thea II lost propulsion due to the failure of its main engine governor central processing unit. [2.3.1]
Thea II’s crew could not repair the main engine. As a result, Thea II’s master had no choice but to anchor and request tug assistance. [2.3.1]
It was unsurprising that Thea II dragged its anchor in the severe weather conditions. However, had Thea II’s master deployed a second anchor and/or increased the scope of the anchor already deployed, it would have slowed, and might have arrested the vessel’s rate of drift towards the Binks shoal, allowing more time for a tug to secure a towline. [2.3.2]
While VTS Humber had earlier advised Thea II not to deploy a second anchor, it was the master’s concern - that a second anchor would become entangled with the first - that resulted in his decision not to deploy the starboard anchor. [2.3.2]
Svitzer Josephine’s master did not fully appreciate the level of risk he was exposing his vessel to when he took the tug out of the main channel to attend Thea II. [2.4.1]
Svitzer Josephine grounded because the master, focused on passing the towline to Thea II, lost navigational positional awareness and did not appreciate the rate of drift of both vessels towards the Binks shoal. [2.4.1]
The assistant harbourmaster and his VTS team had the tools necessary to estimate the time of Thea II grounding. Had they done so, this would have allowed the time available to secure Svitzer Josephine to be calculated, enabling a more informed decision or additional precautions to be taken. [2.4.2]
While responsibility for the safety of the tug rested with its master, timely advice from VTS Humber might have prompted him to take action to prevent Svitzer Josephine grounding. [2.4.2]
The harbourmaster correctly assessed that if not towed clear during this tidal cycle, it is likely Thea II would have been blown on to the Spurn peninsula, risking potential damage to several environmentally sensitive sites. [2.5.1]
The harbourmaster used his powers of special directions appropriately and, when Thea II did not take the tugs’ lines, successfully engaged the Secretary of State’s Representative to ensure Thea II was towed into safe water. [2.5.1]
Transmitting the harbourmaster’s special direction by email, as well as by radio, to Thea II’s master, agent and managers would have ensured that all of the key decision makers understood the significance of the direction, the gravity of the situation and the need to take urgent action. [2.5.1]
The vessel’s managers’ instruction to Thea II’s master, not to take tugs’ lines without their prior approval, undermined his authority to act in the best interest of his ship and crew. [2.5.2]
35
It is estimated that Thea II was only 20 minutes from re-grounding on a falling tide when the vessel’s managers agreed that the master could accept a tow under Lloyd’s Open Form. [2.5.2]
Thea II’s managers, operating remotely from home, did not fully appreciate the seriousness of the situation, the need for urgent action, or the environmental risk posed by their vessel. [2.5.2]
The duty counter-pollution and salvage officer’s threat of action by the Secretary of State’s Representative worked, and ultimately ensured that Thea II was towed clear into safe water. [2.5.3] 3.2 OTHER SAFETY ISSUES NOT DIRECTLY CONTRIBUTING TO THE ACCIDENT8
The remnant of the towline discarded by Thea II’s crew, subsequently fouled the tug Yeoman’s propellers, disabling it. Fortunately, Irishman was able to control the tow until the tug Pullman replaced Yeoman. [2.6] 8 These safety issues identify lessons to be learned. They do not merit a safety recommendation based on this investigation alone. However, they may be used for analysing trends in marine accidents or in support of a future safety recommendation
36 SECTION 4 - ACTIONS TAKEN ABP Humber has:
● Conducted an internal investigation into this accident.
● Reviewed relevant risk assessments.
● Ensured local tugs are carrying relevant charts.
● Reviewed:
○Fire tug arrangements; and,
○The Memorandum of Understanding between ABP and the Humber coastguard. Svitzer Marine Ltd has:
● Conducted an internal investigation into this accident and delivered several recommendations to:
○Review the use of echo sounder and electronic chart systems.
○Improve the governance of, and preparation for, ‘special service’ and ‘non- routine’ towing operations.
○And it has reiterated the requirement to produce passage plans when operating outside the tug’s normal area of operations. TS-Shipping GmbH & Co. KG. has:
● Reviewed the safety critical engine spares carried on Thea II with the engine manufacturer.
37 SECTION 5 - RECOMMENDATIONS TS-Shipping GmbH & Co. KG. is recommended to: 2020/128 Review the company’s emergency response organisation and procedures with the aim of improving decision making and the clarity of advice provided to its vessels. Safety recommendations shall in no case create a presumption of blame or liability
Marine Accident Report
FD06064 | 2020_英国_man-overboard-from-dredger-cherry-sand-with-loss-of-1-life__2020-9-CherrySand-Annexes.pdf
分类:06_境外及港澳台调查报告 | 年份:2020 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
Annex A Extracts from the Merchant Shipping Notice 1886 (M+F) Maritime Labour Convention, 2006 Work in Fishing Convention, 2007 (ILO No. 188) Medical Examination System: Appointment of Approved Doctors and Medical and Eyesight Standards
Relationship with the Merchant Shipping (Maritime Labour Convention) (Medical Certification) Regulations 2010, as amended The MLC 2010 Regulations need to be read in conjunction with this Merchant Shipping Notice, as it sets out some of the key details which supplement the legal obligations in those Regulations. Failure to comply with those obligations may be a criminal offence under the Regulations. In order to assist with this Paragraph 8 contains an index which clearly sets out and/or identifies the provisions in this Notice which relate to the relevant provision in the Regulations. Relationship with the Merchant Shipping (Work in Fishing Convention) (Medical Certification) Regulations 2018 The FV 2018 Regulations need to be read in conjunction with this Merchant Shipping Notice, as it sets out some of the key details which supplement the legal obligations in those Regulations. Failure to comply with those obligations may be a criminal offence under the Regulations. In order to assist with this Paragraph 9 contains an index which clearly sets out and/or identifies the provisions in this Notice which relate to the relevant provision in the Regulations.
- Introduction
- 1 The Merchant Shipping (Maritime Labour Convention) (Medical Certification) Regulations
2010, (referred to in this Notice as “the MLC 2010 Regulations”) and the Merchant Shipping (Work in Fishing Convention) (Medical Certification) Regulations 2018 (“the FV 2018 Regulations”) implement the medical certification provisions of the Maritime Labour Convention 2006 and the ILO Work in Fishing Convention (No. 188) for the UK. 1.2 They also implement, for merchant seafarers, the requirements of clause 13 of the Social Partners’ Agreement set out in the Annex to Council Directive 1999/63/EC of 21 June 1999 (the Seafarers’ Working Time Directive)1. 1.3 The provisions set out in this notice also comply with Regulation I/9 and Standard A.I/9 of the IMO’s International Convention on Standards of Training, Certification and Watchkeeping (STCW), to which the UK is a signatory and the International Convention on Standards of Training, Certification and Watchkeeping for Fishing Vessel Personnel (STCW(F), which the UK has not yet ratified. Terminology 1.4 In this notice, 1.4.1 the fisherman or seafarer being examined or in respect of whom a decision is made about their fitness to work at sea or to fish is referred to as “the candidate”; 1.4.2 “Ship” includes “fishing vessel”. 1.4.3 “Master” includes skipper. 1.4.4 “go to sea”, “sea service” etc includes work on a fishing vessel regardless of area of operation. 1 As amended by Council Directive 2009/13/EC. The requirements of the remaining clauses of that Agreement, relating to hours of work, are implemented separately in the Merchant Shipping (Maritime Labour Convention) (Hours of Work) Regulations 2018.
- 4 Eyesight Standards
- 4.1 The Approved Doctor must also ensure that the candidate meets the visual acuity
and colour vision Standards. The UK’s Standards for visual acuity comply with the international standards laid down in the IMO Convention on the Standards of Training, Certification and Watchkeeping (STCW 78 as amended). Candidates will be tested for each eye separately and must meet both the higher standard required with visual aids (where needed), and a minimum standard without visual aids, in order to ensure that in an emergency they have adequate vision to carry out emergency procedures safely. For colour vision, candidates are screened using Ishihara plates. It is essential that candidates applying for Certificates of Competency as deck or dual career (merchant/fishing) officers have full colour vision. 3.4.2 A deck applicant who fails the Ishihara plate test may arrange for their colour vision to be re-tested at an MCA approved CAD test centre (listed at Annex B). The CAD test centre will charge a fee for the CAD test, which is payable directly to the test centre. Failure in this test will mean that a medical certificate may only be issued with a restriction precluding lookout duties at night. Trainee Deck officers however will be made permanently unfit. Other deck candidates applying for their first MCA Certificate of Competency (CoC), Able Seafarer Deck Certificate of Proficiency or Rating Certificate who have failed the Ishihara plate test will only be considered if they have subsequently passed the MCA Holmes Wright B (HWB) lantern test or CAD test and hence carry no restriction on their seafarer medical certificates precluding lookout duties. Existing deck seafarers who have failed the Ishihara plate test but passed the MCA HWB lantern test and have evidence of this will still be considered to meet the colour vision standards and do not need to undertake a CAD test. Existing deck seafarers who have failed the Ishihara plate test and passed the HWB lantern test but do not have evidence of this will need to take the MCA CAD test. If they do not take the test, or fail it, they may continue working in their current roles. They will be given an ENG 1 noting that they do not meet the colour vision standards with an appropriate restriction. Existing deck seafarers who wish to qualify for an MCA CoC for the first time, or a higher CoC, will have to meet the colour vision standards (i.e. Ishihara plates or MCA CAD test passed, or provide evidence that they have previously passed the MCA HWB lantern test). Their seafarer medical certificate must not have any restriction on lookout duties.
Table - SUMMARY OF STANDARDS REQUIRED Category of Seafarer Basic Visual Acuity Standard (unaided) Higher Visual Acuity Standard (aided if necessary) Near Vision (both eyes together aided or unaided) Colour Vision Visual Field Deck or dual career Better eye 6/60 Other eye 6/60 Better eye 6/6 Other eye 6/12 N8 Ishihara or CAD No pathological field defect Engineer/ Radio 6/60 6/18 6/18 N8 Ishihara or Farnsworth D15 or City University Sufficient to undertake duties efficiently Others Sufficient to undertake duties efficiently Those who become monocular in service with no evidence of progressive eye disease in the remaining eye Deck
6/60
6/6
N8 Ishihara or CAD No pathological field defect Eng/Radio
6/60
6/9
N8 Ishihara or Farnsworth D15 or City University Sufficient to undertake duties efficiently Others Sufficient to undertake duties efficiently There should be a sufficient period of adaptation after becoming monocular to enable stairs to be descended rapidly and safely. Notes 1. No diplopia, congenital night blindness, retinitis pigmentosa or any other serious or progressive eye disease is permitted. 2. If bifocal glasses are worn there should be a period of adaptation first because of the risk of falls. 3. Where glasses or contact lenses are needed to meet the vision standard, a spare pair (distance and near vision if necessary) should be carried. 4. Aids to colour vision e.g. red-tinted x-chroma, chromas lenses and chromagen lenses are not permitted. 5. Seafarers who suffer pathological field defects should have a field of vision at least 120o in the horizontal measured by the Goldman perimeter using the iii/4 setting (or equivalent perimetry). In addition there should be no significant defect in the binocular field which encroaches within 20o of fixation above or below the meridian. Homonymous or bitemporal defects which come close to fixation whether hemianopic or quadrantopic are not accepted.
MSN 1886(M+F) Appendix 2 to Annex A Table - GUIDANCE ON ASSESSMENT OF MINIMUM ENTRY-LEVEL AND IN-SERVICE PHYSICAL ABILITIES FOR SEAFARERS Shipboard task, function event or condition 3 Related physical ability A medical examiner should be satisfied that the candidate4 Routine movement around vessel: – on moving deck – between levels – between compartments Maintain balance and move with agility Climb up and down vertical ladders and stairways Step over coamings (e.g. Load Line Convention requires coamings to be600 mm high) Open and close watertight doors Has no disturbance in sense of balance Does not have any impairment or disease that prevents relevant movements and physical activities Is, without assistance 5, able to: – climb vertical ladders and stairways – step over high sills – manipulate door closing systems Note 1 applies to this row Routine tasks on board: – use of hand tools – movement of ship’s stores – overhead work – valve operation – standing a four–hour watch – working in confined spaces – responding to alarms, warnings and instructions – verbal communication Strength, dexterity and stamina to manipulate mechanical devices Lift, pull and carry a load (e.g. 18 kg) Reach upwards Stand, walk and remain alert for an extended period Work in constricted spaces and move through restricted openings (e.g. SOLAS requires minimum openings in cargo spaces and emergency escapes to have the minimum dimensions of 600 mm × 600 mm – SOLAS regulation 3.6.5.1) Visually distinguish objects, shapes and signals Hear warnings and instructions Give a clear spoken description Does not have a defined impairment or diagnosed medical condition that reduces ability to perform routine duties essential to the safe operation of the vessel Has ability to: – work with arms raised – stand and walk for an extended period – enter confined space – fulfil eyesight standards (table A–I/9) – fulfil hearing standards set by competent authority or take account of international guidelines – hold normal conversation Note 1 applies to this row Emergency duties 6 on board: – Escape – Firefighting – Evacuation Note 2 applies to this row Don a lifejacket or immersion suit Escape from smoke-filled spaces Take part in firefighting duties, including use of breathing apparatus Take part in vessel evacuation procedures Does not have a defined impairment or diagnosed medical condition that reduces ability to perform emergency duties essential to the safe operation of the vessel Has ability to: – don lifejacket or immersion suit – crawl – feel for differences in temperature – handle firefighting equipment – wear breathing apparatus (where required as part of duties) Notes to the table:
- Rows 1 and 2 describe: (a) ordinary shipboard tasks, functions, events and conditions; (b) the corresponding
physical abilities which may be considered necessary for the safety of a seafarer, other crew members and the ship; and (c) high-level criteria for use by medical practitioners assessing medical fitness, bearing in mind the different duties of seafarers and the nature of shipboard work for which they will be employed.
- Row 3 describes: (a) ordinary shipboard tasks, functions, events and conditions; (b) the corresponding physical
abilities which should be considered necessary for the safety of a seafarer, other crew members and the ship; and (c) high-level criteria for use by medical practitioners assessing medical fitness, bearing in mind the different duties of seafarers and the nature of shipboard work for which they will be employed.
- This table is not intended to address all possible shipboard conditions or potentially disqualifying medical
conditions. Parties should specify physical abilities applicable to the category of seafarers (such as “Deck officer” and “Engine rating”). The special circumstances of individuals and for those who have specialized or limited duties should receive due consideration.
- If in doubt, the medical practitioner should quantify the degree or severity of any relevant impairment by means
of objective tests, whenever appropriate tests are available, or by referring the candidate for further assessment.
- The term “assistance” means the use of another person to accomplish the task.
- The term “emergency duties” is used to cover all standard emergency response situations such as abandon
ship or firefighting as well as the procedures to be followed by each seafarer to secure personal survival. Annex B UK Dredging risk assessment UKD/002
Annex C Cherry Sand’s Safe System of Work No.5
Annex D UK Dredging New Joiner Induction
FD06065 | 2020_英国_safety-warning-about-carbon-monoxide-poisoning-after-the-loss-of-2-lives-on-the-motor-crui.pdf
分类:06_境外及港澳台调查报告 | 年份:2020 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
M A R I N E A C C I D E N T I N V E S T I G AT I O N B R A N C H SAFETY BULLETIN SAFETY BULLETIN SB2/2020 OCTOBER 2020 Carbon monoxide poisoning on board the motor cruiser Diversion on the River Ouse, in York, resulting in two fatalities, on 4 December 2019 Extracts from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 Regulation 5: “The sole objective of a safety investigation into an accident under these Regulations shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of such an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” Regulation 16(1): “The Chief Inspector may at any time make recommendations as to how future accidents may be prevented.” Press Enquiries: 01932 440015 Out of hours: 020 7944 4292 Public Enquiries: 0300 330 3000 NOTE This bulletin is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2020 See http://www. nationalarchives.gov.uk/doc/ open-government-licence for details. All bulletins can be found on our website: https://www.gov.uk/maib For all enquiries: Email: maib@dft.gov.uk Tel: 023 8039 5500 Fax: 023 8023 2459
MAIB SAFETY BULLETIN 2/2020 This document, containing safety lessons, has been produced for marine safety purposes only, on the basis of information available to date. The Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 provides for the Chief Inspector of Marine Accidents to make recommendations or to issue safety lessons at any time during the course of an investigation if, in his opinion, it is necessary or desirable to do so. The Marine Accident Investigation Branch is carrying out an investigation into into the fatal carbon monoxide poisoning on board the motor cruiser Diversion. The MAIB will publish a full report on completion of the investigation. Andrew Moll Chief Inspector of Marine Accidents NOTE This bulletin is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall not be admissible in any judicial proceedings whose purpose, or one of whose purposes, is to apportion liability or blame. This bulletin is also available on our website: www.gov.uk/maib Press Enquiries: 01932 440015 Out of hours: 020 7944 4292 Public Enquiries: 0300 330 3000
1 BACKGROUND On 4 December 2019, the owner of the 9.14m motor cruiser Diversion, and a friend, were killed by carbon monoxide poisoning after they returned from an evening out and prepared to sleep on board whilst the boat was moored on the River Ouse in York. The motor cruiser had been built by the owner over a period of 11 years and was completed in 2001. Since then, the owner had carried out several modifications to the boat, including the installation of a second-hand diesel-fuelled cabin heater in 2018. It was a cold evening and the cabin heater had been left running while the two casualties were eating and drinking with friends in the city centre. INITIAL FINDINGS The cabin heater (Figure 1) had been installed in a cabinet beneath the boat’s control panel and steering position. It drew combustion air from inside the boat and diesel fuel from one of the boat’s fuel tanks. The fuel/air mixture was burnt in the heater and the exhaust gas was discharged to outside, via a silencer, through an adjacent hull fitting. Circulating air was drawn from inside the cabinet, warmed by the heater and discharged into the cabin, via a nozzle mounted at deck level next to the steering position (Figure 2). The initial investigation found that the exhaust silencer was not approved for marine use, it was not gas tight and its connection to the exhaust pipework was loose. Consequently, a small but steady flow of carbon monoxide was leaking into the cabinet, which was then drawn into the heater’s air inlet and blown into the cabin space. As the carbon monoxide enriched air was drawn into the heater’s combustion chamber, and recirculated through the cabin, the cycle repeated itself and the levels of carbon monoxide gradually increased to lethal levels. The initial installation of the diesel heater was not checked by a professional engineer and it had never been serviced. The heater was one of four potential sources of carbon monoxide on board the motor cruiser, which was not fitted with a carbon monoxide alarm. The other potential sources were the boat’s engine, a portable petrol generator and a methylated spirit fuelled cooker. The MAIB has investigated fatal accidents1 where all three were identified as the source of the deadly toxic gas. It is a mandatory requirement under the Canal and Rivers Trust’s and the Environmental Agency’s Boat Safety Scheme (BSS) to fit carbon monoxide alarms on board all boats sailing on most inland waterways. Diversion was last surveyed, and its BSS Certificate re-issued in February 2019; the requirement to fit an alarm became mandatory 6 weeks later on 1 April 2019. 1 MAIB investigations: Eschol (report no 24/2014); Arniston (report no 2/2015); Love for Lydia (report no 9/2017) and Vasquez (report no 18/2017).
2 Figure 1: Heater installation with exhaust insulation removed Non-marine silencer leaking CO into air inlet Flexible exhaust pipe Combustion air inlet
3 Figure 2: Heater position Air outlet Heater under console
4 SAFETY LESSONS
● Diesel-fuelled cabin heaters are frequently installed in boats, trucks, caravans and motor homes. They are readily available to purchase both new and second-hand and may not necessarily be installed by a professional installation engineer. However, it is essential that they are installed in accordance with the manufacturer’s instructions and all components, used in a marine environment, should be approved for marine use. They should also be inspected by a suitably qualified engineer after installation and be regularly serviced and tested for leaks.
● Carbon monoxide is a by-product of combustion appliances fuelled by oils, solid fuel or gas. It has no smell, no taste, is colourless and is extremely difficult for human senses to detect. Therefore, it is essential that carbon monoxide alarms are fitted in areas where carbon monoxide could accumulate and pose a risk to health (such as the accommodation areas of boats). When selecting a carbon monoxide alarm, preference should be given to those marked as meeting safety standard EN 50291- 2:2010, which are intended for use in a marine environment. It is essential to fit alarms following the manufacturer’s guidance, to test them routinely using the test button and not to ignore them.
● Carbon monoxide is a silent killer. Its symptoms can be similar to colds, flu, hangovers or even Covid-19; headaches, dizziness, nausea, vomiting, tiredness, confusion, stomach pain and shortness of breath. If carbon monoxide poisoning is suspected, stop the source, get to the open air and seek medical attention.
FD06066 | 2020_英国_safety-warning-after-inadvertent-activation-of-condensed-aerosol-fire-extinguishing-system.pdf
分类:06_境外及港澳台调查报告 | 年份:2020 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
M A R I N E A C C I D E N T I N V E S T I G AT I O N B R A N C H SAFETY BULLETIN SB1/2020 MARCH 2020 Inadvertent discharge of a FirePro condensed aerosol fire extinguishing system during its installation on board the fishing vessel Resurgam (PZ 1001) on 15 November 2019 resulting in one fatality Extracts from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 Regulation 5: “The sole objective of a safety investigation into an accident under these Regulations shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of such an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” Regulation 16(1): “The Chief Inspector may at any time make recommendations as to how future accidents may be prevented.” Press Enquiries: 01932 440015 Out of hours: 020 7944 4292 Public Enquiries: 0300 330 3000 NOTE This bulletin is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2020 See http://www. nationalarchives.gov.uk/doc/ open-government-licence for details. All bulletins can be found on our website: https://www.gov.uk/maib For all enquiries: Email: maib@dft.gov.uk Tel: 023 8039 5500 Fax: 023 8023 2459 SAFETY BULLETIN Image courtesy of www.marinetraffic.com Resurgam
MAIB SAFETY BULLETIN 1/2020 This document, containing safety lessons, has been produced for marine safety purposes only, on the basis of information available to date. The Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 provides for the Chief Inspector of Marine Accidents to make recommendations or to issue safety lessons at any time during the course of an investigation if, in his opinion, it is necessary or desirable to do so. The Marine Accident Investigation Branch is carrying out an investigation into the fatality of a shore- based engineering apprentice who was working in the engine room of the fishing vessel Resurgam in Newlyn on 15 November 2019. The MAIB will publish a full report on completion of the investigation. Andrew Moll Chief Inspector of Marine Accidents NOTE This bulletin is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall not be admissible in any judicial proceedings whose purpose, or one of whose purposes, is to apportion liability or blame. This bulletin is also available on our website: www.gov.uk/maib Press Enquiries: 01932 440015 Out of hours: 020 7944 4292 Public Enquiries: 0300 330 3000
1 BACKGROUND On 15 November 2019, the UK registered fishing vessel Resurgam was in Newlyn, England undergoing maintenance. An engineer and an apprentice from the owner’s shore-based support team were working on the main engine in the engine room. Also working in the engine room were two contractors installing a new FirePro condensed aerosol fire extinguishing system. During the installation and without warning, the fire extinguishing system partially and inadvertently discharged, filling the engine room with a dense cloud of aerosol fire suppressing particles (Figure 1). Both installation contractors and the company’s engineer managed to evacuate, but the apprentice collapsed in the engine room. He was later recovered by the local fire and rescue service but was found not breathing and could not be resuscitated. Figure 1: Typical discharge of a condensed aerosol fire suppressant (not at time of accident) Aerosol generator INITIAL FINDING The exact causes and circumstances of this accident are still being investigated and the findings will be published by the MAIB in a full investigation report. However, during the inadvertent discharge, it is evident that the apprentice inhaled a high concentration of the suppressant particles and this significantly contributed to the fatality.
2 FirePro’s Installation and User Manual and its product’s material safety data sheets had recognised the inadvertent discharge of the system, particularly during installation and maintenance, as a hazard. However, the loss of life was not identified as a potential outcome; therefore, the risk associated with inhaling or ingesting a large volume of the suppressant particles was not fully appreciated or protected against. SAFETY LESSONS Vessel owners, operators and those contracted to install FirePro and other similar condensed aerosol fire extinguishing systems should be fully aware of the potential risk to life from exposure to the aerosol particles. Safety precautions should be put in place to ensure that personnel are not exposed to this hazard:
● Prior to intentional discharge of a condensed aerosol system, there should be visible and audible alarms to alert personnel. Checks should also be made to ensure the protected compartment has been evacuated before the system is activated.
● When condensed aerosol fire extinguishing systems are being installed or maintained the system should be fully isolated to guard against inadvertent activation, non-essential personnel should be clear of the area and an enclosed space rescue plan should be in place. RECOMMENDATION FirePro is recommended to: S2020/114 Issue a safety alert to the owner/operators of vessels fitted with its systems and its network of marine installation/maintenance engineers highlighting the circumstances of this accident and advising them of appropriate measures to take to reduce the risk of exposure to fire suppressant particles. Safety recommendations shall in no case create a presumption of blame or liability
FD06067 | 2020_英国_subsea-explosion-resulting-in-damage-to-crab-potting-vessel-galwad-y-mor-and-injuries-to-c.pdf
分类:06_境外及港澳台调查报告 | 年份:2020 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
ACCIDENT REPORT ACCIDENT REPORT Report on the investigation of a subsea explosion resulting in crew injuries and vessel damage to the crab potting vessel Galwad-Y-Mor (BRD 116) 22 nautical miles north of Cromer, England on 15 December 2020 SERIOUS MARINE CASUALTY REPORT NO 1/2022 JANUARY 2022
The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. Front Cover image courtesy of Andrew Oliver © Crown copyright, 2022 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. All MAIB publications can be found on our website: www.gov.uk/maib For all enquiries: Marine Accident Investigation Branch First Floor, Spring Place 105 Commercial Road Southampton SO15 1GH United Kingdom Email: maib@dft.gov.uk Telephone: +44 (0)23 8039 5500 Press enquiries during office hours: +44 (0)1932 440015 Press enquiries out of hours: +44 (0)300 7777878
CONTENTS SYNOPSIS 1 SECTION 1 – FACTUAL INFORMATION 2 1.1 Particulars of Galwad-Y-Mor and accident 2 1.2 Narrative 3 1.3 Environmental conditions 5 1.4 Galwad-Y-Mor 6 1.4.1 Vessel description 6 1.4.2 Crew 6 1.4.3 Vessel operation 9 1.4.4 Vessel stability 9 1.5 Crew injuries and vessel damage 9 1.5.1 Crew injuries 9 1.5.2 Vessel damage 9 1.6 Examination of rope and metal fragment 13 1.6.1 Explosive trace examination 13 1.6.2 Metallurgical examination of metal fragment 13 1.7 Ordnance 18 1.7.1 Unexploded ordnance found at sea 18 1.7.2 Injuries to people on vessels subjected to subsurface exploding ordnance 18 1.7.3 Effect to vessels subjected to subsurface exploding ordnance 19 1.7.4 Records of at sea unexploded ordnance 19 1.7.5 Potential unexploded ordnance near the Galwad-Y-Mor accident location 20 1.7.6 Unexploded ordnance guidance available to mariners 20 1.8 Previous/similar accidents 23 SECTION 2 – ANALYSIS 24 2.1 Aim 24 2.2 The accident 24 2.2.1 The ordnance 24 2.2.2 The explosion 24 2.2.3 Crew injuries 24 2.2.4 Vessel damage 25 2.2.5 Anticipation of the danger from unexploded ordnance 25 2.2.6 UXO location information available to fishermen 26 2.3 Post-accident 26 2.3.1 Emergency response 26 2.3.2 Vessel survivability 26 SECTION 3 – CONCLUSIONS 27 3.1 Other safety issues directly contributing to the accident 27 SECTION 4 – ACTION TAKEN 28 4.1 MAIB actions 28 SECTION 5 – RECOMMENDATIONS 28
FIGURES Figure 1: Location of the accident Figure 2: Galwad-Y-Mor settled low in the water Figure 3: Galwad-Y-Mor general arrangement plan Figure 4: Galwad-Y-Mor hull and keel detail Figure 5: Galwad-Y-Mor crab potting arrangement Figure 6: Position of crew and injuries sustained at time of the accident Figure 7: Galwad-Y-Mor structural damage Figure 8: Galwad-Y-Mor machinery damage Figure 9: Galwad-Y-Mor interior damage Figure 10: Steel fragment detail Figure 11: SC250 high explosive bomb Figure 12: Possible UXO in Dudgeon Wind Farm survey area Figure 13: SC250 high explosive bomb found and detonated in Dudgeon Wind Farm survey area TABLES Table 1: Results of explosive trace examination Table 2: Elemental composition of the metal fragment
GLOSSARY OF ABBREVIATIONS AND ACRONYMS ALB
all-weather lifeboat DNT
dinitrotoluene EH
exploratory hunting EOD
explosive ordnance disposal FRB
fast rescue boat FTB
fast transfer boat GP
general purpose HE
high explosive kg
kilogram kW
kilowatt m
metre mm
millimetre MGN
Marine Guidance Note MOD
Ministry of Defence MSN
Merchant Shipping Notice MVC
microvoid coalescence ng
nanogram nm²
square nautical mile
OREI
Offshore Renewable Energy Installations
PFD
personal flotation device RDX
Research Department eXplosive RN
Royal Navy RNLI
Royal National Lifeboat Institution RoW
Receiver of Wreck t
tonne
TNT
trinitrotoluene UKAS
United Kingdom Accreditation Service
UKHO
UK Hydrographic Office UTC
universal time coordinated UXO
unexploded ordnance VHF
very high frequency WWI
The First World War WWII
The Second World War TIMES: all times used in this report are UTC unless otherwise stated. Galwad-Y-Mor Image courtesy of Andrew Oliver
1 SYNOPSIS On 15 December 2020, the 14.95m crab potting vessel, Galwad-Y-Mor, disturbed a piece of unexploded ordnance on the seabed while recovering crab pots in the North Sea, approximately 22 nautical miles off Cromer, England. The ordnance detonated and the ensuing explosion threw Galwad-Y-Mor up from the surface of the sea, causing significant crew injuries and damage to the vessel. The crew were rescued and evacuated to local hospitals and Galwad-Y-Mor was later towed to Grimsby. The MAIB investigation found that: ●The ordnance was an air-dropped bomb that had remained intact on the seabed since The Second World War. ●The bomb detonated on the seabed and the shock wave and gas bubble from the explosion hit Galwad-Y-Mor. ●The position of most seabed unexploded ordnance is unknown and Galwad-Y-Mor’s crew could not have anticipated the fouling of a bomb in the crab potting string. ●Galwad-Y-Mor’s crew training, experience, length of service together and emergency preparedness improved their survival chances. ●Galwad-Y-Mor’s hull was well constructed and able to withstand the force of the nearby seabed explosion. Based on this accident’s circumstances, no action has been taken by external stakeholders and no recommendations made. The aim of this report is to highlight the dangers that still exist with unexploded ordnance in the seas around the UK, and the actions to take should fisherman encounter any. In this case, the skipper and crew could not have foreseen the explosion and their level of preparedness to deal with such an emergency saved lives.
2 SECTION 1 – FACTUAL INFORMATION 1.1 PARTICULARS OF GALWAD-Y-MOR AND ACCIDENT SHIP PARTICULARS Vessel’s name Galwad-Y-Mor Flag United Kingdom IMO number/fishing numbers BRD 116 Type Crab potting vessel Registered owner The Galwad-Y-Mor Shellfish Company Manager(s) Not applicable Construction 2007 Year of build Steel Length overall 14.95m Registered length 12.90m Gross tonnage 63.23 VOYAGE PARTICULARS Port of departure Grimsby Port of arrival Grimsby Type of voyage Commercial Cargo information Shellfish Manning 7 MARINE CASUALTY INFORMATION Date and time 15 December 2020 at 1122 Type of marine casualty or accident Serious Marine Casualty Location of accident 53°18.59’N 001°15.46’E Place on board Hull and all compartments Injuries/fatalities Significant injuries to crew members Damage/environmental impact Extensive deformation to hull plating, engine room flooded and severe shock damage in all internal compartments Ship operation Fishing, recovering pots External & internal environment Wind, south-westerly force 3-4, sea state slight/moderate, visibility good Persons on board 7
3 1.2 NARRATIVE At about 2000 on 13 December 2020, the crab potting vessel, Galwad-Y-Mor left Grimsby with seven crew on board and spent the following day shooting and recovering strings of crab pots in the North Sea. Galwad-Y-Mor made passage overnight to the next crabbing ground; the skipper and five of the crew took rest while the night watchman navigated the vessel. On the morning of 15 December, Galwad-Y-Mor was operating in fishing grounds east of The Wash (Figure 1). The vessel was loaded with approximately 3 tonnes (t) of catch in the seawater-filled vivier tank1, 7t of bait, and approximately 7000 litres of fuel. At about 1110, the crew started to haul in a string of 100 crab pots from 30m water depth; the string’s main line was about 1.2 miles long. The skipper was seated in the wheelhouse pilot chair, five crew were on the main deck, and the night watchman was in bed in the crew cabin. After approximately 15 crab pots had been hauled on board, the crew signalled to the skipper that there was a lot of tension to the main line. The skipper increased the vessel’s engine speed in an attempt to free the potting string from the seabed. At 1122, there was an explosion external to Galwad-Y-Mor and three loud bangs were heard by the crew on the main deck. The vessel was thrown about. Propulsion and electrical power immediately failed. The main deck was deluged with seawater and one crew member’s personal flotation device (PFD) automatically inflated. The skipper had hit his head and was dazed; four of the crew were severely injured but all remained conscious. The wheelhouse equipment was seriously damaged, water flooded onto the main deck, and into the engine room, and the vessel settled low in the water (Figure 2). The skipper roused the night watchman and made a distress call with a handheld very high frequency (VHF) radio on channel 16. Unsure that the distress call had been received, he contacted fishing vessel Ingenuity’s skipper via mobile phone messaging service and requested that a distress message be relayed to the coastguard. Galwad-Y-Mor’s skipper launched the liferaft with the help of a crew member and ordered the crew to prepare to abandon ship. At 1148, the coastguard tasked a search and rescue helicopter to fly to the accident site. At 1158, a Royal National Lifeboat Institution (RNLI) all-weather lifeboat (ALB), based at Cromer, was also tasked to Galwad-Y-Mor by the coastguard. The captain of wind farm offshore support vessel Esvagt Njord, positioned approximately four miles to the south of the accident site, heard the VHF distress call and dispatched his vessel’s fast rescue boat (FRB) to help Galwad-Y-Mor’s crew. Galwad-Y-Mor’s skipper assisted three crew members to board the FRB once it had arrived, and then cut away the potting string from Galwad-Y-Mor’s hauler. After hearing reports of the severity of crew injuries, Esvagt Njord’s captain then dispatched his vessel’s fast transfer boat (FTB) to the accident site. Once it had arrived alongside, Galwad-Y-Mor’s skipper and the remaining crew members boarded the FTB and both boats returned to Esvagt Njord. By 1159, they were hoisted on board. Esvagt Njord’s crew and the team of wind farm contractors on board, which included a paramedic, administered first aid to the injured fishermen. 1 A vivier tank is used for storing live shellfish.
4 Figure 1: Location of the accident Reproduced from Admiralty Chart 0002 by permission of HMSO and the UK Hydrographic Office Accident location Fishing grounds Reproduced from Admiralty Chart 2182A by permission of HMSO and the UK Hydrographic Office
5 Figure 2: Galwad-Y-Mor settled low in the water Image courtesy of Andrew Oliver At 1350, two of Galwad-Y-Mor’s crew were airlifted from Esvagt Njord by the coastguard helicopter and taken to hospital. At 1430, four crew were taken ashore to Cromer in the ALB and then to hospital by ambulance. At 1550, the last injured crew member was taken to hospital by the coastguard helicopter. Galwad-Y-Mor’s owner arranged for the tug GPS Avenger to salvage Galwad-Y-Mor. At about 2130, Galwad-Y-Mor was taken under tow to Grimsby, and was lifted out of the water into a local ship repair facility the following morning. On 27 December 2020, Galwad-Y-Mor’s owner boarded Ingenuity and, on arrival at the accident location, recovered the remainder of the potting string. A distorted metal fragment was found in one of the crab pots; the MAIB sent the fragment and a section of rope from the crab pot string to explosive analysis specialists and metallurgists for forensic examination. 1.3 ENVIRONMENTAL CONDITIONS At the time of the accident, the wind was southerly force 3 to 4, visibility was good and the sea state was slight to moderate.
6 1.4 GALWAD-Y-MOR 1.4.1 Vessel description Galwad-Y-Mor (Figure 3) was designed by Macduff Ship Design Ltd and built in 2007 by MMS shipyard in Hull. The vessel had a 6mm steel-plated hull, set on frames 450mm apart, and a box keel (Figure 4). Galwad-Y-Mor had a shelter deck with a wheelhouse and deck crane. The main deck had aft accommodation, including a galley, crew mess and shower. At its forward end was a working area with a hydraulic hauling winch and catch handling table and a store that was also used as a working mess room. There was a ‘tween deck clearance of approximately 2.3m between the main deck and shelter deck. The lower deck consisted of a six berth cabin, separate skipper’s cabin, four fuel tanks and a steering compartment to aft. The engine room was positioned at midships and there was a vivier tank, bait hold and freshwater tank to forward. The engine room had a 265kW main engine that provided power for propulsion. There was also a 100kW main generator, harbour generator and main electrical switchboard fitted in the engine room. The wheelhouse was equipped with three VHF radios, one with Digital Selective Calling2 functionality for sending distress messages and two handheld radios. The navigation equipment consisted of two radars, a chart plotter, an echo sounder and two fishing computers. The wheelhouse floor to deckhead clearance was approximately 2.5m. Interior linings and wheelhouse equipment were fixed to wood battens bonded to the steel structure. 1.4.2 Crew Galwad-Y-Mor was crewed by a skipper, night watchman and five deckhands. The crew had worked together for several years and held the mandatory qualifications to work on a fishing vessel of this size. The crew had undergone safety familiarisation and periodic training on board Galwad-Y-Mor. Safety routines, such as man overboard, abandon ship and fire drills were carried out each month in accordance with the requirements of Merchant Shipping Notice (MSN) 1871 Amendment 1 (F) Code of Practice for the Safety of Small Fishing Vessels of less than 15m Length Overall. At the time of the accident, all crew on the main deck were wearing automatic inflation PFDs and the two crew working around the hauling table were wearing hard hats. The main deck watertight doors to the accommodation and engine room and fish hold hatch cover were all closed. This was standard practice when Galwad-Y-Mor was at sea. 2 Digital Selective Calling (DSC) is a method of quickly sending designated pre-programmed digital messages that automatically include a vessel’s identification and location.
7 Figure 3: Galwad-Y-Mor general arrangement plan Image courtesy of Macduff Ship Design
8 Figure 4: Galwad-Y-Mor hull and keel detail Hull steel plating 6mm thick Frame spacing 450mm Image courtesy of Macduff Ship Design
9 1.4.3 Vessel operation Galwad-Y-Mor was owned and operated by the Galwad-Y-Mor Shellfish Company that also owned Ingenuity, a second potting vessel. Galwad-Y-Mor typically caught crab and lobster in the North Sea. Both vessels had regularly caught crab in the accident’s vicinity and it was common for their pots and lines to catch on objects such as boulders on the seabed. The skipper navigated Galwad-Y-Mor during daytime passages and potting operations. The night watchman usually navigated the vessel to the next crabbing ground overnight. At the start of potting operations, the skipper manoeuvred the vessel towards a pot string marker buoy while steering by hand. The crew retrieved the marker buoy and used the hydraulic hauling winch, which had a 2t lifting capacity, to heave the string of pots onto the catch handling table. The skipper switched the steering to autopilot and used the throttle to manually control the vessel’s speed. Two deckhands worked either side of the catch handling table, emptying each pot in turn and dropping the crabs into the vivier tank. The other three deckhands rebaited the pots and stacked them on the main deck in preparation for the next shoot (Figure 5). Each string consisted of 60 to 100 crab pots. Each pot weighed approximately 30kg when full; the recovery, rebaiting and shooting of a string of pots took about an hour. Galwad-Y-Mor’s skipper recorded the track of each crab pot string in the fishing computer. It was typical to spend 7 days at sea, catch around 14t of crab and use about 1t of bait per day. 1.4.4 Vessel stability Galwad-Y-Mor‘s owner was supplied with a stability booklet on the vessel’s delivery and Galwad-Y-Mor had not been significantly altered since its build. To minimise free surface effect3 the vessel’s load conditions were based on a full vivier tank, which both the owner and skipper were aware of. The vessel’s intact stability passed the various MSN 1871 Amendment 1 (F) load condition requirements. Section 3.37 of the MSN required damage stability to be calculated for multihulled fishing vessels, which was not applicable to Galwad-Y-Mor. 1.5 CREW INJURIES AND VESSEL DAMAGE 1.5.1 Crew injuries Five of the seven crew experienced significant injuries in the accident, some of which were life-changing (Figure 6). Most of the injured crew required operations and extended stays in hospital, during which one crew member contracted COVID-19. 1.5.2 Vessel damage There was significant structural damage to Galwad-Y-Mor. Hull plating was pushed in by up to 40mm between frames and the starboard side hull plating was holed. The transverse bulkheads were buckled, and the port side bilge keel was twisted (Figure 7). 3 Free surface effect occurs when a ship’s tank or compartment is partially filled and any rolling motion causes the liquid to move and reduce ship stability.
10 Figure 5: Galwad-Y-Mor crab potting arrangement Shooting hatch Pots baited and stacked Normal lead of potting string Crabs into Vivier tank Hauling table Image courtesy of Macduff Ship Design
11 Figure 6: Position of crew and injuries sustained at time of the accident Skipper: 1.85m tall, 100kg. Seated in wheelhouse. 3 broken vertebrae, sternum and orbital bone. Knee injuries. Deckhand 1: 1.87m tall, 100kg. Fractured skull, pelvis, arm, ribs and toes. Ruptured bladder Deckhand 2: 1.87m tall, 89kg. Broken leg, damaged knees and elbow. Punctured lung Deckhand 3: 1.8m tall, 76kg. Head injuries: plate to cranium, loss of sight in one eye Deckhand 4: 1.76m tall, 97kg. Minor injuries to shoulder, ankles, heels, neck and back Deckhand 5: 1.83m tall, 120kg. Cuts and bruises Night watchman: 1.8m tall, 76kg. Prone in upper bunk. Broken leg, hip and shoulder Image courtesy of Macduff Ship Design
12 Figure 7: Galwad-Y-Mor structural damage Pushed in hull plating Port side bilge keel twisted Hull plating holed Buckled transverse bulkhead
13 The main engine, gearbox, generator, switchboard, hydraulic power pack and miscellaneous small pumps sheared from their rigid mountings. The main seawater inlet valve was sheared at its inlet flange and the engine room was flooded to the top of the compartment. The rudder actuator was displaced from the rudder stock (Figure 8). The wheelhouse equipment and linings were displaced from their mountings. The outfitting of the galley, crew mess, toilet and cabin was significantly damaged (Figure 9). There was a great deal of disruption to external deck areas with numerous instances of scattered equipment, damage to mast-mounted antennae, displaced light fittings, and broken pipe clamps. 1.6 EXAMINATION OF ROPE AND METAL FRAGMENT 1.6.1 Explosive trace examination The recovered metal fragment and crab pot rope were tested for traces of a range of explosives in line with United Kingdom Accreditation Service (UKAS)4 standard operating procedures and methods. Table 1 shows the test results: Explosive Quantity of explosive recovered from sample/ ng5 Metal Fragment Rope Dinitrotoluene (DNT) Indicated 0 Picrate Indicated 0 Research Department Explosive (RDX) 0.2 0 R-salt6
0 Trinitrotoluene (TNT) 1600 9 Table 1: Results of explosive trace examination Trinitrotoluene (TNT) was identified on both the metal fragment and the rope. TNT is used widely across the world in many explosive applications and was commonly used in First World War (WWI) and Second World War (WWII) ordnance. The quantity of TNT detected on the metal fragment was consistent with the item having been in direct contact with the explosive or an item heavily contaminated with it. The quantity of TNT detected on the rope was also consistent with it being in contact with the explosive. The small amounts of some of the other explosives found on the metal fragment were too low to provide the basis for conclusive analysis. 1.6.2 Metallurgical examination of metal fragment The metal fragment (Figure 10) was magnetic and measured 94mm in length, 129mm in width and had a 7.41mm average thickness. Visual inspection showed that the metal fragment had deformed into a curved shape. Rust was visible on 4 UKAS is the national accreditation body appointed by UK government to assess organisations that provide certification, testing and calibration services. 5 Nanogram one thousand millionth of a gram. 6 R-salt is a derivative of Research Department eXplosive.
14 Figure 8: Galwad-Y-Mor machinery damage Switchboard sheared from mountings Sheared main seawater inlet valve Displaced rudder actuator Engine sheared from rigid mountings
15 Figure 9: Galwad-Y-Mor interior damage Wheelhouse Crew toilet Crew mess
16 Figure 10: Steel fragment detail Image courtesy of the 1710 Naval Air Squadron Face A Fracture surface 1 Fracture surface 4 Fracture surface 2 Face B Fracture surface 3 Figure 11: SC250 high explosive bomb 'Bottling' section of 250kg HE bomb Images courtesy of the Defence Science and Technology Laboratory
17 both sides and observed as more progressed along the concave face (Face B), indicative of longer exposure to a corrosive environment or an accelerated reaction to corrosion. The metal fragment’s four fracture surfaces (Figure 10) were examined with scanning electron microscopy and showed features consistent with ductile microvoid coalescence (MVC)7. These features are indicative of ductile overload, which is the failure mode that occurs when a material is loaded to beyond its ultimate tensile strength. Optical profilometry showed machine tool marks on the metal fragment’s convex face (Face A) (Figure 10) consistent with a turning tool8 machining process. The metal fragment was examined by scanning electron semi-quantitative Energy Dispersive X-ray Analysis9, which established the metal’s elemental composition (Table 2). Elements found Weight as a % of the fragment Silicon 0.5-0.6 Vanadium 0.4-0.5 Phosphorus Not applicable Chromium 1.4-1.9 Manganese 0.6-0.8 Carbon 0.42 Sulphur 0.02 Nickel Not applicable Iron 96.597.8 Other elements
Table 2: Elemental composition of the metal fragment The metal fragment’s composition was consistent with a medium carbon steel that is obsolete and historic in nature. The metal fragment’s properties were compared with that of historic ordnance and it was found that:
The material thickness was greater than that commonly used in torpedoes and depth charges.
The material thickness was greater than that used in WWI and WWII British and German sea mines. Also, the elemental composition of the fragment was remarkably different from a WWII German mine casing, which tests found was made from iron with 0.5% manganese and no other alloying elements.
The material thickness and machining method was comparable with that used on the ‘bottling section’ of a general purpose (GP) high explosive (HE) air-dropped bomb (Figure 11). The fragment’s elemental composition was 7 MVC is a process where voids form and join in a material resulting in a failure. 8 Machining process used to manufacture round components. 9 This is a widely applied elemental microanalysis method capable of identifying and quantifying all elements in the periodic table except Hydrogen, Helium, and Lithium.
18 comparable with materials used in German SC10 250 GP air-dropped HE bombs, manufactured between 1940 and 1942. SC bombs were the most deployed air-dropped WWII German bomb and weighed 1800kg, 1000kg, 250kg or 50kg respectively. The SC250 bomb was 1173mm long, 385mm in diameter, and contained approximately 123kg of explosive that consisted of TNT and ammonium nitrate. Historic bombing records indicated that approximately 10% of HE bombs dropped during WWII did not detonate11. 1.7 ORDNANCE 1.7.1 Unexploded ordnance found at sea In a paper titled Low order deflagration for UXO disposal for the commercial sphere, submitted to a UK parliamentary sub-committee in September 2020, it was estimated that there are approximately 500,000 (100,000t) pieces of unexploded ordnance (UXO) in the seas around the UK. This UXO may originate from German or allied air-dropped bombs jettisoned to sea after aborted bombing missions, German air-dropped bombs used to target allied shipping, depth charges, torpedoes, sea mines. Since WWII, the Royal Navy (RN) also disposed of expired ordnance at sea in approved designated areas. UXO contains an explosive charge that can produce unstable degradation products over time. If an immersed UXO casing remains intact, the explosive and any degradation products are not washed away by seawater. When UXO is disturbed, the degradation products can detonate and cause a secondary detonation of the main explosive charge. An unstable fuse can also cause intact UXO to detonate if disturbed. At sea, WWI and WWII UXO is highly volatile and explosive ordnance disposal (EOD) specialists tend to dispose of it by controlled explosion rather than attempt to defuse. 1.7.2 Injuries to people on vessels subjected to subsurface exploding ordnance Injuries sustained due to a subsurface ordnance explosion are categorised as follows: ● Primary injuries are blast type injuries caused by proximity to an explosion and include shock wave damage to internal organs such as lungs and intestines. ● Secondary injuries are penetrative injuries caused by interaction of the body with fragments from the explosion, such as shrapnel. ● Tertiary injuries are blunt force trauma injuries caused by the body being rapidly thrown about by the blast. ● Quaternary blast injuries are thermal burn injuries due to exposure to the explosive blast. 10 Sprengbombe cylindrish German to English translation: high explosive cylindrical bomb. 11 The Imperial War Museum: https://www.bbc.com/future/article/20150922-these-nazi-bombs-are-more- dangerous-now-than-ever-before.
19 1.7.3 Effect to vessels subjected to subsurface exploding ordnance The damage experienced by a vessel from an underwater explosion is dependent on its proximity to the ordnance at the time of the explosion. In the case of a vessel striking a piece of ordnance such as a contact mine, the ensuing explosion causes direct damage to the hull in the form of a hole, and secondary damage to equipment from fragmentation of the mine casing and the vessel’s structure. Damage caused by contact with ordnance usually includes flooding and the sinking of the vessel. A more distant underwater explosion of a piece of ordnance creates a gas bubble that rises to the surface, collapses, and is filled with seawater moving at high velocity, which creates a water plume jettisoned into the air. If the collapsing gas bubble interacts with a vessel’s hull, the energy from the in-rush of seawater can hole the hull or even break it apart. Ordnance detonated on the seabed creates a shock wave that tends to exert hydraulic pressure to any nearby vessels on the surface, causing them to be thrown about. Damage may include pushing in of hull plating and displacement of equipment. In large explosions, nearby vessels can be thrown upwards out of the water, causing the unsupported hull to hog and then abruptly sag, which can result in a broken keel. It is common for people to hear more than one bang when a vessel encounters a single underwater explosion. This is due to reverberation of sound caused by the pulse bubble and shock wave. Blast effect modelling of a seabed ordnance explosion at a 30m water depth showed that the onset of surface vessel damage would require a minimum explosive charge of 121.5kg TNT equivalent12 and would result in a surface gas bubble of 2.5 to 3.0m in diameter. The Ministry of Defence (MOD) recommend that, to safely avoid damage when clearing UXO, non-military vessels should keep a distance of at least 530m during a controlled underwater explosion of ordnance this size. 1.7.4 Records of at sea unexploded ordnance The Receiver of Wreck (RoW) is a government body that deals with cases of voluntary salvage wreck material across the UK. The RoW keeps records of reported UXO findings and activities such as EOD clearance in UK waters. In the five years prior to this accident, the RoW listed 49 instances of ordnance found at sea, of which 31 related to UXO found in fishing nets. The rest occurred during dredging, diving, subsea surveying and mine hunting. The UK Hydrographic Office (UKHO) is the MOD agency responsible for providing hydrographic and marine geospatial data to mariners and maritime organisations across the world. The UKHO held some records of British and German WWII minefields, collated from RN reference books, historic admiralty charts and copies of original German records stored in the RN Historic Branch archive. The UKHO considered the currency of this information to be questionable due to inaccuracy of positional data at the time of mine laying, the effect of the passage of time on submerged mines and the lack of detail of the effectiveness of mine clearance activities. Known seabed ordnance dumps are marked on published admiralty 12 This is the method of quantifying the energy released in explosions.
20 charts. Because the location of other seabed UXO such as air-dropped bombs, depth charges and torpedoes are unknown, they are not marked on UKHO charts or other charting systems used by the fishing industry. Developers of Offshore Renewable Energy Installations (OREI) often consult with commercial organisations that hold digitalised records of WWII minefields when developing plans for new OREI. It is commonplace to carry out extensive seabed UXO surveys prior to installation of windfarms, subsea turbines and subsea power or telecom cables. If UXO is detected, then further surveys may be carried out to determine if they can be left in position, moved, or detonated. A UXO survey report is then submitted to the marine licensing authority responsible for the geographical OREI area, such as The Crown Estate. UXO survey information can be downloaded free of charge from The Crown Estate’s Marine Data Exchange website13. A pre-installation seabed survey of the Dudgeon Offshore Wind Farm site, which was 1.5nm to the east of the Galwad-Y-Mor accident, covered a 90 square nautical mile survey area (Figure 12). It identified numerous potential UXO targets, of which 244 were classed as high risk to the wind farm’s installation and operation. EOD specialists cleared several UXO, including German SC bombs, using controlled explosion methods and post detonation fragment collection (Figure 13). 1.7.5 Potential unexploded ordnance near the Galwad-Y-Mor accident location The Galwad-Y-Mor accident occurred beneath WWII flight paths used by both allied and German air forces, which jettisoned numerous bombs into the sea. The location was also close to coastal shipping routes and known British and German historic WWII minefields. Although the minefields were swept by the RN during WWII and in post-war years, whether this activity was completely effective is unknown. None of the RoW recorded UXO findings were within a 10nm radius of the Galwad-Y-Mor accident, and the nearest charted ordnance dump lay more than 100nm to the east. In February 2021, the RN carried out an exploratory hunting (EH) survey of a 1nm² area centred on a datum at the first reported position of the Galwad-Y-Mor accident, which was approximately 3.5nm north-west of the explosion. As a result of the EH survey, the RN concluded that this location was not historically used to dump munitions. 1.7.6 Unexploded ordnance guidance available to mariners The Maritime and Coastguard Agency’s Marine Guidance Note (MGN) 323 (M+F) Explosives Picked Up At Sea, provided guidance to owners, masters, skippers and crew of trawlers, fishing vessels, dredgers and other vessels involved in seabed operations. The MGN advised that explosives found at sea can be volatile and should not be landed on deck or tampered with; suspected ordnance should be reported to the coastguard. It also stated that fishing vessels suspecting they have an item of ordnance in their trawls should reduce vessel speed, transit to a safe area, and lower their trawl to the seabed in a depth of less than 30m if possible, while notifying the coastguard of their position. 13 www.marinedataexchange.co.uk.
21 Figure 12: Possible UXO in Dudgeon Wind Farm survey area Reproduced from Admiralty Chart 2182A by permission of HMSO and the UK Hydrographic Office Position of accident Dudgeon Wind Farm survey area UXO survey ST13504 Possible UXO targets Low risk Moderate risk High risk Dudgeon wind turbines Dudgeon cables Image courtesy of Equinor UK Ltd
22 Figure 13: SC250 high explosive bomb found and detonated in Dudgeon Wind Farm survey area 250kg HE bomb found on seabed 250kg HE bomb fragment post clearance detonation Image courtesy of Equinor UK Ltd
23 The Crown Estate’s Guidance Note Dealing with munitions in marine sediments, provided guidance for dealing with potential UXO recovered from the seabed by vessels dredging for aggregates, undertaking navigational dredging, and discharging cargos. This document detailed procedures for identifying potential UXO and the notification of retained EOD specialists, police or coastguard dependent on the vessel’s location. 1.8 PREVIOUS/SIMILAR ACCIDENTS In December 2020, a Marine Scotland research vessel operating in the Firth of Clyde landed a 350kg explosive charge German WWII mine on board. The crew alerted the coastguard and were evacuated from the vessel by the RNLI. An RN EOD team lowered the mine to the seabed and carried out a controlled explosion. In February 2017, a dredger recovered what was believed to be a German SC250 bomb in Portsmouth Harbour, England. The bomb was towed out to sea and blown up by an RN EOD team. In November 2016, fishing vessel Star of Annan (OB50) picked up what was thought to be a chemical bomb while dredging for scallops in the Irish Sea. The bomb exploded and caused a small fire on the deck of the fishing vessel and chemical injuries to crew members.
24 SECTION 2 – ANALYSIS 2.1 AIM The purpose of the analysis is to determine the contributory causes and circumstances of the accident as a basis for making recommendations to prevent similar accidents occurring in the future. 2.2 THE ACCIDENT 2.2.1 The ordnance Although the external explosion to Galwad-Y-Mor occurred in the vicinity of historic WWII offensive and defensive minefields, the material thickness and elemental composition of the recovered metal fragment shows that it was unlikely it originated from a German or British sea mine. The elemental composition, thickness, machine tool marks and the exposure to TNT of the recovered metal fragment suggest with a high degree of certainty that it originated from an unexploded WWII German HE SC250 air-dropped bomb. The metal fragment’s deformation and ductile overload indicates that it was exposed to an explosive event. The lack of overall corrosion to the recovered fragment suggests that the bomb was buried below the seabed for several years. The light corrosion to one surface of the metal fragment indicates that the bomb was intact and not flooded, therefore the explosive charge had not been washed away by seawater. The lack of a major hole to Galwad-Y-Mor’s hull indicates that the vessel did not directly contact the bomb. It is likely that direct exposure to the full detonation of ordnance, containing 123kg explosive charge, would have blown the vessel apart. Galwad-Y-Mor’s damage was commensurate with the explosive charge detonating below the vessel at a water depth of 30m, therefore it is likely that the bomb fully detonated on the seabed. 2.2.2 The explosion The string of pots the crew were attempting to recover at the time of the explosion most likely became fouled on an SC250 bomb. It is possible that the bomb was dragged along the seabed and caught on an obstacle, such as a boulder, causing the potting string to tighten on the hauler. As Galwad-Y-Mor’s skipper increased vessel power, the disturbance of the bomb caused either an unstable fuse to activate or explosive charge degradation products to detonate and this resulted in the bomb exploding on the seabed. 2.2.3 Crew injuries Most of the injuries experienced by the crew were of a blunt force trauma nature and did not include penetrating wounds, burns or major internal damage (Figure 6). These were consistent with tertiary injuries most likely caused by the acceleration forces the crew experienced when Galwad-Y-Mor was thrown about. The head injuries to deckhands 1 and 3, who were not wearing safety helmets, suggests they struck the deckhead at the time of the accident. The skipper was seated when the
25 bomb exploded and struck his head on the wheelhouse deckhead, which caused injuries to his eye socket and face. His back and knee injuries were probably incurred when he landed back down on the deck. Although the physical injuries were significant to five of the seven crew, they were fortunate not to be killed. The crew member working on the starboard side of the main deck could have been ejected overboard. Although wearing a working PFD, his survivability might have been threatened by the impeded ability of the injured crew to retrieve him. 2.2.4 Vessel damage The potting string quickly tightening at the hauler suggested that the bomb was directly below the vessel on the seabed prior to the explosion. The hull plating deformation, buckled bulkheads, and machinery and equipment displacement were commensurate with Galwad-Y-Mor interacting with the shock wave created by the explosion. It is likely that the single hole to the hull plating was caused by the plating bending in way of the adjacent structure and fracturing as a result. It is therefore concluded that Galwad-Y-Mor was close to the explosion and well below the MOD’s recommended 530m safe stand-off distance for non-military vessels to be unaffected by a seabed explosion of this size. Nevertheless, Galwad-Y-Mor’s thick shell plating presented good resistance to the shock wave generated by the explosion, and the heavy section box keel was able to resist bending forces set up by the pulse bubble underneath the vessel. The main seawater inlet valve was sheared either by the effect of the seawater system being pressured by the shock wave, or by the displacement of the machinery it was connected to. The sheared seawater inlet valve allowed water to enter and flood the engine room. Although the transverse bulkheads had buckled, they remained intact and prevented the seawater transferring to other compartments. Galwad-Y-Mor’s machinery mountings and internal fit out were damaged because they were not designed to withstand the forces created by the action of the vessel being thrown about. 2.2.5 Anticipation of the danger from unexploded ordnance Both Galwad-Y-Mor and Ingenuity had fished for crabs in the vicinity of the accident for many years and had not experienced any previous UXO interactions. The seabed positions of air-dropped UXO are unmarked on UKHO charts and are largely unknown, apart from sporadic at-sea findings recorded by the RoW and offshore installation licensing authorities. Consequently, the crew could not have known of the impending danger from the fouling of a bomb and its ensuing explosion. If the bomb had not exploded and been hauled on board, the information contained within MGN 323 (M+F) would have helped the crew deal with the bomb and notify the appropriate authority.
26 2.2.6 UXO location information available to fishermen Apart from known ammunition dumping grounds that are marked on navigation charts, there is little information readily available to fishermen concerning the presence of UXO on the seabed. No single authority holds data concerning the location of UXO found on the seabed. Information is held by the RoW, the UKHO, The Crown Estate, and commercial owners or installers of offshore infrastructure such as wind farms, pipelines and cables. It is known that some areas around the UK were subjected to more wartime activity than others. For example, the Strait of Dover, the River Thames and estuary, and the areas around naval ports. While it may be possible to infer from this that there is a greater potential risk of encountering wartime UXO, many of these areas have been fished since 1945 without apparent incident. Although the requirement to report UXO encounters to the RoW and Coastguard exists within MGN 323, anecdotal evidence suggests that there is significant under-reporting. 2.3 POST-ACCIDENT 2.3.1 Emergency response The crew’s actions after the explosion were both prompt and effective; five of the seven crew were significantly injured and yet they were able to send a distress message, launch a liferaft, and evacuate to Esvagt Njord’s rescue boats. It is likely that Galwad-Y-Mor crew’s formal training, emergency drills, and combined length of onboard service prepared them to deal with this unforeseen emergency scenario and enabled them to take swift action that, undoubtedly, saved lives. The emergency response and rescue that Esvagt Njord provided was also prompt and effective. The onboard triage of the casualties was aided by the presence of a trained paramedic and increased the survivability of Galwad-Y-Mor’s injured crew members. 2.3.2 Vessel survivability Galwad-Y-Mor remained afloat despite having one flooded compartment that caused the vessel to settle low in the water close to its maximum draught of 3.6m at the stern. The flooding of the engine room increased the vessel’s draught and reduced the freeboard to such an extent that the main deck was at sea level, which allowed seawater onto the deck. As all main deck watertight doors and hatches were closed, and the transverse main deck bulkheads remained watertight, the seawater was prevented from entering other compartments, and the stability of the vessel was not compromised further. Despite severe damage and flooding, Galwad-Y-Mor had good reserve buoyancy. However, it was fortunate that the weather conditions were favourable, which reduced the risk of the vessel capsizing while under tow to a place of safety.
27 SECTION 3 – CONCLUSIONS 3.1 OTHER SAFETY ISSUES DIRECTLY CONTRIBUTING TO THE ACCIDENT
Galwad-Y-Mor was severely damaged and its crew injured because a German high explosive bomb, dropped during WWII, exploded on the seabed beneath it. It is highly likely that the bomb was a WWII German HE SC250 air-dropped bomb. [2.2.1]
Even after many years of submersion, UXO can be highly volatile, become unstable, and explode unexpectedly. [2.2.1]
Galwad-Y Mor’s potting gear disturbed the bomb and it subsequently exploded. [2.2.2]
The bomb’s explosion released a gas bubble and pressure wave that threw Galwad- Y-Mor about on the surface, causing significant injuries to crew and damage to the vessel. The effect of the explosion could have resulted in multiple fatalities. [2.2.1, 2.2.3]
Galwad-Y-Mor’s machinery, on board equipment and internal outfitting were considerably damaged, but its hull was strong enough to withstand the forces generated by a nearby seabed explosion, which went far beyond the hull’s design requirement. [2.2.4]
There were no records or information available to fishermen that could have alerted Galwad-Y-Mor’s skipper to the risk of snagging unexploded ordnance in the area where he had laid his pots. [2.2.6]
Although Galwad-Y-Mor’s crew could not have anticipated the fouling of a bomb in the potting string, their training, experience, length of service together and emergency preparedness improved their chances of survival. [2.3.1]
Although Galwad-Y-Mor flooded during the accident, the vessel’s reserve buoyancy and calm weather conditions meant the vessel did not capsize. [2.3.2]
28 SECTION 4 – ACTION TAKEN 4.1 MAIB ACTIONS The MAIB has:
● On 21 December 2020, published a preliminary assessment14 into the Galwad-Y- Mor accident. SECTION 5 – RECOMMENDATIONS In view of the actions already taken, no recommendations have been made. 14 https://www.gov.uk/government/publications/preliminary-assessment-galwad-y-mor/explosion-resulting-in- damage-to-fishing-vessel-galwad-y-mor.
Marine Accident Report
FD06068 | 2021_英国_carbon-monoxide-poisoning-on-motor-cruiser-diversion-with-loss-of-2-lives__2021-03-Diversi.pdf
分类:06_境外及港澳台调查报告 | 年份:2021 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
M A R I N E A C C I D E N T I N V E S T I G AT I O N B R A N C H ACCIDENT REPORT ACCIDENT REPORT VERY SERIOUS MARINE CASUALTY REPORT NO 4/2021 APRIL 2021 Carbon monoxide poisoning on board motor cruiser Diversion, resulting in two fatalities at the Museum Gardens quay, River Ouse, York on 4 December 2019 1 Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an such investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2021 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. All reports can be found on our website: www.gov.uk/maib For all enquiries: Email: maib@dft.gov.uk Tel: 023 8039 5500 SUMMARY At about 2000 on 4 December 2019, the bodies of two men were discovered in the forward cabin of the 9.14m motor cruiser Diversion, which was moored to a quay on the River Ouse (Figure 1) in the centre of York, England. The bodies were those of the vessel owner and his friend who had spent the previous evening in the city centre socialising with former work colleagues and were spending the night on board. Both men had died as a result of carbon monoxide poisoning. The MAIB investigation concluded that: • The carbon monoxide had leaked into the cabin from the boat’s diesel-fuelled cabin heater exhaust. • The cabin heater’s exhaust silencer was not designed for marine use. Its connection to the exhaust pipe system was not gas tight, the installation had not been checked by a professional heater installer, and it had not been serviced. • The cabin ventilation system did not meet the requirements of the Boat Safety Scheme and this might have increased the rate at which the carbon monoxide accumulated in the boat’s cabin space. • The owner and his friend were not alerted to the danger because a carbon monoxide alarm had not been fitted. Figure 1: Diversion moored in York
2 As a result of the investigation’s initial findings, the MAIB issued safety bulletin number SB2/2020, highlighting the importance of having diesel-fuelled cabin heater installations checked and regularly serviced, and also the requirement to have a carbon monoxide alarm fitted. The safety bulletin has been referenced in Boat Safety Scheme publications and has been featured in the 2020 Carbon Monoxide awareness week. FACTUAL INFORMATION Narrative At about 1200 on 3 December 2019, the owner and two of his friends made their way onto the motor cruiser Diversion at its mooring in York Marina. Once on board, they readied the boat for a 4 mile trip upriver to York city centre, where they had arranged to attend a pre-Christmas social gathering with former work colleagues. They left the marina at about 1230 for York, where the owner and one of his friends planned to sleep on board Diversion overnight. During the trip the owner used the stove in the main cabin to make coffee while one of his friends steered the boat. It was a cold, clear day so the owner also turned on the boat’s diesel-fuelled cabin heater. At about 1330, they arrived in the city centre and moored Diversion on the northern bank of the river, adjacent to Museum Gardens. At about 1400, the three men went ashore, and spent the afternoon drinking and socialising with their former colleagues in several city centre pubs. One of the owner’s two friends had to return home in the early evening and left them at about 1930 to catch a train. The owner and his remaining friend had a meal with some of the group then returned to Diversion at about 2200, and prepared to go to bed. At about midday on the following day, the families of the owner and his friend became concerned that they had not heard from either man. They made several telephone calls to try to locate them, but without success, and later in the afternoon they reported their concerns to the police. A police officer was dispatched to the quayside and confirmed that the boat was still moored there, and that its accommodation was in darkness and no one appeared to be on board. The officer was then instructed to continue on patrol. With no further contact from the two men, the families contacted the police once again to express their increasing concern. At about 2000, another police officer boarded Diversion and found the main cabin door unlocked, with all lights switched off. The police officer entered the boat and found the bodies of the owner and his friend in the forward cabin bunk space; one was lying on the floor, the other was seated on the forward cabin entrance steps, and it was apparent that they had prepared themselves to go to bed. The police officer immediately called for backup and, at 2045, the Fire and Rescue Service arrived on the boat. They tested the atmosphere in Diversion’s accommodation and declared it safe for entry. Paramedics entered the boat and at 2115 the owner and his friend were declared deceased. Diversion was towed back to York Marina on 7 December 2019, where it was secured by the police. On 9 December post-mortems were carried out, which found that the primary cause of death for both men was carbon monoxide (CO) poisoning; both also had caffeine and alcohol in their system. The accident was not reported to the MAIB until June 2020; the investigation started shortly afterwards. The casualties Diversion’s owner, Ronnie Holmes, was 60-years-old and had worked as a power station engineer for over 30 years. He retired in 2015 and spent his time carrying out home improvements, fixing motorcycles and boating. Before retirement he had enjoyed scuba diving with friends.
3 Stephen Jewitt had retired around the same time as Ronnie, was 63-years-old and had worked as an engineer at the power station, where he met and became friends with Ronnie. Stephen also owned a boat which he had used for diving trips with Ronnie. Vessel description Diversion was a 9.14m steel hulled boat (Figure 2) that had been built by its owner based on plans purchased from boat designer Bruce Roberts. The owner had started the construction of Diversion in 1990 and built it over a period of 11 years on land behind his home. The boat was launched at York Marina in 2001, where it was based for the next 19 years. The owner used Diversion predominantly on the River Ouse, and frequently entertained family and friends on board. During the build, the owner had made several alterations to the design, which included the installation of a second engine and changes to the cabin arrangements. The forward cabin was fitted with twin bunk beds and was wood lined, but it had no thermal insulation to the hull. The steering wheel, engine throttles and engine control console were located on the starboard side of the main cabin, and there was a 4kW1 twin burner methylated spirit stove on the port side. In 2018, the owner fitted a second-hand diesel- fuelled cabin heater that he had purchased from an auction website. The owner had also purchased a portable petrol generator and coupled it up to a 24V battery charger in the engine space. Two spare back-up batteries had been placed in the engine bay by the owner before they left York Marina. Diversion was licensed by the Canal and River Trust to operate on the River Ouse and was examined under the Boat Safety Scheme (BSS) as a mandatory requirement of this licence. 1 kW – Kilowatt Figure 2: Diversion general arrangement Toilet/washroom Main cabin Forward cabin Steering console Engine bay
4 Boat Safety Scheme The BSS is a public safety initiative, jointly owned by the Canal and River Trust and the Environment Agency. The purpose of the BSS is to help minimise the risk of boat fires, explosions, or pollution from harming third party users of the waterways. Approximately 60,000 BSS boat examinations are carried out by BSS accredited examiners every 4 years. Their checks are visual and do not involve disassembly of equipment. The BSS states on its website that its examinations are not a full condition survey and that owners should ensure boats and appliances are competently installed and serviced according to manufacturer’s instructions. On 1 April 2019, BSS had amended its requirements to include a working CO alarm2. The BSS extensively publicised this requirement on its website and in boating publications but found that about 10% of the boats presented for examination in the year April 2019 to April 2020 did not have a CO alarm fitted. Diversion did not have a CO alarm fitted at the time of the accident or when it was last presented for a BSS examination in February 2019. The owner was not present at the BSS examination and was not advised of the imminent requirement to install a CO monitor in the examination report. Documentary evidence indicates that a CO alarm had been fitted previously, but the reasons for its subsequent removal prior to the survey in February 2019 are unknown. On board investigation and tests MAIB did not become aware of the accident until June 2020, consequently testing of equipment onboard was carried out under warm summer conditions. It is possible, therefore, that the performance of the cabin ventilation during the wintery conditions at the time of the accident differed from those found during testing. Four potential sources of CO were found on board Diversion when the boat was inspected. These were the main engines, portable generator, cabin stove and cabin heater; all were subject to onboard examination and testing. The boat’s engines and portable generator were not running when the police first boarded the boat. The evidence indicated that they were not running at the time of the accident. When they were tested, no exhaust gas leaks were found, and no CO was measured within the boat’s accommodation. The methylated spirit fuelled stove was found turned off and both burner reservoirs contained fuel. When the stove was lit, the CO emissions measured in the main cabin initially exceeded 20ppm3 but dropped to approximately 10ppm once the burners were warm. When the emergency services arrived on board the boat, the diesel-fuelled heater was found to be powered up, but it had switched itself into the standby mode and was not operating. When tested on board, the heater was observed to emit approximately 20ppm of CO from its external exhaust, and CO was detected in the cabin spaces after the heater had been run for extended periods. CO levels in excess of 50ppm were measured in the main cabin more than 16 hours after the heater had been shut down. The cabin heater Diversion’s cabin heater was an Eberspächer 1.8kW D1LC air heater. It was installed in a cabinet in the main cabin beneath the steering console and was operated from a panel mounted on the top of the console. Circulating air was drawn from inside the cabinet, warmed by the heater, and discharged to the boat’s main cabin via a nozzle mounted at deck level next to the steering position (Figure 3). The cabin temperature was set by means of an adjustable control knob, and the heater started and stopped thermostatically. The heater also drew its combustion air from inside the cabinet, and a pump supplied diesel fuel from the boat’s port side fuel tank. The fuel/air mixture was burned in the heater, 2 alarm meeting safety standard EN 50291-2:2010, 3 ppm – parts per million
5 Figure 3: Installation of Diversion’s cabin heater Heater circulating air outlet Heater under console
6 and the exhaust gases containing CO and carbon dioxide (CO2) were discharged outside via a silencer connected to a through-hull fitting on the starboard side. The exhaust system was fully insulated with heat proof fibreglass and covered by foil tape. The manufacturer’s installation instructions, available via the internet, provided guidance regarding the requirements of the heater’s fuel system, exhaust, combustion air, electrical connection and circulating air. It is unknown if the owner read the instructions before he installed the heater and there was no record to indicate the installation was checked by an approved Eberspächer agent, or of the heater being serviced since it was fitted. The heater’s exhaust lagging was removed to enable closer inspection of the system, which comprised of a Webasto exhaust silencer, connected to the heater and boat’s side via flexible pipes. The Eberspächer heater exhaust port had a 24mm outside diameter stub pipe, but the Webasto silencer inlet had a 22mm outside diameter stub pipe. This meant that the two sizes were incompatible, and the flexible exhaust that connected the heater to the silencer was loose, and leaked exhaust gas. In addition, the silencer had spot welded seams and a condensate drain hole, which also leaked exhaust gas when the heater ran (Figure 4). Figure 4: Gas leak path from condensate drain and spot welded seam The most well-known brands of diesel-fuelled heaters are Webasto and Eberspächer. These are commonly installed into lorries, earth moving machinery, caravans and boats. Diversion’s Webasto silencer was not designed to be fitted in marine installations because it was not gas tight and it was incompatible with the exhaust piping. As a result, the leaking exhaust gas was drawn into the heater’s circulating air inlet and then blown into the main cabin (Figure 5). The heater would often be left running while the owners were ashore when using Diversion on cold days. On one occasion in October 2019, the owner and his wife experienced nausea and sickness after sleeping on board with the cabin heater running. Exhaust silencer as found Exhaust silencer removed Exhaust gas leakage path from loose inlet pipe connection Gas leak path from condensate drain and riveted seam
7 Figure 5: Leakage path of exhaust gas through cabin heater Examination and testing of the cabin heater The heater and associated equipment were removed from the boat and taken to an Eberspächer service agent for extensive examination and testing. The heater’s service panel cover was found to have an unbroken seal across it, confirming that it had not been serviced since installation. The heater’s internal glow plug was in good condition and there were no soot deposits found. The heater was found to start and stop thermostatically as per the manufacturer’s design, and the low supply voltage cut-out switched the heater to standby mode at 21V. Exhaust gas readings were close to design specifications with no trace of CO found at the circulating air outlet. The heater was then retested with its exhaust silencer positioned adjacent to the circulating air intake, comparable to the ‘as found’ arrangement on board Diversion. Leaking exhaust gas from the exhaust silencer’s seams, condensate drain, and loose inlet connection was sucked into the heater’s circulating air inlet and approximately 8ppm CO was then measured at the circulating air outlet. It was noted that an onboard heater service would include a check of the glow plug, exhaust gas analysis, visual assessment of the installation while the heater was running, and a test of the circulating air for any trace of combustion gas such as CO2 or CO. Air/CO mix blown into cabin Exhaust leaks ingested into heater circulation air inlet Air/CO mix ingested into heater combustion inlet pipe Air/CO from cabin returns to heater circulation air inlet
8 Cabin ventilation Boat cabins are often fitted with ventilation to provide fresh air for boat users and combustion air for fossil fuel burning cookers, water heaters, wood burners and diesel-fuelled air heaters. Insufficient air supply leads to incomplete combustion within such appliances and a discharge of unburnt fuel and higher than normal levels of CO from their exhaust systems. Diversion’s upper-level ventilation consisted of four mushroom type vents mounted in the roof of the accommodation. The two forward vents provided ventilation to the forward cabin space. These vents were permanently open, had no closing mechanism, and were found to be clear of obstruction. The two aft vents were mounted in the roof of the main cabin and had dampers fitted into them that were found in the closed position. Low level ventilation was provided via a louvre type grille mounted in the bottom of the cabin door. Holes had been drilled through the door behind the grille, and approximately half of these were found to be blocked with dust. This reduced the effective capability of the ventilator grille (Figure 6). The BSS used a standard formula4 for calculating minimum ventilation requirements when they examined Diversion. This formula used values based on the thermal output rating of fossil fuel burning appliances installed, and the number of persons for which the accommodation space was designed. There were some errors found in the application of the formula during the 2019 BSS examination of Diversion: an incorrect low thermal rating of the stove was used, and the cabin heater was not included. Additionally, there was a miscalculation of the available ventilation on board because the closable mushroom vents were included, in error. 4 derived from BS 5482—3 Annex G (Code of Practice for the installation of solid fuel heating and cooking appliances – Part 3: Installations in boats, yachts and other boats), Figure 6: Wheelhouse dour louvre vent Holes blocked Holes behind louvre grille
9 As part of the investigation, the BSS formula was used to re-assess Diversion’s ventilation requirement, and to re-calculate the actual available ventilation on board. It was found that the available ventilation was approximately 60% of the minimum required (Table 1). Table 1: Comparison of ventilation requirement and ventilation availability BSS calculated minimum ventilation requirement Feb 2019 BSS calculated available ventilation Feb 2019 MAIB calculated minimum ventilation requirement MAIB calculated available ventilation 9200 mm 18469 mm2 12192 mm2 7304 mm2
Carbon monoxide poisoning CO is a highly poisonous gas that weighs nearly the same as air and cannot be seen, smelled, tasted or felt by humans. CO readily replaces oxygen in the human bloodstream by forming carboxyhaemoglobin, which prevents oxygen from being supplied to the heart, brain and other vital organs. The blood carboxyhaemoglobin saturation level found during the post-mortem examinations of Diversion’s owner and his friend were 58.7% and 61.8% respectively; blood carboxyhaemoglobin saturation more than 50% is lethal to humans. Common symptoms of low exposure to CO poisoning include headache, nausea, stomach pain, difficulty breathing, or feeling tired or confused. In greater concentrations a person will feel drowsy and lethargic and may have difficulty moving around. The symptoms of carbon monoxide exposure continue to intensify as the concentration or time frame increases. An exposure at 800ppm can kill the person within a few hours, at 1500ppm it can cause death within an hour, at 3000ppm within half an hour and at 6000ppm death can occur within 15 minutes. Furthermore, exposure at 12,000ppm can result in instant death for the person. Similar accidents In November 2016, the owner of pleasure boat Vasquez5 was overcome and died as a result of CO poisoning, which had leaked from the petrol engine’s exhaust system. The exhaust system had been extensively modified and the engine had not been regularly serviced. No CO alarm was fitted on board. In June 2016, two fatalities resulted from CO poisoning on the motor cruiser Love for Lydia6 . The petrol- driven inboard engine had been left running while alongside, probably to charge batteries. The exhaust from the engine filled the cockpit canopy and spread into the cabin. There was no CO alarm fitted on board and the occupants were overcome by the fumes. The MAIB made recommendations to the Maritime and Coastguard Agency regarding the co-ordination of raising CO awareness of the leisure boating community; to British Marine to seek clarification on CO requirements within the recreational craft directive; and to the BSS regarding the compulsory installation of CO alarms in craft participating in the BSS scheme. In April 2014, two recreational boat users died of CO poisoning while sleeping on board the motor cruiser Arniston7 . The owner had fitted a portable generator in the boat’s engine compartment and rigged an exhaust system to discharge combustion gases overboard. The exhaust system failed, and fumes filled the motor cruiser’s cabin. The occupants had not been alerted to the presence of CO because the alarms fitted on board did not work. In January 2014, two fishermen died from CO poisoning on board the scallop dredger Eshcol8 . A butane fuelled cooker grill, which leaked CO, had been left on to warm the boat’s cabin as the crew slept. There was no CO alarm fitted and it is believed the cooker had never been serviced. 5 MAIB report 18/2017 6 MAIB report 9/2017 7 MAIB report 2/2015 8 MAIB report 14/2014
10 ANALYSIS Overview The two men on board Diversion died from CO poisoning due to a build-up of exhaust gas within the cabin spaces. The gas leaked from the cabin’s air heater exhaust silencer and a loose exhaust pipe connection. The nausea experienced by Diversion’s owner and his wife 2 months earlier was probably caused by CO poisoning from the cabin heater exhaust leaks. The accumulation of carbon monoxide Because it was a cold day and Diversion’s hull was uninsulated, the boat’s cabin heater was turned on shortly after leaving York Marina. It is likely that the heater was left running when the friends went ashore so that the accommodation would be warm on their return later that evening. When the heater was running, small amounts of the leaking exhaust gas were drawn into the heater’s circulating air intake and then discharged into the main cabin. Over a period of hours, the air in the main and forward cabins became increasingly polluted with CO and CO2. As the heater continued to operate, its combustion air drawn from inside the boat also became increasingly saturated with exhaust gases, and as a result the quality of combustion within the heater reduced. This added to the increased amount of CO in the exhaust gas and further polluted the air inside the boat. The evidence of caffeine found during the post-mortem examinations of both men suggests it is possible that when they returned to Diversion and went inside, they had a coffee before going to bed. Once inside the boat, they would have started to breathe in the CO enriched atmosphere, and it is likely that the effects of alcohol consumption made them unaware of the early signs of CO poisoning. As the men prepared to go to sleep in the forward cabin it was apparent that they were both overcome by CO, rendered quickly unconscious, and later died. The cabin heater would have continued to operate until Diversion’s battery voltage dropped to approximately 21V. The heater then automatically shut down to standby mode, which stopped additional build-up of CO inside the boat. The cabin heater The undamaged heater glow plug indicated that the heater had not been used frequently. The tests showed that the heater unit had no internal exhaust gas leaks and was in good working order. It is not known whether the Webasto exhaust silencer was an original fit to a previous heater, was supplied with the replacement Eberspächer heater unit, or was purchased separately. However, the silencer was not approved for marine use and was designed to be fitted externally. The gas leaks from its body, the condensate drain hole, and from the loose pipe connection, were obscured by the exhaust insulation and were probably not noticed by the owner when he installed the heater. An Eberspächer service agent appraisal of the heater installation, which is recommended by BSS, would probably have highlighted the issues with both of these items. Also, a service agent’s circulating air test from the running heater would have shown the presence of CO, and both of these areas of concern would have been pointed out to Diversion’s owner for rectification. Cabin ventilation Without removing the louvre grille from the door, it was impossible to tell that the drilled holes behind it were mostly blocked. While this did not cause a problem when the door was opened frequently, allowing fresh air into the main cabin, when it was closed for long periods the air flow through the boat was impeded.
11 Because the calculation used at the time of the BSS examination of the boat was not accurate, the correct level of ventilation required was mis-identified, and the levels of available ventilation were overstated. The situation was made worse, because the ventilation holes in the main cabin door were partially blocked. Onboard testing in summer conditions demonstrated that CO tended to remain in the boat’s atmosphere for extended periods. The impeded air flow through the cabin vents would have increased the likelihood and rate that CO accumulated within the cabin space. Carbon monoxide alarms Because a BSS examination is required to be carried out only every 4 years, it is feasible that some boat owners may not comply with the CO alarm installation requirement that came into force in April 2019 until their boat is next examined. This could be as late as 2023; which was the case for Diversion. It is surprising that the imminent requirement to have a CO monitor installed to Diversion was not highlighted during the last BSS examination. Taking into account the statistical 10% noncompliance rate at the time of being presented for examination, this could mean that more than 4000 BSS examined boats may not currently have a CO alarm fitted, representing a potential CO poisoning risk to the owners. On board Diversion, because there was no CO alarm fitted, neither the owner nor his friend were alerted to the presence of dangerous levels of CO within the cabin. Since CO in the atmosphere is undetectable by humans until the effects of poisoning start to become apparent, the installation of an alarm may be the final defence available to protect individuals. When a CO monitor goes into alarm, it should never be ignored, or considered to be defective. CONCLUSIONS • Diversion’s owner and his friend died after being poisoned by CO that had leaked from the boat’s cabin heater exhaust system and accumulated in the accommodation spaces. • Diversion’s owner had fitted the cabin heater using some non-marine components which allowed the exhaust to leak. • The CO leaks had not been identified because the diesel-fuelled heater installation had not been checked by an approved installation engineer, nor had it been serviced. • CO accumulated in the forward cabin to a lethal level and the cabin ventilation system, which was partially restricted, did not allow the CO to clear. • The casualties were not alerted to the danger because a CO alarm had not been fitted. ACTIONS TAKEN MAIB actions The MAIB issued Safety Bulletin SB2/20209 on 15 October 2020. Actions taken by other organisations The BSS has extensively published references to Safety Bulletin SB2/2020 and it has been featured in 2020 CO awareness week, which took place from 23 to 29 November. RECOMMENDATION As a result of the actions taken, no recommendations have been made. 9 MAIB safety bulletin SB2/2020
12 VESSEL PARTICULARS Boat’s name Diversion Type Motor cruiser Registered owner Privately owned Year of build 1990-2001 Construction Steel Length overall 9.14m Gross tonnage 7 Tonnes (approximately) VOYAGE PARTICULAS Port of departure York Marina, Naburn Port of arrival York City Type of voyage Pleasure MARINE CASUALTY INFORMATION Date and time Overnight 3 to 4 December 2019 Type of marine casualty or incident Very Serious Marine Casualty Location of incident Moored at Museum Gardens quay, York Place on board Forward cabin Injuries/fatalities 2 fatalities Damage/environmental impact None External environment 2ºC Wind southerly 5mph Persons on board 2
FD06069 | 2021_英国_cargo-tank-explosion-and-fire-on-chemical-tanker-stolt-groenland__2021-09-StoltGroenland-R.pdf
分类:06_境外及港澳台调查报告 | 年份:2021 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
ACCIDENT REPORT ACCIDENT REPORT INVESTIGATED BY THE MAIB ON BEHALF OF THE CAYMAN ISLANDS GOVERNMENT Red Ensign Group logo Cayman Maritime logo Report on the investigation of the cargo tank explosion and fire on board the chemical tanker Stolt Groenland Ulsan, Republic of Korea 28 September 2019 SERIOUS MARINE CASUALTY REPORT NO 9/2021 JULY 2021
This investigation was carried out by the UK Marine Accident Investigation Branch (MAIB) on behalf of the Cayman Islands Government in accordance with the Memorandum of Understanding between the MAIB and the Red Ensign Group Category 1 registries of Isle of Man, Cayman Islands, Bermuda and Gibraltar. Extract from The Cayman Islands Merchant Shipping (Marine Casualty Reporting and Investigation) Regulations, 2018 – Regulation 4: “The sole objective of a marine safety investigation into an accident under these Regulations shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It is not the purpose of a marine safety investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 22 of The Cayman Islands Merchant Shipping (Marine Casualty Reporting and Investigation) Regulations, 2018, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes, is to attribute or apportion liability or blame. All MAIB publications can be found on our website: www.gov.uk/maib Front cover image courtesy of Lappino (shipspotting.com) For all enquiries: Marine Accident Investigation Branch First Floor, Spring Place 105 Commercial Road Southampton SO15 1GH United Kingdom Email: maib@dft.gov.uk Telephone: +44 (0)23 8039 5500 Press enquiries during office hours: +44 (0)1932 440015 Press enquiries out of hours: +44 (0)300 7777878 Maritime Authority of the Cayman Islands Breezy Castle Unit 1 125 Owen Roberts Drive P.O. Box 2256 Grand Cayman KY1-1107 www.cishipping.com/contact-us © Crown copyright, 2021 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned.
CONTENTS GLOSSARY OF ABBREVIATIONS AND ACRONYMS SYNOPSIS 1 SECTION 1 – FACTUAL INFORMATION 2 1.1 Particulars of Stolt Groenland and accident 2 1.2 Narrative 3 1.2.1 Passage and cargo discharge 3 1.2.2 Explosions 7 1.2.3 Emergency response 7 1.3 Environmental conditions 10 1.4 On-site investigation 10 1.5 Damage 10 1.6 Onboard records 11 1.7 Styrene monomer 12 1.7.1 Description 12 1.7.2 Polymerisation 16 1.7.3 Polymerisation inhibitors 16 1.8 Cargo system 18 1.9 Loading in Houston 18 1.9.1 Planning and documentation 18 1.9.2 The cargo 20 1.9.3 Styrene and inhibitor mixing 21 1.9.4 Styrene sampling 21 1.10 Cargo temperature changes during the voyage 23 1.11 Crew 25 1.11.1 General 25 1.11.2 Master 25 1.11.3 Chief officer (Ulsan) 25 1.11.4 Chief officer (loading and voyage) 25 1.11.5 Voyage routines 25 1.12 Cargo management ashore 26 1.13 Onboard cargo procedures 27 1.13.1 Planning and stowage 27 1.13.2 Cargo monitoring 27 1.14 IBC Code 27 1.15 Shipping industry guidance 29 1.15.1 Tanker Safety Guide 29 1.15.2 Chemical Distribution Institute Guidance 29 1.16 Storage and handling guidance 30 1.16.1 Styrene Monomer: Safe Handling Guide (2018) 30 1.16.2 Safe handling sheets 31 1.16.3 Safety data sheets 32 1.17 Recent inspections, audits and vetting 32 1.18 Yeompo Quay 32 1.19 Styrene monomer accidents and incidents 33 1.19.1 Stolt Focus 33 1.19.2 Other maritime accidents 34 1.19.3 Shore-based accidents 34 1.20 Styrene sample and overall analysis results 35
SECTION 2 – ANALYSIS 37 2.1 Aim 37 2.2 Explosion and fire mechanisms 37 2.3 Initiation of polymerisation 37 2.4 Heat transfer 38 2.5 Polymerisation inhibitor mixing 39 2.6 Polymerisation inhibitor depletion 39 2.7 Cargo stowage 40 2.8 Temperature monitoring 42 2.9 Action in the event of polymerisation 43 2.10 Fire-fighting 44 2.11 Stolt Focus incident 44 SECTION 3 – CONCLUSIONS 46 3.1 Safety issues directly contributing to the accident that have been addressed or resulted in recommendations 46 3.2 Safety issues not directly contributing to the accident that have been addressed or resulted in recommendations 47 3.3 Other safety issues not directly contributing to the accident 47 SECTION 4 – ACTION TAKEN 48 4.1 MAIB actions 48 4.2 Actions taken by other organisations 48 SECTION 5 – RECOMMENDATIONS 49 FIGURES Figure 1: Ofdjell terminal and Yeompo Quay, Ulsan Figure 2: Cargoes remaining following discharge in Ulsan Figure 3: CCTV still showing vapour release from 9S p/v valve Figure 4: CCTV still showing tank rupture and vapour release Figure 5: CCTV still showing vapour ignition Figure 6: Fireball at Ulsan bridge Figure 7: Bow Dallian main deck with burned styrene deposits Figure 8: Styrene residue sample Figure 9: Overalls from Bow Dallian crewman Figure 10: 9S heating control valves
Figure 11: Aerial view of main deck and location of 9S Figure 12: 9S tank rupture Figure 13: 9S access hatch Figure 14: Midships deckhouse Figure 15: Accommodation interior Figure 16: Accommodation front Figure 17: Cargo temperatures recorded on the VDR Figure 18: Certificate of Inhibitor
Final sample analysis results
9S Styrene Monomer Temperature 20-28 September TABLES
Table 2: Temperatures of cargoes discharged in Kobe and Ulsan
Table 4: TBC depletion in styrene (if stored under air)
Table 8: Calculated TBC depletion using figures provided in the Plastics Europe Styrene Monomer: Safe Handling Guide (2018)
GLOSSARY OF ABBREVIATIONS AND ACRONYMS
2/O
Second officer
3/O
Third officer
ACA
American Cargo Assurance
AIS
Automatic identification system
CCR
Cargo control room
CDI
Chemical Distribution Institute
C/O
Chief officer
ERT
Emergency Response Team
HMD
Hexamethylenediamine
IBC Code
International Code for the Construction and Equipment of Ships Carrying Dangerous Chemicals in Bulk
IMO
International Maritime Organization
Ineos
Ineos Styrolution America LLC
INTERTANKO
International Association of Independent Tanker Owners
iStow
iStow Tanker cargo stowage software
KMST
Korea Maritime Safety Tribunal
LPD
LPD Lab Services Limited
m
metre
m³
cubic metres
mb
millibar
MARPOL
International Convention for the Prevention of Pollution from Ships
MCO
Marine Compliance Officer
OS
Ordinary seaman
OTK
Odfjell terminal in Ulsan, Republic of Korea
ppm
parts per million
PTZ
Phenothiazine
p/v
Pressure/vacuum
SDS
Safety Data Sheet
SHC
Specific Heat Capacity
SMS
Safety Management System
SOLAS
International Convention for the Safety of Life at Sea 1974, as amended
ST B503
Shore Tank 503
STCW
International Convention on Standards of Training, Certification and Watchkeeping for Seafarers 1978, as amended (STCW Convention)
Stolt
Stolt Tankers B.V.
t
tonne
TBC
4-tert-Butylcatechol
TEA
Triethanolamine
TSG
Tanker Safety Guide
UTC
Universal co-ordinated time
VCR
Voyage cargo report
VDR
Voyage data recorder
Voranol
Glycerol, propoxylated and ethoxylated
YMP3
Yeompo Quay, berth 3 TIMES: all times used in this report are UTC + 9 unless otherwise stated.
Stolt Groenland Permission requested via email. Image courtesy of Hannes van RijnThe chemical tanker Stolt Groenland at sea
1 SYNOPSIS On 28 September 2019, a cargo tank containing styrene monomer on board the Cayman Islands registered chemical tanker Stolt Groenland ruptured causing an explosion and fire. The tanker was moored alongside a general cargo berth in Ulsan, Republic of Korea and the Singapore registered chemical tanker Bow Dalian was moored outboard. The ignition of the styrene monomer vapour resulted in a fireball, which reached the road bridge above. Both vessels were damaged, and two crew suffered minor injuries. Fifteen emergency responders were injured during the fire-fighting, which lasted for over 6 hours. The rupture of the styrene monomer tank resulted from a runaway polymerisation that was initiated by elevated temperatures caused by heat transfer from other chemical cargoes. The elevated temperatures caused the inhibitor, added to prevent the chemical’s polymerisation during the voyage, to deplete more rapidly than expected. Athough the styrene monomer had not been stowed directly adjacent to heated cargo, the potential for heat transfer through intermediate tanks was not fully appreciated or assessed. Critical temperature limits had been reached before the vessel berthed under the road bridge in Ulsan. The tanker’s crew did not monitor the temperature of the styrene monomer during the voyage, and therefore were not aware of the increasingly dangerous situaution. A similar dangerous styrene monomer polymerisation incident had occurred a couple of weeks ealier on board another Stolt Tankers B.V. ship, Stolt Focus. The heat generated by the polymerisation process was noticed before the critical runaway temperature was reached. The styrene momomer cargoes on board both tankers was loaded at a similar time from the same tank in Houston and were exposed to similar environmental conditions. The incident on board Stolt Focus was not reported to the ship’s Flag State or other masters in the Stolt Tankers B.V. fleet. Following the accident, the Ministry of Oceans and Fisheries, Republic of Korea, prohibited ship-to-ship transfer operations for dangerous cargo on general cargo berths in Ulsan. Stolt Tankers B.V. took immediate action to ensure that the temperatures of all cargoes carried on board its ships were monitored and reported to its shore management. It also took steps to enhance crew awareness on the hazards of inhibited and heat sensitive cargoes. The company is developing technological and administrative initiatives to assist with the safe stowage and monitoring of heat sensitive cargoes. A recommendation has been made to Stolt Tankers B.V. aimed at ensuring the wider marine chemical sector benefits from the lessons learned from the Stolt Focus incident and research initiatives that were carried out as a result of this accident. Recommendations have also been made to the Cayman Island Shipping Registry, the Chemical Distribution Institute and Plastics Europe (Styrene Producers Association). These are intended to assist in ensuring that the guidance provided in certificates of inhibitor and styrene monomer handling guides is consistent and achievable given the limitations of equipment and testing facilities on board ships.
2 SECTION 1 – FACTUAL INFORMATION 1.1 PARTICULARS OF STOLT GROENLAND AND ACCIDENT SHIP PARTICULARS Vessel’s name Stolt Groenland Flag Cayman Islands Classification society Det Norske Veritas Germanischer Lloyd IMO number/fishing numbers 9414072 Type Chemical/products tanker Registered owner Stolt Tankers B.V. Manager(s) Stolt Tankers B.V. Construction Steel Year of build 2009 Length overall 182.72m Beam 32.24m Gross tonnage 25881 Deadweight 43478 Minimum safe manning 17 Authorised cargo Chemicals and oil products in bulk VOYAGE PARTICULARS Port of departure Kobe, Japan Port of arrival Ulsan, Republic of Korea Type of voyage International Cargo information Chemicals in bulk 27117 tonnes Manning 25 MARINE CASUALTY INFORMATION Date and time 28 September 2019 at 1050 Type of marine casualty or incident Serious Marine Casualty Location of incident Ulsan, Republic of Korea Place on board Cargo tanks and deck Injuries/fatalities 2 crew suffered minor injuries (1 on board Stolt Groenland and 1 on board Bow Dalian). 15 shore workers/officials were also reported to have been injured. The severity of their injuries is not known Damage/environmental impact Toxic vapour released to atmosphere Ship operation Moored alongside Voyage segment Moored alongside External & internal environment Daylight. Air temperature: 24ºC Wind: Light airs. Humidity 93% Persons on board 26
3 1.2 NARRATIVE 1.2.1 Passage and cargo discharge Between 2 and 17 August 2019, Stolt Groenland, a Cayman Islands registered chemical tanker operated by Stolt Tankers B.V. (Stolt), loaded 20 different chemical cargoes from terminals in Texas, USA. Cargo was carried in 37 of the tanker’s 39 cargo tanks for delivery in various ports in the Far East (Table 1). Tanks 3 Port (3P), 7 Starboard (7S), 8P, 9P, 10P, and 11P contained heated cargoes. The temperatures of the cargoes in 3P and 7S were required to be maintained at between 40ºC and 45ºC, and the temperatures of the cargoes in 8P, 9P, 10P, and 11P (Hexamethylenediamine (HMD)), the last cargo to be loaded, had to be maintained at between 45°C and 50°C. The temperature of the HMD at loading was 61°C. Table 1: Cargo stowage on departure from Houston on 17 August Detai ls of the car go stowage showing locations of h eated cargo and styrene monomer
4 The cargoes also included 5245t of styrene monomer, loaded on 7 and 8 August, which was divided among cargo tanks 6P (1789t), 6 Centre (6C) (1671t), and 9S (1785t), to which a polymerisation inhibitor had been added (see Section 1.7.2). The tanker sailed for passage to Japan on 17 August. Between 22 and 24 September, Stolt Groenland’s cargo tanks 5S, 8C (part cargo), 8S and 11C were discharged to barges while the vessel was at anchor off Kobe, Japan. The vessel then sailed to Ulsan, Republic of South Korea, where six tanks containing adiponitrile were discharged at the Odfjell terminal (OTK) on 26 and 27 September. During discharge on 26 September, the tanker’s chief officer (C/O) handed over to his relief, who had arrived shortly after the vessel moored alongside. The off-going C/O departed the vessel at about 1500. During the afternoon of 27 September 2019, Stolt Groenland shifted from the OTK to Yeompo Quay, berth 3 (YMP3) underneath the Ulsan Bridge (Figure 1). The tanker moored starboard side to the quay and during the evening, a cargo of Voranol was discharged from cargo tanks 10C and 11S to Stolt Voyager via ship-to-ship transfer. On completion, Stolt Voyager moored ahead of Stolt Groenland. The temperatures of the cargoes discharged in Kobe and at OTK recorded on the ullage reports are shown in Table 2. The attending cargo surveyor in Ulsan noticed that the temperature of the adiponitrile in 9C (48.8ºC) was elevated, but as it remained within the charterer’s specified maximum temperature of 50ºC, he did not discuss this with the C/O and no action was taken. The distribution of the cargoes remaining on board Stolt Groenland following the discharges in Kobe and OTK is shown at Figure 2. Table 2: Temperatures of cargoes discharged in Kobe and Ulsan Date Tank Cargo Place Discharge Temperature 22-23 Sep 5S Toluene Kobe, Japan 33.2°C 22-23 Sep 8C (part cargo) Triethanolamine (TEA) Kobe, Japan 43.6°C 22-23 Sep 8S ALFOL Kobe, Japan 39.1°C 22-23 Sep 11C MEA Kobe, Japan 48.2°C 26-27 Sep 1S ADIPONITRILE OTK, Ulsan 27.2°C 26-27 Sep 2P ADIPONITRILE OTK, Ulsan 30.0°C 26-27 Sep 3C ADIPONITRILE OTK, Ulsan 29.8°C 26-27 Sep 5C ADIPONITRILE OTK, Ulsan 30.5°C 26-27 Sep 6S ADIPONITRILE OTK, Ulsan 31.9°C 26-27 Sep 9C ADIPONITRILE OTK, Ulsan 48.8°C 27 Sep 10C VORANOL YMP3, Ulsan 46.0°C 27 Sep 11S VORANOL YMP3, Ulsan 38.4°C
5 Figure 1: Ofdjell terminal and Yeompo Quay, Ulsan Satellite image courtesy of Google Maps Satellite image shows Ofdjell terminal and Yeompo Quay, Ulsan Ofdjell terminal Yeompo Quay
6 Figure 2: Cargoes remaining following discharge in Ulsan Heated (3P, 7S, 8P, 9P, 10P and 11P) Empty (1S, 2P, 3C, 5C, 5S, 6S, 8S, 9C, 10C, 11C, 11S, 12P and 12S) Styrene monomer (6P, 6C and 9S) Other cargo (the tanks that are left) Plan il lust ration in dic ates position of heated, empty, styrene monomer and o ther cargo rem aining on Sto lt Groenland FORWARD PORT STARBOARD AFT Cofferdam Cofferdam
7 1.2.2 Explosions At about 0600 on 28 September, the Singapore registered chemical tanker Bow Dalian was secured alongside Stolt Groenland’s port side. The purging of Bow Dalian’s cargo tanks with nitrogen supplied from shoreside vehicles was then started in readiness for a ship-to-ship cargo transfer with Stolt Groenland. At 1043, vapour started to release from the pressure/vacuum (p/v) relief valve for Stolt Groenland’s 9S cargo tank (Figure 3). About 2 minutes later, the tank’s high-level alarm (indicating that the level in 9S cargo tank had reached 95%) activated the warning siren and strobe light on the bridge front. The warning indicators were noticed by the ordinary seaman (OS) on gangway watch, and he immediately notified the third officer (3/O), the on-watch deck officer, via hand-held radio. The 3/O was working in the master’s office and went to the unmanned cargo control room (CCR) to investigate. The OS’s radio transmission was also heard by the C/O, and he joined the 3/O in the CCR. Shortly afterwards, the high-high-level siren on the bridge front sounded, indicating that the level in 9S cargo tank had increased to 98%. The alarm was again reported by the OS. The C/O and 3/O saw from the cargo monitoring system that the pressure inside 9S cargo tank was 1340mb, and observed it rise quickly to 2000mb. At 1050, two explosions occurred in rapid succession in way of the vessel’s cargo manifold (Figure 4). The second explosion ignited the released styrene monomer vapour (Figure 5) and the resulting fireball passed very close to the road bridge above the quay (Figure 6). It also ignited vapours released from the 9S and 9C p/v valves. 1.2.3 Emergency response Stolt Groenland On board Stolt Groenland, the force of the second explosion blew the gangway watchman over the starboard side guardrails on the main deck. The OS initially held on to one of the rails, but he was soon forced to let go due to the heat from the fire. He fell into the water between the quay and the vessel, but he was able to climb over a fender and on to the quay. The C/O activated the fire alarm and the tanker’s crew mustered at their fire stations. The C/O also activated the deck foam monitor system and directed the port monitor toward the cargo manifold. The 3/O did likewise with the starboard monitor. However, the master soon ordered everyone to the lifeboat station on the boat deck due to the intensity of the fire and the thick black smoke. The crew used the freefall lifeboat to abandon the tanker. Bow Dalian Following the explosions, Bow Dalian’s C/O activated the vessel’s emergency alarm and the deck foam fire extinguishing system. He and the master also directed the monitors toward Stolt Groenland’s main deck and cargo manifolds. The crew then abandoned ship via a rope ladder on the vessel’s port side on to Korea Coast Guard vessels, which had arrived to assist.
8 Figure 3: CCTV still showing vapour release from 9S p/v valve Vapour starting to release Figure 4: CCTV still showing tank rupture and vapour release Vapour explosion from ruptured tank Figure 5: CCTV still showing vapour ignition Ignition of the released styrene monomer vapour Vapour release Vapour explosion from tank 9S
9 Figure 6: Fireball at Ulsan bridge Image courtesy of @803_Gorani (Twitter) Fireball very close to the road bridge above the quay Stolt Stolt was informed of the explosions and fire on board Stolt Groenland by a marine compliance officer (MCO) who was on board Stolt Voyager, and immediately activated its Emergency Response Team (ERT) in the Netherlands. The ERT communicated with its MCO via telephone and ‘WhatsApp messenger’ and established that Stolt Groenland’s crew were safe. At 1528, the ERT were informed of a further explosion toward the tanker’s accommodation. However, at 1612, it received a report that the fire had dampened down and that no flames were visible. Shortly afterwards, the fire was reported to have been extinguished, although there was still smoke in the accommodation. Stolt’s protection and indemnity insurers, Gard, appointed the Netherlands based salvors Ardent, to assist Stolt’s emergency response team. It also e-mailed its fleet to check styrene monomer cargoes that were being carried. This was later backed up by fleet Flash Report no.2019/08 highlighting the precautions required when styrene monomer is carried. Local emergency services Local fire brigade shore appliances arrived at YMP3 at 1101 and started to fight the fire. Korea Coast Guard fire-fighting tugs and launches assisted and towed Bow Dalian to a berth clear of Yeompo. A total of 726 emergency responders participated in the firefighting and rescue operations, with 117 fire-fighting appliances being deployed to the scene. A total of two ships’ crew and 15 emergency responders suffered injuries and were taken to hospital for observation or treatment.
10 1.3 ENVIRONMENTAL CONDITIONS During the cargo loading in Texas and during passage in the Caribbean, the average air and sea temperatures experienced by Stolt Groenland were about 30°C, peaking at 37°C air temperature during the day. These averages reduced to about 25ºC during the passage across the Pacific Ocean. In Kobe, the sea temperature was 26ºC and the maximum and minimum air temperatures were 30ºC and 28ºC. In Ulsan, the sea temperature was 24ºC with maximum and minimum air temperatures of 25ºC and 19ºC. 1.4 ON-SITE INVESTIGATION On 28 September, the Maritime Authority of the Cayman Islands requested the MAIB investigate this accident in accordance with the International Maritime Organization (IMO) Casualty Investigation Code (IMO Resolution MSC 255(84)). During the on-site investigation in Ulsan, the MAIB was assisted by the Korea Maritime Safety Tribunal (KMST). Access to Stolt Groenland was controlled by the Korea Coast Guard and restricted by the toxicity of the atmosphere on board. On 3 October, with the co-operation of Bow Dalian’s owners and the Transport Safety Investigation Bureau of Singapore, MAIB inspectors and KMST staff visited Bow Dalian in Ulsan. The tanker’s weather decks and accommodation block were spattered with burned residues (Figure 7). A sample of residue (Figure 8), and the overalls (Figure 9) from a crewman who had been on deck during the period of vapour release from 9S’s p/v valve, were removed for analysis (see Section 1.20). On 7 October, the analysis of samples of styrene monomer taken from Stolt Groenland’s cargo tanks 6C and 6P indicated that the concentrations of the inhibitor 4-tert-Butylcatechol (TBC) were 8 parts per million (ppm) and 7ppm respectively. The following day, MAIB inspectors were allowed access to the vessel. However, the presence of hazardous chemicals and fire damage limited the inspection to the main deck primarily. A further inspection on 12 November was co-ordinated by the Korea Coast Guard and the KMST. These inspections, and inspections conducted by or on behalf of Stolt, confirmed that the heating coils in 9C and 9S were closed and blanked (Figure 10), and that vapours released from the p/v valves for 9S and 9C had ignited. 1.5 DAMAGE A large hole was found in Stolt Groenland’s main deck in way of cargo tank 9S and its common bulkhead with cargo tank 9C (Figures 11 and 12). The access hatch cover to 9S had also been blown off (Figure 13). The manifold area was fire damaged to varying degrees, and the midships deckhouse was burned out (Figure 14). The tanker’s accommodation block sustained extensive internal fire damage (Figure 15). The deck between the technical room and the CCR had collapsed, and both spaces were burned out. Heat and smoke had also penetrated the bridge and damaged much of its equipment. Other than broken windows, many of which were broken by firefighters during the emergency response, external damage to the front of the accommodation block was minimal (Figure 16).
11 1.6 ONBOARD RECORDS Cargo-related records and voyage related records such as ‘noon reports’ were available on ‘Veslink’, a networked system that was used on board Stolt Groenland to store data and to communicate with interested parties ashore. In addition to mandated information, Stolt Groenland’s voyage data recorder (VDR) recorded cargo tank levels, volumes, temperatures, and liquid densities. All cargo-related records (digital and paper) that were held in the CCR and the cargo samples stored in the midships deckhouse were destroyed in the fire. However, the cargo temperature data from 0001 (UTC) on 30 August to 0150 (UTC) on 28 September (Figure 17), the time range of the data that was available, was recovered from the VDR. Figure 7: Bow Dallian main deck with burned styrene depositsMain deck spattered with burned residues Figure 8: Styrene residue sample Close-up of styrene residue sample to scale at approximately 90cm across Figure 9: Overalls from Bow Dallian crewmanBlackened overalls of crewman on deck during period of vapour release
12 1.7 STYRENE MONOMER 1.7.1 Description Styrene monomer (also known as ethenylbenzene, phenylethylene, phenylethene, vinylbenzene, or cinnamene) is an aromatic hydrocarbon and a building block of the plastics industry. It is commonly used in the manufacture of a variety of plastic, rubber and polystyrene products. Over 30 million tonnes of styrene are produced annually, much of it transported by sea to plastics production plants. Styrene monomer is a colourless, transparent liquid under ambient conditions and has a distinctly sweet odour. It is a volatile and flammable substance with a flashpoint of 32ºC. Its boiling point is 145ºC and its auto ignition temperature is 490ºC. The harmful effects of styrene monomer include severe irritation to eyes and mucous membranes, as well as gastrointestinal effects. Chronic exposure to styrene monomer leads to central nervous system dysfunction, such as headache, fatigue, weakness, depression, hearing loss and nerve damage. Figure 10: 9S heating control valves9S heating control valves in which coils were closed and blanked
13 Figure 11: Aerial view of main deck and location of 9S Stolt Groenland’s main deck showing cargo tanks 9S and 9C and the approximate area of tank split 9C cargo tank area Approximate area of tank split (at deck level) 9S cargo tank area
14 Figure 12: 9S tank rupturePolymerised styrene in ruptured tank Figure 13: 9S access hatchAccess cover to 9S blown off Polymerised styrene
15 Figure 14: Midships deckhouse Midships deckhouse burned out Figure 15: Accommodation interiorExtensive internal fire damage to accommodation interior
16 Figure 16: Accommodation frontMinimal damage to accommodation exterior 1.7.2 Polymerisation Polymerisation is a chemical reaction, or process in which a monomer or a mixture of monomers is converted into a polymer such as polystyrene. Styrene polymerises slowly at normal ambient temperatures but very rapidly at elevated temperatures. It can be accelerated by heat, the lack of dissolved oxygen, the lack of a polymerisation inhibitor, and when contaminated by oxidising agents and most halides. The polymerisation process is exothermic and, if the resulting heat is not removed, the bulk styrene temperature may rise to a level at which polymerisation is self-sustaining and very rapid. This is referred to as ‘runaway polymerisation’ and will usually be initiated by temperatures above 65°C. During a runaway polymerisation, the cargo will expand causing pressure to increase to the point that vapour is released from tank vents or p/v valves. In some cases, the resulting build-up of pressure is sufficient to rupture the tank. 1.7.3 Polymerisation inhibitors To prevent polymerisation during storage and transportation, an inhibitor must be added. TBC, the most commonly used polymerisation inhibitor, is a solid but is often mixed with methanol to produce a liquid before adding to styrene monomer. In shore storage facilities, TBC is added to styrene monomer through dosing systems. For the marine transportation of styrene monomer in bulk, the TBC is added to the bottom of a cargo tank before loading. TBC should be stored in non-reactive, light resistant containers at ambient temperature. It is not known to have a limited shelf life.
17 Figure 17: Cargo temperatures recorded on the VDR Line gra ph s hows tan k te mper ature s b et wee n 1 6 and 27 S ept emb er (U TC) , hea tin g coi l v al ves op en ed and r ise of s tyr ene m ono mer t emp era tu re ove r 3 d ays 30.0 40.0 50.0 60.0 70.0 Stolt Groenland cargo tank temperatures Temperature ºC 9S styrene monomer temp 65° Heating applied Kobe, Japan Ulsan OTK YMP 30 August September 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Heated HMD cargo in tanks 8P, 9P, 10P and 11P Heated cargo in 7S 6P-16 6C-17 6S-18 7P-19 7C-20 7S-21 8P-22 8C-23 8S-24 9P-25 9C-26 9S-27 10P-28 10C-29 10S-30 11P-31 11C-32 11C-32 9S - styrene monomer >1°C temp rise each day
18 The TBC level must be maintained within a specified concentration range, typically between 10-15ppm, to prevent polymer formation. The presence of dissolved oxygen is required for the inhibitor to function properly and it is the inhibitor that controls oxygen depletion. Where ambient temperatures are likely to exceed the flash point of the cargo, it might be desirable to use a nitrogen blanket to minimize the risk of fire or explosion. However, the atmosphere above styrene monomer should contain 3% to 8% (volume) of oxygen to maintain inhibitor effectiveness and therefore avoid polymerisation. Whether stored under air or a nitrogen blanket, the inhibitor concentration is depleted more rapidly at elevated temperatures. Consequently, styrene monomer is usually kept below 30°C when transported and below 20°C in storage tanks ashore. 1.8 CARGO SYSTEM Stolt Groenland was built in 2009 and was one of six sister vessels. The tanker had 39 integral cargo tanks of varying capacities, which were separated into three fore to aft sections by two transverse cofferdams. The tanks in the fore and aft sections (tanks 1-3 and 12-13) were constructed of zinc coated mild steel; the mid-section (tanks 4-11) was of solid duplex stainless steel construction. The tanks’ bulkheads were corrugated. All stainless steel tanks were fitted with heating coils, capable of maintaining a temperature of up to 85°C. The heating medium was water, and the system was controlled manually via valves on deck. Each cargo tank was independent and had its own pump and pipeline arrangement. The tanks were protected against over and under pressures by individual p/v relief valves, which were situated at two vent stacks on the main deck. The lifting pressure of the p/v valves was 206mb. Tank liquid levels were measured by a closed radar system, and tank pressures and temperatures by internal sensors. The temperature sensors were located at low and middle levels in each tank. Data from the radar and tank sensors was monitored via an Ariston computerised cargo monitoring system in the CCR (with a slave display on the bridge). The data was also fed to the vessel’s CargoMax stability computer. The information displayed by the Ariston system on the cargo monitor screens was determined by user preference. The system could be configured to show individual tanks or groups of tanks. The user was also able to set cargo level, temperature and pressure alarms for each tank. Stolt Groenland’s crew could not test or monitor for TBC concentration, oxygen or polymer levels in the styrene monomer cargoes. These values could only be determined in shore laboratories. 1.9 LOADING IN HOUSTON 1.9.1 Planning and documentation The cargo stowage plan for the loading between 2 and 17 August was first sent to Stolt Groenland by the tanker’s shore-based ship operator (see Section 1.11) on 19 July. Inconsistencies between the voyage cargo report (VCR) and the vessel’s iStow Tanker (iStow) cargo stowage computer, were raised by the C/O. These were subsequently addressed by the ship operator, and the plan was re-issued. Following further iterations of the plan, during which the intended stowage of the styrene monomer cargo was amended from cargo tanks 6P, 6C, and 10S, to 6P, 6C and 9S,
19 a final iStow file and VCR was issued by the ship operator on 1 August. The plan was checked and agreed by Stolt Groenland’s C/O and approved by the tanker’s master. The VCR listed the nominated cargoes for the forthcoming voyage. It also cross- referenced the bill of lading number with the chemical name, quantity, ports of loading and discharge, cargo-handling requirements, and safety references. It included: 430 STYRENE MONOMER Generic specs: HANDLING UPDATED 10 JUL 18 FOR SHELL REVISION 9 DATED 01 APR 18 HEAT ADJ NO HEATED CARGO TO BE STOWED ADJACENT. IMO Ships carrying this product must be provided a Certificate of Protection (Inhibitor Certifcate) from the shipper in order to comply with the requirements of 15.13.3. 1) Name and amount of additive/inhibitor 2) If additive is Oxygen dependent 3) Date additive was added to cargo and duration of effectiveness 4) Temperature limitations affecting effective lifetime of additive 5) Action that needs to be taken should voyage exceed effective lifetime of additive or a statement concerning the Oxygen level required if the exclusion of air method is being used to stop oxidization as per 15.13.4. If an Inhibitor Certificate is to be issued it MUST state if the Inhibitor is Oxygen Dependent, or not, and if it is Oxygen Dependent it MUST state the Oxygen level which will allow the inhibitor to be effective. If you do not receive this documentation please alert your Ship Operator as soon as possible. IBC Code 15.19.6 High Level alarm in cargo tank IBC Code 16.6.1 NO ADJACENT HEAT as this cargo can potentially go into a state of POLYMERIZATION, DECOMPOSITION. THERMAL INSTABILITY OR EVOLUTION OF GAS IBC Code 16.6.2 HEATING COILS IN TANK(S) loading this cargo MUST BE BLANKED OFF IMO Name STYRENE MONOMER INCOMPAT Polymerization catalysts. Strong oxidizing agents. The Shell document referred to in the VCR was their Cargo Handling Sheet for styrene monomer, which was intended for use by vessels chartered by Shell Chemicals. It included: Loading Temperature Range: 13 – 23 °C / 55 – 73 °F Transit Temperature Range: Ambient Discharge Temperature Range: Ambient
20 Maximum Heating Coil Temperature: Blanked Off Adjacent Maximum Cargo Temperature: 35°C Note 1: This product is heat sensitive, self-reactive and inhibited. Note 2: Shell Chemical SM is generally inhibited with Para-tertiary Butyl Catechol (p-TBC), typically at 10-20 ppm or more, depending on duration of voyage. Where required to add additional inhibitor to a loaded tank of styrene, this should be done using closed equipment. If the equipment is not available and there is a requirement to add inhibitor, the local Chemical MTA should be consulted. DAILY LOG: During the voyage the vessel shall maintain a daily log of the following and, upon request, send the log to the responsible Shell Chemicals Charterer: 1. cargo (Styrene) temperature 2. adjacent cargo temperature 3. air and sea water temperature If during the voyage any of the following is observed, the responsible Shell Chemicals Charterer shall be notified immediately: ●1 °C rise of cargo (styrene) temp per day, over 3 consecutive days ●> 2 °C rise of cargo (styrene) temperature within any 24 hours ●Cargo temperature at any time raises above > 30°C ●O2 content in cargo (styrene) tank ≤4% by volume, when inerted After completion of cargo (Styrene) discharge the vessel shall provide a copy of the daily log of temperature/pressure/O2 content to the responsible Shell Chemicals Charterer. Due to risk of polymerization, Styrene should not be carried in tanks serviced by a cargo pump room. 1.9.2 The cargo The styrene monomer carried on board Stolt Groenland was supplied by Ineos Styrolution America LLC to the LBC Terminal in Houston, USA. The cargo was pumped from shore tank B503 (ST B503) to the tanker during 7 and 8 August 2019 and was designated as cargo OBL430. The charterer on the Bill of Lading was Samsung C&T Corporation. Prior to loading, the cargo tanks 6P, 6C and 9S had passed wall wash tests and visual inspections conducted by a cargo surveyor from American Cargo Assurance (ACA), and a preloading acceptance certificate was issued.
21 During the afternoon of 7 August, the ACA cargo surveyor and Stolt Groenland’s C/O completed a preloading checklist and exchanged cargo documentation which included a safety data sheet (SDS) for styrene monomer (stabilised) issued by Ineos Styrolution. Shortly afterwards, the surveyor carried out a final visual check of 6P, 6C, and 9S and then poured 3 US gallons (11.4 litres) of liquid inhibitor TBC into each of the tanks through their respective cleaning hatches. The addition of the inhibitor was witnessed by a terminal representative. No inhibitor was provided to the tanker’s crew to carry on board during the voyage. The loading of the styrene monomer started at 1735 (UTC-5) on 7 August from one shore cargo hose. The hose was connected to the tanker’s manifold via a splitter spool piece connected to tanks 6P and 6C. A cross-connection on the manifold also enabled the simultaneous loading of cargo tank 9S. The temperature of the styrene monomer stored in ST B503 was 13ºC. Between 0146 and 0340 on 8 August, pumping was stopped while awaiting the results of the shoreside testing of styrene samples from the cargo tanks. The analysis did not identify any issues, and loading was completed by 1520. The observed temperatures of the styrene monomer in Stolt Groenland’s cargo tanks shortly after the loading was completed ranged between 16.7 and 17.2ºC. At 1550, the ACA surveyor sealed the access and cleaning hatches for cargo tanks 6P, 6C and 9S. He then issued a Certificate of Inhibitor (Figure 18), which was signed by the attending terminal representative and Stolt Groenland’s C/O. This stated that the ideal temperature for the cargo was 60-85ºF (15.5-29.4ºC) and that if these conditions were exceeded, the cargo should be monitored for the inhibitor level and polymerisation, adding additional inhibitor as needed. 1.9.3 Styrene and inhibitor mixing The TBC liquid added to the tanks before cargo loading was thick and viscous, and its mixing with the styrene monomer relied on the agitation achieved during the loading process and the sloshing caused by vessel movement on passage. The partial agitation caused by the flow of the styrene monomer cargo as it loads into the tank was not sufficient to adequately mix the TBC with the styrene cargo. For this reason, TBC concentration tests, done both during and immediately after loading were prone to inaccuracy, and were therefore not undertaken. Instead, calculations were conducted and the notation ‘adjusted to XX ppm’ was used in the shipment analysis reports. This process was standard industry practice for styrene bulk transportation by sea. 1.9.4 Styrene sampling During the loading of the styrene monomer, the ACA surveyor took 1 US pint (0.47 litre) samples of the cargo on opening ST B503 from the dock-line, the cargo manifold and the 6P, 6C, and 9S pump stacks. The surveyor also took samples from each tank at the first foot1 and the final levels. The surveyor passed the samples to the C/O and these were then stored in the midships deck housing. The surveyor also sent a sample from ST B503, and cargo tank samples to an Ineos laboratory ashore for testing. The samples from 6P, 6C and 9S were combined for both the first foot and final levels, and were tested as composite samples. 1 The ‘first-foot’, or about 30cm, of loaded cargo was sampled to check if the cargo pipeline system was clean.
22 Figure 18: Certificate of InhibitorCertificate of inhibitor issued by ACA surveyor which was signed by attending terminal representative and Stolt Groenland’s C/O
23 The Styrene Shipment Analysis report concerning the composite final sample (Figure 19) stated that the TBC concentration was adjusted to 17ppm and the Certificate of Inhibitor stated that the ‘Days Effective’ was 60-90 days. The concentration level was a calculation based on the TBC concentration in ST B503 (11.3ppm) and the amount of inhibitor that was added into the tanks prior to loading. 1.10 CARGO TEMPERATURE CHANGES DURING THE VOYAGE Stolt Groenland’s styrene monomer cargo was due to be discharged in An-Ping, Taiwan about 56 days after it was loaded in Houston. The VDR provided hourly cargo temperature records for the 30-day period prior to the explosion (Figure 17). At 1200 (UTC) on 30 August the recorded temperatures of the styrene monomer in 6P, 6C and 9S were 31.5, 31.4 and 37.2°C respectively. The temperatures of the HMD in 9P and the adiponitrile in 9C were 51.5 and 43.9°C respectively. The temperature variations recorded in cargo tanks 8P, 9P, 10P and 11P showed that the HMD had been routinely heated to about 55°C and then allowed to drop to about 45°C. This was achieved by opening and closing the heating coil valves; it typically took about 2 days to heat the HMD and 5 days to for its temp to drop. This weekly heating cycle resulted in temperature variations of about 2.5°C in 9C and 0.5°C in 9S. On 18 September, the heating coil valves for 8P, 9P, 10P and 11P were opened and the temperature was increased to about 55°C, where it was maintained ahead of the planned cargo discharge programme. At 1200 (UTC) on 18 September, the temperatures of the cargoes in 8S, 9S, 10S and 11S were 37, 37.7, 37.8 and 36.1°C respectively. The subsequent daily 1200 (UTC) temperatures of the starboard tanks are shown in Table 3. Table 3: Midday temperatures for tanks 8S, 9S, 10S and 11S between 19 and 27 September 2019 Dates 8S midday temperature (°C) 9S midday temperature (°C) 10S midday temperature (°C) 11S midday temperature (°C) 19 Sept 37.3 37.6 37.8 36.2 20 Sept 37.7 37.9 37.7 36.2 21 Sept 37.9 38.4 37.9 36.2 22 Sept 38.5 39.4 38.1 36.5 23 Sept 39.4 41.8 38.6 36.7 24 Sept 40.1 44.9 39.3 36.8 25 Sept 46.0 48.9 40.1 36.9 26 Sept 43.4 54.5 40.7 37.4 27 Sept 44.9 66.7 41.6 38.7 The temperature of the styrene monomer in 9S rose by 1°C on three consecutive days between 21 and 24 September and rose by 2.4°C between 22 and 23 September. It reached 65°C at about 1000 (UTC) on 27 September and 100.8°C immediately before the explosion.
24 Figure 19: Final sample analysis results
25 1.11 CREW 1.11.1 General Stolt Groenland’s crew comprised 10 officers and 15 ratings. The officers were Russian nationals and the ratings Filipino nationals. All crew held the appropriate STCW2 certification, including the chemical tanker basic training endorsement. The length of contract for the officers was 4 months. Two of the ratings were pumpmen, whose duties primarily concerned cargo operations. The master, senior officers and deck officers also had completed the STCW chemical tanker advanced training (see Section 1.15.2) within the last 5 years in accordance with Regulations V/1-1 and V/1 – 2. They viewed styrene monomer as a comparatively benign cargo when inhibited, and none had previously experienced problems with its carriage. 1.11.2 Master Stolt Groenland’s master had worked for Stolt since 1999, serving on a variety of ships. He had been a C/O for 5½ years and was promoted to master in 2009. Since 2016, he had been Stolt Groenland’s regular master, and prior to that he had served on its sister ships. The master last joined Stolt Groenland on 14 August 2019. 1.11.3 Chief officer (Ulsan) The C/O that joined the vessel in Ulsan started his career with Stolt in 2008 and had remained with the company throughout. He was promoted to second officer (2/O) in 2011, and to C/O in 2016. It was his fifth contract on Stolt Groenland, and he had also served on the vessel’s sister ships. 1.11.4 Chief officer (loading and voyage) The C/O that oversaw the cargo loading operation and completed the passage to Ulsan started his sea career as cadet in 2006 and worked on board oil tankers before joining Stolt as a 3/O in 2011. He was promoted to 2/O in 2012 and to C/O in
- The C/O had served as C/O on Stolt Groenland three times, usually with the
same master and crew. He last joined the tanker in June 2019. 1.11.5 Voyage routines On passage, Stolt Groenland’s crew carried out watchkeeping duties and routine maintenance. The C/O worked days, supervising the deck crew and the pumpmen as well as completing administrative tasks and inspections. The C/O was responsible for monitoring the cargo and ensuring that the heated cargoes remained within the temperature ranges specified on the VCR. The adjustment of the heating controls to keep the heated cargoes within these parameters was delegated to one of the pumpmen. The second pumpman assisted with monitoring and maintaining pressures in the cargo tanks that had been protected with a nitrogen blanket. 2 International Convention on Standards of Training, Certification and Watchkeeping for Seafarers 1978, as amended (STCW Convention)
26 1.12 CARGO MANAGEMENT ASHORE Stolt was the world’s largest operator of chemical tankers, with a fleet of over 100 vessels. Cargo operations were co-ordinated from its main operations centres in Rotterdam, Houston and Singapore, and each vessel had a nominated ship operator who was responsible for cargo allocation and cargo loading and discharge programmes. The ship operator was the master’s shore-based point of contact for cargo-related issues. Stolt Groenland’s ship operator was based in Houston and was typically responsible for between four and five tankers at any one time. The ship operator had 23 years’ experience in the shipping industry and had worked for Stolt as a ship operator for 4 years, having initially completed 6 months’ on the job training under the supervision of an experienced manager. The ship operator used the iSTOW software, supported by Stolt’s ‘Chemscan’ database, to plan cargo stows. The database contained details of each chemical cargo, including temperature and nitrogen requirements, and enabled the iSTOW programme to identify inconsistencies in stowage plans related to aspects such as heated and cooled cargoes, heat in adjacent tanks, and cargo quality requirements. As a result, the iSTOW software informed the ship operator of the mix of cargoes a ship was able to carry. The user guide for iSTOW described the system as: …a computerized system that assists ship operators in the cargo stowing process. The system provides a “click, drag, and drop” feature for assigning of cargoes from a list to a cargo tank. STOW makes no attempt to stow the ship for the ship operator. Instead, it is a tool to assist the ship operator in the stow process and to alert them when any rules or regulations are violated. The system records stow changes made by the ship operator, sends and prints stow plans (including versions for last three cargoes and tank condition). Once the Stow Plan has been completed, the ship operator can ask the system to perform checks of the current Stow Plan. These checks use a combination of information from the Stolt CHEMSCAN Database and IMOS3. For example, if one of our customers has requested that we carry their cargo in a stainless-steel tank and that the adjacent cargoes are not heated above a certain temperature, the system will detect if there is a potential problem and alert the ship operator. Other checks are US Coast Guard compatibility, commingling, and last cargo restrictions. Additional checks are scheduled to be developed in compliance with changes in rules and regulations. On completion of verifying an intended cargo stowage plan in iSTOW, the ship operator forwarded the iSTOW file and the VCR to the vessel to check the viability of the stowage plan regarding factors including cargo compatibility, stability and trim. Stolt Groenland’s ship operator was aware of the potential for styrene monomer to polymerise and understood that the chemical should not be stowed adjacent to a heated tank. The ship operator assessed that the stowage of styrene monomer in 9S and the stowage of heated cargoes in 9P and 7S (i.e. separated by 9C and 8S) was acceptable. 3 Ship voyage management software.
27 1.13 ONBOARD CARGO PROCEDURES 1.13.1 Planning and stowage Stolt Groenland’s safety management system (SMS) included a cargo and ballast operations manual that provided guidance on the various phases of cargo operations. The standard operating procedures section of the manual included: Ship Operator stowage proposals as described in Cargo Orders Communication procedure are presented as proposals and must be closely studied taking into consideration the port and load berth rotation, draft, list, trim, loading sequence, etc. While operations try to give the Master maximum flexibility in making alterations, the Master and Chief Officer will often find that because of heating requirements, coating compatibility, tank sizes, pumps and cargo specifications, last cargo and customer requirements, there is often a limited choice of stowage. …It is the ship’s responsibility to make a detailed check of proper cargo stowage based on the proposal received from the Ship Operator. .. The final stow is always subject to the Master’s approval. No issues with the stowage of the styrene monomer cargo carried on board Stolt Groenland were raised by the tanker’s master or C/O. 1.13.2 Cargo monitoring The cargo and ballast operations manual also included: Care for the Customers cargo does not cease after loading, it continues throughout the voyage to the discharge port and during the discharge. Some cargoes may require additional attention and control during the voyage in respect to their single or combined concerns to: safety, quality, handling, cleaning, costumer’s demand etc. Ongoing cargo care is the most important aspect of the chemical tanker trade and the Chief Officer has the primary responsibility for conducting and recording these tasks… Voyage instructions required that the temperatures of cargoes requiring heating or cooling be recorded in a cargo temperature log at least once a day and for the log to be available for scrutiny by the receivers of the cargo at discharge ports. The instructions also required the temperatures of non-heated and non-cooled cargoes to be monitored for signs of abnormal activity such as polymerisation. There was no specific requirement for the temperatures of non-heated and non-cooled cargoes to be recorded. 1.14 IBC CODE SOLAS4 Chapter VII and MARPOL5 Annex II require chemical tankers built after 1 July 1986 to comply with the International Code for the construction and equipment of ships carrying dangerous chemicals in bulk and index of dangerous chemicals 4 International Convention for the Safety of Life at Sea, 1974, as amended. 5 International Convention for the Prevention of Pollution from Ships, 1973, as amended.
28 carried in bulk (IBC Code). In addition to prescribing design and construction standards, The IBC Code tabulates the minimum requirements for over 750 dangerous chemicals. References in the IBC Code to cargo temperature, inhibited cargoes, and cargoes not to be exposed to excessive heat, include: Chapter 7 – Cargo temperature control 7.1.5 Means shall be provided for measuring the cargo temperature. 7.1.5.4 When overheating or overcooling could result in a dangerous condition, an alarm system which monitors the cargo temperature shall be provided. (see also Operational Requirements in 16.6.) Chapter 15 – Special requirements 15.13 Cargoes protected by additives 15.13.3 Care shall be taken to ensure that these cargoes are sufficiently protected to prevent deleterious chemical change at all times during the voyage. Ships carrying such cargoes shall be provided with a certificate of protection from the manufacturer, and kept during the voyage, specifying:
- the name and amount of additive present;
- whether the additive is oxygen dependent;
- date additive was put in the product and the duration of
effectiveness;
- any temperature limitations qualifying the additives effective
lifetime; and
- the action to be taken should the length of the voyage
exceed the effective lifetime of the additives. Chapter 16 – Operational requirements 16.6 Cargoes not to be exposed to excessive heat 16.6.1 Where the possibility exists of a dangerous reaction of a cargo, such as polymerization, decomposition, thermal instability or evolution of gas, resulting from local overheating of the cargo in either the tank or associated pipelines, such cargo shall be loaded and carried adequately segregated from other products whose temperature is sufficiently high to initiate a reaction of cargo (see 7.1.5.4). 16.6.2 Heating coils in tanks carrying this product shall be blanked off or secured by equivalent means.
29 1.15 SHIPPING INDUSTRY GUIDANCE 1.15.1 Tanker Safety Guide The Tanker Safety Guide (2014) (TSG), was published by the International Chamber of Shipping to promulgate good practice. With reference to styrene monomer, the guide stated that polymerisation was very often initiated by elevated temperatures, which could reduce the effectiveness of the inhibitor or reduce the inhibitor’s effective life. It also stated: These inhibitors are designed to be effective for a set period of time at a specified temperature. It is therefore essential that the timed effectiveness of the inhibitor is sufficient for the voyage and includes a good safety margin. Since elevated temperature can reduce the effectiveness of the inhibitor, or reduce its effective life, it is essential that heat sources are kept away from these cargoes and that the temperature is closely monitored on at least a daily basis, or more frequently if recommended by the cargo manufacturer. An increase in cargo temperature that is not related to ambient weather conditions or adjacent cargo temperatures may be an early indication that a polymerisation process has started. In such instances, the cargo manufacturers should be contacted immediately to advise appropriate counter measures which may include the addition of more inhibitor or the cooling of adjacent structures. Should the increase in temperature be rapid then the decision to jettison cargo may be the only option in order to avoid serious structural damage to the cargo tank and the ship. Regarding cargo stowage and handling, the TSG included: ●That heated cargoes will be stowed so as to be compatible with cargoes in adjacent tanks; ●That heated cargoes will be stowed so as not to be adjacent to heat sensitive cargoes or when a heat source could lead to a dangerous reaction; ●Some cargoes require an inhibitor to ensure that they remain chemically stable during transit. Such cargoes should not be stowed adjacent to heated cargoes; ●Some cargoes are liable to self react under certain conditions…The temperature of cargoes that may self-react should be closely monitored. Unexpected changes are an early indicator of a possible self-reaction. Should the temperature rise be in excess of what is expected, taking into account the ambient conditions and the temperature of adjacent cargoes, then this should be treated as an emergency and handled accordingly… 1.15.2 Chemical Distribution Institute Guidance The Chemical Tanker Operations for the STCW Advanced Training Course – A Practical Guide to Chemical Tanker Operations (2018) was produced by the Chemical Distribution Institute (CDI) to provide an aide-mémoire for crews and a study guide for advanced training in chemical operations.
30 Regarding the polymerisation and inhibited cargoes, among other things, the guide stated: Heat can initiate polymerization in reactive monomers, producing yet more heat in an exothermic reaction. Inhibited self reactive cargoes: should not be loaded adjacent to heated cargoes and heating systems will require isolating. 1.16 STORAGE AND HANDLING GUIDANCE 1.16.1 Styrene Monomer: Safe Handling Guide (2018) The Plastics Europe Styrene Monomer: Safe Handling Guide (2018)6 (the Guide) was produced by the Styrene Producers Association, members of which included Ineos Styrolution Europe GmbH and Shell Chemicals Europe BV. Ineos Styrolution provided copies of the safe handling guide to all its customers. The Guide was not referenced in Stolt’s VCR, nor was it passed to Stolt Groenland. The Guide referred to transportation of styrene monomer by road, rail, barge and sea. It included: Heated adjacent cargoes should be avoided, even if separated by cofferdams. Styrene should not be loaded into cargo tanks adjacent or corner-to-corner to a cargo having a temperature of 30°C (86°F) or higher even if separated by a cofferdam. Heating styrene to above this temperature will reduce shelf life and increase the risk of polymerisation in the cargo tank. For styrene storage ashore, Appendix 2 of the Guide included the following checks for polymerisation: ●Polymer content (< 10 ppm, depending on product spec.) ●Temperature (<< 2-3°C/day). If the temperature rises 1°C/day, it is advised to be alert and keep monitoring the temperature actively. Re-circulation could stop the temperature rise. A 2-3°C/day temperature increase is a typical indication of the onset of a runaway polymerization. The temperature needs to be monitored continuously. ●TBC levels (target >10 ppm wt). At temperatures below 15°C in the tank/ container, weekly sampling should be sufficient; above 25°C daily sampling is recommended. Normal TBC levels are between 10 and 15 ppm (for some applications higher concentrations are required). Below 10 ppm TBC polymer levels can slowly increase; below 4 ppm the TBC is not effective and accelerated polymerization will occur. ●Oxygen levels (3-8 volume % in the vapour phase). 6 Plastics Europe is a Pan-European trade association representing plastics manufacturers, of which the Styrene Producers Association was a sector group.
31 It explained that in certain circumstances it is possible for a runaway reaction to occur even if there is TBC and oxygen present in the styrene. These included: the presence of contaminants; the presence of rust in the tank; high (local) temperatures (>40°C); and non-homogeneous distribution of the TBC and oxygen in the tank contents. The guide also explained that TBC is not active long enough at high temperatures, since the reaction rate and therefore the depletion rate becomes too high. It included indicative depletion rates for TBC at varying temperatures (Table 4). Table 4: TBC depletion in styrene (if stored under air) Temperature Depletion Days/1ppm TBC Content TBC Content Shelf Life °C [Initial ppm] [end] Assured days 25 11 15 10 55 30 7 15 10 35 40 1.5 15 10 7 1.16.2 Safe handling sheets In addition to the Shell Chemicals Cargo Handling Sheet for styrene monomer that was referenced in Stolt Groenland’s VCR (see Section 1.9.1), similar guidance was provided by other styrene producers. Requirements for TBC concentrations and styrene temperatures contained in these guides are summarised in Table 5. Table 5: Comparison of manufacturers’ requirements for styrene monomer Producer Recommended TBC for storage Storage or carriage temperature Maximum temperature Remarks Americas Styrenics 10-15ppm Ambient None quoted Cooling recommended for storage where temperatures exceed 24ºC. Vessels containing styrene should be protected from external sources of heat. Shell Europe 10-20ppm Ambient 30ºC Not adjacent to heat. Adjacent maximum temp 35ºC. Lyondellbasell 10-15ppm Ambient 30ºC Styrene monomer should not be stored adjacent to tanks or compartments that are heated. Chevron Phillips 10ppm 24ºC 30ºC Stowed with respect to compatibility, heat adjacency and other requirements.
32 1.16.3 Safety data sheets SDSs are issued by chemical manufacturers in a harmonised format to provide generic safety information on products. SDSs are not specific to marine transport. The transport information provided in the SDS for styrene monomer (stabilised) issued by Ineos Styrolution did not include guidance regarding the bulk transport of the product by sea. 1.17 RECENT INSPECTIONS, AUDITS AND VETTING On 22 May 2019, Stolt Groenland was audited by a Stolt superintendent. The internal audit report noted that the SMS was well implemented, the senior officers were diligent, and that the tanker was very well maintained. Two non-conformities and 11 observations were recorded. The non-conformities concerned the absence of records of atmospheric checks when tank cleaning, and the recording of working hours. The observations were related to minor errors and omissions in documentation. On 6 July 2019, Stolt Groenland was inspected by a Port State Control officer in Long Beach, USA. No deficiencies were identified. On 6 August 2019, Stolt Groenland was vetted by a CDI inspector in Point Comfort, USA. One of the questions included in the CDI questionnaire was: Are officers aware of the documentation and handling requirements for cargoes and inhibitors, and if the cargo carried is required to be inhibited, is the required information available? No deficiencies were recorded, and the vetting report noted: Due to the various annex II cargoes carried on the vessel, current and previous cargo operations plans were checked and found in compliance with IBC and company procedures. And Observed the cargo handling and monitoring equipment on deck and in the CCR during cargo operations and found in good condition overall. 1.18 YEOMPO QUAY The port of Ulsan was administrated by the authority of the Ministry of Oceans and Fisheries. The berths were managed and operated by three different entities; the Ministry, Ulsan Port Authority and private companies. In the case of Yeompo Quay, berths 1 and 2 were operated and managed by Ulsan Port Authority while berth 3, where the accident occurred, was operated by the Ministry. Several berths and jetties in Ulsan harbour were specified for handling dangerous cargoes, and they were listed in the Ministry’s publication Safety Navigation Guide for Oil Tankers (Ulsan Port). The guide did not list Yeompo Quay as an authorised berth for handling dangerous cargo.
33 Stolt Groenland’s berth at Yeompo Quay had been arranged by the ship’s local agent who was given permission by the port authority to use it for ship-to-ship transfer operations. 1.19 STYRENE MONOMER ACCIDENTS AND INCIDENTS 1.19.1 Stolt Focus During the investigation into the causes and circumstances of the explosion on board Stolt Groenland, MAIB was made aware of a styrene monomer polymerisation incident that occurred on board Stolt Focus a couple of weeks earlier. Styrene loading Between 3 and 4 August 2019, the Cayman Islands registered chemical tanker, Stolt Focus, also operated by Stolt, loaded 4900t of styrene monomer into nine stainless steel cargo tanks at the LBC Terminal, Houston. The styrene was produced by Ineos Styrolutions and the product was loaded from ST B503. The temperature of the styrene monomer in the shore tank was 13.33°C and the TBC concentration was 11.7ppm. The observed temperatures the styrene shortly after it was loaded on board were between 16.6 and 21.5°C. The certificate of inhibitor issued by the attending ACA surveyor stated that 14 US gallons of liquid TBC had been divided between the cargo tanks and that the target TBC concentration was 21ppm. The effective days (60 – 90) and inhibitor statement shown on the certificate were identical to the certificate issued to Stolt Groenland (Figure 18). The certificate was signed by the surveyor and the tanker’s C/O. Passage Stolt Focus departed Houston on 12 August 2019 and arrived in Kobe on 13 September. At about this time elevated temperatures were discovered in some of the tanks containing styrene monomer and actions were taken to cool the cargo and contain the situation. The incident was not reported to the Flag State at the time. On 20 November 2019, Stolt informed the Cayman Islands Registry that Stolt Focus had experienced a problem with the styrene monomer cargo. An email to the Registry included: Stolt Focus observed a steady rise in temperature of the Styrene Monomer onboard, all our efforts to stabilize temperature rise failed, after consultation with our chemists it was decided to mix the Styrene Monomer with sea water to stop the reaction which was successful. As a result, we now have 4 tanks with this mixture which is now unpumpable and therefore we need to reduce viscosity by diluting with Benzine. SOLAS is not so clear on dilution of cargo’s and we would like your guidance to ensure we do correctly and meet all relevant regulations. Our initial plan was to carry out alongside in Malaysia which is now a no go as we are unable to get permission from Malaysian authorities.
34 Stolt proposed to dilute the styrene monomer with Benzine in international waters. The intended ratio facilitated the addition and mixing of the ‘short stop’ inhibitor7 phenothiazine (PTZ), which would stabilise the styrene to enable its incineration ashore. The Cayman Islands Registry approved Stolt’s proposal subject to several conditions concerning: risk assessments, the readiness and functioning of equipment, enhanced monitoring, and the notification of transfer and disposal intentions to coastal states. Request for further information Due to the co-incidence of the heating of styrene monomer cargoes on board Stolt Focus and Stolt Groenland (same supplier, same port of loading, same shore tank, similar timeframe, similar trading route), the MAIB requested Stolt to provide further information on the circumstances leading to the remedial action taken on board Stolt Focus. Stolt refused to do so, as it did not consider the heating and subsequent disposal of the styrene monomer cargo to be a marine accident or marine incident. A note on an emergency response team log sheet recorded during the Stolt Groenland accident stated ‘Same LOADING TERMINAL as S/FOCUS’. 1.19.2 Other maritime accidents In December 2019, the MAIB issued an interim report on the explosion and fire on board Stolt Groenland in which ship owners, ship and terminal operators, and individuals were requested to forward information on accidents or ‘near-misses’ involving the carriage of styrene monomer on board ships. Only one response was received. This concerned one of four tanks of styrene monomer loaded in Houston that was rejected after a high concentration of polymer was identified at the discharge port in China. The temperature of the styrene monomer reached 37°C but was cooled by running water on the deck. In addition, inhibitor was provided by the discharge terminal, and was added in the presence of a P & I surveyor. The polymerisation of the styrene was checked, and the cargo was eventually brought back within specification by a specialist chemical contractor. It was suspected that the polymerisation was caused by oxygen depletion in the styrene monomer. The vent stack from the styrene tank was next to a vent stack from a Hexene cargo that was nitrogen padded. As the nitrogen in the Hexene tank had to be topped-up by bottle through the vent stack, it was possible that the crew used the styrene vent stack in error and inadvertently introduced nitrogen into the styrene tank. Stolt did not report any previous accidents or incidents involving styrene monomer. 1.19.3 Shore-based accidents In the absence of a global chemicals accident database, the accidents resulting from runaway polymerisation of styrene monomer shown in Table 6, have been collated from several sources. 7 A ‘short stop’ is a free radical scavenger that can be added to a polymerising system to temporarily halt the polymerisation. When the short stop is consumed the polymerisation will continue.
35 Table 6: Land-based runaway styrene monomer polymerisation accidents since 1990 Date Location Injuries Fatalities 7 May 2020 Visakhapatnam, India
300
11 30 June 2005 Mesa, USA 0 1 8 April 2004 Jiangsu, China 0 1 2 April 2003 Addyston, USA 0 1 27 March 2000 Pasadena, USA 71 1 6 October 1999 Chiayi, Taiwan 1 0 23 June 1999 Pasadena, USA 21 2 27 June 1998 Channahon, USA 1 0 24 December 1998 Kanagawa, Japan 0 0 21 January 1998 Kaohsiung, Taiwan 4 0 26 January 1996 Chiayi, Taiwan 1 0 5 July 1994 Kaohsiung, Taiwan 0 1 The identified causes of the accidents varied, but insufficient temperature monitoring was a common contributor. 1.20 STYRENE SAMPLE AND OVERALL ANALYSIS RESULTS The sample of residue (Figure 8) and the overalls (Figure 9) recovered from Bow Dalian during the onsite investigation (see Section 1.4) were sent to LPD Lab Services Limited (LPD) for analysis. The laboratory used Fourier Transform Infrared Spectrometry (FTIR)8 and Pyrolysis gas chromatography–mass spectrometry (pyGC-MS)9 analysis to try to identify potential indications of causative factors in the explosion. The LPD report stated that the depletion of TBC is affected by heat, water and air, with heat being the most important. LPD explained that additional inhibitor should be added when inhibitor levels drop below 10 ppm, and that normal levels are 10-15 ppm, but some customers require up to 60 ppm. The laboratory analysis report found that: ●The plastic blob was confirmed as polystyrene or a polystyrene based material. ●There were some indications of the occurrence of dimers and other products of styrene, that would be indicative of an uncontrolled polymerisation process having occurred. 8 FTIR is a sensitive technique particularly for identifying organic chemicals in a whole range of situations including solid, liquid and gas samples. FTIR can also be used to characterise some inorganic compounds. 9 pyGC-MS is a method of chemical analysis in which the sample is heated to decomposition to produce smaller molecules that are separated by gas chromatography and detected using mass spectrometry.
36 ●There is no TBC detectable in the polymer blob material. This is expected and is further indication of uncontrolled polymerisation as it is expected TBC is consumed prior to the ‘runaway’ polymerisation process. ●Styrene was identified on the overalls. This was observed in all areas but appeared more intense in areas of contamination. ●In high contamination areas (contaminated overalls) TBC was identified. ●If it is assumed that the styrene contamination of the overalls took place at the same time of the polymerization reaction and explosion was observed, then it can be stated that inhibitor was present, and detectable. ●Whilst quantification was not undertaken in this investigation, the amount of TBC in the overalls is likely to be significantly above the detection level of trace contaminants (typically between 1-10ppm). Therefore, it is unlikely that the absence of TBC was key in the explosion. LPD found no other clear indication of any initiator compounds associated with the chemical initiation of polymerisation. Based on the results of its analysis, LPD concluded that: At this point in the investigation it is thought that rather than being associated with a lack of TBC, which was clearly present from being found on the overalls, the runaway styrene polymerisation reaction is likely to be associated with insufficient dissolved oxygen during storage, perhaps from poor venting or mixing. So, the TBC was unable to control the rate of polymerisation. The heat removal would then be the driving factor in the polymerisation reaction promoting reaction acceleration or thermal runaway.
37 SECTION 2 – ANALYSIS 2.1 AIM The purpose of the analysis is to determine the contributory causes and circumstances of the accident as a basis for making recommendations to prevent similar accidents occurring in the future. 2.2 EXPLOSION AND FIRE MECHANISMS It was evident, from the exponential temperature gradient for 9S recorded on the VDR (Figure 17), that the explosion and fire on board Stolt Groenland resulted from the runaway polymerisation of the styrene monomer cargo. The sudden release of large quantities of vapour from the 9S p/v valve (Figure 3), the activation of the high-level and high-high-level alarms on the bridge front in quick succession, and the rapid increase in the pressure within 9S that was seen by the C/O and 3/O in the CCR, support this. The runaway polymerisation resulted in the rapid volumetric expansion of the styrene monomer, which increased the pressure within 9S at a rate that exceeded the venting capacity of the tank’s p/v valve. As a result, the tank ruptured through the main deck and the common bulkhead with the empty cargo tank 9C (Figures 11 and 12). The styrene monomer vapour ignited almost immediately following the rupture. As the temperature of the cargo in 9S was well below the auto-ignition point for styrene monomer when the explosion occurred, ignition of the vapour must have been caused by an external source such as sparks created by static electricity or metal to metal contact during tank rupture. 2.3 INITIATION OF POLYMERISATION Styrene monomer polymerisation is initiated by heat, the lack of dissolved oxygen, the lack of an inhibitor, or contact with free-radical initiators such as peroxides. To mitigate against these potential initiators, the styrene monomer carried on board Stolt Groenland had been: ● Loaded under air, which significantly reduced the likelihood of oxygen depletion. ● Inhibited with a quantity of TBC that was intended to remain effective for a minimum of 60 days given the cargo volume and the ambient temperatures anticipated during the voyage. ● Stored in stainless steel tanks that had been wall wash tested and visually inspected, which reduced the risk of contamination. ● Sample tested on completion of loading (Figure 19) and found to be within specification with the peroxide concentration of 6ppm being well below the allowable maximum of 50ppm.
38 ● Stowed in tanks that were not adjacent to tanks10 that contained cargoes that were required to be heated, and for which the heating coils had been blanked. However, despite these precautions, runaway polymerisation occurred. The styrene monomer carried in 9S had been heated to levels well above the ambient temperatures experienced during the voyage. The VDR data (Figure 17) showed that the temperature of the styrene monomer stored in 9S exceeded 37°C during the 29-day period between 30 August and 28 September. The styrene monomer loaded in Houston had been maintained at 13°C in a shore tank; by the end the loading process on 8 August, its temperature had increased by about 4°C. Given that the ambient temperature in Houston was about 30°C and cargoes loaded into the tanks adjacent to 9S all exceeded 30°C, it is likely that the temperature of the styrene monomer would have reached or been higher than the maximum temperature of 29.4°C (85°F) specified on the certificate of inhibitor (Figure 18) when the vessel departed Houston on 17 August, and therefore during the whole voyage. Although unlikely to have been the single cause of the runaway polymerisation event, the elevated temperatures significantly increased the rate of TBC depletion and therefore the risk of polymerisation. It was therefore apparent that the elevated temperature of the cargo in 9S was the key factor in this accident. 2.4 HEAT TRANSFER As the air and sea temperatures in the Houston area, and during the tanker’s passage to and through the Panama Canal, were about 30°C, it was inevitable that the temperature of the styrene monomer and the other ‘ambient’ cargoes would rise accordingly. Any further increase of cargo temperatures required additional heating. The only source for the heating of Stolt Groenland’s ‘ambient’ cargoes was the heated cargoes, particularly the HMD in 8P to 11P, which was 61°C when loaded. The VDR (Figure 17) showed that the HMD temperature was being maintained between 45°C and 55°C by the periodic use of the vessel’s cargo heating system. It also showed that, due to the effects of heat transfer, the temperatures of the cargoes in the adjacent centre tanks (8C to 11C) had settled at between 40ºC to 44ºC, and the corresponding starboard side tanks (8S to 11S) between 36ºC and 38ºC. That the HMD was loaded at such a high temperature and later heated above its specified maximum carriage temperature of 50°C, might not have affected its quality, but it would have exacerbated the levels of heat transfer. The rate and degree of the heat transfer from the HMD cargo to the styrene monomer in 9S would have been influenced by the relatively low specific heat capacity (SHC) of the adiponitrile in 9C and that of the styrene itself (Table 7). SHC is the amount of heat energy required to raise the temperature of a substance per unit of mass. A substance with a low SHC will heat up (and cool down) more readily than a substance with a high SHC. In this case, the adiponitrile and styrene would have readily heated, and avenues for heat loss through adjacent tanks, the empty ballast tanks below, and the sun-exposed deck above were limited. 10 It should be noted that, contrary to guidance contained in the Plastics Europe’s Styrene Monomer: Safe Handling Guide, 6C (which contained styrene monomer) was corner to corner with 7S (which contained a heated cargo).
39 Table 7: The specific heat capacity of various materials at 20ºC Material Specific heat capacity (J/kgK) Water 4200 Glycerol 2400 Acrylonitrile 2090 Styrene 1730 Sodium (liquid) 1230 Adiponitrile 1190 Copper 0.386 2.5 POLYMERISATION INHIBITOR MIXING The TBC concentration was calculated and not measured. It was then poured into the open tanks and the styrene monomer loaded on top of it with no means of mechanical mixing. Poor distribution of the TBC and oxygen in the styrene monomer can lead to low concentrations at certain zones in the tank, which could lead to runaway zones in the bulk contents. The methods of adding and mixing the inhibitor on board Stolt Groenland were rudimentary and relied heavily on vessel and cargo movement during the voyage. Although the styrene monomer was loaded and its inhibitor added 10 days before the vessel departed Houston, these were tried and tested industry practices and, given the levels of TBC found in 6P and 6C after the accident, it is less likely to have been a factor. 2.6 POLYMERISATION INHIBITOR DEPLETION The target TBC concentration on loading was 17ppm. This was based on the amount of TBC required to ensure it remained effective for the duration of the voyage i.e. above 10ppm on arrival. The certificate of inhibitor issued on behalf of American Cargo Assurance indicated that the TBC should have remained effective for a period of 60 to 90 days at a recommended temperature range between 15.6ºC and 29.4ºC (60ºF and 85ºF). The duration between loading the styrene monomer on board Stolt Groenland in Houston and its planned discharge in An-Ping, Taiwan, was 56 days. Using the indicative depletion rates provided by Plastics Europe in its Styrene Monomer: Safe Handling Guide (Table 4): ● At a temperature of 25ºC, the TBC would have depleted at a rate of approximately 1ppm every 11 days. At that rate, it would have taken 77 days for TBC levels to drop from 17ppm to 10ppm (Table 8). ● At a temperature of 30ºC, the TBC would have depleted at a rate of 1ppm every 7 days and therefore could have dropped to 10ppm within 49 days. This was less than the duration the cargo was planned to be carried on board. ● At 37ºC, the TBC depletion rate would have been significantly higher.
40 Table 8: Calculated TBC depletion using figures provided in the Plastics Europe Styrene Monomer: Safe Handling Guide (2018) Ambient Temperature ºC Depletion rate (Days/1ppm) Effective TBC content (17ppm – 10ppm) Assured number of effective days 25ºC 11 7 77 30°C 7 7 49 40ºC 1.5 7 10.5 Tests carried out on the samples taken from 6P and 6C after the accident found the TBC content in each tank to be 8ppm and 7ppm respectively. As the temperature of the styrene monomer in 9s was 5 to 6°C higher than that in 6P and 6C, the depletion rate of its TBC would have been significantly higher and therefore, its concentration level on arrival Ulsan much lower. TBC inhibitor is ineffective below 4ppm and at 40°C this level could be reached within 21 days. The laboratory tests conducted by LPD (Section 1.20) identified traces of TBC on the overalls worn by a crewmember who was working on Bow Dalian’s deck when vapour from 9S cargo tank was venting from its p/v valve. This suggests that TBC was still present in the styrene monomer at the time of the explosion. However, given the prolonged elevated temperature of the cargo in 9S, it is highly likely that the TBC had become ineffective at some point during the voyage and probably before Stolt Groenland arrived at Ulsan. The elevated temperature of the styrene monomer in 9S and the reduced level of TBC, would have increased the likelihood of dissolved oxygen depletion in the styrene monomer and, consequently, increased the rate of polymerisation. As polymerisation is an exothermic reaction, the styrene monomer temperature continued to rise, and on 27 September it reached 65°C (Figure 20), the threshold for runaway polymerisation – the point at which the reaction could no longer be arrested. 2.7 CARGO STOWAGE The IBC Code requires cargoes that present a risk of a dangerous reaction due to localised overheating heating, to be loaded and carried adequately segregated from other products whose temperature is sufficiently high to initiate a reaction of cargo. Reference to this requirement was made in Stolt Groenland’s VCR, which also emphasised that ‘heated cargoes will be stowed so as not to be adjacent to heat sensitive cargoes or when a heat source could lead to a dangerous reaction’. Shell’s cargo handling sheet for styrene monomer stated that the maximum temperature of the cargo in adjacent tanks should not exceed 35°C. Similar guidance was provided by other industry bodies. The Styrene Monomer: Safe Handling Guide went further and stated that ‘styrene should not be loaded into cargo tanks adjacent or corner-to- corner to a cargo having a temperature of 30°C (86°F) or higher even if separated by a cofferdam’.
41 Figure 20: 9S Styrene Monomer Temperature 20-28 September Lin e gra ph sh ows ta nk te mpe ra tur es be twe en 16 an d 2 7 Sep tem be r ( UTC ), he ati ng co il va lve s o pe ned an d ris e o f sty ren e mon ome r tem per at ure ov er 3 day s 30.0 40.0 50.0 60.0 Temperature ºC 70.0 Tank temperatures 16 to 27 September (UTC) 6P-16 6C-17 6S-18 7P-19 7C-20 7S-21 8P-22 8C-23 8S-24 9P-25 9C-26 9S-27 10P-28 10C-29 10S-30 11P-31 11C-32 11C-32 9S – styrene monomer >1°C temp rise each day 65ºC Heating coil valves opened to 7S, 8P, 9P, 10 and 11P 16 17 18 19 20 21 22 23 24 25 26 27 September Kobe, Japan Ulsan OTK YMP
42 Some industry publications focussed on the need to physically segregate heated cargo from heat sensitive cargo rather than specifying maximum temperature limits for adjacent tanks. This approach did not take into consideration the risk of heat transfer from tank to tank across a cargo stow. The HMD in tanks 8P to 11P was clearly heated cargo and its temperature was maintained using the vessel’s cargo heating system. The cargoes in tanks 8C to 11C were not considered to be heated cargo; however, because of heat transfer, they were being carried at temperatures well in excess of the limits set out by Shell and Plastics Europe. It was entirely foreseeable, and could not have been unexpected, that the styrene monomer cargo in 9S would be heated by the cargo in 9C, which itself been had been heated by the HMD in 9P. The likelihood of elevated temperatures due to heat transfer was acknowledged in the TSG, which stated that ‘an increase in cargo temperature that is not related to ambient weather conditions or adjacent cargo temperatures may be an early indication that a polymerisation process has started’. The polymerisation of the styrene monomer on board Stolt Groenland indicates that the precaution of not stowing heat sensitive chemicals immediately next to heated cargoes is not always sufficient in meeting the ‘adequate’ segregation requirement of the IBC Code (see Section 1.14). The likelihood and extent of heat transfer from heated cargoes to heat sensitive cargoes via intermediate tanks must also be accurately determined. The stowage of the styrene monomer on board Stolt Groenland was planned by an experienced ship operator using the iStow programme, and appeared to comply with the applicable regulatory and onboard requirements and to align with industry guidance. The tanker’s C/O then scrutinised the proposed plan before it was approved by the master. However, although the maximum temperature of the styrene monomer cargoes, 85°F or 29.4°C, was stated on the certificate of inhibitor, no calculations were undertaken during the planning of the stowage to ensure that heating from adjacent tanks did not lead to this being exceeded. Instead, the ship operator, and the tanker’s master and C/O relied on their experience. This stemmed from several factors, including: ● The calculation of heat transfer was complex due to the differing SHCs, tank construction, tank levels, stowage durations, and other variables. Consequently, it was outside usual practice. ● The complexity of the heat transfer calculation was such that it was outside the scope of the iStow software. ● The master and chief officer’s knowledge of heat transfer was limited to the syllabus of the STCW training. They had also not previously encountered any difficulties when transporting styrene monomer. The instructions and guidance that were available in the IBC Code, TSG and the CDI guide were clear that heat sensitive and heated cargoes should not be stowed in adjacent tanks. However, little or no emphasis was placed on industry guidance, the potential for heat transfer through intermediate tanks, or how such transfer was predicted. Instead, reliance was placed on temperature monitoring.
43 2.8 TEMPERATURE MONITORING Stolt Groenland’s SMS required the temperatures of all non-heated cargoes, which included the styrene monomer in 9S, and the adiponitrile in 9C, to be monitored daily. To assist in meeting these requirements and to comply with the IBC Code, remote temperature measurement and temperature alarms were available via the Ariston cargo monitoring system. That Stolt Groenland’s crew were unaware of the elevated temperatures and polymerisation of the styrene monomer in 9S, until warned by the activation of the high-level alarm on the bridge front, indicates that the temperatures of the non-heated cargoes were not monitored at all, and that no temperature alarms were set. The crew also either did not notice, or did not recognise the significance of the elevated temperatures of the cargoes discharged in Kobe and Ulsan (Table 2), notably 8C (43.6°C), 8S (39.1°C), 11C (48.2°C), 9C (48.8°C), 10C (46.0°C) and 11S (38.4°C). In Ulsan, such oversight might have been due to competing demands encountered by the off-going and incoming C/Os when handing over during cargo operations. The absence of temperature monitoring of the non-heated cargoes stemmed from the crew’s view that styrene monomer was a benign cargo when inhibited, and that no previous problems or difficulties with its carriage had been experienced. Consequently, whereas the temperature of the heated cargoes was monitored and maintained, primarily for reasons of quality, the styrene monomer and the other non-heated cargoes that were transported at ‘ambient’ were less of a concern, even if heat sensitive. Had the temperatures of the styrene monomer been closely monitored and the maximum temperature of 85°F (29.4°C) stated on the certificate of inhibitor been adhered to, this accident would have been avoided. Concerns should have been raised and the charterer alerted well before Stolt Groenland entered the ports in Kobe and Ulsan, and maybe even before it left Houston. The charterer should have been informed once the temperature of the styrene monomer reached 30°C; this threshold was probably crossed before the vessel left Houston. The next opportunity to alert the charter and take urgent action was missed when the cargo temperature in 9S increased by 1°C on three consecutive days and 3°C in 24 hours (Figure 20). These two events occurred on 24 September while the vessel was in Kobe and 4 days before the explosion. The runaway temperature of 65°C was reached at about 1000 on 27 September, shortly before Stolt Groenland moved to the Yeompo quay. 2.9 ACTION IN THE EVENT OF POLYMERISATION The arrest of the polymerisation of styrene cargo in four of Stolt Focus’s cargo tanks was achieved ultimately by mixing the styrene with sea water (see Section 1.19.1). This action was successful, but it raises concerns over the options available to tanker crews encountering elevated styrene monomer temperatures. The certificate of inhibitor for the styrene monomer issued to Stolt Groenland on completion of loading (Figure 18) stated that if the maximum temperatures were exceeded then the cargo should be monitored for the inhibitor level and polymerisation, and additional inhibitor added as required. However; ● Stolt Goenland’s crew had no means to test for TBC concentration.
44 ● No means were available on board the tanker to test for polymers. ● The charterers did not provide additional TBC for the voyage. ● There were no means available to mix additional TBC with the styrene monomer. As a result, even if Stolt Groenland’s crew had identified the elevated temperatures in 9S. 6P and 6C, the actions stated on the certificate of inhibitor were not viable. In most cases, beyond monitoring tank and adjacent tank temperatures, and monitoring oxygen levels where a nitrogen blanket is used, the ability of tanker crews to prevent or arrest polymerisation of styrene monomer is limited to reducing tank temperatures either by cooling the tank exterior, or by flooding the tank with water. Therefore, it is important that the remedial actions to be taken, as listed on the certificate of inhibitor and associated guidance, are achievable and focused on sea transportation rather than shore-based processes. For reasons of expertise and practicability, this will probably be limited to seeking advice from cargo manufacturers or chemists ashore. 2.10 FIRE-FIGHTING The immediate reactions of Stolt Groenland’s and Bow Dalian’s crews to supress the fire with fixed foam appliance, and to abandon their respective vessels, were positive and assisted in ensuring their own safety. The fire on board Stolt Groenland burned for 5½ hours, during which time it spread from the manifold area to the accommodation block. The path of the fire spread was not clear during the on-site inspection, as the accommodation front was relatively free from significant damage. It is possible that the spread into the accommodation resulted from flammable styrene vapour entering from either the gas detection or cargo tank heating systems. The actions of the local emergency services were also timely and considerable given that Yeompo Quay was a general cargo berth and, unlike chemical and oil product terminals, there were no enhanced fire-fighting arrangements or emergency response procedures in place. Given the berth’s proximity to Ulsan and the Ulsan Bridge (Figures 1 and 6), and the toxic smoke that was emitted from the explosion and fire, the potential consequences to the surrounding environment were severe. 2.11 STOLT FOCUS INCIDENT The polymerisation incident that occurred on board Stolt Focus a couple of weeks earlier (Section 1.19.1) was of particular interest to the investigation as the two vessels had both loaded styrene monomer cargoes produced by the same supplier, in the same port, from the same shore tank during a similar timeframe. Furthermore, the voyage routes and therefore environmental conditions were similar. A key difference was that the target concentration for the TBC on board Stolt Focus was significantly higher (21ppm rather than 17ppm). This might have been due to the planned carriage time, however, the calculated effective days documented on the certificate of inhibitor was the same for both vessels (60 – 90 days). The cargo
45 stowage arrangements, the cause and magnitude of the elevated temperatures, and the circumstances that led to the elevated temperatures being identified on board Stolt Focus are unknown and therefore comparisons cannot be made. It was disappointing that Stolt would not provide any details of the Stolt Focus incident, particularly as the company had apparently not experienced any other similar accidents or near misses while transporting styrene monomer. It was also surprising that the company did not consider the occurrence to be a marine incident11 as defined in the IMO Casualty Investigation Code12. It is evident from the accident on board Stolt Groenland and the number of major styrene monomer explosions that have occurred on land, that the incident on board Stolt Focus, if not corrected would have endangered the safety of the ship, its occupants, and any other persons nearby. Therefore, in accordance with the Flag State regulations13, it should have been reported. In not reporting or informing other ships’ masters of the Stolt Focus marine incident, an opportunity to avoid the explosion in Ulsan was lost. In not sharing the circumstances of the incident with this investigation, an opportunity for the wider industry to learn more lessons from the near miss has been lost. Regardless of any commercial sensitivities, it would be beneficial to future safety if Stolt would inform the chemical tanker industry of any additional lessons it has learnt from its styrene monomer polymerisation occurrences. 11 A marine incident means an event, or sequence of events, other than a marine casualty, which has occurred directly in connection with the operations of a ship that endangered, or, if not corrected, would endanger the safety of the ship, its occupants or any other person or the environment. 12 Code of International Standards and Recommended Practices for a Safety Investigation into a Marine Casualty or Marine Incident. 13 Cayman Islands’ The Merchant Shipping Law (2016 Revision) – The Merchant Shipping (Marine Casualty Reporting and Investigation) Regulations, 2018.
46 SECTION 3 – CONCLUSIONS 3.1 SAFETY ISSUES DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS 1. The explosion and fire on board Stolt Groenland resulted from the runaway polymerisation of the styrene monomer cargo in cargo tank 9S. [2.2] 2. The polymerisation of the styrene monomer in 9S was initiated by the cargo’s elevated temperature for much of the voyage, which reduced the effectiveness of the TBC inhibitor. [2.3, 2.6] 3. The elevated temperature of the styrene monomer in 9S resulted from the transfer of heat from the HMD cargo in the port side tanks, via the adiponitrile cargo in 9C. [2.4] 4. The precaution of not stowing the styrene monomer next to the heated HMD cargo was not sufficient in meeting the adequate segregation requirement of the IBC Code. [2.7] 5. The probability of heat being transferred from the HMD cargo tanks to the styrene monomer cargo was not fully considered during the planning and approval of the cargo stowage. [2.7] 6. Calculations to predict heat transfer during cargo stowage planning were not conducted because they were complex and outside the capabilities of the ship operator and the tanker’s crew. They were also outside the scope of the cargo stowage software. [2.7] 7. Instructions and guidance were clear that inhibited cargoes should not be stowed adjacent to heated cargoes, but the likelihood of heat transfer through adjacent or intermediate cargo tanks was not covered in detail. [2.7] 8. Despite being a requirement in Stolt Groenland’s SMS, the temperature of the styrene monomer was not monitored, and the temperature alarms available on the cargo monitoring system were not set. The crew also either did not notice, or did not recognise the significance of, the elevated temperatures of the cargoes discharged in Kobe and Ulsan. [2.8] 9. The absence of temperature monitoring of the styrene monomer was influenced by the crew’s view that it was a benign cargo when inhibited, and that no previous problems or difficulties with its carriage had been experienced. [2.8]
47 3.2 SAFETY ISSUES NOT DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS 1. The actions to be taken on encountering elevated temperatures in the styrene monomer cargo on board Stolt Groenland, which were stated on the certificate of inhibitor, were not viable. The crew had no means of testing for TBC concentration or polymers, and no additional TBC was carried. [2.9] 2. Given the proximity of Yeomp Quay to Ulsan and the Ulsan Bridge, and the toxic smoke that was emitted from the explosion and fire on board, the potential consequences to the surrounding environment were severe. [2.10] 3.3 OTHER SAFETY ISSUES NOT DIRECTLY CONTRIBUTING TO THE ACCIDENT 1. In not reporting or alerting other tanker masters to a similar polymerisation incident that occurred 2 weeks earlier, an opportunity was lost to prevent this accident. [2.11]
48 SECTION 4 – ACTION TAKEN 4.1 MAIB ACTIONS The MAIB has issued an interim report that alerted the chemical tanker industry to the circumstances of the accident and requested information about previous similar accidents or incidents. 4.2 ACTIONS TAKEN BY OTHER ORGANISATIONS Stolt Tankers B.V. has:
● Issued fleet notices highlighting issues with inhibited cargo carriage.
● Introduced a requirement for ships to report cargo temperatures to the ship operator ashore three times per week.
● Revised procedures for the setting of cargo-related alarms.
● Enhanced procedures for the checking of cargo stowages that contain both heated and inhibited cargoes.
● Commenced a concerted campaign through its marine compliance officers to raise crew awareness of inhibited cargoes.
● Started to investigate the possibility of upgrading its cargo stowage software to calculate and predict heat transfer within a stowage containing both heated and heat-sensitive cargoes.
● Started to work with manufacturers and industry bodies to ensure that cargo- handling instructions and protocols for inhibited cargoes are practical and achievable.
● Investigated the use of polymer testing equipment on board ships. Unfortunately it was not considered a viable prospect with current technology. The Ministry of Oceans and Fisheries, Republic of Korea has prohibited ship-to-ship transfer operations for dangerous cargo on general cargo berths in Ulsan. The International Chamber of Shipping has amended the Tanker Safety Guide (Chemicals), published January 2021, section 6.3.4 Stowage planning, to make it clear that:
● The stowage of heated and inhibited cargoes can result in a dynamic situation in which the degree of heat transfer may be complex and difficult to predict.
● One tank separation between heated and heat sensitive cargoes might not be sufficient. The Chemical Distribution Institute has instigated the production of a best practice paper regarding the dosing of ship cargo tanks which will address, among other things, inhibitor quantity validation.
49 SECTION 5 – RECOMMENDATIONS Cayman Island Shipping Registry, through the UK as the Member Government for the Red Ensign Group to the International Maritime Organization, is recommended to: 2021/117 Propose to the IMO a revision to Section 15.13 of the IBC Code to:
●Include in the certificate of protection the actions to be taken in the event of a cargo falling outside of the manufacturer’s specified oxygen and temperature limits, and that
●Any actions should be realistic, taking account of the limitations on board ships regarding the monitoring, adding, and mixing of inhibitor during the voyage. International Chamber of Shipping is recommended to: 2021/118 Promulgate this report to its members. INTERTANKO is recommended to: 2021/119 Promulgate this report to its members. Chemical Distribution Institute is recommended to: 2021/120 Amend its publication ‘Chemical Tanker Operations for the STCW Advanced Training Course – A Practical Guide to Chemical Tanker Operations’ to make it clear that:
●The stowage of heated and inhibited cargoes can result in a dynamic situation in which the degree of heat transfer may be complex and difficult to predict.
●One tank separation between heated and heat sensitive cargoes might not be sufficient.
●Promulgate this report to its members. Plastics Europe (Styrene Producers Association) is recommended to: 2021/121 Work with its members to incorporate the lessons learned from this accident in its Styrene Monomer: Safe Handling Guide. Stolt Tankers B.V. is recommended to: 2021/122 Share with INTERTANKO the circumstances and lessons learned from the Stolt Focus incident and the results of its research into improved stowage software, to enable prediction of heat transfer and cargo behaviour. Safety recommendations shall in no case create a presumption of blame or liability.
Marine Accident Report
FD06070 | 2021_英国_crush-incident-on-scallop-dredger-olivia-jean-with-loss-of-1-life__2021-05-OliviaJean-Anne.pdf
分类:06_境外及港澳台调查报告 | 年份:2021 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
Annex A Crew induction proforma
OLIVIA JEAN TN 35 www.safetyfolder.co.uk Crew Induction form The location and use of safety equipment and fire equipment: Liferaft Location Life jackets & lights & whistles Lifebuoy and light Pyrotechnics EPIRB First aid equipment Portable fire equipment Fixed fire equipment & detection Deck / fire pump & hose/s Vent closures / fuel shut offs Fire buckets with lanyards Wear and use of PFD`s. The routine operation, procedure or general knowledge of: Windlass / anchoring Preparing vessel for sea Watch keeping responsibilities LPG system Berthing mooring lines Fishing equipment & safety Helm / engine controls & pilot Electrical & emergency electrical Communication equipment Refuelling Bilge & tank pumping Hatches and closures Garbage / oil / sewage disposal Record keeping Incident reporting Navigational equipment The response in the event of an emergency: General alarm signal Medical / injury Fire on board / E/R alarms Escape routes Person overboard Abandon vessel / remain with vessel Flooding / grounding / bilge alarm Fixed fire equipment & detection Deck / fire pump & hose/s Vent closures / fuel shut offs Metal buckets with lanyards Acknowledgement of instruction provided by the master / owner and received by the crew for those items initialled above Name of Crew Signature & Date Name of Owner / Skipper Signature & Date Name of Emergency Contact for crew Phone 12 / 35
Annex B Olivia Jean’s risk assessments
Annex C MAIB Safety Flyer to the Fishing Industry
SAFETY FLYER TO THE FISHING INDUSTRY Fatal accident to a crewman on board the scallop dredger Olivia Jean (TN35), north-east of Aberdeen, Scotland on 28 June 2019 Narrative At about 2200 on 28 June 2019, an Indonesian crewman on board the scallop dredger Olivia Jean was fatally injured after being struck on the head by one of the vessel’s scallop dredge towing bars while working on deck. The crewman had replaced two worn dredges on the towing bar and stood clear as the skipper used the winches and derrick to lift and realign the gear against the vessel’s tipping door. Unfortunately, one of the towing bar’s securing chains had not been released and the dredge gear became snagged. Although the skipper shouted instructions to the crewman to remain clear as he attempted to free the gear, the crewman stepped between the snagged bar and the accommodation superstructure just as the snagged bar released and swung inboard. The crewman suffered crush injuries to his head and was airlifted from the vessel and taken to hospital for emergency treatment. He died 12 days later. The dredge gear winches and the two crew members working on deck were being controlled by the skipper from the wheelhouse. The location of the accident was out of the skipper’s line of site and he was reliant on a CCTV screen that was positioned behind him to monitor the area. The deck crew’s level of English comprehension was poor, and they did not speak a common language. Olivia Jean
In August 2020, a British crewman on the Olivia Jean was struck by a towing bar during a dredge gear shooting operation. He moved out of the designated safe zone before being given the clearance to leave, stepped into an unsafe area and was struck by the towing bar when it unexpectedly moved. The injured fisherman was taken to hospital for emergency treatment. Safety lessons
- The shooting, hauling, and moving of dredge gear are extremely hazardous activities that need
to be tightly controlled. No matter how experienced the crew on deck might be, they need to be properly supervised and their safety closely monitored.
- The crew on deck may not be visible to the winch or machinery operator, so clear, explicit and
easily understood communications are vital to the avoidance of dangerous situations from developing. This is particularly the case where the crew do not share the same first language.
- Learning lessons from previous accidents can prevent injuries and save lives. In this case, the
lessons learned and corrective action implemented did not prevent a near identical accident from occurring to the crew on board in August 2020. It was very fortunate that it did not result in another fatality. This flyer and the MAIB’s investigation report are posted on our website: www.gov.uk/maib For all enquiries: Marine Accident Investigation Branch First Floor, Spring Place 105 Commercial Road Southampton SO15 1GH Email: maib@dft.gov.uk Tel: +44 (0)23 8039 5500 Publication date: May 2021 Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an such investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This safety flyer is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2021 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned.
FD06071 | 2022_英国_person-overboard-from-motor-cruiser-diamond-emblem-1-with-loss-of-1-life__2022-5-DiamondEm.pdf
分类:06_境外及港澳台调查报告 | 年份:2022 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
Annex A Funnell 42 Sundeck Ferry Emblem Fleet Declaration of Conformity
Declaration of Conformity
Manufacturer Ferry Marina Ferry Road Horning Norfolk NR12 8PS
Description of the Craft Brand Name:
Funnell 42 Sundeck Type:
Fully decked motorboat Type of Hull:
GRP low wash hull Design Category:
D Propulsion type:
Inboard diesel engine Installed engine power:
32kw Maximum engine power: 45kw Length:
- 8m
Beam:
- 66m
Craft Identification Number:
This declaration of conformity is issued under the sole responsibility of the manufacturer. I declare on behalf of the craft manufacturer that the craft mentioned above complies with all applicable essential requirements in the way specified.
Name: ____________________________ Position: ____________________
Signature: ___________________________________
Documentation and Standards used to comply with essential safety requirements 2.1 CIN
EN ISO 8666:2002 2.2 Builders plate
EN ISO 10087:2006 2.3 Protection from falling overboard
Empirical test data 2.4 Visibility from steering position
Technical manual pg 1and Appendix K 2.5 Owners manual
BS EN ISO 10240:2004 3.1 Structure
Empirical data 3.2 Stability and freeboard
Trial data following MCA code of practice 3.3 Buoyancy and flotation
Trial data 3.4 Openings
BS EN ISO 12216:2002 and CE marked doors and windows 3.5 Flooding
Technical manual Appendix B 3.6 Maximum recommended load
Technical manual pg 4 3.7 Liferaft stowage
Technical manual pg 5 3.8 Escape
Technical manual pg 5 and Appendix B 3.9 Anchoring, mooring and towing
BS EN ISO 1584:2003 4.0 Handling Characteristics
Trial data in Appendix C 5.1 Inboard engine, ventilation and exposed parts Technical manual pg 5 & 6 5.2 Fuel system and fuel tanks
BS EN ISO 10088:2001 and Appendix F 5.3 Electrical systems
BS EN ISO 10133:2001 5.4 Steering systems
Technical manual pg 6 5.5 Gas
Technical manual pg 7 and Appendix A 5.6 Fire protection
Technical manual pg 7 and Appendix B 5.7 Navigation lights
Technical manual pg 8 and Appendix D 5.8 Discharge prevention
Technical manual pg 8
Annex B Funnell 42 Sundeck Ferry Emblem Fleet Technical Manual
Funnell 42 Sundeck Ferry Emblem Fleet
Technical Manual Page 1 of 9
INDEX
Boat Design Category 2.1 CIN 2.2 Builders Plate 2.3 Protection from Falling Overboard 2.4 Visibility From Main Steering Position 2.5 Owners Manual 3.1 Structure 3.2 Stability and Freeboard 3.4 Openings in Hull, Deck and Superstructure 3.5 Flooding 3.6 Recommended Load 3.7 Life-raft Stowage 3.8 Escape 3.9 Anchoring, Mooring, Towing 4 Handling Characteristics 5.1 Engine, Engine Ventilation, Exposed parts 5.2 Fuel System 5.3 Electrical System 5.4 Steering System 5.5 Gas System 5.6 Fire Protection 5.7 Navigation Lights 5.8 Discharge Prevention 5.9 Toilet System 5.10 Water System Appendix A Gas system Appendix B Openings, downflooding heights, escape, fire protection Appendix C Handling Appendix D Electrical diagram Appendix E Steering system Appendix F Fuel System Appendix G Toilet system and water system Appendix H Standards used Appendix I
Parts used Appendix J Wiring numbers Appendix K Visibility
Funnell 42 Sundeck Ferry Emblem Fleet
Technical Manual Page 2 of 9
1 Boat Design Category
The vessel is to be Category D as per RCD and Category A for MCA stability requirements. Requirements for Category D as follows - This craft is designed to operate in winds of up to Beaufort force 4 and the associated wave heights (occasional maximum waves of 0.5m). such conditions may be encountered in sheltered inland waters and in coastal waters in fine weather.
- 1
Craft Identification Number
The CIN number will be made up as such for each boat. GB-FYM 36
G
01
C 9 09
Manufacturers code / Length / Type / Number of Build / Month / Year / Model year
The CIN number will be sandblasted to an area close to the transom on the starboard aft corner. It will also be placed in the inside of the boat behind the rudder position.
- 2
Builders Plate
The builders plate will be an engraved plate attached to the lower part of the lower helm position. It states the recommended load, maximum numbers of persons, design category, CE logo, Ferry Marina.
- 3
Protection from Falling Overboard
There are handrails located all round the deck area, also a rail around the screen area on the front deck. There is a hand rail on the aft steps up to the upper helm. These rails are all made from 316 stainless steel with a diameter of 1”, they are screwed in place onto the superstructure. There is a high toe rail all round the side decks to help prevent slipping. As a means of re-boarding there is a set of rails permanently attached on the transom with a grab bar above the deck to assist re-boarding.
Funnell 42 Sundeck Ferry Emblem Fleet
Technical Manual Page 3 of 9
- 4
Visibility from the Main Steering Position
The main steering position is from the upper helm. This position gives clear all round vision in all directions, however, there are large blind spots at the waterline level as shown in Appendix K. These blind spots will only hinder visibility at waterline level not where other larger vessels are present, as shown on the second diagram, these are easily visible from the seated position. Small canoes etc will not be seen if in blind spots for up to 5m away from the standing helm position. Movement up to 1m away from the helm position will reduce this blind spot down to 2.8m astern and 2.5m on the port side. Approx height for the canoe measurement is given at 60cm above the water. The lower helm does not give any visibility astern or to starboard aft sections. There is a warning notice in place for this at the helm position.
- 5
Owners Manual
See attached manual.
- 1
Structure
The hull and superstructure have been manufactured by Waveney River Centre Limited or Hardy Marine. The hull and superstructure are bonded together using two layers of GRP and flow coat overtop to ensure water tightness. The floor bearers are constructed from 3” wood of various lengths and depths, all floor bearers have been glassed over. The entire bilge area has been flow coated to ensure water tightness. The bulkheads are made from ¾” pre-laminated ply wood. The bulkheads have been bonded to the superstructure and floor using freefix along the joints. The deck supports are constructed from 1” ply and are glassed into place. The roof throughout the aft cabin is mainly a false roof, this is constructed by forming a batten lattice across the void and using soft lined panels attached to the battens. Some of the saloon roof is also constructed in a similar way. The rest of the saloon roof is loft lined panels, these are attached to spacing battens onto the inner GRP. The design was completed by John Moxham – Marine Architect, all calculations with regards to scantlings etc. were made by him prior to handing over completed drawings.
Funnell 42 Sundeck Ferry Emblem Fleet
Technical Manual Page 4 of 9
The Rubbing strips are made from 2 ½” rubber D section which is bolted in place.
- 2
Stability and Freeboard
The test carried out for stability and freeboard allowed for ten people at 85kg each (average). The test was carried out at this level to allow for a change of layout to accommodate more people, or to allow for a private vessel taking friends on board. The vessel was tested with all people to the port side and starboard side, with the driver staying at the helm position. Sharp right and left turns were completed at different speed intervals to test stability.
- 4
Openings in the Deck, Hull and Superstructure.
See Appendix B for locations
- 5
Flooding
The roof vents are of a UFO type which prevent ingress of water. The hull vents are over 600mm above the waterline. The through hull fittings all remain over 250mm above the NLWL. There is one bilge pump fitted capable of pumping 1000 gallons per hour. Openings shown in Appendix B
- 6
Recommended Load
Fuel
149kg Water
528kg Waste
419kg Persons 8 600kg (75kg each) Luggage
320kg (40kg each)
Total 2016kg
Total stated on the builders plate for people and luggage 920kg.
Funnell 42 Sundeck Ferry Emblem Fleet
Technical Manual Page 5 of 9
- 7
Life raft Stowage
A stowage point is available on the upper helm area, a label is affixed here for reference.
- 8
Escape
Escape points are located in Appendix B.
- 9
Anchoring, Mooring and Towing
There are six stainless steel cleats located around the deck area. These are bolted in place with a wooden pad underneath and washers to prevent the bolts being ripped out of the deck. These cleats are suitable for use to tie off mooring ropes and tying off any mud weights. The fwd and aft cleats are suitably strong enough for emergency towing. The boat is not designed to tow another vessel for any long distances. The boat can be towed either along side a tug boat or using the front cleats. There is a recess for the mud weight on the front deck, the mud weight is not suitable for use on the aft deck, this is stated in the owners manual.
4 Handling Characteristics
See Appendix C for data on the handling characteristics.
- 1
Engine, Engine Ventilation and System
The engine is located under the aft centre section of the saloon seating. It is contained over an engine tray which has be flow coated to ensure no ingress of oil into the GRP.
Funnell 42 Sundeck Ferry Emblem Fleet
Technical Manual Page 6 of 9
The engine bearers are constructed from 1 ½” laminated ply, which have been glassed into place. The engine is mounted onto the beds using coach bolts and rubber mountings. Ventilation for the engine comes under the floorboards from large hull vents both sides and is also fitted with an extractor fan, linked to the ignition system.
- 2
Fuel System
The 186 ltr fuel tank is located in the mid double cabin under the deck area. The tank is screwed into place using the welded tags on the corners of the tank. An electronic fuel gauge is located in the dash. The filler pipe and vent pipe are ISO 7840 type pipe. The vent pipe is located above the level of the filler. The vent is fitted with a flame trap. The deck filler is clearly marked for use with diesel with a red engraved label. The fuel feed and return for the engine are piped to the filter in seamless copper. The pipes onto the engine are piped using ISO7840 type fuel flex. The filter is all metal and conforms to the fire resistance specification. The manual fuel shut off is located next to the filter. There is also an electrical fuel shut off located next to the manual shut off, this is operated from a feed to the ignition. The fuel is automatically shut off when the ignition is turned off and switched on when the ignition is on again. The fuel line to the Eberspacher heater is also piped in seamless copper. The fuel shut off for the heater is located next to the heater. All fuel lines are clipped at recommended intervals to remove any vibration. The diagram for the fuel system is located in Appendix F.
- 3
Electrical System
A complete diagram of the electrical system can be found in Appendix D.
- 4
Steering System
The steering system is operated using hydraulic pipes. The diagram for the pipe locations is located in Appendix E. The steering system can be operated from the upper and lower helm positions.
Funnell 42 Sundeck Ferry Emblem Fleet
Technical Manual Page 7 of 9
The underwater gear is manufactured from brass and stainless steel. The rudder size has been calculated from empirical data. In an emergency a bar can be attached to the steering arm so that the rudder may be used. This is located under the aft step area. All the hydraulic hoses for the steering system have been pre-made with crimped on ends.
- 5
Gas System
The gas system has been fitted by a CORGI fitter to ensure compliance. The gas system consists of a four burner hob and a separate oven and grill unit. The gas system is piped from the locker to the appliances in seamless copper. The gas locker is located under the exterior aft steps. An UPSO/OPSO device has been fitted for maximum protection. The test tee is located at the back of the hob unit. The pipe is clipped at the recommended intervals throughout and is run along a wooden batten with no contact with the GRP hull. Where the pipework passes through bulkheads it is protected with plastic sheathing. The drain for the gas locker is made from BS3212/2 type pipe. There are two gas bottles fitted. The ventilation has been calculated as follows
Hob Unit = 6.55 kw 14410 mm Oven unit = 3.1 kw 6820 mm 8 people =
5160 mm
Total needed
26390 mm Upper and lower
13195 mm (18.5”)
The ventilation is achieved by using roof vents in the main saloon for the upper ventilation. The lower ventilation is vented through into the cabin space from the hull vents. Diagram located in Appendix A.
- 6
Fire Protection
There are three fire extinguishers, the location is shown on Appendix B.
Funnell 42 Sundeck Ferry Emblem Fleet
Technical Manual Page 8 of 9
They are rated as 8A34B each and are Kite marked for third party testing. There is a fire blanket located next to the cooker for emergency use. The gas system has isolators for the oven and hob, also a main isolator located on top of the bottle. The fuel system has an automatic shut off and a manual shut off. The heater has a shut off for the fuel. The electrical system has isolators for immediate switch off in an emergency. Escape can be made from the vessel via the back door of the side door, as shown in Appendix B. There is also a roof hatch located above the galley area.
- 7
Navigation Lights
None fitted on hire fleet models
- 8
Discharge Prevention
The toilet pumps waste into stainless steel tanks. One is located behind the aft toilet, the other is located under the aft cabin berth. The engine is located above an engine tray which would catch any oil or fuel discharge to prevent any accidental pumping out overboard. The diesel filler is located behind a toe rail, so any spilt fuel would remain on the deck for easy clean up, rather than accidental discharge into the river.
- 9
Toilet System
The toilets are piped directly to stainless steel waste tanks using white sanitary hose. The deck fittings are located on the aft deck and starboard side deck. The flush water for the toilets comes from the fresh water tank, the pipe is fitted with a NRV to prevent any water getting back through the pipe. The tanks are fitted with a gauge. A diagram for the water system is located in Appendix G.
Funnell 42 Sundeck Ferry Emblem Fleet
Technical Manual Page 9 of 9
- 10
Water System
There are two stainless steel water tanks. One located under the saloon floor and the other located under the aft section of floor in the twin cabin. The water tank is piped up to the galley sink, heads sink, toilet and shower. There is a 55ltr calorfier which is heated up from the engine, or immersion element. The water is piped using acorn pipe and fittings. Diagram shown in Appendix G.
6 Finish
The interior is finished in dark oak and white formica. The soft lining has been completed by JB Boats and is used on all the sides and roof lining panels. The windows are made by Houdini and are constructed to BS EN ISO 12216:2002, the windows are fitted using foam tape as the sealant. The windows are black anodised in finish. The fabric used on the interior cushions has been made and supplied by JB Boats. The kitchen units are bought from Howdens.
Annex C Funnell 42 Sundeck Ferry Emblem Fleet Owner’s Manual
OWNERS MANUAL
Manufacturer
Ferry Marina Length
42’ (12.8m) Beam
12’ (3.65m) Maximum air height
8’6” (2.6m) Maximum draft
2’6”(0.75m)
Maximum Load
75 Kg per person
(8 people maximum)
600kg for people
320kg for luggage
920kg Total Weight of tanks
149kg – fuel
528kg – Water
419kg – Waste
Total additional weight to boat 2016kg
WARNING – Do not exceed the maximum recommended number of persons. Regardless of the number of persons on board, the total weight of persons and equipment must never exceed the maximum recommended load. Always use the seats/seating places provided.
WARNING – When loading the craft, never exceed the maximum recommended load. Always load the craft carefully and distribute loads evenly to maintain trim (approx. level) Avoid placing heavy weights high up.
Unladen weight of craft
- 5 ton
General Construction
GRP with wood interior
Design Category
D
Maximum engine rating 45kw
Fuel tank capacity 186 ltr
Water tank capacity 281ltr + 172ltr + 55ltr calorfier
Waste tank 163 ltr + 186 ltr
Definitions and Terms Danger – Denotes that an extreme intrinsic hazard exists which would result in high probability of death or irreparable injury if proper precautions are not taken. Warning – Denotes that a hazard exists which can result in injury or death if proper precautions are not taken Cautions – Denotes a reminder of safety practices or directs attention to unsafe practices which could result in personal injury or damage to the craft or components or to the environment.
Category D - This craft is designed to operate in winds of up to Beaufort force 4 and the associated wave heights (occasional maximum waves of 0.5m). such conditions may be encountered in sheltered inland waters and in coastal waters in fine weather. Safety Features
Boarding ladder – This is located on the transom and is fixed using bolts.
Life ring – This is located on the sundeck.
Handrails – These are made from stainless steel and screwed into the GRP. These are located along the roof for support when moving around the decks. There is also a pulpit rail at the front for support when using the front deck. Caution Care must be taken when moving around the deck as the deck has a step in it.
Fire extinguishers – There is one extinguisher located near the galley on the left. There is one extinguisher located near the
helm position. There is one extinguisher located next to the aft berth. Warning These should be looked after and serviced or replaced as necessary. Check the expiry and service information on the extinguisher. Always replace life for like.
Fire Blanket – This is located on the back of the cupboard door next to the cooker, within easy reach of the cooking facility. Warning Once used this should be replaced like for like. This item should checked regularly in accordance with manufacturers recommendations.
Bilge Pump – There is an automatic bilge pump located in the middle of the bilge area under the aft cabin floor WARNING – The bilge pumping system is not designed to prevent sinking in the case of serious hull damage or capsize etc. SPECIAL PRECAUTION – Check the function of all bilge pumps at regular intervals. Clear pump inlets from debris. Escape – The means of escape are via the back door or through the side door opposite the helm. Warning These exits should never be locked when the boat is in use.
Liferaft stowage – There is stowage space for a life raft on the aft roof. The location is indicated with a sign. The craft is not provided with a liferaft.
Ventilation – The fixed ventilation is provided through the spaces between the sliding canopies. Caution These vents must not be blocked.
Emergency Shut offs The manual fuel shut off is located under the saloon seating. The fuel system is fitted with an automatic fuel shut off, the fuel is shut off when the ignition key is switched off. The battery isolator shut offs are located on the steps. The gas shut offs are located on the cupboard front next to the cooker, the main shut off in the locker can also be used. The heater shut off can be accessed behind the saloon seating on top of the fuel tank. Caution The manual fuel and battery shut offs should only be used in an emergency. Warning The gas isolators should always be switched off when the system is not in use.
Locations of the isolators Behind aft saloon back rest
Fuel shut off Behind aft saloon back rest
Weed filter Behind the port saloon back rest Heater fuel shut off On the steps
Battery isolators
Using the Boat
Engine The engine is located under the saloon seating and can be accessed by removing this seating. Caution It is best not to access the engine while it is running, or just after, as it will be hot. Any accessing of the engine should be done by a qualified engineer, with the exception of checking the oil levels and regular checks for general condition or leaks. Caution Each time you start the engine check there is a flow of water leaving the exhaust, this will ensure that the water is getting to the cooling system. If for any reason you suspect the engine is overheating, try to tie up as quickly as possible and switch it off. Check the weed filter, if this is full of weeds, clear it out, wait for the engine to cool down and then re-start. If the engine over heats again, call an engineer out. Caution When re-fuelling the engine must be switched off, gas appliances must be switched off and any cigarettes etc extinguished. Check that the fuel tank breather is clear of debris, this is located just above the fuel filling point. Never try to overfill the tank. Any spillages must be cleaned up using soapy water, as spilt fuel is flammable and very slippery. Caution The engine must be serviced regularly to ensure it is kept working correctly.
Schedule of checks to make Each use – check the weed filter, check water is running from the exhaust. Once a week during use – check the oil level in the engine, check the coolant in the header tank, check the bilge water level, check the bilge pump is functioning.
12v Electrical system The boat has a 12v electrical system on board and a 240v electrical system. The batteries are located under the port side saloon seats, the isolator is located on the steps. The battery isolator should be switched off each time the boat is left, to avoid battery drainage. The fuses are located at the helm position, these are the car type, once blown these can be removed and replaced like for like. The batteries vent into the outside. If the batteries need to be changed or charged off the boat, this should be done by a qualified engineer. The batteries have terminal covers fitted, to prevent the terminals being accidentally shorted out, these covers should only be removed when removing the battery. The batteries are strapped down to prevent movement, these straps should not be removed. Any battery replacement should be like for like. The 12v battery system runs the lighting, radio, water pump, engine equipment, fridge, wiper, horn, bowthruster, bilge pump, shower pump and 12v sockets. Caution If the batteries are not kept charged these systems will not work. The batteries can be charged in three ways. 1 – the engine will charge the batteries when running, 2 – the solar panels will
charge the batteries in daylight, 3 – if you plug into shore power the battery charger will charge the batteries. The bilge pump is connected directly to the batteries so it cannot be turned off, all other electrics are switched off when the battery isolators are switched off. To conserve power only leave on the items which you need.
Bowthruster This can be used from the upper and lower helm positions. There is a switch on the dash for this. Once turned on, you use the lever to either move left or right. Caution When using the bowthruster do not use it for more than 10-15 second bursts as it may damage the motor. Ensure that the oil levels for the thruster motor are check regularly, there is a top up bottle located near the bowthruster.
240v system The 240v system consists of battery charger, mains sockets, power for the fan oven and immersion element for hot water. The 240v system can be run in two ways. 1 – From hooking up to shore power or 2 – using the inverter to convert the 12v battery system up to 240v. INVERTER Caution Using the inverter system is only for use when the boat is not connected to shore power. The inverter system will not run all of the features, it must only be used for sockets and fan oven. When using the inverter be careful not to overload the sockets, do not plug multiple appliances in at once, do not use an electric kettle, do not use appliances which draw over 2kw. Using the inverter will drain the batteries especially when using hair dryers etc. The inverter will need to be turned on in two places, on the 240v switch panel and on the inverter panel. Warning The inverter must NEVER be turned on if the shore line is connected. SHORE POWER To use shore power, connect the shore lead to the socket on the back of the boat to the socket on shore. The sockets will only fit one way round. Connecting to the shore power will enable you to use all of the 240v system and the batteries will not be affected. To use the 240v system, the appropriate switches must be turned on at the switch panel located next to the helm position.
Gas System The gas bottle is located in the locker on the aft deck. The gas system consists of the cooker and the hob unit. In order for these items to work, the main gas bottle and isolator need to be turned on, then the appliance isolator needs to be turned on. For the fan oven to work the 240v system must be operational, either on shore power or using the inverter. There is a test point for the gas system behind the back of the worktop. This should be tested at least yearly to ensure the system is working correctly and is not leaking. If any gas leak is suspected open any doors or windows and switch off the gas, call an engineer to assess the problem.
Ensure all isolators are switched off when the system is not in use.
Boat Handling Make sure you have selected the correct helm position, the handle will point to the selected position. Ensure you start the engine before untying the boat. Always start the boat out of gear. When manoeuvring in moorings or tight spaces, do so at a slow speed (Caution), using the reverse gear as a brake. Moor into the wind and tide whenever possible. Use the bowthruster to push the bow into position. Note: the bowthruster is only effective at low speeds. Caution When using the lower helm position, visibility is obstructed to the rear, obtain a lookout as necessary or use the upper helm. Use the lower helm when going under bridges. The highest point on the boat is the upper helm steering wheel. Caution There are blind spots from the upper helm position with regard to small items such as canoes and dinghies. From and standing position with a 1m movement in any direction there will be up to a 2.8m blind spot astern and a 2.5m blind spot to the port side.
Special warnings and precautions on using the boat
Bilge water should be kept to a minimum and should be checked regularly Stability is reduced by any weight added high up, this includes people sitting on the roof. Warning No one should sit on the roof at any time, or stand on the decks while in motion. Sitting on the sundeck seats is fine. Ensure there is always water running from the exhaust, this will ensure a flow of cooling water to the engine. Warning Ensure that the fixed ventilation is not blocked Caution When refuelling ensure that the engine is switched off and there are no flames or lit cigarettes etc. if for any reason fuel spills either from the breather or rises out of the filler pipe it must be cleaned up and the cloths disposed of correctly. Caution The spillage should be washed with detergent as spilt fuel is extremely slippery. Caution Never store equipment etc in the engine bay. Caution Never store equipment etc in the gas locker. Warning Never fit curtains or flammable materials near the cooker. Warning A risk of fire or explosion is associated with the electrical system on board. To remove and reduce this risk follow the following procedures. Only use the correct size fuses. Do not add spurs in a circuit. Always keep the covers on the battery terminals to prevent the risk of shorting. Disconnect the battery when working on the electrical system. Have the system inspected a regular intervals. Do not allow cables to chafe or run in water or next to hot items. Do not make sudden manoeuvres at speed. Do not use the mud weight on the aft deck.
Cleaning and Maintenance
The exterior of the vessel can be cleaned using soapy water. For marks and ingrained dirt these can be removed with GRP compound paste and polished off. The windows should be cleaned with an appropriate window cleaner. The interior woodwork can be cleaned with a damp cloth. The interior Formica can be cleaned with a non abrasive washroom cleaner. The hob top can be cleaned with a damp cloth. The toilet can be cleaned with a non bleach toilet cleaner. The floors can be washed off with a non abrasive cleaner and water. The cushions can be wiped off with a damp cloth.
Annex D Extract from Diamond Emblem 1’s Skippers’ Manual, showing Emergency Procedures
4 EMERGENCY PROCEDURES Fire n Evacuate the boat n Call 999 n Use fire extinguishers only if safe to do so Gas Leak n Evacuate the boat n Isolate the gas if safe to do so n Call us for help n Do not touch the electrics Collision n Let us know of any collisions straight away so we can assess any damage and liability n Make notes and get the names and registrations of the boats involved n If you suspect any damage to the hull under the waterline, evacuate the boat and call us for help n Minor knocks and bumps are expected Running Aground n Turn the engine off n Drop the mud weight and leave some slack to allow for the tide to rise n Call us for help Man(woman/child) overboard n Stop the engine - to ensure the propeller is not turning n Signal over boats in the area to stop n Throw the lifering near the person not at them n Don’t jump in after another person IMPORTANT INFORMATION
Annex E Diamond Emblem 1’s Your Boat Information document
Annex F Extract from Code for the Design, Construction and Operation of Hire Boats, 2009 – Section 5: Operational Standards
Section:5 Operational Standards This section is primarily concerned with the way in which boat hirers, who may have little or no previous experience, are provided with sufficient information and instruction to enable them to safely undertake the trip. It follows the stages of a trip through from booking, to departure from the hire base, to the conclusion of the trip. (Note: This section is based on the national hire boat and day-boat handover schemes run by the British Marine Federation, references 8 and 9) 5.1 Pre trip information Advanced booking gives an opportunity for the hire operator to provide the hirer with information both on navigating boats in general, such as using locks, rules of the road, mooring etc, and on the area in which they will be boating. General information is also available from some navigation authorities and industry associations10. Navigation Authorities will often produce cruising notes. 5.2 Handover procedures Whether the boat is a large well-equipped cruiser designed to provide living accommodation for several weeks, or a simple day-boat, it is essential that before the hire operator gives control of the boat to the hirer a systematic and documented handover procedure, appropriate to the type of boat and its area of operation, is followed. This will cover topics which include:
a) Equipment.
Gas and electric appliances, and sanitary facilities.
b) Using the boat
Steering, stopping and mooring
Awareness of access limitations to ensure stability (see section 3.1 of Appendix 3
for detail)
Use of locks, swing bridges etc
Awareness of navigation hazards (e.g. weirs, tidal flows and/or river flows,
commercial traffic, shallow water etc)
Speed limits
Restrictions to navigation notified by navigation or harbour authorities, or the MCA.
c) Safety Equipment.
Life jackets 10 The Boaters Handbook. Published by British Waterways and the Environment Agency. Also available in CD ROM. RYA Publication, Inland Waterways Handbook. Hire Boat Code. Issue 1: Technical and Operational Standards Page 27
Lifebuoys, throwlines etc d) Briefing material The handover should be supported by briefing material (a ‘Boat Manual’) left in the boat which provides full information on:
Personal safety
Safe use of appliances fitted in the vessel – cookers, stoves, heaters etc
Safety on the move
Safety equipment and its use
Navigation rules, including speed limits, speed, giving way, etc.
Mooring (where and how)
Dealing with fouled propellers, going aground, etc
Navigation features and hazards such as locks, weirs, currents, tides etc
Detailed reference information on how the boat works
Contact information including for emergencies e) Communications
Using the contact material in the boat manual. f) Dealing with emergencies
Man overboard
Breakdown
Use of fire extinguishers/blankets
Emergency contact details
Recording and reporting It is essential that the briefing is done by a competent and experienced member of the hire operator’s staff who can deal confidently with any questions the hiring party may have. 5.3 Competence Assessment During or at the completion of the handover briefing, the hire operator must decide whether the hirer and his party are sufficiently competent to be allowed to take the boat out. Reasons for not doing so would include:
Inability of the skipper(s) to demonstrate adequate control (even after repeated instruction)
Perceived impairment through drink or drugs
Inadequate resources available to the party to control children safely or supervise persons with special needs. If the decision is made not to permit the boat to go out, this should be recorded in the handover documentation. Hire Boat Code. Issue 1: Technical and Operational Standards Page 28 Throughout the handover process, the person giving the instruction should take account of any qualifications (for example, RYA Inland Helmsman) or previous experience professed by the skipper(s), however this should only be recognised as an opportunity to accelerate the briefing, not dispense with it. 5.4 During and after the Hire Period At the conclusion of the hire period the hirer should have the opportunity, where practicable, to report back to the hire operator on any problems or incidents that occurred. These would
include:
Accidents
Breakdowns
Vandalism or anti-social behaviour Hire operators must be aware of the statutory duty to report certain types of accident involving the use of hire craft to the Marine Accident Investigation Branch11. In the interests of building a better understanding of boating accidents, their frequency and causes, hire operators are encouraged to pass on details through their navigation authority, or BMF, for inclusion in the IRIS database12. 5.5 Documentation The handover process is an essential element of delivering a safe boat trip to the hirer. It is
important that an audit trail of its delivery is maintained. This will include:
Booking terms and conditions
Booking confirmation
Customer log sheet. The record of when the hirer and his party arrived and
departed, party member names, delivery of handover.
Boat acceptance certificate. A record of the handover and the hirers’ and skippers’ written acceptance of it. (Note: If a signed certificate is to carry any weight in any subsequent investigation or claim it is essential that it clearly readable and
understandable in the relatively short period available during the handover process!)
Accident/incident reports and records of any other customer feedback. 11 Statutory Instrument no SI 881/2005. Merchant Shipping (Accident Reporting and Investigation)Regulations 2005 12 IRIS is AINA’s incident and accident recording system which is used to provide the National Water Safety Forum with industry wide data. Hire Boat Code. Issue 1: Technical and Operational Standards Page 29
- 6 Audit
In view of the importance of the handover process, hire operators are strongly recommended to periodically have their handover arrangements independently audited13. Licensing authorities can reserve to right as part of licence conditions to carry out sample audits; having an independent audit available is likely to satisfy such a requirement. 13 The British Marine Federation offer an external audit service. www.britishmarine.co.uk Details of the service are also given at references 12, 13 and 14. Hire Boat Code. Issue 1: Technical and Operational Standards Page 30
Annex G BSS Examination Record Form – Hire Boats template - Edition 0.2 - 19 May 2017 (Interim) (the version of the form extant at the time of the BSS Examination on Diamond Emblem 1 in December 2017)
BSS Examination Record Form – Hire Boats – Boat details and hire operator contact information (Page 1) BSS Examination Record Form Hire Boats (ECP Parts 2 to Part 10) Edition 0.3 – 13 Mar 2018 (Interim)
Section 1 – Boat details and hire operator contact information Boat details (this information must be obtained for recording the examination/s on Salesforce) Current boat name
Make
Former name
Year of manufacture
Reg. number or index
CIN/HIN/WIN
Length (m)
Beam (m)
Max. Crew Number
Engine fuel
Hull material
Engine type
Hull colour
Engine make & model
Superstructure material Number of engines
Superstructure colour
Engine Rating
Additional boat information (this information must be obtained for recording the examination/s on Salesforce) Diesel fuel and/or system
Solid fuel appliance and/or propulsion burner
Petrol fuel and/or system
Portable generator
Paraffin or other fuel oil and/or system
Portable LPG canister(s) and/or appliance
Electrical DC power
Installed LPG system
Electrical AC power
Manometer (M); bubble (B); not-tested (NT):
Previous examination information (optional - for personal records only) Previous BSSC Ref
Date of expiry
Hire operator contact information (optional - for personal records only) Company
Postal address Contact name
Mobile phone number
Other phone number
Boat location information (optional - for personal records only) Location
Special access information Berth number
Telephone number
BSS Examination Record Form – Hire Boats - Checklist (Page 1 of 10)
v0.3 13 Mar 18 Interim Section 2 – Checklist for Hire Boats (Examiners must complete a checklist for all examinations) Examination One (E1)
Examination Two (E2)
Date :
Terminated early: Y / N Date:
Terminated early: Y / N
= BSS Warning Notice must be issued if fault is recorded = BSS Warning Notice may need to be issued
= BSS carbon monoxide leaflet must be issued if fault is recorded Mark E1 / E2 as appropriate: P= pass / F= fault / NV= not verified / NR= not relevant Part 2 Permanently installed fuel systems and fixed engines E1 E2 2.1 Fuel filling points
- 1.1R
Does the location and condition of the fuel filling point ensure that any fuel overflow is prevented from entering the interior of the vessel?
- 1.2R
Is the fuel in use correctly and clearly marked on, or adjacent to, the fuel filling point?
- 1.3R
Are all disused fuel filling points disabled?
- 1.4R
Is the internal diameter of the fuel filling point at least 31.5mm (1¼in)?
- 2
Fuel filling lines
- 2.1R
Are the fuel filling line connections free of signs of leaks and in good condition, and are all fuel filling hose connections accessible for inspection?
- 2.2R
Is the fuel filling line self-draining so that fuel is not retained and is it free of kinks or other restrictions?
- 2.3R
Is the material of the fuel filling line suitable and in good condition?
- 3
Fuel tank vents
- 3.1R
Does every fuel tank have a vent facility?
- 3.2R
Does the fuel tank vent line have a minimum internal diameter of 9.5mm (⅜in)?
- 3.3R
Are the fuel tank vent line connections free of signs of leaks and in good condition, and are all vent hose connections accessible for inspection?
- 3.4R
Is the fuel tank vent line self-draining so that fuel is not retained, and is it free of kinks or other restrictions?
- 3.5R
Is the material of the fuel tank vent line suitable and in good condition?
- 4
Fuel tank vent outlets
- 4.1R
Does the fuel tank vent outlet, or the vent line swan neck, rise at least as high as the filling point?
- 4.2R
Is the fuel tank vent outlet fitted with an effective flame arrester or flame-arresting gauze?
- 4.3R
Is the fuel tank vent outlet in a position where no danger will be incurred from leaking fuel or escaping vapour?
- 5
Fuel tank design and condition
- 5.1R
Are the fuel tanks secure?
- 5.2R
Are fuel tanks made of suitable materials?
- 5.3R
Are fuel tanks, including seams and openings, in good condition and free of signs of leaks?
- 5.4R
Are fuel tanks within engine spaces suitably fire resistant or otherwise protected against the effects of fire?
- 5.5R
Are petrol tanks installed at the required distances from heat sources or protected by a heat baffle?
Notes
BSS Examination Record Form – Hire Boats - Checklist (Page 2 of 10)
v0.3 13 Mar 18 Interim 2.6 Fuel gauges
- 6.1R
Are any glass, or plastic tube, or strip-type fuel gauges fitted to diesel tanks only?
- 6.2R
Are any glass, or plastic tube, or strip-type fuel gauges protected against damage and by self- closing valves?
- 6.3R
Are all fuel gauges and level-indicators in good condition and free of signs of leaks?
- 6.4R
Are fuel tank openings for dipsticks closed by a fuel-tight cap or fitting?
- 7
Petrol fuel system electrical bonding
- 7.1R
Are all metallic components in the petrol filling and tank system electrically bonded to earth?
- 7.2R
Are all parts of electrical bonding systems in good condition?
- 8
Fuel tank connections
- 8.1R
Is the fuel tank drain fitted with a plug or cap which can only be removed with tools?
- 8.2R
Are the petrol feed and return (if fitted) line connections in lift-pump systems made to the top of the tank?
- 8.3R
Is the petrol feed line on a gravity system fitted with a cock or valve directly attached to the tank?
- 8.4R
Are tank connections and tank valves accessible for inspection, in good condition and free of signs of leaks?
- 9
Fuel tank balance lines
- 9.1R
Are multiple petrol tank systems free of balance lines?
- 9.2R
Are balance lines on diesel tank systems made of suitable materials and are they in good condition and free of signs of leaks?
- 10
Fuel feed return and on-engine lines
- 10.1R Are all fuel feed, return and on-engine pipes made of suitable materials?
- 10.2R Are all fuel feed, return and on-engine hoses suitable for the fuel used and fire resistant?
- 10.3R Are all feed, return and on-engine pipes secure and in good condition?
- 10.4R Are all fuel feed, return and on-engine hoses properly supported and in good condition?
- 10.5R Do the injector leak-off (spill rail) arrangements meet specified requirements?
- 11
Fuel feed return and on-engine fuel line connections
- 11.1R Are all fuel line connections of the correct type and free of signs of leaks?
- 11.2R Are all fuel line connections, cocks, valves fittings and other components secure?
- 11.3R Are fuel hose connections made with hose clips or clamps effective and in good condition?
- 12
Fuel filters
- 12.1R Are fuel filters in good condition?
- 12.2R Are all fuel filters inside engine spaces fire resistant?
Notes
BSS Examination Record Form – Hire Boats - Checklist (Page 3 of 10)
v0.3 13 Mar 18 Interim
- 13
Fuel shut-offs
- 13.1R Is an emergency fuel shut-off installed in every fuel feed line?
- 13.2R Are all fuel shut-off valves or cocks, or their means of operation, in a readily accessible position?
- 13.3R Are all fuel shut-off valves or cocks, or their means of operation, in open view or their location
clearly marked?
- 13.4R Are petrol gravity-fed fuel lines provided with the required fuel shut-off facilities?
- 14
Carburettors
- 14.1R Are all non-down-draught carburettors fitted with a drip tray?
- 14.2R Is the carburettor drip tray in good condition, free of signs of leaks, and easily emptied?
- 14.3R Is the carburettor drip tray fitted with effective flame arresting gauze permanently attached along
all edges?
- 14.4R Is a petrol, petroil, or paraffin engine fitted with flame trap or air filter?
- 15
Engine installation
- 15.1R Are all parts of engine mounting systems secure and in good condition?
- 15.2R Are the structures and surfaces surrounding exhaust system components free of signs of heat
damage?
- 15.3R Are all fuel system components in fixed inboard engine spaces permanently installed?
- 16
Steam engines
- 16.1R Is the steam engine pressure system supported by an inspection certificate issued by a competent
person?
- 16.2R Is the steam engine boiler fuel supply system compliant with the applicable BSS requirements?
- 17
LPG engines
- 17.1R Are fuel supply arrangements to LPG-fuelled propulsion engines compliant with UKLPG CoP 18, or
an equivalent standard, and are any dual-fuel petrol/LPG arrangements of an acceptable type?
Part 3 Electrical systems E1 E2 3.1 Battery storage
- 1.1R
Are all unsealed or open-vented batteries ventilated to prevent risk of explosion through hydrogen accumulation?
- 1.2R
Are batteries secure against excessive movement in any direction?
- 1.3R
Are battery terminals correctly insulated or protected?
- 1.4R
Are batteries installed away from metallic petrol and LPG system components?
- 2
Cable specifications and condition
- 2.1R
Are all electrical cables insulated?
- 2.2R
Are battery cables of a sufficient current-carrying capacity?
- 2.3R
Are all cables free of damage or deterioration?
- 3
Cable location
- 3.1R
Are all electrical cables supported in a safe position?
- 3.2R
Are all cables clear of LPG and fuel supply lines?
- 3.3R
Are all electrical cable connections above bilge water level or suitably protected?
- 3.4R
Are spark plug leads free of damage or deterioration and properly supported?
Notes
BSS Examination Record Form – Hire Boats - Checklist (Page 4 of 10)
v0.3 13 Mar 18 Interim 3.4 Cable connections
- 4.1R
Are all battery cable connections effective and in good condition?
- 4.2R
Are all electrical circuit cable connections effective and in good condition?
- 5
Fuses and circuit breakers
- 5.1R
Are all a.c. and d.c. fuses and miniature circuit-breakers appropriately rated, complete and in good condition?
- 5.2R
Are all fuse panels, boxes, holders and consumer units complete and in good condition?
- 6
Battery isolators
- 6.1R
Are battery isolators fitted and are they as close as practicable to the battery?
- 6.2R
Do all electrical circuits pass through a battery isolator, or are those requiring a continuous supply otherwise protected?
- 6.3R
Are battery isolators, or the means to operate them, in readily accessible positions?
- 6.4R
Are battery isolators and connections complete and in good condition?
- 6.5R
Is the location of all battery isolators, or the means to operate them, in open view, or their location clearly marked?
- 7
Two-wire systems
- 7.1R
Is the electrical system insulated from the hull?
- 7.2R
Is a low resistance return cable provided from the engine or starter motor to the battery?
- 8
Shore-power and other alternating current (a.c.) electrical inlet and lead connections
- 8.1R
Are all a.c. shore-power and battery charging lead inlet connections of the correct type in good condition, and suitably protected from the weather?
- 8.2R
Are all shore-power, battery charging, and other a.c. power source lead connections of a suitable type?
- 8.3R
Are all shore-power, battery charging, and other a.c. power source leads and connectors in good condition?
- 9
Alternating current systems – multiple power sources and consumer units
- 9.1R
Is it impossible to connect simultaneously more than one power source to the alternating current distribution system?
- 9.2R
Do all a.c. electrical circuits pass through a consumer unit?
Part 4 Electrical propulsion systems E1 E2 4.1 4.1 Electrically propelled boats
- 1.1R
Is the electrical-propulsion supply system compliant with Part 3 as applicable?
- 2
Electrical propulsion motor and controller
- 2.1R
Are all parts of the electric-propulsion motor mounting systems secure and in good condition?
- 2.2R
Is the motor and controller equipment adequately ventilated and in good condition?
- 3
Battery charging equipment
- 3.1R
Is the battery charging equipment ventilated, complete and in good condition?
Notes
BSS Examination Record Form – Hire Boats - Checklist (Page 5 of 10)
v0.3 13 Mar 18 Interim Part 5 Outboard and portable combustion engines and portable fuel systems E1 E2 5.1 Portable fuel systems
- 1.1R
Do permanently installed fuel systems supplying outboard and portable combustion engines comply with the applicable BSS requirements for the fuel supply system?
- 1.2R
Are all components of portable fuel systems of suitable proprietary manufacture?
- 1.3R
Are all components of portable fuel systems complete and in good condition?
- 1.4R
Are portable fuel systems fitted with a means of shutting off the fuel supply?
- 2
Portable petrol tanks
- 2.1R
Does the maximum capacity of individual portable petrol tanks permit safe and convenient carrying and removal for refilling outside the vessel?
- 2.2R
Are all portable petrol tanks stored, when not in use, to ensure that any leaking fuel or escaping vapour will not enter the interior of the vessel?
- 3
Spare fuel containers
- 3.1R
Are all spare petrol containers stored to ensure that any leaking fuel or escaping vapour will not enter the interior of the vessel?
- 3.2R
Are all spare petrol containers suitable for the purpose and limited to the permitted volume?
- 3.3R
Are all spare fuel containers in good condition?
- 4
Outboard and portable combustion engines
- 4.1R
Are all outboard and portable combustion engines free of fuel leaks?
- 4.2R
Are all outboard and portable combustion engines with integral petrol or LPG tanks stored to ensure that leaking fuel or escaping vapour will not enter the interior of the vessel?
- 4.3R
Are outboard engine mounting systems in good condition?
- 5
LPG-fuelled outboard propulsion engines
- 5.1R
Do the fuel supply arrangements to LPG-fuelled outboard engines comply with UKLPG CoP 18 or equivalent standard and are any dual-fuel petrol/LPG arrangements of an acceptable type?
Part 6 Fire Extinguishing and Escape E1 E2 6.1 Portable fire extinguishers
- 1.1R
Are the correct number of portable fire extinguishers provided, and do they have the correct fire ratings?
- 1.2R
Is the performance of all the portable fire extinguishers properly certificated?
- 1.3R
Are all portable fire extinguishers in good condition?
- 1.4R
Are portable fire extinguishers distributed around the vessel in readily accessible and safe locations adjacent to escape routes?
- 1.5R
Are all portable fire extinguishers in open view, or their location clearly marked?
- 2
Fire blankets
- 2.1R
If the vessel has permanent cooking facilities, is a fire blanket of the correct specification provided?
- 2.2R
Is the fire blanket located close to the main cooking appliance in a safe and ready-to-use location?
- 3
Emergency escape
- 3.1R
Is the vessel provided with adequate means of escape?
Notes
BSS Examination Record Form – Hire Boats - Checklist (Page 6 of 10)
v0.3 13 Mar 18 Interim Part 7 Liquefied Petroleum Gas (LPG) systems E1 E2 7.1 LPG cylinder storage
- 1.1R
Are all LPG cylinders and containers stored in a position where any leakage will be directed safely overboard?
- 1.2R
Are all self-contained portable LPG appliances stored so that any LPG leakage will be directed safely overboard?
- 2
LPG cylinder locker and housing LPG-tightness
- 2.1R
Is the cylinder locker, up to the level of the top of the cylinder valves or other high-pressure components, free of any path for leaked LPG to enter the interior of the vessel?
- 2.2R
Are the sealing arrangements on pipework exiting the cylinder locker of the correct type to ensure LPG-tightness and in good condition?
- 2.3R
Are arrangements on side-opening cylinder lockers compliant with ISO 10239?
- 2.4R
Do the arrangements in a self-draining cockpit prevent LPG entering the interior of the vessel?
- 3
LPG cylinder locker drains
- 3.1R
Is there a drain in the cylinder locker and is the drain outlet above the waterline?
- 3.2R
Is the drain opening at or close to the bottom of the cylinder locker or is any volume beneath the drain opening minimised by the use of suitable material?
- 3.3R
Is the cylinder locker clear of any items that could block the drain?
- 3.4R
Does the drain line fall continuously from the cylinder locker to the drain outlet and are both ends clear of blockage?
- 3.5R
Is the drain line material, including the connections, in good condition?
- 3.6R
Does the drain line, or the drain opening, have a minimum appropriate internal diameter or equivalent area?
- 4
Protecting LPG cylinders and components against damage
- 4.1R
Are all cylinders secured and stored upright with the valve at the top?
- 4.2R
Is the cylinder locker secure?
- 4.3R
Are LPG cylinders in a locker protected against falling objects?
- 4.4R
Is the cylinder locker clear of any items that could damage the LPG equipment or ignite leaked LPG?
- 4.5R
Is the cylinder locker constructed of material of the required thickness?
- 5
Cylinder locker openings
- 5.1R
Are all openings to cylinder lockers outside of any engine, battery or electrical equipment space?
- 6
LPG system shut-off valves
- 6.1R
Are all LPG system shut-off valves, or their means of operation, in a readily accessible position?
- 6.2R
Are the locations of all LPG system shut-off valves, or their means of operation, in open view, or their locations clearly marked?
Notes
BSS Examination Record Form – Hire Boats - Checklist (Page 7 of 10)
v0.3 13 Mar 18 Interim
- 7
LPG high-pressure system components
- 7.1R
Are all high-pressure LPG system components either inside a cylinder locker or in an open location?
- 7.2R
Where two or more cylinders are connected on the high-pressure side, does each connection have a non-return valve fitted?
- 7.3R
Are all hoses on the high-pressure side of pre-assembled lengths not exceeding 1m and to the correct specification?
- 7.4R
Are all high-pressure LPG system components secure and in good condition?
- 7.5R
Are non-cylinder mounted regulators located to prevent damage?
- 7.6R
Is the installation free of manually-adjustable regulators?
- 8
LPG pipework, joints and connections
- 8.1R
Is the LPG pipework made of a suitable material, adequately secured and free from damage?
- 8.2R
Is the LPG pipe protected where it passes through metal bulkheads or decks?
- 8.3R
Are all LPG pipe joints accessible for inspection and of the correct type?
- 8.4R
Are all LPG pipe joints secure, in good condition and competently made?
- 8.5R
Are all unused appliance spurs properly capped or plugged?
- 8.6R
Are all LPG pipes running through petrol engine spaces or electrical equipment spaces jointless and in a gas-proof conduit?
- 8.7R
Is the LPG pipe at least 75mm from exhaust system and flue components?
- 9
Low-pressure LPG hoses and hose connections
- 9.1R
Are all low pressure LPG hoses accessible for inspection, of the correct material and in good condition?
- 9.2R
Is all low pressure LPG hose protected against damage where it passes through bulkheads, decks or partitions?
- 9.3R
Is all low pressure LPG hose at least 75mm from exhaust system and flue components?
- 9.4R
Are all low pressure LPG hoses used to connect regulators or appliances to LPG supply pipework only, and are they a maximum of 1m in length?
- 9.5R
Are all low pressure LPG hose connections accessible for inspection, of the correct type, secure and in good condition?
- 9.6R
Do ‘all-hose’ systems comply fully with ISO 10239?
- 10
Portable appliance connections
- 10.1R
Are all portable appliance connection points provided with an isolation valve?
- 10.2R
Are portable appliance hoses connected with bayonet, plug or screwed fittings, complete and in good condition?
- 10.3R
Are all unused screwed portable appliance connection points properly capped or plugged?
Notes
BSS Examination Record Form – Hire Boats - Checklist (Page 8 of 10)
v0.3 13 Mar 18 Interim 7.11 Appliance isolation valves
- 11.1R Can all appliance supply hoses be isolated through individual shut-off valves?
- 11.2R Are appliance isolation valves of the correct type?
- 11.3R Are appliance isolation valves, or the means of operating them, readily accessible?
- 12
Testing for LPG system tightness
- 12.1R Is there a LPG test point in the system, or a bubble tester in the cylinder locker or housing?
- 12.2R Is the LPG system free of leaks as defined in the tightness test?
Part 8 Appliances and flues E1 E2 8.1 Appliance fuel and power supply
- 1.1R
Do the fuel supply arrangements to all installed appliances meet the applicable BSS requirements?
- 1.2R
Are all liquid-fuelled appliances fitted with shut-off valves, and are the valves or their means of operation, in a readily accessible and safe position?
- 2
LPG or paraffin refrigerators on vessels with petrol propulsion engines
- 2.1R
Where the vessel has a petrol propulsion engine, is the burner of a LPG or paraffin refrigerator room-sealed, or completely enclosed?
- 2.2R
On vessels with petrol propulsion engines that have non-room-sealed fridges with enclosed burners, is the combustion air drawn and exhausted through a suitable effective flame trap, or piped to the appliance as required?
- 3
Installation of appliances in petrol engine spaces
- 3.1R
Are petrol-engine spaces free of LPG and/or liquid-fuelled appliances?
- 4
Protection against fire risks from appliance installations
- 4.1R
Are appliances and surrounding surfaces clear of signs of heat damage and leaking fuel?
- 4.2R
Are all curtains, blinds and other textile materials near to appliances free of heat damage?
- 4.3R
Are non-portable appliances properly secured against accidental or unintended movement?
- 5
Protection against fire risks from appliance flues and exhausts
- 5.1R
Are all vessel structures, equipment, and curtains, blinds and other textile materials near all appliance flues and exhausts free of signs of heat damage?
- 6
LPG catalytic heaters
- 6.1R
Are all LPG catalytic heaters compliant with a suitable manufacturing standard?
- 7
Flame supervision devices
- 7.1R
Are flame supervision devices fitted to all LPG and liquid-fuelled appliances that require them?
- 8
LPG appliance burner operation
- 8.1R
Are all LPG appliance burners in good condition and delivering a proper flame?
Notes
BSS Examination Record Form – Hire Boats - Checklist (Page 9 of 10)
v0.3 13 Mar 18 Interim 8.9 Ventilation
- 9.1R
Is the vessel provided with adequate fixed ventilation?
- 9.2R
Are warning notices displayed on sea-going boats with closable ventilators?
- 10
Appliance flues and exhausts
- 10.1R Are all appliances requiring a flue or exhaust, fitted with one?
- 10.2R Are all appliance flues and exhausts complete and in good condition?
- 10.3R Do all appliance flues and exhausts terminate directly to outside air?
- 10.4R Are all open flues to LPG appliances operating effectively?
- 10.5R Are all solid fuel appliances free of unintended gaps?
Part 9 Pollution prevention E1 E2 9.1 Engine/gearbox oil leak collection
- 1.1R
Will all oil leaks from the engine/s or gearbox/es be collected in an engine tray or oil-tight area?
- 1.2R
Does the bilge pumping system minimise the risk of avoidable pollution?
- 2
Sanitation systems
- 2.1R
Is a closable valve fitted in the discharge line of any toilet appliance or toilet holding tank with overboard discharge?
Part 10 Specific Hire Boat Requirements E1 E2 10.1 Protection from falling overboard
- 1.1R Are all designated external Crew Areas, companionway steps, and boarding planks provided with
suitable slip-resistant surfaces?
- 1.2R Are all designated external Crew Area decks provided with suitable handholds in good condition?
- 1.3R Is the arc of the narrowboat tiller clearly identified?
- 2
Life-saving appliances
- 2.1R Are all lifebuoys in good condition, and is at least one suitable lifebuoy provided and is it
positioned in an appropriate location?
- 3
Means of reversing
- 3.1R Is the boat provided with a means of reversing operable from every helm position?
- 4
Fire-extinguishing & escape
- 4.1R Is the fire blanket fixed permanently in open view?
- 4.2R Are all means of escape, other than main doors, clearly marked with a suitable label in good
condition?
- 5
Ventilation
- 5.1R Are accommodation space fixed ventilators protected by warning labels in open view?
- 6
Glazing materials
- 6.1R Is all glazing material of a suitable type?
Notes
BSS Examination Record Form – Hire Boats - Checklist (Page 10 of 10)
v0.3 13 Mar 18 Interim 10.7 Hull openings
- 7.1R Is the weed hatch opening at least 150mm above the normal laden waterline, and are the cover
securing and sealing arrangements in good condition?
- 7.2R Are all through-hull openings located below the normal laden waterline protected by closable
valves, and are the valves readily accessible and free of signs of leaks?
- 7.3R
Are all through-hull openings above the normal laden waterline either watertight, or is the associated downflooding point the correct height above the normal laden waterline and are any pipes, hoses, ducts or other vessel structures between the hull opening and the downflooding point permanently installed and in good condition?
- 8
Smoke, and carbon monoxide alarms
- 8.1R If the vessel has overnight accommodation, is at least one suitable smoke alarm provided?
- 8.2R Are all smoke alarms in good condition?
- 8.3R If the vessel has overnight accommodation and an installed solid fuel stove, are the correct
number of suitable carbon monoxide alarms provided?
- 8.4R Are all carbon monoxide alarms in good condition?
Notes
BSS Examination Record Form – HBR2017 Appliances, ventilation and portable fire extinguishers
v0.2 19 May Interim Section 3 – Appliances, ventilation and portable fire extinguishers (The following information must be accurate at the time of certification)
Boat name: Certification Date:
- Installed appliances, and the minimum fixed ventilation requirement
Note – A record of all appliances must be made, whether they require fixed ventilation, or not. Appliance type Nos Make & model Flue Fuel kW Ventilation required (mm2) Freestanding cooker U
Separate hob
U
Separate oven/grill
U
Central heating boiler
Instant. water heater
Solid fuel stove
H
Refrigerator
Catalytic heater
U
Max. Crew Number
Total minimum fixed ventilation requirement (mm2) Suggested key for Flue column: U = Un-flued, F = Flued, B = Balanced flued, H= Solid Fuel Stove Suggested key for Fuel column: D = Diesel, G = LPG, S = solid fuel, E = Electric
- Total effective area of fixed ventilation. Hire boats ventilation must be compliant at time of certification
Location of vent Vent type/specification Area per vent (mm2) No. of vents High Level Sub-Total area (mm2) Total effective area of fixed ventilation at high level (mm2)
Location of vent Vent type/specification Area per vent (mm2) No. of vents Low Level Sub-Total area (mm2)
Total effective area of fixed ventilation at low level (mm2) Fixed ventilation requirement ( in mm2 ) = [2200 x U] + [650 x P] + [550 x H] + [440 x F]
Ventilation compliant Yes: No:
- Portable fire extinguisher details
Location Make & model Fire rating Cert. mark
Annex H Broads Authority Hire Boat Operator Licensing Conditions
Broads Authority Hire Boat Operator Licensing Conditions This document sets out the Hire Boat Operator Conditions that need to be satisfied if a licence is to be granted by the Broads Authority. The licence will be issued under Section 94 of the Public Health Acts Amendment Act 1907 and Section 40 of the Broads Authority Act
- Each licence will enable the operator to let for hire, or use for carrying passengers for
hire, the vessels listed in a Schedule. Attention is drawn throughout to the attached hire boat operator notes for guidance. In this Licence the following definitions apply: “the Authority” means the Broads Authority “the Operator” means the person or body named above “the Vessel” means any vessel listed in the Schedule “Skipper” means the person identified at the time of the hire as the person to have command of the Vessel during the period of hire. The Conditions
- (a) Each Vessel is licensed to carry the number of persons indicated against the
Vessel in the Schedule. (b) The number of persons that the Vessel is licensed to carry must be conspicuously displayed on the Vessel using a notice or notices provided by the Authority. (c) A Vessel must not carry any number of persons in excess of that permitted by this Licence.
- The Operator must hold and maintain throughout the period of this Licence
(a) current Public Liability insurance cover with a minimum indemnity of two million pounds. (b) The Operator must, when required by the Authority to do so, make a self- declaration regarding this insurance in relation to any Vessel.
- The Operator must not cause or permit any Vessel to be let for hire in weather
conditions which, at the time of the commencement of the hire, are likely to pose a threat to the safety of those on board the Vessel.
- The Operator must not hire any Vessel which is mechanically powered to any
persons under 16 years of age.
2
- The Operator must not hire any Vessel to any person or persons who are or
appear to be under the influence of alcohol or drugs at the time of the commencement of the hire.
- (a) The Operator must on a regular basis carry out a suitable and sufficient
assessment of the risks associated with the activity of hiring vessels. The frequency of this assessment will depend on the nature of the risk but must be no less frequently than annually. (b) The Operator must promptly act upon the findings of any such assessment where a risk is identified. (c) The Operator must ensure that these assessments are fully documented and readily accessible for inspection by an authorised representative of the Authority.
- The Operator must keep proper records which show:
(a) When any Vessel has been hired out. (b) The number of persons carried and details of the lead member of the party. (c) The expected time of return. (d) The emergency procedures to be implemented on the failure of a Vessel to return.
- The Operator must make available for inspection, to any person authorised by the
Authority for this purpose, any records required by this Licence.
- (a) The Operator must ensure that before using a Vessel the Skipper is given:
(i) An appropriate briefing in accordance with British Marine Federation (BMF)/Association of Inland Navigation Authorities (AINA) /Maritime and Coastguard Agency (MCA) Code for the Design and Construction and Operation of Hire Boats, Part 1, Section 5.2 Handover Procedures (September 2009) (or as subsequently amended). (ii) A proper demonstration on how to fit, wear and use the buoyancy aids or lifejackets provided with the Vessel. (iii) An instruction to advise those on board the Vessel in the use of the buoyancy aids or lifejackets. (b) The Operator must record in writing and retain details of all briefings, demonstrations and instructions given under paragraph 9 (a). (c) The Authority will be entitled to carry out sample audits of the handover arrangements referred to in paragraph 9 (a).
3
- If any changes occur in the ownership or particulars of any Vessel during the term
the Licence, the Operator must give written notice of such change(s) to the Authority within 14 days of the change(s).
- (a) The Operator must report to the Broads Authority, in writing, and as soon as is
reasonably practicable, (and in any case within seventy-two hours of the Operator becoming aware of it), the occurrence of any accident involving the Vessel. (b) For the purposes of paragraph 11(a), an accident means an incident resulting in loss of life, or major injury, or serious damage to property or another vessel, or involves: (i) Explosion (ii) Fire (iii) Capsize of a power-driven craft or boat, or (iv) Pollution causing significant harm to the environment (c) For the purposes of paragraph 11(b) ‘major injury’ means: (i) any fracture, other than to a finger, thumb or toe (ii) any loss of a limb or part of a limb (iii) dislocation of the shoulder, hip, knee or spine (iv) loss of sight, whether temporary or permanent (v) penetrating injury to the eye (vi) any other injury leading to hypothermia or unconsciousness (vii) any other injury requiring resuscitation (viii) any other injury requiring admittance to a hospital or other medical facility as an inpatient for more than 24 hours
- This Licence must not be altered, damaged or defaced in any way.
- This Licence or a true copy of it may be displayed for public view at the premises
from which any Vessel is hired but must be removed from public display in the event that it is suspended, renewed or has expired.
- The Authority may suspend or revoke this Licence in the event of any breach of any
of these conditions if the Authority considers it is necessary or desirable in the interests of the public.
- This Licence must be returned to the Authority within 7 days if:
4 (a) The Operator has ceased the activity for which the Licence has been granted, or (b) The Authority has revoked the Licence.
- This Licence will remain in force, unless previously suspended or revoked, for a
maximum period of one tolls year 1 April – 31 March following year.
- The Licence is personal to the Operator and is not transferable except with the
written permission of the Authority.
- The Authority reserves the right to modify, alter, revoke or add to these conditions,
should it be necessary or desirable in the interests of the public to do so. Such variations will have effect as and when specified by the Authority.
Annex I Broads Authority Annual Audit Reports for Ferry Marina in November 2017 (Operator and Vessel)
Annex J British Marine and VisitEngland Quality Accredited Boatyard (QAB) Standard, v3 March 2022
QAB Quality Accredited Boatyard Standard
QAB Standard v3 March 2022
Introduction
The QAB Standard, developed in conjunction with VisitEngland, provides clear criteria upon which hire boat operations are assessed. Meeting the requirements of the standard leads to VisitEngland QAB accreditation.
The QAB accreditation shows that hire boat operators are committed to quality and provides recognition for their hire boat operations and gives reassurance to hire boat customers.
The Standard’s criteria gives hire boat operators a means of benchmarking and can assist operators to develop their business processes.
The QAB Standard focuses on the systems and procedures hire boat operators carry out in running their hire boat operations, including:
• Health, safety, legal and environment processes. • Hire boat handover processes. • Website and brochure offerings. • Arrival and departure procedures. • Customer service procedures – onshore and when customers are away from the boatyard. • Facilities, for example car parking, reception, toilets, etc.
Applying for QAB Standard accreditation is straight forward – details about this can be found on the British Marine website.
A QAB audit is undertaken at the hire boat operator’s base. A qualified QAB assessor visits and provides an impartial and professional assessment against the requirements and criteria of the standard. Following the site visit, the assessor produces a report providing feedback on the operator’s hire boat processes, whether the operator has attained QAB (met the required criteria) and provides feedback on how the operator’s hire boat operations can be enhanced.
All British Marine members who hire out boats (overnight, or day/ or part of day) are required to attain the QAB Standard.
Once QAB has been achieved, reassessment is undertaken every three years to ensure that hire boat standards and processes are being maintained and meet the requirements of the Standard. Reassessment can be undertaken more frequently if there are significant legal changes that impact on hire boat operations.
Operators meeting the requirement of the QAB Standard receive British Marine/VisitEngland QAB logos and a certificate that can be displayed at their premises and on their website providing real promotional benefits.
QAB Standard v3 March 2022
Further information about the QAB Standard assessment process, the QAB booking process, forms that need to be completed and the associated costs can be found on the British Marine website.
There is an optional Boat Grading Standard that focuses on the quality and condition of individual narrowboats and cruisers offered by hire boat operators and looks at the comfort and ease of use for those hiring them.
Boats assessed are graded between one and five stars.
Having boats graded and advertising these provides customers with clear expectations as to what they can expect on board and can improve the customer experience, which in turn can help hire boat operators achieve success.
Boat grading can only be undertaken if the hire boat operator have a valid QAB accreditation. However, a hire boar operator with QAB accreditation may choose not to have their boats graded, as they might operate their own boat rating scheme. If this is the case the QAB audit will also look at the in-house assessment process to ensure that it is transparent and does not mislead potential customers.
Hire boat operators requesting assessment against the Boat Grading Standard receive an annual visit from an experienced assessor, who will assess the boats against the national boat grading star rating criteria, which is based on the expectations of quality and comfort and standards in the industry.
Following the visit, the assessor provides feedback on how individual boats meet the boat grading criteria and how the quality might be improved upon to enhance customers’ experience and help improve business.
Operators who have their boats graded and awarded star ratings receive British Marine/VisitEngland Boat Grading logos that can be displayed at their premises and on their website and other marketing material.
It is easy to apply for Boat Grading, for instructions on how to apply for Boat Grading and the associated costs please look on the British Marine website.
Completion of forms The relevant forms for both QAB and Boat Grading can be found on the British Marine website, or via contacting qab@britishmarine.co.uk
Costs Current costs for QAB Accreditation and Boat Grading are detailed on the British Marine website www.britishmarine.co.uk
Quality Accredited Boatyard The following outlines the range of information that guides the QAB Standard assessment and accreditation process.
The areas that are looked at as part of the QAB Standard accreditation are show below. These areas are also detailed on the QAB self-assessment form that hire boat operators are required to complete electronically and return to British Marine, prior to the assessor’s visit.
The QAB criteria applies to overnight hire boats, day boats (those with no overnight accommodation) and those powered boats hired out for example during part of a day. Given this, there are certain criteria that may not have relevance those hired out hourly for example.
Overview of the Boatyard
The number of boats available for hire
• overnight • daily • hourly
The range of services provided to hire boat customers, for example:
• Direct boat bookings • Customer arrival and departure services • Car parking facilities • Toilet facilities • Housekeeping services • Emergency and maintenance services on the waterway • Quayside services; fresh water, etc.
The number of staff employed in different areas of the hire boat operation, for example:
• Reception staff • Engineers • Housekeeping • Handover staff
The range of staff training provided, for example:
• Customer service • Accessibility services for customers • Health & Safety • Handover • Boat Maintenance • Emergency Procedures • Other - data protection for example
QAB Standard v3 March 2022
Health, Safety, Legal & Environmental
There are a number health, safety and environmental areas where information is sought and inspected, many of these requirements are set out in the Hire Boat Code, these include:
Do you have a documented Safety Management System in place? Requirement Name of the person who is the Designated Person Requirement Confirmation that a valid company Risk Assessment is in place and that it includes boats Requirement Do you have Risk Assessments in place for all boatyard and hire operations? Requirement Do you have a documented policy on risk assessment review with identified changes in circumstances which would trigger risk review? Requirement Who in the company is responsible for ensuring that all of the certification and licences are in place? Requirement Confirmation that a valid Fire Risk Assessment document is in place Requirement When the servicing of fire extinguishers is carried out and how often Requirement That valid boat licences are held for each hire boat Requirement That a valid boat safety certificate for each hire boat is held Requirement That there are valid Gas Safe certificates held for each hire boat which has gas onboard. Requirement That smoke detector(s) are installed on all boats Requirement That carbon monoxide detector(s) are installed on all boats Requirement Do you have a valid Stability certificate for each boat?
CRT by 1st April 2023 Broads by 1st October for Sailing vessels Requirement That lifejackets / buoyancy aids are provided to customers where there are tunnels on-routes Requirement That lifejackets / buoyancy aids are provided to minors Requirement That lifejackets / buoyancy aids are offered to customers Requirement Documented policy on how the operator ensures that every boat is in a safe condition for each hire Requirement How the operator keeps boat hire customers away from potentially dangerous areas (procedure and practices) Requirement Whether a documented Environmental Policy is in place and how it is adhered to Requirement Whether recycling facilities are provided on site and on board Best Practice
QAB Standard v3 March 2022
Do you have documented emergency procedures for likely incidents? Requirement Do you have a documented procedure for conveying information about navigation restrictions or other hazards to hirers. Requirement Do you have a documented procedure for reporting relevant incidents and accidents to the appropriate authority? Requirement Do you have a documented self audit process? Requirement
QAB Standard v3 March 2022
Company Website and/or Brochure
The information available to customers is important so that they can make informed decisions, having been made aware of all relevant facilities and terms and conditions. Because of this the QAB looks at the information on the hire boat operator’s website and brochure. The following details the type of information examined as part of the QAB audit.
The correct display of logos and awards e.g. VisitEngland, QAB & star ratings, British Marine & British Marine Inland Boating logos Requirement Boat descriptions and any facilities on-board (such as kitchen, sleeping and bathroom arrangements, etc) and how clearly they are explained on the website and in the company’s marketing brochure/other materials Requirement Pictorial/layout plans for each boat are detailed Requirement On-board arrangements and facilities are clearly detailed, for example, pets welcome, provision of buoyancy aids, towels & bedding, TV, etc Requirement Details provided as to the type of electricity supply on the boats Requirement The terms and conditions of business are clearly laid out and easy to understand, for example: • Deposit and payment terms • Cancellation policy • Insurance • Breakage policy • Data protection policy/privacy statement, etc Requirement A clear and unambiguous pricing policy is provided and special offers are clearly detailed Requirement The ease of use of the website search and booking functions Best Practice The ease in which customers can easily contact the hire boat operator with questions Requirement
Process for customers to provide feedback Best Practice A Boaters Handbook/DVD – is made available on the website or provided via alternative means Best Practice Website provision is mobile friendly Best practice If an in-house grading scheme is operated, customers are informed that it is operated in-house and how a grading is achieved Requirement
QAB Standard v3 March 2022
Office and Boatyard Procedures
On-line Booking System The ease by which potential customers/guests can contact the operator with any questions that they may have
Opportunity for potential customers/guests to seek availability and fully complete a booking on-line and also via other means Best Practice Customers/guests are made aware of the Terms & Conditions at the time of the booking, for example: • Deposits • Payment dates • Cancellation Privacy and use of their personal information Requirement That on-line payments are carried out securely Requirement Accessibility Accessible features are detailed in the website or in other promotional material Best Practice Deaf customers, or those with hearing impairment are able to communicate and book either on-line, or via email Best Practice Whether some of the hire boats are more accessible than others and, where this is the case, this is made clear in marketing and booking information Best Practice Staff receive training to assist customers with special needs Requirement Arrival Procedures Information is sent out to customers pre-arrival and what this information comprises (if relevant) Requirement The address of the yard and clear directions to the site are provided to customers/guests Best Practice Public transport links to the yard are provided Best Practice Where on-site car parking provided, this is clearly signposted, the surface is in good order, and it is well lit and secure Best Practice Assistance, or trolleys are provided to assist customers/guest transport luggage to boats Best Practice A standard ‘Welcome’ procedure is followed by staff in addition to Hire Boat Handover Requirement
QAB Standard v3 March 2022
Staff are well-presented and welcoming to customers/guests Requirement An out of hours procedure is in place and implemented Requirement Return Procedure A procedure and guidance is in place detailing the condition customers are expected to leave the boats and this is communicated to staff and customers/guests Requirement Departure times from the boats are clearly detailed and communicated Requirement Recycling facilities are offered and their use encouraged Best Practice Customer Satisfaction Survey / Complaints Procedure Whether a customer satisfaction survey is operated and communicated to customers/guests. This could be company generated or via social media, e.g. trip advisor, etc. Best Practice Whether all customers/guests are invited to provide make comments and feedback Best Practice The ways customers are encouraged to complete survey/feedback forms before they depart Best Practice The hire boat operator acts on any feedback received from customers Best Practice Evidence of any measurable improvement to any aspect of the business, as a result of customer complaints/feedback obtained Best Practice Where boats are let on behalf of third party owners, a written report is provided to the owner in order to provide quality feedback and improvement points Best Practice Whether the complaints procedure is clearly detailed and provided to customers/guests and how this is done (e.g. via the website and/or in written material) Best Practice How the operator deals with complaints if they are raised during the holiday Best Practice How the operator deals with complaints if they are raised following the holiday and departure from the boatyard Best Practice Any complaints received are monitored and analysed in order to identify weaknesses in procedures, or individual boats Requirement Housekeeping How the company ensures a high standard of housekeeping is maintained throughout the fleet
QAB Standard v3 March 2022
How the housekeepers receive training and the type of training Best Practice Supervisory housekeeping staff employed Best Practice Spot checks are undertaken Best Practice The standard of housekeeping is included in the customer satisfaction survey Best Practice Boat Maintenance How the operator ensures that every boat goes out in good working order every time Requirement Whether a maintenance log is kept for each hire boat Requirement Whether worksheets are generated for mechanical and domestic defects and how these are generated Requirement What the servicing regime is Requirement Who is responsible for managing the boat maintenance Requirement Who conducts the boat maintenance Requirement A procedure is in place for responding to boat breakdowns or emergencies on the water Requirement A process is in place for checking for invasive species Best Practice
In-House Boat Assessments (if company policy)
How often each boat is assessed Requirement The criteria used for the assessment Requirement Whether the assessment process takes account of quality as well as facilities Requirement Provision of a clear explanation of the assessment scheme provided for customers Requirement Clear information as to whether an in house assessment is undertaken and detailing that it is not connected to VE or British Marine Requirement
QAB Standard v3 March 2022
Boat Handover
Customer Log & Information
All customer log information is legible Requirement The specific name of the boat being hired is detailed on the hire boat handover document Requirement The date of hire is detailed Requirement The name of booker is detailed (it is also signed and dated) Requirement The name of the skipper is detailed (it is also signed and dated) Requirement The mobile phone number & car registration of hirer’s are detailed Requirement The names of all other persons in party are detailed Requirement Previous experience of those comprising the hiring party is detailed Requirement The number of non-swimmers in the party is detailed Requirement The age of any under 18’s in the party is detailed Requirement Life jackets/buoyancy aids are issued, as appropriate Requirement The route the party plan to take has been recorded Best Practice Name of handover staff is detailed Requirement The time the party arrived is recorded Best Practice The time that the handover started is recorded Requirement The time the handover was completed is recorded Requirement 1 additional crew member has been given emergency operation guidance Requirement
Handover Staff How many staff conduct the handover duties for the operator
The knowledge & experience that the individual handover staff
The training handover staff have received
QAB Standard v3 March 2022
Boat Acceptance Certificate The following information is the minimum requirement Operators may add other relevant information Safety on board • People on deck • Falling overboard • Lifejacket/buoyancy aids • Smoke detectors • Carbon monoxide detectors • Fire extinguishers • Dangers of alcohol and being on and near the water Boat handling • Boat manual • Other waterway users • Steering, stopping and mooring • Route being taken Engine • Maintenance • Controls • Weed hatch instruction/use Appliances on board • Gas • Electric • Toilets • Energy saving Environment • Speed limits • Rubbish/litter/recycling • Reed/shallow water • Single use plastics avoidance during term of hire Contact details • Breakdown • Emergency • Accident
QAB Standard v3 March 2022
Waterways features (where appropriate) • Locks • Fixed and/or swing bridges • Tides Conditions of boats being hired • Return time and state of boat Signatures • Skipper and one other instructed • Hirer • Handover staff
FD06072 | 2022_英国_safety-warning-issued-after-discovery-of-blocked-fixed-co2-fire-extinquishing-system-pilot.pdf
分类:06_境外及港澳台调查报告 | 年份:2022 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
M A R I N E A C C I D E N T I N V E S T I G AT I O N B R A N C H SAFETY BULLETIN SAFETY BULLETIN SB1/2022 MARCH 2022
The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 Regulation 5: “The sole objective of a safety investigation into an accident under these Regulations shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of such an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” Regulation 16(1): “The Chief Inspector may at any time make recommendations as to how future accidents may be prevented.” Press Enquiries: +44 (0)1932 440015 Out of hours: +44 (0)300 7777878 Public Enquiries: +44 (0)300 330 3000 NOTE This bulletin is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2022 See http://www. nationalarchives.gov.uk/doc/ open-government-licence for details. All bulletins can be found on our website: https://www.gov.uk/maib For all enquiries: Email: maib@dft.gov.uk Tel: +44 (0)23 8039 5500 Blockage of fixed CO2 fire extinguishing system pilot hoses identified following a fire on board the roll-on/roll-off cargo ship Finnmaster in Hull, England on 19 September 2021 Section through blocked CO2 pilot hose coupling showing incomplete bore through the stem
MAIB SAFETY BULLETIN 1/2022 This document, containing safety lessons, has been produced for marine safety purposes only, on the basis of information available to date. The Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 provides for the Chief Inspector of Marine Accidents to make recommendations or to issue safety lessons at any time during the course of an investigation if, in his opinion, it is necessary or desirable to do so. The Marine Accident Investigation Branch is carrying out an investigation into the fire on board the roll-on/roll-off cargo ship Finnmaster in Hull, England, on 19 September 2021. The MAIB will publish a full report on completion of the investigation. Captain Andrew Moll Chief Inspector of Marine Accidents NOTE This bulletin is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall not be admissible in any judicial proceedings whose purpose, or one of whose purposes, is to apportion liability or blame. This bulletin is also available on our website: www.gov.uk/maib Press Enquiries: 01932 440015 Out of hours: 0300 7777878 Public Enquiries: 0300 330 3000
1 BACKGROUND On 19 September 2021, a fire broke out in the auxiliary engine room on board the Finland registered roll-on/roll-off cargo ship Finnmaster while departing Hull, England. The crew contained the fire and discharged the machinery space’s carbon dioxide (CO2) fire extinguishing system. Only half of the assigned CO2 cylinders discharged, and the crew had to re-enter the space wearing breathing apparatus to fully extinguish the fire. Finnmaster was operated by Finnlines Oyj (Finnlines) and was equipped with a fixed high- pressure CO2 fire extinguishing system that provided protection for the ship’s machinery spaces, encompassing the main engine room and the auxiliary engine room, and the two cargo holds. The system was designed to be activated remotely via a network of pilot lines and gas activated cylinder valves (Figure 1). INITIAL FINDINGS The initial MAIB investigation identified that one of the auxiliary engine room’s CO2 system pilot hoses was completely blocked. Subsequent examination and testing of Finnmaster’s fixed fire extinguishing systems identified two other hoses on the cargo hold pilot line system that were blocked. Radiographic images taken of the blocked hoses (Figures 2 and 3) showed that the pilot hose couplings had not been fully bored through during the manufacturing process. The testing process also identified several coupling leaks in the pilot lines. In March 2021, the pilot hoses had been replaced during a routine service conducted on board Finnmaster by the marine fire service section of Viking Life-Saving Equipment Oy Finland (Viking). The tests carried out by Viking during the service did not identify any faults with the system. Following the accident, Viking tested the high-pressure CO2 fire extinguishing systems on board the remainder of the Finnlines fleet and identified two similar pilot hoses that were blocked on one of the operator’s ships. All the affected hose assemblies had been supplied to Viking by Geeve Hydraulics B.V. (Geeve), based in the Netherlands. The hose assemblies had been produced under the terms of the classification society type approval held by Geeve. Although the type approval required each completed hose assembly to be pressure tested, there was no specific test that gas could pass freely through the hose assemblies. The hose used in the assemblies was provided in accordance with the type approval held by Geeve. However, Geeve had purchased the couplings from HSR Hydraulics B.V. in the Netherlands, who had sourced the couplings from a different manufacturer. SAFETY ISSUES Safety issues identified during the initial stages of the investigation included:
● The quality assurance processes of the pilot hose assembly supplier did not identify that the hose couplings had not been fully bored through.
● Viking’s onboard installation testing processes did not identify both that some of the hose assemblies were blocked and that there were leaks in the CO2 system pilot lines.
2 Figure 1: Part of the Finnmaster CO2 fire extinguishing system post-accident Open cylinder valve Closed cylinder valve View across CO2 fire extinguishing system cylinders showing pilot hoses, outlet hose and main manifold Inset close-up of open cylinder valve Inset close-up of closed cylinder valve Pilot hoses Outlet hose Main manifold
3 Figure 2: CO2 pilot hose coupling, showing clear passage through the stem Radiographic image of CO2 pilot hose coupling showing coupling, ferrule, stem and reinforced hose, with clear passage through stem Figure 3: CO2 pilot hose coupling, showing incomplete bore through the stem Radiographic image of CO2 pilot hose coupling showing blocked section of stem Coupling Ferrule Reinforced hose Stem Blocked section of stem ACTION TAKEN BY THE MAIB The MAIB has: Contacted the companies identified as having been supplied with the affected hose assemblies to make them aware that these assemblies may be blocked and to recommend that they take immediate remedial action in accordance with recommendation S2022/107M, as detailed below. ACTIONS TAKEN BY OTHER ORGANISATIONS Geeve Hydraulics B.V. has:
● Discontinued the supply of the affected hose assemblies.
● Amended its testing procedure to incorporate a pneumatic flow test of the complete hose assemblies to verify that they are not blocked.
4 Finnlines Oyj has: Issued instructions to its fleet to ensure that crews on board its vessels are fully acquainted with the procedures for the manual activation of CO2 fire extinguishing systems in the event of the pilot actuation system failing. Viking Life-Saving Equipment Oy Finland has: Amended its procedures for the servicing of high-pressure CO2 systems to incorporate a positive test for blockages of the pilot system pipework. It has also issued a health and safety awareness notice highlighting the issues identified. RECOMMENDATIONS Geeve Hydraulics B.V. is recommended to: S2022/105 Provide a copy of this safety bulletin to all customers supplied with hose assemblies fitted with couplings supplied by HSR Hydraulics B.V. that do not meet the required type approval, and draw attention to the safety issues raised and the need for immediate action to identify and rectify any defects found in safety critical systems. S2022/106 Amend its purchasing and quality control procedures to ensure that hose assembly components are procured in accordance with the relevant type approval requirements. All companies identified as having been supplied with the affected hose assemblies by Geeve Hydraulics B.V., with couplings sourced from HSR Hydraulics B.V., are recommended to: S2022/107M Take immediate remedial action to identify and rectify any blocked pilot hose assemblies and pilot system leaks on potentially affected CO2 fire extinguishing systems. REQUEST FOR INFORMATION To assist this investigation, it is requested that service providers, owners and operators pass details of any blocked pilot system hose assemblies that they find to the MAIB. Email maib@dft.gov.uk with the title ‘CO2 Pilot System Hose Assembly Issues’ and include the name of the vessel, the date and place of installation of the affected hose assemblies, and details of the defects identified. This information is for internal use only and will be treated in strict confidence. Issued March 2022 Safety recommendations shall in no case create a presumption of blame or liability
FD06073 | 2022_英国_two-catastrophic-engine-failures-one-resulting-in-a-fire-on-board-ro-ro-passenger-ferry-wight-sky__2022-4-WightSky-Report.pdf.pdf
分类:06_境外及港澳台调查报告 | 年份:2022 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
ACCIDENT REPORT ACCIDENT REPORT Report on the investigation of two catastrophic engine failures, one resulting in a fire, on board the ro-ro passenger ferry Wight Sky at the entrance to Lymington River and before berthing at Lymington Pier on 26 August and 14 December 2018 SERIOUS MARINE CASUALTY REPORT NO 4/2022 APRIL 2022
The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2022 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. All MAIB publications can be found on our website: www.gov.uk/maib For all enquiries: Marine Accident Investigation Branch First Floor, Spring Place 105 Commercial Road Southampton SO15 1GH United Kingdom Email: maib@dft.gov.uk Telephone: +44 (0)23 8039 5500 Press enquiries during office hours: +44 (0)1932 440015 Press enquiries out of hours: +44 (0)300 7777878
CONTENTS GLOSSARY OF ABBREVIATIONS AND ACRONYMS SYNOPSIS 1 SECTION 1 – FACTUAL INFORMATION 2 1.1 Particulars of Wight Sky and accident 2 1.2 Background 4 1.3 Narrative 4 1.3.1 Number two main engine failure August 2018 4 1.3.2 Number four main engine failure December 2018 7 1.3.3 Post-accident actions 10 1.4 Crew 13 1.4.1 Manning levels 13 1.4.2 Crew on 26 August 2018 13 1.4.3 Crew on 14 December 2018 14 1.5 Wightlink Ltd 14 1.5.1 General 14 1.5.2 The introduction of the Wight Class ferries 14 1.6 Main engines 14 1.6.1 Overview 14 1.6.2 Engine build process 15 1.6.3 Engine maintenance schedules 16 1.7 Wight Class propulsion system 19 1.7.1 Overview 19 1.7.2 Vessel operating profile 21 1.7.3 Fluid coupling power transmission 24 1.8 Engine cooling system 24 1.8.1 Overview 24 1.8.2 Engine coolant 28 1.8.3 Engine cylinder liner failures 29 1.9 Engine lubrication system 30 1.9.1 Overview 30 1.9.2 Oil filters 30 1.9.3 Oil testing 33 1.9.4 Lubricating oil analysis service bulletin 36 1.10 Engine control, monitoring and protection system 38 1.11 Wightlink technical and maintenance management 39 1.11.1 Technical management team 39 1.12 Volvo Penta 39 1.12.1 Volvo Penta dealers 39 1.12.2 Service requests and service bulletins 40 1.13 RK Marine Ltd 40 1.13.1 Overview 40 1.13.2 Maintenance of Wightlink’s D16 MH engines 40 1.13.3 Operational guidance 41 1.13.4 Application of service bulletins 41 1.13.5 Quality management system audits 42
- 14 Examination of the failed engines
43 1.14.1 Overview 43 1.14.2 Wight Sky main engine number two failure 12 September 2017 (Event 1) 43 1.14.3 Wight Light main engine number one main bearing seizure 2 February 2018 (Event 2) 44 1.14.4 Wight Light main engine number two melted piston and partial seizure 3 August 2018 (Event 3) 44 1.14.5 Wight Sky main engine number two catastrophic failure 26 August 2018 (Event 4) 47 1.14.6 Wight Sky main engine number four catastrophic failure 14 December 2018 (Event 5) 51 1.15 Other tests and examinations 51 1.15.1 Engine alignment and vibration analysis 51 1.15.2 Flexible mounts and testing 52 1.15.3 Subsequent planned maintenance engine examinations 52 1.16 Classification society oversight 54 1.17 Safety management 57 1.17.1 Company meetings 58 1.18 Previous accidents 58 1.18.1 Windcat 8 – catastrophic engine failure 58 1.18.2 St Helen – mezzanine deck collapse 58 SECTION 2 – ANALYSIS 60 2.1 Aim 60 2.2 Overview 60 2.3 Wight Sky catastrophic engine failures 60 2.3.1 Number two main engine failure August 2018 (Event 4) 60 2.3.2 Number four main engine failure December 2018 (Event 5) 61 2.4 Other Wight Class engine failures 62 2.4.1 General failure rate 62 2.4.2 Wight Light number one main engine failure February 2018 (Event 2) 62 2.4.3 Wight Light number two main engine failure August 2018 (Event 3) 63 2.5 Management of maintenance 63 2.5.1 Wightlink maintenance management system 63 2.5.2 Service bulletins 64 2.5.3 Through-life maintenance support 65 2.5.4 Safety management system non-conformities 65 2.6 Engine condition monitoring 66 2.6.1 Engine performance diagnostics 66 2.6.2 Lubricating oil quality and testing 66 2.6.3 Engine coolant 67 2.7 Maintenance standards and quality control 68 2.7.1 General maintenance standards 68 2.7.2 Assembly errors 68 2.7.3 Debris in the rotating assembly 68 2.7.4 Engine alignment and vibration 69 2.7.5 Reuse of engine components and unauthorised repairs 69 2.7.6 Quality management 70 2.8 Engine control, monitoring and protection system 70 2.9 Cooling water system and liner failures 71 2.10 Lubricating oil filter design 72 2.11 Ferry operating profile 72 2.12 Classification society oversight 72 2.13 Emergency response 73
SECTION 3 – CONCLUSIONS 74 3.1 Safety issues directly contributing to the accidents that have been addressed or resulted in recommendations 74 3.2 Safety issues not directly contributing to the accidents that have been addressed or resulted in recommendations 75 SECTION 4 – ACTION TAKEN 77 4.1 MAIB actions 77 4.2 Actions taken by other organisations 77 SECTION 5 – RECOMMENDATIONS 80 FIGURES Figure 1: Lymington to Yarmouth route Figure 2: Layout of machinery spaces Figure 3: Engine room CCTV of ME2 engine fire Figure 4: Hole in ME2 crankcase, showing number four crankpin journal, and inset, showing number four connecting rod on the engine room deck plate Figure 5: ME4 number four connecting rod and gudgeon pin Figure 6: Hole in ME4 crankcase/engine block, showing number four crankpin journal Figure 7: D16 MH engine connecting rod installation Figure 8: D16 MH bearing cap and connecting rod serial numbers Figure 9: Schematic of rotating assembly Figure 10: Transfluid KPTO drain-type fluid coupling Figure 11: Propulsion system layout Figure 12: Rexnord Omega elastomeric close-coupled E100 coupling Figure 13: Flexible engine mounts Figure 14: Engine cooling system Figure 15: Coolant system T-piece Figure 16: Modified cooling system high temperature circuit pipework Figure 17: Engine lubricating oil system Figure 18: Engine block lubricating oil galleries Figure 19: D16 MH lubricating oil filters (with changeover cock)
Figure 20: Replacement lubricating oil filters without changeover cock Figure 21: Event 1 – engine block re-examination Figure 22: Event 2 – main journal bearing cap number seven Figure 23: Event 3 – number six cylinder scoring and melted piston crown Figure 24: Event 4 – carbon deposits on cylinder head valves Figure 25: Event 4 – heat damage to number four crankpin journal Figure 26: Event 4 – scoring of main journal bearing shells Figure 27: Event 4 – graphitisation marks on number four cylinder liner Figure 28: Engine flexible mount rubber bush misalignment Figure 29: Debris found in engine sump pan and lubricating oil strainer Figure 30: Erosion to engine block in line with and below the upper of the two lower cylinder liner seals Figure 31: Cavitation erosion of high temperature cooling water pump Figure 32: Corrosion in upper cylinder head from air pocket
TABLES Table 1: Wight Sky main engine failures Table 2: Wight Light main engine failures Table 3: Wight Sun main engine failures Table 4: Engine failure - Events 1 to 5 Table 5: Volvo Penta D16 MH service protocol Table 6: Oil analysis parameter limits ANNEXES Annex A: Wightlink Ltd - Lymington Harbour Safe Operating Procedure Annex B: Cylinder Liner Cavitation Erosion On Diesel Engines Annex C: Event 1: number 6 connecting rod debris analysis
GLOSSARY OF ABBREVIATIONS AND ACRONYMS °C
degrees centigrade °dH
deutsche Härte, a German measurement of general water hardness, where 1°dH is equal to 17.848 mg/l calcium carbonate µm
micron ARGUS
Volvo Penta dealers’ internal reporting system Bar
metric unit of pressure (1bar = 100kPa) CCTV
closed-circuit television cSt
centistoke DPA
Designated Person Ashore ECU
engine control unit EU
European Union FRS
Fire and Rescue Service HT
high temperature ISM Code
International Safety Management Code ISO
International Organization for Standardization KPa
kilopascals kW
kilowatt kts
knots LR
Lloyd’s Register LT
low temperature m
metre MCA
Maritime and Coastguard Agency MCU
marine control unit ME
main engine mg/L
milligrams per litre MMR
machinery monitoring room nm
nautical miles OBS
observation pH
A scale used to specify how acid or alkaline a water-based solution is ppm
parts per million RKM
RK Marine Ltd
ro-ro
roll-on/roll-off rpm
revolutions per minute SCA
supplemental coolant additive SEM
scanning electron microscope
STCW
International Convention on Standards of Training, Certification and Watchkeeping for Seafarers 1978, as amended SMS
safety management system TBN
Total Base Number TTH
The Test House UTC
universal time coordinated VSP
Voith Schneider Propeller Wightlink
Wightlink Ltd W-Class
Wight Class TIMES: all times used in this report are UTC unless otherwise stated.
Wight Sky Image courtesy of Geni by permission of CC BY-SA 4.0 (https://commons.wikimedia.org/w/index.php?curid=47612090) Roll-on/roll-off passenger ferry Wight Sky at sea
1 SYNOPSIS At 1835 on 26 August 2018, the roll-on/roll-off passenger ferry Wight Sky suffered a catastrophic main engine failure as it prepared to enter the Lymington River on its regular crossing from Yarmouth, Isle of Wight. This was the ferry’s second catastrophic main engine failure in less than a year, the failed engine being the replacement for a previous catastrophic engine failure that had resulted in a fire and serious injuries to an engineer officer. On 14 December 2018, Wight Sky suffered a third catastrophic main engine failure. On this occasion, the failed engine had been in operation for just 389 hours. Wight Sky was one of three sister ferries operating between Lymington and Yarmouth. Following the third engine failure the ferry owner, Wightlink Ltd, withdrew its Wight Class ferries from service. After discussions between the ferry owner, the Maritime and Coastguard Agency, Lloyd’s Register, and the engine manufacturer Volvo Penta, a mitigation plan was put in place to enable the ferries to return to service. The initial mitigation measures included weather and engine load constraints, enhanced engine monitoring and shutdown procedures, and restrictions on personnel entering the engine rooms when the main engines were running. This investigation found a history of engine failures across the Wight Class fleet while operating on the route, dating back to 2010. As a consequence, the scope of the investigation expanded to include all known failures, leading to a long and detailed technical investigation that comprised forensic examination and testing of five of the failed engines and their components, a full review of the vessels’ system design and operation, and the safety management, planned maintenance and condition monitoring procedures, together with manning and technical oversight. In May 2019, the MAIB published an interim report of its initial findings. Although Wight Sky’s catastrophic main engine failures had similar consequences, the complex circumstances that led to them differed. However, many of the underlying factors that contributed to the Wight Sky and other Wight Class engine failures were similar and included insufficient technical oversight of engine operating parameters, maintenance management, quality control and engine component and auxiliary system design. This was exacerbated by a lack of engine maintenance and condition monitoring ownership, which resulted in long-standing reliability issues that were either unidentified or unresolved. Wightlink Ltd and other stakeholders have taken several actions following their internal investigations and in response to recommendations made in previous MAIB reports. Since December 2018, the ferries have successfully operated without any catastrophic engine failures. RK Marine Ltd, the local service centre contracted to undertake most of the Wight Class ferry engine overhauls, has had its authorisation as a Volvo Penta Centre dealer removed by the engine manufacturer. Recommendations aimed at addressing specific issues that remain unresolved by the actions already taken have been made to Wightlink Ltd, Volvo Penta, Lloyd’s Register and RK Marine Ltd.
2 SECTION 1 – FACTUAL INFORMATION 1.1 PARTICULARS OF WIGHT SKY AND ACCIDENT SHIP PARTICULARS Vessel’s name Wight Sky Flag United Kingdom Classification society Lloyd’s Register IMO number 9446984 Type Roll/on roll/off passenger ferry Registered owner Wightlink Ltd Manager(s) Wightlink Ltd Construction Steel Year of build 2008 Length overall 62.40m Gross tonnage 2546 Minimum safe manning Dependent on passenger numbers Authorised cargo Passengers, private and commercial vehicles VOYAGE PARTICULARS Port of departure Yarmouth (Isle of Wight) Yarmouth (Isle of Wight) Port of arrival Lymington Lymington Type of voyage Internal waters Internal waters Cargo information 117 passengers, 33 vehicles 43 passengers, 17 vehicles Manning 10 9 MARINE CASUALTY INFORMATION Date and time 26 August 2018 at 1841 14 December 2018 at 0655 Type of marine casualty or incident Serious Marine Casualty Serious Marine Casualty Location of incident 50° 44’ 41N 1° 30’ 42W Lymington River entrance 50m from Lymington ferry berth Place on board Forward engine room Aft engine room Injuries/fatalities None None Damage/environmental impact No.2 main engine damaged beyond repair No.4 main engine damaged beyond repair Ship operation In service In service Voyage segment Arrival Arrival External & internal environment Near gale; slight sea; moderate visibility Gentle breeze; calm sea; good visibility Persons on board 127 52
3 Figure 1: Lymington to Yarmouth route Reproduced from Admiralty Chart 2035-0 by permission of HMSO and the UK Hydrographic Office Lymington Yarmouth
4 1.2 BACKGROUND Wight Sky was a UK registered roll-on/roll-off (ro-ro) passenger ferry, owned and managed by Wightlink Ltd (Wightlink). It was one of three Wight Class (W-Class) ferries operated between Lymington, Hampshire and Yarmouth, Isle of Wight (Figure 1). The crossing took about 40 minutes. Wight Sky was a double-ended vessel that could be driven in either direction. It had two engine rooms with identical layouts that were referred to as the forward and aft engine rooms. The ferry had four diesel-driven, variable speed Volvo Penta D16 MH main engines (ME): ME1 and ME2 in the forward engine room, and ME3 and ME4 in the aft engine room (Figure 2). The ferry was propelled and steered by two five-blade Voith Schneider Propeller (VSP) units, one forward and one aft. Depending on the required power, one or two MEs could independently drive each propulsion unit. In addition to the main engines, each engine room contained two electric generators driven by Volvo Penta D9 MG diesel engines. A central auxiliary machinery space contained the engine room water mist fire suppression system (Figure 2). On 12 September 2017, Wight Sky’s ME2 suffered a catastrophic1 failure during the vessel’s approach to Yarmouth, which resulted in an engine room fire and caused serious injuries to an engineer officer. RK Marine Ltd (RKM), a local Volvo Penta dealer, had recently overhauled the engine ashore, after which it was rebuilt in the vessel’s engine room. The engine ran for less than 6 hours before it failed. Volvo Penta’s investigation concluded that a big end bearing’s lubrication supply had probably been blocked by debris that had been allowed to enter the engine’s oil channels during its rebuild. The MAIB’s investigation (MAIB 14/2018)2 concluded that: Rebuilding the engine in a clean and controlled environment and transferring it complete into the engine room would have reduced the likelihood of debris ingress. Subsequently, fully assembled engines were shipped in and out of the W-Class ferries via the designated route. A new-build engine replaced the failed ME2. It was delivered from Volvo Penta’s factory in Sweden and installed by RKM. 1.3 NARRATIVE 1.3.1 Number two main engine failure August 2018 At 1823 on 26 August 2018, Wight Sky left Yarmouth on its regular route across the Solent to Lymington. On board were a range of commercial and private vehicles, 117 passengers and 10 crew. ME1 and ME2 drove the VSP at the bow and ME3 drove the VSP at the stern. All three MEs were operating at their 1800rpm full speed setting. 1 A catastrophic engine failure means a sudden and total failure from which recovery is impossible. 2 https://www.gov.uk/maib-reports/catastrophic-engine-failure-and-fire-on-board-ro-ro-passenger-ferry-wight- sky
5 Figure 2: Layout of machinery spaces Diagram showing VSP units, aft and forward machinery space, auxillary machinery space, propeller shafts, v-belt drive arrangement, ME1, ME2 and hi-fog system Propeller shaft v-belt drive arrangement Propeller shaft Aft machinery space Forward machinery space Auxiliary machinery space Water mist fire supression system ME1 ME2 ME4 ME3 VSP unit VSP unit v-belt drive arrangement
6 As Wight Sky approached the entrance to Lymington River, it waited for the outbound ferry, Wight Light, to clear the river. The bridge team reduced the pitch on the VSPs and used them to hold position and stem the wind and tide. At 1840:52, Wight Sky’s machinery monitoring system identified a loss of ME2 lubricating oil pressure and initiated an engine shutdown. Within 2 seconds, ME2’s low piston cooling oil pressure and shutdown common alarms activated. At 1841:55, the engine failed catastrophically, causing internal engine components to be thrown through the engine crankcase into the engine room. The oil and vapours released from the crankcase into the engine room ignited and created a fireball around the engine (Figure 3) that activated the fire detection system alarm on the bridge. The master looked at the engine room’s closed-circuit television (CCTV) monitor, saw the smoke and fire, took immediate action to ensure the engine had declutched and stopped, and activated the engine room’s water mist fire suppression system, which extinguished the fire. The crew were quickly mustered, the passengers assembled, and the coastguard alerted. The master informed the coastguard that the fire appeared to be out and that his intention was to continue into Lymington under the vessel’s own power. He requested the attendance of the Fire and Rescue Service (FRS). The crew monitored the bulkhead and deck temperatures in the compartments around the forward engine room and rigged hoses for boundary cooling. Figure 3: Engine room CCTV of ME2 engine fire Engine room fire burning and obscuring ME2 engine
7 Shortly after the master made the decision to proceed to Lymington, black smoke began issuing from ME2’s engine room funnel. The chief engineer advised the master to declutch and stop ME1 as a precaution because it was in the same engine room as ME2. The master followed the chief engineer’s advice and decided to abort the entry and return to Yarmouth, where Wight Sky could use its one available VSP to safely berth without assistance. In parallel with ME3, ME4 was started and clutched in and the vessel headed back across the Solent towards Yarmouth. At 1911, Wight Sky was berthed alongside the ferry terminal. The FRS boarded the ferry and the passengers were disembarked via the side door. The vehicles were disembarked once the FRS confirmed it was safe to do so. The initial ME2 inspection identified that the engine’s number four cylinder connecting rod had failed and been ejected through the side of the engine crankcase (Figure 4), and that a localised fire had ensued. The engine had accumulated 2241 running hours since its installation and, as the failure mode appeared identical to the previous ME2 failure, the MAIB began a new investigation. On 22 November 2018, Wight Sky’s ME2 was replaced with a new-build engine. 1.3.2 Number four main engine failure December 2018 At 0535 on 14 December 2018, Wight Sky departed Yarmouth and headed to Lymington. On board were 17 commercial and private vehicles, 43 passengers and 9 crew. ME1 and ME2 drove the VSP at the bow and ME4 drove the VSP at the stern. At 0640, Wight Sky entered Lymington River with all three engines operating at the intermediate speed setting of 1360rpm. At 0655:48, with the ferry about 50m from its berth, an ME4 common alarm3 sounded. The chief engineer, who was in the machinery monitoring room (MMR) on the main deck, acknowledged the alarm and checked the engine’s operating status on the machinery monitoring system. The chief engineer noted that the lubricating oil pressure was lower than expected but was within its alarm limits. At 0657:56, the ME4 sounded a ‘DGU4 MODBUS5’ alarm. The chief engineer did not recognise this alarm, which coincided with the deck crew entering the MMR to report loud banging noises from the aft engine room and observations from the shore that smoke could be seen issuing from the vents. The chief engineer contacted the master on the bridge and advised him to activate the aft engine room’s water mist fire suppression system; this was done at 0658:51. The chief engineer then went to the aft engine room entrance, where he activated the emergency stops for the space’s vent fans and fuel pumps and tripped the aft fuel oil service tank quick closing valves. The master raised the fire alarm and requested FRS attendance on berthing; the passengers were informed of the situation and kept updated. The vessel’s fire party mustered on the main deck and rigged fire hoses for boundary cooling. On his 3 Indicates an active alarm status. 4 Distributed Generic Unit is a module designed to communicate with external equipment on a serial line or CAN for controlling and monitoring different engine applications, i.e. propulsion. 5 MODBUS is a communication protocol where data is transmitted one bit at a time (i.e. 50kbps) providing alarms and system status.
8 Figure 4: Hole in ME2 crankcase, showing number four crankpin journal, and inset, showing number four connecting rod on the engine room deck plateClose-up of number four crankpin journal and hole in engine crankcase Close-up of number four connecting rod covered in oil on engine room deck plate Number four crankpin journal Number four connecting rod Hole in engine crankcase
9 return to the MMR, the chief engineer noted that ME4 was still running and asked the master to declutch and stop the engine from the bridge. He then transferred the electrical load onto the forward diesel generators and shutdown the aft generator. The aft engine room remained sealed and crew monitored its boundary temperatures; the forward fire pump was started in preparation for boundary cooling. A few minutes later, the vessel successfully berthed at Lymington and its passengers and vehicles were quickly disembarked. The FRS boarded and confirmed there was no fire. The initial inspection of the engine room identified that ME4 had failed catastrophically and that its number four connecting rod and gudgeon pin (Figure 5) had been ejected through the side of the engine crankcase (Figure 6) into the engine room. The engine room was unoccupied at the time and there was no evidence of a fire. Figure 5: ME4 number four connecting rod and gudgeon pin Close-up of connecting rod and gudgeon pin on its side Connecting rod Gudgeon pin
10 Figure 6: Hole in ME4 crankcase/engine block, showing number four crankpin journalTorch light shining on hole in engine crankcase and number four crankpin journal Number four crankpin journal Hole in engine crankcase 1.3.3 Post-accident actions Following Wight Sky's ME4 failure, Wightlink immediately withdrew its W-Class vessels from service. After discussions between Wightlink, the Maritime and Coastguard Agency (MCA), the vessels’ classification society Lloyd’s Register (LR), and Volvo Penta, a mitigation plan was introduced that enabled the ferries to return to service. Initial measures included: the introduction of more rigorous weather and engine load constraints; enhanced engine monitoring and shutdown procedures; and restrictions on personnel entering the machinery spaces when the MEs were running. Further precautionary steps were taken as the technical investigation progressed. ME4 was a new-build engine that had accumulated 389 running hours before it failed. As this was Wight Sky’s third catastrophic engine failure in 15 months, and due to the apparent similarities, the MAIB widened the scope of its investigation to include the causes and circumstances of ME4’s failure.
11 In May 2019, MAIB issued an interim report6 on its initial findings and the actions taken by Wightlink, Volvo Penta, RKM, LR, and the MCA. As the investigation progressed, it became apparent that similar and other types of ME failure were more common on the three Lymington to Yarmouth W-Class vessels than initially thought. The failures (Tables 1, 2 and 3) started within two years of the vessels’ 2009 introduction into service. No single causal factor had been identified by Wightlink, RKM, Volvo Penta or LR. As a result, the breadth of this investigation was further expanded to include all known ME failures across the three vessels. Table 1: Wight Sky main engine failures Date Description of main engine failure July 2010 ME1 cylinder liner failure. Erosion at O-ring seal lands at 6027 running hours, resulting in engine rebuild that included new liners. March 2011 ME3 cylinder liner failure. Erosion at O-ring seal lands at 8125 running hours, resulting in engine rebuild that included new liners and bearings. November 2011 ME2 cylinder liner failure. Erosion at O-ring seal lands at 9394 running hours, resulting in engine rebuild that included new liners and bearings. January 2012 ME4 cylinder liner failure. Erosion at O-ring seal lands at 7750 running hours, resulting in engine rebuild that included new liners and bearings. 01 May 2015 ME1 cylinder liner failure. Erosion at O-ring seal lands at 16412 running hours, resulting in engine rebuild that included new liners and bearings. 24 February 2017 ME4 idler gearwheel bearing failure. The engine was rebuilt in situ. July 2017 ME2 coolant loss problem. The turbocharger and exhaust were replaced (without improvement). 04 August 2017 ME2 exhaust issued white smoke on starting. Turbo charger replacement followed by subsequent failure of a number five cylinder exhaust valve at 20907 running hours. Engine rebuild, using previously repaired engine block from Wight Sun ME4 and crankshaft from Wight Light ME1. 12 September 2017 Catastrophic failure of ME2 5.5 running hours after rebuild. The engine was replaced with a factory supplied new build. MAIB Report 14/20187. 26 August 2018 Catastrophic failure of ME2 after 2241 running hours. The engine was replaced with a factory supplied new build. 14 December 2018 ME4 catastrophic failure after 389 running hours. The engine was replaced with a factory supplied new build. 6 Interim report on the investigation into two catastrophic engine failures on board the ro-ro passenger ferry Wight Sky on 26 August 2018 and 14 December 2018. 7 https://www.gov.uk/maib-reports/catastrophic-engine-failure-and-fire-on-board-ro-ro-passenger-ferry-wight- sky
12 Table 2: Wight Light main engine failures Date Description of main engine failure 15 October 2012 ME3 cylinder liner failure. Erosion at O-ring seal lands at 11373 running hours, resulting in engine rebuild that included new liners and bearings. 18 November 2014 ME2 cylinder liner/block failure at 13022 running hours, resulting in engine rebuild that included new engine block, liners, bearings, pistons and fuel injectors. 17 May 2016 ME4 cylinder liner failure. Erosion at O-ring seal lands at 17407 running hours, resulting in engine rebuild including new engine block, crankshaft, 5-off ex-Wight Sun ME3 connecting rods and one new connecting rod, liners and bearings. 20 July 2017 ME1 cylinder liner failure. Erosion at O-ring seal lands and five cracked pistons at unknown running hours. The major overhaul included a previously repaired engine block from Wight Light ME4, crankshaft, connecting rods and liners. 2 February 2018 ME1 crankshaft bearing seizure at 23400 running hours. The engine was replaced with factory supplied new build. March 2018 ME3 seizure approximately 7500 running hours after major overhaul. New engine installed. April 2018 ME4 suffered a bearing failure on the idler gearwheel. The engine was removed ashore for overhaul. 3 August 2018 ME2 suffered melted piston/partial seizure about 8000 hours after major overhaul. The engine was replaced with factory supplied new build. Table 3: Wight Sun main engine failures Date Description of main engine failure 01 October 2012 ME1 cylinder liner failure. Erosion at O-ring seal lands at 14860 running hours, resulting in engine rebuild that included new liners and bearings. April 2013 ME3 clutch coupling failure at 8800 running hours, resulting in engine rebuild that included new liners and bearings. 03 March 2014 ME2 cylinder liner failure. Erosion at O-ring seal lands at 8200 running hours, resulting in engine rebuild that included new liners and bearings. 01 July 2015 ME2 cylinder liner failure. Erosion at O-ring seal lands at 12791 running hours, resulting in a new engine block, liners and bearings. November 2015 ME3 suffered number 3 big end bearing seizure and crankcase explosion at 13295 running hours, resulting in engine rebuild with replacement short block. March 2016 ME4 suffered a seizure due to rotation of a main bearing, resulting in engine rebuild. 06 July 2017 ME4 lubricating oil pressure failure, resulting in bearing shell rotation at unknown running hours. Engine rebuild with replacement short block from unknown spare engine.
13 Two of the Wight Light failures were investigated in greater detail and included in the scope of the technical investigation. The failure events shown in bold in Table 1 and Table 2 were numbered as Events 1 to 5 (Table 4). Table 4: Engine failure - Events 1 to 5 Event number Vessel/Main engine number Date Description of failure Event 1 Wight Sky ME2 12 September 2017 Catastrophic failure Event 2 Wight Light ME1 2 February 2018 Main bearing seizure Event 3 Wight Light ME2 3 August 2018 Melted piston and partial seizure Event 4 Wight Sky ME2 26 August 2018 Catastrophic failure Event 5 Wight Sky ME4 14 December 2018 Catastrophic failure 1.4 CREW 1.4.1 Manning levels The manning levels on board Wightlink’s ferries varied according to the numbers of passengers carried. The company used a modal manning system designed to meet or exceed the MCA’s minimum manning requirements based on passenger demand. Wightlink’s Lymington-based crew members worked to a roster system; they were not appointed to a particular vessel but typically spent four concurrent days on one of the W-Class ferries. Three Portsmouth-based masters were cross-route trained and could be tasked to work on the W-Class ferries. 1.4.2 Crew on 26 August 2018 On 26 August 2018, Wight Sky’s 10 crew comprised the master, mate, bosun, three deck ratings, chief engineer, mechanic and two stewards. The master held an STCW8 ll/2 Certificate of Competency and had worked on Wightlink ferries since 2002. He retired in August 2015, but was regularly contracted by Wightlink on a self-employed basis. He had maintained his certification, familiarisation and safety drills and was employed on a shift-by-shift basis. The chief engineer held an STCW lll/2 Certificate of Competency. He had worked as a Wightlink chief engineer since March 2018 and previously served as chief engineer on deep-sea vessels. He had also worked for the MCA as an examiner of engineers. 8 STCW – International Convention on Standards of Training, Certification and Watchkeeping for Seafarers 1978, as amended.
14 1.4.3 Crew on 14 December 2018 On 14 December 2018, Wight Sky’s nine crew comprised the master, mate, bosun, three deck ratings, chief engineer, mechanic and one steward. The master held an STCW ll/2 Certificate of Competency. He had worked on Wightlink ferries since May 2015. The chief engineer was the same engineer who had been on board during the incident on 26 August 2018. 1.5 WIGHTLINK LTD 1.5.1 General Wightlink operated six ro-ro passenger ferries and two high-speed passenger ferries on three scheduled routes between the Isle of Wight, Lymington and Portsmouth. The W-Class ferries Wight Sky, Wight Light and Wight Sun were specifically commissioned for Wightlink’s Lymington to Yarmouth route. The company’s three other ro-ro ferries operated between Portsmouth and Fishbourne, and its high-speed ferries between Portsmouth and Ryde. Wight Sun was often used as a replacement for Portsmouth to Fishbourne ferries during their repair periods. 1.5.2 The introduction of the Wight Class ferries The W-Class ferries were built between 2007 and 2008 in Kraljevica, Croatia. Wight Light was constructed first, followed by Wight Sky and Wight Sun. On 25 February 2009, Wight Light and Wight Sky entered service, followed by Wight Sun on 25 May 2009. The beam and draught of the W-Class ferries were similar to those they replaced on the Lymington to Yarmouth service, but they were 6m longer and their lateral windage area was greater. 1.6 MAIN ENGINES 1.6.1 Overview Wight Sky’s six cylinder in-line D16 MH engines had a rated power output of 478kW at 1800rpm and were manufactured by Volvo Penta in Sweden. The engines comprised a main block with a ladder frame and a one-piece cylinder head with four valves per cylinder. They had a high-pressure fuel injection system and a twin entry turbo charger with a charge air cooler. The engine met EU Stage II emission requirements for mobile machinery not used on roads and was LR type approved. The Volvo Group’s D16 engine was designed for use in heavy duty commercial road vehicles and over 120,000 had been built since its 2004 launch. Volvo Penta is the marine arm of the Volvo Group and builds diesel engines for leisure and commercial vessels. With power ratings between 368kW and 551kW, the marinized D16 MH engine was the most powerful in Volvo Penta’s product range and over 3000 had been built since its 2005 release.
15 1.6.2 Engine build process The D16 engine blocks and cylinder heads were produced by a silica sand9 casting process. Most of the engines were destined for commercial road transport and assembled at a highly automated factory in Sweden, which used robotic machining and computer-controlled audit checks. Volvo Penta’s marine engines were assembled by hand on a separate production line (Figure 7). The connecting rods were cast in one piece and then broken at the big end to separate the connecting rod from its big end bearing cap. This process provided a matched mating surface between the rod and cap that helped reduce the risk of fretting wear at the joint. It also reduced the torque force required to tighten the big end bolts. 9 Silica sand has a grain size of around 190µm. Figure 7: D16 MH engine connecting rod installationGloved hand holding a connecting rod big end bearing cap Connecting rod big end bearing cap
16 During the assembly process, the engine build technicians had to unbolt the connecting rod caps and place them on a work surface adjacent to the engine block before lowering the piston and connecting rod assemblies into their cylinder liners. Once the connecting rods (with bearing shells) were positioned on their respective crankpin journals, the technicians refitted the big end bearing caps. The bearing cap bolts were tightened to the specified torque and the resistance of the rotating crankshaft checked to ensure it was within tolerance. To help reduce the risk of transposing the rods and caps, the matched parts were each stamped with the same serial number (Figure 8). 1.6.3 Engine maintenance schedules Volvo Penta’s D16 MH engine maintenance requirements were set out in a service protocol (Table 5). The intervals between the maintenance activities listed in the service protocol were given in years and engine running hours, e.g. every 12 months or 500 running hours, whichever occurred first. The annual accumulated running hours for the W-Class D16 MH engines was typically between 1500 and 2500. The service protocol did not include fuel injector overhaul and replacement or major maintenance work, such as cylinder head and rotating assembly (crankshaft, connecting rods, pistons, etc.) overhauls (Figure 9), which were based on engine operating conditions and condition monitoring results, including engine oil and coolant tests. Figure 8: D16 MH bearing cap and connecting rod serial numbers Connecting rod stamped with matching bearing cap and connecting rod serial numbers Bearing cap serial number Connecting rod serial number
17 Table 5: Volvo Penta D16 MH service protocol Service interval Service activity Action At 1000 hours Valve clearance Inspection ● Every 12 months or 500 hours, whichever occurs first Check software status Engine oil and oil filters replace Coolant level and antifreeze mixture Drive belts Fuel pre-filter, draining water / contamination Seawater filter Air filter Anode, protection system Impeller in seawater pump Transmission, according to manufacturer’s recommendations Inspection Replace Inspection Inspection Clean Clean Inspection Inspection Inspection Inspection ● ● ● ● / ○ ● ● / ○ ● ● / ○ ● / ○ ● Every 12 months or 1000 hours, whichever occurs first Fuel pre-filter, draining water / contamination Fuel fine filter Air filter Impeller in seawater pump Replace Replace Replace Replace ● ● ● ● Every 2000 hours Valve clearance Inspection ● Every 48 months or 2000 hours, whichever occurs first Drive belt Replace ● Every 3000 hours Wear kit in seawater pump Replace ● Every 48 months or 8000 hours, whichever occurs first Coolant Replace ● Key ● Service operation is recommended to be performed by an authorised Volvo Penta dealer ○ Service operation could be performed by owner/operator
18 Figure 9: Schematic of rotating assembly Connecting rod Bearing shell Big end bearing cap Gudgeon pin Piston Cap bolt Crankpin journal Crankshaft Oilway Main journal Small end
19 1.7 WIGHT CLASS PROPULSION SYSTEM 1.7.1 Overview The D16 MH engines drove Wight Sky’s 21R5/135-2 VSP units via individual Transfluid KPTO drain-type fluid couplings and a shared v-belt drive arrangement (Figures 10 and 11). The propulsion drive train included an ARCUSAFLEX AC7 WX torsional damper and a Rexnord Omega Elastomeric close-coupled E100 coupling10 (Figure 12). The v-belt drive gearing reduced the 1800rpm full engine operating speed to 1000rpm, the input shaft speed of the VSP units. Internal gearing further reduced this to rotate the VSP at 92rpm. The engine, torsional damper and fluid coupling were secured to their bedplates using flexible mounts designed to absorb vibration (Figure 13). 10 Elastomeric couplings are made from a flexible elastic material that transmits torque. Figure 10: Transfluid KPTO drain-type fluid coupling Catalogue image of a transfluid KPTO drain-type fluid coupling
20 Figure 11: Propulsion system layout Layout showing VSP units, omega couplings, ME4, ME3, propeller shaft and v-belt drive arrangement VSP unit Propeller shaft v-belt drive arrangement Omega couplings ME4 ME3
21 Figure 12: Rexnord Omega elastomeric close-coupled E100 couplingCatalogue image of an omega flexible coupling 1.7.2 Vessel operating profile The Lymington to Yarmouth ferries that operated before the W-Class vessels were also propelled by two VSP units in a similar fore and aft arrangement. The previous vessels’ VSP units were each driven by a single direct-drive Mirrlees Blackstone medium-speed diesel engine that ran at a constant speed of 750rpm; there were no other engine speed settings. The W-Class design concept aimed to provide a greater level of redundancy and a choice of engine configurations that best suited the propulsion system load demand while enabling lower exhaust emissions and better fuel consumption. To achieve this, the four smaller electronically controlled, high-performance, high-speed D16 MH engines were fitted. During the W-Class ferry commissioning trials11 conducted in 2008, it became apparent that the wash created by the VSPs, even at low pitch, was excessive for the confines of the river. To ensure compliance with the requirements of the Lymington Harbour Revision Order General Directions, Wightlink had already restricted the speed of its ferries to 4 knots (kts) on the Lymington River section of its route (the Lymington Harbour limit was 6kts). The commissioning trials identified that the engine running speeds needed to be reduced to minimise the wash and make the vessels more controllable. The W-Class propulsion system was originally designed with an engine idle speed of 600rpm, a clutch in/out speed of 950rpm and an operating speed of 1800rpm. Wightlink’s preferred option to resolve the wash issue was to provide variable engine 11 W-Class ferry safety and environmental impact trials conducted by Wightlink for acceptance by Lymington Harbour Commissioners, not involving Lloyd’s Register.
22 Figure 13: Flexible engine mountsFlexible engine mount in-situ Close-up example of a single flexible engine mount Single mount
23 speed control between clutch in/out (950rpm) and full operating speed (1800rpm). This option was unsupported by Volvo Penta because the engines did not have full automatic shutdown protection below speeds of 1200rpm. Instead, an intermediate fixed speed setting of 1360rpm was introduced. This speed setting was chosen because it avoided the propulsion system’s critical speed12 range. Wightlink contracted the Swedish electrical and automation company Callenberg Technology AB to develop the intermediate speed control capability and Volvo Penta provided the technical information needed to incorporate it into the engine’s existing control system. Wight Light and Wight Sky both had the intermediate speed setting installed locally before they entered service. Wight Sun had the intermediate speed setting incorporated during its build in Croatia, which LR’s local senior surveyor in charge had attended. The engine control system modifications were not subject to torsional vibration calculations. Following the introduction of the intermediate speed, Wightlink chose to use three engine speed settings; slow (950rpm), medium (1360rpm) and full (1800rpm). This varied the power delivered to the VSP units. Wightlink issued guidance on engine/VSP speed settings within Lymington Harbour in an annex to its W-Class operations manual titled Lymington Harbour – Safe Operating Procedure (Annex A). The guidance stated that the aft steering VSP unit was to be operated at the slow speed setting in the river unless wind speeds exceeded 25kts, gusting to 30kts. The use of the medium speed setting was restricted to higher wind speeds and other specific conditions and was the maximum permissible engine speed for the aft VSP unit in the river during normal operations. The forward VSP provided most of the vessel’s propulsion and acted as a tractor unit to pull the vessel forward, running at the full speed setting. This mode of operation resulted in minimum wash. During the river transits, both VSP units could be driven by one engine but, concerned about the number of unexplained engine shutdowns and failures, some of the masters chose to use two engines to drive the forward VSP. This adopted precaution, intended to prevent loss of propulsion in the event of a sudden engine failure, meant the engines were running for prolonged periods at very low power. During the approximate 10-minute section of the passage across the Solent, both of the ferries’ VSPs could be operated at their full speed setting. When more power was required, such as to increase speed to make up for delays or to manage environmental conditions, a second engine would be clutched in to provide more power to the forward VSP. The speed and power restrictions during the ferries’ Lymington to Yarmouth arrivals and departures resulted in the engines operating at their maximum continuous rating for about 25 to 30% of each crossing. 12 Critical speed is the rotational speed at which dynamic forces cause a machine component (such as a shaft) to vibrate at its natural frequency and can result in resonant vibrations throughout the entire assembly.
24 1.7.3 Fluid coupling power transmission The engines were clutched in and out using the Transfluid KPTO drain-type fluid couplings. In addition to transmitting the engine power to the VSPs, the couplings provided torsional vibration damping and shock and overload protection for the engines. The engines were clutched in and out by remote electrical solenoid valves that allowed the oil to be fed to the fluid coupling circuit when switched on (clutch in) and oil to drain through orifices located on the periphery of the fluid coupling when switched off (clutch out). During the W-Class commissioning process, it became apparent that disengaging and stopping one of a pair of running engines was taking too long. This was because of the time it took for the coupling fluid to drain and was particularly evident when the engines ran at the lower speed settings. This led to the shutdown engine being driven by the onload engine via the common belt drive. Following the trials, the couplings were modified to increase the rate of oil drainage and allow the engines to stop when declutched. Coupling fluid drain times were not provided in the Transfluid data sheet and no records were kept of the drain system modifications. Post-accident tests were conducted on 5 September 2018 to establish how long it took for the couplings to disengage when the engine protection system tried to stop an engine. With single engine drive, it took 15.1 seconds at the full speed setting and 17.4 seconds at the intermediate speed setting. When two engines were running in parallel at full operating speed, driving the same VSP unit, it took about 30 seconds for the coupling on the declutch engine to disengage. During this time, the onload engine drove the declutching engine. 1.8 ENGINE COOLING SYSTEM 1.8.1 Overview Each ME had a low temperature (LT) and high temperature (HT) cooling circuit, each of which circulated the engine coolant through seawater box coolers fitted into the vessel’s hull (Figure 14). The LT coolant was circulated through the engine’s charge air cooler and the fluid coupling oil cooler by an electric booster pump. The HT coolant was circulated through the engine’s oil cooler, cylinder jacket space, cylinder head, exhaust manifold and turbo charger by an engine driven pump. Both cooling systems had a pressurised expansion tank. The separation of the LT and HT circuits differed from standard D16 MH engine installations, which operated a single circuit to and from an engine mounted expansion tank (saddle tank) that was fitted with a pressure relief cap, like those fitted to road vehicles. In the W-Class installation, the saddle tanks were modified by replacing the pressure relief cap with a pipe running to a HT expansion/header tank approximately 1m above the engine, which was fitted with a 100kPa (1 bar) pressure relief cap. Due to the structural arrangements, the pipework between ME1 and ME4’s saddle tanks and HT tanks was routed under the engines, creating a U-bend. This made the venting of air from these systems difficult.
25
Figure 14: Engine cooling systemCross-section diagram of engine cooling system showing locations of 11 components Represents the keel cooling system on the W-Class vessels When the vessels were delivered from the shipbuilders, the pressure relief caps were found to be loosely fitted to the expansion tanks. Wightlink’s engineering staff assumed that this was how the system was meant to operate and the caps were left loose. After the ferries had operated for several years, RKM service engineers noticed this practice and advised Wightlink that the caps should be tight as the engines were designed to operate with a pressurised cooling system. After about 18 months’ operation, the vessels started to suffer from cylinder liner failures. These were thought to be a result of difficulty in venting the HT cooling system and Volvo Penta advised the installation of a T-piece to aid effective venting of the engines’ cooling water saddle tanks (Figure 15). Following the two catastrophic engine failures in 2018, Volvo Penta was unable to determine the justification for the T-pieces and advised their removal, along with a revision to the pipework design to remove the U-bend in the systems and a change to pressure relief caps rated at 75kPa (Figure 16). Volvo Penta service bulletins relating to the coolant system included: ●Quality Campaign 4380-2165, Q0003 – Improved Cooling ●Coolant Pump, Leakage (26-2 41 1).
26 Figure 15: Coolant system T-piece
27 Figure 16: Modified cooling system high temperature circuit pipework Revised HT pipework with arrow to highlight the original HT pipework's indirect route under deck plates from saddle tank to expansion tank Revised HT pipework showing HT/LT expansion tank installed near ceiling and new HT pipework direct route running along wall behind it Original HT pipework indirect route under deck plates from saddle tank to expansion tank New HT pipework direct route HT/LT expansion tank
28 The aim of the Improved Cooling Quality Campaign was to improve the cooling system performance of engines using remote heat exchangers by increasing the venting capacity. It required a venting orifice in the air filter bracket to be enlarged to 5mm and the replacement of the HT coolant pump. Volvo Penta had determined that the original vent hole was too small and could easily clog. The aim of the Coolant Pump Leakage bulletin was to alert service centre dealers to the number of warranty claims Volvo Penta had received about coolant pump leakages. It advised that a weep hole for draining a space behind the pump’s mechanical seal could become blocked. It also stated that: Pumps with burnt seal faces have been returned. It can be caused by air pockets in the coolant system, which have been trapped at the seal and led to dry-running. If the faces of the seal are burnt, that means that the seal temperature exceeds its admissible limit. This can happen if the boiling point of the coolant is lowered (ex: too much water compared to glycol). Engineering investigation also showed this can happen in case operating the engine with low coolant levels and/or incorrect water/glycol concentration. [sic] Wightlink was unaware of these bulletins. However, RKM carried out the necessary modifications in 2012 and 2013. 1.8.2 Engine coolant Wightlink used the engine coolant specified by Volvo Penta. Known as green coolant, it was available either as a concentrated liquid that had to be mixed locally with water or as a pre-mixed 40 to 60 coolant liquid to water ratio. Wightlink ordered the coolant concentrate and mixed it on board the vessels with water supplied from ashore in Lymington. The Volvo Penta Operator’s Manual stated: IMPORTANT! Coolant must be mixed with clean water, use distilled - de-ionized water. The water must comply with the requirements in ASTM D498513, refer to “Water quality”. The water quality section of the ASTM D4985 standard stated that the total hardness was to be less than 9.5°dH14. The water supply to the Lymington ferry terminal was moderately hard, with a total hardness of 14°dH. In November 2014, Volvo Penta issued a service bulletin titled Introduction of New Coolant. This promoted the use of a new coolant (yellow) that contained inhibitors better suited to the materials used in more modern engines, including the D16 MH range. It also counteracted cavitation and galvanic corrosion and offered better protection against corrosion and the build-up of deposits. Its boiling point was 175°C compared to green coolant’s 100°C. The bulletin stated: NOTE! In the case of D13 Marine, D16 Marine and TWD1643GE engines delivered with Volvo Penta coolant (green) we recommend replacement with Volvo Penta coolant VCS (yellow). Before replacement, carry out cleaning using oxalic acid in accordance with Service bulletin 26-0-29. 13 Standard Specification for Low Silicate Ethylene Glycol Base Engine Coolant for Heavy Duty Engines Requiring a Pre-Charge of Supplemental Coolant Additive (SCA). 14 A degree of General Hardness °dH, (deutsche Härte) is equal to 17.848 mg/l calcium carbonate.
29 Wightlink was unaware of this service bulletin and no action was taken to change the coolant on the W-Class vessels. In March 2019, following discussions arising from this investigation, Volvo Penta informed Wightlink that, due to the difficulty in cleaning the cooling systems on board these vessels, Wightlink should continue to use the green coolant. The engine maintenance schedule stated that the cooling system should be checked, cleaned and have the fluid replaced by an authorised Volvo Penta workshop every 2 years. There were no records of the coolant being tested or replaced on the W-Class. As part of the investigation, samples of the coolant in all 12 W-Class MEs were tested. The samples were a dark colour instead of clear and all showed signs of contamination, glycol degradation and precipitation15. 1.8.3 Engine cylinder liner failures In October 2012, an LR surveyor raised concern about the number of cylinder liner failures that had occurred on board Wightlink’s W-Class ferries (Tables 1, 2 and 3). In response, RKM’s technical manager opened a service request, informing Volvo Penta of the concern raised by the certifying authority and requesting guidance on how to resolve the issue. The technical manager identified six engines that had suffered liner failures over a 2-year period. The engine running hours at the time of failure ranged between 6027 and 14860; four of the engines had accumulated less than 10000 running hours. RKM’s technical manager attributed the problem to coolant leakage into the engine sump due to cavitation erosion in the liner at the annular groove seals located at the lower end of the liner/block interface. He suggested that long periods of off-load running might be causing the liner to oscillate in the engine block (Annex B). The technical manager also advised Volvo Penta that the engines were operating on green coolant and it was his understanding that the coolant was checked daily and replaced every 2 years during vessel refit periods. Volvo Penta’s reply stated that it had not received any similar reports and agreed that liner oscillation might be a possible cause, but advised that low cooling system pressure could cause similar problems. Volvo Penta also expressed hope that the next inspection would show an improvement as Wightlink was now aware of the problem and would not run the engines off-load for extended periods. RKM provided no further feedback and Volvo Penta closed the service request on 14 January 2013. Unaware of this, and awaiting further guidance, after amending the periodicity of engine overhauls as discussed in section 1.13.3 below, Wightlink and LR also took no further action. In July 2015, the W-Class superintendent told an LR surveyor that he had held discussions with RKM about three engine blocks that had all suffered from pitting, and that he had asked RKM to consult with Volvo Penta. The Wight Sky ME2 that failed catastrophically on 12 September 2017 (Event 1) was a rebuilt engine that had been assembled using a repaired engine block from a Wight Sun engine and a crankshaft from a Wight Light engine. The engine block had suffered pitting erosion and was repaired using the epoxy coating product Belzona 1391T16 (Belzona). On 18 August 2017, RKM staff made the repair, which was sanctioned by Wightlink 15 Glycol reacts with oil additives, causing precipitation. 16 Belzona 1391T is a two-part ceramic filled epoxy coating that provides erosion and corrosion resistance to high temperature equipment operating under immersion up to 120°C (248°F).
30 following discussions with an LR surveyor. Similar Belzona repairs had been undertaken by another engine repair company and the LR surveyor assumed that RKM staff were following a Volvo Penta agreed repair method. Volvo Penta did not approve Belzona repairs and no records could be found of any engine block repair service requests raised by RKM or received by Volvo Penta. 1.9 ENGINE LUBRICATION SYSTEM 1.9.1 Overview The D16 engine was pressure lubricated by an engine-driven gear pump that, at full speed, supplied oil at a pressure of about 4 to 5bar to the engine’s bearings and moving parts via two full-flow filters and one bypass filter (Figure 17). Oil temperature was maintained by an engine mounted cooler. Two lubricating oil galleries were drilled along the engine block; one fed the crankshaft bearings and the other was the piston cooling oil duct, which provided oil for both piston cooling and lubrication (Figure 18). The following seven valves controlled the oil flow:
● Bypass filter overflow valve – this valve opened at pressures greater than 1.1 bar if the bypass filter started to become blocked and secured the oil supply to the turbocharger.
● Full-flow filter bypass valve – the valve opened at pressures above 2.1 bar if the full-flow filter became blocked and thereby secured lubrication.
● Oil cooler bypass valve – this valve opened when the oil temperature was low i.e. after start-up. When oil temperature rose the valve closed and forced the oil through the cooler.
● Piston cooling valve – this valve opened and provided oil to the piston cooling channel when engine speed was increased above idle.
● Piston cooling oil control valve – this valve maintained the piston cooling pressure at a constant level once the piston cooling valve had opened.
● Lubricating oil pressure reduction valve – the valve controlled the oil pressure by feeding excess oil back to the engine’s oil sump.
● Safety valve – this valve opened and returned oil back to the sump when oil pressure was too high. 1.9.2 Oil filters The full-flow oil filters had a 40-micron (µm) mesh size and gave 99% throughput to the main oil circuit at 38µm filtration and 50% throughput at 14µm. The bypass filter had low flow and a high degree of filtration capabilities using a 10µm mesh and gave 99% throughput to the turbo charger at 11µm filtration and 50% throughput at 4µm.
31 Figure 17: Engine lubricating oil systemIllustration showing components of engine lubricating oil system, including pistons, oil coolers and filters. Key shows flow of 10-micron filtered oil; 40-micro filtered oil; oil supply to full-flow filters and oil cooler; and piston cooling oil Piston cooling oil Oil supply to full-flow filters and oil cooler 10-micron filtered oil 40-micron filtered oil Bypass filter overflow valve Centre filter Part-flow filters of 10-micron mesh size Full-flow filters of 40-micron mesh size Forward filter Piston cooling valve Piston cooling oil control valve Lubricating oil pressure reduction valve Safety valve Oil pump suction Piston cooling oil nozzle Lubricating oil to main journal crank pin and gudgeon pin Oil in sump Oil cooler bypass valve Crankshaft-driven oil pump Full-flow filter bypass valve Oil cooler
32 Figure 18: Engine block lubricating oil galleries Three-dimensional diagram of engine block lubricating oil galleries, showing 2 galley sealing plugs each side Gallery sealing plugs Gallery sealing plugs
33 Up until 2015, classification society rules required the use of a switchable oil filter arrangement (duplex filter) that allowed the main oil filters to be changed individually while the engine was running. To meet this requirement the D16 MH engine full-flow oil filter had a central changeover cock (Figure 19). A Service Bulletin Recall Campaign (R0001), dated 1 August 2011, required an adaptor change within the duplex filter changeover cock mechanism. On the W-Class ferries, the modification resulted in an approximate 1.0 bar pressure drop in the lubricating oil system at full speed to between 3 and 4 bar. The bulletin did not explain the reason for the modification. During Volvo Penta’s investigations into the causes of the Wightlink engine failures, a design error was identified with the oil filter arrangement. It was discovered that, at full engine speed, the full-flow filters’ bypass valve opened slightly and allowed 10 to 20% of unfiltered oil to flow through the circuit. The overflow valve for the main filters was affected by the pressure drop caused by the changeover cock. In April 2019, Volvo Penta informed Wightlink and subsequently issued a D16MH/MG service bulletin for the overflow valve spring replacement. In Wightlink’s case, as the changeover cock was no longer required to meet classification society requirements, Volvo Penta advised its removal from the oil filter block. This work was completed on the W-Class vessels (Figure 20). 1.9.3 Oil testing Volvo Penta’s service protocol recommended that the engine lubricating oil be replaced every 12 months or 500 running hours, whichever came first. Volvo Penta explained that the replacement interval might need to be reduced dependent on the oil quality and the sulphur content of the fuel in use. The W-Class ferries operated on low sulphur fuel and Wightlink intended to manage the oil change interval through a regular regime of oil condition monitoring, enabling them to both maximise the life of the oil and maintain an awareness of engine degradation. The oil renewal period could then be varied dependent on the test results of the samples taken. Wightlink started with an oil sampling and replacement interval of 400 running hours. Samples of the old oil were sent to a laboratory for testing and analysis against Volvo Penta’s specification; the results were usually received a few days later. When a sample result indicated an issue with the oil quality, Wightlink’s standard practice was to test samples of the new oil after 50 to 100 hours. The aim of the retest was to rule out spurious results and possible contamination when the first sample was taken. The laboratories relied upon accurate labelling of test samples to ensure that the results were assessed against the correct criteria for the engine and oil being tested. Each engine had a unique identification number for lubricating oil test purposes, which linked the sample to all previous samples for that engine. The unique identification number was regularly missed from the documentation provided by ship’s staff, leading to samples being identified as fit for use against a standard set of criteria rather than the more stringent criteria developed by Volvo Penta to suit the high-performance nature of the D16 MH engines.
34 Figure 19: D16 MH lubricating oil filters (with changeover cock)Three-dimensional diagram of 2 main oil filters and 1 bypass oil filter in oil filter housing, showing bypass valve for full-flow filter and full-flow duplex filter changeover cock Main oil filters Full-flow duplex filter changeover cock Bypass oil filter Oil filter housing Bypass valve for full-flow filter
35 Figure 20: Replacement lubricating oil filters without changeover cock Close-up of three lubricating oil filters in-situ Oil filter housing Main oil filters Bypass oil filter Bypass valve for full-flow filter
36 The early oil sample analysis returned mixed results across the 12 engines. Some identified higher than normal levels of wear elements, contamination and low levels in the oil’s residual Total Base Number (TBN17). Even so, in discussion with RKM, Wightlink technical staff decided that the results were good enough to extend the oil replacement hours. These were raised in two stages, first to 600 hours during 2013 and then to 800 hours about 12 months later. However, record-keeping was sporadic and the running hours between renewals varied considerably. As part of the risk mitigation plan put in place after the catastrophic failure of Wight Sky’s ME4 on 14 December 2018 (Event 5), the oil replacement schedule was reduced back to 400 running hours. The intervals between oil sample testing were also reduced. The new regime required oil samples to be tested after the first 10 running hours and subsequently every 100 running hours. Volvo Penta’s designated testing laboratory analysed the samples and the results were promulgated to the service centre dealer contracted to maintain the engines. 1.9.4 Lubricating oil analysis service bulletin In April 2015, Volvo Penta issued Service Bulletin 17-0 23 - Engine Oil & Oil Analysis. The Bulletin referred to industrial engines and marine diesel engines. It described the different additives and the various oil types and their suitability for various engines and operating profiles. The bulletin specified the oil parameter limits (Table 6) within the oil sample report analysis and the respective oil change intervals. The oil used by Wightlink allowed a 500 running hour change when used with fuel containing less than 0.5% sulphur content by weight. The bulletin did not provide guidance on the frequency of normal oil sampling, but stated: In cases where oil analysis shows high PPM content, carry out:
- Oil change and filter replacement.
- Further oil analyses:
a. At a few number of running hours, after the oil change and filter
replacement. b. And then three oil analyses at intervals of 100 hours. And, These oil analyses provides an answer to the tendency (after oil & filter replacement). It may turn out as follows:
- PPM content drops. Wear is normal.
- PPM content remains at a high but stable level. Wear is normal.
- PPM content continues to rise. This indicates abnormal wear and the
customer should be informed. 17 TBN is a measurement of basicity expressed in mg KOH/g. TBN for marine grade lubricants is typically 15-80 mg KOH/g, to increase their operating period before the lubricant requires replacement.
37
- PPM content varies greatly up and down. This indicates presence of foreign
particles caused by working environment, storage of oil etc. It is important to note that iron content rises with faulty air cleaner system before it is possible to note rising silicon content, … On fuel dilution of the oil, the bulletin stated: Low load or cold application?
○Collect info regarding drive cycle, engine history.
○Try to change running cycle and increase load. NOTICE! Frequent starts of an engine, excessive idling and cold running. Table 6: Oil analysis parameter limits Parameter Possible Origin/Cause Limit Unit Sodium, Na Coolant leak ≤ 10 ppm Silicon, Si Sand, dirt etc ≤ 30 ppm Aluminium, Al18 Pistons, charge air cooler, dirt ≤ 15 ppm Chrome, Cr Piston rings, valve stems ≤ 15 ppm Copper, Cu19 Bid-end and main bearing shells, gudgeon pin bushes, oil cooler, heat exchanger ≤ 30 ppm Iron, Fe Crankshaft, cylinder liner, camshaft, cam follower, valve guides ≤ 100 ppm Lead, Pb Big-end and main bearing shells ≤ 30 ppm Tin, Sn Outer surface of sliding bearings ≤ 15 ppm Nickel, Ni Layer between surface and copper layer on sliding bearings, rocker arm bushes ≤ 15 ppm Molybdenum, Mo Piston ring ≤ 15 ppm Soot Incomplete combustion ≤ 3 % TBN TBN indicates remaining alkalinity after acid neutralisation
≥ 4
Water Coolant, condensation ≤ 0.2 % Fuel20 Incomplete combustion, internal leak on fuel system etc ≤ 6 % Viscosity Reduction: fuel dilution, oil shearing. Increase: oxidation, contamination by soot. Min: 9 cSt 18 Can be considerably higher during running-in. 19 Several 100ppm copper levels can be found during the early life of the engine. This copper is flushed out from the oil cooler and is not harmful to the engine. 20 If fuel dilution is ˃ 6% and viscosity is ˃ 9cSt then engine is okay. If fuel dilution is ˃ 6% and viscosity is ˂ 9cSt continue with “Fault Tracing: Fuel Dilution”.
38 1.10 ENGINE CONTROL, MONITORING AND PROTECTION SYSTEM Each W-Class ME was fitted with a Volvo Penta Engine Control Unit (ECU)21. The ECUs were supplied at build and mounted to the engine. The ECU monitored and logged the engine status and managed all speed, torque, fuel injection and emission controls through a series of connected sensors. The sensor readings were logged by the ECU but not time stamped. Each ECU provided outputs to local alarm panels and the ferries’ Kongsberg machinery monitoring system panels in the MMR and on the bridge. The Kongsberg system provided time-stamped alarm information. The ECU also provided emergency shutdown and power reduction protection. Emergency shutdowns involved the immediate declutching of the engine and removal of fuel and could be triggered by:
● high coolant temperature (120°C);
● low gearbox oil pressure (400kPa);
● low lubrication oil pressure (150kPa);
● low coolant pressure (30kPa); and
● engine overspeed. The power reduction function, referred to as ‘derating’ in the electrical section of Volvo Penta’s Workshop Manual, provided protection in response to certain less critical high temperature and low/high pressure readings, e.g. high coolant (101°C) and oil (128°C) temperatures, low piston cooling pressure (150 ± 20kPa) and rapid increase in crankcase pressure. The derate functions were inactive at engine speeds below 1200rpm and the percentage of load shedding differed according to alarm type, sensor readings and engine speed. Parameters that could result in an automatic engine derate were grouped under a common alarm on the Kongsberg system. To identify the specific cause of the common alarm, the shipboard engineer had to inspect the relevant local alarm panel in the engine room. The Workshop Manual included fault-finding guidance on the electrical systems but did not provide instructions on how to test the common alarms and their respective derate functions. Wightlink’s technical staff were aware of the ECU derate functionality but had never tested its operation or noticed the engines being derated automatically. Following the catastrophic engine failures in 2018, Volvo Penta, with the agreement of Wightlink, LR and MCA, changed the piston cooling oil pressure protection from ‘alarm and derate’ to ‘alarm and shutdown’. In March 2019, during a routine software upgrade to its engine range, Volvo Penta identified that the 478kW rated D16 MH engines were not supplied with the derating software. Further analysis identified that, as a result, the derating function of these engines did not work and, in the case of the Wightlink engines, never had. 21 Engine Control Unit is used in this report as a generic term for Volvo Penta’s Marine Commercial Control system, which includes a standalone hard-wired engine shutdown unit.
39 1.11 WIGHTLINK TECHNICAL AND MAINTENANCE MANAGEMENT 1.11.1 Technical management team Wightlink’s Maintenance and Repair Organisation was responsible for the day-to-day technical management of the ferry fleet and the planning and delivery of maintenance periods, refits and dry dockings. Each Wightlink vessel had a nominated senior master and a survey chief engineer. The survey chief engineers were responsible for ensuring the consistent maintenance of engine rooms, machinery spaces, deck machinery and auxiliary equipment. They also oversaw the maintenance and repair work conducted during refits and dry-docks. The onboard engineers, many of whom had worked on Wightlink ferries for many years, operated and monitored the machinery, undertook routine planned maintenance tasks, including oil and filter changes and tappet adjustments, and carried out minor breakdown repairs. Major planned maintenance tasks and complex breakdown repairs were typically performed by shore contractors. The technical management team structure had been subject to significant change over several years, particularly between 2016 and 2018, when:
● The Head of Maintenance and Repair position was changed twice.
● The W-Class technical superintendent was required, for a short period of time, to take on the role of technical superintendent for Wightlink’s entire fleet. During this period he was provided with support from the office-based chief engineer.
● The Portsmouth fleet technical superintendents changed three times. In 2017, Wightlink introduced an electronic computer-based integrated management system designed to provide both crew and office staff with a one-stop shop for the management of safety, maintenance, and purchase requests. The integrated system replaced a largely paper-based maintenance management system that had fallen into abeyance. The computer-based system’s roll out was problematic, with initially low uptake by the on board engineering teams. Volvo Penta recommended that one of its authorised dealers performed all maintenance tasks listed in its maintenance protocol (Table 5). In 2008/09 it identified four minor inspection tasks that the engine owner or operator could perform. Wightlink asked RKM, on an ad hoc basis, to undertake most of the ME maintenance work. 1.12 VOLVO PENTA 1.12.1 Volvo Penta dealers Volvo Penta operated as a business partner to its network of independent Volvo Penta Centre dealers and smaller Volvo Penta Service dealers. The dealers sold and serviced Volvo Penta products based on the markets they served. Volvo Penta contacted its dealers twice a year. The discussions covered areas such as warranty, training reviews, dealer assessment, tooling inspections and new products.
40 1.12.2 Service requests and service bulletins Volvo Penta dealers raised service requests through the engine manufacturer’s internal reporting system (ARGUS), which facilitated communication between dealers, Volvo Penta Sweden and its UK headquarters. The system was monitored for recurrent problems to enable an effective response. Where updates were no longer provided from dealers on a particular issue, the respective Volvo Penta product team perceived the issue as resolved locally and closed out the service request on ARGUS. Volvo Penta issued service bulletins to its dealers to promulgate information about engine modifications, servicing improvements and equipment design changes. The dealers were expected to contact their customers and either provide them with advice to help update their planned maintenance systems or arrange for necessary work to be completed. 1.13 RK MARINE LTD 1.13.1 Overview RKM was based in Swanwick, England, about 20 miles from Portsmouth and 30 miles from Lymington. It was an authorised Volvo Penta Centre dealer and had sold, serviced and overhauled Volvo Penta engines and associated equipment for more than 40 years. It also supported a network of Volvo Penta Service dealers. RKM split its engine maintenance work between leisure (about 80%) and commercial (about 20%) vessels. Wightlink was RKM’s only customer operating D16 MH engines. 1.13.2 Maintenance of Wightlink’s D16 MH engines Volvo Penta’s installation engineers proposed RKM as the dealer for Wightlink’s D16 MH engines during the W-Class vessel commissioning process. Three RKM engine technicians were trained to service the D16 MH engine, one of which was the technical manager, who also deployed to a ferry when required by Wightlink. The technicians operated a duty callout arrangement. The various stages of a typical engine overhaul were often undertaken by different engine technicians. Wightlink awarded RKM short-term contracts for its engine work; it was not tasked to provide any form of maintenance management or engine condition monitoring service. No calibration data or other measurements were provided and no written maintenance or operational advice was given to Wightlink in light of any findings from engine maintenance or repair. Where an engine problem necessitated an overhaul, RKM provided an estimated cost for the work based on a standard set of overhaul kits available from Volvo Penta. Once stripped down, RKM and Wightlink technical staff and, when informed, an LR surveyor, would assess the full scope of work and RKM would quote for completing the overhaul. Volvo Penta had no input into the commercial arrangements between Wightlink and RKM.
41 Engine overhauls were performed ashore at RKM’s workshops and its engine technicians reinstalled the overhauled engines on the vessels. RKM did not have a dynamometer to load test the engines, but used the dynamometer services of another Volvo Penta Centre post-Event 1. The production plant in Sweden used dynamometers to test new engines. 1.13.3 Operational guidance Volvo Penta’s service protocol did not include major maintenance work such as cylinder head, rotating assembly and fuel injector overhauls or replacement. These were dependent on local engine operating conditions and the results of through-life condition monitoring. RKM discussed the major overhaul arrangements for the W-Class engines with Wightlink, which decided that the cylinder heads would be overhauled at 10000 running hours and the rotating assembly at 20000. These arbitrary figures were based on limited experience of the D16 MH engines and did not account for factors such as lubricating oil and coolant condition monitoring. During 2012 and 2013, when cylinder liner and engine block cavitation erosion problems arose in W-Class engines, Wightlink, in discussion with RKM and LR, agreed to perform major overhauls after 15,000 running hours. This included cylinder liner and engine block inspections. In December 2017, Volvo Penta issued a safety bulletin providing updated fuel quality requirements for commercially operated engines. For those running on marine distillate fuels, it stated that the Fuel injection equipment replacement intervals shall be halved. No service interval for injectors had been stated by Volvo Penta for these engines and RKM continued replacing them when the cylinder heads were overhauled. RKM provided operational advice verbally to Wightlink staff and LR surveyors during face-to-face meetings. This included the need to ensure that the pressure relief caps on cooling system header tanks for the engines were tight and that the coolant was changed in accordance with the maintenance schedule. 1.13.4 Application of service bulletins RKM received all Volvo Penta service bulletins and recall campaigns and promulgated relevant information from bulletins to the customers it had long-term through-life support contracts with. Wightlink was not such a customer and therefore did not benefit from this service. In the course of its contracted work on the W-Class ferries, RKM completed maintenance tasks in accordance with the guidance contained in the service bulletins without specifically informing Wightlink of the service bulletins’ details. Furthermore, Volvo Penta service bulletins relating to maintenance tasks not performed by RKM, were not brought to Wightlink’s attention by the engine manufacturer or RKM and so were not captured within Wightlink’s planned maintenance system.
42 1.13.5 Quality management system audits RKM’s quality management system was ISO 900122 accredited and was audited annually by an external assessor. The audit was wide-ranging and covered all aspects of the business, including parts supply, training, technical publications, risk assessments and lifting equipment. The audits included interviews with the managing director and selected staff across the company. No specific customer complaints were noted in the audit reports between 2009 and 2018. The comments in RKM’s December 2013 audit report included: NCRs23 are logged, investigated with appropriate corrective and preventive measures applied. Records maintained, although very few. Complaints are very low - virtually non-existent. It is very rare for a Volvo part to fail inside its warranty period. Returned items are generally due to the wrong part being ordered (by customer) and parts being ordered and then not used. About continual improvement, the report stated: Company is pro-active and uses the data collected from analysis and audits to refine its processes to continually try and improve its service to customers. On control of monitoring and measuring equipment, RKM’s 2014 audit report, stated: Company uses some measuring equipment i.e. gauges but not end product critical. No calibration log. And for the same item, the 2017 audit report stated: Company uses torque wrenches that are calibrated against a Check Line … Torque Tester. Evidence of tester having been calibrated in Oct 2014. It is unclear as to what the calibration regime is for this piece of equipment. OBS24 – Unclear as to the calibration regime for Check Line torque tester. RKM was also subject to audit by Volvo Penta. These audits primarily focused on sales targets, the company’s management style and its impact on the rate of staff changes, staff attitude and cooperation. Volvo Penta took no steps to address these concerns. 22 ISO 9001 is a quality management standard established by the International Organization for Standardization (ISO). 23 A non-conformance report (NCR) is a note or document that addresses a specific issue that fails to meet quality standards. 24 An observation (OBS) is a statement of fact made during an audit, often used to highlight an area for future review.
43 1.14 EXAMINATION OF THE FAILED ENGINES 1.14.1 Overview The engines listed in Table 4 (failure Events 1 to 5) were inspected by Volvo Penta engineers during this investigation. Wight Sky’s Event 1 engine was examined at Volvo Penta’s Europe Office in Warwick, UK; Event 2, 3, 4 and 5 engines were sent to Volvo Penta’s factory in Gothenburg, Sweden for closer examination. 1.14.2 Wight Sky main engine number two failure 12 September 2017 (Event 1) Volvo Penta identified the debris in the oilways that led to the engine’s catastrophic failure during its initial examinations in the UK immediately after the accident. The debris had reduced the oil supply and caused the crankshaft’s number five main journal bearing shells to turn; this blocked the lubricating oil supply to the journal and number four crankpin. The presence of the debris was attributed to poor engine hygiene practices during rebuild. The re-examination of the engine in Sweden focused on the condition of the liners, pistons, engine block, various oilways and reciprocating components (Figure 21). The examination identified piston and liner scuffing on all units, scoring within the oil pump, and scoring to main bearings. It was also noted that a Belzona repair had been made to the block in way of the liner landing face. Figure 21: Event 1 – engine block re-examination Removed engine block on floor with someone standing close by
44 The engine’s number six piston and connecting rod assembly were sent to Exponent International Limited for the extraction and examination of debris seen within the connecting rod oilway. Exponent International Limited’s report (Annex C) stated that the debris extracted from the oilways included two carbon particles, approximately 1mm3, surrounded by wear metal material. Since the oil supply to the oilway came via the crankshaft, and the crankpin bearing clearances were much smaller (127µm) than the debris, it must have been present in the oilway before the engine was started. Separate examination of debris found embedded in the main bearing shells identified particles of silicon dioxide (silica sand), cadmium oxide and aluminium oxide. 1.14.3 Wight Light main engine number one main bearing seizure 2 February 2018 (Event 2) On 2 February 2018, Wight Light’s ME1’s ECU shutdown automatically due to low lubricating oil pressure. The engine had accumulated a total of 23400 running hours from build and RKM had overhauled it 7 months earlier at 22700 running hours. The initial engine inspections identified that the crankshaft had seized and that one of its main journal bearing shells had turned. During its overhaul, RKM fitted a new engine block25 and a spare cylinder head. Volvo Penta’s December 2018 examination identified that the crankshaft main journal bearing caps numbers one and seven had been transposed (Figure 22) during RKM’s engine overhaul 700 hours earlier. 1.14.4 Wight Light main engine number two melted piston and partial seizure 3 August 2018 (Event 3) Wight Light’s ME2 was an original engine fitted during build. In August 2017, RKM replaced the engine’s fuel injector sleeves having been contracted to investigate an unspecified issue with the engine. On 29 July 2018, the engine oil was replaced after 448 running hours due to fuel contamination. On 3 August 2018, with approximately 21000 running hours, the engine suffered a high exhaust temperature alarm and white smoke was seen coming from the funnel. Having quickly determined that it was running on five cylinders the engine was declutched and stopped. On 14 August, RKM attended and installed an overhauled set of injectors but within 5 minutes of starting the engine began to generate excessive amounts of white smoke and made abnormal noises. When the engine’s cylinder head was removed the RKM technician discovered the crown of number six piston had melted and found liner scoring to several other units (Figure 23). When the engine was stripped down at Volvo Penta’s Gothenburg facility, the initial examinations identified that:
● The engine was last overhauled at approximately 13000 hours.
● Pistons one, five and six were seized in their liners.
● Cylinder liners one, three, five and six were badly scuffed. 25 A short block is an engine sub-assembly comprising the portion of the cylinder block below the head gasket but above the oil pan.
45
● Numerous lubricating oil samples from 2017 and 2018 noted that fuel contamination was present.
● Between April and July 2018, there was no evidence of investigation and correction of the fuel contamination cause by the engine operators. Figure 22: Event 2 – main journal bearing cap number seven Heat damage Cap identification number Figure 23: Event 3 – number six cylinder scoring and melted piston crown View looking down into number six cylinder with visible scoring inside on liner and melted piston crown at the bottom Cylinder liner scoring Melted piston crown
46
● The ECU was not original to the engine, having been transferred from the replacement engine.
● Number seven crankshaft main journal bearing was more worn than the others, probably caused by seizure on number six piston.
● The upper piston rings showed discolouration in the contact surface towards the liner.
● There were high levels of carbon build-up above the second piston ring. Volvo Penta sent the engine’s liners, pistons and piston rings to their respective manufacturers for more detailed examination. The pistons were manufactured by MAHLE GbmH and its examination report included the following observations and conclusions for the piston and liner scuffing:
● The scuffing marks to the rear of number three liner most likely started at the top piston ring.
● The scuffing damage to the pistons was most likely secondary to the scuffing of the top piston rings.
● The melted crown of number six piston was clearly indicative of abnormal combustion. However, this could also be linked to oil carry over resulting from ring damage.
● The scuffing damage could be linked to lack of lubrication between the top ring and the cylinder liner. This could have been the result of over spraying or abnormal injection but the remarkable cleanliness of the pistons, after so many running hours and a seizure, was indicative of oil dilution. It should be noted that the piston manufacturer did not have access to the oil test results. The report also identified that:
● Number four piston had suffered from graphite delamination at the piston skirt. This was subsequently clarified as being due to contact with coolant.
● Number one cylinder liner had suffered from sporadic corrosion/erosion attack of the outer face in way of the water jacket. The piston ring manufacturer Federal-Mogul Powertrain’s examination report did not identify any clear underlying issues involving the piston rings. The summary of its investigation report included:
●A drift of the injectors which could cause fuel over-spraying/wash-off of the oil film from the cylinder wall and overrating [overloading] should be investigated as a possible contributor.
●The engine oil used should be analysed to check for a possible cooling water ingress, fuel in oil, foreign particles etc.
47 1.14.5 Wight Sky main engine number two catastrophic failure 26 August 2018 (Event 4) In October 2017, Wight Sky’s new-build ME2 was installed onto the same flexible mounts as the previous engine, which were the original mounts fitted at build. Alignment of the Event 1 engine had been problematic and the flexible mounts at the free end of the engine had been bolted to the engine bedplate using new bolt holes drilled by RKM. The replacement engine had also been installed using these new bolt holes. On 8 January 2018, the engine oil and the oil and fuel filter elements were renewed after 801 running hours. A further oil and filter change was carried out 4 months later; the running hours were not recorded. In March 2018, about 1400 running hours after installation, ME2 began to suffer increasing levels of vibration, causing the failure of steel brackets for the air cooler. To reduce the vibration, new engine mounts were fitted using the original bedplate boltholes. During this period, the engine’s flexible coupling was reported to have failed three times, twice prior to the replacement of the engine mounts and once after. There was no documentary evidence of these repairs. Volvo Penta’s examination of the engine at its Gothenburg factory identified the following:
● Heavy carbon deposits on the fuel injector nozzles, cylinder head inlet valves (Figure 24) and number four piston.
● Number four piston had suffered impact damage with the cylinder head and had a fracture at 90° to its gudgeon pin that extended approximately 75% across piston crown. Its gudgeon pin had failed and its connecting rod was bent.
● Water marks on the bore of number four cylinder liner.
● Crankshaft:
○Heat damage to number four crankpin journal (Figure 25).
○Plastic deformation and impact damage to number five main journal.
○Number five main journal bearing shells had rotated 180°; they had suffered a loss of white metal and were heavily scored and deformed. Volvo Penta perceived this to be the primary locus of the failure with number four unit suffering progressive damage as a result of oil loss.
● Heavy scoring to all main journal bearing shells (Figure 26).
● ECU not original to the engine, having been transferred from the replacement engine. The engine’s fuel injectors were examined and tested in the UK by their manufacturer, Delphi Technologies. A series of tests to assess injection performance under a range of conditions were performed using an automated test rig, which the injectors passed. A comparison with the injector’s original test results showed that there had been minimal degradation during the engine’s 2241 running hours.
48 Following Volvo Penta’s examinations, MAIB transported the engine to The Test House (TTH) laboratory in Cambridge for metallurgical testing. Section 8 of TTH’s examination report, Conclusions, Discussion and Opinion, included the following:
●Carbonaceous deposits were identified on the inlet valves indicating poor combustion.
●Fractured cylinder liner No.4 showed graphitisation on the bore surface. Graphitisation is a corrosion mechanism in cast irons and occurs when the cast iron surface is exposed to medium acids or soft water. This graphitisation indicates an ingress of water into cylinder No.4 (Figure 27).
●The SEM26 examination identified the brittle nature of the fracture surface and suggests that the crankcase, cylinder liner and piston failed due to a sudden, impact type loading.
●The microstructural examination of the cap end shell bearings did identify regions of scoring. 26 Scanning electron microscope (SEM). Figure 24: Event 4 – carbon deposits on cylinder head valves Carbon deposits on fuel injector nozzlesCarbon deposits on cylinder head inlet valves
49 Figure 25: Event 4 – heat damage to number four crankpin journal Close-up of crankpin journal showing scoring and variation in colour Figure 26: Event 4 – scoring of main journal bearing shells View looking down at five main bearing shells showing scoring inside
50
Figure 27: Event 4 – graphitisation marks on number four cylinder liner Graphitisation marks show as black specks along cylinder liner Graphitisation marks Based on TTH’s examination results, various engine components, including the number four liner with graphitisation marks, main bearings with ingrained debris and the oil filter, were re-examined by Volvo Penta in Gothenburg. The results included: ● The liner graphitisation was identified as corrosion caused by an unidentified liquid corrosive media, which included a small sulphur peak in the energy dispersive x-ray spectroscopy analysis. ● The main bearings ingrained debris particles included main bearing material but also some unexplained elements, including silicon, calcium, aluminium, zinc and phosphorus, and a silicon oxide considered likely to be sand. Volvo Penta’s concluding summary stated that: ●It is currently being considered that oil contamination also contributed to the gradual breakdown of the main bearings as indicated in the oil analysis from May 2018, leading to #5 main bearing turning. ●The SEM analysis of the bearing shells and the oil filter contents confirms that wear particles were present. Additionally, there are some contaminant particles which are not related to the engine were found embedded within the main bearing shells. [sic]
51 1.14.6 Wight Sky main engine number four catastrophic failure 14 December 2018 (Event 5) On 22 November 2018, Wight Sky’s new-build ME4 was installed using new flexible mounts. Volvo Penta’s examination of the engine at its facility in Gothenburg identified that the big end bearing caps on number four and number five connecting rods had been transposed during assembly at Volvo Penta’s factory. This procedural error was identified by comparing the connecting rod serial numbers. Other engines, built at around the same time and by the same technician, were examined and no further assembly errors were found. Other observations made by Volvo Penta during its examination of the engine included:
● There was minimal heat damage sustained to the crankpin journal and the bearing shells.
● Number four piston had made hard contact with the cylinder head and valves, thus causing rocker gear damage.
● Number four big end cap bolts had failed under tension.
● Number five big end cap bolts torque was below the specified range.
● Number five big end connecting rod and cap mating faces showed clear signs of fretting.
● Carbon build-up behind the inlet valves.
● ECU not original, and had been transferred from the replaced engine.
● Injector codes in the ECU not updated to the new codes for the new injectors. 1.15 OTHER TESTS AND EXAMINATIONS 1.15.1 Engine alignment and vibration analysis In December 2018, Volvo Penta conducted vibration measurements on board Wight Sky. This involved attaching sensors on ME2 and ME3 and conducting five return trips to the Isle of Wight during normal ferry operations. For each engine, a controlled torque increase from low to high over a 30-second period was completed at the three engine propulsion power speeds: 960, 1360 and 1800rpm. Torsional vibration measurements were noted for each in lieu of engine loads, which could not be measured. The trials team analysed the vibration data and concluded that, outside of the critical range, they indicated potential engine misalignment or uneven belt tensions in the belt drive assembly. RKM used a straight edge and dial gauge indicator to check engine alignment after the installation of new and overhauled engines. Checks carried out by the same method during the December 2018 trials showed that both angular and axial displacements were well within the limits on the flexible couplings on all engines.
52 1.15.2 Flexible mounts and testing The engines were installed on four flexible mounts (Figure 13); a further two mounts were used to secure the fluid clutch couplings. Volvo Penta’s installation manual for its D5 to D16 engine range contained drawings that illustrated the correct order of installation. The manual stated: Before adjustments can be made, the engine must rest on the rubber mounts for at least twelve hours but preferably more than two days. Overhauled or replacement engines on board the Wightlink vessels were commonly installed and connected over a period of several days. Volvo Penta did not provide any guidance on when engine mounts should be changed. In March 2019, MAIB contracted Element Materials Technology Hitchin Limited to test and analyse several engine mounts of different ages. These included:
● The original mounts for Wight Sky’s ME2, which had been in place for about 10 years and had accumulated about 22500 running hours;
● The new mounts fitted to Wight Sky’s ME2 in March 2018, which had accumulated about 800 running hours; and
● A new unused mount. The laboratory examination and testing involved:
● Mechanical stiffness characterisation;
● Sectioning and flaw/damage characterisation; and
● Assessment of the extent of environmental elastomer ageing. The examinations identified that one of ME2’s new mounts (800 running hours) was assembled incorrectly during manufacture. The mount’s rubber element void spaces had not been correctly aligned (Figure 28). This resulted in increased vertical loading being applied to solid sections of the rubber element, causing a 60% increase in stiffness. The laboratory test report concluded that the other mounts were undamaged and serviceable. 1.15.3 Subsequent planned maintenance engine examinations In 2019, Wightlink contracted a different Volvo Penta Centre dealer to manage and perform its planned maintenance work on the W-Class D16 MH engines. During the new dealer’s initial examination of three engines it identified a number of issues, including:
● Two engines with debri s in the sump pan and one with debris in the lubricating oil pump strainer. The debris included old cable ties (Figure 29).
53 Figure 28: Engine flexible mount rubber bush misalignment Close-up of misaliged bushes in one of the 800 hour mounts, the degree of misalignments are indicated by red lines Close-up of correct alignment of bushes in one of the 800 hour mounts, indicated by straight vertical red lines Misalignment of bushes in one of the 800-hour mounts Correct alignment
54
Figure 29: Debris found in engine sump pan and lubricating oil strainer Debris found in sump pan/oil pump strainer including old cable ties ● Liner sealing ring hardening, resulting in the seal not making contact for the full circumference of the liner; block erosion/corrosion in an area that should be dry (Figure 30) and pitting/erosion of the liner at the liner seal groove. ● Two engines with cavitation erosion to the HT coolant circulation pump, considered to be because of low system pressure and/or incorrect coolant concentrations (Figure 31). ● Two engines with pockets of corrosion in cylinder heads (Figure 32) thought to indicate airlocks and a failure of deaeration system pipework. 1.16 CLASSIFICATION SOCIETY OVERSIGHT Classification societies establish and maintain technical standards for the design, construction and survey of marine vessels and offshore structures. Classification society surveyors inspect ships at all stages of their development and operation to make sure the design, components and machinery are developed and maintained in accordance with the classification society’s rules. The process includes inspection of engines, shipboard pumps and other critical machinery. The D16 MH engine was type approved by LR and many of the engine’s components were listed as specific items on which the classification was based (class items). These included the cylinders, pistons, connecting rods, bearings and turbochargers.
55 Figure 30: Erosion to engine block in line with and below the upper of the two lower cylinder liner sealsPitting and erosion of cylinder liner seal groove with an area of damage circled Figure 31: Cavitation erosion of high temperature cooling water pump Impeller Pump casing cavitation damage
56 Figure 32: Corrosion in upper cylinder head from air pocket Corrosion within cylinder head coolant space LR’s Rules and Regulations for the Classification of Ships Part 1 – Regulations, Chapter 2 Classification Regulations, Section 1 Conditions for Classification stated that damage or breakdown of a vessel’s main engine could invalidate the conditions of class and so should be reported to LR without delay. It became evident during the investigation that eight incidents requiring the removal of W-Class MEs for repair and overhaul ashore were not reported to LR by Wightlink. These incidents were primarily related to liner failures but also included other issues such as turbocharger replacement. The alarm and shutdown devices fitted to the W-Class D16 MH engines were also LR approved. They were tested as required by ship’s staff and RKM technicians and the tests were witnessed by an LR surveyor as required. The derate function was not verified during these checks. The propulsion drive train was assessed and torsional vibration calculations on the shafts submitted to LR as part of the approval process. The calculations were based on one engine driving the propeller shaft via the belt drive at the design operating speed of 1800rpm.
57 1.17 SAFETY MANAGEMENT Wightlink’s ferry operations were limited to UK internal waters. This meant that Wightlink was required to operate its W-Class ferries in accordance with the Safety Management Code for Domestic Passenger Vessels27. Despite this, Wightlink voluntarily undertook to comply with the more stringent requirements set out in the International Safety Management Code (ISM Code). The purpose of the ISM Code is to provide an international standard for the safe management and operation of ships, and for pollution prevention. The ISM Code requires the company to establish and maintain a safety management system (SMS). It defines the necessary organisational structure, responsibilities, procedures, processes and resources. As required under the ISM Code, the MCA conducted audits of Wightlink’s SMS. Section 1.2 of the ISM Code states that the company should:
●Provide for safe practices in ship operation and a safe working environment;
●Assess all identified risks to its ships, personnel and the environment and establish appropriate safeguards; and
●Continuously improve safety management skills of personnel ashore and aboard ships, including preparing for emergencies related both to safety and environmental protection. Section 10 of the ISM Code sets out the maintenance management requirements for vessels and their equipment. It requires vessel owners and operators to establish procedures to ensure that the vessel is maintained in conformity with the provisions of any relevant rules and regulations and with any additional requirements it might set. In meeting these requirements, the company should ensure that:
●Inspections are held at appropriate intervals;
●Any non-conformity is reported, with its possible cause, if known;
●Appropriate corrective action is taken; and
●Records of these activities are maintained. Wightlink’s electronic integrated management system provided the platform for its safety and maintenance management systems. Wightlink managed a programme of internal audits to verify that its safety and environmental protection practices complied with the company’s SMS. These audits were conducted by trained personnel at intervals of not more than 12 months, with the possibility of further audits as necessary. 27 The Merchant Shipping (Domestic Passenger Ships) (Safety Management Code) Regulations came into force on 1 November 2001. The Regulations apply to all domestic passenger ships, except those domestic operators required to comply with the ISM Code.
58 The Volvo Penta’s operating instructions, maintenance manuals and safety bulletins had not been incorporated into Wightlink’s maintenance management system. And Wightlink’s operating procedures and maintenance records had not been audited against the engine manufacturer’s requirements. 1.17.1 Company meetings Board of Directors meetings were held about once a month and the agenda included: reviews of identified safety, health and environmental issues; outcomes of audits undertaken by the MCA; and accident and incident reports submitted to MAIB or the Health and Safety Executive. In addition, Health, Safety and Environmental committee meetings were held at 6-monthly intervals, at which the company’s overall health, safety and environmental management performance was discussed. No discussions about the longer term ongoing ME maintenance management issues on board the W-Class ferries were recorded in the minutes for either the Board of Directors or Health, Safety and Environmental Committee meetings held between 2017 and 2019. One item recorded in the July 2018 Board of Directors meeting referred to a Wight Sky engine failure as being due to …a similar lubrication issue on another of our Volvo engines…, with a resolution via an insurance claim. Other items relating to the engines focused on the catastrophic failures, the associated injury to the engineer, the subsequent revised operating procedures implemented by Wightlink and the respective external investigations. No reference was made to any internal investigations to understand and resolve any underlying engine problems that had caused these failures. 1.18 PREVIOUS ACCIDENTS 1.18.1 Windcat 8 – catastrophic engine failure On 7 September 2017, the 15.87m crew transfer vessel, Windcat 8, was on passage to Grimsby, UK, from the Lynn Wind Farm in the North Sea with two crew and eight windfarm technicians on board. Shortly after setting off, the vessel’s port Volvo Penta D16 MH engine suffered catastrophic failure and caught fire (MAIB report 1/201828). The fire was quickly extinguished and the passengers transferred onto another crew transfer vessel, Windcat 31. Windcat 8 was towed back to port; there was no pollution and no injuries. The MAIB’s investigation identified that the catastrophic damage to Windcat 8’s engine was caused by the overheating and failure of a connecting rod big end bearing shell, which resulted in the connecting rod assembly releasing and penetrating the engine crankcase. The crankshaft crankpin suffered plastic deformation, which clearly indicated a loss of lubrication oil supply. 1.18.2 St Helen – mezzanine deck collapse On 18 July 2014, the starboard forward mezzanine deck on board Wightlink’s ro-ro passenger ferry St Helen partially collapsed (MAIB report 1/201629). St Helen was berthed at the Fishbourne ferry terminal, Isle of Wight and the mezzanine deck 28 https://www.gov.uk/maib-reports/catastrophic-engine-failure-resulting-in-a-fire-on-crew-transfer-vessel- windcat-8 29 https://www.gov.uk/maib-reports/collapse-of-a-mezzanine-deck-on-board-ro-ro-passenger-ferry-st-helen
59 was being lowered in preparation for the disembarkation of the cars parked on it. One crewman and several passengers were injured but none remained in hospital overnight. The MAIB investigation identified weaknesses in the way that Wightlink had managed the day-to-day maintenance of its vessels and, in particular, its mezzanine decks. The investigation report included recommendations to Wightlink to:
●Review and, as necessary, improve its safety management system to ensure the company:
○Acts promptly in response to nonconformities affecting important and critical equipment on board its vessels.
○Applies a proactive response to the management of observations and deficiencies identified during the thorough examination of its vessels’ lifting equipment.
○Notifies the relevant authority in the event of damage to a vessel that requires structural repair. The MCA was recommended to:
●Ensure its audit inspections of Wightlink vessels provide specific focus on the effectiveness of the company’s maintenance procedures. These recommendations were closed after the MCA reported Wightlink as having implemented the appropriate actions. These actions included the introduction of a company-wide database that monitored non-conformities and sent warnings to the company’s designated person ashore and senior managers if the due date was about to expire.
60 SECTION 2 – ANALYSIS 2.1 AIM The purpose of the analysis is to determine the contributory causes and circumstances of the accident as a basis for making recommendations to prevent similar accidents occurring in the future. 2.2 OVERVIEW This investigation was opened on 26 August 2018, when Wight Sky’s ME2 suffered a catastrophic failure. The engine was a new build and replaced an engine that had suffered a similar failure 11 months earlier. On the 14 December 2018, Wight Sky’s ME4, another new-build engine that had been installed a month earlier, suffered what appeared to be a similar catastrophic failure. The scope of the investigation was widened to cover both accidents. In this section of the report, the causes of Wight Sky’s ME2 and ME4 failures will be analysed and the underlying factors that contributed to them, and a series of other main engine failures on board Wightlink’s W-Class ferries, will be discussed. These include maintenance management, engine condition monitoring, maintenance standards and quality control, main propulsion system configuration and vessel operating profile. 2.3 WIGHT SKY CATASTROPHIC ENGINE FAILURES 2.3.1 Number two main engine failure August 2018 (Event 4) On 26 August 2018, Wight Sky’s ME2 failed catastrophically as the ferry was about to enter the Lymington River. The engine was running at full speed (1800rpm) and was driving the forward VSP unit in parallel with ME1 when its ECU detected a loss of lubricating oil pressure and initiated an engine shutdown. 63 seconds later, the engine’s number four connecting rod and piston assembly was thrown out of the crankcase into the engine room. The engine had accumulated 2241 running hours and had been installed 11 months earlier as a new build replacement for an engine that had suffered a similar catastrophic failure (Event 1). Evidence was found of water ingress and impact loading damage in number four cylinder. The damage could potentially have been the result of coolant leakage leading to the cylinder becoming hydraulically locked at the time of failure. However, like Wight Sky’s previous ME2 failure, the engine’s number five main journal bearing shells were found to have turned in their housing. This would have blocked the lubricating oil supply to the main journal bearing and number four connecting rod crankpin. Coupled with the extent of the heat and wear damage caused to the crankshaft journals, this clearly indicated that the engine failed due to a sudden loss of lubricating oil. The circumstances that led to the main journal bearing shells turning through 180° were less clear and several factors that could have contributed to this were examined. These included:
● The sudden or gradual loss of lubrication oil supply;
● High operating loads due to poor combustion and engine operating profile;
61
● Excessive heat due to engine misalignment; and
● Vibration. No material defects that could have caused a sudden loss of lubricating oil pressure were found with the engine’s lubricating oil pump, filter arrangements and supply circuit. Wear particles were found embedded in the bearing shells and filter elements. The investigation report (MAIB Report 14/2018) into the previous ME2 failure concluded that the most likely cause was a loss of lubricating oil supply due to the presence of debris in the engine’s oil channels. The debris was attributed to poor hygiene standards being applied when the engine was rebuilt in RKM’s workshop. However, the replacement engine was a new build and therefore the likelihood of debris being introduced locally was extremely low. Further analysis of debris found in the oilways and bearing shells of both failed ME2 engines (Events 1 and 4) identified the presence of silicon dioxide (silica sand) and oxides of cadmium and aluminium. Silica sand is commonly used in the engine component casting process and further examination of the particles found indicated that they were consistent in size (approximately 190µm) with casting sand. The oxides of cadmium and aluminium are abrasive components commonly used in crankshaft polishing and their presence in the case of Event 1 was probably the result of ineffective cleaning of the oilways after polishing. It is possible that the build-up of silica sand and other particles embedded in the bearing material caused the shell bearings to turn. It is also possible that poor fuel combustion, engine misalignment and high levels of vibration could have contributed to the eventual failure of the engine. Heavy carbon deposits were found on the injector nozzles, cylinder head inlet valves and number four piston crown, and the engine mounts had been misaligned. However, oil sample test results and wear particles found in the oil filters and embedded in the shell bearing surfaces suggested that contaminated lubricating oil was a significant factor and could have caused the gradual breakdown of the main bearings and sudden failure of the engine. 2.3.2 Number four main engine failure December 2018 (Event 5) On 14 December 2018, Wight Sky’s ME4 failed catastrophically after 389 running hours. The ferry was about to berth alongside at Wightlink’s Lymington Harbour ferry terminal and the engine was running at its intermediate speed setting of 1360rpm and independently driving the aft VSP unit. Like Wight Sky’s ME2 failures, the engine’s number four connecting rod was thrown from the crankcase into the engine room. Although the consequences of the ME4 failure had similarities with Wight Sky’s previous ME2 failures, the event was found to be the direct result of an assembly error at Volvo Penta’s factory in Sweden. The engine’s number four and five connecting rod big end bearing caps had been inadvertently transposed during the engine’s assembly. This meant that the mating surface between the connecting rod and its cap (Figure 8) did not match. This would have significantly reduced the amount of metal-to-metal contact and increased the risk of fretting wear due to the oscillating forces imposed during engine running. This in turn would have progressively reduced the tension in the big end bolts and rapidly accelerated both the securing arrangement loosening and fatigue failure processes.
62 The engine build technician that assembled Wight Sky’s ME4 was an experienced Volvo Penta technician who had performed the task of installing the piston and connecting rod assemblies many times. It was evident that he must have made a simple skill-based error, probably due to a lapse in concentration or some form of distraction. Volvo Penta’s internal investigation was unable to determine why the technician made such a basic error. However, the engine manufacturer’s investigation identified that the serial numbers on the connecting rods and caps were not routinely checked to ensure that they matched following assembly. To mitigate the risk of similar errors, Volvo Penta introduced an improved method of identifying and matching the connecting rods into its production process. 2.4 OTHER WIGHT CLASS ENGINE FAILURES 2.4.1 General failure rate The W-Class vessels began to suffer cylinder liner and engine block cavitation erosion problems within a year of being brought into service in 2009. Of the 26 engine failures between 2010 and 2018 listed in Tables 1, 2, and 3, 12 were attributed to cylinder liner failures due to pitting. Between 2015 and 2018, 12 engines suffered catastrophic failures or required rebuilds due to mechanical issues. The three catastrophic failures on board Wight Sky and two on board Wight Light detailed in this report all occurred within a 15-month period and were indicative of escalating maintenance and management shortcomings. Catastrophic engine failures present a real danger to vessels, those on board and the environment because they can cause loss of propulsion control, major engine room fires and serious injuries. These types of failures are typically the direct result of inadequate lubrication, overheating, abnormal combustion or component failure. Inadequate lubrication was identified as the direct cause for four of the five failed engines examined during the investigation. However, the individual circumstances that led to the loss of lubricating oil supply differed in each case. Nevertheless, it was clear that weaknesses in the management of maintenance, standards of overhaul, quality control, technical oversight, propulsion system design and configuration, and the vessels’ operating profile all contributed to the high engine failure rate seen on Wightlink’s W-Class ferries. 2.4.2 Wight Light number one main engine failure February 2018 (Event 2) On 2 February 2018, Wight Light’s ME1 suffered a crankshaft main journal bearing seizure 700 running hours after RKM had overhauled the engine. Subsequent examination by Volvo Penta engineers identified that the crankshaft’s main journal bearing cap numbers one and seven had been transposed during overhaul. During manufacture, the engines are line-bored to ensure alignment of the crankshaft and bearings and, like the connecting rod big end bearing caps, the main journal bearing caps are matched and should not be interchanged. Volvo Penta concluded that the transposition of the number one and number seven bearing caps resulted in a misalignment, which led to overheating and eventual rotation of number seven journal bearing shell. The rotation of the shell would have blocked the oil feed to the crankshaft’s main journal and number six crankpin journal, causing the engine to seize.
63 2.4.3 Wight Light number two main engine failure August 2018 (Event 3) On 3 August 2018, Wight Light’s ME2 was stopped because it was emitting excessive amounts of white smoke from its exhaust and generating abnormal levels of noise. On 14 August, the engine was returning to service after RKM had fitted an overhauled set of injectors and had been running for less than 5 minutes before the problems were detected. When the engine’s cylinder head block was removed, the RKM service engineer discovered a melted number six piston crown and liner scoring to several other units (Figure 23). High exhaust temperatures and similar levels of white exhaust smoke earlier in the month had alerted the ferry’s engineers to the fact that the engine had been running on only five cylinders; a fuel injector failure was thought to be the cause of the problem. The engine had suffered fuel injection issues a year earlier and its lubricating oil was replaced due to fuel contamination 6 days before the accident. The symptoms observed at the beginning of the month could have been the result of injector issues, but there were other possible causes. The piston manufacturer concluded that the melted crown was clearly indicative of abnormal combustion, but explained that the abnormal combustion could have been linked to oil carry over resulting from piston ring damage. Contamination of the engine’s lubricating oil by both diesel fuel and coolant was probably the most significant underlying factor that contributed to the engine failure. Contaminated oil would have led to piston ring wear, allowing oil carry over with subsequent poor combustion followed by piston overheating and melting. This was supported by the damage noted in Volvo Penta’s examination report and the reports from both the piston and piston ring manufacturers. A thorough investigation into the earlier problems and the consequences of the oil contamination would have reduced the risk of major damage to the engine and the dangers associated with a catastrophic failure. 2.5 MANAGEMENT OF MAINTENANCE 2.5.1 Wightlink maintenance management system Wightlink’s SMS complied with the requirements of the ISM Code and was approved and audited by the MCA. Maintenance management is not only an essential aspect of engineering good practice, but also a requirement of the ISM Code. Under the ISM Code, machinery had to be inspected at regular intervals and any non- conformities had to be reported and investigated. Subsequent maintenance and repairs also had to be recorded. Wightlink used an integrated computer-based platform to help manage and record planned maintenance tasks and defect repairs. The system had recently been introduced to address the ferry operator’s problems with its previous, largely paper-based, system (see 1.18.2). The roll out of the new electronic system had been problematic and it was apparent that ME maintenance was not being managed effectively. Of note:
● Maintenance schedules and guidance provided in service bulletins were not always fully followed.
● Some repairs were not performed in accordance with the engine manufacturer’s instructions.
64
● Maintenance and repair activities were not being properly recorded.
● Oil and coolant condition monitoring was ineffective.
● Communication with RKM, Volvo Penta and LR was inconsistent. High-performance, high-speed engines such as Volvo Penta’s D16 MH engine require deep technical knowledge and special tooling to be maintained effectively. Volvo Penta recommended that all but the most basic of inspection tasks be undertaken by its approved dealers. The routine planned maintenance schedules for the engines was set out by Volvo Penta in its service protocol (Table 5). The intervals between intrusive maintenance work such as injector, cylinder head, piston and main bearing overhauls were largely dependent on through-life condition monitoring results and local engine operating conditions. Many of Wightlink’s engineers were experienced and had worked for the company for many years. Their primary role was to operate and monitor the vessels’ machinery. Most engineers moved at regular intervals from vessel to vessel and, although these were identical, it could result in a loss of vessel ownership for maintenance management responsibilities. Wightlink understood this and its introduction of survey chief engineers was intended to provide a degree of vessel-specific continuity and ownership. Unfortunately, the rapid changes of Wightlink’s shore-based technical staff between 2016 and 2018, coupled with the demands of commissioning a new-build vessel, adversely affected the proactive impact of the new role. Consequently, an increasingly reactive approach was taken towards the management of routine maintenance and defect rectification. Furthermore, the engineers’ lack of understanding and application of the company’s new electronic integrated management system meant that many maintenance tasks were not properly recorded. 2.5.2 Service bulletins Volvo Penta issued service bulletins to promulgate information about various technical issues, engine modifications, software upgrades or maintenance management improvements. These were issued to the dealer network but not the engine owners as owners were not expected to maintain their engines beyond conducting basic inspections and monitoring operating conditions. RKM incorporated the guidance contained in relevant service bulletins into any work it completed on Wightlink’s engines. However, as it was not contracted to provide through-life support to Wightlink, RKM did not pass on relevant bulletins or make recommendations to Wightlink based on their content. As a result, Wightlink was not aware of several relevant bulletins, particularly those containing maintenance or inspection advice for dealers. An example of an issue raised in service bulletins that was not actioned includes the requirement to halve the fuel injector replacement intervals on vessels using marine distillate fuels.
65 2.5.3 Through-life maintenance support Volvo Penta recommended Wightlink to use RKM for its maintenance, repair, and warranty work. Wightlink followed the engine manufacturer’s recommendation, but chose to contract the Volvo Penta Centre on a job-by-job basis rather than putting in place a long-term service agreement. It was evident that communication between Wightlink, RKM and Volvo Penta was sporadic and this adversely affected the ferry operator’s understanding of how best to operate and maintain its engines. This was apparent when an early opportunity to address cylinder liner erosion issues was lost because a Volvo Penta service request was closed out before ensuring the problem had been resolved. Had RKM been awarded a long-term contract, the authorised Volvo Penta Centre could have provided a higher level of support to Wightlink and taken a more proactive approach to the overall maintenance management of its engines. A long-term agreement for the through-life maintenance and support of the D16 MH engines would undoubtedly have resulted in increased levels of communication, better record-keeping, improved condition monitoring and more effective trend analysis and defect diagnostics; all of which would have improved engine performance and reduced the risk of catastrophic engine failures. 2.5.4 Safety management system non-conformities The ISM Code set out the maintenance management requirements for vessels and their equipment. Vessel owners and operators were required to establish procedures to ensure that the vessel is maintained in conformity with the provisions of any relevant rules and regulations. To help achieve this Wightlink undertook regular internal audits and raised non-conformities if the SMS requirements were unmet. The W-Class propulsion units could each be driven by one of two MEs and therefore had a high degree of redundancy, enabling the vessels to operate on three engines, or two in an emergency. Because of this, Wightlink did not consider the loss of a single ME to be critical to the retention of propulsion control and did not raise a loss of critical equipment or SMS non-conformities for such events. This meant that many of the engine failures were not brought to the attention of the company’s board of directors or properly scrutinised by the safety management team. Instead, engines were repaired or replaced and the vessels resumed operation without a clear understanding of why the failure had occurred or what actions might be introduced to prevent a recurrence. The series of earlier engine failures did not initially lead to any serious negative outcomes. However, they were precursors to the highly dangerous, catastrophic failures that followed. Had the early failures been investigated under the SMS, it is possible that the subsequent catastrophic failures could have been avoided, along with the associated fires and injury to a crew member.
66 2.6 ENGINE CONDITION MONITORING 2.6.1 Engine performance diagnostics Each W-Class D16 MH engine was supplied with a Volvo Penta ECU that monitored and logged the engine status and provided automatic shutdown protection. The ECUs also provided engine performance readings and engine sensor signals to local alarm panels in the engine rooms and to data logging and machinery monitoring systems in the MMR and on the bridge. The Kongsberg machinery data logging system provided time-stamped alarm information. The ECUs were mounted on the engines at build and were intended to remain paired with the engine throughout its lifecycle. RKM had found that the time taken to download software upgrades received from Volvo Penta had a knock-on effect to the reinstatement of the new engines. To mitigate this, it had become RKM’s practice to remove the ECU from the new engine and replace it with one taken from the old engine. This practice saved time but meant that the ECU did not have the most recent software updates and, because the recorded alarms were not time stamped, it was not possible to distinguish between alarms logged for the old and the new engine. This adversely affected the ability to interrogate an engine’s alarm history and diagnose technical problems. 2.6.2 Lubricating oil quality and testing Volvo Penta’s service protocol recommended the replacement of engine lubricating oil at 500 running hours or after 12 months, whichever occurred first. Volvo Penta also advised that the replacement intervals might need to be significantly reduced based on the fuel burnt and recommended that the task be carried out by its service centre technicians. Initially, Wightlink replaced the engine oil after 400 running hours but had gradually extended this to 800 running hours based on the results of periodic oil sample testing. Regular testing of an engine’s oil condition is vital to identify if the oil is still serviceable and to enable the early identification and resolution of engine problems. Engine manufacturers will usually advise a condition monitoring schedule, but this can be amended by the vessel operator dependent on operational and other circumstances. The more regular the testing, the more accurate the trend analysis, enabling a better understanding of rate of deterioration of the oil and wear on the engine components. The oil renewal and maintenance schedules can then be adapted accordingly. The early oil sample test results for the W-Class D16 MH engines provided a mixed picture. Some showed good oil quality while others identified a variety of problems normally associated with contamination and wear. Nevertheless, in discussion with RKM, Wightlink technical staff decided that the results were good enough to extend the oil replacement hours. These were raised in two stages during 2013: first to 600 hours and then 800 hours. However, there was no in-service oil sampling before the oil changes, record-keeping was sporadic and the running hours between renewals varied considerably. While the oil replacement running hours were being increased, the engines were failing due to liner corrosion leading to coolant ingress into the engine sump. Had the frequency of testing been increased at this time it would have been possible to
67 identify engines that were suffering from internal coolant leakage, potentially before the resultant contamination of the lubricating oil caused major damage. Wightlink did not increase the frequency of sampling during this period and relied on the samples taken at the increased oil replacement hours. In the event of a poor test result, a further sample of the now freshly renewed oil would be taken to confirm the first result. Invariably, as the oil and oil filter had only recently been changed it returned a better result and no further investigation into the cause of the previous poor result took place. This practice continued after the issue of a service bulletin in 2015, which clearly stated that where oil analysis showed contamination further analysis should be performed at intervals of 100 running hours. Another factor likely to have reduced the effectiveness of the oil analysis process was poor labelling of the oil sample bottles by ships’ engineers. The testing process required accurate labelling to ensure that the results were assessed against the correct criteria for the engine and oil being tested. Insufficient information on the labels led to samples being assessed against a standard criterion as opposed to the more stringent criteria developed by Volvo Penta to suit the high-performance nature of these engines. Consequently, some test results indicated that oil quality was satisfactory when they did not meet the more stringent criteria set by Volvo Penta. Despite this issue being recognised by Wightlink’s technical staff ashore, poor labelling still occurred during the later engine failure incidents, showing a lack of understanding of the value of oil condition monitoring throughout Wightlink. The condition of the engine oil, which can provide crucial early indication of engine problems, was improperly monitored. The intervals between oil and filter changes had been extended but the periodicity of oil sample analysis was not increased and many samples were tested against an inferior standard to that stipulated by the engine manufacturer. This meant lost opportunities to identify and diagnose engine problems early and therefore avoid catastrophic failures. 2.6.3 Engine coolant High-performance, high-speed engines, such as those fitted to the W-Class vessels, place considerable demands on the cooling system to ensure heat is removed efficiently and erosion and corrosion of the engines’ internal metal surfaces is prevented. Consequently, the need to comply with the engine manufacturer’s specification and closely monitor the condition of the coolant is essential to the health of an engine. The ME coolant on board the W-Class ferries was outside the required specification from the outset because the water used to formulate the coolant did not meet Volvo Penta’s prescribed standard. In 2014, Volvo Penta recommended that D16 MH engines using its old green coolant change to its new yellow coolant. The new coolant provided improved protection against cavitation erosion and corrosion because it contained extra additives and had a higher boiling point. However, due to the extended cooling system and the difficulties in cleaning it, Volvo Penta recommended the green coolant remained in place and so it was not changed on the W-Class ferries. Volvo Penta’s service protocol recommended that the condition of the engine coolant be checked at 500 running hours or after 12 months, whichever occurred first. It also recommended that the coolant be replaced at 8000 running hours or after 48 months, whichever occurred first. The engine manufacturer also recommended that both tasks be carried out by its service centre technicians.
68 There were no records of the coolant on the W-Class vessels having been tested or replaced. As part of the investigation, samples of the coolant in all 12 W-Class MEs were tested and all showed signs of contamination, glycol degradation and precipitation. The failure to follow Volvo Penta’s engine coolant guidance was probably the result of a lack of knowledge due to poor communication. Had Wightlink chosen to use pre-mixed coolant from the outset, changed to the new coolant when recommended, and monitored the condition of the coolant more closely, the risk of liner failure would have reduced and the opportunity to identify underlying engine problems would have increased. 2.7 MAINTENANCE STANDARDS AND QUALITY CONTROL 2.7.1 General maintenance standards Much of the maintenance work carried out by RKM did not meet the standards set by Volvo Penta and those expected by Wightlink. Assembly errors were made during overhauls, basic levels of workshop cleanliness were not always met, engines had not been properly aligned, unapproved repairs were carried out and components were regularly switched from engine to engine. Separately, an assembly error at Volvo Penta’s factory in Sweden and the presence of casting sand particles within oilways was not identified before delivery of new engines. 2.7.2 Assembly errors Basic errors were made during the assembly of two of the five engines examined during this investigation. In both cases, these errors were considered causal to the engines’ failure. The circumstances that led to main bearing caps being transposed during the rebuild of Wight Sky’s ME1 (Event 2) at RKM’s workshop are unknown. It is also unclear why a similar assembly error occurred during Wight Sky’s ME4 build (Event 5) when the big end caps were transposed at Volvo Penta’s factory in Sweden. However, it is apparent that for both events the checks in place to ensure the identification and correction of such errors were insufficient. 2.7.3 Debris in the rotating assembly During the close examinations of the three Wight Sky and two Wight Light failed engines, and other engines overhauled by RKM, various types of debris were discovered in oilways, bearings, filters and sumps. These ranged from cable ties to sand particles. The particles that made up the debris found within the engines’ oil galleries included materials such as cadmium oxide and aluminium oxide. These are not compounds associated with engine operation, they are the main abrasive components used in crankshaft polishing. Therefore, it was apparent that proper mechanical cleaning of the oilways was not completed prior to installation.
69 Other particles discovered within the rotating assembly, including casting sand and carbon, were significantly larger than the crankshaft big end bearing clearances through which the oil in the rotating assembly must pass. Therefore, they cannot have entered the assembly with the engine oil during operation and must have been present at build (sand) and/or introduced during overhaul (carbon). 2.7.4 Engine alignment and vibration The new engine fitted on board Wight Sky to replace the ME2 that failed in September 2017 (Event 1) suffered significant levels of vibration during its initial 1400 running hours. The levels of vibration were sufficient to cause the engine’s air cooler steel brackets to fail. Both failed ME2 engines had been installed on old flexible mounts, two of which had been bolted to newly drilled holes in the engine bedplate. The vibration was arrested when the engine mounts were renewed and bolted to the original holes. Wightlink did not routinely renew its flexible engine mounts during major overhauls and the mounts used for ME2 were the same age and had accumulated similar running hours to those fitted to other W-Class engines. It is therefore unlikely that the condition of the flexible mounts was the main cause of the sudden and progressive increase in vibration. Excessive vibration is often caused by engine misalignment and it is likely that the repositioning of two of the mounts introduced a degree of misalignment. RKM had drilled new holes for the flexible mounts in ME2’s bedplate to help facilitate alignment at the free end of the engine. It is unclear why this had to be done, but such action should not have been undertaken without consulting with Wightlink, Volvo Penta and LR. Engine misalignment can also cause bearing temperature increases and premature bearing, coupling, or driveshaft failures. Although the excessive vibration stopped when the flexible mounts were renewed and the original bolt holes used, the extent of any internal damage caused during the engine’s first 1400 running hours is unknown. However, given the extent of the external damage caused, it is likely that misalignment and vibration contributed in some way to the eventual failure. Vibration was less likely to have been a factor in the first ME2 failure as the engine had only run for 5.5 hours and no reports of excessive vibration were made. 2.7.5 Reuse of engine components and unauthorised repairs The reuse of components between engines was predominantly done at the behest of Wightlink’s technical department for cost saving reasons and to expedite repairs. However, few records exist regarding these changes and the W-Class chief engineers were not made aware of them. RKM, with the agreement of Wightlink and LR, performed one of the two Belzona repairs to the engine blocks. As the engine was out of warranty, it was Wightlink’s decision as to whether a damaged block be repaired or replaced. However, Volvo Penta were not consulted and therefore remained unaware of the continued issues with erosion at the liner/block interface.
70 If consulted, Volvo Penta would not have approved the routine reuse of old and/ or repaired engine components during major engine overhauls; similarly, it would not have sanctioned the Belzona repairs carried out on the W-Class engine blocks. If the engine manufacturer had been consulted about the engine block repairs, it would have had a greater understanding of the ongoing cooling system issues and this would almost certainly have prompted higher level technical investigations. 2.7.6 Quality management RKM’s quality management system was ISO 9001 accredited and subject to annual external audits. RKM was also audited by Volvo Penta and its work on board the W-Class ferries was overseen by Wightlink’s technical staff and, where appropriate, approved by LR. It was apparent that the internal and external audit processes and the technical oversight of the work undertaken by RKM did not deliver the required level of quality assurance. The investigation also identified assembly line quality control issues at Volvo Penta’s factory in Sweden. Many of the shortcomings discussed in this section of the report should have been identified during RKM’s internal audit process and some could have been identified during Volvo Penta’s authorised dealership audits and inspections; had they been, the likelihood of catastrophic engine failures would have been significantly reduced. 2.8 ENGINE CONTROL, MONITORING AND PROTECTION SYSTEM The ECU included a standalone hard-wired shutdown unit that was designed to declutch and stop the engine during critical alarm conditions. An engine shutdown sequence was initiated at least 1 minute prior to both Wight Sky ME2 catastrophic engine failures (Events 1 and 4). Both engines were running in parallel with ME1 when the shutdown signal was given. Tests conducted after the second ME2 failure indicated that the stoppage of an engine, when clutched in and running in parallel with a second engine following an ‘emergency stop’ shutdown, was relatively slow as the engine was driven by the running engine for up to a minute before declutching was completed. The delay in declutching the shutdown engine was governed by the time taken for oil to drain from its fluid coupling. The shutdown engine was driven by the other engine because its fuel supply had been cut off as part of the shutdown sequence. The inability to immediately declutch, and therefore stop an engine that is running in parallel with another engine when a shutdown signal is given, significantly increased the severity of engine damage and the likelihood of explosions and fires. The ECU could be programmed to provide an automatic derate function that protects the engine by reducing its power output. This function was intended to arrest gradual changes in temperature and pressure, and allow the ferry engineers time to investigate their causes, while still delivering some propulsion power to the bridge. However, due to an internal Volvo Penta process error, the ECU software for the 478kW D16 MH engine had never been upgraded to provide derate protection.
71 Given the circumstances of the catastrophic engine failures, it is unlikely that the provision of a derate function would have prevented the accidents on board Wight Sky. However, the load shedding function would have provided another layer of safety critical protection and might have acted as a barrier for some of the other engine failures that previously occurred on the W-Class ferries. 2.9 COOLING WATER SYSTEM AND LINER FAILURES Cylinder liner pitting and engine block erosion issues were first diagnosed in 2010 when coolant began to seep into the engine crankcases. By 2012, half of the engines in operation had suffered from this issue. Pitting is often found in diesel engines on the exterior walls of wet cylinder liners and is a direct result of cavitation erosion. Cavitation erosion of the cylinder wall begins when vapour bubbles, generated in the coolant by liner vibration during the normal combustion cycle, form on or close to the liner wall and implode. The repeated implosion of the vapour bubbles creates enough energy to physically attack the metal surface of the liner and create pitting. If not addressed, coolant may eventually penetrate the cylinder and contaminate the oil or oil may be introduced to the coolant. The resulting oil contamination can interfere with piston ring and bearing performance, significantly elevating wear rates and increasing the risk of engine seizure. Poor fuel combustion, loose-fitting liners and failure to follow the engine manufacturer’s operating parameters can all increase the risk of cylinder liner cavitation erosion (Annex B). The use of coolant additives and pressurised cooling systems are common methods of avoiding cavitation erosion in high-speed engines. Coolant additives can form a protective coating on the metal surfaces exposed to the coolant to reduce cavitation erosion. Pressurised systems raise the boiling temperature of the coolant and therefore reduce the rate of vapour bubble formation. The D16 MH engine was designed to operate with a pressurised cooling system. However, the pressure relief caps fitted to the cooling system expansion tanks (header tanks) on board the W-Class ferries were left loose for several years. This reduced the cooling system operating pressure and therefore lowered the temperature at which the coolant would boil. This increased the likelihood of cavitation erosion. Modifications to the HT cooling pipework, such as the fitting of the T-piece and the later removal of a U-bend, were intended to resolve the perceived issues with gassing up and venting. However, no assessment of the cooling system design, components, system temperatures or flow calculations were undertaken, and the modifications were not done in a coordinated manner or assessed for their effectiveness. The modifications probably increased the risk of hot spots developing in the jacket spaces between the liners and engine block, which again would have accelerated the cavitation erosion process. The cavitation erosion problems that were clearly visible at the interface between the cylinder liners and engine blocks on board the W-Class ferries led to coolant leakage into the crankcase and contamination of the lubricating oil. This was likely to have been a major contributing factor to some of the bearing-related engine failures.
72 2.10 LUBRICATING OIL FILTER DESIGN When Volvo Penta closely examined the performance of the full-flow duplex oil filter, it discovered that at full engine speed the filter bypass valve opened slightly and allowed 10 to 20% of unfiltered oil to flow through the circuit. To resolve this, Volvo Penta issued a service bulletin advising the removal of the duplex filter changeover cock. Volvo Penta did not link any of the engine failures to the oil filter bypass valve issue. However, the circulation of up to 20% unfiltered lubricating oil significantly increased the risk of bearing wear and engine damage due to oil contamination. The arrangement also failed to meet LR rules on oil supply and 100% filtration. 2.11 FERRY OPERATING PROFILE The provision of four main propulsion engines was designed to accommodate varying propulsion system load demands and provide redundancy in case of engine failure. The W-Class D16 MH engines were originally intended to be operated at their full running speed of 1800rpm. However, this caused serious wake wash issues within the confines of the Lymington River, which was resolved by the introduction of slow (950rpm) and medium (1360rpm) speed engine settings. Volvo Penta and LR were not fully aware of the revised operating profiles. LR’s approval of the W-Class drive train was based upon the torsional vibration calculations for one engine driving the VSP unit via the belt drive at 1800rpm. Volvo Penta was aware of, and had approved, the use of the 1360rpm intermediate speed on the basis that further torsional vibration calculations be completed and provided to LR for approval. Such calculations were not performed and therefore the potential impact of the operating profile changes on the longevity of the engines or drivetrains was unknown. Volvo Penta had not approved the on-load operation of its engines at speeds below 1360rpm because the ECU automatic shutdown or derate protections were not fully active at speeds below 1200rpm. Therefore, the use of the engines on-load at 950rpm as recommended by Wightlink was contrary to Volvo Penta’s guidance and had not been approved by LR. The engine load profile for the route resulted in the engines operating at their maximum continuous rating for about 25 to 30% of each crossing. In addition, to mitigate the consequences of an engine failure, Wightlink’s masters routinely operated with two engines in parallel driving the same VSP when entering and leaving Lymington and Yarmouth. These prolonged periods of low load running introduced several potentially detrimental conditions, including reduced coolant and lubricating oil pressures and carbon build-up from poor combustion. 2.12 CLASSIFICATION SOCIETY OVERSIGHT Wight Sky and the rest of the Wightlink fleet were classed by LR. The loss or breakdown of the MEs on board the W-Class ferries should have been reported to LR without delay as such events could invalidate LR’s approvals. However, not all engine failures were reported to LR and the classification society was not fully aware of the magnitude of the problems on board the W-Class ferries.
73 Most of the engine failures discussed in this report were reported to LR; however, the investigation did identify eight that were not. This meant that on at least eight occasions LR surveyors were denied the opportunity to investigate the circumstances of an engine breakdown and provide technical oversight. The failure to report also affected the amount of historical data recorded by LR, which could have been used for trend analysis and to identify recurring issues. The D16 MH engine was type approved by LR and the provision and testing of its emergency shutdown and power reduction functions formed an integral part of the type approval process. The derate function is described in several sections of LR’s Rules, including those relating to sea trials. Therefore, it is surprising that the lack of derate protection on the W-Class engines was not identified by LR during the ferries’ new construction commissioning trials, refits and engine rebuilds. Wightlink staff did appear to be aware of the lack of derating, but this information was not passed on to LR or identified when engine shutdowns and associated safety systems were demonstrated to LR surveyors. LR’s delivery of robust classification and statutory services, as well as its ability to offer sound technical advice to Wightlink, was impacted by weak levels of communication between the engine manufacturer, its authorised service centre, and the ferry operator. Again, the weak communication was indicative of poor maintenance management. 2.13 EMERGENCY RESPONSE Wight Sky’s crew were quick to respond to both ME2 and ME4 engine failures, and their response was effective. During both incidents, the alarm was raised immediately, and the engine room water mist fire suppression systems were activated swiftly and effectively. On the ferry’s return to port, the emergency services were waiting to come on board and the passengers and their vehicles were quickly landed ashore. Engine explosions and engine room fires often result in significant damage and loss of life. The effectiveness of the response to such incidents is largely dependent to the crew’s level of emergency preparedness. The actions of crew to isolate the affected machinery spaces, activate the fixed fire suppression system and monitor the boundaries of the engine rooms, helped limit the consequences of Wight Sky’s catastrophic engine failures to mechanical damage and ferry service delays.
74 SECTION 3 – CONCLUSIONS 3.1 SAFETY ISSUES DIRECTLY CONTRIBUTING TO THE ACCIDENTS THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS
Wight Sky’s ME2 failed catastrophically due to a sudden loss of lubricating oil supply to its number five main journal bearing and number four crankpin. [2.3.1]
The oilway to the main journal and crankpin was blocked off when the bearing shells turned in their housing. Poor fuel combustion, the presence of silica sand and other abrasive particles embedded in the main bearing shells, engine misalignment, high levels of vibration, and contaminated lubricating oil might all have contributed to the event failure. [2.3.1]
Wight Sky’s ME4 failed catastrophically because of an assembly error during build at Volvo Penta’s factory in Sweden. Two of the engine’s matched connecting rod big end bearing caps had been transposed during the engine assembly process. [2.3.2]
The transposition of the bearing caps reduced the metal-to-metal contact between surfaces of the connecting rods and their bearing caps. This would have caused fretting wear between the mating faces, which would have led to loosening and rapid failure of the end cap securing bolts. [2.3.2]
Four of the five catastrophic engine failures discussed in detail in this report failed suddenly because of a loss of lubrication supply to the engines’ crankshaft journal bearings and crankpins. [2.4.1]
The operation and maintenance of Wightlink’s main engines was not being managed effectively, and many of its engineering crew were not recording tasks they had performed, or engine fluid test results on the company’s electronic integrated management system. [2.5.1]
The ability to interrogate the alarm history of an engine and the level of protections against abnormal changes in running temperatures and pressures was reduced because engine control units were moved from engine to engine and were not subject to manufacturer’s software upgrades. [2.6.1]
Opportunities to identify and diagnose engine problems early, and therefore avoid catastrophic failures, were missed because the condition of the engine lubricating oil and coolant was not closely monitored. [2.6.2] [2.6.3]
Some aspects of the maintenance work carried out by RKM did not meet the standards set by Volvo Penta and those expected by Wightlink. Assembly errors had been made during overhauls, basic levels of workshop cleanliness were not always met, engines had not been properly aligned, unapproved repairs were carried out and used components were regularly switched from engine to engine. [2.7.1]
The checks in place at both RKM’s workshop and Volvo Penta’s factory were not robust enough to identify the basic assembly errors. [2.7.2]
The debris and sand particles found in the engine sumps, oilways and bearing faces were either introduced during maintenance or not removed at build. [2.7.3]
75
Engine misalignment due to assembly error, incorrect location of engine mounts and condition of flexible mounts was likely to be a significant factor in some of the engine failures. [2.7.4]
Volvo Penta were not fully aware of the extent to which major engine components were being repaired, reused, and switched from engine to engine. [2.7.5]
Many of the sub-standard working practices discussed in this report should have been identified during RKM’s internal audit process and some could have been identified during Volvo Penta’s audits and inspections of its authorised dealerships. [2.7.6]
The emergency shutdown protection provided by the engines’ ECUs was ineffective, particularly when two engines were driving one VSP unit in parallel, because of the time it took the fluid couplings to declutch the shutdown engine. [2.8]
The inability to immediately declutch and therefore stop an engine when a shutdown signal was given significantly increased the severity of engine damage and the likelihood of explosions and fires. [2.8]
The long history of cavitation erosion and cylinder liner and engine block seal failures was likely to have been a contributory factor in some of the engine bearing failures. [2.9]
Up to 20% of the lubricating oil circulating through the engine was unfiltered because of a duplex filter bypass valve design fault. This significantly increased the risk of bearing wear and engine damage due to oil contamination. [2.10]
The standard of oversight provided by LR was adversely affected by lack of communication from Wightlink, RKM and Volvo Penta. LR were not made aware of all engine failures; it accepted repairs that had not been approved by the engine manufacturer; and had not identified the engine shutdown and protection system problems discovered following Wight Sky’s ME2 and ME4 catastrophic failures. [2.12]
The emergency response by Wight Sky’s crew was swift and effective and helped minimise the consequences of the engine failures and subsequent fires. [2.13] 3.2 SAFETY ISSUES NOT DIRECTLY CONTRIBUTING TO THE ACCIDENTS THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS
The engines on board the W-Class ferries had suffered cylinder liner erosion problems since their introduction in 2009, but the increasing number of catastrophic engine failure events between 2015 and 2018 was indicative of major maintenance management shortcomings. [2.4.1]
The Wight Light number one main engine seizure on 2 February 2018, 700 running hours after the engine had been overhauled, was probably the consequence of shell bearing rotation due to overheating caused by crankshaft misalignment. The misalignment would have been introduced when two of the crankshaft’s main journal bearing caps were transposed during overhaul. [2.4.2]
76
Another Wight Light main engine failure in August 2018 could have been avoided had earlier problems been investigated and diagnosed. [2.4.3]
Initiatives taken to address the maintenance management issues highlighted in previous MAIB reports were adversely affected by high staff turnover and the technical demands associated with the build and commissioning of a new vessel. [2.5.1]
The performance of the W-Class main engines would have been improved and the risk of failures significantly reduced had Wightlink put in place a long-term through- life maintenance and support contract with an authorised Volvo Penta Centre. Levels of communication, record-keeping, condition monitoring and technical knowledge would all have been improved. [2.5.3]
Many of the engine failures were not brought to the attention of the senior management team because the loss of one engine was not considered critical to the maintenance of propulsion control and therefore did not constitute a safety management system non-conformity. [2.5.4]
The risk of liner failure would have been decreased had Volvo Penta’s coolant standard been met and the switch to its new coolant been implemented. [2.6.3]
The engine ECUs had not been set up to provide derate or load shedding protection. This omission by Volvo Penta was identified during the investigation and was not restricted to Wightlink engines. [2.8]
Given the circumstances of the catastrophic engine failures, it is unlikely that the provision of a derate function would have prevented the accidents on board Wight Sky. [2.8]
Some aspects of the design and operation of the engines’ HT cooling systems increased the likelihood of cavitation erosion and therefore cylinder liner failure and oil contamination. [2.9]
The engine operating profiles introduced to meet the wake restrictions in the Lymington River and to mitigate the risk of losing an engine resulted in long periods of low power running, which probably had a detrimental effect on engine condition. [2.11]
77 SECTION 4 – ACTION TAKEN 4.1 MAIB ACTIONS The MAIB has issued an interim report in May 2019, informing the maritime sector of its initial findings and advising the public of the immediate safety measures imposed by Wightlink, Volvo Penta, MCA and LR to mitigate the risks of future engine failures. 4.2 ACTIONS TAKEN BY OTHER ORGANISATIONS Following this investigation Wightlink, Volvo Penta, LR and the MCA have agreed and introduced a range of measures aimed at improving the safety and reliability of the W-Class engines and propulsion system. Since December 2018, the ferries have successfully operated without any further catastrophic engine failures. Wightlink Ltd has:
● Implemented a mitigation plan, in cooperation with Volvo Penta, LR and the MCA, which enabled the W-Class ferries to continue operating while the underlying causes of the failures were resolved.
● Checked the alignment of all engines with the shaft output coupling.
● Employed a new marine superintendent and a new engineering superintendent for the Wightlink fleet, totalling three technical superintendents, and are to undergo class-approved additional professional development.
● Raised the role profile of its Director of Safety, Health and Environment with support from a deputy DPA and five Safety, Health and Environment professionals.
● Produced and promulgated a Maintenance Procedure Manual that includes reporting processes, escalation and prioritisation.
● Rewritten the process for identifying and escalating technical issues within the company SMS, including a fair and just safety culture.
● Instigated a weekly engineering and operations meeting that details incident reports, defect reports and outstanding non-conformances to members of the senior management team.
● Initiated an engineering and estates monthly company board report on major failures and technical issues and remedial action taken.
● Developed a process for individual vessels to submit end of month technical reports to the DPA for challenge and sign off.
● Contracted a different Volvo Penta Centre to undertake maintenance.
78 Lloyd’s Register has:
● Engaged with and instructed Wightlink on measures required to maintain the W-Class ferry certification through:
○Sea trials to update class certification.
○Review and revision of the planned maintenance system.
○Reiterating classification society and flag reporting requirements.
● Observed a full torsional vibration assessment of the propulsion drivetrain and recommended:
○Adjustments to the power absorbed by VSP units.
○The implementation of a barred speed range between 970-1155rpm.
○Further investigation into the flexible coupling angular displacement characteristics.
● Requested that Volvo Penta review the vibration amplitudes in comparison with those in the ISO10816-6 standard. Volvo Penta has:
● Conducted full strip down and inspection of the engines involved in failure events 1 to 5.
● Conducted a review of the engine production and assembly process and provided additional instructions and training.
● Initiated a review of maintenance manuals and following this will consider making further improvements.
● Carried out a review of the engine software release program and developed improvements in this process.
● Initiated a review and improvement of the entirety of its dealership operating standards to include additional controls, monitoring and best practice to further enhance operational standards. This will be monitored by future dealership audits and measured against key performance indicators.
● Identified the technical root cause of the oil filter bypass anomaly and undertaken to develop an improvement for release when available.
● Modified the engine alarm system to provide earlier warning of potential major failure.
● Worked with Wightlink to help implement:
○Onboard vibration testing.
○An oil replacement schedule of 400 hours.
79
○Increased oil sampling to at first 10 running hours and subsequently every 100 running hours.
○The use of Volvo Penta’s designated oil testing laboratory.
○A process to follow in response to poor oil test results.
○A coolant sample testing and analysis schedule.
○A remote alarm monitoring capability to enable Wightlink shore management and Volvo Penta oversight of engine faults.
○The installation of load measuring equipment to correlate engine load requirements against VSP pitch demand.
● Removed RK Marine as an authorised service provider. RK Marine Ltd has: Reviewed and revised its internal procedures for engine stripping and rebuilding in response to the failure of the engine in Event 2.
80 SECTION 5 – RECOMMENDATIONS Wightlink Ltd is recommended to: 2022/109 Ensure competent technical oversight of maintenance on board its vessels, through resourced procedures, so that technical issues are identified and escalated to senior management as necessary. Volvo Penta AB is recommended to: 2022/110 Identify all affected D16 MH customers to inform and resolve the identified oil filter bypass anomaly. Lloyd’s Register is recommended to: 2022/111 Assess the need to introduce within its rules and regulations the time taken to declutch a main propulsion engine from the drive shaft in the event of an emergency shutdown, to prevent the engine from being driven and increasing the risk of serious injury and damage. RK Marine Ltd is recommended to: 2022/112 Provide its customers with all manufacturers’ safety bulletins applicable to the engines in use. Safety recommendations shall in no case create a presumption of blame or liability
Marine Accident Report
FD06074 | 2023_英国_accidental-discharge-of-condensed-aerosol-fire-extinguishing-system-on-beam-trawler-resurgam-with-loss-of-1-life__2023-9-Resurgam-Annexes.pdf.pdf
分类:06_境外及港澳台调查报告 | 年份:2023 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
Annex A Extract from FPX103C fire control panel user manual
Simulation Lamps 6Vdc FIREX A FIREX B Panel
OFF ACV DCV Ohms AC Amps DC Amps DC mA Amps 10 Amps max Amps 300 mA max Volts Ohms Common Aerosol Generator resistance must be between 1.6 - 3.6 Ohms Aerosol Generator FirePro FirePro
10,000PF/1KV Disc Capacitor 1M /(1/4W) 1M /(1/4W) 10,000PF/1KV Disc Capacitor
PS1 1N5400 1N5400 1N5400 1N5400
+
+
PS2 Power Source 1 Power Source 2 Power Source + From Vehicle Ignition Switch- Circuit Breaker 12VDC 5Amp 24VDC 10Amp Power Source 10-40VDC On / Off Switch ( )
Annex B FirePro Material Safety Data Sheet
Annex C Maritime and Coastguard Agency Certificate of Inspection and Tests
Annex D Health and Safety Executive Incident Report Section 8 Appendix
page 33 of 41
8 APPENDIX: CHEMISTRY OF AEROSOL GENERATION
The structure of the epoxy resin used in the pyrotechnic composition is shown below. The elemental composition is dominated by the bracketed repeating unit C18H20O4.
The stoichiometric reaction of this compound with potassium nitrate to form the products of full combustion CO2, N2, K2CO3 and water can be written 84 KNO3+5 C18H20O4 2 K2CO3+48 CO2+50 H2O+42 N2 The molecular masses of the nitrate and epoxy are 101 and 300 respectively, so full balanced combustion requires 84.2% potassium nitrate (by mass) and 15.8% epoxy. The composition (percentage by mass) of the pyrotechnic used for FirePro is 77 % KNO3, 18 % epoxy, 4% K2CO3 and up to 1% magnesium. Potassium carbonate in the original mixture is simply expelled from the device without chemical reaction. The effective composition can be adjusted to eliminate this by multiplying mass fractions of the other components by a factor of 1/0.96. Magnesium is a fuel and will require input of nitrate but the KEMA results suggest levels may in fact be negligibly low. Adjusting the composition to neglect magnesium can be done by multiplying by a further factor of 1/0.99. Overall this gives an effective composition (by mass) of 81.0 % KNO3 and 19.0% epoxy. Comparing with the stoichiometry required for complete combustion shows that the composition is significantly fuel rich. The stoichiometric ratio is actual air to fuel ratio divided by that needed for full combustion. In this case the stoichiometric ratio is
Some idea of the potential impact on combustion properties can be gained from the data in Figure 2 that shows the typical variation of CO production from gas boilers as the stoichiometric ratio falls below 1 and they become under-ventilated. Any significant reduction in the stoichiometric ratio below 1 risks very rapid increase in CO production.
page 34 of 41
Figure 2: CO production from boiler combustion at stoichiometric ratios below 1.
- 1
COMBUSTION PRODUCT ESTIMATION The actual reaction of the effective composition can be written (in molar terms) as 0.9268 KNO3+0.0732 C18H20O4 0.4634 K2CO3+0.4634 N2 + a H2O + b H2 +c CO2+d CO The molar fractions of the different product fractions a, b, c and d can be determined at a given final temperature from three equations of mass conservation (for hydrogen, carbon and oxygen) and the equilibrium constant for the water gas shift reaction at that temperature. Carbon balance: 1.317 = 0.4634 + c + d Hydrogen balance: 1.464 = 2a + 2b Oxygen balance: 2.78 + 0.2928 = 1.390 + a + 2c + d Water gas shift equilibrium constant7 : 10(-2.4198+.0003855.T+2180.6/T) Figures 3 to 6 show the solutions of these equations at a range of product temperatures.
7 https://web.wpi.edu/Pubs/ETD/Available/etd-050406-023806/unrestricted/ccallaghan.pdf
page 35 of 41
Figure 3 shows the molar fractions and Figure 4 shows the mass yields of different products as a proportion of the amount of potassium nitrate in the device. Figure 5 shows the volume fraction of CO in the undiluted suppressant stream.
Figure 3: Mole fractions of products
Figure 4: Mass fractions of products 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 750 850 950 1050 1150 1250 1350 Moles per mole of KNO3 Temperature (K) Water Hydrogen CO2 CO 0 0.05 0.1 0.15 0.2 0.25 0.3 750 850 950 1050 1150 1250 1350 Mass of gas produced (kg per kg KNO3) Temperature (K) Water Hydrogen CO2 CO
page 36 of 41
Figure 5: Volume fraction of CO in the undiluted stream. Note 20% = 200,000 ppm
Figure 6: CO/CO2 molar ratio The question of what product temperature is appropriate depends on the rate of cooling, because the reaction is severely kinetically limited at low temperature. To illustrate this point, the water gas shift reaction CO + H2O -> H2 + CO2 is increasingly thermodynamically favoured at low temperatures. But when carried out industrially, the reaction temperature has to be raised to about 500-550 °C to make it progress at a reasonable rate. It is unlikely that significant CO conversion continues in the Fire Pro device after the temperature drops to 500°C (773K). In all probability CO conversion will freeze out higher temperatures. 0 5 10 15 20 25 30 35 750 850 950 1050 1150 1250 1350 Volume percentage CO (%) Temperature (K) 0 0.2 0.4 0.6 0.8 1 1.2 1.4 750 850 950 1050 1150 1250 1350 CO/CO2 ratio Temperature (K)
page 37 of 41
Overall the analysis of combustion products suggests a yield of CO of between 0.08 and 0.13 kg per kg of potassium nitrate (Figure 4) or between 0.06 and 0.1 kg per kg of pyrotechnic mix . The CO concentration in the undiluted suppressant stream close to the outlet would be 160,000 to 290,000 ppm (Figure 5). For the quoted composition (effective epoxy mole fraction 7.32%) the CO/CO2 molar (or volume) ratio would be between 0.42 and 1.15. All of these decomposition product yields are very sensitive to the composition of the pyrotechnic. For example Figure 7 illustrates how CO/CO2 ratios fall sharply as the epoxy fraction falls towards the stoichiometric ratio (4.8% Epoxy).
Figure 7: CO/CO2 ratios as a function of effective epoxy (mole) fraction. The red line shows the composition quoted in the FirePro MSDS
If strict quality control is not maintained on the pyrotechnic composition in different batches then significant variations in CO yield are to be expected.
0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2 700 800 900 1000 1100 1200 1300 CO/CO2 Ratio Temperature K 8 % Epoxy 7 % Epoxy 6 % Epoxy 7.32 % Epoxy
Annex E MAIB Safety Bulletin 1/2020
M A R I N E A C C I D E N T I N V E S T I G AT I O N B R A N C H SAFETY BULLETIN SB1/2020 MARCH 2020 Inadvertent discharge of a FirePro condensed aerosol fire extinguishing system during its installation on board the fishing vessel Resurgam (PZ 1001) on 15 November 2019 resulting in one fatality Extracts from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 Regulation 5: “The sole objective of a safety investigation into an accident under these Regulations shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of such an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” Regulation 16(1): “The Chief Inspector may at any time make recommendations as to how future accidents may be prevented.” Press Enquiries: 01932 440015 Out of hours: 020 7944 4292 Public Enquiries: 0300 330 3000 NOTE This bulletin is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2020 See http://www. nationalarchives.gov.uk/doc/ open-government-licence for details. All bulletins can be found on our website: https://www.gov.uk/maib For all enquiries: Email: maib@dft.gov.uk Tel: 023 8039 5500 Fax: 023 8023 2459 SAFETY BULLETIN Image courtesy of www.marinetraffic.com Resurgam
MAIB SAFETY BULLETIN 1/2020 This document, containing safety lessons, has been produced for marine safety purposes only, on the basis of information available to date. The Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 provides for the Chief Inspector of Marine Accidents to make recommendations or to issue safety lessons at any time during the course of an investigation if, in his opinion, it is necessary or desirable to do so. The Marine Accident Investigation Branch is carrying out an investigation into the fatality of a shore- based engineering apprentice who was working in the engine room of the fishing vessel Resurgam in Newlyn on 15 November 2019. The MAIB will publish a full report on completion of the investigation. Andrew Moll Chief Inspector of Marine Accidents NOTE This bulletin is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall not be admissible in any judicial proceedings whose purpose, or one of whose purposes, is to apportion liability or blame. This bulletin is also available on our website: www.gov.uk/maib Press Enquiries: 01932 440015 Out of hours: 020 7944 4292 Public Enquiries: 0300 330 3000
1 BACKGROUND On 15 November 2019, the UK registered fishing vessel Resurgam was in Newlyn, England undergoing maintenance. An engineer and an apprentice from the owner’s shore-based support team were working on the main engine in the engine room. Also working in the engine room were two contractors installing a new FirePro condensed aerosol fire extinguishing system. During the installation and without warning, the fire extinguishing system partially and inadvertently discharged, filling the engine room with a dense cloud of aerosol fire suppressing particles (Figure 1). Both installation contractors and the company’s engineer managed to evacuate, but the apprentice collapsed in the engine room. He was later recovered by the local fire and rescue service but was found not breathing and could not be resuscitated. Figure 1: Typical discharge of a condensed aerosol fire suppressant (not at time of accident) Aerosol generator INITIAL FINDING The exact causes and circumstances of this accident are still being investigated and the findings will be published by the MAIB in a full investigation report. However, during the inadvertent discharge, it is evident that the apprentice inhaled a high concentration of the suppressant particles and this significantly contributed to the fatality.
2 FirePro’s Installation and User Manual and its product’s material safety data sheets had recognised the inadvertent discharge of the system, particularly during installation and maintenance, as a hazard. However, the loss of life was not identified as a potential outcome; therefore, the risk associated with inhaling or ingesting a large volume of the suppressant particles was not fully appreciated or protected against. SAFETY LESSONS Vessel owners, operators and those contracted to install FirePro and other similar condensed aerosol fire extinguishing systems should be fully aware of the potential risk to life from exposure to the aerosol particles. Safety precautions should be put in place to ensure that personnel are not exposed to this hazard:
● Prior to intentional discharge of a condensed aerosol system, there should be visible and audible alarms to alert personnel. Checks should also be made to ensure the protected compartment has been evacuated before the system is activated.
● When condensed aerosol fire extinguishing systems are being installed or maintained the system should be fully isolated to guard against inadvertent activation, non-essential personnel should be clear of the area and an enclosed space rescue plan should be in place. RECOMMENDATION FirePro is recommended to: S2020/114 Issue a safety alert to the owner/operators of vessels fitted with its systems and its network of marine installation/maintenance engineers highlighting the circumstances of this accident and advising them of appropriate measures to take to reduce the risk of exposure to fire suppressant particles. Safety recommendations shall in no case create a presumption of blame or liability
Annex F MAIB safety flyer to the fishing industry
SAFETY FLYER TO THE FISHING INDUSTRY Inadvertent discharge of a condensed aerosol fire-extinguishing system on board the fishing vessel Resurgam (PZ1001) on 15 November 2019 Narrative At 1609 on 15 November 2019, an apprentice engineer died when a FirePro condensed aerosol fire-extinguishing system was inadvertently activated in the engine room of the fishing vessel Resurgam. The apprentice engineer together with a shore engineer and two installation technicians were working in the engine room when the system activated, filling the engine room with the fire- extinguishing aerosol. All four people attempted to escape the engine room’s rapidly deteriorating atmosphere by climbing up an access ladder, which was the only exit. Three people escaped to the open deck but the apprentice engineer succumbed to the effect of condensed aerosol inhalation and collapsed at the foot of the ladder. The escape route for all four people passed in close proximity to a discharging fire-extinguishing generator. The apprentice engineer was later rescued by fire and rescue service personnel wearing breathing apparatus, but he could not be resuscitated and was pronounced dead at the scene. At the time of the accident, Resurgam was undergoing a maintenance period and the skipper and crew were not on board. As the fishing vessel was non-operational and the work was being carried out by contractors, not under the control of the skipper or crew, the Health and Safety at Work etc. Act 1974 was applicable for all work activities on board. Safety lessons
- Any gaseous or particulate fire-extinguishing medium is hazardous to health when inhaled in
significant quantities. The apprentice engineer died because he inhaled a concentrated mixture of hot particles and carbon monoxide and collapsed in a reduced oxygen atmosphere. Skippers of fishing vessels are to ensure that both they and their crew are aware of the hazards of exposure to fixed firefighting system media. Resurgam Image courtesy of Richard Kiessler (MarineTraffic.com)
Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an such investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This safety flyer is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2023 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned.
- In the event that installation or maintenance of a fixed firefighting system is being undertaken,
work in the area protected by the fixed firefighting system should be restricted to the people carrying out the work.
- Fishing vessel crew do not usually consider an engine compartment an enclosed space.
However, an engine space can become an enclosed space under the new regulations on enclosed spaces, MGN 659 (M+F) Amendment 1 The Merchant Shipping and Fishing Vessels (Entry into Enclosed Spaces) Regulations 20221, which came into force in May 2022 and applied to fishing vessels from May 2023.
- The atmosphere in an engine space can rapidly change from a safe to a hazardous atmosphere
for a number of reasons, including fumes emanating from hot work being carried out, leaking fluids and smoke emissions from overheating or smouldering machinery. In this case the inadvertent activation of a fire-extinguishing system adversely affected the breathable atmosphere and was harmful to anyone working in the engine room at the time. Make sure plans and procedures are in place so crew and contractors know how to react to such a situation.
- The person in charge of the work in the engine space is responsible for ensuring that
appropriate risk mitigation measures are taken before the work starts. This includes the completion of risk assessments and a detailed plan of the work, and identification of any conflicts with other tasks. As above, personnel working in the engine space need to know how to respond in an emergency. ¹ https://www.gov.uk/government/publications/mgn-659-mf-entry-into-enclosed-spaces Email: maib@dft.gov.uk Tel: +44 (0)23 8039 5500 Published: December 2023 Attention is also drawn to the lessons published in MAIB's safety bulletin SB1/2020: https://www.gov.uk/maib-reports/safety-warning-after-inadvertent-activation-of- condensed-aerosol-fire-extinguishing-system-leads-to-a-fatality This flyer and the MAIB’s investigation report are posted on our website: www.gov.uk/maib For all enquiries: Marine Accident Investigation Branch First Floor, Spring Place 105 Commercial Road Southampton SO15 1GH
FD06075 | 2023_英国_accidental-discharge-of-condensed-aerosol-fire-extinguishing-system-on-beam-trawler-resurgam-with-loss-of-1-life__2023-9-Resurgam-Report.pdf.pdf
分类:06_境外及港澳台调查报告 | 年份:2023 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
ACCIDENT REPORT ACCIDENT REPORT Report on the investigation of the accidental discharge of a FirePro condensed aerosol fire-extinguishing system during its installation on board the fishing vessel Resurgam (PZ1001) resulting in one fatality in Newlyn Harbour, Cornwall, England on 15 November 2019 VERY SERIOUS MARINE CASUALTY REPORT NO 9/2023 DECEMBER 2023
The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of a safety investigation into an accident under these Regulations shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2023 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. All MAIB publications can be found on our website: www.gov.uk/maib For all enquiries: Marine Accident Investigation Branch First Floor, Spring Place 105 Commercial Road Southampton SO15 1GH United Kingdom Email: maib@dft.gov.uk Telephone: +44 (0)23 8039 5500 Press enquiries during office hours: +44 (0)1932 440015 Press enquiries out of hours: +44 (0)300 7777878
CONTENTS GLOSSARY OF ABBREVIATIONS AND ACRONYMS SYNOPSIS 1 SECTION 1 – FACTUAL INFORMATION 2 1.1 Particulars of Resurgam and the accident 2 1.2 Background 1 1.3 Narrative 1 1.4 The apprentice engineer 7 1.5 Cause of death 7 1.6 Resurgam 7 1.7 W. Stevenson & Sons Limited 8 1.8 Ocean Engineering (Fire) Limited 9 1.9 FirePro 9 1.10 FirePro UK Limited 10 1.11 FirePro condensed aerosol system 10 1.11.1 Overview 10 1.11.2 Condensed aerosol generators 10 1.11.3 Fire protection control panel 12 1.11.4 Pre-activation alarm 15 1.11.5 Cabling and junction box 15 1.12 FirePro installation guidance 15 1.13 Installation design calculations 17 1.14 Vessel-specific guidance manual and installation drawings 19 1.15 Installation testing and commissioning procedures 22 1.16 Training of FirePro system service and installation technicians 22 1.17 FirePro hazard identification 23 1.18 FirePro product evaluation and approvals 24 1.18.1 Overview 24 1.18.2 United States Environment Protection Agency 24 1.18.3 United States Coast Guard 25 1.18.4 The Institute of Environmental Hygiene and Toxicology 25 1.18.5 Marine type approvals 26 1.19 Approval of the FirePro system for use on board UK registered vessels 26 1.20 Post-accident inspections, laboratory tests and trials 28 1.20.1 Initial inspection after the accident 28 1.20.2 Observations on powering up the system 28 1.20.3 Laboratory tests and trials 30 1.20.4 Electrical circuit testing 30 1.20.5 Carbon monoxide production – theoretical analysis 31 1.20.6 Aerosol generator practical trials 32 1.20.7 Health and Safety Executive technical review 33 1.20.8 Post-accident trials conducted by FirePro 33 1.21 Effects of exposure to carbon monoxide gas 33 1.22 Health and safety management 35 1.22.1 Overview 35 1.22.2 W. Stevenson and Sons Limited 35 1.22.3 Ocean Engineering (Fire) Limited 35
- 23 Use of contractors and subcontractors
37 1.24 Working in confined spaces 38 1.25 Previous similar accidents 40 1.25.1 Previous inadvertent discharges of fixed fire-extinguishing systems during Ocean Engineering (Fire) Limited servicing activities 40 1.25.2 Other reported incidents of discharges of in service FirePro systems following this accident 40 SECTION 2 – ANALYSIS 41 2.1 Aim 41 2.2 Overview 41 2.3 The accidental discharge of the aerosol generators 41 2.4 Evacuation of the engine room following the accidental discharge 42 2.5 Emergency response 45 2.6 Hazard awareness 46 2.7 Installation standards 47 2.7.1 System installation 47 2.7.2 Installation and commissioning process on board Resurgam 49 2.8 Maritime and Coastguard Agency oversight 50 2.9 Installation standards 51 2.10 Working with contractors and safe systems of work 51 2.11 Normally occupied and normally unoccupied spaces 52 SECTION 3 – CONCLUSIONS 53 3.1 Safety issues directly contributing to the accident that have been addressed or resulted in recommendations 53 3.2 Other safety issues not directly contributing to the accident 54 3.3 Safety issues not directly contributing to the accident that have been addressed or resulted in recommendations 54 SECTION 4 – ACTION TAKEN 55 4.1 MAIB actions 55 4.2 Actions taken by other organisations 55 SECTION 5 – RECOMMENDATIONS 57
FIGURES Figure 1: Resurgam berthed on the North Pier, Newlyn Figure 2: Fire protection control panel mounted in the wheelhouse Figure 3: Engine room plan, showing positions of the aerosol generator units Figure 4: Positions of installation technicians and Stevenson engineers when the fourth aerosol generator was plugged in Figure 5: Cloud of aerosol particles seen coming from Resurgam’s engine room Figure 6: Schematic of engine room space, winch room and lobby area Figure 7: Fire-extinguishing action of condensed aerosol Figure 8: The component parts of a FirePro condensed aerosol generator Figure 9: View of engine room looking aft, showing position of aerosol generator unit adjacent to the access ladder Figure 10: Typical layout of condensed aerosol unit firefighting system Figure 11: Fire control panel DIP switch settings Figure 12: Condensed aerosol stream length and temperature illustration Figure 13: Spreadsheet from calculation workbook Figure 14: Ocean Engineering wiring drawing for Resurgam installation Figure 15: FirePro system wiring diagrams from Resurgam’s vessel-specific manual Figure 16: Aerosol generator firing circuit simulation lamps Figure 17: Power supply unit installed in the electrical distribution cabinet in the wheelhouse Figure 18: FPX103C control panel on board Resurgam following the accident Figure 19: Junction box in engine room lobby on board Resurgam following the accident Figure 20: Set up of HSE condensed aerosol generator test Figure 21: FirePro control panel risk assessment Figure 22: Ocean Engineering’s generic method statement for the installation of an aerosol system Figure 23: Approved Code of Practice flow chart: is the area a confined space? Figure 24: Sequence the FirePro generators were connected to the firing circuit during the installation Figure 25: Escape route through aerosol discharge streams
ANNEXES Annex A: Extract from FPX103C fire control panel user manual Annex B: FirePro Material Safety Data Sheet Annex C: Maritime and Coastguard Agency Certificate of Inspection and Tests Annex D: Health and Safety Executive Incident Report Section 8 Appendix Annex E: MAIB Safety Bulletin 1/2020 Annex F: MAIB safety flyer to the fishing industry TABLES Table 1: Effects of carbon monoxide exposure (NORSOK Standard Z-013) Table 2: Effects of carboxyhaemoglobin in blood
GLOSSARY OF ABBREVIATIONS AND ACRONYMS °C
- degrees Celsius
ABS
- American Bureau of Shipping
ACOP
- Approved Code of Practice
BAFE
- British Approvals for Fire Equipment
cm
- centimetres
CO
- carbon monoxide
CO2
- carbon dioxide
DIP switch
- dual in-line package switch
EPA
- United States Environmental Protection Agency
FirePro UK
- FirePro UK Limited
FirePro user manual - Information, Instruction & User Manual Version 6, 24-06-16 Fire Extinguishing Aerosol Systems Firewatch
- Firewatch South West Ltd
g
- gram
HSE
- Health and Safety Executive
HSW Act
- Health and Safety at Work etc. Act 1974
IMO
- International Maritime Organization
ISO
- International Organization for Standardization
KEMA
- Keuring van Elektrotechnische Materialen te Arnhem
kg
- kilogram
LED
- light-emitting diode
LPCB
- Loss Prevention Certification Board
g/m3
- gram per cubic metre
GT
- gross tonnage
m
- metre
m3
- cubic metre
MCA
- Maritime and Coastguard Agency
mg/m3
- milligrams per cubic metre
MGN
- Marine Guidance Notice
MSDS
- material safety data sheet
MSIS
- Marine Survey Instructions for the Guidance of Surveyors
MSN
- Merchant Shipping Notice
Ocean Engineering
- Ocean Engineering (Fire) Limited
ppm
- parts per million
PSU
- power supply unit
SNAP
- Significant New Alternatives Policy
SOLAS
- International Convention for the Safety of Life at Sea, 1974,
as amended STEL
- short-term exposure limit
Stevenson
- W. Stevenson & Sons Limited
The Code
- Merchant Shipping Notice 1872 Amendment 1 (F) The Code of
Safe Working Practice for the Construction and Use of Fishing Vessels of 15m Length Overall to less than 24m Registered Length. TLV
- threshold limit values
UPS
- uninterruptible power supply
USCG
- United States Coast Guard
UTC
- universal time coordinated
V
- volt
TIMES: All times referred to in this report are UTC unless otherwise stated. Resurgam (PZ1001) Image courtesy of Richard Kiessler (MarineTraffic.com)
1 SYNOPSIS On 15 November 2019, a FirePro condensed aerosol fixed fire-extinguishing system, which was undergoing installation, inadvertently activated in the engine room of the UK registered fishing vessel Resurgam, in Newlyn, Cornwall, England. Four shore workers were in the space but only three managed to escape. One of the four, an apprentice engineer, collapsed at the bottom of the engine room access ladder. He was recovered onto the open deck about 20 minutes later by the emergency services but could not be resuscitated. The postmortem report determined that he died from an inhalation injury and carbon monoxide poisoning. Although the investigation of the accident fell under the remit of the Health and Safety Executive, the MAIB also conducted an independent marine safety investigation to ensure the lessons from this accident were brought to the attention of the marine industry. Resurgam was undergoing maintenance and two Ocean Engineering (Fire) Limited technicians were on board installing the FirePro system. Also on board were a shore-based maintenance engineer and an apprentice engineer from W. Stevenson & Sons Limited, Resurgam’s owner and operator, who were repairing the main engine exhaust. In the final stages of the installation the aerosol generators were connected to a live electrical circuit, triggering the discharge process and rapidly filling the engine room with a dense cloud of fire-extinguishing aerosol particles. The apprentice engineer collapsed and died while trying to escape the space because he inhaled large quantities of hot aerosol particles and combustion gases, including high levels of carbon monoxide. The aerosol generators had been mounted close to areas that people could occupy and one was sited close to the only escape route from the engine room, contrary to the manufacturer’s guidance requirements. Post-accident testing provided evidence that, although the FirePro condensed aerosol system may be effective at fire- extinguishing, the risks associated with inhaling the aerosol particles and the carbon monoxide hazard were not appropriately featured in the manufacturer’s safety-related documentation. This investigation identified that the flag state requirement to approve the system before installation was not met. Additionally, and in contrast to land-based systems, there was no consistent and accredited training scheme for marine installers of this safety critical fire- extinguishing system. FirePro has been recommended to undertake a specific risk assessment for the installation and operation of each of its fire-extinguishing systems; and, to review its safety-related documentation and incorporate all of the system’s hazards, specifically carbon monoxide production. The Maritime and Coastguard Agency has been recommended to take steps to improve fire-extinguishing system installation standards. Resurgam’s owner has been recommended to revise its safety management system to ensure that personnel safety measures are in place.
2 SECTION 1 – FACTUAL INFORMATION 1.1 PARTICULARS OF RESURGAM AND THE ACCIDENT VESSEL PARTICULARS Vessel’s name Resurgam Flag UK Classification society Not applicable IMO number/Fishing numbers 8883551 / PZ1001 Type Beam trawler Registered owner W. Stevenson & Sons Limited Manager(s) W. Stevenson & Sons Limited Construction Steel Year of build 1969 Length overall 26.22m Registered length 23.22m Gross tonnage 134.0 Minimum safe manning Not applicable Authorised cargo Not applicable VOYAGE PARTICULARS Port of departure Newlyn Port of arrival Not applicable Type of voyage Alongside Cargo information Not applicable Manning Not applicable MARINE CASUALTY INFORMATION Date and time 15 November 2019 at 1540 Type of marine casualty or incident Very Serious Marine Casualty Location of incident Newlyn Harbour, North Pier Place on board Engine room Injuries/fatalities 1 fatality Damage/environmental impact None Ship operation Alongside, maintenance Voyage segment Alongside External/internal environment Moderate breeze and fine weather Persons on board 4
1 1.2 BACKGROUND The UK registered fishing vessel Resurgam was berthed alongside in Newlyn harbour for maintenance work at the time of the accident. The work was being carried out by shore workers and was not under the control of the fishing vessel’s skipper or its crew. The main work to be completed in the vessel’s engine room was a repair to the main engine exhaust and the installation of a FirePro condensed aerosol fixed fire-extinguishing system. Resurgam’s owners, W. Stevenson & Sons Limited (Stevenson) operated a fleet of fishing vessels and employed a team of shore-based mechanical and electrical engineers to help maintain them. The engine exhaust repair was to be carried out by shore-based Stevenson engineers, while the installation of the fixed fire- extinguishing system had been contracted to Firewatch South West Ltd (Firewatch), which then subcontracted to Ocean Engineering (Fire) Limited (Ocean Engineering). As the work on board Resurgam was being undertaken by shore workers and was not under the control of the vessel’s skipper or crew, the health and safety of those involved was subject to shoreside regulations, namely the Health and Safety at Work etc. Act 1974. In accordance with a memorandum of understanding1 and an operational working agreement2 between the Health and Safety Executive (HSE), the Maritime and Coastguard Agency (MCA) and the Marine Accident Investigation Branch (MAIB), the investigation of this accident fell under the remit of HSE. However, based on the initial findings of MAIB’s preliminary assessment of the accident, the Chief Inspector of Marine Accidents assessed that there were significant safety lessons for the maritime industry and opened an independent marine safety investigation. 1.3 NARRATIVE On the morning of 14 November 2019, Resurgam arrived in Newlyn and berthed at the fish quay to land its catch. When all the catch had been landed, Resurgam was moved from the fish quay to a maintenance berth on the harbour’s North Pier (Figure 1). Once alongside North Pier, Resurgam’s engines and generators were shut down and electrical power for lighting and other systems was supplied via a shore connection. At about 0930, two Ocean Engineering installation technicians, a lead technician and a trainee, boarded Resurgam and spoke briefly to its skipper. The lead technician then carried out an initial inspection of the wheelhouse and engine room. Following his inspection, the lead technician briefly discussed the installation process and the proposed positioning of the system’s four aerosol generators with Stevenson’s engineering project manager. Arrangements were then made for a Stevenson welder to secure the aerosol generator mounting brackets to the engine room bulkhead and deckhead structures. 1 Memorandum of Understanding between the Health and Safety Executive, The Maritime and Coastguard Agency and the Marine Accident Investigation Branch for health and safety enforcement and accident investigation at the water margin and offshore, dated May 2021. 2 Operational Working Agreement between the Health and Safety Executive, The Maritime and Coastguard Agency and the Marine Accident Investigation Branch, dated 22 September 2021.
2 Figure 1: Resurgam berthed on the North Pier, Newlyn During the afternoon, the Ocean Engineering technicians fitted the system’s fire protection control panel (Figure 2) and power supply unit (PSU) in the wheelhouse. They also ran some cables between the wheelhouse and the engine room space. The technicians did not have sufficient cabling to complete the job and left the vessel at about 1500. At about 0900 on 15 November, the Ocean Engineering technicians arrived back on site and boarded Resurgam. The lead technician entered the engine room and identified that two of the aerosol generator brackets needed to be moved and arranged for a welder to reposition them. During the morning and into the afternoon the technicians completed the electrical cabling work, fitted coupling plugs and sockets to the aerosol generators and their electrical cables, and mounted the aerosol generators in their brackets (Figure 3). The technicians did not have the test lamps and connectors to conduct a simulated operation test of the installation. During the same period, a Stevenson mechanical engineer and an apprentice engineer, Conor Moseley, were working together on the main engine exhaust system in the engine room. Once the installation had been completed, and with the aerosol generators unplugged, a Stevenson electrical engineer, at the request of Ocean Engineering’s lead technician, connected the vessel’s 24V power supply to the FirePro system’s PSU. At about 1530, the lead technician powered up the PSU and checked the control panel display. The control panel fault alarm activated. The trainee technician entered the engine room and told the Stevenson engineers that they were about to test the extinguishing system’s pre-activation alarm. The lead technician then
3 opened the control panel’s protective cover, which released a microswitch and initiated the pre-activation alarm. The trainee technician went into the engine room space and confirmed that the alarm warning beacons were flashing and sounding. The lead technician then closed the control panel cover to stop the alarm and then returned to the engine room. Figure 2: Fire protection control panel mounted in the wheelhouse
4 Figure 3: Engine room plan, showing positions of the aerosol generator units For illustrative purposes only: not to scale Ladder 1 2 4 3 Main engine Engine room walkway Aerosol generators numbered in the sequence they were wired in the firing circuit Aerosol generator unit (FP5700) Aerosol generator unit (FP2000) FP5700 aerosol generator Generator mounting bracket Generator discharge outlet Engine gearbox FORWARD At about 1535, the Ocean Engineering technicians began to plug the aerosol generators into the sockets fitted to the fire-extinguishing system’s activation or firing cables. Both Stevenson engineers were working on the port side of the main engine, fitting new exhaust bellows. While the trainee technician plugged in the aerosol generator adjacent to the access ladder (generator 13), the lead technician sequentially connected the two forward units (generators 2 and 3) and then squeezed past the Stevenson engineers to get to the last generator (generator 4). By this time, the trainee technician had connected generator 1 and was making his way back to the wheelhouse (Figure 4). At 1540, the lead technician plugged in generator 4 and almost immediately heard a loud hissing sound behind him. Realising that the system had activated, he unplugged the generator, jumped over the main engine gearbox and ran to the access ladder, shouting “Get out”. 3 The generator numbering convention is based on the order that the generators were reportedly connected in the period before the accident and has been adopted in this report for ease of reference.
5 Figure 4: Positions of installation technicians and Stevenson engineers when the fourth aerosol generator was plugged in For illustrative purposes only: not to scale Ladder 1 2 4 3 Main engine Aerosol generator unit (FP5700) Aerosol generator unit (FP2000) Engine gearbox FORWARD Stevenson engineer Stevenson apprentice Trainee technician Lead technician The lead technician climbed the ladder as the space filled up with dense white condensed aerosol and followed the trainee technician, who was already at the top of the ladder, out on to the open deck. The Stevenson engineer grabbed the apprentice and guided him towards the access ladder. When they reached the ladder visibility in the engine room was zero and both were struggling to breathe. The engineer tried to help the apprentice onto and up the ladder. Thinking that he was following the apprentice, the engineer scrambled up the ladder and out of the engine room. When he emerged from the engine room on to the open deck he was on his hands and knees, coughing and spluttering, but quickly realised that the apprentice had not escaped. Two Stevenson engineers and the engineering project manager on board a nearby vessel saw a dense cloud of aerosol particles coming from Resurgam (Figure 5). Initially thinking that a fire had broken out, they ran to the scene. When they arrived and realised what had happened, they asked the Ocean Engineering technicians if the aerosol was hazardous. The lead technician said he understood it was safe to breathe.
6 Figure 5: Cloud of aerosol particles seen coming from Resurgam’s engine room Cloud of aerosol particles One of the Stevenson engineers entered Resurgam’s engine room to search for the missing apprentice. Visibility was poor but, when the engineer reached the bottom of the engine room access ladder, he found the apprentice lying motionless on the floor plates behind it. He tried to lift the apprentice but soon began to suffer breathing difficulties and had to leave the space and return to fresh air. Once he had regained his breath, the engineer re-entered the engine room with a rope, which he placed around the apprentice’s torso, but again he was overwhelmed by the atmosphere and had to return to the open deck. Among the safety equipment carried on board Resurgam was a compressed air breathing apparatus set. This was found and an attempt was made to use it. However, the set was soon discarded on the deck as no one had any knowledge of how to operate it. At 1550, having been alerted by a phone call, Stevenson’s engineering and health and safety managers arrived on scene and told another employee, who was standing on the quayside, to dial 999 and request the help of the emergency services. The health and safety manager then boarded the vessel and attempted to enter the engine room to rescue the apprentice but, like the previous engineer, was unable to breathe properly and had to evacuate the space. At 1555, two of the Stevenson engineers disembarked Resurgam and collected an electric fan, some ventilation trunking and an air filtered welding mask from the workshop. A further attempt was made to enter the space with the welding mask on, which again had to be aborted due to breathing difficulties. At approximately 1605, the fire and rescue service and ambulance service arrived as the fan and
7 trunking were being set up and ordered everyone on board to evacuate to the quayside. Immediately afterwards, and wearing breathing apparatus, fire and rescue service officers recovered the apprentice to the open deck. The apprentice was unconscious and not breathing, and despite the attempts of ambulance paramedics he could not be resuscitated. 1.4 THE APPRENTICE ENGINEER Conor Moseley was 20 years old. He joined Stevenson as a shore-based apprentice engineer and attended the local technical college as part of his apprenticeship. 1.5 CAUSE OF DEATH The postmortem report identified that the apprentice’s lungs were: heavy with blotchy discolouration with intense congestion associated with haemorrhaging of the small air sacs within the lungs. Blood toxicology analysis established a carboxyhaemoglobin level of 31.7% consistent with exposure to high levels of carbon monoxide (CO). The pathologist’s report concluded that, although the carboxyhaemoglobin level was high, it was not at a fatal concentration for an otherwise healthy individual. A laceration and deep bruising at the back of the apprentice’s head was consistent with an injury following a fall or collapse. Further neuropathological examination revealed no evidence of significant brain injury associated with the head injury. The cause of death was recorded as: Inhalation injury and carbon monoxide poisoning sustained following discharge of an aerosol based fire extinguishing system in a confined space. [sic] The pathologist concluded that: Mr Moseley clearly died as a result of the effects of exposure to the aerosolised fire extinguisher. This was likely a combination of reduced respirable oxygen in the engine room, and inhalation of potentially hot gases and combustion products/chemicals resulting in carbon monoxide poisoning and direct injury to the respiratory tract. 1.6 RESURGAM Resurgam was a steel hulled beam trawler. It was built in 1969 in the Netherlands and purchased by Stevenson in 1987. Stevenson transferred Resurgam onto the UK fishing vessel registry; its overall and registered lengths were 26.22m and 23.22m, respectively. The vessel’s engine room was accessed only via a ladder from a lobby area at main deck level (Figure 6). The lobby area also provided access to the vessel’s winch room and could be accessed from both the main deck, via a small watertight door, and accommodation space. Due to its registered length, Resurgam was required to comply with the Maritime and Coastguard Agency’s (MCA) Merchant Shipping Notice (MSN) 1872 Amendment 1 (F) The Code of Safe Working Practice for the Construction and Use of Fishing Vessels of 15m Length Overall to less than 24m Registered Length (The
8 Code). The Code became mandatory on 31 December 2018 and required main machinery spaces to be fitted with a fixed fire-extinguishing system and have two means of escape. These requirements were first introduced in 2002. Resurgam did not have a main machinery space fixed fire-extinguishing system or two means of escape from the engine room. As Resurgam was registered as a UK fishing vessel in 1987, the MCA had granted it several regulatory exemptions4. These exemptions included approvals to operate the vessel without a main machinery space fixed fire-extinguishing system and a second means of escape from the engine room. Following a review of Resurgam’s exemptions in 2019, the MCA informed Stevenson that it could no longer support the fire-extinguishing system exemption and told the company that one had to be installed. At the end of July 2019, MCA surveyors inspected Resurgam in preparation for its 5-yearly UK fishing vessel certificate renewal. This resulted in the identification of several deficiencies, including the absence of an engine room fixed fire- extinguishing system. On 13 August 2019, the MCA issued a short-term UK fishing vessel certificate, which was valid until 1 November 2019 and only intended to allow sufficient time to rectify the deficiencies before the issue of a full UK fishing vessel certificate. This short-term certificate was later extended for a further month and was valid until 5 December 2019. Figure 6: Schematic of engine room space, winch room and lobby area For illustrative purposes only: not to scale Lobby Galley/mess Wheelhouse Ladder Winch room Engine room 1.7 W. STEVENSON & SONS LIMITED Stevenson was a family-run business based in Newlyn, Cornwall. It owned and operated a fleet of 12 beam trawlers. To maintain its fishing fleet, Stevenson operated a support workshop in Newlyn harbour that employed eight mechanical and electrical engineering staff. The support workshop was supervised by an engineering manager and an engineering project manager. 4 Often referred to as ‘grandfather rights’ because the vessel had not been built to current regulations.
9 Stevenson employed external contractors to carry out specialist or complex maintenance tasks and vessel modifications that were beyond the normal capability of its workshop team. The contract for the installation of Resurgam’s fixed fire- extinguishing system was awarded to Firewatch, which subcontracted the work to Ocean Engineering. Firewatch had arranged for Ocean Engineering to assess the fitting of a fire suppression system to Resurgam and provide an estimated cost for the job. On 1 November 2019, Ocean Engineering carried out its onboard assessment and proposed the installation of the FirePro system. On 4 November 2019, Firewatch submitted a quote based on the fitting of four aerosol generators that Stevenson accepted. Stevenson’s engineering project manager was the nominated point of contact for the Ocean Engineering installation technicians. On Saturday 9 November 2019, Stevenson sent an email to the MCA informing it of the plan to fit a FirePro condensed aerosol system and advising that the installation would be undertaken by Ocean Engineering. In response, the MCA extended the short-term fishing vessel certificate by one month to 5 December 2019, which allowed time for the fire-fighting system to be fitted. The MCA had no further involvement in the installation and Stevenson did not query this. 1.8 OCEAN ENGINEERING (FIRE) LIMITED Based in Penryn, Cornwall, Ocean Engineering was founded in 2004 and specialised in marine fire safety equipment installation and servicing. It had other branches across the south coast of England and in Scotland but most of its commercial activity focused on the south-west region of the UK. Ocean Engineering was listed on the FirePro UK Limited (FirePro UK) website as one of the latter’s authorised distributors for the installation and servicing of FirePro systems. It serviced other types of condensed or powdered aerosol systems and was approved to install Fireaway Inc.’s Stat-X system. The company had two directors, one responsible for operations and the other for commerce; each director held a 50% shareholding. The operations director’s responsibilities included training installation engineers; he also designed proposed installation solutions and prepared plans and documentation for customers. The operations director was supported by a technical support manager and the service manager. Ocean Engineering had been assessed by Det Norske Veritas and Lloyd’s Register Quality Assurance as compliant with ISO 9001:2015, which was the International Organization for Standardization (ISO) standard for quality management systems. 1.9 FIREPRO Trading under the name FirePro5, the Cyprus-based company Celanova Limited designed, manufactured and distributed condensed aerosol fire-extinguishing systems. FirePro’s marketing literature described the system as an environmentally friendly and safe alternative to halon-based systems, which were phased out due to their impact on the ozone layer. FirePro had a global network of distributors and operated in over 100 countries. 5 In Italy, Celanova Limited traded under the brand names Aerpro and FireBan.
10 1.10 FIREPRO UK LIMITED FirePro UK was the sole importer and distributer of the FirePro systems in the UK. It was based in Surrey, England and had a network of authorised distributors and installers across the UK and Ireland. It required its distributors and installers to be third party accredited fire systems specialists. The recognised accreditation standard for land-based installations was either the British Approvals for Fire Equipment (BAFE) standard, SP2303-03 – Fixed Gaseous Fire Extinguishing Systems, or the Building Research Establishment Group, Loss Prevention Certification Board (LPCB), Loss Prevention Standard LPS 1014. Both the BAFE and LPCB schemes required trainee installers to follow an accredited company training programme for fire-extinguishing system installation, including condensed aerosols. Once BAFE and LPCB accredited installers had completed the training, they were examined to assure satisfactory competence levels. Equivalent accreditation for marine fire-extinguishing systems did not exist and Ocean Engineering was not accredited to either the BAFE or LPCB standard. Ocean Engineering went into liquidation in 20226 1.11 FIREPRO CONDENSED AEROSOL SYSTEM 1.11.1 Overview In 1995, a group of Russian scientists developed a solid compound that, when ignited, produced an aerosol that was effective at extinguishing fires. In 1997, the FirePro condensed aerosol generator, which contained such a solid compound, was patented by Celanova Limited. The key components of the FirePro system installed on board Resurgam were the aerosol generators, a control panel with protective cover and pre-activation microswitch, alarm warning beacons for the protected space, a PSU, junction box and electrical distribution cables. 1.11.2 Condensed aerosol generators The solid compound within the FirePro aerosol generator consisted of potassium nitrate, potassium carbonate, magnesium, and an epoxy resin polymer. The potassium-based particulates generated when the solid compound was ignited disrupted the chemical chain reaction of combustion on contact with a flame to supress and extinguish a fire (Figure 7). The aerosol generators were fired by a pulse of electric current delivered following the activation of the fire protection control panel. The current heated a coil, which ignited the solid compound and initiated an exothermic chemical reaction that generated hot particles and gases. The particles and gases then passed over cooling material (alumina), which cooled the gases, before being expelled from the generator into the protected compartment (Figure 8). The generators’ discharge took 10 to 20 seconds. 6 As a result of the liquidation no MAIB recommendations were made
11 Figure 7: Fire-extinguishing action of condensed aerosol Image courtesy of FirePro (www.firepro.com) Figure 8: The component parts of a FirePro condensed aerosol generator Image courtesy of FirePro (www.firepro.com)
12 FirePro manufactured various models of aerosol generator units based on aerosol generating capacity. Three FP57007 units and one FP2000 unit were fitted on board Resurgam (Figure 3) and were mounted with their outlets facing down at a slight angle of approximately 15° to the horizontal. The FP5700 generator positioned next to the engine room access ladder was mounted at head height with its outlet 86cm from the closest edge of the ladder and walkway (Figure 9). The other generators were mounted in close vicinity to the engine room’s floor plate walkways, just above head height. Figure 9: View of engine room looking aft, showing position of aerosol generator unit adjacent to the access ladder Aerosol generator unit angled 15° down from the horizontal 86cm 1.11.3 Fire protection control panel Ocean Engineering fitted a marine approved FirePro FPX103C dual loop (Auto/ Manual) fire protection control panel, manufactured by Logician Ltd, on board Resurgam (Figure 2). The panel could be powered by either a 12V or 24V supply and support up to four FirePro generators (24V supply). It could be configured (Figure 10) to provide:
● dual loop fire detection (two detector circuits)
● automatic and/or manual activation
● automatic pre-activation engine, fuel and ventilation shut down
● spin-down delay to allow time for machinery to stop before activation
● fault monitoring of fire detector loops and generator firing circuits. 7 FP stands for FirePro and the number denotes the net mass of the solid compound in grams: 1g of solid compound equates to 1 litre of aerosol.
13 Figure 10: Typical layout of condensed aerosol unit firefighting system Image courtesy of FirePro (www.firepro.com) DIP switches
14 The panel had five light-emitting diode (LED) indication lights, an internal audible alarm, a manual activation push button and a combined alarm mute and system reset push button (Figure 2). The panel lights indicated: ● Green protection panel on LED: constantly illuminated – power on; double flashing when spin-down started; single flashing when system activated. ● Red fire suppression activation LED: normally off; flashing when spin-down started; constantly illuminated when system activated. ● Amber fire suppression fault LED: normally off; constantly illuminated if fault in firing circuit. ● Red/amber detector loops fault LED: normally off; flashing when detector loop fault. ● Red/amber detector loops fire alarm LED: normally off; flashing when detector alarm activated. The red and yellow manual activation button had to be pressed and held in for 1 second to activate the system. To help prevent accidental activation, an anti-tamper tag, which needed be pulled off before the button was pressed, usually covered the manual activation button. The mute/reset button silenced the panel alarms when pressed. To reset the system, the mute/reset button had to be pressed and held in for 5 seconds. A four-switch dual in-line package switch (DIP switch)8 was attached to the printed circuit board within the control panel. DIP switches one to three were used to set the automatic activation spin-down times9 or disable the automatic activation mode. DIP switch four was used to select single or dual loop fire detection alarm activation. Resurgam’s system was designed for manual operation only. The vessel had a separate fire detection system and therefore no detectors were connected to the FPX103C panel; instead, 10k ohm10 resistors were connected across the printed circuit board’s dual loop connections. The DIP switches were set to an automatic mode with a 5-second spin-down delay and dual loop activation (Figure 11). 8 DIP switches are designed to be mounted on printed circuit boards to provide a range of electrical inputs to an electronic device based on the position of the individual switches. 9 Spin-down times could be set between 0 to 30 seconds in 5-second increments. 10 An ohm is a unit of electrical resistance across a conductor. A 10k resistor is equivalent to 10,000 ohms. Figure 11: Fire control panel DIP switch settings Red markers indicate switch positions ON OFF
15 1.11.4 Pre-activation alarm A lockable hinged Perspex protective cover was fitted on the front of the FPX103C control panel (Figure 2). The protective cover had to be unlocked and lifted to access the panel’s push buttons. Lifting the cover released the microswitch that operated the pre-activation alarm warning beacons located in the protected space. The wiring circuit for the alarm warning beacons was separate to the system’s control panel. Two pre-activation alarm warning beacons were installed on board Resurgam; one in the main engine room space and one in the lobby area. The two audible and visual alarm warning beacons were intended to allow time for anyone in the protected spaces to evacuate before the aerosol was released. 1.11.5 Cabling and junction box A four-core non-shielded electrical cable11 from the control panel and pre-activation microswitch were run from the wheelhouse to a junction box mounted in the engine room lobby. A combination of three and two core non-shielded electrical cables were run from the junction box to the aerosol generators and the alarm warning beacons. Only two core cables were required to connect to the aerosol generators. In each case, the third core cable was not connected to anything and left loose in the junction box. The four aerosol generators were wired in series and a bidirectional diode was connected in parallel with each generator. The diodes allowed current to flow in either direction when the potential difference across them exceeded 15V. This allowed the generators to be fired even when one or more were open circuit. 1.12 FIREPRO INSTALLATION GUIDANCE FirePro’s Information, Instruction & User Manual Version 6, 24-06-16 Fire Extinguishing Aerosol Systems (FirePro user manual) provided guidance to help calculate the number and sizes of aerosol generators needed to deliver optimum aerosol density for given classes of fire. The FirePro user manual was applicable to European inland waterway vessels as well as the UK and included regulation applicable to Europe. To aid installation planning, FirePro also supplied its distributors with a design calculation spreadsheet, comprised of a series of pages in which to input the size, shape and type of space to be protected. Once the measurements and requirements were entered, the spreadsheet recommended suitable aerosol generator models. It also indicated the models not to use. The importance of choosing the correct generators and locating them at safe distances from structural components, combustible materials and people was explained in the manual and figures illustrating the length of the discharge streams and temperatures (Figure 12) were used to assist the process. The figures illustrated the total discharge stream lengths and three temperature-related discharge stream lengths for each generator model. 11 A shielded cable or screened cable is an electrical cable that has a common conductive layer around its conductors for electromagnetic shielding. The shield acts as a Faraday cage – a surface that reflects electromagnetic radiation. This reduces both the interference from outside noise onto the signals and the signals from radiating out and potentially disturbing other devices.
16 Figure 12: Condensed aerosol stream length and temperature illustration For illustrative purposes only: not to scale 0 500 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 1000 0 500 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 1000 FP-5700 Distance from generator outlet (mm) Distance from generator outlet (mm) FP-4200T FP-3000 FP-2000 FP-1200 Maximum height of installation Minimum clearance from persons Minimum clearance from combustible material Minimum clearance from construction structure* => Discharge length => >75 => >200 => >400 Three temperature zones Temperature (°C) L1 L2 L3 *L1 does not appear on the above diagram, red shading indicates aerosol generator model only.
17 The three lengths were:
● L1 = distance in metres away from the aerosol generator outlet where the discharge temperature did not exceed 400°C (minimum distance from construction structure);
● L2 = distance in metres away from the aerosol generator outlet where the discharge temperature did not exceed 200°C (minimum distance from combustible material);
● L3 = distance in metres away from the aerosol generator outlet where the discharge temperature did not exceed 75°C (minimum distance from persons). FirePro’s temperature/distance values were based on Paragraph 23 of the International Maritime Organization (IMO) Maritime Safety Committee Circular, MSC.1/Circ.1270: Revised Guidelines for The Approval of Fixed Aerosol Fire- Extinguishing Systems Equivalent to Fixed Gas Fire-Extinguishing Systems, as Referred to in SOLAS 74, for Machinery Spaces. The Circular stated that aerosol generators should be separated from escape routes and areas where people may be present by at least the minimum safe distance for exposure to temperatures of 75°C. The L3 values for the FP5700 and FP2000 aerosol generators were 2m and 1.5m, respectively (Figure 12)12. FirePro’s user manual was supplemented by a marine annex13 that contained specific guidance for marine applications. The first page of the marine annex reiterated the need for minimum safe distances between generators, escape routes and persons. 1.13 INSTALLATION DESIGN CALCULATIONS Ocean Engineering’s service manager and the trainee installation technician had measured the main machinery space (protected space) dimensions two weeks before the accident, during a visit to the Stevenson offices and Resurgam in Newlyn. The measured dimensions included the volume of the engine room, lobby area and winch room, which could not be isolated from one another and were linked by the engine room access ladder opening (Figure 6). The height of the engine room was 2.3m. The gross volume of the protected space was calculated to be 153m3. The net volume was calculated to be 138m3, taking into account the volume of impermeable items such as machinery and tanks, of which 90m3 (65% of net volume) was the engine room space alone. Ocean Engineering’s operations director used FirePro’s design calculation spreadsheet to assess the number and models of aerosol generators required for the protected space. Page 1 of the spreadsheet listed the installation company’s details. Pages 2 and 3 contained the design calculation and generator selection sheets. The design calculation sheet (Figure 13) could be used to determine the volume of the protected space and the total mass of aerosol generating compound required to extinguish a fire. The operations director had already calculated the net volume of the space and entered it directly into the spreadsheet. He also entered 0.6m to 2.5m as the required discharge stream length. The actual lengths, widths and heights 12 L1 is not indicated on Figure 12, as the temperature of the stream was reported as being less than 400°C in the FirePro user manual. 13 FirePro Annex 2 Marine Manual Version 1, 07-05-14 for Small Vessel Codes.
18 Figure 13: Image courtesy of FirePro (www.firepro.com) Spreadsheet from calculation workbook SELECT UNITS Meters VOLUME 138 (if not to be calculated) ROOM NAME & No. SPACE TYPE ROOM SHAPE Length Width Height SECTION DIMENSION m x m x
m
VOLUME
- 000
m3 0.00 CLASS OF FIRE STREAM REQUIRED (m) m SAFETY FACTOR (sf)** **FOR ADDITIONAL SAFETY REPLACE CURRENT SAFETY FACTOR AS APPLICABLE TOTAL VOLUME THIS ROOM IN CUBIC METERS (m3) 138.00 m3 V (m3) Total Volume EAD
SF
- 00
m3 x 100 g/m3 x
1.3
- 00
g RECOMMENDED GENERATOR MODEL(S) SELECTION Recommended Models by Stream Lenth: Recommended Models by Volume: CONFIRM STREAM LENGTH CORRECTNESS OF RECOMMENDED GENERATOR-ROOM HEIGHT Vs STREAM REQUIRED CONFIRM SIZE CORRECTNESS OF GENERATOR RECOMMENDED - ROOM VOLUME Vs GENERATOR COVERAGE IMPORTANT REMARKS:
- THIS SOFTWARE IS ONLY A GUIDING TOOL - SELECTION OF GENERATORS IS THE USER's RESPONSIBILITY.
- FOR PROTECTED VOLUMES EXCEEDING 4M HEIGHT GENERATORS SHOULD BE INSTALLED IN STAGGERED
ARRANGEMENT TO ENABLE PROPER TOTAL FLOODING - PLEASE CONSULT MANUFACTURER.
- ALWAYS CHECK CALCULATIONS FOR CORRECTNESS
TOTAL VOLUME THIS SECTION 138.00 m3 TOTAL FirePro® MASS REQUIRED FOR VOLUME 1 17940.00 g D (g/m3) Rectangular
- ABOVE SELECTION IS JUST A RECOMMENDATION. ENGINEERING JUDGMENT SHOULD BE APPLIED FOR PROPER
SELECTION OF GENERATORS TAKING INTO CONSIDERATION ROOM HEIGHT(STREAM LENGTH), GENERATOR ORIENTATION IN RELATION TO THE VOLUME ARRANGEMENT, OPENINGS etc. FirePro Systems Ltd all rights reserved Unable to Recommed Models - Pls Select Stream Length Required FP-500S, FP-1200, FP-2000, FP-3000 M (g) Mass of FirePro® Aerosol Extinguishing Application Density (g) Installer company Other Large Size Enclosure Height 1.3 OCEAN ENGINEERING (FIRE) LTD D e s i g n C a l c u l a t i o n S h e e t 0.6 Class B - Combustible Liquids Engine room VOLUME 1 (MCA Classification Society )
19 of the protected space were not entered. The spreadsheet calculated that, with a stipulated14 safety factor of 1.3, Resurgam’s engine room required 17940.00g of solid aerosol forming compound. The generator selection sheet contained a generator model selection table and listed the recommended models based on the volume of the protected space and the selected discharge stream length. Based on the volume of the protected space, the generator selection sheet recommended the use of models FP500S, FP1200, FP2000 and/or FP3000. The recommended generator models selected by stream length could not be displayed because the height of the protected space had not been entered on the design calculation sheet. Based on the mass of compound required, the operations director selected three FP5700 and one FP2000 generator. This equated to 19100.00g of solid compound, which was 6% higher than the required mass but within the 10% tolerance set by FirePro. A note on the generator selection sheet’s FP5700 cell stated: select this model only if the room height exceeds 4m. The bottom of the page carried the following warning, which was not included in the print area of the spreadsheet: DO NOT USE FP5700 – HEIGHT IS TOO SMALL The spreadsheet also contained advice about the installation and design, particularly the selected generator’s size and its associated discharge stream lengths and positioning. This section of the spreadsheet explained that the FP5700 generator unit was designed for use in very large volumetric enclosures, typically exceeding 500m3 and heights over 4m. The operations director did not produce a job specific method statement or installation guidance for the installation on board Resurgam. Ocean Engineering did not confirm with either Stevenson or Firewatch that the proposed installation had not been approved by the MCA for fitting on board Resurgam. Ocean Engineering made no further pre-installation visits to Resurgam and the operations director did not verify the position of the aerosol generator units in the engine room with the installation engineers. FirePro and FirePro UK had no procedures in place to scrutinise and approve its authorised installers’ design calculations and installation plans. 1.14 VESSEL-SPECIFIC GUIDANCE MANUAL AND INSTALLATION DRAWINGS Ocean Engineering had produced an information and guidance document titled Manual and Specification for the Installation of a FirePro Aerosol Extinguishing System Onboard MFV Resurgam and a simplified wiring diagram (Figure 14) for the Resurgam installation. The vessel-specific manual contained operating and maintenance instructions as well as various extracts from FirePro’s instruction manuals, including a generic FirePro system wiring diagram (Figure 15). The operating instructions explained that although the FirePro aerosol was not hazardous to health in exposures of 5 minutes or less, it should be treated like other extinguishing systems and personnel should be evacuated from the space before operating. It specifically warned of the risk of disorientation due to loss of visibility and noise following sudden discharges. 14 MSC.1/Circ.1270 - Design application density (g/m³) is the mass of an aerosol forming composition per m³ of the enclosure volume required to extinguish a specific type of fire, including a safety factor of 1.3 times the test density.
20 The vessel-specific manual also included extracts from the design calculation spreadsheet, showing the mass of aerosol compound needed to protect the space and the generator models selected to deliver the requirement. It omitted the spreadsheet’s warning not to use the FP5700 aerosol generator. One section of the vessel-specific manual described the FPX103C control panel; this was extracted from the manufacturer’s guide but with errors, including a statement that the control panel supported up to six generators when the maximum was four. The aerosol generators in Resurgam’s installation were connected to the system’s wiring using inline plugs and sockets. This was contrary to the wiring diagrams and system illustrations within the FirePro user manual, its marine annex, the user manual for the FPX103C control panel or Resurgam’s documentation prepared by Ocean Engineering. All of these diagrams showed the firing cables connected directly to the generators and detailed guidance was provided in the FirePro user manual on how these connections should be made. The vessel-specific manual also contained copies of the FirePro product material safety data sheet (MSDS) (see section 1.17 below), the MCA’s product Certificate of Inspection and Tests, and some marine type approvals. Stevenson was not given a copy of the manual or wiring diagram before the installation started and the installers did not have copies of them when they arrived on board. Figure 14: Ocean Engineering wiring drawing for Resurgam installation Image courtesy of Ocean Engineering (www.oceanengineering.co.uk)
21 Figure 15: FirePro system wiring diagrams from Resurgam’s vessel-specific manual
22 1.15 INSTALLATION TESTING AND COMMISSIONING PROCEDURES FirePro’s FPX103C fire control panel user manual (Annex A) included installation and operational guidance intended for both land and marine applications. The manual included commissioning procedures to follow once the system’s installation was completed. Part of the commissioning requirement was to test if the panel correctly identified faults in the extinguishing circuit and to simulate the activation of the installation. For both tasks, the manual stated that the aerosol generators had to be disconnected and replaced by simulation lamps (Figure 16). Before doing this, the power to the whole system had to be isolated. The commissioning instructions also detailed how to return the panel to its normal operating condition after the tests and simulation were complete. To do this, the panel had to be reset to normal operating conditions and the power isolated completely before removing the simulation lamps and reconnecting the generators. Section 16 of the FPX103C manual referred to regulatory information relating to MCA approvals. The section included a copy of the MCA’s Certificate of Inspection and Tests and excerpts from its Marine Survey Instructions for the Guidance of Surveyors Fire Protection Arrangements (MSIS 12). Figure 16: Aerosol generator firing circuit simulation lamps 1.16 TRAINING OF FIREPRO SYSTEM SERVICE AND INSTALLATION TECHNICIANS The FirePro user manual described the project phases for a typical FirePro installation from system design to delivery. The manual stated that the installation phase should be carried out by Certified Authorized Technical Technician Aerosol Systems (CATTAS) trained personnel on the basis of installation drawing, manual and standards. This only applied to shore-based installations in Europe.
23 Ocean Engineering’s installation technicians undertook a training programme that included health and safety and specialised installation and fire equipment servicing. Approved training providers were used if specific equipment manufacturer requirements existed. For FirePro installations, Ocean Engineering did not have a formalised training programme to follow or written standards to achieve; instead, trainees were required to accompany more experienced installation technicians. When the trainee was judged to be proficient, the operations director conducted a verbal assessment to check they had sufficient knowledge to undertake unsupervised installation and maintenance. The lead technician on board Resurgam had worked for Ocean Engineering for 4 years and held a City and Guilds Electrical Installation in Buildings Certificate. The operations director had deemed him competent to install and service FirePro systems. There was no formal reassessment to ensure standards were maintained. 1.17 FIREPRO HAZARD IDENTIFICATION The IMO’s MSC.1/Circ.1270 stated that: Condensed aerosol systems for spaces that are normally occupied should be permitted in concentrations where the aerosol particulate density does not exceed the adverse effect level as determined by a scientifically accepted technique and any combustion products and trace gases produced by the aerosol generating reaction do not exceed the appropriate excursion limit for the critical toxic effect as determined in acute inhalation toxicity tests15. FirePro’s marketing literature stated that the aerosol was: Non Toxic (at design concentration), Non Conductive, Non Oxygen Depleting and Non Corrosive. One of the listed main advantages of the system was that FirePro does not produce harmful toxic compounds or acidic fumes. FirePro also described the transformation of the solid compound to a gaseous aerosol as non-pyrotechnic. The MSDS (Annex B) in FirePro’s user manual stated that the solid aerosol forming compound presented no hazard to humans. It also stated that hazards for humans related to the aerosol released during discharge had not been established because threshold limit values (TLV) were not applicable. The MSDS recognised that accidental release of the aerosol was a foreseeable event but assessed that inhalation was an unlikely route of exposure and that respiratory protection was not needed. In circumstances when this might occur the recommended first aid measure was to remove the affected person(s) from the exposure area to fresh air. The MSDS did not identify the composition of gases or particles generated during the condensed aerosol phase and stated that: The TLV’s (Threshold Limit Values) of the chemicals released in the aerosol phase are applicable only in case of long, as long as a complete professional life, exposure. This is not the case of a real life situation. [sic] 15 MSC.1/Circ.1270 made reference to the United States’ EPAs Regional Deposited Dose Ratio Program ‘Methods of Derivation of Inhalation Reference Concentrations and Application of Inhalation Dosimetry’. EPA/600/8-90/066F October 1994.
24 FirePro UK’s guidance leaflets stated that: The FirePro agent is released as an aerosol made up of minute particles suspended in a blend of carrier gases. The agent is opaque in nature so visibility may be compromised. Although the area should have been vacated prior to discharge of the FirePro agent, extensive testing by independent accredited research facilities have shown that FirePro is safe to breath for an acute exposure, and does not reduce the oxygen content within the protected space. When discharged, residual and non-harmful amounts of CO [carbon monoxide], NO2 [nitrogen dioxide], NH3 [ammonia] and HCN [hydrogen cyanide] may be detected. These levels are very small and have been certified independently as not being life threatening for an acute exposure. Proper measures should be taken to minimise the exposure time. [sic] 1.18 FIREPRO PRODUCT EVALUATION AND APPROVALS 1.18.1 Overview To underpin sales and marketing, and to achieve global accreditation with flag states and classification societies, FirePro actively engaged with a range of laboratories to scientifically determine the environmental impact and hazards associated with its product. In 2002, FirePro commissioned the Dutch environmental consultancy company Keuring van Elektrotechnische Materialen te Arnhem (KEMA) to undertake an evaluation of the aerosol generator’s solid compound and the particulates released when it combusted. KEMA’s analysis concluded that, in the open air, water vapour and carbon dioxide (CO2) would be the only combustion by-products. 1.18.2 United States Environment Protection Agency The Montreal Protocol on Substances that Deplete the Ozone Layer, which came into force in 1989, required some chemicals widely used to extinguish fires, such as halon, to be phased out. To help facilitate this, the United States Environmental Protection Agency (EPA) set up its Significant New Alternatives Policy (SNAP) programme. In 2006, following FirePro submissions, the EPA concluded that the FirePro product did not pose a greater overall risk to human health or the environment when compared to similar acceptable products. The EPA accepted the FirePro condensed aerosol, subject to use conditions, as a halon 1301 substitute for total flooding agent uses. The EPA listed the FirePro agent, along with two other FirePro trade named brands, FireBan and FirePro Extinguish, as Powdered Aerosol E. As requested by FirePro, the use of its condensed aerosol system was limited to normally unoccupied spaces. Because of the risk of accidental release of the aerosol generators, the EPA recommended that personnel wear goggles, gloves, and particulate removing respirators while performing installations and/or maintenance activities. The EPA also approved the Stat-X product, which was listed as Powdered Aerosol D and was also approved for use in normally unoccupied spaces. The Stat-X product was subject to worker safety recommendations similar to those of FirePro.
25 A legal definition of a normally unoccupied space, relating to the use of halon gases, can be found in European Union Regulation (EC) No 1005/2009 of the European Parliament and of the Council of 16 September 2009 on substances that deplete the ozone layer (recast), as amended by Commission Regulation (EU) No. 744/2010 of 18 August 2010: A protected space that is occupied for limited periods only, in particular for undertaking maintenance, and where the continual presence of persons is not necessary for the effective functioning of the equipment or facility. It defined a normally occupied space as: A protected space in which it is necessary for persons to be present most or all of the time in order for the equipment or facility to function effectively. 1.18.3 United States Coast Guard In 2006, the United States Coast Guard (USCG) Research and Development Center evaluated three condensed aerosol extinguishing systems for marine machinery space applications16. A FirePro system containing 1.1kg of solid compound was one of those selected for evaluation. Part of the USCG’s evaluation process was to identify and monitor the gases produced during combustion. It determined that the aerosol comprised potassium-based particulates and a combination of gases consisting of CO, CO2, water vapour and nitrogen. The CO production was assessed as 0.8%, equal to 8000 parts per million (ppm) and it was noted that the compartment’s oxygen fell to 19.1%. 1.18.4 The Institute of Environmental Hygiene and Toxicology In 2016, FirePro commissioned the Institute of Environmental Hygiene and Toxicology in Gelsenkirchen, Germany, to assess the condensed aerosol system. A 200g disc of solid compound was ignited in a 2.43m³ enclosure. The solid compound was not in an aerosol generator casing and the enclosure’s atmosphere was monitored for temperature, oxygen, CO2 and CO. The results indicated that, post combustion, the oxygen levels fell to 19.3% and CO2 was present at 1.2% by volume of the compartment. CO was recorded at less than 0.1% by volume (1000ppm). The enclosure’s temperature rose by approximately 4.5°C. It was reported that the estimated visibility in the chamber was between 20cm and 30cm. In October 2018, based on the institute’s assessment results, the EPA revised its 2006 SNAP assessment and accepted the FirePro systems for use in normally occupied spaces. The EPA also removed its specific recommendation that goggles, gloves and particulate removing respirators be worn during installation and maintenance activities; instead, it referred users to the OSHA17 technical manual for personal protective clothing. The Stat-X system had been approved for use in normally occupied spaces in 2014. 16 An Evaluation of Aerosol Extinguishing Systems for Machinery Space Applications Final Report, February 2006, Report No. CG-D-03-06. 17 Occupational Safety and Health Administration – a regulatory agency of the United States Department of Labor.
26 1.18.5 Marine type approvals The FirePro fire-extinguishing system had been type approved and certified for use on board ships by a number of bodies, including the MCA and four members of the International Association of Classification Societies: American Bureau of Shipping (ABS); Bureau Veritas; Registro Italiano Navale; and Croatia Register of Shipping. ABS had approved the FirePro system for use in normally occupied machinery spaces up to a maximum volume of 500m3. The conditions placed on the system included:
● maximum height of protected space 5m
● minimum design density of the aerosol 120g/m3
● minimum clearance from persons and escape routes 1.8m
● provision of a means providing an automatic pre-activation audible and visible alarm in the protected space that will allow sufficient time to evacuate the space before the aerosol is released. This time should not be less than 20 seconds. ABS also stated that automatic release of the system was not allowed on board SOLAS ships or vessels above 500GT. The other classification society type approvals had similar conditions. 1.19 APPROVAL OF THE FIREPRO SYSTEM FOR USE ON BOARD UK REGISTERED VESSELS The MCA was the approving authority for the installation, operation and maintenance of fixed fire-extinguishing systems on board UK registered vessels. In July 2016, it approved the FirePro system for use on board UK vessels of under 24m in length. The MCA also approved the use of two other condensed aerosol systems, Stat-X and Pyrogen. The MCA’s Certificate of Inspection and Tests (Annex C) approved the use of the FirePro system in normally unoccupied spaces, where the space to be protected did not exceed a deck height of 4m or an area of 64m2. It also included the conditions to be met for the planning, installation and operation of the system. The certificate also listed two control panels manufactured by Logician Ltd, the FPX103C and FPX104C, which were suitable for systems with up to four aerosol generators. The MCA described the FPX103C as a basic panel used for automatic and manual activation. It described the FPX104C as a control panel used for manual activation. The Certificate of Inspection and Tests defined a normally unoccupied space as: …an area that is not occupied by humans under normal circumstances but may be entered occasionally for brief periods. Whenever the space is entered then the isolation method is to be used to de-activate the generators within the protected enclosure. [sic] It also stated that: In some cases, it will be a requirement for the discharge of a FirePro aerosol generator to be prevented by means of an isolation switch, or other means, that shall be manually operated when personnel are present within the protected engine enclosure, or adjacent areas, which could be rendered hazardous by the discharge of the system.
27 Before the MCA approved the FirePro system, various scenarios were trialled to test how effective the system was in combatting fires. The MCA’s certificate described FirePro as: …a fire extinguishing aerosol system consisting of a non-pyrotechnicaerosol forming solid compound together with the non-pyrotechnic natural mineral coolant and egress chambers which are contained within a non-pressurised canister with one or two discharge outlets. [sic] It also explained that: The FirePro non-pyrotechnicaerosol forming solid compand is made up mainly of potassium nitrate 77%, potassium carbonate 4%, magnesium 1% and an epoxy resin polymer 18%. Once activated the SBK solid compound is turned into a rapidly expanding aerosol gas comprising of nitrogen(N2), Carbon dioxide (CO2) water vapour (H2O) and solid particles of potassium salts (K2C03). [sic] The MCA required plans to be submitted before installation and the installation to be completed to the satisfaction of one of its surveyors. The MCA also required the system’s installation, maintenance, testing and operation instructions to be provided on board. Section 7.7 of MSIS 12 provided instructions and guidance for MCA surveyors on both condensed and dispersed aerosol systems. It advised its surveyors that condensed aerosols were created in pyrotechnical generators18 and were typically non-corrosive, non-toxic and non-conductive. Despite this, the guidance warned that:
● The minimum quantity should not be greatly exceeded as powdered aerosols are typically composed of multiple soluble and insoluble compounds. Acute inhalation exposure to very high concentrations of these compounds can induce a variety of adverse effects in humans, such as eye irritation and inhalation toxicity. Unnecessary exposure to aerosol media, even at concentrations below an adverse effect level, should be avoided.
● Aerosol particles cause obscuration and possible hazards resulting from being unable to see while evacuating the space.
● Accidental exposure to the aerosol should be limited to 5 minutes as high levels of carbon monoxide may be generated. For these reasons aerosols may have approval for ‘normally unoccupied spaces’ only. These warnings were omitted from the MSIS 12 excerpts quoted in the FPX103C fire control panel manual. Of note, FirePro’s FPX104C fire control panel manual included an instruction to ensure that all power was off and that all persons were removed from the protected space before connecting aerosol generators to the firing circuit. MSIS 12 contained some contradictory guidance regarding normally occupied spaces but explained that automatic activation was only acceptable for spaces of 170m3 or less. Where automatic operation was used for spaces large enough to enter, an isolation switch had to be fitted close to the entry point. 18 The MCA explained that dispersed aerosols were non-pyrotechnically generated, but stored in containers with carrier agents (inert gases or halocarbon agents).
28 1.20 POST-ACCIDENT INSPECTIONS, LABORATORY TESTS AND TRIALS 1.20.1 Initial inspection after the accident Examination of the FirePro condensed aerosol system installation on board Resurgam after the accident found the following:
● The doors to the electrical distribution cabinet in the wheelhouse that contained the PSU were open (Figure 17). A length of cable had loosely been led from a miniature circuit breaker on the mounting rail and connected to the PSU. The circuit breaker was in the off position and the system was depowered.
● The FirePro FPX103C control panel’s (Figure 18) protective Perspex cover was closed and locked; its key was inserted in the lock. The anti-tamper tag had not been attached and was lying at the bottom of the protective cover. The pre-activation alarm microswitch was detached from the protective cover wall. None of the panel’s indicator lamps were illuminated and no audible alarms were sounding.
● The cover for the junction box (Figure 19) in the engine room lobby was off. The generators were wired in series in the order 4, 3, 1, 2.
● The FP5700 generator 1 (Figure 3), mounted adjacent to the engine room access ladder, had discharged. Its firing cable plug/socket coupling was connected.
● The FP5700 generator 2 (Figure 3), mounted near the forward end of the main engine, had not discharged. Its firing cable plug/socket coupling was disconnected.
● The FP5700 generator 3 (Figure 3), mounted near the port forward corner of the engine room, had discharged. Its firing cable plug/socket coupling was connected.
● The FP2000 generator 4 (Figure 3), mounted in the port aft corner of the engine room, had discharged. Its firing cable plug/socket coupling was disconnected.
● The two pre-activation alarm warning beacons were inactive. It is unknown when or how the pre-activation alarm microswitch became detached from the wall of the control panel’s protective cover. 1.20.2 Observations on powering up the system On 21 November 2019, the FirePro system was powered up on board Resurgam in the presence of an HSE Her Majesty’s Specialist Inspector (Electrical Engineering). All of the condensed aerosol generators were unplugged before the 24V power supply was switched on. When power was applied, the green protection panel on LED illuminated. The control panel’s amber fire suppression fault LED also illuminated and its audible alarm sounded. The pre-activation alarm warning beacon audible alarms sounded in the engine room and their warning lights flashed. The pre-activation alarms had activated because the microswitch had detached from the control panel cover and was in its open position. The alarms stopped when the microswitch was closed. The fire suppression system voltage in the lobby junction box was measured at 22.4V.
29 Figure 17: Power supply unit installed in the electrical distribution cabinet in the wheelhouse Power supply unit Cable from circuit breaker Circuit breaker Figure 18: FPX103C control panel on board Resurgam following the accident Hinge Anti-tamper cover Locked positions Microswitch open Double-sided sticking tape
30 Figure 19: Junction box in engine room lobby on board Resurgam following the accident Diodes From FPX-103C panel (four-core cable) To aerosol generator 1 (three-core cable) To aerosol generator 2 (three-core cable) To aerosol generator 3 (three-core cable) To aerosol generator 4 (two-core cable) To alarm beacons 1.20.3 Laboratory tests and trials Following the accident, Resurgam’s FirePro system was dismantled and transported for forensic examination to the HSE Science and Research Centre in Buxton, Derbyshire. The HSE commissioned it to examine and test Resurgam’s FirePro system and conduct aerosol generator discharge trials. The aim of the system examination and tests was to determine the causes of the accidental discharge. The aim of the generator discharge trial was to identify and measure the combustion gases created during the ignition of the solid compound and to measure the stream length temperatures. MAIB inspectors witnessed the system tests and discharge trials. 1.20.4 Electrical circuit testing Resurgam’s FirePro system electrical components and cabling were examined and tested by the HSE Science and Research Centre, and no faults were found. The components were then reconnected under laboratory bench test conditions as they were found on board Resurgam, but with simulation lamps connected to the firing circuit instead of the aerosol generators. A manually operated switch was connected in series with each test lamp to simulate fault conditions and the connection and disconnection of the aerosol generators.
31 When a 24V power supply was connected to the FPX103C control panel with the firing circuit switches closed (generator connected condition), the green protection panel power on LED illuminated and lamps simulating the aerosol generators remained unlit. Opening any or all the switches caused the amber fire suppression fault LED to illuminate and the panel audible alarm to sound. When the manual activation button was pressed and held for 1 second, with the four simulation lamp switches open (generator disconnected condition), the panel’s audible alarm beeped and the red fire suppression activation lamp flashed for 5 seconds (spin-down period). After the 5-second spin-down time elapsed the panel’s audible alarm sounded and the red activation LED illuminated constantly; the green power on LED light began to flash. The panel remained in this state until the detector loop mute/reset button was pressed and held in for 5 seconds. The test was then repeated without resetting the panel. With the control panel in its activated state the simulation lamp switches were closed one at a time in the order the generators were connected on board Resurgam. During the test, no current flowed until the final switch was closed. The current caused all four test lamps to illuminate. The sequence was repeated in the next test, but the switch for the lamp simulating the generator that did not discharge (generator 2) was left open. Again, current only flowed when the final switch was closed; the current caused the three connected test lamps to illuminate. Two key findings stated in the HSE’s electrical testing report19 were:
● With the FirePro protection panel20 in the activated state connecting aerosol generators No.1, No.2 and No.3 had no effect, however subsequently connecting No.4 discharged all four aerosol generators.
● The roller-actuated microswitch connected to the audible-alarm located in the engine room was completely separate from, and had no effect on, the FirePro FPX103C protection panel and its associated aerosol generators. [sic] 1.20.5 Carbon monoxide production – theoretical analysis CO gas had been identified as a significant contributory factor in the fatality and the HSE carried out analysis to determine its source. The first step was to theoretically analyse CO production, which found that converting solid potassium nitrate into potassium carbonate in an aerosol form was a pyrotechnical reaction21. It was then possible to calculate the potential amount of CO produced when the reaction occurred. The theoretical calculations were based on the stoichiometric22 reaction of potassium nitrate with epoxy resin and assumed a hot stream at the generator’s outlet. The calculations showed that, when enclosed in an FP5700 generator canister, the composition of potassium nitrate and epoxy resin would burn fuel-rich, leading to incomplete combustion and producing CO (Annex D). It was possible 19 HSE Report EM/20/15, 22 April 2020. 20 Referred to in this report as the control panel. 21 A pyrotechnical substance, as defined by UN Model Regulations Volume 1 Annex Part 2 Classification, is one designed to produce an effect by heat, light, sound, gas or smoke or a combination of these as the result of non-detonative self-sustaining exothermic chemical reactions. 22 Concerned with, involving or having the exact proportions for a particular chemical reaction.
32 to generate 0.08kg to 0.13kg of CO for every 1kg of potassium nitrate, resulting in potential exposure to CO of between 160,000 and 290,000ppm in the concentrated, undiluted stream of aerosol from the generator’s outlet. 1.20.6 Aerosol generator practical trials On 1 September 2020, practical trials were carried out at the HSE Science and Research Centre to determine the combustion products and temperatures reached during the activation of a FirePro FP5700 aerosol generator. The combustion trials took place in a 27m3 test cell with an array of thermocouples and gas sampling points at a series of distances from the aerosol generator (Figure 20). Three FP5700 generators, including the unit from Resurgam that had not fired, and two FP2000 generators were activated. Within the volume of the test cell, the three FP5700 generators created 9700ppm, 9900ppm and 11600ppm of CO gas, respectively. The FP2000 generators each produced 2206ppm of CO. The pyrotechnic loading density in the 27m3 test cell measured 195g/m3 for the FP5700 generators and 68.5g/m3 for the FP2000 generators. The temperature of the stream of gases discharged from the FP5700 generators was also monitored and the following values were calculated against FirePro’s documented temperature/distance conditions:
● L1, temperature not exceeding 400°C = 0.2m
● L2, temperature not exceeding 200°C = 1.0m
● L3, temperature not exceeding 75°C = 3.25m These results demonstrated that, for each of the temperature points, the measured temperature values in the HSE trials exceeded the distance values given in FirePro’s documentation (Figure 12). The distance for the key temperature value of 75°C for the FP5700 generators was exceeded by 61% and measured 3.25m instead of 2.0m. Figure 20: Set up of HSE condensed aerosol generator test Image courtesy of Health and Safety Executive (www.hse.gov.uk)
33 Oxygen levels within the test cell were also monitored and fell to 19.1 percent by volume. 1.20.7 Health and Safety Executive technical review Following its tests and trials, the HSE undertook a full technical review of FirePro’s aerosol generator system, which considered the theoretical analysis, trial results and documentary evidence review. It concluded that:
● FirePro’s description of the aerosol generators as non-pyrotechnical was inappropriate.
● The solid compound’s composition was fuel-rich, with the potential to yield high levels of CO.
● FirePro’s combustion testing was based on burning in the open air; such test results were not relevant to the combustion conditions in the enclosed FirePro unit. Regulatory bodies appeared to have accepted the manufacturer’s claims that CO production was low.
● HSE testing had demonstrated that FirePro aerosol generators produce high concentrations of CO, that could significantly reduce the chance of escape.
● There should be prominent warning about the toxicity of fume products.
● Stream temperatures and the range of thermal effects appear to have been underestimated in the FirePro manuals. 1.20.8 Post-accident trials conducted by FirePro In January and February 2021, FirePro commissioned its own trials to assess CO production23. These took place at the Albarubens SRL laboratory in Saronno, Italy and produced two reports. MAIB inspectors did not attend due to COVID-19 travel restrictions that were in place at the time. In the first trial an FP5700 generator was discharged in a sealed space of 57m3 volume to create the design concentration of 100g/m3 of condensed aerosol. Fourier transform infrared spectroscopy sampling equipment measured a CO level of 2400ppm, which was evenly distributed in the space. FirePro’s second set of trials took place in a specially constructed test chamber with a 15.1m3 internal volume. A fan mixed the atmosphere in the chamber with two CO sampling points. FP2000, FP1200 and FP500 aerosol generators were used in the trials. The FP2000 generators produced 3213ppm of CO at 132.5g/m3 density and the FP1200 produced 2786ppm CO at 79.4g/m3 density. The FP500 trial activated three F500 aerosol generators simultaneously in the sealed chamber, which resulted in 2776ppm of CO at 99g/m3 density. 1.21 EFFECTS OF EXPOSURE TO CARBON MONOXIDE GAS CO is a toxic, colourless, odourless, flammable gas produced as a by-product of combustion. When inhaled, CO binds with blood haemoglobin to form carboxyhaemoglobin that binds more efficiently to blood cells than oxygen, preventing the carriage of oxygen around the body. 23 The temperature zones and length of discharge plume were not monitored in the FirePro trials.
34 The workplace short-term exposure limit24 (15-minute reference period) for CO is 100ppm. Table 1 describes the physiological effects of CO on humans at various concentration levels. Carbon monoxide concentration (ppm) Physiological effects 1500 Headache after 15 minutes, collapse after 30 minutes, death after 1 hour 2000 Headache after 10 minutes, collapse after 20 minutes, death after 45 minutes 3000 Maximum exposure for 5 minutes, danger of collapse in 10 minutes 6000 Headache and dizziness in 1 to 2 minutes, danger of death in 10 to 15 minutes 12800 Unconscious after 2 to 3 breaths, danger of death in 1 to 3 minutes Table 1: Effects of carbon monoxide exposure (NORSOK Standard Z-013) Blood toxicology describes blood carboxyhaemoglobin levels as a percentage, which is a function of both the concentration level and exposure time. Table 2 describes the physiological effects of CO on humans based on their blood carboxyhaemoglobin levels. The apprentice engineer’s blood carboxyhaemoglobin level was 31.7%. Blood carboxyhaemoglobin levels (%) Physiological effects 5-10 Visual light threshold slightly increased 10-20 Tightness across forehead and slight headache, breathlessness, abnormal vision 20-30 Headache, easily fatigued, impaired judgement, possible dizziness and dim vision, impaired manual dexterity 30-40 Severe headache with dizziness, nausea and vomiting 40-50 Headache, collapse, confusion, fainting on exertion 60-70 Unconsciousness, convulsions, respiratory failure and death 80+ Rapidly fatal Table 2: Effects of carboxyhaemoglobin in blood25 24 HSE publication EH40/2005 Work Place Exposure Limits - Containing the list of workplace exposure limits for use with the Control of Substances Hazardous to Health Regulations 2002 (as amended). 25 Health and Safety Executive - SPC/Tech/OSD/30 - Indicative human vulnerability to hazardous agents, paragraphs 74 & 75.
35 1.22 HEALTH AND SAFETY MANAGEMENT 1.22.1 Overview The primary piece of legislation covering occupational health and safety in the United Kingdom is the Health and Safety at Work etc. Act 1974, as amended (HSW Act). It is based on the principle that those who create risks to employees or others in the course of carrying out work activities are responsible for controlling those risks. An employer has a general duty to ensure, so far as reasonably practicable, the health and safety of its employees and anyone else who may be affected by their work activities. Secondary legislation also applied under the HSW Act to the work being undertaken in Resurgam’s engine room. This included The Management of Health and Safety at Work Regulations 1999, which required employers to carry out risk assessments. Employers with five or more employees were required to record significant findings of their risk assessments. 1.22.2 W. Stevenson and Sons Limited Stevenson operated two safety management systems, one for its vessels and crew and one for its shore activities. The company’s managing director had overall responsibility for the safety management systems. The role of the health and safety manager was to coordinate health and safety activities on board Stevenson’s vessels, in its workshops and on its premises. The health and safety manager was appointed the fleet’s designated person responsible for:
● Ensuring the safe operation of each company vessel.
● Providing a link between those in shore-based operations and vessels.
● Monitoring the safety and pollution aspects of the operation of each vessel.
● Ensuring adequate resources and shore-based support are applied as required. [sic] The shore workers safety induction manual provided an overview of the safety requirements and site rules that all workers must abide by. It instructed workers to refer to the company’s Health & Safety Handbook and its site-specific risk assessments before work started. It also stated that: All W. Stevenson & Sons Ltd employees and contractors must use the clocking card system when accessing and leaving site. [sic] The Ocean Engineering installation technicians were not given a site safety brief and did not clock in and out when accessing and leaving the vessel. A specific risk assessment was not completed for the installation of the FirePro system on board Resurgam. 1.22.3 Ocean Engineering (Fire) Limited Ocean Engineering had documented safety guidance for its employees and safety was included in its induction training process. The documentation provided to MAIB during its investigation included a risk assessment for the installation of the FirePro system (Figure 21). The FPX103C control panel was also used, under a different brand name, for Stat-X systems in marine applications. For Stat-X systems, the panel could support six aerosol generators.
36 Figure 21: FirePro control panel risk assessment The FirePro risk assessment identified the accidental discharge of the system as a hazard and stated that all persons on board a vessel could be affected by such an event. Ocean Engineering assessed the likelihood of an accidental discharge to be low but the potential consequence to be major. The control measure stipulated in the risk assessment to mitigate the consequences of the hazard to medium and the risk rating from medium to low was: Ensure nobody in protected space when system is being made live. Ocean Engineering had a generic method statement that detailed 19 steps for the installation26 of an aerosol system (Figure 22). The initial steps required the installers to report to an onsite supervisor and ensure the system was electrically isolated and tagged out before commencing work. Steps 9 to 17 stated that the installer should:
Check continuity of wiring between cannisters and panel
Connect the panel to the power supply (without cannisters connected)
Connect cannisters
Check for faults
Disconnect cannisters
Carry out test of panel to ensure correct alarms are given
Carry out test of panel to ensure firing mechanisms are operational
Power down panel and reconnect cannisters
Power up panel and check for faults [sic] 26 The method statement refers to the term ‘cannister’; for consistency, this report refers to ‘aerosol generator’ throughout.
37 Figure 22: Ocean Engineering’s generic method statement for the installation of an aerosol system Image courtesy of Ocean Engineering (www.oceanengineering.co.uk) On completing the work, step 19 of the method statement required the installers to report to the vessel supervisor and inform them of the status of the system. Ocean Engineering also had a work instruction in place for working on board ships, the purpose of which was to ensure procedures for safe working were met. The work instruction required the installation supervisor to contact the relevant ship’s officer or maintenance manager and discuss the scope of work to be carried out and the safety issues associated with it. The installation technicians were unfamiliar with the risk assessment and did not take a copy of this or the method statement to Resurgam; neither did they discuss the documents with Stevenson’s engineering manager or engineering project manager. 1.23 USE OF CONTRACTORS AND SUBCONTRACTORS The HSE’s leaflet INDG368 Using contractors – a brief guide helped employers understand their duties towards contractors and subcontractors and how best to discharge them. The guide directed companies to satisfy themselves that the contractors they chose could do the job safely and listed examples of questions to ask them, including:
● What arrangements will you have for managing the work?
● Will you be using subcontractors?
● What is your recent health and safety performance?
38
● Do you have a written health and safety policy?
● Can you provide existing risk assessments for similar jobs?
● What qualifications, skills and experience do you have in this type of work?
● What health and safety information and training do you provide for your workers? It further suggested asking a potential contractor whether they would produce a safety method statement for the job to support safe working practices and minimise risks to health. The guide also explained the importance of the contracting company meeting with the contractor to consider any risks from each other’s work that could affect the health and safety of the workforce or anyone else. It went on to emphasise that measures to control risk and how the work would be managed and supervised must be agreed before the work started. 1.24 WORKING IN CONFINED SPACES Although located within the structure of a ship, engine rooms and machinery spaces are usually ventilated and are not considered to be enclosed or confined spaces. The Confined Spaces Regulations 1997, applicable to shore-based workers and other workers when the vessel is not under the control of a master or their representative and is undergoing maintenance, defined a confined space as: ...any place, including any chamber, tank, vat, silo, pit, trench, pipe, sewer, flue, well or other similar space in which, by virtue of its enclosed nature, there arises a reasonably foreseeable specified risk. Guidance provided by the HSE in its L101 Safe work in confined spaces – Confined Spaces Regulations 1997 – Approved Code of Practice (ACOP) and guidance, added that: ...a confined space must have both of the following features: a) It must be a space which is substantially (though not always entirely) enclosed; and b) one or more of the specified risks must be present or reasonably foreseeable. The specified risks were: a) serious injury to any person at work arising from a fire or explosion; b) without prejudice to paragraph (a) i. the loss of consciousness of any person at work arising from an increase in body temperature; ii. the loss of consciousness or asphyxiation of any person at work arising from gas, fume, vapour or the lack of oxygen; c) the drowning of any person at work arising from an increase in the level of liquid; or d) the asphyxiation of any person at work arising from a free flowing solid or the inability to reach a respirable environment due to entrapment by a free flowing solid.
39 The ACOP also cautioned that: a place not usually considered to be a confined space may become one if there is a change in the conditions inside or a change in the degree of enclosure or confinement, which may occur intermittently. For example, an enclosed space may be free of contaminants and have a safe level of oxygen but the work to be carried out in it may change this… The ACOP contained a flow chart (Figure 23) to help employers and employees identify if an area should be considered a confined space. Regulation 4 of the Confined Spaces Regulations 1997 referred to working in confined spaces. The ACOP required the development and use of safe systems of work that considered elements such as supervision, communications, ventilation, access, emergencies and rescue. Regulation 5 required that arrangements be put in place for the rescue of persons in the event of an emergency situation. The arrangements were to cover: rescue and resuscitation equipment, raising the alarm and rescue, safeguarding the rescuers, fire safety plant control, first aid, public emergency services and training. Figure 23: Approved Code of Practice flow chart: is the area a confined space? Image courtesy of Health and Safety Executive L101
40 1.25 PREVIOUS SIMILAR ACCIDENTS 1.25.1 Previous inadvertent discharges of fixed fire-extinguishing systems during Ocean Engineering (Fire) Limited servicing activities Ocean Engineering had experienced several fixed fire-extinguishing system accidental discharges before the accident on board Resurgam. Earlier in 2019, the lead technician for the Resurgam installation accidentally activated a Stat-X aerosol generator while testing the system during a routine service on another vessel. He had forgotten to isolate one of the system’s two generators before testing the activation process. The lead technician had experienced another accidental discharge of a condensed aerosol system but did not know why it happened. Neither incident had been reported to the MAIB. On 23 August 2011, a shore-based service engineer was seriously injured on board the tug SD Nimble when six CO2 cylinders were accidently discharged. The engineer was employed by Ocean Engineering and was testing components of the vessel’s fixed CO2 fire-extinguishing system. The MAIB investigation report (MAIB report 23/201227) found that the release of the CO2 was caused by a failure to isolate the pilot lines from the system control cabinet. It concluded that this omission was likely to have been the result of an incorrect plan of action rather than a misidentification of the system’s components. The investigation also found that the service engineer’s training was ineffective, and that the tug’s crew and service engineers worked in isolation, which led to a hazardous situation. Ocean Engineering reported that it had fully implemented an MAIB recommendation to improve the monitoring of its service engineers and the adoption of safe systems of work. 1.25.2 Other reported incidents of discharges of in service FirePro systems following this accident In September 2020, a FirePro system was activated without warning on a fish feed barge with people in a compartment. Everyone escaped without suffering any ill effects. The system was an automatic initiation system type, activated by the fire detection system. However, the fire detection system had not been activated before the incident occurred. Personnel were working in the compartment without operating the FirePro system isolation switch. In November 2021, a FirePro system unintentionally activated on a twin-hulled workboat in one of the engine compartments, which was unmanned at the time of the release. An examination of the system by the manufacturer’s service engineers found that no apparent reason could be determined for the activation of the FirePro system. 27 https://www.gov.uk/maib-reports/accidental-discharge-of-carbon-dioxide-when-testing-the-fixed-co2-fire- extinguishing-system-on-tug-sd-nimble-at-hm-naval-base-faslane-scotland-with-1-person-injured
41 SECTION 2 – ANALYSIS 2.1 AIM The purpose of the analysis is to determine the contributory causes and circumstances of the accident as a basis for making recommendations to prevent similar accidents occurring in the future. 2.2 OVERVIEW Stevenson’s apprentice engineer, Conor Moseley, died because he was working in Resurgam’s engine room when three condensed aerosol generators accidentally discharged during the installation of the vessel’s FirePro fixed fire-extinguishing system. He collapsed during his attempt to escape from the engine room and succumbed to the adverse effects of the atmosphere created by the pyrotechnical release of the condensed aerosol before he could be rescued. This section of the report will examine the causes and circumstances of the accidental discharge of three condensed aerosol generators during the installation of a FirePro fixed fire-extinguishing system on board Resurgam. The reasons why the apprentice engineer was unable to escape from the engine room and died will also be analysed. The underlying factors that contributed to both events will also be discussed. 2.3 THE ACCIDENTAL DISCHARGE OF THE AEROSOL GENERATORS The Ocean Engineering technicians were in the latter stages of installing and commissioning Resurgam’s FirePro fire-extinguishing system when three of the system’s four aerosol generators accidentally discharged into the engine room space. The system’s fire protection control panel, PSU, pre-activation alarm warning beacons and electrical cabling were all in place, and the aerosol generators had been mounted in their brackets ready to be plugged into the firing circuit. Power had been supplied to the control panel and the protected space alarm warning beacons had been tested. The final steps were to check that the fire protection control panel identified faults in the fire suppression circuit and to conduct a system activation test using simulation lamps. This was not completed and the aerosol generators were instead plugged into the firing circuit. It is unknown why the simulation test was not completed. However, the installation technicians neither had the equipment to carry out the test or detailed installation guidance with them. It is possible that the test was not carried out through lack of experience and the disinclination to return to Ocean Engineering offices to collect the equipment. The investigation’s onsite examinations of the FirePro system installation on board Resurgam and subsequent laboratory tests found no electrical component or circuit connection faults. As a result, several hypotheses were explored to identify the most likely cause of the accidental discharge. These included the potential effects of induced currents from adjacent power cables and circuit earth faults. One hypothesis considered the deliberate or inadvertent activation of the system by pressing the manual activation button after the power had been supplied to the fire protection control panel and before the generators had been connected to the firing circuit. To explore this and other possible scenarios, Resurgam’s installation was reconstructed at the HSE’s Science and Research Centre using the as fitted electrical components and simulation lamps instead of aerosol generators. In-line
42 switches were added to the circuit to simulate connecting and disconnecting the aerosol generators; the initial state was for the switches to be in the open position to simulate the aerosol generators disconnected from the circuit. Power was applied to the fire protection control panel, the amber fault and green power LED illuminated and the internal sounder activated. The manual activation button was pressed and the control panel was activated after the spin-down delay time had elapsed. The red activation LED flashed for 5 seconds. The power to the fire suppression circuit was active. The fire protection control panel remained in its activated state until the mute/reset button was pressed and held in for 5 seconds or the power to the fire protection panel was removed. The simulation lamps were connected to the firing circuit by closing their associated switches in turn. The first three simulation lamps did not illuminate when they were connected to the firing circuit in the same sequence as the generators on board Resurgam. All four simulation lamps illuminated when the fourth light was connected. The trial validated the hypothesis; however, because the undischarged generator activated as designed during later trials it was unclear why only three generators discharged on board Resurgam. It is possible that this happened because the lead technician unplugged generator 4 before generator number 2 could be triggered (Figure 24). Previous procedural errors by Ocean Engineering technicians during the installation and maintenance of fixed fire-extinguishing systems had resulted in accidental system discharges [Section 1.25.1]. However, the investigation found no evidence to indicate that the manual activation button had been deliberately or accidentally pressed during the installation and commissioning processes on board Resurgam. Furthermore, had the control panel’s manual activation button been pressed and not reset, the trials showed that: the control panel’s amber fire suppression circuit fault and red activation LEDs would have been illuminated; the green power on LED would have been single flashing; and the internal audible alarm would have sounded in the control panel in the wheelhouse. This was inconsistent with the accounts given; the installers had tested the pre-activation alarm but this was independent of the control panel’s activation and fault detection circuits. There was no one reported to be in the wheelhouse immediately before or during the accident; both installation technicians were in the engine room space when the generators began to discharge and therefore no one saw which LEDs were illuminated in the moments before the fourth generator was connected. The post-accident trials suggested that the most likely cause of the discharge was the inadvertent or deliberate activation of the system’s firing sequence when the disconnected generators were subsequently connected during the installation process. Regardless of the direct cause, it was evident that Resurgam’s installation design and system commissioning processes differed from those prescribed by FirePro and would have contributed to the accidental discharge. 2.4 EVACUATION OF THE ENGINE ROOM FOLLOWING THE ACCIDENTAL DISCHARGE Resurgam had one escape route from its engine room, which was via the compartment’s normal access ladder located on the starboard side of the main engine. When the generators started to discharge, the Stevenson engineers were
43 Figure 24: Sequence the FirePro generators were connected to the firing circuit during the installation For illustrative purposes only: not to scale
44 working on the port side of the engine, the lead installation technician was directly aft of them, and the trainee technician was in the lobby area at the top of the access ladder. When the lead technician heard the first generator start to discharge, he knew what was about to happen and immediately jumped over the engine gearbox and climbed up the access ladder. Both he and the trainee technician escaped onto the open deck without inhaling significant amounts of the FirePro condensed aerosol. The Stevenson engineers had little or no understanding of what was going on and had a further distance to cover to reach the access ladder. The engine room space filled rapidly with hot condensed aerosol particles and pyrotechnic gases when the system activated. The aerosol was opaque and reduced visibility within the space to almost zero, which would have disorientated the engineers and adversely affected their ability to escape. Both Stevenson engineers inhaled significant amounts of aerosol particles and hot gases as they made their way to the access ladder, which ultimately led to the collapse and death of the apprentice engineer. Given that the lead technician heard a generator activating behind him when he plugged in generator 4, it is likely that generator 3 activated first, followed by generator 4 then generator 1 adjacent to the access ladder. The location of the Stevenson engineers when working on the engine exhaust system placed them less than 2m from two of the discharging aerosol generator outlets on the port side of the engine room. Their escape route forward of the main engine took them into the direct path of the discharging FP5700 generator 1 adjacent to the access ladder on the starboard side of the engine room (Figure 25). It is possible that the apprentice engineer was closest to the generator discharges on the port side of the engine room when the system was activated. It is likely that his face was in the direct path of the discharging generator, mounted just under 1m from the access ladder, immediately before he collapsed. At this distance, and based on the results of the HSE trials, the discharge stream temperature would have been about 120°C and would account for his severe inhalation injuries. Close proximity to the discharging aerosol generators for even a brief period would result in exposure to high levels of CO. Given that the apprentice was unconscious but breathing when his workmates first attempted to rescue him, it is considered most likely that he was initially exposed to a concentration of CO in excess of 12800ppm (Table 1) when inhaling the discharging condensed aerosol stream. The apprentice would have been exposed to sustained lower levels of CO for about 20 minutes afterwards, probably around 2400ppm28. He could not be resuscitated when he was removed from the space about 20 minutes later. The apprentice collapsed at the bottom of the ladder because he was overcome by the effects of inhaling large quantities of hot condensed aerosol particles and pyrotechnic combustion gases. The postmortem toxicology report stated that his carboxyhaemoglobin levels were high but this alone would not have been fatal. It was the combination of severe inhalation injuries, CO poisoning and reduced oxygen levels that caused his death. The Stevenson engineer, who made a determined attempt to guide the apprentice out of the space, suffered a reaction following his 28 The closest comparison with the accident was FirePro’s post-accident test of an FP5700 generator, which created a sealed space CO level of 2400ppm and 100g/m³ aerosol density.
45 exposure and was immobilised for a short period after escaping onto the open deck. It is fortunate that he did not also succumb within the protected space and fail to escape. Figure 25: Escape route through aerosol discharge streams For illustrative purposes only: not to scale Escape route Aerosol discharge stream Ladder 1 2 4 3 Main engine Aerosol generator unit (FP5700) Aerosol generator unit (FP2000) Stevenson engineer Stevenson apprentice Trainee technician Lead technician Engine gearbox FORWARD 2.5 EMERGENCY RESPONSE The first responders to the emergency were Stevenson employees working on board another vessel, who arrived to investigate the white aerosol cloud emanating from Resurgam’s engine room. Their initial actions, and those of the Stevenson health and safety manager, were brave and well-intentioned but unsuccessful in rescuing the apprentice engineer. The first responders put themselves in danger by entering the enclosed engine room without respiratory protection and made multiple entries despite being driven back by the noxious atmosphere. The situation was only brought under control when the emergency services arrived at the scene and fire and rescue service officers employed breathing apparatus to recover the apprentice engineer from the engine room.
46 The personnel working on board Resurgam and those responsible for the management of safety during the vessel’s maintenance period had not anticipated the likelihood of an accidental discharge of the FirePro system and did not understand the potential consequences of such an event. The Ocean Engineering technicians thought that discharged aerosol was non-hazardous, which might explain the 10-minute delay in calling the emergency services. The first people to respond did have access to a compressed air breathing apparatus set, which was found discarded on Resurgam’s open deck. However, none of them had been trained in the use of compressed air breathing apparatus nor had any knowledge of how to operate the set. As a result, the breathing apparatus set was not used. Those working on board Resurgam were not fully aware of the risks associated with an accidental discharge of the FirePro system and had not been briefed on the initial actions to take in the event of an emergency. They were therefore unprepared to respond to the situation. The apprentice engineer was unconscious but still breathing when the first attempts were made to rescue him. It is unknown whether he could have survived if the emergency services had been alerted earlier, but his chances of survival would have significantly increased had the initial rescue attempts been successful. 2.6 HAZARD AWARENESS In the process of acquiring technical approvals for its product, FirePro sought to identify, through testing and laboratory evaluation, the hazards associated with both the solid compound and the aerosol it created on ignition. The tests focused on the condensed aerosol’s respirable particles when evenly distributed at the design density. Although the results varied dependent on the circumstances of the trial, the consensus was that the solid compound was largely harmless and that the aerosol’s by-products were primarily CO2, water vapour and low levels of other, harmless, gases. Based on this evidence, FirePro marketed the solid compound as harmless and the post-combustion aerosol as safe to breathe, with the oxygen content of the compartment largely unaffected. This assessment of low risk levels associated with the product was reflected in FirePro’s MSDS, which was reproduced in its entirety as part of Ocean Engineering’s local documentation. However, the HSE’s post-accident analysis demonstrated that there was a significant CO hazard, particularly in enclosed environments where CO production was greater than found in open air trials. It also identified that the discharge of the aerosol depleted the oxygen levels within the protected space. The inadvertent or accidental discharge of FirePro and other condensed aerosol fixed fire-extinguishing systems had occurred on other installations. It was also widely recognised that the likelihood of this happening was highest during initial installation and system maintenance. However, based largely on FirePro’s assessment of the research it commissioned and the information provided in its MSDS, the hazards associated with an accidental discharge into a protected space that was occupied by people was limited to the loss of visibility and the effects of heat and noise generated during the combustion process. Despite FirePro’s marketing and safety assessments, several external organisations, including the MCA and USCG, were aware that the pyrotechnic combustion of the solid compound generated significant levels of CO and that the aerosol particles should be treated as a respirable dust. Although the MCA Certificate of Inspection
47 and Tests referred to the aerosol forming process as non-pyrotechnic and repeated many of the assurances given by FirePro in its guidance documents, unlike other marine certifying authorities, the agency only approved the use of the FirePro system in normally unoccupied spaces. Furthermore, the MCA’s MSIS 12 guidance to its surveyors specifically warned of the potential inhalation hazards presented by the aerosol and made particular reference to the production of high levels of CO. However, the hazards listed in MSIS 12 were not listed in section 2 of the Certificate of Inspection and Tests and there was no mention of CO in the certificate. In describing the aerosol generators as non-pyrotechnic, FirePro alluded to the fact that the transformation of the solid compound to a gaseous aerosol was not an exothermic reaction. This led to the conclusion that CO was not a by-product caused by the aerosol generator’s activation. The solid compound’s ignition and combustion process required oxygen to sustain it; CO gas is produced if the available oxygen is insufficient to fully support the solid compound’s combustion. FirePro was aware of the observations made and warnings given by the MCA to its surveyors several years before the Resurgam accident. It was apparent that the manufacturer applied a degree of selective bias when it chose to omit the safety messages published in MSIS 12 from the excerpts used in the marine annex of its user manual. Consequently, installers of the FirePro system, such as Ocean Engineering, may not have been aware of all the actual hazards posed by the activated aerosol. The FirePro condensed aerosol system can undoubtedly provide effective fire- extinguishing capability; however, this accident highlights the potentially fatal hazards of being exposed to the discharge from an aerosol generator, especially at close range. The apprentice engineer almost certainly inhaled the full products of combustion during his attempt to escape, and the atmosphere within Resurgam’s engine room was unable to support life for many minutes after the discharge was complete. The dangers of inhaling the condensed aerosol particles and hot gases generated during discharge are clear and should be highlighted in the FirePro MSDS and guidance documents. Without easy access to this information, installers, service technicians, ship operators and crew cannot properly assess the risk and put appropriate control measures in place. 2.7 INSTALLATION STANDARDS 2.7.1 System installation The number of FirePro aerosol generators required for Resurgam’s fixed fire- extinguishing system was calculated by Ocean Engineering based on the dimensions of the spaces to be protected. For the FirePro system to extinguish a machinery space fire, the condensed aerosol had to achieve the predetermined density of 100g/m3. This was done by calculating the mass of solid compound needed to produce the required aerosol density and then choosing the appropriate number and size of aerosol generators. The number of aerosol generators that could be used on board Resurgam was limited to four, which was the maximum number of generators the FPX103C fire protection control panel was designed to activate. Once the dimensions of Resurgam’s engine room spaces had been measured and the net volume calculated, Ocean Engineering’s operations director used FirePro’s planning spreadsheet to determine that 17940.00g of solid compound was needed to protect the space. The only way to achieve this using the FPX103C control panel
48 was to install one FP2000 and three FP5700 aerosol generators. However, this configuration was flawed from the outset given the dimensions of the engine room spaces. Warnings on the calculation spreadsheet not to use the FP5700 generator because the height of the space was insufficient were ignored and they were not visible in the extracts of the spreadsheet included in Resurgam’s FirePro installation manual. The protected space was split over two decks, as the engine room spaces could not be isolated from each other. The main engine machinery space, which constituted 65% of the net volume, was on the lower deck level and the lobby area and winch room were on the deck above. However, all four generators were mounted in the main engine space. This would almost certainly have resulted in the accumulation of much higher concentrations of aerosol particles and combustion gases than intended in the main engine space. It would also have reduced the likelihood of design concentrations being reached in the lobby area and winch room. The stated discharge stream length of the FP5700 aerosol generator was 8m and, under internationally set discharge temperature limits, the outlet should have been mounted no closer than 2m from escape routes and areas where people might be present. The discharge stream length of the FP2000 aerosol generator was 3.5m and the outlet should have been mounted no closer than 1.5m from areas where people might be present. These limits were not met on board Resurgam and all four generators were mounted close to areas where people could be expected to occupy and near floor plates that would be used as an emergency escape route. Two of the generator outlets were pointing directly toward the area where the Stevenson engineers were working and one was positioned at head height level less than 1m away from the floor plate area at the bottom of the engine room’s main access ladder, which was the only escape route. The positions of the generator units contravened the discharge temperature/ distance rules stipulated by the IMO and set out in several marine approval authority certificates for escape routes and areas that people might occupy. The inappropriate positioning of the generator outlets might have been the consequence of the installers’ lack of knowledge; however, it would almost certainly have been influenced by the size of the compartment and the space available to mount them. Other system installation anomalies were identified during the investigation. These included:
● The use of the FPX103C control panel with its DIP switches set in automatic mode with a 5-second spin-down delay.
● The use of inline coupling plugs to connect the aerosol generators to the firing circuit.
● The use of non-shielded cabling and a combination of three-core and two- core cables in the firing circuit. Resurgam’s fixed fire-extinguishing system was designed for manual activation only. The MCA’s Certificate of Inspection and Tests listed the FPX103C and FPX104C control panels as suitable for use in marine applications. The MCA’s certificate explained that the FPX103C control panel was suitable for both manual and automatic activation systems, and that the FPX104C control panel was for manual activation systems only. Ocean Engineering used the FPX103C control panel, but the post-accident examination of the control panel revealed that the DIP switches
49 were set to an automatic mode position rather than the manual mode position. The rationale for this decision is unknown. At the time of the activation of the aerosol generators the full installation had not been completed and the system was not fully commissioned. It is possible that the DIP switches may have been set to the manual position at the time of the accident. It is also possible that the 5-second delay was intended to provide an additional delay between opening the cover of the control panel and the activation of the fire suppressant system. If this was the case, the decision to set a 5-second DIP switch delay was illogical; the condition of most marine approvals was for a minimum activation delay of 20 seconds for an automatic system. Ocean Engineering’s use of inline coupling sockets to plug the aerosol generators into the firing circuit appeared to be a local arrangement that made it easier to connect and disconnect generators. However, it also made it possible to connect and disconnect the generators to the control panel with the power supply turned on. The electrical cables used for the FirePro system on board Resurgam did not comply with the standards set out in FirePro’s guidance specifications and varied randomly between two-core and three-core cabling. Post-accident examinations of the electrical circuits concluded that these anomalies were not critical to the system’s operation; however, they were indicative of a lack of planning and attention to detail. FirePro had approved Ocean Engineering to install and service its fire-extinguishing systems. As such, it was expected to design bespoke systems for a wide range of vessels. Ocean Engineering was an established company with a third party approved quality management system. However, it did not produce detailed installation plans, accurate wiring drawings or a vessel-specific instruction and guidance manual that accurately reflected the system installation on board Resurgam. Furthermore, safety critical decisions relating to the location of aerosol generators were left to the judgement of the installation technicians while on site. Neither FirePro nor FirePro UK were required to have procedures in place to scrutinise and approve its authorised installers’ design calculations and installation plans. This function fell to the MCA as the approval authority for coded vessels. Resurgam’s fixed fire-extinguishing system installation did not meet the requirements and standards set by the IMO, marine certifying authorities or the equipment manufacturer. Given the size and layout of the protected space on board Resurgam, it is questionable whether a safe and compliant FirePro system could have been designed for the fishing vessel. Regardless, it is evident that the design of these systems can be very complex and it is therefore essential that detailed installation design plans are produced. These plans need to be properly scrutinised for compliance with the manufacturer’s guidance and other appropriate standards before being submitted for approval to the MCA or other certifying authorities. 2.7.2 Installation and commissioning process on board Resurgam Ocean Engineering did not produce a comprehensive risk assessment or method statement for the installation, commissioning and maintenance of the FirePro system, and a specific risk assessment had not been carried out for the Resurgam project. However, a risk assessment for the installation of a FirePro system and a generic method statement for the installation of condensed aerosol systems did exist.
50 The two Ocean Engineering technicians were not involved in the planning and design of Resurgam’s fire-extinguishing system and had not been given Ocean Engineering’s locally produced documentation or the equipment manufacturer’s installation and commissioning instructions. Because of this, the lead technician had to use his personal judgement to position the control panel in the wheelhouse and aerosol generators in the engine room. He also had to rely on his previous experience to commission the system. To check the function of the fire suppression circuit fault alarm, the lead technician powered up the system with the aerosol generators disconnected. This caused the fire suppression fault LED on the fire protection panel to illuminate and the panel’s audible alarm to sound. The aim of connecting the generators with the power still on was to clear the alarm and therefore prove the panel’s fault identification function. This process was not in accordance with FirePro guidance (Annex A), which stated that the fault test should be conducted using simulation lamps and that the power to the system should be isolated whenever connecting and disconnecting the generators. However, the steps taken by the technicians did broadly follow those set out in Ocean Engineering’s generic aerosol system installation method statement. The lead technician had been directly involved in two previous condensed aerosol generator accidental discharges and was aware of the risk of this event occurring during the installation, commissioning and maintenance of the system. Although he was unaware of the potentially fatal consequences of an accidental discharge, when he heard the first generator begin to ignite he knew the engine room spaces were about to fill rapidly with dense aerosol particles and immediately ran to the escape ladder. This hazard was recognised in the FirePro risk assessment and the control measure identified was the removal of all personnel from the protected spaces. Despite the lack of awareness of the respirable hazards posed by the aerosol discharge, the implementation of this control measure would have prevented the loss of life. 2.8 MARITIME AND COASTGUARD AGENCY OVERSIGHT As the certifying authority for fishing vessels less than 24m in length, the MCA approved the FirePro system for use in fishing vessel engine rooms and maintained oversight of the planning and installation process. A critical component of the approval process to fit the FirePro system was the requirement to notify MCA of the intent to install the system and submit plans ahead of the installation. The installation also had to be completed to the satisfaction of an MCA surveyor. The MCA certificate of approval required that the installation was in line with the manufacturer’s manual. Stevenson advised the MCA of its intent to install a FirePro system three working days before Ocean Engineering started the FirePro installation, but Ocean Engineering did not submit any plans or drawings for approval. This omission and the short timescale before Ocean Engineering began the installation denied the MCA the opportunity to scrutinise and challenge Ocean Engineering’s flawed system design. The MCA, on receiving notification of the intention to install a FirePro system, did not prompt Stevenson to submit plans for prior approval before the installation work commenced. The MCA’s MSIS 12 contained important information to aid its surveyors when inspecting condensed aerosol systems. However, the hazards listed in MSIS 12 were not listed in section 2 of the Certificate of Inspection and Tests.
51 2.9 INSTALLATION STANDARDS Without a national or international training standard for the installation of condensed aerosol fire-extinguishing systems on coded marine vessels, it falls to employers to ensure training standards are developed and maintained for their technicians. Ocean Engineering’s operations director managed the company’s training programme, which was not based on agreed competencies; instead, trainees doubled-up with more experienced technicians before a verbal assessment that relied on the operations director’s knowledge of the FirePro system. Moreover, the core competency of Resurgam’s lead technician was that of an electrician. This installation required specific knowledge of the aerosol generators’ characteristics and fitting requirements. Without general arrangement and electrical drawings, supported by a detailed method statement and risk analysis, Ocean Engineering’s director could not give assurance to either Stevenson, as the operator, or the MCA, as the approving authority, that the FirePro system was installed in accordance with the manufacturer’s design intent. As a comparative analysis, installers of land-based FirePro systems were required to complete a nationally-accredited training programme through either BAFE or LPCB. Such schemes added a layer of assurance that the installers met the recognised competence standard required by FirePro for its accredited installation companies. Correct installation of critical safety systems such as the FirePro aerosol generators required a consistent and high standard of competence. Without a national or internationally agreed standard, consistency of safe installation could not be assured for coded marine vessels. 2.10 WORKING WITH CONTRACTORS AND SAFE SYSTEMS OF WORK Ocean Engineering did not share its generic installation risk assessment or method statement with Stevenson. Stevenson’s engineering manager and engineering project manager were familiar with Ocean Engineering but did not hold safety discussions with its installation technicians or request sight of its risk assessments or method statement. A method statement describes in a logical sequence exactly how a job is to be carried out in a safe manner and without risks to health. An associated risk assessment should consider all the risks identified and the measures needed to control those risks. This allows the job to be properly planned and resourced. Ocean Engineering had not prepared a specific risk assessment or method statement for the installation and commissioning of the FirePro system on Resurgam, nor did its technicians understand the risks associated with installing the system. In this case, a discussion between Stevenson and Ocean Engineering about the risks and control measures for the installation of the FirePro system might have ensured that no personnel were in the engine room when the generators were connected, and when power was first applied to the system. Similarly, discussions between Stevenson and Ocean Engineering should have alerted all parties to the need to put in place a capability to rescue people from the space if the installers intended to connect and disconnect the aerosol generators with the power on. Although Resurgam’s engine room was substantially enclosed it was not considered a confined space under normal circumstances because it had adequate ventilation. However, the work being undertaken by Ocean Engineering
52 presented the risk of introducing one of the specified risks listed in the Confined Spaces Regulations 1997 i.e. the loss of consciousness or asphyxiation of any person at work arising from gas, fume, vapour or the lack of oxygen. The controls required under such circumstances would again have increased the levels of safety applied and improved the workers’ preparedness to deal with any accidental discharge. Although Stevenson had a written policy and procedure for contractors working on its site, it did not have a robust formal process for the safety management and control of contractors working on its vessels; instead, reliance was placed on the health and safety manager or the engineering project manager talking to the contractors to ascertain what work was being undertaken and whether Stevenson needed to provide resources. There was no process to deconflict work in hazardous situations or identify risks. This accident demonstrates the importance that should always be placed on the sharing of safety information and understanding and agreeing safe systems of work to ensure that the opportunities to avoid serious accidents such as this are not lost. 2.11 NORMALLY OCCUPIED AND NORMALLY UNOCCUPIED SPACES Some marine certifying authorities had approved the FirePro and other condensed aerosol systems for use in normally occupied spaces. However, based on its assessment of the hazards presented during discharge, particularly the production of CO, the MCA only approved the system for use in normally unoccupied spaces on coded vessels. The definition that the MCA used for normally unoccupied spaces differed from that used by other bodies; it is arguable whether Resurgam’s engine room, winch room and lobby area met the criteria for a normally unoccupied space, especially during maintenance periods and refits when these spaces could be continually occupied. The FirePro system, along with other condensed aerosols, is very effective at extinguishing fires and almost certainly less hazardous to life than a CO2 system when discharged. However, this accident demonstrated the potentially fatal consequences of people being in a protected space during a release of this condensed aerosol system. It is therefore important that controls are put in place to minimise the risk to personnel from inadvertent activation of a FirePro system.
53 SECTION 3 – CONCLUSIONS 3.1 SAFETY ISSUES DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS
Stevenson’s apprentice engineer, Conor Moseley, died because he was working in Resurgam’s engine room when three condensed aerosol generators accidentally discharged during the installation of the vessel’s FirePro fixed fire-extinguishing system. [2.2]
The system was inadvertently activated because the FirePro condensed aerosol generators were connected to a live electrical system, initiating combustion. The manufacturer’s design and installation procedures were not followed, which would have contributed to the accidental discharge. [2.3]
The condensed aerosol generators discharged accidentally because the system’s fire protection control panel was in its activated state when the last generator was connected to the firing circuit. It could not be determined when or how the control panel was activated during the installation process. [2.3]
The apprentice engineer collapsed at the bottom of the ladder during his attempt to escape from the engine room because he was overcome by the effects of inhaling large quantities of hot condensed aerosol particles and pyrotechnic combustion gases. The combustion gases included high levels of CO, which along with the severe inhalation injuries contributed to his death. The other Stevenson engineer, who tried to help the apprentice engineer escape, suffered from the effects of exposure to the aerosol and was fortunate to escape. [2.4]
Those on board Resurgam and the first responders to the accident were unaware of the respiratory hazards posed by the aerosol and were therefore not properly prepared to deal with the emergency situation. [2.5]
The apprentice engineer’s chances of survival would have significantly increased if the initial rescue attempts had been successful. [2.5]
Despite being aware that the MCA’s guidance to surveyors warned about the potential inhalation hazards and high levels of CO associated with the aerosol, FirePro’s information and guidance documents and its MSDS did not accurately represent the hazards posed by the condensed aerosol particles and combustion gases produced during generator discharge. [2.6]
Resurgam’s fixed fire-extinguishing system installation did not meet the safety criteria set by the IMO, marine certifying authorities and the equipment manufacturer. In particular, the aerosol generator outlets were located too close to areas that people could be expected to occupy and to the escape route [2.7.1]
Given the size and layout of the spaces to be protected by the fixed fire- extinguishing system on board Resurgam, it is questionable whether a safe and compliant FirePro system could have been designed for the fishing vessel’s main machinery space. [2.7.1]
Ocean Engineering had not produced detailed installation plans, accurate wiring drawings or a vessel-specific instruction and guidance manual before the installation of the FirePro system. Installations can be complex and plans need to be properly scrutinised and approved by the equipment manufacturer before they are sent to the MCA or other certifying authorities for approval [2.7.1]
54
The system installation and its commissioning process were not carried out in accordance with the manufacturer’s guidance. This was because the installation technicians did not have access to clear plans and instructions and the lead technician relied on his previous experience and personal judgement while positioning the system components. [2.7.2]
An opportunity to identify flaws in Ocean Engineering’s system design was missed because the plans were not submitted to the MCA for approval. [2.8]
Correct installation of critical safety systems such as the FirePro aerosol generators required a consistent and high standard of competence. Without a national or internationally agreed standard, consistency of safe installation could not be assured for coded marine vessels. [2.9]
Ocean Engineering did not share its generic installation risk assessment and method statement with Stevenson’s engineering project manager. Stevenson did not hold safety discussions with Ocean Engineering’s installation technicians or request sight of its risk assessment or method statement. This, combined with Ocean Engineering not properly understanding the risks, meant an opportunity to ensure the engine room was evacuated before applying power to the system and connecting the aerosol generators was lost. [2.10]
Although Stevenson had a written policy and procedure for contractors working on its site, it did not have a robust formal process in place for the safety management and control of contractors working on its vessels. [2.10]
This accident has demonstrated the potentially fatal consequences of being in a protected space during a release of a FirePro system and the need for it to be treated in a similar manner to CO2 fire suppression systems during installation and servicing. [2.11] 3.2 OTHER SAFETY ISSUES NOT DIRECTLY CONTRIBUTING TO THE ACCIDENT Neither FirePro nor FirePro UK had procedures in place to scrutinise and approve its authorised installers’ design calculations and installation plans as FirePro and FirePro UK could not approve installations on marine vessels. [2.7.1] 3.3 SAFETY ISSUES NOT DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS The MCA’s MSIS 12 contained important information to aid its surveyors when inspecting condensed aerosol systems. However, the hazards listed in MSIS 12, including the generation of CO, were not listed in section 2 of the Certificate of Inspection and Tests. [2.8]
55 SECTION 4 – ACTION TAKEN 4.1 MAIB ACTIONS The MAIB has:
● Issued a safety bulletin (Annex E) that warned of the inadvertent discharge of a FirePro condensed aerosol system and included a recommendation (S2020/144) to FirePro UK to issue a safety alert to the owner/operators of vessels fitted with its systems and its network of marine installation/maintenance engineers, highlighting the circumstances of this accident and advising them of appropriate measures to take to reduce the risk of exposure to fire-extinguishing particles.
● Issued a safety flyer to the fishing industry (Annex F). 4.2 ACTIONS TAKEN BY OTHER ORGANISATIONS FirePro UK has:
● Issued a safety alert to the owner/operators of vessels fitted with its systems and its network of marine installation/maintenance engineers highlighting the circumstances of this accident and advising them of appropriate measures to take to reduce the risk of exposure to fire-extinguishing particles.
● Issued a safety bulletin to all marine distributors of the FirePro system highlighting the requirement to provide a safe system of work when installing the FirePro system. This is to include method statements, risk assessments and the requirements for working in confined spaces.
● Issued basic guidance information in the form of a quick start guide highlighting the requirements for designing, installing and commissioning of the system, including periodical inspection and testing. FirePro has:
● Undertaken qualitative and quantitative assessment of the by-products of FirePro aerosol generators in a total flooding application.
● Updated its Annex 2 Marine Manual for small vessels to include a more comprehensive description of the installation of FirePro systems, including maintenance and inspection.
● Issued a safety bulletin worldwide to all master distributors highlighting the dangers of exposure to the suppressant agent as it is discharged from the aerosol generator and the requirement to follow the FirePro installation information.
56 The Maritime and Coastguard Agency has:
● Issued two safety bulletins (SBI022 & SBI023) highlighting the hazards of unintentional activation of fixed aerosol fire suppression systems and the requirement to ensure the wiring system is in accordance with the manufacturer’s requirements.
● Included a statement in the current Certificate of Inspection and Test for FirePro that warns about CO generation: 9.7 Aerosol Fire Suppression systems may in certain circumstances carry the risk of producing potentially fatal quantities of Carbon Monoxide (CO) as the system activates and produces the aerosol. Sufficient care should be taken during installation and maintenance to ensure the risk of exposure is as low as reasonably practicable and deliberate activation must only occur when the space is confirmed to be evacuated. [sic]
● Published Marine Guidance Note (MGN) 659 (M+F) Amendment 1 The Merchant Shipping and Fishing Vessels (Entry into Enclosed Spaces) Regulations 2022. This MGN supports the interpretation of the underpinning regulations set out in The Merchant Shipping and Fishing Vessels (Entry into Enclosed Spaces) Regulations 2022 (Statutory Instrument 2022 number 96) which are applicable to UK vessels, including non-SOLAS vessels and fishing vessels.
57 SECTION 5 – RECOMMENDATIONS The Maritime and Coastguard Agency is recommended to: 2023/116 Take steps to improve the standard of installation of safety critical fire-extinguishing systems in vessels operating under codes of practice (i.e. non-SOLAS vessels) to ensure that, specifically:
●Vessel owners are aware of the obligation to notify the Maritime and Coastguard Agency in advance of the installation, in order to obtain pre-installation approval.
●Equipment installation is undertaken in accordance with manufacturers’ instructions and the relevant statutory requirements.
●In collaboration with industry stakeholders, introduce a competency standard for the installers of systems on vessels.
●The information provided in the Marine Survey Instructions for the Guidance of Surveyors for Fire Protection Arrangements (MSIS 12) and the Certificate of Inspections and Tests is consistent. FirePro is recommended to: 2023/117 Undertake a specific risk assessment for the installation and operation of each of its fire-extinguishing systems to identify and mitigate all of the associated hazards, including those identified as part of this investigation, to a level that is considered as low as reasonably practicable. 2023/118 Review its safety-related documentation for its fire-extinguishing systems (including, but not limited to, the installation and operational guidance and material safety data sheet) to:
●Incorporate the hazards identified as part of this investigation, specifically those associated with carbon monoxide generation and risk of inhalation injury, and the required control measures. W. Stevenson & Sons Limited is recommended to: 2023/119 Update its safety management system for vessels alongside, specifically to include the control and safe management of contractors, including the provision of rescue plans for people working on board. Safety recommendations shall in no case create a presumption of blame or liability
Marine Accident Report
FD06076 | 2023_英国_safety-warning-issued-about-the-hazards-of-flexible-hose-installations__2023-SB1_Finnmaste.pdf
分类:06_境外及港澳台调查报告 | 年份:2023 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
M A I B ' s l ogo SAFETY BULLETIN SAFETY BULLETIN SB1/2023 MARCH 2023 Potential fire hazards from flexible hose installations identified following a fire on board the roll-on/roll-off cargo ship Finnmaster in Hull, England on 19 September 2021 Extracts from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 Regulation 5: “The sole objective of a safety investigation into an accident under these Regulations shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of such an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” Regulation 16(1): “The Chief Inspector may at any time make recommendations as to how future accidents may be prevented.” Press Enquiries: +44 (0)1932 440015 Out of hours: +44 (0)300 7777878 Public Enquiries: +44 (0)300 330 3000 NOTE This bulletin is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2023 See http://www. nationalarchives.gov.uk/doc/ open-government-licence for details. All bulletins can be found on our website: https://www.gov.uk/maib For all enquiries: Email: maib@dft.gov.uk Tel: +44 (0)23 8039 5500 Finnmaster’s fire-damaged compartmentInterior section of ash-covered engine compartment with its ceiling peeling and hanging down in places.
MAIB SAFETY BULLETIN 1/2023 This document, containing safety lessons, has been produced for marine safety purposes only, on the basis of information available to date1. The Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 provide for the Chief Inspector of Marine Accidents to make recommendations at any time during the course of an investigation if, in his opinion, it is necessary or desirable to do so. The Marine Accident Investigation Branch is carrying out an investigation into the fire on board the roll-on/roll-off cargo ship Finnmaster in Hull, England, on 19 September 2021. The MAIB will publish a full report on completion of the investigation. Andrew Moll's signature Captain Andrew Moll OBE Chief Inspector of Marine Accidents NOTE This bulletin is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall not be admissible in any judicial proceedings whose purpose, or one of whose purposes, is to apportion liability or blame. This bulletin is also available on our website: www.gov.uk/maib Press Enquiries: 01932 440015 Out of hours: 0300 7777878 Public Enquiries: 0300 330 3000 1 A previous safety bulletin, issued by MAIB in March 2022, focused on separate safety issues arising from this accident: https://www.gov.uk/maib-reports/safety-warning-issued-after-discovery-of-blocked-fixed-co2-fire-extinquishing-system-pilot- hoses
1 BACKGROUND On 19 September 2021, a fire broke out in the auxiliary engine room on board the Finland registered roll-on/roll-off cargo ship Finnmaster while departing Hull, England. The fire was contained and subsequently extinguished without injury to the crew, but the equipment in the auxiliary engine room suffered serious damage (Figure 1). Finnmaster’s auxiliary engine room was equipped with two main alternators. These were driven by marine gas oil (MGO) fuelled engines and named as auxiliary engine 1 (AE1) and auxiliary engine 2 (AE2). Each auxiliary engine comprised 12 cylinders in a v-shaped configuration and was rated at 1100 kilowatts. A fuel supply pump supplied the MGO to both auxiliary engines. The fuel supply pipe was then routed to an inboard and outboard set of cartridge filters2 and a high-pressure fuel injection pump, which were mounted on either side of each engine (Figure 2). 2 A disposable filter insert contained within a housing. Figure 1: Damage sustained to auxiliary engine roomAsh and patches of smoke damage cover the auxiliary engine room equipment. For illustrative purposes only: not to scale Figure 2: Schematic diagram of auxiliary engine fuel supply system MGO service tank To auxiliary engine 1 Auxiliary engine 2 Remote closing valve Fuel suction filter Fuel supply pump Fuel pressure gauge Fuel pressure switch Flexible fuel hose assembly Alternator Flexible fuel hose assembly Fuel injection pump Fuel cartridge filter Turbochargers
2 INITIAL FINDINGS The MAIB investigation identified that the fire started below the outboard turbocharger of AE2 when a small-bore flexible fuel hose failed. Exhaust gas had leaked from the outlet of the turbocharger and caused the fuel hose to overheat and fail allowing MGO to spray onto a high temperature surface, where it ignited and a significant fire developed. Auxiliary engine alarm system modifications Maintenance records showed that the alarm system for both auxiliary engines had been modified between April 2003 and July 2006, when Finnmaster was under different ownership. Low pressure fuel alarm pressure switches and gauges had been installed to both AE1 and AE2 to alert the ship’s engineers should the fuel cartridge filters become blocked. The flexible fuel hose that failed in the accident was connected to the outlet from the inboard set of AE2 cartridge filters (Figure 3a); the hose was routed aft along the engine and passed over the top of the flywheel cover under the turbochargers (Figures 3b and 3c). It then connected to a pressure sensor on an instrument panel mounted outboard of the AE2 alternator. Both this hose and the matching hose on AE1 were 3.4m in length. No isolation valve was installed at the connection to the cartridge filters. The thermal insulation that covered the auxiliary engine turbochargers had also been modified by the installation of bespoke insulation pads over the existing insulated box structure. The flexible fuel hose from the AE2 inboard fuel cartridge filters was routed under these insulation pads. Regulation and guidance SOLAS Convention3 Chapter II-2: Construction – Fire protection, fire detection and fire extinction, permitted the restricted use of flexible hose assemblies in positions where the Administration is satisfied that they are necessary, and that, oil fuel lines shall not be located immediately above or near units of high temperature. The International Maritime Organization (IMO) provided guidance on compliance with SOLAS on the use of flexible hose assemblies through its Maritime Safety Committee (MSC). In June 1994, the committee issued circular MSC/Circ.647 – Guidelines to Minimize Leakages from Flammable Liquid Systems. This stated that flexible hose assemblies should be in as short lengths as practicable and only used where necessary to accommodate relative movement between fixed piping and machinery parts. In June 2009, the MSC consolidated the IMO’s guidance on fire safety into circular MSC.1/Circ.1321 – Guidelines for Measures to Prevent Fires in Engine- Rooms and Cargo Pump-Rooms. This circular stated that, in addition to the requirements of MSC/Circ.647, flexible hoses should not, in general, exceed 1.5m in length. It further advised that hoses should be constructed to a recognized standard and be approved as suitable for the intended service, taking into account fire resistance, pressure, temperature, fluid compatibility and mechanical loading including impulse where applicable. 3 The International Convention for the Safety of Life at Sea (SOLAS), 1974, as amended.
3 The IMO guidance on flexible hose installations, including the limitation of length, were incorporated into the rules of the two classification societies that provided oversight of Finnmaster during the period that the flexible hoses were in place on the vessel. Figure 3: Small-bore flexible fuel hose assembly on AE2, as indicated by dashed orange line Part of the fire-damaged auxiliary engine system, with a labelled dashed orange line to indicate the route of the failed flexible fuel hose pressure connection along to the two inboard AE2 cartridge filters. Another part of the fire-damaged auxiliary engine system, with a labelled dashed orange line indicating the flexible fuel hose assembly passing beneath the inboard AE2 turbocharger and its insulated pads. Further part of the fire-damaged auxiliary engine system, with a labelled dashed orange line indicating the flexible fuel hose assembly connection passing beneath the outboard turbocharger and its insulated pads before reaching the fuel pressure gauge and fuel pressure switch. Inboard turbocharger Inboard turbocharger insulation pads Outboard turbocharger Outboard turbocharger insulation pads Fuel pressure switch Fuel pressure gauge Fuel pressure connection to cartridge filter Flexible fuel hose assembly Flexible fuel hose assembly a b c
4 FINDINGS In this case, the flexible hose assemblies were not needed to accommodate relative movement between fixed piping and machinery parts over their entire length between the cartridge filters and the instrument panel. Furthermore, the routing of the hoses under the turbochargers covered by the insulation pads exposed them to the risk of contact with high temperatures and also made them difficult to inspect. SOLAS, IMO guidance, and classification society rules all provided the means to ensure that systems are designed, installed and maintained so as to reduce the risk of fires in machinery spaces. The MAIB investigation into the modifications to the auxiliary engine alarm system is ongoing, but has established that the initial proposal to modify the system on board Finnmaster had not been submitted to the classification society for approval and the installation was not surveyed on completion. Although the flexible fuel hose was subsequently replaced a number of times during the period of over 15 years before the accident, its material, length and routing had remained the same throughout. Furthermore, the risk that the flexible fuel hoses posed to the safety of the vessel had not been identified or mitigated. SAFETY LESSONS
● The risks associated with a modification on safety critical equipment should be considered before and during the work being completed. In this case, the positioning of the fuel pressure gauges and pressure switches required the pressure signal to be transferred from one side of the engine to the other. The relocation of the pressure switch closer to the cartridge filters would have removed the need for a long hose; if this was not possible, a rigid metal pipe secured with clamps and routed at an appropriate distance from the engine’s exhaust might have been a safer option.
● Flexible hoses are recognised as having a higher risk of failure than a properly fitted metal pipe. An isolation valve fitted at the point of supply allows a flexible hose to be safely isolated in the event of leakage.
● Flag state administrations, ship operators, classification societies, marine surveyors and port state control officers are advised of the risks posed by flexible hose assemblies used in systems that carry flammable liquids if they are not installed and maintained in accordance with IMO MSC.1/Circ.1321. Issued March 2023
FD06077 | 2024_英国_fall-from-height-on-bulk-carrier-equinox-seas-with-loss-of-1-life__2024-12-EquinoxSeas-Rep.pdf
分类:06_境外及港澳台调查报告 | 年份:2024 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
ACCIDENT REPORT ACCIDENT REPORT INVESTIGATED BY THE MAIB ON BEHALF OF THE CAYMAN ISLANDS GOVERNMENT Report on the investigation of a fall from height on the bulk carrier Equinox Seas resulting in one fatality at ONEX Syros Shipyard, Ermoupoli, Syros, Greece on 17 April 2023 VERY SERIOUS MARINE CASUALTY REPORT NO 12/2024 SEPTEMBER 2024
This investigation was carried out by the UK Marine Accident Investigation Branch (MAIB) on behalf of the Cayman Islands Government in accordance with the Memorandum of Understanding between the MAIB and the Red Ensign Group Category 1 registries of Isle of Man, Cayman Islands, Bermuda and Gibraltar. Extract from The Cayman Islands Merchant Shipping (Marine Casualty Reporting and Investigation) Regulations, 2018 – Regulation 4: “The sole objective of a marine safety investigation into an accident under these Regula- tions shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It is not the purpose of a marine safety investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 22 of The Cayman Islands Merchant Shipping (Marine Casualty Reporting and Investigation) Regulations, 2018, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes, is to attribute or apportion liability or blame. All MAIB publications can be found on our website: www.gov.uk/maib For all enquiries: Marine Accident Investigation Branch First Floor, Spring Place 105 Commercial Road Southampton SO15 1GH United Kingdom Email: maib@dft.gov.uk Telephone: +44 (0)23 8039 5500 Press enquiries during office hours: +44 (0)1932 440015 Press enquiries out of hours: +44 (0)300 7777878 Maritime Authority of the Cayman Islands Breezy Castle Unit 1 125 Owen Roberts Drive P.O. Box 2256 Grand Cayman KY1-1107 www.cishipping.com/contact-us © Crown copyright, 2024 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned.
CONTENTS GLOSSARY OF ABBREVIATIONS AND ACRONYMS SYNOPSIS 1 SECTION 1 – FACTUAL INFORMATION 2 1.1 Particulars of Equinox Seas 2 1.2 Background 3 1.3 Narrative 3 1.4 Environmental conditions 5 1.5 Equinox Seas 5 1.5.1 General 5 1.5.2 Crew 5 1.5.3 The fitter 5 1.5.4 Engine room ventilation system 6 1.5.5 Shipyard work 9 1.6 Equinox Maritime 14 1.6.1 General 14 1.6.2 Safety management system 14 1.7 ONEX Syros Shipyards S.A. 16 1.7.1 General 16 1.8 Regulation and guidance 16 1.8.1 Regulation in a shipyard environment – ships not in operation 16 1.8.2 Regulation in a shipyard environment – ships in operation 16 1.8.3 The Code of Safe Working Practices for Merchant Seafarers 18 1.8.4 Guidance on the management of safety in shipyards 19 1.8.5 Signage and barriers 21 1.9 Previous accidents 22 1.9.1 BW Havfrost – fall from height 22 1.9.2 Seatruck Pace – fall from height 22 SECTION 2 – ANALYSIS 23 2.1 Aim 23 2.2 Overview 23 2.3 Fatigue 23 2.4 The accident 23 2.4.1 Entry into the fan room 23 2.4.2 The fall 24 2.4.3 Cause of death 24 2.4.4 Emergency response 24 2.5 The ventilation fan removal 24 2.5.1 Specific risks 24 2.5.2 Barrier controls 25 2.6 Shipboard safety management 26 2.6.1 Shipyard environment 26 2.6.2 Management of safety on board Equinox Seas in the shipyard 26 2.6.3 Communication and coordination 26 2.6.4 Crew management 27
- 7 Guidance and regulation
27 2.7.1 Guidance to shipyards 27 2.7.2 The Code of Safe Working Practices for Merchant Seafarers 27 2.7.3 The Oil Companies International Marine Forum 28 2.7.4 Guidance to masters 28 SECTION 3 – CONCLUSIONS 29 3.1 Safety issues directly contributing to the accident that have been addressed or resulted in recommendations 29 3.2 Other safety issues directly contributing to the accident 29 3.3 Safety issues not directly contributing to the accident that have been addressed or resulted in recommendations 29 3.4 Other safety issues not directly contributing to the accident 29 SECTION 4 – ACTIONS TAKEN 30 4.1 Actions taken by other organisations 30 SECTION 5 – RECOMMENDATIONS 31 FIGURES Figure 1: Access to the starboard engine room ventilation fan room Figure 2: Equinox Seas general arrangement Figure 3: Starboard engine room ventilation duct arrangement Figure 4: Starboard engine room fan pedestal fire damper Figure 5: Starboard ventilation trunk internal structure, looking up from the access cover Figure 6: Disconnected fire damper actuator Figure 7: Painting work on the starboard fan room, showing the areas of red and pink primer paint applied by the deck crew Figure 8: Starboard engine room fan unit awaiting replacement on board Figure 9: Barrier tape across the fan room access Figure 10: Pallet on the fan pedestal in the position it was reported to have been found
GLOSSARY OF ABBREVIATIONS AND ACRONYMS °
degrees °C
degrees Celsius
3/O
third officer AIBN
Accident Investigation Board Norway C/E
chief engineer
C/O
International Convention for the Safety of Life at Sea, 1974 as amended UK
- United Kingdom
UTC
universal time coordinated VHF
very high frequency Equinox SeasStock image showing a side-on view of the port side of Equinox Seas while in port.
1 SYNOPSIS On 25 March 2023, the Cayman Islands registered bulk carrier Equinox Seas arrived at the ONEX Syros Shipyards S.A. facility on the island of Syros, approximately 50 nautical miles south-east of Athens, Greece for a period of scheduled maintenance. On 17 April 2023, a fitter on board Equinox Seas entered the fan room on the starboard side of the ship’s funnel, where an engine room fan had been removed. The fitter fell 10m down the open ventilation trunk to the engine room below. The fitter was recovered from the base of the ventilation trunk and moved to a local hospital, where he died from his injuries. The investigation concluded that:
●The fitter passed a tape barrier placed across the entrance to the fan room access by the shipyard, possibly due to a reduction in alertness due to the time of day the accident occurred.
●The response to the accident by all the organisations involved was both timely and effective.
●The management of safety on board Equinox Seas in a ship repair setting, and the coordination of activities, was poor.
●Guidance on the management of safety on board ships in a ship repair facility was either unavailable or not widely promulgated, and the responsibility for safety was poorly understood. Following the accident, the ship’s management company, Equinox Maritime Ltd, amended its safety management system to address risks arising in a shipyard environment. The Maritime and Coastguard Agency initiated a work item to consider amendments to the Code of Safe Working Practices for Merchant Seafarers to highlight the raised level of risk awareness required while a ship is undergoing repair. A recommendation has been made to ONEX Syros Shipyards S.A. to update its safety management system to ensure that risks created by the work carried out by its workers are effectively managed and coordinated with a ship’s crew and that the responsibility for safety is clearly understood between all parties.
2 SECTION 1 – FACTUAL INFORMATION 1.1 PARTICULARS OF EQUINOX SEAS SHIP PARTICULARS Vessel’s name Equinox Seas Flag Cayman Islands Classification society American Bureau of Shipping IMO number/fishing numbers 9229697 Type Bulk carrier Registered owner Equinox Seas Ltd Manager(s) Equinox Maritime Ltd Construction Steel Year of build 2003 Length overall 189.99m Registered length 182.61m Gross tonnage 30,049 Minimum safe manning 14 Authorised cargo Dry cargo in bulk VOYAGE PARTICULARS Port of departure Not applicable Port of arrival Not applicable Type of voyage Alongside at Ermoupoli, Syros, Greece Cargo information None Manning 26 MARINE CASUALTY INFORMATION Date and time 17 April 2023 at 1350 (UTC +3) Type of marine casualty or incident Very Serious Marine Casualty Location of incident Ermoupoli, Syros, Greece Place on board Engine room Injuries/fatalities 1 fatality Damage/environmental impact None Ship operation Undergoing maintenance Voyage segment Alongside External & internal environment Light airs, air temperature 20°C Persons on board 26 crew, plus shore workers
3 1.2 BACKGROUND On 24 March 2023, the Cayman Islands registered bulk carrier Equinox Seas arrived at the ONEX Syros Shipyards S.A. facility (the shipyard) on the island of Syros, Greece for scheduled maintenance. On 13 April 2023, after an initial period out of the water in one of the shipyard’s floating docks, the ship moved to the eastern berth within the shipyard’s perimeter for completion of the work being carried out on board. Although Equinox Seas was operating under its own power at the time of the accident, the shipyard work had not been completed. 1.3 NARRATIVE At about 0730 on 17 April 2023, Equinox Seas’ chief engineer (C/E) conducted a toolbox talk where the crew, including the two fitters, were instructed to clean and tidy the ship in preparation for departure from the shipyard. It was a public holiday in Greece and no on board work by the shipyard was planned for the day. At 1300, the two fitters1 from Equinox Seas’ crew met at the workshop on the aft mooring deck. After a period in the workshop they went to the fan room on the starboard side of the second deck to check the remaining shipyard work. The access into the fan room (Figure 1) was open. At about 1350, one fitter had turned away to make their way back to the workshop when they heard a scream behind them. Turning back to the fan room, the fitter’s colleague was not in sight. The fitter surmised that their colleague had fallen into the fan pedestal and down the ventilation trunk leading to the engine room. The fitter quickly made their way down to the main deck, where they met the bosun and relayed what had happened. The bosun used their handheld very high frequency (VHF) radio to raise the alarm, saying that the fitter had fallen down the fan. Equinox Seas’ master and C/E were in the ship’s conference room meeting the ship’s agent when they heard the bosun’s VHF call. They both made their way to the fan room. The VHF radio call from the bosun was also heard by the chief officer (C/O) who, in turn used their own VHF radio to call the third officer (3/O) and instruct them to sound the general emergency alarm. The 3/O went to the bridge and sounded the alarm before using the ship’s public address system to inform the crew of the location of the accident. A fire and safety watchman employed by the shipyard was on board Equinox Seas. When the general emergency alarm sounded, the watchman made a phone call to the shipyard’s main gatehouse to request emergency assistance. The security guards at the gatehouse then called the emergency services2 on the island. 1 A skilled member of the ship’s crew who completes mechanical maintenance on board. 2 Emergency medical support in Greece was provided by EKAB (Eθνικό Κέντρο Άμεσης Βοήθειας) the national medical emergency service.
4 Figure 1: Access to the starboard engine room ventilation fan room Close-up of a large metal casing mounted on a shallow plinth on the starboard side open deck at the base of the funnel. ‘Engine Room Air Vent’ is stencilled in red capital letters on the casing’s facing side. The large access door made up of narrow, flat, sloping pieces of metal is open and hinged at the forward end. Three strips of black and yellow hazard tape are secured horizontally across the opening into the space, from which the fan has been removed. Funnel Louvre access door in open position Starboard engine room ventilation fan room (fan removed) When the master and C/E arrived at the fan room no-one was visible, so they made their way down to the engine room. The C/E identified the access to the trunk leading from the fan room inside the entrance to the storeroom on the first platform deck. Listening at the access cover, they could hear the fallen fitter groaning inside. Crew members arrived at the scene in response to the announcement on the public address system and, with the assistance of a technician who was working on board, they started to unbolt the ventilation trunk access cover. The master returned to the conference room and asked the ship’s agent to contact the emergency services, then went back to the engine room. The agent called the main gatehouse with a second request for help, unaware of the earlier call made by the fire and safety watchman. At 1405, an ambulance from the nearby hospital arrived at the shipyard gate and was directed to the berth where Equinox Seas was moored.
5 By 1412, the access cover to the ventilation trunk had been removed and the crew could see the fallen fitter in the plenum chamber3 at the base of the ventilation trunk. He was in an inverted position with his head and shoulders in the entrance of one of the distribution ducts leading from the plenum chamber. He was conscious, though clearly seriously injured. Two crew from Equinox Seas entered the trunk and reassured the injured fitter. At 1416, the ambulance crew arrived at the entrance to the trunk, guided by three shipyard fire and safety watchmen. At 1425, the fitter was secured to a rigid stretcher and then extracted from the ventilation trunk through the access opening from where he was taken to Equinox Seas’ main deck and lifted off the ship by shore crane to the waiting ambulance. At 1434, the ambulance departed and transferred the fitter to Syros hospital where he received medical treatment. At 1847, the fitter was pronounced deceased. 1.4 ENVIRONMENTAL CONDITIONS The weather on 17 April 2023 was fine and clear with an air temperature of 20°C. The decks of Equinox Seas were dry. 1.5 EQUINOX SEAS 1.5.1 General Equinox Seas was a 30,049 gross tonnage geared bulk carrier built in 2003 and operated by Equinox Maritime Ltd (Equinox Maritime). It was registered in the Cayman Islands and was appropriately certified for operation. 1.5.2 Crew Equinox Seas’ crew hailed from four different nations and the on board working language was English. The composition and certification of the crew was in accordance with the requirements of the Cayman Islands. The master was in overall command of the ship while it was in operation. Maintenance of the ship was managed by the C/O and C/E. The deck crew, who completed general maintenance on deck and carried out watchkeeping operations, reported to the C/O via the bosun. The engine crew worked under the direction of the C/E on matters related to engineering, watchkeeping and maintenance. The two fitters on board were part of the engine crew but completed maintenance under the direction of either the C/E or C/O depending on the work to be done. The C/O was the ship’s safety officer. 1.5.3 The fitter Emmanuel Tayong was a 37-year-old Filipino national who was 1.57m tall. He had joined Equinox Seas in the shipyard on 2 April 2023 and had previously worked on Equinox Star. He was scheduled to work from 0800 to 1700, with an hour for lunch 3 A housing that contains air at positive pressure and evenly distributes it to outlet ducting.
6 taken between 1200 and 1300. In the days leading up to 17 April 2023, the records of rest showed that his working hours exceeded those in the published schedule and that he had worked routinely from 0700 to 1800 with an hour for lunch and two short breaks in the morning and afternoon. This working pattern did not breach Maritime Labour Convention (MLC)4 rest requirements. The shipyard work was completed daily between 0800 and 1700. Disturbance was minimal outside these hours, and through the night when the fitter was sleeping. At the time of the accident the fitter was wearing overalls over undergarments, safety shoes, and work gloves. His left shoe came off during the accident. He was not wearing a safety harness. The postmortem report, completed in Piraeus, Greece on 21 April 2023, indicated the cause of death as serious thorax, abdominal and pelvic lesions (reported fall from height). 1.5.4 Engine room ventilation system Equinox Seas had two engine room ventilation fans situated in separate fan rooms either side of the funnel casing on the second deck (Figure 2). Each fan was installed within a cowling that was fastened to a pedestal with an internal diameter of 1.20m and a height of 0.79m above the deck level. Within each pedestal was a fire damper that enabled the ventilation trunk to be closed off in the event of a fire. Figure 2: Equinox Seas general arrangement Image courtesy of Ria Maat (MarineTraffic.com)Stern to bow view of the starboard side of Equinox Seas at sea. A labelled arrow at the stern points to the position of the fan room, which is located on the deck on top of the lowest tier of the accommodation stack, to the right of the funnel and forward of the free-fall enclosed lifeboat davit system. Starboard engine room fan room The starboard fan pedestal sat at the top of a trunk leading vertically down to the engine room. The trunk was 10m long and was of rectangular cross-section, 1.67m wide and 1.60m deep (Figure 3). 4 The Maritime Labour Convention (MLC) was adopted as International Labour Organization (ILO) convention number 186 in 2006.
7 Figure 3: Starboard engine room ventilation duct arrangement Image courtesy of Brodosplit Profile plan diagram of the starboard aft quarter, showing the vertical arrangement of the ventilation trunking and corresponding colour-coded images of its key component parts. Fan room Fan pedestal Ventilation trunk interior looking up Ventilation trunk plenum Ventilation trunk access View from above the fan room access casing, showing its open door and the base of the funnel in the background. A round metal pedestal mounted inside the fan room access casing at the top of the ventilation trunking. The neck of the metal cowl is partially covered with a wooden pallet. View up towards the fan pedestal from inside the vertical trunking. A narrow access hatch in the bulkhead identified as the ventilation trunk access. A confined chamber beneath the ventilation trunk access. The starboard ventilation trunk fire damper comprised a steel disk pivoted along its central axis, offset by 45° to the centreline of the ship. The damper was designed to rotate by 90° between the open and closed positions. In the closed position, across the airflow, the damper rested against seats set into the pedestal. The aft inboard half of the flap rotated downwards to open the damper (Figure 4). An actuator was installed to allow the damper to be operated remotely.
8 Figure 4: Starboard engine room fan pedestal fire damper Close-up of the fan pedestal’s interior, showing a round metal disk tilted slightly so that its left-hand (forward) side is raised higher than its right-hand (aft) side. A highlighted area on the right-hand side of the disk identifies the position of the disconnected wiring for the fan motor. FORWARD AFT Fire damper (partially open) Disconnected wiring for fan motor At the base of the ventilation trunk at deckhead level on the second platform deck, a plenum chamber contained three distribution duct outlets that supplied ventilation to the engine room. Ventilation to the engine casing at main deck level and the first platform deck was provided by a series of scoops set into the vertical trunk leading to distribution ducts on those levels. The trunk was fitted with four stay bars of 50mm angle profile, two each at deck one and main deck levels. Internal rungs providing means to ascend the trunk for maintenance were installed up the forward outboard corner (Figure 5). Figure 5: Starboard ventilation trunk internal structure, looking up from the access cover Looking up towards the fan pedestal fire damper from inside the vertical trunking. Three curved structures mounted into the duct, one in the background, one bottom left and one top right, are labelled as air scoops. Three of the stay bars, one each on the right-hand side and left-hand side and in the background are shown. Three internal rungs are just visible above the left-hand stay bar. Fire damper Stay bars Air scoops Internal rungs
9 The fan rooms containing the two ventilation fans were of solid steel construction with louvres installed on the inboard and outboard sides. The outboard louvre assembly was hinged at the forward end, forming a louvred door. Three dogs were provided for securing it in position when closed. The lower sill of the louvre doorframe sat 0.90m above the outside deck level. 1.5.5 Shipyard work 1.5.5.1 General The specification for the work to be undertaken by the shipyard was drawn up in February 2023 by Equinox Seas’ technical superintendent in conjunction with the ship’s senior officers. Acting under delegated authority from the technical manager of Equinox Maritime, the technical superintendent directly managed the conduct of the ship repair activities. The work specification contained a number of general entries related to safety dictated by the shipyard, but none set by Equinox Maritime. The aspects of the work specification related to the individual work items did not contain detail of any safety provisions other than costings for any removals required for access and staging, if necessary. The general terms of the shipyard contract, appended to the work specification, indicated that the ship’s crew was allowed to carry out routine maintenance work only and that a list of work intended to be carried out was to be submitted to yard’s management upon arrival for approval [sic]. No such list of work was submitted to the shipyard. 1.5.5.2 Management of crew activities The ship’s crew remained under the control of the senior officers on board throughout the period Equinox Seas was in the shipyard. The master was relieved on 7 April 2023, part-way through the repair period, as a routine change of personnel. The outgoing master was Greek and the incoming master was Turkish. Equinox Maritime retained the outgoing master on board for the remaining period of the dry dock to support the technical superintendent. The outgoing master continued to exercise a degree of control over crew activities, including issuing instructions for cosmetic work being undertaken by the deck crew. Work planning meetings were routinely held at about 0900 each morning and on completion of each day’s work during the period Equinox Seas was in the shipyard. The meeting participants included the ship repair manager from the shipyard, the technical superintendent, and the ship’s senior officers. These meetings, held predominantly in the Greek language, did not follow a written agenda and were mainly related to the shipyard work being undertaken. No minutes were taken of the content of the meetings other than brief progress notes maintained by the technical superintendent. There was no evidence that safety considerations formed part of the discussions. Once the change of master had taken place, the outgoing master maintained a presence in the work planning meeting. The new master, the C/E and the C/O could not speak Greek and relied on a verbal account of the meeting contents provided by the superintendent and outgoing master.
10 1.5.5.3 Engine room ventilation fan work Among the planned work contained in the specification were two jobs related to the engine room ventilation fans: first, the fan and motor assemblies were to be removed to the shipyard workshop for overhaul and balancing; second, the fire dampers in the fan pedestals were to be inspected and renewed if necessary while the fan assemblies were ashore. The work on the port engine room fan was completed first. Once this fan had been reinstalled and tested, the starboard fan was removed for overhaul. The fan cowling assembly, including the fan and motor, was removed by staff from the shipyard and taken ashore. After the removal of the starboard engine room fan, the fire damper actuator at the base of the pedestal was disconnected (Figure 6) by Equinox Seas’ electrician. With the actuator removed, the damper was free to rotate. Figure 6: Disconnected fire damper actuator View of the base of the fan pedestal inside the fan room access casing with the location of the disconnected fire damper actuator highlighted. Close-up of the fire actuator connection and fire damper spindle. Fire damper spindle Fire actuator connection Fan pedestal The removal of the fans enabled access to the rear of the fan room and the ship’s deck crew were instructed by the C/O, under the direction of the outgoing master, to scale and paint the fan rooms. In the starboard fan room, the louvres of the fan room air inlets and the fan pedestal were scaled back to a good surface where corroded, and primer paint was applied (Figure 7). It was intended that the paintwork would be completed after the installation of the fan. The starboard fan overhaul (Figure 8) was completed before the shipyard ceased work for the public holiday and its reinstatement was planned for 18 April 2023.
11 Figure 7: Painting work on the starboard fan room, showing the areas of red and pink primer paint applied by the deck crew View towards the fan room casing, showing the louvre access doors in the foreground and background. Patches of red and pink on the inside of the doors and outer structure indicate the areas painted with primer. The neck of the fan pedestal is just visible behind the threshold of the access opening, which has been cordoned off with three strips of black and yellow hazard tape. Pink primer paint around the neck of the fan pedestal, which is partially covered with a wooden pallet. Figure 8: Starboard engine room fan unit awaiting replacement on board View towards a large round metal fan unit casing stowed on a wooden pallet.
12 1.5.5.4 Barrier control Once the starboard fan was removed, the shipyard placed black and yellow striped tape across the entrance to the fan room to restrict access to the space (Figure 9). No steps or staging were provided outside the fan room to provide a means of access. There was no additional signage applied to indicate the nature of any hazards in the space. Figure 9: Barrier tape across the fan room accessView towards the fan room casing, showing three strips of black and yellow hazard tape secured horizontally across the access opening to form a barrier. Barrier tape
13 A standard wooden pallet5 was placed on the top of the pedestal, partially covering the opening. The pallet was not secured and was reported to have been positioned across the forward half of the pedestal opening (Figure 10). The length of the pallet was 1.2m, the same as the internal diameter of the pedestal opening. Figure 10: Pallet on the fan pedestal in the position it was reported to have been found View of the pallet partially covering the fan pedestal access opening. The length of the pallet is labelled as 1.2m and each end rests on the internal rim around the top of the opening. Fan pedestal Pallet 1.2m 1.2m At the access to Equinox Seas from ashore, the shipyard signage indicated generic hazards and those specific to suspended loads and the presence of drops. The signs required safety helmets, boots, gloves, and overalls to be worn. When the deck crew undertook the painting work in the fan room, no permit for working at height was issued but, under the instruction of the C/O, they wore safety harnesses as fall protection. The deck crew passed beyond the black and yellow tape and used the pallet on top of the pedestal as a platform from which to work. The electrical supplies to both port and starboard fans came from a common starter panel on the main switchboard. It was not possible to isolate the fans individually at the switchboard and the only electrical isolation conducted was the opening of the local isolation switch in the fan room. No signage was posted on this switch, nor at the starter panel in the switchboard to indicate that the fan motor had been disconnected. 5 A standard European pallet weighed approximately 25kg and measured 0.8m in width, 1.2m in length and 0.15m in height.
14 The electrical safety procedures on board Equinox Seas indicated that electrical equipment should be disconnected before undertaking any work and restored on completion. No risk assessment or procedure was made available to the MAIB investigation detailing the shipyard’s requirements for electrical safety. 1.6 EQUINOX MARITIME 1.6.1 General Equinox Maritime was established in 2001 and provided technical ship management services in the dry bulk market from its offices in Athens. The company managed a total of 21 ships, including Equinox Seas. Equinox Maritime had a long-standing relationship with the shipyard and the technical management team was familiar with its capabilities and working practices. In the 3 years before the accident, Equinox Maritime had used the services of the shipyard 21 times. 1.6.2 Safety management system Equinox Maritime maintained a safety management system (SMS) in compliance with the requirements of the International Management Code for the Safe Operation of Ships and for Pollution Prevention (ISM Code)6. The SMS contained procedures for safety critical operations on board, including working aloft and overside, and a system for assessing the risk of work activities undertaken by the crew. The SMS had last been externally audited on 30 January 2023. This audit was completed by Lloyd’s Register on behalf of the flag Administration for the annual endorsement of the Document of Compliance (DOC)7 held by the company. The SMS required the completion of permits to work for certain tasks to verify that the safety requirements associated with the task were in place. The SMS procedure for safe working practices concerning the risks associated with falls from height8 stated that: Special preparations must be implemented for work in areas where personnel may be exposed to danger by falling down, including safety of personnel passing under such areas. [sic] To support this procedure, a work aloft/over side checklist was provided. The system that retained the electronic records of the permits issued on board Equinox Seas showed that permits to work were being routinely issued before the ship’s arrival at Syros, the most recent permit to work at height having been issued on 22 March 2023. No permits had been issued while Equinox Seas was in the shipyard. 6 The ISM Code was mandatory under chapter IX of the International Convention for the Safety of Life at Sea (SOLAS), 1974 as amended. 7 A DOC was issued to a company when the company aspects of the SMS were assessed as being compliant with the requirements of the ISM Code. It was valid for 5 years and subject to annual verification. 8 SMS reference: VOP-S-03, section 1.5
15 1.6.2.1 Crew induction The Equinox Maritime SMS required newly joined crew members to undergo a period of familiarisation. The induction process was overseen by the C/O and covered the basic safety and emergency requirements for crew members, including: explanation of the duties in accordance with the respective position description and safety methods in work and the prevention of accidents. [sic] The fitter’s familiarisation was recorded as having been completed on 3 April 2023. 1.6.2.2 Personal protective equipment The Equinox Maritime SMS contained a table that listed personal protective equipment (PPE) requirements while undertaking particular tasks. The table set out the PPE to be used by the crew when on ships in dry dock, which included:
● safety helmet
● safety shoes
● overalls/boilersuit
● leather gloves
● safety glasses The table noted the need for safety goggles and ear defenders as required for the activity being undertaken. 1.6.2.3 Safety management in the shipyard environment The SMS of Equinox Maritime did not include any procedures or risk assessments specific to a shipyard setting nor did it define the division of responsibilities for the management of safety while Equinox Seas was undergoing repair, except for the PPE requirements for use in a dry dock. There was no extraordinary health and safety meeting before Equinox Seas arrived at the shipyard for the repair period, nor were any routine safety inspections conducted by the crew during the period in the shipyard. The work being undertaken by the shipyard was managed between the ship repair manager and the technical superintendent. Equinox Maritime staff worked on the principle that the responsibility for safety while Equinox Seas was in the ship repair facility, including alongside the berth, resided with the shipyard. There was no agreement in place between Equinox Maritime and the shipyard that defined the responsibility for safety, other than the general terms of the contract between the two parties. Following the accident it was noted that personnel from the shipyard, the ship’s crew, and Equinox Maritime staff did not follow the PPE requirements of the ship’s SMS or shipyard signage.
16 1.7 ONEX SYROS SHIPYARDS S.A. 1.7.1 General ONEX Syros Shipyards S.A. provided shipbuilding and ship repair services to bulk carriers, oil tankers, military ships and commercial yachts. The shipyard’s engagement with the accident investigation was limited, and safety documentation covering the work on the engine room fans was not provided. As part of the contractual requirements between the shipyard and Equinox Maritime, the shipyard required the presence of a fire and safety watchman on board at all times. The shipyard did not provide the investigation with any information detailing the responsibilities of the fire and safety watchman. Following the accident the shipyard stated that the terms of the contract remained extant at the time of the accident, limiting the extent of work able to be carried out on board by the crew. In a public statement, the management made clear its belief that the incident took place outside and beyond the jurisdiction, operation and institutional texts governing the shipyard9. 1.8 REGULATION AND GUIDANCE 1.8.1 Regulation in a shipyard environment – ships not in operation While ships were in a floating dock in a shipyard, the local regulations on the health and safety of workers applied. The Greek regulations, among others, incorporated the framework contained in the European Union (EU) Council Directive 89/391/EEC on the introduction of measures to encourage improvements in the safety and health of workers at work10. The regulations set out, inter alia, a mandatory framework for the assessment and management of risks to workers. The directive required an employer to be in possession of an assessment of the risks to safety and health at work, including those facing groups of workers exposed to particular risks. The responsibility extended to the need to define the measures to be taken and, if necessary, the protective equipment to be used. 1.8.2 Regulation in a shipyard environment – ships in operation From the time Equinox Seas left the floating dock, it was a ship in service under the control of the master. The legislation of the flag Administration applied, with Greek legislation for foreign ships in a port in Greece overlapping these requirements11. 9 TradeWinds article: Filipino seafarer falls to his death on Equinox bulker in Greece; dated 21 April 2023, updated 24 April 2023 https://www.tradewindsnews.com/casualties/filipino-seafarer-falls-to-his-death-on- equinox-bulker-in-greece/2-1-1438658 10 Transposed into Greek legal framework by Presidential Decree 17/1996 – Measures to enhance the safety and health of workers during work in compliance with directives 89/391/EEC and 91/383/EEC. 11 Presidential Decree 1349/1981 – Regulation for the prevention of accidents on board ships.
17 While a ship was in a port in Greece, ships’ crews were not allowed to carry out work that was classified as repair or conversion12 but could carry out minor maintenance work, including: Cleaning of accommodation spaces, engine room, auxiliary machinery, storage areas excluding cargo spaces, as well as external areas of the ship; Rust removal and painting with hand tools in identified spots of limited extent; and Maintenance of parts of main and auxiliary systems. Such tasks were required to follow measures in line with the health and safety provisions for maritime labour applicable to foreign ships. These provisions included a requirement for the evaluation and mitigation of risk. 1.8.2.1 The International Management Code for the Safe Operation of Ships and for Pollution Prevention The SOLAS requirements for the management of risk stemmed from Chapter IX of the convention that implemented the ISM Code. This was reflected in Cayman Islands maritime legislation13. Section 1.2.2 of the ISM Code stated that the safety management objectives of the company should: Provide for safe practices in ship operation and a safe working environment; and Assess all identified risks to its ships, personnel and the environment and establish appropriate safeguards. The ISM Code also placed a responsibility on the company to ensure that applicable codes, guidelines and standards recommended by the organization, administrations, classification societies and maritime industry organizations are taken into account. [sic] 1.8.2.2 The Maritime Labour Convention While the ISM Code set out the structure for the safety management of a ship, the requirements of the ILO’s MLC standard 4.3 required the flag Administration to adopt laws for: The…effective implementation and promotion of occupational safety and health policies and programmes…including risk evaluation as well as training and instruction of seafarers; and reasonable precautions to prevent occupational accidents, injuries and diseases on board ship. In implementing these requirements, the Cayman Islands passed the Merchant Shipping (Maritime Labour Convention) (Health and Safety) Regulations, 2014. These regulations, applicable to Cayman Islands ships, wherever they may be, 12 Joint Ministerial Decision (Government Gazette B’ 3831/2017). 13 Cayman Islands Merchant Shipping Act (2021 Revision) – Section 183(4).
18 placed responsibilities on the shipowner14 to ensure that seafarers lived, worked and trained on board in a safe and hygienic environment. In so doing, the regulations required the shipowner and master to take into account the guidance contained in the Code of Safe Working Practices15, referencing the code produced by the UK Maritime and Coastguard Agency. Its carriage was a mandatory requirement for ships registered in the Cayman Islands. The regulations also required anyone working on board who was not the operator of the ship to inform them of any risks to health and safety arising out of the work they were carrying out on board. 1.8.3 The Code of Safe Working Practices for Merchant Seafarers The Code of Safe Working Practices for Merchant Seafarers (COSWP) was carried on board Equinox Seas. The COSWP provided guidance on a wide range of activities and ship operations and the management of risk on board, including that:
●Anyone working in a location where there is a risk of falling may be regarded as working at height, noting that Work at height should be subject to risk assessment, and suitable control measures should be taken to protect those who may be put at risk.
●Stages and staging that are not suspended should always be secured against movement. The COSWP further guided that a lock-out, tag-out (LOTO) procedure16 should be in place when working on machinery and power systems and that safety signs should be used, displayed and understood. The COSWP noted that there could be circumstances where the fittings of the ship may not be within the control of the ship, in which case it imposed a duty on the company to: ensure that safety signs are displayed where appropriate. If the Company is not in a position to provide signs (e.g. where the fittings of the ship are not within their control), they should ensure that signs are in place before allowing any relevant work to take place. The Company should also ensure that the system of signs in use is clearly understood. [sic] The COSWP stated that Yellow signs are advisory and mean be careful or take precautions. Such warning signs were based on a yellow triangle with a black border, with the symbol for the specific hazard shown in black. 14 As identified on the Maritime Labour Certificate or, if different, any other organisation or person that has assumed responsibility for the operation of the ship from the owner. The shipowner of Equinox Seas, according to the MLC definition, was Equinox Maritime Ltd. 15 At the time of the accident the Code of Safe Working Practices for Merchant Seafarers 2015 edition – Amendment 7, October 2022 was extant. 16 A safety procedure that required energy sources to be isolated and rendered inoperative with a lock and tag, preventing its operation and identifying the responsible worker, before starting work on the equipment (COSWP Chapter 20, section 20.13).
19 1.8.4 Guidance on the management of safety in shipyards 1.8.4.1 International Labour Organization In 1973 the ILO adopted the code of practice on Safety and health in shipbuilding and ship repair. The revised code of practice was adopted in 201817 to account for technological and other developments in the industry. The code was not legally binding but specified the principles and processes that could be implemented to promote decent work in particular workplaces or contexts and captured good industry practice. The code outlined the responsibilities, duties and rights of shipowners, employers, workers, and all other parties involved in workplace hazards and to improve the management of risks. It was applicable to all ship repair facilities. The code set out requirements for cooperation between all parties involved in a ship repair activity and that shipowners should include occupational safety and health criteria in procedures for evaluating and selecting ship repair facilities. The code included a requirement to provide all necessary information as is available and required for the evaluation of any hazards or risks to safety and health that might result from a particular hazardous factor. For any identified hazard the code highlighted the requirement contained across the health and safety regulations to take all reasonable, practicable and feasible measures to eliminate or, if this is not possible, control risks to safety and health identified in a risk assessment, in order to reduce exposure. Section 7.12 of the code dealt specifically with precautions against falls, highlighting the need for the shipyard to define barricading requirements where there is a risk of falling over an unprotected edge and barricading or protective covers where there is a risk of falling through an opening. The code noted that: where elimination of the fall risk is not possible, there should be a process to reduce the risk of falling by using fall-prevention measures that include: a) fixed and temporary work platforms, access ways, barriers, and so forth, including scaffolding, mobile work platforms, among other things; and b) fall restraint, which should only be used when elimination of the fall risk, the use of work platforms or hard barricading cannot be used. Fall restraint should prevent a person reaching a position at which there is a risk of a fall. Further, the code stated that: wherever practical, a safe working area should be provided by means of work platforms or scaffolds that have complete floors, guardrails, toe-boards, and safe access and egress. 17 Safety and health in shipbuilding and ship repair (Revised edition), published 19 February 2019.
20 Only where fall prevention strategies could not be used, did the code indicate the use of fall protection or fall arrest systems. The code included guidance on electrical safety, setting out a LOTO requirement that: Electrically powered equipment should be de-energized before mechanical work is done on such equipment. Power switches should be locked out or, where not possible, other measures taken to prevent the equipment from being energized without the knowledge of the persons working on it. Suitable warning notices should be posted at the power switch and signed by the persons who are to do the work. Such locks, notices or preventive devices should be removed only by the persons who installed them or by authorized persons.[sic] Section 8.3 of the code identified both work at height and electrical work as being high-risk and provided guidance on the implementation of a permit to work system to inform people of the hazards associated with the high-risk work and the precautions they have to take. 1.8.4.2 Oil Companies’ International Marine Forum guidance In 2003, the Oil Companies International Marine Forum (OCIMF)18 produced guidance on the Health, Safety and Environment at New-building and Repair Shipyards and During Factory Acceptance Testing. The OCIMF guidance noted that, while in a ship repair facility, the safety of the ship and the people on board it was generally dependent on the shipyard’s SMS. The guidance recognised that a ship might take on an unfamiliar status during a repair period and, consequently, both the ship and the people on board it could be exposed to unexpected and unfamiliar risks and hazards. The OCIMF guidance advised that a shipyard should develop an interface document or management plan to clearly identify how the SMS of the ship and shipyard would interlink during the repair period, detailing key roles and responsibilities, communications, and procedures. The guidance provided a framework for safety procedures, including:
● the use of PPE;
● periodic safety and progress meetings;
● safety inspections; and
● lines of communication. The OCIMF guidance further noted that: Shipbuilding or repair activity invariably results in the ship’s structure being incomplete, thus there are likely to be a large number of openings through which a person might fall. This includes shipside rails or rails in the engine room, missing blocks, access holes cut to facilitate work, removal of gratings and ladders, lightening holes in the structure and corroded areas. Company personnel should be particularly alert to the fact that, despite precautions being taken, unexpected hazards may still arise. 18 A voluntary association of oil companies with an interest in the shipment and terminalling of crude oil, oil products, petrochemicals and gas.
21 This was supported by a housekeeping checklist in an appendix to the guidance that stated, openings in decks, platforms and other structures are to be properly and adequately indicated and fenced (including corroded areas that will no longer support any weight). 1.8.4.3 Protection and Indemnity Club Guidance Equinox Maritime was a member of Gard Protection and Indemnity (Bermuda) Ltd. (Gard P&I club)19, which produced a range of guidance to support the safe operation of ships. Part of the Gard P&I club guidance to masters20 concerned a ship’s stay in shipyard or dry-dock and stated: When the vessel is to stay in a shipyard or a dry-dock, the Master and his/her officers should maintain the same safety and security standards as if in port. The Master and his/her officers should request that the same level, if not increased, safety precautions and safe working practices should be strictly applied by the dockyard workers to prevent not only personal injuries but also damage to the vessel itself, such as a fire or stability accidents. Close co-operation between the vessel’s deck and engine officers and the shipyard engineers is required. 1.8.5 Signage and barriers The signage requirements applicable to the ONEX Syros shipyard were set out in EU Council Directive 92/58/EEC21, a daughter directive to the framework Directive 89/391/EEC, and reflected in Greek law22. The directive set out the minimum requirements for the provision of safety and/or health signs at work. Annex V to the directive indicated a minimum requirement for the marking of obstacles and dangerous locations, including: Places where there is a risk of colliding with obstacles, of falling or of objects falling should be marked with alternating yellow and black, or red and white stripes in built-up zones in the undertaking to which workers have access during their work. As listed in the directive, the colours black and yellow in combination provided a warning indication. The directive permitted the use of a safety colour or a signboard to mark places where there was an obstacle or a drop. Section 9 of the COSWP, providing guidance on safety signs and their usage, did not specifically identify black and yellow striped tape as a hazard indicator but did reference Marine Guidance Note (MGN) 556 (M+F)23. The contents of MGN 556 (M+F) did not wholly match those in EU Council Directive 92/58EEC. Annex V of the MGN identified black and yellow markings only as indicating obstacles or dangerous locations where there is a risk of colliding with obstacles, or of objects falling. 19 A Protection and Indemnity (P&I) Club was a mutual insurance association that provided risk pooling, information and representation for its members. 20 https://gard.no/rules-statutes-and-guidances/#Guidances 21 Council Directive No. 58, dated 24 June 1992, on the minimum requirements for the provision of safety and/or health signs at work (Ninth individual directive within the meaning of Article 16 (1) of directive 89/391/EEC). 22 EUR-Lex document number 31992L0058 https://eur-lex.europa.eu/legal-content/EN/ NIM/?uri=CELEX%3A31992L0058 23 MGN 556 (M+F) Amendment 1 – The Merchant Shipping and Fishing Vessels (Safety Signs and Signals) Regulations 2001.
22 1.9 PREVIOUS ACCIDENTS Accidents that happen on board ships while in operation may be investigated under the responsibility of a flag Administration to investigate casualties occurring on its ships. Where a ship is not in operation, the maritime obligations may not be extant, and accidents that happen in a shipyard may not have been reported to, or have been subject to, an investigation by a flag state. 1.9.1 BW Havfrost – fall from height On 9 June 2014, a seaman died when he fell through an unguarded hatch into a cargo tank on board the Norwegian registered ship BW Havfrost while the ship was moored beside a quay in a shipyard awaiting docking. The accident was investigated by the Accident Investigation Board Norway (AIBN)24. The accident report (Marine report 2016/0825) noted that the cargo tank had been prepared for entry and an entry permit issued by the shipyard. The permit indicated that safety measures had been implemented; however, the investigation identified that these measures had not been put in place and that their absence was a contributory factor in the accident. The investigation was unable to determine the reason for the movement of the casualty immediately before his fall through an unguarded hatch. The investigation identified that the shipping company’s SMS considered the relevant shipyard’s safety requirements as applicable during dry-docking, but that a yard stay did not alter the ship master’s responsibility for safety. 1.9.2 Seatruck Pace – fall from height On 17 December 2018, the assistant bosun on board the freight ferry Seatruck Pace fell through an open ramp hatch after crossing a temporary rope barrier onto a narrow section of deck between the ship’s side and the hatch. The investigation (MAIB report 9/201926) found that the task allocated to the assistant bosun did not require him to access the unprotected deck edge beyond the barrier and it is unknown why he entered the hazardous area. The actions taken by the company in response to the accident included:
● Reminding its masters of the dangers of bypassing safety control measures and prompting them to review the safety of deck openings;
● Providing safety chains, fittings and warning signs for use on the temporary barriers; and
● Reviewing its risk assessment and permits to work concerning working at height. 24 The AIBN became the Norwegian Safety Investigation Authority in July 2020. 25 https://www.nsia.no/Marine/Published-reports/2016-08-eng 26 https://www.gov.uk/maib-reports/fall-from-height-on-ro-ro-freight-vessel-seatruck-pace-with-loss-of-1-life
23 SECTION 2 – ANALYSIS 2.1 AIM The purpose of the analysis is to determine the contributory causes and circumstances of the accident as a basis for making recommendations to prevent similar accidents occurring in the future. 2.2 OVERVIEW The fitter was fatally injured when he fell approximately 10m down the ventilation trunk leading from the starboard engine room fan to the plenum chamber at its base. To access the fan room the fitter passed hazard warning tape that shipyard staff had placed over the entrance to the fan room following removal of the fan for maintenance. This section of the report will consider the circumstances of the accident, the measures put in place to prevent it occurring, including the regulatory framework and available guidance, and the response to the accident. 2.3 FATIGUE The fitter had been on board Equinox Seas for 15 days since travelling to Greece from the Philippines and was working to a schedule that provided adequate periods of rest. The accident occurred during the early afternoon dip in alertness experienced as a natural consequence of circadian rhythm27. It is therefore unlikely that the fitter was fatigued due to a lack of effective rest, but it is possible that a reduction in alertness due to the time of day contributed to the decision to enter the fan room. 2.4 THE ACCIDENT 2.4.1 Entry into the fan room There was no discussion about the ongoing work in the fan room between the fitters on board Equinox Seas before the accident, and no jobs associated with the engine room fans were allocated to them. The reasoning behind the fitter entering a space that had no relation to any assigned work is speculative, and the decision made by the fitter to make the entry could not be determined. To have fallen into the fan pedestal the fitter passed beyond the tape placed by shipyard personnel over the opening to the fan room following the removal of the fan. The height of the louvre door sill and the lack of a means of access to the fan room made it likely that the fitter entered the fan room either by making his way head-first through the tape barrier, or by stepping over the barrier after climbing up onto the sill. Had the fitter accessed the deck in the fan room adjacent to the fan pedestal, its height, and the depth of the pedestal flange would have made it unlikely, though not impossible, for him to overbalance and fall into the pedestal from a standing position. It was not possible to determine which way the fitter entered the fan room. 27 The circadian rhythm is a 24-hour cycle responsible for regulating periods of wakefulness throughout each day. The rhythm naturally dips and rises to align an individual’s alertness to environmental cues, with a low in the early hours of the morning and a lesser dip in the early afternoon.
24 2.4.2 The fall The dimensions of the pallet that had been placed over the fan pedestal meant that it would not provide a stable working platform unless centrally positioned such that all four corners of the pallet rested on the pedestal flange. Without being secured in position, the application of a transverse force on the pallet would almost certainly have moved it into a position where one corner of the pallet would come off the pedestal flange, allowing the pallet to tip. When entering the fan room the fitter would likely have placed his weight on the pallet with a lateral force that moved a corner of the pallet off the pedestal flange, causing the pallet to rotate and the fitter to fall into the fan pedestal and onto the fire damper below. With the fire damper actuator removed, the damper disk was free to rotate. The arrangement of the damper against its sealing faces meant that weight acting on the aft inboard half of the damper disk would act to open the damper, allowing the fitter to fall into the trunk below. 2.4.3 Cause of death The fitter died as a result of the serious injuries sustained during the 10m fall down the ventilation trunk to the plenum chamber at its base. The dimensions of the trunk were sufficient to allow the fitter to rotate during the fall. His orientation at entry to the fan pedestal cannot be determined from the position he was in when found. At the time of the accident the fitter was not wearing the safety helmet required by the Equinox Maritime SMS and the shipyard gangway safety signage. Given the nature of the fitter’s injuries it is very unlikely that the omission of this PPE would have affected the outcome of the accident. 2.4.4 Emergency response The alarm was raised almost immediately after the accident. The rapid determination of the location of the fitter, the summoning of the emergency services, and the extraction of the fitter from the plenum chamber allowed the fitter to be quickly placed into the care of the medical services. The proximity of the hospital to the shipyard influenced the prompt response from shore-based emergency services. The response from Equinox Seas’ crew and the shipyard’s fire and safety watchmen was immediate and effective in both identifying the nature and location of the accident and quickly summoning shore assistance. The speed of the response to the accident from all the organisations involved was commendable. 2.5 THE VENTILATION FAN REMOVAL 2.5.1 Specific risks When the starboard fan was removed from the fan room the uncovered fan pedestal created a fall from height risk. The length of the open trunk was not visible to the casual observer when the pedestal fire damper was in the closed position, so it is likely the fitter was unaware of the substantial risk of falling further than the visible
25 short distance to the fire damper at the base of the fan pedestal. The deck crew wore safety harnesses when painting in the fan room. It was unclear whether this was in recognition of the risk of a fall down the trunk, or to mitigate falling from the fan pedestal to deck level; however, the lack of a safety harness indicated that the fitter might not have recognised the risk of falling that existed in the space when he entered it. The fan’s electrical isolation was achieved by opening the circuit breaker in the fan room. In the absence of signage at the switchboard or the fan room, and without the implementation of any LOTO procedure, the safety of the electrical isolation was wholly reliant on the knowledge and familiarity of personnel who might have operated the equipment. There was a risk of electric shock. Neither the shipyard nor the ship’s crew had carried out any risk assessment associated with the work to remove the engine room ventilation fans for overhaul. Consequently, the hazard of falling into the ventilation trunk was not identified or mitigated and exposed the crew to an unacceptable risk of harm. 2.5.2 Barrier controls The purpose of a barrier is to separate a person from a hazard. The shipyard workers had placed the black and yellow tape across the access to the starboard engine room fan room with the expectation that it would deter access. The use of such tape to warn of a hazard followed the EU directive requirements and national law; however, it did not specify the nature of the hazard it was indicating. By reference to MGN 556 (M+F), the COSWP identified that the use of black and yellow markings could be interpreted as warning of a dangerous location but did not necessarily identify the presence of a fall or electrical hazard. It is possible that the fitter might have taken the tape as denoting only the presence of the wet paint evident in the space. Without additional signage to indicate the nature of the hazards present in the fan room, the tape alone was insufficient as a control to prevent the space being accessed. The use of an unsecured pallet from which to work when painting the fan room did not meet the guidance contained in either the COSWP or the ILO code of practice for the provision of a safe working area. Further, it did not provide an effective barrier to falling into the ventilation trunk. The accident on board Seatruck Pace provided an example of where a limited temporary barrier without signage as to the hazard it was managing did not deter a crew member from passing through into an area containing a drop hazard. It demonstrated the need for an effective barrier between workers and a hazard. Similarly, on Equinox Seas the barrier controls in place in the fan room were insufficient to mitigate the risk of falling from height.
26 2.6 SHIPBOARD SAFETY MANAGEMENT 2.6.1 Shipyard environment It is likely that a shipyard period will require crew and shipyard workers to undertake tasks not necessarily carried out during normal ship operation. The increased on board workforce and the diversity of the work carried out will create additional hazards on board and heightened vigilance towards safety and the management of hazards will be required. 2.6.2 Management of safety on board Equinox Seas in the shipyard When Equinox Seas was in the floating dock it was a workplace within the shipyard and fell under the local health and safety regulatory framework, which required the employer to assess and manage the risks present. The contract between the shipyard and Equinox Maritime specified limitations of crew activities on board and a requirement for fire and safety watchman to be present. It did not specify how responsibility for the safety of crew was to be managed. Little information was provided to the investigation by the shipyard detailing how risks were assessed or how any identified risks were intended to be managed and coordinated with the crews of any ships using the shipyard. By not positively identifying the reason for placing the tape over the entrance to the fan room and identifying the risks in the space to the ship’s management, the shipyard was not meeting its safety obligations to cooperate and coordinate its actions in matters of the protection and prevention of occupational risks. This is similar to the BW Havfrost accident where the safety of crew members was reliant on the actions and procedures of the shipyard, which proved to be inadequate. It was evident that the ship’s SMS was effective before Equinox Seas’ arrival at the shipyard. Since there was a widely held perception on board Equinox Seas that the responsibility for safety lay with the shipyard while the ship was in the shipyard facility, it is possible that this was the reason Equinox Maritime did not impose the requirements of the SMS for managing safety on board as the ship returned to normal operation. Further, Equinox Maritime managers were familiar with the shipyard’s mode of operation having routinely used the facility before the docking of Equinox Seas. It is possible that the approach to safety in the shipyard environment had become normal to the Equinox Maritime managers. It is apparent that safety on board Equinox Seas was not effectively managed during the entire stay at the shipyard facility. 2.6.3 Communication and coordination There was no specific agreement on the management of safety between Equinox Maritime and the shipyard before Equinox Seas’ arrival at the shipyard. During the period Equinox Seas was in the shipyard coordination of the work activities was carried out at the daily work planning meetings between the shipyard’s repair manager and the senior Equinox Maritime staff on board. The meetings were conducted predominantly in Greek, taking advantage of the common language between the shipyard, the Equinox Maritime superintendent and the master who was on board when Equinox Seas arrived at the shipyard. It is likely the effectiveness of the meetings reduced because the incoming master could not speak Greek.
27 The work meetings provided the opportunity to liaise on matters of safety. However, with neither a written agenda nor representative from the shipyard safety department, the meetings focused solely on the technical progress of the work being completed. It is therefore unsurprising that safety lapses were not rectified by either the ship or the shipyard. It is evident that ineffective communication and coordination between the shipyard and ship’s staff meant that deficiencies in the management of safety on board Equinox Seas were not addressed. 2.6.4 Crew management The outgoing master issued some instructions directly to the ship’s crew without recourse to the lines of responsibility contained in the SMS. The painting of the engine room fan rooms was one such instruction. The reason for the fitter’s visit to the fan room just before the accident was not known to the senior officers who ultimately held responsibility for his conduct. It is possible the outgoing master’s presence and input into the management of the crew on board Equinox Seas created a disparate management chain. This lack of clarity in the management of the work being undertaken was possibly exacerbated by the predominant use of the Greek language in the work planning meetings. It is possible that the fragmented organisation on board contributed to the suboptimal management of safety while Equinox Seas was at the shipyard. 2.7 GUIDANCE AND REGULATION 2.7.1 Guidance to shipyards The guidance on safety in a shipyard environment contained in the ILO code of practice on Safety and health in shipbuilding and ship repair provided a framework for safe operations on board ships undergoing repair. Though focused on the operation of the shipyard, it provided specific guidance on the management of safety in a shipyard environment relevant to Equinox Seas. As a sectoral code, it was neither mandatory nor widely known within the shipping industry. Its use within the shipyard as a reference document could not be determined. The observed arrangements for the management of safety in the shipyard were not aligned with the guidance provided in the ILO code of practice and likely led to the disparate organisation of the management of safety. 2.7.2 The Code of Safe Working Practices for Merchant Seafarers The COSWP was a widely available and familiar document used by seafarers to access guidance on safe working practices on board a ship. The code provided detailed guidance on the identification of hazards and the management of risks. While the guidance in the ILO code of practice recognised the need for specific guidance in a shipyard, the COSWP did not address either the specific hazards ship repair activities create or amplify, or the need for the establishment of responsibilities, duties and rights for all parties involved in ship repair.
28 2.7.3 The Oil Companies International Marine Forum The guidance provided by OCIMF on Health, Safety and Environment at New-building and Repair Shipyards and During Factory Acceptance Testing set out practical measures for the coordination of activities between the shipyard and ship, including a formal definition of the safety responsibilities between the two parties. The guidance recognised that activities in shipyards could involve widespread alterations to the structure of a ship and highlighted the need for openings to be adequately indicated and fenced, and for effective permit to work systems to be in operation. As the shipyard had undertaken work on oil tankers it is likely that it had experience of working to the guidance produced by OCIMF but it was not possible to confirm this during the investigation. The OCIMF guidance related to the tanker operator market. It is reasonable that Equinox Maritime, as a company operating solely in the dry bulk market, would be unaware of the document. 2.7.4 Guidance to masters The guidance provided to masters by Gard P&I club was limited in respect of operations in a ship repair facility, but did highlight the need for close cooperation and coordination between the ship’s crew and the shipyard. The guidance was relevant and available but, with no mandatory carriage requirement unless an individual were to seek it out, neither the managers of Equinox Maritime nor masters on board Equinox Seas would be readily aware of its content.
29 SECTION 3 – CONCLUSIONS 3.1 SAFETY ISSUES DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS
The barrier controls in place in the fan room were insufficient to mitigate the risk of falling from height, resulting in the fitter sustaining fatal injuries when he fell approximately 10m down the ventilation trunk. [2.4.3, 2.5.2]
The specific risks associated with the fan removal were not assessed and so put staff at risk from those hazards present in the fan room. [2.5.1]
The intensity and diversity of shipyard work can create a wide range of hazards, and an enhanced awareness of safety is required to mitigate risk. [2.6.1]
It is apparent that safety on board Equinox Seas was not effectively managed during the entire stay at the shipyard facility. [2.6.2]
Ineffective communication and coordination between the shipyard and ship’s staff meant that deficiencies in the management of safety on board Equinox Seas were not addressed. [2.6.3]
The fragmented organisation on board contributed to the suboptimal management of safety while Equinox Seas was at the shipyard. [2.6.4]
Relevant industry guidance on the management of safety in a shipyard environment was not incorporated into the working practices of the shipyard. [2.7.1, 2.7.3]
The availability of relevant shipyard safety guidance from the P&I Club of which Equinox Maritime was a member was limited on board Equinox Seas. [2.7.4] 3.2 OTHER SAFETY ISSUES DIRECTLY CONTRIBUTING TO THE ACCIDENT The accident occurred during the afternoon dip in alertness experienced as a natural consequence of circadian rhythm. [2.3] 3.3 SAFETY ISSUES NOT DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS The Code of Safe Working Practices for Merchant Seafarers did not contain any guidance related to the risks created or amplified on ships in a shipyard environment. [2.7.2] 3.4 OTHER SAFETY ISSUES NOT DIRECTLY CONTRIBUTING TO THE ACCIDENT
The fan’s electrical isolation did not mitigate the risk of electric shock. [2.5.1]
Although unlikely to have affected the outcome, the fitter was not wearing the personal protective equipment required by the safety management system of Equinox Maritime at the time of the accident. [2.4.3]
30 SECTION 4 – ACTIONS TAKEN 4.1 ACTIONS TAKEN BY OTHER ORGANISATIONS The Maritime and Coastguard Agency has initiated a work item to consider the development of guidance to highlight the hazards specific to, and those amplified by, ships undergoing maintenance in ship repair facilities. This guidance is to be considered for inclusion in future amendments to the Code of Safe Working Practice for Merchant Seafarers. Equinox Maritime Ltd has updated its SMS to incorporate:
● A shipyard safety checklist detailing matters related to the safety provisions and the means of communication and coordination with the shipyard.
● Crew safety training before entering a shipyard to specifically raise awareness of the hazards encountered during a maintenance period in a ship repair facility.
● Requirements for safety meetings before, and during, dry dock periods.
● The inclusion of safety matters in the daily work planning meetings between the ship’s management and the shipyard, and the need to minute such meetings.
31 SECTION 5 – RECOMMENDATIONS ONEX Syros Shipyards S.A. is recommended to: 2024/133 Update its safety management and communication procedures to ensure that risks created by the work carried out in its shipyards are effectively managed and coordinated with the relevant ship’s crew and that the delineation of responsibility for safety on board is clearly understood between all parties. Safety recommendations shall in no case create a presumption of blame or liability.
Marine Accident Report
FD06078 | 2024_英国_man-overboard-from-potting-vessel-pioneer-with-loss-of-1-life__2024-19-Pioneer.pdf
分类:06_境外及港澳台调查报告 | 年份:2024 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
ACCIDENT REPORT ACCIDENT REPORT Report on the investigation of the fatal man overboard from the potting vessel Pioneer (NN200) south of Hastings, England on 29 July 2021 VERY SERIOUS MARINE CASUALTY REPORT NO 19/2024 DECEMBER 2024
The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2024 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. All MAIB publications can be found on our website: www.gov.uk/maib For all enquiries: Marine Accident Investigation Branch First Floor, Spring Place 105 Commercial Road Southampton SO15 1GH United Kingdom Email: maib@dft.gov.uk Telephone: +44 (0)23 8039 5500 Press enquiries during office hours: +44 (0)1932 440015 Press enquiries out of hours: +44 (0)300 7777878
CONTENTS GLOSSARY OF ABBREVIATIONS AND ACRONYMS SYNOPSIS 1 SECTION 1 – FACTUAL INFORMATION 2 1.1 Particulars of Pioneer and accident 2 1.2 Narrative 3 1.2.1 The accident 3 1.2.2 Emergency response 4 1.2.3 Environmental conditions 5 1.3 The crew 5 1.3.1 Skipper 5 1.3.2 Postmortem 5 1.3.3 Deckhand 5 1.4 Pioneer 6 1.4.1 General 6 1.4.2 Operation 9 1.4.3 Post-accident inspection and equipment tests 9 1.5 Regulations and guidance 12 1.5.1 General 12 1.5.2 Man overboard 12 1.5.3 Training 13 1.5.4 Safety management 14 1.5.5 New legislation 14 1.6 Survey and inspection of small fishing vessels 14 1.6.1 General 14 1.6.2 Instructions to surveyors 15 1.6.3 Conduct of a survey 15 1.6.4 Deficiencies 16 1.6.5 Deficiency rectification 16 1.7 Pioneer survey and certification 16 1.7.1 History 16 1.7.2 Maritime and Coastguard Agency post-accident inspection 18 1.8 Similar accidents 18 1.8.1 About Time – person overboard 18 1.8.2 St Amant – person overboard 18 1.8.3 Fram of Shieldaig – person overboard 19 SECTION 2 – ANALYSIS 20 2.1 Aim 20 2.2 Overview 20 2.3 The accident 20 2.3.1 The fall overboard 20 2.3.2 Survivability 20 2.3.3 The recovery 21 2.3.4 Raising the alarm 21 2.4 Safety management 22 2.4.1 Vessel operation 22 2.4.2 Emergency preparedness 22 2.4.3 Perception of hazards and risk assessment 22
- 5 Maritime and Coastguard Agency vessel inspection
23 2.5.1 Instructions to surveyors 23 2.5.2 Pioneer inspections 23 2.5.3 Deficiency management 23 SECTION 3 – CONCLUSIONS 25 3.1 Safety issues directly contributing to the accident that have been addressed or resulted in recommendations 25 3.2 Other safety issues directly contributing to the accident 25 3.3 Safety issues not directly contributing to the accident that have been addressed or resulted in recommendations 25 3.4 Other safety issues not directly contributing to the accident 25 SECTION 4 – ACTION TAKEN 26 4.1 MAIB actions 26 4.2 Actions taken by other organisations 26 SECTION 5 – RECOMMENDATIONS 27 FIGURES Figure 1: Location of accident and track of Pioneer Figure 2: Pioneer's deck arrangement Figure 3: View of aft deck bulwark with a person who is 172cm tall standing adjacent Figure 4: Pioneer’s VHF digital selective calling radio Figure 5: Pioneer’s wheelhouse windows Figure 6: Pioneer’s wheelhouse at time of MAIB examination Figure 7: Pioneer’s gill nets and fuel filler access point with cover missing Figure 8: Personal flotation devices hanging on Pioneer’s door Figure 9: Pioneer’s four-person liferaft Figure 10: Pioneer’s manual bilge pump Figure 11: Pioneer at time of the MCA survey (November 2020) ANNEXES Annex A: Pioneer’s risk assessment document Annex B: Comparison of deficiencies recorded during MCA inspections before and after the accident Annex C: MAIB safety flyer to the fishing industry
GLOSSARY OF ABBREVIATIONS AND ACRONYMS °C
degrees Celsius CPR
cardiopulmonary resuscitation DSC
digital selective calling EPIRB
Emergency Position Indicating Radio Beacon FISG
The Fishing Industry Safety Group GMDSS
Global Maritime Distress and Safety System HRU
hydrostatic release unit ILB
inshore lifeboat m
metre “Mayday”
the international distress signal (spoken) MCA
Maritime and Coastguard Agency MGN
Marine Guidance Note
MGN 411 (M+F)
Training and Certification Requirements for the Crew of Fishing Vessels and their Applicability to Small Commercial Vessels and Large Yachts MGN 570 (F)
Fishing Vessels: Emergency Drills MGN 571 (F)
Fishing Vessels: Prevention of Man Overboard MGN 588 (F)
Compulsory Provision and Wearing of Personal Flotation Devices on Fishing Vessels MMSI
Maritime Mobile Service Identity MOB
man overboard MSIS
Marine Survey Instructions for the Guidance of Surveyors MSN
Merchant Shipping Notice MSN 1871 (F)
The Code of Practice for the Safety of Small Fishing Vessels
of less than 15m Length Overall Perspex
a strong clear plastic sometimes used instead of glass
PFD
personal flotation device PLB
personal locator beacon RNLI
Royal National Lifeboat Institution
Seafish
Sea Fish Industry Authority
SFVC
Small Fishing Vessel Certificate UTC
universal time coordinated VHF
very high frequency W
watt TIMES: all times used in this report are UTC+1 unless otherwise stated.
Pioneer Image of a bow to stern port side view of the potting vessel stern on to the shoreline on a beach.
1 SYNOPSIS On the morning of 29 July 2021, the skipper of the UK registered fishing vessel Pioneer (NN200) accidently entered the water as the vessel was heading back to its beach standing in Hastings, England. Pioneer’s sole deckhand was unable to pull him back on board and the skipper was later recovered from the water with the help of a rescue helicopter’s winchman and airlifted to hospital, but he could not be revived. The MAIB investigation found that Pioneer had a low bulwark at its aft deck, which did not prevent the skipper’s fall into the water. At the time of the accident neither the skipper nor deckhand were wearing a personal flotation device, although two were available on board. Critical safety equipment was either missing, incorrectly fitted or out of date. There were no risk assessments held on board, emergency drills had not been practised and the skipper had not undertaken mandatory risk awareness training. Collectively, these deficiencies indicated that Pioneer was being operated with a low standard of safety management at the time of the accident. Pioneer held a Small Fishing Vessel Certificate; however, a post-accident inspection carried out by the Maritime and Coastguard Agency found 21 safety critical deficiencies, five of which had been recorded during the previous vessel inspection 8 months before the accident. The investigation concluded that the instructions to Maritime and Coastguard Agency surveyors did not contain robust guidance to ensure that successive surveys were comparable and to a consistent standard. Since the accident, the Maritime and Coastguard Agency has mandated that small fishing vessels have a minimum bulwark height of 1000mm and a means to recover an unconscious person from the water. The MAIB has made a recommendation to the Maritime and Coastguard Agency to revise its guidance to surveyors to provide clear instructions on how to complete surveys and inspections, record the checklist used to identify findings and close out deficiencies.
2 SECTION 1 – FACTUAL INFORMATION 1.1 PARTICULARS OF PIONEER AND ACCIDENT VESSEL PARTICULARS Vessel’s name Pioneer Flag UK Classification society Not applicable IMO number/fishing numbers NN200 Type Potter Registered owner Privately owned Manager(s) Not applicable Construction glass reinforced plastic Year of build 1988 Length overall 7.94m Registered length 7.94m Gross tonnage Not applicable Minimum safe manning Not applicable Authorised cargo Fish/shellfish VOYAGE PARTICULARS Port of departure Hastings, England Port of arrival Hastings, England Type of voyage Fishing Cargo information Fish Manning 2 MARINE CASUALTY INFORMATION Date and time 29 July 2021 at about 0853 Type of marine casualty or incident Very Serious Marine Casualty Location of incident Hastings, England Place on board Aft main deck Injuries/fatalities 1 fatality Damage/environmental impact None Ship operation Underway Voyage segment Mid-water External & internal environment Wind south-westerly force 5 to 7, clear; moderate seas, 2m swell; sea temperature 16°C to 17°C Persons on board 2
3 1.2 NARRATIVE 1.2.1 The accident At 0520 on 29 July 2021, the UK registered potter/gill netter Pioneer (NN200) set off from its beach standing at Hastings, England with the vessel’s owner/skipper (the skipper) and a deckhand on board. The skipper was at the helm, and it took less than an hour for the vessel to reach its fishing grounds on Shingle Bank, about 6.3 nautical miles to the south of Hastings (Figure 1). Pioneer was moving in a moderate 2m swell at the fishing grounds. The skipper and deckhand shot away four gill nets before beginning to recover the four nets they had set during the previous fishing trip. The skipper and deckhand used the net hauler mounted on Pioneer’s bow to bring in three of the gill nets; the recovery of each net and the sorting of the catch took approximately 25 minutes. At about 0755, they started searching for the fourth net but were unable to locate its marker buoy. The skipper and deckhand removed their personal flotation devices (PFD), put them in the wheelhouse, and then stowed one of the gill nets in a storage bin. Figure 1: Location of accident and track of Pioneer Nautical c hart zoome d in to th e south-ea st coast o f England shows the locations of Eastbou rne to the east and Hastings to the west. An label wi th an arrow denotes th e loca tion of the fishing grounds in the sea to the south of Hastings and a red line shows Pioneer’s track from Hastings to the fishing grounds and back to the beach following the accident. A red dot between the fishing grounds and Hastings on the return journey denotes the location of the accident. © Made Smart Group BV 2023 © i4 Insight 2023 charts are none type approved and for illustration purposes only Eastbourne Hastings Nautical ch art zoomed in to the a ccident loc ation. A re d line deno tes Pioneer ’s track no rth from th e fishing g rounds befor e the vessel begins seve ral triangul ar move ments, at the centre of which an 0854 time label with an arrow points to the approximate position of the man overboard. The vessel then starts heading steadily north-east and two thirds of the way along it an 0921 time label with an arrow points to the approximate position of the vessel when the “Mayday” call was made. 0854: Approximate position of man overboard 0921: Approximate "Mayday" Accident location Fishing grounds
4 At 0814, the sea conditions were becoming rough and the skipper decided to abandon the search for the fourth gill net and return to the beach standing, ahead of the predicted low tide. The skipper set Pioneer’s heading to a northerly direction and secured the helm with a rope lashing. The vessel was trimmed slightly by the bow1 and so the skipper and deckhand moved a bin filled with nets from the forward part of the freeboard deck and jammed it against the aft port elevation of the wheelhouse. The deckhand then returned to the wheelhouse to adjust the vessel’s course while the skipper remained outside on the aft deck. At about 0853, the deckhand had just released the helm lashing when they heard the skipper cry out. The open door of the wheelhouse blocked the deckhand’s view of the starboard side of the aft deck and, when they stepped out of the wheelhouse, they saw that the skipper was in the water some distance aft of the vessel. The skipper was struggling to stay afloat and was calling for help (Figure 1). The deckhand immediately released the life ring that was stowed outside the wheelhouse and threw it towards the skipper. The life ring did not have a line attached to it and landed some distance away from the skipper, who managed to swim a few strokes towards it. Meanwhile, the deckhand returned to the wheelhouse and attempted to make a “Mayday” call on the very high frequency (VHF) radio but received no response. The deckhand then manoeuvred Pioneer around in a circle, bringing the skipper on to the vessel’s windward side. By this time, the skipper was motionless with his face in the water. The deckhand reduced Pioneer’s engine speed to just above tick over as they approached the skipper and brought the boat to a stop. The deckhand used a boathook to pull the skipper to Pioneer’s starboard aft quarter and made repeated attempts to haul him on board, but the skipper was too heavy for the deckhand to lift out of the water. The deckhand slipped a rope under the skipper’s arms and tied it off to Pioneer’s starboard aft quarter, then returned to the wheelhouse to call for help. 1.2.2 Emergency response At 0921, the deckhand successfully transmitted a “Mayday” call using the VHF radio, passing details of the accident to the coastguard and requesting immediate assistance. The deckhand returned to the aft deck, unlashed the rope and pulled the skipper through the water to the starboard forward quarter. The deckhand secured the rope to a deck cleat and used a knife to cut away the skipper’s oilskins before making further unsuccessful attempts to recover him on board. At 0939, the coastguard tasked a rescue helicopter and Royal National Lifeboat Institution (RNLI) inshore lifeboat (ILB) and all-weather lifeboat to the incident. At 0958, the helicopter arrived on scene and a winchman was lowered onto Pioneer’s deck. The winchman and the deckhand recovered the unconscious skipper back on board the vessel and carried him to the aft deck. At 1013, the ILB arrived and transferred one of its crew onto Pioneer. At 1019, having airlifted the skipper and winchman from the vessel, the helicopter departed for Eastbourne District General Hospital. The ILB crew member assisted the deckhand to navigate Pioneer back to Hastings where, at about 1100, the vessel was hauled onto its beach standing. At 1125, the skipper was declared deceased at the hospital. 1 This occurs when the draught (water level) is higher at the bow of a vessel than it is at the stern.
5 1.2.3 Environmental conditions The accident happened during daylight hours in good visibility and dry weather conditions. The sea conditions comprised moderate waves with a 2m swell and a water temperature of between 16°C and 17°C. The wind was south-westerly, Beaufort force 5 to 7. 1.3 THE CREW Pioneer was normally operated by the skipper and one deckhand. 1.3.1 Skipper Pioneer’s skipper, Gary Cornelius, was a 58-year-old career fisherman who had owned several fishing vessels before he purchased Pioneer in 2016. He was able to swim and, with the exception of the Safety Awareness and Risk Assessment course, had completed the mandatory safety training required to serve on a UK fishing vessel. At the time of the accident, the skipper was wearing casual clothing under his oilskins and boots. It was reported that he had been recovered from man overboard (MOB) incidents on three previous occasions, one of which had been from Pioneer. 1.3.2 Postmortem The postmortem report recorded the skipper’s approximate height as 172cm and weight as 71kg. Toxicology test results indicated a negative result for drugs and alcohol. The skipper had no external injuries but there was evidence he had suffered a cardiac arrest and had underlying ischaemic heart disease2. His cause of death was recorded as ischaemic heart disease and dry drowning. 1.3.3 Deckhand The deckhand was 59 years old and had served on a variety of ships and fishing vessels throughout their career. Besides completing mandatory safety training the deckhand had obtained a Seafish Industry Authority (Seafish)3 Under 16.5m Skipper’s Certificate (Restricted) in 2001 and had completed a Global Maritime Distress and Safety System (GMDSS) radio course in 2010. The deckhand had known the skipper and his family for over 30 years and had joined Pioneer in December 2020, having also worked on board the fishing vessel during 2018 and 2019. The deckhand had previously fallen over the side of a fishing vessel and been recovered back on board; they had also successfully recovered fellow crew members who had fallen overboard from small vessels they were working on. 2 Narrowing of the arteries that feed the heart, more commonly known as coronary heart disease. 3 Seafish is a non-departmental public body that supports and provides training to the UK seafood industry.
6 1.4 PIONEER 1.4.1 General Pioneer (Figure 2) was a 7.94m glass reinforced plastic vessel built in 1988 in Dover, England. The vessel was powered by a 63 kilowatt engine, which was housed in a compartment below a hatch forward of the wheelhouse on the freeboard deck. Pioneer’s freeboard deck was enclosed by a 600mm high bulwark (Figure 3). Port and starboard guardrails extended from the aft quarters to midships. Each rail comprised a horizontal pipe, supported between two vertical stanchions, that stood 370mm above the top of the bulwarks and were approximately 970mm above the freeboard deck. The nine freeing ports, located in the port and starboard bulwarks at freeboard deck level, allowed water to drain from the deck into the sea; there were no other bulwark openings. Forward of the guardrails, the height from the waterline to the top of the bulwark was approximately 930mm. A pot hauler was mounted on the vessel’s port bow and a net hauler was mounted opposite this on the starboard bow. The gill nets were stowed in plastic bins on the freeboard deck when not in use. Two rectangular metal grab handles were mounted externally, one above the other, on the port bow (see Figure 2 inset). Pioneer’s enclosed wheelhouse was accessed by a door on its starboard side, which opened inwards. There was a small deck area aft of the wheelhouse. The wheelhouse was equipped with the engine’s throttle control, a helm, two global positioning system plotters and a fixed dual watch4 VHF radio set with digital selective calling (DSC5) capability, that enabled distress messages to be sent (Figure 4). The dual watch VHF radio had two power output settings: a low power 1 watt (W) setting that was used for short, local transmission ranges and a high power 25W setting that was used for long distance and distress transmissions. The Maritime Mobile Service Identity (MMSI)6 number could be programmed via the dual watch VHF radio’s setup menu; instructions for how to do this were available online. 4 Dual watch enables VHF channel 16 and another preset VHF channel to be monitored simultaneously by switching between them. 5 Digital selective calling is a digital alerting system that, on the press of a single button, can send a vessel’s identity, position and the nature of its distress to all DSC-equipped vessels and shore stations within range. 6 The MMSI number was a nine-digit sequence that was unique to each vessel and enabled any distress message sent via DSC to be attributed to it.
7 Figure 2: Pioneer's deck arrangement For illustrative purposes only: not to scale Four-person liferaft on top of wheelhouse Aerial Pot hauler Aft deck Manual bilge pump Freeboard deck Net hauler Grab rail Door 600mm high bulwark Guardrail 370mm Approximately 930mm Engine compartment below hatch Waterline Freeing port Close-up of the port bow shows two horizontal handles fixed in the side of the hull one above and slightly aft of the other. Grab handle
8 Figure 3: View of aft deck bulwark with a person who is 172cm tall standing adjacentA person stands on Pioneer’s aft deck looking out to sea from the vessel’s beach standing. The top of the person’s thigh is level with the top of the bulwark. A small gap at the base of the bulwark next to their right foot is labelled as a freeing port. Arrows with a label pointing to the top and bottom of the bulwark show a height of 600mm. 600mm bulwark Freeing port View from the wheelhouse towards a small item of equipment suspended above a cracked window via an integrated handle. A handheld receiver plugged into the lower left side of the unit via a length of coiled wire hangs on the bulkhead to the left of the window. Figure 4: Pioneer’s VHF digital selective calling radio
9 1.4.2 Operation Pioneer operated as a potter or a static/gill netting vessel and mainly fished for whelks and white fish such as cod, monkfish and haddock. When gill netting, the crew typically shot the net from Pioneer’s aft deck by throwing the float, Danline rope and anchor into the water, followed by the net. The net was recovered by retrieving the float and heaving the Danline rope and net back on board using the bow-mounted net hauler. The catch was sorted into boxes and later landed in Hastings, where it was sold to a local fish merchant. A shed that was located approximately 60m from Pioneer’s beach standing was used as an office and for storage of loose fishing equipment. Pioneer and other fishing vessels that used the beach standings had experienced theft and vandalisation so it was common for owners to remove loose equipment from their beached vessels for safe storage elsewhere. Safety drills were not carried out on board Pioneer. 1.4.3 Post-accident inspection and equipment tests Investigators examined Pioneer at its beach standing on 30 July and 31 July 2021. The wheelhouse was fitted with three windows on its forward elevation (Figure 5a), two on its port side (Figure 5b), one on its starboard side (Figure 5c), and two on its aft elevation (Figure 5d). The window panes were made of Perspex7 and were all semiopaque, scratched and/or cracked. The window on the starboard side of the aft elevation became partially obscured when the wheelhouse door was open and tied back, limiting visibility to the aft deck. Further inspection of the wheelhouse found that: the electrical switch panel for the lights was lying loose on the console above the helm (Figure 6a); the wire terminals of the 12-volt direct current battery were fully exposed (Figure 6b); a toolbox had been used to cover a hole in the deck (Figure 6c); and the contents of the first aid kit had expired (Figure 6d). In the engine compartment, the engine’s cooling water expansion cap was missing and a smoke and heat fire detector was lying on a shelf, having been detached from its base. Two gill nets were lying loose on the freeboard deck (Figure 7a) and one net was stowed in a plastic bin (Figure 7b) on the port side of the aft deck. A 140mm hole in the deck just aft of the bin was missing its cover, exposing the access to the fuel filler. Two 150N8 auto inflate PFDs were found hanging on the inside of Pioneer’s wheelhouse door (Figure 8), one of which was in a clear plastic pouch with a zip that was corroded and jammed. The outer fabric to both PFDs was torn and dirty and neither had been serviced since 2013. 7 A strong transparent plastic, which is sometimes used instead of glass. 8 A Newton is a metric measurement of force used to indicate lifejacket buoyancy.
10 Figure 5: Pioneer’s wheelhouse windows Close-up view from the vessel’s starboard deck towards the forward wheelhouse windows. The structure around each of the three window panes is heavily stained with brown marks and each of the semiopaque window panes is cracked, particularly the starboard forward window. View from the beach towards the starboard side of the wheelhouse, showing a semiopaque window pane stained with brown splash marks that have also accumulated around the window’s structure. Aft of the window is a door the height of the wheelhouse and hinged on the left-hand side. There is a door handle on the right-hand side, below which is a hasp hinge for securing the door. View from the aft deck towards the two aft wheelhouse windows, the frames of which are stained with rust where the screws and other fittings are fixed. Both window panes are semiopaque and scratched. Close-up view from the vessel’s port side deck towards the port side forward and two port side wheelhouse windows. The structure around the window panes is heavily stained with brown marks and each of the semiopaque window panes is cracked. a d c b Figure 6: Pioneer’s wheelhouse at time of MAIB examination View from the wheelhouse door to the forward windows, showing a plastic with numerous switches on each side of it lying face-up on the console above the wheel. View down onto a hole in the deck that is partially obscured by a large toolbox. Close-up view of an open first aid box full of first aid items that were found expired. View down onto the deck, showing a length of uninsulated wire. a d c b Loose electrical switch panel Exposed wire on 12 volt DC battery Tool box used to cover hole in deck Hole in deck First aid kit with expired contents
11 A four-person liferaft (Figure 9) was stowed on the port side of the wheelhouse roof and was due to be serviced in February 2022; it was unsecured, there was no hydrostatic release unit (HRU) and its painter was not attached. A manual bilge pump (Figure 10) was mounted on the aft elevation of the wheelhouse. No pipework was attached to the pump. All of the distress flares had expired in December 2017. No safety documents were found on board Pioneer. View aft from the starboard side of the freeboard deck towards shows a pile of fishing nets lying across a large section of the deck in front of the wheelhouse. View from the aft deck towards the manual bilge pump at the foot of the wheelhouse’s port side bulkhead. Adjacent to a freeing port gap in the bulwark is a hole in the deck that is identified with a label as the fuel filler access point. Figure 7: Pioneer’s gill nets and fuel filler access point with cover missing Fuel filler access point a bView from inside the wheelhouse towards an orange vest inside a zipped plastic pouch that is hanging from a hook on the back of the wheelhouse door. Figure 8: Personal flotation devices hanging on Pioneer’s door PFD inside clear plastic pouch Starboard to port view across the top of the wheelhouse roof towards a large white plastic housing stowed latitudinally between two metal grab rails. There are no lashings to indicate it is secured. Figure 9: Pioneer’s four-person liferaft Starboard to port view across the aft deck shows the manual bilge pump mounted to the wheelhouse bulkhead on the right with a label with an arrow pointing to the area of missing pipe on its underside. On the left and adjacent to a freeing port gap in the bulwark is a hole in the deck that is identified with a label as the fuel filler access point. Figure 10: Pioneer’s manual bilge pump Fuel filler access point Manual bilge pump with missing pipework
12 Some paperwork was kept in the skipper’s beach storage shed. This included the Seafish safety folder, containing checklists, and templates and forms for documenting the vessel’s risks and hazards, none of which had been completed. There was also a single page Risk Assessment (Annex A) comprising several generic statements about the operation of the vessel, including ensure all persons on-board are wearing MCA approved PFDs and any defects to be reported immediately upon discovery. The investigation commissioned a specialist to carry out an assessment of the PFD that the skipper was reported to have been wearing just before the accident. The assessment determined that the PFD was in worn condition and confirmed it to be outside its service date. When tested the PFD was found to inflate manually with no gas leakage. It was deemed that it would have automatically inflated and supported the wearer as designed. 1.5 REGULATIONS AND GUIDANCE 1.5.1 General Merchant Shipping Notice (MSN) 1871 (F) Amendment No.1, The Code of Practice for the Safety of Small Fishing Vessels of less than 15m Length Overall, (the Code), came into force on 31 December 2018. The Code included the requirement that unless measures were in place that eliminated the risk of fishermen falling overboard they should be provided with and must wear PFDs or safety harnesses. The Code also referred readers to Marine Guidance Notice (MGN) 588 (F) Compulsory Provision and Wearing of Personal Flotation Devices on Fishing Vessels. The MCA publication Fishermen’s Safety Guide provided further advice on how to identify hazards, put in place control measures to mitigate them and improve safety on board fishing vessels. It identified hazards such as slipping or tripping and falling overboard and reiterated the Code’s requirements on the wearing of PFDs and harnesses; it further asserted that fishermen MUST wear a PFD or a safety harness where risks could not be eliminated. The Code required monthly emergency drills to be carried out to ensure all crew were familiar with the use of the equipment and referred the reader to MGN 570 (F) Fishing Vessels: Emergency Drills, which included a section on MOB drills that guided skippers and crew to: Make sure the retrieval equipment is usable with the levels of manning on board – ensure it can be operated by the crew if one of them has gone overboard; The Code further mandated that, by 23 October 2019, either an Emergency Position Indicating Radio Beacon (EPIRB) was to be carried on board fishing vessels under 10m or each crew member was to be provided with a personal locator beacon (PLB), which was to be worn while working on the open deck. 1.5.2 Man overboard MGN 571 (F) Fishing Vessels: Prevention of Man Overboard provided information on the identification of hazards that might lead to an MOB situation and included a Risk Review Document designed to help fishermen assess and control the risks on board their vessels. Annex C of MGN 571 (F) provided guidance on how to prevent crew from falling overboard, including:
13 Bulwarks and Guardrails Efficient bulwarks or guard rails shall be fitted on all exposed parts of the working deck and on superstructure decks if they are working platforms. The height of bulwarks or guard rails above deck shall be at least 1 m. There should be no gaps or lowpoints except when these are needed for operational reasons, and then they should only be open for the minimum time possible. [sic]; and Visibility of working areas From the wheelhouse it shall be possible to view all workplaces on the weather deck. Where it is necessary to ensure such visibility, the wheelhouse shall be provided with windows to the floor. Both MGN 571 (F) and MGN 570 (F) cautioned that, unless a person was rescued within 5 minutes of falling overboard, it was highly likely that they would be either unable to help themselves or unconscious. During this period the effect of cold shock would result in hyperventilation, increase in blood pressure and an increased risk of drowning or heart failure. The Fishing Industry Safety Group (FISG)9 Home and Dry safety campaign10 provided guidance to the fishing industry on the conduct of emergency drills, the use of PFDs, methods of reboarding vessels from the water and the importance of risk assessments. The RNLI’s website detailed the use of ladders for MOB recovery and showed alternative ways to reboard a vessel from the water, such as hanging tyres over the side. 1.5.3 Training Fishermen serving on board UK registered fishing vessels were required to complete the mandatory safety training courses as detailed in MGN 411 (M+F) Training and Certification Requirements for the Crew of Fishing Vessels and their Applicability to Small Commercial Vessels and Large Yachts. Safety training courses were organised and delivered by Seafish and, while equivalent approved training providers were accepted for some of the UK courses, none were considered to offer a comparable level of competency to the Safety Awareness and Risk Assessment course. New entrants to fishing were required to complete the 1-day Basic Sea Survival training before starting work on board a UK fishing vessel and the Basic First Aid, Basic Fire Fighting and Prevention, and Basic Health and Safety 1-day courses were to be completed within 3 months of starting work as a fisherman. All fishermen with 2 or more years’ experience were required to complete the Safety Awareness and Risk Assessment course, regardless of their nationality. 9 FISG was an industry stakeholder group, whose purpose was to improve the safety of commercial fishing at sea. 10 https://www.homeanddry.uk/
14 1.5.4 Safety management The Merchant Shipping and Fishing Vessels (Health and Safety at Work) Regulations 1997, Regulation 5 stated that an employer had a general duty to: ensure the health and safety of workers and other persons so far as is reasonably practicable To fulfil their general duties, an employer was required to: avoid or minimise risks; evaluate unavoidable risks and take action to minimise them; and adopt safe working practices. Further, the requirements of the Code stipulated that a vessel’s on board safety equipment should be properly maintained and serviced and that an appropriate health and safety risk assessment must be completed. 1.5.5 New legislation On 6 September 2021, approximately 5 weeks after the Pioneer accident, MSN 1871 Amendment No.2 came into force. For new and existing vessels, the amended Code required that: The perimeter of an exposed deck should be fitted with bulwarks, guard rails or guard wires of sufficient strength and height for the safety of persons on deck; the height of tubular railings and guard wires being not less than 1000mm above the deck (915 mm where already fitted)… [sic] The amended Code also stated: Crewed Vessels must have an efficient means of recovering an unconscious person from the water and enable a person in the water to get back on board the Vessel, either by a permanent boarding ladder or means deployable by the crew. [sic] 1.6 SURVEY AND INSPECTION OF SMALL FISHING VESSELS 1.6.1 General Fishing vessels under 15m length overall were inspected by the MCA to verify compliance with the Code and other applicable legislation, after which a Small Fishing Vessel Certificate (SFVC) was issued. The SFVC was valid for 5 years, after which a renewal inspection was required. Fishing vessel skippers were required to endorse the SFVC annually between MCA inspections to confirm their vessel’s ongoing conformity with the Code; the MCA deemed the SFVC to be invalid if the vessel or its operation deviated from the letter of the Code. The 5-yearly SFVC inspection was non-chargeable; however, the MCA charged an hourly rate if a return visit to the vessel was required to check that defects had been rectified. The MCA publication Fishing Vessel Surveys and Inspections: How to prepare for your next MCA visit11 provided advice to help owners, skippers and fishermen ensure the successful outcome of an inspection or survey. The document specified the relevant Code requirements and listed the documents and evidence to be 11 https://www.gov.uk/government/publications/fishing-vessel-survey-guide-for-owners-and-operators
15 available for inspection. This included crew training certificates, safety equipment awareness and risk assessment copies and noted that an MOB risk assessment MUST be written. The guide also advised that the condition of the vessel’s windows would be checked and that blanks should be available for broken external windows. 1.6.2 Instructions to surveyors The MCA provided its surveyors with Marine Survey Instructions for the Guidance of Surveyors (MSIS), detailing the frequency and conduct of vessel surveys and inspections. The applicable instructions in force at the time of Pioneer’s most recent inspection were MSIS 27, Survey and Inspection of Fishing Vessels chapters 1 to 17 (October 2020), and MSIS 38, Instructions to Surveyors – Inspection Policy (July 2020). 1.6.3 Conduct of a survey MSIS 27 comprised 17 chapters and 22 annexes and included specific guidance on fishing vessel safety equipment and MOB procedures: Chapter 1, section 1.21.1 instructed that aide-memoire MSF 5549 must be used for the survey and inspection of fishing vessels under 15m; not all of the checkpoints on the aide-memoire were applicable to vessels under 10m. MSF 5549 also recommended that documented risk assessments should be carried on board and specified that there must be a record of a written MOB risk assessment. The attending inspector/surveyor was advised to take photographs of any defects identified during the inspection and forward these with their report. Chapter 1, Annex 1, section 4.8.2 referenced the use of checklist MSF 1341, which was a record of the minimum safety equipment requirements for a DECKED vessel of less than 10 metres (L). Chapter 11 stated the requirement for regular emergency drills to be completed and instructed the surveyor to check that these had taken place. Where no such record could be produced, it was to be recorded as a deficiency. Chapter 11, section 11.4.3 specified that at least two drills should be undertaken during an inspection of a crewed vessel, one of which was to be an MOB drill to check skipper and crew awareness, including the correct procedure for contacting the coastguard and how to use the MOB systems on board. Chapter 11, section 11.18 addressed the prevention of fishermen falling overboard, specifically the identification of the areas where regular work activity takes place within 1m of deck edging and measures to control the associated risks. It also stated that an MOB risk assessment should set out whether a PFD or safety harness was to be worn if the control measures could not eliminate the risk of an MOB. Appendix B stated that bulwarks and guardrails should be at least 1m above deck. Annex 16 included both MSF 5549 and MSF 1341. In August 2021, to align with the incoming MSN 1871 Amendment No.2, new items were added to the MSF 1341 checklist.
16 1.6.4 Deficiencies MSIS 38, Part B, chapter 1 required inspectors to complete MSF 1602/3 following an inspection to provide a snapshot of the vessel’s condition. All deficiencies, including items identified and closed out during the survey, were to be recorded; however, inspectors were permitted to exercise limited discretion if the vessel was found to be in otherwise good condition. An Improvement Notice, requiring remedial action within 3 months, would be served where it was identified during an inspection that a mandatory basic safety training course had not been completed by the crew on board. This excluded the Basic Sea Survival course, for which a Prohibition Notice would be issued. 1.6.5 Deficiency rectification MCA surveyors recorded the fishing vessel’s details and any identified deficiencies on handwritten reports following each inspection, a copy of which was passed to the vessel owner/skipper. The content of the inspection report would later be entered into PELORUS, the MCA’s electronic ship inspection and survey database. Inspection documents and any photographs taken would be uploaded to the MCA's SharePoint storage system. Vessel owners were required to notify their local MCA marine office when outstanding deficiencies had been rectified. MSIS 27, section 3.2.1, Annex 1 advised that an emailed digital image could be accepted as sufficient evidence that a deficiency had been rectified or to decide that a return visit to the vessel was required. MCA marine office staff would update PELORUS to reflect the outcome and, if applicable, issue a SFVC. 1.7 PIONEER SURVEY AND CERTIFICATION 1.7.1 History Before the accident the MCA had last inspected Pioneer on 26 November 2020, at its beach standing in Hastings. The attending MCA surveyor completed checklist MSF 1341 (Revision 04/18) and identified seven deficiencies (Annex B), all of which were assigned action codes 17 and 98 and required rectification before the vessel could proceed to sea. The surveyor took one photograph of Pioneer during this inspection (Figure 11). On 27 November 2020, the surveyor emailed MCA colleagues informing them of a conversation with the Hastings Fishermen’s Protection Society to: forewarn them that we may be carrying out GI’s on FV’s in Hastings randomly when in the area to check compliance with Safety equipment. [sic]; and As part of this warning I have said enough is enough and from now on any vessel found not to be complying when the GI is carried out. Will be issued with a Prohibition Notice if deemed appropriate for the number of deficiencies or items found to be not on the vessel. [sic]
17 After the inspection the surveyor received copies of receipts from the skipper for the following purchases:
● an EPIRB and handheld VHF DSC radio (receipt dated 1 December 2020, and a delivery note);
● a carbon dioxide fire extinguisher and two battery-powered, radio-interlinked smoke and heat alarms (receipt dated 1 December 2020);
● an HRU for a 4 to12-person liferaft (receipt dated 4 December 2020, and a delivery note); and
● the services of an electrical contractor, which the skipper reported was for the programming of a VHF DSC radio (receipt dated 13 January 2021). On 27 December 2020, the surveyor updated PELORUS with a note that recorded: Photos and various documents where provided covering all aspects of rectification of deficiencies note on the survey. [sic] On 10 January 2021, the surveyor issued an SFVC for Pioneer, which was dated 11 December 2020 and valid until 11 November 2025. Later in 2021, before the accident, the MCA surveyor returned to the Hastings beach standing to inspect another fishing vessel; Pioneer was out fishing at the time. View along the starboard side of Pioneer from the starboard bow while the vessel is out of water on a beach. The starboard net hauler is on the left of the bow and the port pot hauler is on the right. An H-shaped guardrail is fitted along the bulwark adjacent to the wheelhouse door. On the beach there are several crates and containers next to the vessel’s hull. Figure 11: Pioneer at time of the MCA survey (November 2020)
18 1.7.2 Maritime and Coastguard Agency post-accident inspection On 30 July 2021, the day after the accident, a targeted post-accident inspection of Pioneer and its safety equipment was carried out by another MCA surveyor using a Checklist of requirements (based on MSN 1871 Amendment No.1) and aide-memoire MSF 5549. A total of 21 deficiencies were recorded during the inspection, five of which had previously been noted in the November 2020 inspection (Annex B). None of the equipment that the skipper had reported as being purchased after the November 2020 inspection was found either on board or in the beach storage shed. Further, Pioneer’s MMSI number had not been programmed into the VHF DSC radio and no EPIRB had been registered to the vessel. The MCA surveyor detained Pioneer due to the number of safety critical deficiencies that the post-accident inspection had identified. During the inspection it was stated that the owners of some fishing vessels had, in the past, borrowed other vessels’ safety equipment to enable them to pass an MCA inspection. 1.8 SIMILAR ACCIDENTS 1.8.1 About Time – person overboard On 14 June 2011, the 11.9m potting vessel About Time was on passage in good weather when a deckhand was lost overboard. The investigation (MAIB report 5/201212) found that the accident was most likely due to the deckhand tripping and falling over a low bulwark. A recommendation was made to the vessel’s owner to improve the safety of the on board working practices and the crew’s hazard awareness. 1.8.2 St Amant – person overboard During the early hours of 13 January 2012, a deckhand was lost overboard from the 17.8m scallop dredger St Amant as it was on passage towards fishing grounds in Cardigan Bay. The investigation (MAIB Report 1/201313) considered it likely that the deckhand fell over the vessel’s aft bulwarks, probably while in the process of relieving himself, or had slipped on part of the fishing gear stowed on deck. He was not wearing a PFD at the time. The investigation established that the vessel had been granted an exemption from complying with the minimum height requirements for bulwarks, which had not been reviewed, and that a large proportion of the deficiencies identified during previous surveys and inspections had not been confirmed as rectified. The condition and the standard of housekeeping on board St Amant at the time of the accident were found to be poor. Recommendations were made to the MCA to review and clarify aspects of its survey and inspection policy for fishing vessels. These included procedures for the review and deletion of exemptions; the management of outstanding deficiencies; and the introduction of a policy and procedure for conducting detailed inspections of fishing vessels following serious accidents. 12 https://www.gov.uk/maib-reports/person-overboard-from-potter-about-time-off-the-pembrokeshire-coast- wales-with-loss-of-1-life 13 https://www.gov.uk/maib-reports/person-overboard-from-scallop-dredger-st-amant-off-the-north-west-coast- of-wales-with-loss-of-1-life
19 1.8.3 Fram of Shieldaig – person overboard On 7 August 2018, a deckhand from the 9.8m potting vessel Fram of Shieldaig entered the water while manoeuvring a small tender alongside the moored fishing vessel. No one witnessed the deckhand enter the water, but the investigation (MAIB report 8/201914) found that it was likely he slipped or stumbled as he moved forward from his seated helm position while preparing to pass the tender’s painter to the potting vessel’s skipper. The deckhand subsequently drowned because he was not wearing a lifejacket and the skipper was unable to recover him from the water unaided. 14 https://www.gov.uk/maib-reports/man-overboard-from-potter-fram-of-shieldaig-with-loss-of-1-life
20 SECTION 2 – ANALYSIS 2.1 AIM The purpose of the analysis is to determine the contributory causes and circumstances of the accident as a basis for making recommendations to prevent similar accidents occurring in the future. 2.2 OVERVIEW The skipper of Pioneer was standing on the vessel’s aft deck adjacent to a low bulwark when he fell overboard. Once in the water, and without a PFD, the skipper attempted to swim to the life ring that had been thrown to him but struggled to stay afloat in the developing swell. Pioneer’s deckhand brought the vessel alongside the skipper but was unable to recover him on board. The skipper was unresponsive when he was eventually rescued from the sea with the help of a coastguard rescue helicopter winchman. This section of the report will consider the factors that caused the skipper to fall overboard, the inability to quickly recover him and the management of safety on board Pioneer. The condition and inspection of the vessel will also be analysed. 2.3 THE ACCIDENT 2.3.1 The fall overboard The skipper was alone on Pioneer’s aft deck just before the accident and it is possible that the vessel’s movement in the 2m swell caused him to lose his footing, which in turn led his centre of gravity to momentarily act outboard of the bulwark and result in his fall overboard. It is also possible that an obstacle on Pioneer’s relatively small aft deck, such as the net box or missing fuel filler cover, caused the skipper to trip and stumble over the vessel’s side. Further, as the skipper had a pre-existing heart condition it cannot be ruled out that he suffered a non-fatal heart attack that caused him to fall overboard. In each of these scenarios the low bulwark height, which was approximately coincident with the skipper’s knee height, offered little protection from a fall over the vessel’s side. Similar to the About Time and St Amant accidents, a bulwark height of 1000mm, recommended in both MGN 570 (F) and MSIS 27 and now mandatory for fishing vessels of 15m or less length overall following Amendment No. 2 of the Code, combined with the wearing of a tethered safety harness would have mitigated the risk of falling overboard. The deckhand was close by in the wheelhouse; however, the damaged windows and open door blocked the skipper from their view and the deckhand did not see the skipper enter the water, delaying their response to the MOB situation. The deckhand’s options to effect an immediate rescue were further reduced because, by the time they became aware of the accident, Pioneer had travelled some distance from where the skipper had entered the water. 2.3.2 Survivability The Code mandated the wearing of a PFD by each crew member while working on board Pioneer as no risk mitigation existed to prevent a fall overboard. The skipper was alive but in distress when the deckhand responded to his call for help; had he
21 been wearing his PFD, which was later proven to be operational, it would most likely have automatically inflated upon his entry into the water. Less effort would therefore have been required from the skipper to stay afloat while wearing oilskins and boots and it is likely his airway would have been kept clear of the water, lowering his risk of drowning. It is probable that the panic induced by the stress and exertion required by the skipper to stay afloat, combined with the shock of entering relatively cold water and his existing heart condition, caused a fatal heart attack and dry drowning. 2.3.3 The recovery The life ring thrown to the skipper did not have a line attached to it so the deckhand would not have been able to pull the skipper back to the vessel even if he had been able to swim to it. Had the skipper remained conscious he might have been able to swim to and reboard Pioneer using the grab handles fitted to the port bow (see Figure 2). The lack of MOB recovery equipment meant the deckhand had limited options to recover the skipper other than to attempt to manually lift him back on board. Similar to the Fram of Shieldaig accident, the weight of the unconscious skipper in waterlogged clothing, combined with his inability to help in his own rescue and the height of the bulwark above the waterline, made it impossible for the deckhand to haul the skipper back on board. During the attempted recovery the deckhand placed themselves at considerable risk of falling overboard, which was not mitigated as they were neither wearing a safety harness tethered to Pioneer nor a PFD. 2.3.4 Raising the alarm Pioneer’s VHF DSC radio was equipped with an emergency distress alert function but the MCA’s post-accident survey identified that the MMSI number had not been programmed into the radio. Had the deckhand attempted to use the alert function it would have been unclear to listening stations that Pioneer was the vessel in distress, thereby delaying potential assistance from any nearby vessels. The deckhand attempted to make a “Mayday” call on the VHF DSC radio from the wheelhouse after throwing the life ring to the skipper in the water. The investigation could not establish whether this initial call went unheard because the radio was not transmitting on high power, thereby limiting its range, or if the dual frequency radio had not been set to transmit on VHF channel 16. The deckhand had completed their GMDSS training many years before the accident and so could have been unfamiliar with the VHF DSC radio system on board. This might have impeded the deckhand’s ability to send a distress message at the first attempt during the highly stressful MOB situation. The time difference between the deckhand’s first attempt at making a “Mayday” call and the successful call was almost 30 minutes, which delayed the tasking and arrival on scene of the rescue helicopter and lifeboats. The deckhand made
22 every effort to recover the skipper during the intervening period; however, it cannot be known what effect the delay in tasking rescue support had on the outcome of this accident. 2.4 SAFETY MANAGEMENT 2.4.1 Vessel operation The windows of Pioneer’s wheelhouse were semiopaque and cracked, which limited visibility and was contrary to the MGN 571 (F) requirement that good visibility of deck areas should be maintained to facilitate early awareness of an MOB situation. Other safety critical defects and trip hazards on the aft deck were also present on the day of the accident, thereby increasing the risk of an MOB. The SFVC issued to Pioneer in January 2021 had been rendered invalid as on board safety equipment was either missing or in poor condition. Although there was some evidence of the skipper’s attempts to comply with the safety regulations, neither the EPIRB nor handheld VHF DSC, for which he had supplied purchase receipts, were found on board the vessel during the post-accident inspections. Collectively, these deficiencies indicated that the vessel was being operated with a low standard of safety management at the time of the accident. 2.4.2 Emergency preparedness The Code introduced a mandatory requirement for the crew of fishing vessels to complete regular drills to ensure that they understood their emergency duties and were used to practising them. Because drills were not conducted on board Pioneer its crew missed an opportunity to identify the absence of documented procedures and MOB equipment, or to appreciate how difficult it would be for a lone crew member to effect an MOB recovery. 2.4.3 Perception of hazards and risk assessment Of the documents found in the beach storage shed, the Seafish safety folder risk assessments had not been completed and the risk assessment document neither detailed individual hazards nor proposed how to guard against them. Consequently, controls such as the use of tethered safety harnesses were not put in place to mitigate the risk of falling overboard. Both the skipper and the deckhand were used to working on Pioneer’s open deck and were probably aware of the low bulwark at the aft deck from where the gill nets were shot. The 970mm high tubular rail above the bulwark did not encircle the deck and so did not mitigate the risk of a fall overboard while working next to the pot hauler, the net hauler or on the aft deck. It is possible the crew did not frequently use the aft deck while at sea and so did not consider the low bulwark height to be a significant hazard in their daily operation. Both the skipper and the deckhand had previously experienced successful MOB recovery situations while fishing; it is possible, therefore, that they considered the risk of falling overboard to be part of normal fishing operations, and were overconfident in their ability to recover either themselves or each other back on board.
23 It is also possible that the skipper did not have a full appreciation of the risks involved when moving about a vessel of Pioneer’s design because he had not completed the Safety Awareness and Risk Assessment course. 2.5 MARITIME AND COASTGUARD AGENCY VESSEL INSPECTION 2.5.1 Instructions to surveyors MCA surveyors were provided with an array of instructions with the aim that inspections were completed to a common standard. However, the system was designed to be a flexible framework that permitted the attending surveyor to apply their own expertise and judgement. It is possible that the volume of MSIS documents, combined with the need to use both a checklist and an aide-memoire to carry out inspections of fishing vessels, could lead to confusion among MCA surveyors. MCA surveyors were not required or able to upload their inspection checklists to PELORUS. With relevant documents stored in two different systems, it is possible the differences in the application of the MSIS instructions went unnoticed, leading to unchecked variances across inspections and surveys. 2.5.2 Pioneer inspections It is likely that the MCA’s November 2020 inspection of Pioneer was not conducted using aide-memoire MSF 5549 and possibly resulted in a number of deficiencies being missed, including the low bulwark height and the poor visibility from inside the wheelhouse. Both of these deficiencies were contrary to MGN 571(F) and the instructions to surveyors, and were apparent in the photograph taken at the time of inspection. The lack of safety training certification for the skipper and absence of a written MOB risk assessment as required by the Code also went unrecorded. The MCA inspection carried out in July 2021 was conducted using MSF 5549 and with the knowledge that a fatal MOB had occurred, so it is likely that this inspection was more rigorous. The condition of Pioneer, its safety equipment and risk assessment at the time of this inspection, was such that it was unlikely that the vessel’s deterioration had occurred during the 8 months between inspections and probable that some of the deficiencies were pre-existing. 2.5.3 Deficiency management It is evident that the MCA surveyor who conducted the November 2020 inspection was content with the evidence of purchase provided by the skipper and so chose not to return to Pioneer to close out deficiencies to avoid imposing considerable cost to the skipper for a second inspection. The instructions to surveyors did not explicitly require a revisit to the vessel to verify the remedial action taken. It is unknown what happened to the safety equipment purchased by the skipper after the November 2020 inspection; however, the receipts and delivery notes submitted as evidence of their purchase provided the basis to close out the seven recorded deficiencies and issue the SFVC for the vessel. Whether the MCA surveyor was supplied with photographic evidence of the new safety equipment in position on board Pioneer could not be determined, although it is possible that this equipment could have been removed after any photographs had been sent.
24 It is apparent that the MCA surveyor was concerned about the Hastings fishing fleet’s safety equipment, and it is likely they would have revisited Pioneer while carrying out fishing vessel inspections there in 2021. Had the surveyor been able to visit Pioneer, it is possible the apparent lack of deficiency rectification might have resulted in the vessel being issued with a notice prohibiting it from operating. The instructions for surveyors required that sufficient evidence must be supplied for deficiencies to be closed out. While intended to provide a measurable level of assurance to surveyors that deficiencies had been adequately rectified, the system was open to wide interpretation and relied on trust. With the exception of an EPIRB, there was no requirement for safety equipment to either be registered to a specific vessel or labelled as belonging to that vessel, which was open to abuse as safety equipment had reportedly been moved between vessels solely to pass an inspection.
25 SECTION 3 – CONCLUSIONS 3.1 SAFETY ISSUES DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS 1. The low bulwark around the aft deck offered little protection from falling overboard, and the skipper was not wearing a tethered safety harness to mitigate the risk of falling overboard. [2.3.1] 2. The lack of an effective means of recovering an unconscious person and the absence of MOB drills impeded the deckhand’s ability to recover the skipper from the water. [2.3.3, 2.4.2] 3.2 OTHER SAFETY ISSUES DIRECTLY CONTRIBUTING TO THE ACCIDENT 1. The skipper’s fall into the water was not observed but could have been the result of the vessel’s movement, a slip or trip, or a non-fatal heart attack. [2.3.1] 2. The skipper died because of immersion in the water leading to a heart attack and dry drowning. [2.3.2] 3. The skipper was not wearing a PFD and it would have taken considerable effort to remain afloat in the developing swell. [2.3.2] 4. The skipper had a pre-existing heart condition, which combined with the effect of cold water shock may have affected his ability to respond to this accident. [2.3.2] 5. The skipper had not completed the Safety Awareness and Risk Assessment course and so may not have had a full appreciation of the risks associated with his vessel’s operation. [2.4.2, 2.4.3] 3.3 SAFETY ISSUES NOT DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS 1. The MCA’s inspection of Pioneer in November 2020 did not identify that the bulwark height around the stern of the vessel was inadequate or that the wheelhouse windows were semiopaque. [2.5.2] 2. The inspection and survey guidance and close out of deficiencies for MCA surveyors did not result in the application of a consistent standard during these assessments. [2.5.1, 2.5.3] 3.4 OTHER SAFETY ISSUES NOT DIRECTLY CONTRIBUTING TO THE ACCIDENT 1. The effect of the delay in the receipt of the VHF “Mayday” call by the coastguard on the outcome of this accident cannot be known. [2.3.4] 2. Pioneer’s wheelhouse windows were broken and semiopaque to the extent that all-round visibility was severely impaired, there were a number of trip hazards, and essential safety equipment was either out of date for service or missing. Collectively, these deficiencies indicated that the vessel was being operated with a low standard of safety management at the time of the accident. [2.4.1]
26 SECTION 4 – ACTION TAKEN 4.1 MAIB ACTIONS The MAIB has issued a safety flyer to the fishing industry (Annex C). 4.2 ACTIONS TAKEN BY OTHER ORGANISATIONS The Maritime and Coastguard Agency has:
● In September 2021, published MSN 1871 Amendment No.2 mandating a minimum bulwark height of 1000mm on fishing vessels and a means to recover an unconscious person from the water.
● In August 2021, updated checklist MSF 1341 to include, Means of Recovering unconscious/helpless person from water and, if single handed, means of getting back on board Vessel, deployable from the water. [sic]
27 SECTION 5 – RECOMMENDATIONS The Maritime and Coastguard Agency is recommended to: 2024/169 Revise its instructions for the guidance of surveyors to provide clarity on the conduct and recording of fishing vessel surveys and inspections, and review its guidance on the closing out of deficiencies.
Annex A Pioneer’s risk assement document
Annex B Comparison of deficiencies recorded during MCA inspections before and after the accident
Deficiency Code Action Code November 2020 (pre accident) inspection summary of finding July 2021 (post accident) inspection_ summary of finding Action Code Certificates 17&98 Radio license to produce
17&98 Seafarer’s employment agreement 17&98 To be provide for each crewmember
17&98 Fire fighting equipment and appliances 17&98 New fire extinguishers to provide Multi purpose fire extinguisher not onboard 17&98 VHF radio installation 17&98 MMSI Number to be programmed to main VHF and portable VHF required for lifeboat VHF DSC set MMSI to program. Portable VHF set for use with liferaft not located on board 17&98 Fire detection and alarm system 17&98 Fire detectors to be linked between wheelhouse and engine room Engine room/wheel house linked fire detectors not operational 17&98 Inflatable life rafts 17&98 Liferaft to be correctly installed HRU missing painter not installed 17&98 Satellite EPIRB 17&98 PLBs for crew or EPIRB for vessel to be provided EPIRB and/or GPS 406 MHz PLB per person not located on board 17&98 Lifejackets incl. provision and disposition
Abandon ship lifejackets not onboard 17&98 Distress flares
Distress flares as required not located on board 17&98 Fire fighting equipment and appliances
Fire bucket handle/lanyard not as required 17&98 Other (certificates)
No vessel certification available at time of inspection 17&98 Bilge pumping arrangements
Bilge pumps (including manual pump) and bilge alarms not operational 17&98 Other (machinery)
Electrical wiring not as required, loose cables and insecure connections 17&98 Other (machinery
Battery terminals not covered and corroded 17&98 Lights shapes sound signals
Navigation shapes not on board 17&98
Emergency lighting, batteries and switches
Emergency torch not working 17&98 Medical equipment, medical chest, medical guide
Medical kit (Cat C) out of date 17&98 Lifebuoys incl. provision and disposition
1 lifebuoy missing1 I lifeboat markings and reflective tape to renew and 18m line to be provided 17&98 Bulwarks and freeing ports
Stern bulwark insufficient height 17&98 Manholes and flush scuttles
Aft deck fuel filler access cover missing 17&98 Propulsion main engine
Main engine cooling system expansion cap missing 17&98 Navigation bridge visibility
Wheelhouse windows broken 17&98
1 Presumed to been lost at sea during the accident
Annex C MAIB safety flyer to the fishing industry
SAFETY FLYER TO THE FISHING INDUSTRY Fatal man overboard from the potting vessel Pioneer (NN200) south of Hastings, England, on 29 July 2021 Narrative At about 0853 on 29 July 2021, the skipper of the UK registered fishing vessel Pioneer fell overboard from the aft deck of the vessel. At the time of the accident, Pioneer was returning from its fishing grounds to its beach landing at Hastings in moderate sea conditions with a 2m swell. Pioneer’s sole deckhand was in the wheelhouse when they heard a shout; they immediately went out onto the deck and saw the skipper in the water some distance aft of the vessel. The skipper was not wearing a personal flotation device (PFD). The deckhand threw a life ring towards the skipper and saw him attempt to swim to it before returning to the wheelhouse and manoeuvring the vessel back towards the skipper. By this time the skipper was motionless with his face in the water. The deckhand tried in vain to manually haul the unconscious skipper back on board. The deckhand raised the alarm by making a “Mayday” call to the coastguard using a VHF radio, then made further unsuccessful attempts to help the skipper. Forty minutes later, with the help of a rescue helicopter winchman who had been lowered onto the vessel, the skipper was recovered on board and then airlifted to hospital, where he was later declared deceased. The investigation found that the bulwark around Pioneer’s aft deck was low and the vessel’s wheelhouse windows were semiopaque and cracked, restricting visibility from inside. Some items of mandatory safety equipment were missing, damaged or out of date, the Seafish risk assessment had not been completed, emergency drills had not been conducted and the skipper had not undertaken mandatory safety awareness training. Pioneer
Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an such investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This safety flyer is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2024 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. Safety lessons
- Make sure your vessel is well maintained and fit to go to sea. Check that your safety equipment
is in its correct position on board and in date for service.
- Risk assessments provide the opportunity to take stock of a fishing vessel’s normal working
activities, identify hazards and put in place measures to mitigate them. Had Pioneer had a guardrail of adequate height, or had the skipper been wearing a tethered safety harness in this case, either would have offered protection against the risk of falling overboard. Make sure you have attended the Seafish Safety Awareness course and refer to the Maritime and Coastguard Agency publication The Fishermen’s Safety Guide for advice on how to prepare risk assessments for your vessel.
- The wearing of a PFD while working on deck improves the likelihood of survival should the
unexpected happen and you fall overboard. PFDs are designed to keep you afloat with your airway clear of the water.
- Conduct frequent emergency safety drills, including man overboard recovery, and practice using
your safety equipment so you know what is available, how to operate it correctly, and whether it is adequate should a lone crew member be required to effect a recovery; do not wait until an accident happens to find out. This flyer and the MAIB’s investigation report are posted on our website: www.gov.uk/maib For all enquiries: Marine Accident Investigation Branch First Floor, Spring Place 105 Commercial Road Southampton SO15 1GH Email: maib@dft.gov.uk Tel: +44 (0)23 8039 5500 Publication date: December 2024
Marine Accident Report
FD06079 | 2025_英国_accident-to-chief-engineer-on-board-motor-yacht-baton-rouge-with-loss-of-1-life__2025-1-Ba.pdf
分类:06_境外及港澳台调查报告 | 年份:2025 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
VERY SERIOUS MARINE CASUALTY REPORT NO 1/2025 JANUARY 2025 1 This investigation was carried out by the UK Marine Accident Investigation Branch (MAIB) on behalf of the Isle of Man Administration in accordance with the Memorandum of Understanding between the MAIB and the Red Ensign Group Category 1 registries of Isle of Man, Cayman Islands, Bermuda and Gibraltar. Extract from The Isle of Man Merchant Shipping (Accident Reporting and Investigation) Regulations 2001 – Regulation 4: “The fundamental purpose of investigating a casualty, an accident, or an incident under these Regulations is to determine its circumstances and the causes with the aim of improving the safety of life at sea and the avoidance of accidents in the future. It is not the purpose to apportion liability, nor, except so far as is necessary to achieve the fundamental purpose, to apportion blame.” NOTE Under Section 4 of the Isle of Man Merchant Shipping Act 1985 a person is required to answer an Inspector’s questions truthfully. If the contents of this report were subsequently submitted as evidence in court proceedings then this would contradict the principle that a person cannot be required to give evidence against themselves. Therefore, the Isle of Man Ship Registry makes this report available to interested parties on the understanding that it shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2025 All reports can be found on our website: www.gov.uk/maib For all enquiries: Email: maib@dft.gov.uk Tel: +44 (0)23 8039 5500 ACCIDENT REPORT ACCIDENT REPORT Fatality of the chief engineer on board the motor yacht Baton Rouge at Falmouth Harbour, Antigua on 23 February 2024 BACKGROUND This investigation into a very serious marine casualty was conducted by the Marine Accident Investigation Branch on behalf of the Isle of Man Ship Registry, a member of the Red Ensign Group. SUMMARY On the morning of 23 February 2024, the chief engineer on the Isle of Man registered motor yacht Baton Rouge was electrocuted while working on the vessel’s engine room ventilation system. The chief engineer was replacing a damper actuator, which was situated in a ventilation overpressure duct compartment. Despite efforts to resuscitate him the chief engineer’s heart could not be restarted, and he was pronounced dead later that morning. The investigation found that the chief engineer commenced the actuator replacement without isolating the electric supply and without a permit to work for electrical maintenance in place. This was likely because he had rationalised the risk and wanted to avoid the limitations of restricting the vessel to emergency power. It was also found that the location of the overpressure duct compartment and the means of access to it met the definition of an enclosed space in industry guidance. However, the definition in the onboard safety management system was not aligned to this and instead focused on toxic atmospheres. As a result, the crew did not consider the overpressure duct compartment to be an enclosed space and did not follow enclosed space working and entry procedures. Since the accident the yacht’s manager, Nigel Burgess Limited, has updated its permit to work guidance for electrical systems; revised the enclosed space definition in the safety management systems of vessels under its management; and promulgated fleet guidance on the changes to the enclosed space definition, permits to work and the need for on board risk controls, training and drills. In view of the actions taken, no recommendations have been made in this report. Baton Rouge View towards the starboard side of a five-deck motor yacht while underway at sea. Image courtesy of Nigel Burgess Limited
2 FACTUAL INFORMATION Events before the accident At around 21001 on 22 February 2024, Baton Rouge lost electrical power. When the power had been restored, an engine room ventilation damper located in the starboard ventilation overpressure duct compartment (Figure 1) failed to reset and remained closed. The compartment containing the starboard ventilation overpressure duct was accessed via a bolted hatch cover in a storage locker on the bridge deck. At approximately 2200, the chief engineer (C/E), assisted by the second engineer (2/E), removed the bolted hatch cover (Figure 2) and the C/E entered the overpressure duct compartment to inspect the failed ventilation damper. No permit to work (PTW) was issued for this task. The C/E removed the failed actuating mechanism and opened the damper, leaving the actuating mechanism connected to the 230-volt alternating current (VAC) electrical power supply (Figure 3). The C/E then exited the overpressure duct compartment, leaving the hatch cover off to allow for airflow through the duct. The C/E and master discussed the repair and decided the work would be continued the following day. 1 All times used in this report are UTC-4 unless otherwise stated. Figure 1: Location of overpressure compartment on upper deck Profile general arrangement of the vessel’s starboard side overlaid with red vertical and horizontal lines denoting the various compartments on each deck. A person stands in the midships aft compartment of the upper deck. An illustrated yellow square border frames the person from their waist up and a label points to a shaded yellow rectangle above the top of line of this border, identifying it as an access hatch via the bridge deck located one deck above.Plan view of the upper deck. An illustrated yellow square border identifies the midships aft position of the overpressure compartment on the starboard side. Overpressure compartment Access hatch Images courtesy of Nigel Burgess Limited
3 Figure 2: Access to overpressure duct compartment View aft towards a locker in the vessel’s starboard bulwark. The access panel has been removed. An illustrated yellow border inside the exposed space indicates the position of the access hatch to the overpressure compartment. Locker A person kneeling next to a bolted access hatch cover in the base of the locker. Access hatch inside locker Figure 3: Removed damper actuator and junction box showing the wiring Close-up of a horizontally-mounted housing, showing the damper mechanism is missing from the top (right-hand side as fitted) of the housing. The base (left-hand side as fitted) is connected to power via three thick cables running up to an open junction box (top left) containing several thin electrical wires and connections. Junction box Damper actuator after removal Image courtesy of Nigel Burgess Limited
4 The accident At 0700 on 23 February 2024, the C/E and the master discussed the repair task. The ambient temperature inside the overpressure duct compartment was 50°C to 55°C so, to reduce the risk of heat exhaustion, the master and C/E agreed that the C/E would limit his time inside to 10 minutes followed by a period for rehydration. This was to be monitored by the chief officer (C/O) from the bridge deck. The C/E agreed to inform the C/O via ultrahigh frequency (UHF) radio each time he wished to enter the overpressure duct compartment. The master understood that the task could be completed with the vessel’s main generators running. No PTW was issued for entering the overpressure duct compartment or for disconnecting and replacing the electrical wiring for the actuator. Before starting work the C/E assigned several engine room-based tasks to the 2/E. These tasks did not include helping with the repair work, which the C/E had elected to complete without assistance. At 0723, the C/E went to the engine room to gather tools and replacement parts. At 0734, the C/E entered the overpressure duct compartment for the first time that day, having first informed the C/O via the UHF radio. Between 0734 and 0848, the C/E made three return trips from the overpressure duct compartment to the engine room for additional equipment. He informed the C/O via the UHF radio each time, and took rehydration breaks. For the first three entries the C/O remained on the bridge deck while the C/E was in the space, periodically checking on him. In between entries the C/O worked in their office. At some point after 0848, the C/E entered the overpressure duct compartment for a final time and continued the work with the actuator wiring on the open electrical junction box (Figure 4). Post-accident analysis of the closed-circuit television (CCTV) showed that he was visibly hot and sweaty as he approached the bridge deck. At 0856, a series of engine room ventilation system alarms were activated on the machinery monitoring system. The 2/E, who was completing tasks in the engine room, observed the alarms and ran to the overpressure duct compartment entrance to inform the C/E. When the 2/E arrived at the entrance they saw the C/E slumped over the ventilation trunking in the space. The 2/E shouted to the C/E but received no response so ran to the crew mess to raise the alarm. At 0858, the alarm was raised via the UHF radio and the C/O immediately ran from their office to the overpressure duct compartment and climbed down the ladder to reach the C/E. The C/O received an electric shock from the C/E when they touched him. Figure 4: Junction boxClose-up of the open junction box shows numerous electrical wires, individually coloured red, white, blue, and brown, that connect to plastic breakers. Image courtesy of Nigel Burgess Limited
5 The rescue On deck the crew responded to the emergency call and began preparations to rescue the C/E. In the overpressure duct compartment, the C/O assessed that the C/E had suffered a cardiac arrest and attempted to carry out cardiopulmonary resuscitation (CPR). The master alerted the marina harbour authorities to the situation via the bridge UHF radio. At 0902, Antigua and Barbuda Search and Rescue (ABSAR) was called. After several unsuccessful attempts to extract the C/E from the overpressure duct compartment, the crew of Baton Rouge eventually succeeded in removing him by using an endless sling around his chest and supporting his legs while hauling him from above. The C/E was laid on the bridge deck, where the crew continued CPR. At 0910, ABSAR paramedics arrived on Baton Rouge and took over the C/E’s care. At 0952, an ambulance arrived and transferred the C/E to a local hospital accompanied by the C/O. The C/E was declared deceased at 1019. Postmortem report The pathologist’s postmortem report noted that the C/E had a full thickness burn2 to his right hand and a second partial thickness burn3 on his left upper arm in the region of the elbow. The C/E’s cause of death was recorded as hypoxia4 with petechial haemorrhage5, and full and partial thickness burns. Post-accident actions and findings Following the accident the scene was photographed before the engine room ventilation system was restored. The images showed an open junction box with various wires disconnected from the terminal block (Figure 4). The 230VAC feed wire was completely removed from the junction box and was lying on the deck. The exposed live and neutral conductors were melted together and showed signs of burning (Figure 5). The replacement actuator mechanism had been fitted to the ventilation dampers but not connected to the electrical circuit. The electric circuit breaker for the power was in the on position. The electric circuit uninterruptible power supply (UPS) was subsequently found to be defective and replaced. On 24 February, a relief C/E arrived on board Baton Rouge. In discussion with the master and other stakeholders, the relief C/E decided to complete the task of replacing the failed actuator and connect it to the power supply. On 28 February, work started to complete the replacement of the ventilation damper. A PTW was issued for replacing the actuator mechanism and working on electrical equipment. The PTW stated that the overpressure duct compartment was not considered an enclosed space and that the primary hazards were high ambient temperature and compromised wiring circuits. Before isolating the electrical circuit in line with the PTW, the main generators were shutdown to prevent the diesel engines becoming starved of air when the ventilation dampers closed as electrical power was lost. 2 A severe burn injury, also known as a third-degree burn, where all three layers of skin, underlying fatty tissue, nerves and tendons are damaged. 3 A second-degree burn, also known as a deep dermal burn, where two layers of skin are damaged. 4 Lack of oxygen supply. 5 Ruptured tiny blood vessels (capillaries). Figure 5: Exposed live wires Close-up of exposed metal wires that are blackened and have fused together at the end of a piece of blue (neutral) wire and a piece of brown (live) wire.
6 The associated risks with completing the task were identified and mitigations were put in place. These included: • posting a sentry at the hatch entrance; • having rescue and medical kits to hand; • independent monitoring of the actions taken; and • an agreed rescue and action plan in case of unexpected events. The vessel Baton Rouge was an Isle of Man registered commercial yacht with capacity for 12 guests. It was certified under the Red Ensign Group Yacht Code Part A, January 2019 Edition. The vessel was crewed and managed by Nigel Burgess Limited (Burgess), which managed over 100 yachts globally. At the time of the accident Baton Rouge was berthed alongside at Falmouth Harbour marina, Antigua with 17 crew and no guests on board. Engine room ventilation system Baton Rouge’s engine room ventilation was provided by a forced supply and exhaust system that maintained a positive pressure within the engine room space. Excess pressure was vented into the ventilation overpressure duct compartments via pressure regulating valves. There were two duct compartments, one on each side of the engine room. The ventilation fans automatically adjusted the flow of air to counteract the effect of running machinery. The ventilation ducting was fitted with automatic dampers that closed in the event of an engine room fire. The dampers operated in fail-safe shut mode and would close in the event of a loss of power supply to the operating actuators. Electrical power had to be supplied to the damper actuators to maintain the dampers in the open position. The power to the circuit was supplied from the emergency generator switchboard. A UPS was fitted to the electric circuit to prevent the dampers closing in the event of a loss of power supply. The overpressure duct compartment was approximately 1.74m wide x 1.78m long x 2.12m high. The compartment’s bolted hatch cover was located inside a locker behind a bar (Figure 2) on the bridge deck. A vertical ladder led down to a platform in the compartment. The overpressure duct compartment contained ventilation trunkings, exhaust uptake pipe work and ventilation fans. The exhaust air from the engine room flowed through the duct and was vented to the atmosphere via a shipside louvre in the compartment. There was no fixed lighting in the duct compartment. Crew Baton Rouge’s crew held appropriate qualifications for their role and had completed familiarisation training that included knowledge of safe working practices. The C/E, Roy Temme, was 47 years old and was employed by Burgess Crew Services, a subsidiary of Burgess. He had served on Baton Rouge since June 2022 and had rejoined the vessel on 6 January 2024. He held an STCW6 III/2 Chief Engineer certificate of competency. On 8 March 2022, he had been issued with a medical certificate that stated he was medically fit and did not require any prescription medication. Onboard safety management Baton Rouge’s safety management system (SMS) included policy statements, personnel responsibilities, resources and procedures for shipboard operations and emergencies. The onboard documentation stated the purpose of risk assessments and provided guidance for their completion. The combined risk assessments and standard operational procedures (RASOP) included enclosed space entry and working on electrical equipment. The vessel’s SMS referenced the Maritime and Coastguard Agency 6 The International Convention on Standards of Training, Certification and Watchkeeping for Seafarers, 1978, as amended.
7 (MCA) Code of Safe Working Practices for Merchant Seafarers (COSWP) 2015 edition7, which had been recommended by the Isle of Man Ship Registry as a guide to safe working practices. The SMS required PTW to be issued for enclosed space entries and for electrical maintenance and repair, and they were to be authorised by either the C/O or C/E. The SMS risk assessment for the maintenance or repair of electrical equipment identified the hazard of injury due to electric shock and used a PTW to mitigate the risk. The risk assessment required that equipment was to be isolated and labelled as per tag out procedure. [sic] The associated PTW checklist stated that: Work on or near live equipment should be avoided if possible. When it is essential for the safety of the ship, or for testing purposes the precautions in COSWP 20.13.10 should be followed. The SMS document for enclosed space entry defined a dangerous (enclosed) space as: Any enclosed or confined space in which it is foreseeable that the atmosphere may at some stage contain toxic or flammable gases or vapours, or be deficient in oxygen, to the extent that it may endanger the life or health of any person entering that space. [sic] This definition was taken from Chapter 11 of the COSWP, Safe Movement On Board Ship. The document also detailed the procedures to be adopted when entering an enclosed space and referred to Chapter 15 of the COSWP, Entering Enclosed Spaces, and the MCA leaflet Enclosed Spaces – Guidance for merchant vessel operators8. The RASOP for enclosed space entry listed all the identified enclosed spaces on board Baton Rouge; the list did not include the overpressure duct compartments. The RASOP listed eleven hazards associated with enclosed space entry, including excessive heat and an unconscious person requiring rescue. Regulation and guidance On working on electrical equipment, section 20.13.1 of the COSWP referred to the risks of electric shock being much greater on ships than normally ashore because moisture, high humidity and high temperature (including sweating) reduce the contact resistance of the body and that, in those conditions, severe and even fatal shocks may be caused at voltages of 60V or lower. The COSWP stated that the energy source should be properly isolated before any electrical work was carried out and that additional precautions were required if work on live equipment could not be avoided for essential safety and testing purposes. These included: • having an electrically competent second person continually in attendance; • adopting a safe and secure working position; • wearing insulated gloves if practical; and • avoiding contact with the deck and other bare metal. The COSWP highlighted that hand-to-hand shocks were particularly dangerous and also recommended the use of a dry insulating mat at all times. 7 Amendment 7, October 2022. 8 Link via https://www.gov.uk/guidance/enclosed-spaces-on-sea-going-vessels
8 Both the MCA guidance leaflet and Chapter 15.1 of the COSWP defined an enclosed space as: …one that is not designed for continuous worker occupancy and has either or both of the following characteristics: • limited openings for entry and exit; • inadequate ventilation. Chapter 15 of the COSWP further referenced The Merchant Shipping and Fishing Vessels (Entry into Enclosed Spaces) Regulations 2022, which defined an enclosed space in the same way. The Chapter 15 definition also aligned with the definition in the Red Ensign Group Yacht Code Part A, Annex C, which referenced International Maritime Organization (IMO) Resolution A.1050(27) – Revised Recommendations for Entering Enclosed Spaces Aboard Ships. ANALYSIS The accident Baton Rouge’s C/E was electrocuted when he came into contact with a live electrical circuit while repairing a failed ventilation damper. His hot and sweaty condition provided good conductivity and the electricity likely passed through his heart, causing it to stop. Despite CPR efforts on board by the vessel’s crew and attending paramedics the C/E’s heart could not be restarted and he died from the resultant hypoxia. Actuator failure The UPS was designed to prevent the ventilation dampers closing during a loss of power. However, in this case the UPS failed to prevent the damper closing when the blackout occurred. When the power was restored, the failed actuator prevented the damper from opening, necessitating the replacement attempted by the C/E. The causes of the actuator and UPS failures could not be determined as both had been replaced following the accident and before the investigators were able to attend. Electrocution Working on live equipment presented a risk of electrocution that had been identified in the vessel’s SMS risk assessment, which stated that power supplies were to be isolated before starting electrical work. The C/E did not adopt any of the additional precautions detailed in the COSWP to cover the circumstances when work on live electrical equipment could not be avoided. It cannot be known why the C/E started work without isolating the electrical circuits or taking any of the additional COSWP precautions for working on live electrical equipment. It is possible that he was trying to save time and effort despite the risk. Isolating the damper actuator circuit involved shutting down the main generators and running on emergency power until the job was completed. This meant that hotel services and air conditioning systems could not operate while the repair was in progress. The desire to avoid shutting down the hotel services and ventilation, and that the voltage was only 230VAC, the same as UK domestic voltage, possibly led the C/E to rationalise the job as being low risk. There were no witnesses to how the C/E came to be slumped over the ventilation trunking in the overpressure duct compartment. However, his injuries were consistent with him coming into contact with 230VAC and the burns indicated the entry and exit points of the current as it flowed through his body to earth. The length of time that the C/E was in contact with the live supply can be estimated as a period of several minutes: from the point when the engine room ventilation alarms activated to the point when the C/O received an electric shock upon touching the C/E. Given the level of voltage and the time the C/E would have been in contact with it, this most likely caused the fatal cardiac arrest.
9 It cannot be known how the C/E initially touched the live conductors. It is possible that the C/E became disorientated or suffered a medical event while attempting to disconnect the wiring circuit in the high ambient temperatures. The last CCTV image of the C/E indicated that he was hot and sweaty, which likely improved the conductivity of the voltage flowing through his body to earth. Enclosed space working Baton Rouge’s SMS included a definition of an enclosed space from the COSWP Chapter 11 (Safe Movement On Board Ship) rather than from Chapter 15 (Enclosed Space Entry). The two definitions did not align and the definition in Chapter 11 was contrary to UK legislation and the IMO definition of an enclosed space. However, the hatch was accessed via a cramped locker and the overpressure duct compartment was not designed for continuous worker occupancy. These conditions clearly matched the enclosed space definitions in the COSWP Chapter 15 and the Red Ensign Group Yacht Code Part A. Additionally, a high ambient temperature inside the overpressure duct was a foreseeable identified hazard. The COSWP Chapter 11 enclosed space definition, and by extension Baton Rouge’s SMS, was written in a way that led the reader to understand that enclosed space procedures only applied to spaces with toxic or oxygen deficient atmospheres. The SMS therefore failed to describe an enclosed space as one with limited access and not normally designed for continuous occupation by a worker. The associated RASOP for enclosed space entry identified the enclosed spaces on board Baton Rouge, though the list did not include the overpressure duct compartments. This combined with the description of an enclosed space in the SMS probably led the crew to believe that enclosed space procedures could be disapplied. As the Chapter 11 definition reproduced in the SMS was heavily focused towards potentially dangerous atmospheres, it is possible that the crew believed the airflow through the duct space removed the need to treat it as an enclosed space. Consequently, additional precautionary measures such as posting a sentry at the entrance, a plan to rescue a person from the overpressure duct compartment, and other actions in line with RASOP were not implemented. The C/O monitored the C/E’s first three entries into the space but did not stay in continuous visual contact with him. Additionally, the monitoring arrangements relied on the C/E to inform the C/O that he wanted to enter the space and, as such, did not amount to a dedicated sentry controlling access to the space and directly monitoring the C/E. This meant that no immediate assistance, agreed rescue and action plan or equipment was available when the accident happened, which delayed the C/E’s recovery from the overpressure duct compartment. Permit to work The use of a PTW is an integral part of safety management and Baton Rouge’s SMS required one to be raised when conducting electrical maintenance and repair. The purpose of a PTW is to identify the major risks associated with a particular job or task and provide instructions on how those risks can be minimised. The process of putting a PTW in place acts as a natural pause before starting a job and helps to ensure hazards have been considered and mitigated in advance. The principal hazards associated with the planned work to replace the actuator were: the enclosed space, the electrical hazards, and the hot environment. Despite this there were no PTW in place for the work, and only the temperature had been recognised as a hazard and ad hoc mitigations put in place. Without any PTW there was neither a hazard identification checklist nor authorising officer to verify that all necessary precautions had been taken to mitigate risk or to ensure adherence with such measures. This meant that an opportunity was missed to make certain that the work could be completed safely. Neither the master nor the C/O, as PTW authorising officers, challenged the C/E’s decision to proceed without issuing any PTW. For the electrical systems work the master and the C/O might not have challenged the C/E simply because they deferred to him as the perceived authority on engineering matters. In the case of enclosed space entry, the master’s and C/O’s lack of challenge might have been because the SMS did not include the overpressure duct compartment on its list of enclosed spaces. The SMS defined an enclosed space as one having a toxic or oxygen deficient atmosphere and the crew
10 therefore reasoned that the overpressure duct compartment was not an enclosed space as there was a continuous flow of fresh air through it. As a result, a PTW was not issued and additional measures associated with enclosed space entry were not put in place. Without any PTW there was no assurance that the hazards involved in the work had been considered and the risk of injury to the C/E had not been fully mitigated. A fully operational ventilation system was critical to both the running and protection of machinery in the event of a fire in the engine room. It is possible that this consideration contributed to the urgency of completing the task and informed the actions of those involved. The subsequent repair The task to complete the fitting of the damper actuator was planned by the relief C/E and the associated hazards were identified. However, although many of the enclosed space hazard mitigation measures were put in place, the overpressure duct compartment was still not considered an enclosed space for the purpose of entry by the yacht’s crew. This indicated that the crew were relying strictly on the SMS definition of an enclosed space rather than considering reference documentation or assessing the space based on the hazards present. Although a PTW was issued and the risk mitigation measures were enacted and effective, it appears that the crew’s identification of an enclosed space was entirely based on compliance with the list of identified enclosed spaces on board Baton Rouge and the vessel’s SMS definition derived from the incorrect chapter of the COSWP. CONCLUSIONS • The C/E was electrocuted because he came into contact with live 230VAC conductors while working on the ventilation damper electric circuit. The reason why the C/E came into contact with the live conductors is unknown. • The PTW system was not used to identify the hazards associated with the repair task and put measures in place to mitigate them, meaning that the risk of injury to the C/E was not fully addressed before the work began. This was likely because the crew did not recognise the work area as an enclosed space and there was a lack of challenge from authorising officers. • The C/E had probably chosen to work on the live circuit to avoid the limitations of restricting the vessel to emergency power. In doing so it is possible that he rationalised that the level of risk from the non‑isolated circuit was small. • The C/E was a lone worker in the space. The monitoring arrangements in place did not amount to a dedicated sentry. No one observed the C/E’s final entry to the space, and immediate action could not be taken when he came into contact with the live conductors. • No rescue plan had been put in place to recover a person from the overpressure duct compartment. • The vessel’s SMS incorrectly defined criteria for an enclosed space based on Chapter 11 of the COSWP rather than Chapter 15. This contributed to Baton Rouge’s overpressure duct compartment not being considered an enclosed space by the vessel’s crew. • Chapters 11 and 15 of the COSWP contained different definitions for an enclosed space. The Chapter 11 definition focused on toxic atmospheres and was contrary to that in the underpinning UK Regulations, the Red Ensign Group Yacht Code Part A and the IMO Resolution.
11 ACTION TAKEN MAIB actions The MAIB has written to the MCA to highlight the contradiction between the enclosed space definitions within Chapters 11 and 15 of the COSWP, requesting that this discrepancy is reviewed during the next revision phase of the Code. Actions taken by other organisations Nigel Burgess Limited has: • Amended its PTW for electrical work to provide greater emphasis on: the elevated risk of electrical shock on board ships; the necessary precautions to be taken before working on electrical equipment; and the need to avoid working on live electrical systems wherever possible. • Updated its safety management manual to provide clearer qualification as to when a PTW is required. • Revised its company RASOP template to include the COSWP Chapter 15 definition of an enclosed space and to provide greater emphasis on the register of enclosed spaces. • Directed that RASOPs across the fleet are reviewed on board to ensure that the vessel’s register of enclosed spaces is correct, and instructed that these RASOPs are to be verified by the designated yacht manager. • Promulgated a circular to its fleet to draw attention to the changes to the safety management system specifying procedures for controlling hazards associated with enclosed spaces and the PTW updates. • Instructed Burgess internal auditors to commence a concentrated 2025 audit focus to confirm that the register of enclosed spaces reflects the COSWP Chapter 15 definition and that any entrance to an enclosed space is identified, marked, and controlled against unauthorised entry. RECOMMENDATIONS In view of the actions already taken, no recommendations have been made.
12 SHIP PARTICULARS Vessel’s name Baton Rouge Flag Isle of Man Classification society Lloyd’s Register IMO number 1010935 Type Motor yacht Registered owner Baton Rouge Yachting Ltd Manager Nigel Burgess Limited Year of build 2010 Construction Steel Length overall 62.0m Registered length 52.36m Gross tonnage 1,423 Minimum safe manning 7 Authorised cargo Not applicable VOYAGE PARTICULARS Port of departure Falmouth, Antigua Port of arrival Not applicable Type of voyage Not applicable Cargo information Not applicable Manning 17 Persons on board 17 MARINE CASUALTY INFORMATION Date and time 23 February 2024 at 0849 Type of marine casualty or incident Very Serious Marine Casualty Location of incident Starboard overpressure duct compartment Place on board Machinery space Injuries/fatalities One fatality Damage/environmental impact Nil Ship operation Alongside Voyage segment Alongside External & internal environment Air temperature 28°C; sunny; 53°C
FD06080 | 2025_英国_auxiliary-engine-room-fire-on-board-the-ro-ro-cargo-ship-finnmaster__2025-13-Finnmaster-Re.pdf
分类:06_境外及港澳台调查报告 | 年份:2025 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
ACCIDENT REPORT ACCIDENT REPORT Report on the investigation of the fire and subsequent loss of power on board the Finland registered roll-on/roll-off cargo ship Finnmaster at King George Dock, Hull, England on 19 September 2021 SERIOUS MARINE CASUALTY REPORT NO 13/2025 SEPTEMBER 2025
The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2025 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. All MAIB publications can be found on our website: www.gov.uk/maib For all enquiries: Marine Accident Investigation Branch First Floor, Spring Place 105 Commercial Road Southampton SO15 1GH United Kingdom Email: maib@dft.gov.uk Telephone: +44 (0)23 8039 5500 Press enquiries during office hours: +44 (0)19 3244 0015 Press enquiries out of hours: +44 (0)30 0777 7878
CONTENTS GLOSSARY OF ABBREVIATIONS AND ACRONYMS SYNOPSIS 1 SECTION 1 – FACTUAL INFORMATION 2 1.1 Particulars of Finnmaster and accident 2 1.2 Background 3 1.3 Narrative 3 1.4 Damage sustained 7 1.5 Environmental conditions 7 1.6 Finnmaster 8 1.6.1 Overview 8 1.6.2 Finnlines Plc 8 1.6.3 Crew 8 1.6.4 Cargo 9 1.6.5 Propulsion overview 9 1.6.6 Machinery space arrangement 9 1.6.7 Electrical systems 9 1.6.8 Communication systems 14 1.6.9 Planned maintenance system 14 1.6.10 Fire protection arrangements 15 1.7 Auxiliary engines 16 1.7.1 General 16 1.7.2 Operating parameters 17 1.7.3 Fuel system 17 1.7.4 Exhaust system 22 1.7.5 Alarm and monitoring system 24 1.7.6 AE2 major overhaul 28 1.7.7 Maintenance of AE2 fuel injection pump couplings 29 1.7.8 Flexible fuel hose routine inspection and replacement 31 1.7.9 Maintenance service providers 31 1.7.10 Machinery survey and inspection 32 1.7.11 Further regulation and guidance 36 1.7.12 Similar accidents involving machinery maintenance 39 1.8 Fixed carbon dioxide fire-extinguishing system 41 1.8.1 Description 41 1.8.2 System operation 43 1.8.3 Post-fire inspections 45 1.8.4 Onboard maintenance information 49 1.8.5 Service history 49 1.8.6 Flexible hose replacement 50 1.8.7 Flexible hose procurement and production 51 1.8.8 Flexible hose assembly delivery certification 51 1.8.9 Flexible hose assembly approvals 52 1.8.10 Flexible hose assembly production oversight 53 1.8.11 Service supplier approval 54 1.8.12 Viking Life-Saving Equipment Oy Finland 56 1.8.13 Finnlines service supplier audit programme 56 1.8.14 Installation survey and oversight 57 1.8.15 Further regulation and guidance 58 1.8.16 Similar accidents involving fixed carbon dioxide fire-extinguishing systems 59
- 9 Electrical system failure
60 1.9.1 Emergency power system failure 60 1.9.2 System loss due to power failure 60 1.9.3 EDG circuit breaker 60 1.9.4 EDG on board testing 62 1.9.5 Regulation and guidance 63 1.10 Emergency procedures 65 1.10.1 General 65 1.10.2 Muster list 65 1.10.3 Emergency response procedures 65 1.10.4 On board emergency training 66 1.10.5 Regulation and guidance 68 1.10.6 Similar accidents involving emergency response 70 SECTION 2 – ANALYSIS 72 2.1 Aim 72 2.2 Overview 72 2.3 Auxiliary engine 2 72 2.3.1 Partial failure of AE2 fuel injection pump drive coupling 72 2.3.2 Exhaust gas leakage 76 2.3.3 Use of service technicians 77 2.3.4 Oversight of the alarm and monitoring system modification 78 2.3.5 Failure of flexible fuel hose and ignition of fuel leakage 78 2.3.6 Surveys by classification societies 79 2.3.7 Surveys and inspections by Finnmaster's crew 80 2.3.8 Guidance on measures to prevent fires in machinery spaces 80 2.4 Fixed carbon dioxide fire-extinguishing system 81 2.4.1 System operation 81 2.4.2 System service 83 2.5 Electrical system failures 86 2.5.1 Loss of power 86 2.5.2 Circuit breaker failure 87 2.5.3 Power loss consequences 87 2.5.4 Emergency power supply testing 88 2.5.5 Emergency sources of power testing requirements 88 2.5.6 Fire party communication equipment standards 89 2.6 Emergency procedures 89 2.6.1 Safety management system 89 2.6.2 Command and control 89 2.6.3 Communication 89 2.6.4 Carbon dioxide system activation 90 2.6.5 Crew firefighting response 91 2.6.6 Crew emergency training 92 2.6.7 Summary 93 2.7 Fire extinction 93 SECTION 3 – CONCLUSIONS 94 3.1 Safety issues directly contributing to the accident that have been addressed or resulted in recommendations 94 3.2 Safety issues not directly contributing to the accident that have been addressed or resulted in recommendations 94
FIGURES Figure 1: Movements of Finnmaster within King George Dock Figure 2: Finnmaster general arrangement Figure 3: Damage to the auxiliary engine room Figure 4: Schematic of Finnmaster electrical distribution system Figure 5: Emergency diesel generator circuit breaker motor mechanism front panel Figure 6: Emergency diesel generator circuit breaker motor mechanism control circuit Figure 7: Auxiliary engine fuel system Figure 8: Fuel injection pump coupling Figure 9: Damaged coupling drive bolts Figure 10: Fuel injection pump coupling with failed bolt in situ Figure 11: Drive end laminated plate damage Figure 12: Witness marks on drive end coupling flange Figure 13: AE2 exhaust system Figure 14: AE2 exhaust insulation Figure 15: Gas scoring marks on turbocharger frame surface Figure 16: Turbocharger exhaust gas outlet transition ring Figure 17: Routing of flexible fuel hose from the inboard cartridge filters to the AE2 local instrument panel Figure 18: Use of insulation cement on the inboard turbocharger transition ring seal Figure 19: Finnmaster CO2 system schematic drawing Figure 20: Extract from CO2 system operating instructions posted in CO2 room Figure 21: Main fire locker CO2 release cabinets SECTION 4 – ACTION TAKEN 96 4.1 MAIB actions 96 4.2 Actions taken by other organisations 96 SECTION 5 – RECOMMENDATIONS 99
TABLES Table 1: PMS records of AE2 fuel injection pump couplings Table 2: Finnmaster crew fire drills completed between October 2020 and August 2021 Table 3: Effect of a cargo hold pilot hose assembly blockage on CO2 injection ANNEXES Annex A: United States Coast Guard Marine Safety Alert 06-17 Annex B: IMO Circular MSC.1/Circ.1318 – Guidelines for the Maintenance and Inspections of Fixed Carbon Dioxide Fire-extinguishing Systems Annex C: Geeve Hydraulics B.V. flexible hose assembly test certificate – July 2020 Annex D: DNV CO2 system flexible hose type approval certificate – issued December 2017 Annex E: Geeve Hydraulics B.V. flexible hose assembly test certificate – February 2021 Annex F: DNV CO2 system flexible hose type approval certificate – issued September 2020 Annex G: RINA CO2 system flexible hose type approval certificate – issued July 2015 Annex H: RINA CO2 system flexible hose type approval certificate – issued November 2020 Annex I: DNV approval of manufacturer certificate Annex J: Schneider Electric Fault Analysis Report reference RM22212514 Annex K: MAIB Safety Bulletin SB1/2022, issued 10 March 2022 Annex L: MAIB Safety Bulletin SB1/2023, issued 23 March 2023 Figure 22: Identified faults in CO2 pilot system serving Finnmaster's engine room Figure 23: Identified faults in CO2 pilot system serving Finnmaster's cargo holds Figure 24: Pilot flexible hose assembly radiographic images Figure 25: Section through flexible hose assembly coupling between cylinders C241 and C242 Figure 26: Damage to the EDG circuit breaker Figure 27: Displacement of fuel injection pump coupling due to partial failure Figure 28: AE2 exhaust gas leakage path
GLOSSARY OF ABBREVIATIONS AND ACRONYMS °
angular degrees °C
degrees Celsius 1/E
first engineer 2/E
second engineer 2/O
second officer AE1
auxiliary engine 1 AE2
auxiliary engine 2 AER
auxiliary engine room BDC
bottom dead centre C/E
chief engineer CABA
compressed air breathing apparatus cm
centimetre CMS
Continuous Machinery Survey CO2
carbon dioxide CO2 system
fixed carbon dioxide fire-extinguishing system DNV
Det Norske Veritas Group AS ECDIS
Electronic Chart Display and Information System ECR
engine control room EDG
emergency diesel generator Geeve
Geeve Hydraulics B.V. GMDSS
Global Maritime Distress and Safety System HSR
HSR Hydraulics BV IACS
International Association of Classification Societies IMO
International Maritime Organization Inter Marine
Inter Marine Oy ISM Code
International Safety Management Code for the Safe Operation of Ships and for Pollution Prevention ISO
International Organization for Standardization kg
kilogram kW
kilowatt m
metre m3
cubic metre
MCA
Maritime and Coastguard Agency MGN
Marine Guidance Note MGO
marine gas oil MHI
Mitsubishi Heavy Industries mm
millimetre MoU
memorandum of understanding MPMS
machinery planned maintenance system MSA
Marine Safety Agency MTEE
Mitsubishi Turbocharger and Engine Europe B.V. OEM
original equipment manufacturer Parker
Parker Hannifin Manufacturing S.r.l PMS
planned maintenance system RINA
RINA S.p.A RO
Recognised Organisation ro-ro
roll on/roll off SD
circuit breaker trip contact SEC
safety equipment certificate SIAF
Safety Investigation Authority, Finland SMS
safety management system SOLAS
The International Convention for the Safety of Life at Sea, 1974, as amended STCW
International Convention on Standards of Training, Certification and Watchkeeping for Seafarers, 1978, as amended TDC
top dead centre TRAFICOM
Finnish Transport and Communications Agency UHF
ultrahigh frequency UMS
unattended machinery space UPS
uninterruptible power supply UR-Z17
Unified Requirement Z17: Procedural requirements for service suppliers USCG
United States Coast Guard UTC
universal time coordinated UVT
undervoltage time delay unit
VAC
volt alternating current VDC
volt direct current VHF
very high frequency Viking
Viking Life-Saving Equipment Oy Finland Viking LSE
Viking Life-Saving Equipment B.V., Netherlands TIMES: all times used in this report are UTC +1 unless otherwise stated.
Finnmaster View from across water towards the port bow of the ro-ro cargo ship Finnmaster as it berths starboard side to quay in a container port.
1 SYNOPSIS At 2013 on 19 September 2021, a fire broke out in the auxiliary engine room on the Finland registered roll-on/roll-off cargo ship Finnmaster during departure from Hull, England. Finnmaster lost power, but the fire was later extinguished and the vessel safely re-berthed with the assistance of tugs. The auxiliary engine room was significantly damaged but there were no injuries. The investigation found that:
●The fire started after mechanical failures on one of the auxiliary engines caused hot exhaust gases to impinge on a flexible hose that failed, leaking fuel under pressure onto a hot component in the exhaust system where it ignited.
●The flexible hose installed in the fuel system during a modification did not meet the required standard, was fitted in an inappropriate position, and had not been subject to approval or oversight by the responsible classification society.
●A fault in Finnmaster’s emergency generator circuit breaker prevented the generator from supplying power to the emergency systems on board.
●The fixed carbon dioxide fire-extinguishing system was activated by the crew, but failed to fully operate due to a defective flexible hose assembly and leaks in the pilot system.
●The crew’s response to the fire did not follow accepted procedures for the release of carbon dioxide into the engine room. Recommendations have been made to:
●The Finnish Transport and Communications Agency to update its guidance to industry on machinery space fire prevention and propose that the International Maritime Organization develop functional requirements for communication systems as well as guidance on the testing of fixed fire-extinguishing systems and emergency power supplies.
●Finnlines Plc to provide guidance on the identification and reporting of machinery failure trends, and to update the onboard response and training procedures.
●RINA S.p.A to propose guidance to the International Association of Classification Societies to improve the surveys conducted by chief engineers, and a revision of Unified Requirement Z17 on the approval of service providers.
2 SECTION 1 – FACTUAL INFORMATION 1.1 PARTICULARS OF FINNMASTER AND ACCIDENT SHIP PARTICULARS Vessel’s name Finnmaster Flag Finland Classification society RINA S.p.A IMO number/fishing numbers 9132014 Type Roll-on/roll-off cargo ship Registered owner Finnlines Plc Manager(s) Finnlines Plc Construction Steel Year of build 1998 Length overall 154.50m Registered length 145.87m Gross tonnage 12,433 Minimum safe manning 11 Authorised cargo Freight vehicles, containers VOYAGE PARTICULARS Port of departure Hull, England Port of arrival Helsinki, Finland (Intended) Type of voyage International trade Cargo information Freight vehicles, containers Manning 16 MARINE CASUALTY INFORMATION Date and time 19 September 2021 at 2013 Type of marine casualty or incident Serious Marine Casualty Location of incident Hull, England Place on board Auxiliary engine room Injuries/fatalities None Damage/environmental impact Significant fire damage to a compartment Ship operation Manoeuvring Voyage segment Departure External & internal environment Still water; light easterly breeze; darkness; good visibility; air temperature 16°C Persons on board 16 crew, 1 passenger
3 1.2 BACKGROUND Finnmaster was owned and operated by Finnlines Plc (Finnlines) and carried both roll-on/roll-off (ro-ro) cargo and containerised freight between Hull, England and Helsinki, Finland. The ship departed Hull each Sunday evening for an afternoon arrival in Helsinki on the following Wednesday. Finnmaster sailed from Helsinki each Thursday afternoon to arrive back in Hull early on Sunday morning. 1.3 NARRATIVE On the evening of 19 September 2021, Finnmaster’s crew completed loading cargo and prepared to leave 9 Quay in Queen Elizabeth Dock, Hull bound for Helsinki. The departure was originally scheduled for 19301 but was delayed by 30 minutes due to the scheduling of ship movements in the port. At 1920, the first engineer (1/E) started auxiliary engine (AE) number one (AE1) and paralleled2 it with the running auxiliary engine number two (AE2), which had been supplying the full ship’s load since 0755 that morning. Once AE1 was connected to the switchboard, the 1/E performed a routine visual check of the two running engines in the auxiliary engine room (AER). At 1930, the 1/E was joined in the engine control room (ECR) by the chief engineer (C/E). At 2005, Finnmaster departed the berth using both the main engine and bow thruster. There was a pilot on board. The ship manoeuvred stern-first into the basin of King George Dock in preparation to transit the King George Lock into the Humber Estuary (Figure 1). At 2013, the fire detection system alarmed, indicating that smoke had been detected in the AER (Figure 2). The fire alarm automatically sounded throughout the ship. The 1/E went to the AER and saw smoke coming from the aft end of AE2. Approaching the instrument panel in between the two alternators, the 1/E saw that the two exhaust gas temperature gauges for AE2 each read more than 650°C, which was the highest recordable temperature on the scale. A fire ignited below AE2’s outboard turbocharger shortly afterwards, next to where the 1/E was standing. The 1/E immediately returned to the ECR and reported the fire to the C/E. The 1/E then collected a 6kg carbon dioxide (CO2) fire extinguisher and returned to fight the developing fire on AE2. The C/E called the bridge by telephone to brief the master about the fire and then stopped the bow thruster. When the fire alarm sounded some of the crew remained at their operational stations on the forward and aft mooring decks. The other crew members went to their emergency muster stations. The second engineer (2/E) was woken in their cabin by the fire alarm and dressed and went to the ECR, where the C/E briefed them about the fire. Leaving the 2/E in the ECR, the C/E went to retrieve a 50kg dry powder3 fire extinguisher from the boiler room. 1 All times in this report are local time – British Summer Time (UTC+1). Finnmaster operated on Eastern European Time (UTC+3). 2 The process of connecting the alternators to operate as one unit that requires the waveforms of the electricity generated to be aligned before the circuit breaker is closed. 3 Dry powder extinguishers use a fine monoammonium phosphate powder to chemically interrupt the reaction of fire and are suitable for use on solid, liquid and gaseous fires. They do not have a cooling effect.
4 Having unsuccessfully attempted to fight the fire, the 1/E returned to the ECR and instructed the 2/E to stop AE2. The 1/E then went to help the C/E carry the dry powder fire extinguisher up the single flight of stairs to the AER. The 2/E switched AE2 into manual control on the alternator engine control panel in the ECR and stopped the engine. The circuit breaker connecting AE2 to the main switchboard opened automatically, immediately transferring all electrical load to AE1. The C/E and 1/E entered the AER with the dry powder fire extinguisher, but the intensity of the heat from the fire forced them to withdraw from the compartment before they could use it. The two engineers closed the door to the AER and returned to the ECR. As the emergency in the engine room was developing, Finnmaster continued moving slowly astern. The master moved the propeller pitch control on the bridge slightly ahead to arrest the ship’s astern movement. The master, pilot, and shore-based dock control officer discussed options for berthing the ship within King George Dock and started to mobilise tug assistance from the port. At 2017, AE1 stopped and Finnmaster lost all main electrical power and propulsion. The ship then drifted in the basin of King George Dock with its momentum swinging its bow slowly to starboard. The emergency diesel generator (EDG) started automatically on the loss of power but did not connect to supply power to the emergency switchboard. The C/E instructed the 2/E to go to the emergency generator room on the weather deck (Figure 2) to investigate. Reproduced from Admiralty Chart 3496-1 by permission of HMSO and the UK Hydrographic Office Nautical chart overlaid with illustrated ship outlines, each labelled with a time, showing the vessel’s astern sequence from its berth into the dock’s basin. Finnmaster moves ahead when its bow faces the lock entrance, the sequence showing the vessel gradually swinging to starboard before coming port side to the quay west of the lock. Figure 1: Movements of Finnmaster within King George Dock Time: 2005 Time: 2010 Time: 2013 Time: 2015 Time: 2019 Time: 2024 Time: 2045 Time: 2057 Finnlines terminal Lock to Humber Estuary
5 First schematic is a profile general arrangement view of Finnmaster’s starboard side.
Second schematic is a plan view of the weather deck overlaid with labels pointing to the port bow location of the main fire locker and the port stern location of the emergency diesel generator room.
Third schematic is a plan view of the upper cargo hold overlaid with labels pointing to the respective locations of the CO2 room at the starboard bow, and the auxiliary engine room and port and starboard ramps at the stern.
Final schematic is a plan view of the lower cargo hold overlaid with a label pointing to the ECR’s location beneath the auxiliary engine room. Base images courtesy of Birka Cargo The longitudinal parallel positions of AE1 and AE2 in the auxiliary engine room. AE1 AE2 Stern ramps Emergency diesel generator room CO2 room Main fire locker WEATHER DECK UPPER CARGO HOLD LOWER CARGO HOLD ECR Auxiliary engine room Figure 2: Finnmaster general arrangement
6 The C/E and 1/E collaboratively decided that the fixed CO2 fire-extinguishing system (the CO2 system) needed to be used to extinguish the fire. The C/E and 1/E initially intended to activate the system from the CO2 room at the forward end of the main deck. Having started to make their way there by torchlight, they decided instead to go to the main fire locker at the forward end of the weather deck, where the remote control station for the CO2 system was located. The C/E sent the 1/E to request permission from the master to activate the CO2 system. The ultrahigh frequency (UHF) handheld radio system having failed, the master attempted to use the sound-powered telephone to the ECR but received no response. The master instructed the second officer (2/O) to take a handheld very high frequency (VHF) radio to the ECR to attempt to establish communication with the C/E. This coincided with the 1/E’s arrival on the bridge. The master gave permission for the release of CO2 into the engine room and recalled the departing 2/O. On arrival at the emergency generator room the 2/E found that the EDG was running but its circuit breaker had not closed to connect the generator to the emergency switchboard. The 2/E tried to close the circuit breaker manually by using the push button on its front panel, but it did not operate. The EDG cooling water temperature was high and the cooling fan was not operating so the 2/E stopped the engine manually and left to inform the C/E of the problem with the circuit breaker. The 1/E met the C/E at the main fire locker and reported that the master had authorised the activation of the CO2 system. At 2021, the C/E activated the system to release CO2 into the engine room. Under instruction from the 1/E the available fire team members started to prepare their equipment. The C/E instructed the newly arrived 2/E to go to the CO2 room to check the fixed fire-extinguishing system. The 2/E entered the compartment and identified by torchlight that not all of the CO2 gas cylinders allocated to the engine room had operated. The 2/E returned to the main fire locker and informed the C/E, then returned to the emergency generator room with the electrician to try to restore power to the emergency switchboard. Finnmaster continued to drift slowly past the west knuckle at the entrance to King George Lock. At 2026, the tug Serviceman arrived and was made fast by Finnmaster’s crew who passed the lines manually as the ship’s winches had no power. At 2037, the arrival of the second tug, Nobleman, enabled Finnmaster to be brought fully under control. The 1/E led Finnmaster’s fire team to the main cargo hold via the aft crew stairway. At 2040, two fire team members entered the AER wearing compressed air breathing apparatus (CABA). The fire team withdrew from the space and reported the remnants of a small fire on AE2. They re-entered the space and extinguished the fire with a dry powder extinguisher. At 2057, Serviceman and Nobleman manoeuvred Finnmaster alongside the quay to the west of King George Lock. By 2117, the ship was secured alongside. Humberside Fire and Rescue Service firefighters boarded Finnmaster and confirmed that the fire had been extinguished. Finnmaster’s crew installed a temporary arrangement to bypass the faulty EDG circuit breaker and restored power to the emergency switchboard at 0233 on 20 September 2021.
7 1.4 DAMAGE SUSTAINED Finnmaster sustained fire damage to the equipment in the AER (Figure 3). The heat generated during the fire was sufficient for plastic components to melt, causing damage to electrical wiring and other susceptible equipment. Smoke damage was largely limited to the interior of the compartment. The fire significantly affected the area of the AE instrument panels. The pressure gauge indicating the fuel supply pressure to the outboard fuel injection pump on AE2 had seized, showing 3.8 bar after the fire. The inboard fuel injection pump coupling bolts on AE2 had failed and jammed in the coupling. The fuel injection timing on the cylinders that side of the engine had changed. The terminal box containing the wiring for the instrumentation on both AE1 and AE2 was positioned on the frame of the instrument panel for AE1. The door of the terminal box had failed, causing the internal wiring to melt due to its exposure to the heat of the fire. The external alternator output, exciter and monitoring cables serving both AEs were heat-damaged. Both AE1 and AE2 sustained significant damage, necessitating their later removal from the ship for repair. 1.5 ENVIRONMENTAL CONDITIONS At the time of the accident, the air temperature was 16°C with light airs from the east. Sunset had occurred at 1907 and it was dark, though the dock was well- illuminated by lights on the surrounding berths. The King George Lock outer gates, which provided access to the Humber Estuary, were closed and there were no currents or tidal flows within the basin. Figure 3: Damage to the auxiliary engine roomClose-up of AE2’s smoke and fire-damaged instrument panel with the engine’s exhaust pipe in the background. View aft between AE2 on the left-hand side and AE1 on the right-hand side shows smoke and fire-damaged plastic components, including a melted fluorescent light. Melted fluorescent light AE2 AE1 AE2 instrument panel
8 1.6 FINNMASTER 1.6.1 Overview Finnmaster was a Finland registered combination container and ro-ro cargo ship built in Norway in 1998. Finnmaster’s upper cargo hold on the main deck and lower cargo hold on the platform deck were used to carry vehicles. The ship’s open weather deck was used for both vehicles and containerised cargo and was accessed via a fixed ramp on the port side (see Figure 2). Finnmaster had been classified by the Det Norske Veritas Group AS (DNV) from its construction until 1 January 2016, when the ship’s management changed to Finnlines Plc (Finnlines) and classification transferred to RINA S.p.A (RINA) at the request of the owners. 1.6.2 Finnlines Plc Finnlines was a Finnish public limited company and one of seven independent shipping companies wholly owned by the Grimaldi Group headquartered in Italy. Finnlines operated a fleet of 21 ships, including cargo and passenger ro-ro ships. The company had three ro-ro cargo and two ro-ro passenger ships under construction as part of a newbuilding programme. The fleet’s operational and technical management was based in Helsinki. Finnlines held a Document of Compliance4 issued by the Finnish Transport and Communications Agency (TRAFICOM), certifying the company for the operation of both cargo ships and ro-ro passenger ships. Finnlines’ operations centred on trading routes in north-west Europe and Scandinavia. 1.6.3 Crew TRAFICOM issued a minimum safe manning document5 to Finnmaster requiring a minimum of 11 crew to operate the ship. At this level of manning, Finnmaster was certified to operate with an unattended machinery space (UMS)6. On 19 September 2021, there were 16 crew on board Finnmaster and all were qualified in line with the requirements of the minimum safe manning document. The crew comprised Finnish, Estonian, Latvian and Filipino nationals. The working language on board Finnmaster was English. Finnmaster’s deck department operated a three-watch system while at sea, but all deck crew were needed for mooring operations. The engine room operated in UMS mode but was manned by the C/E and a duty engineer officer for port arrivals and departures. On the day of the fire the 1/E was the duty engineer officer. 4 A safety certificate issued to shipping companies in line with the requirements of SOLAS Chapter IX to certify compliance with the ISM Code. 5 A certificate detailing the number of qualified and experienced seafarers necessary to operate the ship safely. 6 Essential requirements included the provision of an approved alarm and monitoring system that maintained the ship’s safety to a standard equivalent to that of an operator being present.
9 1.6.4 Cargo On 19 September 2021, Finnmaster loaded 102 wheeled freight units into its lower and upper cargo holds. A further three wheeled freight units and 51 containers were loaded onto the weather deck. The loaded cargo included various dangerous goods that had been stowed in line with the requirements of the International Maritime Dangerous Goods Code. 1.6.5 Propulsion overview Finnmaster’s single main engine provided 15.6 megawatts of propulsion power through a reduction gearbox to a constant speed single shaft driving a controllable pitch propeller. The ship had a single rudder and was equipped with an 800 kilowatt (kW) bow thruster used for manoeuvring at low speed. 1.6.6 Machinery space arrangement The engine room was located in the aft section of Finnmaster’s platform deck, below the main deck. The ECR was located across the port side of the engine room’s forward bulkhead, which separated the space from the lower cargo hold. Immediately aft of the ECR on the port side was a staircase leading up to two doors on the main deck: an inboard door led to a stairwell giving access up to the weather deck and, through a further door, into the main cargo hold; the outboard door at the top of the stairs led into the AER containing the two AEs and their ancillary equipment (see Figure 2). 1.6.7 Electrical systems Main power supply Electrical power at 380 volt alternating current (VAC) and 50 hertz was provided by three alternators connected to the main switchboard (Figure 4). Alternators AE1 and AE2 were each rated at 850kW. The third (shaft) alternator was driven by a power take-off from the propulsion engine gearbox and was rated 1,000kW. This alternator could be connected either to the main switchboard or directly to the bow thruster. The main switchboard in the ECR contained individual starter boxes for the ship’s equipment and also supplied power to distribution switchboards elsewhere on board. A bus-tie breaker7 electrically divided the main switchboard into two, enabling each side to be operated independently. Finnmaster normally operated with the bus-tie breaker closed. The circuit breakers connecting the alternators to the main switchboard were designed to open automatically should electrical parameters vary from safe limits8. Finnmaster was provided with a power management system that regulated the sharing of electrical load between the alternators. Either AE1 or AE2 would be designated the ‘lead alternator’ and the other the ‘follower’. The power management system would automatically start and stop the follower unit and share the load between the alternators as necessary dependent on the electrical demand on board. 7 A circuit breaker connecting two parts of the switchboard. 8 Low frequency, low voltage, short circuit current, overcurrent, reverse power or current differential.
10 Each of the three alternators on Finnmaster had sufficient electrical capacity to power the ship in normal operation. More than one alternator would be used when higher load necessitated, for example during the carriage of refrigerated cargo units. When entering or leaving port, Finnmaster would operate with two alternators connected to provide security of supply. If the bow thruster was required during periods of high electrical load it would be connected directly to the shaft alternator, with the two main alternators connected in parallel supplying power to the main switchboard consumers. Lower voltage main power at 220VAC was provided by step-down transformers connected to the main switchboard. On the day of the fire Finnmaster‘s electrical system was configured with AE1 and AE2 supplying the full ship’s load for departure from Hull. AE2 was set as the lead alternator. The shaft alternator was not connected. Emergency power supply The equipment requiring an emergency power supply on Finnmaster was connected to an emergency switchboard. In normal operation, the emergency switchboard was supplied through an interconnector circuit breaker on the main switchboard and an interconnector contactor on the emergency switchboard (Figure 4). A step-down transformer supplied from the emergency switchboard provided 220VAC power to lower voltage critical equipment such as emergency lighting. The EDG supplied Finnmaster’s emergency power. The EDG was a diesel engine-driven generator located with the emergency switchboard in the emergency generator room (see Figure 2). The EDG was required to automatically start and connect to the emergency switchboard within 45 seconds following a loss of power. Figure 4: Schematic of Finnmaster electrical distribution system S c h ematic diagram depicts the main switchboard as two rectangles separated by a bus-tie breaker. The AE1 and shaft alternators connect directly to the left-hand rectangle and the AE2 connects directly to the right-hand rectangle. Direct connection is also available between the shaft alternator and the bow thruster. All direct connections to the main switchboard are fitted with a circuit breaker. The emergency diesel generator connects directly to the emergency switchboard. Two sets of dashed lines represent the interdependent control circuits between the main and emergency switchboards and the bow thruster and shaft alternator circuits to the main switchboard. Emergency switchboard Emergency diesel generator AE1 (850kW) AE2 (850kW) Bow thruster Shaft alternator (1,000kW) Contactor Circuit breaker Interdependent control circuit Interconnector circuit breaker Main switchboard interconnector contactor Bus-tie breaker For illustrative purposes only: not to scale Main switchboard
11 The EDG supplied power to the emergency switchboard through a circuit breaker and was rated at 156kW. It was not possible to operate the EDG in parallel with the main switchboard. The diesel engine powering the EDG was water cooled. The water circulated through a radiator provided with a fan powered from the emergency switchboard. When the EDG started, and power was available on the emergency switchboard, the fan would start automatically and ventilation dampers on the radiator outlet would open automatically to provide a cooling airflow through the radiator. An uninterruptible power supply (UPS), provided by 24 volt direct current (VDC) batteries, supplied power to instrumentation and some of the ship’s communication systems. Emergency diesel generator circuit breaker The circuit breaker between the EDG and the emergency switchboard9 comprised two main components: the circuit breaker switch, a mechanical device that physically connected the two sides of the circuit together when made; and the motor mechanism module (motor module), which allowed the switch to be operated electrically. The motor module contained a small electric motor that moved a mechanism to operate the mechanical switch. The serial numbers indicated that both the switch and motor module were produced in the late 1990s, coincident with the construction of Finnmaster. The circuit breaker motor module allowed either automatic or manual operation of the EDG circuit breaker using a circuit breaker mode selector on the front of the motor module cover. In manual mode it was possible to compress a charging spring in the motor module using a ratchet lever and then open or close the circuit breaker using push buttons on the front of the unit. During the emergency on Finnmaster the mode selector switch was set to automatic. In later attempts to close the circuit breaker, the crew set the mode selector switch to manual (Figure 5). In automatic mode, the motor module charging spring was compressed by the action of a 220VAC motor acting through a gear mechanism in the unit. The design criteria for the charging motor limited its operation to a maximum of four operations per minute. The EDG circuit breaker motor module control circuit diagram is shown in Figure 6. An undervoltage time delay unit (UVT) was installed to delay the opening of the circuit breaker10 and prevent nuisance tripping in the event of a transient voltage drop. A loss of power to the undervoltage trip contacts on the motor module would cause the circuit breaker to open. An auxiliary relay (16K5) was connected in parallel with the UVT’s input terminals11. When this relay was energised, and if the motor module was set to automatic operation, the motor rearming connection started the control unit motor and compressed the motor module charging spring. 9 An MT400 motor mechanism module attached to a ComPacT NS400NA 3-pole switch, both manufactured by Schneider Electric. 10 The time delay was set to 500 milliseconds. 11 Time delay terminals 1 and 2 in Figure 6.
12Two indicators at the centre of the panel show the circuit breaker is in the green ‘off’ position and the spring status is in the white ‘discharged’ position. Beneath these, from right to left, is a mode selector switch in the manual position, a large red square ‘push OFF’ button and a large black square ‘push ON’ button. A recessed vertical manual spring charging handle is housed down the panel’s right-hand side. Figure 5: Emergency diesel generator circuit breaker motor mechanism front panel Circuit breaker position indicator Spring status indicator Manual spring charging handle Mode selector switch Circuit breaker close and open buttons
13 Figure 6: Emergency diesel generator circuit breaker motor mechanism control circuit Generator guard contact Time delay (UVT) 1 A2 A4 A1 Motor module Undervoltage trip contacts Breaker IN Breaker OUT Motor B2 B4 Trip contact (SD) 16K5 OUT Breaker OUT signal Breaker OUT signal Breaker contact EDG voltage Diesel running Manual Auto IN D1 D4 2 3 4 16K5 220VAC 220VAC For illustrative purposes only: not to scale Contact Push button
14 1.6.8 Communication systems General Finnmaster had an independent sound-powered telephone system with handsets on the bridge and in the ECR, CO2 room and emergency generator room, among other main control stations. There was no handset in the main fire station from where the CO2 system was activated. The communication systems on board Finnmaster had been subject to inspection during the periodic survey for the safety equipment certificate (SEC), carried out in July 2021. Very high frequency communication system The main VHF radio installation on Finnmaster formed part of the Global Maritime Distress and Safety System (GMDSS)12. The system was powered from the emergency switchboard, backed up by 24VDC batteries provided expressly for a situation where both main and emergency sources of power to the radios were unavailable. The GMDSS system remained operational throughout the incident. Finnmaster was also equipped with three handheld VHF battery-powered radios intended for use in survival craft. Ultrahigh frequency communication system A UHF radio system provided the means for Finnmaster’s crew to communicate with each other. The system comprised individual handheld transceivers and an analogue repeater unit, which boosted the signal to overcome communication issues in areas where the ship’s structure interfered with the radio signals. The carriage of a UHF repeater system was not a mandatory requirement. The system was powered from the bridge 220VAC distribution board supplied from the emergency switchboard. It was not connected to a UPS. 1.6.9 Planned maintenance system Finnmaster’s machinery maintenance was managed using a planned maintenance system (PMS) and scheduled in line with manufacturer recommendations based on machinery running hours or calendar frequency. The PMS was approved by DNV, the ship’s original classification society. In 2004, DNV conducted a survey of Finnmaster’s PMS to confirm that the system met the requirement for safe and reliable operations. The surveyor recorded that: some changes had been made based on the owner’s and/or ship’s experiense due to traffic pattern. All changes had been agreed with the owner’s superintendent. [sic] The same PMS continued to be used on board Finnmaster after the ship’s classification transferred to RINA in January 2016. Finnlines maintained a list of critical equipment in the PMS that included the EDG and emergency switchboard but none of the radio installations nor the UHF analogue repeater unit. 12 A worldwide integrated communication system used to transmit emergency and distress messages.
15 The responsibility for maintenance of machinery was delegated to individual engineering officers. The assigned engineer monitored the condition of the equipment they were responsible for and completed maintenance in line with the instructions contained in the PMS. The 2/E was assigned the majority of the AE maintenance tasks; electrical tasks were carried out by the electrician. The C/E carried out surveys of machinery and maintained oversight of the records that the engineering officers entered into the PMS. When personnel changed, an overview of the maintenance carried out during the duty period was passed to the joining engineer in a set of handover notes. The C/E was provided with a copy of these notes. 1.6.10 Fire protection arrangements Firefighting equipment Finnmaster had portable foam, dry powder and CO2 fire extinguishers located around the ship for the extinguishing of small fires. A distributed network of fire hydrants connected to a fire main provided access to seawater for fighting fires using fire hoses. The fire main was supplied by three fire pumps driven by electric motors, one of which was situated in the forward pump room and supplied with power from the emergency switchboard. The other two pumps were supplied with power from the main switchboard and were situated in the main engine room. Finnmaster had a CO2 system capable of being activated from the main fire locker on the weather deck. The system could inject a set quantity of CO2 into the engine room or either cargo hold to extinguish a fire. Engine room ventilation Ventilation for the AER was provided from the main engine room supply fans positioned forward of the funnel on the first bridge deck. Air from the main engine room supply fans entered the AER through a set of fixed louvres on the inboard side of the compartment. Air flowed out of the AER through permanent openings into the main engine room from where it passed up the engine casing, exhausting through louvres on the rear of the funnel. There were no exhaust fans. The inlets to the engine room supply fans were fitted with automatic fire dampers that would close if the fans were stopped or there was a loss of power to the fire damper actuators. The engine room supply fans could be stopped locally at the fan or from control panels in the ECR and on the bridge. The fans would also stop automatically, and the automatic fire dampers would close, if the control cabinet for the engine room CO2 system was opened. The supply dampers had automatically closed when power was lost during the fire. The fire dampers on the exhaust from the engine room were manually operated shutters on the inside of the funnel louvres. These shutters were actuated using handles at deck level on the aft bulkhead of the funnel. The exhaust fire dampers were in working order, though the labels for the exhaust damper actuator handles were obscured by paint.
16 The exhaust dampers were open when inspected as part of the investigation. Crew members were unaware of the operation of the exhaust fire dampers, believing that they were not present at all, or that all fire dampers were automatic and closed on a loss of power. Fuel system emergency shutdowns The fuel valves from the service tank supplying marine gas oil (MGO) to Finnmaster’s main engine and AEs, as well as those supplying the boiler, separators and fuel transfer pumps, could all be remotely closed from the emergency generator room. The outlet valve from the service tank to the AE fuel system was not closed during the response to the fire. The ship’s engineers closed the outlet valve the following morning to halt leakage from the fuel system identified during their post-fire inspection of the AER. Remote stop activation panels on the bridge and in the ECR enabled the fuel pumps, including the fuel feed pump to the AEs, to be stopped remotely in the event of an emergency. The remote stops for the fuel pumps were not activated during the response to the fire before the loss of electrical power on board. Fire detection system Finnmaster was fitted with an automatic fire detection system. In the event of a low level of smoke being detected in a space, a pre-warning would sound an alarm on the bridge and at the remote stations in the ECR and in the cargo control room. This alarm required acknowledgement within 2 minutes to prevent the fire alarm sounding throughout the ship. The detection of a significant amount of smoke would initiate an immediate fire alarm. The location of any detected smoke would be displayed on the fire alarm panels. The AER had a single smoke detector fitted at deckhead level between the two AEs. The smoke generated when the flexible hose on AE2 failed, releasing fuel onto a hot surface, was sufficient to trigger an immediate fire alarm that sounded throughout Finnmaster. 1.7 AUXILIARY ENGINES 1.7.1 General Finnmaster’s marine variant Mitsubishi Heavy Industries (MHI) S12R series AEs were 12-cylinder, V-configuration, direct fuel injection engines with a maximum continuous rating of 1,088kW at a speed of 1,500 revolutions per minute. Each bank of six cylinders on the engine had a separate high-pressure fuel injection pump driven by the main gear wheel through an accessory drive at the rear, or flywheel, end of the engine13. The exhaust outlet from each bank of cylinders led to a separate turbocharger at the aft end of the engine. 13 On Finnmaster the auxiliary engines were installed with the front of the engine at the forward end of the compartment and the rear of the engine at the aft.
17 The wiring for both engine alarm and shutdown functions led to a frame-mounted terminal box positioned next to AE1 between the two alternators. This terminal box also contained the cabling for the engine stop solenoids, which needed to be energised for the engines to operate. 1.7.2 Operating parameters The engine that was to become AE2 was tested in the Netherlands at Mitsubishi Heavy Industries Equipment Europe B.V.14 before being delivered to the shipyard for installation on Finnmaster. Under test, AE2 delivered 871kW with exhaust gas temperatures of 561°C from the left six-cylinder bank and 564°C from the right six-cylinder bank. A common exhaust gas temperature of 453°C after the turbocharger was recorded. Exhaust gas temperatures of approximately 400°C after the turbocharger at loads of 450kW were recorded in Finnmaster‘s engine room logbook during normal operation. At the time of the fire AE1 and AE2 were connected in parallel. Each alternator was supplying 200kW to 250kW, rising to around 600kW when the bow thruster was in use. 1.7.3 Fuel system Finnmaster’s two AEs ran on MGO supplied from a service tank sited immediately aft of the AER. The MGO had a flash point of 60°C and an autoignition temperature of approximately 240°C. At the time of the fire the service tank contained 8.5m³ of MGO, equating to a level of 1.58m measured from the bottom of the tank. A remotely operated outlet valve from the service tank led to a fuel feed pump that pressurised the fuel supply to the engines. A duplex filter installed after the feed pump provided the initial filtration of the fuel before the system divided to supply the AEs. A manual valve in the system allowed each AE to be isolated individually. The fuel system divided after the engine’s fuel isolation valve to feed the two high-pressure fuel injection pumps via two sets of fuel cartridge filters (Figure 7). The two AEs operated on a four-stroke cycle. Fuel injection happened on every second rotation of the crankshaft. To achieve this, the gear arrangement for the high-pressure fuel injection pumps rotated at half the speed of the engine. Each cylinder on the AE was fitted with a single fuel injector. The fuel injection pumps supplied a metered volume of fuel to each fuel injector at a specific point in the rotation of the engine. The static timing of the injection was 23° before top dead centre (TDC)15 towards the end of the compression stroke. A single-speed governor controlled both fuel injection pumps on each engine, adjusting the position of the fuel injection pump control rack, and hence the amount of fuel injected, to maintain the engine at a constant speed as the load on the engine varied. 14 The company name subsequently changed to Mitsubishi Turbocharger and Engine Europe B.V. 15 The angular position of the crankshaft when the piston is in its uppermost position.
18 Figure 7: Auxiliary engine fuel system For illustrative purposes only: not to scale Service tank Remotely operated valve Fuel feed pump Duplex filters Fuel cartridge filters To AE1 Fuel isolation valves Turbochargers Alternator High-pressure fuel injection pump AE2 Pressure switches Flexible hose assemblies Pressure gauges
19 Fuel injection pump coupling Each fuel injection pump drive had a coupling between the accessory drive on the engine gear case and the fuel injection pump drive shaft. The couplings comprised two coupling flanges separated by two laminated plate stacks with a cross-coupling in between. The laminated plate stacks were secured on each side by an M1216 bolt passed through a bushing set into the holes in the laminated plates (Figure 8). The service instructions identified that the rounded washers’ orientation against the laminated plate stacks was key to prevent damage to the plates. A solid steel cover extended over the coupling assembly to protect crew from the rotating parts. The fuel injection timing could be adjusted by loosening the two bolts in the slots of the drive end coupling flange, turning the fuel injection pump coupling flange relative to the position of the engine to the desired position, then retightening the bolts. The timing adjustment slots extended over an arc of 22° on the coupling. The difference in rotational speed of the fuel injection pump drive compared to the crankshaft meant that an alteration of 1° in the timing adjustment slot would have the effect of changing the fuel injection timing by 2° against the position of the crankshaft. Over time, MHI had modified the fuel injection pump coupling design. The details of these modifications were published in MHI service bulletins and included design changes, compatibility with existing parts, part number references and amendments to the servicing instructions. Service bulletins did not require an immediate change to the parts or maintenance procedure referred to. A field campaign would be completed if the engine manufacturer decided an immediate change was needed. No field campaign was initiated for any of the design changes to the fuel injection pump couplings installed on Finnmaster’s AEs. Renewal coupling components for the AEs were sourced from MHI as the original equipment manufacturer (OEM). AE2 fuel injection pump coupling damage The inboard fuel injection pump coupling on AE2 had partially failed. Both bolts connecting the drive end coupling flange to the first set of laminated plates in the coupling assembly had failed. The bolts remained lodged in their respective timing adjustment slots and laminated plate stacks. One bolt was intact, and the other had sheared part way along the length of the shank (Figure 9). The intact bolt was wedged in position between the cross coupling and drive end coupling flange (Figure 10). The bolt shank was heavily worn and the bolt head was worn on its upper surface. The nut from this bolt was retrieved from the tank top below the engine following the fire. The sheared bolt was heavily worn across the fracture of the shank and its head was worn where it had been in contact with the cross coupling. The end of the bolt and nut were retrieved from the tank top below the engine following the fire. After the failure the rounded washers remained in place where the bolts passed through the laminated plates. The washers were oriented in line with the servicing instructions. 16 Metric thread (M) + the outer diameter of the thread in mm.
20 Figure 8: Fuel injection pump coupling Exploded component parts diagram overlaid with coloured dots and a corresponding shows, from top left to bottom right, a drive end coupling flange, two sets of laminated plates separated by a central cross coupling and a fuel injection pump coupling flange. Bolts, bushings and rounded washers are used in the assembly. Close-up of the failed coupling on Finnmaster’s auxiliary engine overlaid with coloured dots that correspond to the component parts detailed in the following diagram. Laminated plate stack Rounded washer Bushing M12 bolt Cross-coupling Fuel injection pump coupling flange Drive end coupling flange Image courtesy of Mitsubishi Heavy Industries Engine & Turbocharger Ltd. (Service Bulletin 16-411-E) Timing adjustment slot
21 Close-up of a deep groove in the body and worn thread on the shank of an intact bolt with a bush in situ at the head. Beneath it lies the retrieved nut. Close-up of an in situ bush fitting from the head of a bolt and a retrieved nut with a sheared thread from the shank of a bolt retained in it. Figure 9: Damaged coupling drive bolts Bush Deep groove Worn shank Retrieved nut Shank of bolt retained in retrieved nut Bush Figure 10: Fuel injection pump coupling with failed bolt in situ View towards the side of the inboard fuel injection pump with the left-hand side position of the fuel injection pump coupling highlighted to show, from left to right, the fuel injection pump coupling flange and second laminated plate stack separated by a cross-coupling. Close-up shows the angled head of a bolt lodged between a cross-coupling and a laminated plate stack. A thin layer of white powder covers the surrounding surfaces. Fuel injection pump Fuel injection pump coupling Failed bolt
22 The laminated plates on the drive end of the inboard fuel injection pump coupling were damaged and cracks ran from the coupling bolt holes (Figure 11). This damage extended through the full thickness of the laminated plate stack with substantially more damage on one side than the other. The face of the drive end plates adjacent to the drive bolt holes showed evidence of fretting damage. Witness marks were visible on the surface of the drive end coupling flange where the flat washer had previously been seated (Figure 12). An examination of the accessory drive assembly in the gear drive for AE2’s inboard fuel injection pump did not indicate any defects. 1.7.4 Exhaust system General Each AE cylinder emitted exhaust gases into one of two manifolds. The manifolds were constructed of cast steel sections joined by stainless steel expansion bellows secured at each end by a gas-tight clamping arrangement. The two exhaust manifolds each led to a turbocharger at the rear of the engine. From the outlet of the turbochargers, the exhaust was joined to a common exhaust pipe that was bolted to the exhaust uptake leading to the funnel. Between the outlet from each turbocharger and the exhaust pipe was a cast steel transition ring, which was clamped to the turbocharger outlet casing. The other end of this ring was fitted with a sealing arrangement that allowed a degree of axial movement between the engine and the exhaust pipe. The seal took the form of two spiral wound seal rings set into radial grooves in the transition ring (Figure 13). Exhaust insulation The exhaust system on each of the auxiliary engines was installed within an insulated box structure to prevent contact of the flammable liquids with the very high temperature surfaces of the turbocharger turbine casings and central exhaust pipe (Figure 14). A transverse oil supply pipe for the turbocharger bearings ran along the lowest point of the insulated box structure. Behind this pipe there was a gap of approximately 25mm between the lowermost panel of the box structure and the engine frame. Figure 11: Drive end laminated plate damage Looking down onto a thin curved sheet of metal with a hole covering about a third of its surface width. A short crack extends from the lower left-hand edge of the hole to the outer edge of the metal sheet, while a long crack runs from the lower right-hand edge of the hole to the metal sheet’s inner edge. Two small triangular sections of metal are missing where the cracks intersect with the hole. Drive bolt hole Plate cracks Fretting damage Figure 12: Witness marks on drive end coupling flangeClose-up of a narrow slot in the drive end coupling flange component of the fuel injection pump coupling. A labelled arrow identifies scratches on the flange as witness marks. Timing adjustment slot Witness marks of previous washer position Drive end coupling flange
23 Exploded component parts diagram of AE2’s exhaust system overlaid with orange arrows showing the horizontal path of exhaust gases through the system until their vertical exit through the exhaust pipe. The sealing arrangement of the transition ring between the turbocharger and exhaust pipe comprises two spiral wound seal rings that fit into grooves in the transition ring and provide a seal where the ring fits into the exhaust pipe. A yellow gloved hand holding a metal ring with white deposits on its surface. Arrows from the exploded diagram point to coloured lines around the edges of the transition ring, identifying them as the spiral wound seal rings. Figure 13: AE2 exhaust system Exhaust pipe Turbocharger Passage of exhaust gas from manifold Transition ring Spiral wound seal rings Image courtesy of Mitsubishi Heavy Industries Engine & Turbocharger Ltd. Figure 14: AE2 exhaust insulation Image courtesy of Det Norske Veritas AS 2021 photograph is a view from AE2’s outboard side looking towards dirtier engine components. A flexible hose runs from the other side of the engine and across the casing below the turbocharger. Insulated box structure Engine flywheel cover Insulation blankets AE2 inboard turbocharger Insulation in 2003 Insulation in 2021
24 In April 2003, a survey by a DNV surveyor verified that the installation on AE2 met the requirements for the protection of the high temperature surfaces. Insulation blankets were installed over the original insulated box structure, covering the two turbocharger turbine casings and the central exhaust pipe. The insulation blankets were in place at the time of the fire and extended down to the top of the flywheel cover between the engine and alternator. AE2 engine exhaust system damage The surfaces of the insulation blankets over the turbochargers of AE2 were found to be heat damaged following the fire. Beneath the insulated box structure, witness marks on the support frames for the outboard turbocharger showed evidence of gas emitting from the junction of the turbocharger outlet transition ring. The marks extended over an arc of approximately 120°, angled down towards the top of the engine block (Figure 15). Disassembly of the outboard turbocharger allowed the removal of the exhaust transition ring. A layer of hardened insulation cement compound was partially in place at the junction of the transition ring and the exhaust pipe. When the transition ring was removed, the cement compound was found to extend the length of the ring past the seal arrangement. The spiral wound seal rings were seized in their grooves, and there was evident clearance between the transition ring and the exhaust pipe (Figure 16). No evidence of leakage from the exhaust system of AE2’s inboard turbocharger was visible, though the rings were similarly contaminated by insulation cement compound. 1.7.5 Alarm and monitoring system Finnmaster was constructed in line with DNV classification society rules. The DNV rules set the requirements for alarm, monitoring and automatic shutdown systems and accounted for the operation of the ship in UMS mode. The alarms for each AE were connected to a bespoke panel in the ECR that provided engine control and alarm monitoring functions. This panel allowed the engineers to monitor the alarm status of each AE and manually start and stop it as necessary. A separate machinery alarm and monitoring system was provided to manage the UMS operation of Finnmaster, allowing the engineers to monitor the machinery and be alerted to any abnormality. An alarm registered on the AE control and monitoring panel would also trigger an alarm in the machinery alarm and monitoring system. Local thermometers provided the means to monitor the exhaust gas temperature after the turbocharger on the AEs on Finnmaster. The thermometer sensors were located in pockets in the exhaust pipe on the turbocharger outlet, close to the junction of the gas flows from the inboard and outboard turbochargers. Finnmaster did not have any means of remote oversight of the AEs’ exhaust temperatures.
25 Close-up section of a smoke and fire-damaged turbocharger shows discolouration to the steel plating where gas has scored its surface. A label with an arrow identifies one of the pipes running beneath the turbocharger frame’s plating as the failed flexible fuel hose. The turbocharger oil supply pipe is just above this. Figure 15: Gas scoring marks on turbocharger frame surface AE2 outboard turbocharger casing Gas scoring on turbocharger frame Turbocharger oil supply pipe Failed flexible fuel hose Figure 16: Turbocharger exhaust gas outlet transition ringA yellow gloved hand holds a metal ring with white deposits on its surface that a label identifies as insultation cement compound. Coloured lines around the edges of the transition ring are identified as spiral wound seal rings. Spiral wound seal rings Transition ring Insulation cement compound
26 Modification to alarm and monitoring system At some point between 2003 and 2006, Finnmaster’s alarm and monitoring system was modified to alert the ship’s engineers if the fuel pressure supplied to the AE’s fuel injection pumps fell below 0.5 bar, and to enable local monitoring of the fuel supply pressure. The modification involved the installation of two pressure gauges and two pressure switches on the local instrument panel of each AE. The two pressure switches serving each AE were electrically connected to the associated AE alarm and monitoring panel in the ECR. If the fuel pressure fell below the set pressure an alarm would sound on the alarm and monitoring panel as well as on the local machinery alarm and monitoring system. A flexible fuel hose led to the local instrument panel from a banjo connection17 on the fuel cartridge filter outlet on each side of the engines. The flexible hose assemblies each consisted of a single length of hose with steel fittings crimped at either end. The 3.6m flexible fuel hose installed on AE2 from the inboard fuel cartridge filters was routed aft, over the top of the fuel injection pump and across the flywheel cover of the engine to the local instrument panel. The flexible hose passed below the exhaust insulation blankets fixed over the insulated box structure that covered the exhaust system at the aft end of the engine (Figure 17). The flexible hose was looped across the back of the frame around the local instrument panel and connected to a steel tee piece at the bottom of the frame. Steel pipes led from the tee piece connection and on through separate isolation valves to the pressure switch and pressure gauge. Plastic cable ties secured the length of the flexible fuel hose. The flexible hose passed over the flywheel cover at 1.08m above the level of the bottom of the daily service tank. The 1.7m flexible fuel hose routed aft from the outboard cartridge filters on AE2 passed above the outboard fuel injection pump and across the junction of the engine and alternator to the frame of the local instrument panel. The flexible hose was then also looped across the back of the frame before connecting to the pressure gauge and pressure switch through steel pipes in a similar configuration to the inboard pipework. To retain classification, the DNV rules required changes to a hull, machinery, equipment or systems covered by classification to be documented and approved in advance. A proposal for the modification to Finnmaster’s alarm and monitoring system had not been submitted to DNV for assessment and no approval was granted. The DNV rules permitted the use of flexible hoses in fuel systems limited to a length necessary to provide for relative movement between fixed and flexibly mounted items of machinery/equipment or systems. The rules also required means to be provided to isolate flexible hoses used in systems for fuel oil. The only valve in the instrumentation line was at the local instrument panel and served only to isolate the pressure gauge and pressure switch. 17 A hydraulic fitting comprising a perforated hollow bolt and a spherical union. The bolt is assembled through the centre of the union to create a fluid path between the external ports on the union and bolt.
27 An illustrated thick orange line on the 3-D diagram depicts the routing of the flexible hose assembly, starting on top of a cylindrical banjo connection and continuing aft over the top of the fuel injection pump and over the flywheel cover to the instrument panel. Illustrated red circles at various points along the orange line are linked to inset images by red directional arrows. Close-up of the flexible hose as it passes around the inboard aft corner of the filter between the fuel injection pump and the exhaust.Close-up of the pipe passing over the fuel injection pump. Close-up of the top of a bolt within a vertical spherical union. Banjo connection to cartridge filters Instrument panel Close-up of the fire-damaged instrument panel, its surfaces coated with a fine white powder. Figure 17: Routing of flexible fuel hose from the inboard cartridge filters to the AE2 local instrument panel Close-up of the insulated blanket around the exhaust. Exhaust insulation blanket
28 The banjo connection at the fuel cartridge filter outlet was an open connection without any means of closure. The flexible fuel hose remained under pressure at all times unless the engine in question was isolated as a whole from the main fuel supply. In June 2006, a DNV surveyor issued a Condition of Class18 to Finnmaster for the condition of the exhaust insulation on the main and auxiliary engines and included a photograph of the insulation in the survey record. Visible in this photograph was the flexible fuel hose from the inboard fuel cartridge filters where it passed over AE2’s flywheel casing. The flexible hose was not visible in a photograph taken during the survey for the protection of high temperature surfaces in April 2003. 1.7.6 AE2 major overhaul From 4 October to 10 October 2017, three Inter Marine Oy (Inter Marine) technicians carried out a scheduled overhaul of AE2 under the supervision of a maintenance manager. The engine had completed 48,750 running hours. The engine was disassembled during the overhaul and components were serviced or renewed as necessary based on their condition. Any replacement parts were sourced from the OEM by Inter Marine. Reconditioned fuel injection pumps were installed in line with the OEM procedure, which used a go/no-go gauge19 to measure the distance between the face of the fuel injection pump drive coupling half and that of the fuel injection pump flywheel to confirm the coupling was correctly aligned. Reconditioned turbochargers were installed on the engine using the existing transition rings fitted to the exhaust outlet. There were no records that the seal rings20 on the transition rings were replaced during the service as required by the service instructions. On assembly, a sealing compound was used to fill the annular gap between the transition ring and the exhaust pipe (Figure 18). This was contrary to the servicing instructions, which required that new seal rings were fitted and that no sealing compound was used. Finnmaster’s crew did not actively monitor the engine overhaul. The PMS records stated that the C/E surveyed the engine on completion of the service. The post- maintenance trials and alarm tests were witnessed by the chief engineer and a surveyor employed by RINA. The records indicated that the trials and tests were satisfactory but did not include the low fuel pressure alarms in the list of alarms tested. 18 Specific remedial measures issued by a surveyor on identification of a defective or damaged survey item affecting the ship’s classification. 19 A tool used to test a dimension against a specific tolerance. One end of the tool will fit the assembly dimension being measured (go) but the other end will not (no-go). 20 MHI part number 37432-14700.
29 1.7.7 Maintenance of AE2 fuel injection pump couplings Operation and maintenance manual The maintenance requirements for the AEs were set out in the operation and maintenance manual supplied by MHI when Finnmaster was built. A statement in the manual enabled operators to shorten the scheduled intervals between maintenance if it was considered necessary. The original manual contained a task to retighten all bolts and nuts on the engine at 1,000-hour intervals. A further 1,000-hour task required a visual check of the fuel injection timing. This latter requirement was later revised to a 2,000-hour frequency, and this change was reflected in the manual carried on board Finnmaster. In July 2016, Mitsubishi21 revised the manual for the AEs to include a 2,000-hour requirement to check the fuel injection pump laminated plates. The manual also included a requirement for a major engine overhaul between 8,000 and 12,000 hours. Alternative maintenance instructions The fuel injection pump coupling maintenance regime had undergone numerous updates since the AEs’ installation on Finnmaster. The changes were set out in MHI service bulletins, which had been filed with the on board copy of the operation and maintenance manual. A separate service manual provided instructions for the method of overhauling the engine and specified the torque settings to be used for tightening the fixings. From April 1997, the fuel injection pump coupling incorporated the use of high-tensile steel bolts, identifiable by a number 10 stamped on the head of the bolt, with a higher tightening torque setting than had previously been applied. 21 The company was renamed Mitsubishi Heavy Industries Engine & Turbocharger, Ltd on 1 July 2016. Figure 18: Use of insulation cement on the inboard turbocharger transition ring seal 2017 photograph is a close-up view of a bright and shiny exhaust transition ring in situ between, from left to right, the exhaust pipe and turbine casing. The junction between the ring in the centre of the picture and the exhaust pipe is seen to be coated with a cream coloured paste. 2021 photograph is a post-fire close-up view of a dull metal, slightly corroded exhaust transition ring. The paste appears patchy and there are gaps where the transition ring enters the exhaust pipe. Overhaul of AE2 in 2017 Following fire in 2021 Exhaust pipe Insulation cement Exhaust transition ring Turbocharger turbine casing
30 The AE fuel injection pump couplings on Finnmaster were fitted with M12 x 1.25 bolts that were marked with the number 10. The service manual on board reflected the torque setting for this type of bolt. Planned maintenance system requirements The PMS on Finnmaster contained two jobs specific to the fuel injection pump couplings on the auxiliary engines: At a frequency of 2,000 hours, a check of the fuel injection pump drives including the coupling bolts; and, at a frequency of 5,000 hours, a check of the fuel injection timing of the engine. There was no requirement in the PMS to check the security of any bolts on the engines at 1,000-hour intervals. Finnmaster AE maintenance records The maintenance of the AE2 inboard fuel injection pump coupling was recorded in the PMS. The maintenance records for the period between October 2017 and the fire on 19 September 2021 is summarised in Table 1. Date Engine hours Notes as written 11 October 2017 48,750 AE2 service completed 18 June 2018 49,981 Injection pump coupling problem One nut had loosened and dropped from the right‑side pump coupling and the injection timing had changed. There was one washer missing from another bolt (between laminate plate and coupling) which caused the nut to loosen from another side bolt. Bolts, bushings, washers, nuts and laminate plates were changed to new ones on right side and of course Injections timings were re- adjusted. Also checked LH injection pump coupling but everything was ok there. [sic] 20 January 2019 52,081 Checked tightening of the injection pump coupling bolts. No loosen bolts founded. Also checked injection timing. [sic] 4 February 2020 54,119 Checked tightening of the injection pump coupling bolts. No loosen bolts founded. Also checked injection timing. [sic] 9 September 2020 55,034 No remarks 19 September 2021 56,365 Engine fire Table 1: PMS records of AE2 fuel injection pump couplings
31 On 29 April 2021, the 2/E left Finnmaster. Before departing on leave, the 2/E completed a set of handover notes containing details of the work completed during their time on board. The handover notes stated that AE1/AE2 bolts on coplings is tighted and fixed by locktide 27022 [sic]. There was no corresponding entry in the PMS to reflect this work, though the spare gear transactions recorded in the PMS showed the withdrawal of coupling components from stock on 7 April 2021. The engine manufacturer did not recommend the use of a thread-locking compound on the coupling bolts. Anecdotal evidence from the engine manufacturer, the service technicians, and ship’s engineers working for Finnlines and on other ships operating Mitsubishi S12R engines indicated that bolt failure and slippage of the fuel injection pump coupling resulting in a loss of the fuel injection timing was a known weakness. 1.7.8 Flexible fuel hose routine inspection and replacement No inspection or maintenance records for the flexible fuel hoses before Finnlines took Finnmaster into management were available. Finnlines did not have a system for recording the identity and maintenance history of individual flexible hoses on board. In October 2018, Finnlines engaged a hydraulic hose company to assess the condition of the flexible hoses and expansion joints on the auxiliary engines on board Finnmaster. The report produced by the company noted various defects in the flexible hose installation but did not comment on the length or routing of the flexible hose assemblies. In December 2018, the hydraulic hose company replaced AE2’s flexible hoses like-for-like, including those between the fuel cartridge filters and the local instrument panel. The replacement flexible hoses had an oil-resistant synthetic nitrile rubber inner tube with two braids of high-tensile steel wire sheathed in a synthetic rubber exterior cover. Flexible hose assemblies used on board Finnmaster were required to be approved for use by RINA. The flexible hose used held a valid RINA type approval certificate23 that set out the criteria for its use. This certificate did not state that the flexible hose met a fire resistance standard nor include fuel systems in its range of application. A later RINA type approval certificate24 for the same flexible hose did include this information. The replacement of the flexible hoses on the auxiliary engines was overseen by Finnmaster’s engineers. The PMS entry for the work indicated that the C/E had undertaken a survey of the completed work. No type approval certificate was provided to the ship on completion of the maintenance. 1.7.9 Maintenance service providers Inter Marine was based in the port of Kotka, Finland, and provided a wide range of engineering support services focused mainly on the maritime sector. The company was experienced in maintaining Mitsubishi engines and employed ex-ships’ engineers as technicians to undertake the work. 22 Loctite 270 is a high-strength thread locking compound for securing bolts, nuts and studs to prevent loosening due to vibration. 23 RINA Approval MAC215618CS/02. 24 RINA Approval MAC3247221CS/003.
32 Inter Marine was accredited to provide service and sales of Mitsubishi engines by Mitsubishi Turbocharger and Engine Europe B.V. (MTEE), the Netherlands-based European subsidiary of the MHI group of companies. The contract between Inter Marine and MTEE gave Inter Marine access to the service and training literature for Mitsubishi engines. MTEE provided individual training to service personnel, both at their Netherlands site and via online tutorials. MTEE held an International Organization for Standardization (ISO) 9001:2015 quality management certificate issued by Lloyd’s Register Quality Assurance. Clause 8 of the ISO9001:2015 standard set out the requirements for monitoring, inspection or testing activities undertaken by the company to ensure the quality of services provided. MTEE did not undertake audits of the accredited service providers but had recognised a need to do so before the COVID-19 pandemic of 2020. The pause in operations during the pandemic had delayed any development of a programme to verify the conduct of accredited service providers. Inter Marine was not certified to a quality standard. Inter Marine did not have a rolling agreement for work undertaken on the Finnlines fleet, though the work they did formed a significant proportion of its overall business. Each job was quoted individually for service and spare parts. Finnlines had identified Inter Marine as a key supplier of services and completed an audit of the company in May 2017. The report produced following the audit recognised the ability of Inter Marine to provide the technical services required. It indicated that the primary focus of the audit was supply chain risk elimination. Secondary to this was the assessment of the quality, environmental, ethical and regulatory aspects of the company’s performance. 1.7.10 Machinery survey and inspection General The machinery on Finnmaster was required to be maintained to the technical aspects of the relevant International Maritime Organization (IMO) conventions on machinery installations, and the rules of a classification society recognised by the TRAFICOM as the ship’s administration. From Finnmaster‘s delivery the ship’s classification societies, DNV until 1 January 2016 and thereafter RINA, had conducted statutory surveys on behalf of TRAFICOM in addition to the surveys they completed to maintain the certificates of classification. The statutory surveys required by SOLAS Chapter I, Regulation 1025 included inspection of the machinery and equipment, control systems and electrical installations to ensure that they remained satisfactory for the ship’s intended service. Both DNV and RINA were members of the International Association of Classification Societies (IACS). The IACS was an organisation of classification societies that established common minimum technical standards and procedural requirements among its members. 25 Surveys of Structure, Machinery and Equipment of Cargo Ships.
33 DNV surveys of AE2 The DNV rules required that surveyors undertaking the annual survey for crediting the certificate of classification complete a general survey of the hull, machinery, equipment and systems to confirm that the ship remained in satisfactory condition and in compliance with approval or accepted standards. Additionally, the specific survey requirements for machinery and systems during each annual survey included a verification of the integrity/function of the shielding of flammable oil piping systems and insulation of hot surfaces exceeding 220°C. Until the DNV rules were amended in July 2013, the annual survey also included a survey of alarm functions, control panels and local indicating instruments. After this date, the rules were amended to require an examination of the electrical and mechanical condition of the control and monitoring system and a test of alarm function. The amended rules did not explicitly require examination of the local indicating instruments. During surveys for the renewal of the certificate of classification, the survey of auxiliary systems included a test of alarm and safety functions. The examination of the fuel oil system pipes, valves and filters at the renewal survey was permitted to be undertaken through a visual examination and performance test. No specific reference was made in the DNV rules to the IMO guidance contained in the IMO publications MSC/Circ.64726 or, latterly, MSC.1/Circ.132127. The DNV rules provided technical requirements aligned with the contents of the circulars but did not outline the installation, inspection and maintenance guidance detailed within them. The initial machinery surveys carried out after Finnmaster entered service were completed by DNV surveyors under a Continuous Machinery Survey (CMS) framework. The CMS framework allowed for the systematic survey of machinery such that all equipment would be surveyed once within a 5-year period. These surveys would be undertaken by an attending classification society surveyor; however, the classification society’s rules allowed some to be carried out by the ship’s C/E, including surveys of the AEs. The DNV survey rules required partial or full disassembly of the AEs and, when considered appropriate by the surveyor, an engine function test. Alarms and safety systems were to be subject to a performance test. In May 2004, the company operating Finnmaster requested that the system used for the survey of machinery on board be changed. The new system of survey, called machinery planned maintenance system (MPMS) enabled the classification society’s surveys to be credited based on the maintenance activities recorded in a ship’s approved PMS, supported by additional checks carried out by a DNV surveyor if deemed necessary. The system had a degree of flexibility, enabling variations to be made to the maintenance schedules based on the experience of the operator. 26 Maritime Safety Committee/Circular.647 – Guidelines to Minimize Leakages from Flammable Liquid Systems. 27 Maritime Safety Committee.1/Circular.1321 – Guidelines for Measures to Prevent Fires in Engine-Rooms and Cargo Pump-Rooms.
34 From the implementation of MPMS on board Finnmaster to the transfer of classification to RINA in January 2016, an annual assessment was conducted by a DNV surveyor to verify compliance with the MPMS requirements. The assessment included an audit of the PMS and a general inspection of the machinery on board. Besides the annual general inspections completed as part of the classification survey, DNV had completed specific surveys of AE2 in 2006 for the issue and subsequent deletion of a condition of classification when the flexible hose assemblies were in place. RINA surveys of AE2 On 1 January 2016, Finnmaster changed classification societies from DNV to RINA at the request of the ship’s owner. The change followed an IACS procedure for transfer of classification between member classification societies28. The ship’s machinery survey system reverted to a CSM framework under RINA’s oversight. The checklist used by RINA surveyors during the conduct of annual classification surveys required a general examination of the machinery and boiler spaces with particular attention to fire and explosion hazards29. The 2017, AE2 survey records on board Finnmaster indicated that the fuel injection devices; turbo blowers; and tripping/alarm/safety device [sic] had been surveyed. The PMS record stated that the survey of AE2 at that time was completed by the C/E and that a test of the alarm and trip functions was undertaken. The list of alarm tests in the PMS did not include the fuel low pressure alarms for the AEs. The post-service survey of AE2 was recorded by RINA in its central recording system. The RINA record indicated that a satisfactory test of AE2 and survey of the engine components was carried out, appending the report provided by Inter Marine. The record did not indicate that the survey was conducted by the C/E, which implied that it had been completed by the attending RINA surveyor. The RINA rules did not explicitly require the survey to be completed by a surveyor, stating only that: Generally, within a 10-year cycle comprising two consecutive classification cycles, all the items surveyed under CMS are to be inspected once by the Society’s Surveyors. [sic] In June 2018, RINA surveyors completed statutory surveys for the renewal of the safety construction and safety equipment certificates held by Finnmaster. The surveys included: A general examination of machinery and boiler spaces with particular attention to the fire and explosion hazard. A general examination of the machinery, steam, hydraulic, pneumatic and other systems and their associated fittings, for confirmation of their proper maintenance. 28 IACS procedure PR1A – Procedure for Transfer of Class (Revision 3). 29 RINA report of machinery annual form: Item MA.2.01.
35 Between 4 May 2021 and 17 May 2021, a survey for the intermediate safety construction certificate was carried out. This survey included: A confirmation that the machinery, boilers and other pressure vessels, associated piping systems and fittings are installed and protected so as to reduce to a minimum any danger to persons on board, due regard being given to moving parts, hot surfaces and other hazards. The survey checklist for the safety construction survey30 referred to SOLAS Chapter II-2, Regulation 4.2, relating to restrictions on the use of flexible pipework in oil fuel piping systems. The checklist entry completed during the survey indicated this check had been completed. Delegation of machinery surveys The rules of the classification societies required chief engineers undertaking surveys on their behalf to meet specific qualification, experience and employment criteria. The DNV requirements at the implementation of MPMS on board Finnmaster required a ship to be manned by chief engineers who were familiar with the PMS and a chief engineer approved by DNV to be on board at least 50% of the time. The requirements for approval of a chief engineer were that the company confirmed the required qualifications of the chief engineer and that they had sailed a minimum of 3 years as chief engineer or were serving as chief engineer and had been employed with the company for at least 3 years. The DNV rules stated that the company was responsible for ensuring that a chief engineer was qualified to register and carry out maintenance on all classification related machinery items, referring to the International Convention on Standards of Training, Certification and Watchkeeping for Seafarers (STCW), 1978, as amended, section III/131. The RINA survey requirements stated that the company was responsible for ensuring the chief engineer was qualified to register and carry out maintenance on all classification-related items. RINA also required a C/E to hold the STCW certificate of competency appropriate to the power of the main propulsive installation of the ship, and have at least 3 years of seagoing experience as a senior engineer officer on ships of the relevant type. The RINA rules required the company to provide the C/E with a copy of the appendix to the RINA classification rules on surveys by C/Es32. This appendix provided general guidance on the conduct of surveys, stating that: As regards the procedure for carrying out surveys, the Owner is to inform the chief engineer that surveys are to be conducted in accordance with the rules of the society and, specifically, the requirements for classification renewal surveys related to machinery and systems contained in Ch 3, Sec 5[3]33 [sic] 30 RINA report of SAFCON H INTERMEDIATE: Item CA.2.09. 31 Mandatory minimum requirements for certification of officers in charge of an engineering watch. 32 RINA Rules: Annex 1 to Part A, Chapter 2, Appendix 1 – CMS and PMS: Surveys carried out by the chief engineer. 33 RINA Rules: Part A, Chapter 3, Section 5 – Class renewal surveys.
36 Finnlines produced a booklet defining the PMS roles and responsibilities of people working on board its ships and ashore. Section 2.1 of the booklet stated that the person responsible for the PMS was the chief engineer which is duly recognized by the Classification Society to plan, carry out and record Survey jobs at the scheduled due dates according the Planned Maintenance System Database [sic]. Finnmaster surveys conducted by a C/E were subject to a confirmatory survey by a RINA surveyor that included an external examination of the equipment surveyed. 1.7.11 Further regulation and guidance The ISM Code Chapter IX of SOLAS applied the requirements of the International Management Code for the Safe Operation of Ships and for Pollution Prevention (ISM code). The ISM code required the company to establish procedures to ensure that the ship was maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may have been established by the Company [sic]. Section 10.3 of the ISM code stated that: The Company should identify equipment and technical systems the sudden operational failure of which may result in hazardous situations. The safety management system should provide for specific measures aimed at promoting the reliability of such equipment or systems. These measures should include the regular testing of stand-by arrangements and equipment or technical systems that are not in continuous use. [sic] The ISM code also required that the measures aimed at promoting the reliability of equipment identified under the provisions of section 10.3 of the Code be integrated into the ship’s operational maintenance routine. In 2001, the IACS produced Recommendation 74 – A Guide to Managing Maintenance in Accordance with the Requirements of the ISM Code34 (Recommendation 74) to help ship operators meet the maintenance requirements of the ISM Code. The recommendation provided ship operators with guidance on a systematic approach to maintaining their ships, specifically that: The Company’s responses should be aimed not only at the rectification of the immediate technical deficiency, but also at addressing the underlying maintenance management system failures (non-conformities) that led to the problem in the first place. Any lessons learned from the investigation of these failures should be examined for their applicability to other ships in the fleet, and the resulting trends and patterns should be used to identify opportunities for continual improvement. [sic] 34 Revised in May 2008 and August 2018.
37 SOLAS requirements governing the use of flexible hose assemblies When the alarm system on Finnmaster was initially modified, SOLAS II-2 allowed the restricted use of flexible hoses on board ships where the administration was satisfied that they were necessary. SOLAS required that flexible hose assemblies used in fuel systems be of an approved fire-resistant type and, at that time, referenced MSC/Circ.647, as supplemented by MSC/Circ.851 – Guidelines on Engine-Room Oil Fuel Systems. IMO guidance on flexible hose assemblies The guidelines in MSC/Circ.647 were developed to, assist designers, shipyard personnel, engine-room personnel, owners, operators and maintenance personnel to be aware of measures that should be taken to reduce fires originating from machinery space flammable oil systems. In June 2009, the IMO published MSC.1/Circ.1321 consolidating existing IMO guidance on the prevention of fires in machinery spaces, including MSC/Circ.647. Both MSC/Circ.647 and MSC.1/Circ.1321 contained guidance on the use of flexible hose assemblies stating that: Flexible pipes, hoses and hose assemblies – which are flexible hoses with end fittings attached – should be in as short lengths as practicable, but should not, in general, exceed 1.5m in length, and only be used where necessary to accommodate relative movement between fixed piping and machinery parts. The guidance further recommended that flexible hoses be constructed to a recognised standard, approved for their intended use, inspected frequently, and replaced should there be signs of distress likely to lead to failure. It also raised the expectation that flexible hose assemblies would require replacement a number of times in the life of the ship. MSC.1/Circ.1321 also provided recommendations on the installation of pressure, temperature and oil level gauges, stating that: All pressure gauges and other similar instruments in oil systems should, wherever possible, be fitted with an isolating valve or cock at the connection to the pressure take off point. The number of pressure take off points should be kept to a minimum and gauge piping runs should be as short as practicable. [sic] TRAFICOM had not actively promulgated the guidance as invited to by the IMO in both MSC/Circ.647 and MSC.1/Circ.1321. Classification society rules and guidance on flexible hose installations TRAFICOM had delegated the responsibility for statutory certification services for ships registered in Finland to six classification societies, each acting as a Recognised Organisation (RO)35. The delegations were set out in formal agreements with each individual RO. The level of delegation in these agreements included the survey of ships for compliance with the main conventions, including SOLAS. 35 Classification societies working under delegated authority from a flag state administration to survey ships and certify that they comply with the relevant international conventions.
38 From its construction until 1 January 2016 Finnmaster was classed by DNV, which also undertook the statutory survey and certification of the ship as an RO acting for Finland. When Finnlines took Finnmaster into management on January 2016, it transferred the classification and statutory certification of the ship to RINA. The RINA rules set out the general requirements for the installation of flexible hose assemblies on ships classed by RINA36 and included, inter alia:
Flexible hoses are to be so arranged as to be clearly visible and readily accessible at all times.
In general, flexible hoses and expansion joints are to be limited to a length necessary to provide for relative movement between fixed and flexibly mounted items of machinery/equipment or systems.
The number of flexible hoses and expansion joints is to be kept to a minimum.
Where flexible hoses and expansion joints are intended to be used in piping systems conveying flammable fluids that are in close proximity to heated surfaces, the risk of ignition due to failure of the hose assembly and subsequent release of fluids is to be mitigated as far as practicable by the use of screens or other similar protection to the satisfaction of the Society.
The installation of flexible hose assemblies and expansion joints is to be in accordance with the Manufacturer’s instructions and use limitations… Other guidance on the use of flexible hose assemblies The manufacturer of the flexible hose used in the fuel flexible hose assemblies installed on board Finnmaster did not set out specific requirements for the replacement interval for its flexible hoses but did provide generic guidance37 that: Specific replacement intervals must be considered based on previous service life, government or industry recommendations, or when failures could result in unacceptable downtime, damage, or injury risk; and that: even with proper selection and installation, hose life may be significantly reduced without a continuing maintenance program. [sic] The safety guide further required that a maintenance programme must be established and followed, to include, as a minimum, visual inspections, a function test and replacement schedule consideration. Aside from the guidance available from the hose manufacturer, general guidance on the installation and care of flexible hose installations was available from a wide range of sources38. The guidance supplemented that contained in IMO MSC/ Circ.647 and the later MSC.1/Circ.1321. 36 RINA rules Part C, Chapter 1, Section 10, Paragraph 5.9.3 37 Alfagomma safety guide: Basic Factors for the Selection, Installation and Maintenance of Hose and Hose Assemblies. 38 DNV-GL Technical and Regulatory News No. 08/2016 – Enhancing Fire Safety Awareness; UK Offshore Operators Association – Flexible Hose Management Guidelines, 2003.
39 In 2017, the United States Coast Guard (USCG) issued a safety alert39 (Annex A), highlighting the risks associated with the degradation and failure of flexible hose assemblies carrying flammable liquids. Protection of hot surfaces In July 1994, the IMO adopted amendments to SOLAS Chapter II-2. The amended regulations required all surfaces above 220°C that may be impinged as a result of a fuel system failure to be insulated. Following the adoption by IMO of retrospective application of these requirements in 2000, Finnmaster was required to install such protection from 1 July 2003. 1.7.12 Similar accidents involving machinery maintenance Stena Europe – engine room fire On 11 February 2023, a fire broke out on the UK registered ro-ro passenger ferry Stena Europe, resulting in significant damage to the engine room (MAIB report 20/202440). The fire was caused by fuel leaking under pressure from the fuel system of a main engine and igniting on a hot exhaust. The Maritime and Coastguard Agency (MCA) was recommended to submit a paper to the IMO proposing an amendment to MSC.1/Circ.1321 to introduce a requirement for the use of thermographic equipment to identify hot surfaces exceeding 220°C that could be impinged by pressurised oil. The ferry’s operator, Stena Line Ltd, was recommended to: 2024/171 Review the use of the existing defect reporting functions within the PMS on vessels within its fleet to ensure that defect reports and remedial actions can be tracked readily; and 2024/172 Review and provide training to improve how its chief engineers conduct class-related equipment inspections that are credited to class surveys to ensure that inspections are conducted thoroughly and reported accurately. Finlandia Seaways – engine failure and fire On 16 April 2018, the Lithuania registered ro-ro cargo ship Finlandia Seaways suffered a catastrophic main engine failure that caused serious structural damage to the engine and a fire in the engine room (MAIB report 2/202141). The factors contributing to the engine failure included the standard of maintenance management; a lack of appreciation of the importance of following the engine manufacturer’s instructions; and external oversight of the engine maintenance process. 39 USCG Marine Safety Alert 06-17, dated 6 June 2017. 40 https://www.gov.uk/maib-reports/engine-room-fire-on-board-ro-ro-passenger-ferry-stena-europe 41 https://www.gov.uk/maib-reports/engine-failure-and-subsequent-fire-on-ro-ro-cargo-vessel-finlandia- seaways-with-1-person-injured
40 The investigation report also highlighted oversight of surveys conducted by chief engineers as an issue. This resulted in Finlandia Seaways’ classification society updating its guidance on the examination by chief engineers of surveyable machinery items, and a recommendation to the ship’s operator to: 2021/102 review and improve how its chief engineers conduct classification- related equipment examinations as part of the Continuous Survey Machinery cycle to ensure that examinations are conducted thoroughly and reported accurately. The report also recommended the engine servicing company to: 2021/103 Fully apply equipment manufacturers’ maintenance and repair guidance and procedures; and 2021/105 Review and update staff training to ensure familiarity with engineering methods appropriate for the various repair and overhaul tasks, backed up with a suitable quality assurance process to ensure standards are maintained. Wight Sky – two catastrophic engine failures The MAIB investigation into multiple engine failures on the ro-ro passenger ferry Wight Sky in 2018 (MAIB report 4/202242) identified the management of maintenance, oversight of service technicians and effective communication with the engine manufacturer as safety issues directly contributing to the engine failures. The report stated that the classification society’s delivery of robust classification and statutory services, as well as its ability to offer sound technical advice to the operator, was impacted by weak levels of communication between the engine manufacturer, its authorised service centre, and the ferry operator. It also noted that If the engine manufacturer had been consulted about the engine block repairs, it would have had a greater understanding of the ongoing issues, and this would almost certainly have prompted higher level technical investigations. Pride of Canterbury – engine room fire On 29 September 2014, a fire broke out in the engine room of the ro-ro passenger ferry Pride of Canterbury (MAIB report 22/201543). The investigation highlighted the importance of applying the contents of MSC.1/Circ.1321 to prevent engine room fires, specifically the shielding of high temperature surfaces from flammable oils. 42 https://www.gov.uk/maib-reports/two-catastrophic-engine-failures-one-resulting-in-a-fire-on-board-ro-ro- passenger-ferry-wight-sky 43 https://www.gov.uk/maib-reports/fire-in-engine-room-on-ro-ro-passenger-ferry-pride-of-canterbury
41 1.8 FIXED CARBON DIOXIDE FIRE-EXTINGUISHING SYSTEM 1.8.1 Description At the time of Finnmaster‘s build, SOLAS required the installation of a fixed firefighting system in category A44 machinery spaces. The SOLAS requirements for a CO2 system stated that the quantity of CO2 was to be sufficient to give a minimum volume of free gas45 equal to the larger of either: 40% of the gross volume of the largest machinery space so protected46; or 35% percent of the gross volume of the largest machinery space protected, including the casing. The volume of CO2 required for cargo holds was 45% of the gross volume of the individual spaces. A high-pressure CO2 system was installed to extinguish fires in Finnmaster’s engine room and the two internal cargo spaces. Activation of the system would release a set quantity of CO2 through nozzles in a network of distribution pipes installed throughout the protected space. The injected CO2 would displace the air in the compartment and the consequential reduction in oxygen in the atmosphere would extinguish the fire. A single nozzle was positioned in the AER at deckhead level between the two auxiliary engines. The CO2 system on Finnmaster had been approved by the Finnish Maritime Administration47 in October 1997. The machinery spaces on Finnmaster had a calculated volume of 3,010m³ including the AER, which was common with the engine room, and the casing. The design quantity of CO2 to be injected into the engine room was 1,890kg, equating to a free volume of 1,058m³ at the design concentration of 0.56m³/kg. The CO2 system (Figure 19) comprised 268 steel cylinders, each holding 45kg of CO2. This volume of gas was sufficient to extinguish a fire in the upper cargo hold, the largest protected space on Finnmaster. The cylinders were stowed in a CO2 room at the forward end of the main deck, accessed from a central alleyway leading from the main cargo deck to the forward crew stairway (see Figure 2). The CO2 room was ventilated by two dedicated fans; a supply fan and an exhaust fan. These fans provided a flow of air through the space to minimise the risk to people from any accumulation of leaked CO2. An instruction at the entrance to the compartment required the fans to be running when the space was occupied. The CO2 system was activated by pressurising a pilot system consisting of a series of small-bore flexible pilot hoses connected to the discharge valves on the top of each cylinder. The pressure to activate the system was provided from one of two pilot CO2 cylinders at the release station. Pressure in the pilot system would act on 44 Defined as spaces and trunks that contain internal combustion machinery used for main propulsion; or other internal combustion machinery with an aggregate power of more than 375kW; or any oil-fired boiler or oil fuel unit. 45 For the purpose of the calculation, the volume of CO2 was calculated at 0.56 m³/kg. 46 Excluding that part of the casing above the level at which the horizontal area of the casing is 40% or less of the horizontal area of the space concerned taken midway between the tank top and the lowest part of the casing. 47 A forerunner of TRAFICOM.
42 Figure 19: Finnmaster CO2 system schematic drawing The CO2 cylinders are represe nted as 268 colour-coded circ les arranged, from top to bottom, as three banks of three rows. The co rresponding legend identifies the top two rows of 45 grey circle s as manually activated cylinde rs. Row 3 of 45 green cylind ers and row 4 of 33 green c y l i n ders serve the up per cargo hold. Row 5 of 33 blue cylinders, plus another 25 i n row 6, serves the lower carg o hold. T he eight r ed cyl inde rs i n ro w 6 serv e th e en gine roo m. Row s 7 to 9 c omprise 34 red cylinders .
Activat ion signal pipes colour-matched to the corresponding CO2 cylinders join into the pilot lines connected to the main cylinder discharge valves.
Thick black lines connected to the main cylinders represent the common discharge manifold and lead to three section valves shown with actuation cylinders, which have small booster valves connected to the main cylinder discharge valves by colour-coded lines corresponding to the space they serve. The cargo hold booster signal enters the pilot activation pipework at the same end as the signal from the booster valves. The booster signal for the engine room system enters the system at the opposite end. For illustrative purposes only: not to scale
43 a piston in the cylinder discharge valve and open it to allow the cylinder contents to pass into a common discharge manifold, from where it would flow into the assigned distribution network through one of three section valves. The number of cylinder valves opened by the pressure in the pilot system depended on which of three control cabinet valves for the protected spaces were opened when the system was activated. For a fire in the upper cargo hold, the system was configured for the automatic release of 179 cylinders48 For a fire in the lower cargo hold, the system would release 10049 cylinders, and for an engine room fire the system would release 42 cylinders50. The cylinders assigned for the lower cargo hold and engine room were subsets of those allocated to the upper cargo hold. The amount of CO2 discharged could be supplemented by the manual release of CO2 from a reserve of 89 cylinders connected to the common discharge manifold. The release instructions reflected this provision, and manual release handles were placed in a rack on the bulkhead of the CO2 room for this purpose. 1.8.2 System operation The system operating instructions for both local and remote activation of the CO2 system on Finnmaster required a check that all personnel were confirmed as being evacuated from the protected space and the closure of all openings to the protected space before the system was activated (Figure 20). 48 CO2 cylinder references shown in the figures in this report reflect the cylinder numbers on the original Unitor drawing: 8164/5/6-02 – CO2 Room Arrangement. 49 Numbered C169 to C268. 50 Numbered C227 to C268. Figure 20: Extract from CO2 system operating instructions posted in CO2 room A set of CO2 system release instructions to follow in case of a fire in the engine room. The six steps are printed in upper case and list the sequential actions to take, from activating the CO2 alarm and preparing the protected space to operating the CO2 system.
44 The CO2 system was operated from a remote station in the main fire locker (Figure 21) on the weather deck. A supply cabinet contained the two pilot cylinders, each holding 1.8kg of CO2. Three release cabinets were installed adjacent to the supply cabinet, one for each protected space. When the relevant release cabinet door was opened, the ventilation fans for that space automatically stopped, the automatic ventilation dampers closed, and alarms sounded to warn personnel that CO2 was about to be released. The system was activated by opening both valves in the release cabinet for the affected space and one pilot cylinder in the supply cabinet. One of the two release cabinet valves led to a booster valve on the main outlet discharge manifold. The second valve led to one of three time delay units set below the release cabinet. A 6mm pipe from the time delay unit led to the CO2 room, where it connected to the series of flexible pilot hoses linking the individual cylinder valves together. Non-return valves fitted in specific positions in the pilot system controlled the number of cylinders activated when pressure was applied from the release cabinets. The operation of the booster valve allowed CO2 from the common discharge manifold, once pressurised by the discharging cylinders, to open the section valve leading to the protected space. It also directed additional CO2 from the common discharge manifold into the pilot system to boost the pressure and assist in the rapid activation of the cylinder valves. The booster connections for the cargo hold pilot systems were connected at the entry point for the timed pilot signals from the release cabinets. The booster connection for the engine room was connected at the opposite end of the pilot system pipework. The control system could be activated manually from the CO2 compartment if necessary. To extinguish the fire in the AER, the C/E followed the instructions provided at the release station on the weather deck to activate the high-pressure CO2 system, opening both valves in the release cabinet for the engine room and the valve on the forward pilot cylinder in the supply cabinet. After an automatic delay of 30 seconds, controlled by the time delay unit incorporated into the pilot system, the main system activated and injected CO2 into the engine room. The system was designed to empty the contents of 42 cylinders into the engine room. View towards three closed red cabinets mounted to a bulkhead. The nearest is the engine room release cabinet. Three small grey boxes mounted beneath the units are annotated as CO2 release time delay units. The door to a larger cabinet mounted to the right of the release cabinets is open. Looking into a large open cabinet mounted to the right of the three release cabinets. This cabinet is annotated as the CO2 system supply cabinet and contains two upright CO2 system pilot cylinders. Small pipes connect the valve on top of each cylinder to a single pressure gauge that reads zero. Figure 21: Main fire locker CO2 release cabinets Engine room release cabinet CO2 release time delay units CO2 system supply cabinet CO2 system pilot cylinders
45 1.8.3 Post-fire inspections On board inspection Finnmaster’s high-pressure CO2 system was examined during the investigation, supported by a technician from a specialist servicing company. In the CO2 room, the section valve to the engine room was found closed, having been shut by Finnmaster‘s crew following the fire. The associated booster valve was in the open position. The booster valves for the cargo holds were closed and had their safety pins installed, preventing their inadvertent operation. Of the 42 main cylinders intended to discharge their contents into the engine room when activated, the inspection found 21 with their discharge valves in the open position51. The pilot system pipe leading from the time delay unit below the engine room release cabinet in the main fire locker was found to be connected to the pilot pipework at cylinder C268. The pilot system pipe leading from the engine room booster valve was found to be connected to the pilot pipework at cylinder C227. This was the reverse of that contained in the original plan of the system. A test of the pilot system was carried out with the main cylinder discharge hoses disconnected and their cylinder discharge connections capped52. Significant gas leakage was observed from 12 of the pilot hose connections53 when the system was pressurised with CO2. This leakage was sufficient to prevent the operation of all of the cylinder valves. Additionally, the test revealed a lack of flow through the system in three positions54. Removal of the flexible hose assemblies in these positions showed them to be blocked. The system defects were found in both the engine room and cargo hold systems (Figure 22 and Figure 23). The activation and booster pipework from the release stations through to the point the pipes connected to the pilot system in the CO2 room were proved free from blockage. The discharged CO2 cylinders were refilled following the initial tests of the engine room CO2 system. The identified gas leakages in the pilot system were repaired and the blocked flexible pilot hose assemblies were replaced. A full test of the system was carried out on completion of the remedial work, during which all the cylinder valves operated satisfactorily when the pilot system was pressurised from the remote release station in the main fire locker. Flexible pilot hose assembly examinations The three blocked flexible pilot hose assemblies were removed from Finnmaster and subjected to radiographic examination, which indicated blockage at the end couplings (Figure 24). 51 Cylinders C227 to C241, C262, C263, and C268 to C265. 52 This was done as a precaution against accidental release of CO2. 53 At cylinders C131, C152, C165, C175, C177, C181, C197, C207, C209, C224, C227 and C268. 54 Between cylinders C215 and C216; C207 and C208; C241 and C242,
46 Sche mati c di agra m depicts 21 red an d 21 grey shaded circ les. The corresponding legend identifies the red shaded cy linders as those that opened duri ng the system’s activation and the grey sha ded ones as those that did not. A wavy purple arrow at open C227 and open C268 denotes significant gas leakage. A thick black curve between open C241 and closed C242 denotes a blocked flexible hose assembly. Figure 22: Identified faults in CO2 pilot system serving Finnmaster's engine room Longitudinal view along three rows of grey cylinders. Labels with arrows identify the vertical cylinder discharge valve positions as open along the left-hand row, starting at C235, and the horizontal positions for those along the middle row, finishing at C255, as closed. Open cylinder valves C235 C255 From lower cargo hold pilot system Engine room booster signal input Engine room activation signal inlet Closed cylinder valves For illustrative purposes only: not to scale
47 Figure 23: Identified faults in CO2 pilot system serving Finnmaster's cargo holds Sche matic diagr am depicts CO2 cylinde rs a llo cat ed t o th e up per hold as green shaded circles and those for the lower c argo hold as blue shaded circl es. A wavy purple arrow emanating from three cylinders in the uppe r cargo hold and seven cylinders in the lower ca rgo hold den otes where minor gas leakage has occ urred. A thi ck black curve be tween lower cargo hold cylinders C207 and C208 and C215 and C216 denotes a blocked flexible hose assembly. For illustrative purposes only: not to scale
48 The flexible hose assembly from between cylinders C241 and C242 in the AER’s pilot hose system was subsequently sectioned to fully investigate the blockage identified in the radiographs. The section revealed that the 4mm bore through the pilot hose coupling had not been fully drilled during manufacture, preventing the passage of gas through the flexible hose assembly (Figure 25). Figure 24: Pilot flexible hose assembly radiographic images Pilot flexible hose assembly between cylinders C207 and C208 Pilot flexible hose assembly between cylinders C215 and C216 Pilot flexible hose assembly between cylinders C241 and C242 Radiograph of failed flexible hose assembly between cylinders C207 and C208, showing the end coupling at each end of a wire braid. Radiograph of failed flexible hose assembly between cylinders C215 and C216, showing the end coupling at each end of a wire braid. Radiograph of failed flexible hose assembly between cylinders C241 and C242, showing the end coupling at each end of a wire braid. Radiograph close-up of right-hand end coupling, showing where the braid is crimped into the bored central stem and the ridged outlines of the threaded securing nut. The bore is incomplete by measured length of 10.3mm. Radiograph close-up of right-hand end coupling, showing where the braid is crimped into the bored central stem and the ridged outlines of the threaded securing nut. The bore is incomplete by measured length of 10.6mm. Radiograph close-up of right-hand end coupling, showing where the braid is crimped into the bored central stem and the ridged outlines of the threaded securing nut. The bore is incomplete by measured length of 11.1mm. 10.6mm 11.1mm 10.3mm Images courtesy of Inidam Ltd Figure 25: Section through flexible hose assembly coupling between cylinders C241 and C242 Looking down onto a metal hose coupling cut in half lengthways and laid horizontally on a wooden surface. The halved coupling has channels from each end of the central stem but solid metal at its centre. Nut Ferrule Stem
49 1.8.4 Onboard maintenance information The PMS set out the routine maintenance of the CO2 system, including tasks to be undertaken at 4-monthly intervals; after dry-docking of the ship; and annually to check the cylinder contents. The 4-monthly checks included an inspection of the CO2 release station; a test of the alarm and ventilation fan shutdown functions; an inspection of the seals and fastening assemblies for the CO2 cylinders; and a manual check of the section control valves. While it did not set a frequency for when tests were to be completed, the instruction manual initially supplied to Finnmaster provided an outline procedure55 for testing the CO2 system to enable verification of the pilot system’s integrity and completeness. The test entailed locking the individual discharge valves on the main cylinders in the closed position, except for the valve that was furthest from the pilot system activation signal inlet from the release cabinet. The discharge hose from the last CO2 cylinder would be disconnected, and a cap fitted to prevent accidental CO2 release. The activation of the release mechanism would then pressurise the pilot system throughout its length and the cylinder discharge valve at the furthest point would operate. The entire pilot system would be under pressure during the test and the system could be inspected for leakage. 1.8.5 Service history Maintenance of all the high-pressure CO2 systems on Finnmaster was carried out by the marine fire service division of Viking Life-Saving Equipment Oy Finland (Viking), latterly under a service agreement with Finnlines made in October 2018. The service agreement set out the commercial arrangement for the services provided by Viking to the Finnlines fleet. It incorporated annual or biannual services on each ship and included the main and local fixed high-pressure CO2 systems; portable fire extinguishers; CABA, and other firefighting equipment. The service procedures used by Viking service technicians to service the CO2 system on Finnmaster were aligned with the framework contained in MSC.1/ Circ.1318 – Guidelines for the Maintenance and Inspections of Fixed Carbon Dioxide Fire-extinguishing Systems (Annex B). The service manual available to the Viking service technicians was produced for a later CO2 system than that installed on Finnmaster, though the system was of the same type. This later version of the document56 detailed a different system test procedure to that contained in the earlier manual on board Finnmaster. It included a full test of all the cylinder valves with their outlets fitted with a blanking cap to prevent the release of any gas during the test. This test dispensed with the need to fit safety pins to the release valves attached to the CO2 cylinders as set out in the manual held on board Finnmaster and ensured that all cylinder valves operated when the pilot system was pressurised. 55 Unitor Document 50-00-999-4-E (September 1990) – Description of inspection chart Unitor high pressure CO2 system, page 7. 56 WuChang Shipyard, Hull A169M: Document 50-00-999-4-E (Revision 3, dated May 2002).
50 The Viking records for each service completed on Finnmaster’s CO2 system stated that the cylinder fixtures and HP hose connections had been checked and re-tightened [sic]. An entry also stated that the servo tubing/pilot lines were pressure tested and checked for leakage and blockage. The service completed at the renewal survey in June 2018 was recorded as having met the standard contained in section 6.1 of MSC.1/Circ.1318, indicating also that the cylinder valves had been inspected but not tested. The records for the service completed in March 2021 stated that the cylinder valves had undergone a release test, which would be included in a service completed to the standard of a renewal survey. It was unclear how Finnmaster‘s CO2 system test was completed during the last service. The test was reported both as a full test of the cylinder valve activation with the discharge hoses disconnected and caps installed to the cylinder discharge outlets, and as having been carried out with the cylinder valve safety pins installed and no activation of the cylinder valves. None of the inspected service reports indicated any defects in the CO2 system on Finnmaster. The report of the service carried out in March 2021 did not identify any blockage or leakage of the pilot system, either at the time of installation of the flexible pilot hoses or during the tests conducted as part of the service procedure. On completion of the service in March 2021, Viking issued a certificate of inspection to Finnmaster stating that, along with other firefighting systems, the main CO2 system had been inspected/checked in accordance to the design specification and performed service [sic] and noted that where repair and/or replacements had been completed as recommended the details would be recorded in the report. There was little crew oversight of the activities of the technicians from Viking, who were viewed as being the competent authority for the work. RINA surveyors did not perform any CO2 system surveys during the service activities carried out in March 2021. 1.8.6 Flexible hose replacement The checklists completed by the Viking technicians in 2018, 2019 and 2020 all noted that the high-pressure flexible hose assemblies had last been replaced in 2010. In July 2020, both the discharge and flexible pilot hose assemblies on the CO2 system were renewed. The flexible pilot hose assemblies were drawn from a stock of 220 purchased in the Netherlands by Viking Life-Saving Equipment B.V. (Viking LSE) from Geeve Hydraulics B.V. (Geeve), a wholesaler of hydraulic hoses and components located in Rotterdam. The flexible pilot hoses were accompanied by a test certificate issued by Geeve that provided technical details of the flexible hose assemblies supplied and the approvals held. Finnmaster’s crew noted cracking on the exterior of some of the flexible hose assemblies during later routine inspections of the CO2 system. It was agreed that Viking technicians would replace these assemblies under guarantee at their next attendance. In February 2021, Viking LSE purchased a further 60 flexible hose assemblies from Geeve. These were delivered to Finland accompanied once again by a Geeve test certificate.
51 On 4 March 2021, the defective flexible hose assemblies were replaced in conjunction with the 5-yearly service of Finnmaster’s CO2 system. The replacement flexible hose assemblies had identical markings to those previously installed, indicating a production date of July 2020. It has not been possible to determine whether the defective flexible hose assemblies identified following the fire were installed at the July 2020 renewal of the flexible hose assemblies or during the later change. 1.8.7 Flexible hose procurement and production The flexible hose assemblies supplied to Viking and subsequently installed on Finnmaster were produced to order by Geeve and comprised a 300mm section of flexible hose with a carbon steel fitting at each end. The couplings were installed by means of a hydraulic crimp that compressed a ferrule onto the flexible hose against a central stem through which a 4mm bore had been drilled during manufacture. The flexible hose component of the flexible hose assemblies was produced by Parker Hannifin Manufacturing S.r.l. (Parker). The type 421SN flexible hose was made of synthetic rubber with one braid of wire reinforcement and had a nominal diameter of 6mm. It was designed in line with the EN 853 1SN standard57, manufactured to the type approvals held by Parker and marked with the hose trade name, Parker; the type designation; maximum working pressure; temperature range; and size. Parker held type approvals issued by both DNV and RINA for the manufacture of flexible hoses of non-metallic material with permanently fitted couplings of type 421SN. The couplings fitted at either end of Finnmaster’s flexible hose assemblies were neither supplied by Parker nor contained in the Parker 48 series range of couplings, which was contrary to a requirement stated in the type approvals. Geeve placed orders for the couplings through HSR Hydraulics BV (HSR), a local hydraulics procurement provider that sourced its stock of the couplings from a manufacturer in China based on a specification provided to them by Geeve. Neither HSR nor its supplier were informed that the flexible hose assemblies the couplings were to be fitted to needed to be type approved. 1.8.8 Flexible hose assembly delivery certification A sample of the flexible hose assemblies were subject to a hydraulic pressure test when Geeve had completed their manufacture. The practice in the Geeve workshop was to test up to 20% of the hose assemblies by applying 1.5 times the working pressure58, either individually or by connecting a number of hose assemblies together in a series with the end assembly blanked. No test for blockage was carried out. The initial supply of 220 flexible hose assemblies to Viking LSE on 2 July 2020 was supplemented by a Geeve test certificate (Annex C). The certificate stated that the flexible hose assemblies complied with DNV type approval certificate number TAP000013G (Annex D). 57 European Standard EN 853:2015 Rubber hoses and hose assemblies – Wire braid reinforced hydraulic type – Specification. 58 The flexible hose assemblies used were rated to a working pressure of 225 bar.
52 The later supply of 60 flexible hose assemblies was also supplemented by a Geeve test certificate (Annex E). The certificate indicated that the flexible hose standard was the same as that previously supplied but referenced DNV type approval certificate number TAP00001JV (Annex F). The Geeve hose test certificates supplied with the flexible hose assemblies indicated that the batch supplied in July 2020 were tested to 450 bar (twice the working pressure) and those supplied in February 2021 were tested to 340 bar (1.5 times the working pressure). 1.8.9 Flexible hose assembly approvals The DNV type approval class programme for Flexible hoses – Non-metallic materials (DNV-CP-0183) set out specific requirements for the type approval of CO2 flexible hose assemblies made of synthetic rubber. This class programme provided a description of the procedures and requirements related to the documentation, design and testing applicable for the type approval of flexible non-metallic flexible hoses with permanently fitted couplings and rubber compensators. DNV type approval certificate TAP000013G The DNV type approval certificate TAP000013G was issued on 28 December 2017 and was valid until 27 December 2022. The applications detailed in the certificate indicated that the flexible hose assemblies were suitable for use with Petroleum base hydraulic fluids, water glycol and water oil emulsion hydraulic fluids, compressed air & fresh water. The application to CO2 systems was not included. The type approvals required Parker 48 series couplings to be fitted at either end of the flexible hose assemblies. The type approval certificate required each flexible hose assembly to be hydraulic pressure tested to 1.5 times the maximum working pressure, and to be delivered with a pressure test certificate referencing this type approval certificate number. Each flexible hose assembly was required to be marked with the manufacturer’s name or trademark, the type designation, maximum working pressure and size. DNV type approval certificate TAP00001JV The DNV type approval certificate TAP00001JV revision 1 was issued on 9 September 2020 and was valid to 21 April 2025. This certificate covered the same approval requirements as the TAP000013G type approval, but specifically approved the flexible hose assemblies for use in CO2 fire-extinguishing systems. RINA flexible hose approvals A RINA type approval for the type 421SN flexible hose produced by Parker was available for the flexible hose assemblies installed on Finnmaster. The RINA type approval certificate (Annex G)59 for the production of the initial 220 flexible hose assemblies supplied by Geeve in July 2020 was renewed in November 2020 (Annex H)60. The new certificate was valid until November 2025. 59 RINA Type approval certificate MAC176015CS/004, valid from 24 July 2015 to 23 July 2020. 60 RINA Type approval certificate MAC241320CS/002, valid until 22 November 2025.
53 The field of application detailed in the RINA certificates indicated the flexible hose assemblies were suitable for Hydraulic systems with a hydraulic oil having a flash point not less than 150°C. Neither certificate referred to the use of the flexible hose assemblies for pressurised gases nor their suitability for use in CO2 systems. The type approvals required Parker 48 series couplings to be fitted at either end of the flexible hose assemblies. The acceptance of the flexible hose assemblies for installation on RINA classed ships was subject to the satisfactory outcome of testing as per RINA Rules. The RINA rule requirement for testing stated that: Each flexible hose or expansion joint, together with its connections, is to undergo a hydrostatic test under a pressure at least equal to 1,5 times the maximum service pressure. [sic] During the test, the flexible hose or expansion joint is to be repeatedly deformed from its geometrical axis. 1.8.10 Flexible hose assembly production oversight RINA had no oversight of the production process of the flexible hose assemblies produced by Geeve and installed on Finnmaster by Viking. Geeve did not hold a certificate indicating that it was approved by RINA for the manufacture of flexible hose assemblies. Both of the flexible hose test certificates issued by Geeve contained an entry that the flexible hose assemblies had been tested in accordance with the DNV rules and met the specified requirements of the approval of manufacturer certificate (Annex I)61. The approval of manufacturer certificate issued to Geeve by DNV certified that the company was approved for the assembling of type approved flexible hoses and couplings for delivery to DNV ships. The certificate set out the type and size of individual flexible hose assemblies and the associated DNV conditions of approval. The DNV type approval procedure contained in the DNV-CP-0183 class programme specifically allowed for an approved flexible hose assembly to be manufactured by a company other than the component manufacturer using appropriate components. As Geeve was not the holder of the relevant type approval certificates the class programme required it to be approved by DNV as a manufacturer of the flexible hose assemblies. DNV maintained a separate class programme to cater for the approval of manufacturers of flexible hose assemblies that were not the component manufacturers62. To be issued with a DNV approval of manufacturer certificate a document review and site survey, including review of the production and testing facilities, was required. The class programme stated that, during the survey, Focus will normally be given to quality control of critical production steps, and that manufacturing, testing and inspection facilities are available and supervised/ operated by qualified personnel. 61 DNV-GL certificate AMT0000051. 62 DNV class programme CP-0346 – Approval of manufacturer scheme.
54 The initial survey of Geeve was conducted by DNV in May 2017 and the checklist completed at the time indicated that the company met all the requirements for the issue of the approval of manufacturer certificate without remark. A renewal survey was carried out in June 2020, again without comment, and the certificate was reissued. The approval of manufacturer certificate class programme contained a requirement that Any significant alteration to the approved condition during the period of validity… shall be reported to the Society. No report was made by Geeve to DNV reflecting the change of supplier of the flexible hose assembly couplings. On 26 April 2022, following the highlighting of issues with the manufacture of flexible hose assemblies by Geeve63, DNV completed an additional survey of the company. This activity was carried out to the standard of an initial approval. The checklist used for the onsite inspection contained 18 items to be verified as part of an initial survey. Of the 11 items marked as having been completed on the checklist, seven indicated noncompliance with the requirements. The remarks section of the report recorded shortcomings in quality management, testing procedures, and control of subcontractors and suppliers. The inspection was suspended before the remaining items were assessed. A remark on the checklist indicated that the outstanding items would be included in the scope of the next audit. DNV required corrective action by Geeve on the noted items before recertification for the production of flexible hose assemblies under the relevant class programme. Following corrective action by the company, the recertification process was completed by DNV in August 2023 and a new approval of manufacturer certificate issued to Geeve, valid until 7 August 2026. 1.8.11 Service supplier approval It was a requirement of MSC.1/Circ.1318 that technicians completing services of CO2 systems were trained to standards accepted by the administration, which in this case was TRAFICOM. Finnmaster was classed by RINA from 1 January 2016, which from this date carried out both the classification and statutory functions on behalf of TRAFICOM. The activities of RINA were governed by an agreement governing the delegation of statutory certification services for ships registered in Finland between the Finnish Transport and Communications Agency and RO, which was renewed on an annual basis. The appendix to the agreement set out the degree of authorisation held by RINA. It did not delegate the responsibility for the acceptance of training of technicians servicing CO2 systems. 63 MAIB Safety Bulletin 1/2022 https://www.gov.uk/maib-reports/safety-warning-issued-after-discovery-of- blocked-fixed-co2-fire-extinquishing-system-pilot-hoses
55 International Association of Classification Societies The IACS produced unified requirements for the rules and practices of its members, of which RINA was one. The IACS maintained a unified requirement on Procedural requirements for service suppliers64 (UR-Z17) for firms providing services, including the maintenance of safety systems and equipment. Section 3 of UR-Z17 defined a service supplier as: A person or company, not employed by an IACS Member, who at the request of an equipment manufacturer, shipyard, vessel’s owner or other client, acts in connection with inspection work and provides services for a ship or a mobile offshore unit such as measurements, tests or maintenance of safety systems and equipment, the results of which are used by surveyors in making decisions affecting classification or statutory certification and services. The unified requirement incorporated a wide range of services for statutory and non-statutory work. It included the approval of firms engaged in inspections and maintenance of fire extinguishing equipment and systems [sic] and set out the requirements for approval and certification. UR-Z17 required service suppliers to have professional knowledge of fire theory, firefighting and fire-extinguishing appliances sufficient to carry out maintenance and inspections, and documented procedures on how to carry out the servicing of the systems. These were to contain or refer to the manufacturer’s servicing manuals, servicing bulletins, instructions and training manuals as appropriate, and to international requirements. The unified requirement also required the service supplier to have access to type approval certificates, showing any conditions that may be appropriate during the servicing and/or maintenance of fire-extinguishing equipment and systems. RINA S.p.A RINA provided a framework for the approval of service suppliers covering the requirements set out in UR-Z17. The scope of the RINA rules for the certification of service suppliers included the approval of suppliers performing inspection and maintenance of fire-extinguishing equipment and systems contributing to statutory certification. The RINA rules stated that: Where such services are used by RINA Surveyors in making decisions affecting statutory certification and service, the firms are subject to approval and verification by RINA where RINA is so authorised by the relevant flag Administration (i.e. the flag of the ship on which the servicing is to be done or the service equipment is to be used). For such services RINA may accept approvals done by: a) the flag Administration itself; b) duly authorized organizations acting on behalf of the flag Administration; or c) other organizations acceptable to the flag Administration (e.g. other governments, etc.). 64 Revision 14 of UR-Z17, dated March 2020 and required to be implemented by member classification societies by 1 January 2020, was extant during the timeframe of the activities discussed in this report.
56 The rules further noted that: Firms providing services on behalf of the Interested Party, such as measurements, tests and servicing of safety systems and equipment, the results of which may form the basis for the surveyor’s decisions, are subject to the acceptance of the society, as deemed necessary.65 On spare parts used in the maintenance of the ship, the rules placed the responsibility for compliance on the shipping company, in that: …in the case of repairs or replacement, spare parts used are to meet the requirements of the Rules as far as practicable.66 RINA surveyors conducted statutory surveys on behalf of TRAFICOM under the agreement governing the delegation of statutory certification services. 1.8.12 Viking Life-Saving Equipment Oy Finland In March 2018, RINA approved Viking under the requirements of its rules for the certification of service suppliers for services being provided to ships classed by RINA. The services itemised on the certificate included firms engaged in inspections and maintenance of fire extinguishing equipment and systems [sic]. The certificate of approval expired on 7 March 2021. The subsequent certificate of approval issued by RINA was valid until 19 January 2025. Viking also held approvals issued under the IACS UR-Z17 procedures from Lloyd’s Register, DNV and the American Bureau of Shipping. Contributing to the approval under UR-Z17, the Viking group of companies maintained an internal audit programme within the group and provided a centralised training framework for staff undertaking servicing of firefighting equipment under a quality management system67 certified by DNV. The training provided by the Viking group at its facility in the Netherlands included that required for the servicing of high-pressure CO2 systems. The Viking quality management system procedures were all assessed as meeting the functional requirements for the approval. Though the quality management system of Viking formed part of the wider group system, the RINA approval of Viking for certification as a service supplier was based on audits conducted on Viking’s specific operation in Finland. The RINA approval was valid at the time of the service completed on board Finnmaster in March 2021. 1.8.13 Finnlines service supplier audit programme The Finnlines internal procedures required an audit of Viking’s operation as a supplier of services to the company. The last audit carried out by Finnlines in 2018 showed a focus on the commercial aspects of the relationship between the two 65 RINA Rules: Part A, Chapter 1 Section 1 - General principles of classification. Section 3.5 Use of measuring equipment and of service suppliers. 66 RINA Rules: Part A, Chapter 1 Section 1 - General principles of classification. Section 3.6 Use of measuring equipment and of service suppliers. 67 The Viking group held ISO 9001:2015 – International Organization for Standardization certification covering the design, development, manufacture, sale and service/maintenance of maritime liferafts, slides, evacuations systems, glass fibre reinforced polyester man overboard/rescue boats, personal protective and safety equipment. The system also covered the service of marine firefighting equipment, lifeboats, davits, release hook systems and personal protective equipment.
57 companies and recorded a need to take a proactive approach, arrange training for crew etc. [sic], but it was unclear to which organisation this was addressed. There was no evidence that specific training was requested from, or provided by, the Viking technicians. 1.8.14 Installation survey and oversight Survey requirements Chapter I of SOLAS68 required that Finnmaster was routinely surveyed for the issue, endorsement and renewal of the statutory certificates held. From 2016, the surveys were completed by RINA surveyors in line with RINA procedures. These procedures reflected the guidelines contained in IMO Resolution A.1140(31)69 – Survey Guidelines under the Harmonized System of Survey and Certification. Finnmaster held an SEC that was issued on 26 September 2018 and valid until 31 May 2023. SOLAS required a periodic survey to be completed instead of either the second or third annual survey for the endorsement of the SEC. The RINA rules required any repair resulting from maintenance and overhauls that affected or may affect the classification to be recorded and submitted to the attending surveyor for use in determining further survey requirements. Finnmaster surveys The SEC renewal survey for Finnmaster was conducted in June 2018 by a RINA surveyor. The fire safety systems and appliances were included in the survey, as well as other equipment set out in the IMO survey guidelines. Subsequent annual surveys conducted in May 2019 and June 2020 included a general inspection to ensure relevant equipment had been maintained in line with the provisions of the applicable regulations, and that the ship remained fit to proceed to sea. Although the SEC carried on board Finnmaster did not indicate which of the two surveys carried out in June 2020 and July 2021 met the standard of a periodic survey, the RINA survey records showed that it was completed in July 2021. Coincident with the surveys for statutory certificates, RINA also surveyed Finnmaster for the renewal, or endorsement as appropriate, of the certificate of classification in line with the RINA rules. Service records for the CO2 system, the test certificates for the flexible hose assemblies used in the system, and the certificate of approval for Viking as a service provider were all available on board Finnmaster at the periodic survey conducted in July 2021 for the endorsement of the SEC. It was reportedly uncommon for classification society surveyors to be present during the service of a CO2 system. 68 General Provisions – Part B – Surveys and Certificates – Regulation 8 – Surveys of life-saving appliances and other equipment of cargo ships. 69 Resolution A.1140(31) was adopted on 4 December 2019, replacing Resolution A.1120(30), and revoked itself in December 2021, when revised guidelines were adopted by Resolution A.1156(32).
58 1.8.15 Further regulation and guidance Maintenance of firefighting systems It was a requirement of SOLAS that firefighting systems and appliances be kept in good working order and readily available for immediate use. To achieve this, the convention expected that: maintenance, testing and inspections shall be carried out based on the guidelines developed by the organization and in a manner having due regard to ensuring the reliability of fire-fighting systems and appliances. SOLAS referenced IMO Circular MSC.1/Circ.1432 - Revised Guidelines for the Maintenance and Inspection of Fire Protection Systems and Appliances (MSC.1/ Circ.1432). These guidelines provided the minimum recommended level of maintenance and inspection for fire protection systems and appliances. On the maintenance and inspection specific to CO2 systems, MSC.1/Circ.1432 referenced IMO Circular MSC.1/Circ.131870. Maintenance and inspection of fixed carbon dioxide fire-extinguishing systems The maintenance scheme provided in MSC.1/Circ.1318 included monthly and annual inspection tasks that could be conducted by the ship’s crew. Section 6.1 of MSC.1/Circ.1318 covered the servicing to be carried out by service technicians at intermediate, periodic, or renewal surveys. The work included a test of the discharge piping to the protected spaces. Section 6.2 covered the additional servicing necessary at renewal surveys and included, among others:
- where possible, all activating heads should be removed from the cylinder
valves and tested for correct functioning by applying full working pressure through the pilot lines. In cases where this is not possible, pilot lines should be disconnected from the cylinder valves and blanked off or connected together and tested with full working pressure from the release station and checked for leakage. In both cases this should be carried out from one or more release stations when installed. If manual pull cables operate the remote release controls, they should be checked to verify the cables and corner pulleys are in good condition and freely move and do not require an excessive amount of travel to activate the system;
- all cable components should be cleaned and adjusted as necessary, and
the cable connectors should be properly tightened. If the remote release controls are operated by pneumatic pressure, the tubing should be checked for leakage, and the proper charge of the remote releasing station pilot gas cylinders should be verified. All controls and warning devices should function normally, and the time delay, if fitted should prevent the discharge of gas for the required time period; and
- after the completion of work, the system should be returned to service. [sic]
70 MSC.1/Circ.1318 Revision 1 was issued on 25 May 2021 to address the need to clarify the hydrostatic testing regime for high-pressure CO2 cylinders and align the relevant requirements with the revised guidelines contained in IMO Circular MSC.1/Circ.1432.
59 The appendix to the guidance provided a proforma example service chart to assist with monitoring the inspection and maintenance activities carried out on CO2 systems. Neither MSC.1/Circ.1318 nor the RINA classification rules contained any requirement for a CO2 system to be surveyed on completion of a service. The servicing records on board Finnmaster showed the servicing requirements at renewal and periodic surveys had been transposed. It could not be determined why. 1.8.16 Similar accidents involving fixed carbon dioxide fire-extinguishing systems Eddystone/Red Eagle – unintentional release In September 2018 the MAIB published its findings (MAIB report 16/201871) on investigations into the unintentional release of CO2 from fixed firefighting systems on board two ships: Eddystone on 8 June 2016; and Red Eagle on 17 July 2017. The report noted that: Flag administrations, classification societies, ship’s owners, operators and crew all rely on approved service suppliers to ensure that CO2 fixed fire-extinguishing systems are in a continuous state of readiness, by means of regular maintenance and testing. The report’s findings included that: The level of service given by approved service suppliers regularly fails to maintain the safety of CO2 based fixed fire-extinguishing systems on board ships. The report recommended to DNV and Lloyd’s Register that they: Propose to the International Association of Classification Societies that an investigation be carried out into the application of Procedural Requirements for Service Suppliers, UR-Z17. This should take into consideration the finding of this report, that the level of service provided by approved service suppliers regularly fails to maintain the safety of CO2 based fixed fire-extinguishing systems on ships. Lloyd’s Register submitted this recommendation to the IACS survey panel in September 2018. DNV recommended to IACS member classification societies that letters be sent by each classification society to its approved service suppliers, taking into consideration the conclusions from the report. DNV further requested that the system manufacturers issue an attention letter providing specific guidance for the specific manufactures/parts and include them to the notifications by each classification society to the service providers [sic]. DNV noted that discussions at IACS were ongoing in December 2019. 71 https://www.gov.uk/maib-reports/unintentional-release-of-carbon-dioxide-from-fixed-fire-extinguishing- systems-on-ro-ro-vessels-eddystone-and-red-eagle
60 The IACS unified requirement UR-Z17 was revised twice in the period between publication of the MAIB report in September 2018 and Viking’s service of Finnmaster in March 2021, with the second revision published but not coming into force until 1 July 2021. The two revisions did not update any general requirements for the assessment, approval or certification of service suppliers, or any specific requirements for the assessment of firms engaged in inspections and maintenance of fire-extinguishing equipment and systems. 1.9 ELECTRICAL SYSTEM FAILURE 1.9.1 Emergency power system failure On loss of power, the interconnector circuit breaker at the main switchboard opened, as did the contactor for the main switchboard supply at the emergency switchboard. The EDG started automatically as intended but its breaker did not close to allow the EDG to supply power to the emergency switchboard. 1.9.2 System loss due to power failure The lack of power to the emergency switchboard rendered the EDG radiator fan, emergency fire pump, CO2 room ventilation fans, and the supply to the 380/220VAC transformer inoperable. The loss of power to the 220VAC emergency distribution panels supplied from the emergency transformer meant that Finnmaster was in darkness with both main and emergency lighting supplies inoperative. The loss of the 220VAC to the bridge distribution panel meant that much of the bridge equipment was inoperative including:
● radars
● echo sounder
● navigation lights
● gyro compass. The Electronic Chart Display and Information System (ECDIS) and global positioning system were fitted with UPS so remained operational when the emergency power to the bridge was lost. Finnmaster’s voyage data recorder lost main power but remained operational during the accident as it was supplied by its own battery backup system. The UHF radio system repeater lost power, limiting the ability of the handheld UHF radios to receive or transmit messages. The UHF radios were inoperable in the machinery spaces. 1.9.3 EDG circuit breaker An initial examination of the EDG circuit breaker following the accident identified several areas of damage (Figure 26), including:
● signs of external heat damage to the left-hand side of the casing
61
● resistance-free movement of the motor module manual charging handle, which could not compress the charging spring
● burnt motor windings and signs of heat exposure to the adjacent gearing
● the plastic switch handle had snapped into four pieces.
● the pawl from the manual charging lever mechanism, along with a number of mechanical components, had fallen from the motor unit. The circuit breaker, motor module and damaged components were removed from Finnmaster. The circuit breaker manufacturer, Schneider Electric, was commissioned to carry out a detailed examination to determine the cause of the unit’s failure. The report (Annex J) indicated that the circuit breaker switch lever and the manual ratchet on the motor module had broken, and that the ratchet pawl had fallen into the mechanism of the circuit breaker switch. The plastic circuit breaker trip contact72 lever arm had also failed. The return spring from the ratchet pawl was not located during the investigation. The undervoltage relay operated correctly when tested in isolation, but operated intermittently when tested in conjunction with the UVT unit relay. Detailed examination of the of UVT unit showed that three soldered connections on the circuit board inside the unit were cracked. There was a lack of fusion in the soldered connection between the circuit board and the pins from the connector block where the input and output wires were connected. 72 Labelled as Trip contact (SD) in the Figure 6 circuit diagram. Figure 26: Damage to the EDG circuit breaker Looking towards blackened, melted motor winding components. Looking down onto a shaped piece of flat metal and a small metal bolt laid on a wooden surface. Looking down onto four broken pieces of a plastic switch handle arranged on a wooden surface. The indicator on the snapped top piece has a green ‘OFF’ marked on it. Looking towards the heat-distorted left-hand panel of an in situ plastic casing. Burnt motor windings Broken circuit breaker switch handle Heat damage to motor mechanism casing Detached manual handle pawl
62 1.9.4 EDG on board testing The EDG on board Finnmaster was subject to a routine test programme as part of the PMS that included:
● a monthly off-load test, i.e. without delivering power to the emergency switchboard;
● a 6-monthly load test with the EDG connected to the emergency switchboard;
● a yearly survey of the EDG’s operation carried out in the presence of a classification society surveyor at the ship’s annual survey. To test the EDG off-load, the engine would be started manually. The EDG circuit breaker would not close. In this mode the emergency switchboard would continue to be supplied from the main switchboard. A test switch was provided on Finnmaster to prove the operation of the EDG on load. When this switch was operated, the interconnector contactor would open so that the emergency switchboard lost power. The EDG would then start automatically, the EDG circuit breaker would close, and the EDG would provide power to the emergency switchboard. The procedures to be used for both the on-load and off-load tests were posted in the EDG room. The emergency switchboard was subject to a routine inspection by the on board electrician and a 5-yearly survey by a classification society surveyor. The last 6-monthly load test of the EDG had been completed on 24 April 2021. The record of this test indicated that the EDG was in good condition. Off-load tests of the EDG were recorded in the PMS at roughly monthly intervals in the 6 months before the fire. All of the PMS entries indicated that the test run of the EDG had been completed without any abnormalities being identified. The practice on board Finnmaster was to complete a weekly off-load test of the EDG, though this was not recorded in the PMS. A test had been competed about 6 hours before the fire. No records were identified that showed the EDG test schedule for Finnmaster before the ship was taken into management by Finnlines in January 2016. In May 2021, a RINA surveyor completed and examination of the EDG’s operation as part of the intermediate survey to credit Finnmaster’s safety construction certificate. The checklist for this survey contained an entry for confirmation, as far as practicable, of the operation of the emergency sources of power, including their starting arrangements, the systems supplied and, when appropriate, their automatic operation. The survey checklist indicated this had been carried out, though there was no record of the activity in Finnmaster’s PMS.
63 1.9.5 Regulation and guidance Testing emergency sources of power The SOLAS Convention Chapter II-1, Part D, Regulation 43 required that: Provision shall be made for the periodic testing of the complete emergency system and shall include the testing of automatic starting arrangements. The Convention did not specify the frequency of the periodic testing. On safety of navigation, SOLAS Chapter V, Regulation 26 required ships’ crews to test the emergency steering system every 3 months to include, where applicable, the operation of alternative power supplies. Internal communication equipment From 1 July 2018, amendments to SOLAS73 Chapter II-2 applicable to Finnmaster required the provision of a minimum of two two-way portable radiotelephone apparatus for each fire party for fire-fighter’s communication. This requirement was met by the UHF portable radios carried on board Finnmaster. The two-way portable radiotelephone apparatus was required to be explosion-proof or intrinsically safe but the IMO did not define performance standards or functional requirements for the equipment. SOLAS chapter III required the provision of an emergency means for two-way communications between emergency control stations, muster and embarkation stations and strategic positions on board. Reference information In 1998, the Marine Safety Agency (MSA)74 produced Marine Guidance Note (MGN) 52 (M+F) – Testing of Emergency Sources of Electrical Power. MGN 52 (M+F) applied to UK registered ships and stated that: Investigation into marine casualties has indicated that a number of incidents have occurred in which the emergency source of electrical power has not operated correctly following the loss of main power. The guidance served to remind those responsible for the operation of ships that: the Regulations required periodic testing of the complete emergency electrical system including any automatic starting arrangements. [sic] MGN 52 (M+F) recommended that tests of the emergency source of power be conducted with a load as near to the capacity of the generator as practicable and that these tests be incorporated into the ship’s weekly safety checks. 73 IMO Resolution MSC.338(91) – Adoption of Amendments to the International Convention for the Safety of Life at Sea, adopted 30 November 2012. 74 The MSA was responsible for implementing the UK government strategy for marine safety and prevention of pollution from ships. The MSA was amalgamated with Her Majesty’s Coastguard in 1998 to become the Maritime and Coastguard Agency (MCA). The MSA issued MGN 52 (M+F) shortly before this merger.
64 Port State Control inspections The Paris Memorandum of Understanding on Port State Control (Paris MoU) comprised 28 maritime administrations participating in a harmonised system of inspection75 for ships visiting ports in the region. In the 12 months before the fire on board Finnmaster, the emergency source of power was inoperable in 281 instances when tested as part of an inspection76. An inoperable emergency source of power contributed to the detention of 41 ships, which equated to 9.4% of the detentions recorded77. Finland safety study of power failures on ships In December 2017, the Safety Investigation Authority, Finland (SIAF) published Power Failures on Ships78. The safety study was conducted over a period of 12 months, starting in February 2016, during which ship accidents and incidents involving failures in the distribution of electricity were examined. Twelve cases were included in the investigation. The safety study noted anecdotal evidence of additional power failures on ships that were not reported to the authority. Of the 12 cases investigated as part of the safety study, the emergency source of power, where recorded, operated as intended in four cases and failed to operate as required in one case. The SIAF safety study reported that: Tests are done to detect deficiencies. It is of outmost importance to carefully test automation systems and all their functions, already when taking them into use. According to chapter 10.3 in the ISM Code, also systems that are not in continuous use must be tested in accordance with system-instructions and on a regular basis. Automation systems’ fast ageing is a problem. [sic] and; Deficiencies in the backup and emergency systems were found in all investigated cases. Failure situations, like serious power failures, are not always tested due to the risk of damaging the systems. According to chapter 10.3 of the ISM Code, a shipping company must design measures to ensure the reliability of systems whose failure may cause hazardous situations. According to the ISM Code, the measures must include testing of backup and emergency systems as well as of systems in non-continuous use. The testing must be done in accordance with the instructions for the test. [sic] 75 Port State Control inspections were a mechanism to verify compliance with statutory requirements through structured inspections of ships. 76 Inspectors had a degree of discretion over what areas were subject to detailed examination. The number of inspections where the emergency source of power was operationally tested was not available. 77 Data retrieved from the Paris MOU data sharing service https://parismou.org/ 78 Investigation number: M2016-S1 – Power Failures on Ships, ISBN: 978-951-836-507-8 (PDF). https://turvallisuustutkinta.fi/material/attachments/otkes/tutkintaselostukset/en/ vesiliikenneonnettomuuksientutkinta/2016/LgMHaYu9f/M2016-S1_Power_Failures_Safety_Study.pdf
65 1.10 EMERGENCY PROCEDURES 1.10.1 General The safety management system (SMS) used on Finnmaster provided procedures and training to enable the crew to respond to emergencies on board. 1.10.2 Muster list The muster list posted on Finnmaster set out the duties and actions to be taken by each crew member in the event of an emergency. At the time of the fire Finnmaster had a crew of 16, which exceeded the requirement of the minimum safe manning document. The muster list identified 14 emergency positions. There were two trainees on board who were not included on the muster list. 1.10.3 Emergency response procedures The training and fire training manual (training manual) on Finnmaster provided general guidance on fire safety practices and firefighting procedures, including the operation and use of firefighting systems and appliances and the operation and use of fire and smoke dampers. The training manual provided a general overview of fixed fire-extinguishing systems, with one section specific to the activation of Finnmaster’s high-pressure CO2 system that stated: It is usually only the ship’s chief engineer or his deputy who is permitted to discharge the CO2 system, at the Master’s order. The discharge process starts with the lid of the box containing the release being opened to activate the alarm. Personnel then wait until the areas have cooled down and the seat of the fire has been properly extinguished before any doors to the area are opened. When a fixed extinguishing system of the CO2 type is to be discharged, it is very important to check the following:
●That all personnel have left the area
●That all doors and fire dampers are closed Further, it stated that: in case of fire, all fire dampers must be closed. They prevent air (oxygen) from reaching the fire through ventilation channels. Finnmaster’s SMS contained two emergency procedures relevant to fires on board: one covering the actions to be taken in the event of a fire in port, and one for a fire at sea. There was no procedure covering a fire during pilotage as a separate activity. The procedure to respond to a fire at sea detailed actions to be taken by the watchman and bridge watchkeeper once a fire had been confirmed, including instructions for the bridge watchkeeper to: sound the alarm and inform the fire groups. Let the signal sound for 2-3 min;
66 ensure that fire doors and WT-doors79 are closed; stop the fans and ventilation at the scene of fire; and ensure that the fire dampers are closed at the scene of fire. The procedure then directed the crew to act in line with the muster list instructions, which placed responsibility on the C/E to decide what fire-extinguishing method to use. The procedure required one fire group to: go to the scene of the fire and start to extinguish it or prepare extinguishing equipment, evacuating and sealing off the area. The other fire group was directed to: meet at the fire station and put on the fireman’s outfits to prepare to fight and restrict the fire. [sic] The procedure further instructed the crew to consider evacuating passengers to the muster stations by making an announcement and sounding the general emergency alarm. It also provided advice on other response elements to consider, among others, the need to: pay attention to communication between the bridge and fire groups; the consideration of the use of the fixed firefighting installation; the closing of fuel quick closing valves80; energy supplies; and the analysis of risk. [sic] The procedure for a fire in port set out tasks to manage the crew and cargo operations and raise the alarm ashore, though this latter process involved the on-duty deck officer phoning the local fire brigade by calling 112; this was the emergency telephone number in Finland but not the UK. This procedure called for the preparation of the fire groups, the stopping of ventilation and the closure of the fire dampers. 1.10.4 On board emergency training Finnmaster’s SMS contained a programme of emergency preparedness exercises in compliance with SOLAS. The programme required a monthly full crew fire drill. The training manual suggested including elements such as knowledge of fire dampers, fire doors and watertight doors; function of means of communication; and knowledge of the CO2 system. Following each fire drill Finnmaster’s C/E completed a fire drill checklist that recorded the date, who had participated, and a description of the drill scenario or activity undertaken. Remarks were also made on the conduct of the drill. Finnmaster’s senior officers held a monthly shipboard management meeting. These meetings had a standard agenda item of safety and security in which notes on the conduct of the drills were recorded. In the 6 months before the fire the minutes from these meetings stated that all drills were OK. 79 Watertight doors. 80 Remotely operated valves – refer to section 1.6.10: Fuel system emergency shutdowns.
67 An internal ISM audit completed over two port calls in Finland in late 2020 and early 2021 did not include an operational drill due to the additional risks associated with the COVID-19 pandemic. The report completed in respect of the internal audit stated that drills had been completed in line with the SMS and were well recorded. A summary of the monthly fire drills conducted in the year before the fire, including which senior officers participated, is set out in Table 2. Date Location of simulated fire Details Master Chief officer C/E 1/E 13/10/2020 Paint store Use of local CO2 system/closure of fire dampers/use of boundary cooling X 23/11/2020 Sauna Electrical fire X X 30/12/2020 Galley CABA drill/use of local CO2 system X X 23/01/2021 Accommodation Fire in passenger cabin X 16/02/2021 Not applicable CABA instruction X X 17/03/2021 Accommodation Fire in passenger cabin X 13/04/2021 Incinerator room CABA drill/local CO2 system/ boundary cooling X X X 26/05/2021 Not applicable Fire station equipment and fire monitor instruction X X X X 29/06/2021 Not applicable Video – Engine Room Fires81 X 31/07/2021 Weather deck Container fire X X X X 14/08/2021 Not applicable Fire station equipment check X Table 2: Finnmaster crew fire drills completed between October 2020 and August 2021 Details of the drills that might have been undertaken by senior officers on other ships in the fleet during this timeframe were not examined. The Engine Room Fires video shown to the crew in June 2021 provided advice on the methods used to prevent fires in machinery spaces and guidance on the use of fixed installations for extinguishing fires in engine rooms. It highlighted the need to act quickly when faced with a small fire, noting that: because of the heat and smoke generated by an oil fire in the machinery space, fighting a fire with portable equipment would only be an option for a smaller fire, and only when the fuel had been successfully shut off. The video also included guidance on the operation of a CO2 system. It included: the closure of all openings to the machinery spaces; the closure of remotely operated fuel valves; and the need for a full muster of crew prior to the activation of the system. It also advised to allow time for structural cooling before considering opening up the engine room. 81 Videotel training module 2687: Machinery space fires.
68 1.10.5 Regulation and guidance The ISM Code Section 8 of the ISM Code required that the company identify potential emergency shipboard situations, establish emergency drill programmes and provide measures to respond to accidents and emergencies. It also required the company to ensure that ships were crewed with qualified, certificated and medically fit seafarers in accordance with national and international requirements. STCW training requirements STCW set out standards for the training and certification of seafarers. Chapter VI of the Convention provided the required standards for emergency, occupational safety, security, medical care and survival functions. The requirements for firefighting training were separated into three levels: Safety familiarisation82 – familiarisation training required for all seafarers on joining a ship before being assigned to shipboard duties. Fire prevention and firefighting83 – required for seafarers with designated safety or pollution prevention duties in the operation of the ship. This training included: Shipboard fire-fighting organization Fire-fighting equipment and its location on board Instruction in: .1 fixed installations .2 fire-fighter’s outfits .3 personal equipment .4 fire-fighting appliances and equipment .5 fire-fighting methods .6 fire-fighting agents .7 fire-fighting procedures .8 use of breathing apparatus for fighting fires and effecting rescues [sic] Training in advanced firefighting84 – required for seafarers designated to control firefighting operations. The minimum expected standard of competence for the advanced firefighting certificate of proficiency included knowledge of: Fire-fighting procedures at sea and in port, with particular emphasis on organization, tactics and command; 82 STCW A-VI/1-1. 83 STCW A-VI/1-2. 84 STCW A-VI/3.
69 Communication and coordination during fire-fighting operations; Ventilation control, including smoke extraction; Control of fuel and electrical systems; Strategies and tactics for control of fires in various parts of the ship; Fire-detection systems; fixed fire-extinguishing systems; portable and mobile fire-extinguishing equipment, including appliances, pumps and rescue, salvage, life-support, personal protective and communication equipment. [sic] The IMO produced a model course85 to support training establishments to meet the functional requirements of the STCW Code for advanced firefighting. The model course material identified the entry requirements and trainee target group in universally applicable terms and defined the skills necessary to meet the technical intent of the STCW Convention. To be issued with a certificate of proficiency, course participants had to be able to state that: communication and co-ordination during firefighting operations is two-fold, I.e. internal communication and co-ordination in the ship and external with the management representatives of owner, classification society and coastal states for external assistance. shore fire fighters must be informed in case of fire in port. Master and ship staff must take immediate action to control fire as per contingency plan till the shore fire fighters arrive. walkie-talkie and ship’s internal telephone systems are vital in developing internal communication in addition to direct communication by messengers. engine room ventilation flaps must be closed in case of engine room fire. And, state why shutting off fuel supply from settling tanks is essential in engine-room fires. [sic] The senior officers who managed the response to the fire on board Finnmaster on 19 September 2021 had all undertaken firefighting training to the advanced level. The SOLAS Convention SOLAS contained provisions intended to ensure that the crew were able to respond to emergencies on board. To restrict the potential for fires to grow once ignited, SOLAS Chapter II-2 included a requirement for the provision of means to:
● remotely stop fuel oil pumps
● remotely close the outlets from fuel tanks 85 IMO Model Course 2.03 – Advanced Training in Fire Fighting.
70
● control ventilation fans and openings in the boundaries of machinery spaces. Chapter II-2 also required all ships to be provided with a fire training manual covering fire safety aspects and use of the onboard fire safety systems. SOLAS required fire drills to be planned with the purpose of practising the various emergencies that could occur on board, and that these exercises, as far as practicable, be conducted as if there were an actual emergency. Carbon dioxide release management The available guidance86 and the training provided to the crew detailed consistent principles and procedures to be undertaken for the safe and effective release of CO2 to tackle fires in machinery spaces. 1.10.6 Similar accidents involving emergency response The Calypso – engine room fire On 6 May 2006, an intense fire broke out in the engine room of the Cyprus registered cruise ship The Calypso while on passage from Tilbury, England to St. Peter Port, Guernsey with 708 passengers and crew on board (MAIB report 8/200787). The subsequent firefighting response highlighted flaws in the knowledge, experience and training of some of the ship’s senior officers, who did not follow recognised good practice. On several occasions soon after they thought CO2 had been released, senior officers re-entered the engine room without the proper equipment or backup and with the consequent risk of allowing air to feed the fire. The investigation report recommended to the Cyprus Maritime Administration to, in cooperation with the MCA, propose to the IMO that a circular be produced to include: The required crew actions following the use of fixed installation CO2 systems, aimed at improving the general knowledge of these systems, including inspections and checks of the system status after use. The recommendation did not result in the IMO issuing a circular. Oscar Wilde – auxiliary engine room fire On 2 February 2010, a fire broke out in the auxiliary engine room on the Bahamas registered ro-ro passenger ferry Oscar Wilde following its departure from Falmouth, England (MAIB report 3/201188). The fire was eventually extinguished by the ship’s crew. 86 Guidance on the procedure for the release of CO2 was available from a wide range of sources, including IMO Model Course 2.03 – Advanced Training in Fire Fighting; Standard Club: A Master’s Guide to Fire Safety on Ferries; and Videotel training module 2687: machinery space fires. 87 https://www.gov.uk/maib-reports/fire-in-engine-room-on-passenger-cruise-ship-the-calypso-off-beachy- head-england 88 https://www.gov.uk/maib-reports/fire-in-machinery-space-on-ro-ro-passenger-ferry-oscar-wilde-in-falmouth- bay-england
71 The actions taken by the crew to combat the fire were swift and positive following the initial alarm. The commander of the firefighting effort had recently completed a command and control training course, and this was reflected in their performance during the fire. While noting issues with re-entry procedures and UHF radio communication, the report highlighted the effectiveness of the shore-based training arranged by the company; realistic emergency drills; and the determination and efforts of the ship’s crew in dealing with the emergency. Pride of Canterbury – engine room fire The investigation into a major fire in the engine room of the ro-ro passenger ferry Pride of Canterbury on 29 September 2014 (MAIB report 22/201589) noted that: The swift and timely response of the crew can be credited to their training and to the regular emergency drills held on board Pride of Canterbury. While the emergency did not follow any one set procedure, the drills enabled good team working and ultimately led to a successful outcome with no injuries to passengers or crew. Arco Avon – engine room fire On 18 August 2015, a fire broke out in the engine room of the dredger Arco Avon off Great Yarmouth, England. The fire was extinguished following activation of the CO2 smothering system; however, 50% of the CO2 cylinders had failed to operate and required manual activation to inject the correct amount of gas into the engine room. The investigation (MAIB report 17/201690) noted a concern that: both the chief engineer and the second engineer opened different access doors to the engine room while alone and without any fire-fighting medium for protection. [sic] and that: There was a significant risk that CO2 would have escaped into the cylinder room and thus depleted the oxygen content of the atmosphere. 89 https://www.gov.uk/maib-reports/fire-in-engine-room-on-ro-ro-passenger-ferry-pride-of-canterbury 90 https://www.gov.uk/maib-reports/fire-in-the-engine-room-on-the-suction-dredger-arco-avon-with-loss-of-1- life
72 SECTION 2 – ANALYSIS 2.1 AIM The purpose of the analysis is to provide an overview of the individual technical and operational factors that contributed to the accident as the basis for making recommendations to prevent similar accidents occurring in the future. 2.2 OVERVIEW The fire on board Finnmaster occurred after the inboard fuel injection pump coupling on AE2 partially failed. The resulting effect on AE2’s fuel timing caused excessive exhaust temperatures and rough engine running; an incorrectly sealed joint leaked exhaust gas, which impinged on an adjacent low pressure flexible fuel hose; the flexible hose failed and fuel sprayed under pressure onto hot exhaust components and immediately ignited, causing a fire in the AER. The fire disrupted the running of the AEs and Finnmaster lost main electrical power; the EDG started but was unable to supply emergency power due to a fault in the circuit breaker. Finnmaster’s crew operated the CO2 system, but it did not operate as designed due to leaks and blockages in the pilot activation system. The analysis will determine the contributory causes and circumstances of the initial failure of AE2 leading to the fire. These include: the partial failure of the inboard fuel injection pump drive coupling; the use of flexible fuel hoses in the alarm and monitoring system; and the conduct of maintenance activities on board. The analysis will also discuss the framework and oversight of machinery installations and maintenance. The analysis will examine the circumstances leading to the partial failure of Finnmaster’s CO2 system and its impact on the system’s ability to extinguish the fire. The analysis examines the maintenance of the CO2 system, including the sourcing of components, and the systems of oversight and approval in place. The analysis will also examine the technical factors leading to the failure of the electrical supplies on Finnmaster, the consequences of the power failure, and the effectiveness of the measures used to promote the reliability of safety critical equipment on board. The conduct and effectiveness of the response of the crew to the emergency will also be analysed. 2.3 AUXILIARY ENGINE 2 2.3.1 Partial failure of AE2 fuel injection pump drive coupling Mechanism of failure It is likely that the initial failure of the inboard fuel injection pump coupling was due to fatigue of one of the drive end coupling bolts. The threaded portion of the bolt failed, detached from the coupling and fell into the bilge. The shank of the bolt remained in the coupling slot where it was subject to significant wear due to movement in the slot, also causing damage to the laminated plates in the coupling.
73 The failure of the bolt released the tension on one side of the laminated plate stack. The increased loading of the opposing bolt resulted in damage to the laminated plates in that area, incrementally releasing the tension in that bolt. The nut on the opposing bolt eventually loosened and also fell into the bilge. The bolt remained in the coupling slot and tilted, jamming it against the cross coupling where it continued to drive the fuel injection pump. However, the relative position of the input and output shafts of the coupling was changed, resulting in the retardation of the fuel injection timing on the inboard bank of cylinders. It is possible that a significant period of time passed after the initial failure of the drive end coupling bolt. The protection cover over the coupling probably prevented a passing inspection of the engine identifying the missing bolt, and the engine parameters would not have indicated a problem until the fuel injection timing changed. It is therefore unlikely that the crew would have been able to identify the failure of a single bolt unless specifically tasked to inspect the coupling. Effect of the coupling partial failure on fuel injection timing The failure of the bolts in the inboard fuel injection pump coupling did not result in the complete failure of drive to the fuel injection pump. The pump continued to rotate and inject fuel into the cylinders. It was not possible to accurately determine the fuel injection timing on the inboard bank of cylinders before the failure of the coupling. From the last recorded inspection of the coupling on 9 September 202091, AE2 operated for a cumulative total of 1,331 hours before the fire occurred (see Table 1). As no abnormal exhaust gas temperatures were recorded in the engine logbook, and due to the lack of comment following the 1/E’s inspection of AE2 immediately before the fire, it is almost certain that the fuel injection timing was correct up to the completion of this last inspection of the running engine. While it is possible that the witness marks noted on the surface of the coupling flange reflected a previous securing position, the marks suggest that, before the accident, the bolts were likely positioned approximately 9° along the slot when measured from the extreme clockwise position, viewed from the drive end. Following the failure of the bolts, the position of the coupling had rotated approximately 17° from the position as indicated by the witness marks. The angled position of the bolt shank retained in the slot allowed movement beyond the end of the adjustment slot (Figure 27). Due to the difference in speed of rotation between the fuel injection pump and engine crankshaft, the failure of the fuel injection pump coupling bolts caused the injection timing on the inboard bank of cylinders on AE2 to retard by approximately 34°. This equated to a static injection timing of 12° after TDC. 91 Analysis of the records showed a further inspection was probably carried out in April 2021, but not recorded in the PMS.
74 Effect of fuel injection timing retardation on AE2 In normal operation, fuel injection would commence before the piston reached TDC on the compression stroke. The fuel, ignited by the heat of compression, would build pressure in the cylinder. The combustion gases would expand and increase pressure in the cylinder to a peak pressure at approximately 10° after TDC, pushing the piston down the cylinder until the exhaust valve opened at 57°92 before the piston reached bottom dead centre (BDC)93. 92 57° before BDC is the design value with no clearance at the tappet. The actual value on each cylinder would be dependent on the actual tappet clearance and temperature of the engine components. 93 The angular position of the crankshaft with the piston in its lowermost position in the cylinder.Representative diagram overlaid with dashed red lines and directional arrows pointing to the right to denote the 17 degrees rotation between the previous securing position and the position at the point of failure. Figure 27: Displacement of fuel injection pump coupling due to partial failure Close-up of a drive end coupling flange overlaid with a series of illustrated dashed red lines and a downward-pointing directional arrow to represent the previous position of the washer and movement of the securing bolt. The surfaces are coated with fine white powder. Drive end coupling flange 17° Image courtesy of Mitsubishi Heavy Industries Ltd
75 With the fuel injection timing retarded, fuel on the inboard bank of cylinders was injected when the pistons were already descending on the expansion stroke. Combustion continued during the exhaust stroke and into the exhaust system. The temperature of the exhaust gases in the manifold rose significantly, leading to a very high temperature at the inlet to the turbocharger. The late injection of fuel significantly reduced the power being produced by the inboard bank of cylinders. The power reduction caused AE2’s governor to react and increase the fuel setting to inject more fuel into the cylinders to maintain the speed of the engine. The increase in fuel rack setting affected both banks of cylinders and the exhaust temperature of the outboard bank increased proportionally, though the fuel injection timing, and hence the quality of combustion, was unaffected on this side of the engine. The electrical loading on AE2 increased during departure from Hull with the use of the bow thruster, further raising the exhaust temperatures in the engine. Immediately before the fire, the 1/E noted that the temperatures on the outlet from both turbochargers were at least 650°C; the maximum reading on the gauges. The temperature of the exhaust gas before its entry to the turbochargers is unknown but would have been significantly higher than that observed at the outlets. Despite the effect of the partial failure of the fuel injection pump coupling on combustion in the engine, AE2 remained capable of producing the required power and it remained connected to the main electrical switchboard in parallel with AE1. None of the measured parameters on AE2 were sufficiently affected to activate any alarm or trip function to either alert the engineers of a problem or shutdown the engine. AE2 was last inspected shortly after 1920 on 19 September 2021, while running during preparations for departure from Hull. With no indication of a problem at that time, the engineers remained unaware of the partial coupling failure until the fire alarm sounded at 2013 to signal smoke in the AER. Maintenance of the fuel injection pump coupling Finnmaster’s PMS records showed that the fuel injection pump couplings on AE2 had a history of failure. The recorded failure of the coupling in June 2018 and the use of thread locking compound in April 2021 evidenced the weakness in this assembly, and its recognition as such on board. The correct orientation of the remaining rounded washers noted in the coupling following the fire suggested that the coupling was assembled with the correct components at that time. Though the PMS records did not indicate what torque that had been used to secure the coupling bolts, all the instructions on board were consistent with the correct value and no evidence suggested that the incorrect torque had been applied when the bolts were installed. The use of thread locking compound by the ship’s engineers was probably intended to mitigate the known risk of a coupling failure. It cannot be determined whether the use of the compound contributed to the failure; however, its use was contrary to the maintenance instructions of the engine manufacturer. One nut had detached from its bolt thread, indicating that the compound had not prevented the nut loosening.
76 As maintenance on Finnmaster was managed through the PMS and not with reference to the service manual, it is unlikely that the differing fuel injection pump coupling inspection frequency between the PMS the operation and maintenance manual would have been identified. With no formal mechanism to report failures outside the AEs’ warranty period, it is possible the OEM was unaware of the ongoing tendency for these couplings to fail in the manner that Finnmaster‘s AE2 inboard coupling did, though MTEE personnel understood the risk of slippage. Operational failures of the couplings that did not result in such catastrophic outcomes as on Finnmaster would likely only result in remedial maintenance, and not necessarily be highlighted as a significant issue. The OEM had modified the design of the coupling arrangement over time to improve its reliability, but it was evident from Finnmaster’s PMS records and the anecdotal evidence from other users of the engine series that the design modifications had been unsuccessful in delivering a comprehensive solution. The repeated failures of the couplings on Finnmaster were not escalated to the company as recommended in the IACS guidance on the management of maintenance. The lack of reporting prevented concerns being raised with the OEM to enable it to consider further design amendments to reduce the risk of failure. As with the multiple engine failures identified in the Wight Sky investigation, greater consultation on known and repetitive failures might have provided the opportunity for higher level technical investigations, including by the engine manufacturer if appropriate. 2.3.2 Exhaust gas leakage The exhaust temperatures on the outlet from both turbochargers were noted as being at least 650°C immediately before the fire. The timing of fuel injection into the cylinders on the outboard side of the engine was unaffected and, although significantly overloaded, the combustion in these cylinders would have been complete. The seizure of the spiral wound seal rings in the grooves of the exhaust transition ring on the outlet from the outboard turbocharger was caused by the presence of the exhaust sealing compound, which had been applied to the joint during the October 2017 service of AE2 by Inter Marine. Though the sealing compound provided a seal for the transition ring joint when initially applied, this was broken by relative movement between the engine and the exhaust system once the compound hardened. The seizure of the sealing rings in their grooves prevented them working as intended and provided a route for the passage of exhaust gas to atmosphere. Exhaust gas leaked past the spiral wound seal rings on the outlet from the outboard turbocharger. While the exhaust gas leakage was inside the insulated box structure covering the exhaust pipe between the two turbochargers, the leaking gas was able to emerge from the gap between the box structure and the flywheel casing. The flexible fuel hose leading from the inboard fuel cartridge filters to the instrument panel passed across the engine flywheel casing adjacent to the gap and beneath the insulation blankets covering the box structure.
77 The volume and temperature of the exhaust gas produced by the engine rose significantly when the inboard fuel injection pump coupling partially failed. The incorrect maintenance procedure on AE2’s exhaust allowed high temperature exhaust gas to leak into the insulated box structure, below which the flexible hose containing fuel under pressure was positioned (Figure 28). 2.3.3 Use of service technicians Finnlines provided support to the ship’s crew by engaging Inter Marine to complete AE2’s major overhaul in October 2017. The technicians employed by Inter Marine were experienced marine engineers. MTEE provided a passive training framework for use by its approved service and spare parts suppliers. The system relied on the service provider, Inter Marine, to maintain the competence of the service technicians. The investigation identified that the overhaul of AE2 had not fully been completed in line with OEM instructions, specifically: the lack of washers identified by the crew in the coupling assembly at the time of the June 2018 failure; and, the use of sealing compound in the assembly of the exhaust transition ring on the outlet from the turbochargers. The latter was a contributory factor to the cause of the AER fire. There was little oversight of Inter Marine by Finnmaster’s engineers, and none by the classification society other than a test on completion of the work. The crediting of the survey for the classification certificate was primarily based on the report produced by Inter Marine and the running tests on its completion. Looking towards an uncovered exhaust pipe positioned with a hose beneath it that passes above a flywheel casing. An illustrated long red line with a downward-pointing directional arrow denotes the exhaust leakage from the turbocharger turbine. Discolouration to the steel plating immediately above the hose denotes scoring from the leakage. Turbocharger compressor casing Turbocharger turbine casing Scoring from exhaust leakage Insulated box structure Exhaust pipe Flywheel casing Gap AE2 with insulated box structure AE2 without insulated box structure Figure 28: AE2 exhaust gas leakage path
78 Inter Marine and MTEE measured the performance of the service technicians through feedback from customers. With no negative feedback, the service was accepted as completed to a satisfactory standard. The lack of a formal process of audit or verification by MTEE of the services provided by Inter Marine did not provide a mechanism for continual improvement or the identification of shortcomings in the conduct of the work undertaken. The audit by Finnlines of Inter Marine as a service provider was focused on business risk rather than technical performance. The monitoring, approval and assurance of work carried out during the major overhaul of AE2 was ineffective and put the safe operation of Finnmaster at risk. 2.3.4 Oversight of the alarm and monitoring system modification The original alarm and monitoring system modification to the AEs was installed no later than July 2006, but the then operator of Finnmaster did not submit the design for classification society approval. It is possible that the flexible hoses originally installed were replaced between their original installation and their assessment in October 2018, but no records were identified to verify this. The hydraulic hose company engaged to check the flexible hoses on the AEs in 2018 replaced them on a like-for-like basis. Neither that company nor Finnmaster’s crew referenced the appropriate type approval certificate or classification rules to ensure the relevant criteria were met. The original modification to the alarm system on Finnmaster’s AEs included flexible hoses that were longer than 1.5m, installed in a position that exposed them to elevated temperatures, and had no means of isolation. The modification did not meet the requirements of SOLAS Chapter II-2 or classification society rules. It is almost certain that the modified system would not have been approved had it been presented to DNV for approval. The lack of submission for approval meant that the opportunity to critically assess the system to ensure compliance with the requirements, and to identify the risk it presented, was missed. 2.3.5 Failure of flexible fuel hose and ignition of fuel leakage It is very likely the flexible hose leading from the fuel cartridge filters to the instrument panel on AE2 had been subject to elevated temperatures above its design criteria in the 4,687 running hours since installation. The fuel in the flexible hose was static and was unable to provide a cooling effect. Flexible hoses are known to degrade, become brittle and crack as the temperature increases. The USCG safety alert issued in 2017 (see Annex A) provided a very similar example of the deterioration of a flexible hose installation that led to an outcome comparable to that on Finnmaster. It is apparent that the leaking exhaust gas impinged the degraded flexible fuel hose, which allowed fuel at a pressure of about 3.8 bar to spray onto AE2’s hot exhaust components and spontaneously ignite.
79 The heat from the fire initiated at the aft end of AE2 further damaged the flexible fuel hose, leading to a progressive increase in the amount of fuel being released under pressure. When Finnmaster lost power the auxiliary engine fuel feed pump stopped. The fire was already well established by this point and fuel continued to flow from the damaged flexible hose, though at a much-reduced rate. The insulated box structure, covering the exhaust manifolds and turbocharger turbine casing and supplemented by the insulation blankets, was intended to prevent any external oil spray impinging on a high temperature surface within it. The routing of the flexible hose as part of the modification to the AE2 alarm and monitoring system exposed it to elevated temperatures that degraded the hose and increased the risk of failure. The routing of the flexible hose meant that any fuel leakage was likely to come into contact with high temperature surfaces. Both of these elements increased the potential for a fire. 2.3.6 Surveys by classification societies The annual endorsement of Finnmaster’s classification and statutory certificates was completed by DNV surveyors from June 2006, when the flexible hoses for the modified alarm system were known to have been in place, until the transfer of classification to RINA in January 2016. The risks posed by the flexible hose installation were not identified during inspections carried out on board as part of the classification society oversight of the vessel. From 2013, when the DNV rules were amended, there was no requirement for a specific examination by a surveyor of the AEs’ local instrumentation. Consequently, the instruments on the local panels on Finnmaster’s AEs would not have been scrutinised during the ship’s annual survey for the certificate of classification. The survey of the protection of high temperature surfaces, instrumentation and fuel piping systems, as well as a critical examination for fire safety during the general examination of the machinery spaces, was included in the scope set out in the rules of both DNV and RINA for annual surveys. The only fire safety deficiencies recorded were those identified in 2006 for the condition of the exhaust insulation, which led to the issue of a condition of classification. The failure to identify a noncompliance with the classification rules when specifically examining for fire safety, and photographing, a noncompliant installation indicated a possible lack of awareness on the part of the attending surveyor. Despite requirements in both DNV and RINA rules for the annual fire safety examination of machinery and equipment, the expectation for the conduct of a general examination was a brief inspection of the machinery spaces to identify obvious shortcomings. Without significant focus in the instructions to surveyors on the guidance available to prevent fires in engine rooms, it is very unlikely that a surveyor would identify the flexible hoses installed on the AEs as noncompliant during an inspection covering the entire machinery space. This would be further compounded as time passed and the visible condition of the flexible hose blended into the appearance of the other system components so it would not stand out as a modification to the original system.
80 Throughout the extended period of time that the flexible fuel hoses were in place on the auxiliary engines on Finnmaster, none of the inspections or surveys carried out by either classification society identified the noncompliance or the potential risk arising from their installation. 2.3.7 Surveys and inspections by Finnmaster's crew The responsibility for ensuring that Finnmaster was maintained in compliance with the regulatory requirements and classification society rules lay with the companies operating Finnmaster. The C/E had technical responsibility for all maintenance on board Finnlines ships. Both DNV and RINA permitted the survey of machinery items by a C/E under the CMS survey framework and relied on the C/Es for the examination of class items during maintenance when under the MPMS framework. The rules placed responsibility on the company to ensure that C/Es met the required levels of qualification and experience to carry out surveys. Neither the classification societies nor Finnlines provided C/Es with effective guidance or support on the rule requirements to assist them to identify noncompliances. Consequently, Finnmaster’s C/Es did not identify the inappropriate flexible hose installations on the AEs or the variations to OEM maintenance routines during AE2’s major overhaul. The investigation showed that the lessons identified in the Finlandia Seaways report about the support provided to C/Es in the conduct of surveys of machinery items had extended no further than the organisations directly involved in that case. The subsequent Stena Europe recommendation to provide training to improve how C/ Es conduct class-related equipment inspections indicated that this continues to be a problem. The passive nature of Finnlines’ management of its C/Es’ authorisations to conduct surveys did not ensure that they were fully familiar with the expectations for the survey of equipment. Consequently, the conduct of surveys relied on a C/E’s knowledge and experience. The surveys and inspections conducted by C/Es were ineffectively managed under delegation from the classification societies. They were neither supported nor controlled by the operating companies. This resulted in a risk that nonconformities would not be identified. 2.3.8 Guidance on measures to prevent fires in machinery spaces The IMO Circular MSC/Circ.647 and the later MSC.1/Circ.1321 provided information on the prevention of fires in machinery spaces and advised flag states to promulgate the guidance to the shipping industry. The importance of disseminating guidance on measures to prevent fires in machinery spaces was highlighted in the Pride of Canterbury accident report (see section 1.10.6). Finnmaster’s flag state did not circulate these IMO publications to Finnlines, resulting in a lack of readily available guidance to C/Es during their examinations of the flexible hose installations on Finnmaster’s AE.
81 The lack of effective dissemination of safety information potentially caused a lack of awareness of the risks associated with flexible hose installations, reducing the effectiveness of the inspections and surveys conducted on board Finnmaster and increasing the risk of a machinery space fire. 2.4 FIXED CARBON DIOXIDE FIRE-EXTINGUISHING SYSTEM 2.4.1 System operation The sequence that the C/E followed to activate the CO2 system matched the operating instructions for system. After the time delay unit in the system activated, CO2 was admitted to the pilot system connected to the series of flexible hose assemblies at cylinder C268 in the CO2 room (see Figure 19). The system operated as intended up until this point in the activation sequence. The discharge valves on six94 main cylinders operated and released CO2 into the common discharge manifold. The engine room booster valve, already opened by the activation signal from the release station, directed CO2 from the common discharge manifold to open the engine room section valve and admitted CO2 into the pilot system at cylinder C227. The blocked flexible pilot hose assembly installed in the pilot system between cylinders C241 and C242 prevented the flow of CO2 through the system and effectively divided the engine room system in two. CO2 from the booster valve was unable to pass beyond the blocked flexible hose. The leakage of CO2 from the pilot system was significant. The pressure generated in the section of the pilot system from the activation time delay unit did not rise sufficiently to open all the connected cylinder valves before the pilot cylinder’s contents were exhausted. The section of the pilot system pressurised from the booster valve contained leaks. However, the pressure achieved in this section was supplemented from the common discharge manifold and so was sufficient to operate the cylinder valves on a further 15 cylinders95. The post-fire system activation tests showed that all of the cylinder valves would have operated as designed had they received pilot CO2 of sufficient pressure. The reversal of the inlet pipework to the pilot system from the time delay unit and booster valve did not affect the operation of the system. However, due to the position and magnitude of the leaks in the pilot system, the reversal might have influenced the number of cylinders released. The blockages and leaks identified in the system would not have prevented manual operation of the valves individually to inject the appropriate quantity of CO2 to the engine room. 94 Cylinders C262, C263, C265, C266, C267 and C268. 95 Cylinders C227 to C241.
82 Finnmaster’s CO2 system was activated correctly by the C/E but failed to operate as designed due to a combination of leaks and the blockage in the pilot system. Leakage from the pilot system allowed a proportion of the CO2 discharged by the system to enter the CO2 room. With no active ventilation in the space the gas would accumulate, placing any crew entering the space in danger. CO2 concentration achieved in the engine room Normal atmospheric air has an oxygen content of approximately 21%. A full discharge of the CO2 system would release 1,890kg of CO2 with a free volume of 1,058m³ into the engine room. This would reduce the oxygen content to approximately 14%, a level that could not sustain combustion. The partial failure of the system reduced the quantity of CO2 injected to 945kg with a free volume of 529m³, which was 50% of that intended. At this concentration the proportion of oxygen in the atmosphere in the engine room was reduced to approximately 17%, allowing combustion to continue. Ventilation openings to the engine room remained open throughout the fire, which might have allowed fresh air to be drawn into the engine room and for CO2 to escape due to thermal currents in the atmosphere caused by the fire. Any additional air entering the space would only have had the effect of increasing the available oxygen for the fire. The partial failure of the CO2 system on board Finnmaster did not achieve the designed volumetric discharge quantity. This resulted in a concentration of oxygen in the engine room that remained able to support combustion and did not extinguish the fire in the AER. Effect of system defects on CO2 system ability to extinguish cargo hold fires Analysis of the effect of the position of the flexible hose assembly blockages in the cargo hold pilot system showed that neither the upper cargo hold nor lower cargo hold systems would have operated as required in the event of their use. As the CO2 from both the time delay unit and booster systems in the cargo hold pilot systems both entered at the same end of the pilot system in the CO2 room, the blockage between cylinders C207 and C208 would have prevented the activation of all the CO2 cylinder valves downstream of that blockage96. The number of cylinders opening automatically in the event of an activation of either system would have reduced by the amount shown in Table 3. Compartment Cylinders configured for automatic release Actual operational cylinders (due to blockage) % Achievable oxygen concentration % Upper cargo hold 179 118 66 17 Lower cargo hold 100 39 39 19 Table 3: Effect of a cargo hold flexible pilot hose assembly blockage on CO2 injection 96 See Figure 23.
83 The pilot system defects meant that it was very unlikely that a concentration of CO2 sufficient to extinguish a fire in either of the cargo holds would have been achieved by the automatic injection of CO2 from the main fixed high-pressure system on Finnmaster. The system allowed for the manual release of CO2 from the main cylinders. In all cases, were the need identified, it would have been possible for the appropriate amount of CO2 to be released into the protected space using the manual handles provided for the purpose. This would reduce the level of oxygen in the space to one where combustion would not have been possible. 2.4.2 System service Flexible hose assembly production and oversight The components used in the manufacture of the flexible hose assemblies installed in the CO2 system on board Finnmaster were required to be produced in line with RINA type approval standards. Geeve held an approval of manufacturer certificate issued by DNV. The certificate permitted Geeve to manufacture flexible hose assemblies for installation on ships under DNV’s responsibility. Geeve did not hold any authorisation issued by RINA for the production of flexible hose assemblies and RINA had no oversight of Geeve’s assembly production process. Geeve made two deliveries of flexible hose assemblies to Viking that were used in the installation on board Finnmaster. The flexible hose assemblies in both deliveries were supported by test certificates stating the applicable DNV type approvals and referencing the DNV rules. The DNV type approvals referenced in the Geeve test certificates included the requirement for the couplings used in the manufacture of the flexible hose assemblies to be of a type produced by Parker. Geeve had amended its purchasing procedure and instead sourced the couplings for the flexible hose assemblies from HSR. As HSR was distanced from the maritime regulations governing the use of the flexible hose assemblies, it is very unlikely that the company was aware of the couplings’ intended use or any type approval requirement. Consequently, the couplings used in Finnmaster’s CO2 system flexible pilot hoses were not manufactured to the standard that the type approval process was intended to deliver. The quality assurance procedure used by Geeve did not ensure that the type approval requirement for each flexible hose assembly to be subject to a pressure test was met. Only 20% of each batch of hose assemblies was actually tested and the test procedure would not necessarily identify any blockages or pressurise the entire flexible hose if a blockage was present. DNV did have oversight of Geeve’s flexible hose assembly manufacturing procedures through the tests conducted for the issue of the approval of manufacturer certificate. The initial survey for this certificate in 2017, and its subsequent renewal in June 2020, did not indicate any identified issues with the Geeve systems. This conflicts with the findings of the DNV survey of Geeve in April 2022 that was undertaken following concerns raised during this investigation.
84 This audit identified multiple failings in the management of the production process sufficient for the approval of Geeve as a manufacturer of flexible hose assemblies to be rescinded. Geeve did hold a responsibility to inform DNV of any changes to the procedures used in the manufacture of flexible hose assemblies, which would include changes to the components used in production. Without receiving any such notification, DNV did not have the opportunity to assess the Geeve procedures against the type approval standards until the next scheduled renewal of the approval of manufacturer certificate. Viking did not have the ability to exercise control over the manufacturing process, nor the system of assurance leading up to the delivery from Geeve, so relied on the certification accompanying the delivery of flexible hose assemblies to verify their quality. The purchasing systems for Viking LSE in the Netherlands and Viking in Finland did not identify the lack of appropriate RINA certificates for the manufacturer of the flexible hose assemblies or type approvals accompanying the flexible pilot hoses supplied for use on Finnmaster. The oversight of the manufacture and supply of the flexible hose assemblies by DNV, RINA and the Viking Group was not robust enough to prevent them entering the supply chain and being installed in Finnmaster’s CO2 system. Regardless of DNV’s oversight of Geeve, flexible hose assemblies produced under the DNV approval of manufacturers scheme were not valid for installation on Finnmaster after 1 January 2016, when the ship’s classification transferred to RINA. Servicing procedures The March 2021 service by Viking technicians of Finnmaster’s high-pressure CO2 system used checklists that referenced the example service chart in MSC.1/ Circ.1318. The example checklist contained the entry, servo tubing/pilot lines pressure tested at maximum working pressure and checked for leakages and blockage. The onboard CO2 system manual and the manual available to the Viking technicians provided methods to test the operation of the pilot system. The service report indicated that a test of the cylinder valves and pilot system had been completed, including a test for both leakage and blockage. The blocked flexible hoses were in position at the time of the service, and this combined with pilot system leaks would have prevented the operation of some cylinder valves. The defects were not identified during the test. It is very likely that the test conducted during the service of the CO2 system on board Finnmaster differed from the contents of the manuals held on the ship and by Viking. The test did not therefore wholly align with either of the minimum recommended maintenance methods set out in section 6.2 of MSC.1/Circ.1318. It is possible that the CO2 system on Finnmaster was not fully operational from the initial replacement of flexible hose assemblies in July 2020. The tests of the system carried out in March 2021 failed to identify this deficiency.
85 Survey oversight The guidance in MSC.1/Circ.1318 recommended that specific servicing tasks on the CO2 system be carried out at periodical and renewal surveys. The statutory oversight of the maintenance was reliant on the scheduled surveys required by SOLAS Chapter I. SOLAS required an examination of the CO2 system at the time of the survey but did not dictate the need for survey when maintenance was undertaken. Further, the survey procedures referenced by SOLAS and contained in the RINA procedures did not require the presence of a surveyor to witness the conduct of the service or testing of the CO2 system on Finnmaster. The periodical survey of Finnmaster was carried out in July 2021 leading to the endorsement of the SEC. While it could not be verified that the documents related to the service of the CO2 system in March 2021 were presented to the RINA surveyor, the report of the service was available on board. The report stated that a satisfactory service had been completed. In reality, the CO2 system had non-compliant components installed, loose connections and was not fully operational. These defects were not identified at time of survey. It is likely that the attending surveyor accepted the service report in good faith. Without any oversight of the servicing of the CO2 system on board Finnmaster, the surveys completed for the certification of the ship relied almost entirely on the quality assurance procedures used within the component supply chain, and the documentation produced by the service provider undertaking the maintenance. Approval of service suppliers The audit of Viking by Finnlines focused on business risk and its scope did not include any examination of the Viking maintenance or purchasing procedures. Though the audit provided the opportunity to identify potential shortfalls in the supply of components for installation in the CO2 system on board Finnmaster, it was limited in its ability to do so. TRAFICOM had delegated the responsibility for the approval of service suppliers for a range of activities undertaken on ships registered in Finland, but this did not extend to the acceptance of training of service technicians undertaking maintenance of fire-extinguishing systems. Information on the lack of approval by the flag administration was available to the RINA surveyors but, as Viking held a valid approval from RINA as a service supplier under the well-established IACS UR-Z17 framework, it is unlikely this would be identified. The flag state administration did not set out its criteria for the acceptance of standards for the training of technicians servicing fire-extinguishing systems as required by MSC.1/Circ.1318. Training of service suppliers The Viking technicians undertaking the service on Finnmaster were trained under the Viking Group system, using centralised training facilities in the Netherlands. They were experienced in the servicing of high-pressure CO2 systems but it is very unlikely that they followed the procedure contained in the available system manuals to perform service tests of the CO2 system on board. Had they done so, it is likely that the system faults would have been identified.
86 The local supervision and lack of independent oversight of the maintenance carried out allowed the service technicians to complete a service of Finnmaster’s CO2 systems that did not ensure it was operational on completion. International Maritime Organization guidance Section 6.2 of MSC.1/Circ.1318 provided two means of testing the pilot system intended to assure its integrity and function following a service. One test procedure only tested the activation heads and pilot system pipework without the heads being attached to the cylinders. The second test procedure only provided for a pressure test of the pilot system pipework and did not effectively test for a blockage in the system or the operation of the cylinder valves. The two tests were not equivalent, though their inclusion in the same section of the circular might imply this was the case. Neither test had the capability of ensuring that the system was fully operational at the point the system was returned to service as required by 6.2.3 of the circular. The IMO guidance in MSC.1/Circ.1318 for the servicing of CO2 systems allowed for a test procedure that did not explicitly prove that the activation system was fully operational on completion of maintenance. International Association of Classification Societies unified requirements Viking undertook servicing of the CO2 systems throughout the Finnlines fleet. It was approved to inspect and maintain fire-extinguishing equipment in line with the IACS UR-Z17 procedures by four IACS member classification societies, including RINA. As the surveying of CO2 systems depended on the work of approved service suppliers, the application and content of IACS UR-Z17 procedures was critical. The September 2018 investigation report on the unintentional releases of CO2 on board Eddystone and Red Eagle highlighted the reliance placed on companies servicing CO2 systems. In its report the MAIB made a recommendation (2018/125) to two IACS members proposing that an investigation be carried out into the application of UR-Z17. Subsequent amendments to UR-Z17 did not update the requirements for the assessment and approval of companies engaged in inspections and maintenance of fire-extinguishing equipment and systems. The response to the recommendation did not generate any effective change to improve the performance of service providers. Many elements of the Finnmaster investigation raised similar concerns to those highlighted in the Eddystone and Red Eagle report. It is apparent that the content and application of UR-Z17 continues to not deliver a satisfactory level of service from the approved service suppliers that maintain the safety of CO2 systems on board ships. 2.5 ELECTRICAL SYSTEM FAILURES 2.5.1 Loss of power AE1 continued to function for 4 minutes after the fire started. It stopped when the fire impinged on its shutdown control circuits. When AE1 stopped, the main and emergency switchboards lost power and Finnmaster consequently lost propulsion.
87 2.5.2 Circuit breaker failure When AE1 stopped providing power to the main switchboard, the interconnector circuit breaker between the main and emergency switchboards opened and the EDG automatically started. When the voltage supplied by the EDG stabilised, the circuit breaker connecting it to the emergency switchboard failed to close correctly and the power from the EDG was unable to reach the emergency switchboard. It is likely that the defective soldered connections identified by Schneider Electric caused an intermittent break in the circuit to the undervoltage coil. This disrupted the logic of the internal control circuits of the motor module. This likely resulted in the motor module repeatedly opening and closing the circuit breaker until the ratchet pawl detached, fell into the circuit breaker switch mechanism and jammed it. The continued action of the motor on the jammed mechanism resulted in the plastic circuit breaker switch handle and the SD lever breaking, preventing the subsequent circuit breaker closure by the motor module. The dislodged pawl in the ratchet mechanism also made it impossible for the crew to charge the control unit spring using the manual lever. The failure of the circuit breaker switch handle would have prevented a manual closure of the circuit breaker, even if the crew had managed to charge the spring. The location of the defective soldered connections within the EDG circuit breaker meant that it was very unlikely they would have been identified in any of the inspections or surveys carried out on board Finnmaster. It is likely that the defective solder connections had been present since the manufacture of the EDG circuit breaker and its installation into Finnmaster when the ship was built. The circuit breaker worked as intended when operated up until the time of the accident. 2.5.3 Power loss consequences Finnmaster’s loss of power impacted the crew’s ability to respond effectively to the emergency because:
● The loss of main propulsion, steering gear, and the bow thruster in the early stages of the emergency, reduced Finnmaster’s manoeuvrability.
● The cooling fan for the EDG radiator was unable to start and the ventilation dampers on the radiator duct remained closed. This caused the EDG engine cooling water temperature to rise.
● The lack of power supply to the emergency fire pump prevented it from pressurising the fire main.
● The mooring winches were unavailable to assist with securing the tug lines and mooring lines when Finnmaster was eventually brought alongside the berth.
● The UHF radio system became inoperable, restricting communication between the crew as they dealt with the emergency. The loss of power on board Finnmaster caused a consequential loss of critical safety equipment needed to support the efforts of the crew in fighting the fire and to safely moor the ship.
88 2.5.4 Emergency power supply testing Finnmaster’s SMS identified the emergency generator and emergency switchboard as critical equipment necessary for the safe operation of the ship that required routine testing to ensure their reliability. The weekly EDG off-load tests, the frequency of which exceeded that set out in the PMS, provided assurance that the engine driving the emergency generator was operational and that the EDG was able to produce the required frequency and voltage. Finnmaster’s EDG circuit breaker would only have operated when the emergency generator was put on load, supplying the emergency switchboard. With a 6-monthly periodicity under Finnlines management, it is possible that the circuit breaker had only operated less than 25 times in the preceding 5 years, with possibly as few as 100 operations in total since it was installed. The opportunity for any defect to the EDG circuit breaker to become apparent was limited. Classification society surveys provided assurance that the vessel complied with the standards required for the issue and maintenance of the relevant certificates. The tests conducted during the surveys confirmed that at the time of the survey the ship’s equipment and systems met those requirements. As such, the surveys only formed part of the overall scheme of assurance. The EDG testing regime on board Finnmaster did not identify the latent defect with the EDG circuit breaker and promote the reliability of the system to ensure it was operational during emergency situations. 2.5.5 Emergency sources of power testing requirements The ISM code required specific measures aimed at promoting the reliability of safety-critical equipment, noting that the measures should include the regular testing of standby arrangements and equipment that is not in continuous use. The 2017 SIAF safety study report highlighted these requirements, identifying that the fast-ageing of automation systems was a problem and that tests were intended to detect deficiencies. In the year before the fire on Finnmaster, the failure of an emergency source of power was a factor in almost 10% of detentions in the Paris MOU region, raising the concern that onboard testing procedures were not identifying faults in emergency power systems. None of the relevant statutory requirements set out a schedule for the testing of emergency sources of power. SOLAS Chapter II-2 required the provision of a means to test the emergency source of power but was silent on the expectations for doing so. Though SOLAS Chapter V included the need for a 3-monthly test of alternative power supplies while testing the emergency steering system, it was not explicit in the requirement to test the full extent of the emergency power supply including the EDG. The IMO produced no guidance on the expectations for testing EDGs to clarify the extent of the test anticipated by SOLAS, and TRAFICOM did not produce any national guidance similar to that of MGN 52 (M+F). With no guidance from the IMO or TRAFICOM, Finnmaster’s emergency power supply was only tested once between annual surveys, which was insufficient to identify the latent defects in the EDG circuit breaker.
89 2.5.6 Fire party communication equipment standards The loss of power supply to Finnmaster’s UHF repeater unit significantly compromised the ability of the master to monitor or exercise control over the activities of the crew during the emergency. With no functional standards to apply for the handheld radios carried on board to meet the requirement for two-way communication, surveys were limited to noting the presence and operation of the UHF radio units but did not consider their effectiveness in emergency situations. Consequently, the implications of the loss of power to a UHF radio repeater unit were not identified at survey. The SOLAS requirements were not supported by guidance setting out the performance expectations of the equipment to ensure it was able to function during emergency situations. 2.6 EMERGENCY PROCEDURES 2.6.1 Safety management system The contents of the emergency procedures for responding to fires contained in Finnmaster’s SMS and training manual met the requirements of the flag state administration. The muster list set out the response required from the crew on hearing the fire alarm sound. The procedures described the actions to be taken in the event of a fire in the machinery space and the procedure for the release of CO2 to extinguish it. Fires drills were undertaken as part of the routine operation of the ship. However, in the 11 months before the fire a video shown to the crew was the only content specific to a machinery space fire, and only one of the senior officers on board at the time of the fire had been on Finnmaster when the video was shown. 2.6.2 Command and control When the fire started in the AER the master and 2/O were already at their assigned muster station on the bridge. The remainder of the crew were either off duty or at their assigned stations for the departure from Hull. No formal muster was carried out to ensure everyone, including the single passenger was accounted for; however, given that the muster list did not include all of the crew, some might anyway have been unaccounted for. The master was aware of the location of the initial smoke detection in the AER, confirmed by the C/E, but was likely focused on the safe navigation of the vessel in collaboration with the pilot. The master was unaware of the efforts being made to extinguish the fire and the risk of key crew members becoming casualties. The decision to release CO2 into the engine room was made without verifying that the space had been evacuated, posing a potential risk of asphyxiation to anyone who might have been inside. 2.6.3 Communication The crew were accustomed to being able to coordinate an effective emergency response using the internal UHF radio system and the loss of the UHF radio repeater proved a significant barrier to this. The communications breakdown
90 between the main parties substantially affected their understanding of the situation and the management of their response to it. Decisions were made and actions taken without a full understanding of the circumstances, placing crew members at risk. The crew’s methods to mitigate for the loss of the UHF repeater, the use of runners to pass messages, and the distribution of the handheld VHF radios showed recognition of the equipment available and provided a means of restoring a proportion of the communications necessary to deal with the emergency. 2.6.4 Carbon dioxide system activation Any entry by crew into the AER once the fire was established would have placed them at significant risk. The use of the CO2 system provided the safest and potentially most effective means of fighting the fire on board Finnmaster. When the CO2 system was activated the crew had not been fully accounted for. Further, the manual machinery space fire dampers had not been closed and the remotely operated fuel valves had not been shut so it was likely that the fire in the AER continued to be supplied with oxygen and fuel. When the 2/E checked the CO2 system had operated correctly, the ventilation fans in the CO2 room had stopped due to the loss of power. The pilot system of the CO2 system on Finnmaster contained leaks, and a quantity of CO2 had discharged into the compartment during the system activation. Consequently, the 2/E risked being overcome by the atmosphere in the compartment. Further, as the 2/E was working in isolation there was a risk of their absence going unnoticed for a significant period of time. The entry was carried out without recognition of the risk posed by the possibility of CO2 leakage into the space when the system was activated. The manual release of CO2 cylinders was not initiated when it became known that the CO2 system had only partially operated. Consequently, the opportunity to inject the correct amount of CO2 was missed and the operation of the system did not extinguish the fire. The Arco Avon report highlighted the benefits of operating CO2 system cylinders manually when necessary to ensure the correct quantity of gas is injected when a system fails to operate as intended. The senior engineers had undergone advanced firefighting training and were familiar with the operation of the CO2 system and the precautions to take to ensure it was done safely. Further, Finnmaster’s training manual provided explicit guidance on the need to ensure all personnel had left the area and to close the space down to prevent the ingress of air. Despite an understanding of the procedure for the release of CO2, it is likely that speed of response, compounded by the limited communication between the teams, was prioritised over aspects of the activation process. In this instance, a trade-off was made between the thoroughness of the structured procedure for the system activation against the time it would have taken to complete all the necessary stages. The crew response on board Finnmaster was similar to that of the senior officers on board The Calypso, whose actions also deviated from the onboard procedures and good practice. This led to a risk that the response might have been ineffective,
91 and placed people at risk. The report highlighted the importance of drills, practical exercises and crew taking the required actions following the activation of CO2 systems. With the desire to act quickly to extinguish the fire, the procedure used for the activation of the high-pressure CO2 system departed from established practice and risked being both hazardous to crew and enabling an escalation of the fire. 2.6.5 Crew firefighting response At the onset of the emergency, two attempts were made to fight the fire using portable fire extinguishers. The first, using a 6kg CO2 extinguisher, was made when both AEs and the engine room supply fans were still running. In these circumstances, it was very unlikely that the extinguishing effect of the limited amount of CO2 would have been successful. The lack of a cooling effect from a CO2 extinguisher, the flow of air into the space, and that being drawn into the adjacent turbochargers almost certainly dispersed the gas to an extent that made it ineffective as a means to extinguish the fire. The second attempt was made by the C/E, who entered the AER with a dry powder extinguisher and without wearing CABA. This entry placed the C/E at significant risk and was unlikely to have been successful given the extent of the fire. The use of a dry powder extinguisher would neither provide cooling effect nor the protection of a charged fired hose. After CO2 was injected into Finnmaster’s engine room the situation stabilised and there was a pause in the emergency response while the ship was brought alongside the berth. This provided an opportunity to assess the effectiveness of the initial firefighting response and determine the next course of action. With the focus switching from immediate response to system restoration, no decision was made to consolidate the CO2 procedures and secure the engine room openings, isolate the fuel supply, or inject additional CO2 to the space to achieve the desired concentration. Finnmaster’s training manual advised that, once CO2 had been injected into a compartment, the area must be allowed to cool before any doors were opened to prevent oxygen being admitted to the affected space and reigniting the fire. A two-person fire team wearing CABA entered the AER 19 minutes after the CO2 injection. It is unlikely that this period of time would have been sufficient for all the material in the space to have cooled enough to prevent reignition. The decision to enter the AER so soon after the CO2 was injected was probably based on the belief that the fire had been extinguished and a desire to confirm that this was the case. The risk posed due to the possibility of reignition of the fire, and the limited protection for the fire party members making the entry, likely outweighed any benefit. It is apparent that, although well-intentioned, Finnmaster’s crew response to the fire did not follow the guidance in the training manual and therefore increased the risk of casualties and the possibility of reignition.
92 2.6.6 Crew emergency training At the time of the fire all of Finnmaster’s senior officers except the master had participated in most of the recent drills conducted on board. Three of these drills contained elements relevant to the fire, including the use of local CO2 systems97; the closure of fire dampers; and the use of CABA. With the exception of the engine room ventilation exhaust fire dampers at the rear of the funnel, the crew had a good knowledge of the firefighting systems, their operation and the procedures for their use. However, the following risks had not been identified during drills:
● The UHF repeater unit was always supplied with power and able to support communication throughout the ship. The effect of a power failure on the system and its consequential impact on the crew’s ability to communicate during an emergency had not been identified as a risk.
● The shortcomings in the muster list instructions led to the possibility that missing crew members might be overlooked, and that key tasks might not be undertaken in an emergency. Exercises embed common practice between team members and mitigate the risk of skills diminishing over time. They also assist in the development of strategies to deal with emergencies on board and enable the evaluation of decisions made when managing complex fire scenarios in a training environment. In the 11 months before the fire, the drills on Finnmaster included a single exercise related to an engine room fire: the presentation of a video on engine room fire hazards. The introduction to this video noted that the engine room was a high fire risk area, but training for such a fire was limited in the ship’s drills schedule. Exercises in the use of the local CO2 systems had been carried out and the need to close fire dampers for the use of these systems was recognised and included. The frequency of fire exercises completed on board Finnmaster met the regulatory requirements. None of the emergency training reports completed on board indicated anything other than satisfactory drills being conducted. It is likely that the conduct of the drills did not test the limits of the organisation as a means of assessing opportunities for improvement. It is therefore unlikely that the exercises completed on board Finnmaster met the intent of SOLAS that exercises as far as practicable, be conducted as if there were an actual emergency. There was a marked contrast between the conduct of the response to the fire on Finnmaster and that on Oscar Wilde. While the scale of the impact of the breakdown in UHF communication differed, the ability of realistic crew drills to influence the outcome of an emergency on board was clear. Similarly, the report on the fire on board Pride of Canterbury provided an example of how an effectively trained and motivated crew were able to respond to an emergency they had not specifically practised dealing with. 97 The ship’s local CO2 systems were separate from the main installation used to fight the fire in the AER and the procedures for their operation differed.
93 It is probable that the crew’s response to the fire on Finnmaster relied more on the senior officers’ experience and knowledge derived from their professional training rather than the drills conducted on board. It is also likely that the training schedule for exercises carried out on Finnmaster did not provide regular practice in fighting engine room fires that reflected the high level of risk posed. 2.6.7 Summary The crew of Finnmaster were faced with an engine room fire scenario for which they had received very limited training. Further, their response to the emergency was hindered by the failure of critical systems that should have supported their efforts. It is apparent that some of the actions taken placed some crew members and the ship at risk, and that emergency drills had not been wholly effective in preparing the crew to respond to the emergency. 2.7 FIRE EXTINCTION The volume of CO2 injected into the engine room was insufficient to reduce the oxygen content of the atmosphere to a level that would extinguish the fire. The combustion was further supported as air was able to enter the machinery spaces through the open fire dampers. The measurements of the level of MGO in the service tank and the height of the failed flexible fuel hose where it passed over the top of the flywheel cover of AE2 indicated that there was a height difference of 50cm. When Finnmaster lost power, the fuel feed pump supplying the two AEs stopped. The remote closing valve on the outlet from the service tank remained open. The route from the service tank to the point of leakage was restricted by the system components and the small diameter of the pipework. It is almost certain that the pressure in the flexible hose, due only to the head of MGO from the service tank and the restrictions in the system, reduced the flow of MGO from the failed flexible hose, lessening the extent of the fire. When the fire team entered the AER the fire had diminished to a point it could be extinguished using a portable fire extinguisher. The principal reason that the fire was able to be extinguished was the loss of power to the fuel feed pump and the consequential reduction in the flow of fuel to the fire.
94 SECTION 3 – CONCLUSIONS 3.1 SAFETY ISSUES DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS
Historic AE fuel injection pump coupling faults were not addressed, and were not reported to the company. This prevented concerns being raised with the OEM to enable it to consider further design or procedural amendments to reduce the risk of failure. [2.3.1]
The incorrect maintenance procedure to AE2’s exhaust allowed high temperature exhaust gas to leak into the insulated box structure, below which the flexible fuel hose was positioned. [2.3.2]
The monitoring, approval and assurance of work carried out during the major overhaul of AE2 was ineffective and this put the safe operation of Finnmaster at risk [2.3.3]
The original modification to the AE’s alarm and monitoring systems did not meet the requirements set out in SOLAS Chapter II-2 or the classification society rules, was unapproved, and exposed the flexible hoses to elevated temperatures, increasing the risk of failure and the potential for a fire. [2.3.4]
Throughout the period that the flexible fuel hoses were in place on Finnmaster’s AEs, none of the inspections or surveys conducted by classification surveyors and the ships engineers identified the noncompliance or potential risk from such an installation. [2.3.6, 2.3.7]
The surveys and examinations conducted by C/Es under delegation from the classification societies through the life of the vessel were not effectively managed, supported or controlled by the operating companies or classification societies. [2.3.7]
The flag state administration and ship’s classification society did not effectively disseminate or apply the critical safety information in IMO Circular MSC.1/Circ.1321 on the prevention of fires in machinery spaces. [2.3.8] 3.2 SAFETY ISSUES NOT DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS
Finnmaster’s CO2 system failed to operate as designed due to a combination of leaks and a blocked flexible hose assembly installed in the pilot system. As a result, the amount of CO2 discharged to the engine room was insufficient to extinguish the fire in the AER. [2.4.1]
The defects in the CO2 system meant that it was unlikely that a fire in either of the cargo holds on Finnmaster would have been extinguished by the automatic activation of the CO2 system. [2.4.1]
The oversight of the manufacture and supply of the flexible hose assemblies was ineffective resulting in defective flexible hose assemblies entering the supply chain and being installed in Finnmaster’s CO2 system, making the system non-operational and placing the ship at risk. [2.4.2]
95
It is very likely the system test completed as part of the service of the CO2 system carried out in March 2021 did not follow the system manual procedure and consequently failed to identify the faults, placing the ship at risk. [2.4.2]
The IMO guidance in MSC.1/Circ.1318 for the servicing of CO2 systems allowed for a test procedure that did not explicitly prove that the activation system was fully operational on completion of maintenance. [2.4.2]
The flag state administration did not set out its criteria for the acceptance of standards for the training of service technicians undertaking servicing of fire- extinguishing systems as required by the IMO. [2.4.2]
The content and application of the IACS UR-Z17 procedure continues not to deliver the required level of service by approved service suppliers necessary to maintain the safety of CO2 fixed fire-extinguishing systems on board ships. [2.4.2]
The loss of all power on board Finnmaster caused a consequential loss of critical safety equipment required to support the efforts of the crew in fighting the fire and safely moor the vessel. [2.5.3]
The testing regime of the EDG on board Finnmaster did not identify the latent defect with the EDG circuit breaker nor promote the reliability of the system to ensure it was able to supply power to the emergency switchboard during emergency situations. [2.5.4]
SOLAS Chapter II-1, regulation 43.7 required only the provision of a facility to periodically test the emergency generator on load. The frequency of such tests was not defined in the convention. No guidance was provided by the IMO or the flag state administration on the expectations for the conduct of such tests. [2.5.5]
The two two-way portable radiotelephone apparatus required by SOLAS Chapter II-2 for firefighters’ communication were not supported by functional requirements that would ensure their operation in an emergency. [2.5.6]
Some elements of the on board emergency response placed crew members and the ship at risk, and the emergency drills had not been wholly effective in preparing the crew to respond to the emergency. [2.6.7]
96 SECTION 4 – ACTION TAKEN 4.1 MAIB ACTIONS The MAIB has:
● Issued MAIB Safety Bulletin 1/2022 (Annex K), highlighting the potential for manufacturing defects existing within flexible hose assemblies installed in the pilot systems of CO2 systems.
● Issued MAIB Safety Bulletin 1/2023 (Annex L), highlighting potential fire hazards from flexible hose installations. 4.2 ACTIONS TAKEN BY OTHER ORGANISATIONS In response to the two recommendations made to it in MAIB Safety Bulletin SB1/2022, Geeve Hydraulics B.V. has:
● Provided a copy of MAIB Safety Bulletin SB1/2022 to all customers supplied with flexible hose assemblies fitted with couplings supplied by HSR Hydraulics BV that did not meet the required type approval requirements, drawing attention to the safety issues raised and the need for immediate action to identify and rectify any defects found in safety critical systems98.
● Amended its purchasing, production and quality control procedures, presenting them to DNV for recertification to ensure that flexible hose assembly components are procured, and flexible hose assemblies are manufactured in line with the relevant type approval requirements99. Viking Life-Saving Equipment B.V., Netherlands has:
● Issued a group-wide safety bulletin to its marine fire service providers to highlight the initial findings in the CO2 system on board Finnmaster.
● Revised the group-wide test procedure contained in its management system to incorporate:
○a function test of all cylinder discharge valves;
○a leak test of the pilot system incorporating a manometer installed at the furthest point in the system from the location of the applied pressure; and
○a requirement for service stations in the group to check flexible hose assemblies for blockage on receipt from third party suppliers. Finnlines PLC has:
● Updated its supplier audit process to include people with knowledge of specific areas in the auditing of service suppliers and the review of inspection reports. 98 MAIB recommendation S2022/105. 99 MAIB recommendation S2022/106.
97
● Arranged for Viking Life-Saving Equipment Oy Finland to inspect and test all fixed CO2 systems in the Finnlines fleet and confirmed that these were in good condition and working as designed.
● Issued two fleet circulars requiring:
○an inspection of the high-pressure CO2 system’s remote and manual release systems on all vessel in the Finnlines fleet.
○confirmation that the instructions for manual release of the CO2 systems are correct on all vessels in the Finnlines fleet.
○the conduct of a risk assessment on preparations for entering the CO2 room in an emergency.
○the conduct of a drill on the procedure for manual release of CO2 cylinders.
○that any service by an external service company be reported to the respective ship superintendent and safety manager in advance and, if conducted, for it to be closely monitored by a competent crew member.
○the completion of a risk assessment for the conduct of tests carried out on the CO2 system.
○The inclusion of procedures for checking the release status of the CO2 system in a safe way and for manually releasing CO2 cylinders in the fire drill scenario framework on board the ships in the Finnlines fleet.
○confirmation that fire drills conducted on the ships in the Finnlines fleet include training in operating quick-closing valves, fire dampers and emergency communication systems.
● Installed a UPS for the UHF repeater system on Finnmaster to ensure its availability in the event of a loss of power from the emergency power supply to the system.
● Provided training to the crew on the configuration and use of the UHF radio system.
● Replaced the EDG circuit breaker and motor module and demonstrated its operation to the satisfaction of a RINA surveyor. Mitsubishi Turbocharger and Engine Europe B.V. has:
● Updated its service instructions for the S12R series of engines to incorporate cautionary notes on the assembly of the fuel injection pump couplings to reduce the likelihood of coupling slippage.
● Updated its training curriculum for its service partners on the SR series of engines, to incorporate specific training on the risk of fuel injection pump slippage and the procedure for disassembly, inspection and assembly of the fuel injection pump couplings.
● Implemented a procedure for the evaluation of service personnel undertaking maintenance of Mitsubishi engines.
98 Det Norske Veritas Group AS has: Completed an additional audit of Geeve Hydraulics B.V. and reinstated the certificate of manufacturer held by the company. The Maritime and Coastguard Agency has: Issued a safety bulletin100, referencing that of the MAIB, advising owners of the need for the testing of CO2 systems in a manner to ensure that the system remains fully functional on the completion of maintenance work on the system. It also reinforced the need for crew to be fully familiar with the manual operation of CO2 systems. 100 https://www.gov.uk/government/publications/safety-bulletin-26-co2-fire-suppression-installation-testing/ safety-bulletin-26-co2-fire-suppression-installation-testing
99 SECTION 5 – RECOMMENDATIONS The Finnish Transport and Communications Agency is recommended to: 2025/135 In consultation with the UK’s Maritime Administration, draft and submit to the appropriate International Maritime Organization sub-committee a paper proposing the production of a circular providing guidance on the conduct and frequency of routine testing of on board emergency power supplies. 2025/136 In consultation with the UK’s Maritime Administration, draft and submit to the appropriate International Maritime Organization sub-committee a paper proposing functional requirements for systems supporting the operation of the two-way portable radiotelephone apparatus required by SOLAS Chapter II-2 Regulation 10.4. 2025/137 In consultation with the UK’s Maritime Administration, propose an amendment to International Maritime Organization Circular MSC.1/Circ.1318 Revision 1 to include procedural requirements to verify that a fixed fire-extinguishing system is fully operational on completion of the servicing activity required by section 6.2.1 of the circular. 2025/138 Define its requirements for the acceptance of the training of service technicians for CO2 fixed fire-extinguishing systems in line with section 6.2 of International Maritime Organization Circular MSC.1/Circ.1318 Revision 1. 2025/139 Disseminate the contents of International Maritime Organization Circular MSC.1/Circ.1321 to the Finnish maritime industry to raise awareness of guidance on the prevention of fires in machinery spaces. Finnlines Plc is recommended to: 2025/140 Provide guidance to its fleet on the identification and reporting of machinery failure trends in order to recognise and address recurring issues in equipment. 2025/141 Update the ship familiarisation and training programmes within its safety management system to encompass all equipment critical to the emergency response procedures and provide a framework for the conduct of realistic drills to ensure crew can react effectively to emergency situations. 2025/142 Ensure that the muster lists used on its ships accurately reflect the response procedures in use on board and that all crew members are included. RINA S.p.A is recommended to: 2025/143 Propose guidance to the International Association of Classification Societies to improve the acceptance, training and guidance for chief engineers authorised to conduct classification-related surveys and inspections. 2025/144 Provide guidance to its surveyors, restating the requirement for the examination of type approval certificates where surveys of safety critical equipment are carried out.
100 2025/145 Disseminate the contents of International Maritime Organization Circular MSC.1/Circ.1321 and related rule requirements to its surveyors to raise awareness of guidance on the prevention of fires in machinery spaces. 2025/146 Noting that the response to previous recommendations has been ineffective in improving the performance of service suppliers conducting servicing of CO2 systems under the provisions of Unified Requirement Z17 – Procedural requirements for service suppliers. Propose to the International Association of Classification Societies that an urgent review and revision of UR-Z17 is undertaken to deliver the necessary improvements in the services provided by such suppliers. Safety recommendations shall in no case create a presumption of blame or liability
Annex A United States Coast Guard Marine Safety Alert 06-17
1 of 2 June 6, 2017 Safety Alert 06-17 Washington, DC Fuel Spray Fire - Déjà Vu Prepare and Prevent it from Happening to You! This safety alert addresses yet another fuel spray fire onboard a commercial vessel. These types of incidents, involving fuel leakages contacting hot surfaces and igniting, happen too frequently and have been a focus of various marine safety organizations such as the IMO for many years. One recent marine casualty involved a 194 GRT inspected offshore supply vessel with an unmanned engine room. This engine room fire led to significant damage, operational down time of the vessel and lost company revenues. Fortunately, no one was injured during this event. Investigators learned that the master received a main engine low fuel pressure alarm on the bridge which was then investigated by the crew. The crew member on watch entered the engine room and identified a high pressure fuel leak spraying over and upon the port engine’s turbocharger. He also reported a large quantity of diesel fuel in the bilge. The master then went down into the engine room and witnessed the ignition of the fire. Using a hand held portable fire extinguisher he quickly attempted to extinguish the fire without success. The master activated the general alarm, secured the hatches, had crew members secure the ventilation dampers and closed the remote fuel shut-off valves to the engine room. The fire then quickly self extinguished. During the post-casualty inspection of the engine room, the source of the fuel leak was identified to be a rupture on a flexible fuel hose connected to the fuel filter assembly. Additionally, it was noted that the fuel filter assembly and its components were installed in relatively close proximity to the turbocharger on the inboard side of the engine. Although components of the turbochargers may be insulated, temperatures on some surfaces typically exceed the fuel’s ignition point. In this instance, the heat radiating from the turbo charger components was very high and likely led to the degradation of the flexible rubberized hoses nearby. However, the installation was confirmed to be in accordance with an accepted location on the manufacturer’s marine engine manual. Following the casualty, the owner/operator of the vessel enacted fleet-wide changes and relocated the fuel filter assemblies away from the turbochargers on the outboard side of the engines in the vicinity of the fuel pumps. Inspections and Compliance Directorate TTuurrbboocchhaarrggeerr IIIn nnsssu uulllaaattteeed dd E EExxxh hhaaau uusssttt P PPiiip ppiiin nng gg R Ruuppttuurreedd FFuueell H Hoossee Image courtesy of United States Coast Guard
Safety Alert 06-17 2 of 2 The U.S. Coast Guard strongly recommends vessel owners and operators to regularly: • Avoid an “out of sight, out of mind mentality.” Unmanned machinery spaces should be inspected at least daily, but preferably several times per day. Those who perform such activities should develop an eye for detail by tracing out and inspecting all equipment, systems, and components. Such spaces should be well lit as good lighting will benefit mindsets of those within the spaces and enhance the ability to detect anomalies. • Inspect fuel and lubricating systems closely from source tanks to system end points. Think about system vulnerabilities, loose or missing pipe clamps and securing devices, wear or chaffing due to vibration impacting hoses, and piping or tubing which may be insufficiently secured. Make sure plastic piping is not close to hot spots. Examine fuel supply pumps, noting shaft sealing for leakages and bearings when fitted, for overheating and indications of wear. Pay similar attention to the pumps and motors associated with other systems. • Regarding hot spots; examine all heat sources particularly with respect to engine exhausts. Look closely at areas where exhaust piping may exit the space and proceed through other spaces. Numerous fires onboard vessels have occurred in these areas. Ensure all insulation, blankets, and lagging are maintained and kept tight. Look for areas where released fluids may make contact. Check that spray shielding is kept in place where used and consider adding such shielding around gasketed flanges and other areas if helpful. • Minimize the use of nonmetallic flexible hoses in systems carrying flammable liquids particularly around engine areas where failures leading to leakage or spray may find hot spots capable of igniting the fluids. Consult with engine representatives if modifications are needed to minimize the risk of fuel spray fires. • In this instance the installed engines and components were about three years old. It may be beneficial for vessel owners to consult with engine manufacturer representatives to determine if a replacement schedule is necessary taking into account hose exposure to heat sources, vibration, and other factors that may degrade the hose strength internally or externally. This safety alert is provided for informational purpose only and does not relieve any domestic or international safety, operational, or material requirements. Developed by Marine Safety Unit Morgan City and distributed by the Office of Investigations and Casualty Analysis. Questions or comments may be sent to HQS-PF-fldr-CG-INV@uscg.mil. Similar alerts are available at the following links: https://www.uscg.mil/hq/cg5/cg545/alerts/1214.pdf https://www.uscg.mil/hq/cg5/cg545/alerts/0508.pdf https://www.uscg.mil/hq/cg5/cg545/alerts/ll1109.pdf H Hoossee R Ruuppttuurree Image courtesy of United States Coast Guard
Annex B IMO Circular MSC.1/Circ.1318 – Guidelines for the Maintenance and Inspections of Fixed Carbon Dioxide Fire-extinguishing Systems
I:\CIRC\MSC\01\1318.doc INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 IMO E Ref: T4/4.01 MSC.1/Circ.1318 11 June 2009 GUIDELINES FOR THE MAINTENANCE AND INSPECTIONS OF FIXED CARBON DIOXIDE FIRE-EXTINGUISHING SYSTEMS 1 The Committee, at its eighty-sixth session (27 May to 5 June 2009), having considered the proposal by the Sub-Committee on Fire Protection, at its fifty-third session, approved Guidelines for the maintenance and inspections of fixed carbon dioxide fire-extinguishing systems, as set out in the annex. 2 Member Governments are invited to apply the annexed Guidelines when inspecting fixed carbon dioxide fire-extinguishing systems on board all ships and bring them to the attention of ship designers, shipowners, equipment manufacturers, and other parties concerned.
Image courtesy of International Maritime Organization
MSC.1/Circ.1318 I:\CIRC\MSC\01\1318.doc ANNEX GUIDELINES FOR THE MAINTENANCE AND INSPECTIONS OF FIXED CARBON DIOXIDE FIRE-EXTINGUISHING SYSTEMS 1 General These Guidelines provide the minimum recommended level of maintenance and inspections for fixed carbon dioxide fire-extinguishing systems on all ships, and are intended to demonstrate that the system is kept in good working order as specified in SOLAS regulation II-2/14.2.1.2. These Guidelines are intended to supplement the fire-extinguishing system manufacturer’s approved maintenance instructions. Certain maintenance procedures and inspections may be performed by competent crewmembers, while others should be performed by persons specially trained in the maintenance of such systems. The onboard maintenance plan should indicate which parts of the recommended inspections and maintenance should be completed by trained personnel. 2 Safety Whenever carbon dioxide fire-extinguishing systems are subjected to inspection or maintenance, strict safety precautions should be followed to prevent the possibility that individuals performing or witnessing the activities are placed at risk. Prior to performing any work, a safety plan should be developed to account for all personnel and establish an effective communications system between the inspection personnel and the on-duty crew. Measures to avoid accidental discharges such as locking or removing the operating arms from directional valves, or shutting and locking the system block valve should be taken as the initial procedure for the protection of personnel performing any maintenance or inspections. All personnel should be notified of the impending activities before work is begun. 3 Maintenance and inspection plan Fixed carbon dioxide fire-extinguishing systems should be kept in good working order and readily available for immediate use. Maintenance and inspections should be carried out in accordance with the ship’s maintenance plan having due regard to ensuring the reliability of the system. The onboard maintenance plan should be included in the ship’s safety management system and should be based on the system manufacturer’s recommendations including: .1 maintenance and inspection procedures and instructions; .2 required schedules for periodic maintenance and inspections; .3 listing of recommended spare parts; and .4 records of inspections and maintenance, including corrective actions taken to maintain the system in operable condition. Image courtesy of International Maritime Organization
MSC.1/Circ.1318 ANNEX Page 2 I:\CIRC\MSC\01\1318.doc 4 Monthly inspections 4.1 At least every 30 days a general visual inspection should be made of the overall system condition for obvious signs of damage, and should include verification that: .1 all stop valves are in the closed position; .2 all releasing controls are in the proper position and readily accessible for immediate use; .3 all discharge piping and pneumatic tubing is intact and has not been damaged; .4 all high pressure cylinders are in place and properly secured; and .5 the alarm devices are in place and do not appear damaged. 4.2 In addition, on low pressure systems the inspections should verify that: .1 the pressure gauge is reading in the normal range; .2 the liquid level indicator is reading within the proper level; .3 the manually operated storage tank main service valve is secured in the open position; and .4 the vapour supply line valve is secured in the open position. 5 Annual inspections The following minimum level of maintenance and inspections should be carried out in accordance with the system manufacturer’s instructions and safety precautions: .1 the boundaries of the protected space should be visually inspected to confirm that no modifications have been made to the enclosure that have created uncloseable openings that would render the system ineffective; .2 all storage containers should be visually inspected for any signs of damage, rust or loose mounting hardware. Cylinders that are leaking, corroded, dented or bulging should be hydrostatically retested or replaced; .3 system piping should be visually inspected to check for damage, loose supports and corrosion. Nozzles should be inspected to ensure they have not been obstructed by the storage of spare parts or a new installation of structure or machinery; .4 the manifold should be inspected to verify that all flexible discharge hoses and fittings are properly tightened; and Image courtesy of International Maritime Organization
MSC.1/Circ.1318 ANNEX Page 3 I:\CIRC\MSC\01\1318.doc .5 all entrance doors to the protected space should close properly and should have warning signs, which indicate that the space is protected by a fixed carbon dioxide system and that personnel should evacuate immediately if the alarms sound. All remote releasing controls should be checked for clear operating instructions and indication as to the space served. 6 Minimum recommended maintenance 6.1 At least biennially (intervals of 2 years ± 3 months) in passenger ships or at each intermediate, periodical or renewal survey* in cargo ships, the following maintenance should be carried out (to assist in carrying out the recommended maintenance, examples of service charts are set out in the appendix): .1 all high pressure cylinders and pilot cylinders should be weighed or have their contents verified by other reliable means to confirm that the available charge in each is above 90% of the nominal charge. Cylinders containing less than 90% of the nominal charge should be refilled. The liquid level of low pressure storage tanks should be checked to verify that the required amount of carbon dioxide to protect the largest hazard is available; .2 the hydrostatic test date of all storage containers should be checked. High pressure cylinders should be subjected to periodical tests at intervals not exceeding 10 years. At the 10-year inspection, at least 10% of the total number provided should be subjected to an internal inspection and hydrostatic test*. If one or more cylinders fail, a total of 50% of the onboard cylinders should be tested. If further cylinders fail, all cylinders should be tested. Flexible hoses should be replaced at the intervals recommended by the manufacturer and not exceeding every 10 years; and .3 the discharge piping and nozzles should be tested to verify that they are not blocked. The test should be performed by isolating the discharge piping from the system and flowing dry air or nitrogen from test cylinders or suitable means through the piping. 6.2 At least biennially (intervals of 2 years ± 3 months) in passenger ships or at each renewal survey in cargo ships, the following maintenance should be carried out by service technicians/specialists trained to standards accepted by the Administration: .1 where possible, all activating heads should be removed from the cylinder valves and tested for correct functioning by applying full working pressure through the pilot lines. In cases where this is not possible, pilot lines should be disconnected from the cylinder valves and blanked off or connected together and tested with full working pressure from the release station and checked for leakage. In both cases this should be carried out from one or more release stations when installed. * Refer to Survey guidelines under the Harmonized System of Survey and Certification, 2007 (resolution A.997(25)). ** Refer to standard ISO 6406 – Periodic inspection and testing of seamless steel gas cylinders. Image courtesy of International Maritime Organization
MSC.1/Circ.1318 ANNEX Page 4 I:\CIRC\MSC\01\1318.doc If manual pull cables operate the remote release controls, they should be checked to verify the cables and corner pulleys are in good condition and freely move and do not require an excessive amount of travel to activate the system; .2 all cable components should be cleaned and adjusted as necessary, and the cable connectors should be properly tightened. If the remote release controls are operated by pneumatic pressure, the tubing should be checked for leakage, and the proper charge of the remote releasing station pilot gas cylinders should be verified. All controls and warning devices should function normally, and the time delay, if fitted should prevent the discharge of gas for the required time period; and .3 after completion of the work, the system should be returned to service. All releasing controls should be verified in the proper position and connected to the correct control valves. All pressure switch interlocks should be reset and returned to service. All stop valves should be in the closed position. Image courtesy of International Maritime Organization
MSC.1/Circ.1318 ANNEX Page 5 I:\CIRC\MSC\01\1318.doc APPENDIX EXAMPLE SERVICE CHARTS HIGH PRESSURE CO2 SYSTEM Date: Name of ship/unit: IMO No.:
Technical description No. Text Value 1 Manufacturer 2 Number of main cylinders 3 Main cylinders capacity (each) 4 Number of pilot cylinders 5 Pilot cylinder capacity (each) 6 Number of distribution lines 7 Oldest cylinder pressure test date 8 Protected space(s) 9 Date flexible hoses fitted/renewed Description of inspection/Tests No. Description Carried out Not carried out Not applicable Comment 1 Release controls and distribution valves secured to prevent accidental discharge
2 Contents in main cylinders checked by weighing
3 Contents in main cylinders checked by liquid level indicator
4 Contents of pilot cylinders checked
5 All cylinder valves visually inspected
6 All cylinder clamps and connections checked for tightness
7 Manifold visually inspected
8 Manifold tested for leakage, by applying dry working air
9 Main valve and distribution valves visually inspected
10 Main valve and distribution valves tested for operation
11 Time delay devices tested for correct setting*
12 Remote release system visually inspected
13 Remote release system tested
14 Servo tubing/pilot lines pressure tested at maximum working pressure and checked for leakages and blockage
15 Manual pull cables, pulleys, gang releases tested, serviced and tightened/adjusted as necessary
16 Release stations visually inspected
17 Warning alarms (audible/visual) tested
18 Fan stop tested*
19 10% of cylinders and pilot cylinder/s pressure tested every 10 years
20 Distribution lines and nozzles blown through, by applying dry working air
21 All doors, hinges and locks inspected*
22 All instruction and warning signs on installation inspected
23 All flexible hoses renewed and check valves in manifold visually inspected every 10 years
24 Release controls and distribution valves reconnected and system put back in service
25 Inspection date tags attached
If fitted as part of the CO2 system. Image courtesy of International Maritime Organization MSC.1/Circ.1318 ANNEX Page 6 I:\CIRC\MSC\01\1318.doc LOW PRESSURE CO2 SYSTEM Date: Name of ship/unit: IMO No.:
Technical description No. Text Value 1 Manufacturer 2 No. of tanks 3 Tanks capacity (tonnes) 4 Number of pilot cylinders 5 Pilot cylinder capacity (each) 6 Number of distribution lines 7 Protected space(s) Description of inspection/Tests No. Description Carried out Not carried out Not applicable Comment 1 Tank main service valve closed and secured to prevent accidental discharge
2 Distribution valves verified closed
3 Check correct function of level indicator
4 Contents of CO2 tank checked by tank level indicator
5 Contents of CO2 tank checked by riser tube reading
6 Contents of CO2 tank checked by level control valve
7 Supports of tank inspected
8 Insulation on tank inspected
9 Safety valves of tank inspected
10 Safety valves of tank tested
11 Contents of pilot cylinders checked
12 Start/stop function of cooling compressors tested
13 All connected electrical alarms and indicators tested
14 Main manifold valve inspected
15 Main manifold valve tested
16 Distribution valves inspected
17 Distribution valves tested
18 Release stations inspected
19 Total flooding release mechanism inspected
20 Total flooding release mechanism tested
21 Time delay devices tested for correct setting*
22 Warning alarms tested
23 Fan stop tested*
24 Distribution lines and nozzles inspected
25 Distribution lines and nozzles tested
26 Distribution lines and nozzles blown through
27 All doors, hinges and locks inspected*
28 All instruction plates inspected
29 Tank main service valve reopened and secured open
30 System put back in service
31 Inspection date tags attached
* If fitted as part of the CO2 system.
Image courtesy of International Maritime Organization
Annex C Geeve Hydraulics B.V. flexible hose assembly test certificate – July 2020
Image courtesy of Geeve Hydraulics B.V.
Annex D DNV CO2 system flexible hose type approval certificate – issued December 2017
Form code: TA 251 Revision: 2016-12 www.dnvgl.com Page 1 of 3
© DNV GL 2014. DNV GL and the Horizon Graphic are trademarks of DNV GL AS. TYPE APPROVAL CERTIFICATE Certificate No: TAP000013G This is to certify: That the Flexible Hoses of Non-Metallic Material with Permanently Fitted Couplings with type designation(s) 301SN/301TC, 421SN Issued to Parker Hannifin Manufacturing S.r.l. Veniano CO, Italy is found to comply with DNV GL rules for classification – Ships Pt.4 Ch.6 Piping systems DNVGL-OS-D101 – Marine and machinery systems and equipment, Edition July 2015 DNV GL class programme DNVGL-CP-0183 – Type approval – Flexible hoses Application : Product(s) approved by this certificate is/are accepted for installation on vessels classed by DNV GL. Type: Temperature range: Max. working press.: Sizes: 301SN/301TC -40 ºC to 100 ºC (dependent on medium) 80 to 400 bar (dependent on size) DN6, 8, 10, 12, 16, 19, 25, 31, 38, 51 421SN -40 ºC to 100 ºC (dependent on medium) 40 to 225 bar (dependent on size) DN6, 8, 10, 12, 16, 19, 25, 31, 38, 51
Issued at Høvik on 2017-12-28 for DNV GL
This Certificate is valid until 2022-12-27. DNV GL local station: Milan Approval Engineer: Head of Section This Certificate is subject to terms and conditions overleaf. Any significant change in design or construction may render this Certificate invalid. The validity date relates to the Type Approval Certificate and not to the approval of equipment/systems installed.
Image courtesy of DNV
Job Id: 262.1-016585-4 Certificate No: TAP000013G
Form code: TA 251 Revision: 2016-12 www.dnvgl.com Page 2 of 3 Product description 301SN and 301TC according to EN 853 2SN – ISO 1436 2SN: Synthetic rubber inner tube, two braids of high tensile steel wire reinforcement separated by a synthetic rubber layer. Oil, weather fire and abrasion resistant synthetic rubber black outer cover. 421SN according to EN 853 1SN – ISO 1436 1SN: Synthetic rubber inner tube - one braid of high tensile steel wire reinforcement. Oil, weather , fire and abrasion resistant synthetic rubber black outer cover. Couplings Parker couplings series 48 made of carbon or 316 stainless steel (for both types 301SN/TC &421SN) Hoses made by: Parker Hannifin, Italy Couplings made by: Parker Hannifin, Germany Application/Limitation This certificate is valid for the specific assembly of hose and coupling type as specified, assembled and delivered by the holder (named as manufacturer) of this certificate. The hose may be used for the following application: Petroleum base hydraulic fluids, water glycol and water oil emulsion hydraulic fluids, compressed air & fresh water. Maximum working pressure: 301SN/TC 421SN Hose size (DN) Designation Max working pressure (bar) Designation Max working pressure (bar) 6 301SN-4 301TC-4 400 421SN-4 225 8 301SN-5 301TC-5 350 421SN-5 215 10 301SN-6 301TC-6 330 421SN-6 180 112 301SN-8 301TC-8 275 421SN-8 160 16 301SN-10 301TC-10 250 421SN-10 130 19 301SN-12 301TC-12 215 421SN-12 105 25 301SN-16 301TC-16 165 421SN-16 88 31 301SN-20 301TC-20 125 421SN-20 63 38 301SN-24 301TC-24 90 421SN-24 50 51 301SN-32 301TC-32 80 421SN-32 40 Temperature range: Medium: Temperature range: Petroleum base hydraulic fluids -40 ºC to 100 ºC Water and water based hydraulic fluids -40 ºC to 85 ºC Compressed air -40 ºC to 70 ºC Each hose assembly is before delivery to be hydraulic pressure tested to 1.5 times the maximum working pressure and to be delivered with the pressure test report with reference to this type approval certificate. Flexible hoses are only to be used where it is necessary due to vibrations or flexible mounting of the machinery. The hoses shall not replace/be used where permanent piping is possible/required and must only be fitted in places where they are always accessible. Flexible hoses of these types are not to be used in boiler fronts. Hoses covered by this certificate shall not be installed in systems with pressure below atmospheric or vacuum conditions. The hoses are to be mounted in accordance with the manufacturer's instructions. Image courtesy of DNV
Job Id: 262.1-016585-4 Certificate No: TAP000013G
Form code: TA 251 Revision: 2016-12 www.dnvgl.com Page 3 of 3 The cover of hoses for gaseous applications shall be pin-pricked. Type Approval documentation Tests carried out Dimensional Check, Proof Pressure, Change in Length, Burst, Cold Flex, Oil Resistance, Ozone Resistance, Cover- and Tube- Adhesion Test, Impulse and Fire Test. Marking of product For traceability to this type approval the products are at least to be marked with:
- Manufacturer's name or trade mark
- Type designation
- Maximum working pressure
- Size
Periodical assessment For retention of the Type Approval, a DNV GL Surveyor shall perform periodical assessment after two years (+/- 90 days) and after 3.5 years (+/- 90 days) to verify that the conditions for the approval are complied with. Reference is made to DNVGL-CP-0338. Image courtesy of DNV
Annex E Geeve Hydraulics B.V. flexible hose assembly test certificate – February 2021
Image courtesy of Geeve Hydraulics B.V.
Annex F DNV CO2 system flexible hose type approval certificate – issued September 2020
Form code: TA 251 Revision: 2020-02 www.dnvgl.com Page 1 of 3 © DNV GL 2014. DNV GL and the Horizon Graphic are trademarks of DNV GL AS. TYPE APPROVAL CERTIFICATE Certificate No: TAP00001JV Revision No: 1 This is to certify: That the Flexible Hoses of Non-Metallic Material with Permanently Fitted Couplings with type designation(s) 421TC, 421SN Issued to Parker Hannifin Manufacturing S.r.l. Veniano CO, Italy is found to comply with DNV GL rules for classification – Ships Pt.4 Ch.6 Piping systems DNVGL-OS-D101 – Marine and machinery systems and equipment, Edition January 2018 DNV GL class programme DNVGL-CP-0183 – Type approval – Flexible hoses Application : Product(s) approved by this certificate is/are accepted for installation on vessels classed by DNV GL. Type: Temperature range: Max. working press.: Sizes: 421TC -40°C to +100°C See page 2 DN6, 10, 12 421SN -40°C to +100°C See page 2 DN6, 10, 12
Issued at Høvik on 2020-09-09 for DNV GL
This Certificate is valid until 2025-04-21. DNV GL local station: Italy/Malta CMC Approval Engineer: Head of Section
This Certificate is subject to terms and conditions overleaf. Any significant change in design or construction may render this Certificate invalid. The validity date relates to the Type Approval Certificate and not to the approval of equipment/systems installed.
LEGAL DISCLAIMER: Unless otherwise stated in the applicable contract with the holder of this document, or following from mandatory law, the liability of DNV GL AS, its parent companies and subsidiaries as well as their officers, directors and employees (“DNV GL”) arising from or in connection with the services rendered for the purpose of the issuance of this document or reliance thereon, whether in contract or in tort (including negligence), shall be limited to direct losses and under any circumstance be limited to 300,000 USD. Image courtesy of DNV
Job Id: 262.1-029344-2 Certificate No: TAP00001JV Revision No: 1 Form code: TA 251 Revision: 2020-02 www.dnvgl.com Page 2 of 3 Product description Synthetic rubber hoses with one braid wire reinforcement designed according to EN 853 1SN. Materials: Inner tube: Nitrile rubber (NBR) Reinforcement: One braid of steel wire Cover 421SN: Perforated cover of synthetic rubber Cover 421TC: MSHA approved synthetic rubber, tough cover Couplings: Parker Coupling Series 48 (material – stainless steel: 1.4571, 1.4404, 1.4401, carbon steel: 1.0718, 1.0715, SAE1137, 1.0765, 1.0581, 1.0255, 1.0303, 1.0504, 1.7225, 1.7131) Manufacturing location for hose and end fittings: Parker Hannifin Manufacturing S.r.l 6 Via Giovanni Battista Pirelli Veniano, CO, 22070 Italy Application/Limitation This certificate is valid for the specific assembly of hose and coupling type as specified, assembled and delivered by the holder (named as manufacturer) of this certificate. Maximum working pressure at room temperature: Size DASH DN 421 TC 421 SN 4 6 225 bar 225 bar 6 10 180 bar 180 bar 8 12 160 bar 160 bar Hose assemblies covered by this certificate are approved to be used as flexible connections between bottle valve and manifold in CO2 fire extinguishing systems. The cover of the hoses shall be pin-pricked. This certificate is valid for the specific assembly of hose and coupling type as specified, assembled and delivered by the holder (named as manufacturer) of this certificate. Flexible hoses are only to be used where it is necessary due to vibrations or flexible mounting of the machinery. The hoses shall not replace/be used where permanent piping is possible/required. The hose assemblies must only be fitted on places where they are always accessible for inspection and shall be mounted according to the manufacturer’s instructions. The outer end of the pipe coupling (performing the connection to the fixed piping) is not covered by this
certificate and shall follow the below requirements:
Flanged ends shall be according to a recognized standard
Slip-on threaded joints having pipe threads where pressure-tight joints are made on the threads with parallel or tapered threads, shall comply with requirements of a recognized standard.
Limitations stated in DNVGL-RU-SHIP Pt.4 Ch.6 Sec.9 [5.6.2] to be followed.
If these outer ends are going to be part of a mechanical joint as covered by DNVGL-RU-SHIP Pt.4 Ch.6 Sec.9 [Table 10], then they shall be separately type approved. Production testing Each hose assembly shall be hydrostatically tested at a pressure of 1.5 times the maximum working pressure and be delivered with the pressure test report with reference to this type approval certificate. Image courtesy of DNV
Job Id: 262.1-029344-2 Certificate No: TAP00001JV Revision No: 1 Form code: TA 251 Revision: 2020-02 www.dnvgl.com Page 3 of 3 Type Approval documentation Tests carried out Dimensional check, change in length, leakage test, cold flexibility, resistance against liquids, cover adhesion, vacuum test, ozone resistance, fire test, impulse, burst at minimum design temperature, endurance test with liquid carbon dioxide Marking of product
For traceability to this type approval the products are to be marked with:
Hose manufacturer’s name or trademark;
Date of manufacture (month/year);
Designation type reference;
Nominal diameter;
Pressure rating;
Temperature rating. Periodical assessment For retention of the Type Approval, a DNV GL Surveyor shall perform periodical assessment after two years (+/- 90 days) and after 3.5 years (+/- 90 days) to verify that the conditions for the approval are complied with. Reference is made to DNVGL-CP-0338. Image courtesy of DNV
Annex G RINA CO2 system flexible hose type approval certificate – issued July 2015
RINA Services S.p.A. Via Corsica, 12 - 16128 Genova Tel +39 010 53851 Fax +39 010 5351000 TYPE APPROVAL CERTIFICATE No. MAC176015CS/004 This is to certify that the product identified below is in compliance with the regulations herewith specified. Description Non metallic flexible hoses Type 421SN Applicant PARKER HANNIFIN MANUFACTURING SRL VIA G.B. PIRELLI, 6 22070 VENIANO (CO) ITALY Manufacturer Place of manufacture PARKER HANNIFIN MANUFACTURING SRL VIA G.B. PIRELLI, 6 22070 VENIANO (CO) ITALY Reference standards RINA Rules for the Type Approval of Flexible Hoses and Expansion Joints
Issued in Genoa on July 24, 2015. This Certificate is valid until July 23, 2020
RINA Services S.p.A. This certificate consists of this page and 1 enclosure Image courtesy of RINA
RINA Services S.p.A. Via Corsica, 12 - 16128 Genova Tel +39 010 53851 Fax +39 010 5351000 TYPE APPROVAL CERTIFICATE No. MAC176015CS/004 Enclosure - Page 1 of 2 421SN Reference documents Parker Hannifin specifications nos. Hs-421SN and HS-K48 Test Reports Nos. 1364, 1365, 1366 and 1367 of 03/08/2004. Test Report No. 2009/CS/4434 of 11/02/2010 of RINA Milan Office. Reference Standard EN 853 - 1SN. Materials/components Lining: Nitrile based synthetic rubber oil resistant Reinforcement: One braid of high tensile steel wire Cover: Black synthetic rubber resistant to oils and weathering End fittings: Parker 48 series - Material: Steel (9SMnPb28 UNI 4838 or equivalent) - Stainless steel (316). Technical characteristics Maximum allowable working pressure at ambient temperature according to the following table: Item Nominal Diameter (mm) Inside Diameter (mm) Max. working pressure (N/mm 2) -3 5 4.6 25 -4 6.3 6.2 22.5 -5 8 7.7 21.5 -6 10 9.3 18 -8 12.5 12.3 16 -10 16 15.5 13 -12 19 18.6 10.5 -16 25 25.0 8.8 -20 31.5 31.4 6.3 -24 38 37.7 5 -32 51 50.4 4 Working temperature: -40°C to +100°C Image courtesy of RINA
RINA Services S.p.A. Via Corsica, 12 - 16128 Genova Tel +39 010 53851 Fax +39 010 5351000
Fields of application Hydraulic systems with a hydraulic oil having a flash point not less than 150°C. TYPE APPROVAL CERTIFICATE No. MAC176015CS/004 Enclosure - Page 2 of 2 421SN Acceptance Conditions The installation on board of the piping system is to be carried out by qualified personnel in accordance with the manufacturer's instructions. The flexible hoses are to be installed in order to satisfy the requirements of para. 5.9.3 of Part C, Ch 1, Sec 10 of RINA Rules. The acceptance of the a.m. products on board ship and other units classified with RINA is subject to the satisfactory outcome of testing as per RINA Rules. The product (hose and fittings) is to be marked, for traceability, with the following data: nominal diameter, design conditions, Manufacturer's name or trademark, designation type reference. Remarks This certificate annuls and replaces the previous certificate No. MAC443409CS/004 issued on 5 March 2010. Genoa July 24, 2015 Image courtesy of RINA
Annex H RINA CO2 system flexible hose type approval certificate – issued November 2020
Image courtesy of RINA
} ~
¡ ¢ £ ¤ ¥ ¦ § ¨ ¥ © ¤ ª « © © ¥
Image courtesy of RINA
} ~
¡ ¢ £ ¤ ¥ ¦ § ¨ ¥ © ¤ ª « © © ¦
Image courtesy of RINA
Annex I DNV approval of manufacturer certificate
Form code: AM 301 Revision: 2020-01 www.dnvgl.com Page 1 of 2
© DNV GL 2014. DNV GL and the Horizon Graphic are trademarks of DNV GL AS. APPROVAL OF MANUFACTURER CERTIFICATE Certificate No: AMT0000051 Revision No: 1 This is to certify: That the Manufacturer Geeve Hydraulics B.V. ROTTERDAM, Zuid-Holland, Netherlands is approved for the Assembling of type approved hoses and couplings The approval is granted on condition that DNV GL class programme DNVGL-CP-0183 – Type approval – Flexible hoses are complied with in all respect Type Size 462TC DN 6 to DN 48 492 DN 6 to DN 25 387TC DN 4 to DN 32 301SN, 421SN DN 6 to DN 51 811 DN 19 to DN 125 372 DN 10 to DN 31 H31 DN 6 to DN 25 H29 DN 19 to DN 51 R42 DN 16 to DN 51 520N DN 3 to DN 16 421SN DN 6 to DN 12 2245N DN 6 to DN 25 787TC, 797TC DN 6 to DN 51 R35TC DN 12 to DN 48 471TC DN 6 and DN 10 to DN 51 701 DN 12 to DN 40
Manufacturer(s) approved by this certificate is/are accepted to deliver according to DNV GL, DNV and GL rules.
Issued at Høvik on 2020-11-30 for DNV GL
This Certificate is valid until 2023-07-24. DNV GL local station: Netherlands CMC Approval Engineer: Head of Section LEGAL DISCLAIMER: Unless otherwise stated in the applicable contract with the holder of this document, or following from mandatory law, the liability of DNV GL AS, its parent companies and subsidiaries as well as their officers, directors and employees (“DNV GL”) arising from or in connection with the services rendered for the purpose of the issuance of this document or reliance thereon, whether in contract or in tort (including negligence), shall be limited to direct losses and under any circumstance be limited to 300,000 USD. This Certificate is subject to terms and conditions overleaf. Any significant change in production facilities and methods may render this Certificate invalid. Image courtesy of DNV
Job Id: 263.11-007138-2 Certificate No: AMT0000051 Revision No: 1 Form code: AM 301 Revision: 2020-01 www.dnvgl.com Page 2 of 2 Approval basis Geeve Hydraulics B.V. is approved as a hose assembling company to deliver type approved hose assemblies (hose & coupling types as described in this certificate) to DNV GL vessels. Products Holder of this certificate is authorized to assemble hoses and end fittings as specified in below type approval certificates with subsequent identical revisions (as long as there is no change in the design of the products): TAC Holder Type Approval Certificate Expiry date Type Size 462TC DN 06 to DN 76 TAP000000E 2022-06-30 492 DN 06 to DN 31 TAP000008S 2021-02-11 387TC DN 04 to DN 32 301SN DN 06 to DN 51 TAP000013G 2022-12-17 421SN DN 06 to DN 51 TAP0000158 2022-06-30 811 DN 19 to DN 125 TAP000016X 2022-12-27 372 DN 10 to DN 31 H31 DN 06 to DN 25 TAP000016Y 2022-12-27 H29 DN 19 to DN 51 TAP000016Z 2022-12-27 R42 DN 16 to DN 51 TAP00001AR 2023-06-30 520N DN 03 to DN 16 TAP00001JV 2025-04-21 421SN DN 06 to DN 12 TAP00001M6 2024-01-20 2245N DN 06 to DN 25 787TC DN 06 to DN 51 TAP000013N 2022-11-08 797TC DN 06 to DN 51 TAP00001N8 2023-12-31 R35TC DN 12 to DN 48 TAP00001R6 2024-03-10 471TC DN 06 and DN 10 to DN 51 Parker Hannifin Manufacturing S.r.l. TAP00000TU 2022-02-15 701 DN 12 to DN 40 Limitation The approval is valid by considering all conditions in relevant type approval certificates during the validity of current certificate as well as the relevant type approval certificates & authorization letter. Production testing Each hose assembly is to be hydraulic pressure tested to 1.5 times the maximum working pressure before delivery and to be delivered from the certificate holder with pressure test report with reference to the type approval certificate and this certificate. Approval documentation Certificate Retention Survey The AoM certificate is valid for three years with no intermediate assessment unless otherwise requested by the Society. Image courtesy of DNV
Annex J Schneider Electric Fault Analysis Report reference RM22212514
Image courtesy of Schneider Electric
Image courtesy of Schneider Electric
Image courtesy of Schneider Electric
Image courtesy of Schneider Electric
Image courtesy of Schneider Electric
Image courtesy of Schneider Electric
Image courtesy of Schneider Electric
Annex K MAIB Safety Bulletin SB1/2022, issued 10 March 2022
M A R I N E A C C I D E N T I N V E S T I G AT I O N B R A N C H SAFETY BULLETIN SAFETY BULLETIN SB1/2022 MARCH 2022 Extracts from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 Regulation 5: “The sole objective of a safety investigation into an accident under these Regulations shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of such an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” Regulation 16(1): “The Chief Inspector may at any time make recommendations as to how future accidents may be prevented.” Press Enquiries: +44 (0)1932 440015 Out of hours: +44 (0)300 7777878 Public Enquiries: +44 (0)300 330 3000 NOTE This bulletin is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2022 See http://www. nationalarchives.gov.uk/doc/ open-government-licence for details. All bulletins can be found on our website: https://www.gov.uk/maib For all enquiries: Email: maib@dft.gov.uk Tel: +44 (0)23 8039 5500 Blockage of fixed CO2 fire extinguishing system pilot hoses identified following a fire on board the roll-on/roll-off cargo ship Finnmaster in Hull, England on 19 September 2021 Section through blocked CO2 pilot hose coupling showing incomplete bore through the stem
MAIB SAFETY BULLETIN 1/2022 This document, containing safety lessons, has been produced for marine safety purposes only, on the basis of information available to date. The Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 provides for the Chief Inspector of Marine Accidents to make recommendations or to issue safety lessons at any time during the course of an investigation if, in his opinion, it is necessary or desirable to do so. The Marine Accident Investigation Branch is carrying out an investigation into the fire on board the roll-on/roll-off cargo ship Finnmaster in Hull, England, on 19 September 2021. The MAIB will publish a full report on completion of the investigation. Captain Andrew Moll Chief Inspector of Marine Accidents NOTE This bulletin is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall not be admissible in any judicial proceedings whose purpose, or one of whose purposes, is to apportion liability or blame. This bulletin is also available on our website: www.gov.uk/maib Press Enquiries: 01932 440015 Out of hours: 0300 7777878 Public Enquiries: 0300 330 3000
1 BACKGROUND On 19 September 2021, a fire broke out in the auxiliary engine room on board the Finland registered roll-on/roll-off cargo ship Finnmaster while departing Hull, England. The crew contained the fire and discharged the machinery space’s carbon dioxide (CO2) fire extinguishing system. Only half of the assigned CO2 cylinders discharged, and the crew had to re-enter the space wearing breathing apparatus to fully extinguish the fire. Finnmaster was operated by Finnlines Oyj (Finnlines) and was equipped with a fixed high- pressure CO2 fire extinguishing system that provided protection for the ship’s machinery spaces, encompassing the main engine room and the auxiliary engine room, and the two cargo holds. The system was designed to be activated remotely via a network of pilot lines and gas activated cylinder valves (Figure 1). INITIAL FINDINGS The initial MAIB investigation identified that one of the auxiliary engine room’s CO2 system pilot hoses was completely blocked. Subsequent examination and testing of Finnmaster’s fixed fire extinguishing systems identified two other hoses on the cargo hold pilot line system that were blocked. Radiographic images taken of the blocked hoses (Figures 2 and 3) showed that the pilot hose couplings had not been fully bored through during the manufacturing process. The testing process also identified several coupling leaks in the pilot lines. In March 2021, the pilot hoses had been replaced during a routine service conducted on board Finnmaster by the marine fire service section of Viking Life-Saving Equipment Oy Finland (Viking). The tests carried out by Viking during the service did not identify any faults with the system. Following the accident, Viking tested the high-pressure CO2 fire extinguishing systems on board the remainder of the Finnlines fleet and identified two similar pilot hoses that were blocked on one of the operator’s ships. All the affected hose assemblies had been supplied to Viking by Geeve Hydraulics B.V. (Geeve), based in the Netherlands. The hose assemblies had been produced under the terms of the classification society type approval held by Geeve. Although the type approval required each completed hose assembly to be pressure tested, there was no specific test that gas could pass freely through the hose assemblies. The hose used in the assemblies was provided in accordance with the type approval held by Geeve. However, Geeve had purchased the couplings from HSR Hydraulics B.V. in the Netherlands, who had sourced the couplings from a different manufacturer. SAFETY ISSUES Safety issues identified during the initial stages of the investigation included:
● The quality assurance processes of the pilot hose assembly supplier did not identify that the hose couplings had not been fully bored through.
● Viking’s onboard installation testing processes did not identify both that some of the hose assemblies were blocked and that there were leaks in the CO2 system pilot lines.
2 Figure 1: Part of the Finnmaster CO2 fire extinguishing system post-accident Open cylinder valve Closed cylinder valve Pilot hoses Outlet hose Main manifold
3 Figure 2: CO2 pilot hose coupling, showing clear passage through the stem Figure 3: CO2 pilot hose coupling, showing incomplete bore through the stem Coupling Ferrule Reinforced hose Stem Blocked section of stem ACTION TAKEN BY THE MAIB The MAIB has: Contacted the companies identified as having been supplied with the affected hose assemblies to make them aware that these assemblies may be blocked and to recommend that they take immediate remedial action in accordance with recommendation S2022/107M, as detailed below. ACTIONS TAKEN BY OTHER ORGANISATIONS Geeve Hydraulics B.V. has:
● Discontinued the supply of the affected hose assemblies.
● Amended its testing procedure to incorporate a pneumatic flow test of the complete hose assemblies to verify that they are not blocked.
4 Finnlines Oyj has: Issued instructions to its fleet to ensure that crews on board its vessels are fully acquainted with the procedures for the manual activation of CO2 fire extinguishing systems in the event of the pilot actuation system failing. Viking Life-Saving Equipment Oy Finland has: Amended its procedures for the servicing of high-pressure CO2 systems to incorporate a positive test for blockages of the pilot system pipework. It has also issued a health and safety awareness notice highlighting the issues identified. RECOMMENDATIONS Geeve Hydraulics B.V. is recommended to: S2022/105 Provide a copy of this safety bulletin to all customers supplied with hose assemblies fitted with couplings supplied by HSR Hydraulics B.V. that do not meet the required type approval, and draw attention to the safety issues raised and the need for immediate action to identify and rectify any defects found in safety critical systems. S2022/106 Amend its purchasing and quality control procedures to ensure that hose assembly components are procured in accordance with the relevant type approval requirements. All companies identified as having been supplied with the affected hose assemblies by Geeve Hydraulics B.V., with couplings sourced from HSR Hydraulics B.V., are recommended to: S2022/107M Take immediate remedial action to identify and rectify any blocked pilot hose assemblies and pilot system leaks on potentially affected CO2 fire extinguishing systems. REQUEST FOR INFORMATION To assist this investigation, it is requested that service providers, owners and operators pass details of any blocked pilot system hose assemblies that they find to the MAIB. Email maib@dft.gov.uk with the title ‘CO2 Pilot System Hose Assembly Issues’ and include the name of the vessel, the date and place of installation of the affected hose assemblies, and details of the defects identified. This information is for internal use only and will be treated in strict confidence. Issued March 2022 Safety recommendations shall in no case create a presumption of blame or liability
Annex L MAIB Safety Bulletin SB1/2023, issued 23 March 2023
M A R I N E A C C I D E N T I N V E S T I G AT I O N B R A N C H SAFETY BULLETIN SAFETY BULLETIN SB1/2023 MARCH 2023 Potential fire hazards from flexible hose installations identified following a fire on board the roll-on/roll-off cargo ship Finnmaster in Hull, England on 19 September 2021 Extracts from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 Regulation 5: “The sole objective of a safety investigation into an accident under these Regulations shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of such an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” Regulation 16(1): “The Chief Inspector may at any time make recommendations as to how future accidents may be prevented.” Press Enquiries: +44 (0)1932 440015 Out of hours: +44 (0)300 7777878 Public Enquiries: +44 (0)300 330 3000 NOTE This bulletin is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2023 See http://www. nationalarchives.gov.uk/doc/ open-government-licence for details. All bulletins can be found on our website: https://www.gov.uk/maib For all enquiries: Email: maib@dft.gov.uk Tel: +44 (0)23 8039 5500 Finnmaster’s fire-damaged compartment
MAIB SAFETY BULLETIN 1/2023 This document, containing safety lessons, has been produced for marine safety purposes only, on the basis of information available to date1. The Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 provide for the Chief Inspector of Marine Accidents to make recommendations at any time during the course of an investigation if, in his opinion, it is necessary or desirable to do so. The Marine Accident Investigation Branch is carrying out an investigation into the fire on board the roll-on/roll-off cargo ship Finnmaster in Hull, England, on 19 September 2021. The MAIB will publish a full report on completion of the investigation. Captain Andrew Moll OBE Chief Inspector of Marine Accidents NOTE This bulletin is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall not be admissible in any judicial proceedings whose purpose, or one of whose purposes, is to apportion liability or blame. This bulletin is also available on our website: www.gov.uk/maib Press Enquiries: 01932 440015 Out of hours: 0300 7777878 Public Enquiries: 0300 330 3000 1 A previous safety bulletin, issued by MAIB in March 2022, focused on separate safety issues arising from this accident: https://www.gov.uk/maib-reports/safety-warning-issued-after-discovery-of-blocked-fixed-co2-fire-extinquishing-system-pilot- hoses
1 BACKGROUND On 19 September 2021, a fire broke out in the auxiliary engine room on board the Finland registered roll-on/roll-off cargo ship Finnmaster while departing Hull, England. The fire was contained and subsequently extinguished without injury to the crew, but the equipment in the auxiliary engine room suffered serious damage (Figure 1). Finnmaster’s auxiliary engine room was equipped with two main alternators. These were driven by marine gas oil (MGO) fuelled engines and named as auxiliary engine 1 (AE1) and auxiliary engine 2 (AE2). Each auxiliary engine comprised 12 cylinders in a v-shaped configuration and was rated at 1100 kilowatts. A fuel supply pump supplied the MGO to both auxiliary engines. The fuel supply pipe was then routed to an inboard and outboard set of cartridge filters2 and a high-pressure fuel injection pump, which were mounted on either side of each engine (Figure 2). 2 A disposable filter insert contained within a housing. Figure 1: Damage sustained to auxiliary engine room For illustrative purposes only: not to scale Figure 2: Schematic diagram of auxiliary engine fuel supply system MGO service tank To auxiliary engine 1 Auxiliary engine 2 Remote closing valve Fuel suction filter Fuel supply pump Fuel pressure gauge Fuel pressure switch Flexible fuel hose assembly Alternator Flexible fuel hose assembly Fuel injection pump Fuel cartridge filter Turbochargers
2 INITIAL FINDINGS The MAIB investigation identified that the fire started below the outboard turbocharger of AE2 when a small-bore flexible fuel hose failed. Exhaust gas had leaked from the outlet of the turbocharger and caused the fuel hose to overheat and fail allowing MGO to spray onto a high temperature surface, where it ignited and a significant fire developed. Auxiliary engine alarm system modifications Maintenance records showed that the alarm system for both auxiliary engines had been modified between April 2003 and July 2006, when Finnmaster was under different ownership. Low pressure fuel alarm pressure switches and gauges had been installed to both AE1 and AE2 to alert the ship’s engineers should the fuel cartridge filters become blocked. The flexible fuel hose that failed in the accident was connected to the outlet from the inboard set of AE2 cartridge filters (Figure 3a); the hose was routed aft along the engine and passed over the top of the flywheel cover under the turbochargers (Figures 3b and 3c). It then connected to a pressure sensor on an instrument panel mounted outboard of the AE2 alternator. Both this hose and the matching hose on AE1 were 3.4m in length. No isolation valve was installed at the connection to the cartridge filters. The thermal insulation that covered the auxiliary engine turbochargers had also been modified by the installation of bespoke insulation pads over the existing insulated box structure. The flexible fuel hose from the AE2 inboard fuel cartridge filters was routed under these insulation pads. Regulation and guidance SOLAS Convention3 Chapter II-2: Construction – Fire protection, fire detection and fire extinction, permitted the restricted use of flexible hose assemblies in positions where the Administration is satisfied that they are necessary, and that, oil fuel lines shall not be located immediately above or near units of high temperature. The International Maritime Organization (IMO) provided guidance on compliance with SOLAS on the use of flexible hose assemblies through its Maritime Safety Committee (MSC). In June 1994, the committee issued circular MSC/Circ.647 – Guidelines to Minimize Leakages from Flammable Liquid Systems. This stated that flexible hose assemblies should be in as short lengths as practicable and only used where necessary to accommodate relative movement between fixed piping and machinery parts. In June 2009, the MSC consolidated the IMO’s guidance on fire safety into circular MSC.1/Circ.1321 – Guidelines for Measures to Prevent Fires in Engine- Rooms and Cargo Pump-Rooms. This circular stated that, in addition to the requirements of MSC/Circ.647, flexible hoses should not, in general, exceed 1.5m in length. It further advised that hoses should be constructed to a recognized standard and be approved as suitable for the intended service, taking into account fire resistance, pressure, temperature, fluid compatibility and mechanical loading including impulse where applicable. 3 The International Convention for the Safety of Life at Sea (SOLAS), 1974, as amended.
3 The IMO guidance on flexible hose installations, including the limitation of length, were incorporated into the rules of the two classification societies that provided oversight of Finnmaster during the period that the flexible hoses were in place on the vessel. Figure 3: Small-bore flexible fuel hose assembly on AE2, as indicated by dashed orange line Inboard turbocharger Inboard turbocharger insulation pads Outboard turbocharger Outboard turbocharger insulation pads Fuel pressure switch Fuel pressure gauge Fuel pressure connection to cartridge filter Flexible fuel hose assembly Flexible fuel hose assembly a b c
4 FINDINGS In this case, the flexible hose assemblies were not needed to accommodate relative movement between fixed piping and machinery parts over their entire length between the cartridge filters and the instrument panel. Furthermore, the routing of the hoses under the turbochargers covered by the insulation pads exposed them to the risk of contact with high temperatures and also made them difficult to inspect. SOLAS, IMO guidance, and classification society rules all provided the means to ensure that systems are designed, installed and maintained so as to reduce the risk of fires in machinery spaces. The MAIB investigation into the modifications to the auxiliary engine alarm system is ongoing, but has established that the initial proposal to modify the system on board Finnmaster had not been submitted to the classification society for approval and the installation was not surveyed on completion. Although the flexible fuel hose was subsequently replaced a number of times during the period of over 15 years before the accident, its material, length and routing had remained the same throughout. Furthermore, the risk that the flexible fuel hoses posed to the safety of the vessel had not been identified or mitigated. SAFETY LESSONS
● The risks associated with a modification on safety critical equipment should be considered before and during the work being completed. In this case, the positioning of the fuel pressure gauges and pressure switches required the pressure signal to be transferred from one side of the engine to the other. The relocation of the pressure switch closer to the cartridge filters would have removed the need for a long hose; if this was not possible, a rigid metal pipe secured with clamps and routed at an appropriate distance from the engine’s exhaust might have been a safer option.
● Flexible hoses are recognised as having a higher risk of failure than a properly fitted metal pipe. An isolation valve fitted at the point of supply allows a flexible hose to be safely isolated in the event of leakage.
● Flag state administrations, ship operators, classification societies, marine surveyors and port state control officers are advised of the risks posed by flexible hose assemblies used in systems that carry flammable liquids if they are not installed and maintained in accordance with IMO MSC.1/Circ.1321. Issued March 2023
Marine Accident Report
FD06081 | 2025_英国_safety-warning-issued-following-egyptian-liveaboard-dive-boat-accidents-in-the-red-sea-res.pdf
分类:06_境外及港澳台调查报告 | 年份:2025 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
Extracts from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 Regulation 5: “The sole objective of a safety investigation into an accident under these Regulations shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of such an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” Regulation 16(1): “The Chief Inspector may at any time make recommendations as to how future accidents may be prevented.” NOTE This bulletin is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2025 See http://www. nationalarchives.gov.uk/doc/ open-government-licence for details. All bulletins can be found on our website: https://www.gov.uk/maib For all enquiries: Email: maib@dft.gov.uk Tel: +44 (0)23 8039 5500 Press Enquiries: +44 (0)19 3244 0015 Out of hours: +44 (0)30 0777 7878 Public Enquiries: +44 (0)30 0330 3000 M A R I N E A C C I D E N T I N V E S T I G AT I O N B R A N C H SAFETY BULLETIN SAFETY BULLETIN SB1/2025 FEBRUARY 2025 Safety issues on Egyptian liveaboard dive boats operating in the Red Sea View towards the starboard side superstructure of a vessel in a shipyard. Sea Story during modification Image courtesy of Ali Aref, President of Dive Pro Liveaboard
MAIB SAFETY BULLETIN 1/2025 This document, containing safety lessons, has been produced for marine safety purposes only, on the basis of information available to date. The Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 provide for the Chief Inspector of Marine Accidents to make recommendations at any time during the course of an investigation if, in his opinion, it is necessary or desirable to do so. The Marine Accident Investigation Branch has been made aware of several incidents and accidents involving Egyptian liveaboard dive boats operating in the Red Sea that have resulted in many fatalities, some of which have been UK nationals. Currently, formal safety investigations into the loss of the vessels involved remains the responsibility of the Egyptian Authority for Maritime Safety. Captain Andrew Moll OBE Chief Inspector of Marine Accidents NOTE This bulletin is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall not be admissible in any judicial proceedings whose purpose, or one of whose purposes, is to apportion liability or blame. This bulletin is also available on our website: www.gov.uk/maib Press Enquiries: 01932 440015 Out of hours: 0300 77 77 878 Public Enquiries: 0300 330 3000
1 BACKGROUND The MAIB is aware that 16 Red Sea liveaboard dive boats have been lost over the last 5 years. Seven of these losses happened in the last 21 months, and three of these resulted in numerous fatalities including UK nationals. In line with the principles of the International Maritime Organization (IMO) Casualty Investigation Code, the UK has been registered as a substantially interested state in the Egyptian safety investigations into these accidents. FINDINGS On 24 April 2023, dive boat Carlton Queen capsized and foundered (Figure 1) near Hurghada, Egypt with 33 people on board. All passengers and crew were rescued though several were injured, including UK nationals. On 11 June 2023, dive boat Hurricane caught fire (Figure 1) and was abandoned near Elphinstone Reef in the Red Sea. Of the 29 people on board, three UK passengers remain unaccounted for and are believed to have perished. On 25 November 2024, dive boat Sea Story capsized and foundered south of Port Ghalib, Egypt with 45 people on board. Four bodies have been recovered and 7 people, including two UK passengers, remain missing and are believed to have perished. SAFETY ISSUES The following safety issues have been identified:
● The dive boats involved were poorly constructed and often substantially modified/extended (Figure 2), which resulted in some vessels exhibiting inadequate stability.
● Essential lifesaving equipment was defective, out-of-date for service and, in some cases, missing.
● The rapid spread of fire is indicative of poor structural fire protection, and items of essential safety equipment, such as fire detection systems and fire extinguishers, were either missing or defective. View across open sea towards the large, capsized boat with tiered decks. Video still across open sea towards the starboard side of a large boat, its tiered aft decks ablaze with orange flames from which thick black clouds of smoke are filling the sky. A dinghy with two people on board is alongside the boat’s bow. Figure 1: Carlton Queen capsized and Hurricane on fire Images courtesy of Toby Meadows/Alexander Derhaag (left) and Mohammed Kaddah (right)
2
● Emergency escape routes were via lockable doors, had no emergency lighting and were unmarked.
● Safety briefings to passengers were of a poor standard or not conducted at all.
● Crews appeared poorly trained and were unfamiliar with their vessels. SAFETY LESSONS Liveaboard dive boat holidays are often marketed using ratings and reviews posted online that are not necessarily accurate and do not assure safety standards. Further, a number of consumers have found themselves switched to another boat on arrival in Egypt, which has negated their attempts to holiday on a safe vessel. From the spate of recent fatal accidents and vessel losses, it is clear that the local safety standards of dive boats operating in the Red Sea can fall well below those routinely experienced in the UK and Europe. Prospective customers are advised only to book liveaboard dive holidays through recognised vendors who can provide assurance about the safety standards applicable to the dive boat. On arrival on board, customers should request that the crew provide a thorough safety briefing before departure. This should cover the emergency warning signal, emergency exits, muster stations, the location and use of safety equipment, and abandon ship procedures. Safety recommendations shall in no case create a presumption of blame or liability Issued February 2025 View across a shipyard towards the port side superstructure of a newbuild vessel still on the blocks and without radars, paintwork and livery. View across water towards the same vessel at anchor while in service, with a modified tiered superstructure at the stern. Images courtesy of Ali Aref, President of Dive Pro Liveaboard Figure 2: Sea Story before and after modification, including extension
FD06082 | 2025_英国_swamping-of-small-commercial-vessel-calypso-2-with-loss-of-2-lives__2025-6-Calypso2-Report.pdf
分类:06_境外及港澳台调查报告 | 年份:2025 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
ACCIDENT REPORT ACCIDENT REPORT Report on the investigation of the double fatality and subsequent loss of the small commercial vessel Calypso 2 near West End, Anguilla on 11 March 2023 VERY SERIOUS MARINE CASUALTY REPORT NO 6/2025 APRIL 2025 Red Ensign Group logo INVESTIGATED BY THE MAIB ON BEHALF OF THE GOVERNOR OF ANGUILLA
This investigation was carried out by the UK Marine Accident Investigation Branch (MAIB) on behalf of the Governor of Anguilla in accordance with the Memorandum of Understanding between the MAIB and the Red Ensign Group Category 2 registry, The Anguilla Maritime Administration. Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of a safety investigation into an accident under these Regulations shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 14(14) of The Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame.
The Marine Accident Investigation Branch was appointed to conduct the investigation reported here in accordance with section 28(2)(a) of the Anguilla Constitution, pursuant to Wrecks Inquiries Act, Revised Statutes of Anguilla, Chapter W35. © Crown copyright, 2025 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. All MAIB publications can be found on our website: www.gov.uk/maib Front cover image courtesy of Anguilla Fire and Rescue Service. For all enquiries: Marine Accident Investigation Branch First Floor, Spring Place 105 Commercial Road Southampton SO15 1GH United Kingdom British Governor’s Office in the Valley Old Ta P.O. Box 60 The Valley 2640 Anguilla Email: maib@dft.gov.uk Telephone: +44 (0)23 8039 5500 Press enquiries during office hours: +44 (0)1932 440015 Press enquiries out of hours: +44 (0)300 7777878
CONTENTS GLOSSARY OF ABBREVIATIONS AND ACRONYMS SYNOPSIS 1 SECTION 1 – FACTUAL INFORMATION 2 1.1 Particulars of Calypso 2 and accident 2 1.2 Investigation 3 1.2.1 Caveat 3 1.3 Background 3 1.4 Narrative 4 1.4.1 The excursion 4 1.4.2 The accident 5 1.4.3 Post-accident events 5 1.4.4 The rescue 6 1.5 Environmental conditions 7 1.5.1 Climate and topography 7 1.5.2 Tidal streams and currents 7 1.5.3 Ground seas 8 1.5.4 Weather warning 8 1.5.5 Local environmental conditions at the time of the accident 8 1.6 Crew and passengers 8 1.6.1 Crew 8 1.6.2 Passengers 9 1.6.3 Postmortem 9 1.7 Calypso Charters Ltd 9 1.7.1 Company 9 1.7.2 Fleet 9 1.7.3 Booking process 9 1.7.4 Safety management and procedures 10 1.7.5 Crew recruitment and assessment 10 1.8 Anguilla maritime regulation 10 1.8.1 General 10 1.8.2 Anguilla Merchant Shipping Act 2010 10 1.8.3 Code of Safety for Small Commercial Vessels Operating in the Caribbean Trading Area 11 1.8.4 Navigational risk assessment 12 1.9 Calypso 2 12 1.9.1 General 12 1.9.2 Safety equipment 14 1.9.3 Calypso 2 inspection history 15 1.9.4 Post-accident examination 15 1.10 Anguilla marine accident response 17 1.10.1 Royal Anguilla Police Force 17 1.10.2 Anguilla Fire and Rescue Service 17 1.10.3 Search and rescue fast response vessel 17 1.11 Emergency response 17 1.11.1 Dutch Caribbean Coast Guard 17 1.11.2 Maritime Rescue Coordination Centre Fort-de-France 18 1.11.3 Automatic identification system 18 1.12 Tourism on Anguilla 18
- 13 Similar accidents
19 1.13.1 Seadogz – heavy contact with a navigation buoy 19 1.13.2 Surprise – grounding and evacuation 19 1.13.3 Unnamed Bayliner Capri – capsize of an open speedboat 19 1.13.4 Last Call – sinking of a motor cruiser 20 1.13.5 Swan – capsize 20 SECTION 2 – ANALYSIS 21 2.1 Aim 21 2.2 Overview 21 2.3 The accident 21 2.3.1 Events leading up to the accident 21 2.3.2 Manoeuvrability 21 2.3.3 Personal flotation devices 22 2.3.4 Use of communication and alert systems 22 2.3.5 Weather conditions 22 2.4 Safety management of small commercial vessels 23 2.4.1 Safety management system 23 2.4.2 Safety management on the day of the accident 23 2.5 Anguilla navigational risk assessment 24 2.6 Emergency preparedness – Anguilla 24 2.7 Emergency response – SAR-1 25 2.7.1 Recovery of people from the water 25 2.7.2 Automated External Defibrillator 25 SECTION 3 – CONCLUSIONS 26 3.1 Safety issues directly contributing to the accident that have been addressed or resulted in recommendations 26 3.2 Safety issues not directly contributing to the accident that have been addressed or resulted in recommendations 26 SECTION 4 – ACTION TAKEN 27 4.1 Actions taken by other organisations 27 SECTION 5 – RECOMMENDATIONS 28
FIGURES Figure 1: Anguilla and (inset) the Leeward Islands Figure 2: Calypso 2 at Rendezvous Bay on 11 March 2023 Figure 3: Passengers' seating positions on the foredeck Figure 4: Accident location, showing positions of the casualties Figure 5: Cliff rescue personnel basket Figure 6: Calypso 2 general arrangement and helm console Figure 7: VHF DSC radio Figure 8: Liferaft stowage in the foredeck seating area Figure 9: Calypso 2 aground in the cove Figure 10: Calypso 2's engines after the accident ANNEXES Annex A: Anguilla Maritime Administration Information Sheet
GLOSSARY OF ABBREVIATIONS AND ACRONYMS
AED
Automated External Defibrillator AFRS
Anguilla Fire and Rescue Service
AIS
automatic identification system AMASR
- Anguilla Maritime Administration and Shipping Registry
CCL
Calypso Charters Ltd cm
centimetre CPR
cardiopulmonary resuscitation DCCG
Dutch Caribbean Coast Guard DSC
digital selective calling EPIRB
Emergency Position Indicating Radio Beacon ft
feet/foot gt
gross tonnage IMO
International Maritime Organization ISM Code
International Safety Management Code for the Safe Operation of Ships and for Pollution Prevention kts
knots m
metres M82-3
Anguilla Small Commercial Vessels Regulations MAIB
Marine Accident Investigation Branch MCA
Maritime and Coastguard Agency MRCC
Maritime Rescue Coordination Centre MSN
Merchant Shipping Notice
PFD
personal flotation device RAPF
Royal Anguilla Police Force SAR
search and rescue SCV Code
The Code of Safety for Small Commercial Vessels Operating in the Caribbean Trading Area, 2021 SMS
safety management system
SOLAS
International Convention for the Safety of Life at Sea, 1974, as amended
STCW
The International Convention on Standards of Training, Certification and Watchkeeping for Seafarers, 1978, as amended UK
United Kingdom US
the United States UTC
universal time coordinated VHF
very high frequency W
watts TIMES: all times used in this report are UTC-4 unless otherwise stated.
Side-on view of Calypso 2’s starboard side while anchored bow-on to the shoreline of a white sandy beach in shallow, turquoise water. Calypso 2
1 SYNOPSIS On 11 March 2023, the small commercial vessel Calypso 2 entered a cove near West End on the north-west coast of Anguilla. The vessel was then overwhelmed by the force of large ground seas1 that had developed near the coast, resulting in its four passengers and two crew being ejected into the water. Tragically, the mate and a female passenger lost their lives. Calypso 2 had been hired for an excursion around the island on 10 March 2023. The trip had been postponed due to adverse weather conditions and was rearranged for the following day. While the weather had improved overnight, high surf and swells remained in areas where there was a steep drop-off from the coast. When Calypso 2 entered the cove it adopted a beam on position to the breaking ground seas. The vessel was swamped and all the people on board were washed overboard. They were eventually recovered by combined land and sea rescue teams. The investigation concluded that: the decision to enter the cove in the prevailing sea conditions was ill conceived and there was no specific plan or consideration of the danger in doing so; the vessel’s operator, Calypso Charters Ltd did not have a safety management system that provided sufficient guidance and instruction to its skippers for the planning and safe execution of excursions; the maritime risks presented by the operation of small commercial vessels in Anguillan waters had been inadequately assessed; and there were omissions in the procedures and equipment available to the search and rescue responders. A recommendation has been made to the Anguilla Maritime Administration and Shipping Registry to work with the Maritime and Coastguard Agency to develop and implement a marine safety management system to ensure that operational risks are adequately assessed and managed. Two further recommendations have been made to the Anguilla Maritime Administration and Shipping Registry to ensure that automatic identification system transponders have been installed as required on board Anguillan vessels, and that the safety management requirements for small commercial vessels are verified during routine inspections. Calypso Charters Ltd has been recommended to develop and implement a safety management system for its domestically operating vessels. Recommendations have also been made to the Anguilla Fire and Rescue Service and the Royal Anguilla Police Force for the provision of additional equipment and the updating of triage procedures to improve the ability of the Anguillan authorities to respond to maritime emergencies. 1 A West Indian name for a swell that occurs in calm weather and without obvious cause, breaking on the shore in heavy roaring waves.
2 SECTION 1 – FACTUAL INFORMATION 1.1 PARTICULARS OF CALYPSO 2 AND ACCIDENT VESSEL PARTICULARS Vessel’s name Calypso 2 Flag Anguilla Classification society Not applicable Official Number 749978 Type Small commercial vessel Registered owner Calypso Charters Ltd Manager(s) Calypso Charters Ltd Construction Glass reinforced plastic Year of build 2011 Length overall 11.06m Gross tonnage 5.72 Minimum safe manning 2 Authorised cargo Not applicable VOYAGE PARTICULARS Departure location Rendezvous Bay, Anguilla Arrival location Rendezvous Bay, Anguilla (Intended) Type of voyage Coastal Cargo information Not applicable Manning 2 MARINE CASUALTY INFORMATION Date and time 11 March 2023 at 1015 (UTC -4) Type of marine casualty or incident Very Serious Marine Casualty Location of incident Anguilla Place on board Overside Injuries/fatalities 2 fatalities, 4 people injured Damage/environmental impact Vessel broke up on impact with the coast Ship operation In passage Voyage segment Mid-water External & coastal environment Fine and clear; south-easterly winds force 3 to 4; slight seas; ground seas near coast Persons on board 6
3 1.2 INVESTIGATION This investigation into a very serious marine casualty was conducted by the Marine Accident Investigation Branch (MAIB) on behalf of the Governor of Anguilla in accordance with the memorandum of understanding between the MAIB and the Red Ensign Group2 Category 2 registry, The Anguilla Maritime Administration. 1.2.1 Caveat The events described in this investigation report are drawn from the evidence collected during the investigation. The recollections of the witnesses varied, and the narrative and facts presented in this report are therefore a best representation of the information gathered. 1.3 BACKGROUND On 5 March 2023, a family of four US nationals comprising two parents and their adult son and daughter arrived at their resort hotel in Anguilla. The family had booked a 1-week stay and had pre-booked a 4-hour vessel excursion around the island on 10 March 2023. Late in the evening of 9 March 2023, the family was informed that the vessel’s operating company, Calypso Charters Ltd (CCL), had cancelled the excursion due to the weather forecast for the following day. The excursion was subsequently rescheduled to 0930 on 11 March 2023, departing from the resort beach at Rendezvous Bay (Figure 1). 2 A group of British Shipping Registers formed of the UK, Crown Dependencies and UK Overseas Territories that operate shipping registers from their jurisdiction. A Category 2 register is able to register commercial ships and pleasure vessels of up to 150 gross tonnage (gt). This limit can be extended to 400gt by a memorandum of understanding with the UK.Map shows the island of Anguilla labelled with key locations, including Rendezvous Bay on the south coast and Crocus Bay on the north coast. An illustrated dashed red line travelling west from Rendezvous Bay through the Anguillita Arch and then north-eastwards past Anguilla Arch and West End to Crocus Bay shows Calypso 2’s planned track. © Made Smart Group BV 2024 © i4 Insight 2024 charts are non type-approved and for illustration purposes only and (inset) Google Maps Calypso 2 planned track Crocus Bay Road Bay Blowing Point Rendezvous Bay Anguillita Channel Sandy Ground Police Station and Marine Base Anguilla Arch West End Figure 1: Anguilla and (inset) the Leeward Islands N Map of two Leeward islands. The island at the top is highlighted with a yellow border and identified as Anguilla. The island at the bottom is labelled Saint Martin. Saint Martin Anguilla
4 1.4 NARRATIVE 1.4.1 The excursion On 11 March 2023, the weather at Rendezvous Bay was fine and clear with rippled seas. By 0930, the small commercial vessel Calypso 2 was anchored stern to the beach (Figure 2) ready for the scheduled excursion. The family arrived at the beach shortly after 0935 and boarded Calypso 2 one at a time, assisted by the vessel’s skipper who boarded after the family members. The skipper showed the family where the lifejackets were stowed before going to the foredeck to raise the anchor and moving to the helming position. At about 0945, the skipper started the engines and manoeuvred Calypso 2 out of Rendezvous Bay in a southerly direction. The family settled in the seating area on the open foredeck, with the two parents sitting on the port side and their son and daughter on the starboard side (Figure 3). The skipper manoeuvred the vessel in a south-westerly direction, intending to follow the coast around the southernmost point of the island then along Anguilla’s northern coast to the popular tourist location of Crocus Bay (see Figure 1). Calypso 2 proceeded south through increasingly choppy seas, during which the skipper left the helm on several occasions to brief the passengers on tourist sights. Sometimes, the mate took control of the vessel until the skipper returned; at other times, the skipper would helm the boat while speaking to the passengers from the doorway to the foredeck. Calypso 2’s route passed through the Anguillita Channel on the island’s western tip and then travelled to the north-west, following Anguilla’s northern coast. There were no other vessels in the area. View from a sandy beach towards the stern of Calypso 2 anchored at the shoreline in rippled turquoise waters. The bow points towards several sailing yachts anchored offshore, some distance beyond which is a coastline. Image courtesy of Rosenberg Figure 2: Calypso 2 at Rendezvous Bay on 11 March 2023
5 1.4.2 The accident At about 1006, Calypso 2 entered the cove adjacent to West End (see Figure 1) where the Anguilla Arch3, a popular tourist attraction, is located. The skipper was standing in the doorway to the foredeck providing a narrative to the passengers, and the vessel’s outboard engines were either in neutral or stopped. Calypso 2 was moving slowly on a southerly heading when its starboard side was struck by a large wave that swamped the vessel, washing the two parents overboard. The water swamping the vessel briefly submerged their son and daughter and the two crew, before a second wave overwhelmed the vessel and ejected everyone overboard and propelled the vessel into the cliffs. No one was wearing a personal flotation device (PFD). 1.4.3 Post-accident events Calypso 2’s passengers and crew became separated once in the water (Figure 4). The father, his son, and the skipper accessed the base of the cliff but the mother, her daughter, and the mate remained in the turbulent surf and ground seas. The daughter, who was a strong swimmer, managed to pull her motionless mother out past the breaking surf to calmer water. The mate was floating face down in the water. Those at the base of the cliff shouted for help. 3 Known locally as The Arch. View from a pontoon towards Calypso 3’s port bow overlaid with illustrated representative positions of the family’s seating positions at the time of the accident.
Person 1 is seated on the port side bench seat, facing across to the starboard side with their back resting against the bulwark and both feet on the deck.
Person 2 is seated along the port side bench seat, facing the left-hand side of person 1 towards the bow. Their back is resting against the helm console, their left leg is stretched in front of them along the seat and their right leg is bent towards their torso.
Person 3 and person 4 are seated next to one another on the port side bench seat, facing the left-hand side of person 1. Figure 3: Passengers' seating positions on the foredeck PORT STARBOARD Photo of Calypso 3 For illustrative purposes only: not to scale
6 1.4.4 The rescue At just after 1015, a tourist at The Arch heard the shouts for help coming from the cove to the north. The tourist saw the skipper and the son at the cliff base. Unable to obtain a mobile phone signal, the tourist left the area to find help. About 10 minutes later, two other tourists staying at a nearby villa also heard the shouting and saw two people in the water. At 1032, the tourists made the first of several emergency calls to the Royal Anguilla Police Force (RAPF) reporting a drowning incident at “West End by The Arch”. After collecting anything buoyant to throw to the people in the water the tourists drove the short distance towards the The Arch, where they met the other tourist. At 1033, the Anguilla Fire and Rescue Service (AFRS) rescue vessel SAR-1 was assigned to the incident and its five crew were paged and immediately responded. At 1045, SAR-1 departed its berth at the Marine Base jetty, Sandy Ground (see Figure 1). At the same time, the first RAPF responders arrived at the cliff top. They heard the shouts for help and met the three tourists, who informed them of the casualties at the cliff base and in the water. The first responders were not carrying any rescue equipment so relayed the actual nature of the emergency to their headquarters. The lead first responder then assisted the father to ascend the cliff. At 1057, SAR-1 arrived on scene. After initially assessing the conditions in the cove and spotting the two people in the water, two crew members jumped into the water to assist the mother and daughter. Both were recovered through the bulwark gate on SAR-1’s starboard quarter. The mother was unconscious and her daughter and SAR-1’s crew began administering cardiopulmonary resuscitation (CPR). Unable to render assistance to the son and the skipper trapped at the cliff base due to the conditions, SAR-1 made its way at speed to the Marine Base jetty where, despite medical attention, the mother was declared deceased. View from the air towards the north coast of Anguilla with the rock formation of The Arch between two bays. The bay on the left-hand side is labelled with the positions of the casualties after being ejected from Calypso 2. The mother and daughter are in the water to the left of the arch on the right-hand side of the entrance into the bay. The father is at the foot of the cliff inside the left-hand side of the bay. The skipper and son are at the foot of the cliff in the centre of the bay. The mate is at the foot of the cliff inside the right-hand side of the bay. Figure 4: Accident location, showing positions of the casualties The Arch Father Mother and daughter Skipper and son Mate
7 Meanwhile, a large crowd of local residents had been alerted to the cliff top through social media and word of mouth and began to effect a rescue with the first responders. After an unsuccessful attempt using an electrical cord, the rescuers used a rope attached to a boat fender to pull the son and the skipper up the cliff one at a time. Once at the top, Calypso 2’s skipper confirmed there had been six people on board and the rescuers began to search for the mate. The skipper and the father and son were transferred to hospital to be treated for minor injuries. Shortly afterwards, an AFRS fire appliance arrived on scene and its crew descended the cliff. They found the mate at the cliff base and recovered her to the cliff top in a personnel basket (Figure 5) using a locally sourced mobile crane. The mate was subsequently declared deceased at the scene. 1.5 ENVIRONMENTAL CONDITIONS 1.5.1 Climate and topography Anguilla is approximately 16 miles long and 3 miles wide at its widest point with predominantly flat terrain. The island’s coastline is a combination of beaches and cliffs and there are many bays (see Figure 1). Anguilla’s northern coast has extensive reefs with flat sandbanks and seagrass beds. The accident location comprised limestone and coral cliffs that had formed a cove with inlets. There were numerous large rocks and boulders at the cove, which had a sandy beach with a steep drop-off into deeper water. A hydrographic survey of the area was undertaken in early 2017. The data from the survey was supplied to the UK Hydrographic Office and subsequently used to compile British Admiralty Chart 2047 – Approaches to Anguilla. The chart showed a depth of 0.7m to the south-west of the accident location. A rock symbol on the chart denoted the nature of the seabed. 1.5.2 Tidal streams and currents The prevailing current around Anguilla sets from the west or north-west at a rate of about 1 knot, increasing to a maximum of 1.5 knots (kts) during the summer. The current could be influenced by west and south-westerly winds, though the island was generally sheltered from the south equatorial current by the banks surrounding it. Anguilla’s tidal range was about 0.3m with flood tidal streams setting to the west. The tidal height at West End was about 0.4m at the time of the accident. View from a cliff down to the top of a metal cage as it is hoisted up from the sea. There are two people standing inside the cage with rescue equipment. In the background the partially submerged small commercial vessel Calypso 2 is lying on rocks, positioned port side to the cliff face and listing to starboard. Debris from the vessel is floating in the water beneath the cage. Figure 5: Cliff rescue personnel basket Image courtesy of Anguilla Fire and Rescue Service
8 1.5.3 Ground seas Ground swells, known locally as ground seas, are generated by storms in the North Atlantic Ocean. Predominant from mid-October through to the end of March, ground seas were also known to occur in April. Imray Chart A244 provided pilotage notes for the islands of Anguilla, Saint Martin, and Saint Barthélemy. The note on ground swells stated that: …on any beach open to the northwest as far south as Antigua, there is the danger of ground swell, especially if the beach ashore is quite steep and the sand really soft. [sic] Ground swells are completely independent of the Caribbean weather systems; they are generated by storms in the North Atlantic. 1.5.4 Weather warning At 1630 on Wednesday 8 March 2023, Antigua and Barbuda Meteorological Services issued an urgent marine weather message that included warnings of:
● High surf from late Thursday (9 March) for Anguilla, Barbuda and Antigua, and the British Virgin Islands, with dangerous battering surfs of over 3m affecting some coasts.
● Moderate and long period swells that were expected to impact the northern coastline.
● A high risk to life, livelihood, property, and infrastructure.
● Swells that were expected to cause life-threatening surf and rip currents.
● Significant wave heights of 2m to 3m with swell periods of between 10 seconds and 15 seconds. Precautionary actions urged all to stay away from rocky and coastal structures along affected coastlines. The warning was valid until Sunday, 12 March 2023. 1.5.5 Local environmental conditions at the time of the accident It was a clear, sunny day with little cloud and slight seas. The winds were reported as south-easterly between 7kts and 14kts. There were ground seas on the northern coastline of Anguilla. 1.6 CREW AND PASSENGERS 1.6.1 Crew The skipper was a dual Anguilla/US national who had joined CCL in 2015 as mate and was promoted to skipper in 2018. The skipper held an Anguilla Boatmaster Grade 1 License that was issued in October 2022, and had completed ship security 4 Imray nautical charts were based on official hydrographic office data but edited and augmented with additional information aimed at the small vessel user. Chart A24 had an Imray stock code of ICA24-3.
9 officer, GMDSS5 short range radio, sea survival and firefighting training. The skipper was confident in their ability to skipper small commercial vessels and had developed the practice of speaking to passengers from the doorway of the canopy while underway. At such times, the skipper would either hand the helm over to the mate or continue to steer from a position at the doorway. The skipper was able to swim. The mate, Shanika Thomas, was a St. Vincent national who had joined CCL in
- She was employed as a hostess on board Miss Ginger, the largest vessel
in the CCL fleet, but also acted as mate on the smaller vessels. In 2019, Shanika had completed all of the basic safety training required by STCW6 in anticipation of a career on large internationally trading passenger ships. She did not hold a boat handling qualification or radio licence but had reportedly helmed Calypso 2 before. It was reported that Shanika was able to swim. 1.6.2 Passengers Robin Rosenberg, her husband, and adult son and daughter were described as good to strong swimmers who were in good physical health on the day of the accident. 1.6.3 Postmortem Postmortem examinations of Robin Rosenberg and Shanika Thomas conducted in Anguilla recorded their cause of death as drowning. 1.7 CALYPSO CHARTERS LTD 1.7.1 Company Founded in 2010, CCL was a family business based in Blowing Point, Anguilla. The office was managed by the owner, who was also the chief executive officer, asset manager and general manager. 1.7.2 Fleet At the time of the accident, the CCL fleet comprised 14 passenger vessels that included 38ft charter vessels, a 40ft Sunseeker, a sports fishing vessel and a 65ft catamaran. The vessels were used for excursions around Anguilla and the neighbouring islands as well as to provide an international transfer service from St. Maarten. 1.7.3 Booking process Excursions were booked either with CCL directly or through a third party such as a hotel concierge or travel agent. On receipt of a booking request detailing the number of guests and type of excursion required, CCL’s asset manager would assign a vessel and crew before the booking was confirmed. The day before a booked excursion the assigned skipper was advised how many and what type of trips the vessel would be conducting, together with details of embarkation/disembarkation points, the number of guests, and any special requests. 5 Global Maritime Distress and Safety System. 6 The International Convention on Standards of Training, Certification and Watchkeeping for Seafarers, 1978, as amended.
10 1.7.4 Safety management and procedures CCL’s safety management system (SMS) had been assessed in 2022 for the operation of its internationally trading vessels, but there was no evidence of an equivalent system covering its domestically trading vessels. During the investigation, five generic procedural documents dated 13 March 2023 were submitted. There was no indication that these documents existed before the accident. The procedures provided addressed pre-departure and departure protocols, conduct of private and shared excursions, disembarkation processes, and emergency preparedness. CCL did not define the maximum weather conditions in which its vessels could operate nor did it require any assessment of operational risks or passage planning. 1.7.5 Crew recruitment and assessment New crew members were assessed by more experienced CCL crew. There was no formal induction procedure, and no records of the training completed by new joiners. After an introductory period, a new crew member would be allocated to a specific CCL vessel. It was common practice for the crew to circulate around the fleet, often with a change of roles. There was no formal procedure for assessing crew competence. 1.8 ANGUILLA MARITIME REGULATION 1.8.1 General The Anguilla Maritime Administration and Shipping Registry (AMASR) was responsible for navigational management within Anguilla’s coastal waters. The department consisted of the permanent secretary of infrastructure, communication, utilities, housing and information and technology, the superintendent of ports, and the registrar of ships. The UK’s Maritime and Coastguard Agency (MCA) provided support, funding, training and advice to AMASR through a series of audits and reviews. There were two AMASR authorised surveyors, both of whom had completed MCA surveyor training. 1.8.2 Anguilla Merchant Shipping Act 2010 The Anguilla Merchant Shipping Act 2010 enacted the Anguilla Small Commercial Vessels Regulations (M82-3). These regulations detailed the requirements for the inspection of small commercial vessels operating in Anguilla. Every vessel was required to be inspected, and a certificate of inspection issued that remained valid for a period not exceeding 3 years. Additionally, a vessel was required to undergo an annual inspection of the same scope as the initial one, but in less detail. M82-3 required that vessels comply with the Code of Safety for Small Commercial Vessels Operating in the Caribbean Trading Area published by the International Maritime Organization (IMO) in September 2021 (SCV Code 2021).
11 AMASR produced an information sheet (Annex A) that set out its requirements for safety equipment and documentation required to be carried on small commercial vessels carrying less than 12 passengers. Included in the list of equipment was a Class B automatic identification system (AIS) transponder. Implementation of this requirement was reported to be slow. M82-3 specified that a vessel must have someone in command who held an appropriate licence issued by AMASR and manned in line with the certificate of inspection held. The AMASR information sheet and vessel’s certificate of inspection set out the qualification requirements for the crew. 1.8.3 Code of Safety for Small Commercial Vessels Operating in the Caribbean Trading Area The SCV Code came into effect on 1 August 2021 and provided operating standards for safety, seafarer certification and wellbeing, and the protection of the marine environment for small vessels operating in the Caribbean Trading Area7. The SCV Code was initially based on the US Code of Federal Regulations Title 46 and the MCA code of practice titled Safety of Small Workboats and Pilot Boats. The SCV Code stated that, before getting underway, the master should inform passengers of:
● emergency procedures;
● location of emergency exits;
● location of stowed lifejackets;
● proper manner for donning lifejackets;
● placard location for emergency equipment; and
● requirement for all passengers to wear lifejackets when possible hazardous conditions exist, as directed by the master. The crews of small commercial vessels operating in coastal waters were required to undertake emergency drills and maintain a record of them. The SCV Code stated that, where a passenger vessel8 was engaged on an international voyage, it needed to comply with the requirements of the International Safety Management Code for the Safe Operation of Ships and for Pollution Prevention (ISM Code). The SCV Code required any vessel making a voyage in exposed or coastal waters to keep an accurate record of everyone embarking the vessel, including their name and gender and distinguishing between adults, children and infants. 7 Defined as the Gulf of Mexico and Caribbean Sea proper, including the bays and seas therein and that portion of the Atlantic Ocean within the boundary constituted by a curved line from a point on the east coast of the US in latitude 32° 00’ north to the intersection 20° 00’ north, 59° 00’ west; from there, a curved line to the intersection of 7° 20’ north, 50° west; from there, a curved line drawn south-westerly to the eastern boundary of French Guiana. 8 A passenger vessel in the SCV Code is one that carries more than 12 passengers.
12 Vessels on coastal voyages around Anguilla were not required to comply with the requirements of the ISM Code, although the SCV Code stated that vessels must be operated safely in such a manner as to afford adequate precaution against hazards, which might endanger the vessel, its passengers and cargo. Chapter VIII section 4.10 further required that a safety management system should be in place with related documentation commensurate with the vessel type, size and operation. Annex 17 to the SCV Code provided an example of the suggested content of a safety management system. 1.8.4 Navigational risk assessment In April 2021, AMASR completed a Maritime Risk Assessment for the Coastal Waters up to the Economic Fishing Zone. In August 2022, AMASR commissioned a marine consultancy to conduct a navigational risk assessment of Anguillan waters. The report of the assessment’s findings, delivered in July 2023, highlighted that there had been six personal injuries, five missing persons and three fatalities recorded involving recreational and small commercial craft in the period between 2019 and 2023. The report stated that, incidents involving crew and passengers onboard recreational vessels and small commercial vessels are considered a comparatively ‘high risk’. [sic] The report’s conclusions included that:
● a maritime safety management system was required to reduce risk;
● several reported incidents involving recreational and charter vessels had resulted in serious injuries and loss of life; and
● a risk register was required to identify hazards and risk controls. The report noted the limited AIS data available from small commercial vessels operating in Anguillan waters. 1.9 CALYPSO 2 1.9.1 General Calypso 2 was built for CCL in Trinidad in 2011 by an unknown manufacturer. The vessel had a planing hull constructed from glass reinforced plastic and twin 350 horsepower outboard engines that had been fitted in December 2022. There were passenger seating areas around the foredeck and across the stern. Approximately one third of the vessel’s length from the bow there was a partially enclosed cabin area that included the helm controls on the starboard side, the on board toilet, and a seating area on the port side (Figure 6). The stern had a low transom to facilitate boarding from the water. The helm was equipped with engine throttles; engine start-stop buttons; a global positioning system chart plotter; a compass; a bilge pump control; and a very high frequency (VHF) digital selective calling (DSC) radio with an alert button (Figure 7). Calypso 2 also carried a copy of the Imray A24 paper chart.
13 View across to the starboard side of Calypso 3’s helm console shows the steering wheel and dashboard controls on the left-hand side. Beyond these and lower down near the deck is the EPIRB, which is mounted in the corner beneath the VHF DSC radio handset. View from behind the starboard helm console of Calypso 3 shows the wheel on the left-hand side in front of the dashboard, the integrated chart plotter display screen at the centre of the dashboard and the integrated VHF DSC radio display on the right-hand side of the dashboard. A small radio handset on a coiled cable is plugged in to the VHF DSC display and sits in a cradle mounted beneath the console’s starboard side window. Aft of the handset is a single top-mounted throttle lever. Figure 6: Calypso 2 general arrangement and helm console For illustrative purposes only: not to scale EPIRB VHF DSC radio Seats Seats Seats Liferaft Chart plotter Engine throttles Helm Engines Helm console Photo of Calypso 3 Photo of Calypso 3 Close-up view of Calypso 3’s VHF DSC radio display screen and the control buttons and dials that surround it. Bottom left, between the lower right-hand side of the speaker and the lower left-hand side of the digital display screen, a red plastic sliding cover with ‘DISTRESS PULL OPEN’ printed in white letters above a downward pointing arrow is identified with a label as the DSC alert button. Figure 7: VHF DSC radio DSC alert button Photo of Calypso 3
14 1.9.2 Safety equipment Calypso 2 was equipped with 14 solid foam adult lifejackets suitable for persons weighing over 43kg and two child lifejackets. These were stowed under the seats in the bow. There was one 16-person liferaft in a hard case container stored under the foredeck seating area (Figure 8). The vessel carried: a pack of pyrotechnic flares, comprising two orange smoke floats, six red parachute flares and six handheld flares; two lifebuoys, one with a light and one with a line; and two fire extinguishers. An Emergency Position Indicating Radio Beacon (EPIRB) arranged for manual release and activation was stowed below the helm console (see Figure 6). Calypso 2 was not equipped with an AIS transponder. View down to the white plastic casing of a liferaft stowed in a rectangular space beneath the foredeck seating area on Calypso 3. A rope handle is tied around the liferaft, ready to lift it out. Figure 8: Liferaft stowage in the foredeck seating area Photo of Calypso 3
15 1.9.3 Calypso 2 inspection history An inspection of Calypso 2 out of the water was carried out on 19 July 2022, recorded on the report of inspection as being a survey. Five deficiencies were raised by the surveyor, which included loose fittings and minor hull damage. A subsequent inspection of Calypso 2 while afloat was completed by the same surveyor on 16 August 2022. Eight deficiencies were recorded, including that drills were neither frequent nor logged; the primary VHF radio was inoperative; and charts for the area of operation required updating. There was no observation or deficiency noting that Calypso 2 was not equipped with a Class B AIS transponder. No deficiencies related to safety management were raised in either assessment by the surveyor. The deficiencies raised during the inspection were closed out as completed on 17 October 2022. A new certificate of inspection for a small passenger ship, in line with the requirements of M82-3, was issued on 25 October 2022. The expiry date for this certificate was 19 July 2023. 1.9.4 Post-accident examination Calypso 2 eventually broke up on the rocks in the cove (Figure 9), visible from the cliff tops above the accident site. It was not possible to recover much of the wreckage due to its location, the nature of the seabed, and the predominant swell. Despite the terrain, the RAPF recovered Calypso 2’s twin outboard engines. MAIB inspectors conducted a visual examination of the engines and noted that:
● Both engines showed damage from immersion in seawater.
● The port engine had lost its lower leg unit, including the gearbox and propeller.
● The starboard engine was almost complete and the propeller was still in place, though the blades were bent. The engines were later sent to an engine specialist for technical examination, the findings of which concluded that:
● The port engine (left-hand rotation) had no useable electronic data that could be obtained from the unit (Figure 10a).
● The starboard engine (right-hand rotation) showed evidence that the engine was in neutral or stopped when it came into contact with the ground.
● There was no brush damage on the propeller blades and no evidence of torque stress damage to the propeller drive splines. The drive pin was intact and the propeller hub was still theoretically useable (Figure 10b).
● There was no evidence to indicate that either engine had hydraulically locked9. 9 Occurs when an engine is stopped by water entering the cylinder while running. The incompressibility of the water causes the engine to stop instantly.
16Stern to bow view from above of the partially submerged small commercial vessel Calypso 2 lying on rocks between the foot of a cliff and breaking waves. The vessel is port side to the cliff face and listing to starboard. Astern of the vessel’s starboard quarter various items of debris have been washed onto or are floating in the water between the rocks. Figure 9: Calypso 2 aground in the cove Image courtesy of Anguilla Fire and Rescue Service Figure 10: Calypso 2's engines after the accident Calypso 2’s recovered port outboard engine powerhead rests on dry land without its housing. Calypso 2’s recovered starboard outboard engine rests on dry land without its housing. The engine’s midsection and lower unit are still intact. Port engine (left-hand rotation) Starboard engine (right-hand rotation) a b
17 1.10 ANGUILLA MARINE ACCIDENT RESPONSE 1.10.1 Royal Anguilla Police Force The RAPF had around 95 officers and support staff and was responsible for emergency response on the island, including triaging emergency calls and escalating marine responses to the AFRS as necessary. There had previously been a RAPF marine branch that undertook sea patrols of Anguilla’s coastal waters, but the patrol vessel had been badly damaged in a storm and was not replaced. 1.10.2 Anguilla Fire and Rescue Service The AFRS was based at Anguilla’s airport and managed the maritime search and rescue (SAR) unit and the marine response centre. Several of the firefighters were trained in cliff rescue and the required descent equipment was available on board the firefighting vehicles. The marine response centre was manned by ARFS staff who coordinated the response to a notified marine incident. The centre was equipped with local charts, an incident control board showing vessel details and search areas, SAR manuals and a VHF DSC radio. 1.10.3 Search and rescue fast response vessel A purpose-built SAR fast response vessel, SAR-1, was used by the AFRS to respond to maritime incidents. Located at Sandy Ground in Road Bay (see Figure 1), the expected response time for SAR-1 to mobilise to an incident was 15 minutes. SAR-1 was equipped with a VHF DSC radio, AIS transponder, first aid kit, charts and lifejackets. The vessel usually carried an Automated External Defibrillator (AED), which was not on board on the day of the accident due to the awaited supply of replacement defibrillator pads. On the starboard side of SAR-1 there was a bulwark door with a lower edge that was 60cm above the waterline. The vessel was not equipped with the means of recovering an unconscious person or someone who was unable to assist in their own recovery from the water. Nominated AFRS crew were tasked as crew and had completed STCW safety courses and the UK Royal Yachting Association Level 2 Powerboat Handling training, which was supplemented by MCA workshops. SAR-1 was usually manned by two coxswains and three crew. The designated coxswains each held an Anguilla Boatmaster Grade 1 License. No formal training on the recovery of personnel in the water had been completed. 1.11 EMERGENCY RESPONSE 1.11.1 Dutch Caribbean Coast Guard The Dutch Caribbean Coast Guard (DCCG) was the coastguard for the territorial waters of the Caribbean countries of the Kingdom of The Netherlands – Aruba, Curaçao and St. Maarten – and the adjacent Caribbean Sea. The DCCG had numerous air and sea assets at its disposal to respond to incidents. There was a memorandum of understanding between DCCG and AMASR for assistance when required.
18 1.11.2 Maritime Rescue Coordination Centre Fort-de-France The nearest Maritime Rescue Coordination Centre (MRCC) to Anguilla was located in Fort-de-France on the island of Martinique. MRCC Fort-de-France was the regional centre responsible for the coordination of search and rescue incidents in the northern region of the Lesser Antilles, in which Anguilla is located. Response to EPIRB notifications within Anguilla waters was coordinated by MRCC Fort-de-France. 1.11.3 Automatic identification system The AIS is a short-range tracking system developed as an identification and positional information system for ships. The information it provides is used by both marine traffic and shore stations. Carriage of AIS is mandatory on all SOLAS vessels10, but the system is only required on non-SOLAS vessels if stipulated by the local marine administration. A SOLAS vessel is required to carry a Class A AIS transponder that transmits at 12.5 watts (W). Dynamic information, including position, course and speed, is transmitted every 2 to 10 seconds while a vessel is underway, or every 3 minutes when at anchor. Information including the vessel’s name and cargo being carried is transmitted at 6-minute intervals. In contrast, Class B AIS transponders transmit at 2W. Static data is also transmitted at 6-minute intervals, though dynamic data is transmitted every 30 to 180 seconds. Whereas Class A transponders can receive and transmit voyage and safety-related messages, Class B transponders can only receive such data. There were a series of coastal radio stations on Anguilla, Saint Martin and Martinique that maintained a listening watch on VHF radio. The AFRS marine response centre had access to a web-based AIS monitoring resource during incidents. 1.12 TOURISM ON ANGUILLA With 33 beaches and clear Caribbean waters, the popular tourist destination of Anguilla had attracted over 51,000 visitors during the period from January to March 2023. In 2023, there were about 300 vessels registered in Anguilla, many of which were solely engaged in coastal day excursions inside Anguillan coastal waters. Additionally, there were several small charter vessels similar to Calypso 2 that provided international shuttle or chartered services between Anguilla and Saint Martin. 10 The International Convention for the Safety of Life at Sea (SOLAS), 1974, as amended, required the carriage of AIS on cargo vessels over 500 gross tonnage and all passenger vessels on international voyages.
19 1.13 SIMILAR ACCIDENTS 1.13.1 Seadogz – heavy contact with a navigation buoy On 22 August 2020, a 15-year-old passenger on the 9.7m rigid inflatable boat Seadogz died when the craft struck a navigational buoy at high speed in Southampton Water, England (MAIB report 10/202311). The investigation found that:
● There was no monitoring of small commercial craft operation.
● The SMS and risk assessments did not include all the hazards presented during the vessel’s operation. 1.13.2 Surprise – grounding and evacuation On 15 May 2016, the passenger vessel Surprise grounded on rocks during a sightseeing tour around the Isles of Scilly, England (MAIB report 14/201712). All 48 passengers were safely transferred to other vessels, and the passenger vessel returned to harbour under its own power despite being damaged below the waterline. The investigation concluded that:
● A passage plan had not been prepared for the excursion.
● The vessel’s SMS lacked guidance on the conduct of navigation and what actions to take in an emergency.
● Procedures for issuing local authority boatmen licences lacked rigour; there was no syllabus for candidates to follow; or assurance of training standards. 1.13.3 Unnamed Bayliner Capri – capsize of an open speedboat On 10 March 2014, three men departed Great Yarmouth, England in a 5.7m Bayliner Capri 2000 speedboat to go fishing. About 3.5 hours later, the capsized hull was seen about 100m offshore. The three men lost their lives in the accident (MAIB report 28/201413). The investigation established that:
● The men were insufficiently experienced and were probably not expecting the deteriorating weather conditions, despite the change having been forecast.
● The vessel had a low freeboard at its stern, making it vulnerable to swamping when its propeller became fouled. 11 https://www.gov.uk/maib-reports/heavy-contact-between-the-high-speed-passenger-craft-seadogz-and-a- navigation-buoy-with-loss-of-1-life 12 https://www.gov.uk/maib-reports/grounding-and-evacuation-of-domestic-passenger-vessel-surprise 13 https://www.gov.uk/maib-reports/capsize-of-an-open-speedboat-being-used-to-recover-longline-fishing- gear-off-lowestoft-england-with-loss-of-3-lives
20 1.13.4 Last Call – sinking of a motor cruiser On 27 November 2007, the skipper and two crew from the vessel Last Call were lost after heading out to sea from Whitby, England in inclement sea conditions. The vessel was swamped by the high surf shortly after clearing the harbour and all three people on board were ejected overboard (MAIB report 11/200814). The investigation concluded that:
● The skipper and crew’s lack of training and qualification in the use and operation of small craft contributed significantly to the accident.
● The vessel was overwhelmed by the force of the large seas that had developed. 1.13.5 Swan – capsize On 14 October 2004, the passenger launch Swan flooded and capsized on the River Avon, England with a skipper and nine passengers on board. The skipper had manoeuvred the vessel too close to a weir to produce a ‘unique thrill’. The vessel floundered, capsized, and tipped those on board into the water. About 20 minutes later, all were rescued and treated for minor injuries (MAIB report 11/200515). The investigation found that no effective risk assessment had been carried out for the vessel’s operation. 14 https://www.gov.uk/maib-reports/sinking-of-motor-cruiser-last-call-in-heavy-weather-at-whitby-england-with- loss-of-3-lives 15 https://www.gov.uk/maib-reports/flooding-and-capsize-of-passenger-launch-swan-under-pulteney-weir-on- river-avon-bath-england
21 SECTION 2 – ANALYSIS 2.1 AIM The purpose of the analysis is to determine the contributory causes and circumstances of the accident as a basis for making recommendations to prevent similar accidents occurring in the future. 2.2 OVERVIEW The accident happened because Calypso 2 was too close to shore, and was swamped and propelled into the rocks and cliffs by a large wave before it could be manoeuvred away. Robin Rosenberg and Shanika Thomas were not wearing PFDs and drowned after they were ejected into the water. The circumstances of the accident and the reasons why two people lost their lives are analysed in this section of the report. The factors that contributed to this fatal accident will also be discussed, including the conduct of the excursion and the emergency preparedness. 2.3 THE ACCIDENT 2.3.1 Events leading up to the accident Calypso 2’s skipper had been entertaining the family group by providing a narrative of the sights and notable buildings during the trip. Although it is unclear exactly why the skipper chose to enter the cove near West End and leave the helm when the vessel was near the cliffs, shallows, and rocks, it is possible that they had intended to show the family The Arch. It is highly likely that once inside the cove the skipper became distracted by their narrative to the family and did not realise how close Calypso 2 was to the shore. In the prevailing circumstances and conditions, and against the weather warning’s advice, to approach the cove at all was a serious misjudgement. Once Calypso 2 was in the cove it was at high risk of being carried inshore by the surf and ground seas. Calypso 2 was swamped after entering the cove when it took up a beam on position to the ground seas rolling into the shore, and its skipper was unable to take avoiding action in sufficient time. Similar to the prevailing conditions at the time of the accidents involving Surprise, the unnamed Bayliner Capri, and Last Call, those experienced by Calypso 2 were to be avoided for the safety of craft, people and the environment. Without a formal assessment of the excursion, the opportunity to examine the hazards and risks of entering the cove was lost. 2.3.2 Manoeuvrability It is unclear why Calypso 2 was not manoeuvred out of the cove before the first wave struck. The vessel was equipped with relatively new engines that made it highly manoeuvrable and provided sufficient ability for it to leave the area; however, that there was no apparent attempt to do so possibly indicates that the helm was not manned at the time. The second wave followed in quick succession to the first
22 and it is unlikely there was time to react before everyone was ejected. There was nothing that could be done to resolve the situation once the occupants had been ejected overboard. The post-accident examination of the engines indicated that they were not operated at high power just before they became damaged. This also suggests that the helm was either unmanned or, if someone was at the helm, they did not take effective action in sufficient time to avoid being swamped. 2.3.3 Personal flotation devices None of the passengers or crew were wearing PFDs at the time of the accident. This was not unusual for recreational excursions in the Caribbean region, where PFDs were considered restrictive. Nevertheless, an adequate assessment of the prevailing sea conditions might have identified that the donning of PFDs was a prudent control measure in the circumstances. While lifejackets were available on board, they were of a heavy foam type intended to be donned in an emergency during a controlled abandonment of the vessel. These lifejackets might have been too cumbersome to wear for long periods of time on a vessel the size of Calypso 2. Consequently, Robin’s and Shanika’s chances of survival were substantially reduced when they lost consciousness in the water without any additional buoyancy to support them and maintain their airways clear of the water. 2.3.4 Use of communication and alert systems Calypso 2 was equipped with an EPIRB that needed to be removed from its bracket under the helm and then manually activated, while the VHF DSC alert button was located on the helm console. Neither the EPIRB nor VHF DSC were activated in the emergency response phase to this accident. Although the two waves struck in quick succession, the skipper or mate would have been afforded more protection than others on board due to the semi-enclosed nature of the helm area and the availability of handholds. Given that the two devices were within reach of the helm position, that the crew did not use either system possibly indicates that neither was near the helm position or they were insufficiently familiar with their use. Calypso 2’s EPIRB has neither been recovered nor emitted an alert since the accident, calling into question the suitability and stowage position of such EPIRBs for a vessel operating in challenging seas. 2.3.5 Weather conditions The weather in Anguilla follows a defined pattern and the weather experienced on the day of the accident was as forecast and had been widely promulgated via marine weather warnings. The sharp incline to the water from the beach where the accident occurred was a common feature along Anguilla’s northern coast. Imray Chart A24 and British Admiralty Chart 2047 provided sufficient information on ground seas for the danger to be adequately assessed by anyone with a basic understanding of the area. Additionally, a surf warning was in place that provided a fair indication that mariners could expect adverse conditions at such locations until Sunday, 12 March 2023.
23 There is no evidence that either CCL or Calypso 2’s skipper had considered the risk of ground seas in the prevailing conditions following the previous day’s bad weather. Although such phenomena were common in the winter months, CCL did not provide guidance to its skippers on the precautions to be followed during inclement sea conditions. Consequently, the hazards involved with operating a vessel in such conditions were not identified or mitigated and skippers were instead left to make their own assessment. 2.4 SAFETY MANAGEMENT OF SMALL COMMERCIAL VESSELS 2.4.1 Safety management system The SCV Code required passenger vessels operating internationally to operate under the requirements contained in the ISM Code. Though evidence was available to show that an SMS for the operation of the internationally trading vessels in the CCL fleet carrying more than 12 passengers had been audited in March 2022, there was no evidence that an equivalent system had been implemented on Calypso 2. Given the requirement in the SCV Code for an SMS commensurate with the vessel’s type, size and operation, it is almost certain that a critical assessment of the system in use at CCL carried out during inspections of the vessel would have deemed it to be noncompliant with the code requirements. The absence of company guidance or procedures, coupled with a lack of regulatory oversight, meant that the skipper of Calypso 2 had complete autonomy over how it was operated. Consequently, Calypso 2’s safety on the day of the accident relied on the skipper’s decision-making and competence rather than a robust SMS meeting a defined standard. 2.4.2 Safety management on the day of the accident The absence of CCL procedures or guidance left Calypso 2 without a framework for its operation. Consequently, and contrary to the SCV Code, there was no company requirement for either a pre-excursion briefing between the skipper and the mate; a format for the passenger safety briefing; or for a copy of the passage plan to be retained ashore; this meant that the vessel’s progress could not be checked or monitored. There were no systems in place to support the skipper in making the initial decision to undertake the excursion or, should the excursion go ahead, a safe route to follow. The decision to navigate Calypso 2 into an area with charted shallows, known to experience ground seas and subject to a weather warning had similarities to the resultant safety issues from the investigation into the foundering of Swan and the accident involving Seadogz, where no effective assessment of the risk of a planned excursion were carried out. Calypso 2’s skipper was experienced and qualified for their role. However, while M82-3 required that they were suitably qualified to helm the vessel, and to use the communication/distress systems on board, there was no requirement for the mate to be similarly capable. Without guidance to the contrary, the skipper likely felt at liberty to place the mate at the helm.
24 2.5 ANGUILLA NAVIGATIONAL RISK ASSESSMENT The navigation risk assessment for the internal waters of Anguilla commissioned by AMASR noted the paucity of AIS data for small commercial vessels. The assessment recommended implementing a maritime SMS that included a register of maritime risks. Ongoing monitoring of these risks in Anguilla would rely on periodic risk reviews. The identification of the comparatively high risks associated with small commercial vessels and the low adoption of AIS on these vessels pose challenges to identifying the population at risk and making an accurate assessment of risk in the sector. There was no existing policy on how Anguillan authorities should use AIS data. The navigational risk assessment highlighted the poor AIS data from small commercial vessels, emphasising the need for better compliance by commercial vessels carrying fewer than 12 passengers. This would support the periodic reviews recommended in the assessment. 2.6 EMERGENCY PREPAREDNESS – ANGUILLA The shore-based response to the accident was triggered by the emergency calls to the RAPF made by tourists reporting a drowning incident at The Arch. Despite several subsequent emergency calls being made, the lack of a complete understanding of the unfolding emergency made the organisation of an appropriate response difficult. That a vessel was involved only became apparent when the first RAPF responder arrived at the scene, though this did not delay the maritime response to the accident. Rapid and effective triage of an incident is vital to deliver an effective response to the casualties and to assess the risks to responders and the public during the rescue phase. Although neither the DSC nor EPIRB systems were activated to indicate that Calypso 2 was in distress, the agreements with DCCG and MRCC Fort-de-France provided Anguilla with experienced and well-equipped SAR services had they been required. The marine response centre at the airport was equipped with a VHF DSC system in order to receive distress messages but it is unlikely that the activation of the EPIRB or DSC on Calypso 2 would have resulted in a quicker shore-based response to this accident due to the delay that a relay response inevitably introduces. The mandate from AMASR was that small commercial vessels carrying fewer than 12 passengers must be equipped with a Class B AIS transponder. Although this was not a factor in the accident, the absence of AIS on Calypso 2 meant that initial responders lacked a key indicator that a vessel might be involved and information on how many people were at risk. Even if Calypso 2 had such equipment, the marine response centre not being equipped with an AIS unit limited the information available to the AFRS staff stationed there. Despite the risks presented by using a rope connected to a boat fender to pull the son and skipper up the cliff, the rescue effected by the first responders and local residents was successful. The subsequent descent of the cliff by trained AFRS staff using appropriate equipment and the use of a mobile crane for the recovery of the mate allowed this phase of the response to be completed with minimal risk.
25 Despite the slightly protracted shore-based rescue phase, all those ejected from Calypso 2 were recovered by the activities of the organisations involved in the response. On the causes of death it is likely that, once ejected overboard, the tragic loss of Robin and Shanika could only have been averted had they been wearing PFDs and had they received immediate medical attention on recovery. 2.7 EMERGENCY RESPONSE – SAR-1 2.7.1 Recovery of people from the water The AFRS search and rescue craft SAR-1 was purpose-built for emergency use around Anguilla’s coastal waters. The vessel was sufficiently manned by qualified crew on the day of the accident. Despite SAR-1 being specifically intended for deployment to waterborne incidents, no equipment was provided to facilitate the recovery of people from the water. The primary means for recovering a person from the water was to manually lift them through the bulwark door on the starboard side of the vessel. SAR-1 was alerted to a person drowning at “West End by the Arch”. Responding to the reported drowning incident, the rescue craft mobilised in a timely manner. When SAR-1 reached the scene of the accident, it was restricted in its ability to reach the casualties at the cliff base due to the turbulent seas and the proximity of shoals and rocks. The two casualties in the water were accessible to the boat, but Robin was unconscious and her daughter was extremely tired when the boat arrived. With no means of recovery fitted to the boat, the only way the crew could lift the casualties from the water was to enter the water themselves. The crew of SAR-1 would not have needed to enter the water had the rescue craft been fitted with equipment that facilitated the rescue of people who were unable to assist in their own recovery. This was a hazardous operation in the prevailing sea conditions and placed SAR-1’s crew at risk. The shortcomings in the operational capabilities of SAR-1 compared to the likely rescue scenarios to which the vessel was intended to respond had not been identified during its design or in its operation since entering service. 2.7.2 Automated External Defibrillator SAR-1 was initially equipped with an AED for use on casualties rescued from the water. Although on order, the replacements for the AED’s expired pads had not been received and the defibrillator was not on board on the day of the accident. Though the CPR administered by the daughter and crew of SAR-1 provided the best option for saving Robin in the circumstances, a functioning AED might have changed the outcome of this accident.
26 SECTION 3 – CONCLUSIONS 3.1 SAFETY ISSUES DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS
Calypso 2 was too close to the rocks in the onshore surf and ground seas. It was swamped and propelled into the rocks and cliffs by a large wave before it could be manoeuvred away. [2.3.1]
There was no assessment of the risk of entering the cove. The lack of appreciation of risk placed the people on board Calypso 2 in danger when the decision was made to enter the cove. [2.3.1, 2.3.5, 2.4.2]
Calypso 2 had sufficient available engine power to be manoeuvred out of the cove. That it was not indicates that either that there was no one at the helm or the person at the helm did not recognise the risk and so act to manoeuvre the vessel away from the cliffs. [2.3.2]
No one on board Calypso 2 was wearing a PFD. This omission reduced each person’s chances of survival once they entered the water. [2.3.3]
Calypso Charters Ltd lacked adequate systems for the management of operations and therefore the activities of the vessel were not managed in a way that ensured the safety of the people on board Calypso 2. [2.4] 3.2 SAFETY ISSUES NOT DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS
Neither the VHF DSC distress function nor the EPIRB were activated during the emergency response phase. The management of the initial response was unaware that a vessel was involved in the incident initially reported. [2.3.4, 2.6]
No effective oversight was exercised over compliance with the safety management requirements contained in the SCV Code during inspections leading to the certification of small commercial vessels. Vessels on domestic operations in Anguilla were not subject to scrutiny that assured their safe operation. [2.4.1]
The requirement for the installation of AIS on small commercial vessels was not effectively enforced. The opportunities for monitoring the operation of small commercial vessels in coastal waters both to inform emergency response and to facilitate the assessment of risks in the sector were missed. [2.5, 2.6]
SAR-1 was not fitted with a suitable means of recovering an unconscious person from the water necessitating the crew entering the water to effect a rescue, which placed them at risk. [2.7.1]
SAR-1 was awaiting replacement defibrillator pads for the AED carried on board. The lack of equipment reduced the ability of the crew of SAR-1 to provide medical assistance to casualties recovered on board. [2.7.2]
27 SECTION 4 – ACTION TAKEN 4.1 ACTIONS TAKEN BY OTHER ORGANISATIONS The Anguilla Fire and Rescue Service has:
● Updated the inventory of equipment carried by shore-based assets when responding to coastal accidents.
● Updated the navigational and search equipment on board SAR-1.
● Replaced the AED on board SAR-1.
● Completed a multiagency tabletop response exercise with the Dutch Caribbean and French coastguards on Saint Martin.
● Engaged with organisations in the UK and Caribbean area for training in search and rescue operations.
● Reviewed and amended its firefighter training schedule.
28 SECTION 5 – RECOMMENDATIONS The Anguilla Maritime Administration and Shipping Registry is recommended to: 2025/106 In collaboration with the Maritime and Coastguard Agency, develop and implement a marine safety management system that encompasses the recommendations made in the Navigation Risk Assessment for Internal Waters, Anguilla completed on 7 July 2023. 2025/107 Ensure compliance with the Anguilla Maritime Administration and Shipping Registry requirement for the installation of automatic identification system transponders on board small commercial vessels carrying less than 12 passengers. 2025/108 Ensure that the safety management requirements of Chapter VIII section 4.10 of the Code of Safety for Small Commercial Vessels Operating in the Caribbean Trading Area, 2021 form part of the assessment of small commercial vessels at inspections conducted for their certification. The Royal Anguilla Police Force is recommended to: 2025/109 Review and implement amendments to its operational procedures for the management and allocation of appropriate resources to marine incidents. The Anguilla Fire and Rescue Service is recommended to: 2025/110 Review and modify the arrangements of SAR-1 to ensure that its operational capabilities include the ability to retrieve unconscious people from the water. Calypso Charters Ltd is recommended to: 2025/111 Develop and implement a safety management system for its domestically operating vessels in compliance with the requirements of Chapter VIII section 4.10 of the Code of Safety for Small Commercial Vessels Operating in the Caribbean Trading Area, 2021. Safety recommendations shall in no case create a presumption of blame or liability
Annex A Anguilla Maritime Administration Information Sheet
Courtesy of Anguilla Maritime Administration & Shipping Registry
Courtesy of Anguilla Maritime Administration & Shipping Registry
Marine Accident Report
FD06083 | 2026_英国_serious-injury-to-a-crew-member-on-board-the-scallop-dredger-jacoba-bm77__2026-14-Jacoba-R.pdf
分类:06_境外及港澳台调查报告 | 年份:2026 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
ACCIDENT REPORT ACCIDENT REPORT Report on the investigation of the serious injury to a crew member on board the scallop dredger Jacoba (BM77) 29 nautical miles south-south-east of Beachy Head, England on 10 May 2025 MARINE CASUALTY REPORT NO 14/2026 JUNE 2026
Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2026 – Regulation 5: The sole objective of a safety investigation into an accident under these Regulations is the prevention of future accidents through the ascertainment of its causes and circumstances. It is not the purpose of such an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame. NOTE This report is not written with litigation in mind and, pursuant to Regulation 19(1) of The Merchant Shipping (Accident Reporting and Investigation) Regulations 2026, shall be inadmissible in any judicial proceedings concerning liability unless the Chief Inspector of Marine Accidents or a court of law determine otherwise. © Crown copyright, 2026 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. All MAIB publications can be found on our website: www.gov.uk/maib For all enquiries: Marine Accident Investigation Branch First Floor, Spring Place 105 Commercial Road Southampton SO15 1GH United Kingdom Email: iso@maib.gov.uk Telephone: +44 (0)23 8039 5500 Press enquiries during office hours: +44 (0)19 3244 0015 Press enquiries out of hours: +44 (0)30 0777 7878
CONTENTS GLOSSARY OF ABBREVIATIONS AND ACRONYMS SYNOPSIS 1 SECTION 1 – FACTUAL INFORMATION 2 1.1 Particulars of Jacoba and accident 2 1.2 Narrative 3 1.3 Environmental conditions 6 1.4 Jacoba 6 1.4.1 General description and fishing method 6 1.4.2 Crew 7 1.4.3 Deckhand 1 8 1.4.4 Crew induction 8 1.4.5 Owner 8 1.4.6 Safety management and risk assessment 8 1.4.7 Maritime and Coastguard Agency inspections 9 1.5 Regulation and guidance 10 1.5.1 Training 10 1.5.2 Survey and inspection 10 1.5.3 Maritime and Coastguard Agency guidance to surveyors 11 1.5.4 Health and safety 11 1.5.5 Fishing vessel safety management 12 1.6 Previous/similar accidents 12 1.6.1 Olivia Jean – fatal injury 12 1.6.2 Cornishman – fatal injury 13 1.6.3 Previous accidents in the Poseidon Trawlers Limited fleet 13 SECTION 2 – ANALYSIS 14 2.1 Aim 14 2.2 Overview 14 2.3 Jacoba 14 2.3.1 The accident 14 2.3.2 Safe systems of work 15 2.3.3 Familiarisation 15 2.3.4 Training and certification 16 2.3.5 Responsibility for safety 16 2.3.6 Survey and inspection 17 SECTION 3 – CONCLUSIONS 18 3.1 Safety issues directly contributing to the accident that have been addressed or resulted in recommendations 18 3.2 Safety issues not directly contributing to the accident that have been addressed or resulted in recommendations 18 SECTION 4 – ACTION TAKEN 19 4.1 MAIB actions 19 4.2 Actions taken by other organisations 19 SECTION 5 – RECOMMENDATIONS 20
FIGURES Figure 1: The accident location Figure 2: Jacoba’s working deck, showing key equipment and deckhand positions at the time of the accident Figure 3: Jacoba’s port dredging equipment, showing the position of deckhand 1 at the time of the accident Figure 4: Jacoba alongside, showing the configuration of the scallop dredges Figure 5: Safety folder beam risk assessments Figure 6: Jacoba's deck plan, showing identified safe zones TABLES Table 1: Jacoba’s crew training records ANNEXES Annex A: MAIB safety flyer to the fishing industry
GLOSSARY OF ABBREVIATIONS AND ACRONYMS
CoC
Certificate of Competency
FSE
Flag State Endorsement
FVC
Fishing Vessel Certificate
HMCG
His Majesty’s Coastguard
ILO
International Labour Organization
ILO 188
International Labour Organization Work in Fishing Convention No.188 JRCC
Joint Rescue Coordination Centre
MCA
Maritime and Coastguard Agency MGN
Marine Guidance Note MRCC
- Maritime Rescue Coordination Centre
MSIS
Marine Survey Instructions for the Guidance of Surveyors
MSN
Merchant Shipping Notice OS
ordinary seaman PFD
- personal flotation device
SMS
safety management system
STCW
International Convention on Standards of Training, Certification and Watchkeeping for Seafarers 1978, as amended
TMAS
Telemedical Maritime Assistance Service UTC
universal time coordinated TIMES: all times used in this report are UTC +1 unless otherwise stated.
1 SYNOPSIS On 10 May 2025, a deckhand on the UK registered fishing vessel Jacoba was seriously injured while the vessel was dredging for scallops in the English Channel. The deckhand was attempting to clear a snagged dredge bag chain and was positioned in between the vessel’s port side main beam and tipping bar. When Jacoba’s mate lowered the main beam to assist with freeing the snag the beam struck the deckhand, causing serious crush injuries. The injured deckhand was given first aid on board and evacuated by helicopter to hospital where they remained for 3 months before being repatriated to their home country. As a result of their injuries, the deckhand has been unable to return to work since the accident. The investigation found that the vessel’s risk assessments did not adequately address routine dredging tasks such as clearing snagged gear and that crew familiarisation with scallop dredging hazards was limited. Safety management on board relied largely on informal practices, with limited task‑specific procedures or owner oversight. Incomplete training and certification requirements further reduced assurance that the crew had the necessary safety knowledge and skills. Since the accident, Jacoba’s owner, Poseidon Trawlers Limited, has taken a number of actions including making physical changes to the vessel, introducing assessments for winch operators and starting to implement a safety management system. Poseidon Trawlers Limited has been recommended to expedite the implementation of a safety management system that aligns with the principles outlined in Maritime and Coastguard Agency guidance. The company has also been recommended to review its risk assessments for scallop dredging and to ensure crew have undertaken the required training. JacobaView across water to the port side of the dredger Jacoba berthed starboard side to a pier in harbour. Eleven chain bags hang over the side at bulwark height, suspended from a horizontal tipping bar.
2 SECTION 1 – FACTUAL INFORMATION 1.1 PARTICULARS OF JACOBA AND ACCIDENT VESSEL PARTICULARS Vessel’s name Jacoba Flag UK Classification society Not applicable IMO number/fishing numbers 8808941/BM77 Type Scallop dredger Registered owner Poseidon Trawlers Limited Manager(s) Poseidon Trawlers Limited Construction Steel Year of build 1988 Length overall 22.18m Registered length 19.65m Gross tonnage 126 Minimum safe manning 4 Authorised cargo Fish/shellfish VOYAGE PARTICULARS Port of departure Portsmouth, England Port of arrival Brixham, England Type of voyage Fishing Cargo information Scallops Manning 6 MARINE CASUALTY INFORMATION Date and time 10 May 2025 at about 0236 Type of marine casualty or incident Marine Casualty1 Location of incident English Channel, 29nm south-south-east of Beachy Head, England Place on board Main deck, port side Injuries/fatalities 1 injury Damage/environmental impact None Vessel operation Fishing Voyage segment Mid-water External & internal environment 1m wave height; wind north-easterly force 4; good visibility and clear skies Persons on board 6 1 The Jacoba investigation was started under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 (as amended) which were revoked by the Merchant Shipping (Accident Reporting and Investigation) Regulations 2026. Under the 2012 Regulations the accident on board Jacoba was categorised as a Less Serious Marine Casualty.
3 1.2 NARRATIVE On 8 May 2025, Jacoba departed Portsmouth, England at approximately 1010 and proceeded to fishing grounds in the English Channel. At about 0045 on 9 May 2025, Jacoba started dredging for scallops in the eastbound lane of the traffic separation scheme and continued operating in the area (Figure 1) for the next 24 hours. The vessel completed 17 trawls over this period, with the crew working a 6-hour watch rotation. At midnight on 10 May 2025, the mate took over the watch from the skipper in the wheelhouse and deckhand 1 and deckhand 2 started their watch. At 0227, the mate began hauling the second dredge of their watch. The deckhands heard the winches operating and proceeded onto the main deck. Deckhand 1 went to the port side and deckhand 2 to the starboard side (Figure 2). Map of the British Isles overlaid with an illustrated red shaded circle, highlighting the accident location off the south-east coast of England. Figure 1: The accident location Figure 2: Jacoba’s working deck, showing key equipment and deckhand positions at the time of the accident For illustrative purposes only: not to scale AFT FORWARD Mate Deckhand 1 Deckhand 2 Securing chain and hook Close-up, looking along the dredge frame to a vertical chain secured to the main beam at one end and the vessel’s structure at the other. Snagged tipping chain Close-up of a pair of gloved hands using a spanner to try to free a chain snagged in the teeth of a dredge frame.
4 As Jacoba’s derricks were raised, the gear was bowsed into the side of the hull and raised up to the edge of the port and starboard bulwark and conveyor. The deckhands then attached two securing chains to each of the main beams, one at the aft end followed by one at the forward end. As the main beam on the port side was heaved tight against the chains, the chain connecting the bottom of the chain link dredge bag to the tipping bar became caught on the teeth of one of the dredge frames. The mate adjusted the main beam by lowering and heaving it slightly while deckhand 1 reached across the conveyor to try to manually free the chain from the teeth. While deckhand 1 was trying to free the chain on the port side the mate heaved the main beam on the starboard side and deckhand 2 started adjusting the starboard side dredges. Deckhand 1 climbed onto the port side conveyor and continued to attempt to free the caught chain. The mate again lowered and raised the port side main beam slightly to try and dislodge the chain as deckhand 1 sat on the inner edge of the conveyor. Deckhand 1 then stepped up onto the outer edge of the conveyor to access the shackle connecting the chain to the tipping bar, intending to undo the shackle to allow the chain to be removed and freed. Deckhand 1 then stepped back to the middle of the conveyor and leaned forward between the main beam and tipping bar. At 0236, the mate again slackened the port side main beam to help deckhand 1 undo the shackle. As the mate operated the winch control both the port and starboard main beams lowered. The port side main beam struck deckhand 1 on the back, lifting them off the conveyor and pinning them between the main beam and tipping bar (Figure 3). The mate immediately raised the main beams and deckhand 1 fell onto the conveyor and rolled onto the deck, kicking and writhing in pain. The mate exited the wheelhouse onto the deck and went with deckhand 2 to assist deckhand 1. They removed deckhand 1’s personal flotation device (PFD) and gloves. The mate checked that deckhand 1 was breathing and assessed them for injuries; they did not identify any swelling or bleeding. Deckhand 1 was in a lot of pain and was kicking their legs. Because deckhand 1 could move their legs the mate decided that it was safe for deckhand 1 to be moved and alerted the skipper and off watch deckhands, who mustered to assist. At about 0250, Jacoba’s skipper contacted His Majesty’s Coastguard (HMCG) and was informed that Jacoba was operating within the French sector. HMCG passed coordination responsibility to Gris-Nez Maritime Rescue Coordination Centre (MRCC). At 0327, the crew moved deckhand 1 down the port side of the vessel and into the mess at the rear of the accommodation. At 0404, Gris-Nez MRCC contacted Jacoba. During this exchange the skipper declined assistance from French authorities, including an offer of support from the Telemedical Maritime Assistance Service (TMAS). The skipper expressed a preference for UK assistance and indicated an intention to return to Portsmouth.
5 At 0406, coordination was transferred to the UK Joint Rescue Coordination Centre (JRCC). At 0433, the JRCC facilitated a TMAS consultation between the skipper and a doctor. Concerned about the possibility of crush injuries, the doctor determined that helicopter evacuation was medically necessary. At 0530, a rescue helicopter arrived on scene and lowered a paramedic to Jacoba by winch. At 0630, deckhand 1 was transferred to the helicopter and evacuated to hospital. Deckhand 1 remained hospitalised with serious crush injuries until 11 August 2025, when they were repatriated to India. Figure 3: Jacoba’s port dredging equipment, showing the position of deckhand 1 at the time of the accident Main beam Tipping bar Conveyor Dredge teeth
6 1.3 ENVIRONMENTAL CONDITIONS The wind was north‑easterly at up to 14 knots, accompanied by slight seas and a low easterly swell. Visibility was good, with clear skies. 1.4 JACOBA 1.4.1 General description and fishing method Jacoba was a 22.18m fishing vessel built in 1988 as a scallop dredger and later converted to a beam trawler. The vessel was purchased by the current owner in 2021 and reconverted to operate as a scallop dredger. Jacoba carried two sets of scallop dredges, one on either side of the vessel. Each set comprised 11 dredges (Figure 4). The dredges comprised triangular steel frames fitted with bars lined with metal teeth and chain link dredge bags for collecting scallops. The upper end of the dredge frame was attached to a main beam, while the dredge bags were connected by short lengths of chain to a secondary beam known as the tipping bar. During fishing operations the dredges were towed along the seabed behind the main beam. As the dredges moved across the seabed the teeth disturbed the sediment and dislodged scallops, which were collected in the chain link bags. The vessel’s winches hauled in the towing warps connected to the main beams to recover the dredges. As the gear reached the surface, the derricks were raised to bowse the dredges alongside the vessel. The crew then secured each main beam with chains at the forward and aft ends to hold the gear in position. Figure 4: Jacoba alongside, showing the configuration of the scallop dredges View across water to the port side of the dredger Jacoba berthed starboard side to a pier in harbour. An illustrated rectangular outline highlights a row of 11 chain bags hanging over the side at bulwark height. The bags are suspended from a horizontal tipping bar secured beneath a horizontal main beam attached to a raised derrick. 11 x dredges per side Main beam Derrick Tipping bar
7 To empty the dredges, the crew connected a wire to the tipping bar. When this wire was hauled in the tipping bar was raised above the main beam, causing the dredge bags’ contents to be tipped into conveyor trays positioned along each side of the main deck. The crew sorted the catch at the conveyor trays. There had been several previous incidents on Jacoba of the chains connecting the dredge bags with the tipping bar becoming caught in the teeth of the dredges, requiring the crew to free the dredge bags before their contents could be tipped. To free these snags, the crew unpinned the shackle connecting the chain to the tipping bar with the main beam suspended. 1.4.2 Crew Jacoba had a crew of six; the skipper, mate and four deckhands. The skipper, mate and one of the deckhands were Latvian nationals and had been recruited via a Latvian crew agency. The other three deckhands, two Indian nationals and one Ghanaian national, had been recruited via a UK-based crew services agency. The crew’s certification is summarised in Table 1. Jacoba’s skipper held a Latvian Certificate of Competency (CoC) to serve as master on fishing vessels of less than 45m operating in unlimited waters. The certificate did not hold a UK Flag State Endorsement (FSE). The skipper had sailed on Jacoba as mate between August 2023 and August 2024 and was promoted to master on 30 August 2024. The skipper qualified as a master on fishing vessels on 23 April 2025, having previously held a Latvian navigational watch officer CoC for fishing vessels of less than 45m operating in unlimited waters. The mate had sailed on Jacoba for 25 days during 2024 with no prior fishing experience, before rejoining the vessel on 5 April 2025. The mate had previously served on tankers, as an ordinary seaman (OS) in 2023 and as an able seaman in
- The mate held a Latvian certificate for an ordinary seaman with a navigational
watch rating. Course Role STCW2 Personal Survival Techniques STCW Elementary First Aid STCW Fire Prevention and Fire Fighting Seafish3 Basic Health and Safety Seafish Safety Awareness and Risk Assessment4 Skipper Yes Yes Yes No Yes Mate Yes Yes Yes No Not applicable Deckhand 1 Yes Yes Yes No Not applicable Deckhand 2 Yes Yes Yes No No Deckhand 3 Yes Yes Yes No Not applicable Deckhand 4 Yes Yes Yes No Not applicable Table 1: Jacoba’s crew training records 2 International Convention on Standards of Training, Certification and Watchkeeping for Seafarers 1978, as amended. 3 Seafish is a non-departmental public body that supports the seafood industry in the UK. 4 The mate and deckhands 1, 3 and 4 had been working in the fishing industry for less than 2 years and were not required to complete this course.
8 1.4.3 Deckhand 1 Deckhand 1 was a 23-year-old Indian national who had joined Jacoba on 20 December 2024. Before joining Jacoba, deckhand 1 had served as an OS on bulk carriers in 2023-24 and had previously worked on a fishing vessel in Dubai. At the time of the accident deckhand 1 was wearing bib and brace oilskin trousers, rubber boots, gloves and a PFD. Deckhand 1’s injuries included a collapsed lung, liver trauma, multiple fractured ribs and spinal fractures. Deckhand 1 was unable to return to work due to their injuries and continues to receive medical care. 1.4.4 Crew induction On board Jacoba, newly joined crew members completed a crew induction form that comprised three sections and was reviewed and signed by the skipper. The induction form covered:
● the location and use of safety and firefighting equipment
● routine vessel operations and general onboard procedures
● actions to be taken in the event of an emergency. The form included a single tick box relating to fishing equipment and safety. Practical familiarisation consisted of a walk around the vessel, after which new crew members observed vessel operations for one watch before undertaking a watch under supervision. 1.4.5 Owner Jacoba was owned and operated by Poseidon Trawlers Limited. The company operated two scallop dredgers at the time of the accident and had recently sold a third vessel, Our Heather, following a fire in 2024 (see section 1.6.3). The company’s two directors worked as skipper on the other vessel and owned a local chandlery that produced scallop dredging gear, respectively. 1.4.6 Safety management and risk assessment Jacoba’s owners maintained a fishing vessel safety folder on board the vessel. The folder contained documented safety policies and risk assessments and referenced the Merchant Shipping and Fishing Vessels (Health and Safety at Work) Regulations 1997 and the International Labour Organization Work in Fishing Convention No.188 (ILO 188). Jacoba’s risk assessments included a section titled Beam trawling/dredging that included two risk assessments relating to the vessel’s beams (Figure 5). A plan of the vessel’s deck was displayed in the galley and included hand‑drawn markings identifying safe zones while hauling and shooting the gear (Figure 6).
9 1.4.7 Maritime and Coastguard Agency inspections On 2 August 2023, the Maritime and Coastguard Agency (MCA) issued Jacoba with a Fishing Vessel Certificate valid for 5 years following an inspection on 24 July 2023. On 7 August 2024, the MCA inspected Jacoba as part of a focused inspection campaign targeting lifting equipment. The inspection identified several deficiencies including that the documented lifting plan did not detail inspection and maintenance regimes, the responsibilities or competence of the nominated competent person or defect reporting arrangements. The inspection also identified that there was no risk assessment covering lifting operations. On 12 September 2024, an inspection as part of a grant approval recorded that the deficiencies identified in Jacoba’s August 2024 inspection remained outstanding. Extract from a table titled Beam trawling/dredging last edited/reviewed on 6 February 2025. The table comprises six columns and two rows setting out version 3 of two identified risks, and the hazard area/activity, specific detail, controls in place, risk outcomes and assessed risk level for each. The identified beam and beam retrieval risks have been assessed as low risk and highlighted in green to correspond with this level. refer to the risk of being struck by the beam, resulting in broken bones and crush injuries, and list correct PPE as a control measure. Figure 5: Safety folder beam risk assessments Image copied from on board document Plan drawing overlaid with two illustrated safe zones during hauling and shooting, one at the forward centreline, the other port side aft. The corresponding handwritten key identifies both safe zones as visible from the wheelhouse. Figure 6: Jacoba's deck plan, showing identified safe zones Image copied from on board document
10 On 8 October 2024, Jacoba underwent a targeted general inspection by the MCA. All previously identified deficiencies were recorded as rectified. Eleven new deficiencies were identified, mainly for machinery and fittings. One deficiency related to crew training and certification, noting that one crew member was Missing Basic Safety Awareness and another was Missing Experienced Fisherman’s course. The MCA required the courses to be completed at the earliest opportunity and certificates evidence submitted to MCA within 3 months. This deficiency was assigned an Action Code 99 – Master instructed to and an Action Code 98 – Master to notify MCA Marine Office when rectified. At the time of the accident, 10 of the deficiencies identified during the inspection on 8 October 2024 remained open, including the deficiency relating to crew training. Only deckhand 3 had also been on board Jacoba during the October 2024 inspection. 1.5 REGULATION AND GUIDANCE 1.5.1 Training Crew members serving on board UK registered fishing vessels were required to complete the mandatory safety training specified in Marine Guidance Note (MGN) 411 (M+F)5. Before starting work, all new crew members were required to complete a 1‑day basic sea survival course. Within 3 months of starting work, new crew members were also required to complete the following mandatory courses:
●1 day Basic Fire Fighting and Prevention
●1 day Basic First Aid; and
●1 day Basic Health and Safety Additionally, experienced fishermen were required to complete the Seafish6 1‑day Safety Awareness and Risk Assessment course. MGN 411 (M+F) defined experienced fishermen as those with 2 years’ experience or more. The MCA accepted STCW certificates as equivalent training for the sea survival, first aid, and firefighting and prevention courses. There was no STCW alternative for the 1-day Basic Health and Safety and 1-day Safety Awareness and Risk Assessment courses and only Seafish approved training providers could deliver these courses. There were no Seafish approved training providers outside the UK. 1.5.2 Survey and inspection Fishing vessels over 15m and less than 24m in length were required to comply with Merchant Shipping Notice (MSN) 1872 (F) Amendment 17. Vessels operating under the Code contained in this MSN were subject to MCA surveys and inspections to verify compliance with the applicable construction, stability, machinery, safety equipment, and operational standards. 5 MGN 411 (M+F) – Training and Certification Requirements for the Crew of Fishing Vessels and their Applicability to Small Commercial Vessels and Large Yachts. 6 Seafish is a non-departmental public body that supports the seafood industry in the UK. 7 MSN 1872 (F) Amendment 1 – The Code of Safe Working Practice for the Construction and Use of Fishing Vessels of 15m Length Overall to less than 24m Registered Length.
11 Following successful inspection, vessels were issued with a UK Fishing Vessel Certificate (FVC) valid for 5 years. Fishing vessel skippers were required to endorse the certificate annually between MCA renewal inspections to confirm their vessel’s ongoing compliance with MSN 1872 (F) Amendment 1; the MCA deemed the FVC to be invalid if the vessel or its operation deviated from the requirements. The MCA publication Fishing Vessel Surveys and Inspections – How to prepare for your next MCA visit provided advice for owners, skippers, and fishermen to ensure a successful outcome following an inspection or survey. The listed requirements, documents and evidence to be available for inspection included crew training certificates and copies of risk assessments. 1.5.3 Maritime and Coastguard Agency guidance to surveyors The MCA provided its surveyors with Marine Survey Instructions for the Guidance of Surveyors (MSIS) detailing the conduct of vessel surveys and inspections. MSIS 27 – Survey and Inspection of Fishing Vessels, chapters 1 to 17 was the applicable volume for surveyors of fishing vessels8. On training and crew qualifications, MSIS 27 specified the requirements for surveyors as defined by the Fishing Vessels (Safety Training) Regulations 1989, which came into force on 1 March 1989. The 2004 amendment to these regulations required that experienced fishermen obtain a certificate certifying that they had completed the Safety Awareness and Risk Assessment course. 1.5.4 Health and safety In March 2019, the MCA published MGN 587 (F) Amendment 19, which provided further guidance on the application of ILO 188. MGN 587 (F) Amendment 1 contained information and guidance on health and safety responsibilities and stated that:
●A documented risk assessment is required, and safety measures put in place.
●All fishermen must have enough training so that they can work safely on board, including familiarization with on-board equipment and procedures.
●Each fisherman has a duty to look after their own health and safety and that of others working with them, and comply with the measures put in place for their safety. On the duties of the fishing vessel owner and skipper, the MGN stated that:
●The fishing vessel owner…has overall responsibility to ensure that the skipper is provided with the necessary resources and facilities to comply with the Regulations. The fishing vessel owner should set the health and safety policy for the vessel so that the skipper is clear what is expected.
●The skipper therefore has responsibility for the safety of fishermen on board the vessel and the safe operation of the vessel. In fulfilling their responsibility the MCA expects skippers to – 8 Revision 12.23 9 MGN 587 (F) Amendment 1 International Labour Organization Work in Fishing Convention (No.188) – Health and safety: responsibilities of fishing vessel owners, managers, skippers, and fishermen.
12 a) Provide supervision to ensure that fishermen work safely at all times; b) Manage fishermen in a manner which respects safety and health, including prevention of fatigue; c) Arrange regular on-board occupational safety and health awareness training 1.5.5 Fishing vessel safety management The MCA’s MGN 596 (F)10 was published to assist fishing vessels to follow the guidance in MGN 587 (F) Amendment 1 and comply with MSN 1872 (F) Amendment
- MGN 596 (F) encouraged the creation of a safety management system (SMS) for
fishing vessels and recommended that the documentation developed and records maintained should include, among others:
●The Safety Management Manual;
●Company Safety and Environment Policies;
●All crew certification and training records;
●Vessel Operation (operating procedures and the risk assessment);
●Testing/Certification relating to the lifesaving appliances and fire- fighting equipment;
●Records of drills and safety training. 1.6 PREVIOUS/SIMILAR ACCIDENTS 1.6.1 Olivia Jean – fatal injury On 28 June 2019, a crew member was fatally injured on board the scallop dredger Olivia Jean when he was struck on the head by a scallop dredge towing bar11 (MAIB report 5/202112). The accident occurred during deck operations to replace worn dredges on the starboard towing bar. While the skipper was using the winch and derrick to lift and realign the dredge gear, one of the towing bar’s securing chains had not been released and the gear became snagged. As the skipper attempted to free the snagged gear, the towing bar suddenly released and swung inboard, striking the crew member on the head. The crew member sustained serious head injuries and was evacuated to hospital but died 12 days later. At the time of the accident, the skipper was operating the winches from the wheelhouse while deck operations were being carried out on the working deck. The MAIB investigation identified that deck operations were not being effectively supervised or controlled and that the risk controls identified in the vessel’s risk assessments were not being applied during the lifting operation. 10 MGN 596 (F): Fishing Safety Management Code: Helping to Improve the Management of Safety on Fishing Vessels. 11 An alternative term used by the vessel to refer to the main beam. 12 MAIB report 5/2021: Olivia Jean
13 1.6.2 Cornishman – fatal injury On 6 February 2021, a deckhand was fatally injured on board the beam trawler Cornishman when he was struck by the port trawl beam (MAIB report 8/202513). The accident occurred while the crew were carrying out repairs to the port trawl gear with the trawl beam hoisted and suspended above the deck. During the repair a chain forming part of the quick‑release gear supporting the beam failed without warning, causing the beam to fall and strike the deckhand. The investigation found that the chain failure was the result of material and design factors, including the use of a chain that was unsuitable for the marine environment and installation geometry that introduced additional stresses. The investigation also identified that risk assessments had not been effectively applied and that crew members were exposed to the hazards of working beneath suspended loads. The report made several recommendations, including to Cornishman’s owners to review and update its risk assessments. 1.6.3 Previous accidents in the Poseidon Trawlers Limited fleet On 10 July 2024, a crew member on board the scallop dredger Our Heather sustained a head injury and lacerations while attempting to clear stones from the dredging gear. The injured crew member was evacuated by helicopter to hospital. On 22 September 2024, a crew member on board Our Heather suffered serious burn injuries during an engine room fire. The fire occurred following the use of an unapproved fuel system that the owner had installed on board the vessel. On 6 April 2025, a crew member on board Jacoba sustained leg injuries when their leg became trapped between the chain securing one of the main beams and a vertical bar on the deck while the dredging gear was being operated. The crew member was taken to hospital for treatment. 13 MAIB report 8/2025: Cornishman
14 SECTION 2 – ANALYSIS 2.1 AIM The purpose of the analysis is to determine the contributory causes and circumstances of the accident as a basis for making recommendations to prevent similar accidents occurring in the future. 2.2 OVERVIEW Jacoba’s deckhand was seriously injured after being crushed between the vessel’s port side main beam and tipping bar. The deckhand was trying to free a snagged chain at the time and was working underneath the main beam. When the mate lowered the main beam to assist with freeing the snag it struck the deckhand, causing serious crush injuries. The analysis will consider the factors contributing to deckhand 1’s serious injury, including the crew’s actions, training, safe systems of work and the owner’s responsibilities. 2.3 JACOBA 2.3.1 The accident Deckhand 1 was working to clear a snagged dredge bag chain, which was a necessary task because the snag was preventing the catch from being recovered on board. Deckhand 1 had placed themselves underneath the suspended port side main beam to access the dredge bags and free the snagged chain. While deckhand 1 was underneath the main beam, the mate lowered it. The main beam struck deckhand 1 and crushed them against the port side tipping beam. The mate adjusted the port side main beam in the belief that this would assist deckhand 1 to free the snagged chain. However, this action involved moving the main beam while a crew member was positioned outside the vessel’s documented safe zones and near suspended and moving gear. The vessel’s risk assessments specified that crew members should remain within identified safe zones and clear of all moving gear during beam operations. The decision to operate the winch controls and lower the main beam under these circumstances therefore increased the risk to the deckhand. The benign prevailing weather conditions at the time of the accident are not considered to have been a contributory factor. Sea conditions were slight, with a low swell, and were unlikely to have caused significant vessel motion. Any contribution to the movement of the port side main beam was therefore likely to have been minimal. Jacoba’s crew had experienced similar snags in the past during recovery of the fishing gear and had successfully freed these snags manually. Without documented guidance or any formal procedure for dealing with this situation, it is likely that deckhand 1 and the mate relied on previous successful outcomes and did not appreciate the risk involved in adjusting the main beam while the deckhand was working beneath suspended gear.
15 2.3.2 Safe systems of work Jacoba’s safety folder included a risk assessment for beam trawling and dredging. Although the risk of being struck by the main beam had been identified, the risk level was recorded as low and contradicted the recorded potential outcome of death or serious injury. Additionally, there was no task-specific risk assessment for recovering and tipping the scallop dredges nor a procedure for clearing snags. The documented risk assessments did not adequately identify or address the hazards associated with working near suspended and moving dredging gear. Beam trawling and dredging risks were grouped together and categorised as low risk, and control measures were limited to general statements such as wearing personal protective equipment and staying inside designated safe zones. There was no documented guidance explaining how to apply these controls in the event of abnormal or unexpected situations. The absence of clear, task‑specific procedures meant that Jacoba’s crew relied on informal practices to manage routine hazards during dredge recovery. This reduced the effectiveness of the vessel’s safe systems of work and increased the likelihood of crew members being exposed to hazardous situations, including working beneath or close to suspended and moving gear. The Olivia Jean and Cornishman investigations identified similar risk assessment and risk control issues. Jacoba’s risk assessments did not adequately address the operation of scallop dredging gear, resulting in associated hazards being ineffectively mitigated and placing the crew at risk. 2.3.3 Familiarisation Although both deckhand 1 and the mate had previous seagoing experience, this was mainly outside the fishing industry and they had limited experience of working on scallop dredgers. On joining Jacoba, both had completed a crew induction form and received a short practical familiarisation that included a walk around the vessel and one watch under supervision. The induction and familiarisation arrangements in place on Jacoba did not adequately address the specific hazards associated with scallop dredging operations. The crew induction form was generic, with a single tick box reference to fishing equipment and safety. There was no evidence of task‑specific familiarisation covering the operation of dredging gear, the risks associated with working near suspended and moving equipment, or safe methods for dealing with routinely encountered situations such as clearing snagged gear. The limited practical familiarisation did not ensure that new crew sufficiently understood the vessel’s gear, nor did it adequately prepare the mate for the operation of winches and dredging equipment under abnormal conditions. The absence of effective, task‑specific familiarisation exposed new crew members to operational hazards without a clear understanding of the associated risks or the control measures required to manage them. This increased reliance on informal practices and previous experience, which was in this case limited for scallop dredging operations. The lack of effective crew familiarisation meant that hazards were not fully understood, creating conditions for unsafe conduct during routine operations.
16 2.3.4 Training and certification Jacoba’s crew were recruited through two crewing agencies and none were UK nationals. At the time of the accident, the skipper did not have UK FSE and none of the crew members had completed the basic health and safety training required to work on a UK‑registered fishing vessel. The basic health and safety training could not be completed outside of the UK and was required within 3 months of joining the industry. Jacoba’s owner was responsible for ensuring that crew members met UK training and certification requirements but had evidently not enforced this. Mandatory safety training provides a baseline level of knowledge to support hazard awareness, safe working practices, and effective responses to routine and abnormal operations. Where such training is incomplete, crews may lack essential safety skills and rely instead on informal knowledge or previous experience gained on different vessel types. The risk is particularly relevant on scallop dredgers, where crew are routinely exposed to hazards associated with lifting operations, suspended gear and moving equipment. Although Jacoba was subject to periodic MCA inspections, mandatory training deficiencies remained unresolved in the periods between them. Responsibility for addressing these shortcomings relied on the owner and skipper taking corrective action, which did not occur. The requirement to ensure crew had completed mandatory safety training went unenforced and Jacoba continued to operate with uncertified crew. This reduced assurance that those on board had the required safety knowledge. 2.3.5 Responsibility for safety Jacoba’s owner was responsible for ensuring that the vessel complied with the applicable statutory safety requirements and guidance in MSN 1872 (F) Amendment 1, including the implementation and maintenance of effective onboard safety management procedures such as setting the health and safety policy for vessels operated by the company and ensuring that suitable risk assessments were in place and remained appropriate for the vessels’ fishing methods and modes of operation. Such arrangements also provided an opportunity to verify that crew training, certification and familiarisation requirements were being met. MGN 596 (F) provided guidance on how to develop an SMS and outlined the documentation required to achieve this and maintain records. The accident on Jacoba was not an isolated occurrence within the owner’s fleet. Previous serious injuries had occurred on vessels operated by the same company, including an injury on board Jacoba in April 2025 and two serious injuries on board Our Heather in 2024. These accidents indicate that opportunities to identify recurring hazards and strengthen safety management arrangements across the fleet were not fully realised, reducing the owner’s ability to maintain consistent safety standards and increasing the risk to crew members. Although one of the company’s directors had operational fishing experience and regularly sailed as skipper on another vessel in the fleet, the management of Jacoba was left to the other director who had more limited operational experience and relied on the vessel’s skipper for Jacoba’s day‑to‑day operation and safety management. The guidance in MGN 587 (F) Amendment 1 recognised that the vessel’s owner
17 might have limited control of operational activities, though there was no evidence of structured oversight by the company as evidenced in the deficiencies identified with crew certification. Safety management on board Jacoba was largely informal, reflecting limited company oversight at a time when the vessel was operating with a recently promoted skipper and a mate with little fishing experience. This meant that Jacoba did not have a structured safety management framework. The absence of a fishing SMS aligned with the guidance in MGN 596 (F) reduced assurance that risks were being systematically identified, controlled and reviewed. 2.3.6 Survey and inspection The MCA had raised a crew training and certification deficiency during a targeted inspection in October 2024. The deficiency noted that one crew member had not completed basic health and safety training and another had not completed the Seafish Safety Awareness and Risk Assessment course. These courses provide crew with knowledge of on board hazards, safe working practices and the principles of risk assessment. The MCA allowed a 3-month rectification period, relying on the owner or skipper to either submit evidence of completed training or demonstrate that the uncertified crew members had left the vessel. The training deficiency remained unresolved within the 3-month timeframe, and deckhand 3 remained on board and continued to sail on Jacoba despite their lack of basic health and safety training. The MCA does not appear to have taken any follow-up inspection or enforcement action when the deficiency was not closed. The vessel therefore continued to operate for several months with a known crew certification shortfall despite the MCA having identified and recorded the issue. At the time of the accident, 7 months after the October 2024 inspection, the crew training deficiency remained open and deckhand 3 was still serving on board without the required certification. The absence of MCA follow‑up or enforcement following an identified deficiency in crew training represented a missed opportunity to ensure all crew had completed essential safety training.
18 SECTION 3 – CONCLUSIONS 3.1 SAFETY ISSUES DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS
The deckhand was seriously injured when the main beam was lowered while they were working underneath it. [2.3.1]
Without documented procedure, it is likely that the deckhand and the mate based their actions on previous experience and had not appreciated the risk of adjusting the main beam while the deckhand was working beneath suspended gear. [2.3.1] 3.2 SAFETY ISSUES NOT DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS
Jacoba’s risk assessments did not adequately address the operation of scallop dredging gear, resulting in associated hazards being ineffectively mitigated and placing the crew at risk. [2.3.2]
The lack of effective crew familiarisation meant that hazards were not fully understood, increasing reliance on informal practices and creating conditions for unsafe conduct during routine operations. [2.3.3]
The requirement to ensure crew had completed mandatory safety training went unenforced and Jacoba continued to operate with uncertified crew. This reduced assurance that those on board had the required safety knowledge. [2.3.4]
Limited company oversight and reliance on informal on board practices meant that Jacoba did not have a structured safety management framework. The absence of a fishing safety management system aligned with the guidance in MGN 596 (F) reduced assurance that risks were being systematically identified, controlled and reviewed. [2.3.5]
The absence of MCA follow‑up or enforcement following an identified deficiency in crew training represented a missed opportunity to ensure all crew had completed essential safety training. [2.3.6]
19 SECTION 4 – ACTION TAKEN 4.1 MAIB ACTIONS The MAIB has issued a safety flyer to the fishing industry (Annex A). 4.2 ACTIONS TAKEN BY OTHER ORGANISATIONS The Maritime and Coastguard Agency has:
● Completed a targeted general inspection of Jacoba following the accident on 13 May 2025, during which 29 deficiencies were identified and the vessel was detained.
● Issued a prohibition notice to Jacoba’s owner in respect of ceasing fishing operations and required the owners to implement and demonstrate a safe system of work before fishing operations could be resumed.
● Issued improvement notices for all crew members who did not hold the required Seafish Basic Health and Safety and Safety Awareness and Risk Assessment course certificates. Poseidon Trawlers Limited has: Made the following alterations to Jacoba:
● fitted extended safety hooks for securing the dredge beam when shooting/ hauling or working on the gear
● marked a safety zone on the main deck
● renewed safety chains
● installed tugger winches
● marked winch clutch controls with labels
● posted new safety notices and polices on board
● fitted a working platform/step for crew to access the conveyor. Made the following safety management changes:
● started implementing a new safety management system
● provided an updated set of risk assessments
● developed a new set of procedures
● created an assessment form to assess the competency of the crew member operating the winch
● produced a new lifting equipment inspection sheet.
20 SECTION 5 – RECOMMENDATIONS Poseidon Trawlers Limited is recommended to: 2026/149 Expedite the implementation of a fleetwide safety management system that reflects the principles set out in Marine Guidance Note 596 (F) – Fishing Safety Management Code: Helping to Improve the Management of Safety on Fishing Vessels. 2026/150 Review and update vessel risk assessments to include routine tasks associated with scallop dredging operations, ensuring these are fully assessed and that appropriate control measures are clearly defined, documented, and communicated to the crew. 2026/151 Review crewing arrangements to ensure all crew members employed on vessels it operates hold required certification in line with Marine Guidance Note 411 (M+F) – Training and Certification Requirements for the Crew of Fishing Vessels and their Applicability to Small Commercial Vessels and Large Yachts. Safety recommendations shall in no case create a presumption of blame or liability
Annex A MAIB safety flyer to the fishing industry
SAFETY FLYER TO THE FISHING INDUSTRY Serious injury to a crew member on board the scallop dredger Jacoba (BM77), 29 nautical miles south-south-east of Beachy Head, England on 10 May 2025 Narrative On 10 May 2025, a deckhand on the UK registered fishing vessel Jacoba was seriously injured while the vessel was dredging for scallops in the English Channel. The deckhand had been attempting to free a snagged dredge bag chain from the dredge teeth when recovering the dredges and was standing on the conveyor, positioned beneath the port side main beam. The mate then operated the winch from the wheelhouse and lowered the main beam, which struck the deckhand and crushed them against the tipping bar (see figure). The deckhand suffered multiple serious injuries and was evacuated to hospital by helicopter. The investigation found that the accident happened because the main beam was lowered while a deckhand was positioned beneath suspended gear. The absence of documented procedures for dealing with snagged dredging gear and an incomplete understanding of the vessel’s risk assessment meant that the risks associated with this task were not fully appreciated. Unsafe working practices were therefore able to develop during routine operations. Although some of Jacoba’s crew had previously served on commercial ships they had limited experience of fishing vessels. The absence of effective crew familiarisation combined with a lack of training specific to fishing vessels meant that the hazards of working on a scallop dredger were not fully understood. This increased reliance on informal working practices and created conditions for unsafe conduct during routine deck operations. Safety lessons
- Fishing vessels present a range of hazards specific to the fishing method and vessel layout.
Experience gained on commercial ships or other fishing vessels with a different fishing method does not necessarily prepare crew for the unique hazards of a particular vessel. Thorough, vessel-specific familiarisation builds on the foundations set out in the required basic health and safety training1 and ensures crew members understand and are prepared for the operational risks on their vessel, particularly those involving fishing gear and lifting equipment.
- Owners and skippers should ensure all crew receive mandatory training and that on board
familiarisation includes clear explanation of hazardous operations, safe working positions and agreed responses to regularly encountered problems such as snagged or fouled gear. Structured familiarisation and training specific to a vessel and its fishing method prevent informal practices or assumptions becoming accepted as routine practice, reducing the likelihood of unsafe actions that put crew at risk. 1 Marine Guidance Note 411 (M+F) – Training and Certification Requirements for the Crew of Fishing Vessels and their Applicability to Small Commercial Vessels and Large Yachts. Jacoba
This flyer and the MAIB’s investigation report are posted on our website: www.gov.uk/maib For all enquiries: Marine Accident Investigation Branch First Floor, Spring Place 105 Commercial Road Southampton SO15 1GH Email: iso@maib.gov.uk Tel: +44 (0)23 8039 5500 Publication date: June 2026 Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2026 – Regulation 5: The sole objective of a safety investigation into an accident under these Regulations is the prevention of future accidents through the ascertainment of its causes and circumstances. It is not the purpose of such an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame. NOTE This safety flyer is not written with litigation in mind and, pursuant to Regulation 19(1) of The Merchant Shipping (Accident Reporting and Investigation) Regulations 2026, shall be inadmissible in any judicial proceedings concerning liability unless the Chief Inspector of Marine Accidents or a court of law determine otherwise. © Crown copyright, 2026 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. Figure: The accident Main beam Tipping bar Dredge teeth Snagged chain
Marine Accident Report
FD06084 | 1998_加拿大运输安全委员会_Propair_SA226-TC轮舱起火坠毁_A98Q0087_火灾报告(英文).md
分类:06_境外及港澳台调查报告 | 年份:1998 | 地域: | 严重程度: | 场所: | 起火原因:燃气/爆炸 | 来源格式:md
1. 报告标题与报告编号
- 标题:Aviation Investigation Report A98Q0087
- 报告编号:A98Q0087
2. 机构与发布日期
- 机构:Transportation Safety Board of Canada(加拿大运输安全委员会,TSB)
- 发布日期:委员会授权于 2002 年 4 月 2 日发布
3. 事故摘要
- 日期:1998 年 6 月 18 日
- 地点:Montréal International Airport (Mirabel/ Dorval),Quebec
- 航空器:Propair Inc. Swearingen SA226-TC(Fairchild-Swearingen Metro II),注册号 C-GQAL
- 事件:Propair 420 航班从 Dorval 起飞约 12 分钟后机组报告液压问题并请求返航;左发动机约 0719 因起火关闭;0720 决定转降 Mirabel。进近时左发动机再次起火;起落架放下后左翼向上折断,机身倒扣接地。
- 火灾要点:左主轮舱刹车过热引发 起落架舱飞行中起火(in-flight fire — Landing gear well),火势蔓延至左翼及左发动机吊舱,地面撞击后机身起火,滑跑 2500 英尺。机上 11 人全部遇难。
4. 原因 / 因果因素
- 机组未意识到左侧拉力与起飞滑跑延长是由于左刹车拖滞(dragging brakes),导致刹车组件过热。
- 左刹车拖滞最可能由起飞时刹车上游某未知压力锁止因素引起,导致过热与泄漏(可能为某活塞密封处)。
- 液压油泄漏到高温刹车组件上着火,引燃左发动机吊舱强烈火灾,导致主液压系统失效。
- 当 L WING OVHT 灯熄灭,过热问题看似解决,但火仍在燃烧。
- 机组始终未意识到所有问题均源于轮舱火灾,未认识到情况严重。
- 左翼被翼/发动机火灾削弱并失效,导致飞机失控。
5. 安全发现
- 此前 SA226/SA227 多次刹车过热或起火事件有潜在同等悲剧后果;部分机组不了解该机型历史。
- 飞行手册与应急检查单未提供刹车过热引发轮舱火的风险信息及对应程序。
- 更严格的防火座椅要求可延缓座椅燃烧,降低乘员火灾风险。
- 两种液压油混合降低了其燃点,低于纯 MIL-H-83282 闪点。
- 维修手册称两种液压油兼容,但未提及混合会降低防火性能。
6. 安全建议 / 纠正行动
- A98-02:TC 紧急咨询 FAA 修订 SA226/SA227 飞行手册,明确过热刹车引发轮舱火风险及程序(FAA 批准修订,TC 强制采纳,已关闭)。
- A98-03:探索安装刹车温度/过热探测系统(FAA 认为成本过高未采纳,但发 AD 2000-17-01、2001-20-14 修改停机刹车及 shuttle valve 防拖刹,TC 强制)。
- A98-04:探索保护/加固轮舱液压与燃油管路(FAA 发 AD 2000-14-01 加装护罩,TC 强制)。
- A98-05 / A98-06:TC 紧急通知加拿大运营商仅用 MIL-H-83282 液压油,禁止混用(手册加警告,AD 83-19-02 要求更换标牌)。
- A02-03(后续):TC、FAA、Fairchild 探索为 SA226/SA227 每个主轮刹车系统装备刹车压力警告指示器。
- 其他:TC 发 CBAAC No. 0146 通告警示刹车过热危险;NTSB 向 FAA 提交类似建议。
FD06085 | 1999_加拿大_TSBC_R99T0031_CN_Derailment_Fire_Benzene_Neswabin_Ontario_1999.pdf
分类:06_境外及港澳台调查报告 | 年份:1999 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
RAILWAY INVESTIGATION REPORT
R99T0031
DERAILMENT
CANADIAN NATIONAL
TRAIN NO. CN M-304-41-05
MILE 255.1, RUEL SUBDIVISION
NESWABIN, ONTARIO
06 FEBRUARY 1999
The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability.
Railway Investigation Report
Derailment
Canadian National Train No. CN M-304-41-05 Mile 255.1, Ruel Subdivision Neswabin, Ontario 06 February 1999
Report Number R99T0031
Synopsis
On 06 February 1999, at approximately 1628 eastern standard time, Canadian National eastward freight train No. M-304-41-05, travelling from Hornepayne, Ontario, to Toronto, Ontario, derailed 20 cars at Mile 248.5 of the Ruel Subdivision. The derailed cars (the 21st to the 40th behind the locomotives) included a loaded tank car of liquefied petroleum gas and two tank cars loaded with a flammable liquid mixture. Benzene was the main component of the flammable mixture, while dicyclopentadiene was the second main ingredient. One of the tank cars of the benzene mixture was punctured during the derailment resulting in a fire and a total loss of product. The liquid benzene and some lumber that was strewn about the derailment site fuelled a fire that burned for several days. One of the other derailed cars was subsequently found to have a burnt-off axle journal bearing. The remote location of the accident site minimized the risks to the public. There were no injuries.
Ce rapport est également disponible en français.
TABLE OF CONTENTS
TRANSPORTATION SAFETY BOARD iii
- 0
Factual Information ................................................................................... 1 1.1 The Accident .......................................................................................................................... 1 1.2 Injuries.................................................................................................................................... 4 1.3 Dangerous Goods ................................................................................................................... 4 1.3.1 Flammable Liquid Mixture .................................................................................................... 4 1.3.2 Liquefied Petroleum Gas (LPG) ............................................................................................ 6 1.4 Damage to Equipment............................................................................................................ 6 1.5 Other Damage ........................................................................................................................ 7 1.6 Personnel Information ............................................................................................................ 8 1.7 Train Information ................................................................................................................... 8 1.8 Occurrence Site Information .................................................................................................. 8 1.9 Method of Train Control ........................................................................................................ 8 1.10 Weather .................................................................................................................................. 9 1.11 Recorded Information ............................................................................................................ 9 1.11.1 Locomotive ............................................................................................................................ 9 1.11.2 Wayside Inspection System (WIS) ........................................................................................ 9 1.12 Inspections............................................................................................................................ 10 1.12.1 Engineering Inspections ....................................................................................................... 10 1.12.2 Safety Inspection of Car CN 604697 ................................................................................... 10 1.12.3 En Route Inspections ........................................................................................................... 11 1.12.4 Other InformationCRoller Bearings and Burnt-off Journals (BOJs) .................................. 12 1.13 WIS Technology .................................................................................................................. 13 1.13.1 Background Information ...................................................................................................... 13 1.13.2 General Description ............................................................................................................. 15 1.13.3 Hot Wheel Detector (HWD) ................................................................................................ 16 1.13.4 Dragging Equipment Detector (DED) ................................................................................. 16 1.13.5 Limitations of the System Hardware ................................................................................... 17 1.13.6 Office Computer .................................................................................................................. 19 1.14 Maintainers, Technicians, and Operators ............................................................................ 21 1.14.1 Signals and Communications (S&C) Maintainers ............................................................... 21 1.14.2 S&C Technicians (Office and Field) ................................................................................... 21
TABLE OF CONTENTS
iv TRANSPORTATION SAFETY BOARD
- 14.3
TEST Car Operators ............................................................................................................ 22 1.14.4 Hot Box Operators (HBOs) ................................................................................................. 23 1.14.5 Rail Traffic Control Mechanical Service Representatives (RTC Mechs) ........................... 24 1.15 Hot Bearing Detection Task and Workload ........................................................................ 24 1.15.1 Hot Bearing Detection Task ................................................................................................ 24 1.15.2 Advance Warning Alarm (AWA) Criteria for Hot Bearing ................................................ 25 1.15.3 TP-105 Criteria .................................................................................................................... 26 1.15.4 Car-Side and Train-Side Averages ...................................................................................... 27 1.15.5 Faulty Tapes ......................................................................................................................... 28 1.15.6 Workload .............................................................................................................................. 29 1.15.7 Source of Bearings Set-off in 1999 ..................................................................................... 31 1.16 Examination of Axle Components ....................................................................................... 31 1.17 Management and Supervision .............................................................................................. 32 1.17.1 Background Information ...................................................................................................... 32 1.17.2 Responsibilities and Reporting Structure in the Edmonton WIS Office ............................. 32 1.17.3 Quality Management ............................................................................................................ 33 1.18 Regulatory Overview ........................................................................................................... 34 1.19 Observations of WISs on Some Other Canadian Railways ................................................ 37
- 0
Analysis ................................................................................................... 39 2.1 Roller Bearing ...................................................................................................................... 40 2.2 Inspections............................................................................................................................ 41 2.2.1 Electronic Monitoring .......................................................................................................... 41 2.2.2 Physical Inspections ............................................................................................................. 42 2.2.3 Tempilstik ............................................................................................................................ 43 2.3 Wayside Inspection System (WIS) ...................................................................................... 43 2.3.1 General ................................................................................................................................. 43 2.3.2 Monthly Testing ................................................................................................................... 44 2.3.3 Dynamic Testing .................................................................................................................. 44 2.4 Management/Supervision ..................................................................................................... 45 2.4.1 Roles and Responsibilities in the WIS Office ..................................................................... 45 2.4.2 Systems Knowledge ............................................................................................................. 46
TABLE OF CONTENTS
TRANSPORTATION SAFETY BOARD v
- 4.3
Workload .............................................................................................................................. 47 2.4.4 Impact of Variable Output on Workload ............................................................................. 48 2.4.5 Tape Interpretation ............................................................................................................... 49 2.4.6 Quality Management ............................................................................................................ 50 2.5 Regulatory Overview ........................................................................................................... 50
- 0
Conclusions .............................................................................................. 53 3.1 Findings as to Causes and Contributing Factors ................................................................. 53 3.2 Findings as to Risk ............................................................................................................... 53
- 0
Safety Action ........................................................................................... 57 4.1 Action Taken ........................................................................................................................ 57 4.1.1 WIS Improvements .............................................................................................................. 57 4.1.2 Regulatory Action ................................................................................................................ 58 4.2 Action Required ................................................................................................................... 58 4.3 Safety Concern ..................................................................................................................... 60
- 0
Appendices Appendix A - Examination of Tank Cars Involved in Fire ............................................................. 61 Appendix B - General Roller Bearing Information .......................................................................... 63 Appendix C - Comparison of Various Reference Manuals Relating to the WIS ............................ 65 Appendix D - Examples of Subdivisions with Passenger Train Service and HBD Spacing Exceeding 25 Miles ................................................................................................... 67 Appendix E - Observations of WIS Equipment on Other Railways ............................................... 71 Appendix F - List of Supporting Reports ........................................................................................ 75 Appendix G - Glossary ..................................................................................................................... 77
TABLE OF CONTENTS
vi TRANSPORTATION SAFETY BOARD
TABLE OF CONTENTS
TRANSPORTATION SAFETY BOARD vii
List of Figures Figure 1 - Basic Track Layout, Train Direction and Accident Location ............................................................. 1 Figure 2 - Aerial Photograph of Accident Site ..................................................................................................... 3 Figure 3 - Fire-damaged Jacket of Loaded Tank Car of LPG (CGTX 63501) .................................................... 4 Figure 4 - Damaged Benzene Tank Car (AGEX 1001) ....................................................................................... 7 Figure 5 - Simplified Sketch Showing Pull-by Inspection and WIS Locations Relative to the Accident Location ............................................................................................................................................. 11 Figure 6 - Side View of Roller Bearing and Truck Side Frame ........................................................................ 12 Figure 7 - End View of Roller Bearing and Truck Side Frame ......................................................................... 12 Figure 8 - View of End Cap from L-3 Location of Car CN 604697 ................................................................. 12 Figure 9 - View of End Cap and Remaining Portion of Axle Stub ................................................................... 12 Figure 10 - Pieces of Internal Roller Bearing Parts ............................................................................................. 12 Figure 11 - Number of Burnt-off Journals (1994-2000) on Class 1 Canadian Railways .................................... 13 Figure 12 - WIS Site Equipped with Dragging Equipment Detector and Hot Wheel Detector .......................... 14 Figure 13 - Typical CN WIS Configuration ......................................................................................................... 15 Figure 14 - Paddle Style of Dragging Equipment Detector ................................................................................. 17 Figure 15 - End View of Impactor Style of DED Showing Location of One of the Accelerometers on the Underside of the Strike Plate ........................................................................ 17 Figure 16 - Side Views of Locomotive Roller Bearing Housing ......................................................................... 19 Figure 17 - End View of Roller Bearing Housing on Railiner ............................................................................ 19 Figure 18 - Devtronics Screen Display for HBOs and RTC Mechs Showing the Location of Some of the Prompts ..................................................................................................................... 20 Figure 19 - Actual Computer Screen Displays used by HBOs and RTC Mechs ................................................. 20 Figure 20 - Typical CN TEST Train Configuration Showing a Freight Locomotive, a Highly Instrumented Box Car and a Dedicated Track Geometry Car ........................................................................................ 23 Figure 21 - CN Alarm Roller Bearing Temperature Monitoring Criteria ............................................................ 25 Figure 22 - Actual Screen Display Used by HBOs and RTC Mechs to Monitor the Status of Some of the WIS Sites .................................................................................................................. 30 Figure 23 - Desired Validation Objectives ............................................................................................................. 49 Figure 24 - Actual Validation Results .................................................................................................................. 49
FACTUAL INFORMATION
TRANSPORTATION SAFETY BOARD 1
- 0
Factual Information
- 1
The Accident
At approximately 1615 eastern standard time (EST) 1, Canadian National (CN) freight train M-304-41-05 (train 304) was proceeding eastward from Hornepayne, Ontario, to Toronto, Ontario. As the train passed by the Wayside Inspection System (WIS) site at Mile 255.1 of the Ruel Subdivision near Oba, Ontario, the WIS detected several abnormal conditions around the 95th and 96th axles on the train, including hot bearings, hot wheels and dragging equipment. The dragging equipment detector (DED) feature of the WIS had been declared out of service more than 12 hours before
- Figure 1 shows a schematic of the track in the area around Oba.
1 All times are EST (coordinated universal time minus five hours) unless otherwise indicated. 2 Three trains were stopped for dragging equipment indications, and after being inspected by the crews, no dragging equipment was found. One of the trains involved in these inspections was manned by the same crew operating train 304. Due to the apparently unreliable information coming from the DED, the DED was considered removed from service pending inspection by a qualified Signals and Communications employee.
FACTUAL INFORMATION
2 TRANSPORTATION SAFETY BOARD
The location of the detected conditions (95th and 96th axles) coincided with the trailing truck on a bulkhead flat car, CN 604697 (21st car), loaded with packaged lumber products. A radio message was transmitted directly to the train crew from the WIS site (Atalker@), verbally advising the crew of Adragging equipment,@ followed by radio messages of Amultiple alarms.@ Intermittent audible tones were also provided to the train crew indicating the detection of multiple alarms. The crew was unaware of the specific defective conditions detected by the WIS, and the audible tones provided to the crew did not differentiate between a hot box or dragging equipment problem, as both were potentially serious conditions requiring prompt attention.
The crew members proceeded to slow their train, preparing to stop and make a visual inspection. As they were slowing, they radioed the rail traffic controller (RTC) in Toronto to advise of their situation and also to make the RTC aware that they had been stopped by an alarm at the same site during their previous trip. They requested direction from the RTC as to what they should do. The RTC stated that the DED was now out of service; however, he would consult with the hot box operator (HBO) in Edmonton, Alberta, for guidance 3.
Once contacted by the RTC in Toronto, the HBO in Edmonton consulted with the rail traffic control mechanical service representative (RTC Mech), who worked in the same office, about the conditions on the tape at Oba. The RTC Mech concluded that the tape produced from the scan at Oba was Afaulty.@ 4 The RTC subsequently instructed the train to proceed. No restrictions were issued to the crew.
At approximately 1628, when the train was passing the east switch at Neswabin, at Mile 248.5, the crew members experienced a train-initiated emergency brake application. After the train stopped, the crew members heard a loud noise and saw behind them, about 20 car lengths away, a cloud of smoke blowing towards them in an easterly direction (see Figure 2). The train was carrying 20 tank cars of seven different dangerous goods intermixed through the consist. The crew members immediately made a radio broadcast to the RTC in Toronto advising of the accident. The crew members did not know what, if any, dangerous goods were involved at that time, nor the number of cars derailed, but were able to describe to the RTC the noises they heard and the smoke and fire they could observe from their location. They disconnected the two locomotives from the rest of the train and proceeded eastward to what they considered to be a safe location, at approximately Mile 239.
3 Information from CN detectors system-wide is transmitted to a central office in Edmonton, where the information is interpreted by computer systems, then reviewed by HBOs (sometimes referred to as wayside inspection operators) and rail traffic control mechanical service representatives in the rail traffic control centre. 4 AFaulty tape@ is a term used to describe an output tape when the data are considered to be unreliable. This is explained in further detail in section 1.15.5.
FACTUAL INFORMATION
TRANSPORTATION SAFETY BOARD 3
FACTUAL INFORMATION
4 TRANSPORTATION SAFETY BOARD
The RTC immediately initiated the emergency response. The emergency response was multi-disciplined, including police, fire, railway, shipper, and private contractor emergency response teams, as well as various provincial and federal regulatory agencies.
A subsequent aerial inspection of the train revealed that 20 cars had derailed: the 21st to the 40th behind the locomotives. The bulkhead flat car, CN 604697, was found to have a burnt-off axle journal (BOJ) 5, later determined to have been located at the L-3 position, which was adjacent to the lead wheel of the trailing truck on the south rail (95th axle). The derailed cars included a loaded tank car of liquefied petroleum gas (LPG) and two tank cars of benzene, a flammable liquid mixture (see section 1.3). One of the tank cars of benzene, AGEX 1001, was badly damaged resulting in a total loss of product. The liquid benzene and some lumber that was strewn about the accident site from some bulkhead flat cars that were destroyed in the accident fuelled a large fire that burned for several days. The jacket of the loaded tank car of LPG, CGTX 63501, was scorched by the heat from the fire; however, there was no release of product (see Figure 3). The emergency response procedures were carried out in a timely and effective manner.
5 ABurnt-off journal@ is a railway term commonly used to describe complete axle failure caused by an overheated bearing. More information is provided in section 1.12.4.
FACTUAL INFORMATION
TRANSPORTATION SAFETY BOARD 5
- 2
Injuries
There were no injuries as a result of this derailment.
- 3
Dangerous Goods
- 3.1
Flammable Liquid Mixture
Tank cars AGEX 1001 and PROX 41841 contained a mixture of flammable liquids with benzene being the main component. According to the shipping document, the product was shipped as Aflammable liquids, n.o.s. (benzene), Class 3, PG I, UN 1993.@ The second main ingredient was dicyclopentadiene. In addition to the two main ingredients, there were more than 10 other aromatic compounds included in the mixture.
Benzene, the main constituent of the flammable mixture, is a flammable toxic liquid whose vapours may cause a flash fire (Class 3, UN 1993). The lower explosive limit (LEL) 6 of benzene is 1.2 per cent and its upper explosive limit (UEL) is 7.8 per cent; both values are concentrations by volume of product in air. The flash point of benzene is 12 degrees Fahrenheit (F). The toxicity of benzene affects the central nervous system,
6 The lower explosive limit, sometimes referred to as the lower flammable limit, is the lowest concentration, by volume, of product that can be ignited in air by an external heat source, such as a spark or flame. The upper explosive limit is the highest concentration, by volume, that can be ignited in air.
FACTUAL INFORMATION
6 TRANSPORTATION SAFETY BOARD
respiratory system, blood and bone marrow (e.g. leukemia). The primary routes of entry are inhalation and absorption through the skin. It is a known human carcinogen with poor olfactory warning properties. The current maximum exposure limit for benzene is 0.1 part per million (ppm) as set by the National Institute for Occupational Safety and Health (NIOSH), and 0.5 ppm as set by the American Conference of Governmental Industrial Hygienists (ACGIH). The short-term exposure limit (15 minutes) is set at 1 ppm by the NIOSH and at 2.5 ppm by ACGIH. Canadian Standards Association tests show that an average person is able to detect the odour of benzene at concentrations of 4.68 ppm or higher depending on the individual and test conditions. Concentrations at these levels exceed maximum permissible limits. Vapour pressure of benzene is 75 mm at 68F.
Industrial hygienists with a private contractor monitored the site, and employees working at the site were advised when benzene levels required the wearing of specialized personal protective equipment, such as protective clothing and self-contained breathing apparatus. Ontario Ministry of Environment officials oversaw the clean-up and remediation efforts in the derailment area.
Dicyclopentadiene is a flammable, toxic solid with a camphor-like odour and a melting point of 91F. The vapour pressure of dicyclopentadiene is 1.4 mm at 68F. Because of these characteristics, it is usually transported in solution with benzene. The flammability limits are 0.8 per cent by volume LEL and 6.3 per cent by volume UEL. The flash point of dicyclopentadiene is 90F. It is quite reactive and can polymerize (undergo a chemical reaction where molecules combine) explosively as well as depolymerize. It is considered moderately toxic by inhalation and mildly toxic by skin contact. Maximum exposure limit is set at 5 ppm by both the ACGIH and the NIOSH. The organs affected by exposure to dicyclopentadiene are the kidneys, central nervous system, and respiratory system. In the United States, it is part of the Genetic Toxicology Program, administered by the Environmental Protection Agency (EPA), which is evaluating its links to genetic mutations and other detrimental genetic effects.
FACTUAL INFORMATION
TRANSPORTATION SAFETY BOARD 7
- 3.2
Liquefied Petroleum Gas (LPG)
Propane, as transported in tank cars, is a flammable colourless liquefied gas (i.e. shipped under pressure). Its flammability limits are 2.4 per cent by volume LEL and 9.5 per cent by volume UEL. The flash point of propane is minus 156F. The permissible exposure limit is 1,000 ppm. It is a highly dangerous fire hazard when exposed to a source of ignition, or if the tank is subjected to heat or flame. Propane can react vigorously or explosively with any oxidizer. It is toxic to the central nervous system at high concentrations, and can also act as an asphyxiant.
- 4
Damage to Equipment
Sixteen of the twenty derailed cars from train 304 were destroyed, including three tank cars that were involved in the post-derailment fire. Four cars experienced minor damage and were repaired and returned to service.
The car with the BOJ, CN 604697, was slightly damaged. The car was examined after the accident. No signs of roller bearing grease were noted on the truck and underframe area of the car immediately above the roller bearing where the BOJ was located (the L-3 position).
The tank cars of benzene, AGEX 1001 and PROX 41841, were built to specification DOT-111A100W1. Car AGEX 1001 was badly damaged during the derailment sequence and lost its entire contents (see Figure 4). The susceptibility of minimum standard Class 111A cars to experience damage during a derailment has been known throughout the North American railway industry, including railway safety regulators, for a considerable time.
FACTUAL INFORMATION
8 TRANSPORTATION SAFETY BOARD
The tank car of LPG, CGTX 63501, was built to specification DOT-112J340W. The tank car was heavily damaged but experienced no loss of product.
TSB personnel examined three of the more seriously damaged tank cars and the detailed results of this examination are contained in Appendix A.
- 5
Other Damage
The first marks on the railway ties were noted approximately 200 feet before the WIS at Mile 255.1. The derailed wheel set of car CN 604697 caused minor damage to 6.75 miles of track. There was substantial damage to the hot box detector (HBD) at Mile 255.1, and to the west power switch to the Neswabin Siding, at Mile 249.8. The east power switch and dwarf signal at Neswabin, Mile 248.5, and 500 feet of track immediately east of the east power switch were destroyed. In the main derailment area, a total of four telephone poles and all associated hardware were destroyed. Total property damage exceeded $1.5 million.
FACTUAL INFORMATION
TRANSPORTATION SAFETY BOARD 9
- 6
Personnel Information
The operating crew consisted of a locomotive engineer, a conductor and an assistant conductor. They were qualified for their respective positions and met fitness and rest standards.
- 7
Train Information
Train 304 consisted of 2 locomotives and 71 cars: 57 loads, 13 empties and 1 residue. The train was carrying a variety of dangerous goods as follows:
$ 1 load of LPG, Class 2.1, UN 1075 $ 10 loads of vinyl chloride, Class 2.1, UN 1086 $ 2 loads of benzene/dicyclopentadiene, Class 3, UN 1993 $ 3 loads of anhydrous ammonia, Class 2.4, UN 1005 $ 2 loads of methanol, Class 3, UN 1230 $ 1 load of ethylene glycol, Class 9, NA 3082 $ 1 residue of N-dimethylformamide, Class 3, UN 2265
The train was approximately 4,850 feet in length and weighed about 7,000 tons.
- 8
Occurrence Site Information
The subdivision was single main track in the derailment area, and handled both passenger and freight traffic. The track structure consisted of 136-pound continuous welded rail (CWR) rolled in 1992 and laid in 1993. The ties were No. 1 hardwood. The rail was secured with six spikes per tie on 14-inch double-shouldered tie plates, anchored every second tie with improved Fair anchors. The ballast consisted of slag on a full crib and was in good condition. The roadbed was elevated approximately 10 to 15 feet above the surrounding ground level.
The authorized time table speeds between Mile 245.5 and Mile 252.2 on the Ruel Subdivision were 55 mph for passenger trains and 45 mph for freight trains.
- 9
Method of Train Control
Train operations from Mile 1.6 to Mile 295.6 on the Ruel Subdivision were controlled by the Centralized Traffic Control System authorized by the Canadian Rail Operating Rules (CROR) and supervised by an RTC located in Toronto.
FACTUAL INFORMATION
10 TRANSPORTATION SAFETY BOARD
- 10
Weather
The temperature at the time of derailment was approximately minus 10 degrees Celsius, and wind was from the north-west at approximately 15 km/h. Precipitation was nil; however, there were blowing snow conditions around passing trains due to recent snow accumulations.
- 11
Recorded Information
- 11.1
Locomotive
The event recorder transcript indicated that the emergency brake application occurred at 1628:28. At that time, the train speed was 42 mph, with the throttle in the No. 8 position. At 1629:16, the train speed was registered as 0 mph.
- 11.2
Wayside Inspection System (WIS)
A review of recorded data from WIS sites located at Mile 282.3, Mile 268.7, and Mile 255.1 of the Ruel Subdivision revealed the following:
$ No abnormal roller bearing temperatures or dragging equipment were detected as the train passed the site at Shekak, Mile 282.3.
$ The WIS at MacDuff, Mile 268.7, generated a warm bearing indication in Edmonton for the 95th axle due to the differential of temperatures between the north and south rail bearings. The reading on the scanner printout for the north rail was 1.8 mm (a Apedestal pulse@ 7) and the reading on the south rail was 8.2 mm, a differential of 6.4 mm between the north rail and south rail. CN system procedures require train crews to be advised of an overheating bearing once the differential exceeds 8 mm 8.
7 Section 1.13.2 describes how the heat energy is converted to an electrical output which is displayed in graph form measured in millimetres. APedestal pulses@ are deflections of 1.8 mm and are the minimum readings that a CN scanner will record. Regardless of the amount of heat picked up during the scanning of a journal bearing, the office equipment is designed to add 1.6 mm of deflection to the reading. The field hardware adds another 0.2 mm, totalling 1.8 mm, to every journal bearing scan. This ensures that every axle is easily identified for axle count purposes. 8 Any differential where the heat on one rail is greater than 6 mm from the heat on the other is designed to generate a yellow warning indication at the monitors for the HBOs and RTC Mechs in Edmonton. A differential greater than 8 mm is designed to generate a red alarm condition requiring the train to be stopped immediately and inspected by the train crew. $ As noted previously (section 1.1), the talker device of the WIS at Oba, Mile 255.1, communicated a number of alarms, including hot bearings, hot wheels and dragging equipment. It did not convey
FACTUAL INFORMATION
TRANSPORTATION SAFETY BOARD 11
any information to the train crew that the WIS had been rendered inoperative, or damaged, by the passing train.
- 12
Inspections
- 12.1
Engineering Inspections
A rail TEST car (Pandrol Jackson) last tested the Ruel Subdivision on 15 and 16 January 1999, and no defects that required immediate attention were noted in the area of the derailment. In May 1998, maintenance-of-way extra gangs completed a tie-replacement program between Mile 268 and Mile 295.6. The track was last inspected by a track supervisor on 04 February 1999, and no irregularities were noted. The local snow protection track maintenance foreman and a signal maintainer passed over the track in a Hi-rail vehicle between 1000 and 1400 on the day of the accident, and again no exceptions were noted.
- 12.2
Safety Inspection of Car CN 604697
Car CN 604697, carrying a load of lumber, originated in northern British Columbia and was destined to a customer in the eastern United States. The repair record shows that the No. 3 wheel set (the third axle from the B-end of the car) was last replaced in 1995 at a U.S. repair location. The car had travelled 132,000 miles since the wheel set was replaced. The load of lumber that it was carrying was distributed evenly over the length of the car.
Before the eastward departure of the car from CN=s Prince George Yard, the car had received an initial safety inspection 9 by a certified car inspector, and no defects were noted. Car CN 604697 had previously been on a train that was involved in a collision on 31 January 1999, in Jasper, Alberta. Nine of the head-end cars at Jasper either derailed or showed signs of being subjected to severe compressive loads. Car CN 604697 was located in the 30th position in that consist and did not derail. The car was inspected by certified car inspectors at the site after the accident
- With no obvious signs of derailment damage nor signs of being subjected to severe
compressive loads, the car was determined to be fit to return to service. Subsequent to this derailment, repair records for the first 25 non-derailed cars from the Jasper collision were reviewed to see if any of the wheel sets had experienced premature roller bearing failure, and none had.
9 During a safety inspection, only the exterior visible components of a roller bearing are assessed. 10 The wheel sets were not removed in order to check the roller bearings, nor was there any industry requirement to do so. Subsequent safety inspections of car CN 604697 were conducted en route at Edmonton and Winnipeg; again, no defects were noted. Weigh scales in Winnipeg Yard recorded the total weight of the car and it was found to be within allowable limits.
- 12.3
En Route Inspections
FACTUAL INFORMATION
12 TRANSPORTATION SAFETY BOARD
Before the WIS at Oba, the train had passed over two WIS sites (Shekak, Mile 282.3, and MacDuff, Mile 268.7), and no alarms were communicated to the crew by the advance warning alarm (AWA) system (the talker) at either of these two sites. However, the display screen at Edmonton was showing a warm bearing (yellow) indication at Mile 268.7 to the HBO.
Between the initial terminal of Hornepayne and the point of derailment, a distance of approximately 41 miles, train 304 had been inspected by the crew members of three other trains that were passed at the three sidings preceding the point of derailment (see Figure 5). Train 304 was inspected on the north side only at these three locations. Due to heavy snow conditions, there were few safe areas for employees to position themselves to inspect a passing train on the south side. No defects were noted during these inspections.
FACTUAL INFORMATION
TRANSPORTATION SAFETY BOARD 13
- 12.4
Other InformationCRoller Bearings and Burnt-off Journals (BOJs)
Roller bearings are pressed onto the ends of railway axles adjacent to the wheel plate area. There are typically eight roller bearings per car, one on each end of the four axles. Roller bearings are normally of a tapered design, and support and transfer the weight of the rail car and its contents onto the axles and through the wheels to the rails. The bearing is positioned within a pedestal jaw of a truck side frame. The moving parts of the roller bearing allow the solid wheel/axle combination to which it is attached to rotate with little friction (see Figures 6 and 7). General roller bearing information can be found in Appendix B.
Overheated roller bearings occur when inadequate lubrication or mechanical flaws result in an increase in bearing friction. This phenomenon is called a Ahot box@ in railway jargon. The bearing temperature can continue to rise and lead to complete failure of the axle, commonly referred to as a Aburnt-off journal@ (see Figures 8, 9, and 10).
A BOJ normally results in the derailment of the car on which it occurs. Should axle failure happen while the train is proceeding at a high speed, the derailment frequently results in multiple cars derailed and/or damaged. Figure 11 shows the total number of BOJs since 1994 provided to the TSB during the investigation by the three Class 1 Canadian railways.
FACTUAL INFORMATION
14 TRANSPORTATION SAFETY BOARD
A hot box condition on roller bearing-equipped rail cars can elevate quickly and become a BOJ within a few miles. A review of 47 derailments following a BOJ that happened between 1992 and 1996 showed that 22 of the derailments occurred within five miles after passing an operative HBD without an alarm condition
- The
HBD spacing on some core routes is 25 to 30 miles, as that was a common distance that the now prohibited plain bearing could travel if it overheated without resulting in a BOJ. Advancements in roller bearing technology have led to the replacement of plain bearings on all interchange rail cars.
- 13
WIS Technology
11 Based on a sampling of 47 BOJs between 1992 and 1996, the average distance beyond an operative HBD at which an axle completely failed was 11.5 miles (the median was 8 miles, and 22 failed within 5 miles).
FACTUAL INFORMATION
TRANSPORTATION SAFETY BOARD 15
- 13.1
Background Information
Over the last 25 to 30 years, many North American railways have implemented large numbers of HBDs and DEDs as an integral part of their railway infrastructure. This technology assisted railway personnel in the identification of operating problems that posed a risk to safe train operations.
Subsequent to the 1979 Mississauga train derailment, Agateway@ locations were identified entering densely populated areas. Before entering such areas, trains carrying dangerous goods were required to be inspected. Within these areas, trains were subject to certain operating restrictions to enhance the safety of their operations. Railways could satisfy the inspection requirement if the train had a successful inspection by a hot box and dragging equipment detector. Without such technology, other measures had to be taken, such as having the trains stop and be inspected by the train crews or by other railway employees.
Later, some HBDs were further enhanced with the addition of hot wheel detectors (HWDs) and significant improvements to the hardware; e.g., analog to digital, improved infrared scanner technology and, more recently, sophisticated computer hardware. As user confidence grew with the technology and the railways realized improved safety to their operations, more and more HBDs, HWDs, and DEDs were added to their fixed infrastructure and the sites became known as Wayside Inspection Systems (WISs).
FACTUAL INFORMATION
16 TRANSPORTATION SAFETY BOARD
CN=s WIS of today is a distributed system comprising sensors in the field, coupled with office computers (located in Edmonton, Toronto, and Montréal) and a network of personnel from various departments within CN (Signals and Communications, Mechanical, and Operations) who perform functions from testing to reading and interpreting the WIS data. 1.13.2 General Description
The HBD senses radiant infrared heat energy emitted from the bearing as it passes the detector. The heat energy is converted to an electrical output proportional to the amount of heat and relative to the ambient temperature. Ambient temperature is determined by scanning the bottoms of the rail cars as they pass. The electrical output is fed to a data processing unit (DPU) in an adjacent bungalow, which is a structure that encloses various electrical and electronic equipment necessary to operate the railway system. When the train has passed the site, all the data are sent to the office for interpretation, with hot wheel and dragging equipment indications flagged in the data. All data are sent in as raw Auninterpreted@ data for office analysis at warm and hot levels. If the amount of energy sensed by the HBD exceeds preset values, then the appropriate indication is generated. Such an indication is immediately relayed to the HBO (where it is displayed in graph form measured in millimetres) and to the train crew by the AWA through a radio (Atalker@) system (see Figure 13).
FACTUAL INFORMATION
TRANSPORTATION SAFETY BOARD 17
Today, HBDs are strategically placed throughout the core network of most major railways. The principal target of the detectors is freight car bearings (which comprise about 97 per cent of all axles). CN has 68 subdivisions protected by HBDs, representing over 97.9 per cent of CN=s traffic. Of the remaining 48 subdivisions, 11 are under 20 miles in length and account for 0.4 per cent of traffic. The remaining 37 subdivisions which are not equipped with HBDs carry 1.7 per cent of CN=s traffic. Typical spacings of HBDs on main corridor routes of both CN and Canadian Pacific Railway (CPR) seldom exceed 30 miles. After a five-year major capital program west of Capreol, the spacings in many areas on CN core routes were reduced to 12 to 15 miles. Locations where the risks were low, such as subdivisions with low gross ton-miles or no
FACTUAL INFORMATION
18 TRANSPORTATION SAFETY BOARD
dangerous goods traffic, were frequently not targeted for the installation of HBDs. CN continues to invest in additional HBDs to progressively reduce spacing distance on core mainlines and achieve further improvements in roller bearing performance.
- 13.3
Hot Wheel Detector (HWD)
The HWD is similar to the HBD in that it senses radiant heat energy. However, the target in this instance is the wheel plate area near the tread, approximately 2 1/2 inches above the rail. CN=s HWDs include an AM@-shape filter which eliminates elevated wheel tread readings due to momentary application of train brakes. Some systems use an HWD scanner on both sides of the track, but most use only one scanner on one side of the track. When only one HWD scanner is used to scan wheels on both the near and far rail, it is normally set at an angle to the track. The outboard wheel plate surface of a wheel on the near rail can be scanned, as can the inboard wheel plate surface of a wheel on the far rail. A reference temperature is established by placing a white board on the far side of the track opposite the HWD scanner. The reference board is used as a base value in order to produce semi-absolute wheel plate temperature readings. The data are transmitted to the DPU in the bungalow and compared to preset alarm thresholds. As with the HBD, alarms are relayed to the HBO and to the train crew by the AWA through the Atalker@ system.
- 13.4
Dragging Equipment Detector (DED)
The DEDs were of two different designs; paddle (mechanical) or impactor (electronic) style. The paddle style (see Figure 14) consisted of strike plates, both inboard and outboard of the rails, attached to a shaft with a cam-operated switch and a return spring. An object striking the paddles in either direction would rotate the shaft, momentarily opening the switch contacts. An open circuit would trigger an alarm. The impactor style (see Figure 15) was designed to alleviate the problems associated with the paddle style under deep snow conditions and has no moving parts. Stationary strike plates between and outboard of the rails are fitted with accelerometers which detect impact energy. Sufficient impact energy creates an electrical output recognized by the DPU and generates an alarm. DED alarms are always relayed to the train crew by the Atalker@ system, and to the HBO by modem.
FACTUAL INFORMATION
TRANSPORTATION SAFETY BOARD 19
- 13.5
Limitations of the System Hardware
The HBDs are rated to work in ambient temperatures ranging from minus 40F to plus 160F. Rated speeds are up to 120 mph. Severe environmental conditions, such as snow storms and blowing snow conditions, heavy rain and ice, can affect the quality of the scan data. The type of housing used for the roller bearings within the truck assembly can have an impact on the ability of the scanners to sense infrared heat energy. Although most freight cars are equipped with standard freight car trucks which are easily scanned, equipment with unusual, heavy, or complicated truck assemblies (e.g. locomotives, specially equipped freight cars and passenger cars) can interfere with the radiant heat being sensed by the HBD scanners. Some passenger cars (e.g. Light, Rapid, Comfortable (LRC) coaches) have no external bearings and are therefore equipped with an on-board heat detection system. The on-board system continually monitors the condition of the internal roller bearings which are not scanned by conventional HBD scanners.
FACTUAL INFORMATION
20 TRANSPORTATION SAFETY BOARD
The following VIA Rail Canada Inc. (VIA) equipment has wheel bearings external to the wheels:
Equipment
Number of Cars/Locomotives
HEP I cars (head-end electrical power stainless steel Budd cars, transcontinental service
180 cars
HEP II cars (stainless steel Budd cars, corridor service)
33 cars
F40 locomotives (GM, corridor and transcontinental service)
58 locomotives
GPA-418 locomotives (GM, other serviceCNorthern Quebec and Manitoba)
7 locomotives
MPA-27 locomotives (Bombardier, LRC corridor service)
7 locomotives
The current maximum rated speeds of each type of equipment is:
Type of Equipment
Maximum Rated Speeds
HEP I cars
90 mph
HEP II cars
95 mph
LRC cars
100 mph
F40 locomotives
95 mph
GPA-418 locomotives
89 mph
MPA-27 locomotives
100 mph
Only the LRC car fleet (98 cars) has inboard bearings and all these cars are equipped with on-board monitoring equipment. A few VIA locomotives 12 have on-board journal bearing heat monitoring. CN and CPR locomotives are not normally equipped with this type of on-board electronic monitoring. Locomotives without an on-board journal bearing heat detection device rely on the WIS to detect journal bearings that are in a state of distress.
12 Nearly half of VIA=s locomotive fleet was at one time equipped with journal bearing heat sensors. However, subsequent to an accident in Biggar, Saskatchewan, in 1997, the sensors for the exterior journal bearings were deemed to be problematic and removed. Only the seven Bombardier locomotives (MPA-27) rated for 100 mph continue to have operative journal bearing sensors. All VIA locomotives are now equipped with on-board monitoring of traction motor suspension bearings.
FACTUAL INFORMATION
TRANSPORTATION SAFETY BOARD 21
Both Southern Technologies Corporation (STC) 13 and Harmon Industries 14, the two major suppliers of HBDs in North America, stated that, even in favourable environmental conditions, some bearings on locomotives cannot be accurately scanned. The HBD functions as intended; however, there are mechanical parts located between the bearing and the scanner which can obscure the view of the bearing as it passes the HBD (see Figures 16 and 17). These mechanical parts differ by axle size and by locomotive type. Locomotives represent a small percentage of all axles scanned; however, unlike freight equipment, many locomotives are manned.
Figure 16 - Side views of locomotive roller bearing housing (Note: bottom tie strap under bearing)
- 13.6
Office Computer
Data from the DPU in the track side bungalow are received at a central office computer where they are processed by computer software (Devtronics). The Devtronics software is also used by the operator to view the information in the form of an Aanalog@ chart displayed on a video display. If the WIS values are within normal operating parameters, the operator is not actively notified of the train inspection, though the information is displayed on the operator=s screen in the form of a green message line in a status window. If the values meet TP-105 criteria 15 or other criteria defined in the computer software (e.g. car-side average or train-side average which are further explained in section 1.15.4), then the data are presented to the operator in the form of an analog tape displayed on the computer screen. If there is more than one tape to be examined, the first is displayed and all others are placed into a queue and a visible alarm and an audible alarm are generated to alert the operator (see Figure 18).
13 STC is the supplier of Sentry equipment. 14 Harmon Industries is the supplier of Servo equipment. 15 CN developed an operating manual titled Hot Wheel, Hot Box & Dragging Equipment Systems, Operating Guidelines commonly referred to as TP-105.
FACTUAL INFORMATION
22 TRANSPORTATION SAFETY BOARD
A train is not normally displayed on the screen in its entirety (e.g. typically 35 cars to a display screen) because of the size of the analog tape. In order to view the complete tape, the HBO must scroll from one direction to another (see Figure 19). When the Ahigh@ reading is identified, the operator can obtain more detailed information by clicking on the relevant portion of the tape. Once the tape is examined, the operator has a choice of either acknowledging having viewed and interpreted the tape or placing the tape back into the queue for later reference.
FACTUAL INFORMATION
TRANSPORTATION SAFETY BOARD 23
Figure 19 - Actual computer screen displays used by HBOs and RTC Mechs (Note electronic version of analog tape displayed on the bottom of the screen on the right)
FACTUAL INFORMATION
24 TRANSPORTATION SAFETY BOARD
- 14
Maintainers, Technicians, and Operators
- 14.1
Signals and Communications (S&C) Maintainers
Signals and Communications (S&C) maintainers report to a signal supervisor within the S&C Department. They are responsible for performing monthly tests on the WIS sites. A device supplied by the manufacturer for this purpose known as the function simulator is used to simulate an overheating bearing. The temperature setting used in the test procedure is 135F above the ambient temperature. The WIS system alarm threshold temperature setting is 180F above ambient. Interviews with S&C maintainers revealed that training associated with the testing of WIS sites consisted basically of on-the-job training through observing others doing the monthly tests.
The S&C maintainers also respond to trouble calls as required. At the time of the occurrence, they did not have an easy way in the field to identify problems with the various components of the WIS, particularly the DED, and repairs of a highly technical nature frequently required the assistance of technicians. Numerous sites in the northern areas were only accessible by Hi-rail vehicle. This restriction affected the amount of time that a site would be out of service compared to sites in urban areas where access was usually easier (e.g. road).
The primary goal of an S&C employee when responding to trouble calls involving the WIS was to restore it to correct operating condition. The main complaint presented to S&C maintainers from the operating employees (train crews, RTCs, etc.) was that the WIS was stopping trains unnecessarily (false alarms); therefore, one of their routine tasks was to make the WIS stop sending alarm messages when there was no defect. To ensure the field repairs corrected the problem with a WIS, an informal practice had evolved of allowing four trains (which provided normal indications on previous sites) to go over a site without generating alarms before certifying the site as repaired.
- 14.2
S&C Technicians (Office and Field)
The S&C technicians who worked in the offices associated with the WIS were located in Montréal, Toronto and Edmonton in the rail traffic control centres. However, they reported directly to a signal supervisor within the S&C Department.
With respect to the WIS, the primary role of the S&C office technicians was to read and interpret test tapes generated by S&C maintainers in the field, record trouble calls associated with the WIS sites, dispatch personnel to ensure proper operation of the sites, and read and interpret test tapes generated by the CN TEST car. Some of the office technicians indicated that they had no formal training on interpreting test tapes, other than the information provided in manuals, and from observing others doing the job.
The S&C technicians who worked in the field inspecting and maintaining the WIS field sites were normally based at radio shops or field offices located strategically along the right-of-way throughout the CN system. There were fewer technicians than signal maintainers. A signal technician would typically cover the territory of several maintainers. S&C technicians performed more in-depth technical work due to their more extensive
FACTUAL INFORMATION
TRANSPORTATION SAFETY BOARD 25
technical training and were usually called out in cases where S&C maintainers needed more detailed technical assistance. S&C technicians worked under the auspices of a signal supervisor located in the field.
- 14.3
TEST Car Operators
CN currently has two dedicated track geometry cars (TEST cars) for the purposes of measuring track conditions. Both TEST cars are accompanied by an operator who ensures the on-board computerized track geometry equipment is functioning as designed. Only one of these TEST cars is capable of dynamically testing the HBDs. This car last travelled over the major corridor routes in eastern Canada, including the Ruel Subdivision, in September 1995. CN did experiment with equipping one of its TEST cars with hot wheel simulators but the modification was unsuccessful because of problems related to track clearance, and the technology was removed due to repetitive damage in service. Neither TEST car had been equipped to test DEDs.
No other Canadian railway is known to have a car capable of dynamically testing any aspect of WIS sites.
A TEST car is coupled to a highly instrumented box car and then pulled by a freight locomotive (see Figure 20); therefore, the maximum operating speed of the TEST train is limited to subdivision zone speed for freight trains (typically 60 mph), any temporary or permanent slow orders, or other restrictions that may be in effect (e.g. on a General Bulletin Order).
Maximum passenger train speeds on CN subdivisions are typically 70 or 80 mph, but can be up to 100 mph on corridor service routes for LRC passenger trains (Québec to Windsor). The maximum permissible speed for freight trains is typically 60 mph, but 65 mph is allowed for designated trains (e.g. high-speed intermodal). CN states that, since the principal target of the WIS system is freight car bearings (which comprise about 97 per cent of all axles) and since eastern corridor passenger cars (comprising many of VIA=s high-speed passenger car-miles) are equipped with inside bearings and on-board sensors, the TEST car process is matched to the statistical need.
The computer on board the TEST car will see a slow down of data processing if operated at a speed of 65 mph for extended periods of time. The data are not lost, only delayed due to the time required for processing.
FACTUAL INFORMATION
26 TRANSPORTATION SAFETY BOARD
- 14.4
Hot Box Operators (HBOs)
The HBOs are unionized employees who report to the Operations Group and come under the auspices of the Edmonton rail traffic control centre manager. The primary goal of the HBO is to examine WIS tapes to identify dragging equipment and possible hot boxes and to detect conditions which may indicate a malfunctioning detector. Before the introduction of the RTC Mech, the HBO also stopped trains in response to alarms for hot wheel conditions.
Training for HBOs consists of one day of classroom instruction, including an examination, followed by a minimum of four days of on-the-job training with a more experienced HBO. The on-the-job training can be extended as required at the supervisor=s discretion. Refresher training may also be given to employees who are trained, but have not worked in the position for six months. After not working in the position for 12 months, an employee must undergo refresher training. Refresher training may consist of one or more of the following: Asitting-in@ for a number of assignments with an experienced HBO, classroom instruction, and an examination.
FACTUAL INFORMATION
TRANSPORTATION SAFETY BOARD 27
Company policy states that, when new, revised or supplementary instructions are introduced (depending on the extent of the changes), refresher training may be deemed necessary for all employees affected. With respect to the Devtronics software, the HBOs were provided with instructions on its use, and were allowed a transition period of several months where both the new computer system and the older CN office computer were operated side by side. The HBOs were also given the opportunity to provide design recommendations based on their experience during this phase-in period.
- 14.5
Rail Traffic Control Mechanical Service Representatives (RTC Mechs)
The RTC Mechs are management level positions reporting to the Director of Mechanical Services, West. They are formally trained to work within the operating guidelines of TP-105. The remainder of their tape reading and interpretation skills have been derived experientially.
The RTC Mech positions were established in response to a study group which examined AWhy Wheels Fail.@ As part of this study, it was determined that proactive monitoring and action might prevent wheel failures associated with sticking brakes. When the RTC Mechs were first established as a group, this was accomplished by taking action based on the monitoring of HWD data. As the RTC Mechs became experienced at interpreting the hot wheel data, they began to expand their role and became more involved with hot bearing data. Through this experiential learning process, involving the examination of both hot wheel and hot bearing tapes in unison, they developed strategies to better discern whether the data indicated a hot wheel due to a sticking brake, or a hot bearing due to a failing journal.
In addition to these duties, the RTC Mechs attempted to reduce unnecessary on-line train stops.
- 15
Hot Bearing Detection Task and Workload
- 15.1
Hot Bearing Detection Task
Different criteria are used to identify different levels of bearing state and associated alarm conditions. The following table (see Figure 21) and sections describe in more detail the different alarm settings and associated criteria for the varying equipment and systems monitored by the WIS. 16
16 Note: the criteria monitored by the WIS are different from the criteria contained in TP-105. A comparison of the two can be found in Appendix C.
FACTUAL INFORMATION
28 TRANSPORTATION SAFETY BOARD
Bearing State
Criteria
Absolute Deflection
(mm)
Differential
(mm)
Advance warning alarm (AWA)
17
10
Hot bearing (HB and HD)
15
8
Warm bearing (WB and WD)
12
6
Warm bearing (W2) double slope pulse to train-side average
based on a comparison of each pulse on a particular side of a train with the average of ALL pulses on that side of the train
Warm bearing (W3) double slope pulse to car-side average
based on a ratio of the highest pulse recorded on each side of every individual car to the average remaining pulses on that side of the car
Figure 21 - CN alarm roller bearing temperature monitoring criteria
- 15.2
Advance Warning Alarm (AWA) Criteria for Hot Bearing
The AWA was designed to alert a train crew should an alarm condition, such as a hot bearing, a hot wheel, or dragging equipment, be detected. For hot bearings, if HBD criteria met or exceeded 17 mm absolute deflection or 10 mm differential from one side of the axle to the other, the WIS immediately initiated a double audible tone followed by a message(s) on the designated end-to-end radio standby channel (advising the crew of an alarm condition, identifying the axle number and side of the train). If other hot bearing or dragging equipment defects were detected on the same train, double tones would be broadcast as the defects were encountered, and the final message after the train had completely passed the WIS would indicate A. . . multiple alarms, repeat, multiple alarms. . . .@ The Devtronics system would also report AWAs to the Edmonton HBO/RTC Mech office. Once the train passed the WIS site, a tape could then be interpreted (normally by the HBO), and the location of the hot bearing would be passed onto the train crew members who then physically inspected the stopped train.
CN General Operating Instructions (GOIs) required that Athe train . . . must stop immediately, consistent with good train handling practices advising the RTC the location where the engine came to a stop.@ The crew member performing the inspection would proceed to the identified car and inspect all journals. If all journals appeared to be normal, inspection had to be made of all journals on at least three cars ahead and behind the identified car. The crew member was required to use a temperature-indicating crayon (Atempilstik@) to aid in determining if the bearing was dangerously overheated. 17 Melting of the tempilstik was intended to indicate that the car had to be Aset off@ for repairs.
17 A tempilstik leaves a wax-like shiny smear when applied to a journal whose temperature exceeds the melting point of the tempilstik (a tempilstik that melts at 200F conforming to the Association of American Railroads requirements is used for CN freight equipment).
FACTUAL INFORMATION
TRANSPORTATION SAFETY BOARD 29
In addition to the use of a tempilstik on a suspect journal, a visual inspection was required to determine if there were any other defects present. A review of data pertaining to CN train stops from 1995 to 1999 revealed that, between 30 and 40 per cent of the time, train crew members could not find a defect when instructed to stop and inspect a particular car.
Rule 36 E.1. of the Association of American Railroads (AAR) Field Manual of the A.A.R. Interchange Rules states ATo check bearing for overheated condition, use of a temperature indicating crayon (200 degrees F) or other temperature measurement device on outside of cup is required.@ Use of a tempilstik provided both confirmation that the bearing was hot, and that it was physically inspected at the time the car was set off.
- 15.3
TP-105 Criteria
CN=s use of TP-105 criteria predates its use of AWAs using a talker system. It also distinguishes CN as one of the few railways in North America that attempts to use operator judgement to supplement the use of technological equipment. TP-105 criteria incorporate a more restrictive threshold than that used by the AWA system. Operators use these more restrictive criteria to help them identify bearings as potentially being in the early signs of distress. TP-105 criteria include provisions for the early detection of bearings for the following conditions, each of which is further explained later in this section:
$ hot bearing absolute deflection $ hot bearing differential $ warm bearing absolute deflection $ warm bearing differential
When a scanned bearing met TP-105 criteria for a hot bearing (15 mm absolute deflection or 8 mm differential), the HBO was presented with an electronic tape, and a red message was placed on a status window on a computer monitor at the HBO workstation. The WIS would not broadcast a message in the field unless the AWA criteria (which were higher) had been exceeded. It was up to the HBO to examine the tape and confirm if TP-105 criteria had been exceeded. If they were, then the HBO was required to contact the train crew through the appropriate RTC and stop the train, providing the crew members with the location of the potentially hot bearing on their train for inspection. In the event that a warm bearing was detected (based on TP-105 criteria of 12 mm absolute deflection or 6 mm differential), then the operator was again presented with a tape, and a yellow message was displayed in the status window. When a warm bearing was detected, the HBO was expected to make a comparison of this tape with the tape of the same train obtained at the previous detector site. The HBO was then expected to pay close attention to the suspected car, as it moved over subsequent detectors, to determine if the bearing was overheating, maintaining its temperature, or cooling down.
As per system design, no information about the warm bearing alarms was normally conveyed to the train crews or the RTCs.
FACTUAL INFORMATION
30 TRANSPORTATION SAFETY BOARD
Examining the tape of a train from a previous site involved determining the direction of the train, the number of axles on the train (to help in identifying the train at the previous site), and the axle number which was heating up. With this information and a knowledge of train routings and track layout, the operator could then determine the location where the train was last inspected by a WIS. To determine the last site where a train was inspected required performing a few functions using the Devtronics software (searching through a few Awindow@-type computer screen displays). A window showing the previous site was opened and the status screen for the site was examined to locate a train with a similar number of axles, having very recently gone over the site. The tape for this train could then be called up and examined.
The method used to monitor a train as it moved over subsequent detectors was much the same. It involved manually identifying the direction of the train, and then opening up a window which allowed selection of the following site. The system was then configured to display the tapes of all trains passing over this site, regardless of the temperatures detected by the sensors. It was up to the HBO to determine which tape was associated with the suspect bearing. There was no special message brought to the HBO=s attention signifying that the subsequent site was flagged at Aoperator request@ as opposed to a tape generated during regular operations. A test performed during the investigation revealed that an HBO could flag the wrong subsequent scanner in an area where trains diverge from one subdivision to another. This was particularly true if the HBO was not intimately familiar with the track layout and train routing practices in a specific area.
- 15.4
Car-Side and Train-Side Averages
The Devtronics software also identified two other types of potentially warm bearings; those based on a car-side average, and those based on a train-side average. These were displayed to the operator in the same manner as the warm bearings, identified on the basis of absolute deflection (WB) or differential (WD). The only distinguishing feature was that they were labelled W2 and W3 on the status screen as opposed to WB or WD. When a warm bearing was detected, it was categorized into one of the four types, depending on severity, with the following priority; WB, WD, W2 and W3 (highest to lowest). Some HBOs and RTC Mechs did not differentiate the W2 or W3 indications from the WB or WD indications. W2 or W3 data represent special circumstances where an axle may be starting to overheat, but does not meet the strict 12 mm absolute deflection for WB or 6 mm differential criteria for WD. Several HBOs explained that they would examine W2 and W3 tapes looking for values that exceeded the 12 mm absolute deflection or the 6 mm differential. Such employees were therefore spending time examining W2 and W3 tapes looking for values that, by definition, would only be present in WB or WD indications.
- 15.5
Faulty Tapes
The HBOs and RTC Mechs also examined tapes in order to identify indications of a malfunctioning detector. Based upon their instruction, HBOs and RTC Mechs looked for the following anomalies to identify malfunctioning detectors:
$ loss of heat readings or no heat on one or both rails (graphic sample tapes were included in TP-105) $ absence of normal roller bearing indications on trains known to have this equipment
FACTUAL INFORMATION
TRANSPORTATION SAFETY BOARD 31
$ erratic traces such as noise spikes and weather disturbances $ wave patterns (i.e. voltage variations) $ very high readings due to a miscalibrated scanner $ when one or more bad frames (i.e. missing or corrupt data) remain on the electronic tape after an attempt to retransmit the data from the site $ when one of the following alarms is presented ACHK TRN LENG@ or ADO AN RXT . . .@ ATOO LONG TRN@ 18
Specifically relating to this occurrence, when the train went over the MacDuff WIS, a warm bearing differential (WD) alarm for the 95th axle was generated. The HBO did not examine the previous site the train had passed over, nor did he flag the next site (Oba) so that a comparison could be made between the two readings to determine if the bearing was becoming progressively warmer. When the train passed over the WIS at Oba, it generated an electronic tape which depicted a multiple alarm tape, including hot wheel, dragging equipment, and hot bearing at or near the 95th axle. There were also pedestal pulse readings (which can indicate the absence of heat readings) on the north rail subsequent to the 95th axle and anomalous spikes on the south rail.
18 These alarms were applicable to the old HBD analyzer office system and do not apply to the current Devtronics system. The reference in TP-105 will be removed when it is next updated. The HBO indicated that he initially thought that this looked like a faulty tape. Then, the HBO, as a result of the hot wheel indication, requested clarification from the RTC Mech regarding the hot wheel tape. The RTC Mech was aware that the DED at this site had previously been taken out of service, and based on his observation of the hot wheel and hot bearing tape, interpreted the results to be a Afaulty tape.@ This information was relayed to the RTC who had contacted the HBO for directions, and the train was allowed to proceed.
The two employees had performed their assessments in an independent manner, with little exchange of information between them about the results of their analysis of the tapes for which each was responsible. Subsequently, the HBO examined the tape from the MacDuff detector and identified the warm bearing at the 95th axle. Based upon this Anew information,@ the HBO began to question the determination of Afaulty tape.@ The HBO had previously encountered a situation where a train had a BOJ and derailed, destroying the scanner on one side of the track. Reportedly, the output tape in that occurrence was similar to the tape at Oba in this occurrence. Unable to convince the RTC Mech of his concerns, the HBO made numerous calls to the RTC and to the S&C personnel in Toronto hoping to obtain verification of his fears regarding the status of the train. It was during this exchange that the train went into emergency.
- 15.6
Workload
On an average day, there were approximately 6,200 WIS site inspections (one complete train scan per WIS site inspection) during a 24-hour period. In roughly 1,100 of these events, the HBO was required to visually inspect a Atape@ presented on a screen and acknowledge having done so. Averaged out over a day, this amounted to 45 tapes to examine per hour; roughly one or more tapes to inspect and acknowledge per minute during peak travel periods. Each of those tape inspections took between 5 and 10 seconds to perform. For those tapes that met WB
FACTUAL INFORMATION
32 TRANSPORTATION SAFETY BOARD
criteria, the HBO was also expected to research the train=s previous readings and monitor future readings, which could take an additional 10 to 15 seconds. HBOs reported that this happened on the average about 10 times per shift.
In the month preceding the occurrence, the Edmonton office acquired responsibility for monitoring the sites previously monitored in Toronto and Montréal. The number of sites handled by the Edmonton office increased from approximately 200 to 400. Management indicated that, for a period of time before the centralization of the WIS data, the RTC Mechs attempted to monitor and track trains which showed signs of potential bearing failure. During this trial, they found that it was very difficult to accomplish this while also performing their other duties.
Figure 22 illustrates one of the three monitors in the Edmonton office showing the status of the WIS sites. Each rectangular box represents one WIS site and in total nearly 200 sites are monitored on this screen. Different colours are used to convey information about each site, such as a scan in progress, a site under repair, or a loss of data communication.
FACTUAL INFORMATION
TRANSPORTATION SAFETY BOARD 33
The RTC Mech=s responsibilities included monitoring the wheel impact load detector (WILD) system for identifying cars that had exceeded certain impact thresholds. This included managing the two-strike system whereby cars that have encountered two WILD detections within a 30-day period are recorded for tracking purposes. During the peak winter months of January and February, when the number of WILD alarms is significantly higher, the RTC Mechs can have 2,000 to 3,000 WILD messages to handle in a month. This number reduces to a few hundred per month in the balance of the year.
RTC Mechs maintained databases for such things as all train stops, air brake hose separations on line, and cars set off on line for any reason. These tasks were in addition to their duties associated with monitoring warm and hot wheels, or assisting the HBO in monitoring overheating roller bearings and dragging equipment. They also acted as a contact point for the Mechanical Department when derailments occurred, and were a resource to train crews and RTCs for other mechanical information. The busy season for RTC Mech activities was normally mid-December to the end of March.
FACTUAL INFORMATION
34 TRANSPORTATION SAFETY BOARD
- 15.7
Source of Bearings Set-off in 1999
A review of 130 cars set off CN trains for hot bearings in 1999 revealed that:
$ 51 were identified as hot bearings by the AWA; $ 14 were identified as hot bearings by TP-105 criteria; and $ 65 were identified as hot bearings by judgements made by the HBO/RTC Mech.
CN advised that the percentage of hot bearings identified by RTC Mechs/HBOs in the above data is higher than usual, and that for 316 set-offs in 1999, 106 (or about 33 per cent) were as a result of judgements made by RTC Mechs/HBOs.
- 16
Examination of Axle Components
The recovered pieces from the failed axle on car CN 604697 were examined (see Appendix E), as well as a wheel set from the non-derailed end of the same car. Damage to the axle pieces in the area of the burn-off precluded detailed examination 19.
The mate bearing on the failed axle was examined by sectioning away the cup and cages from the remainder of the bearing. Localized hardening of the metal (brinelling) 20 was observed on the outboard race of the cup adjacent to secondary impact markings observed on its outer surface. There was noticeably less grease on the inboard cone when compared with that on the outboard cone. The rollers and cages were in good condition. The cones were in good condition apart from some secondary oxidation on the race of the outer cone adjacent to the end cap impact area. The front and rear seals appeared to be in good working order.
The examination of the non-derailed wheel set revealed that both bearings were in good condition. The wheels on both axles were examined and determined to be within specifications. There was no sign of any previous damage to the internal components of the R-3 roller bearing, as might have occurred to this wheel set during the Jasper collision (see section 1.12.2).
19 The analysis of bearing failures is difficult because the destructive nature of the failure often destroys many of the parts. 20 Brinelling is a term used to describe hardness of a metal. It is based on the Swedish metallurgist who devised the Brinell hardness testCa rapid, non-destructive means of determining metal hardness.
FACTUAL INFORMATION
TRANSPORTATION SAFETY BOARD 35
- 17
Management and Supervision
- 17.1
Background Information
The work of the RTC Mechs and HBOs was performed by a relatively small number of persons (minimum two per shift) on an Aaround-the-clock@ operation. The work they performed had evolved over the years with the advent of other technological equipment installed at wayside locations, such as automatic equipment identification (AEI) readers, WILDs and cold wheel detectors. They continuously looked for ways to improve their use of the available data to enhance the safety of train operations. The offices where they were located were adjacent to the rail traffic control centre in Edmonton.
The supervisor of the HBOs was located in the same building, allowing for frequent direct supervision of the HBOs. The supervisor of the RTC Mechs was located in another building several miles away from their office.
- 17.2
Responsibilities and Reporting Structure in the Edmonton WIS Office
As the role of the RTC Mechs evolved to include the closer scrutiny of hot box tapes, management became aware that there were problems evident with the interface between the RTC Mechs and the HBOs. There was some discussion on whether or not to have the HBOs report directly to the RTC Mechs. However, this reporting structure was not formalized. With the expanding roles of the RTC Mechs, management questioned the need for maintaining both positions (HBOs and RTC Mechs) and discussions were held to find further efficiencies in this area.
In the year preceding this accident, the union challenged the railway company to maintain the positions of HBOs. In subsequent meetings, the union view was accepted. Due to technological improvements (e.g. Devtronics software), in 1999, the activities pertaining to HBOs and RTC Mechs were downsized and centralized at the Edmonton rail traffic control centre. All WIS (and WILD) data across Canada (except for several stand-alone WIS sites, mainly in Manitoba) were then routed to this location. At this time, there was no further delineation of the reporting structure between the RTC Mechs and the HBOs.
Management for the RTC Mechs believed that its staff was responsible for all aspects of the office in Edmonton, comprising final determination of data, including hot bearing tapes. In contrast, Operations management stated that the HBOs had full autonomy with regard to all applications of TP-105 criteria (dragging equipment and hot bearing detection), and that the RTC Mechs would have complete authority over hot wheel, cold wheel, and WILD sites.
FACTUAL INFORMATION
36 TRANSPORTATION SAFETY BOARD
- 17.3
Quality Management
CN=s S&C had a Quality Control (QC) Group whose purpose among other things was to perform some of the periodic tests required by the S&C Department. The QC Group did not verify the ongoing quality of installation, maintenance or testing of WIS components. It was left to the discretion of the local S&C supervisor to ensure/enforce/verify that the proper tests were performed. In 1995, CN assembled a Quality Action team to develop Abest practices@ to ensure the proper calibration of WIS devices on a system-wide basis. The information obtained through the efforts of this team were widely disseminated within the S&C Department.
During its investigation, the TSB examined several configurations (e.g. Servo vs Sentry; paddle vs electronic style of DEDs; with and without HWDs) of WIS on five CN subdivisions across Canada. Differences in procedures, local practices and systems knowledge by S&C personnel were noted as summarized below:
Procedures: $ non-standard forms were being used to record similar maintenance activities (such as monthly checks) $ instructions to S&C personnel contained regional variances
Practices: $ the input temperature was being increased or decreased to obtain the appropriate output reading, as opposed to proper calibration $ differing techniques were used for function simulator (such as overheating the flywheel, and climatizing the temperature of the simulator before and during use; e.g., removing it from direct sunlight and placing it in a shaded area or removing it from its stored location during winter and placing it in a heated area before use) $ different tools were used (e.g. thermometers, hammer for testing DEDs, and spray cleaners) $ the testing sequence differed from site to site (e.g. number of DED hits, order of detectors tested, and number of accelerometers tested) $ different testing thresholds were accepted by S&C technicians in the office
Systems Knowledge: $ some S&C maintainers had different criteria for determining what was an acceptable output $ a site with the same function simulator was repeatedly tested until an acceptable output tape was produced (calibration) $ the calibration of the function simulator could not be verified immediately before testing
Variability in procedures and practices was noted to result in different output values from site to site for a known input. A TSB review of output tapes generated by a CN TEST car showed that a computer controlled and recorded input heat, resulting in different output values from site to site. Many of the variances were noted to be biased towards over-sensitization of the system (i.e. a condition where a bearing is identified as overheated when its actual bearing temperature is less than the threshold value).
FACTUAL INFORMATION
TRANSPORTATION SAFETY BOARD 37
There was no nationwide overview of TEST car data to measure WIS site performance. TEST car operators were only capable of listening for an audible alarm indicating that the alarm threshold was exceeded. They were not given immediate feedback in terms of output from the WIS site.
Discrepancies were noted with the various manuals provided to the different user groups. For example, the TP-105 manual contained information showing the different criteria to be applied for various types of equipment or bearings (such as locomotives, passenger cars, plain bearings); yet, the system did not prompt the operators who were expected to apply these criteria. Some reference manuals specified different criteria when referring to identical items or conditions. Appendix C contains a comparison of selected topics for some of the more common manuals issued to the different user groups.
Some training manuals had not been revised for four to five years, and did not contain information on some of the newer technology on the system, such as the Devtronics software.
The TP-105 manual also described a number of conditions where a tape could be ruled as Afaulty@; e.g., a tape that Aloses heat on one or both rails is to be considered as a sign of a faulty tape.@ No mention was made in the manual of what an output tape may look like if a detector was damaged, possibly due to a derailed car, while a train was passing over a WIS site.
- 18
Regulatory Overview
Canadian Rail Operating Rules (CROR) were filed with Transport Canada (TC) for approval as per the requirements of the Railway Safety Act (RSA) by the Railway Association of Canada (RAC) acting on behalf of its member companies. These rules were approved by the Minister of Transport on 16 January 1990 under the authority of the RSA to be used on federally regulated railways and apply to all railway companies under federal jurisdiction. Under the RSA, these rules have the force of regulations.
FACTUAL INFORMATION
38 TRANSPORTATION SAFETY BOARD
CROR rules 110 and 111 state (relevant portions quoted):
INSPECTING PASSING TRAINS (a) When duties and terrain permit, at least two crew members of a standing train and other employees at wayside, must position themselves on the ground on both sides of the track to inspect the condition of the equipment in passing trains. When performing a train inspection, the locomotive engineer will inspect the near side of such train. When a group of wayside employees is present, at least two employees must inspect the passing train.
EXCEPTION: Crew members of passenger trains are exempted from the above requirements except when standing at meeting points in single track territory. However, every effort must be made to stop a train when a dangerous condition is noted.
TRAIN INSPECTION (a) The train and engine crew must know that equipment in their train is in good order before starting and inspect it whenever they have an opportunity to do so. Equipment added to a train enroute must be examined with extra care to ensure it is in good order.
(b) When crew members are on the rear of a moving train they must inspect, at every opportunity, the track to the rear for evidence of dragging or derailed equipment.
(c) All crew members on a moving train must make frequent inspections of both sides of their train to ensure that it is in order.
Before cabooseless trains began operations in Canada in 1987, the Canadian Transport Commission conducted an extensive study of train operations and included Atests, conducted to evaluate the reliability of the end-of-train unit and associated devices and to evaluate the risks associated with train operation without rear train crew. . . .@ 21 This study resulted in an order (R-41300) issued by the Railway Transport Committee to CN and CPR dated 14 December 1987 requiring that certain safety conditions be adhered to before commencing cabooseless train operations. This order was included in a manual entitled A decision pertaining to cabooseless train operations on Canadian National and Canadian Pacific Railways. This order included 38 clauses CN and CPR had to adhere to in order to operate trains without a caboose. Some of these clauses, relevant to this occurrence, are quoted below:
- 3
No cabooseless train shall be operated for a distance in excess of 60 miles without having passed an operational hot box and dragging equipment detector or without having been
21 Canadian Transport Commission, Railway Transport Committee, A decision pertaining to cabooseless train operations on Canadian National and Canadian Pacific Railways, December 1987, page 205.
FACTUAL INFORMATION
TRANSPORTATION SAFETY BOARD 39
inspected on each side of the train by employees referred to in item 1.11 22, or without having been stopped and inspected.
- 4
Prior to operation of any cabooseless train all gateway hot box and dragging equipment detectors shall be equipped with hot wheel detectors.
- 22
On arrival at crew change points, two members of the inbound crew of a cabooseless train shall respectively position themselves on each side of the track on which that cabooseless train is moving and shall inspect that train while moving outbound for defects and dangerous conditions and shall report by radio any defects or dangerous conditions to the crew of that outbound train upon completion of the inspection.
The RAC conducted a review of order R-41300 in 1994 which listed the instructions that CN and CPR had in place to comply with each of the requirements of the order. Some of the requirements had been implemented, others had been complied with by the issuance of GOIs by the railways, and others had been revoked. GOIs are instructions issued by the railway companies to guide their employees in respect to internal procedures to be followed. They are not submitted or approved by the regulator and can be taken out of the railways= operating manuals without notification to the regulator.
22 Item 1.11 lists employees who may have to perform inspections of passing trains and requires those employees to be provided with or have immediate access to an operational portable two-way radio capable of communicating with the crew of that passing train by CN and CPR. Following this review by the RAC, all aspects of the order were considered to be covered by the railways= internal documents, collective agreements, or were replaced by ministerially approved rules (such as the Railway Freight Car Inspection and Safety Rules, the Railway Freight and Passenger Train Brakes Rules, or the CROR). TC was satisfied with the level of safety indicated by the RAC analysis and revoked order R-41300 on 11 August 1995. Provisions were maintained for inspections at crew change points (provision 1.22 in the original order) and that trains be equipped with an end-of-train information system (provision 1.1 in the original order). There are no minimum regulatory guidelines for the direction of railways pertaining to the installation, inspection, calibration, alarm levels, and quality management of WISs. There is no existing regulatory requirement for any federally regulated railway to be equipped with WISs, or any other wayside inspection system.
FACTUAL INFORMATION
40 TRANSPORTATION SAFETY BOARD
TC did not have a program to monitor or audit WISs in order to ensure that they function properly or that they were tested, adjusted/calibrated in such a way to ensure consistent safe operation. 23 As part of TC=s national signals program, some regional TC inspectors monitored some of the WIS sites for obvious signs of damage which could have been caused by an object dragging from a train striking a component of the WIS. The number of such sites to be inspected was at the discretion of each region. The TC inspector was normally accompanied by a railway S&C maintainer, who among other things, took the voltage readings. Some TC inspectors used a form to record their findings which prompted them to verify mostly the appearance of the components, but not to test whether they met pre-approved railway or manufacturer standards.
- 19
Observations of WISs on Some Other Canadian Railways
TSB investigators visited a number of WIS sites across Canada accompanied by railway personnel (WIS sites in Quebec, Ontario and Alberta were included). The railways involved, in addition to CN, were CPR, VIA and Quebec North Shore and Labrador (QNS&L). After reviewing the different WIS installations, it became apparent that there were differences in the manner in which protection against overheated bearings was provided on each railway. There were also many locations in Canada where there was no HBD protection. Some of these subdivisions carried scheduled passenger trains and/or shipments of dangerous goods. Other subdivisions that were equipped with HBDs had them spaced in excess of 25 miles of each other. The tables contained in Appendices D and E show some of these areas, as well as a comparison of some of the different criteria that were noted.
23 In reply to a TSB letter requesting information on HBDs, TC provided the following: A. . . please note that Transport Canada does not have at this time active legislation regarding hot box detectors, nor does it have a national program to audit and monitor hot box detector systems. Finally, the Department does not issue specific guidelines to the railway industry on this matter.@
ANALYSIS
42 TRANSPORTATION SAFETY BOARD
- 0
Analysis
The inspection of the derailed rolling stock, subsequent to the accident, revealed a BOJ at the No. 3 wheel on car CN 604697. The mode of failure of BOJs is well known throughout the railway industry. As the roller bearing at the L-3 location overheated and seized, the axle extruded, causing a reduction in cross-sectional thickness. After sufficient thinning occurred, the overheated axle could no longer support the weight of the loaded car and complete axle fracture ensued. The marks on the track indicate that the location where the truck side of the car dropped to the track as a result of the axle fracture was approximately 200 feet before the WIS at Mile 255.1. The train continued in a derailed state which damaged the HBD at that location as it passed over it. When the train reached the east switch at Neswabin, approximately seven miles later, the main derailment occurred.
The analysis will focus on the roller bearing failure, inspections used to protect against roller bearing failure (both physical and electronic inspections), related management and supervision issues, as well as regulatory overview.
The train crew members= reaction to the information from the WIS at Mile 255.2, near Oba, was influenced by their experience at that same site on their previous trip. (On the evening before the accident, the crew members were stopped by an audible Adragging equipment@ alarm, and they had walked the length of their train and had found nothing wrong. Subsequently, the DED was declared out of service, although the talker system continued to deliver messages to passing train crews relating to the DED when activated.)
On the day of the accident, as the train proceeded over the WIS at Oba, the train crew members received a talker message, warning them of Adragging equipment, dragging equipment, multiple alarms, multiple alarms.@ The hot bearing and hot wheel indications were immediately identified by repetitive and similar audible tones, by system design, as the train was proceeding over the detector. With the information provided, the crew interpreted that the multiple alarms made reference to the dragging equipment component of the WIS site, rather than a variety of problems, including an overheated bearing.
The train crew members believed that there was no dragging equipment on their train, and considered the information received from the WIS to be inaccurate in consideration of:
$ the crew=s experience the previous night with the same DED; $ the crew=s belief that the DED was not working properly; $ the crew=s understanding that the train had been inspected uneventfully by all WIS components at the two previous sites (Shekak and MacDuff); and $ the three separate wayside inspections the train received en route towards Oba.
The train crew members contacted the RTC to inform him that they were stopping due to the WIS alarm as per instructions and to make him aware of their experience with the DED at that same site on the previous trip.
ANALYSIS
TRANSPORTATION SAFETY BOARD 43
The RTC knew that the DED at that location had been out of service, and the train crew had not reported any prior operating problems since leaving Hornepayne. He offered to contact the HBO office in Edmonton to obtain further advice. Both the train crew and the RTC were unaware that the train had triggered a warm bearing Ayellow@ indicator on the Devtronics screen at the same part of the train (around the 95th axle) at MacDuff, as this information was not provided to them.
In Edmonton, the company protocol as established by TP-105 (requiring cars with warm bearings to be tracked and subsequent inspections monitored) was not followed. This resulted in employees in Edmonton initially reviewing the data from the site at Oba in isolation, and making decisions without the benefit of the earlier scan at MacDuff, some 13.6 miles previous. Without the benefit of the earlier data, and because the RTC Mech did not identify the WIS output tape as one produced by a scanner damaged by a derailed car, the RTC Mech incorrectly concluded that the tape was faulty. The RTC Mech=s decision was accepted because of the perceived line of authority between the RTC Mech and the HBO.
Company training programs did not instruct employees how to identify or recognize a tape indicating a site damaged by a derailed wheel. The operating manual also did not instruct employees how to specifically deal with an abnormal scan at a site subsequent to a warm reading. The graphic examples in the operating manual, showing a similar pattern as the Oba tape identified as defective, only served to reinforce the RTC Mech=s initial assessment. An experienced operator may make the possible connection, as the HBO eventually did, that the Afaulty@ scan beginning at the same part of the train where the warm bearing was previously identified may be two related events of a safety problem.
- 1
Roller Bearing
The nature of the failure that led to the overheating of the roller bearing could not be determined due to the amount of damage. The weight of the loaded car was within allowable limits, and the load was equally distributed over the length of the car body. Therefore, the axle load would have been equally shared and is not considered to have contributed to the overheat condition.
The wheel had travelled less than half the number of miles expected for a requalified roller bearing to travel before requiring replacement. Therefore, the number of miles travelled by the wheel set was not considered to be a significant risk factor.
The condition of the car as examined after the accident (e.g. no grease on the floor underframe area immediately above the roller bearing location) indicates that there were no obvious signs of the car having had a bearing problem that should have been identified during safety inspections or wayside inspections performed by employees while the car was en route. This was further supported by the successful safety inspections of the roller bearing at numerous WIS sites between the origin of the car in Prince George and Neswabin.
The investigation did not determine what effect, if any, the prior collision at Jasper might have had on the performance of the L-3 bearing from car CN 604697. It is possible, although unlikely, that the bearing experienced collision damage in Jasper that precipitated its subsequent failure given the following:
ANALYSIS
44 TRANSPORTATION SAFETY BOARD
$ the satisfactory inspection of the mate bearings from the same car; $ the successful performance of the other wheel sets in the cars involved in the Jasper collision; and $ the distance that car CN 604697 was from the head end of the Jasper train.
- 2
Inspections
- 2.1
Electronic Monitoring
Axle failure and subsequent derailment may occur if developing problems on axle bearings go undetected. Electronic monitoring, by either wayside or on-board journal bearing detection devices, can reduce the risk of catastrophic axle failure due to unsatisfactory bearing performance. However, there is equipment operating in Canada that cannot be reliably monitored electronically by wayside scanners. It was noted that:
$ most locomotives, including those in passenger service in Canada, have no on-board HBD devices; $ twenty-five per cent of the passenger cars used in corridor service and all transcontinental stainless steel cars have external journal bearings and no on-board heat monitoring; and $ some equipment, such as specially equipped freight cars, passenger cars and locomotives, may not be accurately scanned by wayside HBD equipment (due to mechanical parts between the bearing and the scanner that can obscure the view of the bearing). Some of these locomotives are used on high-speed passenger trains, and regularly travel at speeds of up to 95 mph.
Experience has shown that the design of passenger and locomotive roller journal bearings, combined with their relatively frequent inspection schedules, serves to reduce the incidence of bearing failure. Although the railway=s detector networks have detected overheated roller journal bearings on both passenger cars and locomotives, the system is designed to give an optimal scan for conventional freight car trucks. In other words, the variety of bearing designs and housings affects the results of the heat scan, with some bearings reflecting values much less than actual, and even nil readings. The safety of train movements is dependent on consistent and accurate scanning of all actual bearing temperatures. As the WIS cannot reliably scan all varieties of bearings in use, it cannot be considered a reliable defence to assess all adverse bearing conditions.
- 2.2
Physical Inspections
In areas where no electronic monitoring is available, physical inspections are relied upon to detect defective bearings before they result in complete axle failure. While there is no need to elaborate on the merits of inspections by certified car inspectors, the ability to fulfill this goal is limited by several factors:
$ The condition of the internal parts of the bearing cannot be reliably detected by inspecting the visible portions of the external parts (e.g. outer race, grease seals, backing ring and end cap). Furthermore, some external parts are not in plain view (e.g. locomotive journal bearings). The external parts are poor indicators as to the condition of the internal parts.
ANALYSIS
TRANSPORTATION SAFETY BOARD 45
$ Safety inspections performed while cars are stationary in main departure terminals, typically after the cars have been at rest for several hours and bearing temperatures are close to ambient, do not facilitate the identification of poor performing bearings. It is also not possible during these stationary inspections to predict future bearing performance. As shown in Appendix D, there are many locations (the majority of which have low traffic densities) where there are no HBDs and railways are largely dependent on the limited ability of these physical inspections to provide a level of safety to their operations.
$ Once a train is in motion, wayside inspections on both sides of a train are not always performed, as demonstrated in this occurrence. The three train crews that met train 304 between Hornepayne and Neswabin all inspected the train on the north side only and did not detect an overheating bearing on the south side of car CN 604697. When wayside inspections are performed on both sides, a car journal bearing that is in the initial stages of failure is not likely to be detected until there is some obvious sign of distress, such as smoke, fire or unusual noise.
$ A tempilstik cannot always aid a person performing physical inspections to identify bearings in the early stages of distress, as described in further detail below.
ANALYSIS
46 TRANSPORTATION SAFETY BOARD
- 2.3
Tempilstik
Because train crews have relatively little technical expertise in the identification of distressed bearings, they frequently have to make judgements outside their area of expertise. Unless the identified condition is somewhat obvious, this task can be challenging, even to a person with more in-depth mechanical knowledge. As a result, CN train crews are normally provided with an AAR-approved tempilstik as the tool to use to help them determine whether a bearing is overheating. Such an instrument does not seem well suited to the task. Frequently, train crews are advised that the car which must be inspected is a significant distance away (behind the locomotives), sometimes more than one mile. Receiving an alarm, bringing the train to a stop, verifying with the RTC the car in their consist which has to be inspected, and donning the proper clothing to perform the task in winter months take time. The time interval may allow a bearing in the early stages of distress to cool below the temperature required to melt the tempilstik before a crew member has a chance to inspect it, thereby increasing the risk of missing detection.
In sub-zero temperatures, the task of identifying an overheating bearing with a tempilstik becomes even more difficult. For example, because the CN HBD system is designed to detect a bearing that is running 180F or more above ambient, if the ambient temperature is minus 40F, a bearing will exceed the alarm threshold if it is running at 140F or warmer. A crew member will be unable to identify a bearing operating at 140F as overheated when using a tempilstik which only melts at 200F. This may explain why, frequently, train crew members find no defects when stopped for a possible hot box inspection.
In consideration of the above, a train crew member performing an inspection for possible bearing distress cannot reliably identify a developing problem due to the tools, ambient temperatures, and time factors involved. In addition, wayside inspections by employees and static inspections by car inspectors in train yards cannot reliably detect or predict bearing failure. Finally, inspection of stationary cars by certified car inspectors in train yards is not likely to identify a roller bearing that is going to fail because most of the bearing parts are internal and not visible. Many places in Canada rely mainly on these type of inspections to identify roller bearing defects.
- 3
Wayside Inspection System (WIS)
- 3.1
General
The CN WIS includes three lines of defence associated with the identification of, and protection against, bearing failures. The first is the advance warning alarm (AWA) in the field. The second is an operator using the lower TP-105 criteria to screen out hot boxes (advising the train crews through the RTC). The third line of defence is the earlier detection of potential failing bearings by identifying warm boxes at an even lower criterion. The first two defences are related to safety, while the third defence is related to both safety and company efficiency. With CN, the first line of defence is more stringent than on other railway companies. The second and third lines of defence provide additional levels of protection which most other railways do not have. By comparison to other Class 1 railways, CN has designed a well-defended system (i.e. with multiple levels of
ANALYSIS
TRANSPORTATION SAFETY BOARD 47
defence). However, as with any complicated safety system, a thorough review can reveal deficiencies and opportunities for improvement with the components of the system and the procedures and practices of the people who use them. The TSB investigation, although not an exhaustive technical review, has identified several items pertaining to WIS testing that appear to warrant further attention.
- 3.2
Monthly Testing
Monthly testing of the WIS at CN and some other Canadian railways was performed using a function simulator. By electronically simulating a passing train with bearings at a preset temperature, the ability of the system to accurately read a known input temperature was tested. The temperature setting used in the function simulator test procedure was 135F above ambient. However, the WIS alarm threshold temperature setting was 180F above ambient. Therefore, because the monthly test was not conducted at the actual alarm threshold, the test was verifying that the scanner was correctly reading at the test temperature. However, it was not verifying that the AWA and Atalker@ would activate at the minimum critical bearing temperatures.
- 3.3
Dynamic Testing
CN is the only federally regulated Canadian railway known to have a car capable of dynamically testing the HBD component of its WIS sites. It only had one car that was so equipped, and because of its busy schedule, it could not regularly test all CN WIS sites. WIS sites in eastern Canada were not dynamically tested for several years because this car was based in western Canada. Also, because the speed of the TEST train is limited to maximum freight speed, typically 60 mph, the dynamic testing in some places is conducted at less than maximum operating speeds (e.g. the heavily used Kingston Subdivision with daily 95 to 100 mph passenger trains). CN relied on the HBD manufacturers to measure the response of scanners to speed in a laboratory environment, and to build the equipment to respond to these specifications. However, dynamically testing the operation of the WIS in its actual environment at speeds much less than the maximum track speed does not ensure that the alarm system will operate as intended at those elevated speeds.
No federally regulated Canadian railway is presently dynamically testing HWDs and DEDs which, together with HBDs, are essential components of a sophisticated wayside inspection safety system.
Although the railway matched the TEST car process to the design of the primary type of traffic (i.e. freight car bearings), this affords little protection to those railway operations that are not covered by these parameters.
- 4
Management/Supervision
- 4.1
Roles and Responsibilities in the WIS Office
Due to the pioneering efforts associated with the small number of personnel who work in the field of monitoring Ahot bearing@ and Ahot wheel@ conditions, management has typically allowed those employees to operate in a Ahands-off@ learning and experiential environment. This lack of direct involvement in day-to-day
ANALYSIS
48 TRANSPORTATION SAFETY BOARD
activities has allowed employees to come up with many safety improvements in the use of the technology. However, there have been some negative effects from this indirect style of supervision.
The RTC Mech positions were management level positions and frequently RTC Mechs exercised discretion as to the application of TP-105 criteria (e.g. when or how cars identified by the system would be handled). The roles and responsibilities of the RTC Mechs evolved from a focus on hot wheel tapes to a more global approach involving examination of hot bearing tapes, when warranted. By examining both the hot wheel and the hot bearing detector tapes, the RTC Mechs believed that they were in a position to Aoverrule@ the HBO if they felt that the readings reflected a Asticking brake@ as opposed to a bearing failure. As part of management, the RTC Mechs felt empowered to exercise their discretion with regards to TP-105 criteria.
The HBO positions allowed them no flexibility to adapt company policy; therefore, some frustration was created by the different methods of responding to cars with similar stimuli. The overruling of the HBO decisions by the RTC Mech tended to erode the clear distinction of responsibilities assigned to the HBO by management. With time, the perception of both the RTC Mechs and the HBOs was that the RTC Mechs had the final authority on office matters, given the fact that they were management and that they had the ability to Aoverrule@ the HBOs.
The differences of opinion between HBOs and RTC Mechs and perspective on their roles and responsibilities had led to previous conflicts, and there was some residual tension between certain members of the two groups subsequent to the reorganization and related arbitration case. While there had been some discussion by management regarding having the HBOs report directly to the RTC Mechs, this was never formally implemented. Conflicting views were espoused by both Mechanical and Operations management regarding responsibilities of the WIS office personnel.
ANALYSIS
TRANSPORTATION SAFETY BOARD 49
There were instructions for the HBOs and the RTC Mechs to discuss any circumstances where hot wheels and hot bearings did not meet TP-105 criteria and either felt a train stop was necessary. However, no clear procedure was in place as to who had the final authority, or how to resolve potential conflict. Given the perceptions of the office personnel, the final decision would go to the RTC Mech.
In this occurrence, when the RTC Mech declared that there was a faulty tape, the HBO accepted his decision allowing the train to proceed, even though he was not certain that this was the appropriate action. It was not until the train was allowed to proceed that the tape from the previous WIS site (MacDuff) was checked. Once a link was made between the readings of the two sites, the HBO began to look for confirmation of his suspicions by contacting others. Rather than speaking with his direct supervisor to resolve his concerns, the HBO made numerous calls to the RTC and the S&C personnel in Toronto hoping to obtain verification of his concerns regarding the status of the train. It was during one of these exchanges that the train went into emergency.
Misconceptions between the two key users of the WIS data (HBO and RTC Mech) about their specific responsibilities and lines of authority, combined with communication difficulties, precluded a highly cooperative analytical environment. This resulted in the train not being stopped once the HBO realized that it was possible that the WIS indications reflected a safety problem. This occurred despite the fact that both the HBD and DED had correctly indicated that something was wrong.
- 4.2
Systems Knowledge
In order for a distributed system, such as the WIS, to operate effectively, the various components must be properly integrated. For employees, this involves ensuring that each has an adequate systems knowledge to understand the effect of their decisions and actions on other components of the system.
Some of the employees interviewed received little formal training and did not clearly understand their responsibilities. Employees in charge of reviewing safety critical information, such as the integrity of wheels and bearings on a passenger train, need to clearly understand what they are monitoring and clearly know what their authority is if they notice a problem (e.g. order a train to stop immediately). In this accident, the experienced HBO was not comfortable that everything was normal with the train; however, he did not feel that he had the authority to stop the train and advise the crew members to inspect their equipment. Management=s protocol did not clearly state that anything less than an acceptable scan should be cause for a precautionary mode of operation, even if the train crew members were to be informed as to the possible existence of a defective condition on their train. It is unknown
ANALYSIS
50 TRANSPORTATION SAFETY BOARD
whether the decision reached by the crew (to continue without inspecting their train) would have been different had the HBO called the train crew, rather than the other way around, and informed the crew of the information he had from the last two WIS sites.
Other examples of key people not having a good understanding of the overall system were in the area of the computer software (e.g. the algorithm calculations that the Devtronics software performs on a scanned train). The codes for W2 and W3 alarms were not well understood by some of the operators; yet, these warning alarms were meant to initiate a safety monitoring response from the RTC Mechs and HBOs. Without a good understanding of the basis for these alarms, some of these primary users were not able to properly analyze the information provided by the system.
In essence, the HBOs were taking the time to examine these tapes with the intent of finding a high deflection, when in fact they never would. The value of these tapes was in the ability to identify a potentially warm or hot bearing amidst a very low overall detector reading. Their normal reaction was to respond to TP-105 criteria for maximum values or differentials. This way of working did not take into account the ability of the computer software to highlight a car with possible developing problems, regardless of whether the field equipment was calibrated correctly or not. Responding to safety messages in this manner nullified some of the sophisticated safety features built into the system. Other users of the Devtronics software use the algorithms to directly advise the train crews of potential hot boxes, rather than use the data to determine whether an HBO should examine a train chart for defects.
The differing levels of employee awareness of company protocol and systems knowledge (regarding the WIS) demonstrate that either some employees did not understand their roles and responsibilities, or the method used to train and ensure retention was inadequate.
- 4.3
Workload
As stated earlier, the CN WIS included three lines of defence associated with the identification of, and protection against, bearing failures. The first two lines of defence each identified hot boxes, and involved a message being communicated to the train crew (either by the RTC, or the talker of the AWA). The third line of defence was the real-time trend monitoring by the HBOs in Edmonton, who were to identify and track warm boxes at a lower criterion leading to the earlier detection of potential failing bearings. This latter defence, which results in the application of stricter WIS criteria than other railways, has increased safety potential but can be labour-intensive.
The set-up of the system required the HBOs and RTC Mechs to perform a number of manual tasks dependent on differing criteria that the operators had to track mentally. This added to their workload and was subject to potential operator error. The computer software as installed did not assist them in identifying key information, such as the number of the rolling stock involved, the train, the location of the next HBD site in the direction of travel, and the information from the previous HBD site. Keeping track of this information mentally may have been possible when the WIS sites were distributed in multiple offices (lower number of sites). The centralization of monitoring increased the number of WIS sites from 100 to 200 in the Western region, then
ANALYSIS
TRANSPORTATION SAFETY BOARD 51
added in nearly 200 more sites from Toronto and Montréal. This became a daunting task to monitor during periods of peak activity, particularly when train routings and track layouts were unfamiliar to the operators (e.g. a train leaving one subdivision to go to another subdivision before reaching the end of the first one). This could be further exacerbated when some sites generated more alarms because their calibration was over-sensitive.
Given the workload associated with the HBOs= tasks and the need for the HBOs to prioritize activities, the HBOs adapted their task to the changes in workload by focussing on the second line of defence items (those bearings identified as hot by TP-105 criteria), even though the lower-level readings are an integral part of the third line of defence. Automation of the real-time trending process in the future could assist in making even better use of these data.
The amalgamation of the monitoring for all WIS sites into one office, combined with the number of non-automated computer tasks, made it difficult for HBOs/RTC Mechs to follow all TP-105 requirements. Without following the TP-105 requirement, the potential for early detection of distressed bearings was reduced.
- 4.4
Impact of Variable Output on Workload
Variances in the acceptable output of each WIS lowered the quality of the data and, thereby, the safety afforded by the system. Although the HBOs were required to track cars identified with early indications of overheating bearings over several sites, their efforts were sometimes hampered by the quality of the data from the system.
Variable outputs made comparative analysis from site to site difficult. When the output from site to site for a constant input was varied, an operator=s ability to make meaningful use of the WIS data and make informed decisions about whether a bearing was warming up or cooling down was diminished.
Outputs from WIS sites that were over-sensitive led to an increase in workload of HBOs, and increased the false alarm rate. This also affected user confidence in the overall system, and prompted users of the data to consider that the system was faulty, rather than the train. The rate of false alarms within the system and a lack of meaningful feedback that field repairs actually corrected the original problem contributed to the maintenance practice of allowing four trains to operate over a site before certifying the WIS site as repaired. While, on the surface, testing the proper functioning of the WIS in this manner appears practical, this method is subject to error.
The repair validation objectives (see Figure 23) should actually be to ensure that trains which are defective generate an alarm by the WIS (box C), and trains which are not defective do not (box B). Coupled with this is the need to minimize two types of errorCthe error associated with a non-defective bearing generating an alarm (false positive, box D) and the error associated with a defective bearing not generating an alarm (false negative, box A).
The validation scheme employed at the time of the occurrence (see Figure 24), testing for the absence of alarms, does not ensure that a defective bearing will in fact trigger an alarm (box A). While the probability is relatively low, it does leave the system vulnerable to allowing a train with a defect properly identified by the
ANALYSIS
52 TRANSPORTATION SAFETY BOARD
WIS from being stopped while validation is being performed (box C). Should one of the four trains initiate an alarm, the test would be treated as a failure and the WIS would be identified as requiring further repairs by an S&C technician. Furthermore, validating a WIS site after repairs have been performed based on the absence of alarms does not ensure that a true alarm state will be detected.
- 4.5
Tape Interpretation
The impact of not tracking trains which meet warm box criteria over the previous and next WIS sites in accordance with CN TP-105 protocol is that a WIS tape may be judged Afaulty@ when examined in isolation and that a developing bearing problem may not be proactively identified.
The unusual spikes on the accident-related WIS tape made it immediately evident that there was a problem, either with the WIS or the train. On its own, the loss of heat on one rail subsequent to the 95th axle might suggest that a Afaulty@ tape had been transmitted. When this information is examined, in combination with the tape generated as the train passed over the previous site at MacDuff (which showed that there was a warm bearing at the 95th axle), one might conclude that something catastrophic occurred at the 95th axle. In fact, subsequent to the initial determination of a Afaulty@ tape, the HBO examined the WIS tape from the previous site (MacDuff), and recalling a similar event from the past, he suspected that the train had derailed and damaged the HBD at Oba. The HBO was unable to convey his concerns in time to reduce the impact of the derailment.
Because the HBO and the RTC Mech did not initially use all the information available to them and did not work collaboratively to exchange critical pieces of information, the safest course of action (to stop and inspect the train) was not taken.
- 4.6
Quality Management
Although management had some elements of a quality assurance program, the program was largely in place in theory only and delivered in practice mainly within the S&C Department. The program did not oversee that the entire safety systems were functioning as designed. Management and supervision did not coordinate with all
ANALYSIS
TRANSPORTATION SAFETY BOARD 53
parties involved (Transportation, Equipment and Engineering) to provide a systems approach to quality management. Although the number of axle failures due to BOJs is relatively low, the adverse consequences of such occurrences warrant serious attention.
Communication failures were noted between some of the key people involved (e.g. the RTC Mech and the HBO). Written materials provided to the employees within the Signals Group were noted to be inconsistent with local instructions to their field staff, typically in the form of e-mails (e.g. different acceptable limits for the maximum and minimum values for test tapes, and the number of degrees above ambient heat for the input when calibrating the system). Variances in procedures, practices, and systems knowledge in both the field and office activities are indicative of an inconsistent application of a quality management program.
Without a comprehensive quality management program in place, inconsistencies were introduced into the HBD system which created system performance variances and made comparative analysis of the WIS data from site to site difficult.
- 5
Regulatory Overview
TC inspectors are required to fulfill the goal of the Railway Safety Act, which is An Act to ensure the safe operation of railways and to amend certain other Acts in consequence thereof.
In achieving this goal, the Rail Safety Directorate has a number of regulatory programs that the regional inspectors are required to deliver, but the regional inspection programs do not include a formal WIS inspection program. Although TC inspectors visit some WIS sites and complete an inspection form to note deficiencies which they then submit to the railway for corrective action, these inspections are not required in a documented regulatory program. The form contains the
ANALYSIS
54 TRANSPORTATION SAFETY BOARD
items that an inspector should inspect while on site. Most of the items are cosmetic in nature (such as paint on the apparatus, cleanliness of mirrors). Without regulatory requirements, the inspectors are limited in what items they inspect during visits at WIS sites.
Although there are rules to ensure that some types of inspections are performed on a train while en route, these are performed by employees infrequently (when passing other trains and performing running inspections of their own train) and these types of inspections would only likely reveal a very advanced condition. A visual inspection from the ground of a passing train would rarely reveal a developing problem with a bearing if that problem had not yet significantly progressed, and an inspection performed by a crew member from a locomotive while the train was running would only reveal problems which display significant visual signs (which would mean the defect was already at an advanced state).
With the RAC review of order R-41300 and with TC adhering to the federal government=s deregulatory approach, the order was revoked as the review demonstrated that both CN and CPR had provisions in place to comply with the order. It is important to note that order R-41300 only applied to CN and CPR and no other railway was ever legally required to comply with it. Compliance with order R-41300 by other railways was encouraged by TC and the RAC, as it was considered a Abest practice@ approach to operating cabooseless trains. When TC revoked the order, it relied in part on the railways= instructions at the time of revocation to ensure and maintain the level of safety provided by order R-41300.
In accordance with federal regulatory requirements, railway companies do not have to request permission from, nor advise, TC when they wish to modify or remove an instruction from their set of operating procedures. In revoking order R-41300, TC removed the only regulatory reference to hot box and dragging equipment detectors and the maximum distance between inspections while the trains are en route (clause 1.3 of order R-41300 which stated 60 miles). Presently, railway companies can operate trains for significant distances without effective inspections which would provide reliable early detection of developing bearing problems.
It is acknowledged that most railways have installed WISs to enhance the safety of their operations. However, TC does not have regulatory requirements for such systems to be installed, or for minimum distances between WIS sites. TC has not provided requirements or guidelines for the method of installation, inspection, calibration, alarm levels and some system to ensure the correct functioning of such technologies. These provisions are left to the railway companies in conjunction with the manufacturers of the technology and have resulted in the variety of installations and operations identified in this investigation.
CONCLUSIONS
56 TRANSPORTATION SAFETY BOARD
- 0
Conclusions
- 1
Findings as to Causes and Contributing Factors
The roller bearing at the L-3 location on the south side of car CN 604697 overheated and seized, resulting in a burnt-off axle journal and the derailment of 21 cars.
The definition of Afaulty tape@ allowed rail traffic control mechanical service representatives (RTC Mechs) and hot box operators (HBOs) to disregard scans which met or exceeded TP-105 criteria. They believed that the information on the tape did not represent actual train conditions. This resulted in a train with a defect being allowed to proceed.
Unclear lines of authority and communication difficulties precluded a highly cooperative analytical environment. This resulted in the train not being stopped once the HBO realized that it was possible that the Wayside Inspection System (WIS) indications reflected a safety problem.
The train crew members did not perform a walking inspection of their stationary train after having been provided with multiple audible alarms of possible defective conditions; therefore, they did not detect the single derailed car at the Oba location, missing an opportunity to greatly reduce the consequences of the overheated roller bearing.
Company procedures (TP-105) regarding the monitoring of the bearings identified as Awarm@ subsequent to the scan at MacDuff located 13.6 miles before the WIS at Oba were not followed. This resulted in the information from the Oba site being interpreted in isolation.
- 2
Findings as to Risk
A train crew member performing an inspection for possible bearing distress, after having been stopped by a WIS, may not reliably identify a developing problem due to the tools, ambient temperature and time factors involved in performing the inspection. Therefore, a defective bearing may go undetected and remain in service.
Other types of physical inspections performed by train crews either from the locomotive or on the ground observing a passing train, or pull-by inspections by wayside employees and car inspectors in train yards, cannot reliably detect a bearing failure or identify a developing bearing failure.
Safety inspections of stationary cars by certified car inspectors in train yards cannot ensure the future condition of the bearing from origin to destination, and railways can operate trains for significant distances after performing such inspections.
CONCLUSIONS
TRANSPORTATION SAFETY BOARD 57
There are subdivisions not equipped with WISs where railways rely on physical inspections (i.e. safety inspections, wayside inspections, passing trains, and train crews) to ensure the safe mechanical condition of the bearings on their trains.
Because journal bearings on some types of equipment are not accurately scanned by wayside hot box detectors (HBDs), and since most equipment including some used on high-speed passenger trains do not have on-board journal bearing heat detection, axle failure and subsequent derailment may occur when developing problems on bearings go undetected.
Monthly testing of the HBDs and hot wheel detectors (HWDs) at Canadian National (CN) and some other Canadian railways is not performed at the alarm threshold levels; therefore, it is not known if the alarm system will activate at the minimum threshold levels.
CN had one TEST car that was capable of dynamically testing the HBDs and it had not travelled in eastern Canada for a period of over three years. The car did not dynamically test HWDs or dragging equipment detectors (DEDs). No Canadian railway other than CN is known to be dynamically testing its WIS sites.
CN dynamically tested its HBDs at speeds typically no greater than 60 mph; therefore, it is not known if the alarm system will activate as intended at maximum passenger train speeds.
The number of WIS sites to be monitored, combined with the task-intensive and memory-reliant nature of the HBO=s duties, made it difficult for the HBO to follow all TP-105 tracking requirements, reducing the potential for early detection of distressed bearings.
Communication failures between key users of the system, combined with differences in procedures, practices and systems knowledge, indicate that there was no consistent systems approach to quality management for the WIS safety devices.
There is currently no regulatory requirement for a railway company to have safety devices such as the WIS in place despite the risks that may exist in its railway operations (e.g. high-speed passenger travel and dangerous goods).
There are no minimum regulatory guidelines for the direction of railways pertaining to installation, inspection, calibration, alarm levels, and quality management of the WIS.
Transport Canada has no national program to audit and monitor WISs, to ensure the safety of operating trains as it relates to failing bearings, wheels, and dragging equipment while travelling on territories equipped with WISs.
SAFETY ACTION
TRANSPORTATION SAFETY BOARD 59
- 0
Safety Action
- 1
Action Taken
- 1.1
WIS Improvements
Subsequent to the accident, a large number of safety initiatives were undertaken by Canadian National (CN) to address the safety deficiencies identified in the areas of reference manuals, work procedures, job aids, and supervision relating to the activities of the rail traffic control mechanical service representatives (RTC Mechs) and hot box operators (HBOs) as follows:
$ CN has issued a document titled Wayside Inspection Systems Chart Handling Procedures which is considered to be a supplement to TP-105. The stated goal of this document, issued in April 1999 and re-issued in January 2000, is A. . . to provide definite processes for chart reading and understanding roles and responsibilities of the RTC Mech and HBO,@ and training was provided to HBOs and RTC Mechs on the changes. The document contains descriptions of faulty tapes, including signs of possible derailment, and the actions that should be taken by specific parties.
$ CN states that it has now ensured that, when the Wayside Inspection System (WIS) issues an alarm directly to a train, this alarm takes precedence. CN further explained that no amount of experience, judgment or feeling on the part of the HBO or the RTC Mech can override such an alarm.
$ The RTC Mech is no longer allowed to override the HBO=s decision regarding TP-105 decisions. CN states that TP-105 is now applied strictly and is covered in paragraph 3(c) of the above-mentioned document.
$ The faulty tape criterion has been tightened up. CN is considering to make it an absolute stop of the train when a chart is deemed to be Afaulty.@ CN stated that some charts which could be deemed faulty are now being read as a potential derailment due to the Neswabin occurrence.
$ CN has put system maps on the HBOs= desks to help them conceptualize the various subdivisions.
$ Series of Ateam building@ sessions were provided to all RTC Mechs and HBOs, including the spares who normally work the HBO job. The training was provided by Grant MacEwen College in Edmonton and was comprised of 2 two-day sessions. The curriculum consisted of:
communications
conflict management
stress management
focus on performance SAFETY ACTION
60 TRANSPORTATION SAFETY BOARD
$ CN has now ensured that its supervisory program will include the HBOs. It has implemented the following:
audits of the journal advance warning signal (JAWS) and other reports which are completed by the HBO;
more direct contact with the supervisors; and
operator training which stressed the point of more communication between HBOs and their supervisors. CN has dedicated considerable capital and operating funds to the further expansion of its hot box detector (HBD) network. Main route HBD spacings continue to be reduced. Further, in April 2000, CN lowered the Aalarm@ threshold for TP-105 hot alarms on 20 branchline subdivisions that have HBDs spaced 40 miles apart or more.
- 1.2
Regulatory Action
Transport Canada (TC) has issued a guideline with respect to the recently amended Section 11 of the Railway Safety Act (RSA) relating to engineering works. The intent of the guideline is to clarify for all parties what is required by Section 11 of the amended RSA. A multi-party committee, including representatives of the railway industry, consulting engineers, governments, utilities, and professional engineering associations, developed this guideline. It is incumbent upon each railway to ensure that, for all equipment used on their tracks, including WISs, they have the proper documentation to support the variety of equipment and that the employees are properly trained for inspecting and maintaining the equipment. TC is moving towards monitoring the railway companies for compliance to Section 11 of the RSA.
- 2
Action Required
As an ongoing safety initiative, CN has developed a unique real-time trend monitoring system which incorporates continuous learning into the process. The system would be enhanced if it included a more comprehensive form of quality management so that, as new opportunities are realized within the system, the appropriate procedures are put in place, the associated training is provided, and best work practices are adopted.
SAFETY ACTION
TRANSPORTATION SAFETY BOARD 61
During this investigation, a number of issues emerged which, if addressed, may enhance both the efficiency and safety afforded by the existing system. CN may wish to give consideration to:
$ Systems Knowledge and Workload
When operating in an exploratory manner, systems knowledge of all employees involved is important. Without a solid understanding of the complete system, employees may take action unaware of the detrimental effect that it may have on other aspects of the system. Specifically, slight over-sensitization of HBDs may seem like a very reasonable option to Signals and Communications (S&C) technicians since, from their perspective, they are increasing the safety margin of the system. However, this action can result in unwarranted alarms to HBOs and train crews, increasing their workload and reducing their trust in the system. Also contributing to the workload of the HBO is the interface for the Devtronics system, which currently does not take into consideration all the task requirements of the HBO (i.e., the number of WIS sites to be monitored, tracking of trains over previous and subsequent WIS sites, identification of car numbers). Further automation of this process in the future could assist in making even better use of WIS data, while reducing employee workload.
$ Testing
The WIS system is designed to detect distressed bearings and wheels by measuring their temperature as they pass by the scanner at train speed and to identify dragging equipment. If the heat level exceeds a pre-determined threshold, an alarm is activated. CN tests its systems monthly in a static state and at a temperature well below the alarm threshold level, with the understanding that, if the system is set up at the testing temperature, it will detect an overheated bearing at the alarm threshold level under the dynamic condition of a passing train. Static testing of the dragging equipment detector (DED) involves a pass/fail functionality test. Dynamic testing is typically conducted semi-annually; however, it does not test DEDs nor does it test at maximum train speeds. In the absence of dynamic testing procedures which incorporate maximum train speeds, the threshold heat levels, and simulation of dragging equipment, there is a risk that the system will not function accurately under all conditions.
$ Field Detection of Emerging Bearing Failures
The Association of American Railroads (AAR)-approved tempilstik normally provided to train crews to aid them in their determination of an overheat condition has significant limitations. This is further compounded by such things as cold ambient conditions (if it is extremely cold or raining) and the time it may take before the task can be performed (if the car is near the end of the train). There presently exist other tools which can assist train crews in this task and provide them meaningful information about bearing temperature. For example, in cases where the suspect bearing is not readily apparent (e.g. a temperature is insufficient to melt the tempilstik), the train crew using a remote (hand-held) infrared temperature gun could perform a comparative analysis in the field
SAFETY ACTION
62 TRANSPORTATION SAFETY BOARD
(i.e. a train-side or car-side average) even if the bearing had cooled down below the melting threshold of the tempilstik. In this way, relative temperatures may indicate which bearing is giving a problem.
- 3
Safety Concern
It is recognized that the majority of railway operations in Canada are monitored by advanced technological means, such as WISs, and that the railways continue to make significant monetary investments to improve their existing systems. However, there still are subdivisions where WISs are installed at intervals in excess of 25 miles, thereby reducing the probability that distressed axle journal bearings will be detected before failure. There are also locations where axle bearing temperatures on passenger trains and/or shipments of dangerous goods are not monitored by WISs at all. Notwithstanding the foregoing, some equipment by its design is ill-suited for bearing temperature detection by WISs, irrespective of the detector spacing. Although axle failures are rare, there can be severe adverse consequences associated with such an event resulting in a risk to persons, property, and the environment. The Board is concerned that, without an industry standard that will detail the frequency and adequacy of roller bearing inspections, there may be less-than-adequate protection against the catastrophic failure of railway axles in some operational settings.
This report concludes the Transportation Safety Board=s investigation into this occurrence. Consequently, the Board authorized the release of this report on 26 March 2001.
APPENDICES
TRANSPORTATION SAFETY BOARD 63
Appendix A - Examination of Tank Cars Involved in Fire
Three of the tank cars involved in the post-derailment fire arrived at Procor in Sarnia, Ontario, on Wednesday, 30 March 1999. On Tuesday, 06 April 1999, the cars were examined by TSB personnel in Canadian National=s Sarnia Yard and the following was noted:
Car CN 668016 (an 89-foot flat car) loaded with tank car AGEX 1001:
$ residue car, last contained benzene, UN 1993, presently empty clean car $ built date, new 09/81 $ emergency response phone number: 1-800-561-6682 $ DOT-111A100W-1 $ safety valve tested in 1991, due in 2001 at 75 pounds $ tank tested in 1998, due in 2003 at 100 pounds per square inch (psi)
Tank car damage:
$ B-end stub sill heavily damaged, bent upwards and twisted $ bolster on the right side collapsed, crushed and torn $ bolster on the left side bent and twisted $ A-end stub sill missing $ bolster on the right side bent, twisted and torn $ bolster on the left side missing $ end framing on A-end and B-end missing (hand rails, crossovers, sill steps, etc.) $ tank head on the left side of the B-end dented inwards approximately 24 inches deep by 4 feet 7 inches long by 5 feet wide $ tank head on the right side of the B-end dented inwards approximately 16 inches deep by 6 feet 4
inches long by 3 feet wide
Inside the dented area, there appears to have heavy scrape marks starting from the head centre to the outer side dimension of the head. At this point, contact was made with the weld joining the head to the tank shell, tearing a hole in the side of the tank shell approximately 18 inches long by 5 inches wide. This hole appears to be the result of tearing the side shell away from the head as opposed to a puncture. The metal is piled up and outwards from the hole as opposed to shoved inwards as you would expect from a puncture. The gouges in the dented diameter of the head vary from 4 inches to 6 inches apart and are possibly caused by a rail. $ the tank head on the left side of the A-end and along the side of the shell dented inwards
approximately 16 inches deep by 4 feet 6 inches long by 2 feet 8 inches wide
A hole inside this dent approximately 2 feet long by 1 foot wide is triangular in shape and appears to be that of a puncture. The metal from around the circumference of the hole is pushed inwards into the body of the tank shell. $ the entire car was mostly void of paint as a result of being engulfed in flames
APPENDICES
64 TRANSPORTATION SAFETY BOARD
$ trucks, wheels and brake rigging were missing
Car CN 668189 loaded with tank car PROX 41841:
Tank car damage:
$ A-end stub sill missing $ bolsters on the right and left sides of the A-end bent and twisted $ bolsters on the right and left sides of the B-end bent, twisted and torn $ heavy denting 10 inches deep along the whole left side of tank shell $ fire impingement at the right side of the A-end and at car centre upwards towards the top of the car $ end framing bent, twisted and torn $ tank shell dented inwards along the right side through the entire length of the tank shell $ brake rigging destroyed $ trucks, wheels and brake rigging missing
Car CN 639954 loaded with tank car ACFX 71216:
Tank car damage:
$ stub sill twisted at the B-end $ end framing bent and twisted $ bolsters at the right and left sides of the B-end twisted and bent $ heavy fire impingement along the right and left sides of the A-end and A-end head $ end framing at the A-end bent $ brake rigging destroyed $ heavy denting in tank head at the A-end $ trucks, wheels and brake rigging missing
APPENDICES
TRANSPORTATION SAFETY BOARD 65
Appendix B - General Roller Bearing Information
Roller bearings are pressed onto the ends of railway axles outside of the wheel plate area. There are typically eight roller bearings per car, one on each end of the four axles. Roller bearings are of a tapered design and support the weight of the rail car and its contents on the rail. The bearing is positioned within a pedestal jaw of a truck side frame. The moving parts of the roller bearing allow the solid wheel/axle combination to which it is attached to rotate with little friction.
The Association of American Railroads (AAR) requires new roller bearings to be built with an L10 life 24 of 1,000,000 miles. Bearing manufacturers typically warrant their new bearings from an initial application to between 500,000 and 600,000 miles. Roller bearings are requalified at AAR-certified wheel shops during their life. As a wheel profile either wears out or experiences some type of defect every 200,000 to 300,000 miles, the roller bearings are inspected and can be requalified and returned to service several times before their internal parts are no longer serviceable. Disregarding special or severe service applications, it is not uncommon for a roller bearing to last 15 years without service problems, and 30 years when spanning multiple axle applications.
Roller bearings typically run at a temperature of 40F above ambient during the winter, and 60F above ambient during the summer (120F to 160F absolute). Bearings on many locomotives typically run 20F hotter, mainly due to truck design. Standard freight and passenger locomotives often use either Class GG tapered roller bearings or Hyatt cylindrical roller bearings. These bearings are specially designed for locomotive use and incorporate high load-rated components due to the additional forces involved.
A steady state temperature in excess of 160F is considered to reduce the overall life of a bearing due to grease degradation. Continuous operation at high temperatures over 200F reportedly causes premature aging of the rubber sealing elements, and oxidation of the lubricant; at 240F, grease breakdown and seal elastomer degradation occurs. In general, the life of a bearing will be diminished with increased operating temperature. This is due to the reduction in oil viscosity, and consequently, the reduction in film strength of the lubricant.
Conversely, severe cold can delay the ability of a bearing to reach the operating temperature. Some greases can become stiff at sub-zero temperatures, to the point that the grease does not migrate through the bearing and provide critical initial lubrication. Depending on the mechanical properties of the grease, the minimum temperature recommended for bearing startup by roller bearing manufacturers is approximately minus 40F.
24 L10 life is a statistical number wherein 10 per cent of the bearings are expected to fail given a standard set of laboratory conditions. It is not the expected life of the bearings in an actual railway environment. Two of the major roller bearing manufacturers were asked to provide the recommended temperature settings at which they would want their bearings identified by a hot box detector (HBD) as overheating. One stated 195F absolute, while the other stated 180F to 190F absolute.
APPENDICES
66 TRANSPORTATION SAFETY BOARD
Appendix C - Comparison of Various Reference Manuals Relating to the WIS
Source
Date
Text
Rolling Stock
Type
Maximum
Absolute
Maximum
Differential
TP-105
1993
Hot Bearing Criteria
Locomotives
15 mm
7 mm
Passenger Cars
15 mm
not calculated
Roller Bearings
15 mm
8 mm
Plain Bearings
8 mm
4 mm
Warm Bearing Criteria
Locomotives
12 mm
5 mm
Passenger Cars
12 mm
not calculated
Roller Bearings
12 mm
6 mm
Plain Bearings
6 mm
- 5 mm
WIS Manual (Servo)
May 1995 pages 2 to 30
Advance Warning Alarm
Roller Bearings
17 mm
10 mm
Plain Bearings
11 mm
9 mm
Devtronics
Hot Bearing
Roller Bearings
15 mm
10 mm 25
Plain Bearings
15 mm
10 mm
Warm Bearing
Roller Bearings
12 mm
6 mm
Plain Bearings
12 mm
6 mm
Internal S&C Directive
October 1998
Hot Bearing
Roller Bearings
15 mm
8 mm
Warm Bearing
Roller Bearings
12 mm
6 mm
WIS Manual (Servo)
May 1995 pages 7 to 22
HBD Calibration Values
Temperature of function simulatorC130F +/- 3F
Should produce desired output of
25 The Devtronics software uses the correct value of 8 mm as the criterion for the differential.
APPENDICES
TRANSPORTATION SAFETY BOARD 67
Source
Date
Text
Rolling Stock
Type
Maximum
Absolute
Maximum
Differential 12 mm
S&C WIS Manual
May 1995 pages 5 to 10
HBD Calibration Values
Set the function simulator to 135F above ambient
Heat received on both rails should be 10 mm to 12 mm
APPENDICES
68 TRANSPORTATION SAFETY BOARD
Appendix D - Examples of Subdivisions with Passenger Train Service and HBD Spacing Exceeding 25 Miles
Note: Subdivisions shown do not all belong to CN
Province
Subdivision
Spacings in
Excess of
25 Miles
Total
HBDs
Total Miles
Passenger
Service
Nova Scotia and New Brunswick
Bedford and Springhill
2 HBDs spaced 31.8 and 29 miles apart
7
190
6 days a week
Quebec
Wacouna and Northern Land - Quebec North Shore and Labrador (QNS&L)
4 spaced 30 miles apart
10
- 8
twice weekly
Menehek - QNS&L
not applicable
No HBDs
- 2
once a week
La Tuque
2 HBDs for 125 miles
2
- 4
6 days a week
Saint-Maurice
4 HBDs for 256 miles
4
256
6 days a week
Lac-Saint-Jean
4 HBDs for 201 miles
4
201
6 days a week
Mont-Joli - Chemin de fer de la Matapédia et du Golfe (CFMG)
not applicable
No HBDs
- 8
6 days a week
Chandler and Cascapédia - Corporation des Chemins de fer de la Gaspésie (CCFG) and Chemin de fer Baie des Chaleurs (CFBC)
not applicable
No HBDs
130
4 days a week
Drummondville
2 HBDs (one 26.4 miles and one 25.5 miles apart)
5
- 1
numerous high-speed trains daily
Kingston
5 HBDs spaced between 25 and 30 miles between Coteau and Kingston
15
- 8
numerous high-speed trains daily
Ontario
Chatham
1 HBD for
1
- 5
daily service
APPENDICES
TRANSPORTATION SAFETY BOARD 69
Province
Subdivision
Spacings in
Excess of
25 Miles
Total
HBDs
Total Miles
Passenger
Service 70.5 miles and 1 for 28 miles
Newmarket
1 HBD located near Trout Creek
1
- 4
commuter service between Toronto and Bradford
Uxbridge
not applicable
No HBDs
20
commuter service
Brockville - Canadian Pacific Railway (CPR)
not applicable
No HBDs
27
daily LRC service
Guelph - Goderich & Exeter Railway (GEXR)
1 spaced 46.3 miles apart
3
- 9
daily LRC service
Manitoba
Rivers
3 spaced 28.9, 28.9 and 26.8 miles apart
14
- 3
6 days a week
Watrous
4 HBDs (spaced between 26.9 and 27.8 miles apart)
11
- 3
6 days a week
Gladstone
2 HBDs (one 27.4 and one 59.0 miles apart)
3
- 7
6 days a week
Togo
2 HBDs (one 28.9 and one 58.9 miles apart)
3
- 9
6 days a week
Assiniboine
not applicable
No HBDs
- 2
6 days a week
Turnberry
not applicable
No HBDs
- 4
6 days a week
Wekusko - Hudson Bay Railway (HBR)
not applicable
No HBDs
- 4
6 days a week
Thicket - HBR
not applicable
No HBDs
- 7
6 days a week
Herchmer - HBR
not applicable
No HBDs
- 7
6 days a week
Flin Flon - HBR
not applicable
No HBDs
- 3
4 days a week
Sherridon - HBR
not applicable
No HBDs
- 8
4 days aweek
Alberta/ Saskatchewan
Wainwright
5 HBDs (4 spaced 29.4 and 29.6 miles
10
- 3
6 days a week
APPENDICES
70 TRANSPORTATION SAFETY BOARD
Province
Subdivision
Spacings in
Excess of
25 Miles
Total
HBDs
Total Miles
Passenger
Service apart)
British Columbia
Fraser
all greater than 25 miles apart
5
- 1
6 days a week
Nechako
1 spaced 27.2 miles apart
5
- 4
6 days a week
Telkwa
1 spaced 27.3 miles apart
4
- 2
6 days a week
Bulkley
2 HBDs spaced 27.1 miles apart
5
- 9
6 days a week
Skeena
2 HBDs spaced 28.9 and 29.3 miles apart
3
- 6
6 days a week
Mountain - CPR
1 spaced 25.1 miles apart
6
- 7
6 days a week
Cascade - CPR
1 spaced 25.2 miles apart
5
- 1
6 days a week
New Westminster - Burlington Northern Santa Fe Corporation (BNSF)
not applicable
No HBDs
- 7
daily service
Other areas of interest are the mileages between the last HBD on one subdivision, and the first HBD on the next subdivision. In some places, these distances also exceed 25 miles and there are no longer any train stops for the passenger trains at the station separating the two subdivisions. In other areas, passenger trains operate over portions of several subdivisions and can travel considerable distances before being inspected by an HBD; e.g., VIA Rail Canada Inc. and the Great Canadian Railway Company (Rocky Mountaineer) operate over portions of subdivisions on three different railways as they depart the Vancouver area travelling eastward. These trains travel a distance of 30.7 miles between HBD inspections.
APPENDICES
72 TRANSPORTATION SAFETY BOARD
Appendix E - Observations of WIS Equipment on Other Railways
To acquire a better understanding of Canadian National=s (CN) Wayside Inspection System (WIS) as compared to other railway installations, a brief review was made of WIS equipment on Canadian Pacific Railway (CPR), Quebec North Shore and Labrador (QNS&L), and VIA Rail Canada Inc. (VIA), which included site visits in Quebec, Ontario, and Alberta. As a result of these visits, the following observations were made:
CPR $ CPR does not test its hot box detectors (HBDs) dynamically. $ CPR has a higher alarm threshold criterion. $ CPR does not use multiple alarm thresholds. $ CPR has integrity check capability on its HBDs which verifies integrity after every scan. $ CPR has newer Servo hardware than CN. $ CPR does not have a journal advance warning signal (JAWS) system where it captures previous HBD history and compares it to the car repair record history. $ CPR has a more homogenous and simpler system. $ CPR tests its HBD system at alarm criteria. $ CPR has undergone a program to re-align its hot wheel detectors (HWDs) so that they scan 90 degrees to the rail, with the intent of alternating the location of the scanner from the north rail to the south rail. Scanning at 90 degrees to the rail as opposed to 45 degrees reduces the chance that the scanner will incorrectly read elevated temperatures from the wheel tread area as the wheel rolls into and out of view. When positioned this way, one HWD can only scan those wheels on the closest rail to the scanner (as opposed to scanning wheels on both rails with a 45-degree set-up).
QNS&L $ QNS&L uses a variety of Servo and Sentry equipment. It has one Cyberscan site under test. $ QNS&L has more than twice the number of dragging equipment detectors (DEDs) and HBDs, and has the DEDs set up separately from the HBD sites (at other locations). $ Most of QNS&L=s WIS sites are equipped with automatic equipment identification (AEI) readers for accurate car identification. $ The HBD sites communicate directly to the train crew through a talker system, and directly to the rail traffic controller (RTC) in paper format. A printed Aexception@ form automatically prints in the rail traffic control and maintenance offices when an alarm threshold is exceeded.
APPENDICES
TRANSPORTATION SAFETY BOARD 73
VIA $ VIA contracts out all its track and signal work to Rail Term, a Montréal-based company. $ Rail Term employs two Signals and Communications (S&C) maintainers who perform most of VIA=s signal- and WIS-related inspection and maintenance work for the three WIS sites and 76 crossing systems on the VIA-owned Alexandria and Smiths Falls subdivisions (from Coteau, near Montréal, to Ottawa, and Ottawa to Smiths Falls). $ One of the two S&C maintainers had not received a training course specific to HBDs. This maintainer was responsible for inspecting and maintaining two of the three WIS sites on VIA=s Alexandria Subdivision, which handles approximately eight passenger and two freight trains most days of the week. $ Rail Term S&C employees did not understand well how the different components of the WIS system worked; i.e., HBDs, HWDs, and DEDs. They did not know the alarm levels, and did not have a good understanding of how the overall system functioned, or all the consequences with any changes they may make between sites. $ There are no HBDs on the Smiths Falls Subdivision, which handles approximately eight passenger trains most days of the week. $ None of the VIA passenger car equipment that is equipped with journal bearings (which is more than half its total fleet) is equipped with an on-board heat detection equipment. VIA relies on the WIS sites on the railways where it operates, where so equipped, to detect overheating bearings. $ Subsequent to the axle failure involved in the VIA derailment at Biggar, Saskatchewan, VIA removed, in 1998, all journal hot bearing sensors from its General Motors locomotives that were so equipped. The decision was based partially on the belief that the removal poses no greater threat to safety than that presented by the other half of its fleet that never had these sensors, and virtually all the freight locomotives that do not have them. Only the seven remaining Bombardier locomotives which are rated for 100 mph are equipped with on-board heat detection equipment for journal bearings. $ VIA passenger trains had two hot boxes on the Kingston Subdivision in 1999; one on the journal of a Light, Rapid, Comfortable (LRC) locomotive; the other on the journal of a coach car. Examination of the axles at the VIA maintenance centre revealed that both hot box indications were genuine. According to VIA, for one of the occurrences, ACatastrophic failure of the #4R journal bearing was narrowly averted.@ $ In 1996, a head-end power (HEP) car experienced a bearing failure just after passing a CN HBD with no warning. When examined later by VIA officials, it was noted that the stink bomb had not gone off completely; yet, the bearing had completely melted away.
APPENDICES
74 TRANSPORTATION SAFETY BOARD
$ A number of VIA train tapes were run for the two operative WIS sites visited on the Alexandria Subdivision. It was observed on a couple of the tapes that the locomotive journal bearings were showing no heat, similar to the pedestal pulses on the LRC cars 26. $ One of the three WIS sites on the Alexandria Subdivision was out of service for approximately two months waiting for parts. (The Moose Creek site was equipped with an HBD, an HWD, and a DED and was out of service for June and July.) On 08 June 1999, the Rail Term RTC in Outremont, Quebec, issued a Daily Operating Bulletin (DOB) to railway crews advising them that the HBD was out of service. On 24 June 1999, one day after the TSB visit to the Alexandria Subdivision, another DOB was issued advising train crews that both the HBD and DED were out of service. Neither bulletin advised train crews that the HWD was also not in service.
As a result of the differences noted with the different Canadian railway systems (i.e. the hardware used, and how it is set up, maintained and tested), the TSB review was extended to some of the other major Class 1 carriers in the U.S. (Burlington Northern Santa Fe Corporation (BNSF), Union Pacific/Southern Pacific (UPSP), CSX Corporation (CSX)). The following table shows the results of the TSB observations, and highlights some of the differences noted with the various installations of WISs.
The railways have similar operating environments (allowances made for passenger or freight service, or extreme differences in gross ton-miles, etc.). Each railway designs its HBD system to protect against the same problem (i.e. complete axle failure); however, as can be seen from the data in the following table, the manner in which each does so differs.
26 LRC passenger cars do not have external journal bearings on their axles. As the HBD scanners are located on the field side of the rail, there is no journal to scan and the output tape is typically a Aflat line@ at the pedestal value level of 1.8 mm. Trained personnel immediately recognize such output tapes, combined with the length and speed of train, to be an LRC train.
APPENDICES
TRANSPORTATION SAFETY BOARD 75
Other Class 1 Railways (U.S. and Canada)
Class 1 - A
Class 1 - B
Class 1 - C
Class 1 - D
CN
Typical Spacings on Core Routes
20 miles +/- 5 miles
20 miles
25 miles
25-30 miles
15-20 miles
Basic Set-up
Stand Alone
Stand Alone and Central Monitoring
Stand Alone
Stand Alone
Stand Alone and Central Monitoring
Alarm Criteria:
- HBD
Absolute (Above Ambient)
Differential
Car/Car Side (Ratio)
HWD (Above Ambient)
180F
120F
- 60
650F
180F
117F
- 00
800F
195F
135F
- 3
None
130F
120F
N/A
600F
170F (180F Sentry)
100F (120F Sentry)
Devtronics
558F 27
HBDs Tested Dynamically
No
Yes
Yes, with TEST car
No
Yes, with 210F and 170F
Calibration Temperatures
Servo 130F>ambient Sentry 180F>ambient
Servo 126F>ambient Sentry 180F>ambient
Servo 130F>ambient Sentry N/A
Servo 130F>ambient Sentry N/A
Servo 135F>ambient Sentry 135F>ambient
27 If an HWD site loses communication with the rail traffic control office, the criterion reverts to 514F. Normally, the criterion is set for 300F as a Awarm@ wheel, and 558F for a Ahot@ alarm wheel. None of the CN Southern Technologies Corporation sites (Sentry) are equipped with an HWD.
APPENDICES
76 TRANSPORTATION SAFETY BOARD
Appendix F - List of Supporting Reports
The following TSB Engineering Branch Report was completed:
LP 109/99 - Wheels/Axles and Bearing Examination - R99T0031
This report is available upon request from the Transportation Safety Board of Canada.
APPENDICES
78 TRANSPORTATION SAFETY BOARD
Appendix G - Glossary
AAR Association of American Railroads ACGIH American Conference of Governmental Industrial Hygienists AEI automatic equipment identification AWA advance warning alarm BNSF Burlington Northern Santa Fe Corporation BOJ burnt-off journal CCFG Corporation des Chemins de fer de la Gaspésie CFBC Chemin de fer Baie des Chaleurs CFMG Chemin de fer de la Matapédia et du Golfe CN Canadian National CPR Canadian Pacific Railway CROR Canadian Rail Operating Rules CSX CSX Corporation CWR continuous welded rail DED dragging equipment detector DOB Daily Operating Bulletin DPU data processing unit EPA Environmental Protection Agency EST eastern standard time F Fahrenheit GEXR Goderich & Exeter Railway GM General Motors GOI General Operating Instructions HB hot bearing absolute deflection HBD hot box detector HBO hot box operator HBR Hudson Bay Railway HD hot bearing differential HEP head-end power HWD hot wheel detector JAWS journal advance warning signal km/h kilometre per hour LEL lower explosive limit LPG liquefied petroleum gas LRC Light, Rapid, Comfortable mm millimetre mph mile per hour NIOSH National Institute for Occupational Safety and Health ppm part per million psi pound per square inch
APPENDICES
TRANSPORTATION SAFETY BOARD 79
QC Quality Control QNS&L Quebec North Shore and Labrador RAC Railway Association of Canada RSA Railway Safety Act RTC rail traffic controller RTC Mech rail traffic control mechanical service representative S&C Signals and Communications STC Southern Technologies Corporation TC Transport Canada TSB Transportation Safety Board of Canada UEL upper explosive limit UPSP Union Pacific/Southern Pacific U.S. United States VIA VIA Rail Canada Inc. WB warm bearing absolute deflection WD warm bearing differential WILD wheel impact load detector WIS Wayside Inspection System W2 warm bearing based on a comparison of each pulse on a particular side of a train with the average of all pulses on that side of the train W3 warm bearing based on a ratio of the highest pulse recorded on each side of every individual car to the average remaining pulses on that side of the car degree
FD06086 | 1999_加拿大运输安全委员会_CN苯罐车脱轨起火_R99T0031_火灾报告(英文).md
分类:06_境外及港澳台调查报告 | 年份:1999 | 地域: | 严重程度: | 场所: | 起火原因:燃气/爆炸 | 来源格式:md
1. 标题与报告编号
- 标题:Derailment — Canadian National train No. CN M-304-41-05(Railway Investigation Report R99T0031)
- 报告编号:R99T0031
2. 机构与发布日期
- 机构:Transportation Safety Board of Canada(TSB)
- 事故日期:1999 年 2 月 6 日
3. 事故摘要
- 日期/地点:1999 年 2 月 6 日约 1628 EST;Mile 248.5, Ruel Subdivision, Neswabin, Ontario
- 事件:CN 东行货运列车 M-304-41-05 脱轨 20 辆车(机车后第 21–40 位)。一辆苯混合物罐车(AGEX 1001)被刺穿,导致 "火灾与产品全损";液苯与木材助燃 "持续数日的大火"。装载 LPG 罐车外壳烧焦未泄漏。偏远地点降低公众风险;无伤亡。
4. 原因 / 发现
- 失稳源于车 CN 604697 的 "烧断轴颈(burnt-off axle journal, BOJ)"(L-3 位置),轴承过热卡死致车轴断裂。
- Oba 的 WIS 检测第 95 轴异常(热轴承、热轮、拖挂设备),但 DED 已停用;Edmonton HBO/RTC Mech 误判 tape 为"故障",依 RTC Mech 结论令列车继续前行。
- "TP-105 协议 … 未遵循",未比对 MacDuff 该车的 warm bearing 记录。
- 物理与电子监测局限:wayside 仅北侧;tempilstik 低温难辨早期过热;WIS 无法可靠扫描所有轴承。
5. 安全行动
- 建议规范 HBO 与 RTC Mech 权责及冲突解决程序,避免"final authority"混淆。
- 强化 WIS 月度/动态测试(现 monthly test 仅 135°F above ambient,未达 180°F 报警阈值)。
- 补明手册:指导识别"指示脱轨轮损坏站点"的 tape。
- 监管缺位:TC 无 WIS 安装/校准/审计要求,建议建立最低导则。
FD06087 | 2002_加拿大运输安全委员会_加拿大航空_B767后货舱起火_A02O0123_火灾报告(英文).md
分类:06_境外及港澳台调查报告 | 年份:2002 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:md
1. 标题与报告编号
- 标题:Aviation Investigation Report A02O0123(Cargo Bay Fire, Air Canada, Boeing 767–300 C–GHML)
- 报告编号:A02O0123
2. 机构与发布日期
- 机构:Transportation Safety Board of Canada(TSB)
- 发布:2004 年 8 月 26 日;事发 2002 年 5 月 13 日
3. 事故摘要
- 地点:Toronto/Lester B. Pearson International Airport, Ontario(Vancouver→Toronto 最后进近约距机场 10 英里)
- 事件:Flight 116(8 机组、177 乘客)2132 UTC 收到 后货舱火警;按检查单释放货舱灭火瓶,火警灯约 50 秒后灭。着陆后红外未探明火但嗅烟;开后货舱见大量烟,再循环风扇处热源。后续航司维修发现货舱地板下 大量烟炱与火损。起因后货舱 bilge 隐蔽火,B110 加热带失效引燃,突破 Class C 货舱衬板至侧壁不可及区。无伤亡。
4. 原因与结论
- 致因:
- B110 heater ribbon 附着于供水管,在近期水管修理处失效,电弧引燃周边。
- 热声绝热材的 PET 包覆材料受污染,提供燃料。
- 开启的货舱地板形成陷阱收集污染物与碎屑,助长火势。
- 电路保护器仅护线缆,未及时断电致加热带持续电弧。
- 风险:封闭区无火警/灭火、污染与老化影响未知、加热带安装指引模糊。
5. 安全行动
- Air Canada:机队检查拆除/停用缺陷加热带;96 小时清 Debris;强化记录器隔离程序。
- Boeing:发 ASB 767-30A0037 清 FOD 及检加热带;后推新 Adel Wiggins 加热带设计。
- TSB:发建议 A02-04(降加热带火险)、A02-05(降污染绝热材火险)。
- FAA:AD 2002-11-11 interim;拟 EZAP 除絮尘。Transport Canada:协同 FAA 发 MSI 42 检污染,推国际标准。
FD06088 | 2005_加拿大运输安全委员会_阿拉斯加_B737-900右发动机尾管起火撤离_A05W0222_火灾报告(英文).md
分类:06_境外及港澳台调查报告 | 年份:2005 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:md
加拿大 TSB | Alaska Airlines B737-900 右发动机尾管起火撤离调查(A05W0222)
基本情况 / Incident summary
- 时间:2005年10月30日(首班飞行 07:00 MST)
- 运营方/机型:Alaska Airlines Boeing 737-900,N317AS,自卡尔加里(YYC)飞往洛杉矶(LAX)。
- 事件:左发正常启动后启动右发,启动过程中右发动机从尾喷管喷出大量火焰与烟雾,烟雾进入后客舱。发动机停车,113 名乘客经左侧两主门应急滑梯撤离(远离右发尾管火)。消防到场时火已熄灭。无人员受伤。
原因 / Cause and findings
初步检查确认火灾局限于发动机流道内(CFM56-7B26,序列号 890392),发动机与机体结构均无损伤。
安全提示
强调发动机启动阶段尾管火的风险与乘客应急撤离组织。
FD06089 | 2009_加拿大_TSBC_R09H0010_Locomotive_Engine_Fire_VIA_Rail_Richmond_2009.pdf
分类:06_境外及港澳台调查报告 | 年份:2009 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
RAILWAY INVESTIGATION REPORT R09H0010
LOCOMOTIVE ENGINE FIRE
VIA RAIL CANADA INC. PASSENGER TRAIN 46 MILE 14.26, SMITHS FALLS SUBDIVISION RICHMOND, ONTARIO 16 AUGUST 2009
The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability.
Railway Investigation Report
Locomotive Engine Fire
VIA Rail Canada Inc. Passenger Train 46 Mile 14.26, Smiths Falls Subdivision Richmond, Ontario 16 August 2009
Report Number R09H0010
Summary
On Sunday, 16 August 2009 at 2005 Eastern Daylight Time, the locomotive diesel engine of VIA Rail Canada Inc. passenger train 46 caught fire while the train was travelling eastward at about 95 mph. A loss of power caused the diesel engine to shut down and the brakes to apply. The train came to a stop at Mile 14.26 of the Smiths Falls Subdivision, near Richmond, Ontario. A total of 323 passengers were evacuated. There were no serious injuries to the passengers; however, one of the locomotive engineers required medical attention for exposure to smoke and fumes.
Ce rapport est également disponible en français.
- 2 -
Other Factual Information
On 16 August 2009, VIA Rail Canada Inc. (VIA) passenger train 46 (the train), which operates daily eastward 1 between Toronto, Ontario, and Ottawa, Ontario, was comprised of one locomotive (VIA 902) and five light, rapid, comfortable (LRC) passenger cars. The train weighed 373 tons and was 495 feet in length. The train crew consisted of two locomotive engineers and five on board services (OBS) personnel who were located throughout the train.
At 2005, 2 while travelling at 95 mph and approaching Richmond, Ontario, on VIA’s Smiths Falls Subdivision (see Figure 1 and Figure 2), the train experienced a loss of power. An unsuccessful attempt was made to restore power. Shortly thereafter, smoke and flames came from the engine compartment on the locomotive. There was no fire detection system in the engine compartment of this locomotive. The emergency fuel cut-off switch was then activated by the crew.
When the locomotive shut down, the train brakes applied automatically. At 2008, with the train stopped at Mile 14.26, the rail traffic controller (RTC) was notified of the situation. Shortly thereafter, VIA Operations Control Centre (OCC) was also advised.
Smoke started to migrate to the passenger cars and the lights inside the cars flickered. An evacuation towards the rear of the train was initiated. As per standard operating procedures, the heating, ventilation and air conditioning (HVAC) system on all cars was shut down.
Figure 1. Incident location on the Smiths Falls Subdivision (Source: Railway Association of Canada, Canadian Railway Atlas Figure 2. Incident location on the Smiths Falls Subdivision (Source: Google)
1 All directions are per timetable. 2 All times are Eastern Daylight Time.
- 3 -
Both locomotive engineers detrained. With the use of a fire extinguisher, burning debris under the fuel tank and a small fire on the side of the locomotive were extinguished. However, due to the intensity of the fire inside the engine compartment of the locomotive, the crew was unable to extinguish this fire. The engine fire remained burning for at least 15 minutes and then went out on its own before firefighters arrived.
Smiths Falls Subdivision
The Smiths Falls Subdivision is owned by VIA. It is single main track between Mile 0.0 at Federal (Ottawa) and Mile 34.5 at Smith Falls East. Train movements in the vicinity of the occurrence are governed by the Occupancy Control System (OCS) method of train control, as authorized by the Canadian Rail Operating Rules (CROR) and supervised by a RailTerm RTC located in Dorval, Quebec. The authorized timetable speed in the vicinity of the occurrence was 95 mph for passenger trains. Approximately 8 to 10 passenger trains traverse the subdivision on a daily basis.
Crew Information
The two locomotive engineers were qualified for their respective positions and met company and regulatory fitness and rest standards. One locomotive engineer was designated as the in-charge locomotive engineer (ICLE) and the second as locomotive engineer. The OBS personnel consisted of one service manager 3 and four senior service attendants who were all qualified for their respective positions and met company and regulatory standards. 4 All OBS crew members were able to speak both official languages.
Post-Occurrence Examination of VIA 902
VIA 902 was a Genesis P42 locomotive manufactured by General Electric (GE). It entered into service in 2001. Post-occurrence examination of the locomotive determined that the fire started at the top of the L2 power assembly of the V-16 diesel engine (see Figure 3).
Figure 3. Genesis P42 locomotive showing location of L2 power assembly
3 The service manager is responsible for coordinating the activities of the OBS personnel. 4 Railway Passenger Handling Safety Rules, November 2001.
- 4 -
A broken high-pressure fuel injection line that connected the fuel injection pump with the fuel injector was discovered. Two of the four fuel injection pump mounting bolts were broken and the O-ring gasket at the base of the fuel injector pump was damaged.
The broken high-pressure fuel injection line, the four mounting bolts, the fuel injector pump and the damaged O-ring gasket were sent to the TSB Laboratory for analysis (LP 121/2009).
Laboratory Analysis of Fuel Injector Pump
Laboratory analysis of the fuel injector pump and associated securement and connecting components determined the following:
Fuel Pump Mounting Bolts (see photos 1 and 2)
The mounting bolts used to fasten the L2 fuel injector pump to the cylinder were the original bolts that had been installed during factory assembly.
The fuel injector pump front mounting bolts (left and right) failed due to progressive (high-cycle fatigue) cracking.
The fatigue cracks advanced in different intersecting directions, which was most obvious in the case of the front right mounting bolt (see Photo 2).
No discrepancies were found when compared with the mounting bolt specifications (that is, dimensions and material).
O-Ring Gasket (see Photo 3)
A portion of the rubber O-ring gasket had jammed between the pump base plate and the cylinder seat. There were scrapes and small cuts along half of the outside surface of the gasket, including a 15 mm longitudinal tear and a 10 mm missing portion.
High-Pressure Fuel Injection Line (see Photo 4)
Subsequent to the bolt failure, the fuel pump-to-cylinder joint became loose, leading to the development of fatigue cracks in the high-pressure fuel injection pipe.
The fuel injection line broke in overstress mode due to the reduction of its load- bearing cross-section.
- 5 -
Photo 1. Fuel injector pump mounting bolts Photo 2. Front right mounting bolt for fuel injector pump Photo 3. Damaged O-ring gasket Photo 4. Broken fuel injection line
Mechanical Inspection of Locomotives
On 17 April 2008, VIA 902 underwent an “H” maintenance inspection (that is, required every 547 days) as per VIA maintenance procedure P142/0129 at the Montréal Maintenance Centre (MMC). During this maintenance procedure, the O-ring gasket was replaced on all fuel injector pumps. To facilitate O-ring gasket replacement, pump installation procedures state (in part):
Remove the mounting bolts at the base of the pump using the special wrenches. Lift the pump from the engine. Remove and discard the square cut O-ring from the groove in the jacket. Ensure groove is clean and free of all foreign matter.
Inspect the removed O-ring for indication of installation error, (e.g., pinched between pump mounting base and cylinder jacket or double gaskets). If any error is apparent, discard the mounting bolts.
- 6 -
AN IMPROPERLY SEATED O-RING MAY CAUSE FUEL-OIL LEAKAGE AND/OR MOUNTING BOLT FAILURE, RESULTING IN A FUEL-OIL INTEGRITY ISSUE.
Apply a new sealing square cut O-ring to the pump mounting cavity groove and ensure it seats squarely and fully into the groove.
Install the pump on the cylinder taking care not to displace the O-ring from the groove.
Install the mounting bolts and torque to 114-126 Nm 5 (83-93 ft-lbs) in a criss-cross pattern in 41 Nm (30 ft-lbs) increments. Use the special GE wrench 147X2460.
Mark torqued bolts with a grease stick.
During this maintenance procedure, adjustment of the fuel injector pumps was also performed. The fuel injector pumps were removed, timing was checked, and the fuel injector pumps were reinstalled. This was the last mechanical maintenance procedure conducted on the fuel injector pumps before the occurrence.
On 13 August 2009, three days before the occurrence, VIA 902 underwent a “C” maintenance inspection (that is, required every seven days) at the VIA MMC. This maintenance procedure (P142/003) involved inspection of the fuel injector pump assembly (see Figure 4). During this activity, any identified leaks should be corrected by tightening the connections, renewing gaskets or seals and replacing defective components as required. During the August 13 “C” inspection, no anomalies related to the fuel injector pump assembly were noted.
On 30 September 2009, at the MMC, TSB investigators observed the installation of a new fuel injection pump on a VIA locomotive. During this installation, it was noted that, while the mounting bolts were torqued in a criss-cross pattern, the requirement to tighten the mounting bolts in 30 ft-lbs increments was not followed. Instead, 90 ft-lbs of torque was applied to each mounting bolt individually.
5 newton-metres
- 7 -
Figure 4. Schematics of the fuel pump-to-cylinder attachment (adapted from GE Parts Catalog PBE-93342-006D). Items 3, 6a and 7 were the failed components.
Passenger Evacuation and Emergency Response
During the evacuation of the train, no announcements could be made over the public address (PA) system due to the loss of power within the train. OBS personnel in each car directed the passengers towards the rear of the train and instructed them to leave their luggage behind. Some instructions were given in English and some in both official languages. When answering questions from passengers, responses were provided in the language that the question was asked.
With no side doors on the car at the rear end of the train, some passengers detrained from the rear door where there were no steps. The distance to the ground was approximately 1 m. The first OBS employee to detrain injured his ankle, but was able to continue assisting passengers with the evacuation. All other OBS personnel remained in their respective car to coordinate the evacuation of passengers.
A passenger was also asked to assist with the evacuation. This person had received a pre-trip emergency briefing because he was an able-bodied passenger who had been sitting near the exit. The assisting passenger and the OBS employee positioned themselves at track level on each side of the rear door as the passengers detrained. Shortly afterwards, when congestion occurred at the rear door, OBS personnel gave instructions to the remaining passengers to exit from the side doors of each passenger car to accelerate the evacuation.
Cylinder
Fuel injection nozzle
Fuel pipe with collars and nuts
Bosch high pressure fuel pump
Fittings for low pressure lines
Twelve-point head bolts: two front (6a) and two rear (6b)
Rubber seal 6a 3 6b
- 8 -
At approximately 2013 (that is, 5 minutes after the train stopped), OBS personnel confirmed that all 323 passengers had detrained. The passengers were then instructed to walk westward on the track to a safe location from the rear of train and to wait for further instructions.
During the evacuation, the trauma kit 6 from each passenger car was accessed and taken from the train. Four flashlights from each of the five trauma kits provided the OBS personnel and passengers with 20 flashlights. Reflectorized arm bands were available for each of the OBS personnel. The trauma kits did not contain insect repellant. A defibrillator and an oxygen canister were also carried separately from the train during the evacuation.
Shortly after the train stopped, the locomotive engineer started walking eastward towards the McBean Street crossing (a distance of 1.37 miles) to meet with the emergency responders and to help coordinate the emergency response. Approximately 20 minutes later, the locomotive engineer arrived at the crossing. The ICLE had stayed at the head end of the train to communicate with the service manager and the RTC. Before the locomotive engineer had departed, the train crew members had agreed to update each other at least every 10 minutes by portable radio. However, they lost contact after their first and only en route communication. To maintain communications during the evacuation and emergency response, the ICLE obtained the service manager’s cellular telephone by walking past the locomotive engine fire and also re-entered the smoke-filled locomotive cab a number of times to use the (more powerful) cab radio.
The McBean Street crossing was established as the staging area. At 2025, a RailTerm maintenance foreman (foreman) arrived at the crossing by hi-rail vehicle. Other railway maintenance personnel in hi-rails arrived shortly after. Emergency first responders began to arrive at 2038. At 2041, the foreman requested a track occupancy permit (TOP) to occupy and use the main track, but was not given authorization until 2053. The RTC was unable to provide authorization until a General Bulletin Order was issued to permit the train crew to leave the train on the main track and the train’s track authorization was cancelled.
Once authorized, the RailTerm personnel transported the emergency responders from the McBean Street crossing to the train. Shortly thereafter, evacuation of the passengers from the site commenced. Hi-rail vehicles were used to transport some passengers to the staging area at the McBean Street crossing, while other passengers walked. Special arrangements were made for some passengers (that is, unaccompanied children). In addition, some passengers with difficulty walking were transported by hi-rail westward to the Kettles Road crossing (approximately 3.5 miles) and then transported to the staging area by ambulance. By about 2330, all passengers and crew had been taken by bus from the McBean Street crossing staging area en route to the designated train stations (Fallowfield and Ottawa). Appendix A presents a detailed timeline for the passenger evacuation and emergency response.
6 A large, self contained first-aid kit with sufficient supplies to permit treatment of multiple injuries.
- 9 -
VIA Rail Canada Inc. Protocols for Emergency Situations Involving Passenger Evacution
VIA emergency response procedures are defined in three manuals:
Guide to On-Train Services (GOTS), Train Emergency Response Plan (TERP), and Emergency Measures Organization (EMO).
OBS personnel are required to have a copy of the GOTS accessible while on duty. This document is the main reference in case of an emergency. The TERP is a supplement to the GOTS. While on the train, OBS personnel have access to the GOTS, but they do not have access to the EMO, which provides additional detail for emergency procedures.
The GOTS has a dedicated section on emergency response procedures. That section indicates that:
OBS personnel are to ensure that evacuation is carried out assertively and safely, and
Calm informative announcements are made in both official languages on a timely basis.
The GOTS does not provide specific wording to be used for an emergency evacuation. The EMO indicates that, for an emergency evacuation, the following announcement should be made:
LADIES AND GENTLEMEN, YOUR ATTENTION PLEASE. FOR YOUR OWN SAFETY, PLEASE LEAVE THIS CAR IN THIS DIRECTION (point the direction).
The GOTS indicates that the service manager can enlist assistance from off-duty employees or passengers if required. The GOTS also stipulates that the marshalling command post should be established at a minimum distance of 300 m from the train.
Pre-Departure Safety Briefings
Before departing the Toronto Union Station, OBS personnel conducted a pre-departure safety briefing. Passengers in each car of the train were also provided a standard announcement on the PA system to inform and encourage them to read the safety pamphlet located in the seat back pocket in front of them. Additionally, for passengers seated next to emergency exits, instruction was provided on how to open the exits in the event of an evacuation.
- 10 -
Rail Traffic Controller Activities
RailTerm has two RTCs on duty for each 12-hour shift during weekend days. There is no on-site supervisor on weekends. The day shift is from 0600 to 1800 and the night shift is from 1800 to
- When an emergency occurs, the on-duty RTC assigned to the territory will normally
handle the additional workload generated by the emergency, as well as perform his or her regular duties. If required, the supervisor can be contacted and can assist from home because he or she has full information access. The supervisor can also choose to return to the office to assist. Common practice in larger rail traffic control centres is for the on-site supervisor to assist in times of heavy workload such as during emergencies.
During the 45-minute period after being notified of the occurrence, the RTC was occupied for about 40 minutes with tasks directly related to this occurrence and for about 2 minutes with other RTC tasks (see Appendix B). He handled a total of 27 individual telephone or radio conversations in this period. Just before the incident, the RTC was handling 6 train movements on all territories under his authority. The second RTC answered some of the phone calls, but would place the calls on hold until the occurrence RTC was available.
Emergency Lighting in Passenger Cars
After auxiliary power from the locomotive shut down, emergency lighting in the passenger cars came on and lasted for about 30 minutes. The emergency lighting system was operational until after the passengers had been evacuated from the train.
In 2006, the power supplies for the emergency lighting systems on all VIA LRC2 and LRC3 cars (which included the cars on the train) were modified to nickel-cadmium (NiCd) batteries. According to specifications, these batteries were expected to provide 1.5 hours to 2 hours of power during emergency lighting conditions. Railway records indicate that the batteries were inspected and tested at the prescribed intervals (that is, in February 2009 and August 2009) with no discrepancies noted.
Analysis
The analysis will focus on the reasons for the failure of the high-pressure fuel injection line on locomotive VIA 902, coordination activities during passenger evacuation, and RTC activities during this emergency.
The Accident
The accident occurred when the diesel engine on VIA 902 caught fire. A broken high-pressure fuel injection line led to the release of fuel. The fuel contacted the hot surface of the engine exhaust manifold and ignited.
Laboratory analysis determined that the O-ring gasket, which is intended to ensure proper fit of the fuel injector pump, had been pinched between the fuel injector pump base plate and its cylinder seat. During normal train operation, this misaligned fuel injector pump created
- 11 -
excessive vibration of the pump, leading to progressive, high-cycle fatigue cracking and failure of two of the four mounting bolts that secure the pump to its seat. Once the fuel injector pump was loose, continued vibrations led to fatigue cracks and the eventual failure of the high- pressure fuel injection line.
The TSB observed a fuel injector pump change out after the accident and noted that the torquing of the mounting bolts was not conducted in increments of 30 ft-lbs as required by procedures. Instead, the installation was performed with each mounting bolt receiving the approximate 90 ft-lbs of torque individually. Improper torquing can lead to an improper seated O-ring gasket. As indicated in the fuel injector pump installation procedures, there is a correlation between an improperly seated O-ring gasket and the failure of the mounting bolts.
Although it is not known what torquing procedure was used when the fuel injector pump was installed on VIA 902 during its last “H” inspection, it is possible that a similar procedure (that is, 90 ft-lbs applied individually) had been used. Applying all of the required torque to the mounting bolts at once, rather than incrementally in a criss-cross pattern, may have caused the displacement of a portion of the rubber O-ring gasket.
Re-Use of Fuel Injector Pump Mounting Bolts
Examination of the bolts revealed that fatigue cracks had advanced in different intersecting directions. This suggests a change in the direction of the applied stresses. The most probable explanation for such a change is rotation of the bolts. The bolts could have turned on their own if they became loose during operation, or they could have been installed at a different turn position during removal and re-installation of the fuel injector pump. The re-use of fuel injector pump mounting bolts during scheduled maintenance increases the risk that bolts will fail in service due to undetected fatigue cracking, leading to locomotive engine fires.
Communicating Evacuation Instructions to Passengers
Once advised of the decision to evacuate, OBS personnel gave directions to the passengers in each car. The exact words as prescribed in procedures were not used by OBS personnel when directing the evacuation. Not all OBS personnel gave instructions in both official languages. Evacuation of all 323 passengers was completed within five minutes. Safe and timely train evacuation was not impeded by the manner in which evacuation instructions were communicated to the passengers.
Maintaining Communications Between Train Crew Members
Shortly after the train stopped, the locomotive engineer started walking eastward towards the McBean Street crossing to meet with the emergency responders and to help coordinate the emergency response. For maintaining communications during the emergency, the detrained locomotive engineers initially only had portable radios that were only effective for a short distance. As the locomotive engineer walked towards the McBean Street crossing, he lost contact after the first and only communication with the ICLE. In addition, the locomotive
- 12 -
engineer, while en route to the McBean Street crossing, was not able to communicate with emergency responders, VIA, the RTC and OBS personnel to start organizing the emergency response.
To facilitate communications, the ICLE walked past the locomotive engine fire to obtain the service manager’s cellular telephone. In addition, he re-entered the smoke-filled locomotive cab a number of times afterward to use the cab radio to maintain communications with the locomotive engineer and the emergency responders. While the emergency response was developing, periodic updates could not be immediately provided to the waiting passengers due to the communication difficulties experienced between train crew personnel and emergency responders positioned at the staging area.
Rail Traffic Control Workload During Emergency Situations
The foreman was not given a TOP to reach the disabled train using a hi-rail vehicle until 45 minutes after the occurrence was reported to the RTC. He had arrived at the McBean Street crossing within 17 minutes and was able to assist immediately. In addition, fire department personnel arrived at the staging area within 30 minutes.
Some of the 45-minute delay was due to difficulties in establishing and maintaining communications between the RTC and the crew. In the 45-minute period from the initial notification of the occurrence until the TOP was issued, the RTC was occupied for about 40 minutes with tasks directly related to this occurrence and for about 2 minutes with other RTC tasks. He handled 27 separate tasks during this period. The heavy task load resulting from this emergency situation, in conjunction with communication difficulties, prevented the RTC from facilitating the response in an optimal manner.
The following TSB Laboratory report was completed:
LP 121/2009 – Examination of Locomotive Fuel Injector Pump
Findings as to Causes and Contributing Factors
The locomotive diesel engine fire occurred when a high-pressure fuel injection line broke and released fuel. The fuel contacted the hot surface of the engine exhaust manifold and ignited.
An O-ring gasket had been pinched between the fuel injector pump and its seat, causing excessive vibration of the pump; this led to progressive, high-cycle fatigue cracking, the failure of two of the four mounting bolts that secured the fuel injector pump to the seat, and the eventual failure of the high-pressure fuel injection line.
During fuel injector pump installation, improper mounting bolt torquing may have occurred, resulting in the displacement (that is, pinching) of a portion of the O-ring gasket.
- 13 -
Findings as to Risk
Re-use of mounting bolts for fuel injector pump installation during scheduled maintenance increases the risk that these bolts will fail while in service due to undetected fatigue cracking, leading to locomotive engine fires. Other Findings
The exact words as prescribed in procedures were not used by on board services personnel in directing the evacuation and not all personnel gave directions in both official languages. However, train evacuation was not impeded by the manner in which evacuation instructions were communicated to the passengers.
While the emergency response was developing, periodic updates could not be immediately provided to the waiting passengers due to communication difficulties (for example, limitation of portable radios) between train crew personnel and emergency responders positioned at the staging area.
The heavy task load resulting from this emergency situation, in conjunction with communication difficulties, prevented the rail traffic controller from facilitating the response in an optimal manner.
Safety Action Taken
Action Taken by VIA Rail Canada Inc.
On 18 September 2009, VIA Rail Canada Inc. (VIA) completed an internal investigation report concerning this occurrence, which included a number of recommendations. To date, the following safety actions have been taken:
Bulletin P219 issued in August 2009 directs mechanical maintenance staff on:
- how to install fuel injection pumps;
- how to renew fuel injectors; and
- how to change out the General Electric (GE) engine power assembly.
Additionally, the bulletin highlights the hazards related to the mounting bolts becoming loose, and the inspection procedures on what to look for concerning the mounting bolts and gaskets.
VIA supplied all locomotive engineers operating on the Smiths Falls Subdivision with portable cellular telephones.
VIA is working with the manufacturer to ensure that batteries used in the emergency lighting system on light, rapid, comfortable (LRC) cars can be fully charged.
- 14 -
To better identify on board personnel during train evacuations, each VIA car is equipped with reflectorized vests for employees to wear.
VIA updated the training program for on board train personnel to include on site (hands on) evacuation procedures.
VIA is updating its passenger handling safety plan (to be released September 2010).
VIA’s training program entitled “Emergency Response Procedures Refresher Course for On-Train Employees” was revised to provide consistent training for bilingual emergency announcements and to improve communications between the in-charge locomotive engineer and the service manager during emergencies.
VIA’s maintenance documentation was revised to indicate that old mounting bolts on fuel injector pumps are to be discarded and replaced with new ones. A new pump replacement checklist was created to reflect this change.
Action Taken by the TSB
The TSB issued Rail Safety Advisory (RSA) 09/09 on 12 November 2009 entitled “Improper Fuel Injector Pump Installation on Locomotives.” In response to this RSA, on 03 December 2009, the Railway Association of Canada published an Advisory Safety Bulletin to inform its members of this problem.
Action Taken by Transport Canada
In December 2009, Transport Canada (TC) followed up with VIA to ensure that a procedure was put in place to address fuel injector pump installation.
In March 2010, TC met with VIA, which was in the process of implementing and finalizing its own report recommendations regarding this incident. TC will continue to follow up with VIA to ensure that all these recommendations are implemented.
Action Taken by RailTerm
In May 2010, RailTerm introduced the following rail traffic control protocols related to handling train emergencies:
Before a train crew is allowed to leave an incident site, the rail traffic controller (RTC) and the train crew will establish a clear communication protocol so that, if the RTC needs to contact the crew, there is a communication protocol to follow.
The RTC will be advised in what direction the crew is heading so that emergency responders can meet the crew at that location.
- 15 -
The RTC will advise the train crew on what needs to be done with the operating authorities so that the train crew can be ready and cancel its operating authority when it is safe to do so.
Once the foreman responding to the emergency is known, the RTC is to contact the train crew and supersede any operating authority to protect against the foreman. In this case, once the foreman gets on site, he or she can start assisting the emergency responders. When time permits, the RTC can contact the train crew and issue the required bulletin order to leave the equipment on the main track and cancel the train crew’s operating authority.
This report concludes the Transportation Safety Board’s investigation into this occurrence. Consequently, the Board authorized the release of this report on 08 June 2010.
Visit the Transportation Safety Board’s Web site (www.bst-tsb.gc.ca) for information about the Transportation Safety Board and its products and services. There you will also find links to other safety organizations and related sites.
- 16 -
Appendix A – Timeline for Passenger Evacuation from Site
Time Event 2019 Train crew obtains cellular telephone from on board services (OBS) personnel.
Train 46 calls VIA Rail Canada Inc. (VIA) Operations Control Centre (OCC) using cellular telephone. Discussions involved the arrangements for hi-rail vehicles and buses. 2025 Train 46 calls VIA OCC to discuss options for passenger evacuation from site.
Foreman arrives at the McBean Street Crossing with hi-rail vehicle. 2027 Train 46 calls VIA OCC to obtain rescue information and advises that the fire department is on site.
VIA OCC advises that buses were ordered and that they were ordering a crew for a rescue train. 2038 Ottawa fire department arrives and establishes the McBean Street crossing as the staging area. 2041 The foreman calls the rail traffic controller (RTC) to request track occupancy permit (TOP) to take firefighters to the train by hi-rail vehicle. 2045 With the delay in obtaining a TOP, some firefighters start to walk to the train from the McBean Street crossing. 2048 Emergency responders are informed that all passengers have safely detrained and are waiting on the track in the vicinity west of the train. 2053 RTC issues an order to leave the VIA train as “equipment left on main track,” and then cancels the train’s clearance.
A TOP is then issued to facilitate transporting fire department personnel to the train by hi-rail vehicle. 2113 The locomotive fire has been extinguished. Emergency responders request that passengers walk eastward past the head end of the train towards the McBean Street crossing. 2139 The first passengers arrive by hi-rail vehicle and on foot at the McBean Street crossing.
Several passengers who were having difficulty traversing the roadbed are transported westward by hi-rail vehicle to the Kettles Road crossing, where they are then transferred by ambulance to the McBean Street crossing. 2159 Emergency responders are advised that a rescue train is coming to pull the disabled train and to possibly transport passengers back to the station. 2226 Emergency responders advise VIA OCC that passengers will be transported by bus to designated train stations (Fallowfield and Ottawa). 2323 All passengers and crew members have departed the McBean Street Crossing staging area.
- 17 -
Appendix B – Rail Traffic Controller Activities Related to Occurrence
Time Task Duration (min:sec) 2008:19 Emergency report received regarding train 46. 01:07 2009:27 Call made to the Ottawa fire department regarding train 46. 07:28 2016:56 Unsuccessful attempt to call foreman. 00:42 2017:39 Unsuccessful attempt to call VIA Rail Canada Inc. (VIA) 00:14 2019:00 Discussions with railway personnel regarding availability of hi-rail vehicles. 00:55 2019:55 Coordinate with fire department regarding rendezvous with railway personnel. Call is placed on hold. 00:29 2020:25 Unsuccessful attempt to contact foreman. 00:18 2020:44 Continue conversation with fire department regarding location to meet hi-rail vehicles. 01:07 2021:52 Coordinate with train 46 in preparation to cancel clearance. 04:33 2026:25 Update VIA Operations Control Centre (OCC) on the situation. 00:35 2027:00 Discussion with railway personnel regarding hi- rail vehicles. 00:57 2027:57 Conversation with foreman en route to train. 00:15 2028:12 Advise Canadian National (CN) rail traffic controller (RTC) of the situation. 00:37 2029:00 Apply computer blocking to protect train. Form T General Bulletin Order (GBO) prepared and printed for later distribution to other trains. 02:00 2031:04 Unsuccessful attempt to call a railway employee. 00:18 2031:23 Follow-up discussions with fire department to confirm staging area arrangements. 02:22 2033:45 Update VIA OCC regarding passenger evacution. 01:00 2034:46 Continue discussions with fire department regarding passenger evacuation. 01:01 2036:18 Call TSB to provide occurrence notification information. 03:30 2039:49 Receives call from passenger train 910 on the Chatham Subdivision. 01:06 2041:33 Conversation with foreman regarding track occupancy permit (TOP). 00:45 2042:24 Unsuccessful attempt to contact train 46 to cancel its clearance. 00:36 2043:00 Issue a clearance on the Chatham Subdivision. 01:26 2044:26 Conversation with fire department regarding authorization of hi-rail vehicles. 01:00 2045:26 Unsuccessful attempt to contact the train to cancel its clearance. 02:08 2047:35 Issue form T GBO to train 46 followed by cancellation of the train’s clearance. 05: 11 2053:03 Re-establish communication with foreman to issue TOP. 00:38
FD06090 | 2009_加拿大运输安全委员会_维亚铁路客运列车机车柴油引擎起火_R09H0010_火灾报告(英文).md
分类:06_境外及港澳台调查报告 | 年份:2009 | 地域: | 严重程度: | 场所:交通/车辆 | 起火原因:燃气/爆炸 | 来源格式:md
1. 标题与报告编号
- 标题:Railway Investigation Report R09H0010
- 报告编号:R09H0010
2. 机构与发布日期
- 机构:Transportation Safety Board of Canada(TSB)
- 发布:2010 年 6 月 8 日;事发 2009 年 8 月 16 日
3. 事故摘要
- 日期/地点:2009 年 8 月 16 日 2005 EDT;Mile 14.26, Smiths Falls Subdivision, Richmond, Ontario
- 事件:VIA Rail Canada 客运列车 46 机车柴油发动机起火。列车约 95 mph 东行时失去动力,刹车自动施加,停车后烟雾与火焰从机车引擎室冒出。无机舱火警探测系统。323 名乘客撤离,1 名机车工程师因烟暴露需医疗,无重伤。
4. 原因 / 发现
- 直接原因:高压燃油喷射管断裂泄漏燃油,接触高温排气歧管并点燃。
- 关键因素:O 形圈垫片被夹在燃油喷射泵与阀座间,致过度振动…渐进高周疲劳裂纹,4 个安装螺栓中 2 个失效…最终高压燃油管失效。
- 贡献因素:安装燃油喷射泵时可能螺栓扭矩不当,致 O 形圈垫片位移(夹伤)。
- 风险发现:重复使用安装螺栓…增加螺栓使用中因未检出疲劳裂纹失效、致机车引擎火灾风险。
5. 安全行动
- VIA:公告 P219 指导安装燃油喷射泵;弃用旧螺栓换新品;配便携蜂窝电话;更新演练与双语广播培训。
- TSB:发铁路安全建议 RSA 09/09(机车燃油喷射泵安装不当)。
- Transport Canada:跟进确保 VIA 落实安装程序。
- RailTerm(2010-05):新增 RTC 应急协议(建立通信、告知方向、取消运行授权、保护工长等)。
FD06091 | 2012_加拿大运输安全委员会_派珀_PA-34右发动机失效起火迫降_Victoriaville_A12Q0182_火灾报告(英文).md
分类:06_境外及港澳台调查报告 | 年份:2012 | 地域: | 严重程度: | 场所: | 起火原因:焊接/动火 | 来源格式:md
加拿大 TSB | Piper PA-34 右发动机失效起火迫降调查(A12Q0182)
基本情况 / Incident summary
- 时间:2012年10月15日
- 运营/机型:Nadeau Air Service Piper PA-34-200,自 Trois-Rivières 起飞的训练飞行,机上 2 名飞行员。
- 事件:在 Victoriaville 机场复飞(missed approach)过程中,右发动机失效并起火(right engine failed and caught fire)。机组按程序处置,但因一处客舱加热器导管控制钢索断开,烟雾与火进入驾驶舱。随后驾驶舱充满浓烟,机组迅速下降试图在机场附近田野迫降,飞机触地并倒扣停住。2 名飞行员重伤(seriously injured)。
原因 / Cause and findings
调查认定:
- 右发动机曲轴箱(crankcase)经焊接修复区域存在疲劳裂纹(fatigue crack),该修复未达到发动机制造商标准;裂纹扩展最终导致发动机失效。
- 发动机机油在发动机舱内蔓延并起火。
- 因加热器导管一根控制钢索断开,无法阻止烟雾与火进入驾驶舱。
- 报告指出焊接修复曲轴箱存在发动机失效风险增加;另存在飞机异常未系统记录于航行日志、导致机组缺乏关键飞行安全信息的风险。
安全提示
强调焊接修复曲轴箱的风险与飞机异常记录/信息传递的重要性。
FD06092 | 2012_加拿大运输安全委员会_派珀_PA-34右发动机空中起火迫降_A12Q0182_火灾报告(英文).md
分类:06_境外及港澳台调查报告 | 年份:2012 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:md
1. 报告标题与报告编号
- 标题:Air transportation safety investigation A12Q0182 — In-flight engine fire leading to a forced landing
- 报告编号:A12Q0182
2. 机构与发布日期
- 机构:Transportation Safety Board of Canada(TSB)
- 发布日期:2014 年 10 月 1 日
3. 事故摘要
- 日期:2012 年 10 月 15 日
- 地点:Victoriaville, Quebec,机场以东 2 nm
- 航空器:Piper PA-34-200(注册号 C-GNAS,序列号 34-7350133),Nadeau Air Service Inc.
- 事件:该机从 Trois-Rivières 机场起飞,载 2 名飞行员执行仪表训练飞行。在 2100 英尺、Victoriaville 机场复飞进近时,右发动机灾难性失效并起火。1402 EDT 受训飞行员因发动机起火宣布紧急状态并打算着陆。驾驶舱内浓烟弥漫。飞机转向并快速下降,试图降落在 Victoriaville 机场以东 2 nm 的田地。飞机触地并倒扣停住。2 名飞行员重伤。目击者数分钟内协助,Victoriaville 消防队约 10 分钟后抵达。406 MHz 应急定位发射机撞击时激活。
4. 原因 / 因果因素
- 本页为 class 3 调查概览,完整"Findings as to causes and contributing factors"载于最终报告(链接:/rapports-reports/aviation/2012/a12q0182/a12q0182.html)。概览确认直接原因为右发动机灾难性失效并起火(catastrophic failure and caught fire),导致浓烟与强制着陆。
5. 安全发现
- 本页未列详细风险发现;class 3 调查分析少量安全问题,可能产生建议。
6. 安全建议 / 纠正行动
- 详见最终报告。本概览页未列出具体建议。
FD06093 | 2013_加拿大运输安全委员会_Buffalo_DC-3C右发动机起飞后起火_A13W0120_火灾报告(英文).md
分类:06_境外及港澳台调查报告 | 年份:2013 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:md
1. 报告标题与报告编号
- 标题:Air transportation safety investigation A13W0120 — Engine failure after takeoff and collision with terrain
- 报告编号:A13W0120
2. 机构与发布日期
- 机构:Transportation Safety Board of Canada(TSB)
- 发布日期:2015 年 4 月 27 日
3. 事故摘要
- 日期:2013 年 8 月 19 日
- 地点:Yellowknife Airport, Northwest Territories
- 航空器:Buffalo Airways Ltd. Douglas DC-3C(注册号 C-GWIR,序列号 9371)
- 事件:该机执行 Yellowknife 至 Hay River 定期客运航班。1708 MDT 从 16 号跑道起飞后,右发动机起火。机组执行紧急关车并向 10 号跑道做低空右转。飞机在 10 号跑道入口西南侧树林相撞,起落架收起状态下接地于跑道南侧。完成撤离,3 名机组与 21 名乘客无受伤。无撞击后火灾,406 MHz 应急定位发射机未激活。
4. 原因 / 因果因素
- 本页为 class 3 调查概览,完整"Findings as to causes and contributing factors"载于最终报告。新闻稿标题指出:"Engine failure and an overweight aircraft led to the 2013 Buffalo Airways collision with terrain"。直接事件为起飞后右发动机起火(fire in the right engine)。
5. 安全发现
- class 3 调查;本概览页未列详细风险发现。
6. 安全建议 / 纠正行动
- 详见最终报告。新闻稿(a13w0120-20150427)提供完整调查结论。
FD06094 | 2013_加拿大运输安全委员会_CN原油液化石油气脱轨起火_盖恩福德_R13E0142_火灾报告(英文).md
分类:06_境外及港澳台调查报告 | 年份:2013 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:md
1. 报告标题与报告编号
- 标题:Railway Investigation Report R13E0142
- 报告编号:R13E0142
2. 机构与发布日期
- 机构:Transportation Safety Board of Canada(TSB)
- 发布:授权 2015-01-28,首次发布 2015-02-24,更正版 2015-02-26
3. 事故摘要
- 日期:2013 年 10 月 19 日 0100 MDT
- 地点:Mile 57.25, Edson Subdivision, near Gainford, Alberta
- 事件:Canadian National 货运列车 M30151-18 自 Edmonton 西行往 Vancouver,在 Gainford 侧线东端曲线处脱轨 13 辆车(含 4 辆石油原油罐车与 9 辆液化石油气 LPG 罐车)。列车触发紧急制动。
- 火灾要点:脱轨 LPG 罐车中 2 辆破裂起火,第 3 辆经安全阀泄出并点燃。约 600 英尺轨道损毁。无人员受伤。周边共 106 户居民疏散。
4. 原因 / 因果因素
- 列车脱轨因 1 处或多处钢轨断裂发生于曲线高轨,列车通过 Gainford 侧线东端曲线时。
- 钢轨碎裂源于高轨曲线段大量横向缺陷(transverse defects),缺陷始于因高密度高负荷产生的 shelling 区域。
- 曲线平衡速度 15.5 mph(限速 25 mph),轮轨界面(高轨轨距面)应力更高,利于 shelling 与疲劳裂纹形成。
- 当某横向缺陷达到临界尺寸,剩余轨头面积(已近磨耗极限)无法支撑载荷,导致钢轨突然完全失效。
- 尽管不到 2 个月前做过钢轨探伤检测,该区域轨面 head checking 与 shelling 影响了系统检测横向缺陷的能力。
5. 安全发现
- 若仅更换曲线一侧高度不同的钢轨,会改变曲线超高度与平衡速度,增加另一侧钢轨应力与损伤风险。
- 若钢轨表面缺陷在超声探伤前未清除,存在内部缺陷未被检出导致断轨脱轨风险。
- 双 shelf 车钩设计使脱轨罐车保持连接,罐车端部已加强承受端撞,但罐车车体在脱轨分离时易受侧撞。
- 脱轨后采取了适当有效措置保护现场与公众安全。
6. 安全建议 / 纠正行动
- CN 事后对所有 25 mph 侧线进行步行检查与钢轨探伤复测;复测前限速由 25 mph 降至 15 mph。步行检查用于识别并制定更换具 head checking 表面状况或 spalling 且轨头磨耗 >19 mm 的钢轨计划。Gainford 侧线于 10 月 24 日步行检查。
- CN 已启动高限速侧线(如 Gainford)钢轨打磨计划。
FD06095 | 2013_加拿大运输安全委员会_摩洛哥皇家航空_B767传送带起火撤离_A13Q0186_火灾报告(英文).md
分类:06_境外及港澳台调查报告 | 年份:2013 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:md
1. 标题与报告编号
- 标题:Air transportation safety investigation A13Q0186 — Belt loader fire leading to cabin smoke and evacuation of passengers(Royal Air Maroc Boeing 767-36N/ER, CN-RNT, Montréal)
- 报告编号:A13Q0186
2. 机构与发布日期
- 机构:Transportation Safety Board of Canada(TSB)
- 发布:2015 年 2 月 3 日;事发 2013 年 11 月 4 日
3. 事故摘要
- 日期/地点:2013 年 11 月 4 日;Montréal-Pierre Elliott Trudeau International Airport, Quebec
- 航空器:Royal Air Maroc Boeing 767-36N/ER(CN-RNT),航班 RAM206,载 243 乘客 +8 机组
- 事件:1641 飞机停靠 61 号廊桥;1645:20 地面人员在左后货舱门下放置的 传送带(belt loader)起火。烟味渗入客舱,机长下令撤离。部分乘客经廊桥、部分经滑梯撤离。机场消防 1649:50 到场控制火势。飞机无损。
4. 原因 / 结论
- 本页为 class 3 调查概览,完整"Findings"载于最终报告。新闻稿标题:"Fuel system deficiency caused a belt loader fire"。直接事件为传送带燃油系统缺陷起火并致客舱烟熏撤离。
5. 安全行动
- 详见最终报告与 2015-02-03 新闻稿(a13q0186-20150203)。
FD06096 | 2013_加拿大运输安全委员会_梅干提克湖镇_MMA5017机车引擎火灾实验室报告_LP181_火灾报告(英文).md
分类:06_境外及港澳台调查报告 | 年份:2013 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:md
1. 标题与报告号
- 标题:TSB Laboratory Report LP181/2013(机车 MMA 5017 引擎火灾原因实验室报告)
- 报告号:LP181/2013
2. 机构与日期
- 机构:Transportation Safety Board of Canada(TSB)工程实验室
- 关联事件:2013 年 7 月 5–6 日 Lac-Mégantic 事故;本报告属 R13D0054 调查一部分
3. 分析摘要(含火灾背景)
应 TSB 东部铁路/管道运维请求,对领头机车 MMA 5017(GE C30-7,1979 年造)引擎检查以确定引擎火灾原因。 火灾背景:2013-07-05 约 2350,魁北克 Nantes 的 MMA 5017 领头机车报火,应急 shutdown 后灭火;列车(72 辆运原油 Class 111 罐车)停在下坡道。近 0100 列车溜车至 Lac-Mégantic 脱轨起火。本报告专析领头机车引擎火灾成因。
4. 主要发现
- R4/R5 凸轮轴承在 "不当修复孔(improperly repaired bore)" 中因 "mounting bolt was over-tightened" 而断裂。
- 2012-10-17 引擎损坏后以 "polymeric material" 临时修复缸体,其"不具备所需强度与耐久性能"。
- 轴承失效致 R5 阀系机油减少,阀杆卡滞,活塞穿孔:punctured piston crown。
- 机油流入进/排气歧管并积于涡轮机体;怠速时涡轮内机油被点燃,于排气栈形成 "blow-torch type of fire"。
- 油底壳仅余约 250 加仑(正常 380),佐证机油异常流失。
5. 安全关联
- 临时聚合物修复经 MMA 签字批准即投用,反映维修监管缺口;
- 低油压保护未触发,阀失效前机车持续运行,凸显关键部件失效预警不足;
- 直接前置事件为不合规范缸体修复,警示机车引擎大修须符合原厂强度标准,以防引发火灾及后续列车灾难。
FD06097 | 2013_加拿大运输安全委员会_梅干提克湖镇失控脱轨原油起火47死_R13D0054_火灾报告(英文).md
分类:06_境外及港澳台调查报告 | 年份:2013 | 地域: | 严重程度: | 场所: | 起火原因:燃气/爆炸 | 来源格式:md
1. 标题与报告编号
- 标题:Runaway and main-track derailment — Montreal, Maine & Atlantic Railway freight train MMA-002, Mile 0.23, Sherbrooke Subdivision, Lac-Mégantic, Quebec
- 报告编号:R13D0054
2. 机构与发布日期
- 机构:Transportation Safety Board of Canada(TSB)
- 事故日期:2013 年 7 月 6 日(列车 7 月 5 日晚停泊)
3. 事故摘要
- MMA-002 于 Nantes 无人看守停泊,约 0100 EDT 溜走,行 7.2 英里达 65 mph。约 0115 在 Lac-Mégantic 市中心脱轨:63 节原油(UN1267)罐车 +2 节棚车脱轨,约 600 万升原油溢出。火灾与爆炸,摧毁 40 栋建筑、53 辆车;47 人死亡,约 2000 人撤离;污染环境与河湖。
4. 原因 / 发现
- 停泊仅对机车组与缓冲车(共 7 辆)施手煞,未对罐车施手煞;消防关引領机车致气源流失,自动煞车逐渐泄漏。"With no locomotive running, the air in the train's brake system slowly began to be depleted" 列車溜走。
- 手煞效力测试不足;QRB 阀故障令机车手煞无效;RSC 断电未触发惩罚煞车。
- 罐车为 DOT 111A100W1,无头盾/外套/热防护;94% 脱轨罐车破损漏油。
5. 安全行动
- TSB 既往建议 R07-04:扩展 286,000 磅车建造标准至所有运危货无压罐车。
- AAR 修订 CPC-1232(2011-10-1 后车):强化结构、顶部保护、PRD、正火钢;本次车均早于该期不受限。
- 报告提防御措施:脱轨器、止轮器、机械急停、ECP 煞车、SBU 软体更新致紧急煞车等。
FD06098 | 2014_加拿大运输安全委员会_CN货运列车脱轨危险货物起火_R14W0256_火灾报告(英文).md
分类:06_境外及港澳台调查报告 | 年份:2014 | 地域: | 严重程度: | 场所:交通/车辆 | 起火原因:燃气/爆炸;焊接/动火;纵火 | 来源格式:md
1. 报告标题与报告编号
- 报告标题:Railway Investigation Report R14W0256(主线脱轨事故 / Main-track derailment)
- 报告编号:R14W0256
2. 机构与发布日期
- 调查机构:Transportation Safety Board of Canada(加拿大运输安全委员会,TSB)
- 事故日期:2014年10月7日
- 报告发布:正文中引用 TC 后续行动最晚至 2016 年 7 月,TSB 对 TC 建议评估在 2016 年 3 月,报告约发布于 2016 年(网页未明示具体发布日)。
3. 事故摘要(日期、地点、经过)
- 日期:2014年10月7日,约 1135 Central Standard Time
- 地点:Mile 74.58, Margo Subdivision,Near Clair, Saskatchewan(加拿大国家铁路公司 CN 马戈分区,克莱尔附近)
- 经过:
- Canadian National Railway(CN)货运列车 A40541-05 向西行驶,由 3 台机车、40 辆重车、53 辆空车、7 辆残留罐车组成,总重 6727 吨。
- 列车以 40 mph 行驶、throttle position 6、brakes released 时,乘务组感到列车牵拉,随后列车触发紧急制动。
- 第 32 至 57 位车(共 26 辆,含 6 辆装载危险货物罐车)脱轨,其中第 51、52 位罐车(GATX 82043、PROX 126)装载石油馏分(petroleum distillates, UN 1268)破裂并起火。
- 约 50 名居民在两英里半径内撤离,Provincial Highway 5 关闭,约 650 英尺轨道损毁,无人员伤亡。
- 调查显示南轨在 Mile 74.58 因未检测出的横向细节缺陷(TDD)突然断裂导致脱轨。
4. 原因 / 因果因素
- 直接原因:
- “The train derailed when a sudden and catastrophic failure of the south rail occurred under the train, due to an undetected TDD.”(由于未检测出的横向细节缺陷,南轨在列车下突然灾难性断裂导致脱轨)
- 该 TDD 起于轨头上线规角(upper gauge corner)的 head check cracks,正常生长至轨头横截面积约 20%,近期生长至约 85%,剩余截面过载断裂。
- 促成因素:
- 超声检测(UT)受限:轨面状况(shelling、head checking、LSC)抑制 UT 信号传入轨头,可能掩盖了 TDD。
- 钢轨服役寿命末期:1959 年 100 磅连续焊接轨,使用超 50 年;2010–2014 年运量增 480%,加速疲劳缺陷。
- 钢轨打磨频率不足:CN 主线约每 20 MGTM/M 打磨,但 Margo 分区 2010、2012 年打磨后运量骤增,未及去除表面病害。
- LSC 监测但未达 condemn 限度:3.5 mm LSC 标记监测,未要求手检,缺陷在 UT 下未显。
5. 安全发现(Safety Findings)
- 轨道结构:脱轨点南轨为 1959 年 100 磅轨,有 ¼ 英寸垂直磨耗;实验室确认 detail fracture 起于 2014 年 7 月 18 日检出的 3.5 mm LSC 处。
- 检测系统:列车经过多种 wayside inspection systems(热轴探测、轮载探测),脱轨前未识别显著缺陷。
- 危险货物:6 辆 DG 罐车中,2 辆石油馏分(UN 1268)破裂燃烧,2 辆盐酸(UN 1789)、2 辆氢氧化钠溶液(UN 1824)未泄漏。
- 罐车性能:涉事 Class 111 罐车无隔热、无头部防护;GATX 82043 受冲击穿孔,PROX 126 因火灾热撕裂。
- 应急管理:unified command system 建立,但 Wadena 消防队长无 NFPA 472 训练;CN 未用天气监测设备;CN 日志仅 9/108 页填,无 close-call 记录。
- 人为因素:AVP、SDGO 通宵无休,受昼夜节律与疲劳影响。
- 监管:TC 对 SMS 有规,CN 有 SMS 但现场实践偏离程序。
6. 安全建议 / 纠正行动(Safety Recommendations / Corrective Actions)
- TSB 建议 R14-01(致 TC 与 PHMSA):要求所有运输易燃液体的 Class 111 罐车满足增强保护标准,显著降低事故中货物泄漏风险。TC 响应:2014-04-23 宣布三年淘汰旧 Class 111;2015-05 发布 TC-117 标准;2016-07-24 Protective Direction 38 提前淘汰未改装 DOT-111。TSB 评“Satisfactory Intent”。
- TSB 建议 R14-02(致 TC):要求为运输危险货物列车设定严格运营标准,并要求铁路公司进行路线规划分析、定期风险评估。TC 响应:2014-04-23 部长令 14-01;2015-04-01 生效 SMS 规含风险评估。TSB 评“Satisfactory Intent”。
- CN 内部行动:2016-01-07 发布 SOG 200.16 Controlled Burn,要求点火源与开口呈 90 度。
- 其他监管/行业:AAR CPC-1232(2011)改 Class 111 标准;TC-117 要求新罐车厚钢、隔热、全高头盾等。
FD06099 | 2014_加拿大运输安全委员会_庞巴迪_CS100涡轮转子非包容性失效起火_A14Q0068_火灾报告(英文).md
分类:06_境外及港澳台调查报告 | 年份:2014 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:md
1. 报告标题与报告编号
- 标题:Air transportation safety investigation A14Q0068 — Uncontained turbine rotor failure
- 报告编号:A14Q0068
2. 机构与发布日期
- 机构:Transportation Safety Board of Canada(TSB)
- 发布日期:2016 年 7 月 5 日
3. 事故摘要
- 日期:2014 年 5 月 29 日
- 地点:Montréal International (Mirabel) Airport, Quebec
- 航空器:Bombardier BD-500-1A10(C Series CS100),注册号 C-FBCS,序列号 50001
- 事件:该机载 2 名飞行员与 4 名试飞工程师在 Mirabel 机场进行发动机地面试车。1837 EDT 测试中左发动机(Pratt & Whitney Canada PW1524G)发生突然功率损失,由 非包容性涡轮转子失效(uncontained turbine rotor failure) 引起。机组被告知发动机冒烟起火后立即关停发动机并宣布紧急状态。全体人员撤离。Bombardier 地面人员成功灭火。无人员受伤,但发动机与飞机严重受损。
4. 原因 / 因果因素
- 本页为 class 3 调查概览。新闻稿标题:"Hot engine shutdowns led to turbine rotor failure during Bombardier pre-aircraft certification tests"。直接事件为左发动机非包容性涡轮转子失效并起火。
5. 安全发现
- class 3 调查;本概览页未列详细风险发现。
6. 安全建议 / 纠正行动
- 详见最终报告与 2016-07-05 新闻稿(a14q0068-20160705)。
FD06100 | 2015_加拿大_TSBC_R15H0013_CN_Crude_Oil_Derailment_Fire_Gladwick_Ontario_2015.pdf
分类:06_境外及港澳台调查报告 | 年份:2015 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
RAILWAY INVESTIGATION REPORT R15H0013
Main-track train derailment Canadian National Railway Company Freight train U70451-10 Mile 111.7, Ruel Subdivision Gladwick, Ontario 14 February 2015
Transportation Safety Board of Canada Place du Centre 200 Promenade du Portage, 4th floor Gatineau QC K1A 1K8 819-994-3741 1-800-387-3557 www.tsb.gc.ca communications@bst-tsb.gc.ca © Her Majesty the Queen in Right of Canada, as represented by the Transportation Safety Board of Canada, 2017 Railway Investigation Report R15H0013 Cat. No. TU3-6/15-0013E-PDF ISBN 978-0-660-07280-7 This report is available on the website of the Transportation Safety Board of Canada at www.tsb.gc.ca Le présent rapport est également disponible en français.
The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. Railway Investigation Report R15H0013 Main-track train derailment Canadian National Railway Company Freight train U70451-10 Mile 111.7, Ruel Subdivision Gladwick, Ontario 14 February 2015 Summary On 14 February 2015, at about 2335 Eastern Standard Time, Canadian National Railway Company (CN) crude oil unit train U70451-10 was proceeding eastward at about 38 mph on CN’s Ruel Subdivision when it experienced a train-initiated emergency brake application at Mile 111.7, at Gladwick, near Gogama, Ontario. A subsequent inspection determined that the 7th through 35th cars (29 cars in total) had derailed. Nineteen of the tank cars were breached, and about 1.7 million litres of petroleum crude oil were released to either atmosphere or surface. The released product ignited, and the fires burned for 5 days. About 900 feet of mainline track was destroyed. There was no evacuation, and there were no injuries. Le présent rapport est également disponible en français.
Railway Investigation Report R15H0013 | iii
Table of contents 1.0 Factual information.......................................................................... 1 1.1 The accident ....................................................................................................... 1 1.2 Site examination ................................................................................................. 2 1.3 Weather.............................................................................................................. 4 1.4 Dangerous goods ................................................................................................ 5
Class 3 flammable liquids......................................................................................................5 1.4.1
Petroleum crude oil ................................................................................................................5 1.4.2
Emergency response procedures for petroleum crude oil .............................................6 1.4.3 1.5 National Fire Protection Association 472 Standard............................................... 7 1.6 Approach to the management of occurrences involving dangerous goods at Canadian National Railway Company ................................................................ 8 1.7 Incident command .............................................................................................. 8 1.8 Emergency response ........................................................................................... 9
Incident command documentation .................................................................................. 10 1.8.1
Accident site monitoring .................................................................................................... 10 1.8.2 1.9 Environmental impact ...................................................................................... 12
Site description ..................................................................................................................... 12 1.9.1
Surface water monitoring program.................................................................................. 13 1.9.2
Wastewater treatment and water diversion activities.................................................. 13 1.9.3
Groundwater monitoring program.................................................................................. 13 1.9.4
Soil excavation and containment ...................................................................................... 13 1.9.5
Site restoration ...................................................................................................................... 14 1.9.6 1.10 Class of track .................................................................................................... 14 1.11 Subdivision information ................................................................................... 14 1.12 Rail joints ......................................................................................................... 15 1.13 Rail end batter and localized surface collapse .................................................... 15 1.14 Track inspection ............................................................................................... 17 Track geometry inspection ................................................................................................. 17 1.14.1 Rail flaw inspection ............................................................................................................. 19 1.14.2 Visual inspection .................................................................................................................. 20 1.14.3 Track inspection guidelines at Canadian National Railway Company ................... 22 1.14.4 Joint bar inspection systems............................................................................................... 23 1.14.5 1.15 Impact of cold weather on track infrastructure .................................................. 23 1.16 Canadian National Railway Company Engineering Notice 2015-E-01................. 24 1.17 Employee development .................................................................................... 25 Engineering employee development and training path .............................................. 25 1.17.1 Assistant track supervisor mentoring.............................................................................. 27 1.17.2 Effective mentoring for developing expertise................................................................ 27 1.17.3 1.18 Track maintenance on the Ruel Subdivision ...................................................... 28 Senior manager engineering .............................................................................................. 28 1.18.1 Track supervisor................................................................................................................... 28 1.18.2 Assistant track supervisor .................................................................................................. 28 1.18.3 Track maintenance challenges on the Ruel Subdivision ............................................. 29 1.18.4 1.19 Regulatory oversight......................................................................................... 30
iv| Transportation Safety Board of Canada
Transport Canada regulatory track inspections ............................................................ 31 1.19.1 1.20 Railway Safety Management System Regulations .............................................. 32 1.21 Canadian National Railway Company’s safety management system .................. 33 1.22 Safety culture.................................................................................................... 34 1.23 Safety culture at Canadian National Railway Company ..................................... 36 1.24 Resilience: The safe operating envelope and requisite imagination ..................... 36 1.25 Significant accidents involving Class 111 tank car releases ................................. 38 1.26 The Lac-Mégantic accident ................................................................................ 38 1.27 Response from Transport Canada to TSB Recommendation R14-01 (January 2016)................................................................................................................. 39 1.28 Board assessment of Transport Canada’s response to TSB Recommendation R14-01 (March 2016).......................................................................................... 40 1.29 Association of American Railroads Circular OT-55-N and TSB Recommendation R14-02................................................................................... 40 1.30 Response from Transport Canada to TSB Recommendation R14-02 (January 2016)................................................................................................................. 41 1.31 Board assessment of Transport Canada’s response to TSB Recommendation R14-02 (March 2016).......................................................................................... 42 1.32 Rules Respecting Key Trains and Key Routes .................................................... 42 1.33 Canadian National Railway Company corridor risk assessment......................... 43 1.34 Factors affecting the severity of derailment of tank cars carrying hazardous materials........................................................................................................... 44 1.35 TSB Laboratory examination of the failed insulated joint ................................... 45 1.36 TSB testing of crude oil samples ........................................................................ 47 1.37 Tank car information ........................................................................................ 51 1.38 Site examination of derailed tank cars ............................................................... 55 Tank car breaches ................................................................................................................. 55 1.38.1 Damage to tank car shell .................................................................................................... 57 1.38.2 Thermal damage................................................................................................................... 57 1.38.3 Damage to head shield and tank head ............................................................................ 58 1.38.4 Damage to top fittings and pressure relief devices ...................................................... 58 1.38.5 Damage to manways ........................................................................................................... 59 1.38.6 Damage to skid protection and bottom outlet valves .................................................. 59 1.38.7 Damage to stub sill............................................................................................................... 61 1.38.8 Tank shell material properties........................................................................................... 62 1.38.9 1.39 TSB safety issues investigations......................................................................... 63 1.40 TSB Watchlist ................................................................................................... 64 Safety management and oversight ................................................................................... 64 1.40.1 Transportation of flammable liquids by rail .................................................................. 65 1.40.2 1.41 TSB laboratory reports ...................................................................................... 66 2.0 Analysis ......................................................................................... 67 2.1 The accident ..................................................................................................... 67 2.2 Joint bar failure ................................................................................................. 67 2.3 Effect of cold weather ....................................................................................... 68 2.4 Rail end batter and joint bar cracks.................................................................... 68 2.5 Monitoring of rail end batter condition and joint bar inspection ......................... 69
Canadian National Railway Company track inspection guidelines ......................... 69 2.5.1
Canadian National Railway Company Engineering Track Standards..................... 70 2.5.2
Emerging joint bar inspection technology ...................................................................... 70 2.5.3
Railway Investigation Report R15H0013 | v
- 6
Assistant track supervisor training and mentoring at Canadian National Railway Company ............................................................................................ 71 2.7 Petroleum crude oil sample analysis.................................................................. 72
Dangerous goods placards on tank cars ......................................................................... 73 2.7.1 2.8 Tank car performance ....................................................................................... 73
Shell breaches ........................................................................................................................ 74 2.8.1
Breaches caused by thermal tears ..................................................................................... 74 2.8.2
Head and head shield damage.......................................................................................... 75 2.8.3
Manway, top fitting, and pressure relief device damage ............................................ 75 2.8.4
Bottom outlet valve damage .............................................................................................. 75 2.8.5
Stub sill damage ................................................................................................................... 76 2.8.6 2.9 Tank car material properties.............................................................................. 76 2.10 New regulations for tank cars in flammable liquids service................................ 77 2.11 Key train speed................................................................................................. 78 2.12 Canadian National Railway Company corridor risk assessment......................... 79 2.13 Regulatory oversight for the Ruel Subdivision ................................................... 80 2.14 Emergency response ......................................................................................... 81 Site access control................................................................................................................. 81 2.14.1 Safety management system and Canadian National Railway Company 2.14.2 incident command documentation .................................................................................. 82 Site monitoring and respiratory protection .................................................................... 82 2.14.3 2.15 Environmental impact ...................................................................................... 83 3.0 Findings......................................................................................... 84 3.1 Findings as to causes and contributing factors ................................................... 84 3.2 Findings as to risk ............................................................................................. 85 3.3 Other findings .................................................................................................. 86 4.0 Safety action .................................................................................. 88 4.1 Safety action taken ............................................................................................ 88
Transportation Safety Board of Canada .......................................................................... 88 4.1.1
Transport Canada................................................................................................................. 88 4.1.2
Canadian National Railway Company............................................................................ 89 4.1.3 4.2 Safety concern .................................................................................................. 92
Speed of unit trains transporting Class 3 flammable liquids ..................................... 92 4.2.1 4.3 Safety action required ....................................................................................... 94
Validation of maximum speed for trains transporting dangerous goods ............... 94 4.3.1 Appendices .......................................................................................... 96 Appendix A – Weather data from 14 February to 21 February 2015 ............................ 96 Appendix B – Canadian National Railway Company Engineering Notice No. 2015-E-01, Regional Chief Engineering to All Engineering Employees Eastern Region (15 January 2015)....................................................................... 97 Appendix C – National Transportation Safety Board reports involving crude oil trains ................................................................................................................ 98
Railway Investigation Report R15H0013 | 1
- 0 Factual information
- 1
The accident On 10 February 2015, Canadian National Railway Company (CN) crude oil unit train U70451-10 (the train) departed eastward from Edmonton, Alberta, destined for the Valero Energy Corporation (Valero) refinery located at Lévis, Quebec. The train consisted of 2 head-end locomotives and 100 tank cars loaded with dangerous goods (DGs). Of these 100 cars, 68 were loaded with petroleum crude oil (UN 1267), and 32 were loaded with petroleum distillates (UN 1268). The train was 6089 feet long and weighed 14 355 tons. The train was designated as a key train1 operating on a key route.2 On 14 February, a regular crew change was made at Hornepayne, Ontario, located at Mile 296.2 of CN’s Ruel Subdivision.3 The outbound train crew consisted of a locomotive engineer and a conductor. Both were familiar with the territory, met fitness and rest requirements, and were qualified for their positions. The train departed eastward on the subdivision at about 2015.4 At about 2335, while proceeding at about 38 mph, the train experienced a train-initiated emergency brake application at Mile 111.7 at Gladwick, near Gogama, Ontario (Figure 1). The train crew looked back and observed a large explosion and ensuing fire. They followed the emergency procedures and made the necessary radio broadcast. After the train came to rest, the crew disconnected the locomotives and the first 6 cars from the train, and travelled to a safe location east of the fire. There were no injuries, and there was no evacuation.
1 The term “key train” is defined as “an engine with cars
a) that includes 1 or more loaded tank cars of dangerous goods that are included in Class 2.3, Toxic Gases and of dangerous goods that are toxic by inhalation subject to Special Provision 23 of the Transportation of Dangerous Goods Regulations; or
b) that includes 20 or more loaded tank cars or loaded intermodal portable tanks containing dangerous goods, as defined in the Transportation of Dangerous Goods Act, 1992 or any combination thereof that includes 20 or more loaded tank cars and loaded intermodal portable tanks.” (Transport Canada, Rules Respecting Key Trains and Key Routes, Section 3.4) 2 The term “key route” is defined as “any track on which, over a period of one year, [the railway carries] 10,000 or more loaded tank cars or loaded intermodal portable tanks containing dangerous goods, as defined in the Transportation of Dangerous Goods Act, 1992 or any combination thereof that includes 10,000 or more loaded tank cars and loaded intermodal portable tanks.” (Transport Canada, Rules Respecting Key Trains and Key Routes, Section 3.3) 3 All mileages referenced are for the CN Ruel Subdivision. 4 All times are Eastern Standard Time.
2| Transportation Safety Board of Canada
- 2
Site examination The 7th through 35th tank cars had derailed (Figure 2). The 7th and 8th cars from the head end (VMSX 310740 and VMSX 311903) came to rest on their side at the east end of the derailment site, south of, and roughly parallel to, the track structure. Both cars had sustained minor damage and had separated from their trucks, but neither car released product. A gap of about 200 feet separated the 8th car and the 9th car. The 9th to the 12th cars came to rest to the south of the track, roughly parallel to the track structure, where melting snow and product had pooled to form a small pond. The 13th to 33rd cars sustained more significant damage and came to rest in various positions west of the pond in a pileup that extended westward for about 700 feet. The last 2 derailed cars, the 34th and 35th cars from the head-end, were derailed but were not damaged, and had remained upright near the track at the west end of the derailment. About 900 feet of mainline track was destroyed. Figure 1. Accident location (Source: Railway Association of Canada, Canadian Railway Atlas, with TSB annotations)
Railway Investigation Report R15H0013 | 3
Figure 2. Accident site diagram (Note: numbered tank car positions are accurate; positions of unidentified tank cars were approximated)
Nineteen of the tank cars released petroleum crude oil (UN 1267). During the derailment, 14 of the tank cars (13th to 16th, 18th to 21st, and 23rd to 28th cars) were breached and released product that pooled on both sides of the track. The pooled product ignited; the ensuing fire engulfed 5 additional tank cars, which sustained thermal tears. The 14th and 21st tank cars sustained both breaches and thermal tears. Approximately 1.7 million litres of product were released to either atmosphere or surface, and the fire burned for 5 days. The leading L1 wheel tread of the 8th car (VMSX 311903) exhibited impact marks that were consistent with contact with an exposed rail end. Circumferential abrasion marks were observed on the outboard rim face of the trailing L4 wheel, indicating that the wheel had dropped into gauge. Approaching the derailment site from the west, no impact marks were observed on the track infrastructure. At the west end of the derailment site, a broken insulated joint was observed in the south rail, near the signal mast at Mile 111.7 (Photo 1).
4| Transportation Safety Board of Canada
Photo 1. West portion of insulated joint assembly containing broken joint bars and intact rail recovered from the site
Both joint bars had broken into 2 pieces. The east portion of the joint assembly was not located, while the west portion of the joint bars remained attached to the rail. Rail end batter (REB) was observed on the head of the portion of rail that remained within the joint. The top of each remaining portion of joint bar exhibited beach marks, which are indicative of fatigue failure. Information written on the web of the rail indicated that a Sperry rail flaw test, conducted on 18 January, had identified a 3.5 mm REB condition at Mile 111.7. The rail components were sent to the Transportation Safety Board of Canada (TSB) Laboratory for further analysis. 1.3 Weather The temperature at the time of derailment was −31 °C. Weather in the 7 days following the derailment remained very cold (Appendix A).
Railway Investigation Report R15H0013 | 5
- 4
Dangerous goods The transportation of DGs5 is governed by federal regulations in Canada6 and in the United States (U.S.). 7 These regulations are based on the United Nations Recommendations on the Transport of Dangerous Goods. The products being transported in this occurrence were petroleum crude oil (UN 1267) and petroleum distillates (UN 1268). These products were both listed as Class 3 flammable liquids, packing group (PG) I, which is the most hazardous group of products in this class. Class 3 flammable liquids 1.4.1 Class 3 flammable liquids are DGs whose vapours can form an ignitable mixture with air at or below a temperature of 60 °C. These liquids can pose serious hazards due to their volatility and flammability, which are determined by the initial boiling point 8 and the flash point, respectively.9 Because the volatility and flammability of flammable liquids vary widely, Class 3 products are grouped together based on these characteristics so that different requirements, including packaging, storage, handling, and transportation, can be established. According to the Transportation of Dangerous Goods Regulations, Class 3 flammable liquids are divided into 3 PGs, ranging from PG I (highest hazard) to PG III (lowest hazard). The specific criteria for these PGs are: • PG I, if the flammable liquid has an initial boiling point of 35 °C or less at an absolute pressure of 101.3 kPa and any flash point. • PG II, if the flammable liquid has an initial boiling point greater than 35 °C at an absolute pressure of 101.3 kPa and a flash point less than 23 °C. • PG III, if the criteria for inclusion in PG I or PG II are not met. Petroleum crude oil 1.4.2 Petroleum crude oil has a wide range of flammability and volatility characteristics. The product is usually qualified in terms of sulphur content (low sulphur being “sweet” and high sulphur being “sour”) and density (light to heavy). The density of petroleum crude oil is
5 Dangerous goods are also referred to as “hazardous materials” or HAZMAT in the United States. In this report, the term “dangerous goods” is used, except when referring to United States regulations or standards. 6 The Transportation of Dangerous Goods Act and the Transportation of Dangerous Goods Regulations. 7 United States Code of Federal Regulations, Title 49 (49 CFR), Hazardous Materials Regulations. 8 The initial boiling point of a liquid mixture is the temperature value when the first bubble of vapour is formed from the liquid mixture, at a given pressure. The initial boiling point is a function of pressure and composition of the liquid mixture. 9 The flash point of a liquid is the minimum temperature at which the liquid gives off vapour in sufficient concentration to form an ignitable mixture with air near the surface of the liquid. A lower flash point represents a greater flammability hazard under laboratory conditions.
6| Transportation Safety Board of Canada
described in terms of its American Petroleum Institute (API) gravity10 (expressed in degrees), where a higher number indicates lower density. The thresholds defining “light,” “medium,” and “heavy” crude oil vary depending on the product’s region of origin and the organization making the determination.11 According to the train consist, all of the derailed cars in the occurrence were transporting petroleum crude oil (UN 1267). Emergency response procedures for petroleum crude oil 1.4.3 Guide 128 of the Emergency Response Guidebook12 identifies the potential hazards of petroleum crude oil products, which include petroleum distillates. Guidance is provided for emergency response and for ensuring public safety. Under the “Potential Hazards” heading,13 the guide states that • These products are lighter than water, are highly flammable, and will be easily ignited by heat, sparks or flames. • The product vapours are heavier than air; they will spread along the ground and collect in low or confined areas (e.g., sewers, basements or tanks). These vapours may form explosive mixtures with air, and may travel to a source of ignition and flash back. • These products are associated with a vapour explosion hazard indoors, outdoors or in sewers, and their containers may explode when heated. Under the “Emergency Response”14 and “Public Safety”15 headings, the guide states that • Water spray, fog or regular foam should be used to fight fire, but not straight streams of water. Because these products have a very low flash point, water spray may be inefficient; it may be necessary to use vapour-suppressing foam to reduce vapours. • An initial downwind evacuation for at least 300 metres (1000 feet) should be considered. • All ignition sources must be eliminated.
10 The American Petroleum Institute (API) gravity is a measure of a crude oil’s relative density in degrees API, as defined by the API. 11 Petroleum crude oil with an API gravity range above 32° to 37° is generally referred to as a “light” crude oil. Petroleum crude oil with an API gravity range below 20° to 26° is considered a “heavy” crude oil. 12 The Emergency Response Guidebook is a publication for first responders to refer to during the initial phase of a dangerous goods / hazardous materials transportation incident. The guidebook is jointly published by Transport Canada and the United States Department of Transportation (DOT) Pipeline and Hazardous Materials Safety Administration. 13 U.S. Department of Transportation and Transport Canada, 2016 Emergency Response Guidebook, Guide 128, “Flammable Liquids (Water-Immiscible),” p. 194. 14 Ibid., p. 195. 15 Ibid., p. 194.
Railway Investigation Report R15H0013 | 7
• All equipment used when handling the product must be grounded. • Responders must not touch or walk through spilled material. • The leak should be stopped if it can be done without risk. • Entry into waterways, sewers, basements or confined areas should be prevented. • Spilled product should be absorbed or covered with dry earth, sand or other non- combustible material, and transferred to containers. • Clean, non-sparking tools should be used to collect absorbed material. 1.5 National Fire Protection Association 472 Standard The National Fire Protection Association 472 Standard for Competence of Responders to Hazardous Materials/Weapons of Mass Destruction Incidents (NFPA 472) is the standard for emergency response agencies throughout North America. NFPA 472 specifies the minimum level of competencies required by responders to emergencies involving hazardous materials16 (HAZMAT) and weapons of mass destruction (WMD). These competencies are necessary for ensuring an effective risk-based response to these types of incidents. The standard includes competencies for • awareness level personnel; • operations level responders; • HAZMAT technicians; • incident commanders; • HAZMAT safety officers; and • other specialist employees.17 HAZMAT technicians and incident commanders have similar required competencies, including the abilities to
- analyze HAZMAT/WMD incidents to determine the complexity of the problem and
potential outcomes;
- plan a response within the capabilities of available personnel;
- implement the planned response consistent with the standard operating procedures
and the site safety and control plan;
- evaluate the progress of the planned response and modify the plan if necessary;
- terminate the incident by assisting in an incident debriefing and critique.18
16 Hazardous materials (HAZMAT) are also interchangeably referred to as dangerous goods. 17 National Fire Protection Association, NFPA 472 Standard for Competence of responders to Hazardous Materials/Weapons of Mass Destruction Incidents, 2013 edition, Chapter 1: Administration. 18 Ibid., Chapter 7: Competencies for Hazardous Materials Technicians, and Chapter 8: Competencies for Incident Commanders.
8| Transportation Safety Board of Canada
- 6
Approach to the management of occurrences involving dangerous goods at Canadian National Railway Company CN had implemented a DG management and response system under the direction of its vice- president safety and sustainability. Reporting to the vice-president safety and sustainability is an assistant vice-president safety and emergency response (AVP). The AVP leads a team of 3 senior DGOs who are responsible for oversight within their assigned regions: Western Canada, Eastern Canada, and U.S. Within each region, a team of DGOs reports to the senior DGOs. DGOs are stationed at most major terminals throughout CN territory with other staff at each terminal also trained to assist in the responses. The entire team is trained on the requisite NFPA 472 competencies for their positions. Recurrent training occurs every 3 years at the Association of American Railroads (AAR) Transportation Technology Center Incorporated Security and Emergency Response Training Center in Pueblo, Colorado, U.S. In 2006, the assistant vice-president safety and emergency response, who was already recognized as an expert in the field of emergency response involving DG, was recruited by CN and was tasked with developing the CN DG team, the CN emergency response plan, and the company-wide railway emergency response course. Each of these initiatives was based on established emergency response practices, company guidance and NFPA 472. At CN, the DGOs were equipped with: • hard copy reference material such as the Emergency Response Guidebook, the National Institute for Occupational Safety and Health manual, and various conversion charts; • fire turnout gear; • fire-retardant clothing; • self-contained breathing apparatus; • a multi-gas detector (lower explosive limit, oxygen, carbon monoxide and carbon dioxide); and • colorimetric tubes for sampling products that cannot be sampled using the multi-gas detector. CN DGOs were also equipped with a portable weather monitoring device capable of detecting wind speed and direction. This information can be useful for determining the direction in which the emergency responders should approach the accident site. In this occurrence, CN did not record any weather monitoring information. 1.7 Incident command When dealing with Class 3 flammable liquid products in an emergency response situation, industry best practice requires a formalized incident command (IC) structure to be established to manage the response.
Railway Investigation Report R15H0013 | 9
Since March 1990, 19 when IC was incorporated into law in the U.S., this formal structure has been used extensively by the military, firefighters, police services, and HAZMAT emergency response teams. IC was developed to organize people, equipment, and resources to respond to any emergency situation, including incidents that involve fire and DGs. In Canada, when IC is established for fire and HAZMAT incidents, the local fire chief or provincial official will normally be the authority having jurisdiction and will typically assume the role of incident commander. For railway accidents, if no other agencies respond, the senior railway company officer on site will implement IC to manage the emergency response and the related remediation activities. An effective IC will typically include, but is not limited to: • an incident commander who is responsible for overview of the incident; • IC staff with clear lines of responsibility and consisting of a public information officer, site safety officer, logistics and planning officer, and other positions, depending on the size and complexity of the incident; • a site perimeter with adequate security to control access; • a dedicated command post to facilitate meetings and briefings; • a controlled site entry access point; • a site access control system, with sign-in/sign-out sheets and tags to keep track of all personnel on site and coordinate activities; • oversight of all interventions to ensure that they are appropriate and use equipment that is compatible with the product involved (in the case of flammable liquids, this would include use of non-sparking tools, intrinsically safe electronics and grounded equipment to prevent igniting a flare-up); and • oversight of mitigation activities to ensure that they are properly coordinated, documented and supervised for safety. 1.8 Emergency response The accident occurred in a remote location about 90 km south of Timmins, Ontario. As the site was initially accessible only by rail (locomotive or hi-rail vehicle), access to the site and mitigation activities were hindered. The extreme cold and severe winter conditions, combined with the remoteness of the location, presented a number of challenges throughout the response. These challenges included: • access to the accident site (access improved once a road was cut into the site, providing access to vehicle traffic) • deployment of equipment for firefighting and site remediation • operation of equipment, and equipment freeze-up • access to shelter and recovery areas for response personnel
19 United States Code of Federal Regulations, Title 29, part 1910: Occupational Safety and Health Standards, subpart H: Hazardous Materials, standard 1910.120: Hazardous waste operations and emergency response (March 1990).
10| Transportation Safety Board of Canada
• communications being limited to satellite phone. In this occurrence, CN, as the primary response agency, implemented its incident command system. The CN senior vice-president, Eastern operations (SVPE), was the incident commander and was supported by the assistant vice-president safety and emergency response, DGOs, and other CN staff and contractors. Incident command documentation 1.8.1 By their nature, responses to derailments involving DGs can be dynamic and fluid, as situations can change at any time. After arriving at the occurrence site, it still takes some time to secure the site, set up an IC structure, get HAZMAT technicians on site, conduct initial reconnaissance activities, and plan and commence site mitigation activities. For each incident, CN protocols require that a detailed emergency response IC logbook be maintained to document the various site activities. The CN logbook was well structured and provided useful information and guidance for its completion. For example, guidance provided in the logbook indicated that all meetings were to be documented. CN risk- management personnel were tasked with completing the logbook. Once CN established the IC, the focus turned to constructing road access to the site and mobilizing response personnel and resources to help minimize environmental damage, control the pool fires, and begin track restoration. These activities would normally be documented in the logbook. However, for this occurrence, there were no logbook entries. As a result, there was little to no documentation of regular safety briefings to outline progress and challenges, or documentation of safe work plans to outline site mitigation activities during the entire response. Specifically, there were no detailed records of • site entry or monitoring of the affected cars; • wrecking activities; • any internal meetings or decisions; or • any meetings with or briefings provided to external parties. Accident site monitoring 1.8.2 Immediately following the derailment, fire erupted and engulfed many of the tank cars that had been breached. As the fire continued to burn, 7 tank cars ruptured (due to thermal tears) and released more crude oil to the environment (Photo 2).
Railway Investigation Report R15H0013 | 11
Photo 2. Derailment site with tank car burning from thermal tear (16 February 2015)
On 15 February, a CN portable command centre was dispatched to the site from Sudbury, Ontario. Once on site, it provided support for external satellite phone communication and a central meeting point for organizational planning. It also served to protect responders from the harsh elements and frigid temperatures. On 16 February, a second portable command centre arrived and was placed into service as site mitigation activities expanded. CN initially attempted to establish a formal sign-in/sign-out protocol for all personnel at the occurrence site. However, the process was not consistently adhered to, partly due to the remoteness of the location and the difficulty with entering and exiting the site. While the sign-in process improved somewhat after roadway access to the site was built and it was no longer necessary to transport all personnel to the site by locomotive or hi-rail, there was still no accurate record of who was physically on or off site. Dense smoke swirled throughout the area as the product continued to burn and site mitigation activities progressed. While DG protocols require responders to approach a DG site from an upwind position, no wind monitoring devices were being used.
12| Transportation Safety Board of Canada
Initially, many employees did not wear face masks or respirators to protect against airborne particulates from the fire or vapours from volatile organic compounds (VOCs)20 in the product (e.g., benzene). As a result, exposed skin, including the mouth and nose areas, on these employees was covered in soot by the end of their shift. Later in the response, dust masks were provided to employees to protect against particulates. Due to the nature of the released product, the site was monitored for VOC lower explosive limit 21 and hydrogen sulfide. CN DGOs and contractors also monitored benzene levels at the site every 30 minutes. However, the benzene level monitoring was valid only for the precise location at which it was recorded. The maximum recorded benzene level was reported to be 0.46 parts per million, which was well within the established short-term exposure limit 22 of 5 parts per million as averaged over a 15-minute period.23 However, half- or full-face cartridge-type respirators were not provided to employees to guard against potential repeated cumulative exposure to benzene during extended site mitigation activities. 1.9 Environmental impact Site description 1.9.1 The derailment occurred within a low-lying wetland area to the west and a forested area with a stream and lower-lying areas to the east. A small stream conveyed water from the western low-lying area to the east through a 40-inch culvert located beneath the tracks in the vicinity of the derailment. The stream tracked northward to the edge of the derailment area, then turned to the west past the site and eventually discharged into a pond that leads to Upper Kasasway Lake. The area of the derailment was covered with snow. The ground consisted of unconsolidated sand that was permeable to base rock. The water table was about 6 to 10 feet below ground surface. Subsequent to the derailment, a large pond of oil and water formed to the south side of the track where the culvert was blocked. CN’s environmental plan focused on surface runoff containment, because the product was assumed to be lighter than water.
20 Volatile organic compounds (VOCs) are a large group of carbon-based chemicals that evaporate easily at room temperature. While most people can smell high levels of some VOCs, other VOCs have no odour. 21 The lower explosive limit (LEL) is the lowest concentration (percentage) of a gas or vapour in air capable of producing a flash of fire in presence of an ignition source (arc, flame, heat). Concentrations lower than the LEL are “too lean” to burn. 22 The term “short-term exposure limit” is used in occupational health, industrial hygiene, and toxicology to define the acceptable average exposure limit to chemicals or products over a 15-minute period. 23 United States Code of Federal Regulations, Title 29, part 1910: Occupational Safety and Health Standards, subpart Z: Toxic and Hazardous Substances, standard 1910.1028: Benzene.
Railway Investigation Report R15H0013 | 13
Surface water monitoring program 1.9.2 Impacted surface water was limited to areas where crude oil came in contact with the surface. A surface water sampling program was begun in the vicinity of the derailment, including the channel leading towards Upper Kasasway Lake and several locations within Upper Kasasway Lake. Initially, daily observations were made at each location to check for any visual or olfactory impacts. Following consecutive rounds of sampling with no impacts found, sampling frequency was reduced to twice per week until the late fall of 2015. Surface water monitoring resumed in the spring of 2016 and, as of 01 July 2016, will continue on a quarterly basis for an indefinite period. Wastewater treatment and water diversion activities 1.9.3 Mobile wastewater treatment units (MTUs) were sent to the accident site. All MTUs, which were provincially governed and approved, were operated under a mobile Certificate of Approval or Environmental Compliance Approval. The containment sampling requirements and discharge criteria had been strictly adhered to before the treated water was discharged. A total of 3 MTUs were installed in series, and all recovered impacted water was treated. The treated water was then discharged back into the natural environment. Groundwater monitoring program 1.9.4 A total of 17 groundwater monitoring wells were installed to verify the direction of groundwater flow and groundwater depth, and to determine if groundwater had been impacted. Groundwater depth was about 2.5 m to 3.5 m below ground surface. Impacted groundwater was limited to areas where crude oil surfaced on ground water. Contaminants were successfully removed during soil remediation in the areas east and west of the track bed. Groundwater monitoring was completed for the winter in November 2015. By that time, there was no further detection of crude oil contaminants in the groundwater. In the spring of 2016, the groundwater monitoring resumed. As of 01 July 2016, no negative environmental impact to the ground water had been detected. Soil excavation and containment 1.9.5 A significant volume of contaminated soil had to be removed from the derailment site by truck. This activity was hampered by limited roadway access to the site and the limited number of local landfill facilities that were able to accept waste soil. Subsequently, a total of 13 lined soil containment cells were constructed to store contaminated soil until it could be transported to an approved landfill site. Each containment cell held about 2500 tons (5000 m3) of soil. In the spring of 2016, the Ontario Ministry of Environment and Climate Change designated the soil as non-hazardous waste; all excavated soil was removed from the accident site and transported by truck to approved landfill sites.
14| Transportation Safety Board of Canada
Site restoration 1.9.6 CN submitted a detailed restoration plan to all regulatory agencies and the Mattagami First Nation for consideration and comment. Forest restoration, which included a diverse planting program to return the lost vegetation species that were native to the area, was completed with the assistance of the local Mattagami First Nation in the spring of 2016. On 27 May 2016, CN submitted an environmental closure report to the Ontario Ministry of the Environment and Climate Change as part of the approval process for site closure. Contingent upon the results of a final round of water testing, scheduled for the fall of 2016, site closure was expected to be granted. However, the 17 groundwater wells installed at the accident site will continue to be monitored quarterly for an indefinite period. 1.10 Class of track All railway lines are defined as a particular class of track that is related to the condition or maintenance level of the track. The Transport Canada (TC)–approved Rules Respecting Track Safety, also known as the Track Safety Rules (TSR), define classes of track and the associated maximum permitted train speeds for each class. Under the TSR, the lowest class of track is Class 1, which restricts freight train speed to a maximum of 10 mph, and the highest class of track is Class 5, which has a maximum permitted freight train speed of 80 mph. 1.11 Subdivision information CN’s Ruel Subdivision consists of a single main track that extends westward from Capreol, Ontario (Mile 0.0), to Hornepayne, Ontario (Mile 296.2). Train movements on the subdivision are governed by centralized traffic control, as authorized by the Canadian Rail Operating Rules (CROR), and supervised by a rail traffic controller located in Toronto, Ontario. In the vicinity of the derailment, the track is Class 3. The authorized track speed is 40 mph for freight trains and 45 mph for passenger trains. Traffic on the Ruel Subdivision consisted, on average, of 18 freight trains per day. A VIA Rail Inc. passenger train operated westbound on Wednesdays and Sundays, and eastbound on Wednesdays and Fridays. The track throughout the derailment area is tangent single mainline generally oriented in an east-west direction. It consists of 136-pound continuous welded rail (CWR) manufactured by Sydney in 1996. Rail wear was measured at 6 mm, which was less than 75% of the vertical condemning limit. The rail was laid on 14-inch double-shoulder tie plates and anchored to concrete ties with Pandrol clip fasteners. The ballast was crushed rock. The shoulders were about 16 inches wide, and the cribs were full. Between 2010 and 2014, rail freight traffic on the Ruel Subdivision had increased from 32.8 million gross ton-miles per mile (MGTM/M) to 47.1 MGTM/M (Table 1). During the same period, the number of carloads of petroleum crude oil had increased from 62 to 75 186.
Railway Investigation Report R15H0013 | 15
Table 1. Freight and crude oil traffic on the Ruel Subdivision Year Freight (MGTM/M)* Freight GTM (thousands) Crude oil GTM (thousands) Crude oil (carloads) Crude oil (MGTM/M) 2010 32.8 9 709 654 2 263 62 0.007 2011 35.3 10 452 629 71 369 2 843 0.240 2012 36.8 10 897 795 459 077 19 399 1.549 2013 37.2 11 013 838 835 271 34 384 2.819 2014 47.1 13 956 400 1 937 152 75 186 6.540
- The terms million gross tons (MGT), million gross ton-miles (MGTM) and million gross ton-miles per mile
(MGTM/M) are used interchangeably in the rail industry. 1.12 Rail joints Rail joints secured with joint bars are a track surface discontinuity that can result in excessive dynamic loads at the joint due to wheel impact if the joint is not properly supported or maintained. A properly maintained joint would be firmly supported on sound ties sitting on well-tamped, free-draining, clean ballast. If joints are not properly supported or maintained, higher wheel impact forces can be generated. This can lead to increased vertical rail deflection, loosening and deterioration of the joint assembly, REB, and degradation of the ties, ballast, and subgrade under the joint. Insulated joints are a type of rail joint installed at track circuit limits to electrically isolate sections of track (blocks) in signaled track. These joints are typically assembled in a factory by bolting together 2 pieces of rail with joint bars. The rails and joint bars are isolated by positioning an epoxied insulating material between them. Insulated fiber bushings and washer plates are used to isolate the bolts from the bars. Insulated joint failures are typically electrical failures caused by glue de-bonding, insulator failures from component breakage and wear, or mechanical failures resulting from the failure of the joint bars caused by dynamic loading. 1.13 Rail end batter and localized surface collapse REB occurs at a rail joint when the ends of the rail heads within the joint are mismatched or the gap between the rail ends is too large. REB is indicative of degrading joint support that can result in excessive joint movement. Poor joint support, which usually occurs due to fouled ballast, deteriorated ties or loose fastening, is the primary cause of joint failure. The average life of an insulated joint in North America is about 200 million gross tons (MGT).24 This service life is lower than that of most of the other running surface components of the track infrastructure. A localized surface collapse (LSC) in a rail is characterized by plastic metal flow, leading to the flattening out and deformation of the rail head above the plane of the rail head/web
24 Transport Technology Center Inc., Technology Digest TD04-06 (May 2004).
16| Transportation Safety Board of Canada
fillet. LSCs are normally caused by mechanical interaction from repetitive wheel loadings. As an LSC becomes more severe and vertical wear of the rail head increases, wheel impact forces also increase. This can result in high contact stresses and lead to the development of other rail defects. In particular, LSC and REB conditions commonly develop as a result of poor track support (low spots or low surface); this contributes to increased wheel impacts, which can lead to potentially catastrophic rail component fatigue defects. The TSR contains no guidance or condemning criteria with regards to REB or LSC. In Canada, these are categorized as rail surface conditions rather than rail defects. While they are not considered as service failures, these rail surface conditions are indicative of potential emerging rail defects. As specified in CN Engineering Track Standards (ETS), track standard (TS) 1.7 – Rail Testing and Remedial Action for Broken Rail: • Item 10a requires the monitoring of LSC conditions that are less than 5 mm in depth, on rail worn to less than 75% of the vertical rail wear condemning limit. • Item 10b outlines the limits for REB in the winter months:
During the winter months (as determined by the Regional Chief Engineer), the following applies to in-track rail joints in Class 3 track and greater with annual MGT’s of 10 or greater.
If joint rail end batter is found to be it. [sic]
- 5 mm
4 mm = 5 mm
• Must be measured twice a week. •Must be changed out within 48 hours. • If rail cannot be changed, place a 40 mph TSO [temporary slow order] until it is changed out. • 30 mph • Must be changed within 48 hours - no exceptions.
The depth of an LSC or REB is measured using a straight edge, as shown in Figure 3.
Railway Investigation Report R15H0013 | 17
Figure 3. Diagram from Canadian National Railway Company Engineering Track Standards, Track Standard 1.7, Item 11, showing how to determine the depth of crushed heads, localized surface collapse, and rail end batter 1.14 Track inspection For federally regulated track, the minimum regulatory requirements for track inspection are set out in the TSR. Where track is identified as not meeting the track safety rules, the railway company must immediately bring the track into compliance or halt operations over that line of track. 25 Track geometry inspection 1.14.1 According to the TSR, for Class 3 track with more than 35 MGT of annual traffic, a track geometry inspection must be performed at least 2 times a year. The TSR indicate that any deviation from uniform profile on either rail at the mid-ordinate of a 62-foot chord may not be more than 2¼ inches. As specified in CN ETS, TS 7.1 – Track Geometry:
25 Transport Canada, Rules Respecting Track Safety (25 May 2012), Part I: General, section 6.2: Responsibility of the Railway Company, page 6.
18| Transportation Safety Board of Canada
- Deviations exceeding Transport Canada Track Safety Rules […] for track
geometry are defined as “URGENT” defects.26 TS 7.1 further indicates:
- Where a portion of the track exceeds the limits defined as “URGENT”, one
of the following actions must be immediately taken before the operation of the next train over the defect(s): i. the defect(s) must be repaired to within the allowable tolerance; ii. […] if the defect is a speed-related type, a temporary slow order (TSO) must be placed restricting trains to a maximum speed which is within the track class allowed for the severity of the defect(s) […]; or iii. operation over the track must be halted. 27 Deviations approaching track geometry limits specified in the TSR are defined as “near- urgent” conditions. CN TS 7.1, Item 3 states that: i. NEAR-URGENT conditions will be identified by the Geometry Car and must be inspected within 72 hours and remedial action must be taken within 30 days. 28 TS 7.1 further states that:
- Deviations exceeding CN recommended maintenance tolerances are
defined as “PRIORITY” conditions. a. Where a portion of track exceeds the limits defined as priority, the condition must be monitored until it is repaired to ensure it does not escalate to an “URGENT” defect.29 Priority surface conditions are defined in TS 7.1, according to which the deviation from uniform profile on either rail at the mid-ordinate of a 62-foot chord may not be more than 1¼ inches for Class 3 track. 30 Table 2 provides a summary of CN priority, near-urgent, and urgent geometry defects on the Ruel Subdivision from 2011 to 2014.
26 Canadian National Railway Company, Engineering Track Standards (June 2011), TS 7.1: Track Geometry, p. 137. 27 Ibid. 28 Ibid. 29 Ibid. 30 Ibid., p. 144.
Railway Investigation Report R15H0013 | 19
Table 2. Geometry defects on the Ruel Subdivision from 2011 to 2014 Defect type 2011 2012 2013 2014 Priority 14 538 30 634 13 827 9 053 Near-urgent 5 030 11 971 5 326 2 289 Urgent 390 892 308 302 Total 19 958 43 497 19 461 11 644 On the Ruel Subdivision, track geometry testing was carried out 4 to 6 times per year.31 The most recent track geometry car inspection had been completed on 02 November 2014, about 3 months before the derailment. During this inspection, a 1-inch surface low spot was identified on the south rail at the insulated joint, at Mile 111.7. However, no action was taken to address the track condition, nor was any action required to be taken, because it did not exceed the TSR urgent criteria (2¼ inches) or CN’s priority criteria (1¼ inches). Rail flaw inspection 1.14.2 According to the TSR, on Class 3 track with more than 35 MGT of annual traffic, a rail flaw inspection must be performed at least 2 times a year. Inspection equipment must be capable of detecting rail defects in the area enclosed by the joint bars. The TSR does not identify REB as a rail defect. CN performs rail flaw inspections on the Ruel Subdivision approximately every 20 days throughout the winter months, and every 37 days throughout all other seasons.32 The 2 most recent rail flaw inspections had been completed on 18 January 2015 and on 07 February 2015. The 18 January 2015 inspection identified a 3.5 mm REB condition at the insulated joint in the south rail, at Mile 111.7. The 07 February 2015 test did not identify any defects in the area. The REB condition was not yet at a limit that required monitoring according to the CN ETS. However, as a precaution, the assistant track supervisor (ATS) responsible for the territory began monitoring the REB condition twice weekly. As this condition had previously been detected, documented, and marked on the rail, the REB condition was not included in the 07 February 2015 rail flaw inspection report. 33 Between January 2014 and March 2015, rail flaw testing on the Ruel Subdivision identified 570 flaws (Table 3), which included 332 LSCs, 87 REBs, and 19 crushed heads. These rail surface conditions required a significant amount of monitoring, repair work, or both, for inspectors and maintenance crews.
31 Canadian National Railway Company, Corridor Risk Assessment Toronto – Winnipeg (23 June 2014), p. 24. 32 Ibid. 33 Previously identified rail end batter and local surface collapse conditions are not repeatedly flagged on subsequent rail flaw inspection reports as the conditions should be monitored by track maintenance personnel.
20| Transportation Safety Board of Canada
Table 3. Summary of rail surface conditions and rail defects detected on the Ruel Subdivision between January 2014 and March 2015 Rail surface condition or rail defect Number Percentage of total* Bolt hole 31 5% Crushed head 19 3% Defective weld – field 35 6% Defective weld – plant 8 1% Detail fracture 12 2% Horizontal split web 3 1% Horizontal split head 7 1% Localized surface collapse 332 58% Rail end batter 87 15% Split web 5 1% Vertical split head 31 5% Total 570 100%
- Some values have been rounded.
Visual inspection 1.14.3 1.14.3.1 Track According to the TSR and CN ETS TS 7.0 – Track Inspection Guidelines,34 on Class 3 track with more than 35 MGT, a visual track inspection must be performed at least 2 times a week. However, during the winter of 2015, CN instituted a requirement for daily track inspections in the Northern Ontario Zone, because of the temperature and snow conditions. The most recent visual track inspection had been completed by the ATS on 12 February 2015. During this inspection, the REB at the insulated joint at Mile 111.7 was visually inspected, but not measured, and was found to not be progressing. The REB was last measured at 3.5 mm on 07 February 2015, during the rail flaw inspection. No records of the REB measurements at this joint during visual inspections were kept, nor were they required to be. 1.14.3.2 Joint inspection requirements under the Track Safety Rules Subpart D - Track Structure, Section V - Rail Joints, states that (a) Each rail joint, insulated joint, and compromise joint must be of the proper design and dimensions for the rail on which it is applied.
34 Canadian National Railway Company, Engineering Track Standards, TS 7.0: Track Inspection Guidelines, Item 1a. states that “minimum track inspection frequencies in Canada shall be as outlined in the Transport Canada Track Safety Rules.”
Railway Investigation Report R15H0013 | 21
(b) If a joint bar on Classes 3 through 5 track is cracked, broken, or because of wear allows vertical movement of either rail when all bolts are tight, it must be replaced. (c) If a joint bar is cracked or broken between the middle two bolt holes it must be replaced. 35 Subpart F – Inspection, Section 2. Track – Inspections, Item 2.5 Walking Track Inspection provides the following: (a) A Walking Track Inspection must be completed on all jointed tracks and concrete tie tracks where curvature is 4 degrees or greater. If joint bars are inspected electronically including the use of camera or other technology capable of detecting joint bar defects, a Walking Track Inspection of tangent track and curves less than 4-degree curvature in jointed track territory is not required; however, a Walking Track Inspection on all tracks with curves of 4 degrees or greater must be completed.36 1.14.3.3 Joint inspection requirements at Canadian National Railway Company Item 6 of the CN ETS TS 7.0 – Track Inspection Guidelines states (in part) that Each joint bar in CWR shall be inspected on foot each calendar year at the frequency indicated by class of track and annual tonnage […]37 For Class 3 track with more than 40 MGT to 60 MGT, the rail joints must be inspected twice annually. There was no record of any yearly on-foot joint inspection in the vicinity of the insulated joint. The same standards provide guidance on what action to take when a track condition is noted at a joint in CWR that does not require regulatory action. Item 8 of the CN ETS TS 7.0 – Track Inspection Guidelines states (in part):38
35 Transport Canada, Rules Respecting Track Safety, part II: Track Safety Rules, subpart D: Track Structure, section V: Rail Joints. 36 Ibid., part II: Track Safety Rules, subpart F: Inspection, section 2: Track – Inspections, item 2.5: Walking Track Inspection. 37 Canadian National Railway Company, Engineering Track Standards (June 2011), TS 7.0: Track Inspection Guidelines, item 6, p. 124. 38 Ibid., item 8, pp. 126–127.
22| Transportation Safety Board of Canada
If any of the following conditions […] are found at a joint in CWR and are not a regulatory defect and cannot be corrected immediately, on foot follow up inspections will be required until such time as the condition is corrected. Table 4 Rail Joint Conditions and Remedial or Corrective Actions [adapted table39] Rail Joint Condition Action Visible cracks in joint bar Replace bar Rail end batter (More than 5/16” [8.0 mm] in depth and more than 6” in length measured with a 24” straight- edge) Repair by welding joint or removing rail.* Joint vertical movement (profile) that exceeds 75% of the allowable threshold for the designated class of track. Surface joint.*
- Or conduct follow-up inspections every other week until defect is repaired or removed.
The ATS reportedly carried out a visual inspection of the REB within the joint on 12 February 2015 as part of the regular twice-weekly visual inspections from a hi-rail vehicle. Track inspection guidelines at Canadian National Railway Company 1.14.4 CN’s Track Inspection Guidelines course 00022E, Track Inspection, Module 5, instructs employees in • assembly of rail joints; • minimum number of bolts for a rail joint; • rail end mismatch; • REB requirements; • geometry defects due to low joints; and • requirements of CN ETS TS 7.0 - Track Inspection Guidelines. The Track Inspection Guidelines and CN ETS TS 7.0 discuss remedial action for various joint conditions. Joints with fouled ballast in conjunction with vertical movement (profile) that exceeds 75% of the allowable threshold for the designated class of track must be surfaced. The guidelines do not discuss surfacing of joints with vertical movement less than 75% of the allowable threshold for the designated class of track (i.e., a 1-inch low spot), even though low joints are usually the underlying cause of more serious joint defects.
39 Table 4 in Item 8 of the CN ETS TS 7.0 – Track Inspection Guidelines lists 13 rail joint conditions and corresponding action to take. The 3 examples shown here are the conditions present in this occurrence.
Railway Investigation Report R15H0013 | 23
Joint bar inspection systems 1.14.5 A machine vision–based system for joint bar inspection that uses high-speed cameras at speeds of up to 70 mph has been developed by the Federal Railroad Administration Office of Research and Development and ENSCO, Inc. The system features 4 linescan cameras mounted on a hi-rail or rail-bound vehicle that continuously capture high-resolution images from both sides of each rail. An on-board computer system automatically saves each joint bar image and analyzes it for visible fatigue cracks. The images can also be analyzed for missing bolts and other visible joint bar and rail defects. However, only cracks that extend to the outside (exposed) surface of the joint bars are visible to the cameras. When a potential defect is detected, the system provides an audio warning, tags the image with a global positioning system (GPS) position, and displays the joint bar image with the defect highlighted on the screen. An operator then confirms or rejects the defect. At the end of the inspection, a report can be generated with the joint bar GPS location and related defects. Herzog Services Inc. (Herzog) and Sperry Rail Service 40 have equipped some of their rail flaw (ultrasonic/induction) testing vehicles with this system. In addition, the Transportation Technology Center Inc. and Herzog have developed a non- destructive ultrasonic inspection system to detect joint bar flaws in the area of the joint bar that is masked by the railhead to web radius and cannot be inspected by visual or optically aided inspection techniques.41 This system uses ultrasonic transducers mounted into a sliding fixture or roller search unit to scan along the outside of a joint bar while introducing pulsed sound waves across the bar in order to detect flaws and cracks located at the top inside surface of the joint bar. This makes it possible to detect cracks located on the top inside surface of the middle portion of the joint bar, where 95% of fatigue cracks initiate.42 At the time of the occurrence, CN was using neither the machine vision nor the ultrasonic joint bar inspection technologies. 1.15 Impact of cold weather on track infrastructure During periods of severe cold temperatures, the track and infrastructure are less able to endure in-service forces, withstand damage and avoid breakage. Rail and joint bar steel is known to have reduced fracture toughness and ductility at low temperatures, particularly when defects are present or when rail joints are subjected to significant stress due to contraction of CWR in cold weather. To minimize the effects of cold
40 Sperry Rail Service is a contract service provider to the rail industry that inspects railroad track for subsurface flaws with a fleet of specialized test vehicles using proprietary technology and data management systems. 41 Garcia, Greg. “Automated Ultrasonic Inspection Detects Cracks in Joint Bars: TTCI and Herzog Study Nondestructive Inspection Methods for Joint Bars in Service Utilizing Ultrasonic Technology.” Railway Track and Structures, June 2010 and April 2011. 42 Transportation Technology Center, Inc., Technology Digest 08-040: Evaluation of Feasibility of Automated Joint Bar Inspection.
24| Transportation Safety Board of Canada
weather damage to track infrastructure, CN developed an extreme cold weather inspection policy. Specifically, CN ETS TS 7.0, Track Inspection Guidelines, item 34, states:43 Daily cold weather track inspections will be under taken on core lines under the following conditions: [adapted table44] Territory Track Conditions Extreme Low Temperature Canadian Lines All Track less than -30°C CN has also established a cold weather temporary speed restriction. Item 37 of the CN ETS TS 7.0 - Track Inspection Guidelines states: In areas identified as having rail with a history of frequent defects (a list of such areas will be generated by headquarters engineering each year) the following cold weather temporary speed restrictions will be put in place: When temperature is below −25°C in Canada or −10°F in the U.S. all freight trains shall be restricted to a speed or 40 mph or track speed whichever is more restrictive […]45 At the time of the derailment, the daily cold weather inspections had been conducted, train speed was restricted to 40 mph, and train length was restricted to 10 000 feet. 1.16 Canadian National Railway Company Engineering Notice 2015-E- 01 On 15 January 2015, in response to the number of crushed rail heads, LSC and REB conditions identified through rail flaw testing, CN’s Eastern Regional Chief of Engineering issued Notice 2015-E-01 (Appendix B). The notice required that all crushed heads, LSCs and REB conditions over 3 mm be measured and inspected within 96 hours, and a list sent to the assistant chief engineering and the regional chief engineering by 20 January 2015. The notice required remedial action in accordance with the winter standards outlined in TS 1.7. The notice emphasized that the use of slow orders should be seen as a last resort in addressing these types of defects, stating: Under no circumstances will we compromise safety and the integrity of our track, however all attempts must be made to remove rail and/or geometry conditions prior to putting on a TSO.46
43 Canadian National Railway Company, Engineering Track Standards (June 2011), TS 7.0: Track Inspection Guidelines, item 34, p. 134. 44 The extreme cold weather inspection policy in Item 34 of the CN ETS TS 7.0 lists 4 territories and the conditions that must be met for an inspection to be performed. The territory and conditions shown here are the ones relevant to this occurrence. 45 Canadian National Railway Company, Engineering Track Standards (June 2011), TS 7.0: Track Inspection Guidelines, item 37, p. 135.
Railway Investigation Report R15H0013 | 25
CN reported that the directive was not prompted by any particular concern about increased REB or rough spots. Rather, it was intended to help stay ahead of any potential acceleration of rail surface conditions. 1.17 Employee development CN had recently experienced a large turnover in personnel. Approximately 50% of CN’s 25 000 employees had been hired within the previous 5 years.47 In 2014, CN opened 2 new training centres to deal with the transition to a younger, more diverse workforce. A training centre for Canadian employees was located in Winnipeg, Manitoba, and a training centre for American employees was located in Homewood, Illinois. Each training centre offered courses for new and seasoned railroaders in trades such as locomotive engineers, conductors, car mechanics, track maintainers, track inspectors, and signal maintainers. Employees received hands-on training in modern indoor laboratories with up-to-date equipment and modern teaching techniques. About 3000 employees per year were being trained at these new centres. Engineering employee development and training path 1.17.1 Unionized engineering employees were initially hired as track maintainers. Track maintainer training consisted of a 3-week course at CN’s training centre in Winnipeg. The first week covered general introductory topics related to working for CN, the second week was specific to the role of a track maintainer, and the third week was devoted to CROR training. Candidates were required to pass an exam related to track maintenance at the end of the second week to be allowed to continue with rules training. There were very few failures at this stage of the training. An exam related to the CROR was administered at the end of the third week. About 75% of the candidates successfully passed the rules exam on their first attempt. Candidates who were unsuccessful could attempt the test a second time after 90 days of field experience. The success rate on the second attempt was approximately 95%. Once qualified as track maintainers, employees could bid to become a track foreman (TF). The TF course was a 10-day course that incorporated a number of mandatory courses, including track inspection guideline training and CWR training. TFs were required to renew their track inspection guideline and CWR training every 3 years; this was tracked through CN’s training management system. The ATS position was the first level of management within CN’s engineering organization. About 50% of the candidates for training as an ATS were drawn from the ranks of unionized employees. The remaining 50% were external, newly hired candidates from outside CN.
46 Canadian National Railway Company, from Regional Chief, Engineering, to all Engineering employees, Eastern Region, Notice No. 2015-E-01: Subject: Crushed Heads, Rail Joints, Insulated Glued Joints (15 January 2015). 47 Canada. Parliament. House of Commons. Standing Committee on Transport, Infrastructure and Communities (SCOTIC). Evidence. Issue No. 049, 24 March 2015. 41st Parliament, 2nd Session.
26| Transportation Safety Board of Canada
Although previous experience in track or supervisory positions was preferred, ATS candidate profiles varied. ATS candidates were enrolled in a training program for up to 52 weeks. The training consisted of 7 instructional blocks of 10 to 13 days each, which were delivered at the Winnipeg training centre. These instructional blocks were interspersed with blocks of on-the- job training (OJT). Overall, the training program included about 14 weeks of classroom training and about 36 weeks of OJT, although the length of OJT could vary. When candidates had completed the training, they would have had the 1 year of experience required to qualify as a track inspector. Table 4 provides a general outline of the ATS training program. Table 4. Outline of the Canadian National Railway Company’s assistant track supervisor training program Block and location of training Number of weeks Primary focus Topics Classroom Block 1 2 Orientation Employee orientation and occupational health and safety. New employees also take the 1-week track maintainer course as part of this module. A half day is also included under “leadership” for labour relations orientation. On-the-job training (OJT) Block 1 4
Classroom Block 2 2 Rules 5 days of rules training, and 4 days of occupational health and safety training and fleet management training. OJT Block 2 4
Classroom Block 3 2 Track Track, including track inspection guidelines, continuous welded rail, movement over broken rail, etc. OJT Block 3 4
Classroom Block 4 2 Leadership Leadership training, efficiency testing, and boom truck operation. OJT Block 4 4
Classroom Block 5 2 Track Training devoted to track, which includes geo- technology and advanced track inspection guidelines. OJT Block 5 8
Classroom Block 6 2 Canadian Rail Operating Rules Canadian Rail Operating Rules for supervisors. OJT Block 6 10 to 12
Classroom Block 7 2 Track Additional training on track maintenance and track inspection guidelines. During the blocks of OJT, ATS candidates were provided with a checklist that included 16 track-inspection skills and 8 job skills on which they were to try to gain experience. There
Railway Investigation Report R15H0013 | 27
were also a number of activities that the candidates were to try to observe by the end of the training program. However, the onus was on the candidates to seek opportunities for exposure to these items during their time in the field. There was no formal review or assessment of candidate performance on the skills listed in the checklist during the OJT. An ATS usually reports to a track supervisor (TSPVR). TSPVRs are usually promoted from within the ranks of the ATS, and the training requirements are the same for both. Assistant track supervisor mentoring 1.17.2 Even an inexperienced ATS must be able to assess combinations of conditions and defects in order to appreciate the overall effect on the track structure and to anticipate how those elements may contribute to bigger problems if left unattended. While individual defects can be assessed against set track criteria, managing combinations of conditions and emerging defects (i.e., priority and near-urgent) requires greater experience and judgment. One of the challenges in training ATS candidates with little railway experience was helping them obtain the experience and judgment necessary to assess track conditions and defects. To help them gain this experience, and to augment the ATS classroom and OJT programs, CN had a mentoring program in place, in which CN TSPVRs and senior manager engineering (SME) personnel were expected to mentor the employees who reported to them, in addition to their track maintenance duties. Since 2013, CN had been delivering a communication and leadership program entitled LEAD to front-line supervisors and mid-level managers. The full LEAD program, which included some mentoring, consisted of 4 days of supervisory training that emphasized positive relationships and communication styles to involve and engage employees. At the time of the accident, neither the TSVPR nor the ATS had received this training. Effective mentoring for developing expertise 1.17.3 Research on the development of proficiency in situations requiring judgment and the management of complex problems has highlighted the importance of mentoring in providing feedback to novices as they deal with increasingly complex situations. The keys to effective mentoring have been shown to include the ability to • develop with the learner a positive relationship that encourages learning; • understand the reasons for learner difficulties; and • tailor the learning approach to suit the learner. A mentor’s ability to cultivate an appropriate environment for learning requires the organization’s commitment to provide the resources and skills necessary for effective mentoring. 48
48 Hoffman, R. and Feltowich, P. Accelerated Proficiency and Facilitated Retention: Recommendations Based on an Integration of Research and Findings from a Working Meeting. (Air Force Research Laboratory, 2010), Final Report AFRL-RH-AZ-TR-2011-0001, p. 53.
28| Transportation Safety Board of Canada
- 18 Track maintenance on the Ruel Subdivision
CN’s Ruel Subdivision extends westward for 296.2 miles from Capreol (Mile 0.0) to Hornepayne (Mile 296.2). To facilitate track maintenance activities, the subdivision is divided into an eastern portion (from Mile 0.0 to Mile 183.2) and a western portion (from Mile 183.2 to Mile 296.2). On the eastern portion of the Ruel Subdivision, a TSPVR and 2 ATSs were responsible for all maintenance activities, including the supervision of all related engineering maintenance personnel. One ATS was responsible for about 87 miles at the east end of the eastern portion, and the other ATS was responsible for about 97 miles at the west end of the eastern portion. Track maintenance personnel consisted of about 18 to 24 permanent employees during the summer. About 34 temporary employees were added during the winter. The TSPVR reported to the SME for the Northern Ontario Zone. The SME was 1 of 4 CN SMEs within the province of Ontario. The SME was responsible for a territory that included parts of the Bala, Caramat, and Newmarket Subdivisions, as well as all of the Ruel and Soo Subdivisions. The SME reported to 1 of 2 assistant chief engineers for CN’s eastern region, who in turn reported to the eastern regional chief, engineering. Senior manager engineering 1.18.1 The SME in place at the time of the derailment had begun working for CN in 1979, and moved into a management position in 2009 as a construction supervisor. In late 2009, the SME was promoted to the position of production manager, and in December 2014, was promoted to the SME position. The previous SME had begun working for CN as a trackman in 1981 and had served 21 years as a gang foreman. In 2005, he became a TSPVR, and in 2008 was promoted to the SME position. Track supervisor 1.18.2 The TSPVR had begun working for CN as an ATS in southern Ontario in May 2007. On 15 October 2013, he was promoted to TSPVR for the eastern portion of the Ruel Subdivision, based out of Foleyet, Ontario (Mile 148.3). Before the occurrence, there had been no performance- or competence-based issues identified in relation to the TSPVR’s work. Given the high workload on the Ruel Subdivision, there was little time and few opportunities for the TSPVR to properly instruct and mentor the ATS. Assistant track supervisor 1.18.3 The ATS had begun working for CN in February 2013 as an assistant track foreman. In May 2014, he was promoted to ATS on the Ruel Subdivision based out of Foleyet, Ontario, and began the CN ATS training program. Between May 2014 and February 2015, the ATS carried out the duties of his position while completing the OJT blocks of the ATS training
Railway Investigation Report R15H0013 | 29
program. During that time, the ATS frequently returned to CN’s training centre in Winnipeg, Manitoba, to complete the classroom blocks of the training. From May 2014 to December 2014, the ATS worked for the previous SME. During this time, the ATS had little contact with the SME. Starting in December 2014, following the change in SME, the ATS had more contact with the SME, who was generally more responsive to his workload and resource concerns. While the ATS was identified as having potential to advance within management, the ATS resigned shortly after the occurrence and returned to the unionized ranks of CN. The demands of the ATS position, combined with a lack of adequate mentoring and support, contributed to the decision. Track maintenance challenges on the Ruel Subdivision 1.18.4 CN identifies train velocity49 as an issue having a significant influence on the use of assets and cost control, 2 of CN’s 5 strategic business pillars.50 All engineering employees understand the sense of urgency to move trains as quickly and as safely as possible. Train delays that affect velocity create inter-functional pressures within the company. These pressures can sometimes create conflict between track maintenance decisions and train operations. Due to the importance of keeping trains moving, it can be challenging for track maintenance personnel to obtain adequate track time to conduct the required track inspections, maintenance and repairs. An employee who is relatively new to front-line management can be particularly influenced by this level of pressure, recognizing that it is driven from the highest operating levels within the company. In this occurrence, the SME regularly inspected the Ruel Subdivision by hi-rail every 2 to 3 weeks. The overall assessment of the track by the SME and by the previous SME was that the track was in reasonably good shape. Both also considered the number of defects to be decreasing, and that the track and surface were in good condition. When the incoming SME arrived in December 2014, the SME had implemented a work reporting system to get a better appreciation of the operating challenges on the territory. After reviewing these work reports, the SME identified that engineering personnel had been having difficulty getting enough track time to complete patrols and to conduct necessary track work. The TSPVR had worked on the territory since October 2013 and also believed that the overall condition of the territory was improving, particularly after the installation of 860 new concrete ties the previous year. However, given the large number of track geometry defects, the focus had been on remediating the urgent and near-urgent defects, and it was difficult to address priority defects. In the months before the derailment, the large number of LSC and REB conditions that had been identified through rail flaw testing and required monitoring
49 Train velocity is the ability to move trains to destination as quickly and safely as possible. (Source: Canadian National Railway Company, How We Work and Why.) 50 Ibid.
30| Transportation Safety Board of Canada
made it difficult to keep up with regular maintenance throughout much of the eastern portion of the Ruel Subdivision. The ATS was required to inspect and maintain about 62 miles of track between Gogama, Ontario (Mile 86.6), and Foleyet, Ontario (Mile 148.3). Due to the time required for the track maintenance work and the difficulties in obtaining track time, the ATS found it challenging to complete the required track inspections. Because this was the ATS’s first winter working in northern Ontario, the ATS had no frame of reference for the workload and the related challenges from previous years. Most of the track inspections were conducted by the ATS directly rather than the ATS delegating them to a qualified TF, because the TFs were more urgently required for completing track work and maintenance duties. In early 2015, during periods of severe cold, the ATS was sometimes required to perform track inspections every day of the week for extended periods. In addition to the cold weather track inspections, the ATS had to monitor a high number of rail defects and rail surface conditions. With the challenges in obtaining track time, a track inspection could take up to 16 hours to cover the 62 miles of track. The ATS also had difficulty getting repairs completed, as the need for maintenance crew overtime was not supported by the TSPVR. The ATS planned to have the REB condition within the insulated joint at Mile 111.7 temporarily repaired by welding, and to change out the insulated joint at a later date. At various times in December 2014 and January 2015, the ATS tried to schedule a weld repair at the insulated joint. However, attempts to have this work completed were unsuccessful, reportedly due to the welder not being available and the welder’s vehicle being unserviceable. The ATS attributed a large portion of the heavy workload to the fact that a large number of joints left in the track had not been welded the previous summer. The ATS had spoken to the incoming SME about the challenges on the Ruel Subdivision and was provided with additional personnel and support. While the ATS still had difficulty keeping up, there was general reluctance to place slow orders on the track that would affect train velocity. Senior management, meanwhile, viewed the absence of slow orders as a sign that staffing and maintenance was adequate. 1.19 Regulatory oversight TC promotes safe and secure transportation systems in the air, marine, rail, and road modes, as well as the safe transportation of DGs. To do so, TC develops safety regulations and standards, and in the case of railways, it facilitates the development of rules by the rail industry. Once the rules are approved, TC is then responsible for enforcing the rules through a number of inspection programs to monitor compliance with rules and regulations. Track inspections are targeted using a risk-based approach. TC also has a national inspection program that randomly selects track segments to be inspected every year. Primary traffic corridors usually receive more attention than secondary main lines. Rail safety is governed by the Railway Safety Act, the objectives of which are to:
Railway Investigation Report R15H0013 | 31
(a) promote and provide for the safety and security of the public and personnel, and the protection of property and the environment, in railway operations; (b) encourage the collaboration and participation of interested parties in improving railway safety and security; (c) recognize the responsibility of companies to demonstrate, by using safety management systems and other means at their disposal, that they continuously manage risks related to safety matters; and (d) facilitate a modern, flexible and efficient regulatory scheme that will ensure the continuing enhancement of railway safety and security.51 TC has also developed regulations on safety management systems (SMS), under which railways are responsible for managing their safety risks. Transport Canada regulatory track inspections 1.19.1 As part of TC’s oversight responsibilities, TC rail safety inspectors are tasked with conducting railway infrastructure inspections across Canada. Although railway subdivisions are not subject to regular TC inspections, TC uses a risk-based approach that considers various factors to identify areas of subdivisions requiring targeted inspection. While a significant increase in overall freight or DG traffic may be considered, it does not necessarily influence which subdivisions are scheduled for inspection. TC prioritizes inspections by considering different operational factors including but not limited to rail defects, geometry defects, passenger trains, high operating speeds, and tonnage. Table 5 provides a summary of track inspections conducted by TC on the Ruel Subdivision since 2005. Table 5. Track inspections conducted by Transport Canada on the Ruel Subdivision (2005 to 2015) Year From Mile To Mile 2005 148.3 223.5 2006 87 183 2007 0 86.7 2008 0 87 2010 87 127 2012 86 296
2013
2014
2015 (until February 2015) 51 Railway Safety Act (R.S.C. 1985, c. 42 (4th Supp.)), section 3.
32| Transportation Safety Board of Canada
TC had not performed any inspections on the Ruel Subdivision since 2012. Between 15 March 2015 and 19 March 2015, TC inspected the entire subdivision. The TC inspection noted a total of 67 non-compliant conditions that required repair and 59 other concerns and observations. 1.20 Railway Safety Management System Regulations An SMS is “a systematic, explicit and comprehensive process for managing safety risks.”52 It is a means to ensure that the railway has the processes in place to identify the hazards in its operation and mitigate the risks. SMS was designed around evolving concepts about safety that are believed to offer great potential for more effective risk management. SMS was progressively introduced in the Canadian transportation industry because this approach to regulatory oversight, which seeks to ensure that organizations have processes in place to manage risks systematically, when combined with inspections and enforcement, is considered to be more effective in reducing accident rates. Section 2 of the TC Safety Management System Regulations (2001) (the SMS Regulations), which were in force at the time of the accident, 53 states:
- A railway company shall implement and maintain a safety management
system that includes, at a minimum, the following components: (a) the railway company safety policy and annual safety performance targets and the associated safety initiatives to achieve the targets, approved by a senior company officer and communicated to employees; (b) clear authorities, responsibilities and accountabilities for safety at all levels in the railway company; (c) a system for involving employees and their representatives in the development and implementation of the railway company’s safety management system; (d) systems for identifying applicable
(i) railway safety regulations, rules, standards and orders, and the procedures for demonstrating compliance with them, and
(ii) exemptions and the procedures for demonstrating compliance with the terms or conditions specified in the notice of exemption; (e) a process for
(i) identifying safety issues and concerns, including those associated with human factors, third-parties and significant changes to railway operations, and
(ii) evaluating and classifying risks by means of a risk assessment;
52 Transport Canada, TP 15058E, Railway Safety Management Systems Guide: A Guide for Developing, Implementing and Enhancing Railway Safety Management Systems (November 2010), p. 3, available at http://publications.gc.ca/site/eng/9.694086/publication.html (last accessed 25 January 2017). 53 The Railway Safety Management System Regulations, 2015 came into force on 01 April 2015.
Railway Investigation Report R15H0013 | 33
(f) risk control strategies; (g) systems for accident and incident reporting, investigation, analysis and corrective action; (h) systems for ensuring that employees and any other persons to whom the railway company grants access to its property, have appropriate skills and training and adequate supervision to ensure that they comply with all safety requirements; (i) procedures for the collection and analysis of data for assessing the safety performance of the railway company; (j) procedures for periodic internal safety audits, reviews by management, monitoring and evaluations of the safety management system; (k) systems for monitoring management-approved corrective actions resulting from the systems and processes required under paragraphs (d) to (j); and (l) consolidated documentation describing the systems for each component of the safety management system. 54 The SMS Regulations also require railway companies to • maintain records to permit the assessment of safety performance (subsection 3(1)); • submit documentation and records to the Minister that demonstrate compliance with the regulations (subsection 4(1)); and • produce safety management documentation upon request (section 6). 1.21 Canadian National Railway Company’s safety management system In accordance with the SMS Regulations, CN had developed and implemented a detailed SMS. Since 2008, CN’s SMS had been enhanced each year and had been integrated into most facets of its operations. The SMS described company initiatives that correlate to the requirements of Section 2 of the SMS Regulations. With regard to paragraph 2(e) of the SMS Regulations that were in force at the time of the occurrence, CN had implemented systems for • identifying safety issues and concerns, including those associated with human factors, third-parties and significant changes to railway operations; • evaluating and classifying risks by means of a risk assessment; and • identifying and implementing risk control strategies. Specific actions included the following:
54 Transport Canada, Railway Safety Management System Regulations (SOR/2001-37), section 2, available at http://laws-lois.justice.gc.ca/eng/regulations/SOR-2001- 37/20060322/P1TT3xt3.html (last accessed 25 January 2017).
34| Transportation Safety Board of Canada
• Safety issues and concerns were flagged to CN management through hazard forms, health and safety committees, CN’s Ombudsman and CN’s Prevent Hotline (a joint venture with St. Mary’s University, Halifax, Nova Scotia), as well as through audits and trend analyses. • CN had a formal risk assessment process that was used to evaluate and classify risks, including those associated with significant changes in railway operations, such as the opening of new yards and facilities, railway acquisitions, introduction of new technology, significant changes in business (volumes or product), and changes in personal protective equipment. • Special corridor risk assessments were being carried out to assess and reduce risk in locations with high populations, waterways, or other environmental or topographical characteristics. • Training was being provided to employees who performed risk assessments. When human factors may have played a role in an accident, CN required further investigation before formulating corrective action, and the following was typically considered: • Was the work properly planned, organized and supervised? • Was the employee properly trained and equipped? • Did the employee have the opportunity for sufficient rest? • Was the rule or work procedure well understood?55,56 Despite having a formal risk assessment process, CN perceived the increased tonnage of crude oil shipments on the Ruel Subdivision during 2014 as a normal operating parameter. The increase in tonnage did not trigger CN to conduct a risk assessment or to review an existing one. 1.22 Safety culture Safety culture can be defined as “shared values (what is important) and beliefs (how things work) that interact with an organization’s structures and control systems to produce behavioural norms.”57 Safety culture is critical to effective safety management, because safety management processes will be ineffective in a culture that does not support the proactive sharing of safety information. Where a safety culture exists to support effective safety management, information pertaining to safety will be actively sought; employees will be trained to recognize hazards and rewarded for sharing safety concerns. In such a culture,
55 Canadian National Railway Company, “CN SMS & Safety Culture,” presentation to the Advisory Council on Railway Safety (17 February 2015). 56 Canadian National Railway Company, Leadership in Safety: Looking out for each other 2015: An Overview of CN’s Safety Management System (2015). 57 J. Reason, Managing the Risks of Organizational Accidents (Ashgate, 1997), p. 192.
Railway Investigation Report R15H0013 | 35
failures will be scrutinized as an opportunity to learn, and new ideas will be welcomed.58 An effective safety culture is critical to the processes required by an SMS that support the development of a resilient organization. TC’s SMS guidance document Rail Safety Management Systems Guide: A Guide for Developing, Implementing and Enhancing Railway Safety Management Systems states that An effective safety culture in a railway company can reduce public and employee fatalities and injuries, property damage resulting from railway accidents, and the impact of accidents on the environment. In simple terms, an organization’s safety culture is demonstrated by the way people do their jobs—their decisions, actions and behaviours define the culture of an organization. The safety culture of an organization is the result of individual and group values, attitudes, perceptions, competencies and patterns of behaviour that determine the commitment to, and the style and proficiency of, an organization’s health and safety management system. Organizations with a positive safety culture are characterized by communications from various stakeholders founded on mutual trust, by shared perceptions of the importance of safety and by confidence in the efficacy of preventive measures. 59 The relationship between safety culture and safety management is reflected in part by the beliefs, attitudes and behaviours of a company’s management. An effective safety culture includes proactive actions to identify and manage operational risk. It is characterized by an informed culture where people understand the hazards and risks involved in their own operation and work continuously to identify and overcome threats to safety. It is a just culture, where the workforce knows and agrees on what is acceptable and unacceptable. It is a reporting culture, where safety concerns are reported and analyzed and where appropriate action is taken. Finally, it is a learning culture, where safety is enhanced from lessons learned.60 A company’s policies determine how safety objectives will be met by clearly defining responsibilities; by developing processes, structures and objectives to incorporate safety into all aspects of the operation; and by developing the skills and knowledge of personnel. Procedures are directives for employees and communicate management’s instructions. Practices are what really happens on the job, which can differ from procedures and, in some cases, increase threats to safety.
58 Originally from Westrum (1992), described in Reason (1997), Managing the Risks of Organizational Accidents, Ashgate. 59 Transport Canada, TP 15058E, Rail Safety Management Systems Guide: A Guide for Developing, Implementing and Enhancing Railway Safety Management Systems (November 2010), section 5, available at http://publications.gc.ca/site/eng/9.694086/publication.html (last accessed 25 January 2017) [Italics in original] 60 Transport Canada, TP 13739, Introduction to Safety Management Systems (April 2001).
36| Transportation Safety Board of Canada
- 23 Safety culture at Canadian National Railway Company
In parallel with implementing SMS, CN had recognized the importance of building an effective safety culture which the company considers essential for SMS. To help strengthen its safety culture, CN has invested in training, coaching, and employee recognition and involvement. In October 2014, CN co-hosted a safety culture symposium in Halifax, Nova Scotia, during which participants discussed and shared information on safety culture. CN also hosted a number of safety summits throughout its regions to promote two-way communication and best safety practices. In 2014, among other initiatives, CN developed and implemented Looking Out for Each Other, a strategy that has become an integral part of CN‘s safety culture. The peer-to-peer engagement strategy was designed to • raise awareness among employees of the top causes of incidents and injuries; • identify and review safe work procedures; • train employees to be aware of their surroundings and to recognize potential at-risk work practices or situations in the field; • teach employees how to provide constructive feedback to peers; and • learn from past incidents to prevent a reoccurrence of the same event and help each other stay safe.61 1.24 Resilience: The safe operating envelope and requisite imagination Resilience is generally defined as the ability to “withstand or recover quickly from difficult conditions.”62 A resilient organization or system is defined as being “able to effectively adjust its functioning prior to, during or following changes and disturbances, so that it can continue to perform as required after a disruption or a major mishap, and in the presence of continuous stresses.”63 Four cornerstones common to resilient organizations have been identified. The ability to adjust and adapt requires the organization to respond to events, monitor key change indicators, anticipate long-term challenges, and learn from experience. With these cornerstones in place, a resilient organization will • know what to do (how to respond to regular events) • know what to look for (how to monitor for potential problems)
61 Canadian National Railway Company, Leadership in Safety: Looking out for each other 2015: An Overview of CN’s Safety Management System (2015). 62 “Resilience,” The Oxford English Dictionary, 10th ed. (New York: Oxford University Press, 2002). 63 E. Hollnagel, “The Four Cornerstones of Resilience Engineering,” in: C.P. Nemeth, E. Hollnagel and S. Dekker (eds.), Resilience Engineering Perspectives, Volume 2: Preparation and Restoration (CRC Press, 2009), p. 117.
Railway Investigation Report R15H0013 | 37
• know what to expect (anticipating potential threats) • know what has happened (having the right indicators to learn from experience). 64 These abilities help organizations balance potentially competing safety, efficiency, and workload pressures relevant to the operating environment. An organization that is effectively monitoring, anticipating, and learning through proactive safety management processes and leading safety indicators will be able to respond to competing pressures and maintain an acceptable level of risk. Being poorly equipped to detect and understand the significance of small changes in the operating environment will increase risk until lagging indicators, such as accidents or serious incidents, provide clear indications that the system is out of balance. One of the challenges is that safety reserves, procedures and practices that help maintain an acceptable margin of safety, can experience pressure from competing demands to increase efficiency. Mistaking safety reserves for inefficiencies will undermine safety goals.65 Balancing competing demands is a challenge for individuals at all levels of an organization, because safety issues can emerge slowly and be difficult to detect. The human capability to appreciate the significance of information and events and to anticipate their impact on safety has been termed “requisite imagination.” Developing requisite imagination relies on individuals within the organization having • expert track knowledge allowing anticipation and judgement of defect conditions; • the will to think critically about the functioning of the system; • effective training to develop these capabilities; • sufficient spare capacity to respond to events; and • a clear flow of information throughout the organization.66 A comprehensive SMS would help an organization develop requisite imagination by ensuring that it has processes in place to support the 4 cornerstones of resilience, including • effective procedures for normal and abnormal situations (responding) • safety reporting and trend analysis (monitoring) • risk identification and assessment (anticipating) • incident investigation (learning).
64 Ibid., p. 120. 65 D. Woods, J. Schenk and T.T. Allen, “An Initial Comparison of Selected Models of System Resilience,” in: C.P. Nemeth, E. Hollnagel and S. Dekker (eds.), Resilience Engineering Perspectives, Volume 2: Preparation and Restoration (CRC Press, 2009), p. 82. 66 R. Westrum, “Ready for Trouble: Two Faces of Resilience,” in: C.P. Nemeth, E. Hollnagel and S. Dekker (eds.), Resilience Engineering Perspectives, Volume 2: Preparation and Restoration (CRC Press, 2009) pp. 135–148.
38| Transportation Safety Board of Canada
“Proactive safety management helps organizations look ahead to notice the signs that risks are changing or increasing despite past records of success and increasing pressures for short term performance.”67 An effective safety culture is essential in order to realize the benefits of requisite imagination. The safety culture of an organization will largely determine the type and amount of information fed into safety management processes, and how such information will be received and addressed. 1.25 Significant accidents involving Class 111 tank car releases There have been a number of occurrences in Canada and the U.S. during which product was released from Class 111 tank cars following a collision, impact or fire (Appendix C). These occurrences highlight the vulnerability of Class 111 tank cars to accident damage and product release. As of June 2015, about 270 000 Class 111 tank cars were in service in North America, of which about 141 000 were being used to transport DGs. 1.26 The Lac-Mégantic accident On 05 July 2013, at about 2250 Eastern Daylight Time, Montreal, Maine & Atlantic Railway (MMA) freight train MMA-002, en route from Montréal, Quebec, to Saint John, New Brunswick, was stopped at Nantes (Mile 7.40 of the Sherbrooke Subdivision), Quebec, the designated MMA crew-change point. The train, consisting of 5 head-end locomotives,1 VB car (i.e., special-purpose caboose), 1 box car, and 72 Class 111 tank cars carrying flammable liquids (petroleum crude oil, UN 1267, Class 3), was then secured on the main track and left unattended on a descending grade. Shortly before 0100 on 06 July 2013, the unattended train started to move, and gathered speed as it rolled, uncontrolled, down the descending grade toward the town of Lac- Mégantic, Quebec. After reaching a speed of 65 mph, 63 Class 111 tank cars and a box car derailed near the centre of the town. The derailed cars released approximately 5.98 million litres of product due to tank car damage. The released product ignited almost immediately, resulting in a large pool fire that burned for more than a day. Forty-seven people were fatally injured. Many buildings, vehicles, and the railway tracks were destroyed. About 2000 people were initially evacuated from the surrounding area.
67 D. Woods, J. Schenk and T.T. Allen, “An Initial Comparison of Selected Models of System Resilience,” in: C.P. Nemeth, E. Hollnagel and S. Dekker (eds.), Resilience Engineering Perspectives, Volume 2: Preparation and Restoration (CRC Press, 2009), p. 92.
Railway Investigation Report R15H0013 | 39
As part of the Lac-Mégantic investigation,68 the TSB highlighted the vulnerabilities of Class 111 tank cars and recommended that: The Department of Transport and the Pipeline and Hazardous Materials Safety Administration require that all Class 111 tank cars used to transport flammable liquids meet enhanced protection standards that significantly reduce the risk of product loss when these cars are involved in accidents. TSB Recommendation R14-01, issued January 2014 1.27 Response from Transport Canada to TSB Recommendation R14-01 (January 2016) On 23 April 2014, TC announced a 3-year phase-out of older, less crash-resistant Class 111 tank cars. On 02 July 2014, the TP 14877 standard was adopted by reference in the Transportation of Dangerous Goods Regulations, aligning Canadian regulations with the 2011 AAR CPC-1232 standard. In May 2015, TC published in the Canada Gazette, Part II, the Regulations Amending the Transportation of Dangerous Goods Regulations (TC 117 Tank Cars). These regulations established the requirements for a new flammable liquid tank car standard (TC-117), as well as retrofit requirements for older DOT-111 and CPC-1232 tank cars in flammable liquid service. They also established implementation timelines to modernize the Canadian tank car fleet. The standards and timelines were generally harmonized with the U.S. regulators, Pipeline and Hazardous Materials Safety Administration, the Federal Railroad Administration and the Department of Transportation. With the coming into force of its recent Fixing America's Surface Transportation (FAST) Act, the U.S. has further harmonized with the Canadian requirements. The Canadian regulations require that all new tank cars built for the transport of flammable liquids be constructed using thicker and more impact-resistant steel, and be equipped with jacketed thermal protection, full-height head shields, top fittings protection, improved bottom outlet valves, and appropriate pressure relief devices. TC continues to work with the Canadian railway industry to consider braking provisions, such as electronically controlled pneumatic (ECP) brakes, in train operating rules rather than considering such braking provisions within the requirements of the TC-117 tank car standard. TC is also closely following the new requirements brought forward by the U.S. FAST Act, which imposed new research requirements before ECP braking can be brought into effect in the U.S. With the ongoing low world demand for crude oil, and its associated low world price, the transport of crude oil by rail has slowed, and consequently, so has tank car demand. Shippers and builders have used this low-demand cycle to better assess fleet usage, tank car demand, and retrofit requirements. With the coming into force of the U.S. FAST Act, which
68 TSB Railway Investigation Report R13D0054.
40| Transportation Safety Board of Canada
brings U.S. requirements further in line with Canadian requirements, industry has begun to ramp up the retrofitting of DOT-111 tank cars in flammable liquid service. On 24 July 2016, TC issued Protective Direction No. 38, which moved ahead the date of compliance for limiting the use of legacy DOT-111 tank cars as outlined in Regulations Amending the Transportation of Dangerous Goods Regulations (TC 117 Tank Cars). The date that both unjacketed and jacketed legacy DOT-111 tank cars will be phased out was moved ahead to 01 November 2016 from 01 May 2017 and 01 March 2018 respectively. Protective Direction No. 38 applies only to crude oil defined within the protective direction as: • Petroleum crude oil (UN 1267) • Petroleum distillates N.O.S., or Petroleum products N.O.S. that is crude oil (UN 1268) • Petroleum sour crude oil, flammable, toxic (UN 3494) 1.28 Board assessment of Transport Canada’s response to TSB Recommendation R14-01 (March 2016) In March 2016, the Board assessed TC’s response to Recommendation R14-01. The Board acknowledged TC’s commitment and progress made on the publication of the new tank car standards and the updating of TP 14877. The Board noted the progress made on the construction of new TC-117 tank cars and the retrofitting of older flammable liquid tank cars. Given TC’s progress made on this issue, its ongoing monitoring, and its intention to fully enforce the phase-out retrofit timelines, the Board reassessed the response to Recommendation R14-01 as having Satisfactory Intent. However, until all flammable liquids are transported in tank cars built sufficiently robust to prevent catastrophic failure when involved in an accident, the risk will remain high. Therefore, the Board called upon TC to ensure that risk control measures during the transition are managed effectively. 1.29 Association of American Railroads Circular OT-55-N and TSB Recommendation R14-02 In January 1990, based on recommendations of the Inter-Industry Task Force on the Safe Transportation of Hazardous Materials by Rail, the AAR issued Circular OT-55 (OT-55), entitled Recommended Railroad Operating Practices for Transportation of Hazardous Materials. OT-55 provided the rail industry with routing guidance for selected DGs, including poisonous-by-inhalation (PIH) and toxic-by-inhalation (TIH) products. Radioactive materials were added to OT-55 in August 2001. In addition, OT-55 identified the technical and handling requirements for key trains and key routes. Following the Lac-Mégantic accident, the definition of a key train was revised69 within OT-55-N to include any train containing 1 or more cars of PIH or TIH material, such as
69 Association of American Railroads (AAR), Circular No. OT-55-N (CPC-1258) (effective 05 August 2013).
Railway Investigation Report R15H0013 | 41
anhydrous ammonia, ammonia solutions, spent nuclear fuel or high-level radioactive waste, or containing 20 carloads or intermodal tank loads of any combination of other HAZMAT. Although OT-55-N was not applicable in Canada, CN extended these measures to its Canadian operations, in August 2013. As part of a company initiative, CN conducted risk assessments for subdivisions within corridors identified as key routes. As part of the investigation into the Lac-Mégantic accident, the TSB indicated that a similar approach based on OT-55-N, strengthened with a requirement to conduct route planning and analysis, would be a positive step to improve the safety of transporting DG by rail for all railways in Canada. On 23 January 2014, the Board recommended that: The Department of Transport set stringent criteria for the operation of trains carrying dangerous goods, and require railway companies to conduct route planning and analysis as well as perform periodic risk assessments to ensure that risk control measures work. TSB Recommendation R14-02, issued January 2014 1.30 Response from Transport Canada to TSB Recommendation R14-02 (January 2016) On 23 April 2014, TC issued Ministerial Order (MO) 14-01 requiring all railway companies and local railway companies to formulate and revise rules respecting the transportation of DGs. The rules were to be filed with the Minister of Transport no later than 23 October 2014. At the same time, TC issued an Emergency Directive requiring railways carrying DGs to implement minimum operating practices for key trains to address the Board’s recommendation, and to manage the immediate safety issue by, among other things, implementing speed restrictions for trains carrying DGs, expanding the inspection requirements on restricted rail routes, and completing risk assessments for key routes. The emergency directive was put in place for 6 months, and was renewed every 6 months to allow further consultation with stakeholders, which included unions and the Federation of Canadian Municipalities, and to reflect consideration of any additional U.S. requirements that may be established. With respect to the 10 000-carload threshold, it was adopted based on the criteria outlined in the AAR Circular OT-55-N, which was also adopted by U.S. railways. TC recognizes that further analysis must be performed to determine a carload threshold that would optimize the safe transportation of DGs, which may lead to more stringent criteria for key routes. TC has contracted a third-party expert to conduct the necessary analysis to determine the appropriate threshold criteria. The project, which is led by TC’s Transportation Development Centre, will determine the appropriate threshold criteria for key routes. The Transportation Development Centre completed the project in December 2016, and TC is currently reviewing the results. TC is also considering whether to expand the current criteria that define key trains by introducing requirements for technology that could enhance braking capability. Moreover,
42| Transportation Safety Board of Canada
through the Risk-Based Planning process, TC will review all federally regulated railways to identify those that transport crude oil, but did not meet the 10 000-tank car threshold on their routes. Through this risk-based approach, TC has assigned appropriate resources to further monitor these railway operators. The Railway Safety Management System Regulations, 2015, published in the Canada Gazette, Part II, on 25 February 2015 and in force on 01 April 2015, contain requirements for a risk assessment process. Under Section 15 of the regulations, a railway company must conduct a risk assessment when it proposes to begin transporting DGs, or to begin transporting DGs different from those it already transports, or when there is a proposed change to its railway operations. Changes in railway operations include a change that may affect the safety of the public or personnel, or the protection of property or the environment, such as an increase in the volume of DGs it transports and a change to the route on which DGs are transported. 1.31 Board assessment of Transport Canada’s response to TSB Recommendation R14-02 (March 2016) In March 2016, the Board assessed TC’s response to Recommendation R14-02. The Board noted that TC has made progress on this issue, including more stringent risk assessment criteria for railways handling DGs, the ongoing analysis to determine the appropriate threshold criteria on key routes, and the recent promulgation of Rules Respecting Key Trains and Key Routes. Given this progress, the Board considers the risks associated with a catastrophic DG release or explosion to have been reduced. While some progress has been made on the railways that have identified key routes, analysis of the appropriate threshold criteria for key routes must still be performed. Therefore, the Board reassessed the response to Recommendation R14-02 as having Satisfactory Intent. 1.32 Rules Respecting Key Trains and Key Routes In response to TSB Recommendation R14-02, in April 2014, TC issued MO 14-01, which defined criteria used for identifying key trains and key routes. MO 14-01 required railways to • formulate rules respecting the safe and secure operations of trains carrying certain dangerous goods and flammable liquids • govern the route and speed of any Key Train to 50 mph or lower, including but not limited to a further speed restriction to 40 mph or lower for any Key Train transporting one or more Class 111 loaded tank cars containing a number of selected DGs, which included petroleum crude oil and petroleum distillates, in areas identified as higher risk through a risk assessment process
Railway Investigation Report R15H0013 | 43
• conduct risk assessments and periodic updates based on significant change to determine the level of risk associated with each Key Route over which a Key Train is operated.70 The MO was re-issued a number of times to provide time for consultation and the development of industry rules. Once the rules were finalized, the MO was lifted. The Rules Respecting Key Trains and Key Routes were approved by TC, and came into effect in February 2016. Subsections 4.1 and 4.2 of the rules read as follows: 4.1 Companies must restrict Key Trains to a maximum speed of 50 miles per hour (MPH). Companies must further restrict Key Trains to a maximum speed of 40 MPH within the core and secondary core of Census Metropolitan Areas (CMA).[ 71] 4.2 Companies must restrict Key Trains transporting one or more DOT-111 loaded tank cars containing UN1170 ETHANOL, UN1202 DIESEL FUEL, UN1203 GASOLINE, UN1267 PETROLEUM CRUDE OIL, UN1268 PETROLEUM DISTILLATES, N.O.S., UN1863 FUEL, AVIATION, TURBINE ENGINE, UN1993 FLAMMABLE LIQUID, N.O.S., UN3295 HYDROCARBONS, LIQUID, N.O.S., UN1987 ALCOHOLS N.O.S., UN3494 PETROLEUM SOUR CRUDE OIL, FLAMMABLE, TOXIC or UN3475 ETHANOL AND GASOLINE MIXTURE to a maximum speed of 40 MPH in areas identified as higher risk through the risk assessment process as required under item 6 of this Rule. The DOT-111 tank cars include those that are CPC-1232 specification.[72] With respect to the speed restriction of 40 mph for a unit train hauling Class 3 flammable liquids, no detailed engineering analysis had been performed to assess the effect of the speed reduction on the severity of a derailment. 1.33 Canadian National Railway Company corridor risk assessment On 23 June 2014, in compliance with MO 14-01, CN submitted a risk assessment to TC for the transport of DGs on the Winnipeg–Toronto key route. The risk assessment evaluated each subdivision on the territory to assess areas of vulnerability in terms of • the measures in place to prevent an occurrence (i.e., coverage of wayside inspection systems);
70 Transport Canada, MO 14-01, Minister of Transport Order Pursuant to Section 19 of the Railway Safety Act, available at http://www.tc.gc.ca/eng/mediaroom/ministerial-order-railway- 7491.html (last accessed 25 January 2017) 71 A Census Metropolitan Area (CMA), as defined by Statistics Canada, is an area of one or more neighbouring municipalities situated around a core. A CMA must have a total population of at least 100 000, of which 50 000 or more live in the core. A census agglomeration [secondary core] must have a population of at least 10 000. 72 Transport Canada, Rules Respecting Key Trains and Key Routes (12 February 2016), subsections 4.1 and 4.2.
44| Transportation Safety Board of Canada
• the potential consequences associated with an occurrence (i.e. proximity to population centres and environmentally sensitive areas); and • the ability to respond to an occurrence (i.e., locations of personnel and materials to respond to a spill). With respect to the Ruel Subdivision, most of the required mitigations identified by the corridor risk assessment were related to the ability to respond to an emergency involving DGs, such as the need for caches of response equipment on the territory, and the need to evaluate contractor coverage for emergency response. Similarly, the risk assessment factored key trains that haul Class 2.3 DGs (toxic gases) into the assessment as well as train movements where 20 or more loaded tank cars or loaded intermodal tanks containing DGs are shipped. The corridor risk assessment did not factor current or projected future track conditions into the risk assessment process. Furthermore, it did not anticipate the increase in the transport of crude oil or the impact of the increased tonnage on the ability to maintain adequate infrastructure safety margins. 1.34 Factors affecting the severity of derailment of tank cars carrying hazardous materials A 1992 study entitled Hazardous Materials Car Placement in a Train Consist reviewed a number of National Transportation Safety Board (NTSB) derailment investigations and Federal Railroad Administration train accident data. At the time of the study, unit trains of Class 3 flammable liquid DGs were virtually non-existent, and Class 111 tank cars were limited to a gross rail load (GRL) capacity of 263 000 pounds. No unit DG trains were included in the study. The study concluded (in part) that
- Railroad accident data confirms that, on the average, more cars are
derailed in longer trains. To enhance hazmat transportation safety, hazmat cars should therefore be handled in somewhat shorter trains, even though it is recognized that this will result in more trains and possibly increased exposure. Exposure is, of course, route dependent and must be assessed accordingly.
- Railroad accident data also confirm that, on the average, more cars are
derailed in trains at higher speeds. Hazmat cars should therefore be handled at somewhat more restricted speeds. Modest speed reductions may not necessarily result in increased exposure. This is again route dependent.73 While not referenced specifically in the study, the weight of the cars involved in any derailment would also contribute to the severity of the accident.
73 R.E. Thompson, E. R. Zarnejc and D.R. Ahlbeck, DOT/FRA/ORD-92118.1, Hazardous Materials Car Placement In A Train Consist, Volume I: Review and Analysis (Washington, DC: United States Department of Transportation, June 1992), section 6.2: Conclusions/Recommendations, p. 144.
Railway Investigation Report R15H0013 | 45
Other more recent studies, summarized in 2014, 74 have shown that the number of cars derailed is influenced by accident cause, train speed, train length, and point of derailment within a train. Specifically, broken rails result in more cars derailing than any other accident cause; higher-speed derailments result in more cars derailed; longer trains have more cars derail; and the closer a derailment occurs to the front of a train, the more cars derail. 1.35 TSB Laboratory examination of the failed insulated joint The failed insulated joint was sent to the TSB Laboratory for detailed examination. It was determined that: • The running surface of the parent rail showed REB with an average depth of 2.4 mm, with the deepest region approximately 4.4 mm below the running surface of the rail (Figure 4). • Visual examination of the fractures showed fatigue cracking initiating at the upper fishing surface (the mating surface between the top of the joint bars and the underside of the rail head) on the top of both joint bars. • Fatigue cracking propagated vertically downward for approximately 20% of the joint bar cross-sectional area before transitioning to overstress rupture (Figure 5). • Corrosion pits were also observed on the fishing surfaces along the top edge of the joint bars adjacent to the fracture initiation sites. • The fatigue fracture origins coincided with corrosion pitting observed on the outer surfaces.
74 Xiang Liu, Mohd Rapik Saat and Christopher P.L. Barkan, “Probability analysis of multiple-tank- car release in railway hazardous materials transportation,” Journal of Hazardous Materials, Volume 276 (15 July 2014), pp. 442–451.
46| Transportation Safety Board of Canada
Figure 4. Gauge-side view of west portion of the insulated joint (Note: The arrows indicate the rail end batter on the running surface and the secondary cracking.)
Figure 5. End view of broken joint showing field- and gauge-side joint bars with fatigue (F) and overstress (OS) zones
Railway Investigation Report R15H0013 | 47
• Little if any of the insulating glue remained between the top of the joint bars and the underside of the rail head. • Secondary cracks were observed at the bottom of each joint bar below the bolt hole closest to the fracture, and on the gauge-side joint bar at the outboard lower corner of the bar. The secondary cracks displayed fatigue cracking. • The rail head had also showed crushing, primarily to the field side, for approximately 200 mm from the rail end. • The joint bar material met the specified strength requirements. 1.36 TSB testing of crude oil samples Table 6 provides a summary of the shipping information on the transportation of DGs pertinent to the tank cars in the occurrence train. Table 6. Tank car lading information Tank car location in train Shipping description under the Transportation of Dangerous Goods Act Information on safety data sheet Product identification number Proper shipping name Hazard class Packing group Product name Synonyms Manufacturer 1 to 58 71 to 80 UN1267 Petroleum Crude Oil 3 I Horizon Sweet Light Oil Synthetic crude oil distillate; Sweet light oil Canadian Natural Resources Ltd., Calgary AB 59 to 70 81 to 100 UN1268 Petroleum Distillates N.O.S. (Syncrude SYN) 3 I Synthetic Crude Oil Syncrude Sweet Premium; SSB; SSP; SYN; Syncrude sample tag #200000 Canadian Oil Sands Partnership #1, Calgary AB Product samples (Photo 3) were taken from 3 representative non-derailed tank cars.
48| Transportation Safety Board of Canada
Photo 3. Oil samples taken from tank cars VMSX 310351, VMSX 310187, and VMSX 310192 The samples were collected on 23 February 2015 at the Valero refinery in Lévis, Quebec, under the direction of a TSB investigator. Prior to the collection of samples, the respective tank car hatches were opened and a gas test was performed in the work environment around the hatch of each car using a portable multi-gas detector, able to detect 6 gases. The test results indicated that the work environment was adequate to work in without respiratory protection. All crude oil samples were collected at atmospheric pressure. The samples were tested for characteristics relevant to the classification of the petroleum crude oil and to its behaviour and effects during the post-accident spill and fire. The product samples were split and sent to 2 accredited external laboratories for testing. Table 7 lists the tests performed on each sample.
Railway Investigation Report R15H0013 | 49
Table 7. Tests performed on crude oil samples Parameter Test method Flash point temperature ASTM D3828-12a Standard Test Methods for Flash Point by Small Scale Closed Cup Tester - Method B Boiling point distribution ASTM D2887-14 Standard Test Method for Boiling Range Distribution of Petroleum Fractions by Gas Chromatography ASTM D86-12 Standard Test Method for Distillation of Petroleum Products at Atmospheric Pressure Density ASTM D5002-13 Standard Test Method for Density and Relative Density of Crude Oils by Digital Density Analyzer Reid vapour pressure ASTM D323-15a Standard Test Method for Vapor Pressure of Petroleum Products (Reid Method) Sulphur content ASTM D4294-10 Standard Test Method for Sulfur in Petroleum and Petroleum Products by Energy Dispersive X-ray Fluorescence Spectrometry Viscosity ASTM D7042-14 Standard Test Method for Dynamic Viscosity and Density of Liquids by Stabinger Viscometer (and the Calculation of Kinematic Viscosity) The material safety data sheet (MSDS) for synthetic crude oil describes this product as a low sulphur blend of treated naphtha (16% to 20%), light gas oil (34% to 48%) and heavy gas oil (30% to 45%) petroleum fractions derived from bitumen, with a boiling range of −20 °C to 560 °C and a flash point of less than 20 °C. The MSDS for Horizon sweet light crude oil described the product as a complex mixture of hydrocarbons derived from primary distillation of petroleum crude oil with an initial boiling point of less than 35 °C and flash point of less than −20 °C. The test results obtained for the occurrence products were compared with published values for various other petroleum products (Table 8). These published values were taken from the 2014 Crude Characteristics Booklet,75 which contained a summary of selected properties of petroleum products moved in the Enbridge Pipelines/Enbridge Energy Partners system. Representative test results for the Bakken crude oil involved in the Lac-Mégantic derailment (TSB Investigation Report R13D0054) were also included for comparison purposes.
75 Enbridge, 2014 Crude Characteristics Booklet, available at http://www.enbridge.com/~/media/www/Site%20Documents/Delivering%20Energy/2014%2 0Mainline%20Crude%20Characteristics.pdf?la=en (last accessed 25 January 2017).
50| Transportation Safety Board of Canada
Table 8. Comparison of occurrence product sample test results and published oil properties Source Product identifier Total sulphur (mass %) Reid vapour pressure (kPa) Density (kg/m3) Viscosity (cSt) at temperature 20 °C 30 °C 40 °C Occurrence test results* Horizon Sweet Light Oil (VMSX 310192) 0.081 24.2 846.9 3.616 2.968 2.419 Synthetic Crude Oil (VMSX 310351) 0.157 31.6 867.3 7.899 5.914 4.544 2014 Crude Characteristics Booklet CNS** 0.03 31.4 841.5 3.39 2.73 2.26 SP*** 0.17 28.6 860.4 8.34 6.12 4.69 WCB (Western Canada Blend)**** 3.03 32.1 927.5 155 88.3 54.8 Lac-Mégantic (R13D0054) test results***** PROX44211-C- TOP 0.117 62.3 821.9 3.259 2.665 2.230 * For simplicity, only sample VMSX 310192 is shown in Table 8 because sample VMSX 310187 gave similar results. ** CNS is the product identifier for light sweet synthetic Crude oil produced from the Canadian Natural Resources Ltd. Horizon Project.
SP is the product identifier for Syncrude Sweet Premium produced from the Syncrude Canada Project.
The National Energy Board Act Part IV (Oil and Gas) Regulations define “heavy crude oil” as oil that has a density greater than 875.7 kg/m3.
TSB Engineering Report LP148/2013 Analysis of Crude Oil Samples. The product testing and comparisons revealed the following: • Despite the minor differences in test results, it was considered that the products had similar chemical and physical properties. • The test results were consistent with the product information provided in the MSDS and industry-published values for each type of products. • The products were appropriately classified. • As was expected, the density and viscosity of the products were significantly lower than those of heavy crude oils, such as the WCB product. • The products exhibited somewhat lower vapour pressure than but similar density, viscosity and volatility to that of the Bakken Shale crude oil involved in the Lac- Mégantic occurrence. • The large quantities of spilled product, the rapid rate of release of the product, and the high volatility and low viscosity of both products were major contributors to the large post-derailment pool fires.
Railway Investigation Report R15H0013 | 51
- 37 Tank car information
Historically, most legacy Class 111 tank cars were built with a GRL capacity of 263 000 pounds. In the mid-1990s, the industry began moving towards a Class 111 tank car with a GRL capacity of 286 000 pounds. In the late 1990s, TC, the DOT, and the AAR established a number of requirements for tank car GRL to be increased to 286 000 pounds. The requirements included increased puncture resistance for the tank heads and shells, increased design loads, and enhanced protection of service equipment. These requirements were further incorporated into TC and AAR standards for tank cars with a GRL of 286 000 pounds. However, these requirements did not apply to the majority of Class 111 tank cars at the time, which had a GRL of 263 000 pounds. The next step was to address the cars with a GRL of 263 000 pounds. In 2011, the AAR CPC-1232 tank car standards were established. These standards incorporated a number of enhancements to all Class 111 tank cars built after 01 October 2011 for the transportation of petroleum crude oil and ethanol (Class 3 PG I or PG II). These enhancements included the construction of tank cars to 286 000 pound standards, protection of the service equipment on the top shell, the use of reclosing pressure relief devices (PRD), the use of normalized steel for tank shells and tank heads, an increased minimum thickness for all tank cars that were not jacketed and insulated, and at least ½ inch thick half-head shields. For Canada, the specifications applicable to tank cars built before December 2013 were listed in TC safety standard CAN/CGSB-43.147.76 For tank cars built after December 2013, TC TDG tank specification TP14877 applied.77 Other applicable specifications were the Code of Federal Regulations Title 49 (49 CFR), paragraph 179.20078 for the U.S., and the industry Casualty Prevention Circular No. CPC-1232 (CPC-1232) standard.79 TC later incorporated these requirements into the Regulations Amending the Transportation of Dangerous Goods Regulations (TC-117 Tank Cars) which allowed Class 111 tank cars constructed to CPC-1232 requirements to be used in the interim to transport flammable liquids until the TC-117 tank car became mandatory.
76 Section 5.14 of the Transportation of Dangerous Goods Regulations specifies that a means of containment manufactured, selected, and used in accordance with safety standard CAN/CGSB- 43.147, last amended July 2008, is a permitted means of containment for the transportation of Class 3, 4, 5, 6.1, 8, or 9 dangerous goods by rail or by ship. 77 Transport Canada, TP 14877, Containers for the Transport of Dangerous Goods by Rail (December 2013). 78 United States Code of Federal Regulations, Title 49, Part 179: Specifications for Tank Cars. 79 American Association of Railroads (AAR), Manual of Standards and Recommended Practices, Section C-III: Specifications for Tank Cars, M-1002 (10/2007), Chapter 2.7: Requirements for Cars Built for the Transportation of Packing Group I and II Materials with the Proper Shipping Name “Petroleum Crude Oil”, “Alcohols, n.o.s.”, and “Ethanol and Gasoline Mixture” (implemented September 2011).
52| Transportation Safety Board of Canada
Following the Lac-Mégantic derailment (TSB Railway Investigation Report R13D0054), the rail industry believed that Class 111 tank cars constructed to the CPC-1232 standard would provide enhanced protection for Class 3 products compared to legacy Class 111 tank cars.80 Current crude oil unit train tank cars are usually all loaded to 286 000 pounds. In comparison, mixed merchandise and intermodal trains generally transport freight cars that have a lower GRL capacity. In 2014, the average crude oil unit train measured approximately 6000 feet in length and weighed about 13 000 tons, which is considered a very heavy train relative to its length. In comparison, a 13 000 ton mixed merchandise or intermodal train would typically range from about 9000 feet to 12 000 feet in length. Figure 6 identifies the primary components on a Class 111 tank car. Figure 6. General service Class 111 (CPC-1232) tank car arrangement. The pressure relief device for all tank cars involved in this occurrence was located inside the top fitting housing.
All 100 tank cars in the occurrence train were constructed for and owned by Valero, which was also the product shipper and consignee. The tank cars were loaded at the Pembina Redwater terminal facility in Redwater, Alberta, and were carrying product destined for Valero’s refinery in Lévis, Quebec. All of the derailed tank cars were built within 3 years prior to the accident by Trinity Tank Car Inc., manufactured to U.S. DOT specification 111A100W1, and compliant with the industry’s CPC-1232 standard.
80 A Railway Supply Institute—Association of American Railroads Tank Car Safety Research and Test Project database suggests that CPC-1232 tank cars perform 25% to 50% better than DOT-111s with respect to conditional probability of release.
Railway Investigation Report R15H0013 | 53
The tank car heads and shells were made of AAR TC-128 Grade B normalized steel.81 All head shields were constructed of ½-inch thick ASTM A572 Grade 50 steel plate. The 15th (VMSX 5112) and the 18th (VMSX 280529) cars were equipped with full-height head shields, jackets and insulation. The remaining tank cars were non-jacketed and non-insulated, and equipped with trapezoidal half-head shields. All of the tank cars had type TRN 024 stub sills, except for the 15th tank car, which had a type TRN 023 stub sill. The tank cars were equipped with a 4-inch bottom outlet valve (BOV), top fittings (vacuum relief, 2-inch, and 3-inch ball valves) within a protective 20-inch multi-housing assembly, a hinged and bolted manway and a PRD. The PRD was fitted within the multi-housing assembly. Table 9 summarizes some of the pertinent construction details for the 29 derailed tank cars.
81 Normalization is a type of process used to improve ductility and toughness properties where the steel is heated slightly above its upper critical temperature and then is air cooled. This results in a more uniform, fine grained ferrite-pearlite structure.
54| Transportation Safety Board of Canada
Table 9. Information about the construction of the derailed tank cars Car location in train from head- end* Tank car number Date certificate of construction approved Head/shell thickness (inch) Head shield Jacket – insulation Pressure relief device Start-to- discharge pressure (psig) Actual flow capacity** (scfm)*** 7 VMSX 310740 Jul 2014 1/2 Half shield None 75 27 000 8 VMSX 311903 Feb 2013 1/2 Half shield None 75 27 000 9 VMSX 310400 Jul 2014 1/2 Half shield None 75 27 000 10 VMSX 311809 Jul 2014 1/2 Half shield None 75 27 000 11 VMSX 310404 Jul 2014 1/2 Half shield None 75 27 000 12 VMSX 310872 Jul 2014 1/2 Half shield None 75 27 000 13 VMSX 311626 Jul 2014 1/2 Half shield None 75 27 000 14 VMSX 310095 Feb 2013 1/2 Half shield None 165 35 608 15 VMSX 5112 Aug 2013 7/16 Full shield Steel – 4-inch glass wool 165 2329 16 VMSX 310838 Jul 2014 1/2 Half shield None 75 27 000 17 VMSX 311634 Jul 2014 1/2 Half shield None 75 27 000 18 VMSX 280529 Sep 2014 7/16 Full shield Steel – 4-inch glass wool 165 2 329 19 VMSX 310274 Jul 2014 1/2 Half shield None 75 27 000 20 VMSX 311644 Jul 2014 1/2 Half shield None 75 27 000 21 VMSX 311725 Jul 2014 1/2 Half shield None 75 27 000 22 VMSX 311643 Jul 2014 1/2 Half shield None 75 27 000 23 VMSX 310432 Jul 2014 1/2 Half shield None 75 27 000 24 VMSX 310438 Jul 2014 1/2 Half shield None 75 27 000 25 VMSX 310486 Jul 2014 1/2 Half shield None 75 27 000 26 VMSX 311851 Jul 2014 1/2 Half shield None 75 27 000 27 VMSX 311824 Jul 2014 1/2 Half shield None 75 27 000 28 VMSX 310054 Feb 2013 1/2 Half shield None 165 35 608 29 VMSX 311892 Jul 2014 1/2 Half shield None 75 27 000 30 VMSX 310173 Feb 2013 1/2 Half shield None 165 35 608 31 VMSX 311629 Jul 2014 1/2 Half shield None 75 27 000 32 VMSX 310767 Jul 2014 1/2 Half shield None 75 27 000 33 VMSX 310091 Feb 2013 1/2 Half shield None 165 35 608 34 VMSX 311962 Feb 2013 1/2 Half shield None 75 27 000 35 VMSX 311906 Feb 2013 1/2 Half shield None 75 27 000 * Throughout the report, tank cars are identified by their position in consist number. ** Note that the required flow capacity differs for non-insulated, insulated, or thermally protected tank cars. *** Standard cubic feet per minute.
Railway Investigation Report R15H0013 | 55
- 38 Site examination of derailed tank cars
Aerial photo-documentation of the derailment zone was performed before the post- derailment fire had been extinguished. Consequently, some of the derailment zone was obscured by smoke, which increased the difficulty of documenting the site through aerial photographs. However, TSB investigators were able to examine the site and photograph most of the tank cars in situ while emergency responders dealt with the fire. Once the fire was extinguished, the remaining product was removed from the tank cars. The tank cars were then moved to a staging area for cleaning and purging, in preparation for site examination. Tank car examination was conducted by CN, the TSB, and representatives of the tank car manufacturer. All of the derailed tank cars were in compliance with specification requirement CPC-1232 that was in effect at the time of their approval and construction. During the site examination, test coupons of tank car material were collected from selected tank cars for metallurgical examination. The test coupons were sent to the TSB Laboratory for detailed examination. Tank car breaches 1.38.1 Table 10 provides a summary of the types of breaches observed on each derailed tank car.
56| Transportation Safety Board of Canada
Table 10. Breaches observed on each tank car Car location in train from head-end Tank car number Type of breach Head Shell Top fittings and pressure relief devices Manway Bottom outlet valve Thermal tear 7 VMSX 310740
8 VMSX 311903
9 VMSX 310400
10 VMSX 311809
Breach 11 VMSX 310404
Breach 12 VMSX 310872
Breach 13 VMSX 311626
Split in 2
14 VMSX 310095 Breach
Breach 15
VMSX 5112 Insulated
Breach
16 VMSX 310838
Breach Breach
17 VMSX 311634
Breach 18
VMSX 280529 Insulated
Breach
19 VMSX 310274
Breach
20 VMSX 311644
Breach
21 VMSX 311725
Breach
Breach 22 VMSX 311643
Breach 23 VMSX 310432
Split in 2
24 VMSX 310438
Breach
Breach
25 VMSX 310486
Breach Breach
26 VMSX 311851
Split in 2
27 VMSX 311824
Breach
28 VMSX 310054 Breach Breach
29 VMSX 311892
30 VMSX 310173
31 VMSX 311629
32 VMSX 310767
33 VMSX 310091
34 VMSX 311962
35 VMSX 311906
Railway Investigation Report R15H0013 | 57
With regard to tank car breaches, the following general observations were made: • Of the 29 derailed tank cars, 19 (66%) were breached and released various amounts of product. • Three of the tank cars (the 13th, 23rd and 26th cars) had separated completely into 2 portions. The fractures of these 3 tank cars exhibited brittle characteristics. • Of the 19 damaged tank cars, 6 sustained more than 1 type of breach. • Product release from the smaller breaches, while not instantaneous, helped feed the pool fire and contributed to spillage of product after the fire was extinguished. Damage to tank car shell 1.38.2 Nine tank cars released product as a result of shell breaches caused by collision damage. Of the 9 shell breaches, 8 (89%) were of medium to large size, which facilitated the rapid release of a large volume of product and subsequent pool fire. Consequently, the shell breaches were the most important contributor to the release of product in terms of their size and the number of cars affected. Since only 2 of the subject cars were jacketed and insulated, most tank car shells were exposed directly to some form of impact. Consequently, all of the derailed tank car shells, with the exception of the 9th, 10th, 11th, 34th, and 35th cars, exhibited some form of impact damage. The damage observed ranged from minor dents and scratches to deep localized dents and large-scale transverse buckling and crushing. The impact damage was considered indicative of collisions with objects ranging from small, relatively sharp objects (couplers, trucks) to large, blunt objects (the head of another car). Thermal damage 1.38.3 Thermal damage occurs when a tank car is exposed to a post-derailment fire. Heat-induced (thermal) tears usually occur in loaded tank cars when they are exposed to a fire and the PRD or other tank breaches are unable to vent the rising internal pressure. This can result in an energetic rupture of the tank. When Class 3 flammable liquids are involved, the sudden release of the pent-up pressure usually results in the loss of lading as a large fireball and subsequent fire within the tank that often burns off remaining product to atmosphere. Tank ruptures caused by overheating generally fracture longitudinally along an axis that is perpendicular to the hoop stress in the tank shell. Of the 27 tank cars inspected by the TSB, 21 (78%) exhibited damage indicating that they were exposed to the post-derailment fire. The fire damage ranged from scorched paint to changes in surface carbon content and external oxidation, consistent with exposure to crude oil and air at elevated temperature. No perforation caused by fire damage (burn-through) was observed in any of the subject cars. The examination revealed the following: • Seven tank cars sustained breaches due to thermal tears resulting from exposure to post-derailment fires.
58| Transportation Safety Board of Canada
• Of the 7 tank cars with thermal tears, 5 (the 10th, 11th, 12th, 17th, and 22nd cars) had no other breaches that might have contributed to the release of internal pressure. • Of the 7 tank cars with thermal tears, 2 (the 14th and 21st cars) had additional breaches: a head breach and a shell breach, respectively. • The thermal tears ranged in size from less than 1 foot to 16 feet. It was reported that all of the tank cars with thermal tears had lost their entire load, except for the 14th car, which had a thermal tear in its B-end head. • After shell breaches, thermal tears were the second most important contributor to the release of product in terms of their size and number of cars affected. • It has been suggested previously that PRDs with higher start-to-discharge pressure might pose a risk of building up excessive internal pressure during a fire, thus resulting in more energetic thermal tears. On tank cars equipped with a PRD of 75 pounds per square inch gauge (psig), thermal tear length ranged from less than 1 foot to 16 feet, while a 4-foot-long thermal tear was observed in the 14th car, which had a 165-psig PRD. Therefore, there was no evidence to support the hypothesis that PRDs with higher start-to-discharge pressure resulted in more energetic (larger) thermal tears. • The 15th and 18th cars were fitted with a jacket and 4-inch-thick glass wool insulation. Neither of the 2 jacketed/insulated cars sustained a thermal tear, although both were exposed to the post-derailment fire. However, both of these cars had other breaches, which likely provided a release for the internal pressure in these cars. Consequently, the extent to which the jacket and insulation were effective in delaying the internal build-up of pressure could not be determined. Damage to head shield and tank head 1.38.4 Of the 27 derailed tank cars inspected by the TSB: • 23 (85%) had some form of collision damage to their head shields. • 8 (30%) were missing one head shield and 3 (11%) tank cars had lost both head shields. Most head shields separated due to broken attachment brackets. • 17 (63%) exhibited dents in one or both tank heads. • 2 cars (the 14th and 28th cars) sustained a breached head due to impact damage. The examination results suggest that the trapezoidal half-head shields and full-height head shields fitted on the CPC-1232 tank cars were generally effective in protecting the heads against impact punctures during the derailment. Damage to top fittings and pressure relief devices 1.38.5 About half of the tank cars exhibited some form of impact damage to their protective housing. The protective housing on 2 of the cars (the 19th and 25th cars) was missing, and all of the fittings and PRD were sheared off. More specifically: • The 19th car did not exhibit any other breach. While its orientation in the pileup was unknown, this tank car reportedly lost its entire load. Given the circumstances, it is
Railway Investigation Report R15H0013 | 59
likely that the car was oriented in such a way that product flowed from the damaged top fittings and PRD to feed the pool fire. • The 25th car came to rest upright with a large shell puncture near the top fitting nozzle, and the car reportedly lost part of its load. It is likely that the product loss resulted from the combined release from the breached shell, top fittings, and PRD. Damage to manways 1.38.6 The derailed cars were equipped with hinged and bolted manway covers. On most tank cars, the manway cover was closed, and no impact damage was observed on the hinge or eyebolts. None of the manway covers had separated as a result of impact. The manway covers of the 25th and 26th tank cars were open, with some eyebolts missing or broken. These cars also each had a large shell breach, which indicated that they had experienced large collision forces during the accident. It was not determined whether the manway covers were opened during the accident or during site remediation operations. The manway cover of the 16th car was closed but the hinge was broken, the nozzle was cracked, and several eyebolts were disengaged. Burnt product residue was observed in the gap between the cover and the nozzle. Because this tank car came to rest on its left side, product likely flowed from the breached manway. This car also had a breached BOV, and reportedly lost part of its load. Damage to skid protection and bottom outlet valves 1.38.7 The BOV skid protection on 8 cars had experienced some form of impact damage. This ranged from deformation of the skid assembly caused by impact or crushing, to a broken skid or separated skid-to-shell welds, or a combination of both. Overall, the tank cars with damaged skids also had extensive shell deformation in the vicinity of the skid, indicating that they had been subjected to large collision forces. The AAR requires that “bottom outlet valve handles, unless stowed separately, […] be designed to either bend or break free on impact, or the handle in the closed position must be located above the bottom surface of the skid.”82 In this occurrence, the BOV handle assembly and securement mechanism of 13 tank cars experienced some form of impact damage. This damage ranged from impact-related deformation to complete separation of the handle assembly and securement mechanism. The BOV adaptor was sheared off at the mounting flange (the intended breaking point) of 9 cars (the 13th, 16th, 18th, 19th, 21st, 24th, 26th, 27th and 28th cars) which caused their BOV ball to be exposed. With the exception of the 13th and 28th cars, these cars also had impact- damaged or missing BOV handles.
82 Association of American Railroads, Manual of Standards and Recommended Practices, Section C-III: Specifications for Tank Cars M-1002, Appendix E, Paragraph 10.1.2.8.
60| Transportation Safety Board of Canada
The 16th, 18th, 24th, and 27th tank cars were breached from impact-damaged BOVs. On 3 of these 4 tank cars (the 16th, 18th and 24th cars), the exposed BOV ball was partially open or visibly leaking product. If the top fittings and the BOV are compromised, the fitting that comes to rest in the highest position can act as a vent, which greatly increases the rate of flow from the other compromised appurtenance. Two of the 4 tank cars also had another type of breach: for example, o the 16th car had a manway breach. Three of the cars released product as a result of BOV handle movement, which likely occurred during the derailment or site remediation. Specifically: • The BOV adaptor on the 16th tank car (VMSX 310838) was sheared off, exposing the BOV ball. The BOV was leaking product. The BOV operating handle assembly and securement mechanism were deformed and pushed against the tank. The BOV ball had no fire damage, which suggests the adaptor was sheared off during remediation operations. The manway of this car was also leaking. • The BOV adaptor on the 18th tank car (VMSX 280529) was sheared off. The BOV operating handle assembly had no visible impact damage, but it was unsecured, as the securement mechanism had separated. The exposed BOV ball was oxidized and partially open. The handle assembly had separated completely during site remediation, and the BOV ball was free to rotate. Although the BOV ball’s original position after the derailment was not determined, it is considered most probable that product was released from the compromised BOV. • The BOV adaptor on the 27th tank car (VMSX 311824) was sheared off. The BOV operating handle securement mechanism was extensively deformed from impact and the handle was unsecured. The condition of the exposed ball valve when the car came to rest could not be precisely determined. However, this car was positioned with the BOV pointing upwards during site remediation, and it was reported to have released some of its load during the derailment. This suggests that the release likely originated from the BOV. The investigation into a 2013 derailment in White River, Ontario, involving pre–CPC-1232 Class 111 tank cars (TSB Investigation Report R13T0060) had previously identified this issue. TSB Rail Safety Advisory 15/13 was issued to TC to communicate the risk of product loss through BOV handles that are damaged during derailments. This risk was also identified during the investigation into the 2013 derailment of 63 Class 111 tank cars in Lac-Mégantic (TSB Investigation Report R13D0054). 1.38.7.1 National Transportation Safety Board recommendation regarding bottom outlet valves Following an investigation into the 2009 derailment of a CN freight train Cherry Valley, Illinois (2009), the NTSB determined that “existing standards and regulations for the protection of bottom outlet valves on tank cars do not address the valves’ operating mechanisms and therefore are insufficient to ensure that the valves remain closed during
Railway Investigation Report R15H0013 | 61
accidents.”83 The NTSB recommended that the Pipeline and Hazardous Materials Safety Administration: Require that all bottom outlet valves used on newly manufactured and existing non- pressure tank cars are designed to remain closed during accidents in which the valve and operating handle are subjected to impact forces. (R12-6)84 Damage to stub sill 1.38.8 Tank car stub sills are prohibited from being attached directly to the tank shell. The AAR requires that reinforcement pads be attached to the tank shell and that the stub sills be attached to the reinforcement pads. The AAR also requires that the reinforcement pad be extended on either side of the sill attachment and at the head brace attachment. 85,86 These requirements are intended to prevent product release by ensuring that, if a stub sill is overloaded, the separation occurs between the sill and the reinforcement pad, and does not propagate into the tank shell. The majority of the derailed tank cars had at least 1 damaged stub sill or coupler assembly. The 23rd and 28th tank cars had stub sill damage that extended into the tank. Detailed examination revealed that: • The 23rd tank car had a small crack that had started in the head brace-to-stub sill attachment weld, propagated into the front sill pad-to-head weld and subsequently into the A-end tank head. However, the small head crack is considered to be an insignificant source of release when compared to the large shell breach sustained by this tank car, as it had separated into 2 portions. • The 28th tank car was breached as a result of impact-damaged A-end stub sill attachments. Test coupons were taken from the damaged stub sill areas for detailed examination at the TSB Laboratory to validate the stub sill design, and the following observations were made: o The A-end of the tank car experienced multiple elevated impacts during the accident. o A front sill pad had fractured and separated from the A-end tank head. o The fracture initiated in the front part of the sill pad in a ductile overstress mode and propagated through fillet welds that joined the sill pad to the tank head. o The fracture then propagated inboard through the fillet welds until it reached the longitudinal welds that join the bolster pads to the front sill pad.
83 United States National Transportation Safety Board (NTSB), Railroad Accident Report NTSB/RAR-12-01: Derailment of CN Freight Train U70691-18 With Subsequent Hazardous Materials Release and Fire, Cherry Valley, Illinois, June 19, 2009 (Washington, DC: 14 February 2012), p. 88. 84 Ibid., p. 90. 85 Association of American Railroads, Manual of Standards and Recommended Practices, Manual C-III M-1002, Chapter 6, Paragraph 6.1.2.5. 86 Ibid., Chapter 6, Paragraphs 6.1.2.5.2 and 6.1.2.5.3, and Appendix E, Part 13.0.
62| Transportation Safety Board of Canada
o The fracture then propagated into the tank shell, which resulted in a breach on both sides. o The shell and head fractures had a mostly brittle appearance. o The elevated multidirectional loading associated with the impacts likely exceeded the stub sill design criteria and caused the cracks to propagate from the front sill pad attachment welds into the shell and head in a low-energy (brittle) manner. Tank shell material properties 1.38.9 Metallurgical testing was conducted on coupons taken from the 29th tank car (VMSX 311892), which was made of AAR TC128 Grade B normalized steel plates of the same vintage as the other derailed tank cars. It was determined that: • The head and shell coupons met the applicable requirements for chemical composition and tensile properties. • Because none of the derailed tank cars were specified for low-temperature service, there were no applicable impact energy absorption material requirements. • Notwithstanding, charpy V-notch impact energy results obtained for specimens tested at −45.6 °C (50 °F) indicate that the material satisfied the AAR’s impact energy requirements for low-temperature service. • Some tank cars exhibited ductile punctures, whereas others sustained brittle fractures consistent with low-energy crack propagation. • During a collision, the strain rate and degree of stress triaxiality87 prevalent at the fracture location can vary significantly depending on factors such as collision force, impact orientation and speed, and tank internal pressure.88 It is well known that the tendency for brittle fracture of steel increases with an increase in the strain rate or in the degree of stress triaxiality.89 Thus severe collision conditions that result in high strain rate or stress triaxiality may cause the tank material to behave in a more brittle manner than would be expected from the charpy V-notch results. 1.38.9.1 Summary of tank car examination The examination results determined that: • The tank car head and shell material met the requirements for chemical composition and tensile properties of the specified AAR TC128 Grade B normalized steel.
87 The state of stress at a given point is defined by 3 principal stresses on mutually perpendicular planes. A triaxial stress condition refers to a state of stress in which none of these 3 principal stresses are 0. 88 T.L. Anderson and S.W. Kirkpatrick, Quantifying and Enhancing Puncture Resistance in Railroad Tank Cars Carrying Hazardous Materials, Phase I: Preliminary Study (Report prepared by Structural Reliability Technology Inc. and Applied Research Associates Inc. for The Chlorine Institute, September 2006), pp. 47–56. 89 M.A. Meyers and K.K. Chawla, Mechanical Metallurgy, (New Jersey: Prentice-Hall Inc., 1984), p. 149.
Railway Investigation Report R15H0013 | 63
• The head shields and top fitting protection on the CPC-1232 tank cars were generally effective in protecting the heads and appurtenances during the derailment. • Some tank cars exhibited ductile punctures, whereas others sustained brittle fractures consistent with low-energy crack propagation. • It is likely that the combined effects of the low ambient temperature and collision conditions produced a high strain rate and high degree of stress triaxiality at the fracture locations, which resulted in the brittle tank fractures observed. • The performance of the Class 111 tank cars constructed to the CPC-1232 standard was considered to be similar to that of the legacy Class 111 tank cars examined during the TSB Lac-Mégantic investigation.90 1.38.9.2 Dangerous goods placards The Transportation of Dangerous Goods Regulations require the class placard and UN identification number for the DGs contained in a tank car to be displayed on each side and on each end of the tank car. All of the derailed tank cars were loaded with petroleum crude oil product (UN1267). While most tank cars displayed the appropriate UN 1267 placard, placards on the 31st and 34th tank cars displayed UN 1268 (petroleum distillates). The DG safety marks displayed on these 2 cars did not meet federal regulations, as they incorrectly identified the product. In addition, 1 tank car displayed placards with mismatched UN numbers. 1.39 TSB safety issues investigations In response to a series of train derailments on secondary main lines involving broken rails in the winter of 2003–2004, the TSB carried out a safety issues investigation.91 The study established a significant relationship between rail defects and the level of bulk unit train traffic and found that the effect of increasing bulk train traffic had not been accommodated through regular maintenance. The same circumstances could also apply to mainline track. The study also identified that: • Railways recognized that the rate of track degradation was accelerated with increases in bulk unit train tonnage. However, an appropriate balance between increased track degradation and timely infrastructure maintenance and/or renewal was not always achieved. • Compliance with the TSR in and of itself was insufficient to ensure safety since it did not provide a means to anticipate changing conditions such as increased traffic over the long term. • There was a need for more proactive SMS processes to anticipate operational conditions which could lead to a degradation of safety margins.
90 TSB Railway Investigation Report R13D0054. 91 TSB Safety Issues Investigation Report SII R05-01, Analysis of Secondary Main-Line Derailments and the Relationship to Bulk Tonnage Traffic (2005).
64| Transportation Safety Board of Canada
- 40 TSB Watchlist
The TSB Watchlist identifies the key safety issues that need to be addressed to make Canada’s transportation system even safer. Safety management and oversight 1.40.1 Transportation companies have a responsibility to manage safety risks in their operations. SMS provides a framework to achieve this end, and many companies implement a formal SMS either voluntarily or to comply with TC’s SMS Regulations. Even small companies need to have some safety processes in place to manage risk. Some companies consider safety to be adequate as long as they are in compliance with regulatory requirements, but regulations alone cannot foresee all risks unique to a particular operation. That is why the TSB has repeatedly emphasized the advantages of SMS, an internationally recognized framework to allow companies to effectively manage risk and make operations safer. The move toward an SMS regime must be supported by appropriate regulatory oversight. Given that regulators will encounter companies with varying degrees of ability or commitment to effectively manage risk, this oversight must be balanced. It needs to include proactive auditing of companies’ safety management processes, ongoing education and training, and traditional inspections to ensure compliance with existing regulations. Moving forward, 3 elements are key: a clear regulatory framework requiring companies to implement an SMS appropriate to the scope and size of its operations; SMS that are effective in identifying hazards and mitigating risks; and balanced regulatory oversight. Previous TSB investigations have revealed some problems: • Although all rail operators in Canada are required to have an SMS, the TSB has identified instances where SMS processes were weak or not used, resulting in hazards going unidentified and risk mitigations not being put in place. 92 • With respect to TC regulatory oversight, 2 problems have been observed: a failure to identify companies’ ineffective processes, and an imbalance between auditing processes versus traditional inspections. To resolve these problems, companies that do have an SMS must demonstrate that it is working (i.e., that hazards are being identified and effective risk mitigation measures are being implemented). When companies are unable to effectively manage safety, TC must not only intervene, but do so in a manner that succeeds in changing unsafe operating practices.
92 TSB railway investigation reports R14W0256, R14Q0045, R13D0054, and R09T0057.
Railway Investigation Report R15H0013 | 65
Transportation of flammable liquids by rail 1.40.2 In November 2014, the TSB added “Transportation of flammable liquids by rail” to its Watchlist issues. This issue remained on TSB’s Watchlist in 2016. The transportation of crude oil by rail across North America increased exponentially starting in 2009, peaking in 2014 at 238 000 carloads in Canada93 and 500 000 carloads in the United States. 94 Ethanol shipments, meanwhile, were relatively stable, with an average of 76 250 carloads per year in Canada and 331 000 carloads per year in the United States.95 Despite recent downward trends, the volume of flammable liquids being transported by rail is expected to remain significant. The TSB is concerned that current railway operating practices, combined with the vulnerability of older tank cars used to transport crude oil and other flammable liquids, are not adequate to mitigate effectively the risk posed by the transportation of large quantities of such dangerous goods by rail. The vulnerability of Class 111 tank cars has been recognized for years.96 The Board has called for tougher standards for all Class 111 tank cars97—not just new ones—to reduce the likelihood of product being released during accidents. A number of accidents investigated in the U.S. by the NTSB have also highlighted the vulnerability of Class 111 tank cars.98 The TSB is encouraged that federal regulators in Canada and the U.S. have taken considerable action to address the situation, including the promulgation of a more robust tank car standard (Class 117), retrofit provisions, implementation timelines, and regulatory monitoring and enforcement. The actions to date by the federal regulators and the railway industry have contributed to a significant decline in the use of legacy Class 111 tank cars to transport crude oil since 2014. Although the federal regulators and the railway industry have taken actions with respect to tank car safety, federal regulations nonetheless allow Class 111 tank cars to be used for the transport of certain flammable liquids until mid-2025. Consequently, until all higher-risk flammable liquids in North America are transported in more robust tank cars with enhanced protection, an elevated risk will remain.
93 Crude oil shipments moved by Canadian Class 1 railways. 94 Railway Association of Canada and Association of American Railroads. 95 2009 to 2015. 96 TSB Recommendation R07-04. 97 TSB Recommendation R14-01. 98 New Brighton, Pennsylvania (October 2006); Cherry Valley, Illinois (June 2009); Tiskilwa, Illinois (October 2011); Columbus, Ohio (July 2012); and Casselton, North Dakota (December 2013); Lynchburg, Virginia (April 2014); Mount Carbon, West Virginia (February 2015); Heimdal, North Dakota (May 2015); Lesterville, South Dakota (September 2015).
66| Transportation Safety Board of Canada
Since the Lac-Mégantic derailment in July 2013 (TSB Railway Investigation Report R13D0054), other recent derailments in Canada,99 including this occurrence, have demonstrated that there can be significant risk to people, property, and the environment when trains carrying large volumes of flammable liquids derail. These recent occurrences highlight the need for strategic route planning and safer operations of all trains carrying dangerous goods in Canada. Railways must carefully choose the routes on which crude oil and other flammable liquids are to be carried, and ensure that train operations over those routes will be safe. These risks must be dealt with as a North American transportation issue, because these products are transported across borders by rail operators. To resolve these issues, railway companies must conduct thorough route planning and analysis, and perform risk assessments to ensure that risk-control measures are effective. Additionally, flammable liquids must be shipped in more robust tank cars to reduce the likelihood of a dangerous goods release during accidents. 1.41 TSB laboratory reports The following TSB laboratory reports were completed in support of this investigation: • LP 055/2015 – Examination of Rail Joint and Pieces • LP 056/2015 – Examination of Tank Cars • LP 057/2015 – Analysis of Crude Oil Samples • LP 146/2015 – Examination of Tank Car Coupons
99 TSB railway investigations R15H0021, R14W0256, R15V0046, R14W0256, and R14M0002.
Railway Investigation Report R15H0013 | 67
- 0 Analysis
The train was operated in accordance with company and regulatory requirements. The rolling stock was maintained in good condition, and there were no defects observed that could be considered contributory to this occurrence. The analysis will focus on the joint bar failure, assistant track supervisor (ATS) training and mentoring, tank car performance, crude oil properties, speed of key trains, Canadian National Railway Company’s (CN’s) safety management system (SMS) and corridor risk assessment, CN’s incident command and emergency response, regulatory overview, and environmental impact. 2.1 The accident In this occurrence, a CN crude oil unit train was proceeding eastward at about 38 mph on the Ruel Subdivision when it experienced a train-initiated emergency brake application at Mile 111.7, near Gladwick, Ontario. Twenty-nine CPC-1232 compliant Class 111 tank cars derailed; 19 tank cars were breached, and about 1.7 million litres of product were released to either surface or atmosphere. The product ignited, and fires burned for 5 days. There was no evacuation, and there were no injuries. The leading L1 wheel tread of the 8th car (VMSX 311903) exhibited impact marks that were consistent with having impacted an exposed rail end. Circumferential abrasion marks were observed on the outboard rim face of the trailing L4 wheel, indicating that the wheel had dropped into gauge. Approaching the derailment site from the west, no impact marks were observed on the track infrastructure. A broken insulated joint was observed in the south rail, near the signal mast at Mile 111.7. The absence of marks on the infrastructure approaching the broken insulated joint at Mile 111.7, the impact marks on the L1 wheel of the 8th car, and abrasion on the rim face of the L4 wheel on the 8th car were each significant. Based on these observations, the derailment occurred when the insulated rail joint in the south rail at Mile 111.7 failed beneath the head-end of the train and allowed the trailing L4 wheel of the 8th car to drop into gauge, which spread the rails and caused the trailing cars to derail. 2.2 Joint bar failure The joint bars met material requirements. Detailed examination of the failed joint bar revealed that the fracture surfaces exhibited beach marks, which were typical of fatigue cracking. The fractures initiated at the upper fishing surface (the mating surface between the top of the joint bars and the underside of the rail head) on the top of both joint bars. The fatigue fracture origins were coincident with corrosion pitting observed on the outer surfaces of the joint bars. The fatigue cracking propagated vertically downward for approximately 20% of the joint bar cross-sectional area before transitioning to an overstress (brittle) rupture. The failure of the insulated joint bars was caused by the overstress (brittle) extension of corrosion-initiated reverse bending fatigue cracks, which initiated at the upper mating surface between the top of the joint bars and the underside of the rail head.
68| Transportation Safety Board of Canada
- 3
Effect of cold weather The temperature at the time of the accident was −31 °C. Rail steel and joint bar steel are both known to have reduced fracture toughness and ductility at low temperatures, particularly when fatigue defects are already present in the joint bars and the rail joints are subjected to significant stress due to contraction of continuous welded rail (CWR) in cold weather. Stress can also be imparted into the track infrastructure as a result of repeated wheel impacts caused by damaged wheel treads, out-of-round wheels, or track surface conditions such as rail end batter (REB) or localized surface collapse (LSC). The insulated joint was subjected to repeated wheel impacts or deflections while in service for at least 3 months before the failure. Such impacts would contribute to the growth of any fatigue cracks present and would impart elevated stresses into the track structure, particularly during periods of severe cold. The cold temperature at the time of the occurrence made the joint bar material more susceptible to brittle failure. Once the joint bar fatigue cracks reached a critical size, the bars could no longer sustain service loads, and subsequently failed. 2.4 Rail end batter and joint bar cracks REB will occur at a rail joint when the ends of the rail heads within the joint are mismatched or the gap between the rail ends is too large. REB is indicative of a degrading joint support that can result in excessive joint movement. If joints are not properly supported, wheel impact forces can lead to increased vertical rail deflections; loosening and deterioration of the joint assembly; REB; degradation of the ties, ballast, and subgrade; and ultimately, rail or joint failure. Typically, fatigue cracks take time to develop. In this occurrence, the joint bar fatigue cracks extended to the outer surface of each joint bar just under the rail head. This suggests that they were likely visible for some time before the failure, and may have been present when the REB was initially detected. When cracks are detected in joint bars, the Transport Canada (TC)–approved Rules Respecting Track Safety, also known as the Track Safety Rules (TSR), and CN protocols require that the bars be replaced immediately. If the joint bars cannot be replaced immediately, as can be the case with bonded insulated joints, a slow order must be placed on the track, or the track must be removed from service. However, in this occurrence, the joint bar fatigue cracks were not detected, and there was no apparent awareness that the REB conditions would increase stress on the joint bars. Had this relationship been understood, it may have also prompted closer inspection of the joint bars when the REB was being monitored. Since the joint bar fatigue cracks extended to the outer surface of each joint bar just under the rail head, the cracks had likely been visible for some period of time prior to failure, yet were undetected despite numerous CN inspections.
Railway Investigation Report R15H0013 | 69
- 5
Monitoring of rail end batter condition and joint bar inspection The ATS had begun working for CN in February 2013 as an assistant track foreman. In May 2014, he was promoted to ATS on the Ruel Subdivision based out of Foleyet, Ontario, and began the CN ATS training program. Between May 2014 and February 2015, the ATS carried out his duties while completing the on-the-job training (OJT) blocks of the ATS training program as he gained additional experience. The recorded 1-inch low spot within the insulated joint at Mile 111.7, which also contained the REB condition, indicated that joint support was within limits, but was deteriorating. The ATS was aware of the conditions and had planned to have the REB condition temporarily repaired by welding at various times during December 2014 and January 2015. However, attempts to have this repair work completed were unsuccessful. Instead, the ATS visually monitored the REB condition, and at times took rail surface measurements. The measurements were not recorded, nor were they required to be. Because the REB condition and the corresponding low spot did not exceed the limits set out in the TSR or CN Engineering Track Standards (ETS), no action was immediately required to be taken, and there was no urgency to make the repair. The ATS was relatively new to the rail industry and the ATS position, had not yet completed the ATS training program, and had received little supervision during the OJT portion of the training. Moreover, the section of track for which the ATS was responsible had a number of rail defects and rail surface conditions that required monitoring in addition to track inspection duties. At times, these factors, combined with limited track time, extended the ATS’s work day up to 16 hours for consecutive days. In fulfilling track inspection and maintenance duties, the ATS was primarily concerned with monitoring the REB condition within the insulated joint at Mile 111.7. The ATS lacked sufficient experience to recognize the 1-inch low spot as being indicative of degrading joint support, the effect of repeated wheel impacts on the degrading joint support, and the need to closely inspect the joint bars for cracks when monitoring the REB condition. Canadian National Railway Company track inspection guidelines 2.5.1 CN track inspection guidelines for joint inspection did not make reference to the fact that poor joint support is often at the root of REB, joint bar fatigue, bolt hole cracking and, ultimately, joint assembly failure. The remedy for REB is not limited to welding the rail head. The joint must also be lifted and the ballast tamped to ensure that the joint is properly supported. Welding alone will temporarily fix REB, but it will only delay the development of further REB degradation unless the underlying support conditions are properly addressed. While this may be intuitive for experienced track inspectors, it may not be so for newly hired and promoted ATSs. The CN track inspection guidelines did not make reference to the potential causal link between poor joint support and joint assembly defects. Consequently, training for CN ATSs related to REB, joint bar fatigue, bolt hole cracking, and joint assembly failure was insufficient to enable the ATS to understand the relationship between an unsupported joint
70| Transportation Safety Board of Canada
and the development of joint defects. If the training program does not reference key remedial measures for maintaining rail joints, new track engineering personnel may not fully understand the available mitigation strategies, increasing the risk that track conditions will not be addressed in an effective and timely manner. Canadian National Railway Company Engineering Track Standards 2.5.2 The TSR contain no guidance or condemning criteria related to REB conditions, which are categorized as rail surface conditions rather than rail defects. While REB conditions are not considered to be service failures, they are considered indicators of potential emerging rail defects. CN has recognized that emerging conditions can lead to rail or joint failure and has put measures in place to mitigate these risks. For example, CN ETS track standard (TS) 1.7 – Rail Testing and Remedial Action for Broken Rail requires that during winter months, the REB condition be measured twice a week if joint REB is found to be greater than 3.5 mm. In this occurrence, while the REB condition was not yet at the 3.5 mm limit, as a precaution, the ATS was monitoring the condition twice weekly. However, there was no further guidance in CN ETS TS 1.7 to indicate that the joint bars should be inspected for cracks at the same time that the REB was being measured. While inspecting the joint bars for cracks may be intuitive to an experienced employee, it may not necessarily be the case for an inexperienced track maintenance employee such as the ATS. The lack of specific guidance may become even more problematic, as many of CN’s newly hired ATSs do not have significant experience in the railway industry. If company standards for monitoring REB conditions do not include guidance to inspect joint bars for cracks at the same time the REB is measured, joint bar cracks may not be detected in a timely manner, increasing the risk of rail joint failures. Emerging joint bar inspection technology 2.5.3 The TSR indicate that “[i]f joint bars are inspected electronically including the use of camera or other technology capable of detecting joint bar defects, a Walking Track Inspection […] is not required.”100 A walking track inspection must be completed on all track with curves of 4 degrees or greater. Alternate forms of technology to detect joint bar cracks that can be used instead of walking joint inspections are emerging, including high-speed cameras and ultrasonic inspection systems. A machine vision-based system for joint bar inspection uses high-speed cameras and can inspect at speeds of up to 70 mph. The system features 4 line-scan cameras mounted on a hi- rail or rail-bound vehicle that continuously capture high-resolution images from both sides of each rail. An on-board computer system automatically saves each joint bar image and analyzes it for visible fatigue cracks. The images can be analyzed for missing bolts and other visible joint bar and rail defects. However, only cracks and defects that are visible to the outside surface (exposed) of the joint bars are visible to the cameras.
100 Transport Canada, Rules Respecting Track Safety (25 May 2012), Section 2.5(a).
Railway Investigation Report R15H0013 | 71
In comparison, the ultrasonic inspection system can detect joint bar cracks in the area of the joint bar that cannot be inspected by visual or optically aided inspection techniques. This approach allows for better detection of cracks located on the top inside surface of the middle portion of the joint bar, which is where most joint bar fatigue cracks initiate. Both systems can provide improvements in productivity and worker safety. They inspect the joint bars from a moving vehicle instead of having inspectors walk along an active railway track, allowing the proactive detection of joint bar defects before they fail. While new technology for inspecting joint bars appears promising, unlike track geometry inspection and rail flaw testing, the use of high-speed cameras and ultrasonic testing to inspect joint bars is not required by regulation, and is not yet widespread throughout the industry. 2.6 Assistant track supervisor training and mentoring at Canadian National Railway Company The ability to think ahead and anticipate potential risks is termed “requisite imagination.” The development of requisite imagination, and by extension, the ability to participate effectively in safety improvement, requires personnel to have the experience, training and spare capacity to understand and respond to hazards. In this occurrence, weaknesses in CN’s development and mentoring of an inexperienced ATS limited the ATS’s ability to perform effectively in a challenging, safety-critical role. CN identifies train velocity as an issue that drives business. All engineering employees understand the sense of urgency to move trains as quickly and as safely as possible. Train delays that impact velocity create internal pressures that can sometimes create conflict between track maintenance decisions and train operations. Relatively new front-line management can be particularly affected by this pressure. Because it is important to keep trains moving, it is sometimes challenging for track maintenance personnel to get adequate blocks of track time to conduct the required track inspections, maintenance, and repairs. The ATS was a relatively new front-line engineering supervisor for the territory, and was responsible for conducting track inspections and monitoring track conditions, as well as prioritizing and scheduling track work. Although the ATS had difficulty keeping up with the high workload, every effort was made to address track defects before issuing a temporary slow order that would affect train velocity. Because the ATS was successful in maintaining the minimum track standards, there were few slow orders or other indicators to alert senior managers to the challenges on the Ruel Subdivision. Senior management viewed the absence of slow orders as a sign that staffing and maintenance were adequate. Since 2013, CN had been delivering a 4-day communication and leadership program entitled LEAD to front-line supervisors and mid-level managers which included some mentoring. However, at the time of the accident, neither the track supervisor nor the ATS had received this training. The ATS had limited experience, having begun performing the job while still completing the last 5 months of the 12-month ATS training program. During the OJT portion of the ATS
72| Transportation Safety Board of Canada
training, the ATS worked independently with little mentoring and minimal support from either the track supervisor or the senior manager engineering (SME), both of whom also had limited time to spend with the ATS due to the work demands of their positions. CN had developed a training program for ATS candidates that covered the knowledge and skills required of the ATS position. However, there were gaps within the training. During the OJT portion of their training, ATS candidates were not assigned a specific mentor or trainer, yet they were responsible for completing their own checklist as they were exposed to certain track maintenance skills and activities. The OJT process was generally informal, with no direct supervision or feedback to reinforce positive behaviour or correct misperceptions. As a result, CN’s ATS training program provided little mentoring or support to ATS candidates during the on-the-job field portion of their training to help them develop the competencies required to be effective in a highly demanding and challenging safety-critical position. CN had some difficulty retaining employees in the ATS position. The previous ATS candidate on this territory had resigned after completing the training program. The ATS at the time of the occurrence had been in the position for less than 1 year. The ATS at the time of the occurrence had the confidence of CN management and had been identified as having the potential to be a good supervisor. However, the demands of the job, combined with a lack of adequate mentoring and a lack of track supervisor support, made it difficult for the ATS to continue to develop in that position. Following the occurrence, the ATS resigned from his position and voluntarily returned to the unionized ranks. An ATS is a highly demanding position which can sometimes lead to staff turnover. On the Ruel Subdivision, at the time of the occurrence, the level of track expertise that was available to manage track infrastructure and maintenance crews, perform track inspections, anticipate and plan to mitigate potential problems, and monitor combinations of various emerging track defects and track conditions was sparse, and the territory was large. As a result, the demands placed on remaining CN engineering staff, including the newly hired ATS working as a fully qualified ATS, left portions of the Ruel Subdivision vulnerable. If ATS candidates do not receive adequate mentoring and support during the on-the-job portion of their training, there is an increased risk that ATSs will lack the necessary expertise in this safety critical position, despite completing the ATS training program. 2.7 Petroleum crude oil sample analysis The laboratory analysis of the product samples determined that both products had similar chemical and physical properties and were consistent with those of a light, sweet crude oil. The test results were also consistent with the product information provided in the material safety data sheets (MSDS), and the products were appropriately classified. The products exhibited somewhat lower vapour pressure than but similar density, viscosity and volatility to that of the Bakken Shale crude oil involved in the Lac-Mégantic occurrence (TSB Railway Investigation Report R13D0054). The low flash point of the petroleum crude oil explains why it ignited so quickly once the tank cars were breached. The large quantities of spilled product and the product’s rapid rate
Railway Investigation Report R15H0013 | 73
of release, high volatility, and low viscosity contributed to the ignition of large post- derailment fires and the pool fire. Dangerous goods placards on tank cars 2.7.1 All of the derailed tank cars were loaded with petroleum crude oil product (UN1267). While most tank cars displayed the appropriate UN1267 placard, placards on the 31st and 34th tank cars displayed UN1268 (petroleum distillates). The dangerous goods safety marks displayed on these derailed tank cars did not meet federal regulations; they displayed UN1268 placards, whereas their lading was classified as UN1267. In this occurrence, the discrepancy did not represent a significant risk to safety, as both products had similar properties, and the emergency response procedures required were the same for both products. However, under different circumstances, the discrepancy between shipping information and the placard displayed on the tank car could have been confusing and could have placed emergency responders at risk. If the placards displayed on a tank car do not match the shipping information, emergency responders will not be fully aware of the tank car contents and may unknowingly place themselves in a vulnerable situation, increasing the risk of injuries. 2.8 Tank car performance Historically, legacy Class 111 tank cars were built with a gross rail load (GRL) capacity of 263 000 pounds. In the mid-1990s, the industry began moving towards a Class 111 tank car with a GRL capacity of 286 000 pounds. In the late 1990s, TC, the U.S. Department of Transportation (DOT), and the American Association of Railroads (AAR) established a number of requirements for tank car GRL to be increased to 286 000 pounds. The requirements included increased puncture resistance for the tank heads and shells, increased design loads and enhanced protection of service equipment. These requirements were further incorporated into TC and AAR standards for tank cars with a GRL of 286 000 pounds but did not apply to the majority of Class 111 tank cars at the time which had a GRL of 263 000 pounds. The next step was to address the cars with a GRL of 263 000 pounds. For its part, the AAR issued CPC-1232, the requirements of which were similar to those for 286 000 pound GRL cars. CPC-1232 incorporated a number of enhancements and applied to all newly constructed Class 111 tank cars (ordered since October 2011) used for the transport of dangerous goods (DG) Class 3 flammable liquids (Packing Group I and II) such as crude oil, ethanol, and methanol. The CPC-1232 safety enhancements included: • additional top fitting protection; • use of reclosing pressure relief devices (PRDs); • use of normalized steel for tank shells and tank heads; • increased minimum material thickness (½-inch) for all tank cars that were not jacketed and insulated; and • ½-inch thick half-head shields.
74| Transportation Safety Board of Canada
In April 2014, in response to TSB Recommendation R14-01, TC announced a 3-year phase-out of older, less crash-resistant legacy Class 111 tank cars. In July 2014, the TP 14877 standard was adopted by reference in the TC Transportation of Dangerous Goods Regulations (the TDG Regulations), which aligned federal regulations with the 2011 AAR CPC-1232 standard. All tank cars involved in this occurrence were CPC-1232 compliant. Shell breaches 2.8.1 Of the 29 derailed tank cars, 19 (66%) were breached and released various amounts of product. Nine of the cars released product as a result of breached shells. These shell breaches were caused by a collision sustained during the derailment. Of the 9 shell breaches, 8 (89%) were of medium to large size. Three of the 8 tank cars had separated completely into 2 sections. These failures facilitated the rapid release of a large volume of product and subsequent pool fire. Release from the smaller breaches, while not instantaneous, also contributed to feeding the pool fire and to spillage of product after the fire was extinguished. Thus, shell breaches were the most important contributors to the release of product in terms of the size of the breach and the number of cars affected. Eight of the 29 derailed tank cars sustained medium to large shell breaches during the derailment, immediately releasing their lading, which ignited and resulted in a large pool fire. Breaches caused by thermal tears 2.8.2 Of the 27 tank cars inspected by the TSB, 21 (78%) exhibited damage indicating that they were exposed to the post-derailment fire. Only 2 of the 21 tank cars exposed to fire were jacketed and insulated. Thus, for 19 of the tank cars exposed to post–accident fire, the fire impinged directly on the tank shell surface, which in turn would have rapidly heated the product inside the car. The fire damage ranged from scorched paint to changes in surface carbon content and external oxidation consistent with exposure to crude oil and air at elevated temperature. There was no other perforation (burn-through) observed in any of the subject cars. Seven tank cars sustained breaches caused by thermal tears, which resulted from exposure to the post-derailment pool fire. The released product also ignited and further fed the fire. The tank cars with thermal tears had lost their entire load, except for the 14th car, which had a thermal tear in its B-end head. Thus, thermal tears were the second most important contributor to the release of product in terms of their size and the number of cars affected. None of the 7 tank cars that were breached from thermal tears were equipped with jackets or thermal protection. While 5 of the 7 tank cars exhibited no other breaches that might have contributed to the release of internal pressure, 2 tank cars (the 14th and 21st cars) also sustained a head breach and a shell breach, respectively. The absence of tank-car thermal protection likely increased the severity of the product release and further fueled the fire, as 7 tank cars sustained thermal tears after exposure to the pool fire.
Railway Investigation Report R15H0013 | 75
Neither of the 2 jacketed and insulated cars sustained a thermal tear, although both were exposed to the post-derailment fire. However, both of these cars also sustained other breaches, which likely provided a release for the internal pressure in these cars. Consequently, the extent to which the jacket and insulation were effective in delaying the internal build-up of pressure could not be determined. Although the 15th and 18th tank cars were jacketed, insulated and exposed to the pool fire, the cars had sustained other breaches. Since these other breaches likely released internal pressure, the effect that the jacket and insulation had in delaying the internal build-up of pressure could not be determined. It has been suggested previously that PRDs with higher start-to-discharge pressure might pose a risk of building up excessive internal pressure during a fire, thus resulting in more energetic thermal tears. Of the 7 tank cars with thermal tears, 6 were equipped with a PRD of 75 pounds per square inch gauge (psig). Thermal tear length on these cars ranged from less than 1 foot to 16 feet. In comparison, a 4-foot-long thermal tear was observed in the 14th car, which had a PRD of 165 psig. Therefore, for the 7 tank cars that exhibited thermal tears, there was no evidence to support the hypothesis that PRDs with higher start-to-discharge pressure result in more energetic (larger) thermal tears. Head and head shield damage 2.8.3 Of the 27 derailed tank cars inspected, 23 (85%) had some form of collision damage to their head shields and 17 (63%) of the cars had dented heads. Eight (27%) of the tank cars were missing 1 head shield, and 3 (11%) of the tank cars had lost both. Most head shields separated due to broken attachment brackets. Only 2 (7%) tank cars (14th and 28th) sustained a head breach due to impact damage. The results of the examination suggest that, in this occurrence, the trapezoidal half-head shields and full-height head shields fitted on the CPC- 1232 compliant tank cars were generally effective in protecting the heads against impact punctures during the derailment. Manway, top fitting, and pressure relief device damage 2.8.4 The manway cover of the 16th tank car had a broken hinge, while the nozzle was cracked and several eyebolts were disengaged. Burnt product residue was observed in the gap between the cover and nozzle. Because this tank car came to rest on its left side, product likely flowed from the breached manway. About half of the tank cars exhibited some form of impact damage to their protective housing. The protective housing was missing, and all of the fittings and the PRD were sheared off from 2 tank cars (the 19th and 25th cars). The small number of tank cars with breached manways, top fittings, and PRDs suggests that the features incorporated for top- mounted appurtenances were generally effective in reducing the release of product. Bottom outlet valve damage 2.8.5 If a loaded tank car comes to rest in an inverted position after the top fittings have been compromised during a derailment, product leakage can occur from the top fittings. Similarly, if a tank car comes to rest in an upright position and the bottom outlet valve (BOV)
76| Transportation Safety Board of Canada
has been compromised, product can be released from the BOV. If the top fittings and the BOV are compromised, the fitting that comes to rest in the highest position can act as a vent, which can greatly increase the rate of flow from the other compromised appurtenance. To minimize and mitigate product release during a derailment, protection of both the top fittings and the BOV is necessary. Four of the tank cars (the 16th, 18th, 24th, and 27th cars) were breached from impact- damaged BOVs. On 3 of these 4 tank cars (the 16th, 18th, and 24th cars), the exposed BOV ball was partially open or visibly leaking product. In each of these 3 cases, the BOV operating handle was either deformed or had separated from the car. This highlights the need for a better BOV design for ball valves equipped with handles. TSB Rail Safety Advisory 15/13 and 2 previous TSB investigations (R13T0060 and R13D0054) had identified this issue. In these occurrences, the tank car BOV handle design for the Class 111 tank cars was insufficient to protect the ball valve from being actuated when the handle was broken off, deformed, or otherwise unintentionally moved during the derailment or site remediation. Problems with BOV handles have been previously identified in other accident investigation reports. In 2012, the National Transportation Safety Board (NTSB) recommended design changes to ensure that BOVs remain closed during derailments. However, at the time of car construction, the recommended changes had not been made. Without modifications to the handle design, these types of releases have continued to occur during derailments. In this occurrence, although the BOV handle designs met the AAR standards, the handles were exposed and moved during either the accident or site remediation, which resulted in the release of product. The design of the tank car BOV handle was inadequate to protect against product release during the derailment, and contributed to the severity of the release. If BOV handles continue to be exposed without adequate protection, there is an increased risk of product release in the event of a derailment and during subsequent site remediation. Stub sill damage 2.8.6 The 28th tank car was breached as a result of impact damage sustained by the A-end stub sill attachments. The examination concluded that the A-end of the tank car had experienced multiple elevated impacts during the accident. As a result, the front sill pad fractured and separated from the A-end tank head. The fracture then propagated into the tank shell on each side, which caused 2 shell breaches despite AAR design requirements that should prevent such shell breaches from occurring. The shell and head fractures had a mostly brittle appearance. The severity of the multidirectional impacts sustained by the A-end of the 28th tank car had likely exceeded the stub sill design criteria and caused the cracks to propagate from the front sill pad attachment welds into the shell and head in a low-energy (brittle) manner. 2.9 Tank car material properties The tank car head and shell material met the applicable requirements for chemical composition and tensile properties. Although not required for these cars, the material
Railway Investigation Report R15H0013 | 77
satisfied the AAR’s impact energy requirements for low-temperature service. In general terms, this means that the tank car material should have been more resistant to brittle fractures at low temperatures. However, some tank cars exhibited brittle fractures consistent with low-energy crack propagation, which led to a rapid release of product. With a temperature of −31 °C at the time of the accident, it is likely that the severity of the collisions, which produced a high strain rate and high degree of stress triaxiality at the fracture locations, combined with the low ambient temperature, contributed to the brittle tank fractures observed. Despite design enhancements, it would appear that the Class 111 CPC-1232 compliant tank cars involved in this occurrence did not perform much better than the legacy Class 111 tanks cars involved in the Lac-Mégantic accident. Although the CPC-1232 standard is an improvement over the legacy Class 111 tank cars, this standard does not seem to be sufficiently robust to ensure the safe transportation of Class 3 Packing Group I and Packing Group II products, when these tank cars are involved in high speed derailments. In this occurrence, the severity of the tank car impact and thermal damage, the subsequent release of product and post-derailment fire, as well as the damage to the environment, reinforce the ongoing TSB concern relating to trains carrying large volumes of flammable liquids. If flammable liquids continue to be transported in tank cars that are not sufficiently robust to prevent catastrophic failure when involved in an accident, the risk of DG release during a derailment will remain high. 2.10 New regulations for tank cars in flammable liquids service In May 2015, TC published in the Canada Gazette, Part II, amendments to the TDG Regulations. These amendments established requirements for a new flammable liquids tank car standard (TC-117), retrofit requirements for older tank cars in flammable liquids service, and implementation timelines to modernize the Canadian tank car fleet. TC is also updating standard TP14877, Containers for Transport of Dangerous Goods by Rail, December 2013, which is the Canadian standard referenced in the TDG Regulations concerning the construction of TC-117 tank cars. The standards and timelines were generally harmonized with the U.S. regulators, the Pipeline and Hazardous Materials Safety Administration and the Federal Railroad Administration. With the coming into force in the U.S. of the recent Fixing America’s Surface Transportation (FAST) Act, the U.S. has further harmonized with the Canadian requirements. The new regulations require that all new tank cars built for transporting flammable liquids be constructed using even thicker and more impact-resistant steel, and that they be equipped with jacketed thermal protection, full-height head shields, top fittings protection, improved bottom outlet valves, and appropriate pressure relief devices. The Railway Association of Canada (RAC) and industry continue to support improvement in tank car standards. However, transitioning to the new TC-117 and retrofitted tank cars with further enhanced protection, that are now required by regulation to transport a number of Class 3 flammable liquids by rail, will take some time. In light of a number of significant derailments that
78| Transportation Safety Board of Canada
resulted in the release of flammable liquids, loss of life and damage to the environment, if the new tank car standards are not fully implemented in a timely manner, there is a continued risk of product loss and associated consequences when tank cars carrying flammable liquids are involved in a derailment. In the meantime, as the industry works through the transition to the new TC-117 and retrofitted tank cars, risk control measures, such as speed reduction for key trains and risk assessments for key routes, need to be managed effectively. 2.11 Key train speed The occurrence train was hauling 100 Class 111 tank cars loaded with Class 3 flammable liquids. Each car was built in compliance with the CPC-1232 standard and had a GRL capacity of 286 000 pounds. Sixty-eight of the cars were loaded with petroleum crude oil (UN 1267) and 32 were loaded with petroleum distillates (UN 1268). The train was 6089 feet long and weighed 14 355 tons. The train was designated as a key train and was operating on a key route. At the time of the accident, the train was travelling at 38 mph. Kinetic energy is a function of mass times speed squared. During a derailment, a train loses kinetic energy as the energy is consumed by the forces involved in the derailment and as the train comes to a stop. A heavier train (e.g., a crude oil unit train) has greater momentum and requires more energy to slow down and more distance to stop, in comparison to a lighter train. It is well understood in the industry that when train speed is increased, more cars will derail when the train is involved in a derailment. While train speed is a primary factor in the severity of the outcome of a derailment, the weight of the cars involved also plays a role, as heavier cars will gain more momentum when train speed increases and will take more effort to stop. When heavier tank cars are loaded with DGs, the risk of a release and the potential consequences resulting from a derailment are also elevated. All of these factors were present in this accident. Given the circumstances in this occurrence, the speed of the petroleum crude oil unit train increased the severity of the outcome. Regulators have recognized the role that speed plays in the severity of outcomes during a derailment and have put measures in place to limit the speed of key trains under certain conditions. Following the Lac-Mégantic accident, on 23 April 2014, TC issued Ministerial Order (MO) 14-01, requiring railways to limit key train speed and perform risk assessments for key routes. The MO continued to be re-issued until February 2016, when the TC- approved Rules Respecting Key Trains and Key Routes came into force. The Rules Respecting Key Trains and Key Routes require railways to restrict key trains to a maximum speed of 50 mph, and further restrict key trains to a maximum speed of 40 mph within the core and secondary core of census metropolitan areas. The rules further require railways to restrict key trains transporting 1 or more DOT-111 loaded tank cars containing a number of Class 3 flammable liquids to a maximum speed of 40 mph in areas identified as higher risk through the risk assessment process that is also required by the rules. The DOT- 111 tank cars also include those that were constructed to the CPC-1232 specification, such as
Railway Investigation Report R15H0013 | 79
the cars transported by the occurrence train. Despite the speed restriction of 40 mph for a unit train hauling Class 3 flammable liquids, no detailed engineering analysis had been performed to assess the effect of the speed reduction on the severity of a derailment. The occurrence train was travelling at 38 mph at the time of the accident, which resulted in the derailment of 29 DG tank cars. Nineteen of the tank cars were breached, and about 1.7 million litres of product were released to either atmosphere or surface. The product ignited, and fires burned for 5 days. Although the accident occurred in a remote area and there were no injuries, the accident impacted the environment and required significant post- accident restoration work. As has been seen in the past, if the accident had occurred within a town, city, or metropolitan area, the outcome could have been even more severe. Because the accident occurred at 38 mph, the severity of its outcome suggests that a speed restriction of 40 mph, as outlined in TC’s MO in place at the time of the accident and in the current Rules Respecting Key Trains and Key Routes, is not sufficient for unit trains transporting Class 3 flammable liquids. General merchandise trains, which often transport DG tank cars dispersed throughout the train, are generally exposed to less risk in a derailment because the derailment may occur in an area of the train that either is not transporting DG tank cars or is transporting only a few of them. Unit trains of DG tank cars transporting Class 3 flammable liquids, meanwhile, have a different risk profile. When a derailment that occurs at or near track speed involves a unit train transporting Class 3 flammable liquids, the risk of release and adverse consequences is high no matter where the derailment occurs within the train, because all of the cars are carrying Class 3 flammable liquids. If train speed is not adequately restricted for unit trains transporting Class 3 flammable liquids, there is an increased risk of product release and adverse consequence when the train is involved in a derailment. 2.12 Canadian National Railway Company corridor risk assessment In Safety Issues Investigation SII R05-01, the TSB studied a series of occurrences and identified an imbalance between infrastructure maintenance and increases in the volume of bulk traffic. The study determined that, although railways recognize that the rate of track degradation was accelerated with increases in bulk unit train tonnage, an appropriate balance between increased track degradation and timely infrastructure maintenance or renewal was not always achieved. The study highlighted that compliance with the TSR alone was not sufficient to ensure safety, and emphasized the need for proactive SMS processes to anticipate operational conditions that could lead to a degradation of safety margins. The TSB Watchlist has also emphasized the need for SMS to be implemented effectively in order to ensure that hazards are proactively identified and that risks are maintained at an acceptable level. Between 2010 and 2014, rail traffic tonnage on the Ruel Subdivision increased by 44%. During that same period, the transport of petroleum crude oil by rail increased dramatically, accounting for 46% of the rail traffic tonnage increase. Much of the petroleum crude oil was being transported in bulk unit trains equipped with Class 111 tank cars that were built to the CPC-1232 standard and had a GRL capacity of 286 000 pounds. Although the track in the
80| Transportation Safety Board of Canada
vicinity of the derailment was continually maintained to Class 3 standards, the potential for more rapid degradation of track infrastructure due to a 44% increase in traffic tonnage, much of which was transported in heavier rail cars, was not immediately recognized. While CN’s SMS called for risk assessments in response to significant changes in business, including changes in traffic volumes or types of product, no definition of “significant change” was provided. The scope of CN’s risk assessment examined the hazards associated with the transportation of DGs between Winnipeg and Toronto, and identified the need for increased emergency response supplies on the Ruel Subdivision. However, CN did not anticipate the impact of the increased traffic and tonnage or the ability to maintain adequate track safety margins on the Ruel Subdivision. These increases did not prompt a proactive review of the April 2014 CN risk assessment. The risk assessment did not identify mitigation strategies to assist in meeting increased track maintenance demands resulting from increased traffic and tonnage or to assess the impacts of these demands. This left CN to manage the balance between increased traffic and maintenance activities through lagging indicators such as inspections, track testing, implementation of slow orders, incidents, and accidents. CN did not have a clear definition of what constituted a significant change in business, such as volumes and products transported, that would prompt a review of the risk assessment. Consequently, CN’s SMS relied on reactive indicators and did not anticipate the need for increased track maintenance in light of significant increases in DG volumes and traffic tonnage. Freight cars are typically equipped with 8 wheels (4 wheel set assemblies containing 2 wheels each). For a loaded freight car with a GRL capacity of 263 000 pounds, such as a legacy Class 111 tank car, each wheel will carry 32 875 pounds. In comparison, for a loaded tank car with a 286 000 pound GRL capacity, such as a Class 111 tank car built to the CPC-1232 standard, each wheel will carry 35 750 pounds (i.e., about 2875 pounds more per wheel than a car with 263 000 pound GRL capacity). To put this in perspective, the 286 000 pound GRL capacity tank cars of the occurrence train would impart about 1 150 000 pounds more weight on to the south rail (2875 pounds × 4 wheels × 100 cars) than a similar train transporting loaded tank cars with a GRL capacity of 263 000 pounds. The additional weight of cars with a GRL capacity of 286 000 pounds would also lead to more rapid deterioration of track infrastructure, due to the higher wheel impacts and greater deflection in areas where REB conditions or poorly supported joints are present. In this occurrence, all of these elements were present. If risk assessments do not adequately consider increases in traffic tonnage, the use of heavier rail cars and the potential for more rapidly degrading track structure, regular track maintenance activities may no longer be sufficient to maintain track to the required standards, increasing the risk of track infrastructure failures. 2.13 Regulatory oversight for the Ruel Subdivision In conjunction with its responsibilities of oversight for regulatory compliance, TC rail safety inspectors are tasked with conducting railway infrastructure inspections across Canada. Subdivisions are not subject to regular TC inspections. TC uses a risk-based approach that
Railway Investigation Report R15H0013 | 81
considers various factors to identify areas requiring targeted inspection. In this occurrence, a significant increase in overall tonnage and DG traffic did not result in the Ruel Subdivision being selected for more frequent targeted inspections, despite it being one of CN’s primary rail corridors. Before the accident, TC’s last visual track inspection in the vicinity of the derailment was conducted in 2012, and prior to that, in 2010. Between 2012 and 2014, rail traffic tonnage on the subdivision increased by 28%. During that same time, the transport of petroleum crude oil by rail increased dramatically and accounted for 48% of the rail traffic tonnage increase. Since 2012, TC had not performed any track inspections on the Ruel Subdivision until after the accident. In mid-March 2015, TC inspected the entire subdivision, and identified a total of 67 non-compliant conditions that required repair as well as 59 other concerns and observations. Maintenance programs must be implemented in a timely manner to ensure that risks are adequately mitigated. Regulatory inspections are equally important to ensure compliance. While the Railway Safety Management System Regulations call for companies to perform risk assessments in response to significant changes in business (volumes or product), the same changes in business do not necessarily prompt a TC review of subdivision condition or the need for additional regulatory inspections. If TC’s risk-based approach for identifying targeted regulatory inspections does not consider all relevant operational factors, such as increases in rail traffic tonnage and the DG volumes transported on primary rail corridors, the targeted track inspections may not be well focused, increasing the risk that degrading track conditions will go undetected by the regulator. 2.14 Emergency response The accident occurred in a remote location. The site was initially accessible only by rail (using a locomotive or hi-rail vehicle), which hindered access and mitigation activities. Access improved once CN cut a road into the site, providing access to vehicle traffic. The remoteness of the location, extreme cold, and severe winter conditions presented significant challenges to responders throughout the emergency response and site mitigation activities. Site access control 2.14.1 CN initially attempted to establish site access control with a formal sign-in/sign-out protocol. However, the process was not consistently adhered to, partly due to the remoteness of the location and the difficulty with entering and exiting the site. The process improved after roadway access to the site was established, but there was still no accurate record of who was physically on or off site. It could be argued that, due to the limited site access, the use of a sign-in/sign-out protocol was not absolutely necessary, as only authorized personnel would be accessing the site. However, the primary reason for having a site sign-in/sign-out protocol is to keep accurate records of who is physically on site, so that everyone can be accounted for in the event of an emergency evacuation. For this reason, it may be even more important to maintain an accurate sign-in/sign-out protocol when working in a remote location. If accurate sign-in/sign-out records are not maintained for accident sites involving
82| Transportation Safety Board of Canada
DGs, incident command may not be aware of all personnel on site, increasing the risk that all personnel will not be accounted for in the event of an emergency evacuation. Safety management system and Canadian National Railway Company incident 2.14.2 command documentation TC SMS Regulations require a company to have: • systems for accident and incident reporting, investigation, analysis and corrective action; • systems for ensuring that employees and any other persons to whom the railway company grants access to its property, have appropriate skills and training and adequate supervision to ensure that they comply with all safety requirements; and • procedures for the collection and analysis of data for assessing the safety performance of the railway company. In this occurrence, CN was the primary response agency and implemented its incident command system. The CN Senior Vice-President, Eastern Operations, acted as the incident commander, supported by the Assistant Vice-President Safety and Emergency Response and CN DGOs as well as other CN staff and contractors. CN protocols required that a detailed emergency response incident command logbook be maintained. CN guidance requires that the logbook be completed and that all meetings be documented by CN risk management personnel. Once CN established the incident command, the focus quickly turned to constructing road access to the site and mobilizing response personnel and resources to help minimize environmental damage, control the pool fires, and begin track restoration. All associated activities would normally be documented in the logbook. However, in this case, there were no entries. In accordance with the SMS Regulations, CN had developed and implemented a detailed SMS. Since 2008, CN’s SMS had been enhanced each year and had been integrated into most facets of its operations. In parallel with implementing SMS, CN recognized the importance of building an effective safety culture and had made strides in that area. An effective SMS ensures that activities are documented so that a company can identify successes as well as gaps in processes that need to be improved to enhance safety. Despite its SMS, CN did not follow its own guidance, as there were no entries recorded in its logbook. The absence of documentation for CN emergency response activities highlights a gap in reporting and/or procedures within CN’s SMS. Site monitoring and respiratory protection 2.14.3 Dense smoke swirled throughout the area as the product continued to burn and site mitigation activities progressed. While DG protocols require responders to approach a DG site from an upwind position, there was no wind monitoring device in place. If wind direction is not monitored and planned activities are not modified to correspond with
Railway Investigation Report R15H0013 | 83
changes in wind direction, emergency responders may be subjected to unnecessary DG exposure, increasing the risk of injuries to the responders. Initially, many employees did not wear dust masks or respirators to protect against airborne particulates from the fire or vapours from volatile organic compounds (VOC) in the product (e.g., benzene). Due to the nature of the released product, the site was monitored for VOC lower explosive limit and hydrogen sulfide. In addition, the site was monitored for benzene levels every 30 minutes to ensure that they were within the established short-term exposure limit of 5 parts per million (ppm) as averaged over a 15-minute period. However, because the benzene-specific monitoring was only valid for the precise location at which it was recorded, the cumulative effect of repeated exposures throughout the site could not be determined accurately. CN employees were not provided with cartridge-type respirators to protect against benzene vapours. Many of the on-site personnel worked without wearing dust masks to protect against particulates, and any exposed skin (including the mouth and nose areas) was covered in soot by the end of a shift. Although CN provided dust masks later in the response, the use of half- or full-face cartridge-type respirators to protect against particulates and benzene would have provided superior respiratory protection. If adequate respiratory protection is not provided to personnel on a DG accident site, exposure to airborne particulates and chemicals may occur, increasing the risk of cumulative adverse long-term health effects. 2.15 Environmental impact A surface water sampling program was initiated in the vicinity of the derailment, which included the channel leading toward Upper Kasasway Lake and several locations within Upper Kasasway Lake. Mobile wastewater treatment units were sent to the site to treat all recovered impacted water. The treated water was then safely discharged back into the natural environment. Following consecutive rounds of sampling with no impacts found, sampling frequency was reduced to twice per week until the winter of 2015. A total of 17 groundwater monitoring wells were installed to verify the direction of groundwater flow and groundwater depth, and to determine whether the groundwater was affected. Site monitoring was completed for the winter by November 2015. By that time, no crude oil was detected in the groundwater. As of 01 July 2016, no negative environmental impact to the surface or groundwater was present. Going forward, surface water and groundwater will continue to be monitored quarterly for an indefinite period of time. A significant volume of soil was removed from the derailment site by truck. In the spring of 2016, the Ontario Ministry of Environment and Climate Change designated the soil as non- hazardous waste, and all excavated soil was removed from the accident site and transported by truck to approved landfill sites. Forest restoration, which included a planting program to return the vegetation species that were native to the area, was completed in the spring of 2016 with the assistance of the local Mattagami First Nation. The environmental plan was comprehensive, and it would appear that appropriate mitigating strategies were put in place for site restoration.
84| Transportation Safety Board of Canada
- 0 Findings
- 1
Findings as to causes and contributing factors 1. The derailment occurred when the insulated rail joint in the south rail at Mile 111.7 failed beneath the head-end of the train and allowed the trailing L4 wheel of the 8th car to drop into gauge, which spread the rails and caused the trailing cars to derail. 2. The failure of the insulated joint bars was caused by the overstress (brittle) extension of corrosion-initiated reverse bending fatigue cracks, which initiated at the upper mating surface between the top of the joint bars and the underside of the rail head. 3. The cold temperature at the time of the occurrence made the joint bar material more susceptible to brittle failure. Once the joint bar fatigue cracks reached a critical size, the bars could no longer sustain service loads, and subsequently failed. 4. Since the joint bar fatigue cracks extended to the outer surface of each joint bar just under the rail head, the cracks had likely been visible for some period of time prior to failure, yet were undetected despite numerous inspections by the Canadian National Railway Company. 5. The assistant track supervisor lacked sufficient experience to recognize the 1-inch low spot as being indicative of degrading joint support, the effect of repeated wheel impacts on the degrading joint support, and the need to closely inspect the joint bars for cracks when monitoring the rail end batter condition. 6. Training for Canadian National Railway Company assistant track supervisors (ATSs) related to rail end batter, joint bar fatigue, bolt hole cracking and joint assembly failure was insufficient to enable the ATS to understand the relationship between an unsupported joint and the development of joint defects. 7. The Canadian National Railway Company’s assistant track supervisor (ATS) training program provided little mentoring or support to ATS candidates during the on-the- job field portion of their training to assist in developing the competencies required to be effective in a highly demanding and challenging safety-critical position. 8. Of the 29 derailed tank cars, 8 sustained medium to large shell breaches during the derailment, immediately releasing their lading, which ignited and resulted in a large pool fire. 9. The absence of tank-car thermal protection likely increased the severity of the product release and further fueled the fire, as 7 tank cars sustained thermal tears after exposure to the pool fire. 10. The tank car bottom outlet valve handle design was inadequate to protect against product release during the derailment, and contributed to the severity of the release.
Railway Investigation Report R15H0013 | 85
The large quantities of spilled product, the rapid rate of release of the product, as well as the product’s high volatility and low viscosity contributed to the ignition of large post-derailment fires and the pool fire.
It is likely that the severity of the collisions, which produced a high strain rate and high degree of stress triaxiality at the fracture locations, combined with the low ambient temperature, contributed to the brittle tank fractures observed.
Given the circumstances in this occurrence, the speed of the train increased the severity of the outcome.
Since the accident occurred at 38 mph, the severity of its outcome suggests that a speed restriction of 40 mph, as outlined in Transport Canada’s ministerial order in place at the time of the accident and in the current Rules Respecting Key Trains and Key Routes, is not sufficient for unit trains transporting Class 3 flammable liquids. 3.2 Findings as to risk
If the training program does not reference key remedial measures for maintaining rail joints, new track engineering personnel may not fully understand the available mitigation strategies, increasing the risk that track conditions will not be addressed in an effective and timely manner.
If company standards for monitoring rail end batter (REB) conditions do not include guidance to inspect joint bars for cracks at the same time the REB is measured, joint bar cracks may not be detected in a timely manner, increasing the risk of rail joint failures.
If assistant track supervisor (ATS) candidates do not receive adequate mentoring and support during the on-the-job portion of their training, there is an increased risk that ATSs will lack the necessary expertise in this safety-critical position, despite completing the ATS training program.
If bottom outlet valve handles continue to be exposed without adequate protection, there is an increased risk of product release in the event of a derailment and during subsequent site remediation.
If the placards displayed on a tank car do not match the shipping information, emergency responders will not be fully aware of the tank car contents and may unknowingly place themselves in a vulnerable situation, increasing the risk of injuries.
If flammable liquids continue to be transported in tank cars that are not sufficiently robust to prevent catastrophic failure when involved in an accident, the risk of release of dangerous goods during a derailment will remain high.
86| Transportation Safety Board of Canada
If the new tank car standards are not fully implemented in a timely manner, there is a continued risk of product loss and associated consequences when tank cars carrying flammable liquids are involved in a derailment.
If train speed is not adequately restricted for unit trains transporting Class 3 flammable liquids, there is an increased risk of product release and adverse consequence when the train is involved in a derailment.
If risk assessments do not adequately consider increases in traffic tonnage, the use of heavier rail cars and the potential for more rapidly degrading track structure, regular track maintenance activities may no longer be sufficient to maintain track to the required standards, increasing the risk of track infrastructure failures.
If Transport Canada’s risk-based approach for identifying targeted regulatory inspections does not consider all relevant operational factors, such as increases in rail traffic tonnage and the volumes of dangerous goods transported on primary rail corridors, the targeted track inspections may not be well focused, increasing the risk that degrading track conditions will go undetected by the regulator.
If accurate sign-in/sign-out records are not maintained for accident sites involving dangerous goods, incident command may not be aware of all personnel on site, increasing the risk that all personnel will not be accounted for in the event of an emergency evacuation.
If wind direction is not monitored and planned activities are not modified to correspond with changes in wind direction, emergency responders may be subjected to unnecessary exposure to dangerous goods, increasing the risk of injuries to the responders.
If adequate respiratory protection is not provided to personnel on the site of an accident involving dangerous goods, exposure to airborne particulates and chemicals may occur, increasing the risk of cumulative adverse long-term health effects. 3.3 Other findings
While new technology for inspecting joint bars appears promising, unlike geometry inspection and rail flaw testing, the use of high-speed cameras and ultrasonic testing to inspect joint bars is not required by regulation, and is not yet widespread throughout the industry.
Although the 15th and 18th tank cars were jacketed, insulated and exposed to the pool fire, the cars had sustained other breaches. Since these other breaches likely released internal pressure, the effect that the jacket and insulation had in delaying the internal build-up of pressure could not be determined.
Railway Investigation Report R15H0013 | 87
For the 7 tank cars that exhibited thermal tears, there was no evidence to support the hypothesis that pressure relief devices with higher start-to-discharge pressure result in more energetic (larger size) thermal tears.
In this occurrence, the trapezoidal half-head shields and full-height head shields fitted on the CPC-1232 compliant tank cars were generally effective in protecting the heads against impact punctures during the derailment.
The small number of tank cars with breached manways, top fittings and pressure relief devices suggests that the features incorporated for top mounted appurtenances were generally effective in reducing the release of product.
The severity of the multidirectional impacts sustained by the A-end of the 28th tank car had likely exceeded the stub sill design criteria and caused the cracks to propagate from the front sill pad attachment welds into the shell and head in a low energy (brittle) manner.
The Canadian National Railway Company’s safety management system relied on reactive indicators, and did not anticipate the need for increased track maintenance in light of significant increases in volumes of dangerous goods and traffic tonnage.
The absence of documentation for Canadian National Railway Company’s (CN’s) emergency response activities highlights a gap in reporting and/or procedures within CN’s safety management system.
The environmental plan was comprehensive, and it would appear that appropriate mitigating strategies were put in place for site restoration.
88| Transportation Safety Board of Canada
- 0 Safety action
- 1
Safety action taken Transportation Safety Board of Canada 4.1.1 On 17 March 2015, the Transportation Safety Board of Canada (TSB) issued rail safety advisory (RSA) letter 04/15 regarding the condition of track infrastructure on Canadian National Railway Company’s (CN’s) Ruel Subdivision. The RSA suggested that, given the potential damage and consequences of a train derailment, particularly when petroleum crude oil unit trains are involved, Transport Canada (TC) should review the risk assessments conducted for the Ruel Subdivision, assess the track infrastructure condition, and determine whether additional risk control measures are required when operating a ”key train” on this “key route.” Transport Canada 4.1.2 TC took the following action: On 12 March 2015, TC issued a Notice to CN, as per the requirements of Section 31 of the Railway Safety Act, raising concerns about the track condition on the Ruel Subdivision. With respect to the track infrastructure, pursuant to a third derailment, TC’s Ontario Regional Office requested track inspection records from CN, and also inspected the entire Ruel Subdivision between 15 March and 19 March 2015. A report summarizing the inspection findings was provided to CN. The TC inspection noted a total of 67 non-compliant conditions that required repair, as well as 59 other concerns and observations. On 30 March 2015, CN responded to TC’s Notice, with a description of the action plan the company implemented. The plan included operating at a reduced speed on the subdivision, performing supplementary inspections, and having additional analysis undertaken by experts outside the company on the possibility of distributed power reducing derailment severity, and conducting a review of train-track forces associated with unit trains of crude oil. On 07 May 2015, TC sent a Letter for Insufficient Action Taken to CN stating that after the review and evaluation of the corrective measures outlined in the 30 March 2015 correspondence, TC was not satisfied that the action taken had addressed the hazard or condition posing the threat to safe railway operations. TC requested updates and additional information on CN’s findings and plans with respect to the recent derailments. On 21 May 2015, CN responded to TC’s Letter for Insufficient Action Taken, providing the requested information, in particular: the results of work that CN undertook to determine the root causes of the derailments, the conclusions from the analysis of distributed power benefits, measures taken to address turnout maintenance concerns, and CN’s analysis of adequacy of track time provided to employees for maintenance and inspection activities on
Railway Investigation Report R15H0013 | 89
the Ruel Subdivision. CN also included the status of risk mitigation actions and additional actions and results of associated analyses. On 22 May 2015, CN advised TC that the temporary speed restriction of 35 mph across the Redditt, Allanwater, Carmat, and Ruel Subdivisions (i.e., the Winnipeg to Capreol rail corridor) put in place immediately after the derailments would be lifted on 23 May 2015. CN indicated that the restriction was no longer required due to the measures taken within the first 60 days of the derailment. On 02 June 2015, TC sent a letter to CN, indicating that TC officials would meet with CN officials to inspect the Ruel Subdivision and review the implementation, effectiveness, and adequacy of CN’s response to the Letter for Insufficient Action Taken. Canadian National Railway Company 4.1.3 CN used this occurrence as a lessons-learned opportunity and strengthened its data collection processes. Shortly after this derailment, CN experienced 2 other significant track-related derailments on the Ruel Subdivision. Subsequent to the third derailment, which occurred on 07 March 2015, CN immediately implemented the following measures: Operating restrictions • A 35 mph temporary (60-day) speed restriction for key trains operating between Winnipeg and Capreol was introduced and subsequently lifted. • Although train speed through a census metropolitan area (CMA)101 is restricted to 40 mph by regulation, CN has further restricted Key Trains to 35 mph through a CMA. Mechanical actions • Qualified mechanical personnel performed roll-by inspections of loaded crude oil trains at Hornepayne, Ontario, for 60 days following the occurrence. Engineering actions • The frequency of rail flaw ultrasonic track testing for the Ruel Subdivision was increased to once every 14 days from the previous winter interval of 20 days. A subsequent review of the test results indicated that the Ruel Subdivision had similar defect volume per mile tested ratios as compared with other Winnipeg-to-Toronto corridor subdivisions. Consequently, the testing interval later reverted back to 20 days. • CN and Sperry Rail Service carried out a review of rail flaw detector (RFD) tapes for those inspections performed immediately following the derailment. Thirty-seven
101 A Census Metropolitan Area (CMA), as defined by Statistics Canada, is an area of one or more neighbouring municipalities situated around a core. A CMA must have a total population of at least 100 000, of which 50 000 or more live in the core. A census agglomeration [secondary core] must have a population of at least 10 000.
90| Transportation Safety Board of Canada
tape-indicated locations from several RFD tapes were hand tested. The results indicated that the RFD equipment was performing as expected. • Localized surface collapse (LSC) and rail end batter (REB) criteria contained in CN Engineering Track Standards TS 1.7 (10a) and (10b) were superseded by the more restrictive CN Amalgamated Ruel Subdivision Action Plan dated 12 March 2015. • Additional off-territory management was mobilized to the Northern Ontario Zone to review the territory and evaluate areas of opportunity for enhancing the skillsets of track personnel that perform inspections. • Investment in rail, ties and surfacing was increased in 2015 from $10 million to $20 million. Capital track maintenance work programs began throughout the spring and summer of 2015. Two complete mainline turnouts were installed. Seventeen mainline switch points and stock rails, and 27 mainline frogs were changed out. Approximately 44 miles of new rail was laid and 216 miles of track was re-surfaced. Approximately 30 miles of track was re-gauged with wood plugs or concrete insulators, 773 butt welds were installed to eliminate joints, and about 37 000 concrete or wood ties were installed. CN modified its track inspection guidelines (TIG) course to include conditions that could contribute to REB and conditions that could result from REB. In 2015, CN updated its Network Operations emergency response plan (ERP), incident command logbook and supervisor job aid, including electronic forms of command documentation. All CN Transportation, Engineering, Mechanical and Risk Management managers (up to vice-president) were required to complete the CN Railroad Emergency Response (RER) course, ERP training and incident command structure (ICS) 100 training. Support functions such as the CN Environmental Department and CN Police also participated in similar training. Risk management officers in Canada and safety officers in the United States completed training in site safety and on the completion of the incident command logbook documentation. In late 2016, CN implemented quarterly evaluations and conference calls for all assistant track supervisor (ATS) candidates. The conference calls will be extended to all future ATS classes. The January 2017 ATS class will have a first formal review and conference call during the second quarter of 2017. CN established permanent internal mentors with 1 permanent mentor per region. Senior engineering managers now work with regional chiefs to be available for mentoring in the field. Mentors use a checklist for each supervisor and inspector they spend time with and provide the employee as well as the regional management team with a full report. Regional managers will follow up on areas of concern and development required with the employees. The majority of the time is spent in the field in the new supervisor’s territory, focusing on the following activities: • quality inspection; • applying Engineering Track Standards;
Railway Investigation Report R15H0013 | 91
• arranging for repairs; and • follow-up on completion and sign-off. Subsequent to the occurrence, CN purchased 2 hi-rail vehicles in 2015 that are capable of performing electronic joint bar inspections. These vehicles are focused on inspections in Canada. CN also worked with Sperry Rail Service to implement joint bar inspections on specific trucks that work across Canada. CN modified its ATS program to include an “Advanced Track Inspection” course. The course is specifically designed to provide engineering management detailed knowledge on defect development and analytical tools. The course includes the following topics: • Rail metallurgy, defect causes and failure mechanisms; • Bolted vs all-welded turnout geometry and its impact on in-track speed and dynamic forces; • Types of lubrication strategies and their impact on wear and track forces; • Proper interpretation of TEST car graphs in identifying defects and potential problem areas; and • Use of CN analytical systems to proactively identify problem areas and identify defect trends.
92| Transportation Safety Board of Canada
- 2
Safety concern Speed of unit trains transporting Class 3 flammable liquids 4.2.1 Kinetic energy is a function of mass times speed squared. When a derailment occurs, a train loses kinetic energy as the energy is consumed by the forces involved in the derailment and as the train comes to a stop. A heavier train (e.g., crude oil unit train made up of tank cars with a capacity of 286 000 GRL, or gross rail load) has greater momentum, must dissipate more energy to slow down, and requires a greater distance to stop, in comparison to a lighter train. In addition, derailments that occur near the front of a train may derail more cars as the weight of the following cars may affect the derailment dynamics.102 It is well understood in the industry that, when a train derails, the number of derailed cars and the severity of the outcome will increase as the speed of the train increases. It is also understood that the severity of a derailment varies by accident cause, with broken rails generally causing more cars to derail in comparison to other accident causes.103 Recent examples of unit trains of Class 3 flammable liquids derailing as a result of track failure include: • In the Lynchburg, Virginia accident, eastbound CSX Transportation (CSXT) unit train K08227 was transporting 104 Class 111 tank cars loaded with petroleum crude oil (UN 1267) when 17 of the cars derailed. The train was 6426 feet long, weighed 14 107 tons and was traveling at 24 mph at the time of the accident. One of the cars was breached and released about 29 868 U.S. gallons (113 000 litres) of petroleum crude oil into the river, some of which caught fire. • In the Mount Carbon, West Virginia accident, eastbound CSXT unit train K08014 was transporting 107 Class 111 tank cars loaded with petroleum crude oil when 27 of the cars derailed. The train was 6721 feet long, weighed 15 261 tons and was traveling at 33 mph at the time of the accident. Of the 27 tank cars that derailed, 19 cars were involved in a pileup and a post-derailment pool fire. Two tank cars were punctured during the derailment and released product, 4 other cars released product from either top or bottom fittings. The pool fire caused thermal tank shell failures on 13 tank cars that had initially survived the accident. A total of approximately 378 000 U.S. gallons (1.43 million litres) of product was released. • In this occurrence, eastbound CN unit train U70451-10 was transporting 100 Class 111 tank cars when 29 of the cars derailed. Sixty-eight cars were loaded with petroleum crude oil (UN 1267) and 32 were loaded with petroleum distillates (UN 1268). The train was 6089 feet long, weighed 14 355 tons and was traveling at 38 mph at the time of the accident. Nineteen cars were breached, and about 1.7 million litres of product were released.
102 Xiang Liu, Mohd Rapik Saat and Christopher P.L. Barkan, “Probability analysis of multiple-tank- car release in railway hazardous materials transportation,” Journal of Hazardous Materials, Volume 276 (15 July 2014), pp. 442–451. 103 Ibid.
Railway Investigation Report R15H0013 | 93
While train speed is a primary factor in the severity of the outcome of a derailment, the weight of the cars involved also plays a role, as heavier cars will gain momentum when speed increases and will take more effort to stop. When heavier tank cars are loaded with dangerous goods (DG), the risk of a release and the potential consequences resulting from a derailment are also elevated. Given the circumstances in this occurrence, the speed of the petroleum crude oil unit train increased the severity of the outcome. On 23 April 2014, following the Lac-Mégantic accident, TC issued Ministerial Order (MO) 14- 01 requiring railways to limit key train104 speed and perform risk assessments for key routes. The MO continued to be re-issued until February 2016, when the TC-approved Rules Respecting Key Trains and Key Routes came into force. The rules require railways to restrict key trains to a maximum speed of 50 mph, and further restrict key trains to a maximum speed of 40 mph within the core and secondary core of CMAs. The occurrence train was travelling at 38 mph at the time of the accident. Of the 29 derailed DG tank cars, 19 were breached and about 1.7 million litres of product were released to either atmosphere or surface. The product ignited, and fires burned for 5 days. Although the derailment occurred in a remote area and there were no injuries, the accident impacted the environment and required significant post-accident restoration work. Had the accident occurred within a village, town, or CMA, the outcome could have been more severe. The derailment occurred at a speed that was less than the 40 mph speed restriction required by TC’s ministerial order in place at the time of the accident and by the current Rules Respecting Key Trains and Key Routes. Given the severity of the outcome in this and other occurrences, the Board is concerned that a speed restriction of 40 mph may not be sufficient for some key trains, particularly unit trains transporting Class 3 flammable liquids in tank cars that do not meet the TC-117 standard.
104 The term “key train” is defined as “an engine with cars
a) that includes 1 or more loaded tank cars of dangerous goods that are included in Class 2.3, Toxic Gases and of dangerous goods that are toxic by inhalation subject to Special Provision 23 of the Transportation of Dangerous Goods Regulations; or
b) that includes 20 or more loaded tank cars or loaded intermodal portable tanks containing dangerous goods, as defined in the Transportation of Dangerous Goods Act, 1992 or any combination thereof that includes 20 or more loaded tank cars and loaded intermodal portable tanks.” (Transport Canada, Rules Respecting Key Trains and Key Routes, Section 3.4)
94| Transportation Safety Board of Canada
- 3
Safety action required Validation of maximum speed for trains transporting dangerous goods 4.3.1 The severity of the outcome in any derailment is directly related to train speed and other factors. One of the ways that the rail industry manages the risk of derailment is through the reduction of train speed. Train speed is restricted based on the class and the condition of the track. When additional track maintenance is required on the track, slow orders can be implemented to further restrict train speed. This is a regular practice in the industry. While train speed contributes to the severity of outcome in any derailment, other factors also play a role including train length, the cause of the derailment, the position of the first car(s) derailed, the position of the tank cars in the train and tank car safety design.105 Although managing train speed based on the condition of the track will help minimize the severity of outcome in the event of a derailment, the risk profile of each train should also be considered. For example: • “Non-key” mixed merchandise trains which transport few or no DGs and unit trains transporting non-DG commodities (i.e., grain, potash, coal) have the lowest risk profile. • “Key” mixed merchandise trains transporting the minimum number of DG tank cars which are dispersed throughout the train are exposed to less risk in a derailment since the derailment could occur in an area of the train that is either not transporting DG tank cars or is only transporting a few. • Similarly, “Key” mixed merchandise trains which transport larger blocks of DG tank cars are exposed to more risk in the event of a derailment. • “Key” unit trains of DG tank cars transporting Class 3 flammable liquids have the highest risk profile. When a derailment occurs that involves a unit train transporting Class 3 flammable liquids, the risk of release and adverse consequence is high no matter where the derailment occurs within the train, because all cars are carrying Class 3 flammable liquids. To some extent, TC has recognized the role that train speed and train risk profile plays in severity of the outcome of a derailment, and has put some measures in place to limit the speed of “key trains” under certain conditions. The TC-approved Rules Respecting Key Trains and Key Routes restrict “key trains” to a maximum speed of 40 mph within the core and secondary core of CMAs. Although the restrictions contained in the rules were a step forward at the time issued, the current maximum speed of 40 mph was selected without being validated by any engineering analysis. Furthermore, the fact that the new tank car standards (TC-117) will not be fully implemented before 2025 means that less robust tank cars, such as those involved in this occurrence, will
105 Xiang Liu, Mohd Rapik Saat and Christopher P.L. Barkan, “Probability analysis of multiple-tank- car release in railway hazardous materials transportation,” Journal of Hazardous Materials, Volume 276 (15 July 2014), pp. 442–451.
Railway Investigation Report R15H0013 | 95
continue to transport Class 3 flammable liquids. In its reassessment of TC’s response to Recommendation R14-01, the Board stated that, until flammable liquids are transported in tank cars built sufficiently robust to prevent catastrophic failure when involved in an accident, the risk will remain high. Therefore, the Board called upon TC and industry to ensure that risk control measures during the transition are effectively managed. As outlined in section 4.2.1, the Board is concerned that the associated train speed and residual risk may be too high for some “key trains.” Therefore, the Board recommends that: The Department of Transport conduct a study on the factors that increase the severity of the outcomes for derailments involving dangerous goods, identify appropriate mitigating strategies including train speeds for various train risk profiles and amend the Rules Respecting Key Trains and Key Routes accordingly. TSB Recommendation R17-01 This report concludes the Transportation Safety Board’s investigation into this occurrence. The Board authorized the release of this report on 23 January 2017. It was officially released on 16 February 2017. Visit the Transportation Safety Board’s website (www.tsb.gc.ca) for information about the TSB and its products and services. You will also find the Watchlist, which identifies the transportation safety issues that pose the greatest risk to Canadians. In each case, the TSB has found that actions taken to date are inadequate, and that industry and regulators need to take additional concrete measures to eliminate the risks.
96| Transportation Safety Board of Canada
Appendices Appendix A – Weather data from 14 February to 21 February 2015 Date Time High/ low Temp. (°C) Wind dir. (x 10=deg) Wind speed (km/h) Visibility (km) Weather 14 Feb 2015 0001 High −17 12 13 3.2 Snow 2300 Low −31 33 22 19 Ice crystals 15 Feb 2015 0800 Low −36 30 9 24 Ice crystals 1600 High −22 27 12 24 Clear 16 Feb 2015 0200 Low −37 18 4 24 Clear 1600 High −14 18 18 24 Clear 17 Feb 2015 1400 High −13 36 2 5 Snow 2300 Low −21 35 13 24 Snow 18 Feb 2015 0800 Low −27 33 10 24 Clear 1500 High −20 35 18 16 Cloudy 19 Feb 2015 0700 Low −36 30 11 24 Ice crystals 1600 High −23 32 20 16 Ice crystals 20 Feb 2015 0500 Low −39 18 6 24 Ice crystals 2100 High −15 20 16 8 Snow 21 Feb 2015 1400 High −8 23 15 16 Snow 2300 Low −19 33 18 13 Blowing snow
Railway Investigation Report R15H0013 | 97
Appendix B – Canadian National Railway Company Engineering Notice No. 2015-E-01, Regional Chief Engineering to All Engineering Employees Eastern Region (15 January 2015) Canadian National Eastern Region- Engineering NOTICE NO: 2015-E-01 DATE: January 15, 2015 Subject: Crushed Heads, Rail Joints, Insulated Glued Joints. To: All Engineering Employees in Eastern Region. EFFECTIVE IMMEDIATELY – EASTERN CANADA, on all Class 5 Track, Toronto to Winnipeg Corridor, Drummondville, Montmagny, Pelletier and Napadogan subs, The following will apply to the Eastern Region and will supplement the Track Standards. This will also apply to crushed heads, rail joints including insulated glued joints. • Within the next 96 hours all crushed heads and rail joints that are suspected to be over 3mm will be re-measured for crush and rail batter depth. On all joints a cross-level measurements taken to ensure a profile or warp situation is not evident. These lists (crushed heads, rail end batter with profile) are to be sent to each of the Asst Chiefs and myself by Tuesday January 20 at noon. If a profile or warp condition is found to be close to urgent conditions, the condition must be protected as per track standards. • If a crushed head or rail joint end batter is found to be > 4mm it will have to be changed out within 48 hours. If this cannot be done it will require a 40 mph TSO to be placed immediately until it is changed out. • If a crushed head or rail joint end batter is found to be >= 5mm it will require a 30mph (slow order) as per the track standards, however we will have only 48 hours to change this out with no exceptions. • Crushed heads and joints that are over 3.5 mm batter will be measured twice a week. **Under no circumstances will we compromise Safety and the integrity of our track, however all attempts must be made to remove rail and/or geometry conditions prior to putting on a TS0 (Temporary Slow Order). SME’s, make sure this gets the widest distribution and communication amongst the track people. This Eastern Region Policy will be in effect until cancelled by the Regional Chief Eastern Region. [Original Signed Regional Chief Engineering Eastern Region]
98| Transportation Safety Board of Canada
Appendix C – National Transportation Safety Board reports involving crude oil trains National Transportation Safety Board railroad accident brief relating to CSX Transportation Petroleum Crude Oil Train Derailment and Hazardous Materials Release at Lynchburg, Virginia106 On 30 April 2014, eastbound CSX Transportation (CSXT) petroleum crude oil unit train K08227 derailed 17 Class 111 tank cars at Mile 146.45 on main track 2 of the CSXT James River Subdivision in Lynchburg, Virginia, as a result of a defective rail. The train consisted of 2 locomotives, 1 buffer car, and 104 tank cars loaded with petroleum crude oil. It was 6426 feet long and weighed 14 107 tons. Due to track curvature in the area, a permanent maximum authorized speed limit of 25 mph was in place. The train was traveling at 24 mph at the time of the accident. Three of the derailed cars were partially submerged in the James River. One was breached and released about 29 868 gallons of crude oil into the river, some of which caught fire. No injuries to the public or crew were reported. At the time of the accident, it was cloudy and raining lightly; the temperature was 53 °F. National Transportation Safety Board factual report relating to CSX Transportation derailment at Mount Carbon, West Virginia107 On 16 February 2015, eastbound CSXT petroleum crude oil unit train K08014 derailed 27 loaded tank cars in Mount Carbon, West Virginia, as a result of a broken rail. The train consisted of 2 locomotives followed by a buffer car, 107 tank cars, and a tail end buffer car. The train was 6721 feet long and weighed 15 261 tons. The train was transporting about 3.1 million gallons of Bakken petroleum crude oil (UN1267, Class 3, Packing Group I) from Manitou, North Dakota, and was destined for Yorktown, Virginia. At the time of the accident, CSXT had implemented a temporary 40 mph speed restriction on the territory due to cold weather. The train was proceeding at 33 mph at the time of the accident. The temperature was 15 °F and there was 8 inches of recent snow. Of the 27 tank cars that derailed, 19 cars were involved in a pileup and a post-derailment pool fire. Two tank cars were punctured during the derailment and released product, 4 other cars released product from either top or bottom fittings. The pool fire caused thermal tank shell failures on 13 tank cars that had initially survived the accident. A total of approximately 378 000 U.S. gallons (1.43 million litres) of product was released. All tank cars involved in this accident were specification DOT-111A100W1 built to the Association of American Railroads (AAR) CPC-1232 industry standard. At the time of this
106 United States National Transportation Safety Board, Railroad Accident Brief NTSB/RAB/16-01, Accident No. DCA14FR008, CSXT Petroleum Crude Oil Train Derailment and Hazardous Materials Release. 107 National Transportation Safety Board, Tank Car Performance Factual Report (08 July 2015).
Railway Investigation Report R15H0013 | 99
accident, neither the DOT-111 tank cars nor those manufactured to the AAR CPC-1232 standard were required to be equipped with thermal protection systems to protect the tank from exposure to pool or torch fire conditions that can occur in accidents.108 None of the tank cars had thermal protection. During the derailment sequence, 2 tank cars were punctured, and released more than 50 000 gallons of crude oil. Of the 27 tank cars that derailed, 19 cars were involved in a pileup and the post-derailment pool fire. The pool fire caused thermal tank shell failures on 13 tank cars that had initially survived the accident. Only 1 tank car at the edge of the pool fire survived without release. The other 8 derailed tank cars, which were positioned on either side of the pool fire, were not significantly damaged and did not release product. On 12 April 2015, the National Transportation Safety Board issued to the Pipeline and Hazardous Materials Safety Administration 4 urgent safety recommendations that address the retrofitting of thermal protection systems for DOT-111 tank cars used to transport Class 3 flammable liquids. The recommendations included: Require that all new and existing tank cars used to transport all Class 3 flammable liquids be equipped with thermal protection systems that meet or exceed the thermal performance standards outlined in Title 49 Code of Federal Regulations 179.18(a) and are appropriately qualified for the tank car configuration and the commodity transported.109 In conjunction with thermal protection systems called for in safety recommendation R-15-14, require that all new and existing tank cars used to transport all Class 3 flammable liquids be equipped with appropriately sized pressure relief devices that allow the release of pressure under fire conditions to ensure thermal performance that meets or exceeds the requirements of Title 49 Code of Federal Regulations 179.18(a), and that minimizes the likelihood of energetic thermal ruptures.110 Require an aggressive, intermediate progress milestone schedule, such as a 20 percent yearly completion metric over a 5-year implementation period, for the replacement or retrofitting of legacy DOT-111 and CPC-1232 tank cars to appropriate tank car performance standards, that includes equipping these tank cars with jackets, thermal protection, and appropriately sized pressure relief devices.111 Establish a publically available reporting mechanism that reports at least annually, progress on retrofitting and replacing tank cars subject to thermal
108 Some tank cars may have insulation (typically fiberglass, mineral wool blankets, or foam) applied over the tank and enclosed within a metal jacket. Insulation is used to moderate the temperature of the lading during transportation, but disintegrates at a high temperature. In contrast, a thermal protection system is designed to protect the tank car from the high temperature of a pool fire or torch fire. 109 United States National Transportation Safety Board, Safety Recommendation R-15-014. 110 Ibid., Safety Recommendation R-15-15. 111 Ibid., Safety Recommendation R-15-16.
100| Transportation Safety Board of Canada
protection system performance standards as recommended in safety recommendation R-15-16.112
112 Ibid., Safety Recommendation R-15-17.
FD06101 | 2015_加拿大_TSBC_R15H0021_Crude_Oil_Derailment_Fire_Gogama_Ontario_2015.pdf
分类:06_境外及港澳台调查报告 | 年份:2015 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
RAILWAY INVESTIGATION REPORT R15H0021
Main-track train derailment Canadian National Railway Company Freight train U70451-02 Mile 88.75, Ruel Subdivision Gogama, Ontario 07 March 2015
Transportation Safety Board of Canada Place du Centre 200 Promenade du Portage, 4th floor Gatineau QC K1A 1K8 819-994-3741 1-800-387-3557 www.tsb.gc.ca communications@bst-tsb.gc.ca © Her Majesty the Queen in Right of Canada, as represented by the Transportation Safety Board of Canada, 2017 Railway Investigation Report R15H0021 Cat. No. TU3-6/15-0021E-PDF ISBN 978-0-660-08662-0 This report is available on the website of the Transportation Safety Board of Canada at www.tsb.gc.ca Le présent rapport est également disponible en français.
The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. Railway Investigation Report R15H0021 Main-track train derailment Canadian National Railway Company Freight train U70451-02 Mile 88.75, Ruel Subdivision Gogama, Ontario 07 March 2015 Summary On 07 March 2015, at 0242 Eastern Standard Time, Canadian National Railway Company (CN) crude oil unit train U70451-02 was proceeding eastward at about 43 mph on CN’s Ruel Subdivision when it experienced a train-initiated emergency brake application at Mile 88.70, near Gogama, Ontario. A subsequent inspection determined that the 6th to the 44th cars (39 cars in total) had derailed. As a result of the derailment, about 2.6 million litres of petroleum crude oil (UN1267) was released to atmosphere, water, or surface. The released product ignited and caused explosions, and some product entered the nearby Makami River. A CN bridge over the Makami River (at Mile 88.70) and about 1000 feet of track were destroyed. There was no evacuation, and there were no injuries. Le présent rapport est également disponible en français.
Railway Investigation Report R15H0021 | iii
Table of contents 1.0 Factual information.......................................................................... 1 1.1 The accident ....................................................................................................... 1 1.2 Site examination ................................................................................................. 2 1.3 Locomotive video recorder ................................................................................. 7 1.4 Dangerous goods ................................................................................................ 7
Class 3 flammable liquids......................................................................................................7 1.4.1
Petroleum crude oil ................................................................................................................8 1.4.2
Emergency response procedures for petroleum crude oil .............................................8 1.4.3 1.5 Emergency response ........................................................................................... 9 1.6 Track restoration and bridge replacement.......................................................... 10 1.7 Environmental impact ...................................................................................... 12
Site description ..................................................................................................................... 12 1.7.1
Surface water monitoring program.................................................................................. 12 1.7.2
Wastewater treatment ......................................................................................................... 13 1.7.3
Groundwater monitoring ................................................................................................... 13 1.7.4
Sediment dredging............................................................................................................... 14 1.7.5
Shoreline cleanup ................................................................................................................. 15 1.7.6
Soil excavation and containment ...................................................................................... 15 1.7.7
Product recovery from CN right-of-way ........................................................................ 15 1.7.8
Site restoration ...................................................................................................................... 16 1.7.9 1.8 Track and subdivision information.................................................................... 16 1.9 Track inspection ............................................................................................... 17
Visual inspection .................................................................................................................. 17 1.9.1
Track geometry inspection ................................................................................................. 17 1.9.2
Rail flaw inspection ............................................................................................................. 19 1.9.3 1.10 Rail end batter, localized surface collapse, and crushed head rail surface conditions......................................................................................................... 20 1.11 Vertical split head rail defects............................................................................ 22 1.12 Plug rail repair at Mile 88.75.............................................................................. 24 1.13 Snow patrol foreman and helper information .................................................... 26 1.14 Installing plug rails ........................................................................................... 26 Dye penetrant testing .......................................................................................................... 27 1.14.1 Snow patrol foreman’s familiarity with dye penetrant testing .................................. 27 1.14.2 1.15 Procedural errors .............................................................................................. 27 1.16 Canadian National Railway Company engineering employee development ....... 28 1.17 Canadian National Railway Company engineering organization on the Ruel Subdivision ...................................................................................................... 28 1.18 Track maintenance challenges on the Ruel Subdivision...................................... 29 1.19 Regulatory oversight......................................................................................... 29 1.20 Transport Canada regulatory track inspections.................................................. 30 1.21 Other TSB investigations involving regulatory inspections ................................ 31 1.22 TSB safety issues investigation .......................................................................... 31 1.23 Safety Management System Regulations............................................................ 32 1.24 Canadian National Railway Company’s safety management system .................. 33
iv| Transportation Safety Board of Canada
- 25 Safety culture.................................................................................................... 35
- 26 Safety culture at Canadian National Railway Company ..................................... 36
- 27 Resilience: The safe operating envelope and requisite imagination ..................... 36
- 28 Significant accidents involving Class 111 tank car releases ................................. 38
- 29 The Lac-Mégantic accident ................................................................................ 38
- 30 Response from Transport Canada to TSB Recommendation R14-01 (February
2017)................................................................................................................. 39 1.31 Board assessment of Transport Canada response to TSB Recommendation R14-01 (March 2017).......................................................................................... 40 1.32 Association of American Railroads Circular OT-55-N and TSB Recommendation R14-02................................................................................... 41 1.33 Response from Transport Canada to TSB Recommendation R14-02 (March 2017)................................................................................................................. 41 1.34 Board assessment of Transport Canada response to TSB Recommendation R14-02 (March 2017).......................................................................................... 44 1.35 Census metropolitan area.................................................................................. 45 1.36 Rules Respecting Key Trains and Key Routes .................................................... 46 1.37 Canadian National Railway Company corridor risk assessment......................... 47 1.38 Factors affecting the severity of derailment of tank cars carrying hazardous materials........................................................................................................... 47 1.39 Canadian National Railway Company derailment at Gladwick, Ontario, on 14 February 2015............................................................................................... 48 TSB safety concern regarding speed of unit trains transporting Class 3 1.39.1 flammable liquids................................................................................................................. 48 TSB recommendation relating to maximum speed for trains transporting 1.39.2 dangerous goods .................................................................................................................. 49 1.40 TSB laboratory examination of failed rail components ....................................... 50 Original thermite weld failure........................................................................................... 51 1.40.1 Section of rail containing the east end parent rail ......................................................... 52 1.40.2 1.41 Predicted wheel impacts on rail end mismatch .................................................. 55 1.42 TSB testing of crude oil samples ........................................................................ 56 1.43 Tank car information ........................................................................................ 59 1.44 Site examination of derailed tank cars ............................................................... 64 Tank car breaches ................................................................................................................. 64 1.44.1 Damage to tank car shell .................................................................................................... 66 1.44.2 Thermal damage................................................................................................................... 67 1.44.3 Damage to head shield and tank head ............................................................................ 69 1.44.4 Damage to top fittings and pressure relief devices ...................................................... 70 1.44.5 Damage to manways ........................................................................................................... 70 1.44.6 Damage to skid protection and bottom outlet valves .................................................. 71 1.44.7 Damage to stub sills............................................................................................................. 72 1.44.8 1.45 Legacy Class 111 and Class 111 CPC-1232 compliant tank cars........................... 73 1.46 TSB Watchlist ................................................................................................... 77 Safety management and oversight ................................................................................... 77 1.46.1 Transportation of flammable liquids by rail .................................................................. 78 1.46.2 1.47 TSB laboratory reports ...................................................................................... 79 2.0 Analysis ......................................................................................... 80 2.1 The accident ..................................................................................................... 80
Railway Investigation Report R15H0021 | v
- 2
Plug rail repair.................................................................................................. 81
Dye penetrant testing .......................................................................................................... 81 2.2.1
Rail grinding.......................................................................................................................... 81 2.2.2
Rail end mismatch................................................................................................................ 82 2.2.3 2.3 Snow patrol foreman training regarding broken rails......................................... 83 2.4 Errors of omission............................................................................................. 83 2.5 Ultrasonic rail testing ........................................................................................ 84 2.6 Petroleum crude oil sample analysis.................................................................. 84 2.7 Tank car performance ....................................................................................... 85
Tank car breaches ................................................................................................................. 86 2.7.1
Shell breaches ........................................................................................................................ 86 2.7.2
Breaches caused by thermal tears ..................................................................................... 86 2.7.3
Head and head shield damage.......................................................................................... 87 2.7.4
Manway, top fitting, and pressure relief device damage ............................................ 87 2.7.5
Bottom outlet valve damage .............................................................................................. 88 2.7.6
Stub sill damage ................................................................................................................... 89 2.7.7 2.8 Tank car material properties.............................................................................. 89 2.9 New regulations for tank cars in flammable liquids service................................ 89 2.10 Key train speed................................................................................................. 90 Key train speed through a census metropolitan area................................................... 92 2.10.1 2.11 Rail fatigue life ................................................................................................. 92 2.12 Canadian National Railway Company key route corridor risk assessment ......... 93 2.13 Regulatory oversight for the Ruel Subdivision ................................................... 94 2.14 Emergency response ......................................................................................... 96 2.15 Environmental impact ...................................................................................... 96 3.0 Findings......................................................................................... 98 3.1 Findings as to cause and contributing factors..................................................... 98 3.2 Findings as to risk ............................................................................................. 99 3.3 Other findings ................................................................................................ 100 4.0 Safety action ................................................................................ 101 4.1 Action taken ................................................................................................... 101
Transportation Safety Board of Canada ........................................................................ 101 4.1.1
Transport Canada............................................................................................................... 101 4.1.2
Canadian National Railway Company.......................................................................... 102 4.1.3 4.2 Action required .............................................................................................. 104
Use of leading indicators when planning for regulatory track inspections .......... 104 4.2.1 Appendices ........................................................................................ 106 Appendix A – Other TSB investigations ................................................................... 106 R14W0137 – CN derailment on Fort Frances Subdivision, 23 May 2014 .............................. 106 R14W0256 - CN derailment on Margo Subdivision, 07 October 2014 ................................... 107 R15H0092 – HCRY derailment on Webbwood Subdivision, 01 November 2015 ............... 107 R15H0013 – CN derailment at Gladwick, Ontario, 14 February 2015 ................................... 109 R15H0020 – CN derailment at Minnipuka, Ontario, 05 March 2015 ..................................... 110 Appendix B – National Transportation Safety Board reports involving crude oil trains .............................................................................................................. 112 Appendix C – Census metropolitan areas................................................................. 115
vi| Transportation Safety Board of Canada
Appendix D – Accident site diagram showing tank cars with shell impact breaches (yellow) .......................................................................................................... 116 Appendix E – Accident site diagram showing tank cars with thermal tears (blue) ..... 117 Appendix F – Accident site diagram showing tank cars with head impact breaches (red) ............................................................................................................... 118 Appendix G – Accident site diagram showing tank cars with breached bottom outlet valves (green)........................................................................................ 119
Railway Investigation Report R15H0021 | 1
- 0 Factual information
On 02 March 2015, Canadian National Railway Company (CN) crude oil unit train U70451- 02 (the train) departed eastward from Redwater, Alberta, destined for the Valero Energy Incorporated (Valero) refinery located at Lévis, Quebec. The train consisted of 2 head-end locomotives and 94 tank cars loaded with petroleum crude oil (UN1267). It weighed 13 497 tons and was 5733 feet long. The train was designated as a key train1 operating on a key route. 2 On 06 March 2015, a regular crew change was made at Hornepayne, Ontario, located at Mile 296.2 of CN’s Ruel Subdivision.3 The outbound train crew consisted of a locomotive engineer, a trainee, and a conductor. All crew members met fitness and rest standards and were qualified for their respective positions. The train departed eastward on the subdivision at about 2230. 4 The Makami River flows southward towards the town of Gogama, Ontario (Mile 86.60), and into Minisinakwa Lake. The river then flows around Gogama, turns northeast and flows towards Timmins and the Mattagami First Nation. A CN mainline rail bridge spans the river at Mile 88.70. 1.1 The accident At about 0242 on 07 March 2015, while the train was proceeding at about 43 mph, the locomotive forward- facing video recorded a slight dip just before a train-initiated emergency brake application occurred at Mile 88.70 near Gogama (Figure 1). The train crew looked back and observed a large explosion and ensuing fire. They followed the emergency procedures and made the necessary radio broadcast. After the train came to rest, the crew inspected the train and determined that tank cars behind the 5th car from the head end had derailed and were on fire. The crew disconnected the locomotives and the first 5 cars from
1 The term “key train” is defined as “an engine with cars
a) that includes 1 or more loaded tank cars of dangerous goods that are included in Class 2.3, Toxic Gases, and of dangerous goods that are toxic by inhalation subject to Special Provision 23 of the Transportation of Dangerous Goods Regulations; or
b) that includes 20 or more loaded tank cars or loaded intermodal portable tanks containing dangerous goods, as defined in the Transportation of Dangerous Goods Act, 1992 or any combination thereof that includes 20 or more loaded tank cars and loaded intermodal portable tanks.” (Transport Canada, Rules Respecting Key Trains and Key Routes, Section 3.4) 2 The term “key route” is defined as “any track on which, over a period of one year, [the railway carries] 10,000 or more loaded tank cars or loaded intermodal portable tanks containing dangerous goods, as defined in the Transportation of Dangerous Goods Act, 1992 or any combination thereof that includes 10,000 or more loaded tank cars and loaded intermodal portable tanks.” (Transport Canada, Rules Respecting Key Trains and Key Routes, Section 3.3) 3 All mileages referenced are for the CN Ruel Subdivision. 4 All times are Eastern Standard Time.
2| Transportation Safety Board of Canada
the train and travelled to a safe location east of the fire. There were no injuries and there was no evacuation. Figure 1. Accident location (Source: Railway Association of Canada, Canadian Railway Atlas, with TSB annotations)
Just west of the derailment area, the tail end of the train was blocking the crossing at Highway 144 (Mile 88.98). The crossing was subsequently cleared when the tail end of the train was pulled westward by locomotives from eastbound CN train 112, and the tank cars were left at Stackpool, Ontario (Mile 105.4). The temperature at the time of accident was −9 °C, and there was an 11 km/h wind from the northwest. For the 7 days following the derailment, the weather was similar and close to seasonal norms. 1.2 Site examination The 6th to the 44th cars from the head end (39 tank cars) had derailed (Figure 2). The 6th car (VMSX 310431) had travelled across the rail bridge over the river and derailed upright to the south of the track. The 6th car was subsequently re-railed and removed from the site. The trailing end of the 7th car (VMSX 310442) had struck the south side of the bridge structure and rolled down the south side embankment about 350 feet east of the bridge. Its bottom outlet valve was damaged and product was released. The 8th car (VMSX 311916) struck the bridge heavily and came to rest in the river south of the bridge, along with parts from 5 other cars. Most of the remaining derailed cars had jackknifed on the west approach to the bridge
Railway Investigation Report R15H0021 | 3
and travelled down the south embankment. The last two derailed cars, the 43rd and 44th cars (VMSX 310060 and VMSX 311681), derailed upright and came to rest near Mile 88.75. Figure 2. Site diagram
Of the 39 derailed tank cars, 33 had been breached and released product, fuelling the fire, and some product entered the river. The fire occupied an area about 300 yards in diameter and was centred near the west end of the rail bridge (Figure 3). The bridge and about 1000 feet of track were destroyed (Figure 4).
4| Transportation Safety Board of Canada
Figure 3. Derailment site
Figure 4. Bridge over the Makami River
Approaching the derailment site from the west, there were no impact marks observed on the track infrastructure. At the west end of the derailment site, a number of broken pieces of the south rail were observed in the vicinity of Mile 88.75, as follows: • Sitting beside the track were 2 sections of rail, one measuring 68 inches long and one measuring 78 inches long, which contained a defective field weld (DWF) that had been
Railway Investigation Report R15H0021 | 5
removed from the south rail 3 days before the accident, during the repair of a broken rail (Figure 5). Figure 5. The 68-inch-long section of rail with defective field weld
• The east joint of the plug rail, with joint bars still holding together an intact 53-inch-long section of plug rail and a fractured 20-inch-long section of parent south rail, was recovered about 265 feet west of the west bridge abutment (Figure 6). Figure 6. South rail showing the east joint connecting the plug rail with the parent rail
• Most of the rail head of the 20-inch section had broken off (Figure 7). Only a 4-inch-long piece of the rail head was recovered.
6| Transportation Safety Board of Canada
Figure 7. Field-side view of parent rail in the east joint with mating 4-inch-long rail-head fragment
• The 4-inch-long piece of the rail head that was recovered exhibited a vertical split head (VSH) rail defect (Figure 8). Figure 8. Gauge-side view of vertical split head defect in fragment of recovered parent rail head
• The west joint of the plug rail connected 28 inches of plug rail and 72 inches of parent rail.
Railway Investigation Report R15H0021 | 7
The recovered rail components were sent to the TSB Engineering Laboratory for analysis. During site cleanup, the first derailed car was re-railed and taken to Capreol, Ontario (Mile 0.0), on the Ruel Subdivision. The 7th to 43rd cars were destroyed. The 44th car was re- railed and sent to destination at Lévis, Quebec, on 13 March 2015. 1.3 Locomotive video recorder The lead locomotive, CN2913, was equipped with a forward-facing camera that provided a video and audio recording with date, time, and speed information. Based on the camera’s recording, it was determined that an impact sound and a vibration in the locomotive cab occurred 4 seconds before the train encountered the west end of the bridge. Three seconds later, a train-initiated emergency brake application occurred. 1.4 Dangerous goods The transportation of dangerous goods (DGs) 5 is governed by federal regulations in Canada6 and in the United States.7 These regulations are based on the United Nations Recommendations on the Transport of Dangerous Goods. In this occurrence, petroleum crude oil (UN1267) was being transported in each tank car. The product was listed as Class 3 flammable liquid, Packing Group (PG) I, which is the most hazardous group in this class. Class 3 flammable liquids 1.4.1 Class 3 flammable liquids are DGs whose vapours can form an ignitable mixture with air at or below a temperature of 60 °C. These flammable liquids can pose serious hazards due to their volatility and flammability, which are determined by the initial boiling point 8 and the flash point, respectively.9 Because the volatility and flammability vary widely, products in this class are grouped together based on these characteristics so that different requirements, including packaging, storage, handling, and transportation, can be established. According to the Transportation of Dangerous Goods Regulations, Class 3 flammable liquids are divided into 3 packing groups,
5 Dangerous goods are also referred to as “hazardous materials” or HAZMAT in the United States. In this report, the term “dangerous goods” is used, except when referring to United States regulations or standards. 6 The Transportation of Dangerous Goods Act and Transportation of Dangerous Goods Regulations. 7 United States Code of Federal Regulations, Title 49 (49 CFR), Hazardous Materials Regulations. 8 The initial boiling point of a liquid mixture is the temperature value when the first bubble of vapour is formed from the liquid mixture, at a given pressure. The initial boiling point is a function of pressure and composition of the liquid mixture. 9 The flash point of a liquid is the minimum temperature at which the liquid gives off vapour in sufficient concentration to form an ignitable mixture with air near the surface of the liquid. A lower flash point represents a greater flammability hazard under laboratory conditions.
8| Transportation Safety Board of Canada
ranging from PG I (highest hazard) to PG III (lowest hazard). The specific criteria for these packing groups are: • PG I, if the flammable liquid has an initial boiling point of 35 °C or less at an absolute pressure of 101.3 kPa and any flash point. • PG II, if the flammable liquid has an initial boiling point greater than 35 °C at an absolute pressure of 101.3 kPa and a flash point less than 23 °C. • PG III, if the criteria for inclusion in PG I or PG II are not met. Petroleum crude oil 1.4.2 Petroleum crude oil has a wide range of flammability and volatility characteristics. The product is usually qualified in terms of sulphur content (low sulphur being “sweet” and high sulphur being “sour”) and density (light to heavy). The density of petroleum crude oil is described in terms of its American Petroleum Institute (API) gravity10 (expressed in degrees), where a higher number indicates lower density. The thresholds defining “light,” “medium,” and “heavy” crude oil vary depending on the product’s region of origin and the organization making the determination.11 Petroleum crude oil can also vary in viscosity, which is often referred to as the thickness of a fluid. Products with low viscosity (e.g., water) flow freely, while products with high viscosity (e.g., molasses) are thicker and do not flow freely. Emergency response procedures for petroleum crude oil 1.4.3 Guide 128 of the Emergency Response Guidebook12 identifies the potential hazards of petroleum crude oil products, including petroleum distillates. Guidance is provided for emergency response and for ensuring public safety. Under the heading “Potential Hazards,”13 the guide indicates: • These products are lighter than water, are highly flammable, and will be easily ignited by heat, sparks or flames. • The product vapours are heavier than air; they will spread along the ground and collect in low or confined areas (e.g., sewers, basements, or tanks). These vapours
10 The American Petroleum Institute (API) gravity is a measure of a crude oil’s relative density in degrees API, as defined by the American Petroleum Institute. 11 Petroleum crude oil with an API gravity range above 32° to 37° is generally referred to as a “light” crude oil. Petroleum crude oil with an API gravity range below 20° to 26° is considered a “heavy” crude oil. 12 The Emergency Response Guidebook is a publication for first responders to refer to during the initial phase of a dangerous goods/hazardous materials transportation incident. The guidebook is jointly published by Transport Canada and the U.S. Department of Transportation (DOT) Pipeline and Hazardous Materials Safety Administration (PHMSA). 13 U.S. Department of Transportation and Transport Canada, 2016 Emergency Response Guidebook, Guide 128, “Flammable Liquids (Water-Immiscible),” p. 194.
Railway Investigation Report R15H0021 | 9
may form explosive mixtures with air, and may travel to source of ignition and flash back. • These products are associated with a vapour explosion hazard indoors, outdoors or in sewers, and containers may explode when heated. Under the headings “Emergency Response”14 and “Public Safety,”15 the guide states that • Water spray, fog or regular foam should be used to fight fire, but not straight streams of water. Because these products have a very low flash point, water spray may be inefficient; it may be necessary to use vapour-suppressing foam to reduce vapours. • An initial downwind evacuation for at least 300 metres (1000 feet) should be considered. • All ignition sources must be eliminated. • All equipment used when handling the product must be grounded. • Responders must not touch or walk through spilled material. • The leak should be stopped if it can be done without risk. • Entry into waterways, sewers, basements or confined areas should be prevented. • Spilled product should be absorbed or covered with dry earth, sand or other non- combustible material, and transferred to containers. • Clean, non-sparking tools should be used to collect absorbed material. 1.5 Emergency response The accident occurred about 2 miles west of the town of Gogama and 0.25 miles east of Highway 144. There was good access to the site, which facilitated mitigation activities. CN and the Gogama fire service immediately implemented a unified incident command system. With cooperation from the local municipality, the Gogama town hall, located approximately 2 miles northeast of the derailment site, was established as the incident command center (ICC). The ICC served as the location for internal and external responders to provide updates on remediation plans, site mitigation progress, operational recovery plans, and other safety concerns. CN’s remediation plans were shared with all responders and local stakeholders at regular pre-planned times. Other response agencies established work centres within the ICC to coordinate activities. The ICC also provided relief to responders from the weather, and hot meals were available to responders and support personnel around the clock. Sign-in and sign-out control procedures for all response personnel were established and monitored 24 hours a day from the ICC. CN police and security personnel controlled derailment access at checkpoints surrounding the perimeter of the site.
14 Ibid., p. 195. 15 Ibid., p. 194.
10| Transportation Safety Board of Canada
All responders who required access to the site were issued either a half- or a full-face respirator complete with supporting “fit test” documentation and proper filter canisters. CN dangerous goods officers performed regular air testing throughout the derailment site, monitoring for hydrogen sulfide (H2S) and hydrocarbon explosive level thresholds. Drager tube testing for airborne benzene was conducted at half-hour intervals. Wind socks were erected at strategic locations to provide responders with advance warning when changing wind conditions increased the potential risk of inhalation hazards. Water samples and water testing results from nearby Minisinakwa Lake and its tributaries were on display in the ICC as derailment mitigation and environmental remediation progressed. Photographs and topographical maps were posted, regularly updated, and consistently made available to residents and the general public. Ongoing environmental impact assessments were conducted and discussed among all stakeholders. Future remediation commitments were shared with the local community. CN mobile command posts were positioned at the east end and the west end of the site perimeter. Each command post was equipped with food, water, first aid equipment, and replacement safety equipment for distribution to personnel as necessary, and was used to provide relief to responders from the weather. Secondary job briefings and directions regarding remediation plans were also coordinated and communicated from these mobile command posts. A detailed information session involving provincial and municipal officials, First Nations Chiefs and elders, response agencies, and Gogama residents, was chaired by CN 4 days into the derailment cleanup. A follow-up town hall meeting took place in Gogama in November 2015 to reassure the stakeholders of CN’s continued involvement with the environmental cleanup. 1.6 Track restoration and bridge replacement Because the accident resulted in a lengthy track outage and impacted rail operations, CN constructed a 1482-foot-long diversion track to the south of the accident site (Figure 9).
Railway Investigation Report R15H0021 | 11
Figure 9. Diversion track south of the main track
The diversion bridged the Makami River with 5 culverts (Figure 10) and was in service from 10 March to 18 March. About 130 trains were routed over the diversion track during that period. The destroyed bridge was replaced with 2 previously used beam spans, each measuring 49 feet long, and a steel tray ballast deck. The replacement bridge was supported on the existing bridge abutments. A new centre pier was built out of 4 steel casings filled with concrete and a new precast concrete cap. The first train went over the new bridge on 18 March 2015. Once the new bridge (Figure 11) was operational, the diversion track over the Makami River was removed and the riverbed restored. Figure 10. Diversion track over Makami River
12| Transportation Safety Board of Canada
Figure 11. Replacement bridge over Makami River
- 7
Environmental impact Site description 1.7.1 Along the north shore of the river, there is a low-lying wetland area. Along the south shore of the river, there is a low-lying wetland area and an upland dense forested area. Old Gogama Road (also known as Hazel Street) is located south of the track and generally runs parallel to the mainline track and the river. Old Gogama Road crosses the river at the Bailey Bridge, located about 250 m downstream (south) of the mainline rail bridge. The majority of the tank cars derailed along the north shore of the river just east and west of the north abutment of the rail bridge. Two tank cars came to rest in the river. Initially, there was visual evidence of released product in the river and along the north shore, east and west of the mainline. Of the more than 4 million litres of petroleum crude oil transported in the derailed cars, approximately • 1.6 million litres of product burned to atmosphere; • 1 million litres of product was lost to surface or water; and • 1.4 million litres of product was recovered and transferred from the tank cars. Surface water monitoring program 1.7.2 Following the initial site containment and booming strategies, a surface water sampling program was initiated within the river and Minisinakwa Lake. A total of 14 sample stations were established upstream of the derailment site and downstream of the river extending into
Railway Investigation Report R15H0021 | 13
Minisinakwa Lake. Samples were collected daily for several weeks until the test results stabilized. Sampling frequency was reduced to twice weekly following several consecutive rounds of sampling which showed no detection of petroleum products, as verified with the Ontario Ministry of the Environment and Climate Change and Environment and Climate Change Canada. Reduced sampling continued along and within the river until November 2015. During the winter, the sites were inspected on a monthly basis as part of monthly groundwater sampling and product collection events. Surface water monitoring resumed in the spring of 2016 and was expected to continue on a quarterly basis for an indefinite period. Despite these efforts, a thin sheen of oil on the river surface and some dead fish were reported by concerned citizens during the summer of 2016. CN followed up on these concerns and continued to sample and test the soil, sediment, and water in the areas identified. Tests were also conducted on some of the dead fish. Initially, an independent review determined that the test results met regulatory standards, and the results were shared with community leaders. However, at the time that this TSB investigation report was released, Environment and Climate Change Canada was continuing to investigate alleged violations of the pollution prevention provisions of the Fisheries Act related to this accident. Wastewater treatment 1.7.3 A water treatment plan was initiated to treat all recovered impacted water. A mobile wastewater treatment unit (MTU) was sent to the accident site. However, after several attempts to treat the impacted water, it was determined that on-site treatment would not be possible due to the levels of petroleum hydrocarbons present in the water. Arrangements were made with an off-site disposal facility operated by Clean Harbours in Sarnia, Ontario, which was approved by the province to accept the impacted oily water. The oil/water mixture collected at the site was stored in temporary fixed-axle storage tanks (frac tanks). Several of the frac tanks were set up with a series of baffles that helped concentrate the oil as much as possible. The concentrated oil was removed from the tops of the frac tanks and packaged in dedicated frac tanks as a separate waste stream. The concentrated oil was sampled and analyzed for potential recycling or reuse. The remaining oily water and emulsion was shipped by tank truck for off-site disposal. The water was separated and treated. When it was determined that the water met regulatory requirements, it was discharged back into the natural environment. Although the most significant wastewater treatment activities had been completed, a small amount of oil remained in the ecosystem, as confirmed by water tests taken throughout the cleanup process. However, independent test results showed that water quality in the ground, river, and lake met regulatory standards. Groundwater monitoring 1.7.4 A total of 19 groundwater monitoring wells were installed to verify the direction of groundwater flow and depth, and to determine whether groundwater had been impacted.
14| Transportation Safety Board of Canada
The wells were installed around the site perimeter, which included both sides of the CN right-of-way within the CN property limits and on Crown land. Petroleum was detected in 3 wells located along the containment area and the CN right-of- way property boundary. Following remediation of the containment area, the detected concentration of petroleum at these 3 wells decreased to the point where it was considered to be of minor residual impact rather than a leak within the containment system. As of June 2017, 2 of the wells located on Crown land exceeded provincial standards for hydrocarbons, and monitoring was ongoing. In September 2016, an additional 10 monitoring wells were installed along the west bank of the Makami River. As of June 2017, one of the 10 new wells exceeded provincial criteria for toluene and petroleum hydrocarbons, and ongoing monitoring was required. Sediment dredging 1.7.5 Sediment dredging from the riverbed was completed under the approval of the Ontario Ministry of Natural Resources and Forestry, the Ontario Ministry of the Environment and Climate Change, and Fisheries and Oceans Canada. The dredging consisted of vacuum removal of sediment within a section of the river, beginning upstream of the CN rail bridge and continuing downstream to the Bailey roadway bridge. The start and end points of the sediment removal were determined by an ecological risk assessment that included the collection and analysis of sediment samples taken throughout the entire river. The depth of sediment removal ranged from 15 cm to 30 cm, depending on the topography of the riverbed. Impacted sediment was removed and disposed of at a licensed facility. Water effluent from the sediment dredging was treated using an on-site MTU. The MTU, which was provincially governed and approved, was operated under a mobile Certificate of Approval or Environmental Compliance Approval that contained sampling requirements and discharge criteria. The criteria were strictly adhered to before any treated water was discharged back to the natural environment. In October 2015, water treatment was terminated after the sediment dredging operations were completed. In 2016, local residents continued to report the presence of oil sheens on the river surface when sediment was disturbed. In response, CN re-established a consultation panel of experts in the fall of 2016. The panel included representatives from Environment and Climate Change Canada, Fisheries and Oceans Canada, the Ontario Ministry of Natural Resources and Forestry, the Ontario Ministry of the Environment and Climate Change, the Gogama Local Services Board, and the Mattagami First Nation, as well as subject-matter experts in sediment remediation. It was subsequently agreed by all parties that additional riverbed dredging operations were to be conducted within the area of the rail bridge and in 2 areas just south of Bailey Bridge. The riverbed in each of the 3 areas was vacuumed, dredged, and cleared of sediment. To help the sediment re-establish continuity and create new fish spawning areas, the riverbed was then restored by placing a layer of clean pit stone (cobble and boulder-sized) which was
Railway Investigation Report R15H0021 | 15
covered with pea gravel. The elevations and amount of material added were assessed on a case-by-case basis, based on pre-dredge elevations and the volume of material removed. Sampling of the river and derailment site is to resume in the spring of 2017. Shoreline cleanup 1.7.6 Two shoreline cleanup assessment techniques (SCAT) were completed to address the potential impacts to the river and lake shorelines. The SCAT teams included representatives from Environment Canada, the Mattagami First Nation, the Gogama local services board, and several SCAT-certified technicians. Visual and physical inspection of the shorelines, accessible surface water, and associated vegetation were conducted on the entire river downstream of the derailment as well as the north, south, and island shorelines of Minisinakwa Lake. Both assessments were documented in a full SCAT report. The first SCAT assessment identified 4 areas along the river as well as locations on the north shore of Minisinakwa Lake and the main island that had signs of oil deposit or staining. The second SCAT assessment identified relatively small areas of wetland and upland grasses within the river that showed staining. SCAT crews subsequently cut and removed all impacted vegetation. Soil excavation and containment 1.7.7 There was a significant volume of impacted soil adjacent to the north rail bridge abutment. This area contained natural low-lying wetlands where pike had historically spawned. Because these areas were prone to seasonal flooding and high spring water levels, it was imperative to excavate the impacted soils as soon as possible to minimize damage to the fish stock and eliminate the potential for impacted soils to be washed from the site and downstream into the river. A total of 8 lined soil containment cells were constructed to store contaminated soil until it could be transported to an approved landfill site. Impacted soil was loaded into the cells and stored while soil excavation and sample testing was completed. Each cell could contain about 2500 m3 (5000 tonnes) of soil. The cells were tarped to prevent precipitation from entering the contaminated soil. A total of about 37 500 m3 of contaminated soil was shipped by truck to an approved landfill in Cartier, Ontario. Product recovery from CN right-of-way 1.7.8 A non-permeable liner and sheet pile wall were installed along the east and west sides of CN’s right-of-way property boundary. The liner and sheet pile were tied into a concrete cut- off wall that was connected to the bridge abutment. This arrangement created a containment basin for any remaining product that might seep out of the ballast. Each month, any remaining product was removed and disposed off-site at a certified facility.
16| Transportation Safety Board of Canada
Site restoration 1.7.9 CN submitted a detailed restoration plan to the regulatory agencies and to the Mattagami First Nation for consideration and comment. Site restoration, which included a diverse planting program to return the lost vegetation species that were native to the area, was completed with the assistance of the local Mattagami First Nation in the fall of 2016. Shoreline restoration was completed in the fall of 2016. A fish spawning lagoon was created in the vicinity of the bridge. CN prepared a remediation report, which was made available to the regulators and the Mattagami First Nation. A follow-up report was to be prepared to document the restoration work and any additional remedial work required to complete site restoration. Following each sampling program, a summary report was prepared and submitted to the Ontario Ministry of the Environment and Climate Change. These summary reports were to continue until it was determined that no further monitoring or remedial action was required. Normally, site restoration is not considered complete until approval for site closure is received from the Ontario Ministry of the Environment and Climate Change. 1.8 Track and subdivision information All railway lines are defined as a particular class of track that is related to the condition or maintenance level of the track. The Transport Canada (TC)–approved Rules Respecting Track Safety, also known as the Track Safety Rules (TSR), outline classes of track and the associated maximum permitted train speeds for each class. Under the TSR, the lowest class of track is Class 1, which restricts freight train speed to a maximum of 10 mph, and the highest class of track is Class 5, which has a maximum permitted freight train speed of 80 mph. CN’s Ruel Subdivision consists of a single main track that extends westward from Capreol, Ontario (Mile 0.0) to Hornepayne, Ontario (Mile 296.2). Train movements on the subdivision are governed by centralized traffic control (CTC), as authorized by the Canadian Rail Operating Rules (CROR), and supervised by a rail traffic controller (RTC) located in Toronto, Ontario. In the vicinity of the derailment, the track is Class 4. The authorized track speed is 50 mph for freight trains and 55 mph for passenger trains. Traffic on the Ruel Subdivision consisted of an average of 18 freight trains per day. A VIA Rail Inc. passenger train operated westbound on Wednesdays and Sundays, and eastbound on Wednesdays and Fridays. The track throughout the derailment area is tangent single mainline generally oriented in an east-west direction. It consists of 136-pound continuous welded rail (CWR) manufactured by Sydney in 1993. Rail wear was measured at 8 mm, which was less than 75% of the vertical condemning limit. The rail was laid on 14-inch double shoulder tie plates supported by No. 1 hardwood ties spaced at 20-inch centres, secured with 5 spikes per plate, and box- anchored every second tie. The ties were in fair condition. The ballast was clean crushed rock. The shoulders were about 12 inches wide, the cribs were full, and the drainage was good.
Railway Investigation Report R15H0021 | 17
The Makami rail bridge was a 99-foot-long single span, open-deck, thru-plate girder bridge built in 1910. The bridge had 115-pound guard rails spiked to the bridge timbers with transition ties on both ends. It was inspected annually. The last inspection had been conducted on 17 September 2014, with no defects recorded. Between 2010 and 2014, rail freight traffic on the Ruel Subdivision had increased from 32.8 million gross ton miles per mile (MGTM/M) to 47.1 MGTM/M (Table 1). During the same period, the number of car loads of petroleum crude oil had increased from 62 to 75 186. Table 1. Freight and crude oil traffic over the Ruel Subdivision Year Freight (MGTM/M)* Freight GTM (thousand) Crude oil GTM (thousand) Crude oil (carloads) Crude oil (MGTM/M) 2010 32.8 9 709 654 2 263 62 0.007 2011 35.3 10 452 629 71 369 2 843 0.240 2012 36.8 10 897 795 459 077 19 399 1.549 2013 37.2 11 013 838 835 271 34 384 2.819 2014 47.1 13 956 400 1 937 152 75 186 6.540
- The terms million gross tons (MGT), gross ton miles (GTM), MGTM, and MGTM/M are
used interchangeably in the rail industry. 1.9 Track inspection For federally regulated track, the minimum regulatory requirements for track inspection are set out in the TSR. Where track is identified as not meeting the track safety rules, the railway company must immediately bring the track into compliance or halt operations over that track. 16 Visual inspection 1.9.1 The TSR require Class 4 track to be visually inspected twice a week. During the winter of 2015, CN instituted a requirement for daily track inspections in the Northern Ontario Zone because of temperature, snow, and track conditions. The track was visually inspected by an assistant track supervisor (ATS) on 04 March 2015. No defects were noted in the area of the joint. Track geometry inspection 1.9.2 According to the TSR, for Class 4 track with more than 35 MGT of annual traffic, a track geometry inspection must be performed with a heavy geometry inspection vehicle at least 2 times a year.
16 Transport Canada, Rules Respecting Track Safety (25 May 2012), Part I: General, section 6.2: Responsibility of the Railway Company, page 6.
18| Transportation Safety Board of Canada
On the Ruel Subdivision, CN conducted track geometry testing 4 to 6 times per year.17 The most recent track geometry car inspection had been completed on 02 November 2014, about 3 months prior to the derailment. No defects were detected within a mile of the derailment location. Table 2 provides a summary of CN priority, near-urgent, and urgent geometry defects on the Ruel Subdivision from 2011 to 2014. Table 2. Geometry defects on the Ruel Subdivision from 2011 to 2014 Defect type 2011 2012 2013 2014 Priority 14 538 30 634 13 827 9 053 Near-urgent 5 030 11 971 5 326 2 289 Urgent 390 892 308 302 Total 19 958 43 497 19 461 11 644 CN Engineering Track Standards (ETS), track standard (TS) 7.1, “Track Geometry,” specifies (in part) that
- Deviations exceeding Transport Canada Track Safety Rules……for track
geometry are defined as “URGENT” defects.18 TS 7.1 further indicates that
- Where a portion of the track exceeds the limits defined as “URGENT”, one
of the following actions must be immediately taken before the operation of the next train over the defect(s):
i. the defect must be repaired to within the allowable tolerances;
ii. […]if the defect is a speed-related type, a temporary slow order (TSO) must be placed restricting trains to a maximum speed which is within the track class allowed for the severity of the defect(s); or
iii. operation over the track must be halted.19 Deviations approaching track geometry limits specified in the TSR are defined as “NEAR- URGENT” conditions. CN TS 7.1, Item 3, states that i. NEAR-URGENT conditions will be identified by the Geometry Car and must be inspected within 72 hours and remedial action must be taken within 30 days. TS 7.1, Item 4, states that
17 Canadian National Railway Company, Corridor Risk Assessment Toronto – Winnipeg (23 June 2014), p. 24. 18 Canadian National Railway Company, Engineering Track Standards (June 2011), TS 7.1: Track Geometry, p. 137. 19 Ibid.
Railway Investigation Report R15H0021 | 19
- Deviations exceeding CN recommended maintenance tolerances are
defined as “PRIORITY” conditions. Where a portion of track exceeds the limits defined as priority, the condition must be monitored until it is repaired to ensure it does not escalate to an “URGENT” defect.20 Rail flaw inspection 1.9.3 According to the TSR, on Class 4 track with more than 35 MGT of annual traffic, a rail flaw inspection must be performed at least 4 times a year. Inspection equipment must be capable of detecting rail defects between joint bars in the area enclosed by the joint bars. CN performs rail flaw inspections on the Ruel Subdivision approximately every 20 days throughout the winter months and every 37 days throughout all other seasons.21 The 2 most recent tests had been conducted by Sperry Rail Service on 06 February 2015 and 02 March
- No rail defects were detected in the south rail in the vicinity of the derailment.
Between January 2014 and March 2015, rail flaw testing on the Ruel Subdivision identified 570 flaws (Table 3), which included 332 localized surface collapses (LSC), 87 rail end batters (REB) and 19 crushed heads (CH). These rail surface conditions primarily occurred in 136- pound rail manufactured by Sydney and Algoma from 1990 to 1999 and required a significant amount of monitoring and/or repair work for inspectors and maintenance crews. VSH defects accounted for 5% of the detected defects. 20 Ibid. 21 Canadian National Railway Company, Corridor Risk Assessment Toronto – Winnipeg (23 June 2014), p. 24.
20| Transportation Safety Board of Canada
Table 3. Rail surface conditions and rail defects detected during rail flaw testing on the Ruel Subdivision from January 2014 to March 2015 Rail surface condition or rail defect Number Percentage * Bolt hole 31 5% Crushed head 19 3% Defective weld – field 35 6% Defective weld – plant 8 1% Detail fracture 12 2% Horizontal split web 3 1% Horizontal split head 7 1% Localized surface collapse 332 58% Rail end batter 87 15% Split web 5 1% Vertical split head 31 5% Total 570 100%
- Some values have been rounded
- 10 Rail end batter, localized surface collapse, and crushed head rail
surface conditions Rail end batter (REB) occurs at a rail joint when the ends of the rail heads within the joint are mismatched and/or the gap between the rail ends is too large. REB is indicative of degrading joint support that can result in excessive joint movement which can be further degraded by mechanical interaction from repetitive wheel loadings. If not properly addressed in the field, REBs can ultimately result in joint failure and derailment. A localized surface collapse is characterized by plastic metal flow, leading to the flattening out and deformation of the rail head above the plane of the rail head / web fillet (Figure 12). A crushed head (CH) is similar to a localized surface collapse (LSC) with the exception that CH deformation of the rail head extends to below the plane of the rail head /web fillet. LSCs and CHs are normally caused by mechanical interaction from repetitive wheel loadings. They can result in high contact stresses and can lead to or accelerate the development of other rail defects such as a transverse detail defect (TDD) or a vertical split head (VSH) which can fail rapidly and result in a derailment. Rail flaw technology to detect LSC, REB, and CH conditions is relatively new. CN has recorded surface conditions such as LSCs, CHs, and REBs since 2005. In 2010, more defined guidelines for these types of conditions were introduced. Since that time, there has been a significant increase in the number of conditions detected. Some railways have developed comparable, but not harmonized, thresholds to detect and record these conditions. Before this technology was implemented, these conditions were usually detected by visual
Railway Investigation Report R15H0021 | 21
inspection, but relatively few were identified. After this technology was implemented, the number of these rail surface conditions identified has significantly increased. Figure 12. Photograph of a typical localized surface collapse
Although CN considered the workforce to be adequate and properly equipped, the larger number of LSC, REB, and CH rail surface conditions that were identified represented a significant increased workload. This was especially true in the spring, when the workforce was actively engaged in removing rail plugs and rail joints installed in CWR territory during the winter months when rail defects were removed. Each LSC, REB, and CH rail surface condition had to be monitored and measured, and then removed if the standards specified in CN ETS TS 1.7, “Rail Testing and Remedial Action for Broken Rail”, were exceeded. The standards identify that: • Item 10a requires the monitoring of LSC conditions that are less than 5 mm in depth, on rail worn to less than 75% of the vertical rail wear condemning limit. • Item 10b outlines the limits for REB in the winter months:
During the winter months (as determined by the Regional Chief Engineer), the following applies to in-track rail joints in Class 3 track and greater with annual MGT’s of 10 or greater.
If joint rail end batter is found to be it. [sic]
- 5 mm
4 mm = 5 mm
• Must be measured twice a week. •Must be changed out within 48 hours. • If rail cannot be changed, place a 40 mph TSO [temporary slow order] until it is changed out. • 30 mph • Must be changed within 48 hours - no exceptions.
22| Transportation Safety Board of Canada
The depth of an LSC or REB is measured using a straight edge, as shown in Figure 13. The TSR contain no guidance or condemning criteria for LSCs, REBs or CHs. In Canada, they are categorized as rail surface conditions rather than rail defects. While they are not considered service failures, they are considered to be leading indicators of degrading track condition and potential emerging rail defects. In comparison, the U.S. Department of Transportation (DOT) (i.e., the Federal Railroad Administration (FRA)) considers “flattened rail,”22 the FRA equivalent of LSC, to be a defect when it is 3/8 inch or more in depth and 8 inches or more in length. Remedial action for this defect consists of limiting operating speed over a defective rail to 50 mph or to the maximum allowable speed permitted for the class of track concerned, whichever is lower. 23 1.11 Vertical split head rail defects A VSH defect is a progressive longitudinal fracture through or near the middle of the rail head, extending into or through it. The origin is web streaking and segregation that create an internal longitudinal seam. Web streaking and segregation are indications that inclusions in the steel have congregated along the centreline of the rail rather than being evenly distributed during the manufacturing process. Vertical separation will progress longitudinally and vertically (parallel to the side of the head), and may gradually turn
22 The Federal Railroad Administration’s Track Inspector Rail Defect Reference Manual (Revision 2, July 2015) states that “‘flattened rail’ is a short length of rail, not at a joint, that has flattened out across the width of the rail head to a depth of 3/8 inch or more below the rest of the rail and 8 inches or more in length. Flattened rail occurrences have no repetitive regularity and thus do not include corrugations, and have no apparent localized cause such as a Weld or engine burn. Their individual lengths are relatively short, as compared to a condition such as head flow on the low rail of curves.” 23 Federal Railroad Administration, Track and Rail and Infrastructure Integrity Compliance Manual (January 2014), Volume II: Track Safety Standards, Chapter 1: Track Safety Standards Classes 1 through 5. Figure 13. Diagram from Canadian National Railway Company Engineering Track Standards, Track Standard 1.7, Item 11, showing how to determine the depth of crushed heads, localized surface collapse, and rail end batter
Railway Investigation Report R15H0021 | 23
toward the gauge or the field side of the rail head. Defect growth is normally very rapid once the seam or separation has opened up anywhere along its length. During manufacturing, rail is generally formed by rolling continuous rectangular cast steel billets through a series of rollers at controlled temperatures in a steel blooming mill. Each rail is assigned a heat number which is hot stamped on the rail web. Rails in the same heat may have different properties (and defects) depending on the quality control in the casting and rolling process. During the rolling process, some impurities can be forced into the centre of the rail web. When subjected to macroscopic examination, the impurities display as a tight seam within the web. On some occasions, the seam extends into the head of rail. This becomes problematic when the rail head wears down and the seam is exposed to dynamic loading due to service conditions (i.e., wheel loads as they traverse the rail). Once exposed to dynamic loading, the seam, which is not detectable by rail flaw detection until it opens, can rapidly deteriorate and result in a VSH rail failure. Sydney Steel Company24 had experienced a number of process and quality control problems with its rail manufacturing throughout its history. One problem had been the presence of centreline streaking that extended into the rail head. Once a rail head had sufficient wear, the tip of the centreline streaking was in an area of the rail head that was subjected to the highest rolling contact forces, making it more susceptible to rapid VSH development and fracture propagation. The U.S. Department of Transportation FRA Title 49 CFR, Part 213, Track Safety Standards: Improving Rail Integrity: Final Rule, dated 24 January 2014, discusses the development of internal rail flaws and the risk of failure. The Final Rule states that, in practice, the growth rate of rail defects is considered highly inconsistent and unpredictable. High traffic volumes load the rail and accelerate defect growth. The tonnage required to influence defect development is also considered difficult to predict. However, once a defect is initiated, tonnage influences its internal development and growth.25 Although difficult to detect visually, a crack or rust streak may show in the head/web fillet area under the head. There may also be signs of sagging or dropping, or pieces may split off the side of the head. The Sperry Rail Service Rail Defect Manual describes VSH defects as dangerous fatigue defects because:
- It is usually not visible on the rail surface until it has grown to a length of
several feet.
- As VSH usually extends longitudinally for some distance, a considerable
portion of the rail head is weakened.
24 Sydney Steel Company closed in 2001. 25 U.S. Federal Railroad Administration, Title 49 CFR, Part 213, Track Safety Standards: Improving Rail Integrity: Final Rule (24 January 2014), Supplementary Information, Part II, Section D.
24| Transportation Safety Board of Canada
- If the split is on the gauge side of the rail and breaks off in service, car
wheels will tend to climb to the top of the rail or drop into gauge thus causing a derailment.
- When the rail breaks in-service, it may break into several pieces.26
VSH defects are a common fatigue defect and considered dangerous given that they can develop rapidly and their presence is difficult to detect, even with ultrasonic inspection. In 2014, Sperry Rail Service detected a total of 33 241 defects while testing 134 054 miles of CN track in Canada. VSHs accounted for 1533 (4.6%) of these defects. During the same period, CN reported 692 rail in-service failures, 76 (11%) of which were due to VSH defects. 1.12 Plug rail repair at Mile 88.75 The CTC signal control system on the Ruel Subdivision is divided into a series of sections or “blocks” that are electrically isolated from each other. Signals at each end of a block control movements into and out of that block. When a train is in a block, signals at each end of the block are RED, meaning “stop”, and the RTC display will indicate that the block is occupied. Signals can also default to a RED indication when a broken rail occurs in the block. On 04 March 2015, at about 1935, the signals controlling traffic into the Gogama-Bethnal block (Mile 86.20 to Mile 94.70) unexpectedly changed to a RED indication, prohibiting rail traffic from entering the block. Therefore, it was necessary to quickly find the source of the RED signal activation. The regular track maintenance foreman (TMF) was not available, because he had been called out to replace a defective rail east of Gogama. The track supervisor (TSPVR) instructed the snow patrol foreman (SPF), who was a thermite welding foreman during the summer, and a helper on light duties who was unable to assist much physically, to determine the source of the RED signal activation. At 2021, the SPF obtained a track occupancy permit (TOP) and proceeded by high-rail vehicle to investigate. The SPF was followed by a signal maintainer on the same TOP. At about 2050, the SPF, the helper, and the signal maintainer located a broken thermite weld in the south rail at Mile 88.75. The SPF took a picture of the broken rail, sent it to the TSPVR, and requested instructions on how to proceed. Given the 4-inch offset of the broken rail, the TSPVR indicated that the broken rail would need to be changed out before any trains would be able to pass over the area. However, the section work crew was at the end of its shift and nearing the end of available hours to operate the track force optimization (TFO) vehicle. The TSPVR instructed the SPF and the helper to change out the rail. The SPF was also a qualified track foreman and, as such, was considered qualified to change out the broken rail. The signal maintainer measured the rail head loss of the broken rail and notified the Gogama TMF that they would require a plug rail with 8 mm of head loss. The SPF proceeded to 26 Sperry Rail Service, Rail Defect Manual Compiled by Sperry Rail Service for the Use of the Railroads, “Longitudinal Defects in the Rail Head,” p. 43.
Railway Investigation Report R15H0021 | 25
Gogama, where he met with the section work crew. A 157-inch plug rail with 8 mm of rail head loss was loaded on to the TFO vehicle. This plug rail had pre-drilled holes for joint bar bolts at one end. As the SPF was not familiar with the TFO vehicle, the section work crew provided the SPF with a familiarization briefing before the crew went off duty. Once briefed, the SPF drove to the Highway 144 crossing, put the TFO vehicle onto the track, and proceeded east to the site of the broken rail. After arriving on site, the SPF prepared for the installation of the plug rail. The plug rail was unloaded and positioned. Snow and ice was cleaned away from the parent rail. A mark was made on the parent rail 68 inches west and 78 inches east of the broken weld to position the plug rail ends between ties. Eleven inches of material was cut from the plug rail. The parent rail was cut and the exposed rail ends were visually inspected for cracks or other anomalies. 27 No cracks were visually observed; however, a dye penetrant test was not performed to confirm the presence of any cracks. The CN requirement to perform a dye penetrant test on the exposed rail ends had not specifically been discussed between the SPF and the TSPVR. The plug rail was rolled into the track with no joint gaps. Because the east end of the plug rail was pre-drilled for 132-pound joint bars,28 only the west end of the plug rail had to be drilled. However, the drilling template was placed on top of the plug rail in a way that resulted in the outside hole being drilled too close to the joint. Consequently, an extra hole had to be drilled in the plug rail. The two holes were about ½ inch apart. This situation was discussed with the TSPVR, and the rail repair was approved for service. Once the drilling was complete, the plug rail was fully bolted, spiked, and anchored. While the repair was being performed, the SPF received several phone calls and radio calls from the TSPVR, the RTC, and the Senior Manager Engineering (SME) for progress updates. The SPF was informed that a number of eastbound and westbound trains were already waiting. The plug rail was not physically measured after the repair, but the SPF visually estimated that it was 2 mm higher than the parent rail at the east end of the installation. The SPF used a hand grinder to ease the transition between the two surfaces by grinding the top of the rail for about 2.5 inches from the east end of the plug rail. The hand grinder was used because the larger rail grinder was not available. The work was completed at about 2245. The SPF cleared the track and drove back to the tool house to prepare for snow clearing duties for the remainder of the shift. The TOP was cancelled at 2307:40, and rail traffic was restored.
27 Heat generated by a rail saw can open up a crack. 28 132-pound joint bars are interchangeable with 136-pound joint bars because rail sections are identical except for head height difference of 5 mm (new rail).
26| Transportation Safety Board of Canada
The TSPVR had intended to check the broken rail repair to ensure that it had been properly completed. However, the TSPVR became occupied the following morning responding to another derailment near Minnipuka, Ontario (Mile 243.50 on the Ruel Subdivision). Between the time that the track repair was completed on 04 March 2015 and the occurrence on 07 March 2015, 44 trains, including other crude oil unit trains, had traversed the plug rail. 1.13 Snow patrol foreman and helper information The SPF joined CN in 1998 and worked as a thermite welding foreman on production gangs during the summer, which primarily involved welding new rail to new rail. At the end of the summer/fall work season, the SPF became part of CN’s winter workforce. At the time of the occurrence, the SPF was on snow clearing duties and was working a 9 days on, 5 days off cycle on the night shift, stationed at Gogama. The helper had worked as a machine operator for CN for 8 years. On 03 March 2015, the helper had been sent to Gogama to work with the SPF while the regular machine operator was away. The helper was on light duties and had little experience in changing out broken rails and performing plug rail repairs. 1.14 Installing plug rails The process for changing out a broken or defective rail and the related training were covered in various CN training classes and documents. Specifically, the installation of plug rails was covered in the Track Maintainer course and in an on-the-job training manual. Handling the rail with a crane was covered in the Crane Fundamentals course and the Crane Handbook. The standards regarding match marks, dye penetrant, and plug rail length were covered in CN’s Engineering Track Standards (June 2011) (ETS) and Recommended Methods (RM). CN ETS TS 1.2, “Laying Rail - General,” Item 13, states (in part) that Where rail end mismatch exceeds 1/8” (3mm) on the top or the gauge side of a rail joint, it shall be repaired promptly by grinding, welding or replacement of the rail. Item 13 further specifies the track speed reductions that are required if such repairs cannot be carried out immediately. This section of the ETS contains no guidance on the length of grinding required to provide a smooth transition between rail sections of plug rail repairs. In comparison, the CN Welders Manual (2005), Chapter 17, states (in part): • for flash butt welding, the maximum vertical offset for two rails thermite welded together must not exceed 1/8 inch (0.125 inches) [3 mm]; and • if a difference in height exists, it should be corrected by grinding the high rail over a distance of 6 inches for every 0.01 inch of offset up to a maximum of 36 inches. CN ETS section 1.7(2) states (in part):
Railway Investigation Report R15H0021 | 27
When removing rail defects from track, careful examination of the adjacent rail ends of the parent rail must be performed to ensure that the defect has been completely removed. Regarding dye penetrant testing, ETS 1.7(3) states (in part): Dye penetrant testing shall be performed on rail ends: a. in the event of an in-service rail failure; Dye penetrant testing 1.14.1 The required steps to perform when testing the rail with dye penetrant are listed in CN Recommended Method (RM) 1.7.3 (January 2015). Dye penetrant testing is a 3-step process that involves spraying a cleaner, a penetrant, and a developer chemical on the exposed cut of the rail end. The test takes about 15 minutes to perform and can be done while preparing the plug rail for installation. This test is based on capillary action, where a low-surface-tension dye penetrant fluid is sprayed on a rail end. After time has been allowed for penetration, excess penetrant fluid is removed and a developer is applied. The developer helps draw the penetrant out of a flaw or crack and onto the surface, making the crack visible. Dye penetrant testing can be conducted on rails at temperatures as low as −32 °C. However, for best results, both the penetrant and the developer should be kept warm. In cold weather, the penetrant should be sprayed on the rail ends immediately after the rail has been cut, as the heat from cutting will aid in opening any cracks that may be present. Snow patrol foreman’s familiarity with dye penetrant testing 1.14.2 The SPF was aware of the dye penetrant test but had never done it before or seen it done. When working as a thermite welding foreman, the SPF had worked primarily with new rail. The dye penetrant test was typically conducted for older rails removed from track due to an in-service failure. On 27 January 2015, the SPF took the CN Engineering winter safety online exam, which included some questions about dye penetrant testing. The passing grade for the exam was 90%. On the first attempt of the exam, the SPF obtained a mark of 74% and had 12 incorrect answers, including a question about the dye penetrant testing. On the second attempt, the SPF answered the dye penetrant question correctly and obtained a mark of 96%. 1.15 Procedural errors Errors of omission, including skipping steps in a maintenance procedure, have been shown to be among the most frequent errors during maintenance activities. These types of errors are more likely to occur in situations where the required step is not critical to achieving the main goal of the maintenance activity or takes place after the main goal has been achieved, and where there are few environmental triggers to remind the maintainer that a step needs to be
28| Transportation Safety Board of Canada
performed. Tasks that have recently changed, or need to be conducted in a manner or order that is unusual for the maintainer, are also more prone to errors of omission.29 In situations where reminders cannot be built into the maintenance task itself, external reminders are the simplest countermeasure to ensure that critical steps are completed. To be effective, reminders need to be timely (visible at the appropriate time) and compelling (prevent the task from being completed without a procedural check). Commonly used means of building these characteristics into a reminder include the use of checklists or task cards for commonly performed maintenance tasks and independent checks of critical maintenance activities before returning equipment to service. 1.16 Canadian National Railway Company engineering employee development Unionized engineering employees were initially hired as track maintainers. Track maintainer training consisted of a 3-week course at CN’s training centre in Winnipeg. The first week covered general introductory topics related to working for CN, the second week was specific to the role of a track maintainer, and the third week was devoted to CROR training. Candidates were required to pass an exam related to track maintenance at the end of the second week in order to proceed to rules training. There were very few failures at this stage of the training. A rules test was administered at the end of the third week. About 75% of the candidates successfully passed the rules test on their first attempt. Candidates who were unsuccessful could attempt the test a second time after 90 days of field experience. The success rate on the second attempt was approximately 95%. Once qualified as track maintainers, employees could bid to become a track foreman (TF). The TF course was a 10-day course and included a number of mandatory courses, including track inspection guideline (TIG) training, CWR training, and crane qualification. TFs were required to renew their TIG and CWR training every 3 years; this was tracked through CN’s training management system. 1.17 Canadian National Railway Company engineering organization on the Ruel Subdivision CN’s Ruel Subdivision extends westward for 296.2 miles from Capreol (Mile 0.0) to Hornepayne (Mile 296.2). To facilitate track inspection and maintenance activities, the subdivision is divided into an eastern portion (from Mile 0.0 to Mile 183.2) and a western portion (from Mile 183.2 to Mile 296.2). On the eastern portion of the Ruel Subdivision, a TSPVR and 2 ATSs were responsible for all maintenance activities, including the supervision of all related engineering maintenance personnel. One ATS was responsible for about 87 miles at the east end of the eastern portion,
29 J. Reason, Managing the Risks of Organizational Accidents (Ashgate, 1997), pp. 93–100.
Railway Investigation Report R15H0021 | 29
and the other ATS was responsible for about 97 miles at the west end of the eastern portion. Track maintenance personnel consisted of about 18 to 24 permanent employees during the summer. About 34 temporary employees were added during the winter. The TSPVR reported to the senior manager engineering (SME) for the Northern Ontario Zone. The SME was 1 of 4 CN SMEs within the province of Ontario and was responsible for a territory which included parts of the Bala, Caramat, and Newmarket Subdivisions, and all of the Ruel and Soo Subdivisions. The SME reported to 1 of 2 assistant chief engineers for CN’s eastern region, who in turn reported to the eastern regional chief engineering. 1.18 Track maintenance challenges on the Ruel Subdivision CN identified train velocity30 as an issue having significant influence on the use of assets and cost control, which are 2 of CN’s 5 strategic business pillars.31 All engineering employees understood the sense of urgency to move trains as quickly and as safely as possible. Train delays that affect velocity can create inter-functional pressures within the company. These pressures can sometimes create conflict between track maintenance decisions and train operations. Because of the importance of keeping trains moving, it can be challenging for track maintenance personnel to obtain adequate track time to conduct the required track inspection, maintenance, and repairs, particularly in a remote territory with limited road access. 1.19 Regulatory oversight TC promotes safe and secure transportation systems in the air, marine, rail, and surface modes, as well as the safe transportation of dangerous goods (DGs). To do so, TC develops safety regulations and standards, and, in the case of railways, it facilitates the development of rules by the rail industry. Once the rules are approved, TC is then responsible for enforcing the rules through a number of inspection programs to monitor compliance with rules and regulations. Track inspections are targeted using a risk-based approach. TC also has a national inspection program that randomly selects track segments to be inspected each year. Primary traffic corridors usually receive more attention than secondary main lines. Rail safety is governed by the Railway Safety Act, the objectives of which are to: (a) promote and provide for the safety and security of the public and personnel, and the protection of property and the environment, in railway operations; (b) encourage the collaboration and participation of interested parties in improving railway safety and security;
30 Train velocity is the ability to move trains to destination as quickly and safely as possible. (Source: Canadian National Railway Company, How We Work and Why.) 31 Ibid.
30| Transportation Safety Board of Canada
(c) recognize the responsibility of companies to demonstrate, by using safety management systems and other means at their disposal, that they continuously manage risks related to safety matters; and (d) facilitate a modern, flexible and efficient regulatory scheme that will ensure the continuing enhancement of railway safety and security.32 TC has also developed the Railway Safety Management System Regulations (SMS Regulations), which require railways to manage their safety risks. 1.20 Transport Canada regulatory track inspections TC railway engineering inspectors are tasked with conducting railway infrastructure inspections across Canada. Railway subdivisions are not necessarily subject to regular TC inspections. Instead, TC uses a risk-based approach that considers various factors to identify specific subdivisions or areas of subdivisions that require targeted inspection. TC prioritizes inspections by considering different operational factors, including but not limited to rail and geometry defects, number of passenger trains, operating speeds, and traffic tonnage. Emerging track conditions such as LSCs and REBs, which are not considered defects under the TSR, are not specifically considered as part of the risk-based approach. The TC inspection program has 3 components: • A-component inspections: TC Headquarters develops a national inspection plan for the following year using a statistical model, identifies the number of inspections, and targets companies that are to receive these inspections. • B-component inspections: TC regions focus on specific recurring issues requiring closer monitoring using a risk-based business planning process to identify the companies that are to receive these inspections. • C-component inspections: These are unplanned and respond to issues emerging through the year, such as derailments and ad hoc inspections. Using the national inspection plan, each TC region develops an operational plan to provide guidance to its rail safety inspectors on which companies, infrastructure locations, subdivision portions, operations, and maintenance employees to inspect. In TC’s Ontario Region, each functional group performs a risk assessment to rank the subdivisions, yards, and maintenance facilities according to risk. Factors considered include accident history, compliance with standards and regulations, changes in operations, amount and type of traffic, hours of work, type of work performed, previous TC and railway inspections, and maintenance history. A significant increase in overall freight or DG traffic may be considered but does not necessarily influence which subdivisions are scheduled for inspection. Because LSCs are considered to be a condition and are not recognized as a defect in the TSR, any increase in LSC volume may not necessarily be reviewed, despite LSCs being leading indicators of a deteriorating rail condition. From the risk assessment, the inspections are
32 Railway Safety Act (R.S.C. 1985, c. 42 (4th Supp.)), section 3.
Railway Investigation Report R15H0021 | 31
prioritized so that locations or railway activities that have higher risk are inspected in a timely manner. Table 4 summarizes the track inspections conducted by TC on the Ruel Subdivision since 2005. Table 4. Track inspections conducted by Transport Canada on the Ruel Subdivision, 2005 to 2015 Year From Mile To Mile 2005 148.3 223.5 2006 87 183 2007 0 86.7 2008 0 87 2010 87 127 2012 86 296
2013
2014
2015 (until February 2015)
Between 2013 and the date of the occurrence, TC did not perform any track inspections on the Ruel Subdivision because geometry defects appeared to be declining. Following the accident, between 15 March 2015 and 19 March 2015, TC inspected the entire Ruel Subdivision and identified 67 non-compliant conditions that required remedial action and 59 other concerns and observations. These conditions had likely evolved since the last TC regulatory inspection (in 2012) and had existed before the accident, yet went undetected despite regular railway inspection. 1.21 Other TSB investigations involving regulatory inspections Since May 2014, there have been 5 other TSB investigations where railway and/or TC inspections did not identify degrading track conditions, resulting in further deterioration of the track structure which ultimately led to a derailment (Appendix A). In 3 of the 5 occurrences, track joint or rail failure occurred in the immediate vicinity of pre-existing LSC or REB rail surface conditions which, although not condemnable, were being monitored at the time. 1.22 TSB safety issues investigation In response to a series of train derailments on secondary main lines involving broken rails in the winter of 2003–2004, the TSB carried out a safety issues investigation.33 The study established a significant relationship between rail defects and the level of bulk unit train 33 TSB Safety Issues Investigation Report SII R05-01, Analysis of Secondary Main-Line Derailments and the Relationship to Bulk Tonnage Traffic (2005).
32| Transportation Safety Board of Canada
traffic and found that the effect of increasing bulk train traffic had not been accommodated through regular maintenance. The same circumstances could also apply to mainline track. The study also identified that • Railways recognized that the rate of track degradation was accelerated with increases in bulk unit train tonnage. However, an appropriate balance between increased track degradation and timely infrastructure maintenance and/or renewal was not always achieved. • Compliance with the TSR in and of itself was insufficient to ensure safety since it did not provide a means to anticipate changing conditions such as increased traffic over the long term. • There was a need for more proactive safety management system (SMS) processes to anticipate operational conditions which could lead to a degradation of safety margins. 1.23 Safety Management System Regulations An SMS is “a systematic, explicit and comprehensive process for managing safety risks.”34 It is a means to ensure that a railway has the processes in place to identify the hazards in its operation and mitigate the risks. SMS was designed around evolving concepts about safety that are believed to offer great potential for more effective risk management. SMS was progressively introduced in the Canadian transportation industry because this approach to regulatory oversight, which seeks to ensure that organizations have processes in place to manage risks systematically, when combined with inspections and enforcement, is considered to be more effective in reducing accident rates. Section 2 of the TC Safety Management System Regulations (2001) (the SMS Regulations), which were in force at the time of the accident,35 states:
- A railway company shall implement and maintain a safety management
system that includes, at a minimum, the following components:
(a) the railway company safety policy and annual safety performance targets and the associated safety initiatives to achieve the targets, approved by a senior company officer and communicated to employees;
(b) clear authorities, responsibilities and accountabilities for safety at all levels in the railway company;
(c) a system for involving employees and their representatives in the development and implementation of the railway company’s safety management system;
(d) systems for identifying applicable
34 Transport Canada, TP 15058E, Railway Safety Management Systems Guide: A Guide for Developing, Implementing and Enhancing Railway Safety Management Systems (November 2010), p. 3, at http://publications.gc.ca/site/eng/9.694086/publication.html (last accessed on 06 June 2017). 35 The Railway Safety Management System Regulations, 2015 came into force on 01 April 2015.
Railway Investigation Report R15H0021 | 33
(i) railway safety regulations, rules, standards and orders, and the procedures for demonstrating compliance with them, and
(ii) exemptions and the procedures for demonstrating compliance with the terms or conditions specified in the notice of exemption;
(e) a process for
(i) identifying safety issues and concerns, including those associated with human factors, third-parties and significant changes to railway operations, and
(ii) evaluating and classifying risks by means of a risk assessment;
(f) risk control strategies;
(g) systems for accident and incident reporting, investigation, analysis and corrective action;
(h) systems for ensuring that employees and any other persons to whom the railway company grants access to its property, have appropriate skills and training and adequate supervision to ensure that they comply with all safety requirements;
(i) procedures for the collection and analysis of data for assessing the safety performance of the railway company;
(j) procedures for periodic internal safety audits, reviews by management, monitoring and evaluations of the safety management system;
(k) systems for monitoring management-approved corrective actions resulting from the systems and processes required under paragraphs (d) to (j); and
(l) consolidated documentation describing the systems for each component of the safety management system. 36 The SMS Regulations also require railway companies to • maintain records to permit the assessment of safety performance (subsection 3(1)); • submit documentation and records to the Minister that demonstrate compliance with the regulations (subsection 4(1)); and • produce safety management documentation upon request (section 6). 1.24 Canadian National Railway Company’s safety management system In accordance with the SMS Regulations, CN had developed and implemented a detailed SMS. Since 2008, CN’s SMS had been enhanced each year and had been integrated into most facets of its operations. The SMS described company initiatives that correlate to the requirements of section 2 of the SMS Regulations.
36 Transport Canada, Railway Safety Management System Regulations (SOR/2001-37), section 2, available at http://laws-lois.justice.gc.ca/eng/regulations/SOR-2001- 37/20060322/P1TT3xt3.html (last accessed on 06 June 2017).
34| Transportation Safety Board of Canada
With regard to paragraph 2(e) of the SMS Regulations that were in force at the time of the occurrence, CN had implemented systems for • identifying safety issues and concerns, including those associated with human factors, third-parties and significant changes to railway operations; • evaluating and classifying risks by means of a risk assessment; and • identifying and implementing risk control strategies. Specific actions included the following: • Safety issues and concerns were flagged to CN management through hazard forms, health and safety committees, CN’s Ombudsman and CN’s Prevent Hotline (a joint venture with Saint Mary’s University, Halifax, Nova Scotia), as well as through audits and trend analyses. • CN had a formal risk assessment process that was used to evaluate and classify risks, including those associated with significant changes in railway operations, such as the opening of new yards and facilities, railway acquisitions, introduction of new technology, significant changes in business (volumes or product), and changes in personal protective equipment. • Special corridor risk assessments were being carried out to assess and reduce risk in locations with high populations, waterways, or other environmental or topographical characteristics. • Training was being provided to employees who performed risk assessments. When human factors may have played a role in an accident, CN required further investigation before formulating corrective action, and the following was typically considered: • Was the work properly planned, organized and supervised? • Was the employee properly trained and equipped? • Did the employee have the opportunity for sufficient rest? • Was the rule or work procedure well understood?37,38 Despite having a formal risk assessment process, CN perceived the increased tonnage of crude oil shipments on the Ruel Subdivision during the 2014 year as a normal operating parameter. The increase in tonnage did not trigger CN to conduct a risk assessment or to review an existing one.
37 Canadian National Railway Company, “CN SMS & Safety Culture,” presentation to the Advisory Council on Railway Safety (17 February 2015). 38 Canadian National Railway Company, Leadership in Safety: Looking out for each other 2015: An Overview of CN’s Safety Management System (2015).
Railway Investigation Report R15H0021 | 35
- 25 Safety culture
Safety culture can be defined as “shared values (what is important) and beliefs (how things work) that interact with an organization’s structures and control systems to produce behavioral norms.”39 Safety culture is critical to effective safety management, because safety management processes will be ineffective in a culture that does not support the proactive sharing of safety information. Where a safety culture exists to support effective safety management, information pertaining to safety will be actively sought; employees will be trained to recognize hazards and rewarded for sharing safety concerns. In such a culture, failures will be scrutinized as an opportunity to learn, and new ideas will be welcomed.40 An effective safety culture is critical to the processes required by an SMS that support the development of a resilient organization. TC’s SMS guidance document Rail Safety Management Systems Guide: A Guide for Developing, Implementing and Enhancing Railway Safety Management Systems states that: An effective safety culture in a railway company can reduce public and employee fatalities and injuries, property damage resulting from railway accidents, and the impact of accidents on the environment. In simple terms, an organization’s safety culture is demonstrated by the way people do their jobs—their decisions, actions and behaviours define the culture of an organization. The safety culture of an organization is the result of individual and group values, attitudes, perceptions, competencies and patterns of behaviour that determine the commitment to, and the style and proficiency of, an organization’s health and safety management system. Organizations with a positive safety culture are characterized by communications from various stakeholders founded on mutual trust, by shared perceptions of the importance of safety and by confidence in the efficacy of preventive measures. 41 The relationship between safety culture and safety management is reflected in part by the beliefs, attitudes, and behaviours of a company’s management. An effective safety culture includes proactive actions to identify and manage operational risk. It is characterized by an informed culture where people understand the hazards and risks involved in their own operation and work continuously to identify and overcome threats to safety. It is a just culture, where the workforce knows and agrees on what is acceptable and unacceptable. It is a reporting culture, where safety concerns are reported and
39 J. Reason, Managing the Risks of Organizational Accidents (Ashgate, 1997), p. 192. 40 Originally from Westrum (1992), described in Reason (1997), Managing the Risks of Organizational Accidents, Ashgate. 41 Transport Canada, TP 15058E, Rail Safety Management Systems Guide: A Guide for Developing, Implementing and Enhancing Railway Safety Management Systems (November 2010), section 5, available at http://publications.gc.ca/site/eng/9.694086/publication.html (last accessed on 06 June 2017)
36| Transportation Safety Board of Canada
analyzed and where appropriate action is taken. Finally, it is a learning culture, where safety is enhanced from lessons learned.42 A company’s policies determine how safety objectives will be met by clearly defining responsibilities; by developing processes, structures and objectives to incorporate safety into all aspects of the operation; and by developing the skills and knowledge of personnel. Procedures are directives for employees and communicate management’s instructions. Practices are what really happens on the job, which can differ from procedures and, in some cases, increase threats to safety. 1.26 Safety culture at Canadian National Railway Company In parallel with implementing SMS, CN had recognized the importance of building an effective safety culture which the company considered essential for SMS. To help strengthen its safety culture, CN has invested in training, coaching, and employee recognition and involvement. In October 2014, CN co-hosted a safety culture symposium in Halifax, Nova Scotia, during which participants discussed and shared information on safety culture. CN also hosted a number of safety summits throughout its regions to promote two-way communication and best safety practices. In 2014, among other initiatives, CN developed and implemented Looking Out for Each Other, a strategy that has become an integral part of CN‘s safety culture. The peer-to-peer engagement strategy was designed to • raise awareness among employees of the top causes of incidents and injuries; • identify and review safe work procedures; • train employees to be aware of their surroundings and to recognize potential at-risk work practices or situations in the field; • teach employees how to provide constructive feedback to peers; and • learn from past incidents to prevent a reoccurrence of the same event and help each other stay safe.43 1.27 Resilience: The safe operating envelope and requisite imagination Resilience is generally defined as the ability to “withstand or recover quickly from difficult conditions.”44 A resilient organization or system is defined as being “able to effectively adjust its functioning prior to, during or following changes and disturbances, so that it can
42 Transport Canada, TP 13739, Introduction to Safety Management Systems (April 2001). 43 Canadian National Railway Company, Leadership in Safety: Looking out for each other 2015: An Overview of CN’s Safety Management System (2015). 44 “Resilience,” The Oxford English Dictionary, 10th ed. (New York: Oxford University Press, 2002).
Railway Investigation Report R15H0021 | 37
continue to perform as required after a disruption or a major mishap, and in the presence of continuous stresses.”45 Four cornerstones common to resilient organizations have been identified. The ability to adjust and adapt requires the organization to respond to events, monitor key change indicators, anticipate long term challenges and learn from experience. With these cornerstones in place, a resilient organization will • know what to do (how to respond to regular events) • know what to look for (how to monitor for potential problems) • know what to expect (anticipating potential threats) • know what has happened (having the right indicators to learn from experience). 46 These abilities help organizations balance potentially competing safety, efficiency, and workload pressures relevant to the operating environment. An organization that is monitoring, anticipating, and learning effectively through proactive safety management processes and leading safety indicators will be able to respond to competing pressures and maintain an acceptable level of risk. Being poorly equipped to detect and understand the significance of small changes in the operating environment will increase risk until lagging indicators such as accidents or serious incidents provide clear indications that the system is out of balance. One of the challenges is that safety reserves (procedures and practices that help maintain an acceptable margin of safety) can experience pressure from competing demands to increase efficiency. Mistaking safety reserves for inefficiencies will undermine safety goals.47 Balancing competing demands is a challenge for individuals at all levels of an organization, because safety issues can emerge slowly and be difficult to detect. The human capability to appreciate the significance of information and events and to anticipate their impact on safety has been termed “requisite imagination.” Developing requisite imagination relies on individuals within the organization having • expert track knowledge allowing anticipation and judgement of defect conditions; • the will to think critically about the functioning of the system; • effective training to develop these capabilities; • sufficient spare capacity to respond to events; and
45 E. Hollnagel, “The Four Cornerstones of Resilience Engineering,” in: C.P. Nemeth, E. Hollnagel and S. Dekker (eds.), Resilience Engineering Perspectives, Volume 2: Preparation and Restoration (CRC Press, 2009), p. 117. 46 Ibid., p. 120. 47 D. Woods, J. Schenk and T.T. Allen, “An Initial Comparison of Selected Models of System Resilience,” in: C.P. Nemeth, E. Hollnagel and S. Dekker (eds.), Resilience Engineering Perspectives, Volume 2: Preparation and Restoration (CRC Press, 2009), p. 82.
38| Transportation Safety Board of Canada
• a clear flow of information throughout the organization.48 A comprehensive SMS would help an organization develop requisite imagination by ensuring that it has processes in place to support the 4 cornerstones of resilience, including • effective procedures for normal and abnormal situations (responding) • safety reporting and trend analysis (monitoring) • risk identification and assessment (anticipating) • incident investigation (learning). “Proactive safety management helps organizations look ahead to notice the signs that risks are changing or increasing despite past records of success and increasing pressures for short term performance.”49 An effective safety culture is essential in order to realize the benefits of requisite imagination. The safety culture of an organization will largely determine the type and amount of information fed into safety management processes, and how such information will be received and addressed. 1.28 Significant accidents involving Class 111 tank car releases There have been a number of occurrences in Canada and the U.S. during which product was released from Class 111 tank cars following a collision, impact, and/or fire (Appendix B). These occurrences highlight the vulnerability of Class 111 tank cars to accident damage and product release. As of June 2015, about 270 000 Class 111 tank cars were in service in North America, of which about 141 000 were being used to transport DGs. 1.29 The Lac-Mégantic accident On 05 July 2013, at about 2250 Eastern Daylight Time, Montreal, Maine & Atlantic Railway (MMA) freight train MMA-002, en route from Montréal, Quebec, to Saint John, New Brunswick, was stopped at Nantes, Quebec (Mile 7.40 of the Sherbrooke Subdivision), the designated MMA crew-change point. The train, consisting of 5 head-end locomotives, 1 VB car (i.e., special-purpose caboose), 1 box car, and 72 Class 111 tank cars carrying flammable liquids (petroleum crude oil, UN1267, Class 3), was then secured on the main track and left unattended on a descending grade. Shortly before 0100 on 06 July 2013, the unattended train started to move, and gathered speed as it rolled, uncontrolled, down the descending grade toward the town of Lac- Mégantic, Quebec. After reaching a speed of 65 mph, 63 Class 111 tank cars and a box car derailed near the centre of the town. The derailed cars released approximately
48 R. Westrum, “Ready for Trouble: Two Faces of Resilience,” in: C.P. Nemeth, E. Hollnagel and S. Dekker (eds.), Resilience Engineering Perspectives, Volume 2: Preparation and Restoration (CRC Press, 2009) pp. 135–148. 49 D. Woods, J. Schenk and T.T. Allen, “An Initial Comparison of Selected Models of System Resilience,” in: C.P. Nemeth, E. Hollnagel and S. Dekker (eds.), Resilience Engineering Perspectives, Volume 2: Preparation and Restoration (CRC Press, 2009), p. 92.
Railway Investigation Report R15H0021 | 39
- 98 million litres of product due to tank car damage. The released product ignited almost
immediately, resulting in a large pool fire that burned for more than a day. Forty- seven people were fatally injured. Many buildings, vehicles, and the railway tracks were destroyed. About 2000 people were initially evacuated from the surrounding area. As part of the Lac-Mégantic investigation,50 the TSB highlighted the vulnerabilities of Class 111 tank cars and recommended that: The Department of Transport and the Pipeline and Hazardous Materials Safety Administration require that all Class 111 tank cars used to transport flammable liquids meet enhanced protection standards that significantly reduce the risk of product loss when these cars are involved in accidents. TSB Recommendation R14-01 1.30 Response from Transport Canada to TSB Recommendation R14-01 (February 2017) In February 2017, TC provided an updated response to Recommendation R14-01. TC indicated that: The new TC-117 regulation established the requirements for a new flammable liquid tank car standard (TC-117), retrofit requirements for older tank cars in flammable liquid service and implementation timelines to modernize the North American tank car fleet. The standards and timelines were generally harmonized with the US regulators (PHMSA and FRA). On 13 July 2016, the Minister of Transport issued Protective Direction (PD) 38, in accordance with the Transportation of Dangerous Goods Act, 1992. This PD further accelerates the phase-out of both jacketed and unjacketed legacy DOT- 111 tank cars from being used for crude oil service in Canada as of 01 November 2016. In October 2016, a planning session was held with respect to the feasibility of further accelerating the prescribed tank car phase-out schedule. TDG has been examining options to broaden the department’s scope of action in terms of the phase-out of DOT-111 and CPC-1232 tank cars. This will include: analyzing the state of the tank car industry; assessing whether sufficient tank cars exist in light of current demand for transporting flammable liquids by rail; recommending potential acceleration of the phase-out schedule where feasible, and developing an impact assessment. This will lead to recommendations on whether to further accelerate the tank car phase-out schedule introduced in May 2015 and ending in 2025. This feasibility study is expected to be completed by late 2017. Transport Canada continues to monitor closely the construction of new TC- 117 tank cars and the retrofitting of older flammable liquid tank cars.
50 TSB Railway Investigation Report R13D0054.
40| Transportation Safety Board of Canada
Transport Canada continues to study the possibility of further acceleration of the prescribed phase-out schedule. Transport Canada will collaborate with US DOT and industry in monitoring the flammable liquid tank car fleet. 1.31 Board assessment of Transport Canada response to TSB Recommendation R14-01 (March 2017) In March 2017, the Board assessed TC’s response to Recommendation R14-01. It was indicated that: This recommendation is related to the TSB Watchlist issue of “Transportation of flammable liquids by rail”, which was updated in 2016. The transportation of flammable liquids, such as crude oil, by rail across North America has created an elevated risk that needs to be mitigated effectively. Recommendation R14-01 is specific to new and existing Class 111 tank cars for the transportation of flammable liquids. Transport Canada’s new regulations modernizing the North American tank car fleet established a new tank car standard (TC-117) and prescribed retrofit requirements for older tank cars in flammable liquid service as well as implementation timelines. These were generally harmonized with the US regulators (PHMSA and FRA). In July 2016, TC issued Protective Direction 38 which accelerated the phase- out of legacy DOT-111 tank cars from crude oil service in Canada as of 01 November 2016. In October 2016, a planning session was held with respect to the feasibility of further accelerating the prescribed tank car phase-out schedule, involving both DOT-111 and CPC-1232 tank cars. This feasibility study is expected to be completed by late 2017. The Board acknowledges TC’s continued efforts to monitor the construction of new TC-117 tank cars and the retrofit of older tank cars in flammable liquid service. While there are no prescribed regulatory provisions requiring industry to provide detailed fleet retrofit progress data, TC is collaborating with the US DOT and industry to monitor the state of the tank car fleet in flammable liquid service. The Board is encouraged with the progress made to date on the phase-out of legacy tank cars in flammable liquid service and looks forward to a fleet status update following TC’s collaboration with the US DOT and industry. However, until all flammable liquids are transported in tank cars built sufficiently robust to prevent catastrophic failure when involved in an accident, the risks will remain. Therefore, the Board continues to call upon TC to ensure that risk control measures during the transition and phase-out are effectively managed. The Board considers Transport Canada’s response to Recommendation R14-01 as having Satisfactory Intent.
Railway Investigation Report R15H0021 | 41
- 32 Association of American Railroads Circular OT-55-N and TSB
Recommendation R14-02 In January 1990, based on recommendations of the Inter-Industry Task Force on the Safe Transportation of Hazardous Materials by Rail, the AAR issued Circular OT-55 (OT-55), entitled Recommended Railroad Operating Practices for Transportation of Hazardous Materials. OT- 55 provided the rail industry with routing guidance for selected dangerous goods, including poisonous-by-inhalation (PIH) and toxic-by-inhalation (TIH) products. Radioactive materials were added to OT-55 in August 2001. In addition, OT-55 identified the technical and handling requirements for key trains and key routes. Following the Lac-Mégantic accident, the definition of a key train was revised51 within OT- 55-N to include any train containing 1 or more cars of PIH or TIH material, such as anhydrous ammonia, ammonia solutions, spent nuclear fuel or high-level radioactive waste, or containing 20 carloads, or intermodal portable tank loads, of any combination of other hazardous materials. Although OT-55-N was not applicable in Canada, CN extended these measures to its Canadian operations in August 2013. As part of a company initiative, CN conducted risk assessments for subdivisions within corridors identified as key routes. As part of the investigation into the Lac-Mégantic accident, the TSB indicated that a similar approach based on OT-55-N, strengthened with a requirement to conduct route planning and analysis, would be a positive step to improve the safety of transporting DGs by rail for all railways in Canada. On 23 January 2014, the Board recommended that The Department of Transport set stringent criteria for the operation of trains carrying dangerous goods, and require railway companies to conduct route planning and analysis as well as perform periodic risk assessments to ensure that risk control measures work. TSB Recommendation R14-02 1.33 Response from Transport Canada to TSB Recommendation R14-02 (March 2017) In March 2017, TC provided an updated response to Recommendation R14-02. TC indicated that: Transport Canada has put in place a significant number of measures to improve railway safety including improved regulations regarding company’s safety management systems, regulations prescribing fines for contraventions to the Railway Safety Act, and a new liability and compensation regime for federally regulated railways.
51 Association of American Railroads (AAR), Circular No. OT-55-N (CPC-1258) (effective 05 August 2013).
42| Transportation Safety Board of Canada
Transport Canada issued an Emergency Directive under the Railway Safety Act in April 2014 which required railways carrying dangerous goods to implement minimum key operating practices, including speed restrictions for trains carrying dangerous goods, and the completion of risk assessments for rail transportation routes. In February 2016, Transport Canada approved the Rules Respecting Key Trains and Key Routes, which is a permanent rule for the safe transportation of dangerous goods by rail. This rule requires railway companies that operate key trains to not exceed 50 mph, and it places a further reduction on speed to a maximum of 40 mph for key trains operating in highly urbanized areas. For companies operating Key Routes, the rule expands requirements for inspection of track and requires defective equipment detectors. The rule also requires more robust Key Route risk assessments to be conducted at a minimum of every three years, based on minimum of 28 factors such as, volume and type of dangerous goods transported, population density along the route, and emergency response capability along the route. Self-reporting by railways has indicated that, for Class 1 railways (Canadian National and Canadian Pacific), 95% or greater of their core networks are Key Route miles. As part of their Key Route risk assessment, railway companies are required to identify, evaluate and compare alternative routes over which the company has the authority to operate. In addition, the rule requires companies to incorporate input from municipalities and other local governments into their risk assessments. Transport Canada’s oversight activities include monitoring the safety of railway companies’ operations, as well as compliance with rules, regulations and standards through audits and inspections, and taking appropriate enforcement action as required. Oversight of the new rules has been integrated into the oversight plan and continues to be an area of priority. The requirements for risk assessment in the rule are complementary to the Railway Safety Management System Regulations, 2015 (SMS Regulations) which came into force on 01 April 2015. The SMS Regulations require a railway company to conduct a risk assessment when it has a change in operations which may affect the safety of the public or personnel or the protection of property or the environment. The following are considered circumstances requiring a risk assessment under the SMS regulation: beginning to transport dangerous goods, transporting dangerous goods different from those already carried, increasing the volume of dangerous goods carried, or changing the route on which dangerous goods are transported. The risk assessment process must describe the risks, identify remedial actions, and evaluate the effectiveness of remedial actions. Transport Canada inspectors can use a variety of tools to address non- compliance. On 01 April 2015, new Administrative Monetary Penalty Regulations came into force under the Railway Safety Act. Since then, Railway Administrative Monetary Penalties (fines) have been issued by Transport Canada for non-compliance. In its June 2014 assessment of TC’s response to recommendation R14-02, the TSB stated:
Railway Investigation Report R15H0021 | 43
The Emergency Directive will require risk assessments to be conducted on key routes over which key trains operate. However, key routes are defined as a route over which 10,000 car loads of dangerous goods are transported annually. This threshold may limit the number of routes subject to these enhanced safety measures. A rigorous analysis should be conducted of the 10,000-car threshold to determine which routes will be excluded and whether the safety deficiency identified in R14-02 will be addressed. In response to this assessment, TC committed that it would review the 10,000 car loads threshold to define Key Routes. TC and the National Research Council Canada recently completed a study which included scientific and engineering analysis to connect the volume of dangerous goods transported (in terms of car loads) in the context of risk factors within the Canadian rail network (such as railway infrastructure conditions, operation and maintenance practices) correlated with traffic volumes, and potential consequences to safety of population exposed along the route, the environmental consequences to waterways and parklands, as well as the economic consequences to rail transportation in Canada. The study illustrated that risk is influenced by more than the number of car loads of dangerous goods which are carried. Other factors such as operating and maintenance practices of railways, infrastructure conditions, as well as population density and environmental conditions along the route also strongly influence risk. At the current volume of dangerous goods being transported, the study found the impact of reducing the Key Route threshold was low. In the case of Class 1 railways (CN and CP), the majority of their mainline subdivisions are already Key Routes. Shortline railways generally transport an annual average of dangerous goods car loads much lower than 10,000. In addition, Class 1 railway subdivisions analyzed in the study have relatively flat safety risk gradients, meaning that based on current operating conditions, their risk level does not appear to increase or decrease by much with changes in volumes of dangerous goods transported. The study reinforced TC’s current risk-based approach to oversight by concluding that a targeted oversight approach, on an on-going basis, to identify subdivisions with the highest risk gradient and risk level, would be the most effective approach. Taking into account the outcomes of the study, the Department has decided the threshold for defining a key route will remain at 10,000 car loads in the Rule. Going forward, TC will incorporate outcomes from the study, with respect to identifying subdivisions with the highest risk gradient and risk level, to inform and enhance its oversight of railways operating Key Trains and Key Routes. Transport Canada has implemented a series of integrated measures that improve safety and reduce risk for the transportation of dangerous goods by rail. These measures respond to all aspects of Recommendation R14-02.
44| Transportation Safety Board of Canada
- 34 Board assessment of Transport Canada response to TSB
Recommendation R14-02 (March 2017) In March 2017, the Board assessed TC’s response to Recommendation R14-02. It was indicated that: This recommendation is related to the TSB Watchlist issue of “Transportation of flammable liquids by rail”. The transportation of flammable liquids, such as crude oil, by rail across North America has created emerging risks that need to be effectively mitigated. In February 2016, Transport Canada approved the Rules Respecting Key Trains and Key Routes, which is a permanent rule for the safe transportation of dangerous goods by rail. This rule requires railway companies that operate Key Trains to not exceed 50 mph, with a further speed reduction to a maximum of 40 mph for Key Trains operating in highly urbanized areas. This rule requires increased frequencies for rail flaw inspections and geometry inspections for some classes of track on Key Routes. In addition, there are enhanced joint bar inspection requirements for Key Routes. The rule also requires railways to install wayside defective bearing detectors on Key Routes, and to ensure that trains do not proceed more than 40 miles without a roller bearing inspection. About 95% of the core networks for Class 1 railways are Key Routes. Key Route risk assessments have been conducted and will be conducted every 3 years (at a minimum). These risk assessments considered 28 specific factors to assess the safety and risk for each Key Route. However, in conjunction with these assessments, railway companies should also proactively anticipate the impact of certain risk factors, such as the increase in traffic tonnage, the increased use of heavier rail cars and the potential for more rapidly degrading track structure. This approach will help ensure that track on Key Routes is maintained to the required standards and that the risk of track infrastructure failure is appropriately mitigated. As part of the Key Route reviews, the railways must also incorporate input from municipalities and other local governments into their risk assessments. Railway companies must then identify, evaluate and compare alternative routes over which the company has the authority to operate. The requirements for the Key Route risk assessments are complementary to the Railway Safety Management System Regulations, 2015 (SMS Regulations) which came into force on 01 April 2015. Circumstances requiring a risk assessment under the SMS regulation include: transporting dangerous goods different from those already carried, increasing the volume of dangerous goods carried, or changing the route on which dangerous goods are transported. TC recently completed its study to determine the appropriate threshold criteria on key routes. The study indicated that risk is influenced by more than the number of car loads of dangerous goods carried. Other factors that were found to influence risk included operating and maintenance practices of railways, infrastructure conditions, population density, and environmental conditions along the route. As such, TC decided that the threshold for
Railway Investigation Report R15H0021 | 45
defining a Key Route will remain at 10,000 car loads. TC believes that the study outcome reinforces its risk-based approach to oversight and that identifying subdivisions with the highest risk gradient and risk level is the most effective approach. TC will use the outcomes from the study to help identify the subdivisions with the highest risk levels in order to enhance its oversight of railways operating Key Trains and Key Routes. Moreover, TC had previously indicated that, through its risk-based planning process, it would review all federally regulated railways to identify those that transport crude oil, but do not meet the 10,000 car load threshold on their routes. Through this risk-based approach, TC would assign appropriate resources to further monitor these railway operators. TC’s national oversight plan includes a dedicated inspection program for railways operating Key Trains, including those that do not meet the 10,000 car load threshold. TC’s risk-based planning process should ensure that all federally regulated shortline railways are assessed for risk and are appropriately monitored with respect to route planning and analysis. However, this process must also ensure that any future increases in the volumes of crude oil being transported by shortline railways are considered and that any necessary adjustments are made to the risk-based approach. The Board acknowledges TC’s progress on a number of integrated measures relating to route planning and analysis for trains transporting dangerous goods. However, some TSB investigations have shown that railway companies have not always effectively managed the emerging risks to railway infrastructure associated with transporting increased volumes of dangerous goods. The Board reassesses TC’s response to Recommendation R14-02 as having Satisfactory Intent. 1.35 Census metropolitan area A census metropolitan area (CMA), as defined by Statistics Canada, is an area of one or more neighbouring municipalities situated around a core. A CMA has a total population of at least 100 000, of which 50 000 or more live in the core. A census agglomeration (secondary core) has a population of at least 10 000. Most CMAs are geographically located on a major rail line. According to Statistics Canada: • The population of Canada was about 36 286 400 as of 2016. • The town of Lac-Mégantic had a population of 5932 people (2011 census). • The town of Gogama had a population of 277 people (2011 census). • In 2016, there were 33 cities that met the criteria of a CMA, with a combined total population of 25 164 200. This represents about 69% of the Canadian population (Appendix C).
46| Transportation Safety Board of Canada
- 36 Rules Respecting Key Trains and Key Routes
In response to TSB Recommendation R14-02, in April 2014, TC issued MO 14-01 which defined criteria used for identifying key trains and key routes and required railways to • formulate rules respecting the safe and secure operations of trains carrying certain dangerous goods and flammable liquids; • govern the route and speed of any key train to 50 mph or lower, including but not limited to a further speed restriction to 40 mph or lower for any key train transporting one or more Class 111 loaded tank cars containing a number of selected DGs, which included petroleum crude oil and petroleum distillates, in areas identified as higher risk through a risk assessment process; and • conduct risk assessments and periodic updates based on significant change to determine the level of risk associated with each key route over which a key train is operated. The MO was reissued a number of times to provide time for consultation and the development of industry rules. Once the rules were finalized, the MO was lifted. The Rules Respecting Key Trains and Key Routes were approved by TC and came into effect in February 2016. Subsections 4.1 and 4.2 of the rules read as follows: 4.1 Companies must restrict Key Trains to a maximum speed of 50 miles per hour (MPH). Companies must further restrict Key Trains to a maximum speed of 40 MPH within the core and secondary core of Census Metropolitan Areas. 4.2 Companies must restrict Key Trains transporting one or more DOT-111 loaded tank cars containing UN1170 ETHANOL, UN1202 DIESEL FUEL, UN1203 GASOLINE, UN1267 PETROLEUM CRUDE OIL, UN1268 PETROLEUM DISTILLATES, N.O.S., UN1863 FUEL, AVIATION, TURBINE ENGINE, UN1993 FLAMMABLE LIQUID, N.O.S., UN3295 HYDROCARBONS, LIQUID, N.O.S., UN1987 ALCOHOLS N.O.S., UN3494 PETROLEUM SOUR CRUDE OIL, FLAMMABLE, TOXIC or UN3475 ETHANOL AND GASOLINE MIXTURE to a maximum speed of 40 MPH in areas identified as higher risk through the risk assessment process as required under item 6 of this Rule. The DOT-111 tank cars include those that are CPC-1232 specification.[52] With respect to the speed restriction of 40 mph for a unit train hauling Class 3 flammable liquids, no detailed engineering analysis had been performed to assess the effect of the speed reduction on the severity of a derailment.
52 Transport Canada, Rules Respecting Key Trains and Key Routes (12 February 2016), subsections 4.1 and 4.2.
Railway Investigation Report R15H0021 | 47
- 37 Canadian National Railway Company corridor risk assessment
On 23 June 2014, in compliance with MO 14-01, CN submitted a risk assessment to TC for the transport of DGs on the Winnipeg–Toronto Key Route. The risk assessment evaluated each subdivision on the territory to assess areas of vulnerability in terms of • preventing an occurrence (i.e., coverage of wayside inspection systems); • the potential consequences associated with an occurrence (i.e., proximity to population centres and environmentally sensitive areas); and • the ability to respond to an occurrence (i.e., locations of personnel and materials to respond to a spill). With respect to the Ruel Subdivision, most of the required mitigations identified by the corridor risk assessment were related to the ability to respond to an emergency involving DGs, such as the need for caches of response equipment on the territory and the need to evaluate contractor coverage for emergency response. Similarly, the risk assessment took into consideration key trains that haul Class 2.3 DGs (Toxic Gases) as well as train movements where 20 or more loaded tank cars or loaded intermodal portable tanks containing DGs are shipped. The risk assessment process for the corridor assessment did not take current or projected future track conditions into consideration. The risk assessment also did not anticipate the increase in the transport of crude oil or the impact of the increased tonnage on the ability to maintain adequate infrastructure safety margins. CN has processes in place to identify track infrastructure maintenance requirements. For example, rail traffic volumes and detailed track defect analyses are used to identify the need for upgrades through a capital program. This review was typically undertaken during CN’s planning processes by its Engineering Department. However, the information was not integrated into the corridor risk assessment, nor was it required to be. Despite these measures, the track conditions on the Ruel Subdivision had continued to deteriorate. 1.38 Factors affecting the severity of derailment of tank cars carrying hazardous materials A 1992 study entitled Hazardous Materials Car Placement in a Train Consist reviewed a number of National Transportation Safety Board (NTSB) derailment investigations and Federal Railroad Administration (FRA) train accident data. At the time of the study, unit trains of Class 3 flammable liquids were virtually non-existent, and Class 111 tank cars were limited to a gross rail load (GRL) capacity of 263 000 pounds. No unit DG trains were included in the study. The study concluded (in part) that:
- Railroad accident data confirms that, on the average, more cars are
derailed in longer trains. To enhance hazmat transportation safety, hazmat cars should therefore be handled in somewhat shorter trains, even though it is recognized that this will result in more trains and possibly increased
48| Transportation Safety Board of Canada
exposure. Exposure is, of course, route dependent and must be assessed accordingly.
- Railroad accident data also confirms that, on the average, more cars are
derailed in trains at higher speeds. Hazmat cars should therefore be handled at somewhat more restricted speeds. Modest speed reductions may not necessarily result in increased exposure. This is again route dependent.[53] While not referenced specifically in the study, the weight of the cars involved in any derailment would also contribute to the severity of the accident. Other more recent studies, summarized in 2014, 54 have shown that the number of cars derailed is influenced by accident cause, train speed, train length, and point of derailment within a train. Specifically, broken rails result in more cars derailing than any other accident cause; higher-speed derailments result in more cars derailed; longer trains have more cars derail; and the closer a derailment occurs to the front of a train, the more cars derail. 1.39 Canadian National Railway Company derailment at Gladwick, Ontario, on 14 February 2015 On 14 February 2015, at about 2335, CN crude oil unit train U70451-10 was proceeding eastward at about 38 mph on CN’s Ruel Subdivision when it experienced a train-initiated emergency brake application at Mile 111.7, at Gladwick, Ontario. A subsequent inspection determined that the 7th through 35th cars (29 DG tank cars in total) had derailed. The train was travelling at 38 mph at the time of the accident. Of the 29 derailed tank cars, 19 were breached and about 1.7 million litres of product were released to either atmosphere or surface. The product ignited, and fires burned for 5 days. About 900 feet of mainline track was destroyed. There was no evacuation, and there were no injuries. Additional information about this derailment is presented in Appendix A. 55 TSB safety concern regarding speed of unit trains transporting Class 3 flammable 1.39.1 liquids As part of the TSB investigation into the Gladwick derailment, it was determined that the speed of the petroleum crude oil unit train increased the severity of the outcome. Consequently, the Board issued the following safety concern: The derailment occurred at a speed that was less than the 40 mph speed restriction required by TC’s ministerial order in place at the time of the
53 R.E. Thompson, E. R. Zarnejc and D.R. Ahlbeck, DOT/FRA/ORD-92118.1, Hazardous Materials Car Placement In A Train Consist, Volume I: Review and Analysis (Washington, DC: United States Department of Transportation, June 1992), section 6.2: Conclusions/Recommendations, p. 144. 54 Xiang Liu, Mohd Rapik Saat and Christopher P.L. Barkan, “Probability analysis of multiple-tank- car release in railway hazardous materials transportation,” Journal of Hazardous Materials, Volume 276 (15 July 2014), pp. 442–451. 55 TSB Railway Investigation Report R15H0013.
Railway Investigation Report R15H0021 | 49
accident and by the current Rules Respecting Key Trains and Key Routes. Given the severity of the outcome in this and other occurrences, the Board is concerned that a speed restriction of 40 mph may not be sufficient for some key trains, particularly unit trains transporting Class 3 flammable liquids in tank cars that do not meet the TC-117 standard. TSB recommendation relating to maximum speed for trains transporting dangerous 1.39.2 goods As part of the TSB investigation into the Gladwick derailment, the Board issued a recommendation relating to the factors that increase the severity of derailments involving dangerous goods, including train speeds for various train risk profiles. The investigation report indicated that TC had recognized the role that train speed and train risk profile play in severity of the outcome of a derailment, and had put some measures in place to limit the speed of “key trains” under certain conditions. The TC-approved Rules Respecting Key Trains and Key Routes restrict “key trains” to a maximum speed of 40 mph within the core and secondary core of CMAs. Although the restrictions contained in the rules were a step forward at the time issued, the current maximum speed of 40 mph was selected without being validated by any engineering analysis. Therefore, the Board recommended that: The Department of Transport conduct a study on the factors that increase the severity of the outcomes for derailments involving dangerous goods, identify appropriate mitigating strategies including train speeds for various train risk profiles and amend the Rules Respecting Key Trains and Key Routes accordingly. TSB Recommendation R17-01 Response from Transport Canada to TSB Recommendation R17-01 (May 2017) 1.39.3 In May 2017, TC provided a response to Recommendation R17-01. TC indicated that: Transport Canada acknowledges the recommendation and will conduct a literature review of existing studies, beyond those the department has already reviewed. This may provide additional analysis of speed and other factors which can directly influence the severity of the outcomes of the derailment of trains carrying dangerous goods. The results of this literature review will be used to determine whether additional scientific and engineering analysis would be meaningful to further the department’s understanding of factors affecting the severity of derailments to determine whether changes are warranted to the Rules Respecting Key Trains and Key Routes. Board assessment of Transport Canada response to TSB Recommendation R17-01 1.39.4 (July 2017) In July 2017, the Board assessed TC’s response to Recommendation R17-01 as follows: Transport Canada has acknowledged this recommendation.
50| Transportation Safety Board of Canada
[…] The Board notes that, although no timeline has been proposed, TC has committed to conducting a literature review of existing studies and to assessing the results of the review. However, beyond this commitment, there are no explicit plans for TC to conduct its own study on derailment severity factors. Therefore, the Board assesses the response to Recommendation R17-01 to be Satisfactory in Part. 1.40 TSB laboratory examination of failed rail components The following recovered rail components were subjected to detailed examination: • A section of rail removed 3 days before the accident during the repair of a broken thermite weld in the south rail. • A section of rail containing the east joint of the plug rail, with joint bars still holding together a section of plug rail and a fractured 20-inch-long section of parent south rail. Most of the rail head of the 20-inch section had broken off. Only a 4-inch-long piece of the rail head was recovered. Figure 14 shows a schematic of the recovered rail pieces as they were originally located in the track.
Railway Investigation Report R15H0021 | 51
Figure 14. Schematic of the rail pieces in the occurrence track. Recovered sections of rail are shown with bold outlines. Tie location and spacing are for illustration purposes only and not to scale
Original thermite weld failure 1.40.1 Examination of the original break at the thermite weld on the east end of the removed parent rail revealed a VSH defect in the rail head similar to the VSH defect observed in the east end joint parent rail (Figure 15). The VSH defect had propagated through the thermite weld from the original east parent rail to the west parent rail before the original rail break and plug rail repair. During the plug rail repair, the parent rail was cut, but there was no record of non-destructive dye penetrant testing being performed on the cut rail ends. Had a dye penetrant inspection been performed, VSH indications would likely have been observed in the east cut rail end, and more of the east parent rail may have had to be removed. Figure 15. Photograph of thermite weld on the east end of the removed parent rail with vertical split head defect in the rail head
52| Transportation Safety Board of Canada
With a section of the east parent rail that contained a VSH defect left in service, the defect eventually propagated to failure. Section of rail containing the east end parent rail 1.40.2 A 20-inch section of east parent rail that had failed inside the joint and a section of the plug rail are shown as received in Figure 16. Although no rail markings were present, the east parent rail section was identified as 136- pound rail manufactured by Sydney Steel in 1993. Figure 16. A 20-inch section of east parent rail that had failed inside the joint and a section of the plug rail within the east joint as received
It was determined that: • For the recovered rail, all head wear measurements were within CN specifications for rail wear. • The hardness of the removed parent rail was within specification. • A chemical analysis of a sample from the east parent rail met the current CN specifications for standard rail. • The east parent rail had a region of horizontal web fracture between the joint bars and a web/base fracture east of the joint bar ends. The web fracture surface displayed pounding damage that indicated that this fracture occurred prior to the final rail failure and had remained in track for some time before the occurrence. • When the joint bars were removed, there were no indications of movement within the joint that could have contributed to the rail break. • The 4-inch recovered section of east parent rail head was found to mate with the horizontal web fracture. The rail head contained a VSH defect (Figure 17).
Railway Investigation Report R15H0021 | 53
Figure 17. View of vertical split head in fragment of recovered 4-inch- long section of the east parent rail head
• The east parent rail material contained web streaking and centreline segregation (Figure 18). Although the extent of streaking and segregation did not exceed allowable limits, this type of microstructural defect is known to be conducive to the development of VSH defects. Figure 18. Rail cross-section taken 3 inches west of the thermite weld, with physical separation in the head and web streaking
• When the 20-inch section of east parent rail was placed on the same plane as the plug rail, the post-occurrence mismatch in head height measured 0.27 inch (6.75 mm) (Figure 19). For joints in Class 4 track, the allowable mismatch in rail head wear is 0.125 inch (3 mm).
54| Transportation Safety Board of Canada
Figure 19. Mismatch in head height between the east plug rail and the east parent rail
• The head wear measurements were ¼ inch (6.35 mm) for the west parent rail, 3/16 inch (4.8 mm) for the plug rail, and 3/8 inch (9.5 mm) for the east parent rail. The difference in pre-accident head height between the three rails was the head wear 3/16 inch (4.8 mm) difference between the higher plug and the lower east parent rail, which exceeded the allowable mismatch for Class 4 track. • When the plug rail was installed, the east end of the plug rail was ground down in an attempt to match the height of the parent rail. Post-occurrence measurements indicate that head grinding for a distance of about 2.5 inches (60 mm) from the end of the rail, combined with REB from the traffic over the joint after the repair, had reduced the overall height at the end of the rail by approximately 3/8 inch (9 mm). • The CN Welders Manual states that the maximum allowable difference in head height between two rails in a joint is 0.125 inch (3 mm) and that, if a difference in height exists, it should be corrected by grinding the high rail over a distance of 6 inches for every 0.01 inch of offset up to a maximum distance of 36 inches. The CN ETS have no clear guidance for grinding when a rail end mismatch occurs during plug rail repairs in CWR. • Although REB and post-fracture pounding on the horizontal web fracture likely contributed to the overall mismatch of 0.375 inch (9 mm) on the occurrence rails, the mismatch at the time of the repair was at least the maximum allowable and likely up to 0.265 inches (6.75 mm). Had a similar mismatch occurred in welded rail (thermite or flash butt welded rail), the transition to the higher rail would have had to be ground back 36 inches from the mismatch. • Prior to the plug rail repair, the east end parent rail, which also contained a VSH defect, was subjected to normal rolling stresses. After the repair, the dynamic loading created by rail wheels traversing the east end joint mismatch increased the local stresses on the east end parent rail. • The ground 2.5-inch transition zone was significantly shorter than required, resulting in an abrupt change in rail head height and increasing the dynamic stress applied to the rail head. This increase in stress created an environment where the pre-existing VSH defect in the east parent rail could propagate rapidly.
Railway Investigation Report R15H0021 | 55
- 41 Predicted wheel impacts on rail end mismatch
Discontinuities between rail ends at a joint create dynamic wheel-rail forces that can result in wear, deterioration, and early failure of track components. The Volpe National Transportation Systems Center has modelled approaches of varying complexity to estimate the dynamic wheel-rail force (the wheel impact force) at joints with steps or transitions (or ramps) of various sizes.56 The results of the Volpe study indicate that wheel impact force increases with increasing tread mismatch when a wheel encounters a step. For a given mismatch, the wheel impact force decreases as the ramp length increases. The wheel impact force also increases as speed increases, all other factors being constant. Representative examples of the predicted vertical wheel force response of a 286 000 pound GRL hopper car are shown in Table 5. The parameters used for the study were based on the maximum rail-end mismatch and speed permitted for each class of track defined by Title 49 of the Code of Federal Regulations, section 213.115 of the Federal Railroad Administration (FRA) Track Safety Standards. These classes of track are also consistent with the classes of track defined in the Track Safety Rules (TSR). Table 5. Examples of predicted dynamic vertical wheel force (Source: Volpe National Transportation Systems Center) Case Vertical rail- end mismatch (inch) Ramp length (inch) Speed (mph) Predicted dynamic vertical wheel force (kips) 1 0.125 (3.2 mm) 0 (step) 60 69.4 2 0.1875 (4.8 mm) 0 (step) 40 83.7 3 0.25 (6.3 mm) 0 (step) 25 97.6 4 0.25 (6.3 mm) 6 40 69.4 Each result represents a maximum safe combination of step height and speed. Therefore, a higher step height or shorter ramp length at a given speed (or a higher speed at a given mismatch condition) than those indicated in Table 5 would produce an unsafe wheel impact force condition. In this occurrence, the speed was 43 mph and the joint likely had a vertical mismatch of between 3/16 inch (4.8 mm), which was the initial mismatch, and 0.265 inch (6.75 mm), which was the mismatch measured in the TSB Engineering Laboratory. A 2.5 inch (60 mm) ramp had been ground to ease the head height transition. Thus, the vertical mismatch was at some point between Case 2 and Case 4 from the Volpe study.
56 B. Marquis and R. Greif, paper no. JRC2016-5734 “Dynamic Wheel-Rail Forces on Mismatched Joints with Ramps”, in: Proceedings of the 2016 Joint Rail Conference, Columbia, South Carolina, United States (12 to 16 April 2016).
56| Transportation Safety Board of Canada
Based on the predicted wheel impact of 97.6 kips from Case 3 with a ramp length of 0 (step), wheel impact estimates were calculated for the derailment speed of 43 mph, for 50 mph, and for the maximum Class 4 track speed limit of 60 mph. Table 6 summarizes the results of these calculations. Table 6. Wheel impact estimates calculated for various speeds and ramp lengths Vertical rail-end mismatch (inch) Ramp length (inch) Speed (mph) Estimated impact (kips) 0.25 (6.3 mm) 0 (step) 25 97.6 0.25 (6.3 mm) 0 (step) 43 142.1 0.25 (6.3 mm) 0 (step) 50 159.5 0.25 (6.3 mm) 0 (step) 60 184.2 0.25 (6.3 mm) 6 43 71.9 0.25 (6.3 mm) 6 50 77.8 0.25 (6.3 mm) 6 60 86.2 1.42 TSB testing of crude oil samples Table 7 provides a summary of the shipping information on the transportation of DGs pertinent to the tank cars in the occurrence train. Table 7. Tank car lading information Tank car location in train Shipping description under the Transportation of Dangerous Goods Act Information on safety data sheet Product identification number Proper shipping name Hazard class Packing group Product name Synonyms Manufacturer 1 to 94 UN1267 Petroleum crude oil 3 I Horizon sweet light oil Synthetic crude oil distillate; sweet light oil Canadian Natural Resources Ltd., Calgary AB The material safety data sheet (MSDS) for Horizon sweet light oil describes the product as a complex mixture of hydrocarbons derived from primary distillation of petroleum crude oil with an initial boiling point of less than 35°C and a flash point of less than −20 °C. Product samples (Figure 20) were taken from 2 representative non-derailed tank cars.57
57 The samples were collected from a stand-alone tank car using ASTM D4057 (spot samples). The pressure in each tank car was measured using a calibrated pressure gauge prior to the tank cars being vented to atmosphere and opened for collecting the samples.
Railway Investigation Report R15H0021 | 57
Figure 20. Oil samples from tank cars VMSX 310210 and VMSX 5177
The samples were collected on 16 March 2015 at the Valero refinery in Lévis, Québec, under the direction of a TSB investigator. Prior to the collection of samples, the tank car hatches were opened and a gas test was performed in the work environment around the hatch of each car using a portable multi-gas detector able to detect 6 gases. The test results indicated that the work environment was adequate to work in without respiratory protection. All crude oil samples were collected at atmospheric pressure. The samples were tested for characteristics relevant to the classification of the petroleum crude oil and to its behavior and effects during the post-accident spill and fire. The product samples were split and sent to 2 accredited external laboratories for testing. Table 8 lists the tests performed on each sample.
58| Transportation Safety Board of Canada
Table 8. Tests performed on product samples Parameter Test method Laboratory Flash point temperature ASTM D3828-12a Standard Test Methods for Flash Point by Small Scale Closed Cup Tester - Method B AITF Boiling point distribution ASTM D2887-14 Standard Test Method for Boiling Range Distribution of Petroleum Fractions by Gas Chromatography AITF ASTM D86-12 Standard Test Method for Distillation of Petroleum Products at Atmospheric Pressure Maxxam Density ASTM D5002-13 Standard Test Method for Density and Relative Density of Crude Oils by Digital Density Analyzer Maxxam Reid vapour pressure ASTM D323-15a Standard Test Method for Vapour Pressure of Petroleum Products (Reid Method) Maxxam Sulphur content ASTM D4294-10 Standard Test Method for Sulfur in Petroleum and Petroleum Products by Energy Dispersive X-ray Fluorescence Spectrometry Maxxam Viscosity ASTM D7042-14 Standard Test Method for Dynamic Viscosity and Density of Liquids by Stabinger Viscometer (and the Calculation of Kinematic Viscosity) Maxxam The test results for the occurrence product were compared to samples of similar products taken from tank cars at the Gladwick derailment (TSB Railway Investigation Report R13H0013), which occurred 3 weeks before this occurrence. Table 9 presents a comparative summary of the test results. Table 9. Comparison of test results for samples taken from products being transported in the Gogama (R15H0021) and Gladwick (R15H0013) occurrences Source Product identifier Total sulphur (mass %) Reid vapour pressure (kPa) Density (kg/m3) Viscosity (cSt) at temperature 20 °C 30 °C 40 °C Gogama derailment (R15H0021) 22.3 to 22.4 0.094 24.6 to 24.7 847.8 to 848.8 18.42 to 18.75 6.010 to 6.100 3.580 to 3.626 Gladwick derailment (R15H0013)* 22.2 to 22.4 0.081 to 0.082 24.2 to 24.8 846.9 to 847.7 19.12 to 19.24 6.100 to 6.110 3.599 to 3.616
- TSB Engineering Laboratory report LP057/2015, Analysis of Crude Oil Samples, samples VMSX 310192 and
VMSX 310187. The product testing and comparisons revealed the following: • The occurrence product samples had low density (847.8 to 848.8 kg/m3), low total sulphur (0.094 mass %), and low viscosity (3.580 to 3.626 cSt at 20 °C). These results were nearly identical to those obtained for the Horizon sweet light oil product samples analyzed for the Gladwick occurrence (R15H0013). • The properties of the occurrence product were consistent with those of a light sweet synthetic crude oil distillate, with volatility generally comparable to that of the Bakken Shale crude oil involved in the Lac-Mégantic occurrence (R13D0054).
Railway Investigation Report R15H0021 | 59
• The initial boiling points obtained for the occurrence product samples using the ASTM D2887 method were 22.3 °C to 22.4 °C. The occurrence product samples met the federal regulatory criteria for a Class 3 flammable liquid in PG I. • The large quantities of spilled product and the properties of the spilled product (high volatility and low viscosity) contributed to the large post-derailment fire. 1.43 Tank car information Historically, most legacy Class 111 tank cars were built with a GRL capacity of 263 000 pounds. In the mid-1990s, the industry began moving towards a Class 111 tank car with a GRL capacity of 286 000 pounds. In the late 1990s, TC, the DOT, and the AAR established a number of requirements for tank car GRL to be increased to 286 000 pounds. The requirements included increased puncture resistance for the tank heads and shells, increased design loads, and enhanced protection of service equipment. These requirements were further incorporated into TC and AAR standards for tank cars with a GRL of 286 000 pounds. However, these requirements did not apply to the majority of Class 111 tank cars at the time, which had a GRL of 263 000 pounds. The next step was to address the cars with a GRL of 263 000 pounds. In 2011, the AAR CPC-1232 tank car standards were established. These standards incorporated a number of enhancements to all Class 111 tank cars built after 01 October 2011 for the transportation of petroleum crude oil and ethanol (Class 3 PG I or PG II). These enhancements included the construction of tank cars to 286 000 pound standards, protection of the service equipment on the top shell, the use of reclosing pressure relief devices (PRD), the use of normalized steel for tank shells and tank heads, an increased minimum thickness for all tank cars that were not jacketed and insulated, and at least ½-inch thick half-head shields. For Canada, the specifications applicable to tank cars built before December 2013 were listed in TC safety standard CAN/CGSB-43.147.58 For tank cars built after December 2013, TC TDG tank specification TP14877 applied.59 Other applicable specifications were Title 49 of the Code of Federal Regulations, paragraph 179.20060 for the U.S., and the industry Casualty Prevention Circular No. CPC-1232 standard.61
58 Section 5.14 of the Transportation of Dangerous Goods Regulations specifies that a means of containment manufactured, selected, and used in accordance with safety standard CAN/CGSB- 43.147, last amended July 2008, is a permitted means of containment for the transportation of Class 3, 4, 5, 6.1, 8, or 9 dangerous goods by rail or by ship. 59 Transport Canada, TP 14877, Containers for the Transport of Dangerous Goods by Rail (December 2013). 60 United States Code of Federal Regulations, Title 49, Part 179: Specifications for Tank Cars. 61 American Association of Railroads (AAR), Manual of Standards and Recommended Practices, Section C-III: Specifications for Tank Cars, M-1002 (10/2007), Chapter 2.7: Requirements for Cars Built for the Transportation of Packing Group I and II Materials with the Proper Shipping Name “Petroleum Crude Oil”, “Alcohols, n.o.s.”, and “Ethanol and Gasoline Mixture” (implemented September 2011).
60| Transportation Safety Board of Canada
TC later incorporated these requirements into the Regulations Amending the Transportation of Dangerous Goods Regulations (TC 117 Tank Cars) which allowed Class 111 tank cars constructed to CPC-1232 requirements to be used in the interim for transporting flammable liquids until the TC-117 tank car became mandatory. Following the Lac-Mégantic derailment (TSB Railway Investigation Report R13D0054), the rail industry believed that Class 111 tank cars constructed to the CPC-1232 standard would provide enhanced protection for Class 3 products compared to legacy Class 111 tank cars.62 A GRL capacity of 286 000 pounds is not solely limited to tank cars. Most types of freight cars can be built to a 286 000 pound GRL capacity. Various types of freight cars with 286 000 GRL capacity have been in operation for over 30 years, with more being added each year. Unit trains for commodities other than crude oil such as coal, grain and potash had been operating during that same time period, primarily in western Canada. Many of the freight cars in this service had a 286 000 pound GRL capacity. However, crude oil unit trains were relatively new, particularly in eastern Canada, having come into operation primarily since
- Between 2010 and 2014, there was a 30% increase in traffic on the Ruel Subdivision and
crude oil traffic accounted for 46% of this traffic increase. Crude oil unit train tank cars are usually loaded to 286 000 pounds. In comparison, mixed merchandise and intermodal trains generally transport freight cars that have a lower GRL capacity. In 2014, the average crude oil unit train measured approximately 6000 feet long and weighed about 13 000 tons, which is considered a heavy train relative to its length. In comparison, a 13 000 ton mixed merchandise or intermodal train would typically range from about 9000 feet to 12 000 feet long. Figure 21 identifies the primary components on a Class 111 (CPC-1232 compliant) tank car.
62 A Railway Supply Institute—Association of American Railroads Tank Car Safety Research and Test Project database suggests that CPC-1232 tank cars perform 25% to 50% better than DOT-111s with respect to conditional probability of release.
Railway Investigation Report R15H0021 | 61
Figure 21. General service Class 111 CPC-1232 tank car arrangement. On all tank cars involved in this occurrence, the pressure relief device for all tank cars involved in this occurrence was located inside of the top fitting protective housing
All 94 tank cars in the occurrence train were constructed for and owned by Valero, which was also the product shipper and consignee. The tank cars were loaded at the Pembina Redwater terminal facility in Redwater, Alberta, and were carrying product destined for Valero’s refinery in Lévis, Quebec. All of the derailed tank cars were built within 3 years prior to the occurrence by Trinity Tank Car Inc., manufactured to U.S. DOT specification 111A100W1, and compliant with the industry’s CPC-1232 standard. The tank car heads and shells were made of AAR TC-128 Grade B normalized steel.63 All head shields were constructed of ½-inch thick ASTM A572 Grade 50 steel plate. The 9th, 14th, 19th, and 29th derailed tank cars were equipped with full head shields, jackets, and insulation. The remaining tank cars were non-jacketed, non-insulated and equipped with trapezoidal half-head shields. The tank cars were equipped with a 4-inch bottom outlet valve (BOV), top fittings (vacuum relief, 2-inch, and 3-inch ball valves) within a protective 20-inch multi-housing assembly, a hinged and bolted manway and a PRD. The PRD was fitted within the multi-housing assembly.
63 Normalization is a type of process used to improve ductility and toughness properties where the steel is heated slightly above its upper critical temperature and then is air cooled. This results in a more uniform, fine grained ferrite-pearlite structure.
62| Transportation Safety Board of Canada
Table 10. Summary of pertinent construction details of the 39 derailed tank cars Car location in train from head end* Tank car number Date certificate of construction approved Head/shell thickness (inch) Head shield Jacket and insulation Pressure relief device Start-to- discharge pressure (psig) Actual flow capacity** (scfm)*** 6 VMSX 310431 Feb-2013 1/2 Trapezoidal half shield None 75 27,000 7 VMSX 310442 Feb-2013 1/2 Trapezoidal half shield None 75 27,000 8 VMSX 311916 Feb-2013 1/2 Trapezoidal half shield None 75 27,000 9 VMSX 280513 Sep-2014 7/16 Full shield Steel jacket with 4-inch thick glass wool blanket 165 2,329 10 VMSX 310458 Feb-2013 1/2 Trapezoidal half shield None 75 27,000 11 VMSX 310238 Feb-2013 1/2 Trapezoidal half shield None 165 35,608 12 VMSX 310191 Feb-2013 1/2 Trapezoidal half shield None 165 35,608 13 VMSX 310040 Feb-2013 1/2 Trapezoidal half shield None 165 35,608 14 VMSX 5329 Aug-2012 7/16 Full shield Steel jacket with 4-inch thick glass wool blanket 165 2,329 15 VMSX 310725 Feb-2013 1/2 Trapezoidal half shield None 75 27,000 16 VMSX 311642 Feb-2013 1/2 Trapezoidal half shield None 75 27,000 17 VMSX 310828 Feb-2013 1/2 Trapezoidal half shield None 75 27,000 18 VMSX 310701 Feb-2013 1/2 Trapezoidal half shield None 75 27,000 19 VMSX 280501 Sep-2014 7/16 Full shield Steel jacket with 4-inch thick glass wool blanket 165 2,329 20 VMSX 310198 Feb-2013 1/2 Trapezoidal half shield None 165 35,608 21 VMSX 310225 Feb-2013 1/2 Trapezoidal half shield None 165 35,608 22 VMSX 310203 Feb-2013 1/2 Trapezoidal half shield None 165 35,608 23 VMSX 310285 Feb-2013 1/2 Trapezoidal half shield
None 75 27,000 24 VMSX 311704 Feb-2013 1/2 Trapezoidal half shield None 75 27,000
Railway Investigation Report R15H0021 | 63
Car location in train from head end* Tank car number Date certificate of construction approved Head/shell thickness (inch) Head shield Jacket and insulation Pressure relief device Start-to- discharge pressure (psig) Actual flow capacity** (scfm)*** 25 VMSX 311705 Feb-2013 1/2 Trapezoidal half shield None 75 27,000 26 VMSX 311699 Feb-2013 1/2 Trapezoidal half shield None 75 27,000 27 VMSX 311652 Feb-2013 1/2 Trapezoidal half shield None 75 27,000 28 VMSX 310343 Feb-2013 1/2 Trapezoidal half shield None 75 27,000 29 VMSX 28356 Mar-2013 7/16 Full shield Steel jacket with 4-inch thick glass wool blanket 165 2,329 30 VMSX 310341 Feb-2013 1/2 Trapezoidal half shield None 75 27,000 31 VMSX 310332 Feb-2013 1/2 Trapezoidal half shield None 75 27,000 32 VMSX 311640 Feb-2013 1/2 Trapezoidal half shield None 75 27,000 33 VMSX 310111 Feb-2013 1/2 Trapezoidal half shield None 165 35,608 34 VMSX 310302 Feb-2013 1/2 Trapezoidal half shield None 75 27,000 35 VMSX 310283 Feb-2013 1/2 Trapezoidal half shield None 75 27,000 36 VMSX 310297 Feb-2013 1/2 Trapezoidal half shield None 75 27,000 37 VMSX 310291 Feb-2013 1/2 Trapezoidal half shield None 75 27,000 38 VMSX 310888 Feb-2013 1/2 Trapezoidal half shield None 75 27,000 39 VMSX 311658 Feb-2013 1/2 Trapezoidal half shield None 75 27,000 40 VMSX 310219 Feb-2013 1/2 Trapezoidal half shield None 165 35,608 41 VMSX 311673 Feb-2013 1/2 Trapezoidal half shield None 75 27,000 42 VMSX 311692 Feb-2013 1/2 Trapezoidal half shield None 75 27,000 43 VMSX 310060 Feb-2013 1/2 Trapezoidal half shield None 165 35,608 44 VMSX 311681 Feb-2013 1/2 Trapezoidal half shield None 75 27,000 * Throughout the report, tank cars are identified by their position in consist number. ** Note that the required flow capacity differs for non-insulated, insulated, or thermally protected tank cars. *** Standard cubic feet per minute.
64| Transportation Safety Board of Canada
- 44 Site examination of derailed tank cars
Aerial photo-documentation of the derailment zone was performed before the post- derailment fire had been extinguished. Consequently, some of the derailment zone was obscured by smoke, which made it more difficult to document the site through aerial photographs. However, TSB investigators were able to examine the site and photograph most of the tank cars in situ while emergency responders dealt with the fire. Once the fire was extinguished, the remaining product was removed from the tank cars. The tank cars were then moved to a staging area for cleaning and purging in preparation for site examination. The tank cars were examined by CN, the TSB, and representatives of the tank car manufacturer. All of the derailed tank cars were in compliance with the specification requirement that was in effect at the time of their approval and construction. During the site examination, some test coupons of tank car material were collected from selected tank cars for metallurgical examination. The test coupons were sent to the TSB Engineering Laboratory for detailed examination. Tank car breaches 1.44.1 A total of 39 tank cars had derailed. The 6th car and 44th car had no damage. These 2 cars were re-railed and pulled away from the site during remediation operations. Field examination of the derailed tank cars was conducted for the 7th car to the 43rd car. Table 11 provides a summary of the type of breaches observed on the remaining 37 tank cars.
Railway Investigation Report R15H0021 | 65
Table 11. Summary of tank car breaches Car location in train from head end Reporting mark Type of breach Head Shell Top fittings and pressure relief device Manway Bottom outlet valve Thermal tear 7 VMSX 310442
Breach
8 VMSX 311916
9 VMSX 280513
10 VMSX 310458
Breach 11 VMSX 310238
Breach Breach 12 VMSX 310191
Breach 13 VMSX 310040
Breach 14 VMSX 5329
Breach
15 VMSX 310725
Breach 16 VMSX 311642 Breach Breach Breach
17 VMSX 310828
Breach
18 VMSX 310701
Breach
19 VMSX 280501
Breach
Breach Breach
20 VMSX 310198 Breach Breach
21 VMSX 310225
Breach
Breach Breach
22 VMSX 310203 Breach Breach
Breach
23 VMSX 310285
Breach
Breach
24 VMSX 311704
Breach Breach Breach Breach
25 VMSX 311705 Breach
Breach 26 VMSX 311699 Breach
27 VMSX 311652
Breach
28 VMSX 310343
Breach 29 VMSX 28356
30 VMSX 310341 Breach Breach
31 VMSX 310332
Breach
32 VMSX 311640
Breach Breach 33 VMSX 310111
Breach
34 VMSX 310302
Breach
Breach Breach
35 VMSX 310283
Breach 36 VMSX 310297
Breach 37 VMSX 310291 Breach
Breach Breach 38 VMSX 310888
Breach 39 VMSX 311658
Breach 40 VMSX 310219
Breach Breach 41 VMSX 311673
Breach 42 VMSX 311692
Breach
43 VMSX 310060
66| Transportation Safety Board of Canada
With regard to tank car breaches, the following observations were made: • Thirty-three (33) of the 39 derailed tank cars (85%) were breached and released various amounts of product. • Fourteen (14) of the breached tank cars sustained more than 1 type of breach. • Nineteen (19) of the 33 breached tank cars (58%) lost their entire load due to fire and/or spillage. • Fourteen (14) of the 33 breached tank cars (42%) lost part of their load. The remaining product was transferred during remediation operations. • One (1) of the tank cars (the 24th car) had separated completely into 2 portions. • Release from smaller breaches, while not instantaneous, helped feed the pool fire and contributed to spillage of product after the fire was extinguished. Damage to tank car shell 1.44.2 The field examination determined the following: • The 7th and 43rd tank cars had no visible impact-related shell deformation, denting, or scoring. The other 35 of the 37 cars examined exhibited some form of shell collision damage. The shell damage ranged from minor dents and scratches to larger dents and gouges. About 10 tank cars located in the area of the main pileup exhibited large- scale transverse buckling and crushing, which is indicative of plastic collapse. • The shells of 13 tank cars were breached from impact damage. Four tank cars (the 14th, 19th, 21st, and 42nd cars) had small punctures less than 1 foot in diameter. Nine tank cars had larger shell breaches, with dimensions ranging from a few feet to the length of a shell ring. The majority of shell breaches were punctures consistent with collisions with sharp smaller objects (e.g., couplers, trucks, bolsters), while a few tank cars exhibited fractures at sharp folds or buckles in the shell material. • The 24th tank car shell fractured circumferentially and broke into 2 portions. Since this tank car came to rest underneath other tank cars within the main pileup, it likely experienced more severe collision conditions in comparison to those cars located in the front or in the rear of the derailment zone. • All of the shell breaches exhibited features that were typical of ductile overstress failure (slanted fracture surfaces, plastic deformation, and rough fibrous appearance). There was no indication of brittle failure. • The 4 tank cars equipped with a steel jacket and insulation (the 9th, 14th, 19th, and 29th cars) exhibited various degrees of shell impact damage. Two tank cars (the 9th and 29th cars) had relatively minor jacket deformation with no shell breach, while the other 2 tank cars (the 14th and 19th cars) had extensively deformed and torn jackets and shell punctures. The 2 tank cars with shell punctures came to rest in a portion of the pileup where the jackknifed tank cars were tightly packed. These tank cars likely experienced more severe collision conditions than those located in front of the derailment (such as the 9th car) or in a less densely packed portion of the pileup (such as the 29th car).
Railway Investigation Report R15H0021 | 67
The location in which the tank cars with shell impact breaches came to rest is shown in Appendix D. Thermal damage 1.44.3 Thermal damage occurs when a tank car is exposed to a post-derailment fire. Heat-induced (thermal) tears usually occur in loaded tank cars when they are exposed to a fire and the PRD or other tank breaches are unable to vent the rising internal pressure. This can result in an energetic rupture of the tank. When Class 3 flammable liquids are involved, the sudden release of the pent-up pressure usually results in the loss of lading as a large fireball and subsequent fire within the tank that often burns off remaining product to atmosphere. Tank ruptures caused by overheating generally fracture longitudinally along an axis which is perpendicular to the hoop stress in the tank shell. Most of the 37 tank cars examined by the TSB exhibited damage indicating that they had been exposed to the post-derailment fire. The fire damage ranged from scorched paint to changes in surface carbon content and external oxidation consistent with exposure to crude oil and air at elevated temperature. The examination determined the following: • Fifteen (15) tank cars sustained breaches due to thermal tears resulting from exposure to post-derailment fires. • Ten (10) of the 15 tank cars with thermal tears had no other breaches that might have contributed to the release of internal pressure. • Of the 5 remaining tank cars with thermal tears, o 3 had BOV breaches, o 1 had a head breach, and o 1 had a head breach and a BOV breach. • When the location of the thermal tears was compared to the car orientation after it came to rest, every thermal tear was situated in the vapour space of the tank. • Metallurgical examination of a coupon containing a thermal tear revealed features such as necking, a fibrous fracture surface, and elongated micro-voids adjacent to the fracture surface that were consistent with ductile failure at high temperature. • The thermal tears ranged from 18 inches to 240 inches long. In most cases, the plate material had significant thinning in the bulged areas around the thermal tears. Measurements of the lip thickness gave reduction-in-thickness64 ranging from 17% to 70%. These results are generally consistent with the reduction-in-thickness values observed in a previous derailment involving CPC-1232 tank cars65 and with
64 Reduction-in-thickness is calculated using the average lip thickness and nominal plate thickness indicated on the tank car’s certificate of construction. 65 TSB Laboratory Report 146/2015, “Metallurgical Examination of Tank Car Coupons,” Section 3.0.
68| Transportation Safety Board of Canada
published tensile ductility results for AAR TC128 Grade B steel tested at elevated temperature.66 • All tank cars with thermal tears were exposed to the large post-derailment fire fed by the tanks cars with shell and/or head impact breaches. It has been suggested that PRDs with higher start-to-discharge pressure might be at risk of building up excessive internal pressure during a fire, resulting in more energetic (larger) thermal tears. With regard to PRDs and thermal tears, the following observations were made: • All 15 tank cars with thermal tears were equipped with PRDs providing an actual flow capacity greater than 27 000 standard cubic feet per minute. • 4 of the tank cars with thermal tears (the 11th, 12th, 13th, and 40th cars) had a PRD with a start-to-discharge pressure of 165 psig, while the other 11 tank cars with thermal tears had 75 psig PRDs. • On the 4 tank cars equipped with a 165 psig PRD, thermal tear length ranged from 22 inches to 96 inches long. • On the 11 tank cars equipped with a 75 psig PRD, thermal tear length ranged from 18 inches to 240 inches long. There was no indication that tank cars equipped with higher start-to-discharge PRDs had experienced more energetic (larger) thermal tears in this occurrence. With regard to the 4 jacketed and insulated tank cars that were exposed to the post- derailment fire: • Two (2) of the tank cars (the 14th and 19th cars) were breached from impact. These breaches would have contributed to relieving any increase in pressure caused by exposure to the post-derailment fire, making the tank car less susceptible to thermal tear failure. • The 2 other cars (the 9th and 29th cars) had no impact breaches and did not sustain thermal tears. • The 29th tank car was close to several impact-breached tank cars and was fully exposed to the post-derailment fire. • The 9th tank car came to rest partially submerged in the Makami River. This may have had a cooling effect that slowed the rise of internal pressure in the tank car while it was exposed to the post-derailment fire. The small number of jacketed cars involved in this occurrence and the varying conditions experienced by each of these cars meant that it was not possible to determine whether the jacket and insulation made the tank car less susceptible to thermal tear failure.
66 G. E. Hicho, Report NISTIR 5157: The Mechanical, Stress-Rupture, and Fracture Toughness Properties of Normalized and Stress Relieved AAR TC128 Grade B Steel at Elevated Temperatures, (Washington, DC: National Institute of Standards and Technology for the Federal Railway Administration, March 1993).
Railway Investigation Report R15H0021 | 69
Burn-throughs (perforations caused by fire damage) occur when the tank car material is exposed to crude oil and air at elevated temperatures during the post-derailment fire. The resulting material degradation processes, high-temperature carburization and oxidation, are responsible for steel plate erosion and loss of material, which can cause a burn-through. In this occurrence, • Five (5) shell breaches (in the 16th, 18th, 20th, 21st, and 23rd cars) had jagged edges with red discolouration and visibly reduced tank shell wall thickness, indicative of a burn-through. • Two (2) tank car head breaches (the 25th and 26th cars) exhibited features that corresponded to burn-throughs. • All of the cars with burn-throughs were located in the main pileup. • It is considered likely that loss of material from fire damage caused some shell and head impact breaches to grow larger. The location in which the tank cars with thermal tear breaches came to rest is shown in Appendix E. Damage to head shield and tank head 1.44.4 The CPC-1232 standard requires that non-jacketed tanks be equipped with half-head shields whereas jacketed tanks must be equipped with ½ inch thick jacket heads. Requirements for tank-head puncture-resistance systems are specified in the U.S. Code of Federal Regulations Title 49, Part 179, 67 and in the AAR Specifications for Tank Cars. 68 These requirements include design conditions and performance testing for system survivability after coupler-to-tank- head impacts at relative speeds of 29 km/h (18 mph). Of the 37 derailed tank cars examined by the TSB: • 37 (100%) had some form of collision damage to their head shields. • 15 (41%) were missing one head shield and 2 (5%) tank cars had lost both. Most head shields separated due to broken attachment brackets. • 26 (70%) exhibited impact damage in one or both tank heads. • 7 (27%) had sustained a breached head due to impact damage. Most of the 7 head breaches were punctures or tears with dimensions ranging from a few inches to about 2 feet. • On 2 of the tank cars (the 16th and 20th cars), the head was breached above the half- head shield. • On 3 tank cars (the 22nd, 30th, and 37th cars), the half-head shield was missing and the breach was in the bottom portion of the head. All head breaches were associated
67 United States Code of Federal Regulations Title 49, Part 179: Specifications for Tank Cars, Section 179.16: Tank-head puncture resistance systems, and Appendix A: Procedure for Tank- Head Puncture-Resistance Test. 68 Association of American Railroads, Manual of Standards and Recommended Practices, Section C-III: Specifications for Tank Cars M-1002, Chapter 5, Section 5.3.
70| Transportation Safety Board of Canada
with significant deformation suggesting that the heads had been subjected to large collision forces. • On 1 car (the 26th car) the B-end half-head shield and most of the B-end head were missing. It is considered most probable that this head breach would have caused the rapid release of the tank car’s lading. • All of the head breaches exhibited features that were typical of ductile overstress failure (slanted fracture surfaces, plastic deformation, and rough fibrous appearance). There was no sign of brittle failure. • The 4 tank cars equipped with jackets, insulation and full head shields (the 9th, 14th, 19th, and 29th cars) exhibited various degrees of impact damage but were not breached. The examination results indicate that the full head shields fitted on the CPC-1232 tank cars were most effective in protecting the tank heads against impact punctures during the derailment. The location in which the tank cars with head impact breaches came to rest is shown in Appendix F. Damage to top fittings and pressure relief devices 1.44.5 All of the 39 derailed tank cars were fitted with protective housings designed in accordance with the AAR’s top protection requirements for non-pressure cars. The protective housing on 18 of the 39 derailed tank cars (46%) had some form of impact damage. In most cases the impact damage was relatively minor. However, 4 tank cars exhibited extensive impact damage to their protective housing, as follows: • On the 17th and 30th cars, the wall of protective housing was deformed and the housing was partially separated from the top fitting nozzle cover. • On the 16th and 24th cars, the protective housing was completely separated from the top fitting nozzle cover. All of the top fittings of these 2 tank cars were sheared off. The protective housing and top fittings of several tank cars exhibited extensive red discolouration from fire damage. The caps of some fittings were made of a material that melted during the post-derailment fire, leaving the ball of the fitting exposed. Damage to manways 1.44.6 The derailed cars were equipped with hinged and bolted manway covers. On 20 of the 37 derailed tank cars examined by the TSB, the manway cover had been opened during remediation operations. The manway covers of 11 tank cars were closed. For the remaining 6 tank cars, • One of the eyebolts on the 41st car was dislodged and product residue was observed, indicating that the seal had been compromised. • Five (5) of the tank cars were breached from an impact-damaged manway: o The manway covers of 3 tank cars (the 17th, 21st, and 34th cars) were missing.
Railway Investigation Report R15H0021 | 71
o On the 19th tank car, the manway nozzle was extensively deformed and the manway cover was broken. o The 24th tank car had separated into 2 portions, and the fracture went through the manway nozzle and manway reinforcing pad. Damage to skid protection and bottom outlet valves 1.44.7 The BOV skid protection on 28 of the 37 tank cars examined sustained some form of impact damage, ranging from deformation or crushing of the skid assembly to a broken skid and/or separated skid-to-shell weld. Most tank cars with damaged skids also had significant shell deformation in the vicinity of the skid, indicating that they had been subjected to large collision forces. The BOV damage observed on the 37 derailed tank cars examined is summarized in Table 12. Table 12. Bottom outlet valve damage Skid Handle assembly BOV adaptor Condition No. of cars affected Condition No. of cars affected Condition No. of cars affected No impact damage 6 No impact damage 6 No impact damage 13** Impact damaged 28 Deformed or missing 28 Sheared off, exposing BOV ball 20 Unknown* 3 Unknown* 3 Unknown* 3
- Unknown because this portion of the tank car was not visible for inspection.
** The cap of the BOV adaptor of the 15th tank car was broken, but there was no indication of product loss. The AAR requires that “bottom outlet valve handles, unless stowed separately, […] be designed to either bend or break free on impact, or the handle in the closed position must be located above the bottom surface of the skid.”69 In this occurrence, the BOV handle assembly and securement mechanism of 28 tank cars had some form of impact damage, ranging from impact-related deformation to complete separation of the handle assembly and securement mechanism. The BOV adaptor was sheared off at the mounting flange (the intended breaking point) on 20 of the tank cars, which caused their BOV ball to be exposed. With the exception of the 31st and 41st cars, these cars also had impact-damaged or missing BOV handles. Of the 20 tank cars with sheared-off BOV adaptors, 13 tank cars (65%) (the 7th, 11th, 19th, 21st, 22nd, 23rd, 24th, 31st, 32nd, 33rd, 34th, 37th, and 40th cars) had an open, partially open, or visibly leaking BOV ball. All of the tank cars with breached BOVs had an impact-damaged handle assembly.
69 Association of American Railroads, Manual of Standards and Recommended Practices, Section C-III: Specifications for Tank Cars M-1002, Appendix E, Paragraph 10.1.2.8.
72| Transportation Safety Board of Canada
The location in which the tank cars with BOV breaches came to rest is shown in Appendix G. The investigation into a 2013 derailment involving pre-CPC-1232 Class 111 tank cars in Ontario (TSB Railway Investigation Report R13T0060) had previously identified this issue. TSB Rail Safety Advisory 15/13 was issued to Transport Canada to communicate the risk of product loss through BOV handles that are damaged during derailments. This risk was also identified during the Lac-Mégantic investigation. 1.44.7.1 National Transportation Safety Board recommendation regarding bottom outlet valves Following an investigation into the 2009 derailment of a CN freight train in Cherry Valley, Illinois, the NTSB determined that “existing standards and regulations for the protection of bottom outlet valves on tank cars do not address the valves’ operating mechanisms and therefore are insufficient to ensure that the valves remain closed during accidents.”70 The NTSB recommended that the Pipeline and Hazardous Materials Safety Administration (PHMSA) Require that all bottom outlet valves used on newly manufactured and existing non- pressure tank cars are designed to remain closed during accidents in which the valve and operating handle are subjected to impact forces. (R-12-6)71 In 2016, PHMSA HM-251 required bottom outlet valve protection for the DOT-117 tank car, including performance and retrofit standards, in sections 179.202-8, 179.202-12(e), and 179.202-13(g) of the U.S. Code of Federal Regulations Title 49, Part 179. Specifically, all bottom outlet handles must either be removed or designed to prevent unintended actuation during derailment scenarios. These provisions satisfied the intent of NTSB Safety Recommendation R-12-6, which was subsequently classified as CLOSED—ACCEPTABLE ACTION. Damage to stub sills 1.44.8 Tank car stub sills are prohibited from being attached directly to the tank shell. The AAR requires that reinforcement pads be attached to the tank shell and that the stub sills be attached to the reinforcement pads. The AAR also requires that the reinforcement plate be extended on either side of the sill attachment and at the head brace attachment. 72 73 These requirements are intended to prevent product release by ensuring that, if a stub sill is overloaded, the separation occurs between the sill and the reinforcement pad, and does not propagate into the tank shell.
70 United States National Transportation Safety Board (NTSB), Railroad Accident Report NTSB/RAR-12-01: Derailment of CN Freight Train U70691-18 With Subsequent Hazardous Materials Release and Fire, Cherry Valley, Illinois, June 19, 2009 (Washington, DC: 14 February 2012), p. 88. 71 Ibid, p. 90. 72 Association of American Railroads, Manual of Standards and Recommended Practices, Manual C-III M-1002, Chapter 6, Paragraph 6.1.2.5. 73 Ibid., Chapter 6, Paragraphs 6.1.2.5.2 and 6.1.2.5.3, and Appendix E, Part 13.0.
Railway Investigation Report R15H0021 | 73
Thirty-one (31) of the 37 tank cars examined had sustained impact damage to at least one stub sill and/or coupler assembly, and 25 tank cars were damaged on both ends. While 6 of the tank cars (the 15th, 16th, 23rd, 25th, 37th, and 39th cars) separated at the stub sill attachment, none of the stub sill attachment separations caused a tank breach. 1.44.8.1 Tank car material The tank car head and shell material met the requirements for chemical composition and tensile properties of the specified AAR TC128 Grade B normalized steel. 1.45 Legacy Class 111 and Class 111 CPC-1232 compliant tank cars A TSB case study was conducted into 3 accidents that involved the derailment of Class 111 tank cars carrying crude oil. In each case, the breached tank cars ignited a large pool fire. The relevant accident information is summarized in Table 13. Table 13. Summary of accident information for TSB railway investigations R13D0054, R15H0013, and R15H0021
TSB occurrence number R13D0054 R15H0013 R15H0021 Accident summary Runaway and main- track derailment, Montreal, Maine & Atlantic Railway, Freight train MMA-002, Mile 0.23, Sherbrooke Subdivision, Lac- Mégantic, Quebec Main-track derailment, Canadian National Railway Company, Unit train U70451-10, Mile 111.6, Ruel Subdivision, Gladwick, Ontario Main-track derailment, Canadian National Railway Company, Unit train U70451- 02, Mile 88, Ruel Subdivision, Gogama, Ontario Date of accident 06 July 2013 14 February 2015 07 March 2015 Lading Petroleum crude oil (UN1267) Petroleum crude oil (UN1267) and Petroleum distillates (UN1268) Petroleum crude oil (UN1267) Number of tank cars in consist 72 100 94 Location in train of first tank car to derail 3 7 6 Number of tank cars derailed 63 29 39 Speed at derailment 65 mph (105 km/h) 38 mph (61 km/h) 43 mph (69 km/h) Temperature reported at time of derailment 21 °C −30 °C −9 °C Several types of Class 111 tank cars are used for transporting flammable liquids. These include jacketed and insulated tank cars as well as non-jacketed and non-insulated tank cars.
74| Transportation Safety Board of Canada
Legacy Class 111 tank cars are those that were ordered prior to 01 October 2011 and built to older TC/DOT 111 standards. CPC-1232 compliant Class 111 tank cars were built since 2011 and meet the TP1487774/CPC 123275 standard. Tank cars manufactured on or after 01 October 2015 must meet the new TC/DOT 117 standard. The different features of these three standards are summarized in Table 14. Table 14. Comparison of features for tank cars transporting flammable liquids Requirements Older legacy Class 111 Class 111 CPC-1232 compliant New TC/DOT- 117* Non-jacketed and non-insulated Jacketed and insulated Head shields No Half Full Full Top-fitting protection Optional Mandatory Mandatory Mandatory Thermal protection and jacketed Optional Optional Optional Mandatory Normalized steel Optional Mandatory Mandatory Mandatory Thickness and type of steel (minimum) 11.1 mm (7/16 inch) 12.7 mm (1/2 inch) thick TC128-B or 15.9 mm (5/8 inch) in ASTM A516-70 11.1 mm (7/16 inch) thick TC128-B or 12.7 mm (1/2 inch) in ASTM A516-70 14.3 mm (9/16 inch) thick in TC128-B Performance standard for thermal protection, head and shell puncture resistance No No No Yes Enhanced performance standard for bottom outlet valves No No No Yes
- Regulations Amending the Transportation of Dangerous Goods Regulations (TC 117 Tank Cars), P.C. 2015-486,
30 April 2015, SOR/2015-100, Canada Gazette, Part II, Vol. 149, No. 10 (20 May 2015) available at http://gazette.gc.ca/rp-pr/p2/2015/2015-05-20/html/sor-dors100-eng.php (last accessed on 06 June 2017). Tank car damage is strongly influenced by the derailment speed and number of tank cars involved in a derailment. In this case study, occurrence R15H0013 (Gladwick) had the lowest incidence of breached tank cars (66%), the lowest derailment speed, and lowest number of derailed tank cars. The percentage of tank cars with more than one type of breach increased with an increase in derailment speed and/or number of derailed cars. The percentage of cars with any type of breach in occurrence R15H0021 (Gogama) was similar to that observed in occurrence R13D0054 (Lac-Mégantic), which involved
74 Transport Canada, TP 14877E, Containers for Transport of Dangerous Goods by Rail (December 2013). 75 American Association of Railroads (AAR), Manual of Standards and Recommended Practices, Section C-III: Specifications for Tank Cars, M-1002 (10/2007), Chapter 2.7: Requirements for Cars Built for the Transportation of Packing Group I and II Materials with the Proper Shipping Name “Petroleum Crude Oil”, “Alcohols, n.o.s.”, and “Ethanol and Gasoline Mixture” (implemented September 2011).
Railway Investigation Report R15H0021 | 75
significantly higher speed and a higher number of derailed cars. An overview of the tank car damage observed during the subject occurrences is contained in Table 15. Table 15. Summary of tank car damage in occurrences R13D0054, R15H0013, and R15H0021 Condition Cars affected in R13D0054 Cars affected in R15H0013 Cars affected in R15H0021 Number Percentage Number Percentage Number Percentage Derailed
63
29
39
No breach observed 4 6 10 34 6 15 Breached (any type) 59 94 19 66 33 85 More than one type of breach 33 52 6 21 14 36 The legacy Class 111 tank cars involved in occurrence R13D0054 had the highest percentage of shell, head, top fitting, and PRD breaches. For the Class 111 CPC-1232 compliant tank cars involved in occurrence R15H0013, shell breaches had the highest incidence, followed by thermal tears. For the Class 111 CPC-1232 tank cars involved in occurrence R15H0021, thermal tears were the most frequent breach, followed by an equal number of shell and BOV breaches. A summary of the various types of breach responsible for product release during the subject occurrences is contained in Figure 22.76 Figure 22. Summary of the various types of breach responsible for product release in occurrences R13D0054, R15H0013, and R15H0021
When tank car performance from the 3 accidents was compared, the following general observations were made:
76 For detailed tank car inspection results, see TSB Laboratory Reports LP149/2013 (occurrence R13D0054), LP056/2015 (occurrence R15H0013) and LP052/2015 (occurrence R15H0021)
76| Transportation Safety Board of Canada
• Occurrences R15H0013 and R15H0021, which involved Class 111 CPC-1232 compliant tank cars, had a similar incidence of shell breaches (about one-third of the derailed tank cars). The incidence of shell breaches was almost doubled (59%) for occurrence R13D0054, which involved legacy Class 111 tank cars. • In occurrence R13D0054, about half of the tank cars with large shell ruptures were clustered towards the end of the train and formed a large pileup. This large pileup likely acted like a wall that resulted in highly constrained derailment conditions. This caused large-scale buckling and extreme tank deformations and structural failure of the legacy tank cars due to plastic collapse. • Occurrences R15H0013 and R15H0021 produced pileups in which some tank cars were buried under, and others projected over, adjacent cars. These collisions generated forces of sufficient magnitude to split 4 tank cars into 2 portions. • In all cases, the majority of the shell breaches (69% to 89%) were of medium to large size (from about 1 foot to the circumference of the car). These large shell breaches likely caused the rapid release of the tank car’s lading and were factors which contribute to the large pool fires. The TSB case study determined that: • For the legacy Class 111 tank cars involved in occurrence R13D0054, the most frequently observed types of breach were shell breaches, followed by head breaches. For the Class 111 CPC-1232 compliant tank cars involved in occurrence R15H0013, shell breaches had the highest incidence, followed by thermal tears. For the Class 111 CPC-1232 compliant tank cars involved in occurrence R15H0021, thermal tears were the most frequent breach, followed by an equal incidence of shell and BOV breaches. • Even though the cars were constructed of normalized steel, brittle shell fractures were observed on some Class 111 CPC-1232 compliant tank cars involved in occurrence R15H0013. This indicates that a non-jacketed and non-insulated Class 111 CPC-1232 compliant tank car may experience brittle shell fracture when subjected to the combined effects of low ambient temperature and severe collision conditions. Similarly, it is likely that legacy Class 111 tank cars constructed of non-normalized material would be even more vulnerable to brittle shell fracture when subjected to the same conditions. • Of the 6 jacketed and insulated Class 111 CPC-1232 compliant tank cars involved in the R15H0013 and R15H0021 derailments, 3 were breached from a shell puncture. This suggests that the additional impact resistance afforded by the jacket was insufficient for the collision conditions during these derailments. • The Class 111 CPC-1232 compliant tank cars had a significantly lower incidence of head breaches than the legacy Class 111 tank cars. However, the case study suggests that full-head shields are more effective than half-head shields when severe collision conditions are involved. • The legacy Class 111 cars and Class 111 CPC-1232 compliant tank cars with top protection had a significantly lower incidence of breached top fittings and PRDs than the legacy Class 111 tank cars that did not have top protection.
Railway Investigation Report R15H0021 | 77
• The incidence of product loss from impact-damaged BOVs was similar for both legacy Class 111 and Class 111 CPC-1232 compliant tank cars. Some of these cars might not have experienced product loss had they been equipped with a handle assembly configured to prevent unintended actuation of the ball valve. • The case study suggests that the risk of failure due to a thermal tear is of similar magnitude for non-jacketed and non-insulated legacy Class 111 tank cars as well as non-jacketed and non-insulated Class 111 CPC-1232 compliant tank cars. • There was insufficient information to determine whether jacketed and insulated Class 111 CPC-1232 tank cars have enhanced fire survivability. • The non-jacketed and non-insulated Class 111 CPC-1232 compliant tank cars and legacy Class 111 tank cars examined for occurrence R13D0054 appear to have similar performance when subjected to severe derailment conditions such as those present in the subject occurrences. 1.46 TSB Watchlist The TSB Watchlist identifies the key safety issues that need to be addressed to make Canada’s transportation system even safer. Safety management and oversight 1.46.1 Transportation companies have a responsibility to manage safety risks in their operations. SMS provides a framework to achieve this end, and many companies implement a formal SMS either voluntarily or to comply with TC’s SMS Regulations. Even small companies need to have some safety processes in place to manage risk. Some companies consider safety to be adequate as long as they are in compliance with regulatory requirements, but regulations alone cannot foresee all risks unique to a particular operation. That is why the TSB has repeatedly emphasized the advantages of SMS, an internationally recognized framework to allow companies to effectively manage risk and make operations safer. The move toward an SMS regime must be supported by appropriate regulatory oversight. Given that regulators will encounter companies with varying degrees of ability or commitment to effectively manage risk, this oversight must be balanced. It needs to include proactive auditing of companies’ safety management processes, ongoing education and training, and traditional inspections to ensure compliance with existing regulations. Safety management and oversight will remain on the TSB Watchlist until • Transport Canada implements regulations requiring all commercial operators in the air and marine industries to have formal safety management processes and effectively oversees these processes; • transportation companies that do have SMS demonstrate that it is working— that hazards are being identified and effective risk-mitigation measures are being implemented; and • Transport Canada not only intervenes when companies are unable to manage safety effectively, but does so in a way that succeeds in changing unsafe operating practices.
78| Transportation Safety Board of Canada
Moving forward, 3 elements are key: a clear regulatory framework requiring companies to implement some form of SMS; SMS that are effective in identifying hazards and mitigating risks; and balanced regulatory oversight. Previous TSB investigations have revealed some problems: • Although all rail operators in Canada are required to have an SMS, the TSB has identified instances where SMS processes were weak or not used, resulting in hazards going unidentified and risk mitigations not being put in place. 77 • With respect to TC regulatory oversight, 2 problems have been observed: a failure to identify companies’ ineffective processes, and an imbalance between auditing processes versus traditional inspections. Transportation of flammable liquids by rail 1.46.2 In November 2014, the TSB added “Transportation of flammable liquids by rail” to its Watchlist issues. This issue remained on TSB’s Watchlist in 2016. The transportation of crude oil by rail across North America increased exponentially starting in 2009, peaking in 2014 at 238 000 carloads in Canada78 and 500 000 carloads in the U.S. 79 Ethanol shipments, meanwhile, were relatively stable, with an average of 76 250 carloads per year in Canada and 331 000 carloads per year in the U.S. 80 Despite recent downward trends, the volume of flammable liquids being transported by rail is expected to remain significant. The TSB is concerned that current railway operating practices, combined with the vulnerability of older tank cars used to transport crude oil and other flammable liquids, are not adequate to mitigate effectively the risk posed by the transportation of large quantities of such dangerous goods by rail. The vulnerability of Class 111 tank cars has been recognized for years.81 The Board has called for tougher standards for all Class 111 tank cars82—not just new ones—to reduce the likelihood of product being released during accidents. A number of accidents investigated in the U.S. by the NTSB have also highlighted the vulnerability of Class 111 tank cars.83
77 TSB Railway Investigation Reports R14W0256, R14Q0045, R13D0054, and R09T0057. 78 Crude oil shipments moved by Canadian Class 1 railways. 79 Railway Association of Canada and Association of American Railroads. 80 2009 to 2015. 81 TSB Recommendation R07-04. 82 TSB Recommendation R14-01. 83 New Brighton, Pennsylvania (October 2006); Cherry Valley, Illinois (June 2009); Tiskilwa, Illinois (October 2011); Columbus, Ohio (July 2012); and Casselton, North Dakota (December 2013); Transportation of flammable liquids by rail will remain on the Watchlist until • railway companies conduct thorough route planning and analysis, and perform risk assessments to ensure that risk-control measures are effective; and • more robust tank cars are used when large quantities of flammable liquids are transported by rail to reduce the likelihood of a dangerous-goods release during accidents.
Railway Investigation Report R15H0021 | 79
The TSB is encouraged that federal regulators in Canada and the U.S. have taken considerable action to address the situation, including the promulgation of a more robust tank car standard (Class 117), retrofit provisions, implementation timelines, and regulatory monitoring and enforcement. The actions to date by the federal regulators and the railway industry have contributed to a significant decline in the use of legacy Class 111 tank cars to transport crude oil since 2014. Although the federal regulators and the railway industry have taken actions with respect to tank car safety, federal regulations nonetheless allow Class 111 tank cars to be used for the transport of certain flammable liquids until mid-2025. Consequently, until all higher-risk flammable liquids in North America are transported in more robust tank cars with enhanced protection, an elevated risk will remain. Since the Lac-Mégantic derailment in July 2013 (TSB Railway Investigation Report R13D0054), other recent derailments in Canada84 have demonstrated that there can be significant risk to people, property, and the environment when trains carrying large volumes of flammable liquids derail. These recent occurrences highlight the need for strategic route planning and safer operations of all trains carrying DGs in Canada. Railways must carefully choose the routes on which crude oil and other flammable liquids are to be carried, and ensure that train operations over those routes will be safe. These risks must be dealt with as a North American transportation issue, because these products are transported across borders by rail operators. 1.47 TSB laboratory reports The following TSB laboratory reports support this investigation: • LP 052/2015 – Examination of tank cars (R15H0021) • LP 053/2015 – Analysis of crude oil samples (R15H0021) • LP 054/2015 – Examination of rail joint and pieces (R15H0021) • LP 84/2015 - Rail Failure Examination (R15H0020) • LP051/2016 - Case study of derailment damage: Legacy versus enhanced Class 111 tank cars (R13D0054, R15H0013, and R15H0021)
Lynchburg, Virginia (April 2014); Mount Carbon, West Virginia (February 2015); Heimdal, North Dakota (May 2015); Lesterville, South Dakota (September 2015). 84 TSB Railway Investigation Reports R14M0002, R14W0256, R15H0013, and R15V0046.
80| Transportation Safety Board of Canada
- 0 Analysis
The train was operated in accordance with company and regulatory requirements. The rolling stock was maintained in good condition, and there were no defects observed that were considered as being contributory to this occurrence. The analysis will focus on the rail failure, Canadian National Railway Company (CN) maintenance practices with regard to the installation of plug rails, training of track maintenance personnel, tank car performance, crude oil properties, speed of key trains, CN’s safety management system (SMS) and corridor risk assessment, CN’s incident command and emergency response, regulatory oversight, and environmental impact. 2.1 The accident On 07 March 2015, at about 0242, CN crude oil unit train U70451-02 was proceeding eastward at about 43 mph on CN’s Ruel Subdivision when a train-initiated emergency brake application occurred at Mile 88.70 near Gogama, Ontario. The 6th to the 44th car (39 cars in total) had derailed. As a result of the derailment, about 2.6 million litres of petroleum crude oil (UN1267) was released to atmosphere, water, or surface. The released product ignited and caused explosions, and some product entered the nearby Makami River. About 1000 feet of track was destroyed, and the ensuing fires destroyed the CN railway bridge that traversed the river. Approaching the derailment site from the west, there were no impact marks observed on the track infrastructure. At the west end of the derailment site, a number of broken pieces of the south rail were recovered in the vicinity of Mile 88.75 including • a 146-inch-long section of rail containing a broken thermite weld that had been removed from the south rail and replaced with a plug rail of equal length 3 days before the derailment; • the east joint of a plug rail, with joint bars securing a 53-inch-long section and a fractured 20-inch-long section of the east end parent rail; and • a 4-inch-long piece of the rail head from the fractured 20-inch-long section of the east end parent rail. The recovered piece of the rail head exhibited a vertical split head (VSH) rail defect. The east end parent rail had an area of horizontal web fracture between the joint bars and a web/base fracture east of the joint bar ends. The web fracture surface displayed pounding damage that indicated that this fracture occurred prior to the final rail failure and had remained in track for some time before the occurrence. The 4-inch-long recovered section that contained the VSH defect mated with the horizontal web fracture. Prior to the arrival of the train, a 16-inch-long portion of the parent south rail head had broken off due to a VSH rail failure within the east joint of a plug rail repair, leaving a gap in the south rail. The derailment occurred when the south rail failed catastrophically beneath the train as it traversed the track, resulting in the derailment of the 6th to 44th tank cars, which were loaded with petroleum crude oil.
Railway Investigation Report R15H0021 | 81
- 2
Plug rail repair Three days before the derailment, the signals controlling traffic into the Gogama-Bethnal block (Mile 86.20 to Mile 94.70) unexpectedly changed to a RED indication at about 1935, prohibiting rail traffic from entering the block. Because the regular track maintenance foreman (TMF) had been called out to replace a defective rail east of Gogama, the track supervisor (TSPVR) instructed the snow patrol foreman (SPF), who was also a thermite welding foreman during the summer, and a helper on light duties, to find the source of the outage. About 1½ hours later, a broken thermite weld was located in the south rail at Mile 88.75. Dye penetrant testing 2.2.1 Since the section work crew was at the end of its shift and nearing the end of available hours to operate the track force optimization (TFO) vehicle, the TSPVR asked the SPF and the helper to change out the rail. After arriving on site with the required materials, the SPF prepared for the installation of the plug rail. During the plug rail repair, the parent rail was cut and the exposed rail ends were visually inspected for cracks. No defects were noted. However, the SPF did not perform a dye penetrant test on the cut rail ends as required by the CN Engineering Track Standards (ETS), section 1.7. TSB examination of the original break at the thermite weld on the east end of the parent rail revealed a VSH defect in the rail head similar to the VSH defect observed in the east end joint parent rail. The VSH defect had propagated through the thermite weld from the original east parent rail to the west parent rail before the original rail break and plug rail repair. This suggests that a VSH defect had been present in the east parent rail but not identified during the plug rail repair. Had a dye penetrant inspection been performed, a VSH indication would likely have been observed in the cut east rail end, and more of the east parent rail may have had to be removed. Rail grinding 2.2.2 The plug rail was rolled into track with no joint gaps, the joint bolt holes were drilled, and the plug rail was bolted, spiked, and anchored in place. After the repair, the plug rail was higher than the parent rail at the east end of the installation. Although no physical measurements were taken, the SPF visually estimated that the plug rail was 2 mm higher than the parent rail, which was an underestimate. A mismatch of only 2 mm is less than the 3 mm allowed for Class 4 track and would not have required any grinding to ensure a smooth transition between the rails. Nevertheless, the SPF decided to touch up the mismatch by grinding 2.5 inches (60 mm) of the east plug rail head with a hand grinder to make a short ramp between the running surfaces of the plug rail and the parent rail. The hand grinder was used because the larger rail grinder was not available. The overall mismatch on the occurrence rails was in the range of 0.375 inch (9 mm). Although rail end batter (REB) and post-fracture pounding on the horizontal web fracture
82| Transportation Safety Board of Canada
contributed to the mismatch, the actual mismatch was likely about 0.265 inches (6.75 mm). Had a similar mismatch occurred in flash butt welded rail, the CN Welders Manual (2005) required the transition to the higher rail to be ground back 36 inches from the mismatch. The CN ETS, Track Standard (TS) 1.2 requires that, where rail end mismatch exceeds 1/8 inch (3 mm) on the top or the gauge side of a rail joint, it shall be repaired promptly by grinding, welding, or replacing the rail. However, no specific guidance was provided to CN engineering employees relating to the length of grinding required when a rail end mismatch occurs during plug rail repairs. Rail end mismatch 2.2.3 Discontinuities between rail ends at a joint create dynamic wheel-rail forces (or wheel impact forces) that can result in wear, deterioration, and early failure of track components. In the U.S., the Volpe National Transportation Systems Center has modelled approaches of varying complexity to estimate the dynamic wheel-rail force at joints having steps or transitions (also known as ramps) of various sizes. In this occurrence, the speed was 43 mph and the joint had a vertical mismatch of up to 0.265 inch (6.75 mm) with a 2.5 inch (60 mm) ramp at the time of failure. The short, 2.5 inch (60 mm) transition ramp acted more as a step that could result in calculated wheel impacts of up to about 140 kips as wheels transitioned between the higher and lower rail. From the time that the plug rail repair was complete until the derailment, 44 trains had traversed the area. Assuming that each train had about 100 cars, approximately 17 600 wheels traversed the plug rail repair in the south rail, and each of these wheels would have had an elevated impact over the rail mismatch transition. This created an environment where the pre-existing VSH defect in the east parent rail could more rapidly propagate to failure. Prior to the plug rail repair, the east end parent rail contained a VSH defect that was subjected to normal contact rolling stresses. Following the repair, the dynamic loading created by rail wheels traversing the east end joint mismatch increased the localized stresses on the east end parent rail. The 2.5 inch (60 mm) transition zone created by grinding the plug rail was ineffective and created an abrupt change in rail head height that increased the dynamic loads applied to the east end parent rail head, which also contained a VSH defect, and caused the rail to fail. On the day of the repair, the work was completed at about 2245 and rail traffic was restored at 2307. The TSPVR had intended to check the repair to ensure that it had been properly completed. However, the following morning, the TSPVR became occupied responding to another derailment at Mile 243.50 on the Ruel Subdivision near Minnipuka, Ontario, and did not check the plug rail repair. Given the state of the plug rail repair and short transition between rail end mismatch at the east end joint, a slow order should have been placed on the track.
Railway Investigation Report R15H0021 | 83
Although the east end joint would have eventually failed due to the presence of the VSH in the east end parent rail, a slow order would likely have reduced the severity of the derailment. 2.3 Snow patrol foreman training regarding broken rails While the repair was being made, several phone and radio calls were made to the SPF from the TSPVR, rail traffic controller (RTC), and Senior Manager Engineering (SME) for progress updates. The SPF was aware that eastbound and westbound trains were already backed up and that pressure was mounting to complete the repair. The SPF carried out the plug rail repair with the assistance of a helper who was on restricted duties, using a TFO vehicle with which the SPF was unfamiliar. At the same time, the SPF was responding to repeated requests for status updates on when the track would be available. The SPF was also a qualified track foreman and, as such, was considered qualified to change out a broken rail, but it was not the SPF’s usual task. The SPF usually worked as a welding foreman and primarily worked with new rail which did not require a dye penetrant test. Therefore, the SPF considered the dye penetrant test to be for older rails removed from track. The SPF was aware of the dye penetrant test but had never performed one before or seen it performed. On 27 January 2015, the SPF had taken the CN Engineering winter safety online exam, which included some questions about dye penetrant testing. The first attempt was unsuccessful, but the second attempt was successful. While there was a question about dye penetrant testing on each test, there was no practical demonstration or training on how to conduct a dye penetrant test. The online training at CN relating to dye penetrant testing did not specifically highlight the importance of the test as part of plug rail repairs or provide opportunities for practical hands-on training. If online training for safety-critical tasks is not reinforced by practical training, trainees may not fully comprehend the importance of critical steps within the task, increasing the risk that the task will not be adequately performed. 2.4 Errors of omission Errors of omission are known to occur more readily in maintenance tasks which require a change in routine for the maintainer and tasks which are not critical to the goal of the maintenance task are more easily omitted. In this occurrence, the SPF did not perform the dye penetrant test during the installation of the plug rail as required by CN’s ETS. The SPF was performing a task that was not part of the SPF’s regular routine. Although the SPF was aware of the of the dye penetrant test, the test was not required when the SPF worked as a welding foreman installing new rail during the summer. Furthermore, the procedures related to changing and testing the plug rail were not all in one place, but rather dispersed among various sections of CN’s ETS and recommended practices. The requirement to perform a dye penetrant test on the exposed rail ends was not specifically discussed between the SPF and the TSPVR, nor was it required to be.
84| Transportation Safety Board of Canada
Consequently, there were no reminders such as a checklist or independent verification to ensure that this infrequently performed but important dye penetrant test had been completed. If infrequently performed safety-critical tasks are conducted from memory without the aid of a checklist or independent verification, important steps to properly complete the task can be inadvertently omitted, increasing the risk that the task will not be adequately performed. 2.5 Ultrasonic rail testing VSH defects are a common rail fatigue defect and are considered dangerous because they can develop rapidly and are difficult to detect, even with ultrasonic inspection. In 2014, Sperry Rail Service detected a total of 1533 VSH defects while testing 134 054 miles of CN track in Canada. During the same period, CN reported 692 in-service rail failures, 76 (or 11%) of which were due to VSH defects. The occurrence rail had been manufactured by Sydney Steel Company. This company had experienced various process and quality control problems with its rail manufacturing process throughout its history. One problem had been the presence of centreline streaking that extended into the rail head. In this occurrence, once the rail head had sufficient wear, the tip of the centreline streaking was situated in an area of the rail head that was subjected to the highest rolling contact forces, making it more susceptible to rapid VSH fracture propagation. Because much of the Sydney rail on the Ruel Subdivision was of the same vintage, installed around the same time and subjected to similar wear, it was now also becoming more susceptible to VSH failure. CN was aware of this and had implemented rail flaw inspections on the Ruel Subdivision approximately every 20 days throughout the winter months and every 37 days throughout the rest of the year to protect against rail VSH failures. The performance guidelines at CN for ultrasonic inspections are more rigorous than industry standard. However, not all VSH defects are detected, and some progress to failure. For a rail defect to be detected ultrasonically, it must present a reflecting surface for the ultrasonic energy to be reflected and recorded by the testing equipment. A VSH defect originating in a pre-existing seam becomes visible only when it opens. Until that time, a seam is relatively homogeneous with the rail steel and does not present a reflecting surface for the ultrasonic energy to be reflected from. Although a pre-existing seam can facilitate VSH development under the right conditions, a pre-existing seam is not a VSH defect and there is nothing to detect ultrasonically until a VSH defect is present. VSH defect growth rates are variable but can develop rapidly, particularly when exposed to significant increases in rail traffic tonnages, and progress to failure between rail tests. Although clearly visible in the broken thermite weld, the VSH defect that caused the rail to fail was either not present or too small to be detected during the ultrasonic test conducted on 02 March 2015 (i.e., 2 days before the broken rail occurred and 5 days before the derailment). 2.6 Petroleum crude oil sample analysis The laboratory analysis of the product samples determined that the product’s chemical and physical properties were consistent with those of a light sweet crude oil. The test results were
Railway Investigation Report R15H0021 | 85
also consistent with the product information provided in the material safety data sheet (MSDS).The product was appropriately classified. The petroleum crude oil exhibited similar density, viscosity, and volatility to that of the products involved in the Gladwick occurrence (R15H0013) and to the Bakken Shale crude oil involved in the Lac-Mégantic occurrence (R13D0054). The low flash point of the petroleum crude oil explains why it ignited so quickly once the tank cars were breached. The large quantities of spilled product, the rapid release of the product, and the product’s high volatility and low viscosity contributed to the ignition of large post-crash fires and the pool fire. 2.7 Tank car performance Historically, legacy Class 111 tank cars were built with a gross rail load (GRL) capacity of 263 000 pounds. In the mid-1990s, the industry began moving towards a Class 111 tank car with a GRL capacity of 286 000 pounds. Such tank cars were required to have increased puncture resistance for the heads and shells, increased design loads, and improved protection for top and bottom fittings (service equipment). In 2011, to further reduce the risk associated with transporting more dangerous goods (DGs) in higher-capacity cars, the Association of American Railroads (AAR) implemented the CPC- 1232 tank car standard. This standard incorporated a number of enhancements, similar to those on the cars with the 286 000 pounds GRL, for newly constructed Class 111 tank cars, ordered after 01 October 2011, that were to be used for the transportation of certain Class 3 flammable liquids (packing group I or packing group II) such as petroleum crude oil, ethanol, and methanol. The CPC-1232 safety enhancements included • additional top fitting protection; • use of reclosing pressure relief devices (PRDs); • use of normalized steel for tank shells and tank heads; • increased minimum material thickness (½ inch) for all tank cars that were not jacketed and insulated; and • ½-inch-thick half-head shields. In April 2014, in response to TSB Recommendation R14-01, TC announced a 3-year phase-out of older, less crash-resistant legacy Class 111 tank cars in crude oil service. In July 2014, the TP 14877 standard was adopted by reference in the Transport Canada (TC) Transportation of Dangerous Goods Regulations, which aligned federal regulations with the 2011 AAR CPC-1232 standard. In May 2015, TC published regulations establishing requirements for a new flammable liquid tank car standard (TC-117),85 along with a phase-out schedule for older tank cars in flammable liquid service in 10 years (2025).
85 The new regulations require that all new tank cars built for the transport of flammable liquids be constructed using thicker and more impact-resistant steel and be equipped with jacketed thermal protection, full-height head shields, top fittings protection, improved bottom outlet valves, and appropriate pressure relief devices.
86| Transportation Safety Board of Canada
All tank cars involved in this occurrence were CPC-1232 compliant. Tank car breaches 2.7.1 Of the 39 derailed tank cars, 33 (85%) were breached and released various amounts of product, and 14 of the breached tank cars sustained multiple breaches. Nineteen (19) of the 33 breached tank cars (58%) lost their entire load due to fire and/or spillage, which ignited and resulted in a large pool fire. Another 14 of the 33 breached tank cars (42%) lost part of their load. The remaining product was transferred during remediation operations. One (1) of the tank cars (the 24th car) had separated completely into 2 portions. Release from smaller breaches, while not instantaneous, also contributed to feeding the pool fire and to the spillage of product after the fire was extinguished. Shell breaches 2.7.2 Shell breaches were the second most important contributor to the release of product in terms of the size of the breach and the number of cars affected. The shells of 13 of the 37 tank cars examined by the TSB (35%) were breached from impact damage. Four tank cars had small punctures less than 1 foot in diameter, while the other 9 tank cars had larger shell breaches, with dimensions ranging from a few feet to the length of a shell ring as 1 car broke into 2 sections. The majority of shell breaches were punctures consistent with collisions with sharp smaller objects (e.g., couplers, trucks, bolsters), and a few tank cars exhibited fractures at sharp folds or buckles in the shell material. All of the shell breaches exhibited the features that were typical of ductile overstress failure (slanted fracture surfaces, plastic deformation, and rough fibrous appearance). There was no indication of brittle failure. Breaches caused by thermal tears 2.7.3 Most of the 37 tank cars examined by the TSB exhibited damage indicating that they had been exposed to the post-derailment fire. The fire damage ranged from scorched paint to changes in surface carbon content and external oxidation consistent with exposure to crude oil and air at a high temperature. Fifteen (15) of the 37 cars examined by the TSB (41%) exhibited thermal tears ranging from 18 inches to 240 inches long, indicating that they had been exposed to the post-derailment fire. Ten (10) of the 15 tank cars with thermal tears had no other breaches that might have contributed to the release of internal pressure. Of the 5 remaining tank cars with thermal tears, 3 tank cars also had bottom outlet valve (BOV) breaches, 1 tank car also had a head breach, and 1 tank car also had both a head breach and a BOV breach. All thermal tears were situated in the vapour space of the tank and displayed features consistent with ductile failure at a high temperature.
Railway Investigation Report R15H0021 | 87
None of the 15 tank cars with breaches caused by thermal tears were equipped with jackets or thermal protection. This suggests that the absence of tank car thermal protection likely increased the severity of the product release and further fuelled the fire. Although the 4 tank cars that were jacketed and insulated did not sustain thermal tears, 2 of these cars had other breaches that likely provided a release for the internal pressure, and 1 of the cars was partially submerged in the Makami River, which may have had a cooling effect on the tank car. Therefore, the extent to which the jackets and insulation were effective in delaying the internal build-up of pressure could not be determined. It was previously thought that PRDs with higher start-to-discharge pressure may pose a risk of building up excessive internal pressure during a fire, resulting in more energetic (larger) thermal tears. In this occurrence, 11 of the 15 tank cars with thermal tears were equipped with a 75 psig PRD. Thermal tear length on these cars ranged from 18 inches to 240 inches. In comparison, on the 4 tank cars equipped with a 165 psig PRD, thermal tear length ranged from 22 inches to 96 inches. Therefore, for the 15 tank cars that exhibited thermal tears, there was no evidence to support the hypothesis that PRDs with higher start-to-discharge pressure result in more energetic thermal tears. Head and head shield damage 2.7.4 Of the 37 derailed tank cars examined, all (100%) had some form of collision damage to their head shields, and 26 (70%) of the cars exhibited impact damage in one or both tank heads. Fifteen (41%) of the 37 tank cars were missing 1 head shield, and 2 (5%) tank cars had lost both. Most head shields separated due to broken attachment brackets. Seven (7) of the 37 tank cars (27%) sustained a head breach due to impact damage. The 4 tank cars equipped with jackets, insulation and full head shields (the 9th, 14th, 19th, and 29th cars) exhibited various degrees of head impact damage, but were not breached. This suggests that the jackets, insulation, and full head shields were more effective in protecting the tank heads against impact punctures during the derailment compared to the half-head shields. Manway, top fitting, and pressure relief device damage 2.7.5 The derailed cars were equipped with hinged and bolted manway covers. On 20 of the 37 derailed tank cars examined by the TSB, the manway cover had been opened during remediation operations. The manway covers of 11 tank cars were closed. Five (5) of the remaining 6 tank cars were breached from an impact-damaged manway. The protective housing of 18 of the 37 derailed tank cars (49%) had some form of impact damage. In most cases, the impact damage was relatively minor. Only 2 tank cars (the 16th and 24th cars) exhibited significant impact damage; the protective housings were completely separated from the top fitting nozzle cover. All of the top fittings of these 2 tank cars were sheared off and product was released.
88| Transportation Safety Board of Canada
The small number of tank cars with breached manways, top fittings, and PRDs suggests that the features incorporated for the protection of top-mounted appurtenances were generally effective in reducing the release of product. Bottom outlet valve damage 2.7.6 If a loaded tank car comes to rest in an inverted position after the top fittings have been compromised during a derailment, product can leak from the top fittings. Similarly, if the tank car comes to rest in an upright position and the BOV has been compromised, product can be released from the BOV. If the top fittings and the BOV are compromised, the fitting that comes to rest in the highest position can act as a vent, which can greatly increase the rate of flow from the other compromised appurtenance. To minimize and mitigate product release during a derailment, it is necessary to protect both the top fittings and the BOV. On 28 of the 37 cars examined, the BOV skid protection sustained some form of impact damage, ranging from deformation or crushing of the skid assembly to a broken skid and/or separated skid-to-shell weld. Most tank cars with damaged skids also had significant shell deformation in the vicinity of the skid, indicating that they had been subjected to large collision forces. With regard to the BOV handle assembly and securement mechanism: • Twenty-eight (28) of the 37 tank cars examined (76%) had some form of impact damage, ranging from impact-related deformation to complete separation of the handle assembly and securement mechanism. • The BOV adaptor was sheared off at the mounting flange (the intended breaking point) on 20 of the tank cars, causing the BOV ball to be exposed. With the exception of the 31st and 41st cars, these cars also had impact-damaged or missing BOV handles. • Of the 20 tank cars with sheared-off BOV adaptors, 13 (65%) (the 7th, 11th, 19th, 21st, 22th, 23rd, 24th, 31st, 32nd, 33rd, 34th, 37th, and 40th cars) had an open BOV, a partially open BOV, or a visibly leaking BOV ball. All of the tank cars with a breached BOV had an impact-damaged handle assembly. This highlights the vulnerability of BOVs during derailments and the need for a better BOV design for ball valves equipped with handles. TSB Rail Safety Advisory 15/13 and 3 previous TSB investigations (R15H0013, R13T0060, and R13D0054) have identified this issue relating to BOV damage and BOV handle design. In these occurrences, the BOV handle design for Class 111 tank cars was not sufficient to protect the ball valve from being actuated when the handle was broken off, deformed, or otherwise unintentionally moved during the derailment or site remediation. This risk was also identified during the National Transportation Safety Board (NTSB) investigation into the 2009 derailment of a CN freight train in Cherry Valley, Illinois. Problems with BOV handles have been repeatedly identified in other accident investigation reports. However, when the CPC-1232 tank car construction standards were issued, the
Railway Investigation Report R15H0021 | 89
recommended changes had not yet been implemented. Without modifications to the BOV handle design, these types of releases have continued to occur during derailments. In this occurrence, although the BOV handle designs met the AAR standards, the handles were exposed and moved during either the accident or site remediation, resulting in the release of product. The tank car BOV handle arrangement was inadequate to protect against product release during the derailment and contributed to the severity of the release. If BOV handles continue to be exposed without adequate protection, there is an increased risk of product release during a derailment and site remediation. Stub sill damage 2.7.7 Tank car stub sills are prohibited from being attached directly to the tank shell. The AAR requires that reinforcement pads be attached to the tank shell and that the stub sills be attached to the reinforcement pads. These requirements are intended to ensure that, if a stub sill is overloaded, the separation occurs between the sill and the reinforcement pad and does not propagate into the tank shell. In this occurrence, 31 of the 37 tank cars examined had sustained impact damage to at least 1 stub sill and/or coupler assembly, and 25 tank cars were damaged on both ends. While 6 of the tank cars separated at the stub sill attachment, none of the stub sill attachment separations caused a breach in a tank. 2.8 Tank car material properties In this occurrence, the tank car head and shell material met the requirements for chemical composition and tensile properties of the specified AAR TC128 Grade B normalized steel. Comparisons were made between the 63 legacy Class 111 tanks cars involved in the Lac- Mégantic occurrence (R13D0054) and the 68 Class 111 CPC-1232 compliant tank cars involved in this occurrence (R15H0021) and in the Gladwick occurrence (R15H0013). Although the CPC-1232 standard is an improvement over the legacy Class 111 tank cars, this standard does not seem to be sufficiently robust to ensure the safe transportation of Class 3 Packing Group I and Packing Group II products, when these tank cars are involved in higher-speed derailments. In this occurrence, the severity of the tank car impact and thermal damage, the subsequent release of product and post-derailment fire, as well as the damage to the environment, reinforce the ongoing TSB concern relating to trains carrying large volumes of flammable liquids. If flammable liquids continue to be transported in tank cars that are not sufficiently robust to prevent catastrophic failure when involved in an accident, the risk of DG release during a derailment will remain high. 2.9 New regulations for tank cars in flammable liquids service In May 2015, TC published in the Canada Gazette, Part II, amendments to the Transportation of Dangerous Goods Regulations that established requirements for a new flammable liquids tank car standard (TC-117), retrofit requirements for older tank cars in flammable liquids service,
90| Transportation Safety Board of Canada
and implementation timelines to modernize the Canadian tank car fleet. TC is also updating standard TP 14877, Containers for Transport of Dangerous Goods by Rail, which is the Canadian standard referenced in the Transportation of Dangerous Goods Regulations with regard to the TC-117 tank car construction. The standards and timelines were generally harmonized with the U.S. regulators, the Pipeline and Hazardous Materials Safety Administration, and the Federal Railroad Administration. With the coming into force of the U.S. Fixing America’s Surface Transportation Act, the U.S. has further harmonized with the Canadian requirements. The new regulations require that all new tank cars built for the transport of flammable liquids be constructed using even thicker and more impact-resistant steel, and that they be equipped with jacketed thermal protection, full-height head shields, top fittings protection, improved BOVs, and appropriate PRDs. The Railway Association of Canada and industry continue to support improvement in tank car standards. However, transitioning to the new TC-117 and retrofitted tank cars with further enhanced protection that are now required by regulation to transport a number of Class 3 flammable liquids by rail, will take some time. In light of a number of significant derailments which have resulted in the release of flammable liquids, loss of life, and damage to the environment, if the new tank car standards are not fully implemented in a timely manner, there is a continued risk of product loss and associated consequences when tank cars carrying flammable liquids are involved in a derailment. In the meantime, as the industry works through the transition to the new TC-117 and retrofitted tank cars, risk control measures, such as speed reduction for key trains and risk assessments for key routes, need to be managed effectively. 2.10 Key train speed Kinetic energy is a function of mass times speed squared. During a derailment, a train loses kinetic energy as the energy is consumed by the forces involved in the derailment and as the train comes to a stop. In comparison to a lighter train, a heavier train (e.g., a crude oil unit train) has greater momentum and requires more energy to slow down and more distance to stop. It is well understood in the industry that, when train speed is increased, more cars will derail when the train is involved in a derailment. While train speed is a primary factor in the severity of an outcome of a derailment, the weight of the cars involved also plays a role, as heavier cars will gain more momentum when train speed increases and will take more effort to stop. When heavier tank cars are loaded with DGs, the risk of a release and the potential consequences resulting from a derailment are also elevated. For example, in the Gladwick occurrence (R15H0013), the train was travelling at 38 mph and 29 cars derailed. In this occurrence (R15H0021), the train was travelling at 43 mph and 39 cars derailed. In both cases, the trains involved were crude oil unit trains and were being operated in a similar manner on tangent track when the derailments occurred. Regulators have recognized the role that speed plays in the severity of outcomes during a derailment and have put measures in place to limit the speed of key trains under certain
Railway Investigation Report R15H0021 | 91
conditions. Following the Lac-Mégantic occurrence, on 23 April 2014, TC issued Ministerial Order (MO) 14-01, requiring railways to limit key train speed to 40 mph through a census metropolitan area (CMA) and perform risk assessments for key routes. The MO continued to be reissued until February 2016, when the TC-approved Rules Respecting Key Trains and Key Routes came into force. The Rules Respecting Key Trains and Key Routes require railways to restrict key trains to a maximum speed of 50 mph and to further restrict key trains to a maximum speed of 40 mph within the core and secondary core of a CMA. In addition, the rules require railways to restrict key trains transporting DOT-111 loaded tank cars containing a number of Class 3 flammable liquids to a maximum speed of 40 mph in areas identified as higher risk through the risk assessment process also required by the rules. The DOT-111 tank cars also includes those that were constructed to the CPC-1232 specification, such as those transported by the occurrence train. Despite the CMA speed restriction of 40 mph for a unit train hauling Class 3 flammable liquids, no detailed engineering analysis had been performed to assess the effect of the speed reduction on the severity of a derailment. The occurrence train was designated as a key train and was operating on a key route. The accident occurred at 43 mph, which was lower than both the authorized track speed of 50 mph and the maximum speed of 50 mph permitted by the MO in place at the time of the accident and by the present Rules Respecting Key Trains and Key Routes. The speed of the petroleum crude oil unit train increased the severity of the outcome. During the Gladwick investigation (R15H0013), it was determined that the speed of the train had increased the severity of the outcome. As the Board was concerned that the speed restrictions outlined in the Rules Respecting Key Trains and Key Routes might not be sufficient for some key trains, particularly for unit trains transporting Class 3 flammable liquids in tank cars that do not meet the TC-117 standard, the Board recommended that: The Department of Transport conduct a study on the factors that increase the severity of the outcomes for derailments involving dangerous goods, identify appropriate mitigating strategies including train speeds for various train risk profiles and amend the Rules Respecting Key Trains and Key Routes accordingly. TSB Recommendation R17-01 In the Gogama occurrence (R15H0021), 33 of the 39 derailed tank cars (85%) were breached and released about 2.6 million litres of petroleum crude oil (UN1267) to atmosphere, water, or surface. Nineteen (19) of the 33 breached tank cars (58%) lost their entire load due to fire and/or spillage. The released product ignited, caused explosions, resulted in a large pool fire, and contaminated the nearby Makami River. The product ignited and fires burned for 3 days. Although the accident occurred near the town of Gogama and there were no injuries, the accident impacted the environment and required significant post-accident restoration work. Had the accident occurred within a town, city, or metropolitan area, the outcome could have been even more severe. The severity of the outcome at 43 mph suggests that speed restrictions of 50 mph which were in place at the time of the accident would not reduce the severity of a derailment and are not sufficient for unit trains transporting Class 3 flammable liquids.
92| Transportation Safety Board of Canada
General merchandise trains, which often transport DG tank cars dispersed throughout the train, are generally exposed to less risk in a derailment because the derailment can occur in an area of the train that is transporting few or no DG tank cars. Unit trains of DG tank cars transporting Class 3 flammable liquids, meanwhile, have a different risk profile. When a derailment occurs at or near track speed and involves a unit train transporting Class 3 flammable liquids, the risk of release and adverse consequences is high no matter where the derailment occurs within the train, because all of the cars are carrying Class 3 flammable liquids. If train speed is not adequately restricted for unit trains transporting Class 3 flammable liquids, there is an increased risk of product release and adverse consequence when the train is involved in a derailment. Key train speed through a census metropolitan area 2.10.1 A CMA, as defined by Statistics Canada, is an area of one or more neighbouring municipalities situated around a core. A CMA has a total population of at least 100 000, of which 50 000 or more live in the core. A census agglomeration (the secondary core) has a population of at least 10 000. Most CMAs are geographically located on a major rail line. In 2016, there were 33 cities that met the criteria of a CMA, with a combined total population of 25 164 200 people (i.e., about 69% of the Canadian population). The Rules Respecting Key Trains and Key Routes require railways to restrict key trains to a maximum speed of 50 mph, and to further restrict key trains to a maximum speed of 40 mph within the core and secondary core of a CMA. This means that train speed would be restricted through areas that contain about 69% of the Canadian population. However, the majority of towns located along a rail line do not meet the criteria of a CMA and therefore the 40 mph speed restriction of the Rules Respecting Key Trains and Key Routes does not apply. 2.11 Rail fatigue life Traffic over the Ruel Subdivision had increased by 21% since 2013, due in part to a large increase in unit oil train traffic. Heavy unit trains carrying any product are known to concentrate the train forces on track irregularities such as localized surface collapse (LSC), rail end batter (REB), and crushed head (CH) rail surface conditions. LSC, REB and CH conditions have increased on the Ruel Subdivision since 2013. Monitoring these conditions is time-consuming, and replacement of rail containing LSC and CH creates joints in continuous welded rail that can progress to REB defects if the joints are not properly maintained. These rail surface conditions occurred mainly in the older Sydney and Algoma rail. Although the total accumulated tonnage was unknown and the rail was not near its wear limit, the increased tonnage, which included the introduction of unit crude oil trains on the Ruel Subdivision, was likely contributing to a fatigue regime that manifested itself by the increased number of LSC, REB, and CH rail surface conditions. In this occurrence, the VSH defect that led to the derailment did not develop due to an LSC defect, but the REB associated with the improper rail repair likely accelerated the growth of
Railway Investigation Report R15H0021 | 93
the VSH after the repair was made. The VSH defect that caused a derailment in Minnipuka, Ontario (TSB railway occurrence R15H0020) likely developed more rapidly due to the presence of an LSC in the vicinity of the point of derailment. The increased number of LSC conditions, particularly in older rail which may be at or near its fatigue limit, can be subject to wheel impact forces that will result in higher contact stresses and contribute to the development of other rail defects such as VSHs. If emerging LSC, REB and CH rail surface conditions are not fully considered as part of the risk assessment used to plan for regulatory inspections and for railways to develop rail replacement programs, there is an increased risk that problematic sections of rail may not be identified and remediated. 2.12 Canadian National Railway Company key route corridor risk assessment In Railway Safety Issues Investigation (SII) R05-01, the TSB studied a series of occurrences and identified an imbalance between infrastructure maintenance and increases in the volume of bulk traffic. The study determined that, although railways recognize that the rate of track degradation was accelerated with increases in bulk unit train tonnage, an appropriate balance between increased track degradation and timely infrastructure maintenance and/or renewal was not always achieved. The study highlighted that compliance with the Track Safety Rules alone was not sufficient to ensure safety and emphasized the need for proactive SMS processes to anticipate operational conditions that could lead to a degradation of safety margins. The TSB Watchlist has also emphasized the need for SMS to be implemented effectively to ensure that hazards are proactively identified and risks are maintained at an acceptable level. Between 2010 and 2014, rail traffic tonnage on the Ruel Subdivision increased by 44%. During that same time, the transport of petroleum crude oil by rail increased significantly, accounting for 46% of the rail traffic tonnage increase. Much of the petroleum crude oil was being transported in bulk unit trains with Class 111 tank cars which were built to the CPC- 1232 standard and had a 286 000 GRL capacity. Although the track in the vicinity of the derailment was continually maintained to Class 4 standards, the potential for more rapid degradation of track infrastructure due to a 44% increase in traffic tonnage, much of which was transported in heavier rail cars, was not recognized. While CN’s SMS called for risk assessments in response to significant changes in business, including changes in traffic volumes or types of product, there was no definition as to what constituted a “significant change.” The scope of CN’s risk assessment examined the hazards associated with the transportation of DGs between Winnipeg and Toronto, and identified the need for increased emergency response supplies on the Ruel Subdivision. However, CN did not anticipate the impact of the increased traffic and tonnage or the ability to maintain adequate track safety margins on the Ruel Subdivision. These increases did not prompt a proactive review of the April 2014 CN risk assessment.
94| Transportation Safety Board of Canada
The risk assessment did not identify mitigation strategies to help meet increased track maintenance demands resulting from increased traffic and tonnage or to assess their impacts, particularly on older Sydney rail throughout the Ruel Subdivision that was more prone to VSH failures, as demonstrated by derailments at Minnipuka on 05 March 2015 and Gogama 2 days later. CN managed the balance between increased traffic and maintenance activities through lagging indicators such as increased inspections, track testing, implementation of slow orders, incidents, and accidents. CN did not have a clear definition as to what constituted a significant change in business, such as volumes and products transported, that would prompt a review of the risk assessment. As a result, CN’s SMS relied on reactive indicators and did not anticipate the need for increased track maintenance in light of significant increases in DG volumes and traffic tonnage. Freight cars are typically equipped with 8 wheels (4 wheel set assemblies, each of which contains 2 wheels). For a loaded freight car with a GRL capacity of 263 000 pounds, such as a legacy Class 111 tank car, each wheel will carry 32 875 pounds. In comparison, for a loaded freight car with a GRL capacity of 286 000 pounds, such as a Class 111 tank car built to the CPC-1232 standard, each wheel will carry 35 750 pounds (about 2875 pounds more per wheel than a car with a GRL capacity of 263 000 pounds). The load imposed on the rail is one factor; the number of cycles also plays a role. For example, it would take between 110 and 113 cars with a 263 000 GRL capacity to carry the same amount of product as 100 cars with a 286 000 GRL capacity. While cars with a 286 000 GRL capacity impose an 8.8% higher load on the rail than cars with a 263 000 GRL capacity, cars with a 263 000 GRL capacity would introduce 10% to 13% more cycles into the track structure. However, the additional weight of cars with a GRL capacity of 286 000 pounds can also lead to more rapid deterioration of track infrastructure due to the higher wheel impacts and greater deflection, particularly in areas where rail end mismatch or LSC and REB conditions were present. In this occurrence, the VSH progressed to brittle failure just 2 days after the repair. The short, 2.5 inch (60 mm) transition ramp acted more as a step, creating the potential for calculated wheel impacts of up to approximately 140 kips as wheels transitioned between the higher plug rail repair and the lower east end of the parent rail, which also had a pre-existing VSH. If risk assessments do not adequately consider increases in traffic tonnage, the use of heavier rail cars, and the potential for more rapidly degrading track structure, regular track maintenance activities may no longer be sufficient to maintain track to the required standards, increasing the risk of track infrastructure failures. 2.13 Regulatory oversight for the Ruel Subdivision In conjunction with TC’s responsibilities relating to oversight to ensure regulatory compliance, TC railway engineering inspectors conduct railway infrastructure inspections across Canada. Subdivisions are not necessarily subject to regular inspections. Instead, TC uses a risk-based approach that considers various factors to identify areas that require
Railway Investigation Report R15H0021 | 95
targeted inspection. In this occurrence, a significant increase in overall tonnage and DG traffic did not result in the Ruel Subdivision being selected for more frequent targeted inspections, despite its being one of CN’s primary rail corridors. Before the accident, TC’s last visual track inspection in the vicinity of the derailment was conducted in 2012, and before that, in 2010. Between 2013 and the date of the occurrence, TC did not perform any track inspections on the Ruel Subdivision because the number of geometry defects appeared to be decreasing. However, between 2010 and 2014, there was a 30% increase in traffic on the Ruel Subdivision, and crude oil traffic accounted for 46% of this traffic increase. In mid-March 2015, following the 3 accidents on the Ruel Subdivision, TC inspected the entire Ruel Subdivision and identified a total of 67 non-compliant conditions that required remedial action, as well as 59 other concerns and observations. These conditions had likely evolved since the last TC regulatory inspection (in 2012), and had existed before the accident, yet they went undetected despite regular railway inspection. Since May 2014, there have been 5 other TSB investigations where inspections conducted by the railway and/or TC did not identify degrading track conditions. With further deterioration of the track structure, a derailment ultimately resulted. In 3 of the 5 occurrences, track joint or rail failure occurred in the immediate vicinity of pre-existing rail surface conditions which, although not condemnable, were being monitored by the railway at the time. In 4 of the 5 occurrences, the most recent TC regulatory inspections conducted before the accident were in 2012, after which TC planning for regulatory track inspections did not identify the subdivisions for track inspection. In each of these occurrences, railway track maintenance practices were not adequate and had placed the track infrastructure at risk. The regulatory oversight did not identify the ineffective railway track maintenance, and the track further deteriorated until a derailment occurred. It was only after the 4 accidents that TC took significant steps to ensure that appropriate track remediation was completed. Maintenance programs must be implemented in a timely manner to ensure that risks are adequately mitigated. Regulatory inspections are equally important to ensure compliance. While SMS regulations call on companies to perform risk assessments in response to significant changes in business (volumes or product), the same changes in business do not necessarily prompt a TC review of subdivision condition or the need for additional regulatory inspections. If the risk-based approach to planning regulatory track inspections does not consider all relevant operational factors, including increases in rail traffic tonnage and dangerous goods volumes as well as emerging leading indicators of potential track degradation such as localized surface collapse, rail end batter, and crushed head rail surface conditions, the targeted inspections may not be well focused, increasing the risk that degrading track conditions will go undetected.
96| Transportation Safety Board of Canada
- 14 Emergency response
The location of the accident meant that there was good access to the site, which facilitated site remediation activities. CN and the Gogama fire service immediately implemented a unified incident command system. With cooperation from the local municipality, the Gogama town hall, located approximately 2 miles northeast of the derailment site, was established as the incident command centre. This centre served as a location for internal and external responders to provide updates on remediation plans, site mitigation progress, operational recovery plans, and other safety concerns. CN’s remediation plans were shared with all responders and local stakeholders at regular meetings. Other response agencies established work centres within the incident command centre to coordinate activities. The centre also provided relief to responders from the weather, and hot meals were available to responders and support personnel around the clock. Two CN mobile command posts were positioned at the east and west ends of the site perimeter. Both command posts were equipped with food, water, first aid equipment, and replacement safety equipment to be distributed to personnel as necessary. Secondary job briefings and direction regarding remediation plans were also coordinated and communicated from these facilities. Four days into the derailment cleanup, CN chaired a detailed information session involving provincial and municipal officials, First Nations chiefs and elders, response agencies, and residents of Gogama. Remediation activities continued to be well coordinated. Despite the challenges of responding to a major rail accident and subsequent fire, the emergency response was effective and inclusive. 2.15 Environmental impact Potential environmental impacts were investigated by the appropriate parties. Impacted wastewater was treated, while surface water and groundwater showed no impacts. Impacted soil was excavated and shipped off-site for disposal. A containment basin was constructed along the CN right-of-way to catch any remaining product that might seep out of the ballast. Impacted sediment has also been removed and disposed of off-site. Site restoration, which included a diverse planting program to return the lost vegetation species that were native to the area, was completed with the assistance of the local Mattagami First Nation in the summer of 2016. River and lake shoreline surface restoration was undertaken in the fall of 2016 and are ongoing. Despite these efforts, a thin sheen of oil on the river surface and some dead fish were reported by concerned citizens during the summer of 2016. CN acted on these concerns and continued to sample and test the soil, sediment, and water in the areas identified. Tests were also conducted on some of the dead fish. Initially, an independent review determined that the test results met regulatory standards, and the results were shared with community leaders. However, at the time that this TSB investigation report was released, Environment
Railway Investigation Report R15H0021 | 97
and Climate Change Canada was continuing to investigate alleged violations of the pollution prevention provisions of the Fisheries Act related to this accident. In the fall of 2016, CN re-established a consultation panel of experts to address local residents’ concerns. All parties agreed that additional riverbed dredging operations should be conducted within the area of the rail bridge and in 2 areas just south of the road bridge. The riverbed in each of these 3 areas was vacuumed, then dredged and completely cleared of sediment. The riverbed was then restored by placing a layer of clean pit stone covered with pea gravel. Although the environmental plan was comprehensive and significant mitigating strategies were put in place, site monitoring is ongoing and concerns about the possible contamination of the watershed remain.
98| Transportation Safety Board of Canada
- 0 Findings
- 1
Findings as to cause and contributing factors 1. Prior to the arrival of the train, a 16-inch-long portion of the parent south rail head had broken off due to a vertical split head rail failure within the east joint of a plug rail repair, leaving a gap in the south rail. 2. The derailment occurred when the south rail failed catastrophically beneath the train as it traversed the track, resulting in the derailment of the 6th to 44th tank cars, which were loaded with petroleum crude oil. 3. During the plug rail repair 3 days before the derailment, the parent rail was cut and the exposed rail ends were visually inspected for cracks with no defects noted. However, the snow patrol foreman did not perform a dye penetrant test on the cut rail ends as required by CN Engineering Track Standards section 1.7. 4. No specific guidance was provided to CN engineering employees relating to the length of grinding required when a rail end mismatch occurs during plug rail repairs. 5. The 2.5 inch (60 mm) long transition zone created by grinding the plug rail was ineffective and created an abrupt change in rail head height that increased the dynamic loads applied to the east end parent rail head, which also contained a vertical split head defect, and caused the rail to fail. 6. Given the state of the plug rail repair and short transition between rail end mismatch at the east end joint, a slow order should have been placed on the track. 7. The snow patrol foreman was aware of the dye penetrant test but had never performed one before or seen it performed. 8. The online training at CN relating to dye penetrant testing did not specifically highlight the importance of the test as part of plug rail repairs or provide opportunities for practical hands-on training. 9. The large quantities of spilled product, the rapid release of the product, as well as the product’s high volatility and low viscosity, contributed to the ignition of large post- crash fires and the pool fire. 10. The absence of tank car thermal protection likely increased the severity of the product release, further fuelling the fire as 15 tank cars sustained thermal tears after exposure to the pool fire. 11. The tank car bottom outlet valve handle arrangement was inadequate to protect against product release during the derailment and contributed to the severity of the release.
Railway Investigation Report R15H0021 | 99
The speed of the petroleum crude oil unit train increased the severity of the outcome.
The severity of the outcome at 43 mph suggests that speed restrictions of 50 mph, which were in place at the time of the accident, would not reduce the severity of a derailment and are not sufficient for unit trains transporting Class 3 flammable liquids. 3.2 Findings as to risk
If online training for safety-critical tasks is not reinforced by practical training, trainees may not fully comprehend the importance of critical steps within the task, increasing the risk that the task will not be adequately performed.
If infrequently performed safety-critical tasks are conducted from memory without the aid of a checklist or independent verification, steps that are important to properly complete the task can be inadvertently omitted, increasing the risk that the task will not be adequately performed.
If bottom outlet valve handles continue to be exposed without adequate protection, there is an increased risk of product release during a derailment and site remediation.
If flammable liquids continue to be transported in tank cars that are not sufficiently robust to prevent catastrophic failure when involved in an accident, the risk of dangerous goods release during a derailment will remain high.
If the new tank car standards are not fully implemented in a timely manner, there is a continued risk of product loss and associated consequences when tank cars carrying flammable liquids are involved in a derailment.
If train speed is not adequately restricted for unit trains transporting Class 3 flammable liquids, there is an increased risk of product release and adverse consequences when the train is involved in a derailment.
If emerging localized surface collapse, rail end batter, and crushed head rail surface conditions are not fully considered as part of the risk assessment used to plan for regulatory inspections and for railways to develop rail replacement programs, there is an increased risk that problematic sections of rail may not be identified and remediated.
If risk assessments do not adequately consider increases in traffic tonnage, the use of heavier rail cars, and the potential for more rapidly degrading track structure, regular track maintenance activities may no longer be sufficient to maintain track to the required standards, increasing the risk of track infrastructure failures.
If the risk-based approach to planning regulatory track inspections does not consider all relevant operational factors, including increases in rail traffic tonnage, increases in dangerous goods volumes and emerging leading indicators of track degradation such
100| Transportation Safety Board of Canada
as localized surface collapse, rail end batter, and crushed head rail surface conditions, the targeted inspections may not be well focused, increasing the risk that degrading track conditions will go undetected. 3.3 Other findings 1. Had a dye penetrant inspection been performed, a vertical split head indication would likely have been observed in the cut east rail end, and more of the east parent rail may have had to have been removed. 2. Although clearly visible in the broken thermite weld, the vertical split head defect that caused the rail to fail was either not present or too small to be detected during the ultrasonic test conducted on 02 March 2015 (i.e., 2 days before the broken rail occurred and 5 days before the derailment). 3. The extent to which the jacket and insulation were effective in delaying the internal build-up of pressure could not be determined. 4. For the 15 tank cars that exhibited thermal tears, there was no evidence to support the hypothesis that pressure relief devices with higher start-to-discharge pressure result in more energetic (larger) thermal tears. 5. The 4 CPC-1232 compliant tank cars which were equipped with jackets, insulation and full head shields were more effective in protecting the tank heads against impact punctures during the derailment compared to the half-head shields. 6. The small number of tank cars with breached manways, top fittings, and pressure relief devices suggests that the features incorporated for the protection of top mounted appurtenances were generally effective in reducing the release of product. 7. While 6 of the tank cars separated at the stub sill attachment, none of the stub sill attachment separations caused a breach in a tank. 8. The majority of towns located along a rail line do not meet the criteria of a census metropolitan area and therefore the 40 mph speed restriction of the Rules Respecting Key Trains and Key Routes does not apply. 9. CN’s safety management system relied on reactive indicators and did not anticipate the need for increased track maintenance in light of significant increases in dangerous goods volumes and traffic tonnage. 10. Despite the challenges of responding to a major rail accident and subsequent fire, the emergency response was effective and inclusive. 11. Although the environmental plan was comprehensive and significant mitigating strategies were put in place, site monitoring is ongoing and concerns remain about the possible contamination of the watershed.
Railway Investigation Report R15H0021 | 101
- 0 Safety action
- 1
Action taken Transportation Safety Board of Canada 4.1.1 On 17 March 2015, the TSB issued Rail Safety Advisory (RSA) letter 04/15 regarding the condition of track infrastructure on the Canadian National Railway Company’s (CN’s) Ruel Subdivision. The RSA suggested that, given the potential damage and consequences of a train derailment, particularly when petroleum crude oil unit trains are involved, Transport Canada (TC) should review the risk assessments conducted for the Ruel Subdivision, assess the track infrastructure condition, and determine whether additional risk control measures are required when operating a key train on this key route. Transport Canada 4.1.2 TC took the following action: • On 12 March 2015, TC issued a Notice to CN, as per the requirements of section 31 of the Railway Safety Act, raising concerns about the track condition on the Ruel Subdivision. • With respect to the track infrastructure, following this third derailment, TC’s Ontario Regional Office requested track inspection records from CN and also inspected the entire Ruel Subdivision between 15 March and 19 March 2015. A report summarizing the inspection findings was provided to CN. The TC inspection noted a total of 67 non- compliant conditions that required repair, and 59 other concerns and observations. • On 30 March 2015, CN responded to TC’s Notice with a description of the action plan the company implemented. The plan included operating at a reduced speed on the Ruel Subdivision, performing supplementary inspections, having additional analysis undertaken by experts outside the company on the possibility of distributed power reducing the severity of a derailment, and conducting a review of train-track forces associated with unit trains of crude oil. • On 07 May 2015, TC sent a Letter for Insufficient Action Taken to CN stating that, after the review and evaluation of the corrective measures outlined in the 30 March 2015 correspondence, TC was not satisfied that the action taken had addressed the hazard or condition posing the threat to safe railway operations. TC requested updates and additional information on CN’s findings and plans with respect to the recent derailments. • On 21 May 2015, CN responded to TC’s Letter for Insufficient Action Taken, providing the requested information, in particular the results of work that CN undertook to determine the root causes of the derailments, the conclusions from the analysis of distributed power benefits, measures taken to address turnout maintenance concerns, and CN’s analysis of adequacy of track time provided to employees for maintenance and inspection activities on the Ruel Subdivision. CN also included the status of risk mitigation actions, additional actions, and results of associated analyses.
102| Transportation Safety Board of Canada
• On 22 May 2015, CN advised TC that the temporary speed restriction of 35 mph across the Redditt, Allanwater, Carmat, and Ruel subdivisions (i.e., the Winnipeg to Capreol rail corridor) put in place immediately after the derailments would be lifted on 23 May 2015. CN indicated that the restriction was no longer required due to the measures taken within the first 60 days after the derailment. • On 02 June 2015, TC sent a letter to CN, indicating that TC officials would meet with CN officials to inspect the Ruel Subdivision and review the implementation, effectiveness, and adequacy of CN’s response to the Letter for Insufficient Action Taken. • Between 27 July and 30 July 2015, a joint track inspection was conducted with CN, with 15 deficiencies noted. CN responded on 13 August 2016 outlining its corrective actions. • In November 2015, TC implemented a Track Winter Inspection Program to monitor railway track maintenance activities during winter months. As part of this program, rail safety inspectors reviewed railway inspection documentation for particular track segments for elements such as repairs in continuous welded rail; rail wear measurement records; rail surface conditions records including localized surface collapse, crushed heads and rail end batter; and operating speed restrictions due to cold weather. The information gathered was used to measure railways’ adherence to regulatory requirements and their standards and best practices. • On 14 December 2015, the Section 31 Notice was lifted and a Letter of Sufficient Action Taken was issued. • In 2016, TC developed a methodology to overlay various data sources (such as rail and geometry failure data and traffic density (tonnage)) in order to consistently rank sections of track based on quantitative data contributing to increased operating risk for each region. Through their qualitative knowledge, regions were able to review this baseline information to supplement and guide their regional risk inspection program. Canadian National Railway Company 4.1.3 Shortly before this derailment, CN had experienced 2 other significant track-related derailments on the Ruel Subdivision. Following this occurrence on 07 March 2015, CN immediately implemented the following measures: Operating restrictions • A system-wide 35 mph speed restriction for key trains in census metropolitan areas was introduced. • A 35 mph temporary (60-day) speed restriction for key trains operating between Winnipeg and Capreol was introduced and subsequently lifted. Mechanical actions • Qualified mechanical personnel performed roll-by inspections of loaded crude oil trains at Hornepayne, Ontario, for 60 days following the occurrence.
Railway Investigation Report R15H0021 | 103
Engineering actions • The frequency of rail flaw ultrasonic track testing for the Ruel Subdivision was increased to once every 14 days from the previous winter interval of 20 days. A subsequent review of the test results indicated that the Ruel Subdivision had similar defect volume per mile tested ratios as compared with other Winnipeg-to-Toronto corridor subdivisions. Consequently, the testing interval later reverted back to 20 days. • CN and Sperry Rail Service carried out a review of rail flaw detector (RFD) tapes for those inspections performed immediately following the derailment. Thirty-seven tape- indicated locations from several RFD tapes were hand tested. The results confirmed that the RFD equipment was performing as expected. • Localized surface collapse and rail end batter criteria contained in CN Engineering Track Standards TS 1.7 (10a) and (10b) were superseded by the more restrictive CN Amalgamated Ruel Subdivision Action Plan dated 12 March 2015. • Additional engineering management staff from other CN regions were brought into the Northern Ontario Zone to review the territory and evaluate areas of opportunity for enhancing the skillsets of track personnel who perform inspections. • Investment in rail, ties, and surfacing was increased in 2015 from $10 million to $20 million. Capital track maintenance work programs began throughout the spring and summer of 2015. Two complete mainline turnouts were installed, and 17 mainline switch points and stock rails, and 27 mainline frogs, were changed out. Approximately 44 miles of new rail was laid and 216 miles of track was resurfaced. Approximately 30 miles of track was re-gauged with wood plugs or concrete insulators, 773 butt welds were installed to eliminate joints, and about 37 000 concrete or wood ties were installed. • In 2015, CN added a new 40-hour Advanced Track Inspection course to the Assistant Track Supervisor program. The course provides analytical tools and focuses on the root causes of defects, including items specific to rail joints. The course also has elements for enhanced field mentoring and oversight. • CN Track Maintainer training was modified to include practical training on dye penetrant testing as part of the rail cutting process. In addition, videos highlighting the importance of dye penetrant testing and demonstrating the correct process were incorporated into multiple training programs and made available to all existing employees. • Dye penetrant testing, which is part of a CN standard, must now be confirmed to ensure the test has been performed. A slow order is required if the dye penetrant test is not performed when changing out a broken rail. • CN developed and implemented 5 Critical Task Checklists (CT) for the most important safety-related tasks in engineering, including changing out a broken rail and performing a dye penetrant test. The checklists were developed to help field personnel ensure that the proper steps are followed when performing track repairs. The checklists include a signoff to validate that work has been performed in accordance with CN standards.
104| Transportation Safety Board of Canada
- 2
Action required Use of leading indicators when planning for regulatory track inspections 4.2.1 Railway companies are responsible for the safety of their operations and for being in compliance with all regulatory requirements. In many cases, with regard to track inspection, railways have additional standards that supplement or exceed the Transport Canada (TC)– approved Rules Respecting Track Safety (TSR). TC is responsible for ensuring regulatory compliance through compliance monitoring, inspections and audits. Individual railway subdivisions are not necessarily subject to a regular schedule of TC inspections. Instead, TC uses a risk-based approach that considers various factors to identify specific subdivisions or areas of subdivisions that require targeted inspection. TC prioritizes inspections by considering different operational factors including but not limited to rail and geometry defects, passenger trains and high operating speeds, and tonnage. There are 3 components to TC’s risk-based approach: • TC Headquarters develops a national inspection plan for the next year using a statistical model, identifies the number of inspections, and targets companies that are to receive these inspections. • TC regions focus on specific recurring issues requiring closer monitoring using a risk- based business planning process to identify the companies that are to receive these inspections. • TC performs unplanned inspections that respond to emerging issues such as rail accidents. For the national inspection plan, regional functional groups rank the subdivisions, yards, and maintenance facilities according to risk. Factors considered include accident history, compliance with standards and regulations, changes in operations, amount and type of traffic, hours of work, type of work performed, previous TC and railway inspections, and maintenance history. While a significant increase in overall freight or DG traffic or other indicators may be considered, they do not necessarily influence which subdivisions are planned for inspection. However, despite the planning process, there appears to be gaps in the type of data used for planning the targeted regulatory track inspections. Since May 2014, there were 5 other TSB investigations where either a track joint or rail failure occurred in the immediate vicinity of pre-existing localized surface collapse (LSC) or rail end batter (REB) conditions and/or a regulatory track inspection had not been conducted in over 2 years. Specifically: • In 3 of the 5 occurrences, track joint or rail failure occurred in the immediate vicinity of pre-existing LSC or REB rail surface conditions which, although not condemnable, were being monitored by the railway at the time. • In 4 of the 5 occurrences, the most recent TC regulatory inspections conducted prior to the accident were in 2012, after which TC planning for regulatory track inspections did not identify the subdivisions for planned track inspections. In each of these occurrences, railway track maintenance practices were not adequate and had placed
Railway Investigation Report R15H0021 | 105
the track infrastructure at risk. The regulatory oversight did not identify the ineffective railway track maintenance and the track further deteriorated until a derailment occurred. Rail flaw technology to detect LSC, REB, and crushed head (CH) rail surface conditions is relatively new. To detect and record these conditions, some railways have developed comparable, but not harmonized, thresholds. Before this technology was implemented, these conditions were usually detected by visual inspection, but relatively few were identified. After the technology was implemented, the number of identified rail surface conditions increased significantly. On the Ruel Subdivision, between January 2014 and March 2015, LSC, REB, and CH rail surface conditions accounted for about 76% of the 570 rail defects and conditions identified by rail flaw testing. These conditions also represented a significant increase in workload as they required additional monitoring and/or repair by the railway. LSC, REB, or CH rail surface conditions are leading indicators of deteriorating rail but the TSR contains no guidance or condemning criteria for them. If not properly addressed in the field, REBs can result in joint failure and derailment. LSCs, REBs, and CHs can result in high contact stresses and can lead to or accelerate the development of other rail defects such as a transverse detail defect (TDD) or a vertical split head (VSH) which can fail rapidly and result in a derailment. However, information for these emerging rail surface conditions is not generally provided to TC, specifically considered as part of TC’s risk-based approach, or reviewed by TC for any increase in the number of these conditions. With more complete LSC, REB, and CH data, TC’s risk-based approach for planning targeted regulatory track inspections can be augmented using this valuable information relating to leading indicators of degrading track conditions. The absence of this information represents a gap in TC’s planning process, which can result in targeted inspections that are not well focused. Therefore, the Board recommends that: The Department of Transport acquire rail surface condition data, including information on localized surface collapse, rail end batter and crushed heads, and incorporate it into its risk-based planning approach for targeted regulatory track inspections. TSB Recommendation R17-02 This report concludes the Transportation Safety Board’s investigation into this occurrence. The Board authorized the release of this report on 27 June 2017. It was officially released on 03 August 2017. Visit the Transportation Safety Board’s website (www.tsb.gc.ca) for information about the TSB and its products and services. You will also find the Watchlist, which identifies the transportation safety issues that pose the greatest risk to Canadians. In each case, the TSB has found that actions taken to date are inadequate, and that industry and regulators need to take additional concrete measures to eliminate the risks.
106| Transportation Safety Board of Canada
Appendices Appendix A – Other TSB investigations R14W0137 – CN derailment on Fort Frances Subdivision, 23 May 2014 On 23 May 2014, at approximately 1408 Central Daylight Time, CN freight train M34641-23 was proceeding eastward at 46 mph on the CN Fort Frances Subdivision when 35 cars derailed at Mile 93.38 near Fort Frances, Ontario. The derailed cars included 2 tank cars loaded with molten sulphur (UN 2448), 1 of which was punctured and released product. The product ignited a small grass fire that subsequently burned itself out. There were no injuries. 86 Since 2008, the volume of traffic on the Fort Frances Subdivision had steadily increased, exceeding 60 million gross ton-miles per mile in 2013. The track structure in the vicinity of the derailment had been rapidly degrading over the previous 2 years. Since 2012, the section of track from Mile 90.2 to Mile 94.0 had been experiencing recurring defect conditions, such as excessive rail cant and narrow gauge, which were generally related to tie deterioration. Before the accident, TC’s last recorded visual track inspection in the vicinity of the derailment had been conducted on 28 August 2012. Defective ties were noted between Mile 87.5 and Mile 87.7, but no track defects were noted between Mile 87.7 and Mile 102.0. Given that CN was aware of the deteriorating ties throughout the subdivision and had planned tie renewals for 2013 and 2014, it is likely that the track was exhibiting signs of deterioration at the time of the 2012 TC inspection. CN had informed TC that it would be implementing a number of tie replacement programs to improve the track condition. However, prior to the accident, the CN tie replacement programs were not fully completed. The TSB investigation determined that the condition of the Fort Frances Subdivision had degraded to that of Class 2 track without a corresponding reduction in speed initiated by the company or through regulatory enforcement. Following the accident, on 28 May 2014, TC provided a Notice and Order to CN restricting speeds between Mile 90.2 and Mile 142.8 to 25 mph. With regard to track maintenance and regulatory overview, the investigation determined (in part) that: • The accident occurred when the track misalignment at Mile 93.38 buckled sharply beneath the train, leading to the derailment of the 31st to 65th cars. • Despite an increase in rail traffic and tonnage, track maintenance programs were delayed on track that was already showing signs of deterioration, and no mitigation strategies such as speed reductions were applied.
86 TSB Railway Investigation Report R14W0137.
Railway Investigation Report R15H0021 | 107
• CN’s Engineering Track Standards were not consistently applied. Without proper maintenance and restoration activities, the track condition near Mile 93.38 worsened until the track could no longer restrain the normal operating forces imparted by train brakes and the temperature-related compressive forces that had built up within the rail. • Despite CN’s company maintenance and TC’s regulatory inspection activities before the accident, the weakened track structure was not being adequately repaired or being protected by slow orders. • If TC inspection and enforcement activities do not ensure that timely maintenance action is taken when track deterioration is evident, the risk of deteriorating track infrastructure leading to derailment is increased. • If key route corridor risk assessments do not consider when capital programs are delayed and deferred, the track can continue to deteriorate rapidly, increasing the risk for track-related derailments. R14W0256 - CN derailment on Margo Subdivision, 07 October 2014 On 07 October 2014, at approximately 1135 Central Standard Time, Canadian National Railway (CN) freight train A40541-05 was proceeding westward on the CN Margo Subdivision when it derailed 26 cars, including 6 tank cars loaded with dangerous goods, at Mile 74.58 near Clair, Saskatchewan. Two of the tank cars loaded with petroleum distillates (UN 1268) released product that subsequently caught fire. As a precaution, approximately 50 residents within a two-mile radius were evacuated and Provincial Highway 5 was closed. Approximately 650 feet of track was destroyed. There were no injuries.87 A transverse detail defect (TDD) had initiated from head check cracks at the upper gauge corner of the rail head. Over time, the crack had progressed in normal fatigue growth to about 20% of the cross-sectional area of the rail head. The TDD had then experienced more recent growth to about 85% of the cross-sectional area of the rail head and once it could no longer support service loads, the remaining rail section then failed in overstress. The TDD had developed within a previously identified LSC. However, the poor rail surface condition at that location inhibited the transmission of the UT signals into the rail head and likely masked the presence of a TDD during the UT test. R15H0092 – HCRY derailment on Webbwood Subdivision, 01 November 2015 On 01 November 2015, at approximately 2250 Eastern Standard Time, Huron Central Railway (HCRY) freight train SUSM-01 was proceeding westward on the Webbwood Subdivision at 25 mph when a train-initiated emergency brake application occurred at Mile 72.08, near Spanish, Ontario. Two separate groups of equipment derailed: 3 locomotives
87 TSB Railway Investigation Report R14W0256.
108| Transportation Safety Board of Canada
and 8 cars on the head end and 5 cars near the middle of the train. Approximately 225 feet of roadbed was destroyed. No dangerous goods were involved, and there were no injuries.88 HCRY is a provincially regulated shortline freight railway that operates on the Webbwood Subdivision from Sudbury, Ontario (Mile 4.8), westward to Sault Ste. Marie, Ontario (Mile 180.7). The Ministry of Transportation of Ontario (MTO) issues provincial railway licenses and is responsible for oversight but did not have the organizational structure or railway expertise necessary for full regulatory oversight of provincial railways. Through a memorandum of understanding (MOU) between MTO and TC, rail safety inspections and the related regulatory functions for the provincial railway was performed by TC. With regard to track inspection, TC used the same risk-based approach for these provincial shortlines as it did for federally regulated railways. When compared to federal railways, the provincial railways in Ontario typically operate on a lower class of track with reduced speeds and traffic. As such, the provincial railways would not normally have a risk profile that would require frequent regulatory track inspections. Therefore, the Ontario provincial railways were typically on a 3- to 5- year rotating inspection schedule. Federally regulated railways typically have track geometry data and rail ultrasonic inspection results available, allowing TC to consider this information when determining the level of risk for the B-component inspections. In comparison, MTO would have had to request the information from the provincially regulated railways in order to provide it to TC. However, no process was in place to obtain this information. Therefore, track geometry data and rail ultrasonic inspection results were not provided to TC and were not taken into consideration. Prior to the accident, TC conducted a track inspection from Mile 4.8 to Mile 177.0 of the Webbwood Subdivision in September 2012 which identified 66 track geometry “urgent” defects. TC did not conduct any other regulatory track inspections until after the accident. Shortly after the accident, in early November 2015, TC performed a planned track inspection on the Webbwood Subdivision between Mile 77.03 and Mile 175.0. This inspection identified 244 non-compliant conditions, which included 221 joints with missing bolts and 21 other concerns and observations. With regard to track maintenance and regulatory overview, the investigation determined (in part) that:
- HCRY track maintenance practices were ineffective and compromised safety, placing
the track infrastructure at risk.
- Although track geometry and ultrasonic rail tests had been performed on the
Webbwood Subdivision, MTO did not request the information from HCRY. As this
88 TSB Railway Investigation Report R15H0092.
Railway Investigation Report R15H0021 | 109
information was not made available to TC, it was not considered during TC’s annual risk–based review to determine which subdivisions to inspect the following year.
- If the information required for TC railway risk assessments is not accurate or
available, a railway’s risk profile may not be accurately depicted, increasing the risk that the type and frequency of regulatory inspections will not be sufficient to assess rail safety. R15H0013 – CN derailment at Gladwick, Ontario, 14 February 2015 On 14 February 2015, at about 2335 Eastern Standard Time, Canadian National Railway (CN) crude oil unit train U70451-10 was proceeding eastward at about 38 mph on CN’s Ruel Subdivision when it experienced a train-initiated emergency brake application at Mile 111.7, at Gladwick, near Gogama, Ontario. A subsequent inspection determined that the 7th through 35th cars (29 cars in total) had derailed. Nineteen of the tank cars were breached, and about 1.7 million litres of petroleum crude oil were released to either atmosphere or surface. The released product ignited, and the fires burned for 5 days. About 900 feet of mainline track was destroyed. There was no evacuation, and there were no injuries. 89 At the west end of the derailment site, a broken insulated joint was observed in the south rail, near the signal mast at Mile 111.7. The top of each remaining portion of the joint bars exhibited beach marks, which are indicative of fatigue failure. A 1-inch low spot was previously recorded within the insulated joint, which also contained an REB condition. This indicated that joint support was within limits, but was deteriorating. Because the REB condition and the corresponding low spot did not exceed the limits set out in the TSR or CN Engineering Track Standards (ETS), no action was immediately required to be taken, and there was no urgency to make the repair. Subsequently, the derailment occurred when both insulated joint bars at Mile 111.7 failed beneath the head-end of the train and allowed the trailing L4 wheel of the 8th car to drop into gauge, which spread the rails and caused the trailing cars to derail. With regard to track maintenance and regulatory overview, the investigation determined (in part) that:
- Since the joint bar fatigue cracks extended to the outer surface of each joint bar just
under the rail head, the cracks had likely been visible for some period of time prior to failure, yet were undetected despite numerous inspections by CN.
- The assistant track supervisor lacked sufficient experience to recognize the 1-inch low
spot as being indicative of degrading joint support, the effect of repeated wheel impacts on the degrading joint support, and the need to closely inspect the joint bars for cracks when monitoring the rail end batter condition.
- Training for CN assistant track supervisors (ATSs) related to rail end batter, joint bar
fatigue, bolt hole cracking and joint assembly failure was insufficient to enable the
89 TSB Railway Investigation Report R15H0013.
110| Transportation Safety Board of Canada
ATS to understand the relationship between an unsupported joint and the development of joint defects.
- If risk assessments do not adequately consider increases in traffic tonnage, the use of
heavier rail cars and the potential for more rapidly degrading track structure, regular track maintenance activities may no longer be sufficient to maintain track to the required standards, increasing the risk of track infrastructure failures.
- If TC’s risk-based approach for identifying targeted regulatory track inspections does
not consider all relevant operational factors, such as increases in rail traffic tonnage and the volumes of dangerous goods transported on primary rail corridors, the targeted track inspections may not be well focused, increasing the risk that degrading track conditions will go undetected by the regulator. R15H0020 – CN derailment at Minnipuka, Ontario, 05 March 2015 On 05 March 2015, CN freight train X30131-04 was proceeding eastward on CN’s Ruel Subdivision near Minnipuka, Ontario when a train initiated emergency brake application occurred. Subsequent inspection revealed that 16 Class 111 DG residue tank cars had derailed at Mile 242.29. The derailed equipment included 13 tank cars that last contained petroleum crude oil (UN 1267) and 3 tank cars that last contained gasoline (UN 1203). There were no injuries and no evacuation was required. The temperature at the time of the derailment was -27 °C.90 Although the TSB did not conduct a full investigation into this occurrence, a TSB Engineering Laboratory examination and analysis was conducted and the results are summarized below. On 16 February 2015, a 1.3 mm LSC was marked by Sperry at about 6" west of the point of derailment. A portion of the fractured north rail, which contained a VSH defect, was recovered from the derailment site and forwarded to the TSB Engineering Laboratory for examination. It was determined that: • The 136-pound rail was manufactured by Sydney Steel in 1994. The rail had 5/16 inches of vertical head wear with no appreciable gauge or field-side head wear. All of this was within CN specifications for rail wear. • The hardness of the north rail was within specification. • Exposed rail fractures showed features consistent with fresh overstress rupture. There was no discolouration and there were no other signs of a pre-existing crack or progressive fracture.
90 TSB Laboratory Report LP 84/2015, “Rail Failure Examination” (R15H0020)
Railway Investigation Report R15H0021 | 111
• The north rail failed in the vicinity of an identified localized surface collapse due to the development and propagation of a VSH defect from a pre-existing weakness in the rail due to web streaking (i.e., centreline segregation) (Figure A1). • Macro-etching of a transverse cross- section showed web streaking that exceeded the specified limits. Web streaking (centreline segregation) is a known initiator of VSH defects (Figure A2). • The rail fracture was considered undetectable as it occurred instantaneously under the train with no pre-existing cracking observed. Deterioration of the running surface in the proximity of the thermite weld may have increased dynamic stresses in the area. This increase in stress combined with low ambient temperature and repeated wheel impacts due to the LSC also likely contributed to the rail failure.
Figure A1. Vertical split head defect observed in head and web of rail
Figure A2. Macro-etched cross-section of the north rail with web streaking and vertical split head defect
112| Transportation Safety Board of Canada
Appendix B – National Transportation Safety Board reports involving crude oil trains National Transportation Safety Board railroad accident brief relating to CSX Transportation petroleum crude oil train derailment and hazardous materials release at Lynchburg, Virginia91 On 30 April 2014, eastbound CSX Transportation (CSXT) petroleum crude oil unit train K08227 derailed 17 Class 111 tank cars at Mile 146.45 on main track 2 of the CSXT James River Subdivision in Lynchburg, Virginia, as a result of a defective rail. The train consisted of 2 locomotives, 1 buffer car, and 104 tank cars loaded with petroleum crude oil. It was 6426 feet long and weighed 14 107 tons. Due to track curvature in the area, a permanent maximum authorized speed limit of 25 mph was in place. The train was traveling at 24 mph at the time of the accident. Three of the derailed cars were partially submerged in the James River. One was breached and released about 29 868 gallons of crude oil into the river, some of which caught fire. No injuries to the public or crew were reported. At the time of the accident, it was cloudy and raining lightly. The temperature was 53 °F. National Transportation Safety Board factual report relating to CSX Transportation derailment at Mount Carbon, West Virginia92 On 16 February 2015, eastbound CSXT petroleum crude oil unit train K08014 derailed 27 loaded tank cars in Mount Carbon, West Virginia, as a result of a broken rail. The train consisted of 2 locomotives followed by a buffer car, 107 tank cars, and a tail end buffer car. The train was 6721 feet long and weighed 15 261 tons. The train was transporting about 3.1 million gallons of Bakken petroleum crude oil (UN1267, Class 3, packing group I) from Manitou, North Dakota, and was destined for Yorktown, Virginia. At the time of the accident, CSXT had implemented a temporary 40 mph speed restriction on the territory due to cold weather. The train was proceeding at 33 mph at the time of the accident. The temperature was 15 °F, and there was 8 inches of recent snow. Of the 27 tank cars that derailed, 19 cars were involved in a pileup and a post-derailment pool fire. Two tank cars were punctured during the derailment and released product, and 4 other cars released product from either top or bottom fittings. The pool fire caused thermal tank shell failures on 13 tank cars that had initially survived the accident. A total of approximately 378 000 U.S. gallons (1.43 million litres) of product was released. All tank cars involved in this accident were specification DOT-111A100W1 built to the Association of American Railroads (AAR) CPC-1232 industry standard. At the time of this
91 United States National Transportation Safety Board, Railroad Accident Brief NTSB/RAB/16-01, Accident No. DCA14FR008, CSXT Petroleum Crude Oil Train Derailment and Hazardous Materials Release. 92 National Transportation Safety Board, Tank Car Performance Factual Report (08 July 2015).
Railway Investigation Report R15H0021 | 113
accident, neither the DOT-111 tank cars nor those manufactured to the AAR CPC-1232 standard were required to be equipped with thermal protection systems to protect the tank from exposure to pool or torch fire conditions that can occur in accidents.93 None of the tank cars had thermal protection. During the derailment sequence, 2 tank cars were punctured, and released more than 50 000 gallons of crude oil. Of the 27 tank cars that derailed, 19 cars were involved in a pileup and the post-derailment pool fire. The pool fire caused thermal tank shell failures on 13 tank cars that had initially survived the accident. Only 1 tank car at the edge of the pool fire survived without release. The other 8 derailed tank cars, which were positioned on either side of the pool fire, were not significantly damaged and did not release product. On 12 April 2015, the National Transportation Safety Board issued to the Pipeline and Hazardous Materials Safety Administration 4 urgent safety recommendations that addressed the retrofitting of thermal protection systems for DOT- 111 tank cars used to transport Class 3 flammable liquids. The recommendations included: Require that all new and existing tank cars used to transport all Class 3 flammable liquids be equipped with thermal protection systems that meet or exceed the thermal performance standards outlined in Title 49 Code of Federal Regulations 179.18(a) and are appropriately qualified for the tank car configuration and the commodity transported.94 In conjunction with thermal protection systems called for in safety recommendation R-15-14, require that all new and existing tank cars used to transport all Class 3 flammable liquids be equipped with appropriately sized pressure relief devices that allow the release of pressure under fire conditions to ensure thermal performance that meets or exceeds the requirements of Title 49 Code of Federal Regulations 179.18(a), and that minimizes the likelihood of energetic thermal ruptures. 95 Require an aggressive, intermediate progress milestone schedule, such as a 20 percent yearly completion metric over a 5-year implementation period, for the replacement or retrofitting of legacy DOT-111 and CPC-1232 tank cars to appropriate tank car performance standards, that includes equipping these tank cars with jackets, thermal protection, and appropriately sized pressure relief devices.96 Establish a publically available reporting mechanism that reports at least annually, progress on retrofitting and replacing tank cars subject to thermal
93 Some tank cars may have insulation (typically fiberglass, mineral wool blankets, or foam) applied over the tank and enclosed within a metal jacket. Insulation is used to moderate the temperature of the lading during transportation, but disintegrates at a high temperature. In contrast, a thermal protection system is designed to protect the tank car from the high temperature of a pool fire or torch fire. 94 United States National Transportation Safety Board, Safety Recommendation R-15-014. 95 Ibid., Safety Recommendation R-15-15. 96 Ibid., Safety Recommendation R-15-16.
114| Transportation Safety Board of Canada
protection system performance standards as recommended in safety recommendation R-15-16.97
97 Ibid., Safety Recommendation R-15-17.
Railway Investigation Report R15H0021 | 115
Appendix C – Census metropolitan areas Population of census metropolitan areas (CMA) CMA 2012 2013 2014 2015
persons (thousands) 1 St. John's (NL) 205.9 209.1 212.3 214.3 2 Halifax (NS) 406.7 410 413.6 417.8 3 Moncton (NB) 142.8 144.4 146.1 148 4 Saint John (NB) 128.5 128 127.5 126.9 5 Saguenay (QC) 160 160.3 160.4 160 6 Québec (QC) 785.2 793.6 800.9 806.4 7 Sherbrooke (QC) 207.5 210.1 212.6 214.5 8 Trois-Rivières (QC) 154.4 155.1 156 156.4 9 Montréal (QC) 3,937.40 3,985.10 4,028.00 4,060.70 10 Ottawa-Gatineau (ON/QC) 1,288.50 1,302.90 1,316.50 1,332.00 11 Kingston (ON) 165.9 167.1 168.5 169.9 12 Peterborough (ON) 122.7 123.1 122.8 122.6 13 Oshawa (ON) 373.8 379.1 384 389 14 Toronto (ON) 5,868.70 5,966.40 6,053.40 6,129.90 15 Hamilton (ON) 750.7 758.3 765.2 771.7 16 St. Catharines-Niagara (ON) 404 405.2 406.8 408.2 17 Kitchener-Cambridge-Waterloo (ON) 498.8 503.1 507.3 511.3 18 Brantford (ON) 140.4 141.8 142.8 143.9 19 Guelph (ON) 148 149.5 151.3 153 20 London (ON) 494.4 498.7 502.7 506.4 21 Windsor (ON) 330.8 332.5 334.3 335.8 22 Barrie (ON) 195.4 198 200.3 202.7 23 Greater Sudbury (ON) 165.5 165.7 165.3 164.8 24 Thunder Bay (ON) 125.1 125.2 124.9 124.7 25 Winnipeg (MB) 759.6 770.3 782.6 793.4 26 Regina (SK) 225 231.3 237 241.4 27 Saskatoon (SK) 281.4 291 298.9 305 28 Calgary (AB) 1,307.50 1,357.80 1,406.00 1,439.80 29 Edmonton (AB) 1,241.80 1,286.00 1,331.60 1,363.30 30 Kelowna (BC) 185.6 187.8 191.2 197.3 31 Abbotsford-Mission (BC) 176.7 178.5 181 183.5 32 Vancouver (BC) 2,408.10 2,438.70 2,475.70 2,504.30 33 Victoria (BC) 355.2 357.6 361.4 365.3
Source: Statistics Canada, CANSIM, table 051-0056 (10 February 2016)
116| Transportation Safety Board of Canada
Appendix D – Accident site diagram showing tank cars with shell impact breaches (yellow)
Railway Investigation Report R15H0021 | 117
Appendix E – Accident site diagram showing tank cars with thermal tears (blue)
118| Transportation Safety Board of Canada
Appendix F – Accident site diagram showing tank cars with head impact breaches (red)
Railway Investigation Report R15H0021 | 119
Appendix G – Accident site diagram showing tank cars with breached bottom outlet valves (green)
FD06102 | 2015_加拿大运输安全委员会_CN原油单元列车脱轨五日大火_戈加马_R15H0013_火灾报告(英文).md
分类:06_境外及港澳台调查报告 | 年份:2015 | 地域: | 严重程度: | 场所:交通/车辆 | 起火原因:燃气/爆炸;焊接/动火 | 来源格式:md
1. 报告标题与报告编号
- 标题:Railway Investigation Report R15H0013
- 报告编号:R15H0013
2. 机构与发布日期
- 机构:Transportation Safety Board of Canada(TSB)
- 事故日期:2015 年 2 月 14 日约 2335 EST
3. 事故摘要
- 日期:2015 年 2 月 14 日约 2335 EST
- 地点:Mile 111.7, Ruel Subdivision, Gladwick, near Gogama, Ontario
- 事件:Canadian National 原油单元列车 U70451-10 东行约 38 mph 时触发列车紧急制动。检查发现第 7 至 35 辆车(共 29 辆)脱轨。
- 火灾要点:19 辆罐车破裂,约 170 万升石油原油泄漏并点燃,火灾持续 5 天。约 900 英尺正线轨道损毁。无疏散、无人员受伤。
4. 原因 / 因果因素
- 脱轨与南轨 111.7 英里处断裂的绝缘接头有关;两片接头夹板均断成两截,剩余部分顶部有疲劳断裂海滩纹。
- 2015-01-18 Sperry 钢轨探伤在 111.7 英里处识别 3.5 mm 轨端压溃(REB)。
- REB 发生于钢轨接头,因轨头端错位或缝隙过大,提示接头支撑退化(道砟污脏、枕木劣化或扣件松动)。
- 第 8 辆车(VMSX 311903)导向轮踏面有与暴露轨端接触的撞击痕;从动轮掉入轨距内。
- 轨道维护与检查因素:2014-11-02 几何车在南轨绝缘接头识别 1 英寸表面低洼但未处置(未超紧急/优先标准);3.5 mm REB 未达 CN ETS 监测限;ATS 2015-02-12 目视检查但未测量;2014-12/2015-01 焊接修复未成功(焊工 unavailable、车辆不可用);事发时 CN 未使用机器视觉或超声接头夹板检测技术;低温(−31°C)降低钢轨/接头夹板钢断裂韧性。
- 组织因素:ATS 工作量大(62 英里轨道、每日寒检、多缺陷监测),难以获得天窗,缺乏指导支持;事发接点附近无正式步行接头检查记录。
5. 安全发现
- TSR 对 REB 或 LSC 无指导或 condemning 标准;加拿大将其归为轨面状况而非轨缺陷。
- CN 工程轨道标准 TS 1.7:冬季 REB >3.5 mm 要求每周测两次、48 小时内变化 >4 mm 则 40 mph TSO;但 3.5 mm 条件未触发所需监测。
- CN 未记录天气监测信息;未使用风向监测设备(尽管 DG 协议要求上风接近)。
- CN 事故指挥日志未维护(无记录);签到/签退协议未一致遵守。
- 初期许多员工未戴口罩/呼吸器;未提供半/全脸滤毒罐防重复苯暴露。
- CN 将 2014 年原油运量增视为正常运营参数,未触发风险评估或审查。
- TC 自 2012 年起未对 Ruel 分区检查(事发后 2015-03 检查:67 项不合规条件)。
6. 安全建议 / 纠正行动
- CN 工程通告 2015-E-01(2015-01-15):要求所有压溃头、LSC、REB >3 mm 在 96 小时内测量检查,清单送助理总工;按冬季标准 TS 1.7 补救;慢行令为最后手段。
- CN 轨道标准要求:REB >4 mm 须 48 小时内更换或 40 mph TSO;接头夹板裂纹/断裂须按 TSR Subpart D 更换。
- 建议(CN ETS TS 7.0):对未达法规缺陷的接头状况进行步行随访检查;接头垂直位移 >75% 阈值须整平。
- 可用技术:机器视觉接头夹板检测(检外部裂纹)、超声检测(检顶部内表面缺陷,95% 疲劳裂纹起始处);CN 事发时两者均未使用。
- 应急响应指南(ER Guidebook 128):用水喷雾/雾/泡沫而非直流;初始下风疏散 300 m;消除火源;设备接地;防进入密闭区。
- 现场恢复:CN 向各机构与 Mattagami First Nation 提交计划;森林恢复 2016 春完成;地下水井无限期季度监测。
- TC 监管:基于风险检查;事发后 2015-03 全分区检查识别 67 项不合规条件需修复。
FD06103 | 2015_加拿大运输安全委员会_CN原油单元列车脱轨起火_戈加马_R15H0021_火灾报告(英文).md
分类:06_境外及港澳台调查报告 | 年份:2015 | 地域: | 严重程度: | 场所:交通/车辆 | 起火原因:燃气/爆炸 | 来源格式:md
1. 标题与报告编号
- 标题:Rail transportation safety investigation R15H0021 — Main-track train derailment, CN freight train U70451-02, Mile 88.75 Ruel Subdivision, Gogama, Ontario
- 报告编号:R15H0021
2. 机构与发布日期
- 机构:Transportation Safety Board of Canada(TSB)
- 发布:2017 年 8 月 3 日;事发 2015 年 3 月 7 日
3. 事故摘要
- 日期/地点:2015 年 3 月 7 日 0242 EST;Mile 88.70, Ruel Subdivision, near Gogama, Ontario
- 事件:CN 原油单元列车 U70451-02 东行约 43 mph 触发紧急制动,第 6–44 辆车(共 39 辆)脱轨。约 260 万升石油原油(UN1267)泄漏。起火并爆炸,部分产品进入 Makami River。Makami 河上 CN 桥(Mile 88.70)与约 1000 英尺轨道损毁。无疏散、无伤。
4. 原因 / 发现(关联 R15H0021 findings)
- 列车到达前,南轨轨头一段 16 英寸长母体因 插轨修理东接头竖向裂头(vertical split head)失效 断裂,留缺口致南轨灾难性失效,第 6–44 辆原油罐车脱轨。
- 插轨修理 3 天前切割母轨并目视检裂未发现问题,但雪巡工长未按 CN 工程轨道标准 1.7 对轨端做 染色渗透检测(dye penetrant test)。
- 未对插轨修理轨端不匹配研磨长度给具体指引;60 mm 过渡区无效,突变轨头高度增东端母体动载致失效。
- 大量泄漏产品高挥发低黏度促 撞后大火与池火;缺罐车热防护增严重度(15 辆热撕裂);底出口阀手柄布置不足;43 mph 单元列车速度未降严重度。
5. 安全行动
- TSB 建议 R17-02:TC 获取轨面状况数据(局部表面塌陷、轨端压溃、压溃头),纳入风险规划以定向监管轨道检查。
- 铁路安全建议函 04/15:CN Ruel 分区轨道基础设施状况。
- 2014-10-09 致 TC 与 PHMSA 信:Class 111 罐车更换/改装。
- 铁路安全建议 617-02/20、617-03/20(关联 R20W0025):按列车风险状况改关键列车限速;关键路线增强轨道标准。
FD06104 | 2018_加拿大_TSBC_R18E0138_Rail_Fire_Investigation_2018.pdf
分类:06_境外及港澳台调查报告 | 年份:2018 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R18E0138 | 1
Rail Transportation Safety Investigation Report R18E0138 MAIN-TRACK DERAILMENT Canadian National Railway Company Freight train G83342-24 Mile 24.30, Wainwright Subdivision Landis, Saskatchewan 26 September 2018 The occurrence On 26 September 2018, a Canadian National Railway Company (CN) train crew (the crew) was ordered for 02001 in Saskatoon, Saskatchewan (Figure 1). The crew was scheduled to operate CN freight train G83342-24 (the train) westward on the Wainwright Subdivision from Saskatoon, Mile 191.9 of the Watrous Subdivision, to Edmonton, Alberta, Mile 259.10 of the Wainwright Subdivision. The train departed at about 0430. Figure 1. Occurrence location (Source: Railway Association of Canada, Canadian Railway Atlas, with TSB annotations)
1 All times are Central Standard Time.
2 | TRANSPORTATION SAFETY BOARD OF CANADA The train consisted of 2 head-end locomotives, 2 mid-train remote-controlled locomotives, 179 covered hopper cars loaded with canola seeds, and 3 cars loaded with lumber products. The train weighed about 24 250 tons and was about 10 800 feet long. At about 0915, while operating at 51 mph through Landis, Saskatchewan, the train experienced an undesired emergency brake application. After coming to a stop and upon inspection, the crew determined that the 2 mid-train remote-controlled locomotives, in positions 79 and 80,2 and 41 covered hopper cars loaded with canola seeds, in positions 52 to 92, had derailed in various orientations along the right-of-way (Figure 2). The point of derailment was determined to be Mile 24.30 of the Wainwright Subdivision. Figure 2. Derailment site, looking south (Source: TSB) Crew information The crew consisted of a locomotive engineer and a conductor. Both crew members were qualified for their respective positions, met established fitness and rest requirements, and were familiar with the territory. Subdivision and track information The Wainwright Subdivision runs east–west between Mile 0.0 at Biggar, Saskatchewan, and Mile 264.7 at Edmonton, Alberta. Train movements are controlled by the centralized traffic control system (CTC), as authorized by the Canadian Rail Operating Rules (CROR), and supervised by a rail traffic controller
2 The positions of the derailed locomotives and cars are numbered from immediately behind the lead locomotives.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R18E0138 | 3
(RTC) located in Edmonton. Train traffic through this corridor is about 42 trains per day, with an annual tonnage of approximately 5.5 million gross tons (MGT). In the vicinity of the derailment, the track is Class 4 track according to the Transport Canada– approved Rules Respecting Track Safety, also known as the Track Safety Rules (TSR). The maximum authorized speed for freight trains was 55 mph. The track consisted of 136-pound Nippon rail manufactured and installed in 2013, No. 1 hardwood ties in good condition and fully spiked tie plates. The rail, which was within established wear limits, was box-anchored. The ballast was crushed rock in good condition. The subgrade and drainage was excellent in the vicinity of the occurrence. Track inspection and maintenance The TSR outline the minimum track maintenance standards and related track inspection requirements. In addition to the TSR, CN had developed its Engineering Track Standards, providing further guidance that meets or exceeds the TSR requirements. In the derailment area, the track had been inspected on 20 and 24 September 2018, with no defects detected. The two No. 12 turnouts located at each end of the industrial spur at Landis had been inspected on 19 September 2018, with no defects detected. Forward-facing camera The lead locomotive was equipped with a forward-facing camera. Based on a review of the video recording, no track anomalies were visible when the lead locomotive passed over the occurrence site. Site examination During site examination, it was noted that covered hopper car CEFX 350816 was the first car to derail. It remained upright with the A-end on the rail and the B-end derailed; its number 1 axle and wheels were missing (Figure 3). A broken axle from car CEFX 350816 (Figure 4) was discovered to the north of the track, about 300 feet from the east switch for the Landis Producer Co-op track. The other half of the axle/wheel set was not recovered.
Figure 3. Car CEFX 350816 with number 1 axle and wheels missing (Source: CN)
4 | TRANSPORTATION SAFETY BOARD OF CANADA Starting about 20 feet west of the east switch for the Landis Producer Co-op track, there were fresh abrasion marks on the ties between the rails, suggesting that the axle broke at this location. Following the broken axle and derailment of this wheel set, the trailing truck on car CEFX 350816 was dragged for approximately 4000 feet to where the main derailment pile-up was located (Figure 5). Figure 5. Point of derailment and main derailment pile-up (Source: Google Earth, with TSB annotations) Wheel shop practice and regulatory requirements The Transport Canada–approved Railway Freight Car Inspection and Safety Rules set out the minimum safety standards for freight cars. Section 10, Axles, of the rules states that “a railway company shall not place or continue a car in service” if “an axle has a crack or is bent or broken.” Rail cars regularly receive the required certified car inspections (CCI). However, such visual inspections may not identify a cracked or damaged axle, depending on the size and location of the defect. Figure 4. Broken axle with wheel from car CEFX 350816 (Source: TSB)
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R18E0138 | 5
Additionally, current wayside detectors are not necessarily designed to identify a rail car with a cracked axle. As such, cracked axles are often difficult to detect. Wheel shop practice is governed by the Association of American Railroads (AAR) Manual of Standards and Recommended Practices, Section G, Part II – Wheel and Axle Manual (G-II Manual). Rule 1.1 of the G-II Manual indicates (in part): Rule 1.1 Axles—General Practices […] 1.1.9 Machined and secondhand wheel seats and journal fillet areas […] of unmounted secondhand axles in freight car service and the entire length of unmounted secondhand axles in other services must be magnetic particle tested by the fluorescent (black light) wet method before remounting[….] Axles that do not require the wheels to be unmounted must be magnetic particle-tested by the wet method before mounting roller bearings. As a minimum, the journal fillet area bounded by the “A” dimension shown in RP-633, Fig. 4.4, must be tested all the way around[….]3 When a wheel set is returned to a wheel shop for reconditioning, if not enough tread material remains for reprofiling,4 the wheels are pressed off the axle and the axle is inspected. If the axle meets reconditioning criteria, it qualifies as a secondhand unmounted axle. New wheels and new or reconditioned roller bearings can be applied to the axle, and the wheel set assembly can then be returned to service. Using this process, some axles can remain in service for over 40 years and can have a number of wheels applied during that time. The broken axle The broken axle was a 6 ½-inch by 12-inch Grade F axle, manufactured in February 1999 by MRF- Standard Forged products in McKees Rocks, Pennsylvania, United States.5 At the time of the occurrence, the wheels on the axle were 36-inch, Grade C, heat-treated, curved-plate wheels manufactured in December 2015 by Griffin Wheel in Kansas City, Missouri, United States. Before the wheels and bearings were applied, the axle had been inspected on 12 January 2016 as per AAR requirements and qualified as a secondhand unmounted axle. The 6 ½-inch by 12-inch Timken bearings had been reconditioned on 04 January 2016. The wheels and bearings were mounted on the axle on 13 January 2016 at Greenbrier Rail Services in Tacoma, Washington, United States. The car was repaired on 15 January 2016 in Vancouver, BC, at which time the number 1 wheelset was applied to the car. Metallurgical analysis of the broken axle determined the following: • The tensile properties and chemical analysis showed that the axle conformed to the requirements of AAR specification M-101 (AAR M-101) for Grade F (normalized and double tempered) steel axle. There was no indication of pre-existing steel defects, such as excessive
3 Association of American Railroads, Manual of Standards and Recommended Practices, Section G, Part II – Wheel and Axle Manual, Rule 1.1 - Axles—General Practices, implemented March 2018. 4 A wheel set on which the wheels remain mounted to the axle while the wheel treads are machined or turned to restore the original profile is considered a “reprofiled wheel set.” 5 There was no information available to confirm when the subject axle entered service.
6 | TRANSPORTATION SAFETY BOARD OF CANADA non-metallic inclusions, or any other detrimental material conditions that could have contributed to the failure. • It is likely that the axle failure was due to high cyclic fatigue6 that had initiated at 2 adjacent sites on the axle surface from rotational bending. • Initiation of the failure was likely due to contact as indicated by the contact/galling damage noted on the outside surface of the axle. • Post-fracture contact damage and corrosion had obscured the primary and secondary fatigue-initiation sites on the outside surface of the axle. Therefore, the original axle surface features, prior to failure, could not be assessed. • Corroded fatigue striations were present near the secondary fatigue-initiation site, confirming high cyclic fatigue as indicated by macroscopic “beach marks” and a single Smekal (fracture) lance7 (Figure 6). • The fatigue crack propagated across about 80% of the axle cross-section until the remaining intact metal ligament could no longer support the operating stresses, resulting in the final catastrophic axle failure. Figure 6. Broken axle from car CEFX 350816 (Source: SGS MSi Testing & Engineering Inc.) Indexer strike Metallurgical analysis of the axle indicated that the failure mechanism was likely initiated by surface damage sustained by the reconditioned axle. CN determined that this damage may have been caused by a defective indexer8 at a customer loading facility.
6 Cyclic fatigue is defined as the weakening of a material caused by repeatedly applied loads. Progressive and localized structural damage occurs when a material is subjected to cyclic loading. 7 Fracture lances are produced by the superposition of tensile and anti-plane shear loading and are formed as a result of piecewise adjustment of the crack plane to changes in the directions of the maximum principal stress at the crack tip in a plane perpendicular to the direction of crack propagation. (Source: Engineering Fracture Mechanics, Volume 1, Issue 3, April 1969, pp. 539-540, IN11-IN14, and 541-546.) 8 An indexer is a mechanical system used to move rail cars at a loading/unloading facility. There are various indexer designs, including the axle type car mover based on an assembly that pushes against the axle of a rail car to provide propulsion.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R18E0138 | 7
Safety message Although rail cars regularly receive the required certified car inspections (CCI), a cracked or damaged axle may not be identified through such visual inspections, depending on the size and location of the defect. Furthermore, cracked axles are often difficult to identify because current wayside detectors are not necessarily designed to identify a rail car with a cracked axle. Safety action taken CN is currently implementing and issuing guidance to its customer facilities for the inspection and maintenance of indexers to prevent axle damage. This report concludes the Transportation Safety Board of Canada’s investigation into this occurrence. The Board authorized the release of this report on 19 June 2019. It was officially released on 09 July 2019. Visit the Transportation Safety Board of Canada’s website (www.tsb.gc.ca) for information about the TSB and its products and services. You will also find the Watchlist, which identifies the key safety issues that need to be addressed to make Canada’s transportation system even safer. In each case, the TSB has found that actions taken to date are inadequate, and that industry and regulators need to take additional concrete measures to eliminate the risks.
8 | TRANSPORTATION SAFETY BOARD OF CANADA ABOUT THIS INVESTIGATION REPORT This report is the result of an investigation into a class 4 occurrence. For more information, see the Policy on Occurrence Classification at www.tsb.gc.ca The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. TERMS OF USE Non-commercial reproduction Unless otherwise specified, you may reproduce this investigation report in whole or in part for non-commercial purposes, and in any format, without charge or further permission, provided you do the following: • Exercise due diligence in ensuring the accuracy of the materials reproduced. • Indicate the complete title of the materials reproduced and name the Transportation Safety Board of Canada as the author. • Indicate that the reproduction is a copy of the version available at [URL where original document is available]. Commercial reproduction Unless otherwise specified, you may not reproduce this investigation report, in whole or in part, for the purposes of commercial redistribution without prior written permission from the TSB. Materials under the copyright of another party Some of the content in this investigation report (notably images on which a source other than the TSB is named) is subject to the copyright of another party and is protected under the Copyright Act and international agreements. For information concerning copyright ownership and restrictions, please contact the TSB. Citation Transportation Safety Board of Canada, Rail Transportation Safety Investigation Report R18E0138 (released 09 July 2019). Transportation Safety Board of Canada Place du Centre 200 Promenade du Portage, 4th floor Gatineau QC K1A 1K8 819-994-3741 1-800-387-3557 www.tsb.gc.ca communications@tsb.gc.ca © Her Majesty the Queen in Right of Canada, as represented by the Transportation Safety Board of Canada, 2019 Rail transportation safety investigation report R18E0138 Cat. No. TU3-11/18-0138E-PDF ISBN: 978-0-660-31743-4 This report is available on the website of the Transportation Safety Board of Canada at www.tsb.gc.ca Le présent rapport est également disponible en français.
FD06105 | 2018_加拿大_TSBC_R18T0006_Rail_Fire_Investigation_2018.pdf
分类:06_境外及港澳台调查报告 | 年份:2018 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R18T0006 CROSSING COLLISION Canadian National Railway Company Freight train Q14891-08 Mile 77.66, Dundas Subdivision London, Ontario 09 January 2018
II | TRANSPORTATION SAFETY BOARD OF CANADA ABOUT THIS INVESTIGATION REPORT This report is the result of an investigation into a class 3 occurrence. For more information, see the Policy on Occurrence Classification at www.tsb.gc.ca The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. TERMS OF USE Non-commercial reproduction Unless otherwise specified, you may reproduce this investigation report in whole or in part for non-commercial purposes, and in any format, without charge or further permission, provided you do the following: • Exercise due diligence in ensuring the accuracy of the materials reproduced. • Indicate the complete title of the materials reproduced and name the Transportation Safety Board of Canada as the author. • Indicate that the reproduction is a copy of the version available at [URL where original document is available]. Commercial reproduction Unless otherwise specified, you may not reproduce this investigation report, in whole or in part, for the purposes of commercial redistribution without prior written permission from the TSB. Materials under the copyright of another party Some of the content in this investigation report (notably images on which a source other than the TSB is named) is subject to the copyright of another party and is protected under the Copyright Act and international agreements. For information concerning copyright ownership and restrictions, please contact the TSB. Citation Transportation Safety Board of Canada, Rail Transportation Safety Investigation Report R18T0006 (released 17 July 2019).
Transportation Safety Board of Canada Place du Centre 200 Promenade du Portage, 4th floor Gatineau QC K1A 1K8 819-994-3741 1-800-387-3557 www.tsb.gc.ca communications@tsb.gc.ca © Her Majesty the Queen in Right of Canada, as represented by the Transportation Safety Board of Canada, 2019 Rail transportation safety investigation report R18T0006 Cat. No. TU3-11/18-0006E-PDF ISBN: 978-0-660-31534-8 This report is available on the website of the Transportation Safety Board of Canada at www.tsb.gc.ca Le présent rapport est également disponible en français.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R18T0006 | III Table of contents 1.0 Factual information ................................................................................................. 1 1.1 The accident ................................................................................................................................................. 1 1.2 Site examination ......................................................................................................................................... 2 1.3 Weather .......................................................................................................................................................... 3 1.4 Recorded information............................................................................................................................... 3 1.4.1 Locomotive event recorder .................................................................................................... 3 1.4.2 Signal bungalow download ................................................................................................... 3 1.4.3 Security camera recording ...................................................................................................... 3 1.4.4 Cellphone analysis ..................................................................................................................... 5 1.5 Subdivision information ........................................................................................................................... 5 1.6 Crossing information ................................................................................................................................ 6 1.7 Regulatory inspection and assessment ............................................................................................. 8 1.8 Risk ranking of crossings ......................................................................................................................... 9 1.9 Responsibility for snow clearing at crossings ................................................................................. 9 1.10 Snow-clearing operations for the City of London ......................................................................... 9 1.11 Jackson Pools Inc. and Wee Bee Contracting ...............................................................................11 1.12 Training for snowplow operators .......................................................................................................12 1.13 The snowplow operator .........................................................................................................................14 1.14 Ontario Occupational Health and Safety Act .................................................................................15 1.15 Audio analysis during re-enactment at the crossing .................................................................17 1.16 Sightline from within the snowplow cab .........................................................................................18 1.17 Hazard detection and information processing by humans .....................................................20 1.18 Vehicle operator attention ....................................................................................................................21 1.19 Expectations and knowledge ...............................................................................................................22 1.20 Fatigue .........................................................................................................................................................22 1.21 Effects of tetrahydrocannabinol on human cognitive functions ...........................................23 1.22 Other crossing accidents involving snow-clearing equipment ..............................................25 1.23 TSB laboratory reports ...........................................................................................................................26 2.0 Analysis ................................................................................................................... 27 2.1 The accident ...............................................................................................................................................27 2.2 Visual scanning at the crossing ..........................................................................................................28 2.3 Fatigue ..........................................................................................................................................................28 2.4 Tetrahydrocannabinol.............................................................................................................................29 2.5 Training .........................................................................................................................................................29 2.6 Oversight of contractors ........................................................................................................................29 2.7 Safe work procedures at crossings during snow-clearing operations ................................30 3.0 Findings ................................................................................................................... 31 3.1 Findings as to causes and contributing factors ............................................................................31 3.2 Findings as to risk .....................................................................................................................................32 3.3 Other findings ............................................................................................................................................32
IV | TRANSPORTATION SAFETY BOARD OF CANADA 4.0 Safety action ........................................................................................................... 33 4.1 Safety action taken ..................................................................................................................................33 4.1.1 City of London ...........................................................................................................................33
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R18T0006 | 1 RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R18T0006 CROSSING COLLISION Canadian National Railway Company Freight train Q14891-08 Mile 77.66, Dundas Subdivision London, Ontario 09 January 2018 The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. Summary On 09 January 2018, at about 0940 Eastern Standard Time, Canadian National Railway Company freight train Q14891-08, proceeding eastward on the Dundas Subdivision, struck a snowplow on the sidewalk at the Colborne Street public crossing at Mile 77.66 in London, Ontario. The crossing was equipped with flashing light signals, a bell, and gates. The lone occupant of the snowplow was fatally injured. 1.0 FACTUAL INFORMATION 1.1 The accident On 08 January 2018, at about 1900,1 Canadian National Railway Company (CN) freight train Q14891-08 (the train) departed Chicago, Illinois, U.S., destined for Montréal, Quebec (Figure 1). The train entered Canada at Sarnia, Ontario (Mile 57.2 of the Strathroy Subdivision), and travelled eastward to London, Ontario, where the Strathroy Subdivision joins the Dundas Subdivision. The train continued eastward on the south main track of the Dundas Subdivision. The train comprised 2 head-end locomotives and 30 cars totalling 80 platforms. The train weighed approximately 4645 tons and was about 5015 feet in length. The lead locomotive (CN 5605) was a General Motors SD70i model locomotive with a 3-flute horn installed. The trailing locomotive (CREX 1520) was a General Electric ES44AC model locomotive. The train
1 All times are Eastern Standard Time.
2 | TRANSPORTATION SAFETY BOARD OF CANADA crew, consisting of a locomotive engineer and a conductor, were familiar with the territory and met fitness and rest standards. Figure 1. Occurrence location (Source: Railway Association of Canada, Canadian Rail Atlas, with TSB annotations)
On 09 January 2018, at about 0940, as the train approached the Colborne Street public crossing (Mile 77.66) in London, the train crew observed a snowplow travelling slowly northward toward the crossing while clearing snow from the sidewalk. Travelling onto the crossing, the snowplow continued to clear snow. The locomotive engineer sounded the locomotive whistle to alert the snowplow operator to the oncoming train. When it became apparent that the snowplow would not be clear of the crossing before the train reached it, the locomotive engineer initiated an emergency brake application. However, the train was not able to stop before the crossing and struck the snowplow. In the seconds leading up to impact, the snowplow operator did not look toward the train. As a result of the collision, the lone occupant of the snowplow was fatally injured. The snowplow was destroyed. The train and the track were not damaged. 1.2 Site examination The head end of the train came to rest about 2200 feet east of the crossing. The snowplow came to rest about 250 feet east of the crossing on the south side of the south main track. The snowplow operator was thrown from the snowplow. The blower from the snowplow came to rest north of the south main track. There was a cellphone in the snowplow operator’s shirt pocket, with earphones attached. One earphone speaker was in the operator’s ear. The phone appeared to be undamaged. No
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R18T0006 | 3 music-playing application was open, and no music was heard coming from the earphones. The cell phone and earphones were sent to the Transportation Safety Board of Canada (TSB) laboratory for further examination. 1.3 Weather As reported by the Government of Canada weather station in London, the temperature at the time of the occurrence was −4 °C, with the wind blowing at about 12 km/h from the west. Visibility was approximately 9 km. In the 2 days preceding the occurrence, snow had been falling, beginning at 1500 on 07 January 2018 and continuing until 1200 on 08 January 2018. About 11 cm of snow had accumulated on the ground. 1.4 Recorded information 1.4.1 Locomotive event recorder The locomotive event recorder download was examined. It was determined that • while approaching the crossing, the train was travelling at about 44 mph with the train brakes released and the throttle in idle; • the train horn was sounded almost continuously for 19 seconds leading up to the crossing; and • the train brakes were applied in emergency before the train reached the crossing. 1.4.2 Signal bungalow download The download from the signal bungalow was examined. It was determined that • the bell and lights began to operate about 29 seconds before the train occupied the crossing; • the gates began to descend 4 seconds later, and it took 13 seconds for all 3 gates to descend fully; and • the train occupied the crossing about 12 seconds later. 1.4.3 Security camera recording A security camera recording was retrieved from a nearby office building and sent to the TSB Engineering Laboratory for examination. The following was determined: • The snowplow approached the Colborne Street public crossing on the east sidewalk from the south while clearing snow with the blower (Figure 2). • The snowplow approached the crossing while travelling at a speed that varied between 2.6 km/h and 7.3 km/h. • The snowplow was adjacent to the crossing warning system mast and gate when the lights on the grade crossing warning devices (GCWDs) began to operate. • The snowplow was about 4.6 m beyond the crossing mast when the gates began to descend.
4 | TRANSPORTATION SAFETY BOARD OF CANADA • The snowplow continued onto the crossing while travelling at about 1.4 km/h and continued to blow snow. Figure 2. Movement of the snowplow as it approached the Colborne Street public crossing (Source: Google Earth, with TSB annotations)
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R18T0006 | 5 Position marked on Figure 1 Video time Activity Train’s approximate speed between positions (km/h [mph]) Snowplow blowing snow 1 0938:06 Snowplow proceeding north along Colborne Street 6.0 (3.7) Yes 2 0938:09 Snowplow stops. Snowplow starts at 0938:20 6.8 (4.2) Yes 3 0938:21 Snowplow stops. Snowplow starts at 0938:24 7.3 (4.5) Yes 4 0938:29 Snowplow stops and reverses 3.6 (2.2) No 5 0938:41 Snowplow stops reversing. Snowplow starts forward at 0938:42 2.9 (1.8) Yes 6 0939:02 Snowplow stops and reverses slightly. Snowplow starts forward at 0939:05 2.6 (1.6) Yes 7 0939:34 Lights on raised warning gate begin to flash 4.1 (2.5) Yes 8 0939:38 Gates begin to descend 1.4 (0.9) Yes 9 0939:49 0930:49– 0939:56 Gates are fully lowered Snowplow changes throw angle of blower 1.0 (0.6) Yes, with adjustments 10 0940:05 Train collides with snowplow 1.4.4 Cellphone analysis The cellphone and earphones recovered from the accident site were examined. The cellphone battery was discharged when it was received at the TSB Engineering Laboratory but the phone was undamaged. One of the earphone speakers was detached from the wire and was missing. It could not be determined whether the phone had been playing music at the time of the occurrence. The media-playing volume was set at one sixteenth of the total volume. The text message audio alert level was set to nine sixteenths of the total volume. No phone calls or text messages had been received or transmitted during the time leading up to the occurrence. 1.5 Subdivision information The Dundas Subdivision consists of double main tracks, extending from Mile 0.0 (Bayview Station near Burlington, Ontario) to Mile 78.2 (London). The track is classified as Class 4 track according to the Transport Canada–approved Rules Respecting Track Safety. Train movements on this subdivision are governed by the centralized traffic control method of train control, as authorized by the Canadian Rail Operating Rules (CROR), and supervised by
6 | TRANSPORTATION SAFETY BOARD OF CANADA a rail traffic controller located in Toronto, Ontario. Train traffic consists of about 28 trains per day. In the vicinity of the crossing, the Dundas Subdivision is oriented in an east–west direction. The timetable speed is 60 mph for freight trains and 70 mph for passenger trains. Between Mile 77.5 and Mile 78.2, there is a permanent slow order of 50 mph for freight trains and passenger trains. 1.6 Crossing information At the Colborne Street public crossing, road traffic on both the north approach and the south approach is protected with flashing light signals (some on cantilevered structures), a bell, standard reflectorized crossing signs, and gates (Figure 3). The gate at the north approach is installed at the roadside and extends across 2 lanes of traffic. The south approach has 2 gates, with 1 gate installed on the boulevard in the middle of the roadway extending across 1 lane of traffic, and 1 gate installed at the roadside extending across the other lane of traffic. In all 4 quadrants, there is a sidewalk approach to the crossing. There are no gates to specifically protect pedestrians at this crossing. The crossing surfaces between the sidewalks are paved with asphalt extending at least to the outside edge of the sidewalks, and are in compliance with Part B of the Transport Canada (TC) Grade Crossings Standards.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R18T0006 | 7 Figure 3. Colborne Street public crossing, looking north (Source: TSB)
Each crossing approach is equipped with 10 light signals. There are 6 front lights facing the traffic for the lane being protected: 4 front lights on the cantilever structure and 2 front lights on the warning system mast. There are 4 back lights facing the oncoming traffic in the opposing lane: 2 back lights on the cantilever and 2 back lights on the mast. Each light is equipped with light-emitting diodes. The alignment of the lights is tested monthly. Following the occurrence, the light alignment was tested. No adjustments were required. At the crossing, there are 4 sets of railway tracks. There is a sign on each crossing mast informing vehicle drivers of the number of tracks. The southern-most track was not in use, as the rail on each side of the roadway had been removed. The next 2 tracks are the south main track and the north main track of the Dundas Subdivision. The most northerly track is a yard track. The crossing was designated as an anti-whistling crossing.2 The clearance distance3 for the crossing was 85 feet. The amount of warning time provided by the GCWDs was designed in
2 At anti-whistling crossings, railway movements are not required to sound their horns in advance of the crossing, per Rule 14(l) of the Canadian Rail Operating Rules. 3 The clearance distance is the distance that the crossing design vehicle travels to go from a position 2 m in front of the gate to clearing the last rail by 2.4 m.
8 | TRANSPORTATION SAFETY BOARD OF CANADA accordance with subsection 12(1) of the Highway Crossings Protective Devices Regulations, which were in force at the time of installation in 1997. Signals were required to be active 25 seconds prior to a train entering the crossing. This time included the distance that the designated design vehicle must travel to be clear of the 4 sets of tracks. These regulations were repealed when the new Grade Crossings Regulations and Grade Crossings Standards came into effect in 2014. The new regulations and standards refer to Part 3 of the 20134 AREMA (American Railway Engineering and Maintenance-of-Way Association) Communications and Signals Manual of Recommended Practices when determining signal warning times at crossings. Part 3.3.10, which provides instructions on determining warning times, indicates that the total warning time is the sum of the minimum time (20 seconds), the greater of the clearance time5 and the exit gate clearance time,6 and the buffer time.7 In this occurrence, with the snowplow travelling at about 1.5 km/h, it would have taken about 62 seconds to travel over the 85-foot clearance distance. 1.7 Regulatory inspection and assessment Following the occurrence, TC inspected the crossing and noted no regulatory infractions. TC identified the following concerns: • the crossing design plan conditions;8 • the distance from the south crossing warning system mast to the southern-most operational track; • the audibility of the bell by pedestrians; and • the visibility of the warning signals once a pedestrian is past the visible cone of the existing front warning lights. TC also identified a concern when work such as snow removal on the crossing was being conducted without procedures or practices in place to ensure adequate situational knowledge to work safely. In February 2018, TC issued a Letter of Concern to the City of London (the City) on this issue.
4 The Grade Crossings Standards were amended on 01 January 2019 to reference the 2014 edition of the AREMA Communications and Signals Manual of Recommended Practices. The amendment came into force on 01 March 2019. 5 The clearance time is determined by adding 1 second for every 10 feet that the minimum track clearance distance exceeds 35 feet. 6 For 4-quadrant gate systems, the exit gate clearance time is the amount of time provided to delay the descent of the exit gate arm(s) after the entrance gate arm(s) begin to descend and is determined in accordance with the U.S. Department of Transportation Federal Highway Administration’s Manual on Uniform Traffic Control Devices. 7 The buffer time is discretionary and may be provided to accommodate minor variations in train handling. 8 The plans are not dated or signed to indicate when changes were made. The data recorder label for the recording of the “Gate Control” output is listed as “TEST SWITC” in the event recorder logs.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R18T0006 | 9 1.8 Risk ranking of crossings Each year, TC ranks all provincially and federally regulated grade crossings based on their level of risk. The risk is determined based on a number of factors, including • number of rail occurrences at the crossing; • volume of road and railway traffic; • maximum train and vehicle speeds; • number of tracks and lanes; • urban or rural environment; and • warning systems in place at the crossing (such as gates, bells, lights). The risk-ranking methodology does not consider sightline visibility, crossing gradient, crossing angle, or proximity to nearby intersections. According to the risk ranking compiled in April 2017, out of 23 464 crossings in Canada, the Colborne Street public crossing had the 312th-highest level of risk. On the Dundas Subdivision, 3 other crossings in the vicinity of the Colborne Street public crossing had higher risk rankings. In the 2018 risk rankings, the Colborne Street public crossing’s assessment of risk included this occurrence. Based on the updated risk assessment, the crossing had the 36th-highest level of risk. 1.9 Responsibility for snow clearing at crossings The physical maintenance of a crossing is a shared responsibility between the railway and the road authority. Each year, CN issues letters to road authorities that provide guidance on performing snow-clearing operations in the vicinity of a crossing, and had issued a letter to the City before the 2017–2018 winter season. 1.10 Snow-clearing operations for the City of London To keep the road and sidewalk surfaces clear of snow and ice, the City employed a team of maintenance personnel, who were trained and qualified to perform their assigned duties. The City had also arranged contracts with private snow-clearing companies to supplement its core snow-clearing services. When snow clearing was required, the City employees were the first to be dispatched to begin clearing the main roads and sidewalks. If needed, the contractor companies were then called to help clear the secondary roads and sidewalks. If the snowfall was heavy, the contractors could be called in sooner.
10 | TRANSPORTATION SAFETY BOARD OF CANADA To manage the snow-clearing effort, the City was divided into 4 districts. Each district was subdivided into beats.9 District supervisors had a team of City employees and a list of contractor companies dedicated to clearing snow from the beats in their district. The contractors were typically assigned to specific beats. In 2015, the City initiated a contract-tendering process for snow-clearing companies with the mandate to help perform the work of plowing/sanding on sidewalks and at bus stops.10 The period of the contract was 6 years. The tender contained the specific terms and conditions for the potential bidders, including the following: General Conditions, Instructions & Information for Bidders […]
- Sub-Contracts
The Successful Bidder shall not, without the written consent of the City, make any assignment or sub-contract for the provision of any goods or services hereby bid on. […] 3-0 Requirements at Time of Execution […] 3-4 Safety Policies and Procedures and Related Documentation […] a) Their written health and safety policy and program where required under Section 25 (2) (j) of the Occupational Health and Safety Act. […] 5-0 Terms & Conditions […] 5-9 Equipment Operators […] d) The successful bidder will provide a copy of their snow plow training documents, along with a list of trained operators. […] 5-15 Successful Bidder’s Responsibilities […] d) The successful bidder must ensure all equipment operators have at a minimum an Ontario Class “G” drivers license and provide a copy upon request by the City.11
9 A beat is a geographical grouping of roads. Each beat represents the approximate amount of work that a single snow-clearing operator can complete in one 12-hour shift. 10 The Corporation of the City of London, Purchasing and Supply, Specification Number 975-66-04 (05 May 2015). 11 The Corporation of the City of London, Tender 15-19: Winter Maintenance Equipment with Operators – Sidewalk Snow Plows/Sander Unit.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R18T0006 | 11 In conjunction with Tender 15-19, the City issued a Purchasing and Specification document that identified additional requirements for the successful bidder, including the following: 2.0 Equipment Operators a) The successful bidder’s operator shall be qualified to drive the sidewalk snow plow/sander unit being supplied by the successful bidder. […] 7.0 Conditions of Employment a) All operators must be in possession of a valid driver’s license. b) The successful bidder will provide the Manager of Operations – Roadsides with the following on or before November 15th, of each year (on forms supplied by the City):
A written list stating the operators(s) proper names and telephone numbers. Additional operators MAY NOT BE USED without the approval of the Managing Director of Environmental & Engineering Services & Engineering Services & City Engineer/designate. […] 8.0 Hours of Work Restrictions […] c) The successful bidder […] will […] be responsible for training of his operators.12 1.11 Jackson Pools Inc. and Wee Bee Contracting Jackson Pools Inc. (Jackson Pools) operated a pool installation and maintenance service business in the summer and a snow-clearing service in the winter. In the winter, Jackson Pools had 5 part-time employees, including 3 employees for clearing snow. Jackson Pools owned 3 Bobcat skid-steer loaders, 2 of which were outfitted with attachments for snow clearing. In 2015, Jackson Pools participated in the City’s tendering process for a contract to clear snow from sidewalks. Jackson Pools was successful and was awarded a 6-year contract to supply 3 snowplows and operators to clear snow from sidewalks in 3 beats. Only 1 of its snowplows was allocated to the City’s contract. The other 2 snowplows allocated to the contract were supplied by Wee Bee Contracting (Wee Bee), along with the operators, through a verbal agreement with Jackson Pools. Wee Bee operated flea markets in the summer and provided snow-clearing services in the winter. The company owned 2 Bobcat S130 skid-steer loaders,13 both outfitted for snow- clearing operations (Figure 4). Each of these snowplows was equipped with either a blade or a blower, a cab, and meshing on the side windows. To fulfill its obligation to Jackson Pools, Wee Bee employed 4 snowplow operators.
12 The Corporation of the City of London, Purchasing and Supply, Specification Number 975-66-04 (05 May 2015). 13 The Ministry of Transportation of Ontario stated in correspondence with the TSB that the occurrence snowplow is considered a “road building machine,” and as such does not require a licence to operate.
12 | TRANSPORTATION SAFETY BOARD OF CANADA Figure 4. Bobcat S130 skid-steer loader equipped with a blower (Source: TSB)
When the City required Jackson Pools’ snow-clearing services, it called Jackson Pools, which would in turn contact Wee Bee. Although the City would at times communicate with Wee Bee directly, it was unaware that Wee Bee employees were not Jackson Pools employees. A list of qualified Wee Bee or Jackson Pools employees, including proof of their valid driver’s licences, had not been provided to the City. 1.12 Training for snowplow operators All new City employees undergo a 3-day classroom corporate orientation program along with any practical driver training required for their position. The corporate orientation program covered general orientation training, health and safety training, and a driver development program. The driver development program consisted of classroom training and practical driver training to ensure that all drivers of City vehicles, including sidewalk snowplows, had the proper licences and were adequately trained for the work. Employees’ attendance at these courses was tracked and monitored. Refresher training and recertification programs were offered to employees as needed. The practical driver training consisted of up to 40 hours of in-seat time to master the operation of up to 9 different machines. Snowplow operators were typically drawn from a pool of experienced full-time City employees. These employees often did not require additional practical driver training. To ensure that the training program was complete, the City also conducted risk assessments on individual tasks, including sidewalk plowing and sanding.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R18T0006 | 13 The driver development program came with a manual. The manual addressed railway crossings, stating that
- 2 All railroad crossings must always be treated with extreme caution. Driver
should follow this procedure: a) Slow to a speed that, in the event a train is approaching or the crossing signal is activated, will allow the vehicle or equipment to be safely brought to a stop no closer than 5 meters (15 feet) from the nearest track; and b) The driver shall check in both directions while approaching the track(s).14 The driver development program also covered a document entitled Employee Rules and Regulations. Section 8 of that document addressed the driver’s conduct at a railway crossing: A very hazardous situation can occur if snow or ice is deposited on a railway track or against railway gate-arms resulting in the gates not being able to drop. City snow plows and graders must not plow across railway tracks.15 The driver development program also covered “Tips for Snow Plow Operators,” developed by Operation Lifesaver.16 This document provided guidance on the use of flag persons at crossings; how to deal with emergency situations; the use of snow, salt, and chemicals at crossings; and how to approach crossings. The document also provided strategies to operators of roadway snow-clearing vehicles relating to crossing the tracks safely, including
these:
Ensure it is safe to cross the tracks by looking both ways. Open windows/doors
and turn off radios or fans so as to see and hear better […];
Raise the plow blade and wing or other attachments high enough to clear the
tracks and signals;
To avoid stalling, use a gear which will let you cross the tracks without shifting;
[…]
After you have started over the tracks, if the crossing lights begin to flash KEEP GOING. It is safer to continue forward than to reverse.17 Sidewalk snowplow operators who were City employees were taught to lift their blades or blowers to the top notch (more than 12 inches above the roadway when crossing railway tracks). In 2015, when the snow-clearing contracts were awarded, the City met with all the contractors to discuss the City’s performance expectations and the administration of the contract. After the contracts began, meetings between the City and the contractors were ad hoc. No safety meetings were held to discuss safe operating practices specifically. The
14 City of London, Driver Development Program (May 2017), Section 15.0 Railroad Crossings, p. 9. 15 City of London, Environmental Services Department, Outside Works Division, Employee Rules and Regulations (April 1996), Section 8.03 Railway Crossing Snowplowing, p. 28. 16 Operation Lifesaver is a railway industry group dedicated to promoting safety around railway infrastructure. 17 Operation Lifesaver, “Tips for Snow Plow Operators” [pamphlet].
14 | TRANSPORTATION SAFETY BOARD OF CANADA City offered no formal training programs to its snow-clearing contractors or to the employees of their contractors, nor did it give them the CN guidance letter on snow clearing. Neither Jackson Pools nor Wee Bee provided a formal training program to their employees. Any instructions to snowplow operators were given through informal communication. Jackson Pools did not provide the City with any documents relating to a training program for snowplow operators. Through informal communication with the City, or through previous experience, some employees at Jackson Pools and Wee Bee were aware of the requirement to raise the snowplow blade or blower and not to apply sand or salt over crossings. They raised the blade to a height where it would not damage the track. Some snow-clearing contractor companies advised their operators to raise the blade just to a height that would not damage the track when travelling over crossings, while other companies advised their operators to raise their blade above the snow. Neither Jackson Pools nor Wee Bee had been aware of Operation Lifesaver. 1.13 The snowplow operator The snowplow operator had worked for Jackson Pools from September 2017 to December 2017 as a seasonal construction worker. During that period, he was trained in the operation of Bobcat S130 model vehicles. He had operated various off-road vehicles and equipment for at least 5 years.18 Starting in December 2017, he was employed by Wee Bee to clear snow from sidewalks, which was a new job for him. On 15 December 2017, the snowplow operator worked his first shift clearing snow. During that shift, he cleared snow from sidewalks on Beat 1, which included the Colborne Street public crossing. At the time of the occurrence, the snowplow operator was working his 5th shift that involved clearing snow from sidewalks. During the 3 previous shifts, he had been assigned to Beat 16, which included some railway crossings. Although Wee Bee had given the snowplow operator informal training on operating the snowplow, he had not received specific training or advice on how to cross a railway crossing safely in a snowplow. On the morning of 08 January 2018, the snowplow operator woke up at about 1115 and remained awake for the rest of the day. At about 2040, he received a call from Wee Bee informing him that he would be working that night. The snowplow operator was picked up at about 2230 and began his shift shortly afterward. When not working, the snowplow operator typically went to bed between midnight and 0600 and would wake up in the morning or early afternoon. He had not worked during the 2 days preceding the occurrence.
18 The snowplow operator was also a qualified aerial lift operator and a qualified forklift driver.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R18T0006 | 15 The snowplow operator held a G119 driver’s licence, as he had not yet passed the on-road portion of the licence examination to receive a G2 licence. He had not enrolled in any practical driving instruction courses. The snowplow operator did not hold a Class G driver’s licence, which the City’s contract required. Having grown up in London, the snowplow operator was familiar with the road environment near the Colborne Street public crossing. However, he had limited experience with the crossing as a motor vehicle driver, and so was likely not familiar with the number of active tracks (3), the crossing geometry (including width and length), and any sightline challenges from a position on the east sidewalk facing north. 1.14 Ontario Occupational Health and Safety Act In Ontario, provincially regulated employers are subject to the Occupational Health and Safety Act (the Act). The provincial Minister of Labour is responsible for administering the Act and has a number of powers and duties, including • promoting occupational health and safety and the prevention of workplace injuries and occupational diseases; • promoting public awareness of occupational health and safety; • educating employers, workers, and others about occupational health and safety; • fostering a commitment to occupational health and safety among employers, workers, and others; and • providing grants, in such amounts and on such terms as the Minister considers advisable, to support occupational health and safety.20 Under section 1 – Definitions of the Act, an employer means a person who employs one or more workers or contracts for the services of one or more workers and includes a contractor or subcontractor who performs work or supplies services and a contractor or subcontractor who undertakes with an owner, constructor, contractor or subcontractor to perform work or supply services21 Part III – Duties of Employers and Other Persons states: Duties of employers
19 A G1 licence is the first stage of the Province of Ontario’s graduated driver’s licensing system. This system uses a multi-tiered approach to licensing to help novice drivers (regardless of their age) gain experience while at the same time managing the risks they pose to themselves and others. A G1 driver’s licence comes with multiple restrictions designed to keep new drivers safe. Ontario’s Highway Traffic Act, Ontario Regulation 340/94, outlines the requirements for obtaining a driver’s licence in Ontario. For drivers with a G1 licence, this regulation places conditions on the allowable blood-alcohol level, the time of day during which the driving occurs, and the number of passengers in the car. As well, a G1 licence requires that a fully licensed driver with a minimum of 4 years of driving experience be in the front passenger seat. 20 Government of Ontario, R.S.O. 1990, c. O.1, Occupational Health and Safety Act, Part II, subsection 4.1(2). 21 Ibid., Part I, section 1.
16 | TRANSPORTATION SAFETY BOARD OF CANADA 25 … Without limiting the strict duty imposed by subsection (1), an employer shall,
(a) provide information, instruction and supervision to a worker to protect the health or safety of the worker; […]
(d) acquaint a worker or a person in authority over a worker with any hazard in the work and in the handling, storage, use, disposal and transport of any article, device, equipment or a biological, chemical or physical agent; […]
(h) take every precaution reasonable in the circumstances for the protection of a worker; […] Additional duties of employers 26 (1) In addition to the duties imposed by section 25, an employer shall, […]
(k) where so prescribed, provide a worker with written instructions as to the measures and procedures to be taken for the protection of a worker; and
(l) carry out such training programs for workers, supervisors and committee members as may be prescribed.22 Under the Act, the Occupational Health and Safety Awareness and Training Regulation was developed to ensure that workers who perform work for an employer, and supervisors who oversee that work, complete a basic occupational health and safety awareness training program. The training program for workers must cover the following topics:
- the duties and rights of workers under the Act;
- the duties of employers and supervisors under the Act;
- the roles of health and safety representatives and joint health and safety committees
under the Act;
- the roles of the Ministry, the Workplace Safety and Insurance Board, and entities
designated under section 22.5 of the Act with respect to occupational health and safety;
- common workplace hazards;
- the requirements set out in Regulation 860 (Workplace Hazardous Materials
Information System (WHMIS)) with respect to information and instruction on controlled products; and
- occupational illness, including latency.
The training program for supervisors must cover the following topics:
- the duties and rights of workers under the Act;
- the duties of employers and supervisors under the Act;
- the roles of health and safety representatives and joint health and safety committees
under the Act;
22 Ibid., Part III, sections 25 and 26.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R18T0006 | 17
- the roles of the Ministry, the Workplace Safety and Insurance Board, and entities
designated under section 22.5 of the Act with respect to occupational health and safety;
- how to recognize, assess, and control workplace hazards, and evaluate those
controls; and
- sources of information on occupational health and safety.
No employer can contract out to a third party the obligations imposed upon them under the provisions of the Act.23 1.15 Audio analysis during re-enactment at the crossing On 20 February 2018, audio measurements were taken at the Colborne Street public crossing to assess train horn audibility. During the audio testing, a locomotive similar to CN 5605 (CN 5601) and a snowplow similar to the occurrence snowplow were used. Audio measurements were taken from both inside the snowplow and outside the snowplow. These measurements were taken • with the window open and the window closed, • with the locomotive blowing its horn, and • with the train travelling at speeds similar to the occurrence. There are 3 levels of audibility of a sound stimulus: • The threshold level for detection occurs when a sound is simply recognized as being present. This needs to be 6.5 dB above the background noise. However, no other characteristics of the sound may be known. • The recognition level normally occurs between 3 dB to 8 dB above the threshold level of detection. • The alerting level of an auditory stimulus occurs at the point at which a person would become aware of and alerted to its presence. This typically occurs when the sound rises at least 15 dB above any background noise level.24 Based on the audio analysis, the following was determined: • With the snowplow’s windows open, the train horn level rose above the background noise to an alerting level about 3 seconds prior to the locomotive entering the crossing. • With the snowplow’s windows closed, the train horn level was at an alerting level less than 1 second prior to the locomotive entering the crossing.
23 R v. Grant Forest Products Inc., [2002] O.J. No. 3374, pp. 11–12, and Ontario (Ministry of Labour) v. Sunrise Propane Energy Group Inc., [2013] O.J. No. 3086, pp. 46, 58-59, 63–64. 24 S. Fidell, “Effectiveness of audible warning signals for emergency vehicles,” Human Factors, Vol. 20 (1978), pp. 19–26.
18 | TRANSPORTATION SAFETY BOARD OF CANADA • Under the occurrence conditions, the audio levels from the train horn and the crossing bell that the snowplow operator perceived were likely insufficient to alert the operator to the oncoming train with sufficient time to avoid the impact. • It was not possible to determine whether the snowplow operator’s earphones were in use at the time of the occurrence. However, their use would have had a minimal effect on the audibility of the train horn. Train horns are often described as a secondary alerting system because their effectiveness is influenced by other factors.25 A number of TSB investigations26 have shown that the effectiveness of the horn can be compromised by the speed of the train, the dampening of sound through the road vehicle shell, and the ambient noise present within the vehicle. 1.16 Sightline from within the snowplow cab With the snowplow positioned in the southeast quadrant of the crossing so that the operator was approximately adjacent to the GCWDs, the southeast warning system mast, lights, and gates were approximately 90° from the operator’s forward view. At this position, when the operator was looking straight ahead, the lights and gates would not have been in his forward view. In addition, at this position, the A-pillar (front left pillar) of the snowplow cab frame obstructed the view of • the northwest crossing mast, • the gate (even if it was in the full down position), • the lights facing south that were affixed to the mast, and • the lights facing south that were affixed to the cantilever above the road (Figure 5).
25 G. W. English, F. A. Russo, and T. N. Moore, TP 14103E, Locomotive Horn Evaluation: Effectiveness at Operating Speeds (June 2003), prepared for the Transportation Development Centre, Transport Canada, by TransSys Research Ltd.. 26 TSB railway investigation reports R13D0001, R13W0083, R12W0182, R11T0175, R10W0123, R08M0002, R04H0014, and R02W0063.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R18T0006 | 19 Figure 5. Photo taken from a driver’s seated eye position in the snowplow showing the view toward the northwest quadrant of the crossing when the snowplow was positioned adjacent to the southeast quadrant crossing warning system mast (the location of the snowplow when the gates began to descend) (Source: TSB)
When the snowplow operator was adjacent to the crossing mast in the southeast quadrant of the crossing, the lights and gates in the northwest quadrant were more than 30° from the forward view (Figure 6). The viewing angles of the crossing lights and gates in the northwest quadrant from the snowplow cab were more than 50° from the forward view when the snowplow occupied the 1st set of tracks.
20 | TRANSPORTATION SAFETY BOARD OF CANADA Figure 6. Location of the snowplow and viewing angles from the cab to the grade crossing warning devices (Source: Google Earth, with TSB annotations)
- 17
Hazard detection and information processing by humans Because human information processing takes place constantly, and because there is so much information available in the environment, people must cope with this flow by filtering out less important information to attend to the important information. However, although they are able to switch attention rapidly from one information source to another, humans can attend well to only one information source at a time,27 particularly when driving. For drivers to interrupt what they are doing to react to a hazard, a condition, or a stimulus, it needs to be visible or detectable (available to the senses), perceived (assigned meaning), and recognized (as sufficiently important). The field of view of human vision is large, extending 90° to the left and 90° to the right. The peripheral visual field makes up approximately 90% of the total field of vision; only a small area—a cone of approximately 2° to 3° directly ahead of the viewer—allows for clear and
27 P. L. Olson, R. Dewar, and E. Farber, “Vision, audition, vibration and processing of information,” in: Forensic Aspects of Driver Perception and Response, 3rd edition (Tucson, AZ: Lawyers & Judges Publishing Company, 2010), ch. 3.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R18T0006 | 21 accurate vision.28 Outside of this cone, visual acuity and contrast sensitivity29 drop rapidly, so it is important for motor vehicle drivers to search visually for trains at railway crossings. Whether or not a driver chooses to search visually at a railway crossing, and despite limits in acuity and contrast sensitivity, an approaching train is most likely to be detected first in a driver’s peripheral visual field because the eye is more sensitive to movement in the periphery than in central vision.30 A vehicle operator intently focusing attention at a fixation point is less likely to notice objects in the visual periphery—a phenomenon referred to as tunnel vision or attentional narrowing. Several factors can lead to tunnel vision,31 including • deep concentration on a difficult task, • limited experience performing a task, • the effects of fatigue, • the effects of drugs or alcohol, • increased workload, and • environmental stressors such as loud noises. 1.18 Vehicle operator attention Human attention and the capacity to process information are limited. These limitations can create difficulties, as operating any kind of vehicle requires the division of attention among control tasks (such as staying in the lane or on the sidewalk), guidance tasks (such as avoiding uneven surfaces), and navigational tasks (such as looking for street name signs).
28 J. Osaka, “Speed estimation through restricted visual field during driving in day and night: Naso-temporal hemifield differences,” in A. G. Gale, M. H. Freeman, C. M. Haslegrave, et al. (eds), Vision in Vehicles II: Proceedings of the Second International Conference on Vision in Vehicles (Nottingham, UK, 14–17 September 1987), pp. 45–55. 29 M. Green, “Visibility Analysis 2,” in M. Green, M. J. Allen, B. S. Abrams, et al. (eds), Forensic Vision with Application to Highway Safety, 3rd edition (Tucson, AZ: Lawyers & Judges Publishing Company, 2008), pp. 311–312. 30 J. Osaka, “Speed estimation through restricted visual field during driving in day and night: Naso-temporal hemifield differences,” in A. G. Gale, M. H. Freeman, C. M. Haslegrave, et al. (eds), Vision in Vehicles II: Proceedings of the Second International Conference on Vision in Vehicles (Nottingham, UK, 14–17 September 1987), pp. 45–55. 31 M. Green, “Visibility Analysis 2,” in M. Green, M. J. Allen, B. S. Abrams, et al. (eds), Forensic Vision with Application to Highway Safety, 3rd edition (Tucson, AZ: Lawyers & Judges Publishing Company, 2008), pp. 311–312.
22 | TRANSPORTATION SAFETY BOARD OF CANADA Attentional resources are required for effective hazard detection32 and for maintaining situational awareness.33 The task of operating the snowplow to clear snow from sidewalks involved attending to controlling and guiding not only the vehicle, but also the snow blower, as well as monitoring the snow feed to ensure that it was not contaminated with objects that could be thrown from the blower. It is common for a snowplow operator’s attention to be focused either straight ahead at the oncoming sidewalk or off to the right to monitor the placement of snow. 1.19 Expectations and knowledge Expectations about a situation can affect whether and how appropriately a vehicle operator will respond to hazards in the environment. When people receive information that they expect to receive, they tend to react quickly and without making errors. However, when they receive information that is contrary to their expectations, their performance tends to be slow or inappropriate.34 Training and experience enhance a person’s knowledge and understanding of a situation or environment. Vehicle operators who are learning new tasks, or new aspects of a familiar task, tend to devote more attention to and experience higher levels of workload than more experienced drivers when engaged in the new, unpractised tasks.35 1.20 Fatigue Recent research36 shows that, similar to commercial motor vehicle drivers, winter maintenance operators (i.e. snowplow operators) are likely to be at an increased risk of becoming fatigued while driving due to long shifts, environmental stressors, and limited opportunities for sleep. Fatigue can impair information-processing speed, slow active eye
32 P. N. J. Lee and T. J. Triggs, “The effects of driving demand and roadway environment on peripheral visual detections,” APRB Proceedings, 8 (1976), pp. 7–12. 33 M. R. Endsley, “Toward a theory of situation awareness in dynamic systems,” Human Factors, Vol. 37, No. 1 (1995), pp. 32–64. 34 G. J. Alexander and H. Lunenfeld, “Driver expectancy in highway design and traffic operations,” U.S. Department of Transportation report no. FHWA-TO-86-1, April 1986. 35 C. J. D. Patten, A. Kircher, J. Östlund, et al., “Driver experience and cognitive workload in different traffic environments,” Accident Analysis & Prevention, 38 (2006), pp. 887–894. 36 M. C. Camden, A. Medina-Flintsch, J. S. Hickman, et al., “Prevalence of operator fatigue in winter maintenance operations,” Accident Analysis and Prevention, 126 (2019), pp. 47-53.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R18T0006 | 23 movements, and limit a person’s ability to process information from the peripheral visual field.37 Research38 shows that uncontrollable brief episodes of sleep, commonly known as “micro- sleeps” (sleep lasting 3 to 4 seconds) and “state instability” (because wakefulness cannot be maintained), begin to occur in most individuals after 22 hours of continuous wakefulness. This is therefore considered to be the threshold at which fatigue causes almost all aspects of human performance to decline. Unlike sleep-related fatigue, mental (or “task-related”) fatigue is a psychological state that results from spending extended or intense periods of time on a task.39,40 Although people experiencing mental fatigue may feel tired, they do not necessarily fall asleep more quickly than a normally rested person; that is, they are not necessarily “sleepy.” Concentrating for long periods of time can result in mental fatigue and corollary performance impairments, including decreased vigilance and situational awareness, and reduced attention-switching abilities.41 1.21 Effects of tetrahydrocannabinol on human cognitive functions Tetrahydrocannabinol (THC) is the principal psychoactive cannabinoid42 found in marijuana and hashish and their derivatives. Acute THC intoxication impairs several cognitive functions that are involved in the safe operation of motor vehicles, including a person’s ability to divide attention among multiple tasks.43
37 N. A. Kaluger and G. L. Smith, “Driver eye movement pattern under conditions of prolonged driving and sleep deprivation,” Highway Research Record, 336 (1995), pp. 92–106. 38 M. Beaumont, D. Batejat, C. Pierard, et al., “Slow release caffeine and prolonged (64-h) continuous wakefulness: Effects on vigilance and cognitive performance,” Journal of Sleep Research, Vol. 10, No. 4 (2001), pp. 265–276. 39 T. J. Balkin and N. J. Wesensten, “Differentiation of Sleepiness and Mental Fatigue Effects,” in P.L. Ackerman (ed.), Cognitive Fatigue: Multidisciplinary Perspectives on Current Research and Future Applications (Washington, DC: American Psychological Association, 2011), pp. 47–66. 40 J. Leonard, L. J. Trejo, R. Kochavi, et al., “Measures and Models for Estimating and Predicting Cognitive Fatigue,” Proceedings of the 44th Annual Meeting of the Society for Psychophysiological Research (Santa Fe, NM, 2004). 41 M. A. S. Boksem, T. F. Meijman and M. M. Lorist, “Effects of mental fatigue on attention: An ERP study,” Cognitive Brain Research, 25 (2005). 42 A cannabinoid is any of a group of closely related compounds, which include cannabinol and the active constituents of cannabis. 43 P. Bondallaz, H. Chtioui, B. Favrat, et al., “Assessment of Cannabis Acute Effects on Driving Skills: Laboratory, Simulator, and On-road Studies,” in: V. R. Preedy (ed.), Handbook of Cannabis and Related Pathologies (Cambridge, MA: Academic Press, 2017), pp. 379–390.
24 | TRANSPORTATION SAFETY BOARD OF CANADA Both immediate and long-term exposure to THC impair driving ability and increase the risk of being involved in a motor-vehicle accident.44,45 According to a meta-analysis review of experimental studies, THC concentration of between about 3.5 and 5 nanograms per millilitre (ng/ml)46 in the blood correlates with driving impairment comparable to that caused by a blood alcohol concentration of 0.05%, and has therefore been proposed as a suitable legal driving limit.47 On 17 October 2018, it became legal in Canada for adults to possess small amounts of cannabis.48 However, it is illegal to operate a motor vehicle while drug-impaired.49 The maximum legal concentration of THC in the blood within 2 hours of driving is 2.0 ng/mL.50 In Ontario, as of 01 July 2018, young drivers, novice drivers, drivers of vehicles requiring a Class A to F licence, drivers of vehicles requiring a Commercial Vehicle Operator’s Registration, and drivers of road-building machines are prohibited from having any THC in their system.51 Legal limits for driving under the influence of THC differ around the world. For example, in the U.S., where some states permit the use of THC, the legal driving limits range from 1 ng/mL (Pennsylvania) to 5 ng/mL (Washington, Colorado, Montana). In the European Union, the legal driving limits range from 0.5 ng/mL to 3 ng/mL.52 When THC concentrations in the blood following toxicology testing are interpreted, a number of factors can significantly influence the results, including these: • THC is detectable in blood for up to 2 days after use. However, even a high dose of smoked THC typically causes acute impairment of driving skills for only 3 to 4
44 N.D. Volkow, M. D. Ruben, D. Baler, et al., “Adverse health effects of marijuana use,” The New England Journal of Medicine, Vol. 370, No. 23 (2014), pp. 2219–2227. 45 O. Rogeborg and R. Elvik, “The effects of cannabis intoxication on motor vehicle collision revisited and revised,” Addiction, Vol. 111, No. 8 (2016), pp. 1348–1359. 46 Equivalent to 7 to 10 ng/mL in serum. 47 F. Grotenhermen, G. Leson, G. Berghaus, et al., “Developing limits for driving under cannabis,” Addiction, Vol. 102, No. 12 (2007), pp. 1910–1917. 48 Government of Canada, Cannabis Act, S.C., 2018, c. 16, paragraph 8(1)(a). 49 Government of Canada, Criminal Code, R.S.C., 1985, c. C-46, paragraph 253(1)(a). 50 Department of Justice Canada, Blood Drug Concentration Regulations, SOR/2018-148, section 1. 51 Government of Ontario, “Cannabis and driving,” at https://www.ontario.ca/page/cannabis-and-driving (last accessed on 22 May 2019). 52 K. Wong, J. E. Brady and G. Li, “Establishing legal limits for driving under the influence of marijuana,” Injury Epidemiology, Vol. 1, No. 26 (2014).
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R18T0006 | 25 hours.53 Recency of use is therefore an important factor in estimating level of impairment. • An individual’s pattern of use can also affect THC pharmacokinetics.54 Positive blood THC levels in habitual, regular cannabis users do not necessarily signify recent use.55 An autopsy was performed on the operator’s body about 23 hours after the occurrence. Toxicology test results were positive for THC, indicating that there was a concentration of 11.9 (+/− 1.5) ng/mL of THC in femoral blood. No drug paraphernalia was found on or near the snowplow operator’s body following the occurrence. However, the investigation determined that the snowplow operator had been smoking cannabis regularly for many years, and was a habitual user. Interpreting post-mortem levels of THC in blood is complicated by post-mortem redistribution, which results in changes to THC concentrations (either increasing or decreasing) in the blood after death. These factors mean that it is not possible to reliably correlate post-mortem blood concentrations of THC with performance impairment effects at, or near, the time of death. Similarly, post-mortem blood THC cannot accurately estimate pre-mortem timing of last use. 1.22 Other crossing accidents involving snow-clearing equipment On 24 January 2013, at 0856 Central Standard Time, eastbound CN freight train L51141-23 struck a road grader that had stopped on the public grade crossing at Mile 33.70 of the Blackfoot Subdivision, in Saskatchewan.56 As a result of the collision, the grader operator was fatally injured. The road grader was heavily damaged. The train crew were not injured. The locomotive and 16 tank cars carrying dangerous goods derailed. Approximately 106 000 L of crude oil were released from 4 cars. At the time of the collision, the grader operator was resetting the road grader’s blades for snow-clearing operations. The investigation found that With the grader operator’s attention likely focused on resetting the road grader’s blades for snow clearing in the vicinity of the crossing, the operator did not detect the approaching train from the west.
53 F. Grotenhermen, G. Leson, G. Berghaus, et al., “Developing limits for driving under cannabis,” Addiction, Vol. 102, No. 12 (2007), pp. 1910–1917. 54 Pharmacokinetics means the mechanisms of bodily absorption, distribution, metabolism, and excretion of a drug or substance. 55 R. B. De Boni, R. P. Limberger and T. R. V. Sousa, “Cannabis and Traffic Accidents,” in: V. R. Preedy, Handbook of Cannabis and Related Pathologies (Cambridge, MA: Academic Press, 2017), pp. 234–243. 56 TSB Railway Investigation Report R13E0015.
26 | TRANSPORTATION SAFETY BOARD OF CANADA On 23 December 2013, at 0328, Canadian Pacific Railway freight train 132-22 was proceeding eastward at 50 mph through Perth, Ontario, when it struck a dump truck that was occupying the Wilson Street public crossing at Mile 12.44 of the Belleville Subdivision while participating in snow-clearing operations.57 The crossing was equipped with an automated warning system, including flashing light signals, bell, and gates. Following the collision, the truck was dragged about 2300 feet before it came to rest at approximately Mile 12.0. The vehicle operator sustained serious but non-life-threatening injuries. The truck was destroyed and the locomotive was damaged. The GCWDs at Wilson Street and Drummond Street (Mile 12.20) were also damaged. It was determined that • the truck driver was not specifically aware of the risks posed while working near railway infrastructure; and • no safety briefing was held before the work started, contrary to common practice in other industries. Since 2009, there have been 4 other occurrences where a train struck a snowplow or a similar type of vehicle at a federally regulated crossing.58 1.23 TSB laboratory reports The TSB completed the following laboratory reports in support of this investigation: • LP023/2018 – Audio Analysis • LP024/2018 – Cell Phone Analysis • LP037/2018 – Video Analysis
57 TSB Rail Safety Information Letter 01/14; TSB Occurrence R13T0287. 58 TSB occurrences R14T0096, R13D0092, R10M0001, and R09E0005.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R18T0006 | 27 2.0 ANALYSIS Neither the actions of the train crew nor the condition of the equipment or the rolling stock were contributing factors to the accident. There was no indication that the snowplow operator had any medical or psychological condition that would have contributed to the accident. The analysis will focus on the conditions leading to the snowplow operator being unaware of the oncoming train, training, the level of oversight of snow-clearing contractors by Jackson Pools Inc. (Jackson Pools) and the City of London (the City), and the effectiveness of grade crossing warning devices (GCWDs) during sidewalk snow-clearing activities. 2.1 The accident The accident occurred when the snowplow travelled onto the railway crossing while continuing to clear snow from the sidewalk. The horn of the approaching train was sounded before the snowplow occupied the south main track; however, the snowplow operator was not alerted to the oncoming train and the snowplow continued onto the track, where it was struck by freight train Q14891-08 (the train). The snowplow was clearing snow from the sidewalk as it approached, and then travelled onto, the crossing from the south. The lights in the southeast quadrant of the crossing first activated when the snowplow was adjacent to the crossing warning system mast and gate. Owing to the positioning of the snowplow beside the south GCWDs when they became active, the flashing lights were not in the operator’s field of view and therefore did not alert him to the presence of the oncoming train. He continued past the crossing mast and gate and, as he was approaching the tracks, the gates began to descend. When the snowplow had reached the southern-most track, the gates had completed their descent. The snowplow continued forward onto the south main track, where the collision occurred. As the snowplow travelled onto the crossing and into the path of the train, the snowplow operator’s attention was focused either directly forward at the sidewalk that was about to be cleared of snow or off to the right-hand side where the snow was being thrown toward the east. As a result, the crossing warning system mast and gate in the northwest quadrant of the crossing, as well as the lights on the cantilever, were in the operator’s peripheral visual field, reducing the likelihood that they would be detected. The operator’s view from the cab of the snowplow was restricted. The front-left cab frame pillar obstructed the sightlines to the crossing lights and gates in the northwest quadrant when the snowplow was on the crossing. As well, the screening on the side windows hindered the view along the tracks. The restricted sightline further reduced the likelihood of the operator detecting the activated GCWDs or the oncoming train. The bells at a crossing, and the train horn, are meant to alert crossing users to the presence of a train. However, the background noise of the operation of the snowplow prevented both the crossing bell and the train horn from alerting the operator.
28 | TRANSPORTATION SAFETY BOARD OF CANADA 2.2 Visual scanning at the crossing The speed at which the snowplow was travelling on the crossing was conducive to stopping quickly in advance of the train, if the operator had detected the train. However, the snowplow did not stop to avoid the train. Moreover, adjustment of the blower just before the plow occupied the south main track indicates that the operator’s attention at that time was directed to his right, away from the direction of the oncoming train. The operator did not look toward the train during the seconds leading up to impact. Therefore, the investigation determined that the snowplow operator was focused on clearing snow at the crossing and was not monitoring for approaching trains. Training, experience, and expectations can influence the effectiveness of a driver’s visual search for trains and warning cues at railway crossings. The snowplow operator was not experienced at clearing snow from crossings, having worked just 5 shifts in total; it was only his 2nd shift involving the accident crossing. In addition, he was not an experienced motor vehicle driver and had received little, if any, training on how to approach and operate over railway crossings. His limited experience with railway crossings in general, and with the occurrence crossing in particular, and his lack of training on safe working practices when clearing snow at railway crossings inhibited the effectiveness of the operator’s visual scanning. As a result, he did not detect the oncoming train. The snowplow operator, who had been awake for more than 22 hours and on the job for about 11 hours, was likely experiencing fatigue. Due to a combination of the effects of fatigue, the effects of an increased demand for attentional resources from a relatively new and complex task of clearing snow, and the effects of loud background noise from the snowplow, the snowplow operator was likely experiencing tunnel vision or attentional narrowing toward the snow-clearing task. The effect of tunnel vision exacerbated by fatigue likely also diminished the snowplow operator’s visual scanning behaviour in the moments leading up to the occurrence. 2.3 Fatigue Many cities across Canada have railway crossings with sidewalks that need to be cleared of snow at some point during the winter. Because the timing of the snowfall is somewhat predictable, snowplow operators in these cities have some warning time prior to beginning their shift to adjust their wake–rest pattern to ensure that they attain adequate rest. However, sometimes the amount of warning time provided is not long enough for the operator to obtain adequate rest, or occurs at a time during the operator’s wake–rest cycle that is not conducive to resting. In these instances, it may not be possible for snowplow operators to obtain the rest required to remain alert during an entire 12-hour shift. Due to the nature of the work, snowplow operators cannot always obtain adequate restorative rest.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R18T0006 | 29 2.4 Tetrahydrocannabinol Post-mortem toxicology testing determined that tetrahydrocannabinol (THC) was present in the snowplow operator’s system, indicating that he had consumed cannabinoids at some point before the accident. THC has been shown to affect cognitive function and performance, and is associated with an increased risk of traffic accidents. Although the amount of THC present in the snowplow operator’s blood exceeded the legal limits for driving, the time at which the THC was last used could not be determined, nor could it be determined whether impairment was a factor in this occurrence. Regardless, the use of THC by vehicle operators can lead to impaired cognitive function and performance. 2.5 Training Under the Ontario Occupational Health and Safety Act (the Act), employers have concurrent responsibility to ensure the health and safety of employees and to take every precaution reasonable in the circumstances to protect a worker. The Act and the Ontario Occupational Health and Safety Awareness and Training Regulation require employers to provide information, instruction, and supervision to workers to protect their health and safety; to ensure that workers, or persons in authority over workers, are informed of any safety hazard and the measures and procedures to be taken to ensure the workers’ safety; and to ensure that workers are adequately trained. In this occurrence, employers did not provide any training to the snowplow operator. The City has a training program to instruct its employees on the proper and safe execution of their duties, including sidewalk plowing. To ensure that the training program is complete, the City has also undertaken risk assessments on individual tasks, including sidewalk plowing and sanding. Employees’ attendance at these courses is tracked and monitored, and any requirement for recurrent training is identified. With these procedures, the City’s objective is to prepare its sidewalk snowplow operators with the information, training, and supervision they need to perform their duties safely. The City also stipulated training requirements for contractor employees in its contracts. However, Jackson Pools did not have programs for its snowplow operators or for its subcontractors. Wee Bee Contracting (Wee Bee) hired an inexperienced employee who did not hold a Class G licence and provided no formal training program to ensure that the employee had the skills and knowledge to perform his duties safely. As a result, the employee received no formal training and instruction on safely operating over railway crossings or on clearing snow from sidewalks over railway crossings. 2.6 Oversight of contractors To fulfill the conditions of the snow-clearing contract with the City, Jackson Pools had 1 snowplow, and the necessary operators, dedicated to snow removal. Jackson Pools had
30 | TRANSPORTATION SAFETY BOARD OF CANADA also subcontracted to Wee Bee the use of 2 additional snowplows and the necessary operators. Despite certain requirements specified in the contract with the City, and the responsibilities under the provincial act, Jackson Pools did not ensure that Wee Bee had a training program that met the requirements of the Occupational Health and Safety Awareness and Training Regulation, or that the Wee Bee operators were fully informed of the workplace hazards, and related work procedures, while on duty. In addition, Jackson Pools did not ensure that all Wee Bee operators met the requirements specified in the contract. Therefore, the oversight by Jackson Pools did not ensure that its employees and subcontractors assigned to the snow-clearing contract for the City were properly trained and qualified. The City, through its tendering process, placed requirements on its contractors to ensure that the contractors’ operators were qualified to perform their duties safely. For example, the tender required the City’s contractors for sidewalk snow-clearing operations to submit a list of qualified machine operators, ensure that their operators had a Class G driver’s licence, be responsible for training those operators, and use only those operators on the list. Moreover, contractors were not to enter into any subcontracting agreement without first obtaining the City’s consent. Jackson Pools subcontracted part of the work under its City of London contract to Wee Bee without obtaining approval from the City. As well as not ensuring that the contractors had developed and conducted an adequate training program, the City did not maintain a list of qualified snowplow operators, did not ensure that only those operators on the list were used, did not ensure that no unapproved subcontractor was employed, and did not ensure that those operators maintained their Class G driver’s licence. Once the contract was awarded to the contractors, none of the requirements listed in the tender were verified. For this reason, the City’s oversight of its snow-clearing contractors did not identify that snowplow operators did not have sufficient training and qualifications to perform their duties safely. 2.7 Safe work procedures at crossings during snow-clearing operations The snowplow was travelling at about 1.5 km/h while clearing snow over the railway crossing. The GCWD provided about 30 seconds of warning time from when the bell and lights were first activated to when the train occupied the crossing. The snowplow would have taken more than 60 seconds to travel from the gate to a position clear of the far track, assuming that it did not stop to perform additional snow clearing. As a result, the GCWD does not provide adequate protection for machines performing snow clearing on the crossing, particularly when they are travelling at a slow speed, nor is the GCWD intended to do so. Because the GCWD is not designed to protect crews while they are clearing snow on the crossing, safe work procedures are required. If snow-clearing contract companies do not have safe work procedures and related training in place for work at railway crossings, there is an increased risk of crossing accidents.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R18T0006 | 31 3.0 FINDINGS 3.1 Findings as to causes and contributing factors 1. The accident occurred when the snowplow travelled onto the railway crossing while continuing to clear snow from the sidewalk. 2. Owing to the positioning of the snowplow beside the south grade crossing warning devices when they became active, the flashing lights in the southeast quadrant were not in the operator’s field of view and therefore did not alert him to the presence of the oncoming train. 3. The crossing warning system mast and gate in the northwest quadrant of the crossing, as well as the lights on the cantilever, were in the operator’s peripheral visual field, reducing the likelihood that they would be detected. 4. The restricted sightline due to the cab frame pillar and the screening on the side windows further reduced the likelihood of the operator detecting the activated grade crossing warning devices or the oncoming train. 5. The background noise of the operation of the snowplow prevented both the crossing bell and the train horn from alerting the operator. 6. The snowplow operator was focused on clearing snow at the crossing and was not monitoring for approaching trains. 7. The snowplow operator’s limited experience with railway crossings in general, and with the occurrence crossing in particular, and his lack of training on safe working practices when clearing snow at railway crossings inhibited the effectiveness of the operator’s visual scanning. As a result, he did not detect the oncoming train. 8. The effect of tunnel vision exacerbated by fatigue likely also diminished the snowplow operator’s visual scanning behaviour in the moments leading up to the occurrence. 9. Wee Bee Contracting hired an inexperienced employee who did not hold a Class G licence and provided no formal training program to ensure that the employee had the skills and knowledge to perform his duties safely. 10. The oversight by Jackson Pools Inc. did not ensure that its employees and subcontractors assigned to the snow-clearing contract for the City of London were properly trained and qualified. 11. The oversight by the City of London of its snow-clearing contractors did not identify that snowplow operators did not have sufficient training and qualifications to perform their duties safely.
32 | TRANSPORTATION SAFETY BOARD OF CANADA 3.2 Findings as to risk 1. If snow-clearing contract companies do not have safe work procedures and related training in place for work at railway crossings, there is an increased risk of crossing accidents. 3.3 Other findings 1. Due to the nature of the work, snowplow operators cannot always obtain adequate restorative rest. 2. The time at which the tetrahydrocannabinol was last used could not be determined, nor could it be determined whether impairment was a factor in this occurrence. 3. The use of tetrahydrocannabinol by vehicle operators can lead to impaired cognitive function and performance.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R18T0006 | 33 4.0 SAFETY ACTION 4.1 Safety action taken 4.1.1 City of London Following the accident, the City of London required snowplow operators employed by its sidewalk snow-clearing contractors to participate in a City-led review of safe operating practices at railway crossings. Guidance documents on clearing snow at crossings were distributed to snowplow operators at this review session. This report concludes the Transportation Safety Board of Canada’s investigation into this occurrence. The Board authorized the release of this report on 08 May 2019. It was officially released on 17 July 2019. Visit the Transportation Safety Board of Canada’s website (www.tsb.gc.ca) for information about the TSB and its products and services. You will also find the Watchlist, which identifies the key safety issues that need to be addressed to make Canada’s transportation system even safer. In each case, the TSB has found that actions taken to date are inadequate, and that industry and regulators need to take additional concrete measures to eliminate the risks.
FD06106 | 2018_加拿大运输安全委员会_商船三井_Prestige机舱起火_M18P0014_火灾报告(英文).md
分类:06_境外及港澳台调查报告 | 年份:2018 | 地域: | 严重程度: | 场所: | 起火原因:燃气/爆炸 | 来源格式:md
1. 标题与报告编号
- 标题:Marine transportation safety investigation report — MOL Prestige engine room fire
- 报告编号:M18P0014
2. 机构与发布日期
- 机构:Transportation Safety Board of Canada(TSB)
- 事故日期:2018 年 1 月 31 日
3. 事故摘要
- 日期/地点:2018 年 1 月 31 日;Haida Gwaii 西南 146 海里,British Columbia 外海
- 事件:集装箱船 MOL Prestige 海上 机舱起火。船上 22 名船员 +1 名随船人员;5 名船员重伤。RCAF 直升机后送 2 人就医。CCGS Sir Wilfrid Laurier 协助;救助拖轮拖往 Seattle。
- 火灾:起源于 3 层甲板辅锅炉与沉淀柜之间;开口液位指示管喷出高温 HFO 发生 frothover(溢沸),蒸汽爆炸并起火。
4. 原因 / 发现
- 沉淀/日用柜液位指示器失效;盲法兰未装;高温报警设高于安全上限 30°C。"高温…与开口液位指示管…共同造成不安全条件致 frothover"。
- 逃生:船员被困 ECR;2016 前船舶不要求 SOLAS 逃生评估——"提供的逃生手段可能不足"风险。
- 应急演习:未全部练习穿戴设备;情景不真实——"船员可能无准备"风险。
- 固定灭火:CO₂ 系统泄漏未检出;无定期压力测试要求。
- 安全管理:经审核的 SMS 未及时纠正隐患。
5. 安全行动(建议风险缓解)
- 确保设备安全维护、及时有效缓解隐患;2016 前货船按 SOLAS 等效评估逃生路线;定期以真实情景演练;按制造商/法规维护固定灭火系统含分配系统完整性检查;建立有效 SMS 鼓励隐患识别与及时缓解。
FD06107 | 2018_加拿大运输安全委员会_西捷航空_B737行李舱锂电池起火_A18W0081_火灾报告(英文).md
分类:06_境外及港澳台调查报告 | 年份:2018 | 地域: | 严重程度: | 场所:电动车/电池 | 起火原因:燃气/爆炸;锂电池热失控 | 来源格式:md
1. 标题与报告编号
- 标题:Aviation transportation safety investigation report A18W0081 — Baggage compartment fire(WestJet Boeing 737-700, C-GWJT, Calgary)
- 报告编号:A18W0081
2. 机构与发布日期
- 机构:Transportation Safety Board of Canada(TSB)
- 发布:委员会授权 2018-12-28,正式发布 2019-01-18
3. 事故摘要
- 日期:2018 年 6 月 14 日
- 地点:Calgary, Alberta(航班 CYYC→CYVR,爬升中及返航)
- 航空器:WestJet Boeing 737-700(C-GWJT),航班 WJA113,载 2 机组、3 乘务、53 乘客
- 事件:起飞后爬升至 9000 英尺,0641:10 后货舱火警灯亮。机组按 QRH 执行 CARGO FIRE 程序,释放 1 瓶灭火瓶。0646 宣布 MAYDAY 返航 CYYC,10 分钟后落地。红外未见明火。所有人员撤离后打开后货舱,发现一旅客背包有火损。火损局限于该包及货舱防火衬板约 24×24 英寸区域。
4. 原因 / 结论
- 乘客在背包前袋 inadvertent 装入 2 块电子烟备用锂离子电池(在充电器内),背包经安检装入后货舱。
- TSB 工程实验室分析:充电器内 1 块电池发生 热失控(thermal runaway),内部材料完全烧尽;热失控很可能由外部损伤引起,但无法确定损伤发生于值机前或行李处理中。
- 行李安检(CATSA)旨在探测爆炸物而非电池等危险品;含危险品时由安检员送人工检查并通知航司判定能否运输。
5. 安全行动
- 锂电池受《危险品运输法规》约束;TC 2016 年安全建议警示电子烟及锂电池仅可随身带。
- 本事件中乘客虽知限制,但托运行李装舱前未被识别含危险品。责任分散于乘客、航司、安检,无单一主体能确保行李内容合规。
- TSB 发布安全信息,提示锂电池在行李中冒烟/起火/过热/爆炸风险上升(FAA 截至 2018-05-02 记录 206 起相关事件)。
FD06108 | 2018_加拿大运输安全委员会_西捷航空_Encore_DHC-8-402座舱冒烟_A18P0042_火灾报告(英文).md
分类:06_境外及港澳台调查报告 | 年份:2018 | 地域: | 严重程度: | 场所: | 起火原因:燃气/爆炸 | 来源格式:md
加拿大 TSB | WestJet Encore DHC-8-402 座舱冒烟紧急事件调查(A18P0042)
基本情况 / Incident summary
- 时间:2018年3月20日
- 运营方/机型:WestJet Encore Bombardier DHC-8-402(Dash 8 Q400),C-GJEN。
- 事件:在进近 Nanaimo 机场时,机组因座舱冒烟宣布紧急状态。飞机在 Nanaimo 着陆,乘客与机组撤离至跑道。无人员伤亡。共载 56 名乘客与 4 名机组,撤离耗时 62 秒。
原因 / Cause and findings
TSB 认定:涡轮滑油(turbine oil)泄漏进入压气机气流与座舱增压系统,导致座舱充满烟雾。
- 泄漏由 2.5 轴承碳封(2.5 bearing carbon seal)中的钢制弹簧(wave washer)碎裂所致。
- Pratt & Whitney Canada 在既往失效后已于 2016年10月及 2018年1月发布服务通告(Service Bulletin),后者要求更换封圈,但建议在发动机解体大修时进行,该发动机尚未大修故未完成。
- 事发后 WestJet 在全部 Q400 机队上采用了 P&WC 新开发的用于探测封圈即将失效的技术。
安全提示 / Safety message
TSB 赞扬 WestJet 机组反应迅速恰当,得以无伤、无损地完成着陆与撤离;空管与机场人员及时响应亦贡献了良好结果。
FD06109 | 2018_加拿大运输安全委员会_西捷航空_阳翼航空地面相撞起火撤离_A18O0002_火灾报告(英文).md
分类:06_境外及港澳台调查报告 | 年份:2018 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:md
1. 标题与报告编号
- 标题:Air transportation safety investigation A18O0002 — Ground collision, fire, and evacuation(WestJet B737-800 C-FDMB & Sunwing B737-800 C-FPRP, Toronto Pearson)
- 报告编号:A18O0002
2. 机构与发布日期
- 机构:Transportation Safety Board of Canada(TSB)
- 发布:2018 年 7 月 11 日;事发 2018 年 1 月 5 日
3. 事故摘要
- 日期/地点:2018 年 1 月 5 日;Toronto/Lester B. Pearson International Airport, Ontario
- 航空器:WestJet B737-800(C-FDMB,自 Cancun 抵达,停于 3 号航站楼 B 指廊 2 号滑行道,引擎与 APU 运转);Sunwing B737-800(C-FPRP,停 B13 廊桥,准备拖至内场)
- 事件:Sunwing 维护技师在驾驶舱、APU 运转,拖车开始后退,其 APU 接触静止 WestJet 飞机右翼,迅速起火(A fire rapidly ensued)。WestJet 机组立即启动撤离程序。拖车操作员将 Sunwing 飞机拉回廊桥分离两机。所有 WestJet 乘客经左前/后门、右前门及左翼上出口滑梯安全撤离;Sunwing 技师经左驾驶舱窗应急绳撤离,轻伤。ARFF 到场灭火。Sunwing 飞机严重受损。
4. 原因 / 结论
- 本调查为 class 4(limited scope,无 findings 或 recommendations)。直接事件为拖曳中 Sunwing APU 接触 WestJet 右翼引发 apron 地面碰撞火灾。
5. 安全行动
- class 4 调查不含建议;详见 2018-07-11 新闻稿(a18o0002-20180711)。
FD06110 | 2019_加拿大_TSBC_R19C0015_Rail_Fire_Investigation_2019.pdf
分类:06_境外及港澳台调查报告 | 年份:2019 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 UNCONTROLLED MOVEMENT OF ROLLING STOCK AND MAIN-TRACK TRAIN DERAILMENT Canadian Pacific Railway Company Freight train 301-349 Mile 130.6, Laggan Subdivision Yoho, British Columbia 04 February 2019
TRANSPORTATION SAFETY BOARD OF CANADA 2 ABOUT THIS INVESTIGATION REPORT This report is the result of an investigation into a class 2 occurrence. For more information, see the Policy on Occurrence Classification at www.tsb.gc.ca The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. TERMS OF USE Use in legal, disciplinary or other proceedings The Canadian Transportation Accident Investigation and Safety Board Act states the following: • 7(3) No finding of the Board shall be construed as assigning fault or determining civil or criminal liability. • 7(4) The findings of the Board are not binding on the parties to any legal, disciplinary or other proceedings. Therefore, the TSB’s investigations and the resulting reports are not created for use in the context of legal, disciplinary or other proceedings. Notify the TSB in writing if this report is being used or might be used in such proceedings. Non-commercial reproduction Unless otherwise specified, you may reproduce this investigation report in whole or in part for non-commercial purposes, and in any format, without charge or further permission, provided you do the following: • Exercise due diligence in ensuring the accuracy of the materials reproduced. • Indicate the complete title of the materials reproduced and name the Transportation Safety Board of Canada as the author. • Indicate that the reproduction is a copy of the version available at [URL where original document is available]. Commercial reproduction Unless otherwise specified, you may not reproduce this investigation report, in whole or in part, for the purposes of commercial redistribution without prior written permission from the TSB. Materials under the copyright of another party Some of the content in this investigation report (notably images on which a source other than the TSB is named) is subject to the copyright of another party and is protected under the Copyright Act and international agreements. For information concerning copyright ownership and restrictions, please contact the TSB. Citation Transportation Safety Board of Canada, Rail Transportation Safety Investigation Report R19C0015 (released 31 March 2022). Transportation Safety Board of Canada 200 Promenade du Portage, 4th floor Gatineau QC K1A 1K8 819-994-3741; 1-800-387-3557 www.tsb.gc.ca communications@tsb.gc.ca © Her Majesty the Queen in Right of Canada, as represented by the Transportation Safety Board of Canada, 2022 Rail transportation safety investigation report R19C0015 Cat. No. TU3-11/19-0015E-PDF ISBN: 978-0-660-42540-5 This report is available on the website of the Transportation Safety Board of Canada at www.tsb.gc.ca Le présent rapport est également disponible en français.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 3 Table of contents Executive summary ........................................................................................................... 7 1.0 Factual information ............................................................................................... 15 1.1 The territory ................................................................................................................................................15 1.2 The accident ...............................................................................................................................................17 1.2.1 Before the emergency stop ..................................................................................................17 1.2.2 While stopped in emergency ..............................................................................................18 1.2.3 The uncontrolled movement ...............................................................................................19 1.2.4 Sequence of events .................................................................................................................20 1.3 Site examination .......................................................................................................................................24 1.3.1 Inspection of rolling stock ....................................................................................................27 1.4 Weather ........................................................................................................................................................28 1.5 Subdivision information .........................................................................................................................28 1.6 Track information .....................................................................................................................................28 1.7 Personnel information ............................................................................................................................29 1.7.1 Inbound crew .............................................................................................................................29 1.7.2 Relief crew ...................................................................................................................................29 1.7.3 Trainmaster .................................................................................................................................30 1.8 Canadian Pacific’s grain car fleet ........................................................................................................30 1.8.1 Government of Canada fleet ...............................................................................................30 1.8.2 Canadian Pacific hopper cars ..............................................................................................31 1.8.3 Leased cars .................................................................................................................................31 1.8.4 Fleet composition of the occurrence train .....................................................................31 1.8.5 Renewal of Canadian Pacific’s grain car fleet................................................................32 1.9 Railway operations in winter ................................................................................................................32 1.9.1 Additional challenges in extreme cold temperatures ................................................33 1.9.2 Previous winter restrictions for westbound trains operating on Field Hill ........33 1.10 Field Hill operating procedures ..........................................................................................................34 1.11 Brake performance before the emergency stop ..........................................................................37 1.11.1 Locomotive event recorder data ........................................................................................37 1.11.2 Applied air flow events ..........................................................................................................38 1.11.3 Running brake test ..................................................................................................................38 1.11.4 Train handling on Field Hill before the emergency brake application ...............40 1.11.5 Emergency stop ........................................................................................................................41 1.12 Recovering from an emergency brake application on Field Hill ...........................................41 1.12.1 Emergency brake recovery procedure .............................................................................41 1.12.2 Methods for recovering from an emergency brake application ...........................42 1.12.3 Job briefing after the emergency stop ............................................................................45 1.13 Crew-to-crew transfer and delays......................................................................................................45 1.14 Train dynamics simulation ....................................................................................................................46 1.15 Brake retarding force calculations .....................................................................................................46 1.15.1 Brake retarding force required to maintain a constant speed ...............................47 1.15.2 Brake retarding force generated by the emergency brake application .............47 1.15.3 Brake retarding force required to hold the train stationary after the emergency stop ........................................................................................................................48
TRANSPORTATION SAFETY BOARD OF CANADA 4 1.16 Air brake system leakage ......................................................................................................................48 1.16.1 Detection of air leaks during brake tests ........................................................................49 1.16.2 Compensating for air brake system leakage .................................................................49 1.16.3 Effects of air leakage on brake application propagation .........................................52 1.17 Monitoring the brake pipe air flow ...................................................................................................57 1.17.1 Air flow measurements and brake system leakage ....................................................59 1.17.2 Air flow meter ............................................................................................................................62 1.17.3 Attention and information displays ..................................................................................63 1.18 Testing of the recovered cars ..............................................................................................................64 1.18.1 Outdoor testing ........................................................................................................................65 1.18.2 Shop-conducted testing ........................................................................................................71 1.19 Brake efficiency based on wheel data ..............................................................................................72 1.19.1 Wheel examination ..................................................................................................................72 1.19.2 Wheel temperature data .......................................................................................................75 1.19.3 Automated train brake effectiveness study ...................................................................80 1.20 Brake shoe friction fade .........................................................................................................................85 1.20.1 Friction fade on the train ......................................................................................................86 1.21 Car control valve malfunction in extreme cold temperatures ................................................90 1.21.1 Worn rubber seals....................................................................................................................90 1.21.2 DB-10 car control valves: Association of American Railroads circular letter ....91 1.21.3 Weeper port issues on DB-10 service portions ............................................................92 1.21.4 Examination of the train’s car control valves ................................................................93 1.21.5 Actions taken by the Association of American Railroads .........................................96 1.22 Comparison between the recovered cars and the derailed cars ...........................................97 1.22.1 Car control valves .....................................................................................................................98 1.22.2 Wheel temperature data .......................................................................................................98 1.23 Developments in freight train brake technology ...................................................................... 101 1.23.1 Automatic parking brakes ................................................................................................. 101 1.23.2 Brake cylinder maintaining feature ................................................................................ 104 1.23.3 Dynamic brake retention on distributed power remote locomotives.............. 105 1.23.4 Electronically controlled pneumatic brake system .................................................. 106 1.23.5 High-capacity fade-resistant brake shoes ................................................................... 108 1.24 Training ...................................................................................................................................................... 110 1.24.1 Requirements and regulations......................................................................................... 110 1.24.2 Canadian Pacific training program ................................................................................. 112 1.25 Coaching assessments and proficiency testing ......................................................................... 115 1.25.1 Coaching assessments ........................................................................................................ 116 1.25.2 Proficiency tests ..................................................................................................................... 116 1.26 Best practices in developing competence ................................................................................... 119 1.27 Previous recommendation concerning employee qualifications ....................................... 119 1.28 Crew resource management ............................................................................................................. 120 1.28.1 Crew resource management training in the rail industry ..................................... 120 1.28.2 Applied crew resource management ............................................................................ 122 1.29 Safety management systems ............................................................................................................ 124 1.29.1 Railway Safety Management Systems Regulations, 2015 ..................................... 125 1.29.2 Canadian Pacific’s safety management system ......................................................... 126 1.30 Regulatory oversight of railway operations ................................................................................ 132 1.30.1 Safety inspections conducted by the Prairie and Northern Region ................. 133
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 5 1.30.2 Audits of Canadian Pacific’s safety management system ..................................... 134 1.30.3 Previous recommendation concerning audits of the railway safety management system ........................................................................................................... 137 1.30.4 Regulatory oversight of occupational health and safety ...................................... 138 1.31 Safety culture .......................................................................................................................................... 139 1.31.1 Canadian Pacific’s safety culture ..................................................................................... 140 1.32 Similar occurrences ............................................................................................................................... 141 1.33 TSB statistics on occurrences involving unplanned or uncontrolled movements ....... 142 1.34 Previous recommendation and safety concern regarding uncontrolled movements 143 1.35 TSB Watchlist ........................................................................................................................................... 143 1.35.1 Unplanned/uncontrolled movement of railway equipment ................................ 143 1.35.2 Safety management ............................................................................................................. 144 1.35.3 Regulatory surveillance ....................................................................................................... 145 1.36 TSB laboratory reports......................................................................................................................... 145 2.0 Analysis ................................................................................................................. 146 2.1 Introduction ............................................................................................................................................. 146 2.2 The accident ............................................................................................................................................ 147 2.2.1 Before the emergency stop ............................................................................................... 147 2.2.2 While stopped in emergency ........................................................................................... 147 2.2.3 The uncontrolled movement ............................................................................................ 148 2.3 Training ...................................................................................................................................................... 148 2.3.1 Training of the inbound crew ........................................................................................... 149 2.3.2 Trainmaster training ............................................................................................................. 150 2.3.3 Training on crew resource management ..................................................................... 152 2.4 The emergency stop ............................................................................................................................. 153 2.4.1 Train handling before the emergency stop ................................................................ 153 2.4.2 Operators’ mental model of the train’s brake effectiveness ................................ 155 2.4.3 Braking degradation on the train ................................................................................... 158 2.5 The uncontrolled movement ............................................................................................................ 162 2.5.1 Decision making after the emergency stop................................................................ 162 2.5.2 Loss of retarding force while stopped on Field Hill ................................................. 167 2.5.3 Brake shoe friction fade ...................................................................................................... 168 2.5.4 Proportion of cars with ineffective braking ................................................................ 168 2.6 Effectiveness of required air brake tests to identify cars with defective brakes ........... 170 2.7 Developments in brake technology for freight trains ............................................................. 172 2.7.1 Automatic parking brakes ................................................................................................. 172 2.7.2 Brake cylinder maintaining feature ................................................................................ 173 2.7.3 Retention of dynamic brake force on remote locomotives ................................. 173 2.7.4 Electronically controlled pneumatic brake systems ................................................ 174 2.7.5 High-capacity fade-resistant brake shoes ................................................................... 175 2.7.6 Need for additional physical defences ......................................................................... 176 2.8 Canadian Pacific ..................................................................................................................................... 177 2.8.1 Coaching assessments and proficiency testing ........................................................ 177 2.8.2 Railway winter operating plan ......................................................................................... 178 2.8.3 Safety management system .............................................................................................. 179 2.8.4 Safety culture .......................................................................................................................... 183 2.9 Transport Canada .................................................................................................................................. 185
TRANSPORTATION SAFETY BOARD OF CANADA 6 2.9.1 Oversight of railway safety management systems .................................................. 185 2.9.2 Oversight of health and safety committee ................................................................. 186 2.9.3 Oversight of the training program ................................................................................. 186 3.0 Findings ................................................................................................................. 187 3.1 Findings as to causes and contributing factors ......................................................................... 187 3.2 Findings as to risk .................................................................................................................................. 189 3.3 Other findings ......................................................................................................................................... 191 4.0 Safety action ......................................................................................................... 193 4.1 Safety action taken ............................................................................................................................... 193 4.1.1 Transportation Safety Board of Canada ....................................................................... 193 4.1.2 Transport Canada .................................................................................................................. 195 4.1.3 Canadian Pacific ..................................................................................................................... 196 4.2 Safety action required ......................................................................................................................... 198 4.2.1 Reducing the risk of uncontrolled movements through the implementation of periodic maintenance requirements for brake cylinders ...................................... 199 4.2.2 Reducing the risk of uncontrolled movements through the implementation of automatic parking brake technology ............................................................................ 201 4.2.3 Risk management through hazard identification, data trend analysis, and risk assessments ............................................................................................................................. 205 Appendices..................................................................................................................... 209 Appendix A – Locomotive and freight car brakes ................................................................................. 209 Appendix B – Inspection and testing of air brake systems ............................................................... 217 Appendix C – Maintenance history of the cars on the occurrence train...................................... 220 Appendix D – Itemized list of train handling events ............................................................................ 222 Appendix E – Mechanical testing and human factors assessment of train securement using hand brakes ............................................................................................................................................. 228 Appendix F – Association of American Railroads Circular Letter C-12027 and New York Air Brake General Letter GL-490 ............................................................................................................. 236 Appendix G – Canadian Pacific bulletin CPSB048-13 .......................................................................... 240 Appendix H – TSB investigations involving crew resource management at railway companies ...................................................................................................................................................................... 241 Appendix I − TSB investigations related to hazard identification, data trend analysis, and risk assessments at Canadian Pacific ..................................................................................................... 243 Appendix J – Golder Associates audit of Canadian Pacific’s safety management system (CP internal audit) .......................................................................................................................................... 246 Appendix K – TSB investigations involving uncontrolled movements.......................................... 249 Glossary .......................................................................................................................... 253
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 UNCONTROLLED MOVEMENT OF ROLLING STOCK AND MAIN-TRACK TRAIN DERAILMENT Canadian Pacific Railway Company Freight train 301-349 Mile 130.6, Laggan Subdivision Yoho, British Columbia 04 February 2019 The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. This report is not created for use in the context of legal, disciplinary or other proceedings. See the Terms of use on page 2. EXECUTIVE SUMMARY On 04 February 2019, the Canadian Pacific Railway Company (CP) freight train 301-349 being operated by a relief crew derailed on Field Hill near Field, British Columbia, on a 13.5- mile section of track with a steep descending grade (average 2.2%) and several sharp curves. The 3 crew members—a locomotive engineer, a conductor, and a conductor trainee—were fatally injured in the derailment. The accident Before the emergency stop The unit grain train,1 hauling 112 loaded hopper cars, weighing 15 042 tons, and measuring 6676 feet long, had left Calgary, Alberta, at about 14302 the previous day, operated by an inbound crew3 consisting of a locomotive engineer and a conductor. It travelled west on the Laggan Subdivision, which runs from Calgary to Field. As the train progressed into the mountains, it encountered extreme cold temperatures (below −25 °C). The train started its descent of Field Hill at approximately 2136. When the entire train was on the steepest part of the grade, it was not able to hold its speed at or below the maximum 15-mph limit. When the speed reached 21 mph, the inbound crew applied the brakes in
1 A unit train is a train carrying a single commodity (in this case, grain) in cars of similar type, length, and weight. 2 All times are Mountain Standard Time, unless otherwise indicated. 3 The report refers to 2 separate train crews. The crew that operated the train from Alyth Yard in Calgary to Partridge is called the inbound crew, and the crew that took over control of the train at Partridge is called the relief crew.
TRANSPORTATION SAFETY BOARD OF CANADA 8 emergency, as required by railway operating procedures. At approximately 2149, the train came to a stop at Partridge, British Columbia (Mile 127.46). From there, about 9 miles of descending 2.2% grade remained ahead of the train. While stopped in emergency After the inbound crew brought the train to an emergency stop, they had a job briefing with the trainmaster. It was decided to get the train underway again by releasing the emergency brake application and allowing the train’s air brakes to recharge as the train continued its descent (an operation called release and catch). In order to limit the train’s acceleration after the brakes were released, the pressure retaining valves4 had to be set to the high- pressure position on 84 of the rail cars. The conductor completed this task at approximately 2330. Since the inbound crew was nearing the end of their shift, a relief crew was called in to complete the trip to Field. The relief crew started their shift at 2230 and reached the train— after a series of circumstances had delayed their arrival—at about 0020 on 04 February 2019, some 2.5 hours after the train had been stopped in emergency. Meanwhile, the ambient temperature had dropped to −28 °C, and the train’s air brake system had been leaking compressed air, reducing the brakes’ capacity to hold the train on the steep grade. The uncontrolled movement The relief crew took over care and control of the train and prepared to resume the trip, but waited in the locomotive cab for the track unit carrying the departing inbound crew to be clear of the main track before they began the release and catch. At 0042, before the relief crew were able to start that process, the train began to creep forward, gradually accelerating uncontrolled down the steep grade. The train was able to proceed over back-to-back reverse curves as its speed reached 53 mph, but it was not able to negotiate the sharp 9.8° curve immediately before the Kicking Horse River bridge. Two locomotives and 99 cars derailed, beginning at Mile 130.6. Safety deficiencies contributing to the accident The investigation identified a number of safety deficiencies that contributed to the accident: • The degradation of air brake systems in extreme cold temperatures • The limitations of current train brake test methodologies to accurately evaluate air brake performance in these temperatures • Training that was not specific to the unique operating conditions of the Laggan Subdivision, and the inadequacy of experience of employees supervising mountain- grade5 operations on this subdivision
4 A pressure retaining valve is a manually operated valve connected to the brake cylinder exhaust port. It can be used to limit the release of air pressure from the brake cylinder after the automatic brake is released. These valves can help prevent a train from accelerating too quickly downhill while the air brake system is recharging on the descent. 5 CP defines grades exceeding 1.8% as mountain grades.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 9 • The need for better identification of hazards through reporting, data trend analysis, and risk assessments under CP’s safety management system to support risk mitigation measures • The need for additional physical defences to prevent uncontrolled movement of rolling stock Air brake system degradation in extreme cold temperatures The leakage of compressed air from the train’s air brake system degraded the performance of the brakes in the extreme cold temperature. As a result, even though the inbound locomotive engineer had increased the amount of braking several times while going down Field Hill towards Partridge, the train’s speed continued to increase. When the speed reached 21 mph, the train crew applied the brakes in emergency. After the train stopped, the air brakes continued to leak over the next 3 hours until they could no longer hold the train. The investigation used several different methods to determine the effectiveness of the brakes at the time of the occurrence, most notably extensive testing of 13 cars recovered from the accident site; review of wheel temperature data for the cars on the train; brake retarding force calculations; and computerized train dynamics simulations. The results all indicated that on the descent of Field Hill before the emergency stop the brake effectiveness of the train was in the 60% to 62% range. After the train had been stationary on Field Hill for approximately 3 hours, the brake effort had degraded to less than 40% of the theoretical maximum braking effort. Several factors contributed to the degradation of the occurrence train’s braking performance, especially the leakage of compressed air from the air brake cylinders on the rail cars, which was aggravated by the extreme cold temperatures. If leakage is excessive, or interferes with the normal operation of air brake equipment, the brakes may not apply at all, may produce less than the expected amount of retarding force, or may release after a period of time. Limitations of current train brake test methodologies Most air brake issues can be detected when freight cars and locomotives are tested and inspected. The single car test is particularly relevant in this case: it verifies the intended operation of car brakes and ensures, among other things, that the brakes remain applied and do not exceed allowable leakage rates. Cars in service are required to undergo this test at least once every 5 years. The cars on the occurrence train met this requirement. Because this test is usually conducted in the warmer environment of a maintenance shop, it is very difficult to diagnose issues that reveal themselves only in extreme cold temperatures. Also, it cannot be used to evaluate the operation of the brakes on an entire train. One of the brake tests that an entire train undergoes is the No. 1 brake test, which is conducted by certified car inspectors when a train is assembled prior to departure. It verifies the brake pipe integrity and continuity, brake rigging condition, air brake application and release, and piston travel on each car in the train. The train cannot depart
TRANSPORTATION SAFETY BOARD OF CANADA 10 unless at least 95% of the train brakes are operative. The occurrence train passed a No. 1 brake test at Alyth Yard before departing Calgary at ambient temperatures of about −26 °C. By confirming that brakes apply and release, the No. 1 brake test can verify the responsiveness of an air brake system, but it cannot determine its effectiveness. In addition, because this test is done on a stationary train, it does not necessarily expose brake system defects that may materialize only while the train is in motion. Until train brake test methodologies accurately evaluate air brake effectiveness, trains operating in extreme cold temperatures may continue to have ineffective braking, increasing the risk of loss of control and derailment. Sufficiency of training The route through the Rocky Mountains on the Laggan Subdivision traverses some of the most challenging railway operating terrain in North America. Winter temperatures, ice, and snow compound these challenges—and present specific ones as well. Locomotive engineers Locomotive engineers have to be certified for the subdivision on which they operate trains. On the Laggan Subdivision, the certification requires about 3 extra months of training on Field Hill operations. This training includes trips to practise and achieve a qualification in descending the mountain grade and safely resuming operation of a train that is stopped on the grade. At the time of the occurrence, CP’s Field Hill certification program did not have a module on the particular challenges of operating a train on mountain grade in extreme cold conditions. This kind of training could make locomotive engineers more aware of the issues associated with air brake system operations in extreme cold and increase their vigilance when they encounter situations similar to those that arose in this occurrence. Conductors At the time of the occurrence, CP required conductors to do a classroom review of relevant operating procedures using job aids and track schematics in order to work on Field Hill. New hires also attended a 2-week classroom exercise in a simulated environment, where they operated as conductors applying all rules and operating instructions. However, there were no simulated trips specifically for Field Hill, and conductors were not required to be Field Hill–certified. If the classroom training does not address the unique needs of the territory where the employees will be working, and if the employees do not obtain the relevant on-the-job training on that territory, they will not be adequately prepared to perform their duties safely. Trainmasters After the emergency stop on Field Hill, CP operating instructions and procedures required the inbound crew to hold a job briefing with the trainmaster to determine the best course of action and follow the trainmaster’s instructions.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 11 Trainmasters overseeing train operations must have the technical expertise, knowledge, and experience to discuss options and provide solutions in complex operational situations, such as emergency brake recovery on a mountain grade. In this occurrence, the trainmaster had qualified as a locomotive engineer through the management training program, but he had not qualified on the Laggan Subdivision and so had never received the Field Hill training. The trainmaster’s effectiveness as a technical leader was likely weakened by the mismatch between his experience and the requirements of supervising mountain-grade operations on the Laggan Subdivision. Many railway companies in North America employ road foremen. This is also a supervisory role, but it focuses on the technical aspects of train operations (train handling, air brake operation, train dynamics, etc.). Road foremen are experienced locomotive engineers with considerable technical and operational expertise specific to the territory that they oversee. At the time of the occurrence, there was one road foreman at the Calgary terminal (the position had been vacant from 2016 to 2018), but his technical expertise and experience were similar to a trainmaster’s. Need for better hazard identification, data analysis, and risk assessment A safety management system (SMS) is an internationally recognized framework that allows companies to manage risk effectively and make operations safer. Risk assessments are a cornerstone of a fully functioning and effective SMS and are essential for a company to operate safely. The Railway Safety Management System Regulations, 2015 require railway companies to conduct risk assessments, including when a safety concern is identified. To identify safety concerns, railway companies are required to continually analyze their operations, current or emerging trends, and any recurring situations. The analyses use information such as employees’ reports of safety hazards and data from safety monitoring technologies. Safety hazard reports Safety hazard reports involving poorly braking unit grain trains descending Field Hill in cold winter temperatures had been submitted by train crews in January and February for a number of years. As individual notifications of this hazard were closed, new, similar reports continued to be recorded through the reporting system. Although CP’s procedure for safety hazard reporting was actively followed at the Calgary terminal, the trend analysis it required was not being done. Consequently, year after year, the reports on the poor braking of unit grain trains on Field Hill were closed, no formal risk assessment was conducted, and insufficient corrective action was taken. Data from wheel temperature detectors CP collects data from the wheel temperature detectors on its network. The work done by CP to use detectors to identify cars with brake system issues was novel in the industry when it began in 2008. These detectors make it possible to identify cars with cold wheels—cold wheels being an indicator of poor braking performance. The data collected in winter allow the railway to monitor the temperature sensitivity and performance of car air brakes when they are most susceptible to leakage.
TRANSPORTATION SAFETY BOARD OF CANADA 12 Wheel temperature detectors are a safety monitoring technology and, as such, data from them must be analyzed to identify safety concerns, trends or emerging trends, or recurring situations. However, at the time of the occurrence, CP did not analyze the data available for grain cars, and an opportunity was missed to identify the hazard and mitigate any risks related to the braking performance of grain trains in extreme cold temperatures. Risk assessments before operational changes Risk assessments must be conducted prior to implementing operational changes which have the potential to introduce new hazards or increase the level of severity of existing hazards. In the years preceding the occurrence, CP made incremental changes to the operating procedures for Field Hill, which included the speed threshold at which trains are permitted to descend Field Hill and the requirements for retainers and hand brakes after an emergency brake application. CP did not, however, do any risk analysis to assess how these changes would affect safety. Need for additional physical defences against uncontrolled movements This occurrence is one of 589 occurrences reported to the TSB from 2010 to 2019 that were related to unplanned and uncontrolled movements among all railways in Canada. Loss of control, as in this occurrence, was the causal category in 22 (4%) of them. While uncontrolled movements due to loss of control are low-frequency events, 59% of them (13 out of 22) affected the main track. Uncontrolled movements pose a significant risk to railway employees. When such movements involve the main track, the public—including passengers and people in the vicinity of the railway tracks—can also be exposed to risk. The risks increase significantly when a train carries dangerous goods. Consequently, these are considered low-frequency, high-risk events. The TSB remains concerned that the current defences are not sufficient to reduce the number of uncontrolled movements and improve safety. Unplanned/uncontrolled movements of railway equipment is on the TSB’s Watchlist 2020, which is a list of the key safety issues that need to be addressed to make Canada’s transportation system even safer. New technologies are available Many technological advancements are available to North American railways to enhance train brake performance, including automatic parking brakes, high-capacity fade-resistant brake shoes, control valves with a brake cylinder maintaining feature, and retention of dynamic brake force on remote locomotives. These technological enhancements are examples of physical defences that are likely to reduce the frequency of unplanned and uncontrolled movements of railway rolling stock. The major freight railways have been receptive to assessing these advancements, but have not fully implemented them. At the time of the occurrence, there were no regulatory requirements for their implementation.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 13 Safety action following the accident Transportation Safety Board of Canada Soon after the accident, the TSB communicated critical safety information6 on • the prevention of uncontrolled train movements for trains stopped in emergency on grades of less than 1.8% (TSB Rail Safety Advisory Letter 04/19, issued on 11 April 2019); • air brake system inspection and maintenance on grain hopper cars used in CP unit train operation (TSB Rail Safety Advisory Letter 05/19, issued on 11 April 2019); and • the effectiveness of the No. 1 brake test (TSB Rail Safety Advisory Letter 04/20, issued on 17 April 2020). Transport Canada For its part, Transport Canada introduced numerous initiatives, including a Ministerial Order requiring that trains stopped by an emergency brake application on a grade of 1.8% or greater immediately apply a sufficient number of hand brakes before recharging the air brake system. The Ministerial Order was later repealed when it was superseded by Rule 66 of the Canadian Rail Operating Rules. Transport Canada also approved the use of automated train brake effectiveness technology in lieu of No. 1 brake tests on CP’s unit grain trains operating between points in Western Canada and the Port of Vancouver. Canadian Pacific For its part, CP • revised the train handling procedures for the Laggan Subdivision with respect to the use of retainers and hand brakes before recovering from an emergency brake application on mountain grades; • issued Operating Bulletin OPER-AB-015-19, which introduced both new cold- weather speed restrictions for Field Hill for trains with a weight per operative brake of 100 tons or greater and a requirement that undesired releases of brakes on Field Hill be reported immediately to the rail traffic controller; • monitored wheel temperatures on all westbound grain trains passing by detectors installed on the Laggan and the Mountain subdivisions, which resulted in more than 5000 grain cars being removed from service for repair; • developed an advanced training program for locomotive engineers to build their skills and readiness for dealing with adverse conditions in the field. Adverse conditions covered by the training program included response to minor and major changes in air flow and brake pipe fluctuation, response to an undesired release of the air brakes, and procedures for emergency air brake recovery.
6 These safety advisory letters are available at https://www.tsb.gc.ca/eng/securite-safety/rail/index.html
TRANSPORTATION SAFETY BOARD OF CANADA 14 TSB recommendations To address the systemic safety issues that posed a significant risk in this occurrence, the Board made 3 recommendations, namely • that the Department of Transport establish enhanced test standards and requirements for time-based maintenance of brake cylinders on freight cars operating on steep descending grades in cold ambient temperatures (TSB Recommendation R22-01); • that the Department of Transport require Canadian freight railways to develop and implement a schedule for the installation of automatic parking brakes on freight cars, prioritizing the retrofit of cars used in bulk commodity unit trains in mountain grade territory (TSB Recommendation R22-02); and • that the Department of Transport require Canadian Pacific Railway Company to demonstrate that its safety management system can effectively identify hazards arising from operations using all available information, including employee hazard reports and data trends; assess the associated risks; and implement mitigation measures and validate that they are effective (TSB Recommendation R22-03).
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 15 RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 UNCONTROLLED MOVEMENT OF ROLLING STOCK AND MAIN-TRACK TRAIN DERAILMENT Canadian Pacific Railway Company Freight train 301-349 Mile 130.6, Laggan Subdivision Yoho, British Columbia 04 February 2019 The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. This report is not created for use in the context of legal, disciplinary or other proceedings. See the Terms of use on page 2. 1.0 FACTUAL INFORMATION 1.1 The territory On 03 February 2019, Canadian Pacific Railway Company (Canadian Pacific or CP) freight train 301-349 was travelling westward on the Laggan Subdivision, which runs from Calgary, Alberta (Mile 0.0) to Field, British Columbia (BC) (Mile 136.6). The Laggan Subdivision is part of CP's main corridor to the west coast. It is one of several subdivisions through the Rocky and Cascade mountains characterized by steep grades and sharp curves. This route traverses some of the most challenging railway operating terrain in North America and is subject to environmental conditions that include extreme heat and cold, avalanches, rock slides, and slope destabilizations during spring runoff. The route from Calgary to Stephen, BC (Mile 123.1), consists of a long gradual climb, followed by a steep descent at Field Hill. The section of the Laggan Subdivision known as Field Hill runs 13.5 miles from Stephen to Field. It is designated as mountain grade7 and drops from an elevation of 5290 feet at Stephen to 4045 feet at Field. The descending grade varies between 1.7% and 2.2%. The track through Field Hill goes through several tunnels and crosses the Kicking Horse River at Mile 130.6 between 2 spiral tunnels. The Upper Spiral Tunnel is 3255 feet long and extends from Mile 128.8 to Mile 129.5. The Lower Spiral Tunnel is 2922 feet long and extends from Mile 131.0 to Mile 131.5.
7 CP defines heavy grades as grades from 1.0% to 1.8%. Grades exceeding 1.8% are defined as mountain grades.
TRANSPORTATION SAFETY BOARD OF CANADA 16 There are several sharp curves ranging from 8° to 10°, including back-to-back reverse curves. At Mile 130.2, the track has an 8.4° left-hand curve followed by a 7.9° right-hand curve; then, approaching the Kicking Horse River bridge, the curvature changes to a 9.8° left-hand curve. In this occurrence, the train stopped in emergency at Partridge, BC (Mile 127.46). A few hours later, it started to roll on its own, uncontrolled. The head-end portion of the train derailed at Mile 130.6 (figures 1 and 2). Figure 1. Map showing the occurrence location, with inset map showing the locations of the emergency stop and the subsequent derailment (Source: Railway Association of Canada, Canadian Rail Atlas, with TSB annotations)
Figure 2. Track gradients on Field Hill and location of the train stopped in emergency (Source: TSB)
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 17 1.2 The accident A summary of relevant events for this occurrence is provided in Table 1. A detailed timeline of the events that took place from the time the train stopped in emergency until it began to roll uncontrolled can be found in Table 2. Both of these tables are in section 1.2.4. A description of locomotive and freight car brakes is provided in Appendix A. Information on inspection and testing of air brake systems is provided in Appendix B. 1.2.1 Before the emergency stop On the morning before the occurrence, a CP train crew (the inbound crew)8 was called at 10309 to report at Alyth Yard in Calgary for 1230. The crew was scheduled to operate freight train 301-349 westward on the Laggan Subdivision. The train was a unit train10 hauling 112 loaded grain hopper cars. It weighed 15 042 tons and was 6676 feet long. It was powered by 3 distributed power (DP) locomotives— 1 positioned at the head end, 1 in a mid-train position, and 1 on the tail end. The mid-train and tail-end locomotives were remote-controlled.11 Earlier in the day at around 1210, the train had arrived at Alyth Yard with 1 car cut out (line 101, CP 603181).12 Prior to departure from Alyth Yard, the train underwent a No. 1 brake test.13 The test identified defective brakes on 1 more car (line 27, CP 607409), which was also cut out. With the 2 cars cut out, the train was cleared to leave, about 60 minutes later than expected. With the brake systems on 2 of the 112 cars cut out, the train had 98% of its car brakes operative with a weight of 131.1 tons per operative brake.
8 The report refers to 2 separate train crews. Where there is a risk of confusion, the crew that operated the train from Alyth Yard in Calgary to Partridge is referred to as the inbound crew, and the crew that took over control of the train at Partridge and was on board the train at the time of the derailment is referred to as the relief crew. 9 All times are Mountain Standard Time, unless otherwise indicated. 10 A unit train is a train carrying a single commodity (in this case, grain) in cars of similar type, length, and weight. 11 The remote locomotives, upon receipt of a distributed power (DP) radio message, respond by executing the train handling commands they receive. When the train is operating in DP synchronous mode, as in this occurrence, the signals sent by the lead locomotive ensure synchronous operation between the locomotives distributed throughout the train. 12 A car is cut out by turning the branch pipe cutout cock to the off position and operating the bleed rod to release air pressure from the brake cylinder, rendering the brakes of the car inoperative. See Figure A1 in Appendix A – Locomotive and freight car brakes. 13 A No. 1 brake test, conducted by a certified car inspector, verifies brake pipe integrity and continuity, brake rigging condition, air brake application and release, and piston travel on each car. After completing a No. 1 brake test, a train may depart from a safety inspection location with 95% of the train brakes operative.
TRANSPORTATION SAFETY BOARD OF CANADA 18 The train departed Alyth Yard at approximately 1430. It was operating in extreme cold temperature; when it passed Mile 65.6, a wayside hot box detector14 alerted the crew that the ambient temperature was −27 °C. En route, the crew members experienced several delays in their progress westward with reduced speed due to low ambient temperatures, switch malfunctions, and train meets that added to their trip time. The locomotive engineer (LE) noticed increases in air flow whenever he applied the air brakes along the route,15 but the air brake system performed as expected. At approximately 2136, the train began proceeding down the steep grade that starts at Mile 125.6. The train could not maintain a speed below the maximum allowable limit of 15 mph; as the speed reached 21 mph, the crew applied the brakes in emergency and the train came to a stop at Partridge at around 2149. From the train’s stop location, about 9 miles of descending 2.2% grade still remained ahead of the train before the grade would decrease to between 0.5% and 0.4% for about 9000 feet starting at Field. 1.2.2 While stopped in emergency At 2215, about 25 minutes after the train was stopped with an emergency brake application, the inbound crew and the trainmaster performed the required job briefing to assess the situation and determine the best course of action for recovering16 the emergency brake application. It was decided that the conductor would set the retaining valves (retainers)17 to the high pressure (HP) position on 75% of the cars (84 cars), as required in the Field Hill operating procedures (FHOP), to facilitate a release and catch operation.18 Because the inbound crew were close to the 10-hour limit of service in their collective agreement, the rail traffic control (RTC) director ordered a relief crew, who would take over control of the train and complete the trip to Field.
14 A hot box detector is a wayside detector which measures both bearing and wheel temperatures. The detector also provides ambient temperature to the train crew via a radio communication after the entire train has passed by the detector. 15 A rise in air flow when the air brakes are applied is referred to as “applied air flow” and is a leading indicator of brake system malfunction. The locomotive engineer (LE) informed the trainmaster of the observed applied air flow events later during a job briefing after the emergency stop. 16 “Recovering” refers to releasing the emergency brake application and recharging the train’s air brakes. This process is initiated by moving the automatic brake valve handle out of the emergency position and placing it in the release position, thus resetting the pneumatic control switch and restoring all locomotive tractive effort and dynamic brake (DB). 17 A retaining valve, commonly called a retainer, is a manually operated valve that is used to limit the release of air pressure from the brake cylinder. For more information, see Appendix A – Locomotive and freight car brakes. 18 “Release and catch” is a term used to describe the operation of recovering an emergency brake application on a descending grade; it involves releasing the emergency brake application and allowing the train’s air brakes to recharge as the train continues its descent. The intent is for retained brake cylinder pressure (BCP) and available locomotive DBs to slow the acceleration of the train until the air brake system is sufficiently recharged for re-application of the air brakes.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 19 The members of the relief crew—an LE, a conductor, and a conductor trainee—were not immediately available; they were scheduled to come on duty at 2230. They had originally been ordered at Field to relieve another train and, at that time, the relief LE had opted to take a 2-hour advance call19 (in accordance with his collective agreement) before coming on duty. Once en route, they travelled to Yoho by road vehicle, then were required to make the remainder of the trip to Partridge in a snow removal track unit. At Yoho, the relief LE had a face-to-face job briefing with the trainmaster, who informed him of the decision to apply retainers on 84 of the train’s cars to assist in the safe recovery from the emergency brake application. Departing Yoho, the relief crew was further delayed as it was necessary to clear snow from a switch that led onto the main track. While waiting for the relief crew to arrive, the inbound conductor set the required retainers on 84 (75%) of the cars, as decided. The task, which was made more difficult by the mountainous terrain, the extreme cold, and the darkness, took approximately 1 hour. The conductor returned to the locomotive at approximately 2330. The relief crew arrived at Partridge at 0005 on 04 February 2019, and reached the train at 0020, approximately 2.5 hours after it had stopped in emergency. 1.2.3 The uncontrolled movement Upon taking control of the train, the members of the relief crew had a job briefing with the inbound crew in the lead locomotive, and no concerns were raised. The relief crew then waited, as the train could not proceed down the hill until a track occupancy permit was cancelled,20 which required the snow removal track unit transporting the inbound crew to be clear of the Yoho east switch. The LE stated in conversation with the RTC that he would not recover the emergency brake application until it had been confirmed to him that the track ahead was not occupied. At 0042, while the relief crew was still waiting, the train started to roll on its own and the LE made an emergency radio broadcast. The engineering personnel on the main track overheard the transmissions and responded that they would indicate when they were in the clear at Yoho. The RTC repeated the emergency call a number of times to warn the engineering personnel on the main track to get clear of the track as soon as possible. The LE also asked the RTC to clear trains from the main track at Field, which was done, and to evacuate the Field bunkhouse. When the train began its uncontrolled movement, the conductor and the conductor trainee left the locomotive cab with the intent to apply hand brakes to stop or slow the train; however, the train continued to accelerate and the LE told both crew members to return to
19 The collective agreement between the railway and LEs permits advance notification calls to report for duty at the away-from-home terminal to be varied in duration, up to a maximum of 2 hours. 20 Track occupancy permits are issued by the rail traffic controller to a foreman to provide authority to occupy the main track or to perform track work. Such permits are often used to protect track unit movements on the main track and remain in effect until cancelled by the foreman in charge.
TRANSPORTATION SAFETY BOARD OF CANADA 20 the locomotive cab for their safety. They did not have an opportunity to apply any hand brakes. After the train was in motion, it accelerated rapidly and so it was not feasible to recover the emergency brake application.21 Once the train entered the sharp curves on the descent, the LE broadcast that he expected the curve resistance to slow the acceleration of the uncontrolled movement and the train to “stall out” in the tunnel. The train was able to proceed over back-to-back reverse curves as its speed gradually accelerated to about 53 mph, well in excess of the maximum authorized speed; however, it was not able to negotiate the sharp 9.8° curve immediately before the Kicking Horse River bridge. The head end of the train derailed at Mile 130.6, at 0051. The 3 crew members were fatally injured. 1.2.4 Sequence of events The sequence of events was established from a review of available information, including radio communication records, data from the locomotive event recorders (LERs), and interviews (Table 1). Table 1. Sequence of events in the occurrence Note: Times where seconds are expressed as 00 are approximate; other times are exact, unless otherwise specified. Date Time Event 2019-02-03 1230:00 The inbound crew is ordered to Alyth Yard for train 301-349. 2019-02-03 1415:00 The train completes a No. 1 brake test and an inspection at Alyth Yard. 2019-02-03 1430:00 The train departs Alyth Yard with 2 cars cut out: CP 603181 (line 101) and CP 607409 (line 27). 2019-02-03 1436:00 The crew members remind the RTC that they need to be off duty by their 10th hour, at 2230, in accordance with their collective agreement. 2019-02-03 1506:00 The LE observes an applied air flow event while bringing the train to a stop at Keith, Alberta, for a meet. 2019-02-03 1510:00 The train receives a roll-by inspection with nothing noted while coming to a stop at Keith to meet 3 trains. 2019-02-03 1519:00 The RTC informs the crew about a problem with the west switch at Keith. 2019-02-03 1639:00 The RTC contacts the crew and asks for a 10 psi brake application and release to address a warm wheel detected on the car in position number 107 (DME 51034). 2019-02-03 1720:00 The LE informs the RTC that the train’s speed is now restricted to a maximum of 25 mph through Canmore, Alberta, and Banff, Alberta, after the wayside detector at Mile 65.6 broadcasted a −27 °C cold temperature alert on the standby channel.
21 Had the LE successfully recovered the emergency brake application during the uncontrolled descent, which is an extraordinary measure that does not follow the railway operating procedures, dynamic braking effort would have been re-enabled on the 2 remote locomotives within several minutes. However, this would have resulted in the temporary loss of the braking capacity provided by the emergency brake application while the air brake system was recharging. The train, therefore, would have accelerated with only the retarding force of the DBs on the 3 locomotives, in combination with whatever residual BCP was being provided by the 84 cars with retainers set.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 21 Date Time Event 2019-02-03 1805:00 The LE observes an applied air flow event while bringing the train to a stop at Banff to meet a train. 2019-02-03 1838:00 The RTC informs the crew of impending delays at Eldon, Alberta, to meet other trains, and for weather and switch problems. 2019-02-03 1909:00 The LE observes an applied air flow event while bringing the train to a stop at Eldon to meet 2 trains. 2019-02-03 1910:00 The train receives a roll-by inspection with nothing noted while coming to a stop at Eldon for meets. 2019-02-03 2014:00 The train departs Eldon siding. The RTC relieves the crew of inspecting duties for their train at the end of their tour of duty at Field. 2019-02-03 2125:00 The LE starts to advance the throttle from notch 1 to the notch 2-3 position at a speed of 2 mph to keep the train moving on the approach to Stephen. 2019-02-03 2128:13 The LE makes an initial air brake application at Mile 123.12 while starting down the grade at Stephen. 2019-02-03 2128:37 The LE observes an applied air flow event. 2019-02-03 2136:45 While descending Field Hill, the LE makes the first of several incremental brake pipe pressure reductions as the train speed continues to increase. 2019-02-03 2137:15 The LE observes an applied air flow event after he makes the first incremental brake pipe pressure reduction. 2019-02-03 2148:08 The LE and the conductor apply the train brakes in emergency as the speed reaches 21 mph. 2019-02-03 21:48:25 The LE makes an emergency broadcast on the radio. 2019-02-03 2149:33 The train comes to a stop with the head end located at Mile 127.46. 2019-02-03 2153:00 The RTC asks the crew if the air is coming back, after the brakes were applied in emergency. The crew responds that they need to hold a job briefing with the trainmaster to determine what to do next. 2019-02-03 2215:00 The trainmaster and the crew conduct a job briefing over the radio. During the discussion, the LE mentions the applied air flow events that he observed along the way. A decision is made to set retainers on 75% of the cars (84 cars) per the Field Hill operating procedures. 2019-02-03 2230:00 The trainmaster arrives at Yoho by road vehicle. The RTC director informs the trainmaster that the relief crew will be on their way to Yoho shortly by road vehicle. The track foreman starts preparing a snow removal track unit to transport the relief crew by rail from Yoho to the train. The conductor exits the cab of the locomotive and begins setting the retainers. 2019-02-03 2245:00* The relief crew arrives at Yoho by road vehicle. 2019-02-03 2315:00 The track foreman, to prepare the way for the snow removal track unit, attempts to line the switch from the storage track onto the main track, but the switch is fouled with frozen snow. 2019-02-03 2330:00 The conductor returns to the locomotive cab after setting 84 retainers. 2019-02-03 2335:00 While waiting in Yoho, the relief LE holds an in-person briefing with the trainmaster. The decision to use retainers on 75% of the cars is discussed, and the relief LE does not object. While the relief LE is with the trainmaster, they also have a briefing via radio with the inbound LE. 2019-02-04 0015:00 The snow removal track unit departs Yoho and travels on the main track to transport the relief crew to the train. 2019-02-04 0031:00 The relief crew reports to the RTC that they are now on board the train.
TRANSPORTATION SAFETY BOARD OF CANADA 22 Date Time Event 2019-02-04 0042:02 The train starts to roll on its own with the emergency brake application still engaged. 2019-02-04 0042:36 The conductor and the conductor trainee get off the train to apply hand brakes. 2019-02-04 0042:38* The LE broadcasts over the radio that the train is in emergency and travelling at 1 mph. 2019-02-04 0042:40* The LE tells the conductor and the conductor trainee to return to the cab. 2019-02-04 0048:30 The train, now travelling at 22 mph, passes the Partridge west signal, which is displaying a stop indication protecting the block ahead with a track occupancy permit still in effect between Partridge and Yoho. 2019-02-04 0048:30 The inbound crew aboard the snow removal track unit moves clear of the Yoho east switch. 2019-02-04 0048:32 The Yoho east switch is manually lined in the normal position, and the track foreman reports this to the RTC. 2019-02-04 0049:00 The train passes the Yoho east switch. 2019-02-04 0049:10 The LE broadcasts that the train is entering Upper Spiral Tunnel and that its speed is 40 mph. 2019-02-04 0050:05 The LE broadcasts that the speed of the train is 48 mph. 2019-02-04 0050:20 The LE broadcasts that the speed of the train is 51 mph. 2019-02-04 0050:27 The tail end portion of the train separates between positions 85 and 86. 2019-02-04 0050:31 The midsection of the train separates between positions 36 and 37. 2019-02-04 0050:34 The tail-end remote locomotive comes to a stop just inside the west portal of the Upper Spiral Tunnel. 2019-02-04 0050:54* The head end of the train derails in the Kicking Horse River. 2019-02-04 0051:20 The wayside detector broadcasts an alert after the train passes Mile 130.2 that the power is off and not working, and also provides a car count with fewer cars than are actually on the train. * Estimated time based on the surviving LER data obtained from the DP mid-train and rear locomotives. After the train had stopped in emergency on the mountain grade at Mile 127.46, approximately 2.5 hours elapsed before the relief crew was on board and preparing to recover the emergency brake application. Table 2 describes the activities that took place and the delays incurred during the 3 hours that the train remained stationary on Field Hill.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 23 Table 2. Timeline of the events and delays while the train was stationary on Field Hill Date Time Elapsed time Events 2019-02-03 2150 00:00:00 • The inbound crew applies the train brakes in emergency at Mile 126.98. • The train stops at Mile 127.46. • The inbound crew makes an emergency broadcast on the standby channel and contacts the RTC. • The trainmaster hears the emergency broadcast while in his vehicle at Field. 2019-02-03 2153 00:03:00 • The RTC contacts the inbound crew and requests an update. • The LE indicates that he needs to talk to the trainmaster to have a job briefing before doing anything. • The trainmaster is unable to contact the inbound crew from Field. • The RTC director recognizes the implications related to the time required to apply retainers, recover the emergency brake application, and get the train down to Field. • The train crew originally planned to relieve train 101 is reassigned by the director to relieve train 301 instead. 2019-02-03 2215 00:25:00 • The trainmaster, en route to Yoho, contacts the inbound crew for a job briefing. • The job briefing takes place, during which a decision is made to apply retainers on 75% of the cars (84 cars), as per policy. • The trainmaster assesses that the inbound crew can recover the emergency brake application and bring the train to Field. • The trainmaster tells the crew that he will drive to Yoho to be on hand to assist if necessary. 2019-02-03 2230 00:40:00 • The trainmaster arrives at Yoho by road vehicle. • The track foreman starts preparing a snow removal track unit to transport the relief crew by rail from Yoho to the train. • The RTC director informs the trainmaster that the relief crew will be on their way to Yoho shortly by road vehicle. • The conductor exits the cab of the locomotive and begins setting the retainers. 2019-02-03 2245 00:55:00 • The relief crew arrives at Yoho by road vehicle. 2019-02-03 2253 01:03:00 • The RTC contacts the inbound crew for an update. • The LE indicates that the conductor still has 60 retainers to set. 2019-02-03 2315 01:15:00 • The relief crew is delayed at Yoho while the snow removal track unit is readied and frozen snow is cleaned out of a track switch. 2019-02-03 2327 01:37:00 • The RTC contacts the inbound crew for an update. • The LE indicates that the conductor still has 5 retainers to set. • The LE informs the RTC that the relief crew has not yet arrived at the train. 2019-02-04 0015 02:25:00 • The snow removal track unit departs Yoho and travels by rail to transport the relief crew to the train. 2019-02-04 0020 02:30:00 • The relief crew arrives at the train and conducts a job briefing with the inbound crew.
TRANSPORTATION SAFETY BOARD OF CANADA 24 Date Time Elapsed time Events 2019-02-04 0031 02:41:00 • The relief LE contacts the RTC to inform him that they are on board the train. • The relief LE indicates to the RTC that the train is waiting to be contacted by the track foreman for confirmation that the snow removal track unit and all on-board personnel are clear of the main track. • The LE mentions that, after the track foreman provides the “all-clear” confirmation, the emergency brake application will need to be recovered before the train can proceed to Field. 2019-02-04 0042 02:52:00 • The train starts to roll on its own. • The relief crew makes an emergency broadcast on the standby channel. • The RTC contacts the relief crew in response to emergency broadcast. • The relief LE informs the RTC that the train has started to roll on its own even though the emergency brake application has not been recovered. 1.3 Site examination The derailment site spanned 1.2 miles, from Mile 129.4 to Mile 130.6. It was located about 6.8 track miles northeast of the town of Field. The train had separated into 3 sections during the derailment (Figure 3). Figure 3. Site diagram showing an overview of the derailment site and close-up views of the 3 sections of the derailment (Source: TSB) The front portion of the train, including the lead locomotive (CP 9538) and the first 35 cars, had derailed on the curve immediately before the Kicking Horse River bridge at Mile 130.6 (Figure 4).
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 25 Figure 4. Derailed head-end cars looking toward the rear of the train (Source: Canadian Pacific) The head-end locomotive, CP 9538, was lying on its left side in the riverbed, some 35 feet below the track level. The river was quite shallow, and the surface was frozen and covered with snow. A patch of open water about 20 feet in diameter was visible underneath and adjacent to the locomotive, where the ice had broken when the locomotive fell onto the riverbed. An inspection of the underside of the locomotive showed little indication of ground contact, but the rest of the locomotive had sustained extensive damage. Several derailed cars were lying on the river embankment, and the remaining cars in this section of the occurrence site had derailed along the right-of-way. The head-end cars had been scattered on the embankment or had come to rest in the treed area some distance away from the track. Further back in the train, at around Mile 130.2, 40 cars from the middle portion of the train had derailed on their side and in a pile-up. Several of these cars were underneath a multi-lane overpass structure where Highway 1 passes above the track. Some cars were leaning against the bridge piers, which sustained superficial damage (Figure 5). Figure 5. Cars under the Highway 1 overpass (Source: TSB)
TRANSPORTATION SAFETY BOARD OF CANADA 26 The mid-train remote locomotive, UP 5359, had derailed but stood upright among other cars stacked in a side-by-side pile-up (Figure 6). Figure 6. Mid-train distributed power remote locomotive, UP 5359 (Source: TSB)
Eight cars on the trailing end of the middle portion did not derail and were not damaged. In the rear portion, rolling stock was located both inside and outside the Upper Spiral Tunnel. Outside the tunnel, 7 cars were derailed on their side and 15 cars were derailed in a pile-up on the mountainside. Inside the tunnel, 4 cars had stayed on the rails, 1 car had the rear truck derailed, and 2 cars were upright with all trucks derailed. The tail-end remote locomotive, CEFX 1040, remained on the track some 475 feet inside the tunnel (Figure 7). Figure 7. Tail-end cars derailed outside the Upper Spiral Tunnel (Source: Canadian Pacific)
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 27 The track examination did not show any breaks or gaps in the rail, or any indication of lateral shift. The rail was still solidly anchored to the hardwood crossties. The track structure was solidly frozen in the ground. There was no indication that the high rail (outer side of the curve) had canted outward or rolled over. 1.3.1 Inspection of rolling stock Access to the rolling stock was limited in many areas due to the wreckage, spilled car contents, and confined workspace. In many cases, key components of interest were damaged beyond the point at which meaningful information could be obtained. The inspection focused on the visible portions of the rolling stock, in particular the brake system, the wheelsets, and the position of the various valve handles on the cars. All of these could provide insight into the operation of the train at the time of the occurrence. The car air brake system appeared to be properly set up. The retainer handles that were visible appeared to be in the HP position. The examination of the hand brakes did not provide any indication that they had been applied. The brake rigging and wheel tread surfaces were all relatively clean and with no evidence of snow or ice buildup. The head-end locomotive was extensively damaged; a section of the control stand with various control levers was removed for visual inspection off site. This inspection indicated that the controls were operational and had not malfunctioned in any way before the locomotive derailed. The electrical wiring was intact, as were the controller mechanical linkages. The following components were set aside for further examination and testing: • the 12 grain cars that had not derailed, plus the grain car that remained upright with 1 truck derailed; • the tail-end locomotive; • the brake shoes on all 3 locomotives (Figure 8); and • the car wheelsets that could be recovered, about 78% of the total wheels (Figure 9). Figure 8. Twelve of the recovered locomotive brake shoes (Source: TSB) Figure 9. Recovered car wheelsets (Source: TSB)
TRANSPORTATION SAFETY BOARD OF CANADA 28 1.4 Weather At the time of the occurrence, the sky was clear with light gusting winds. Although it had recently snowed in the area, the snow was not covering the top of the rail head. The ambient temperature was determined to be about −25 °C when the train stopped in emergency. By the time the train started to roll on its own around 0042, the temperature had decreased to −28 °C. 1.5 Subdivision information The Laggan Subdivision is part of CP's main corridor to the west coast. The subdivision extends from Calgary (Mile 0.0) to Field (Mile 136.6), and consists primarily of a single main track, with a double-track portion located between Lake Louise, Alberta (Mile 116.2), and Stephen (Mile 123.1). At Field, the track connects with Mile 0.0 of the Mountain Subdivision. Train movements are governed by the centralized traffic control (CTC) system, as authorized by the Canadian Rail Operating Rules (CROR), and dispatched by an RTC located in Calgary. Calgary is also the home terminal for train crews, trainmasters and road foremen operating on the Laggan Subdivision. Laggan Subdivision freight traffic volumes for 2015–2019 are shown in Table 3. Table 3. Freight traffic volumes on the Laggan Subdivision from 2015 to 2019 (Source: Canadian Pacific) Year Volume (million gross ton- miles per mile) 2015 62.8 2016 65.3 2017 65.9 2018 70.6 2019 70.1 1.6 Track information In the vicinity of the derailment, the main track consisted of 136-pound continuous welded rail manufactured in 2000. On the open track, the rail was laid on 14-inch double- shouldered tie plates and was fastened to hardwood ties with 3 spikes per tie plate. Inside the spiral tunnels, the rail was secured to steel ties using spring clips. The ballast was clean crushed rock. The shoulders were about 12 inches wide, the cribs were full, and the drainage was good. The track is normally inspected a minimum of twice per week as required by CP’s Red Book of Track & Structures Requirements. The last regulatory track inspection, conducted as required by the Transport Canada (TC)–approved Rules Respecting Track Safety, was conducted on 31 January 2019. There were no deficiencies noted during the inspection near the derailment location.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 29 From Mile 122.9 to Mile 136.6, the maximum authorized speed on this track is 20 mph. Freight trains having a weight per operative brake of 100 tons or more are restricted to a maximum authorized speed of 15 mph. 1.7 Personnel information 1.7.1 Inbound crew The inbound crew was composed of an LE and a conductor. Both crew members met established rest and fitness requirements and were qualified for their respective positions. The LE was hired as a conductor trainee in November 2005. He qualified as a conductor in May 2006. He spent 5 years on yard assignments and then moved to road service. He entered the LE training program in January 2012 and qualified in August 2012. After qualification, he returned to his previous position as a conductor and worked as a relieving LE on various subdivisions when an assignment was available. In 2018, he moved permanently to the LE spare board for the Laggan Subdivision. He had followed the program specifically designed for Field Hill operations and was Field Hill–certified.22 The conductor started training as a conductor in April 2018 and qualified at the end of August 2018. After qualifying, she worked on yard assignments in Alyth Yard and in the Carseland Cargill facility and on road switching assignments. The occurrence trip was her 4th trip working as a conductor on the Laggan Subdivision. 1.7.2 Relief crew The relief crew consisted of an LE, a conductor, and a conductor in training (the conductor trainee). The relief LE qualified in 1996, resigned in 2002, and was rehired as a conductor/LE in 2003. This was his 1268th trip on the Laggan Subdivision. The relief conductor qualified in 2007 and was on his 171st trip on the Laggan Subdivision. The conductor trainee was hired in 2018 and was taking his 13th training trip on the Laggan Subdivision. The relief crew members had arrived at Field in a westbound train on the morning of 03 February 2019. They went off duty at 1120 and had more than 8 continuous hours off- duty time, in accordance with established rest and fitness requirements. However, from the early morning hours of 03 February 2019 until 2200, a power outage affected heating and electrical power at the CP’s bunkhouse in Field, where the relief crew was resting. The power outage also resulted in a loss of communications, meaning that crews had to be notified by supervisors, in person, when called to duty. In addition, the generator in Field ran out of fuel, and the occupants of the bunkhouse resorted to using the propane-fuelled cooking stove as a heat source. The temperature inside the bunkhouse facility had reportedly dropped to as low as 8 °C before power was restored.
22 More information on Field Hill certification and training is provided in section 1.24.2.4.
TRANSPORTATION SAFETY BOARD OF CANADA 30 1.7.3 Trainmaster The trainmaster joined CP in 2008 as an RTC where he gained preliminary experience dispatching the Laggan Subdivision during his first year of service. He qualified as a conductor in 2013 and as an LE in 2015 under management training programs,23 and became a trainmaster in January 2016. At the time of the occurrence, he had taken over 100 trips as an LE, most of them on mountainous territory on the Cranbrook and Windermere subdivisions, and had worked on the Laggan Subdivision as a conductor. The trainmaster was not a Field Hill–certified LE, nor was it a CP requirement for supervisors on that territory. 1.8 Canadian Pacific’s grain car fleet The 112 grain cars on the train were assembled from 3 separate fleets of hopper cars: a fleet owned by the Government of Canada, CP’s own fleet, and a fleet of leased cars. 1.8.1 Government of Canada fleet From 1972 to 1994, the Government of Canada purchased some 13 500 covered hopper cars to carry Western Canadian grain for export (Figure 10). Many of these cars have been removed from service by attrition, but, at the time of the occurrence, more than half of them were still in service and represented approximately one third of the cars in active grain service in Canada. At the end of December 2018, the Government of Canada’s grain hopper car fleet consisted of 7749 cars, almost evenly distributed between CP and Canadian National Railway Company (CN). In 2007, the Government of Canada signed an agreement with CN and CP for the operation, maintenance, and refurbishment of the federal fleet of hopper cars.24 CP is required by agreement to maintain capacity for the transportation of grain by refurbishing the Government of Canada fleet of hopper cars, upgrading cars to carry higher loads, and replacing some of the retired cars with new higher-capacity hopper cars. Like any other commodity freight car, the grain hopper cars require repairs. TC monitors the number of bad-order cars to ensure that efficient and timely maintenance is done, consistent with the Association of American Railroads (AAR) Field Manual of the AAR Interchange Rules.
23 The primary difference in the management training for LEs was that for management employees, there was no prerequisite regarding the number of years of experience as a conductor. For full-time unionized conductors, a minimum of 2 years was required before training as an LE could start. CP maintains that its fundamental criteria for qualifying employees is their level of competency. 24 Transport Canada, “Canada’s new government concludes new agreements with railways operating the federal grain hopper car fleet” (12 October 2007), at https://www.canada.ca/en/news/archive/2007/10/canada-new-government-concludes-new-agreements- railways-operating-federal-grain-hopper-car-fleet.html (last accessed 28 September 2021).
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 31 Figure 10. Covered hopper cars owned by the Government of Canada (Source: Transport Canada, TP 14995E, Government of Canada Hopper Car Fleet 2018 Annual Report, p. 3) The cars in CP’s fleet that are owned by the Government of Canada are designated as CP 600000–608591 series. They were mainly built between 1972 and 1985, and are equipped with Wabcopac or Nycopac truck-mounted brakes; they are not equipped with slack adjusters25 to compensate for wheel and brake shoe wear and to maintain uniform piston travel. 1.8.2 Canadian Pacific hopper cars Some of the hopper cars on the train were from CP’s own fleet: CP 384000 series cars and SOO series cars. The CP 384000 series cars were built in 1981 and were equipped with Wabcopac truck-mounted brakes, but were not equipped with slack adjusters. The SOO series cars were built between 1994 and 2006 and were equipped with newer technology, namely truck-mounted or body-mounted brakes that have automatic slack adjusters. 1.8.3 Leased cars The leased cars in CP’s grain fleet came from various car owners in the United States and were mainly equipped with body-mounted brake rigging systems with automatic slack adjusters. 1.8.4 Fleet composition of the occurrence train The fleet composition of the occurrence train was as follows:
25 A slack adjuster is a mechanical component designed to compensate for slack caused by wear that occurs to the brake shoes, wheels, and other brake rigging components. By automatically adjusting slack in the rigging, extension of air brake cylinder piston is maintained at the correct length to ensure uniform and maximum braking efficiency.
TRANSPORTATION SAFETY BOARD OF CANADA 32 • 40 cars: 2 cars in the CP 384000-384999 series and 38 Government of Canada cars in the CP 600000–608591 series; • 51 cars designated as SOO series, from CP’s own fleet; and • 21 cars from the fleet of leased cars. The air brake configuration for the cars on the train is provided in Appendix C, with the replacement history of the brake components. The maintenance history indicated that the cars on the occurrence train were maintained according to regulatory standards. 1.8.5 Renewal of Canadian Pacific’s grain car fleet Changes to the Canada Transportation Act in May 2018 allowed adjustments to reflect the costs incurred by railway companies to obtain and maintain hopper cars for the movement of grain. In response, CP initiated a review of its existing grain fleet and developed a multi- year plan to replace part of the fleet with new and higher capacity cars. CP started taking delivery of the new grain cars in September 2018. Since then, CP has been receiving new grain cars monthly. The program is expected to be complete by December 2022. As of October 2021, CP has brought into service a total of 5355 new grain cars (4500 purchased and 855 leased). 1.9 Railway operations in winter Winter conditions in northern climates, such as cold temperatures, ice and snow, present specific challenges for railway operations. In recognition of these seasonal challenges, most railways operating in the northern United States and Canada establish an annual winter operating plan that presents strategies to remain operationally viable and safe during the winter months. Typical winter operating plans may include proactive actions, for example: • pre-seasonal servicing of switch heaters and snow fighting equipment, • servicing of locomotive cooling systems and locomotive “hot start” systems, • ensuring a supply of suitable replacement rail in anticipation of cold-related rail breaks, • limiting train length to combat difficulties associated with train air supply on long trains, • renewing all end-of-car hose gaskets on intermodal and grain cars, • qualifying trains’ air brake systems to half of the allowable regulatory leakage rates, • speed reductions, • 30-minute standing air brake leakage test, • restricting loaded unit train operation during the night when extreme temperatures are forecasted, and • reinforcing the importance of appropriate clothing and personal protective equipment for employees working outdoors.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 33 1.9.1 Additional challenges in extreme cold temperatures Beyond the usual challenges faced in winter, extreme cold temperatures (about −25 °C)26 add another level of complexity to railway operations. For example, rails can become brittle and snap under load, and pull-aparts can occur when the rail anchors cannot overcome the intense compressive forces created when cold rail contracts. It is well known in the North American railway industry that cold temperatures can result in air leakage from freight car air brake systems.27 Rubber seals and gaskets become stiff and metal contracts, resulting in leakage of compressed air. In extreme cold temperatures, the effectiveness of air brake systems can further decline. Equally of concern is that symptoms associated with degraded braking efficiency on a train may not be obvious or straightforward for an LE to properly diagnose. To compensate for air leakage, air brake systems provide brake pipe pressure maintaining28 to replenish the lost compressed air. However, brake cylinders are only pressure maintained to approximately 8 to 12 psi, regardless of the air brake application in effect. Brake system leakage in extreme cold temperatures can be particularly problematic in mountain grade territories, where safe train speed control on long descending grades requires higher levels of brake cylinder pressure (BCP) for an extended length of time. 1.9.2 Previous winter restrictions for westbound trains operating on Field Hill In 2014 and 2015, CP implemented a number of procedural modifications to mitigate some of the challenges of operating trains on Field Hill in extreme cold temperatures. In 2014, and after an extended period of extreme cold temperatures, CP decided to temporarily limit the speed of grain trains to 10 mph when the temperature reached −20 °C, and to stage grain trains (hold them in a queue) during the night when the temperature dropped below −25 °C. Staging the trains allowed them to descend Field Hill in the warmer daylight hours, which assisted in better braking. This decision came after several grain trains had difficulties controlling their speed on Field Hill during extreme cold temperatures. Subsequent inspections of 2 of these trains (made up of CP 600000–608591 series cars) in Golden, BC, and in Eldon, Alberta, revealed leaking brake cylinders. Railway certified car inspectors noted that, in Golden, the brake cylinders had leaked off on a number of cars within 15 minutes and that, in Eldon, brake cylinders had leaked off within 20 minutes. These same trains did not have abnormally high leakage
26 Canadian Pacific, CP 2018–2019 Winter Contingency Plan (27 September 2018). 27 A. Aronian, K. Carriere, and E. W. Gaughan, “Train Qualification in Extreme Cold Temperatures,” presented at the Air Brake Association Technical Conference, Montreal, Quebec (22 September 2014). 28 For more information on the brake pipe pressure maintaining feature, see Appendix A.
TRANSPORTATION SAFETY BOARD OF CANADA 34 when they received their pre-departure inspections and No. 1 brake tests at Alyth Yard. However, leakage intensified with the colder temperatures encountered in the mountains.29 On 12 November 2015, ahead of the winter season, CP issued General Bulletin Order (GBO) M599 for westbound trains on the Laggan Subdivision. The bulletin restricted train speed to a maximum of 10 mph from east siding switch at Partridge to Field when the temperature reading at Mile 111.0 dropped below −25 °C, until braking was seen to be sufficient. The GBO was cancelled on 14 March 2016 concurrent with the end of the winter operating season. At the time of the occurrence, CP had a system-wide winter contingency plan, however, this plan provided no additional seasonal restrictions specific to mountain grade train operations. 1.10 Field Hill operating procedures Operating instructions can be found in CP time tables, General Operating Instructions (GOIs), GBOs, Special Instructions (SIs), operating bulletins, and train handling procedures. In this investigation report, the instructions applicable to Field Hill are called the Field Hill operating procedures (FHOP). The investigation reviewed several years of FHOP dating back to 1985. In 1990, the time table for the Laggan Subdivision contained SIs for trains left standing on grades: SPECIAL INSTRUCTIONS (HEAVY HAUL SYSTEMS)
- TRAINS LEFT STANDING ON GRADE
When the unit controlling a train is equipped with pressure maintaining, the train brakes may be left applied to hold the train when standing on a grade until ready to proceed, provided the train is not left unattended. If stop exceeds two hours and it is considered necessary to recharge the brake system before proceeding, sufficient hand brakes must be set to hold the train while recharging. Hand brakes must be set on rear of the train when on an ascending grade and on head end of the train when on a descending grade. Before releasing hand brakes, a sufficient brake pipe reduction must be made to hold the train while hand brakes are being released.30 According to these instructions, if a heavy train was stopped on Field Hill in excess of 2 hours and it was considered necessary to recharge the brake system, a sufficient number of hand brakes were to be applied to hold the train stationary while recharging.
29 There can be a 10 °C to 15 °C difference in temperature between Alyth Yard and Stephen, and a difference of 5 °C to 10 °C between Alyth Yard and Golden. However, in this occurrence, the temperature when the No. 1 air brake test was conducted at Alyth Yard was −26.4 °C; when the train was descending Field Hill, the temperature was −28 °C. 30 Canadian Pacific, Time Table No. 86, Special Instructions, Item 1 (09 December 1990).
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 35 The SIs were migrated from the Laggan Subdivision time table into the operating bulletins issued in conjunction with the time table. The first operating bulletin that contained the SIs was Heavy Haul – Canada Operating Bulletin No 93-A issued on 18 April 1993. The SI last appeared in Operating Bulletin No 93-C issued on 01 November 1993. In 1997, after an accident on Field Hill that resulted in the derailment of 66 cars during an uncontrolled high-speed descent,31 CP dedicated operating officers to accompany crews on every train operating westward on Field Hill for a period of 11 days to monitor operating practices and compliance with operating instructions. CP also issued Operating Bulletin 188 on 05 December 1997, which addressed emergency brake recovery procedures on Field Hill. After an incident on 02 January 1998, in which a freight train handling 112 cars ran uncontrolled between the Upper Spiral Tunnel and Field,32 CP assigned 7 operating officers and 8 experienced LEs to ride all trains for a 3-month period between Lake Louise and Field. They were tasked with monitoring train crew performance, revising speed restrictions on Field Hill, and devising the proper method of using the train braking systems on the steep grade. CP then issued 2 bulletins: one that addressed train operations in severe weather conditions and snow accumulation above the top of the rail, and another that mandated an emergency brake application if train speed reached 24 mph when descending Field Hill. The bulletins were included in the time table footnotes for the Laggan Subdivision, effective 26 June 1998.33 In 1998, after TC issued a notice and order requiring that maps be placed in time tables for subdivisions with grades greater than 1.5% and to provide train crews with train handling guidelines, CP developed new train handling procedures for Field Hill operations. The new guidelines were included in the time table footnotes for the Laggan Subdivision, effective 01 July 1998. They mandated a substantial speed reduction, a fully charged train brake system when descending Field Hill, and the use of retainers and/or hand brakes after an emergency brake application; they also provided specific instructions for when “release and catch” was required on the descent. Since then, the FHOP have changed several times. Table 4 highlights key changes from 1998 to 2019, with a focus on changes to the instructions related to the number of retainers/hand brakes to apply, and instructions on train speed after the lead locomotive passes the east siding switch at Partridge. At the time of the occurrence, the 2015 instructions were in effect.
31 TSB Railway Investigation Report R97C0147. 32 TSB Railway Investigation Report R98C0001. 33 Canadian Pacific, Time Table No 83 for the Prairie District (Alberta) (effective 26 June 1998), p. 56.
TRANSPORTATION SAFETY BOARD OF CANADA 36 Table 4. Summary of selected Field Hill operating procedures from 1998 to 2019 Notes i Percentage/number of cars requiring hand brakes if operating conditions dictate (e.g.: abnormal braking conditions such as weather and poor braking train). ii The instructions apply to westward trains handling more than 5000 trailing tons, except trains over 5000 tons in which the average weight per car is less than 100 tons. iii The instructions apply to westward trains in which the trailing tonnage exceeds 6000 tons or the weight per operative brake exceeds 100 tons. iv The instructions apply to westward freight trains in which the weight per operative brake is 100 tons or greater. Time table or other railway instruction Instructions on emergency procedures between Partridge and Field • Speed at which to put train in emergency • Cars requiring retainers set to high pressure position • Cars requiring hand brakes i Permissible speed after the lead locomotive passes the east siding switch at Partridge • 1998-06-26: Time Table #83 ii • 2001-02-18: Time Table #40 ii • Put train in emergency when speed attains 24 mph. • Retainers on at least 65% of cars. • Hand brakes on 100% of cars. i o Note: If there is doubt or uncertainty regarding the continued movement of the train, then contact the RTC and request to speak directly to a road manager. 10 mph; gradually allow speed to increase until it is known that a combination of train air brakes and mid-range dynamic brake are sufficient to control train speed at 15 mph. • 2004-01-21: Time Table #41 ii • Put train in emergency when speed attains 5 mph above permissible speed. • Retainers on at least 65% of cars. • Hand brakes on 100% of cars. i o Note: If there is doubt or uncertainty regarding the continued movement of the train, then contact the RTC and request to speak directly to a road manager. 10 mph; gradually allow speed to increase until it is known that a combination of train air brakes and mid-range dynamic brake are sufficient to control train speed at 15 mph. • 2005-03-16: Field Hill Job Aid iii
• Put train in emergency when speed attains 5 mph above permissible speed. • Job briefing: “Before the Emergency PCS [pneumatic control switch] is recovered, the locomotive engineer must initiate a discussion with the conductor as regards the need for hand brakes and/or retainers. They must consider train location, amount of train on grade, proximity of lesser grade, weather, rail or any other condition that may affect train braking. When agreement cannot be reached, the crew must contact a road manager and be governed by his/her instructions. • First and second emergency: Retainers on at least 65% of cars. • First and second emergency: Hand brakes on 100% of cars. i o Note: If there is doubt or uncertainty regarding the continued movement of the train, then contact the RTC and request to speak directly to a Road Manager. 15 mph • 2006-11-22: Time Table #42 iii • Put train in emergency when speed attains 5 mph above permissible speed. • Retainers on at least 65% of cars. • Hand brakes on 100% of cars. i o Note: If there is doubt or uncertainty regarding the continued movement of the train, then contact the RTC and request to speak directly to a road manager. [not exceeding] 10 mph, gradually allow speed to increase until it is known that a combination of train air brakes and mid-range dynamic brake are sufficient to control train speed at 15 mph.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 37 Time table or other railway instruction Instructions on emergency procedures between Partridge and Field • Speed at which to put train in emergency • Cars requiring retainers set to high pressure position • Cars requiring hand brakes i Permissible speed after the lead locomotive passes the east siding switch at Partridge • 2008-05-28: Time Table #60 iii • Put train in emergency when speed attains 5 mph above permissible speed. o Note: all westward trains experiencing a second emergency beyond mile 123.0 must communicate with a Road Manager and be governed by their instructions. • Retainers on at least 65% of loaded cars. • Hand brakes on 100% of cars. i o Note: If there is doubt or uncertainty regarding the continued movement of the train, then contact the RTC and request to speak directly to a Road Manager. [not exceeding] 10 mph, gradually allow speed to increase until it is known that a combination of train air brakes and mid-range dynamic brake are sufficient to control train speed at 15 mph. • 2012-11-28: Time Table #31 Module 15 iv • 2015-02-18: Time Table #31 Module 15.1 iv • 2015-10-14: Laggan Subdivision Train Handling Procedure iv
• Put train in emergency when speed attains 5 mph above permissible speed. o Note: all westward trains experiencing an emergency brake application beyond mile 123.5 must communicate with the on duty Trainmaster via the RTC and be governed by their instructions. • Job briefing: Before the Emergency PCS [pneumatic control switch] is recovered, all crew members (ie: locomotive engineer and conductor and Trainmaster) must perform a job briefing to discuss with each other the use of retainer valves. • First emergency brake application i o retainers on at least 75% of loaded cars. o hand brakes on 75% of cars. • Second emergency brake application o retainers on 100% of loaded cars. o hand brakes on 40 cars at head-end of train. i o Note: If there is doubt or uncertainty regarding the continued movement of the train, then contact the RTC and request to speak directly to a Trainmaster. [not exceeding] 15 mph, make sure it is known that a combination of train air brakes and mid-range dynamic brake are sufficient to control train speed at 15 mph. 1.11 Brake performance before the emergency stop The results of brake tests performed during the trip, as well as a review of train handling events from the LER data, provide insight on the train’s brake performance before the emergency stop. 1.11.1 Locomotive event recorder data The train was operating in DP synchronous mode during the trip and while descending Field Hill. In this mode, train handling commands used on the lead locomotives are transmitted via a DP radio to each of the remote locomotives. The remote locomotives, upon receipt of the radio message, respond by executing the train handling commands they receive. The signals sent by the lead locomotive ensure synchronous operation between all the remote locomotives distributed throughout the train.
TRANSPORTATION SAFETY BOARD OF CANADA 38 LER data obtained from a train’s lead controlling locomotive is normally the primary source of information used for analyzing train handling events; however, data from other locomotives operating in synchronous mode on the same train can similarly be used to support data analysis. The LER installed on lead locomotive CP 9538 was extensively damaged during the derailment, and the stored data were lost. However, LER data were successfully extracted from the 2 remote locomotives. The review of the LER data did not reveal any issues with the DP radio communications and both LERs showed identical train handling events, confirming that the data are consistent and provide an accurate account of the train events. A list of train handling events based on the LER data is provided in Appendix D (including DB information). 1.11.2 Applied air flow events After departing Alyth Yard, the LE observed applied air flow events on several occasions. The first observation occurred about 30 minutes after the train had departed Alyth Yard while the train was being brought to a stop at Keith at 1506 to allow other trains to clear through the area. During this time, the LE noticed an increase in brake pipe air flow immediately after having made an initial brake application. At later times, other applied air flow events were observed by the LE while bringing the train to a stop for train meets, one at Banff around 1805 and another at Eldon around 1910. The LE was not concerned with the applied air flow events. The train was otherwise handling as expected and no anomalies were noted, including both times the train was stopped at Eldon. The LE did not report the applied air flow events to the RTC at the time as there was no requirement to do so. 1.11.3 Running brake test A running brake test involves an application of the automatic brake while the train is proceeding, to verify that the brakes are able to slow the movement. Railway operating instructions require LEs to perform periodic running brake tests during weather conditions that may cause snow or ice buildup between brake shoes and wheels. In addition, the FHOP require that westbound trains make a running brake test prior to Mile 113.0, to condition the brakes34 and to verify their operability before reaching the steep descending grade of Field Hill. This requirement ensures that the test is conducted while the train is still traversing various ascending grades with a moderate change in elevation.
34 Conditioning the air brakes verifies they are operating as intended and ensures that the wheel tread surface and brake shoe interface is clear of ice and snow.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 39 CP’s GOIs in effect at the time of the occurrence35 provide additional information on when and how the running brake test is to be performed: 12.0 Running Brake Test 12.1 In the event of a complete Dynamic Brake failure enroute or when adverse weather conditions require the conditioning of the brakes, a running brake test must be performed on all trains prior to descending grades 2% or greater and at locations specified in special instructions.
Examples of adverse weather conditions include but are not limited to the following:
- Snow accumulations above the top of the rail
- Outside ambient temperature is −15° Celsius or colder
- Freezing rain conditions
A running brake test of passenger train brakes must be made after leaving any location where any standing train air brake test was made.
- 2 Running Brake Test Procedure
Step Description 1 When the speed of the train permits, apply the train brakes with sufficient force to verify the brakes are operating properly. 2 The locomotive brakes should not be allowed to apply at this time. 3 If the brakes do not operate properly, immediately stop the train, determine the correct cause of failure, then repeat the running brake test. According to the LER data, the automatic air brake had been applied on 2 separate occasions prior to Mile 113.0: • At about 1902, the train entered the Eldon Siding at Mile 105.7. After progressively reducing the throttle, an initial 7 psi brake pipe reduction was made at around 1907, followed by a further 3 psi brake pipe reduction to 10 psi to stop the train at the west end of the siding at about 1909. The train remained stationary for about 28 minutes, proceeded westward for 84 feet, and then stopped again at 1943. The train then remained stationary on the 0.55% ascending grade for about 35 minutes with an 11 psi automatic brake application in combination with fully applied (i.e., 72 psi of BCP) locomotive independent brakes. • At around 2019, a reverse movement was made in the eastward direction to back the train out of the siding at Eldon. When the train speed reached 21 mph, the DB was applied,36 followed by an initial 9 psi brake pipe reduction. When the train was about to clear the Eldon east switch, and with the DB having remained applied, the automatic brakes were fully applied (i.e., 26 psi brake pipe pressure reduction) from a speed of 14 mph. In the next 21 seconds, the brake pipe pressure was reduced from 79 psi to 62 psi and the train came to a stop a few seconds later.
35 Canadian Pacific, General Operating Instructions (revised 06 September 2018), Section 3, Item 12.0. 36 More information on DBs is provided in Appendix A.
TRANSPORTATION SAFETY BOARD OF CANADA 40 The LER data indicate that, during the train stops described above, the air brakes responded adequately and did not show any performance issues. Although it had recently snowed in the area, there was no snow accumulation above the top of the rail nor blowing snow during the brake applications that were made to stop the train at Eldon. The LE felt that the brake applications at Eldon were sufficient to fulfill the requirements of the FHOP and section 3, item 12.0 of the GOI. From the time the train departed the Eldon siding until it arrived at Stephen over 1 hour later, the automatic air brakes had been released and recharging. 1.11.4 Train handling on Field Hill before the emergency brake application The braking performance of the train had been satisfactory up to Stephen. It was only after the entire train was on the descending grade that the LE noted that the train was not braking as expected. Based on LER data, the LE made 5 separate service brake pipe reductions during the descent, yet the train continued to gain speed. Table 5 lists the brake pipe reductions in psi, the resultant brake pipe pressure (BPP) in psi and the corresponding air flow readings in cubic feet per minute (CFM). Table 5. Sequence of brake pipe reductions and air flow values* on the Field Hill descent Time Head end mileage Speed (mph) Train handling events 2128:13 123.12 8 Initiation of a 7 psi brake pipe reduction (starting BPP = 88 psi) 2128:27 123.15 9 Reduction of BPP to 81 psi 2128:37 to 2136:45 123.18 to 124.72 9 to 19 Fluctuation of air flow between 21 and 35 CFM 2137:01 124.80 19 Additional 3 psi brake pipe reduction (resultant BPP = 78 psi); air flow stops 2137:15 to 2145:46 124.88 to 126.41 19 to 12 Fluctuation of air flow between 20 and 31 CFM, until the next brake pipe reduction 2146:01 126.46 14 Additional 2 psi brake pipe reduction (resultant BPP = 76 psi) 2146:29 to 2146:33 126.58 to 126.60 15 to 16 Fluctuation of air flow between 20 and 24 CFM 2146:46 126.66 16 Additional 2 psi brake pipe reduction (resultant BPP = 74 psi); air flow less than 20 CFM 2147:19 126.82 19 Additional 2 psi brake pipe reduction (resultant BPP = 72 psi); air flow less than 20 CFM 2147:53 127.01 21 Reduction of BPP by 3 psi (resultant BPP = 69 psi) 2148:08 127.12 21 Application of the train brakes in emergency 2148:10 127.12 23 Beginning of BPP reduction from 69 to 0 psi
- Air flow values shown in the table do not represent total brake pipe flow; they represent only the flow
from the air brake system on the mid-train remote locomotive (UP 5359), which was 1 of the 3 operative sources of compressed air on the train. Additional air flow readings from the lead locomotive were not
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 41 available due to the loss of the LER data. The LER on the tail-end remote locomotive was a legacy device that did not record air flow information. 1.11.5 Emergency stop In spite of the incremental brake pipe pressure reductions, the train continued to accelerate down Field Hill. At 2147, and as the head end of the train approached Mile 127, the speed of the train reached 20 mph (5 mph above the maximum authorized speed). In the next minute, the LE, and separately the conductor, simultaneously applied the train brakes in emergency, which brought the train to a full stop at Mile 127.46, some 1 minute 25 seconds later at 2149:33. The conductor had opened the emergency brake valve located at the conductor’s work station as a back-up measure in response to the LE’s actions to bring the train to an emergency stop. In this situation, because of the train’s speed, the brakes were applied in emergency before the automatic brake application reached full service, i.e., about a 26 psi brake pipe reduction. The automatic brake application had reached a 19 psi brake pipe reduction when the brakes were applied in emergency. The train came to a stop with its tail end blocking the east siding switch at Partridge, preventing rail traffic in either direction through this location. As a result, 4 trains had to be stopped or held on the Mountain Subdivision and 7 trains stopped or held on the Laggan Subdivision. 1.12 Recovering from an emergency brake application on Field Hill 1.12.1 Emergency brake recovery procedure After the emergency stop on Field Hill, operating instructions and procedures required that the crew hold a job briefing with the trainmaster to determine the best course of action, and whether to recover the emergency brake application. The GOI in effect at the time of the occurrence stated, in part: 32.9 Uncontrolled Movements – Stop Required: Any movement descending a Heavy or Mountain grade that attains a speed 5 MPH above permissible speed is considered an uncontrolled movement and must be stopped immediately by whatever means is available, including (if necessary) using an EMERGENCY brake application. The movement must not proceed until it has been determined that sufficient braking is available to control the movement. This may require securing the train to recharge the brake system and/or the use of retainers.37
37 Canadian Pacific, General Operating Instructions (effective 14 October 2015, revised 06 September 2018), Section 1, Item 32.9, p.17.
TRANSPORTATION SAFETY BOARD OF CANADA 42 The train handling procedures in effect at the time for the Laggan Subdivision made a distinction between the actions to be taken for a first emergency stop and a second emergency stop, stating in part, 1.0 Train handling procedure The train handling procedure on page 4, and the following instructions in paragraphs A, B, C and D apply to westward freight trains in which the weight per operative brake is 100 tons or greater. Note: All westward trains experiencing an emergency brake application beyond mile 123.5 must communicate with the on duty trainmaster via the RTC and be governed by their instructions. A. Emergency brake recovery procedure – […] Trains which are stopped between mile 125.7 and Signal 1363 Field with the train air brakes in emergency, must be governed as follows: First Emergency Brake Application:
Before the emergency PCS [pneumatic control switch] is recovered, all crew members (ie: locomotive engineer and conductor and trainmaster) must perform a job briefing to discuss with each other the use of retainer valves. In the application GOI section 1, item 14.2 and 40.3, set retaining valves to the HP (high pressure) position on at least 75 percent of the loaded cars. When discussing the use of retainers and/or hand brakes, consider train location, amount of train on the mountain grade weather and rail conditions and any other conditions present that may affect the braking of the train. If abnormal conditions such as weather or poor braking train dictate that the application of hand brakes is necessary to secure the train while recharging, then apply a hand brake on at least 75 percent of the cars and set retaining valves to the HP position on at least 75 percent of the loaded cars.
Second Emergency Brake Application:
Apply retainers on 100% of the loaded cars and 40 handbrakes on the head end of the train.38 1.12.2 Methods for recovering from an emergency brake application To recover from an emergency brake application, retainers, hand brakes, or a combination of both can be used. Retainers and hand brakes serve different purposes. Once the decision is made to apply retainers or set hand brakes, the task is performed by the conductor. 1.12.2.1 Setting retainers Freight rail cars are equipped with a retainer, which is a pressure retaining valve connected to the brake cylinder exhaust port (figures 11 and 12).
38 Canadian Pacific, Laggan Subdivision (Incl Copithorne Spur) Train Handling Procedures (13 October 2015), Section 1.0.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 43 Figure 11. Retainer (Source: Canadian National Railway Company, with TSB annotations)
Figure 12. Retainer on a rail car (Source: TSB)
The purpose of retainers is to retain air pressure39 in the car brake cylinders, when required, after the train brakes are released and while the air storage reservoirs are being recharged on the cars. Setting a retainer on a car is a straightforward process that requires the 3-position retainer handle to be manually moved to the HP position. Setting retainers on an entire train is relatively manageable by a lone conductor, because they are visible and accessible from the ground, and the conductor does not need to board each car. Setting retainers on a stationary train does not provide additional brake retarding force while the train brakes remain applied. Rather, retainers are intended to provide a residual amount of braking force after the train brakes are released. This may help hold the train in a stationary position or control the speed while the air brake system is being recharged.40 1.12.2.2 Applying hand brakes All railway rolling stock is equipped with a hand brake, a mechanical brake device that will secure the car independently of the air brake system. Hand brakes are manually applied (and tightened) by turning the hand brake wheel (Figure 13). This causes the brake shoes to be pressed against the wheel tread surface to prevent the wheels from moving or to retard their motion. The effectiveness of a hand brake is directly proportional to the amount of force exerted by the person applying the brake, which can vary widely from one person to another.
39 More information on retainers can be found in Appendix A – Locomotive and freight car brakes. 40 It should be noted that the function of the retainer does not begin until the recovery of the emergency brake application begins, i.e., the air brakes are released and the recharging process begins.
TRANSPORTATION SAFETY BOARD OF CANADA 44 Figure 13. Conductor applying a hand brake (Source: TSB) Applying hand brakes requires care in safely negotiating the right-of-way, boarding the car by means of the ladder and grab irons and positioning at the hand brake. Conductors are required to establish a three-point stance before cranking the hand brake wheel clockwise to take up chain slack before applying maximum force on the crank. Variations in car design (i.e., access ladders, grab irons and platforms) require adaptations in the approach to accessing each hand brake crank and dismounting the car.41 Overall, applying effective brake force to the car is subject to the operator’s fitness, physical size and individual technique. In contrast to setting retainers, applying hand brakes requires significantly more time and energy to accomplish correctly. Setting hand brakes on 75% of the cars of a typical loaded grain train is a demanding task for a lone conductor, the success of which is dependent on multiple factors such as experience, physical strength, endurance and technique. In winter conditions on mountain grade, the task is made more difficult by bulky winter clothing and personal protective equipment, coupled with potentially deep snow along the right-of-way; it requires a sustained effort over several hours. Setting hand brakes on trains situated on main tracks can interrupt rail traffic, with corresponding repercussions on operations across the network. Unlike retainers, however, hand brakes do not rely on the train’s residual BCP for effectiveness. Although hand brakes were not applied on the occurrence train, in support of this investigation, the TSB conducted mechanical testing and human factors assessment of issues related to hand brake securement of freight trains on mountain grades. Appendix E provides a summary of the results from this study.
41 Canadian Pacific Railway Work Instruction Booklet, (General Operating Instructions 8 December 2015) Section 12.6: Securing Equipment by Applying Handbrakes, pp. 28–29.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 45 1.12.3 Job briefing after the emergency stop A job briefing between the inbound crew and the trainmaster was held after the emergency stop, as required by the FHOP. The focus was on the shared interpretation of the instructions, which describe actions and considerations required after the emergency stop. Given the conductor’s relative inexperience, the job briefing took the form of a conversation between the trainmaster and the LE. The trainmaster had dealt with emergency stops in mountain grade a dozen times as a supervisor and once as a conductor. His understanding was that the routine procedure had always been to use only retainers after a first emergency, and to include hand brakes after a second emergency, should one subsequently occur. Hand brakes would also be required to secure trains with mechanical problems that required repairs before resuming their descent. The LE, in his previous experience as a conductor, had once dealt with an emergency stop on Field Hill. On that occasion, he first applied retainers, but the train speed could not subsequently be controlled and the train had to be put into emergency a second time, at which point hand brakes were applied to secure the train before recovering from the emergency brake application. During the discussion, the LE mentioned the applied air flow events that he had observed along the way; however, the trainmaster did not perceive this information to be related to the difficulty controlling the train and indicated that he would look into it at a later date during a follow-up review of the LER download. The trainmaster assessed that the inbound crew could recover the emergency brake application and bring the train to Field. There was no mention of how much time was left on the inbound crew’s work clock. The trainmaster opted for the use of the retainers, set on the HP position, on 75% of the cars (84 cars). Factors such as the rail surface conditions, the extreme cold temperature, and the length of time that the train might remain stationary were not discussed. The trainmaster’s decision to apply only retainers was not questioned. The job briefing was centred on the use of the FHOP to guide development of a plan to bring the train safely down Field Hill. As such, guidance on retainer use contained in the FHOP was chosen over the use of hand brakes as the intent was to perform a “release and catch” and get underway. The decision to use retainers while recovering the emergency brake application was communicated to the RTC director. After the job briefing, at about 2230, the conductor began to set the retainers on 84 (75%) of the cars, as decided by the trainmaster and per the FHOP. The task, which was made more difficult by the mountainous terrain, the extreme cold, and the darkness, took about 1 hour. The conductor returned to the locomotive at approximately 2330. 1.13 Crew-to-crew transfer and delays When the train was stopped in emergency at 2150, the inbound crew was in its last hour of a 10-hour shift, which was scheduled to end at 2230.
TRANSPORTATION SAFETY BOARD OF CANADA 46 The RTC director, on hearing of the situation, recognized that setting retainers and recovering the emergency brake application would take the inbound crew past the end of their shift. As a result, he made the decision to call in a relief crew. There was already a crew in Field. The members of this crew—an LE, a conductor, and a conductor trainee—were due to come on duty at 2230 to relieve a different train. The director had them reassigned to the occurrence train. The relief crew left Field at the beginning of their shift as scheduled, at 2230, and made their way to Yoho by road vehicle, which took approximately 15 minutes. A series of circumstances contributed to delaying the relief crew. Because of the train’s location, the relief crew had to travel about 2 miles by rail in a snow removal track unit from Yoho to get to the lead locomotive. Doing pre-checks and readying the snow removal track unit took time, and the delays were compounded when a switch fouled with frozen snow had to be cleaned before the snow removal track unit could get under way. In total, the relief crew was delayed in Yoho for approximately 1.5 hours. The relief crew arrived at the train at around 0020 and held a job briefing with the inbound crew. The members of the inbound crew then boarded the snow removal track unit to travel to Yoho. At 0031, in preparation for resuming the trip, the relief LE told the RTC that he was waiting to ensure that the snow removal track unit and all personnel were clear of the main track before cancelling his joint authority with the track foreman; he indicated that, after receiving the “all-clear” confirmation, he would recover the emergency brake application, charge the brake system, and then proceed down to Field. At that point, the train had been stationary on the mountain grade in extreme cold temperatures, ranging from −25 °C to −28 °C, for almost 3 hours. About 10 minutes later, at 0042, shortly before the snow removal track unit and all on- board personnel were clear of the main track, the train began to roll uncontrolled. 1.14 Train dynamics simulation The TSB laboratory completed a series of train dynamics simulations using the Train Energy and Dynamics Simulator (TEDS) software program. The simulations examined factors such as speed, acceleration, in-train forces, braking efficiency, and stop distance. It showed the following: • The average efficiency of the air brake system on the occurrence train was about 60% to 62% of nominal expected values. • The train derailed mainly due to the high-speed centrifugal forces combined with the lateral force that was generated by moderate in-train buff forces. 1.15 Brake retarding force calculations Brake retarding force calculations were made to find out how much BCP would have been required to safely descend the average 2.2% Field Hill grade, stop the train with an emergency brake application, and hold the train stationary on the hill.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 47 The train departed Alyth Yard with the brakes cut out on 2 of the 112 cars because the brakes were defective. All calculations regarding braking forces took this into account and were based on 110 cars having operative brakes. The calculated brake retarding force values were numerically rounded to the nearest whole number for simplicity of presentation. For more information on the calculations used to obtain these values, see TSB laboratory report LP014/2022. The TEDS train dynamics simulation analysis results for braking efficiency and stopping distance verify and support the accuracy of the calculated values. 1.15.1 Brake retarding force required to maintain a constant speed Given the total tonnage of the occurrence train (approximately 15 000 tons) and the average 2.2% grade, a total retarding force of 630 050 pounds would have been needed to maintain a train speed of 15 mph while descending Field Hill. With the locomotives’ DB set at mid- to high-range (75% of maximum), they would have been providing 220 500 pounds. The remainder of the brake retarding force needed, 409 550 pounds, would have had to be generated by the 110 of the 112 grain cars to maintain a constant speed. Each car would have been required to provide a net retarding force of about 3720 pounds corresponding to a brake shoe force of 12 400 pounds.42 The brake effort calculations show that the 112-car loaded unit grain train with 110 cars with operational air brakes would have needed 25 psi average BCP on each operative car to maintain the train speed at 15 mph on the 2.2% descending grade. Theoretically, in the absence of leakage, a BCP of this magnitude can be obtained with a 10 psi brake pipe reduction. According to the LER data, the brake pipe pressure had been reduced by 19 psi during the descent, prior to the emergency brake application that brought the train to a stop. For a 19 psi reduction, the corresponding theoretical BCP should amount to 40 psi. 1.15.2 Brake retarding force generated by the emergency brake application At 2148:08, the train brakes were applied in emergency while the train speed was approaching 21 mph on the 2.2% descending grade. The train speed reduced during the next 85 seconds and the head end came to a stop on the main track around Mile 127.46, about midway between the Partridge siding switches. The train stopped after covering a distance of 1815 feet with the train brakes applied in emergency and with a full application of the DBs on the lead locomotive. Based on a stopping distance of 1815 feet, a retarding force of roughly 923 520 pounds would be required to bring the train to a stop on the 2.2% average descending grade. The 3 locomotives would deliver about 145 850 pounds of retardation due to the application of
42 The retarding force is equal to the brake shoe force multiplied by the coefficient of friction between the brake shoe and the wheel tread. For composite brake shoes (commonly used on rail cars), the coefficient of friction varies from 0.48 to 0.28. A value of 0.32 was used in the calculations.
TRANSPORTATION SAFETY BOARD OF CANADA 48 the independent brakes on the remote locomotives and the retention of full DBs on the lead locomotive.43 The remaining 777 670 pounds would have to be provided by the 110 cars with operative brakes. During the emergency brake application, the retarding force of each car would be roughly 7070 pounds on the wheels or a corresponding brake shoe force of 22 090 pounds. To generate this force, the required average pressure in the brake cylinder on each car would have to be 47 psi. With the train’s brake pipe and combined reservoir fully charged, an emergency brake application would have theoretically produced an average of 77 psi BCP in emergency. 1.15.3 Brake retarding force required to hold the train stationary after the emergency stop While the train was stopped with the brakes applied in emergency at Partridge, the total brake retarding force required to hold the train on the 2.2% grade was estimated to be about 593 360 pounds. This force needed to be provided by the 3 locomotives and the 110 cars with operative brakes. All 3 locomotives had full independent brakes applied (72 psi on DP lead, 45 psi on DP remotes), providing a retarding force of roughly 85 060 pounds. The remainder of the retarding force needed (508 300 pounds) had to be provided by the cars (4620 pounds per car). In order to deliver the required net retarding force of 4620 pounds, the corresponding brake shoe force would have to amount to 14 440 pounds. To generate such a force, the average pressure in the brake cylinder on each car would have to be at least 31 psi, representing an average brake retarding force per car of 40% of the theoretical maximum. If the BCP were to drop below this average, the train would not remain stationary, but would start to roll and accelerate down the grade. 1.16 Air brake system leakage Train air brake systems must be sufficiently charged with compressed air to operate as designed and to provide the expected amount of brake retarding force when required. The air brake system on a rail car comprises many components (brake pipe, control valve, auxiliary/emergency reservoir, brake cylinder), each containing many couplings, seals, and gaskets that are prone to air leaks. Air brake leakage is the leakage that exists in any part of the car air brake equipment from the air hose coupling gasket on one end of the car to the air hose coupling gasket on the other end of the car. It is commonly categorized as brake system leakage and brake pipe leakage. Brake system leakage refers to leakage in the car control valve (CCVs) and the air
43 DB functionality was not available on the remotely controlled locomotives while the air brakes were applied in emergency. Although the 2 DP remote locomotives were providing DB retarding force while the train was descending Field Hill, all DB retarding force that had been available was immediately removed by the legacy DP system when the air brakes were applied in emergency. This amounted to a loss of about 98 000 pounds of DB retarding force per locomotive, or 196 000 pounds in total.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 49 storage reservoirs; it includes brake pipe leakage. Brake pipe leakage includes leakage in the brake pipe, hose assembly, angle cock, combined cut-out cock and dirt collector, couplings, branch pipe, tee, and flange fittings. Aside from system leakage, additional leakage can result from loss of air from the brake cylinders when the air brakes are applied. The leakage of compressed air from air brake components is a fundamental problem in cold ambient temperatures. Air brake leakage typically increases with decreasing temperature, and can become quite pronounced in extreme cold ambient temperatures. Many of the seals and gaskets in the air brake system are made of rubber or a composite material. The effects of cold temperatures on rubber can vary, depending on its composition, age, and wear.44 Also, cold temperatures are generally known to decrease rebound resilience, making the rubber stiffer and less effective at preventing leakage. This is particularly the case for air brake components with extended time in service, such as CCV gaskets, brake cylinder packing cup gaskets, and old brake pipe flange gaskets. If the leakage of compressed air becomes excessive, or interferes with the normal operation of the air brake equipment, the brakes may not apply at all, produce less than the expected amount of retarding force, or unintentionally release after a period of time. A car that does not provide the expected amount of braking force does not fully contribute to the retarding force on a train. 1.16.1 Detection of air leaks during brake tests The leakage of compressed air, and the effects of air leakage, can be detected when freight cars and locomotives undergo various tests and inspections, such as the No. 1 brake test, the single car test (SCT), and the brake cylinder leakage test (which is only performed as part of the SCT). Brake inspection and various test procedures are covered in the industry-approved AAR Standard S-486,45 in TC-approved Railway Freight and Passenger Train Brake Inspection and Safety Rules,46 and in CP’s GOIs. These procedures evaluate the functional response of the CCVs for service and emergency brake application commands, as well as the proper release of the brakes. For more information, see Appendix B – Inspection and testing of air brake systems. 1.16.2 Compensating for air brake system leakage The air brake system has 2 important features that are designed to compensate for air leakage:
44 New-generation rubber formulations are designed to function without degradation at temperatures down to −40 °F (AAR Standard S-4001, “Rubber Products – Performance Testing”). 45 Association of American Railroads, Standard S-486, “Brakes and Brake Equipment Code of Air Brake System Tests for Freight Equipment – Single Car Test” (revised 2018). 46 Transport Canada, Railway Freight and Passenger Train Brake Inspection and Safety Rules (17 November 2017), Part II: Brake Test Requirements, section 11: No. 1 Brake Test, pp. 12–13.
TRANSPORTATION SAFETY BOARD OF CANADA 50 • Quick service limiting valve (QSLV) BCP maintaining: during service brake applications, CCVs maintain the BCP to approximately 8 to 12 psi, regardless of the air brake application in effect. The QSLV functionality is inoperative during an emergency brake application because the brake pipe pressure is reduced to 0 psi. • Brake pipe pressure maintaining: locomotive automatic air brake valves provide brake pipe pressure maintaining to replenish the loss of compressed air due to leakage effects. 1.16.2.1 Quick service limiting valve brake cylinder pressure maintaining CCVs incorporate a QSLV, which regulates the BCP between 8 psi and 12 psi in response to a minimum reduction brake application (7 psi reduction in the brake pipe pressure). The QSLV also has a pressure maintaining feature, which helps ensure that the BCP does not drop below 10 psi during subsequent brake pipe reductions when there is leakage in the brake cylinder, provided the leakage is not excessive. Figure 14 illustrates how this feature works. In response to a brake application amounting to a 15 psi brake pipe reduction, the BCP will increase rapidly from 0 psi to about 37.5 psi. In the absence of leakage, the BCP will remain at that level and will not trigger the operation of the QSLV. When there is brake cylinder leakage, however, the BCP will start declining progressively over time in proportion to the leakage rate. In the example shown in Figure 14, for an initial leakage rate of 1 psi per minute, the pressure reaches 35 psi and then drops down to 10 psi in about 20 minutes. When the BCP drops below 10 psi, the operation of the QSLV is triggered. At this point, the BCP is maintained at about 8 to 12 psi, roughly the equivalent of a minimum brake application, thus preventing the car brakes from becoming completely ineffective.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 51 Figure 14. Quick service limiting valve – braking degradation curve following a brake application (15 psi brake pipe reduction) (Source: A. Aronian and L. Vaughn, “NYAB Brake Cylinder Maintaining Trials Update,” presented at the Air Brake Association Conference, Minneapolis, Minnesota, United States [October 2015])
Since 2014, new generation CCVs can also include a brake cylinder maintaining (BCM) feature in addition to the QSLV pressure maintaining feature. BCM is available not only for minimum brake applications, but also up to a full-service brake application. More information on this feature is provided in section 1.23.2. 1.16.2.2 Brake pipe pressure maintaining When there is leakage in the air brake system, whether from the cars’ air brake components or the car-to-car end hose coupling, the air needed to replenish the leaked air comes from the brake pipe. To compensate for the loss of air in the brake pipe, locomotive automatic brake valves have a brake pipe pressure maintaining feature that allows compressed air from the locomotive air brake system to flow into the brake pipe in direct proportion to brake pipe leakage. The air is supplied at a controlled rate to avoid causing an unintended release of the train brakes. During service brake applications, brake pipe pressure maintaining allows the selected brake pipe pressure reduction to be maintained for long periods of time. This feature allows a train to descend a long mountain grade with the brakes remaining continuously applied as needed. Otherwise, controlling train speed on long descending grades would be difficult. Without brake pipe pressure maintaining, leakage will cause the brake pipe pressure to continually decrease after the brakes have been applied. This can cause an undesired
TRANSPORTATION SAFETY BOARD OF CANADA 52 reduction in brake pipe pressure resulting in an increase in braking effort on the cars, leading to a potential stall condition of the train on the descending grade. Eventually, the brake pipe pressure will drop to 0 psi. 1.16.3 Effects of air leakage on brake application propagation 1.16.3.1 Leakage from the car control valves When a reduction in brake pipe pressure is made from a locomotive to apply the brakes on a train, the pressure reduction at the locomotive will propagate outward as a pressure wave along the brake pipe. At the same time, the function of the locomotive automatic brake valve will change from pressure-maintaining mode (supplying air into the brake pipe) to pressure-reduction mode (brake pipe reduction). Once the pressure reduction wave reaches each individual car, the pressure differential between the brake pipe and the auxiliary reservoir will normally cause the CCV balancing valve to allow compressed air to move from the auxiliary reservoir into the brake cylinder to apply the car brakes. However, the presence of excessive air leakage through the CCV service portion can create a localized reduction in brake pipe pressure and interfere with how the CCV responds. Consequently, a small brake pipe pressure reduction, such as 1 to 2 psi, can become diminished and attenuated to a point where it is insufficient to further reduce the pressure drop induced by the leakage. If this happens, the CCV may not respond to the brake pipe pressure reduction and fail to make the desired brake application. 1.16.3.2 Leakage from the auxiliary reservoir The leakage of compressed air from a car’s auxiliary reservoir is another factor that can negatively impact the total amount of brake retarding force on a train. The auxiliary reservoir is connected to the brake pipe through the CCV. If leakage from the auxiliary reservoir becomes excessive, to a point where the reservoir pressure drops 1.5 to 2.0 psi below the brake pipe pressure, the CCV will initiate a localized, undesired release of a car’s service brake application. Auxiliary reservoir leakage is difficult to detect. Since the leakage is typically not audible, it can be easily missed during walking, drive-by, or pull-by inspections, such as the ones performed as part of the No. 1 brake test. Also, under the inspection conditions of the No. 1 brake test, the leakage seldom results in a brake release. For these reasons, a test for auxiliary reservoir leakage is required when performing an automated single car test (ASCT).47 SCTs, however, are performed infrequently. In addition, unless the car is equipped with a 4- port adapter connection that allows the SCT apparatus to be connected directly to various
47 In an automated single car test, an approved test device is used to verify the operation of the air brake system on an individual car. For more information, see Appendix B – Inspection and testing of air brake systems.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 53 parts of the air brake system, there is no quantitative way to directly check for auxiliary reservoir leakage during an SCT.48 On cars where the SCT apparatus must be connected to the end-of-car air hose, auxiliary reservoir leakage can only be indirectly assessed through 2 different tests: the multi-step system leakage test and the brake cylinder leakage test. The multi-step system leakage test (described in AAR Specification S-486, Section 3.5) is used to detect system leakage in general, not auxiliary reservoir leakage in particular. The test measures the overall leakage of compressed air from the car’s brake pipe, auxiliary and emergency reservoirs, combined dirt collector and cut-out cock, and all brake pipe couplings. When leakage is detected, the source could be any of these components. The maximum allowable system leakage rate during this test is 225 cubic inches per minute. As its name indicates, the brake cylinder leakage test (described in AAR Specification S-486, Section 3.14) is designed to check for brake cylinder leakage and measure the leakage rate. For this test, the brakes must remain applied on the car for 4 minutes and the measured change in BCP due to leakage must be less than 1 psi during the last minute, i.e., 1 psi/minute. If the brakes release during this test, it can provide an indication that the auxiliary reservoir is leaking and that the leakage rate is greater than 145 cubic inches per minute. Figure 15 shows the effect of auxiliary reservoir leakage on a brake application. In this example, air leakage of 145 cubic inches per minute (the maximum allowable leakage rate from the auxiliary reservoir) was induced in the auxiliary reservoir, a 10 psi brake pipe reduction was made, and the brakes were held for 5 minutes, which was 1 minute longer than the time stipulated in the S-486 brake cylinder leakage test. At the end of this extended-duration test, an undesired brake release occurred.
48 On a car not equipped with a 4-port adapter, auxiliary reservoir leakage can be detected by performing a soap and bubble test on specific component fittings, except for minimal leakage. Regarding this test, the AAR standard S-486, Section 3.5, System Leakage, Test 3.5.2 states, in part, "Soap both reservoir pipes, fittings, and gaskets. No leakage allowed."
TRANSPORTATION SAFETY BOARD OF CANADA 54 Figure 15. Release of 10 psi brake application due to auxiliary reservoir leakage (Source: K. Carriere and B. Gallagher, “Brake System Forensics,” in: Proceedings of the 99th Annual and Technical Conference of the Air Brake Association, Inc., Chicago, Illinois, 13–14 September 2007, with TSB formatting and annotations)
The occurrence train comprised a mixture of cars, some equipped with a 4-port adapter and some without. It is possible that some of the cars had developed auxiliary reservoir leakage in excess of 145 cubic inches per minute since their last SCT, which went undetected during various field brake tests, leading to an undesired release of the brakes during a service brake application on these cars. 1.16.3.3 Leakage from the brake cylinder The leakage of compressed air is expected to occur from a rail car, particularly during the colder winter operating season. The leakage rate can vary considerably from car to car depending on several factors. Most of the leakage that may occur will not interfere with the proper operation of the car’s air brake system, nor is it detrimental to the car’s brake effectiveness. The brake cylinder, however, is one air brake component that can be critically affected by leakage. The effectiveness of the air brakes on a car is dependent on the amount of initial pressure that builds up in the brake cylinder in direct response to a brake application command from the controlling locomotive and how long the pressure is retained. The loss of BCP on a car due to leakage will reduce the brake force provided by the car. A brake cylinder that has a significant amount of leakage may completely bleed off in emergency to the point where the brake shoes no longer contact the wheel tread surface, rendering the brakes completely ineffective. A car that does not provide the expected amount of braking force does not fully contribute to the retarding force on a train.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 55 To compensate for leakage, the locomotive automatic air brake system will provide brake pipe pressure maintaining to replenish the loss of compressed air due to the combined leakage that occurs throughout the train. While this is highly beneficial, the brake cylinders on a car are only pressure maintained to a maximum of approximately 8 to 12 psi, regardless of the air brake application in effect. For the vast majority of train operating scenarios (that involve operating trains on grades of less than 1% and other locations where brake applications are only required for a few minutes), this amount of BCP is more than adequate to safely control train speed and stop the train whenever required. However, brake cylinder leakage can be particularly problematic for a heavy-weight train descending a long grade where the air brakes will remain applied for a longer duration. For example, descending the 13.5-mile Field Hill grade at 15 mph requires air brakes to remain engaged and provide a constant amount of brake retarding force for over 52 minutes. The maximum allowable brake cylinder leakage is 1 psi per minute during a 1-minute test interval, per AAR Standard S-486, Code of Air Brake System Tests for Freight Equipment - Single Car Test. With leakage of air from the brake cylinder, even within acceptable limits, the force exerted by the piston is reduced, resulting in less effective braking on that car. As an example, at an average leakage rate of 1 psi per minute on each car, the occurrence train would have lost 52 psi of BCP on the descent of Field Hill, which represents an 81.3% loss in braking capacity. Nearing the bottom of the descent, the remaining BCP on the train would have been the equivalent of a minimum reduction brake application (7 psi), which would have been insufficient for the train to maintain the maximum allowable speed of 15 mph. Brake cylinder leaks are worsened by the deterioration of packing cup gaskets due to aging and wear, as well as by the degradation of the grease lubricating the packing cup system. These leaks are accentuated in cold temperatures, when rubber packing cups, gaskets, and grease harden and contract. At the time of the occurrence, there was no requirement to perform periodic maintenance on rail car brake cylinders. Therefore, brake cylinders could remain in service for long periods of time. Brake cylinder leakage remains the second highest cause of failure during the single car test, after CCV failures (Figure 16).
TRANSPORTATION SAFETY BOARD OF CANADA 56 Figure 16. Percentage of single car test failures by cause of failure (Source: E. Gaughan and K. Carriere, “Troubleshooting a freight car brake system” presented at the Air Brake Association annual conference, Indianapolis, Indiana [September 2013]. TSB edited for clarity.)
- 16.3.3.1 Brake cylinder leakage after an emergency brake application
Wabtec Corporation (Wabtec) performed tests on its 150-car AAR-approved test rack to measure the change in BCP following an emergency brake application with various induced leakage rates.49 The brake equipment in the test rack apparatus emulates braking systems on 50-foot cars. Figure 17, derived from these tests, represents BCP degradation for various leakage rates. It describes the evolution of BCP after an emergency application, as all pressures start at around 77 psi at time zero for a fully charged air brake system. The graph shows that, for an initial leakage rate of 0.5 psi per minute, the drop from 47 psi BCP down to 31 psi (the pressure at which the brake force becomes insufficient to hold the occurrence train stationary on the hill) will take about 6600 seconds (1 hour and 50 minutes).
49 K. Carriere, “Initiatives in Braking Maintenance Methodology,” presented at the Canadian Air Brake Club – Western Chapter (03 February 2020).
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 57 Figure 17. Brake cylinder pressure degradation after an emergency application (Source: Wabtec, with TSB annotations)
- 16.3.4
Other factors affecting the propagation of air brake applications Excessive brake pipe leakage can also result in degraded performance of braking effort after a split reduction50 when there are extended time intervals between the successive brake pipe reductions. When the pressure maintaining function is active, the air flow into the brake pipe clashes with the brake pipe exhaust, rendering it insufficient for some CCVs to properly sense and respond to any subsequent brake pipe pressure reduction that may follow the initial minimum brake application. 1.17 Monitoring the brake pipe air flow There are various types of air flows associated with the operation of the air brake system, such as charging flow, release flow, and applied flow. A flow indicator in the locomotive cab provides useful information about these different flow conditions, whether changing or steady-state. “Charging flow” refers to the flow that occurs while the brake pipe and the air storage reservoirs on the cars are being filled with compressed air. The maximum flow occurs immediately after the LE releases the train air brakes. The flow will gradually reduce and
50 A split reduction is a minimum reduction followed by subsequent small brake pipe reductions without releasing and re-applying the brakes.
TRANSPORTATION SAFETY BOARD OF CANADA 58 eventually level off to a steady-state value once the brake pipe and car air storage reservoirs are fully charged. After the brake system is fully charged, any “steady-state flow” that exists indicates the brake pipe is being pressure maintained to compensate for leakage from the air brake system. The amount of flow is proportional to the leakage, and there may be no evident flow if minimal leakage exists. Under normal circumstances, when brake pipe pressure is reduced to apply the brakes on a train, the air flow value decreases and stabilizes again to a steady-state value. A rise in air flow when the air brakes are applied is referred to as “application flow” or “applied air flow” and is indicative that one of the following undesired events could be occurring: • the brakes on the train are releasing (unintentionally); or • there are other sources of air leakage, notably leakage through the bottom cover exhaust port of the New York Air Brake (NYAB) DB-10 service portion of the CCV and/or leakage through the brake cylinder packing cup gasket. In the presence of leakage from CCV service portions or brake cylinders, the air flow in the brake pipe will increase rather than decrease when a brake application is made. This will result in the additional flow of compressed air from the brake pipe through these sources of leakage. This will, in turn, trigger the locomotive brake pipe pressure maintaining feature to re-engage to: • replenish the air that is being leaked through these air brake components; and • maintain the air pressure in the brake pipe. Figure 18 shows the 3 different flow conditions associated with the operation of the air brakes.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 59 Figure 18. Brake pipe air flow (Source: TSB)
On a DP train, air flows not only from the lead controlling locomotive, but also from operative remote locomotives, which serve as additional air brake pressure control points and provide supplemental sources of compressed air for brake pipe charging and pressure maintaining. The air flow contribution for each of the linked DP locomotives is individually displayed on the DP operations screen that is monitored by the LE. The total air flow being supplied to the train’s air brake system is the combined total coming from all DP locomotive air sources. 1.17.1 Air flow measurements and brake system leakage Wabtec investigated changes in brake pipe air flow associated with degraded brake system performance.51 The investigation involved analyzing selected LER data files, as well as conducting a series of laboratory tests on a 150-car test rack, to examine the response of the air brake system to various leakage conditions. Some of these tests were designed to re- create additional leakage effects that are known to occur on brake equipment that has outlived its effective service life, particularly when operating in cold-temperature environments. This research and analysis effort, based on leakage and air flow assessments, yielded new insight that can be used by industry, and particularly LEs, to better assess leading indicators of and diagnose degraded braking efficiency.
51 E. W. Gaughan, “Applied Flow Diagnostics - Hidden in Plain Sight,” submitted for the Air Brake Association conference, Minneapolis, Minnesota, United States (September 2019).
TRANSPORTATION SAFETY BOARD OF CANADA 60 The rack test data confirmed that, for a constant leakage rate, brake pipe air flow decreases when brake pipe pressure is reduced to apply the brakes on a train. The data also confirmed that larger brake pipe pressure reductions will result in a proportionately larger decrease in air flow. As the Wabtec test report states, in part, The corresponding brake system analogy is that the air flow with the brakes applied – ‘applied flow’ - will be less than the flow with the brakes released – ‘release flow’ for any given condition.52 Additional rack tests were conducted to measure the impact on air flow when the leakage rate was increased, to re-create the effect of additional sources of leakage on some of the cars when the air brakes are applied. For the tests, various levels of brake cylinder leakage were induced on 75 of the 150 cars in the test rack. Table 6 shows the change in applied flow associated with various levels of brake cylinder leakage when the 90 psi brake pipe pressure was reduced by 10 psi. These tests were focused on the brake cylinder leakage, and therefore CCVs were not included as a source of leakage, although defective CCVs can also have gaskets that leak and this can vent pressure from the brake pipe, reservoir, and/or brake cylinder. Table 6. Applied air flow vs leakage on 75 cars with a 10 psi brake pipe reduction (Source: TSB, based on E. W. Gaughan, “Applied Flow Diagnostics - Hidden in Plain Sight”, submitted for the Air Brake Association conference, Minneapolis, Minnesota [September 2019]) Brake cylinder leakage rate (psi/min) Brake pipe air flow with 10 psi brake application (CFM) Total change in brake pipe air flow compared to no leakage (CFM) 0* 8.6** n/a 1 10.7 2.1 2 12.2 3.6 5 16.1 7.5 * No brake cylinder leakage ** Flow decreased by 1.4 CFM compared to 10 CFM flow with the brakes released and with no leakage A brake cylinder leakage of 1 psi/minute (the AAR S-486 maximum acceptable limit during an SCT) on 75 of the 150 cars will result in an increase of about 2.1 CFM in applied air flow after a 10 psi brake pipe reduction. Double-digit increases in applied air flow when brakes are applied would indicate excessive brake cylinder leakage, as well as leakage at CCV gaskets. Figure 19 shows how the demand on brake pipe flow increases to compensate for various rates of brake cylinder leakage. The graph presents results of tests performed on the Wabtec 150-car test rack using a minimum brake pipe pressure reduction (7 psi). If all 150 cars on the rack had leaking brake cylinders at a rate of 3 psi/minute, the total increase in applied air flow would only be about 10 CFM. An air flow increase of this magnitude would be noticeable only when there was already air flow of 20 CFM or greater circulating in the brake pipe (flow below 20 CFM is shown as 0 on the locomotive air flow meter).
52 Ibid.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 61 Figure 19. Applied flow increase for 150 cars, each 50 feet in length (Source: Wabtec, with TSB annotations) 1.17.1.1 Applied air flow readings before the emergency stop Shortly after departing Alyth Yard, the inbound LE noticed an increase in brake pipe air flow whenever the air brakes were applied (see section 1.17.2 for details). These applied air flow events occurred while bringing the train to a stop for train meets at Keith, Banff, and Eldon. In addition, a sudden and unexpected increase in air flow appeared shortly after making a 7 psi minimum brake pipe pressure reduction as the head-end of the train was starting to descend Field Hill. About 8 minutes later, when the brake pipe pressure was further reduced by 3 psi, another applied flow was observed. Data from the event recorder on the UP 5359 mid-train remote locomotive show a sudden and unexpected increase in air flow of up to 35 CFM a few seconds after a brake pipe reduction during the initial descent into Partridge. This is illustrated in Figure 20.
TRANSPORTATION SAFETY BOARD OF CANADA 62 Figure 20. Graph showing the unexpected increase in air flow as the train descended Field Hill (Source: TSB, based on data from the UP 5359 locomotive event recorder)
Just prior to the emergency application, 3 incremental brake pipe pressure reductions of 2 psi each were made. However, there was no air flow reading following these reductions because the brake pipe leakage was diminished, due to the following reasons: the brake pipe pressure was reduced; there was not enough time to lap53 the brake pipe reduction and activate the pressure maintaining feature to generate increased air flow; and the total flow was less than 20 CFM. Sources of increased air flow may be due to air brake system leaks, where […] brake equipment that has outlived its effective service life may result in generating leakage only when the brake is applied. Defective control valves may vent brake pipe, reservoir or cylinder pressure when applied. Leakage out of brake cylinders will result in a decrease in pressure to the threshold of the quick service limiting valve or the brake cylinder maintaining feature resulting in an increased demand on brake pipe.54 1.17.2 Air flow meter Locomotives are equipped with a brake pipe air flow indicator, commonly referred to as the air flow meter (AFM). The AFM displays the measured rate of air flow, expressed in cubic feet per minute (CFM), flowing from the locomotive’s air reservoir into the train’s brake pipe. The AFM is the primary means used by an LE to monitor the movement of air into the brake pipe due to a pressure differential, such as when the brakes are applied, released, or while the brake pipe is being charged or pressure maintained. The AFM is also used during mandated air brake qualification tests, such as the No. 1 or No. 1A.55 The AFM display reading is used during these tests to determine that the total air
53 The position of a brake valve when the pressure being controlled is being neither increased nor decreased. 54 E. W. Gaughan, “Applied Flow Diagnostics - Hidden in Plain Sight,” submitted for the Air Brake Association conference in Minneapolis, Minnesota, United States (September 2019). 55 A No. 1A brake test is performed by qualified train crew members, whereas a No. 1 brake test is performed by certified car inspectors. For more information on the No. 1 brake test, see Appendix B – Inspection and testing of air brake systems.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 63 flow into the brake pipe does not exceed the maximum allowable regulatory limit 56 when the air brakes are released. On locomotives equipped with operator display screens, the air flow is shown in a box identified as “Flow” (Appendix A, Figure A5). The value displayed on the screen indicates the amount of air flow going from the locomotive main reservoir into the brake pipe. When the train brake system is being replenished, the air flow indicator displays a high value, typically higher than 60 CFM. As the system becomes charged, the value displayed comes down, indicating a decrease of flow. The air flow indicator and the LER download will show 0 for any air flow below 20 CFM. Displayed air flow values (20 CFM and higher) normally occur only when the air brakes are released and while the brake pipe and car air storage reservoirs are being replenished. An LE monitors the AFM for expected changes in air flow that indicate the air brake system is responding to air brake application and release commands. Unexpected changes in air flow can provide an indication about important changes that are occurring in the brake system, whether due to temperature-sensitive leakage effects, or an emergent condition such as an undesired brake release. Brake cylinder leakage normally goes undetected, unless the LE observes a sudden rise in air flow during a service brake application and understands the implications. The LE has no other indication of systemic brake cylinder leakage, except the fact that the commanded brake application fails to produce the required and expected speed retardation on the train. 1.17.3 Attention and information displays When operating a locomotive, an LE is required to periodically monitor various operating gauges, including the AFM. The information displayed by the AFM can provide important feedback on braking effectiveness. By design, high air flow events leading to exceedances will not generate exceptional aural or visual caution on the operator display screen. “Sensory conspicuity” refers to the ability of an object to capture the attention of an observer who does not necessarily expect it to be present or is looking the other way.57 Characteristics of warnings, objects, or conditions that are likely to attract an operator’s attention include areas or objects that differ greatly from their backgrounds in terms of brightness, colour, and texture; flickering or flashing stimuli; objects of large size; and objects that are moving.58 Red flashing lights and an audible warning are typical characteristics of warnings that are designed to attract attention.
56 Transport Canada, Railway Freight and Passenger Train Brake Inspection and Safety Rules (17 November 2017), Part I: General, section 7.8, p. 8. 57 P. L. Olson, R. Dewar, and E. Farber, “Vision, audition, vibration and processing of information,” Forensic Aspects of Driver Perception and Response, 3rd edition (Lawyers & Judges Publishing Company, Inc., 2010). 58 B. S. Oken, M. C. Salinsky, and S. M. Elsas, “Vigilance, alertness, or sustained attention: Physiological basis and measurement,” Clinical Neurophysiology, Vol. 117 (2006), pp. 1885–1901.
TRANSPORTATION SAFETY BOARD OF CANADA 64 The AAR Manual of Standards and Recommended Practices stipulates that, in terms of design philosophy, the urgency of rail information conveyed by an alarm shall be indicated by the background colour (that is, alarms with red backgrounds are most urgent, alarms with yellow backgrounds are less urgent, and alarms with white backgrounds are the least urgent).59 “Cognitive conspicuity” concerns the importance and relevancy of information to an operator’s context,60 such as air flow information when braking. To ensure that the most important visual cues for a specific scenario are detected by the operator, the cues need to be easily discriminated as the most relevant and not masked or weakened by other more noticeable cues. Older, more traditional air flow meters had a design philosophy in line with these recommended practices. They were associated with amber warning lights and auditory feedback from the 26L automatic brake valve, which indicated to an LE when the air flow was increasing above normal parameters. With more modern locomotives, information is presented on a smart display, where the air flow indicator is not associated with any alarms, alerts, or colour coding. The design of the AFM on the occurrence locomotive displayed a small white number that did not flash, or change colour or prominence, regardless of the circumstances or the flow rate that was displayed. The manner in which data is displayed requires a level of interpretation from the LE to inform follow-on actions if and when required. 1.18 Testing of the recovered cars After the occurrence, testing was conducted on the 13 cars that remained upright and the tail-end remote locomotive (CEFX 1040) to identify underlying factors that contributed to the loss of braking control on the occurrence train. The tests were conducted outdoors in cold ambient temperatures similar to the conditions that existed at the time of the occurrence. Additional tests were later conducted in the warmer temperatures of a shop environment. The 13 cars (Table 7) represented about 11% of the total 11261 cars on the occurrence train.
59 Association of American Railroads (AAR), Manual of Standards and Recommended Practices, section M: Locomotives and Locomotive Interchange Equipment, S-591: Locomotive System Integration Operating Display (2007, updated 25 February 2010). 60 P. A. Hancock et al., “Driver workload during differing driving manoeuvres,” Accident Analysis and Prevention, Vol. 22, No. 3. (1990), pp. 281–290. 61 Two of the 112 cars on the train had their air brakes cut out. However, the 2 cars were included for analytical purposes and comparison with the 13 recovered cars, given that they provided additional data points in terms of fundamental statistics (age, maintenance history, car control valve (CCV), wheel temperature detector (WTD) data).
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 65 Table 7. Characteristics of the brake systems on the 13 recovered cars Car position Car designation Year built Car age (years) * Make and model of car control valves on occurrence train Brake cylinder mounting location (model) Slack adjuster Service portion Emergency portion 1 SOO 119682 1998 21 NYAB DB-10 NYAB DB-20 Body Yes 2 COER 354009 2016 3 Wabco ABDX Wabco ABDX Body Yes 3 SOO 115417 1994 25 Wabco ABDX Wabco ABDX Truck (TMX) Yes 4 CP 602554 1976 43 Wabco ABD Wabco ABD Truck (Wabcopac) No 5 CP 608497 1985 34 Wabco ABD Wabco ABDW Truck (Wabcopac) No 6 CP 602255 1976 43 Wabco ABD Wabco ABD Truck (Wabcopac) No 7 CP 607911 1984 35 Wabco ABD Wabco ABDW Truck (Wabcopac) No 8 SOO 118863 1997 22 Wabco ABDX Wabco ABDX Truck (TMX) Yes 9 SOO 113918 1995 24 Wabco ABDX Wabco ABDX Truck (TMX) Yes 10 SOO 119626 1998 21 NYAB DB-10 NYAB DB-20 Body Yes 11 CP 604013 1977 42 Wabco ABD Wabco ABDW Truck (Wabcopac) No 12 DME 51387 2005 14 NYAB DB-10 NYAB Wabco ABDW Body Yes 13 COER 354979 2007 12 NYAB DB-10 NYAB DB-20 Body Yes * Age of car at the time of the occurrence 1.18.1 Outdoor testing The outdoor testing took place in Banff, Alberta. The locomotive and the 13 cars were placed at the west end of the Banff siding track located at Mile 82.1 of the Laggan Subdivision. A test plan was developed with the main goal to verify the performance of the air brake system on the locomotive and the cars, and to identify underlying factors that contributed to the loss of braking control on the occurrence train. Various test teams were assembled and included representation from CP and TC. Tests were performed outdoors in Banff during the 3-day period of 08 February to 10 February 2019. These dates were selected because the ambient temperatures for those days were forecast to be below −20 °C, which would replicate, as closely as possible, the conditions that existed at the time of the occurrence. A series of tests was performed on the locomotive and the cars assembled as a train and included a visual inspection, a No. 1A brake test, a brake system leakage test, and brake cylinder leakage tests (with and without the retainers applied). A cold-temperature SCT was performed on each car individually. 1.18.1.1 Visual inspection A visual inspection was performed on the locomotive and 13 loaded grain cars. The inspection confirmed that the air hoses were coupled, the angle cocks between all pieces of rolling stock were all in the fully open position and there was no visible damage on any of the air brake equipment. The empty/load device sensor arms were confirmed in the loaded
TRANSPORTATION SAFETY BOARD OF CANADA 66 position on all 13 loaded cars. The wheel tread surfaces and brake shoes were further examined for any evidence of heat stress damage. The wheel tread surfaces showed only medium blueing on less than half of all the wheelsets.62 1.18.1.2 No. 1A brake test A No. 1A brake test using the air flow method was conducted on the locomotive and the cars assembled as a train. The test was successfully completed and served to verify that 11 of the 13 cars met the requirements of the test. The 2 exceptions were CP 602554 (brakes did not apply) and COER 354979 (piston retracted while the test was in progress). 1.18.1.3 Brake system leakage test A standing brake test63 was performed to measure brake system air leakage. The standing brake test requires only 2 measurements, taken at fixed intervals. If the 2 measurements are equal, no leakage exists. If the 2 measurements are different, a leakage rate is calculated. A simplified brake pipe pressure drop test procedure was used because of the relatively small number of cars involved, the small total volume of compressed air in the brake system, and the cold ambient temperature. The simplified procedure consisted of the following steps: • charging the brake systems to 90 psi • applying the air brake on each rail car by making a 15 psi reduction in brake pipe pressure • waiting for the brake pipe pressure to settle at 75 psi and match the pressure setting on the locomotive’s equalizing reservoir • closing (isolating) the brake pipe by cutting out the locomotive automatic brake to disable the brake pipe pressure maintaining feature • monitoring leakage from the brake pipe for approximately 60 seconds With the source of compressed air cut out, the measured brake pipe pressure had dropped from 75 psi to 72 psi after 60 seconds elapsed, yielding a leakage rate of 3 psi/min.64 1.18.1.4 Cold-temperature brake cylinder leakage test Two key indicators of air brake performance and braking effectiveness on a car are the amount of initial pressure that builds up in the brake cylinder in direct response to a brake application command from the controlling locomotive and how long the pressure is retained. To gain insight into possible underlying factors that contributed to, or resulted in, a loss of braking control on the train, an extended brake cylinder leakage test was conducted on each of the 13 recovered cars. The test used a script based on available LER data (Table 8), to
62 Wheel blueing is discussed in more detail in section 1.19.1. 63 A standing brake test is a non-regulatory specialized test performed under specific operational requirements to verify the continued application of the air brakes on the cars for an extended period of time. 64 In North America, the allowable maximum air flow to qualify a train when using the brake pipe leakage method of testing is 5 psi/min.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 67 replicate the train handling actions taken by the LE while the train was descending Field Hill, including the emergency stop at Partridge. The results served to characterize the air brake performance of each of the recovered cars immediately prior to the emergency stop. Table 8. Test script used for assessing the cars’ air brake performance in cold-temperature extended brake leakage testing* Step Elapsed time Brake pipe reduction (psi) Brake pipe pressure (psi) 1 00:00:00 Minimum 84 2 00:07:44 8 82 3 00:08:29 10 80 4 00:17:30 12 78 5 00:18:14 14 76 6 00:18:48 15 75 7 00:19:18 17 73 8 00:19:29 19 71 9 00:19:44 21 69 10 00:19:50 Emergency 0
- The tests began with the air brake released and fully charged to 90 psi.
- 18.1.4.1 Service brake applications
At step 6 of the test script, from a fully charged brake pipe, i.e., 90 psi, a series of brake pipe pressure reductions totaling 15 psi had reduced brake pipe pressure to 75 psi. The measured average BCP for the 13 cars was 21 psi, or 57% of the theoretical maximum value of 38 psi (in the absence of brake cylinder leakage). The BCP on 5 of the cars (38% of the total number of cars) was between 0 psi and 10 psi. These cars essentially had ineffective air brakes during service applications. Six of the cars (46% of the total number of cars) did not respond as expected to the successive series of small incremental brake pipe pressure reductions and showed a lower than expected increase in BCP. The cars with reduced brake pressure would not be expected to have blueing on the wheel surface. Figure 21 shows how aggregated BCP from the test performed on 08 February 2019, at temperatures of −19 °C to −21 °C, changed over time. From the test measurements, the average BCP for the 13 recovered cars was calculated and plotted over a 20-minute timeframe (solid line in Figure 21). As reference, the theoretical maximum BCP baseline without leakage is shown as a dashed line.
TRANSPORTATION SAFETY BOARD OF CANADA 68 Figure 21. Aggregate brake cylinder pressure for all 13 cars from the 08 February 2019 service brake application test (Source: TSB)
- 18.1.4.2 Emergency brake application
All 13 cars responded to the emergency brake application with increased BCP. The test duration was 180 minutes. The average BCP started at 67 psi (87% of the theoretical maximum) and then declined to 47 psi at the end of the test. After 90 minutes, the average BCP was 69% of the emergency brake theoretical maximum. After 180 minutes, the average BCP was 61% of the emergency brake theoretical maximum, and 9 cars (69% of the total cars) had a BCP of at least 50 psi. Figure 22 shows how aggregated BCP from the test conducted on 08 February 2019 changed over time during the emergency brake application. This figure further extends the time duration expressed in Figure 21 from 20 minutes to 180 minutes (3 hours). From the test measurements, the average BCP for the 13 recovered cars was calculated and plotted.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 69 Figure 22. Aggregate brake cylinder pressure for all 13 cars from the 08 February 2019 emergency brake application test (Source: TSB)
- 18.1.5
Brake cylinder leakage test with retainer The FHOP require that the retainers be set to the HP position on at least 75% of loaded cars on a westbound freight train stopped in emergency beyond Mile 123.5 of the Laggan Subdivision. Setting retainers on a stationary train does not provide any additional brake retarding force while the train brakes remain applied. Rather, the retainers are intended to provide a residual amount of braking force after the train brakes are released. This may help hold the train in a stationary position or control the speed while the air brake system is being recharged. The HP setting is designed to nominally hold up to 20 psi of compressed air in the brake cylinder after the car air brake is released. In a situation where the cylinder pressure is less than 20 psi when the air brake is released, the retainer will initially hold whatever pressure existed at that time. During the tests performed outdoors in Banff, the leakage of compressed air from the car air brake cylinders was measured with the retainer set up to operate in the HP position. Brake cylinder leakage was measured after releasing an emergency brake application. At the end of the test (1 hour and 45 minutes), it was observed and recorded that: • 3 cars (23% of the total number of cars) had a BCP in the 18 to 20 psi range; • 3 cars (23% of the total number of cars) had a BCP in the 7 to 15 psi range;
TRANSPORTATION SAFETY BOARD OF CANADA 70 • 7 cars (54% of the total number of cars) had leaked down to 0 psi; and • the average residual BCP for the 13 cars was 50% or less of theoretical maximum (i.e., had leaked down to 10 psi or less.) 1.18.1.6 Cold-temperature automated single car test A cold-temperature ASCT was conducted on 25 February 2019 between 0230 and 0930. The ambient temperature decreased from −22 °C to −28 °C during that time. The test was performed on each of the 13 cars using an ASCT device. All 13 grain hopper cars failed the test; 12 cars failed because of excessive leakage (brake cylinder or CCV) and 1 car failed the “disconnect test” (receiver check valve leakage test). In a shop environment, a full AAR S-4027 ASCT would be sequentially followed until all test steps are successfully passed. However, this approach was not practical during the outdoor testing at Banff due to the extreme cold ambient temperatures and the lengthy time that would be involved to repair and retest. A car that did not fully complete a particular test step was considered to have failed the test. A failed test step is indicative of an issue with the air brake system but not necessarily a reduced braking effectiveness. The effect, for example, could be high leakage that will increase recharging time without necessarily having an adverse effect on braking performance. 1.18.1.7 Test of the dynamic brakes on the remote locomotives Tests were performed on the recovered tail-end locomotive (CEFX 1040) to verify the operational characteristics of the DP system and confirm how the system regulated the brake retarding force produced by the locomotive’s DB and the independent brake in response to an emergency brake application. The tests confirmed that, because the locomotive was set up for DP remote operation on the occurrence train, it would have lost DB control after the emergency brake application, and its independent brake would have been regulated to a maximum of 45 psi. This was the expected behaviour: • On older DP systems, DB holding is not functionally available on remotely controlled locomotives that are linked to the lead DP locomotive via DP radio communication. • Regulating the independent brake to a maximum of 45 psi on DP remote locomotives in response to an emergency brake application is a legacy design characteristic of the DP system, intended to avoid thermal-mechanical damage to the locomotive wheels. These test results, while expected, confirmed an important safety detail: when the train stopped in emergency at Partridge, it lost the DB retarding force that had been available on the 2 DP remote locomotives, UP 5359 and CEFX 1040. This amounted to a loss of about 98 000 pounds of DB retarding force per locomotive, or 196 000 pounds in total.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 71 1.18.2 Shop-conducted testing 1.18.2.1 Automated single car test Additional testing on the 13 recovered cars was conducted at the CP maintenance shop in Port Coquitlam, BC, from 07 May to 08 May 2019. Each car was given a full ASCT while at ambient temperature within the shop. Test results indicate that 6 cars (45% of the total number of cars) failed the ASCT: 3 cars failed the parts of the test that would result in reduced braking performance, while the other 3 cars failed the parts of the test that would have no influence on the braking performance. By cross-referencing these ASCT results with wheel temperature data collected prior to the occurrence, the investigation determined that 2 of the cars that failed the ASCT also had cold wheels, indicating that the brake system response on these cars was ineffective. The other cars that failed the ASCT did not have a record of cold wheels. One car showed marginal cold wheels at the detector located at Mile 111.7 of the Mountain Subdivision, but it did pass the ASCT.65 This result indicates the car had brake cylinder leakage that was less than the failure threshold of 1 psi/minute. However, a brake cylinder leakage rate of less than 1.0 psi/min would still result in reduced brake effectiveness if a brake application was held over an extended period. 1.18.2.2 Brake cylinder leakage tests In addition to the ASCTs, the 13 recovered cars were also tested for brake cylinder leakage during extended periods of time. These tests were conducted to see if the cars had a lower- than-condemnable level of brake cylinder leakage, which could still result in loss of brake effectiveness when brakes on the occurrence train were left applied for an extended period. The extended brake cylinder leakage tests were conducted to emulate the in-service train brake applications for the occurrence train cars and monitor their brake cylinder leakage rates over an extended period, under normal shop environment temperature range. During the extended brake cylinder leakage tests, the brakes on 1 car did not apply, and could not be tested further. This same car also showed cold wheels when descending Field Hill after the accident, while en route from Banff to Port Coquitlam. Four other cars showed various levels of leakage during the retainer tests, losing 40% of the BCP in 6 minutes. These 4 cars did not show any cold wheel while en route to Port Coquitlam. However, their leakages, caused at the retainer piping or brake cylinder level, would have had a negative impact on the BCP retention, resulting in ineffective retainers.
65 According to the AAR S-486 SCT procedure, brake cylinder leakage is to be monitored during 1 minute, and the fail threshold is 1 psi/minute.
TRANSPORTATION SAFETY BOARD OF CANADA 72 1.19 Brake efficiency based on wheel data Insight into the train’s brake efficiency before the derailment can be obtained from an examination of the train’s wheels and from a review of wheel temperature data. 1.19.1 Wheel examination The wheels recovered from the occurrence site were examined for tread blueing. Tread blueing on railway wheels, which is caused by the frictional heat generated during a heavy or extended brake application, can be used as a qualitative measure to indicate the relative braking force applied to each wheel. The absence of blueing indicates inoperative or ineffective brakes.66 Overall, 724 of the 932 wheels (78% of the total) from the train were examined for blueing. An evaluation of the level of blueing and the percentage of wheel tread blued was conducted using the following scale: • 0 (None) (Figure 23) • 1 (Very light) • 2 (Light) • 3 (Medium) • 4 (Heavy) • 5 (Very heavy) (Figure 24)
66 A freight train shall operate with no less than eighty-five (85) percent of the train brakes operative (Transport Canada, Railway Freight and Passenger Train Brake Inspection and Safety Rules [17 November 2017], Part I: General, section 7.1, p 7). ”Operative” means a brake that applies as well as releases and is in a suitable condition to retard and/or stop equipment.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 73 Figure 23. Wheel tread with no blueing (Source: TSB)
Figure 24. Wheel tread with very heavy blueing (Source: TSB)
Figure 25 compares the blueing distribution of the car wheels with the blueing of the locomotive wheels. While the car blueing distribution is skewed to the left (less effective car brakes), the locomotive blueing distribution has a bell shape slightly skewed to the right, suggesting that most of the brakes were operative. Roughly 41% of the examined car wheels did not have any indication of blueing while 11% had very light blueing. Approximately 9% of the car wheels showed heavy or very heavy blueing. In contrast to the wheels on the cars, the majority of the wheels on the locomotive, almost 64%, had medium, heavy, or very heavy blueing; less than 6% did not have any indication of blueing. High levels of blueing on locomotives can be attributed to the locomotive BCP, which is maintained directly from the locomotive main reservoir whenever the locomotive brakes are applied. When compared to the DP lead locomotive, the 2 DP remote locomotives had less blueing on the wheels, as expected; this is because on the remote locomotives, BCP was being limited to a maximum of 45 psi after the emergency brake application (as opposed to 72 psi for the lead locomotive).
TRANSPORTATION SAFETY BOARD OF CANADA 74 Figure 25. Blueing level of examined wheels, comparing locomotives to cars (Source: TSB) The serial numbers were collected from the inside hub of each set of wheels and were cross- referenced with the car numbers and axle position of each examined wheelset. Figure 26 shows the level of blueing of the wheels on each car and locomotive in the train. The shade of blue depicts the level of blueing observed; no data were available for the cars in yellow. Data were not available for all of the car wheels; therefore, an average value (per car) was used in all cases. Blueing levels tended to be random throughout the train. There were 35 grain cars that had wheels showing no blueing or blueing level 1 (very light blueing). Figure 26. Pictorial representation of blueing on the occurrence train* (Source: TSB)
- The blueing scale on this image is 0 to 3.9 instead of 0 to 5 because the number for each car is the average
of all the wheels examined on that car.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 75 1.19.2 Wheel temperature data The wheel temperature on a car is directly related to the brake shoe retarding force; therefore, it can be used to evaluate brake health. It also serves as a relative measure of braking efficiency when compared to other cars on the same train. Under sustained application of the train air brakes, such as on a long descending grade, the temperature of the wheels will increase significantly above the ambient temperature. Theoretically, similar cars under similar conditions would exhibit similar wheel temperatures. However, cars providing effective brake force will show elevated wheel temperatures, while those with ineffective brake force would have substantially colder wheel temperatures relative to other wheels on the train. Wheel temperature data are recorded by wheel temperature detectors (WTD), also known as cold wheel detectors. WTDs use infrared sensor technology to assess the wheel temperatures of passing trains that have been subjected to very recent braking conditions. They flag wheels that are relatively cold compared to train average wheel temperatures. Sites equipped with WTDs are connected to a communication network, to allow the inspection data from a passing train to be automatically transmitted and stored electronically at a centralized location where they can be analyzed later using automated analysis algorithms. 1.19.2.1 Canadian Pacific’s wheel temperature detectors between Calgary and Vancouver Initially, wheel temperature data were captured at CP to ensure that air brakes were properly released to prevent excessively high wheel temperatures, which could lead to a wheel failure. However, since October 2008, CP has been using WTDs at selected wayside inspection sites to detect cold wheels and to provide a performance-based assessment of car braking on loaded unit coal trains operating in the BC coal loop. Although car wheel temperature on coal trains was the initial focus for utilizing WTD technology, the wheel temperature data for all trains passing by a WTD are captured. Scanned wheel temperatures are matched to specific car numbers. CP has 5 WTD sites on mountain grade between Calgary and Vancouver—1 on the Laggan Subdivision at Mile 130.2 and 4 on the Mountain Subdivision: Mile 14.2, Mile 30.2, Mile 95.1, and Mile 111.7. 1.19.2.2 Previous recorded temperature measurements for the occurrence cars Normally, the wheel temperatures for all 112 cars on the train would have been measured when it passed by the detector located on the Laggan Subdivision at Mile 130.2. However, data were not collected at that WTD for any of the cars on the day of the occurrence because a power outage had rendered it inoperative. As an alternative source of data, the temperature record was obtained for each of the occurrence train’s 112 cars on their previous loaded trip west to Vancouver. The cars had last been scanned while they were being moved on 1 of 3 separate westbound loaded unit grain trains that had passed by the detectors at Mile 95.1 and Mile 111.7 on the Mountain Subdivision during the last 2 weeks of January 2019 (Table 9). When the WTD
TRANSPORTATION SAFETY BOARD OF CANADA 76 measurements were taken the local ambient temperature ranged from −0.5 °C to −3.9 °C— considerably different from the colder ambient temperatures to which the occurrence train was exposed. Table 9. Breakdown of wheel temperature detector data obtained from 3 westbound unit grain trains from the last 2 weeks of January 2019 Scan date Scan time (Pacific Standard Time) Ambient temperature (°C) Number of occurrence cars Mile 95.1 Mile 111.7 Difference 2019-01-18 1304 1350 46 minutes −0.8 to −1.2 28 2019-01-19 2313 2355 41 minutes −0.5 to −0.6 12 2019-01-21 1032 1113 41 minutes −3.2 to −3.9 72 The data contained individual wheel temperature measurements for all 8 wheels on each of the 112 cars (896 wheels in total).67 While a train is in motion with its air brakes released, the car wheels will typically have a temperature of 35 °F to 50 °F above ambient, due to the friction heat generated by the effects of wheel-rail contact and rolling resistance. When the train’s brakes are applied, the temperature of the car wheels are expected to increase significantly. Wheels that do not contribute to the car’s braking effort remain cold when the brakes are applied; cold wheels are therefore an indication of reduced brake efficiency. A single cold wheel on a car may not necessarily mean that the overall braking performance on that car has been greatly affected. However, the greater the number of cold wheels in a dataset, the greater the likelihood that any given car may have several cold wheels, thus a lower average wheel temperature and a degradation in braking effectiveness. The number and percentage of cold wheels for the cars on the train were calculated using the data collected at the Mile 111.7 site during the last 2 weeks of January. For this purpose, individual wheels were considered to be cold if their temperature was less than or equal to 70 °F. While a different temperature threshold could have been selected, 70 °F is a reasonable characterization of a categorically cold wheel. In addition, at the time of the occurrence, CP was also using 70 °F to identify cold wheels on coal trains. Based on these calculations, 123 of the wheels (14% of the total 896 wheels) were cold. The measured temperature for the wheels can be used to further analyze the WTD temperature data, to evaluate overall brake efficiency of the rail cars on the train. In order to depict the entire braking performance of the train, a comprehensive characterization of car temperature data (average of all 8 wheels) using a ranking with several temperature thresholds is required. A ranking system such as the one shown in Table 10 allows the
67 Although 2 of the cars on the train had their air brakes cut out, these 2 cars had operative air brakes during their previous loaded trip west to Vancouver. The cars were included in the statistical analysis because meaningful wheel temperature data were available for them and the additional data points were representative of the general braking performance of the occurrence train.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 77 integration of additional criteria and provides a more complete picture of the braking behaviour of the 112 cars.68 Table 10. Car average temperature ranking criteria Ranking Temperature threshold (°F) Adequate Greater than 150 Marginal From 100 to 150 Cold Less than 100 Cars providing effective brake force will show elevated wheels temperatures while those with ineffective brake force would have substantially colder wheel temperatures relative to the majority of other wheels on the train. Using data obtained from the WTD at Mile 111.7, Figure 27 shows the average temperature for each of the 112 cars on the train from the head end (left) to the tail end (right). The cars are shown in different colours based on their average temperature, to reflect their respective ranking in terms of brake effectiveness. As the figure illustrates, there were significant differences in car temperature, and several of the cars had an average well below 100 °F, a clear indication that their brakes were either ineffective or completely inoperative.
68 The temperature thresholds for this ranking system are based on wheel temperature data from grain trains that operated on the Mountain Subdivision. In this system, a temperature of 150 °F and higher is considered adequate, and corresponds to the average wheel temperature for grain trains.
TRANSPORTATION SAFETY BOARD OF CANADA 78 Figure 27. Average car temperature for the 112 cars on the train, based on data from the wheel temperature detector at Mile 111.7 (Source: TSB)
- Cars in position 27 and 101 had their brakes cut out on the day of the occurrence, and therefore did not contribute to the
train’s braking capacity. ** The average car temperatures conveyed in the figure are based on warmer ambient temperatures than on the day of the occurrence. Table 11 shows the number and percentage of cars and the average temperature69 in the 3 different ranking groups. At the Mile 111.7 detector, 60% of cars had adequate braking, 22% had marginal braking performance, and 18% had inoperative braking systems. Table 11. Car average temperature ranking at the Mile 95.1 and Mile 111.7 detectors Ranking Mile 95.1 detector Mile 111.7 detector Number and percentage of cars Average temperature (°F) Number and percentage of cars Average temperature (°F) Adequate 58 (52%) 201 67 (60%) 201 Marginal 31 (28%) 128 25 (22%) 131 Cold 23 (21%) 49 20 (18%) 55 The car identification markings were used to segment the 112 cars into their fleet of origin. Table 12 presents the car average temperature distribution for all 112 cars segmented by
69 Average temperature of all the 8 wheel positions.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 79 car fleet. The SOO fleet, equipped primarily with a body-mounted brake system, shows the overall highest average car temperature and the largest percentage of cars with a ranking of adequate. Table 12. Car average temperature distribution for all 112 cars, by car fleet, based on data from the wheel temperature detector at Mile 111.7 Car fleet Car count Average temperature (°F) Standard deviation Number and percentage of cars by car average temperature ranking Adequate Marginal Cold SOO 51 175.1 67.2 37 (73%) 6 (12%) 8 (16%) Leased 21 153.6 61.8 11 (52%) 6 (29%) 4 (19%) CP* 40 141.7 52.3 19 (48%) 13 (33%) 8 (20%) Totals 112 159.2 62.7 67 (60%) 25 (22%) 20 (18%)
- 2 cars in the CP 384000-384999 series and 38 Government of Canada cars in the CP 600000–608591 series
Table 13 compares the braking efficiency of the 13 cars recovered from the accident site to the 99 derailed cars. The table illustrates the number and percentage of cars for the 3 different ranking groups based on the data from the WTD at Mile 111.7. In terms of the percentage of cars, 69% of the 13 recovered cars were ranked as having adequate braking compared to 59% for the 99 derailed cars. Table 13. Number and percentage of cars in each car average temperature ranking for the 13 recovered cars and the 99 derailed cars, based on data from the wheel temperature detector at Mile 111.7 Car average temperature ranking 99 derailed cars (%) 13 recovered cars (%) Total cars (%) Adequate 58 (59%) 9 (69%) 67 (60%) Marginal 23 (23%) 2 (15%) 25 (22%) Cold 18 (18%) 2 (15%) 20 (18%) 1.19.2.3 Cold cars on preceding unit grain trains Between 01 February and 03 February 2019, 5 westbound loaded unit grain trains passed by the WTD located at Mile 130.2 of the Laggan Subdivision. The relief LE operated one of these trains as recently as the day before the accident and had completed a safety hazard report indicating the need for using a heavier brake application than usual to control train speed. The wheel temperature data for these trains are listed in Table 14. A significant percentage of cold cars were detected on the trains. The percentage of cold cars climbed from 22% to 56% when the outside temperature dropped from −2.8 °C to −25.6 °C.
TRANSPORTATION SAFETY BOARD OF CANADA 80 Table 14. Data from wheel temperature detectors for 5 prior westbound grain trains, 01 to 03 February 2019 Date Time Ambient temperature (°C) Train Speed (mph) Number of locomotives Cars Average wheel temperature (°F) Number of cold cars (%) 2019-02-01 2106 −2.8 301-296 8 3 114 209.9 25 (22%) 2019-02-02 1339 −2.2 303-578 13 3 112 238.5 28 (25%) 2019-02-02 1931 −17.8 301-436 10 3 108 160.8 49 (45%) 2019-02-03 1037 −25.6 303-676 14 3 110 133.7 62 (56%) 2019-02-03 1103 −25.6 303-698 11 3 111 157.0 61 (55%) 1.19.3 Automated train brake effectiveness study In 2008, CP began an automated train brake effectiveness (ATBE) study as a means of exploring ways of using WTD technology to identify cars with ineffective brakes on trains in its closed-loop coal service. The work done by CP to use detectors to identify cars with brake system issues was novel in the industry at the time. The system looks at all the train wheels under braking conditions, identifies the normal range of temperature for the cars, and then flags those cars that deviate from the normal range, both hot and cold wheels. These cars are then inspected for stuck or ineffective brakes. CP coal trains originate in south-eastern BC and travel north to Golden, BC, located around Mile 35 on the Mountain Subdivision. From Golden, trains travel westward and CP used the WTDs at Mile 95.1 and Mile 111.7 on the Mountain Subdivision for this study (Figure 28).
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 81 Figure 28. Mountain Subdivision wheel temperature detector sites used in the automated brake effectiveness study on coal trains (Source: A. Aronian, M. Jamieson, and K. Wachs, “Automated Train Brake Effectiveness Test Process at Canadian Pacific”, proceedings of the ASME/ASCE/IEEE 2012 joint rail conference, Philadelphia, Pennsylvania [17-19 April 2012])
Note: Detector sites at Mile 95.1 and Mile 111.7 (denoted by H) have both hot box detector and hot wheel detector capability. On the Mountain Subdivision, the train air brakes will initially be applied to control train speed around Mile 89 and the car wheel temperatures will start to increase. By the time a train passes by the Mile 95.1 detector, the brakes will have remained applied for about 20 minutes and the wheel temperatures will have stabilized. The Mile 111.7 detector site is located about 16.6 miles further away, at which point the air brakes will have remained applied for an additional 40 to 45 minutes. Overall, a train will normally have the air brakes applied for well over one hour while descending the 20 miles of sustained mountain grade. In 2011, CP received an exemption from TC to test its ATBE technology within its closed- loop coal operations in Canada.70 The technology allowed more timely and targeted maintenance practices, which contributed to an overall improvement of coal train air brake performance. In 2015, TC, the National Research Council of Canada (NRC) and CP initiated a joint research project to assess ATBE as an alternative to or in combination with the No. 1 brake test. The ATBE research examined wheel temperature data from a series of WTDs located at the bottom of long descending grades, where prolonged air brake applications are required to control train speed. A preliminary scoping study71 was conducted to test whether the NRC could replicate CP’s coal fleet results using the same datasets, and to test the methodology on other bulk
70 Minister of Transport, Notice of exemption pursuant to section 22 of the Railway Safety Act, chapter R-42 (17 June 2011). 71 National Research Council of Canada, Preliminary Analysis of CP Wheel Temperature Data and Test Plan (15 July 2016).
TRANSPORTATION SAFETY BOARD OF CANADA 82 commodity train types: potash and grain unit trains. Average car temperature readings (the average temperature of the 8 wheels on a car) for the coal and potash trains showed similar clustering of temperature data. The grain unit train data showed a lower average temperature and greater temperature variation (Figure 29), mostly due to the disparities between the cars (braking system type, age, etc.). Figure 29. Temperature distribution for potash, coal and grain unit trains (Source: National Research Council of Canada)
In 2016, preliminary research72 results showed that, compared with other car types, the grain cars had a higher number of cold wheels while braking. Subsequently, as part of an independent research initiative, a comparison of ATBE data and No. 1 brake test results was conducted on a sample of 44 grain trains, each with an average of 112 rail cars per train. ATBE testing identified 695 cars with inoperative brakes (14% defect rate) while the No. 1 brake test identified 5 cars (0.1% defect rate). A random sampling of 14 of the cars identified by the ATBE testing was sent for an ASCT and inspection. All of the cars in the sample that were identified with ineffective brakes by the ATBE method failed the ASCT. The final ATBE report was issued by the NRC on 04 October 2018.73
72 Ibid. 73 National Research Council of Canada, Automated Test Brake Effectiveness (ATBE) Test Technology Demonstration and Assessment (04 October 2018).
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 83 1.19.3.1 Applying the automated train brake effectiveness methodology to grain trains At the time of the occurrence, CP had a waiver from TC authorizing the use of ATBE to assess the effectiveness of the brakes, which was applicable to the coal fleet exclusively. Therefore, there were no formalized criteria to set specific thresholds for identifying grain cars that deviate from the normal range of wheel temperature. Consequently, a slightly different approach was required to assess and categorize the wheel temperature data for the cars on the occurrence train. Coal cars and grain cars are similar in terms of loaded weight and braking characteristics. For instance, on the occurrence train, each loaded grain car weighed 129 tons on average, while a loaded coal car weighs about 143 tons on average, a difference of only 10%. The tons per operative brake characteristics of the occurrence train were also quite similar to a typical loaded coal train. These similarities provided the rationale for adapting the coal train ATBE methodology to grain cars. The ATBE methodology uses train average temperature and standard deviation (SD)74 as criteria to identify cold cars. Therefore, these values were calculated for the 112 cars on the train based on WTD data collected at Mile 95.1 and Mile 111.7 in the last 2 weeks of January 2019 (Table 15). Table 15. Highest, lowest, and average car temperatures, with standard deviation, of the 112 cars on the occurrence train at Mile 95.1 and Mile 111.7 in the last 2 weeks of January 2019 Wheel temperature detector site Car temperature (°F) Highest Lowest Average Standard deviation Mile 95.1 295.3 26.3 149.7 65.7 Mile 111.7 283.8 23.0 159.2 62.7 In terms of overall air brake performance of a train, the most representative metrics in Table 15 are the overall average temperature and the SD. The average temperature and the SD values need to be correlated with values that are considered to represent acceptable braking performance for the conditions under which the data were obtained. Typically, train-specific results would be compared and ranked against a large representative baseline sample population of similar trains. However, there were no ATBE data for grain cars, and hence data from coal trains were used. As shown in Table 15, an average temperature of 159.2 °F and an SD of 62.7 °F were obtained at the detector site at Mile 111.7 of the Mountain Subdivision. In comparison, WTD
74 Standard deviation is a measure of the spread or variation of the data from the mean (average value). When data are more homogenous (less variation and more bunched and closely fit to the average), the standard deviation is smaller.
TRANSPORTATION SAFETY BOARD OF CANADA 84 data presented in the ATBE paper75 showed an average wheel temperature of 242 °F and an SD of 50 °F for loaded coal trains going over the same detector. The ATBE rules at CP considered a coal car to have ineffective brakes if the temperature of one wheel was less than or equal to • 70 °F, and • 3 SDs from the overall average wheel temperature for the train. However, the criterion of less than 3 SDs would give a negative threshold value in the case of the cars that comprised the occurrence train, due to the low average car temperatures and the large spread of temperatures between cars, as compared to the WTD data for coal trains. Consequently, for the purposes of this investigation, a car average temperature threshold of 1.5 SDs from the average is more meaningful and provides reasonable representation of the braking performance. The use of 1.5 SDs is one of the methods recommended by the NRC in its preliminary scoping study of ATBE. For the occurrence train, 1.5 SDs from the overall average wheel temperature corresponds to 65.2 °F. Using the modified criteria (70 °F and 1.5 SDs), the analysis of the entire temperature dataset collected at the Mile 111.7 site determined that 111 wheels (12% of the total 896 wheels) were cold. Figure 30 is a histogram of the wheel distribution by temperature range for all 896 wheels, based on data obtained from the WTD at Mile 111.7 of the Mountain Subdivision. The large double-headed arrow shows the band of temperatures that are within 1.5 SDs (i.e., 94.1 °F) on either side of the average wheel temperature (i.e., 159.2 °F). In this figure, wheels below 80 °F (145 wheels) are shown in the dashed rectangular box on the left. Of these, 111 met the criteria for cold wheels (less than 70 °F and 1.5 SDs, i.e., 65.2 °F).
75 A. Aronian, M. Jamieson, and K. Wachs, “Automated Train Brake Effectiveness Test Process at Canadian Pacific”, proceedings of the ASME/ASCE/IEEE 2012 joint rail conference, Philadelphia, Pennsylvania, 17-19 April 2012.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 85 Figure 30. Wheel distribution by temperature range for the cars on the occurrence train, based on the data obtained from the detector at Mile 111.7 (Source: TSB)
- 20
Brake shoe friction fade The investigation considered the possibility of brake shoe friction fade playing a role in the occurrence. The friction between the brake shoe and the wheel tread is critical to maintaining the required brake retarding force. The brake shoe coefficient of friction depends on several factors such as shoe surface condition, the rotational speed of the wheel, applied braking force, and duration of the brake application. Contaminants such as snow and ice can reduce the coefficient of friction. Brake shoe friction fade, also known as friction fade, can also alter this coefficient of friction, resulting in a degradation of retarding force. When the automatic brake is applied, heat is generated at the brake shoe/wheel tread interface. The amount of heat generated is proportional to brake horsepower (BHP),76 which itself is proportional to speed and brake retarding force. Heavier cars need a higher retarding force for speed control when descending grades and therefore generate higher temperatures and are exposed to higher BHP. When the thermal capacity of a brake shoe is exceeded for a sufficient length of time, the coefficient of friction may be lowered and friction fade may occur. When excessive heat build-up occurs, the coefficient of friction between a brake shoe and the wheel tread is lowered, leading to a significant loss of brake retarding force. Studies have shown that
76 Brake horsepower equals the retarding force times speed, divided by 375. The retarding force is expressed in pounds and the speed in mph.
TRANSPORTATION SAFETY BOARD OF CANADA 86 friction fade does not occur on 36-inch-diameter wheels, such as the wheels on the occurrence train, when BHP is 30 or less.77 1.20.1 Friction fade on the train From Stephen (where the initial brake pipe reduction occurred) to the emergency application of the brakes, the speed of the train varied from 8 mph to 21 mph. Using the brake retarding force of 409 550 pounds calculated in section 1.15, and given a speed varying from 8 mph to 21 mph, the resulting BHP would have been between 10 and 26. Therefore, brake shoe friction fade was not likely a factor while bringing the train to a stop. However, during the uncontrolled movement, the train accelerated to 53 mph. On those cars with effective brakes, the conditions necessary for friction fade would have existed: at this speed, the BHP would have exceeded 30 and could have reached as high as 67. 1.20.1.1 Speed profiles for the mid-train and tail-end locomotives To further assess the impact of friction fade and how it contributed to the high rate of speed reached by the uncontrolled movement, the LER speed data were analyzed. The data represent the actual performance of the occurrence train in response to all of the specific operating conditions and dynamic variables acting on the train. From the time the train started to roll on its own with the train brakes applied in emergency, up to when it derailed at a speed of about 53 mph, about 8.5 minutes elapsed. Figure 31 shows the LER speed profile plotted over this time period for the DP mid-train locomotive (UP 5359) and for the DP rear locomotive (CEFX 1040). The data from CEFX 1040 show that the speed of the rear locomotive dropped rapidly from about 48 mph to 0 mph when the rear portion of the train derailed. The data from UP 5359 show that, about 23 seconds later, the speed of the mid-train locomotive dropped rapidly from 53 mph to 0 mph as the middle portion of the train derailed. The data from the UP 5359 are shown as a stepped line because the LER captured speed as an integer value, whereas the CEFX 1040 LER captured speed to 1 decimal point.
77 D. Chen, “Analysis of Brake Failure and Runaway Accidents in Mountain Terrain in Canada,” Proceedings of the 2013 ASME Joint Rail Conference, Knoxville, TN, Report No. JRC2013-2402.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 87 Figure 31. Speed profiles from the locomotive event recorder for the mid-train locomotive (UP 5359) and rear locomotive (CEFX 1040) during the uncontrolled movement (Source: TSB) 1.20.1.2 Friction fade for various accelerations There are 3 key fundamental variables that significantly influence train speed during an uncontrolled movement: net grade force, net BCP, and brake shoe coefficient of friction. If the coefficient of friction degrades due to friction fade, the acceleration of the train will increase in proportion to the change in friction. A close examination of the speed data shown in the graph above indicates that the rate of change in speed did not remain constant throughout the uncontrolled movement. To quantify this, 3 speed ranges were identified that each had a similar characteristic related to the rate of change in speed. For each range of speeds, an average acceleration in mph/min was calculated to determine how the acceleration changed during the uncontrolled movement. The results indicate 3 distinct changes in acceleration occurred, each specific to a range of speeds. Table 16 shows the 3 speed ranges and the calculated average acceleration of each speed range.
TRANSPORTATION SAFETY BOARD OF CANADA 88 Table 16. Calculated accelerations for the 3 speed ranges that occurred during the uncontrolled movement (Source: TSB) Speed range (mph) Duration Acceleration (mph/min) 0.0 to 6.1 2 mins 1 sec 3.3 6.1 to 19.1 2 mins 23 secs 5.5 19.1 to 53.0 4 mins 2 secs 8.0 The 3 accelerations are illustrated in Figure 32 as 3 trend lines superimposed on the speed plots from Figure 31. Figure 32. Trend lines for the 3 distinct accelerations during the uncontrolled movement (Source: TSB) The trend lines are labeled 1 to 3 and indicate a higher acceleration with increasing trend line number: • Trend line 1 illustrates that the train had a constant acceleration of 3.3 mph/min during the first 2 minutes and 1 second while the speed increased from 0.0 mph to 6.1 mph. Throughout this speed range, a higher brake shoe friction is inherently expected. Thus, the acceleration trend line is not as steep as it is for trend line 2. • Trend line 2 illustrates that the acceleration remained constant at 5.5 mph/min during the next 2 minutes and 23 seconds while the speed increased from 6.1 mph to 19.1 mph. In this speed range, the initial amount of brake shoe friction will decrease and, in the absence of friction fade, is normally expected to start levelling out and gradually reach a near constant amount of friction.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 89 • Trend line 3 illustrates that the acceleration remained constant at 8.0 mph/min during the last 4 minutes and 2 seconds while the speed increased significantly from 19.1 mph to 53 mph, at which point the lead locomotive derailed. During this time, the wheel tread surface and brake shoe temperatures would have quickly increased, and continued to increase (on the cars that were providing a high brake shoe force, i.e., the cars with a BCP of 50 psi or more), creating the conditions that lead to friction fade. The analysis results, in summary, show that friction fade would not have been a significant factor in the first 4.5 minutes during which the speed of the uncontrolled movement increased from 0 mph to 20 mph. However, once the speed of the uncontrolled movement reached about 20 mph, a significant (45%) increase in acceleration is evident, represented by the difference in trend lines 2 and 3. The faster rate of change in speed above 20 mph, acceleration trend line 3, is attributable to friction fade. 1.20.1.3 Calculated speeds for the train with and without friction fade Additional analysis was done to estimate the speed trajectory that the uncontrolled movement would have followed had friction fade not occurred. The investigation determined that the head-end portion of the occurrence train derailed within a few seconds after the mid-train portion. Thus, the maximum speed attained on the lead locomotive would have been similar to the maximum speed of the mid-train locomotive. Therefore, the LER speed and distance data from the mid-train locomotive was used as surrogate data to determine the speed of the lead locomotive from the time the train started to roll on its own, up to when it derailed at a speed of about 53 mph. Additionally, the theoretical speed of the train without friction fade, from 19.1 to 53 mph, was extrapolated by using the average acceleration of 5.5 mph/min calculated for the pre- fade speed range of 6.1 mph to 19.1 mph and applying it to the friction fade range. Figure 33 shows speed versus distance plots for the lead locomotive with, and without, friction fade. The values for the actual speed and distance traveled were captured by the UP 5359 LER, but with the distance offset by 3349 feet to represent the actual location of the lead locomotive in the train (instead of the mid-train locomotive). As the figure illustrates: • In this occurrence, the lead locomotive attained the maximum speed of 53 mph just before arriving at the Kicking Horse River bridge; friction fade was present and the train was accelerating at 8.0 mph/min. • Had friction fade not been present, the increase in speed would have occurred at the slower rate of 5.5 mph/min, and the train’s speed at the Kicking Horse River bridge would have been 44.4 mph, a reduction of 8.6 mph.
TRANSPORTATION SAFETY BOARD OF CANADA 90 Figure 33. Calculated speeds for lead locomotive with and without friction fade (Source: TSB)
TSB calculations determined that the theoretical tip-over speed threshold on a 10° curve for a locomotive would be about 53.9 mph. In the 02 December 1997 occurrence in which CP grain train No. 353-946 rolled uncontrolled at high speed on Field Hill, the 2 head-end locomotives and first car successfully negotiated the 9° curve at Mile 134.4 while travelling at about 47 mph.78 1.21 Car control valve malfunction in extreme cold temperatures CCVs respond to decreases and increases in brake pipe pressure by applying and releasing/recharging the brakes of the cars they control. They are composed of 2 portions— a service portion and an emergency portion—as well as the pipe bracket where the portions are connected. In extreme cold environments, the internal rubber gaskets and O-rings of the CCV can shrink, resulting in air leakage. Rubber components on older CCVs are especially susceptible to leaks in extreme cold temperatures. 1.21.1 Worn rubber seals Teardowns and testing of selected service (NYAB DB-10) and emergency (NYAB DB-20 and Wabtec) portions from the January 2018 loss of control occurrence on CN’s Luscar
78 TSB Railway Investigation Report R97C0147.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 91 Industrial Spur79 showed that worn and deteriorated rubber seals resulted in excessive leakage from the CCVs during extreme cold temperatures. The leakage resulted in the valves malfunctioning in response to service and emergency brake applications. These situations would only occur at extremely low operating temperatures. ASCTs conducted before the occurrence on those service portions during periodic testing and maintenance at temperatures above 4.4 °C (40 °F) had not identified valves that needed to be removed from service due to this condition. 1.21.2 DB-10 car control valves: Association of American Railroads circular letter In 2013, NYAB investigated concerns regarding malfunction of the DB-10 service portion during brake applications in extreme cold ambient temperatures. The results of the investigation were issued in NYAB General Letter GL-490, Cold Temperature DB-10 Auxiliary Reservoir Leakage, dated 09 September 2013.80 The letter was distributed to the rail industry by the AAR through Maintenance Advisory MA-143 (Circular Letter C-12027) on 25 October 2013. The circular is provided in Appendix F. The NYAB general letter described a condition characterized by increased brake pipe air flow and auxiliary reservoir leakage after applying the brakes. The increased air flow was caused by leakage from the bottom cover exhaust port of the DB-10 service portion due to a worn rubber seal (Figure 34). Figure 34. Bottom view of DB-10 service portion showing the bottom cover exhaust port (Source: New York Air Brake)
The following elements were outlined in the letter: • Individual cars with excess leakage from the CCV might not be able to maintain a service brake application (potentially resulting in an undesired release).
79 TSB Rail Transportation Safety Investigation Report R18E0007. 80 New York Air Brake General Letter (GL) 490, Cold Temperature DB-10 Auxiliary Reservoir Leakage, Issue 01 (09 September 2013).
TRANSPORTATION SAFETY BOARD OF CANADA 92 • The excess air flow may result in increased brake application on the rear portion of the train and result in dragging brakes. • SCTs conducted at temperatures above 40 °F (4.4 °C) will not identify valves that need to be removed from service due to this condition. • DB-10 CCV portions subject to high vibration in high-mileage service may develop low-temperature leakage at some point in time above 13 years of age. • Trains experiencing high air flow with the brakes applied should be inspected for the presence of suspect DB-10 service portions. On 01 November 2018, NYAB issued General Letter GL-49003 to reinforce the message presented in GL-490 and to include DB-20 emergency portions. The following revised corrective actions were recommended:81 • Any DB-10 service portion experiencing one or more of the described symptoms should be removed from service as soon as practical and refurbished per NYAB Maintenance Specification NYR-332. • In addition, any DB-20 emergency portion partnered with the above removed DB-10 service portion that is original equipment manufacturer (OEM)/“clean, oil, test and stencil” (COT&S) date-coded the same age, is older or has no legible date code should be removed. 1.21.2.1 Canadian Pacific Bulletin CPSB048-13 After the distribution of NYAB General Letter GL-490 by the AAR through Maintenance Advisory MA-143 (Circular Letter C-12027), CP issued Bulletin CPSB048-13 in November 2013 as a maintenance advisory to train operations staff (Appendix G). The 1- page bulletin described functional behaviour related to specific control valve types in cold operations, with a discussion of symptoms and effects, stating in part, while enroute, should the Locomotive Engineer notice an increase in flow during a brake application, the crew must advise the RTC. The RTC will notify the Mechanical desk in the Operations Centre, who will arrange for an inspection of the train at a suitable Mechanical location.82 Bulletin CPSB048-13 was rescinded in 2014 as it had been issued to the crews for information purposes and it was not deemed necessary to reissue it or include its contents in the monthly operating bulletin indefinitely. CP still expected LEs to monitor brake pipe air flow regularly; however, they were no longer required to report applied air flow events to the RTC. 1.21.3 Weeper port issues on DB-10 service portions Brake pipe leakage has a strong effect on the overall performance of train brake application signal propagation. For the brakes to apply, the brake pipe must be reduced by 1.5 to 2 psi
81 New York Air Brake, General Letter (GL) 49003, Cold Temperature DB-10 & DB-20 Auxiliary Reservoir, Issue 03 (01 November 2018). 82 Canadian Pacific, System Bulletin CPSB048-13 (18 November 2013).
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 93 below the auxiliary reservoir pressure. The brake pipe pressure drop must be sufficiently rapid and of sufficient magnitude to overcome the stabilizing effect of the weeper port. The weeper port is a very tiny passage in the service portion that connects the brake pipe to the auxiliary reservoir. It provides stability to prevent normal fluctuations and gradual changes in brake pipe pressure from triggering an undesired brake release. Furthermore, the brake pipe pressure reduction must generate a steady and appreciable pressure differential for it to be sensed by the CCV. Modern electronic air brake systems on freight locomotives have made it possible to implement and control brake pipe reductions to within 1 to 2 psi. However, the same response is not necessarily available on the CCVs of older freight cars, which are still very common throughout North America. Various field and laboratory tests were conducted by CCV manufacturers and the AAR between 2002 and 2004 to evaluate the response of some CCVs to small stepped brake pipe reductions.83 The tests indicated that 1 psi stepped brake pipe reductions following a minimum brake reduction resulted in almost no additional BCP build-up on some freight cars. The tests also incorporated a few minutes of wait time between each stepped reduction, to give enough time for the CCVs to respond to the brake pipe reductions. Most cars did not respond to the incremental 1 psi brake pipe pressure reductions, and the dwell time between reductions also resulted in the auxiliary reservoir pressure being depleted into the brake pipe through the weeper port. As a result, no additional BCP developed during the stepped reductions and through the incremental depletion of the auxiliary reservoir pressure. These tests showed that a train operating with a series of such CCVs would not achieve expected brake performance and an increase in retardation in response to small incremental stepped brake pipe pressure reductions. The CCV design most susceptible to this condition was the one that included a DB-10 service portion manufactured by NYAB before 2005. In 2005, the AAR Specification S-464 was changed to address this issue on new and reconditioned service portions.84 Therefore, the condition would only be present on DB-10 service portions that had not been reconditioned since then. In the occurrence train, 47 grain cars were equipped with NYAB’s DB-10 service portions, 27 of which (24% of the train consist) had old units that were never reconditioned. 1.21.4 Examination of the train’s car control valves Overall, 86.6% of the portions were recovered from the wreckage and were examined. Due to the extensive damage sustained by the derailed cars and their rolled-over positions at the
83 R. Gayfer, “Performance Characteristics of AAR Pneumatic Brake Systems to Small Brake Pipe Reductions,” presented at the Air Brake Associations Conference (2002). 84 Association of American Railroads, Manual of Standards and Recommended Practices, Section E: Brakes and Brake Equipment, Specification S-464: Test Rack, 150-Car, Performance Testing Procedure of freight control valves, (updated in 2005).
TRANSPORTATION SAFETY BOARD OF CANADA 94 derailment site, only 25% (49 of 194) of the examined portions were matched to the car on which they were installed at the time of the occurrence. 1.21.4.1 Make and model of car control valve portions The recovered portions originated from 2 main manufacturers—Wabtec and NYAB (Table 17). There were 3 Wabtec models: ABDX, ABDW and ABD. The ABDX service portion is the newest valve model and was introduced in 1989,85 while the ABDW emergency portion was introduced in 1976.86 The 3rd model of Wabtec valves was the ABD model, introduced in 1962.87 The NYAB portions were the DB-10 service portion and the DB-20 emergency portion that were approved by the AAR in the early 1990s. Table 17. Examined brake valve portions by make and model Make Model Number of examined portions Percentage of all examined portions Wabtec ABDX 42 21.7 ABDW 13 6.7 ABD 51 26.3 Total Wabtec 106 54.6 NYAB DB-10 47 24.2 DB-20 41 21.1 Total NYAB 88 45.4 1.21.4.2 Date of manufacture None of the CCV portions had any direct stencil providing information about their age or date of manufacture. Just over 60% (119 of 194) of the recovered valve portions had legible serial numbers. Less than 25% of the recovered Wabtec portions had OEM identification tags (OEM ID tags). AAR data show that only 30% of the valves in the railway industry are currently bar-coded and entered in the AAR database. The AAR issued new requirements in 2016 to have bar codes on each valve portion to indicate the date of manufacture and of last reconditioning. According to the age ranges provided by the manufacturers, 78 portions on the occurrence train with known dates of manufacture were older than 15 years (Figure 35). Wabtec introduced OEM ID tags and serial numbers only after 1996, which suggests that the Wabtec portions with no OEM ID tags were likely manufactured prior to that date. When the Wabtec portions with no OEM ID tags are added to the 78 portions mentioned above, the total number of portions older than 15 years is 142 (63% of the total).
85 W. Middleton, R. Morgan and R. Diehl, Encyclopedia of North American Railroads (Indiana University Press, 2007), p. 1099. 86 Ibid. 87 Ibid.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 95 Figure 35. Distribution of the control valve portions by age and manufacturer (Source: TSB)
- 21.4.3
Date of last reconditioning About 46% of recovered portions (89 units) had no information concerning their last reconditioning COT&S dates. Out of the valves manufactured by Wabtec, 40 portions (38%) had not been reconditioned over the last 15 years. The train consist included 47 grain cars equipped with NYAB DB-10 service portions, of which 36 were manufactured before 2005, including 27 (24% of the train consist) that were never reconditioned. Maintenance requirements for CCVs at the time of the occurrence were condition-based, where the cars were required to undergo an SCT test at least every 60 months88 using an automated or a manual SCT device. Cars that failed this SCT required CCVs to be replaced based on the type and nature of the failures. Previously, CCVs were required to be reconditioned or replaced on a time-based regime. In the 1930s, this interval was every 3 years. It gradually increased to 16 years between the 1960s and the late 1980s. It was eventually eliminated in the 1990s89 and replaced by the AAR condition-based replacement policy.90
88 Association of American Railroads, Field Manual of the AAR Interchange Rules, Rule 3: Testing of Air Brakes. 89 K. Carriere, “Initiatives in Braking Maintenance Methodology,” presented at the Canadian Air Brake Club – Western Chapter (03 February 2020). 90 Association of American Railroads, Circular Letter c-7777 (20 December 1991).
TRANSPORTATION SAFETY BOARD OF CANADA 96 1.21.5 Actions taken by the Association of American Railroads Following a 10 January 2018 occurrence at Luscar Industrial Spur in Leyland, Alberta, in which a freight train rolled uncontrolled while proceeding down a mountain grade,91 and in response to a number of other occurrences in Canada and the U.S., the AAR looked into the issue of leakage from older CCVs in extreme cold temperatures. The AAR determined that old rubber parts inside CCVs cannot be depended upon to prevent leakage in extreme cold temperatures. As a result, the AAR has defined conditions under which CCVs should be replaced due to their age and exposure to service conditions in cold temperatures. Circular Letter C-13556 was issued to that effect on 30 April 2020, seeking industry comments, with a target implementation date of 01 July 2020. This new requirement applies to freight cars with CCVs older than 13 years since their last COT&S date, which will be working north of the 37th parallel during winter months. The AAR has also designated a new and unique repair code (WMC 1K) to identify the replacement of such over-age CCVs. The entire text of the July 2021 revision is listed as follows: […]
- When Car is on Shop or Repair Track for Any Reason
a. Vacant
- As Noted Below:
a. Service and/or emergency portion control valves with a manufacture or recondition date (whichever is later) of 13 years may be renewed, and if over 14 years must be renewed for over age cause on a car if:
(1) The car will be part of a unit train service carrying coal, grain, High Hazardous Flammable Class 3 Commodity, or Toxic Inhalation Hazard (TIH/PIH) service; and
(2) Operates any part of its route in territory above the 37th parallel for any length of time within the date range of November 1st thru April 1st
(a) Car does not need to be operating north of the 37th parallel at the time of renewal
(b) Renewal may occur at any point throughout the year92 The issue of renewing older NYAB’s DB-60 CCVs was introduced as a bill by the U.S. House Committee on Transportation and Infrastructure (T&I) in 2020, and was folded into the Moving Forward Act. The bill called for trains operating north of the 37th parallel to renew any DB-60 CCV manufactured before 01 January 2006. The requirement would have come into effect on unit trains starting on 01 August 2022, and on all other merchandise trains starting on 01 August 2024. The bill called for the U.S. Government to track the progress of
91 TSB Rail Transportation Safety Investigation Report R18E0007. 92 Association of American Railroads, Field Manual of the AAR Interchange Rules (July 2021), Rule 4.A.2-3.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 97 phasing out these brake valves and the number of trains still operating with them.93 After the January 2021 change in U.S. Administration, this bill was no longer in motion, but it had gained high importance for the AAR to implement changes to the Field Manual Rule 4, to require time-based renewals of old CCVs in unit train operation. 1.22 Comparison between the recovered cars and the derailed cars Some of the fundamental statistics (age, CCVs, maintenance history, WTD data) between the 13 recovered cars and the 99 derailed cars94 were compared to determine to what extent the test results of the 13 recovered cars could represent the braking performance of train 301-349 as it operated through Partridge at the time of the occurrence. As Figure 36 shows, the recovered cars were similar in age to the derailed cars. This was confirmed by an independent-samples Student’s t-test, which showed that there was no significant difference in the ages of recovered cars (M=26.1 years, SD=12.8 years) and derailed cars (M=27.9 years, SD=10.1); t (107)=0.602, p = 0.549.95
93 J. Marsh, “Putting the brakes on brakes,” FreightWaves, (05 July 2020) at https://www.freightwaves.com/news/putting-the-brakes-on-brakes (last accessed on 02 August 2021). 94 Although 2 cars on the occurrence train had their air brakes cut out, these cars had operative air brakes during their previous loaded trip west to Vancouver. The 2 cars were included for analytical purposes and comparison with the 13 recovered cars, given that they provided additional data points in terms of fundamental statistics (age, maintenance history, CCV, WTD data). 95 A Student’s t-test is a statistical test of the equality of the means (M) of 2 groups. The t-statistic is a measure of the difference between 2 group means. The further the t-statistic is from zero, the lower the probability that it could occur by chance. By scientific convention, if the probability (p) of a result is less than .05 (i.e., it falls in the most extreme 5% of the t-distribution), it is accepted as a meaningful result (i.e., it is statistically significant).
TRANSPORTATION SAFETY BOARD OF CANADA 98 Figure 36. Age of derailed and recovered cars from the occurrence train (Source: TSB, using data from the Universal Machine Language Equipment Register (UMLER) database, maintained by the Association of American Railroads) 1.22.1 Car control valves Of the 13 recovered cars, 4 were equipped with NYAB DB-10 service portions. One of those 4 cars had the DB-10 service portion replaced in 2010. The other 3 cars (23% of the total recovered cars) were susceptible to leakage; 1 had a 12-year-old valve and the other 2 had DB-10 service portions that had not been reconditioned in the last 13 years.96 Similarly, 47 grain cars in the train were equipped with NYAB DB-10 service portions, of which 27 (24%) had old units that were never reconditioned. Of the 13 recovered cars, 5 (38%) were equipped with the oldest version Wabtec ABD service portions. Similarly, 51 cars out of 112 cars (45%) in the train were equipped with ABD service portions. 1.22.2 Wheel temperature data Data from the Mile 111.7 WTD for the 13 recovered cars and the 99 derailed cars destroyed in the derailment were compared. Their summary statistics are presented in Table 18, and a histogram of the wheel distribution by temperature range for both groups of cars is shown in figures 37 and 38.
96 These 2 cars had a proper brake application response during the outdoor tests; however, the outside temperature was not as cold as the day of the occurrence.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 99 Independent-samples Student’s t-tests were conducted to compare individual wheel temperatures of the 13 recovered cars and the 99 derailed cars at 2 locations (Mile 95.1 and Mile 111.7). Mile 95.1 wheel temperatures were not significantly different for recovered cars (M=160.7, SD=67.7) compared to derailed cars (M=148.2, SD=73.7); t (894)=1.634, p = 0.103, nor were Mile 111.7 wheel temperatures significantly different for recovered cars (M=160.1, SD=62.7) compared to derailed cars (M=159.1, SD=71.4); t (894)=1.634, p = 0.103. These results demonstrate that individual wheel temperatures of recovered cars were not significantly different from those of the derailed cars. Table 18. Summary wheel temperature statistics for the 13 recovered cars and the 99 derailed cars Rail cars Average wheel temperature (°F) Standard deviation (°F) Total wheels Cold wheels 13 recovered cars 160.1 57.9 104 13 (13%) 99 derailed cars 159.1 63.6 792 99 (13%)
Figure 37. Wheel distribution by temperature range for the 13 recovered cars (Source: TSB)
TRANSPORTATION SAFETY BOARD OF CANADA 100 Figure 38. Wheel distribution by temperature range for the 99 derailed cars (Source: TSB)
Taken together, these tests and observations of the fundamental car characteristics (age, maintenance history, CCVs, WTD data) demonstrate that the 13 recovered cars are representative of the cars on the entire train. Due to the strong interdependence between air pressure losses and temperature, the brake cylinder leakage rate when the WTD data were obtained (with an ambient temperature between −0.5 °C and −3.9 °C) is lower than the rate that would have existed on the occurrence train when the ambient temperature was between −20 °C and −28 °C. Therefore, the brake performance of the train while it was operating through Partridge would have been more degraded than suggested by the WTD results. The Banff test results from the 13 cars were obtained in temperatures similar to that of the accident. In addition, the ASCT results on the 13 cars provide an accurate representation since they were conducted outdoors, during the night, and in extreme cold temperatures (ambient temperature in the same range as the night of the occurrence). All of the cars failed the SCT for various causes related to cold temperature leakages and malfunctions. As equipment and temperature were not different from occurrence conditions, the test results were statistically extrapolated to determine the most likely braking performance (with confidence intervals) of the occurrence train. Results of the service brake application tests conducted in Banff on the 13 recovered cars revealed that the probability of a car having deficient braking due to inadequate BCP was p = 0.46 [95% confidence interval of 0.19 to 0.73]. According to that confidence
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 101 interval, it was 95% probable that between 19 and 73 cars of the 99 derailed cars had deficient braking. Adding the 6 recovered cars with deficient braking to that range yields a 95% probability that between 25 cars and 79 cars of the 112-car train had deficient braking due to inadequate BCP after 19 minutes of the Banff test conditions, with 52 cars being the most likely number of cars with deficient braking. This number of cars with deficient braking explains why the train’s speed could not be maintained at or below the maximum allowable authorized speed of 15 mph when descending Field Hill. 1.23 Developments in freight train brake technology Many technological advancements have been developed and are available to North American railways to enhance train brake performance. The Class I railways have been receptive to assessing these advancements, but have not fully implemented them. At the time of the occurrence, there were no regulatory requirements for their implementation. Key emerging technologies are listed below. 1.23.1 Automatic parking brakes Automatic parking brakes are an alternative to hand brakes; one of their greatest advantages is that they require no human intervention. Two major brands of automatic parking brakes are available on the market today: NYAB’s ParkLoc brake cylinder and Wabtec’s APB (automatic park brake). Automatic parking brakes are brake cylinders equipped with an automatic, mechanically operated latch that locks and retracts the brake cylinder piston as needed depending on the pressure in the brake pipe. When the brake pipe pressure is depleted (e.g., after a penalty or an emergency brake application), the system automatically locks the brake cylinder piston in the extended position, thereby retaining the brake force. The brake pipe pressure thresholds that trigger this feature vary between models, but usually automatic parking brakes engage when the pressure is in the 10 to 20 psi range. Once the brake pipe pressure increases again (in the range of 40 to 45 psi depending on the model), the system automatically releases the lock and retracts the brake cylinder piston, which releases the brake force. It is also possible to manually disengage the lock, regardless of the pressure in the brake pipe, to drain the car’s air pressure for maintenance or repairs. Figure 39 illustrates the basic functionality of Wabtec’s APB design. The image on the left shows the APB in a released state, with the latching mechanism disengaged. The image on the right shows the APB in the locked, mechanically held state.
TRANSPORTATION SAFETY BOARD OF CANADA 102 Figure 39. Diagram of TMX cylinder showing the APB automatic parking brake released (left) and engaged (right) (Source: Wabtec, with TSB annotations)
Automatic parking brakes can be configured for use on both truck-mounted and body- mounted brake systems, and they can be retrofitted on existing freight cars with no need to make modifications to the air brake system. Figure 40 shows NYAB’s ParkLoc brake cylinder configured for use on a truck-mounted brake system on Wabash National freight cars. Figure 41 shows the ParkLoc brake cylinder configured for use on a standard body-mounted brake system as a retrofit solution. Figure 40. ParkLoc brake cylinder configured for use on a truck-mounted brake system for Wabash National freight cars (Source: New York Air Brake)
Figure 41. ParkLoc brake cylinder configured as a retrofit for a body-mounted brake system (Source: New York Air Brake)
Wabtec’s APB is an integrated add-on to the non-pressure head of truck-mounted and body- mounted brake cylinders (Figure 42). The latching function is operated by a secondary mechanism that requires only 2¼ cubic inches of air to activate. The APB can also be integrated with a body-mounted brake cylinder (Figure 43).
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 103 Figure 42. Wabtec APB (Source: Wabtec)
Figure 43. Wabtec APB integrated with a body- mounted brake cylinder (Source: Wabtec)
Wabtec also manufactures a pneumatic control module for the APB (Figure 44). The pneumatic control is a manifold connected to the APB, brake pipe, and auxiliary reservoir on each car for manual control of the automatic air brake. Figure 44. Control module for Wabtec’s APB automatic parking brake (Source: Wabtec)
In this design, a ball valve can be manually closed on each car to isolate the APB from the brake pipe, thereby maintaining the parking brake in the applied state while the brake pipe is recharging. It has a similar function as retainers on traditional hand brakes, with some notable exceptions: • The pneumatic control module retains the full brake force, contrary to traditional retainers which retain only 20 psi of brake pipe pressure when set to the HP position. • These modules also do not release the brake force even when the BCP becomes depleted due to leaks.
TRANSPORTATION SAFETY BOARD OF CANADA 104 1.23.2 Brake cylinder maintaining feature The QSLV on all AAR-approved CCVs is equipped with a pressure maintaining feature. This feature ensures that the pressure in the brake cylinder remains between 8 and 12 psi, even when brake cylinder leakage exists. The QSLV replenishes any air that leaks from the brake cylinder by diverting brake pipe air into the brake cylinder. This feature, however, is effective only as long as air pressure exists in the brake pipe; it is not available during an emergency brake application, because applying the brakes in emergency depletes the brake pipe pressure completely. Since 2014, CCVs have included a brake cylinder maintaining (BCM) feature in addition to the QSLV pressure maintaining feature. BCM is available not only for minimum brake applications, but also up to a full-service brake application.97 The extended operating range of BCM offsets air leakage from the brake cylinder by diverting brake pipe air into the brake cylinder to maintain it at the targeted BCP levels in response to automatic brake applications. According to AAR Standard S-486, the maximum acceptable limit of brake cylinder leakage during an SCT is 1 psi/minute.98 Figure 45 illustrates BCM activation at this leakage rate for an automatic brake application of 15 psi brake pipe reduction. It shows that, without BCM, the initial BCP of 37 psi will leak down to the 8 to 12 psi maintained by the QSLV after 20 minutes (1200 seconds) of a sustained brake application on a long descending grade. The BCM feature will restore the pressure leaked off from the brake cylinder to its target level of 37 psi by using brake pipe air to offset the leakage.
97 A. Aronian and L. Vaughn, “NYAB Brake Cylinder Maintaining Trials Update”, presented at the Air Brake Association Conference, Minneapolis, Minnesota (October 2015). 98 Association of American Railroads, Manual of Standards and Recommended Practices, Standard S-486: Brakes and Brake Equipment Code of Air Brake System Tests for Freight Equipment – Single Car Test (revised 2018).
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 105 Figure 45. Activation of brake cylinder maintaining feature for a 1 psi/minute leakage rate of brake cylinder pressure (Source: A. Aronian & L. Vaughn, “NYAB Brake Cylinder Maintaining and Field Trials Update”, presented at the Air Brake Association Conference, Minneapolis, Minnesota [October 2015])
By maintaining the target BCP to compensate brake cylinder air pressure loss due to leakage, BCM improves the overall brake efficiency of the train’s automatic brakes in extreme cold temperature. Improved brake efficiency, in turn, will improve train handling and maintain a uniform brake application to balance the train’s speed on descending grades, even when cars have brake cylinder leakage. Field testing has proved that brake cylinder leakage of up to 2 psi/minute (double the maximum acceptable limit stated in AAR Standard S-486) can be mitigated by the BCM feature. 1.23.3 Dynamic brake retention on distributed power remote locomotives DB holding is a feature that allows the DB on a locomotive to continue working in the event of an emergency brake application. On territories where locomotives with DB are required, these locomotives must have the DB holding feature. TC’s Railway Locomotive Inspection and Safety Rules, Part III: Locomotive Inspection Requirements sets forth the requirements for locomotive DB functionality. Section 21 (Brake System) states, in part, 21.2 A railway company shall file with the Department all territories on which locomotives with dynamic brake are required, as well as related instructions. This information shall be filed with the Department no later than ninety days from the approval of these rules. […] 21.4 All existing freight locomotives intended to operate in territory as set out in subsection 21.2 shall be modified prior to December 31, 2010 to incorporate a dynamic brake holding feature if not already equipped. 21.5(a) Dynamic brake is considered a supplemental braking system however company instructions and procedures shall ensure that the friction brakes
TRANSPORTATION SAFETY BOARD OF CANADA 106 are sufficient by themselves, without the aid of dynamic brakes, to stop the train safely under all operating conditions.99 In addition, the AAR Specification S-5018 “Dynamic Brake Control” contains the following requirements with respect to DB brake holding in the context of emergency brake applications: 3.4 Locomotives with dynamic braking must be equipped with a dynamic brake- holding feature that operates in the following manner: 3.4.1 Maintains dynamic braking during a penalty or an emergency air brake application.100 The above requirements are considered to have been met when locomotives in the head- end locomotive consist, not subject to restrictions on the number of braking axles, have DB holding. There is no requirement for DB holding on mid-train or tail-end remote locomotives. On older DP systems, DB holding is not available on remotely controlled locomotives that are connected to the lead locomotive via radio communication DP protocol. However, GE- Wabtec, the manufacturer of DP systems, has developed a DB retention feature, similar to the DB holding feature on lead locomotives, that retains full DB capability when the remote locomotives go into emergency. This feature provides added safety for high-tonnage trains following emergency brake applications made when descending heavy and mountain grade territories. The DB retention feature was not available on the 2 DP remote locomotives on the occurrence train, UP 5359 and CEFX 1040. Consequently, after the train was stopped in emergency at Partridge, the DB system on these locomotives was disabled. In lieu of DB holding, the DP system applied up to 45 psi of independent BCP when the emergency brakes were applied on the remote locomotives. This is a design characteristic of DP systems, intended to avoid thermal mechanical damage to the locomotive wheels when bringing the locomotives to a stop in emergency. Full independent BCP (72 psi) is used only when the locomotive is stationary. 1.23.4 Electronically controlled pneumatic brake system Since the inception of the air brake system in the 1870s, the brake technology on freight trains has improved in performance and design, but the basic principle has remained the same: the application and release of the train’s air brakes is achieved through reductions and increases in the brake pipe pressure. In the early 1990s, the AAR began looking into newer, more advanced brake technology, including the electronically controlled pneumatic (ECP) brake system.
99 Transport Canada, Railway Locomotive Inspection and Safety Rules (03 July 2015), Part III: Locomotive Inspection Requirements, section 21: Brake System. 100 Association of American Railroads, Specification S-5018: Dynamic Brake Control (adopted 1971, last revised April 2020), section 3.4.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 107 On a train equipped with ECP, a brake controller is installed on the locomotive, and a car control device (CCD) is installed on each car. The brake controller interprets the brake application and release commands that it receives from the locomotive’s automatic brake handle and then sends an electronic wireline signal to the CCD on each car through an intra- car cable that runs the length of the train. On the cars, the CCD interprets the signals and activates the CCV, thereby allowing air from the reservoir to travel into the brake cylinders, which provides the braking force. On an ECP system, the brake pipe’s sole purpose is to supply air to the reservoirs on the cars; it remains in a continuously charging state. This is different from the role of the brake pipe in standard pneumatic brake systems, in which reductions in brake pipe pressure are used to apply the brakes by activating each car’s CCV.101 ECP systems offer several advantages over standard pneumatic brake technology, including the following: • Near-instantaneous transmission of brake application and release commands through the use of wireline electronic signals. • Remote monitoring of the brakes on each car from the locomotive cab. At any given time, the locomotive operator can view the status of each individual car and its braking performance on the operator display screen. • Automatic car cut-out: the system automatically senses cars that are not responding as expected to the braking commands and cuts them out. • Automatic penalty brake application: when the ECP system detects that 15% or more of the cars on the train have ineffective brakes, it automatically makes a penalty brake application, which brings the train to a full stop. When this occurs, the brakes can be recovered only by setting off the bad order cars.102 • Graduated brake release. This feature allows the LE to reduce brake retardation effort without fully releasing the brakes and re-applying them (release and catch); this facilitates the task of properly balancing train speed during a continuous service brake application or when recovering from an emergency brake application. • Constant replenishing of the brake pipe and car reservoirs. • Continuous brake cylinder pressure control, which is the same as the BCM feature on cars not equipped with ECP. ECP systems were nearly made mandatory by the U.S. Federal Railroad Administration in
- These systems would have been required on all unit trains carrying dangerous goods.
However, this initiative was dropped in 2018 due to high initial implementation costs and logistics issues regarding the interoperability of trains that have ECP systems with trains that have pneumatic conventional brakes.
101 A. Aronian, K. Wachs, S. Bell et al., “Electronically-Controlled Pneumatic (ECP) Brake Experience at Canadian Pacific”, presented at the 2011 International Heavy Haul Association Conference, Calgary, Alberta (19 June to 22 June 2011). 102 Ibid.
TRANSPORTATION SAFETY BOARD OF CANADA 108 However, runaway trains are still occurring, sometimes with fatal consequences. In addition to this occurrence, 5 other significant runaway train events have occurred in North America between 2017 and 2019 that would have been preventable with ECP. In Canada: • On 10 January 2018, Canadian National Railway Company freight train L76951-10, proceeding southward on the Luscar Industrial Spur, leaked compressed air from the air brake system in extreme cold temperature conditions and started to roll uncontrolled while descending the mountain grade to Leyland, Alberta. The train reached a maximum speed of 53 mph before it came to a stop at Mile 0.5.103 In the U.S.: • In 2019, BNSF Railway trains in North Dakota ran away on 2 separate occasions (Dengate and Hettinger). In those occurrences, the cars were not able to propagate an emergency brake application after a pull-apart, which resulted in an uncontrolled movement. • On 04 October 2018, a Union Pacific train with a pinched air hose ran away in Granite Canyon, Wyoming; it descended a steep grade uncontrolled at 50 mph before colliding into the back of a stationary train, resulting in 2 fatalities. • On 02 August 2017, a 178-car CSX train ran away uncontrolled near Hyndman, Pennsylvania due to an undesired release of the brakes. After the train was brought to a stop and the emergency brake application was recovered, the train proceeded but subsequently derailed and released dangerous goods which caught fire. 1.23.5 High-capacity fade-resistant brake shoes When the automatic brake is applied, heat is generated at the brake shoe/wheel tread interface. The amount of heat generated is proportional to BHP. Heavier cars need a higher retarding force for speed control when descending grades and therefore generate higher temperatures and are exposed to higher BHP. When the thermal capacity of brake shoes is exceeded for a sufficient length of time, or when the speed of the train is increasing at a high rate, friction fade can occur and reduce the coefficient of friction. For a train to descend a long mountain grade at constant speed, any reduction in brake retarding force at those wheels where brake shoe friction fade is occurring must be compensated for by increasing the braking effort. The application of more brake shoe force can cause the wheels to be subject to even more friction fade due to the additional braking effort imposed upon them. This cycle of friction fade and higher brake force inputs will result in a spiralling condition of overall degradation of the retarding force available to control the train speed. AAR Specification M-926, first issued in 1964, is the standard used to manufacture high- friction composition brake shoes for rail cars. The grade test specified in M-926 requires brake shoes to be exposed to a 1450-pound net shoe force (equivalent to a BCP of 22 psi) at 20 mph for 45 minutes and produce a minimum retarding force of 400 pounds. Although a
103 TSB Rail Transportation Safety Investigation Report R18E0007.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 109 BHP value is not specified in this specification, the retarding force is equivalent to a coefficient of friction of no less than 0.28 and BHP of 21 at a temperature of 600 °F (316 °C). Following 2 catastrophic runaway derailments in the United States in 1997 and 2000, a Brake Shoe Fade Task Force104 was established to develop an appropriate grade test to address the higher shoe forces present on today’s heavier cars. The task force proposed a heavy grade test where the net shoe force input was increased well beyond the level indicated in AAR Specification M-926. Fade-resistant brake shoes with improved performance were designed to the proposed specification. This led in 2008 to a new AAR Specification, M-997 (Brake Shoe - High Friction Tread Conditioning, High Capacity). It specifies a new heavy grade test requirement, which requires that rail car brake shoes retain a minimum of 600-pound retarding force when exposed to a 2250-pound brake shoe force (equivalent to 34 psi BCP) for 45 minutes at a speed of 20 mph. The retarding force is also equivalent to a minimum coefficient of friction of 0.27, but for a much higher brake force input. Since 2008, 2 brake shoe manufacturers in North America have offered this type of high- capacity, fade-resistant brake shoe: Railway Friction Products (a subsidiary of Wabtec) and Anchor Brake Shoe Company LLC (a subsidiary of NYAB). These brake shoes are known today as Cobra TreadGuard (RFP-Wabtec) and WheelSaver (Anchor-NYAB). The AAR has not mandated the use of high-capacity fade-resistant brake shoes on all 110- ton heavy axle load freight cars, but requires that they be replaced in kind when a freight car is so equipped.105 North American railways have slowly106 adopted these high-capacity brake shoes, partly because they cost more than the M-926 standard brake shoe. Other considerations include commodities being transported, territory of operation, and equipment utilization. Nevertheless, car owners and railways that operate in mountain grade territory can benefit from these fade-resistant brake shoes for their unit train operations because they add another level of safety. The TSB has previously discussed the use and benefits of fade-resistant brake shoes in its investigation report following an occurrence on 29 June 2006 in which a CN freight train locomotive and a loaded car of lumber derailed after losing control while descending the grade near Lillooet, BC.107 In that investigation, it was noted that an AAR Standard for fade-
104 Composed of representatives of several North American railroads, the Transportation Technology Center, Inc., the AAR, and wheel and brake shoe manufacturers. 105 Association of American Railroads, Field Manual of Interchange Rules (2019), Rule 12, Section B: Correct Repair Chart for Brake Shoes. 106 A review of car repair billing records by the AAR for the years 2016 to 2020 indicates that the usage of Tread Guard and Wheel Saver brake shoes was as follows, expressed as a combined percentage of total brakes shoes applied: 2016: 22.3% 2017: 27.2% 2018: 27.7% 2019: 28.3% 2020: 30% 107 TSB Railway Investigation Report R06V0136.
TRANSPORTATION SAFETY BOARD OF CANADA 110 resistant brake shoes had been established and fade-resistant brake shoes had been developed, but their use had not been made mandatory. Therefore, the Board was concerned that heavier cars would continue to be operated with the older specification brake shoe. The AAR has not yet adopted a framework providing for the mandatory use of high-capacity brake shoes for equipment in interchange service. 1.24 Training 1.24.1 Requirements and regulations 1.24.1.1 Railway Employee Qualification Standards Regulations In Canada, federally regulated railways must abide by the Railway Employee Qualification Standards Regulations (the EQS Regulations). These regulations, which came into force in 1987, establish the minimum qualifications for LEs, transfer hostlers, conductors, and yard foremen. They apply to all railway employees performing the duties of the specified occupational category. The training and qualification issue was examined by the 2017 Railway Safety Act (RSA) review panel. Its report, entitled Enhancing Rail Safety in Canada: Working Together for Safer Communities, included the following observations: Although Transport Canada certifies aviation and marine crew members, there are no provisions for certifying railway employees or approving railway training programs. As such, each company is awarded considerable latitude in preparing and providing training and certification tailored to the specific needs of its employees. The Review heard from some Transport Canada inspectors that they occasionally note gaps in the consistency of training (e.g., knowledge) of railway personnel, and while CN and CP have taken steps to address training gaps through company training centres in Winnipeg and Calgary, further efforts could be made to strengthen training requirements of railway personnel. […]108 The EQS Regulations require railways to file with TC a description of all employee training programs and subsequent changes related to each occupational category. Railways are also required to submit an updated report to TC on their employee training programs each year. The training curriculum required for conductors and LEs includes the following: • Regulations No. 0-8, Uniform Code of Operating Rules • railway radio regulations • dangerous commodities • train marshalling • air brake systems and tests • freight car and train inspections • passenger evacuation procedures
108 Transport Canada, Enhancing Rail Safety in Canada: Working Together for Safer Communities: The 2017 Railway Safety Act Review (2018), section 2.2: Training Within the Industry, p. 33.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 111 For LEs, additional required training includes locomotive operation, air brake and train handling. Although the EQS Regulations require railway companies to file with TC information on their employee qualification program and any changes made to the program, the filings can be in the form of a summary and do not necessarily include all course content. While TC may occasionally conduct a cursory review of company submissions, the regulations do not require TC to review the course content in detail or to approve it. 1.24.1.2 Railway Safety Management System Regulations, 2015 and Railway Rules Governing Safety Critical Positions Regulatory requirements for the training and certification of railway operating employees are specified in the Railway Safety Management System Regulations, 2015 (the SMS Regulations). Sections 25 to 27 of the SMS Regulations require a railway company to have a process for managing knowledge: A railway company must establish a list setting out (a) the duties that are essential to safe railway operations; (b) the positions in the railway company that have responsibility for the performance of each of those duties; and (c) the skills and qualifications required to perform each of those duties safely.109 The SMS Regulations also require that railway companies include the following in their SMS: • a plan for ensuring that an employee who performs any of the duties referred to in the list has the skills, knowledge and qualifications required to perform their duties safely • a method for verifying that an employee who performs any of the duties referred to in the list has the skills, knowledge and qualifications required to perform their duties safely • a method for verifying that a supervisor who performs any of the duties referred to in the list has the skills, knowledge and qualifications required to perform their duties safely The TC-approved Railway Rules Governing Safety Critical Positions were developed pursuant to section 20 of the RSA. Section 3 of those rules states the following: A “Safety Critical Position” is herein defined as:
- any railway position directly engaged in operation of trains in main track or
yard service; and
- any railway position engaged in rail traffic control.
109 Transport Canada, SOR/2015-26, Railway Safety Management System Regulations, 2015, subsection 5(1).
TRANSPORTATION SAFETY BOARD OF CANADA 112 Any person performing any of the duties normally performed by a person holding a Safety Critical Position, as set out in section 3 above, is deemed to be holding a Safety Critical Position while performing those duties.110 1.24.2 Canadian Pacific training program 1.24.2.1 Training for conductors CP’s training program for new conductors consists of classroom training and on-the-job training; the classroom portion includes: • 2 weeks of initial classroom training (general orientation and basic safety instructions); • a critical task sign-off prior to field training (assessment conducted in the field to confirm that the trainee is physically able to perform critical tasks); • 4 weeks of on-the-job training, including yard and road trips with a coach; • 2 weeks of additional classroom training, where trainees receive comprehensive rules and instructions training on various subjects, including safe work procedures, CROR, company GOIs, and special instructions; and • 2 weeks in a simulated environment where trainees practice applying rules and GOIs as well as crew resource management (CRM) principles. Following the classroom training, conductor trainees begin the practical portion of the training program. During on-the-job training, qualified conductors coach and mentor the trainees on the rules and instructions pertaining to the work, and on the specifics of the yard or territory. The trainees then put into practice what they learn in the classroom. On average, trainees complete on-the-job training to proficiency over a 5-month period and become qualified once a company manager, who observes them in the field, deems them ready. 1.24.2.2 Training for locomotive engineers Qualified unionized conductors can apply after a 2-year period to become an LE by taking the following additional training: • 4 weeks of classroom training, including one week of a detailed review of CROR, safety, and general rules. • On-the-job training, during which the trainees complete a number of training trips on various subdivisions with a supervising LE until they are proficient at train handling. These trips also help to familiarize the trainees with the subdivisions within their territory. • 2 weeks of mechanical classroom training, including troubleshooting, air brake systems, train handling instructions, fuel conservation, track/train dynamics, and DP.
110 Transport Canada, TC 0-17, Railway Rules Governing Safety Critical Positions (16 June 2000).
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 113 After 3 months of combined classroom and on-the-job training, employees are recalled for a final examination. They then resume on-the-job training until they qualify. 1.24.2.3 Supervisor qualification and training Trainmasters, as first-line supervisors, assume the general supervision of LEs and conductors and oversee the day-to-day train operations on their assigned territory. Trainmasters usually come from a qualified railway position (often related to train operations), but it is increasingly common for candidates to be hired from outside the railway industry. They receive extensive training in railway operations, including conductor and LE certifications. Many railway companies in North America, including CP, also employ road foremen. This is also a supervisory role, but with a focus on the technical aspects of train operations (train handling, air brake operation, train dynamics). Road foremen are experienced LEs with high technical and operational expertise. They are responsible for training, coaching, and evaluating the performance of LEs and conductors. They intervene in complex operational situations, such as emergency brake recovery on a mountain grade, to share their experience and knowledge and provide solutions. The position of road foreman for the Calgary terminal was vacant from 2016 to 2018. The road foreman duties were transferred to the trainmasters; however, no special training was provided to bridge the technical gap and the difference in experience that existed between the 2 positions. At the time of the occurrence, there was 1 person holding the title of road foreman at the Calgary terminal, but the incumbent ’s technical expertise and experience were similar to those of a trainmaster. 1.24.2.4 Field Hill training and certification After 2 occurrences on Field Hill—one in 1997 which resulted in an uncontrolled high- speed descent and the derailment of 66 cars111 and one in January 1998 in which a freight train handling 112 cars ran uncontrolled between the Upper Spiral Tunnel and Field112—CP made modifications to the FHOP. CP later initiated changes to its training program for both conductors and LEs working on the Laggan Subdivision. 1.24.2.4.1 Field Hill certification for conductors Operating in mountain grade territory can significantly alter the complexity of a conductor’s duties, introducing additional cognitive demands.113
111 TSB Railway Investigation Report R97C0147. 112 TSB Railway Investigation Report R98C0001. 113 H. Rosenhand, E. Roth, and J. Multer, DOT/FRA/ORD-12/13, Cognitive and Collaborative Demands of Freight Conductors Activities: Results and Implications of a Cognitive Task Analysis (United States Department of Transportation, July 2012)
TRANSPORTATION SAFETY BOARD OF CANADA 114 After the accident in 1997, CP developed a training program for conductors operating on Field Hill entitled Canadian Pacific Railway Calgary Terminal Field Hill Simulator Training. The program put an emphasis on mountain and heavy grade operations and included the following activities: • the review of the FHOP, including requirements of CROR, GOI, and application of retainers and hand brakes; • the review of emergency, recovery, and undesired release scenarios; • 5 trips down Field Hill with a qualified conductor; • participation in 5 simulation trips accompanied by a field placement coordinator, with evaluations signed by both the trainee and the coordinator after each trip; • a test to ensure conductors understood required procedures; and • a final trip down Field Hill with a placement coordinator who assesses whether qualification was met. The duration of the training was approximately 2 months longer than the standard conductor training, and conductors who completed it successfully received a Field Hill certification. The training program was significantly modified in 2017–2018; it was accelerated, as there was a greater demand for conductors due to increased traffic levels. The new requirements for a conductor to work on Field Hill, up to the time of the occurrence, were reduced to classroom review of the FHOP using job aids and track schematics. The simulation trips on Field Hill were removed. Conductors were no longer required to be Field Hill–certified. 1.24.2.4.2 Field Hill certification for locomotive engineers LEs must be certified for the subdivision on which they operate. On the Laggan Subdivision, the certification for LEs requires approximately 3 extra months of training specifically dedicated to Field Hill operations. The training also includes 3 to 4 days with a trainmaster to practise and qualify in the following skills: • ascending and descending the mountain grade of Field Hill • performing “stop and go” scenarios at Partridge and full service “release and catch” at Cathedral, while maintaining proper control of the train A checklist specific to Field Hill was developed in 1998 to be used in conjunction with the Locomotive Engineer Evaluation Form to reflect special requirements when evaluating the performance of LEs on Field Hill. These forms facilitate evaluation of LE proficiency in the use of air brakes and DBs, and are to be completed by a supervisor. After the compulsory trips are completed successfully, the trainmaster qualifies the LE, and the LE’s training record includes the “Field Hill–certified” designation. This training and certification were still in effect at the time of the occurrence.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 115 1.24.2.5 Training and experience of the inbound crew and trainmaster 1.24.2.5.1 Conductor The conductor on the inbound crew qualified after 5 months of training. During the on-the- job training period, she performed mostly yard service shifts accompanied by a qualified conductor. In addition, she took 3 trips on Field Hill and had practised approximately 8 simulator trips, but none on Field Hill. During the classroom training, the FHOP and the use of retainers were discussed but the need to observe piston position was not included, nor was the setting of retainers reinforced by in-the-field practice. On the day of the occurrence, the conductor and the LE discussed retainers and practised setting them while waiting in a siding at Keith. The conductor’s training and experience did not lead to an awareness for the need to observe piston position while setting retainers, which would have provided an indication of which brake cylinder pistons were fully retracted and would not provide the desired brake force.114 1.24.2.5.2 Locomotive engineer The LE on the inbound crew was hired in November 2005 and initially qualified as a conductor in May 2006. He started his LE training in January 2012 and qualified in August
- During his on-the-job training, he was taking 2 to 3 trips a week, coached by senior
LEs. He had followed the program specifically designed for Field Hill operations and was Field Hill–certified. 1.24.2.5.3 Trainmaster The trainmaster joined CP in 2008 as an RTC where he gained some preliminary experience dispatching the Laggan Subdivision during his first year of service. He qualified as a conductor in 2013 and as an LE in 2015. He became trainmaster in January 2016, after taking the managers’ training programs. He was not Field Hill–certified. At the time of the occurrence, he had taken over 100 trips as an LE, most of them on mountainous territory on the Cranbrook and Windermere subdivisions, and had worked on the Laggan Subdivision as a conductor. 1.25 Coaching assessments and proficiency testing CP regularly conducts coaching assessments (pre-qualification evaluations and field placement trips) on trainees and proficiency testing (efficiency tests and ride-along trips) on qualified crew members to evaluate their skills in train operation and adherence to rules and procedures.
114 Brake cylinder piston position can provide a visual indication of whether the air brake is applied on a car. An extended piston signifies that there is sufficient pressure (i.e., 3 psi) to overcome the return spring. While setting retainers, observation of brake cylinder piston extension provides an indication that there is sufficient BCP to extend the piston. If the brake cylinder piston is not extended, there is no BCP on the car and setting the retainer would be to no advantage.
TRANSPORTATION SAFETY BOARD OF CANADA 116 The investigation reviewed the results of the assessments and tests conducted for the members of the inbound crew. 1.25.1 Coaching assessments Coaching assessments are performed as part of the training program, to evaluate the performance of trainees before they qualify for their respective positions. 1.25.1.1 Inbound locomotive engineer Coaching assessments for the LE on the inbound crew were completed 12 times during his training in 2012. Of these assessments, 9 were pre-qualification evaluations and 3 were field placement trips. All were on the Laggan Subdivision. After each pre-qualification evaluation, the accompanying evaluation officer (trainmaster or road foreman) completed a report that indicated the name of the officer and the LE trainee, the date, and the trip location. The report also provided a checklist of operational tasks covered in the evaluation, such as terminal preparation, switching en route, descending a heavy or mountain grade, and CRM. A report was also completed by the LE instructor after each field placement trip. In these reports, the LE’s performance for each evaluated operational task was rated from 1 to 4. A rating of 1 meant “needs improvement,” a rating of 2 meant “developing,” a rating of 3 meant “achieved standard,” and a rating of 4 meant the task was not performed. The LE’s performance for these tasks received an equal number of 2 and 3 ratings. All reports for the pre-qualification evaluations and the field placement trips also contained constructive comments and indicated that the LE’s performance on the evaluated tasks was satisfactory. 1.25.1.2 Inbound conductor Pre-qualification evaluations for the conductor on the inbound crew were completed 26 times during her training in 2018. Out of the 26 evaluations, 3 took place while on trains operating westward on the Laggan Subdivision; the others took place either in yards or on the Red Deer Subdivision. Pre-qualification evaluations are not required to be conducted on a particular subdivision. After each pre-qualification evaluation, the trainer completed a report which indicated the name of the trainer and the conductor trainee, the date, and the train number. The report also provided a checklist of operational tasks covered in the evaluation. For each operational task, the conductor trainee’s performance was rated from 1 to 4. Eighty percent of the time, the conductor trainee’s performance was rated as a 2. The evaluation form also included a comment section, which was filled out 42 percent of the time. None of the tasks rated or comments provided were related to conditions relevant to this occurrence. 1.25.2 Proficiency tests There are 2 main methods of conducting proficiency tests for qualified crew members:
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 117 • efficiency tests, in which crew members are observed, usually from the ground, to assess their on-the-job performance and their adherence to regulations and safe work practices, and • ride-along trips, in which a supervisor observes crew members while riding in the locomotive cab. As part of proficiency testing, supervisors may also review event recorder downloads, monitor radio communications, and take radar speed measurements. Supervisors conduct proficiency tests at random, except in situations where an employee is known to require more attention. For this reason, the number of tests that an employee receives can vary from year to year, and some employees could be tested significantly more often than others, if they happen to be on duty when the trainmaster is conducting tests. 1.25.2.1 Efficiency tests CP’s 2019 T&E Manager Safety Accountabilities document specifies that each trainmaster must conduct 10 efficiency tests per week, or 40 per month.115 The document does not specify the number of efficiency tests to be taken for each supervised employee. The results of the efficiency tests for the inbound crew are shown in tables 19 and 20. The investigation determined that failed tests were not assessing operational tasks relevant to the occurrence. Table 19. Results of efficiency tests for the inbound locomotive engineer, 2012 to 2018 Year Number of tests taken Number of tests passed Number of tests failed 2012 3 3 0 2013 40 31 9 2014 45 45 0 2015 34 31 3 2016 36 35 1 2017 29 27 2 2018 15 15 0
115 Canadian Pacific, T&E Manager Safety Accountabilities (01 February 2019).
TRANSPORTATION SAFETY BOARD OF CANADA 118 Table 20. Results of efficiency tests for the conductor, 2018 to 2019 Year Number of tests taken Number of tests passed Number of tests failed 2018 30 28 2 2019 2 2 0 1.25.2.2 Ride-along trips At CP, all active train and engine employees on the territory are expected to be accompanied by a supervisor for a train ride-along at least once every 12 months. CP’s 2019 T&E Manager Safety Accountabilities document, which was in effect at the time of the occurrence, specifies that trainmasters are required to ride with LEs and conductors to ensure crew proficiency and compliance 2 times per week or 8 times per month.116 The results of ride-along trips are recorded on trip evaluation reports. These reports include date, time, names of employee and officer, and test code. The performance of the employee is indicated as a simple pass or fail, based on a subjective assessment by the trainmaster; there are no additional comments that could indicate areas in which the employee’s performance was especially commendable, or identify weaknesses and promote corrective measures. From the time he qualified in 2012 to the day of the occurrence, the LE on the inbound crew was accompanied by a supervisor on 39 ride-along trips (Table 21). Table 21. Number of ride-along trips taken by the locomotive engineer on the inbound crew from 2013 to the day of the occurrence Year Number of trips 2013 8 2014 11 2015 4 2016 5 2017 5 2018 6 From the time she qualified in 2018 to the day of the occurrence, the conductor on the inbound crew was accompanied by a supervisor on 9 ride-along trips. The TSB requested the results of these trips, but CP was unable to provide them; the documentation stated that the results were “unknown.”
116 Ibid.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 119 1.26 Best practices in developing competence The Rail Safety and Standards Board in the United Kingdom published a guidance document entitled Good Practice Guide on Competence Development.117 The guide, developed in consultation with the railway industry, was intended to provide best practices for developing comprehensive systems to manage competence rather than simply ensuring compliance with regulations. “Competence” refers to the overall ability to function effectively in a position and results from the combination of functional, technical, and non-technical skills. According to the guide, non-technical skills include situational awareness, decision making, and workload management, which have been shown to play a key role in incidents and accidents. The Office of Rail Regulation in the United Kingdom published a guide entitled Developing and Maintaining Staff Competence. The guide recognizes that training programs should be sufficient to prepare individuals to handle expected operations and that experience, obtained under supervision, allows individuals to carry out progressively more complex tasks. Training and development seek to create a level of competence for the individual or team, sufficient to allow individuals or teams to undertake the operation at a basic level. Initially, this will be under direct supervision, which will become less direct. Over time, as knowledge and practical experience grow, operations can be carried out at a more complex level.118 The guide recognizes that competence development is an important contributor to managing risks, specifying that the first step in developing a competence management system is to identify activities that affect operational safety and that are critical for controlling risk. This makes it possible to identify a combination of risk control measures and to take actions to develop competence where it is required to manage risks. 1.27 Previous recommendation concerning employee qualifications The 17 June 2016 occurrence at the Canadian National Railway Company MacMillan Yard in Vaughan, Ontario, involving an uncontrolled movement during remote control locomotive system operations, highlighted deficiencies in the EQS Regulations.119 Following the TSB investigation into this occurrence, the Board recommended that
117 United Kingdom Rail Safety and Standards Board, Document RS100, Good Practice Guide on Competence Development, Issue 1 (March 2013). 118 United Kingdom Office of Rail Regulation, Railway Safety Publication 1, Developing and Maintaining Staff Competence, second edition (2007), p. 2. 119 TSB Rail Transportation Safety Investigation Report R16T0111.
TRANSPORTATION SAFETY BOARD OF CANADA 120 the Department of Transport update the Railway Employee Qualification Standards Regulations to address the existing gaps for railway employees in safety-critical positions related to training, qualification and re-qualification standards, and regulatory oversight. TSB Recommendation R18-02 In its January 2021 response to this recommendation, TC said that it was in the process of identifying amendments to the EQS Regulations, and that stakeholder consultations on the proposed amendments would be launched by March 2021. In March 2021, the Board assessed TC’s response to Recommendation R18-02 as having Satisfactory Intent.120 1.28 Crew resource management CRM is a method of making effective use of available resources (human, hardware, and information) to mitigate emergent threats, such as abnormal equipment function or lapses in human performance, by putting into practice technical proficiency, teamwork, situational awareness, communication, and personal assertiveness. CRM focuses on providing crews with the interpersonal skills required to carry out their tasks safely: “CRM training typically consists of an ongoing training and monitoring process through which personnel are trained to approach their activities from a team perspective rather than from an individual perspective.”121 Since 1998, the TSB has investigated 5 main-track train collisions in which the effectiveness of CRM practices was considered (Appendix H). 1.28.1 Crew resource management training in the rail industry Significant safety benefits have been accrued in the aviation and marine industries with the introduction of CRM. Given the prevalence of human factors in rail accident statistics, CRM training could yield significant safety benefits in the rail industry as well.122 CRM training is aimed at reducing human factors-related accidents. For example, it can provide crews with strategies to improve communication and interactions in order to align mental models,123 increase situational awareness, and counter the effects of limited resources available to problem solvers who are closest to the situation.
120 TSB Recommendation R18-02: Training and qualification standards for railway employees in safety-critical positions, at https://www.tsb.gc.ca/eng/recommandations-recommendations/rail/2018/rec-r1802.html (last accessed June 2021) 121 S. S. Roop, C .A. Morgan, T. B. Kyte et al., DOT/FRA/ORD-07/21, Rail Crew Resource Management (CRM): The Business Case for CRM Training in the Railroad Industry (United States Department of Transportation, September 2007), p. 3. 122 Ibid., pp. 4–8. 123 Mental models are internal structures developed based on several factors, including experience, knowledge, perception, and comprehension of external cues available in the work environment.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 121 Following a 1998 collision between 2 freight trains, the U.S. National Transportation Safety Board recommended that a number of railway stakeholders, including the regulator, operators, industry associations, and labour organizations, collaborate to develop and require CRM training in the railway industry. That training would cover, at a minimum, crew member proficiency; situational awareness; effective communication and teamwork; and strategies for challenging and questioning authority in an appropriate manner.124 Subsequent to this recommendation, the U.S. Federal Railroad Administration, in cooperation with academic and industry partners, developed and piloted rail CRM training.125 Initial assessment of the pilot training showed increases in knowledge and improved attitudes toward CRM principles.126 However, this type of training is not mandatory in either Canada or the U.S. A review of the adaptation of CRM principles outside of aviation in 2010 found that, in the North American railway industry, “interest in CRM training principles remains sporadic.”127 The review also described voluntary initiatives by specific railways to implement CRM training, as well as industry initiatives to develop training materials for operators to use. For example, the review indicated that CP implemented a CRM training program targeted at new-hire conductors and trainmen in 1999. 1.28.1.1 Crew resource management training at Canadian Pacific CP was one of the early adopters in the railway industry of CRM training. Since 1999, employees assigned to operational roles have undergone mandatory training in CRM, either online or via an instructor-led course. The training consists of a 1-hour presentation during the first week of the classroom portion of the conductor program and is 1 of 11 modules presented on the same day. CP’s 6-weeks training for new hires puts a special emphasis on CRM, and its principles and techniques are practised through simulations over a 2-week period. CP does not provide recurrent CRM training to its operating employees when they requalify. From CP’s perspective, since CRM principles are used daily in operations, the subject does not require recurrent training. As stated in the most recent version of the CP CRM training module, the material was developed to “…pull together all the resources available to create a process that supports
124 United States National Transportation Safety Board, Railroad Accident Report NTSB/RAR-99/02, Collision of Norfolk Southern Corporation Train 255L5 with Consolidated Rail Corporation Train TV 220 in Butler, Indiana, March 25, 1998 (1999), pp. 32–33. 125 C.A. Morgan, L.E. Olson, T.B. Kyte and S.S. Roop, DOT/FRA/ORD-07/03.I, Rail Crew Resource Management (CRM): Pilot Rail CRM Training Development and Implementation (Washington, DC: United States Department of Transportation, February 2007). 126 Ibid., pp. 22–32. 127 B.J. Hayward and A.R. Lowe, “The migration of crew resource management training,” in: B.G. Kanki, R.L. Helmreich and J. Anca (eds.), Crew Resource Management, Second Edition (San Diego, CA: Academic Press, 2010).
TRANSPORTATION SAFETY BOARD OF CANADA 122 appropriate changes in the application of rules, training, and operating practices.”128 The CRM training is divided into the following fundamental areas: • human factors • situational awareness • technical proficiency • communication • teamwork 1.28.2 Applied crew resource management At CP’s operational level, the core of CRM is expected to be practised during job briefings, in which individuals discuss operational issues and work plans. 1.28.2.1 Crew resource management and communications One of the core principles of CRM is effective communication among team members. Checklists standardize team communications by giving crew members an objective framework that provides: • a standard foundation for verifying vehicle configuration that will attempt to counteract any reduction in the crew's psychological and physical condition; • a sequential framework to meet internal and external operational requirements; • mutual supervision (cross-checking) among crew members; • the ability to dictate the duties of each crew member in order to facilitate optimum crew coordination as well as logical distribution of workload; • an enhanced team concept by keeping all crew members in the loop; and • a quality control tool by management and regulators over the crews. Operator checklists are widespread across transportation domains, notably in air and marine modes.129 However, checklists are not generally used in railway operations. 1.28.2.2 Crew resource management and situational awareness People working in operational environments make decisions by building a mental model of their operational environment. This mental model is supported by an individual’s situational awareness, which refers to “the perception of elements in the environment within a volume of time and space, the comprehension of their meaning, and the projection of their status in the near future.”130 Situational awareness is a critical component of decision making and involves information-processing stages at which shortcomings may
128 Canadian Pacific, Crew Resource Management online training (835 V4E), September 2013. 129 A. Degani and E. L. Weiner, “Cockpit Checklists: Concept, Design and Use”. Human Factors: The Journal of the Human Factors and Ergonomics Society, Vol. 35, Issue 2 (1993), pp. 28–43. 130 M. Endsley, “Toward a Theory of Situation Awareness in Dynamic Systems,” Human Factors: The Journal of the Human Factors and Ergonomics Society, Vol. 37, Issue 1 (1995), p. 36.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 123 occur. These shortcomings may result in an incomplete or inadequate perception of the situation. Accurate situational awareness represents a defence against operational hazards in complex organizations like railways. Appropriate situational awareness is based on access to the best available data that can be synthesized into useful information that front-line operators can use in decision making. In addition to policies and regulations (e.g., mandatory event reporting), a robust CRM program acts as another potential defence against systemic hazards in complex organizations. 1.28.2.3 Crew resource management and decision making Because they facilitate information sharing among team members, CRM strategies can help ensure that team interactions (i.e., communication and coordination) are effective in situations in which the command and decision-making power hierarchy is unclear or unbalanced among the team. An authority gradient131 is defined as an established or perceived distribution of power among members of a team. A steep gradient may result in a situation where decision making is centralized with a single individual, whose status, experience or decision-making style precludes consensus-based decision-making within the group. In the railway hierarchy, a train crew will normally perceive the trainmaster as the authority. Conformity is often in response to a perceived authority, or in reaction to an authoritarian leader (steep gradient). Good quality communication in the decision-making process is particularly important considering that the trainmaster’s participation is almost always remote. As such, the trainmaster’s role is “narrowly embedded” in the team, a situation in which, according to human factors research, the trainmaster depends heavily on “others for acquiring a basis for their decision making and may have little control over the authenticity or accuracy of the information provided.”132 1.28.2.4 Crew resource management as mitigation to limited resources In the context of the relationship between cognitive behaviour and human performance, human factors literature defines the concept of bounded rationality and its relationship to error.133
131 F. H. Hawkins, Human Factors in Flight, 2nd edition (Ashgate, 1993). 132 M.J. Van der Hoven (2001) cited in S. Dekker, Second Victim: Error, Guilt, Trauma, and Resilience (Routledge, 2013), p. 32. 133 D. D. Woods and R. I. Cook, "Perspectives on Human Error: Hindsight Biases and Local Rationality", in: F. T. Durso (ed.) Handbook of Applied Cognition (1999), pp. 8–9.
TRANSPORTATION SAFETY BOARD OF CANADA 124 People working in industries such as the railway industry use their knowledge and available resources to pursue their goals based on their view of the situation. Further, safety is created when people are able to successfully “pursue goals and match procedures to situations […] resolve conflicts, anticipate hazards, accommodate variation and change, cope with surprise, work around obstacles, close gaps between plans and real situations, detect and recover from miscommunications and mis-assessments.”134 The bounded rationality phenomenon partly describes the mismatch between successful human performance and the limited resources available to people at the sharp end of operations (train crews), which may result in lapses or error. People's behaviour can be viewed as “rational,” though possibly erroneous, when seen from the point of view of their knowledge, their mindset, and the multiple goals they are trying to balance.135 1.29 Safety management systems A safety management system (SMS) is a formal framework for managing risk that helps companies manage the safety of their operations by requiring them to • identify hazards, assess the level of risk they represent, and take steps to reduce those risks where required; • build a safety culture in day-to-day operations at all levels of the company; and • involve company employees by • collaborating or consulting with them; • informing them of risks and how the company has dealt with these risks; and • developing a procedure for employees to report contraventions and safety hazards to the company, and a policy for protecting employees who report contraventions and safety hazards. SMS was designed around evolving concepts about safety that are believed to offer greater potential for effective risk management. The traditional approach to regulatory oversight was based on inspections for compliance and enforcement activities. SMS, in contrast, seeks to ensure that organizations have processes in place to systematically manage risks. SMS has been progressively introduced in the Canadian transportation industry because, when combined with inspections and enforcement, it is more effective in reducing accident rates. SMS can improve safety effectiveness and efficiency because it • promotes accountability and timely remedial actions in the management of safety, without TC prescribing one-size-fits-all requirements; • enables companies to be more proactive by leveraging operational expertise to identify hazards, and assessing and reducing risks; and • enables measures to be taken to reduce risks that may exceed regulatory standards. SMS can enhance safety by companies managing safety risks before TC has to intervene, and before major safety issues emerge. SMS complements but does not replace the existing
134 Ibid. 135 Ibid, p. 9.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 125 railway safety regulatory and oversight framework. Companies must continue to meet RSA requirements and associated regulations, rules and engineering standards. 1.29.1 Railway Safety Management Systems Regulations, 2015 In May 2013, the RSA was amended to enable improvements to the Railway Safety Management Systems Regulations and the implementation of regulations pertaining to administrative monetary penalties and railway operating certificates. The Railway Safety Management System Regulations, 2015 (the SMS Regulations) came into force on 01 April 2015. Under the SMS Regulations, federally regulated railway companies must develop and implement an SMS, create an index of all required processes, keep records, notify the Minister of Transport of proposed changes to their operations, and file SMS documentation with the Minister when requested. The new regulations contain increased prescriptive requirements that outline how to achieve a result, and management-based requirements, which require the railways to develop and implement systems or processes but allows for flexibility in determining the most appropriate way to implement them based on company-specific factors. Risk management is an important component of the SMS Regulations. One aspect of risk management consists of conducting analyses of the railway operations to identify hazards and safety issues, emerging trends or recurring situations. As part of the analysis, if a trend or recurring situation identified a safety concern, a risk assessment had to be performed to determine which mitigation or control measures to implement. Section 5 of the SMS Regulations states, in part, A railway company must develop and implement a safety management system that includes … a process for identifying safety concerns; (f) a risk assessment process; … a process for reporting contraventions and safety hazards; (j) a process for managing knowledge; […]136 However, TC does not specifically define in the SMS Regulations what a safety concern is. Section 13 of the SMS Regulations states, in part, A railway company must, on a continual basis, conduct analyses of its railway operations to identify safety concerns, including any trends, any emerging trends or any repetitive [sic] situations. The analyses must, at a minimum, be based on […]
136 Transport Canada, SOR/2015-26, Railway Safety Management System Regulations, 2015 (as amended 01 April 2015), section 5.
TRANSPORTATION SAFETY BOARD OF CANADA 126 (e) any reports of contraventions or safety hazards that are received by the railway company from its employees; (f) any complaints relating to safety that are received by the railway company; (g) any data from safety monitoring technologies; […]137 Section 15 of the SMS Regulations lists the circumstances in which railway companies must conduct a risk assessment. A railway company must conduct a risk assessment in the following circumstances: (a) when it identifies a safety concern in its railway operations as a result of the analyses conducted under section 13; … when a proposed change to its railway operations, including a change set out below, may affect the safety of the public or personnel or the protection of property or the environment:
[…]
(v) a change affecting personnel, including an increase or decrease in the number of employees or a change in their responsibilities or duties.138 1.29.2 Canadian Pacific’s safety management system In accordance with the SMS Regulations, CP has developed and implemented a detailed SMS. CP’s SMS includes a hazard prevention program as well as a risk assessment policy and procedure, both of which are routinely updated and refined to support continuous improvement. With these 2 instruments, hazards can be reported, assessed, and mitigated. 1.29.2.1 Safety hazard reporting As part of CP’s SMS, and in accordance with CP’s occupational health and safety requirements under the Canada Labour Code, train crews are required to file safety hazard reports when they experience or observe events that, in their experience, represent an unsafe circumstance that could lead to an accident. CP’s Reporting Contraventions, Safety Hazards and Identifying Safety Concerns Procedure in effect at the time of the occurrence outlines the situations in which a safety hazard report should be made and an analysis conducted to identify safety concerns, emerging trends or recurring situations: a) reports of railway occurrences and pertinent supporting documentation; b) reports of contraventions and/or Safety Hazards from employees; c) results of audits/inspections conducted internally or by a Railway Safety Inspector; identifying safety concerns at CP;
137 Ibid., section 13. 138 Ibid., section 15.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 127 d) complaints relating to safety received by the Company; e) any data from safety monitoring technologies; and f) conclusions from the Annual Report prepared as per the requirements of H&S 5551 Safety Management System (SMS) Continual Monitoring procedure.139 Hazard reports are submitted by employees on paper, or electronically using the Safety Hazard Reporting application. Once a hazard has been reported, the procedure outlines the steps that should be taken to address the concern: • The report is sent to the supervisor, who then must rate the severity of the issue, resolve the issue and provide a response back to the employee within 14 days. • If not resolved, the safety hazard report goes to the workplace health and safety committee, who then has 30 days to resolve the issues and report back the results in writing to the employee. • If the issue is still not resolved, there is a multi-stage escalation process that must be done in writing, beginning at the superintendent / director / assistant chief engineer level, and culminating at the Policy Committee. Each level has 30 days to respond. • CP policy requires that all written records of the safety hazard reporting process be maintained for a period of 6 years. 1.29.2.1.1 Calgary Cross-Functional Health and Safety Committee At the Calgary terminal, many safety hazards are addressed informally between staff and supervisors. In these cases, the incidents are not captured by the Safety Hazard Reporting application. When hazard reports submitted to a supervisor are not resolved within 14 days, they are forwarded to the Calgary Cross-Functional Health and Safety Committee (CCFHSC). This committee has the authority to evaluate issues related to the Canada Labour Code, Part II and all associated occupational health and safety regulations for railways, CP’s SMS, and any health and safety provisions in the various collective agreements. The committee consists of • 6 representatives from employee union groups (Unifor diesel shop, Unifor car department, Teamsters Canada Rail Conference (TCRC) yardmen, TCRC brakemen/conductor, TCRC engineer, and United Steelworkers crew bus/clerk); and • 3 representatives from the employer (general superintendent, diesel manager, mechanical car manager)140
139 Canadian Pacific, Reporting Contraventions, Safety Hazards and Identifying Safety Concerns 2.0, (last revised 19 December 2018), section 1.0, p. 1. 140 Canadian Pacific, Calgary Alyth Cross-Functional Workplace Health & Safety Committee 2019 Terms of Reference (30 January 2019), p. 2.
TRANSPORTATION SAFETY BOARD OF CANADA 128 1.29.2.1.2 Safety hazard reports of train handling issues on Field Hill The investigation examined 3 years of the CCFHSC meeting minutes dating back to December 2016, focusing on the safety hazard reports and issues presented to the committee relating to train handling difficulties on Field Hill. The meeting minutes showed that hazard reports were not always rated by a supervisor. In addition, some reports were closed out without any clear identification of the corrective action undertaken, or any indication of verification that the action had been completed or was effective. The reported hazards discussed in the meeting minutes are summarized in Table 22. Table 22. Summary of Calgary Cross-Functional Health and Safety Committee meeting minutes (December 2016 to January 2019) Meeting month and year Summary of meeting minutes related to Field Hill December 2016 In the 14 December 2016 minutes, a new business item identified that train crews were reporting that they had to use full service, or nearly full service, braking to control speed in a manner consistent with speed restrictions. The minutes questioned whether cars were being properly maintained and/or if proper pre-departure brake tests were being conducted consistently between Alyth and Port Coquitlam yards. January 2017 The 07 January 2017 minutes mentioned a hazard report in which a grain train crew indicated having difficulty controlling the train speed on Field Hill. March 2017 The March 2017 minutes noted that the maintenance and/or pre-departure brake tests were not consistent between Alyth and Port Coquitlam yards. The action recommended for the reported train air brake issues was “better maintenance of the equipment.” April 2017 The December 2016 issue of having to use full service, or nearly full service, braking to control speed on Field Hill, and the January 2017 hazard report indicating a grain train crew having difficulty controlling speed, were listed as complete. There was no documentation to indicate what was done to list the items as complete. January 2018 New business items in the meeting minutes indicated that trains were going down Field Hill in full service during extreme cold temperatures. The minutes also indicated that the crews had been advised that it was fine to take trains down Field Hill with more than the allowable limit of flow.141 March 2018 The issue identified in the January 2018 minutes related to braking on Field Hill in extreme cold was listed as complete. The documentation indicated that a bulletin would be issued by September 2018 to keep train speed under 10 mph when temperatures are colder than −25 °C.
141 The Railway Freight and Passenger Train Brake Inspection and Safety Rules state that, while en route, corrective action must be taken if the brake pipe air flow exceeds 60 cubic feet per minute (CFM) for conventional trains (Section 7.9), or 90 cubic feet per minute for trains with supplemental source(s) of air (Section 7.11).
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 129 Meeting month and year Summary of meeting minutes related to Field Hill March 2018 The March 2018 minutes identified a new issue regarding multiple trains that were proceeding onto Field Hill without having received a No. 1 brake test on the full train consist. Five of the 10 trains identified in the minutes were westbound loaded grain trains. Records for these 5 trains showed that instead of a No. 1 brake test, a No. 1A brake test was done.142 April 2018 Four (4) additional westbound loaded unit grain trains were reported to have received a No. 1A brake test instead of the No. 1 brake test. This information was added to the list of issues identified in March 2018. May 2018 The issue identified in March 2018 was updated to include additional information regarding train 301-294 that was reported to have only had a No. 1A brake test. This train had to be placed in emergency by the LE upon leaving Cathedral. The application of the emergency brakes had been necessary because all service brake functional capacity had been used and the train was still accelerating after reaching a speed of 19 mph. June 2018 The issue noted in March 2018 regarding the No. 1 brake test was listed as complete. As a recommended action, the minutes indicated that no train was to leave Alyth Yard without a No. 1 brake test, and that the RTC should be alerted to any trains arriving with only a No. 1A brake test. The minutes stated that the action was completed and that a bulletin would be issued; however, no due date was given for this action item. August 2018 A safety hazard report indicated that train 199-09 went into emergency on Field Hill. The recommended action was to make a troubleshooting document for trainmasters, which they could use to help crews who need assistance following the Field Hill procedures. August 2018 Train crews requested that the scanner at Mile 130.2 of the Laggan Subdivision be used for observing cars with air brakes not working. September 2018 The August 2018 action to provide a troubleshooting document that trainmasters could use to help crews who need assistance following the Field Hill procedures remained open. September 2018 The issue reported in August 2018 regarding the use of the scanner at Mile 130.2 for observing cars with air brakes not working was listed as complete however, the minutes did not indicate any action taken. November 2018 The Field Hill troubleshooting document for trainmasters identified as a recommended action in August 2018 was listed as complete. The meeting minutes did not indicate the action taken. However, CP determined that the development of a troubleshooting tree for trainmasters was not required and therefore none was developed. 1.29.2.1.3 Safety hazard report on the day before the occurrence In addition to the hazards listed in Table 22, on the day before the occurrence, the LE on the relief crew reported to the RTC that he had difficulties braking while coming down Field Hill on train 303-676, a loaded unit grain train. In fact, while descending the grade, the LE had been so close to a complete loss of control that he asked the RTC to clear the track ahead,
142 The No. 1 and No. 1A brake tests verify brake pipe integrity and continuity, brake rigging condition, air brake application and release, and piston travel on each car. A No. 1 brake test is performed by a certified car inspector, whereas a No. 1A brake test is performed by qualified train crew members.
TRANSPORTATION SAFETY BOARD OF CANADA 130 including the tracks in Field. He had to fully apply the train brakes and use full locomotive DBs to maintain speed.143 The LE completed a hazard report, in which he classified the hazard as “severe,” but he had not yet had an opportunity to file it; it was discovered in the wreckage at the occurrence site after the accident. Wheel temperature data for this train taken at Mile 130.6 of the Laggan Subdivision indicated that 56% of the cars had ineffective brakes.144 Upon arrival at Field, the train was identified during an inbound inspection as having a large number of cars with the brakes not applied. 1.29.2.2 Risk assessments CP’s risk assessment procedure lists the conditions under which a risk assessment must be performed. It states, in part, • A “Safety Concern” (i.e. a hazard or condition that may present a direct safety risk to employees, or pose a threat to safe railway operations) is identified through analysis of safety data; • A proposed change to CP Operations that could: • introduce a new hazard to the workplace resulting in adverse effects; • negatively impact or contravene any existing policy, procedure, rule or work practice used to meet regulatory compliance or any CP requirements or standards; • create or increase a direct safety risk to employees, railway property, property transported by the railway, the public or property adjacent to the railway; and • require authority by a regulatory agency to implement.145 If any one of the above listed criteria is identified, this triggers a risk assessment. The procedure outlines how to assess each identified safety concern or change to operations using the CP risk assessment tool. The process involves identifying all potential hazards associated with the scope of the risk assessment and then determining all the potential undesired events that could occur as a result of exposure to the identified hazards. A risk assessment is then performed on each undesired event. Table 23 summarizes the number of risk assessments conducted by CP between 2015 and 2018 under the company SMS.
143 According to regulations, it must be possible to control train speed without relying on DBs. Rule 21.5(a) of the Transport Canada-approved Railway Locomotive Inspection and Safety Rules [03 July 2015] states: “Dynamic brake is considered a supplemental braking system however company instructions and procedures shall ensure that the friction brakes are sufficient by themselves, without the aid of dynamic brakes, to stop the train safely under all operating conditions.“ 144 See Table 14 in section 1.19.2.3. 145 Canadian Pacific, Risk Assessment Procedure, version 2.0 (last revised 30 June 2017), section 2.1.1, p. 2.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 131 Table 23. Canadian Pacific’s risk assessments under the safety management system, by risk assessment category, 2015 to 2018 Year Total risk assessments Risk assessment category Safety concern Proposed change Others 2015* 9 0 9 0 2016 26 3 23 0 2017 7 0 7 0 2018 13 1 10 2 Total 55 4 49 2
- Significant revisions to the SMS Regulations came into force in 2015.
According to CP risk assessment records for the years 2015 to 2018: • 47% of the risk assessments were conducted in 2016. • 7% were conducted as a result of a safety concern derived from an analysis of safety data. • 89% were conducted as a result of a proposed change to operations. There was no record that any analysis or risk assessment had been done following the train crews’ filing safety hazard reports in which they were documenting their difficulties in controlling unit grain trains on Field Hill. Also, there were no indications that a risk assessment was used to validate the changes made to the FHOP between 1998 and 2015. Since the new SMS Regulations came into effect in 2015, the TSB has investigated 6 other occurrences in which shortcomings in CP’s SMS were identified as a risk factor. In some, CP did not consider its operational changes to be significant enough to require a risk assessment; in others, it did not identify and mitigate all hazards (Appendix I). 1.29.2.3 Internal audit of the safety management system Internal SMS audits play a critical role in the system’s continual improvement by providing the organization with an opportunity to assess the effectiveness of its safety management processes and to proactively take corrective measures. Under sections 30, 31, and 32 of the SMS Regulations, a railway must conduct an audit of its SMS every 3 years and produce an action plan to address identified deficiencies. In 2017, CP contracted Golder and Associates to audit its SMS. The company received the audit findings on 17 July 2017. Golder and Associates did not audit for regulatory non- compliance, but rather classified its findings as major non-conformances, minor non- conformances, and opportunities for improvement (see Appendix J). The audit noted no major non-conformances. There were 3 findings related to safety hazard and risk assessment and 5 related to training and proficiency testing. Findings related to safety hazards and risk assessments: • Variability in the current practices for safety hazard reporting resulted in an incomplete or biased data set for trend analysis of safety concerns.
TRANSPORTATION SAFETY BOARD OF CANADA 132 • Information from safety committee inspections and from locally-managed safety hazard reports was not evaluated for system-wide trends and safety concerns. • There was an opportunity to conduct additional risk assessments where they could provide value or update understandings of relevant risk mitigation strategies. Findings related to training and proficiency testing: • Job aids that were used to help identify and control operational/occupational safety risks were not always complete. • Employees involved in activities that may affect railway safety did not always have appropriate training. • There was inconsistency in the performance of efficiency tests, with regard to the recording of results, failure rates, and the assignment of pass/fail grades. • Instances of incomplete communication with workers/employees during efficiency/proficiency testing were reported. • Concerns were expressed regarding the competency of CP managers/trainmasters during the execution of efficiency/proficiency tests. CP procedures were in place to address audit findings. 1.30 Regulatory oversight of railway operations Rail safety is governed by the RSA. TC promotes safe and secure transportation systems by developing safety regulations and standards, or in the case of railways, by facilitating the development of rules by the rail industry. TC is then responsible for enforcement. It also tests and promotes safety technologies and has introduced SMS regulations requiring railways to manage their safety risks. To carry out the objectives of the RSA, TC’s Rail Safety Directorate, located at TC headquarters in Ottawa, Ontario, is responsible for the development and enforcement of regulations and national standards, as well as for the implementation of monitoring, testing, and inspection programs. It also sets the direction for railway safety oversight through the development of policy and programs. Regional offices are responsible for the implementation of these nation-wide policies and programs. The planning and execution of SMS regulatory audits for the national railways (CN, CP and VIA Rail Canada Inc.) are performed by the SMS team based out of headquarters. For the federally regulated inter- regional railways, the planning and execution of SMS regulatory audits is the responsibility of regional offices. Regional offices are also responsible for conducting assessments of the railways within each region, allocating regional inspection and auditing resources, and conducting any follow-up activities to ensure that the railways comply with the rules and regulations and are operating safely. The Prairie and Northern Region (PNR) is responsible for oversight of CP’s Laggan Subdivision. Regional railway safety inspectors monitor and promote regulatory compliance regarding railway operations, equipment, infrastructure, and grade crossings.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 133 The tools and strategies available to TC to monitor the level of safety and compliance within the industry include • inspections to verify compliance with rail safety regulatory requirements, to collect data, and to identify threats to rail safety that require corrective action; • safety audits to verify compliance with regulatory requirements and to assess safety performance; and • SMS audits to examine the company's SMS, or a portion of it, to assess its effectiveness and determine whether the company's actual operations conform to the procedures it developed to demonstrate compliance with applicable regulatory requirements. Inspections and audits are complementary processes. While inspections look at conditions, audits look at systems and processes. Inspections can be used to help target future audits and to help monitor the corrective action taken following previous audits. 1.30.1 Safety inspections conducted by the Prairie and Northern Region 1.30.1.1 Car safety and maintenance inspections From 2014–15 to 2018–19, TC PNR conducted car safety and maintenance inspections, as a part of its overall inspection program. Table 24 provides the inspection data (number of cars inspected and rate of defects identified)146 for 3 groups of cars: CP covered hoppers, all railway covered hoppers and all cars handled by CP. The data for CP covered hopper cars is a subset of the other 2 groups. The inspections were conducted in accordance with the Railway Freight Car Inspection & Safety Rules. Table 24. Transport Canada’s Prairie & Northern Region car inspections, fiscal years 2014–15 to 2018–19 Fiscal year Canadian Pacific covered hopper cars All railway covered hopper cars All Canadian Pacific cars Cars inspected Defect rate Cars inspected Defect rate Cars inspected Defect rate 2014–15 645 14% 1015 13% 839 19% 2015–16 693 10% 1174 12% 869 14% 2016–17 335 10% 655 20% 455 14% 2017–18 591 13% 993 17% 692 16% 2018–19 1417 15% 1935 13% 1528 17% 5 years 3681 13% 5772 14% 4383 16%
146 A defect refers to all safety defects, including but not limited to brake defects, identified during a safety inspection as per the Railway Freight Car Inspection & Safety Rules.
TRANSPORTATION SAFETY BOARD OF CANADA 134 1.30.1.2 Inspections of No. 1 brake test TC’s PNR began conducting No. 1 brake test inspections in June 2016. According to records provided, from 2016–17 to 2018–19, the inspectors checked 58 trains and identified 2 trains with less than 95% of the train brakes operative (3% defect rate). 1.30.2 Audits of Canadian Pacific’s safety management system 1.30.2.1 Framework for the audits TC’s framework for conducting SMS audits of railways consists of the following phases: • Plan: Planning includes data collection (data from TC and external sources like the TSB), selection of areas to audit and audit locations, with input from the railway. • Conduct: Execution of the audit, including document reviews and interviews. While many of the documents are provided as part of a formal request, there are also items that come up in the course of an audit that will result in the review of other documents. • Report: A draft report is prepared and circulated to the company for review and comment. The intent is to ensure accuracy. TC considers the response from the company and then produces a final report. Companies are required to respond to the findings in the final report with a corrective action plan. • Follow-up: TC reviews the railway’s corrective action plan, and there are ongoing communications between TC and the railway on its plan.147 In 2016, TC incorporated new safety data and regional risk information into its planning tools. A national review process to monitor all operators on compliance and ongoing safety issues was established to support more frequent and thorough SMS audits. TC has committed to auditing all elements of all Class 1 railways’ SMS on a 3- to 5-year cycle. In 2016–17, TC commenced the first cycle of railway SMS audits under the new SMS Regulations. The manual for conducting SMS audits, which was finalized and published in November 2017, outlined audit findings as follows: Non-compliance will indicate that one or more regulatory requirements has not been met; and deficiencies will identify when a railway has gaps in or has not fully carried out one or more of the processes, procedures, plans, or methods established for their safety management system (SMS).148 An audit report may also discuss opportunities for improvement. They allow the audit team to comment on the quality of a company’s SMS. An opportunity for improvement is discretionary and does not form part of the audit findings. Once the audit is complete, a draft report is provided to the railway for review and correction of factual errors. A final report is forwarded to the railway, and the railway
147 Transport Canada, Safety Management System Audit Manual, 10 November 2017, p. 10. 148 Ibid., p. 7.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 135 replies with a corrective action plan within 30 days. The corrective action plan documents the company’s commitments and sets completion targets. TC’s procedure indicates that it conducts follow-up of individual audits to verify that corrective action plans are implemented and that the audit findings were addressed. TC keeps records of interactions, but to date, has not completed system-wide tracking or validation of its comprehensive audit findings across the industry. 1.30.2.2 Audit findings From 2016–17 and 2018–19, TC performed 3 audits of CP’s SMS, the findings of which are summarized in Table 25. Table 25. Transport Canada audit findings, by category, fiscal years 2016–17 to 2018–19 Category of finding 2016–17 2017–18 2018–19 Total Non-compliance 6 0 1 7 Deficiency 0 3 1 4 Opportunity for improvement 1 0 3 4 1.30.2.2.1 2016–17 audit In 2016–17, TC audited CP for compliance with the risk assessment process (sections 15 to 17 of the SMS Regulations), and the process for implementing and evaluating remedial action (sections 18 to 20 of the SMS Regulations). The audit identified non-compliances with the SMS Regulations. The non-compliances identified that CP • did not always evaluate the effectiveness of remedial action designed to reduce or eliminate risk; • was not reliably consulting with bargaining agents in the planning, execution and evaluation of changes to operations, risk identification and the evaluation of the effectiveness of remedial actions; • did not reliably document what consultations were done; and • did not reliably notify the Minister of a proposed change to operations that may affect safety.149 CP’s response, sent 25 April 2017, expressed reservations with the audit process. CP believed TC’s expectations were “unreasonable and inconsistent with SMS principles of continuous improvement.”150 CP was also concerned the audit did not balance SMS process strengths against the shortcomings identified. Nevertheless, CP committed to the following corrective actions:
149 Transport Canada, 2016–17 Audit Report of Canadian Pacific Railway (17 March 2017). 150 Canadian Pacific, letter from the CP Director Regulatory Affairs to the TC Director General Rail Safety (25 April 2017).
TRANSPORTATION SAFETY BOARD OF CANADA 136 • Develop and rollout an online risk assessment training program for operation managers in Canada, that will clearly define expectations regarding the consultation of bargaining agents. • Revise the risk assessment e-tool to align key roles to task, and to prompt documentation of involvement and consultation of bargaining agent. • Where necessary, review and adjust steps for evaluating the effectiveness of remedial action. • Review and revise CP health & safety procedures to ensure roles are clearly defined, clarify steps for evaluating safety action, and clarify what changes require Ministerial notification. 1.30.2.2.2 2017–18 audit In 2017–18, as part of the risk-based planning process, TC evaluated CP’s process for ensuring compliance with regulations and other instruments (sections 10 and 11 of the SMS Regulations), and its process for managing knowledge (sections 25 to 27 of the SMS Regulations). The audit resulted in 0 non-compliances and 3 deficiencies regarding the process for managing knowledge: • CP’s method for verifying employees were skilled and qualified for their duties had not been fully implemented. • CP’s method for ensuring that third parties operating on CP track had the required knowledge was not fully implemented. • CP’s method for verifying knowledge of third-party contractors working on CP property, but not working for CP, was not sufficiently detailed. TC qualified its audit, noting that employees filling recently staffed positions did not have all the required skills and qualifications for their duties. For instance, in Winnipeg, 14 out of 22 employees in the position of trainmaster, assistant superintendent operations, or superintendent operations did not possess the required skills of an LE. TC did not define this situation as a deficiency or non-compliance.151 ,152 1.30.2.2.3 2018–19 audit In 2018–19, TC audited CP’s compliance with the SMS Regulations with respect to the following processes: the process for managing railway occurrences (section 12 of the SMS Regulations), the process for identifying safety concerns (sections 13 and 14 of the SMS Regulations), the process for establishing targets and developing initiatives (sections 21 to 23 of the SMS regulations), and the process for reporting contraventions and safety hazards (section 24 of the SMS regulations). The audit resulted in 1 non-compliance and 1 deficiency:
151 Transport Canada, 2017-18 Audit Report of Canadian Pacific Railway (15 March 2017). 152 Canadian Pacific, letter from the CP Director Regulatory Affairs to the TC Director General Rail Safety (25 April 2017).
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 137 • With respect to the process for establishing targets and developing initiatives, the audit found that CP’s SMS annual report to the accountable executive did not include conclusions of monitoring activities specifically related to safety targets. • With respect to the process for reporting contraventions and safety hazards, the audit found that CP did not sufficiently communicate the introduction of the A-line (alert line), the company’s new option for anonymous reporting of contraventions and safety hazards without fear of reprisal. The audit also identified 3 opportunities for improvement, notably: • In practice, workplace health and safety committees (WHSC) are restricted to investigations of fatal and disabling injuries; the CP procedure sets this restriction, but also requires the WHSC to participate in any occurrence that requires medical treatment (as required by Part II of the Canada Labour Code, 136(5)(g)). • CP’s discrimination and harassment policy should better prioritize the company’s commitment to addressing potential instances of retaliation. • WHSC minutes demonstrate that employee safety concerns are being reviewed, but do not consistently document actions taken. 1.30.3 Previous recommendation concerning audits of the railway safety management system Following its investigation into the Lac-Mégantic accident in July 2013, which directly caused the death of 47 people and destroyed the town’s core and main business area,153 the Board indicated that, with the new SMS Regulations to be adopted in 2015, TC had a legal and conceptual framework to require SMS implementation, but equally important was how the regulator would use these tools and what action it would take in the coming years. Furthermore, the Board stated that, until Canada's railways make the cultural shift to SMS, and TC ensures that the railways have effectively implemented SMS, the safety benefits from SMS would not be realized. The Board therefore recommended that the Department of Transport audit the safety management systems of railways in sufficient depth and frequency to confirm that the required processes are effective and that corrective actions are implemented to improve safety. TSB Recommendation R14-05 In its February 2021 response to this recommendation, TC indicated that, as of December 2020, it had completed its initial comprehensive audit of all federally regulated railways, which it had started in fiscal year 2016–17. As a result of these audits, TC requested corrective action plans where necessary, and it continues to follow-up to ensure that all railways have taken corrective action to address the findings. TC’s response also indicates that, in June 2020, it approved a targeted audit framework for measuring the effectiveness of SMS processes, which is in the early stages of implementation.
153 TSB Railway Investigation Report R13D0054.
TRANSPORTATION SAFETY BOARD OF CANADA 138 In its March 2021 assessment of TC’s response, the Board stated that it was encouraged by TC’s progress and looked forward to receiving information on the findings related to the effectiveness of federal railways’ SMS. Therefore, the Board considered the response to Recommendation R14‑05 to show Satisfactory Intent.154 1.30.4 Regulatory oversight of occupational health and safety Part II of the Canada Labour Code (the Code) defines occupational health and safety standards for employees working in a federally regulated business. In a pamphlet summarizing the Code, Human Resources and Skills Development Canada provides the following information: The purpose of Part II of the Canada Labour Code is to prevent workplace-related accidents and injury, including occupational diseases. […] Through the provisions of the Code, employees have the right to be informed of known or foreseeable hazards in the work place and to be provided with the information, instruction, training and supervision necessary to protect their health and safety. […] Through their health and safety committee or representatives, employees are given the right to have access to government or employer reports relating to the health and safety of employees, […].155 The Canada Labour Program is a portfolio of Employment and Social Development Canada.156 The program promotes safe, healthy, cooperative and productive workplaces by fostering good working conditions, constructive labour-management relations and workplaces free from discrimination. A memorandum of understanding (MOU) was established in 1988 between Human Resources Development Canada – Labour Branch (HRDC–Labour) and TC to provide a joint administrative arrangement for the application and enforcement of the Canada Labour Code, Part II in the federal transportation sector. One of the principles of the MOU is that
154 TSB Recommendation R14-05: Auditing of safety management systems, at https://www.tsb.gc.ca/eng/recommandations-recommendations/rail/2014/rec-r1405.html (last accessed January 2022). 155 Human Resources and Skills Development Canada, Information on Occupational Health and Safety – Pamphlet 1, Summary of Part II of the Canada Labour Code at https://www.canada.ca/en/employment-social- development/services/health-safety/reports/summary.html (last accessed on 26 January 2022). 156 The department of Human Resources and Skills Development Canada was rebranded as Employment and Social Development Canada (ESDC) by the coming into force of the Economic Action Plan 2013 Act, No. 2.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 139 [b]oth departments will work together to achieve the purpose of the Code which is "to prevent accidents and injury to health arising out of, linked with or occurring in the course of employment".157 This is achieved by separating the responsibility for the application and enforcement of the Code in the federal transportation sector as follows: HRDC–Labour is responsible for off- board employees; and TC, on behalf of HRDC–Labour and pursuant to the MOU, is responsible for on-board employees.158 At least once every 3 years, TC conducts an on-site inspection of every railway company’s health and safety committee activities with respect to employees who are subject to the On Board Trains Occupational Health and Safety Regulations.159 Prior to this occurrence, the last inspection of CP’s CCFHSC had been conducted on 14 January 2016. No non-compliances were noted. 1.31 Safety culture A recognized definition of an organization’s safety culture is “shared values (what is important) and beliefs (how things work) that interact with an organization’s structures and control systems to produce behavioural norms (the way we do things around here).”160 The safety culture of an organization is the result of individual and group values, attitudes, perceptions, competencies, and patterns of behaviour that determine the commitment to, and the style and proficiency of, an organization’s health and SMS. An effective safety culture includes proactive actions to identify and manage operational risk. There are many descriptions of what constitutes a supportive and effective safety culture. One characterization describes 4 elements:161 • Reporting culture: Hazards, occurrences, and safety issues are freely reported within the organization without fear of reprisal. • Just culture: Normal human error is viewed as a systemic problem and therefore is not punished. Malicious behaviour or negligence is punished. The methods of making the distinction are clearly stated and understood.
157 Memorandum of Understanding Between Human Resources Development Canada and Transport Canada Respecting the Application and Enforcement of the Canada Labour Code, Part II at https://tc.canada.ca/en/aviation/commercial-air-services/workplace-health-safety-onboard-aircraft/mou- between-hrdc-tc (last accessed 18 November 2021). 158 An on-board employee is a person who is working on board a train while in operation, as defined in Annex 1 of the MOU, and an off-board employee is a person who is not working on board a train while in operation. Both on-board and off-board employees are covered by the Canada Occupational Safety and Health Regulations made pursuant to the Code. 159 Employment and Social Development Canada, SOR/87-184, On Board Trains Occupational Health and Safety Regulations. 160 B. Uttal, “The Corporate Culture Vultures,” Fortune (17 October 1983), pp. 66–72, as cited by J. Reason in Managing the Risks of Organizational Accidents (Ashgate Publishing, 1997), p. 192. 161 International Civil Aviation Organization, Doc 9859, Safety Management Manual (2006), p. 4-15.
TRANSPORTATION SAFETY BOARD OF CANADA 140 • Learning culture: The organization and individuals within it are continually learning to improve operational skills and to better understand their role in safety management. Lessons learned through experience are actively shared throughout the organization. • Informed culture: Hazards and risks associated with an operation are well understood and people within an organization are provided with the necessary knowledge and skills to work safely. Employees understand how to participate in the safety management of the organization. Aspects of a company’s culture are revealed in its selection policies, operating procedures, and operational oversight, all of which can affect human performance. Practices that encourage operator responsibility, professionalism, and participation in safety matters can enhance operator attention to safety details; punitive practices do not. The way the process of issuing blame hinders the learning process is explained as follows: “where there is blame, there is no learning […] open minds close, the inquiry tends to cease, and the desire to understand the whole system diminishes.”162 In April 2016, the TSB held a Transportation Safety Summit that brought together more than 70 senior executives and leaders representing operators, labour organizations, industry associations, and regulators from all modes of transportation. A broad consensus emerged from the discussions that, to effectively improve safety, SMS must clearly identify the systemic issues underlying behaviour. Further, effective communication and collaboration were key elements in building the trust necessary to address safety issues at this level. However, the biggest challenge identified in terms of bringing about this type of “just” culture was the need to build trust and respect in organizations that may have a history of blame.163 1.31.1 Canadian Pacific’s safety culture In parallel with implementing an SMS, CP recognized the importance of building an effective safety culture. To help strengthen its safety culture, CP introduced the Home Safe initiative, which promotes both safety engagement and feedback: “By instilling […] the importance of [employees] taking responsibility for their own safety as well as the safety of their co- workers, [CP] can better ensure everyone goes home safe after each and every shift.”164 Through CP's Home Safe initiative, all employees, including managers, are trained to offer and ask for help, warn co-workers if they believe they are putting themselves or others at risk, as well as identify, report, and remove hazards.
162 M. Paul, “Moving from blame to accountability,” The Systems Thinker, Vol. 8, No. 1 (February 1997). 163 Transportation Safety Board of Canada, TSB Transportation Safety Summit 2016 – Proceedings (21-22 April 2016), p. 7, at https://www.tsb.gc.ca/eng/qui-about/sst-tss/resume-summary.pdf (last accessed on 13 January 2021). 164 Canadian Pacific, “Culture of safety,” at https://www.cpr.ca/en/safety/culture-of-safety (last accessed on 13 January 2021).
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 141 CP's 2015 Reporting Contraventions, Safety Hazards and Identifying Safety Concerns Procedure165 specifies that employees have a responsibility to report safety hazards and contraventions and outlines the steps to be followed to report and analyze contraventions and safety hazards. The procedure states that such reporting will not result in disciplinary action, provided that it is in good faith and does not involve criminal activity, malicious intent, or false or misleading information. The procedure also provides for multiple means of reporting hazards: • verbally to a supervisor; • in writing using a safety hazard report form if a supervisor is unavailable; or • if an employee does not feel comfortable reporting directly to a supervisor, through “A-line,” CP's anonymous, confidential, and independently maintained reporting process. This procedure enables employees to report hazards and to do so without fear of reprisal, 2 key elements of an effective safety culture. When the risks associated with reported hazards are well understood and communicated, and when proactive action is taken to mitigate those risks, an organization’s safety culture becomes even stronger. At CP, train crews were actively reporting the safety hazards related to poor train braking performance on Field Hill. These reports were closed without conducting a risk assessment and with insufficient action taken by CP to address and mitigate the recurring hazard. 1.32 Similar occurrences From 1996 to 1998, 3 other occurrences involving uncontrolled train movements on Field Hill were reported to the TSB. R96C0086 – On 13 April 1996, a CP freight train handling 112 cars rolled uncontrolled down a steep grade for approximately 4 miles, between Mile 128.8 on the Laggan Subdivision (Upper Spiral Tunnel) and Mile 0.15 on the Mountain Subdivision (Field Yard). There was no derailment, and no one was injured.166 R97C0147 – On 02 December 1997, CP train No. 353-946 derailed 66 cars during an uncontrolled high-speed descent. The train entered the east portal of the Upper Spiral Tunnel at about 25 mph and continued to accelerate. Sixteen cars derailed inside the Upper Spiral Tunnel, and, at Mile 134.4, 50 other cars derailed while the train speed was close to 47 mph. The 3 crew members were not injured.167 R98C0001 – On 02 January 1998, a 112-car CP freight train travelled uncontrolled between Mile 128.9 (Upper Spiral Tunnel) and Mile 136.6 (Field), reaching a speed of 42 mph. There was no derailment, and no one was injured.
165 Canadian Pacific, Reporting contraventions, safety hazards and identifying safety concerns procedure (Procedure #H&S 5552), Version 4 (effective 26 November 2015, revised 20 December 2018). 166 TSB Railway Investigation Report R96C0086. 167 TSB Railway Investigation Report R97C0147.
TRANSPORTATION SAFETY BOARD OF CANADA 142 1.33 TSB statistics on occurrences involving unplanned or uncontrolled movements From 2010 to 2019, there were 589 occurrence reports to the TSB related to unplanned or uncontrolled movements168 on all federally regulated railways in Canada (Table 26). Table 26. Unplanned and uncontrolled movements reported to the TSB, 2010 to 2019 Type of unplanned or uncontrolled movement 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 Total Loss of control 2 3 0 3 0 1 4 2 5 1 21 Switching without air brakes 10 16 12 24 21 22 18 21 27 31 202 Insufficient securement 25 32 44 42 38 37 29 39 34 46 366 Total 37 51 56 69 59 60 51 62 66 78 589 Note: The data summarizing the number of uncontrolled movements each year have not been adjusted to account for variations in the volume of rail traffic. Uncontrolled movements generally fall into one of the following causal categories:
- Loss of control: When an LE or remote control operator cannot control a locomotive,
a car, a cut of cars, or a train when using the available air brakes of the locomotive or train, or both.
- Switching without air brakes: When a movement is being switched using the
locomotive independent brakes only, with no air brakes available on the cars being switched. The vast majority of these incidents occur in rail yards.
- Insufficient securement: When a car, a cut of cars, or a train is left unattended and
begins to roll uncontrolled, usually due to • an insufficient number of hand brakes applied to a car, a cut of cars, or a train, or • faulty or ineffective hand brakes on a car (or on several cars). Of the 589 occurrences, • loss of control was the main factor in 22 (4%) of the cases, including this one, • switching without air brakes was the main factor in 202 (34%) of the cases, and • insufficient securement was the main factor in 365 (62%) of the cases. Since 1994, the TSB has investigated an additional 36 occurrences that involved uncontrolled movements, including this one, of which 14 (39%) were due to a loss of control (Appendix K).
168 From the Transportation Safety Board Regulations (SOR/2014-37), Part 1, Reports, Mandatory Reporting, Accidents, subsection 5(1): “The operator of the rolling stock, the operator of the track and any crew member that have direct knowledge of a railway occurrence must report the following railway occurrences to the Board: […] h) there is an unplanned and uncontrolled movement of rolling stock […]”
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 143 1.34 Previous recommendation and safety concern regarding uncontrolled movements The Board has made 1 recommendation relating to runaway trains resulting from improper equipment securement under its definition of uncontrolled movements. As a result of the TSB investigation into the Lac-Mégantic accident in July 2013,169 the Board recommended that the Department of Transport require Canadian railways to put in place additional physical defences to prevent runaway equipment. TSB Recommendation R14-04 This recommendation specifically focuses on the insufficient securement of rolling stock. In response, TC has implemented several initiatives, including reinforced CROR Rule 112 securement requirements and the introduction of a comprehensive monitoring plan for this new rule. In its March 2021 assessment of TC’s response, the Board stated that, despite actions taken, the current defences have not been sufficient to significantly reduce the number of uncontrolled movements to improve safety. Until the consultations with the railway industry and its labour representatives have occurred, strategies have been developed and physical defences are implemented, uncontrolled movements will continue to pose a risk to the rail transportation system. The Board assessed TC’s response to Recommendation R14-04 as being Satisfactory in Part.170 As a result of the investigation into the 2016 uncontrolled movement of equipment on the main track in Saskatoon, Saskatchewan,171 the TSB determined that the desired outcome of significantly reducing the number of uncontrolled movements has not yet been achieved despite initiatives by TC and the industry. Consequently, the Board issued the following safety concern: The Board is concerned that the current defences are not sufficient to reduce the number of uncontrolled movements and improve safety. 1.35 TSB Watchlist TSB Watchlist 2020 identifies the key safety issues that need to be addressed to make Canada’s transportation system even safer. This occurrence points to 3 of these issues. 1.35.1 Unplanned/uncontrolled movement of railway equipment Unplanned/uncontrolled movement of railway equipment is a Watchlist 2020 issue. Unplanned/uncontrolled movements of railway equipment create high-risk situations that may have catastrophic consequences. From 2010 to 2019, the trend of
169 TSB Railway Investigation Report R13D0054. 170 TSB Recommendation R14-04: Prevention of runaway trains: Unattended equipment, at https://www.bst- tsb.gc.ca/eng/recommandations-recommendations/rail/2014/rec-r1404.html (last accessed on 18 November 2021). 171 TSB Railway Investigation Report R16W0074.
TRANSPORTATION SAFETY BOARD OF CANADA 144 unplanned/uncontrolled movements was on an upward trajectory, with a peak of 78 occurrences in 2019 (Figure 46). Figure 46. Occurrences involving unplanned/uncontrolled movement of rail equipment, 2010 to 2019 (Source: TSB)
- Upward trend in occurrences over the period (τb = 0.6293, p = 0.0119). Sen’s estimate of slope is an
unbiased estimator of the true slope of the trend line. TC and the railway industry have taken some significant actions with additional administrative defences to prevent these occurrences, and actions to mitigate them through the use of physical defences such as derail devices where appropriate. However, the desired outcome—to reduce the number of these types of occurrences—has not been achieved. 1.35.2 Safety management Safety management is a Watchlist 2020 issue. Federally regulated railways have been required to have an SMS since 2001, and regulatory requirements were significantly enhanced in 2015. However, since then, companies’ SMS have not produced the expected safety improvements associated with mature safety management and safety culture, as the rate of main-track train accidents has not improved. Recent TSB investigations have identified numerous shortcomings where hazards were not identified and effective risk-mitigation measures were not taken (TSB rail transportation safety investigations R17D0123, R17W0267, and R18H0039). The TSB believes that railway ACTIONS REQUIRED Unplanned/uncontrolled movement of railway equipment While all three categories of unplanned/uncontrolled movements share some common causes, they each require unique strategies either to prevent the occurrences from happening or to reduce the associated risks. TC, the railway companies, and labour unions must collaborate, devise strategies, and implement physical and administrative defences to address each type of uncontrolled movement. For the safety of railway workers and the public, the TSB wants to see a downward trend in the number of such occurrences. RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 145 companies’ SMS are not yet effectively identifying hazards and mitigating risks in rail transportation. 1.35.3 Regulatory surveillance Regulatory surveillance is a Watchlist 2020 issue. Some transportation companies are not managing their safety risks effectively, as evidenced by increases in the main-track train accident rate, the number of uncontrolled movements, and the recent number of employee fatalities. Furthermore, TC’s follow-up and intervention is not always effective at changing unsafe operating practices. 1.36 TSB laboratory reports The TSB completed the following laboratory reports in support of this investigation: • LP213/2019 – Brake control valve examination • LP192/2019 – Wheels examination • LP075/2020 – Train dynamic analysis • LP214/2019 – Handbrake testing and human performance assessment • LP014/2022 – Brake retarding force calculations
ACTIONS REQUIRED Safety management will remain on the Watchlist for the rail transportation sector until safety data is collected and analyzed to reliably determine risk assessment and risk mitigation, leading to measurable safety improvement. ACTIONS REQUIRED Regulatory surveillance will remain on the Watchlist for the rail transportation sector until TC oversight validates whether operator safety management systems are effective—i.e., that operators are identifying hazards and assessing risks, that effective risk-mitigation measures are being implemented, and that operators are validating the effectiveness of implemented safety actions. Moreover, when operators are unable to manage safety effectively, TC must intervene in a way that changes unsafe operating practices.
TRANSPORTATION SAFETY BOARD OF CANADA 146 2.0 ANALYSIS 2.1 Introduction Canadian Pacific Railway Company (Canadian Pacific or CP) train 301-349 began to roll on its own after having been stopped on the mountain grade of Field Hill, British Columbia (BC), in extreme cold temperatures with its brakes applied in emergency for 2 hours 52 minutes. Hours earlier, as the entire train entered the steepest part of the grade at Mile 125.6 on the Laggan Subdivision near Partridge, BC, the inbound locomotive engineer (LE) was not able to maintain the train speed at or below the permissible speed of 15 mph. When the train speed had increased to more than 5 mph above the permissible speed, the crew applied the train brakes in emergency and brought the train to a stop at Mile 127.46. Almost 3 hours later, shortly after a relief crew arrived, with the brakes still applied in emergency and with retaining valves (retainers) set to the high pressure (HP) position on 84 of the 112 cars, the train commenced its uncontrolled descent down the mountain. Finding as to causes and contributing factors The train accelerated down the mountain, negotiating the steep descending grade and sharp curves, until it reached 53 mph, a speed well beyond the maximum authorized speed of the track. This excessive speed resulted in high centrifugal forces that, combined with lateral forces generated by moderate in-train buff forces, caused the locomotive to tip over in a 9.8° curve and derail at Mile 130.6. The 3 crew members on board the lead locomotive were fatally injured. The actions of the relief crew were in no way contributory to the train starting to roll uncontrolled. The analysis of this accident will focus on the following topics: • crew and supervisor training • the instructions and procedures governing Field Hill operations • the factors that led to the degradation of the performance of the air brake system on the train • the actions and decisions of the inbound crew and the trainmaster after the emergency brake application at Partridge • available braking technology that could have helped prevent the accident • crew proficiency • the history of performance issues with the air brake systems on CP grain trains during winter operations • hazard reporting and risk mitigation • regulatory oversight
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 147 2.2 The accident 2.2.1 Before the emergency stop The train crested the grade at Mile 122.4 near Stephen, BC. Once its entire mass occupied the grade, it accelerated much faster than anticipated. In an attempt to control the train’s speed, the inbound LE used a combination of locomotive dynamic brake (DB) and the lowest possible service brake application, i.e., a minimum reduction brake application, which was consistent with recommended train handling practices. Once applied, freight train automatic brakes cannot be incrementally released; rather, they can only be further applied or completely released and recharged. For this reason, LEs are taught to use the lowest possible train brake application, in combination with locomotive DB, particularly during mountain grade operations. If additional braking effort is required for speed control, small incremental brake applications (i.e., 2 or 3 psi) are commonly used to supplement the initial minimum reduction brake application. In this occurrence, however, these incremental brake applications were ineffective, and the train continued to accelerate. Finding as to causes and contributing factors Once the train passed Mile 126, it had entered one of the steepest grades on Field Hill. At this point, the sequence of service brake applications made by the inbound LE, combined with the available locomotive DBs, could not maintain the train’s speed below the maximum allowable limit of 15 mph. Therefore, as required by company instructions, the crew applied the brakes in emergency, bringing the train to a stop on Field Hill at Mile 127.46. 2.2.2 While stopped in emergency Stopping the heavy unit train in emergency on a mountain grade, particularly in extreme cold temperature, had significant ramifications. Recovering from the emergency brake application required the crew to either use retainers to perform a release and catch on a steep descent or secure the train with hand brakes, an operation that could interrupt rail traffic for several hours. In contrast, a similar train stopped on level track would need only locomotive independent brakes to hold it stationary while the emergency brake application was recovered and the brake system was recharged. To decide on a course of action, the inbound crew and the trainmaster held a job briefing, as required by the Field Hill operating procedures (FHOP). Finding as to causes and contributing factors The inbound crew and the trainmaster opted for retainers only, and the conductor subsequently set them to the high pressure position on 75% of the cars (84 cars) per the FHOP. Because the crew were close to the end of their shift, the RTC director ordered a
TRANSPORTATION SAFETY BOARD OF CANADA 148 relief crew, who would recover the emergency brake application and complete the trip to Field. A track occupancy permit was put in effect to facilitate the transport of the inbound crew and the relief crew between Yoho and Partridge in a snow removal track unit. The members of the relief crew arrived about 2.5 hours after the train came to an emergency stop; the crew was delayed at Field because the LE opted to take a 2-hour advance call per the collective agreement and at Yoho due to problems with a switch. During this time, the train brake system’s ability to hold the train stationary continued to diminish. 2.2.3 The uncontrolled movement The relief crew and the inbound crew had a crew-to-crew transfer discussion, after which the members of the relief crew took control of the train. Before they could initiate the release and recharge of the air brakes in order to depart, they had to wait for the track occupancy permit to be cancelled. The relief LE indicated in conversation with the RTC that he would not recover the emergency brake application until it had been confirmed to him that the track ahead was not occupied. Finding as to causes and contributing factors About 10 minutes after the crew-to-crew transfer, the train began to roll on its own. The uncontrolled train gradually accelerated, reaching a speed of 53 mph. The train was able to negotiate several sharp curves, including back-to-back reverse curves; however, the train was not able to negotiate the sharp 9.8° curve immediately before the Kicking Horse River bridge and it left the rails. The locomotive overturned immediately before the bridge. The inertial force caused the locomotive to leave the curve on the high side (the right side in this case) and follow a straight-line trajectory; at the same time, the centrifugal force caused the locomotive to tip over and derail. The track structure was in good condition and solidly frozen in the ground, and did not play any role in the derailment. The rails were well anchored to the ties and no wheel scratches or gouges were visible on top, suggesting that the wheels on the outside of the curve did not climb or roll over the outside rail. In addition, there were no signs of ground contact (scratches and soil residues) on the underside of the locomotive. The absence of scratches on the top of the rail and on the underside of the locomotive is consistent with the locomotive initially tipping over and leaving the track, then sliding a distance and finally coming to rest on its left side on the riverbed. 2.3 Training Training and development seek to create a level of competence sufficient to allow individuals or teams, once they are qualified, to perform their respective duties safely.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 149 According to Sections 25 to 27 of the Railway Safety Management System Regulations, 2015 (the SMS Regulations), a railway company must also include the following in its SMS, with regard to employees who perform duties essential to safe railway operations: • a plan for ensuring that they acquire the skills, knowledge and qualifications required to perform their duties safely, and • a method for verifying that they have the skills, knowledge and qualifications required to perform their duties safely. 2.3.1 Training of the inbound crew 2.3.1.1 Conductor The conductor on the inbound crew qualified in August 2018. On the night of the occurrence, it was the inbound conductor’s 4th trip on Field Hill since qualifying. During the classroom portion of her training, she had never received simulator-based training for Field Hill. Moreover, most of her on-the-job training was spent on yard assignments. Nevertheless, she had been assigned to one of the most challenging territories in Canada and was expected to participate in job briefings and provide input regarding the best method to recover from the emergency brake application. With the ending of the Field Hill certification for conductors, and in the absence of tailored on-the-job training on Field Hill, she did not have adequate knowledge specific to mountain grade operations to offer any objective input into potential courses of action to take after the train was stopped in emergency. Given that conductor training is standardized across the railway network, it is understandable that it should cover what is common to all territories, leaving any local particularity such as the effect of extreme cold temperatures on braking systems to dedicated sessions or on-the-job training. Finding as to risk If the classroom training does not address the unique needs of the territory where the employees will be working, and if the employees do not obtain the relevant on-the-job training on that territory, then they will not be adequately prepared and sufficiently trained to perform their duties safely, increasing the risk of an accident. After the emergency stop on Field Hill, the conductor set retainers on 84 of the train’s cars, as decided during the job briefing. Setting retainers is not a task that conductors need to perform often, as it is rarely required except to facilitate a release and catch scenario after an emergency brake application on a descending heavy or mountain grade. On the day of the occurrence and for the first time, the conductor practised this task with the help of the inbound LE while waiting for another train in a siding at Keith, Alberta. Prior to that day, she had not received any training or instruction on how to set retainers, and she had not encountered this situation in the course of her duties. Checking brake cylinder pistons while setting retainers allows a conductor to note which cars have already lost all brake cylinder pressure (BCP). Without having had training that
TRANSPORTATION SAFETY BOARD OF CANADA 150 included this information, the conductor was not aware that observing piston position while setting retainers could have provided an indication of the condition of the brakes on the cars. This observation can prompt a discussion about the need for another course of action. Neither the trainmaster nor the LE raised the matter of piston position in discussion during the job briefing, nor were there instructions in the FHOP indicating that piston position should be checked when setting retainers. Finding as to causes and contributing factors Gaps in the training program meant that the inbound conductor was not aware of the need to observe brake cylinder piston position while setting retainers, and therefore retainers were likely applied to cars with ineffective brakes. 2.3.1.2 Locomotive engineer The LE on the inbound crew qualified in August 2012. During his on-the-job training, he was taking 2 to 3 trips a week, coached by senior LEs. After qualification, he returned to his previous position as a conductor and worked as a relieving LE on various subdivisions when an assignment was available. He moved permanently to the Laggan Subdivision LE spare board in 2018. LEs must be certified for the subdivision on which they operate. On the Laggan Subdivision, the certification for LEs requires approximately 3 extra months of training specifically dedicated to Field Hill operations, which includes trips to practise and qualify for the skill of descending the mountain grade and safely resuming operation when a train must be stopped on the mountain grade. The LE had followed the program specifically designed for Field Hill operations and was Field Hill–certified. CP’s Field Hill certification program does not contain a module dedicated specifically to the challenges of train operations on mountain grade in extreme cold temperature. Such training could raise awareness of the issues associated with air brake system operations in extreme cold and increase vigilance on the part of LEs when they encounter situations similar to the one the inbound crew faced in this occurrence. 2.3.2 Trainmaster training Supervision is an administrative control that supports or reinforces human factors aspects, including compliance with procedures, priorities, workload, rest requirements, engagement, and motivation. Supervisors, as authority figures, can have a significant impact on many of the factors that influence behaviours in the workplace.172 Individuals with any form of supervisory role need to be trained and competent. Competence includes technical skills as well as non-technical skills such as planning,
172 M. Fleming, Effective Supervisory Safety Leadership Behaviours in the Offshore Oil and Gas Industry, Offshore Technology Report 1999/065 (2001), prepared by Robert Gordon University for the Health and Safety Executive.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 151 communication, and delegation. Technical competence should include an understanding of the hazards and control measures associated with the work being supervised. The trainmaster was qualified as an LE through the management training program, and had worked as an LE on other subdivisions. He had worked on the Laggan Subdivision as a conductor, and had experience dispatching the subdivision as an RTC, but had not worked as a qualified LE on this subdivision. Therefore, he never received the specific Field Hill training, which includes field practice and release and catch scenarios on mountain grade. In addition, although the trainmaster had completed approximately 100 trips as an LE, he had never operated a train on Field Hill. His training and hands-on experience did not include operating unit grain trains in extreme cold temperatures on mountain grades and he had not gained an intimate knowledge of the topographic features of the territory as an LE. The available guidance in the FHOP referred to “abnormal braking conditions dictating the use of hand brakes.” The occurrence train was placed in emergency because speed could not be maintained below the maximum allowed with the service brake applications that were made; yet the trainmaster did not perceive this to be an abnormal braking condition. Additionally, ambient temperature was below −25 °C, which affects the brake system. Training programs should be sufficient to prepare individuals to respond to undesirable operating circumstances such as emergency stops on mountain grades. Finding as to causes and contributing factors The trainmaster’s training and experience did not adequately prepare him to evaluate abnormal circumstances in the complex operating environment of Field Hill. Complex operational events such as recovering from an emergency brake application on Field Hill were not historically managed by trainmasters but by road foremen. The trainmaster position and the road foreman position are complementary and both have a critical role in train operations: road foremen are specialists focused on the technical aspects of train and locomotive operations, and trainmasters are generalists who carry a diverse workload, spanning from the general supervision of LEs and conductors to the day- to-day train operations and logistics support (e.g., arranging a transport for train crews, conducting proficiency tests). The road foreman position for the Calgary terminal was vacant from 2016 to 2018. During this period, the associated responsibilities and workload were absorbed by the trainmasters, who were not required to be Field Hill–certified, experienced LEs. This represented a loss of technical expertise and experience that was not addressed, which weakened the support given to crews to ensure safe train operations, particularly during emergencies. Even though trainmasters assumed road foreman duties, they did not receive technical training and operational experience to acquire the required knowledge to ensure a smooth and safe transfer of those duties.
TRANSPORTATION SAFETY BOARD OF CANADA 152 At the time of the occurrence, there was 1 person holding the title of road foreman at the Calgary terminal, but the incumbent’s technical expertise and experience were similar to those of a trainmaster. Finding as to risk When specialist duties are transferred to a generalist position, unless technical training and operational experience bridge the gaps that exist between the 2 positions, there is an increased risk that these duties will not be performed adequately. 2.3.3 Training on crew resource management In human performance research, examples regarding teamwork indicate that “good communications within the group, a high degree of situational awareness, and a comprehensive understanding of the decision-making process by all members of the group are all prerequisites for the creation of synergy and the effective performance of the team as a whole.”173 Crew resource management (CRM) training helps crew members give and receive input so that appropriate decisions are made. CRM training is not mandatory in the Canadian rail industry, and therefore not part of the training curriculum required for conductors and LEs under the Railway Employee Qualification Standards Regulations. CP provides initial CRM training to its new operating employees. This training provides valuable information to guide employees on how to work safely; however, it consists of a 1- hour module and is given at a time when the trainees are already trying to absorb a lot of new information. The relevance of the CRM information provided may not be fully appreciated at this phase in their training, particularly without practical exercises to connect the concepts presented to their application in the field. In Canada, the Commercial Air Service Standards require scheduled airline operators to provide all flight crew members with initial and annual recurrent CRM training. VIA Rail Canada Inc. has been providing its LEs with an 8-hour CRM course followed by recurrent training every 3 years. In contrast, CP’s CRM training is not recurrent and is offered only during initial training. Without recurrent CRM training, the principles of CRM may not be reinforced beyond the initial training.
173 Royal Aeronautical Society, Crew Resource Management: A Paper by the CRM Standing Group of the Royal Aeronautical Society (1999).
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 153 Finding as to risk When operating employees do not receive adequate initial and recurrent training in CRM, including how to make decisions when authority gradients are present, crew coordination and interaction may not be effective, increasing the risk of human factors–related accidents. 2.4 The emergency stop 2.4.1 Train handling before the emergency stop 2.4.1.1 Applied air flow events Shortly after departing Alyth Yard, the inbound LE noticed an increase in air flow whenever the air brakes were applied (events known as applied air flow events). These occurred while bringing the train to a stop for train meets at Keith, Banff, and Eldon. In addition, a sudden and unexpected increase in air flow appeared shortly after making a 7 psi minimum brake pipe reduction as the head-end of the train was starting to descend Field Hill. About 8 minutes later, when the brake pipe pressure was further reduced by 3 psi, another applied flow was observed. The locomotive event recorder (LER) data for the distributed power (DP) mid-train remote locomotive indicated an applied flow of up to 35 cubic feet per minute (CFM). In addition, the DP lead and rear locomotives were maintaining the brake pipe pressure and would have been expected to have a similar amount of flow after the brakes were applied. An increase in brake pipe air flow is normally expected to occur only when the air brakes are released and while the brake pipe and car air storage reservoirs are being charged. A sudden and unexpected increase in air flow with the air brakes applied is indicative of excessive leakage or an unintentional brake release. Finding: Other Because the continuity of the brake pipe was never compromised in any way, and an unintentional brake release did not occur on the train before the derailment, the only remaining cause of the applied air flow was excessive leakage of air on one or more cars. This can result in depletion of BCP or the release of the air brakes on individual cars. 2.4.1.2 Running brake tests Section 3, item 12.1 of CP’s General Operating Instructions (GOIs) requires, in part, that a running brake test be performed on all trains to condition the brakes and verify their operability before descending grades 2% or greater.174 In addition, the CP train handling procedures for the Laggan Subdivision specify that westbound trains are to make a running brake test before arriving at Mile 113.175 This requirement ensures that the test is conducted while a train is still traversing various ascending grades with a moderate change
174 Canadian Pacific, General Operating Instructions (revised 06 September 2018), Section 3, Item 12.1. 175 Canadian Pacific, Laggan Subdivision (Incl Copithorne Spur) Train Handling Procedures (13 October 2015), Section 4.0.
TRANSPORTATION SAFETY BOARD OF CANADA 154 in elevation. Beyond Mile 113, a train starts ascending steeper grades of up to 1%, making it more difficult to properly verify brake operability due to the slowing effect caused by the more pronounced change in elevation. Once a train reaches Stephen (Mile 123.1), it starts a long and steep descent down Field Hill, during which the air brakes will remain applied for about 60 minutes before it arrives at Field (Mile 136.6). The investigation determined that the occurrence train’s automatic air brakes had been applied at 2 separate locations within 8.5 miles before reaching Mile 113. The first brake application was made while entering and bringing the train to a stop in the siding at Eldon, where the train waited for 90 minutes for 2 opposing trains to clear the area. The second brake application was made while the train was being backed out of the siding and brought to a stop at Mile 105.7. The DBs were also applied during this reverse movement, and remained applied for the last 3600 feet. Additionally, the locomotive independent brakes were gradually applied in the final 30 seconds of the movement to help bring the train to a stop just clear of the east switch. The train then resumed its westward progress with no other brake applications being made from the time the train departed Eldon to when it arrived at Mile 113. The 2 brake applications at Eldon were reviewed in the context of the requirements of the train handling procedures for the Laggan Subdivision and section 3, item 12.2 of the GOI. The GOI running brake test procedure states, in part, that the train brakes are to be applied with “sufficient force to verify the brakes are operating properly” and that “locomotive brakes should not be allowed to apply at this time.”176 The brake applications at Eldon were made in the absence of blowing snow or snow accumulation above the top of the rail, and before the train arrived at Mile 113. Given the length of time the 2 brake applications remained in effect, and the conditions that existed at the time, each of the applications would have been sufficient to condition the brakes and assess the response of the brake application, and would have allowed brake system operability to be verified. Although the DBs and independent brakes were used for part of the time the train made the reverse movement to back up clear of the Eldon east switch, these additional braking sources were not considered impediments for the LE to assess brake system operability. In contrast to the GOI section 3, item 12.2, which states that the “locomotive brakes should not be allowed to apply at this time,”177 some railways, such as the Canadian National Railway Company (CN), specifically require the locomotive brakes to remain applied during a running brake test to ensure that they are also conditioned for service.178
176 Canadian Pacific, General Operating Instructions (revised 06 September 2018), Section 3, Item 12.2. 177 Ibid. 178 Canadian National Railway Company, Locomotive Engineer Operating Manual, Form 8960 (01 May 2016), Section G: Train Handling, Item G2.6: Winter Operation - Conditioning the Brakes.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 155 When adverse weather conditions exist, such as freezing rain, snow accumulation above the top of the rail, or ambient temperatures below −15 °C,179 it is critically important to keep braking surfaces clear of ice and snow and conditioned for service, and also to verify brake system operability before descending a steep grade. However, a successful running brake test, while of fundamental benefit, does not provide insight into potential leakage issues that can increasingly reduce brake efficiency on a train descending a long steep grade. The meets at Eldon occurred earlier in the evening between 1900 and 2030, before the ambient temperature dropped into the extreme cold range, below −25 °C. When the train entered the siding, the brakes remained applied for about 35 minutes. When the train subsequently backed out of the siding, the brakes were applied for about 6 minutes. The recorded information indicated that the air brakes responded adequately during the 2 train stops; therefore, these stops would not have revealed any potential performance issue. Finding: Other The running brake test at Eldon did not reveal any consequential braking anomaly because brake system leakage had not yet been exacerbated by the extreme cold, the duration of the brake applications was not long enough for the leakage to adversely affect the air brake system performance, and the train was not on the mountain grade. The cumulative effects of excessive air brake system leakage are more severe during a prolonged air brake application and especially so in extreme cold ambient temperatures. 2.4.2 Operators’ mental model of the train’s brake effectiveness People working in complex operational environments make decisions by building a mental model of the operational environment. Because of the limitations to available data and sensory input, this mental model is never completely accurate. Normally, essential elements relating to the operation are properly accounted for, given training and experience supported by operating rules and procedures. Occasionally, however, the information required to build a mental model is corrupted or is obscured altogether, which in turn compromises a person’s mental model of a situation and thus the rest of the decision- making process. 2.4.2.1 Repeated exposure to ineffective braking Repeated exposure to a complex operational situation without adverse consequences can result in a gradual shift from a heightened state of alertness to a relaxed or normal state. Each successive exposure without adverse consequences reduces an individual's attention to the source of risk, particularly when cues used to assess the presence of risk are blurred, misinterpreted, or attributed strictly to normal variation in operating circumstances. Safety hazard reports involving poorly braking unit grain trains descending Field Hill had been submitted by train crews in January and February for a number of years. The timing of these reports indicates that the braking of these trains was intermittently and seasonally
179 Canadian Pacific, General Operating Instructions (revised 06 September 2018), Section 12.1.
TRANSPORTATION SAFETY BOARD OF CANADA 156 problematic: that is, braking performance was particularly an issue when ambient temperatures were more likely to drop below −25 °C. On 03 February 2019, the day before the occurrence, the relief LE had difficulty safely descending Field Hill on a loaded unit grain train due to poor brake performance. While descending the grade, he had been so close to a complete loss of control that he advised the RTC to clear the track ahead, including the tracks in Field. He had to make a full service application of the train brakes and use full locomotive DBs to maintain speed. After this trip, he completed a safety hazard report. In CP operations, unit grain trains were so often operating close to the limits of their braking capacity during extreme cold temperatures that braking degradation became normalized. Finding as to causes and contributing factors Since braking performance degradation occurred seasonally on CP unit grain trains in extreme cold temperature, this condition had become normalized such that it was expected that close to maximum available braking would be required while descending Field Hill. Consequently, LEs had developed a greater risk tolerance and had adapted their normal train handling practices on Field Hill on very cold days. Finding as to risk If train crews routinely operate under hazardous circumstances, such as braking performance degradation in extreme cold temperatures, each successful trip will increase risk tolerance and reduce a crew’s ability to recognize, accurately evaluate, and manage the hazards in future, increasing the risk of an accident. 2.4.2.2 Inconspicuous air flow display The Association of American Railroads (AAR) Manual of Standards and Recommended Practices stipulates that, in terms of design philosophy, the urgency of rail information conveyed by an alarm shall be indicated by the background colour (that is, alarms with red backgrounds are most urgent, alarms with yellow backgrounds are less urgent, and alarms with white backgrounds are the least urgent). Although the operator display screen in the locomotive cab included a field for brake pipe air flow, the field was not particularly conspicuous among other information displayed. The “Flow” box on the operator display screen of the occurrence locomotive showed a small white number that did not flash, change colour, or change prominence, regardless of the circumstances or the flow rate that was displayed. Even though an increase in brake pipe air flow after a train brake application is a known indicator of an unintentional release of the train brakes, the air flow meter on the locomotive’s operator display screen was not designed to change its appearance in order to draw attention to potentially problematic changes in air flow rate. Despite the absence of such cues, the railway expected LEs to monitor brake pipe air flow effectively.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 157 Finding as to risk If established design principles are not applied to the display of safety-significant information on the locomotive’s operator display screen, important cues may be missed, increasing the risk of accidents. 2.4.2.3 Diminished awareness of the importance of applied air flow events Following unexpected or abnormal mechanical events, operators’ decision making is conditioned by operational context and individual experience. Human factor literature180 describes a bounded rationality that conditions an operator’s perception based on limitations to available resources. Examples of resource limitations that operators must manage as they balance multiple and sometimes conflicting goals include adherence to a schedule, limited hours of service, and delays. En route, the inbound LE observed an increase in air flow whenever the air brakes were applied. These applied air flow events occurred while bringing the train to a stop for train meets at Keith, Banff, and Eldon. An increase in air flow was also observed while the train was descending Field Hill. The earlier events were raised by the inbound LE in discussion with the trainmaster. The trainmaster did not perceive this information to be related to the difficulty controlling the train and indicated he would look into it at a later date during a follow-up review of the LER download. After Bulletin CPSB048-13 was rescinded, the requirement to report such events was removed from crews’ immediate duties. In the rail industry, making events reportable is an administrative defence linked to operational safety and control. Consequently, removing the requirement to report applied air flow events to the RTC downgraded the significance of these events as a symptom of brake system malfunction and likely decreased vigilance on the part of the inbound LE. In complex systems, operators must process multiple forms of presented data to create a basis for operational decision making. Although the majority of normal equipment behaviour is displayed by instrumentation, discrete cues reflecting deeper system behaviour may be more difficult to perceive, especially if the result of certain interactions has not been designed into the system. Missing or misleading cues related to system behaviour may jeopardize effective situational awareness (i.e., the ability to perceive and comprehend a situation, and project its future status).181 The impact on the decision-making process may emerge as follows: • Operators may not perceive the emerging situation correctly or at all: they may not sense out-of-tolerance conditions if the system design does not map built-in warnings, cautions, or advisories to system behaviour. Alternatively, operators may perceive the emerging situation incorrectly if they determine that cues are related to other possible sources of trouble.
180 D. D. Woods and R. I. Cook, "Perspectives on Human Error: Hindsight Biases and Local Rationality," Handbook of Applied Cognition (1999), pp 8–9. 181 M. Endsley, “Toward a Theory of Situation Awareness in Dynamic Systems,” Human Factors: The Journal of the Human Factors and Ergonomics Society, Vol. 37, Issue 1 (1995), p. 36.
TRANSPORTATION SAFETY BOARD OF CANADA 158 • Operators may perceive, but not comprehend the situation: e.g., applied air flow events can be linked to extraneous environmental factors that have an impact on the performance of the braking system. • Operators may comprehend certain cues but may not be able to forecast how the situation may be compounded later: e.g., applied air flow events may be linked to the performance of the braking system but not to the performance of the retainers (i.e., the ability of the retainer to effectively preserve residual BCP required that residual BCP is present at the time the retainer is set). Finding as to causes and contributing factors Although the applied air flow events were noticed and discussed, their significance as a leading indicator of brake system malfunction may not have been fully understood, resulting in a missed opportunity to accurately diagnose the diminishing effectiveness of the train’s air brake system. 2.4.3 Braking degradation on the train The investigation determined that multiple underlying factors contributed to, or resulted in, a degradation of the train’s braking performance, most notably leakage from the air brake system components (brake cylinder, car control valve, brake pipe, auxiliary/emergency reservoir), weak response to small incremental brake pipe pressure reductions, unintentional brake release, and aging equipment. Several of these conditions were exacerbated by the extreme cold temperature and reduced the margin of safety while the train was operating down the mountain grade in extreme cold temperatures. Data from several sources were reviewed and analyzed in assessing the condition of the train’s braking system: • post-derailment rolling stock conditions • LER data • results of brake effort calculations and train dynamic simulations • results from a series of tests performed on the locomotive and 13 grain cars recovered from the accident site • wheel temperature measurements for the cars on the occurrence train based on previous trips under different ambient temperature conditions 2.4.3.1 Air leakage from the brake cylinder The leakage of compressed air is expected to occur from a rail car, particularly during the colder winter operating season. The leakage rate can vary considerably from car to car depending on several factors. Most of the leakage that may occur will not interfere with the proper operation of the car’s air brake system, nor is it detrimental to the car’s brake effectiveness. The brake cylinder, however, is one air brake component that can be critically affected by leakage. The loss of BCP on a car due to leakage will reduce the brake force provided by the car. A brake cylinder that has a significant amount of leakage may completely bleed off to the point where the brake shoes no longer contact the wheel tread
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 159 surface, rendering the brakes completely ineffective. A car that does not provide the expected amount of braking force does not fully contribute to the retarding force on a train. The brake cylinders on a car are only pressure maintained to a maximum of approximately 8 to 12 psi, regardless of the air brake application in effect. Brake cylinder leakage can be particularly problematic for a heavy weight train descending a long grade where the air brakes will remain applied for a longer duration. The maximum allowable brake cylinder leakage is 1 psi per minute during a 1-minute waiting time, per AAR Standard S-486, “Code of Air Brake System Tests for Freight Equipment - Single Car Test.” With leakage of air from the brake cylinder, even within acceptable limits, the force exerted by the piston is reduced, resulting in less effective braking on that car. Brake cylinder leaks are worsened by the deterioration of packing cup gaskets due to aging and wear, as well as by the degradation of the grease lubricating the packing cup system. These leaks are accentuated in cold temperatures, when rubber packing cups, gaskets, and grease harden and contract. There is no requirement to perform periodic maintenance on rail car brake cylinders. Therefore, brake cylinders can remain in service for long periods of time. During a series of incremental service brake applications on the 13 recovered grain cars performed after the occurrence, BCP dropped to 21 psi, or 57% of the theoretical maximum, after 19 minutes of sustained operation. These results strongly suggest that the air brake system on these cars would not have provided adequate braking effectiveness, therefore compromising the safe operation of a loaded unit grain train in a situation where the air brakes would need to remain applied for an extended duration, such as while descending a long mountain grade. Post-occurrence testing determined that the depletion of the BCP on about 50% of the 13 recovered grain cars after 19 minutes of sustained operation resulted in the cars not providing the full expected amount of braking force. The performance of these 13 cars was shown to be representative of the other cars on the occurrence train. Finding as to causes and contributing factors Based on post-occurrence testing, it is likely that about 52 of the 112 cars on the occurrence train had reduced air brake effectiveness during the initial descent of Field Hill, and consequently an emergency brake application was necessary. During the tests performed outdoors in Banff, the leakage of compressed air from the brake cylinders was measured with the retainer set to operate in the high pressure (HP) position. Brake cylinder leakage was measured after releasing a full service / emergency brake application. At the end of the test (1 hour and 45 minutes), it was observed and recorded that 7 of the 13 recovered cars (54%) had leaked down to 0 psi.
TRANSPORTATION SAFETY BOARD OF CANADA 160 Finding as to causes and contributing factors For the occurrence train, given the extreme cold temperature and the length of time the cars were stationary with the brakes applied, the rate of BCP loss on some cars with retainers set was likely excessive. Finding as to risk When trains operate in extreme cold temperatures, brake cylinder leakage will occur, increasing the risk that the use of retaining valves as a means to preserve braking capacity will not be effective. 2.4.3.1.1 Brake cylinder leakage and applied air flow During tests on the 150-car test rack at Wabtec, a brake cylinder leakage of 1 psi/minute was applied to half the cars on the test rack, which resulted in an increase in air flow of about 2.1 CFM after a 10 psi brake pipe reduction. On the occurrence train, applied air flow values in the double digits were observed during the train’s initial descent to Partridge, indicating that there was excessive brake cylinder leakage on a large number of cars on the train, as well as leakage from other sources such as the brake pipe, and from older gaskets in the car control valves (CCV). According to the braking degradation curve,182 a BCP of about 40 psi (generated by a 15 psi brake pipe reduction) will start dropping and will reach the quick service limiting valve (QSLV)–maintained pressure of 10 psi after about 20 minutes when the brake cylinder is leaking at an initial rate of 1 psi/minute. This behaviour was observed during the tests performed on the 13 recovered grain cars during the outdoor testing in Banff. In these tests, 38% of the cars essentially lost their braking effort during service applications: BCP dropped from 38 psi to values between 0 and 10 psi in 19 to 20 minutes. Finding as to risk For a train negotiating a long descending grade, where a brake application may be held for over 20 minutes, even with a brake cylinder leakage rate within the maximum acceptable limit specified in AAR Standard S-486 SCT (1 psi/minute), there is a risk that brake cylinder leakage will render the air brake system ineffective. 2.4.3.2 Ineffective small reductions in brake pipe pressure In this occurrence, maintaining a maximum speed of 15 mph while descending the 2.2% mountain grade would have required the air brakes to be applied incrementally, to compensate for the continual loss of compressed air from the car brake cylinders. Results of tests performed on the recovered cars indicated that, for the occurrence train, after 20 minutes of sustained brake operation, the BCP was likely depleted to the point where an emergency brake application was necessary to prevent any further acceleration and bring the train to a stop.
182 A. Aronian and L. Vaughn, “NYAB Brake Cylinder Maintaining Trials Update,” Air Brake Association Conference, Minneapolis, Minnesota, United States, (October 2015).
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 161 The recovered cars were subjected to successive incremental brake applications (2 psi to 3 psi), over periods ranging from 7 to 20 minutes. Over 50% of the cars did not respond as expected and did not show much increase in BCP. This result highlights the importance of reducing brake pipe pressure by more than 2 to 3 psi when making successive air brake applications. Finding: Other Small incremental reductions in brake pipe pressure may not be sufficiently robust to propagate along the length of the brake pipe when there is a high-level air flow occurring simultaneously. They also can result in a pressure wave that cannot trigger the intended brake application response effectively on older or less sensitive CCVs. 2.4.3.2.1 Weak response of DB-10 service portions to small brake pipe reductions Various field and laboratory testing by CCV manufacturers and the AAR showed that NYAB’s DB-10 service portions made before 2005 did not respond as expected to small incremental brake pipe reductions following a minimum brake pipe pressure reduction. The brake applications resulted in almost no additional BCP build-up on some freight cars, and consequently the auxiliary reservoir pressure was depleted into the brake pipe through the weeper port, triggering an undesired brake release. Finding as to causes and contributing factors Twenty-seven cars on the occurrence train had DB-10 CCV service portions. It is likely that the response from these service portions to the small incremental brake applications that were made as the train was operating between Stephen and Partridge contributed to the difficulty in controlling train speed that led to the emergency brake application at Partridge. 2.4.3.3 Air leakage from the car control valves CCVs respond to decreases and increases in brake pipe pressure by applying and releasing/recharging the brakes of the cars they control. In extreme cold environments, the internal rubber gaskets and O-rings of the CCV can shrink, resulting in air leakage. The investigation determined that the rubber components on a number of CCVs on the train’s cars had pre-existing conditions, which contributed to the diminished effectiveness of the train’s braking system. According to NYAB General Letter GL-490, the NYAB-Knorr DB-10 service portion on CCVs manufactured more than 13 years ago are susceptible to leakage issues from the bottom exhaust port in extreme cold temperatures due to a worn rubber seal within the service portion. This condition is characterized by increased brake pipe air flow and auxiliary reservoir leakage when the brakes are applied. Such leakage might result in an undesired release of a car’s service brake application. Following an uncontrolled movement on CN’s Luscar Industrial Spur in 2018, additional NYAB testing identified problems with the DB-20 emergency portions. That testing determined that worn and deteriorated rubber seals resulted in excessive leakage from the CCVs during extreme cold temperatures. This leakage would result in the valves
TRANSPORTATION SAFETY BOARD OF CANADA 162 malfunctioning in response to service and emergency brake applications. These situations would only occur at extremely low operating temperatures. The occurrence train had 27 grain cars equipped with NYAB-Knorr’s DB-10 service portions and DB-20 emergency portions manufactured more than 13 years ago. Finding as to causes and contributing factors It is highly probable that the air brake system on the 27 grain cars equipped with NYAB- Knorr’s DB-10 service portions and DB-20 emergency portions manufactured more than 13 years ago could not maintain adequate braking effectiveness due to excessive leakage from worn and deteriorated rubber seals on these portions. Until 1992, the replacement of CCVs was time-based. At the time of the occurrence, the replacement of CCVs was based on the valve’s condition, as determined by a single car test (SCT). This practice presented serious safety risks for loaded unit trains descending mountain grades in extreme cold temperatures. Finding: Other The SCT, which is usually conducted in a shop or outdoor repair track environment at warmer temperatures, does not identify defective CCV conditions that manifest themselves in cold and extreme cold operating conditions. 2.5 The uncontrolled movement 2.5.1 Decision making after the emergency stop 2.5.1.1 Field Hill operating procedures Operating instructions for the Laggan Subdivision can be found in CP time tables, GOIs, general bulletin orders (GBOs), special instructions (SIs), operating bulletins, and train handling procedures. The instructions applicable to Field Hill are contained in the FHOP. 2.5.1.1.1 Incremental revisions to the procedures From their inception, the FHOP prompted the use of retainers as a first step in the recovery of the air brakes after an emergency stop on Field Hill. From 1998 until 2012, the FHOP required the use of retainers on at least 65% of the cars and, if operating conditions (e.g., abnormal braking conditions) dictated the use of hand brakes, then hand brakes were to be applied to 100% of the cars. The use of hand brakes was left to the discretion of the crew based on their assessment of the train’s performance, the weather, and rail conditions. The crew members could request guidance and technical advice from a road manager, but ultimately the decision to apply hand brakes in addition to setting retainers rested primarily with them. In 2012, modifications to the FHOP made a distinction between the first and second emergencies with respect to the percentage of retainers and hand brakes to be applied. • The percentage of retainers required after a first emergency increased from at least 65% of loaded cars to at least 75% of loaded cars, while the percentage of hand
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 163 brakes to be applied when abnormal conditions dictated dropped to at least 75% from 100%. • After the second emergency, the requirements were to apply retainers on 100% of the loaded cars (from at least 65% of the loaded cars), along with 40 hand brakes on the cars at the head-end of the train, rather than on every car. The changes made in 2012 made it clear in a note that “all westward trains experiencing an emergency brake application beyond mile 123.5 must communicate with the on duty Trainmaster via the RTC and be governed by their instructions,” whereas in 2008 this applied in the event of second emergency brake applications only. The 2012 FHOP also introduced a mandatory job briefing between the train crew and the trainmaster after the first emergency brake application. The job briefing is an important opportunity for crews and the trainmaster to share information on train performance, environmental factors, and any risks associated with train handling. Together the job briefing and the guidance in the FHOP were the resources in effect at the time of the accident to support the development of a course of action following an emergency brake application on Field Hill. 2.5.1.1.2 Company procedural guidelines as opposed to prescriptive procedures In the FHOP in effect at the time of the occurrence, the procedures for recovering from an emergency brake application on Field Hill were guidelines rather than a prescriptive emergency procedure. Tasks were discretionary, not mandatory, compelling operators to make decisions based on their combined experience and their understanding of the situation. The assumptions underlying the FHOP were that there was • effective communication to achieve consensus between train crew and trainmaster on the condition of the train and its forecasted state; • agreement between crew members; • consideration of abnormal conditions such as weather or a poor-braking train and understanding of their impact; • technical expertise from every participant in the job briefing; and • operational knowledge, experience and qualifications for operating on the territory. Because the FHOP were procedural guidelines rather than a prescriptive emergency procedure, they did not contain mandatory instructions driven by environmental or mechanical conditions. A guidelines approach carries a risk that operators closest to the emergency will misjudge the severity of the situation. In this occurrence, the train had a potential loss of control event when the inbound crew was unable to control its speed, which led to the emergency stop at Partridge. At that time, the ambient temperature was in the range of temperatures known to cause abnormal air brake function—and it was getting colder. The FHOP said that “abnormal conditions” might dictate a course of action; however, they did not contain thresholds of abnormal conditions at which crew members would be required to take specific actions.
TRANSPORTATION SAFETY BOARD OF CANADA 164 Finding as to causes and contributing factors Even though the inbound crew experienced poor train braking performance that had required an emergency stop, the Field Hill operating procedures did not lead the crew and the trainmaster to conclude that the situation warranted applying hand brakes in addition to setting retainers. To the extent that the FHOP were meant to guide employees’ actions following emergency stops, they were very different from emergency management tools used in other transportation industries. For example, quick reference checklists in commercial aviation are designed to direct users to take specific actions during emergencies. They are in an easy-to-read format and are inherently clear and unambiguous in listing abnormal equipment behaviour and providing instructions on the actions to take in response. A checklist for an emergency stop on Field Hill might include specific conditions under which it is mandatory to apply hand brakes: for instance, a specific cold ambient temperature, the presence of applied air flow events, or the maximum length of time a train is permitted to be stationary. Overall, such checklists are designed using a human-centred approach, which assumes that the crews using them have varied experience and are working in conditions of heightened stress; this approach reduces the opportunity for error. Finding as to risk If guidance on how to respond to an emergency situation is not explicit but instead relies on employees’ interpretation of the situation, employees’ decision making may not be precisely informed, increasing the risk of an unsafe course of action being implemented. 2.5.1.2 Job briefing After the train stopped in emergency on Field Hill, a job briefing was required to take place per the FHOP. During this briefing, the trainmaster, with input and feedback from the inbound crew, would decide on the best course of action to recover from the emergency brake application. 2.5.1.2.1 Available methods for recovering from the emergency brake application As a precondition for brake recovery after an emergency stop, the first prompted method outlined in the FHOP is to set retainers on at least 75% of the loaded cars before referring to the use of hand brakes. The FHOP indicate that, when considering whether to apply hand brakes after a first emergency brake application on Field Hill, the operators should base their decision on the situation (for instance train location on the hill, weather, or other conditions present that may affect the braking of the train). Should a second emergency brake application be necessary, the FHOP require retainers to be applied on 100% of the loaded cars, as well as 40 hand brakes at the head end of the train. Leaving operators to choose between applying only retainers or using hand brakes after a first emergency is problematic, because these methods require different levels of effort,
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 165 have different purposes, and vary in effectiveness, particularly in extreme environmental conditions. Setting retainers is relatively manageable by a lone conductor. Retainers, by design, use the car air brake system to entrap residual air pressure in the brake cylinder after the brakes are released and during recharge. The success of retainer use as a temporary means to help limit train acceleration during brake system release and recharge depends on components that may have already contributed to the deterioration of braking and that may already be compromised; therefore, the expected BCP and braking force may not be available. Applying hand brakes, in contrast, requires significantly more time and energy to be done correctly. In winter months, this action is further complicated by bulky winter clothing restricting mobility and the difficulty of moving through snow alongside the train. Because of the time required, applying a large number of hand brakes can interrupt rail traffic for hours and can have profound repercussions on rail operations across the network. Because of its wide-ranging implications, both for conductor workload and for railway operations, a decision to apply hand brakes is extremely difficult to make and substantiate in the absence of clear and objective decision criteria that are based on assessment of the hazard. In this occurrence, the crew members and the trainmaster were aware that the tail end of the train was blocking the east siding switch at Partridge, preventing the operation of other trains in either direction. 2.5.1.2.2 Trainmaster’s assessment of the situation Safety is created when operators successfully apply their knowledge to achieve operational goals within resource-constrained situations. The concept of bounded rationality in complex industries implies that resources, including the operator’s knowledge, are invariably limited. As a result, the course of action developed on the basis of these resources may be incomplete or erroneous, especially when there are multiple goals to achieve with a limited set of resources to apply. The trainmaster's assessment of the emergency stop was based on his experience with grain trains and the handling of over a dozen emergency stops where retainers were used routinely. Finding as to causes and contributing factors After the job briefing, during which critical factors, such as ambient temperature, brake system performance and the significance of the applied air flow events that might have prompted the application of hand brakes, the trainmaster decided that setting retainers was sufficient after this first emergency stop. 2.5.1.2.3 Trainmaster as technical lead in decision making With regard to selecting a course of action to recover from an emergency brake application on Field Hill, decision authority of the trainmaster is built into the FHOP which states, in part, “All westward trains experiencing an emergency brake application beyond mile 123.5 must communicate with the on-duty trainmaster via the RTC and be governed by their
TRANSPORTATION SAFETY BOARD OF CANADA 166 instructions.”183 As written, overall authority is assigned to the trainmaster, given the supervisory role, perceived higher level of experience within the group and company, and assumed deeper knowledge of emergency stops on Field Hill. The decision-making process is informed by job briefings with train crews and is designed to build a shared understanding of the work to be done and the measures to be taken to ensure operational safety. In practice, crew members communicate critical information pertaining to safe train operations, which may include a discussion of potential hazards and the means to protect against them. For crew interactions to be effective in developing a course of action, participants ought to feel able to provide input such as technical expertise and experience while being receptive to input from other crew members who typically consist of people with different personalities, levels of experience, and seniority. In this occurrence, the trainmaster’s decision to apply only retainers was not questioned. The conductor did not have enough experience to offer an opinion, whereas the inbound LE had experience and knowledge of train performance in a variety of operating circumstances. He had operated the train from Alyth to Partridge and had experienced an unanticipated and inadequate response from a series of service brake applications on Field Hill, which led him to having to make an emergency brake application. The outcome of the job briefing was in accordance with the FHOP, where the inbound train crew abided by the trainmaster’s interpretation of the situation in applying retainers. The role of trainmaster as a decision-making authority in the FHOP is a critical leadership role, supported by job briefings where the exchange of technical information among the crew is vital. Trainmasters are normally contacted remotely and are therefore a narrowly embedded member of the team. Circumstances surrounding decisions may be worsened if the trainmaster does not have the requisite technical expertise and mountain grade experience to draw from when identifying risk in a complex operational situation. In this occurrence, the trainmaster’s effectiveness as technical leader in decision making was likely weakened given the mismatch between his experience, the lack of resources such as decision trees or other decision-making aids, and the requirements of supervising mountain grade operations on the Laggan Subdivision. As a consequence, opportunities for engaging the inbound crew’s technical proficiency and situational awareness were likely reduced. The decision-making structure in the FHOP represents a potential weakness if the trainmaster is inadequately prepared for the role as technical leader. Although the possibility of creating a troubleshooting document for trainmasters was discussed in the Calgary Cross-Functional Health and Safety Committee (CCFHSC) meetings, as indicated in the CCFHSC meeting minutes for August 2018, such a document was never developed. Finding as to causes and contributing factors The trainmaster was not Field Hill–certified and had not previously experienced an emergency stop on Field Hill. As a result, his decision making likely relied on the direction
183 Canadian Pacific, Laggan Subdivision (Incl Copithorne Spur) Train Handling Procedures (13 October 2015), Section 1.0.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 167 outlined in the FHOP, which was commonly interpreted to mean that only retainers were to be applied after a first emergency stop on Field Hill. 2.5.2 Loss of retarding force while stopped on Field Hill Table 27 shows the time and location for key events on Field Hill. As shown, the train had remained stationary with the brakes applied in emergency for about 2 hours and 52 minutes when the train started to roll on its own. At this point, a total of about 3 hours and 14 minutes had elapsed since the initial 7 psi brake pipe reduction had been made as the head end of the train started to descend Field Hill. During this entire period, brake cylinder leakage was occurring in varying amounts on the cars. Table 27. Total elapsed time from first brake application to start of uncontrolled movement Time Location Mile Event Time between events 2128:13 Stephen 123.12 Initial brake application 00:00:00 2149:33 Partridge 127.46 Emergency stop 00:21:20 0042:02 Partridge 127.46 Train movement starts 02:52:29 Total elapsed time 03:13:49 Theoretical brake force calculations indicate that, given the weight of the train, the grade, the train speed, and the distance required for the train to come to a stop after the emergency brake application, an average BCP of about 47 psi would have been needed to develop the required brake force to stop the train. Once the train was stopped, the retarding force required to hold the train stationary on the 2.2% grade would have been provided in small part by the locomotives’ independent brakes, but mainly it would have needed to be provided by the cars’ braking system. Each car, on average, would have needed to provide at least 31 psi of BCP. As long as the BCP remained above this average, the train would be expected to remain stationary. Finding as to causes and contributing factors Three hours and 14 minutes after the initial brake application at Stephen, the average BCP likely decreased to below 31 psi. This rendered the retarding force insufficient to prevent the train from starting to roll uncontrolled down the mountain grade. Tests conducted on a 150-car test rack at Wabtec determined the BCP degradation for various induced leakage rates. The results of these tests showed that, for a leakage rate of 0.5 psi per minute, the drop in BCP from 47 psi to 31 psi would take 1 hour and 50 minutes. Because it took 2 hours and 52 minutes for the average BCP in the occurrence train to decrease from 47 psi to below 31 psi, the brake cylinder average leakage rate would have been less than 0.5 psi per minute on the cars that had operational brakes. This leakage rate is within the maximum acceptable limit for the SCT brake cylinder leakage test specified in AAR Standard S-486 (1 psi/minute). However, the train was stationary on the mountain grade for too long to maintain an average BCP above the minimum 31 psi required to keep the train stationary.
TRANSPORTATION SAFETY BOARD OF CANADA 168 2.5.3 Brake shoe friction fade Trains operating in mountain territory can be subject to brake shoe friction fade. This can occur when the brakes remain applied for an extended period while the train is in motion. Brake shoe friction fade, also known as friction fade, occurs when wheel tread surface temperatures reach the point where the coefficient of friction between the high-friction composition brake shoes and the wheel treads drops off rapidly, usually when the brake horsepower (BHP) exceeds 30. The amount of heat generated is proportional to BHP, which itself is proportional to speed and brake retarding force. TSB calculations show that from Stephen, where the initial brake pipe reduction was made, until the emergency stop at Partridge, the BHP remained well below the friction fade threshold. However, during the uncontrolled movement, the train accelerated to 53 mph. On those cars with effective brakes, the conditions necessary for friction fade would have existed: at this speed, the BHP would have exceeded 30 and could have reached as high as 67. This range of high BHP would have occurred only during the final 4 minutes of the total 8.5 minutes that the uncontrolled movement continued to gain speed on the descending mountain grade before derailing. This is a relatively short duration compared to most occurrences involving friction fade, a condition that usually develops more gradually due to a slower buildup of speed and brake force. However, any cars on the occurrence train that retained a BCP of at least 50 psi with the brakes applied in emergency would have had high brake shoe forces. On these cars, BHP would have exceeded 30 at a speed of about 12.5 mph. The tests conducted outdoors in Banff on the 13 recovered cars revealed that 9 of the cars (69% of the total cars) had a BCP of 50 psi or greater with the brakes continuously applied in emergency for 3 hours. These cars would have had a high BHP, and would have experienced friction fade during the uncontrolled movement. The cars would have similarly experienced friction fade and would have developed some degree of blue discoloration of the wheel tread surface. Examination of the recovered wheelsets did reveal that 59% of the wheel tread surfaces throughout the train showed indications of blueing, which is synonymous with friction fade, with almost 10% of the wheel surfaces exhibiting severe (heavy and very heavy) blueing. Finding as to causes and contributing factors Brake shoe friction fade occurred on the cars with effective brakes, contributing to the high speed during the uncontrolled movement. 2.5.4 Proportion of cars with ineffective braking A BCP that is less than expected, or that decreases over time due to leakage effects, is symptomatic of degraded braking effectiveness. Therefore, the percentage of the train’s cars with ineffective brakes can be obtained by comparing the theoretical BCP and the effective pressure obtained during braking (service and emergency).
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 169 The retarding forces were calculated for the loaded grain train, based on its weight of approximately 15 000 tons and taking into account that 110 of the 112 cars had functioning brakes, and that the train was travelling on a 2.2% average descending grade. The calculations show the following: • To maintain a train speed of 15 mph on the descending grade, the train would need 25 psi average BCP on each car, in combination with the mid-range locomotive DB. A 10 psi brake pipe pressure reduction should have produced a BCP of this magnitude, and a 19 psi brake pipe pressure reduction would have been expected to produce 40 psi of BCP. However, while the train was descending Field Hill, the application of incremental brake pipe pressure reductions totalling 19 psi did not produce the minimum 25 psi BCP required to maintain speed, and the train continued to accelerate. • The retarding force required to bring the train to a stop from a speed of 23 mph in a distance of 1815 feet on the descending grade could be obtained with an average BCP of 47 psi. If the train had a fully effective braking system, an emergency brake application would have produced an average of 77 psi BCP. Therefore, each car on the train, on average, yielded only about 61% brake effort. • The retarding force required to hold the train stationary after the emergency brake application on the descending grade could be obtained with an average BCP of 31 psi (40% of the theoretical maximum). Finding: Other Based on braking calculations, cars on the train yielded, on average, about 61% brake effort in response to the emergency brake application at Partridge. About 3 hours later, when the train began to roll on its own, the brake effort had degraded to less than 40% of theoretical maximum brake effort. 2.5.4.1 Proportion of cars with cold wheels Wheel temperatures for all 112 cars were obtained from their previous loaded trip west to Vancouver, some 2 weeks before the occurrence. According to the wheel temperature detector (WTD) readings, roughly 18% of the cars were cold and approximately 60% of the cars in the train had effective brakes. However, these measurements were taken when the local ambient temperature ranged from −0.5 °C to −4.0 °C; it was much colder (−25.0 °C) when the occurrence train went into emergency. Outside temperature plays a significant role in the efficiency of the braking system, and hence in the WTD wheel temperature results. Therefore, although the previous wheel temperature data collected by the WTDs revealed that 18% of the cars were “cold,” the data would not be expected to reflect, and likely overestimated, the braking performance of the occurrence train on the night it descended the mountain grade between Stephen and Partridge. The performance of the braking system is likely better represented by the readings of 2 similar westbound unit grain trains that passed by the WTDs when the ambient temperature was similar to the temperature on the day of the occurrence. When these trains passed by the WTD located at Mile 130 on the Laggan Subdivision the day before the
TRANSPORTATION SAFETY BOARD OF CANADA 170 occurrence, when the ambient temperature was −25.6 °C, the percentage of cold cars registered was 55% and 56%. In extreme cold temperatures, some of the cars on the occurrence train that showed prior average wheel temperatures in the marginal range (between 100 °F and 150 °F inclusive) would have experienced further brake cylinder leakage, rendering their brakes ineffective; thus, the percentage of cars on the train with cold wheels on the day of the occurrence would have been much higher than the 18% recorded by the WTD on a previous trip. Considering that the difference in temperature would have affected the occurrence train the same way it affected similar westbound unit grain trains, then the percentage of cold or ineffective braking cars on the occurrence train would have been similar (about 56%) at a similar outside temperature: i.e., −25.6 °C. Finding: Other Based on the comparison of WTD data for similar unit grain trains operating in extreme cold temperatures, i.e., below −25 °C, calculations indicate that the occurrence train was operating with at least 50% cold cars, as defined by the railway’s WTD criteria, at the time of the occurrence. 2.5.4.2 Proportion of wheels with tread blueing The wheels recovered from the occurrence site were examined for tread blueing. Blueing of tread surfaces on rolling stock wheels, which is caused by the frictional heat generated during a heavy or extended brake application, can be used as a qualitative measurement of the relative braking force applied to each wheel. Of the wheels examined, about 52% showed blueing categorized as Level 0 (no blueing) and Level 1 (very light blueing), indicating that they had not been subject to high frictional heat from the brake shoes pressed against the wheel tread. This in turn would indicate that the brakes on these cars were inoperative and marginally operative respectively. The percentage of wheels with blueing at a Level 0 and Level 1 (totaling 52%) is comparable to the percentage of cold cars (totalling 56%) observed on the westbound grain trains that operated the day before the occurrence, when it was −25.6 °C. 2.6 Effectiveness of required air brake tests to identify cars with defective brakes The negative effects of extreme low ambient temperatures on brake performance and brake force efficiency are well documented. However, it is very difficult to diagnose deficient air brake performance with the required air brake tests for trains or through periodic SCTs performed when the freight cars are inspected and tested inside the environment of a heated shop. The train underwent and passed a No. 1 brake test before departing Alyth Yard. The test, performed by certified car inspectors on a stationary train, verifies that the air brake system is fully charged and that the air brakes apply and release in response to decreases and increases in brake pipe pressure. The test also involves inspecting the air brake system on
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 171 the train to verify that hoses are coupled, angle cocks are properly positioned, and brake rigging is intact and operational. In addition to visually verifying that the brake cylinder pistons on each car have extended and retracted in response to the air brake application and release, inspectors also look for any apparent safety defects that might compromise the safe operation of each car. Although the No. 1 brake test can verify air brake system responsiveness by confirming that the brakes apply and release, it cannot determine the air brake system’s effectiveness. Moreover, unlike automated train brake effectiveness (ATBE) testing, the No. 1 brake test assesses brake functionality on stationary trains but does not expose brake system defects that occur only while the train is in motion, such as intermittent leakage in hoses and piping and vibration-triggered CCV malfunctions.184 Finding as to causes and contributing factors Both the WTD measurements and the safety hazard reports filed by train crews of westbound loaded unit grain trains confirm that the No. 1 brake tests performed in Alyth Yard did not adequately identify cars whose brakes would not be fully effective in the extreme cold temperature experienced by the occurrence train while descending Field Hill. In times of extreme cold in the mountains, the temperature difference that can exist between Calgary and Stephen undoubtedly plays a significant role in the braking degradation experienced by these trains when they reach Field Hill. The comparative study between No. 1 brake test data and ATBE data showed that the No. 1 brake test identifies only a very small fraction of the defective cars that WTDs could detect. The high number of cold wheels detected by the WTDs implies that a high number of grain trains having ineffective brakes are not captured by the No. 1 brake tests and inspections conducted by certified car inspectors at Alyth Yard. Finding as to risk Until train brake test methodologies accurately evaluate air brake effectiveness, trains operating in extreme cold temperatures may continue to have ineffective braking, increasing the risk of loss of control and derailment. WTD data facilitates the identification of cars with marginal or poor braking performance that may manifest only while trains are in motion. The data are collected year-round and provide flexibility in proactively planning repairs on cars flagged with cold wheels. Also, the WTD data collected in winter allow railways to monitor the temperature sensitivity and performance of the car air brakes when they are most susceptible to leakage.
184 Petition for a Waiver from 49 C.F.R. § 232.213; 232.75 and 232.103(f) for Extended Haul Trains, Movement of Defective Equipment and General Requirements for All Train Brake Systems, prepared by Transportation Technology Center, Inc., and submitted by the Association of American Railroads (February 2016), Appendix 3: “Safety Assurance plan for using Wheel Temperature Detector Data as an Alternative to the Intermediate Brake Test”.
TRANSPORTATION SAFETY BOARD OF CANADA 172 Finding: Other WTD data collected in winter for trains operating in temperatures of –25 °C or less provide valuable insight into overall train braking health. These WTD data could be used to establish winter operating criteria for the safe operation of unit grain trains in extreme cold temperatures. The outdoor testing at Banff of the 13 recovered cars was performed in ambient temperatures that were as close as possible to the outdoor temperatures at the time of the occurrence. As part of this testing, a No. 1A brake test using the air flow method was successfully completed and served to verify that the cars, with one exception, were compliant with mandated air brake requirements. All 13 cars subsequently failed an SCT conducted in the same outdoor cold-temperatures. When the 13 cars underwent another SCT months later at a car shop in warmer temperatures, 6 of the cars (45%) failed the test. By cross-referencing WTD data (collected before the occurrence) for the 6 cars that failed the car shop SCT, it was determined that 2 of the cars had registered cold wheels and thus had a completely ineffective braking response. The other 4 cars did not register cold wheels. The test results from the outdoor testing at Banff clearly show that standardized air brake tests, such as the No. 1, No. 1A, and brake pipe leakage tests, do not reliably identify cars with ineffective brakes in extreme cold temperatures. 2.7 Developments in brake technology for freight trains 2.7.1 Automatic parking brakes Conventional hand brakes must be applied manually on individual cars on a train. This task is time-consuming and labour-intensive. Automatic parking brakes, by comparison, are applied and released automatically on all cars at once based on a train’s brake pipe pressure, and therefore can secure a train in a very short time without manual intervention by train crews. On a train equipped with automatic parking brake technology, as soon as the brakes are applied in emergency, depleting the brake pipe pressure, the automatic parking brakes engage, which fully secures the train on the mountain grade indefinitely, regardless of BCP loss due to leakage. The automatic parking brake eliminates the need to set hand brakes on a train. However, once ready to get the train moving again, an LE would still need to perform a release and catch operation, and therefore it would still be necessary to apply retainers (or the pneumatic control module, if the automatic parking brake was equipped with this feature) on some of the cars. Automatic parking brakes can be configured for use on both truck-mounted and body- mounted brake cylinders, and they can be retrofitted on existing freight cars with no need for modifications to the air brake system.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 173 2.7.2 Brake cylinder maintaining feature All AAR-approved CCVs have a QSLV pressure maintaining feature that ensures that the pressure in the brake cylinder remains between 8 and 12 psi even when brake cylinder leakage exists. In addition to the QSLV pressure maintaining feature, all AAR-approved CCVs designed after 2014 incorporate a brake cylinder maintaining (BCM) feature, which compensates for air leakage not only during minimum brake applications, but also during full-service brake applications. On trains equipped with these modern CCVs, it is no longer necessary to make progressive stepped brake applications to re-establish the targeted BCP levels even when there is leakage. BCM is used successfully to improve train brake performance and increase operational safety and efficiency. However, BCM can mask BCP leakage in the field, and is not active during an emergency application when brake pipe pressure has been fully exhausted. 2.7.3 Retention of dynamic brake force on remote locomotives DB holding is a feature that allows the DB on a locomotive to continue working in the event of an emergency brake application. The DB holding feature is required for all territories on which locomotives with DB are dispatched. This requirement is currently considered to have been met when DB holding is available on the head-end locomotive consist. On older DP systems, such as the one used on the occurrence train, DB holding is not available on remotely controlled locomotives that are linked to the lead locomotive via DP radio communication. Consequently, when the train went into emergency on Field Hill, DB was disabled on the 2 DP remote locomotives. This amounted to a loss of 98 000 pounds of DB retarding force per locomotive, or about 196 000 pounds in total. Although locomotive DB is considered a supplemental brake system, DB retarding force provides an important additional margin of safety. For example, a single AC locomotive operating with the maximum available DB can provide effective braking force at speeds below 20 mph that is equivalent to about 4 cars having a full service brake application. GE-Wabtec, the manufacturer of the DP control system, has recently developed a new software enhancement to enable full DB functionality to be retained on an operative DP remote locomotive during an emergency brake application, similar to the DB holding feature that is currently required on lead locomotives. Some North American Class 1 railways have implemented DB retention on remote locomotives as part of their normal DP operations enhancements. At the time of this occurrence, the 2 remote locomotives on the occurrence train were not equipped with the DB retention feature. Because the emergency brake application was not recovered, the pneumatic control switch remained open and DB functionality remained disabled on the DP remote locomotives. Had the 2 DP remote locomotives on the occurrence train been equipped with DB retention, they could have continued to provide a combined maximum of 196 000 pounds of retarding force. This is significantly more retarding force than the combined 50 000 pounds of retarding force that resulted from the 45 psi independent BCP on each of the 2 remote
TRANSPORTATION SAFETY BOARD OF CANADA 174 locomotives after the emergency brake application was made by the crew. Retarding force generated by DB is not subject to degradation due to brake shoe friction fade. The additional retarding force due to retaining maximum available DB on the 2 remote locomotives would have helped to slow the acceleration of the train to some extent, and helped increase the chances of the train successfully negotiating the sharp curve just before the Kicking Horse River bridge. However, it is not certain whether the train would have derailed nonetheless given all the train dynamics and variables involved. 2.7.4 Electronically controlled pneumatic brake systems Electronically controlled pneumatic (ECP) brake systems offer several advantages over the standard pneumatic brake technology exclusively being used on freight trains in North America. Had the occurrence train been equipped with an ECP system, several of the braking issues that contributed to the uncontrolled movement could have been prevented or mitigated. The occurrence train did not have a means of indicating on the operator display screen which cars were leaking. ECP systems have a remote monitoring feature that would have provided this information to the LE. The investigation determined that, when the inbound LE on the occurrence train made the emergency brake application, over 30% of the cars would have had ineffective brakes. An ECP system would have automatically triggered a penalty brake application when 15% of the cars were detected to have ineffective brakes. When the inbound LE stopped the train in emergency on Field Hill, the brake pipe pressure was reduced to 0 psi and the air storage reservoirs on the cars immediately stopped being charged. While the train remained stationary, BCP on many of the cars was depleted due to leakage effects until eventually there was not enough brake force to hold the train. An ECP system could have constantly charged the brake pipe to 90 psi and, in turn, the car reservoirs would have continuously charged and replenished the brake cylinders. This could have resulted in the brake cylinders being continuously maintained to the maximum target pressure when an air brake application was made. Without ECP, cars can only be cut out when their brakes are found ineffective during a wayside inspection. In comparison, ECP systems have an automatic car cut-out feature that cuts out the cars with excessive brake cylinder leakage en route as soon as it detects the leakage. On the occurrence train, some of the small (2 psi) brake pipe reductions were being attenuated as the air pressure wave propagated through each car and along the brake pipe. As a result, the intended air brake application commands were not reaching some of the cars, and those cars were not developing the higher BCPs that would have been expected from the brake pipe reductions. With an ECP system, the brake commands would have been sent to each car simultaneously via electronic signals, ensuring that small brake application commands could be fully received and executed. On standard pneumatic brake systems, which were used on the occurrence train, brake effort can be increased by further reducing the brake pipe pressure, but the brakes cannot
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 175 be incrementally released; they must be completely released, then reapplied in a partially charged state (known as a release and catch). An ECP system, in contrast, has a feature that allows the brakes to be released incrementally. When train speed suddenly increases, the system can send out higher brake effort signals, then gradually release or reduce the brakes as the train speed stabilizes to comply with allowable track speed limits, thus removing the need for a release and catch. In addition, using this feature after an emergency brake application enables a train to be restarted directly from the locomotive cab, without the need to set any retainers, by releasing just enough brake pressure to get the train moving again at a safe speed. ECP systems were nearly made mandatory by the U.S. Federal Railroad Administration in
- These systems would have been required on all unit trains carrying dangerous goods
in the U.S. However, this initiative was dropped in 2018 due to high initial implementation costs and logistics issues regarding the interoperability of trains that have ECP systems with trains that have pneumatic conventional brakes. However, loss of control events are still occurring, sometimes with fatal consequences. In addition to this occurrence, 5 other significant runaway train events have occurred in North America from 2017 to 2019. 2.7.5 High-capacity fade-resistant brake shoes The train’s speed when it derailed at the Kicking Horse River bridge was 53 mph. Trains equipped with high-capacity fade-resistant brake shoes experience lower effects of friction fade. Calculations based on LER data indicate that, in the absence of friction fade, the train’s speed at the Kicking Horse River bridge would have been 44.4 mph, a speed at which other uncontrolled train movements on Field Hill have successfully negotiated similar curves. The Board has previously investigated an uncontrolled movement in which a reduction in brake effectiveness due to brake shoe friction fade contributed to the accident (TSB Railway Investigation Report R06V0136). In that investigation, it was noted that an AAR Standard for fade-resistant brake shoes had been established and fade-resistant brake shoes had been developed, but their use had not been made mandatory. Therefore, the Board was concerned that heavier cars would continue to be operated with the older specification brake shoes. As of December 2021, the AAR has not adopted a framework providing for the mandatory use of high-capacity brake shoes for equipment in interchange service. Finding as to risk Until the use of fade-resistant brake shoes is made mandatory on unit trains operating through mountain grade territory, there is an increased risk that these trains will experience brake shoe friction fade and loss of control while descending long mountain grades.
TRANSPORTATION SAFETY BOARD OF CANADA 176 2.7.6 Need for additional physical defences As a result of the TSB investigation into the Lac-Mégantic accident in July 2013,185 which directly caused the death of 47 people and destroyed the town’s core and main business area, the Board recommended that the Department of Transport require Canadian railways to put in place additional physical defences to prevent runaway equipment. TSB Recommendation R14-04 This recommendation specifically focuses on the insufficient securement of rolling stock. In response, Transport Canada (TC) has implemented several initiatives, including reinforced CROR Rule 112 securement requirements and the introduction of a comprehensive monitoring plan for this new rule. In its March 2021 assessment of TC’s response, the TSB stated that, despite actions taken, the current defences have not been sufficient to significantly reduce the number of uncontrolled movements to improve safety. Until the consultations with the railway industry and its labour representatives have occurred, strategies have been developed and physical defences are implemented, uncontrolled movements will continue to pose a risk to the rail transportation system. The Board assessed TC’s response to Recommendation R14-04 as being Satisfactory in Part.186 Sound safety management requires the identification of hazards, the assessment of the associated risks and the development of risk mitigation strategies. Risks that cannot be eliminated must be managed. To manage risks, defence barriers can be used. These barriers can generally be categorized as administrative, physical, or a combination of the two. Administrative defences, e.g., rules or procedures, are generally not as effective as physical defences, e.g., a switch lock, a mechanical device or a built-in safety feature. Since Recommendation R14-04 was issued, CROR Rule 112 (Securing Unattended Equipment) has been revised several times, a number of Ministerial Orders have been issued pertaining to train securement, and a new rule, CROR Rule 66 (Securing Equipment After an Emergency Brake Application on Grade), has been issued. All of these actions represent additional or enhanced administrative defences. None of them introduce any new physical defences. The technological enhancements detailed above are examples of physical defences that are likely to have a positive effect on the frequency of unplanned and uncontrolled movements of railway rolling stock. There may be other physical defences under development that could lead to even greater safety. Finding as to risk Until additional physical defences are put in place, there is an ongoing risk that unplanned and uncontrolled movements of railway rolling stock will continue to occur, resulting in
185 TSB Railway Investigation Report R13D0054. 186 TSB Recommendation R14-04: Physical defences to prevent runaway equipment, at https://www.bst- tsb.gc.ca/eng/recommandations-recommendations/rail/2014/rec-r1404.html (last accessed 21 May 2021).
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 177 derailments, collisions and unacceptable risk to railway employees, the public and the environment. 2.8 Canadian Pacific 2.8.1 Coaching assessments and proficiency testing CP conducts coaching assessments (pre-qualification evaluations and field placement trips) on trainees and proficiency tests (efficiency tests and ride-along trips) on qualified crew members to ensure that LEs and conductors have the required skills and qualifications to perform safety-critical duties. Both the inbound LE and the inbound conductor received pre-qualification evaluations as part of their training. • For the LE, who received his training in 2012, all tests were conducted on the Laggan Subdivision and focused on tasks relevant to the territory, which were well documented in the evaluation form. Test results always included constructive comments. • For the conductor, who received her training in 2018, only 9% of pre-qualification evaluations were conducted on the Laggan Subdivision, making it difficult to determine how proficient she was on that territory. In addition, only 42% of the evaluations provided feedback to indicate which operational tasks she performed well during the tests, and in which areas she needed to improve. Once they were qualified for their respective positions, both inbound crew members received ride-along trips every year as part of CP’s proficiency testing. However, the results of these trips were not available. Without some documented measurement of ability, it is not possible to determine if train crews are safely performing the operational tasks required of their position. CP’s supervisors are required to conduct a given number of efficiency tests per week and per month; however, there are no minimum requirements regarding the number of tests that each employee is to receive each year. Consequently, some train crews can receive fewer tests than others. In addition, the investigation found inconsistencies in how pre-qualification and proficiency tests are carried out: • The pre-qualification evaluations for the inbound LE all had constructive comments, but most pre-qualification evaluations for the inbound conductor did not. • There is a significant downward trend in the number of efficiency tests performed: in 2018, the number of tests conducted for the LE of the inbound crew was 50% less than in the 5 prior years. • CP’s SMS internal audit, carried out by Golder and Associates, identified inconsistencies in how proficiency tests were performed; according to the consultant’s report, concerns were expressed regarding the competency of the CP managers/trainmasters who were conducting these tests.
TRANSPORTATION SAFETY BOARD OF CANADA 178 Finding as to risk Without a sufficient proficiency tests on all train crews, and without test results that consistently provide qualitative feedback, there is a risk that deficiencies in an employee’s skills, qualifications, or knowledge will not be adequately identified and that corrective actions will not be taken to improve safety. 2.8.2 Railway winter operating plan Brake system leakage in extreme cold temperatures can be particularly problematic in mountain grade territories, where safe train speed control on long descending grades requires higher levels of BCP for an extended length of time. Similarly, trains stopped on mountain grades with the air brake applied for an extended period may be prone to brake cylinder leakage, which can lead to uncontrolled movements, as in this occurrence. The investigation determined that there had been ad hoc winter restrictions for Field Hill in the past, implemented by local supervisors. For instance, in 2014, the speed of the grain trains was limited to 10 mph when it was −20 °C or colder, and, if the temperature fell below −25 °C, grain trains were staged at night. In 2015, an operating bulletin was issued for westbound trains on the Laggan Subdivision, which restricted train speed to a maximum of 10 mph from the east siding switch at Partridge to Field when the temperature reading at the hot box detector at Mile 111.0 dropped below −25 °C, until braking was seen to be sufficient. However, at the time of this occurrence, neither CP’s winter operating plan nor the FHOP contained specific direction to safely operate trains in mountain grade territories at times when extreme cold temperatures prevailed. Because the challenges of operating in extreme cold temperatures arise only intermittently, it is likely that the need to activate these measures was overlooked each year: when the problem went away, there was no longer a need for a solution. Finding as to causes and contributing factors From 2015 to the time of the occurrence, CP had not imposed restrictions on the operation of unit grain trains on Field Hill in extreme cold temperatures. Given the effects of extreme cold temperatures on rail car air brake systems, when temperatures drop below −25 °C, curtailing operations may be the safest solution, for instance: • cease operations when temperatures reach a pre-determined threshold, or move to daylight-only operations; • implement enhanced testing protocols for the equipment, for example add a delay between the train brake application and the inspection of the equipment to ensure brake applications are sustained; and • leverage technologies like ATBE to monitor on a real-time basis the number and recurrence of cold cars, and take appropriate actions based on the data to ensure safety.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 179 Finding as to risk If appropriate seasonal operational restrictions are not consistently activated every year to ensure the safety of unit train operations during extreme cold temperatures in mountain grade territory, there is an increased risk of loss of control and derailments. 2.8.2.1 Relief crew fitness for duty Being “fit for duty” means reporting for work rested and prepared to maintain alertness for the duration of the tour of duty. From the human performance perspective, field accommodations provided to crews operating away from home are meant to preserve and promote rest before a tour of duty. Being rested and prepared is an important element of resiliency,187 which is defined as the process of adapting effectively during adversity, trauma, threats, or significant sources of stress. The relief crew had more than 8 continuous hours off-duty time, per established rest and fitness requirements. However, a power outage caused by a winter storm affected heating and electrical power at CP’s bunkhouse where the relief crew was resting. Temperatures inside the bunkhouse facility had reportedly dropped to 8 °C. The propane gas–fuelled cooking stove was being used to generate heat to prevent the temperatures from dropping further. The bunkhouse power outage, which resulted in a loss of heating, may have affected relief crew rest and fitness for duty. Additionally, the power outage and communications failure contributed to logistics challenges for continued railway operations: e.g., crews could no longer be called for duty by telephone, nor receive GBOs at the bunkhouse. Although the winter storm was beyond the control of the railway, contingency planning could have helped prepare for such events. For instance, the generator in Field had run out of fuel; reliable backup power and heat sources would have helped ensure that a comfortable environment conducive to acquiring restorative rest could be maintained at all times. Finding as to risk When designated rest facility conditions are not conducive to employees obtaining restorative rest, there is an increased risk that employees will be not be fully rested at the end of a designated rest period. 2.8.3 Safety management system A safety management system (SMS) is an internationally recognized framework which allows companies to effectively manage risk and make operations safer. The TSB Watchlist emphasizes the need for SMS to be implemented effectively to ensure that hazards are proactively identified and that risks are mitigated to an acceptable level. The Railway Safety
187 S.M. Southwick and D.S. Charney, Resilience: The Science of Mastering Life's Greatest Challenges, New York, Cambridge University Press, 2012.
TRANSPORTATION SAFETY BOARD OF CANADA 180 Management System Regulations, 2015 (the SMS Regulations), under which railways are responsible for managing their safety risks, stipulate that railways need to have a process to identify safety concerns and to implement and evaluate remedial action. Under the SMS Regulations, railways must also analyze their railway operations to identify any trends, emerging trends or repetitive situations. Since 2015, TC has made significant progress in developing and implementing a program to educate industry and train staff to the new regulations, and to conduct a comprehensive audit program to ensure railway operators have an SMS that is in compliance with regulations. Railways have demonstrated that, on paper, they have all the elements required by the SMS Regulations, but safety data are not showing the expected improvements associated with an SMS that has been operational for 20 years. Although some companies consider safety to be adequate as long as they are in compliance with regulatory requirements, regulations alone cannot foresee all risks unique to a particular operation. Effective safety management includes a need to continuously identify and mitigate hazards to manage risks. This is influenced by an organization’s safety culture, which is characterized by shared values, attitudes, perceptions, competencies, and patterns of behaviour that interact toward enhancing safety. 2.8.3.1 Data collected from wheel temperature detectors Under Section 13 of the SMS Regulations, railway companies are required to analyze data collected from safety monitoring technologies to identify safety concerns, trends or emerging trends, or repetitive situations. WTD data, as a safety monitoring technology, are subject to this provision. As part of the post-derailment investigation, the WTD data for the 5 previous westbound grain trains were requested from CP and analyzed. The analysis indicated the trains had operated in various ambient temperatures from −2 °C to −26 °C and that a significant percentage of cold wheels were detected on these trains when they passed by the WTD located at Mile 130.2 on the Laggan Subdivision. The data generally showed that the number of cold wheels increased significantly on trains that had operated in the colder temperatures. Two trains had been scanned by the WTD when the ambient temperature was below −25 °C, similar to the temperature on the day of the occurrence. For each of these 2 trains, about 56% of the cars were deemed to have ineffective brakes. Overall, these WTD analysis results corroborate the adverse effect that temperature can have on the braking performance of grain trains. Finding as to causes and contributing factors Even though WTD data were being collected and showed high percentages of ineffective brakes on grain trains in the 2 cold days before the occurrence, CP was not analyzing these data and did not initiate any specific action or corrective measures. 2.8.3.2 Hazard reporting In accordance with the SMS Regulations, railway companies must conduct, on a continual basis, analyses of their railway operations to identify safety concerns, current or emerging
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 181 trends, or any repetitive situations. The analyses must be based on information such as reports of safety hazards submitted by employees and data from safety monitoring technologies. A review of safety hazard reports submitted to CP’s CCFHSC prior to the occurrence revealed multiple instances where train crews operating loaded unit grain trains that were travelling westward and descending Field Hill in winter operating conditions experienced difficulties controlling train speed. These reports documented air brake performance issues on unit grain trains that had successfully passed a No. 1 brake test. According to the SMS Regulations and CP’s Reporting Contraventions, Safety Hazards and Identifying Safety Concerns Procedure, safety hazard reports submitted by employees must be analyzed to identify trends or repetitive situations. There is no indication in the CCFHSC records that such an analysis was carried out, even though the reported hazard conditions were recurring. In addition, the severity of the hazard reports was not consistently rated. Furthermore, some reports were closed out without any clear identification of the corrective action undertaken, nor any indication of verification that the action had been completed or was effective. Members of the CCFHSC were aware that loaded grain trains, even ones that passed a pre- departure air brake inspection, were experiencing speed control difficulties on Field Hill. The meeting minutes from August 2018 indicated that the train crews had requested that the scanner at Mile 130.2 of the Laggan Subdivision be used for observing cars whose air brakes were not working. Nevertheless, the meeting minutes indicated that individual notifications of this hazard were closed, yet new similar reports continued to be recorded through the reporting system. Finding as to causes and contributing factors Although CP’s procedure for safety hazard reporting was actively followed at the Calgary terminal, the follow-up process was not effective at analyzing trends and resolving safety issues related to the performance of air brake systems in extreme cold temperatures on the grain car fleet operating on the Laggan Subdivision. 2.8.3.3 Risk assessments Risk assessments are a cornerstone of a fully functioning and effective SMS, and are essential for a safe operating company. According to the SMS Regulations, railway companies must conduct a risk assessment in the following circumstances, among others: • when a safety concern is identified through an analysis of the railway’s operations; • when a proposed change to the railway’s operations may affect the safety of the public or personnel or the protection of property or the environment; and • when there is a change affecting personnel, including an increase or decrease in the number of employees or a change in their responsibilities or duties.188
188 Transport Canada, SOR/2015-26, Railway Safety Management System Regulations, 2015 (as amended 01 April 2015), section 15.
TRANSPORTATION SAFETY BOARD OF CANADA 182 2.8.3.3.1 Risk assessment of safety hazard reports CP’s SMS requires that a risk assessment be performed when a safety concern (a hazard or condition that may present a direct safety risk to employees, or pose a threat to safe railway operations) is identified through analysis of safety data. Train crews consider the poor braking performance of unit grain trains to be a hazard that may present a direct safety risk to employees and pose a threat to safe railway operations. Consequently, when crews were having difficulties controlling their trains on Field Hill, they filed safety hazard reports. The review of the CCFHSC meeting minutes dating back as far as December 2016 show that, for at least the 3 winters before the occurrence, crews had filed hazard reports on this issue regularly through the proper channels. Still, year after year, the reports on the poor braking of unit grain trains on Field Hill were closed, no risk assessment was conducted, and insufficient corrective action was taken. Finding as to causes and contributing factors CP did not consider that the trend in safety hazard reports represented a “safety concern” per the SMS Regulations and it did not take sufficient action to address the underlying causes of ineffective braking of unit grain trains descending Field Hill in extreme cold temperatures. Not considering the trend in safety hazard reports submitted by the crews to be safety concerns implies that CP considered the use of full braking capacity and emergency braking on Field Hill to have been an acceptable operating practice. Finding as to risk When operating practices to use a train’s full braking capacity to control speed on mountain grades become normalized, the safety margin is seriously compromised, increasing the risk of an accident. 2.8.3.3.2 Risk assessment of changes to the Field Hill operating procedures While important for day-to-day operations, risk assessments are particularly crucial when a company makes a change to its operations, since this is when new hazards may emerge. In the 10 years preceding the occurrence, CP had made several incremental changes to the FHOP, including • changes to the speed threshold at which trains were permitted to descend Field Hill, • changes to the requirements for retainers and hand brakes after an emergency on Field Hill, and • the introduction of a new requirement to hold a job briefing with a trainmaster after an emergency stop, and the transfer of decision authority to the trainmaster. CP did not conduct a risk analysis to assess how these changes would impact safety. To ensure that an equivalent level of safety is maintained when changing an operating policy or procedure, railways must analyze the impact of the forthcoming changes on train operations and determine what new hazards, if any, may be introduced. Mitigation measures can then be put in place and monitored to assess their effectiveness.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 183 Finding as to risk If railway companies modify their policies and procedures without identifying all hazards in advance, appropriate risk mitigation measures may not be implemented, increasing the risk that safety margins will erode. 2.8.3.3.3 Risk assessment of the change in conductor training on the FHOP CP has a training program for conductors who will be operating on the Laggan Subdivision. The training, which is focused on mountain and heavy grade operations, is in addition to the general conductor training. In 2017–2018 this program was accelerated, because there was a greater demand for conductors due to increased traffic levels. The new requirements for a conductor to work on Field Hill were reduced to classroom review of the FHOP using job aids and track schematics. The simulation trips on Field Hill were removed and conductors were no longer required to be Field Hill–certified. The SMS Regulations require that railway companies ensure that employees performing duties essential to safe railway operations (such as conductors) have the skills and qualifications required to perform their duties safely. However, when CP changed its training program for conductors on the Laggan Subdivision, it did not conduct a risk assessment of this change. 2.8.3.3.4 Risk assessment based on automated train brake effectiveness research data In 2015, TC, the National Research Council of Canada (NRC) and CP initiated a joint research project to assess ATBE inspection technology as an alternative to, or in combination with, the No. 1 brake test. The results of this study, which was published on 04 October 2018, showed a high frequency of unit grain cars that had cold wheels while braking and greater variability in wheel temperature. Researchers then conducted a comparative study between No. 1 brake test data and ATBE data. This study showed that No. 1 brake test identified only a very small fraction of the cars with ineffective brakes that ATBE could detect. These findings suggested that the No. 1 brake test may not be reliable for loaded unit grain trains operating on mountain grade. Finding: Other Neither CP nor TC, who were integral participants in the development and implementation of the ATBE research, used the study’s findings on the condition of the grain hopper car fleet to initiate a risk assessment of unit grain train operations. 2.8.4 Safety culture The 2007 report on the review of the Railway Safety Act (RSA) notes, “[t]he cornerstone of a truly functioning SMS is an effective safety culture.”189 An effective safety culture in a railway can significantly reduce the number of accidents and is the basis for an effective
189 Transport Canada, Stronger Ties: A Shared Commitment to Railway Safety: Review of the Railway Safety Act (November 2007), Section 5.3, p. 68.
TRANSPORTATION SAFETY BOARD OF CANADA 184 safety program. The strength of an organization’s safety culture starts at the top and is characterized by proactive measures to eliminate or mitigate operational risks. An organization with a strong safety culture will characteristically have a strong reporting culture. Such a culture not only enables personnel to report a safety concern without fear of reprisal, but also gives them the knowledge that when a safety issue is reported, it will be thoroughly reviewed and analyzed, and appropriate action will be taken. These actions encourage a just safety culture, where the workforce knows and agrees on what is acceptable and unacceptable, and where employees are engaged in the safety issues within their organization. CP’s Home Safe initiative promotes safety engagement and feedback. Through this initiative, employees are trained to identify, report, and remove hazards. A review of 3 years of CCFHSC meeting minutes showed that train crews were actively reporting the safety hazards they encountered that were related to train handling on Field Hill. However, even though the hazards were being reported, there was very little documented action in response to the reports. Finding as to risk If hazards are not properly identified and analyzed, gaps in safety defences can continue to go unnoticed and remain unmitigated, increasing the risk of accidents. A positive safety culture is an informed culture, where hazards and risks associated with an operation are well understood and communicated. An example of risk in complex organizations like CP may be in how changes to operational procedures are assessed and communicated. For instance, CP’s FHOP were changed incrementally throughout the 10 years preceding the occurrence. These procedures are technical guidance and as such are intended to help manage some of the hazards specific to train operations on Field Hill. When incremental changes to procedures are not assessed for linkages to new safety risks at the time they are introduced, the risk to train operations may increase. CP’s SMS internal audit identified inconsistencies in how CP applied its process for managing changes to operating procedures and instructions, and how the changes were communicated to the employees. An informed culture is also one in which people within an organization are provided with the necessary knowledge and skills to work safely. CP’s training for conductors and LEs on the Laggan Subdivision does not address the challenges of train operations on mountain grade in extreme cold temperatures. Such training could raise awareness of the issues and risks associated with air brake system operations in these conditions. When hazards and risk are not communicated to those who need this knowledge to perform safety-critical tasks, risk awareness will be reduced, increasing the potential for uninformed decisions to be made. Another characteristic of a strong safety culture is the ability to learn from experience and share this knowledge throughout the organization. After distributing the NYAB General Letter GL-490, CP issued Bulletin CPSB048-13 in November 2013 as a maintenance advisory to train operations staff. This initiative allowed the dissemination of critical safety
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 185 information to alert train crews and increase their vigilance about applied air flow events caused by air leakage from the service portion of NYAB-Knorr DB-10 CCVs. However, a year later, Bulletin CPSB048-13 was rescinded, even though the issue of the NYAB-Knorr DB-10 CCVs was still present. CP continued to operate unit trains equipped with old NYAB-Knorr DB-10 CCVs, and every winter, excessive air loss from these valves led to braking problems on the trains. However, the implications of excessive leakage and the risks on the braking system and on the retainers’ residual pressure were not shared or well understood. Bulletin CPSB048-13 was an administrative control that CP put in place to address a potential hazard identified by NYAB. When the bulletin was rescinded, there was no assessment of the hazards to determine if rescinding the bulletin would change the risk to the operation. In addition, train crews were not informed of any remedial actions that were taken in place of the bulletin. An effective safety culture includes proactive actions to identify and manage operational risk. The identification of hazards within a risk assessment is critical to identifying the required mitigation measures needed, and is the foundation of an effective SMS. Finding as to risk If a railway company’s SMS is not supported by a positive safety culture, its effectiveness at identifying and mitigating hazards is reduced, increasing the risk of accidents. 2.9 Transport Canada 2.9.1 Oversight of railway safety management systems Federally regulated railways, such as CP, have been required to have an SMS since 2001. As part of the regulatory oversight of SMS, TC must be able to assess how effectively the railway is implementing its SMS. This oversight includes regularly assessing how the railway analyzes its operations to identify safety concerns, including any emerging trends or recurring situations. Since the new SMS Regulations came into force in 2015, TC has focused its efforts in working with railways to ensure that they have developed and documented the SMS in accordance with TC’s expectations. Comprehensive audits of the SMS continue to be performed to establish any gaps in this process. In 2018–19, TC completed its auditing of each federally regulated railway’s SMS to ensure that the essential SMS processes had been implemented. In 2020, TC began a 5-year audit cycle to evaluate the effectiveness of railways’ SMS.
TRANSPORTATION SAFETY BOARD OF CANADA 186 Finding: Other Even though federally regulated railways have been required to have an SMS since 2001, and the new SMS Regulations were introduced in 2015, the effectiveness of every railway company’s SMS has not yet been evaluated by TC. 2.9.2 Oversight of health and safety committee Employment and Social Development Canada (ESDC) and TC have a shared responsibility to review the functionality of CP’s health and safety committees, including the CCFHSC, as the CCFHSC involves both on-board and off-board employees. TC attends one CCFHSC meeting every 3 years, to review its effectiveness. In the last review by TC and ESDC, no issues were identified with how CP was conducting its meeting, or how it was resolving issues brought forward by employees. TC did not identify the shortcomings related to the closing of individual notifications of a recurring hazard, while similar reports continued to be recorded through the reporting system. Finding as to causes and contributing factors TC’s oversight of the occupational health and safety committee in Calgary did not identify the lack of corrective action on the reported substandard braking performance of unit grain trains descending Field Hill. 2.9.3 Oversight of the training program Railways provide TC with the information on their training programs, but TC does not assess the adequacy of these programs for each railway. There is no requirement for TC to review the course material or evaluate the program. Consequently, once railway companies have met the regulatory requirements in terms of training, consultation, and reporting, TC provides no further oversight with regard to the training of railway operating employees. Finding as to risk If there is no regulatory oversight of the relevance and effectiveness of training programs for railway operating employees, there is an increased risk that these programs will not be sufficiently robust to ensure that railway operating employees have adequate knowledge and experience to work safely.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 187 3.0 FINDINGS 3.1 Findings as to causes and contributing factors These are conditions, acts or safety deficiencies that were found to have caused or contributed to this occurrence. 1. Once the train passed Mile 126, it had entered one of the steepest grades on Field Hill. At this point, the sequence of service brake applications made by the inbound locomotive engineer, combined with the available locomotive dynamic brakes, could not maintain the train’s speed below the maximum allowable limit of 15 mph. Therefore, as required by company instructions, the crew applied the brakes in emergency, bringing the train to a stop on Field Hill at Mile 127.46. 2. The inbound crew and the trainmaster opted for retainers only, and the conductor subsequently set them to the high pressure position on 75% of the cars (84 cars) per the FHOP. Because the crew were close to the end of their shift, the rail traffic control director ordered a relief crew, who would recover the emergency brake application and complete the trip to Field. 3. About 10 minutes after the crew-to-crew transfer, the train began to roll on its own. 4. The train accelerated down the mountain, negotiating the steep descending grade and sharp curves, until it reached 53 mph, a speed well beyond the maximum authorized speed of the track. This excessive speed resulted in high centrifugal forces that, combined with lateral forces generated by moderate in-train buff forces, caused the locomotive to tip over in a 9.8° curve and derail at Mile 130.6. 5. Even though the inbound crew had experienced poor train braking performance that had required an emergency stop, the Field Hill operating procedures did not lead the crew and the trainmaster to conclude that the situation warranted applying hand brakes in addition to setting retainers. 6. Since braking performance degradation occurred seasonally on Canadian Pacific unit grain trains in extreme cold temperature, this condition had become normalized such that it was expected that close to maximum available braking would be required while descending Field Hill. 7. Although the applied air flow events were noticed and discussed, their significance as a leading indicator of brake system malfunction may not have been fully understood, resulting in a missed opportunity to accurately diagnose the diminishing effectiveness of the train’s air brake system. 8. After the job briefing, during which there was no discussion of the critical factors such as ambient temperature, brake system performance, and the significance of the applied air flow events that might have prompted the application of hand brakes,
TRANSPORTATION SAFETY BOARD OF CANADA 188 the trainmaster decided that setting retainers was sufficient after this first emergency stop. 9. Gaps in the training program meant that the inbound conductor was not aware of the need to observe brake cylinder piston position while setting retainers, and therefore retainers were likely applied to cars with ineffective brakes. 10. The trainmaster was not Field Hill–certified and had not previously experienced an emergency stop on Field Hill. As a result, his decision making likely relied on the direction outlined in the Field Hill operating procedures, which were commonly interpreted to mean that only retainers were to be applied after a first emergency stop on Field Hill. 11. The trainmaster’s training and experience did not adequately prepare him to evaluate abnormal circumstances in the complex operating environment of Field Hill. 12. Based on post-occurrence testing, it is likely that about 52 of the 112 cars on the occurrence train had reduced air brake effectiveness during the initial descent of Field Hill, and consequently an emergency brake application was necessary. 13. For the occurrence train, given the extreme cold temperature and the length of time the cars were stationary with the brakes applied, the rate of brake cylinder pressure loss on some cars with retainers set was likely excessive. 14. Twenty-seven cars on the occurrence train had DB-10 CCV service portions. It is likely that the response from these service portions to the small incremental brake applications that were made as the train was operating between Stephen and Partridge contributed to the difficulty in controlling train speed that led to the emergency brake application at Partridge. 15. It is highly probable that the air brake system on the 27 grain cars equipped with NYAB-Knorr’s DB-10 service portions and DB-20 emergency portions manufactured more than 13 years ago could not maintain adequate braking effectiveness due to excessive leakage from worn and deteriorated rubber seals on these portions. 16. Three hours and 14 minutes after the initial brake application at Stephen, the average brake cylinder pressure likely decreased to below 31 psi. This rendered the retarding force insufficient to prevent the train from starting to roll uncontrolled down the mountain grade. 17. Brake shoe friction fade occurred on the cars with effective brakes, contributing to the high speed during the uncontrolled movement. 18. Both the wheel temperature detector measurements and the safety hazard reports filed by train crews of westbound loaded unit grain trains confirm that the No. 1 brake tests performed in Alyth Yard did not adequately identify cars whose brakes
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 189 would not be fully effective in the extreme cold temperature experienced by the occurrence train while descending Field Hill. 19. From 2015 to the time of the occurrence, Canadian Pacific had not imposed restrictions on the operation of unit grain trains on Field Hill in extreme cold temperatures. 20. Even though the wheel temperature detector data were being collected and showed high percentages of ineffective brakes on grain trains in the 2 cold days before the occurrence, Canadian Pacific was not analyzing these data and did not initiate any specific action or corrective measures. 21. Although Canadian Pacific’s procedure for safety hazard reporting was actively followed at the Calgary terminal, the follow-up process was not effective at analyzing trends and resolving safety issues related to the performance of air brake systems in extreme cold temperatures on the grain car fleet operating on the Laggan Subdivision. 22. Canadian Pacific did not consider that the trend in safety hazard reports represented a “safety concern,” per the Safety Management System Regulations, 2015, and it did not take sufficient action to address the underlying causes of ineffective braking of unit grain trains descending Field Hill in extreme cold temperatures. 23. Transport Canada’s oversight of the occupational health and safety committee in Calgary did not identify the lack of corrective action on the reported substandard braking performance of unit grain trains descending Field Hill. 3.2 Findings as to risk These are conditions, unsafe acts or safety deficiencies that were found not to be a factor in this occurrence but could have adverse consequences in future occurrences. 1. If the classroom training does not address the unique needs of the territory where the employees will be working, and if the employees do not obtain the relevant on- the-job training on that territory, then they will not be adequately prepared and sufficiently trained to perform their duties safely, increasing the risk of an accident. 2. When specialist duties are transferred to a generalist position, unless technical training and operational experience bridge the gaps that exist between the 2 positions, there is an increased risk that these duties will not be performed adequately. 3. When operating employees do not receive adequate initial and recurrent training in crew resource management, including how to make decisions when authority gradients are present, crew coordination and interaction may not be effective, increasing the risk of human factors–related accidents.
TRANSPORTATION SAFETY BOARD OF CANADA 190 4. If train crews routinely operate under hazardous circumstances, such as braking performance degradation in extreme cold temperatures, each successful trip will increase risk tolerance and reduce a crew’s ability to recognize, accurately evaluate, and manage the hazards in future, increasing the risk of an accident. 5. If established design principles are not applied to the display of safety-significant information on the locomotive’s operator display screen, important cues can be missed, increasing the risk of accidents. 6. When trains operate in extreme cold temperatures, brake cylinder leakage will occur, increasing the risk that the use of retaining valves as a means to preserve braking capacity will not be effective. 7. For a train negotiating a long descending grade, where a brake application may be held for over 20 minutes, even with a brake cylinder leakage rate within the maximum acceptable limit specified in AAR Standard S-486 SCT (1 psi/minute), there is a risk that brake cylinder leakage will render the air brake system ineffective. 8. If guidance on how to respond to an emergency situation is not explicit but instead relies on employees’ interpretation of the situation, employees’ decision making may not be precisely informed, increasing the risk of an unsafe course of action being implemented. 9. If appropriate seasonal operational restrictions are not consistently activated year to year to ensure the safety of unit train operations during extreme cold temperatures in mountain grade territory, there is an increased risk of loss of control and derailments. 10. Until train brake test methodologies accurately evaluate air brake effectiveness, trains operating in extreme cold temperatures may continue to have ineffective braking, increasing the risk of loss of control and derailment. 11. Until the use of fade-resistant brake shoes is made mandatory on unit trains operating through mountain grade territory, there is an increased risk that these trains will experience brake shoe friction fade and loss of control while descending long mountain grades. 12. Until additional physical defences are put in place, there is an ongoing risk that unplanned and uncontrolled movements of railway rolling stock will continue to occur, resulting in derailments, collisions and unacceptable risk to railway employees, the public and the environment. 13. Without sufficient proficiency tests on all train crews, and without test results that consistently provide qualitative feedback, there is a risk that deficiencies in an employee’s skills, qualifications, or knowledge will not be adequately identified and that corrective actions will not be taken to improve safety.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 191 14. When designated rest facility conditions are not conducive to employees obtaining restorative rest, there is an increased risk that employees will be not be fully rested at the end of a designated rest period. 15. When operating practices to use a train’s full braking capacity to control speed on mountain grades become normalized, the safety margin is seriously compromised, increasing the risk of an accident. 16. If railway companies modify their policies and procedures without identifying all hazards in advance, appropriate risk mitigation measures may not be implemented, increasing the risk that safety margins will erode. 17. If hazards are not properly identified and analyzed, gaps in safety defences can continue to go unnoticed and remain unmitigated, increasing the risk of accidents. 18. If a railway company’s safety management system is not supported by a positive safety culture, its effectiveness at identifying and mitigating hazards is reduced, increasing the risk of accidents. 19. If there is no regulatory oversight of the relevance and effectiveness of training programs for railway operating employees, there is an increased risk that these programs will not be sufficiently robust to ensure that railway operating employees have adequate knowledge and experience to work safely. 3.3 Other findings These items could enhance safety, resolve an issue of controversy, or provide a data point for future safety studies. 1. Because the continuity of the brake pipe was never compromised in any way, and an unintentional brake release did not occur on the train before the derailment, the only remaining cause of the applied air flow was excessive leakage of air on one or more cars. This can result in depletion of brake cylinder pressure or the release of the air brakes on individual cars. 2. The running brake test at Eldon did not reveal any consequential braking anomaly because brake system leakage had not yet been exacerbated by the extreme cold, the duration of the brake applications was not long enough for the leakage to adversely affect the air brake system performance, and the train was not on the mountain grade. 3. Small incremental reductions in brake pipe pressure may not be sufficiently robust to propagate along the length of the brake pipe when there is a high-level air flow occurring simultaneously. They also can result in a pressure wave that cannot trigger the intended brake application response effectively on older or less sensitive car control valves.
TRANSPORTATION SAFETY BOARD OF CANADA 192 4. The single car test, which is usually conducted in a shop or outdoor repair track environment at warmer temperatures, does not identify defective car control valves conditions that manifest themselves in cold and extreme cold operating conditions. 5. Based on braking calculations, cars on the train yielded, on average, about 61% brake effort in response to the emergency brake application at Partridge. About 3 hours later, when the train began to roll on its own, the brake effort had degraded to less than 40% of theoretical maximum braking effort. 6. Based on the comparison of wheel temperature detector data for similar unit grain trains operating in extreme cold temperatures, i.e., below −25 °C, calculations indicate that the occurrence train was operating with at least 50% cold cars, as defined by the railway’s wheel temperature detector criteria, at the time of the occurrence. 7. Wheel temperature detector data collected in winter for trains operating in temperatures of –25 °C or less provide valuable insight into overall train braking health. These wheel temperature detector data results could be used to establish winter operating criteria for the safe operation of unit grain trains in extreme cold temperatures. 8. Neither Canadian Pacific nor Transport Canada, who were integral participants in the development and implementation of the automated train brake effectiveness research, used the study’s findings on the condition of the grain hopper car fleet to initiate a risk assessment of unit grain train operations. 9. Even though federally regulated railways have been required to have a safety management system since 2001, and the new Railway Safety Management System Regulations were introduced in 2015, the effectiveness of every railway company’s safety management system has not yet been evaluated by TC.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 193 4.0 SAFETY ACTION 4.1 Safety action taken 4.1.1 Transportation Safety Board of Canada 4.1.1.1 TSB Rail Safety Advisory Letter 04/19 The TSB sent Rail Safety Advisory Letter 04/19, “Prevention of uncontrolled train movements for trains stopped in emergency on grades of less than 1.8%,” to Transport Canada (TC) on 11 April 2019. The letter indicated in part that some leakage could create a reduced margin of safety when a train brake system is relied upon for an extended duration. It further stated that if a critical loss of brake cylinder pressure occurs due to leakage effects, an uncontrolled movement can result. Finally, the letter indicated that, based on the preliminary calculations, an uncontrolled movement of a train stopped in emergency for an extended duration can occur on grades of less than 1.8%. Given the potential consequences of an uncontrolled train movement, the letter indicated that TC might wish to ensure that effective safety procedures are applied to all trains stopped in emergency on both heavy grades and mountain grades. 4.1.1.2 TSB Rail Safety Advisory Letter 05/19 The TSB sent Rail Safety Advisory Letter 05/19, “Air brake system inspection and maintenance on grain hopper cars used in CP [Canadian Pacific] unit train operation,” to TC on 11 April 2019. The letter indicated that, following the accident, the TSB conducted air brake system testing from 08 to 10 February 2019 on the 13 grain hopper cars that did not derail. The testing determined the following: • The air brake system on these cars would not provide adequate braking effectiveness to ensure the safe operation of a loaded unit grain train in a situation where the air brakes are required to remain applied for an extended duration, such as while descending a steep grade. • Relative to the expected maximum pressure during the series of service brake applications, BCP dropped to 56% in 15 minutes. • Relative to the expected maximum pressure from the emergency brake application, BCP dropped to 61% at the end of the 3-hour test period. Because the 13 grain hopper cars represented about 11% of the 112 cars on the occurrence train, the test results generally represented the air brake performance on train 301-349 as it operated through Partridge and at the time of the occurrence.
TRANSPORTATION SAFETY BOARD OF CANADA 194 Other observations relating to the air brake performance of the occurrence train included the following: • All 13 grain hopper cars failed additional testing utilizing an automated single car test device. The ambient temperatures during testing (conducted 24 to 25 February 2019) ranged from −21 °C to −26 °C. • The Association of American Railroads (AAR) Field Manual Rule 3 and AAR Manual of Standards and Recommended Practices Section E, Standard S-486 and Specification S-4027 do not require that testing be performed at the coldest ambient temperatures to which the cars may be exposed. Therefore, test results obtained in a repair shop environment, or in moderate outdoor temperatures, may not reveal air brake performance issues that can develop during extreme cold operating temperatures. For unit bulk commodity trains operating on Field Hill, CP has implemented a number of risk mitigation measures. With warmer ambient temperatures in the spring, this seasonal relief will help restore air brake efficiency. However, given the potential consequences when uncontrolled movements occur, particularly in mountain territory, the TSB indicated that TC might wish to review the efficacy of the inspection and maintenance procedures for grain hopper cars used in CP's unit grain train operations (and for other railways as applicable), and ensure that these cars can be operated safely at all times. 4.1.1.3 TSB Rail Safety Advisory Letter 04/20 The TSB issued Rail Safety Advisory Letter 04/20, “Effectiveness of No. 1 brake test,” to TC on 17 April 2020. The letter indicated that the occurrence train, CP train 301-349, received and passed a No. 1 brake test on 03 February 2019 before departing Alyth Yard in Calgary, Alberta. The test, performed by certified car inspectors on a stationary train, verifies that the train air brake system is working as intended before the train departs. Further, the letter indicated that TC, the National Research Council of Canada, and CP initiated a joint research project on automated train brake effectiveness (ATBE) to assess ATBE as an alternative or in combination with the manual brake test currently regulated in Canada. The ATBE research examined wheel temperature data from a series of cold wheel detectors located at the bottom of long descending grades where prolonged air brake applications are required to control train speed. Researchers then conducted a comparison of ATBE data and No. 1 brake test results on a sample of 44 grain trains. The ATBE test results and the hazard notifications of train braking anomalies on Field Hill both suggest that the No. 1 brake test does not reliably identify ineffective brakes in rail cars. Given this information, TC was advised that an alternate approach to determining the effectiveness of freight car air brakes is required to ensure that departing trains have sufficient effective brakes to operate safely.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 195 4.1.2 Transport Canada On 08 February 2019, TC issued Ministerial Order 19-03 to a number of federal railways, including CP. The Ministerial Order indicated in part, When a train is stopped by an emergency brake application on a grade of 1.8% or greater (i.e. mountain grade), immediately apply a sufficient number of handbrakes, in accordance with the attached Appendix A, before recharging the air brake system to prevent involuntary movement of the equipment. Ministerial Order 19-03 was to remain in effect until cancelled in writing by the Minister of Transport. On 27 December 2019, TC provided a response to TSB rail safety advisory letters 04/19 and 05/19 indicating in part that it had commissioned SHARMA (a research and engineering consulting firm) to conduct an analysis to evaluate current practices and alternatives for train operations on mountain grade. TC expected to receive the analysis report in March 2020. On 24 April 2020, TC approved the railway industry’s proposed new Canadian Rail Operating Rules (CROR) Rule 66, Securing Equipment after an Emergency Brake Application on Grade, which outlines hand brake requirements for securing trains on heavy grades and mountain grades (i.e., any grade greater than 1.0%). On 27 April 2020, TC issued Ministerial Order 20-08, which indicated in part, [I]n order to monitor the implementation of Rule 66 of the Canadian Rail Operating Rules approved by the Minister of Transport on April 24, 2020, all companies listed in Appendix A of MO 20-08 are required to report all occurrences of emergency brake applications when a train is stopped on heavy or mountain grade to Transport Canada. This reporting will begin on July 1, 2020, and last for 12 months until July 1, 2021. The order also required reporting of all emergency brake applications to the proper authority. Also on 27 April 2020, TC ordered, pursuant to section 36 of the Railway Safety Act, that federally regulated railway companies, including CP, file with TC by 25 May 2020 a copy of all company instructions related to CROR Rule 66. These requirements came into effect on 24 June 2020. In December 2020, TC approved the use of automated train brake effectiveness technology in lieu of No. 1 air brake test requirements on CP’s unit grain trains operating between points in Western Canada and the Port of Vancouver. On 13 April 2021, Ministerial Order 19-03 was repealed as it was superseded by CROR Rule 66. On 29 July 2021, TC issued Ministerial Order 21-04, which reimplemented the requirements of Ministerial Order 20-08, requiring railway companies to report all occurrences of emergency brake applications when a train is stopped on heavy or mountain grade. The Order came into effect on 01 September 2021 for a period of 12 months.
TRANSPORTATION SAFETY BOARD OF CANADA 196 Following this occurrence, TC also undertook an occupational health and safety fatality investigation under the Canada Labour Code, Part II and as a result issued a Direction to the employer, CP, in September 2020. TC followed up with CP and verified that it had implemented corrective measures. A report of the investigation’s findings, along with recommendations, was shared with the employer and its workplace health and safety committee on 09 October 2020. 4.1.3 Canadian Pacific On 06 February 2019, CP issued System Bulletin CPSB-005-019, which revised the train handling procedures for the Laggan Subdivision with respect to recovering from an emergency brake application on mountain grades. The revised procedures indicated that, for the first 25 cars, hand brakes must be applied and retainers set to the high pressure (HP) position; the instructions also indicated that retainers must be set to the HP position on all remaining cars. On 08 February 2019, CP issued Operating Bulletin OPER-AB-015-19 informing the Calgary Terminal of a revision to the train handling procedures for the Laggan Subdivision, to take effect that same day. This bulletin stated, in part, 4.0 Cold Weather Speed Restriction If the HBD [hot box detector] at Mile 111.0 reports a temperature of -20 degrees Celsius or below, all movements with a Weight Per Operative Brake of 100 tons or greater must not exceed 10 mph between Signal 1267 and Field. 5.0 Undesired Release All westward movements experiencing an undesired release of the air brakes between mile 125.7 and Field must stop, avoiding stopping the train inside the spiral tunnels if possible. Retainers must be set in the High Pressure (HP) position on 100% of the loaded cars. All undesired releases of the brakes must be reported immediately to the RTC, who in turn will advise the Trainmaster. 6.0 Emergency Brake Application Recovery (All Trains) The following instructions apply to all trains stopped by an Emergency brake application on a Mountain Grade.
- The conductor must immediately secure the movement with hand brakes as per
GOI Section 4 Appendix A.190 On 12 February 2019, CP began testing wheels on all westbound grain trains passing by cold wheel sites installed on the Laggan Subdivision (Mile 130.2) and on the Mountain Subdivision (Mile 30.2, Mile 95.1, and Mile 111.7). As a result, over 5000 grain cars were found to have bad brakes and were bad ordered. In addition, also on 12 February 2019, CP began collecting and monitoring ATBE data for its grain car fleet to establish the effectiveness and accuracy of the process. Based on the results, the ATBE initial algorithms were adjusted for application to the grain car fleet.
190 This bulletin would require a train the same weight as the occurrence train to have 98 hand brakes applied if it were stopped in emergency at the same location as the occurrence.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 197 On 25 February 2019, CP issued System Bulletin CPSB-009-19 regarding a revision to Section 1, Item 32.10B of the General Operating Instructions. This revision stated, During weather conditions described above, when trains are approaching a location which will require the use of the train air brake, the locomotive engineer must make an effective minimum brake application sufficiently in advance of that location to determine that brakes are working properly. On 04 March 2019, CP made it mandatory, under its cold wheel repair program, to replace the 4 reservoir gaskets before conducting the single car test (SCT). CP also made it mandatory to use a calibrated soap and an applicator brush. On 07 March 2019, CP issued System Bulletin CPSB-011-19 which states, in part, Raising CP’s Number 1 brake test operative brake standard to 100% on all trains operating on the Canadian network, which is an increase from the regulatory standard of 95%. Also in 2019, CP updated the wiring in its SD70 type locomotive to support a software modification that was developed in collaboration with the manufacturer. The change includes dynamic brake enhancements for distributed power trains to retain dynamic braking on all remote locomotives after an emergency brake application. Additional software changes, developed in collaboration with the manufacturer of CP’s General Electric locomotive fleet, were implemented in 2021. By December 2021, out of 782 locomotives, 741 (approximately 95%) had the software update installed. Following the occurrence, CP also developed an advanced locomotive engineer (LE) training (ALET) program to supplement LE skillsets and provide additional preparation for addressing adverse conditions in the field. This program was developed between April and September 2019 and integrated into LE training and requalification in October 2019. The 8- hour training, which expands on principles that were always present in the LE training programs, consists of a 2-hour refresher course on air brakes and 5 advanced simulation runs. The 2-hour air brake refresher course covers the following topics: • components and features of the air brakes • cycle braking (re-applying in a state of false gradient)191 • the effects of split reductions as opposed to heavy straightaway reductions • the effects of emergency brake application without the activation of the train • information and braking system (TIBS) • the effect of retainer valves when applied • the effect of distributed power on the brake pipe
191 When a train’s air brake system is fully charged, the difference in air pressure between the head-end and the tail-end of the train is considered a true gradient. While the train air brake system is charging, any difference between the head-end pressure and the trail-end pressure is considered a false gradient.
TRANSPORTATION SAFETY BOARD OF CANADA 198 With respect to adverse conditions, the 5 simulation runs included in the ALET program cover the following: • response to end-of-train device communication failure • response to distributed power communication failure • response to minor and major change in air flow and brake pipe fluctuation • response to an undesired release of the air brakes • cycle brake procedures on heavy and mountain grades • proper use of the dynamic brake • train braking efficiency not working as anticipated • emergency air brake recovery procedures 4.2 Safety action required On 03 February 2019 at approximately 2136 Mountain Standard Time, Canadian Pacific Railway Company (Canadian Pacific or CP) freight train 301-349, a unit grain train hauling 112 cars, was descending the steep 2.2% grade of Field Hill near Field, British Columbia, on CP’s Laggan Subdivision. When the locomotive engineer (LE) was unable to keep the train’s speed at or below the maximum allowable speed of 15 mph, the brakes were applied in emergency to bring the train to a stop at Partridge, British Columbia (Mile 127.46). After the emergency stop, it was decided to set retaining valves on 84 of the rail cars, a task that required approximately 1 hour. Retaining valves limit acceleration after brakes are released, allowing a train’s air brakes to recharge as it continues its descent. Hand brakes were not applied. It was also decided that a relief crew would take over care and control of the train and complete the trip to Field. A series of circumstances contributed to delaying the relief crew’s arrival at the train; the relief crew prepared to get underway approximately 3 hours after the emergency stop. Before the relief crew released the brakes to resume the trip, however, the train began to roll on its own, accelerating down the mountain. The runaway train travelled 3.14 miles, reaching a speed of 53 mph, but could not negotiate the sharp 9.8° curve immediately before the Kicking Horse River bridge. Two locomotives and 99 cars derailed. The 3 members of the relief crew on board were fatally injured. The investigation identified a number of safety deficiencies that contributed to the accident, including the following: • The degradation of air brake systems in extreme cold temperatures • The limitations of current train brake test methodologies to accurately evaluate air brake performance in these temperatures • The need for additional physical defences to prevent uncontrolled movement of rolling stock
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 199 • The need for better identification of hazards through reporting, data trend analysis, or risk assessments under CP’s safety management system to support risk mitigation measures 4.2.1 Reducing the risk of uncontrolled movements through the implementation of periodic maintenance requirements for brake cylinders In this occurrence, the brake cylinders on the freight cars were leaking compressed air, a situation exacerbated by their age and condition and the extreme cold temperature (the ambient temperature was in the range of −25 °C to −28 °C), reducing the braking capacity of the train’s automatic air brake system. From post-occurrence testing, it was found that about 50% of the cars on the occurrence train had reduced air brake effectiveness during the initial descent of Field Hill and, as a result, an emergency brake application was necessary. Given the extreme cold temperature and the length of time the train’s cars were stationary with the brakes applied at Partridge, the rate of brake cylinder pressure (BCP) loss on some cars was likely excessive. Consequently, about 3 hours later, the brakes could no longer hold the train, which began to roll on its own. The leakage of compressed air from air brake components is a fundamental problem in cold ambient temperatures. Air brake leakage typically increases with decreasing temperature, and can become quite pronounced in extreme cold (at or below −25 °C). Many of the seals and gaskets in the air brake system are made of rubber or a composite material. The effects of cold-weather conditions on rubber can vary, depending on its composition, age, and wear. Also, cold-weather conditions are generally known to decrease rebound resilience, making the rubber stiffer and less effective at preventing leakage. This is particularly the case for air brake components with extended time in service, such as car control valve (CCV) gaskets, brake cylinder packing cup gaskets, and brake pipe flange gaskets. Air leakage from the brake cylinders on rail cars can be especially problematic when descending a long steep grade, because a sufficient amount of BCP is needed for an extended period of time to maintain train speed. Descending the 13.5-mile Field Hill grade at 15 mph requires air brakes to remain engaged and provide a constant amount of brake retarding force for over 52 minutes. To mitigate the risk of freight cars developing excessive air leakage from the brake cylinder, it is crucial that brake cylinders undergo regular testing and maintenance. However, there are no specific industry or regulatory requirements for regular maintenance on freight car brake cylinders. The repair history for the 112 cars on the occurrence train showed that 23 cars (20.5%) had received brake cylinder replacement or servicing in the previous 5 years due to a failed single car test. Brake cylinder leakage remains the second highest failure rate during the single car test, after CCV failures. The railway industry has considered the problem of brake cylinder leakage. In 2011, the Association of American Railroads (AAR) Brake Systems Committee proposed to reduce by half the maximum brake cylinder leakage acceptable during a periodic single car test (SCT),
TRANSPORTATION SAFETY BOARD OF CANADA 200 a test which verifies the intended operation of car brakes and ensures, among other things, that the brakes remain applied and do not exceed allowable leakage rates. According to AAR Standard S-486,192 the maximum acceptable limit of brake cylinder leakage during an SCT is 1 psi/minute. At this leakage rate, the occurrence train would have lost 52 psi of BCP on the descent of Field Hill, which represents an 81.3% loss in braking capacity and, nearing the bottom of the descent, the remaining BCP on the train would have been the equivalent of a minimum reduction brake application (7 psi), which is insufficient to maintain train speed at 15 mph. In comparison, if the proposed maximum acceptable leakage rate of 1 psi/2 minutes were adopted, a train descending Field Hill would retain enough BCP to complete the descent at 15 mph with only one supplemental brake application to compensate for leakage. The proposal from the AAR Brake Systems Committee was not accepted. The industry did not consider this revision to the standard to be needed for all of North America, primarily because of the regional nature of the problem: the more stringent maximum leakage rate is only needed for steep descending grade operations in cold winter temperatures. Brake cylinders used to be subject to “clean, oil, test and stencil” (COT&S) reconditioning on a regular basis, but these requirements were eliminated by the AAR in 1992.193 Since then, the industry’s approach to brake cylinder maintenance has become one of voluntary preventative maintenance or run-to-failure. However, as this occurrence has shown, without periodic, scheduled maintenance, brake cylinder leakage can jeopardize safe train operations when sustained brake applications are required, especially in cold weather conditions. The requirements for COT&S had also been removed for CCVs in 1992. However, following a 10 January 2018 occurrence at Luscar Industrial Spur in Leyland, Alberta, in which a freight train rolled uncontrolled while proceeding down a mountain grade,194 and in response to a number of other occurrences in Canada and the U.S., the AAR reconsidered this position and made rule changes that have re-introduced a COT&S schedule for CCVs in certain circumstances.195 The AAR has defined conditions under which CCVs should be replaced due to their age and exposure to service conditions in cold-weather environments. This new requirement applies to freight cars operating north of the 37th parallel during winter months that have CCVs older than 13 years since their last COT&S date. Brake cylinders are also prone to declining performance after extended periods in service without maintenance, including lubrication and renewal of safety-critical rubber gaskets and seals. However, unlike the recent re-implementation of COT&S requirements for CCVs,
192 Association of American Railroads, Standard S-486, “Brakes and Brake Equipment Code of Air Brake System Tests for Freight Equipment – Single Car Test” (revised 2018). 193 S. Butler, “The Evolution of Freight Car Air Brake Testing on Repair Track”, presented at the Air Brake Association Technical Conference, Chicago, Illinois (14 – 17 September 1997). 194 TSB Rail Transportation Safety Investigation Report R18E0007. 195 Association of American Railroads, Field Manual of the AAR Interchange Rules (July 2021), Rule 4.A.2-3.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 201 there are no AAR requirements to service or replace brake cylinders on freight cars on a set time interval. Excessive brake cylinder leakage of freight cars on steep descending grade territory in cold ambient temperatures increases the risks that loss of control events will occur due to degraded brake capacity. Uncontrolled movements of railway equipment, although low- frequency events, can create high-risk situations that may have catastrophic consequences. For a train negotiating a long descending grade in cold weather conditions where a brake application will be held for an extended duration, such as Field Hill, with a brake cylinder leakage rate of 1 psi/minute—the maximum acceptable limit specified in AAR Standard S- 486—there is a risk that brake cylinder leakage will render the air brake system ineffective. To prevent uncontrolled movements in these situations, brake cylinder leakage limits need to be regulated to a more stringent maximum acceptable level. To mitigate the risk of freight cars developing excessive brake cylinder leakage, it is crucial that brake cylinders undergo regular, time-based, maintenance. If Transport Canada and the railway industry do not take measures to prevent excessive brake cylinder leakage on freight cars, the risk of a loss of control due to insufficient braking capacity will persist, a risk that increases on steep descending grades, especially in cold ambient temperatures. Therefore, the Board recommends that the Department of Transport establish enhanced test standards and time- based maintenance requirements for brake cylinders on freight cars operating on steep descending grades in cold ambient temperatures.
TSB Recommendation R22-01 4.2.2 Reducing the risk of uncontrolled movements through the implementation of automatic parking brake technology The issue of uncontrolled movements of railway equipment is not a new one. The TSB has pointed out the need for robust defences to prevent uncontrolled movements since 1996. On 12 August of that year, all 3 occupants in the operating cab of a locomotive were fatally injured when their train collided head-on with a cut of 20 runaway cars near Edson, Alberta.196 In its investigation report, the TSB indicated that the facts surrounding this occurrence raised some concerns, notably with respect to the secondary defences against runaways. The issue came to the forefront again in 2013 when, on 06 July, a runaway train derailed in the centre of the town of Lac-Mégantic, Quebec, destroying the town’s core and main business area, and causing the death of 47 people.197 In its investigation report, the TSB indicated that equipment runaways are low-probability events that can have extreme consequences, and the cost to human life and our communities can be incalculable. For this reason, the Board recommended that
196 TSB Railway Investigation Report R96C0172. 197 TSB Railway Investigation Report R13D0054.
TRANSPORTATION SAFETY BOARD OF CANADA 202 the Department of Transport require Canadian railways to put in place additional physical defences to prevent runaway equipment. TSB Recommendation R14-04 Since then, the trend in the number of uncontrolled movements has been on an upward trajectory. In 2014, the year after the Lac-Mégantic accident, there were 59 occurrences; in 2019, there were 78, including this one. Unplanned/uncontrolled movements of railway equipment remains a current issue and is included in the TSB’s Watchlist 2020, a list of issues that need to be addressed to make Canada’s transportation system even safer. In the years since Recommendation R14-04 was issued, in an effort to address these concerns, Transport Canada (TC) has implemented several initiatives aimed at reinforcing and clarifying requirements in the Canadian Rail Operating Rules (CROR) governing the application of hand brakes. These initiatives included a revision to Rule 112 in 2015, which provided the industry with a comprehensive hand brake application chart to respond to various operating situations when securing unattended equipment. Following the occurrence at Field, TC again modified the CROR with new requirements for the use of hand brakes. It introduced Rule 66 (Securing Equipment after an Emergency Brake Application on Grade) for the securement of trains stopped in emergency on heavy grades and mountain grades.198 The new rule also includes a comprehensive hand brake application chart. It came into effect on 24 June 2020. A hand brake is a mechanical device used to secure railway equipment and prevent uncontrolled movements. Hand brakes are installed on all railway rolling stock. They are manually applied and tightened by turning the hand brake wheel. This causes the brake shoes to be pressed against the wheel tread surface to prevent the wheels from moving or to retard their motion. For hand brakes to securely hold a train, the right number of them must be applied to generate the needed brake force. The hand brake application chart in Rule 66 indicates the number of hand brakes that must be applied on a train based on train tonnage and descending grade. For instance, given the occurrence train’s weight of approximately 15 000 tons and the average 2.2% grade on Field Hill, to meet the requirements of Rule 66, it would have been necessary to apply 75 hand brakes on the train after it had stopped in emergency. There are several factors, however, that can reduce the effectiveness of hand brakes, most notably low input torque (the amount of force applied by the operator at the hand brake wheel), service wear, and reduced coefficient of friction (COF) of the brake shoes from rail conditions such as the presence of ice or snow. When some of the hand brakes on a train are not fully effective, more hand brakes are needed to achieve the brake force necessary to hold it stationary.
198 CP defines heavy grades as grades between 1.0% and 1.8% inclusive. Grades exceeding 1.8% are defined as mountain grades.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 203 In practice, operators do not know how much force they are applying at the hand brake wheel, as hand brakes do not provide this type of feedback. Nor do they know the coefficient of friction of the brake shoes, or whether a hand brake’s effectiveness is reduced due to service wear. The only available means to determine whether a sufficient number of hand brakes has been applied, therefore, is to perform a hand brake effectiveness test. This test involves releasing the air brakes to confirm that the train does not begin to roll. If the train does roll, more hand brakes must be applied, and the test performed again. In the operating scenarios covered by Rule 66, however, this test is not feasible for a train stopped on a heavy or mountain grade. In such circumstances it would be highly risky to release the air brakes, as the train could begin to roll quite quickly and it may not be possible to stop it again. Therefore, operators must rely on the pre-determined number of hand brakes mandated by the rule. If some hand brakes on the train are not fully effective, this number may not be enough, and there is a risk of uncontrolled movement. Applying hand brakes is physically demanding and time consuming. Operators must board the car by climbing the side ladder, position themselves safely at the hand brake wheel, and crank the wheel clockwise to take up chain slack before applying maximum force on the crank. They must then dismount, walk to the next car, and repeat the manoeuvre. Applying a large number of hand brakes requires a sustained effort over several hours. As fatigue sets in, the force that operators are able to exert at each hand brake wheel may diminish over time; with lower input torque, the effectiveness of the hand brakes is reduced, requiring more hand brakes to be applied. Table 28 shows how many hand brakes would be needed to hold a 15 000-ton train on a 2.2% descending grade, assuming 55 foot-pounds input torque (the force achieved by the participants in the human performance assessment), and a coefficient of friction in the range of 0.3 to 0.4. In the presence of brake cylinder leakage, an increasingly higher number of hand brakes would be needed as the pressure drops. According to this table, the 75 hand brakes mandated by Rule 66 would be sufficient, based on a COF of 0.39, and a BCP of 10 psi. As the table shows, the number of hand brakes needed to hold a train varies greatly based on several variables, over which train crews have no control.
TRANSPORTATION SAFETY BOARD OF CANADA 204 Table 28. Number of hand brakes required at an input torque of 55 foot-pounds to hold a 15 000-ton train on a 2.2% descending grade, based on the coefficient of friction of the brake shoes and the average brake cylinder pressure* Coefficient of friction Number of hand brakes required based on average brake cylinder pressure 77 psi** 65 psi 50 psi 35 psi 25 psi 10 psi 0 psi 0.30 42 40 46 55 67 102 162 0.31 40 39 44 53 64 98 156 0.32 39 37 43 51 62 95 151 0.33 37 36 41 50 60 92 146 0.34 36 35 40 48 58 88 141 0.35 35 34 38 46 56 86 136 0.36 34 33 37 45 54 83 132 0.37 33 32 36 44 52 80 128 0.38 32 31 35 42 51 78 124 0.39 31 30 34 41 49 75 120 0.40 30 29 33 40 48 73 116 * The numbers in this table assume a net hand brake ratio of 6.5%. ** A brake cylinder pressure of 77 psi corresponds to the pressure after an emergency brake application, when there is no brake cylinder leakage. There is AAR-approved technology available for securing trains, which takes most of these variables out of the equation: automatic parking brakes for rail vehicles (APBs), such as Wabtec’s Automatic Park Brake and New York Air Brake’s ParkLoc. APB technology has been tested and approved for use on North American railways, but it has not been widely adopted. APBs are brake cylinders equipped with an automatic, mechanically operated latch that locks the brake cylinder piston as needed depending on the pressure in the brake pipe. When the brake pipe pressure is depleted (e.g., after a penalty or an emergency brake application), the system automatically locks the brake cylinder piston in the extended position, thereby retaining the brake force. This occurs without any specific intervention or action by the train crew. Once the brake pipe pressure increases again, the system automatically releases the lock and retracts the brake cylinder piston, which releases the brake force. APBs can be configured for use on both truck-mounted and body-mounted brake systems, and they can be retrofitted on existing freight cars with no need to make modifications to the air brake system. Because APBs lock the brake cylinder piston into position on the cars, their effectiveness is independent of input torque, and it is not affected by brake cylinder leakage. APBs, therefore, can hold a train on a steep grade indefinitely. Uncontrolled movements of railway equipment, while low frequency events, can create high-risk situations that may have catastrophic consequences. TSB investigations into uncontrolled movements have revealed that the sequence of events almost always included inadequate train securement. TC has made several improvements to the rules governing the application of hand brakes. However, even with a comprehensive set of rules, it has been
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 205 demonstrated over the years that depending solely on the correct application of rules is not sufficient to maintain safety in a complex transportation system. The concept of “defence in depth” has shaped the thinking in the safety world for many years. Layers of defences, or safety redundancy, have proven to be a successful approach in many industries, to ensuring that a single-point failure does not lead to catastrophic consequences. Better and more numerous administrative defences have not been successful in establishing safety redundancy against uncontrolled movements. To date, the Canadian railway industry and the regulator have yet to look beyond strengthening an administrative defense such as the use of hand brakes. Until physical defences such as automatic parking brakes are implemented across the Canadian railway network, the risk of uncontrolled movements due to inadequate train securement will persist, especially on steep grades where the effectiveness of hand brakes cannot be tested. Therefore, the Board recommends that the Department of Transport require Canadian freight railways to develop and implement a schedule for the installation of automatic parking brakes on freight cars, prioritizing the retrofit of cars used in bulk commodity unit trains in mountain grade territory. TSB Recommendation R22-02 4.2.3 Risk management through hazard identification, data trend analysis, and risk assessments A safety management system (SMS) is an internationally recognized framework that allows companies to effectively manage risk and make operations safer. Risk assessments are a cornerstone of a fully functioning and effective SMS, and are essential for safe operations. The Railway Safety Management System Regulations, 2015 (the SMS Regulations) require railway companies to conduct risk assessments, including when a safety concern is identified. However, what constitutes a safety concern is not defined in the regulatory provisions, leaving it to interpretation. To identify safety concerns, railway companies are required to conduct, on an ongoing basis, an analysis of their operations, current or emerging trends, or any recurring situations. These analyses are based on information such as reports of safety hazards submitted by employees and data from safety monitoring technologies. CP’s Reporting Contraventions, Safety Hazards and Identifying Safety Concerns Procedure defines safety concern as follows: Safety Concern-is a hazard or condition which could result in an undesired event that constitutes: • a threat to safe railway operations or could reduce the safety of railway operations; and • presents a direct safety risk to employees; railway property; property transported by the railway; the public or property adjacent to the railway.199
199 Canadian Pacific, Reporting Contraventions, Safety Hazards and Identifying Safety Concerns 2.0, (last revised 19 December 2018), section 3.1, p. 10.
TRANSPORTATION SAFETY BOARD OF CANADA 206 At the time of the occurrence, CP’s procedure outlined the situations in which a safety hazard report should be made and an analysis conducted to identify safety concerns, emerging trends or recurring situations. It also identified the steps to be followed to progressively escalate a safety issue until it was resolved. However, the investigation revealed that the process was not always being followed, that hazard reports were not always rated or assessed, and that some reports were closed out without any clear indication of the corrective action undertaken or any indication of verification that the action had been completed or was effective. Prior to this occurrence, safety hazard reports involving poorly braking unit grain trains descending Field Hill in cold winter weather had been submitted by train crews for a number of years in January and February. Although CP’s procedure for safety hazard reporting was actively followed at the Calgary terminal, the follow-up process was not effective at analyzing trends. CP did not consider that the trend in safety hazard reports represented a “safety concern,” as per the SMS Regulations, or by CP’s own Reporting Contraventions, Safety Hazards and Identifying Safety Concerns Procedure. The individual notifications of this hazard were closed, yet new similar reports continued to be recorded through the reporting system. Still, year after year, the reports on the poor braking of unit grain trains on Field Hill were closed, no risk assessment was conducted, and insufficient corrective action was taken. Since braking performance degradation occurred seasonally on CP unit grain trains in extreme cold temperature, this condition had become normalized such that it was expected that close to maximum available braking would be required while descending Field Hill. Furthermore, Transport Canada’s oversight of the occupational health and safety committee in Calgary did not identify the lack of corrective action on the reported substandard braking performance of unit grain trains descending Field Hill. CP collects data from the wheel temperature detectors (WTD) on its network. These detectors facilitate the identification of cars with cold wheels, which is an indicator of poor braking performance. The data collected in winter allow the railway to monitor the temperature sensitivity and performance of the car air brakes when they are most susceptible to leakage. WTDs are a safety monitoring technology and, as such, data collected from these systems must be analyzed to identify safety concerns, trends or emerging trends, or recurring situations. However, at the time of the occurrence, this available data was not actively analyzed by CP and an opportunity was missed to identify the hazard and mitigate any risks related to the braking performance of grain trains in extreme cold temperatures. Risk assessments must be conducted prior to implementing operational changes which have the potential to introduce new hazards or increase the level of severity of existing hazards. In the years preceding the occurrence, CP made several modifications to the operating procedures for Field Hill, such as changes to the speed threshold at which trains are permitted to descend Field Hill, and changes to the requirements for retainers and hand brakes after an emergency brake application. CP did not conduct a risk analysis to assess how these changes would impact safety. The SMS Regulations require that railway companies ensure that employees performing duties essential to safe railway operations (such as conductors) have the skills and
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 207 qualifications required to perform their duties safely. However, when CP changed its training program for conductors on the Laggan Subdivision, it did not conduct a risk assessment of this change. Since the new SMS Regulations came into effect in 2015, the TSB has investigated 11 occurrences, including this one, in which shortcomings in hazard identification, analysis of relevant railway safety data, or risk assessments were identified as a risk factor. Of these, 7 occurred in CP operations. The Board issued a recommendation to the Department of Transport related to the effectiveness of railways’ SMS in 2014, following its investigation into the July 2013 accident at Lac-Mégantic, Quebec. In its investigation report, the Board indicated that, until Canada's railways make the cultural shift to SMS, and TC makes sure that they have effectively implemented SMS, the safety benefits from SMS will not be realized. The Board recommended that the Department of Transport audit the safety management systems of railways in sufficient depth and frequency to confirm that the required processes are effective and that corrective actions are implemented to improve safety. TSB Recommendation R14-05 Since then, TC has completed its initial comprehensive audit of all federally regulated railways. As a result of these audits, TC requested corrective action plans where necessary, and stated that it continues to follow up to ensure that all railways have taken corrective action to address the findings. In its March 2021 assessment of TC’s response, the Board stated that it was encouraged by TC’s progress and looked forward to receiving information on the findings. The effectiveness of railway SMS remains a concern and is included in the TSB’s Watchlist 2020, a list of issues that need to be addressed to make Canada’s transportation system even safer. As stated in the Watchlist, federally regulated railways have been required to have an SMS since 2001, and regulatory requirements were significantly enhanced in 2015. However, since then, companies’ SMS have not produced the expected safety improvements associated with mature safety management and safety culture, as the rate of main-track train accidents has not improved. The TSB believes that railway companies’ SMS are not yet effectively identifying hazards and mitigating risks in rail transportation. Safety management will remain on the Watchlist for the rail transportation sector until safety data is collected and analyzed to reliably determine risk assessment and risk mitigation, leading to measurable safety improvement. An effective safety culture includes proactive actions to identify and manage operational risk. The identification of hazards within a risk assessment is critical to identifying the required mitigation measures needed, and is the foundation of an effective SMS. When hazards are not identified, either through reporting, data trend analysis, or by evaluating the impact of operational changes, and when the risks that they present are not rigorously assessed, gaps in the safety defences can remain unmitigated, increasing the risk of accidents. Ultimately, it is the railway companies themselves which must ensure that they
TRANSPORTATION SAFETY BOARD OF CANADA 208 have the culture, structures, and processes in place to allow for proactive identification of hazards, assessment of risks, and implementation of mitigation strategies. However, Transport Canada also has a responsibility to ensure that railway companies not only comply with the SMS regulations, but are also managing the risks in their operations effectively. Until CP’s overall corporate safety culture and SMS framework incorporate a means to comprehensively identify hazards, including the review of safety reports and data trend analysis, and assess risks before making operational changes, the effectiveness of CP’s SMS will not be fully realized. Therefore, the Board recommends that the Department of Transport require Canadian Pacific Railway Company to demonstrate that its safety management system can effectively identify hazards arising from operations using all available information, including employee hazard reports and data trends; assess the associated risks; and implement mitigation measures and validate that they are effective. TSB Recommendation R22-03 This report concludes the Transportation Safety Board of Canada’s investigation into this occurrence. The Board authorized the release of this report on 16 March 2022. It was officially released on 31 March 2022. Visit the Transportation Safety Board of Canada’s website (www.tsb.gc.ca) for information about the TSB and its products and services. You will also find the Watchlist, which identifies the key safety issues that need to be addressed to make Canada’s transportation system even safer. In each case, the TSB has found that actions taken to date are inadequate, and that industry and regulators need to take additional concrete measures to eliminate the risks.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 209 APPENDICES Appendix A – Locomotive and freight car brakes Train brakes Locomotives are equipped with 2 air brake systems: automatic and independent. The automatic brake system applies the brakes to each locomotive and to each car in the train as well; it is normally used during train operations to slow and stop the train. Each locomotive also has an independent brake system, which applies air brakes on the locomotive only. Independent brakes are not normally used during train operations, but are primarily used as a parking brake, sometimes in conjunction with the hand brake on the locomotive. Locomotives are also equipped with a dynamic brake (DB) system that makes use of locomotive traction motors to provide resistance against the rotation of axles. Automatic brake system A train’s automatic brake system is supplied with air from compressors located on each operating locomotive. The air is filtered, dried, compressed, and stored in the locomotive's main reservoirs. Air pressure in the main reservoirs is maintained between 130 and 140 psi. These reservoirs supply air to each locomotive and individual car in a train through a brake pipe that runs the entire length of the train. The brake pipe of each locomotive and rail car of the train is connected to that of the next locomotive or rail car by an end hose. The automatic brake system is equipped with a regulating valve that is used to set the air pressure supplied to the brake pipe to approximately 90 psi.200 Given a sufficient amount of time, the entire train brake system will charge to 90 psi. The time to fully charge a train brake system is dependent on train length, the ambient temperature, the positioning of locomotives throughout the train, and the amount of leakage201 throughout the train. Rail cars are equipped with the following 6 basic air brake components: the brake pipe, a car control valve (CCV), auxiliary and emergency air reservoirs, a brake cylinder, and a retaining valve (Figure A1). A CCV assembly has 2 valve portions, a service portion and an emergency portion, both affixed to a pipe bracket (Figure A2). The CCV has 3 functions: to charge the auxiliary and emergency reservoirs from the brake pipe, to apply the brakes, and to release the brakes.
200 Brake pipe air pressure can be set according to railway operating procedures. The most common brake pipe air pressure setting for freight train operations in North America is 90 psi. 201 Transport Canada regulations specify maximum allowable brake pipe leakage for train operations.
TRANSPORTATION SAFETY BOARD OF CANADA 210 Figure A1. Freight car air brake components (Source: Canadian National Railway Company)
Figure A2. Freight car control valve (Source: Canadian National Railway Company)
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 211 The brake pipe acts to supply compressed air to each car202 in the train when the train brakes are released and the system is being charged. The auxiliary reservoir on each car supplies compressed air to the brake cylinder when the brakes are applied and is recharged when the brakes are released. This action is controlled by the CCV reacting to changes in brake pipe pressure. The brake pipe acts as a signal line to apply or release/recharge the train brakes. The signal is controlled from the automatic brake valve on the lead locomotive by changing the air pressure in the brake pipe. The principle of train air brakes is based on lowering brake pipe pressure to apply the brakes and increasing brake pipe pressure to release the brakes. The train air brake system must be sufficiently charged with compressed air to operate as designed. When a freight train air brake system is sufficiently charged, the brakes are applied through a controlled reduction in brake pipe pressure. This is called a service reduction. Train brakes can be applied with a minimum application, which is the lightest brake possible, and gradually applied harder in stages until a full service203 application is achieved. A service train brake application can be incrementally increased until a full-service brake application is achieved, but it cannot be incrementally released; it can only be fully released. To apply the train brakes harder than a full-service application requires an emergency204 brake application. This is done by venting the brake pipe air at an uncontrolled rate, allowing the pressure to drop rapidly to 0 psi. Once an emergency brake application is initiated, the drop in brake pipe pressure to 0 psi cannot be stopped. The CCV on a freight car reacts to an abrupt drop in air pressure by allowing air pressure stored in the emergency reservoir to flow into the brake cylinder. The auxiliary reservoir is also used during an emergency brake application. This causes a faster and higher build-up of brake cylinder pressure, resulting in a harder brake application and a faster stop. When a normal automatic brake application is required, the locomotive engineer (LE) moves the automatic brake valve handle (Figure A3) to the desired position. This action removes air from the brake pipe at a service rate. As each CCV senses a sufficient reduction in pressure, air flows from the auxiliary reservoir located on each car into that car's brake cylinder, applying the brake shoes to the wheels.
202 Both the auxiliary and emergency reservoir on each car will charge to the same pressure as the brake pipe through the CCV. During normal operation, only the auxiliary reservoir is used to supply air to the brake cylinder. Emergency reservoir air is maintained until needed. 203 A full service brake is achieved when the air pressure in the auxiliary reservoir equalizes with the air pressure in the brake cylinder and the brake pipe. Further brake pipe service reductions will not apply the brakes any harder. 204 Provided that brake pipe pressure is above 40 psi, when the brake pipe air pressure drops at a rapid rate, it will cause the auxiliary and emergency reservoirs to equalize with the brake cylinder. This causes higher pressure in the brake cylinder than is possible with auxiliary air pressure alone.
TRANSPORTATION SAFETY BOARD OF CANADA 212 Figure A3. Automatic brake valve handle (Source: Canadian National Railway Company)
To release the brakes, the LE moves the automatic brake valve handle to the release position. This action allows air to flow from the main reservoir back into the brake pipe, restoring pressure to 90 psi. Sensing an increase in brake pipe air pressure, the CCV on each car allows air to be released from the brake cylinder through its retaining valve, and the brake shoes are removed from the wheels. To reapply the train brakes after a release requires the brake pipe pressure to again be reduced using the automatic brake valve. Before reapplying the train brakes, the system needs time to recharge. Not allowing sufficient time for the system to recharge may result in the brakes not applying or unintentionally releasing after a short time. Independent brake system On a locomotive, the independent brakes are also supplied with air from the main reservoir. Unlike the automatic brake system, the independent brake system is a direct air system. An independent brake valve controls a relay valve that will allow air from the main reservoir to flow into the brake cylinders on the locomotives only. When a full independent brake application is required, the LE moves the independent brake valve handle (Figure A4) to the full application position, and air pressure is supplied to the locomotive brake cylinders. This causes the brake shoes to apply to only the locomotive wheels. Brake cylinder pressure can also be gradually increased or decreased as needed by moving the brake valve handle in the application zone. To release the independent brakes, the LE moves the independent brake valve handle to the release position. This causes air to be released from the locomotive’s brake cylinders, and the brake shoes are removed from the locomotive wheels. Air pressure in the locomotive brake cylinders is relative to the position of the independent brake valve handle.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 213 Figure A4. Independent brake valve handle positions (Source: Canadian National Railway Company)
Control valves Each car is equipped with a CCV, which is comprised of a service and an emergency portion. The train locomotive air compressors supply air pressure to each freight car through the brake pipe. Brake pipe air pressure comes through the branch pipe tee, then is fed to the CCV through the cut-out cock. The CCV supplies compressed air to the combined reservoir, included on each freight car. The combined reservoir comprises 2 separate sections: an auxiliary reservoir (handling the service brake applications), and an emergency reservoir (mainly supplementing air pressure for an emergency brake application). When the freight car is fully charged (when the brakes are released), the pressure is equal to 90 psi in the brake pipe, as well as in the auxiliary and emergency reservoirs. During an automatic brake application, brake pipe pressure is reduced, which in turn signals the CCV to apply the brakes by directing air from the auxiliary reservoir into the brake cylinder on the freight car, thus extending the piston, moving the brake beams and setting the brake shoes against the wheels. During each service brake application, the brake pipe and auxiliary reservoir pressures are equal on the freight car. The CCV monitors any pressure differential between the brake pipe and the auxiliary reservoir. Brakes are released when brake pipe pressure increases by 1.5 to 2 psi above auxiliary reservoir pressure. When an emergency brake application is initiated for the train, it is due to either the LE putting the air brake handle in emergency, or the freight car end hoses coming apart between cars. In either case, the CCVs sense the very rapid discharge of air pressure from brake pipe (brake pipe pressure would drop to 0 psi at a rate of 900-950 feet per second) and directs air pressure from both the auxiliary and emergency reservoirs into the brake cylinder to apply the maximum available braking force and bring the train to a stop. Finally, when brakes are released, brake cylinder air pressure flows back through the CCV and is exhausted into atmosphere through the retaining valve.
TRANSPORTATION SAFETY BOARD OF CANADA 214 Air flow display On locomotives equipped with operator display screens, the air flow is displayed in a box identified as “Flow” (Figure A5). The value displayed on the screen indicates the amount of air flow into the brake pipe in cubic feet per minute (CFM). This type of air flow indicator displays 0 when the demand for air falls below 20 CFM. Figure A5. GE operator display screen, with air flow indication circled (Source: General Electric, with TSB annotation)
When the train brake system is being charged, the air flow indicator will display a large value, typically higher than 60 CFM. This indicates that there is a high flow of air into the brake pipe. As the system becomes charged, the value displayed will come down, indicating a decrease of flow. When the value on the air flow indicator stops falling and stabilizes, it indicates that the demand for air is steady and the system is fully charged. The pressure-maintaining feature of the automatic brake valve will compensate for brake pipe leakage. If there is leakage in the brake pipe, the flow value may not reach 0 CFM when the train brake system is fully charged. Because the air flow indicator measures the rate of air flow to the brake pipe, it can also indicate • the rate at which a train is being charged or recharged; • a heavy demand of air in the brake pipe, if a hose has separated or ruptured; or • a flow of air into the brake pipe as the pressure-maintaining feature of the automatic brake valve compensates for normal leakage.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 215 If the air flow indicator shows an increased air flow while the brakes are applied, it could indicate that • the brakes are releasing (unintentional release); • somewhere in the train, a brake pipe coupling hose has come apart; • somewhere in the train, there is a hose or brake pipe rupture; or • there is excessive leakage. Brake pipe pressure maintaining Pressure maintaining is a feature of the automatic brake valve that allows air to flow into the brake pipe at a controlled rate to overcome normal brake pipe leakage without causing the brakes on the train to release. During service brake applications, it allows the selected brake pipe pressure reduction to be maintained for long periods of time. This feature allows trains to descend long mountain grades with the brakes applied as needed. Without brake pipe pressure maintaining, leakage will cause the brake pipe pressure to continue falling after the brakes have been applied. Eventually, the brake pipe pressure will drop to 0 psi. Controlling train speed on long descending grades is difficult without brake pipe pressure maintaining. Pressure maintaining is always functioning when a locomotive is set up to be the lead or controlling remote locomotive on the train. Pressure maintaining is disabled on locomotives set up for trail operation.205 Emergency braking An emergency brake application is the maximum application of a train’s air brakes during which the brake pipe pressure is rapidly reduced to 0, either from a separation of the brake pipe or operator-initiated action. Following an emergency brake application, the air from the auxiliary and emergency reservoirs combine in the brake cylinder. When brake pipe pressure is below 45 psi, a rapid reduction in brake pipe pressure cannot be relied upon to initiate an emergency brake application. Pressure retaining valves A pressure retaining valve, commonly called a retainer, is a manually operated valve that can be used to limit the release of air pressure from the brake cylinder after the automatic brake is released. The retainer has 3 settings, which are set by rotating the handle into the appropriate notches: • The Direct Exhaust (DE) setting, also known as Exhaust (EX), which lets all the air pressure exhaust to the atmosphere. This is the default setting of the retainers on trains.
205 When a locomotive is to be used in a trailing position in a multiple-unit locomotive consist, the MU-2A valve on the locomotive must be set to “Trail.” This setting allows the air brake system on the trailing locomotive to be controlled from the lead locomotive.
TRANSPORTATION SAFETY BOARD OF CANADA 216 • The High Pressure (HP) setting, which is designed to nominally hold up to 20 psi of compressed air in the brake cylinder after the car air brake is released. This may help hold the train in a stationary position or control the speed while the air brake system is being recharged. In a situation where the cylinder pressure is less than 20 psi at the time when the air brake is released, the retainer will initially hold whatever pressure existed at that time. • The Slow Direct (SD) setting, where brake cylinder pressure is fully depleted to atmosphere, but at a much slower rate, when a brake release is commanded. The HP and SD settings become effective only after releasing the initial brake application. The use of retainers does not provide any additional brake retarding force while the train brakes remain applied. Rather, the retainers are intended to provide a residual amount of braking force after the train brakes (automatic air brakes) are released. Dynamic brakes The DB system is designed to be used as a supplementary braking system to the train air brake system. The DB system operates by electrically converting the traction motors of a moving locomotive into electric generators. One of the characteristics of a generator (traction motor) is to resist rotation when it is producing electricity. This resistance is caused by a magnetic field through which the traction motor armature rotates. The movement of the DB handle controls the strength of the magnetic field and the retardation effort. When DB is applied, traction motors are reversed, exercising a drag or braking effect on the train. The rotation of the traction motor armature through the magnetic field generates a current. This current is then sent to the resistor grids that produce heat. Fans mounted on the locomotive roof cool the resister grids and the heat is dissipated to atmosphere. When only the locomotive DB is used, compressive or “buff” forces are concentrated behind the locomotives. When DB used in combination with train air brake systems, these forces are more evenly distributed throughout the train. DB use on long mountain grades prevents brake shoe friction fade on the locomotives because the locomotive traction motors provide resistance. There is no contact between wheel treads and brake shoes and no frictional heat is generated. When DB is used to supplement the train air brakes, less air brake force is needed, reducing the likelihood of brake shoe friction fade on the train and making it possible to reserve train air brake capacity for use in the event of an emergency.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 217 Appendix B – Inspection and testing of air brake systems No. 1 brake test In accordance with the requirements of Transport Canada–approved Railway Freight and Passenger Train Brake Inspection and Safety Rules and CP’s General Operating Instructions, the No. 1 brake test is conducted by certified car inspectors at locations where trains are made up or at specified locations for trains in service. The inspectors conducting the test must verify the brake pipe integrity and continuity, and the brake rigging condition on each car to ensure that the brakes meet the minimum requirements. During the test, the brakes are applied and then the brake cylinder pistons are visually verified to ensure that the brakes have applied on each car and that the extension of brake cylinder piston is within specifications. After the brakes have been released, a second visual verification of the brake cylinder pistons is performed on each car to ensure that the brakes have in fact released. All trains departing designated safety inspection locations require at least 95% of the air brakes to be operative.206 The Transport Canada–approved Railway Freight and Passenger Train Brake Inspection and Safety Rules set the requirement for a No. 1 brake test as follows: 11. No.1 BRAKE TEST 11.1 A No.1 brake test shall be performed by a certified car inspector(s) at safety inspection locations on:
a) trains that are made up at that location;
b) cars added to a train at that location;
c) cars that are interchanged.
d) If a train is made up at other than a safety inspection location, a No. 1 brake test will be performed at the safety inspection location designated for that train by the railway company in the direction of travel. 11.2 Exceptions: A No.1 brake test is not required on:
a) trains operating over main tracks, between yards, up to a maximum of a thirty (30) mile (fifty (50) kilometre) radius. Such trains shall be engaged exclusively in the setting off or lifting of equipment at industry(s), and/or the transfer of equipment between yards, and they shall be filed with the Department.
b) a block swap of cars that have been off air for no more than 24 hours or 48 hours after notifying the department. 11.3 A No.1 brake test shall verify:
206 ”’[O]perative’ means a brake that applies and releases and is in a suitable condition to retard and/or stop equipment.” (Source: Transport Canada, Railway Freight and Passenger Train Brake Inspection and Safety Rules [17 November 2017], Section 3.24.)
TRANSPORTATION SAFETY BOARD OF CANADA 218
a) the integrity and continuity of the brake pipe;
b) that the condition of the brake rigging on each car in the train meets the minimum requirement specified in Sections 20, 21 and 22 of these Rules;
c) that the application and release of the brakes on each car is performed by visible verification of the piston or brake indicator device displacement; and
d) that piston travel on each car is within the specified limits. 11.4 A pull-by inspection by a certified car inspector may be performed to verify the release of the train brakes. 11.5 Certified car inspectors shall report, in accordance with company procedures/work instructions, the results of all brake tests performed. Any brake system defect(s) discovered during the brake test and not repaired prior to departure shall be documented as bad order and reported to the conductor, or in his or her absence, the locomotive engineer. The conductor/engineer shall update the train brake status system with the identified defect(s). The results of the tests performed by certified car inspectors shall be retained for ninety-two (92) days. 11.6 After completing a No.1 brake test, a train may depart from a safety inspection location with ninety-five (95) percent of the train brakes operative, once every reasonable effort has been made to maintain one hundred (100) percent operative brakes. This requirement does not apply to cars referred to in Subsection 8.4 of these Rules. 11.7 A No. 1 brake test is not required at an interchange point and/or when entering Canada provided the locomotive engineer has access to records that indicate that a No.1 brake test, as per these Rules, or an initial terminal brake test by mechanical personnel in the United States, was performed.207 Single car test A single car test208 (SCT) verifies the operation of the air brake system on an individual car. Although testing can be performed outside on a designated repair track, the test is more often performed inside a repair shop facility at room temperature. The device used to conduct this test is equipped with a special control valve and flowmeter to verify the essential braking functions. During the test, pressure loss is measured in the brake cylinders for 4 minutes following a reduction of 10 psi in the brake pipe. The allowable pressure loss is 1 psi (or less).
207 Transport Canada, Railway Freight and Passenger Train Brake Inspection and Safety Rules (17 November 2017), Part II: Brake Test Requirements, Section 11: No. 1 Brake Test, pp. 12–13. 208 SCTs are performed in conformance with AAR Standard S-486.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 219 According to the Field Manual of the AAR Interchange Rules, a SCT is required: • when a car is on a repair track or in a shop and has not received a SCT for more than a year; • when a car has been in service without having had a SCT for a period of 5 years; or • when a car has been in service without having a test done for a period of 5 years (8 years for new cars).209 The automated single car test (ASCT) is routinely used by railway maintenance personnel for inspecting, testing, and diagnosing car air brake system issues. In addition to testing for pronounced leakage (system, brake pipe, retainer leakage, reservoir), the ASCT will test such things as minimum application, service valve stability, service release, emergency vent valve operation, emergency accelerated release, and the operation of the empty/load device. The test is not actually a single test, but rather a test program involving a progressive series of test steps, each individually designed to assess a particular aspect of air brake performance. Each test step must be successfully completed before progressing to the next step. If a given test step fails, the underlying problem must be investigated and repaired. Once the repair is completed, the test program is restarted to allow the test program to progress to the next test level. In a shop environment, the sequence of testing, troubleshooting, repairing, and retesting would be followed until all test steps are successfully passed. Brake cylinder leakage test The test procedure for brake cylinder leakage involves the following steps:
- Apply a 10 psi brake reduction.
- Wait 3 minutes after the brake pipe pressure has stabilized at 80 psi.
- Take a reading of the pressure on the brake cylinder gauge.
- Wait 1 minute.
- Recheck the brake cylinder pressure.
209 Association of American Railroads, Field Manual of the AAR Interchange Rules (2018), Rule 3, Chart A.
TRANSPORTATION SAFETY BOARD OF CANADA 220 Appendix C – Maintenance history of the cars on the occurrence train The 112 grain cars on the train were assembled from 3 separate fleets of hopper cars, each with a different maintenance history. The investigation reviewed the replacement history of brake components, in particular the brake shoes, the brake cylinders, and the car control valves (CCVs). The cars from each fleet were equipped with different brake systems and brake configurations (Table C1). The air brake arrangements on all cars were compliant with Association of American Railroads (AAR) specifications S-400 and S-401. Table C1. Brake system configuration of the 112 grain cars on the occurrence train Fleet Number of cars Brake cylinder type Comments SOO 29
Truck-mounted
Wabco TMX and New York Air Brake (NYAB) TMB-60 equipped with automatic slack adjuster SOO 22 Body-mounted Wabco or NYAB equipped with automatic slack adjuster Leased 21 Body-mounted Wabco or NYAB equipped with automatic slack adjuster Canadian Pacific* 40 Truck-mounted Wabcopac/Nycopac not equipped with slack adjuster
- 2 cars in the CP 384000-384999 series and 38 Government of Canada cars in the CP 600000–608591 series
Brake shoe replacements Table C2 breaks down the total number of brake shoes replaced on the 112 cars during the previous 5 years according to the temperature categories used for the wheel temperature detector (WTD) data in section 1.19.2.3: cold (less than 100 °F), marginal (from 100 °F to 150 °F) and adequate (greater than 150 °F). Table C2. Number and percentage of brake shoes replaced on cars in the occurrence train from 2014 to 2019, by car average temperature ranking Car average temperature ranking Number of cars Brake shoes replaced Percentage of brake shoes replaced per car Adequate 67 858 12.8 Marginal 25 333 13.3 Cold 20 258 12.9 Car control valve replacements The maintenance history indicates that a total of 70 CCV portions were replaced on the 112 cars during the last 5 years. Considering that each car has 2 valve portions (a service portion and an emergency portion), this represents a replacement rate of 31% in the 5 years. Table C3 breaks down the number of valve replacements for cars in each wheel temperature category.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 221 Table C3. Number and percentage of car control valves replaced on cars in the occurrence train from 2014 to 2019, by car average temperature ranking Car average temperature ranking Number of cars Valves replaced Percentage of valves replaced per car Adequate 67 29 21.6 Marginal 25 22 44.0 Cold 20 19 47.5 Single car tests Table C4 shows the total number of single car tests performed on the 112 cars during the last 5 years, broken down by the temperature categories. Table C4. Number of single car tests performed on the cars in the occurrence train from 2014 to 2019, by car average temperature ranking Car average temperature ranking Number of cars Single car tests Percentage of single car tests per car Adequate 67 105 1.57 Marginal 25 57 2.28 Cold 20 55 2.75 Brake cylinder replacements There are no AAR requirements to service or replace brake cylinders on freight cars on a time-based interval. The repair history for the 112 cars shows that 23 cars (20.5%) had received brake cylinder replacement or servicing in the last 5 years due to a failed single car test (Table C5). Table C5. Number and percentage of cars from the occurrence train with brake cylinders replaced following a failed single car test, by type of brake cylinders installed, from 2014 to 2019 Brake cylinder type Number of cars Cars with cylinders replaced (%) Truck-mounted Wabcopac 40 14 (35%) Truck-mounted Wabco TMX 51 7 (13.7%) Body-mounted 21 2 (9.5%) Total 112 23 (20.5%)
TRANSPORTATION SAFETY BOARD OF CANADA 222 Appendix D – Itemized list of train handling events The tables in this appendix describe train handling events compiled from locomotive event recorder (LER) data. The LER data from the mid-train remote locomotive (UP 5359) were used as the primary source of information. Although the locomotive was extensively damaged in the derailment, the LER memory module survived the accident and the LER data were successfully retrieved. Selected LER information from the tail-end remote locomotive (CEFX 1040) was included as well, where necessary. The data cover train handling events leading up to and including the train stopping in emergency on Field Hill. Locomotive event recorder data for train handling events, by event In these tables, • “H/E Mile” refers to the mile at which the front of the head-end locomotive was located. • “TE/DB (kip)”210 refers to the force, in kilopounds, produced due to the application of tractive effort or dynamic brake (DB). • “ER (psi)” refers to the pressure, in pounds per square inch, produced by the equalizing reservoir. • “BPP (psi)” refers to the brake pipe pressure in pounds per square inch. • “IND (psi)” refers to the pressure, in pounds per square inch, produced by the locomotive independent brake. • Air flow values do not represent total brake pipe flow; they represent only the flow from the air brake system in the mid-remote locomotive (UP 5259), which was 1 of the 3 operative sources of compressed air on the train. • The DB changes shown are those DB levels concurrent with changes to speed and air brake. Table D1. The train enters Eldon siding, pulls down, and stops at the west end to clear the main track for an opposing train meet. Item Time (MST) H/E Mile Speed (mph) Throttle position TE/DB (kips) DB notch ER (psi) BPP (psi) Air flow (CFM) IND (psi) 1 19:02:04 105.71 22 T6 46 0 89 88 0 0 2 19:07:18 106.96 10 T3 36 0 82 81 0 0 3 19:07:31 107.00 9 T2 17 0 79 79 0 0 4 19:09:40 107.14 0 Idle 0 0 80 78 0 53
210 1 kip = 1000 pounds
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 223 Table D2. The train is getting ready to depart Eldon siding but, because of a problem with the dual-control power switch at the east end of the siding, the train makes a reverse move eastward to back out of the siding, down an average 0.55% grade. Item Time (MST) H/E Mile Speed (mph) Throttle position TE/DB (kips) DB notch ER (psi) BPP (psi) Air flow (CFM) IND (psi) 5 20:19:22 107.15 0 T1 0 0 89 85 89 71 6 20:19:39 107.15 1 T2 51 0 89 87 78 0 7 20:19:50 107.15 2 T3 51 0 90 87 67 0 8 20:21:53 106.77 18 T2 16 0 90 88 29 0 9 20:22:03 106.72 18 T1 4 0 90 88 27 0 10 20:22:31 106.57 19 Idle 0 0 90 88 26 0 Table D3. The train speed has just reached 21 mph and the maximum allowed speed is 25 mph; to control speed, the dynamic brake is applied. Item Time (MST) H/E Mile Speed (mph) Throttle position TE/DB (kips) DB notch ER (psi) BPP (psi) Air flow (CFM) IND (psi) 11 20:22:53 106.44 21 Idle 0 Setup 90 88 22 0 12 20:23:25 106.25 20 Idle 70 6 90 88 0 0 Table D4. From a speed of 16 mph, and with the dynamic brakes still applied, an initial 9 psi brake pipe reduction is made, followed by a full service application (26 psi), to stop the train’s head-end clear of the Eldon east switch. Item Time (MST) H/E Mile Speed (mph) Throttle position TE/DB (kips) DB notch ER (psi) BPP (psi) Air flow (CFM) IND (psi) 13 20:24:41 105.85 16 Idle 81 7 79 79 0 0 14 20:25:10 105.76 4 Idle 25 8 61 62 0 30 Table D5. With the air brakes released to resume the westward trip, the train starts climbing the 17-mile long ascending grade between Eldon and Stephen; the throttle is progressively increased from notch position 2 to position 8. Item Time (MST) H/E Mile Speed (mph) Throttle position TE/DB (kips) DB notch ER (psi) BPP (psi) Air flow (CFM) IND (psi) 15 20:25:47 105.75 0 T2 0 0 90 82 106 73 16 20:52:52 105.75 0 T3 53 0 89 83 103 18 17 20:26:18 105.75 1 T4 87 0 89 85 79 0 18 20:27:26 105.84 6 T5 76 0 89 88 56 0 19 20:27:54 105.90 9 T6 82 0 89 88 45 0 20 20:28:04 105.93 9 T7 102 0 89 88 41 0 21 20:28:25 105.99 11 T8 108 0 89 88 36 0 22 20:53:48 116.20 21 T8 67 0 89 88 0 0 23 21:17:20 121.50 12 T8 110 0 89 88 0 0
TRANSPORTATION SAFETY BOARD OF CANADA 224 Table D6. The train is approaching the Stephen west signal (1229N); after 52 minutes operating in the throttle 8 position and at a speed of 12 mph, the train’s speed is gradually reduced to 2 mph. Item Time (MST) H/E Mile Speed (mph) Throttle position TE/DB (kips) DB notch ER (psi) BPP (psi) Air flow (CFM) IND (psi) 24 21:20:29 122.15 12 T7 105 0 89 88 0 0 25 21:20:32 122.16 11 T6 94 0 89 88 0 0 26 21:20:36 122.17 10 T5 71 0 89 88 0 0 27 21:20:47 122.20 9 T4 57 0 89 88 0 0 28 21:21:00 122.24 8 T5 54 0 89 88 0 0 29 21:21:17 122.28 9 T6 81 0 89 88 0 0 30 21:21:26 122.31 12 T7 103 0 89 88 0 0 31 21:22:38 122.52 12 T5 84 0 89 88 0 0 32 21:22:39 122.52 12 T6 74 0 89 88 0 0 33 21:22:42 122.53 12 T5 69 0 89 88 0 0 34 21:23:20 122.66 12 T3 47 0 89 88 0 0 35 21:23:24 122.67 10 T2 24 0 89 88 0 0 36 21:23:44 122.74 8 T1 10 0 89 88 0 0 37 21:24:07 122.80 5 Idle 0 0 89 88 0 0 38 21:24:37 122.85 2 T1 0 0 89 88 0 0 39 21:25:30 122.91 3 T2 28 0 89 88 0 0 40 21:25:53 122.93 3 T1 16 0 89 88 0 0 Table D7. The throttle is modulated between notch positions 2 and 3 to keep the train moving onto the steeper descending grade starting around Mile 123. Item Time (MST) H/E Mile Speed (mph) Throttle position TE/DB (kips) DB notch ER (psi) BPP (psi) Air flow (CFM) IND (psi) 41 21:25:55 122.93 3 T2 21 0 89 88 0 0 42 21:26:44 122.97 3 T3 46 0 89 88 0 0 43 21:27:44 123.06 7 T2 36 0 89 88 0 0 Table D8. The head-end of the train starts to descend Field Hill. Item Time (MST) H/E Mile Speed (mph) Throttle position TE/DB (kips) DB notch ER (psi) BPP (psi) Air flow (CFM) IND (psi) 44 21:27:49 123.07 7 T3 21 0 89 88 0 0 Table D9. A minimum automatic air brake application (7 psi brake pipe reduction) is made from a speed of about 9 mph to control train speed. This is the first air brake application since departing Eldon. The brake pipe pressure drops to 81 psi. The throttle is decreased to notch position 2. Item Time (MST) H/E Mile Speed (mph) Throttle position TE/DB (kips) DB notch ER (psi) BPP (psi) Air flow (CFM) IND (psi) 45 21:28:13 123.12 8 T3 41 0 84 88 0 0 46 21:28:27 123.15 9 T3 38 0 83 81 0 0 47 21:28:34 123.17 9 T2 29 0 83 81 0 0
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 225 Table D10. About 10 seconds after the air brakes are applied, the air flow increases to 21 CFM Item Time (MST) H/E Mile Speed (mph) Throttle position TE/DB (kips) DB notch ER (psi) BPP (psi) Air flow (CFM) IND (psi) 48 21:28:37 123.18 9 T2 17 0 83 81 21 0 Table D11. The throttle is modulated between notch position 1 and position 3, and the train speed increases to 10 mph; air flow fluctuates between 27 CFM and 32 CFM. Item Time (MST) H/E Mile Speed (mph) Throttle position TE/DB (kips) DB notch ER (psi) BPP (psi) Air flow (CFM) IND (psi) 49 21:28:47 123.20 8 T1 8 0 83 81 27 0 50 21:29:23 123.28 7 T2 11 0 83 81 29 0 51 21:29:39 123.32 6 T3 26 0 83 81 30 0 52 21:30:00 123.36 7 T3 47 0 83 81 32 0 53 21:31:17 123.54 10 T2 23 0 83 81 29 0 54 21:31:33 123.59 10 T1 9 0 83 81 30 0 55 21:31:58 123.66 10 T2 9 0 83 81 28 0 56 21:32:16 123.71 10 T1 9 0 83 81 29 0 Table D12. The train is approaching the Lake O’Hara public crossing at Mile 123.9; the throttle is reduced to idle at Mile 123.75 to manage the train’s speed over the crossing. Item Time (MST) H/E Mile Speed (mph) Throttle position TE/DB (kips) DB notch ER (psi) BPP (psi) Air flow (CFM) IND (psi) 57 21:32:29 123.75 10 Idle 0 0 83 81 32 0 Table D13. The dynamic brakes are applied in preparation for the steeper grade ahead; the air flow increases to 33 CFM just before the Lake O’Hara crossing. Item Time (MST) H/E Mile Speed (mph) Throttle position TE/DB (kips) DB notch ER (psi) BPP (psi) Air flow (CFM) IND (psi) 58 21:32:39 123.78 10 Idle 0 Setup 83 81 33 0 59 21:33:16 123.90 12 Idle 7 1 83 81 32 0 Table D14. As the train approaches Lake Wapta, the dynamic brake level has now been increased to maximum. The brake pipe pressure is further reduced by 2 to 3 psi; air flow briefly drops below 20 CFM, coincident with the brake application, and then increases to 20 CFM shortly after. Item Time (MST) H/E Mile Speed (mph) Throttle position TE/DB (kips) DB notch ER (psi) BPP (psi) Air flow (CFM) IND (psi) 60 21:36:59 124.79 19 Idle 78 8 80 79 0 0 61 21:37:15 124.88 19 Idle 89 8 80 78 20 0
TRANSPORTATION SAFETY BOARD OF CANADA 226 Table D15. As the grade levels out, the dynamic brake application is removed and the throttle is modulated between notch position 1 and position 4. The air flow remains steady around 27 to 29 CFM with the air brakes still applied. Item Time (MST) H/E Mile Speed (mph) Throttle position TE/DB (kips) DB notch ER (psi) BPP (psi) Air flow (CFM) IND (psi) 62 21:38:34 125.24 14 Idle 0 0 80 78 28 0 63 21:38:44 125.28 14 T2 0 0 80 78 28 0 64 21:38:53 125.32 14 T3 12 0 80 78 29 0 65 21:39:09 125.38 13 T2 20 0 80 78 28 0 66 21:39:18 125.42 13 T3 13 0 80 78 27 0 67 21:39:42 125.51 13 T4 31 0 80 78 27 0 Table D16. The throttle is modulated between notch position 1 and position 3; the train speed reduces to 10 mph. Item Time (MST) H/E Mile Speed (mph) Throttle position TE/DB (kips) DB notch ER (psi) BPP (psi) Air flow (CFM) IND (psi) 68 21:39:57 125.56 12 T3 31 0 80 78 28 0 69 21:39:59 125.57 12 T2 19 0 80 78 27 0 70 21:40:29 125.67 11 T1 7 0 80 78 28 0 71 21:40:30 125.68 11 T2 8 0 80 78 28 0 72 21:40:40 125.71 11 T1 8 0 80 78 28 0 73 21:40:59 125.76 10 T2 7 0 80 78 30 0 74 21:41:03 125.77 10 T3 21 0 80 78 30 0 75 21:41:21 125.83 10 T2 26 0 80 78 29 0 76 21:41:25 125.84 10 T1 8 0 80 78 29 0 77 21:41:36 125.87 10 T2 8 0 80 78 29 0 78 21:41:51 125.91 10 T1 9 0 80 78 28 0 Table D17. The throttle is placed in idle to control train speed, and the dynamic brakes set to the DB 6 position until a green signal indication is observed at Partridge east (at signal 1268). The train speed decreases from 10 to 7 mph with only about half of the train length on the 2.0% descending grade. Item Time (MST) H/E Mile Speed (mph) Throttle position TE/DB (kips) DB notch ER (psi) BPP (psi) Air flow (CFM) IND (psi) 79 21:41:59 125.93 10 Idle 0 0 80 78 28 0 80 21:42:08 125.96 10 Idle 0 Setup 80 78 27 0 81 21:42:41 126.05 8 Idle 66 6 80 78 25 0 82 21:45:22 126.34 7 Idle 0 0 79 78 31 0 83 21:45:28 126.36 9 Idle 0 Setup 79 78 30 0
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 227 Table D18. The brake pipe pressure is reduced by an additional 1-2 psi and the dynamic brake is applied. The brake pipe pressure has now been reduced by 12 psi in total. Air flow briefly drops below 20 CFM, coincident with the brake application, and then increases again. The entire train is now on the 2.0% descending grade, and the train speed increases to 15 mph. Item Time (MST) H/E Mile Speed (mph) Throttle position TE/DB (kips) DB notch ER (psi) BPP (psi) Air flow (CFM) IND (psi) 84 21:46.01 126.46 14 Idle 39 3 77 76 0 0 85 21:46:29 126.58 15 Idle 90 8 78 76 20 0 Table D19. In preparation for the train moving onto the steeper 2.2% descending grade, the brake pipe pressure is progressively reduced, initially by 1-3 psi, with a further reduction of 2-3 psi some 36 seconds later, and then after an additional 34 seconds, the total reduction reaches 19 psi. During this time, in spite of the brake pipe pressure reductions, the train speed increases from 16 to 22 mph (maximum allowed is 20 mph). Air flow is reduced and remains below 20 CFM (and is displayed as 0 CFM), coincident with the increased brake application. The initial increase in locomotive brake cylinder pressure at 2147:48 indicates the LE had started to move the emergency brake valve handle toward the emergency position in compliance with the Field Hill maximum speed threshold policy when the train speed reached 21 mph. The brakes were applied in emergency at 2148:08 and the distributed power (DP) radio command was received at the DP mid-train remote locomotive at 2148:10. Item Time (MST) H/E Mile Speed (mph) Throttle position TE/DB (kips) DB notch ER (psi) BPP (psi) Air flow (CFM) IND (psi) 86 21:46:46 126.66 16 Idle 91 8 75 74 0 0 87 21:47:19 126.82 19 Idle 83 8 73 72 0 0 88 21:47:48 126.98 21 Idle 86 8 70 70 0 1 89 21:48:05 127.09 22 Idle 37 8 69 68 0 61 90 21:48:10 127.12 22 Idle 14 0 68 33 0 60 Table D20. The speed reaches 23 mph as the emergency brake application propagates along the brake pipe. The train continually slows down during the next 82 seconds and comes to a complete stop at 2149:33. Item Time (MST) H/E Mile Speed (mph) Throttle position TE/DB (kips) DB notch ER (psi) BPP (psi) Air flow (CFM) IND (psi) 91 21:48:11 127.13 23 Idle 0 0 62 3 0 51 92 21:48:12 127.13 23 Idle 0 0 57 0 0 48 93 21:49:33 127.46 0 Idle 0 0 0 0 0 44
TRANSPORTATION SAFETY BOARD OF CANADA 228 Appendix E – Mechanical testing and human factors assessment of train securement using hand brakes Although hand brakes were not applied on the occurrence train, in support of this investigation, the Operational Services Branch of the TSB conducted mechanical testing and a human factors assessment of issues related to hand brake securement of freight trains on mountain grades. The objective was to determine how many hand brakes would have been needed to hold the train stationary on Field Hill, and whether it would have been possible for a lone conductor to apply on average sufficient torque to the required hand brakes to ensure that the train had the retarding force necessary to remain stationary. Regulatory requirements regarding the number of hand brakes to apply on a train As part of the study, the TSB reviewed regulatory requirements dictating the number of hand brakes to apply on a train in various situations. Canadian Rail Operating Rules, Rule 112: Securing Unattended Equipment CROR Rule 112 covers the securement requirements for unattended equipment. Because the occurrence train was not left unattended, Rule 112 did not apply. However, a review of this rule still provides valuable information for the purpose of this study, as it lists the minimum number of hand brakes that need to be applied on various grades and for different train weights when trains are unattended. Given the occurrence train’s weight of approximately 15 000 tons and the average 2.2% descending grade, had the train been left unattended, a minimum of 98 hand brakes would have been needed to secure it, according to the chart in CROR Rule 112 (g).211 Transport Canada Ministerial Order 19-03 Following this derailment, Transport Canada issued Ministerial Order MO 19-03 requiring train crews to immediately secure their trains with a pre-determined number of hand brakes (based on train tonnage and descending grade) following an emergency stop on mountain grades. To meet the requirements of this Ministerial Order on the occurrence train, given the train tonnage and grade, it would have been necessary to apply hand brakes on 98 cars after the train was stopped in emergency on Field Hill. Canadian Rail Operating Rules, Rule 66: Securing Equipment after an Emergency Brake Application on Grade On 24 April 2020, the Minister of Transport approved CROR Rule 66, which covers the securement requirements after an emergency brake application on grade. This rule came into force on 24 June 2020 and replaced MO 19-03.
211 Transport Canada, Canadian Rail Operating Rules (18 May 2018), Rule 112: Securing Unattended Equipment, p. 46.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 229 Given the occurrence train’s tonnage and the mountain grade, to meet the requirements of Rule 66, it would have been necessary to apply 75 hand brakes on the occurrence train after it stopped in emergency, which is 23 hand brakes less than the number required by CROR Rule 112. Mechanical testing of the hand brakes on the recovered cars The TSB performed mechanical testing on the 13 grain cars recovered from the occurrence site to determine the performance and efficiency of their hand brakes. The 13 cars represented 4 different car builders and ranged from 3 to 43 years of service. The mechanical testing was conducted at a Canadian Pacific car shop in Port Coquitlam, British Columbia. The testing used various calibrated apparatus to measure the input torque and output forces involved, and followed a thorough test plan which covered various brake application scenarios. Hand brake effectiveness on steep grades CROR Rule 112 identifies the manner in which “hand brake effectiveness” must be tested. Item (vi) of the Rule states the following: (vi) Testing Hand Brake Effectiveness When testing the effectiveness of hand brakes, ensure all air brakes are released and:
(a) Allow the slack to adjust. It must be apparent when slack runs in or out, that the hand brakes are sufficient to prevent the equipment from moving; or
(b) Apply sufficient tractive effort to determine that the hand brakes prevent the equipment from moving when tractive effort is terminated.212 On steep grades, such as where the occurrence train was stopped, it would not be possible to release all the air brakes to test for applied hand brake effectiveness. Therefore, when trains are stopped in emergency on steep grades, they are secured by applying the pre- determined number of hand brakes on top of the emergency brake application. In such conditions, generating a sufficient amount of retarding force to hold a train stationary depends on the applied hand brake force and on the amount of brake cylinder pressure (BCP) that is produced due to applying the train brakes in emergency. The hand brake testing on the 13 recovered cars attempted to evaluate the net braking force that would have resulted from the combination of hand brakes and emergency air brakes on the occurrence train. Hand brake net braking ratio Grain hopper cars are equipped with a 22-inch diameter vertical hand-wheel-activated hand brake. These hand brakes are required by the AAR to generate a net braking ratio
212 Ibid., p. 43.
TRANSPORTATION SAFETY BOARD OF CANADA 230 (NBR) greater than, or equal to, 10% of the gross weight of the loaded car at the time of manufacture. The AAR design specification also states that service wear should not result in the hand brake NBR being reduced below 6.5% on a rail car.213 The hand brake NBR is determined by dividing the sum of the generated brake shoe force at each hand brake wheel by the gross weight of the car, based on a force of 125 pounds applied at the hand brake wheel (115 foot-pounds of torque). The hand brake is required to generate the minimum NBR at a chain force of 3350 pounds.214 Testing objectives The testing performed on the recovered cars consisted of baseline tests and tests simulating the conditions of the hand brakes applied over an emergency brake application. Baseline tests were conducted with 2 primary objectives: • to verify that the hand brake on each car met the minimum NBR per design requirements, and • to determine, for a range of input torques on the hand brake wheel, the relationship between the input torque and the braking ratio. Tests were then performed on the cars with their brakes applied in emergency. The primary objective of these tests was to examine hand brake retention as the air pressure in the brake cylinder decreased from a full emergency application to zero. Test conclusions Testing could not be performed on 2 of the 13 cars due to excessive brake beam rotation causing damage to the load sensors. Four of the remaining 11 cars failed to meet the 6.5% minimum NBR design criterion given by the AAR, even at maximum torque value of 110 foot-pounds. When the brake cylinders had leaked from an emergency application pressure to 25 psi, cars required at least 30 foot-pounds of torque to achieve a minimum NBR of 6.5%. With only 10 psi BCP (minimum brake application), the cars required 75 foot-pounds or greater of input torque to the hand brake wheel to achieve an NBR of 6.5%. If the hand brakes on the cars generated only the required design minimum NBR of 6.5%, as many as 111 hand brakes may have been needed to secure the occurrence consist (112 cars) on this grade, depending on the coefficient of friction (COF) of the brake shoes. For an average value of 55 foot-pounds of torque at the hand brake wheel (average value of field tests conducted by the TSB), securing the occurrence train on the 2.2% grade would have required a minimum BCP of 10 psi as well as 73 to 102 hand brakes applied (depending on the COF of the brake shoes, which ranged from 0.3 to 0.4).
213 Association of American Railroads (AAR), Manual of Standards and Recommended Practices (2018), Section E: Brake Design Requirements S-401, Paragraph 4.1. 214 Ibid.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 231 For an average BCP of 25 psi on the freight cars, which is considered low (emergency BCP is 77 psi for a fully charged car with no leakage), the train would remain stationary with 48 to 67 hand brakes, depending on the COF of the brake shoes, which ranged from 0.3 to 0.4. Table E1 shows how many hand brakes would be needed to hold the 15 000-ton occurrence train on the 2.2% descending grade of Field Hill, assuming 55 foot-pounds input torque, and a coefficient of friction in the range of 0.3 to 0.4. In the presence of brake cylinder leakage, an increasingly higher number of hand brakes would be needed as the pressure drops. Table E1. Number of hand brakes required at an input torque of 55 foot-pounds to hold the 15 000-ton occurrence train on the 2.2% descending grade of Field Hill, based on the coefficient of friction of the brake shoes and the average brake cylinder pressure* Coefficient of friction Number of hand brakes required based on average brake cylinder pressure 77 psi** 65 psi 50 psi 35 psi 25 psi 10 psi 0 psi 0.30 42 40 46 55 67 102 162 0.31 40 39 44 53 64 98 156 0.32 39 37 43 51 62 95 151 0.33 37 36 41 50 60 92 146 0.34 36 35 40 48 58 88 141 0.35 35 34 38 46 56 86 136 0.36 34 33 37 45 54 83 132 0.37 33 32 36 44 52 80 128 0.38 32 31 35 42 51 78 124 0.39 31 30 34 41 49 75 120 0.40 30 29 33 40 48 73 116 * The numbers in this table assume a net hand brake ratio of 6.5%. ** A brake cylinder pressure of 77 psi corresponds to the pressure after an emergency brake application, when there is no brake cylinder leakage. For an average hand brake torque value of 75 foot-pounds, the occurrence train would not need any additional BCP to hold it on the grade if between 112 and 83 hand brakes were applied (depending on the COF of the brake shoes, which ranged from 0.3 to 0.4) Human performance assessment of the task of applying hand brakes Ministerial Order MO 19-03 raised the possibility that hand brakes would be mandatory in more situations. It was important therefore during the hand brake testing to benchmark the modified single-conductor hand brake application task from a human performance perspective. The primary objective of the human performance assessment of applying hand brakes was to predict the magnitude of retarding forces that could be generated by train crews to secure a heavy train stopped on a grade in operating conditions similar to that of the occurrence. The objectives were to • quantify the average torque an operator can apply for a high number of hand brake applications;
TRANSPORTATION SAFETY BOARD OF CANADA 232 • quantify the assumed degradation of torque applied along approximately 100 grain cars and the time required to complete the task; and • analyze whether a lone conductor could secure a train effectively using hand brakes alone. The testing was organized as an independent assessment during summer temperatures on level grade, reflecting ideal environmental conditions for participants. Operating on mountain grade in winter conditions with winter personal protective equipment would greatly increase the difficulty level of applying hand brakes. The testing was performed on a cut of 115 grain cars. The cars were from several different manufacturers and had representation from a range of build dates. The cut of cars was located along a length of track with road access on each end and bordered on either side by farmland in Coalhurst, Alberta. Seven participants (5 male and 2 female) of varying stature applied hand brakes to the first 100 cars. Half of the cars had BCP that replicated the condition of an emergency brake application, and the other half replicated the condition of cars with no air brake application. For safety, the remaining 15 cars were marked out of bounds and had their hand brake applied as an anchor for the entire cut. The National Aeronautics and Space Administration (NASA) task load index (TLX) tool was used to collect and interpret participants’ subjective workload215 ratings in completing the task, targeting variables thought to influence efficiency (i.e., anthropometric variation, physical effort, cognitive workload, and individual technique). The following assessments were done for each of the test participants: • time required to complete the task • torque values applied and average torque value for all 100 cars • endurance evaluations • movement along pathway, entraining and detraining times • post-activity feedback The time, effort, and performance of each participant was recorded during and after each individual assessment. Various anthropometric measurements were collected and a workload questionnaire administered to compare participants’ effort and physical condition before, during, and after the task. The effects of car design and condition on participant performance were also recorded. The results from these assessments are summarized below. • The average time required to board a car and apply a single hand brake was 40.2 seconds. • The average time required to apply 100 hand brakes was 2 hours and 5 minutes. • The average achievable input torque over 100 hand brakes was 55 foot-pounds.
215 Defined as the amount of effort people have to exert both mentally and physically to interact with an interface.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 233 • The current hand brake design requires an input torque of 75 to 103 foot-pounds, depending on the COF, to secure the occurrence train with 84 hand brakes. • Variations in workstation design (e.g., boarding ladders, grab irons) at the hand brake interface increased the difficulty of the task. • The design of the hand brake wheel caused superficial injury to participants’ hands even though they wore 2 pairs of work gloves. • The average NASA TLX subjective workload score was 51/100, which is a moderate level of effort considering the physical and cognitive demands placed on the participants. • Safe and effective successive application of 100 hand brakes would be unlikely for a person with reduced physical fitness (i.e., poor cardiovascular endurance and/or reduced musculoskeletal strength). Brake stick As an addendum to the human performance assessment, a brake stick was briefly trialled to determine its effectiveness. A brake stick is a hand brake application and release tool used by some of the major American railways, including Norfolk Southern Railroad and Union Pacific Railroad. It is an extendable stick with a hook on one end and a handle on the other designed to engage with the spokes on the hand brake wheel (figures E1 and E2).
TRANSPORTATION SAFETY BOARD OF CANADA 234 Figure E1. Brake stick (Source: TSB) Figure E2. Conductor using a brake stick to apply a hand brake from the ground (Source: Aldon Company, Inc.)
The limited-scope assessment did not formally assess the effectiveness of a brake stick to apply hand brakes; however, anecdotal observations indicate that such a device could greatly increase efficiency (i.e., reduce time and effort) of the task with a potential doubling of torque input. Conclusions from the study It would not have been possible for the average participant in this study to have secured the occurrence train on the mountain grade using hand brakes alone given the design and condition of the equipment provided.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 235 Based on the average input torque of 55 foot-pounds seen in this study, between 116 and 162 hand brakes, depending on the COF of the brake shoes, would have been required to hold the 112-car occurrence train on the 2.2% grade. Instead of setting retainers, applying 84 hand brakes at the average input torque of 55 foot- pounds would not have secured the train with the air brakes released, but would have slowed its descent rate. The current hand brake design would require an input torque of 75 to 103 foot-pounds, depending on the COF of the brake shoes, for the occurrence train if 84 hand brakes had been applied. This input torque is higher than what the average participant could provide during the testing.
TRANSPORTATION SAFETY BOARD OF CANADA 236 Appendix F – Association of American Railroads Circular Letter C-12027 and New York Air Brake General Letter GL-490
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 237
TRANSPORTATION SAFETY BOARD OF CANADA 238
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 239
TRANSPORTATION SAFETY BOARD OF CANADA 240 Appendix G – Canadian Pacific bulletin CPSB048-13
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 241 Appendix H – TSB investigations involving crew resource management at railway companies R17W0267 – On 22 December 2017, a Canadian National Railway Company (CN) foreman and a helper were performing switching operations at CN’s Melville Yard in Melville, Saskatchewan. The foreman was operating extra yard assignment Y1XS-01 using a remote control locomotive system (RCLS) when the foreman became pinned between the assignment and the lead car of an uncontrolled movement while applying a hand brake. The foreman received fatal injuries. There was no derailment and no dangerous goods were involved. In this occurrence, although the foreman and helper held 2 job briefings, several elements of the plan were not effectively communicated and/or coordinated. If crew members do not receive enhanced crew resource management training to develop skills in crew coordination and communication, there is an increased risk that inadequate crew communication will lead to unsafe operations. R16E0051 – On 04 June 2016, CN train 112 was proceeding eastward on the Edson Subdivision when it collided at 18 mph with the tail end of CN train 302, which was stopped near Carvel, Alberta. No cars derailed as a result of the collision. There was minor damage to 1 empty hopper car on train 302. The investigation determined that the conductor, who was also a qualified locomotive engineer (LE) but with less experience than the occurrence LE, did not initially question the LE on the speed of the train while operating past the restricting signal.216 In addition, the conductor did not further question the LE after it was decided not to report the collision. If operating employees are not trained in crew resource management, including how to make decisions when authority gradients are present, crew coordination and interaction may not be effective, increasing the risk of human factors– related accidents. R07E0129 – On 27 October 2007, westbound CN train 417 was unable to stop prior to passing a stop signal near Peers, Alberta, on the Edson Subdivision and collided with eastbound CN train 342, which was entering the siding. Train 417’s locomotives and 22 cars derailed. Five cars on train 342 derailed. The investigation determined that the conductor had deferred to the LE’s experience and did not challenge his actions. It was also stated that, in the absence of procedures that recognize the risks inherent in an authority gradient, intra-cab communication can fail. R98V0148 – On 11 August 1998, CP train 463 collided with the rear end of CP train 839 at Mile 78.0 of the Shuswap Subdivision, near Notch Hill, British Columbia. One car on train 463 and 2 cars on train 839 derailed. The investigation determined that neither the conductor nor the LE challenged each other’s identification of signals; the authority gradient between the 2 crew members probably prevented the conductor from challenging the LE and expressing his concerns.
216 Transport Canada, Canadian Rail Operating Rules, Rule 436, states "Restricting - Proceed at RESTRICTED speed." Restricted speed is defined as "[a] speed that will permit stopping within one-half the range of vision of equipment, also prepared to stop short of a switch not properly lined and in no case exceeding SLOW speed. When moving at RESTRICTED speed, be on the lookout for broken rails." Slow speed is defined as "[a] speed not exceeding 15 miles per hour."
TRANSPORTATION SAFETY BOARD OF CANADA 242 R96Q0050 – On 14 July 1996, Quebec North Shore and Labrador Railway (QNS&L) train FCS 45 collided with the tail end of stationary QNS&L train PH-475 at Mile 131.68 of the Wacouna Subdivision near Mai, Quebec. The last 3 cars of the stationary train derailed. The locomotive of the moving train was extensively damaged. The LE of the moving train sustained minor injuries. The investigation determined that at the time, there was no established crew resource management program in use on the railway that would ensure that all persons involved were aware of the most up-to-date, accurate information concerning the movement of trains and engines.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 243 Appendix I − TSB investigations related to hazard identification, data trend analysis, and risk assessments at Canadian Pacific R19C0002 – On 06 January 2019, at approximately 0655 Mountain Standard Time, the crew of Canadian Pacific Railway Company (CP) yard assignment CW11-06 was switching cars eastward into the classification tracks at Alyth C-Yard in Calgary, Alberta, when 56 cars disconnected from the movement and ran uncontrolled down the lead track into the designated emergency track, contacting a cut of stationary loaded hopper cars. As a result of the collision, a total of 22 cars derailed. Alyth C-Yard, which had previously been used as a hump yard, was deactivated in 2013 and re-opened on 22 December 2018 as a flat switching yard. Although a risk assessment had been performed in anticipation of the operational change, a series of uncontrolled movements occurred in the first 16 days of operation, indicating that either some of the hazards that existed were not identified, or the applied risk mitigation strategies were inadequate. When an operational change takes place and the preceding risk assessment does not identify certain hazards, the associated risks may not be adequately mitigated, resulting in an increased potential for accidents. R18H0039 – On 14 April 2018, at about 0215 Eastern Daylight Time, a CP yard foreman and a CP yard helper were performing switching operations at CP’s Toronto Yard in Toronto, Ontario, using a remote control locomotive system (RCLS). The yard foreman was operating yard assignment T16-13 when it began to roll uncontrolled eastward on the Staines connecting track. There was no derailment or collision, and there were no injuries. Because the majority of switching was taking place at the west end of the yard, the installation of derails was recommended for the west end of the yard to protect the main track from uncontrolled movements. When CP increased the amount of yard shifts working at any given time to 2 in February 2018, the second yard shift worked primarily at the east end of the yard. CP did not consider the addition of yard crews as a change to its operations, even though the second crew would be working primarily in the east end of the yard where no derails were installed. Consequently, a new risk assessment was not performed. Therefore, the opportunity to identify new hazards caused by the addition of the second crew working on the east end of the yard was missed. R17D0123 – On 08 November 2017, CP yard assignment FS23 was performing switching operations in St-Luc Yard at Mile 46.9 of the CP Adirondack Subdivision, in Montréal, Quebec. At about 0600 Eastern Standard Time, while reversing southward in the dark at approximately 10 mph, the yard assignment struck and fatally injured the yard helper. When the classification yard was closed in 2012, most of the switching operations at St-Luc Yard were moved to a section of the yard referred to as the “diamond” area, which had a significantly different configuration than the classification yard. Given the differences between the configuration of the classification yard and the diamond area, a task analysis of the yard helper and yard foreman roles for the diamond area would have been appropriate. A task analysis could have identified the differences between the release zones, the risk of being foul of the tracks when releasing cars or turning switches, the presence of tripping hazards, and a reduction in the level of ambient lighting. Thus, mitigating measures such as
TRANSPORTATION SAFETY BOARD OF CANADA 244 increased lighting, improved walking conditions, the identification of switches and their targets, and the modification of the switching leads and release zones could have been identified, reducing the risks to employees becoming foul of a track while performing switching operations. Because CP did not consider the closing of the St-Luc classification yard to be a significant change to railway operations at St-Luc, no risk assessment was performed in 2012. Therefore, the opportunity to identify new hazards created by the change to switching at St-Luc Yard was missed. R16C0065 – On 03 September 2016, at about 0925 Mountain Daylight Time, CP train 303-646, proceeding westward at approximately 22 mph at Mile 171.7 of the Brooks Subdivision, collided with the tail end of train 113-31, which was stopped on Track PT01, near Alyth Yard in Calgary, Alberta. Two locomotives on the head end of train 303-646 derailed, as did 2 covered hopper cars behind the locomotives. The last car on train 113-31, a 3-platform container car, also derailed. There were no injuries. No dangerous goods were released. In June 2013, following the collapse of the Bonnybrook Bridge, CP had changed the designation of Track PT01 between Ogden and the begin/end interlocking limits at 12th Street East from main-track centralized traffic control (CTC) to non-main track. However, when rail traffic over the bridge resumed, CP did not put CTC back in service at this location. When it was decided to keep this section of track designated as non-main track, no risk assessment was conducted, nor was one required at that time. Without a risk assessment, the railway was not specifically aware of the hazards and safety concerns of train crews when operating through this location. Therefore, no specific action had been taken by the railway to mitigate the potential hazards. The investigation determined that, if risk assessments are not conducted for changes to railway operations, potential hazards associated with the operational change may not be identified and appropriately mitigated, increasing the risk of accidents. R16W0074 – On 27 March 2016, at about 0235 Central Standard Time, while switching in Sutherland Yard in Saskatoon, Saskatchewan, CP 2300 remote control locomotive system training yard assignment was shoving a cut of cars into Track F6. As the assignment was brought to a stop, empty covered hopper car EFCX 604991 uncoupled from the train, unnoticed by the crew. The car rolled uncontrolled through the yard and onto the main track within cautionary limits of the Sutherland Subdivision. The car travelled about 1 mile and over 2 public automated crossings before coming to a stop on its own. There were no injuries and no derailment. No dangerous goods were involved. In early 2016, several operational changes were implemented by CP at Sutherland Yard. The operational changes prompted CP to complete a combined risk assessment in accordance with the Railway Safety Management System Regulations, 2015. While the risk assessment covered RCLS operations and the introduction of a point protection zone, it did not consider the impact of reducing the number of train crews or the change in local practice to primarily switching without air. It also did not specifically identify potential hazards related to crew inexperience or an uncontrolled movement.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 245 Therefore, remedial action to address a potential uncontrolled movement, such as the installation of a derail, was not considered or implemented to protect against uncontrolled movements while switching without air. R16H0024 – On 06 March 2016, at approximately 1540 Eastern Standard Time, CP freight train 100-03 was proceeding eastward at about 35 mph when it collided with a stationary hi-rail vehicle at Mile 118.36. The foreman and machine operator had exited the hi-rail vehicle just before the collision. As part of its SMS, CP collects and analyses safety data to identify emerging trends, including recurring situations where safety is compromised. In this occurrence, there was no indication that CP had specifically identified the upward trend of track units being operated outside their limits of authority, although CP had initiated work on its Employee in Charge system (a system designed to mitigate safety risks during track unit operation). If railway safety data are not regularly reviewed to identify trends, emerging trends or recurring situations, and appropriate action is not taken, safety risks may remain unidentified and unmitigated, increasing the risk of accidents.
TRANSPORTATION SAFETY BOARD OF CANADA 246 Appendix J – Golder Associates audit of Canadian Pacific’s safety management system (CP internal audit) Under sections 30, 31, and 32 of the Railway Safety Management System Regulations, 2015, railway companies must conduct an audit of their safety management system (SMS) every 3 years and produce a safety action plan to address identified deficiencies. In 2017, Canadian Pacific Railway Company (CP) contracted Golder Associates Limited to audit its SMS, and Golder delivered its findings on 17 July 2017. Golder categorized its findings as major non-conformances (MA), minor non-conformances (MI) and opportunities for improvement (OFI). The findings were also assessed for urgency using the following classification: • High Priority (HI) – A high-priority finding is one that meets one or more of the following criteria:
• Presents an imminent or escalating risk of significant health, safety, regulatory or reputational impact;
• Is potentially non-compliant with a regulatory requirement;
• Requires an unusual or significant allocation of effort, capital works, resources and / or time to rectify;
• Must be addressed on a priority basis to enable the basic functioning of other elements of the SMS. • Moderate Priority (MO) – A moderate-priority finding is one that meets one or more of the following criteria:
• Will not result in significant health, safety, regulatory or reputational impact;
• Can be corrected over time without risk of escalation or increasing severity;
• Can be corrected within the usual Continual Improvement cycle of the SMS (e.g.: in an Annual Management Review process). • Low Priority (LO) – A low-priority finding is one that meets one or more
of the following criteria:
• Has no directly associated risk of health, safety, regulatory or reputational impact;
• Does not impede the functionality of any other element of the SMS; and
• Can be corrected within the effort required for the regular ongoing maintenance of the SMS.217 Tables J1 and J2 present some of the findings and opportunities for improvement identified by this audit that are relevant to this occurrence.
217 Golder Associates Limited, Canadian Pacific Safety Management System Audit (17 July 2017), Section 9.1.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 247 Table J1. Select non-conformance findings from the 2017 audit of Canadian Pacific’s safety management system (Source: Golder Associates Limited) Finding No. Priority Finding statement MI-12-1 MO There appears to be an inconsistent level of investigation and analysis into incidents, including railway occurrences. MI-12-1 MO The effectiveness of workplace and safety committee inspections in some areas is not sufficient to verify or maintain compliance with legal requirements. MI-13-2 MO Variability in the current practices for safety hazard reporting results in an incomplete or biased data set for trend analysis of safety concerns. MI-13-3 MO Information from safety committee inspections and locally-managed Safety Hazard Reports is not evaluated for system-wide trends and safety concerns. MI-24-1 MO Reporting tools described in the reporting procedures are not well known and/or inconsistently used. MI-26-1 MO Some instances of lapsed mandatory refresher training requirements were reported. MI-27-1 MO Version control verification measures are lacking for some key operational safety documents. MI-9-1 LO Out-of-date safety policy posters were posted on bulletin boards and elsewhere in the workplace at Toronto and Coquitlam yards. MI-20-1 LO It is not clear how the current process for evaluating the effectiveness of remedial action involves the bargaining units. MI-25-1 LO Employees involved in activities that may affect railway safety do not always have appropriate training. MI-29-1 LO SMS procedure documents should be reviewed to ensure that the next scheduled review dates are accurate. Table J2. Select opportunities for improvement of moderate priority identified in the 2017 audit of Canadian Pacific’s safety management system (Source: Golder and Associates) Finding No. Priority Finding statement OFI-12-1 MO Incident reports contained in the Incident Manager (IM) system do not include the information reported to the TSB during the initial report. OFI-12-2 MO The Initial Incident Report form is not referenced in the CP procedure with respect to incident reporting. OFI-12-3 MO There are inconsistencies in CP procedures and TSB Regulations with respect to definition of a railway occurrence. OFI-13-1 MO Job aids that are used to help identify and control operational/occupational safety risks are not always complete. OFI-13-2 MO Communication back to employees who have raised concerns is not always conducted in a prompt or effective manner. OFI-13-3 MO There is an opportunity to further enhance operational safety information sharing between CP and its contractors. OFI-13-4 MO There is an opportunity to enhance the information management tools, consistent with the operational criticality of the data. OFI-15-1 MO There is an opportunity to conduct additional risk assessments where they could provide value or update understandings of relevant risk mitigation strategies.
TRANSPORTATION SAFETY BOARD OF CANADA 248 Finding No. Priority Finding statement OFI-17-1 MO Inconsistency was noted between risk assessments in the methods used to estimate likelihood. OFI-21-1 MO Current targets are only measured with lagging indicators, although several leading indicators are available. OFI-25-1 MO Instances were observed of a lack of clarity in the presentation and understanding of safety rules and requirements. OFI-25-2 MO The management of change process, as it relates to changes in operating procedures and instructions, is inconsistent between departments. OFI-25-3 MO There is no consistent way to confirm and demonstrate that communications on changes to rules have been received by individual employees. OFI-26-1 MO There is inconsistency in the performance of e-tests, with regard to the recording of results, the failure rates, and the assignment of pass / fail grades. OFI-27-1 MO Instances of incomplete communication with workers/employees during efficiency/proficiency testing were reported. OFI-27-2 MO Concerns were expressed regarding the competency of auditors during execution of efficiency/proficiency tests. OFI-28-1 MO While the principles of fatigue science stipulated in the SMS Regulations are considered in the scheduling model used by CP, the model does not consider other factors that may also contribute to fatigue.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 249 Appendix K – TSB investigations involving uncontrolled movements Occurrence number Date Description Location Cause R19C0015 (this occurrence) 2019-02-04 Uncontrolled movement of rolling stock and main-track train derailment, Canadian Pacific Railway Company, freight train 301-349, Mile 130.6, Laggan Subdivision Yoho, British Columbia Loss of control R18M0037 2018-12-04 Employee fatality, Canadian National Railway Company, yard assignment L57211-04, Mile 1.03, Pelletier Subdivision Edmundston, New Brunswick Insufficient securement R18Q0046 2018-05-01 Non-main-track uncontrolled movement and derailment of rolling stock, Quebec North Shore and Labrador Railway, cut of cars Sept-Îles, Quebec Switching without air R18H0039 2018-04-14 Uncontrolled movement of rolling stock, Canadian Pacific Railway Company, locomotive remote control system yard assignment T16- 13, Mile 195.5, Belleville Subdivision Toronto, Ontario Loss of control R18E0007 2018-01-10 Uncontrolled movement of rolling stock, Canadian National Railway Company, freight train L76951-10, Mile 0.5, Luscar Industrial Spur Leyland, Alberta Loss of control R17W0267 2017-12-22 Employee fatality, Canadian National Railway Company, extra yard assignment Y1XS-01 Melville, Saskatchewan Switching without air R17V0096 2017-04-20 Non-main-track uncontrolled movement, collision, and derailment, Englewood Railway, Western Forest Products Inc., cut of cars Woss, British Columbia Switching without air R16W0242 2016-11-29 Uncontrolled movement, collision, and derailment, Canadian Pacific Railway Company, ballast train BAL- 27 and freight train 293-28, Mile 138.70, Weyburn Subdivision Estevan, Saskatchewan Loss of control R16T0111 2016-06-17 Uncontrolled movement of railway equipment, Canadian National Railway Company, remote control locomotive system 2100 west industrial yard assignment, Mile 23.9, York Subdivision, MacMillan Yard Vaughan, Ontario Loss of control R16W0074 2016-03-27 Uncontrolled movement of railway equipment, Canadian Pacific Railway Company, remote control locomotive system 2300 training yard assignment, Mile 109.7, Sutherland Subdivision Saskatoon, Saskatchewan Switching without air
TRANSPORTATION SAFETY BOARD OF CANADA 250 Occurrence number Date Description Location Cause R16W0059 2016-03-01 Uncontrolled movement of railway equipment, Cando Rail Services, 2200 Co-op Refinery Complex assignment, Mile 91.10, Quappelle Subdivision Regina, Saskatchewan Insufficient securement R15D0103 2015-10-29 Runaway and derailment of cars on non-main track, Canadian Pacific Railway Company, stored cut of cars, Mile 2.24, Outremont Spur Montréal, Quebec Insufficient securement R15T0173 2015-07-29 Non–main-track runaway, collision, and derailment, Canadian National Railway Company, cut of cars and train A42241-29, Mile 0.0, Halton Subdivision Concord, Ontario Switching without air R13D0054 2013-07-06 Runaway and main-track derailment, Montreal, Maine & Atlantic Railway, freight train MMA-002, Mile 0.23, Sherbrooke Subdivision Lac-Mégantic, Quebec Insufficient securement R12E0004 2012-01-18 Main-track collision, Canadian National Railway Company, runaway rolling stock and train A45951-16, Mile 44.5, Grande Cache Subdivision Hanlon, Alberta Insufficient securement R11Q0056 2011-12-11 Runaway train, Quebec North Shore and Labrador Railway, freight train LIM-55, Mile 67.20, Wacouna Subdivision Dorée, Quebec Loss of control R09D0053 2009-09-09 Non–main-track collision, VIA Rail Canada Inc., locomotive 6425, Montréal Maintenance Centre Montréal, Quebec Switching without air R09T0057 2009-02-11 Runaway and non–main-track train derailment, Southern Ontario Railway, 0900 Hagersville Switcher, Mile 0.10 and Mile 1.9 of the Hydro Spur Nanticoke, Ontario Insufficient securement R08V0270 2008-12-29 Non–main-track train runaway and collision, Kettle Falls International Railway, Waneta Turn Assignment, Mile 141.20, Kettle Falls Subdivision Waneta, British Columbia Loss of control R07H0015 2007-07-04 Runaway rolling stock, Canadian Pacific Railway Company, runaway cut of cars, Mile 119.5, Winchester Subdivision Smiths Falls, Ontario Insufficient securement R07V0109 2007-04-23 Non-main-track train derailment, Kootenay Valley Railway, 0700 Trail yard assignment, Mile 19.0, Rossland Subdivision Trail, British Columbia Loss of control R06V0183 2006-09-03 Runaway and derailment, White Pass and Yukon Railway, work train 114, Mile 36.5, Canadian Subdivision Log Cabin, British Columbia Loss of control
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 251 Occurrence number Date Description Location Cause R06V0136 2006-06-29 Runaway and derailment, Canadian National Railway Company, freight train L-567-51-29, Mile 184.8, Lillooet Subdivision Lillooet, British Columbia Loss of control R05H0011 2005-05-02 Runaway and main-track train collision, Ottawa Central Railway, freight train 441, Mile 34.69, Alexandria Subdivision Maxville, Ontario Insufficient securement R04V0100 2004-07-08 Uncontrolled movement of railway rolling stock, Canadian National Railway Company, train M-359-51- 07, Mile 57.7, Fraser Subdivision Bend, British Columbia Loss of control R03T0026 2003-01-21 Yard collision, Canadian Pacific Railway Company, car HOKX 111044, Mile 197.0, Belleville Subdivision, Toronto Yard Agincourt, Ontario Switching without air R03T0047 2003-01-22 Yard collision, Canadian National Railway Company, tank car PROX 77811, Mile 25.0, York Subdivision Toronto, Ontario Switching without air R99D0159 1999-08-27 Runaway cars, Canadian National Railway Company, Mile 69.4, Kingston Subdivision, Wesco Spur Cornwall, Ontario Insufficient securement R98M0029 1998-09-24 Main-track runaway, collision, and derailment, Matapédia Railway, Canadian National Railway Company train A402-21-24, Mile 105.4, Mont- Joli Subdivision Mont-Joli, Quebec Insufficient securement R98M0020 1998-07-31 Main-track runaway and collision, VIA Rail Canada Inc., passenger train 14 and uncontrolled five-pak movement, Mile 105.7, Matapédia Railway Mont-Joli Subdivision Mont-Joli, Quebec Insufficient securement R97C0147 1997-12-02 Runaway and derailment, Canadian Pacific Railway Company, train 353- 946, Laggan Subdivision Field, British Columbia Loss of control R96C0172 1996-08-12 Main-track collision, Canadian National Railway Company, train 117 and uncontrolled movement of 20 cars, Mile 122.9, Edson Subdivision Near Edson, Alberta Insufficient securement R96C0209 1996-10-09 Runaway cars, Canadian Pacific Railway Company, CP 0700 yard assignment, Mile 166.2, Willingdon Subdivision, Clover Bar exchange track Edmonton, Alberta Insufficient securement R96T0137 1996-04-24 Runaway of 5 tank cars, Canadian National Railway Company, Mile 0.0, Hagersville Subdivision Nanticoke, Ontario Insufficient securement
TRANSPORTATION SAFETY BOARD OF CANADA 252 Occurrence number Date Description Location Cause R96C0086 1996-04-13 Runaway train, Canadian Pacific Railway Company, freight train 607- 042, Mile 133.0, Laggan Subdivision Field, British Columbia Loss of control R95M0072 1995-12-14 Runaway cars, Canadian National Railway Company, train 130-13, Mile 0.0, Pelletier Subdivision Edmundston, New Brunswick Insufficient securement R94V0006 1994-01-18 Runaway train, Canadian National Railway Company, freight train 459- GP-18, Mile 175, Grande Cache Subdivision Latornell, Alberta Loss of control
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0015 253 GLOSSARY AAR Association of American Railroads (United States) AFM air flow meter APB automatic parking brake ASCT automated single car test ATBE automated train brake effectiveness
BCM brake cylinder maintaining BCP brake cylinder pressure BHP brake horsepower BPP brake pipe pressure
CCFHSC Calgary Cross-Functional Health and Safety Committee CCV car control valve CFM cubic feet per minute CN Canadian National Railway Company COT&S “clean, oil, test & stencil” CP Canadian Pacific Railway Company CRM crew resource management CROR Canadian Rail Operating Rules
DB dynamic brake DP distributed power
ECP system electronically controlled pneumatic system EQS Regulations Railway Employee Qualification Standards Regulations ER equalizing reservoir
FHOP Field Hill operating procedures
GBO General Bulletin Order GOI General Operating Instructions
HP high pressure
LE locomotive engineer LER locomotive event recorder
mph miles per hour
NRC National Research Council of Canada NYAB New York Air Brake
OEM ID tag original equipment manufacturer’s identification tag
TRANSPORTATION SAFETY BOARD OF CANADA 254 OFI opportunity for improvement
PNR Prairie and Northern Region psi pounds per square inch
QSLV quick service limiting valve
RSA Railway Safety Act RSI railway safety inspector RTC rail traffic controller
SCT single car test SD standard deviation SI special instruction SMS safety management system SMS Regulations Railway Safety Management System Regulations, 2015
TC Transport Canada TSB Transportation Safety Board of Canada
WTD wheel temperature detector
FD06111 | 2019_加拿大运输安全委员会_CP原油单元列车脱轨起火_格恩西_R19W0320_火灾报告(英文).md
分类:06_境外及港澳台调查报告 | 年份:2019 | 地域: | 严重程度: | 场所:交通/车辆 | 起火原因:燃气/爆炸 | 来源格式:md
1. 标题与报告编号
- 标题:Rail transportation safety investigation R19W0320 — Main-track train derailment, CP freight train 516-398, Mile 48.86 Sutherland Subdivision, near Guernsey, Saskatchewan
- 报告编号:R19W0320
2. 机构与发布日期
- 机构:Transportation Safety Board of Canada(TSB)
- 发布:2023 年 10 月 5 日;事发 2019 年 12 月 9 日
3. 事故摘要
- 日期/地点:2019 年 12 月 9 日约 0010 CST;Mile 48.85 Wolverine Road 平交道口,near Guernsey, Saskatchewan
- 事件:Canadian Pacific 原油单元列车 516-398 东行 44 mph 触发紧急制动。1 辆沙漏斗车 +33 辆原油罐车(UN1267, Class 3, PG I)脱轨。20 辆破损泄漏。起火,多余产品聚成大池火烧约 24 小时**。无伤、无需疏散。估计约 177 万升原油泄漏(占 33 辆 57%)。
4. 原因 / 发现
- 新闻稿标题:"Undetected broken rail led to the 2019 crude oil train derailment and fire near Guernsey"。直接原因为未检出的断轨致脱轨并起火(详细 findings 见最终报告)。
5. 安全行动
- 铁路安全建议 617-02/20:按各列车风险状况修改关键列车限速。
- 铁路安全建议 617-03/20:关键路线增强轨道标准。
- (617 系列建议亦关联 R20W0025。)
FD06112 | 2020_加拿大_TSBC_R20W0025_Crude_Oil_Derailment_Fire_Guernsey_Saskatchewan_2020.pdf
分类:06_境外及港澳台调查报告 | 年份:2020 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
PROTECTED B X00X0000-ENG-EXTENSION REPORT TYPE DATE RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 MAIN-TRACK TRAIN DERAILMENT Canadian Pacific Railway Company Freight train 516-380 Mile 43.66, Sutherland Subdivision Guernsey, Saskatchewan 06 February 2020
TRANSPORTATION SAFETY BOARD OF CANADA ■ 2 ABOUT THIS INVESTIGATION REPORT This report is the result of an investigation into a class 3 occurrence. For more information, see the Policy on Occurrence Classification at www.tsb.gc.ca The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. TERMS OF USE Use in legal, disciplinary or other proceedings The Canadian Transportation Accident Investigation and Safety Board Act states the following: • 7(3) No finding of the Board shall be construed as assigning fault or determining civil or criminal liability. • 7(4) The findings of the Board are not binding on the parties to any legal, disciplinary or other proceedings. Therefore, the TSB’s investigations and the resulting reports are not created for use in the context of legal, disciplinary or other proceedings. Notify the TSB in writing if this investigation report is being used or might be used in such proceedings. Non-commercial reproduction Unless otherwise specified, you may reproduce this investigation report in whole or in part for non-commercial purposes, and in any format, without charge or further permission, provided you do the following: • Exercise due diligence in ensuring the accuracy of thr20w0025rials reproduced. • Indicate the complete title of the materials reproduced and name the Transportation Safety Board of Canada as the author. • Indicate that the reproduction is a copy of the version available at [URL where original document is available]. Commercial reproduction Unless otherwise specified, you may not reproduce this investigation report, in whole or in part, for the purposes of commercial redistribution without prior written permission from the TSB. Materials under the copyright of another party Some of the content in this investigation report (notably images on which a source other than the TSB is named) is subject to the copyright of another party and is protected under the Copyright Act and international agreements. For information concerning copyright ownership and restrictions, please contact the TSB. Citation Transportation Safety Board of Canada, Rail Transportation Safety Investigation Report R20W0025 (released 07 June 2024). Transportation Safety Board of Canada 200 Promenade du Portage, 4th floor Gatineau QC K1A 1K8 819-994-3741; 1-800-387-3557 www.tsb.gc.ca communications@tsb.gc.ca © His Majesty the King in Right of Canada, as represented by the Transportation Safety Board of Canada, 2024 Rail transportation safety investigation report R20W0025 Cat. No. TU3-11/20-0025E-PDF ISBN: 978-0-660-72067-8 This report is available on the website of the Transportation Safety Board of Canada at www.tsb.gc.ca Le présent rapport est également disponible en français.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 ■ 3
Table of contents 1.0 Factual information ................................................................................................. 5 1.1 The occurrence ............................................................................................................................................ 6 1.2 Weather .......................................................................................................................................................... 8 1.3 Site examination ......................................................................................................................................... 8 1.3.1 Derailment zones .....................................................................................................................10 1.4 Emergency response and site remediation activities .................................................................11 1.5 Recorded information.............................................................................................................................12 1.5.1 Locomotive forward-facing video camera .....................................................................12 1.5.2 Locomotive event recorder ..................................................................................................12 1.5.3 Wayside detectors ...................................................................................................................12 1.6 Subdivision information .........................................................................................................................12 1.7 Track information .....................................................................................................................................13 1.7.1 Track renewal program ..........................................................................................................13 1.8 Track inspections ......................................................................................................................................13 1.8.1 Visual inspection.......................................................................................................................14 1.8.2 Geometry inspection ..............................................................................................................14 1.8.3 Rail flaw detection inspection .............................................................................................15 1.8.4 Turnout inspections ................................................................................................................15 1.8.5 Additional Canadian Pacific inspections .........................................................................16 1.9 Rail replacement in continuous welded rail territory .................................................................16 1.9.1 Requirements for installing used rails as plug rails ....................................................16 1.9.2 Rail neutral temperature .......................................................................................................17 1.9.3 Plug rails installed near the occurrence location .........................................................18 1.10 Examination of the recovered rail pieces ........................................................................................20 1.11 Rail bolted joints in continuous welded rail territory .................................................................22 1.11.1 Longitudinal forces in bolted joints ..................................................................................23 1.12 Dangerous goods .....................................................................................................................................24 1.13 Tank car information ...............................................................................................................................25 1.14 Performance of the DOT-117J100-W tank cars ...........................................................................25 1.15 Other derailments involving tank car unit trains transporting crude oil ............................26 1.15.1 TSB investigation R19W0320 ...............................................................................................26 1.16 Recent National Transportation Safety Board recommendations for DOT-117J100-W tank cars .......................................................................................................................................................27 1.17 Studies on severity of derailments involving dangerous goods ...........................................29 1.18 TSB laboratory reports............................................................................................................................30 2.0 Analysis ................................................................................................................... 31 2.1 The accident ...............................................................................................................................................31 2.2 Plug rail installation .................................................................................................................................31 2.2.1 Rail neutral temperature after installation of the plug rail ......................................32 2.2.2 Maintenance records for the plug rail installation ......................................................32
- 3
Rail joint failure .........................................................................................................................................33 2.3.1 Broken joint bar(s) scenario .................................................................................................34 2.3.2 Broken rail scenario .................................................................................................................34 2.3.3 Sheared joint bar bolts scenario ........................................................................................35 2.4 Vertical rail head and bolt hole cracking ........................................................................................35 2.5 Plug rail inspection ..................................................................................................................................36 2.6 Tank car performance .............................................................................................................................37 3.0 Findings ................................................................................................................... 39 3.1 Findings as to causes and contributing factors ............................................................................39 3.2 Findings as to risk .....................................................................................................................................39 3.3 Other findings ............................................................................................................................................40 4.0 Safety action ........................................................................................................... 41 4.1 Safety action taken ..................................................................................................................................41 4.1.1 Transportation Safety Board of Canada ..........................................................................41 4.1.2 Transport Canada .....................................................................................................................42 4.1.3 Canadian Pacific ........................................................................................................................46 Appendices....................................................................................................................... 48 Appendix A – Rail joint strength and rail thermal stress calculations ..............................................48 Rail strength ................................................................................................................................................48 Joint bar strength......................................................................................................................................48 Connection strength ................................................................................................................................48 Thermal forces ...........................................................................................................................................49 Conclusions .................................................................................................................................................50 Appendix B – Features and appurtenances of DOT-117J100-W tank cars ....................................51 Jacket .........................................................................................................................................................51 Thermal protection...................................................................................................................................51 Shell .........................................................................................................................................................51 Protective housing for top fittings .....................................................................................................51 Head shields................................................................................................................................................51 Skid protection ..........................................................................................................................................51 Appendix C – Tank car breaches .....................................................................................................................53
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 ■ 5
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 MAIN-TRACK TRAIN DERAILMENT Canadian Pacific Railway Company Freight train 516-380 Mile 43.66, Sutherland Subdivision Guernsey, Saskatchewan 06 February 2020 The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. This report is not created for use in the context of legal, disciplinary or other proceedings. See the Terms of use on page 2. Summary On 06 February 2020, Canadian Pacific Railway Company freight train 516-380, a unit train carrying petroleum crude oil (UN1267, Class 3, Packing Group I), was proceeding eastward on the Sutherland Subdivision at about 44 mph when a train-initiated emergency brake application occurred near Guernsey, Saskatchewan. A subsequent inspection determined that 32 DOT-117J100-W tank cars had derailed near the Bloomfield Road public crossing at Mile 43.66, destroying about 300 feet of track. Thirty of the derailed cars released about 1.75 million L of crude oil. A fire ensued. Approximately 85 residents of Guernsey were evacuated, and Highway 16 was closed. There were no injuries. 1.0 FACTUAL INFORMATION On 06 February 2020 at about 0400,1 Canadian Pacific Railway Company (CP)2 train 516- 380, a unit train carrying petroleum crude oil (UN1267, Class 3, Packing Group I), departed from Sutherland Yard in Saskatoon, Saskatchewan (Mile 109.7 on the CP Sutherland Subdivision), destined for Noyes, Minnesota, in the United States (U.S.), via Winnipeg, Manitoba. The train had originated in Rosyth, Alberta (Mile 126.0 on the CP Hardisty Subdivision). The train consisted of 2 head-end locomotives, a tail-end locomotive, 104 DOT-117J100-W (DOT-117J) specification tank cars loaded with petroleum crude oil, and 2 covered hopper
1 All times are Central Standard Time. 2 On 14 April 2023, Canadian Pacific Railway Company (CP) and Kansas City Southern (KCS) combined into a single railway company (Canadian Pacific Kansas City Limited) doing business as CPKC. As the occurrence took place before the transition date, the acronym CP will be used throughout the report.
cars loaded with sand (buffer cars)3 that separated the crude oil cars from the head-end locomotives. The train weighed approximately 15 000 tons and was 6500 feet in length. It was designated as a key train4 operating on a key route.5 The train was inspected by a certified car inspector and received a No. 1 air brake test6 before departing Sutherland Yard. The crew consisted of a locomotive engineer and a conductor. Both crew members were qualified for their positions, met fitness and rest requirements, and were familiar with the territory. 1.1 The occurrence At about 0606, while proceeding eastward at 44 mph on the Sutherland Subdivision, a train- initiated emergency brake application occurred while the head end of the train was passing over the Bloomfield Road public crossing at Mile 43.63 and tail end over the east wye switch at Mile 43.66, near Guernsey, Saskatchewan (Figure 1). Once the train stopped, the crew observed a large fire behind them and called the rail traffic controller. They then separated the head-end locomotives from the rest of the cars and moved to a safe location.
3 A buffer car is a car carrying non-dangerous goods that is placed between locomotives and tank cars on a unit train carrying dangerous goods. This configuration is required by United States (U.S.) regulations. 4 The term “key train” is defined as “an engine with cars: a) that includes one or more loaded tank cars of dangerous goods that are included in Class 2.3, Toxic Gases and of dangerous goods that are toxic by inhalation subject to Special Provision 23 of the Transportation of Dangerous Goods Regulations; or b) that includes 20 or more loaded tank cars or loaded intermodal portable tanks containing dangerous goods, as defined in the Transportation of Dangerous Goods Act, 1992 or any combination thereof that includes 20 or more loaded tank cars and loaded intermodal portable tanks.” [Rules Respecting Key Trains and Key Routes (19 February 2016, approved by Transport Canada 12 February 2016), Section 3.4] 5 The term “key route” is defined as “any track on which, over a period of one year, is carried 10,000 or more loaded tank cars or loaded intermodal portable tanks containing dangerous goods, as defined in the Transportation of Dangerous Goods Act, 1992 or any combination thereof that includes 10,000 or more loaded tank cars and loaded intermodal portable tanks.” (Rules Respecting Key Trains and Key Routes (19 February 2016, approved by Transport Canada 12 February 2016), Section 3.3] 6 The No. 1 air brake test, conducted by certified car inspectors, verifies brake pipe integrity and continuity, brake rigging condition, air brake application and release, and piston travel on each car.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 ■ 7
Figure 1. Map of the occurrence location (Source: Railway Association of Canada, Canadian Rail Atlas, with TSB annotations)
An inspection of the train determined that 32 tank cars (the 31st to the 62nd car behind the head-end locomotives) had derailed, 30 of which were breached. Approximately 1.75 million L of crude oil were released. The product ignited and resulted in a large fire (Figure 2). There were no injuries reported.
Figure 2. Aerial view of the derailment site, taken at 1300 on 06 February 2020, showing derailed tank cars, several of which are engulfed in a large fire (Source: Humboldt fire department) 1.2 Weather The temperature at the time of the occurrence was about −15 °C.7 1.3 Site examination The derailment site (where the cars came to rest and the track was damaged) began at the east wye switch of the spur that leads southward to a nearby potash mine and continued eastward for about 500 feet over the Bloomfield Road public crossing at Mile 43.63. Bloomfield Road is a 2-lane gravel road that intersects the rail line at approximately 85 degrees. The crossing is oriented in a north-south direction and is protected by railway crossing signs. The track in the area runs parallel to Highway 16 (Yellowhead Highway), which is located about 130 feet north of the rail line. The Yellowhead Highway, Bloomfield Road, and the railway tracks are all elevated above the nearby countryside. The position of the derailed tank cars was as follows (Figure 3): • The first 9 tank cars (lines8 31 to 39) had derailed on the eastern side of the crossing.
7 Environment and Climate Change Canada historical data. Hourly temperature measured at the closest station to the occurrence site: Watrous East, Saskatchewan (27 km from the site). This weather station is the source for all weather data throughout this report. 8 The term “line” refers to the position of a freight car in the train, behind the head-end locomotive(s). Locomotives are not counted as cars in a train consist.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 ■ 9
• The next 21 tank cars (lines 40 to 60) had derailed on the crossing or west of it; they were perpendicular to the track, in an accordion fashion, except cars in lines 53 and 57, which came to rest mostly south of the track. • The last 2 tank cars (lines 61 and 62) were derailed upright on the track; car in line 61 was over the east wye switch. Because of the topography of the site, crude oil pooled on both sides of the crossing. The oil on the west side was first to ignite. The crossing acted temporarily as a berm but the fire propagated to the east side. Figure 3. Site diagram (Source: TSB)
About 300 feet of track extending eastward from the east wye switch was destroyed. The track leading up to the derailment site was inspected and no impact marks were observed on the track structure.
Impact marks were observed on the north-side wheel treads of tank cars located in lines 28, 29, and 30 (Figure 4). The impact mark on the tread of a wheel from the north side of the 28th car began at the flange and extended perpendicular across the wheel tread for about 2¼ inches. Several rail pieces from the west side of the crossing were recovered and sent to the TSB Engineering Laboratory in Ottawa, Ontario, for analysis. The size and intensity of the fire resulted in necessary remediation efforts by the first responders that disturbed the post-accident site, displacing cars and rail, and hampered the TSB investigation data-gathering phase.9 1.3.1 Derailment zones Examination of previous tank car derailments10,11,12 indicates that, when crude oil unit trains derail, there are typically 3 major zones within a derailment area:13 • The initial zone, zone 1, is where tank cars derail at the head end or leading portion of the derailment and generally scatter randomly. This is represented by tank cars located in lines 31 to 36 in this occurrence. In this zone, tank car bodies often separate from their truck assemblies and slide until they encounter obstacles that will slow their movement. Often, cars in this zone retain excellent shell integrity during the derailment and there is usually less tank deformation and smaller impact dents or breaches. • The 2nd zone contains the main body of the derailment. This is the zone where tank cars generally jackknife, align side by side, and/or stack up. This is represented by cars located in lines 37 to 60 in this occurrence. Tank cars in this zone usually account for the majority of the breaches and volume of product released. This can be attributed to the large dynamic forces that the tank cars experience in this zone. The first car in this zone acts as an anchor as it derails and slows or stops the forward
9 Fire suppression and remediation activities at the derailment site resulted in additional damage to the tank cars that made it difficult to distinguish from the derailment damage. 10 TSB Railway Investigation Report R13D0054 (Lac-Mégantic) and TSB Laboratory Report LP149/2013 – Field Examination of Tank Cars. 11 TSB Railway Investigation Report R15H0013 (Gladwick) and TSB Laboratory Report LP052/2015 – Examination of Tank Cars, CN Crude Oil Train U70451-02. 12 TSB Railway Investigation Report R15H0021 (Gogama) and TSB Laboratory Report LP056/2015 – Examination of Tank Cars, CN Crude Oil Train U70451-10. 13 TSB Rail Transportation Safety Investigation Report R19W0050 (St. Lazare). Figure 4. Impact mark on the tread of a wheel from the north side of car CBTX 721371 (line 28) (Source: Canadian Pacific)
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 ■ 11
progress of the subsequent derailing tank cars. The impact forces resulting from the trailing tank cars’ momentum impart large loads on the derailed tank cars that have come to rest and will often result in large tank deformations or punctures. • The 3rd zone is at the tail end of the derailment. Similar to zone 1, the remaining tank cars that derail in this zone usually scatter randomly but do not stack up. This is represented by cars located in lines 61 and 62 in this occurrence. As the cars derail in the main body of the derailment, energy is dissipated through the impacts up to the time that the tank cars separate from each other. The impacts and associated reduction in the speed of the trailing tank cars reduce the impact forces and typically result in less tank damage and associated product loss. Different types of damage, ranging both in severity and the amount of product released, have been observed in each of the 3 derailment zones. The reasons for the amount of damage sustained by each of the derailed tank cars vary, but common elements include the speed of the train at the time of the derailment, the size of the derailment area, the topography of the derailment area, and the temperature at the time of the derailment. 1.4 Emergency response and site remediation activities Once notified of the occurrence, CP immediately activated emergency response plan ERP2- 1933-067 that was provided by ConocoPhillips Company Canada, the owner and shipper of the crude oil. The plan set forth the framework and procedures to safely and effectively respond to all types of emergencies, including those involving dangerous goods. It also served as the Emergency Response Assistance Plan filed with Transport Canada (TC) under the Transportation of Dangerous Goods Act. The Royal Canadian Mounted Police, CP police, the Lanigan and the Humboldt fire departments, and emergency medical services personnel responded to the occurrence and were on site within minutes of being notified. The Saskatchewan Ministry of the Environment and an environmental private contractor also attended. A unified command structure was put in place, which included representatives from the Saskatchewan Ministry of Environment, the Lanigan Fire Department, and CP. The site was immediately secured and Highway 16 was closed to through traffic. Approximately 85 residents in the nearby town of Guernsey were evacuated. Air quality monitoring began at about 0720 and continued throughout the day to ensure the safety of personnel working at the site. Berms were created to contain the flow of released oil. Fire-control tactics, which included water to cool the tank cars and foam to extinguish fires, were implemented as soon as it was safe to do so. Tank cars not on fire were dragged clear. The tail-end cars of the train were pulled to a nearby siding.
During the evening of 06 February 2020, movement of the cars west of the crossing resulted in one car sustaining a puncture by a tractor; the punctured car released a stream of burning oil, which ignited the pool of crude oil on the east side of the crossing, resulting in a pool oil fire that engulfed many of the cars east of the crossing. Once the fires had been extinguished, the remaining oil was either vacuumed from the ground or transloaded from the rail cars and hauled away. 1.5 Recorded information 1.5.1 Locomotive forward-facing video camera The ride was reported as being “rough” over the east wye turnout and leading up to the crossing. However, a review of the forward-facing video camera recording on the train’s lead locomotive (CP 7016) showed that the track was intact as the train approached the Bloomfield Road crossing. 1.5.2 Locomotive event recorder A review of the data from the event recorder in the lead locomotive shows that: • At 0605:52, the lead locomotive entered the crossing at Mile 43.63. • At 0606:23, a train-initiated emergency brake application was registered while the lead locomotive was at Mile 43.24 and travelling at 44 mph with the throttle in position 4 and the train brakes released. • At 0607:20, the lead locomotive came to a stop at Mile 42.84 after travelling roughly 2100 feet in emergency. Based on the emergency brake application propagation rate, the train line separation occurred between the 30th car and 31st car while these cars were on the crossing at Mile 43.63. 1.5.3 Wayside detectors After departing Sutherland Yard, the train passed several wayside hot box detectors with no exceptions noted. The train had also travelled over a wheel impact load detector on 05 February 2020 at Keppel, Saskatchewan (Mile 52.4 on the Wilkie Subdivision); no abnormal reading was recorded. 1.6 Subdivision information The Sutherland Subdivision is a main track that extends westward from Wynyard, Saskatchewan (Mile 0.0), to Saskatoon (Mile 113.5). Train movements on the Sutherland Subdivision are governed by the occupancy control system, as authorized by the Canadian Rail Operating Rules, and dispatched by a CP rail traffic controller located in Calgary, Alberta.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 ■ 13
From 2017 to 2019, freight traffic, including crude oil, had been trending upward (Table 1). Table 1. Sutherland Subdivision annual freight traffic and crude oil volume, 2015 to 2019 (Source of the data: Canadian Pacific) Year Freight traffic volume (million gross ton-miles per mile) Car loads of crude oil Crude oil volume (L)
2015 16.2 11 039 1 214 290 000 2016 12.8 1936 212 960 000 2017 16.0 10 523 1 157 530 000 2018 22.5 49 711 5 468 210 000 2019 26.1 77 312 8 504 320 000 1.7 Track information The Sutherland Subdivision is Class 4 track under the Rules Respecting Track Safety, also known as the Track Safety Rules (TSR). In the vicinity of the derailment, the authorized speed for freight trains was 45 mph. The track was tangent single main track oriented in a northwest-southeast direction and relatively level. It consisted of 115-pound continuous welded rail (CWR) manufactured by Algoma Steel Inc. The rail had been previously used at another location and was installed on the Sutherland Subdivision in 1985. It rested on 14-inch double-shouldered tie plates and was fastened to hardwood ties. There were 57 ties per 100-foot section of track, and they were box anchored every tie. The ballast was round rock approximately 4 inches in diameter. In areas where the ballast had been upgraded, 4.5-inch crushed rock ballast was used. 1.7.1 Track renewal program Between 2015 and 2019, CP undertook several track renewal programs for Class 4 track on its northern main line corridor, which includes the Sutherland Subdivision. In the vicinity of the derailment, the gauge was restored for about 5900 feet of track between Mile 42.8 and Mile 43.9 in May 2019. In October 2019, the rail between Mile 42.5 and Mile 45.8 was destressed, and approximately 1000 ties were installed between Mile 41.0 and Mile 46.0. In the same period, about 11 000 of the 15 840 feet of track between Mile 42.8 and Mile 45.8 was surfaced. The maintenance records were not detailed enough to confirm that the track between the east wye switch and the crossing had been surfaced. 1.8 Track inspections The TSR set forth the minimum regulatory requirements for track maintenance and inspection.
According to the TSR, Class 4 CWR track with annual traffic greater than 15 million gross tons (MGT) must be visually inspected (on foot or in a track vehicle) at least twice weekly.14 The TSR also require that Class 4 CWR track with annual traffic between 15 and 35 MGT receive: • an electronic geometry car inspection by a heavy geometry inspection vehicle twice annually,15,16 • a rail flaw detection inspection 3 times annually,17 • a walking turnout inspection monthly,18 and • a detailed turnout inspection annually.19 1.8.1 Visual inspection In addition to the regulatory requirements, CP required the track to be visually inspected 24 hours prior to the arrival of a crude oil train, or when temperatures were at −25 °C or below. From 29 January 2020 to the date of the occurrence, visual inspections were performed daily. The most recent visual inspection was undertaken on 05 February 2020 and no defects were noted in the vicinity of the derailment area. 1.8.2 Geometry inspection In 2019, CP’s heavy track geometry vehicle inspections of the Sutherland Subdivision were performed in March, August, and November, exceeding the number of inspections required by the TSR. During these inspections, the following geometry defects were noted from Mile 43.63 to Mile 43.66: • 29 March 2019: 5 priority defects • 21 August 2019: 9 priority defects, 1 near urgent defect, 1 urgent defect • 26 November 2019: no priority defects were listed in the defect report Geometry defects are classified by CP as urgent, near urgent, and priority. Urgent defects are those that do not meet the regulatory requirements and must be protected with a slow
14 Rules Respecting Track Safety (25 May 2012, approved by Transport Canada 25 November 2011), Part II, Section F, Item 2.4: Visual Track Inspections, pp. 31-32. 15 The Rules Respecting Track Safety define “twice annually” to mean a minimum of 1 inspection each 6 months (January 1 to June 30, and July 1 to December 31), with no more than 225 days between days of inspection. (Source: Rules Respecting Track Safety [25 May 2012, approved by Transport Canada 25 November 2011], Part II, section F, Item 1: Scope, pp. 29-30). 16 Rules Respecting Track Safety (25 May 2012, approved by Transport Canada 25 November 2011), Part II, section F, Item 4: Track – Electronic Geometry Inspections), pp. 35-36. 17 Ibid., Part II, section F, Item 5: Track – Rail Flaw Inspections, section 5.2, p. 37. 18 Ibid., Part II, section F, Item 3: Track – Turnouts and Special Trackwork Inspections, section 3.3, pp. 33-34. 19 Ibid., Part II, section F, Item 3: Track – Turnouts and Special Trackwork Inspections, section 3.4, p. 34.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 ■ 15
order until corrected. Near urgent defects must be inspected and corrected as soon as possible. Priority defects must be inspected and monitored to ensure they do not become urgent defects. Following the 21 August 2019 inspection, a 25 mph slow order was placed on the track, followed by a 40 mph slow order that lasted until the urgent defect was corrected on 04 December 2019. During the 26 November 2019 inspection from Mile 43.63 to Mile 43.66, the readings were considered as “invalid” because of snowing conditions that interfered with them. CP consequently followed the instructions provided in the TSR for situations where the track cannot be inspected at the required interval: 4.3 Missed Segment of Electronic Geometry Inspection
a) If a portion of track cannot be inspected at the required interval, the railway must, before the expiration of time or tonnage limits:
(i) Inspect that segment of track with a light geometry inspection vehicle and be governed by the results of that inspection or perform an additional visual inspection per week until the required track geometry inspection frequency can be met and, in the case of Class 3 to Class 5 track the next required track geometry inspection must be completed with a heavy geometry inspection vehicle, or
(ii) Reduce class of track to bring the track into compliance until such time as a valid track geometry inspection can be made.20 1.8.3 Rail flaw detection inspection In 2019, CP conducted 7 rail flaw detection inspections. The most recent inspection occurred on 17 December 2019. No defects were detected in the vicinity of the occurrence. 1.8.4 Turnout inspections The last annual detailed turnout inspection occurred on 12 June 2019. A detailed inspection evaluates, through measurement, observation and use, the condition of the track (including the ballast, rails, and ties), and all components of the switch to ensure the turnout is kept in compliance with the standards and that deviations from the standards are protected or brought back into compliance. No defects were noted. The last monthly walking inspection of the turnout was undertaken on 20 January 2020. The point on the frog was observed to be damaged. The turnout was scheduled to be repaired before 20 February 2020.
20 Ibid., Part II, Section F, Item 4: Track – Electronic Geometry Inspections, section 4.3(a): Missed Segment of Electronic Geometry Inspection, p. 36.
- 8.5
Additional Canadian Pacific inspections In addition to the minimum regulatory requirements for track maintenance and inspection specified in the TSR, CP implemented the following additional inspections: • Vehicle track interaction (VTI) inspections • Autonomous track geometry measuring system (ATGMS) inspections • Walking joint bar inspections 1.8.5.1 Vehicle track interaction inspections To supplement track geometry inspections, CP uses some locomotives to conduct VTI inspections. VTI locomotives are equipped with accelerometers that monitor track conditions and communicate rough spots in the track while in normal train operation. The rough spots are associated with higher-than-usual wheel impact loading that could lead to a potential broken rail. The most recent VTI inspection was undertaken on 19 October 2019. There were no VTI events that required attention in the vicinity of the derailment. 1.8.5.2 Autonomous track geometry measuring system inspections ATGMS are specially equipped box cars that operate in revenue train service. This enables more frequent geometry testing and identifies emergent geometry conditions. The ATGMS supplements the track evaluation cars currently in operation. The most recent ATGMS inspection occurred on 09 October 2019. There were no conditions that required attention in the vicinity of the derailment. 1.8.5.3 Walking joint bar inspections CP implemented bi-annual joint bar inspections for Class 4 CWR track with an annual tonnage between 15 and 35 MGT, including the Sutherland Subdivision. These walking joint bar inspections are specifically looking to identify cracked/broken joint bars as well as loose, broken, or missing bolts. The last joint bar inspection was performed on 06 December 2019, and no joint bar defects were found in the vicinity of the derailment. 1.9 Rail replacement in continuous welded rail territory When CWR is worn or damaged and needs replacement, the defective section of rail is typically cut out and a replacement rail (plug rail) is installed. A plug rail can be new rail or rail that was removed from service and found suitable for reuse. The plug rail can be welded to the parent rail or secured using bolted joints. To join plug rails by bolted joint, a joint bar is fitted on each side of the rail ends. The assembly is fastened together, through the web of the rails, with 4 or 6 bolts. 1.9.1 Requirements for installing used rails as plug rails When rail is removed from service and is to be used as plug rail, it is visually inspected, ultrasonically tested, measured for head wear and flange wear, and then stacked on a rail
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 ■ 17
rack to await installation. These measures reduce the risks of re-introducing a defective rail back into service. Regarding the reuse of rail, CP’s Red Book of Track & Structures Requirements (the Red Book) states, in part: 6.1.8 Marking Rail Removed from Track […] iii. Rail determined suitable for re-use over which 10 MGT or less traffic has run over the rail since it was last ultrasonically tested is to be marked with the letters UTV (for ultrasonic test verified) and with the date of the last ultrasonic test on the web of the rail in 2” or greater letters with white permanent marker. iv. Rail determined suitable for re-use which has not been ultrasonically tested, or over which more than 10 MGT traffic has run over the rail since it was last ultrasonically tested is not to be installed and is to be left for future ultrasonic testing. The tester marks the rail with the letters UTT (for ultrasonic test tested) and with the date of the test on the web of the rail in 2” or greater letters with white permanent marker. v. Rail planned for re-use, which is not marked UTT or UTV and for which the testing history is not known, may only be installed in track with the approval of the Director Track Standards, and if installed requires the application of a speed restriction of not more than 25 mph or the maximum speed for the class of track concerned, whichever is less, until the rail has been tested for internal defects.21 1.9.2 Rail neutral temperature To prevent pull-aparts and track buckles in CWR track, it is important to manage the internal stresses in the rail, including when the rail is cut and sections are added or removed. Temperature variations generate internal thermal stresses in CWR. At the rail neutral temperature (RNT), the rail is free of any tensile or compressive stress. Whenever the temperature of the rail diverges from its neutral temperature, internal stresses develop—compressive when the temperature is above the RNT and tensile when it is below. Excessive compressive forces can cause track buckling, while excessive tensile forces due to contraction can lead to pull-aparts (joint bar failures or rapid rail fractures). Rail is preferably installed or adjusted at a specific temperature set for the climatic conditions of the subdivisions at which the rail remains relatively stress-free all year round, considering the regional ambient temperature extremes to which it will be exposed. This temperature is known as the preferred rail laying temperature (PRLT). On the Sutherland Subdivision, the PRLT is 95 °F. When the RNT differs from the PRLT by a prescribed amount, the rail length should be adjusted accordingly to reset the stress in the rail, a process called destressing.
21 Canadian Pacific Railway Company, Red Book of Track & Structures Requirements, (revised 28 October 2019), Section 6.1.8: Marking Rail Removed from Track.
Temperature swings, track maintenance activities, and traffic-induced movements of the rail can cause a change or redistribution of the rail’s internal stresses, thus modifying the RNT. In general, the RNT decreases over time and becomes different from the PRLT. According to the Red Book, the estimated RNT following a rail replacement due to a pull- apart or a rail break can be estimated using the measured rail temperature and the effective rail gap.22,23 1.9.3 Plug rails installed near the occurrence location 1.9.3.1 Plug rail installed on 14 January 2020 During a visual inspection before the passage of a crude oil train on 14 January 2020, a rail break was detected in the north rail of the track just east of the east wye switch at Mile 43.66. The break was located near a joint, 6 feet (3 to 4 ties) from the east wye switch point. A 22-foot piece of rail was removed and a plug rail of similar length was installed eastward from the joint. The plug rail did not have any marking (i.e., UTV or UTT) to indicate that it had been inspected for internal flaws as required. The original joint bars were visually inspected as required24 and reinstalled. The tie plates supporting the joint were shimmed to ensure a proper level.25 The work was performed by a team from Sutherland Yard. That same team had changed several broken rails during a cold snap in January 2020. The air temperature was around −30 °C (−22 °F) at the time of the installation. 1.9.3.2 Plug rail installed on 29 January 2020 On 28 January 2020 and 29 January 2020, TC inspectors inspected the Wilkie and the Sutherland subdivisions and noted multiple instances of plug rails on the Wilkie Subdivision not being ultrasonically tested. At the end of 29 January 2020,26 the 22-foot-long plug rail installed at Mile 43.66 on 14 January 2020 was replaced by a winter Utility team working in dark, windy, sub-zero
22 The effective rail gap is the sum of the pull-apart (opening gap) and the cut-out rail (rail removed). 23 Canadian Pacific Railway Company, Red Book of Track & Structures Requirements, (revised 28 October 2019), Appendix 14: Estimated Rail Neutral Temperature. 24 Whenever a joint bar has been removed for inspection or replacement, the bar to be installed, and also the adjacent joint bar, must be visually inspected for cracks or excessive wear. (Canadian Pacific Railway Company, Red Book of Track & Structures Requirements [revised 28 October 2019], Section 14: Track Inspection, item 14.14.0(p)) 25 Shims are typically made of hardwood and are used to temporarily correct geometry defects. Installing shims is a common and approved method for temporary winter track maintenance to compensate for low ties when the track bed is frozen. 26 While track maintenance records indicate 30 January 2020 as the shift during which the plug rail was installed, this shift began on the evening of 29 January 2020.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 ■ 19
conditions. Additionally, the crew of a waiting train requested an estimated time of completion, making the team aware of the need to complete the work quickly. On the day of the installation, the minimum air temperature was around −5 °C (23 °F) at the end of the afternoon and the evening. That evening, the wind was around 20 km/h, resulting in a wind chill factor of −10.27 To install the plug rail, the team first dismantled the joints. The bolts were difficult to remove28 and a 1.5-inch gap occurred after they were removed. A piece of rail measuring 39 feet and 1.5 inches was cut out of the track and a 39-foot piece of replacement rail, with pre-drilled holes for the joint bars, was installed, extending eastward from the existing west joint and towards the crossing. The plug rail had a “UTT 09/19” marking on the web, indicating that the rail had been tested for internal defects in September 2019. The original joint bars were visually inspected as required and re-used on the west joint, while 2 new joint bars were installed on the new east joint. The rail was elongated with a heating rope and drift pins were used to align the bolt holes in the rail and in the joint bars. New bolts were used to fasten the joint bars to the rails. The west joint was sitting between 2 ties that were reported to be in good condition; no shims were installed. The original anchors (Improved Fair anchors) were reinstalled. During the period between the installation of the plug rail and the accident, temperature swings between negatives and positives occurred; on 01 February 2020, the temperature reached 6 °C and then it dropped to −24 °C on 04 February 2020. The winter utility team that installed the plug rail comprised a foreman, a truck driver, and 2 machine operators. The team foreman was qualified for his position, was familiar with the Red Book, and had participated in rail installations in the past; however, the team’s main regular task was the cleaning of switches and crossings during the winter season. The foreman did not hold a permanent position and was assigned to the production gangs in the summer. 1.9.3.3 Digital Track Notebook database Whenever rail is installed, the rail temperature, the rail movement, the rail removed, the effective rail gap, and the RNT of the plug rail are recorded in CP’s Digital Track Notebook (DTN) database. 1.9.3.3.1 Plug rail installed on 14 January 2020 The following data were recorded in the DTN database for the 22-foot plug rail installed on 14 January 2020: • Rail temperature: 2 °F (−17 °C)
27 The wind chill factor does not apply to the rail temperature or the rail neutral temperature. 28 CP’s typical practice when replacing rail at a joint is to cut the rail before attempting to dismantle the joint.
• Rail movement: 1.25 inches • Rail removed: 0 inch • Effective rail gap: 1.25 inches • Estimated RNT: 80 °F (27 °C) 1.9.3.3.2 Plug rail installed on 29 January 2020 For the 39-foot plug rail installed on 29 January 2020, the winter utility team foreman completed a CWR maintenance form at the end of his shift and left it at the supervisor office where the information pertaining to the plug rail installation was transferred later to the DTN database. The following data were recorded in the DTN database: • Rail temperature: 12 °F (−11 °C) • Rail movement: 1.5 inches • Rail removed: 1.5 inches • Effective rail gap: 1.5 inches • Estimated RNT: 91 °F (33 °C) Several DTN data fields pertaining to the installation of the 29 January 2020 plug rail are inaccurate. On 29 January 2020, the air temperature gradually decreased from a maximum of 26.6 °F (−3.0 °C) just after midnight to a minimum of 23.4 °F (−4.8 °C) during the end of the afternoon and early evening; therefore, the rail temperature could not have been 12 °F (−11 °C).29 Moreover, the effective rail gap should be 3 inches and the estimated RNT should be 125 °F and not 91 °F. 1.10 Examination of the recovered rail pieces Among the rail pieces received at the TSB Engineering Laboratory, 5 of them were assembled into one contiguous rail length measuring approximately 39 feet, which corresponds to the plug rail installed on 29 January 2020. However, none of the parent rail at either end of the plug rail, nor the joint bars and bolts used to connect the plug rail, were found. The rail was identified as 115-pound rail30 manufactured in 1971 by Algoma Steel Inc. The provenance of the rail and its accumulated tonnage are not known. It had between ¼ inch and 5/16 inch of head wear and had 3 holes drilled at each end. A “UTT 09/19” white marking was written on the gauge-side web of one of the rail pieces. At the west end of the plug rail, the rail exhibited a vertical head crack and a 6.3-inch missing portion of rail head on the gauge side (Figure 5). The overall appearance and
29 Given the conditions at the time of the occurrence, rail temperature could only have been higher than air temperature (sun effect) but not lower. 30 The width of a 115-pound rail head is 223/32 inches, the height of the rail is 65/8 inches, and the width of the rail base is 5½ inches.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 ■ 21
orientation of the fracture surface is consistent with either a vertical split head31 or a shear break failure. When a vertical split head occurs at a joint, it is categorized as a VSJ (vertical split head joint area).32 Figure 5. West end of the recovered plug rail, showing impact mark and missing rail head (Source: TSB)
At the same rail end, the remaining head of the rail on the field side had been battered by wheel impacts. On the gauge side, no impact or rubbing marks were visible on the transverse fracture of the rail head. There was also a horizontal crack extending from the rail end to the first bolt hole (Figure 6).
31 A vertical split head rail defect is a progressive longitudinal fracture in the head of the rail, where separation along a seam spreads vertically through the head at or near the middle of the head. 32 The Federal Railroad Administration’s Track Inspector Rail Defect Reference Manual (July 2015) refers to a vertical split head defect that occurs at a joint as a vertical split head joint area (VSJ).
Figure 6. West end of the recovered plug rail showing a bolt hole crack (Source: TSB) Examinations of the fracture surfaces of the VSJ/shear break and the bolt hole crack found that extensive rubbing and corrosion damage obliterated most of the fracture surface features. It was concluded that the remaining scattered pockets of cleavage facets indicated that both cracks probably led to failure due to brittle overload. The inspection of the fracture surfaces did not reveal signs of fatigue. Bolt hole cracks are usually the result of “unusual stresses along the edge of the hole from the bolt itself. These stresses may be caused by pumping or swinging joints, improper drilling, excessively worn joint bars or abnormal rail end impacts from rolling stock.”33 It was not possible to determine with certainty if the fractures occurred before the derailment or as result of it. 1.11 Rail bolted joints in continuous welded rail territory Rail joints introduce discontinuities in the geometric and mechanical properties of the rail and are often considered one of the weakest locations in the track structure, making it more susceptible to defects and failures. Once assembled, a bolted joint cannot preserve the continuity of the rail by providing similar strength, stiffness, flexibility, and uniformity as the rail that it joins. Even when a joint is properly supported by sound ties and tamped ballast, its moment of inertia34 is only about ⅓ of the value for corresponding non-jointed
33 Sperry Rail Service, Rail Defect Manual (2016), p. 68. 34 The moment of inertia is the measure of the capacity of an object’s cross-section to resist bending.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 ■ 23
rail.35 Consequently, bolted joints can be subject to high impact loading as rolling stock wheels pass over them.36 These impact loads may cause or exacerbate the loosening of the joint bolts. Newly installed bolts, even when properly tightened, can lose from ¼ to ⅓ of their initial preload tension during their first month of installation.37 The bolts may loosen more rapidly when a joint is not properly supported. In addition, temperature swings are known to quicken the loosening of bolts in rail joints. 1.11.1 Longitudinal forces in bolted joints In a properly maintained track, longitudinal forces (thermal forces from temperature changes and train forces from traction and braking) are absorbed by the ballast through the anchoring system and the ties. In the absence of adequate restraining support by the ballast, ties, and anchors, the bulk of the forces are transferred by the rails through the joints; more precisely, longitudinal forces are transmitted to joint bars through the bolts and by friction between the surfaces of the joint bars and the rail. However, if the bolts are loose, the friction dissipates and the longitudinal forces are transmitted to the joint bars only through the bolts. The resisting force of the joint connection is therefore strongly related to the condition of the bolts. The resisting force in a joint must be high enough to withstand the combined effect of vertical and longitudinal loads, otherwise the joint will fail. In some cases, failures can occur under the effect of longitudinal thermal forces only, particularly at extreme temperatures. In support of this investigation, the tensile loads required to cause the failure of the rail and the joint bars for the west joint of the plug rail installed on 29 January 2020 were calculated; the joint connection resisting force and the thermal forces exerted on the joint were also calculated (Appendix A). The results indicate the following (assuming the joint components were free of defects): • The tensile load that would have been required to cause the failure of the 115- pound rail was calculated to be greater than approximately 1 598 900 pounds of force. • The tensile load that would have been required to cause the failure of the joint bars was calculated to be greater than approximately 1 170 000 pounds of force. • The resisting force of the joint connection is the sum of the forces provided by the friction between the joint bars and the rail, and the shear strength of the bolts.
35 Dr. A. D. Kerr, Fundamentals of Railway Track Engineering, (Simmons Boardman Publishing Corporation, 2003), p. 76. 36 Ibid. 37 American Railway Engineering and Maintenance-of-Way Association (AREMA), Manual for Railway Engineering (2014), Volume 1, Chapter 5, Part 5, Section 5.5: Track Bolt Tension Practice.
Considering the short length of track over which the relatively low number of anchors supported the 39-foot plug rail, and their holding condition (re-used several times), the resisting force provided by the anchors and track structure (ties and ballast) was negligible. The joint connection resisting force was calculated to be approximately 342 000 pounds, assuming the bolts were tight. If the bolts were loose, the resisting force would be provided only by the bolts and was calculated to be approximately 252 000 pounds. • The longitudinal thermal force at the time of the occurrence was calculated to be approximately 262 500 pounds; it was calculated to be approximately 298 000 pounds on 04 February 2020 when the temperature was −24 °C (−11.2 °F). 1.12 Dangerous goods The transportation of dangerous goods38 by rail in Canada39 and in the U.S.40 is governed by federal regulations. In this occurrence, petroleum crude oil, a Class 3 flammable liquid, was being transported in 104 tank cars. Class 3 flammable liquids are dangerous goods whose vapours can form an ignitable mixture with air at or below a temperature of 60 °C (140 °F). These flammable liquids can pose serious hazards due to their volatility and flammability, which are determined by the initial boiling point41 and the flash point,42 respectively. Because the volatility and flammability of flammable liquids vary widely, they are grouped together based on these characteristics so that different requirements for packaging, storage, handling, and transportation can be established. According to the Transportation of Dangerous Goods Regulations, Class 3 flammable liquids are divided into 3 packing groups (PG), ranging from PG I (highest hazard) to PG III (lowest hazard). The specific criteria for these packing groups are: • PG I—if the flammable liquid has an initial boiling point of 35 °C (95 °F) or less at an absolute pressure of 101.3 kPa and any flash point; • PG II—if the flammable liquid has an initial boiling point greater than 35 °C (95 °F) at an absolute pressure of 101.3 kPa and a flash point less than 23 °C (73 °F); and • PG III—if the criteria for inclusion in PG I or PG II are not met.
38 Dangerous goods are also referred to as “hazardous materials” in the U.S. In this report, the term “dangerous goods” is used, except when referring to U.S. regulations or standards. 39 Transport Canada, Transportation of Dangerous Goods Act, 1992 and Transportation of Dangerous Goods Regulations. 40 U.S. Code of Federal Regulations, Title 49 (49 CFR), Hazardous Materials Regulations. 41 The initial boiling point of a liquid mixture is the temperature value when the first bubble of vapour is formed from the liquid mixture, at a given pressure. The initial boiling point is a function of pressure and composition of the liquid mixture. 42 The flash point of a liquid is the minimum temperature, under laboratory conditions, at which the liquid gives off vapour in sufficient concentration to form an ignitable mixture with air near the surface of the liquid. A lower flash point represents a greater flammability hazard.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 ■ 25
In this occurrence, the petroleum crude oil being transported was listed as a flammable liquid in Class 3, PG I. 1.13 Tank car information The crude oil was transported in DOT-117J tank cars43 in accordance with the Transportation of Dangerous Goods Regulations. DOT-117J tank cars are the newest tank cars built to transport Class 3 flammable liquids, including petroleum crude oil. The tank cars involved in this occurrence were all manufactured by TrinityRail in 2019 and each had an average capacity of about 108 881 L. The design characteristics of DOT-117J tank cars include a thicker, insulated/thermally protected tank, a full head shield, top fitting protection, and disengaging bottom outlet valve handles (see Appendix B for full details). 1.14 Performance of the DOT-117J100-W tank cars The TSB laboratory examined the derailed DOT-117J tank cars that were in the main pile-up and had sustained significant damage. All the tank cars involved in this occurrence were equipped with a ½-inch-thick ceramic thermal protection blanket between the tank car shell and jacket. The following observations were made for the 30 derailed tank cars that lost product:44 • 9 lost their entire load, • 11 lost at least half their load, • 4 lost less than half their load, and • 6 experienced some product loss but no obvious breach location was identified, and losses may have been due to pressure relief device activation. Some of the tank cars were further damaged during remediation activities. These damages occurred when first responders and remediation teams displaced tank cars to combat fires, contain leaks, and recover product. During the damage assessment examination of the tank cars, it was difficult to differentiate between derailment damage and remediation damage. Many of the shell breaches were punctures consistent with collisions with sharp, relatively small objects (couplers, trucks, bolsters). A few tank cars exhibited fractures due to large crushing damage typically caused when 2 tank car bodies collide.
43 DOT-117J100-W tank cars conform to specifications under the U.S. Code of Federal Regulations, Title 49, sections 179-200. In Canada, tank car specifications are set out by Transport Canada under the Transportation of Dangerous Goods Regulations and the TP 14877 standard. The Canadian version of the DOT-117 is the TC-117. 44 Some of the product may have been lost as a result of the first response and remediation process.
The head damage ranged from relatively minor dents to deep dents with punctures that breached the head. Of the 30 cars that lost product, 11 had one or more breaches with features consistent with mechanical shear cutting of the tank shell and/or head. It was not possible to determine if an initial breach existed due to the derailment, which was later enlarged by mechanical shear during remediation efforts. A breach point could not be identified for 6 cars; however, it is possible that the loss of product was the result of the pressure relief device activating while the tank cars were in the fire, or damaged seals on the bottom outlet valves due to the exposure to intense heat from the fire. The observed breaches, detailed in Appendix C, are as follows: • Top fitting breaches and pressure relief device releases (15 cars: 8 confirmed and 7 suspected)45 • Shell breaches (11 cars: 8 confirmed and 3 suspected) • Head breaches (7 suspected) • Bottom outlet valve releases (5 suspected) • Manway breaches (3 cars: 2 confirmed and 1 suspected) Finding: Other Although the tank cars had been subjected to a pool fire that burned for approximately 19 hours, no thermal tears were observed. 1.15 Other derailments involving tank car unit trains transporting crude oil Four previous derailments involving tank car unit trains transporting crude oil (1 of them a CP train) were investigated by the TSB from 2015 to 2020.46 A total of 138 tank cars loaded with crude oil derailed, releasing a combined total of approximately 6.8 million L of product. These 4 accidents share some common elements, specifically, • they all involved crude oil unit trains operating on key routes, and • they all occurred primarily as a result of inadequate track maintenance and related joint or rail conditions. 1.15.1 TSB investigation R19W0320 Less than 2 months before this occurrence, another crude oil unit train derailed only 5 miles to the west on the Sutherland Subdivision, resulting in a large amount of crude oil being lost and a resulting pool fire that engulfed many of the derailed cars.
45 Cars had product release, but the examination was unable to determine if the damages were from the derailment or remediation work. 46 TSB rail transportation safety investigation reports R19W0320, R19W0050, R15H0021, and R15H0013.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 ■ 27
On 09 December 2019 at about 0010 Central Standard Time, CP petroleum crude oil unit train 516-398, hauling 99 loaded tank cars and 2 cars loaded with sand, was proceeding eastward at 44 mph on the Sutherland Subdivision when a train-initiated emergency brake application occurred at the Wolverine Road public passive crossing located at Mile 48.85, near Guernsey, Saskatchewan.47 Subsequent inspection determined that 1 covered hopper car loaded with sand and 33 tank cars, 9 built to the DOT-117R specification and 24 built to the CPC-1232 specification, loaded with petroleum crude oil had derailed. Twenty of the 33 derailed tank cars were breached and released their contents. The released product ignited, and excess product gathered into a large pool that burned for about 24 hours. Several tank car shells, heads as well as wheels and axles of various cars were melted. Although signs of potential thermal tears were observed, the presence of thermal tears could not be confirmed with any certainty due to the extent of the tank car damage. There were no injuries, and no evacuation was required. The temperature at the time of the accident was −19 °C (-2 °F). It is estimated that a total of approximately 1.76 million L of petroleum crude oil was released to surface and atmosphere, which was about 57% of the total volume that was transported in the 33 derailed tank cars. The Board found that: • The derailment occurred when the CP crude oil unit train traversed a gap in the south rail while traveling eastward on the Sutherland Subdivision, near Mile 48.86. • The south rail head was exposed after an undetermined length of the rail had broken away and separated from the track, when the south rail likely failed under a previous train, prior to the arrival of the occurrence train. • The track components (anchors, ties, and ballast) did not provide adequate resistance to the rail longitudinal tensile forces initiated by the cold weather, which contributed to a rail that broke under normal service loads prior to the arrival of the train. 1.16 Recent National Transportation Safety Board recommendations for DOT- 117J100-W tank cars On 26 September 2023, the U.S. National Transportation Safety Board (NTSB) released a synopsis of its final report on the derailment of a BNSF Railway Company train that occurred on 08 January 2022, in Oklaunion, Texas.48 The train derailed 37 DOT-117J tank
47 TSB Rail Transportation Safety Investigation Report R19W0320. 48 U.S. National Transportation Safety Board (NTSB), Hazardous Materials Investigation Report HZIR-23-01, BNSF Railway Company Derailment and Pool Fire Involving DOT-117J Tank Cars, Oklaunion, Texas, 08 January 2022 (published 27 September 2023).
cars carrying denatured ethanol49 while travelling at a speed of 50 mph. Approximately 2.28 million L of denatured ethanol was released from 28 of the 37 derailed tank cars. The ethanol ignited and burned uncontrolled for about 4 hours, resulting in a pool fire. The report contains some findings50 specifically related to some DOT-117J deficiencies observed during the NTSB investigation: • “Gaskets currently used in DOT-117J tank car service equipment may be made of materials vulnerable to thermal damage when exposed to fire, which can lead to the release of hazardous material.” • “Using gaskets with higher service and survival temperatures would likely increase the fire exposure survival time of DOT-117J tank car service equipment in flammable liquid service and reduce the severity of hazardous materials releases”. • The Pipeline and Hazardous Materials Safety Administration’s 2016 “expansion of existing thermal protection system regulations from pressure tank cars to non- pressure DOT-117J tank cars likely did not account for the design differences between these types of tank cars, thus a DOT-117J tank car certified as compliant with regulations may have deficient thermal protection because its service equipment may not be protected by its thermal blanket.” • “The mechanical breach of tank car TILX 731751 between the tank head material and the front sill pad occurred because the window weld between the front sill pad and the tank continued to provide a load path between the tank head and the stub sill while the head brace remained attached to part of the front sill pad, leading to a local stress state that exceeded the strength of the tank head material.” • “Because welds between the head brace and front sill pad exceeded their design sizes, the strength of the head brace attachment weld for tank car TILX 731751 likely exceeded the load-carrying capability of the underlying front sill pad, reducing the probability of the weld failing as intended when placed under high loads, such as the ones that occur during a derailment, and resulting in the tank car being mechanically breached.” As a result of this investigation, the NTSB recommended51 that:
- The Federal Railroad Administration and the Pipeline and Hazardous Materials
Administration work together “to develop and publish both benchmarks and thermal performance standards for gaskets used in tank cars transporting flammable liquids.”
49 Denatured ethanol is ethanol treated with gasoline to render it undrinkable. The ethanol in this derailment was being shipped as UN1987, Alcohols, N.O.S. (Ethanol, Natural Gasoline), Class 3, Packing Group II. 50 U.S. National Transportation Safety Board (NTSB), Hazardous Materials Investigation Report aHZIR-23-01, BNSF Railway Company Derailment and Pool Fire Involving DOT-117J Tank Cars, Oklaunion, Texas, 08 January 2022 (published 27 September 2023), section 3: Conclusions, p. 27. 51 Ibid., Executive Summary, p. vii.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 ■ 29
- The Pipeline and Hazardous Materials Administration “revise the DOT-117J tank car
specification to ensure that these tank cars use appropriate thermal protection systems, and that the Association of American Railroads update its certification process to ensure that tank cars comply with this revised specification.”
- “The Association of American Railroads create an inspection standard in the Manual
of Standards and Recommended Practices for rejecting oversized welds at key points on tank car underframes.” 1.17 Studies on severity of derailments involving dangerous goods In December 2019, the National Research Council Canada released report ST-R-TR-0118, entitled Study on the Factors that Increase the Severity of the Outcomes for Derailments Involving Dangerous Goods and Identification of Mitigation Measures.52 This undertaking was commissioned by TC in response to TSB Recommendation R17-01, which resulted from TSB Rail Transportation safety investigation report R15H0013. The Board recommended that TC conduct a study on the severity of the outcomes for derailments; identify appropriate mitigating strategies, including train speeds, for various train risk profiles; and amend the Rules Respecting Key Trains and Key Routes. In March 2021, the Board considered the response to Recommendation R17-01 to be Fully Satisfactory. The study noted that there is a complex relationship among train speed, train length, and mechanism of derailment, all of which can influence the severity of a derailment’s outcome. The study also noted that derailments caused by broken rails, rail welds, or broken joint bars had a much higher occurrence rate and derailed more cars per accident for a given speed. As speed increased, these types of derailments resulted in more severe accidents compared to other accident causes. The review of the Rules Respecting Key Trains and Key Routes within the study determined that the rules could be improved to account for the track repair and maintenance processes of railways in Canada. The study concluded that sections 5.3 and 5.4 of the Rules concerning the joint bars should have a procedure in place for the temporary installation and inspection of joint bars and plug rails in CWR territory and that the procedure should include a frequency at which the temporary joint bar and/or plug rail will be inspected until it is permanently repaired. As well, the study recommended that the inspection frequency should be related to traffic volumes and the presence of key trains in the traffic. The Rules Respecting Key Trains and Key Routes were amended on 22 August 2021 to require companies to develop a maintenance and inspection plan for permanent rail joints 52 E. Toma, A. Jahagirdar and Z. Schenk, Study on the Factors that Increase the Severity of the Outcomes for Derailments Involving Dangerous Goods and Identification of Mitigation Measures, (National Research Council Canada, 15 December 2019) at https://tc.canada.ca/en/road-transportation/road-publications/study-factors- increase-severity-outcomes-derailments-involving-dangerous-goods-identification-mitigation-measures (last accessed on 25 April 2024).
and temporary rail joints. The plan must detail the frequency and methods of inspection, time limits for the retention of temporary rail joints until permanently repaired and include a requirement that records be retained for a minimum of one year regarding the temporary rail joint. The amendment of the rules is a positive step to reduce derailments caused by rail joint failures such as those observed in the 29 January 2020 plug rail installation. Finding: Other The amendment of the Rules Respecting Key Trains and Key Routes to include a procedure for the installation and inspection of joint bars and plug rails is a positive step to reduce the risks of rail joint failures. A more recent study was conducted by TC53 to evaluate the structural performance of TC- 117J tank car designs in derailment scenarios, using a combination of derailment simulations, puncture performance evaluations, and considerations for cold weather material performance. This testing included TC-117J as well as TC-117R variants. The model used in simulations consisted of 100-car unit trains of TC-117J tank cars at a range of speeds up to 60 mph. A total of 18 simulations were performed to account for variations in force to initiate derailment, track conditions, and ground conditions. These simulations resulted in a histogram of predicted impact forces, and a number of tank car punctures, at each speed. They also gave predicted impact velocities for top fittings in the derailments. Top fitting failures were found to increase significantly with speed, in a similar way to tank punctures. The study showed that the structural damage to tank cars in derailments increases significantly with speed. It also found that, regardless of speed, the TC-117J tank cars performed better than all other tank car variants in derailment scenarios. 1.18 TSB laboratory reports The TSB completed the following laboratory reports in support of this investigation: • LP011/2021 – Tank Car Examination • LP020/2022 – Rail Examination • LP124/2023 – Fractographic Analysis of Rail Piece #23
53 Transport Canada, Transportation of Dangerous Goods Scientific Research Division, TP 15544E: Structural Performance of TC-117J Tank Cars and TC-117R Variants under Derailment Conditions (2022).
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 ■ 31
- 0
ANALYSIS The train was operated in accordance with regulatory requirements. The actions of the train crew were not considered to be contributory to the accident. Moreover, the train was inspected by a certified car inspector before departure and by wayside detectors en route and no mechanical defects were discovered. Consequently, the analysis will focus on the track infrastructure and, more specifically, on the plug rail installed on 29 January 2020 between the east wye switch and the Bloomfield Road crossing. This is the first derailment investigated by the TSB involving a significant number of DOT- 117J100-W (DOT-117J) specification tank cars. The DOT-117J tank car is the latest standard of tank car for crude oil shipments; therefore, their performance during the derailment will also be discussed. 2.1 The accident On 06 February 2020 at about 0606, Canadian Pacific Railway Company (CP) train 516-380 was travelling eastward at about 44 mph on the Sutherland Subdivision when a train- initiated emergency brake application occurred as the train was passing over the east wye switch at Mile 43.66 and the grade crossing at Mile 43.63. The train derailed 32 DOT- 117J tank cars and destroyed about 300 feet of track. Twenty-one of the tank cars came to rest in an accordion fashion over a relatively short distance. The severity of the derailment is consistent with a high-speed derailment caused by a catastrophic rail failure. The track damage began just east of the east wye switch. A 39-foot-long plug rail had been installed on this section of track on 29 January 2020. The west end of this plug rail had a 5- inch portion of the head missing on the gauge side and the remaining head of the rail on the field side had batter caused by wheel impact. The presence of rail batter on the remaining portion of the plug rail head indicates that the derailment occurred immediately west of the plug rail. Cars in lines 28 to 30 had impact marks on the north-side wheels, consistent with the rail batter observed on the west end of the plug rail, which suggests that the plug rail’s west joint most likely failed under the 28th car. Based on the emergency brake application propagation rate, the train line separation occurred between the 30th and the 31st car just after they had passed over the east wye switch. Finding as to causes and contributing factors The west joint of a plug rail, located at Mile 43.66 of the Sutherland Subdivision and installed on 29 January 2020 (8 days prior to the occurrence), most likely failed under the 28th car of CP train 516-380, causing the train to derail after the passage of the 30th car. 2.2 Plug rail installation On 14 January 2020, a 22-foot plug rail was installed to replace a broken rail at Mile 43.66. During installation of this plug rail, the tie plates supporting the west rail joint were
shimmed to provide a level support, which indicates that there was a low spot in the track. Because the track bed was frozen, the low spot would persist until the track bed thawed and the track could be surfaced. The plug rail installed on 14 January did not have a “UTT” marking, as required by the regulations, and was therefore replaced with a different plug rail on 29 January 2020. The plug rail installation on 29 January was performed by a winter utility team composed of a foreman, a truck driver, and 2 machine operators. This team’s main task was the cleaning of switches. Although the team foreman was qualified for the position, familiar with the CP’s Red Book of Track & Structures Requirements (the Red Book) and had participated in several rail installations in the past, rail replacement was not part of his routine tasks. The plug rail installation work was executed in dark, windy, sub-zero conditions. Additionally, the team was aware of a train waiting to pass, which can create a perception of time pressure and the need to complete the work quickly. No shims were used when the 39-foot plug rail was installed on 29 January, leaving the rail joint poorly supported. The absence of shims would have increased the vertical displacement and impact forces at the joint and could have contributed to the roughness of the ride reported by the train crew in the area of the 39-foot plug rail. Finding as to causes and contributing factors The plug rail installation was executed by a winter utility team that did not routinely replace rail and was performed under demanding working conditions, both of which likely contributed to the installation of a poorly supported rail joint. 2.2.1 Rail neutral temperature after installation of the plug rail The plug rail installed on 29 January 2020 was 1.5 inches shorter than the rail removed, even though the existing rail was already under a large amount of tensile stress, based on the fact that a 1.5-inch gap had occurred when the joint bar bolts were removed. The installation of the shorter rail resulted in an effective rail gap of 3 inches, which increased the rail neutral temperature (RNT) to 125 °F, significantly above the preferred rail laying temperature (PRLT) of 95 °F. An RNT of such a magnitude might provide a significant protection against track buckles in the summer but will increase the longitudinal stresses in the rail in cold weather, elevating the risk of a rail break or joint failure. Finding as to causes and contributing factors The installed plug rail was shorter than the rail removed, which raised the RNT significantly above the PRLT and increased the plug rail’s susceptibility to rail break or joint failure at low temperatures. 2.2.2 Maintenance records for the plug rail installation At the end of his shift, the foreman completed a continuous welded rail (CWR) maintenance form and left it at the supervisor’s office where the information pertaining to the plug rail
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 ■ 33
was later transferred to the Digital Track Notebook (DTN) database. The rail temperature recorded on the DTN database was 12 °F (−11 °C); the recorded ambient temperature was 23 °F (−5 °C). Given the conditions at the time of the occurrence, the rail temperature could only have been higher than the ambient temperature (sun effect), not lower, highlighting an inaccuracy with the data. The investigation revealed that the joint was under tension when the maintenance activities began and that more rail was removed than installed. The DTN database confirms that a gap of 1.5 inches developed at the joint when the joint bars were removed, and that 1.5 inches of rail was removed. This should lead to an effective rail gap of 3 inches, not the 1.5 inches recorded in the document. Consequently, the estimated RNT was shown as 91 °F instead of 125 °F. The investigation was unable to determine if the errors in the DTN database originated from the field (reading error, thermometer malfunction, CWR maintenance form improperly completed) or during the transfer from the CWR form to the DTN database. The DTN system would normally detect deviations of the RNT from the local PRLT and then alert the local engineering personnel to correct or destress the rail and adjust its RNT. Because the RNT was close to the local PRLT (91 °F vs 95 °F), the alert was not triggered; consequently, the erroneous rail temperature and effective rail gap were not identified. Finding as to risk If errors to critical information that affects the RNT (such as the rail temperature and effective rail gap at the time of installation) are not identified, there is an increased risk that conditions leading to a rail break or joint failure will exist. 2.3 Rail joint failure Bolted rail joints are discontinuities in track structure and are recognized as being weak locations in this structure. Their structural strength is affected by factors including the condition of the joint bars, the tightness of the bolts, and the quality of the joint support. A joint must be strong enough to withstand the combined effect of vertical loads (the loads imparted by passing rail cars) and longitudinal loads (the loads caused by train forces, for instance from traction or braking, and by thermal forces), otherwise the joint will fail. In some cases, failures can occur under the effect of thermal forces only, particularly at extreme temperatures. In the absence of adequate restraining support by the ballast, ties, and anchors, longitudinal forces built up within the rail are transmitted to the joint bars through the bolts and through the friction between the joint bars and the rail. The joint bars, the rail, and the bolts must therefore have sufficient resistance to withstand the longitudinal forces. When a bolted rail joint fails, the failure is typically attributable to one of the following causes:
• broken joint bar(s); • a broken rail; or • sheared bolts. In this occurrence, the joint at the west end of the 39-foot plug rail installed on 29 January 2020 was poorly supported. Although there was a low spot at that location, no shims had been placed. Also, as the plug rail was being restrained by a short length of track and relatively low number of anchors, the resisting force provided by the track structure was negligible. During the installation of the plug rail, the cut-out of 1.5 inches of rail had raised the RNT to 125 °F. An RNT of this magnitude is conducive to rail breaks and joint failures in cold weather, even in the absence of train loading. In support of this investigation, the TSB calculated the longitudinal thermal forces in the rail, taking into account this RNT value. The results indicate that, at −15 °C (the temperature at the time of the accident), the longitudinal thermal forces were 262 500 pounds; these forces were calculated to be 298 000 pounds on 04 February 2020 when the temperature was −24 °C (−11.2 °F). After the occurrence, the parent rail was not recovered, nor were the joint bars or the bolts used to connect the plug rail. It is therefore not possible to make a definitive assertion as to which joint component failed. However, given the calculated thermal forces, a comparison of the behaviour of the different joint components under only the effect of these forces should be sufficient to identify the component that was the most vulnerable, i.e., the most susceptible to fail under the effect of the combined vertical and longitudinal loads. The 3 possible scenarios are described below. 2.3.1 Broken joint bar(s) scenario The tensile load before failure of defect-free joint bars is 1 170 000 pounds of force, almost 4 times greater than the estimated thermal forces in the occurrence rail. For the joint failure to have been caused by broken joint bar(s), both joint bars at the west end of the plug rail installed on 29 January 2020 would have had to have had a defect. Although the joint bars were not recovered, they were visually inspected by the foreman before installation and no defects were discovered. Even though the inspection was carried out under unfavourable conditions, it is unlikely that broken joint bars led to the joint failure in this occurrence. 2.3.2 Broken rail scenario The tensile load that would have been required to cause the failure of defect-free 115- pound rail, such as the parent rail in the west side of the joint, is 1 598 900 pounds of force, almost 6 times greater than the estimated thermal forces in the rail at the time of the occurrence.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 ■ 35
The parent rail had received 7 rail flaw detection inspections in 2019, including the last one on 17 December 2019, and no defects were detected. Therefore, based on the available evidence, it is unlikely that the joint failed due to a broken rail. 2.3.3 Sheared joint bar bolts scenario The strength of a joint is strongly related to the condition of its bolts. When the bolts are tight, the longitudinal forces are absorbed by the resisting force of the joint bar friction and by the resisting force of the bolts (shear). However, once the bolts become loose, the resisting force of the joint due to friction disappears and the strength of the connection relies exclusively on the shear strength of the bolts. It is not uncommon for bolts to loosen. Newly installed bolts, even when adequately tightened, can lose from ¼ to ⅓ of their initial preload tension during the first month after their installation. Bolts on unsupported joints will loosen more rapidly. Temperature swings are also known to quicken the loosening of bolts in rail joints. In this occurrence, the joint at the west end of the plug rail was poorly supported, and significant temperature swings were observed in the area from the time of the joint’s installation to the time of the accident. It is therefore likely that the bolts were loose. The joint’s resistance was calculated to be approximately 342 000 pounds of force when the bolts were tight. With loose bolts, the joint’s resistance would be reduced to approximately 252 000 pounds of force (the shear strength of the bolts alone). Consequently, if the bolts were loose, the joint would not have been able to withstand the 262 500 pounds of thermal force that had developed in the rail on the day of the occurrence. The analysis of the 3 scenarios suggests that the most probable cause for the failure of the joint was the shearing of the bolts. Finding as to causes and contributing factors Poor joint support and temperature swings following the installation of the plug rail likely resulted in the loosening of the joint bar bolts. Once loosened, the bolts likely sheared and the joint failed, allowing the rail to contract under the longitudinal forces and create a rail gap. This gap led to the rail end impact by the wheel of the 28th car. Finding as to cause and contributing factors The likely shearing of the loose joint bar bolts resulted in the failure of the joint and a gap in the rail, leading to the derailment of the train. 2.4 Vertical rail head and bolt hole cracking The west end of the plug rail installed on 29 January 2020 exhibited a vertical head crack consistent with either a VSJ (vertical split head joint area) or a shear break defect. A 5-inch portion of the head was missing on the gauge side and the remaining head on the field side
of the rail had batter caused by wheel impact. This defect is not considered to be a causal factor in the derailment as the presence of rail batter on the remaining portion of the plug rail head indicated that the rail gap occurred at the plug rail joint. The 28th car had an impact mark on its north-side wheel that began at the flange and extended perpendicular across the wheel tread for about 2¼ inches, which matches the width of a 115-pound rail head. Therefore, it is likely that the end of the rail was still intact when it was struck by the wheel of the 28th car. This is further confirmed by the absence of impact marks on the fracture surface of the gauge side of the plug rail. Finding: Other The VSJ/shear break identified after the derailment on the plug rail installed on 29 January 2020 was caused by impact from the occurrence train’s wheels after the development of the rail gap when the joint failed. The TSB laboratory examination of the bolt hole crack did not reveal signs of fatigue and could not determine with certainty if the fracture occurred before the derailment or as result of it. 2.5 Plug rail inspection Section 6 of CP’s Red Book specifies the requirements for rail reuse, according to the volume of traffic that passed over the rail. For instance: • Rail over which 10 MGT or less traffic has run over since the rail was last ultrasonically tested is to be marked with the letters UTV (for ultrasonic test verified) • Rail over which more than 10 MGT traffic has run over since the rail was last ultrasonically tested, or rail that has not been tested, is not to be installed before testing. Once ultrasonically tested, the rail will be marked with the letters UTT (for ultrasonic test tested) The plug rail installed on 29 January 2020 was UTT marked, which indicated that it was ultrasonically tested and had not received any traffic from the time it was tested until its re- installation. This measure reduces substantially the risks of re-introducing defective rails in the track. CP recognizes the value of frequent rail flaw testing, particularly during the colder winter months when rail is more brittle and susceptible to defect growth. For the Sutherland Subdivision, CP exceeded the TSR minimum requirement of 3 rail flaw detection inspections annually. In 2019, CP conducted 7 rail flaw detection inspections on the subdivision. That is equivalent to testing every 3.7 MGT, on average.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 ■ 37
The mitigation strategy adopted by CP to reduce rail breaks has yielded substantial safety benefits and has led to a steady decline in the defect rate per mile.54 However, the provisions under Section 6 of the Red Book do not conform with this strategy since they allow the use of rails that had up to 10 MGT since their previous inspection, i.e., UTV rails. On the Sutherland Subdivision, for instance, if a UTV plug rail is installed immediately after the passage of the testing vehicle, it would next be tested after a total of 13.7 MGT of traffic. Consequently, the practice of using UTV rails will likely lead to the introduction of undetected defects and increase the risks of rail breaks. Finding as to risk The practice of using UTV rails increases the risk of installing plug rails with undetected defects, which could lead to rail breaks. 2.6 Tank car performance The train speed, the number of tank cars derailed, and some of the tank car damage observed in this occurrence were similar to other major accidents involving crude oil unit trains that the TSB has investigated. The train was designated as a key train operating on a key route and was proceeding at 44 mph when it derailed 32 DOT-117J tank cars, releasing about 1.75 million L of crude oil. Examination of the derailed cars suggests that the extent of damages sustained by the tank cars was likely attributed to the speed of the train and the mechanism of derailment (i.e., failed rail joint). Similar to previous major accidents involving crude oil trains investigated by the TSB, the derailment area consisted of 3 major zones, with the 2nd zone likely influenced by the Bloomfield Road crossing. The Bloomfield Road crossing caused the derailed cars to be clustered together over a relatively short area instead of spreading out eastward; the clustering of the cars intensified the damages as the crude oil from the breached cars fed the fire. Finding as to causes and contributing factors The speed of the train (44 mph), the mechanism of derailment, and the presence of a crossing contributed to the number of cars derailed and to the clustering of those cars, increasing the overall severity of the derailment. The performance of the DOT-117J tank cars involved in the derailment was difficult to assess due to the extensive fire and the remediation and fire damage that occurred after the derailment. While there was a significant number of breached tank cars, identifying the exact breach areas and mechanisms was not possible.
54 Rail Transportation Safety Investigation Report R21S0048.
Finding: Other The performance of the DOT-117J tank cars involved in the derailment was difficult to assess due to the extensive remediation and fire damage that occurred after the derailment. Remediation activities contributed to some of the damages that were observed on the tank cars. During the emergency response and fire-fighting activities, derailed tank cars were moved by heavy equipment in order to mitigate and extinguish the fire. Most of the derailed tank cars (30 out of 32) were observed to have lost some product. Nine had lost their entire load and 11 more lost at least half their load; all these tank cars were concentrated in the main pile-up. The railway bed, the Bloomfield Road crossing, and the adjacent highway were slightly elevated, thus creating 2 depression areas between the track and the highway where the released product accumulated, aggravating the size and intensity of the pool fire. Finding as to causes and contributing factors The topographical depressions of the site caused the released product to accumulate, increasing the size and intensity of the pool fire.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 ■ 39
- 0
FINDINGS 3.1 Findings as to causes and contributing factors These are conditions, acts or safety deficiencies that were found to have caused or contributed to this occurrence.
- The west joint of a plug rail, located at Mile 43.66 of the Sutherland Subdivision and
installed on 29 January 2020 (8 days prior to the occurrence) most likely failed under the 28th car of Canadian Pacific Railway Company train 516-380, causing the train to derail after the passage of the 30th car.
- The plug rail installation was executed by a winter utility team that did not routinely
replace rail and was performed under demanding working conditions, both of which likely contributed to the installation of a poorly supported rail joint.
- The installed plug rail was shorter than the rail removed, which raised the rail neutral
temperature significantly above the preferred rail laying temperature and increased the plug rail’s susceptibility to rail break or joint failure at low temperatures.
- Poor joint support and temperature swings following the installation of the plug rail
likely resulted in the loosening of the joint bar bolts.
- The likely shearing of the loose joint bar bolts resulted in the failure of the joint and a
gap in the rail, leading to the derailment of the train.
- The speed of the train (44 mph), the mechanism of derailment, and the presence of a
crossing contributed to the number of cars derailed, and to the clustering of those cars, increasing the overall severity of the derailment.
- The topographical depressions of the site caused the released product to accumulate,
increasing the size and intensity of the pool fire. 3.2 Findings as to risk These are conditions, unsafe acts or safety deficiencies that were found not to be a factor in this occurrence but could have adverse consequences in future occurrences.
- If errors to critical information that affects the rail neutral temperature (such as the
rail temperature and effective rail gap at the time of installation) are not identified, there is an increased risk that conditions leading to a rail break or joint failure will exist.
- The practice of using ultrasonic test verified rails increases the risk of installing plug
rails with undetected defects, which could lead to rail breaks.
- 3
Other findings These items could enhance safety, resolve an issue of controversy, or provide a data point for future safety studies.
- Although the tank cars had been subjected to a pool fire that burned for approximately
19 hours, no thermal tears were observed.
- The amendment of the Rules Respecting Key Trains and Key Routes to include a
procedure for the installation and inspection of joint bars and plug rails is a positive step to reduce the risks of rail joint failures.
- The vertical split head joint area / shear break identified after the derailment on the
plug rail installed on 29 January 2020 was caused by impact from the occurrence train’s wheels after the development of the rail gap when the joint failed.
- The performance of the DOT-117J tank cars involved in the derailment was difficult to
assess due to the extensive remediation and fire damage that occurred after the derailment.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 ■ 41
- 0
SAFETY ACTION 4.1 Safety action taken On 09 December 2019, less than 2 months before the accident, another unit train of crude oil derailed only 5 miles to the west of this derailment near Guernsey, Saskatchewan, on the Sutherland Subdivision, resulting in a large amount of crude oil being lost and a pool fire that engulfed many of the derailed cars.55 There were many similarities between the December 2019 derailment and this derailment, including the train make-up, their geographical proximity, the speed at which the trains were travelling, the length of the trains, the number of cars derailed, the amount of product lost, the post-derailment fires, the ambient temperature at which they occurred, and the cause of the derailments (broken rail/rail joint failure). Following these 2 accidents, substantial safety action was taken by the various stakeholders. 4.1.1 Transportation Safety Board of Canada Following this accident and an earlier serious Canadian Pacific Railway Company (CP) crude oil unit train derailment that occurred about 5 miles to the west on the Sutherland Subdivision on 09 December 2019 (TSB Occurrence R19W0320), the TSB issued rail safety advisories (RSA) 02/20 and 03/20 to Transport Canada (TC). The RSAs noted that, since 2015, including this accident, the TSB had deployed to 7 train derailments involving tank cars that were transporting crude oil, 6 of which resulted in a significant release of product. A review of the 7 accidents revealed the following: • All 7 derailments occurred on a key route on which the track was maintained in accordance with the standards outlined in the Rules Respecting Track Safety for Class 3 or 4 track. • All 7 derailments occurred as a result of a broken rail, broken joint bars, or other track infrastructure condition. • For 6 of the 7 cases: • Train speed ranged from 38 mph to 49 mph. • Between 29 and 39 tank cars loaded with petroleum crude oil derailed. • A total of 8.43 million L of petroleum crude oil was released. • The derailment occurred during the winter months.
55 TSB Rail Transportation Safety Investigation Report R19W0320.
- 1.1.1
Rail Safety Advisory 02/20 – Modifying key train speed based on various train risk profiles In RSA 02/20, the TSB indicated that train speed is one of the primary factors that contributes to the severity of a derailment. However, other factors such as train length, train weight, the position of the first car(s) derailed, the position of the cars in the train, and tank car design also play a role. The RSA suggested that, to reduce the frequency of these accidents and the commensurate risk to the public, property, and the environment, TC should further review and modify key train speeds, as appropriate, based on various train risk profiles while also considering other factors that influence the severity of a derailment. 4.1.1.2 Rail Safety Advisory 03/20 – Enhanced track standards for key routes In RSA 03/20, the TSB noted that, as train operations have evolved, the TSR have not kept pace. The current TSR came into force on 25 May 2012, almost 4 years before the TC- approved Rules Respecting Key Trains and Key Routes came into force in February 2016. While the TSR establish minimum standards for track infrastructure, there are no provisions in the TSR to address the need for enhanced track standards for key routes despite sometimes significant increases in dangerous goods traffic volumes on these routes. To reduce the frequency and mitigate the risks associated with accidents involving key trains on key routes, it is imperative that the track infrastructure be adequately maintained. Considering that the underlying causes of the 7 accidents identified were all related to failures of the track infrastructure, TC was advised that the current TSR do not address the increased risks associated with the operation of key trains. The TSB suggested that TC consider revising the TSR to include enhanced track standards for key routes. 4.1.2 Transport Canada 4.1.2.1 Revision of the Rules Respecting Key Trains and Key Routes In response to RSA 02/20, TC issued a number of ministerial orders (MO), including the following. 4.1.2.1.1 Ministerial Order MO 20-05 issued pursuant to section 32.01 of the Railway Safety Act On 01 April 2020, TC issued MO 20-05, which indicated that, pursuant to the provisions of section 32.01 of the Railway Safety Act, federally regulated railway companies were ordered to implement additional safety measures for key trains. The MO identified that there were a number of recent derailments of trains transporting dangerous goods that resulted in the breach of tank cars and the release of dangerous goods, including the Canadian National Railway Company (CN) St. Lazare derailment in Manitoba in 2019, and the 2 CP derailments on the Sutherland Subdivision in Saskatchewan in 2019 and 2020 (this occurrence), respectively. Federally regulated railways were ordered to implement an additional definition for a higher-risk key train, which was defined as an engine with cars that include loaded tank cars carrying crude oil or liquefied petroleum gases, as defined in the Transportation of
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 ■ 43
Dangerous Goods Act, 1992, in a continuous block of 20 or more tank cars, or 35 or more tank cars dispersed through a train. The MO also included additional speed restrictions, requirements for continuous welded rail (CWR) joint management, and requirements for installing replacement (plug) rail. MO 20-05 was effective immediately, with the exception of the requirements for CWR joint management and installing replacement (plug) rails, which were planned to come into effect on 01 September 2020. This MO remained in effect until the Minister approved the revised Rules Respecting Key Trains and Key Routes that incorporated the above measures on a permanent basis. 4.1.2.1.2 Ministerial Order MO 20-06 issued pursuant to section 19 of the Railway Safety Act On 01 April 2020, TC issued MO 20-06 pursuant to the provisions of paragraph 19(1)(a) of the Railway Safety Act. The MO ordered federally regulated railway companies to revise the Rules Respecting Key Trains and Key Routes. The MO required that revised rules be based on an assessment of safety risk and, at a minimum, incorporate the following: • new definitions, including the definition for “higher-risk key trains,” which is to be defined as “an engine with cars that include loaded tank cars carrying crude oil or liquefied petroleum gases, as defined in the Transportation of Dangerous Goods Act, 1992, in a continuous block of 20 or more tank cars, or 35 or more tank cars dispersed through a train;” • additional speed restrictions; • requirements for CWR joint management; and • requirements for installing replacement (plug) rail. The MO required that railways file the revised Rules Respecting Key Trains and Key Routes with the Minister of Transport for approval within 210 days of the date that the MO was issued. 4.1.2.1.3 Ministerial Order MO 20-10 issued pursuant to section 32.01 of the Railway Safety Act, M2O-05 repealed On 06 November 2020, TC issued MO 20-10 pursuant to the provisions of section 32.01 of the Railway Safety Act. With the issuance of MO 20-10, MO 20-05 was repealed, and federally regulated railway companies were ordered to implement additional safety measures for key trains, which included the following: • Part I: Additional key train speed restrictions when a winter operation risk mitigation plan is not in place • Part II: Requirement for CWR Joint Management • Part III: Requirement for installation of replacement (plug) rail
• Part IV: Key train speed restrictions with a winter operation risk mitigation plan in place • Part V: Requirements for winter operation risk mitigation • Part VI: Requirements for Rail Break Detection Technology This order was effective immediately and remained in effect until the Minister approved the revised Rules Respecting Key Trains and Key Routes that incorporated the above measures on a permanent basis. 4.1.2.1.4 Revised Rules Respecting Key Trains and Key Routes On 22 February 2021, TC approved the revised Rules Respecting Key Trains and Key Routes submitted by the industry. The revised rules came into effect on 22 August 2021.56 The revised rules • require companies to develop and adhere to a maintenance and inspection plan for permanent rail joints and temporary rail joints in CWR; • The inspection plan is to include time limits for the retention of temporary rail joints until permanently repaired, as well as the requirement for records detailing the location, as well as the installation, inspection, and maintenance dates, of temporary rail joints. • restrict the maximum operating speed of key trains in census metropolitan areas (CMAs); • define higher-risk key trains as those trains that include loaded tank cars carrying crude oil or liquefied petroleum gases in a continuous block of 20 or more tank cars or 35 or more tank cars dispersed through a train; • further restrict the maximum operating speed of higher-risk key trains, when compared to key trains operating both within and outside of CMAs; • contain new requirements for Winter Operation Risk Mitigation Plans; • restrict operating speeds for higher-risk key trains for railway companies without Winter Operation Risk Mitigation Plans; • contain specific requirements for broken rail detection technology; and • require a company to ultrasonically inspect and confirm that replacement rail is free from rail defects prior to being put in service. When ultrasonic inspection of the replacement rail cannot be done prior to installation, a company must, until the replacement rail has been ultrasonically inspected and verified to be free of defects, either: i) Limit the maximum speed to 10 MPH; or ii) Implement a speed restriction reviewed and approved by a professional engineer.
56 Rules Respecting Key Trains and Key Routes (approved by Transport Canada 22 February 2021), sections 3, 4, and 5, pp. 3–9.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 ■ 45
- 1.2.2
Revision of the Rules Respecting Track Safety In response to RSA 03/20, TC issued MO 20-07. 4.1.2.2.1 Ministerial Order MO 20-07 issued pursuant to section 19 of the Railway Safety Act On 01 April 2020, TC issued MO 20-07, which indicated that, pursuant to the provisions of paragraph 19(1)(a) of the Railway Safety Act, federally regulated railway companies were ordered to revise the TSR. The revised TSR should be based on an assessment of safety risks, track-related derailment causes, evolving technology, current railway internal standards, and industry best practices, and shall, at a minimum, address the following elements in 3 phases: Phase 1 elements • Training, qualification, and quality assurance • CWR management • Track geometry • Rail wear management • Rail surface management Phase 2 elements • Track inspection frequency • Automated track inspection technology Phase 3 – Structures / Other elements • Requirement for concrete ties • Requirement for inspection of yard tracks over which passenger equipment carrying passengers operates • Requirements to develop and report on key track performance indicators • Requirement to file with TC the most recent version of company track standards The dates for filing the revised TSR with the Minister were 01 April 2021 (Phase 1), 01 October 2021 (Phase 2), and 01 April 2022 (Phase 3). On 31 May 2021, TC approved the Phase 1 revisions to the TSR. Part I, section 9, items b) through f) of the revised TSR include quality assurance requirements for safety-critical maintenance and repair activities.57 The list of safety-critical maintenance and repair activities for key routes must be approved by a professional engineer. These quality assurance requirements are expected to decrease the likelihood of derailments resulting from repair and maintenance activities that are inconsistent with the railway company’s standards and procedures.
57 Rules Respecting Track Safety (01 February 2022, approved by Transport Canada 15 December 2021), Section 9: Track Maintenance and Repair Work, pp. 9-10.
Part II, Subpart D, section IX of the revised TSR includes requirements for CWR Management Plans that contain comprehensive installation, inspection, and maintenance requirements.58 The revised TSR also include requirements for railway companies to prepare and adhere to Track Geometry Management Plans, Rail Surface Management Plans, and Rail Wear Management Plans. Track Geometry Management Plans for key routes must include instructions for monitoring and taking appropriate measures for geometry conditions approaching the limits prescribed under the TSR. As of 31 May 2023, all 3 phases have been completed and are in effect. 4.1.2.3 Publication of the Guideline for the use of rail previously in service as replacement rail On 17 November 2020, TC communicated to industry the Guideline for the use of rail previously in service as replacement rail, which provides railways with recommended elements to consider in the development of internal procedures regarding the use of a rail previously in service as a replacement rail. This guideline has been posted on TC’s website.59 4.1.3 Canadian Pacific In response to rail breaks that have occurred on subdivisions governed by the occupancy control system, CP has implemented its own wayside system for the detection of track discontinuities in non-signalled territory. The system can detect broken rails and indicate the presence of trains. It works by sending a low-voltage signal through the rails and relies on technology found in other industries, such as solar cells, lithium ion batteries, and miniaturized signal-processing circuits. Territory equipped with this system would still be considered dark territory. Since the occurrence, CP has added 2 more autonomous track geometry measuring systems and is building another one, which will bring the total to 5. A summary of the track work conducted by CP on the Sutherland Subdivision in 2020 is contained in Table 2 below: Table 2. Summary of track work conducted by Canadian Pacific on the Sutherland Subdivision in 2020 (Source: Canadian Pacific) Track work Units 2020 New rail/relay rail miles 19.73 Ties replaced each 76 086 Joint elimination each 845
58 Ibid., Part II, Subpart D, Section IX: Continuous Welded Rail (CWR), p. 28. 59 Transport Canada, Guideline for the use of rail previously in service as replacement rail, at https://tc.canada.ca/en/rail-transportation/guidelines/guideline-use-rail-previously-service-replacement-rail (last accessed on 25 April 2024).
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 ■ 47
Track work Units 2020 Turnouts installed each 10 Track surfacing feet 441 651 At September 2023, there had been no main-track derailments on the CP Sutherland Subdivision since CP completed the track work. This report concludes the Transportation Safety Board of Canada’s investigation into this occurrence. The Board authorized the release of this report on 22 May 2024. It was officially released on 07 June 2024. Visit the Transportation Safety Board of Canada’s website (www.tsb.gc.ca) for information about the TSB and its products and services. You will also find the Watchlist, which identifies the key safety issues that need to be addressed to make Canada’s transportation system even safer. In each case, the TSB has found that actions taken to date are inadequate, and that industry and regulators need to take additional concrete measures to eliminate the risks.
APPENDICES Appendix A – Rail joint strength and rail thermal stress calculations Rail strength New defect-free 115-pound rail has a cross-sectional area of 11.22 inches2. Its tensile strength is 142 500 psi60 and its corresponding tensile load before failure is approximately 1 598 900 pounds of force. Joint bar strength New defect-free joint bars have a gross area of 10.7 inches2 or a net area of 9.36 inches2 when used with 1-inch-diameter bolts. Their tensile strength is 125 000 psi61 and the corresponding tensile load before failure is 1 170 000 pounds of force. Connection strength The resisting force of a joint connection is the sum of the holding forces provided by the anchors, the lateral shear in the bolts, and the friction between the surfaces of the joint bars and the rail. Fresisting = Fanchors + Fbolts + Ffriction The holding force of the anchors Fanchors was negligible62 in this occurrence, considering the number of anchors over the plug rail length and their reduced clamping force (re-used several times). The standard bolts used with joint bars for 115-pound rail have a diameter of 1 inch and are made of Grade 5 steel. They have a minimum tensile strength of 72 700 pounds of force63 and a minimum shear strength of 42 000 pounds of force (Von Mises Criteria 0.578 of the tensile strength). The bolts in this occurrence were in double shear; hence, they could withstand a shear force of 84 000 pounds each (2 x 42 000 pounds each). The maximum shear resistance of the 3 bolts (west side of the joint bars) was Fbolts = 252 000 pounds of force.
60 American Railway Engineering and Maintenance-of-Way Association (AREMA), Manual for Railway Engineering (2014), Volume 1, Chapter 4, Part 2, Table 4-2-1-4-2c: Tensile Properties Table for Low Alloy Rail Steel 61 Ibid., Part 3, Section 3.2, Figure 4-3-2: Joint bar assembly for 115 and 119 RE rail. 62 While the holding power of the anchors is important in restraining the rail, it also depends on the condition of the system (ties, ballast, the length of rail being restrained). The restraining capability of the system is commonly estimated to be 600 pounds per foot of restrained rail (Dr. A. Kerr, Fundamentals of Railway Engineering). 63 AREMA, Manual for Railway Engineering (2014), Volume 1, Chapter 4, Part 3, Section 3.5, Table 4-3-7: Proof Load and Tensile Strength Requirements.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 ■ 49
The friction force is the friction resistance at the interface between the joint bars and the rail. This friction exists when the bolts are tight (the transfer of longitudinal forces from the rail to the joint bars has to overcome the effect of the clamping force provided by the bolts). When tight, each bolt in the occurrence joint would exert a clamping force on the bars of 20 000 pounds to 30 000 pounds (preload force). Therefore, the clamping force applied to one side of the joint would total 90 000 pounds (3 x 30 000 pounds). In normal conditions, this clamping force declines rapidly following the installation (loss of 5000 pounds to 10 000 pounds during the first month64) but if the joint is poorly supported, the bolts will loosen more rapidly and the force can totally disappear. The friction force depends on the static coefficient of friction between the rails and the bars (steel on steel), which varies from 0.4 to 0.6 or an average value of 0.5. Therefore, Ffriction = 90 000 pounds of force (2 x 90 000 x 0.5). As soon as the bolts loosen, the friction disappears, and the entire thermal forces are taken only by the bolts. Therefore, the resisting force for the west joint of the plug rail installed on 29 January 2020 corresponds to the following: • If the bolts were tight: Fresisting = Ffriction + Fbolts = 342 000 pounds • If the bolts were loose: Fresisting = Fbolts = 252 000 pounds Thermal forces The thermal forces in a rail are expressed in pounds and obtained by the following equation: Fthermal = 𝞼𝞼 x A where 𝞼𝞼 is the stress caused by temperature changes, and A is the rail area (for 115-pound rail, A = 11.22 in2) The stress caused by temperature changes is, in turn, given by the following equation: 𝞼𝞼 = α x E x ΔT where 𝞼𝞼 is the stress, in psi, α is the coefficient of thermal expansion (α = 6.5 x 10-6 in / in °F),65
64 Ibid., Chapter 5, Part 5, Section 5.5: Track Bolt Tension Practice. 65 Canadian Pacific Railway Company, Red Book of Track & Structures Requirements, (revised 28 October 2019), Appendix 2 – Rail Movement for Different Temperature Differentials.
E is the modulus of elasticity (E=30 x 106 psi),66 and ΔT is the change in temperature (ΔT=°F). For a rail neutral temperature of 80 °F (22-foot plug rail installed on 14 January): At −15 °C (5 °F)—the temperature at the time of the accident: • ΔT = 75, • 𝞼𝞼 = 14 625 psi, and • Fthermal ≈ 164 100 pounds At −24 °C (−11.2 °F)—the temperature on 04 February: • ΔT = 91.2, • 𝞼𝞼 = 17 780 psi, and • Fthermal ≈ 199 500 pounds For a rail neutral temperature of 125 °F (39-foot plug rail installed on 29 January): At −15 °C (5 °F)—the temperature at the time of the accident: • ΔT = 120 • 𝞼𝞼 = 23 400 psi, and • Fthermal ≈ 262 500 pounds At −24 °C (−11.2 °F)—the temperature on 04 February: • ΔT = 136.2, • 𝞼𝞼=26 560 psi, and • Fthermal ≈ 298 000 pounds Conclusions The resisting force of the connection and the strength of the bars must be higher than the thermal force in the rail in order to avoid a joint failure: Fresisting ≥ Fthermal For the 22-foot plug rail installed on 14 January 2020, the joint strength would have been adequate to overcome the thermal force even with loose bolts. For the 39-foot plug rail installed on 29 January 2020, the joint resistance was adequate with tight bolts but insufficient with loose bolts.
66 W.W. Hay, Railroad Engineering, Second Edition (1982), John Wiley & Sons, Chapter 24, p. 485.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 ■ 51
Appendix B – Features and appurtenances of DOT-117J100-W tank cars DOT-117J100-W (DOT-117J) tank cars are non-pressurized tank cars, jacketed, and have an insulating material providing thermal protection. They are designed with various features and appurtenances for loading and unloading and to protect against release of product in the event of a derailment, including top fittings protection, full head shields, and disengaging bottom outlet valve handles. Jacket DOT-117J tank car jackets encase the tank shell, heads, and insulating material. Jackets are ⅛ inch thick and are made of steel that meets the American Society for Testing and Materials (ASTM) specification 1011 (or equivalent). Thermal protection Between the exterior jacket and inner tank shell is an insulating material providing thermal protection. This layer must be able to withstand a pool fire for 100 minutes, and direct flame impingement (torch fire) for 30 minutes, with no release of lading other than from the pressure relief device. Shell DOT-117J tank car shells are made of TC128 Grade B normalized steel,67 with a thickness of 9/16 inch. Using normalized steel improves the toughness and ductility of the material, providing increased fracture resistance. Protective housing for top fittings A protection housing is equipped and encloses the top shell service equipment (valves, accessories) and the pressure relief device for protection against rollovers and accidental horizontal loads. This protective housing is attached to the car by threaded studs. Head shields Head shields help protect the head of the tank car from puncture. They are made of ½-inch- thick structural steel. Full-height head shield protection covers the entire tank head and is required for DOT-117J tank cars. Skid protection DOT-117J tank cars are also equipped with skid protection to protect bottom appurtenances that project beyond the shell, such as bottom outlet valves. Bottom outlet
67 The process of normalizing consists of reheating the steel above the critical temperature to form austenite followed by air cooling through the phase transformation. Normalized steel has a refined grain structure, improved resistance to brittle failure, and lower ductile-brittle transition temperature.
valve handles, unless stowed separately, are designed to bend, break free, or be protected on impact, without the valve opening.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R20W0025 ■ 53
Appendix C – Tank car breaches Car position in train from head end Reporting mark Type of breach 31 CBTX 721359 Bottom outlet valve 32 CBTX 721341 Top fittings and pressure relief device 33 CBTX 721334 No breach 34 CBTX 721340 Shell 35 CBTX 721249 Shell, top fittings and pressure relief device 36 CBTX 721360 Loss of containment with an unconfirmed breach location 37 CBTX 721344 Top fittings and pressure relief device* 38 CBTX 721354 Loss of containment with an unconfirmed breach location 39 CBTX 721337 Top fittings and pressure relief device 40 CBTX 721363 Top fittings and pressure relief device 41 CBTX 721291 Loss of containment with an unconfirmed breach location 42 CBTX 721267 Top fittings and pressure relief device* 43 CBTX 721367 Top fittings and pressure relief device, manway 44 CBTX 721281 Head, shell, top fittings and pressure relief device 45 CBTX 721221 Head, top fittings and pressure relief device 46 CBTX 721232 Loss of containment with an unconfirmed breach location 47 CBTX 721187 Shell,* top fittings and pressure relief device, bottom outlet valve 48 CBTX 721212 Head, shell, top fittings and pressure relief device, manway* 49 CBTX 721206 Shell, top fittings and pressure relief device 50 CBTX 721286 Shell, top fittings and pressure relief device 51 CBTX 721253 Bottom outlet valve* 52 CBTX 721222 Head,* shell 53 CBTX 721196 Head,* shell 54 CBTX 721209 Top fittings and pressure relief device* 55 CBTX 721201 Shell, top fittings and pressure relief device 56 CBTX 721190 Bottom outlet valve* 57 CBTX 721185 Manway, bottom outlet valve* 58 CBTX 721208 Head,* shell 59 CBTX 721308 Loss of containment with an unconfirmed breach location 60 CBTX 721298 Head* 61 CBTX 721296 Loss of containment with an unconfirmed breach location
- Likely breach location.
FD06113 | 2020_加拿大运输安全委员会_CP原油单元列车脱轨池火_R20W0025_火灾报告(英文).md
分类:06_境外及港澳台调查报告 | 年份:2020 | 地域: | 严重程度: | 场所:交通/车辆 | 起火原因:燃气/爆炸 | 来源格式:md
1. 报告标题与报告编号
- 标题:Rail transportation safety investigation report R20W0025
- 报告编号:R20W0025
2. 机构与发布日期
- 机构:Transportation Safety Board of Canada(TSB)
- 授权发布:2024 年 5 月 22 日;正式发布 2024 年 6 月 7 日
3. 事故摘要
- 日期:2020 年 2 月 6 日(约 0400 发车,0606 脱轨)
- 地点:Mile 43.66, Sutherland Subdivision, Guernsey, Saskatchewan(靠近 Bloomfield Road 平交道口)
- 事件:Canadian Pacific 货运列车 516-380(运载石油原油的单元列车,UN1267, Class 3, Packing Group I)向东行驶,时速约 44 mph。列车触发紧急制动,检查发现 32 辆 DOT-117J100-W 罐车脱轨,摧毁约 300 英尺轨道。30 辆脱轨罐车泄漏约 175 万升原油,随后发生火灾(A fire ensued)。约 85 名格恩西居民疏散,16 号公路关闭,无人受伤。
4. 原因 / 因果因素
- 位于 Sutherland 分区 43.66 英里、2020-01-29 安装(事发前 8 天)的 插轨西接头(plug rail west joint) 最可能在 CP 516-380 列车第 28 辆车通过时失效,导致第 30 辆车通过后列车脱轨。
- 插轨由冬季作业队安装,该队不常更换钢轨,且在苛刻工作条件下进行,可能导致接头支撑不良。
- 所装插轨比拆下钢轨短,使钢轨中性温度显著高于宜铺轨温,增加低温下断轨或接头失效敏感性。
- 插轨安装后支撑不良与温度波动可能导致接头夹板螺栓松动。
- 松动的接头夹板螺栓剪切断裂导致接头失效与钢轨缺口,致使列车脱轨。
- 车速(44 mph)、脱轨机理及平交道口存在,增加了脱轨车辆数与聚集度,扩大事故严重度。
- 现场地形凹陷使泄漏油品积聚,增大池火规模与强度。
5. 安全发现
- 若影响钢轨中性温度的关键信息(安装时轨温与有效轨缝)错误未被识别,存在增加断轨或接头失效条件风险。
- 使用超声检测验证(UTV)钢轨增加安装带未检出缺陷插轨的风险,可能导致断轨。
- 尽管罐车经历约 19 小时池火,未观察到热撕裂。
- 修订《关键列车与关键路线规则》纳入接头夹板与插轨安装检查程序,是降低接头失效风险的积极一步。
6. 安全建议 / 纠正行动
- TSB 铁路安全建议 (RSA):
- RSA 02/20:建议 TC 基于不同列车风险状况修订关键列车速度限制。
- RSA 03/20:建议 TC 修订《轨道安全规则》纳入关键路线的增强轨道标准。
- TC 部长令与规则修订:MO 20-05/20-10(更高风险关键列车定义、限速、CWR 接头管理、插轨安装等);MO 20-06/20-07(修订关键列车/关键路线规则及轨道安全规则);修订后《Rules Respecting Key Trains and Key Routes》(2021-08-22 生效) 要求永久/临时钢轨接头维护检查计划、CMA 内限速、更高风险关键列车定义、冬季风险缓解计划与断轨检测技术、替换轨安装前超声检测;修订后《Rules Respecting Track Safety》三阶段完成(CWR 管理、几何/磨损/表面管理、质量保证);发布《Guideline for the use of rail previously in service as replacement rail》(2020-11-17)。
- CP 行动:实施基于非信号区轨道间断检测的路边系统;增购自主轨道几何测量系统(ATGMS)至 5 台;2020 年 Sutherland 分区完成轨道翻新(新轨 19.73 英里、换枕 76086 根等),此后无主轨脱轨。
FD06114 | 2021_加拿大_TSBC_A21C0052_Aviation_Pipeline_Inspection_Fire_2021.pdf
分类:06_境外及港澳台调查报告 | 年份:2021 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
AIR TRANSPORTATION SAFETY INVESTIGATION REPORT A21C0052 LOSS OF CONTROL AND COLLISION WITH TERRAIN Helicopter Transport Services (Canada) Inc. Bell 214ST (helicopter), C-GDYZ Nipigon, Ontario, 14 NM NE 07 June 2021 The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. This report is not created for use in the context of legal, disciplinary or other proceedings. See the Terms of use at the end of the report. History of the flight At 16401 on 07 June 2021, the Helicopter Transport Services (Canada) Inc. (HTSC) Bell 214ST helicopter (registration C-GDYZ, serial number 28109) with only the pilot on board departed from the Nipigon, Ontario, fire base on a forest-fire suppression flight to wildfire Nipigon 8, located approximately 28 nautical miles northeast of Nipigon. The pilot was flying the helicopter from the left seat and was wearing a lap belt and helmet. The aircraft was equipped with a 550-gallon collapsible water bucket on a 150-foot long line. The pilot conducted approximately 45 drops before informing the fire boss on board the bird dog/spotter aircraft that the helicopter was low on fuel and that the end of his duty day was nearing. The return trip from Nipigon 8 to the Nipigon fire base was flown at 3000 feet above sea level, about 1600 feet above ground level. The helicopter was travelling at 70 to 74 knots in a nose-down attitude
1 All times are Eastern Daylight Time (Coordinated Universal Time minus 4 hours).
TRANSPORTATION SAFETY BOARD OF CANADA ■ 2
of roughly 7° due to the empty water bucket when the pilot was alerted by a vibration in the tail rotor pedals and a grinding noise. Moments later, the 42° BOX OIL PRESS and 90° BOX OIL PRESS annunciators for the 2 tail rotor gearboxes illuminated, and there was an audible engine overspeed noise. The helicopter yawed to the right and the nose began to pitch down. The pilot lowered the collective control and moved the cyclic control aft to counteract the nose-down tendency, increase the main rotor rpm, and enter autorotative flight. As the helicopter began to spin, the pilot released the long line and water bucket by kicking the manual cargo release pedal. The pilot transmitted a Mayday call on the enroute frequency (126.7 MHz) and informed other aircraft working on the same fire that he had lost tail rotor control. While the helicopter was descending at approximately 1000 to 1500 fpm, the pilot made 3 attempts to use some engine power to fly the helicopter to a suitable landing area near a small lake. He was able to regain some control over the adverse yaw via airflow acting on the vertical stabilizer. As the helicopter descended below treetop height, he raised the collective control to cushion the landing, at which point the low rotor rpm horn activated. At 1924, the helicopter landed on its left skid gear with almost no forward speed (Figure 1). The emergency locator transmitter activated automatically and there was no fire. The helicopter was substantially damaged. The pilot shut down the engines and electrical systems and was able to climb out of the right-side cockpit door. Another helicopter with fire fighters on board responded to the Mayday call and, within a few minutes, landed near the accident site. The seriously injured pilot was transported directly to a hospital in Thunder Bay, Ontario.
AIR TRANSPORTATION SAFETY INVESTIGATION REPORT A21C0052 ■ 3
Figure 1. The occurrence aircraft during recovery preparations (Source: TSB)
Pilot information The pilot held a valid airline transport pilot licence - helicopter endorsed for numerous helicopter types, including the Bell 214ST. He had accumulated approximately 8400 hours total flying time, roughly 1940 of which were on the Bell 214ST. The investigation determined that the occurrence pilot met the recency requirements for the flight in accordance with existing regulations. A review of the pilot’s work and rest schedule indicated that fatigue was likely not a factor in this occurrence. Aircraft information The Bell 214ST is a twin-engine, single 2-bladed rotor helicopter. The helicopter had no known deficiencies before the occurrence flight.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 4
Table 1. Aircraft details Manufacturer Bell Helicopter Textron Type, model and registration Helicopter, Bell 214ST, C-GDYZ Year of manufacture 1982 Serial number 28109 Total airframe time Approximately 20 216 hours Engine model (number of engines) General Electric CT7-2A (2) Maximum allowable take-off weight 7937.87 kg Recommended fuel types Jet A, Jet A-1, Jet B Fuel type used Jet A The helicopter had been recently re-assembled upon return to Canada after operating overseas. The work began in February 2021 with test flights commencing 02 March 2021. Once subsequent maintenance and inspections were complete, the helicopter departed HTSC’s base at Ottawa/Carp Airport (CYRP), Ontario, on 01 June 2021, enroute to Dryden Regional Airport (CYHD), Ontario. Daily inspections were carried out while the helicopter was at CYHD. The occurrence pilot picked up the helicopter there and departed for the Nipigon fire base on 07 June 2021. Tail rotor drivetrain The tail rotor drivetrain consists of 6 driveshaft segments, 4 hanger assemblies, 3 coupling assemblies, 5 disc assemblies, and 2 gearboxes (42° and 90°) at the base and tip, respectively, of the vertical stabilizer (Figure 2). The coupling assemblies and disc assemblies provide axial and angular flexibility.
AIR TRANSPORTATION SAFETY INVESTIGATION REPORT A21C0052 ■ 5
Figure 2. Tail rotor drivetrain (Source: Bell, with TSB annotations)
Each of the 2 gearboxes is self-lubricated by an internal oil pump and is monitored by a chip detector, temperature switch, and low oil-pressure switch. A separation of the tail rotor drivetrain in front of the 42° gearbox will cause an immediate loss of oil pressure in both gearboxes. As a result, the 42° BOX OIL PRESS and 90° BOX OIL PRESS annunciators on the main warning and caution panel will illuminate. Figure 3 shows in detail the engine-deck-mounted tail rotor driveshaft hanger and the No. 2 coupling assembly.2 The forward flange of the splined coupling (item 15) is bolted to the aft end of the first driveshaft segment. The splined coupling houses, and meshes with, the crowned gear coupling (item 16), which has an output shaft that extends through the seal holder (item 12). The seal holder is retained in the splined coupling via a retainer ring (item 11).
2 For the purposes of this report, the 3 coupling assemblies are identified as No. 1, No. 2, and No. 3.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 6
Figure 3. Exploded view of the engine-deck-mounted tail rotor driveshaft hanger (Source: Bell, with TSB annotations)
Wreckage and impact information The helicopter landed on its left skid gear and came to rest leaning to the left on soft, boggy terrain. The skid gear cross tubes had been pushed 2 feet to the right from their normal position in the saddle mounts. The trailing edge of 1 tail rotor blade was damaged; however, there was no indication that the tail rotor was rotating at impact. The splined coupling (Figure 3, item 15) on the aft end of the first driveshaft segment was found disconnected from the crowned gear coupling (Figure 3, item 16) of the engine-deck-mounted tail rotor driveshaft hanger. The first driveshaft segment exhibited rotational scoring as a result of flailing and consequent contact with components in the fuselage compartment. A retainer ring (Figure 3, item 11), which should normally secure the seal holder (Figure 3, item 12) and crowned gear coupling within the splined coupling, was found lying loose in the fuselage compartment. The seal holder had exited the splined coupling and was loose on the shaft between the crowned gear coupling and the bearing hanger (Figure 3, item 10).
AIR TRANSPORTATION SAFETY INVESTIGATION REPORT A21C0052 ■ 7
The No. 1 coupling assembly had remained intact. However the inside face of its seal holder exhibited indentations caused by impact with the teeth of the crowned gear coupling due to the angular displacement of the first driveshaft segment as it flailed within the compartment. The remainder of the tail rotor drivetrain was contiguous from the crowned gear coupling of the No. 2 coupling assembly to the tail rotor. The pilot’s seat had remained secured to the cockpit floor. Both pilot seats were equipped with a shoulder harness, but the occurrence pilot felt that it restricted his ability to use the vertical reference bubble window. Therefore, the pilot did not utilize the shoulder harness during long line or slinging operations. Several items were retrieved from the wreckage for further examination, including 3 warning and caution annunciator panels and the No. 1 and No. 2 coupling assemblies. The TSB Laboratory analysis of individual lamp filaments from the 3 warning and caution annunciator panels was unable to determine with certainty which, if any, lights were illuminated prior to impact. The magnitude and orientation of the impact forces were not conducive to the creation of large-scale filament damage. Coupling assembly maintenance The No. 2 coupling assembly (part number 214-040-604-101, serial number A13-04871) was a component of the engine-deck-mounted tail rotor driveshaft hanger (part number 214-040-600-101, serial number A20-03086). Since its initial installation in November 2015, the No. 2 coupling assembly had undergone regular servicing in accordance with the Bell 214ST maintenance schedule. At the time of the occurrence, the No. 2 coupling assembly had accumulated 1250.1 hours since new and approximately 10 hours since the last servicing. During the reassembly of the aircraft in early 2021, the 3 coupling assemblies were serviced in accordance with the 500-hour/12-month inspection. They were removed, disassembled, cleaned, inspected, lubricated, and reinstalled on 27 and 28 April 2021. At that time, the occurrence aircraft had accumulated 20 206.1 airframe hours. All 3 coupling assemblies were serviced by the same aircraft maintenance engineer (AME). Another AME carried out a dual control check (DCC) during the completion of the work. HTSC had adopted the policy of having DCCs conducted after maintenance is performed on drivetrain components. The DCC must be conducted by personnel who have received the required training.3 The DCC is also known as a dual inspection or independent check and is to be performed on work that disturbs engine or flight controls.4 Rationale and guidance on conducting the inspection is
3 Helicopter Transport Services (Canada) Inc., Maintenance Policy Manual (18 July 2017), Appendix Mc 13: Independent Check (DCC). 4 Transport Canada, SOR/96-433, Canadian Aviation Regulations, Standard 571.10: Maintenance Release - Types of Work (d).
TRANSPORTATION SAFETY BOARD OF CANADA ■ 8
contained in a Transport Canada Airworthiness Notice.5 The fundamental component of the procedure is that a “second set of eyes” carries out a careful inspection of the completed work. Several daily inspections had been carried out before the occurrence flight. However, the Daily Inspection Check Sheet in use at that time by HTSC did not call for an inspection of tail rotor driveshaft coupling assemblies. Aircraft maintenance engineers The AME who serviced the 3 coupling assemblies began employment with HTSC in July 2015, as an apprentice AME after completing a Transport Canada-approved AME basic training course. After a 24- month apprenticeship with HTSC, he obtained an AME licence with M1/M2 ratings.6 After completing type training courses, he received HTSC aircraft certification authority (ACA) for Bell 206 and 407 helicopters. The AME who conducted the DCC began employment as an apprentice AME with HTSC in 2014 after completing a Transport Canada-approved AME basic training course. He served a 24-month apprenticeship with HTSC before obtaining an AME licence with an M2 rating. After completing type training courses, he received HTSC ACA for Bell 204, 205, 212, and 214ST helicopters. Retainer ring The retainer ring (Figure 3, item 11) is a spiral of approximately 690° made of flat spring steel that seats into a groove machined into the inner diameter of the splined coupling. The retainer ring secures the seal holder, and thus the crowned gear coupling, within the splined coupling. The dimensions of the retainer ring groove were examined using a coordinate measuring machine, a digital comparator, and optical scanning at a manufacturer’s facility. According to specifications, the retainer ring groove in the splined coupling should be between 0.068 inch and 0.073 inch wide. The retainer ring was 0.062 inch thick. This would result in a free space from 0.006 inch to 0.011 inch between the retainer ring and the edge of the groove. This suggests that a foreign object, or debris, thicker than 0.011 inch trapped between the spiral layers of the retainer ring could prevent the retainer ring from seating. However, an examination of the retainer ring could not determine whether a foreign object or debris had been trapped between the retainer ring layers. The occurrence retainer ring was deformed to the extent that the spiral would no longer lie flat. This was likely due to rotational forces and impact with the flailing splined coupling after becoming dislodged. The retainer ring did not appear to be worn, and its outside diameter compared favourably with the exemplar retainer ring.
5 Transport Canada, Airworthiness Notice No. C010: Inspection of Control Systems, Edition 2 (10 October 2001), at https://tc.canada.ca/en/aviation/reference-centre/airworthiness-notices/airworthiness-notices-c010-edition-2-10- october-2001 (last accessed 26 October 2021). 6 In the context of rotorcraft, an M1 rating applies to normal category rotorcraft that have a maximum take-off weight of 3175 kg or less and 9 passenger seats or less. An M2 rating applies to transport category rotorcraft and rotorcraft not included in the M1 rating.
AIR TRANSPORTATION SAFETY INVESTIGATION REPORT A21C0052 ■ 9
For an undetermined reason, the retainer ring was dislodged from the splined coupling. Subsequent movement of the main rotor transmission resulted in axial movement of the driveshaft. The seal holder, and ultimately the crowned gear coupling, exited the splined coupling, at which point the tail rotor drivetrain separated. This resulted in the loss of tail rotor thrust, and consequently, yaw control was lost. The investigation noted that, without the use of a visual inspection aid such as a mirror, or verification with a measuring device, inspection of the installed retainer ring (Figure 3, item 11) is hampered by the proximity of the bearing hanger (Figure 3, item 10). Loss of tail rotor thrust The Bell Model 214ST Rotorcraft Flight Manual describes the following effects in the case of a complete loss of tail rotor thrust: This is a situation involving a break in the drive system, such as a severed driveshaft, wherein the tail rotor stops turning and delivers no thrust. A failure of this type, in powered flight, will result in the nose of the helicopter swinging to the right (left side slip) and usually a roll of the fuselage. Nose down tucking will also be present. The severity of the ships [sic] initial reaction will be affected by airspeed, cabin-loading, center of gravity, power being used, and density altitude.7 In the event that the helicopter is in level flight, or a power dive, the following actions are to be taken: • chop the throttles and reduce pitch8 immediately; and • attain an airspeed slightly above normal autorotative glide speed. Note: If altitude permits with airspeed above 60 knots, throttle and pitch can be gently applied to see if some degree of powered flight can be resumed. If any adverse yawing is experienced, re-enter autorotation and continue the descent to a landing.9 The landing technique is prescribed as follows: During the final stages of the approach, a mild flare should be executed making sure that all power to the rotor is OFF. Maintain the helicopter in a slight flare and use collective smoothly to execute a soft, slightly nose-high landing. Landing on the aft portion of the skid will tend to correct side drift. This technique will, in most cases, result in a run-on type landing.10 On the occurrence flight, at approximately 1600 feet above ground level, the pilot completed these actions when he recognized the loss of tail rotor thrust and was able to slow the spin rate. However, he was committed to an autorotative descent onto the available terrain, which did not lend itself to a run-on type of landing.
7 Bell Helicopter, Bell Model 214ST Rotorcraft Flight Manual, Revision 15 (01 October 2010), Section 3: Tail Rotor Failures, Complete Loss of Tail Rotor Thrust, p. 3-21. 8 In the context of this section, “pitch” refers to the pitch angle, and thus angle of attack, of the main rotor blades and is controlled by the collective control lever. 9 Bell Helicopter, Bell Model 214ST Rotorcraft Flight Manual, Revision 15 (01 October 2010), Section 3: Tail Rotor Failures, Complete Loss of Tail Rotor Thrust, Corrective Action, 3. Level Flight or Power Dive, p. 3-22. 10 Ibid., 2. Climb, p. 3-22.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 10
TSB laboratory report The TSB completed the following laboratory report in support of this investigation: • LP085/2021 – Warning and caution annunciators analysis Safety action taken Immediately following the occurrence, HTSC grounded the 3 remaining Bell 214STs in its fleet pending inspection of each helicopter’s complete tail rotor drivetrain to verify correct installation. A memo was distributed to all pilots reminding them about ensuring sufficient airspeed to maintain helicopter control during an emergency involving the tail rotor or a total loss of tail rotor thrust in cruise flight. The Emergency Equipment and Procedures Ground Training curriculum now includes training in loss of tail rotor effectiveness and total loss of tail rotor thrust. The HTSC Bell 214ST daily inspection was amended to require the opening of an additional access panel to facilitate the inspection of the engine-deck-mounted tail rotor driveshaft hanger and the No. 2 coupling assembly. A 5-page handout was added to the HTSC Bell 214ST aircraft certification authority type training course. The handout emphasized inspection areas and reiterated the requirement for a thorough DCC during the 500-hour/12-month servicing of the 3 coupling assemblies. Safety messages As seen in this occurrence, the consequences of an incompletely seated retainer ring entering service can lead to a failure of the tail rotor drivetrain and consequent loss of tail rotor thrust. Therefore, since some components, such as a seated retainer ring, may be difficult to view, the use of visual inspection aids and measuring tools may be warranted during installation and subsequent DCC inspection. This report concludes the Transportation Safety Board of Canada’s investigation into this occurrence. The Board authorized the release of this report on 02 February 2022. It was officially released on 08 February 2022. Visit the Transportation Safety Board of Canada’s website (www.tsb.gc.ca) for information about the TSB and its products and services. You will also find the Watchlist, which identifies the key safety issues that need to be addressed to make Canada’s transportation system even safer. In each case, the TSB has found that actions taken to date are inadequate, and that industry and regulators need to take additional concrete measures to eliminate the risks.
AIR TRANSPORTATION SAFETY INVESTIGATION REPORT A21C0052 ■ 11
ABOUT THIS INVESTIGATION REPORT This report is the result of an investigation into a class 4 occurrence. For more information, see the Policy on Occurrence Classification at www.tsb.gc.ca The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. TERMS OF USE Use in legal, disciplinary or other proceedings The Canadian Transportation Accident Investigation and Safety Board Act states the following: • 7(3) No finding of the Board shall be construed as assigning fault or determining civil or criminal liability. • 7(4) The findings of the Board are not binding on the parties to any legal, disciplinary or other proceedings. Therefore, the TSB’s investigations and the resulting reports are not created for use in the context of legal, disciplinary or other proceedings. Notify the TSB in writing if this investigation report is being used or might be used in such proceedings. Non-commercial reproduction Unless otherwise specified, you may reproduce this investigation report in whole or in part for non-commercial purposes, and in any format, without charge or further permission, provided you do the following: • Exercise due diligence in ensuring the accuracy of the materials reproduced. • Indicate the complete title of the materials reproduced and name the Transportation Safety Board of Canada as the author. • Indicate that the reproduction is a copy of the version available at [URL where original document is available]. Commercial reproduction Unless otherwise specified, you may not reproduce this investigation report, in whole or in part, for the purposes of commercial redistribution without prior written permission from the TSB. Materials under the copyright of another party Some of the content in this investigation report (notably images on which a source other than the TSB is named) is subject to the copyright of another party and is protected under the Copyright Act and international agreements. For information concerning copyright ownership and restrictions, please contact the TSB. Citation Transportation Safety Board of Canada, Air Transportation Safety Investigation Report A21C0052 (released 08 February 2022). Transportation Safety Board of Canada 200 Promenade du Portage, 4th floor Gatineau QC K1A 1K8 819-994-3741; 1-800-387-3557 www.tsb.gc.ca communications@tsb.gc.ca © Her Majesty the Queen in Right of Canada, as represented by the Transportation Safety Board of Canada, 2022 Air transportation safety investigation report A21C0052 Cat. No. TU3-10/21-0052E-PDF ISBN: 978-0-660-41856-8 This report is available on the website of the Transportation Safety Board of Canada at www.tsb.gc.ca Le présent rapport est également disponible en français.
FD06115 | 2021_加拿大_TSBC_R21C0070_Grass_Fire_Right-of-Way_CN_Calgary_2021.pdf
分类:06_境外及港澳台调查报告 | 年份:2021 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R21C0070 FIRE ON RIGHT-OF-WAY Canadian National Railway Company Yard assignment YCYS61-16 Mile 124.95, Three Hills Subdivision Calgary, Alberta 17 July 2021 The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. This report is not created for use in the context of legal, disciplinary or other proceedings. See the Terms of use at the end of the report. The occurrence On 17 July 2021, Canadian National Railway Company (CN) remote control locomotive system (RCLS)1 yard assignment YCYS61-16, consisting of 2 locomotives and 37 loaded rail cars, was proceeding north on the CN Three Hills Subdivision, from CN Sarcee Yard (Mile 126) in Calgary2 toward the CN Calgary Logistics Park (Mile 114.6). At approximately 0149,3 the assignment was travelling at 10 mph near Mile 124.95 when the crew noticed that the lead locomotive (CN 7524) was emitting flames and embers from the exhaust stacks (Figure 1). Some embers migrated to the right-of-way, igniting grass fires. The rail traffic controller was notified, and the Calgary fire department was dispatched.
1 A remote control locomotive system (RCLS) enables crews to control the locomotives remotely from a position on the ground or while riding on a locomotive or a rail car; crew members therefore do not need to be in the locomotive cab throughout their shift. 2 All locations are in the province of Alberta. 3 All times are Mountain Daylight Time.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 2
The fires were extinguished by 0900. There were no dangerous goods involved, and the track did not sustain structural damage. No one was injured. Figure 1. Flames emitting from locomotive CN 7524 (Source: Global News) It was later determined that the grass fires extended along the right-of-way for approximately 2376 feet, from 36 Street SE to Erin Mount Crescent pedestrian crossing (Figure 2). They were contained between the track and a wire fence on the east side of the track. Figure 2. Map of the occurrence location showing the intended route of the train, with an inset map showing the location of the grass fires on the right-of-way and a smaller inset map showing the location of the city of Calgary in Alberta (Source: Google Earth, with TSB annotations)
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R21C0070 ■ 3 Weather information At the time of the occurrence, the temperature was 15 °C, with a northwest wind ranging from 9 to 19 km/h. The relative humidity was around 70%. In the week before the occurrence, the daytime high temperature had ranged from 25 °C to 30 °C. Crew information As is common for crews operating RCLS assignments, the crew consisted of 2 conductors, who were both in the cab of the locomotive. The crew members were qualified for their respective positions and met established fitness and rest requirements. Subdivision information The Three Hills Subdivision runs north to south between Mirror (Mile 0.0) and the CN Sarcee Yard (Mile 126). It services traffic between Calgary and Edmonton. Train traffic is governed by the occupancy control system between Mile 3 and Mile 124, as authorized by the Transport Canada (TC)–approved Canadian Rail Operating Rules. All movements are dispatched by a rail traffic controller located in Edmonton. Sarcee Yard The CN Sarcee Yard is in an industrial area of southeast Calgary. It is a small satellite yard used mainly to switch cars and make up trains. Yard assignments service the industrial areas around the yard and throughout Calgary, including the CN Calgary Logistics Park. There are commercial and industrial properties adjacent to the yard, with residential property to the north. The yard has few mechanical personnel on site and minimal maintenance facilities. The locomotives operating in yard assignments at Sarcee Yard remain in Calgary and are inspected and maintained by a mobile repair team until major repairs are required, at which point they are moved to a CN repair facility in a larger yard, usually in Edmonton. In Sarcee Yard, locomotives are often kept idling as their crews may not be able to troubleshoot issues if they have difficulty restarting a locomotive. Locomotive CN 7524 Locomotive CN 7524 was a GP38-2 2000 hp locomotive manufactured by General Motors’ Electro- Motive Division in 1972. This type of locomotive is powered by a 16-cylinder, 4-stroke diesel engine equipped with a supercharger. Supercharged diesel engines The operation of a diesel engine requires a continuous delivery of air, fuel, coolant, and lubricating oil. The 4 strokes, which relate to the movement of the piston in each cylinder, are as follows: intake, compression, combustion, and exhaust. During the compression stroke, atomized fuel is injected at a precise time to result in combustion, forcing the piston down and the crankshaft to rotate. The amount of fuel injected depends on the throttle position and load demand. In a supercharged engine, a compressor, driven mechanically from the engine’s crankshaft, increases air pressure in the cylinders to produce more power during
TRANSPORTATION SAFETY BOARD OF CANADA ■ 4
combustion. Locomotives equipped with supercharged engines have spark arrestors to prevent the emission of flammable debris from the engine. The spark arrestor is located between the exhaust manifold and the exhaust stack. It diverts any debris in the exhaust downward and captures this debris in a trap. The trap can be accessed by maintenance personnel and cleaned without removing the spark arrestor. The diesel engine on locomotive CN 7524 is equipped with 16 power assemblies, 8 on each side. The power assemblies include mechanical components that open and close the intake and exhaust valves; these valves regulate the addition of fuel and air delivered to the cylinders and expel exhaust gases during each combustion cycle. Components inside each power assembly include cylinder liners, pistons, fuel injector nozzles, pushrods, rocker arms, valves, and springs. Failure of key parts within the power assembly can disrupt the combustion cycle, resulting in incomplete compression and combustion of fuel. Carbon deposit buildup in the exhaust system Under certain circumstances, for instance when locomotives are left idling for extended periods or when there is incomplete combustion of fuel, carbon deposit can build up in the exhaust system. When this buildup is excessive, it can ignite under high power settings, creating a risk of fire. Regulatory requirements regarding carbon deposit buildup With respect to carbon deposit buildup, the TC–approved Railway Locomotive Inspection and Safety Rules state the following: Locomotives operated in service during the fire season, shall have exhaust passages on the discharge side of spark arresting devices or turbo-chargers kept free of oil accumulation and carbonaceous deposits in excess of ⅛ inch (3 mm) in thickness.4 Fire season is defined as the period of time from 01 April to 31 October.5 Canadian National instructions on handling locomotives that have been idling for an extended period To reduce the risks associated with carbon buildup in a locomotive exhaust system, CN’s Locomotive Engineer Operating Manual – Form 8960 provides instructions on handling locomotives that have been idling for an extended period. It states, in part: When handling non–turbocharged locomotives or consists that have been idling in excess of 3 hours or [for an] unknown period of time, the locomotive or consist must be revved in throttle 6 or 7 for 15 minutes or until exhaust clears before proceeding with work.6
4 Transport Canada, Railway Locomotive Inspection and Safety Rules (03 July 2015), Part III, item 26: Internal Combustion Engines. 5 Ibid., Part I, item 3: Definitions. 6 Canadian National Railway Company, Locomotive Engineer Operating Manual – Form 8960 (01 May 2016), Revisions, additions, deletions. Section B1.2, new item h.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R21C0070 ■ 5 Locomotive auto-start function Locomotives are often equipped with a smart-start function that automatically shuts off and restarts the engine of an idling locomotive when certain conditions are met, for instance if the engine oil temperature or the ambient temperature reaches a given value. The smart-start function keeps locomotives from idling for extended periods, which both conserves fuel and prevents pollution. Locomotive CN 7524 was equipped with a smart-start function; however, the function was disabled because the locomotive had weak batteries and restarting the engine may have been difficult if it were shut down. Recorded information The lead locomotive was equipped with a locomotive event recorder (LER). A review of the data revealed no train handling anomalies. The LER data showed that, when the occurrence crew began their shift at 2141 on 16 July 2021, the locomotive had been idling in Sarcee Yard since 2145 the previous day. In the movements preceding the occurrence, the throttle modulations were frequent, and the throttle positions were held only for short periods, contrary to CN instructions on handling locomotives that have been idling for an extended period. During the occurrence movement, the throttle was placed in position 8 for about 3 minutes, at which time the flames were noticed. This was the first time that a high throttle position was held for more than a few seconds. Inspection and maintenance of locomotive CN 7524 The last major maintenance of locomotive CN 7524 before the occurrence was conducted from 12 June to 17 June 2021, at CN’s shop in Edmonton. As part of this maintenance, the locomotive underwent electrical and mechanical inspections. Actionable defects identified during these inspections were repaired before the locomotive returned to service at Sarcee Yard; however, the weak batteries were not replaced. Locomotive safety inspections7 were performed on 3 occasions in Calgary after the locomotive returned to service: on 29 June, 02 July, and 06 July. At the time of the occurrence, CN was inspecting the exhaust system at least every 30 days on locomotives equipped with supercharged engines. The spark arrestor on the locomotive was visually inspected in Calgary on 08 July and 12 July 2021, with no anomalies noted. Post-occurrence inspection of locomotive CN 7524 After the occurrence, locomotive CN 7524 was transferred from Calgary to CN’s locomotive shop in Edmonton for inspection.
7 According to the Railway Locomotive Inspection and Safety Rules, Part I, item 3: Definitions, a safety inspection means “an examination of a locomotive for safety defects while stationary by a certified locomotive inspector or a person in charge as defined herein [to] verify that it may move safely, and to identify those defects listed in Part III of these rules which may inhibit such movement and require correction. Safety inspections are intended to be of a visual nature.”
TRANSPORTATION SAFETY BOARD OF CANADA ■ 6
A teardown of the locomotive’s exhaust system was performed on 23 and 24 July 2021, with a TSB investigator present. The thickness of the carbon deposits in the exhaust stack was measured and determined to be less than ⅛ inch thick. Compression testing was also performed by CN on all power assemblies, and the result indicated that the No. 11 power assembly had no compression and the No. 3 power assembly had low compression. As diesel engines rely on compression to create heat and to ignite the diesel fuel, the diesel fuel injected into the No. 11 power assembly and possibly the No. 3 power assembly was not igniting. As a result, during the exhaust cycle, unburned diesel fuel was being expelled into the exhaust system. Once in the exhaust system, the diesel fuel ignited, causing a fire in the locomotive exhaust stack. Unburned fuel can result in a buildup of carbon deposits in the exhaust system. It is likely that some of the carbon deposits present at the time of the occurrence ignited, creating embers that were expelled from the locomotive exhaust stack before the flames were noticed by the crew. Embers migrated to the right-of-way, igniting grass fires. The 2 power assemblies were replaced. No further examination was performed on the failed power assemblies to determine the cause of the failure. Safety action taken In response to this occurrence and other recent occurrences involving fires on a railway right-of-way, TC approved the new Railway Extreme Heat and Fire Risk Mitigation Rules, which came into effect on 15 June 2022. The new rules stipulate requirements to address track integrity during periods of extreme heat, for inspection of the exhaust system, and for a fire risk mitigation plan for the prevention of fires on railway rights-of-way. Safety message At the beginning of the shift, the locomotive engine had been idling for 24 hours. Before proceeding with work, the locomotive was not revved in throttle position 6 or 7 for sufficient time to clear any accumulated carbon deposits from the exhaust system, contrary to CN instructions. Revving the engine can provide train crews with the opportunity to clear the exhaust stack in a controlled setting and detect excessive embers that could indicate abnormal engine function. Therefore, it is important for crews to follow instructions for clearing carbon deposits in the exhaust system on locomotives that have been idling for an extended period. This report concludes the Transportation Safety Board of Canada’s investigation into this occurrence. The Board authorized the release of this report on 23 November 2022. It was officially released on 15 December 2022. Visit the Transportation Safety Board of Canada’s website (www.tsb.gc.ca) for information about the TSB and its products and services. You will also find the Watchlist, which identifies the key safety issues that need to be addressed to make Canada’s transportation system even safer. In each case, the TSB has found that actions taken to date are inadequate, and that industry and regulators need to take additional concrete measures to eliminate the risks.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R21C0070 ■ 7 ABOUT THIS INVESTIGATION REPORT This report is the result of an investigation into a class 4 occurrence. For more information, see the Policy on Occurrence Classification at www.tsb.gc.ca The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. TERMS OF USE Use in legal, disciplinary or other proceedings The Canadian Transportation Accident Investigation and Safety Board Act states the following: • 7(3) No finding of the Board shall be construed as assigning fault or determining civil or criminal liability. • 7(4) The findings of the Board are not binding on the parties to any legal, disciplinary or other proceedings. Therefore, the TSB’s investigations and the resulting reports are not created for use in the context of legal, disciplinary or other proceedings. Notify the TSB in writing if this investigation report is being used or might be used in such proceedings. Non-commercial reproduction Unless otherwise specified, you may reproduce this investigation report in whole or in part for non-commercial purposes, and in any format, without charge or further permission, provided you do the following: • Exercise due diligence in ensuring the accuracy of the materials reproduced. • Indicate the complete title of the materials reproduced and name the Transportation Safety Board of Canada as the author. • Indicate that the reproduction is a copy of the version available at [URL where original document is available]. Commercial reproduction Unless otherwise specified, you may not reproduce this investigation report, in whole or in part, for the purposes of commercial redistribution without prior written permission from the TSB. Materials under the copyright of another party Some of the content in this investigation report (notably images on which a source other than the TSB is named) is subject to the copyright of another party and is protected under the Copyright Act and international agreements. For information concerning copyright ownership and restrictions, please contact the TSB. Citation Transportation Safety Board of Canada, Rail Transportation Safety Investigation Report R21C0070 (released 15 December 2022). Transportation Safety Board of Canada 200 Promenade du Portage, 4th floor Gatineau QC K1A 1K8 819-994-3741; 1-800-387-3557 www.tsb.gc.ca communications@tsb.gc.ca © His Majesty the King in Right of Canada, as represented by the Transportation Safety Board of Canada, 2022 Rail transportation safety investigation report R21C0070 Cat. No. TU3-11/21-0070E-PDF ISBN: 978-0-660-46640-8 This report is available on the website of the Transportation Safety Board of Canada at www.tsb.gc.ca Le présent rapport est également disponible en français.
FD06116 | 2021_加拿大_TSBC_R21V0144_Locomotive_Engine_Fire_CP_Railway_Elko_BC_2021.pdf
分类:06_境外及港澳台调查报告 | 年份:2021 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R21V0144 LOCOMOTIVE ENGINE FIRE Canadian Pacific Railway Company Freight train 880-066 Mile 54.3, Cranbrook Subdivision Elko, British Columbia 08 July 2021
TRANSPORTATION SAFETY BOARD OF CANADA ■ 2 ABOUT THIS INVESTIGATION REPORT This report is the result of an investigation into a class 3 occurrence. For more information, see the Policy on Occurrence Classification at www.tsb.gc.ca The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. TERMS OF USE Use in legal, disciplinary or other proceedings The Canadian Transportation Accident Investigation and Safety Board Act states the following: • 7(3) No finding of the Board shall be construed as assigning fault or determining civil or criminal liability. • 7(4) The findings of the Board are not binding on the parties to any legal, disciplinary or other proceedings. Therefore, the TSB’s investigations and the resulting reports are not created for use in the context of legal, disciplinary or other proceedings. Notify the TSB in writing if this investigation report is being used or might be used in such proceedings. Non-commercial reproduction Unless otherwise specified, you may reproduce this investigation report in whole or in part for non-commercial purposes, and in any format, without charge or further permission, provided you do the following: • Exercise due diligence in ensuring the accuracy of the materials reproduced. • Indicate the complete title of the materials reproduced and name the Transportation Safety Board of Canada as the author. • Indicate that the reproduction is a copy of the version available at [URL where original document is available]. Commercial reproduction Unless otherwise specified, you may not reproduce this investigation report, in whole or in part, for the purposes of commercial redistribution without prior written permission from the TSB. Materials under the copyright of another party Some of the content in this investigation report (notably images on which a source other than the TSB is named) is subject to the copyright of another party and is protected under the Copyright Act and international agreements. For information concerning copyright ownership and restrictions, please contact the TSB. Citation Transportation Safety Board of Canada, Rail Transportation Safety Investigation Report R21V0144 (released 24 August 2023). Transportation Safety Board of Canada 200 Promenade du Portage, 4th floor Gatineau QC K1A 1K8 819-994-3741; 1-800-387-3557 www.tsb.gc.ca communications@tsb.gc.ca © His Majesty the King in Right of Canada, as represented by the Transportation Safety Board of Canada, 2023 Rail transportation safety investigation report R21V0144 Cat. No. TU3-11/21-0144E-PDF ISBN: 978-0-660-49861-4 This report is available on the website of the Transportation Safety Board of Canada at www.tsb.gc.ca Le présent rapport est également disponible en français.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R21V0144 ■ 3 Table of contents 1.0 Factual information ................................................................................................. 4 1.1 The occurrence ............................................................................................................................................ 4 1.1.1 Trackside fire ................................................................................................................................ 7 1.2 Crew information ........................................................................................................................................ 8 1.3 Weather information ................................................................................................................................. 8 1.4 Recorded information............................................................................................................................... 9 1.5 Subdivision and track information ...................................................................................................... 9 1.6 Turbocharged diesel engines ................................................................................................................ 9 1.7 Locomotive CP 9779 ...............................................................................................................................11 1.7.1 Post-occurrence inspection .................................................................................................11 1.7.2 Maintenance history ...............................................................................................................13 1.7.3 Regulatory inspections ..........................................................................................................14 1.8 System health monitoring.....................................................................................................................15 1.8.1 Health monitoring on distributed power systems ......................................................15 1.8.2 Third-party remote health monitoring systems ...........................................................16 1.8.3 Wayside inspection systems ................................................................................................16 1.9 Regulatory requirements for train inspections .............................................................................16 1.10 Canadian Pacific instructions related to train operations during fire season...................17 1.11 Railway Extreme Heat and Fire Risk Mitigation Rules .................................................................18 1.12 Third-party reporting of locomotive fires .......................................................................................20 1.13 Reporting of fires to the TSB ...............................................................................................................20 2.0 Analysis ................................................................................................................... 22 2.1 The occurrence ..........................................................................................................................................22 2.2 Engine failure and fire on CP 9779 ....................................................................................................22 2.2.1 History of power assembly replacements on CP 9779 ..............................................23 2.3 Trackside fire near the Caithness Road public crossing ............................................................23 2.4 Locomotive health monitoring ...........................................................................................................24 2.5 Railway and regulatory requirements based on fire danger ...................................................25 3.0 Findings ................................................................................................................... 26 3.1 Findings as to causes and contributing factors ............................................................................26 3.2 Findings as to risk .....................................................................................................................................26 3.3 Other findings ............................................................................................................................................26 4.0 Safety action ........................................................................................................... 27 4.1 Safety action taken ..................................................................................................................................27 4.1.1 Canadian Pacific ........................................................................................................................27 4.2 Safety concern ...........................................................................................................................................27 4.2.1 Monitoring for fires on locomotives operating in a remote position in a train consist ...........................................................................................................................................27
TRANSPORTATION SAFETY BOARD OF CANADA ■ 4
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R21V0144 LOCOMOTIVE ENGINE FIRE Canadian Pacific Railway Company Freight train 880-066 Mile 54.3, Cranbrook Subdivision Elko, British Columbia 08 July 2021 The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. This report is not created for use in the context of legal, disciplinary or other proceedings. See the Terms of use on page 2. Summary On 08 July 2021, Canadian Pacific Railway Company (CP) train 880-066 was travelling eastward on the Cranbrook Subdivision near Caithness, British Columbia, when its mid- train distributed power locomotive sustained a mechanical failure that resulted in flames emanating from the exhaust stack. Due to the remote position of the locomotive in the train consist, the situation went undetected until the condition was observed by the crew of an opposing CP train (V09-012) during a meet at the siding in Elko, British Columbia, about 5 miles east of Caithness. It is likely that hot embers were emitted from the exhaust stack on the damaged locomotive, ignited vegetation, and caused a trackside fire near Caithness. The fire was reported by a member of the public, grew to 1.2 hectares, and was extinguished by the local volunteer fire department, with the help of BC Wildfire Service. The track in the area was not damaged. There were no dangerous goods involved in this occurrence, and no one was injured. 1.0 FACTUAL INFORMATION 1.1 The occurrence On 08 July 2021, eastbound Canadian Pacific Railway Company (Canadian Pacific or CP)1 train 880-066 (the eastbound train) was travelling on the Cranbrook Subdivision, en route
1 On 14 April 2023, Canadian Pacific Railway Company (CP) and Kansas City Southern (KCS) combined into a single railway company doing business as CPKC. As the occurrence took place before the transition date, the acronym CP will be used throughout the report.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R21V0144 ■ 5 to Sparwood (Mile 17.7),2 from where it would travel to one of the several mines in the area to be loaded with coal for transport to Vancouver. The eastbound train was powered by 3 distributed power (DP) locomotives:3 1 at the head end, 1 in a mid-train position, and 1 at the tail end. The mid-train and tail-end locomotives were remotely controlled by radio command from the lead locomotive. The train was handling 152 empty coal hopper cars. It weighed 3269 tons and measured 8289 feet. At approximately 1500,4 as the eastbound train was about a mile away from Elko, the rail traffic controller (RTC) radioed and asked the crew members if they had observed a fire in the vicinity of Caithness Road (Mile 59.2) (Figure 1). They responded that they had not. Figure 1. Map showing the occurrence location, with inset maps showing the location where the exhaust stack fire likely started, and where it was detected by the westbound train crew; a third inset map, in the bottom left corner, shows the location of Elko in British Columbia (Source: Google Earth, with TSB annotations) Shortly after, the eastbound train approached the east siding switch at Elko (Mile 53.56), where it would be meeting westbound CP train V09-012 (the westbound train). The eastbound locomotive engineer (LE) asked the westbound crew to look at his (eastbound)
2 All locations are in the province of British Columbia, unless otherwise indicated. 3 Distributed power (DP) systems provide synchronous or independent control of locomotives at up to 4 locations throughout a train. Train handling commands from the crew on the lead locomotive are transmitted by DP radio to each of the remote locomotives. When the remote locomotives receive the radio message, they respond by executing the train handling commands. 4 All times are Mountain Daylight Time.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 6 train as the 2 trains passed each other, to check for a possible fire. The westbound crew agreed to perform the check. The eastbound train came to a stop on the main track at the east switch at Elko. While the westbound train was operating through the siding, its crew performed the requested inspection and noticed that flames were coming out of the exhaust stack on the mid-train locomotive. The crew of the westbound train contacted the crew of the eastbound train to inform them of the situation. Figure 2 shows a photograph of the exhaust stack fire, taken by a resident at Elko while the train was coming to a stop on the main track. At this time, the locomotive throttle had been returned to idle, reducing the engine’s RPM and the engine exhaust flow. It is likely that the flames coming from the exhaust stack were much higher when the train was in motion, as the locomotive throttle would have been in a higher position than idle. After being told of the exhaust stack fire, the LE on the eastbound train asked the westbound crew to stop and activate the emergency fuel cut-off on the mid-train remote locomotive (CP 9779). However, the head end of the westbound train had already gone past this locomotive and the westbound crew, concerned that the fire might propagate to their own train, which was loaded with coal, elected to continue without stopping. The LE of the eastbound train was able to shut down the diesel engine on the mid- train locomotive from his position on the lead locomotive using the on-board remote locomotive controls. He then contacted the RTC to provide an update, and indicated that the conductor would perform a walking inspection. The RTC, in turn, contacted the area supervisor, who was in Fort Steele at the time (43 miles away). The supervisor drove to the eastbound train’s location to assess the situation. The conductor inspected the mid-train locomotive, but there were no visible signs of fire. As a precautionary measure, he activated the emergency fuel cut-off on each side of the locomotive. When the area supervisor arrived, he assessed that it was safe to bring the train to Sparwood. The train resumed its trip about 3.25 hours after having stopped at Elko. At Sparwood, the mid-train locomotive was removed from the train and secured on the back track for follow-up mechanical inspection. The train then continued on to one of the coal mines in the area for loading, as planned. Figure 2. Exhaust stack fire on the mid-train remote locomotive (Source: Elko resident)
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R21V0144 ■ 7 There were no dangerous goods involved in this occurrence, and no one was injured. 1.1.1 Trackside fire At about 1445, a member of the public heard a loud noise as the train was travelling past the Caithness Road public crossing (Mile 59.5). The person who heard the loud noise lived close to the railway right-of-way (ROW),5 was familiar with the sounds associated with the passing of trains, and considered that this sound was unusual. At about 1448, shortly after the eastbound train had passed over the crossing, another member of the public contacted local emergency services through 911 to report a trackside6 fire on the north side of the ROW, west of the crossing. The emergency services dispatched the local volunteer firefighters from the nearby community of Jaffray, then notified CP’s Operations Centre. The local firefighters arrived at the scene about 12 minutes after receiving the call; at this time, the fire was about 0.5 hectare in size. BC Wildfire Service was also dispatched and brought in airborne support. The fire grew to approximately 1.2 hectares in size and extended beyond the CP ROW, to the private property of a local farmer. The fire was extinguished about 3.5 hours later. The fence along the ROW was damaged, as well as some surplus ties; the damage to the local farmer’s property was limited to vegetation (Figure 3).
5 Railway-operated right-of-way (ROW) extends approximately 50 feet (15.25 m) from the centre of the outermost track on both sides. 6 Trackside refers to the property immediately adjacent to the railway ROW.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 8 Figure 3. Damage from the trackside fire near Caithness (Source: TSB)
Follow-up inspection of the track and roadbed west of the Caithness Road public crossing revealed an accumulation of lubricating oil on the ballast on the south side of the track. The oil was first observed adjacent to the location of the trackside fire, about 1000 feet west of the crossing, and extended eastward through the crossing. 1.2 Crew information The crew of the eastbound train was composed of an LE and a conductor. Both crew members met established rest and fitness requirements and were qualified for their respective positions. 1.3 Weather information At the time of the occurrence, the temperature was 30 °C and the sky was clear. According to the Province of British Columbia fire danger ratings, the fire danger in the Elko area was high on the day of the occurrence; the following day, it was extreme.7
7 The Province of British Columbia uses the Canadian Forest Fire Danger Rating System to rate the fire danger, i.e., the risk of a wildfire starting. There are 5 possible ratings, from very low to extreme. Different ratings are assigned to different geographic areas based on weather station data. Ratings are updated daily.
A high danger rating is defined as follows: “Forest fuels are very dry and the fire risk is serious. New fires may start easily, burn vigorously, and challenge fire suppression efforts. Extreme caution must be used in any forest activities. Open burning and industrial activities may be restricted.”
An extreme danger rating is defined as follows: “Extremely dry forest fuels and the fire risk is very serious. New fires will start easily, spread rapidly, and challenge fire suppression efforts. General forest activities may
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R21V0144 ■ 9 There were no restrictions applicable to railway operations on the basis of the provincial fire danger ratings in effect. 1.4 Recorded information The tail-end remote locomotive was equipped with a forward-facing camera; however, it was not operative at the time of the occurrence. The mid-train remote locomotive was equipped with an on-train monitoring recorder, which kept a log of all the errors generated by the computer on the locomotive, known as a fault log. Based on a review of the fault log, no mechanical failure of the locomotive was recorded by the system. The investigation determined that the mid-train remote locomotive was in a high throttle position (6 to 8) when it travelled in the area of the Caithness Road public crossing. 1.5 Subdivision and track information The Cranbrook Subdivision runs east to west between Crowsnest8 (Mile 0.0) and Glenlily (Mile 156.8). Train movements are governed by the occupancy control system, as authorized by the Canadian Rail Operating Rules (CROR) and dispatched by an RTC located in Calgary, Alberta. This is a Class 3 track under the Rules Respecting Track Safety, with a maximum permissible freight train speed on the subdivision of 40 mph. In the area of the Caithness Road public crossing, the track has a 1% grade. For eastbound trains, the grade is ascending. 1.6 Turbocharged diesel engines Locomotive CP 9779 is a General Electric AC4400CW locomotive manufactured in 2003. It is powered by a GE 7FDL 16-cylinder, 4-stroke turbocharged diesel engine capable of delivering up to 4400 horsepower. The diesel engine drives a main alternator that generates 3-phase alternating current (AC) electrical power. The electrical power is passed through rectifiers and inverters before being supplied to the 6 AC traction motors that drive each axle on the locomotive. The operation of a diesel engine requires a continuous delivery of the correct ratio of air and fuel, as well as circulation of coolant and lubricating oil. The 4 strokes, which relate to the movement of the piston in each cylinder, are as follows: intake, compression, combustion and exhaust.
be restricted, including open burning, industrial activities and campfires.” [Source: Government of British Columbia, “Fire Danger,” at https://www2.gov.bc.ca/gov/content/safety/wildfire-status/wildfire-situation/fire- danger (last accessed on 02 August 2023)]. 8 The east switch at Crowsnest is in Alberta. However, the yard tracks and the west switch are in British Columbia. The west switch is at Mile 0.0 of the Cranbrook Subdivision.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 10 During the compression stroke, high-pressure fuel is injected and atomized at a precise interval to result in combustion, forcing the piston down and the crankshaft to rotate. The amount and timing of fuel delivery is electronically controlled by the engine governor unit as determined by various factors such as throttle position, associated load being demanded, and required engine speed. Low pressure fuel (90 psi) is pressurized to 18 000 psi by high- pressure fuel pumps. The engine governor unit controls a solenoid on the high-pressure fuel pump that delivers a precise amount of high-pressure fuel to the fuel injection nozzles. The camshaft is used to control the opening and closing of intake and exhaust valves located at the top of the cylinder’s combustion chamber; it has irregular-shaped lobes that are in constant contact with pushrods. When the camshaft rotates, the lobes move the pushrods up and down. The pushrods push on rocker arms which, in turn, pivot and push down on spring-loaded valves. When open, intake valves let compressed air into the cylinders, and exhaust valves allow exhaust to be expelled. The timing of the opening and closing of the valves is thereby controlled by the rotation of the camshaft. Turbochargers use hot exhaust gases, expelled from the cylinder following combustion of the fuel/air mixture during each cycle, to drive a turbine that is connected by a shaft to a compressor. The compressor fan compresses the air being delivered to the cylinders. This increases the amount of oxygen being supplied, which makes the combustion process more efficient. The lubricating system consists of a sump pan under the crankshaft and a lubricating oil pump. The oil is pumped through various passages in the engine block and other components to supply lubrication to friction surfaces throughout the engine. The oil lubricates, cools, and seals piston rings and cylinder walls, and it suspends microscopic particles from the combustion process to prevent them from causing wear. Friction from the moving parts, as well as the combustion process, causes heat to build up in the engine. This heat is reduced by a liquid coolant that flows around the sides of the cylinder walls and liners. Engine heat captured by the coolant is then dissipated to the atmosphere through the radiators. The majority of North American freight locomotives use water as the coolant rather than an anti-freeze solution. The diesel engine on locomotive CP 9779 is equipped with 16 power assemblies, with 8 power assemblies on each side in a “V” formation. The power assemblies include mechanical components that open and close the intake valves, regulating the addition of fuel and air delivered to each cylinder, and the exhaust valves, to expel exhaust gases from each cylinder during each combustion cycle. Components inside each power assembly include the cylinder, cylinder head, jacket, liner, piston, connecting rod, fuel injector nozzle, pushrods, rocker arms, valves, and springs. The electronic high-pressure fuel pump and the high-pressure fuel line connecting to the fuel injection nozzle are visible on top of the power assembly cylinder head. Failure of key parts of the power assembly, such as a dropped valve or broken piston, require the replacement
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R21V0144 ■ 11 of the power assembly. Replacement of worn or failed parts in an individual power assembly can be made without a complete teardown of the diesel engine. 1.7 Locomotive CP 9779 1.7.1 Post-occurrence inspection Following the occurrence, locomotive CP 9779, which was held in Sparwood, underwent a mechanical inspection by a TSB investigator and CP mechanical staff to determine the cause of the fire. The inspection determined that the R8 power assembly (the 8th power assembly on the right side) failed. A rocker arm on this power assembly was found broken, and both the power assembly housing and the air intake manifold were damaged. An exhaust valve was found broken with its head badly damaged and the valve stems were bent on the remaining exhaust valve and both intake valves. The fuel injector tip was found broken off. In addition, valve seat recession9 was noted on the failed valve. Figure 4. Air intake manifold and R8 power assembly on locomotive CP 9779 (Source: TSB)
Figure 4 shows the relative position of the R8 power assembly and air intake manifold, Figure 5 shows various parts of the R8 power assembly, including the broken rocker arm, and Figure 6 shows the damage on the air intake manifold.
9 Valve seat recession occurs when a valve in an internal combustion engine gets embedded into the cylinder head.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 12 Figure 5. Broken rocker arm in the R8 power assembly on locomotive CP 9779 (Source: TSB)
Figure 6. Bottom view of the air intake manifold on locomotive CP 9779, showing the damage and its location (Source: TSB)
The head of the exhaust valve broke off and dropped into the combustion chamber while the engine was in operation, breaking the tip off the fuel injector.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R21V0144 ■ 13 Lubricating oil from the damaged power assembly could no longer be contained within the power assembly and it accumulated within the engine compartment. The oil subsequently migrated down the side of the locomotive and onto the ballast. The resulting loss of combustion air pressure due to the damaged air intake manifold caused all 8 cylinders on the right-hand side of the diesel engine to burn a rich mixture of fuel and air.10 In addition, the broken fuel injector continued to deliver unatomized fuel to the cylinder. This allowed unburned fuel to enter the exhaust manifold, where it was ignited by the hot exhaust gases before exiting the exhaust stack. 1.7.2 Maintenance history At CP, locomotive engines undergo a complete overhaul at regular intervals, usually around 5 to 7 years. For the model of engine used in locomotive CP 9779, an overhaul is performed at every interval of 28 000 megawatt-hours. Engine overhauls require a change out of all main components, such as power assemblies. Some parts of the power assemblies, such as rocker arms and exhaust valves, may be replaced with requalified parts rather than new ones. The maintenance of the CP 9779 locomotive is directed and performed by CP personnel, with technical support provided by Wabtec Corporation (Wabtec). Wabtec acts in an advisory capacity. The last engine overhaul of CP 9779 was conducted by CP on 16 December 2017 at its facilities in St. Paul, Minnesota, United States. Since this last overhaul, 10 power assemblies were changed out (more than 60%), and 3 broken power assembly rocker arms were replaced. Table 1 lists the engine repairs made to the locomotive in the last 2 years before the occurrence. Table 1. Engine repairs made to locomotive CP 9779 in the 2 years before the occurrence (Source: Canadian Pacific) Repair notification number Date closed Description provided in repair notification 1002129019 2021-04-19 Excessive smoke 1002129209 2021-04-19 Valve lash* 1002129276 2021-04-19 R3 power assembly changeout 1002129277 2021-04-19 Excessive smoke 1002129294 2021-04-19 R6 broken rocker arm 1002129295 2021-04-19 L6 power assembly changeout 1002101904 2021-02-07 Rocker arm on L6 power assembly replaced 1002097456 2021-02-07 Engine shut down – Hot engine 1001976159 2020-05-18 Engine not loading – Hot engine
10 A rich fuel/air mixture is a mixture in which there is proportionally more fuel than air. In a rich mixture, there is not sufficient air for complete combustion of the fuel.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 14 1001967341 2020-04-20 L2 power assembly changeout 1001960689 2020-04-07 Engine not loading – Hot engine 1001929772 2020-01-17 All injectors changed out 1001906118 2019-11-09 R8 power assembly connecting rod replaced 1001906152 2019-11-09 L8 power assembly connecting rod removal 1001906154 2019-11-09 R4 power assembly changeout 1001905028 2019-11-09 Crankcase overpressure *A valve lash refers to the “available clearance or gap between the rocker arm and the tip of the valve stem when the lifter for that valve is sitting on the base circle of the cam lobe.” (Source: MotorTrend magazine, “How to Set a Valve Lash” at https://www.motortrend.com/how-to/1707-how-to-set-valve- lash/#:~:text=Valve%20lash%20is%20the%20available,intended%20to%20be%20fully%20closed [last accessed on 04 June 2022]). Note: The table does not include all 10 power assemblies changed out in the 3.5 years between the last engine overhaul and the date of the occurrence. 1.7.3 Regulatory inspections CP locomotives are used on the railway's network in Canada and the United States (U.S.) and must be compliant with Transport Canada regulations, as well as regulations of the U.S. Federal Railroad Administration. Under these regulations, the following locomotive inspections are required: • A pre-departure safety inspection – this inspection includes checking for any apparent safety hazard, verifying the operation of hand brakes, headlights, and ditch lights, and performing a visual inspection of trucks and running gear. In addition, an air brake test, which covers the operation of the safety control system, must be performed.11 • A qualified locomotive mechanical inspection (QLMI) once every 30 days – this is a visual inspection of the locomotive cab, the trucks, the safety appliances and the air brakes. It does not include an inspection of the diesel engine or the engine room.12 • A periodic general inspection at least once every 92 days – on locomotives equipped with advanced on-board electronic condition-monitoring controls that are microprocessor-based, as in this occurrence, this inspection must be conducted at least once every 184 days. The periodic general inspection includes all mechanical gauges used by the locomotive operator to aid in controlling and braking the train or locomotive, as well as all electrical devices, visible insulation, alerters, and remote control locomotive system components. In addition, all cable connections between locomotives and jumpers that are designed to carry 600 volts or more must be thoroughly cleaned, inspected and tested for continuity.13
11 Transport Canada, Railway Locomotive Inspection and Safety Rules, Appendix I - Pre-Departure Inspection by a Locomotive Operator or Other Qualified Person, available at https://tc.canada.ca/en/rail- transportation/rules/railway-locomotive-inspection-safety-rules/appendix-i-ii-railway-locomotive- inspection-safety-rules (last accessed 08 August 2023). 12 United States Code of Federal Regulations (CFR), Title 49, Part 229.23 – Periodic inspection: general (December 2012). 13 Ibid.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R21V0144 ■ 15 • An annual inspection at intervals that do not exceed 368 days – this inspection covers the following: • load meters that indicate electric current being applied to the traction motors; • all devices that are used by the locomotive operator to aid in controlling and braking the train or locomotive and which provide an electronic indication of air pressure; • microprocessor-based event recorders; and • air brake system (calibration, maintenance and testing).14 The last QLMI was performed on CP 9779 on 08 July 2021, the day of the occurrence, at the locomotive repair shop in Golden; no defects were noted. The last periodic inspection was conducted on 08 February 2021; the locomotive passed the inspection. The last annual inspection was conducted on 31 July 2020; the locomotive passed the inspection. 1.8 System health monitoring System health monitoring provides data on the status of a system, which allows operators to take action when the information provided indicates an abnormal condition. DP systems, such as was used on the train in this occurrence, have limited health monitoring capabilities and can provide basic information on the status of remote locomotives. For more advanced remote health monitoring, independent software solutions are also available. 1.8.1 Health monitoring on distributed power systems DP systems enable an LE to monitor the following remote locomotive functions from the lead locomotive: • throttle position and tractive effort generated • dynamic brake operation through braking effort generated • automatic brake operation through brake pipe pressure readings • independent brake operation through locomotive brake cylinder pressure readings • equalizing reservoir pressure • main reservoir pressure • airflow These systems also provide the LE with an alarm notification for the DP remote locomotive in the form of a red square on the multi-function display. The various abnormal operating and fault condition alarms that can occur on a DP remote locomotive are streamlined and essentially grouped together by the on-board DP control system; they are then treated as a single “trainline fault” condition. The LE must attempt to diagnose the alarm situations from the available information.
14 United States Code of Federal Regulations (CFR), Title 49, Part 229.27 – Annual tests (April 2012).
TRANSPORTATION SAFETY BOARD OF CANADA ■ 16 In contrast, an abnormal operating or fault condition occurring on the lead controlling locomotive triggers a descriptive alarm message about the specific fault condition, such as: • wheel slip • locked axle • dynamic brake fault condition warning • electronic air brake loss of communication • end-of-train motion and loss of communication Modern freight locomotives in operation are not equipped with remote sensing capability to monitor for common types of locomotive fires, such as exhaust stack fires, engine room fires, traction motor fires, and electrical compartment fires. 1.8.2 Third-party remote health monitoring systems Many railways use third-party equipment integrated into their locomotives control and mechanical systems to transmit select data from the locomotive to a central data processing centre. Examples of this type of solution include PowerView Connect by Progress Rail and the Violet Edge platform by Wi-Tronix. These systems, which are in widespread use in North America, enable a railway to remotely monitor how its trains are being operated and can provide valuable technical information about locomotive performance, including diesel engine performance. However, these systems have not been designed to record and transmit data specific to the presence of fires on locomotives operating in a remote position in a train consist. CP 9779 was not equipped with a third-party health monitoring system. 1.8.3 Wayside inspection systems North American railways use strategically located wayside inspection systems to monitor select safety-critical parameters as trains pass, such as the temperature of rail car wheels and bearings, and the presence of dragging equipment. In CP operations, hot wheel and bearing detectors on main track are typically spaced 20 to 25 miles, but not more than 40 miles, apart. Wayside detectors are not equipped with cameras or heat sensors to detect common types of locomotive fires. 1.9 Regulatory requirements for train inspections Rule 110 of the CROR, Inspecting Passing Trains and Transfers, sets the requirements for the inspection of passing trains or transfers by train crews of standing trains and other employees. It also provides guidance to crews on trains being inspected to be on the lookout for the results of passing inspections. Rule 110 states: (a) When duties and terrain permit, at least two crew members of a standing train or transfer and other employees at wayside must position themselves on the ground on both sides of the track to inspect the condition of equipment in
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R21V0144 ■ 17 passing trains and transfers. When performing a train or transfer inspection, the locomotive engineer will inspect the near side. When a group of wayside employees is present, at least two employees must perform the inspection. EXCEPTION: Crew members of passenger trains are exempted from the above requirements except when standing at meeting points in single track territory. However, every effort must be made to stop a train or transfer when a dangerous condition is noted. (b) Employees inspecting the condition of equipment in a passing freight train or transfer must, when possible, broadcast the results of the inspection. (c) Every effort must be made to stop a passing train or transfer if a dangerous condition is detected. Each crew member of a train or transfer must be alert at all times for a stop signal or communication given by an employee. The report to the train or transfer being inspected must state only the location of the dangerous condition and what was observed and not speculate as to the cause. (d) When a crew member is located at the rear of a train or transfer, a front crew member must, when practicable, notify the rear crew member of the location of employees in position to inspect their train or transfer.15 CROR Rule 111, Train and Transfer Inspection, establishes the requirements for the inspection of trains by the on-board operating crew. It states, in part: (c) All crew members on a moving train or transfer must make frequent inspections of both sides to ensure that it is in order.16 Fires on locomotives located in a remote position in a train consist are not usually within the line of sight of the train crew from their position in the cab of the lead locomotive. Mid- train DP locomotives are often thousands of feet from the lead locomotive and end-of-train DP locomotives can be a few miles behind the lead locomotive. Unless a train is being operated through flat, open terrain with long gentle curves, the mid or rear DP remote locomotives will remain out of sight of the train crew. Additionally, some locomotive fires may only be visible during running inspections at night. 1.10 Canadian Pacific instructions related to train operations during fire season With respect to fire prevention during the fire season, CP’s General Operating Instructions for Canadian operations state: 28.0 Fire Season and Prevention 28.1 Locomotives that idle for extended periods, tend to discharge sparks from the exhaust stack. 28.2 Actions which will help reduce sparks: Where locomotives may have been idling for extended periods, it is beneficial to advance the throttle to notch 5 for at least ten (10) minutes before working the
15 Transport Canada, Canadian Rail Operating Rules (24 April 2020), Rule 110: Inspecting Passing Trains and Transfers. 16 Ibid., Rule 111: Train and Transfer Inspection.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 18 locomotives under heavy load. Extra care is required near open top sulphur trains. If spark emissions do occur, decrease throttle to reduce the distance that sparks may be thrown. This will also help reduce the size and heat content of the sparks. Enroute, to minimize sparks;
- if the locomotives have been “drifting” in IDLE or operated in low throttle
positions for several miles, it is beneficial to advance the throttle slowly, one notch at a time.
- use dynamic brake. It should be considered the primary choice of retardation,
and
- use contour braking/throttle modulation by allowing the natural resistance of
grade, curvature and friction to slow the train. 28.3 Whenever possible, if a locomotive is suspected of starting fires, it must be shut down to prevent further damage to right of way or adjacent areas. Report accordingly on the Crew Information Form and notify Mechanical Facilities. 28.4 Train Crews should be particularly alert to detect any evidence of excessive spark emission from locomotives or the train. 28.5 When yard locomotives are moved on freight trains, they must be moved dead or isolated to their destination. They must not be restarted or operated by train crews enroute.17 1.11 Railway Extreme Heat and Fire Risk Mitigation Rules To address the risks of fire in extreme heat conditions, the Railway Association of Canada proactively developed the Railway Extreme Heat and Fire Risk Mitigation Rules, which it filed on its own initiative with the Minister of Transport pursuant to subsection 20(1) of the Railway Safety Act. On 15 June 2022, Transport Canada enacted the new rules, with the following stated objectives: 2.1 These rules are intended to ensure that companies have: a. Mitigating measures to protect safe railway operations and the infrastructure during periods of extreme heat; b. Appropriate methods in place to detect and to prevent the starting of fires during periods of Extreme Fire Danger Levels; and c. Mitigating measures for fires that may be started on railway rights-of-way during periods of Extreme Fire Danger Levels. 2.2 Section 6 and Section 7 of these rules supplement the requirements of the Prevention and Control of Fires on Line Works Regulations.18
17 Canadian Pacific, General Operating Instructions (GOI) – Canada (effective 14 October 2015 and revised 06 September 2018), Section 1: Locomotive and Train Operations – Train Handling, sub-section 28.0: Fire Season and Prevention, pp. 14–15. 18 Transport Canada, Railway Extreme Heat and Fire Risk Mitigation Rules (15 June 2022), Section 2.0: Objectives.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R21V0144 ■ 19 With respect to locomotive inspection requirements, the rules state: 6.1 Companies shall ensure the entire exhaust system of root blower locomotives is inspected and cleaned at intervals not to exceed 30 days. These inspections shall be conducted by a qualified person. A record of the inspection shall be retained for at least 90 days. 6.2 Companies shall ensure that locomotives equipped with turbocharged engines have had their entire exhaust system inspected and cleaned at intervals not to exceed: a. 92 days for turbocharged engines equipped with mechanical fuel injection b. 184 days for turbocharged engines equipped with electronic fuel injection These inspections shall be conducted by a qualified person. A record of the inspection shall be retained until the next required inspection has been completed.19 In addition, with respect to requirements for a fire risk mitigation plan for the prevention of fires on railway ROWs, the rules also state: 7.1 Each company must develop and adhere to an Extreme Weather Fire Risk Mitigation Plan (Fire Risk Mitigation Plan) that will be in effect during the fire season. 7.2 The Fire Risk Mitigation Plan must include, at a minimum, measures to: a. Monitor fire risk levels; b. Detect and report fires along the right-of-way including reporting by the public of fires on rights-of- way to railway companies; c. During periods of Extreme Fire Danger Levels, for each railway company that operates or maintains the line work, to manage vegetation, including the removal of combustible materials or debris from the right-of-way being generated through vegetation management activities; d. During periods of Extreme Fire Danger Levels, for each railway company that operates or maintains the line work, to mitigate fire hazards during line work maintenance activities; e.g., rail cutting, welding, rail grinding; and respond to fires resulting from such activities, if needed. Except in the case of emergencies or where required to maintain safe railway operations, mitigations may include restricting or stopping certain line work maintenance activities as appropriate; e. Assess conditions and implement appropriate mitigations during active fire events on or encroaching on the right-of-way to maintain safe railway operations, including adjustments to train operations; and f. Respond to detected or reported fires, which could include immediate action to suppress the fire, communication to and/or deployment of appropriate emergency response resources. Emergency response resources may include external parties such as first responders and/or fire services. 7.3 Companies must file their Fire Risk Mitigation Plan with Transport Canada within 30 days after the date on which these Rules come into force. Any subsequent
19 Ibid., Section 6.0: Locomotive inspection requirements.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 20 revisions to the plan must be filed with transport Canada before the revisions become effective.20 These rules were not in effect at the time of this occurrence. 1.12 Third-party reporting of locomotive fires CP posts contact information for its Public Safety Communications Centre at all public crossings. In addition, the contact information is available on CP’s website. The communication centre is open 24 hours a day to respond to emergencies. It can directly access the Operations Centre when immediate action to stop a train is required. Members of the public who observe locomotive fires, and other emergencies, can report the situation directly to the communications centre by way of the posted telephone number. Alternatively, emergency calls from the public can be routed through local 911 services. Such services, in jurisdictions traversed by CP’s railway tracks, have been provided with the coordinates to the communications centre. In this occurrence, the trackside fire near the Caithness Road public crossing was reported by a concerned citizen through the local 911 service; the emergency service then relayed the information to CP. 1.13 Reporting of fires to the TSB The Transportation Safety Board Regulations, pursuant to the Canadian Transportation Accident Investigation and Safety Board Act, list the types of railway occurrences that are required to be reported to the TSB. It states, in part: Railway Occurrences Report to Board 5 (1) The operator of the rolling stock, the operator of the track and any crew member that have direct knowledge of a railway occurrence must report the following railway occurrences to the Board: … the rolling stock or its contents … cause or sustain a fire or explosion, […]21
20 Ibid., Section 7.0: Requirements for a fire risk mitigation plan for the prevention of fires on railway rights-of- way. 21 Transportation Safety Board of Canada, Transportation Safety Board Regulations, SOR/2014-37 (last amended on 23 November 2018), Part 1: Reports, Mandatory Reporting, Railway Occurrences, sub-part 5(1): Report to Board.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R21V0144 ■ 21 A review of fires reported to the TSB over the 10-year period prior to the occurrence identified 34 locomotive fires involving DP mid-train or tail-end remote locomotives, 3 of which are confirmed to have caused ROW fires. Between the date of the occurrence and the end of June 2023, there have been an additional 21 fires on DP mid-train or tail-end remote locomotives reported to the TSB.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 22 2.0 ANALYSIS The manner in which the train was operated and the condition of the track were not contributory to this occurrence. The analysis will focus on the locomotive engine failure, the resultant locomotive and trackside fires, and the absence of locomotive health monitoring capability to detect fires on distributed power (DP) locomotives in a remote position in a train consist (remotely located locomotives). 2.1 The occurrence On 08 July 2021, Canadian Pacific Railway Company (CP) train 880-066 was travelling eastward on the Cranbrook Subdivision near Caithness when its mid-train DP locomotive sustained a mechanical failure that resulted in flames emanating from the exhaust stack. It is likely that hot embers were emitted from the exhaust stack on the damaged locomotive, ignited vegetation and caused a trackside fire near Caithness. Due to the remote position of the locomotive in the train consist, the situation went undetected until the condition was observed by the crew of an opposing CP train (V09-012) during a meet at the siding in Elko, about 5 miles east of Caithness. They saw that flames were coming out of the exhaust stack on the eastbound train’s mid-train locomotive. 2.2 Engine failure and fire on CP 9779 A follow-up mechanical inspection at Sparwood (Mile 17.7, Cranbrook Subdivision) determined that the R8 power assembly on the diesel engine of mid-train remote locomotive CP 9779 had suffered a catastrophic failure. Subsequent mechanical examination of the locomotive found a broken rocker arm on the R8 power assembly. An exhaust valve was found broken with its head badly damaged and the stems on the remaining exhaust valve and both intake valves were bent. The fuel injector tip was found broken off. It was determined that an exhaust valve, which showed evidence of valve seat recession, had failed; its head dropped into the combustion chamber while the engine was in operation, breaking off the tip of the fuel injector. As evidenced by the bent valves stems on the remaining valves, the rocker arm failed either after or during its associated valve’s impact with the broken exhaust valve head. The air intake manifold was also damaged. This resulted in a loss of pressure in the air supplied to the 8 cylinders on the right-hand side of the diesel engine and, consequently, the fuel–air mixture supplied to these cylinders contained more fuel than normal. In addition, the broken fuel injector continued to deliver unatomized fuel to the combustion chamber and hence out through the open exhaust valve port. Unburned fuel was discharged through the exhaust ports to the exhaust manifold, where it was ignited by the hot engine exhaust gases before being expelled through the exhaust stack.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R21V0144 ■ 23 Finding as to causes and contributing factors An exhaust valve on the R8 power assembly of mid-train remote locomotive CP 9779 failed, resulting in the head of the valve dropping into the combustion chamber, damaging a fuel injector and causing the rocker arm of the adjacent exhaust valve to fail while the engine was in operation. Subsequently, unburned fuel entered the exhaust manifold, where it was ignited by the hot engine exhaust gases before being expelled through the exhaust stack. 2.2.1 History of power assembly replacements on CP 9779 At CP, locomotive engines undergo a complete overhaul at regular intervals, usually around 5 to 7 years. For locomotive CP 9779, an overhaul is performed at every interval of 28 000 megawatt-hours. The last overhaul for CP 9779 was in late 2017. Maintenance records indicate that CP 9779 had 10 out of 16 power assemblies changed out since its last engine overhaul and that exhaust valve seat recession had been previously found when CP serviced this unit. The TSB does not collect data on locomotive power assembly failures. Finding: Other More than 60% of the power assemblies on locomotive CP 9779 were replaced in about 3.5 years, which corresponds to around half of the engine overhaul cycle. 2.3 Trackside fire near the Caithness Road public crossing When the mid-train locomotive was travelling in the area of the Caithness Road public crossing, its engine was in high throttle position (6 to 8) as the train was ascending a 1% grade. At high throttle, gases exit the exhaust stack at an elevated rate and pressure. If there are hot embers in the exhaust stack, they are driven further into the air. When driven with sufficient force, airborne embers can be projected to the side of the track, depending on the presence of cross winds and the turbulence created by the moving train. In hot, dry weather conditions, when the risk of wildfire is high, as in this occurrence, the hot embers have the potential to ignite the surrounding vegetation and cause a fire. Although there is no photographic evidence of embers in this occurrence, in the absence of another confirmed source of ignition, and given that the right-of-way (ROW) fire was reported shortly after the passage of the train, it is likely that the exhaust stack fire contained carbon-based materials that migrated to the ROW and started the fire. Finding as to causes and contributing factors Flames and embers exiting the mid-train locomotive’s exhaust stack likely resulted in the hot embers falling on the vegetation along the track west of the Caithness Road crossing. The danger of wildfire was high in the area, and the embers ignited the vegetation on the ROW, causing a fire which spread to adjacent land on the north side of the track. The fire near Caithness Road public crossing was observed and reported to 911 in a timely manner. This enabled a rapid response by the local fire department. The BC Wildfire Service was also immediately notified, and responded with airborne support.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 24 Finding: Other Despite the fire’s growth in high fire danger conditions, it was quickly brought under control and extinguished by the local fire department and the BC Wildfire Service. 2.4 Locomotive health monitoring Locomotive CP 9779 was a DP remote locomotive operated in the mid-train position. On a train handling a large number of cars (the occurrence train was handling 152 cars), mid- train locomotives are not usually within the line of sight of the train crew from their position in the cab of the lead locomotive. On DP systems, fault monitoring information for remote locomotives is displayed to the LE on the lead locomotive. It is represented as a single generic alert, with no information to help diagnose the cause of the fault. Fires on remote locomotives do not trigger the generic alert, unless they lead to a mechanical fault. Consequently, these fires can go unnoticed by the crew members. Although DP systems provide limited fault monitoring information for locomotives operating in remote positions, more advanced health monitoring solutions exist, such as PowerView Connect by Progress Rail and the Violet Edge platform by Wi-Tronix. These systems, which are in widespread use in North America, enable a railway to remotely monitor how its trains are being operated and can provide valuable technical information about locomotive performance, including diesel engine performance. However, they have not been designed to record and transmit data specific to the presence of fires on remote locomotives. Remotely located locomotives are not equipped with sensors to detect common types of locomotive fires, such as engine room fires, exhaust stack fires, traction motor fires, and electrical compartment fires. Locomotives are not currently equipped with systems to alert crew members to locomotive fires. Therefore, the industry currently relies on inspections of passing trains by railway employees, and on reports made by the public to identify fires. North American railways use strategically located wayside inspection systems to monitor selected safety-critical parameters as trains pass. These systems typically monitor for hot wheels/bearing, as well as dragging equipment. In CP operations, hot wheel and bearing detectors on main track are typically spaced 20 to 25 miles, but not more than 40 miles, apart. Industry has not yet leveraged these installations to enable inspection for locomotive fires, either through camera-based visual inspection or sensor-based heat detection.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R21V0144 ■ 25 Finding as to risk Until technologies are implemented to detect fires on remotely located locomotives, there is a risk that those fires will remain undetected using existing methods, which could lead to trackside fires or damage to the rolling stock. 2.5 Railway and regulatory requirements based on fire danger The Province of British Columbia uses the Canadian Forest Fire Danger Rating System to rate fire danger, i.e., the risk of a wildfire starting. At the time of the occurrence, the fire danger was rated as high for the Elko area, where the train was travelling in this occurrence, and it transitioned to extreme the following day. CP’s General Operating Instructions provide guidance to train crews on best practices during fire season to avoid emitting sparks from a locomotive. These instructions require that locomotives be shut down when it becomes known that they are emitting sparks or embers. However, in the case of DP train operations, crews are often unaware of conditions affecting the remotely located locomotives until trackside employees or members of the public observe and report such conditions. At the time of the occurrence, there were no regulatory restrictions on the operation of a train with remotely located locomotives based on fire danger rating, nor were there requirements specific to the continuous monitoring of these locomotives for fires. Finding as to risk In areas susceptible to wildfires due to weather conditions, if there are no railway or regulatory restrictions on the operation of trains with remotely located locomotives, on which sources of ignition can go undetected for extended periods, there is an increased risk that these sources of ignition will migrate to and ignite surrounding terrain.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 26 3.0 FINDINGS 3.1 Findings as to causes and contributing factors These are conditions, acts or safety deficiencies that were found to have caused or contributed to this occurrence.
- An exhaust valve on the R8 power assembly of mid-train remote locomotive CP 9779
failed, resulting in the head of the valve dropping into the combustion chamber, damaging a fuel injector and causing the rocker arm of the adjacent exhaust valve to fail while the engine was in operation. Subsequently, unburned fuel entered the exhaust manifold, where it was ignited by the hot engine exhaust gases before being expelled through the exhaust stack.
- Flames and embers exiting the mid-train locomotive’s exhaust stack likely resulted in
the hot embers falling on the vegetation along the track west of the Caithness Road crossing. The danger of wildfire was high in the area, and the embers ignited the vegetation on the right-of-way, causing a fire which spread to adjacent land on the north side of the track. 3.2 Findings as to risk These are conditions, unsafe acts or safety deficiencies that were found not to be a factor in this occurrence but could have adverse consequences in future occurrences.
- Until technologies are implemented to detect fires on remotely located locomotives,
there is a risk that those fires will remain undetected using existing methods, which could lead to trackside fires or damage to the rolling stock.
- In areas susceptible to wildfires due to weather conditions, if there are no railway or
regulatory restrictions on the operation of trains with remotely located locomotives, on which sources of ignition can go undetected for extended periods, there is an increased risk that these sources of ignition will migrate to and ignite surrounding terrain. 3.3 Other findings These items could enhance safety, resolve an issue of controversy, or provide a data point for future safety studies.
- More than 60% of the power assemblies on locomotive CP 9779 were replaced in about
- 5 years, which corresponds to around half of the engine overhaul cycle.
- Despite the fire’s growth in high fire danger conditions, it was quickly brought under
control and extinguished by the local fire department and the BC Wildfire Service.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R21V0144 ■ 27 4.0 SAFETY ACTION 4.1 Safety action taken 4.1.1 Canadian Pacific To comply with Ministerial Order (MO) 21-06 issued on 11 July 2021, in which Transport Canada required railways to implement measures to increase their capacity to detect, monitor, and suppress fires, Canadian Pacific Railway Company (CP) implemented the following: • A measure ensuring that no locomotive is operated through areas where the fire danger is rated as extreme, unless it has been inspected in the previous 15 days. This measure is to ensure that the locomotive’s exhaust passages are clear of combustible material, including oil accumulation and carbonaceous deposits in excess of ⅛ inch in thickness. • Extreme weather fire risk mitigation plans that address fire detection, monitoring, and response measures. • Enhanced vegetation control measures along the right-of-way (ROW), including: • A guidance document for the management of forest fuel load that may develop as a direct result of vegetation management activities. • The removal of debris resulting from tree and vegetation work, or the disposition of the debris by mechanical mulching or chipping. • Guidelines for fuel management to contractors who perform vegetation management services on behalf of CP. 4.2 Safety concern 4.2.1 Monitoring for fires on locomotives operating in a remote position in a train consist Modern freight locomotives are not equipped with real-time sensors to monitor, detect, and automatically communicate locomotive fires, such as exhaust stack fires, engine room fires, traction motor fires, or electrical compartment fires. Therefore, the industry currently relies on inspections of passing trains by railway employees, and on reports made by the public, to identify and report a fire condition, particularly when the fire occurs on an unmanned locomotive operating in a remote position in a train consist (remotely located locomotive). This creates a risk that an on-board fire will go undetected for an extended duration, potentially migrating to the ROW and beyond. Many railways use third-party equipment integrated into their locomotives’ control and mechanical systems to wirelessly transmit select data from the various locomotives operating on a train to a central data processing centre. These systems, which are in widespread use in North America, enable a railway to remotely monitor the operation of locomotives and can enable real-time monitoring of technical information (diagnostics, customizable alerts, etc.) about locomotive health, including diesel engine performance.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 28 However, these systems have not been designed to detect the presence of locomotive fires and to alert train crews. In addition, North American railways use strategically located wayside inspection systems to monitor select safety-critical parameters as trains pass by, such as the temperature of rail car wheels/bearings and the presence of dragging equipment. However, these wayside detectors are not equipped with cameras or heat sensors to detect fire on a passing train, and more specifically a fire on a remotely located locomotive. While fires on remotely located locomotives are not uncommon, they do not often migrate to the railway ROW. A review of fires reported to the TSB over the 10-year period prior to the occurrence identified 34 locomotive fires involving DP mid-train or tail-end remote locomotives, 3 of which are confirmed to have caused ROW fires. Between the date of the occurrence and the end of June 2023, there have been an additional 21 fires on DP mid-train or tail-end remote locomotives reported to the TSB. According to the TSB Regulations, fires must be reported to the TSB if they are attributable to the operation of rolling stock, as determined by the railway; however, establishing a causal link to ROW fires can often be difficult. For this reason, the frequency and number of ROW fires caused by rolling stock, including fires caused by remote locomotives, could be higher than reported to the TSB. If such fire events were to spread to the ROW and beyond at a time of high or extreme fire danger, the consequences could be catastrophic to people, property, and the environment. To address the risks of fire during times of extreme fire danger, the Railway Extreme Heat and Fire Risk Mitigation Rules have been developed by the railway industry and approved by the Minister of Transport. The new rules came into effect on 15 June 2022. Among other requirements, these rules are intended to ensure that railway companies have “[a]ppropriate methods in place to detect and to prevent the starting of fires during periods of Extreme Fire Danger Levels.”22 These rules also require that each railway company have a fire risk mitigation plan in effect during the fire season, and that such a plan include measures to “[d]etect and report fires along the right-of-way including reporting by the public of fires on rights-of-way to railway companies.”23 The Board is encouraged by the initiative the rail industry has taken in developing the Railway Extreme Heat and Fire Risk Mitigation Rules, and it looks forward to improved management of the risks associated with railway operations during the fire season. However, there currently is insufficient data available for the TSB to assess the full impact of the new rules on reducing on-board fires and ROW fires. Early detection of locomotive fires would allow for prompt intervention to prevent the spread of these fires to the ROW. Until technologies are implemented to detect fires on remotely located locomotives, there is a risk that those fires will remain undetected using
22 Transport Canada, Railway Extreme Heat and Fire Risk Mitigation Rules (15 June 2022), Section 2.0: Objectives. 23 Ibid., Section 7.0: Requirements for a fire risk mitigation plan for the prevention of fires on railway rights-of- way.
RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R21V0144 ■ 29 existing methods, which could lead to trackside fires that extend beyond the ROW or damage to the rolling stock. Therefore, the Board is concerned that steps have not been taken to leverage and expand the use of existing on-board locomotive systems to monitor remotely located locomotives for common types of fires while trains are in operation. This report concludes the Transportation Safety Board of Canada’s investigation into this occurrence. The Board authorized the release of this report on 02 August 2023. It was officially released on 24 August 2023. Visit the Transportation Safety Board of Canada’s website (www.tsb.gc.ca) for information about the TSB and its products and services. You will also find the Watchlist, which identifies the key safety issues that need to be addressed to make Canada’s transportation system even safer. In each case, the TSB has found that actions taken to date are inadequate, and that industry and regulators need to take additional concrete measures to eliminate the risks.
FD06117 | 2021_加拿大运输安全委员会_CP机车引擎起火引燃路旁植被_埃尔科_R21V0144_火灾报告(英文).md
分类:06_境外及港澳台调查报告 | 年份:2021 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:md
加拿大 TSB | CP 机车引擎起火引燃路旁植被调查(R21V0144)
基本情况 / Incident summary
- 时间:2021年7月8日
- 运营方:加拿大太平洋铁路公司(CP),货运列车 880-066,Cranbrook 支线 Mile 54.3,不列颠哥伦比亚省 Caithness 附近。
- 事件:列车东行时,位于列车中部(mid-train distributed power locomotive)的分布式动力机车发生机械故障,排气管(exhaust stack)喷出一团火焰。由于该机车位于列车编组中较隐蔽的位置(remote position),故障直到约 5 英里外 Elko 侧线会车时,被对向 CP 列车(V09-012)乘务组发现才被察觉。
- 后果:受损机车排气管喷出的高温余烬(hot embers)很可能引燃植被,在 Caithness 附近造成路旁火灾(trackside fire)。火灾由公众报告,蔓延至 1.2 公顷,由当地志愿消防队在 BC Wildfire Service 协助下扑灭。该区段轨道未受损。无危险品、无人员伤亡。
原因 / Cause and findings
- 中部分布式动力机车机械故障导致排气管喷火;因机车位于列车编组中隐蔽位置,火情长时间未被本列车组察觉。
- 喷出的高温余烬引燃路旁植被,形成路旁火灾。
安全关注 / Safety concern
TSB 提出安全关注(Safety concern):对位于列车编组中隐蔽(remote)位置的机车,缺乏火灾监测手段(Monitoring for fires on locomotives operating in a remote position in a train consist)。
安全提示
凸显对分布式/隐蔽位置机车进行火灾监测与早期探测的重要性。
FD06118 | 2022_加拿大_TSBC_A22Q0116_Aviation_Wing_Separation_Fire_2022.pdf
分类:06_境外及港澳台调查报告 | 年份:2022 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
AIR TRANSPORTATION SAFETY INVESTIGATION REPORT A22Q0116 IN-FLIGHT SEPARATION OF LEFT WING Privately registered Wag-Aero Sportsman 2+2 (amateur-built floatplane), C-FFDA Rivière Bonnard Aerodrome, Quebec, 13 NM WSW 23 September 2022 The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. This report is not created for use in the context of legal, disciplinary or other proceedings. See the Terms of use at the end of the report. History of the flight At approximately 08301 on 23 September 2022, the Wag-Aero Sportsman 2+2 amateur-built floatplane (registration C-FFDA, serial number 792), with the pilot and 1 passenger on board, took off from Lake Mylène, 12 nautical miles west of the Rivière Bonnard Aerodrome (CRB4), Quebec, to conduct a local visual flight rules flight. Approximately 4 nautical miles south of Lake Mylène, the floatplane’s left wing separated completely, resulting in an uncontrolled descent of the floatplane, which then struck the terrain. The 2 occupants were fatally injured. The floatplane was destroyed by the force of the impact. There was no post-impact fire. The 406 MHz emergency locator transmitter activated, and the Cospas-Sarsat search and rescue satellite system detected the signal at 0846.
1 All times are Eastern Daylight Time (Coordinated Universal Time minus 4 hours).
TRANSPORTATION SAFETY BOARD OF CANADA | 2
Weather information According to Environment and Climate Change Canada observations for the area of CRB4, located 13 NM east-northeast of the accident site, winds were from the west-northwest between 13 and 17 km/h (7 to 9 knots) between 0800 and 0900 on the day of the occurrence. The temperature was 4 °C, and the dew point was 2 °C. The graphic area forecasts valid at the time of the occurrence indicated moderate mechanical turbulence between the surface and 3000 feet above ground level (AGL) and, occasionally, towering cumulus clouds topped at 14 000 feet above sea level, ceilings at 1200 feet AGL, and visibility of 2 to 5 statute miles in light rain and snow showers and/or mist. Pilot information The pilot held the appropriate licence and ratings to conduct the occurrence flight in accordance with existing regulations: he had a private pilot licence issued in 1989 and a valid Category 3 medical certificate. The pilot had accumulated over 4400 flight hours, almost all of them on the occurrence aircraft. According to information gathered during the investigation, there was no indication that the pilot’s performance was affected by medical or physiological factors. Aircraft information The aircraft—an amateur-built floatplane—had been built by the occurrence pilot in 1989. According to the aircraft’s journey log, on 04 September 2022, the aircraft had accumulated 4422 flight hours since it was built. The floatplane was equipped with a 200 hp Avco Lycoming IO-360- A1B6 engine (serial number L- 59367A). Each wing was supported by 2 main wing struts and 2 secondary wing struts (Figure 1). Accident site and wreckage examination The floatplane’s left wing was found approximately 300 feet away from the wreckage. It was heavily damaged. The aft main wing strut was practically intact and was still attached, but the clevis that attached the strut to the fuselage was corroded and had a clean break. The other main strut (the forward main strut) normally found on the same wing was missing and was not found at Figure 1. Occurrence aircraft (Source: aircraft owner, with TSB annotations)
AIR TRANSPORTATION SAFETY INVESTIGATION REPORT A22Q0116 | 3 the site. Nearly all of the attachment points, hinges, and flight control linkages on the left wing showed significant signs of corrosion.2 The floatplane wreckage came to rest inverted. Damage to the floats and the engine was symmetrical, a sign that the aircraft was not rolling when it struck the ground. The right wing severed a small tree. The distance between this tree and the wreckage suggests a nose-down angle of approximately 60° when the aircraft struck the ground. As with the left wing, nearly all of the attachment points, hinges, and flight controls linkages on the right wing, as well as on the aircraft’s tail, showed significant signs of corrosion (Figure 2). Figure 2. Example of corrosion seen on the occurrence aircraft’s tail (Source: TSB)
Technical examination For the purposes of this investigation, the 2 main struts for the right wing (forward and aft), the aft main strut for the left wing, and all clevises attaching the struts to the fuselage were sent to the TSB Engineering Laboratory in Ottawa, Ontario, for examination. The examination revealed that the right strut clevises and aft left strut clevis had failed in overload. The forward left strut clevis showed signs of fatigue cracking. The forward left clevis was examined using a macroscope3 and most of the fracture surface was found to be flat with beachmarks except for a small portion at the end, which was raised and textured (Figure 3, top left image). The clevis was then examined with a scanning electron microscope.4 The flat portion of the fracture surface was found to be heavily obliterated, although
2 Corrosion is a natural phenomenon that attacks metal and can result in the destruction of the metal to the point of making the aircraft unfit for flight. 3 A macroscope is an optical microscope that provides low magnification and large depth of field. 4 A scanning electron microscope produces images of a sample by scanning the surface with a focused beam of electrons.
TRANSPORTATION SAFETY BOARD OF CANADA | 4
some striations and secondary cracking (indicative of fatigue) were observed (Figure 3, lower images). No crack initiation sites were found. The raised and textured area observed macroscopically consisted of ductile dimples (Figure 3, top right image), which is indicative of ductile overload. Figure 3. Fracture surface of the forward left clevis (top left image), ductile dimples (top right) and micrographs showing striations and secondary cracks (lower images) (Source: TSB)
The failure of the forward left clevis likely caused the aft left clevis to fail in overload, which in turn caused the separation of the left wing. An irreversible loss of control then occurred, followed by the collision with the terrain. Aircraft maintenance All aircraft must be maintained in accordance with a maintenance schedule5 that lists the scheduled inspections to be carried out. The depth of these inspections must be “consistent with the general condition and operating role of the aircraft.”6 A maintenance schedule must be approved by the Minister except when the owner of a small aircraft that is not being used for commercial operations decides to comply with appendices B and C of Canadian Aviation Regulations (CARs) Standard 625.
5 Transport Canada, SOR/96-433, Canadian Aviation Regulations, section 605.86. 6 Ibid., Standard 625: Aircraft Equipment and Maintenance Standard, Appendix B: Maintenance Schedules, subsection (5).
AIR TRANSPORTATION SAFETY INVESTIGATION REPORT A22Q0116 | 5 Performance of maintenance tasks One of the requirements in Appendix B states, “[t]he method of inspection for each item on the maintenance schedule shall be in accordance with the manufacturer’s recommendations or standard industry practice.”7 For amateur-built, as well as owner-maintained aircraft, the person who performs the maintenance is not required to hold an aircraft maintenance engineer licence. However, according to the information note in Standard 571, which provides clarification on CAR 571.02, “[p]ersons who perform maintenance or elementary work are required to follow the manufacturer’s recommendations, or equivalent practices.”8 For amateur-built aircraft, maintenance instructions may have been published by the kit provider. These instructions could serve as the basis for a manufacturer (the person who builds the aircraft) who decides to develop specific recommendations.9 Where the manufacturer has not made specific recommendations, standard industry practices are to be used. These practices include, but are not limited to, the methods published by Transport Canada, or a foreign Civil Aviation Authority, the manufacturer of a similar product,[10] or other practices that may be published provided that they are generally accepted by the Canadian aviation industry.11 One standard industry practice consists of using the methods published by the U.S. Federal Aviation Administration (FAA) in Advisory Circular (AC) 43-13.12,13 This circular contains methods and practices that are acceptable for aircraft maintenance when the manufacturer has not provided recommendations. According to the floatplane’s journey log, the occurrence pilot, who was also the builder, had been carrying out annual maintenance inspections since the floatplane was built. There was no indication that these inspections were being performed according to a maintenance schedule or that they complied with specific recommendations or standard industry practices. Over the past 5 years, the TSB has investigated 5 occurrences,14 including this one, which highlighted issues relating to aircraft maintenance. TSB laboratory reports The TSB completed the following laboratory reports in support of this investigation:
7 Ibid., Standard 625: Aircraft Equipment and Maintenance Standard, Appendix B: Maintenance Schedules, subsection (4). 8 Ibid., Standard 571: Maintenance, section 571.02. 9 Wag-Aero did not publish maintenance instructions. 10 According to the kit manufacturer, the Wag-Aero Sportsman 2+2 is a reproduction of the Piper PA-14. (Source: manufacturer’s website, at www.wagaero.com/wag-aero-kit-airplanes/sportsman-2-2.html [last accessed on 16 February 2023]). 11 Transport Canada, SOR/96-433, Canadian Aviation Regulations, Standard 571: Maintenance, section 571.02. 12 Federal Aviation Administration (FAA), Advisory Circular (AC) 43-13-1B, Acceptable methods, techniques, and practices—Aircraft inspection and repair (08 September 1998). 13 Transport Canada does not have a document equivalent to FAA Advisory Circular AC 43-13. 14 TSB air transportation safety investigation reports A21Q0090, A21O0085, A19C0026, and A18O0106.
TRANSPORTATION SAFETY BOARD OF CANADA | 6
• LP098/2022 – Wing strut fractures • LP102/2022 – NVM Recovery - GPS Safety message It is important that owners of amateur-built or owner-maintained aircraft ensure that maintenance work is carried out in accordance with the manufacturer’s recommendations or, in the absence of such recommendations, in accordance with equivalent maintenance practices, such as those described in FAA AC 43-13. This report concludes the Transportation Safety Board of Canada’s investigation into this occurrence. The Board authorized the release of this report on 26 April 2023. Visit the Transportation Safety Board of Canada’s website (www.tsb.gc.ca) for information about the TSB and its products and services. You will also find the Watchlist, which identifies the key safety issues that need to be addressed to make Canada’s transportation system even safer. In each case, the TSB has found that actions taken to date are inadequate, and that industry and regulators need to take additional concrete measures to eliminate the risks.
AIR TRANSPORTATION SAFETY INVESTIGATION REPORT A22Q0116 | 7
ABOUT THIS INVESTIGATION REPORT This report is the result of an investigation into a class 4 occurrence. For more information, see the Policy on Occurrence Classification at www.tsb.gc.ca The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. TERMS OF USE Use in legal, disciplinary or other proceedings The Canadian Transportation Accident Investigation and Safety Board Act states the following: • 7(3) No finding of the Board shall be construed as assigning fault or determining civil or criminal liability. • 7(4) The findings of the Board are not binding on the parties to any legal, disciplinary or other proceedings. Therefore, the TSB’s investigations and the resulting reports are not created for use in the context of legal, disciplinary or other proceedings. Notify the TSB in writing if this investigation report is being used or might be used in such proceedings. Non-commercial reproduction Unless otherwise specified, you may reproduce this investigation report in whole or in part for non-commercial purposes, and in any format, without charge or further permission, provided you do the following: • Exercise due diligence in ensuring the accuracy of the materials reproduced. • Indicate the complete title of the materials reproduced and name the Transportation Safety Board of Canada as the author. • Indicate that the reproduction is a copy of the version available at [URL where original document is available]. Commercial reproduction Unless otherwise specified, you may not reproduce this investigation report, in whole or in part, for the purposes of commercial redistribution without prior written permission from the TSB. Materials under the copyright of another party Some of the content in this investigation report (notably images on which a source other than the TSB is named) is subject to the copyright of another party and is protected under the Copyright Act and international agreements. For information concerning copyright ownership and restrictions, please contact the TSB. Citation Transportation Safety Board of Canada, Air Transportation Safety Investigation Report A22Q0116 (release date). Transportation Safety Board of Canada 200 Promenade du Portage, 4th floor Gatineau QC K1A 1K8 819-994-3741; 1-800-387-3557 www.tsb.gc.ca communications@tsb.gc.ca © His Majesty the King in Right of Canada, as represented by the Transportation Safety Board of Canada, 2023 Air transportation safety investigation report A22Q0116 Cat. No. TU3-10/22-0116E-PDF ISBN: 978-0-660-48448-8 This report is available on the website of the Transportation Safety Board of Canada at www.tsb.gc.ca Le présent rapport est également disponible en français.
FD06119 | 2022_加拿大_TSBC_M22A0258_Engine_Room_Fire_Ferry_Holiday_Island_PE_2022.pdf
分类:06_境外及港澳台调查报告 | 年份:2022 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
PROTECTED B X00X0000-ENG-EXTENSION REPORT TYPE DATE MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ENGINE ROOM FIRE Roll-on/roll-off ferry Holiday Island Wood Islands, Prince Edward Island 22 July 2022
TRANSPORTATION SAFETY BOARD OF CANADA ■ 2 ABOUT THIS INVESTIGATION REPORT This report is the result of an investigation into a class 2 occurrence. For more information, see the Policy on Occurrence Classification at www.tsb.gc.ca The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. TERMS OF USE Use in legal, disciplinary or other proceedings The Canadian Transportation Accident Investigation and Safety Board Act states the following: • 7(3) No finding of the Board shall be construed as assigning fault or determining civil or criminal liability. • 7(4) The findings of the Board are not binding on the parties to any legal, disciplinary or other proceedings. Therefore, the TSB’s investigations and the resulting reports are not created for use in the context of legal, disciplinary or other proceedings. Notify the TSB in writing if this investigation report is being used or might be used in such proceedings. Non-commercial reproduction Unless otherwise specified, you may reproduce this investigation report in whole or in part for non-commercial purposes, and in any format, without charge or further permission, provided you do the following: • Exercise due diligence in ensuring the accuracy of the materials reproduced. • Indicate the complete title of the materials reproduced and name the Transportation Safety Board of Canada as the author. • Indicate that the reproduction is a copy of the version available at [URL where original document is available]. Commercial reproduction Unless otherwise specified, you may not reproduce this investigation report, in whole or in part, for the purposes of commercial redistribution without prior written permission from the TSB. Materials under the copyright of another party Some of the content in this investigation report (notably images on which a source other than the TSB is named) is subject to the copyright of another party and is protected under the Copyright Act and international agreements. For information concerning copyright ownership and restrictions, please contact the TSB. Citation Transportation Safety Board of Canada, Marine Transportation Safety Investigation Report M22A0258 (released 23 July 2025). Transportation Safety Board of Canada 200 Promenade du Portage, 4th floor Gatineau QC K1A 1K8 819-994-3741; 1-800-387-3557 www.tsb.gc.ca communications@tsb.gc.ca © His Majesty the King in Right of Canada, as represented by the Transportation Safety Board of Canada, 2025 Marine transportation safety investigation report M22A0258 Cat. No. TU3-12/22-0258E-PDF ISBN: 978-0-660-77859-4 This report is available on the website of the Transportation Safety Board of Canada at www.tsb.gc.ca Le présent rapport est également disponible en français.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 4 Table of contents 1.0 Factual information ............................................................................................... 10 1.1 Particulars of the vessel .........................................................................................................................10 1.2 Description of the vessel .......................................................................................................................10 1.3 History of the occurrence ......................................................................................................................12 1.3.1 Passenger evacuation .............................................................................................................16 1.3.2 Post-evacuation fire response ............................................................................................18 1.4 Environmental conditions .....................................................................................................................20 1.5 Personnel certification and experience ............................................................................................21 1.6 Vessel certification ...................................................................................................................................22 1.7 Authorized representative—scope of responsibilities ...............................................................22 1.7.1 Owner and authorized representative of the Holiday Island ..................................25 1.8 Northumberland Ferries Limited operations .................................................................................26 1.8.1 Typical trip ..................................................................................................................................27 1.8.2 Software for booking and reporting travel ....................................................................28 1.9 Passenger management ........................................................................................................................29 1.9.1 Passenger count .......................................................................................................................29 1.9.2 Passenger management training .......................................................................................30 1.10 Engine systems ..........................................................................................................................................30 1.10.1 Fuel system .................................................................................................................................32 1.10.2 Engine cooling system ...........................................................................................................38 1.11 Structural fire protection .......................................................................................................................39 1.11.1 Vents and air circulation ........................................................................................................40 1.12 Fire safety systems ...................................................................................................................................43 1.12.1 Fire alarms ...................................................................................................................................44 1.12.2 Firefighting equipment ..........................................................................................................44 1.12.3 Carbon dioxide fixed fire suppression systems ............................................................44 1.13 Engine room fires .....................................................................................................................................46 1.13.1 Fuel and heat .............................................................................................................................48 1.13.2 Effects of ventilation in a compartment fire ..................................................................48 1.14 Maintenance and repairs .......................................................................................................................49 1.15 Safety .............................................................................................................................................................50 1.15.1 Safety culture .............................................................................................................................51 1.15.2 Safety management systems ...............................................................................................51 1.15.3 Emergency procedures ..........................................................................................................52 1.15.4 Stability and flooding .............................................................................................................53 1.15.5 Emergency duties .....................................................................................................................54 1.15.6 Emergency drills .......................................................................................................................54 1.15.7 Skill-, rule-, and knowledge-based processing of information .............................56 1.15.8 Shared mental model .............................................................................................................56 1.16 Marine emergencies ................................................................................................................................58 1.16.1 Reporting of marine incidents ............................................................................................58 1.16.2 Response .....................................................................................................................................59 1.17 Life-saving equipment ............................................................................................................................62
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 5
- 18 Transport Canada oversight .................................................................................................................63
- 18.1 Delegated Statutory Inspection Program .......................................................................63
- 19 Organizational and management factors .......................................................................................64
- 19.1 Practical drift ..............................................................................................................................64
- 20 Cognition and human performance .................................................................................................64
- 20.1 Perception of risk .....................................................................................................................65
- 20.2 Diffused responsibility ............................................................................................................65
- 21 Related occurrences ................................................................................................................................65
- 22 TSB recommendations ...........................................................................................................................66
- 22.1 Carbon dioxide fixed fire suppression systems ............................................................66
- 22.2 Crew preparedness and realistic drills .............................................................................66
- 22.3 Passenger vessel evacuation procedures .......................................................................67
- 22.4 Passenger counting .................................................................................................................67
- 23 TSB Watchlist ..............................................................................................................................................68
- 24 TSB laboratory reports............................................................................................................................68
- 0
Analysis ................................................................................................................... 69 2.1 Engine room fire .......................................................................................................................................69 2.1.1 Fuel rail leak and repairs .......................................................................................................69 2.1.2 Use of the carbon dioxide fixed fire suppression system ........................................71 2.1.3 Engine room flooding ............................................................................................................73 2.2 Responsibilities of the authorized representative .......................................................................74 2.2.1 Safety management systems ...............................................................................................74 2.2.2 The authorized representative ............................................................................................79 2.3 Canada’s preparedness for marine emergencies.........................................................................81 3.0 Findings ................................................................................................................... 84 3.1 Findings as to causes and contributing factors ............................................................................84 3.2 Findings as to risk .....................................................................................................................................84 3.3 Other findings ............................................................................................................................................86 4.0 Safety action ........................................................................................................... 87 4.1 Safety action taken ..................................................................................................................................87 4.1.1 Transportation Safety Board of Canada ..........................................................................87 4.1.2 Transport Canada .....................................................................................................................87 4.1.3 Northumberland Ferries Limited ........................................................................................87 4.2 Recommendation .....................................................................................................................................89 4.2.1 Knowledge of the scope of the role and responsibilities of authorized representatives ..........................................................................................................................89 5.0 Appendices ............................................................................................................. 91 5.1 Appendix A – General layout of the Holiday Island ....................................................................91 5.2 Appendix B – TSB laboratory analysis of the fuel rail repair ...................................................92 5.3 Appendix C – Scope of responsibilities of the authorized representative .........................94 5.4 Appendix D – Emergency duties for fire and preparation for abandoning ship .............98 5.5 Appendix E – Related occurrences ................................................................................................. 100
TRANSPORTATION SAFETY BOARD OF CANADA ■ 6 5.5.1 Transportation Safety Board of Canada occurrences ............................................. 100 5.5.2 International occurrences .................................................................................................. 102
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 7
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ENGINE ROOM FIRE Roll-on/roll-off ferry Holiday Island Wood Islands, Prince Edward Island 22 July 2022 The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. This report is not created for use in the context of legal, disciplinary or other proceedings. See the Terms of use on page 2. Masculine pronouns and position titles may be used to signify all genders to comply with the Canadian Transportation Accident Investigation and Safety Board Act (S.C. 1989, c. 3). Executive summary The ferry Holiday Island operated on a 75-minute route that crosses the Northumberland Strait between Caribou, Nova Scotia, and Wood Islands, Prince Edward Island (PEI). On 22 July 2022, the vessel departed for Wood Islands on the 2nd voyage of the day. As the vessel approached Wood Islands, the fire alarm sounded in response to an engine room fire. The engines were shut down immediately and the fuel supply valves were closed shortly afterward. The master purposely beached the vessel on a sandbar to the west of the channel, outside the entrance to the Wood Islands terminal, and both anchors were dropped. The crew attempted to fight the fire locally but were unable to do so successfully. In part because of the smoke and heat, the air intake vents on the housetop deck were not closed. A remote release of the carbon dioxide (CO2) fixed fire suppression system was unsuccessful. When the crew noticed this, the system was activated with a manual release and was partially successful. The vessel’s fire team began boundary cooling. Preparations for evacuating passengers and non-essential crew members began while the fire teams were responding to the fire. Crew members assisted passengers down both marine evacuation system slides and into the life rafts. The crews of nearby vessels evacuated passengers and non-essential crew from the life rafts and took them to the reception point at the Wood Islands dock. Approximately 1.5 hours after the fire alarm first sounded, all passengers and crew members who were not part of the fire response had left the vessel. As shore-based firefighters boarded the vessel to assist, boundary cooling was expanded to the housetop deck and to the funnel deck and the firefighters began to monitor temperatures. At this time, a significant amount of smoke was coming out of the air intake and exhaust vents for the engine room.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 8 Close to high tide, at 1850, the stern of the Holiday Island floated free. The Holiday Island had been listing approximately 2° to 3° to port since the early afternoon. By 2017, the list had increased to approximately 5° and by 2044, it was listing approximately 10° to port. At 2148, out of concern for their safety, persons still on board (approximately 40) were evacuated. The fire continued to burn, and smoke from the engine room vents and stack continued to be visible until mid-afternoon on 23 July. On the morning of 24 July, the Holiday Island was towed to the Wood Islands terminal and the on-board vehicles were unloaded later that day. The vessel was later declared a constructive total loss. In the course of the occurrence, different numbers of passengers and crew were recorded. The master initially reported a passenger count of 182 and a crew count of 23 (a total of 205). In total, 236 passengers were counted at the reception point. The investigation found that a series of temporary repairs to a leaking fuel rail had been made over a period of approximately 1 month before the occurrence using non-standard materials and methods, while the vessel remained in service. When the final temporary repair to the leaking fuel rail failed, fuel sprayed onto the hot engine components and ignited. The investigation also found the following: • At the beginning of the firefighting response, water from a fire hose likely spread the burning engine fuel around the engine room and contributed to the spread of the fire. • An unlubricated component of the fuel valve assembly prevented the fuel valve from closing fully, allowing the contents of the day tank to drain through the damaged fuel rail and fuel the fire in the engine room. • The crew believed they had activated the CO2 fire suppression system, because the resistance felt when the CO2 release mechanism cable was pulled provided a false indication of success. • The guidance posted was not explicit. Consequently, the CO2 release was delayed, allowing the fire to grow. When the CO2 was released, the engine room space was not completely sealed. Air continued to enter the space through open vents, likely displacing the released CO2 and also adding oxygen to the fire. Consequently, the fire continued to burn. • The flexible connection between the cooling system and the forward main engine was not protected against heat and fire. When the flexible connection was damaged by the fire, seawater from the vessel’s cooling system entered and began flooding the closed engine room. The investigation identified safety deficiencies related to policies and procedures for emergency responses and communication on the part of the crew, the vessel operator, and first responders. Specifically, the investigation also identified safety deficiencies related to accounting for passengers in case of an emergency. Lastly, the investigation identified safety
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 9
deficiencies related to oversight by the authorized representative (AR) or their delegate, leading the Board to issue a recommendation. Knowledge of the scope of the role and responsibilities of authorized representatives Under the Canada Shipping Act, 2001, an AR, typically the vessel’s owner, is the person who is responsible for acting with respect to all matters relating to the vessel that are not otherwise assigned to another person. The AR must keep up with changes in safety knowledge, standards, and regulations. Where matters are assigned by regulation to another role, such as the master, the AR remains responsible for oversight of those matters. In addition to ensuring regulatory compliance, the AR or the AR’s delegate plays a proactive role in ensuring safety. Given the scope of the AR’s responsibilities, the relationship between the master and AR is critical and collaboration is essential for the continued safe operation of a vessel. For example, this collaboration requires ongoing assessment by both the master and the AR to ensure that procedures are understood, followed, and accurately represent all operations and that they also comply with regulations. As this investigation and many others demonstrate, the role of the AR is not always clearly understood. Transport Canada expects the AR to understand the scope of the role – that is, to take proactive measures to learn which regulations apply to their vessel and how to follow them. As such, the Board recommends that the Department of Transport provide comprehensive guidance for authorized representatives, outlining the full scope of their responsibilities. This guidance should support authorized representatives in understanding and complying with applicable regulations, thereby reducing the risk of vessels and crews operating without the minimum safety defences afforded by regulatory compliance.
TSB Recommendation M25-01
TRANSPORTATION SAFETY BOARD OF CANADA ■ 10 1.0 FACTUAL INFORMATION 1.1 Particulars of the vessel Table 1. Particulars of the vessel Name Holiday Island International Maritime Organization number 7041431 Official number 344866 Port of registry Charlottetown, PEI Flag Canada Type Roll-on/roll-off passenger ferry Gross tonnage 3037 Registered length 98.60 m Breadth 20.48 m Depth 5.79 m Built 1971, Port Weller Dry Docks Ltd., St. Catharines, Ontario, Canada Propulsion 2 diesel engines, each with a Voith Schneider propulsion system, for a total of 5408 kW Maximum complement 399 (381 passengers) Owner and authorized representative Minister of Transport, Canada Operator Northumberland Ferries Limited Recognized organization and issuing authority for International Safety Management certification Lloyd’s Register 1.2 Description of the vessel The Holiday Island was a double-ended roll-on/roll-off ferry of steel construction (Figure 1) built in 1971. The vessel had 6 decks: the main deck (also called the truck deck), the mezzanine deck, the upper deck (also called the car deck), the boat deck, the housetop deck, and the funnel deck (Appendix A).
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 11
The 2 enclosed bridges,1 crew accommodations, and offices were located on the boat deck. Each bridge was equipped with • navigational equipment, including radars, an echo sounder, and an electronic chart system; • a simplified voyage data recorder; • propulsion controls at the centre helm position and at both bridge wings; • control panels for the ballast system and for the fire detection and alarm system; • remote controls for the fire doors on the main and upper decks and remote controls for the watertight doors below the main deck; and • remote carbon dioxide (CO2) release stations. Communication equipment included 2 very high frequency (VHF) radios, 1 VHF–DSC (digital selective calling) radio, 2 sound-powered phones, and a public address (PA) system. Three portable VHF radios were also available on board.
1 The convention on the Holiday Island was to refer to the bridge facing Caribou, Nova Scotia, as the forward bridge and the bridge facing Wood Islands, Prince Edward Island, as the aft bridge, irrespective of the direction of travel. Similarly, port and starboard are always the same sides. This report follows the same convention. Figure 1. The Holiday Island ferry, before marine evacuation systems were installed (Source: M. Cathrae)
TRANSPORTATION SAFETY BOARD OF CANADA ■ 12 The pre-embarkation areas for the 2 muster stations were on the boat deck outside each bridge. The life rafts, marine evacuation systems (MESs),2 and emergency generator were also located on the boat deck. The emergency generator fuel tank, the fan room, and the furnace rooms were located on the housetop deck. The fuel tank for the accommodations furnace was located on the funnel deck immediately above the fan and furnace rooms. The main engine room, the engine control room (ECR), the auxiliary engine room, a workshop, and a crew dayroom, as well as fuel tanks, water tanks, and other compartments were located below the main deck. The 4 double-bottomed fuel tanks and the 2 sea chests for the engine cooling systems were located below the main engine room. 1.3 History of the occurrence On 22 July 20223 at 0839, the Holiday Island departed Wood Islands, Prince Edward Island (PEI), on the 1st voyage of the day, with 22 crew members4 on board. The vessel operated on a 75-minute route that crosses the Northumberland Strait between Caribou, Nova Scotia, and Wood Islands, running 3 to 8 times per day, depending on the season. At 0945, the Holiday Island arrived at Caribou and the passengers disembarked. Once disembarkation was complete, the passengers waiting to make the trip to Wood Islands began to board. Two motor homes, 1 5th wheel trailer, 2 tent trailers, 5 tractor-trailers, 1 cube truck, and 78 passenger vehicles were loaded. At 1004, the Holiday Island departed for Wood Islands. At 1005, the Caribou toll booth operator reported a passenger count of 182 to the bridge team on the vessel. At 1106, as the vessel approached Wood Islands (Figure 2), the fire alarm sounded on the bridge and the fire detection panel indicated that there was a fire in the main engine room. At this time, the bridge team consisted of the master, the second officer, and the quartermaster. At 1107, the fire alarm sounded throughout the vessel.
2 A marine evacuation system is ”life saving equipment that consists of one or more inflatable life rafts, a slide or chute as a means of embarkation into the inflatable life rafts and, in the case of a system with more than one life raft, an inflatable rescue platform.” (Source: Transport Canada, C.R.C., c. 1436, Life Saving Equipment Regulations (as amended 19 June 2024), subsection 2(1)) 3 All times are in Atlantic Daylight Time (Coordinated Universal Time minus 3 hours). 4 A 23rd crew member (electrician) had finished his rotation on the previous day.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 13
Figure 2. Map of the occurrence showing the vessel track and the beaching location, with an inset image showing the different locations of the vessel after the fire started: where the master beached the vessel (A); where the vessel floated free some hours later at high tide (B); where the vessel was towed, in deeper water (C); and where the vessel was abandoned (D) (Source of images: Google Earth, with TSB annotations) The master used an intercom system to speak with the second engineer, who was in the ECR and who confirmed that there was a fire, informed the master that the engines had to be shut down, and then began to shut them down. The master then used the PA system to instruct all crew to prepare for an engine room fire. Deckhand 4 began to close vents and dampers. At the same time, the assistant engineer and the fourth engineer attempted to enter the main engine room from the main deck stairwell (Figure 3) but determined that the main engine room was too hot to enter. The assistant engineer went to don his firefighting suit. Shortly afterward, the chief engineer went down to the main engine room. He also attempted to enter the engine room using the same door on the main deck but saw flames at the bottom of the stairs and closed the door. He then entered the ECR using the emergency escape hatch.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 14 Figure 3. Profile view of the centre of the Holiday Island from the starboard side, showing the main engine room, engine control room, and engine room ventilation (Source: Port Weller Dry Docks Ltd., with TSB modifications) At approximately 1108, the chief officer met the bosun on the truck deck and they began to prepare the fire hoses for firefighting and boundary cooling. While they were preparing the hoses, the master contacted the chief officer on a portable radio and requested that he prepare to drop both anchors. The quartermaster, deckhand 3, deckhand 4, the chief officer, and the bosun went to the forward mezzanine deck to prepare to drop anchor. At 1109, the master phoned the terminal manager at Wood Islands to report the engine room fire. The terminal manager then called emergency services (911) to report the fire and request assistance.5 From 1109 onward, the assistant engineer, deckhand 1, and the fourth engineer used a fire hose to spray water on the forward main engine from their position at the main deck entrance to the engine room.
5 The Wood Islands terminal manager and assistant manager updated the emergency services operator at 1116 and at 1125. At 1130, the terminal manager also contacted PEI Emergency Measures Organization and the Canadian Red Cross.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 15
At 1110, the master used the PA system to instruct all passengers and crew to muster at the muster stations. This announcement was interrupted on the bridge by another fire alarm. The passenger services crew members began to direct passengers outside so they could distribute lifejackets. Some adult passengers were issued child-sized lifejackets and some children were issued adult-sized lifejackets; no infant-sized lifejackets were available. At 1112, the master beached the vessel on a sandbar to the west of the channel, outside the entrance to the Wood Islands terminal. At approximately 1115, both anchors were dropped and the 2 deckhands left the anchor team. Deckhand 3 was instructed to don a firefighting suit and join the bridge fire team. On his way to join the bridge fire team, he stopped to help distribute lifejackets to passengers who requested assistance. Deckhand 4 helped the engine room fire team don their gear and returned to closing vents and dampers. At 1116, the chief engineer and second engineer left the ECR through the escape hatch and closed it behind them. At approximately 1117, from the main deck, the second engineer used the remote controls to close the fuel shut-off valves to the main engine. When the chief engineer joined the fire team on the main deck, the fourth engineer went to close vents and dampers with deckhand 4. At 1118, the master instructed the quartermaster to close all engine room vents on the main deck6 in preparation for using the CO2 fixed fire suppression system. The master immediately radioed the chief officer and the engine room fire team to inform them that the engine room vents were closed. At 1121, a radio operator at the Sydney Marine Communications and Traffic Services (MCTS) transmitted a Mayday relay distress message for the Holiday Island. At the same time, the JRCC (Joint Rescue Coordination Center) Halifax tasked the Canadian Coast Guard Auxiliary (CCGA) vessel Mellissa Jayne, a local fishing vessel, to assist with the evacuation. At 1124, the second officer left the bridge to join the chief officer. Because the amount of smoke billowing out of the funnel area had intensified, they decided to deploy the port MES in preparation for an evacuation. At 1126, the fire team at the engine room door radioed the master to say that they were unable to fight the fire, that the entrances to the engine room were closed, and that everyone was out of the engine room. The fire team began boundary cooling under the supervision of the second engineer. At this point, they observed that paint had started to melt on the main deck above the engine room. At 1127, from the bridge, the master activated the remote release for the CO2 cylinders. Around the same time, the fourth engineer returned to inform the fire team on the main
6 The engine room vents were located on the funnel deck and the housetop deck.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 16 deck that he had been unable to close the exhaust vents on the funnel deck because of the smoke and heat. The assistant engineer, who was still in his firefighting suit, donned his breathing apparatus, crawled under the smoke to the vents, and closed them. Deckhand 4 went to close air intake vents 9 and 157 on the housetop deck, which had to be closed from inside the fan room. The damper handle for vent 9 was in the closed position. At vent 15, the fan room was too hot and smoky to enter, so deckhand 4 closed the door by kicking it closed from the outside. At 1142, the chief engineer observed that the amount of smoke coming out of the funnel area was increasing and temperatures were high. He went to the CO2 control room to check whether the CO2 had been released. When he confirmed that the pilot cylinders had not been discharged, he activated the main engine room CO2 cylinders manually using the pilot cylinders and went to the bridge to report to the master. 1.3.1 Passenger evacuation Preparations for evacuating passengers and non-essential crew members began while the fire teams were responding to the fire. At 1117, using the PA system, the master directed “all passengers and crew not involved in firefighting, [to] please muster to the muster stations.” The chief officer, the bosun, deckhand 2, and deckhand 3 joined the passenger evacuation teams. Ashore, an operator from the 911 dispatch centre in Charlottetown, PEI, notified the JRCC that a ferry was on fire at Wood Islands and that it was being evacuated. At 1118, the JRCC asked an MCTS operator in Sydney, Nova Scotia, to transmit a Mayday relay. The JRCC also began to task air resources from the Canadian Armed Forces. At 1119, the chief officer radioed to the bridge team that he was at the port MES, assisting with the passengers (Figure 4). Crew members who were familiar with the operation of the MESs gave instructions to the lined-up passengers who were within earshot.8 At the same time, the JRCC tasked the Pictou, Nova Scotia, and Charlottetown inshore rescue boats9 to assist with the evacuation.
7 Vents 9 and 15 were the main engine air intake vents. They remained open throughout the occurrence. 8 The megaphone was not working because the batteries were run down. 9 Inshore rescue boats are fast rescue craft staffed by students and Naval Reserve personnel to support search and rescue operations in the busy summer season.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 17
Figure 4. The Holiday Island at the entrance to the Wood Islands terminal, with the marine evacuation slides and life rafts deployed (Source: North River Fire Department, PEI) Between 1120 and approximately 1200, the terminal manager and the assistant manager prepared the Wood Islands terminal to receive the Holiday Island passengers and the shore- based first responders. The terminal manager assumed the role of on-site response commander of the shore response control centre, as described in the Northumberland Ferries Limited (NFL) procedures.10 By 1130, the port MES slide was deployed by the chief officer. One crew member went down first to assist passengers in the life raft. By 1135, the bosun, second officer, and chief officer were assisting passengers down the slide and into the life raft. At 1131, the alarm system began to sound on the bridge and throughout the vessel again and the bridge team was unable to silence it except by keeping the PA system active. At 1133, as described in the NFL procedures for an evacuation, the master transmitted a Mayday call over VHF radio to report on the status of the Holiday Island and to announce that the crew were preparing to evacuate passengers from the vessel. At 1136, the Mellissa Jayne arrived on scene and its crew began to evacuate passengers from the life raft. Many other nearby vessels arrived to help. Passengers boarded the vessels and were taken to the reception point at the Wood Islands dock. Shortly afterward, the second officer went to help with the starboard MES evacuation.
10 Northumberland Ferries Limited, Confederation / Holiday Island emergency response manual (March 2022), Section 2.3: Shore Response Control Centres.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 18 At 1138, the master provided Sydney MCTS with a passenger count of 182 and a crew count of 23; at 1140, this count (205 persons) was reported to the JRCC by MCTS. At approximately 1147, the second officer deployed the slide at the starboard MES. Deckhand 3 entered the starboard life raft to assist passengers.11 From the life raft, the passengers boarded the responding vessels and were taken to the reception point at the Wood Islands dock. In total, 236 passengers were counted at the reception point. At 1151, the master received reports that the bridge communications were being broadcast over the PA system because of the action taken to silence the fire alarm. Shortly afterward, a cloth was taped around the PA system handset so that conversations on the bridge were muffled. By 1223, all passengers had left the vessel and the crew had searched the decks to confirm that no passengers remained on the vessel. By approximately 1228, crew members who were not part of the fire response had left the vessel. 1.3.2 Post-evacuation fire response At 1231, the master was informed that shore-based firefighters from local fire departments had begun to arrive, bringing additional gear, such as air cylinders. A rope ladder was secured to the port main deck for the firefighters to use to board the vessel. At 1237, the master reviewed the vessel’s fire control plan with the firefighters. The vessel’s fire team began to take direction from the firefighters. At 1242, the master advised the JRCC that he had accepted the firefighters’ assistance. At some points, more than 30 firefighters from various fire departments were on the vessel. The deputy chief from the Belfast, PEI, fire department remained on the Wood Islands dock and tracked the firefighters as they came and went from the vessel. With the additional firefighters, boundary cooling was expanded to the housetop deck and to the funnel deck, where the fuel tank for the accommodations furnace was located. At this time, the assistant engineer and a firefighter observed a significant amount of smoke coming out of the air intake fan for the engine room (vent 15). They attempted to enter the space, but it was too smoky to see and too hot. The firefighters monitored temperatures using thermal cameras on board and with a drone (Figure 5). At the point when firefighters began boundary cooling on the funnel deck, the funnel temperature was approximately 113 ℃ and the temperature of the furnace fuel tank was approximately 90 ℃.
11 As the passengers came down the slide, crew members at the top and bottom of the slide used signals to control the evacuation.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 19
Figure 5. Thermal scan of the centre of the Holiday Island showing a cool area around vent 9, as well the furnace fuel tank being cooled by the boundary cooling spray. A hotter area can be seen at vent 15. Note that some areas, such as the deck surface, appear hot because of the heat from the sun. (Source: North River Fire Department [PEI] with TSB annotations; thermal image superimposed on image of vessel)
At 1255, an NFL employee called the master to advise that a tug12 had been arranged from Port Hawkesbury, Nova Scotia, so that the Holiday Island could be towed to the dock and fire trucks could be used. At 1318, the terminal manager, in his role as on-site commander, informed the JRCC that 13 crew members and 6 firefighters remained on board. At 1339, a Transport Canada (TC) marine safety inspector arrived on board and joined the firefighters in directing the fire response. Monitoring and boundary cooling continued. At approximately 1340, the CCG vessel Cape Spry arrived on scene. At 1614, 13 crew members and 23 firefighters were reported on board. Firefighters were rotating on and off the vessel, and monitoring and boundary cooling continued. The fire was still burning and the vessel was listing slightly to port.
12 The tug Svitzer Bedford arrived early on the morning of 23 July 2022.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 20 At 1734, the TC marine safety inspector suggested the crew consider releasing the auxiliary engine room CO2 cylinders. The crew and the firefighters traced the lines to determine how to release the auxiliary engine room cylinders into the main engine room and activated the pilot cylinders. After the pilot cylinders were activated, freezing was observed on the lines to the main engine room. Monitoring and boundary cooling continued. Near 1830, NFL staff delivered some food and water to those on board and indicated that they planned to find a relief crew for the crew on board so that the fire response could continue until the vessel could be towed to the dock. Close to high tide at 1850, the stern of the Holiday Island floated free. Between 1922 and 1945, the Holiday Island was towed approximately 270 m to a position further from the channel by the CCG lifeboat Cape Spry so that the passenger ferry Confederation could pass on its scheduled service. The Holiday Island remained in approximately 9 m of water; at the time, the vessel had a mean draft of 4.9 m. At 1948, the vessel was listing approximately 2° to 3° to port, as it had been since the early afternoon. At 2017, the TC marine safety inspector was replaced by another TC marine safety inspector. At this point, the Holiday Island was listing at approximately 5° to port. At approximately 2030, a partial crew change on the Holiday Island was made. By 2044, the vessel was listing approximately 10° to port. Crew began to sound the tanks and other spaces to determine if there was water ingress, and the firefighters and crew started planning how to pump water off the vessel. Using the thermal camera, firefighters observed that the temperature of a sounding pipe cap for 1 of the double-bottomed fuel tanks was 67 ℃. At 2107, the JRCC contacted the TC marine safety inspector who reported that the temperature of the fuel tanks was close to the flashpoint of the fuel (63 °C), and there was a risk of explosion. At 2116, when the JRCC could not reach the crew on the vessel, the JRCC advised the NFL vice-president of marine operations of the perceived risk. At 2120, the JRCC advised the first responders to prevent additional vessels and firefighters from approaching the Holiday Island. At approximately 2125, the approximately 40 persons still on board were instructed to evacuate the vessel. At 2148, the evacuation was complete and confirmed. Smoke from the engine room vents and stack continued to be visible until mid-afternoon on 23 July. On the morning of 24 July, the Holiday Island was towed to the Wood Islands terminal and the on-board vehicles were unloaded later that day. The vessel was later declared a constructive total loss. 1.4 Environmental conditions On 22 July 2022, the skies were partly cloudy. Winds were from the south-southeast at 5 to 10 knots and shifted to coming from the southwest later in the day. The wave heights were
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 21
below 0.5 m throughout the day. The water temperature was approximately 20 ℃.13 In Charlottetown, air temperatures reached 29 ℃, and the humidex value was 38 ℃ at its highest point. On the day of the occurrence, the crew had logged that some areas of the vessel were too dangerous to work in because of the heat and humidity. The first low tide of the day was at 1203 (0.8 m) and the next high tide was at 1850 (1.7 m).14 1.5 Personnel certification and experience The master held a Master Mariner certificate of competency. He had completed International Convention on Standards of Training, Certification and Watchkeeping for Seafarers (STCW) Advanced Firefighting (AFF) training, most recently in January 2022. The master started his seagoing career as a fish harvester in the 1980s. In 1992, he began working as watchkeeper or chief officer on other types of commercial vessels. He began working for NFL in 2013 and had been master since 2016. The chief officer held a Chief Mate, Near Coastal certificate of competency. He had completed STCW AFF training in April 2022. The chief officer had been working for NFL since 2012 and had been chief officer or second officer since 2014. The second officer held a Master Mariner certificate of competency. He had completed STCW AFF training in June 2021. The second officer had been working with NFL as second officer or chief officer since 2019. The chief engineer held a Second-Class Engineer, Motor Ship certificate of competency. He had completed STCW AFF training in 2017. The chief engineer had been working for NFL and Bay Ferries (an NFL subsidiary) since 2005 and had approximately 7 years of experience as chief engineer. The second engineer held a Third-Class Engineer, Motor Ship certificate of competency. He had completed Marine Emergency Duties (MED) training modules C and D in 1991. The second engineer had been working as a watchkeeping engineer since 1971. He started to work on the Holiday Island in 1972 when it was owned by CN Marine. He had been working for NFL since 2001. The fourth engineer held a Fourth-Class Engineer, Motor Ship certificate of competency. He had completed STCW AFF training, most recently in 2021. The fourth engineer had been working for NFL since 2013 and had been a watchkeeping engineer since 2015.
13 Sea Temperature Info, “Water temperature in Northumberland Strait (PEI) in July,” at https://seatemperature.info/july/northumberland-strait-water-temperature.html (last accessed on 15 July 2024). 14 Fisheries and Oceans Canada, ”Wood Islands – 01680,” at https://tides.gc.ca/en/stations/01680/2022-07- 22 (last accessed on 15 July 2024).
TRANSPORTATION SAFETY BOARD OF CANADA ■ 22 The assistant engineer held a Watchkeeping Engineer, Motor-driven Fishing Vessel certificate of competency issued in August 1985 and an Engine Room Rating certificate issued in April 2018. He had completed MED Basic Safety training in January 1985. The assistant engineer had been working for NFL since 2016. The passenger services supervisor had first taken passenger safety management training in
- Her most recent certificate expired on 11 June 2022. She had completed MED Basic
Safety training in 2008. The passenger services supervisor had been working for NFL since 2008. 1.6 Vessel certification The Holiday Island held an inspection certificate for Near Coastal, Class 2 voyages, limited to ferry service voyages in the Northumberland Strait between the ports of Caribou and Wood Islands. The certificate was valid until 10 May 2023. The Holiday Island had been issued 3 safe manning documents by TC. The safe manning level depended on the number of passengers on board (Table 2). Table 2. Safe manning levels for different numbers of passengers Number of passengers Number of crew 0 11 1–184 16 185–381 18 The Holiday Island was classed with Lloyd’s Register and inspected by Lloyd’s Register acting as the recognized organization (RO)15 under the Delegated Statutory Inspection Program (DSIP). The vessel operated under a safety management system (SMS). The SMS was certified and audited by Lloyd’s Register under the International Safety Management (ISM) Code.16 1.7 Authorized representative The Canada Shipping Act, 2001 (CSA 2001), which came into force in 2007, is the legislation that governs marine transportation in Canada. One of the objectives of CSA 2001 is the promotion of safety in marine transportation. The role of a vessel’s authorized representative (AR) is described in section 14 of the CSA 2001 and in regulations made under the act. The CSA 2001 was a significant revision of the Canada Shipping Act (R.S.C. 1985), the previous legislation governing marine transportation. As part of this legislative update, the role of the AR expanded significantly, with added responsibilities such as
15 ROs are classification societies. Classification societies also certify international SMSs. 16 When the Holiday Island and NFL were first enrolled in the DSIP, an SMS was a pre-requisite for passenger vessels to participate. At the time of the occurrence, an SMS was not required by regulation. SMSs are now mandatory for all such vessels (Transport Canada, SOR/2024-133, Marine Safety Management System Regulations).
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 23
developing procedures for safe operation and ensuring that vessels comply with regulations. Before 2007, the AR was primarily an administrative contact. An AR is the person17 who is responsible for acting with respect to all matters relating to the vessel that are not otherwise assigned to another person. Even where matters are assigned to another person, the AR remains responsible for oversight of those matters. For Canadian vessels, the role of the AR is tied to ownership.18 The AR must be the owner of the vessel (or 1 among joint owners) or the bare-boat charterer. Since June 2023, the owner of a vessel may delegate a qualified person to act as the AR for that vessel. A qualified person must be a Canadian citizen or permanent resident, or a corporation incorporated under Canadian or provincial laws.19 1.7.1 Scope of responsibilities The scope of AR responsibility covers many areas (see Appendix C for a detailed list). For example, ARs are required to provide vessel masters with written procedures. The procedures must cover familiarization with shipboard equipment, operational instructions, and assigned duties. ARs are also required to ensure that the vessel and its machinery and equipment meet regulatory requirements20 and are seaworthy.21 The AR also shares responsibility with the master for ensuring that the vessel and the people on board are protected from hazards.22 In TC communications such as technical publications (TPs) and ship safety bulletins (SSBs), which relate to individual regulations or topics of interest to the marine community, TC explains the responsibilities of the AR, master, or other person responsible.
17 Under Canadian law, a corporation is a separate legal person for the purposes of liability; thus, authorized representatives can be corporations. 18 For foreign vessels operating in Canada, the authorized representative is the vessel’s master. 19 Government of Canada, Canada Shipping Act, 2001 (S.C. 2001, c. 26, as amended 23 June 2023), section 14. 20 Ibid., subsection 106(1). 21 Ibid., section 85. 22 Ibid., section 109.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 24 ARs and similar roles (safety designate, authorized person, qualified person23) are constructs that are used in other domains, both in Canada and internationally.24 There are differences in the details of these roles and between the marine industry and other domains. To assist ARs or their equivalents in understanding the scope of their responsibilities, some government departments and safety associations have developed training programs, manuals, information bulletins, and online resources.25,26 For example, in Newfoundland and Labrador, WorkplaceNL (the province’s workplace injury insurance provider) requires that a workplace with fewer than 6 employees have a workplace health- and-safety designate.27 The safety designate’s responsibilities are similar to that of a vessel’s AR in that they are responsible for the health, safety, and welfare of the people employed in their workplace. The Newfoundland and Labrador Fish Harvesting Safety Association28 has developed a WorkplaceNL-approved, free, 6-hour online course that safety designates must participate in. TC Marine Safety and Security (TCMSS) has voluntary programs that provide training and information for some vessel owners, although these programs do not name ARs explicitly: • Small Vessel Compliance Program29 (for vessels under 15 gross tonnage [GT], including tugs and fishing vessels) training to help owners understand the scope of their responsibilities;
23 The roles of qualified persons are generally defined in terms of their qualifications, that is, their knowledge and experience. For example, in the Canada Occupational Safety and Health regulations, a qualified person “means, in respect of a specified duty, a person who, because of his knowledge, training and experience, is qualified to perform that duty safely and properly.” See Employment and Social Development Canada, SOR/86-304, Canada Occupational Health and Safety Regulations (as amended 15 December 2023), section 1.2: Interpretation. 24 For examples, see A. Jury and M. Pinsi, BSI/UK/1933/ST/0221/EN/AS, Person responsible for regulatory compliance (PRRC) – MDR/IVDR Article 15: An overview of the requirements and practical considerations (BSI National Standards Body), at https://www.bsigroup.com/globalassets/meddev/localfiles/fr- fr/whitepapers/wp---person-responsible.pdf (last accessed on 8 May 2025) and Netherlands Enterprise Agency, RVO, Product Safety and the Role of the Authorized Representative, at https://business.gov.nl/regulation/product-safety-and-role-of-authorised-representative/ (last accessed on 8 May 2025). 25 Canada Revenue Agency, “Responsibilities of authorized representatives,” at https://www.canada.ca/en/revenue-agency/services/e-services/represent-a-client/responsibilities- authorized-representatives.html (last accessed on 8 May 2025). 26 Transport Canada Civil Aviation, “Authorized Person Program and Bulletins,” at https://tc.canada.ca/en/aviation/training-pilots-aviation-personnel/authorized-person-program-bulletins (last accessed on 8 May 2025). 27 Government of Newfoundland and Labrador, Occupational Health and Safety Act (as amended in 2022), section 42.1: Workplace designate. 28 Newfoundland and Labrador Fish Harvesting Safety Association, “The Fishing Vessel Safety Designate Program,” at https://www.nlfhsa.com/fvsd (last accessed on 8 May 2025). 29 Transport Canada, “Small Vessel Compliance Program,” at https://tc.canada.ca/en/programs/small-vessel- compliance-program (last accessed on 8 May 2025).
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 25
• Best Practices in Rental Boat Safety,30 an online course for owners of rental boat operations; and • TPs, SSBs, and other communications related to specific regulations and safety issues. The investigation did not find any publicly available guidance or training from TC that describes the scope of AR responsibilities for other sizes and types of vessels. Recent TSB investigations31 have demonstrated that the scope of the responsibility that TC assigns to ARs is not well understood in the Canadian marine industry. Even for larger vessels, the role may be perceived as an administrative contact.32 The TC website mentions AR responsibilities in a few places, primarily by quoting legislation and regulations.33 1.7.2 Owner and authorized representative of the Holiday Island The Government of Canada’s Minister of Transport was identified as the registered owner and AR of the Holiday Island. At the time of the occurrence, TC owned 3 other ferries that operated on interprovincial ferry routes. The Minister of Transport is also identified as the AR for those vessels. The management of TC-owned ferries falls under the TC Programs Group. Reporting to the Assistant Deputy Minister of Programs, TC Programs Group staff are responsible for programs related to all modes of transportation as well as environmental management, innovation, and waterways.34 Staff involved in the ferry program include the Regional Director, Programs, Atlantic Region; the operations manager and staff; and the capital projects manager and staff. For the day-to-day operations of the Holiday Island, the Regional Director, Programs, Atlantic Region acted on behalf of the registered owner. Larger projects that require a budget beyond regular operating expenses are considered capital projects. TC Programs Group was responsible for identifying and funding capital projects and for working with NFL to implement these projects. For example, the 2022 installation of the MESs was a capital project.
30 Transport Canada, “Best Practices in Rental Boat Safety,” at https://rentalboatsafety.ca (last accessed on 8 May 2025). 31 TSB marine transportation safety investigations M22P0259, M20P0230, M20P0229, M18P0014, M16C0036, and M10F0003. 32 For example, see S. Chapelski, “Canadian Maritime Law: Increased Penalties and Responsibilities for Authorized Representatives of Vessels,” Norton Rose Fulbright (25 October 2023), at https://www.nortonrosefulbright.com/en/knowledge/publications/0dcf3bc6/canadian-maritime-law- increased-penalties-and-responsibilities (last accessed on 8 May 2025). 33 For example, refer to TC’s “Form 14—Appointment of Authorized Representative (form 84-0035),” which is required only if “the vessel is owned by more than 1 owner or by a foreign corporation,” under “Appointing a representative” at https://tc.canada.ca/en/marine-transportation/vessel-licensing-registration/apply- manage-vessel-registration/information-you-may-need-apply#toc-5 (last accessed on 8 May 2025). The authorized representative is also often mentioned in TC’s ship safety bulletins. 34 Transport Canada, “Programs Group,” at https://tc.canada.ca/en/corporate-services/transparency/briefing- documents-transport-canada/20191120/20191120/programs-group (last accessed on 8 May 2025).
TRANSPORTATION SAFETY BOARD OF CANADA ■ 26 The TC Programs Group staff who oversaw the TC ferry program were familiar with the government processes for capital projects, such as the acquisition of the MESs, and for routine funding, such as contribution agreements. Only 2 of the staff involved in the ferry program had marine experience and both reported to the capital projects manager. They focused on capital projects such as evaluating potential replacement vessels, though they would occasionally support the operations manager, if requested. Because ferry program staff considered that the day-to-day operation of the vessel, including maintenance procedures and other AR responsibilities, had been sub-delegated to NFL, they provided limited oversight or guidance on vessel operations. TC Programs Group operates separately from TC Safety and Security. TC Safety and Security is responsible for the development of regulations and national standards and the implementation of monitoring, testing, inspections, and subsidy programs in the aviation, marine, rail, and road sectors. Reporting to the Assistant Deputy Minister of Safety and Security, the TCMSS staff oversee the certification and oversight of all commercial vessels under the CSA 2001. 1.8 Northumberland Ferries Limited operations TC Programs Group had a charter party agreement with NFL to operate the Holiday Island on its behalf; operations were financially supported through a contribution agreement with NFL that was signed by TC’s Regional Director, Programs, Atlantic Region and NFL’s President and Chief Executive Officer.35 The agreements between NFL and TC stated that NFL “shall act as if it were the ‘authorized representative’ (as defined in the Canada Shipping Act, 2001) of such vessel.”36 In administrative documents, various people at both TC Programs Group and NFL signed as the AR at different times. Under the DSIP, an AR can authorize the vessel operator to act as the signing authority. When the Holiday Island was enrolled into the DSIP as a fully delegated vessel, TCMSS reminded TC Programs Group that TC Programs Group remained responsible for the duties of the AR, as defined in the CSA 2001. The agreements between TC and the operator are regularly reviewed and renewed for periods of 1 to 5 years. These agreements included requirements for NFL to • provide the operations manager at TC Programs Group with quarterly reports about crossings; • report any incident, accident, occurrence, or deficiency that required communications with organizations such as the RO or MCTS;
35 At the time of the occurrence, the vice-president of marine operations for NFL also acted as the designated person ashore and the customer safety officer, and acted in other roles for Bay Ferries and the vessels associated with their routes. 36 Canada–Northumberland Ferries Limited, Ferry Services Contribution Program, Agreement for Wood Islands, Prince Edward Island to Caribou, Nova Scotia Ferry Service, Section 3.6.3: Safety of vessels.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 27
• notify TC Programs Group when ferry crossings had to be cancelled for any reason; and • notify TC Programs Group when emergency repairs were needed. Emergency repairs were not defined in the agreements but were described internally as any incident that could affect the operation of the ship or a situation that could get worse if ignored. The investigation found 2 notifications from NFL to TC Programs Group in 2022 about a need for emergency repairs. One notification resulted in a repair that caused a delay in crossings. The other notification resulted in a repair that caused cancellations and was related to a system that was part of a capital project. TC Programs Group, on behalf of the owner, was required to commission an annual vessel inspection; NFL was required to respond to this inspection report. The last annual vessel inspection report for the Holiday Island was produced in 2017. Informal discussions about maintenance continued during site visits and other conversations related to the quarterly reports from NFL (see section 1.14, Maintenance and repairs). 1.8.1 Typical trip During the tourist season, PEI is a popular destination for travellers, and the demand for travel to the island is high. The Northumberland Strait separates the mainland from PEI; this body of water is significant for tourism and is also an important location for shellfish fisheries, especially lobster. To cross the Northumberland Strait, travellers can use the Confederation Bridge or take the ferry. To accommodate the volume of travellers, NFL37 operated 2 ferries, the Confederation and the Holiday Island, for a total of 8 trips in each direction daily.38 Ferries carry vehicles as well as walk-on passengers; some trucking companies use the ferry crossing to shorten the travel distance required for commercial deliveries.39 The number of vehicles that could be loaded on each vessel varied according to the tide. Throughout the year, the ferry crossing is often fully booked. Delayed or cancelled crossings could result in a long wait at the terminal or could require passengers to use the
37 Bay Ferries, a subsidiary of NFL, operates the ferry route between Saint John, New Brunswick, and Digby, Nova Scotia, and the route between Bar Harbor, Maine, and Yarmouth, Nova Scotia. NFL and Bay Ferries are separate organizations, but many of the administrative tasks are managed centrally and some of the shore staff have a role in both organizations. 38 When it is not the tourist season, NFL operates 1 ferry and makes 3 to 4 trips in each direction daily. 39 S. Bruce, “Plans in the works for extra P.E.I.–Nova Scotia sailings,” CBC News (published 17 June 2016, updated 17 June 2016), at https://www.cbc.ca/news/canada/prince-edward-island/pei-nova-scotia-ferry-mv- holiday-island-1.3640913 (last accessed on 12 May 2025).
TRANSPORTATION SAFETY BOARD OF CANADA ■ 28 Confederation Bridge instead. Delayed or cancelled crossings often result in high-profile news coverage.40 On a typical day, the Holiday Island departed on its 1st crossing from Wood Islands at 0830 and completed the 8th crossing back to Wood Islands around 2115. The Caribou–Wood Islands crossing took approximately 75 minutes. At each end of the trip, unloading and loading the Holiday Island took between 20 and 30 minutes. Passengers were asked to leave their vehicles during the crossing, and most passengers spent the trip on the boat deck or in the observation area on the housetop deck. At the beginning of each crossing, a safety briefing was broadcast over the PA system. Passengers could book online, by phone, or when they arrived at the terminal; most passengers booked online.41 Passengers travelling with a vehicle purchased 1 ticket for the vehicle and all passengers. Walk-on passengers purchased 1 ticket per person. Whether passengers booked online or at the terminal, they registered with the toll booth operator when they arrived. 1.8.2 Software for booking and reporting travel Passengers purchased tickets through an online booking form on the NFL website that was created using commercially available software. The website used only some components of the software.42 The form asked the user to select the crossing date and time, identify the number of passengers in each of 4 age groups (over 60, 13 to 59, 6 to 12, or 0 to 5 years old), choose whether the same passengers would be on the return trip (if a return trip was being booked), and add vehicle information. The name and accessibility requirements for each passenger could be entered as well as detailed contact information for the booking contact person. No controls verified that the information entered by passengers, such as the names and numbers of passengers, was accurate. As well, some passengers were unable to enter a different number of passengers on the outbound versus the return segments of round trips. One report generated by the software was the resource manifest report. This report summarized the bookings and listed the contact details, the number of passengers, and the type of vehicle. The resource manifest report also contained a column for the numbers of passengers and vehicles that boarded; NFL did not use the module that recorded passengers as they boarded the vessel and so this column was empty. The investigation determined that the information from these manifests was not used by the crew.
40 G. Harding, “P.E.I. premier wants 2nd ferry for Caribou–Wood Islands run,” CBC News (published 09 August 2016, updated 09 August 2016), at https://www.cbc.ca/news/canada/prince-edward-island/pei-caribou- wood-islands-ferry-1.3713333 (last accessed on 12 May 2025). 41 For example, in 2021, approximately 84% of passengers booked (and paid) online, 11% booked by phone, and 5% paid on arrival. Source: Narrative Research, 2021 Northumberland Ferries Limited Passenger Study (February 2022). 42 The ferry system software includes booking, check-in (terminal), account management, finance, sales, and reporting components, all based on a common database.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 29
On the day of the occurrence and in January 2023, TSB investigators requested passenger data for the occurrence voyage. For each request, investigators received a copy of the resource manifest report from the online booking system with different counts in each (230 passengers versus 166 passengers). 1.9 Passenger management In case of an emergency, crew and passengers need to be appropriately equipped and informed. As the management of passengers on a vessel during an incident brings additional complexity, the regulations stipulate higher standards for construction, equipment, and training on passenger vessels compared with similar commercial vessels. Regulations and guidance also set time limits for completing some emergency procedures. For example, passengers on a roll-on/roll-off vessel must be mustered and counted within 30 minutes of the general alarm sounding, and evacuation cannot take longer than 30 minutes.43 To prepare for emergencies, crew members need training as well as access to documented emergency procedures. These procedures must be reviewed and practised regularly to ensure the crew can respond effectively. Passengers need instructions on where to muster in the event of an emergency, where to access life-saving equipment, and how to use that life-saving equipment. Being prepared for how passengers may react in an emergency scenario and having experience in how to manage them is an important element of crew training on passenger vessels. The vessel’s AR is responsible for ensuring that both the crew and the passengers receive safety training.44 Typically, the master carries out drills for the crew, following the procedures supplied by the AR. The master is also responsible for maintaining records of training and familiarization.45 1.9.1 Passenger count The Fire and Boat Drills Regulations require that, before a passenger vessel sails, the master is to be provided with the number of persons on board and with details of persons who have declared a need for special care or assistance during an emergency.46 An accurate count of all persons on board (passengers and crew members) is important to ensure that
43 Transport Canada, C.R.C., C. 1436, Life Saving Equipment Regulations (as amended 20 December 2023), section 111. See also guidance provided in Transport Canada Ship Safety Bulletin 04/2022: Requirements for passenger evacuation and safety (08 February 2022), at https://tc.canada.ca/sites/default/files/2022-02/SSB- 04-2022E.pdf (last accessed on 12 May 2025). 44 Government of Canada, Canada Shipping Act, 2001 (S.C. 2001, c. 26) (as amended 22 June 2023), paragraph 106(1)(c). 45 Transport Canada, SOR/2007-115, Marine Personnel Regulations (as amended 23 June 2021), section 205. 46 Transport Canada, SOR/2010-83, Fire and Boat Drills Regulations (as amended 20 December 2023), section 10.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 30 everyone on board is accounted for in an emergency. An accurate count is also important for ensuring enough crew and equipment are available. The passengers were counted by the toll booth operators before they boarded the Holiday Island. Once boarding was complete, a toll booth operator reported the total number of passengers to the bridge. On the occurrence voyage, the toll booth operator reported 182 passengers. As well, the bridge recorded that 2 of the 182 passengers would require assistance in an emergency. The number of children and infants was not recorded. 1.9.2 Passenger management training The Holiday Island safe manning document for 185-381 passengers47 specified that Specialized Passenger Safety Management (Ro-Ro [roll-on/roll-off] Vessels) training was required for most of the crew,48 specifically, the master, chief mate, chief engineer, second engineer, and any crew members who interacted with passengers or who had duties involving cargo. Most of the crew members interacted with passengers, managed passengers at muster stations, or were involved in loading or discharging passengers. In this occurrence • the master, chief engineer, second engineer, and 2 other crew members had current Specialized Passenger Safety Management (Ro-Ro Vessels) training; • the chief mate and 9 other crew members had general passenger safety management training (which was expired for 5 of these 10 crew); and • the remaining 7 crew members interacted with passengers but had no passenger safety management training. 1.10 Engine systems The Holiday Island was equipped with two 12-cylinder Anglo Belgian Corporation marine diesel engines (Figure 6) fuelled by marine gas oil (MGO).49 Each engine was cooled by a seawater cooling system.
47 The safe manning document for 1-184 passengers specified that appropriate crew members are to hold relevant specialized passenger safety management and passenger safety management in accordance with sections 205 and 229 of the Marine Personnel Regulations. 48 Transport Canada, SOR/2007-115, Marine Personnel Regulations (as amended 23 June 2021), section 229. 49 Irving, Safety Data Sheet #27944: Marine Gas Oil (18 November 2022).
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 31
Figure 6. The aft engine before the occurrence, showing the location of the repairs (A) to the fuel rail (B), the turbo charger assembly (C), and the exhaust (D). The arrangement is identical to that of the forward engine, where the fire started (Source: Northumberland Ferries Limited, with TSB annotations) The engines were replaced in 2014. The vessel was in class and enrolled in the DSIP; the replacement followed both Lloyd’s Register class rules and TC regulations. Many hot surfaces and potential ignition sources exist in engine rooms and similar spaces (Table 3). To assist in preventing a fire, TC required a means to prevent escaping oil from coming into contact with hot surfaces.50 International Maritime Organization (IMO) guidelines further recommend that all vessels should protect surfaces that can reach temperatures above 220 ℃ and that may be exposed in the case of a fuel system failure.51
50 Transport Canada, SOR/90-264, Marine Machinery Regulations (as amended 23 June 2021), Schedule XII, Part 1 (Section 4), Item 21. Newer vessels may also be subject to the International Convention for the Safety of Life at Sea (SOLAS), 1974. 51 International Maritime Organization, MSC.1/Circ.1321, “Guidelines for Measures to Prevent Fires in Engine- Rooms and Cargo Pump-Rooms” (11 June 2009), at https://webaccounts.imo.org/Common/WebLogin.aspx?App=IMODOCS (last accessed on 10 June 2025). It is necessary to create a free account to view the circulars.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 32 Table 3. Engine temperatures (°C) for the forward engine of the Holiday Island (Source: Anglo Belgian Corporation, Diesel engine test report [2014]) Location Temperature Exhaust before turbine 590 °C at 75% load Exhaust at each cylinder 445 to 465 °C at 75% load Post-occurrence, the greatest fire damage was observed on the main engine between cylinders B5 and B6 (Figure 7). Figure 7. The cylinder head covers on cylinders B1 and B2 are intact. The covers on cylinders B3 and B4 are partially damaged and the covers on cylinders B5 and B6 are completely destroyed. The location of temporary repair to the fuel line is circled. (Source: TSB) 1.10.1 Fuel system Fuel was stored in double-bottomed tanks and transferred to the day tank52 inside the engine room. The fuel for each engine was gravity-fed from the day tank. The day tank held approximately 5 metric tonnes and was refilled multiple times daily. Post-occurrence, the TSB laboratory calculated that the flow rate of the MGO through a severed forward main engine rail could drain the volume of the day tank within 6 hours. The TSB laboratory concluded that unburned fuel from failures in fuel supply components likely collected in the bilge and supplied additional fuel to the fire. A fuel rail delivered fuel to the fuel injection pump and fuel injector for each engine cylinder. The fuel rail was a 25 mm diameter steel pipe,53 supported between the cylinders
52 The day tank supplied both the main engines and the 2 ship service generators. 53 The fuel rail was manufactured from DIN 2391 ST 35 steel.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 33
by pipe clamps secured to pipe brackets (Figure 8). The nominal working pressure of the fuel rail was approximately 2.0 to 2.5 bars. The fuel system was last inspected by the RO on 30 May 2021. This inspection included tightness of fittings, fire precaution arrangements (for example, jacketed pipes and their leak detection equipment), flexible hoses, and sounding arrangements. It also included emergency fuel shut-offs and vents. Figure 8. The fuel rail was supported by pipe clamps secured to pipe brackets. (Source: TSB, based on the Anglo-Belgian Corporation engine manual)
In June 2022, the crew observed a fuel oil leak between cylinders B5 and B6. The source was identified as a damaged location on the fuel rail on the port side of the forward main engine, and a series of temporary repairs was made (see section 1.10.1.2, below). The damaged location54 was within 80 cm of the turbo charger assembly (Figure 9). The TSB laboratory simulated the final temporary repair with the hose clamped onto the fuel rail and exposed it to temperatures and pressures similar to those in the occurrence. This simulation revealed that fuel could be sprayed from under the ends of the repaired, clamped hose, and that this fuel spray could reach distances greater than 137 cm (see Appendix B for details).
54 Post-occurrence examination found that the fuel rail was compliant with DIN 2391 ST 35 steel and that no thinning of the fuel rail wall had occurred near the fracture.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 34 Figure 9. Three-dimensional laser scan of the forward main engine showing the location of the damaged fuel rail (A), the estimated area of fuel spray (B), and the turbo charger assembly (C), the hottest surface on the engine (Source: TSB) Laboratory examination of other parts of the fuel system identified 4 fractures and 1 crack55 that were present before or during the occurrence fire. The examination also identified 1 crack for which it was not possible to determine the timing. 1.10.1.1 Fuel shut-off valves Fuel tanks are required to have shut-off valves that can be closed in an emergency. The day tank on the Holiday Island was equipped with 3 remotely operated fuel shut-off valves: 1 for both main engines, 1 for the generator, and 1 for the engine room heating furnaces. The controls for the remote valves were located forward of the CO2 room on the main deck (Figure 10). When the system was examined after the fire, the control indicators for the main engine and generator fuel shut-off valves were in the open position and the fuel valves were approximately half open. The heating furnace valve was closed and its control indicator was in the shut position.
55 A fracture is a fully failed part while a crack has yet to progress to a fracture.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 35
Figure 10. Spindles for the fuel shut-off valves in the compartment on the main deck. The spindle that closes the fuel valve for both main engines is circled in white. (Source: TSB) Each extended spindle arrangement had several linkages between the control and the day tank valve. All of these linkages required regular greasing. For the main engine spindle arrangement, the first 90° knuckle below the main deck (Figure 11) had 2 grease fittings; the grease fitting on the side closest to the main deck was not visible from where maintenance was performed and was difficult to access. During post-occurrence examination onboard the vessel, it was observed that the knuckle was seized and would not turn. A knuckle on the main engine spindle assembly was disassembled and examined by the TSB laboratory. The grease recess in the side of the knuckle closest to the main deck was dry and the valve side, closer to the fire, had retained grease.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 36 Figure 11. The opened knuckle in the main engine spindle assembly showing the 2 grease fittings (Source: TSB) 1.10.1.2 Maintenance and repairs of the fuel rail In June 2022, a series of temporary repairs to the fuel rail on the forward main engine began (Table 4). After 2 temporary repairs failed, a replacement fuel rail was ordered. Table 4. Temporary repairs to the fuel rail in the month preceding the occurrence Date (2022) Action 20 June A fuel oil leak that was identified on the forward main engine was leaking at a rate of 1 drop every few minutes. A 1st repair was made using fuel-rated gasket material and hose clamps. 28 June A 2nd repair was made using similar materials. 03 July A replacement fuel rail was ordered. An engine manufacturer’s representative offered a patch kit. 07 July An engine representative delivered a patch kit. 19 July Two more repairs were made (3rd and 4th) using fuel-rated gasket material and hose clamps. 20 July A 5th repair was made using similar materials and fuel rail clamps were removed. A contractor applied the repair patch provided by the engine representative; the repair failed immediately. The damage had grown to approximately 75–80% of the fuel rail’s circumference. A 6th repair was made using fuel-rated gasket material and hose clamps. 21 July After the 1st trip of the day, the fuel rail was cut fully to slide a section of heater hose over the damaged area. The heater hose was secured with hose clamps.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 37
Date (2022) Action NFL followed up with the engine representative about a delivery date for the replacement fuel rail. 22 July Fuel rail brackets were remounted (when the TSB investigated immediately after the occurrence, the fuel rail clamp between cylinders 5 and 6 was missing). NFL received an update stating that the replacement fuel rail was on back order and additional information would be available on 25 July. When the damage was first identified, a crew member suggested permanently repairing the fuel rail by removing and welding the damaged section of fuel rail, instead of patching it. External consultants also recommended the same repair. A weld would have required taking the vessel out of service for 1 or 2 days. On 20 July 2022, the external consultants were directed to apply the patch kit supplied by the engine representative. Fuel rails are installed very close to the engine block, and hard to repair in place. The fuel rail location and the size of the crack meant that not all instructions for applying the patch kit could be followed and this patch failed within minutes. On 21 July 2022, after the 1st voyage of the day, a temporary repair was made using a section of heater hose, which was made of a material the manufacturer describes as unsuitable for fuel or oil transfer,56 secured with 4 worm drive hose clamps (Figure 12). The next 3 voyages that day were delayed by 1 hour or less and the remaining voyages were on time. Post-occurrence, the TSB laboratory carried out a series of tests and determined that, with a combination of line pressure, exposure to fuel, engine room heat, engine vibration, and a marginally torqued clamp, a sudden leak could have developed.
56 Dayco, Products Guide (2021), “Coolant Hose,” p. 53.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 38 Figure 12. A reconstruction of the final temporary repair (Source: TSB) 1.10.2 Engine cooling system Each of the Holiday Island’s main engines and auxiliary generators was cooled by an open jacket water cooling system. The jacket water was cooled by seawater through a heat exchanger. Seawater was brought in through suction piping from below the waterline, passed through the heat exchanger, and discharged above the waterline. The seawater intake could only be closed using hand-operated valves located on the port and starboard sides of the hull in the middle of the engine room. The seawater cooling system consisted of rigid steel piping with a flexible connection at each intake and discharge point on the engine-driven seawater pumps. These flexible connections isolated the rigid piping and hull from normal engine vibration. According to both the Marine Machinery Regulations and the technical specifications of the engine replacement contract, when the new engines on the Holiday Island were installed in 2014, the installation was required to meet class rules. Under these rules, the flexible connections installed between the seawater cooling system and the engines, where failure
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 39
could result in flooding, were to be of a fire-resistant type.57 The type approval certificate for the flexible connections fitted on the Holiday Island had a similar requirement.58 In this occurrence, the flexible connection was not rated as fire resistant and was not protected by a fire-resistant sleeve. Investigators found no record that any deficiency related to the fire resistance of the flexible connection had been noted on the engine replacement plans, at the post-installation inspection, or in subsequent inspections. Finding: Other The need for fire protection of the flexible connections between the seawater cooling system and the engine was not identified at the engine replacement planning stage or during post-installation and subsequent inspections. When the vessel was towed to the dock on 24 July 2022, the engine room was found to be flooded to a level of 3.58 m from the tank top, above the tops of the main engines. The TSB’s post-occurrence examination of the vessel found that the flexible connection between the seawater cooling system and the forward engine was extensively damaged by the fire and was the main source of water ingress. As well, the main seawater intake valves were open.59 Depending on the type of vessel and voyage, TC regulations may require remote controls for the intake valves of the seawater cooling system. However, a passenger vessel such as the Holiday Island, operating on Near Coastal, Class 2 voyages, was not required to have remote valve controls60 and the Holiday Island was not equipped with them. 1.11 Structural fire protection Statutory requirements for the maintenance of a vessel define a minimum level of safety. Given the high degree of risk posed by fire, vessel construction regulations include requirements for structural fire protection as well as for fire suppression systems and other equipment for fighting a fire, such as portable foam applicators and firefighting suits. Provisions in new regulations may define exemptions (‘grandfathering’) in terms of the age of the vessel, the date it was registered in Canada, the age of the engine, and so on, but regulations typically require existing vessels to apply new elements that are considered feasible. Any installation of new equipment or machinery or substantial structural modifications must meet the regulations in force at the time.
57 Lloyd’s Register Group Limited, Rules and Regulations for the Classification of Ships (July 2022), section 7.3.4. 58 DNV GL, Type Approval Certificate, issued to Elaflex HIBY GmbH & Co. KG (20 February 2020), at https://elaflex.de/dokumente/download/Certificate/Zert_ERV_DNV_GL_ERV.pdf (last accessed on 16 July 2024). 59 The main seawater intake valves could not be closed until a few days after the vessel was towed to the dock. The flooding stopped once the valves were closed. The port generator had a flexible cooling hose that was also damaged by the fire. 60 Transport Canada, SOR/90-264, Marine Machinery Regulations (as amended 20 December 2023), schedule VIII, sections 23 and 24.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 40 Therefore, vessels of similar sizes operating in Canadian waters are required to meet quite different construction and equipment requirements, depending on their age.61 Because of the date it was built, the Holiday Island was required to comply with the Fire Detection and Extinguishing Equipment Regulations (now repealed) and the Hull Construction Regulations (as amended 02 February 2017). The Holiday Island engine room was a category A machinery space.62 In such spaces, all doors, hatches, vents, and other openings must be airtight when closed and bulkheads and decks must be “A” class divisions.63 1.11.1 Vents and air circulation Engine rooms and other machinery spaces are workspaces that require good ventilation during operations, which is provided by a ventilation system that consists of intake fans and exhaust fans. In case of a fire, such a space must be sealed by closing all vents and other openings to limit the availability of oxygen. The Holiday Island’s main engine room had 5 doors, 1 hatch, and 8 vents (2 air intake vents and 6 exhaust vents). Four of the 8 vents were on the housetop deck and 4 were on the funnel deck. The locations of these vents and all other vents were depicted on the fire control plan. Each vent was labelled with a number on the fire control plan and on placards that indicated the open and closed positions for the damper handle (Figure 13). The crew also used an informal document showing the location of the vents on each deck. Not all vents on this document were labelled. For example, only 1 of the 2 main engine intake vents was labelled as such.
61 For more detail, see the Regulatory Impact Analysis Statement for the Vessel Construction and Equipment Regulations published in the Government of Canada’s Canada Gazette, Part 1, Vol. 156, Number 44. 62 “Machinery spaces of category ‘A’ are spaces and trunks to such spaces [that] contain internal combustion machinery used for main propulsion, internal combustion machinery for purposes other than main propulsion where such machinery has in the aggregate a total power output of not less than 375 kW, or any oil fired boiler or oil fuel unit.” Source: Transport Canada, TP 11469, Guide to Structural Fire Protection (1993), Part 1: Definitions, at https://tc.canada.ca/en/marine-transportation/marine-safety/guide-structural-fire- protection-1993-tp-11469-e (last accessed on 16 July 2024). 63 “'A' class divisions are bulkheads and decks constructed of steel or other equivalent material, capable of preventing the passage of smoke and flame to the end of the one-hour standard fire test.” (Source: Ibid.).
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 41
Figure 13. Vent 15, with the damper handle in the open position and an access panel removed. The labels represent the location and appearance of the identification placards that were destroyed by the fire. (Source: TSB) The air intake vents for the main engine room, vents 9 and 15 on the housetop deck, closed with louvre dampers. The dampers were accessed from inside the fan room, which was
TRANSPORTATION SAFETY BOARD OF CANADA ■ 42 inside the same fire space as the engine room. The location of the dampers met the requirements in the regulations that were in force at the time of the occurrence.64 On newer vessels, damper handles must be capable of being closed from outside the space being ventilated, must operate both manually and automatically, and must pass the requirements for sealing defined in the fire test procedures.65 Vent 15 was installed in a conventional manner: when the vent was in the closed position, the handle was perpendicular to the direction of airflow. Vent 9 was non-standard, and the damper handle operated in the opposite direction. The fact that the operation of vent 9 was non-standard had been noted by the crew in May 2022, following maintenance of the vents, but the vent had not yet been adjusted. The engine room exhaust vents on the funnel deck also closed with louvre dampers. The vents met requirements at the time the vessel was constructed. Louvre dampers are not capable of completely sealing a vent; solid fire dampers seal more effectively. Planned maintenance on the intake louvre dampers included replacement with similar dampers, not solid dampers. Finding: Other The louvre dampers on the air intake vents were being replaced with the same type of damper, which is less effective at sealing vents than solid fire dampers. Post-occurrence, vents 9 and 15 were both found to be open. As the fire burned under vent 15, hot air flowed out from vent 15, which made it act as an exhaust, and fresh air came from vent 9, acting as an air intake (Figure 14; see also Figure 5).
64 Transport Canada, C.R.C., c. 1422, Fire Detection and Extinguishing Equipment Regulations (as amended 03 February 2017), subsection 8(2). These regulations were repealed in 2017. 65 Transport Canada, SOR/2017-14, Vessel Fire Safety Regulations (as amended 23 November 2022), subsection 112(1).
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 43
- 12
Fire safety systems Vessel construction regulations contain requirements for fire suppression systems and other equipment for fighting a fire, such as portable foam applicators and firefighting suits. Unlike structural systems, most requirements related to firefighting equipment apply to all registered vessels, regardless of age. Success in fighting a fire depends on the equipment available, the experience of those fighting the fire, and the area of the fire. The larger a fire is, the more likely it is that a manual firefighting response will be unsuccessful and a fixed fire suppression system will have to be used.66
66 United States National Fire Protection Association, NFPA 921: Guide for Fire and Explosion Investigations (2024). Figure 14. A diagram showing the hot air from the fire leaving the engine room through vent 15 (in red) and the fresh air drawing in through vent 9 (in blue) (Source: Port Weller Dry Docks Ltd., with TSB annotations)
TRANSPORTATION SAFETY BOARD OF CANADA ■ 44 1.12.1 Fire alarms The purpose of a fire alarm system is to detect the presence of fire or smoke and alert the occupants of the vessel, allowing them to evacuate to safety and facilitating a quick response to the fire emergency. Fire detection and alarm systems may have an event log to capture when the heat and smoke sensors and CO2 pilot cylinders are activated. The International Code for Fire Safety Systems67 specifies that a means to manually acknowledge all alarm and fault signals must be provided at the control panel. The code also specifies that it must be possible to manually silence the audible alarms on the control panel and indicating units. In this occurrence, the bridge crew activated the PA system as a workaround to silence the fire alarm. When they were notified that bridge conversations were being broadcast, they covered the microphone with a cloth. The investigation was unable to determine why the fire alarm could not be silenced. 1.12.2 Firefighting equipment Firefighting equipment is carried on vessels to fight fires and protect crew. Firefighting equipment includes fixed fire suppression systems and portable equipment to fight small fires. The required firefighting equipment on board the Holiday Island included firefighting suits and equipment for the bridge fire team and the engine room fire team. Water was supplied to the 38 fire hydrants through a network of pipes by multiple fire pumps, bilge pumps, and emergency pumps located below the main deck. As well, portable foam applicator firefighting equipment was stored on the forward main deck and the aft upper deck. The emergency generator and the pumps worked throughout the occurrence, and boundary cooling continued until the vessel was completely evacuated. The safety data sheet for the marine gas oil (MGO) used on the Holiday Island lists alcohol- resistant foam, water fog, dry chemical powder, and CO2 as suitable firefighting agents.68 The safety data sheet warns against using jets of water, because this spreads the fire.69 The same considerations apply to fuel that might be released from vehicles carried on the ferry. 1.12.3 Carbon dioxide fixed fire suppression systems CO2 is a colourless, odourless inert gas. It is non-flammable and non-conductive. CO2 is often used for fire suppression in category A machinery spaces such as engine rooms and in other confined spaces, such as cargo holds.
67 International Maritime Organization, International Code for Fire Safety Systems (IMO Publishing, 2016), Chapter 9: Fixed Fire Detection and Fire Alarm Systems, Section 2.5.1, Visual and Audible Fire Signals. 68 In the Guide for Land-Based Fire Departments that Respond to Marine Vessel Fires (NFPA 1405, section 12.10.8.5), the U.S. National Fire Protection Agency also states that the preferred agent for fighting a fire in the main engine room is foam. 69 Irving, Safety Data Sheet #27944 (18 November 2022), Marine Gas Oil (3095).
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 45
When applied to a fire, CO2 provides a heavy blanket of gas that displaces the oxygen to a point where combustion cannot occur. Proper sealing of the space where the CO2 will be released is essential to effectively extinguish the fire. CO2 is less efficient at cooling than water or other fire suppressants. After the decision to use a CO2 fixed fire suppression system is made, a number of preparatory steps must be carried out to ensure the crew is safe and the CO2 release is effective: • confirm all personnel are present and out of the space, • seal the space (ensure vents, fire dampers, and access points are closed), • close any oil and fuel valves, • confirm that all machinery inside the space is stopped, and then • activate the release of CO2. When the system is activated, a warning alarm sounds in the protected space. At the same time, a signal is sent to the fire alarm system that indicates that CO2 has been released and gives the location of the protected space. After a brief delay, the CO2 release begins and within a few minutes, cylinders are emptied. After use, the components must be recharged, replaced, or reset by qualified technicians. After CO2 has been released, the space must be cooled and ventilated before it is safe to re- enter. Ventilation of the space should not be started until it has been established both that the fire has been extinguished completely and that conditions are no longer sufficient for the fire to restart. Critically, the space must remain sealed until the temperature has cooled below the self-ignition point of any remaining fuel. If a space is re-entered too early, the fire may reignite and backdrafts may occur.70 Boundary cooling can be used to reduce the temperature of the space more quickly. The Holiday Island had CO2 fixed fire suppression systems for the main engine room and for the auxiliary engine room. The systems were supplied by thirty-three 53 kg cylinders that were stored in the CO2 room, which was located along the centreline of the main deck. The system was configured so that if CO2 were released for the main engine room first, the contents of all 33 cylinders would be released; if CO2 were released for the auxiliary engine room first, the contents of 11 cylinders would be released. The remote CO2 releases on the bridges were connected by a common cable that raised a pulley and then activated the control head of the pilot cylinders in the CO2 control room. The CO2 could also be released manually directly from the control head of the pilot cylinders in the CO2 control room. Successful activation of the pilot cylinders, whether via local or
70 Government of the United Kingdom, Marine Accident Investigation Branch, Safety Digest: Lessons from Marine Accident Reports No. 2/2017 (October 2017), at https://assets.publishing.service.gov.uk/media/5e81e5d2e90e0706fba5421d/2017-SD2- MAIBSafetyDigest.pdf (last accessed on 15 May 2025).
TRANSPORTATION SAFETY BOARD OF CANADA ■ 46 remote release, is recorded as a signal event. A record of this event is available through the control panel for the fire detection and alarm system on the bridge. In this occurrence, the CO2 release handle on the bridge did not provide feedback to the operator as to whether the operation of the handle had resulted in the release of CO2. The instructions for the crew, which were typical of CO2 fixed fire suppression system instructions, were “pull handle hard.” The investigation found that the release handle had been pulled to a distance of 7 cm when resistance was felt. At this distance, the slack in the cable between the bridges was taken up. Following the occurrence, the TSB examination of the release handle found it would need to be pulled to 24 cm to trigger the release of CO2. The TSB examination also found that 1 of the pilot cylinders in the CO2 control room was installed in a way that made it impossible to fully deploy the system using the manual trigger.71 1.13 Engine room fires Any fire on a vessel is serious because onboard fire fighting resources are limited; it takes time for outside help to arrive, and the options for personnel to escape (such as abandoning the vessel) carry their own risks. Therefore, in general, the crew of a vessel must be prepared to fight the fire themselves. To continue burning, fire requires fuel (flammable material), an oxidizing agent (air), heat, and a chemical chain reaction (Figure 15). Engine rooms contain a large amount of flammable material such as engine fuel, hydraulic fluids, oils, hoses, cleaning equipment, power tools, furniture, and cardboard. In this occurrence, the contents of the day tank fuelled the fire initially. As the temperature rose, the engine room contents were also consumed.
71 On 05 May 2023, the TSB sent Marine Safety Information Letter 03/23 to the Director General of Transport Canada Marine Safety and Security.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 47
Figure 15. Diagram showing the 4 elements of a fire tetrahedron: fuel, heat, air, and a chemical chain reaction (Source: TSB) In 2022, fires and explosions accounted for 17% of all shipping accidents reported to the TSB.72 In the 10 years before this occurrence, 95 fires were reported on commercial vessels over 150 GT, 48 (25%) of which were on passenger vessels. A total of 16 of the 48 fires (33%) originated in the engine room.73 Worldwide, a majority of fires originate in the engine room74,75 and almost 70% of those involve leaking engine fuel.76A common source of engine fuel in these fires is fuel system leakage, often attributed to vibration and errors in
72 Transportation Safety Board of Canada, “Marine transportation occurrences in 2022,” at https://www.bst- tsb.gc.ca/eng/stats/marine/2022/ssem-ssmo-2022.html (last accessed on 15 May 2025). 73 In 2024, passenger vessels accounted for 12% (273 out of 2222) of the registered commercial vessels over 150 GT. 74 Gard AS, “Engine room fires are still a major concern” (13 February 2025), at https://www.gard.no/insights/engine-room-fires-are-still-a-major-concern/(last accessed on 11 June 2025). 75 The Nordic Association of Marine Insurers, “Cefor Fire trend analysis” (December 2021), at https://cefor.no/globalassets/documents/statistics/nomis/2021/cefor-fire-trend-analysis-per-december- 2021.pdf (last accessed on 15 May 2025). 76 Gard AS, “Engine room fires are still a major concern” (13 February 2025), at https://www.gard.no/insights/engine-room-fires-are-still-a-major-concern/(last accessed on 11 June 2025).
TRANSPORTATION SAFETY BOARD OF CANADA ■ 48 the reassembly of fuel system components and insulation.77 As well, a sharp increase in the number of engine room fires was observed globally in 2020 and 2021,78 with approximately half of these fires caused by the contact of flammable liquid with hot surfaces. 1.13.1 Fuel and heat Whether the fuel source is solid, liquid, or gaseous, only vapours burn; solids and liquids must be heated to temperatures where they emit vapours before ignition is possible. The temperature at which a material emits enough vapour to ignite in air with an ignition source is its flashpoint; the temperature at which a material ignites without an ignition source is the auto-ignition temperature. If the temperature of a surface is higher than the auto- ignition temperature of a material that comes into contact with the surface, vapour from the material may ignite (hot surface ignition).79 The flashpoint of the MGO used on the Holiday Island was 63 °C80 and the auto-ignition temperature was 257 °C.81 The United States National Institute for Occupational Safety and Health found that fuel with the same specifications as the fuel used on the Holiday Island under conditions typical of the Holiday Island engine room could ignite on hot surfaces at temperatures as low as 380 °C and would always ignite on surfaces at temperatures above 580 °C.82 When a fire is fuelled by hydrocarbons (for example, MGO) and oxygen is available, a fire can reach temperatures of up to 1100 °C within 30 minutes.83 1.13.2 Effects of ventilation in a compartment fire At the early stage of a fire in a large compartment such as an engine room, when the intensity of a fire84 is determined by the amount of fuel available, hot gases created by fire
77 A. Charchalis and S. Czyż, “Analysis of Fire Hazard and Safety Requirements of a [sic] Sea Vessel Engine Rooms,” Journal of KONES Powertrain and Transport, Vol. 18, No. 2 (2011), at https://kones.eu/ep/2011/vol18/no2/6.pdf (last accessed on 18 July 2024). 78 The Nordic Association of Marine Insurers, “Cefor Fire trend analysis” (December 2021), at https://cefor.no/globalassets/documents/statistics/nomis/2021/cefor-fire-trend-analysis-per-december- 2021.pdf (last accessed on 15 May 2025). 79 The geometry of the surface and the air flow close to the surface are also factors. See V. Babrauskas, “Ignition of Gases, Vapors, and Liquids by Hot Surfaces,” Fire Technology, Vol. 58 (June 2021), pp. 281–310, at https://doi.org/10.1007/s10694-021-01144-8 (last accessed on 20 May 2025). 80 Irving, Certificate of Analysis, Certificate No. 3234279 (11 July 2022). 81 Irving, Safety Data Sheet #27944 (18 November 2022), Marine Gas Oil (3095). 82 W. Tang, D. Bahrami, L. Yuan, et al., “Hot Surface Ignition of Liquid Fuels Under Ventilation,” Mining, Metallurgy & Exploration, Vol. 39, Issue 3 (04 May 2022), pp. 961–968, at https://doi.org/10.1007/s42461- 022-00609-w (last accessed on 20 May 2025). 83 T. Hakkarainen, J. Hietaniemi, S. Hostikka, et al., VTT Research Notes 2497, Survivability for ships in case of fire: Final report of SURSHIP-FIRE project (2009), p. 85, at https://cris.vtt.fi/en/publications/survivability-for- ships-in-case-of-fire-final-report-of-surship-f (last accessed on 20 May 2025). 84 The heat release rate of a fire is a measure of its intensity. U.S. National Fire Protection Association, NFPA 921: Guide for Fire and Explosion Investigations (2024).
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 49
rise by convection and circulate. Heat that radiates from this hot layer can cause the fire to spread. The intensity of a fire is also determined by the amount of oxygen available. Openings into and out of the compartment can act as both air supplies and exhausts. If the compartment is sealed, a fire may be extinguished when the available oxygen in the compartment is consumed. If more oxygen is supplied through ventilation or other air sources, other flammable materials may ignite and the entire compartment may become involved, increasing the risk that the fire will spread by radiation to other compartments. During the post-occurrence examination of the Holiday Island, 2 main-engine air intakes and 2 small unnumbered exhaust vents on the housetop deck were found in an open position. Although there was evidence of high heat in some adjacent spaces, the investigation found that the fire did not spread outside the main engine room space. 1.14 Maintenance and repairs Vessels require routine maintenance, and operators must plan for unexpected maintenance or emergency repairs. Routine maintenance includes scheduled maintenance according to regulatory requirements, manufacturer recommendations, and vessel procedures. Scheduled maintenance may be done while the vessel is operating, while the vessel is at dock but out of service (anything from replacing engine hoses to rebuilding pieces of equipment), or in dry dock (such as to measure hull thickness). Corrective repairs are unplanned repairs due to ship defects and usually do not affect the vessel’s ability to safely operate. These repairs are done when operations allow, and may require parts that are not readily available. That is, vessels may continue to operate while waiting for parts or for a scheduled repair time, or may operate with temporary repairs. See Appendix E for some examples. Emergency repairs85 are unplanned repairs that are required, usually immediately, for the safety of the vessel or its ability to operate. In many cases, emergency repairs take a vessel out of service for at least a short period. In its Guidelines for the Survey of Repairs, the IMO states that “[w]here emergency repairs are necessary, the repairs should be documented in the ship’s log and submitted thereafter to the Administration or to the classification society acting on its behalf [...].”86 In general, repairs of the hull, machinery, or equipment may affect statutory certificates and class certificates. These repairs should therefore be authorized by TCMSS or the RO.
85 International Maritime Organization, MSC/Circular 1070, Ship Design, Construction, Repair and Maintenance (12 June 2003). 86 International Maritime Organization, MSC/Circular 1070, Annex – Guidelines for the Survey of Repairs, Ship Design, Construction, Repair and Maintenance (12 June 2003).
TRANSPORTATION SAFETY BOARD OF CANADA ■ 50 As required by the charter agreement, NFL provided TC Programs Group with quarterly reports of upcoming and completed maintenance. In its quarterly reports to TC Programs Group, NFL divided proposed work into categories: statutory work, class-related or safety- critical work, justified urgent work, and discretionary work. Some notes mention safety but most notes are related to costs. NFL was required by the charter party agreement to notify TC Programs Group of any emergency repairs. The charter party agreement defines emergency repairs as repairs which have to be carried out in the course of the Operating Season as a result of a marine casualty or other unforeseen event causing damage to the Vessel(s) or loss of operational capability of the Vessel(s) and that are necessary to ensure the seaworthiness of the Vessel(s) or the Vessel(s)’s operational status;87 NFL was also required by the DSIP agreement and class rules88 to notify the RO when emergency repairs were needed. When an RO is notified of an emergency repair, a visit from an RO surveyor may be scheduled and the vessel may remain out of service until the repair and visit are completed. The investigation determined that the RO does not necessarily consider repairs to the main engine fuel system to be emergency repairs requiring such notification. The Confederation/Holiday Island Emergency Response manual89 and other NFL SMS documents do not define any circumstances that would require notification of TC Programs Group or the RO, nor did the manual have a procedure that would support decisions around voyage cancellation. 1.15 Safety Within the last decade, organizational resilience research has proposed that the practice of safety inside a complex organization should not be defined solely by examining why things go wrong, for example why an accident has taken place. It should also include an understanding of why things go right, for example how people inside the organization create safety dynamically through minor adjustments90 to written procedures in response to new and unusual conditions. In other words, the definition of safety is changing from a primarily reactive approach based on examination of incidents and accidents to a
87 Transport Canada, Charter Party Agreement between Her Majesty the Queen in Right of Canada and Northumberland Ferries Ltd. (September 2014). 88 Lloyd’s Register Group Limited, Rules and Regulations for the Classification of Ships (July 2022), section 3.4.3. 89 The Confederation differs from the Holiday Island in a number of ways, which makes instructions specific to both vessels difficult to produce. Specifically, the Confederation is a single-bridge ferry, newer (built in 1993), and with a larger capacity. The passenger capacity is 599 and the vehicle capacity is 210. 90 E. Hollnagel, R. L. Wears, and J. Braithwaite, From Safety-I to Safety-II: A White Paper (University of Southern Denmark, University of Florida, and Macquarie University, 2015), at https://www.england.nhs.uk/signuptosafety/wp-content/uploads/sites/16/2015/10/safety-1-safety-2-whte- papr.pdf (last accessed on 20 May 2025).
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 51
complementary proactive approach that examines and recognizes actions or processes that contribute to an organization’s safety. Vessels like the Holiday Island represent an example of a complex system, the operation of which requires crew to be flexible and adaptive91 in their actions while remaining within the bounds of written procedures. Demonstrating such flexibility in daily operations is also the way a crew achieves success and contributes to safety. This can be accomplished by proactively anticipating how events can emerge inside the system. 1.15.1 Safety culture An organization’s safety culture is generally defined by the values, attitudes, beliefs, and behaviours of the people working within it. Organizations that have a healthy safety culture prioritize safety at all levels, that is, safety considerations outrank other pressures. An effective shipboard safety culture is a collaborative on-board effort supported by the willing and active participation of the crew (e.g., reflected in day-to-day activities, communication, and awareness of safety).92,93 In this occurrence, safety decisions aboard the vessel were affected by interactions between the crew and the organization’s shore staff and by the influence of external stakeholders and their priorities. 1.15.2 Safety management systems An SMS is an internationally recognized framework for formal documented safety management processes. An SMS enables companies to systematically identify hazards, manage risks, and make company94 and vessel operations safer. One part of an SMS is to document these formal processes. According to the IMO, [t]he cornerstone of good safety management is commitment from the top. In matters of safety and pollution prevention it is the commitment, competence, attitudes and motivation of individuals at all levels that determines the end result.95 The NFL SMS was audited by Lloyd’s Register against the requirements of the ISM Code. The most recent audit was completed on 05 October 2017, with satisfactory results.
91 Ibid. 92 J. Fenstad, Ø. Dahl, and T. Kongsvik, “Shipboard safety: exploring organizational and regulatory factors,” Maritime Policy & Management, Vol. 43, Issue 5 (2016), pp. 552–568 at https://doi.org/10.1080/03088839.2016.1154993 (last accessed on 20 May 2025). 93 J. Reason, Managing the Risks of Organizational Accidents (Ashgate Publishing, 1997), p. 252. 94 Chapter IX of the International Maritime Organization’s International Convention for the Safety of Life at Sea (SOLAS), 1974 defines company as “the owner of the ship or any other organization or person such as the manager, or the bareboat charterer, who has assumed the responsibility for operation of the ship from the owner of the ship and who on assuming such responsibility has agreed to take over all the duties and responsibilities imposed by the International Safety Management Code.” 95 International Maritime Organization, The International Safety Management (ISM) Code (IMO Publishing, 2018).
TRANSPORTATION SAFETY BOARD OF CANADA ■ 52 The NFL SMS included a safety management manual and an emergency response manual. On the Holiday Island, printed copies of these 2 manuals were located in the ship’s office and the crew’s mess, in accordance with the SMS. 1.15.3 Emergency procedures Emergency procedures are intended to facilitate an efficient and effective response to an unexpected event. They contribute to safety when they are operationally specific and when they consider the various conditions in which emergencies unfold. They must also take into account the resources (such as the number of crew members or the type of equipment) needed to respond. Procedures should clearly state when certain steps need to be taken in a particular order. Emergency procedures should consolidate key information that crew need to act in a timely manner and provide guidance to assist crew in identifying when safe limits are approached. The emergency procedures might then outline a decision process to assist crew in determining next steps, such as abandonment. The Confederation and the Holiday Island used the same safety management and emergency response manuals. The emergency response manual contained generic emergency checklists that were used by both vessels. The checklists covered various emergency scenarios, including blackout, grounding, collision, flooding, fire, and abandon ship. The checklist for fire set out the primary and secondary responses to be taken by crew in bullet- point form. The primary responses to be taken were listed as follows: • Immediately extinguish or contain the fire, inform the Bridge, notify the Master. • Sound general emergency alarm and the ship’s horn, and announce position of the fire. • Verify that fire doors, watertight doors, ventilation, fire dampers and ports are closed. • Start emergency pumps. • Ensure Bridge Teams are at stations. • Fire parties muster and proceed to the fire area. • Inform passengers of the nature of the emergency; muster passengers to the appropriate safe haven(s); respond to any passengers requiring special assistance. • Take precautions against flooding. • If possible, maneuver ship to prevent spread of fire. • Transmit security or pan message, as appropriate. • Report the incident to the nearest Coast Guard VTS [vessel traffic services], if within an area covered by VTS, otherwise report to the Coast Guard Radio Station. The information to be reported is contained in the Transportation Safety Board of Canada – Report of Marine Occurrence/Hazardous Occurrence Report (contained in the NFL Forms Manual).
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 53
• Notify appropriate Terminal Supervisor providing details of the incident and requesting appropriate response agencies.96 The secondary responses to be taken were listed as follows: • Log all events throughout the incident, if situation permits. • Ensure that VHF channel 16 and 2182 KHz are guarded. • Provide periodic status reports to the Terminal Supervisor. • As soon as situation permits, complete all reports required in Section 9 of the Safety Management Manual.97 The checklist for fire was last modified in March 2018. 1.15.4 Stability and flooding Regulations define limits for vessel stability, such as a maximum angle of heel after flooding.98 Stability booklets provide guidance to the crew about how to operate the vessel within the stability limits and how to evaluate the vessel’s stability under varying conditions of service in both regular operating conditions and in emergencies. The 2 main conditions documented in stability booklets are intact stability and damage stability. An intact stability assessment measures the vessel’s ability to right itself during normal operations, such as loading and unloading. Damage stability assesses the effects of flooding on the vessel’s stability under various damage conditions. In the event of an emergency, the stability booklet is used to determine the risk of capsizing. TC requires passenger ferries such as the Holiday Island to have a stability assessment and to keep the intact stability and damage stability booklets available for use by the master and crew.99 These documents were kept in the master’s cabin. A copy of section 10.3 of the intact stability booklet, Carrying Capacity, was also posted on the bridge. In the Holiday Island damage stability booklet, no worst-case damage condition exceeded 4° of heel.100 In 3 of the worst-case conditions, the ability of the vessel to right itself began to
96 Northumberland Ferries Limited, Confederation/Holiday Island Emergency Response Manual (March 2022). 97 Ibid. 98 For example, for unsymmetrical flooding, the equilibrium angle of heel for 1 compartment flooding is not to exceed 7°. See Transport Canada, C.R.C. c. 1431, Hull Construction Regulations (as amended 30 December 2023), subsection 12(6) and schedule II, section 2. Note that these regulations were superseded by Transport Canada’s Vessel Construction and Equipment Regulations (SOR/2023-257) as of 04 December 2023. 99 Transport Canada, C.R.C., c. 1431, Hull Construction Regulations (as amended 20 December 2023), subsection 12(6). Note that these regulations were superseded by the Vessel Construction and Equipment Regulations as of 04 December 2023. 100 Allswater Naval Architects & Engineers, “M.V. Holiday Island Damage Stability Booklet for Northumberland Ferries Limited,” 09105-150-R-001, Rev 0 (24 March 2010). The vessel copies of both the intact stability and damage stability booklets were stored in the master’s cabin.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 54 weaken around 7° and was negative near 15°. With a flooding emergency and degrees of heel of this extent, a vessel can capsize very quickly.101 In this occurrence, the angle of heel exceeded the worst-case limits when the vessel floated free, going from 2° to 3° to 10° within an hour. The crew monitored the increasing angle of heel after the vessel floated free and began to sound compartments to establish the flooding boundaries, according to the flooding emergency checklist. When a hot sounding pipe was discovered, the sounding efforts ended and the focus shifted to the potential of an explosion occurring. The crew asked shore staff to evaluate the vessel’s stability when the heel angle began to worsen. Shore staff asked a third party to evaluate the stability of the vessel; the results were received a week after the fire occurred. 1.15.5 Emergency duties The Holiday Island’s SMS contained a muster list that set out duties for a fire and prepare to abandon ship emergency and an abandon ship emergency. The muster list was organized according to crew member position (role) and described the duties assigned to each crew member. Some crew members had duties in both types of emergencies (Appendix D). There were 3 portable radios on board at the time of the occurrence, held by the chief officer, the engine room fire team, and the passenger services supervisor. All 3 radios worked, but the passenger services supervisor’s radio stopped working early in the occurrence, possibly because of a run-down battery. During emergency drills, the VHF channel that was used to communicate depended on which port the vessel was in. VHF channel 4 was used at Wood Islands and VHF channel 3 was used at Caribou, matching the frequency used by the terminal staff. The VHF channel used on board was changed upon arrival at each terminal. In this occurrence, the vessel had not yet reached port at Wood Islands, and there was initially some confusion among the crew about which channel to use. 1.15.6 Emergency drills In an emergency, crew members may be required to make decisions in a high-stress environment. They may have limited time available to respond and little previous experience in emergency situations. When crew members have an opportunity to regularly practise responding to different emergency scenarios through drills, the likelihood of a successful emergency response is increased. The Fire and Boat Drills Regulations mandate that passenger vessels conduct drills to ensure that crew are prepared to respond in an emergency. Masters are required to “ensure that
101 Government of the United Kingdom, Maritime and Coastguard Agency, Marine Guidance Note MGN 344 (M), “Observations and Recommendations arising from a Series of Domestic Passenger Vessel Evacuation Exercises” (November 2007), at https://assets.publishing.service.gov.uk/media/5a80408de5274a2e8ab4f130/MGN_344.pdf (last accessed on 21 May 2025).
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 55
drills, in so far as is feasible, are carried out as if there were an actual emergency.”102 Drills that involve realistic scenarios support crew members in responding to actual emergencies by increasing their preparedness. Realistic scenarios might integrate unexpected factors or involve multiple emergencies that overlap. Unexpected factors could include darkness, noise, a missing team member, or inaccessible equipment. Involving these variables can help crew members explore contingencies that may be needed and identify where there may be gaps in the procedures that impact the response to the emergency. A debrief is critical for crews to evaluate the effectiveness of drills, identify areas for improvement, and discuss comments or concerns regarding roles, equipment, communications, and so on. Incorporating feedback from drills can help keep emergency procedures up to date. The Holiday Island crews carried out fire drills every 4 days (every crew rotation) to practise the emergency procedures documented in the SMS.103 The fire drills rotated equally through each of 8 different locations on the vessel, including the engine room. During each drill, the crew would muster, check the firefighting equipment, test the fire and watertight doors, and check the vents and dampers. All crew would then muster at the boat stations, don lifejackets, and review the evacuation procedures. A record of the drill and equipment tested was entered after each drill as required by the Fire and Boat Drills Regulations.104 Over the course of a year, each fire hose would also be tested for water pressure during the drills. The drills were typically completed within an average of 8.5 minutes during the approximately 20 to 30 minutes when the ferry was loading and unloading. The drills did not involve passengers. Drill records show that, following 2 fire drills in 2021, crew on 1 rotation had discussions about and attended a demonstration on the use of firefighting foam. 1.15.6.1 Evaluation of drills Drills are good opportunities to evaluate whether crew understand their duties as per the muster list, whether there are enough crew to conduct the drill effectively, and whether emergency equipment is available and functioning. A drill typically focuses on 1 emergency (fire, for example). When this drill is complete, it is followed by another, such as an abandon ship emergency drill, simulating a full abandonment. Crew members take the roles defined in the muster list. Annual inspections by TCMSS or the RO may require the observation of emergency equipment in operation. This observation of emergency equipment may be part of a drill, giving inspectors or surveyors the opportunity to also evaluate the drill’s
102 Transport Canada, SOR/2010-83, Fire and Boat Drills Regulations (last amended 23 June 2021), section 17. 103 Other drills (e.g., blackout, bomb threat) were conducted at different intervals based on the SMS requirements. Some of these were tabletop (discussion-based) exercises rather than actual drills. 104 Transport Canada, SOR/2010-83, Fire and Boat Drills Regulations (last amended 23 June 2021), section 37.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 56 effectiveness. Inspections do not otherwise require the observation of drills, although a marine safety inspector or a surveyor may request to observe drills at their discretion. For example, inspectors may request to observe drills to verify that the master has ensured that the crew is “competent and operationally ready to respond to the emergencies addressed by the drills.”105 However, TSB investigations106 have found that the scope of drills conducted during an inspection may be limited. 1.15.7 Skill-, rule-, and knowledge-based processing of information The degree of conscious control exercised by an individual over their activities can be assessed based on the individual’s manner of processing information. Broadly speaking, the interactions of skill-, rule-, and knowledge-based processing reflect how the individual is interacting in the operational environment and performing tasks at hand. Knowledge-based information processing is largely conscious, occurring as an individual experiences novel situations. As training progresses, rules will be learned that will produce methodical responses in familiar situations. Practising tasks that are performed less frequently or are less familiar enables an individual to develop, to some degree, the skills required to perform the actions. The goal of regular interaction with procedures and practices is to make performance more automatic, where the individual responds appropriately upon perceiving relevant cues. When a scenario requires the performance of less familiar tasks, individuals rely on memory prompts (e.g., a checklist or operational briefing) to help initiate the appropriate sequence of actions. Training helps the individual anticipate the workload and potential consequences of the tasks ahead. Recurrent training reinforces the knowledge and rules related to operational contexts and it can also be a means to identify any gaps between course material and actual work practices that may change over time. 1.15.8 Shared mental model A mental model describes a form of cognitive structure that allows humans to interact effectively with their environment by organizing knowledge into meaningful patterns.107 The term “shared mental model” refers to the extent to which individual team members’ mental models overlap; or the extent to which members share the same understanding of the task and the team. There is considerable evidence to support the idea that the greater [the] degree of shared knowledge, the better the team will perform.108
105 Ibid., section 22. 106 TSB marine transportation safety investigations M22C0231, M17C0179, M15A0009, M13M0287, M13L0067, M12C0058, and M06W0052. 107 R. Reynolds and E. Blickensderfer, “Crew Resource Management and Shared Mental Models: A Proposal,” Journal of Aviation/Aerospace Education & Research, Vol. 19, Issue 1 (2009), pp. 15–23, at https://commons.erau.edu/cgi/viewcontent.cgi?article=1380&context=jaaer (last accessed on 26 May 2025). 108 Ibid.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 57
Success can be measured by the accuracy with which information is shared and, in turn, perceived and understood among the personnel on the vessel and the management representatives on shore that, as a whole, comprise the NFL team. Various influences may increase the gap between the mental models of ship versus shore personnel, although “[...]ship and shore personnel have at least partially shared mental models, largely due to their background and training […].”109 A shared mental model is a positive factor when team members’ knowledge and experience overlap. Good-quality communication in the decision- making process is particularly important, considering that participation by shore staff is almost always remote. As such, the shore staff’s role is “narrowly embedded” in the team (i.e., they are provided with observational or derived knowledge only) which, according to human factors research, results in shore staff depending heavily on “others for acquiring a basis for their decision making and may have little control over the authenticity or accuracy of the information provided.”110 In this occurrence, the NFL team was made up of the people closest to the problem of a leaking fuel rail and those who were responsible for successful ferry operations. After detection of the leak, the NFL team determined that applying local, temporary repairs was a feasible approach: a successful temporary repair meant continued serviceability of the Holiday Island and the replacement of the fuel rail itself could be scheduled with third-party contractors for a later date. The plan met a common goal for decision-makers within the NFL team, given that the fuel leak was a critical problem that coincided with the busiest period of the sailing season. The willingness of the Holiday Island’s engine room staff to attempt a series of temporary repairs to the fuel rail while the vessel was alongside meant no further disruptions111 to the sailing schedule that season. Alternatively, contracting a replacement of the damaged fuel rail would have incurred prolonged disruptions to the serviceability of the vessel, and as a result, created challenges for the NFL team to accommodate the passengers who had pre- purchased trips. Once the final temporary repair had been applied, communication about the repair was limited to a brief emailed status report from the vessel that the leak had been stopped. The brevity of the communication between shore and vessel precluded analysis that could have created a shared comprehension or perception of the risk related to the temporary repair.
109 M. Imset and K.I. Øvergård, “Shared Mental Models of Challenging Maritime Situations: Comparisons of Ship and Shore Personnel in the Straits of Malacca and Singapore,” TransNav, the International Journal on Marine Navigation and Safety of Sea Transportation, Vol. 11, Issue 2 (2017), pp. 57–62, at https://doi.org/10.12716/1001.11.02.05 (last accessed on 26 May 2025). 110 M. J. Van der Hoven (2001) cited in S. Dekker, Second Victim: Error, Guilt, Trauma, and Resilience (Routledge, 2013), p. 32. 111 The Holiday Island had missed several days sailing earlier in the 2022 season due to other repairs.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 58 1.16 Marine emergencies Depending on the marine environment in which a vessel is operating, it may be subject to any number of hazards. These hazards may result in marine emergencies such as fire, collision, person overboard, grounding, swamping, or capsizing. The vessel owner or master is responsible for being prepared for and responding to emergencies. While crew members on commercial vessels are trained and equipped to handle many emergencies with the resources available on board, sometimes an emergency shifts to become an emergency where outside help is needed. 1.16.1 Reporting of marine incidents Because the Holiday Island was operating in the Eastern Canada VTS Zone (ECAREG), the master of the vessel was required by regulation to report an on-board fire as soon as practicable.112 At sea, when there is a potential or immediate need for help, it is best practice to notify search and rescue (SAR) authorities as soon as possible. Doing so gives responders early and direct notice that their assistance may be required. The TSB has reported on a number of recent occurrences in which a delay in reporting an incident affected the response.113 The IMO,114 the International Telecommunications Union,115 the International Chamber of Shipping,116 the CCG,117 and TC118 all recommend that such a report be made to a radio ship reporting station by radio without delay when a situation has the potential to constitute a danger to life. In coastal areas, it is best practice to make a broadcast on VHF channel 16 (an international distress, safety, and calling frequency), as this also alerts vessels in proximity to the developing situation. Outside of VTS zones, vessels must maintain a continuous listening watch on VHF channel 16. In a distress situation, they are obliged to respond.119
112 Transport Canada, SOR/89-99, Eastern Canada Vessel Traffic Services Zone Regulations, subsection 6(a). 113 TSB marine transportation safety investigations M22A0312, M20A0048, M20P0229, M17C0179, M15C0045, and M15A0009. 114 International Maritime Organization, MSC/Circ. 892, Alerting of Search and Rescue Authorities (16 December 1998) and COM/Circ. 108, GMDSS [Global Maritime Distress and Safety System] Operating Guidance for Masters of Ships in Distress Situations (superseded on 01 January 2024 by MSC.1/Circ. 1656). 115 International Telecommunication Union (ITU), World Radiocommunication Conference, Radio Regulations (ITU Publications, 2016), section 32. 116 International Chamber of Shipping, Bridge Procedures Guide, Sixth Edition (International Chamber of Shipping Publications, 2022), section 4.19.2. 117 Fisheries and Oceans Canada, Canadian Coast Guard, Radio Aids to Marine Navigation 2024 (Atlantic, St. Lawrence, Great Lakes, Lake Winnipeg, Arctic and Pacific), at https://www.ccg-gcc.gc.ca/publications/mcts- sctm/ramn-arnm/index-eng.html (last accessed on 26 May 2025). 118 Transport Canada, TP 9878, Safety and Distress Radiotelephone and Procedures. 119 Government of Canada, Canada Shipping Act, 2001 (S.C. 2001, c. 26), Part 5, subsection 131(1).
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 59
The NFL Emergency Response Manual and NFL Safety Management Manual set out general reporting requirements for emergencies. As well, most of the emergency checklists, including the checklist for fire, contained 3 steps for reporting emergencies: • Transmit security or pan message, as appropriate. • Report the incident to the nearest Coast Guard VTS, if within an area covered by VTS, otherwise report to the Coast Guard Radio Station. The information to be reported is contained in the Transportation Safety Board of Canada – Report of Marine Occurrence/Hazardous Occurrence Report (contained in the NFL Forms Manual). • Notify appropriate Terminal Supervisor providing details of the incident and requesting appropriate response agencies.120 The Abandon Ship checklist specified that a distress call, rather than a security or pan message, should be communicated: • Transmit distress call:
• Mayday message on 2182 KHZ and/or 156.8 MHZ (channel 16 VHF) by radio telephone giving ship’s name, position and conditions and danger.
• Depress the Distress Alarm button.
• Notify the appropriate Terminal Supervisor providing details of the incident and requesting appropriate response agencies.121 In this occurrence, the master notified the NFL terminal staff when the fire was detected and issued a distress call (Mayday) when the abandon ship procedure began. In Canada, the report should be made to the nearest MCTS centre.122 1.16.2 Response Responses to marine emergencies in Canadian waters that involve risk to human lives are coordinated by a JRCC or a Marine Rescue Sub-Centre (MRSC), which have the authority to assign SAR resources.123 Once a JRCC or MRSC is notified of an emergency, its staff will begin to coordinate SAR operations. The JRCC or MRSC then maintains its authority to coordinate SAR operations until all people on board are reported safe or until there is no chance that a missing person could survive. For this reason, JRCC coordinators must keep track of how many people are on a vessel in distress and provide advice and support if evacuating these people becomes necessary. If a risk to the environment or to the vessel remains, then a new phase of the response begins, typically after the SAR phase ends.
120 Northumberland Ferries Limited, Confederation/Holiday Island Emergency Response Manual (March 2022). 121 Ibid. 122 Fisheries and Oceans Canada, Canadian Coast Guard, Radio Aids to Marine Navigation 2024 (Atlantic, St. Lawrence, Great Lakes, Lake Winnipeg, Arctic and Pacific), at https://www.ccg-gcc.gc.ca/publications/mcts- sctm/ramn-arnm/index-eng.html (last accessed on 26 May 2025). 123 Government of Canada, Canada Shipping Act, 2001 (S.C. 2001, c. 26, as amended 23 June 2023), section 130.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 60 1.16.2.1 Shore-based first responders When a marine emergency occurs close to shore, shore-based first responders may become involved. Shore-based first responders may include paramedics, firefighters, and police. The degree of involvement by the first responders depends on the situation and, ideally, takes into account their training and experience. For example, in a recent occurrence involving an engine room fire on the bulk carrier Tecumseh,124 the shore-based fire department provided logistical support and boundary cooling from shore, but it did not board the vessel as the firefighters were not trained in marine firefighting. Shore-based first responders are accustomed to coordinating their responses through a formal incident command system (ICS). An ICS is a standardized management system for emergencies, disasters, and non-emergency events.125 The system is designed to allow its users to adopt an integrated organizational structure capable of dealing with the complexity and demands of the incident without being hindered by jurisdictional boundaries. In an ICS, 1 incident commander at a time coordinates the response. In this occurrence, the emergency response involved many agencies and individuals, including the CCG, the Canadian Armed Forces, NFL management, the PEI Emergency Measures Organization, Island Emergency Medical Services, the RCMP (Royal Canadian Mounted Police), TCMSS staff, approximately 200 firefighters from PEI fire departments, and the crews of various vessels of opportunity. Those who boarded the vessel while the response to the fire was ongoing included a rotation of firefighters, NFL staff, replacement NFL crew, and 2 TCMSS staff. On the shore, a paramedic tracked firefighters as they left the dock and returned. On the vessel, the investigation found no records of firefighters, crew, or other people being tracked as they left or boarded the vessel. After the occurrence, the PEI Emergency Measures Organization prepared a review. In its report, the organization identified some areas of strength with respect to communication and inter-agency cooperation, but it also recommended a more formal plan for information sharing and communication.126 1.16.2.2 Risk of environmental effects Marine emergencies and incidents must be reported even where they do not pose, or no longer pose, a danger to human life, such as incidents posing a risk to the vessel or a risk of
124 TSB Marine Transportation Safety Investigation Report M19C0403. 125 ICS Canada, “Incident Command System,” at https://icscanada.ca/# (last accessed on 26 May 2025). 126 B. MacIsaac, D. Murray, Northumberland Ferries Ltd. M/V Holiday Island Fire/Evacuation: After Action Review, Prince Edward Island Emergency Measures Organization (2022).
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 61
marine pollution. Plans exist to support emergency responses for some sectors, vessels, and emergencies. For example: • Port authorities in the 17 larger Canadian ports may have pre-arranged relationships with shore-based firefighters and may have arranged contingency plans for fires on board vessels.127 In these ports, the shore-based firefighters are professional firefighting departments, with more capacity for specialized training. • Some classes of vessel that also operate in U.S. waters are required to have contracts in place with salvage and marine firefighting providers so that emergencies can be handled in a timely manner. These resource providers, who have some knowledge of the vessel, may be called upon for emergencies in Canadian waters.128 Canada does not currently require pre-arranged plans for fire response or marine salvage. • TC’s National Marine Oil Spill Preparedness and Response Regime has been in place since 1995 and sets out a national preparedness plan for responding to oil spills.129 Work is in progress for responding to spills of other hazardous materials.130 Internationally, certain passenger vessels are required to have SAR cooperation plans that were developed with the vessel crew, the vessel owner, and SAR services.131 This plan must be available to responders in the event of an emergency and include provisions for periodic exercises. In Canada, this requirement is partially incorporated into the Navigation Safety Regulations, 2020. TC is proposing some changes to the CSA 2001 to strengthen preparedness requirements. One of the proposed changes would be to require “vessels to have arrangements for firefighting and salvage services, and a response specialist to work with the Government of Canada and other partners to manage the incident.”132 In June 2023, the CSA 2001 was amended to give the Governor in Council the authority to make regulations, on the recommendation of the Minister, “respecting arrangements for emergency services, including
127 Earlier versions of regulations required joint ship and shore fire drills. (Source: Transport Canada, SOR/2005- 280, Board and Fire Drill and Means of Exit Regulations, section 139 [repealed and replaced by SOR/2010- 83]). These requirements were removed in 2010 because they had proven to be “impracticable or impossible to enforce.” (Source: Government of Canada, Canada Gazette, Part I, Vol. 143, No. 41 [10 October 2009], Fire and Boat Drills Regulations, Regulatory Impact Analysis Statement, p. 3081). 128 U.S. Code of Federal Regulations, Title 33, Chapter I, Subchapter O, Part 155, Subpart I: Salvage and Marine Firefighting. 129 Transport Canada, “National Oil Spill Preparedness and Response Regime,” Overview, at https://tc.canada.ca/en/marine-transportation/marine-safety/national-oil-spill-preparedness-response- regime-0 (last accessed on 27 May 2025) 130 Transport Canada, “Marine Pollution Preparedness, Response and Recovery Discussion Paper,” at https://tc.canada.ca/sites/default/files/2023-01/MPPRR%20Paper_EN1.pdf (last accessed on 27 May 2025). 131 International Maritime Organization, International Convention for the Safety of Life at Sea, 1974 (2022), Chapter V, Regulation 7, paragraph 3. 132 Transport Canada, “Marine Pollution Preparedness, Response and Recovery Discussion Paper,” at https://tc.canada.ca/sites/default/files/2023-01/MPPRR%20Paper_EN1.pdf (last accessed on 27 May 2025), p. 5.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 62 requiring vessels or classes of vessels to enter into such arrangements.”133 In May 2024, TC indicated that work to develop regulations under this provision of the CSA 2001 is underway. 1.17 Life-saving equipment The Holiday Island had the required life-saving equipment on board.134 On each side of the vessel, the Holiday Island had • one 100-person life raft that was connected to the MESs, • one 100-person life raft that can be linked to an MES, • one 50-person life raft that can be linked to an MES, and • 1 davit-launched rescue boat. The Holiday Island carried 420 adult lifejackets and 40 child lifejackets for passengers, as well as an additional 17 lifejackets for the crew. Adult and child lifejackets were stored together, and some locker doors were mislabelled. The vessel did not carry infant lifejackets, nor was it required to at the time of the occurrence.135 At least 2 passengers with infants did not have access to lifejackets for the infants. As well, when the lifejackets were being distributed, some children initially received adult-sized lifejackets and some adults received child-sized lifejackets. The MESs had been installed in the spring of 2022 as a replacement for the davit-launched life rafts.136 To deploy the MES on each side, a crew member used 2 manual pumps, first to remove the protective door and then to deploy the slide and life raft. This process took just over a minute. Each MES slide could transfer 2 people at a time from the evacuation station directly to a 100-person life raft. Additional life rafts could be deployed and linked to the first life raft. In this occurrence, 1 crew member helped passengers in the life raft at the bottom of each slide. The passengers then helped one another as they continued onto the responding vessels for the trip to the dock. Because of the immediate transfer, the linked life rafts were not needed. Some crew members, firefighters, and other persons on the vessel also used the MES for rotating off the vessel.
133 Government of Canada, Canada Shipping Act, 2001 (as amended 22 June 2023), subsection 120(1), paragraph s.1. 134 Transport Canada, C.R.C., c. 1436, Life Saving Equipment Regulations (as amended 22 December 2022), section 14. Requirements depend on the vessel and on the type of voyage. The Holiday Island was a non– Safety Convention ship with over 12 passengers on a Class III home-trade voyage. 135 According to the Life Saving Equipment Regulations (Transport Canada, C.R.C., c. 1436, as amended 22 December 2022, paragraph 16(1)f)), enough lifejackets for each member of the complement are required. The greater of 10% of the complement or 1 for each child on board must be suitable for children. The Holiday Island carried manufacturer statements of compliance for the adult and child lifejackets carried on board. The Vessel Construction and Equipment Regulations requires passenger vessels to carry sufficient infant lifejackets for all infants on board as of 20 December 2024. 136 An MES may be substituted for a life raft if the MES is of at least equal capacity and meets the regulatory requirements. See Transport Canada, C.R.C., c. 1436, Life Saving Equipment Regulations (as amended 22 December 2022), section 5.2.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 63
Twelve of the 22 crew on board at the time of the occurrence had taken MES training in the spring of 2022. Of the 10 who had not taken this training, 7 had emergency duties related to assisting passengers and launching the MESs. Finding: Other The MESs installed on the vessel contributed to the safe and rapid evacuation of passengers. 1.18 Transport Canada oversight TC is responsible for developing regulations and ensuring that vessels comply with them. For vessels 24 m in length and above, TC delegates most statutory inspections to ROs through the DSIP. 1.18.1 Delegated Statutory Inspection Program The DSIP was implemented in 2001 and became mandatory for Canadian vessels 24 m in length and above in 2014.137 Through the DSIP, ROs complete the inspections required under section 16 of the CSA 2001 and deliver certain Canadian maritime documents. The Holiday Island was enrolled in the DSIP as a fully delegated vessel and was in class with Lloyd’s Register. The last annual safety inspection certificate was issued to the Holiday Island by the RO on 11 May 2022.138 At the time of the occurrence, TC had a target of completing compliance inspections on 25% of the delegated vessels each year. TC uses a risk-based approach to target delegated vessels. Compliance inspections provide an opportunity to verify the level of compliance on delegated vessels. Compliance inspections also provide an opportunity to oversee the performance of ROs by monitoring the type and severity of deficiencies found during compliance inspections. TC maintains responsibility for the registration of vessels, the determination of safe manning, and ensuring compliance with the Maritime Occupational Health and Safety Regulations and the International Ship and Port Facility Security Code. The authority to grant exemptions from regulatory requirements is likewise solely reserved for TC’s Marine Technical Review Board. Lastly, TC has sole responsibility for enforcement.
137 Of the 5444 passenger vessels and ferries listed in the Transport Canada registries on 08 August 2024, 275 are 24 m or longer. Of these 275 vessels, 163 were built in 1990 or before, 36 were built between 1991 and 2000, 30 were built between 2001 and 2010, and 45 were built between 2011 and the date of the query. Previous TSB marine transportation safety investigations (M20P0229 and M20A0160) have found that registry numbers do not reflect exact numbers of active vessels (for example, the Holiday Island was still registered as an active passenger vessel on the date of this query), and that they rather give some indication of the age of the Canadian fleet of passenger vessels in the DSIP. See Transport Canada, Vessel Registration Query System, at https://wwwapps.tc.gc.ca/Saf-Sec-Sur/4/vrqs-srib/eng/vessel-registrations (last accessed 28 May 2025). 138 A safety inspection certificate certifies that a vessel has been duly inspected in accordance with subsection 16(2) of the Canada Shipping Act, 2001, and that the vessel meets the requirements of regulations made under Part 4 of the Act.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 64 In June 2016, 2 TC marine safety inspectors carried out a compliance inspection on the Holiday Island. After this inspection found structural defects, 1 of these marine safety inspectors was transferred to TC Programs Group to work on the ferry program. As a technical advisor to TC Programs Group, he produced 1 oversight report on behalf of the AR, as well as coordinated ongoing maintenance requirements, oversaw technical operations on board the vessel, and worked on capital projects. The assignment continued until his departure in mid-2018, after which time the role changed to focus on capital projects. 1.19 Organizational and management factors Gaps in organizational risk management, oversight, and hazard reporting are examples of organizational and management factors that can affect safety. At the organizational and management levels of an operation, these factors can contribute to unsafe conditions, impact human performance, and inhibit the proactive identification and mitigation of risk. 1.19.1 Practical drift In contemporary safety science, practical drift is a term used to describe how work inside a complex organization may demonstrate a slow, steady uncoupling of practice from written procedure.139 This subtle departure from written procedure is invariably connected to the various priorities and operational constraints faced by organizations in transportation industries. Organizations develop rules, policies, and procedures that are aimed at setting safe limits. As people in organizations respond to external pressures, they adjust their manner of working to achieve or maintain productivity, resulting in a departure from written procedures. If these changes do not result in a negative consequence, they may be recognized as acceptable. When such actions are repeated over time, these decisions result in adaptations to the procedures themselves and deviations from prescribed limits, leading to unsafe practices.140 A complex system comprises many elements (e.g. equipment, processes, and procedures) whose interactions are not always visible to all people in that organization. The risk in gradually adjusting procedures, without evaluating the impact of these changes to the other parts of the system, is that they can drift toward the boundaries of safe operation. 1.20 Cognition and human performance There are many factors that can influence the cognitive processes of humans as we respond to developing situations. For example, our responses can be affected by various types of biases, heuristics, or other perceptions that are based on our individual experiences,
139 S.A. Snook, Friendly fire: The accidental shootdown of US Black Hawks over northern Iraq. (Princeton University Press, 2000). 140 J. Rasmussen, “Risk Management in a Dynamic Society: A Modeling Problem,” in Safety Science, Vol. 27, Issue 2/3 (1997), pp. 183–213.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 65
training, and beliefs. These factors can shape the ways that individuals respond to a given situation. 1.20.1 Perception of risk Generally, risk perception is based on the ability to evaluate risks associated with a particular hazard. This involves assessing the probability of that hazard occurring and the severity of any consequence from it. The ability to see and detect risk depends particularly on a person’s own understanding and tolerance of risk. Many factors influence individual risk perception and tolerance, including pressure to accept risk, team dynamics and communication, personal experience, the approval of others, and confidence in one’s ability to mitigate risk (for example, the ability to monitor the effectiveness of a repair, alerting equipment, training, and drills). Regional economic conditions, crew availability issues, and regulatory systems may influence the operational priorities, choices, and decisions that crew and masters face as they strive to operate safely and adhere to the daily sailing schedule. Common risks that are familiar to ferry crews include navigation challenges, adverse weather, and ensuring minimum crew levels. Safety risks associated with maintenance activities that occur less often may not be straightforward to recognize, especially when the resources of time and crewing are limited alongside a busy sailing schedule. 1.20.2 Diffused responsibility Diffused responsibility can suppress interaction or intervention by encouraging the perception that someone else is better qualified to act, has more authority to act, or has better proximity to act. Diffused responsibility is more likely to occur in instances when many people are involved or when there is more than 1 leader or person of authority involved. Diffused responsibility is seen as an indirect outcome of a weak or non-interacting team in which members of the group act in loose isolation without a defined common goal. 1.21 Related occurrences In the 10 years before the occurrence, 400 fires on commercial vessels were reported to the TSB. Of these fires, 60 (15%) were on board passenger vessels or ferries. None of these 60 occurrences resulted in a total loss and 21 were either in or related to the engine room. The TSB has investigated marine occurrences similar to this occurrence that have had issues related to fixed fire suppression systems, passenger management, and the role of the AR. International accident investigation bodies have also investigated similar marine occurrences (Appendix E). Data on all marine transportation occurrences since 1995 are available on the TSB website at https://www.tsb.gc.ca/eng/stats/marine/data-6.html. This information is updated monthly.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 66 1.22 TSB recommendations 1.22.1 Carbon dioxide fixed fire suppression systems On 12 May 2003, the roll-on/roll-off passenger ferry Queen of Surrey suffered a diesel oil fire in the engine room.141 Some of the CO2 escaped when the CO2 fixed fire suppression system was activated, although enough reached the engine room to extinguish the fire. Following this occurrence, the Board recommended that the Department of Transport, in conjunction with other stakeholders, review Canadian and international marine regulations respecting fixed fire- extinguishing systems to ensure that their design, maintenance, inspection, and testing regimes effectively demonstrate continued structural and functional integrity. TSB Recommendation M05-05 The Vessel Fire Safety Regulations describe standards that are additional or complementary to IMO’s International Convention for the Safety of Life at Sea (SOLAS), 1974 regulations and codes. The IMO’s International Code for Fire Safety Systems relates to system design and installation requirements for extinguishing systems. The Vessel Fire Safety Regulations came into force in February 2017 and applied at least in part to all vessels after February 2018. Between 2003 and 2018, there were no instances of a major engine room fire on Canadian vessels in which the fixed fire-extinguishing system was an issue. In 2018, the Board considered the response to Recommendation M05-05 to be Fully Satisfactory. The TSB’s assessment of this response, as well as previous responses and assessments, are available on the TSB website.142 The TSB notes that, even when the response to a recommendation is rated as Fully Satisfactory, there may continue to be residual risk. Since 2018, there have been a number of instances in which the unsuccessful operation of a CO2 fixed fire suppression system was a factor. In January 2024, the Board issued a safety concern about the level of knowledge of the operation of CO2 fixed fire suppression systems as part of its report on the loss of the fishing vessel Atlantic Destiny.143 1.22.2 Crew preparedness and realistic drills On 20 August 2022, the passenger ferry Sam McBride, with 6 crew members and approximately 910 passengers on board, struck the dock while berthing at the Jack Layton Ferry Terminal in Toronto, Ontario.144 Twenty passengers were reported injured. No
141 TSB Marine Investigation Report M03W0073. 142 TSB Recommendation M05-05: Design, inspection, and testing of the CO2 system (issued February 2006), accessible at https://www.tsb.gc.ca/eng/recommandations-recommendations/marine/2005/rec-m0505.html (last accessed 29 May 2025) 143 "Knowledge of the operation of carbon dioxide fixed fire suppression systems,” in TSB Marine Transportation Safety Investigation M21A0041. 144 TSB Marine Transportation Safety Investigation Report M22C0231.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 67
pollution was reported. The vessel and dock sustained minor damage. Emergency services responded to the occurrence and 6 of the injured passengers were taken to hospital. Following this occurrence, the Board recommended that the Department of Transport implement a requirement for crew members of all passenger vessels, including those on sheltered waters voyages, to complete appropriate training in passenger safety management. TSB Recommendation M24-01 In this occurrence, although a portion of the Holiday Island crew had the required passenger management training, drills as conducted did not include passengers. Therefore, operators could not evaluate the preparedness of their crews to effectively manage passengers during an emergency. 1.22.3 Passenger vessel evacuation procedures The Life Saving Equipment Regulations require all passenger vessels to have an evacuation procedure that dictates how all passengers and crew members will be evacuated from the vessel within 30 minutes of the abandon ship signal being given. Although this regulatory requirement is in place, TC has no formal procedure to assess if this requirement is being met. Operators who develop evacuation procedures have no approval process to confirm their procedure meets the requirement or to obtain approval from the regulator. Following the occurrence involving the Sam McBride, the Board recommended that the Department of Transport implement a formal validation and approval process for passenger vessel evacuation procedures. TSB Recommendation M24-02 The passenger evacuation from the Holiday Island took 56 minutes. As well, the investigation found that drills were not conducted with passengers. 1.22.4 Passenger counting Following the same occurrence involving the Sam McBride, the Board recommended that the Department of Transport implement a process to validate that passenger vessels are keeping an accurate count of all passengers, including a separate count of the number of children and infants, on all voyages. TSB Recommendation M24-03 During this occurrence, passengers were not accurately counted when they boarded the Holiday Island, and different counts were reported to the authorities. Furthermore, since there was no count of passengers when they mustered or evacuated the vessel, there was no way to determine if a passenger was unaccounted for. Lastly, the investigation found that drills were not conducted with passengers to practise effective accounting.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 68 1.23 TSB Watchlist The TSB Watchlist identifies the key safety issues that need to be addressed to make Canada’s transportation system even safer. Regulatory surveillance is a Watchlist 2022 issue. TC’s surveillance program is not always effective. The CSA 2001 places responsibility for safety on ARs; however, many ARs and operators have limited awareness of key sections of the CSA 2001 or of the broader regulatory framework, as this occurrence demonstrates. Safety management is a Watchlist 2022 issue. SMS is an internationally recognized framework that allows companies to identify hazards, manage risks, and make operations safer—ideally before an accident occurs.145 Although the issue of safety management has been on the Watchlist since 2010 and industry awareness about SMS has slowly increased since that time, TSB investigation reports continue to note deficiencies and concerns. Even when operators have safety management processes in place, as in this occurrence, hazards are not being identified and effective risk-mitigation measures are not being implemented. 1.24 TSB laboratory reports The TSB completed the following laboratory reports in support of this investigation: • LP066/2022 – NVM [non-volatile memory] Recovery – PC [personal computer] • LP107/2022 – Laser Scanning and Publishing • LP113/2022 – Fire Monitoring System Analysis • LP129/2022 – Fuel System Components Examination • LP013/2023 – Engine System Analysis • LP053/2024 – VDR [voyage data recorder] Data Recovery and Analysis
145 As of 2024, the Marine Safety Management System Regulations require most commercial vessels to have a documented safety management system. These regulations do not apply to fishing vessels and most non- propelled vessels (Transport Canada, SOR/2024-133). ACTION REQUIRED The issue of regulatory surveillance in marine transportation will remain on the Watchlist until TC provides more oversight of the commercial vessel inspection process by demonstrating that its surveillance and monitoring are effective in ensuring that authorized representatives and recognized organizations are ensuring vessel compliance with regulatory requirements; and until TC demonstrates an increase in proactive surveillance. ACTION REQUIRED The issue of safety management in marine transportation will remain on the Watchlist until • TC implements regulations requiring all commercial operators to have formal safety management processes; and • operators that do have an SMS demonstrate to TC that it is working—that hazards are being identified and effective risk-mitigation measures are being implemented.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 69
- 0
ANALYSIS The analysis will look at the causes of the engine room fire and how it spread on the Holiday Island. As well, the analysis will look at the role of the authorized representative (AR) in vessel maintenance, safety procedures, and emergency management, and at how well this role is understood in the industry. Finally, the analysis will look at the preparedness of Canadian resources to respond to marine emergencies. 2.1 Engine room fire 2.1.1 Fuel rail leak and repairs On 20 June 2022, a fuel oil leak was identified on the fuel rail for the forward main engine of the Holiday Island. Over the course of the following month, several temporary repairs were made to the rail. On 22 July 2022, while the vessel was on its 2nd voyage of the day, the last temporary repair failed, spraying fuel onto hot engine surfaces. Fuel line leaks are not unusual on vessels. Because of the serious potential consequences, industry guidelines emphasize that special attention should be paid to fire risks during maintenance work, and that repairs should use replacement parts that comply with system specifications. However, in practice, vessels sometimes continue to operate with patches and temporary repairs.146 Although engine room fires are recognized as a serious consequence of fuel line leaks, engine room fires are rare. Throughout their careers, engineers may accumulate experience with fuel line leaks and similar failures that have no serious consequences, lowering their perception of the associated risks over time. On the Holiday Island, the application of a series of temporary repairs to fix the fuel rail leak was deemed acceptable under the circumstances and the risks were perceived to be low. The crew and shore staff were aware that a service interruption would be needed to repair by welding or to replace the damaged fuel rail. Without a formal risk assessment process to assess the impact of repairs to defects, the risks associated with continuing operations without making a permanent repair went unrecognized and the focus remained on the need to keep the ferry service on schedule. Over the course of a month, the leak in the fuel rail progressed from a pinhole to a crack that was over 75% of the circumference of the fuel rail, and the failure rate of the temporary repairs increased. As required by the safety management system (SMS), Northumberland Ferries Limited (NFL) crew and shore staff discussed the temporary repairs and also
146 For example, see TSB marine transportation safety investigation reports M19C0403 and M18P0014. For an international example, see a recent United Kingdom Marine Accident Investigation Board report (Report on the investigation of 2 catastrophic engine failures, 1 resulting in a fire on board the ro-ro passenger ferry Wight Sky, at https://assets.publishing.service.gov.uk/media/6267cc85e90e071690c1b679/2022-4-WightSky- Report.pdf [last accessed 02 June 2025]).
TRANSPORTATION SAFETY BOARD OF CANADA ■ 70 communicated with the engine manufacturer and external consultants. However, communication was related to technical steps more than the risk. On the day before the occurrence, the fuel rail had been cut all the way through to apply a section of flexible hose; this hose was made of material unsuitable for fuel or oil transfer. Finding as to causes and contributing factors For approximately a month after the initial leak in the fuel rail was observed, a series of temporary repairs using non-standard materials and methods was made while the vessel remained in service. Crew and shore staff were accustomed to applying patches and making temporary repairs as part of their routine day-to-day work. This work meant that NFL was able to keep the ferry service running during the peak tourist season; consequently, crew received acknowledgements and thanks from the shore staff on the repairs. Although crew members relayed their concern to shore staff about the final (temporary) repair, the level of communication between the crew and shore staff regarding the level of risk associated with the temporary repair was minimal. Because no ferry runs were cancelled and the crew did not consider the fuel line repair to be a reportable repair, neither the AR nor the recognized organization responsible for certifying the vessel were notified about the repairs to the fuel line. Finding as to risk If the hazards posed by temporary repairs to a vessel are not objectively assessed in order to counter operational pressures, the practice of temporary repairs may be normalized. Consequently, risks may go unidentified or unmitigated, jeopardizing people on board and the vessel. When the final repair to the fuel rail failed, the fuel sprayed over an area that was one of the hottest parts of the engine. The fuel spray made contact with hot exhaust surfaces that were at temperatures well in excess of the auto-ignition temperature of marine gas oil (MGO) (Figure 9). Although the parts of an engine that exceed 220 ℃ when the engine is operating should be protected by fireproof insulation, large fuel sprays can spread as vapour or liquid and reach hot engine components through small gaps, even where insulation is installed. Finding as to causes and contributing factors When the final temporary repair to the leaking fuel rail failed, fuel sprayed onto the hot engine components and ignited. Crew members initially attempted to control the fire using a direct water spray from a fire hose, which had been the 1st step in most fire drills on the Holiday Island. However, diesel fires may continue to burn and even spread when sprayed directly with water because diesel oil will float. For this reason, the recommendation for fighting a diesel fire is to use foam, water fog, dry chemical powder, or carbon dioxide (CO2) rather than jets of water.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 71
Finding as to causes and contributing factors Water from a fire hose likely spread the burning engine fuel around the engine room and contributed to the spread of the fire. One way to limit fire growth is to control the availability of flammable materials such as engine fuel. On the Holiday Island, the main engines were supplied from the day tank. The crew believed that the fuel supply had been fully shut off by the remote fuel shut-off control for the main engine fuel supply. However, post-occurrence examination showed that a knuckle of the valve assembly was unlubricated and had seized, leaving the fuel supply valve partially open. Consequently, the full contents of the day tank , part of which may have accumulated in the bilge, supplied fuel to the fire. Finding as to causes and contributing factors An unlubricated component of the fuel valve assembly prevented the fuel valve from closing fully, allowing the contents of the day tank to drain through the damaged fuel rail and fuel the fire in the engine room. 2.1.2 Use of the carbon dioxide fixed fire suppression system CO2 fixed fire suppression systems are used to smother fire by displacing the oxygen available for the fire to persist. After CO2 is released into a space, the space must remain sealed so that it can cool below the temperature at which a fire could reignite if air were reintroduced; cooling may take many hours or even days. Consequently, it is also important to release the CO2 as soon as possible to limit damage within the space and reduce the risk of the fire spreading beyond the space. If the fire has not yet reached its maximum intensity, this may also increase the effectiveness of the fixed fire suppression system and reduce the cooling time needed. On the Holiday Island, the primary means to release CO2 was from 1 of the 2 remote CO2 release mechanisms. A remote release mechanism was located on each bridge and installed with a common cable. Pulling 1 of the CO2 release mechanisms pulled this common cable, which should then have pulled a second cable to activate the CO2 cylinders. When the master first attempted to release the CO2, he pulled the release mechanism to a point where he felt resistance and believed this indicated that the CO2 was released. However, this action only removed the slack in the common cable between the bridges; the remote release mechanism did not provide any other indication of success. The master and the fire team became aware that the release of CO2 had not been effective only when they observed that the fire was continuing to grow. At this point, they used the local release mechanism to successfully release the CO2. However, the 15-minute delay meant that the CO2 was not released until 36 minutes after the fire was detected. This additional time allowed the fire to build in size and likely allowed it to reach the maximum temperature for a diesel fire.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 72 The instructions to “pull handle hard,” commonly given on placards for such systems, did not give a comparison point for how hard to pull, the approximate length of the cable once pulled, or any similar detail to use for a measure of success. Given there is no practical way to activate CO2 systems safely in drills and training, guidance in the form of instructions and feedback is critical for success. For example, instructions should include a reminder to check the control panel of the fire detection and alarm system for an indication of successful release. The TSB has investigated a number of occurrences147 in which insufficient knowledge of the use of CO2 fixed fire suppression systems led to delays or failures during a fire response. Other accident investigation boards have made similar observations.148 Following the fire and flooding on board the Atlantic Destiny, the Board also issued a safety concern.149 Finding as to causes and contributing factors The resistance felt when the CO2 release mechanism cable was pulled provided a false indication that the CO2 had been released and there was no unambiguous, direct feedback from the remote-release mechanism to indicate success. As well, the posted guidance was not explicit. Consequently, the CO2 release was delayed, allowing the fire to grow. After everyone is safely out of a space where there is a fire and before CO2 is released, the space must be sealed; sealing the space means that additional air cannot enter before the fire area has cooled below the temperature at which the fire could reignite. To effectively and quickly use a CO2 fixed fire suppression system, the fire response team must know which vents, hatches, fans, and doors need to be closed to seal the space. In this occurrence, the crew members responsible for closing vents and managing the fire scene began closing all vents shortly after the fire alarm went off and the announcement was made. However, they did not have a reference that would highlight the location of all the engine room vents that needed to be closed to isolate the space. Consequently, when they were directed to deploy the anchors and then prepare to abandon ship, the main engine room vents had not been closed, and therefore were open when the CO2 was released. By the time crew members returned, vent 15 for the engine room air intake could not be closed because the damper handle could not be reached due to smoke and heat. Additionally, the handle for vent 9, the 2nd air intake vent, was not configured correctly and looked closed when it was actually open. The air intake vent closest to the fire served as an exhaust for the fire and the 2nd air intake vent continued to supply air, increasing the flow of air to the fire (Figure 14) and likely displacing the CO2 that had been released.
147 TSB Marine transportation safety investigation reports M21A0041, M19C0403, and M15C0045. 148 Australian Transport Safety Bureau (MO-2019-004), “Suspected engine room fire and passenger evacuation involving domestic commercial vessel Fitzroy Flyer, 13km ENE of Cairns, Queensland on 29 March 2019,” at https://www.atsb.gov.au/publications/investigation_reports/2019/mair/mo-2019-004 (last accessed on 03 June 2025); Danish Maritime Accident Investigation Board, “Summary report on engine room fire on board World Calima” (19 February 2018), at https://safety4sea.com/wp-content/uploads/2018/02/DMAIB- WORLD-CALIMA-Summary-report-on-engine-room-fire-2018_02.pdf (last accessed on 03 June 2025). 149 TSB Marine Transportation Safety Investigation Report M21A0041.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 73
Finding as to causes and contributing factors The engine room space was not completely sealed and air continued to enter the space through open vents, likely displacing the released CO2 and also adding oxygen to the fire. Consequently, the fire continued to burn. 2.1.3 Engine room flooding The fire in the engine room damaged a flexible connection in the main engine cooling system, resulting in seawater leaking into the engine room. Because the engine room had been closed for the CO2 release and was inaccessible because of the fire, the leak went unnoticed. Flexible connections for the main engine cooling system are located close to the main engine and directly below the turbo assembly. For this reason, they were required by both Transport Canada (TC) regulations and classification society rules to be protected against heat and fire. Such protection gives a crew more time to respond to a fire or to evacuate a vessel before flooding can affect the vessel’s stability and add to the risk to the crew, vessel, and the environment. However, the flexible connections between the cooling systems and the main engines on the Holiday Island were not made of heat-resistant material, nor were they protected by a fire protection sleeve. Finding as to causes and contributing factors The flexible connection between the cooling system and the forward main engine was not protected against heat and fire. When the flexible connection was damaged by the fire, seawater from the vessel’s cooling system entered and began flooding the closed engine room. As water entered the vessel, it accumulated in the engine room and other places. The weight of the accumulating water was not evenly distributed and caused the vessel to begin listing to port. Shortly after the engine was shut down, the master beached the vessel on a sandbar, where it remained for close to 8 hours. Although the accumulating water was negatively affecting the vessel’s stability, resting on the sandbar made the Holiday Island more stable for transferring passengers and also kept the vessel off the ferry track (i.e., the route travelled by the Confederation). Finding: Other Beaching the Holiday Island on a sandbar stabilized the vessel during the passenger evacuation. When the tide rose and the vessel floated free, the port list increased within an hour from approximately 3° to close to 10°. In response to such a negative change in the vessel’s stability, the crew investigated the extent of water ingress by sounding the tanks. Because the engine room was sealed for the fire response, the greatest accumulation of water was not noted; however, when the space was re-entered, the water was found to be above the level of the engine block, a height of approximately 3.58 m above the tank top. At their
TRANSPORTATION SAFETY BOARD OF CANADA ■ 74 highest, water levels in the engine room covered the engine block and the turbo assembly and likely helped extinguish the fire. The Holiday Island’s damage stability booklet described worst-case scenarios with heel angles of less than 4°. However, this critical stability information was not readily available to the bridge team because it was found only in the stability booklet and was not integrated into the emergency procedures. As a result, the team was not aware that, after the vessel floated free, the heel angle of 10° was more than double the worst-case scenarios. Consequently, the crew on the vessel perceived a need to investigate if there was water ingress instead of evaluating the potential risk of capsizing. Finding as to risk Once a vessel lists beyond its documented worst-case stability scenarios, the risk of sudden capsizing becomes high, posing a risk to the lives of the people on board. 2.2 Responsibilities of the authorized representative The current role of a vessel’s AR was created in the Canada Shipping Act, 2001 (CSA 2001) as 1 of a number of changes to define the responsibilities of vessel owners more clearly. The role of the AR was extended from the definition in its previous version, where the AR was simply a single point of contact. The CSA 2001 gives the AR responsibility for all matters related to the vessel that are not otherwise assigned in it and its regulations. This includes broad responsibility for safety on the vessel, including development of procedures for safe operation and for dealing with emergencies. Even where the master or another person is named, the AR is responsible for ensuring that person fulfills their responsibility. Given the scope of the AR’s responsibilities, the relationship between the master and AR is critical and collaboration is essential for the continued safe operation of a vessel. This collaboration requires ongoing assessment by both the master and the AR to ensure that procedures are understood and followed, that they accurately represent all operations and that they also comply with regulations. 2.2.1 Safety management systems A common approach for ensuring that a vessel has procedures for safe operation is through the implementation of an SMS. Documented policies and procedures for operations and for emergencies are integrated in the SMS. The SMS and its operational and emergency procedures are examined at many points and by many levels of oversight: • The AR is responsible for ensuring that such procedures are available to the master. • The master is responsible for conducting drills on the emergency procedures and ensuring crew are trained and operations on board are conducted safely. • The classification society that issues the SMS certificate audits the SMS regularly. • During inspections for certification, TC inspectors or recognized organization surveyors may witness and time drills.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 75
In this occurrence, the Holiday Island had an SMS with current certification issued by Lloyd’s Register. Assessment of procedures should be frequent to ensure continuous improvement of the system. For example, after a drill, it is critical to carry out a debrief, identify any gaps in the procedures or drills, and update the procedures as necessary. The NFL SMS included a form for crew member feedback. While most of the emergency procedures had not changed in the 4 years before the occurrence, the installation of the MES created a significant change to the abandon ship procedure. Also, the crew shared handwritten information related to vents that was not in the documented procedures. The SMS manuals, including the emergency response manual, were not kept on the bridge or in the engine control room where the emergency procedures were likely to be carried out. Recurring maintenance issues, such as those related to the fuel system, were not identified as a reportable incident. Although the SMS did include a process for reviewing procedures, the investigation found no record of this process being used. Finding as to risk If ARs do not ensure that procedures related to vessel operation and safety are periodically evaluated and updated with feedback from those who use them, there is a risk that these procedures will not support an effective emergency response. 2.2.1.1 Emergency procedures During an emergency, time and cognitive resources are limited and should be focused on the emergency itself. It is critical to ensure that all information required in an emergency is part of the emergency procedures. Furthermore, this information should be at a level of vessel-specific detail that allows it to be used immediately. Other TSB investigations have shown that the absence of such information has been a factor in emergency responses.150 This occurrence was complex as it involved several factors: an engine room fire and subsequent flooding, passengers (including children and disabled persons), extremely warm weather, crew with varying levels of qualifications and experience in their roles and with the life-saving equipment, a large number of first responders, and response teams located throughout the vessel. This complexity increased the need for clear procedures. However, the Holiday Island’s emergency procedures were missing the following: • Specific instructions for the remote release of the CO2 • Direction in the fire response procedure to close the correct vents to isolate specific locations • Pre-identified priorities for boundary cooling • A procedure to account for passengers by counting them during an emergency
150 For examples, see TSB marine transportation safety investigation reports M22A0332, M21A0041, and M13M0287.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 76 Additionally, critical stability information was not readily available to the master and crew. Finding as to risk If emergency procedures do not contain explicit, vessel-specific information that can be used immediately, there is a risk that crew members will not have critical information needed to effectively set priorities and make decisions during an emergency. Regulations require procedures for the complete evacuation of passengers and crew. These procedures existed in the NFL SMS and were practiced in abandon ship drills. However, while there may be situations where some crew members remain on board to continue the emergency response, there are no requirements to have a procedure to guide actions taken after a partial evacuation. In this occurrence, there was no ongoing evaluation of risk on board the vessel to determine when people still on board should evacuate, nor was there any guidance to support such an evaluation. For example, when the temperature of the fuel tank was found to be near the flashpoint for MGO and the perceived risk of explosion was high, indirect discussions about the evacuation took place between the master, NFL management ashore, first responders, TC, and Joint Rescue Coordination Centre (JRCC). Consequently, there was a delay of at least 20 minutes before a decision was made to completely evacuate the vessel. Recent occurrences151 show that a partial evacuation is not unusual in marine emergencies. Findings as to risk If a vessel’s SMS does not include a decision process for the period of the emergency response that follows a partial abandonment, decisions may be delayed or tasks may be missed, increasing the risk to people on board and to the safety of the vessel. 2.2.1.2 Emergency drills On the Holiday Island, crews routinely drilled every 4 days, matching crew rotations and providing any new crew the opportunity to practice. Drills were always performed in port within the 20- to 30-minute period that was needed for embarking and disembarking vehicles and passengers. Consequently, drills were short and simple to avoid a delay in departure time. Drills were rotated equally through 8 locations on board, even though engine room fires are more likely than fires in other locations and of more serious consequence to the vessel. The Holiday Island carried foam extinguishing agents and portable foam applicators that were available to the crew at the time of the fire. However, foam was rarely used or discussed in drills and was not included in NFL’s emergency checklist for a fire response. On the Holiday Island, neither fire drills nor abandon ship drills included anyone playing the role of passengers. Therefore, crew members had not had experience with passengers during simulated emergencies on board, including passengers who were unable or unwilling to respond to instructions.
151 TSB marine transportation safety investigation reports M21P0197, M21A0041, M18P0014, and M18C0225.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 77
As with all types of emergency response, fire and abandon ship drills are most effective if there is a mix of activity to develop automatic responses, such as donning fire gear or confirming tasks are complete; varied scenarios that represent likely situations, such as the probable locations of fires; and realistic scenarios to practice adjusting to problems in an emergency, such as missing equipment or passengers who are unable or unwilling to respond to instructions. In this occurrence, crew members did what they had practiced in the drills. They successfully used the fire hoses to maintain boundary cooling for more than 8 hours. Crew members who did not always perform drills with safety equipment were unfamiliar with it and did not initially don it to perform their tasks. As well, crew members experienced some delays in responding to problems, such as interruptions for dropping anchor, and changes in leadership at the scene of the fire. Because the occurrence did not happen in port where they usually drilled and where it was clear what radio channel to use, there was some confusion over communication using the portable radios. As well, those portable radios that were functional in the emergency were split between teams carrying out firefighting and abandon ship procedures at the same time. In some cases, team leaders needed to send messengers to maintain communication. This delayed communication as the messengers had to travel between decks in hot and humid conditions, and this took crew away from their tasks in the emergency. Finding as to risk If shipboard emergency drills do not represent realistic scenarios, there is a risk that crews will be unable to respond effectively to an emergency. On the Holiday Island, like on many other vessels in the marine transportation industry, emergency procedures were drilled singly: when a fire drill ended, the crew would muster for an abandon ship drill. All crew members had roles in both the fire response procedure and the abandon ship procedure. However, because the procedures were drilled sequentially, there was no opportunity to identify any potential problems related to this overlap. For example, the leader of the fire response at the scene also had a key role in the abandon ship procedure; when he left the scene of the fire, the fire response team had to adjust. The muster list was not examined for overlap of duties during audits or inspections, and such an examination is not expected or required for domestic vessels. The Life Saving Equipment Regulations specify requirements for emergencies, such as the maximum time allowed to complete an evacuation (abandon ship order), and the Fire and Boats Drills Regulations state that drills should be carried out as if there were an actual emergency. However, there is no requirement for anyone to verify that a vessel’s evacuation plans can be implemented, and there is no requirement to practise such a drill with a
TRANSPORTATION SAFETY BOARD OF CANADA ■ 78 realistic number of passengers, although TC has published a ship safety bulletin152 in which the practice is encouraged. Accordingly, in a complex scenario—such as a fire combined with beaching—the number of crew members available may not be adequate to respond to all aspects of the emergency. Although regulations set out a minimum level of safety, vessel ARs must consider all of the risks faced by the vessel. Simultaneous emergencies, especially an emergency combined with an evacuation, can be expected, especially in the marine environment, where vessel abandonment is complex and presents many risks. If drills are planned around meeting the minimum regulatory requirements, the primary goal of being prepared for actual, complex emergencies may not be reached. Finding as to risk If a vessel’s muster list assigns crew members to duties in multiple emergency procedures, then leadership and communication issues, delays, or other problems are likely to occur when the emergencies happen at the same time, increasing the risk to people on board, the vessel, and the environment. 2.2.1.3 Passenger management Managing passengers in an emergency is a skill that can be acquired by training and practise; the crew members who must be trained in passenger management are identified on the safe manning document. However, in this occurrence, more than half of those who were assigned roles in mustering passengers did not hold current passenger management training. As well, drills were conducted without anyone playing the role of passenger and so the crew had not had the opportunity to practise managing and tracking a large group of people. In an emergency on a passenger vessel, it is critical to plan and assign resources, on and off the vessel, that will keep track of how many passengers are on board and which passengers may need special assistance. An accurate count of passengers is also needed when they are boarding to ensure that the capacity of the vessel is respected and that enough emergency equipment is available, including lifejackets and life rafts. In 2008, the TSB issued a recommendation requiring vessels such as ferries to have passenger counts, including counts for different age categories and for any individuals who need special assistance in emergencies.153 The recommendation was closed as fully satisfactory in 2010 when the Fire and Boat Drills Regulations came into force. However, since that time a number of TSB investigations have found that passenger counts have not been accurate and that the lack of this information has placed passengers, crew, and first
152 Transport Canada, Ship Safety Bulletin 04/2022: Requirements for passenger evacuation and safety (08 February 2022), at https://tc.canada.ca/sites/default/files/2022-02/SSB-04-2022E.pdf (last accessed on 05 June 2025). 153 TSB Marine Transportation Safety Recommendation M08-01.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 79
responders at additional risk.154 In 2024, following the occurrence on the ferry Sam McBride, the TSB issued 3 recommendations, related to the safety management, evacuation, and count of passengers.155 During the Holiday Island occurrence, the shore staff, crew, and first responders did not have an accurate count of the number of passengers on board the vessel: counts varied from 182, at boarding, to the 236 passengers who were counted as they arrived at Wood Islands. Finding as to risk If there is no accurate count kept of passengers boarding a vessel, some passengers may not be accounted for in an emergency, increasing risks to passengers, crew, and first responders. In addition to not having processes in place to ensure that an accurate count of passengers was maintained, neither TC Programs Group nor NFL required ferry crews to keep a separate count of children and infants. Although this specific count is not required by regulation, regulations do require that a vessel have child-sized lifejackets equivalent to 10% of the total complement, or the number of children on board, whichever is greater. However, ensuring this requirement is met would be practically impossible without a separate count of children. Finding as to risk If a crew does not ensure that the number of lifejackets of the correct sizes is sufficient for the number of children and infants boarding the vessel, there is a risk that children and infants will not have lifejackets in an emergency. 2.2.2 The authorized representative The scope of the AR responsibilities is broad. Although these responsibilities are defined in the CSA 2001 and its associated regulations, the form of the definition varies depending on when and how the regulation was updated. There are many regulations that assign responsibility to the AR (see Appendix C), and the AR also has the residual responsibility for any requirements where the primary party responsible is not named. TC is responsible for setting a minimum level of safety in regulations and for oversight of compliance with the regulations. The current definition of the role of the AR provides a clear path for enforcement, but the need for the AR or the AR’s delegate to play a proactive role in ensuring safety is critical. For this arrangement to succeed, all of the parties involved must understand the scope of that role. Articles in industry publications and other information for vessel owners suggest that not all vessel owners understand the scope of their responsibilities; this suggests that TC’s approach of providing explanation through voluntary programs, including communications specific to individual regulations and safety
154 TSB marine transportation safety investigation reports M22A0312, M17C0179, and M13L0067. 155 TSB Marine Transportation Safety Investigation Report M22C0231.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 80 issues, is not entirely successful. Recent TSB investigations have also demonstrated that the scope of AR responsibilities is not well understood in the broader Canadian marine industry, such as in the sectors in which smaller fishing156 and commercial157 vessels operate. The AR must also keep up with changes in safety knowledge and standards. Keeping informed on the relevant sections of CSA 2001, regulations, and guidelines is not an easy task, especially for ARs responsible for older vessels such as the Holiday Island. As safety standards change, regulations change with them. Older vessels are often exempt from regulatory changes due to the costs and feasibility of making changes to meet the newer standards. However, judgment is required on the part of the AR because improved vessel safety may be achieved by exceeding the minimum standard required by regulation. Finding as to risk If ARs do not have a clear understanding of the scope of their responsibilities with respect to safety, vessels may operate without the minimum defences provided by meeting regulatory requirements, increasing the risk of incidents and accidents. As the responsible party, the AR must be aware of the regulations that apply to their vessel and keep up with safety knowledge and standards to maintain safe operations. For the Holiday Island, the Minister of Transport was the named AR according to the vessel registration. In practice, within TC, it was generally understood that the Minister of Transport was the named AR and that TC Programs Group was acting for the Minister. The contracts between TC Programs Group and NFL stated that NFL was to act as if it were the AR. However, many staff members at TC Programs Group and NFL were unsure of what was required of an AR and who was responsible for carrying out the AR’s responsibilities. The contracts defined requirements for reports from NFL to TC Programs Group, such as reports about emergency repairs,158 quarterly vessel maintenance, and any ferry cancellations. The quarterly maintenance reports were organized around costs, category of work, and timing. Some notes mention safety but most are related to costs. Furthermore, despite contractual and regulatory requirements to report on emergency repairs or safety issues, no procedures in the SMS instructed the master, or others, to report to anyone outside NFL except during emergencies. TC Programs Group was required to provide an annual inspection report to NFL. However, although some informal contact by TC Programs Group was maintained with the crew, the last formal report was issued in 2017. Through the contracts with NFL, TC Programs Group
156 TSB Marine Transportation Safety Investigation Report M20P0229. 157 TSB Marine transportation safety investigation reports M22P0259 and M21P0030. 158 Under the delegated statutory inspection program (DSIP), NFL was also required to report emergency repairs to the recognized organization. However, problems such as the damaged fuel rail in this occurrence were not considered emergency repairs, and any decision about what constitutes an emergency repair is based on the judgment of the crew.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 81
staff believed they had fully delegated the AR’s responsibilities for operations, including developing maintenance and emergency procedures; however, as the AR of the vessel, they remained responsible under CSA 2001. Although capital projects remained the responsibility of TC, NFL staff understood that they were to carry out the AR’s responsibilities for day-to-day operations. As a result, TC Programs Group was not invited to participate in the development and review of procedures, did not carry out internal audits of the vessel directly, and did not have a mechanism to carry out oversight of the vessel operator. Consequently, the immediate, operational pressures on NFL staff contributed to practical drift with respect to risk assessments, drills, and emergency procedures. Finding as to risk Without effective oversight by an AR, practical drift can emerge in the execution of a vessel’s operational and emergency procedures, and the safety objective of the CSA 2001 may not be achieved. 2.3 Canada’s preparedness for marine emergencies The occurrence involving the Holiday Island demonstrated some of the risks involved in responding to marine emergencies in Canadian waters. It also raised questions about the availability and capability of Canadian resources to respond to vessel fires. On commercial vessels, crew are equipped and trained to handle many emergencies with the resources on board the vessel. However, any emergency can quickly shift to become an emergency that requires external support. For engine room fires, such as in this occurrence and in a number of incidents recently investigated by the TSB, the on-board response capacity is limited to boundary cooling after the CO2 fixed fire suppression system has been used. Whenever outside resources are involved, a response plan is needed on the part of the responding authorities as well as the vessel in distress. In this occurrence, the emergency response involved many agencies and individuals, including the CCG, the Canadian Armed Forces, NFL management, the PEI Emergency Measures Organization, Island Emergency Medical Services, the RCMP (Royal Canadian Mounted Police), TC Marine Safety and Security staff, approximately 200 firefighters from PEI fire departments, and crews from various vessels of opportunity. Those who boarded the vessel while the response to the fire was ongoing included a rotation of firefighters, NFL staff, replacement NFL crew, and 2 TC Marine Safety and Security staff. This level of response was feasible because the vessel was beached on a sandbar close to Wood Islands terminal during daylight and in favourable weather. However, this level of support is often unavailable in an occurrence due to the location of the vessel, the environmental conditions, or the specialized nature of marine firefighting. In the later stages of the fire response, the vessel was at a perceived risk for an explosion. Furthermore, the water ingress negatively impacted stability, putting the lives of the
TRANSPORTATION SAFETY BOARD OF CANADA ■ 82 responders at risk. Capsizing would have put the environment of the Northumberland Strait at risk. Pre-arranged plans exist to support emergency responses for some sectors, vessels, and emergencies. However, Canada does not require pre-arranged plans for fire response or marine salvage, unlike the U.S. For passenger vessels, only vessels that make international voyages are required to provide information, such as SAR cooperation plans, as preparation for emergencies. In June 2023, the CSA 2001 was amended to give the Governor in Council the authority to make regulations, on the recommendation of the Minister, “respecting arrangements for emergency services, including requiring vessels or classes of vessels to enter into such arrangements.”159 However these regulations may take many years to put into place. Finding as to risk If Canada’s level of preparedness and coordination for marine emergencies, beyond the search and rescue regime, is not increased, there is a risk that these emergencies will not be managed in a timely and effective manner, endangering vessels, people on board, the environment, and the public. 2.3.1.1 Communications with the vessel in distress It is best practice to have methods of communication clearly defined in emergency procedures so that responders can focus on the emergency itself. This is true for both communication between teams on board the vessel and for communication with outside resources. In practice, communication between the leadership of the shore-based first responders, the shore management of the vessel, the master and crew, and the JRCC may not be well coordinated, especially at the initial stage of the response when resources are first being dispatched. In this occurrence, the shore-based response included NFL management, PEI paramedics, police, and approximately 200 firefighters from PEI fire departments. As these resources were dispatched by 911 operators, they did not all establish communications with the JRCC when they deployed. During the occurrence, some information was relayed between shore- based first responders and the JRCC by the marine-based responders. There was no communication plan to coordinate between all responders during the occurrence, and there was infrequent communication directly between the vessel and the JRCC. Following the occurrence, the shore-based responders also identified a need for a formal information plan and for improved information sharing.
159 Government of Canada, Canada Shipping Act, 2001 (as amended 22 June 2023), subsection 120, paragraph s.1.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 83
Finding as to risk When first responders do not have a communication plan for marine emergencies, information may be missed and decisions may be delayed, increasing the risks to those on board, to the vessel, and to the environment. When a marine emergency is detected, it is a best practice for the crew to notify a radio ship reporting station (in Canada, a Marine Communications and Traffic Services station) of a potential or immediate need for help using radio distress frequencies. This action signals that outside help may be needed. The reporting station can then give a JRCC or maritime rescue sub-centre (MRSC) early notice of a potential emergency so that the search and rescue coordinators can then notify appropriate resources and prepare for an effective response. As well, using radio for the initial call means nearby vessels that can potentially help are also alerted that help may be required. NFL emergency procedures emphasized that the master should contact shore staff directly, which he did, using a cell phone. The terminal manager in turn contacted 911, which then contacted JRCC Halifax. The Marine Communications and Traffic Services Sydney issued a Mayday relay broadcast message 12 minutes later. Once the emergency reached the point where the vessel was being abandoned, NFL procedures then instructed the master to issue a Mayday call, which he did. Finding as to risk If emergency response procedures do not instruct crew to make an early and direct report to a radio ship reporting station, there is a risk that assistance will be delayed.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 84 3.0 FINDINGS 3.1 Findings as to causes and contributing factors These are the factors that were found to have caused or contributed to the occurrence.
- For approximately a month after the initial leak in the fuel rail was observed, a series of
temporary repairs using non-standard materials and methods was made while the vessel remained in service.
- When the final temporary repair to the leaking fuel rail failed, fuel sprayed onto the hot
engine components and ignited.
- Water from a fire hose likely spread the burning engine fuel around the engine room
and contributed to the spread of the fire.
- An unlubricated component of the fuel valve assembly prevented the fuel valve from
closing fully, allowing the contents of the day tank to drain through the damaged fuel rail and fuel the fire in the engine room.
- The resistance felt when the carbon dioxide (CO2) release mechanism cable was pulled
provided a false indication that the CO2 had been released and there was no unambiguous, direct feedback from the remote-release mechanism to indicate success. As well, the posted guidance was not explicit. Consequently, the CO2 release was delayed, allowing the fire to grow.
- The engine room space was not completely sealed and air continued to enter the space
through open vents, likely displacing the released CO2 and also adding oxygen to the fire. Consequently, the fire continued to burn.
- The flexible connection between the cooling system and the forward main engine was
not protected against heat and fire. When the flexible connection was damaged by the fire, seawater from the vessel’s cooling system entered and began flooding the closed engine room. 3.2 Findings as to risk These are the factors in the occurrence that were found to pose a risk to the transportation system. These factors may or may not have been causal or contributing to the occurrence but could pose a risk in the future.
- If the hazards posed by temporary repairs to a vessel are not objectively assessed in
order to counter operational pressures, the practice of temporary repairs may be normalized. Consequently, risks may go unidentified or unmitigated, jeopardizing people on board and the vessel.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 85
- Once a vessel lists beyond its documented worst-case stability scenarios, the risk of
sudden capsizing becomes high, posing a risk to the lives of the people on board.
- If authorized representatives (ARs) do not ensure that procedures related to vessel
operation and safety are periodically evaluated and updated with feedback from those who use them, there is a risk that these procedures will not support an effective emergency response.
- If emergency procedures do not contain explicit, vessel-specific information that can be
used immediately, there is a risk that crew members will not have critical information needed to effectively set priorities and make decisions during an emergency.
- If a vessel’s safety management system does not include a decision process for the
period of the emergency response that follows a partial abandonment, decisions may be delayed or tasks may be missed, increasing the risk to people on board and to the safety of the vessel.
- If shipboard emergency drills do not represent realistic scenarios, there is a risk that
crews will be unable to respond effectively to an emergency.
- If a vessel’s muster list assigns crew members to duties in multiple emergency
procedures, then leadership and communication issues, delays, or other problems are likely to occur when the emergencies happen at the same time, increasing the risk to people on board, the vessel, and the environment.
- If there is no accurate count kept of passengers boarding a vessel, some passengers may
not be accounted for in an emergency, increasing risks to passengers, crew, and first responders.
- If a crew does not ensure that the number of lifejackets of the correct sizes is sufficient
for the number of children and infants boarding the vessel, there is a risk that children and infants will not have lifejackets in an emergency.
- If ARs do not have a clear understanding of the scope of their responsibilities with
respect to safety, vessels may operate without the minimum defences provided by meeting regulatory requirements, increasing the risk of incidents and accidents.
- Without effective oversight by an AR, practical drift can emerge in the execution of a
vessel’s operational and emergency procedures, and the safety objective of the Canada Shipping Act, 2001, may not be achieved. TRANSPORTATION SAFETY BOARD OF CANADA ■ 86
- If Canada’s level of preparedness and coordination for marine emergencies, beyond the
search and rescue regime, is not increased, there is a risk that these emergencies will not be managed in a timely and effective manner, endangering vessels, people on board, the environment, and the public.
- When first responders do not have a communication plan for marine emergencies,
information may be missed and decisions may be delayed, increasing the risks to those on board, to the vessel, and to the environment.
- If emergency response procedures do not instruct crew to make an early and direct
report to a radio ship reporting station, there is a risk that assistance will be delayed. 3.3 Other findings These findings resolve an issue of controversy, identify a mitigating circumstance, or acknowledge a noteworthy element of the occurrence.
- The need for fire protection on the flexible connections between the seawater cooling
system and the engine was not identified at the engine replacement planning stages or during post-installation and subsequent inspections.
- The louvre dampers on the air intake vents were being replaced with the same type of
damper, which is less effective at sealing vents than solid fire dampers.
- The marine evacuation systems installed on the vessel contributed to the safe and rapid
evacuation of passengers.
- Beaching the Holiday Island on a sandbar stabilized the vessel during the passenger
evacuation.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 87
- 0
SAFETY ACTION 4.1 Safety action taken 4.1.1 Transportation Safety Board of Canada On 05 May 2023, the TSB sent a Marine Safety Information Letter (MSI 03 23) to the Director General of Transport Canada (TC) Marine Safety and Security. In the letter, the TSB described installation of equipment that affected access to the manual release lever of at least 1 carbon dioxide pilot cartridge. On 26 May 2023, the Director of Product Management & Strategy at Kidde Fire Systems, who had been copied on the letter, stated that Kidde Fire Systems was reviewing the incident as part of its product safety process. During the analysis of the fire on the Holiday Island, gaps in data to assess the underlying factors were identified. This followed safety concerns in other recent investigations,160 where similar gaps in data were found. To more fully investigate the potential significant safety risks in the transportation system, the Board launched a safety issue investigation about vessel fires and response in Canada in April 2025. 4.1.2 Transport Canada 4.1.2.1 Transport Canada – Marine Safety and Security On 29 February 2024, TC included information from the TSB Marine Safety Information Letter in a ship safety bulletin (SSB 06/2024). 4.1.2.2 Transport Canada – Programs Group Maintenance report meetings with the operator (Northumberland Ferries Limited) are now monthly instead of quarterly. 4.1.3 Northumberland Ferries Limited Since the occurrence, Northumberland Ferries Limited (NFL) has undertaken an ongoing safety program and has completed the following actions: • The passenger services supervisor position has been added to the target audience for Specialized Passenger Safety Management (Ro-Ro Vessels) training. • NFL has implemented a new policy which must be followed by ships’ crew in the event of a leak on a fuel or pressurized oil system, including escalation to shore management and the classification society. • NFL has implemented policy which directs additional care and attention in the conduct of planned maintenance and testing of emergency fuel shut-off valves to ensure that the valves fully close.
160 TSB marine transportation safety investigations M21P0297, M21A0041, and M19C0403.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 88 • NFL has developed new policy that outlines the steps that must be taken by ships’ crew in the event of a defect that impacts, or has the potential to impact, vessel or personnel safety. This includes defects for which a temporary repair has been made. • Project work is ongoing to bolster existing procedures and checklists. Resources include the fleet captain, safety department, and an external plain language expert, as well as other operators’ best practices. • NFL has reviewed and updated emergency plans. NFL has acquired access to communication equipment that uses provincial communication systems (PICS2 [Provincial Integrated Communications System] Prince Edward Island/TMR [Trunk Mobile Radio] Nova Scotia, New Brunswick) and related training. The use of this technology is included in drills and training to increase familiarity and effectiveness during actual responses. • NFL has ensured that the on-scene commander and the incident command system (ICS) team practise emergency response scenarios. NFL has ensured that all emergency management staff have ICS training. • NFL has ensured that all bridge and appropriate terminal staff receive training and familiarization on the manifest report. • A series of firefighting scenarios have been developed for MV Confederation. This document includes 22 different scenarios and details on risks specific to each space. • Rewritten policy and procedures documents direct that the captain is to know what the count of total persons on board is, as well as the total number of passengers requiring assistance prior to each departure. This information must also be stored ashore. • NFL continues to work with local first responders, including the concept of unified command (incident command system) to ensure a seamless transfer of information leading to objective, collaborative decisions in the heat of the emergency. • Safe beaching and anchoring locations have been added to the voyage plan. • Counters are in place at all marine evacuation system stations. Evacuation team leaders and crew are instructed on their use, and the counters are used during drills. • The Shipboard Operations Manual has been updated and shipboard and terminal policies and procedures are more closely connected, based on lessons learned from this occurrence. • The muster lists for the new vessel are designed so that crew members can be reassigned as required. • The procedure for internal audits has been improved. • Improvements have been made to how crew qualifications are managed.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 89
- 2
Recommendation 4.2.1 Knowledge of the role and the scope of responsibilities of authorized representatives An authorized representative (AR) is the person161 who is responsible for acting with respect to all matters relating to the vessel that are not otherwise assigned to another person. The AR must keep up with changes in safety knowledge, standards, and regulations. Where matters are assigned by regulation to another role, such as the master, the AR remains responsible for oversight of those matters. By default, the AR is an owner of the vessel. However, a vessel owner can delegate this role to a qualified person. The owner remains responsible for the acts and omissions of their AR. The role of a vessel’s AR is described in sections 14 and 106 of the Canada Shipping Act, 2001 (CSA 2001). Specific duties are defined in the more than 30 regulations made under the act that refer to the AR. Understanding and keeping up with such a broad scope of responsibility can be a challenging and difficult task; ARs or their delegates may be experts in their own operations but are not typically experts in interpreting numerous, complex regulations that may exist in multiple versions and that may have differing application criteria. The current definition of the role of the AR provides a clear path for oversight and enforcement. TC states that “the oversight regime is based on the legal responsibility of the AR to comply with regulations as stated under the CSA, 2001.” However, in addition to ensuring regulatory compliance, the AR or the AR’s delegate plays a proactive role in ensuring safety. Consequently, it is critical that they understand the scope of their role. Recent TSB investigations,162 articles in industry publications, and other information for vessel owners suggest that not all vessel owners and ARs understand the scope of the responsibility that TC assigns to ARs. Even for larger vessels, the role of AR may still be perceived as an administrative contact.163 TC is responsible for administering the CSA 2001 and more than 40 associated regulations, most of which have the potential to apply to the role of AR. The regulations cover many topics and have been written over a period of decades. Accordingly, definitions can differ between regulations or the style of writing may change, making it very complex for ARs to access and comprehend their specific requirements.
161 Under Canadian law, a corporation is a separate legal person for the purposes of liability; thus, authorized representatives can be corporations. 162 TSB marine transportation safety investigations M22P0259, M20P0230, M20P0229, M18P0014, M16C0036, and M10F0003. 163 For example, see S. Chapelski, “Canadian Maritime Law: Increased Penalties and Responsibilities for Authorized Representatives of Vessels,” Norton Rose Fulbright (25 October 2023), at https://www.nortonrosefulbright.com/en/knowledge/publications/0dcf3bc6/canadian-maritime-law- increased-penalties-and-responsibilities (last accessed on 13 June 2025).
TRANSPORTATION SAFETY BOARD OF CANADA ■ 90 TC communicates with the marine community via ship safety bulletins and maintains a distribution list where members can subscribe to receive updates, for example to technical publications (TPs). These publications and bulletins explain the responsibilities of the AR or related roles with respect to individual regulations or topics of interest. However, some ARs may not be aware of the availability of these safety documents. Recognizing the complexity of the regulatory regime, TC also has voluntary programs for some vessel owners. These programs provide training and information, although they may not name ARs explicitly. For example, the Small Vessel Compliance Program (for vessels under 15 gross tonnage [GT], including tugs and fishing vessels) is described as “an easy-to- use tool that brings together all requirements for small non-pleasure vessels”164 to help vessel owners understand the scope of their responsibilities. For larger vessels, ARs are likely to be supported by an organization with access to more resources. TC expects the AR to understand the role – that is, to take proactive measures to learn which regulations apply to their vessel and how to follow them. However, as this investigation and many others demonstrate, the role of AR is not clearly understood across many parts of the industry. If ARs do not have a clear understanding of the scope of their responsibilities with respect to safety, vessels may operate without the minimum defences provided by meeting regulatory requirements, increasing the risk of incidents and accidents. For this reason, the Board recommends that the Department of Transport provide comprehensive guidance for authorized representatives, outlining the full scope of their responsibilities. This guidance should support authorized representatives in understanding and complying with applicable regulations, thereby reducing the risk of vessels and crews operating without the minimum safety defences afforded by regulatory compliance.
TSB Recommendation M25-01 This report concludes the Transportation Safety Board of Canada’s investigation into this occurrence. The Board authorized the release of this report on 04 June 2025. It was officially released on 23 July 2025. Visit the Transportation Safety Board of Canada’s website (www.tsb.gc.ca) for information about the TSB and its products and services. You will also find the Watchlist, which identifies the key safety issues that need to be addressed to make Canada’s transportation system even safer. In each case, the TSB has found that actions taken to date are inadequate, and that industry and regulators need to take additional concrete measures to eliminate the risks.
164 Transport Canada, “Small Vessel Compliance Program,” at https://tc.canada.ca/en/programs/small-vessel- compliance-program (last accessed on 13 June 2025).
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 91
APPENDICES Appendix A – General layout of the Holiday Island Figure A1. General layout of the Holiday Island (Source: Lengkeek Vessel Engineering Inc., with TSB annotations)
TRANSPORTATION SAFETY BOARD OF CANADA ■ 92 Appendix B – TSB laboratory analysis of the fuel rail repair Post-occurrence, the fuel rail repair was observed to be damaged (Figure B1). Figure B1. The location of the fuel rail repair on the forward main engine between cylinders B5 and B6 (Source: TSB)
A series of tests were conducted at the TSB laboratory to determine • the effects of marine gas oil (MGO) on the hose used in the repair; • the effects of normal fuel line operating pressures on a simulated pipe repair; • the effects of worm drive tightening torque on hose clamp performance; and • the spray pattern of a fuel leak under simulated conditions. The results can be summarized as follows: • Although there was some swelling near the ends of the test sample, prolonged exposure to MGO alone is not believed to have caused the repair to fail. • The installation of worm drive hose clamps can cause considerable variation on the efficacy of the seal. • Due to the design of worm drive clamps, it is possible for them to appear adequately torqued but not be torqued enough to provide a good seal. As well, adding an additional clamp, if not properly torqued, does not improve the sealing.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 93
• Immediately next to the clamped hose, a fuel spray was observed to be in a ring-like pattern vertically around the repair location and horizontally sprayed at least 54” from the simulated repair (Figure B2). Figure B2. Fuel spray test results in 2 dimensions. Note that the spray would be in 3 dimensions, and that spray near an engine may reflect or drip onto nearby surfaces. (Source: TSB) The TSB laboratory concluded that with the combination of line pressure, exposure to fuel, engine room heat, engine vibration, and a marginally torqued clamp, a sudden leak could have developed.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 94 Appendix C – Scope of responsibilities of the authorized representative For Canadian vessels, subsection s14(1) of the Canada Shipping Act, 2001 (CSA 2001) states that the authorized representative (AR) “is responsible under this Act for acting with respect to all matters that are not otherwise assigned by this Act to any other person.”165 Even where another person is named, the AR is responsible for oversight of that person. Some regulations also begin with a statement such as the following: “the authorized representative of a vessel must ensure that requirements of these regulations are met in respect of the vessel.”166 Of the 49 regulations made pursuant to the CSA 2001, at least 31 have the potential to apply to AR role. At the time of the occurrence, certain regulations were applicable under the Canada Shipping Act (R.S.C. 1985) and not the CSA 2001; as of 20 December 2023, those regulations were replaced by the Vessel Construction and Equipment Regulations (SOR/2023-257). These regulations apply to new vessels and may not apply to older vessels such as the Holiday Island. Depending on the regulations that apply to an older vessel, the AR may need to consult regulations that have since been repealed. Some regulations mention the AR explicitly as being responsible for certain requirements. Others name the master or owner as responsible for or as sharing responsibility for similar items in the regulations. Section 4 of the Administrative Monetary Penalties and Notices (CSA 2001) Regulations167 gives details about how to serve a document on a vessel to individual or corporate ARs. Section 4 of the Arctic Shipping Safety and Pollution Prevention Regulations168 distinguishes between “requirements,” which the AR must ensure are met, and “operational requirements,” which the master must ensure are met. In the Ballast Water Regulations, the role of the AR is extended to the “owner and operator”169 of a pleasure craft that is not a Canadian vessel. Section 4 of the regulations specifies that the “authorized representative and the master of a vessel must ensure that the requirements”170 of certain sections are met and defines the period of responsibility for each role with respect to the ballast water record book.
165 Government of Canada, Canada Shipping Act, 2001 (S.C. 2001, c. 26, as amended 22 June 2023), subsection 14(1). 166 For example, see the Navigation Safety Regulations or the Vessel Safety Certificates Regulations. 167 Transport Canada, SOR/2008-97, Administrative Monetary Penalties and Notices (CSA 2001) Regulations (as amended 10 April 2024). 168 Transport Canada, SOR/2017-286, Arctic Shipping Safety and Pollution Prevention Regulations (as amended 07 June 2023). 169 Transport Canada, SOR/2021-120, Ballast Water Regulations (as amended 16 April 2024), subsection 1(2). 170 Ibid., section 4.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 95
The Cargo, Fumigation and Tackle Regulations add that a company, “in respect of a Canadian vessel, means its authorized representative.”171 These regulations also assign some responsibilities to the “authorized representative and the master” of a vessel (for example, subsections 102[2] and 115[2]), the AR or the master (for example, subsection 146[3]), or divide the responsibilities between the 2 roles (for example, section 218). Section 4, Compliance, of the Collision Regulations lists the AR and master together. Rule 2: Responsibility, lists “any vessel, or the owner, master or crew thereof.”172 The Fishing Vessel Safety Regulations state that “unless otherwise indicated in this Part [Part 0.1: Interpretation], the authorized representative and the master of a fishing vessel shall ensure that the requirements of this Part are met.”173 The specific requirements are directed to the AR. The Load Line Regulations (SOR/207-99) and the Vessel Registration and Tonnage Regulations (SOR/207-126) contain numerous mentions of AR responsibilities, which vary according to factors such as the age and voyage type of the vessel and whether the vessel is “maintained in accordance with the requirements of a classification society.”174 The Long-Range Identification and Tracking of Vessels Regulations (SOR/2010-227) name the vessel’s master in subsection 11(2). Compliance with sections 4 to 10 is the responsibility of the AR. In the Marine Personnel Regulations (SOR/2007-115), most references to the AR are used as an alternative to the employer. The Navigation Safety Regulations, 2020 (SOR/2020-216) contain references to the AR unless “otherwise provided.”175 These regulations and the Vessel Safety Certificates Regulations (SOR/2021-135) also contain references to the AR and/or the master being responsible for meeting requirements or ensuring that requirements are met. The Small Vessel Regulations (SOR/2010-91) state that “owner, in respect of a vessel other than a pleasure craft, means the authorized representative as defined in section 2 of the Act.”176 Specific requirements are assigned to the owner and/or the operator. The Vessel Detention Orders Review Regulations (SOR/2007-127) refer to the AR.
171 Transport Canada, SOR/20017-128, Cargo, Fumigation and Tackle Regulations (as amended 31 October 2021), paragraph 100(1)(a). 172 Transport Canada, C.R.C. c. 1416, Collision Regulations (as amended 06 June 2023), Schedule 1, Rule 2: Responsibility, paragraph (a). 173 Transport Canada, C.R.C. c. 1486, Fishing Vessel Safety Regulations (as amended 20 December 2023), section 3.02. 174 Transport Canada, SOR/2007-99, Load Line Regulations (as amended 20 December 2023), subsection 5(1)(b). 175 Transport Canada, SOR/2020-216, Navigation Safety Regulations (as amended 20 December 2023), section 4. 176 Transport Canada, SOR/2010-91, Small Vessel Regulations (as amended 20 December 2023), subsection 1(1).
TRANSPORTATION SAFETY BOARD OF CANADA ■ 96 The Vessel Pollution and Dangerous Chemicals Regulations (SOR/2012-69) refer to the AR of a vessel in many individual requirements. The Vessel Fire Safety Regulations refer to the AR and the master in different sections. For example, section 103 states If a vessel that is not a Safety Convention vessel and that was constructed before the day on which this section comes into force held, at any time before that day, a certificate issued under the Vessel Certificates Regulations or under section 318 or 319 of the Canada Shipping Act, R.S.C., 1985, c. S-9, its authorized representative may ensure that the requirements with respect to structural fire protection and fire safety systems and equipment that would have been required under the Act to be met, on the day before that day, are met instead of the requirements referred to in section 102 of these Regulations with respect to structural fire protection and fire safety systems and equipment.177 Other regulations made under the CSA 2001 are listed below. Those flagged with an asterisk were made under the original Canada Shipping Act (R.S.C. 1985). While these regulations were transferred to the CSA 2001, interpretation may require reviewing definitions or context from the preceding Canada Shipping Act. • Cross-border Movement of Hazardous Waste and Hazardous Recyclable Material Regulations (SOR/2021-25) • Fire and Boat Drills Regulations (SOR/2010-83) • Home-Trade, Inland and Minor Waters Voyages Regulations (C.R.C., c. 1430) • Hull Construction Regulations (C.R.C., c. 1431) • Large Fishing Vessel Inspection Regulations (C.R.C., c. 1435) • Life Saving Equipment Regulations (C.R.C., c. 1436) • Marine Machinery Regulations (SOR/90-264)* • Minor Waters Order (C.R.C., c. 1448) (defines minor waters only; does not contain any requirements) • Private Buoy Regulations (SOR/99-335)* • Response Organizations Regulations (SOR/95-405)* • Safe Working Practices Regulations (C.R.C., c. 1467)* • Safety Management Regulations (SOR/98-348)* • Ship Radio Inspection Fees Regulations (C.R.C., c. 1472)* • Shipping Casualties Reporting Regulations (SOR/85-514)* • Special-purpose Vessels Regulations (SOR/2008-121) • Tackle Regulations (C.R.C., c. 1494) For reference in the original Canada Shipping Act (R.S.C. 1985), there are 24 mentions of the AR in the sections related to registration and marking of a vessel.
177 Transport Canada, SOR/2017-14, Vessel Fire Safety Regulations (as amended 23 November 2022), section 103.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 97
9 (1) Every Canadian ship, other than a pleasure craft, must have a person who is responsible for acting with respect to all matters relating to the ship and who is to be known as the authorized representative.178 There are 109 mentions of the AR in the CSA 2001. 14 (1) Every Canadian vessel must have a person — the authorized representative — who is responsible under this Act for acting with respect to all matters relating to the vessel that are not otherwise assigned by this Act to any other person.179
178 Government of Canada, Canada Shipping Act (R.S.C., 1985, c. S-9), subsection 9(1). 179 Government of Canada, Canada Shipping Act, 2001 (S.C. 2001, c. 26) (as amended 22 June 2023), subsection 14(1).
TRANSPORTATION SAFETY BOARD OF CANADA ■ 98 Appendix D – Emergency duties for fire and preparation for abandoning ship Table D1. Summary of the Northumberland Ferries Limited muster list showing emergency duties for fire and preparation for abandoning ship (Source: Northumberland Ferries Limited; adaptation by the TSB) Position Fire and prepare to abandon ship Abandon ship Master In command. In command. Disembarks in port raft. Chief officer
In charge at scene of fire. Carries portable radio. TEAM LEADER In charge of launching port marine evacuation system (MES). TEAM LEADER Second officer
On bridge, assists master. Principal communicator. Carries portable radio for abandon ship. In charge of launching starboard MES. TEAM LEADER Chief engineer In charge of engine room. TEAM LEADER In charge of engine room. Goes in starboard raft. TEAM LEADER Second engineer At scene of fire. In charge of fire team 2 (deck). Prepares to launch starboard rescue boat and assists launching starboard life rafts. Fourth engineer In engine room; assists chief engineer. Prepares to launch port rescue boat and assists launching port life rafts. Assistant engineer Takes breathing apparatus (BA) to scene of fire. Part of fire team 1 (engine room). Prepares to launch port MES. First down in port life raft. Assists at bottom of slide. Quartermaster Assists master on bridge. Coxswain of starboard rescue boat. Bosun At scene of fire. Organizes fire teams until chief officer arrives. In charge of fire team 1 (engine room). Coxswain of port rescue boat. Deckhand 1 Takes BA to scene of fire. Part of fire team 1 (engine room). Part of starboard rescue boat crew. Deckhand 2 Takes BA to scene of fire. Part of fire team 2 (deck). Part of port rescue boat crew. Deckhand 3 Takes BA to scene of fire. Part of fire team 2 (deck). Prepares to launch starboard MES. First down in starboard raft. Assists at bottom of slide. Deckhand 4 Closes all vents and dampers in area of fire. When completed, reports this to the bridge. In preparation for abandon ship, sweeps vehicle decks for passengers. Prepares to launch port MES. Second down in port raft. Assists at bottom of slide. Deckhand/steward Sweeps vehicle decks for passengers. Assists mustering passengers. Prepares to launch starboard MES. Second down in starboard raft. Assists at bottom of slide.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 99
Position Fire and prepare to abandon ship Abandon ship Passenger services supervisor
In charge of mustering passengers. Carries portable radio. TEAM LEADER Prepares to launch starboard MES. Assigns assistance for passengers requiring assistance. Goes in starboard raft. Cook and/or galley steward, passenger services crew members 1, 2, 3, 4 Assists mustering passengers at pre- embarkation areas A and B and muster stations A and B. Prepares to launch port and starboard MES. Supernumeraries Assist passenger services supervisor. Prepare to launch port MES. Disembark as directed.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 100 Appendix E – Related occurrences Transportation Safety Board of Canada occurrences M22A0312 (Confederation) – On 04 September 2022, the passenger vessel Confederation, with 217 passengers on board, sustained a rudder failure and grounded while leaving Caribou, Nova Scotia. The number of passengers was not recorded prior to sailing and the master did not receive the official count of passengers until more than 1 hour after the occurrence began. M21P0297 (ZIM Kingston) – On 21 October 2021, the container vessel ZIM Kingston, with 21 crew members on board, experienced parametric rolling and lost 109 containers overboard while drifting south of Ucluelet, British Columbia (BC). A partial evacuation took place during the response to the subsequent fire. The TSB made findings related to comprehensive procedures, and emergency response. M21A0041 (Atlantic Destiny) – On 02 March 2021, the fishing vessel Atlantic Destiny, with 31 persons on board, sustained a catastrophic engine failure while the vessel was about 120 nautical miles south of Yarmouth, Nova Scotia. In this occurrence, 4 crew members and 2 search and rescue technicians remained on board for close to 5 hours after a partial crew evacuation. The TSB made findings related to safety culture (i.e., postponing maintenance tasks), emergency procedures, safety management systems (SMSs), and uncontrollable flooding due to fire damage. M20P0230 (Risco Warrior) – On 07 August 2020, while the tug Risco Warrior was holding the barge Western Carrier against the dock at Mellersh Point in Bute Inlet, BC, an explosion occurred in the tug’s battery compartment, located in the lazarette. The TSB made findings related to safety culture (i.e., normalized unsafe practices), authorized representative (AR) oversight, SMS, and hazard identification. M20P0229 (Arctic Fox II) – On 11 August 2020, the fishing vessel Arctic Fox II, with 3 crew members on board, reported taking on water. The crew abandoned the vessel approximately 77 nautical miles west-southwest of Bamfield, Vancouver Island, BC. The TSB made findings related to safety culture (i.e., perception of risk), and AR oversight. M19C0403 (Tecumseh) – On 15 December 2019, the bulk carrier Tecumseh had a fire in the engine room from a fuel hose failure while transiting the Detroit River off Windsor, Ontario. There were 16 crew members on board at the time. The vessel dropped both anchors and the fixed fire suppression system was used to extinguish the fire. The fire later reignited when oxygen was reintroduced into the space. The vessel had ongoing issues with leaks and failures in the fuel oil system. The TSB made findings related to vessel maintenance, emergency equipment operation, emergency procedures, drills, and SMSs. M19P0029 (Spirit of Sooke) – On 07 February 2019, the Royal Canadian Marine Search and Rescue vessel Spirit of Sooke was returning to its station after a training exercise when it ran aground on Christie Point in Sooke Harbour, BC. The TSB made findings related to
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 101
reporting incidents, emergency procedures, safety culture (i.e., normalized unsafe practices), and SMS. M18C0225 – (Akademik Ioffe) – On 24 August 2018, the passenger vessel Akademik Ioffe ran aground north-northwest of Kugaaruk, Nunavut. In this investigation, the TSB made findings related to reporting incidents, decision support systems, crew readiness, and post- occurrence contingencies. M18P0014 (MOL Prestige) – On 31 January 2018, a fire broke out in the engine room of the container vessel MOL Prestige while the vessel was at sea 146 nautical miles south- southwest of Haida Gwaii, BC. There were 22 crew and 1 supernumerary on board at the time. The fire was eventually extinguished. The TSB made findings related to safety culture (i.e., equipment adaptations), AR responsibility, emergency procedures, drills, and SMS. M17C0179 (Island Queen III) – On 08 August 2017, the passenger vessel Island Queen III, with 279 passengers on board, made bottom contact and flooded the steering compartment, off Kingston, Ontario. The TSB made findings related to familiarization with and quantities of life-saving equipment and the counting of passengers, SMS, drills, and emergency procedures. The investigation included 3 safety concerns: there was no requirement for infant lifejackets, passenger evacuation procedures were not assessed, and there was a gap in passenger safety management training for crew on sheltered waters voyages. M15C0045 (Frederike C-2) – On 28 April 2015, the fishing vessel Frederike C-2, with 4 people on board, had a fire in the engine room off Rimouski, Quebec, that caused the vessel to sink. The TSB made findings related to familiarity with firefighting equipment, emergency preparedness, distress reporting, repair reporting, and a fire alarm failure. M14A0051 (John I) – On 14 March 2014, the bulk carrier John I, with 23 crew on board, became disabled off the southwest coast of Newfoundland and Labrador due to flooding in the engine room. The vessel drifted before grounding the following day. The TSB made findings related to communications between the ship and the Canadian Coast Guard and the coordination of the emergency response. M14C0156 (La Relève II) – On 11 August 2014, the passenger vessel La Relève II, with 33 passengers on board, had a fire in the engine compartment off Havre Saint Pierre, Quebec. The TSB made findings related to emergency procedures, SMS, and Transport Canada (TC) oversight, including the applicability of the safe manning document to vessel operations. M13M0287 (Princess of Acadia) – On 07 November 2013, the roll-on/roll-off passenger ferry Princess of Acadia, which was carrying a total of 87 passengers and crew, sustained a main generator blackout and grounded while approaching the ferry terminal at Digby, Nova Scotia. The TSB made findings related to communications, emergency procedures, drills, SMS, TC oversight, and vessel maintenance. M13L0067 (Louis Jolliet) – On 16 May 2013, the passenger vessel Louis Jolliet ran aground off Île d'Orléans, Quebec, with 57 passengers and 21 crew members aboard. The TSB made
TRANSPORTATION SAFETY BOARD OF CANADA ■ 102 findings related to emergency management training for crew, comprehensive documented procedures, and realistic drills for passenger safety management. The report also documented a discrepancy between the number of passengers on board and the number recorded in the vessel’s logbook. M12N0017 (Beaumont Hamel) – On 30 May 2012, the passenger ferry Beaumont Hamel experienced an electrical failure, resulting in loss of propulsion and steering while approaching Portugal Cove, Newfoundland and Labrador, and struck the wharf. The TSB made findings related to vessel maintenance and SMS. M10F0003 (Concordia) – On 17 February 2010, the sail training yacht Concordia was knocked down and capsized after encountering a squall off the coast of Brazil. All 64 crew, faculty, and students abandoned the vessel and transferred to life rafts. The TSB made findings related to AR oversight and emergency procedures. M06W0052 (Queen of the North) – On 22 March 2006, the passenger vessel Queen of the North, with 59 passengers on board, struck the northeast side of Gil Island, BC, and sank, resulting in 2 fatalities. The TSB made findings related to the counting of passengers, assessment of emergency procedures, and SMS. The Board issued 3 recommendations in this report, including a requirement to develop effective passenger accounting (M08-01), realistic exercises so that operators of passenger vessels can evaluate the preparedness of their crews (M08-02), and an extension of the requirement to carry voyage data recorders (M08-03). M08-01 and M08-02 were closed as fully satisfactory in 2010 and M08-03 was closed as fully satisfactory in 2012. M03N0050 (Joseph and Clara Smallwood) – On 12 May 2003, a fire was discovered on the vehicle deck of the roll-on/roll-off passenger ferry Joseph and Clara Smallwood 8 nautical miles from Port aux Basques, Newfoundland and Labrador. Upon arrival in port, local volunteer firefighters, under the supervision of the crew, helped fight the fire. The TSB made findings related to following procedures, crew training, familiarity with fire- extinguishing equipment, and communications during an emergency. M03W0073 (Queen of Surrey) – On 12 May 2003, while en route in clear and calm conditions from Horseshoe Bay, BC, to Langdale, BC, with 318 passengers and 137 vehicles on board, the Queen of Surrey suffered a diesel oil fire on its number 2 main engine due to a fuel pipe fracture spraying onto an exhaust manifold. The engine room was evacuated and sealed, and carbon dioxide (CO2) gas was released. A steel pressure gauge pipe had been replaced with a copper one. The unsuitable material remained unnoticed during a leak repair 2 days before the fire. The TSB made findings related to the removal of a heat shield, SMS, and oversight by TC and the classification society. International occurrences Australian Transportation Safety Bureau (Fitzroy Flyer) – On 29 March 2019, the catamaran ferry Fitzroy Flyer was on a scheduled trip when a fire alarm sounded and the crew suspected fire, near Fitzroy Island, Australia. After initial attempts to extinguish the
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M22A0258 ■ 103
fire using portable extinguishers, the master activated the fixed fire suppression system. The investigators made findings about the on-board response, including the fire response, the passenger evacuation, and the emergency communication.180 Danish Maritime Accident Investigation Board (World Calima) – On 15 November 2017, the World Calima sustained an engine room fire while delivering technicians to windfarm installations near Helgoland, Germany. The master attempted to release CO2 from the bridge but was unable to see or hear whether the CO2 mechanism had been activated. The mate activated the CO2 mechanism manually from the CO2 room. The fire was extinguished and the vessel was towed back to port. The Danish Maritime Accident Investigation Board’s report contained findings about the absence of any confirmation that the CO2 mechanism had been successfully activated and the need to improve guidance and information. Following the occurrence, the company installed a sound and visual system to show the crew when the fixed CO2 mechanism was activated on the bridge.181 United Kingdom Marine Accident Investigation Branch (Wight Sky) – On 26 August and 14 December 2018, the passenger ferry Wight Sky suffered 2 catastrophic engine failures, 1 resulting in a fire near the Isle of Wight, United Kingdom. The United Kingdom Marine Accident Investigation Branch’s investigation also looked at 3 other engine failures. The investigators made findings related to engine maintenance, the management of engine maintenance, oversight, and communication about repairs and non-conformities.182 United Kingdom Marine Accident Investigation Branch (Acro Avon) – On 18 August 2015, a fire started on the dredger Acro Avon 12 miles off the coast of Great Yarmouth, UK. In this occurrence, the initial repair attempt to a failed fuel pipe may have been rationalized through experience and positive attitude to prompt remedial action. Isolating the fuel system to perform the repair would have interrupted the loading programme.183
180 Australian Transport Safety Bureau, “Suspected engine room fire and passenger evacuation involving domestic commercial vessel Fitzroy Flyer, 13km ENE of Cairns, Queensland on 29 March 2019,” at https://www.atsb.gov.au/publications/investigation_reports/2019/mair/mo-2019-004 (last accessed 18 June 2025) 181 Danish Maritime Accident Investigation Board, “World Calima summary report on engine room fire” (15 November 2017), at https://safety4sea.com/wp-content/uploads/2018/02/DMAIB-WORLD-CALIMA- Summary-report-on-engine-room-fire-2018_02.pdf (last accessed 18 June 2025). 182 United Kingdom Marine Accident Investigation Branch, Accident Investigation Report No. 4/2022, “Report on the investigation of 2 catastrophic engine failures, 1 resulting in a fire, on board the ro-ro [roll-on/roll-off] passenger ferry Wight Sky at the entrance to Lymington River and before berthing at Lymington Pier on 26 August and 14 December 2018” (April 2022), at https://assets.publishing.service.gov.uk/media/6267cc85e90e071690c1b679/2022-4-WightSky-Report.pdf (last accessed 18 June 2025). 183 United Kingdom Marine Accident Investigation Branch, Accident Investigation Report No. 17/2016, “Report on the investigation of a fire in the engine room on the suction dredger Arco Avon,” (September 2016), at https://assets.publishing.service.gov.uk/media/57cd64fbe5274a34fb000010/MAIBInvReport17_2016.pdf (last accessed 18 June 2025).
TRANSPORTATION SAFETY BOARD OF CANADA ■ 104 United States National Transportation Safety Board (President Eisenhower) – On 28 April 2021, the containership President Eisenhower experienced an engine room fire southwest of Santa Barbara, California, USA. The crew fought the fire using fire hoses and a fixed water mist system, before using the engine room’s fixed carbon dioxide fire- extinguishing system. A pinhole leak in a main engine fuel line had been patched for about 2 months before new tubing could be procured. The effectiveness of the crew’s response to the fire was credited to their realistic scenario-based training.184
184 United States National Transportation Safety Board, MIR-22/15, “Engine Room Fire aboard Containership President Eisenhower,” (10 May 2022) at https://www.ntsb.gov/investigations/AccidentReports/Reports/MIR2215.pdf (last accessed 18 June 2025).
FD06120 | 2022_加拿大运输安全委员会_Holiday_Island渡轮机舱起火_M22A0258_火灾报告(英文).md
分类:06_境外及港澳台调查报告 | 年份:2022 | 地域: | 严重程度: | 场所: | 起火原因:燃气/爆炸 | 来源格式:md
1. 标题与报告编号
- 标题:Marine transportation safety investigation report — Holiday Island engine room fire
- 报告编号:M22A0258
2. 机构与发布日期
- 机构:Transportation Safety Board of Canada(TSB)
- 事故日期:2022 年 7 月 22 日
3. 事故摘要
- 日期/地点:2022 年 7 月 22 日;Wood Islands, Prince Edward Island(冲滩于航道西侧沙洲)
- 事件:滚装渡轮 Holiday Island 接近 Wood Islands 时 机舱火警响起。关闭引擎、燃油阀,船舶故意冲滩。船员无法就地扑救;CO₂ 释放延迟/不完全。乘客经海上撤离滑梯至救生筏;岸上清点约 236 人。船舶向左倾斜(约 10°),经破损冷却软管进水,宣告推定全损。
4. 原因 / 发现
- 根本原因:对泄漏燃油轨的一系列临时修理使用了非标准材料与方法,船舶仍在运营;最终修理失效,燃油喷到高温引擎部件并点燃。
- 其他:水管播散燃烧燃油助长火势;未润滑的燃油阀部件使日用柜排空并燃油火灾;船员误以缆线电阻指示 CO₂ 成功,空间未密封、通风口开启使 CO₂ 被置换并增氧;冷却软管"未做隔热防火保护"致海水灌入机舱;百叶阻尼器不如实心防火阀有效;乘客清点不准(报 182 vs 岸上 236)。
5. 安全行动
- TSB 建议 M25-01:交通运输部为授权代表提供全面职责指引以支持合规。
- 识别缺陷:应急响应与通信、乘客清点、AR 监管方面的政策/程序不足。TSB 仅提建议,未发强制纠正令。
FD06121 | 2023_加拿大_TSBC_M23C0104_Engine_Room_Fire_Bulk_Carrier_Cuyahoga_Lake_Erie_2023.pdf
分类:06_境外及港澳台调查报告 | 年份:2023 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
PROTECTED B X00X0000-ENG-EXTENSION REPORT TYPE DATE MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ENGINE ROOM FIRE Bulk carrier Cuyahoga Lake Erie Kingsville, Ontario 23 May 2023
TRANSPORTATION SAFETY BOARD OF CANADA ■ 2 ABOUT THIS INVESTIGATION REPORT This report is the result of an investigation into a class 3 occurrence. For more information, see the Policy on Occurrence Classification at www.tsb.gc.ca The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. TERMS OF USE Use in legal, disciplinary or other proceedings The Canadian Transportation Accident Investigation and Safety Board Act states the following: • 7(3) No finding of the Board shall be construed as assigning fault or determining civil or criminal liability. • 7(4) The findings of the Board are not binding on the parties to any legal, disciplinary or other proceedings. Therefore, the TSB’s investigations and the resulting reports are not created for use in the context of legal, disciplinary or other proceedings. Notify the TSB in writing if this investigation report is being used or might be used in such proceedings. Non-commercial reproduction Unless otherwise specified, you may reproduce this investigation report in whole or in part for non-commercial purposes, and in any format, without charge or further permission, provided you do the following: • Exercise due diligence in ensuring the accuracy of the materials reproduced. • Indicate the complete title of the materials reproduced and name the Transportation Safety Board of Canada as the author. • Indicate that the reproduction is a copy of the version available at [URL where original document is available]. Commercial reproduction Unless otherwise specified, you may not reproduce this investigation report, in whole or in part, for the purposes of commercial redistribution without prior written permission from the TSB. Materials under the copyright of another party Some of the content in this investigation report (notably images on which a source other than the TSB is named) is subject to the copyright of another party and is protected under the Copyright Act and international agreements. For information concerning copyright ownership and restrictions, please contact the TSB. Citation Transportation Safety Board of Canada, Marine Transportation Safety Investigation Report M23C0104 (released 27 August 2025). Transportation Safety Board of Canada 200 Promenade du Portage, 4th floor Gatineau QC K1A 1K8 819-994-3741; 1-800-387-3557 www.tsb.gc.ca communications@tsb.gc.ca © His Majesty the King in Right of Canada, as represented by the Transportation Safety Board of Canada, 2025 Marine transportation safety investigation report M23C0104 Cat. No. TU3-12/23-0104E-PDF ISBN 978-0-660-78331-4 This report is available on the website of the Transportation Safety Board of Canada at www.tsb.gc.ca Le présent rapport est également disponible en français.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 3
Table of contents 1.0 Factual information ................................................................................................. 5 1.1 Particulars of the vessel ........................................................................................................................... 5 1.2 Description of the vessel ......................................................................................................................... 6 1.3 History of the occurrence ........................................................................................................................ 8 1.4 Damage to the vessel .............................................................................................................................13 1.5 Environmental conditions .....................................................................................................................13 1.6 Personnel certification and experience ............................................................................................13 1.7 Vessel certification ...................................................................................................................................14 1.8 Operations and crew workload ...........................................................................................................14 1.8.1 Vessel operations .....................................................................................................................14 1.8.2 Deck operations ........................................................................................................................15 1.8.3 Engine room operations ........................................................................................................16 1.8.4 Shore operations ......................................................................................................................16 1.8.5 Operating environment .........................................................................................................16 1.9 Main engine ................................................................................................................................................18 1.9.1 Fuel system .................................................................................................................................18 1.9.2 Engine mounting arrangement ..........................................................................................23 1.9.3 Technical documentation updates ....................................................................................26 1.9.4 Spray protection for fuel systems ......................................................................................27 1.9.5 Exhaust system insulation condition and installation ................................................27 1.9.6 Remote control system ..........................................................................................................30 1.10 Engine room fires .....................................................................................................................................31 1.10.1 Fuel and heat .............................................................................................................................32 1.10.2 Effects of ventilation in a compartment fire ..................................................................32 1.10.3 Guidance on preventing engine room fires ..................................................................33 1.11 Fire protection in machinery spaces .................................................................................................34 1.11.1 Ventilation ...................................................................................................................................34 1.11.2 Portholes and fire doors ........................................................................................................34 1.11.3 Skylight hatch ............................................................................................................................34 1.11.4 Carbon dioxide fixed fire suppression systems ............................................................36 1.11.5 Water supply to the fire main line .....................................................................................44 1.12 Firefighting and fire control operations ..........................................................................................49 1.13 Human factors issues ..............................................................................................................................51 1.13.1 Sleep ..............................................................................................................................................51 1.13.2 Decision making and stress in emergency situations ..............................................52 1.14 Safety in marine operations .................................................................................................................52 1.14.1 Lower Lakes Towing safety management system .......................................................54 1.14.2 Lower Lakes Towing maintenance policies and procedures ...................................55 1.14.3 Marine emergency response plan .....................................................................................56 1.14.4 Firefighting equipment and training manual ................................................................56 1.14.5 Emergency drills .......................................................................................................................57 1.15 Marine Emergency Duties training ....................................................................................................58
TRANSPORTATION SAFETY BOARD OF CANADA ■ 4 1.16 Exemptions to mandatory safety requirements ...........................................................................59 1.17 Previous occurrences ..............................................................................................................................60 1.18 TSB Watchlist ..............................................................................................................................................60 1.19 TSB laboratory reports............................................................................................................................61 2.0 Analysis ................................................................................................................... 62 2.1 Causes of the engine room fire ..........................................................................................................62 2.1.1 Engine vibration and retaining clamps on the fuel injection lines .......................62 2.1.2 Fuel spray from loosened fuel injection line connection .........................................63 2.1.3 Installation of insulation to protect against fire...........................................................64 2.1.4 Engine room ventilation during fires ...............................................................................65 2.2 Fixed firefighting equipment maintenance and installation ...................................................66 2.2.1 Carbon dioxide fixed fire suppression systems ............................................................66 2.2.2 Emergency fire pump isolation valve ...............................................................................68 2.3 Emergency response and preparedness .........................................................................................69 2.3.1 Drills and procedures .............................................................................................................69 2.3.2 Firefighting personal protective equipment and training .......................................70 3.0 Findings ................................................................................................................... 73 3.1 Findings as to causes and contributing factors ............................................................................73 3.2 Findings as to risk .....................................................................................................................................73 3.3 Other findings ............................................................................................................................................74 4.0 Safety action ........................................................................................................... 75 4.1 Safety action taken ..................................................................................................................................75 4.1.1 Lower Lakes Towing Limited ...............................................................................................75 Appendices....................................................................................................................... 76 Appendix A – Manufacturer instructions for monthly inspections ...................................................76 Appendix B – Similar occurrences ..................................................................................................................78 Transportation Safety Board of Canada ..........................................................................................78 U.S. National Transportation Safety Board .....................................................................................78 Other international accident investigation boards ......................................................................79
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 5
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ENGINE ROOM FIRE Bulk carrier Cuyahoga Lake Erie Kingsville, Ontario 23 May 2023 The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. This report is not created for use in the context of legal, disciplinary or other proceedings. See the Terms of use on page 2. Masculine pronouns and position titles may be used to signify all genders to comply with the Canadian Transportation Accident Investigation and Safety Board Act (S.C. 1989, c. 3). Summary On 23 May 2023, the self-unloading bulk carrier Cuyahoga, with 20 people on board, experienced a fire in the engine room while proceeding north on Lake Erie off Kingsville, Ontario. The crew closed the quick-closing fuel valve for the main engine day tank and then attempted to use the vessel’s carbon dioxide fixed fire suppression system. The vessel anchored north of Pelee Island, Ontario, and the fire went out shortly after the main engine stopped. On 25 May 2023, the vessel was towed to Kingsville, Ontario. No injuries or pollution were reported. 1.0 FACTUAL INFORMATION 1.1 Particulars of the vessel Table 1. Particulars of the vessel Name of the vessel Cuyahoga International Maritime Organization number 5166392 Transport Canada official number 815560 Flag Canada Port of registry Port Dover, ON Type Self-unloading bulk carrier Gross tonnage 10532 Length 188.98 m Breadth 18.29 m Draft at time of occurrence Forward: 5.85 m / Aft: 5.88 m Built 1943, Lorain, Ohio, U.S.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 6 Propulsion One diesel engine of 2530 kW driving 1 controllable- pitch propeller Crew 20 Registered owner and authorized representative Lower Lakes Towing Ltd. Classification society / recognized organization Lloyd’s Register Issuing authority for International Safety Management certification American Bureau of Shipping 1.2 Description of the vessel The bulk carrier Cuyahoga (Figure 1) was built in 1943 in Ohio, U.S., by the American Ship Building Company. It was built as a steam-propelled vessel and was converted to diesel in
- The Cuyahoga had a steel hull, and its forward and aft superstructures were
separated by 8 cargo holds. Figure 1. The Cuyahoga, shortly after the fire (Source: TSB)
The main deck spanned nearly the entire length of the vessel. The spardeck, above the main deck, was the uppermost deck over the cargo holds. The tank top ran from the engine room along the lowest part of the unloading tunnel below the cargo holds to the forward structure. The forward structure contained cargo conveyor and elevator machinery between the tank top and main deck. At the main deck level, the forward structure contained crew accommodations, workshops, storerooms, and the electrical control room for the cargo machinery. Above the spardeck, 2 partial decks contained additional crew accommodations, stores, and the forward deck machinery. The bridge was in the pilot house at the top of the forward structure. The aft structure (Figure 2) contained the main machinery spaces, separated from the aft deckhouse and cargo hold by bulkheads and decks that were rated as A-class divisions. The engine room comprised 3 levels: the tank top, the working deck, and the main deck. The engine control room, electric bus board, and auxiliary machinery were located on the working deck.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 7
The vessel’s steering gear, diesel generator compartment, boiler room, workshops, and storage areas were located on the main deck. Fuel storage tanks for the main engine were located in the machinery spaces just forward of the main engine below the main deck. The engine and boiler rooms were protected by a carbon dioxide (CO2) fixed fire suppression system and the diesel generator compartment was protected by a similar, independent system. The vessel carried portable fire extinguishers, as required. Figure 2. Profile view of the aft structure of the Cuyahoga (Source: TSB, based on machinery arrangement drawings (Lower Lakes Towing Ltd.)) 1 CO2 room, 2 Skylight, 3 Vent, 4 Aft peak, 5 Main engine, 6 Tank top, 7 Water ballast, 8 Unloading tunnel (to cargo hold), 9 Fuel oil bunker, 10 Fuel oil day tank, 11 Cargo hold. The aft deckhouse, which was on the spardeck and above the vessel’s main machinery spaces, contained crew accommodations, the galley, and the mess. The engine and boiler room casings ran through the accommodations to the deckhouse top on the boat deck. The engine room casing had a steel skylight and the boiler room casing housed the machinery exhaust piping that led into the exhaust gas funnel. The engine and boiler rooms could be accessed through a door inside the accommodations in the aft deckhouse or through 2 doors outside the aft deckhouse on the spardeck. The skylight had an opening of approximately 2.4 m by 1.8 m. The opening was covered by a steel-hinged hatch that could be opened and closed by a power-operated winch mounted outside on the skylight next to the hatch opening. The remote control for the winch was in the engine room on the working deck. The emergency generator compartment, the cylinder room for the CO2 fixed fire suppression system, the fuel tank for the ship service generator, the life rafts, and a rescue boat were located on the boat deck.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 8 Conveyor belts on the tank top ran underneath the cargo holds between the forward and aft sections of the vessel to carry cargo forward to the elevator. The cargo was carried up to the boom by the elevator and discharged to shore. An unloading tunnel that ran along the vessel’s centre line gave the crew access to the conveyor belts and associated machinery for operation and maintenance. The vessel’s emergency fire pump was located approximately 2.4 m forward of the bulkhead that separated the engine room from the cargo hold on the tank top. The isolation valve on the discharge side of the pump was located in the boiler room on the main deck, aft of this bulkhead. There were 4 muster stations. These were located forward of the aft deckhouse on the boat deck, aft of the forward deckhouse on the forecastle deck, in the engine control room, and on the bridge. The firefighter outfits and self-contained breathing apparatuses (SCBAs) on the vessel were stored in lockers at the forward and aft deckhouse muster stations. One outfit and 1 SCBA with spare bottles were located in each locker. 1.3 History of the occurrence On 23 May 2023 at 1914,1 the Cuyahoga left Marblehead, Ohio, U.S., bound for Kingsville, Ontario (Figure 3), a voyage of approximately 4 hours. The vessel was loaded with 11 400 metric tonnes of granular A crushed stone.
1 All times are Eastern Daylight Time (Coordinated Universal Time minus 4 hours).
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 9
Figure 3. Area of the occurrence (Source of main image: Canadian Hydrographic Service chart 2123, with TSB annotations. Source of inset image: Google Maps) At 2000, the fourth engineer began his 4-hour watch in the engine room. The chief engineer, second engineer, third engineer, and the master were in their cabins. The chief officer was the officer of the watch on the bridge along with the helmsperson and a deck officer cadet. At 2045, the chief engineer conducted a routine round of the engine room, then returned to his cabin to rest in preparation for cargo operations at Kingsville. At 2159, the fourth engineer was carrying out a routine round of the engine room. From the port side of the main deck, he observed that a fire had ignited on the top of the main engine between cylinders 7 and 8. He attempted to descend to the control room working deck to stop the main engine, but he could not reach it because of heat and flames from the rapidly expanding fire. The fourth engineer left the engine room through the access door in the aft accommodations and notified the chief engineer of the fire. He then activated the general alarm from a pull station outside the engine room and called the officer of the watch on the bridge to inform them of the fire location. The master heard the general alarm and immediately went to the bridge. At 2201, the master arrived on the bridge and observed flames and smoke coming from the engine room’s open skylight hatch. He relieved the chief officer and ordered him to proceed to the forward muster station. The helmsperson and the deck officer cadet remained on the bridge with the master. At approximately 2203, the chief officer arrived at his muster
TRANSPORTATION SAFETY BOARD OF CANADA ■ 10 station at the forward deckhouse and reported that all crew who were required to be at this muster station were present. At the same time, crew members were reporting to the muster station at the aft deckhouse. They began closing the machinery space ventilation openings and preparing fire hoses for use. A deckhand at the forward muster station and the general-purpose crew member at the aft muster station began donning firefighter outfits and SCBAs. At 2204, the third engineer started the emergency generator and connected it to the emergency bus, ensuring that emergency lighting and essential machinery, such as the emergency fire pump, steering gear, and controllable-pitch propeller, would continue to function. At the same time, the chief engineer stopped the engine room fans. At 2206, the master attempted to contact the second engineer, who was in charge of the aft muster station, on a portable very high frequency (VHF) radio. However, the second engineer was not at the muster station and there was no response. Consequently, the master ordered the chief officer to go aft to take charge of the aft muster station. At 2207, the master contacted Lower Lakes Towing Ltd. (LLT) and Marine Communications and Traffic Services Sarnia, informing them of the fire, and then made a Mayday call on very high frequency (VHF) channel 16. Canadian and U.S. Coast Guard vessels and aircraft and 2 cargo vessels were tasked through the Joint Rescue Coordination Centre in Trenton, Ontario, and the U.S. Coast Guard in Detroit, Michigan, U.S., and stood by ready to render assistance, if necessary. The chief engineer, who was unable to reach his muster station in the engine control room because of the fire, went to the boat deck and attempted to reach the skylight hatch to close it. He observed that the winch’s electric motor was running, and the skylight hatch was opening wider. When he heard the master’s attempt to contact the second engineer by radio, he became aware that the second engineer was absent. The chief engineer then re- entered the aft deckhouse accommodations on the port side to search for the second engineer, but he encountered heavy smoke and abandoned the attempt. At 2208, the third engineer reported to the aft muster station, where he found that the second engineer was absent. He then entered the aft deckhouse on the starboard side and went to the second engineer’s cabin, where he found the second engineer still asleep and woke him. The 2 engineers then escaped the accommodations area. Soon after, the chief officer reported to the master that all crew aft had been accounted for. At approximately 2209, concerned that the fire would cause an explosion, the master ordered all crew not involved in fire containment to move to the forward muster station, including the crew member from the aft muster station wearing a firefighter outfit. The chief engineer, second engineer, third engineer, and fourth engineer remained aft. Following an order from the chief engineer, the second engineer activated the quick-closing fuel valves for the main engine and ship service generators, which were located behind the emergency generator compartment on the boat deck of the aft deckhouse. The chief
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 11
engineer then started the emergency fire pump from the emergency generator compartment. Soon after, the chief engineer reported to the master that they were still unable to close the skylight hatch and the engine room vents behind the skylight to finish sealing the engine room. The heat and smoke coming from the opening prevented them from approaching the winch. Nevertheless, although the room had not been fully sealed, the master ordered the chief engineer to activate the engine room CO2 fixed fire suppression system to put out the fire. At 2211, despite the presence of smoke, the chief engineer entered the aft deckhouse, intending to activate the CO2 fixed fire suppression system by pulling the release cables at the remote operating station outside the access door to the engine room. When the chief engineer pulled the remote release cables, approximately 3 to 4 m of cable came out of the conduits. The chief engineer did not feel any resistance in the wire when he pulled. At 2212, the chief engineer reported to the master that the remote release cables for the CO2 fixed fire suppression system had failed. At approximately 2214, the fourth engineer succeeded in manually closing the skylight hatch and engine room vents and reported this to the chief engineer, who relayed this information to the master. After a brief discussion, the master then ordered the chief engineer to attempt to activate the CO2 fixed fire suppression system locally at the CO2 cylinder room on the boat deck. At 2215, the chief engineer entered the CO2 cylinder room accompanied by another crew member. He began the sequence to trigger the release of CO2 into the engine room by pulling the manual operating levers on the control heads of the 2 cylinders closest to the entry door. Almost immediately, the cylinder room flooded with CO2. The chief engineer and the crew member were forced to evacuate the room and closed the door behind them. At the same time, the master ordered the 2 crew members who had donned firefighter outfits and SCBAs and who were at the forward muster station to go aft to assist the engine room crew. At 2216, the master ordered the wheelsman to steer hard to starboard so that the easterly wind would blow the smoke aft and away from the life raft stations, and then to reduce the propeller pitch to zero. He ordered the second officer to drop the forward anchors when the vessel stopped. At 2217, the crew remaining at the forward muster station began to drop the forward anchors. At 2218, the chief engineer reported to the master that the 2nd attempt to activate the CO2 fixed fire suppression system had failed and that he could not confirm that CO2 had been released into the engine room.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 12 At 2221, the chief engineer reported to the master that there was no water available in the fire main, even though the emergency fire pump had been confirmed to be running. At 2222, the master ordered the crew to launch the life rafts and rescue boat and to stand by to abandon the vessel. Soon after, the starboard life rafts on the forward and aft deckhouses were deployed by the second officer and chief officer. At 2224, the chief officer reported that the port life raft and the rescue boat on the boat deck were inaccessible due to smoke but the crew continued to try to reach them. By 2230, the chief officer reported that all 3 life rafts and the rescue boat had been successfully launched. The master ordered the crew to pull the life rafts to the vessel’s midship section and deploy the embarkation ladders. At 2231, the chief engineer reported to the master that he had observed a reduction of smoke coming from around the skylight hatch and surrounding steel structure. He told the master that he believed that the CO2 was taking effect. The master ordered the crew to ensure that the engine room remained sealed. At 2244, the chief engineer returned to his cabin to retrieve an infrared thermometer so that the crew could begin monitoring boundary temperatures on the aft structure. At 2316, the chief engineer and a cargo maintenance crew member entered the unloading tunnel from the forward end of the vessel. They proceeded aft to troubleshoot the emergency fire pump. The chief officer remained at the opening of the emergency escape hatch on the spardeck to relay communications between the chief engineer and master, because the steel structure impeded radio transmissions. Believing that the fire pump was airlocked, the chief engineer attempted to drain air from the pump casing and discharge pipe through valves installed for this purpose. He observed what was considered a normal pressure on the discharge pressure gauge. Having confirmed that the pump was not airlocked, he was unable to do more to rectify the lack of flow to the fire main and he and the other crew member left the unloading tunnel. By 2328, no more smoke was observed coming from the skylight hatch and surrounding structure. On 24 May at 0147, 8 crew members who were not required to remain on the vessel to maintain control of the fire were evacuated to the Canadian Coast Guard Auxiliary vessel Colchester Guardian and brought to Kingsville. At 1002, LLT advised Marine Communications and Traffic Services Sarnia that they had contacted McKeil Marine Ltd. for tug assistance and T&T Marine Salvage Inc. for assistance with the fire.2
2 Under the U.S. Oil or Hazardous Material Pollution Prevention Regulations, 33 CFR, Part 155.4035, paragraph (b)(2), vessels such as the Cuyahoga are required to prepare a marine firefighting pre-fire plan in accordance with the U.S. National Fire Protection Association, NFPA 1405, Guide for Land-Based Firefighters that Respond to Marine Vessel Fires. The plan must identify a marine firefighting resource provider that is
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 13
On the following day, at 1445, the tugs Ecosse and Stormont arrived on site and prepared to tow the Cuyahoga. At 2050, the vessel was secured alongside at Kingsville. A team from T&T Marine Salvage Inc. entered the engine room and confirmed that the fire had been extinguished. 1.4 Damage to the vessel The Cuyahoga’s engine room and associated machinery sustained heat and smoke damage from the fire. The main engine and various electrical cables and equipment sustained moderate to severe fire damage. 1.5 Environmental conditions At the time of the occurrence, the sky was overcast and the visibility was about 25 nautical miles. The wind was from the east at 10 knots. The air temperature was 16 °C. 1.6 Personnel certification and experience The master held a Master Mariner certificate of competency that was first issued in 2017. He had been the master on the Cuyahoga since December 2020. He had graduated from a marine school in 2011 and had joined the company’s fleet in 2016. The master completed Marine Emergency Duties (MED) Advanced Firefighting training in 2011 and MED for Senior Officers training in 2013. He completed the Advanced Firefighting training refresher course in 2016. The chief officer held a Watchkeeping Mate certificate of competency but was exempted by Transport Canada from holding a Chief Mate, Near Coastal certificate of competency, which was otherwise required on board the Cuyahoga. He had worked on the vessel previously and had recently been promoted to chief officer. He graduated from a marine school in 2017 and had joined the company’s fleet in 2018. The chief officer had completed MED Advanced Firefighting training in 2017. The chief engineer held a Second-class Engineer, Motor Ship certificate of competency, which was first issued to him in 2016. He had been chief engineer on the Cuyahoga since
- He graduated from a marine school in 2005 and began sailing with the LLT fleet. The
chief engineer had completed MED Advanced Firefighting training in 2007 and MED for Senior Officers training in 2011. The fourth engineer had the sea time and required training but had not yet obtained a Fourth-Class Engineer, Motor Ship certificate of competency. He had taken all examinations except the oral examination.
under contract to respond as required. To comply with this regulatory requirement, Lower Lakes Towing Ltd. had contracted T&T Marine Salvage Inc.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 14 All 16 remaining crew members on the Cuyahoga held the required certificates for their positions on board. 1.7 Vessel certification The Cuyahoga held an inspection certificate for Near Coastal, Class 1 voyages, limited to trading in the Great Lakes and St. Lawrence River basin. The certificate was valid until 01 April 2028. The Cuyahoga was classed with Lloyd’s Register and inspected on behalf of Transport Canada by Lloyd’s Register under the Delegated Statutory Inspection Program (DSIP). The vessel’s safe manning document required the vessel to carry a minimum of complement of 1 master, 1 chief mate, 1 watchkeeping mate, 1 chief engineer, 1 watchkeeping engineer, 2 bridge watch ratings, and 4 additional ratings. Also, the document indicated that the vessel had a 2-watch arrangement. In this occurrence, the vessel met the requirements of the safe manning document. 1.8 Operations and crew workload 1.8.1 Vessel operations The Cuyahoga transported dry bulk commodities, such as coal, salt, grain, and crushed stone, typically between March and December.3 Outside of this navigation season, the vessel was placed into winter layup. Some of the crew remained on board for at least part of the layup period to carry out repairs to machinery, vessel structure, and cargo equipment and to supervise contractors. Class and statutory inspections were also normally carried out toward the end of this period. During the navigation season, Cuyahoga crew members operated in rotations of approximately 6 to 8 weeks. The vessel’s trading pattern followed a planned schedule between various ports on the Great Lakes. While the vessel was in transit, crew followed work/rest schedules to support essential maintenance and the inspection of equipment before cargo operations at port. Voyages were sometimes as short as 4 hours. While the vessel was alongside, cargo operations created additional tasks for the crew, such as loading and unloading freight, pumping ballast, shifting the vessel, and adjusting moorings. During this time, additional maintenance and inspections of machinery necessary for navigation were conducted regularly, as were navigation planning activities and the training and familiarization of new crew members. The result was a marked increase in the crew’s workload during these intensive periods, which invariably disrupted established work/rest schedules. Marine industry members acknowledge that more crew are needed when a vessel is operating in a complex environment, with frequent port calls or fast turnarounds in port,
3 After another serious fire (Marine Transportation Safety Occurrence M24F0001), the Cuyahoga was declared a total constructive loss.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 15
and that increased maintenance is needed for older vessels.4 Crew prioritize tasks that are immediately pressing, such as navigation tasks, repairs needed to maintain navigability, and cargo operations. Given that voyages between ports on the Great Lakes are often short, the time spent on mooring and cargo operations on these vessels is significantly higher than on deep-sea vessels. The tight operational schedule of the Cuyahoga left little, if any, time for crew to catch up on other tasks, such as routine inspections or documentation of maintenance work. On the vessel, the officers and crew communicated regularly, and senior officers communicated with shore staff as needed. 1.8.1.1 Sleep-related fatigue Sleep-related fatigue is widely reported in marine operations. Sleeping conditions on board bulk carriers like the Cuyahoga are not conducive to restorative sleep, given short turnarounds that interrupt sleep periods, noise and vibration from cargo machinery, and variable lighting conditions. The risk of sleep-related fatigue is increased by long shift durations, standby duties, and missed sleep opportunities during mandatory daytime rest periods. In acknowledgement of these operational challenges, the company has a fatigue policy, fatigue management training for employees, and fatigue management strategies. The TSB conducted a predictive analysis of the work and rest schedules5 for the days leading up to the occurrence. According to this analysis, although some fatigue was likely present, there was no evidence that fatigue unduly influenced crew performance. 1.8.2 Deck operations The deck crew navigated the vessel and operated deck machinery. They supervised the loading of cargo and operated the machinery to discharge the cargo. Deck crew inspected deck and cargo machinery, and safety equipment, including the fixed fire suppression systems, and kept records. The deck crew normally worked on a 3-watch arrangement (4 hours on, 8 hours off) plus overtime as required for mooring and cargo work. On the occurrence voyage, there was no third officer on board, so the chief officer and the second officer worked a 2-watch system (6 hours on, 6 hours off),6 plus overtime as required.
4 International Maritime Organization, MSC 109 /INF.3, Study on the Effective Implementation of the International Safety Management (ISM) Code (23 September 2024), p. 64. 5 TSB Guide to Investigating Sleep-Related Fatigue 2022: A Component of the TSB Operations Framework (unpublished). 6 Six hours on, 6 hours off shift work is recognized as contributing to fatigue; the amount of restorative sleep available in a 6-hour shift is much less than 6 hours, given the need to do personal things and the noise and other shipboard conditions. For this reason, 6 hours on, 6 hours off shifts are no longer a common industry practice.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 16 1.8.3 Engine room operations The engine room crew maintained the propulsion and other operational machinery, such as the conveyor belts and other machinery used to unload cargo. The engine room crew also kept records, both in the planned maintenance system for coordination with the technical shore staff and in various documents used on board for crew handovers for coordinating work among themselves. The engine room crew worked on a 3-watch arrangement (4 hours on, 8 off), plus an additional 2 to 3 hours of overtime on most days. At the time of the occurrence, the fourth engineer had not yet completed the requirements for his watchkeeping engineer licence and he was on watch with the chief engineer on call. 1.8.4 Shore operations Shore-based support for the Cuyahoga included a vessel manager and a designated person ,7 who worked together to coordinate technical and safety matters. The vessel manager oversaw the Cuyahoga and 2 other vessels. He was responsible for compliance, technical oversight, and maintenance planning and was a primary point of contact for emergencies. The chief engineer and the master worked closely with the vessel manager. The designated person provides a link between the company and those on board the 6 vessels owned by LLT. The primary functions of the designated person are to act as a primary contact for emergencies and to coordinate response, to monitor the safety and pollution prevention aspects of the operation of each vessel, and to ensure that adequate resources and shore-based support are provided. 1.8.5 Operating environment Marine shipping operates in an environment defined by a complex relationship between production and safety. Production includes delivering cargo on time and safety includes safe work practices.8 Given the hazards involved in production, companies must balance the need to produce against the need to operate safely by being aware of hazards and managing risks to levels as low as reasonably practicable. Cargo vessels transporting bulk materials on short voyages operate in a competitive environment with short-term pressures. TSB research has demonstrated that commercial success in a competitive environment results, in part, from operating at the edges of usual accepted practices.9 In other words, success depends on trading off financial efficiency, workload pressures, and safety, which may involve simplifying procedures, working faster,
7 The ISM Code requires a designated person (Part A, section 4). 8 J. Reason, Managing the Risks of Organizational Accidents (Routledge, 1997), pp. 4–5. 9 TSB Air Transportation Safety Issue Investigation A15H0001.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 17
or reducing costs. How these themes interact is represented in the operating envelope model (Figure 4). Figure 4. The operating envelope model (Source: TSB, adapted from S. Dekker, Foundations of Safety Science (2019), p. 254) The boundaries are • the economic failure boundary (beyond this boundary, the financial costs become unsustainable); • the unacceptable workload boundary (beyond this boundary, not enough time or resources are available); and • the safety boundary (beyond this boundary, there may be harm to workers, passengers, or the public). The marginal boundary delineates where the safety of an operation begins to break down. The safety margin is that part of the safe operating envelope between the marginal boundary and the safety boundary.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 18 In the model, the operating point represents the marine industry or individual operator and is constantly moving. The arrows inside the boundaries represent the competing pressures that push the organizational performance away from or toward a boundary. The adaptations made locally by individual workers, under the pressures of workload and financial constraints, are incremental and largely unseen by individuals. Left unchecked, organizational performance drifts toward the marginal boundary and eventually can cross over the safety boundary. As the operating point crosses the marginal boundary, the safety of the operation diminishes. When the operating point crosses the safety boundary, an accident or incident is increasingly likely to occur. 1.9 Main engine The Cuyahoga’s propulsion was provided by a Caterpillar 3608 DITA 8-cylinder in-line type, turbocharged, aftercooled diesel engine. The engine was coupled to a reduction gearbox via a flexible elastomeric coupling and a pneumatic clutch. The reduction gearbox drove the single propeller shaft and controllable-pitch propeller. Vibration is inherent in all diesel engines due to alternating combustion forces, torque reactions, movement of the unbalanced mass of rotating parts, clearance between parts due to manufacturing tolerances, and pressure pulses in fuel and exhaust piping. The Cuyahoga’s main engine systems showed the effects of excessive engine vibration. 1.9.1 Fuel system The engine operated on marine diesel oil. This fuel was supplied from the day tank forward of the engine. The fuel supply system consisted of fuel filters, a single engine-driven booster pump mounted on the engine, hard supply and return piping with threaded connections mounted on the engine, and a mechanical unit injector for each cylinder. Mechanical unit injectors may contribute to vibration more than electronic unit injectors. The fuel supplied to the injectors also provided cooling. Surplus fuel was returned to the day tank after having been cooled by a plate-type heat exchanger. The TSB calculated that at the maximum continuous rating, fuel pressurized to 550 kPa would flow to the injectors at a rate of approximately 37 L/min, and that surplus fuel would flow back to the day tank at 27 L/min at 350 kPa. The temperature in the return manifold after the injectors and before the cooler was approximately 91 ℃. The working level of the fuel in the day tank was lower than the engine-mounted fuel supply and return manifolds connected to the injectors. 1.9.1.1 Fuel injection lines and retaining clamps Fuel injection supply and return lines between manifolds and injectors were connected at the cylinder heads (Figure 5). The lines were ½-inch diameter steel tubes. The fuel injection
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 19
lines were comprised of −08 steel tube with a brazed steel flat end, a 13/16-16 UNC (unified national coarse) threaded connector, and an O-ring face seal (ORFS) fitting.10,11,12 Figure 5. Fuel injection supply and return lines showing positions of clamps, connectors, and fittings (Source: Manufacturer’s specifications with TSB annotations) ORFS fittings typically provide reliable leak-free connections. However, the tightening sequence and clamping force between the sealing faces of the fittings on the fuel injection lines are critical to ensuring adequate sealing against leaks, and the majority of leaks that do occur are due to loose fittings.13 Typical causes for loose fittings are14
10 International Organization for Standardization, ISO-8434-3:2005, Metallic tube connections for fluid power and general use — Part 3: O-ring face seal connectors (Edition 2, 2005). 11 International Organization for Standardization, ISO-6149-2:2006, Connections for hydraulic fluid power and general use — Ports and stud ends with ISO 261 metric threads and O-ring sealing — Part 2: Dimensions, design, test methods and requirements for heavy-duty (S series) stud ends (Edition 2, 2006). 12 SAE International, Hydraulic Tube Fittings Committee, SAE J1453-3, Specification for O-Ring Face Seal Connectors: Part 3 – Requirements, Dimensions, and Tests for Steel Unions, Bulkheads, Swivels, Braze Sleeves, Caps, and Connectors with SAE J1926-2 Inch Stud Ends (revised August 2009). 13 SAE International, Hydraulic Tube Fittings Committee, SAE J2593-202201, Information Report for the Installation of Fluid Conductors and Connectors (21 January 2022). 14 Ibid.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 20 • excessive strain caused by an incorrect tightening sequence; • improper use of tools; • failure to apply the specified torque;15 and • vibration. Manufacturers often supply general torque specifications for fittings based on type, size, and application. When the amount of torque is different for a particular application, it is specified in either a separate technical bulletin or in the disassembly/reassembly procedures for fittings. To reduce the effects of vibration on the fuel injection line fittings, retaining clamps secure the fuel injection lines to the cylinder heads, making the lines more rigid and reducing mechanical vibration in the fuel injection lines. The TSB found that the fuel injection return line for cylinder 7 was disconnected, which resulted in a spray of marine diesel oil. At the time of the occurrence, all the retaining clamps on the fuel injection lines were missing (figures 6 and 7). The investigation found that the retaining clamps were most likely removed in 2021, when the crew replaced the fuel supply and return manifolds.
15 Ibid.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 21
Figure 6. Cylinders 2, 3, and 4 on the main engine before the occurrence, with retaining clamps (enlarged) securing the fuel injection lines (Source: Lower Lakes Towing Ltd.) Figure 7. Main engine after the occurrence showing fuel injection lines with only bolts at the location for the retaining clamps (1 enlarged) (Source: TSB) The investigation could not determine whether the fuel injection lines had been replaced since the engine was installed in 2000; wear at the position of the retaining clamps indicated that the fuel injection lines had been in use with the clamps in place. 1.9.1.2 Fuel injection line maintenance Following the 2021 replacement of the fuel supply and return manifolds, several instances were recorded where the fuel injection line fittings had developed observable leaks (Table 2). Whenever leaks were observed, the crew removed the fuel injection lines to inspect and replace the O-rings, then reinstalled the lines. During the investigation, TSB laboratory personnel examined the no. 7 fuel injection return line that disconnected and determined that its connection would visibly leak when it was only finger-tight. Table 2. Fuel injection line and manifold issues and maintenance work documented in the engine room records Date Action 2020-04-28 The crew observed a crack on the main engine fuel supply manifold. They removed and temporarily repaired both the supply and return manifolds and ordered replacement
TRANSPORTATION SAFETY BOARD OF CANADA ■ 22 parts from the engine manufacturer. The cause of the crack was attributed to excessive vibration. 2021-01-24 Replacement fuel supply and return manifolds were received and the manifolds were replaced by the crew. The connecting points for the fuel injection lines likely shifted when the new manifolds were installed. To protect against the effects of vibration, pieces of welding blanket were inserted between the manifold pipes and the clamps that secured them. 2021-08-26 The crew observed a fuel leak on a fuel injection line on cylinder no. 2. The leak was repaired by tightening the fitting. 2021-10-23 The crew observed a fuel leak on a fuel injection line on cylinder no. 2. The leak was repaired by tightening the fitting. The crew retightened all the fuel injection line fittings as a precaution. 2021-10-25 The crew observed a fuel leak on a fuel injection line on cylinder no. 2. The leak was repaired by tightening the fitting. 2022-01-03 The crew observed that the fuel injection lines on cylinder no. 6 had been retightened to correct leaks on an unidentified date in December 2021. 2022-08-01 The crew observed a fuel leak on an injection line on cylinder no. 6. They removed all the fuel injection lines to investigate and then reinstalled them with new O-rings. 2023-04-16 The crew observed fuel leaks on the fuel injection lines on cylinder no. 7 and cylinder no. 8. They removed the fuel injection lines to investigate and then reinstalled them with new O-rings. 2023-05-05 The crew observed a fuel leak on a fuel injection line on cylinder no. 4. They removed the fuel injection lines to investigate and then reinstalled them with new O-rings. 2023-05-21 The crew observed a fuel leak on an injection line on cylinder no. 6. They removed the fuel injection lines on cylinder 6 to investigate and then reinstalled them with new O- rings. The crew then checked the torque of the fittings on all the remaining fuel injection lines, as a precaution. 1.9.1.3 Fuel injection line installation The location of the fuel injection line connections between the cylinder heads was difficult to access, both for installation and for in-service inspections and maintenance. During operation, surface temperatures of engine components ranged from 60 °C to 80 °C and touching these components required the use of gloves. To reach the connections, a crew member had to stand on a ladder, then reach up and fully extend their arms. This made it physically difficult to use the necessary tools and it was difficult for a crew member to see what they were doing. The fittings required the use of a crow’s foot attachment at the end of a ratchet extension that was approximately 30 cm long and connected to a torque wrench. The manufacturer’s installation and maintenance instructions state that a double hex flare nut crow’s foot attachment should be used (Figure 8, right) and that the full specified torque should be applied to each fitting in a single step. In this occurrence, the crew used the open-ended crow’s foot (Figure 8, left) attachment that they had on board the vessel, and torqued the fittings in multiple steps. Torquing bolts in a flange connection in multiple steps maintains relative positions during the process and ensures the gasket is sealed. For fittings such as the fuel injection line connections, torquing in multiple steps is unnecessary.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 23
- 9.2
Engine mounting arrangement The engine was secured to the bedplate via 4 mounts, with cast epoxy chocks separating each mount from the bedplate to retain the vertical alignment of the engine relative to the reduction gearbox. To ensure alignment is maintained, and to prevent relative movement between an engine mount and the bedplate, the chocks must maintain surface contact between the mount and bedplate. The forward mounts were secured to the bedplate by a fitted bolt and a bolt with a clearance fit. The fitted bolt controlled the horizontal angular alignment between the engine and gearbox; the bolt with a clearance fit provided the clamping force necessary to secure the engine in place. The aft mounts were secured to the bedplate by 2 clearance bolts. The manufacturer’s instructions indicate that insecure mounting causes increased levels of vibration, and that the levels will increase with higher engine loads. In 2020, the reduction gearbox was removed from the Cuyahoga’s engine room for repairs and reinstalled during the winter layup. The alignment between the engine and gearbox was outside of the maximum tolerance for vertical and angular misalignment specified by the manufacturer of the coupling. During the 2021 layup period, the engine was realigned to the gearbox to correct the misalignment. The engine’s epoxy chocks were repoured during the realignment. During the TSB examination of the mounting arrangement, cracks in 2 chocks were noted (figures 9, 10, and 11). The presence of oil and debris in the cracks indicated they predated the occurrence. Figure 8. Crow’s foot attachments. A double hex flare nut attachment (right) gives a better fit than an open-ended attachment (left) for applying the correct torque (Source: TSB)
TRANSPORTATION SAFETY BOARD OF CANADA ■ 24 Figure 9. Close-up photo of engine mounting, showing a crack on the forward port engine mount near the bolts (Source: TSB)
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 25
Figure 10. Close-up photo of engine mounting, showing a second crack on the forward port engine mount near the bolts (Source: TSB)
TRANSPORTATION SAFETY BOARD OF CANADA ■ 26 Figure 11. Close-up photo of engine mounting, showing a crack on the aft port engine mount near the bolts (Source: TSB) The Cuyahoga’s planned maintenance system generated a maintenance task after every 900 hours of engine operation that included a check of foundation bolt tightness. The task did not include any instructions for inspecting the engine mounts or epoxy chocks for damage, nor did it provide the torque for the bolts. When the task was last completed, on the day of the occurrence, the cracks in the epoxy chocks were not recorded. 1.9.3 Technical documentation updates The engine manufacturer makes updates to its technical documentation available for purchase via an annual subscription. In 1999, the manufacturer published a technical bulletin16 reminding users to use proper tooling and torque when servicing fuel injection lines on the 3600 series engine. The document listed the original torque of 45 newton- metres for the 13/16-16 size ORFS fitting. In 2020, the manufacturer updated its general torque specification for all of the ORFS fittings used on its products, increasing the torque for this size fitting to 65 newton-metres. Subsequently, the manufacturer consolidated references to the torque values into the general torque specifications. LLT received some of the manufacturer’s documentation updates from authorized service providers when these service providers were on the vessel performing maintenance on the
16 Caterpillar Inc., Use Proper Tooling and Torque When Servicing Fuel Injection Lines {1252, 1380} (SEB9278-00) (1999, revised 09 April 2019).
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 27
engine. LLT technical management staff were aware of the manufacturer’s paid subscription service but expected that authorized service providers would give the updates to LLT for free as they became available. At the time of the occurrence, the documentation on board the vessel comprised the original paper copies of the manual and technical bulletins that specified the original torque of 45 newton-metres.17 1.9.4 Spray protection for fuel systems The International Convention for the Safety of Life at Sea (SOLAS) requirements related to spray protection for fuel systems first came into effect in 1998 but were open to different interpretations. In 2003, the International Maritime Organization (IMO) issued a circular stating that all vessels were required to comply with the regulation by 01 July 2003 and clarifying the regulations as follows: Spray shields should be fitted around flanged joints, flanged bonnets and any other flanged or threaded connections in fuel oil piping systems under pressure exceeding 0.18 N/mm2 [newtons per square millimetre] which are located above or near units of high temperature, including boilers, steam pipes, exhaust manifolds, silencers or other equipment required to be insulated by SOLAS regulation II-2/15.2.10.18 In response, the manufacturer developed shields for fuel injection line fittings for installation at the manifolds and on the cylinder heads for its 3600 series engines. The manufacturer also recommended that class-approved metallic tape be used on all fuel and oil line connections. When the Cuyahoga’s engine was installed in 2000, shields for the fuel injection line fittings were not installed. At that time, the Canadian Marine Machinery Regulations19 applied and they did not require spray protection for fuel systems. 1.9.5 Exhaust system insulation condition and installation The Vessel Fire Safety Regulations incorporate SOLAS requirements by reference. SOLAS regulation 4 requires surfaces above 220 ℃ to be “properly insulated.”20 Associated SOLAS standards specify material performance requirements; there are no specific installation guidelines or requirements for crew or inspectors and “properly insulated” is not defined. Given that insulation is used in many industries, standards and practices from outside of the marine industry may also be applicable.
17 Caterpillar Inc., 3600 Diesel Service Pocket Guide (October 1999), p. 183. 18 International Maritime Organization, MSC/Circ.1083, Unified Interpretation of SOLAS [Safety of Life at Sea] Regulation II-2/15.2.11, in Force Before 1 July 2002 (13 June 2003). 19 Transport Canada, SOR/90-264, Marine Machinery Regulations (as amended 23 June 2021). The Vessel Construction and Equipment Regulations (SOR/2023-257) now require cargo vessels to comply with SOLAS requirements. 20 International Maritime Organization, International Convention for the Safety of Life at Sea (SOLAS), 1974, as amended 2016, Chapter II-2, Regulation 4, paragraph 2.2.6: Protection of high temperature surfaces.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 28 On the Cuyahoga, when the main engine was running at full load, exhaust gas temperature before entering the turbocharger was typically 520 ℃, and exhaust gas temperature after exiting the turbocharger was typically 350 ℃. The engine’s turbocharger was housed in an insulated metal casing. The bellows and the turbocharger connection were covered with removable insulation blankets. The inner insulating material was a composite of aluminized fibreglass and fibre wool made of calcium, magnesium, and silica that was held in place by a stainless-steel mesh. The outer surface was a silicone-impregnated fibreglass material that acts as a fluid barrier. The blankets were attached using lock wire that was wrapped over tabs riveted into the blanket. To ensure that insulation acts as an effective barrier, gaps and seams must be eliminated to the extent possible; if gaps or seams are present, they must face away from potential fluid sprays. During the TSB examination of the insulation (figures 12 and 13), the following was observed: • Notches were worn into the lower edge of the lagging covering the bellows where previously there had been support brackets. These notches formed openings that exposed the exhaust gas piping. • Gaps between sections of lagging and the insulation encased in sheet metal left piping exposed. • Flanges in the exhaust gas piping between the reducer, expansion bellows, and main piping section were uncovered. • Gaps were left for exhaust gas turbocharger temperature sensors. • The lagging over the opening in the turbocharger casing for the engine manifold piping was loose fitting. The TSB found no maintenance or inspection records or reported deficiencies related to the condition of the exhaust thermal insulation of the main engine turbocharger outlet pipe and expansion bellows. The sections of insulation covering the turbocharger outlet had been in use for several years, were occasionally removed and replaced during engine maintenance, and had deteriorated over time.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 29
Figure 12. Insulation on turbocharger showing gaps in the way the insulation had been installed on the turbocharger outlet from the side (Source: TSB)
TRANSPORTATION SAFETY BOARD OF CANADA ■ 30 Figure 13. Insulation on turbocharger showing a notch in the way the insulation had been installed on the turbocharger outlet (Source: TSB) 1.9.6 Remote control system The main engine speed and propeller pitch were controllable from the bridge using the engine control system. The system on the bridge included an emergency declutch button to disengage the propeller shaft from the engine in an emergency. Current regulations also require a remote stop control for the engine on the bridge.21 This was not a requirement
21 The Vessel Construction and Equipment Regulations (Transport Canada, SOR 2023-257, Part 1 Requirements, Construction – Structure, Subdivision and Stability, Machinery and Electrical Installations, section 100) incorporate SOLAS regulations by reference. The SOLAS regulations (International Maritime Organization,
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 31
when the Cuyahoga’s engine was installed; thus, the only means to stop the engine outside of the engine room was to use the main engine day tank quick-closing fuel valve. In this occurrence, the engine continued to run. When it did stop, it was either because the engine had exhausted the fuel in the supply piping connecting the day tank to the engine, or because of the damage to the engine caused by the fire. 1.10 Engine room fires Fire is an exothermic chemical reaction where fuel rapidly oxidizes. Fires require fuel, an oxidizing agent (air), heat, and a continuous chemical chain reaction to continue burning (Figure 14). Figure 14. The fire tetrahedron: fuel, heat, air, and a chemical chain reaction (Source: TSB) A serious shipboard fire is one that • generates large amounts of heat and smoke within a vessel; • is in a location that is difficult to access; • can spread rapidly; and • can lead to other consequences, such as an explosion or flooding. In general, the crew of a vessel must fight a fire themselves, as support is often unavailable due to the location of the vessel or the specialized nature of marine firefighting. When the fire is in the engine room, a large fuel load is available for the fire in the form of engine fuel,
International Convention for the Safety of Life at Sea (SOLAS), 1974, as amended 2016, Chapter II-1: Construction – structure, subdivision and stability, machinery and electrical installations, Regulation 31: Machinery controls, paragraph 2.3) state that “the main propulsion machinery shall be provided with an emergency stopping device on the navigation bridge which shall be independent of the navigation bridge control system.”
TRANSPORTATION SAFETY BOARD OF CANADA ■ 32 hydraulic fluids, oils, cleaning equipment, power tools, cardboard, and other flammable materials. Research has found that approximately 60% of shipboard fires worldwide originate in the engine room and more than ⅔ of these fires have fuel oil as the primary fuel.22 An important source of fuel is leakage from fuel system failures attributed to vibration and errors in the reassembly of fuel piping components, like fuel injection lines, and insulation on hot surfaces.23 In this occurrence, the fire expanded rapidly: the flames were approximately 4 feet high when the fire was first detected and grew to close to 40 feet in the time it took the fourth engineer to travel between the main deck and the working deck. 1.10.1 Fuel and heat Whether the fuel source is solid, liquid, or gaseous, only a vapour burns; that is, to burn, solids and liquids must be heated to temperatures that cause them to emit vapours. The temperature at which a material emits enough vapour to momentarily ignite in air with an ignition source is called its flashpoint. The temperature at which an ignition source is not required for combustion is a material’s auto-ignition temperature. If the temperature of the vapour of a flammable material is beyond the material’s auto-ignition temperature, hot surface ignition can occur.24 The flashpoint of the marine diesel oil used by the Cuyahoga was 76 ℃,25 and a typical auto- ignition temperature for marine diesel oil is approximately 250 ℃.26 1.10.2 Effects of ventilation in a compartment fire Flame and heat paths start and end at ventilation openings. At the early stage of a fire in a large compartment, the fire’s intensity is determined by the amount of fuel available. Hot gases created by fire rise and circulate, and heat is radiated from the layer that is subsequently formed. Depending on the level of ventilation and the amount of heat radiated, other flammable materials may ignite. When this happens, the entire compartment becomes involved, intensifying the fire and increasing the risk that the fire spreads to other compartments as the heat is transferred by conduction.
22 Gard AS, “Engine room fires are still a major concern” (13 February 2025), at https://gard.no/insights/engine- room-fires-are-still-a-major-concern/ (last accessed 16 July 2025). 23 A. Charchalis and S. Czyż, “Analysis of fire hazard and safety requirements of a [sic] sea vessel engine rooms,” Journal of KONES Powertrain and Transport, Vol. 18, No. 2 (2011), at https://kones.eu/ep/2011/vol18/no2/6.pdf (last accessed 16 July 2025). 24 The geometry of the surface and the air flow close to the surface are also factors (Source: V. Babrauskas, “Ignition of gases, vapors, and liquids by hot surfaces,” Fire Technology, Vol. 58, No. 2 [2022], pp. 281–310). 25 Sterling Fuels, Product loading ticket (16 May 2023). 26 W. Tang, D. Bahrami, L. Yuan, et al., “Hot surface ignition of liquid fuels under ventilation,” Mining, Metallurgy & Exploration, Vol. 39 (2022), pp. 961–968.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 33
The intensity of a fire in its later stages depends mostly on the amount of oxygen available. If a compartment is sealed, the fire may extinguish when all available oxygen has been consumed. 1.10.3 Guidance on preventing engine room fires Chapter II-2 of SOLAS contains regulations intended to reduce the probability of ignition by containing fuel sprays and preventing contact with surfaces at temperatures above 220 °C. This is accomplished by shielding connections of low-pressure fuel piping, containment of leaks, and the insulation of hot surfaces. In 2000, Transport Canada (TC) circulated a ship safety bulletin27 intended to remind mariners of the fire hazards posed by fuel and oil piping systems. The bulletin identified areas where attention should be paid, but it provided little specific guidance for use by owners or crew. In 2009, the IMO published a circular28 that highlighted measures to prevent engine room fires and provided specific guidance on the maintenance and design of engine rooms with respect to fire prevention. The IMO distributed the circular to flag state administrations, including Canada, with the intention that the information would be distributed widely to vessel owners, operators, builders, designers, and other parties. This information was not distributed through TC’s ship safety bulletin system because TC determined that the information was not applicable to non-SOLAS vessels. Among other things, the IMO guidelines identify: • Causes for fuel system failures • Design and installation considerations for piping systems • Methods for shielding piping system joints • Design and installation considerations for the insulation of hot surfaces For example, guidance is provided to ensure that pipe flanges and expansion joints are completely insulated. In 2021, the International Association of Classification Societies (IACS) provided guidance to classification societies on measures to prevent fires in machinery spaces. The IACS guidance highlights classification society experience and is intended to improve owner awareness by referencing the IMO circular.29
27 Transport Canada, Ship Safety Bulletin (SSB) 08/2000: “Fire Precaution with Respect to Fuel Oil, Lubricating Oil, Hydraulic Oil Piping and Fittings” (22 June 2000). 28 International Maritime Organization, MSC.1/Circ.1321, Guidelines for Measures to Prevent Fire in Engine- Rooms and Cargo Pump-Rooms (11 June 2009). 29 International Association of Classification Societies, IACS Rec. 1999/Rev.2 2021, No. 58, Fire Protection of Machinery Spaces.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 34 In Canada, the Vessel Fire Safety Regulations require that measures be put in place to prevent oil from contacting heated surfaces. The existing Canadian regulatory requirements provide only qualitative guidance. The Cuyahoga was required to insulate surfaces of over 220 ℃. 1.11 Fire protection in machinery spaces Given the risk posed by fires, vessels must meet requirements for structural fire protection. Vessels such as the Cuyahoga must also be equipped with fixed fire suppression systems and other equipment for fighting a fire, such as firefighter outfits and fire pumps.30 The following are the basic principles for setting fire safety requirements for machinery spaces: • Limitation of contact between flammable material and hot surfaces • Detection of fire • Containment of fire • Provision of means of control and extinguishment • Provision of means of escape 1.11.1 Ventilation Machinery spaces are ventilated to supply fresh air and to exhaust fumes and excess heat. On the Cuyahoga, both the ventilation intakes and exhaust outtakes were located on the boat deck, aft of the skylight, and were fitted with dampers to isolate the engine room in case of a fire. 1.11.2 Portholes and fire doors On the main deck level of the engine room, there were 17 portholes that opened from the inside. Each porthole was equipped with a cast steel-hinged cover intended to prevent water ingress in rough weather if the porthole glass breaks. Before the fire started, 3 of the portholes in the main engine room had been secured open to improve air circulation. The fire doors between the boiler room, main engine room, and diesel generator compartment were also secured open; fire doors are intended to be kept closed when the vessel is under way. After the machinery spaces had been evacuated, there were no means to close the portholes or fire doors from outside the spaces because there were no remote closing devices. 1.11.3 Skylight hatch The skylight hatch was used to move equipment and material in and out of the main engine room (Figure 15). The hatch was often left open to improve the circulation of air in the main engine room.
30 Transport Canada, SOR/2017-14, Vessel Fire Safety Regulations (as amended 23 November 2022).
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 35
The skylight hatch was opened and closed using a power-operated winch. Normally, this winch was controlled remotely from the engine room, but it could also be opened and closed locally by using a manual crank. Marine electrical standards31 on vessels such as the Cuyahoga require the use of electrical cables that meet minimum fire- and flame-resistance requirements. In Canada, cable for marine use must meet the standards set out in Transport Canada TP 127, Ships Electrical
31 For applicable standards, see also Transport Canada, TP 13585, Marine Safety Management System (Online Manual), Tier I – Policies, Acceptance of Marine and Offshore Electrical Cable.
Figure 15. Skylight hatch and winch (circled) (Source: TSB)
TRANSPORTATION SAFETY BOARD OF CANADA ■ 36 Standards (2018). Additional protection is provided by routing exposed electrical cables in metal conduits. The electrical cable for the remote control was not approved for marine use and did not have the required flame rating. From the working-deck level to the skylight, approximately 10 m of cable ran vertically along the inside of the engine room casing without any mechanical protection, such as metal conduit. The exposed section of cable was destroyed in the fire and the insulation behind it was damaged. The switch in the engine room was inaccessible once the engine room had been evacuated. From the boat deck, both the chief engineer and fourth engineer observed the hatch opening wider during the 1st attempt to close it. It is likely that a temporary short was created by the thermal degradation of the conductor insulation, so that the winch motor contactor was energized. Heat and smoke coming from the skylight hatch and the temperature of the surrounding steel structure initially prevented the crew from approaching the winch to use the manual crank to close the hatch. Similarly, the crew were also unable to approach the engine room ventilation fan dampers. Consequently, it was approximately 15 minutes before the fourth engineer was eventually able to reach the winch and the dampers by using several portable CO2 extinguishers to temporarily cool the deck enough to walk on it. 1.11.4 Carbon dioxide fixed fire suppression systems CO2 is colourless, odourless, non-flammable, and non-conductive, and is often used for fire suppression in machinery spaces. Exposure to high levels of CO2 can cause fatal injury. Because CO2 is stored as a liquid, the pressures and temperatures involved during release pose additional safety hazards. The Cuyahoga was fitted with a CO2 fixed fire suppression system to protect the engine and boiler rooms. The system was installed in 2002 as part of an upgrade to the vessel. The system comprised 40 CO2 cylinders of a nominal 45 kg capacity for a total of 1800 kg (Figure 16). The CO2 could be released into either the engine or boiler rooms in stages or all at once.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 37
Figure 16. Layout of the CO2 fixed fire suppression system as installed on the Cuyahoga (Source: TSB) 1 Cable-operated directional stop valve, 2 Tandem cable-operated control head, 3 30-second discharge delay, 4 Pressure-operated siren, 5 Flexible actuation hose, 6 Stainless steel pull cable, 7 Engine room stop valve, 8 Boiler room stop valve, 9 One of 40 CO2 cylinders, 10 Flexible discharge hose, 11 Check valve. On each side, 2 discharge cylinders were connected by a cable-operated tandem control head. When activated, the tandem control head caused the contents of both cylinders to
TRANSPORTATION SAFETY BOARD OF CANADA ■ 38 pressurize the manifold, which then opened the valves of the rest of the cylinders. The system used directional stop valves to direct the flow of some of the CO2 to a control circuit. Downstream of the directional stop valves, the control circuit contained a discharge delay device in the cylinder room and pressure-operated sirens mounted in the protected spaces to alert crew members that the system had been activated. When the 30-second delay had passed, CO2 pressure opened the main stop valve for the space into which the CO2 was being directed. 1.11.4.1 Remote release A recognized industry standard for CO2 fixed fire suppression systems published by National Fire Prevention Association, to which the Cuyahoga’s system was designed, states that ‘’[a]ll devices shall be located, installed, or protected so that they are not subject to mechanical, chemical, or other damage that would render them inoperative.’’32 Neither SOLAS nor Canadian regulations specify where remote release cables can be routed. IACS member rules also make no specification on routing. However, additional guidelines for general use in the marine industry, published by the American Bureau of Shipping, recommend that “…cables and other operating mechanisms should never be installed in locations where they will be subject to the effect of weather, corrosion, etc. In addition, actuation cables and tubing should not run through the protected spaces.”33 On the Cuyahoga, individual remote release cables ran through 4 zinc-galvanized steel conduits that were attached together to form a continuous run so that no individual stainless steel cable was exposed.34 All 4 conduits ran through the top of the engine room, near the skylight (Figure 17).
32 U.S. National Fire Protection Association, NFPA 12, Standard on Carbon Dioxide Systems. 33 American Bureau of Shipping, Guidance Notes on Fire-Fighting Systems (May 2005; updated February 2015), section 4, subsection 3.1.10: Location of Controls for Extinguishing Medium Release. 34 The installation plan for the CO2 system was approved by TC in 2002. The plan stated that the exact location of the cables was to be “site-verified.”
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 39
Figure 17. The conduits for the remote release cables passed close to the skylight and the cables were damaged in the fire (circled location). The insulation on the boundary between the engine room and accommodation spaces was partially destroyed. (Source: TSB)
The Cuyahoga’s system used 4 stainless steel cables to trigger the CO2 release remotely. Two were connected to the control heads on the directional stop valves and 2 were connected to the tandem control heads for the discharge valves on the cylinders. The order of operation depended on which space the CO2 was to be released in but, in any case, the directional stop valve was to be operated before the tandem control valve (Figure 16). The remote CO2 release station was located next to the engine room access door in the aft deckhouse accommodations. Instructions for remote release were posted at the release station. The posted instructions, developed by the crew, gave information about how to confirm the CO2 had been released and what to do after the release (for example, safety precautions and boundary cooling).35
35 This information was developed after an earlier fire on board another Lower Lakes Towing Inc. vessel, the Tecumseh (TSB Marine Transportation Safety Investigation Report M19C0403).
TRANSPORTATION SAFETY BOARD OF CANADA ■ 40 Finding: Other Following an earlier fire on board another LLT vessel, instructions at the Cuyahoga’s remote CO2 release station were revised to give accurate information about how to confirm that a release was successful and describe post-release safety precautions. The chief engineer attempted to use the remote release during the fire but felt no resistance on the cables when he pulled them. The cables failed and 3 to 4 m of cable were pulled out of the conduit. Personnel at the TSB laboratory examined the cables. This examination found the stainless steel cables to have been exposed to elevated temperatures and molten zinc during the occurrence fire, which caused liquid metal embrittlement of the cable. The zinc originated from the conduit that housed the cable. 1.11.4.2 Local release A CO2 release can be triggered locally by accessing the CO2 cylinder room and manually activating the control heads. A local CO2 release carries higher risks for the operators due to the potential for CO2 to leak into the cylinder room. Each CO2 system is installed in a vessel-specific arrangement and the physical placement of the elements in the arrangement may differ. The instructions for local CO2 release should help ensure that the system functions as intended and that risks to a crew member in the cylinder room are minimized by clearly indicating the correct order of operation. The directional stop valve (Figure 16, annotation 1), which allows the CO2 to enter the protected space, should be opened first; the control head (Figure 16, annotation 2), which controls discharge of the gas from the cylinders, should be opened next.36 This order of operation minimizes the chance that pressure will build up and CO2 will leak into the cylinder room. Instructions for local release were attached to the pilot cylinders in the Cuyahoga’s CO2 cylinder room. The instructions for local release directed the operator to first trigger the release of the CO2 by activating the control heads and then to activate the directional stop valve. The instructions were based on an example in the manufacturer’s manual for a simpler system that was configured differently. A post-occurrence examination of the Cuyahoga’s manifold layout showed that the directional stop valves (Figure 16, annotation 1) were in the closed position and had not been activated by the remote pull cable or manually. In addition, 7 out of 40 hose connections on the valve heads were found to be only finger-tight. A representative from a third-party service provider who attended the vessel after the occurrence found many other leaks: approximately a third of the cylinder valves had loose swivel nuts at the connection to their discharge heads and, in some instances, the sealing O-rings between the cylinder valves and discharge heads were missing (Figure 18). When the cylinders were weighed
36 International Maritime Organization, FSS Code: International Code for Fire Safety Systems (2015), chapter 5: Fixed gas fire-extinguishing systems, section 2.2.2.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 41
during post-discharge maintenance, the weight of each was that of an empty cylinder, indicating that all 1800 kg of CO2 had been released into the CO2 cylinder room. Figure 18. Diagram of the head of a CO2 cylinder showing the valves and the O-rings that were missing or damaged at the time of use (Source: Manufacturer’s manual, with TSB modifications) 1.11.4.3 Inspection and maintenance requirements Vessel crews, authorized representatives, flag state administrations, recognized organizations (ROs), and classification societies often rely on third-party service providers for annual and periodic maintenance service on fixed fire suppression systems. To ensure that the service providers meet a minimum standard, classification societies issue approval certificates to service providers. To issue an approval certificate, the classification society performs an audit of the service provider’s management systems, according to IACS guidelines.37 In general, to obtain approval, service suppliers must • demonstrate knowledge of fire theory and firefighting; • demonstrate knowledge of the basic principles of the systems that they service; • have access to the manufacturer’s instructions and service bulletins and any relevant IMO guidelines;38 and
37 International Association of Classification Societies, UR-Z17, 1997, Rev.18, Corr.1, Procedural Requirements for Service Suppliers. 38 For example, see International Maritime Organization circulars MSC/Circ. 1318 and 1432.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 42 • document procedures for installing and servicing the systems that they are seeking approval for. Approval certificates from class society auditors outline the scope of the services the provider is authorized to supply. Class approval certificates are renewed at intervals not exceeding 5 years following audits that are conducted to determine whether the original conditions and scope of service have been maintained. The third-party service provider that performed the last servicing of the Cuyahoga’s CO2 system had been issued an approval certificate in December 2019 that was valid until January 2023. The service provider had changed ownership twice during the certificate validity period. In this occurrence, Lloyd’s Register authorized the use of the service provider because the approval certificate was still valid at the beginning of the Cuyahoga’s winter layup period. The certificate expired 1 day after LLT issued a purchase order for the annual maintenance of the fire detection and extinguishing equipment. At the time the maintenance was performed on the Cuyahoga, and at the time of the occurrence, the certificate had not been renewed. IACS guidelines state that the training of individuals involved in the installation or maintenance of these fire suppression systems is left to the discretion of the service provider. Under SOLAS and Canadian regulations, there are no minimum training requirements specified for technicians performing maintenance work on the CO2 fixed fire suppression systems used on vessels. Unlike technicians for lifeboats and life rafts,39 technicians performing maintenance on fixed fire suppression systems have no specific regulatory requirement to be factory-trained or trained to a recognized standard. However, the manufacturer’s instructions for the Cuyahoga’s CO2 fixed fire suppression system stated that it should be serviced annually and bi-annually by factory-trained technicians. These services are carried out by third-party service suppliers. These suppliers must be authorized by the manufacturer in order to have access to the manufacturer’s parts, maintenance training, and technical support. In January 2023, LLT issued a purchase order for the annual inspection and maintenance of all fire suppression and detection systems on the vessel to a U.S.-based, manufacturer- authorized service provider. In March 2023, technicians boarded the vessel to service the vessel’s fixed fire suppression systems and weigh the cylinders. Following the work, the service provider gave the owner a report stating the systems had been serviced and the cylinders weighed according to U.S. Coast Guard regulations.
39 Transport Canada, C.R.C., c. 1436, Life Saving Equipment Regulations, part II, subsection 114(3).
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 43
During maintenance work, defects can be overlooked when technicians are not sufficiently trained in what to watch for or when they do not expect to find a problem. The manufacturer’s instructions state that individuals removing and replacing flexible hoses, control heads, or discharge heads must be trained in the maintenance procedures. The manufacturer instructs technicians to verify the tightness of connections and seals and to look for missing O-rings at every visit to a vessel because missing O-rings and loose connections are known as likely modes of failure. The training instructs technicians to check for these problems when performing maintenance work. The technicians who serviced the engine room CO2 fixed fire suppression system had no record of having received installation, inspection, or maintenance training from the manufacturer of the Cuyahoga’s CO2 system or training on any other CO2 fixed fire suppression system approved for marine use. An earlier version of the manufacturer’s manual (dated 2002) recommends that the monthly inspection should be done by an authorized distributor.40 In contrast, the manufacturer’s training for marine service technicians states that a routine inspection is to be performed monthly by vessel crew members;41 this is a common industry practice. Monthly inspection items in the manufacturer’s manual include the following (see Appendix A for the full instructions):
- Inspect CO2 system discharge heads for cracks, corrosion, grime, etc. Ensure that
discharge heads are tightly secured to each CO2 cylinder valve and connected to the discharge manifold with a flexible discharge hose or swivel adapter.
- Inspect flexible discharge hoses for loose fittings, damaged threads, cracks, rust,
kinks, distortion, dirt, and frayed wire braid. Tighten loose fittings, and replace hoses which have stripped threads.42 The vessel had a copy of the manufacturer’s maintenance instructions on board. Electronic versions of the manual are also available at the manufacturer’s website and can be downloaded for free. The vessel’s planned maintenance system contained tasks for monthly and annual inspections. These tasks did not contain details of the manufacturer’s requirements, nor did the tasks refer to the manual. Work orders for monthly inspections generated by the planned maintenance program had been signed off as being completed twice between March 2023 and the day of the occurrence. In each instance, the crew
40 Kidde Fire Systems (P/N 81-CO2MAN-001), CO2 Carbon Dioxide Fire Suppression Systems: Owner’s Manual (January 2002), section 2-5.1 Monthly Inspection, p. 2-4. The manual is now entitled Engineered Carbon Dioxide (CO2) Fire Suppression Systems: Design, Installation, Operation and Maintenance Manual. 41 Carrier, Kidde Fire Systems Marine Technician Training (updated November 2022), slides 70-71. 42 Kidde Fire Systems (P/N 81-CO2MAN-001), Engineered Carbon Dioxide (CO2) Fire Suppression Systems: Design, Installation, Operation and Maintenance Manual (September 2013), section 6-3 Inspection Procedures – Monthly, p. 6-2.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 44 completed a rapid visual inspection of the CO2 cylinder room to ensure that the cylinders and room were clean and free of debris. The investigation found that vessel managers and the crew members who had been assigned responsibility for completing the monthly inspection were unaware of the manufacturer’s requirements. They were also unaware of the manufacturer’s annual maintenance requirements. Additionally, they expected that the technicians provided by the third-party supplier had been trained by the manufacturer, without verifying that this was the case. Inadequate maintenance of fixed fire suppression systems has been identified by other national marine accident investigation agencies as a contributing factor in occurrences. For example, following investigations into 2 occurrences, the United Kingdom Marine Accident Investigation Board found that there is an overreliance on shore-based contractors to perform maintenance on these systems.43 The U.S. Coast Guard identified technician competency and crew knowledge of operation and maintenance as 2 safety issues in vessel fires.44 1.11.5 Water supply to the fire main line The Cuyahoga’s fire main line could be supplied with water by the fire pump, the bilge pump, or the emergency fire pump. Both the fire pump and the bilge pump were in the engine room. The emergency fire pump was located outside of the engine room, as required by regulation,45 to ensure that the vessel had at least 1 pump available to supply the fire main regardless of the location of the fire. The emergency fire pump was a centrifugal pump driven by an electric induction motor powered by the emergency switchboard. The pump could be started locally or remotely. The emergency fire pump was accessed from the unloading tunnel and from the engine room. The emergency fire pump was connected to the fire main piping by an isolation valve located in the boiler room. This valve was normally left open so that the pump could supply water to the fire main in an emergency. According to SOLAS regulations,46 isolation valves must not be located in a machinery space. Due to
43 United Kingdom Maritime and Coastguard Agency, Safety Bulletin 12: Accidental CO2 Releases Onboard 2 UK Merchant Vessels (12 September 2018), available at https://www.gov.uk/government/publications/safety-bulletin-12-accidental-carbon-dioxide-releases- onboard-uk-merchant-vessels/safety-bulletin-12-accidental-co2-releases-onboard-2-uk-merchant-vessels (last accessed 30 July 2025). 44 United States Coast Guard, Safety Alert 07-17, CO2 Hazards are nothing new, but we’d like to remind you of what not to do! (20 July 2017) and United States Coast Guard, Notice 02-12, Servicing of Shipboard CO2 Fire Suppression Systems, “What you don’t know can kill you” (08 June 2012). 45 Transport Canada, SOR/2017-14, Vessel Fire Safety Regulations (as amended 23 November 2022), sections 131 to 134, and International Maritime Organization, International Convention for the Safety of Life at Sea [SOLAS], 1974, as amended 2016, Chapter II-2, Regulation 10, paragraph 2.2.3.2. 46 International Maritime Organization, International Convention for the Safety of Life at Sea (SOLAS), 1974, as amended 2016, Chapter II-2, Regulation 10.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 45
the construction date of the Cuyahoga, the vessel was exempt from this requirement under SOLAS and Canadian regulations. When electrical power was supplied by the emergency generator, emergency lights provided low levels of lighting in the unloading tunnel. The emergency generator did not provide power for the mechanical ventilation of the tunnel. Access to and from the tunnel was limited to the entrance at the forward end of the vessel or through the emergency escape hatch located at midship. Communication between the location of the emergency fire pump and the wheelhouse by portable radio was made difficult due to the surrounding steel structure. The pump was installed below the vessel’s light-load waterline. It was not self-priming or fitted with a priming device, and the pump had a history of becoming airlocked. 1.11.5.1 Inspection and maintenance The vessel maintenance plan required that the emergency fire pump be tested monthly. In the monthly test, crew started the emergency fire pump locally and checked that the pump pressure in the discharge casing reached 70 to 80 psi. If the pressure did not build up, instructions were provided on how to purge air from the pump casing using 2 bleed valves. When the pump was running, crew were instructed to check for unusual noise or vibration before concluding the test. Once these checks were completed, the crew stopped the pump. The vessel maintenance plan also included conducting a monthly visual inspection of the fire main piping, fire hydrants, and hose stations. However, the maintenance plan for the fire main system did not include the isolation valves or their internal parts. Furthermore, the isolation valves were not included on the classification society’s master list of inspection items for the vessel, and there are no records of maintenance, inspection, or replacement of any of the isolation valves in the vessel’s fire main. The emergency fire pump and its electric motor are subject to a regulatory inspection every 5 years. In 2021, a third-party contractor removed the pump and its electric motor from the vessel and dismantled them for a 5-year inspection. The pump components were found to be in satisfactory condition and the pump and motor were reassembled and reinstalled on the vessel. The associated piping and valves were also examined by Lloyd’s Register and an operational test was performed, but the isolation valves were not opened. The emergency fire pump was also checked occasionally during fire drills. During a drill, the pump would be started and the flow of water from the fire hydrants on the forward and aft ends of the vessel would be checked. Records show that during the last fire drill before the occurrence, on 01 May, the pump was run and the flow at the fire hydrants was checked. The post-occurrence inspection of the emergency fire pump and isolation valve found the pump functioned correctly, but the isolation valve obstructed the flow of water to the fire main. The internal parts of the valve were corroded and the valve spindle was disconnected from the gate. This meant that the gate could no longer be moved and was therefore stuck in
TRANSPORTATION SAFETY BOARD OF CANADA ■ 46 the closed position (figures 19, 20, 21). However, the valve spindle was in the open position and the crew was not aware that the gate had disconnected. When operated, the spindle had some resistance, which could give the appearance that the valve was operating normally.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 47
Figure 19. The isolation valve, in position (Source: TSB)
TRANSPORTATION SAFETY BOARD OF CANADA ■ 48 Figure 20. The isolation valve disassembled, showing the disconnected spindle (Source: TSB)
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 49
Figure 21. The isolation valve, showing the disconnected gate (Source: TSB)
An isolation valve used to isolate the section of the fire main in the unloading tunnel from the rest of the fire main system failed in the same way in 2022. In that case, the defective valve was replaced by a spare that was on board. One of the main functions of valves in piping systems in contact with seawater is to prevent accidental water ingress. Valves installed on inlets and discharges connected to the hull below the margin line must be opened for inspection every 5 years during periodic hull inspections. However, other valves in the same piping systems are generally excluded from regulatory inspection. On the Cuyahoga, the hull valves were inspected as required, including the emergency fire pump suction valve. The investigation found no record that the isolation valves in the fire main were inspected. 1.12 Firefighting and fire control operations Steps in shipboard firefighting operations consist of detecting the fire, informing crew, search and rescue, confinement, extinguishing, ventilation, and overhaul. These operations require properly trained and equipped individuals. If the fire is advanced enough, confinement, which includes boundary cooling, may be the best option for control. To achieve this, the hot compartment must be isolated and all of its boundaries must be monitored and cooled as required. The crew must be able to approach the boundaries safely. Conditions may be unknown before entry; extreme heat and toxic vapour or smoke
TRANSPORTATION SAFETY BOARD OF CANADA ■ 50 may be encountered, so crew must be adequately protected. Equipment will protect crew not only from the heat and smoke, but also from any steam generated from water coming into contact with hot steel surfaces during boundary cooling. In any situation where crew enter a space where heat or smoke are present, a second team equipped with firefighting equipment and SCBAs should be available for backup and rescue.47 When a compartment is opened, accumulated heat and smoke may exit following the same path that the team is using to enter. Advancing charged fire hoses in interior spaces can be complicated by narrow corridors, bends, corners, ladders, equipment, or furniture, and may require many firefighters. Accessing boundaries or making a direct attack may require passage through vertical and horizontal openings. A firefighter may have to be positioned at each door or hatch to prevent snagging. Firefighting efforts can be strenuous, and firefighters can quickly exhaust air supplies, requiring that relief or intervention teams be assembled for each team making entry. To ensure adequate air for egress, every firefighter inside a compartment should begin to exit before the alarm signalling low air pressure on their SCBA sounds. When temperatures in the compartment are high, firefighters may be limited to only 10 minutes inside.48 Canadian vessels of 500 gross tonnes or more are required to carry a minimum of 2 firefighter outfits and 2 SCBAs with 2 spare charged air cylinders;49 tankers are required to carry additional equipment. Firefighter outfits and SCBAs are required to be stored in “widely separated positions.”50 The TSB has found in other occurrences that when the minimum quantity of equipment is carried onboard, firefighting operations are limited. For example, in an engine room fire on another LLT vessel, the Tecumseh,51 crew entered the engine room to fight the fire, using the fire hose as a lifeline. The crew members became separated and had to exit approximately 20 minutes later, before locating the seat of the fire, because their SCBAs ran low on air. No relief team was available, the crew abandoned firefighting efforts in the engine room, and the fire worsened. At the time of the occurrence, the Cuyahoga was equipped with the required minimum of 2 firefighter outfits and 2 SCBAs with 4 charged air cylinders. On the Cuyahoga, 1 firefighting equipment locker was located on the forward deckhouse and the other was located on the boat deck of the aft deckhouse (Figure 22).
47 International Fire Service Training Association, Marine Fire Fighting for Land-Based Firefighters, Third Edition (2019). 48 Ibid. 49 There is no requirement for the firefighter outfits or self-contained breathing apparatuses to be fitted to the crew members assigned to wear them. 50 International Maritime Organization, International Convention for the Safety of Life at Sea (SOLAS), 1974, as amended 2016, Chapter II-2, Regulation 10, paragraph 10.3.1. 51 TSB marine transportation safety investigation report M19C0403.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 51
Figure 22. One firefighter outfit and SCBA was stored on the boat deck and 1 set was stored on the forecastle deck (Source: TSB). In previous occurrences, a lack of firefighting equipment and a lack of familiarity have led to crew member injuries and placed people in danger when responding to vessel fires.52 In this occurrence, the decision to use the CO2 system even though the engine room was not properly sealed was influenced by the fact the Cuyahoga carried only enough equipment for 1 team of 2 firefighters, which was insufficient for an engine room fire. 1.13 Human factors issues 1.13.1 Sleep During sleep, the human body cycles through 4 different stages (Table 3): 3 stages of progressively deeper sleep (stages N1 to N3) and rapid eye movement (REM) sleep, when dreams occur. The 1st episode of stage N3 sleep, the deepest sleep, usually occurs about 30 to 45 minutes after sleep onset and can last as long as 1 hour. Table 3. Summary of the 4 sleep stages Sleep stage Characteristics Typical duration Proportion of total (nightly) sleep (%) N1 Light: some muscle tone, breathing is regular 1 to 5 minutes 5 to 10 N2 Moderately deep: heart rate and body temperature drop 20 to 35 minutes 40 to 50 N3 Deepest: slow wave, fully asleep Up to 1 hour 10 to 20 R (REM) When dreams occur 1 to 45 minutes 15 to 20
52 TSB marine transportation safety investigation reports M20A0004, M18P0014, and M02N0007.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 52 The second engineer went to sleep at approximately 2100 on the night of the occurrence. The investigation determined he was likely in deep, stage N3 sleep when the fire alarm was sounded. 1.13.2 Decision making and stress in emergency situations Emergencies are stressful situations that create high cognitive workloads. In emergencies, people have limited time to process various types of critical information, make decisions, assess the results, and adjust actions accordingly.53 Stressful, high-workload situations can affect human performance and may result in people taking inappropriate action.54 One of the more significant impacts on performance is with respect to a person’s attention. For example, attentional tunnelling results when an individual becomes more selective with regard to what they are focusing on, either intentionally or unintentionally. This focused attention can be desirable in certain situations, but it can come at a cost as the person may potentially miss other pieces of information that could be important in managing the situation. For instance, during an emergency, a person may become focused on finding another who is missing, including searching in smoke-filled areas, without considering the risk to themselves. The marine industry’s primary method to prepare crew members to manage unexpected situations is via procedures, training, and regular emergency drills. Being able to make an accurate and comprehensive situation assessment and having good situational awareness55 are critical for good decision making. In an emergency, a person may face a novel situation that is neither typical nor included in any procedures or any training they may have received. Realistic scenarios in training and drills, and the associated post-drill debriefs, allow crew members to become aware of the variability connected to emergency situations. They can thereby acquire the knowledge and skills necessary to respond effectively to new and unexpected situations and to make rapid decisions. 1.14 Safety in marine operations Safety in marine operations is the shared responsibility of everyone who interacts with the vessel, from crew to shore staff to regulators. Safety is more than the absence of accidents or even compliance with regulations; rather, it depends on a mature safety culture and documented, systematic processes.
53 M. Yu, T. Zhu, and S. Donaldson, “Effects of time pressure on behavioural decision making in natural disasters: Based on an online experimental system,” Journal of Geography & Natural Disasters, Vol. 8, No. 1 (2018). 54 C.D. Wickens, W.S. Helton, J.G. Hollands, et al., Engineering Psychology and Human Performance, Fifth Edition (Routledge, 2022), p. 492–493. 55 Situational awareness is a construct that describes how people perceive information about their immediate environment, understand its meaning and, as a result, predict a future state about it, thus creating an awareness of the present situation
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 53
The IMO adopted the International Safety Management (ISM) Code in 1993, which came into force in 1998. The ISM Code provides an international standard for the safe and reliable operation of a ship and its equipment and supports compliance with all applicable regulations and requirements. To demonstrate compliance with the ISM Code, external and internal audits are conducted. A vessel is issued a safety management certificate and its operating company is issued a document of compliance once the systems in place have been audited by an accredited organization. Vessel-specific requirements under the ISM Code include the development of plans for shipboard operations and emergency preparedness, and documentation of the vessel’s maintenance system. The ISM Code is the basis for Canadian requirements for safety management systems, which, since 2024, have been required for the vast majority of commercial vessels.56 An effective safety management system (SMS) accounts for all factors that impact safety, including human and organizational factors. Three elements of safety management that are recognized as being less developed in many SMSs are as follows: • Reporting of minor incidents Reporting, including of accidents, incidents and, more importantly, near misses and non-conformances, is critical to effective safety management. Research demonstrates that seafarers believe that only major near misses should be reported to the company.57 • Routine maintenance practices and procedures IACS noted in 2001 and again in 2018 that the management of shipboard maintenance is seen as “an entirely technical matter, somehow unrelated to safety and the exclusive responsibility of technical staff.”58 Technical staff here may include shore-side technical managers or simply the engine room crews. • Systems for improvement that incorporate feedback from crew and others who use the SMS Understanding gaps between procedures and work practices is essential for continuous improvement.59,60,61
56 Transport Canada, Marine Safety Management System Regulations (SOR/2024-133) and Fishing Vessel Safety Regulations (CRC, c.1486). 57 N. Hasanspahić, V. Frančić, S. Vujičić, T. Biočić, “Reporting culture – A prerequisite for safety in shipping,” Journal of Maritime Sciences, 2023, pp. 91–112. 58 International Association of Classification Societies (IACS Rec. 2001/Rev.2), A Guide to Managing Maintenance in Accordance with the Requirements of the ISM Code, 2018, pp. 1–9. 59 S. Dekker, Safety Differently: Human Factors for a New Era, Second Edition (CRC Press, 2015), p. 107. 60 J. Reason, The Human Contribution: Unsafe Acts, Accidents, and Heroic Recoveries (CRC Press, 2008), pp. 86–87. 61 C. Kuo, Safety Management and its Maritime Application (The Nautical Institute, 2007), p. 93.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 54 A recent IMO Maritime Safety Committee (MSC) study62 on the effectiveness and effective implementation of the ISM Code found that many seafarers are reluctant to report non- conformities and deficiencies or to report hazardous occurrences to management. The study notes that feedback and reporting between ship-based crew and shore-based management is a key requirement for managing safety, and that this is an area of concern. 1.14.1 Lower Lakes Towing safety management system At the time of the occurrence, LLT was not required to have an SMS; the SMS was voluntarily implemented in 2015. 63 Whether it is required or voluntary, an RO-audited SMS must comply with the ISM Code. Among other things, the ISM Code requires external and internal audits to ensure that the requirements of the code are being met. External audits of the company and vessel SMS had been carried out by the American Bureau of Shipping since the SMS was implemented. At the time of the occurrence, LLT held a voluntary document of compliance for this type of vessel and the Cuyahoga held a voluntary safety management certificate. LLT’s SMS is documented in a manual entitled Safety Management System: Policies and Procedures. The company last revised the manual in 2023. At the vessel level, management of the LLT program considers most aspects of vessel operation to be the responsibility of individual masters; most vessel-specific operational procedures are documented on the vessel only and are left to the discretion of the master. LLT’s Safety Management System: Policies and Procedures manual is supplemented by documents such as: • vessel-specific training manuals (for example, a firefighting equipment and training manual, a life-saving appliances manual); • company training manual; • printed copies of some Canadian and U.S. regulations; • safety memos and fleet advisories; • manufacturer manuals and bulletins; and • LLT’s marine emergency response plan (MERP). The company’s SMS is supported by workplace safety software. This software is used by all crew members and by shore managers for safety planning and for preparation of work permits; identification and assessment of injuries, hazards, and risks; inspection and auditing; corrective action and monitoring; and so on.
62 International Maritime Organization, MSC 109 INF.3 Study on the Effective Implementation of the International Safety Management (ISM) Code, 23 September 2024. 63 Under the updated Marine Safety Management System Regulations (SOR/2024-133, last amended on 03 July 2024), vessels such as the Cuyahoga are required to have a safety management system.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 55
- 14.2
Lower Lakes Towing maintenance policies and procedures LLT’s policy for the maintenance of its ships and equipment states that the company intends to maintain its vessels to ensure safe, economical, and continued service. It outlines management and crew responsibilities for budget and cost controls and the preparation for drydocks. The policy states that when critical equipment, such as the main engine, becomes defective and requires repair, the situation must be immediately reported to the master and vessel manager, and that the MERP should be utilized, as required. The policy also sets responsibilities for crew members expected to perform planned maintenance and to use the planned maintenance system. The planned maintenance system software was used to schedule and track routine maintenance, such as manufacturer-required and regulatory maintenance, and to plan maintenance that required a break in operations, was being deferred to a non-operational period, or required additional resources. Planned maintenance tasks based on time or calendar frequency are generated by the software automatically and are intended to provide the instructions and information necessary for maintenance staff to perform the tasks, including references to instructions on the applicable pages of the manufacturer’s manual. 1.14.2.1 Reporting and analysis of technical non-conformities and near misses To establish safety requirements beyond those found in the applicable rules and regulations, and as described in the ISM Code, the company must take into consideration the age of the vessel and its machinery, previous maintenance histories, technical non- conformities, and manufacturer recommendations. Technical non-conformities or deficiencies may be discovered during operations or routine maintenance. Technical non- conformities can lead to hazardous conditions. To mitigate the risk posed by these situations, crew must take corrective action. To choose the best course of action, the defect must be identified and its causes diagnosed. The recording and analysis of the vessel’s maintenance history is therefore essential in knowing what tasks need to be done to keep the vessel operating safely, and what ongoing monitoring is needed. LLT’s policy for the maintenance of ships and equipment does not contain instructions or guidance for the reporting or tracking of technical non-conformities or deficiencies. Near-miss incidents are those in which adverse consequences were possible but did not occur. LLT’s SMS policy states that all near-miss incidents should be documented and investigated. The policy lists several examples, including events where a fire could have resulted but did not. The policy directs crew members to report near-miss incidents to their immediate supervisor, who is to then complete the near-miss report form before submitting the report to the company designated person for review and follow-up. The TSB reviewed documented near-miss incidents from the Cuyahoga. These reports typically included occupational health and safety hazards and safety equipment deficiencies. Reports of mechanical problems that meet the definition of near-miss incidents (for
TRANSPORTATION SAFETY BOARD OF CANADA ■ 56 example, repetitive leaks on the fuel injection system with the potential to cause an engine room fire) were not documented. 1.14.2.2 Maintenance records Vessel maintenance records are critical for safety. Detailed and complete maintenance records provide historical data that is needed to analyze equipment failures and determine whether the equipment, scheduled maintenance, or operating procedures require modification. Historical maintenance data also allow for the analysis of trends and enable effective preventive maintenance to be carried out. Most routine maintenance, whether scheduled or in response to minor problems, is carried out when a vessel is operational. Maintenance records are kept for use by the engine room crew and inspectors. Some maintenance records are also used by shore staff for planning operations and the larger or more costly maintenance tasks. The planned maintenance system software on the Cuyahoga was used to record notes related to such maintenance. For example, the fuel manifold repair was recorded in the planned maintenance system software because replacement parts had to be ordered from a vendor; however, when the work order was completed in the planned maintenance system, details of the replacement work were not recorded. The engine room crew also maintained some records and notes in an informal log on a computer. This informal maintenance log was available to crew during operations and handovers but was not available to shore staff. Crew members also kept some personal, handwritten notes with additional details. Continued problems, leaks, and the retightening of the fuel injection lines were also not recorded. Also, the replacement in 2022 of the defective isolation valve in the fire main was not documented. 1.14.3 Marine emergency response plan An MERP sets out procedures for common vessel emergencies. In case of a fire, it should set out fire containment measures for fires in various areas of the vessel. This plan would also normally identify fire hazards and set out instructions for specific tasks to be performed during firefighting activities (for example, steps to take when a crew member is missing during a fire, or how to enter the unloading tunnel when the engine room is on fire). The emergency preparedness section of the LLT SMS manual referred to the MERP. The MERP contained checklists that are intended to be used by vessel masters to document and organize an emergency response to hazardous situations that affect the seaworthiness or safety of the vessel. The MERP checklist for fires and explosions identified what information to collect and to whom it should be reported once the vessel and crew were safe and secure. 1.14.4 Firefighting equipment and training manual The crew on the Cuyahoga had been provided with a manual that contained general information about the emergency equipment available on LLT vessels and the associated
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 57
regulations. The manual was last revised in March 2018. The contents of the manual were generic and used for all LLT vessels. Section 4 of the manual provided information on the use and operation of CO2 fixed fire suppression systems. The manual described the maintenance of a typical system and stated: Carbon dioxide systems do not require a tremendous amount of in-depth maintenance. The best thing that can be done to ensure proper operation is regular inspection. Observe operating controls and mechanisms for obstructions or any other conditions that may interfere with their operation. Pay particular attention to the stowage of materials that may obstruct access to controls or interfere with moving parts. Ensure that nozzles and piping are not clogged with debris, paint, lubricants, or other foreign substances. Most maintenance will be done by a qualified fire equipment technician when a failure has been found or during the annual inspection.64 The manual contained no details specific to the Cuyahoga’s system installation, operation, inspections, or maintenance. 1.14.5 Emergency drills The Fire and Boat Drills Regulations mandate that vessels conduct drills to ensure that crews are prepared to respond in an emergency. Masters are required to “ensure that drills, in so far as is feasible, are carried out as if there were an actual emergency.”65 Emergency drills that include realistic scenarios increase a crew’s preparedness, readiness, and effectiveness in the event of an emergency. Realistic scenarios might include different conditions, such as drilling in the dark or with noise, or drills that deal with a missing member of the team or damaged or inaccessible equipment. Realistic scenarios may also be combinations of individual scenarios and include the potential for escalation, such as a fire on the vessel combined with the risk of an explosion. Taking the time to debrief after drills and exercises is critical so participants can evaluate the effectiveness of a drill, identify areas for improvement, and discuss comments or concerns regarding roles, equipment, and communications. There is no requirement to ensure that drills are conducted in specific locations, such as an engine room where the risk of fire is high; regulations leave the planning and content of drills to the discretion of masters. According to LLT’s SMS, masters are required to develop drills that encompass different emergency scenarios. The company policy suggests drill scenarios, but masters are given flexibility to choose or change the drill scenarios to meet operational requirements.
64 Lower Lakes Towing Ltd., Firefighting Equipment & Training Manual (January 2015, revised March 2018), pp. 3–4. 65 Transport Canada, SOR/2010-83, Fire and Boat Drills Regulations (as amended 23 June 2021), Section 17.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 58 The Cuyahoga’s crew regularly conducted drills. After drills were completed, the master completed an emergency drill report. These reports recorded incident details and duration of the drills and included a section for comments. Typically, during the navigation season, drills were held when the vessel was navigating between ports and at times that would disrupt crew rest periods as little as possible, often starting at 1600. Fire and abandon ship drills were combined, and the crew debriefed at the end. Of the 30 drills conducted between May 2020 and May 2023 on board the Cuyahoga, the average time of the combined drill and debrief was 25 minutes and drills were always carried out during daylight hours. During this same period, only 1 drill was practised for an engine room fire that required a simulated use of the engine room’s CO2 fixed fire suppression system. No drills included searching for a missing crew member. The muster list assignments were posted on the bridge. According to the muster list, 3 crew members were assigned to wear firefighter outfits in an emergency. 1.15 Marine Emergency Duties training A fire on a vessel is a serious event, and crew members are often the best and sometimes the only option for firefighting, particularly in the initial phases of the event. During marine emergency duties (MED) training, students are taught how to respond to vessel fires. The goals of MED training courses are as follows:
- To help seafarers understand the hazards associated with the marine
environment and with their vessel.
- To provide, through approved shore-based courses, training in the skills that
seafarers need to cope with such hazards, to a level appropriate to their functions on board.66 The content of MED training courses is defined by TC67 and approved courses are held at institutions recognized by TC. In basic and advanced firefighting courses, participants are taught the strategies and tactics for controlling fires, how to organize firefighting teams, coordination and communication between teams during firefighting activities, and how to search for and rescue missing crew members. Recognized institutions work to ensure that participants are as prepared as possible to deal with vessel fires in real life, teaching them according to best practices from the firefighting industry. Recognized institutions are required to have at least 1 firefighting outfit and SCBA for each participant. Before practical exercises, instructors ensure that equipment fits the participants to prevent injury. Fit testing of SCBAs is often a pre-requisite for participation in practical firefighting exercises; fit testing ensures that full face masks form effective seals against participants’ faces, thereby conserving air and reducing inhalation of smoke and fumes.
66 Transport Canada, TP 4957, Marine Emergency Duties Training Courses, 2nd Edition (July 2021), section 1.3. 67 Transport Canada, TP 4957, Marine Emergency Duties Training Courses, 2nd Edition (July 2021).
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 59
During practical exercises for fires in engine rooms and accommodation spaces, multiple teams coordinate firefighting efforts: • An entry team of 3 participants is formed to advance a hose into a space, operate the hose nozzle, and communicate with other parties. • A relief team of 3 participants remains outside the space, ready to replace the entry team when they have to exit, or for search and rescue should someone on the entry team be injured or lost. • A 3rd team of 2 or more participants stands by ventilation points, ready to open them immediately prior to the entry team’s attack. • Additional participants perform boundary cooling on exterior spaces. In other occurrences, the TSB has found that crew attempting to apply techniques using multiple teams with inadequate equipment placed crew at risk. For example, in a fire on the Newfoundland Lynx,68 crew had to don equipment that did not fit them. The crew also attempted a combined attack requiring 4 firefighters with only 3 equipped crew members, placing unequipped crew at risk. For all TC marine certificates, MED training is the only required training that includes firefighting skills. This training does not include how to respond to a fire with a single team of only 2 equipped individuals. 1.16 Exemptions to mandatory safety requirements The statutory requirements for maintenance of a vessel define a minimum level of safety. Regulations may contain age-related exemptions (grandfather clauses) that permit authorized representatives to maintain vessels to the original standards of construction unless substantial modifications to systems or equipment are made; nevertheless, existing vessels are typically required to apply new elements that are considered economically feasible. In this context, substantial modifications are those that “substantially alter the vessel’s dimensions or passenger accommodation spaces, […] substantially increase the vessel’s service life or outfitting […] [or involve the replacement of] machinery, systems, [or] equipment.”69 Some Canadian regulations incorporate current SOLAS requirements by reference; SOLAS regulations contain similar provisions. For example, the Vessel Fire Safety Regulations require Canadian vessels to comply with the SOLAS fire regulations (chapter II- 2). However, vessels constructed before the July 2002 entry into force of SOLAS II-2 and subsequent Canadian implementation are exempted from the amended requirements; vessels built after this date have to meet new requirements for fire safety. As a result,
68 TSB Marine Transportation Safety Investigation Report M20A0003. 69 Transport Canada and Natural Resources Canada, SOR/2023-257, Vessel Construction and Equipment Regulations (as amended 20 December 2023), section 11(1), subsection (a), paragraphs (i) and (ii) and subsection (d).
TRANSPORTATION SAFETY BOARD OF CANADA ■ 60 vessels of similar sizes operating in Canadian waters have different construction and equipment requirements.70 In this occurrence, the investigation identified instances where regulations intended to mitigate fire risks were not applied to the Cuyahoga because of age-related exemptions. For example: • shielding the fuel injection line connections on the main engine; • having a main engine remote stop on the bridge; and • not locating an isolation valve in a machinery space. Finding: Other Certain regulations to mitigate fire risks did not apply to the Cuyahoga due to age-related exemptions. 1.17 Previous occurrences Over the years, the TSB has been informed of numerous occurrences involving engine room fires. Between May 2018 and May 2023, 180 fires on commercial vessels were reported to the TSB. The TSB and other international accident investigation bodies have investigated similar marine occurrences (Appendix B). Data on all Canadian marine transportation occurrences since 1995 are available on the TSB website at https://www.tsb.gc.ca/eng/stats/marine/data-6.html. This information is updated monthly. 1.18 TSB Watchlist The TSB Watchlist identifies the key safety issues that need to be addressed to make Canada’s transportation system even safer. The following Watchlist issues are relevant to this occurrence. Safety management is a Watchlist 2022 issue. Although at the time of the occurrence, an SMS was not required by regulation on vessels such as the Cuyahoga, LLT had voluntarily developed and implemented an SMS for its fleet and contracted the American Bureau of Shipping to provide oversight and certification of that system. However, even when operators do have safety management processes in place, they are not always able to demonstrate that hazards are being identified or that effective risk-mitigation measures are being implemented.
70 The Transport Canada registration database can be queried for a snapshot of currently registered vessels. In a snapshot obtained on 29 April 2024 of 388 self-propelled, Canadian-flagged, registered vessels of 500 GT and over, 179 vessels, or approximately 54%, were built before 2000; this category of vessels includes bulk carriers such as the Cuyahoga. For registered vessels of all types and sizes, including barges, this percentage rises to nearly 70%. For comparison, the average age of the vessels in the world merchant fleet is approximately 22 years old (11.6 years old for bulk carriers).
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 61
In 2024, the Marine Safety Management System Regulations (SOR/2024-133) came into force. Under these regulations, commercial vessels apart from fishing vessels are required to develop, implement, and maintain a documented SMS. Regulatory surveillance is a Watchlist 2022 issue. For larger vessels (those more than 24 m long) such as the Cuyahoga, TC delegates most statutory inspections to third-party recognized organizations and then monitors the regulatory compliance of these vessels through compliance inspections. TSB investigations have shown that the regulatory oversight of delegated vessels is not consistent, resulting in situations where regulatory compliance on board these vessels goes unverified. 1.19 TSB laboratory reports The TSB completed the following laboratory reports in support of this investigation: • LPO79-2023 – Mechanical systems analysis • LP097-2023 - NVM Recovery-Computer • LP119-2023 – Fractographic and chemical analysis of air start fitting and CO2 release cable ACTION REQUIRED The issue of safety management in marine transportation will remain on the Watchlist until • TC implements regulations requiring all commercial operators to have formal safety management processes; and • operators that do have an SMS demonstrate to TC that it is working—that hazards are being identified and effective risk-mitigation measures are being implemented. ACTION REQUIRED The issue of regulatory surveillance in marine transportation will remain on the Watchlist until TC provides more oversight of the commercial vessel inspection process by demonstrating that its surveillance and monitoring are effective in ensuring that authorized representatives and recognized organizations are ensuring vessel compliance with regulatory requirements; and until TC demonstrates an increase in proactive surveillance.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 62 2.0 ANALYSIS On 23 May 2023, a fire started in the engine room of the bulk carrier Cuyahoga. The release of carbon dioxide (CO2) from the fixed fire suppression system was not successful, but the fire went out because the main engine stopped. The analysis will look at the causes of the engine room fire and its spread. The analysis will also look at installation and maintenance practices for firefighting equipment. Lastly, the analysis will look at emergency response and preparedness with respect to both emergency procedures and firefighting equipment. 2.1 Causes of the engine room fire 2.1.1 Engine vibration and retaining clamps on the fuel injection lines Fuel system failures associated with engine vibration and the assembly of fuel piping components are a known cause of engine room fires. Fuel injection lines are rigidly connected to the engine’s cylinder heads and to the fuel supply and return manifolds. The lines and connecting fittings are therefore subjected to engine vibration. To secure the lines and reduce the effects of vibration, such as loosening fittings, retaining clamps should be installed. At the time of the occurrence, there were no retaining clamps on the Cuyahoga’s main engine fuel injection lines (figures 6 and 7). The retaining clamps had been present before the occurrence but were most likely removed in 2021 when the fuel supply and return manifolds were replaced. The manifold replacement shifted the connecting points for the fuel injection lines. The investigation could not determine the reason for this shift. However, repositioning the manifold to fit the connection points would have required changes to the main engine fuel piping, which would have been time-consuming, especially during layup periods; this was not done. Because retaining clamps are designed to reduce play, they are attached directly to the cylinder heads. Consequently, the position of these clamps could not be changed. Therefore, after the new manifolds were installed, the fuel injection lines could not be secured with the retaining clamps; as a result, the fuel injection lines were unprotected from the effects of engine vibration. As well, the engine vibration was made worse by the cracked epoxy chocks under the engine mounts. Finding as to causes and contributing factors The retaining clamps on the fuel injection lines were not in place, increasing the fuel lines’ exposure to the effects of engine vibration. Engine room fires are a serious consequence of fuel injection line leaks. However, even though fuel injection line leaks do occasionally happen, engine room fires are relatively rare. Therefore, throughout their careers, marine engineers accumulate experience with maintenance problems such as fuel injection line leaks that have no adverse consequences, minimizing their perception of the risks. The fuel injection lines on the Cuyahoga had leaked intermittently since the fuel supply and return manifolds were replaced. These leaks were addressed by occasional retightening of fuel injection line fittings, or occasional replacement of O-rings as a precaution. The engine
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 63
room crew of the Cuyahoga focused on the immediate and observable mechanical deficiencies rather than on the underlying nature of the problem. They suspected that the engine vibration was high and they accepted that fuel leaks were frequent. When crew workloads were high, crew members prioritized operational tasks that were immediately pressing, such as navigation tasks, repairs needed to maintain navigability, and cargo operations. Non-conformities that could be quickly and inexpensively fixed by the crew, such as the fuel injection line leaks, were perceived as minor technical matters. Due to the priorities resulting from vessel operations and workload, tasks related to the safety management system (SMS), such as documenting maintenance work that fit the criteria for reportable events, were not completed. Consequently, minor technical non-conformities were not typically recorded in the planned maintenance system or through the SMS reporting tools. Although the leaks were corrected when observed, the corrections were not reported. Therefore, the underlying reason for the increased need to retighten the fuel injection line fittings remained uninvestigated, and the crew accepted the increased need for tightening. Finding as to causes and contributing factors Rectifying the fuel injection line leaks was incorporated into routine maintenance tasks. Consequently, there was no evaluation of the cause of the repeated leaks. 2.1.2 Fuel spray from loosened fuel injection line connection Propulsion machinery is critical to the safety of a vessel and its crew. In the event of a failure, a vessel will be unable to navigate, and be placed in a potentially risky situation. A failure of an engine’s fuel system or other machinery or components conveying flammable liquids may pose significant safety hazards. The risks associated with such hazards increase if these failures occur near hot surfaces. The engine manufacturer had specific maintenance instructions for the engine; for example, the torque specification for the fuel injection line fittings and the tools to be used. However, the planned maintenance system did not contain instructions or information related to fuel piping maintenance. There was no process to ensure that crew members were familiarized with the manufacturer’s instructions, such as the instruction to use a double hex flare nut crow’s foot attachment to tighten the fittings in 1 step, which gives better control of the applied torque. Consequently, each member of the engineering crew carried out their assigned maintenance tasks according to their individual experience. The varied nature of this experience increased the likelihood of deviations from expected maintenance procedures, introducing a higher possibility for error during reassembly. Because the fuel injection line installation torque was not known to the crew and the installation procedure was an adapted practice, it is also possible that the fittings were inadequately tightened, which would have sped up the vibration-loosening process.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 64 Finding as to causes and contributing factors Without accurate, documented procedures available to them, crew members developed their own practices for managing fuel injection line leaks; this led to fittings not being adequately tightened to resist the vibration-loosening process. As a result, these deviations from the manufacturer’s instructions likely contributed to the loosening of the fittings. The TSB’s analysis of the fuel injection line fittings showed that by the time a leak was visible, a fitting had loosened. Once a threaded connection on a fitting becomes loose, the joint will eventually disconnect. In this occurrence, when the fuel injection return line on cylinder 7 disconnected, the resulting spray produced a mist of droplets that likely covered the engine and exhaust gas piping with fuel. Finding as to causes and contributing factors A fitting on a fuel injection return line loosened and disconnected, creating a fuel spray. Before this occurrence, the company obtained some updates to the manufacturer’s engine manuals during service visits. However, the update in which the engine manufacturer changed the torque specification for the fuel injection line fittings to a higher value did not reach the crew. Consequently, each time they attempted to fix a leak by retightening a fitting, they were tightening it to the previous value recommended by the engine manufacturer. As a result, the fuel injection line fittings remained under-torqued and were more susceptible to vibration-induced loosening. Finding as to risk If personnel carrying out maintenance work do not have the most current documentation issued by equipment manufacturers, safety updates and corrections will not be available for use. Consequently, poor equipment performance and breakdowns are more likely to occur, increasing the risk to the crew and to the vessel. 2.1.3 Installation of insulation to protect against fire An important means to mitigate the risk of fire in an engine room is to insulate surfaces that could ignite flammable liquids. The International Maritime Organization (IMO) provides guidelines about fire safety, including high-level installation considerations for insulation; these guidelines are referenced by the International Association of Classification Societies, although they are not distributed by Transport Canada. Given that insulation is used in many industries, standards and practices from outside of the marine industry may also be applicable. However, a standard for installing insulation is not applied in the marine industry. In this occurrence, the condition and installation of the insulation on the exhaust gas piping exposed steel surfaces that reached temperatures above the auto-ignition temperature of the engine fuel. The deteriorated condition of the insulation was not recorded by inspectors, crew, or vessel management and the insulation remained in place despite its poor condition. The fuel spray from the disconnected fuel injection return line would have formed a mist that likely reached the nearby exhaust gas piping for the turbocharger and came in contact
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 65
with the hot steel surface exposed by the gaps in the insulation. The quantity and rate of fuel released from the disconnected fuel injection return line and the abundant supply of air to the engine room contributed to the hot surface ignition of the fuel. Finding as to causes and contributing factors Gaps in the insulation exposed hot surfaces on the exhaust gas piping at the turbocharger outlet, and the fuel spray ignited on contact with those surfaces. 2.1.4 Engine room ventilation during fires Machinery spaces such as engine rooms must be capable of being isolated in the case of fire, both to cut off the air supply and to prevent the fire from spreading. To isolate a space, crew seal off openings. Any openings that cannot be closed will result in an incomplete isolation of the space. If a space is protected by a fixed fire suppression system, its extinguishing agent (CO2 in this occurrence) can be released to suppress a fire. However, a period of time is required for the space to cool below the fuel’s auto-ignition temperature. If air is introduced into the space during this period of time, either by crew entering or from openings that were not closed, the fire may re-ignite. In this occurrence, several openings in the boundary of the engine room machinery space were open: • The skylight hatch was partially closed when the fire began. However, it opened fully when the electrical cable for the winch remote control was damaged in the fire. Consequently, it remained open for 15 minutes after the onset of the fire and during the initial attempt to release CO2. • Some portholes and fire doors remained open. These could not be accessed because of heat and smoke in the machinery spaces. Finding as to risk If ventilation points and other openings to a compartment on fire cannot be accessed and closed, there is a risk that efforts to control and extinguish the fire will be delayed or unsuccessful. In this occurrence, the CO2 from the fixed fire suppression system was not discharged into the engine room and therefore had no effect. However, heat and combustion gases vented out through the skylight hatch and air flowed into the location of the fire through the open portholes and fire doors, becoming entrained in the rising flame plume. This air circulation and entrainment helped cool the space and reduce the heat generated by the fire. As well, separately, the main engine fuel supply was cut off. The venting of hot gases and the flow of air at the location of the fire, coupled with the stopped main engine, reduced the buildup of heat in the machinery spaces. This prevented other combustible materials in the machinery spaces from igniting, and the fire was
TRANSPORTATION SAFETY BOARD OF CANADA ■ 66 contained to the engine room. Consequently, the fire extinguished itself when the spray of fuel stopped. Finding: Other Although the CO2 fixed fire suppression system was not discharged, the ventilation through the skylight likely helped stop the fire from spreading, and the engine shutting down meant that the fuel flow to the fire ceased, allowing the fire to extinguish itself. 2.2 Fixed firefighting equipment maintenance and installation 2.2.1 Carbon dioxide fixed fire suppression systems Once a fire reaches a certain size, fixed fire suppression systems may be the only means available to a ship’s crew to extinguish a fire in a machinery space. These systems must be maintained and inspected according to both industry guidelines and the manufacturers’ instructions. Knowledge of a system’s specific maintenance requirements is critical to vessel safety. Lower Lakes Towing (LLT) hired an external service provider to carry out the maintenance on the CO2 fixed fire suppression system, expecting that the technicians had expert knowledge regarding the system’s maintenance. This expectation was supported by the class approval certificate that the contractor had previously held. However, the technicians who performed the maintenance and inspection did not have manufacturer training for the system. As a consequence, maintenance tasks designed to detect and rectify some of the defects that caused the system to fail on the day of the occurrence were not carried out. For example, O-rings were missing from some of the cylinders and some of the discharge hoses had not been tightened. Consequently, the system was left in an unsafe state following the annual maintenance visit. The chief engineer and vessel manager were unaware of the maintenance tasks to be performed and so they were not able to ensure these tasks were being completed according to the manufacturer’s requirements during annual maintenance. Monthly inspection requirements from the manufacturer were not included in the vessel’s planned maintenance system or its firefighting equipment and training manual. In part because of this gap, subsequent monthly inspections by the crew failed to identify the loose hose fittings and loose connections at the discharge heads. As a result, the potential for leaks went undetected and the causes of the leaks were discovered only when the system was inspected after the fire during the investigation. Because technicians had performed maintenance on and inspected the vessel’s CO2 system, the crew believed that the system was ready for service and would be effective in suppressing the fire.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 67
Finding as to risk When individuals involved in inspection and maintenance of fixed fire suppression systems are unaware of the manufacturer’s instructions, deficiencies may not be identified and corrected, increasing the risk that these systems will fail in the event of a fire. Emergency systems are not intended to be regularly used and, for some, their activation in drills is simulated. Consequently, emergency systems require clear, concise, and highly functional instructions for successful use. In particular, CO2 system installations are engineered for each vessel and protected space; therefore, the instructions for use must be customized. Customizing instructions, including anticipating problems that may come up during use, requires an understanding of the system. The instructions must provide the steps to be taken to ensure that CO2 will be released into the protected space. During a local (manually activated) release, the steps taken should also minimize the risk of CO2 leaks that might affect the crew member performing the task. In this occurrence, the instructions for the local release of CO2 were adapted directly from the manufacturer’s instructions and were based on its example installation. However, to keep the path for the CO2 open from the cylinders to the engine room in the Cuyahoga’s installation, 2 steps should have been reversed: the directional stop valve should have been opened before the manifold was pressurized. Instead, the instructions specified that the manifold was to be pressurized first, which meant that the gas was blocked from entering the engine room distribution piping. Consequently, high-pressure, low-temperature CO2 was released into the cylinder room through the leaks in the cylinder heads. With the room full of CO2, the chief engineer was unable to reach the directional stop valve to open the path to the discharge delay device and the main stop valve for the engine room. Inspectors and auditors may verify that instructions exist, and that crew know where the instructions are.71 However, it is beyond the scope of most inspections and audits to verify the instructions themselves. It is the responsibility of the authorized representative to provide instructions and of crew to provide feedback on them. For emergency systems such as CO2 fixed fire suppression systems, where activation during drills is impracticable, it is especially important to simulate the use of the instructions to identify possible problems and make any needed changes. Finding as to risk If instructions for the operation of CO2 fixed fire suppression systems are not clear, detailed, and specific to the installation, there is a risk that such systems will not be successfully and safely operated in an emergency. Because of the hazards posed by CO2 stored under pressure in steel cylinders, the primary means of activating a CO2 system is by remote control. Protecting and routing the remote
71 For example, see TSB Marine Transportation Safety Investigation Report M20A0434.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 68 release cables is an important aspect of the system design. Industry guidance documents, such as classification society guidelines, identify a number of factors that affect successful operation, including the location where the cables are installed. To ensure that the cables do not degrade over time, they should be located in areas where they will not be subject to the effects of weather or corrosion. To ensure that they are not damaged by a fire, they should not be routed in exposed locations or in the protected space. In this occurrence, the remote release cables were subjected to the heat of the fire and made brittle by a reaction between the conduit and cable materials. Consequently, the cables broke when they were pulled. When the system was installed, the cables had been routed near the skylight hatch and above the main engine. In this location, however, they were also inside the protected space at a point where some of the highest temperatures in an engine fire were likely to occur. Finding as to causes and contributing factors The remote release cables for the fixed fire suppression system were located in an exposed location in the engine room and were damaged by the fire. Consequently, the cables failed and CO2 was not discharged into the engine room, requiring a crew member to attempt a local release. 2.2.2 Emergency fire pump isolation valve Operational tests of emergency equipment are 1 way of ensuring that it will work when needed. However, for components that are seldom used, or where the condition of internal components cannot be thoroughly assessed in operational tests, an important part of preventive maintenance is routine inspection. Although the crew occasionally performed operational tests of the emergency fire pump in fire drills, the monthly test of starting the pump and checking the discharge pressure could not provide an indication of the condition of the isolation valve. The internal condition of the valve could be observed only by removal and dismantling. Consequently, the corrosion of the isolation valve remained unidentified. Because there was some resistance on the spindle, it is likely that the crew member who last attempted to open the valve believed that the gate had opened. During the occurrence, the crew observed that there was no water in the fire main. Since the pump had previously become airlocked, and there was no other way to supply water for firefighting, the chief engineer entered the potentially hazardous unloading tunnel to work on the pump. The corrosion observed in the emergency fire pump isolation valve was the result of several years of use. In fact, the valve had reached the end of its life cycle. Because valves and piping may come into contact with water, they are subject to corrosion, which means they have to be occasionally repaired or replaced. The investigation determined that the guidance for the inspection and maintenance of fire main isolation valves in LLT’s SMS and Fire Fighting Equipment & Training manual was absent. In Lloyd’s Register’s master list of inspection items, inspection of fire main isolation valves is not included in the inspection of the
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 69
emergency fire pump. During this inspection, the emergency fire pump was opened, and the pump and its associated piping and fittings were examined. However, there were no records indicating that the valve had ever been opened for inspection since it was installed. Finding as to causes and contributing factors Unknown to the crew, an isolation valve in the fire main piping was corroded and it obstructed the flow of water to the fire main, preventing the use of water to confine the fire. 2.3 Emergency response and preparedness 2.3.1 Drills and procedures In an emergency, a narrowing of and focusing of attention can occur. This narrowing of and focusing of attention and an accompanying stress response can affect decision making, leading to decisions and actions being taken without an assessment of the risks involved. This focused attention can be desirable in certain situations, but it can come at the cost of potentially missing other pieces of information that could be important in managing emergency situations. Procedures, drills, and training are designed to support crew members in effectively managing emergency conditions, such as an absent or missing crew member in a fire. As with all types of emergency response, fire and abandon ship drills are most effective if there is a mix of • activity to develop automatic responses, such as donning firefighter outfits and self- contained breathing apparatuses (SCBAs) or confirming tasks are complete; and • a wide range of realistic scenarios that represent likely situations, to support decision making. Additionally, procedures, drills, and training should be carried out with the equipment that will be available in the emergency. Frequent practice with realistic scenarios provides experience in adjusting to problems or making rapid decisions in an emergency. For example, in this occurrence, crew members needed to make decisions about how to safely access the emergency fire pump when the usual means of access was blocked. The second engineer, who was named as the leader of the primary fire team, was absent for the first few minutes of the occurrence. His absence delayed some steps in the fire response. As well, the crew members who attempted to locate him did not notify others that they were entering the smoke-filled accommodations and neither of them wore a firefighter outfit or SCBA, putting themselves at additional risk. The Cuyahoga’s muster list assigned 3 crew members to don firefighter outfits for an engine room fire or a fire in a different location. However, only 2 firefighter outfits were available on the vessel. In this occurrence, 2 crew members donned the firefighter outfits. However,
TRANSPORTATION SAFETY BOARD OF CANADA ■ 70 the crew members who were the most active in the fire response were not wearing firefighter outfits or SCBAs. Other TSB investigations72 have found instances where muster lists were not based on a realistic assessment of an emergency response. Many recent TSB investigations have also found that a lack of varied scenarios in drilling has been a factor in the response to complex emergencies. Finding as to risk Realistic scenarios describe events that are likely to occur in an emergency, such as a missing crew member during an engine room fire. If such scenarios are not used for emergency drills, a crew will be less prepared to make rapid decisions, assess the results, and adjust actions accordingly. Accurate, vessel-specific emergency procedures help the crew develop a shared understanding of the fire emergency response, facilitating the coordination of effort. Without the support of such procedures, masters and senior officers are left to react to all aspects of a fire response while the emergency is occurring. As a result, the fire response may not be well coordinated, reducing the effectiveness of the fire response and increasing risks to crew members. Procedures should be vessel-specific and complete. For example, fire response procedures should define fire containment measures for different areas of the vessel, especially on a vessel such as the Cuyahoga where the forward and aft structures were widely separated. In this occurrence, the checklist for fires and explosions was not specific to the vessel and primarily described steps for reporting the emergency. Other procedures were high level (not specific to the vessel) or absent. Finding as to risk If vessel-specific instructions for fire response are missing or inadequate, there is a risk that the crew will be unable to respond effectively to a shipboard fire. 2.3.2 Firefighting personal protective equipment and training When a fire breaks out on a vessel, a prompt and coordinated firefighting response, carried out by trained personnel with appropriate equipment, is key to ensuring that the fire is brought under control and extinguished. In this occurrence, an insufficient number of equipped firefighters limited the crew’s ability to respond to the fire effectively and safely. For example, the decision to release CO2 into the engine room before the space was completely isolated was influenced by the knowledge that it was unnecessarily dangerous for 2 crew members to enter the aft superstructure or engine room without a backup team.
72 TSB marine transportation safety investigation reports M22C0231, M20A0003, and M19C0403.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 71
The 2 crew members who donned the 2 firefighter outfits on board the vessel did so according to the muster list; the engine room team did not don firefighter outfits or SCBAs. Consequently, the members of the engine room team were exposed to smoke and other hazards in responding to events. For example, the chief engineer retrieved the infrared thermometer from the smoke-filled accommodations without an SCBA. As well, the crew members attempting to troubleshoot the emergency fire pump entered the unloading tunnel unprotected. Previous TSB investigations73 have shown that the minimum level of required firefighting personal protective equipment may be inadequate. Finding as to risk If only the minimum required quantities of firefighting equipment are carried on board, then any response beyond activities such as monitoring and boundary cooling is likely to increase the risk to the crew. Firefighting training provided by recognized institutions is intended to enable crew to effectively respond to vessel fires safely, following best practices. Participants learn to work in coordinated teams to contain and fight fires. Vessel crew are not professional firefighters, and for most, Marine Emergency Duties (MED) training provides the sole basis for firefighting knowledge and experience. The lack of firefighting equipment on some vessels will prevent crew from putting into practice what they have learned. Gaps between what crew know how to do and what is possible to do in a real-life emergency due to limitations of available equipment prevent effective use of knowledge and experience gained during MED training. Also, if equipment does not fit the crew donning it, there is an increased risk of injury when entering an affected compartment. The TSB has found in other occurrences74 that the lack of access to adequate firefighting equipment prevented crews from safely carrying out combined and coordinated firefighting activities as taught in MED firefighting training courses. In this occurrence, the fire went out on its own before spreading outside the machinery space because the space was ventilated at the beginning of the occurrence and the fuel flow to the fire ceased quickly. However, the crew were not equipped to employ any of the firefighting knowledge and skills they had learned in MED training and that could have been needed if the fire had spread. Finding as to risk If crew only have access to the minimum quantity of firefighting equipment required by regulations, then they will be unable to safely use the firefighting knowledge and skills
73 TSB marine transportation safety investigation reports M20A0003 and M18P0014. 74 TSB marine transportation safety investigation reports M20A0003 and M19C0403.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 72 taught in MED training. Consequently, vessel firefighting and containment activities will be limited and risks to the crew increased.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 73
- 0
FINDINGS 3.1 Findings as to causes and contributing factors These are the factors that were found to have caused or contributed to the occurrence.
- The retaining clamps on the fuel injection lines were not in place, increasing the fuel
lines’ exposure to the effects of engine vibration.
- Rectifying the fuel injection line leaks was incorporated into routine maintenance tasks.
Consequently, there was no evaluation of the cause of the repeated leaks.
- Without accurate, documented procedures available to them, crew members developed
their own practices for managing fuel injection line leaks; this led to fittings not being adequately tightened to resist the vibration-loosening process. As a result, these deviations from the manufacturer’s instructions likely contributed to the loosening of the fittings.
- A fitting on a fuel injection return line loosened and disconnected, creating a fuel spray.
- Gaps in the insulation exposed hot surfaces on the exhaust gas piping at the
turbocharger outlet, and the fuel spray ignited on contact with those surfaces.
- The remote release cables for the fixed fire suppression system were located in an
exposed location in the engine room and were damaged by the fire. Consequently, the cables failed and carbon dioxide (CO2) was not discharged into the engine room, requiring a crew member to attempt a local release.
- Unknown to the crew, an isolation valve in the fire main piping was corroded and it
obstructed the flow of water to the fire main, preventing the use of water to confine the fire. 3.2 Findings as to risk These are the factors in the occurrence that were found to pose a risk to the transportation system. These factors may or may not have been causal or contributing to the occurrence but could pose a risk in the future.
- If personnel carrying out maintenance work do not have the most current
documentation issued by equipment manufacturers, safety updates and corrections will not be available for use. Consequently, poor equipment performance and breakdowns are more likely to occur, increasing the risk to the crew and to the vessel.
- If ventilation points and other openings to a compartment on fire cannot be accessed
and closed, there is a risk that efforts to control and extinguish the fire will be delayed or unsuccessful.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 74
- When individuals involved in inspection and maintenance of fixed fire suppression
systems are unaware of the manufacturer’s instructions, deficiencies may not be identified and corrected, increasing the risk that these systems will fail in the event of a fire.
- If instructions for the operation of CO2 fixed fire suppression systems are not clear,
detailed, and specific to the installation, there is a risk that such systems will not be successfully and safely operated in an emergency.
- Realistic scenarios describe events that are likely to occur in an emergency, such as a
missing crew member during an engine room fire. If such scenarios are not used for emergency drills, a crew will be less prepared to make rapid decisions, assess the results, and adjust actions accordingly.
- If vessel-specific instructions for fire response are missing or inadequate, there is a risk
that the crew will be unable to respond effectively to a shipboard fire.
- If only the minimum required quantities of firefighting equipment are carried on board,
then any response beyond activities such as monitoring and boundary cooling is likely to increase the risk to the crew.
- If crew only have access to the minimum quantity of firefighting equipment required by
regulations, then they will be unable to safely use the firefighting knowledge and skills taught in Marine Emergency Duties training. Consequently, vessel firefighting and containment activities will be limited and risks to the crew increased. 3.3 Other findings These findings resolve an issue of controversy, identify a mitigating circumstance, or acknowledge a noteworthy element of the occurrence.
- Following an earlier fire on board another Lower Lakes Towing Ltd. vessel, instructions
at the Cuyahoga’s remote CO2 release station were revised to give accurate information about how to confirm that a release was successful and describe post-release safety precautions.
- Certain regulations to mitigate fire risks did not apply to the Cuyahoga due to age-
related exemptions.
- Although the CO2 fixed fire suppression system was not discharged, the ventilation
through the skylight likely helped stop the fire from spreading, and the engine shutting down meant that the fuel flow to the fire ceased, allowing the fire to extinguish itself.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 75
- 0
SAFETY ACTION 4.1 Safety action taken 4.1.1 Lower Lakes Towing Limited During the repairs to the carbon dioxide (CO2) fixed fire suppression system, the remote cables between the engine room access door and the cylinder compartment were routed outside of the engine room along the deck and skylight on the boat deck. The instructions for operating the CO2 system controls were modified, directing the crew to operate the directional stop valve before operating the control heads on the cylinders. This report concludes the Transportation Safety Board of Canada’s investigation into this occurrence. The Board authorized the release of this report on 16 July 2025. It was officially released on 27 August 2025. Visit the Transportation Safety Board of Canada’s website (www.tsb.gc.ca) for information about the TSB and its products and services. You will also find the Watchlist, which identifies the key safety issues that need to be addressed to make Canada’s transportation system even safer. In each case, the TSB has found that actions taken to date are inadequate, and that industry and regulators need to take additional concrete measures to eliminate the risks.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 76 APPENDICES Appendix A – Manufacturer instructions for monthly inspections
6-3 INSPECTION PROCEDURES – MONTHLY
- Make a general inspection survey of all cylinders and equipment for damaged or
missing parts. If any equipment requires replacement, refer to Paragraph 6-7.
- Ensure that access to hazard areas, remote nitrogen or cable pull stations, discharge
nozzles, and cylinders are unobstructed and there are no obstructions to the operation of the equipment or distribution of carbon dioxide.
- Inspect flexible actuation hoses for loose fittings, damaged threads, cracks,
distortion, cuts, dirt and frayed wire braid. Tighten loose fittings. Replace hoses having stripped threads or other damage. If necessary, clean parts as directed in Paragraph 6-6.3. Inspect flexible actuation hose adapters for stripped threads and damage. Replace damaged adapters. Inspect couplings and tees for tightness. Tighten if necessary. Replace damaged parts.
- Inspect control heads attached to CO2 cylinders, nitrogen cylinders, stop valves and
time delays for physical damage, deterioration, corrosion, distortion, cracks, dirt, and loose couplings. Tighten loose couplings. Replace damaged or missing caps. Replace control head if damage is found. If necessary, clean as directed in Paragraph 6-6.3. Ensure that all control heads, actuation devices, etc. are all in the “set” or “closed” position with the locking pin installed and seal wire intact.
- Inspect carbon dioxide cylinder and valve assembly for leakage, physical damage
such as cracks, dents, distortion, and worn parts. Check safety disc for damage, and replace if necessary. If necessary, clean cylinder and associated parts as described in Paragraph 6-6.3.
- Inspect cylinder straps, cradles, and attaching hardware for loose, damaged, or
broken parts. Check straps and associated parts for corrosion, oil, grease, grime, etc. Tighten loose hardware. Replace damaged parts. If necessary, clean as directed in Paragraph 6-6.3.
- Inspect CO2 system discharge heads for cracks, corrosion, grime, etc. Ensure that
discharge heads are tightly secured to each CO2 cylinder valve and connected to the discharge manifold with a flexible discharge hose or swivel adapter.
- Inspect flexible discharge hoses for loose fittings, damaged threads, cracks, rust,
kinks, distortion, dirt, and frayed wire braid. Tighten loose fittings, and replace hoses which have stripped threads. If necessary, clean as directed in Paragraph 6- 6.3.
- Inspect discharge manifold for physical damage, corrosion, and dirt. Inspect
manifold support brackets and clamps for looseness and damage. Inspect check and
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 77
stop valves, where applicable, for deformation, leakage, cracks, wear, corrosion, and dirt. Secure loose parts. Replace damaged parts. If necessary, clean as directed in Paragraph 6-6.3.
- Inspect discharge nozzles for dirt and physical damage. Replace damaged nozzles. If
nozzles are dirty or clogged, refer to Paragraph 6-6.4. Where frangible discs are used, ensure they are intact and clean. Look for holes or cuts. Broken discs will allow vapors, oils, etc. from the hazard to enter into the nozzles and system piping and seriously effect [sic] or block system discharge. CAUTION Do not paint nozzle orifices. The part number of each nozzle is stamped on the nozzle. Nozzles must be replaced by nozzles of the same part number. Nozzles must never be interchanged, since random interchanging of nozzles will adversely affect proper CO2 distribution within a hazard area.
- Inspect pressure switches for deformations, cracks, dirt or other damage. Replace
switch if damage is found.
- Check nitrogen cylinder pressure gauge for proper operating pressure. If pressure
loss (adjusted for temperature) exceeds 10%, recharge with nitrogen to 1800 PSIG at 70°F. See Figure 6-1 for pressure-temperature relationship.
- Inspect lock-out valve (if installed). Valve must be secured and locked in the “open”
position.
- Visually inspect Control Panel/Detection system. Ensure that system is “normal”
and free from any “alarm” or “trouble” signals.
- If any defects are found during the monthly inspection, immediately contact a Kidde
Fire Systems Distributor to service the systems. Kidde Fire Systems (P/N 81-CO2MAN-001), Engineered Carbon Dioxide (CO2) Fire Suppression Systems: Design, Installation, Operation and Maintenance Manual (September 2013), Section 6.3. Monthly inspection procedures vary slightly between different versions of the manual, as one would expect.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 78 Appendix B – Similar occurrences Transportation Safety Board of Canada M21A0041 (Atlantic Destiny) – On 02 March 2021, the fishing vessel Atlantic Destiny, with 31 persons on board, sustained a catastrophic engine failure while the vessel was about 120 nautical miles south of Yarmouth, Nova Scotia. In this occurrence, the vessel’s carbon dioxide (CO2) fixed fire suppression system was used during the response, but crew members re-entered the space after 30 to 40 minutes, reintroducing oxygen before the space had cooled. The Board was concerned that there is insufficient crew knowledge of the necessary pre- and post-release stages in the use of CO2 fixed fire suppression systems. M20A0003 (Newfoundland Lynx) – On 29 January 2020, the fishing vessel Newfoundland Lynx reported a fire in the sauna. There were some difficulties with the firefighter outfits and self-contained breathing apparatuses (SCBAs). The vessel’s crew managed to extinguish the fire. The Board issued a safety message stating that it is important that crews perform fire drills on a regular basis to confirm that firefighting equipment is in working order, and to reinforce their knowledge of how to use the equipment and of the assigned emergency duties. It is also important that these drills include varied and realistic scenarios so that crews are prepared to respond effectively to emergencies. M19C0403 (Tecumseh) – On 15 December 2019, the bulk carrier Tecumseh sustained a fire in the engine room while transiting the Detroit River off Windsor, Ontario. The TSB investigation determined that the fire was caused by maintenance issues in the engine room. M18P0403 (MOL Prestige) – On 31 January 2018, the container vessel MOL Prestige sustained a fire in the engine room, 146 nautical miles south-southwest of Haida Gwaii, British Columbia (BC). The TSB investigation determined that the fire was caused by maintenance issues in the engine room. Also, the vessel’s CO2 fixed fire suppression system failed due to leaks. M16P0241 (Ken Mackenzie) – On 11 July 2016, the tug Ken Mackenzie sustained a fire in the engine room while transiting the Fraser River in BC. The TSB investigation determined that the fire was caused by maintenance issues in the engine room of the vessel. U.S. National Transportation Safety Board In the U.S., there have been several investigations into fires caused by hot surface ignition. Between 2018 and 2022, the U.S. National Transportation Safety Board (NTSB) investigated
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M23C0104 ■ 79
10 occurrences of engine room fires where contact between liquid fuel and the hot surfaces of diesel engines was determined to be the probable cause, including the following: DCA22FM016 (Endo Breeze) – On 29 April 2022, a fire broke out in the engine room of the chemical tanker Endo Breeze while it was departing from New Jersey. The investigation determined that the probable cause was a high-pressure fuel spray from a fuel injection pump of 1 of the vessel’s main engines that ignited on an engine exhaust component. In its report, the NTSB noted that it has investigated several casualties involving failures of fuel line fittings that led to fires. The report emphasized the importance of following manufacturer assembly procedures during fuel system maintenance and the need to review manufacturers’ manuals and guidance regularly. DCA22FM002 (Capt. Kirby Dupuis) – On 09 November 2021, a fire broke out in the engine room of the towing vessel Capt. Kirby Dupuis while pushing barges on the Ohio River in Kentucky. The investigation determined that the probable cause was a lube oil tube on the port main engine that had vibrated out of a joint due to a missing retaining ring and mounting bracket, spraying pressurized oil that contacted a hot exhaust surface and ignited. DCA21FM026 (President Eisenhower) – On 28 April 2021, a fire broke out in the engine room of the container ship President Eisenhower while it was navigating 17 nautical miles southwest of California. The investigation determined that the probable cause was the spray of fuel oil from a main engine return line onto a nearby unshielded and uninsulated engine exhaust component, and that a fitting had been improperly tightened when installed. Other international accident investigation boards Some international investigations also reported problems with the CO2 fixed fire suppression system. United Kingdom Marine Accident Investigation Board Report 16/2018 (Eddystone and Red Eagle) – On 08 June 2016, the roll-on, roll-off cargo vessel Eddystone experienced an unintentional release of CO2 from its fixed fire suppression system while on passage in the southern Red Sea. A similar incident took place on 17 July 2017 on board the roll-on, roll-off passenger ferry Red Eagle while on passage from the Isle of Wight to Southampton. In both cases, the engine room distribution valve for the CO2 gas remained closed and gas leaked out into the compartment where the CO2 cylinders were stored. The United Kingdom Maritime Accident Investigation Board concluded that the level of service given by service providers regularly failed to maintain the safety of CO2 fixed fire extinguishing systems on vessels.
FD06122 | 2023_加拿大运输安全委员会_凯霍加机舱起火_M23C0104_火灾报告(英文).md
分类:06_境外及港澳台调查报告 | 年份:2023 | 地域: | 严重程度: | 场所: | 起火原因:燃气/爆炸 | 来源格式:md
1. 标题与报告编号
- 标题:Marine transportation safety investigation report Cuyahoga — Engine room fire
- 报告编号:M23C0104
2. 机构与发布日期
- 机构:Transportation Safety Board of Canada(TSB)
- 事故日期:2023 年 5 月 23 日
3. 事故摘要
- 日期/地点:2023 年 5 月 23 日;Lake Erie, off Kingsville, Ontario
- 事件:自卸散货船 Cuyahoga(20 人)"在 Lake Erie 北行时机舱起火"。火起于主机 7、8 缸间顶部。船员关闭速闭燃油阀,尝试 CO₂ 固定灭火(远程与本地点均失败)。船舶锚泊;主机停后火灭。无伤亡或污染。
4. 原因 / 发现
- 7 缸燃油回油管脱落 → 喷出船用柴油;"所有燃油喷射管固定夹均缺失"(2021 拆除)。
- 开裂环氧垫块与先前不对中致过度振动。
- CO₂ 远程钢缆"被火损(液态金属脆化)";本地点仅向缸室释放,1800 kg 全释于缸室而非机舱。
- 应急消防泵隔离阀"卡在关闭位"(阀杆脱开)。
- 天窗未关且无远程关闭。
- 仅最低 2 套消防服/SCBA——"不足以应对机舱火灾"。
- 维护缺口:未采用制造商扭矩更新(45 vs 65 N·m)、第三方技师未受训、缺陷未记录。
5. 安全行动
- TSB 发布发现(如早前 LLT 火灾后修订 CO₂ 指示)。
- 报告强调:燃油管适当屏蔽、检查支座/垫块、船员熟悉 CO₂ 本地/远程顺序、验证隔离阀、按制造商月度船员检查。
- LLT 自愿 SMS;建议报告技术不符与险情(如反复燃油泄漏)。
- TSB 不分配责任,未发强制监管行动。
FD06123 | 2024_加拿大_TSBC_M24A0269_Fire_Abandonment_Fishing_Vessel_Elite_Navigator_2024.pdf
分类:06_境外及港澳台调查报告 | 年份:2024 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M24A0269 FIRE AND ABANDONMENT Fishing vessel Elite Navigator 130 nautical miles east-northeast of Fogo Island, Newfoundland and Labrador 17 July 2024 The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. This report is not created for use in the context of legal, disciplinary or other proceedings. See the Terms of use at the end of the report. Description of the vessel The Elite Navigator (Transport Canada official number 823767) was a fishing vessel built in 2000 (Figure 1). It had a length overall of 16.74 m and a gross tonnage of 69.77. The vessel was built primarily for crab fishing, but was later adapted to fish turbot using gillnets. At the time of the occurrence, the vessel was certified by Transport Canada (TC) to operate up to 200 nautical miles (NM) from shore between 01 April and 30 November.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 2
Figure 1. The Elite Navigator (Source: Third party, with permission) The vessel’s hull was constructed of moulded fibreglass. The superstructure was of a stepped design, with the deckhouse located forward of amidships and the wheelhouse raised above the forecastle deck forward. The superstructure was constructed of wood covered with fibreglass. The area below the main deck was divided into 4 compartments (from forward): the forecastle, the engine room, the fish hold, and the lazarette. The exhaust trunking, which contained piping for the engine room exhaust, passed through the aft portion of the deckhouse. The vessel carried 7 life jackets and 7 immersion suits; some were stored in the forecastle and some in a locker in the wheelhouse. The vessel also had two 8-person inflatable life rafts stored in cradles on top of the wheelhouse. The life rafts were fitted with hydrostatic releases and were connected to the vessel by painters. The life rafts were each equipped with paddles as well as an emergency pack that included water, sugar biscuits, flares, thermal protective aids, a sponge, and a bailer. History of the voyage On 08 July 2024, the Elite Navigator, with the master and 6 crew members on board, departed Valleyfield, Newfoundland and Labrador, to fish turbot. By 17 July, the vessel had caught its
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M24A0269 ■ 3 quota. At approximately 1830,1 the master used a satellite messenger2 to notify the owner that they were on the way to port to land their catch and that their estimated arrival time was 1430 on 18 July. At this time, the vessel was about 137 NM east-northeast of Fogo Island (Figure 2). Figure 2. Area of the occurrence (Source: TSB)
At approximately 1930, an alarm sounded in the wheelhouse. The master checked the alarm panel and determined that it was from a smoke detector in the engine room. The master looked at the video camera that monitored the engine room, but there was no smoke visible. The master then went to one of the engine room access hatches in the deckhouse and proceeded partway down a ladder into the engine room to check for smoke. Light smoke was now visible. Shortly after, a crew member in the deckhouse yelled that there was a fire in the exhaust trunking (Figure 3).
1 All times are Newfoundland Daylight Time (Coordinated Universal Time minus 2.5 hours). 2 Satellite messengers are small portable devices that typically allow for 2-way text messaging and route tracking. They work through commercial satellite networks and have wide coverage, in some cases worldwide.
TRANSPORTATION SAFETY BOARD OF CANADA ■ 4
Figure 3. Photo of exhaust trunking taken in 2020 (Source: Third party, with TSB annotations)
Another crew member grabbed a dry powder fire extinguisher and tried to extinguish the fire through the interior doorway to the exhaust trunking. Meanwhile, the master returned to the wheelhouse and shut down the main engine. The master and one of the crew members then went outside on the main deck and pried the exhaust trunking vent off the back of the deckhouse to get access to the other side of the exhaust trunking (Figure 4). From here, they continued to try to fight the fire with another extinguisher.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M24A0269 ■ 5 Figure 4. Aft view of the Elite Navigator from a voyage in 2022 showing exhaust trunking vent as well as other relevant locations and equipment (Source: Fisheries and Oceans Canada, with TSB annotations) The attempts to fight the fire with the extinguishers were not successful, and the master told the crew to prepare to abandon ship. He instructed them to get the immersion suits from the wheelhouse and bring them to the muster station on the aft portion of the main deck. The master returned to the wheelhouse and activated the digital selective calling (DSC) button on the vessel’s very high frequency (VHF) radiotelephone to send a distress signal. He watched the VHF-DSC count down and heard it beep, indicating that the distress signal was sent successfully. He then made 2 Mayday calls by voice over the VHF radiotelephone. The master then went to the top of the wheelhouse and threw the 2 life rafts into the water. In the meantime, one of the crew members grabbed 5 immersion suits, the most he could carry, from the wheelhouse and brought them to the muster station. He donned an immersion suit and proceeded to the top of the wheelhouse to inflate the starboard life raft by pulling the painter. Two of the crew members became trapped forward as the fire grew, and they were unable to go aft to the muster station. One of these crew members sent another Mayday call by voice over the VHF radiotelephone. The 2 trapped crew members then tried to retrieve immersion suits and life jackets from the wheelhouse but were unable to do so because of smoke and fire. They exited the wheelhouse to the bow. After donning immersion suits, the master and the 4 other crew members jumped into the water. The wave heights were 1 to 3 m, and the visibility was poor with patchy fog. The master and 2 crew members swam to the life raft and boarded it, while 2 crew members (Crew A and Crew B) stayed in the water in their immersion suits. Crew A held onto the life raft and helped manoeuvre
TRANSPORTATION SAFETY BOARD OF CANADA ■ 6
it by kicking, while Crew B swam to the bow where the remaining 2 crew members were stranded without immersion suits or life jackets. One of the crew members on the bow jumped into the water. Crew B pulled him over to the life raft, and the master and crew members pulled him on board. Crew B then swam back to the bow and the other crew member on the bow jumped into the water. Using the life raft’s painter, Crew B pulled him over to the life raft and both of them boarded it. One of the crew members in the life raft then cut the painter to release the life raft from the burning vessel. At this time, embers from the vessel fire were burning holes in the life raft’s canopy. At approximately 1938, the master and crew members began manoeuvring the life raft away from the burning vessel. As the life raft began to move away, Crew A was pulled on board. The other life raft, which was uninflated, was visible drifting away from the Elite Navigator. The master and crew members tried to paddle to retrieve it but could not reach it. Shortly after, the Elite Navigator and the uninflated life raft drifted out of view. Approximately 6.5 hours later, the life raft with the master and crew members on board drifted back in sight of the burning vessel. At this time, the superstructure and deck were completely burnt. The vessel sank shortly thereafter. At 1521 on 18 July, the owner, concerned because the vessel was overdue and there had been no recent communication or social media activity from the master or crew, called Marine Communications and Traffic Services (MCTS) to report the situation. MCTS attempted to contact the Elite Navigator on VHF and medium frequency (MF) radiotelephone but was unsuccessful in reaching the vessel. MCTS determined that there had been no signal from the vessel’s automatic identification system since 2030 on 17 July. The Joint Rescue Coordination Centre was notified and, at 1535 on 18 July, resources from the Canadian Coast Guard and Department of National Defence were deployed. On 19 July, after more than 50 hours in the life raft, the master and crew saw a helicopter and the lights of a vessel nearby and set off their last flare. The helicopter spotted the life raft and shortly after, at 2328, the Canadian Coast Guard ship Teleost rescued everyone from the life raft. All 7 on board survived with only minor injuries. Cause of the fire The Elite Navigator was not recovered, so it was not possible to determine the exact cause of the fire. The fire was first identified in the exhaust trunking, which contained piping for the main engine and generator exhaust. The exhaust trunking measured approximately 120 cm by 60 cm and was located on the vessel’s centreline, just forward of the aft bulkhead in the deckhouse. It was constructed of wood, and the interior bulkheads were covered by painted plywood, which is not fire resistant. Design of carbon dioxide fixed fire suppression systems on fishing vessels The Elite Navigator’s engine room was fitted with a carbon dioxide fixed fire suppression system (CO2 system). CO2 is non-flammable and non-conductive and is often used for fire suppression in
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M24A0269 ■ 7 engine rooms. When applied to a fire, CO2 provides a heavy blanket of gas that displaces oxygen to a point where combustion cannot occur. Any openings to the engine room space must be sealed before the CO2 is released. Because fires can grow rapidly, it is important these openings can be sealed quickly. In this occurrence, the CO2 system was not used because the fire was in the exhaust trunking and it was not clear to the crew whether the system would be able to extinguish a fire in that location. In the course of collecting data about the CO2 system on the Elite Navigator, the investigation identified that the vents on the deckhouse top were not fitted with covers or shutters. This meant that there was no way to quickly seal the engine room for the release of CO2. The vessel did have removeable shutters that could be installed to close the vents; however, locating and installing these shutters could take time that may not be available in an emergency. The CO2 system on the Elite Navigator had been fitted on the vessel voluntarily; it was not required by regulation. There are many other fishing vessels under 24 m like the Elite Navigator that are similarly equipped with voluntarily fitted systems. Because TC does not require these systems on small fishing vessels, there are no specific regulations covering them. While the Fishing Vessel Safety Regulations do broadly require machinery and equipment to be maintained in a safe operating condition,3 the regulations do not provide any specifics about CO2 systems. When TC inspectors board fishing vessels to do inspections, they therefore have no procedure with which to verify CO2 systems for compliance. TC inspectors may visually verify the overall condition of the systems during inspections and, if requested by the authorized representative, check the maintenance records for the system. Distress notification When a vessel’s crew needs to abandon ship, their survival often depends on transmitting a distress signal that reaches search and rescue resources. The Elite Navigator carried a number of distress alerting devices, each of which had different capabilities, as described in Table 1.
3 Transport Canada, C.R.C., c. 1486, Fishing Vessel Safety Regulations (as amended 20 December 2023), subsection 3.04(1).
TRANSPORTATION SAFETY BOARD OF CANADA ■ 8
Table 1. Distress alerting devices carried on the Elite Navigator and their capabilities Distress alerting device Required by regulation Capabilities VHF radiotelephone Yes Can be used to make a distress call by voice. The typical maximum range for voice communications is between 10 to 60 NM depending on factors such as available power and height of the antenna. VHF-DSC Yes When the DSC button is pushed for the prescribed time, a digital distress signal is sent to ship and shore stations within range. A DSC’s functional range is typically 25% further than voice communications sent by VHF radiotelephone. MF radiotelephone Yes Can be used to make a distress call by voice. The typical maximum range for voice communications is between 100 to 150 NM. Emergency position- indicating radio beacon Yes Automatically sends a distress signal if fitted with a float-free mechanism and submerged. The distress signal is transmitted through satellites and has wide coverage, in most cases worldwide. Can also be activated manually. Pyrotechnic devices* Yes Can be used to generate visual signals that alert others within sight of distress. Common types include rocket parachute flares, multi-star flares, hand-held flares, and smoke signals. Visual distress signals are only effective when someone is in a position to see them. Commercially- available satellite communication devices (satellite phone and satellite messenger) No Satellite phones and messengers can be used for 2-way communication. Satellite phones allow for voice communication, whereas satellite messengers allow for text messaging. Satellite messengers also typically allow route tracking and manual distress signals, among other things. Both devices work on commercial satellite systems and have wide coverage, in some cases worldwide. Cellphone No Can be used for 2-way communication, but may have limited coverage at sea due to the distance and characteristics of the nearest cell tower. In 2024, cellular airborne sensors were installed on some SAR aircraft.[1] If such an aircraft is within range of a cellphone, the rescue crew can detect its location and text or call the phone. This is only possible if the phone number is known and the phone is capable of sending and receiving calls.
- Both the vessel and the life raft carried various pyrotechnic devices.
[1] National Defence, Cellular Airborne Sensor for Search and Rescue (CASSAR), at https://www.canada.ca/en/department- national-defence/corporate/transparency/access-information-privacy/privacy-impact-assessment/cellular-airborne- sensor-for-search-rescue.html (last accessed 25 February 2025). In this occurrence, in the limited amount of time available before the crew abandoned ship, distress calls were made using the vessel’s VHF radiotelephone and VHF-DSC. VHF-DSC is required on many vessels4 and is a well-known distress alerting device. Training for the Radio Operator Certificate – Maritime Commercial, which the master had taken, is focused on VHF communications, and the master naturally went to the VHF radiotelephone to make distress calls.
4 Transport Canada, SOR/2020-216, Navigation Safety Regulations, 2020 (as amended 20 December 2023), subsection 204(1).
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M24A0269 ■ 9 However, because the vessel was approximately 130 NM from shore, beyond the range of VHF and VHF-DSC, it was not possible for these calls to reach MCTS stations directly. There was a chance that the voice calls might have reached other vessels, but there was no indication that they did. MF radiotelephones have a greater maximum range than VHF and VHF-DSC devices, at approximately 100 to 150 NM, which increases the potential that the distress call will be received by other vessels or by MCTS stations. The Elite Navigator also had an emergency position-indicating radio beacon (EPIRB) located on top of the deckhouse. The EPIRB could be activated manually or automatically by submersion in water. The EPIRB did not send a signal, likely because it was damaged by the fire. The EPIRB was not manually activated because the crew were focused on other emergency duties. TSB Watchlist The Watchlist identifies the key safety issues that need to be addressed to make Canada’s transportation system even safer. Commercial fishing safety has been on the Watchlist since 2010. The issue of commercial fishing safety will remain on the Watchlist until there are sufficient indications that a sound safety culture has taken root throughout the industry and in fishing communities across the country. TSB investigations often find evidence of weak safety cultures on commercial fishing vessels; however, in the case of the Elite Navigator, the vessel carried more safety equipment than was required by regulation, and the master and crew members were in the practice of talking through emergency scenarios and responses. They also demonstrated concepts from safety training during the occurrence, in particular their use of lifesaving equipment. Safety messages If fishing vessels are fitted with CO2 systems, it is important that these systems be designed optimally for emergencies. For example, the ventilation to the engine room must be able to be sealed quickly. The survival of the crew in an abandonment situation often depends on successfully transmitting a distress signal to search and rescue resources. For this reason, it is important that mariners be familiar with the capabilities of different distress alerting devices so they can use the most appropriate device for the scenario. Having emergency equipment available, and ensuring that the crew are familiar with its use, contributes to survival in an emergency. This report concludes the Transportation Safety Board of Canada’s investigation into this occurrence. The Board authorized the release of this report on 26 February 2025. It was officially released on 12 March 2025. Visit the Transportation Safety Board of Canada’s website (www.tsb.gc.ca) for information about the TSB and its products and services. You will also find the Watchlist, which identifies the key safety issues that need to be addressed to make Canada’s transportation system even safer. In each case, the TSB has found that actions taken to date are
TRANSPORTATION SAFETY BOARD OF CANADA ■ 10
inadequate, and that industry and regulators need to take additional concrete measures to eliminate the risks.
MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M24A0269 ■ 11
ABOUT THIS INVESTIGATION REPORT This report is the result of an investigation into a class 4 occurrence. For more information, see the Policy on Occurrence Classification at www.tsb.gc.ca The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. TERMS OF USE Use in legal, disciplinary or other proceedings The Canadian Transportation Accident Investigation and Safety Board Act states the following: • 7(3) No finding of the Board shall be construed as assigning fault or determining civil or criminal liability. • 7(4) The findings of the Board are not binding on the parties to any legal, disciplinary or other proceedings. Therefore, the TSB’s investigations and the resulting reports are not created for use in the context of legal, disciplinary or other proceedings. Notify the TSB in writing if this investigation report is being used or might be used in such proceedings. Non-commercial reproduction Unless otherwise specified, you may reproduce this investigation report in whole or in part for non-commercial purposes, and in any format, without charge or further permission, provided you do the following: • Exercise due diligence in ensuring the accuracy of the materials reproduced. • Indicate the complete title of the materials reproduced and name the Transportation Safety Board of Canada as the author. • Indicate that the reproduction is a copy of the version available at [URL where original document is available]. Commercial reproduction Unless otherwise specified, you may not reproduce this investigation report, in whole or in part, for the purposes of commercial redistribution without prior written permission from the TSB. Materials under the copyright of another party Some of the content in this investigation report (notably images on which a source other than the TSB is named) is subject to the copyright of another party and is protected under the Copyright Act and international agreements. For information concerning copyright ownership and restrictions, please contact the TSB. Citation Transportation Safety Board of Canada, Marine Transportation Safety Investigation Report M24A0269 (released 12 March 2025). Transportation Safety Board of Canada 200 Promenade du Portage, 4th floor Gatineau QC K1A 1K8 819-994-3741; 1-800-387-3557 www.tsb.gc.ca communications@tsb.gc.ca © His Majesty the King in Right of Canada, as represented by the Transportation Safety Board of Canada, 2025 Marine transportation safety investigation report M24A0269 Cat. No. TU3-12/24-0269E-PDF ISBN 978-0-660-76001-8 This report is available on the website of the Transportation Safety Board of Canada at www.tsb.gc.ca Le présent rapport est également disponible en français.
FD06124 | 2024_加拿大运输安全委员会_塞斯纳_421C右发动机起火撞后火灾_A24P0074_火灾报告(英文).md
分类:06_境外及港澳台调查报告 | 年份:2024 | 地域: | 严重程度: | 场所: | 起火原因:燃气/爆炸 | 来源格式:md
1. 报告标题与报告编号
- 标题:Air transportation safety investigation A24P0074
- 报告编号:A24P0074
2. 机构与发布日期
- 机构:Transportation Safety Board of Canada(TSB)
- 发布日期:2026 年 3 月 12 日
3. 事故摘要
- 日期:2024 年 7 月 18 日
- 地点:Tofino/Long Beach Airport (CYAZ), British Columbia
- 航空器:私人注册 Cessna 421C,注册号 N264DC
- 事件:该机从 Tofino/Long Beach 机场起飞前往 Portland International Airport, Oregon,载 1 名飞行员与 2 名乘客。起飞后不久右发动机起火。返场过程中,飞机在机场范围内 与地形相撞(collided with terrain)。撞击后立即发生 爆炸与撞后火灾(explosion and post-crash fire) 吞没飞机。应急定位发射机未激活。1 名乘客经左后出口撤离;飞行员与另 1 名乘客遇难。飞机被火焚毁。
4. 原因 / 因果因素
- 本调查为 class 4(class 4 investigations 不含 findings 或 recommendations),最终报告分析有限,无原因/因果因素章节。
5. 安全发现
- class 4 调查,不含安全发现。
6. 安全建议 / 纠正行动
- class 4 调查,不含建议。
FD06125 | 2016_西班牙_MITECO_森林火灾年报_火灾报告.pdf
分类:06_境外及港澳台调查报告 | 年份:2016 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
Los Incendios Forestales en España
BRIF Laza realizando ataque directo con apoyo de helicóptero el 19 de julio de 2016 en el incendio de Monterrei (Orense)
1 enero – 31 diciembre 2016 Avance Informativo
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016 AVANCE INFORMATIVO
1
Índice
- Antecedentes ................................................................................................ 2
- 1 Objeto del informe ............................................................................................. 2
- 2 Marco Legal ....................................................................................................... 2
- El programa de Ministerio de Agricultura y Pesca, Alimentación y Medio
Ambiente (MAPAMA) para la defensa contra los incendios forestales ....... 3 2.1 Actuaciones de Coordinación y Planificación ................................................ 3 2.1.1 Comisión Paritaria, Ministerio de Defensa – Ministerio de Agricultura y Pesca, Alimentación y Medio Ambiente ............................................................................................ 3 2.1.2 Comité de Lucha contra Incendios Forestales (CLIF).................................................. 3 2.1.3 Centro de Coordinación de la Información Nacional sobre Incendios Forestales (CCINIF) ................................................................................................................................ 5 2.2 Actuaciones de Prevención .............................................................................. 6 2.2.1 Formación en defensa contra incendios forestales...................................................... 6 2.2.2 Equipos de Prevención Integral (EPRIF) ..................................................................... 6 2.2.3 Brigadas de Labores Preventivas (BLP) ...................................................................... 7 2.3 Actuaciones de Extinción ................................................................................. 7 2.3.1 Medios humanos: Brigadas de Refuerzo en Incendios Forestales (BRIF) .................. 7 2.3.2 Medios aéreos: aviones anfibios, helicópteros bombarderos, helicópteros de transporte .............................................................................................................................. 9 2.4. Cooperación Internacional ............................................................................ 12
- Daños producidos en 2016 por los incendios forestales ....................... 12
- 1 Número de incendios y superficies afectadas .............................................. 12
- 2 Grandes Incendios Forestales (GIF) .............................................................. 15
- Anexos ........................................................................................................ 17
- 1 Avance estadístico Incendios Forestales (1 enero al 31 de diciembre) ...... 17
- 2. Distribución de los medios del MAPAMA 2016 ............................................ 19
- 3. Actividad de los medios del MAPAMA 2016 ................................................. 23
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016 AVANCE INFORMATIVO
2
- Antecedentes
- 1 Objeto del informe
Este informe constituye el avance estadístico de incendios forestales del año 2016. Recoge las actuaciones realizadas por el Ministerio de Agricultura y Pesca, Alimentación y Medio Ambiente (MAPAMA) en la defensa contra incendios forestales así como las condiciones de peligro y la ocurrencia de incendios registrada durante el periodo comprendido desde el 1 de enero al 31 de diciembre del año 2016. El objeto de este documento es proporcionar la información más actualizada a los miembros del Comité de Lucha contra los Incendios Forestales (CLIF), la Comisión Interministerial de Coordinación para la Prevención y Lucha contra los Incendios Forestales, los servicios administrativos autonómicos competentes y el público en general. Está disponible para su consulta en el siguiente enlace ubicado en la página Web del MAPAMA, junto con las memorias estadísticas de los incendios forestales sucedidos en España desde 1968. http://www.mapama.gob.es/es/desarrollo-rural/estadisticas/Incendios_default.aspx
- 2 Marco Legal
El Ministerio de Agricultura y Pesca, Alimentación y Medio Ambiente desarrolla sus actuaciones en la defensa y lucha contra los incendios forestales, bajo el marco legal establecido por las siguientes disposiciones: Ley 43/2003, de 21 de noviembre, de Montes. Real Decreto-Ley 11/2005, de 22 de julio, por el que se aprueban medidas urgentes en materia de incendios forestales. Acuerdo del Consejo de Ministros de 7 de octubre de 2005 por el que se crea la Unidad Militar de Emergencias. Ley 10/2006, de 28 de abril, por la que se modifica la Ley 43/2003, de 21 de noviembre, de Montes. Real Decreto 1424/2008, de 14 de agosto, por el que se determinan la composición y las funciones de la Comisión Estatal para el Patrimonio Natural y la Biodiversidad, se dictan las normas que regulan su funcionamiento y se establecen los comités especializados adscritos a la misma. Ley 3/2010, de 10 de marzo, por la que se aprueban medidas urgentes para paliar los daños producidos por los incendios forestales y otras catástrofes naturales ocurridos en varias Comunidades Autónomas. Real Decreto 1097/2011, de 22 de julio, por el que se aprueba el Protocolo de Intervención de la Unidad Militar de Emergencias. Real Decreto 401/2012, de 17 de febrero, por el que se desarrolla la estructura orgánica básica del Ministerio de Agricultura, Alimentación y Medio Ambiente.
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016 AVANCE INFORMATIVO
3
Real Decreto 893/2013, de 15 de noviembre, por el que se aprueba la Directriz básica de planificación de protección civil de emergencia por incendios forestales. Resolución de 31 de octubre de 2014, de la Subsecretaría, por la que se publica el Acuerdo del Consejo de Ministros de 24 de octubre de 2014, por el que se aprueba el Plan Estatal de Protección Civil para Emergencias por Incendios Forestales. Ley 21/2015, de 20 de julio, por la que se modifica la Ley 43/2003, de 21 de noviembre, de Montes.
- El programa de Ministerio de Agricultura y Pesca, Alimentación
y Medio Ambiente (MAPAMA) para la defensa contra los incendios forestales 2.1 Actuaciones de Coordinación y Planificación
Comprende las acciones de coordinación técnica realizadas en 2016 por este departamento junto con las diferentes administraciones públicas competentes en la defensa y lucha contra los incendios forestales.
- 1.1 Comisión Paritaria, Ministerio de Defensa – Ministerio de
Agricultura y Pesca, Alimentación y Medio Ambiente
Durante el año 2016 se celebraron dos reuniones de la Comisión Paritaria encargada de coordinar las necesidades de operatividad, mantenimiento y disponibilidad de los aviones Canadair operados por el 43 Grupo de las Fuerzas Aéreas. Se celebraron sendas reuniones, el 9 de febrero y 2 de diciembre respectivamente, para acordar el despliegue de los aviones, así como analizar aspectos de la campaña 2016.
- 1.2 Comité de Lucha contra Incendios Forestales (CLIF)
Es el Comité técnico para la coordinación entre las administraciones competentes en la defensa contra los incendios forestales, está presidido por el Subdirector General de Silvicultura y Montes del MAPAMA y se reúne dos veces al año, antes y después de la campaña estival. El 1 de junio de 2016 tuvo lugar la reunión de pre-campaña del CLIF en las instalaciones del Centro Nacional de Capacitación Agraria (CENCA), en San Fernando de Henares (Madrid). En dicha reunión se abordaron los siguientes asuntos: o Intervención de la Agencia Estatal de Seguridad Aérea para informar sobre el balance de la campaña de 2015.
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016 AVANCE INFORMATIVO
4
o Intervención de la Comisión de Investigación de Accidentes e Incidentes de Aviación Civil (CIAIAC) sobre el estado de la investigación de los accidentes en incendios forestales. o Medios de extinción de las comunidades autónomas y la Administración General del Estado en la campaña 2016. o Información sobre los Grupos de Trabajo del CLIF. o Plataforma de seguimiento de incendios y medios aéreos: proyecto HERMES. o Cursos formación del Área de Defensa contra Incendios Forestales. o Codificación de los medios y de las Brigadas de Refuerzo contra Incendios Forestales (BRIF). o Coordinación de actividades empresariales. Asimismo el día 12 de diciembre de 2016 tuvo lugar la reunión post-campaña del CLIF en las instalaciones del CENCA, en la que se trataron los siguientes asuntos: o Información sobre los grupos de trabajo del CLIF: o Grupo de trabajo de Información. o Grupo de trabajo de Prevención. o Grupo de trabajo de Seguridad en la extinción. o Grupo de trabajo de SMI y acreditación de la formación. o Grupo de trabajo de Criterios de despliegue de medios de extinción. o Nueva propuesta para la creación de grupo de trabajo de Interfaz Urbano Forestal. o Intervención de la Dirección General de Protección Civil y Emergencias (Ministerio del Interior). o Proyecto HERMES para el seguimiento de medios aéreos y codificación de los mismos. o Intervención del Servicio Prevención de Riesgos Laborales del MAPAMA para informar sobre la coordinación de actividades empresariales. o Recomendaciones sobre procedimientos operativos con aviones anfibios del MAPAMA, operados por el 43 Grupo de Fuerzas Aéreas. o Trabajos de las Brigadas Labores Preventivas, cofinanciados con el fondo europeo para el desarrollo rural FEADER. o Cursos de formación impartidos por el ADCIF: criterios de selección alumnos. El día 13 de diciembre de 2016 tuvo lugar en las instalaciones del CENCA, una jornada técnica de análisis de la lucha contra incendios en la campaña 2016 dirigida a administraciones públicas y expertos del sector. Los asuntos tratados fueron: o Análisis de la campaña realizada por diferentes comunidades autónomas, el MAPAMA, 43 Grupo y UME. o Situación actual de contrataciones de medios aéreos realizada por diferentes administraciones. o Pliegos de medios aéreos, análisis y propuestas de mejora. o Accidentes e incidentes de aviación civil en la lucha contra incendios forestales.
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016 AVANCE INFORMATIVO
5
- 1.3 Centro de Coordinación de la Información Nacional sobre
Incendios Forestales (CCINIF)
Las funciones desarrolladas por el CCINIF, encomendadas por el Real Decreto-Ley 11/2005, para facilitar la coordinación con el resto de administraciones públicas competentes, son las siguientes: Canalizar de forma centralizada y poner a disposición del conjunto de las Administraciones públicas competentes, en tiempo real, toda la información de que dispongan las distintas Administraciones públicas en relación con la evolución del riesgo de incendios forestales, los medios materiales, técnicos y personales disponibles en cada momento y los incendios forestales, una vez que se produzcan. La información de los siniestros que se producen y los medios estatales del MAPAMA que los atienden se actualiza tres veces al día en la página web del Ministerio. Diariamente se publican el mapa de riesgo diario y las intervenciones de los medios del Ministerio en los incendios forestales sucedidos el día anterior.
Ejemplo del mapa de riesgo publicado diariamente por el CCINIF Se puede consultar la información diaria relativa a actuaciones y riesgo de incendio en el siguiente enlace:
http://www.mapama.gob.es/es/desarrollo-rural/temas/politica-forestal/incendios- forestales/extincion/default.aspx
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016 AVANCE INFORMATIVO
6
- 2 Actuaciones de Prevención
- 2.1 Formación en defensa contra incendios forestales
Durante el año 2016 el MAPAMA realizó los siguientes cursos de formación destinados
a profesionales que trabajan en la defensa contra incendios forestales:
Curso de Implementación de EGIFWeb: nuevo formulario de parte de incendios con aplicación informática vía Web, celebrado en Pamplona (Navarra) el 31 de
mayo.
Curso sobre Fuego prescrito celebrado en sesión teórica y práctica, en Madrid
del 17 al 21 de octubre y en Orense del 14 al 18 de noviembre, respectivamente.
Curso de Sistema de Mando de Incidentes (Incident Command System) ICS 200-
300, celebrado en Madrid del 14 al 17 de noviembre.
Curso Superior de Seguridad e Investigación de Accidentes en Incendios
Forestales, celebrado en Madrid del 14 a 18 de noviembre.
2 cursos de Inteligencia emocional y gestión de estrés en las emergencias por incendios forestales, celebrado en Madrid del 12 al 14 y del 19 al 21 de diciembre.
- 2.2 Equipos de Prevención Integral (EPRIF)
En 2016 los EPRIF estuvieron operativos desde el 18 de enero hasta el 30 de mayo y retomaron los trabajos desde el 2 de noviembre hasta el 23 de diciembre, completando un máximo de 6 meses de trabajo al finalizar el año. Durante este periodo los EPRIF han trabajado mayormente en la realización de actividades formativas y reuniones con diversos colectivos, principalmente ganaderos, agricultores, cazadores, asociaciones de vecinos, representantes de ayuntamientos o profesores, con el objeto de conciliar intereses y concienciar en la prevención de incendios forestales. Entre las actuaciones realizadas durante el primer periodo de 2016 destaca el tratamiento de 1.065 hectáreas mediante la ejecución de 180 quemas controladas, todas ellas conducentes a reducir el riesgo de incendios forestales mediante la disminución del combustible forestal y la creación de discontinuidades en la vegetación, al tiempo que se alcanzan otros objetivos como la mejora de pastos, favorecer el hábitat de diversas especies o mejorar la accesibilidad en el monte, entre otros. Sin embargo se prepararon un total de 877 parcelas para la realización de quemas, aunque las condiciones meteorológicas no permitieron la ejecución de todas ellas. Para la ejecución de las quemas controladas los EPRIF situados en Huesca, Tabuyo (León), Cangas del Narcea (Asturias), Pola de Lena (Asturias) y Gredos (Ávila) recibieron ocasionalmente el apoyo de las Brigadas de Labores Preventivas del MAPAMA con bases próximas a la zona de actuación.
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016 AVANCE INFORMATIVO
7
- 2.3 Brigadas de Labores Preventivas (BLP)
Las Brigadas de Labores Preventivas del MAPAMA actuaron, en colaboración con las administraciones autonómicas, desde principios de año hasta el comienzo de la campaña de verano. Una vez terminada la campaña de verano se retomaron los trabajos de prevención, que finalizaron a mediados del mes de diciembre, ampliando así el periodo de trabajo a unos 11 meses. Durante estos dos periodos de trabajo realizaron trabajos de prevención de incendios en más de 1.577 hectáreas de terrenos forestales que incluyeron clareos, podas y desbroces fundamentalmente. En total más de 400 trabajadores distribuidos en las 10 Brigadas de Labores Preventivas ejecutaron trabajos de selvicultura preventiva en montes próximos al entorno de las bases BRIF donde desarrollan su trabajo en las campañas de extinción de incendios forestales. Como se ha señalado las BLP trabajan ocasionalmente en apoyo a los EPRIF en la ejecución de quemas prescritas.
- 3 Actuaciones de Extinción
- 3.1 Medios humanos: Brigadas de Refuerzo en Incendios Forestales
(BRIF)
El MAPAMA despliega cinco BRIF-i durante la campaña de invierno-primavera, en el norte y oeste de la Península, y diez BRIF durante la campaña de verano distribuidas por todo el territorio nacional, como se recoge en los mapas anexos. En la campaña de verano las BRIF se componen de tres turnos formados cada uno por 2 capataces y 14 especialistas, bajo el mando de 1 técnico; para el transporte y apoyo a la extinción cuentan con dos helicópteros de 1.200 litros de capacidad. En el Puerto del Pico (Ávila) se dispone de una brigada tipo BRIF-B, que es de menor tamaño y de composición igual a las brigadas de la campaña de invierno BRIF-i, consistente en turnos de 7 especialistas, 1 capataz y 1 técnico dotados de un sólo helicóptero de 1.200 litros para el transporte y apoyo a la extinción.
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016 AVANCE INFORMATIVO
8
Figura 1. BRIF de Puerto el Pico realizando ataque directo el 30 de junio de 2016 en el incendio de Navalosa (Ávila)
Estas unidades helitransportadas de personal altamente especializado en la extinción de incendios forestales, pueden actuar en cualquier punto del territorio nacional donde sean necesarios. El personal de las BRIF recibe una formación y entrenamiento continuados que les permiten actuar en situaciones de máxima exigencia, asumiendo, en la mayoría de las ocasiones, los sectores más complicados del incendio. El dominio de todas las técnicas de extinción, incluido el empleo del contrafuego, es imprescindible en su actuación. En la campaña de 2016 las BRIF trabajaron 1.877 horas en incendio en 293 intervenciones, realizando un total de 225.645 metros de longitud de línea combatida. Las BRIF con más actuaciones durante esta campaña ha sido la de Laza (Ourense) con 56 intervenciones sumando la campaña de verano e invierno
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016 AVANCE INFORMATIVO
9
- 3.2 Medios aéreos: aviones anfibios, helicópteros bombarderos,
helicópteros de transporte
El MAPAMA cuenta con un despliegue de medios aéreos gestionado desde el Área de Defensa contra Incendios Forestales, que cubre la superficie forestal nacional durante todo el año. Durante los dos periodos de mayor ocurrencia de incendios forestales, campañas de invierno y verano, se refuerza el número de medios disponibles.
Figura 2. Vista del incedio de Chella/Bolbaite (Valencia) desde el helicóptero de la BRIF de Prado de los Esquiladores el 16 de junio de 2016.
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016 AVANCE INFORMATIVO
10
Durante el año 2016, los medios aéreos del MAPAMA realizaron un total de 1.569 intervenciones en la extinción de incendios forestales, en apoyo a los dispositivos de las respectivas comunidades autónomas, con la distribución que se detalla en la siguiente tabla. En total volaron 4.642 horas en incendio, realizando 21.667 descargas sobre las llamas. En la tabla siguiente se detalla la distribución de actuaciones por comunidades autónomas y otros países:
Comunidad Autónoma Incendios Intervenciones Horas voladas en incendio Descargas Andalucía 49 85 0217:34 1.171 Aragón 28 67 0172:38 896 Asturias, Principado de 19 44 0135:08 784 Balears, Illes 18 25 0041:26 204 Canarias 5 41 0266:06 839 Cantabria 10 10 0023:02 121 Castilla León 100 254 0733:20 3.657 Castilla-La Mancha 31 79 0229:48 1.273 Cataluña 27 71 0147:35 363 Comunitat Valenciana 14 115 0577:56 2.268 Extremadura 45 169 0670:38 3.351 Galicia 143 533 1229:16 6.056 Madrid, Comunidad de Sin intervención Murcia, Región de 4 10 0036:02 138 Navarra, Comunidad Foral de 14 29 0060:34 144 País Vasco 2 3 0003:05 3 Rioja, La 7 8 0009:21 18 Ceuta 1 1 0000:55 3 Melilla Sin intervención Total Nacional 517 1.544 4554:24 21.289 Otros Países 7 25 0087:55 378
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016 AVANCE INFORMATIVO
11
Figura 3. Intervenciones de los medios del MAPAMA en siniestros de 2016.
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016 AVANCE INFORMATIVO
12
- 4. Cooperación Internacional
Durante el 2016 el MAPAMA participó en las siguientes reuniones internacionales:
6ª Reunión del Comité ejecutivo de Silva Mediterránea, celebrado en Roma el 8
de abril.
1er Curso de entrenamiento del proyecto BUFFER-IT para personal de operaciones en lucha contra incendios, celebrado en Lamezia Terme (Italia) del
16 al 23 de mayo.
Participación en el Taller internacional EU-China sobre Gestión de Incendios Forestales desarrollado en el marco del Disaster Risk Management Project,
celebrado en China del 16 al 23 de octubre.
35ª Reunión del Grupo de Expertos en Incendios Forestales de la Comisión Europea, celebrada en Bruselas (Bélgica) el 7 de noviembre de 2016.
- Daños producidos en 2016 por los incendios forestales
- 1 Número de incendios y superficies afectadas
La estadística provisional del periodo comprendido entre el 1 de enero y el 31 de diciembre del año 2016, adjunta como anexo a este informe, se elabora con la información que envían las comunidades autónomas con periodicidad semanal durante la campaña de verano, y mensual para el resto del año. El número total de siniestros ha descendido un 32% con respecto a la media del último decenio, con una reducción del 25% en el número de conatos (superficie ≤1 ha) y del 47% en el de incendios (superficie > 1ha) respectivamente. Ha sido el año con menor número de siniestros del último decenio. MEDIA DEL DECENIO 2006-2015 (01/01/-31/12) AÑO 2016 (01/01-31/12) Nº CONATOS ( ha) 8.662 6.479 Nº INCENDIOS (≥1 ha) 4.464 2.338 TOTAL SINIESTROS 13.126 8.817
Como puede apreciarse en el gráfico siguiente, el número de siniestros del año 2016 son similares a los correspondientes a los años 2014 y 2013, que se encuentran entre los de menor siniestralidad del decenio.
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016 AVANCE INFORMATIVO
13
Figura 4. Evolución del número de conatos e incendios durante el periodo 2006-2016. En cuanto a las superficies afectadas se produce un descenso con respecto a la media, siendo de un 37% en la superficie arbolada y de un 34% en superficie forestal. El año 2016 ocupa el quinto lugar del decenio en superficie afectada.
MEDIA DEL DECENIO 2006-2015 (01/01/-31/12) AÑO 2016 (01/01-31/12) S. ARBOLADA (ha) 32.102,06 23.173,92 S. FORESTAL (ha) 100.957,54 65.816,69
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016 AVANCE INFORMATIVO
14
Figura 5. Evolución de superficies forestales afectadas durante el periodo 2006-2016. Dada la heterogeneidad del territorio nacional en cuanto a meteorología, topografía, vegetación y factores socioeconómicos existentes, tradicionalmente se aborda el análisis de la siniestralidad de incendios forestales de forma regionalizada de acuerdo a cuatro zonas con homogéneas. Las zonas definidas son las siguientes: NOROESTE: Comprende las comunidades autónomas de Galicia, Asturias, Cantabria y País Vasco y las provincias de León y Zamora. MEDITERRÁNEO: Comprende las comunidades autónomas costeras con el mar Mediterráneo, incluyendo sus provincias interiores. CANARIAS: Incluye todo el archipiélago canario. COMUNIDADES INTERIORES: Comprende las provincias del resto de comunidades no costeras, excepto León y Zamora.
Teniendo en cuenta esta zonificación se aprecia que la región Noroeste es la que sufre un mayor número de siniestros, con un 44% del total anual. Le sigue la región de las Comunidades Interiores, con el 33,68 %, la zona del Mediterráneo y finalmente Canarias.
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016 AVANCE INFORMATIVO
15
Figura 6. Distribución del número de siniestros por ámbito territorial. Teniendo en cuenta la superficie forestal afectada la región Noroeste representa el 49,71% del total, seguida por la región de las Comunidades Interiores, la región del Mediterráneo y, con valores muy inferiores, Canarias.
Figura 7. Distribución de la superficie afectada por ámbito territorial.
- 2 Grandes Incendios Forestales (GIF)
Según la estadística provisional proporcionada por los servicios competentes de las administraciones autonómicas, durante 2016 tuvieron lugar 22 Grandes Incendios Forestales (GIF), categoría que incluye aquellos incendios que superan las 500 hectáreas forestales afectadas.
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016 AVANCE INFORMATIVO
16
Los GIF se repartieron durante la campaña de verano salvo uno que se produjo fuera de este periodo. En total los GIF registrados supusieron, según se recoge en la tabla adjunta, un 49,43% de la superficie total afectada y un 0,24% del total de siniestros ocurridos. Provincia Municipio Fecha (día/mes) Superficie Forestal (ha) Valencia Chella/Bolbaite 15-jun. 1.535,73 Valencia Carcaixent 16-jun. 2.210,67 Albacete Liétor 30-jun. 871,00 Cáceres Cáceres 23-jul. 1.394,46 Castellón Artana 25-jul. 1.534,50 S.C. Tenerife El Paso (La Palma) 3-ago. 4.793,63 A Coruña Santiago de Compostela 10-ago. 825,18 A Coruña Porto do Son (Caamaño) 10-ago. 730,00 A Coruña Porto do Son (Xuño) 10-ago. 870,00 Pontevedra Arbo 10-ago. 1.992,05 Cáceres Jerte 18-ago. 1.053,70 Navarra Tafalla/Pueyo 25-ago. 1.455,00 Sevilla Castillo de la Guardas 28-ago. 1.224,92 Alicante Poble Nou de Benitatxel 4-sep. 689,30 Ourense Muiños 5-sep. 747,00 Ourense Oímbra 6-sep. 1.363,25 Ourense Entrimo 6-sep. 2.999,50 Ourense Cualedro 12-sep. 1.588,44 León Fabero 12-sep. 2.620,88 León Encinedo 12-sep. 810,61 Salamanca Olmedo de Camaces 24-sep. 656,43 Lleida La Guingueta d'Aneu 3-nov. 567,74 SUPERFICIE FORESTAL AFECTADA 32.533,99
La región geográfica Comunidades Interiores fue la más castigada por los GIF, al ser el escenario del 45 % de ellos y del 44% de la superficie incendiada por los mismos. .
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016 AVANCE INFORMATIVO
17
- Anexos
- 1 Avance estadístico Incendios Forestales (1 enero al 31 de diciembre)
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016 AVANCE INFORMATIVO
18
Datos por comunidades autónomas. Año 2016
Conatos Incendios Forestal < 1 ha
=1 ha
Arbolada Matorral y M.Bajo Total Herbácea Alava 15 8 8,80 27,16 35,96 12,41 Guipúzcoa 10 1 3,70 1,90 5,60 4,57 Vizcaya 29 12 6,70 71,91 78,61 6,52 PAIS VASCO 54 21 19,20 100,97 120,17 23,50 Barcelona 243 15 82,70 52,94 135,64 7,26 Girona 85 16 109,60 26,82 136,42 2,55 Lleida 50 18 345,13 627,85 972,98 100,62 Tarragona 115 15 403,92 117,94 521,86 6,39 CATALUÑA 493 64 941,35 825,55 1.766,90 116,81 A Coruña 475 122 2.322,43 1.578,44 3.900,87 0,00 Lugo 285 76 332,80 561,68 894,48 0,00 Ourense 577 228 3.204,24 8.151,00 11.355,24 0,00 Pontevedra 535 102 2.986,38 1.975,22 4.961,60 0,00 GALICIA (*) 1.872 528 8.845,85 12.266,34 21.112,19 0,00 Almería 52 10 0,12 73,69 73,81 0,00 Cadiz 70 11 28,92 453,73 482,65 0,00 Córdoba 49 17 15,35 127,18 142,53 0,00 Granada 97 24 37,71 170,10 207,81 0,00 Huelva 81 19 286,52 264,61 551,13 0,00 Jaén 105 17 49,08 168,62 217,70 0,00 Málaga 72 17 89,59 187,09 276,68 0,00 Sevilla 85 31 558,88 849,96 1.408,84 0,00 ANDALUCIA () 611 146 1.066,17 2.294,98 3.361,15 0,00 ASTURIAS 466 164 231,17 1.306,52 1.537,69 6,80 CANTABRIA 59 145 256,63 1.008,96 1.265,59 19,90 LA RIOJA () 35 12 54,00 39,07 93,08 0,00 MURCIA 99 14 290,17 143,21 433,38 5,32 Alicante 78 17 530,21 738,44 1.268,65 0,00 Castellón 59 10 1.450,11 133,29 1.583,40 0,00 Valencia 143 33 441,52 3.619,88 4.061,40 0,00 COM. VALENCIANA 280 60 2.421,84 4.491,61 6.913,45 0,00 Huesca 68 17 92,10 304,03 396,13 0,00 Teruel 72 22 129,78 84,41 214,19 0,00 Zaragoza 80 36 88,02 216,88 304,90 0,00 ARAGÓN () 220 75 309,90 605,32 915,22 0,00 Albacete 63 15 900,09 42,36 942,45 11,31 Ciudad Real 59 35 10,50 164,97 175,47 133,24 Cuenca 76 35 872,21 98,38 970,59 105,07 Guadalajara 89 26 230,41 71,96 302,37 51,49 Toledo 158 100 104,24 231,68 335,92 383,29 CASTILLA LA MANCHA 445 211 2.117,46 609,35 2.726,80 684,40 Las Palmas de Gran Canaria 49 5 0,01 2,05 2,06 17,14 S.C. de Tenerife 28 6 3.481,85 1.323,06 4.804,91 0,00 CANARIAS 77 11 3.481,86 1.325,11 4.806,97 17,14 NAVARRA 143 80 563,43 970,61 1.534,04 196,73 Badajoz 172 183 486,90 451,64 938,54 927,65 Cáceres 216 132 222,10 2.375,22 2.597,32 1.901,01 EXTREMADURA 388 315 709,00 2.826,86 3.535,86 2.828,66 ILLES BALEARS 95 18 86,12 76,20 162,32 67,30 MADRID 224 47 8,98 19,62 28,60 380,08 Avila 112 29 74,74 212,82 287,56 39,86 Burgos 93 32 56,42 42,10 98,52 57,36 León 224 184 1.127,10 5.029,91 6.157,01 490,30 Palencia 59 34 72,99 59,76 132,75 80,83 Salamanca 144 50 104,41 355,12 459,53 1.166,62 Segovia 52 12 3,53 1,99 5,52 43,11 Soria 66 8 10,40 8,28 18,68 24,77 Valladolid 59 24 18,64 15,48 34,12 74,14 Zamora 109 53 302,56 1.565,95 1.868,51 114,44 CASTILLA Y LEÓN 918 426 1.770,79 7.291,41 9.062,20 2.091,43 CEUTA 0 1 0,00 3,00 3,00 0,00 MELILLA 0 0 0,00 0,00 0,00 0,00 TOTAL 6.479 2.338 23.173,92 36.204,69 59.378,61 6.438,08 (*) Sin diferenciación entre superficie desarbolada herbácea y leñosa () Sin datos de superficie herbácea Forestal Leñosa Num. Siniestros SUPERFICIES PROVINCIA / COM. AUTONOMA
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016 AVANCE INFORMATIVO
19
- 2. Distribución de los medios del MAPAMA 2016
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016 AVANCE INFORMATIVO
20
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016 AVANCE INFORMATIVO
21
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016 AVANCE INFORMATIVO
22
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016 AVANCE INFORMATIVO
23
- 3. Actividad de los medios del MAPAMA 2016
Resumen de Actividad de Equipos de Prevención Integral en incendios forestales (EPRIF). Año 2016
Núm. Tiempo Sup. Núm. Tiempo tratamientos preventivos Núm. Tiempo Sup. Forestal Núm. Tiempo mantenimiento, herramientas y adecuación de base Sup. Forestal Asturias Centro 0 0:00 0,00 46 141:45 15 125:00 54,86 0 0:00 0,00 Asturias Este 0 0:00 0,00 68 106:00 21 146:25 50,10 0 0:00 0,00 Asturias Oeste 0 0:00 0,00 12 63:00 10 65:45 47,22 0 0:00 0,00 Ávila 1 0:14 0,01 51 255:00 3 28:15 25,50 0 0:00 0,00 Cáceres 0 0:00 0,00 23 97:45 6 62:10 68,59 0 0:00 0,00 Cantabria 1 1:02 0,18 70 166:30 25 45:55 318,29 0 0:00 0,00 Huesca 0 0:00 0,00 19 105:00 4 32:30 29,90 0 0:00 0,00 La Coruña 0 0:00 0,00 86 138:25 14 58:20 95,04 0 0:00 0,00 La Palma 0 0:00 0,00 35 129:20 5 50:25 3,69 0 0:00 0,00 La Rioja 0 0:00 0,00 23 97:00 1 7:00 1,60 0 0:00 0,00 León 0 0:00 0,00 28 121:30 8 65:30 44,03 0 0:00 0,00 Lugo 0 0:00 0,00 95 96:30 5 16:35 25,59 0 0:00 0,00 Navarra Este 1 2:55 23,00 54 179:05 10 76:12 122,10 0 0:00 0,00 Navarra Oeste 0 0:00 0,00 56 154:30 8 51:13 47,50 0 0:00 0,00 Orense 0 0:00 0,00 45 116:50 13 43:41 24,46 1 6:30 2,00 Pontevedra 0 0:00 0,00 105 135:04 21 64:58 65,69 0 0:00 0,00 Valencia 0 0:00 0,00 21 96:00 4 26:30 4,40 0 0:00 0,00 Zamora 2 5:20 12,00 40 67:02 7 33:45 37,03 3 20:00 3,26 Total 5 9:31 35,19 877 2266:16 180 1000:09 1.065,59 4 26:30 5,26 Núm. Tiempo Núm. Tiempo Núm. Tiempo Núm. Tiempo Asturias Centro 0 0:00 11 32:00 43 110:30 0 0 570:00 Asturias Este 0 0:00 64 65:40 31 85:55 0 0:00 508:50 Asturias Oeste 0 0:00 12 39:30 27 117:30 7 35:00 640:00 Ávila 0 0:00 4 14:30 31 142:30 0 0:00 756:00 Cáceres 0 0:00 8 33:30 13 55:15 1 1:00 643:15 Cantabria 0 0:00 12 27:00 69 108:15 16 78:30 674:00 Huesca 0 0:00 4 15:00 26 97:00 3 14:00 592:30 La Coruña 0 0:00 59 40:15 103 88:20 1 3:00 706:55 La Palma 0 0:00 7 19:30 31 88:20 6 45:00 754:40 La Rioja 0 0:00 1 5:00 30 85:30 8 39:00 771:00 León 0 0:00 0 0:00 11 39:00 8 60:00 645:30 Lugo 0 0:00 7 5:35 105 111:50 1 5:25 422:00 Navarra Este 0 0:00 17 42:13 16 55:47 0 0:00 625:32 Navarra Oeste 0 0:00 17 33:00 58 95:00 1 7:30 714:00 Orense 0 0:00 4 3:35 63 77:07 18 32:05 454:52 Pontevedra 0 0:00 48 34:51 87 72:28 6 18:24 375:57 Valencia 0 0:00 4 10:30 38 104:00 1 11:00 696:00 Zamora 0 0:00 7 12:55 126 177:45 0 0:00 407:59 Total 0 0:00 286 434:34 908 1712:02 77 349:54 10959:00
- Otras actividades corresponden a trabajos de gabinete, rutas de vigilancia, asistencia a mercados de ganado, etc
EPRIF Formación/Concienciación EPRIF Otras activivades Asistencia a incendio Preparación parcelas Quema controlada Desbroce mecánico Investigación de Causas Ev. Labores anteriores Reuniones
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016
AVANCE INFORMATIVO 24
Resumen de Actividad de las Brigadas de Refuerzo contra Incendios Forestales (BRIF). Año 2016
Ataque Directo y A. Indirecto Remate y otros Laza 01-mar 29-abr 1 1 1:08 0:35 1 1 150 0 Pinofranqueado 15-feb 14-abr 1 1 3:22 1:55 1 1 270 500 Ruente 22-feb 21-abr 8 8 21:03 8:28 1 1 4.044 25 Tabuyo del Monte 15-feb 14-abr 0 0 0:00 0:00 0 0 0 0 Tineo 01-mar 29-abr. 5 5 12:23 6:25 1 1 2.000 0 Total BRIF-i 15 XXX* 37:56 17:23 XXX* XXX* 6.464 525 Puerto el Pico 15-jun 14-oct 26 21 91:50 63:03 3 3 9.829 4.258 Total BRIF-B 26 XXX* 91:50 63:03 XXX* XXX* 9.829 4.258 Cuenca 15-jun 14-oct 22 18 193:23 77:24 5 2 14.883 9.277 Daroca 15-jun. 14-oct. 26 20 188:36 71:11 6 2 12.128 5.470 La Iglesuela 15-jun. 14-oct. 25 18 173:20 77:19 4 4 11.267 8.671 Laza 15-jun. 14-oct. 57 51 288:50 155:09 6 2 25.238 12.573 Lubia 1-jul. 30-oct. 13 13 148:59 39:27 7 6 4.788 4.898 Pinofranqueado 15-jun. 14-oct. 36 25 153:45 79:54 5 3 18.463 7.077 Puntagorda 15-jun. 14-oct. 15 2 165:21 78:36 1 1 13.812 4.400 Tabuyo del Monte 15-jun. 14-oct. 33 26 232:16 99:26 4 2 28.810 7.819 Tineo 1-jul. 30-oct. 25 22 203:34 81:44 5 3 11.295 3.700 Total BRIF-A 252 XXX* 1748:04 760:10 XXX* XXX* 140.684 63.885 293 XXX* 1877:50:00 840:36:00 XXX* XXX* 156.977 68.668
- XXX No se puede totalizar el número de incendios atendidos ya que en un mismo incendio pueden haber intervenido medios de distintas bases
Tiempo real extinción Nº Prov. Nº CCAA Total BRIF Long. Línea (m.) BRIF El nº de salidas contabiliza las salidas totales de la base en extinción de incendios. Hay más de una salida a un mismo incendio cuando en este trabajan varios turnos de brigadas Fecha inicio activ. BRIF * Fecha fin de actividad BRIF Nº salidas Nº incendio s Tiempo total incendio *Periodo de formación: todas las brigadas reciben formación en la quincena anterior a la fecha de inicio de actividad. El nº de incendios contabiliza los incendios en los que ha intervenido la BRIF de la base El tiempo total en incendio computa desde la salida a regreso a base de la Brigada El tiempo real en extinción computa el tiempo dedicado al combate del fuego sin incluir tiempos de transporte, esperas, descansos, etc El Núm. Prov.y el Núm. CCAA indica el número de provincias y CCAA en las que ha intervenido en extinción cada base BRIF Long. Linea incluye longitud de frente combatido en metros, diferenciando dos grupos: 1.-trabajos de ataque directo e indirecto y 2.-labores de remate, liquidación u otros tipos de actuación
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016
AVANCE INFORMATIVO 25
Resumen de actuación de las Brigadas de Refuerzo contra incendios Forestales (BRIF) por comunidad autónoma. Año 2016
Núm. Int Núm. Inc. T. Total T. Línea Núm. Int Núm. Inc. T. Total T. Línea Núm. Int Núm. Inc. T. Total T. Línea Núm. Int Núm. Inc. T. Total T. Línea Núm. Int Núm. Inc. T. Total T. Línea Núm. Int Núm. Inc. T. Total T. Línea Laza 0 0 0:00 0 0 0 0:00 0 1 1 0:35 150 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Pinofranqueado 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Ruente 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 8 8 8:28 4.069 Tabuyo del Monte 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Tineo 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 5 5 6:25 2.000 0 0 0:00 0 Total BRIF-i 0 XXX* 0:00 0 0 XXX* 0:00 0 1 XXX* 0:35 150 0 XXX* 0:00 0 5 XXX* 6:25 2.000 8 XXX* 8:28 4.069 Puerto el Pico 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Total BRIF-B 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 Cuenca 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Daroca 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 La Iglesuela 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Laza 0 0 0:00 0 0 0 0:00 0 54 48 144:44 36.258 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Lubia 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 4:45 700 1 1 4:00 1.100 Pinofranqueado 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Puntagorda 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Tabuyo del Monte 0 0 0:00 0 0 0 0:00 0 3 3 14:09 4.775 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Tineo 0 0 0:00 0 0 0 0:00 0 4 4 16:09 3.090 0 0 0:00 0 17 14 55:34 9.345 0 0 0:00 0 Total BRIF-A 0 XXX* 0:00 0 0 XXX* 0:00 0 61 XXX* 175:02 44.123 0 XXX* 0:00 0 18 XXX* 60:19 10.045 1 XXX* 4:00 1.100 TOTAL BRIF 0 XXX* 0:00 0 0 XXX* 0:00 0 62 XXX* 175:37 44.273 0 XXX* 0:00 0 23 XXX* 66:44 12.045 9 XXX* 12:28 5.169 º Núm. Int Núm. Inc. T. Total T. Línea Núm. Int Núm. Inc. T. Total T. Línea Núm. Int Núm. Inc. T. Total T. Línea Núm. Int Núm. Inc. T. Total T. Línea Núm. Int Núm. Inc. T. Total T. Línea Núm. Int Núm. Inc. T. Total T. Línea Laza 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Pinofranqueado 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Ruente 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Tabuyo del Monte 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Tineo 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Total BRIF-i 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 Puerto el Pico 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 1:53 920 0 0 0:00 0 Total BRIF-B 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 1 XXX* 1:53 920 0 XXX* 0:00 0 Cuenca 0 0 0:00 0 0 0 0:00 0 7 5 33:52 6.979 0 0 0:00 0 15 13 43:32 17.181 0 0 0:00 0 Daroca 0 0 0:00 0 0 0 0:00 0 9 5 38:03 6.560 17 15 264912:00 11.038 0 0 0:00 0 0 0 0:00 0 La Iglesuela 0 0 0:00 0 0 0 0:00 0 1 1 9:28 2.506 0 0 0:00 0 8 8 16:40 7.018 0 0 0:00 0 Laza 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Lubia 0 0 0:00 0 0 0 0:00 0 1 1 10:45 3.400 0 0 0:00 0 1 1 0:45 0 0 0 0:00 0 Pinofranqueado 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Puntagorda 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 15 2 78:36 18.212 Tabuyo del Monte 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Tineo 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Total BRIF-A 0 XXX* 0:00 0 0 XXX* 0:00 0 18 XXX* 92:08 19.445 17 XXX* 264912:00 11.038 24 XXX* 60:57 24.199 15 XXX* 78:36 18.212 TOTAL BRIF 0 XXX* 0:00 0 0 XXX* 0:00 0 18 XXX* 92:08 19.445 17 XXX* 264912:00 11.038 25 XXX* 62:50 25.119 15 XXX* 78:36 18.212 Núm. Int Núm. Inc. T. Total T. Línea Núm. Int Núm. Inc. T. Total T. Línea Núm. Int Núm. Inc. T. Total T. Línea Núm. Int Núm. Inc. T. Total T. Línea Núm. Int Núm. Inc. T. Total T. Línea Núm. Int Núm. Inc. T. Total T. Línea Laza 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Pinofranqueado 0 0 0:00 0 1 1 1:55 770 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Ruente 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Tabuyo del Monte 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Tineo 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Total BRIF-i 0 XXX* 0:00 0 1 XXX* 1:55 770 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 Puerto el Pico 0 0 0:00 0 3 2 13:55 870 0 0 0:00 0 0 0 0:00 0 22 18 47:15 12.297 0 0 0:00 0 Total BRIF-B 0 XXX* 0:00 0 3 XXX* 13:55 870 0 XXX* 0:00 0 0 XXX* 0:00 0 22 XXX* 47:15 12.297 0 XXX* 0:00 0 Cuenca 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Daroca 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 La Iglesuela 0 0 0:00 0 7 2 32:09 5.947 0 0 0:00 0 0 0 0:00 0 9 7 19:02 4.467 0 0 0:00 0 Laza 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 3 3 10:25 1.553 0 0 0:00 0 Lubia 0 0 0:00 0 1 1 8:20 800 0 0 0:00 0 0 0 0:00 0 8 8 10:52 3.686 0 0 0:00 0 Pinofranqueado 0 0 0:00 0 27 16 63:59 18.870 0 0 0:00 0 0 0 0:00 0 6 6 13:45 5.650 3 3 2:10 1.020 Puntagorda 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Tabuyo del Monte 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 30 23 85:17 31.854 0 0 0:00 0 Tineo 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 4 4 10:01 2.560 0 0 0:00 0 Total BRIF-A 0 XXX* 0:00 0 35 XXX* 104:28 25.617 0 XXX* 0:00 0 0 XXX* 0:00 0 60 XXX* 149:22 49.770 3 XXX* 2:10 1.020 TOTAL BRIF 0 XXX* 0:00 0 39 XXX* 120:18 27.257 0 XXX* 0:00 0 0 XXX* 0:00 0 82 XXX* 196:37 62.067 3 XXX* 2:10 1.020 CASTILLA-LA MANCHA CANARIAS Localización BRIF PAÍS VASCO CATALUÑA GALICIA ANDALUCÍA ASTURIAS CANTABRIA Localización BRIF LA RIOJA MURCIA C. VALENCIANA ARAGÓN T. total Tiempo total empleado en el incendio (se incluyen transportes, extinción, esperas, descansos y alojamientos si llega el caso) T. Lineal Longitud total de línea trabajada (se incluyen tanto la línea en ataque directo e indirecto como la de remate, liquidación u otros) Localización BRIF NAVARRA EXTREMADURA ISLAS BALEARES MADRID CASTILLA Y LEÓN PORTUGAL
- XXX No se puede totalizar el número de incendios atendidos ya que en un mismo incendio pueden haber intervenido medios de distintas bases
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016
AVANCE INFORMATIVO 26
Resumen de Actuación de los medios del MAPAMA. Aviones y Helicópteros de Extinción. Año 2016
F. alarma Inc. Contr. TORREJON (precampaña) CL-215T / CL-415 01/01 a 15/06 2-3 23 11 7 29:55 0:00 0:00 17:05 47:00 5 54 59 TORREJON (campaña) CL-215T / CL-415 16/06 a 30/09 3 - 4 75 54 28 277:40 0:00 1:45 49:35 329:00 20 698 718 TORREJON (postcampaña) CL-215T / CL-415 01/10 a 31/12 2- 4 10 5 3 21:25 0:00 0:00 10:10 31:35 0 34 34 LABACOLLA CL-215T / CL-415 01/07 a 30/09 2 - 3 178 172 90 413:45 0:00 3:40 0:00 417:25 0 1.911 1.911 ZARAGOZA CL-215T / CL-415 16/06 a 30/09 1 - 2 45 44 22 167:45 0:00 0:30 0:00 168:15 6 481 487 POLLENSA CL-215T / CL-415 01/06 a 30/09 1 9 9 8 36:05 0:00 0:00 0:00 36:05 0 218 218 MALAGA CL-215T / CL-415 16/06 a 30/09 1 - 2 14 22 11 114:05 0:00 1:30 5:55 121:30 35 357 392 LOS LLANOS CL-215T / CL-415 16/06 a 15/08 1 16 13 8 62:12 0:00 0:00 1:24 63:36 0 225 225 MATACAN CL-215T / CL-415 16/06 a 15/10 1 107 84 50 333:37 0:00 11:25 3:24 348:26 2 1.237 1.239 TALAVERA CL-215T / CL-415 01/07 a 30/09 1 40 38 29 135:53 0:00 0:10 1:45 137:48 0 602 602 TOTAL CL-215T/CL-415 2-3 517 452 XXX * 1592:22 0:00 19:00 89:18 1700:40 68 5.817 5.885 MATACÁN ACO 16/07 a15/10 1 64 59 51 148:06 0:00 0:00 4:47 152:53 XXX ** XXX ** XXX ** MUCHAMIEL ACO 16/07 a 15/10 1 21 12 7 57:21 0:00 1:42 4:23 63:26 XXX ** XXX ** XXX ** TOTAL ACOs 2 85 71 XXX * 205:27 0:00 1:42 9:10 216:19 XXX ** XXX ** XXX ** XINZO DE LIMIA Airtractor 802 21/07 a 15/10 2 161 119 59 159:03 0:00 2:18 81:27 242:48 165 291 456 NOAIN Airtractor 802 21/07 a 15/10 1 50 18 15 28:30 0:00 1:06 42:45 72:21 0 70 70 SON BONET Airtractor 802 21/07 a 15/10 1 54 17 17 20:42 0:00 5:09 42:00 67:51 3 39 42 NIEBLA Airtractor 802 20/07 a 15/10 1 45 21 20 32:38 0:00 0:14 38:30 71:22 62 13 75 AMPURIABRAVA Airtractor 802 20/07 a 15/10 2 80 26 13 38:41 0:00 4:49 68:47 112:17 38 61 99 REUS (Aa) Airtractor 802 FB 01/07 a 30/09 2 65 37 17 91:13 0:00 5:59 18:55 116:07 0 255 255 MANISES (Aa) Airtractor 802 FB 01/07 a 30/09 2 44 24 9 88:53 0:00 3:08 21:30 113:31 0 335 335 ROSINOS (Aa) Airtractor 802 FB 01/07 a 15/10 1 - 2 115 76 43 184:19 0:00 1:12 37:38 223:09 0 491 491 LA GOMERA Airtractor 802 21/07 a 15/10 1 31 6 1 31:20 0:00 0:00 39:20 70:40 0 51 51 AGONCILLO Airtractor 802 21/07 a 15/10 2 89 26 14 39:15 0:00 3:57 86:18 129:30 2 76 78 TOTAL Airtractor 16 734 370 XXX * 714:34 0:00 27:52 477:10 1219:36 270 1.682 1.952 MUCHAMIEL Kamov K-32A 11BC 16/02 a 14/06 1-2 24 6 5 12:26 0:00 9:46 0:00 22:12 0 68 68 PALMA DEL RIO Kamov K-32A 11BC 01/03 a 14/06 1-2 14 1 1 6:00 0:00 0:00 6:35 12:35 0 51 51 TABUYO DEL MONTE Kamov K-32A 11BC 15/02 a 14/04 1 11 1 1 2:29 0:00 0:00 12:48 15:17 0 10 10 IBIAS Kamov K-32A 11BC 01/03 a 29/04 1 6 1 1 1:43 0:00 0:00 13:33 15:16 0 10 10 LAZA Kamov K-32A 11BC 01/03 a 29/04 1 10 1 1 1:18 0:00 0:00 14:44 16:02 0 7 7 TOTAL KAMOV invierno 2-5 65 10 XXX * 23:56 0:00 9:46 47:40 81:22 0 146 146 LA ALMORAIMA Kamov K-32A 11BC 16/06 a 15/10 1 27 16 16 33:42 0:00 0:19 8:40 42:41 22 268 290 VILLARES JADRAQUE Kamov K-32A 11BC 16/06 a 15/10 1 34 15 13 40:01 0:00 2:27 11:24 53:52 0 208 208 LOS RODEOS Kamov K-32A 11BC 01/07 a 30/10 1 26 8 3 38:00 0:00 0:00 38:39 76:39 0 204 204 PLASENCIA DE CÁCERES Kamov K-32A 11BC 16/06 a 15/10 1 65 50 40 133:22 0:00 3:26 12:08 148:56 228 897 1.125 HUELMA Kamov K-32A 11BC 16/06 a 15/10 1 31 16 12 43:37 0:00 0:00 11:22 54:59 94 249 343 IBIAS Kamov K-32A 11BC 01/07 a 30/10 1 64 40 34 130:46 0:00 4:25 18:33 153:44 0 809 809 CARAVACA Kamov K-32A 11BC 18/06 a 17/10 1 26 15 10 71:34 0:00 1:08 9:38 82:20 115 271 386 PLASENCIA DEL MONTE Kamov K-32A 11BC 01/07 a 30/10 1 29 17 14 44:27 0:00 0:16 12:05 56:48 0 295 295 TOTAL KAMOV verano 8 302 177 XXX * 535:29 0:00 12:01 122:29 669:59 459 3.201 3.660 TOTAL GENERAL 4-8 1703 1.080 XXX * 3071:48 0:00 70:21 745:47 3887:56 797 10.846 11.643 XXX * No se puede totalizar el número de incendios atendidos ya que en un mismo incendio pueden haber intervenido medios de distintas bases XXX ** Los aviones de ACO no realizan descargas Con Retardante Número DESCARGAS en incendio Sin Retardante Total NÚM. INCENDIOS ATENDIDOS HORAS DE VUELO (hh:mm) Incendio Reconoc. Otras Total NÚM. MISIONES INCENDIO BASE TIPO Periodo operativo Núm. AERONAVES NÚM. MISIONES
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016
AVANCE INFORMATIVO 27
Resumen de Actuación de los medios del MAPAMA. Helicópteros de Transporte. Año 2016
NÚM. NÚM. NÚM. NÚM. MISIONES INCENDIOS Falsa Alarma BRIGADAS PERSONAS Con Sin INCENDIO ATENDIDOS Inc. Controlado TRANSPOR. TRANSPOR. Espuma Espuma PINOFRANQUEADO Sokol PZL / Bell 412 15/02 a 14/04 1 14 1 1 2:51 0:00 0:00 18:05 20:56 1 9 0 13 13 TABUYO DEL MONTE Sokol PZL / Bell 412 15/02 a 14/04 1 12 0 0 0:00 0:00 0:00 15:59 15:59 0 0 0 0 0 TINEO Sokol PZL / Bell 412 01/03 a 29/04 1 12 5 5 9:41 0:00 0:00 13:48 23:29 5 41 0 23 23 LAZA Sokol PZL / Bell 412 01/03 a 29/04 1 11 1 1 1:15 0:00 0:00 10:15 11:30 1 9 0 5 5 RUENTE Sokol PZL / Bell 412 22/02 a 21/04 1 16 6 6 10:30 0:00 0:00 11:58 22:28 5 45 0 67 67 TOTAL BRIF-i 5 65 13 XXX * 24:17 0:00 0:00 70:05 94:22 12 104 0 108 108 DAROCA Sokol PZL / Bell 412 15/06 a 14/10 2 90 50 20 151:50 0:00 3:34 25:42 181:06 52 451 13 711 724 CUENCA Sokol PZL / Bell 412 15/06 a 14/10 2 74 39 17 159:40 0:00 0:42 29:10 189:32 43 382 0 842 842 LA IGLESUELA Sokol PZL / Bell 412 15/06 a 14/10 2 118 47 18 175:01 0:00 6:30 31:18 212:49 49 416 0 1.047 1.047 PINOFRANQUEADO Sokol PZL / Bell 412 15/06 a 14/10 2 99 56 23 185:13 0:00 11:21 27:24 223:58 66 568 708 800 1.508 LAZA Sokol PZL / Bell 412 15/06 a 14/10 2 149 105 54 281:05 0:00 4:51 33:39 319:35 112 933 0 2.508 2.508 PUERTO EL PICO Sokol PZL / Bell 412 15/06 a 14/10 1 56 24 22 69:32 0:00 6:58 8:37 85:07 25 225 0 468 468 TINEO Sokol PZL / Bell 412 01/07 a 30/10 2 82 46 22 138:07 0:00 3:29 39:31 181:07 46 374 0 797 797 LUBIA Sokol PZL / Bell 412 01/07 a 30/10 2 94 32 13 110:14 0:00 8:33 35:14 154:01 34 291 0 527 527 TABUYO DEL MONTE Sokol PZL / Bell 412 15/06 a 14/10 2 118 62 27 205:11 0:00 8:12 45:44 259:07 71 594 0 1.125 1.125 PUNTAGORDA Sokol PZL / Bell 412 15/06 a 14/10 2 52 15 2 70:21 0:00 0:48 46:39 117:48 2 17 0 370 370 TOTAL BRIF-A y B 19 932 476 XXX * 1546:14 0:00 54:58 322:58 1924:10 500 4.251 721 9.195 9.916 TOTAL GENERAL 5 997 489 XXX * 1570:31 0:00 54:58 393:03 2018:32 512 4.355 721 9.303 10.024 XXX * No se puede totalizar el número de incendios atendidos ya que en un mismo incendio pueden haber intervenido medios de distintas bases BASE TIPO Periodo operativo Num. AERONAVES NUM. MISIONES DESCARGAS Incendio Reconoc. Otras Total Total HORAS DE VUELO (hh:mm)
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016
AVANCE INFORMATIVO 28
Resumen de Actuación de los medios del MAPAMA por comunidad autónoma I. Aviones y Helicópteros de extinción. Año 2016
Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas TORREJON (precampaña) 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 7 4 17:20 34 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 2 2 8:15 20 0 0 0:00 0 0 0 0:00 0 TORREJON (campaña) 0 0 0:00 0 0 0 0:00 0 10 10 29:40 101 3 2 9:00 65 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 5:20 22 11 5 55:40 122 0 0 0:00 0 TORREJON (postcampaña) 0 0 0:00 0 2 1 12:15 11 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 LABACOLLA 0 0 0:00 0 0 0 0:00 0 168 86 399:45 1.862 0 0 0:00 0 1 1 3:10 7 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 ZARAGOZA 1 1 1:45 1 8 3 26:50 62 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 12 6 59:10 176 17 9 56:45 194 POLLENSA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 3 3 20:25 76 0 0 0:00 0 MALAGA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 16 8 55:25 268 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 2 2 14:15 43 0 0 0:00 0 LOS LLANOS 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 2 2 6:42 26 6 2 33:15 85 0 0 0:00 0 MATACAN 0 0 0:00 0 0 0 0:00 0 40 29 129:29 491 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 TALAVERA 0 0 0:00 0 0 0 0:00 0 2 2 7:02 22 9 7 26:20 169 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 TOTAL CL-215T/CL-415 1 XXX * 1:45 1 10 XXX * 39:05 73 220 XXX * 565:56 2.476 35 XXX * 108:05 536 1 XXX * 3:10 7 0 XXX * 0:00 0 0 XXX * 0:00 0 5 XXX * 20:17 68 34 XXX * 182:45 502 17 XXX * 56:45 194 MATACÁN 0 0 0:00 0 0 0 0:00 0 39 36 79:46 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 MUCHAMIEL 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 2 2 13:28 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 7 3 34:29 0 0 0 0:00 0 TOTAL ACOs 0 XXX * 0:00 0 0 XXX * 0:00 0 39 XXX * 79:46 0 2 XXX * 13:28 0 0 XXX * 0:00 0 0 XXX * 0:00 0 0 XXX * 0:00 0 0 XXX * 0:00 0 7 XXX * 34:29 0 0 XXX * 0:00 0 XINZO DE LIMIA 0 0 0:00 0 0 0 0:00 0 117 58 156:07 450 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 NOAIN 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 2:00 2 SON BONET 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 NIEBLA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 21 20 32:38 75 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 AMPURIABRAVA 0 0 0:00 0 26 13 38:41 99 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 REUS (Aa) 0 0 0:00 0 31 16 61:51 179 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 6 1 29:22 76 0 0 0:00 0 MANISES (Aa) 0 0 0:00 0 4 1 7:58 12 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 18 7 75:51 303 0 0 0:00 0 ROSINOS (Aa) 0 0 0:00 0 0 0 0:00 0 17 10 41:29 95 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 LA GOMERA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 AGONCILLO 2 1 1:20 2 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 8 6 9:21 18 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 TOTAL Airtractor 2 XXX * 1:20 2 61 XXX * 108:30 290 134 XXX * 197:36 545 21 XXX * 32:38 75 0 XXX * 0:00 0 0 XXX * 0:00 0 8 XXX * 9:21 18 0 XXX * 0:00 0 24 XXX * 105:13 379 1 XXX * 2:00 2 MUCHAMIEL 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 2 1 4:19 21 2 2 3:53 36 0 0 0:00 0 PALMA DEL RIO 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 6:00 51 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 TABUYO DEL MONTE 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 IBIAS 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 1:43 10 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 LAZA 0 0 0:00 0 0 0 0:00 0 1 1 1:18 7 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 TOTAL KAMOV invierno 0 XXX * 0:00 0 0 XXX * 0:00 0 1 XXX * 1:18 7 1 XXX * 6:00 51 1 XXX * 1:43 10 0 XXX * 0:00 0 0 XXX * 0:00 0 2 XXX * 4:19 21 2 XXX * 3:53 36 0 XXX * 0:00 0 LA ALMORAIMA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 15 15 32:47 287 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 VILLARES JADRAQUE 0 0 0:00 0 0 0 0:00 0 7 7 22:15 123 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 LOS RODEOS 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 PLASENCIA DE CÁCERES 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 4:00 8 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 HUELMA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 11 10 24:36 222 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 3 1 13:56 87 0 0 0:00 0 IBIAS 0 0 0:00 0 0 0 0:00 0 12 11 33:05 180 0 0 0:00 0 8 6 28:46 230 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 CARAVACA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 3 3 11:26 49 5 3 32:37 177 0 0 0:00 0 PLASENCIA DEL MONTE 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 17 14 44:27 295 TOTAL KAMOV verano 0 XXX * 0:00 0 0 XXX * 0:00 0 19 XXX * 55:20 303 26 XXX * 57:23 509 9 XXX * 32:46 238 0 XXX * 0:00 0 0 XXX * 0:00 0 3 XXX * 11:26 49 8 XXX * 46:33 264 17 XXX * 44:27 295 TOTAL 3 XXX * 3:05 3 71 XXX * 147:35 363 413 XXX * 899:56 3.331 85 XXX * 217:34 1.171 11 XXX * 37:39 255 0 XXX * 0:00 0 8 XXX * 9:21 18 10 XXX * 36:02 138 75 XXX * 372:53 1.181 35 XXX * 103:12 491 MURCIA C.VALENCIANA ARAGÓN
- XXX No se puede totalizar el número de incendios atendidos ya que en un mismo incendio pueden haber intervenido medios de distintas bases
BASE PAÍS VASCO CATALUÑA GALICIA ANDALUCÍA ASTURIAS CANTABRIA LA RIOJA
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016
AVANCE INFORMATIVO 29
Resumen de Actuación de los medios del MAPAMA por comunidad autónoma II. Aviones y Helicópteros de extinción. Año 2016
Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas TORREJON (precampaña) 2 1 4:20 5 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 TORREJON (campaña) 10 5 35:35 142 8 1 82:00 133 0 0 0:00 0 9 2 52:25 123 0 0 0:00 0 0 0 0:00 0 2 2 8:00 10 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 TORREJON (postcampaña) 2 1 5:30 15 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 3:40 8 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 LABACOLLA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 1:50 3 0 0 0:00 0 2 2 9:00 39 0 0 0:00 0 ZARAGOZA 1 1 3:40 15 0 0 0:00 0 4 1 15:45 33 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 3:50 6 POLLENSA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 6 5 15:40 142 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 MALAGA 0 0 0:00 0 4 1 44:25 81 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 LOS LLANOS 4 3 14:25 86 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 7:50 28 0 0 0:00 0 MATACAN 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 21 6 117:48 400 0 0 0:00 0 0 0 0:00 0 19 12 66:05 251 0 0 0:00 0 4 3 20:15 97 0 0 0:00 0 TALAVERA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 23 18 78:35 316 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 4 2 23:56 95 0 0 0:00 0 TOTAL CL-215T/CL-415 19 XXX * 63:30 263 12 XXX * 126:25 214 4 XXX * 15:45 33 53 XXX * 248:48 839 6 XXX * 15:40 142 0 XXX * 0:00 0 23 XXX * 79:35 272 0 XXX * 0:00 0 11 XXX * 61:01 259 1 XXX * 3:50 6 MATACÁN 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 12 7 52:51 0 0 0 0:00 0 0 0 0:00 0 5 5 13:13 0 0 0 0:00 0 3 3 2:16 0 0 0 0:00 0 MUCHAMIEL 1 1 2:04 0 0 0 0:00 0 0 0 0:00 0 2 1 7:20 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 TOTAL ACOs 1 XXX * 2:04 0 0 XXX * 0:00 0 0 XXX * 0:00 0 14 XXX * 60:11 0 0 XXX * 0:00 0 0 XXX * 0:00 0 5 XXX * 13:13 0 0 XXX * 0:00 0 3 XXX * 2:16 0 0 XXX * 0:00 0 XINZO DE LIMIA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 2 1 2:56 6 0 0 0:00 0 NOAIN 0 0 0:00 0 0 0 0:00 0 17 14 26:30 68 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 SON BONET 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 17 17 20:42 42 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 NIEBLA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 AMPURIABRAVA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 REUS (Aa) 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 MANISES (Aa) 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 2 1 5:04 20 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 ROSINOS (Aa) 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 59 33 142:50 396 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 LA GOMERA 0 0 0:00 0 6 1 31:20 51 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 AGONCILLO 0 0 0:00 0 0 0 0:00 0 8 2 18:19 43 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 8 5 10:15 15 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 TOTAL Airtractor 0 XXX * 0:00 0 6 XXX * 31:20 51 25 XXX * 44:49 111 0 XXX * 0:00 0 19 XXX * 25:46 62 0 XXX * 0:00 0 67 XXX * 153:05 411 0 XXX * 0:00 0 2 XXX * 2:56 6 0 XXX * 0:00 0 MUCHAMIEL 2 2 4:14 11 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 PALMA DEL RIO 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 TABUYO DEL MONTE 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 2:29 10 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 IBIAS 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 LAZA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 TOTAL KAMOV invierno 2 XXX * 4:14 11 0 XXX * 0:00 0 0 XXX * 0:00 0 0 XXX * 0:00 0 0 XXX * 0:00 0 0 XXX * 0:00 0 1 XXX * 2:29 10 0 XXX * 0:00 0 0 XXX * 0:00 0 0 XXX * 0:00 0 LA ALMORAIMA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 0:55 3 0 0 0:00 0 0 0 0:00 0 VILLARES JADRAQUE 7 5 16:19 81 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 1:27 4 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 LOS RODEOS 0 0 0:00 0 8 3 38:00 204 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 PLASENCIA DE CÁCERES 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 38 31 90:58 890 0 0 0:00 0 0 0 0:00 0 9 7 34:09 197 0 0 0:00 0 2 1 4:15 30 0 0 0:00 0 HUELMA 2 1 5:05 34 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 IBIAS 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 20 17 68:55 399 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 CARAVACA 4 3 9:11 74 0 0 0:00 0 0 0 0:00 0 3 1 18:20 86 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 PLASENCIA DEL MONTE 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 TOTAL KAMOV verano 13 XXX * 30:35 189 8 XXX * 38:00 204 0 XXX * 0:00 0 41 XXX * 109:18 976 0 XXX * 0:00 0 0 XXX * 0:00 0 30 XXX * 104:31 600 1 XXX * 0:55 3 2 XXX * 4:15 30 0 XXX * 0:00 0 TOTAL 35 XXX * 100:23 463 26 XXX * 195:45 469 29 XXX * 60:34 144 108 XXX * 418:17 1.815 25 XXX * 41:26 204 0 XXX * 0:00 0 126 XXX * 352:53 1.293 1 XXX * 0:55 3 18 XXX * 70:28 295 1 XXX * 3:50 6 CASTILLA Y LEÓN CEUTA PORTUGAL FRANCIA
- XXX No se puede totalizar el número de incendios atendidos ya que en un mismo incendio pueden haber intervenido medios de distintas bases
BASE CASTILLA LA MANCHA CANARIAS NAVARRA EXTREMADURA ILLES BALEARS MADRID
INCENDIOS FORESTALES 01/01/2016 - 31/12/2016
AVANCE INFORMATIVO 30
Resumen de Actuación de los medios del MAPAMA por comunidad autónoma. Helicópteros de transporte. Año 2016
Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas PINOFRANQUEADO 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 TABUYO DEL MONTE 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 TINEO 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 5 5 41 9:41:00 23 0 0 0 0:00:00 0 LAZA 0 0 0 0:00:00 0 0 0 0 0:00:00 0 1 1 9 1:15:00 5 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 RUENTE 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 6 6 45 10:30:00 67 TOTAL BRIF-i 0 XXX * 0 0:00:00 0 0 XXX * 0 0:00:00 0 1 XXX * 9 1:15:00 5 0 XXX * 0 0:00:00 0 5 XXX * 41 9:41:00 23 6 XXX * 45 10:30:00 67 DAROCA 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 CUENCA 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 LA IGLESUELA 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 PINOFRANQUEADO 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 LAZA 0 0 0 0:00:00 0 0 0 0 0:00:00 0 101 52 873 262:08:00 2.393 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 PUERTO EL PICO 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 TINEO 0 0 0 0:00:00 0 0 0 0 0:00:00 0 10 4 84 43:39:00 233 0 0 0 0:00:00 0 26 13 218 74:22:00 456 0 0 0 0:00:00 0 LUBIA 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 2 1 51 13:26:00 50 4 1 36 12:32:00 54 TABUYO DEL MONTE 0 0 0 0:00:00 0 0 0 0 0:00:00 0 8 3 68 22:18:00 94 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 PUNTAGORDA 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 TOTAL BRIF-A y B 0 XXX * 0 0:00:00 0 0 XXX * 0 0:00:00 0 119 XXX * 1.025 328:05:00 2.720 0 XXX * 0 0:00:00 0 28 XXX * 269 87:48:00 506 4 XXX * 36 12:32:00 54 TOTAL GENERAL 0 XXX * 0 0:00:00 0 0 XXX * 0 0:00:00 0 120 XXX * 1.034 329:20:00 2.725 0 XXX * 0 0:00:00 0 33 XXX * 310 97:29:00 529 10 XXX * 81 23:02:00 121 Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas PINOFRANQUEADO 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 TABUYO DEL MONTE 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 TINEO 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 LAZA 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 RUENTE 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 TOTAL BRIF-i 0 XXX * 0 0:00:00 0 0 XXX * 0 0:00:00 0 0 XXX * 0 0:00:00 0 0 XXX * 0 0:00:00 0 0 XXX * 0 0:00:00 0 0 XXX * 0 0:00:00 0 DAROCA 0 0 0 0:00:00 0 0 0 0 0:00:00 0 18 5 178 82:24:00 319 32 15 273 69:26:00 405 0 0 0 0:00:00 0 0 0 0 0:00:00 0 CUENCA 0 0 0 0:00:00 0 0 0 0 0:00:00 0 14 5 129 72:15:00 355 0 0 0 0:00:00 0 25 12 253 87:25:00 487 0 0 0 0:00:00 0 LA IGLESUELA 0 0 0 0:00:00 0 0 0 0 0:00:00 0 4 1 17 26:04:00 246 0 0 0 0:00:00 0 16 8 138 35:37:00 290 0 0 0 0:00:00 0 PINOFRANQUEADO 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 LAZA 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 PUERTO EL PICO 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 1 1 9 2:31:00 20 0 0 0 0:00:00 0 TINEO 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 LUBIA 0 0 0 0:00:00 0 0 0 0 0:00:00 0 4 1 18 24:20:00 167 0 0 0 0:00:00 0 2 1 18 3:52:00 13 0 0 0 0:00:00 0 TABUYO DEL MONTE 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 PUNTAGORDA 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 15 2 17 70:21:00 370 TOTAL BRIF-A y B 0 XXX * 0 0:00:00 0 0 XXX * 0 0:00:00 0 40 XXX * 342 205:03:00 1.087 32 XXX * 273 69:26:00 405 44 XXX * 418 129:25:00 810 15 XXX * 17 70:21:00 370 TOTAL GENERAL 0 XXX * 0 0:00:00 0 0 XXX * 0 0:00:00 0 40 XXX * 342 205:03:00 1.087 32 XXX * 273 69:26:00 405 44 XXX * 418 129:25:00 810 15 XXX * 17 70:21:00 370 Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas PINOFRANQUEADO 0 0 0 0:00:00 0 1 1 9 2:51:00 13 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 TABUYO DEL MONTE 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 TINEO 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 LAZA 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 RUENTE 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 TOTAL BRIF-i 0 XXX * 0 0:00:00 0 1 XXX * 9 2:51:00 13 0 XXX * 0 0:00:00 0 0 XXX * 0 0:00:00 0 0 XXX * 0 0:00:00 0 0 XXX * 0 0:00:00 0 DAROCA 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 CUENCA 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 LA IGLESUELA 0 0 0 0:00:00 0 12 2 112 63:14:00 222 0 0 0 0:00:00 0 0 0 0 0:00:00 0 15 7 149 50:06:00 289 0 0 0 0:00:00 0 PINOFRANQUEADO 0 0 0 0:00:00 0 41 15 420 146:25:00 1.134 0 0 0 0:00:00 0 0 0 0 0:00:00 0 9 5 97 25:11:00 297 6 3 51 13:37:00 77 LAZA 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 4 2 60 18:57:00 115 0 0 0 0:00:00 0 PUERTO EL PICO 0 0 0 0:00:00 0 3 2 27 15:45:00 92 0 0 0 0:00:00 0 0 0 0 0:00:00 0 20 19 189 51:16:00 356 0 0 0 0:00:00 0 TINEO 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 10 5 72 20:06:00 108 0 0 0 0:00:00 0 LUBIA 0 0 0 0:00:00 0 4 1 34 24:06:00 75 0 0 0 0:00:00 0 0 0 0 0:00:00 0 16 8 134 31:58:00 168 0 0 0 0:00:00 0 TABUYO DEL MONTE 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 54 24 526 182:53:00 1.031 0 0 0 0:00:00 0 PUNTAGORDA 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 0 0 0 0:00:00 0 TOTAL BRIF-A y B 0 XXX * 0 0:00:00 0 60 XXX * 593 249:30:00 1.523 0 XXX * 0 0:00:00 0 0 XXX * 0 0:00:00 0 128 XXX * 1.227 380:27:00 2.364 6 XXX * 51 13:37:00 77 TOTAL GENERAL 0 XXX * 0 0:00:00 0 61 XXX * 602 252:21:00 1.536 0 XXX * 0 0:00:00 0 0 XXX * 0 0:00:00 0 128 XXX * 1.227 380:27:00 2.364 6 XXX * 51 13:37:00 77 BASE PAÍS VASCO CATALUÑA GALICIA ANDALUCÍA ASTURIAS CANTABRIA CANARIAS BASE NAVARRA EXTREMADURA ILLES BALEARS MADRID CASTILLA Y LEÓN PORTUGAL BASE LA RIOJA MURCIA C. VALENCIANA ARAGÓN CASTILLA LA MANCHA
FD06126 | 2017_西班牙_MITECO_森林火灾年报_火灾报告.pdf
分类:06_境外及港澳台调查报告 | 年份:2017 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
Los Incendios Forestales en España BRIF Laza en el incendio de Vilariño do Conso 11/10/2017 (Orense) 1 enero – 31 diciembre 2017 Avance Informativo
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 1 Índice
- Antecedentes ................................................................................................ 3
- 1 Objeto del informe ............................................................................................. 3
- 2 Marco Legal ....................................................................................................... 3
- Daños producidos en 2017 por los incendios forestales ......................... 4
- 1 Número de incendios y superficies afectadas ................................................ 4
- 2 Grandes Incendios Forestales (GIF) ................................................................ 7
- El programa de Ministerio de Agricultura y Pesca, Alimentación y Medio
Ambiente para la defensa contra los incendios forestales ........................ 10 3.1 Actuaciones de Coordinación y Planificación .............................................. 10 3.1.1 Comisión Paritaria, Ministerio de Defensa – Ministerio de Agricultura y Pesca, Alimentación y Medio Ambiente .......................................................................................... 10 3.1.2 Comité de Lucha contra Incendios Forestales (CLIF)................................................ 10 3.1.3 Centro de Coordinación de la Información Nacional sobre Incendios Forestales (CCINIF) .............................................................................................................................. 12 3.2 Actuaciones de Prevención ............................................................................ 13 3.2.1 Formación en Defensa contra incendios forestales ................................................... 13 3.2.2 Equipos de Prevención Integral (EPRIF) ................................................................... 13 3.2.3 Brigadas de Labores Preventivas (BLP) .................................................................... 14 3.3 Actuaciones de Extinción ............................................................................... 14 3.3.1 Medios humanos: Brigadas de Refuerzo contra incendios forestales (BRIF) ........... 14 3.3.2 Medios aéreos: aviones anfibios, helicópteros bombarderos, helicópteros de transporte ............................................................................................................................ 16 3.4. Cooperación Internacional ............................................................................ 19
- Anexos ........................................................................................................ 20
- 1 Avance estadístico Incendios Forestales (1 enero al 31 de diciembre) ...... 20
.2. Distribución de los medios del MAPAMA 2017 .............................................. 22 4.3. Actividad de los medios del MAPAMA 2017 ................................................. 26
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 2 Este informe ha sido elaborado por el equipo de estadísticas del Área de Defensa contra Incendios Forestales Ministerio de Agricultura y Pesca, Alimentación y Medio Ambiente Madrid, Febrero de 2017
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 3
- Antecedentes
- 1 Objeto del informe
Este informe constituye el avance estadístico de incendios forestales del año 2017. Recoge las actuaciones realizadas por el Ministerio de Agricultura y Pesca, Alimentación y Medio Ambiente (MAPAMA) en la defensa contra incendios forestales así como las condiciones de peligro y la ocurrencia de incendios registrada durante el periodo comprendido desde el 1 de enero al 31 de diciembre del año 2017. El objeto de este documento es proporcionar la información más actualizada a los miembros del Comité de Lucha contra los Incendios Forestales (CLIF), la Comisión Interministerial de Coordinación para la Prevención y Lucha contra los Incendios Forestales, los servicios administrativos autonómicos competentes y el público en general. Está disponible para su consulta en el siguiente enlace ubicado en la página Web del MAPAMA, junto con las memorias estadísticas de los incendios forestales sucedidos en España desde 1968. http://www.mapama.gob.es/es/desarrollo-rural/estadisticas/Incendios_default.aspx
- 2 Marco Legal
El Ministerio de Agricultura y Pesca, Alimentación y Medio Ambiente desarrolla sus actuaciones en la defensa y lucha contra los incendios forestales, bajo el marco legal establecido por las siguientes disposiciones: Ley 43/2003, de 21 de noviembre, de Montes. Real Decreto-Ley 11/2005, de 22 de julio, por el que se aprueban medidas urgentes en materia de incendios forestales. Acuerdo del Consejo de Ministros de 7 de octubre de 2005 por el que se crea la Unidad Militar de Emergencias. Ley 10/2006, de 28 de abril, por la que se modifica la Ley 43/2003, de 21 de noviembre, de Montes. Real Decreto 1424/2008, de 14 de agosto, por el que se determinan la composición y las funciones de la Comisión Estatal para el Patrimonio Natural y la Biodiversidad, se dictan las normas que regulan su funcionamiento y se establecen los comités especializados adscritos a la misma. Ley 3/2010, de 10 de marzo, por la que se aprueban medidas urgentes para paliar los daños producidos por los incendios forestales y otras catástrofes naturales ocurridos en varias Comunidades Autónomas. Real Decreto 1097/2011, de 22 de julio, por el que se aprueba el Protocolo de Intervención de la Unidad Militar de Emergencias. Real Decreto 401/2012, de 17 de febrero, por el que se desarrolla la estructura orgánica básica del Ministerio de Agricultura, Alimentación y Medio Ambiente.
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 4 Real Decreto 893/2013, de 15 de noviembre, por el que se aprueba la Directriz básica de planificación de protección civil de emergencia por incendios forestales. Resolución de 31 de octubre de 2014, de la Subsecretaría, por la que se publica el Acuerdo del Consejo de Ministros de 24 de octubre de 2014, por el que se aprueba el Plan Estatal de Protección Civil para Emergencias por Incendios Forestales. Ley 21/2015, de 20 de julio, por la que se modifica la Ley 43/2003, de 21 de noviembre, de Montes.
- Daños producidos en 2017 por los incendios forestales
- 1 Número de incendios y superficies afectadas
La estadística provisional del periodo comprendido entre el 1 de enero y el 31 de diciembre del año 2017, adjunta como anexo a este informe, se elabora con la información que envían las comunidades autónomas con periodicidad semanal durante la campaña de verano, y mensual para el resto del año. El número total de siniestros ha aumentado un 11,57% con respecto a la media del último decenio, con un aumento del 5,80 % en el número de conatos (superficie ≤1 ha) y del 23,05 % en el de incendios (superficie > 1ha) respectivamente. Ha sido el tercer año con mayor número de siniestros del último decenio. MEDIA DEL DECENIO 2007-2017 (01/01/-31/12) AÑO 2017 (01/01-31/12) Nº CONATOS ( ha) 8.228 8.705 Nº INCENDIOS (≥1 ha) 4.135 5.088 TOTAL SINIESTROS 12.363 13.793 Como puede apreciarse en el gráfico siguiente, el número de siniestros del año 2017 se encuentra por debajo de los peores años de siniestralidad del decenio, que son 2009, 20011 y 2012.
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 5 En cuanto a las superficies afectadas se produce un aumento con respecto a la media, siendo de un 145 % en la superficie arbolada y de un 94% en superficie forestal. El año 2017 ocupa el segundo lugar del decenio en superficie afectada. MEDIA DEL DECENIO 2007-2017 (01/01/-31/12) AÑO 2017 (01/01-31/12) S. ARBOLADA (ha) 27.226,41 66.839,02 S. FORESTAL (ha) 91.846,74 178.233,93
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 6 Dada la heterogeneidad del territorio nacional en cuanto a meteorología, topografía, vegetación y factores socioeconómicos existentes, tradicionalmente se aborda el análisis de la siniestralidad de incendios forestales de forma regionalizada de acuerdo a cuatro zonas con homogéneas. Las zonas definidas son las siguientes: NOROESTE: Comprende las comunidades autónomas de Galicia, Asturias, Cantabria y País Vasco y las provincias de León y Zamora. MEDITERRÁNEO: Comprende las comunidades autónomas costeras con el mar Mediterráneo, incluyendo sus provincias interiores. CANARIAS: Incluye todo el archipiélago canario. COMUNIDADES INTERIORES: Comprende las provincias del resto de comunidades no costeras, excepto León y Zamora. Teniendo en cuenta esta zonificación se aprecia que la región Noroeste es la que sufre un mayor número de siniestros, con un 51,57% del total anual. Le sigue la región de las Comunidades Interiores, con el 32,05 %, la zona del Mediterráneo y finalmente Canarias.
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 7 Teniendo en cuenta la superficie forestal afectada la región Noroeste representa el 73,84% del total, seguida por la región de las Comunidades Interiores, la región del Mediterráneo y, con valores muy inferiores, Canarias.
- 2 Grandes Incendios Forestales (GIF)
Según la estadística provisional proporcionada por los servicios competentes de las administraciones autonómicas, durante 2017 tuvieron lugar 56 Grandes Incendios Forestales (GIF), categoría que incluye aquellos incendios que superan las 500 hectáreas forestales afectadas.
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 8 Los GIF se repartieron durante la campaña de verano salvo uno que se produjo fuera de este periodo. En total los GIF registrados supusieron, según se recoge en la tabla adjunta, un 54,96% de la superficie total afectada y un 0,41% del total de siniestros ocurridos. Provincia Municipio Fecha (día/mes) Superficie Forestal (ha) Salamanca Candelario 25-ene. 516,60 León Ponferrada 19-abr. 1.251,04 León Benuza 20-abr. 798,34 Asturias Allande 20-abr. 746,46 Asturias Ibias 20-abr. 647,79 Asturias Grandas de Salime 20-abr. 590,49 Huelva Moguer 24-jun. 7.517,88 Cáceres Calzadilla 24-jun. 606,81 Valencia Gátova 28-jun. 1.181,41 Huelva Minas de Riotinto 3-jul. 739,72 Albacete Yeste 27-jul. 3.074,43 Zamora Pino del Oro 29-jul. 2.355,69 Cuenca Campillo de Altobuey 31-jul. 1.057,00 Ourense Verín 3-ago. 1.372,18 Jaén Segura de la Sierra 3-ago. 682,65 Ávila Navarredonda de Gredos 7-ago. 541,22 León Encinedo 21-ago. 9.820,66 Salamanca / Ávila Puente del Congosto / Medinilla 24-ago. 1.719,95 Ávila Hoyocasero 26-ago. 924,04 Zamora Fermoselle 26-ago. 1.632,44 Huelva/Sevilla La Granada de Riotinto 8-sep. 2.956,07 Sevilla Almadén de la Plata 8-sep. 977,14 Zamora Vegalatrave 9-sep. 527,26 Las Palmas Tejeda (Isla de Gran Canaria) 20-sep. 1.937,00 Ourense Lobios 9-oct. 670,00 Asturias Ibias 9-oct. 2.700,00 Asturias Degaña 11-oct. 1.950,00
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 9 León Palacios del Sil 12-oct. 573,50 León Villablino 13-oct. 719,44 Lugo Cervantes 12-oct. 864,00 Lugo Cervantes 13-oct. 1.785,00 Asturias Allande 14-oct. 661,06 Asturias Ibias 14-oct. 3.379,00 Ourense Lobios 14-oct. 3.425,48 Pontevedra Tui 15-oct. 865,37 Ourense Chandrexa de Queixa 15-oct. 741,03 Ourense Baños de Molgas 15-oct. 1.599,97 Ourense Melón 15-oct. 5.965,86 Ourense San Cristovo de Cea 15-oct. 1.520,34 Asturias Cangas de Narcea 15-oct. 962,90 Asturias Allande 15-oct. 553,80 Ourense A Gudiña 15-oct. 1.809,14 Ourense Esgos 15-oct. 573,03 Ourense Maceda 15-oct. 526,36 Ourense Parada de Sil 15-oct. 1.275,62 Pontevedra Salvaterra do Miño 15-oct. 770,14 Pontevedra Caldas de Reis 15-oct. 1.067,87 Pontevedra Gondomar 15-oct. 1.384,92 Pontevedra Nigrán 15-oct. 1.483,25 Pontevedra As Neves 15-oct. 2.818,49 Pontevedra Ponteareas 15-oct. 8.877,79 Pontevedra Ponteareas 15-oct. 645,18 Pontevedra Mondariz 15-oct. 568,32
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 10 León Benuza 15-oct. 1.521,76 Lugo Negueira de Muñiz 16-oct. 1.104,00 Castellón Culla 29-dic. 535,20 SUPERFICIE FORESTAL AFECTADA 98.072,09 La región geográfica Noroeste fue la más castigada por los GIF, al ser el escenario del 73,21 % de ellos y del 74,54% de la superficie incendiada por los mismos. Sólo en el mes de octubre se produjeron 31 GIF (el 55% del total anual), todos ellos en la región Noroeste
- El programa de Ministerio de Agricultura y Pesca, Alimentación
y Medio Ambiente para la defensa contra los incendios forestales
- 1 Actuaciones de Coordinación y Planificación
Comprende las acciones de coordinación técnica realizadas en 2017 por este departamento junto con las diferentes administraciones públicas competentes en la defensa y lucha contra los incendios forestales. 3.1.1 Comisión Paritaria, Ministerio de Defensa – Ministerio de Agricultura y Pesca, Alimentación y Medio Ambiente Durante el año 2017 se celebraron dos reuniones de la Comisión Paritaria encargada de coordinar las necesidades de operatividad, mantenimiento y disponibilidad de los aviones Canadair operados por el 43 Grupo de las Fuerzas Aéreas. Se celebraron sendas reuniones, el 19 de enero y 4 de diciembre respectivamente, para acordar el despliegue de los aviones, así como analizar aspectos de la campaña 2017. 3.1.2 Comité de Lucha contra Incendios Forestales (CLIF) Es un Comité técnico para la coordinación entre las administraciones competentes en la defensa contra los incendios forestales, está presidido por el Subdirector General de Silvicultura y Montes del MAPAMA y se reúne dos veces al año, antes y después de la campaña estival. El 5 de junio de 2017 tuvo lugar la reunión de pre-campaña del CLIF. En dicha reunión se abordaron los siguientes asuntos: o Intervención Agencia Estatal de Seguridad Aérea (AESA) o Información campaña incendios forestales 2017.
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 11 o Intervención AGE: UME, 43G, MAPAMA. o Intervención otras Administraciones. o CCAA: principales novedades o Intervención Dirección General de Protección Civil y Emergencias (M. Interior). o Mecanismo Europeo de Protección Civil, Módulos. o Misión de incendios forestales en Chile 2017 o Módulo ACT Castilla La Mancha. o Servicio de Cartografía de Emergencias Copérnico o Proyectos de Incendios Forestales, financiados por el EUCP Mechanism. o Información sobre los grupos de trabajo del CLIF o GT Información o GT Prevención o GT Seguridad en la extinción o GT SMI y acreditación de la formación o GT Criterios de despliegue de medios de extinción o GT Interfaz urbano forestal Asimismo el día 21 de noviembre de 2017 tuvo lugar la reunión post-campaña del CLIF, en la que se trataron los siguientes asuntos: o Información de AESA sobre avances del Grupo de trabajo GHETA o Información de la Dirección General de Protección Civil y Emergencias o Análisis de la campaña de extinción de incendios forestales 2017 o Cada Administración pública intervino para detallar las incidencias y las áreas de mejora para la extinción de los incendios forestales. o Grupos de Trabajo del CLIF: novedades o GT información o GT prevención o GT seguridad o GT SMI y acreditación formación o GT criterios de despliegue de medios de extinción o GT interfaz urbano forestal o Recomendaciones de la Comisión de Investigación de Accidentes e Incidentes de Aviación Civil (CIAIAC). o Directrices definición ZAR. o PLAN ACTUACION DEL SECTOR FORESTAL. Estrategia Nacional de Prevención de Incendios Forestales.
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 12 o Información del Plan Nacional de Emergencias y Gestión de Riesgos en el Patrimonio Cultural (PNEGR) por la Dirección General de Bellas Artes y Patrimonio. 3.1.3 Centro de Coordinación de la Información Nacional sobre Incendios Forestales (CCINIF) Las funciones desarrolladas por el CCINIF, encomendadas por el Real Decreto-Ley 11/2005, para facilitar la coordinación con el resto de administraciones públicas competentes, son las siguientes: Canalizar de forma centralizada y poner a disposición del conjunto de las Administraciones públicas competentes, en tiempo real, toda la información de que dispongan las distintas Administraciones públicas en relación con la evolución del riesgo de incendios forestales, los medios materiales, técnicos y personales disponibles en cada momento y los incendios forestales, una vez que se produzcan. La información de los siniestros que se producen y los medios estatales del MAPAMA que los atienden se actualiza tres veces al día en la página web del Ministerio. Diariamente se publican el mapa de riesgo diario y las intervenciones de los medios del Ministerio en los incendios forestales sucedidos el día anterior. Ejemplo del mapa de riesgo publicado diariamente por el CCINIF
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 13 Se puede consultar la información diaria relativa a actuaciones y riesgo de incendio en el siguiente enlace: http://www.mapama.gob.es/es/desarrollo-rural/temas/politica-forestal/incendios- forestales/extincion/default.aspx
- 2 Actuaciones de Prevención
- 2.1 Formación en Defensa contra incendios forestales
Durante el año 2017 el MAPAMA realizó los siguientes cursos de formación
destinados a profesionales que trabajan en la defensa contra incendios forestales:
Curso de drones y su utilización en incendios forestales, celebrado en Madrid
entre el 23 y el 25 de mayo.
Curso Superior de Seguridad e Investigación de Accidentes en Incendios
Forestales, celebrado en Madrid del 20 al 24 de noviembre
Curso de Sistema de Mando de Incidentes (Incident Command System) ICS, celebrado en Madrid del 27 al 30 de noviembre. 3.2.2 Equipos de Prevención Integral (EPRIF) En 2017 los EPRIF estuvieron operativos desde el 18 de enero hasta el 30 de mayo y retomaron los trabajos desde el 2 de noviembre hasta el 23 de diciembre, completando un máximo de 6 meses de trabajo al finalizar el año. Durante este periodo los EPRIF han trabajado mayormente en la realización de actividades formativas y reuniones con diversos colectivos, principalmente ganaderos, agricultores, cazadores, asociaciones de vecinos, representantes de ayuntamientos o profesores, con el objeto de conciliar intereses y concienciar en la prevención de incendios forestales. Entre las actuaciones realizadas durante el primer periodo de 2017 destaca el tratamiento de 1.147 hectáreas mediante la ejecución de 198 quemas controladas, todas ellas conducentes a reducir el riesgo de incendios forestales mediante la disminución del combustible forestal y la creación de discontinuidades en la vegetación, al tiempo que se alcanzan otros objetivos como la mejora de pastos, favorecer el hábitat de diversas especies o mejorar la accesibilidad en el monte, entre otros. Sin embargo se prepararon un total de 679 parcelas para la realización de quemas, aunque las condiciones meteorológicas no permitieron la ejecución de todas ellas. Para la ejecución de las quemas controladas los EPRIF situados en Huesca, Tabuyo (León), Cangas del Narcea (Asturias), Pola de Lena (Asturias) y Gredos (Ávila) recibieron ocasionalmente el apoyo de las Brigadas de Labores Preventivas del MAPAMA con bases próximas a la zona de actuación.
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 14 3.2.3 Brigadas de Labores Preventivas (BLP) Las Brigadas de Labores Preventivas del MAPAMA actuaron, en colaboración con las administraciones autonómicas, desde principios de año hasta el comienzo de la campaña de verano. Una vez terminada la campaña de verano se retomaron los trabajos de prevención, que finalizaron a mediados del mes de diciembre, ampliando así el periodo de trabajo a unos 11 meses. Durante estos dos periodos de trabajo realizaron trabajos de prevención de incendios en más de 1.475 hectáreas de terrenos forestales que incluyeron clareos, podas y desbroces fundamentalmente. En total más de 400 trabajadores distribuidos en las 10 Brigadas de Labores Preventivas ejecutaron trabajos de selvicultura preventiva en montes próximos al entorno de las bases BRIF donde desarrollan su trabajo en las campañas de extinción de incendios forestales. Como se ha señalado las BLP trabajan ocasionalmente en apoyo a los EPRIF en la ejecución de quemas prescritas.
- 3 Actuaciones de Extinción
- 3.1 Medios humanos: Brigadas de Refuerzo contra incendios
forestales (BRIF) El MAPAMA despliega cinco BRIF-i durante la campaña de invierno-primavera, en el norte y oeste de la Península, y diez BRIF durante la campaña de verano distribuidas por todo el territorio nacional, como se recoge en los mapas anexos. En la campaña de verano las BRIF se componen de tres turnos formados cada uno por 2 capataces y 14 especialistas, bajo el mando de 1 técnico; para el transporte y apoyo a la extinción cuentan con dos helicópteros de 1.500 litros de capacidad. En el Puerto del Pico (Ávila) se dispone de una brigada tipo BRIF-B, que es de menor tamaño y de composición igual a las brigadas de la campaña de invierno BRIF-i, consistente en turnos de 7 especialistas, 1 capataz y 1 técnico dotados de un sólo helicóptero de 1.500 litros para el transporte y apoyo a la extinción.
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 15 BRIF Puerto el Pico en el incendio de Navarredonda de Gredos 07/08/2017 (Ávila) Estas unidades helitransportadas de personal altamente especializado en la extinción de incendios forestales, pueden actuar en cualquier punto del territorio nacional donde sean necesarios. El personal de las BRIF recibe una formación y entrenamiento continuados que les permiten actuar en situaciones de máxima exigencia, asumiendo, en la mayoría de las ocasiones, los sectores más complicados del incendio. El dominio de todas las técnicas de extinción, incluido el empleo del contrafuego, es imprescindible en su actuación. En la campaña de 2017 las BRIF trabajaron 5.617 horas en incendio en 455 intervenciones, realizando un total de 420.272 metros de longitud de línea combatida. Las BRIF con más actuaciones durante esta campaña ha sido la de Laza (Ourense) con 84 intervenciones sumando la campaña de verano e invierno
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 16 3.3.2 Medios aéreos: aviones anfibios, helicópteros bombarderos, helicópteros de transporte El MAPAMA cuenta con un despliegue de medios aéreos gestionado desde el Área de Defensa contra Incendios Forestales, que cubre la superficie forestal nacional durante todo el año. Durante los dos periodos de mayor ocurrencia de incendios forestales, campañas de invierno y verano, se refuerza el número de medios disponibles. Actuación del Helicóptero de Brif-Tineo en el incendio de Degaña 11/10/2017 (Asturias)
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 17 Durante el año 2017, los medios aéreos del MAPAMA realizaron un total de 1.944 intervenciones en la extinción de incendios forestales, en apoyo a los dispositivos de las respectivas comunidades autónomas, con la distribución que se detalla en la siguiente tabla. En total volaron 6.641 horas en incendio, realizando 30.401 descargas sobre las llamas. En la tabla siguiente se detalla la distribución de actuaciones por comunidades autónomas y otros países: Comunidad Autónoma Incendios Intervenciones Horas voladas en incendio Descarga s Andalucía 70 170 526:03 2.089 Aragón 27 59 183:24 526 Asturias, Principado de 98 185 535:56 3.131 Balears, Illes 15 19 26:05 76 Canarias 2 7 17:56 68 Cantabria 39 40 80:51 581 Castilla León 147 529 1854:57 9.241 Castilla-La Mancha 36 129 602:17 2.355 Cataluña 17 50 134:42 360 Comunitat Valenciana 5 23 132:05 391 Extremadura 44 102 375:50 2.280 Galicia 192 574 1407:47 6.840 Madrid, Comunidad de 2 2 4:05 13 Murcia, Región de 6 11 35:15 201 Navarra, Comunidad Foral de 12 28 46:46 95 País Vasco Sin intervención Rioja, La 10 31 46:46 95 Ceuta Sin intervención Melilla Sin intervención Total Nacional 722 1.944 6641:10 30.401 Portugal 31 101 574:16 1.944
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 18 INTERVENCIONES DE LOS MEDIOS DEL MAPAMA
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 19
- 4. Cooperación Internacional
Durante el 2017 el MAPAMA participó en las siguientes reuniones internacionales:
14th International Wildland Fire Safety Summit y Congreso Internacional de Fuegos Prescritos, celebrado en Barcelona entre el 31 de enero y el 3 de
febrero
Reunión del International Liaison Committee de las Conferencias Internacionales sobre incendios (Wildfire), celebrada en Washington DC
(Estados Unidos) el 1 y 2 de febrero
Reunión para el asesoramiento en la elaboración de la Estrategia nacional de prevención y lucha contra incendios forestales del Haut Commissariat des Eaux et Forêts et à la Lutte Contre la Désertification del Reino de Marruecos,
celebrada en Aix en Provence (Francia) el 28 de marzo
36ª Reunión del Grupo de Expertos en Incendios Forestales de la Comisión
Europea, celebrada en Bruselas (Bélgica) el 9 de octubre
Aerial Firefighting Conference, celebrada en Nimes (Francia) el 17 y 18 de
octubre
Presencia en el ejercicio internacional European Firefighting Table Top Exercise, organizado en el marco del proyecto SVAROG 2017 en Croacia entre el 14 y el 16 noviembre
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 20
- Anexos
- 1 Avance estadístico Incendios Forestales (1 enero al 31 de diciembre)
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 21 Datos por comunidades autónomas. Año 2017 Conatos Incendios Forestal < 1 ha
=1 ha
Arbolada Matorral y M.Bajo Total Herbácea % ARBOLADA % FORESTAL Alava 15 4 5,78 5,44 11,22 3,95 0,005 0,008 Guipúzcoa 23 3 8,83 29,26 38,09 0,00 0,007 0,026 Vizcaya 23 11 4,42 40,52 44,94 32,72 0,001 0,049 PAIS VASCO 61 18 19,03 75,22 94,25 36,67 0,005 0,027 Barcelona 214 33 365,38 64,98 430,35 22,34 0,101 0,092 Girona 90 4 15,76 5,40 21,17 0,08 0,003 0,005 Lleida 102 30 68,74 392,49 461,23 120,08 0,031 0,079 Tarragona 143 18 76,89 131,86 208,75 10,00 0,005 0,074 CATALUÑA 549 85 526,76 594,73 1.121,49 152,50 0,035 0,066 A Coruña 485 129 1.116,87 1.140,07 2.256,94 0,00 0,234 0,447 Lugo 435 202 3.282,58 4.955,85 8.238,43 0,00 1,123 1,250 Ourense 897 488 11.428,69 18.880,54 30.309,23 0,00 5,241 5,253 Pontevedra 485 128 13.450,19 7.646,88 21.097,07 0,00 0,962 7,045 GALICIA (*) 2.302 947 29.278,33 32.623,34 61.901,67 0,00 2,094 3,033 Almería 56 9 0,05 118,25 118,30 0,00 0,000 0,020 Cadiz 102 7 14,24 35,56 49,80 0,00 0,007 0,014 Córdoba 83 23 23,26 85,30 108,56 0,00 0,005 0,016 Granada 97 27 46,19 263,41 309,60 0,00 0,016 0,048 Huelva 106 49 8.454,88 3.729,74 12.184,62 0,00 1,566 1,542 Jaén 154 18 642,40 155,94 798,34 0,00 0,156 0,127 Málaga 79 31 101,10 287,76 388,86 0,00 0,061 0,108 Sevilla 84 43 1.070,92 579,16 1.650,08 0,00 0,384 0,385 ANDALUCIA () 761 207 10.353,04 5.255,12 15.608,16 0,00 0,412 0,349 ASTURIAS 723 1.006 4.419,64 23.263,48 27.683,12 106,23 0,995 3,607 CANTABRIA 101 641 3.073,47 7.764,41 10.837,88 467,02 1,492 3,103 LA RIOJA () 64 17 69,97 170,64 240,61 0,00 0,044 0,077 MURCIA 116 16 141,50 19,80 161,30 5,04 0,052 0,033 Alicante 73 7 22,89 16,94 39,83 0,00 0,021 0,015 Castellón 49 12 1.084,20 619,93 1.704,13 0,00 0,476 0,402 Valencia 193 14 98,88 55,34 154,22 0,00 0,034 0,026 COM. VALENCIANA 315 33 1.205,97 692,21 1.898,18 0,00 0,193 0,150 Huesca 93 29 109,96 330,78 440,74 0,00 0,021 0,047 Teruel 107 16 87,21 111,05 198,26 0,00 0,017 0,021 Zaragoza 159 60 59,06 209,62 268,68 0,00 0,019 0,036 ARAGÓN () 359 105 256,23 651,45 907,68 0,00 0,019 0,035 Albacete 86 19 3.093,83 108,14 3.201,97 12,23 0,798 0,515 Ciudad Real 55 53 108,28 277,53 385,81 261,32 0,023 0,073 Cuenca 128 32 1.316,64 20,04 1.336,68 43,05 0,210 0,170 Guadalajara 108 23 230,19 64,14 294,33 35,16 0,046 0,043 Toledo 215 118 81,53 291,29 372,82 388,12 0,027 0,148 CASTILLA LA MANCHA 592 245 4.830,47 761,14 5.591,61 739,88 0,210 0,176 Las Palmas de Gran Canaria 39 4 774,92 1.165,27 1.940,19 7,48 4,292 0,628 S.C. de Tenerife 41 0 0,48 0,96 1,44 0,51 0,000 0,001 CANARIAS 80 4 775,40 1.166,23 1.941,63 7,99 0,635 0,344 NAVARRA 149 157 219,84 518,28 738,12 482,20 0,054 0,205 Badajoz 184 230 612,32 854,89 1.467,21 1.288,97 0,077 0,234 Cáceres 380 231 494,56 2.266,02 2.760,58 1.728,75 0,055 0,289 EXTREMADURA 564 461 1.106,88 3.120,91 4.227,79 3.017,72 0,066 0,266 ILLES BALEARS 84 14 49,60 87,20 136,80 31,20 0,028 0,076 MADRID 293 51 10,31 47,07 57,38 201,36 0,005 0,059 Avila 130 59 1.150,98 1.852,59 3.003,57 444,94 0,533 0,571 Burgos 187 62 275,09 327,48 602,57 99,31 0,062 0,088 León 331 470 5.411,50 14.229,44 19.640,94 2.481,61 1,114 1,957 Palencia 160 61 79,07 51,74 130,81 228,16 0,050 0,052 Salamanca 210 108 385,07 1.925,66 2.310,73 1.096,12 0,088 0,290 Segovia 74 20 926,69 3,15 929,84 47,65 0,415 0,281 Soria 104 16 27,43 19,93 47,36 90,68 0,007 0,008 Valladolid 116 37 32,21 5,80 38,01 146,75 0,028 0,026 Zamora 280 248 2.214,54 4.836,43 7.050,97 1.448,44 1,036 1,457 CASTILLA Y LEÓN 1.592 1.081 10.502,58 23.252,22 33.754,80 6.083,66 0,393 0,827 CEUTA 0 0 0,00 0,00 0,00 0,00 0,000 0,000 MELILLA 0 0 0,00 0,00 0,00 0,00 0,000 0,000 TOTAL 8.705 5.088 66.839,02 100.063,45 166.902,47 11.331,46 0,405 0,643 (*) Sin diferenciación entre superficie desarbolada herbácea y leñosa () Sin datos de superficie herbácea Forestal Leñosa Num. Siniestros respecto a la existente SUPERFICIES % SUPERFICIE PROVINCIA / COM. AUTONOMA
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 22
.2. Distribución de los medios del MAPAMA 2017
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 23
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 24
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 25
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 26
- 3. Actividad de los medios del MAPAMA 2017
Resumen de Actividad de Equipos de Prevención Integral en incendios forestales (EPRIF). Año 2017 Preparación parcelas Núm Tiempo Sup. Núm Tiempo Núm. Tiempo Sup. forestal Núm. Tiempo Sup. Forestal Asturias Centro 0 0:00 0,00 43 66:30 25 177:55 130,90 0 0:00 0,00 Asturias Este 0 0:00 0,00 45 89:45 27 170:45 127,99 0 0:00 0,00 Asturias Oeste 1 4:30 6,00 16 64:00 7 45:15 47,70 0 0:00 0,00 Ávila 5 7:11 89,10 29 123:51 0 0:00 0,00 0 0:00 0,00 Cáceres 4 16:25 2.434,00 9 39:50 5 33:40 54,65 2 16:30 5,40 Cantabria 1 0:40 5,00 67 130:20 4 15:20 11,47 0 0:00 0,00 Huesca 0 0:00 0,00 11 40:00 7 60:45 75,20 1 7:30 3,50 La Coruña 1 10:35 120,00 54 86:55 9 39:15 63,81 0 0:00 0,00 La Palma 0 0:00 0,00 28 73:40 5 34:40 2,38 0 0:00 0,00 La Rioja 0 0:00 0,00 25 88:30 1 6:00 1,15 0 0:00 0,00 León 0 0:00 0,00 23 114:00 21 189:28 180,07 0 0:00 0,00 Lugo 0 0:00 0,00 58 65:20 9 25:20 42,36 0 0:00 0,00 Navarra Este 0 0:00 0,00 40 72:32 19 101:09 136,05 2 0:23 0,00 Navarra Oeste 1 6:50 200,00 69 119:30 16 91:45 100,62 0 0:00 0,00 Orense 1 1:32 3,50 29 70:54 5 19:39 17,10 3 14:00 5,10 Pontevedra 1 2:30 2,30 58 81:56 24 73:08 70,83 5 34:30 6,50 Valencia 0 0:00 0,00 22 65:03 8 63:38 28,00 0 0:00 0,00 Zamora 1 0:41 15,90 53 98:47 6 29:45 57,71 0 0:00 0,00 TOTAL 16 50:54 2875,8 679 1491:23 198 1177:27 1.147,99 13 72:53 20,50 Núm. Tiempo Núm Tiempo Núm. Tiempo Núm. Tiempo Asturias Centro 0 0:00 13 10:30 29 75:15 3 17:00 Asturias Este 0 0:00 13 19:30 24 82:00 1 6:30 Asturias Oeste 0 0:00 0 0:00 27 86:15 3 13:30 Ávila 0 0:00 0 0:00 39 204:30 9 36:00 Cáceres 4 10:30 14 28:10 16 59:45 6 45:00 Cantabria 0 0:00 6 9:30 54 77:15 15 49:30 Huesca 0 0:00 15 25:00 24 73:00 4 21:30 La Coruña 0 0:00 60 33:09 58 55:55 3 8:10 La Palma 0 0:00 2 3:30 16 42:55 3 5:20 La Rioja 0 0:00 3 11:30 32 103:15 8 16:15 León 0 0:00 3 11:30 14 40:10 3 8:00 Lugo 0 0:00 5 9:15 84 111:25 6 6:25 Navarra Este 0 0:00 40 43:52 36 51:41 0 0:00 Navarra Oeste 0 0:00 14 10:00 10 34:15 1 1:00 Orense 0 0:00 7 6:00 46 67:45 9 17:40 Pontevedra 0 0:00 44 22:36 65 49:27 14 41:40 Valencia 0 0:00 3 12:00 27 86:15 8 53:26 Zamora 0 0:00 6 10:32 116 166:19 3 4:35 TOTAL 4 10:30 248 266:34 717 1467:22 99 351:31 11583:18 Otras actividades 656:45 581:15 608:38 474:23 557:15 699:00 Formación/Concienciación
- Otras actividades corresponden a trabajos de gabinete, rutas de vigilancia, asistencia a mercados de ganado, etc
685:55 734:15 469:22 711:40 Quema controlada EPRIF Asistencia a incendio Desbroce mecánico 589:00 664:55 768:50 722:30 Inv. de Causas EPRIF 522:00 Ev. lab. anteriores 832:50 Reuniones 681:20 623:25
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 27 Resumen de Actividad de las Brigadas de Refuerzo contra Incendios Forestales (BRIF). Año 2017 Ataque Directo y A. Indirecto Remate y otros Laza 01-mar 29-abr 30 26 106:39 64:40 4 2 12.163 775 Pinofranqueado 01-feb 01-abr 10 10 25:10 11:05 3 2 3.387 1.339 Ruente 01-mar 29-abr 57 54 166:47 94:51 5 3 30.184 920 Tabuyo del Monte 01-feb 01-abr 11 11 41:25 18:43 2 1 9.545 1.403 Tineo 01-mar 29-abr. 44 41 153:52 86:53 2 2 17.535 7.265 Total BRIF-i 152 XXX* 493:53 276:12 XXX* XXX* 72.814 11.702 Puerto el Pico 15-jun 14-oct 0 0 0:00 0:00 0 0 0 0 Total BRIF-B 0 XXX* 0:00 0:00 XXX* XXX* 0 0 Cuenca 15-jun 14-oct 25 20 368:34 86:33 6 4 11.619 11.307 Daroca 15-jun. 14-oct. 16 13 154:01 61:14 8 6 6.684 9.425 La Iglesuela 15-jun. 14-oct. 19 12 197:56 68:35 6 4 17.843 5.281 Laza 15-jun. 30-oct. 84 66 398:33 245:40 5 2 57.805 19.210 Lubia 1-jul. 30-oct. 13 10 224:28 69:32 7 4 11.845 1.860 Pinofranqueado 15-jun. 22-oct. 37 29 221:00 112:29 5 3 42.908 18.634 Puntagorda 15-jun. 14-oct. 2 2 28:08 4:28 2 1 160 160 Tabuyo del Monte 15-jun. 30-oct. 62 48 404:44 238:50 4 2 56.108 31.952 Tineo 1-jul. 30-oct. 45 29 3125:48 154:28 4 3 27.480 5.475 Total BRIF-A 303 XXX* 5123:12 1041:49 XXX* XXX* 232.452 103.304 455 XXX* 5617:05 1318:01 XXX* XXX* 305.266 115.006
- XXX No se puede totalizar el número de incendios atendidos ya que en un mismo incendio pueden haber intervenido medios de distintas bases
El nº de salidas contabiliza las salidas totales de la base en extinción de incendios. Hay más de una salida a un mismo incendio cuando en este trabajan varios turnos de brigadas Fecha inicio activ. BRIF * Fecha fin de actividad BRIF Nº salidas Nº incen.Tiempo total incendio *Periodo de formación: todas las brigadas reciben formación en la quincena anterior a la fecha de inicio de actividad. El nº de incendios contabiliza los incendios en los que ha intervenido la BRIF de la base El tiempo total en incendio computa desde la salida a regreso a base de la Brigada El tiempo real en extinción computa el tiempo dedicado al combate del fuego sin incluir tiempos de transporte, esperas, descansos, etc El Núm. Prov.y el Núm. CCAA indica el número de provincias y CCAA en las que ha intervenido en extinción cada base BRIF Long. Linea incluye longitud de frente combatido en metros, diferenciando dos grupos: 1.-trabajos de ataque directo e indirecto y 2.-labores de remate, liquidación u otros tipos de actuación Total BRIF T. real extinción Nº Prov. Nº CCAA Long. Línea (m.) BRIF
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 28 Resumen de actuación de las Brigadas de Refuerzo contra incendios Forestales (BRIF) por comunidad autónoma. Año 2017 Localización BRIF Num. Int.Num. IncT. ext. T. LíneaNum. Int.Num. Inc. T. ext. T. Línea Num. Int.Num. Inc. T. ext. T. Línea Num. Int.Num. Inc. T. ext. T. Línea Num. Int.Num. Inc. T. ext. T. Línea Num. Int.Num. Inc. T. ext. T. Línea Laza 0 0 0:00 0 0 0 0:00 0 19 19 27:13 6.642 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Pinofranqueado 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Ruente 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 14 12 24:42 5.427 40 39 65:22 23.752 Tabuyo del Monte 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Tineo 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 43 40 84:03 23.070 0 0 0:00 0 Total BRIF-i 0 XXX* 0:00 0 0 XXX* 0:00 0 19 XXX* 27:13 6.642 0 XXX* 0:00 0 57 XXX* 108:45 28.497 40 XXX* 65:22 23.752 Puerto el Pico 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Total BRIF-B 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 Cuenca 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Daroca 0 0 0:00 0 1 1 3:30 850 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 La Iglesuela 0 0 0:00 0 0 0 0:00 0 1 1 2:19 600 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Laza 0 0 0:00 0 0 0 0:00 0 72 62 198:49 63.419 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Lubia 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 6:40 1.050 0 0 0:00 0 Pinofranqueado 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Puntagorda 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Tabuyo del Monte 0 0 0:00 0 0 0 0:00 0 13 12 33:34 12.337 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Tineo 0 0 0:00 0 0 0 0:00 0 2 2 6:10 2.500 0 0 0:00 0 39 23 127:38 25.455 0 0 0:00 0 Total BRIF-A 0 XXX* 0:00 0 1 XXX* 3:30 850 88 XXX* 240:52 78.856 0 XXX* 0:00 0 40 XXX* 134:18 26.505 0 XXX* 0:00 0 Total BRIF 0 XXX* 0:00 0 1 XXX* 3:30 850 107 XXX* 268:05 85.498 0 XXX* 0:00 0 97 XXX* 243:03 55.002 40 XXX* 65:22 23.752 Localización BRIF Num. Int.Num. IncT. ext. T. LíneaNum. Int.Num. Inc. T. ext. T. Línea Num. Int.Num. Inc. T. ext. T. Línea Num. Int.Num. Inc. T. ext. T. Línea Num. Int.Num. Inc. T. ext. T. Línea Num. Int.Num. Inc. T. ext. T. Línea Laza 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Pinofranqueado 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Ruente 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Tabuyo del Monte 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Tineo 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Total BRIF-i 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 Puerto el Pico 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Total BRIF-B 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 Cuenca 0 0 0:00 0 1 1 5:20 2.434 3 1 20:08 1.490 0 0 0:00 19 16 51:21 14.272 0 0 0:00 0 Daroca 2 1 11:55 1.813 0 0 0:00 0 2 1 12:00 3.640 8 8 20:21 3.286 2 1 12:10 6.300 0 0 0:00 0 La Iglesuela 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 2 1 5:18 978 0 0 0:00 0 Laza 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Lubia 2 1 11:50 450 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 11:45 2.800 0 0 0:00 0 Pinofranqueado 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Puntagorda 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 2 2 4:28 320 Tabuyo del Monte 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Tineo 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Total BRIF-A 4 XXX* 23:45 2.263 1 XXX* 5:20 2.434 5 XXX* 32:08 5.130 8 XXX* 20:21 3.286 24 XXX* 80:34 24.350 2 XXX* 4:28 320 Total BRIF 4 XXX* 23:45 2.263 1 XXX* 5:20 2.434 5 XXX* 32:08 5.130 8 XXX* 20:21 3.286 24 XXX* 80:34 24.350 2 XXX* 4:28 320 Localización BRIF Num. Int.Num. IncT. ext. T. LíneaNum. Int.Num. Inc. T. ext. T. Línea Num. Int.Num. Inc. T. ext. T. Línea Num. Int.Num. Inc. T. ext. T. Línea Num. Int.Num. Inc. T. ext. T. Línea Num. Int.Num. Inc. T. ext. T. Línea Laza 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 11 7 37:27 6.296 0 0 0:00 0 Pinofranqueado 0 0 0:00 0 7 7 7:42 2.909 0 0 0:00 0 0 0 0:00 0 3 3 3:23 1.817 0 0 0:00 0 Ruente 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 3 3 4:47 1.925 0 0 0:00 0 Tabuyo del Monte 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 11 11 18:43 10.948 0 0 0:00 0 Tineo 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 2:50 1.730 0 0 0:00 0 Total BRIF-i 0 XXX* 0:00 0 7 XXX* 7:42 2.909 0 XXX* 0:00 0 0 XXX* 0:00 0 29 XXX* 67:10 22.716 0 XXX* 0:00 0 Puerto el Pico 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Total BRIF-B 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 Cuenca 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 2 2 9:44 4.730 0 0 0:00 0 Daroca 1 1 1:18 220 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 La Iglesuela 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 15 9 59:43 21.546 1 1 1:15 0 Laza 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 12 4 46:51 13.596 0 0 0:00 0 Lubia 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 9 7 39:17 9.405 0 0 0:00 0 Pinofranqueado 0 0 0:00 0 27 22 79:43 32.281 0 0 0:00 0 0 0 0:00 0 9 6 30:31 28.991 1 1 2:15 270 Puntagorda 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Tabuyo del Monte 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 49 36 205:16 75.723 0 0 0:00 0 Tineo 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 4 4 20:40 5.000 0 0 0:00 0 Total BRIF-A 1 XXX* 1:18 220 27 XXX* 79:43 32.281 0 XXX* 0:00 0 0 XXX* 0:00 0 100 XXX* 412:02 ##### 2 XXX* 3:30 270 Total BRIF 1 XXX* 1:18 220 34 XXX* 87:25 35.190 0 XXX* 0:00 0 0 XXX* 0:00 0 129 XXX* 479:12 ##### 2 XXX* 3:30 270
- XXX No se puede totalizar el número de incendios atendidos ya que en un mismo incendio pueden haber intervenido medios de distintas bases
CANARIAS CANTABRIA LA RIOJA MURCIA C. VALENCIANA ARAGÓN CASTILLA LA MANCHA CASTILLA Y LEÓN NAVARRA EXTREMADURA I. BALEARS MADRID PORTUGAL ASTURIAS GALICIA ANDALUCÍA PAÍS VASCO CATALUÑA
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 29 Resumen de Actuación de los medios del MAPAMA. Aviones y Helicópteros de Extinción. Año 2017 NÚM. NÚM. MISIONES INCENDIOS F. alarma Con Sin INCENDIO ATENDIDOS Inc. Contr. Retardante Retardante TORREJON (precampaña) CL-215T / CL-415 01/01 a 15/06 2-3 59 37 20 158:40 0:00 9:00 24:35 192:15 15 368 383 TORREJON (campaña) CL-215T / CL-415 16/06 a 30/09 3 - 4 93 80 36 484:34 0:00 7:11 19:35 511:20 7 1.452 1.459 TORREJON (postcampaña) CL-215T / CL-415 01/10 a 31/12 2- 4 94 69 46 263:37 0:00 17:37 24:57 306:11 5 779 784 LABACOLLA CL-215T / CL-415 01/07 a 30/09 2 - 3 125 95 51 245:51 0:00 12:08 6:52 264:51 0 1.004 1.004 ZARAGOZA CL-215T / CL-415 16/06 a 30/09 1 - 2 25 25 13 114:50 0:00 0:00 0:00 114:50 6 231 237 POLLENSA CL-215T / CL-415 01/06 a 30/09 1 8 8 5 36:31 0:00 0:00 0:00 36:31 0 95 95 MALAGA CL-215T / CL-415 16/06 a 30/09 1 - 2 54 44 21 188:40 0:00 14:24 0:54 203:58 0 558 558 LOS LLANOS CL-215T / CL-415 16/06 a 15/08 1 17 17 11 100:35 0:00 0:00 0:00 100:35 0 272 272 MATACAN CL-215T / CL-415 16/06 a 15/10 2 150 138 75 560:06 0:00 6:30 6:44 573:20 0 2.027 2.027 TALAVERA CL-215T / CL-415 01/07 a 30/09 1 26 23 16 106:00 0:00 1:28 2:00 109:28 0 506 506 TOTAL CL-215T/CL-415 9-12 651 536 XXX * 2259:24 0:00 68:18 85:37 2413:19 33 7.292 7.325 VALLADOLID ACO 02/08 a 30/10 1 55 46 41 118:59 0:00 0:22 22:11 141:32 XXX ** XXX ** XXX ** ZARAGOZA ACO 23/07 a 15/10 1 21 8 7 31:30 0:00 0:00 15:50 47:20 XXX ** XXX ** XXX ** TALAVERA ACO 24/07 a 30/10 1 36 23 21 66:16 0:00 0:25 15:34 82:15 XXX ** XXX ** XXX ** MUCHAMIEL ACO 31/07 a 15/10 1 19 6 4 19:45 0:00 0:00 22:27 42:12 XXX ** XXX ** XXX ** TOTAL ACOs 2 131 83 XXX * 236:30 0:00 0:47 76:02 313:19 XXX ** XXX ** XXX ** XINZO DE LIMIA Airtractor 802 01/07 a 30/09 2 148 129 59 172:24 0:00 1:26 12:22 186:12 104 383 487 NOAIN Airtractor 802 01/07 a 30/09 1 28 16 14 22:24 0:00 1:38 8:51 32:53 0 38 38 SON BONET Airtractor 802 01/07 a 30/09 1 30 16 16 15:19 0:00 1:08 10:09 26:36 8 23 31 NIEBLA Airtractor 802 01/07 a 30/09 1 49 42 39 53:52 0:00 0:20 2:23 56:35 124 13 137 AMPURIABRAVA Airtractor 802 01/07 a 30/09 2 34 6 3 11:42 0:00 2:32 21:37 35:51 14 4 18 REUS (Aa) Airtractor 802 FB 01/07 a 30/09 2 66 40 19 87:52 0:00 4:16 17:44 109:52 151 80 231 MANISES (Aa) Airtractor 802 FB 01/07 a 30/09 2 34 18 2 96:36 0:00 0:00 20:07 116:43 21 153 174 ROSINOS (Aa) Airtractor 802 FB 01/07 a 15/10 1 - 2 125 113 57 251:36 0:00 2:54 4:50 259:20 0 785 785 LA GOMERA Airtractor 802 01/07 a 30/09 1 14 1 1 2:22 0:00 0:00 18:53 21:15 0 2 2 AGONCILLO Airtractor 802 01/07 a 30/09 2 49 30 17 42:20 0:00 1:30 13:51 57:41 14 54 68 TOTAL Airtractor 16 577 411 XXX * 756:27 0:00 15:44 130:47 902:58 436 1.535 1.971 MUCHAMIEL Kamov K-32A 11BC 01/02 a 29/06 1-2 35 13 10 36:08 0:00 4:10 18:53 59:11 0 228 228 PALMA DEL RIO Kamov K-32A 11BC 15/02 a 31/05 1-2 26 7 6 32:46 0:00 2:20 21:21 56:27 0 120 120 TABUYO DEL MONTE Kamov K-32A 11BC 01/02 a 01/04 1 20 11 10 20:11 0:00 0:11 11:23 31:45 0 147 147 IBIAS Kamov K-32A 11BC 01/03 a 29/04 1 48 41 39 112:45 0:00 1:58 11:06 125:49 0 694 694 LAZA Kamov K-32A 11BC 01/03 a 29/04 1 48 36 33 87:07 0:00 1:35 10:32 99:14 0 486 486 TOTAL KAMOV invierno 2-5 177 108 XXX * 288:57 0:00 10:14 73:15 372:26 0 1.675 1.675 LA ALMORAIMA Kamov K-32A 11BC 21/06 a 30/10 1 44 28 23 84:00 0:00 1:22 13:09 98:31 0 528 528 VILLARES JADRAQUE Kamov K-32A 11BC 21/06 a 20/10 1 34 20 11 79:15 0:00 1:06 14:21 94:42 0 460 460 LOS RODEOS Kamov K-32A 11BC 01/07 a 30/10 1 20 2 1 5:56 0:00 0:00 32:38 38:34 0 39 39 PLASENCIA DE CÁCERES Kamov K-32A 11BC 20/06 a 19/10 1 47 38 26 157:27 0:00 0:45 11:07 169:19 57 1.076 1.133 HUELMA Kamov K-32A 11BC 21/06 a 20/10 1 44 26 16 116:12 0:00 2:17 22:53 141:22 107 536 643 IBIAS Kamov K-32A 11BC 01/07 a 30/10 1 57 45 34 129:54 0:00 1:13 12:52 143:59 0 730 730 CARAVACA Kamov K-32A 11BC 16/06 a 15/10 1 49 33 24 130:34 0:00 1:41 19:39 151:54 95 725 820 PLASENCIA DEL MONTE Kamov K-32A 11BC 01/07 a 30/10 1 37 18 17 55:35 0:00 5:30 18:05 79:10 0 316 316 TOTAL KAMOV verano 8 332 210 XXX * 758:53 0:00 13:54 144:44 917:31 259 4.410 4.669 TOTAL GENERAL 4-8 1.868 1.348 XXX * 4300:11 0:00 108:57 510:25 4919:33 728 14.912 15.640 XXX * No se puede totalizar el número de incendios atendidos ya que en un mismo incendio pueden haber intervenido medios de distintas bases XXX ** Los aviones de ACO no realizan descargas Total Periodo operativo Núm. AERONAVES NÚM. MISIONE S BASE TIPO HORAS DE VUELO (hh:mm) Número DESCARGAS en incendio Reconoc. Otras Incendio Total
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 30 Resumen de Actuación de los medios del MAPAMA. Helicópteros de Transporte. Año 2017 NÚM. NÚM. NÚM. NÚM. MISIONES INCENDIOS Falsa Alarma BRIGADAS PERSONAS Con Sin INCENDIO ATENDIDOS Inc. Controlado TRANSPOR. TRANSPOR. Espuma Espuma PINOFRANQUEADO Bell 412 01/02 a 01/04 1 24 15 13 42:53 0:00 1:20 7:50 52:03 6 54 0 395 395 TABUYO DEL MONTE Bell 412 01/02 a 01/04 1 23 12 11 22:32 0:00 0:17 14:18 37:07 10 85 0 210 210 TINEO Bell 412 01/03 a 29/04 1 61 48 44 119:50 0:00 0:54 13:15 133:59 48 421 0 760 760 LAZA Sokol PZL 01/03 a 29/04 1 41 30 26 83:50 0:00 1:50 10:33 96:13 30 270 0 506 506 RUENTE Bell 412 01/03 a 29/04 1 66 54 51 121:20 0:00 0:45 13:39 135:44 52 467 0 839 839 TOTAL BRIF-i 5 215 159 XXX * 390:25 0:00 5:06 59:35 455:06 146 1.297 0 2.710 2.710 DAROCA Sokol PZL 15/06 a 14/10 2 68 33 13 130:57 0:00 0:14 37:50 169:01 33 295 0 414 414 CUENCA Sokol PZL 15/06 a 14/10 2 110 50 19 165:57 0:00 2:04 41:24 209:25 46 394 0 882 882 LA IGLESUELA Sokol PZL 15/06 a 14/10 2 79 28 12 130:29 0:00 6:42 36:07 173:18 29 248 0 866 866 PINOFRANQUEADO Sokol PZL 15/06 a 22/10 2 101 62 26 205:46 0:00 3:21 34:47 243:54 57 493 0 1.331 1.331 LAZA Sokol PZL 15/06 a 30/10 2 173 144 67 451:41 0:00 5:25 22:55 480:01 164 1.394 0 3.640 3.640 PUERTO EL PICO Sokol PZL 15/06 a 14/10 1 56 23 20 64:54 0:00 6:24 11:08 82:26 24 213 0 419 419 TINEO Sokol PZL 01/07 a 30/10 2 105 73 28 252:49 0:00 6:55 30:30 290:14 82 667 0 1.336 1.336 LUBIA Sokol PZL 01/07 a 30/10 2 63 26 9 123:44 0:00 1:44 42:31 167:59 25 211 0 596 596 TABUYO DEL MONTE Sokol PZL 15/06 a 30/10 2 147 110 48 414:39 0:00 2:12 28:34 445:25 123 1.028 0 2.540 2.540 PUNTAGORDA Sokol PZL 15/06 a 14/10 2 81 4 2 9:38 0:00 0:00 106:29 116:07 4 35 0 27 27 TOTAL BRIF-A y B 19 983 553 XXX * 1950:34 0:00 35:01 392:15 2377:50 587 4.978 0 12.051 12.051 TOTAL GENERAL 5 1.198 712 XXX * 2340:59 0:00 40:07 451:50 2832:56 733 6.275 0 14.761 14.761 XXX * No se puede totalizar el número de incendios atendidos ya que en un mismo incendio pueden haber intervenido medios de distintas bases Reconoc. Otras Total Total BASE TIPO HORAS DE VUELO (hh:mm) DESCARGAS Periodo operativo Num. AERONAVES NUM. MISIONES Incendio
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 31 Resumen de Actuación de los medios del MAPAMA por comunidad autónoma I. Aviones y Helicópteros de extinción. Año 2017 Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas DescargasNum. Int.Num. Inc. Horas Descargas Num. Int.Num. Inc. Horas Descargas TORREJON (precampaña) 0 0 0:00 0 0 0 0:00 0 5 4 15:25 47 0 0 0:00 0 2 2 8:50 13 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 TORREJON (campaña) 0 0 0:00 0 0 0 0:00 0 6 5 20:25 50 10 3 59:00 231 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 9:00 21 0 0 0:00 0 TORREJON (postcampaña) 0 0 0:00 0 0 0 0:00 0 38 32 123:37 526 2 1 9:30 3 0 0 0:00 0 1 1 2:00 4 4 1 14:20 25 0 0 0:00 0 1 1 7:20 12 9 1 50:20 38 LABACOLLA 0 0 0:00 0 0 0 0:00 0 80 43 192:11 776 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 ZARAGOZA 0 0 0:00 0 6 2 29:45 72 0 0 0:00 0 1 1 4:10 2 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 2 1 11:30 20 9 5 27:45 53 POLLENSA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 3 1 18:22 37 0 0 0:00 0 MALAGA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 36 16 137:00 467 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 4:20 10 0 0 0:00 0 0 0 0:00 0 LOS LLANOS 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 6 5 24:35 77 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 2 2 6:50 18 3 2 20:30 51 0 0 0:00 0 MATACAN 0 0 0:00 0 0 0 0:00 0 35 25 96:29 316 9 6 26:11 93 0 0 0:00 0 0 0 0:00 0 1 1 4:30 8 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 TALAVERA 0 0 0:00 0 0 0 0:00 0 1 1 2:02 2 4 3 16:44 89 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 TOTAL CL-215T/CL-415 0 XXX * 0:00 0 6 XXX * 29:45 72 165 XXX * 450:09 1717 68 XXX * 277:10 962 2 XXX * 8:50 13 1 XXX * 2:00 4 5 XXX * 18:50 33 3 XXX * 11:10 28 10 XXX * 66:42 141 18 XXX * 78:05 91 VALLADOLID 0 0 0:00 XXX ** 0 0 0:00 XXX ** 19 18 48:36 XXX ** 0 0 0:00 XXX ** 1 1 0:29 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** ZARAGOZA 0 0 0:00 XXX ** 1 1 4:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 1 1 0:55 XXX ** 2 1 14:20 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 2 2 6:25 XXX ** TALAVERA 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 9 8 21:52 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** MUCHAMIEL 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 2 1 7:20 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 1 1 1:30 XXX ** 0 0 0:00 XXX ** TOTAL ACOs 0 XXX * 0:00 XXX ** 1 XXX * 4:00 XXX ** 19 XXX * 48:36 XXX ** 11 XXX * 29:12 XXX ** 1 XXX * 0:29 XXX ** 1 XXX * 0:55 XXX ** 2 XXX * 14:20 XXX ** 0 XXX * 0:00 XXX ** 1 XXX * 1:30 XXX ** 2 XXX * 6:25 XXX ** XINZO DE LIMIA 0 0 0:00 0 0 0 0:00 0 125 57 168:48 477 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 NOAIN 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 1:04 1 0 0 0:00 0 0 0 0:00 0 1 1 1:39 2 SON BONET 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 NIEBLA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 42 39 53:52 137 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 AMPURIABRAVA 0 0 0:00 0 6 3 11:42 18 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 REUS (Aa) 0 0 0:00 0 34 16 68:08 175 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 6 3 19:44 56 MANISES (Aa) 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 4 1 13:03 24 0 0 0:00 0 ROSINOS (Aa) 0 0 0:00 0 0 0 0:00 0 25 13 50:30 144 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 LA GOMERA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 AGONCILLO 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 13 9 12:22 26 0 0 0:00 0 0 0 0:00 0 2 1 4:22 2 TOTAL Airtractor 0 XXX * 0:00 0 40 XXX * 79:50 193 150 XXX * 219:18 621 42 XXX * 53:52 137 0 XXX * 0:00 0 0 XXX * 0:00 0 14 XXX * 13:26 27 0 XXX * 0:00 0 4 XXX * 13:03 24 9 XXX * 25:45 60 MUCHAMIEL 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 11 9 31:15 211 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 PALMA DEL RIO 0 0 0:00 0 0 0 0:00 0 2 2 9:17 39 1 1 2:00 1 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 TABUYO DEL MONTE 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 IBIAS 0 0 0:00 0 0 0 0:00 0 8 8 27:28 131 0 0 0:00 0 31 29 80:12 538 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 LAZA 0 0 0 0 0 0:00 0 25 25 48:53 301 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 TOTAL KAMOV invierno 0 XXX * 0:00 0 0 XXX * 0:00 0 35 XXX * 85:38 471 1 XXX * 2:00 1 42 XXX * 111:27 749 0 XXX * 0:00 0 0 XXX * 0:00 0 0 XXX * 0:00 0 0 XXX * 0:00 0 0 XXX * 0:00 0 LA ALMORAIMA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 26 22 69:20 423 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 VILLARES JADRAQUE 0 0 0:00 0 0 0 0:00 0 1 1 2:02 20 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 2 1 9:12 30 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 LOS RODEOS 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 PLASENCIA DE CÁCERES 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 2 1 12:46 83 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 HUELMA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 18 13 73:08 425 0 0 0:00 0 1 1 3:00 5 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 IBIAS 0 0 0:00 0 0 0 0:00 0 17 15 39:28 193 0 0 0:00 0 18 12 62:11 382 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 CARAVACA 0 0 0:00 0 0 0 0:00 0 9 7 32:14 160 2 1 8:35 58 2 2 4:25 31 0 0 0:00 0 0 0 0:00 0 6 6 11:41 109 0 0 0:00 0 0 0 0:00 0 PLASENCIA DEL MONTE 0 0 0:00 0 1 1 7:01 29 2 2 7:00 45 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 2 1 11:45 30 0 0 0:00 0 0 0 0:00 0 13 13 29:49 212 TOTAL KAMOV verano 0 XXX * 0:00 0 1 XXX * 7:01 29 29 XXX * 80:44 418 48 XXX * 163:49 989 20 XXX * 66:36 413 1 XXX * 3:00 5 4 XXX * 20:57 60 6 XXX * 11:41 109 0 XXX * 0:00 0 13 XXX * 29:49 212 TOTAL 0 XXX * 0:00 0 48 XXX * 120:36 294 398 XXX * 884:25 3.227 170 XXX * 526:03 2.089 65 XXX * 187:22 1.175 3 XXX * 5:55 9 25 XXX * 67:33 120 9 XXX * 22:51 137 15 XXX * 81:15 165 42 XXX * 140:04 363 PAÍS VASCO LA RIOJA ANDALUCÍA ASTURIAS CANTABRIA ARAGÓN C.VALENCIANA MURCIA BASE CATALUÑA GALICIA
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 32 Resumen de Actuación de los medios del MAPAMA por comunidad autónoma II. Aviones y Helicópteros de extinción. Año 2017 Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas DescargasNum. Int.Num. Inc. Horas Descargas Num. Int.Num. Inc. Horas Descargas TORREJON (precampaña) 1 1 1:45 3 0 0 0:00 0 0 0 0:00 0 12 4 68:05 191 0 0 0:00 0 2 2 4:05 13 15 7 60:30 116 0 0 0:00 0 0 0 0:00 0 37 20 158:40 383 TORREJON (campaña) 12 1 78:05 149 0 0 0:00 0 0 0 0:00 0 1 1 4:20 29 0 0 0:00 0 0 0 0:00 0 12 10 58:25 159 0 0 0:00 0 38 15 255:19 820 80 36 484:34 1459 TORREJON (postcampaña) 1 1 1:45 3 0 0 0:00 0 0 0 0:00 0 2 1 14:00 50 0 0 0:00 0 0 0 0:00 0 11 7 40:45 123 0 0 0:00 0 0 0 0:00 0 69 46 263:37 784 LABACOLLA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 12 5 41:40 181 0 0 0:00 0 3 3 12:00 47 95 51 245:51 1004 ZARAGOZA 4 1 31:15 64 0 0 0:00 0 1 1 3:00 8 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 2 2 7:25 18 0 0 0:00 0 0 0 0:00 0 25 13 114:50 237 POLLENSA 2 1 7:23 13 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 3 3 10:46 45 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 8 5 36:31 95 MALAGA 4 1 26:40 46 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 3 3 20:40 35 44 21 188:40 558 LOS LLANOS 5 1 39:40 95 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 9:00 31 17 11 100:35 272 MATACAN 2 1 8:25 14 0 0 0:00 0 0 0 0:00 0 7 4 24:52 118 0 0 0:00 0 0 0 0:00 0 51 22 201:34 713 0 0 0:00 0 33 16 198:05 765 138 75 560:06 2027 TALAVERA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 8 8 21:34 141 0 0 0:00 0 0 0 0:00 0 3 2 21:42 76 0 0 0:00 0 7 2 43:58 198 23 16 106:00 506 TOTAL CL-215T/CL-415 31 XXX * 194:58 387 0 XXX * 0:00 0 1 XXX * 3:00 8 30 XXX * 132:51 529 3 XXX * 10:46 45 2 XXX * 4:05 13 106 XXX * 432:01 1386 0 XXX * 0:00 0 85 XXX * 539:02 1896 536 XXX * 2259:24 7325 VALLADOLID 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 26 22 69:54 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 46 41 118:59 XXX ** ZARAGOZA 2 2 5:50 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 8 7 31:30 TALAVERA 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 8 8 25:16 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 4 4 13:21 XXX ** 0 0 0:00 XXX ** 2 1 5:47 XXX ** 23 21 66:16 MUCHAMIEL 3 2 10:55 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 6 4 19:45 TOTAL ACOs 5 XXX * 16:45 XXX ** 0 XXX * 0:00 XXX ** 0 XXX * 0:00 XXX ** 8 XXX * 25:16 XXX ** 0 XXX * 0:00 XXX ** 0 XXX * 0:00 XXX ** 30 XXX * 83:15 XXX ** 0 XXX * 0:00 XXX ** 2 XXX * 5:47 XXX ** 83 XXX * 236:30 0 XINZO DE LIMIA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 4 2 3:36 10 129 59 172:24 487 NOAIN 0 0 0:00 0 0 0 0:00 0 14 12 19:41 35 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 16 14 22:24 38 SON BONET 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 16 16 15:19 31 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 16 16 15:19 31 NIEBLA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 42 39 53:52 137 AMPURIABRAVA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 6 3 11:42 18 REUS (Aa) 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 40 19 87:52 231 MANISES (Aa) 14 1 83:33 150 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 18 2 96:36 174 ROSINOS (Aa) 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 83 41 194:04 629 0 0 0:00 0 5 3 7:02 12 113 57 251:36 785 LA GOMERA 0 0 0:00 0 1 1 2:22 2 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 2:22 2 AGONCILLO 0 0 0:00 0 0 0 0:00 0 11 5 17:41 30 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 4 2 7:55 10 0 0 0:00 0 0 0 0:00 0 30 17 42:20 68 TOTAL Airtractor 14 XXX * 83:33 150 1 XXX * 2:22 2 25 XXX * 37:22 65 0 XXX * 0:00 0 16 XXX * 15:19 31 0 XXX * 0:00 0 87 XXX * 201:59 639 0 XXX * 0:00 0 9 XXX * 10:38 22 411 XXX * 756:27 1971 MUCHAMIEL 2 1 4:53 17 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 13 10 36:08 228 PALMA DEL RIO 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 2 1 13:37 49 0 0 0:00 0 0 0 0:00 0 2 2 7:52 31 0 0 0:00 0 0 0 0:00 0 7 6 32:46 120 TABUYO DEL MONTE 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 11 10 20:11 147 0 0 0:00 0 0 0 0:00 0 11 10 20:11 147 IBIAS 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 2 2 5:05 25 0 0 0:00 0 0 0 0:00 0 41 39 112:45 694 LAZA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 11 8 38:14 185 0 0 0:00 0 0 0 0:00 0 36 33 87:07 486 TOTAL KAMOV invierno 2 XXX * 4:53 17 0 XXX * 0:00 0 0 XXX * 0:00 0 2 XXX * 13:37 49 0 XXX * 0:00 0 0 XXX * 0:00 0 26 XXX * 71:22 388 0 XXX * 0:00 0 0 XXX * 0:00 0 108 XXX * 288:57 1675 LA ALMORAIMA 2 1 14:40 105 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 28 23 84:00 528 VILLARES JADRAQUE 7 5 28:40 237 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 10 4 39:21 173 0 0 0:00 0 0 0 0:00 0 20 11 79:15 460 LOS RODEOS 0 0 0:00 0 2 1 5:56 39 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 2 1 5:56 39 PLASENCIA DE CÁCERES 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 12 11 42:52 379 0 0 0:00 0 0 0 0:00 0 23 13 97:04 652 0 0 0:00 0 1 1 4:45 19 38 26 157:27 1133 HUELMA 7 2 40:04 213 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 26 16 116:12 643 IBIAS 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 10 7 28:15 155 0 0 0:00 0 0 0 0:00 0 45 34 129:54 730 CARAVACA 8 2 48:54 317 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 6 6 24:45 145 0 0 0:00 0 0 0 0:00 0 33 24 130:34 820 PLASENCIA DEL MONTE 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 18 17 55:35 316 TOTAL KAMOV verano 24 XXX * 132:18 872 2 XXX * 5:56 39 0 XXX * 0:00 0 12 XXX * 42:52 379 0 XXX * 0:00 0 0 XXX * 0:00 0 49 XXX * 189:25 1125 0 XXX * 0:00 0 1 XXX * 4:45 19 210 XXX * 758:53 4669 TOTAL 76 XXX * 432:27 1.426 3 XXX * 8:18 41 26 XXX * 40:22 73 52 XXX * 214:36 957 19 XXX * 26:05 76 2 XXX * 4:05 13 298 XXX * 978:02 3.538 0 XXX * 0:00 0 97 XXX * 560:12 1.937 1.348 XXX * 4300:11 15.640 XXX** Los ACOS no realizan descargas
- XXX No se puede totalizar el número de incendios atendidos ya que en un mismo incendio pueden haber intervenido medios de distintas bases
CASTILLA LA MANCHA BASE NAVARRA EXTREMADURA CANARIAS ILLES BALEARS MADRID CEUTA CASTILLA Y LEÓN TOTAL NACIONAL PORTUGAL
INCENDIOS FORESTALES 01/01/2017 - 31/12/2017 AVANCE INFORMATIVO 33 Resumen de Actuación de los medios del MAPAMA por comunidad autónoma. Helicópteros de transporte. Año 2017 Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas PINOFRANQUEADO 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 TABUYO DEL MONTE 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 TINEO 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 47 43 412 117:42 752 0 0 0 0:00 0 LAZA 0 0 0 0:00 0 0 0 0 0:00 0 19 19 171 38:46 271 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 RUENTE 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 14 12 125 38:44 225 37 36 315 74:56 572 TOTAL BRIF-i 0 XXX * 0 0:00 0 0 XXX * 0 0:00 0 19 XXX * 171 38:46 271 0 XXX * 0 0:00 0 61 XXX * 537 156:26 977 37 XXX * 315 74:56 572 DAROCA 0 0 0 0:00 0 2 1 19 14:06 66 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 CUENCA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 LA IGLESUELA 0 0 0 0:00 0 0 0 0 0:00 0 2 1 18 10:47 21 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 PINOFRANQUEADO 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 LAZA 0 0 0 0:00 0 0 0 0 0:00 0 128 62 1.210 376:27 2.880 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 PUERTO EL PICO 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 TINEO 0 0 0 0:00 0 0 0 0 0:00 0 4 2 28 15:30 50 0 0 0 0:00 0 59 22 572 192:08 979 0 0 0 0:00 0 LUBIA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 TABUYO DEL MONTE 0 0 0 0:00 0 0 0 0 0:00 0 23 12 230 81:52 391 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 PUNTAGORDA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 TOTAL BRIF-A y B 0 XXX * 0 0:00 0 2 XXX * 19 14:06 66 157 XXX * 1.486 484:36 3.342 0 XXX * 0 0:00 0 59 XXX * 572 192:08 979 0 XXX * 0 0:00 0 TOTAL GENERAL 0 XXX * 0 0:00 0 2 XXX * 19 14:06 66 176 XXX * 1.657 523:22 3.613 0 XXX * 0 0:00 0 120 XXX * 1.109 348:34 1.956 37 XXX * 315 74:56 572 Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas PINOFRANQUEADO 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 TABUYO DEL MONTE 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 TINEO 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 LAZA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 RUENTE 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 TOTAL BRIF-i 0 XXX * 0 0:00 0 0 XXX * 0 0:00 0 0 XXX * 0 0:00 0 0 XXX * 0 0:00 0 0 XXX * 0 0:00 0 0 XXX * 0 0:00 0 DAROCA 4 1 36 25:53 63 0 0 0 0:00 0 4 1 35 22:48 70 17 8 152 43:20 163 4 1 35 18:26 30 0 0 0 0:00 0 CUENCA 0 0 0 0:00 0 2 1 18 12:24 64 4 1 35 28:02 156 0 0 0 0 40 15 309 112:16 632 0 0 0 0:00 0 LA IGLESUELA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 2 1 17 3:34 42 0 0 0 0:00 0 PINOFRANQUEADO 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0:00 0 0 0 0 0:00 0 LAZA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 PUERTO EL PICO 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 1 1 9 2:34 15 0 0 0 0:00 0 TINEO 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 LUBIA 2 1 17 9:29 27 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 6 1 32 33:00 210 0 0 0 0:00 0 TABUYO DEL MONTE 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 PUNTAGORDA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 4 2 35 9:38 27 TOTAL BRIF-A y B 6 XXX * 53 35:22 90 2 XXX * 18 12:24 64 8 XXX * 70 50:50 226 17 XXX * 152 43:20 163 53 XXX * 402 169:50 929 4 XXX * 35 9:38 27 TOTAL GENERAL 6 XXX * 53 35:22 90 2 XXX * 18 12:24 64 8 XXX * 70 50:50 226 17 XXX * 152 43:20 163 53 XXX * 402 169:50 929 4 XXX * 35 9:38 27 Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas PINOFRANQUEADO 0 0 0 0:00 0 12 10 27 37:07 350 0 0 0 0:00 0 0 0 0 0:00 0 3 3 27 5:46 45 0 0 0 0:00 0 TABUYO DEL MONTE 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 12 11 85 22:32 210 0 0 0 0:00 0 TINEO 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 1 1 9 2:08 8 0 0 0 0:00 0 LAZA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 11 7 99 45:04 235 0 0 0 0:00 0 RUENTE 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 3 3 27 7:40 42 0 0 0 0:00 0 TOTAL BRIF-i 0 XXX * 0 0:00 0 12 XXX * 27 37:07 350 0 XXX * 0 0:00 0 0 XXX * 0 0:00 0 30 XXX * 247 83:10 540 0 XXX * 0 0:00 0 DAROCA 2 1 18 6:24 22 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 CUENCA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 4 2 32 13:15 30 0 0 0 0:00 0 LA IGLESUELA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 22 9 188 110:53 796 2 1 25 5:15 7 PINOFRANQUEADO 0 0 0 0:00 0 38 18 287 124:07 973 0 0 0 0:00 0 0 0 0 0:00 22 7 189 72:50 358 2 1 17 8:49 0 LAZA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 16 5 184 75:14 760 0 0 0 0:00 0 PUERTO EL PICO 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 22 19 204 62:20 404 0 0 0 0:00 0 TINEO 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 10 4 67 45:11 307 0 0 0 0:00 0 LUBIA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 18 7 162 81:15 359 0 0 0 0:00 0 TABUYO DEL MONTE 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 87 36 798 332:47 2.149 0 0 0 0:00 0 PUNTAGORDA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 TOTAL BRIF-A y B 2 XXX * 18 6:24 22 38 XXX * 287 124:07 973 0 XXX * 0 0:00 0 0 XXX * 0 0:00 0 201 XXX * 1.824 793:45 5.163 4 XXX * 42 14:04 7 TOTAL GENERAL 2 XXX * 18 6:24 22 50 XXX * 314 161:14 1.323 0 XXX * 0 0:00 0 0 XXX * 0 0:00 0 231 XXX * 2.071 876:55 5.703 4 XXX * 42 14:04 7 XXX * No se puede totalizar el número de incendios atendidos ya que en un mismo incendio pueden haber intervenido medios de distintas bases BASE PAÍS VASCO CATALUÑA C. VALENCIANA ARAGÓN CASTILLA LA MANCHA BASE CANARIAS GALICIA ANDALUCÍA ASTURIAS CANTABRIA NAVARRA EXTREMADURA LA RIOJA MURCIA PORTUGAL ILLES BALEARS MADRID CASTILLA Y LEÓN BASE
FD06127 | 2018_西班牙_MITECO_森林火灾年报_火灾报告.pdf
分类:06_境外及港澳台调查报告 | 年份:2018 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
Los Incendios Forestales en España EPRIF La Palma ejecutando una quema prescrita bajo arbolado con la ayuda de la BLP de Puntagorda, en el Municipio de Puntagorda 19/03/2018 (Isla de La Palma/Santa Cruz de Tenerife) 1 enero – 31 diciembre 2018 Avance Informativo
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 1 Índice
- Antecedentes ................................................................................................ 3
- 1 Objeto del informe ............................................................................................. 3
- 2 Marco Legal ....................................................................................................... 3
- Daños producidos en 2018 por los incendios forestales ......................... 4
- 1 Número de incendios y superficies afectadas ................................................ 4
- 2 Grandes Incendios Forestales (GIF) ................................................................ 8
- El programa de Ministerio de Agricultura, Pesca y Alimentación para la
defensa contra los incendios forestales ........................................................ 8 3.1 Actuaciones de coordinación y planificación ................................................. 8 3.1.1 Comisión Paritaria, Ministerio de Defensa – Ministerio de Agricultura, Pesca y Alimentación .......................................................................................................................... 9 3.1.2 Comité de Lucha contra Incendios Forestales (CLIF).................................................. 9 3.1.3 Centro de Coordinación de la Información Nacional sobre Incendios Forestales (CCINIF) .............................................................................................................................. 10 3.2 Actuaciones de prevención ............................................................................ 11 3.2.1 Formación en Defensa contra incendios forestales ................................................... 11 3.2.2 Equipos de Prevención Integral (EPRIF) ................................................................... 11 3.2.3 Brigadas de Labores Preventivas (BLP) .................................................................... 12 3.3 Actuaciones de extinción ............................................................................... 12 3.3.1 Medios humanos: Brigadas de Refuerzo contra incendios forestales (BRIF) ........... 12 3.3.2 Medios aéreos: aviones anfibios, helicópteros bombarderos, helicópteros de transporte ............................................................................................................................ 14 3.4. Actividad en el ámbito internacional............................................................. 17
- Anexos ........................................................................................................ 19
- 1 Avance estadístico Incendios Forestales (1 enero al 31 de diciembre) ...... 19
- 2. Distribución de los medios del MAPA 2018.................................................. 21
- 3. Actividad de los medios del MAPA 2018 ...................................................... 25
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 2 Este informe ha sido elaborado por del Área de Defensa contra Incendios Forestales Ministerio de Agricultura, Pesca y Alimentación Madrid, Marzo de 2019
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 3
- Antecedentes
- 1 Objeto del informe
Este informe constituye el avance estadístico de incendios forestales del año 2018. Recoge las actuaciones realizadas por el Ministerio de Agricultura, Pesca y Alimentación (MAPA) en la defensa contra incendios forestales, así como las condiciones de peligro y la ocurrencia de incendios registrada durante el periodo comprendido desde el 1 de enero al 31 de diciembre del año 2018. El objeto de este documento es proporcionar la información más actualizada a los miembros del Comité de Lucha contra los Incendios Forestales (CLIF), la Comisión Interministerial de Coordinación para la Prevención y Lucha contra los Incendios Forestales, los servicios administrativos autonómicos competentes y el público en general. Está disponible para su consulta en el siguiente enlace ubicado en la página Web del MAPA, junto con las memorias estadísticas de los incendios forestales sucedidos en España desde 1968. https://www.mapa.gob.es/es/desarrollo-rural/estadisticas/Incendios_default.aspx
- 2 Marco Legal
El Ministerio de Agricultura, Pesca y Alimentación desarrolla sus actuaciones en la defensa y lucha contra los incendios forestales, bajo el marco legal establecido por las siguientes disposiciones: Ley 43/2003, de 21 de noviembre, de Montes. Real Decreto-Ley 11/2005, de 22 de julio, por el que se aprueban medidas urgentes en materia de incendios forestales. Acuerdo del Consejo de Ministros de 7 de octubre de 2005 por el que se crea la Unidad Militar de Emergencias. Ley 10/2006, de 28 de abril, por la que se modifica la Ley 43/2003, de 21 de noviembre, de Montes. Real Decreto 1424/2008, de 14 de agosto, por el que se determinan la composición y las funciones de la Comisión Estatal para el Patrimonio Natural y la Biodiversidad, se dictan las normas que regulan su funcionamiento y se establecen los comités especializados adscritos a la misma. Ley 3/2010, de 10 de marzo, por la que se aprueban medidas urgentes para paliar los daños producidos por los incendios forestales y otras catástrofes naturales ocurridos en varias comunidades autónomas. Real Decreto 1097/2011, de 22 de julio, por el que se aprueba el Protocolo de Intervención de la Unidad Militar de Emergencias. Real Decreto 904/2018, de 21 de julio, por el que se desarrolla la estructura orgánica básica del Ministerio de Agricultura, Pesca y Alimentación.
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 4 Real Decreto 893/2013, de 15 de noviembre, por el que se aprueba la Directriz básica de planificación de protección civil de emergencia por incendios forestales. Resolución de 31 de octubre de 2014, de la Subsecretaría, por la que se publica el Acuerdo del Consejo de Ministros de 24 de octubre de 2014, por el que se aprueba el Plan Estatal de Protección Civil para Emergencias por Incendios Forestales. Ley 21/2015, de 20 de julio, por la que se modifica la Ley 43/2003, de 21 de noviembre, de Montes.
- Daños producidos en 2018 por los incendios forestales
- 1 Número de incendios y superficies afectadas
La estadística provisional del periodo comprendido entre el 1 de enero y el 31 de diciembre del año 2018, adjunta como anexo a este informe, se elabora con la información que envían las comunidades autónomas con periodicidad semanal durante la campaña de verano, y mensual para el resto del año. De acuerdo con estos datos, el número total de siniestros ha descendido un 43,19% con respecto a la media del último decenio, con un descenso del 37,75% en el número de conatos (incendios de superficie ≤1 ha) y del 53,67% en el de incendios (incendios de superficie > 1ha), respectivamente. Ha sido el año con menor número de siniestros del último decenio. MEDIA DEL DECENIO 2008-2017 (01/01/-31/12) AÑO 2018 (01/01-31/12) Nº CONATOS ( ha) 8.280 5.154 Nº INCENDIOS (≥1 ha) 4.293 1.989 TOTAL SINIESTROS 12.573 7.143
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 5 En cuanto a las superficies afectadas se ha producido un descenso con respecto a la media del último decenio, siendo de un 66,16% en la superficie arbolada y de un 75,19% en superficie forestal. El 2018 ha sido el año con menor superficie afectada en todo el decenio y también en toda la serie histórica disponible, desde que en 1968 comenzó a elaborarse la Estadística General de Incendios Forestales. MEDIA DEL DECENIO 2008-2017 (01/01/-31/12) AÑO 2018 (01/01-31/12) S. ARBOLADA (ha) 30.702,16 4.739,03 S. FORESTAL (ha) 101.411,53 25.162,44
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 6 Dada la heterogeneidad del territorio nacional en cuanto a meteorología, topografía, vegetación y factores socioeconómicos existentes, tradicionalmente se aborda el análisis de la siniestralidad de incendios forestales de forma regionalizada de acuerdo a cuatro zonas consideradas homogéneas. Las zonas definidas son las siguientes: NOROESTE: Comprende las comunidades autónomas de Galicia, Asturias, Cantabria y las provincias de León y Zamora. MEDITERRÁNEO: Comprende las comunidades autónomas costeras con el mar Mediterráneo, incluyendo sus provincias interiores. CANARIAS: Incluye todo el archipiélago canario. COMUNIDADES INTERIORES1: Comprende las provincias del resto de comunidades autónomas no costeras, excepto León y Zamora, así como el País Vasco. Teniendo en cuenta la zonificación descrita, se aprecia que la región Noroeste es la que sufre un mayor número de siniestros, con un 43,27% del total anual. Le sigue la región de las Comunidades Interiores, con el 34,45%, la región Mediterránea y finalmente Canarias. 1 Tradicionalmente el País Vasco se ha incluido dentro de la región Noroeste, sin embargo dada la escasa coincidencia de su casuística de incendios con el resto de territorios de esta región, en cuando a número, superficie y causalidad, en adelante se incluirá dentro de las denominadas Comunidades interiores.
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 7 En relación a la superficie forestal total afectada, la región Noroeste representa el 42,61% del total, seguida por la región del Mediterráneo, las Comunidades Interiores y, con valores muy inferiores, Canarias. Atendiendo a la superficie forestal arbolada, los mayores valores de afección se produjeron en las regiones del Noroeste y del Mediterráneo, cercanos al 35%, seguidos por los valores de las Comunidades Interiores y Canarias.
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 8
- 2 Grandes Incendios Forestales (GIF)
Según la estadística provisional proporcionada por los servicios competentes de las administraciones autonómicas, durante 2018 tuvieron lugar 3 Grandes Incendios Forestales (GIF), categoría que incluye aquellos incendios que superan las 500 hectáreas forestales afectadas. El primer GIF tuvo lugar en mayo, los dos siguientes durante la campaña de verano. En total los GIF registrados supusieron, según se recoge en la tabla adjunta, un 20,97% de la superficie total afectada siendo sólo el 0,04% del total de siniestros ocurridos en el año. Provincia Municipio Fecha (día/mes) Superficie Forestal (ha) León Santa Columba de Curueño 12/05 645,00 Huelva Nerva 02/08 1.484,94 Valencia Llutxtent 06/08 3.146,69 SUPERFICIE FORESTAL AFECTADA 5.276,43 Los dos GIF que se produjeron durante la campaña de verano supusieron el 87,78% de la superficie total afectada en la región del Mediterráneo. La región geográfica Mediterránea, donde tuvieron lugar dos de los tres GIF, fue el escenario del 87,78% de la superficie afectada por los mismos.
- El programa de Ministerio de Agricultura, Pesca y Alimentación
para la defensa contra los incendios forestales
- 1 Actuaciones de coordinación y planificación
Comprende las acciones de coordinación técnica realizadas en 2018 por este departamento junto con las diferentes administraciones públicas competentes en la defensa y lucha contra los incendios forestales.
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 9 3.1.1 Comisión Paritaria, Ministerio de Defensa – Ministerio de Agricultura, Pesca y Alimentación Durante el año 2018 se celebraron dos reuniones de la Comisión Paritaria encargada de coordinar las necesidades de operatividad, mantenimiento y disponibilidad de los aviones Canadair operados por el 43 Grupo de las Fuerzas Aéreas del Ejército del Aire. Se celebraron sendas reuniones, el 6 de junio y 13 de diciembre respectivamente, para acordar el despliegue de los aviones, así como analizar aspectos de la campaña 2018. 3.1.2 Comité de Lucha contra Incendios Forestales (CLIF) Es un Comité técnico para la coordinación entre las administraciones competentes en la defensa contra los incendios forestales, presidido por el Subdirector General de Política Forestal de la Dirección General de Desarrollo Rural, Innovación y Política Forestal (MAPA) y se reúne dos veces al año, antes y después de la campaña estival. El 6 de junio de 2018 tuvo lugar la reunión de pre-campaña del CLIF. En dicha reunión se abordaron los siguientes asuntos: o Intervención de la Comisión de Investigación de Accidentes e Incidentes de Aviación Civil (CIAIAC). Revisión de recomendaciones por accidentes e incidentes en incendios forestales. o Avances de los Grupos de Trabajo del CLIF o GT coordinación aérea o GT prevención o Aspectos relativos a la Campaña 2018, en cuanto a despliegue y protocolos. o Intervención del Ministerio de Defensa: 43 Grupo y Unidad Militar de Emergencias (UME). o Intervención de la Agencia Estatal de Seguridad Aérea (AESA) para exponer los avances relativas a la formación de los pilotos de helicópteros de extinción de incendios. o Cursos y Jornadas a celebrar por el MAPA durante 2018. Asimismo el día 13 de diciembre de 2018 tuvo lugar la reunión post-campaña del CLIF, en la que se trataron los siguientes asuntos: o Información de Agencia Estatal de Seguridad Aérea (AESA) en relación con la bases de extinción de incendios forestales. o Mecanismo Europeo de Protección Civil (MEPC) y participación de España mediante el Módulo de Evaluación y Asesoramiento en Incendios Forestales. o Presentación del Programa Estatal de preparación en incendios forestales o Avances alcanzados por los Grupos de Trabajo del CLIF:
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 10 o GT información o GT prevención o GT SMI y acreditación formación o GT coordinación aérea o Sistema Hermes de seguimiento de posiciones de medios aéreos o Resultados de la Campaña de incendios 2018 3.1.3 Centro de Coordinación de la Información Nacional sobre Incendios Forestales (CCINIF) De acuerdo con el Real Decreto-Ley 11/2005, el CCINIF las funciones principales del CCINIF son canalizar de forma centralizada y poner a disposición del conjunto de las administraciones públicas competentes, en tiempo real, toda la información de que dispongan las distintas administraciones públicas en relación con la evolución del riesgo de incendios forestales, los medios materiales, técnicos y personales disponibles en cada momento y los incendios forestales, una vez que se produzcan. La información de los siniestros en los que intervienen medios estatales del MAPA se actualiza tres veces al día en la página web del Ministerio. Diariamente se publican el mapa de riesgo para los siguientes dos días y las intervenciones de los medios del Ministerio en los incendios forestales sucedidos el día anterior. Ejemplo del mapa de riesgo publicado diariamente por el CCINIF
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 11 Dicha información puede consultarse en el siguiente enlace: https://www.mapa.gob.es/es/desarrollo-rural/temas/politica-forestal/incendios- forestales/extincion/default.aspx
- 2 Actuaciones de prevención
- 2.1 Formación en Defensa contra incendios forestales
Durante el año 2018 el MAPA realizó los siguientes cursos y jornadas de formación
destinados a profesionales que trabajan en la defensa contra incendios forestales:
Jornada El fuego en los espacios naturales protegidos, entre la amenaza y la
conservación, celebrada en Madrid el 4 de abril de 2018
Jornada Los actores del medio rural y su papel en la prevención de incendios
forestales, celebrada en Madrid el 12 de noviembre
Curso de drones y su utilización en incendios forestales, celebrado en Madrid
entre el 13 y el 16 de noviembre.
Jornadas sobre cumplimentación y tratamiento informático del parte de incendio forestal: EGIFWEB (versión HTML 5), celebradas en Madrid el 21 y 27
de noviembre
Curso Superior de Seguridad e Investigación de Accidentes en Incendios
Forestales, celebrado en Madrid del 10 al 14 de diciembre
Curso de Director Técnico de Extinción en incendios forestales Nivel intermedio (DTE-B) 26 a 29 de noviembre y 17 a 19 de diciembre. 3.2.2 Equipos de Prevención Integral (EPRIF) En 2018 los EPRIF estuvieron operativos desde el 11 de enero hasta el 31 de mayo y retomaron los trabajos desde el 5 de noviembre hasta el 21 de diciembre, completando un máximo de 6 meses de trabajo al finalizar el año. Durante este periodo los EPRIF han trabajado en la realización de actividades formativas y reuniones con diversos colectivos, principalmente ganaderos, agricultores, cazadores, asociaciones de vecinos, representantes de ayuntamientos o profesores, con el objeto de conciliar intereses y concienciar en la prevención de incendios forestales. Cabe destacar a su vez el tratamiento de 526 hectáreas a través de la ejecución de 100 quemas prescritas y controladas, todas ellas conducentes a reducir el riesgo de incendios forestales mediante la disminución de la carga del combustible forestal y la creación de discontinuidades en la vegetación, al tiempo que se alcanzan otros objetivos entre los que figuran la mejora de pastos, favorecer el hábitat de diversas
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 12 especies o mejorar la accesibilidad en el monte. A pesar de que en todo el año se prepararon un total de 655 parcelas para la realización de quemas, las condiciones meteorológicas no permitieron la ejecución de todas ellas. Para la ejecución de las quemas los EPRIF situados en Huesca, Tabuyo (León), Cangas del Narcea (Asturias), Pola de Lena (Asturias) y Gredos (Ávila) recibieron ocasionalmente el apoyo de las Brigadas de Labores Preventivas del MAPA con bases próximas a la zona de actuación. 3.2.3 Brigadas de Labores Preventivas (BLP) Las Brigadas de Labores Preventivas del MAPA actuaron, en colaboración con las administraciones autonómicas, desde principios de año hasta el comienzo de la campaña de verano. Una vez terminada la campaña de verano se retomaron los trabajos de prevención, que finalizaron a mediados del mes de diciembre, ampliando así el periodo de trabajo a unos 11 meses. Durante estos dos periodos realizaron trabajos de prevención de incendios en más de 1.381 hectáreas de terrenos forestales, que consistieron principalmente en clareos, podas y desbroces. En total más de 400 trabajadores, distribuidos en las 10 Brigadas de Labores Preventivas, ejecutaron trabajos de selvicultura preventiva en montes próximos al entorno de las mismas bases BRIF donde desarrollan su trabajo durante las campañas de extinción de incendios forestales. Como se ha señalado en el apartado anterior, algunas BLP trabajaron ocasionalmente en apoyo a los EPRIF para la ejecución de quemas prescritas.
- 3 Actuaciones de extinción
- 3.1 Medios humanos: Brigadas de Refuerzo contra incendios
forestales (BRIF) El MAPA despliega cinco BRIF-i durante la campaña de invierno-primavera, en el Noroeste de la Península, y diez BRIF durante la campaña de verano distribuidas por todo el territorio nacional, como se recoge en los mapas anexos. En la campaña de verano las BRIF se componen de tres turnos formados cada uno por 2 capataces y 14 especialistas, bajo el mando de 1 técnico; para el transporte y apoyo a la extinción cuentan con dos helicópteros de transporte y extinción con 1.200 litros de capacidad. En el Puerto del Pico (Ávila) se dispone de una brigada tipo BRIF- B, que es de menor tamaño y de composición igual a las brigadas de la campaña de invierno BRIF-i, en tres turnos de 7 especialistas, 1 capataz y 1 técnico dotados de un sólo helicóptero.
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 13 BRIF Tabuyo del Monte retirándose del incendio de Hermisende (Zamora), 28/08/2018. Estas unidades helitransportadas de personal altamente especializado en la extinción de incendios forestales, pueden actuar en cualquier punto del territorio nacional en el que sean necesarios. El personal de las BRIF recibe una formación y entrenamiento continuados que les permiten actuar en situaciones de máxima exigencia, asumiendo, en ocasiones, los sectores más complicados del incendio. El dominio de todas las técnicas de extinción, incluido el empleo del contrafuego, es imprescindible en su actuación. En la campaña de 2018 las BRIF trabajaron 774 horas en incendio, repartidas en 149 intervenciones, realizando un total de 101.958 metros de longitud de línea combatida. Las BRIF con más actuaciones durante esta campaña ha sido la de Pinofranqueado (Cáceres), con 35 intervenciones sumando las de la campaña de verano e invierno. Durante la campaña de invierno la BRIF de Ruente (Cantabria) fue la que más intervenciones realizó, un total de 18; esta BRIF sólo está operativa durante los meses de invierno-primavera.
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 14 3.3.2 Medios aéreos: aviones anfibios, helicópteros bombarderos, helicópteros de transporte El MAPA cuenta con un despliegue de medios aéreos gestionado desde el Área de Defensa contra Incendios Forestales, que cubre la superficie forestal nacional durante todo el año. Durante los dos periodos de mayor ocurrencia de incendios forestales, que son las campañas de invierno y verano, el número de medios disponibles se refuerza. Actuación de BRIF Daroca con apoyo de helicóptero en el incendio de Llutxent (Valencia), 7/08/2018
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 15 Durante el año 2018, los medios aéreos del MAPA realizaron un total de 715intervenciones en la extinción de incendios forestales, en apoyo a los dispositivos de las respectivas comunidades autónomas y a otros países. En total volaron 1.842 horas en incendio, realizando 8.786 descargas sobre las llamas. En la tabla siguiente se detalla la distribución de actuaciones por comunidades autónomas y en otros países. Comunidad Autónoma Incendios Intervenciones Horas voladas en incendio Descargas Andalucía 42 75 222:15 1.236 Aragón 8 10 13:41 83 Asturias, Principado de 17 30 79:17 503 Balears, Illes 18 18 18:51 48 Canarias 3 4 5:20 35 Cantabria 18 19 42:22 194 Castilla León 38 85 183:55 871 Castilla-La Mancha 12 12 39:09 228 Cataluña 14 31 47:15 120 Comunidad Valenciana 4 49 237:47 755 Extremadura 43 106 283:16 1.609 Galicia 72 236 546:48 2.725 Madrid, Comunidad de Sin intervención Murcia, Región de 2 2 4:00 21 Navarra, Comunidad Foral de 9 11 10:42 27 País Vasco Sin intervención Rioja, La 5 7 5:39 11 Ceuta 1 3 9:15 92 Melilla Sin intervención TOTAL NACIONAL 306 703 1749:32 8.558 Portugal 1 12 92:39 228 La página siguiente recoge sobre mapa los incendios con intervención de medios de extinción del MAPA durante 2018.
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 16
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 17
- 4. Actividad en el ámbito internacional
Durante el 2018 el MAPA participó en las siguientes reuniones internacionales:
Reunión del Grupo Informal de países con aviones Canadair, celebrada en
Zagreb (Croacia) el 19 de enero.
Taller sobre gestión del riesgo por incendio forestal “Under a new wildland fire context: how to face mega-fires in Europe”, celebrado en Lisboa (Portugal) el
15 y16 de febrero.
Reunión del Proyecto Europeo FIRE-IN, Fire and Rescue Innovation Network,
celebrada en Berlín el 28 de febrero.
Foro Europeo de Protección Civil 2018 "Civil Protection in a Changing Risk
Landscape", celebrado en Bruselas el 5 y 6 de marzo.
Reuniones del EU Forest Fire Prone Countries Expert Group (DG ECHO), celebradas en Bruselas el 26 de enero, 16 de marzo, 17 de mayo y 6 de
noviembre.
Reunión del Comité Internacional de Coordinación (ILC) de las Conferencias Internacionales sobre Incendios Forestales, celebrada en Brasil el 7, 8 y 9 de
marzo.
Reunión del Grupo de Expertos en Incendios Forestales de la Comisión
Europea (DG ENV), celebrada en Bruselas, el 23 de abril.
Reunión anual de preparación de la campaña de incendios forestales de la
Comisión Europea (DG ECHO), celebrada en Bruselas, el 18 de mayo.
Reunión del Task force para el desarrollo de un Decision support system(JRC-
DG ECHO), celebrada en Ispra, el 5 y 6 de junio.
Reuniones conjuntas del Grupo asesor y de la Red Global de Incendios Forestales (GFMC), y del Comité Internacional de Coordinación (ILC),
celebradas en Friburgo (Alemania), del 12 al 14 de octubre.
Taller sobre la figura del oficial de enlace en operaciones de extinción de incendios forestales en regiones transfronterizas España-Portugal, celebrado
en Portugal, del 6 al 8 de noviembre.
Reunión del Grupo de Expertos en Incendios Forestales de la Comisión
Europea (DG ENV), celebrada en España, del 20 al 21 de noviembre.
Taller del grupo de trabajo de incendios forestales de la Red Silva Mediterránea
(FAO), celebrado en España, del 21 al 23 de noviembre.
Durante el 2018 se recibieron en el MAPA las visitas de las siguientes delegaciones: o Joint Research Center (European Commission) o Israel o Corea del Sur o Portugal
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 18
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 19
- Anexos
- 1 Avance estadístico Incendios Forestales (1 enero al 31 de diciembre)
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 20 Datos por comunidades autónomas. Año 2018 Conatos Incendios < 1 ha ≥1 ha Arbolada Matorral y M.Bajo Total % Arbolada % Forestal Alava 9 2 11 0,23 1,95 2,18 2,06 4,24 0,000 0,002 Guipúzcoa 10 2 12 1,29 2,94 4,23 7,32 11,55 0,001 0,008 Vizcaya 17 7 24 18,50 9,59 28,09 2,88 30,97 0,005 0,020 PAIS VASCO 36 11 47 20,02 14,48 34,50 12,26 46,76 0,005 0,010 Barcelona 103 5 108 9,70 16,71 26,41 1,76 28,17 0,003 0,006 Girona 53 7 60 18,90 17,43 36,33 0,13 36,46 0,004 0,009 Lleida 51 15 66 12,63 26,66 39,29 13,11 52,40 0,005 0,007 Tarragona 76 8 84 20,05 14,53 34,58 1,95 36,53 0,001 0,011 CATALUÑA 283 35 318 61,28 75,33 136,62 16,94 153,56 0,004 0,008 A Coruña 325 53 378 165,56 201,43 366,99 0,00 366,99 0,035 0,073 Lugo 156 42 198 60,97 379,56 440,53 0,00 440,53 0,021 0,067 Ourense 410 108 518 281,19 1.051,10 1.332,29 0,00 1.332,29 0,129 0,231 Pontevedra 298 44 342 231,91 246,37 478,28 0,00 478,28 0,017 0,160 GALICIA (*) 1.189 247 1.436 739,63 1.878,46 2.618,09 0,00 2.618,09 0,053 0,128 Almería 69 21 90 16,04 349,93 365,97 0,00 365,97 0,012 0,062 Cadiz 77 16 93 43,13 202,97 246,10 0,00 246,10 0,021 0,068 Córdoba 55 23 78 43,44 162,73 206,17 0,00 206,17 0,009 0,031 Granada 72 16 88 7,20 82,02 89,22 0,00 89,22 0,003 0,014 Huelva 82 22 104 1.039,15 920,81 1.959,96 0,00 1.959,96 0,192 0,248 Jaén 69 9 78 8,54 98,50 107,04 0,00 107,04 0,002 0,017 Málaga 50 13 63 23,75 188,08 211,83 0,00 211,83 0,014 0,059 Sevilla 43 18 61 25,36 54,50 79,86 0,00 79,86 0,009 0,019 ANDALUCIA () 517 138 655 1.206,61 2.059,54 3.266,15 0,00 3.266,15 0,048 0,073 ASTURIAS 357 281 638 196,57 1.781,70 1.978,27 76,35 2.054,62 0,044 0,267 CANTABRIA 188 380 568 572,50 3.337,20 3.909,70 685,90 4.595,60 0,278 1,261 LA RIOJA () 26 9 35 28,16 29,29 57,45 0,00 57,45 0,018 0,018 MURCIA 110 8 118 20,36 27,24 47,60 9,31 56,91 0,007 0,011 Alicante 83 12 95 44,09 69,34 113,43 0,00 113,43 0,041 0,044 Castellón 83 8 91 5,48 371,40 376,88 0,00 376,88 0,002 0,089 Valencia 172 20 192 254,33 2.976,00 3.230,33 0,00 3.230,33 0,087 0,552 COM. VALENCIANA 338 40 378 303,90 3.416,74 3.720,64 0,00 3.720,64 0,049 0,294 Huesca 57 16 73 11,14 63,50 74,64 0,00 74,64 0,002 0,008 Teruel 50 7 57 2,35 33,79 36,14 0,00 36,14 0,000 0,004 Zaragoza 68 28 96 17,41 86,62 104,03 0,00 104,03 0,005 0,014 ARAGÓN () 175 51 226 30,90 183,91 214,81 0,00 214,81 0,002 0,008 Albacete 78 11 89 37,73 26,95 64,68 5,13 69,81 0,010 0,011 Ciudad Real 45 29 74 90,91 355,43 446,34 113,87 560,21 0,019 0,063 Cuenca 66 6 72 18,83 10,07 28,90 8,86 37,76 0,003 0,005 Guadalajara 72 7 79 2,72 58,43 61,15 4,99 66,14 0,001 0,009 Toledo 160 74 234 34,45 198,53 232,98 280,71 513,69 0,011 0,100 CASTILLA LA MANCHA 421 127 548 184,64 649,41 834,05 413,56 1.247,61 0,008 0,035 Las Palmas de Gran Canaria 17 1 18 0,00 1,45 1,45 5,40 6,86 0,000 0,002 S.C. de Tenerife 30 2 32 402,93 4,21 407,14 0,24 407,38 0,387 0,159 CANARIAS 47 3 50 402,93 5,67 408,60 5,64 414,24 0,330 0,073 NAVARRA 122 86 208 62,02 194,54 256,56 55,34 311,90 0,015 0,052 Badajoz 99 137 236 245,18 440,50 685,68 1.265,76 1.951,44 0,031 0,166 Cáceres 294 150 444 202,61 864,27 1.066,88 553,65 1.620,53 0,023 0,104 EXTREMADURA 393 287 680 447,79 1.304,77 1.752,56 1.819,41 3.571,97 0,027 0,131 ILLES BALEARS 69 3 72 22,80 3,80 26,60 0,70 27,30 0,013 0,012 MADRID 234 21 255 2,55 6,84 9,39 93,07 102,46 0,001 0,023 Avila 94 24 118 138,36 36,51 174,87 35,89 210,76 0,064 0,033 Burgos 51 18 69 14,64 36,24 50,88 16,31 67,19 0,003 0,007 León 115 88 203 165,23 1.066,34 1.231,57 160,34 1.391,91 0,034 0,123 Palencia 32 12 44 11,12 15,20 26,32 12,33 38,65 0,007 0,010 Salamanca 122 39 161 86,34 94,86 181,20 96,99 278,19 0,020 0,023 Segovia 30 1 31 0,40 0,26 0,66 5,32 5,98 0,000 0,000 Soria 34 1 35 0,35 1,08 1,43 5,15 6,58 0,000 0,000 Valladolid 44 6 50 2,17 1,61 3,78 16,41 20,19 0,002 0,003 Zamora 127 71 198 17,76 450,41 468,17 140,75 608,92 0,008 0,097 CASTILLA Y LEÓN 649 260 909 436,37 1.702,51 2.138,88 489,49 2.628,37 0,016 0,055 CEUTA 0 2 2 0,00 74,00 74,00 0,00 74,00 0,000 0,000 MELILLA 0 0 0 0,00 0,00 0,00 0,00 0,00 0,000 0,000 TOTAL 5.154 1.989 7.143 4.739,03 16.745,43 21.484,46 3.677,98 25.162,44 0,029 0,090 (*) Sin diferenciación entre superficie desarbolada herbácea y leñosa () Sin datos de superficie herbácea Forestal Leñosa respecto a la existente Forestal Herbácea Superficies Total Forestal Num. Siniestros % Superficie PROVINCIA / COM. AUTONOMA Total Siniestros
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 21
- 2. Distribución de los medios del MAPA 2018
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 22
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 23
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 24
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 25
- 3. Actividad de los medios del MAPA 2018
Resumen de actividad de los Equipos de Prevención Integral en incendios forestales (EPRIF). Año 2018 Preparación parcelas Núm Tiempo Sup. Núm Tiempo Núm. Tiempo Sup. forestal Núm. Tiempo Sup. Forestal Asturias Centro 0 0:00 0,00 36 25:40 11 77:30 41,45 0 0:00 0,00 Asturias Este 0 0:00 0,00 70 130:30 17 95:10 52,80 0 0:00 0,00 Asturias Oeste 0 0:00 0,00 9 31:00 5 19:00 7,02 0 0:00 0,00 Ávila 0 0:00 0,00 29 127:00 0 0:00 0,00 0 0:00 0,00 Cáceres 0 0:00 0,00 22 51:30 2 13:13 18,50 0 0:00 0,00 Cantabria 0 0:00 0,00 52 149:00 2 13:00 5,78 0 0:00 0,00 Huesca 0 0:00 0,00 8 25:30 0 0:00 0,00 0 0:00 0,00 La Coruña 0 0:00 0,00 55 90:40 4 17:32 28,61 0 0:00 0,00 La Palma 0 0:00 0,00 15 63:00 12 97:50 6,64 0 0:00 0,00 La Rioja 0 0:00 0,00 2 8:30 0 0:00 0,00 0 0:00 0,00 León 0 0:00 0,00 50 167:40 11 77:05 160,37 0 0:00 0,00 Lugo 0 0:00 0,00 34 45:10 4 17:20 16,00 3 21:00 4,50 Navarra Este 0 0:00 0,00 40 72:09 6 38:52 87,50 0 0:00 0,00 Navarra Oeste 0 0:00 0,00 82 139:40 4 25:00 18,02 0 0:00 0,00 Orense 0 0:00 0,00 32 58:10 2 8:00 3,00 1 1:30 2,48 Pontevedra 1 1:25 0,30 55 105:45 14 42:35 42,71 0 0:00 0,00 Valencia 0 0:00 0,00 8 21:15 2 18:05 2,07 0 0:00 0,00 Zamora 1 1:01 6,35 56 89:45 4 28:30 36,08 3 17:15 9,66 TOTAL 2 2:26 6,65 655 1401:54 100 588:42 526,55 7 39:45 16,64 Núm. Tiempo Núm Tiempo Núm. Tiempo Núm. Tiempo Asturias Centro 0 0:00 2 1:30 22 104:30 4 10:50 Asturias Este 0 0:00 8 14:25 10 37:00 8 32:00 Asturias Oeste 0 0:00 0 0:00 91 86:50 4 13:00 Ávila 0 0:00 10 42:30 27 67:40 10 57:00 Cáceres 0 0:00 13 6:45 17 65:05 1 6:00 Cantabria 0 0:00 16 34:00 10 20:30 4 21:00 Huesca 0 0:00 6 10:00 69 70:20 6 25:45 La Coruña 0 0:00 61 25:30 14 39:40 2 6:00 La Palma 0 0:00 6 33:00 37 48:21 6 39:30 La Rioja 0 0:00 2 7:30 38 41:26 9 30:00 León 0 0:00 0 0:00 32 78:30 7 42:00 Lugo 0 0:00 5 5:30 11 42:00 4 3:05 Navarra Este 0 0:00 40 31:26 33 51:35 0 0:00 Navarra Oeste 0 0:00 16 20:15 37 38:04 2 3:30 Orense 0 0:00 9 9:50 15 63:00 2 1:30 Pontevedra 0 0:00 62 27:20 16 44:30 16 51:30 Valencia 0 0:00 7 9:45 27 85:55 12 108:15 Zamora 0 0:00 17 20:55 124 141:02 9 10:50 TOTAL 0 0:00 280 300:11 630 1125:58 106 461:45 Inv. de Causas EPRIF 646:30 Ev. lab. anteriores 925:10 Reuniones 564:50 698:25 705:15 Formación/Concienciación
- Otras actividades corresponden a trabajos de gabinete, rutas de vigilancia, asistencia a mercados de ganado, etc
614:00 779:30 519:36 703:30 Quema controlada EPRIF Asistencia a incendio Desbroce mecánico 687:55 927:15 657:00 703:00 11931:06 Otras actividades 629:10 652:00 519:04 438:06 560:50
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 26 Resumen de actividad de las Brigadas de Labores Preventivas (BLP). Año 2018 Tratamientos selvícolas Otros trabajos forestales Quemas prescritas Trabajos con maquinaria auxiliar Total Daroca 232,56 0 0 1,5 234,06 La Iglesuela 143,37 0 0 0 143,37 Laza 95,66 0 3,17 0 98,83 Lubia 178,12 0 1,05 0 179,17 Pinofranqueado 81,5 0 20 2,7 104,2 Prado de los Esquiladores 90 0 0 15 105 Puerto del Pico 29,58 0 0 0 29,58 Puntagorda 52,98 0 8,12 0 61,1 Tabuyo del Monte 159,37 0 94,72 0 254,09 Tineo 93,2 ** 79,2 0 172,4 TOTAL 1156,34 0 206,26 19,20 1381,8 Revisión y acondicionamiento de 36 puntos de agua Retirada de árboles de pistas forestales en 14 ubicaciones Base Superficie (ha) ** Otros trabajos forestales Tineo:
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 27 Ataque Directo y A. Remate y otros Laza 01-mar 29-abr 1 1 3:28 1:17 1 1 310 0 Pinofranqueado 01-feb 01-abr 12 12 51:14 18:49 3 3 5.209 407 Ruente 22-feb 07-may 18 18 42:38 23:32 1 1 10.285 150 Tabuyo del Monte 22-feb 22-abr 3 3 14:07 6:48 3 3 2.124 0 Tineo 01-mar 29-abr. 5 5 12:22 6:52 1 1 1.445 200 39 XXX* 123:49 57:18 XXX* XXX* 19.373 757 Puerto el Pico 15-jun 14-oct 16 15 47:24 31:20 2 2 2.281 3.757 16 XXX* 47:24 31:20 XXX* XXX* 2.281 3.757 Cuenca 01-jun 30-sep 4 3 59:54 14:00 2 2 835 1.210 Daroca 15-jun. 14-oct. 2 2 52:27 15:59 2 2 2.947 200 La Iglesuela 15-jun. 14-oct. 10 9 91:23 39:27 5 4 13.897 2.887 Laza 15-jun. 14-oct. 31 25 154:28 82:56 4 2 19.034 2.801 Lubia 1-jul. 30-oct. 1 1 11:20 3:40 1 1 450 0 Pinofranqueado 15-jun. 14-oct. 23 19 119:31 46:56 3 2 9.737 9.207 Puntagorda 15-jun. 14-oct. 2 2 5:58 2:38 1 1 130 60 Tabuyo del Monte 15-jun. 14-oct. 7 7 36:00 15:51 3 2 4.572 1.333 Tineo 1-jul. 30-oct. 14 12 72:25 35:13 3 2 5.510 980 94 XXX* 603:26 256:40 XXX* XXX* 57.112 18.678 149 XXX* 774:39 345:18 XXX* XXX* 78.766 23.192
- XXX No se puede totalizar el número de incendios, Provincias y Comunidades Autónomas atendidas ya que en un mismo incendio, Provincia o Comunidad Autónoma pueden haber intervenido
medios de distintas bases Long. Línea (m.) CUADRO Nº 7. RESUMEN ACTIVIDAD EN INCENDIO DE LAS BRIF - AÑO 2018 BRIF El nº de salidas contabiliza las salidas totales de la base en extinción de incendios. Hay más de una salida a un mismo incendio cuando en este trabajan varios turnos de brigadas Fecha inicio actividad BRIF* Fecha fin actividad BRIF Nº salidas Nº incendios Tiempo total incendio *Periodo de formación: todas las brigadas reciben formación en la quincena anterior a la fecha de inicio de actividad. El nº de incendios contabiliza los incendios en los que ha intervenido la BRIF de la base El tiempo total en incendio computa desde la salida a regreso a base de la Brigada El tiempo real en extinción computa el tiempo dedicado al combate del fuego sin incluir tiempos de transporte, esperas, descansos, etc El Núm. Prov.y el Núm. CCAA indica el número de provincias y CCAA en las que ha intervenido en extinción cada base BRIF Long. Linea incluye longitud de frente combatido en metros, diferenciando dos grupos: 1.-trabajos de ataque directo e indirecto y 2.-labores de remate, liquidación u otros tipos de actuación T. real extinción Nº Prov. Nº CCAA Total BRIF Total BRIF-i Total BRIF-B Total BRIF-A Resumen de actividad de las Brigadas de Refuerzo contra Incendios Forestales (BRIF). Año 2018
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 28 Resumen de actuación de las Brigadas de Refuerzo contra incendios Forestales (BRIF) por comunidad autónoma. Año 2018 Localización BRIF Num. Int. Num. Inc. T. ext. T. Línea Num. Int. Num. Inc. T. ext. T. Línea Num. Int. Num. Inc. T. ext. T. Línea Num. Int. Num. Inc. T. ext. T. Línea Num. Int. Num. Inc. T. ext. T. Línea Num. Int. Num. Inc. T. ext. T. Línea Laza 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Pinofranqueado 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Ruente 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 18 18 23:32 10.435 Tabuyo del Monte 0 0 0:00 0 0 0 0:00 0 1 1 1:25 200 0 0 0:00 0 0 0 0:00 0 1 1 3:32 1.492 Tineo 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 5 5 6:52 1.645 0 0 0:00 0 Total BRIF-i 0 XXX* 0:00 0 0 XXX* 0:00 0 1 XXX* 1:25 200 0 XXX* 0:00 0 5 XXX* 6:52 1.645 19 XXX* 27:04 11.927 Puerto el Pico 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Total BRIF-B 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 Cuenca 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Daroca 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 La Iglesuela 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Laza 0 0 0:00 0 0 0 0:00 0 30 24 81:39 21.525 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Lubia 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Pinofranqueado 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Puntagorda 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Tabuyo del Monte 0 0 0:00 0 0 0 0:00 0 1 1 2:10 732 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Tineo 0 0 0:00 0 0 0 0:00 0 3 3 11:06 1.810 0 0 0:00 0 11 9 24:07 4.680 0 0 0:00 0 Total BRIF-A 0 XXX* 0:00 0 0 XXX* 0:00 0 34 XXX* 94:55 24.067 0 XXX* 0:00 0 11 XXX* 24:07 4.680 0 XXX* 0:00 0 Total BRIF 0 XXX* 0:00 0 0 XXX* 0:00 0 35 XXX* 96:20 24.267 0 XXX* 0:00 0 16 XXX* 30:59 6.325 19 XXX* 27:04 11.927 Localización BRIF Num. Int. Num. Inc. T. ext. T. Línea Num. Int. Num. Inc. T. ext. T. Línea Num. Int. Num. Inc. T. ext. T. Línea Num. Int. Num. Inc. T. ext. T. Línea Num. Int. Num. Inc. T. ext. T. Línea Num. Int. Num. Inc. T. ext. T. Línea Laza 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Pinofranqueado 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 2 2 4:00 1.505 0 0 0:00 0 Ruente 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Tabuyo del Monte 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Tineo 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Total BRIF-i 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 2 XXX* 4:00 1.505 0 XXX* 0:00 0 Puerto el Pico 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Total BRIF-B 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 0 XXX* 0:00 0 Cuenca 0 0 0:00 0 0 0 0:00 0 2 1 11:19 998 0 0 0:00 2 2 2:41 1.047 0 0 0:00 0 Daroca 0 0 0:00 0 0 0 0:00 0 1 1 14:40 2.947 1 1 1:19 200 0 0 0:00 0 0 0 0:00 0 La Iglesuela 0 0 0:00 0 0 0 0:00 0 1 1 14:04 9.599 0 0 0:00 0 4 4 6:13 3.744 0 0 0:00 0 Laza 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Lubia 0 0 0:00 0 0 0 0:00 0 1 1 3:40 450 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Pinofranqueado 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Puntagorda 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 2 2 2:38 190 Tabuyo del Monte 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Tineo 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Total BRIF-A 0 XXX* 0:00 0 0 XXX* 0:00 0 5 XXX* 43:43 13.994 1 XXX* 1:19 200 6 XXX* 8:54 4.791 2 XXX* 2:38 190 Total BRIF 0 XXX* 0:00 0 0 XXX* 0:00 0 5 XXX* 43:43 13.994 1 XXX* 1:19 200 8 XXX* 12:54 6.296 2 XXX* 2:38 190 Localización BRIF Num. Int. Num. Inc. T. ext. T. Línea Num. Int. Num. Inc. T. ext. T. Línea Num. Int. Num. Inc. T. ext. T. Línea Num. Int. Num. Inc. T. ext. T. Línea Num. Int. Num. Inc. T. ext. T. Línea Num. Int. Num. Inc. T. ext. T. Línea Laza 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 1:17 310 0 0 0:00 0 Pinofranqueado 0 0 0:00 0 9 9 14:09 3.677 0 0 0:00 0 0 0 0:00 0 1 1 0:40 434 0 0 0:00 0 Ruente 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Tabuyo del Monte 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 1:51 432 0 0 0:00 0 Tineo 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Total BRIF-i 0 XXX* 0:00 0 9 XXX* 14:09 3.677 0 XXX* 0:00 0 0 XXX* 0:00 0 3 XXX* 3:48 1.176 0 XXX* 0:00 0 Puerto el Pico 0 0 0:00 0 1 1 5:52 1.395 0 0 0:00 0 0 0 0:00 0 15 14 25:28 4.643 0 0 0:00 0 Total BRIF-B 0 XXX* 0:00 0 1 XXX* 5:52 1.395 0 XXX* 0:00 0 0 XXX* 0:00 0 15 XXX* 25:28 4.643 0 XXX* 0:00 0 Cuenca 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Daroca 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 La Iglesuela 0 0 0:00 0 1 1 1:25 353 0 0 0:00 0 0 0 0:00 0 4 3 17:45 3.088 0 0 0:00 0 Laza 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 1:17 310 0 0 0:00 0 Lubia 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Pinofranqueado 0 0 0:00 0 22 18 46:06 18.494 0 0 0:00 0 0 0 0:00 0 1 1 0:50 450 0 0 0:00 0 Puntagorda 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Tabuyo del Monte 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 6 6 13:41 5.173 0 0 0:00 0 Tineo 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 Total BRIF-A 0 XXX* 0:00 0 23 XXX* 47:31 18.847 0 XXX* 0:00 0 0 XXX* 0:00 0 12 XXX* 33:33 9.021 0 XXX* 0:00 0 Total BRIF 0 XXX* 0:00 0 33 XXX* 67:32 23.919 0 XXX* 0:00 0 0 XXX* 0:00 0 30 XXX* 62:49 14.840 0 XXX* 0:00 0
- XXX No se puede totalizar el número de incendios atendidos ya que en un mismo incendio pueden haber intervenido medios de distintas bases
CANARIAS CANTABRIA LA RIOJA MURCIA C. VALENCIANA ARAGÓN CASTILLA LA MANCHA CASTILLA Y LEÓN NAVARRA EXTREMADURA I. BALEARS MADRID PORTUGAL ASTURIAS GALICIA ANDALUCÍA PAÍS VASCO CATALUÑA
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 29 Resumen de actuación de los medios del MAPA. Aviones y helicópteros de extinción. Año 2018 Núm. Núm misiones incendios F. alarma Con Sin Incendio atendidos Inc. Contr. Retardante Retardante TORREJON (precampaña) CL-215T / CL-415 01/01 a 15/06 2-3 13 5 3 22:10 0:00 0:00 13:00 35:10 6 26 32 TORREJON (campaña) CL-215T / CL-415 16/06 a 30/09 3 - 4 46 11 4 74:30 0:00 1:55 84:00 160:25 48 112 160 TORREJON (postcampaña) CL-215T / CL-415 01/10 a 31/12 2- 4 0 0 0 0:00 0:00 0:00 0:00 0:00 0 0 0 LABACOLLA CL-215T / CL-415 01/07 a 30/09 2 - 3 61 55 27 162:35 0:00 4:52 0:00 167:27 158 657 815 ZARAGOZA CL-215T / CL-415 16/06 a 30/09 1 - 2 5 3 1 22:35 0:00 0:00 5:15 27:50 14 47 61 POLLENSA CL-215T / CL-415 01/06 a 30/09 1 4 2 2 11:45 0:00 0:00 5:15 17:00 25 16 41 MALAGA CL-215T / CL-415 16/06 a 30/09 1 - 2 16 14 7 53:30 0:00 0:00 2:00 55:30 162 94 256 LOS LLANOS CL-215T / CL-415 16/06 a 15/08 1 3 2 1 8:30 0:00 0:00 2:30 11:00 1 24 25 MATACAN CL-215T / CL-415 16/06 a 15/10 1 35 30 15 96:16 0:00 2:33 2:30 101:19 32 280 312 TALAVERA CL-215T / CL-415 01/07 a 30/09 1 17 16 14 37:55 0:00 0:00 1:28 39:23 58 94 152 2-3 200 138 XXX * 489:46 0:00 9:20 115:58 615:04 504 1.350 1.854 MATACAN (precampaña) ACO 15/02 a 30/06 1 32 4 4 10:05 0:00 0:25 43:38 54:08 XXX ** XXX ** XXX ** LEÓN ACO 01/07 a 15/10 1 35 18 16 48:14 0:00 0:18 21:02 69:34 XXX ** XXX ** XXX ** ZARAGOZA ACO 16/07 a 15/10 1 14 1 1 2:10 0:00 0:00 18:55 21:05 XXX ** XXX ** XXX ** TALAVERA ACO 01/07 a 30/09 1 31 17 16 50:10 0:00 1:23 22:19 73:52 XXX ** XXX ** XXX ** MUCHAMIEL ACO 01/07 a 30/09 1 20 6 2 21:31 0:00 0:00 18:06 39:37 XXX ** XXX ** XXX ** 2 132 46 XXX * 132:10 0:00 2:06 124:00 258:16 XXX ** XXX ** XXX ** XINZO DE LIMIA Airtractor 802 01/07 a 30/09 2 79 57 29 52:54 0:00 1:09 16:21 70:24 34 101 135 NOAIN Airtractor 802 01/07 a 30/09 1 23 11 10 10:42 0:00 1:36 9:12 21:30 0 27 27 SON BONET Airtractor 802 01/07 a 30/09 1 29 17 17 16:06 0:00 3:25 9:58 29:29 15 18 33 NIEBLA Airtractor 802 01/07 a 30/09 1 26 18 14 28:34 0:00 0:00 5:59 34:33 50 8 58 AMPURIABRAVA Airtractor 802 01/07 a 30/09 2 29 8 4 14:26 0:00 0:52 26:42 42:00 44 0 44 REUS (Aa) Airtractor 802 FB 01/07 a 30/09 2 48 24 12 36:51 2:44 2:00 23:53 65:28 40 54 94 MANISES (Aa) Airtractor 802 FB 01/07 a 30/09 2 36 12 3 44:27 0:00 1:10 22:28 68:05 12 115 127 ROSINOS (Aa) Airtractor 802 FB 01/07 a 15/10 1 - 2 48 28 18 38:46 0:00 1:10 9:52 49:48 0 106 106 LA GOMERA Airtractor 802 01/07 a 30/09 1 13 0 0 0:00 0:00 0:00 19:01 19:01 0 0 0 AGONCILLO Airtractor 802 01/07 a 30/09 2 31 8 6 8:14 0:00 0:08 23:05 31:27 1 14 15 16 362 183 XXX * 251:00 2:44 11:30 166:31 431:45 196 443 639 MUCHAMIEL Kamov K-32A 11BC 01/04 a 30/05 1-2 8 1 1 7:25 0:00 0:00 4:55 12:20 0 44 44 LAS MINAS Kamov K-32A 11BC 22/02 a 03/05 1-2 0 0 0 0:00 0:00 0:50 18:45 19:35 0 0 0 TABUYO DEL MONTE Kamov K-32A 11BC 22/02 a 22/04 1 17 6 6 12:48 0:00 0:54 12:25 26:07 0 74 74 IBIAS Kamov K-32A 11BC 05/03 a 03/05 1 12 3 3 6:00 0:00 0:00 10:57 16:57 0 23 23 LAZA Kamov K-32A 11BC 05/03 a 03/05 1 9 1 1 1:29 0:00 0:00 10:30 11:59 0 4 4 2-5 46 11 XXX * 27:42 0:00 1:44 57:32 86:58 0 145 145 LA ALMORAIMA Kamov K-32A 11BC 16/06 a 15/10 1 39 24 19 71:41 0:00 3:01 8:12 82:54 0 664 664 LAS MINAS Kamov K-32A 11BC 16/06 a 15/10 1 21 3 3 5:06 0:00 0:50 18:13 24:09 0 37 37 LOS RODEOS Kamov K-32A 11BC 01/07 a 30/10 1 24 1 1 1:30 0:00 1:55 35:39 39:04 0 4 4 PLASENCIA DE CÁCERES Kamov K-32A 11BC 16/06 a 15/10 1 39 21 19 47:41 0:00 0:19 16:47 64:47 40 367 407 HUELMA Kamov K-32A 11BC 16/06 a 15/10 1 35 13 12 38:10 0:00 1:35 17:37 57:22 39 230 269 IBIAS Kamov K-32A 11BC 01/07 a 30/10 1 35 24 19 81:51 0:00 0:00 12:30 94:21 0 551 551 CARAVACA Kamov K-32A 11BC 16/06 a 15/10 1 21 6 4 23:55 0:00 0:00 11:15 35:10 0 156 156 PLASENCIA DEL MONTE Kamov K-32A 11BC 01/07 a 30/10 1 22 8 8 10:05 0:00 0:35 13:00 23:40 0 73 73 8 236 100 XXX * 279:59 0:00 8:15 133:13 421:27 79 2.082 2.161 4-8 976 478 XXX * 1180:37 2:44 32:55 597:14 1813:30 779 4.020 4.799 XXX * No se puede totalizar el número de incendios atendidos ya que en un mismo incendio pueden haber intervenido medios de distintas bases XXX ** Los aviones de ACO no realizan descargas Total TOTAL GENERAL Periodo operativo Núm. Aronaves Núm. Misiones TOTAL CL-215T/CL-415 TOTAL ACOs TOTAL Airtractor TOTAL KAMOV invierno TOTAL KAMOV verano BASE TIPO HORAS DE VUELO (hh:mm) Número DESCARGAS en incendio Reconoc. Otras Incendio Total
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 30 Resumen de actuación de los medios del MAPA. Helicópteros de transporte. Año 2018 Núm. Núm. Núm. Núm. Misiones Incendios Falsa Alarma Brigadas Personas Con Sin Incendio Atendidos Inc. Controlado Transpor. Transpor. Espuma Espuma PINOFRANQUEADO Sokol PZL 01/02 a 16/04 1 26 12 12 26:59 0:00 1:04 13:37 41:40 10 86 0 184 184 TABUYO DEL MONTE Bell 412 22/02 a 22/04 1 18 3 3 10:31 0:00 0:55 15:34 27:00 3 27 0 55 55 TINEO Bell 412 03/03 a 01/05 1 15 4 4 7:50 0:00 1:20 12:20 21:30 4 36 0 24 24 LAZA Bell 412 01/03 a 29/04 1 11 1 1 2:46 0:00 1:23 12:01 16:10 1 9 0 18 18 RUENTE Bell 412 22/02 a 07/05 1 27 17 17 31:20 0:00 0:00 13:42 45:02 17 152 0 150 150 TOTAL BRIF-i 5 97 37 XXX * 79:26 0:00 4:42 67:14 151:22 35 310 0 431 431 DAROCA Sokol PZL 15/06 a 14/10 2 62 8 2 33:02 0:00 1:00 71:14 105:16 8 72 0 143 143 CUENCA Sokol PZL 01/06 a 30/09 2 60 8 2 39:01 0:00 1:35 45:56 86:32 8 66 0 152 152 LA IGLESUELA Sokol PZL 15/06 a 14/10 2 71 22 9 77:58 0:00 5:49 31:21 115:08 22 191 0 457 457 PINOFRANQUEADO Sokol PZL 15/06 a 14/10 2 86 40 18 109:52 0:00 8:18 30:22 148:32 32 272 0 819 819 LAZA Sokol PZL 15/06 a 14/10 2 110 58 25 151:16 0:00 3:54 42:39 197:49 64 546 0 1.038 1.038 PUERTO EL PICO Sokol PZL 15/06 a 14/10 1 47 17 17 33:40 0:00 5:35 8:45 48:00 18 159 0 230 230 TINEO Sokol PZL 01/07 a 30/10 2 73 27 12 77:18 0:00 6:12 39:05 122:35 29 255 0 454 454 LUBIA Sokol PZL 01/07 a 30/10 2 46 2 1 15:34 0:00 2:35 45:02 63:11 2 16 0 17 17 TABUYO DEL MONTE Sokol PZL 15/06 a 14/10 2 66 14 7 39:07 0:00 3:30 54:45 97:22 14 110 0 211 211 PUNTAGORDA Sokol PZL 15/06 a 14/10 2 65 4 2 5:20 0:00 8:01 90:55 104:16 2 17 0 35 35 TOTAL BRIF-A y B 19 686 200 XXX * 582:08 0:00 46:29 460:04 1088:41 199 1.704 0 3.556 3.556 TOTAL GENERAL 5 783 237 XXX * 661:34 0:00 51:11 527:18 1240:03 234 2.014 0 3.987 3.987 XXX * No se puede totalizar el número de incendios atendidos ya que en un mismo incendio pueden haber intervenido medios de distintas bases Reconoc. Otras Total Total BASE TIPO HORAS DE VUELO (hh:mm) DESCARGAS Periodo operativo Num. Aeronaves NUM. Misiones Incendio
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 31 Resumen de actuación de los medios del MAPA por comunidad autónoma (I). Aviones y helicópteros de extinción. Año 2018 Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas TORREJON (precampaña) 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 6:40 8 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 TORREJON (campaña) 0 0 0:00 0 0 0 0:00 0 1 1 3:00 3 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 TORREJON (postcampaña) 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 LABACOLLA 0 0 0:00 0 0 0 0:00 0 55 27 162:35 815 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 ZARAGOZA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 3 1 22:35 61 0 0 0:00 0 POLLENSA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 9:00 26 0 0 0:00 0 MALAGA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 13 6 50:10 234 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 LOS LLANOS 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 2 1 8:30 25 0 0 0:00 0 MATACAN 0 0 0:00 0 0 0 0:00 0 8 5 26:23 92 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 TALAVERA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 4 2 11:04 69 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 TOTAL CL-215T/CL-415 0 XXX * 0:00 0 0 XXX * 0:00 0 64 XXX * 191:58 910 18 XXX * 67:54 311 0 XXX * 0:00 0 0 XXX * 0:00 0 0 XXX * 0:00 0 0 XXX * 0:00 0 6 XXX * 40:05 112 0 XXX * 0:00 0 MATACAN (precampaña) 0 0 0:00 XXX ** 0 0 0:00 XXX ** 1 1 2:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** LEÓN 0 0 0:00 XXX ** 0 0 0:00 XXX ** 13 11 32:55 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** ZARAGOZA 0 0 0:00 XXX ** 1 1 2:10 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** TALAVERA 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 5 4 18:11 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** MUCHAMIEL 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 6 2 21:31 XXX ** 0 0 0:00 XXX ** TOTAL ACOs 0 XXX * 0:00 XXX ** 1 XXX * 2:10 XXX ** 14 XXX * 34:55 XXX ** 5 XXX * 18:11 XXX ** 0 XXX * 0:00 XXX ** 0 XXX * 0:00 XXX ** 0 XXX * 0:00 XXX ** 0 XXX * 0:00 XXX ** 6 XXX * 21:31 XXX ** 0 XXX * 0:00 XXX ** XINZO DE LIMIA 0 0 0:00 0 0 0 0:00 0 57 29 52:54 135 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 NOAIN 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 SON BONET 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 NIEBLA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 18 14 28:34 58 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 AMPURIABRAVA 0 0 0:00 0 8 4 14:26 44 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 REUS (Aa) 0 0 0:00 0 22 11 30:39 76 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 2 1 6:12 18 0 0 0:00 0 MANISES (Aa) 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 12 3 44:27 127 0 0 0:00 0 ROSINOS (Aa) 0 0 0:00 0 0 0 0:00 0 10 8 14:58 41 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 LA GOMERA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 AGONCILLO 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 7 5 5:39 11 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 TOTAL Airtractor 0 XXX * 0:00 0 30 XXX * 45:05 120 67 XXX * 67:52 176 18 XXX * 28:34 58 0 XXX * 0:00 0 0 XXX * 0:00 0 7 XXX * 5:39 11 0 XXX * 0:00 0 14 XXX * 50:39 145 0 XXX * 0:00 0 MUCHAMIEL 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 7:25 44 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 LAS MINAS 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 TABUYO DEL MONTE 0 0 0:00 0 0 0 0:00 0 1 1 2:02 16 0 0 0:00 0 0 0 0:00 0 1 1 5:28 20 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 IBIAS 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 3 3 6:00 23 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 LAZA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 TOTAL KAMOV invierno 0 XXX * 0:00 0 0 XXX * 0:00 0 1 XXX * 2:02 16 1 XXX * 7:25 44 3 XXX * 6:00 23 1 XXX * 5:28 20 0 XXX * 0:00 0 0 XXX * 0:00 0 0 XXX * 0:00 0 0 XXX * 0:00 0 LA ALMORAIMA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 22 18 65:46 594 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 LAS MINAS 0 0 0:00 0 0 0 0:00 0 1 1 1:59 11 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 LOS RODEOS 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 PLASENCIA DE CÁCERES 0 0 0:00 0 0 0 0:00 0 2 2 4:00 26 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 HUELMA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 11 10 34:25 229 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 IBIAS 0 0 0:00 0 0 0 0:00 0 18 13 61:16 398 0 0 0:00 0 4 4 13:16 117 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 CARAVACA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 2 2 4:00 21 3 1 17:20 119 0 0 0:00 0 PLASENCIA DEL MONTE 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 8 8 10:05 73 TOTAL KAMOV verano 0 XXX * 0:00 0 0 XXX * 0:00 0 21 XXX * 67:15 435 33 XXX * 100:11 823 4 XXX * 13:16 117 0 XXX * 0:00 0 0 XXX * 0:00 0 2 XXX * 4:00 21 3 XXX * 17:20 119 8 XXX * 10:05 73 TOTAL 0 XXX * 0:00 0 31 XXX * 47:15 120 167 XXX * 364:02 1.537 75 XXX * 222:15 1.236 7 XXX * 19:16 140 1 XXX * 5:28 20 7 XXX * 5:39 11 2 XXX * 4:00 21 29 XXX * 129:35 376 8 XXX * 10:05 73 MURCIA BASE CATALUÑA GALICIA
- XXX No se puede totalizar el número de incendios atendidos ya que en un mismo incendio pueden haber intervenido medios de distintas bases
C.VALENCIANA PAÍS VASCO LA RIOJA ANDALUCÍA ASTURIAS CANTABRIA ARAGÓN
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 32 Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas Num. Int. Num. Inc. Horas Descargas TORREJON (precampaña) 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 2 1 8:50 21 0 0 0:00 0 0 0 0:00 0 2 1 6:40 3 0 0 0:00 0 0 0 0:00 0 TORREJON (campaña) 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 8:40 23 0 0 0:00 0 0 0 0:00 0 1 1 2:00 1 0 0 0:00 0 8 1 60:50 133 TORREJON (postcampaña) 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 LABACOLLA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 ZARAGOZA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 POLLENSA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 2:45 15 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 MALAGA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 3:20 22 0 0 0:00 0 LOS LLANOS 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 MATACAN 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 8 4 19:46 48 0 0 0:00 0 0 0 0:00 0 10 5 18:18 77 0 0 0:00 0 4 1 31:49 95 TALAVERA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 12 12 26:51 83 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 TOTAL CL-215T/CL-415 0 XXX * 0:00 0 0 XXX * 0:00 0 0 XXX * 0:00 0 23 XXX * 64:07 175 1 XXX * 2:45 15 0 XXX * 0:00 0 13 XXX * 26:58 81 1 XXX * 3:20 22 12 XXX * 92:39 228 MATACAN (precampaña) 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 2 2 5:55 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 1 1 2:10 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** LEÓN 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 5 5 15:19 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** ZARAGOZA 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** TALAVERA 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 12 12 31:59 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** MUCHAMIEL 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** 0 0 0:00 XXX ** TOTAL ACOs 0 XXX * 0:00 XXX ** 0 XXX * 0:00 XXX ** 0 XXX * 0:00 XXX ** 14 XXX * 37:54 XXX ** 0 XXX * 0:00 XXX ** 0 XXX * 0:00 XXX ** 6 XXX * 17:29 XXX ** 0 XXX * 0:00 XXX ** 0 XXX * 0:00 XXX ** XINZO DE LIMIA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 NOAIN 0 0 0:00 0 0 0 0:00 0 11 10 10:42 27 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 SON BONET 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 17 17 16:06 33 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 NIEBLA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 AMPURIABRAVA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 REUS (Aa) 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 MANISES (Aa) 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 ROSINOS (Aa) 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 18 10 23:48 65 0 0 0:00 0 0 0 0:00 0 LA GOMERA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 AGONCILLO 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 2:35 4 0 0 0:00 0 0 0 0:00 0 TOTAL Airtractor 0 XXX * 0:00 0 0 XXX * 0:00 0 11 XXX * 10:42 27 0 XXX * 0:00 0 17 XXX * 16:06 33 0 XXX * 0:00 0 19 XXX * 26:23 69 0 XXX * 0:00 0 0 XXX * 0:00 0 MUCHAMIEL 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 LAS MINAS 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 TABUYO DEL MONTE 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 4 4 5:18 38 0 0 0:00 0 0 0 0:00 0 IBIAS 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 LAZA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 1 1 1:29 4 0 0 0:00 0 0 0 0:00 0 TOTAL KAMOV invierno 0 XXX * 0:00 0 0 XXX * 0:00 0 0 XXX * 0:00 0 0 XXX * 0:00 0 0 XXX * 0:00 0 0 XXX * 0:00 0 5 XXX * 6:47 42 0 XXX * 0:00 0 0 XXX * 0:00 0 LA ALMORAIMA 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 2 1 5:55 70 0 0 0:00 0 LAS MINAS 2 2 3:07 26 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 LOS RODEOS 1 1 1:30 4 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 PLASENCIA DE CÁCERES 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 18 16 41:41 370 0 0 0:00 0 0 0 0:00 0 1 1 2:00 11 0 0 0:00 0 0 0 0:00 0 HUELMA 1 1 1:41 8 0 0 0:00 0 0 0 0:00 0 1 1 2:04 32 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 IBIAS 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 2 2 7:19 36 0 0 0:00 0 0 0 0:00 0 CARAVACA 1 1 2:35 16 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 PLASENCIA DEL MONTE 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 0 0 0:00 0 TOTAL KAMOV verano 5 XXX * 8:53 54 0 XXX * 0:00 0 0 XXX * 0:00 0 19 XXX * 43:45 402 0 XXX * 0:00 0 0 XXX * 0:00 0 3 XXX * 9:19 47 2 XXX * 5:55 70 0 XXX * 0:00 0 TOTAL 5 XXX * 8:53 54 0 XXX * 0:00 0 11 XXX * 10:42 27 56 XXX * 145:46 577 18 XXX * 18:51 48 0 XXX * 0:00 0 46 XXX * 86:56 239 3 XXX * 9:15 92 12 XXX * 92:39 228 PORTUGAL
- XXX No se puede totalizar el número de incendios atendidos ya que en un mismo incendio pueden haber intervenido medios de distintas bases
BASE NAVARRA EXTREMADURA CANARIAS ILLES BALEARS MADRID CEUTA CASTILLA Y LEÓN CASTILLA LA MANCHA Resumen de actuación de los medios del MAPA por comunidad autónoma (II). Aviones y helicópteros de extinción. Año 2018
INCENDIOS FORESTALES 01/01/2018 - 31/12/2018 AVANCE INFORMATIVO 33 Resumen de actuación de los medios del MAPA por comunidad autónoma. Helicópteros de transporte. Año 2018 Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas PINOFRANQUEADO 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 TABUYO DEL MONTE 0 0 0 0:00 0 0 0 0 0:00 0 1 1 9 2:33 15 0 0 0 0:00 0 0 0 0 0:00 0 1 1 9 5:34 24 TINEO 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 4 4 36 7:50 24 0 0 0 0:00 0 LAZA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 RUENTE 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 17 17 152 31:20 150 TOTAL BRIF-i 0 XXX * 0 0:00 0 0 XXX * 0 0:00 0 1 XXX * 9 2:33 15 0 XXX * 0 0:00 0 4 XXX * 36 7:50 24 18 XXX * 161 36:54 174 DAROCA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 CUENCA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 LA IGLESUELA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 PINOFRANQUEADO 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 LAZA 0 0 0 0:00 0 0 0 0 0:00 0 58 25 546 151:16 1.038 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 PUERTO EL PICO 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 TINEO 0 0 0 0:00 0 0 0 0 0:00 0 8 3 72 25:07 115 0 0 0 0:00 0 19 9 183 52:11 339 0 0 0 0:00 0 LUBIA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 TABUYO DEL MONTE 0 0 0 0:00 0 0 0 0 0:00 0 2 1 17 3:50 20 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 PUNTAGORDA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 TOTAL BRIF-A y B 0 XXX * 0 0:00 0 0 XXX * 0 0:00 0 68 XXX * 635 180:13 1.173 0 XXX * 0 0:00 0 19 XXX * 183 52:11 339 0 XXX * 0 0:00 0 TOTAL GENERAL 0 XXX * 0 0:00 0 0 XXX * 0 0:00 0 69 XXX * 644 182:46 1.188 0 XXX * 0 0:00 0 23 XXX * 219 60:01 363 18 XXX * 161 36:54 174 Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas PINOFRANQUEADO 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 2 2 17 6:00 26 0 0 0 0:00 0 TABUYO DEL MONTE 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 TINEO 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 LAZA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 RUENTE 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 TOTAL BRIF-i 0 XXX * 0 0:00 0 0 XXX * 0 0:00 0 0 XXX * 0 0:00 0 0 XXX * 0 0:00 0 2 XXX * 17 6:00 26 0 XXX * 0 0:00 0 DAROCA 0 0 0 0:00 0 0 0 0 0:00 0 6 1 54 29:26 133 2 1 18 3:36 10 0 0 0 0:00 0 0 0 0 0:00 0 CUENCA 0 0 0 0:00 0 0 0 0 0:00 0 6 1 48 35:16 135 0 0 0 0:00 0 2 1 18 3:45 17 0 0 0 0:00 0 LA IGLESUELA 0 0 0 0:00 0 0 0 0 0:00 0 6 1 54 27:56 94 0 0 0 0:00 0 8 4 68 20:31 131 0 0 0 0:00 0 PINOFRANQUEADO 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 LAZA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 PUERTO EL PICO 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 TINEO 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 LUBIA 0 0 0 0:00 0 0 0 0 0:00 0 2 1 16 15:34 17 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 TABUYO DEL MONTE 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 PUNTAGORDA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 4 2 17 5:20 35 TOTAL BRIF-A y B 0 XXX * 0 0:00 0 0 XXX * 0 0:00 0 20 XXX * 172 108:12 379 2 XXX * 18 3:36 10 10 XXX * 86 24:16 148 4 XXX * 17 5:20 35 TOTAL GENERAL 0 XXX * 0 0:00 0 0 XXX * 0 0:00 0 20 XXX * 172 108:12 379 2 XXX * 18 3:36 10 12 XXX * 103 30:16 174 4 XXX * 17 5:20 35 Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas Núm. Int. Núm. Inc. Brigadistas Horas Descargas PINOFRANQUEADO 0 0 0 0:00 0 9 9 60 19:25 148 0 0 0 0:00 0 0 0 0 0:00 0 1 1 9 1:34 10 12 12 86 26:59 184 TABUYO DEL MONTE 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 1 1 9 2:24 16 3 3 27 10:31 55 TINEO 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 4 4 36 7:50 24 LAZA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 1 1 9 2:46 18 1 1 9 2:46 18 RUENTE 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 17 17 152 31:20 150 TOTAL BRIF-i 0 XXX * 0 0:00 0 9 XXX * 60 19:25 148 0 XXX * 0 0:00 0 0 XXX * 0 0:00 0 3 XXX * 27 6:44 44 37 XXX * 310 79:26 431 DAROCA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 8 2 72 33:02 143 CUENCA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 8 2 66 39:01 152 LA IGLESUELA 0 0 0 0:00 0 2 1 15 5:30 32 0 0 0 0:00 0 0 0 0 0:00 0 6 3 54 24:01 200 22 9 191 77:58 457 PINOFRANQUEADO 0 0 0 0:00 0 38 17 255 105:31 803 0 0 0 0:00 0 0 0 0 0:00 2 1 17 4:21 16 40 18 272 109:52 819 LAZA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 58 25 546 151:16 1.038 PUERTO EL PICO 0 0 0 0:00 0 1 1 9 7:04 49 0 0 0 0:00 0 0 0 0 0:00 0 16 16 150 26:36 181 17 17 159 33:40 230 TINEO 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 27 12 255 77:18 454 LUBIA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 2 1 16 15:34 17 TABUYO DEL MONTE 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 12 6 93 35:17 191 14 7 110 39:07 211 PUNTAGORDA 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 0 0 0 0:00 0 4 2 17 5:20 35 TOTAL BRIF-A y B 0 XXX * 0 0:00 0 41 XXX * 279 118:05 884 0 XXX * 0 0:00 0 0 XXX * 0 0:00 0 36 XXX * 314 90:15 588 200 XXX * 1.704 582:08 3.556 TOTAL GENERAL 0 XXX * 0 0:00 0 50 XXX * 339 137:30 1.032 0 XXX * 0 0:00 0 0 XXX * 0 0:00 0 39 XXX * 341 96:59 632 237 XXX * 2.014 661:34 3.987 XXX * No se puede totalizar el número de incendios atendidos ya que en un mismo incendio pueden haber intervenido medios de distintas bases ILLES BALEARS MADRID CASTILLA Y LEÓN TOTAL NACIONAL BASE CANARIAS GALICIA ANDALUCÍA ASTURIAS CANTABRIA NAVARRA EXTREMADURA LA RIOJA MURCIA BASE PAÍS VASCO CATALUÑA C. VALENCIANA ARAGÓN CASTILLA LA MANCHA BASE
FD06128 | 2020_西班牙_MITECO_林火夏季战役通报_火灾报告.pdf
分类:06_境外及港澳台调查报告 | 年份:2020 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
Madrid, 21 de octubre de 2020 BRIEFING FINAL DE CAMPAÑA DE INCENDIOS FORESTALES 2020 Centro de Coordinación de la Información Nacional sobre Incendios Forestales (CCINIF) Subdirección General de Política Forestal y Lucha contra la Desertificación Dirección General de Biodiversidad, Bosques y Desertificación MINISTERIO PARA LA TRANSICIÓN ECOLÓGICA Y EL RETO DEMOGRÁFICO
El MITECO, en el marco de sus competencias, dispone de un Centro de Coordinación de la Información Nacional de Incendios Forestales (CCINIF), que: • Realiza la coordinación nacional en materias de extinción y prevención de incendios forestales. • Refuerza a las comunidades autónomas en la atención a los incendios forestales.
AVANCE INFORMATIVO. Datos generales del 1 enero al 15 de octubre de 2020
Se han producido 7.158 siniestros 4.750 han sido conatos (67%) 2.408 incendios (33%) Han sido afectadas 62.904,39 ha de superficie forestal Se han producido 17 Grandes Incendios AVANCE INFORMATIVO. Datos generales de 1 enero a 15 de octubre de 2020
Reducción del 30% en el total de siniestros (2º mejor año) Reducción del 33% del número de conatos (< 1 ha) Reducción del 30% del número de incendios (> 1ha) Reducción de la superficie forestal afectada en un 21% Se produce 1 GIF más que la media (17) COMPARACIÓN CON EL DECENIO (2010 - 2020)
SINIESTROS Y SUPERFICIES POR REGIONES, 1 enero a 15 de octubre de 2020 46,77% de los siniestros se producen en el Noroeste 46,96% de la superficie forestal se produce en el Noroeste 57,99% de la superficie arbolada se produce en el Mediterráneo
SINIESTROS Y SUPERFICIES POR REGIONES (2010 – 2020) Se produce un aumento de la superficie arbolada afectada en el Mediterráneo (57,99% frente a 34,07%), con número similar de siniestros respecto a la media Debido al gran incendio ocurrido en Huelva en 2020.
EVOLUCIÓN DE SINIESTROS de 1 de enero a 15 de octubre de 2010 a 2020 En el decenio, 2020 es el 2º año con menos siniestros
EVOLUCIÓN SUPERFICIES FORESTALES (2010 – 2020) En el decenio, 2020 es el 5º año con menos superficie
Término Municipal Fecha Superficie forestal (ha) Tineo (Asturias) 15-feb. 770,29 San Nicolás de Tolentino (Las Palmas de GC) 22-feb. 939,80 Tineo (Asturias) 23-feb. 566,18 Cualedro-San Millao (Orense) 29-jul. 1.010,00 Robledo de Chavela (Madrid) 2-ago. 1.073,06 Plasencia (Cáceres) 3-ago. 558,50 Gallegos del Rio (Zamora) 15-ago. 1.068,40 Garafia (SC Tenerife) 21-ago. 1.138,00 Almonaster la Real (Huelva) 27-ago. 12.101,35 Cabezuela del Valle (Cáceres) 27-ago. 4.118,78 Vilar de Barrio (Orense) 12-sep. 504,63 Cualedro-Montes (Orense) 13-sep. 1.300,00 Vilariño de Conso (Orense) 13-sep. 817,29 Lobios (Orense) 13-sep. 2.025,95 Chandrexa de Queixa (Orense) 13-sep. 705,74 Manzaneda (Orense) 14-sep. 810,52 A Mezquita (Orense) 14-sep. 524,91 GRANDES INCENDIOS FORESTALES EN 2020
17 grandes incendios forestales = 48% superficie forestal total afectada o Almonaster la Real (Huelva): 12.101 ha. MITECO movilizó 86 personas (76 de medios aéreos y 10 personal terrestre), realizando 232 horas de vuelo y 1.388 descargas de agua (6.465.200 litros). o Cabezuela del Valle (Cáceres): 4.119 ha. MITECO movilizó 788 personas (148 de medios aéreos y 640 personal terrestre), realizando 408 horas de vuelo y 1.846 descargas de agua (que suponen 4.471.100 litros) Los dos GIF han supuesto: 54% superficie forestal afectada por GIF en verano (30.033 ha) 26% superficie forestal afectada hasta el 11 de octubre de 2020 GRANDES INCENDIOS FORESTALES (GIF) EN 2020
Entre el 1 y el 17 de septiembre, en los incendios de Ourense, MITECO movilizó 1.578 efectivos (463 personal medios aéreos y 1.115 personal terrestres), realizando 672 horas de vuelo y 3.140 descargas (8.486.200 litros) Incendio de Garafía (La Palma, Canarias) MITECO movilizó 635 efectivos (91 personal medios aéreos y 544 personal terrestre), volando 213 horas y realizando 983 descargas (2.587.100 litros). Se movilizaron medios ubicados en las islas Canarias y otros de la Península (3 aviones anfibios de gran capacidad, 2 BRIF, 1 Helicóptero de gran capacidad y 1 Avión de Coordinación). GRANDES INCENDIOS FORESTALES (GIF) EN 2020
Durante la extinción del incendio de Muro (Mallorca), el 26 de agosto, se establecieron marcas de récord en número y frecuencia de descargas de agua por los aviones anfibios del MITECO: • Avión de Pollensa (Mallorca): 96 descargas, 1 cada 5 minutos • Avión procedente de Madrid: 69 descargas, 1 cada 4 minutos Los datos muestran la pericia de los tripulantes, así como la intensidad de trabajo y dedicación para proteger el Parque Natural de S’Albufera OTROS DATOS DE INTERÉS
En 134 días de campaña: INTERVENCIONES HORAS DE VUELO DESCARGAS LITROS DESCARGADOS TOTAL 1.410 3941 18.298 55.420.600 MEDIA DIARIA 11 29 137 413.587 PERSONAL MEDIOS AÉREOS PERSONAL MEDIOS TERRESTRES TOTAL 2.639 6.857 MEDIA DIARIA 20 51 Intervenciones conjuntas de varias BRIF: Garafía (La Palma, Canarias) – 3 BRIF Cabezuela del Valle (Cáceres Extremadura) - 6 BRIF INTERVENCIONES MEDIOS MITECO DURANTE LA CAMPAÑA
4 víctimas mortales relacionadas con los incendios forestales 2 ajenas a la extinción en los incendios de Los Arcos (Navarra) el 20 de mayo, y Castiblanco de los Arroyos (Sevilla) el 8 de octubre. 2 integrantes del dispositivo de extinción de Portugal, el comandante y copiloto del avión anfibio modelo CL-215 en el incendio fronterizo con Portugal en Lobios (Ourense) el día 8 de agosto. ACCIDENTES
• MITECO ha puesto en marcha un sistema de alerta temprana de incendios basado en inteligencia artificial Big-Data. Desarrollado junto con el MAPA • Predice semanalmente la ocurrencia de incendios y superficies • Utiliza datos de la serie histórica de incendios (EGIF) predicciones de AEMET • Los resultados alcanzan validaciones próximas al 80% • Utilizado para anticipar las regiones con mayor probabilidad de incendios, asignar recursos de vigilancia y extinción (MITECO y SEPRONA) SISTEMA DE ALERTA TEMPRANA DE INCENDIOS FORESTALES
Ejemplo de resultados de predicción semanal Comparativa ejemplo predicción- realidad
Creado en marzo de 2019 para reforzó y mejorar el Mecanismo Europeo de Protección Civil (UCPM) Es una nueva reserva de capacidades europeas que incluye una flota de aviones y helicópteros de extinción de incendios forestales.
España, colabora con el periodo de transición establecido hasta 2025 aportando en la campaña de 2019 y 2020, 2 aviones anfibios Canadair propiedad del Ministerio del 15 de junio al 31 de octubre. Los aviones están disponibles para apoyar a otros países siempre que no sean necesarios en España en base a la situación de incendios forestales y el riesgo previsto, determinada por el MITECO. Durante la campaña de 2020 no se ha producido ninguna activación
Activación del servicio de gestión de emergencias de Copernicus, de la Comisión Europea, a través de la DG de Protección Civil y Emergencias del Ministerio de Interior. Para obtención de información geoespacial en el incendio forestal de Cabezuela del Valle (Cáceres) el 28 de agosto, para obtener mapas de superficie afectada y grado de afección de la vegetación. El MITECO también coordina, en colaboración con la Dirección General de Protección Civil y Emergencias del Ministerio del Interior y las comunidades autónomas un equipo de técnicos expertos en evaluación y asesoramiento de incendios forestales (Forest fires Assessment and Advisory Team – FAST), para dar apoyo a aquellos países que lo soliciten, Durante este año 2020 no se ha producido hasta la fecha ninguna activación del equipo FAST.
Reducción por debajo de la media del decenio tanto de siniestros como de superficie afectada Alrededor del 70% de los siniestros han quedado en conatos (< 1 ha). BALANCE
2020 es el segundo con menor número de siniestros del decenio 2020 es el quinto año en cuanto a superficie afectada Elevada superficie del incendio de Almonaster la Real (Huelva) (> 12.000 ha), 20% de la superficie del año. Junto con el incendio de Cabezuela del Valle (Cáceres), suponen el 26% del total de la superficie Efectividad de los dispositivos
- condiciones meteorológicas menos
adversas (primavera lluviosa y fresca, verano sin olas de calor significativas) + menor movilidad de personas debida a la declaración del estado de alarma y los confinamientos decretados por la COVID-19. Impacto de la pandemia en el operativo No han afectado la operatividad del dispositivo (Reducción del personal de las BRIF a partir de septiembre) BALANCE
Tipo de Aeronaves Total AVIONES ANFIBIOS CL-215T / CL-415 (5.500/6.000 litros) 2 HELICÓPTEROS BOMBARDEROS KAMOV (4.500 litros) 5 BRIF CON HELICÓPTEROS MEDIOS DE TRANSPORTE DE BRIGADAS (1.200 litros) 5 BRIGADAS EN DISPONIBILIDAD 10 AVIONES DE COORDINACIÓN Y OBSERVACIÓN 1 Total 23
Tipo de Aeronaves Total BRIGADAS DE LABORES PREVENTIVAS (BLP) 10 EQUIPOS DE PREVENCIÓN INTEGRAL (EPRIF) 21 Total 31
OBJETIVO avanzar en la mejora una eficiente y segura colaboración y coordinación interadministrativa a nivel regional, nacional e internacional de los operativos.
PROGRAMA NACIONAL DE PREPARACIÓN EN INCENDIOS FORESTALES
Ejercicios conjuntos. Incendios que afectan a más de 1 CCAA que
requieren implementación del Mando Único de extinción (MUE),
Intercambio de expertos. Capitalizar las experiencias de las distintas administraciones, facilitar la interoperabilidad de los recursos y
avanzar en la implementación de estándares comunes.
Movilización del equipo de evaluación y asesoramiento en incendios forestales (FAST) en misiones y ejercicios tanto nacionales como internacionales.
Necesidad de seguir trabajando en mejorar las capacidades organizativas, interoperativas, técnicas y de anticipación. Heterogeneidad de nuestros territorios en lo que a incendios se refieren. Las acciones para evitar y reducir los incendios debe adaptarse a las realidades sociales y ecológicas que cada territorio. Existe alta capacidad operativa, pero es preciso reforzar la anticipación (prevención) para atender los GIF. Preparación y coordinación de los operativos, sistemas de alerta temprana y planificación estratégica de territorios con elevado riesgo, son elementos esenciales. CONCLUSIONES
El MITECO tiene una alta capacidad de movilización de recursos humanos y materiales, en atención a las necesidades de cada territorio. El MITECO lidera un equipo de expertos pionero en Europa y de altísima capacidad técnica y experiencia, disponible para apoyar a los territorios que lo necesiten. CONCLUSIONES
El Ministerio reconoce y agradece el trabajo continuo y profesional de los hombres y mujeres que trabajan en el territorio nacional dentro de todos los dispositivos para prevenir y extinguir los incendios forestales. El Ministerio agradece a los medios comunicación por el papel que ejercen como principal canal de información y sensibilización de la población, y pone a su disposición todas los recursos y colaboraciones posibles para que tengan una información directa, objetiva y en tiempo real.
FD06129 | 1990_港澳台_香港_擅离职守最终沦为囚徒_10·10_火灾_调查报告.md
分类:06_境外及港澳台调查报告 | 年份:1990 | 地域:香港 | 严重程度: | 场所: | 起火原因:电气 | 来源格式:md
一、事故概况及经过
1990年10月10日23点30分至次日7点30分,王某某、陈某在福州(香港)钮扣有限公司制扣车间当班,操作双古4号,单古1、2号三台制扣机。王某某上班后不久就看小说,嗣后又擅离生产岗位,去车间办公室睡觉。陈某上班后不久就离开生产岗位到传达室煮点心,并将点心端到吹膜车间吃,而后又在该车间睡觉。双古4号、单古1、2号三台机器实际上处于无人看管状态。10月11日凌晨一时许,双古4号制扣机主电机线路接头松动,产生接触电阻过大,发热并打出火花引燃机台底部易燃粉尘,未能及时发现以致不断蔓延,造成特大火灾事故,烧毁厂房1600平方米及绝大部分设备、成品、半成品等,直接经济损失达65万多元。车间班长王某某、临时工陈某的行为构成重大责任事故罪,分别判处王某某有期徒刑3年;陈某有期徒刑1年6个月。
二、事故原因及分析
1.违反规章制度。该公司劳动规牵制度试行条例第二章第三条:“职工在班时间不得酗酒,不准打毛衣,洗衣服,打磕睡,不准看与生产、工作无关的书籍,不准搞其他私活。”第四条:“职工当班期间,不得擅离生产、工作岗位,如由此造成的生产、设备事故或其他损失,由当事人负责”等规定。王某某、陈某上班后不久,擅离生产岗位,去做与生产无关的事情。违反了该公司的劳动规章制度。
2.不尽职责。当班期间擅离职守,看小说、打盹睡觉。特别严重的是二人在双古4号机发火成灾后才赶到现场,使大火已无法扑救,是造成事故的主要原因。
三、防止同类事故的措施
1.加强思想教育。我党我国历来重视安全生产工作,提出了“安全第一、预防为主”的方针,要想把这一方针真正落实,就得针对本单位的事故苗头不断的进行思想教育,克服麻痹思想,是安全工作时时、处处都要真正落到实处。
2.加强督促检查。规章制度制定出来以后,各级领导、安全职能部门要不断的督促检查落实,发现问题及时采取措施,防患于未然。领导制定出措施,不负责检查落实,也是一种失职行为,情节严重的也要追究法律责任 。
FD06130 | 1990_港澳台_香港_擅离职守沦为囚徒_10·10_火灾_调查报告.md
分类:06_境外及港澳台调查报告 | 年份:1990 | 地域:香港 | 严重程度: | 场所: | 起火原因:电气 | 来源格式:md
一、事故概况及经过
1990年10月10日23点30分至次日7点30分,王某某、陈某在福州(香港)钮扣有限公司制扣车间当班,操作双古4号,单古1、2号三台制扣机。王某某上班后不久就看小说,嗣后又擅离生产岗位,去车间办公室睡觉。陈某上班后不久就离开生产岗位到传达室煮点心,并将点心端到吹膜车间吃,而后又在该车间睡觉。双古4号、单古1、2号三台机器实际上处于无人看管状态。10月11日凌晨一时许,双古4号制扣机主电机线路接头松动,产生接触电阻过大,发热并打出火花引燃机台底部易燃粉尘,未能及时发现以致不断蔓延,造成特大火灾事故,烧毁厂房1600平方米及绝大部分设备、成品、半成品等,直接经济损失达65万多元。车间班长王某某、临时工陈某的行为构成重大责任事故罪,分别判处王某某有期徒刑3年;陈某有期徒刑1年6个月。
二、事故原因及分析
1.违反规章制度。该公司劳动规牵制度试行条例第二章第三条:“职工在班时间不得酗酒,不准打毛衣,洗衣服,打磕睡,不准看与生产、工作无关的书籍,不准搞其他私活。”第四条:“职工当班期间,不得擅离生产、工作岗位,如由此造成的生产、设备事故或其他损失,由当事人负责”等规定。王某某、陈某上班后不久,擅离生产岗位,去做与生产无关的事情。违反了该公司的劳动规章制度。
2.不尽职责。当班期间擅离职守,看小说、打盹睡觉。特别严重的是二人在双古4号机发火成灾后才赶到现场,使大火已无法扑救,是造成事故的主要原因。
三、防止同类事故的措施
1.加强思想教育。我党我国历来重视安全生产工作,提出了“安全第一、预防为主”的方针,要想把这一方针真正落实,就得针对本单位的事故苗头不断的进行思想教育,克服麻痹思想,是安全工作时时、处处都要真正落到实处。
2.加强督促检查。规章制度制定出来以后,各级领导、安全职能部门要不断的督促检查落实,发现问题及时采取措施,防患于未然。领导制定出措施,不负责检查落实,也是一种失职行为,情节严重的也要追究法律责任。
FD06131 | 1995_台湾_台中衛爾康西餐廳大火_監察院糾正彈劾案文.pdf
分类:06_境外及港澳台调查报告 | 年份:1995 | 地域:台湾 | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
監察檔案展特輯 中華民國精彩100
監察檔案展特輯 中華民國精彩100
「檔案」,是全民共同的珍貴資產、是政府處理公務的 紀錄,是政府職權行使的足跡,也是政府施政作為的第一手 資料。因此,「檔案」的妥適保存與管理意義非凡,體察21 世紀的浪潮中,「資訊公開」是一股不可拂逆的趨勢,檔案 開放應用就是政府資訊公開的具體示範,而檔案展的舉辦, 更是檔案加值應用的實踐。欣逢中華民國建國100,監察院 藉由這次監察檔案展的舉辦,呈現了監察制度建置的足跡, 除了回顧歷史,更期使民眾瞭解監察院這些年來的努力,進 而策勵未來。 我國監察制度始於秦、漢,迄今已有兩千年歷史,是我 國珍貴的歷史資產。中華民國監察院自民國20 年正式成立 至今,為政府之最高監察機關,行使彈劾、糾舉、糾正、調 查及審計等職權,致力於整飭官箴、澄清吏治、紓解民怨及 保障人權。然而,監察院設立之功能、職權、工作職掌與績 效成果卻鮮為人知,幸賴監察檔案忠實記錄了監察權行使的 軌跡,藉由檔案的呈現,得以留下印記,還原歷史長河的流 變。 這次展覽依「歷史回顧」、「職權行使」、「傳承創新」 三大展覽主題佈展,以檔案、文物及出版品為媒材,運用多 院長序
媒體設備及互動特效與播放系統,以多元化方式呈現展品之豐富面貌。這 次展覽贏得各界熱烈的迴響,為使展覽之記憶得以留存,並使因時空阻隔 無緣來監察院參觀的民眾得以略窺本展之面貌,爰有本特輯之出版計畫。 這次展覽得以順利舉辦,感謝國立故宮博物院提供12 件清朝御史巡 察臺灣相關奏摺複製品、國史館及檔案管理局提供珍貴的歷史檔案頁面, 公視、華視及客家電視臺提供珍貴的新聞報導影片等,及監察院同仁為這 次展覽所做的努力。 在有限經費下,首次舉辦監察檔案展,並能獲得廣大迴響,是我們所 樂見的,希望本特輯的出版,得以呼應許多社會賢達等諸多保存本展覽記 憶的建議,並使監察院成立以來首次檔案展覽「有案可查」! 監察院院長 謹誌 中華民國100 年8 月
中華民國精彩100 監察檔案展特輯 中華民國精彩100-監察檔 一、緣起 國父創建民國,兼融西方及中國政制之長,提出五權憲法,其中監察權 為我國傳統政治文化之精髓,從君權邁向民權的過程中,監察權扮演了關鍵 性的重要角色。 為慶祝中華民國建國100 年,監察院於民國100 年3 月16 日至4 月 15 日舉辦「中華民國精彩100—監察檔案展」,首度公開展出100 件重要 監察檔案、史料及文物,回眸先賢足跡,省思瞻望未來。 二、籌展過程 此次展覽,由監察院副秘書長許海泉擔任召集人,與相關單位主管組成 籌展工作小組,密集開會討論檔案審選之原則、重點,並進行說明文稿之審 查。 為豐富展 出內容,除監 察院自行典藏 之案卷,特別 協調國立故 宮博物院提 供12 件與行 使監察權相關 之清代宮廷奏 導覽人員為參觀學生解說監察院之播遷及職權行使年表等內容
花 絮 案展花絮 摺,並向國史館及檔案管理局借展國民政府時期之監察檔案及部分已移轉之案卷,以 拉長歷史軸線的縱深。 為展現檔案之時代意義,呈現方式揚棄純靜態的平面文字輸出,將整體展區分為 「歷史回顧」、「職權行使」、「傳承創新」三大主題區,以展板搭配複製案卷、數 位相框,並結合現代數位科技,設計電視牆及電子書,介紹監察權的歷史足跡。「歷 史回顧」主題區以「我國監察權行使年表」反應我國監察權之演變、「監察院播遷史」 描繪監察院院址遷移的歷史,生動呈現我國監察權歷經軍政、訓政、憲政時期之機關 組織與制度等重要變革。 「職權行使」主題 區介紹監察院歷屆重要 之彈劾、糾正、糾舉等 相關個案,如江國慶涉 空軍總司令部女童命案 平反案、拉法葉艦案, 醫療人球事件、大園空 難事件等,並設置「明 鏡陽光特展」專區,展 示監察院陽光四法之執 行成果。 「傳承創新」主題區展示的清朝宮廷奏摺、監察院印信3D 影像等文物象徵傳承; 介紹檔案儲存載體形式與儲存媒體之演變,從早期的膠片、磁性材料到現代的磁性載 體與光碟檔案,象徵對未來的展望。被尊稱為監察之父—前院長于右任的墨寶及珍貴 法國拉法葉巡防艦
中華民國精彩100 監察檔案展特輯 的老照片,也在展覽中與監察院古蹟文史檔案紀錄一併呈現於國人眼前,增 添豐富的人文風華與歷史風情。 三、活動采風 檔案展在 3 月16 日舉 行開幕式,串 連愛心音樂 會,形塑豐富 的視、聽覺饗 宴。開幕儀式 以舞獅活動揭 開序幕,小提 琴現場演奏烘 監察院前院長于右任之墨寶 考試院長關中參加監察檔案展開幕儀式後,由監察院長王建煊陪同 前往展覽區,觀看重要歷史檔案
花 絮 托文化藝術氛圍,考試院院長關中率考試委員、國立故宮博物院院長周功鑫及各界貴 賓出席踴躍,共襄盛舉。 總計1 個月的展出期間,超過5,000 位各界貴賓及民眾湧入監察院參觀。參觀者 皆對可供自由翻閱的複製檔案深感興趣,並對監察院首次舉辦之檔案展表示肯定,認 有助其更瞭解我國監察權發展的歷史與成果,並對監察院及監察權行使有更深一層認 識,希望未來能多舉辦類似展覽。 四、結語 此次監察檔案展為監察院首次舉辦之大型檔案展覽,期使民眾更瞭解監察院自成 立以來,各屆委員與全體同仁默默付出,鞠躬盡瘁以發揚監察權安定國家社會之功能。 欣逢舉國歡騰的中華民國百歲誕辰,不僅從檔案中回眸監察歷史、從檔案中洞察監察 權的軌跡、更從檔案中展望、開創監察新紀元。
8 目次 壹 歷史回顧 12 一、監察院組織法沿革 14 二、行憲前監察院之職權-非常時期監察權行使暫行辦法 20 三、國民政府時期彈劾法之制定 24 四、監察委員產生方式之變革 28 五、監察院三年半空窗期之運作 32 六、同意權行使演遞 36 七、彈劾、糾舉、監試權之源流 38 貳 職權行使 42 一、前副總統李宗仁彈劾案 44 二、前行政院長汪兆銘( 汪精衛) 彈劾案 48 三、前行政院長俞鴻鈞彈劾案 56 四、孫立人將軍與臺灣南部地區涉嫌陰謀叛亂事件之關係案 58 五、蘇炳坤被誣指強盜案,監察院三次函請檢察總長研提非常上訴 64 六、公務員懲戒委員會黃金瑞彈劾案 70 七、檢察總長陳聰明彈劾案 72 八、前臺東縣長黃式鴻等人縱惡擾民串同構誣糾舉案 74
9 九、臺中市「衛爾康」西餐廳火災事件 76 十、嚴重急性呼吸道症候群(SARS)疫情之失控 80 十一、邱小妹醫療人球事件 82 十二、二二八事件 86 十三、拉法葉艦軍購案 90 十四、多氯聯苯中毒案 94 十五、林肯大郡崩塌案 96 十六、大園空難事件 98 十七、臺大校園陳文成命案 100 十八、江國慶涉空軍總司令部女童命案 108 參 傳承創新 112 一、我國監察權的傳承與創新 114 ◎君權時期 114 ◎民國肇建時期 114 ◎現代監察院-人權院 114 二、與國際接軌 118 三、從檔案看文字書寫工具之演變 128
10 目次 四、調查證之創制與演進 134 五、檔案之典藏 144 ◎檔案形式 144 ◎典藏媒體 144 六、機關檔案管理金檔獎簡介 146 七、檔案應用(保存與調閱)之創新 148 八、百年古蹟、世紀風華 156 九、時光隧道裡的歷史烙印 158 十、新古典巴洛克交融、大器風格 162 十一、遠觀美、近觀更美 168 十二、躡足貓道、別有洞天 170 十三、還我紅顏、再現古蹟芬芳 172 十四、清朝監察文書-奏摺 176 十五、監察之父于右任 186
11
壹 》 歷史回顧
一、監察院組織法沿革 二、行憲前監察院之職權-非常時期監察權行使暫行辦法 三、國民政府時期彈劾法之制定 四、監察委員產生方式之變革 五、監察院三年半空窗期之運作 六、同意權行使演遞 七、彈劾、糾舉、監試權之源流
14 中華民國精彩100 監察檔案展特輯 監察院組織法沿革 檔號:1242/001012071A389(卷號) 36 年4 月1 日出版「國民政府公報」第2787 期 (81)監台院字第2339 號(收文號) (81)監台院字第2340 號(收文號) 0870100269 號(收文號)/ 0990107155 號(收文號) 軍政時期 國父孫中山先生擷取歐美之行政、立法、司法三權分立制度外,另增監 察權及考試權。 民國初年,北洋政府設平政院,下設肅政廳,職司察理官吏之違法不當 行為及糾彈官吏職權。 民國14 年7 月17 日國民政府首度公布監察院組織法,同年8 月1 日 試設監察院,為國民政府試行監察權之始。16 年11 月5 日國民政府第3 次 公布修正監察院組織法。此為軍政時期監察院組織法制定之始由。 訓政時期 民國17 年10 月中華民國國民政府組織法公布施行,行政、立法、司法、 監察及考試五院院長宣誓就任,五院體制之國民政府正式成立。 同年月再度公布監察院組織法,展開籌備工作,20 年2 月監察院正式 成立。 民國25 年4 月14 日依據監察院組織法制定公布監察使署組織條例, 據以設置監察區,貫徹行使分區監察職權。
15 壹、歷史回顧 憲政時期 民國36 年1 月1 日公布中華民國憲法,3 月31 日公布監察院組織法。37 年6 月 正式成立行憲後首屆監察院。 民國57 年7 月2 日修正監察院組織法,設秘書處。並於60 年至64 年間配合業 務所需,調整員額及職務列等。 民國81 年11 月4 日修正公布監察院組織法第6、9、15 條,並增列第3 條之1, 乃係配合中華民國憲法增修條文,監察委員之產生由選舉制改為總統提名經國民大會 同意任命,第一屆監察委員據此產生,並於82 年2 月1 日宣誓就職,監察院邁入行憲 後第2 階段。 民國87 年1 月7 日修正監察院組織法,設監察業務處、監察調查處、公職人員財 產申報處,並增置監察調查人員。嗣89 年4 月25 日憲法增修條文第7 條修正公布, 監察院院長、副院長、監察委員改由總統提名並「經立法院同意」任命之,乃配合修 正監察院組織法第6 條。第四屆監察委員於97 年8 月1 日宣誓就職。
16 中華民國精彩100 監察檔案展特輯 (資料來源:國史館)
17 壹、歷史回顧 (資料來源:國史館)
18 中華民國精彩100 監察檔案展特輯 (資料來源:國史館)
19 壹、歷史回顧 (資料來源:國史館)
20 中華民國精彩100 監察檔案展特輯 檔號: 200000000A/0120.50/7830.01-03 (檔案經總統府於50 年8 月15 日移轉國史館) 國民政府組織法第40 條規定:「監察院為國民政府最高監察機關,依 法行使彈劾、審計權」。 抗戰時期,為應付戰時特殊需求,以濟監察法規之不足,俾監察權行使 手續、效果,趨於簡捷,爰於26 年12 月17 日頒布「非常時期監察權行使 暫行辦法」及其施行細則。依是項辦法,行使建議、糾舉職權,俾事前監察 與事後監察相互為用。 依修正監試法第1 條規定:監察院於歷次考試,均應推派監察委員或監 察使前往監試。此外,監察委員為明瞭中央及地方政府施政情形,並至各地 視察及巡察,俾監察職權之行使,積極有效。 綜括而言,行憲前監察院之職權計有彈劾、審計、糾舉、建議、監試、 視察(調查)及巡察權。 行憲前監察院之職權-非常時
21 壹、歷史回顧 期監察權行使暫行辦法 (資料來源:國史館)
22 中華民國精彩100 監察檔案展特輯 (資料來源:國史館)
23 壹、歷史回顧 (資料來源:國史館)
24 中華民國精彩100 監察檔案展特輯 國民政府時期彈劾法之制定 檔號:200000000A/0120.50/7830.01-01 (檔案經總統府於50 年8 月15 日移轉國史館) 訓政綱領公布後,國民政府之軍政時期雖告結束,惟各地尚未完全平 定,監察院未正式成立,僅由中央依法選任正、副院長進行籌備。籌備期間 (17 年10 月至20 年1 月)設立設計委員會,主要任務為監察法規之草擬 及監察制度之研究。 此期間所起草之法規,經通過公布者,有彈劾法、監察院組織法第13 條修正案、審計部組織法、監察委員保障法等4 種。其中,彈劾法於18 年 5 月24 日經國民政府公布並通飭施行,就監察法制之創制而言,意義重大。
25 壹、歷史回顧 (資料來源:國史館)
26 中華民國精彩100 監察檔案展特輯 (資料來源:國史館)
27 壹、歷史回顧 (資料來源:國史館)
28 中華民國精彩100 監察檔案展特輯 監察委員產生方式之變革 檔號:200000000A/0180/7830.01-01 有關監察委員之產生方式,於軍政、訓政時期,歷經數度之變革。 行憲後,依憲法第91 條規定,監察委員「由各省市議會、蒙古西藏地 方議會及華僑團體選舉之」。民國81 年修憲,於增修條文第15 條第2 項 改為「由總統提名,經國民大會同意任命」。民國 89 年 4 月 25 日憲法增 修條文第7 條第2 項復改為現行「由總統提名,經立法院同意任命」。 時 期 監察委員產生方式 依 據 軍政 入於 訓政 時期 17.10.08 公布中華民國國 民政府組織法 由監察院院長提請國民政府任命 之 第43 條 訓政 時期 20.6.15 公布中華民國國 民政府組織法 國民政府主席提請國民政府依法 任免之 第47 條 20.12.30 修正公布中華民 國國民政府組織法 由監察院院長提請國民政府主席 依法任命之 第48 條 21.3.15 修正公布中華民 國國民政府組織法 由監察院院長提請國民政府主席 依法任免之 第48 條 憲政 時期 36 年公布憲法 由各省市議會、蒙古西藏地方議 會及華僑團體選舉之 第91 條 81 年憲法增修條文 由總統提名,經國民大會同意任 命之 增修條文第 15 條第2 項 89 年憲法增修條文 由總統提名,經立法院同意任命 之 增修條文第7 條第2 項
29 壹、歷史回顧 (資料來源:國史館)
30 中華民國精彩100 監察檔案展特輯 (資料來源:國史館)
31 壹、歷史回顧 (資料來源:國史館)
32 中華民國精彩100 監察檔案展特輯 監察院三年半空窗期之運作 檔號:09401151200158 93 年底,前總統陳水扁提名之第四屆監察院正、副院長與監察委員人 選因立法院未行使同意權,致94 年2 月1 日至97 年7 月31 日期間監察院 業務無法正常運作。此一期間,因內控失靈,外控機制喪失,政府相關機關 肆意而為,社會重大弊案接連發生,人民權利得不到應有保障,國家形象受 創。 監察院在此一期間,由秘書長杜善良帶領行政人員,於業務權限範圍內 推動各項業務,持續維繫院務運行。 司法院大法官嗣於釋字第632 號解釋中認定:立法院不將此案排入議 事程序已經牴觸憲法,要求該院進行適當處理。幾經波折,第四屆監察委員 終於97 年8 月1 日宣誓就職,結束長達3 年半的憲政空窗期。此期間之行 政作業模式被稱為「監察院模式」。
33 壹、歷史回顧
34 中華民國精彩100 監察檔案展特輯
35 壹、歷史回顧
36 中華民國精彩100 監察檔案展特輯 同意權行使演遞 同意權係國會監督權之一種,監察院於國會時期(民國82 年2 月1 日 以前),依據憲法規定行使人事同意權,其目的在於防止政府措施之不當或 任命權之濫用,代表人民行使行政監督權。 依據我國憲法規定,司法院院長、副院長、大法官、考試院院長、副院 長及考試委員人選,由總統提名,經監察院同意任命之。爰此,監察院為行 使同意權,訂定有監察院同意權行使辦法規定,就被提名人各項學經歷等資 料,召開審查會議,提報院會,由出席委員過半數採無記名投票方式同意決 定之。惟至民國81 年憲法增修條文將監察院同意權取消,自此監察院不再 行使同意權。 監察院自民國37 年起至民國81 年止,總計行使33 次同意權。行使對 象有,司法院院長6 人、副院長9 人、大法官100 人;考試院院長9 人、 副院長11 人、考試委員152 人。 第八屆考試院院長、副院長、考試委員就職典禮合影留念
37 壹、歷史回顧 民國81 年前,監察院依據憲法規定 行使人事同意權;於81 年修憲後, 同意權即遭取消 第五屆司法院全體大法官與司法院 院長黃少谷合影留念
38 中華民國精彩100 監察檔案展特輯 彈劾、糾舉、監試權之源流 彈劾權 西方彈劾權起源於中世紀時期之英國。1936 年起,英國平民院將違法 失職的大臣彈劾,送交貴族院懲處。 我國彈劾權制度係承襲自孫中山先生「五權憲法」之政治思想架構,由 「監察權獨立」之理論而來,其「一則淵源於吾國古代御史單獨行使監察權 之精神,一則對當時各國彈劾權之修正。」並言「彈劾權即監察權」。由此 推知,我國現行憲政體制下之彈劾權,源自上述3 種理論-歐美民主政治、 中國君主政治與孫中山理念下的彈劾權。 民國成立,廢除舊制,北京政府時代於平政院下設肅政廳,專司監察官 吏。迨北伐成功國民政府時代,設置監察院,職司彈劾官吏。 糾舉權 監察院於民國20 年成立時,未規定糾舉權,迨民國26 年12 月公布「非 常時期監察權行使暫行辦法及其施行細則」,爰創設「糾舉權」及「建議權」 (糾正權之前身)。其目的是為應付非常事變,以期監察的手續簡便,監察 目的得以充分和迅速的達成。 訓政時期特殊時空背景下適用頻繁情形,自民國27 年至36 年共提出 糾舉案1,174 案2,128 人,主要原因係抗戰期間及勝利後,政治未趨安定, 違法失職案件亟應加以迅速處理,故糾舉權之行使大為增加,充分發揮糾舉 權簡捷效率,爭取時間,制裁違失之特質,故沿用未廢。
39 壹、歷史回顧 監試權 查御史監試,漢史未有記載,依<舊唐書>,唐宣宗大中9 年,吏部試宏詞舉 人,洩漏試題,為御史臺所彈劾,侍郎裴諗降為國子祭酒,考試官侍郎唐枝出為處州 刺史,監察御史馮顓罰1 月俸料,足證唐朝考試是由御史監試。<明史選舉志>載:「會 試,禮部官監試2人,在內御史,在外按察司官。會試,御史供給收掌試卷;彌封、謄錄、 對讀、受卷及巡綽監門,搜檢懷挾,俱有定員,各執其事」。 監試法於民國19 年11 月25 日制定公布,依39 年10 月26 日修正之監試法 第1 條規定:「政府舉行考試時,除檢覈外,應由考試院或考選機關分請監察院或監 察委員行署派員監試……。」雖民國82 年2 月起,監察院已非民意機關,然依司法院 大法官會議釋字第325 號解釋,憲法之五院體制並未改變,監察院除同意權外,原屬 本院之職權,仍由監察院行使。
40 中華民國精彩100 監察檔案展特輯 國家考試工作流程 工 作 階 段 工 作 流 程 考試公告前之考選工作 考選部報請考試院決定舉辦考試 考選部公告舉辦考試 典 試 、 監 試 、 試 務 工 作 典試工作 監試工作 試務工作 成立典( 主) 試委員會 召開典( 主) 試委員會 第1 次會議 命題 考試 閱卷及處理試題疑義 召開典( 主) 試委員會 第2 次會議 放榜 輪派監試人員 監視試卷之彌封 監視彌封姓名冊固封保管 監視試題之繕印、封存及 分發 監視試卷點封 監視典( 主) 試委員會 第2 次會議辦理應考人考 試成績之審查 監視彌封姓名冊之開拆及 對號 監視及格人員榜示及公布 成立試務處 受理報名及審查 安排試場、寄發入場證、 製作試卷及彌封姓名冊 固封保管彌封姓名冊 入闈繕印試題 監場及點封考畢試卷 閱卷、受理試題疑義、登 算考試成績 開拆彌封姓名冊及對號 放榜及寄發成績單 考試辦理 完畢後之 考選工作 複查考試成績 呈報辦理考試經過及關係文件 請領考試及格證書
41 壹、歷史回顧
貳 》 職權行使 一、前副總統李宗仁彈劾案 二、前行政院長汪兆銘( 汪精衛) 彈劾案 三、前行政院長俞鴻鈞彈劾案 四、孫立人將軍與臺灣南部地區涉嫌陰謀叛亂事 件之關係案 五、蘇炳坤被誣指強盜案,監察院三次函請檢察 總長研提非常上訴 六、公務員懲戒委員會黃金瑞彈劾案 七、檢察總長陳聰明彈劾案 八、前臺東縣長黃式鴻等人縱惡擾民串同構誣糾 舉案
1-1 監察組織法沿革( 軍政、訓政、憲政) 1-2 非常時期監察權行使辦法 1-3 國民政府時期彈劾之法制定 1-4 監察委員產生方式之變革 1-5 監察院三年半空窗期之運作 1-6 同意權行使演遞 1-7 彈劾、糾舉、監試權之源流 九、臺中市「衛爾康」西餐廳火災事件 十、嚴重急性呼吸道症候群(SARS)疫情之失控 十一、邱小妹醫療人球事件 十二、二二八事件 十三、拉法葉艦軍購案 十四、多氯聯苯中毒案 十五、林肯大郡崩塌案 十六、大園空難事件 十七、臺大校園陳文成命案 十八、江國慶涉空軍總司令部女童命案
44 中華民國精彩100 監察檔案展特輯 前副總統李宗仁彈劾案 檔號:04102001200010 前副總統李宗仁前於代行總統職權期間,當38 年11 月國共內戰正熾, 西南軍事緊急之際,遽離國土。始而寄跡香港,旋即不顧輿論指責,與各方 勸阻,稱病赴美,棄職遠走,希圖自全。復於代總統名義解除後,在外國擅 發命令,顯係違法失職。至其公開聲明,擬恢復中國合作政府計畫,不久即 可宣布此計畫,並非完全依賴武力,顯有顛覆政府,危害國家之意圖。實觸 犯刑法第100 條之罪刑,爰依法提案彈劾。其觸犯刑法部分,依監察法第 15 條之規定,逕送司法機關依法辦理。
45 貳、職權行使
46 中華民國精彩100 監察檔案展特輯
47 貳、職權行使
48 中華民國精彩100 監察檔案展特輯 前行政院長汪兆銘(汪精衛) 監察院民國21 年彈劾行政院長汪兆銘( 汪精衛),為對日抗戰前較為受 矚目之個案。 監察院彈劾汪兆銘案緣於民國21 年上海一二八事變發生後,行政院長 汪兆銘未經立法院議決而逕行簽字,與日本締結上海停戰協定。 停戰協定屬於重要國際事項,依國民政府組織法第27 條規定必須先經 立法院議決。當時行政院、外交部雖係經中央政治會議許可而簽訂該協定, 並於締結該停戰協定後向立法院報告,監察院前院長于右任堅持任何重大法 案應先送立法院審議,為維護法制,監察院以行為違法而對行政院長汪兆銘 進行彈劾。汪氏以辭職要挾,監察院依法移送該案於中央監察委員會議時竟 得「應無庸議」之訓令,于前院長乃立即請辭,以示抗議。
49 貳、職權行使 彈劾案
50 中華民國精彩100 監察檔案展特輯
51 貳、職權行使
52 中華民國精彩100 監察檔案展特輯
53 貳、職權行使
54 中華民國精彩100 監察檔案展特輯
55 貳、職權行使
56 中華民國精彩100 監察檔案展特輯 前行政院院長俞鴻鈞彈劾案 檔號:04602001200010 監察院監督文武百官,官位大小則非所問;監察院彈劾行政院長俞鴻鈞 即為實例。 民國45 年12 月4 日監察院財政委員會以行政院美援運用委員會人員 待遇,較一般公務人員高出約5 倍,向行政院提出糾正案,行政院於逾期 90 日後,以減少待遇足以影響工作情緒,引致職員離職為由,拒絕監察院 之糾正案。 院會隨後就軍公教待遇調整問題,另於民國46 年3 月向行政院提出杜 絕浪費調整待遇之糾正案,惟行政院於逾期49 日後始答復,且未能為適當 之改善及處置;鑒於再糾正案仍無適當結果,而本案性質嚴重,乃依法通知 行政院院長俞鴻鈞到院質問,並因俞鴻鈞處理本案涉及違法失職,委員會行 使調查權指定到院接受查詢,然俞院長拒絕來院,監察院乃以行政院長未能 妥適處理糾正案等事由提出彈劾案,並經公務員懲戒委員會議決行政院長俞 鴻鈞予以申誡。
57 貳、職權行使
58 中華民國精彩100 監察檔案展特輯 孫立人將軍與臺灣南部地區 檔號:04403210000001 一般民眾印象中,監察院對失職官員會提出彈劾、糾舉,對於政策、設 施不當,會提出糾正,但別忘了,監察院除了糾彈不法官員外,也扮演為當 事人申冤的角色。 民國44 年6 月陸軍步兵軍官郭廷亮、江雲錦等人被指控涉嫌叛亂,曾 為郭廷亮長官之總統府參軍長孫立人,於同年8 月3 日引咎辭職,8 月20 日蔣總統批准辭呈並命令副總統兼行政院長陳誠等9 人組成調查委員會。9 人小組調查指出,郭廷亮等人承認密謀兵變,而孫立人未適當防範,有失察 之責。 坊間盛傳孫立人涉及「流產兵變」,牽連多人,他因而遭軟禁,但實際 真相如何?官方並未對外說明。 案經監察院當時的余俊賢、曹啟文、陶百川、蕭一山、王枕華等5 名調 查委員調查後,將「孫立人將軍與南部陰謀事件關係案」調查報告呈當時之 總統蔣中正先生,並呼籲罪疑惟輕、從寬處理,「令飭軍法局務須依證據以 認定事實,本事實以適用法條,不使一人含冤」,「並請特派態度公正、法 律精通之文職人員協助覆核,期無枉縱」。惟因調查報告未公布,外界對案 情不得而知,監察院後於90 年1 月9 日公布原調查報告,證明孫立人無叛 亂意圖,冤情獲平反。
59 貳、職權行使 涉嫌陰謀叛亂事件之關係案
60 中華民國精彩100 監察檔案展特輯
61 貳、職權行使
62 中華民國精彩100 監察檔案展特輯
63 貳、職權行使
64 中華民國精彩100 監察檔案展特輯 蘇炳坤被誣指強盜案,監察院 檔號:09003260000043 一、案發事實: 民國75 年3 月,有2 位頭戴面罩歹徒侵入金瑞珍銀樓行搶,並用菜刀 砍傷店東陳榮輝頭部,搶走手鐲、項鍊等金飾共87 件,重32.79 兩。警方 偵辦近3 月,毫無線索。 同年6 月18 日夜間,郭中雄行竊另一銀樓未遂,遭新竹市第一分局刑 警逮捕,懷疑金瑞珍銀樓搶案為其所為,經偵訊3 次,郭嫌供稱與蘇炳坤共 同行竊金瑞珍銀樓,新竹市警察一分局即率員到蘇炳坤住處,逕行拘提並搜 索,惟未發現任何贓物。 雖蘇炳坤始終否認犯罪,惟該分局取得郭中雄自白,以渠與蘇炳坤共同 搶劫金瑞珍銀樓及殺害店東陳榮輝未遂等罪嫌,將2 人解送新竹地檢署偵 辦。案經檢察官提起公訴(75 年度偵字第207 號),新竹地院就蘇炳坤、郭 中雄共同搶劫,而故意殺人未遂部分,認定郭中雄在警局自白與事實不符, 判決無罪(75 年度重訴字第381 號)。檢察官不服,提起上訴,臺灣高等法 院認定郭中雄在警局自白與事實相符,各判處蘇炳坤、郭中雄有期徒刑15 年(75 年度上重一訴字第355 號)。蘇炳坤、郭中雄不服,提起上訴,經最 高法院判決駁回而確定(76 年度台上字第1660 號)。 二、處理經過 本案事涉基本人權之保障,雖先後經監察委員於民國76 年11 月、民 國78 年5 月、民國82 年8 月、民國87 年3 月共4 次調查,且先後3 次建 議最高法院檢察署檢察總長提起非常上訴。其間,最高法院檢察署檢察總長
65 貳、職權行使 三次函請檢察總長研提非常上訴 「破天荒」提起4 次非常上訴,皆遭最高法院判決駁回。迄監察院第三屆委員於民國 89 年2 月24 日再次自動調查,創下監察院請求救濟次數最多之紀錄。 三、產生之效果與影響 ( 一)監察院基於政府長期關注人權問題,行政院復曾依赦免法第6 條就各界認 有冤情之蘇案、工運人士曾茂興案及錫安山等教徒拒服兵役等3 案,研議特 赦;又本案於認罪科刑顯有重大瑕疵,爰於完成調查報告後,函請行政院轉 呈 總統斟酌可否將其罪刑宣告無效,以確保人權,並表彰公義。 行政院隨於89 年12 月7 日函請總統府秘書長轉呈 總統參考,嗣奉 總統 89 年12 月10 日華總一義字第8900296190 號令:「依憲法第40 條及赦免 法第3 條後段之規定,特赦蘇炳坤,其罪刑之宣告為無效。」行政院即於同 日轉請法務部迅依法定程序辦理,該部並於同日完成赦免程序。 ( 二)經函請警政署依監察院調查意見檢討警察機關之違失,包括就犯罪嫌疑人偵 訊程序、指認作業程序,確實檢討改善。 有關「偵訊程序」,該署已針對缺失,修正相關作業規定,訂定專業警察常 用勤( 業) 務執行程序,全力推動各警察機關品質管理系統建置工作,加強教 育員警,並視經費狀況,逐年編列預算充實基層相關設備,以提升服務品質 與執法效能;至於「指認程序」,該署於91 年11 月召集各警察機關,開會 研議修正「警察機關實施指認犯罪嫌疑人程序要領」,並於92 年2 月修訂完 成,另將該要領納入「警察偵查犯罪規範」,俾為員警實施指認犯罪嫌疑人 之準據,以杜絕指證錯誤。
66 中華民國精彩100 監察檔案展特輯
67 貳、職權行使
68 中華民國精彩100 監察檔案展特輯
69 貳、職權行使
70 中華民國精彩100 監察檔案展特輯 公務員懲戒委員會委員黃金瑞 檔號:08602001200014 公務員懲戒委員會委員黃金瑞於任職臺中地方法院院長期間,利用其法 院院長之身分與職權,連續多次向案件繫屬於臺中地方法院之公民營銀行及 合作社以信貸方式,由該管法院之部屬為連帶保證人貸得鉅款,累計達1 億 2 千萬元之多,以分散貸款集中使用之方式,變相投資房地產,牟取暴利, 並從事珍貴古董買賣以為掩飾;3 年中其財產遽增4 千4 百餘萬元,明知應 依法申報財產故意不據實申報,嚴重違反公務員服務法第5 條、第6 條、第 13 條、第17 條及宣誓條例第6 條之規定,爰依法提出彈劾。經公懲會議決 為黃金瑞休職期間5 年。
71 貳、職權行使 彈劾案
72 中華民國精彩100 監察檔案展特輯 檢察總長陳聰明彈劾案 檔號:09902001200002 陳聰明檢察總長身為全國最高檢察首長未能依法守分,敬慎自持。於前 總統陳水扁涉貪案調查及其配偶吳淑珍被起訴之時,毫不避嫌出入總統親密 友人黃芳彥之私宅聚會;於立法院答詢與建商共餐乙事,言辭反覆;甚且親 至已具證人身分之蔡姓建商辦公處所會面;均未誠實面對各界質疑,嚴重影 響司法威信及政府形象;又對於黃芳彥出境,亦未能機先防範。廢弛職務, 違失情節嚴重,爰依法彈劾。( 本案附帶決議為急速救濟處理) 經公懲會議 決為陳聰明申誡。 本案總統於99 年1 月20 日令︰「最高法院檢察署檢察總長陳聰明已 准辭職,應予免職。」故已無再為急速處分之必要。 第2 屆至第4 屆彈劾案件法官及檢察官部分統計表(至99.10.31) 年 度 彈劾案 件 數 被彈劾 人總數 法官、檢察官被彈劾案件 案件數 被彈劾人數 合 計 法 官 檢察官 總 計 362 892 76 99 57 42 第2 屆 186 497 35 42 27 15 第3 屆 118 302 26 39 22 17 第4 屆 58 93 15 18 8 10
73 貳、職權行使
74 中華民國精彩100 監察檔案展特輯 前臺東縣長黃式鴻等人縱惡擾 檔號:04002002200004 蘭嶼鄉孤懸海外,交通非常不便,鄉民多為高山族,生活清苦。一鄉分 兩村,公教人員僅30 餘人。離縣既遠,管督難周,如任用非人,弊害百出。 查前臺東縣長黃式鴻有縱惡擾民指縱誣陷罪嫌,前蘭嶼鄉公所總幹事楊 水足、臺東縣政府教育科科長張福在、股長曾阿混、督學賴假禮、刑警隊長 李文獅、蘭嶼鄉公所巡佐田德政、戶籍副主任陳坤成、警員許福成等人,串 同構誣違法瀆職罪嫌等情,爰依法提案糾舉。 期爾後對於派往人員能妥慎遴選品學優秀者,並嚴定獎懲,隨時考察, 使良善者得安於位,頑劣者不致充數,一改過去不良風氣。 本案處理情形:黃式鴻等移請臺灣省政府依法懲處。其刑事部分,移臺 東地方法院檢察處併案偵辦。
75 貳、職權行使 民串同構誣糾舉案
76 中華民國精彩100 監察檔案展特輯 臺中市「衛爾康」西餐廳火災 檔號:08403190000042 民國84 年2 月15 日晚間7 時多,位於臺中市臺中港路上的「衛爾康」 西餐廳發生歷來死傷最嚴重的單一火災事件,造成64 人死亡、11 人受傷之 重大公安意外,全國輿論譁然,人心浮動,並導致時任總統李登輝以國民黨 主席身分向全民道歉。 監察委員於次日上午親往現場履勘,調查後發現該餐廳及隔鄰KTV 均 有違反都市計畫法相關規定、餐廳及後側停車場之防火巷被堵塞、逃生通道 標示不明、使用易燃建材等缺失,致傷亡重大,因此提出糾正案,並彈劾當 時之臺中市長林柏榕及工務局、建設局、警察局等首長。 本案發生後,政府陸續修訂與訂定各項法規,如「消防法」、「建築技 術規則」、「公寓大廈管理條例」等,實施公共場所必須使用防火建材,逃 生通道必須保持暢通,餐飲業強制投保公共意外險等重大改革,又為加強消 防事務功能,將消防自警察機關獨立,成立內政部消防署,落實「警消分離」 制度。
77 貳、職權行使 事件
78 中華民國精彩100 監察檔案展特輯
79 貳、職權行使
80 中華民國精彩100 監察檔案展特輯 嚴重急性呼吸道症候群(SARS) 檔號:09303220000043 民國92 年3 月,臺灣爆發嚴重急性呼吸道症候群(SARS),造成上百民 眾染病甚至死亡,當時社會氛圍充滿恐慌與不安。行政院衛生署輕忽傳染疾 病預防之重要性,且未能迅即進行統一調度作業,導致後續臺北市立和平醫 院爆發SARS 院內感染疫情失控、嚴重失序之事件,經監察院92 年11 月5 日財政及經濟委員會第3 屆第96 次會議審查通過糾正行政院衛生署。 本糾正案通過後,疾病管制局針對地區級以上醫院進行全面的感染管制 措施及隔離病房功能維護作業查核;衛生署並規劃完成蒐集全國最新醫護感 控等人力資料之機制,精確掌控全國各醫療院所醫護感控等各種人力現況 資料,並進行感染症醫療人力調查,蒐集醫師人力資料,建置全國護理人 員志願照護SARS 病例人力資源庫網頁,以有效掌握可運用之人力資源,使 SARS 疫情逐漸受到控制,消弭民眾的不安心理。
81 貳、職權行使 疫情之失控
82 中華民國精彩100 監察檔案展特輯 邱小妹醫療人球事件 檔號:09403220000050 1 名遭受酒醉父親家暴而造成顱內出血之4 歲女童,在送醫後卻因北部 各大醫院「沒有空的神經外科加護病床」,被迫由臺北轉往臺中縣童綜合醫 院就醫,期間耗費5、6 個小時,無法及時開刀治療,導致女童雖經緊急治 療開腦,仍不治身亡。 監察院調查後,發現臺北市立聯合醫院仁愛院區之醫師未落實執行急診 會診規定致發生重大醫療轉診處理不當事件,臺北市政府衛生局災難應變指 揮中心之標準作業程序有欠周妥,且臺北市政府對於所屬機構之調查能力、 危機處理機制未臻完善;而行政院衛生署對於急重症病床之通報及聯繫,未 能積極任事,迄未建置全國性轉診通報及處理體系等。 監察院調查糾正後,主管機關已督導並訂定急診相關制度與流程,期杜 絕人球事件之再度發生。 為使社會大眾瞭解監察院職權行使所付出的努力,監察院以本案為藍 圖,出版「走出白塔之殤—邱小妹遺愛人間」之報導文學乙書,留下完整紀 錄。
83 貳、職權行使
84 中華民國精彩100 監察檔案展特輯
85 貳、職權行使
86 中華民國精彩100 監察檔案展特輯 二二八事件 檔號:07703190000072 民國36 年2 月28 日發生二二八事件,閩臺監察 使楊亮功及前監察委員何漢文奉監察院前院長于右任 之命來臺灣調查,3 月8 日與憲兵第四團抵達基隆港; 4 月11 日乘臺南輪返抵南京,監察使楊亮功與前監察 委員何漢文於36 年4 月聯名提交「調查『二二八事件』 報告」,報告中提到:軍警死傷比臺灣人嚴重,外省 人死57 人、傷1,364 人、失蹤10 人;本省人暴徒被 擊斃43 人、俘獲85 人、自新者3,023 人。 閩臺楊監察使及監察委員於二二八事件後來臺調 查,並呈交監察院調查報告,其內容包括事變發生及 處理經過、各地損失、事變原因分析、參加事變份子 分析等。 前監察委員林純子曾於77 年間提案呼籲,政府對 二二八避而不談,造成陰影,其影響層面有擴大之虞, 主管機關亟應光明磊落,組成特別委員會澈底調查, 公布真象;對受難家屬予以賠償,以表現誠意,化解 誤會,將該日訂為「和平紀念日」,俾消弭對立情勢, 促進和諧。
87 貳、職權行使
88 中華民國精彩100 監察檔案展特輯
89 貳、職權行使
90 中華民國精彩100 監察檔案展特輯 拉法葉艦軍購案 檔號:09203200000001 海軍總部武獲室軍官尹清楓上校於82 年12 月9 日離奇失蹤,其屍體 於次日在宜蘭外海被發現。 監察院於民國89 年組成拉法葉專案小組進行調查,發現國防部暨海軍 總司令部處理尹清楓命案績效不彰,案發伊始判斷錯誤,偵察步驟緩慢,致 坐失破案契機;復因海軍總部與國防部1209 專案小組相互掣肘,刻意隱匿 重要跡證,誤導調查方向,錯失重要證物保全;且重要關係人於關鍵時刻相 繼離境,致案情陷入膠著。國防部軍購弊案偵辦之方向偏離主題,避重就輕。 前參謀總長郝柏村等違背海軍10 年主戰兵力整建及汰除綱要計畫,變更既 定購艦政策,未循軍事會談體制向總統報告,對統帥權顯欠尊重。國防部、 海軍總部強將PFG 艦(FLEX-3400 噸級)充當PCEG 艦(2000 噸級),違 背作戰任務需求,且未按國軍計畫預算制度暨重大建案之作業程序辦理;海 軍總部未遵國軍預算制度之作業程序,強將既定之蔚山級艦(PCEG)變更 為拉法葉艦(PFG)購案。又浮報、虛列拉法葉艦之合約價款。由於各項情 節涉及重大違失,嚴重破壞國家形象,戕害整體國軍士氣,監察院爰依法提 案糾正國防部,並彈劾前海軍總司令葉昌桐等5 人。 拉法葉艦軍購弊案可能是牽涉中華民國、法國高層收受軍購佣金,甚至 海軍總部武獲室軍官尹清楓上校可能因懷疑此軍購有弊端,遂保存證據以揭 弊,導致殺身之禍。除尹清楓外,法國方面更傳出有6 個與此案有關者離奇 死亡。而中華民國前總統李登輝、前參謀總長郝柏村也都因此案於2006 年 接受偵訊。拉法葉軍購弊案可說是中華民國海軍建軍以來的最大醜聞。
91 貳、職權行使 此外,監察院並適時函請海軍總司令部儘速提出退還佣金之訴以免延貽時效,該 部爰授權庫德法律事務所,向瑞士國際商會提出仲裁聲請,嗣經瑞士聯邦預審法庭裁 定本案犯罪所得及孳息先行返還我國,瑞士當局業於96 年6 月中旬命瑞士相關銀行將 合計約3,500 萬美元(約新台幣11 億元)匯回臺灣依法定程序處理中;另巴黎上訴法 院於99 年5 月11 日判決台利斯公司需賠償我方律師5 萬歐元,該公司並未提起上訴, 我方就本案已獲勝訴。全案若勝訴,法國應賠償我國15 億歐元( 約新台幣675 億元)。 監察院於調查本案過程中,除督促海軍積極辦理對法國進行佣金訴訟求償事宜外, 並主動督促特調小組偵辦本案,提供相關資料及諮詢,對案情之釐清及佣金之求償, 洵有助益。
92 中華民國精彩100 監察檔案展特輯
93 貳、職權行使
94 中華民國精彩100 監察檔案展特輯 多氯聯苯中毒案 檔號:06902003200003 民國68 年臺灣中部民眾的多氯聯苯中毒事件為國內重大公共衛生事件 之一,造成中部惠明盲校許多師生及民眾,至今仍深受其苦。 經監察院糾正案通過後,經濟部工業局即刻函請製油工會轉知工廠嚴禁 使用多氯聯苯為熱媒,並修訂「食品工廠設備設置標準」明訂新設食油工廠, 限制使用熱媒及重申不得使用有毒之材料,並為加強食品安全,衛生署於民 國70 年7 月成立食品衛生處。
95 貳、職權行使
96 中華民國精彩100 監察檔案展特輯 林肯大郡崩塌案 檔號:08703190000074 民國86 年8 月18 日溫妮颱風過境,橫掃臺灣北部地區,挾帶大量豪雨, 導致臺北縣汐止鎮林肯大郡西北側擋土牆坍塌,併同巨大岩體衝擊緊鄰擋土 牆之民宅,撞斷1、2 樓梁柱,造成80 戶房屋傾倒,死亡人數多達28 人。 根據相關技師公會指出,開發基地在基地調查部分,業主未確實執行相 關之地質及鑽探調查;在建築配置部分,未妥適考量地形及地質條件,導致 建物配置於順向坡位置,形成大規模挖除坡腳之不利工程條件,在監察委員 調查後,除糾正內政部等相關機關外,並糾舉臺北縣政府農業局水土保持課 課長陳俊龍、技士林英權、技士練瑞麟、該府秘書江坤源、工務局建造管理 課課長柳宏典、技士林振流、使用管理課技士許信行等7 人。 林肯大郡事件凸顯山坡地管理的缺失,內政部為加強管制山坡地開發, 頒訂「落實居住安全防災應變體系方案」,並於86 年11 年7 日訂頒「加 強山坡地雜項執造審查及施工查驗執行要點」,明定山坡地雜項執照審查 項目與程序及施工現地查驗事項與程序,對山坡地建築安全之保障,深具影 響。
97 貳、職權行使
98 中華民國精彩100 監察檔案展特輯 大園空難事件 檔號:08703250003270 民國87 年2 月16 日華航CI676 班機於印尼峇里島返臺北時不幸於中 正機場墜毀,機上乘客包含當時的中央銀行總裁許遠東夫婦及其他隨行官員 在內182 人及機組員14 人全部罹難。 監察委員調查發現,主管機關對重大空難事件之緊急應變處理尚無完備 機制,歷年雖多次成立專案小組督導華航公司之飛航安全,成效依然不彰; 民航局職司航空器失事預防之策劃及督導,顯未落實;對飛安管理鬆散,致 事故頻傳,飛航安全督導及檢查流於形式等,提案糾正交通部及民航局。 經調查委員持續追蹤關注,行政院據監察院糾正意旨,轉飭所屬檢討改 善採取以下各項變革:實施航空站處理航空器失事緊急應變能力總體檢;訂 定「航空器失事及重大意外事件調查處理原則」;向消防署爭取同意支援替 代役消防人力;加強各航空站之消防搶救演練;並於89 年4 月5 日修正公 布民用航空法部分條文修正案。 為避免飛安事件重複發生,自88 年6 月起將各飛安意外事件原因予以 分析,並研提改善建議,公告週知各航空公司;設置「飛航安全諮詢委員會」 整合國內整體民航資源,加強飛安改善工作;為提昇自動化及分析功能,將 以資料庫型態建置相關之飛安分析作業;加強新進檢查員之基礎訓練、在職 人員之年度複訓與專業機型訓練,以及國外飛安管理課程;要求檢查員實際 參與航空公司之專業訓練及查核等。並設置獨立之飛航安全委員會,使我國 飛航安全更向前邁步。
99 貳、職權行使
100 中華民國精彩100 監察檔案展特輯 臺大校園陳文成命案 檔號:07003260004774 民國70 年7 月14 日據報載:歸國學人陳文成暴斃於臺大校園,致死 原因及有關機關偵辦是否適法允當,不無可疑,為澈底瞭解全案經過,前監 察委員郭學禮申請自動調查、委員黃光平會同調查。 調查意見認為警備總司令部對約談陳文成經過所發布之新聞,前後未盡 一致;臺北市警察局古亭分局處理方式未可深責;另臺北地檢處(按現為臺 北地檢署)處理本案未有不當,並函知臺北市警察局仍應繼續調查有無其他 未曾發現之事實或證據。同年8 月份,調查報告英譯本並由行政院新聞局分 送有關部會暨駐外單位參用。 83 年3 月1 日鑑於本案發生多年仍未破案,各界提出質疑,監察院為 明真相,監察委員申請覆查,經覆查案件審查會審查決定准予覆查後,由謝 孟雄、趙榮耀、黃越欽委員覆查;本案嗣於85 年8 月8 日提出之調查報告 認為本案相關疑點未予釐清之前,檢察官及臺北市政府警察局應本其職責所 在,繼續調查偵辦,早日發現真象,然該局卻持消極態度,未就本案積極續 予調查,究屬不當;另軍管區司令部承辦人未依規定切實辦理移交,妥為歸 檔,善加保管,以致影響監察院之調查,該軍區司令部應嚴加檢討,並妥謀 改進作業措施,以防類似情況發生;外交部於本案,辦事消極草率,敷衍塞 責,未能尋獲鄒小韓(本案關係人)而影響本案之調查,應切實檢討改進, 經監察院抄調查意見函行政院轉飭所屬檢討改進。 由於監察院之調查結果,促使相關機關修改相關法制,並使執法手段更 符合人權,例如內政部警政署已訂頒「警察偵查犯罪規範」,以為通知犯罪
101 貳、職權行使 嫌疑人之依據;軍管區司令部(前警備總部)對「約談」之地點、時間、方式均做了 更符現代程序法制之改變(例如約談以日間行之為原則;地點視案情彈性決定;過程 中如屬案情所許,可由家屬陪同,於無人陪同時,准於談話進行中與其家人電話聯絡; 談話結束後,通知其家屬領回或送回)。
102 中華民國精彩100 監察檔案展特輯
103 貳、職權行使
104 中華民國精彩100 監察檔案展特輯
105 貳、職權行使
106 中華民國精彩100 監察檔案展特輯
107 貳、職權行使
108 中華民國精彩100 監察檔案展特輯 江國慶涉空軍總司令部女童命 檔號:09903260000045 民國85 年空軍作戰司令部某女 童姦殺命案,國防部指派空軍總部政 四處反情報隊偵辦,以刑求方式向江 國慶違法取供,並指控渠為兇手,被 告依此不法取得之供詞判決確定,執 行死刑。 案經監察院鍥而不捨調查後,於 99 年以涉有嚴重違反正當法律程序, 侵害基本人權,糾正國防部,後經重 啟司法偵審程序,終還渠清白,此案 為監察院維護司法人權之指標個案。
109 貳、職權行使 案
110 中華民國精彩100 監察檔案展特輯
111 貳、職權行使
參 》 傳承創新 一、我國監察權的傳承與創新 ◎君權時期 ◎民國肇建時期 ◎現代監察院-人權院 二、與國際接軌 三、從檔案看文字書寫工具之演變 四、調查證之創制與演進 五、檔案之典藏 ◎檔案形式 ◎典藏媒體 六、機關檔案管理金檔獎簡介
1-1 監察組織法沿革( 軍政、訓政、憲政) 1-2 非常時期監察權行使辦法 1-3 國民政府時期彈劾之法制定 1-4 監察委員產生方式之變革 1-5 監察院三年半空窗期之運作 1-6 同意權行使演遞 1-7 彈劾、糾舉、監試權之源流 七、檔案應用(保存與調閱)之創新 八、百年古蹟、世紀風華 九、時光隧道裡的歷史烙印 十、新古典巴洛克交融、大器風格 十一、遠觀美、近觀更美 十二、躡足貓道、別有洞天 十三、還我紅顏、再現古蹟芬芳 十四、清朝監察文書-奏摺 十五、監察之父于右任
114 中華民國精彩100 監察檔案展特輯 我國監察權的傳承與創新 君權時期 先秦時期為鞏固君權,即設有監察機制,至漢代御史制度的建立,監察 權始有較完整而有系統的規劃。雖然御史制度最主要的功能在為君王查察群 臣,以防貪官污吏破壞政風,然御史功能是否彰顯,取決於君主的態度:當 君王願意誠心察納諫言時,監察權方能發揮其最大之功效。 民國肇建時期 民國成立後,監察制度幾經變革,監察院從民初的「民意機關」,演變 成為現在「國家最高之監察機關」,其中的設計除仿效中國古代御史的職權 外,也參考了西方的監察機制,故而糾舉、彈劾、糾正、調查、審計、監試、 巡迴監察等功能,都在監察機制中展現。 現代監察院-人權院 「人權」為當前普世價值,且為評估現代社會進步之基礎。依據「國家 人權機關論壇」統計,全世界約120 個國家人權機關中,同時為監察機關 者(I.O.I. 會員)計51 個。為確保人民權益,監察院自民國89 年起設置「人 權保障委員會」,職掌:(1) 妨害人權案件之發掘及提案調查;(2) 人權保障 調查報告之研討及建議處理意見事項;(3) 人權法案之建議;(4) 與國內外人 權團體之聯繫並蒐集資料;(5) 研議人權教育之推廣工作;及(6) 其他有關 人權保障事項。 監察院對於人權保障業已累積豐富的工作經驗,在實務運作上,監察院
115 參、傳承創新 每年收受人民書狀多數涉及人權保障議題,且每年調查的案件中,一半以上與人權問 題相關。這些人權案件大致可分為自由權、平等權、生存權、政治參與、司法正義、 醫療照護、工作權、財產權、文化權、教育權、環境資源權、社會保障等12 類。因此, 現代之監察院當可說是「人權院」。 回顧中外歷史可以發現,許多重大的人權侵害事件係與行政部門有關—包括行政 作為嚴重違反人權,或政府作為不足以保障人權。監察院監督各級政府機關及其公務 員的作為是否違法或失職,透過職權行使,不僅能充分保障人民權益,更能革除行政 機關對人權之侵犯。
116 中華民國精彩100 監察檔案展特輯 (資料來源:國立故宮博物院)
117 參、傳承創新 (資料來源:國史館)
118 中華民國精彩100 監察檔案展特輯 與國際接軌 國際監察組織(International Ombudsman Institute, I.O.I.),成立於西元 1978 年,為一非政府組織(Non-Government Organization, NGO),旨在倡 導監察及人權理念,鼓勵並支持對監察使任務之研究,推展對於監察人員或 有興趣人士之教育訓練計畫,並促進全世界監察使資訊、經驗之交流,以及 籌劃與舉辦國際監察會議等活動。目前已有150 餘個國家或地區成立監察 機關(構)。 為宣揚我國監察制度並與世界各國監察機構交流接軌,監察院於1994 年8 月以「中華民國監察院」(Control Yuan of R.O.C.)的名義加入國際監 察組織,並於1994 年9 月在臺北主辦「認識監察權」國際研討會,為中西 監察制度交流揭開劃時代之一頁。 為促進我國與國外監察機關(構)之雙邊合作,曾於1999 年、2002 年及2003 年分別與阿根廷、巴拿馬及巴拉圭護民官署簽署雙邊監察機構暨 技術合作協定,積極參加國際監察組織會議,適時宣揚我國監察職權與績 效,並邀請國際監察組織及各國監察領域之重要成員來臺訪問,在全球非政 府組織活動中占有一席之地。 「100 年3 月23 日至25 日於中華民國臺北舉行第26 屆澳洲及太平洋 地區監察使(Australasian and Pacific Ombudsman Region, APOR) 年會,是我 國監察院自1994 年加入國際監察組織(I.O.I.)17 年來,首度成功爭取在我國 舉辦的區域性國際年會,國際監察組織理事長Beverly Wakem 女士等31 位 重量級貴賓應邀來臺,與會國家共計20 國,與會貴賓及監察委員針對監察 與人權,討論熱烈,交流圓滿成功,讓監察外交更加向前邁進一大步。」
119 參、傳承創新 本院加入I.O.I. 首張會員卡
120 中華民國精彩100 監察檔案展特輯
121 參、傳承創新
122 中華民國精彩100 監察檔案展特輯 98 年11 月27 日洪委員昭男、葛 委員永光拜訪歐盟監察使Mr. P. Nikiforos Diamandouros 98 年10 月27 日監察院出席「第 14 屆伊比利美洲監察使年會」, 代表團趙委員榮耀及李委員炳南 與大會主辦人西班牙國家護民官 Mr. Enrique Mgica Herzog ( 中) 及 FIO 聯盟會長Mr. Omar Cabezas Lacayo ( 左2) 合影留念 99 年3 月18、19 日監察院國際事務 小組趙委員榮耀、葛委員永光前往澳洲 首府坎培拉市,代表本院出席第25 屆 澳洲及太平洋地區監察使年會
123 參、傳承創新 100 年3 月23 日至25 日於中 華民國監察院,舉辦「第26 屆澳洲及太平洋地區監察使年 會」 I.O.I. 理事長Wakem 女士等與會貴賓, 體驗傳統布袋戲的特技表演,與會人士 各個目不轉睛,笑開懷 瓜地馬拉副總統拜訪監察院院長王建煊
124 中華民國精彩100 監察檔案展特輯 國際監察組織2011年會員名錄 AFRICA 非洲地區 Botswana 波札那 Burkina Faso 布吉納法索 Ivory Coast 象牙海岸 Lesotho 賴索托 Mali 馬利 Mauritius 模里西斯 Namibia 納米比亞 South Africa 南非 Tanzania 坦尚尼亞 Tunisia 突尼西亞 Uganda 烏干達 ASIA 亞洲地區 Hong Kong 香港 【註】 Indonesia 印尼 Japan 日本 Macao 澳門 Pakistan 巴基斯坦 South Korea 南韓 Thailand 泰國 Taiwan 臺灣 【註】 AUSTRALASIA & PACIFIC 澳洲及太平洋地區 Australia 澳大利亞 Cook Islands 庫克群島 New Zealand 紐西蘭 Papua New Guinea 巴布亞紐幾內亞 NORTH AMERICA 北美洲地區 Canada 加拿大 United States of America 美國 CARIBBEAN & LATIN AMERICA 加勒比海及拉丁美洲地區 Antigua/Barbuda 安地卡及巴布達 Argentina 阿根廷 Bermuda 百慕達 Guatemala 瓜地馬拉 Mexico 墨西哥 Peru 秘魯 Puerot Rico 波多黎各 Trinidad & Tobago 千里達及托巴哥 資料來源:國際監察組織網頁,自2009 年9 月1 日起,國際監察組織總部設於至奧地利維也 納(Vienna, Austria) 註: 香港和台灣地理區位於亞洲地區,惟國際監察組織區域會籍屬澳洲及太平洋地區。
125 參、傳承創新 EUROPE 歐洲地區 Albania 阿爾巴尼亞 Andorra 安道爾 Armenia 亞美尼亞 Austria 奧地利 Belgium 比利時 Bulgaria 保加利亞 Croatia 克羅埃西亞 Cyprus 塞普勒斯 Czech Republic 捷克 Denmark 丹麥 Estonia 愛沙尼亞 European Union 歐洲聯盟 Finland 芬蘭 France 法國 Germany 德國 Gibraltar 直布羅陀 Greece 希臘 Greenland 格陵蘭 Hungary 匈牙利 Iceland 冰島 Ireland 愛爾蘭 Israel 以色列 Italy 義大利 Latvia 拉脫維亞 Lithuania 立陶宛 Luxembourg 盧森堡 Macedonia 馬其頓 Malta 馬爾他 Moldova 摩多瓦 Netherlands 荷蘭 Norway 挪威 Poland 波蘭 Portugal 葡萄牙 Romania 羅馬尼亞 Slovac Republic 斯洛伐克 Serbia 塞爾維亞 Slovenia 斯洛維尼亞 Spain 西班牙 Sweden 瑞典 Switzerland 瑞士 Turkey 土耳其 Ukraine 烏克蘭 United Kingdom 英國 Uzbekistan 烏茲別克
126 中華民國精彩100 監察檔案展特輯
127 參、傳承創新
128 中華民國精彩100 監察檔案展特輯 從檔案看文字書寫工具之演變 檔案為辦結公文書之累積,公文則為處理公務之文書,依一定之程式, 以書寫工具載述於特定之載體,以做為處理公務意思表達、溝通之方式,是 觀察檔案文書之外觀,除公文程式外,最易引人囑目的,應為各時期公文書 寫工具之差異。 各民族於遠古之時,各取其居住地區中最易獲得之天然物質製成書寫工 具,而因新材料之發現、製作技術之進步及文化交流日趨頻繁,新式書寫工 具不斷取代舊式工具。西方書寫工具從西元前6000 年蘆葦筆、莎草紙、墨 水,到18 世紀演進至自來水筆、紙兩項工具、19 世紀後發明鋼筆。而中國 在殷商時期即已出現了毛筆,近現代以來,隨著書寫工具的演進,傳統的毛 筆已經被鋼筆、原子筆和鉛筆取代,現時書寫一般都使用硬筆,隨著資訊化 時代電腦普及,動筆機會漸減,鍵盤、網路已成為新一代的書寫工具,例如 隨著公文數位簽核之推動,網路已取代紙、筆成為新一代的書寫工具,隨之 產生之電子檔案及其管理,也成為檔管人員之新課題。 本院第三代公文及檔案管理系統業於99 年底建置完成,100 年正式上 線,實施數位簽核,是自100 年伊始,本院公文書寫工具暨檔案管理已步 入嶄新的里程。
129 參、傳承創新 民國32 年毛筆繕寫之公文(資料來源:國史館)
130 中華民國精彩100 監察檔案展特輯 民國36 年毛筆繕寫之公文(資料來源:國史館)
131 參、傳承創新 民國39 年間刻版油印之公文(資料來源:檔案管理局)
132 中華民國精彩100 監察檔案展特輯 民國40 年間打字油印之公文(資料來源:檔案管理局)
133 參、傳承創新 民國69 年間原子筆書寫之公文
134 中華民國精彩100 監察檔案展特輯 調查證之創制與演進 證件通常做為身分之證明,民主法治時 代,執法人員因故洽接當事人或關係人時,做 為執法身分之證明,尤為必需。 監察院行使職權須為調查,故於民國20 年建制之初,為配合當時監察院組織法第4 條 「監察院得隨時派員分赴各公署及其他公立機 關調查檔案冊籍,遇有疑問,該主管人員應負 責為詳實之答覆」之規定,考量實際派員調查 應有憑證,實施調查方無窒礙,爰製訂「監察 院調查證使用規則」,經本院第29 次院會通 過並呈奉當時國民政府指令准予備查在案,嗣 迭經22 年、30 年、37 年、63 年、90 年歷次 之修訂而呈現今貌。
135 參、傳承創新 國民政府調查證(資料來源:檔案管理局) 民國38 年調查證(資料來源:檔案管理局)
136 中華民國精彩100 監察檔案展特輯 民國38 年調查證(資料來源:檔案管理局)
137 參、傳承創新 民國39 年調查證(資料來源:檔案管理局) 民國38 年調查證(資料來源:檔案管理局)
138 中華民國精彩100 監察檔案展特輯 民國40 年調查證
139 參、傳承創新 民國 83 年調查證
140 中華民國精彩100 監察檔案展特輯 民國91 年調查證
141 參、傳承創新 民國 94 年調查證 民國92 年調查證
142 中華民國精彩100 監察檔案展特輯 民國97 年調查證
143 參、傳承創新 民國98 年調查證 民國99 年調查證
144 中華民國精彩100 監察檔案展特輯 檔案之典藏 檔案形式 我國現存最早的檔案是商代的甲骨檔案,之後又出現青銅銘文檔案、簡 牘檔案、金石檔案、縑帛檔案等,再到後來一直使用到今天最多的紙張檔案。 近現代以來,由於科技的發展,檔案載體種類增多,檔案的形式也日漸增多, 大量出現以膠片、磁性材料及光碟為載體的膠片檔案、磁性載體檔案和光碟 檔案等。 典藏媒體 檔案的儲存媒體種類依其形式可大致分為:紙張、微縮、磁性、光學四 種。其中「紙張」和「微縮」屬於傳統的類比資料;「磁性」和「光碟」是 屬於現代的數位資料。以下謹介紹數種普遍使用之儲存媒體: ( 一) 紙張 紙張的主要原料是纖維,由纖維韌度較強、較具光澤的植物,如麻、竹、 桔、藤……等製成。許慎在<說文解字>中曾提:紙,絮一沾也,沾,潎絮 簣也,潎,於水中擊絮也;服虔<通俗文>內則謂:方絮曰紙。所以,「絮」 是原料,「沾」是工具,「潎」是方法,而「方」就是成品形狀了;也就是 說,紙,是水中的絮,經過濾水之簣脫水,黏結後而成的方形物。 以紙張為儲存載體之優點是不須藉助任何工具即能直接閱讀,缺點則是 儲存空間大,易受人為、自然環境的破壞。本院自成立檔案庫房至今所儲存 之檔案仍以紙類檔案為最大宗。
145 參、傳承創新 ( 二) 微縮 微縮是將紙張等原件資料縮小成膠片,其優點僅需簡單工具(如放大鏡)即能閱 讀,減少保存空間,缺點是製作及複製須使用特殊機器。監察院自70 年代起為長久保 存歷史檔案紀錄,除紙類檔案外同時採用微縮方式儲存重要檔案,後因新科技日新月 異,現已採用其他載體如光碟等作為儲存資料之主要載體之一。 ( 三) 磁性(如磁帶等) 主要靠磁性紀錄的方式,將資料用磁頭寫進磁片表面,使用磁頭讀取磁片表面的 資料。其優點能大量儲存資料,缺點是因讀取路徑固定,找尋資料所花費之時間較長, 且其機械結構精密,所以可靠度較差,稍一不慎,資料即可能遺失。 ( 四) 光學(如CD 、DVD 光碟片等) 隨著科技發展,儲存空間之需求愈來愈大,從1980 年代發明光碟片以後,就迅速 取代磁性媒體成為儲存資料之主流載體。其原理是在光碟片上產生許多細微凹洞來記 錄資料,利用雷射光感應資料內容。光碟片優點是儲存資料量龐大,缺點是仍無統一 的標準,且與磁性媒體相同,可靠度仍待加強。 載體之於檔案,如同制度之於國家一樣,皆是使過去的文化光輝得以傳承後世的 重要工具,必須不斷的創新思維,才得以繼續發揚光大。
146 中華民國精彩100 監察檔案展特輯 機關檔案管理金檔獎簡介 檔案管理局於民國91 年設置「機關檔案管理金檔獎」,並於92 年舉 辦第一屆評獎活動,是我國檔案管理制度之創舉,目的在於鼓勵各機關積極 配合檔案管理新制的落實,藉此表彰著有卓越績效之機關,以及長期默默奉 獻的檔案管理人員,進而提升檔案管理專業尊嚴,建立工作榮譽感,提振檔 案管理人員的士氣,樹立現代檔案管理之最佳標竿,監察院於首屆舉辦即獲 此殊榮。
147 參、傳承創新
148 中華民國精彩100 監察檔案展特輯 檔案應用(保存與調閱)之創新 監察院第一屆會議議事紀錄資料庫 監察院第一屆會議議事紀錄,包含自民國37 年至民國82 年間共2,030 會次,以及年度總檢討會議、臨時會議與預備會議之紀錄檔案共303 冊, 計146,223 頁。自文件產生迄今已有多年歷史,為全民之珍貴紀錄檔案。將 議事紀錄文件以數位掃描,配合資料庫檢索功能,除可將珍貴之原始紀錄史 料典藏保護,避免因累次使用而受損;運用資訊技術方便使用者快速檢索與 瀏覽數位化之檔案內容。 資料庫內容: 議事紀錄數位影像PDF 檔 會議種類、會次、會議時間與各會次關鍵字15 個 資料庫檢索方式: 以會議種類、會次、會議時間或各會次關鍵字條件檢索 以會次瀏覽議事紀錄 資料庫使用範圍: 監察院院內各連線電腦登入帳號與密碼使用 索引更新: 各會次關鍵字可異動、增加或更新
149 參、傳承創新
150 中華民國精彩100 監察檔案展特輯
151 參、傳承創新
152 中華民國精彩100 監察檔案展特輯
153 參、傳承創新
154 中華民國精彩100 監察檔案展特輯
155 參、傳承創新
156 中華民國精彩100 監察檔案展特輯 百年古蹟、世紀風華 行經臺北站前川流不息的忠孝西路,跨越中山南路的瞬間,您可曾佇足 凝望,這座守護人民權益的國家級古蹟,正伴著臺灣走過一世紀,讓我們帶 著您走進老州廳,看見臺北城最美的後花園。
157 參、傳承創新 1915 年完工景象
158 中華民國精彩100 監察檔案展特輯 時光隧道裡的歷史烙印 監察院的原址原本是臺北城牆東段外的荒郊野地,日本政府拆了臺北城 牆、填平城河,在上面興築了一條全臺最寬敞的「三線道路」(今中山南 路),這條新的權力軸線上,公共建築林立,臺灣總督府近在咫尺。臺北州 廳就建於三線道路與「基隆街」(今忠孝東路)交會的轉角處,位置重要。 這座國家古蹟,興建於民國2 年( 西元1913),初建時稱為「臺北廳新
159 參、傳承創新 昭和年間入口處外觀 廳舍」,後來改名為「臺北州廳舍」,民國4 年竣工,成為北臺灣最高行政機關,管 轄臺北州,轄區涵蓋今天的臺北市、新北市、基隆市和宜蘭縣。光復之後成為臺灣省 行政長官公署、臺灣省政府的辦公房舍,民國47 年監察院進駐現址,依法行使監察權, 成為職司風憲、捍衛人民權益的守護者。在歷史的長河裡,她總是站在時代的浪頭, 扮演著維護人民福祉與臺灣發展舉足輕重的角色。
160 中華民國精彩100 監察檔案展特輯
161 參、傳承創新 監察院現況
162 中華民國精彩100 監察檔案展特輯 新古典巴洛克交融、大器風格 這棟後文藝復興時期風格的二層樓鋼筋混凝土磚造建築,是臺灣目前保 存最完整的巴洛克式建築,由臺灣總督府的官方建築師森山松之助負責設 計,在日本明治維新西化風潮下,把歐洲式樣建築風格大量引進臺灣,被視 為臺灣受後文藝復興時期影響最具代表性的建築代表作。 初期建造之時,為了配合基地的特性,建築物的平面設計由圓頂入口處 向左右兩向延伸,兩翼立面造型相同卻不對稱;而呈九十度的角,角落部分 取突出弧形門廊,令人不覺尖角的銳利,尤其兩翼對立展開,構成華麗而不 失嚴謹的形象。從大門入口的主體建築,就可看出揉合了各種風格,「拜占 庭式」的「碟形圓頂」,華麗「巴洛克風格」的「破縫山牆」,仿「羅馬時 期」的「半圓形窗框」,改良「托斯坎式」的大門、大廳立柱,「愛奧尼克 式」的二樓,「曼薩爾式」的兩翼屋頂紅磚與灰白仿石營造出帶狀滾邊的外 牆……各種建築語彙爭奇鬥豔,相互輝映。 從建築式樣也可以看出監察院的藝術價值,平面形式及垂直動線機能的 設計,簡單清楚,反映當時全面追求理性思考的建築思潮;另外,簡潔的外 觀,富有裝飾,紅磚牆面及磚拱構造,具時代意義,為古典式樣建築風格的 表達。無論是建築藝術與時代風格,監察院都是古典派建築的典範;而其建 築語彙及裝飾,更反映出近代建築的帝國主義思考盛行所帶來的東、西文化 交流的藝術旅跡。
163 參、傳承創新 碟形圓頂
164 中華民國精彩100 監察檔案展特輯 破縫山牆
165 參、傳承創新 半圓形拱窗 勳章壁飾
166 中華民國精彩100 監察檔案展特輯 八柱式門廊
167 參、傳承創新 衛塔 曼薩爾屋頂
168 中華民國精彩100 監察檔案展特輯 遠觀美、近觀更美 來到監察院,首先印入眼簾的,是她莊嚴巍峨的堂皇門面,只要面朝正 門,佇立凝視,監察院的建築之美,將一覽無遺。拜占庭式銅製碟形圓頂, 和四周環繞的12 個半圓採光窗,組成美麗的圓弧,與破縫山牆銳利的線條, 恰成對比,在藍天白雲下各展風情。 綴有拱心石的半圓形拱窗,是典型羅馬式建築風格,一對盾牌式勳章壁 飾,為半圓形拱窗作美的間隔,像為建築物配戴耀眼的勳章。托斯坎式圓柱 撐起圓形的八柱式門廊,替入口塑造雄偉的印象,八角形的衛塔左右護衛, 增添威嚴與莊重,牛眼窗給牆面注入活潑的氣息,紅磚與仿石塊相間,畫成 平行線條,讓外牆顯現不凡變化。 走進挑高18 公尺的大廳,寬敞雄偉,讓您不自覺地抬頭仰視,巍巍圓 頂天花以君臨天下的氣勢回看您,四對托斯坎式雙柱環立身旁,似等候您的 青睞。此時,M 型樓梯正向您招手。拾級而上,踩著灑滿光影的階梯,迂迴 地上了二樓,美不勝收!圓頂天花近在眼前,羅馬萬神殿式格框,中心色彩 亮麗的彩繪玻璃、精緻的花果裝飾,都令人神往。撫遍欄杆,內心澎湃,或 細細品味雄偉的愛奧尼克雙柱,或邁向泛著光影的兩翼迴廊,我心徘徊,悠 遊神往……。
169 參、傳承創新
170 中華民國精彩100 監察檔案展特輯 躡足貓道、別有洞天 從2 樓一個隱密的迴旋梯盤旋而上,迎接您的是縱橫交錯,由柳杉木架 構成的屋頂木桁。小心翼翼躡足貓道,朝著光源低頭跨步出去,回看出口處 正是老虎窗。此刻,已到了曼薩爾式屋頂的平台,藍天為頂,但覺天地悠悠, 圓頂更顯雄渾,仔細端視,頂上卻有輕盈金屬飾物,半圓採光窗,正向您眨 眼。移動步伐,與您擦身的龐大身軀,竟是衛塔的上圍,破縫山牆的破空處, 恰似觀景窗,有雲朵飄來,伴您悠遊神境。 2 樓的露台像私密的庭院,半圓形拱窗、勳章浮雕、衛塔等都不睬街上 的喧嘩,以特寫的身姿,風情萬千的呈獻給您……。自衛塔延伸的左右兩翼 房舍,分別臨著忠孝東路與中山南路,從路邊遠觀,是牆面與窗的排列,是 紅磚與灰白仿石的對話,比例優美,色調典雅。近看每一細部,半圓拱窗、 牛眼窗、斗蓬雨披、貝殼形兜帽,都在訴說這歐洲式建築的不同丰采。
171 參、傳承創新
172 中華民國精彩100 監察檔案展特輯 還我紅顏、再現古蹟芬芳 監察院面對忠孝東路的左翼建築,部分房舍原來是由漁業署使用,年久 失修。監察院接收後,委請著名建築師漢寶德主持修護專案,做全盤的調 查、記錄、研究,這項古蹟再生工程,歷時經年,終於圓滿達成。 當時的紅磚牆因覆蓋油漆,蒙蔽多年,經過去漆的新工法處理之後,才 讓紅牆原貌重現,再度散發古蹟的光輝。屋頂黑瓦來自江蘇的御窯,臺灣因 環保因素無法製作黑瓦,為了翻修屋頂,特地跨海向江蘇的御窯量身定製了 5 萬餘片黑瓦。這種黑瓦,燒製時是在窯中以稻殼悶燒49 天,期間不能熄 火,之後再陰乾12 天,為了燒製這一批黑瓦,專屬紫禁城的江蘇吳縣御窯 村,全村數百村民總動員,費時半年餘才完成。完成後的黑瓦黑可鑑人,質 地堅韌,敲擊時有金屬之聲,完全防潮,使用到下一世紀仍完好如初。 監察院的古蹟修復工程,非常嚴謹用心,堅持以恢復原狀為原則,修護 過程都詳加記錄,為這座國家古蹟,保留了歷史的風貌,成為古蹟再生的典 範,在古蹟的活化上,更寫下重要的篇章,成為文化的標竿。 恭逢建國一百年,監察院建築記錄了兩個時代的生活與發展,是歷史的 見證,由昔日三線道路上高不可攀的威赫象徵,成為人民權益的守護神。她, 融合了歐洲式樣建築各種風格,是國家級古蹟中的精品,精雕細琢,從外觀 到內涵,都散發著建築之美與歲月的芬芳。她,遠觀美,近看更美,有雄偉 的一面,也有秀麗的倩影,陽光下恢弘壯麗,燈光裡又柔情萬千,探訪時切 勿行色匆匆,定要細細品嚐,任何角落都可能帶給您驚豔。
173 參、傳承創新
174 中華民國精彩100 監察檔案展特輯
175 參、傳承創新
176 中華民國精彩100 監察檔案展特輯 清朝監察文書—奏摺 清代為加強君臣間之聯繫,歷康、雍、乾三朝,逐漸發展出由高階官員 直接向皇帝奏報政務、私事及所見所聞的奏摺。奏摺由官員繕寫、封固、遞 送,不經內閣,直呈皇帝。雍正年間,軍機處成立,經皇帝批閱後的奏摺, 發交軍機處謄抄副本備查,稱為「奏摺錄副」。清代奏摺及奏摺錄副由於內 容豐富,又為官員直接向皇帝的稟報,並經由皇帝硃批,是研究清史的第一 手資料。從清代奏摺和奏摺錄副中,可以發現清帝對於臺灣的監察官員的業 務指示,以及監察官員處理監察業務的奏報。 清朝於康熙22 年收復臺灣後,對於臺灣輿情甚為重視;因此,對於派 遣臺灣監察人員十分慎重,對於官員的行事亦有要求。清世宗對於監察官員 的訓令是「和衷二字,第一緊要。如有道不同處,只要秉公據實密奏,不可 匿怨而友,以誤公務」,即希望監察官員能在和諧的氣氛下堅守原則。如雍 正3 年,巡視臺灣監察御史禪濟布奏報臺灣府城建築木柵情形時,清世宗 在硃批中對於監察人員與其他官員在施政上和衷共濟的態度加以肯定。而禪 濟布也不負清世宗的重用,除了「凡地方之利弊、吏治之賢否,靡不日切體 訪」。他先協調前御史丁士一、臺灣總兵林亮等人,告誡臺灣知縣周鍾瑄, 勸其改過自新不成後,才於同年10 月上奏糾舉。 除此之外,清世宗對於舉報違法官員訊息的保密特別重視,曾批稱:「凡 事秉公,爾之職分只以無隱為要,勉力為之。凡有密奏,密之一字甚為緊 要。」巡視臺灣監察御史的工作除糾舉官員不法外,對於一般民生問題亦十 分關心。在巡視臺灣監察御史索琳〈奏報臺灣地方雨水糧價情形〉一摺中, 清世宗就指出「爾等地方官員之干係者亦居大半」,可見其對於監察御史探 求民隱的重視。由於臺灣各地大規模進行墾拓,不免產生原住民和漢人衝突
177 參、傳承創新 的問題,清世宗也指示監察御史,要能使每個族群「各安生理,彼此不相干」,來調 和族群衝突。 雍正年間,部分監察官員體認到職掌與行政官員有所重疊,「有巡查之責,無畫 一之規」,因而請求欽敕巡視臺灣之職任以專責成,但並未受到重視。乾隆後期,臺 灣爆發林爽文事件,由於此一民變與與吏治敗壞有關,平亂之後,閩浙總督福康安在 乾隆53 年上〈奏報清查臺灣積弊酌籌善後情形〉摺,請求將臺灣道員加按察使銜成為 定制,獲得朝廷同意。清高宗特別諭示已赴任的萬鍾傑說:「此任不比尋常,諸凡留 心,力去舊弊。勉之!慎之!」 清朝臺灣兵事頻仍,展件中也呈現出監察官員對於臺灣軍務的積極參與,尤其是 軍政的稽查和國際形勢的判斷,也成為臺灣監察官員的任務之一。如嘉慶5 年,由福 建臺灣鎮總兵愛新泰及按察使銜臺灣道遇昌聯名,鉅細靡遺地奏報了4 年12 月,福建 班軍在澎湖遭遇颱風,造成傷亡損失的情形。而甲午戰前,在臺的監察官員也上奏指 出了「臺灣係日夷垂涎之地」,正確的預知了當時的國際形勢,為臺灣的防務做出貢 獻。 (資料來源:國立故宮博物院)
178 中華民國精彩100 監察檔案展特輯
179 參、傳承創新 監察御史索琳〈奏報臺灣地方雨水糧價情形〉(資料來源:國立故宮博物院)
180 中華民國精彩100 監察檔案展特輯
181 參、傳承創新 監察御史索琳〈奏報臺灣地方雨水糧價情形〉(資料來源:國立故宮博物院)
182 中華民國精彩100 監察檔案展特輯
183 參、傳承創新 閩浙總督福康安在乾隆53 年上〈奏報清查臺灣積弊酌籌善後情形〉(資料來源:國立故宮博物院)
184 中華民國精彩100 監察檔案展特輯
185 參、傳承創新 閩浙總督福康安在乾隆53 年上〈奏報清查臺灣積弊酌籌善後情形〉(資料來源:國立故宮博物院)
186 中華民國精彩100 監察檔案展特輯 監察之父—于右任 監察院前院長 于右任(民國前33 年4 月11 日~ 民國 53 年11 月10 日), 陝西三原人,祖籍涇 陽。原名伯循,字右 任,晚年自號「太平 老人」。清朝光緒年 間舉人,民前8 年 因刊印《半哭半笑樓 詩草》譏諷時政為三 原縣令德銳和陝甘 總督升允舉發,遭清 廷通緝,亡命上海, 遂進入震旦公學。後 於日本加入光復會 和同盟會。民國成立前5 年當中,創辦《民呼日報》、《民籲日報》、《民 立報》暨《神州日報》鼓吹革命,民國6 年響應國父護法運動,成立陝西靖 國軍,任總司令。 于前院長歷任南京臨時政府交通部次長、國民聯軍駐陝總司令、審計 院、監察院院長,是國民政府時代重要決策人物。民國37 年曾參選副總統。 民國38 年隨政府來臺。前後任監察院院長計34 年。民國53 年病逝於臺北, 監察之父于右任先生(資料來源:劉延濤文教基金會)
187 參、傳承創新 墓位於陽明山國家公園。 于前院長一生清廉,即使長期歷任政府高官,去世時沒有留下任何財物,隨身的 小箱空空如也。他曾書囑前總統蔣經國先生:「計利當計天下利,求名應求萬年名」。 于前院長精書法,尤擅草書,是位大詩人,被尊為當代放翁。竭力購藏北碑、草帖, 對保存文化不遺餘力。首創“標準草書”,被譽為“當代草聖”、“近代書聖”。于前 院長於民國21 年在上海創辦標準草書社,以易識、易寫、準確、美麗為原則,整理、 研究與推廣草書,整理成系統的草書代表符號,集字編成《標準草書》千字文,影響 深遠。來臺15 年期間,臺灣書法風氣首次出現碑學壓倒館閣帖的趨勢。著作有《右任 詩存》、《右任文存》、《右任墨存》、《標準草書》等。長髯飄飄,是其一大特徵。 于前院長臨終詩“葬我於高山之上兮,望我大陸;大陸不可見兮,只有痛哭。葬 我於高山之上兮,望我故鄉;故鄉不可見兮,永不能忘。天蒼蒼,海茫茫,山之上, 有國殤。”至今廣為流傳。
188 中華民國精彩100 監察檔案展特輯 民國53 年6 月前院長于右任與張大千先生、劉延濤先生同攝於臺灣(資料來源:劉延濤文教基金會)
189 參、傳承創新 前院長于右任與蔣中正先生、王寵惠先生參加國家大典。(資料來源:劉延濤文教基金會) 前院長于右任與監察委員同仁合影,劉延濤( 後左一),劉候武( 香港中文大學 校長劉遵義之祖父)( 前左二)(資料來源:劉延濤文教基金會)
190 中華民國精彩100 監察檔案展特輯 前院長于右任與劉延濤夫婦( 左二右三)、姪女于志賢女士( 香港中文大學校長劉遵義之母)( 左三) 等於劉府花園合影。(資料來源:劉延濤文教基金會)
191 參、傳承創新 民國52 年11 月8 日參觀劉延濤先生水墨山水畫展於中山堂留影。(資料來源:劉延濤文教基金會)
192 中華民國精彩100 監察檔案展特輯 監察院前院長于右任之墨寶 (資料來源:劉延濤文教基金會)
193 參、傳承創新 監察院前院長于右任之墨寶(資料來源:劉延濤文教基金會)
194 中華民國精彩100 監察檔案展特輯 監察院前院長于右任之墨寶(資料來源:劉延濤文教基金會)
195 參、傳承創新
196 中華民國精彩100 監察檔案展特輯
197 參、傳承創新 監察院前院長于右任之墨寶(資料來源:劉延濤文教基金會)
國家圖書館出版品預行編目資料 中華民國精彩100監察檔案展特輯 / 監察院編輯. -- 初版. -- 臺北市:監察院, 2011. 08 面; 公分 ISBN 978-986-02-8861-2(精裝) 1.監察院 2.檔案展覽 573.82 100016231 中華民國精彩100 監察檔案展特輯 發 行 人:王建煊 編 輯 者:監察院 出 版 者:監察院 地 址:臺北市忠孝東路1段2號 電 話:(02) 2341-3183 綱 址:www.cy.gov.tw 展 售 處:國家書店松江門市 臺北市松江路209號1樓 (02) 25180207 五南文化廣場 臺中市中山路6號 (04) 22260330 國家網路書店:http://www.govbooks.com.tw 印 刷 者:文匯印刷資訊處理有限公司 地 址:臺北市環河南路2段211號 傳 真:(02) 23021170~2 中華民國100年8月初版 定 價:新台幣550元整 GPN:1010002632 ISBN:978-986-02-8861-2 著作權管理訊息 著作權人:監察院 ◎ 欲利用本書全部或部分內容者,須徵求著作權人同意或書面授權,請洽監察 院綜合規劃室(電話:2341-3183)。
FD06132 | 1996_港澳台_香港_嘉利大厦大火_政府回应调查委员会最后报告书.md
分类:06_境外及港澳台调查报告 | 年份:1996 | 地域:香港 | 严重程度: | 场所: | 起火原因: | 来源格式:md
1996年香港嘉利大厦大火—政府对调查委员会最后报告建议的回应
sD
SOFϬFsDBXDDQjHܤK
qܡGGK|G@KCCC
@EEC~KGQE]P^
@D@]FqqDwX @D@pz]FqqPsDɽ @D@FMߧﵽw @D@@EEC~b~gٳi @D@pi[ֵoXJ @D@¯l[jgBʲĤ@qUP @D@D]DkήȫȳQP}EӤ @D@֤߭pN䪺ζH @D@ʤupѪNƧѿZ˳ D@yݨDP D@OpayŧO D@ȸpiu{ﵽsɰϨѤt D@FFΤjĮ[toiiUݬs D@ʯfji D@@EE~~gٲέpiX D@EC~CfέpƦr D@@EEC~C멳~xƼƦr
D@lFpoSOl@ȷ|ij D@puͤ~i_o
D@]FqqDwX @@@
@@]Fqqv觹DwxXݦ{̫@СоC
@@L]P^|hQȬ٬٪²ǼwM]FݦhCu~U
vMwCߤWALXuȬwǷ|DȤߥD쪺߮bA÷|hjqF `C
@@]Fqq`xXݿDwɻGuXݪȡAOVDw|B ӬɻSάFxAѭbC@^k̷spĤ@ơCv
@@vGuڦbaPҦIJH͡AϥL̷P쭻y@p `zCqL̪Aڻ{ڤwjjWjDw̹ﭻ䪺HߡCv
@@vܡALPhCu~UΨLx|ͫܦGC
@@LGubu~NMhCoiWܦhaݭnDzߡAڧƱ死 bo譱PDwHh洫߱oCv
@@XݪAvexMԡCFP`z|~ALٻPh
DnBzuөMĨưȪFx|AõoFTDDtC
@@vNKTQ@]P^ߪC
D@pz]FqqPsDɽ @@@
@@HUpz]FqqKӤ]P^UȦbF`PsDɽ 峡G
]FqqGQM骺ѥjiʡAް_֤HhCO @ƱnOoAOѥuOڭ̸g䤤@ӡCڭ̤wF@
EEC~Wb~g٪pΧڭ~Ҧp~g٪p|íaW
AWvOʤICbopUAMѥiʡAڭıo|vT 쭻g٪աAt~@Iڭ̥iHݨ쪺AOMbo骺iʤAѥ ROܦǩMZAopҩMҺʹѥצܦn
zCMA@ڪĤߡAbڭ̥|PѥĦiʪpUA vTӪiʬOiHzѪC
O̡G䩲O_ݭnIíwH
]FqqGڭ~wLA̭nOݥB@O_ܦǩMZCt @譱Aڭ̪gٰլO_íAJMoǵץOܡAF ĨFqzwC
O̡G۴Ѥw^F@U|dIANӪѥUP@iA^AA̷|_ i@BIKKH
]FqqGѥiʡAڬ۫HAbujaӦ]oӱpAӱ FIA]o˰kOA̭nOB@O_`BǩMZ C
O̡GK͡AͤwLܭȱohQQAڭ̦ojxơAO_Ҽ{ @½ô䤸A٬OyΨӺݭnAܦhͪưȡHI ӫˡH
]FqqGڭxƪDAڭ̥naҼ{AҼ{ɡAM
|C
O̡G]FxƤ֤FQGA]OH
]FqqGAO]FxƤ֤FQGA]FxƨèS֡Aڬ۫HA AOާ褽~xƪơC~xƪƷMObPɶ
|ҤPAڬ۫HL̤wLFĴpAb@~FJMX
AҦpA@ܥ|몺JXjFCɬOXjJCҥHb @qɶӻA~xƨǷLܰʬOܥ`ƱCh¤jaC
D@FMߧﵽw @@@
@@SϬFoH]P^ܡAFxP°k|^kxkx
J꿳MѥLɪլde|AŧQjHjiլdAç̫լd iѡC
@@FxWȷ|J꿳kxAQצiC
@@oHGuiѴNpﵽw@X@tCʪijAF xiѤլdG`Cv
@@wƨFM`Aoǫij{ѦU@Բ sC
@@oHGuڭ̷|Ҽ{oǫijp[jbaoͫҹI@ tCIAHFPﵽwMNѵتCv
@@oHjաGu۱qoŧQjHjAw`ߪkMF POﵽwCv
@@LɥRA@ӥѫOwv⪺u@pեtdwoDZIC
@@bLhƤAFXF@tCﵽ¦ӷ~ӦtwM NѪIC
@@bߪk譱AFpXjw]ӷ~Bҡ^ҪAνd¦ ӷ~ӦtAHKﵽoǼӦt˸mγ]ơBqDBiXqDMܤ cC
@@oHGuھڲ{w]ӷ~Bҡ^ҹӷ~ӦtWwA¦ ӷ~ӦtW]˸mγ]ơAHΧﵽ䨫qDBiXqDMܤcC
@@LGukioXܡAWwtdHh̷ӷҭquhﵽ IAkҲ{ɦbqCv
@@bFI譱A@ӥѤuȧBBBΦtpBҤuBBqu{pH
ΨⶡɭιqӿӨ|Nզu@pաANפΧq ɪwXijAç@XiʡC
@@ܩNѤ譱ABwߤ@YաAtdBoi
wϬʡAH[jШ|Mpô|HhAL̹w{ѡC
@@~AB|@ӡuwjϡvpCwjϱNeu wȹMUVǻwTC
@@ϬF~ʴjNѡAwNO@EEKE E~ץDnŶǹBʪ䤤@ӥDDC
@@oHɥRGuu@pձN~twAPϦU
iŧQjHjլde|̫iѤҴUijCv
D@@EEC~b~gٳi @@@
@@HU]gưȧg٤Rҵo@EEC~Wb~gٱpΤ@E EC~aͲ`Ⱥ[wqnG
I С
@ھڤ@EEC~KgٹwץAwpaͲ`ȹWb
IA@EE~ҹw]q^Wʤ|IEC
@@EEC~Wb~A䪺gټWi@B[֡CĤGuaͲȹw
|ʤܦʤIWCoӼWTiĤ@uʤI@
WTC@EE~~|uWvOʤ|Bʤ|IBʤ IGMʤICCYLhXujl{AרObXf譱 ﵽAaͲȼWiwΡC
@骺gټWDnOѮݨDұaʡCѩγ]ƻݨDjjA
[WpcM糡Ӧtؿvʿn}iA}w|ۼWC HӤHfWBJíwWɡAHγҤuqAwO}
|kC
@f~Xfe{M۹íwA~Ub~{iy^ɡCS
OO驹ꤺa]a^Xff|i@BWɡAӿ驹ꪺXf f۪WCHӥyql~ݨDvWɡAs[YBxW MꪺXfi_dCOAXfWMi۹jlA HΦۤCHӪFȳfSȩұaӪQvTCPɶAAȥXfWh
w|C
@HӭgټWi@B[֡AҤuwCgu`ʽվ㪺~
vi@BAѲĤ@uʤGIUܲĤGuʤGI|CN~ vhbĤ@uʤ@I@CAHβĤGuʤ@ITC¾ ůʼƥؤjTWɡAӦJ禳ۼWTC
@OƭpA@EEC~OqȥѦʤCUլ IC~CӤ뤺AWTʤA@EE~ Oƥ笰ʤCMaqObӼƭӤ뤴iW[Aif 譱qȫhiOũMCӤBuҤަܵWݼȮɩʡC ӨA~qȹwLVUժlaC
~T ССС
D@@EEC~Wb~fXf{MbA@EEC~ӤWb~ AXfWTuʤkAP@EE~Ub~ɴTۦPC bXffȤA@EEC~Wb~ffȹW[ʤCAWt h~Ub~ʤKWTyCA䲣~Xffȶi@BU^A~Wb ~^TʤGACh~Ub~ʤE^TC
D@@EEC~Wb~AXf{MhQ]xZCjlA dzFXffb@ɥvOC~A饻gټWwAH
|W[P|vA֤F饻ifݨDC^ꪺifݨDwAoiO ]eֿnFjqsfӻ~@XվҦܡCbyql~IhPv TUAs[YifݨDjPhzCWzغح]~A䪺Xf~ VTA]OXfWw]@CLAPLA XfΤj{Ϊ{C
D@@EEC~Wb~iffȤ@~eWʤCA@EE ~Ub~ʤWT֡CWtץ[֡ADnObaݨDjj pUAdζiff~Wb~HpAjlWɦʤCkAӤ@~e hU^ʤ@CѩiffȼWtXffȬ֡A@EEC~Wb~ ζTtBX{EʤQrA۵iffȪʤQGIA@
EE~P۹ƦrOKʥ|QΦʤQ@I|CζTr XjADnO쥻aEWΨޭPꥻflǶqW[ұaʡC
D@PW~A@EEC~Ĥ@uAȿXοJWvʤ ΦʤCAөuoLζTվlTʻCѩTMLP
Tӷ~AȫWɡALζTbĤGu|~i[վlC
aݨD ССССС
D@O}WɡA@EEC~Wb~sq@~eW[ʤTI
|AӤ@EE~Ub~WThʤGICCsWɪpbĤGuS OAoPW~PʤI@ɴTAӲĤ@uɴThʤ GCTM]_b@EEC~Wb~PqAW~OۤWɤFʤ TQIGMʤQIGC
D@@EEC~Wb~A}jlCγ]Ƥ譱A@EEE C~Wb~dζifꥻfAHpA@~eEWʤGQTF Ӥ@EE~ȤWɦʤ@CӦtΫس]譱ApcӦtؿvʦb ƤjT^ɡAP~DZͶ՝ڦXC@ЫέpUu{][ֶi Ct@譱Aѩ֤߭pؤwA糡gu{ hҩwC
~ ССС
D@v~b@EEC~Wb~jɶZA]OήaΧ
ݨDӵuCgLDĤ@uAb|Τ첤 dTCLAb멳Τ몺jɶARADC멳 ɡAѩpFĨIHíwv~ΪajqW[v Av~DAͲHRC
D@@EEC~ĤGuAYzjέbAIJĤ@uWɦʤ
QTAP@~eAhXʤ|QKC쯲WɳtרS ֡A@EEC~ĤGuĤ@uWɦʤAP@~eAhW
ʤQ|C
D@@EEC~Wb~AgrӾP⥫QDCbgٮiΤΧ W[pUABDnӷ~ϤΨLKQaIүŤΤAżgrӡA R次ʴ_dCܩE譱Abs~ȫWpUAP⥫[ ӯȥiaíC]~ͲuǾEivTCu~ӦtM MbCshγ~u~ӦtݨDoy^ɡALoPgrӪݨD_d C
D@v~poijTW[A@EEC~ӤP@~eA ƥحpAW[ʤTʹsKAӫӭέnpAhW[ʤG
ʤTQ|CoܥӼƦ~svq|RΡCPɡAu~ӦtΡu LvOӦtpoiҼW[Aӷ~ӦthiU^C
ķ~ СС
D@@EEC~Wb~ĥD`DAѲSOZAڥͫ
b|uȦ^AbӤзsA@EEC~Wb~pAڥͫ ƤWɦʤQTAɴT饻BDwέ^ꪺѻƧ֡AP ƪɴTCCFȳfɤηaѥUvTAaѲbC ΤKgjiʡC
D@boqA@OíwC䤸HILDnf
աAT[vƦb@EEC~Wb~Wɦʤ@I|CCΤKA ~ubpôײvj@AoqFȳfɼvTC
D@ϥΪUڥHγftWɡCϬMѥM~DZA @EEC~Wb~APľcMѲgUڡBvUڡAHΩP ӦtBس]Ϊ~oiUڼWTLOUڨtC䤸sڥֳtWA bsBҦҦ]ӤWɡCĩM~MZAϬMb汵e ﭻg٪HߡC
Ҥu ССС
D@HӸg٥[ּWAҤupb@EEC~Wb~C gu`ʽվ㪺~vUAѲĤ@uʤGIU^ܲĤGuʤ
GI|CN~vBCFĤ@uʤ@I@βĤGuʤ@ ITC~AĤGuu@ɶN~HfvW@uC
D@N~pbDnAȦ~~X{jlWCѩ糡Ψpc ӦtؿvʼW[AӦtΫس]u{aLN~HƫۤWɡCۤϡA ҤuK{װͲu~ҥ~iAasy~N~Hƫ ֡Ct~AUDn~¾ůʼƦrjT^ɡC
D@լdDn~JAHfpAMi@BjTW[A ~۪WTCҦDn~XpAN~Hh~p⪺ JAHfpA@EEC~Ĥ@uP@~eAWɦʤEAӹWT hʤTCܩu譱AHfpA@EEC~TPh~A uꥭWɦʤAܰʤjC
qf ССС
D@@EEC~Wb~OqȤũMCDngtCq ȡBjlAHΥ@ɰӫ~洶MnAUifqȡCӥa ͪqOOwMC@EEC~Wb~OqȯSIAO~ íwApHЫίMqOPW~PɴTCAƦܤ@ǮO~MA Ȫ]UC
D@PW~PAOƦb@EEC~Wb~Wɦʤ IEA@EE~Wb~ʤITɴTCA@EE~ Ub~ʤICɴTy֡CXTӫƭpA@EEC~Wb~X OƥWɦʤIEAoӤɴT@EE~Wb~ʤ IKjCAӻP@EE~Ub~oɴTۦPC
̷sqw ССССС
D@ھڥHkA@EEC~aͲ`ȤλwwgNӧO] @XqA̷swnC
D@~T譱A@EEC~wfXfWvѸɹw ʤCIGUզܦʤIKCbXfAwfWvʤ KAӸɹwWvʤKIAoDnOѩ@EEC~~쪺W wCҭPAMĤGu禳ǼWAwaXfWNѸew U^ʤ@վܹsWCӤΤC몺aXf{]X{ũMW C
D@i楼ӡAXfbUb~|n{CHӤaXffۦ^
ɡA驹aXff|[tWCHӬJfíwݨDAw驹
Xf|Oi[WCѩyql~ݨDv_dAӴXӤ뭻驹
s[YBxWΫnXfiﵽCLAhQ]iऴ|ӭ XfWC@EEC~Ub~A۹jlN~vTXfv
OChӪFȳfۤCjTSȥ|CgtӪJfݨDC Y]FFδMCgټWvTAڬwpJfݨDiO MC
D@w@EEC~iff~WvNѸɹwpʤKIGվ
ܦʤKI|CfTWLwNQdζiffּWFd ifWAѸɹwʤCITդɦܦʤEIGCdζiff WɥPaݨDjlp۲šC
D@@EEC~XfAȹWѸɹwʤCIUզܦ AVUվDnO]@EEC~Wb~wCWҭPCP [pۤϡAĤGuȹC~譱{wtCLAb@EEC~Ub~ XȫȤHƱN^_`WCѩB譱íB^ɻPΥ]A]gBM~P LӥΪAȿXi@BWATWNi~ﵽAȿXC
D@PɡAw@EEC~JfAȹWvAѸɪʤ UզܦʤIAHϬMwCWC
D@aݨD譱A@EEC~wpHO}Wbʤ IܡCONSOOϬMbO~WOkCӴN~p}
nήaxJW|~MOݨDCӬ۹ũMq| ʶROC~AӦtJW[N~ʸmíѥΫ~Φ@ήO f~NC
D@wFO}b@EEC~bʤWC
D@ӤϬMg٧}䪺aTwꥻΦ`BWAwpb@EE
C~NʤQTI|WAɹwʤQIT֡C
D@HDnզpAwpcӦtΫس]}WvN ɹwʤEIհܦʤQGCoOѩpcس]ʽk γ̪سyPNѤjqW[ҭPCPɡA]@EEC~Wb~~qjT W[AwgaμӦtOμWTѸɹwʤGQW
Aհܦʤ|QCHӨpcؿvqW[AwaoiӪڤ QNX{ּWAFʤQAɹwʤQG֡C
D@t@譱AcbӦtΫس]譱}WNCAWѸ ɹwʤTէCܦʤ@ICM֤߭phu{vB uA@Ыέpس]u{N~jlW[C
D@XpΤcӬݡA@EEC~ӦtΫس]}䪺WvN ѸɹwʤI[֦ܦʤCIGC
D@γ]ƶ}b@EEC~WvNѸɹwʤQ @հܦʤQTIKCѩDnؤu{Kmθ˳ơA cΦbγ]ƤW}wWvNbʤTQܡCpc Φbγ]ƤW}䪺wWvѦʤQհܦʤQTAW[ ]Oѩjqb줽dz]ƤΤu~Ϋس]]IҭPC
D@ӻAw@EEC~aͲ`ȪWNbʤ IADnӦۥaݨDjlҭPAӥXf{hũMC
D@bOqȤ譱Aw@EEC~OƥѦʤCU զܦʤIC@EEC~CӤ몺OƥWTuʤ CCƼWܦʤIDnO]ѫBOɤɡC
_ɡA|^ܥ`Ct@譱AaͳqONӹBO ΦbEW[Ϊ~vBaíӼW[CӨA@EEC~qȼƦr LVUվ㪺laC
@@@@@@@@@@EEC~TQ@@@EEC~KGQE @@@@@@@@@@EEC~w@@@@qw @@@@@@@@@@@]ʤ^@@@@@@@@]ʤ^
WvG ССССС
pHO}@@@@@@@@@D@@@@@@@@@@D FO}@@@@@@@@@@@@@@@@@@@@@ aTwꥻΦߡ@@@@@D@@@@@@@@@D @gaμӦtOΡ@@@@@@@@@@@@@@ @ӦtΫس]@@@@@@@@@D@@@@@@@@@@D @@@@@@@@@@@@@@@@@@@@@@@@@D @@p@@@@@@@@@@@D@@@@@@@@@ @aoiӪQ@@@@@@@@@@@@@@@@ @γ]ơ@@@@@@@@D@@@@@@@@@D @@@@@@@@@@@@@@@@@@@@@@@ @@p@@@@@@@@@@@@@@@@@@@@@ fXf@@@@@@@@@@D@@@@@@@@@@D @a~Xf@@@@@@@Т@@@@@@@@@@@@ @f@@@@@@@@@@@@D@@@@@@@@@@D fif@@@@@@@@@@@D@@@@@@@@@@D XfAȡ@@@@@@@@@@D@@@@@@@@@@D JfAȡ@@@@@@@@@@D@@@@@@@@@@D aͲȡ@@@@@@@@@D@@@@@@@@@@D HfpaͲ`ȡ@D@@@@@@@@@@D
HɻpWvG СССССССССС
aͲȡ@@@@@@@@@@@@@@@@@@@@@ HfpaͲȡ@@@@@@@@@@@@@@@
Wv СС
Ͳ`ȥơ@@@@D@@@@@@@@@@D aݨDơ@@@@D@@@@@@@@@@D Oơ@@@@@@@@D@@@@@@@@@@D
@@m@EEC~b~gٳinbUPG]EG^_bDFXp CyaUFZPBoACQGC
D@pi[ֵoXJ @@@
@@uȧNU_i@Ӥ몺pAUpHoiӥ[t ήɶAqӥ[ֵoXvӦtJȡC
@@uȧoH]P^AѤUP@]E@^}lAbq ioipoiӡANiHܸuΦXӫذӶiUCγba qd~ӻPoipȤu{G
]@^餽@ƤƦètΡF
]G^سyXJfqDέɨlH|F
]T^ѨѤtΪfC
@@{ɡApHoiphP@ƤƦètΪ鶷Ѵȸpi AhѵoiӭtdCPˡAPF`sѤ]I綷Ѥȸp ų]AoiӭtdC
@@~AoiӸg`iݭnoipسysXJfqDAΪ
ئ]ؼӦӷl۳sH|MqDC{ɬOѸFpiWzu{ӥ oiӭtdC
@@oHXAspiHoiӧĦau{Aåiﵽ~ oipwMipA]ӥiHپؿvɶCaoiɹwpo uʪsߡAiHOoJȪɶFӤC
@@pGܷskAoiӥѻ{iHhNAN|tdiiʬsB б\iҡBPFΤΨƷ~cաBHήھڬJwзǺʷa Lu{C
@@uAN|iNf֡AHTOu{FFзǩMn DC
@@Ӥb@EEK~G멡ɡAFN|˰QӭpAMMw O_ʦaIC
@@{iHhεUcu{vAHΦaس]ӷ|wQԸߡAêܤ pCuȧwWPoHO@dKʦWHhξcAipC
D@¯l[j`gBʲĤ@qUP @@@
@@¯l[j`gBʲĤ@qNE뤻顣PAqH QGܤQEHhC
@@pPиӦ~ֲէOӱqLĤG¯l[jgHhAɧ֦b UPeg¯ḽ]C
@@poH顣PGuӹBʦۤCi}HӡAiiQA ǤMCv
@@uثeAFTQ|UC֦~wg¯l[j`gAĤ@q HʤQKICCv
@@LXAĤGqNEK顣P@}lAH~֤@ܤQ@
ൣCp|~֤@ܤൣHΤܤQ@pǥͱ¯l `g@XPwơC
@@Z@ܤൣAq¯lgΥuL@gAiE KܤQ@QaL̫e`gC
@@pݤUQTqEEҩM|QEd|ѧKO` gCӲէOww{woC
@@ܩܤQ@δNŪpǪǥ͡ApbEܤQ@|e ݤpǶi`gC
@@~Ai۶OepaͶEұ`gC
@@pdߡAiPq¯luGGKTT@s@@@C
D@D]DkήȫȳQP}EӤ @@@
@@JҳBoH]P^٤@W]kM^qޤu]Dk
EWڰZyMyȫȡAbϵPk|P@ʸTEӤC
@@ӦWQTQiGQKӻ{EΤiXkΪH oCCoQPJEӤAPC
@@ܩEWyMyȫȡACHQ@oJҳBBӱ oCKWyQiOPJ@ӤAwDܤJQGӤCӸӦWy QihQPʤ@ӤAwQKӤC
@@ƵoWP]KGQG^AJҳB¾b@ϫDkҤuʤA {Nmo{ӤEWȫȡAb]kM^hBq樮sC uMEWȫȥQ뮷@i@BլdC
@@լdұoAӤKWyȫȤOb@EE~Q@EEC~C L̹O~dѤ@ӤܤGQGӤCӦWyȫȩMޤuO˻YCLO bKӴȦArdܥTQ@C
@@KWyQiӻ{DۤvȫȨOiHbu@CӦWޤu ΥL̰uCCuS@ʦܤGʤ~AKHt~@io@d@ʤCӸ WyQihio@duSC
@@ӦWޤuӻ{DEHҬOȫȨAoMΥL̡CLèSd֥L ҩC
@@JҳBoHĵiAHhpΤiXkΪHAݹHkA̰@ ڬTQUΤJT~C
@@JҳBoHXAҦȫȡALר~P_AbJҳBBe
oqƥĤu@AHϳrdHhA|D˱A̰@ڬU J~C
D@֤߭pN䪺ζH @@@
@@{ɥߪk|]ȩe|DuLβzij]P^ܡA֤߭p Үi{M~ǩMV~AF@ȤӰϰؤu{AȤߪ HC
@@ѩLβz]ƯʮuAL{ɥߪk|PBNLXuDC FuXȤ߶}§AåNLPC
@@Lβz١Ab֤߭pQӶؤAw䤤KAӥBO bwOΤɧC֤߭pҨoZAwO]թ κzjصoiu{ĹoAC
@@LβzGu\h~cA]AFBӷ~BTBM~MdzNU譱 ´AXݥAHAѤΤɧڭ̦bzeju{p譱 ogCv
@@L١GubӤQܤGQ~AȤӰϩұ檺صoipA`ȱNF @UdCڬ۫Hӧڭ̱q֤߭pҨVMѩMޯA 䪺u{ɩwibo@MüCv
@@Lܾ֤߭pwBէCC@EE|~@AwB
ѭӪ@dʥ|QէCܤ@dʤKQGA@EE~Q
ӼBi@Bdܤ@dʤQ|C
@@LβzGu@{ɥߪk|]ȩe|DuA[W۾֤߭pb@E E@~i}HӡAڤ@HߪkijAѻP䤤Aظ@譱 {pXAڹbnVҦѻPou@HhAPHJߪPCv
@@LGu֤߭p{wiJ̫ᶥqCƱU~OLҳ yZAbw⦨ɧsξKoӾlUءCv
@@uȧK~ͥbD§PɪܡACFuXȤߥnNڭ̹ ҦgѻPFuWΫسyu@ؿvvBu{vBUݤHBӫذӡBuH άFHRC
@@LGuCFu{wXлxAXȤߥ紣ѤF@ӦQ mA[ojس]Cv
@@su{wpb_C׳B]ߤFCFuXȤߤάsF[ xCӸpŤE]ߤF֤߭piߡC
@@su{wppLܡAXȤߤ[xAiM YCFuRAiL̥RFѦbFuسyκL{A ҹJ쪺UذDԡC
@@XȤ߳]AiQΤ@ڤheC
@@XȤ߰FiXҫιϤ~AٮiX@ǥΨӿطFuơAҦp lC~Aߤٳ]mMqCXȹCFu{ѵ{סC bߥ~\FCj@qDlѹCH[C
@@CFuXȤߡA{w}[A}ɶP@ܤWQ ܤUȤɡAPBΤWQɦܤUȤɤTQC߳{PT
𮧡AY鬰Ahӱ}C~Aߥ|tϸBs~ As~𮧡CXȤߤJOΥKC
@@CFu[xh~}C}ɶPܤWCɦܱߤWQɤT QAPΤWCɦܲݤ@ɤTQC
@@@q譱Auڤh樫KaKPXȤߡAAȮɶ P@ܤѦWEɤTQܤUȤɡAPBΤѦWE TQܤUȤɤTQC
@@XȤ߬d߹qܡGG|E@KGC
D@ʤupѪNƧѿZ˳ @@@
@@F˳]P^Zn@NƧѿAqھګؿvҦVؿv ưȺʷҶ檺ʤupѪԱC
@@FoHAؿvu{MDu{wިAؿvM~Hh VؿvưȺʷʤupѫ~ii}u{C
@@oHGu|bCؿvu{MDu{MIAqӴCu{ aLuHBaLHhMFؿvBcMgaˮ`Cv
@@ؿvu{]AسyBaLBgaɴBaBBʤΥ[ؤu{A ӵDu{h]AسyBξQ]paDγqDC
@@ƧѿqFaLwz[cADnƶ]AG
]^@bرpUiؿvu{εDu{ʤupѡF
]^@ʤupѪ{ǡBɶBǩMpѪΦΤeF
]^@ؿvưȺʷbҼ{FSwؿvu{MDu{ʡBUʷŧO һݪHOMʤuAUؿvu{MDu{TwAʷŧOF
]^@TOaLwz[cBz[cC@զһݪHOBA¾ θgAHκz[cC@զGSwȡF
]^@Swu@sƺʤupѪk]䤤nNaLMu{MI{ת ǤJҼ{^BIukzAHFwiu{تAMJAIw MO@IF
]^@bرpUNLʤupѧ@XƫqAHΦij ιڰʤupѩүAΪ{ǡC
@@oHGub~yɶou@uhAN|CXYؿvu{ε
Du{ݩOԲӷǫhMkCbquhɡAN|Ը߫ؿv~Cv
@@p{iHhBUcu{vεUӫذӥǤWUC~AK| BA]A̰@ڤGQUG
]^@sƪʤupѤŦXҪDnWwF
]^@𦸻sƤŦXҳWwʤupѡF
]^@bSXz]UAe\ιڤWʤupѪeDn C
@@oHAسy~鬡ʩʤ|]NƧѿWwӦ}vTA] ijiOؿvaLnwзǡAåiַN~ƥةMlu@ ơAqӹ綠MؿvuHһtqC
@@wԸߤFgaΫس]Ըߩe|Ψس]pթe|B{iHhεU
cu{ve|Bسyӷ|Φaس]ӷ|CҦ쪺NMijbN ƧѿwɤwҼ{C
@@ӧNƧѿN@EEC~ETV{ɥߪk|Aùwp|b~ ѳWҦaFw_ͮġC
D@yݨDP @@@@
@@BpoHb^sDɬdߦO̩e|NpHvӦty DҵoiɻAiޭzpHvӦtݨDPέp rAOK۹Bp@EE~uyݨDsivFӳiR
@EE|~T몺pC
@@bsiAFߤF@ӥѷɰƹBqDzu@p աAtdwκʹij污pC
@@oHGuھڤ@sܡAb@EE~QGɡAv 쪺PݨDOW[ܤGQEUӤΤGQEU@dӡCv
@@u]AH`ƨӬݡAv쪺ѨDOthŪCv
@@uLAڭ̥窾xӧOaϦuʪpASOOqFϡBԩM oyϡCFwקﭻWзǻPǫhwﴣѦv쪺ޡAb
uʱpX{aϡAWwݭnѪvƥرN|W[Cv
@@uO̩e|iNO`DX@tCijABp惡 wCv
@@ܩbiĤGIqҴΪDAoHjաAۤ@EK@~_AF SbѪy譱@XC
D@OpayŧO @@@@
@@ҫO@p]Op^]P^ay̷sʹGAa HhΥDayC
@@Opbau{PayŧOAHtXӸpCgʹay誺 IC
@@Opھںʹpұojzƾڳ̷sͶաAayw| ŧOC
@@TQCӪaywGGCӤu}nv]@š^AQӤu@
v]Gš^AQGӤuΡv]Tš^AHΨӤutv]|š^C
@@u@švay]AG
@@LW]^@@@@@@@ĪŽ]^@@@@@@@ @@nW]^@@@@@@@@HW]^@@ @@FWy]^@@@@@@C]^@@@@@@@ @@xtݡ]^
@@uGšvay]AG
@@娤]^@@@@@@@FUy@@@@@@@@@@@@ @@`W]^@@@@@@@rW@ @@W]^@@@@@@@@[W]^@@@@@@@@ @@LW]^@@@@@@@֡]^@@@@@@@@ @@ۿD]^@@@@@@@@D]^@ @@thW]^@@@@@wFW]^@@@ @@tIW]^@@@@@@@MWĤ@y]^ @@Wy]^@@@@@@TPW]^
@@uTšvay]AG
@@jW]^@@@@@@@WFW]^ @@ȐW]^@@@@@@@©@W @@MWĤGy]^@@@@s@W]^@@@@@@ @@ȽuW]^@@@@@@@ay]^ @@W@@@@@@@@@@[hQW]^ @@RW]^@@@@@@@W]^@@ @@@@@@@@@@@@@
@@u|švay]AG
@@W]^@@@@@@@PW@@@@@@@
@@ƵG@@@D˳ay @@@@@]^@w]mTay
@@nWΪFWyѡuGšvରu@švFWBWβMW
@yѡuTšvରuGšvFȐWBWRWѡu|švରuTšvF MWĤGyѡuGšvରuTšvCoǪay誺ܤ@ݪayӵߤ 誺ܰʡC
@@@ӻAܦhaybjBιL|ŧOҪܪ謰 VCҥHaקKbɩΤjB᪺ƤѫeayaASOOuTšvM
u|švayCOpAu|švayq`bɭԧyaC
@@ثeAھڤ@EE~ayʹƾڦӾ˳ay WBWBŤEBCsWΥۿDyC
D@ȸpiu{ﵽsɰϨѤt @@@@
@@ȸpN~bsɶihu{AHﵽatΡC
@@u{NQGi}AbԿزĤGۧtwAHﵽ _ܤԪC
@@ĤGۧtwxqNFTUCdߤ̡C
@@u{]Aų]ޤαƤޡC
@@u{GQ@Ӥ맹CɡAۧtwNiI٪_@a
ܤϩGss|~CEUCdߤ̪ݨDC
@@~Aȸp|bWtsسy@өwAaGdEʦW ѭC
@@ثeMtsuϥηˤΤC
@@Ӹp|bMyXMtsų]GIA|Ѥ@ʤQܤTʲ@̪ ޡC
@@Wzu{NQGi}Awp@~Cu{OMyXĤ@u{
p@AN|MyXmXiϪ~ѭC
D@FFΤjĮ[toiiUݬs @@@@
@@ݮip]P^eUUݤqN[t_jsFFΤjĮoiAi iʬsC
@@ݮipoHGutXFWPgaHW[ЫΨpAڭ̫ij [֪FFΤjĮoitסANlUoipѤTאּCv
@@LGuĤ@oipOQ֤ߤu{@A{wjPAӲĤG u{wi}AùwpbGssG~Cv
@@LGuӨoiieǤKUKdHfCv
@@LGuIΪЫλݨDAڭ̻{ݭnNlUoiѤT אּiCv
@@oHGuĤToibGss~AHfؼбNѭQG
UWܤGQ@UdAӲĥ|bGs@@~oiAHfhѭp GQ@UWܤTQGUCv
@@LGuUݻݴNooipd@XijAHtXsqHf СCv
@@sرN]AWBu{BҡBBBqBȤΦa赥dC
@@Uݨ÷|s@ѪFFܩW@C[γ~QuiʡC
@@UݬsXѩݮipqqݮiBBijθUu {UݦqNñqC
D@`ʯfji @@@@
@@@ӥ[jʶǼef]ʯf^{ѤιwjiѤ]P
^_ܤE멳|C
@@jiяp|ͬDCӬ쪺Dnu@OwBMv fC
@@@EEC~ĤGuA|ͬ촿Bzd@ʤKQKvʯfPVӮסAP h~PdsTQGvAWɦʤTI@CPVʯfHhj~
CHC~֤GGQܥ|QfHPVӮ`ƦʤQ|FkʻPk Ҭ@IC@C
@@ҦDEPVʯfӮפArڼƦrPVӮת ơAHʤpɴTO̤jC~ĤGurӮצQvAh~ PhuTQ@vC
@@jipҦ|ͬEҡBaߩMUCΐh|G
QFh@@@KGQEܤE|
Rh@@@E|ܤQ өMh@@@EQܤQ oh@@@EQܤGQG
@@wʯfsŶǮMŶǥdNKOoAL̥Tϥ wMMקKWL@ʦQOwʯf̭nkC
@@iPqRuGCKs@GG@@ΩʳդhuGTTC@G@G @AdߦʯfơC
D@@EE~~gٲέpiX @@@@
FέpBss@EE~~gٲέpլdi{w}oA] AG
@@EE~u~Ͳ~έpլdi (|Q)F @@EE~ΦtؿvBسyΦa~~έpլdi @@@@@ (GQ)F @@EE~oBsBifPXfTBvΰs~έpլd@@@@@
i*((|QK)F
- @EE~BΦAȫ~έpլdi (GQG)F
@@EE~ܮwBqTB]ȡBOIΰӥΪAȫ~έpլdi @(TQ)C
WziHB^ӧΦXAChέpơAܤ@EE~ U~cθgSAoǸƬOq~cjo C
iέpƥ]AUC :
- cƥءBHơF
- ~SF
- ͲȡBPfBB~ȦqΨLJF
- W[ȡ]ΥHq糧aͲ`Ȫ^F
- ʤJf~έƪ`ȡF
- LB}F
- Tw겣RbȡC
i@EE~έpƦr~A٦@EETΤ@EE|~έpK nAHKC
oDzέpƦrFΨpHcbwFΨM譱AQΡC
WzibDQDFXpCyaUFsDBF ZPBoAibWJWDQGWJFjӤQEӬFέp BZXʱoC
D@EC~CfέpƦr @@@@
ĺz]P^oέpƦrܡAsڤξU MԴڪWtצbEC~CiwC@CXCKnƦrH LhƤ몺ƦrC
s
sڪɴTѤʤ@I@wܤCʤsIC sڤWɡADnO]䤸sڼW[ʤ@IKAPF~sڦʤ@
I|^TC
䤸sڸgLU^ʤGICAbCjTWɦʤ|
I@AөwsڪɶիA~WɦʤTI|AbCAW ʤTCt@譱AxWsکWɦʤ@IEAbCU^ GI@CwsڤWɡAO]ȦP~vAȦհws ڧQvAHlǴ䤸ҭPC
~s~Uʤ@IGAbCLɦʤsIA D~sګhjTU^ʤTI@AӤ^ThʤsI CD~sڤU^ADnOѩjաAϸ_䤸IL~ ײvWɦӲͪȮҤޭPC
UڤιԴ
CvٶUکMԴ`BU^ʤsIAӤhWɦʤG
I|CaHUWtשLh|ӤCܤCʤ@ITC ]OTĸUکMLaUڪWbCiwCt@譱A~U ~WW[ʤTITAbCU^ʤGIC
HfRAC䤸UڤWɦʤ@IEA~UګhU^ʤ GIGCѩ䤸UڪWt䤸sڲ֡A䤸UsvLɤQ@ ӦʤICbC멳ʤ@ʹsCICC
f
ѩ䤸sڪW[PFfʤGI^TA䤸f ۢbCWɦʤ@ICt@譱A䤸fۢۢb ChWɦʤ@ICCPW~PA䤸fۢWɦʤQ
|IEA䤸fۢWɦʤGQAӴ䤸fۢhW[ʤ
GQ|ICC
D@@EEC~C멳~xƼƦr @@@@
ĺz]ާ^餽AsPgabA@EEC ~C멳x~xƹFKʤ@QC]멳GKʤGQE^A C@ɲĤjC
C멳~װ~xƬʤQ@]멳GʤCQ ^AӤgah@ʤQ]멳G@ʤQT^C ~װ~xƻLU^AOu`ʦ]vTC
ާoHGuyqfb멳g@׳BA FC^_`AҥHڭ̦bCnʥάū^LѪȹC~Aѩ COFq~װ]FxƸh䤤@ӤA]ӥO~װ겣 Ҵ֡Cv
WzƦr]AܻXCsPXbA~װMga ~xƤOʤKQM@ʤQCC
~װ~겣 ]HQp^
@@@@@@@@]A@@@@@@@@@@@@@@]A @@@@@@@@@@@bB@@@
~@@@D@@@]D^@@@@D
~@@@D@@@@@С@@@@@@D
~@@@D@@@@D@@@@@D
~@@D@@@@D@@@@@D
~@@@D@@@@D@@@@@D
~@@@D@@@@D@@@@@D
~@@@D@@@@D@@@@@D
~@@D@@@@D@@@@@D
~@@@D@@@@D@@@@@D
~@@@D@@@@D@@@@@D
~@@@D@@@@D@@@@@D
~@@@D@@@@D@@@@@D
~@@@D@@@@D@@@@@D
~@@@D@@@@D@@@@@D
~@@@D@@@@D@@@@@D
Uaϥ~xƱƦW
D@@饻@@@@GdGʤGQ@@@@EC~C
D@@@@@@@dGʤQ@@@@EC~C
D@@xW@@@@KʤEQ@@@@@@EC~C
D@@w@@@@KʤQ@@@@@@EC~
D@@@@@@Kʤ@Q@@@@@ EC~C
@@@@s[Y@@@Kʤ@Q@@@@@@EC~
D@@@@@@Cʻ@@@@@@@@EC~
D@@Z@@@ʥ|Q@@@@@@EC~
D@@ڦ@@@@ʤKQ@@@@@@EC~
D@@NjQ@@@|ʤQ@@@@@@EC~
ƨӷG@ĺzBڳf´]ڪIJέpZ]ע ^^Bz
D@lFpoSOl@ȷ|ij @@@@
@@pzlFppu]P^ťA@MH@EEC~@ɻȦ
ڳf´~|DSOlAN~EGQ@]P^oC
@@oMlO~EGQTܤGQb|檺@EEC~@
Ȧڳf´zƷ|~|ClLYǫPϭbȬwڪ ĩMAȤߨ⪺~AOOG@Gl]ĩMȦ~^BG l]Ҩ^BT@l]TMqT~^Ml]ةM B~^C
@@uGuoMlHLILNLsCsLkOϹ
MAOΧ@LslFӤ|ޤJCiGQTBSϴT²Z lClѰs]pBϢТޢ]Ѣ^ LsCv
@@UClFNѩ]P^_iXoǶlѥwGlF`By
FClFBWlFΨFжlFCҦlF|o⭺ʡAC @C
@@ѩ_ܤE뤭]P^AҦlFwqlBw\P ʩMMPAOKCqʼƶq̤֬MlΤӤw\PʡA]W CiѤQQT_eqʪlFҭql~C
@@t@譱A@M]A|حȶlMPNEGQ@bUlFo ACMGQCiQΡuwql~AȡvwqʡC
@@sloACH̦hiʶRQi]YGʤQT^P@ȪlM ӮMPC
@@uܡJuUlFo歺駡]Yɻ\LAȡAiaƭ
ʩΦ۳ƫHʡA\WL\LCt~A@ӯSOlW|PɱXC
ӤGQGӶld^|ѽsբޢlW\LAȡCv
@@ҦlFEGQ@|ӱ`uAuɶѤWȤKɦܤUȥ|ɡF L骺AȥuoslMBzlC
@@PɡAFWDK@@ӪlթWȤKɦܤUȥ|ɱN|
\PʡA\LO@Ӧ|лxlWC
D@puͤ~i_o @@@@
@@pdШ|ժGQ|pɹqܸTAȡAECsM Du~i_o֡vAuXGKTT@s@@@Aw參PqťC
@@u~i_o֡vOĥΥͰʪs@ΦA襤~HMo ~ѡAøԲӸ~Ho֪]OѩsN´CιBʶq֡A
ݭnӪK|CAYϫOHߺDA|ϹLѪqn E_ӡAΦתաC~AɶɭOɭPέDDn]C
@@MDöi@BXpidͬҦAjէŪΫHڹB ʪnʡAåBij֦צhקKYתթMLAo˫KiĦa
CέD|ιw]έDӤް_ŦfBο}fefC
@@~AuCvѡu¯lѡvΡu¯ḽ][jgBʡv ^ơAHΦUϪ`gߪa}BqܩM}ɶ^Ϥ uAѥܡC
FD06133 | 1997_港澳台_香港_政府新闻公报_嘉利大厦大火调查委员会最后报告书.md
分类:06_境外及港澳台调查报告 | 年份:1997 | 地域:香港 | 严重程度: | 场所: | 起火原因: | 来源格式:md
香港政府新聞公報:嘉利大廈大火調查委員會最後報告書
sD
SOFϬFsDBXDDQjHܤK
qܡGGK|G@KCCC
@EEC~KGQE]P^
@D@]FqqDwX @D@pz]FqqPsDɽ @D@FMߧﵽw @D@@EEC~b~gٳi @D@pi[ֵoXJ @D@¯l[jgBʲĤ@qUP @D@D]DkήȫȳQP}EӤ @D@֤߭pN䪺ζH @D@ʤupѪNƧѿZ˳ D@yݨDP D@OpayŧO D@ȸpiu{ﵽsɰϨѤt D@FFΤjĮ[toiiUݬs D@ʯfji D@@EE~~gٲέpiX D@EC~CfέpƦr D@@EEC~C멳~xƼƦr
D@lFpoSOl@ȷ|ij D@puͤ~i_o
D@]FqqDwX @@@
@@]Fqqv觹DwxXݦ{̫@СоC
@@L]P^|hQȬ٬٪²ǼwM]FݦhCu~U
vMwCߤWALXuȬwǷ|DȤߥD쪺߮bA÷|hjqF `C
@@]Fqq`xXݿDwɻGuXݪȡAOVDw|B ӬɻSάFxAѭbC@^k̷spĤ@ơCv
@@vGuڦbaPҦIJH͡AϥL̷P쭻y@p `zCqL̪Aڻ{ڤwjjWjDw̹ﭻ䪺HߡCv
@@vܡALPhCu~UΨLx|ͫܦGC
@@LGubu~NMhCoiWܦhaݭnDzߡAڧƱ死 bo譱PDwHh洫߱oCv
@@XݪAvexMԡCFP`z|~ALٻPh
DnBzuөMĨưȪFx|AõoFTDDtC
@@vNKTQ@]P^ߪC
D@pz]FqqPsDɽ @@@
@@HUpz]FqqKӤ]P^UȦbF`PsDɽ 峡G
]FqqGQM骺ѥjiʡAް_֤HhCO @ƱnOoAOѥuOڭ̸g䤤@ӡCڭ̤wF@
EEC~Wb~g٪pΧڭ~Ҧp~g٪p|íaW
AWvOʤICbopUAMѥiʡAڭıo|vT 쭻g٪աAt~@Iڭ̥iHݨ쪺AOMbo骺iʤAѥ ROܦǩMZAopҩMҺʹѥצܦn
zCMA@ڪĤߡAbڭ̥|PѥĦiʪpUA vTӪiʬOiHzѪC
O̡G䩲O_ݭnIíwH
]FqqGڭ~wLA̭nOݥB@O_ܦǩMZCt @譱Aڭ̪gٰլO_íAJMoǵץOܡAF ĨFqzwC
O̡G۴Ѥw^F@U|dIANӪѥUP@iA^AA̷|_ i@BIKKH
]FqqGѥiʡAڬ۫HAbujaӦ]oӱpAӱ FIA]o˰kOA̭nOB@O_`BǩMZ C
O̡GK͡AͤwLܭȱohQQAڭ̦ojxơAO_Ҽ{ @½ô䤸A٬OyΨӺݭnAܦhͪưȡHI ӫˡH
]FqqGڭxƪDAڭ̥naҼ{AҼ{ɡAM
|C
O̡G]FxƤ֤FQGA]OH
]FqqGAO]FxƤ֤FQGA]FxƨèS֡Aڬ۫HA AOާ褽~xƪơC~xƪƷMObPɶ
|ҤPAڬ۫HL̤wLFĴpAb@~FJMX
AҦpA@ܥ|몺JXjFCɬOXjJCҥHb @qɶӻA~xƨǷLܰʬOܥ`ƱCh¤jaC
D@FMߧﵽw @@@
@@SϬFoH]P^ܡAFxP°k|^kxkx
J꿳MѥLɪլde|AŧQjHjiլdAç̫լd iѡC
@@FxWȷ|J꿳kxAQצiC
@@oHGuiѴNpﵽw@X@tCʪijAF xiѤլdG`Cv
@@wƨFM`Aoǫij{ѦU@Բ sC
@@oHGuڭ̷|Ҽ{oǫijp[jbaoͫҹI@ tCIAHFPﵽwMNѵتCv
@@oHjաGu۱qoŧQjHjAw`ߪkMF POﵽwCv
@@LɥRA@ӥѫOwv⪺u@pեtdwoDZIC
@@bLhƤAFXF@tCﵽ¦ӷ~ӦtwM NѪIC
@@bߪk譱AFpXjw]ӷ~Bҡ^ҪAνd¦ ӷ~ӦtAHKﵽoǼӦt˸mγ]ơBqDBiXqDMܤ cC
@@oHGuھڲ{w]ӷ~Bҡ^ҹӷ~ӦtWwA¦ ӷ~ӦtW]˸mγ]ơAHΧﵽ䨫qDBiXqDMܤcC
@@LGukioXܡAWwtdHh̷ӷҭquhﵽ IAkҲ{ɦbqCv
@@bFI譱A@ӥѤuȧBBBΦtpBҤuBBqu{pH
ΨⶡɭιqӿӨ|Nզu@pաANפΧq ɪwXijAç@XiʡC
@@ܩNѤ譱ABwߤ@YաAtdBoi
wϬʡAH[jШ|Mpô|HhAL̹w{ѡC
@@~AB|@ӡuwjϡvpCwjϱNeu wȹMUVǻwTC
@@ϬF~ʴjNѡAwNO@EEKE E~ץDnŶǹBʪ䤤@ӥDDC
@@oHɥRGuu@pձN~twAPϦU
iŧQjHjլde|̫iѤҴUijCv
D@@EEC~b~gٳi @@@
@@HU]gưȧg٤Rҵo@EEC~Wb~gٱpΤ@E EC~aͲ`Ⱥ[wqnG
I С
@ھڤ@EEC~KgٹwץAwpaͲ`ȹWb
IA@EE~ҹw]q^Wʤ|IEC
@@EEC~Wb~A䪺gټWi@B[֡CĤGuaͲȹw
|ʤܦʤIWCoӼWTiĤ@uʤI@
WTC@EE~~|uWvOʤ|Bʤ|IBʤ IGMʤICCYLhXujl{AרObXf譱 ﵽAaͲȼWiwΡC
@骺gټWDnOѮݨDұaʡCѩγ]ƻݨDjjA
[WpcM糡Ӧtؿvʿn}iA}w|ۼWC HӤHfWBJíwWɡAHγҤuqAwO}
|kC
@f~Xfe{M۹íwA~Ub~{iy^ɡCS
OO驹ꤺa]a^Xff|i@BWɡAӿ驹ꪺXf f۪WCHӥyql~ݨDvWɡAs[YBxW MꪺXfi_dCOAXfWMi۹jlA HΦۤCHӪFȳfSȩұaӪQvTCPɶAAȥXfWh
w|C
@HӭgټWi@B[֡AҤuwCgu`ʽվ㪺~
vi@BAѲĤ@uʤGIUܲĤGuʤGI|CN~ vhbĤ@uʤ@I@CAHβĤGuʤ@ITC¾ ůʼƥؤjTWɡAӦJ禳ۼWTC
@OƭpA@EEC~OqȥѦʤCUլ IC~CӤ뤺AWTʤA@EE~ Oƥ笰ʤCMaqObӼƭӤ뤴iW[Aif 譱qȫhiOũMCӤBuҤަܵWݼȮɩʡC ӨA~qȹwLVUժlaC
~T ССС
D@@EEC~Wb~fXf{MbA@EEC~ӤWb~ AXfWTuʤkAP@EE~Ub~ɴTۦPC bXffȤA@EEC~Wb~ffȹW[ʤCAWt h~Ub~ʤKWTyCA䲣~Xffȶi@BU^A~Wb ~^TʤGACh~Ub~ʤE^TC
D@@EEC~Wb~AXf{MhQ]xZCjlA dzFXffb@ɥvOC~A饻gټWwAH
|W[P|vA֤F饻ifݨDC^ꪺifݨDwAoiO ]eֿnFjqsfӻ~@XվҦܡCbyql~IhPv TUAs[YifݨDjPhzCWzغح]~A䪺Xf~ VTA]OXfWw]@CLAPLA XfΤj{Ϊ{C
D@@EEC~Wb~iffȤ@~eWʤCA@EE ~Ub~ʤWT֡CWtץ[֡ADnObaݨDjj pUAdζiff~Wb~HpAjlWɦʤCkAӤ@~e hU^ʤ@CѩiffȼWtXffȬ֡A@EEC~Wb~ ζTtBX{EʤQrA۵iffȪʤQGIA@
EE~P۹ƦrOKʥ|QΦʤQ@I|CζTr XjADnO쥻aEWΨޭPꥻflǶqW[ұaʡC
D@PW~A@EEC~Ĥ@uAȿXοJWvʤ ΦʤCAөuoLζTվlTʻCѩTMLP
Tӷ~AȫWɡALζTbĤGu|~i[վlC
aݨD ССССС
D@O}WɡA@EEC~Wb~sq@~eW[ʤTI
|AӤ@EE~Ub~WThʤGICCsWɪpbĤGuS OAoPW~PʤI@ɴTAӲĤ@uɴThʤ GCTM]_b@EEC~Wb~PqAW~OۤWɤFʤ TQIGMʤQIGC
D@@EEC~Wb~A}jlCγ]Ƥ譱A@EEE C~Wb~dζifꥻfAHpA@~eEWʤGQTF Ӥ@EE~ȤWɦʤ@CӦtΫس]譱ApcӦtؿvʦb ƤjT^ɡAP~DZͶ՝ڦXC@ЫέpUu{][ֶi Ct@譱Aѩ֤߭pؤwA糡gu{ hҩwC
~ ССС
D@v~b@EEC~Wb~jɶZA]OήaΧ
ݨDӵuCgLDĤ@uAb|Τ첤 dTCLAb멳Τ몺jɶARADC멳 ɡAѩpFĨIHíwv~ΪajqW[v Av~DAͲHRC
D@@EEC~ĤGuAYzjέbAIJĤ@uWɦʤ
QTAP@~eAhXʤ|QKC쯲WɳtרS ֡A@EEC~ĤGuĤ@uWɦʤAP@~eAhW
ʤQ|C
D@@EEC~Wb~AgrӾP⥫QDCbgٮiΤΧ W[pUABDnӷ~ϤΨLKQaIүŤΤAżgrӡA R次ʴ_dCܩE譱Abs~ȫWpUAP⥫[ ӯȥiaíC]~ͲuǾEivTCu~ӦtM MbCshγ~u~ӦtݨDoy^ɡALoPgrӪݨD_d C
D@v~poijTW[A@EEC~ӤP@~eA ƥحpAW[ʤTʹsKAӫӭέnpAhW[ʤG
ʤTQ|CoܥӼƦ~svq|RΡCPɡAu~ӦtΡu LvOӦtpoiҼW[Aӷ~ӦthiU^C
ķ~ СС
D@@EEC~Wb~ĥD`DAѲSOZAڥͫ
b|uȦ^AbӤзsA@EEC~Wb~pAڥͫ ƤWɦʤQTAɴT饻BDwέ^ꪺѻƧ֡AP ƪɴTCCFȳfɤηaѥUvTAaѲbC ΤKgjiʡC
D@boqA@OíwC䤸HILDnf
աAT[vƦb@EEC~Wb~Wɦʤ@I|CCΤKA ~ubpôײvj@AoqFȳfɼvTC
D@ϥΪUڥHγftWɡCϬMѥM~DZA @EEC~Wb~APľcMѲgUڡBvUڡAHΩP ӦtBس]Ϊ~oiUڼWTLOUڨtC䤸sڥֳtWA bsBҦҦ]ӤWɡCĩM~MZAϬMb汵e ﭻg٪HߡC
Ҥu ССС
D@HӸg٥[ּWAҤupb@EEC~Wb~C gu`ʽվ㪺~vUAѲĤ@uʤGIU^ܲĤGuʤ
GI|CN~vBCFĤ@uʤ@I@βĤGuʤ@ ITC~AĤGuu@ɶN~HfvW@uC
D@N~pbDnAȦ~~X{jlWCѩ糡Ψpc ӦtؿvʼW[AӦtΫس]u{aLN~HƫۤWɡCۤϡA ҤuK{װͲu~ҥ~iAasy~N~Hƫ ֡Ct~AUDn~¾ůʼƦrjT^ɡC
D@լdDn~JAHfpAMi@BjTW[A ~۪WTCҦDn~XpAN~Hh~p⪺ JAHfpA@EEC~Ĥ@uP@~eAWɦʤEAӹWT hʤTCܩu譱AHfpA@EEC~TPh~A uꥭWɦʤAܰʤjC
qf ССС
D@@EEC~Wb~OqȤũMCDngtCq ȡBjlAHΥ@ɰӫ~洶MnAUifqȡCӥa ͪqOOwMC@EEC~Wb~OqȯSIAO~ íwApHЫίMqOPW~PɴTCAƦܤ@ǮO~MA Ȫ]UC
D@PW~PAOƦb@EEC~Wb~Wɦʤ IEA@EE~Wb~ʤITɴTCA@EE~ Ub~ʤICɴTy֡CXTӫƭpA@EEC~Wb~X OƥWɦʤIEAoӤɴT@EE~Wb~ʤ IKjCAӻP@EE~Ub~oɴTۦPC
̷sqw ССССС
D@ھڥHkA@EEC~aͲ`ȤλwwgNӧO] @XqA̷swnC
D@~T譱A@EEC~wfXfWvѸɹw ʤCIGUզܦʤIKCbXfAwfWvʤ KAӸɹwWvʤKIAoDnOѩ@EEC~~쪺W wCҭPAMĤGu禳ǼWAwaXfWNѸew U^ʤ@վܹsWCӤΤC몺aXf{]X{ũMW C
D@i楼ӡAXfbUb~|n{CHӤaXffۦ^
ɡA驹aXff|[tWCHӬJfíwݨDAw驹
Xf|Oi[WCѩyql~ݨDv_dAӴXӤ뭻驹
s[YBxWΫnXfiﵽCLAhQ]iऴ|ӭ XfWC@EEC~Ub~A۹jlN~vTXfv
OChӪFȳfۤCjTSȥ|CgtӪJfݨDC Y]FFδMCgټWvTAڬwpJfݨDiO MC
D@w@EEC~iff~WvNѸɹwpʤKIGվ
ܦʤKI|CfTWLwNQdζiffּWFd ifWAѸɹwʤCITդɦܦʤEIGCdζiff WɥPaݨDjlp۲šC
D@@EEC~XfAȹWѸɹwʤCIUզܦ AVUվDnO]@EEC~Wb~wCWҭPCP [pۤϡAĤGuȹC~譱{wtCLAb@EEC~Ub~ XȫȤHƱN^_`WCѩB譱íB^ɻPΥ]A]gBM~P LӥΪAȿXi@BWATWNi~ﵽAȿXC
D@PɡAw@EEC~JfAȹWvAѸɪʤ UզܦʤIAHϬMwCWC
D@aݨD譱A@EEC~wpHO}Wbʤ IܡCONSOOϬMbO~WOkCӴN~p}
nήaxJW|~MOݨDCӬ۹ũMq| ʶROC~AӦtJW[N~ʸmíѥΫ~Φ@ήO f~NC
D@wFO}b@EEC~bʤWC
D@ӤϬMg٧}䪺aTwꥻΦ`BWAwpb@EE
C~NʤQTI|WAɹwʤQIT֡C
D@HDnզpAwpcӦtΫس]}WvN ɹwʤEIհܦʤQGCoOѩpcس]ʽk γ̪سyPNѤjqW[ҭPCPɡA]@EEC~Wb~~qjT W[AwgaμӦtOμWTѸɹwʤGQW
Aհܦʤ|QCHӨpcؿvqW[AwaoiӪڤ QNX{ּWAFʤQAɹwʤQG֡C
D@t@譱AcbӦtΫس]譱}WNCAWѸ ɹwʤTէCܦʤ@ICM֤߭phu{vB uA@Ыέpس]u{N~jlW[C
D@XpΤcӬݡA@EEC~ӦtΫس]}䪺WvN ѸɹwʤI[֦ܦʤCIGC
D@γ]ƶ}b@EEC~WvNѸɹwʤQ @հܦʤQTIKCѩDnؤu{Kmθ˳ơA cΦbγ]ƤW}wWvNbʤTQܡCpc Φbγ]ƤW}䪺wWvѦʤQհܦʤQTAW[ ]Oѩjqb줽dz]ƤΤu~Ϋس]]IҭPC
D@ӻAw@EEC~aͲ`ȪWNbʤ IADnӦۥaݨDjlҭPAӥXf{hũMC
D@bOqȤ譱Aw@EEC~OƥѦʤCU զܦʤIC@EEC~CӤ몺OƥWTuʤ CCƼWܦʤIDnO]ѫBOɤɡC
_ɡA|^ܥ`Ct@譱AaͳqONӹBO ΦbEW[Ϊ~vBaíӼW[CӨA@EEC~qȼƦr LVUվ㪺laC
@@@@@@@@@@EEC~TQ@@@EEC~KGQE @@@@@@@@@@EEC~w@@@@qw @@@@@@@@@@@]ʤ^@@@@@@@@]ʤ^
WvG ССССС
pHO}@@@@@@@@@D@@@@@@@@@@D FO}@@@@@@@@@@@@@@@@@@@@@ aTwꥻΦߡ@@@@@D@@@@@@@@@D @gaμӦtOΡ@@@@@@@@@@@@@@ @ӦtΫس]@@@@@@@@@D@@@@@@@@@@D @@@@@@@@@@@@@@@@@@@@@@@@@D @@p@@@@@@@@@@@D@@@@@@@@@ @aoiӪQ@@@@@@@@@@@@@@@@ @γ]ơ@@@@@@@@D@@@@@@@@@D @@@@@@@@@@@@@@@@@@@@@@@ @@p@@@@@@@@@@@@@@@@@@@@@ fXf@@@@@@@@@@D@@@@@@@@@@D @a~Xf@@@@@@@Т@@@@@@@@@@@@ @f@@@@@@@@@@@@D@@@@@@@@@@D fif@@@@@@@@@@@D@@@@@@@@@@D XfAȡ@@@@@@@@@@D@@@@@@@@@@D JfAȡ@@@@@@@@@@D@@@@@@@@@@D aͲȡ@@@@@@@@@D@@@@@@@@@@D HfpaͲ`ȡ@D@@@@@@@@@@D
HɻpWvG СССССССССС
aͲȡ@@@@@@@@@@@@@@@@@@@@@ HfpaͲȡ@@@@@@@@@@@@@@@
Wv СС
Ͳ`ȥơ@@@@D@@@@@@@@@@D aݨDơ@@@@D@@@@@@@@@@D Oơ@@@@@@@@D@@@@@@@@@@D
@@m@EEC~b~gٳinbUPG]EG^_bDFXp CyaUFZPBoACQGC
D@pi[ֵoXJ @@@
@@uȧNU_i@Ӥ몺pAUpHoiӥ[t ήɶAqӥ[ֵoXvӦtJȡC
@@uȧoH]P^AѤUP@]E@^}lAbq ioipoiӡANiHܸuΦXӫذӶiUCγba qd~ӻPoipȤu{G
]@^餽@ƤƦètΡF
]G^سyXJfqDέɨlH|F
]T^ѨѤtΪfC
@@{ɡApHoiphP@ƤƦètΪ鶷Ѵȸpi AhѵoiӭtdCPˡAPF`sѤ]I綷Ѥȸp ų]AoiӭtdC
@@~AoiӸg`iݭnoipسysXJfqDAΪ
ئ]ؼӦӷl۳sH|MqDC{ɬOѸFpiWzu{ӥ oiӭtdC
@@oHXAspiHoiӧĦau{Aåiﵽ~ oipwMipA]ӥiHپؿvɶCaoiɹwpo uʪsߡAiHOoJȪɶFӤC
@@pGܷskAoiӥѻ{iHhNAN|tdiiʬsB б\iҡBPFΤΨƷ~cաBHήھڬJwзǺʷa Lu{C
@@uAN|iNf֡AHTOu{FFзǩMn DC
@@Ӥb@EEK~G멡ɡAFN|˰QӭpAMMw O_ʦaIC
@@{iHhεUcu{vAHΦaس]ӷ|wQԸߡAêܤ pCuȧwWPoHO@dKʦWHhξcAipC
D@¯l[j`gBʲĤ@qUP @@@
@@¯l[j`gBʲĤ@qNE뤻顣PAqH QGܤQEHhC
@@pPиӦ~ֲէOӱqLĤG¯l[jgHhAɧ֦b UPeg¯ḽ]C
@@poH顣PGuӹBʦۤCi}HӡAiiQA ǤMCv
@@uثeAFTQ|UC֦~wg¯l[j`gAĤ@q HʤQKICCv
@@LXAĤGqNEK顣P@}lAH~֤@ܤQ@
ൣCp|~֤@ܤൣHΤܤQ@pǥͱ¯l `g@XPwơC
@@Z@ܤൣAq¯lgΥuL@gAiE KܤQ@QaL̫e`gC
@@pݤUQTqEEҩM|QEd|ѧKO` gCӲէOww{woC
@@ܩܤQ@δNŪpǪǥ͡ApbEܤQ@|e ݤpǶi`gC
@@~Ai۶OepaͶEұ`gC
@@pdߡAiPq¯luGGKTT@s@@@C
D@D]DkήȫȳQP}EӤ @@@
@@JҳBoH]P^٤@W]kM^qޤu]Dk
EWڰZyMyȫȡAbϵPk|P@ʸTEӤC
@@ӦWQTQiGQKӻ{EΤiXkΪH oCCoQPJEӤAPC
@@ܩEWyMyȫȡACHQ@oJҳBBӱ oCKWyQiOPJ@ӤAwDܤJQGӤCӸӦWy QihQPʤ@ӤAwQKӤC
@@ƵoWP]KGQG^AJҳB¾b@ϫDkҤuʤA {Nmo{ӤEWȫȡAb]kM^hBq樮sC uMEWȫȥQ뮷@i@BլdC
@@լdұoAӤKWyȫȤOb@EE~Q@EEC~C L̹O~dѤ@ӤܤGQGӤCӦWyȫȩMޤuO˻YCLO bKӴȦArdܥTQ@C
@@KWyQiӻ{DۤvȫȨOiHbu@CӦWޤu ΥL̰uCCuS@ʦܤGʤ~AKHt~@io@d@ʤCӸ WyQihio@duSC
@@ӦWޤuӻ{DEHҬOȫȨAoMΥL̡CLèSd֥L ҩC
@@JҳBoHĵiAHhpΤiXkΪHAݹHkA̰@ ڬTQUΤJT~C
@@JҳBoHXAҦȫȡALר~P_AbJҳBBe
oqƥĤu@AHϳrdHhA|D˱A̰@ڬU J~C
D@֤߭pN䪺ζH @@@
@@{ɥߪk|]ȩe|DuLβzij]P^ܡA֤߭p Үi{M~ǩMV~AF@ȤӰϰؤu{AȤߪ HC
@@ѩLβz]ƯʮuAL{ɥߪk|PBNLXuDC FuXȤ߶}§AåNLPC
@@Lβz١Ab֤߭pQӶؤAw䤤KAӥBO bwOΤɧC֤߭pҨoZAwO]թ κzjصoiu{ĹoAC
@@LβzGu\h~cA]AFBӷ~BTBM~MdzNU譱 ´AXݥAHAѤΤɧڭ̦bzeju{p譱 ogCv
@@L١GubӤQܤGQ~AȤӰϩұ檺صoipA`ȱNF @UdCڬ۫Hӧڭ̱q֤߭pҨVMѩMޯA 䪺u{ɩwibo@MüCv
@@Lܾ֤߭pwBէCC@EE|~@AwB
ѭӪ@dʥ|QէCܤ@dʤKQGA@EE~Q
ӼBi@Bdܤ@dʤQ|C
@@LβzGu@{ɥߪk|]ȩe|DuA[W۾֤߭pb@E E@~i}HӡAڤ@HߪkijAѻP䤤Aظ@譱 {pXAڹbnVҦѻPou@HhAPHJߪPCv
@@LGu֤߭p{wiJ̫ᶥqCƱU~OLҳ yZAbw⦨ɧsξKoӾlUءCv
@@uȧK~ͥbD§PɪܡACFuXȤߥnNڭ̹ ҦgѻPFuWΫسyu@ؿvvBu{vBUݤHBӫذӡBuH άFHRC
@@LGuCFu{wXлxAXȤߥ紣ѤF@ӦQ mA[ojس]Cv
@@su{wpb_C׳B]ߤFCFuXȤߤάsF[ xCӸpŤE]ߤF֤߭piߡC
@@su{wppLܡAXȤߤ[xAiM YCFuRAiL̥RFѦbFuسyκL{A ҹJ쪺UذDԡC
@@XȤ߳]AiQΤ@ڤheC
@@XȤ߰FiXҫιϤ~AٮiX@ǥΨӿطFuơAҦp lC~Aߤٳ]mMqCXȹCFu{ѵ{סC bߥ~\FCj@qDlѹCH[C
@@CFuXȤߡA{w}[A}ɶP@ܤWQ ܤUȤɡAPBΤWQɦܤUȤɤTQC߳{PT
𮧡AY鬰Ahӱ}C~Aߥ|tϸBs~ As~𮧡CXȤߤJOΥKC
@@CFu[xh~}C}ɶPܤWCɦܱߤWQɤT QAPΤWCɦܲݤ@ɤTQC
@@@q譱Auڤh樫KaKPXȤߡAAȮɶ P@ܤѦWEɤTQܤUȤɡAPBΤѦWE TQܤUȤɤTQC
@@XȤ߬d߹qܡGG|E@KGC
D@ʤupѪNƧѿZ˳ @@@
@@F˳]P^Zn@NƧѿAqھګؿvҦVؿv ưȺʷҶ檺ʤupѪԱC
@@FoHAؿvu{MDu{wިAؿvM~Hh VؿvưȺʷʤupѫ~ii}u{C
@@oHGu|bCؿvu{MDu{MIAqӴCu{ aLuHBaLHhMFؿvBcMgaˮ`Cv
@@ؿvu{]AسyBaLBgaɴBaBBʤΥ[ؤu{A ӵDu{h]AسyBξQ]paDγqDC
@@ƧѿqFaLwz[cADnƶ]AG
]^@bرpUiؿvu{εDu{ʤupѡF
]^@ʤupѪ{ǡBɶBǩMpѪΦΤeF
]^@ؿvưȺʷbҼ{FSwؿvu{MDu{ʡBUʷŧO һݪHOMʤuAUؿvu{MDu{TwAʷŧOF
]^@TOaLwz[cBz[cC@զһݪHOBA¾ θgAHκz[cC@զGSwȡF
]^@Swu@sƺʤupѪk]䤤nNaLMu{MI{ת ǤJҼ{^BIukzAHFwiu{تAMJAIw MO@IF
]^@bرpUNLʤupѧ@XƫqAHΦij ιڰʤupѩүAΪ{ǡC
@@oHGub~yɶou@uhAN|CXYؿvu{ε
Du{ݩOԲӷǫhMkCbquhɡAN|Ը߫ؿv~Cv
@@p{iHhBUcu{vεUӫذӥǤWUC~AK| BA]A̰@ڤGQUG
]^@sƪʤupѤŦXҪDnWwF
]^@𦸻sƤŦXҳWwʤupѡF
]^@bSXz]UAe\ιڤWʤupѪeDn C
@@oHAسy~鬡ʩʤ|]NƧѿWwӦ}vTA] ijiOؿvaLnwзǡAåiַN~ƥةMlu@ ơAqӹ綠MؿvuHһtqC
@@wԸߤFgaΫس]Ըߩe|Ψس]pթe|B{iHhεU
cu{ve|Bسyӷ|Φaس]ӷ|CҦ쪺NMijbN ƧѿwɤwҼ{C
@@ӧNƧѿN@EEC~ETV{ɥߪk|Aùwp|b~ ѳWҦaFw_ͮġC
D@yݨDP @@@@
@@BpoHb^sDɬdߦO̩e|NpHvӦty DҵoiɻAiޭzpHvӦtݨDPέp rAOK۹Bp@EE~uyݨDsivFӳiR
@EE|~T몺pC
@@bsiAFߤF@ӥѷɰƹBqDzu@p աAtdwκʹij污pC
@@oHGuھڤ@sܡAb@EE~QGɡAv 쪺PݨDOW[ܤGQEUӤΤGQEU@dӡCv
@@u]AH`ƨӬݡAv쪺ѨDOthŪCv
@@uLAڭ̥窾xӧOaϦuʪpASOOqFϡBԩM oyϡCFwקﭻWзǻPǫhwﴣѦv쪺ޡAb
uʱpX{aϡAWwݭnѪvƥرN|W[Cv
@@uO̩e|iNO`DX@tCijABp惡 wCv
@@ܩbiĤGIqҴΪDAoHjաAۤ@EK@~_AF SbѪy譱@XC
D@OpayŧO @@@@
@@ҫO@p]Op^]P^ay̷sʹGAa HhΥDayC
@@Opbau{PayŧOAHtXӸpCgʹay誺 IC
@@Opھںʹpұojzƾڳ̷sͶաAayw| ŧOC
@@TQCӪaywGGCӤu}nv]@š^AQӤu@
v]Gš^AQGӤuΡv]Tš^AHΨӤutv]|š^C
@@u@švay]AG
@@LW]^@@@@@@@ĪŽ]^@@@@@@@ @@nW]^@@@@@@@@HW]^@@ @@FWy]^@@@@@@C]^@@@@@@@ @@xtݡ]^
@@uGšvay]AG
@@娤]^@@@@@@@FUy@@@@@@@@@@@@ @@`W]^@@@@@@@rW@ @@W]^@@@@@@@@[W]^@@@@@@@@ @@LW]^@@@@@@@֡]^@@@@@@@@ @@ۿD]^@@@@@@@@D]^@ @@thW]^@@@@@wFW]^@@@ @@tIW]^@@@@@@@MWĤ@y]^ @@Wy]^@@@@@@TPW]^
@@uTšvay]AG
@@jW]^@@@@@@@WFW]^ @@ȐW]^@@@@@@@©@W @@MWĤGy]^@@@@s@W]^@@@@@@ @@ȽuW]^@@@@@@@ay]^ @@W@@@@@@@@@@[hQW]^ @@RW]^@@@@@@@W]^@@ @@@@@@@@@@@@@
@@u|švay]AG
@@W]^@@@@@@@PW@@@@@@@
@@ƵG@@@D˳ay @@@@@]^@w]mTay
@@nWΪFWyѡuGšvରu@švFWBWβMW
@yѡuTšvରuGšvFȐWBWRWѡu|švରuTšvF MWĤGyѡuGšvରuTšvCoǪay誺ܤ@ݪayӵߤ 誺ܰʡC
@@@ӻAܦhaybjBιL|ŧOҪܪ謰 VCҥHaקKbɩΤjB᪺ƤѫeayaASOOuTšvM
u|švayCOpAu|švayq`bɭԧyaC
@@ثeAھڤ@EE~ayʹƾڦӾ˳ay WBWBŤEBCsWΥۿDyC
D@ȸpiu{ﵽsɰϨѤt @@@@
@@ȸpN~bsɶihu{AHﵽatΡC
@@u{NQGi}AbԿزĤGۧtwAHﵽ _ܤԪC
@@ĤGۧtwxqNFTUCdߤ̡C
@@u{]Aų]ޤαƤޡC
@@u{GQ@Ӥ맹CɡAۧtwNiI٪_@a
ܤϩGss|~CEUCdߤ̪ݨDC
@@~Aȸp|bWtsسy@өwAaGdEʦW ѭC
@@ثeMtsuϥηˤΤC
@@Ӹp|bMyXMtsų]GIA|Ѥ@ʤQܤTʲ@̪ ޡC
@@Wzu{NQGi}Awp@~Cu{OMyXĤ@u{
p@AN|MyXmXiϪ~ѭC
D@FFΤjĮ[toiiUݬs @@@@
@@ݮip]P^eUUݤqN[t_jsFFΤjĮoiAi iʬsC
@@ݮipoHGutXFWPgaHW[ЫΨpAڭ̫ij [֪FFΤjĮoitסANlUoipѤTאּCv
@@LGuĤ@oipOQ֤ߤu{@A{wjPAӲĤG u{wi}AùwpbGssG~Cv
@@LGuӨoiieǤKUKdHfCv
@@LGuIΪЫλݨDAڭ̻{ݭnNlUoiѤT אּiCv
@@oHGuĤToibGss~AHfؼбNѭQG
UWܤGQ@UdAӲĥ|bGs@@~oiAHfhѭp GQ@UWܤTQGUCv
@@LGuUݻݴNooipd@XijAHtXsqHf СCv
@@sرN]AWBu{BҡBBBqBȤΦa赥dC
@@Uݨ÷|s@ѪFFܩW@C[γ~QuiʡC
@@UݬsXѩݮipqqݮiBBijθUu {UݦqNñqC
D@`ʯfji @@@@
@@@ӥ[jʶǼef]ʯf^{ѤιwjiѤ]P
^_ܤE멳|C
@@jiяp|ͬDCӬ쪺Dnu@OwBMv fC
@@@EEC~ĤGuA|ͬ촿Bzd@ʤKQKvʯfPVӮסAP h~PdsTQGvAWɦʤTI@CPVʯfHhj~
CHC~֤GGQܥ|QfHPVӮ`ƦʤQ|FkʻPk Ҭ@IC@C
@@ҦDEPVʯfӮפArڼƦrPVӮת ơAHʤpɴTO̤jC~ĤGurӮצQvAh~ PhuTQ@vC
@@jipҦ|ͬEҡBaߩMUCΐh|G
QFh@@@KGQEܤE|
Rh@@@E|ܤQ өMh@@@EQܤQ oh@@@EQܤGQG
@@wʯfsŶǮMŶǥdNKOoAL̥Tϥ wMMקKWL@ʦQOwʯf̭nkC
@@iPqRuGCKs@GG@@ΩʳդhuGTTC@G@G @AdߦʯfơC
D@@EE~~gٲέpiX @@@@
FέpBss@EE~~gٲέpլdi{w}oA] AG
@@EE~u~Ͳ~έpլdi (|Q)F @@EE~ΦtؿvBسyΦa~~έpլdi @@@@@ (GQ)F @@EE~oBsBifPXfTBvΰs~έpլd@@@@@
i*((|QK)F
- @EE~BΦAȫ~έpլdi (GQG)F
@@EE~ܮwBqTB]ȡBOIΰӥΪAȫ~έpլdi @(TQ)C
WziHB^ӧΦXAChέpơAܤ@EE~ U~cθgSAoǸƬOq~cjo C
iέpƥ]AUC :
- cƥءBHơF
- ~SF
- ͲȡBPfBB~ȦqΨLJF
- W[ȡ]ΥHq糧aͲ`Ȫ^F
- ʤJf~έƪ`ȡF
- LB}F
- Tw겣RbȡC
i@EE~έpƦr~A٦@EETΤ@EE|~έpK nAHKC
oDzέpƦrFΨpHcbwFΨM譱AQΡC
WzibDQDFXpCyaUFsDBF ZPBoAibWJWDQGWJFjӤQEӬFέp BZXʱoC
D@EC~CfέpƦr @@@@
ĺz]P^oέpƦrܡAsڤξU MԴڪWtצbEC~CiwC@CXCKnƦrH LhƤ몺ƦrC
s
sڪɴTѤʤ@I@wܤCʤsIC sڤWɡADnO]䤸sڼW[ʤ@IKAPF~sڦʤ@
I|^TC
䤸sڸgLU^ʤGICAbCjTWɦʤ|
I@AөwsڪɶիA~WɦʤTI|AbCAW ʤTCt@譱AxWsکWɦʤ@IEAbCU^ GI@CwsڤWɡAO]ȦP~vAȦհws ڧQvAHlǴ䤸ҭPC
~s~Uʤ@IGAbCLɦʤsIA D~sګhjTU^ʤTI@AӤ^ThʤsI CD~sڤU^ADnOѩjաAϸ_䤸IL~ ײvWɦӲͪȮҤޭPC
UڤιԴ
CvٶUکMԴ`BU^ʤsIAӤhWɦʤG
I|CaHUWtשLh|ӤCܤCʤ@ITC ]OTĸUکMLaUڪWbCiwCt@譱A~U ~WW[ʤTITAbCU^ʤGIC
HfRAC䤸UڤWɦʤ@IEA~UګhU^ʤ GIGCѩ䤸UڪWt䤸sڲ֡A䤸UsvLɤQ@ ӦʤICbC멳ʤ@ʹsCICC
f
ѩ䤸sڪW[PFfʤGI^TA䤸f ۢbCWɦʤ@ICt@譱A䤸fۢۢb ChWɦʤ@ICCPW~PA䤸fۢWɦʤQ
|IEA䤸fۢWɦʤGQAӴ䤸fۢhW[ʤ
GQ|ICC
D@@EEC~C멳~xƼƦr @@@@
ĺz]ާ^餽AsPgabA@EEC ~C멳x~xƹFKʤ@QC]멳GKʤGQE^A C@ɲĤjC
C멳~װ~xƬʤQ@]멳GʤCQ ^AӤgah@ʤQ]멳G@ʤQT^C ~װ~xƻLU^AOu`ʦ]vTC
ާoHGuyqfb멳g@׳BA FC^_`AҥHڭ̦bCnʥάū^LѪȹC~Aѩ COFq~װ]FxƸh䤤@ӤA]ӥO~װ겣 Ҵ֡Cv
WzƦr]AܻXCsPXbA~װMga ~xƤOʤKQM@ʤQCC
~װ~겣 ]HQp^
@@@@@@@@]A@@@@@@@@@@@@@@]A @@@@@@@@@@@bB@@@
~@@@D@@@]D^@@@@D
~@@@D@@@@@С@@@@@@D
~@@@D@@@@D@@@@@D
~@@D@@@@D@@@@@D
~@@@D@@@@D@@@@@D
~@@@D@@@@D@@@@@D
~@@@D@@@@D@@@@@D
~@@D@@@@D@@@@@D
~@@@D@@@@D@@@@@D
~@@@D@@@@D@@@@@D
~@@@D@@@@D@@@@@D
~@@@D@@@@D@@@@@D
~@@@D@@@@D@@@@@D
~@@@D@@@@D@@@@@D
~@@@D@@@@D@@@@@D
Uaϥ~xƱƦW
D@@饻@@@@GdGʤGQ@@@@EC~C
D@@@@@@@dGʤQ@@@@EC~C
D@@xW@@@@KʤEQ@@@@@@EC~C
D@@w@@@@KʤQ@@@@@@EC~
D@@@@@@Kʤ@Q@@@@@ EC~C
@@@@s[Y@@@Kʤ@Q@@@@@@EC~
D@@@@@@Cʻ@@@@@@@@EC~
D@@Z@@@ʥ|Q@@@@@@EC~
D@@ڦ@@@@ʤKQ@@@@@@EC~
D@@NjQ@@@|ʤQ@@@@@@EC~
ƨӷG@ĺzBڳf´]ڪIJέpZ]ע ^^Bz
D@lFpoSOl@ȷ|ij @@@@
@@pzlFppu]P^ťA@MH@EEC~@ɻȦ
ڳf´~|DSOlAN~EGQ@]P^oC
@@oMlO~EGQTܤGQb|檺@EEC~@
Ȧڳf´zƷ|~|ClLYǫPϭbȬwڪ ĩMAȤߨ⪺~AOOG@Gl]ĩMȦ~^BG l]Ҩ^BT@l]TMqT~^Ml]ةM B~^C
@@uGuoMlHLILNLsCsLkOϹ
MAOΧ@LslFӤ|ޤJCiGQTBSϴT²Z lClѰs]pBϢТޢ]Ѣ^ LsCv
@@UClFNѩ]P^_iXoǶlѥwGlF`By
FClFBWlFΨFжlFCҦlF|o⭺ʡAC @C
@@ѩ_ܤE뤭]P^AҦlFwqlBw\P ʩMMPAOKCqʼƶq̤֬MlΤӤw\PʡA]W CiѤQQT_eqʪlFҭql~C
@@t@譱A@M]A|حȶlMPNEGQ@bUlFo ACMGQCiQΡuwql~AȡvwqʡC
@@sloACH̦hiʶRQi]YGʤQT^P@ȪlM ӮMPC
@@uܡJuUlFo歺駡]Yɻ\LAȡAiaƭ
ʩΦ۳ƫHʡA\WL\LCt~A@ӯSOlW|PɱXC
ӤGQGӶld^|ѽsբޢlW\LAȡCv
@@ҦlFEGQ@|ӱ`uAuɶѤWȤKɦܤUȥ|ɡF L骺AȥuoslMBzlC
@@PɡAFWDK@@ӪlթWȤKɦܤUȥ|ɱN|
\PʡA\LO@Ӧ|лxlWC
D@puͤ~i_o @@@@
@@pdШ|ժGQ|pɹqܸTAȡAECsM Du~i_o֡vAuXGKTT@s@@@Aw參PqťC
@@u~i_o֡vOĥΥͰʪs@ΦA襤~HMo ~ѡAøԲӸ~Ho֪]OѩsN´CιBʶq֡A
ݭnӪK|CAYϫOHߺDA|ϹLѪqn E_ӡAΦתաC~AɶɭOɭPέDDn]C
@@MDöi@BXpidͬҦAjէŪΫHڹB ʪnʡAåBij֦צhקKYתթMLAo˫KiĦa
CέD|ιw]έDӤް_ŦfBο}fefC
@@~AuCvѡu¯lѡvΡu¯ḽ][jgBʡv ^ơAHΦUϪ`gߪa}BqܩM}ɶ^Ϥ uAѥܡC
FD06134 | 1998_台湾_台北县中和客来美卡拉OK火灾_监察院纠正案文.md
分类:06_境外及港澳台调查报告 | 年份:1998 | 地域:台湾 | 严重程度: | 场所: | 起火原因: | 来源格式:md
監察院糾正案文:臺北縣中和市客來美KTV違規營業釀火災
手機版選單
search
搜尋
進階搜尋
Plurk
line
認識監察院
院長
副院長
秘書長
副秘書長
監察院簡介
常設委員會
特種委員會
訴願審議委員會
任務編組
單位編制與職掌
國際交流
審計部
相關連結
監察委員
本屆
歷屆
國家人權委員會
主任委員
副主任委員
委員
組織法
國家人權委員會簡介
監察成果查詢
成果檢索
調查報告
糾正案文
彈劾案文
糾舉案文
重大案件改善與處理結果
紓解民怨小檔案
資訊公開
法規
統計
廉政園地
出版品
預決算及會計報告
會議紀錄
巡察行事曆
會議行事曆
巡察報告
保有及管理個資項目總表
檔案應用申請
政府資訊公開
院務活動
便民服務
院長信箱
預約臨櫃陳情
預約視訊陳情
陳情信箱
陳情書範例
常見Q&A
建築風華
監察文史資料陳列室
參觀資訊
預約參觀
預約婚紗攝影
本院勞務承攬派駐勞工申訴機制
智慧客服
新聞與公告
院新聞稿
國家人權委員會新聞稿
委員會新聞稿
監察委員新聞稿
監察院月刊
影音專區
公告
徵才
熱門搜尋
上方連結
回首頁
網站導覽
兒童版
English
Español
下方連結
政府網站資料開放宣告
網站安全政策
隱私權保護政策
聯絡我們
交通資訊
監察院全球資訊網
EN
上方連結
回首頁
網站導覽
兒童版
English
Español
無障礙快捷鍵
ADHD友善介面
關閉
連結高亮介面
關閉
大型游標輔助介面
關閉
灰階模式
關閉
高對比度模式
關閉
顏色反轉模式
關閉
字級
小
中
大
調整行高
預設
1.5倍
2倍
調整字距
預設
0.12倍
0.14倍
網站色彩工具
棕色
藍色
綠色
重置設定
前往監察院智慧客服服務
Plurk
line
search
搜尋
進階搜尋
熱門搜尋
認識監察院
院長
副院長
秘書長
副秘書長
監察院簡介
常設委員會
特種委員會
訴願審議委員會
任務編組
單位編制與職掌
國際交流
審計部
相關連結
監察委員
本屆
歷屆
國家人權委員會
主任委員
副主任委員
委員
組織法
國家人權委員會簡介
監察成果查詢
成果檢索
調查報告
糾正案文
彈劾案文
糾舉案文
重大案件改善與處理結果
紓解民怨小檔案
資訊公開
法規
統計
廉政園地
出版品
預決算及會計報告
會議紀錄
巡察行事曆
會議行事曆
巡察報告
保有及管理個資項目總表
檔案應用申請
政府資訊公開
院務活動
便民服務
院長信箱
預約臨櫃陳情
預約視訊陳情
陳情信箱
陳情書範例
常見Q&A
建築風華
監察文史資料陳列室
參觀資訊
預約參觀
預約婚紗攝影
本院勞務承攬派駐勞工申訴機制
智慧客服
新聞與公告
院新聞稿
國家人權委員會新聞稿
委員會新聞稿
監察委員新聞稿
監察院月刊
影音專區
公告
徵才
首頁
新聞與公告
國家人權委員會新聞稿
國家人權委員會新聞稿
Plurk
line
網頁功能
列印內容
監察院內政及少數民族委員會會議本﹝五﹞日上午通過並公布柯委員明
謀、傅委員美華所提:「糾正臺北縣中和市景平路五四三號之『客來美KT V』,違規擴大營業面積,逾原核准面積一倍有餘,歷次消防設施檢查結果 ,不符規定者,多屬同一事項,臺北縣政府工務局及警察?
日期:87-05-05
糾正案文指出:客來美KTV,既違規擴大營業面積,且臺北縣政府工 務局曾先後九次勒令該KTV停止使用或恢復原核准使用在案,該局自應依 前開法令,嚴格執法,予以有效之強制處分,詎該局僅分別科處罰鍰新臺幣 六萬元及十二萬元了事,而未依規定,嚴格予以停止供水、供電或封閉、強 制拆除之處分,任令違規擴大營業面積事實持續存在,終致因該KTV發生 重大火災而損及四鄰,自屬違誤。 糾正案又指出:有關臺北縣政府針對違規行業實施斷電之行政處分,既 經前縣長尤清於治安會報裁示:自八十四年二月二十三日十四時起,由該府 建設局主導,該局對於違規行業斷電處分之執行,自應積極協調相關單位辦 理。縱該局認為自八十四年八月建築法修訂後,有關違規行業實施斷電之行 政處分權責,應即回歸工務局,惟該局在尤前縣長指示之後,與建築法修正 之前,此期間並未遵照縣長指示事項,追蹤辦理,仍有違失。縱該局以建築 法修正後,認由該局主導違規行業之斷電措施於法有所不妥,亦應於該府相 關會議中或循其他程序,請求重新界定主管單位。在該項權責未加釐清改變 前,自應依既有規定,認真辦理,以免有所誤失。詎該局於所職掌範圍之業 者,發生重大事故後,卻以權責歸屬界定不明,為卸責之詞,顯屬不當。且 該局與工務局就有關違規行業實施斷電之行政處分權責,究歸何單位所屬, 除以公文相互推託外,於八十七年二月十日本院約請該二單位相關人員到院 說明時,當場仍相互推卸責任,顯將該府所屬各機關應本諸「行政一體」切 實執行職務之原則,棄之不顧,此種行政作為,殊屬不當。 附糾正案全文乙份。
回上一頁
回最上面
選單
認識監察院
院長
副院長
秘書長
副秘書長
監察院簡介
常設委員會
特種委員會
訴願審議委員會
任務編組
單位編制與職掌
國際交流
審計部
相關連結
監察委員
本屆
歷屆
國家人權委員會
主任委員
副主任委員
委員
組織法
國家人權委員會簡介
監察成果查詢
成果檢索
調查報告
糾正案文
彈劾案文
糾舉案文
重大案件改善與處理結果
紓解民怨小檔案
資訊公開
法規
統計
廉政園地
出版品
預決算及會計報告
會議紀錄
巡察行事曆
會議行事曆
巡察報告
保有及管理個資項目總表
檔案應用申請
政府資訊公開
院務活動
便民服務
院長信箱
預約臨櫃陳情
預約視訊陳情
陳情信箱
陳情書範例
常見Q&A
建築風華
監察文史資料陳列室
參觀資訊
預約參觀
預約婚紗攝影
本院勞務承攬派駐勞工申訴機制
智慧客服
新聞與公告
院新聞稿
國家人權委員會新聞稿
委員會新聞稿
監察委員新聞稿
監察院月刊
影音專區
公告
徵才
下方連結
政府網站資料開放宣告
網站安全政策
隱私權保護政策
聯絡我們
交通資訊
地址:100216臺北市中正區忠孝東路一段 2 號
電話:(02) 2341-3183,陳情諮詢專線:(02) 2341-3183轉662
專線服務時間:週一至週五(例假日除外)09:00至12:00,13:30至17:00。
瀏覽人次
..
更新日期
115-08-01
FD06135 | 2001_港澳台_Corus_Port_Talbot_blast_furnace_explosion_2001.pdf
分类:06_境外及港澳台调查报告 | 年份:2001 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
1 of # pages Health and Safety Executive 8 November 2001 The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot
Health and Safety Executive Contents Introduction 3 Executive summary 3 The event 3 The cause 3 The investigation 4 Lessons 4 Background 8 The company 8 The plant 8 The management structure 8 The blast furnace 9 The structure of the blast furnace 9 The iron-making process 11 No. 5 Blast Furnace 11 The event 15 The explosion 15 The casualties 16 The damage 16 The mitigation 17 The investigation 17 The history of No. 5 Blast Furnace and the campaign extension 17 Forensic examination of No. 5 Blast Furnace 18 The Energy Department 19 Leak detection 20 The recovery 21 Conclusions 23 Proximate causation 23 Precursor causative matters 24 Lessons and recommendations 24 Actions – the company 32 Actions – Health and Safety Executive 33 Appendix 1 Photographs 34 Appendix 2 The cooling system 38 Appendix 3 Refractories 44 Appendix 4 Recovery of a blast furnace 46 Appendix 5 Mechanism of the event 47 Appendix 6 Protective clothing 49 Appendix 7 Lintel bolts 50 Appendix 8 Timeline of events 51 Appendix 9 Predictive tools 52 Appendix 10 Relevant legislation 54 Appendix 11 Previous HSE involvement 56 Glossary 57 The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 2 of 61 pages
Health and Safety Executive Introduction 1 This report concerns the events of 8 November 2001 at the premises of Corus UK Ltd, Port Talbot, South Wales. The explosion of one of the company’s blast furnaces led to the tragic deaths of three employees and injury of a number of other people. The explosion caused widespread alarm and concern throughout the locality. 2 This is an account of the events leading to the explosion; the incident itself; the investigations and legal processes after the investigations; and the lessons to be learned. The lessons are there for the steel-making industry both in the UK and worldwide, but they contain many fundamental truths for all manufacturing industries. Executive summary The event 3 At the premises of Corus UK Ltd, Port Talbot, No. 5 Blast Furnace exploded at approximately 17.13 pm on 8 November 2001. The entire furnace, which with its contents weighed approximately 5000 tonnes, lifted bodily at the lap joint, rising some 0.75 m from its supporting structures, leading to the explosive release of hot materials (an estimated 200 tonnes in total, comprising largely solids and semi solids, with a little molten metal) and gases into the cast house. Three employees died: Andrew Hutin, Stephen Galsworthy and Len Radford. A further 12 employees and contractors sustained severe injuries. Many more suffered minor injuries and shock. 4 The outcome of the explosion was unprecedented in the steel-making industry, but was the result of many failings in safety management by the company over an extended period. The explosion occurred after a prolonged attempt – over two days – to recover the furnace from a chilled-hearth situation caused by cooling water ingress. The immediate cause was the mixing of water and hot materials within the lower part of the furnace; the precise mechanism remains a matter that is not fully resolved. 5 The event attracted considerable public attention locally, nationally, and internationally within the wider steel-making industry. 6 The company was subsequently prosecuted under sections 2(1) and 3(1) of the Health and Safety at Work etc Act 1974 and was fined £1.33 million in the Crown Court, with £1.74 million costs also being awarded. The cause 7 The immediate cause of the explosion was water and hot molten materials mixing within the lower part of the furnace vessel. 8 The water had entered the furnace from its cooling system following a chain of events initiated by the failure of safety-critical water cooling systems. At the time of the explosion, attempts were continuing to rectify the abnormal operating conditions that this had created and to recover the furnace. The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 3 of 61 pages
9 Health and Safety Executive The precursors to the explosion were a combination of significant failures in health and safety management extending over many years. These failures were not confined solely to the blast furnace plant; they extended elsewhere within the company, and in particular to the Energy Department which supplied essential cooling water for the furnace. 10 A failure to carry out suitable and sufficient risk assessments for blast furnace operations resulted in the failure to implement robust technical and procedural controls. There was insufficient redundancy and security of cooling water supplies, and overall cooling system reliability showed a downward and deteriorating trend over several months. The investigation 11 A joint investigation was carried out by South Wales Police and the Health and Safety Executive (HSE) under the Work-Related Deaths Protocol. The Police held primacy for the first eight months. There was significant input from HSE specialist inspectors, the Health and Safety Laboratory (HSL), and South Wales Police forensic science teams. The Crown Prosecution Service was extensively involved in the various stages of the investigation; primacy passed to HSE following the decision that charges of manslaughter would not be brought against any party. Lessons 12 The investigation identified a number of learning points for both Corus UK Ltd and its blast furnace operations, the wider steel industry, and other manufacturers. These have already been communicated to Corus UK Ltd and action has followed to secure the necessary improvements. Details of the actions taken by Corus UK Ltd are included later in this report. (*Lessons 1, 5, 9, 10, 14, 15 and 18 relate specifically to Corus UK Ltd and its blast furnace operations, although some will also have relevance for the wider steel industry. The remaining lessons all have even wider application.) 13 The lessons below are presented as a summary; they include both procedural, engineering, human factors and reliability issues. The basis for each lesson is explored later in this report. 14 The technical sections of this report should be read with reference to the appendices. Safety management management. Lesson 1 The company should review the role and function of the Safety Department. It should be better integrated into operational and engineering Lesson 2 Blast furnaces are now under the COMAH regime (Control of Major Accident Hazards Regulations 1999), where identification and evaluation of major hazards is a legal requirement. Before this, predictive tools and techniques have had relatively limited use within the steel industry. Predictive tools for the assessment and management of risk should receive greater use within the steel industry and other process industries: eg Hazard and Operability Studies (HAZOPS), Failure Modes and Effects Analysis (FMEA), Fault Tree Analysis (FTA), Process Hazard Review (PHR) and Layers of Protection Analysis (LoPA). The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 4 of 61 pages
Health and Safety Executive Cooling water studies. Lesson 3 Sufficient cooling water for furnaces should be available at all times; the supply systems should have an adequate level of reliability built into the system. This reliability should be brought about by good engineering design (including an adequate level of redundancy) and suitable maintenance, and should be monitored to indicate any threats to its integrity. Lesson 4 Reliability engineering techniques should be employed to identify safety-critical plant and appropriate safeguards should be developed from these Lesson 5 Closed systems for furnace cooling water, or systems with equal or better reliability, should be provided wherever reasonably practicable. Leak detection Lesson 6 Speed in locating furnace cooling water leaks is essential. Rapid leak detection relies on good engineering, adequate detection protocols and suitably trained and competent operators. All operators of water-cooled furnaces should ensure that there are adequate measures in place for prompt leak detection. Lesson 7 On water-cooled metallurgical furnaces, where it is reasonably practicable, appropriate instrumentation, specifically designed for leak identification, should be installed to give earlier and more precise detection of leaking cooler elements. Maintenance Lesson 8 Maintenance, inspection and, where appropriate, testing of plant and equipment associated with the reliable delivery of water to furnaces should be paramount. The potential effects of lack of maintenance, inspection and testing in terms of safety should be clearly understood. There should be adequate prior communication between works departments when any maintenance or other work that may potentially affect safe plant operation or reliability is proposed. Formal protocols should be considered for this. Safety-critical items should be identified and protocols and priorities established for their maintenance, inspection and testing. Blast furnace recovery and abnormal plant conditions Lesson 9 The specific process of conducting a blast furnace recovery gives rise to additional risks significantly over and above normal operational risks. It is essential that all personnel involved are aware of those risks and there are control measures, including arrangements for effective communication, in place such that adequate risk control is maintained. The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 5 of 61 pages
Health and Safety Executive Lesson 10 A specific issue with the recovery of No. 5 Blast Furnace was that as it developed, there was an incomplete knowledge of the changing status of the furnace. During abnormal plant conditions there should be a competent senior manager detailed to retain an ‘overview’ of the developing situation and to keep a specific watching brief on critical parameters, so as to be able to inform those more intimately involved in dealing with the abnormal situation. Specific parameters in the case of blast furnace recovery operations should include such critical data as liquid iron levels, hydrogen levels and trends. Management of change Lesson 11 A formal system of pre-modification risk assessments should be instituted for any changes (including changes to operating parameters) proposed to safety-related plant and equipment. This should be coupled with post-modification safety reviews. The management of change system should include evaluation and assessment not only by the engineering and operational functions, but also by appropriately experienced and competent safety professionals. Duties and responsibilities for this should be clearly identified. Changes to the physical characteristics of plant should be carefully assessed for any impact on risk profiles and should be carried out with best engineering practice. All such changes should be carefully recorded and subsequently re-evaluated to determine their actual operational impact. Decision making Lesson 12 In emergency situations, there should be management arrangements such that there is a clear ‘line of responsibility’ for decision making. There should be no doubt whatsoever as to who is making which decisions. Lesson 13 Decisions made by managers under pressure from adverse plant or process conditions present a potential source of significant error. Adequate training and experience is essential, but more precise decision-making protocols should be available for foreseeable circumstances to guide and inform decision making. Careful consideration should be given to providing emergency event- simulation training etc to build operator confidence and skills in emergency or abnormal process conditions. Design issues conditions. Lesson 14 Opportunities to achieve risk reductions by radical design improvements on blast furnaces are very infrequent. The design of new or extensively rebuilt furnaces should take into account the need to improve the reliability of cooling water supplies and to have suitable pipework layout, valve arrangements and water monitoring systems so as to facilitate prompt leak detection and remedial action. Lesson 15 The provision of improved monitoring systems, purpose-built for monitoring cooling water parameters on blast furnaces, should be considered. Safety-specific instrumentation of adequate precision should be designed and installed to address specific foreseeable operational and abnormal operating The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 6 of 61 pages
Health and Safety Executive Human factors Lesson 16 It is essential during abnormal plant or process conditions that all personnel are clear as to who is responsible for decision making and that they have provided adequate lines of communication. Employees should have a precise and clear view of their roles and responsibilities, and be supported by suitable training, procedures and other job aids. Lesson 17 The awareness of the danger of water/metal and water/slag explosions should be raised among all employees engaged in processes where this is a risk. The degree of risk presented by molten materials coming into contact with water continues to be not fully appreciated. Lesson 18 The process risks associated with safety-critical plant, especially ageing plant, should be thoroughly understood through rigorous assessment processes, with these being subject to regular review. Specifically, with water systems on blast furnaces, a ‘leakage tolerant’ attitude should not be allowed – especially with older furnaces. Such raised acceptance of water leaks increases the risks of an adverse event occurring at some point. The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 7 of 61 pages
Health and Safety Executive Background The company 15 The company was formerly known as British Steel Plc. It was, at the time of the accident, Corus UK Ltd, this company having been formed in 1999 following a merger between British Steel Plc and the Dutch steel maker, Hoogovens. Steel making has been carried out on the site for many decades, both in public and private ownership; generations of local residents have been employed at the premises. Employee numbers at the time of the incident were circa 3500; the company also employs considerable numbers of contractors. The plant 16 Port Talbot is an integrated steelworks manufacturing flat steel products for a very extensive range of industries. Iron is made on site from basic raw materials in two blast furnaces (designated No. 4 and No. 5 for historical reasons); this is then converted into steel. The two furnaces at Port Talbot at the time of the explosion were fundamentally different: No. 5 was to a 1950s design, albeit much modified over the years; No. 4 was constructed in the early 1990s to a much more recent Japanese design. The management structure Manufacturing manager 8 x day technologists shifts (one per shift) (one per shift) Maintenance technologist (one per shift) 8 team members (per shift) 8 team members (per shift) 8 ancillary team members (per shift) (one per shift) Managing director Iron and steel manager Team leader No. 4 furnace Team leader No. 5 furnace Production technologist Production and maintenance Area technologist Area technologist The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 8 of 61 pages
Health and Safety Executive The blast furnace The structure of the blast furnace 17 No. 5 Blast Furnace at Port Talbot was a conventional ‘column–supported’ furnace of a type in use worldwide. It consists of a large (circa 90 m) vessel supported on heavy steel columns. The charging and discharging arrangements, together with systems for dealing with the gases produced in the process, are shown in Figure 1. Figure 1 Diagrammatic 18 To understand the significant features referred to in this report, Figure 2 may arrangement of No. 5 Blast help. Furnace and ancillary plant The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 9 of 61 pages
Health and Safety Executive Bleed valves Skip charging Receiving hopper Skip bridge Upper furnace Lintel shell Supporting Bolts Bosh column shell ‘Bustle main’ ring pipe for hot air blasts Supporting column x 8 Slag notch Hearth Downcomer Blast furnace gas to gas cleaning plant Distributing chute Water cooled refractory lining Upper furnace shell Lower furnace shell Lap joint Hot air blast Tuyere x 24 Iron notch Figure 2 Blast furnace showing significant features The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 10 of 61 pages
Health and Safety Executive The iron-making process 19 The purpose of a blast furnace is to produce iron by chemical reactions on iron oxides (iron ores) and convert them into liquid iron. This is achieved by ‘charging’ iron ore, coke, sinter (a product of iron ore fines and coke), and limestone into the top of the furnace and subjecting these materials to a series of complex chemical reactions within the furnace. The charge materials (or ‘burden’) gradually works its way down the furnace vessel, reacting chemically and thermally as it does so. At any given time the furnace burden can amount to around 1800–2000 tonnes of materials. Preheated air or ‘hot blast’ is blown into the furnace via nozzles known as ‘tuyères’. This blast air is an essential part of the process – typically it will be heated up to 1100 °C. The raw materials introduced into the top of the furnace take some six to eight hours to descend to the bottom of the furnace where their conversion into liquid iron and slag (ie molten waste material from the furnace) is completed. The liquid iron and slag is then drained or ‘tapped off’ at regular intervals from the furnace. 20 In addition to liquid iron and slag, large quantities of hot gases are produced in this process. The gases exit the furnace through ‘uptakes’ which merge into the ‘downcomer’, the large gas offtake running from the top of the furnace to the gas plant. On exiting the downcomer the gases are cleaned and cooled to allow them to be used for combustion purposes. Some of the cleaned gas is directed to ‘stoves’ where the gas is burned to produce further hot blast air for the furnace. 21 An essential feature of the iron-making process is that, due to the chemical reactions taking place, the whole process is intensely exothermic, ie it generates considerable heat. Therefore there is an essential requirement for cooling of the furnace shell and lining. No. 5 Blast Furnace 22 No. 5 Blast Furnace was constructed on site by an American Company, Davy International, and was completed in 1959. It was known as a lintel or column supported furnace. The lintel was a large structural steel ring supporting the furnace stack. A great many furnaces of this design were constructed from the 1940s onwards, and many furnaces of similar design are currently operational throughout the world. The furnace was in essence a two-part steel vessel, with the upper part – the stack – supported via the lintel on eight large steel columns, each attached to the lintel by eight large bolts. The lower part of the vessel comprised the ‘hearth’, a crucible holding molten metal and slag, and the ‘bosh’, an outward sloping section just above the hearth. The two-part steel vessel had what is known as a ‘lap-joint’ at the interface between the two sections. This was a sliding and overlapping joint to allow for the expansion of the shell and refractories. This overlap of the two parts of the steel shell plate was some 200 mm. 23 The shell was heavily lined internally with refractory material. The shell was also fitted with numerous cooling elements intended to allow a constant flow of circulating cooling water. Cooling elements were located within the refractory lining to convey away thermal energy and hence prolong the life of the lining. Although coolers were located throughout the shell there was a greater concentration in the lower areas where the greatest heat was generated. 24 Starting in the early 1970s, the original shell and cooling elements had been subject to extensive replacement and modification. This was to be expected as inevitably the refractories, and eventually the shell, will deteriorate with time. The replacement of the shell at this time allowed the fitting of coolers of high-purity The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 11 of 61 pages
Health and Safety Executive copper. At the time of the accident the majority of coolers in No. 5 Blast Furnace were constructed from this material, although there were also a lesser number of cast-iron coolers. 25 The purpose of the blast furnace refractory lining is to enable the furnace to resist the intense mechanical, chemical and thermal conditions within its interior. The precise composition of the refractory again depends on where within the furnace the lining is to be installed. Tougher, more abrasion-resistant materials tend to be located at the upper sections, where mechanical abrasion is prevalent, with more chemical-resistant materials used lower down in the furnace where the liquids that are formed are chemically active. It is a feature of blast furnace practice that the furnace lining will inevitably deteriorate during the operating period of the furnace. This gives rise to each such operating period being known as a ‘campaign’. 26 The purpose of any blast furnace is to convert iron ore (containing many impurities) into liquid (pig) iron. The generic name given to the mix of materials charged to the furnace – specifically coke, limestone and iron ore – is the ‘burden’. This is introduced (‘charged’) to the furnace via an inclined skip hoist which travels up a large inclined skip bridge. The burden is introduced into the furnace through a gas-tight distribution system at the furnace top. This system is also designed to prevent the escape of gas from within the furnace during charging. The charging and distribution system is known as a ‘Paul Wurth top’ (derived from the name of the manufacturers). 27 Gas produced in the process is conveyed from the furnace to an adjacent gas plant by means of a large inclined pipe known as a ‘downcomer’. Hot air is supplied to the furnace from the stoves via the ‘bustle main’. This is a large circular pipe that surrounds the lower portion of the furnace. The bustle main supplies hot air through ‘tuyères’. There were 24 tuyère assemblies on No. 5 Blast Furnace. In practical terms, the tuyère assemblies are nozzle systems through which the hot blast air enters the furnace. The tuyères are connected to the bustle main and blow heated air into the furnace hearth jacket. 28 Gas pressure produced in the process is controlled by a large valve device known as a ‘Davy cone’. Excess pressure can also be relieved by three bleeder valves situated on the furnace top. The bleeder valves on No. 5 Blast Furnace could be operated both automatically and manually. 29 On No. 5 Blast Furnace there were two water-cooled tap holes to allow molten metal and liquid slag to be removed. When tap holes are not in use a mechanical device known as a ‘clay gun’ is used to block the tap holes with a plug of impervious ceramic material. In No. 5 Blast Furnace only one tap hole was normally used at any one time. 30 The lower operational area of the furnace was a partially enclosed structure known as the ‘cast house’. The cast house on No. 5 Blast Furnace also contained the control room or ‘jump desk’ where electronic monitoring devices and computer mimics were housed to enable the operation and furnace conditions to be monitored and recorded constantly. 31 The control room provided operators with a good view of the furnace tuyères and tap hole areas. 32 The cast house floor accommodated refractory-lined ‘runners’ to channel molten slag and iron away from the furnace, molten slag either to the slag pits or the granulator, or, in the case of the molten iron, to large rail-mounted ladles known as ‘torpedoes’. The iron was normally collected in these torpedoes for transportation to the steel-making plant. The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 12 of 61 pages
Health and Safety Executive 33 Access to the upper parts of the furnace and equipment on it, such as the cooling system components, was by means of nine circular steel access platforms which were situated at regular levels up the body of the furnace. These were connected by steel access stairways. 34 At the time of the explosion, No. 5 Blast Furnace had produced over 14 million tonnes of iron during the campaign since the 1989 rebuild. The cooling water system 35 The process of iron production is extremely exothermic, generating temperatures of over 2000 °C within the furnace, and the provision and maintenance of adequate supplies of cooling water is essential. The normal requirement on No. 5 Blast Furnace cooling system was for circa 80–90 thousand litres of cooling water per minute. 36 A complex cooling water system was provided to accomplish this, and basically comprised two main systems: the distribution system actually on the furnace and that supplying water to the furnace distribution system. 37 There are two basic types of furnace cooling water systems used on blast furnaces: they are described as ‘open’ or ‘closed’ systems. 38 In an open system water is drawn from a supply source, pumped through individual cooling circuits, returned via open-topped troughs known as ‘launders’ and then, by gravity, to open collection ponds and cooling towers. In closed water systems the various individual supply systems are self-contained and pump and recirculate the same water over and over again. Crucially, this type of system is not open to atmosphere at any point on the furnace, unlike an open system. 39 There was an open system on No. 5 Blast Furnace. The system was largely as it was originally installed. This design of system is commonly used on furnaces of this age throughout the world. 40 There were in excess of 1400 cooling elements on No. 5 Blast Furnace. 41 The majority of the coolers in No. 5 Blast Furnace were ‘flat’ or ‘plate’ coolers. At various locations within the furnace other specialised coolers, again usually copper but on occasion cast iron, were fitted to the furnace. These included: ■ tuyère coolers – these were copper cooling elements at the end of the tuyères; ■ stave coolers – these were large coolers made of cast iron; ■ ‘big coolers’ – these were copper cooling elements fitted around the tuyère cooler and fixed into the hearth jacket; and ■ tap hole staves – cast-iron cooling elements around the tap holes where molten metal and slag is drawn off. 42 There was also a large number of tubular copper cooling elements in the furnace. These are known as ‘Sorrelors’ (or on occasions, because of their shape, ‘cigar coolers’). There are operational benefits in the use of Sorrelor coolers in that they can be fitted relatively easily (by drilling a hole), and at any time, into areas requiring additional cooling, unlike flat coolers which generally require far more work to facilitate installation or replacement. A number of Sorrelor coolers had been fitted to No. 5 Blast Furnace during its campaign lifetime, especially since the mid-1990s. The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 13 of 61 pages
Health and Safety Executive 43 The continued efficiency and integrity of coolers is entirely dependent upon a constant flow of cool water through their internal channels and labyrinths. If the supply of water to a cooler is interrupted, any residual water within the coolers will boil and evaporate. This in turn can rapidly cause the cooler to melt or ‘burn out’; copper has a melting point of circa 1083 °C, much less than the temperatures encountered in parts of the furnace. Coolers can also fail through other mechanisms such as, for instance, mechanical abrasion. 44 The speed and extent to which coolers will burn out depend on a number of factors: their position within the furnace (coolers in the bosh and lower stack areas are particularly vulnerable); how long the supply is interrupted; the existing condition of the cooler; and whether the cooler has any protection by ‘scabbing’ (accretions of solidified silicaceous material adhering to the cooler body). As originally fitted, coolers will be covered, and protected, by refractory material. As the refractory material erodes back towards the shell as the campaign progresses, the coolers progressively lose this protection. While this is entirely normal, it does give rise to increasing cooler vulnerability to mechanical and heat damage. The gas pressure within an operating furnace is less than the water delivery pressures within the coolers. Once a cooler has failed, water from the pressurised system will flow directly into the interior of the furnace, potentially disrupting smooth furnace operation and eventually leading to risks to safe operation, depending on the amount of water entering the furnace. Importantly, if the water supply to a failed cooler is subsequently restored, the potential for a serious water leak into the furnace is considerable. 45 Once a failed cooler has been identified it is generally either removed and replaced or ‘grouted up’ with aluminium oxide grout. The cooling water supply system 46 The cooling water supply system for No. 5 Blast Furnace, at the time of the accident, was from a facility known as Margam B Power Plant and comprised: ■ two ‘Sulzer’ pumps – large electrically driven water delivery pumps deriving their name from the manufacturer; ■ two steam turbine-driven delivery pumps (referred to as ‘turbo pumps’ ‘T1’ and ‘T2’); ■ three electrically driven cooling water pumps (associated with the evaporative cooling towers); and ■ one cooling water tower together with associated fans. 47 Also provided was an emergency water make-up system. This was a tower mounted tank, designed to operate if the delivery water pressure dropped below circa 3.7 bar, and release water from the tower into the furnace main. This system operated at a lower pressure than the normal furnace water supply pressure and it was primarily designed to provide cooling water to the lower part of the furnace while emergency shutdown procedures were followed. 48 Water drawn from the cooling tower cold-water sump was intended to be pumped continuously to the furnace using two individual main supplies and at an agreed control standard of flow and pressure. A proportion of the returned water was passed over the cooling tower, some was filtered; a small amount was added to make up any losses. 49 The two electric Sulzer pumps were each capable of supplying water at 45 000 litres per minute. The turbo pumps, T1 and T2, had a capacity of 45 000 litres and 34 000 litres per minute respectively. Normally two 45 000 litres-per-minute units would be run simultaneously to supply sufficient cooling water to the furnace. The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 14 of 61 pages
Health and Safety Executive 50 The normal practice at No. 5 Blast Furnace was to run one electric Sulzer pump and steam-driven turbo pump T1, each delivering 45 000 litres per minute. 51 Normally, the second Sulzer pump would be on automatic standby. Any loss of pressure would be detected by pressure switches set to automatically call for the standby unit to start should water pressure fall below a predetermined level. 52 There was instrumentation at the plant which allowed the monitoring of the total flow of water and water pressure and individual header flows and pressures. Temperatures were also monitored at several points including the launders, hot well and main manifold. Crucially, there was no instrumentation (such as flow meters) provided on the system to measure the quantity of any water loss from the system into the furnace. 53 The water supply, pumps and associated equipment were controlled, maintained and managed by the work’s Energy Department, which provided this function for both furnaces. The event The explosion 54 The explosion occurred at approximately 17.13 hours on 8 November 2001. There was little or no warning to personnel working on the cast house floor, although some witnesses later spoke of the event being preceded by ‘rumbles’ within the furnace moments before the actual explosion. At the time of the explosion there were three employees actually on the furnace stack, and several employees and contractors in the cast house floor area. Three employees were within a few metres of the tap hole, with several in the ‘jump desk’ (control room). 55 The accident event began with a rapid over-pressurisation of the furnace contents in the bosh area due to the interaction of water and hot molten materials. The immediate effect of this furnace over-pressure was to lift that part of the structure above the lap joint upwards, the furnace lintel rising up off the column heads normally supporting the furnace. It is estimated that the structure above the lap joint rose by some 0.75 m. This structure, with its associated burden, was estimated to weigh around 5000 tonnes. The lifting of the upper part of the furnace left an opening of approximately 400–600 mm around the entire circumference at lap joint level. Gases and hot materials were ejected horizontally from this opening. During the period that this gap remained open, some 200 tonnes of liquid, solid, and semi-solid material were ejected onto the cast house floor. Gaseous material and dust rose into the cast house, exited through various openings in the building and into the atmosphere, where much of it ignited. A cloud of ignited dust and gaseous material was thrown several hundred feet into the air above the furnace. The furnace-top ‘bleeder’ valves also opened and discharged into the atmosphere. Gases from these valves also ignited. 56 The furnace then fell back down vertically as the pressure decreased. During the explosion it had twisted (anticlockwise) through approximately 20–50 mm and moved a distance off-centre of about 100 mm, leaving it supported on the lower lap joint plate, with the lintel mounting positions no longer in contact with the column top flanges but instead some 50–100 mm above the column tops. This meant that the weight of the furnace stack was resting, eccentrically, on the lower lap-joint plate. The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 15 of 61 pages
Health and Safety Executive 57 During the movement of the furnace, many of the various water supply pipes to the furnace were ruptured; for some time, the water supply continued to flow from these pipes into the cast house and onto the hot materials which had been discharged, flooding the cast house with very hot water and steam. The gas offtake system was severely jolted, but furnace gas containment at the gas plant and top of the furnace vessel was maintained throughout. The whole event lasted only a few seconds. The casualties 58 There were three deaths. One employee died at the scene, another in hospital shortly after. The body of a missing third employee was recovered from the slag pit area the following day. A dozen or more employees and contractors were admitted to hospital, with some of these remaining in intensive care for several months. Their injuries included burns of varying severity and other injuries including serious fractures and lung damage from the inhalation of hot gases and dust. Several individuals had very serious burns and multiple injuries of a life-threatening nature. The injuries arose from blast effects, burns from the hot gases and dust ejected, and burns from hot water and steam. A number of personnel present were subsequently also diagnosed with post-traumatic stress disorder. The damage 59 Damage was generally limited to the confines of the blast furnace area. 60 The lifting of the furnace body caused considerable disruption to all its services and associated plant. The furnace structure immediately after the accident was no longer supported directly upon its structural columns and was therefore in a potentially unstable condition. 61 Hot materials comprising molten slag, molten iron, partially reacted coke, sinter and unreacted coke, together with larger lumps of agglomerated burden material, had been ejected through the open lap joint that also damaged the blast wall immediately behind the west side of the furnace. Subsequently, furnace burden penetrated into the water manifold/launder area and into the hydraulic room destroying the water manifold and damaging the wall of the hydraulic room beyond. Penetration of molten burden through a doorway into the amenities block initiated a significant fire which caused serious damage. 62 The profiled steel cladding of the building was severely damaged in several areas, with some sheets being projected in excess of 40 m. Molten slag was thrown over most of the cast house floor and flowed as far as the entrance ramp to an estimated depth of between 300 and 600 mm. There was no penetration of solid material into the control room, although there was impact damage to its front. The lights in the cast house roof were undamaged. 63 Areas where gas plant structures had moved significantly were identified after the accident, but gas containment was maintained and there was no major blast furnace gas leakage from the downstream gas system. Significant amounts of flame and gas were, however, emitted through the furnace top bleeders. 64 Subsequent engineering evaluation by Corus engineering personnel deemed the furnace to be beyond repair; the decision was taken to demolish and rebuild, and this work was put in hand within weeks of the accident. The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 16 of 61 pages
Health and Safety Executive The mitigation 65 Following the explosion, the existing site major emergency plan was immediately triggered. After the explosion, the remaining furnace contents were still ‘active’, and generating large quantities of blast furnace gas comprising mainly carbon monoxide. 66 Within a short time of the event, blast furnace personnel had established a large water seal at the gas system to isolate the furnace from the downstream gas systems. The water supply from the Energy Department was isolated. The furnace was vented through its flare stack and bleeder valves. 67 The structural stability of the furnace and its associated plant was a matter of immediate concern. Following engineering inspection, remedial works were put in hand to ensure stability and safety. 68 The furnace was largely sealed in preparation for ‘quenching’. This involved the carefully controlled addition of thousands of tonnes of water to the furnace contents over a period of weeks to halt the internal reactions, stop gas generation, and put the furnace into a safe condition for demolition. Once necessary forensic examinations had been completed, the ‘quenched’ burden and the refractory materials within the furnace body were removed. The furnace shell was cut into sections and dismantled. The lower bosh and hearth material was essentially solidified and was not finally removed until most of the furnace structure had been dismantled. The investigation 69 The Work-Related Death Protocol was triggered soon after the accident was reported. The South Wales Police Major Crime Support Unit assumed primacy for the joint investigation with HSE; after some eight months primacy passed to HSE. Significant police forensic science input was also committed, as was specialist support from HSE’s Field Operations Division, together with major technical input from HSL. 70 As the investigation developed, expert opinion was sought from Canada, Germany and the United States. A Major Investigation Management Board was appointed to oversee HSE’s activities. 71 The Crown Prosecution Service was involved throughout the investigation, in particular with the legal issues surrounding the consideration of potential charges of manslaughter against any party. There was a Corus investigation of this accident in accordance with the company’s well-established accident inquiry procedure as agreed with the trades unions. The history of No. 5 Blast Furnace and the campaign extension 72 The construction of No. 5 Blast Furnace was completed in 1959. Following three relines, in 1972 the furnace underwent a major rebuild. In 1979 the mid-stack section was replaced and additional coolers added. 73 In 1989 a further furnace reline took place. The refractory lining was replaced and upgraded. Additional coolers were installed which led in turn to increased water supply requirements. On the 22 March 1989 the Planning Committee of British Steel Plc recorded that a rebuild of No. 5 Blast Furnace was planned for 1995/96. The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 17 of 61 pages
Health and Safety Executive 74 In 1992 an incident during the repair of the stove brickwork at No. 5 Blast Furnace depressurised the furnace and necessitated a furnace ‘recovery’ over a number of days. 75 In 1994 there was a ‘breakout’ of molten metal from the furnace, caused – it is believed – by water leaking from tuyère coolers. Substantial damage to bosh coolers resulted, but no injuries. During the course of the recovery of the furnace following this incident, a run of slag had occurred from the lap joint, and the decision was taken to ‘box in’ the lap joint. This, in some measure, adversely affected the ability of personnel to quickly detect water leaks. Sorrelor coolers were installed in the tuyère breast area at this time. 76 Following the 1994 episode, a decision was taken to extend the campaign life of No. 5 Blast Furnace and an ‘Extension Committee’ formed. On 5 September 1995, at a meeting of the ‘No. 5 Steering Group Committee’, a ‘Campaign Extension’ team was formed with the objective of extending the campaign to at least 2000. 77 At a meeting of the No. 5 Steering Group Committee on 9 April 1998, an intention to extend the campaign life to 2003 was noted. That was reiterated at a meeting of the Steering Group Committee on the 8 July 1998. 78 This committee was chaired by a senior blast furnace manager, and comprised experienced representatives from Engineering, Production, and Energy Department staff. No Safety Department staff or others with professional risk assessment expertise attended any of the many meetings of this committee. 79 The ‘Extension Committee’ (as it became known) met four times a year from 14 December 1994 to 18 October 2001. It had a budget of £1 million per year. 80 The overall result of the Campaign Extension Committee’s deliberations and actions was that the proposed furnace rebuild originally planned for 1996 was, subject to a rolling two-year review, extended to an indeterminate date into the future. The Committee continued to meet on a quarterly basis. Forensic examination of No. 5 Blast Furnace 81 No. 5 Blast Furnace at Port Talbot is shown diagrammatically in Figure 2 and Appendix 5. 82 Detailed forensic examination of the furnace following the explosion revealed the following: ■ the furnace stack was resting on the lap joint rim; ■ the lintel beam was no longer in contact with the eight supporting column heads; ■ the securing bolts for column heads to lintel were all broken (except in the case of one column head (column 3) where the entire head plate had fractured, complete with bolts); ■ the securing bolts (and weld at column 3) had been fractured a substantial period of time before the incident; ■ the furnace shell showed significant distortion due to heat in the lower stack area above the tap hole; ■ a number of coolers were found to have been leaking badly (see Appendix 2 for details of how many and which coolers); ■ the refractory lining was well-worn but expert opinion deemed it to be in an acceptable condition for a furnace of this age; and ■ a large mass of solidified iron, coke and sinter was found in the base of the furnace. The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 18 of 61 pages
Health and Safety Executive The Energy Department 83 Prior events at the Energy Department, and specifically Margam B Station, had a profound effect as precursors to the accident. The events described below were determined from departmental records, interviews and interrogation of recorded electronic data. 84 Between 30 September and 5 November 2001 there had been a substantial number of problems with the No. 5 Blast Furnace water pumps. During this period, for example, there had been six pump breakdowns and six serious faults reported. Pumps had failed on auto start on a number of occasions – among a range of other defects recorded. The situation was that during this period the overall pumping system had shown a significant lack of reliability. 85 For some time prior to the incident, routinely, the water supply to the No. 5 furnace had been provided by the two electric Sulzer pumps. Steam turbo pump T1 had been out of commission since early October 2001 awaiting the return of a refurbished gearbox. T1 was, significantly, still not available for use in the days leading up to the accident. 86 The provision of full furnace cooling water delivery relied upon the two electric Sulzer pumps. The standby pump was steam turbo pump T2, having the smaller capacity of the two turbo pumps at approximately 34 000 litres per minute. 87 In 1996 the motor for the Sulzer 1 pump was replaced. Because the manufacturers were unable to supply a motor to the specification required, the motor that was available was de-rated. The consequence of this was that it became necessary to operate the motor at circa 98–99% full load current (FLC), not 90% as originally planned. 88 The Sulzer motors were of the induction type. Induction motors are designed to maintain a constant power output. If the voltage falls, the motor draws more current to maintain, in this case, the required pump water pressure and flow. Consequently, if the supply voltage falls, the current increases. 89 When the new motor was installed the thermal overload protector was not altered or adjusted to reflect operation of the motor at 98–99% FLC rather than the original specification. Instead it was set to operate at 110% FLC. 90 The failure to adjust the thermal overload protector reduced the margin of spare capacity from 22.2% to 11.7% – a 47.3% reduction, which was highly significant and crucial. 91 In simple terms the thermal overload protector on Sulzer 1 had not been adjusted to accommodate the higher kilowatt rating of the new motor when fitted. This meant that, on 7 November, it tripped too soon. 92 On the 7 November 2001, a simple maintenance task was scheduled, by the Energy Department, to repair electrical equipment associated with the electrically driven Sulzer pumps. 93 The No. 5 Blast Furnace crew had not been informed of the intention to carry out this work. Communication between the Energy Department and the blast furnace crew had been identified by the company as a problem on previous occasions. 94 The work was found to be necessary due to steam ingress to a transformer control cabinet. To facilitate the repair, electrical feeds were switched and in the process there was a voltage drop of 6.7%, which caused number 1 Sulzer pump to trip out as the current increased. The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 19 of 61 pages
Health and Safety Executive 95 The rise in current was a direct consequence of the reduction in supply voltage. The Sulzer was running at 98–99% of its FLC, too close to its tripping current of 110%; it was highly vulnerable to input voltage shortfalls. 96 There were no written procedures for ensuring that those responsible for switching transformers checked the voltage output, although this was known to be an essential task. 97 At this time, around 09.16, the smaller of the two turbo pumps (T2) automatically came on to compensate when number 1 Sulzer pump tripped out. This pump (T2) also tripped out (on its over-speed protection) within seconds, probably because a steam governor setting was too high, allowing the ultimate (safety) trip speed to be reached quickly (due to speed ‘surge’) after start up. The ultimate trip speed device operated, ‘de-latching’ the pump from its steam supply valve, and shutting down the pump. (The important fact here is that T2 standby failed to come online as it was required to do.) 98 As a consequence the furnace was, for a period of some 10–12 minutes, receiving only approximately 55% of the required cooling water supply. 99 The emergency water tower did not come online as the reduction in water pressure was insufficient to cause this to operate. 100 At around 09.25 the electrical supply to number 1 Sulzer pump was restored. On noticing the initial reduction in the flow of cooling water, the furnace crew, in accordance with established procedures, had ‘dropped the wind’ to reduce the flow of hot air from the tuyères. With the water flow to the furnace restored, the furnace was gradually put back ‘on wind’. A search for leaking coolers was initiated when elevated hydrogen readings were later detected, indicating a water leak into the furnace. The immediate assumption, subsequently proved to have been correct, was that coolers had burnt out because of the reduction in cooling water supply. Leak detection 101 The detection of leaking coolers on the furnace was the duty of technicians among the furnace crew known as ‘watermen’. In any furnace design, but especially one with open-circuit cooling arrangements, the job of detecting leaks was known to be difficult. 102 There were a number of additional factors with No. 5 Blast Furnace which made the task of detecting water leaks even more difficult. They included: ■ the multiplicity of pipework, described by some as being ‘like spaghetti’. This was caused as a consequence of installation of Sorrelor coolers to provide additional cooling at places where the refractory lining had become thin and at other hot spots; ■ open launders into which water from the coolers was discharged had been covered to keep out debris. This hindered and obscured visibility and accessibility in checking for leaks; ■ some water discharge pipes were slipping into the launders and were preventing visibility of outlets; ■ some water discharge pipes had additional flexible hoses attached which ended up at the base of the launders and totally submerged; ■ water outlets were on different landings from the coolers; ■ there were valves provided which, when turned off, would shut off large numbers of coolers at a time. The ability to do this would have speeded up the detection of The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 20 of 61 pages
Health and Safety Executive water leaks. The valves were in poor condition, were not working on 7 November and could not, therefore, be used to isolate banks of coolers at a time. There had been a programme to have the valves repaired in the summer but this was not implemented for budgetary reasons. 103 It should also be understood that the watermen were doing much of their work on the furnace while wearing breathing apparatus, which made an already difficult task even more challenging. 104 Detection of water leaks at furnace No. 5 was, therefore, a difficult task in any event. For it to be done properly it required experienced watermen and an effective system, including labelling and tagging, to identify which coolers had been switched off, checked and switched on again. This was particularly important in the light of the multiplicity of pipework. 105 The day technologist, the most experienced waterman, was not at work on 7 or 8 November. The senior man overseeing and advising the watermen was very inexperienced. The recovery 106 After the pump trips earlier in the morning, by 10.45 on 7 November, the furnace was back up to normal capacity. On bringing the furnace back on to normal operational wind rate, a rise in hydrogen levels in the analysis of the top gas had been noted, indicating the ingress of water into the furnace (the elevated hydrogen readings being due to dissociation of water into its component oxygen and hydrogen molecules inside the furnace). The monitoring screen alarms at 10.11 indicated that the increased percentage of hydrogen was significant (this would normally run at below 2%). Despite attempts by the watermen no leaks could be found. Sometime after 11.30 a decision was made to take the furnace off wind. Subsequently the furnace shutdown was postponed until 14.30 because some molten iron and slag was still being run off the furnace. 107 At approximately 13.00, charging of the furnace had ceased. 108 At about 13.00 an area technologist saw a ‘greeny–yellow’ flame coming from the (boxed-in) lap joint area, around tuyère No. 3, that he believed to be a hydrogen flame and indicative of water ingress. All the tuyères were checked and found to be satisfactory except for numbers 3 and 4, which were described as ‘wet’. Water could be seen dripping within the furnace (through the ‘peep-sights’ of the tuyères). The water system was then rechecked later in the afternoon by experienced contractors, who discovered that a bank of Sorrelor coolers had not been tested. 109 After 19.00 ‘backdrafting’ was undertaken as a prelude to bringing the furnace back on. This is a process whereby there is a reversal of the blast air flow to stoves to ease the pressure within the furnace. 110 At approximately 19.00 three failed Sorrelor coolers on the third landing were identified, bypassed and grouted, effectively isolating them and what was thought to be the source of the leak. These coolers had been leaking since the water starvation that morning, some 10 hours previously. (Subsequent forensic tests indicate that many tonnes of water may have entered the furnace during this period.) At 23.30 the furnace was brought back on wind (at low pressure – 0.35 bar) and charging recommenced. 111 At just after midnight on Thursday 8 November a first attempt was made to achieve a ‘connection’ with molten iron by drilling the tap hole. This and a subsequent attempt were unsuccessful and on the second occasion there was a The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 21 of 61 pages
Health and Safety Executive blow out of ‘orangey’ coloured flame from the tap hole – indicating the presence of hydrogen. This was taken as an indication of a poor connection with molten iron. 112 ‘Lancing’ at the tap hole then commenced. Lancing is the manual use of thermic lances (essentially a long, consumable, steel tube fed with pressurised oxygen gas) to burn into solidified material within the furnace to establish a ‘connection’ with molten liquids, either iron or slag. Lancing is carried out in recovery conditions because it can reach higher areas of the hearth where liquid iron is actually being formed. At 00.30 the first attempt was made to cast (ie run off molten material). Gas flames and some slag were released from the south tap hole but there was no flow of iron. 113 Initially the decision was made to lance ‘horizontally’ at the tap hole. At 01.30, in view of the limited success of horizontal lancing, a decision was made to lance ‘up’, ie lance at an upward angle into the furnace to try to reach molten iron. 114 Lancing continued through the night at an upward angle to the hearth. 115 At 02.00 slag was noted to be entering tuyère No. 20. At 02.30 there was contact with iron and a slow flow obtained. At 03.35 there was what was described as a small run of iron. 116 At 04.45 an area technologist was telephoned at home and advised that difficulty was still being experienced in withdrawing material from the furnace. He arrived on site at approximately 05.30. 117 At 05.15 a decision was taken to use larger 1 inch (25 mm) diameter lances as opposed to the ¾ inch (20 mm) lances then in use. These delivered considerably more oxygen to the tip of the lance, and thus much greater heat. 118 At around 06.00–06.30 there was a shift changeover. 119 At approximately 07.00 it was noted that tuyères 6 and 7 were blocked, that Nos. 16 to 20 were bright and working well, Nos.14 and 15 were reasonably good, but that the others were described as ‘closing’. 120 At 08.00 there was a small run of iron, and between 08.00 and 09.00 there was another run of what was described as ‘poor quality’ iron. 121 At around 10.00–10.30 a progress meeting was held. The consensus of the meeting was that progress was being made and the work would continue to try to run off iron and slag throughout the day. A further review meeting was set for 16.00 that afternoon. Second water ingress (on 8 November 2001) 122 At 12.50 on 8 November, monitored hydrogen levels increased to more than 7%, indicating significant further water ingress to the furnace. At 13.00 hydrogen levels were seen to be still rising, again indicating further water ingress. The furnace remained on wind while watermen on the furnace stack tried to locate the leak. 123 At 15.30 lancing recommenced. Only six tuyères were now noted to be still operating; the remaining 18 tuyères were blocked. 124 At 16.00 the pre-arranged team meeting took place. A number of senior and experienced staff were present at this meeting. Concern was expressed that there might be a risk of an uncontrolled ‘breakout’ of hot metal from the tuyère area. A ‘tuyère breakout’ is where the molten iron or slag penetrates through a failed The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 22 of 61 pages
Health and Safety Executive tuyère. A ‘breakout’ can also happen when molten iron penetrates through the refractory and steel shell of the furnace and flows in an uncontrolled manner from within the vessel. Any breakout represents a very hazardous situation with serious risk to personnel. This risk of breakout was clearly identified as the primary safety concern at that point by the staff involved at the meeting. 125 At the 16.00 meeting a decision was taken to continue with the recovery process until the following morning, when the situation would be reviewed again at 07.00. 126 At approximately 17.12 an employee working close to the tap hole saw something at the lap joint which he believed was possibly an indication of an imminent breakout of slag. He shouted ‘run’. Almost immediately thereafter, the explosion and rupture of the furnace occurred. Conclusions Proximate causation 127 No. 5 Blast Furnace exploded due to significant internal over- pressure brought about by the interaction of water and molten hot materials within the lower part of the furnace. 128 The over-pressure primarily vented itself through the lap joint above the tuyères area, the furnace lifting off its supporting column heads. 129 This event was brought about by: ■ a failure of two of the three available ‘safety-critical’ cooling water pumps, at approximately 09.13 and 09.15, respectively on 7 November 2001; ■ the operation of the furnace on blast for 10–12 minutes with only 55% of its water cooling needs, leading to the overheating of some furnace coolers (circa 09.15–09.26, 7 November 2001); ■ the consequential failure of perhaps three Sorrelor-type coolers, leading to serious water leaks into the furnace (beginning at about 10.00 on 7 November); ■ a prolonged delay in the furnace watermen detecting and dealing with the source of this water ingress; as much as 50–80 tonnes of water entered the furnace by the time the source of the leakage was located and sealed at about 18.30–19.00 on 7 November; ■ the furnace was put into a ‘chilled hearth’, and thereby a ‘recovery’ situation by these events, ie the large amount of water in the lower areas of the furnace had the effect of significantly lowering thermal activity; ■ in the process of attempting to recover the furnace, and following additional leaks on 8 November 2001, a quantity of water came into intimate contact with, and reacted with, hot molten metal and/or hot molten slag, resulting in a massive release of energy leading to an over-pressure of the furnace interior; ■ the furnace lifted some 0.75 m off its column heads. The large bolts between the furnace supporting columns and its circumferential lintel had been fractured some significant amount of time before the explosion and offered no impediment to this motion. The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 23 of 61 pages
Health and Safety Executive Precursor causative matters 130 There were significant precursor events going back many months, indeed years. Many relate to the operation of the Energy Department and the furnace Extension Committee. The British Steel Audit Reports (1994 and 1999) had identified a number of these precursors in advance of their manifestation. 131 Some notable precursors were: ■ the failures of the pumping system on 7 November were part of a continuing and deteriorating pattern of failures. There were a series of serious pumping problems in the weeks before 7 November; ■ the two pumps (Sulzer 1 and Turbo T2) that failed on 7 November were set to operate unduly close to their tripping criteria. The safety margins were thereby reduced significantly. Moreover, the latent shortcomings of Turbo T2 (governor and trip device faults) were not detected and remedied prior to 7 November 2001; ■ these technical problems were matched by procedural weaknesses in the Energy Department. Of particular importance was the total lack of written procedures for reliability-sensitive maintenance work; ■ training and supervision of key energy personnel were inadequate; ■ the communication arrangements within the Energy Department, and between the Energy Department and furnace staff, were not sufficiently robust; ■ the Port Talbot Energy Department was recommended in 1994/95 to carry out assessments of the durability of the No. 5 water cooling systems with a view to securing their reliability to the end of the extended life of the furnace. This important work was not carried out; ■ insufficient steps were taken to ensure the long-term safety of the systems. The water cooling system as a whole was not seen as safety critical. This was a fundamental contributory factor; ■ no safety professional, reliability, or risk assessment experts were members of the furnace Extension Committee, nor were any involved in its work; ■ there had been no effective maintenance of the column head/lintel bolts. Had these been intact, it is possible that the lap joint may not have opened (although there is the possibility of the furnace rupturing elsewhere had the over-pressure been sufficient). Lessons and recommendations Safety management Lesson 1 The company should review the role and function of the Safety Department. It should be better integrated into operational and engineering management. 132 This was a criticism levelled at British Steel as far back as 1975 following the Appleby-Frodingham furnace accident in which 11 men died. The investigation of the No. 5 Blast Furnace event of 8 November 2001 revealed little involvement of the Safety Department in, for example, process risk evaluation, during the critical campaign extension debates. The Safety Departments within the company are professional, competent, and relatively well resourced. However, integrated use of this competency in dealing with changes in risk profile etc was found to be patchy. Production management did not regard the professional safety advisers as having a significant role to play in change management. This has been addressed through a review of the functions of the Safety Departments and an examination of how the Engineering and Production Departments manage change. The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 24 of 61 pages
Health and Safety Executive 133 It is recognised that with the impact of the Control of Major Accident Hazards Regulations 1999 (COMAH) and the regimes that they bring with them, that the company’s approach to process safety has inevitably changed in many respects. However, it is essential that the Safety Departments are fully consulted in respect of significant process changes, even where the full weight of COMAH Regulation compliance is not involved. Had there been greater and more direct involvement of the professional resource that the company already possessed in the field of safety, the likelihood of an event such as occurred on 8 November 2001 could have been significantly reduced. Lesson 2 Blast furnaces are now under the COMAH regime, where identification and evaluation of major hazards is a legal requirement. Before this, predictive tools and techniques have had relatively limited use within the steel industry. Predictive tools for the assessment and management of risk should receive greater use within the steel industry and other process industries: eg Hazard and Operability Studies (HAZOPS), Failure Modes and Effects Analysis (FMEA), Fault Tree Analysis (FTA), Process Hazard Review (PHR), and Layers of Protection Analysis (LoPA). 134 There was little evidence that any of the well-established predictive tools used in other high-hazard industries had widespread use at the time within the company – or indeed the steel industry generally. (Fault Tree Analysis had, however, formed part of the company’s preparation during 2000 for their COMAH submissions). This is changing with the changes in legislation (eg COMAH), but there is a role in a wider sense. Levels of predictive techniques competency outside the Safety Departments were low; use of the techniques were equally low. Use of these techniques might well have identified and eliminated some of the earlier precursor events leading to the furnace explosion. Cooling water Lesson 3 Sufficient cooling water for furnaces should be available at all times; the supply systems should have an adequate level of reliability built into the system. This reliability should be brought about by good engineering design (including an adequate level of redundancy) and suitable maintenance, and should be monitored to indicate any threats to its integrity. 135 The levels of reliability of the water delivery systems had not been properly evaluated on the basis of risk identification. Such reliability as existed had been brought about by ‘custom and practice’ design, largely based upon continued production requirements, not by any rigorous attention to risk evaluation. A more critical approach would certainly have identified potential and actual threats to system reliability. studies. Lesson 4 Reliability engineering techniques should be employed to identify safety-critical plant and appropriate safeguards should be developed from these 136 Safety-critical plant had not formally been identified as such. Identification of plant whose function was essential had largely been on the basis of threats to production losses and identification of maintenance scheduling issues. The various ‘critical’ plant items and systems were not so identified on safety grounds although there was evidence post-accident that individual managers and technicians on site had recognised certain safety-related issues associated with critical process plant before the event. The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 25 of 61 pages
Health and Safety Executive Lesson 5 Closed systems for furnace cooling water, or systems with equal or better reliability, should be provided wherever reasonably practicable. 137 Closed system cooling arrangements offer considerable advantages over ‘open’ systems for rapid leak detection and are much more amenable to the fitting of diagnostic tools such as flow meters, make-up water determination etc. They are more reliable in terms of keeping the cooling circuits free from contaminants etc and are therefore an aid to better cooler maintenance, reducing scaling and fouling of the circuits. 138 The use of open-system cooling is historical, and lent itself to fairly accurate leak identification, monitoring etc, assuming the existence of long-serving, experienced watermen. Even with this proviso, however, all the evidence is that open systems are fundamentally much more vulnerable to fouling, corrosion and associated problems. With the advent of more modern technology for monitoring, and the possible lack of very experienced operators, closed systems will almost certainly prove far superior and reliable if properly designed, installed and maintained. Leak detection Lesson 6 Speed in locating furnace cooling water leaks is essential. Rapid leak detection relies on good engineering, adequate detection protocols, and suitably trained and competent operators. All operators of water-cooled furnaces should ensure that there are adequate measures in place to facilitate prompt leak detection. 139 The extent to which the delay in locating the various leaks into the furnace was crucial to the eventual extent of the furnace ‘chill’ and the final event of free water interacting with molten materials was substantial. Earlier leak detection on 7 November would have greatly reduced the risk of a severe furnace chill developing. There were significant predisposing features to the delay in finding the water leaks. Questionable training, experience and competencies, poor layout of pipework, inadequate cooler identification, and lack of easily implemented, systematic leak detection procedures all caused significant delays in dealing with a rapidly worsening situation. The fact that watermen working above tuyère level have to wear breathing apparatus to deal with the risk of carbon monoxide poisoning was also a significant addition to the physical difficulties involved in leak detection. 140 The provision of all reasonably practicable instrumentation and monitoring equipment, plus high levels of training and competencies among the operators should be paramount if water leakage is to be quickly identified and stopped. There should be clear leak-detection protocols for the actual process of leak detection, such that it can be carried out in an efficient and effective manner. Lesson 7 On water-cooled metallurgical furnaces, where it is reasonably practicable, appropriate instrumentation, specifically designed for leak identification, should be installed to give earlier and more precise detection of leaking cooler elements. 141 There is little evidence that sufficient thought had been given to additional safety-related instrumentation for cooling water monitoring since the original build of the furnace. Although such instrumentation might have been of only limited accuracy, it may have been sufficient to attain some substantial risk reduction. The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 26 of 61 pages
Health and Safety Executive Retrofitting modern diagnostic technology had not been sufficiently considered; instead, reliance had been placed upon experienced and competent individual employees – employees who at the crucial time were, in some cases, not available. Maintenance Lesson 8 Maintenance, inspection and, where appropriate, testing of plant and equipment associated with the reliable delivery of water to furnaces should be paramount. The potential effects of lack of maintenance, inspection and testing in terms of safety should be clearly understood. There should be adequate prior communication between works departments when any maintenance or other work that may potentially affect safe plant operation or reliability is proposed. Formal protocols should be considered for this. Safety-critical items should be identified and protocols and priorities established for their maintenance, inspection and testing. 142 Safety-critical hardware components had not been identified as such. Had they been, other actions presumably would have been taken, eg in respect of the T1 turbo pump gearbox. 143 There was an important crisis precipitated due to the misunderstanding in respect of the planned work on the electrical equipment that led to the tripping of the Sulzer 1 pump. Whatever happened (there is conflict in the evidence on this matter), communication systems were not robust enough and the blast furnace personnel were ultimately unprepared for the loss of cooling water on the morning of 7 November. 144 The failure to inform the furnace team of the proposed switch of transformers meant that they had no opportunity to consider whether to reduce wind. Reduction of wind would, of course, have greatly reduced the risk of the coolers overheating in the event of any reduction in the water supply. 145 When the furnace crew did become aware of the loss of water they reduced the wind – but this took time. Additionally, they were at a position in time where the liquids in the furnace were at a high level – not an ideal time by any means, and not one that would ever have been chosen for process excursions. 146 There were no formal protocols in place for such work – confusion, misinformation or simple misunderstanding was inevitable at some stage. Blast furnace recovery and abnormal plant conditions Lesson 9 The specific process of conducting a blast furnace recovery gives rise to additional risks significantly over and above normal operational risks. It is essential that all personnel involved are aware of those risks and there are control measures, including arrangements for effective communication, in place such that adequate risk control is maintained. 147 Post-event it was clear that some personnel involved had little knowledge of precisely what significant risks attended a furnace recovery. Those risks that were foreseen (eg a tuyère breakout) were not adequately communicated to all employees at risk. Control measures even for the foreseen risks were not adequate, for instance, there were a number of unnecessary personnel on the cast house floor after a tuyère breakout risk had been (correctly) identified. Several of these personnel were completely uninformed about the levels of risk to which they were exposed, and need not have been present. The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 27 of 61 pages
Health and Safety Executive Lesson 10 A specific issue with the recovery of No. 5 Blast Furnace was that as it developed, there was an incomplete knowledge of the changing status of the furnace. During abnormal plant conditions there should be a competent senior manager detailed to retain an ‘overview’ of the developing situation and to keep a specific watching brief on critical parameters, so as to be able to inform those more intimately involved in dealing with the abnormal situation. Specific parameters in the case of blast furnace recovery operations should include such critical data as liquid iron levels, hydrogen levels and trends. 148 The evidence of the investigation showed that there appeared to be no one with an overall ‘watching brief’, at a distance from the developing crisis. This manifested itself in a number of ways. For example, even following extensive investigation there remains disagreement as to who knew what, and who was taking decisions on the crucial hydrogen level within the furnace on the afternoon of 8 November. This was an important parameter in the decision-making process, but it remains controversial among those who were there. 149 Another significant parameter was similarly not sufficiently considered in a methodical way – the rising iron levels within the furnace that threatened to endanger the tuyère coolers and produce a water/hot metal event. There was no direct way to measure this, but the skills were present to enable a fairly accurate calculation to have been made and acted upon; this was not done in any effective, structured way. Senior personnel who could have fulfilled this watching brief role were instead ‘leading from the front’ in attempting to recover the furnace, rather than retaining a more objective view. Management of change Lesson 11 A formal system of pre-modification risk assessments should be instituted for any changes (including changes to operating parameters) proposed to safety-related plant and equipment. This should be coupled with post-modification safety reviews. The management of change system should include evaluation and assessment not only by the engineering and operational functions, but also by appropriately experienced and competent safety professionals. Duties and responsibilities for this should be clearly identified. Changes to the physical characteristics of plant should be carefully assessed for any impact on risk profiles and should be carried out with best engineering practice. All such changes should be carefully recorded and subsequently re-evaluated to determine their actual operational impact. 150 There was an absence of systematic evaluation of risk profile changes brought about by the large number of engineering changes undertaken on the furnace over many years. Some of these changes were unimportant and inconsequential, some, ultimately, quite significant in their effect, either individually or cumulatively. 151 Changes were not accompanied by risk re-evaluation to determine their actual operational impact. A prime example was the ad hoc addition of Sorrelor coolers in critical positions on the furnace, with their location poorly recorded and their water supply pipes often taken from the nearest available delivery source – sometimes from the landing below the cooler location. This had a profound effect on the ability of personnel to carry out speedy leak detection. The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 28 of 61 pages
Health and Safety Executive Decision making Lesson 12 In emergency situations, there should be management arrangements such that there is a clear ‘line of responsibility’ for decision making. There should be no doubt whatsoever as to who is making which decisions. 152 Recent changes to working patterns and the introduction of the ‘Team Working’ protocols within the company had clearly been imperfectly understood by individuals, for whatever reason. 153 The managers and technicians involved during the period of the recovery were very experienced and individually competent furnacemen, but there was considerable doubt in many minds as to what the chain of command actually was, and precisely who was making crucial decisions. In particular, doubt remained as to who was responsible for any decision to take the furnace ‘off’ and end the recovery process. This may well have led to events leading the decisions, rather than decisions dictating control of events. This is not an acceptable condition in the middle of dealing with high-risk abnormal plant conditions; there should be much greater clarity of responsibility and command in such situations. Lesson 13 Decisions made by managers under pressure from adverse plant or process conditions present a potential source of significant error. Adequate training and experience is essential, but more precise decision-making protocols should be available for foreseeable circumstances to guide and inform decision making. Careful consideration should be given to providing emergency event simulation training etc to build operator confidence and skills in emergency or abnormal process conditions. 154 Personnel under pressure, no matter how well trained or competent, are at increased risk of error when making decisions. The managers and senior operators dealing with the furnace recovery were operating in difficult, unusual, process conditions. Adequately precise decision-making protocols were not available to help these individuals – they were largely reliant on experience and ‘informed judgment’. The evidence is that this was ultimately insufficient, and it is not surprising that errors were made. The opportunity for building experience in respect of abnormal plant operation is limited on a continuous process plant. Abnormal process conditions are exactly that – not routine or normal, and can be very infrequent. The support engendered by rigorous, carefully evaluated protocols for foreseeable process excursions would be of significant value for personnel in these difficult situations. While not eliminating the need for informed judgments, properly designed protocols would clearly identify where those judgments are needed, and provide the necessary supporting framework. 155 A number of the personnel present had little or no previous experience of dealing with a furnace chill this severe. The watermen in particular were relatively inexperienced in dealing with rapid leak detection in circumstances where methodical work at speed was crucial. 156 Process conditions such as recovery of a furnace, breakouts, power failures, loss of other services etc are by definition relatively infrequent events. The opportunities for training and experience building are therefore few. This is not a situation unique to the steel industry. A method of dealing with this type of challenge is the use of ‘table-top’ and ‘simulation’ exercises. These and other techniques, can create intensive experience-building opportunities for all levels of staff, and enable problems to be identified and dealt with in a safe, risk-free environment, where mistakes and errors can be turned into valuable learning aids, not potential disasters. The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 29 of 61 pages
Health and Safety Executive Design issues Lesson 14 Opportunities to achieve risk reductions by radical design improvements on blast furnaces are very infrequent. The design of new or extensively rebuilt furnaces should take into account the need to improve the reliability of cooling water supplies and to have suitable pipework layout, valve arrangements and water monitoring systems so as to facilitate prompt leak detection and remedial action. 157 The opportunities for radical improvements in control of safety on blast furnaces are limited by a number of features, not least of which is the infrequency of reline or rebuild. However, there will be opportunities for a rethink of critical items such as instrumentation or basic engineering control improvement – especially with cooling water. One feature of furnace design and operation is clear – cooling water use is continually increasing and is often a determining factor in furnace life. Every window of opportunity should be taken to improve control of this issue. 158 The evidence is that cooling water changes brought about on No. 5 Blast Furnace were assessed and implemented on the basis primarily, if not exclusively, on the ability to achieve more cooling and therefore continued and greater output. There is little evidence to support the view that sufficient use was made of engineering stops to improve, for example, leak detection or redundancy issues. Lesson 15 The provision of improved monitoring systems, purpose-built for monitoring cooling water parameters on blast furnaces, should be considered. Safety-specific instrumentation of adequate precision should be designed and installed to address specific foreseeable operational and abnormal operating conditions. 159 The post-accident investigation used a considerable amount of recorded electronic data to try to interpret events. This data came from a variety of sources on the furnace: thermocouples, pressure sensors, flow meters, gas analysers etc. None of the equipment had been installed with a primarily safety-related function. It supplied data that was subsequently exploited for safety and incident analysis, but it was not specifically designed for this purpose. There is now available a range of technology which could easily be retrofitted to existing furnaces for the specific monitoring of safety-related parameters both in the normal run of production, and, importantly, for foreseeable abnormal excursions. 160 There should be a detailed review of the need for such instrumentation based upon the foreseeable furnace excursions that are recognised as credible, albeit infrequent, events. The instrumentation should be properly designed and installed with a view to providing operators with information on the precise parameters that foreseeable process abnormalities would generate as risk-critical. 161 The review process should be undertaken by competent furnace operators, safety professionals, and control and instrumentation engineers. Human factors Lesson 16 It is essential during abnormal plant or process conditions that all personnel are clear as to who is responsible for decision making and that they have provided adequate lines of communication. Employees should have a precise and clear view of their roles and responsibilities, and be supported by suitable training, procedures and other job aids. The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 30 of 61 pages
Health and Safety Executive 162 There was clearly confusion among several of the employees as to who was actually in charge on the cast house floor. Lines of communication were unclear during the recovery. Several people were at risk who need not have been, had communication of the risk levels been adequate and had they understood the actual condition of the furnace at the time. This was true both for the event as it occurred, and the events that were actually foreseen as credible risks, eg tuyère breakout. Lesson 17 The awareness of the danger of water/metal and water/slag explosions should be raised among all employees engaged in processes where this is a risk. The degree of risk presented by molten materials coming into contact with water continues to be not fully appreciated. 163 The assertion was made by some experienced employees that water on metal was somehow relatively ‘safe’ and that water ‘under’ metal (or slag) was the danger to be avoided. This is not always true: water and molten metal/slag contact of any sort should always be regarded as potentially very hazardous. Generally, water lying undisturbed on top of molten metal or slag will merely boil off to steam. However, there are foreseeable conditions where water on top of molten metal can still be extremely dangerous. This point was made following the Appleby-Frodingham Inquiry in 1975 (British Steel, 1976): ‘It was a known fact that it was extremely hazardous to pour hot metal or slag onto water and it was relatively safe to pour water on to hot metal/slag in situations where little danger of entrapment of the water by hot metal existed. However the incident has highlighted a third situation, namely where water comes into contact with hot metal in a confined space, such as a torpedo ladle, or in any other situations where the possibility of entrapment exists...’. 164 There needs still to be a re-evaluation of the collective experience on this subject. The received wisdom on this matter within the molten metals industries is not necessarily always accurate and can lead to failure to correctly evaluate the risk presented by water and metal contact. 165 HSE has investigated a number of serious molten metal/water explosions that have occurred subsequent to water being initially on the surface of the metal and safely boiling off. Almost any physical disruption of this relatively stable state can lead to catastrophic consequences. This disruption can come from simple movement of the system, breakdown of the water/metal interface, or the inability of the steam generated to have sufficient room to escape. All water/metal interactions should be considered as potentially very hazardous. 166 There is a need for a perception-shift within the industry on this matter, and it should be brought about through the risk assessments and training processes for all jobs and tasks involving molten materials were there is possible water interaction. Lesson 18 The process risks associated with safety-critical plant, especially ageing plant, should be thoroughly understood through rigorous assessment processes, with these being subject to regular review. Specifically, with water systems on blast furnaces, a ‘leakage tolerant’ attitude should not be allowed – especially with older furnaces. Such raised acceptance of water leaks increases the risks of an adverse event occurring at some point. 167 The investigation showed that there was a substantial difference in the occurrence of water leak events, on a routine basis, over a long period of time, between the older No. 5 furnace and its newer neighbour, No. 4 Blast Furnace. The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 31 of 61 pages
Health and Safety Executive This may have been indicative of a ‘leak tolerant’ culture developing at No. 5 Blast Furnace because of its history and age. This was potentially a serious development as it invoked a mindset of accepting leaks as inevitable on the older furnace. Water leaks had clearly been identified by senior managers as being the potential determining feature for the final conclusion of the operation of the No. 5 furnace – there is little evidence that this had actually led to better leak prevention and detection on this furnace. Actions – the company 168 No. 5 Blast Furnace was demolished and rebuilt to a more modern design – one which does not feature a lap joint. 169 There was a substantial Company Panel of Enquiry conducted according to established company procedures. This Panel included management, technical, and trades union representatives. A number of industry-recognised experts were consulted. 170 An Investigation Report and Recommendations were produced by Corus UK Ltd as a result of this process. 171 The main actions following these reports were: Working procedures 172 In the event of failure to remove liquids from the furnace or to achieve good tap hole blast connection for a maximum of two hours, the furnace will be taken off blast for review. 173 Procedures for dealing with water ingress have been thoroughly reviewed. 174 A chilled hearth situation will now involve taking the furnace off blast for formal risk assessment reviews. 175 Recovery procedures have been amended. 176 A new role of ‘panel monitor’ has been created. This is a competent individual whose sole function will be to monitor furnace operational parameters at all times. 177 The role of team leader has been modified to now involve two individuals: one on the cast house floor, one in the control room. Furnace design 178 The new furnace has a closed water cooling system for stack and bosh areas. The provision for leak detection and control is greatly improved. 179 The tap hole-to-tuyères distance has been increased to 3.9 m at the new furnace. 180 A computer program has been developed to aid estimation of liquid levels within the furnace. 181 Top gas analysis has improved. Hydrogen levels can be detected sooner. 182 Overall computer systems for monitoring have been improved. The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 32 of 61 pages
Health and Safety Executive 183 The new control room is situated remotely and provides greatly enhanced operator protection. 184 Blast walls at critical valve manifolds have been improved. Energy Department 185 A new control standard for voltage monitoring has been put in place, especially at switching operations. Alarm systems have been incorporated. 186 Switching operations will require prior information to be given to the blast furnace operators. 187 Alarms have been fitted to the electric Sulzer pumps to provide ‘high current’ alarm. Actions – Health and Safety Executive 188 The nature and matters surrounding the deaths of the three Corus employees in the incident legally required that there be a Coroner’s Inquest with a jury. The finding of the 17-day Coroner’s Inquest was ‘Accidental Death’ in each case. 189 Following extensive consultation with the Police and Crown Prosecution Service, and with the benefit of detailed legal advice from HSE’s Legal Office, and Counsel, two charges under the Health and Safety at Work etc Act 1974 were laid against Corus UK Ltd. 190 These charges alleged breaches of sections 2(1) and section 3(1) of the Act. (Section 2(1) of the Act relates to company duty to employees, section 3(1) relates to company duties to non-employees, ie contractors and members of the public.) 191 The company was subsequently prosecuted in the Crown Court and pleaded guilty to both charges. Corus UK Ltd was ordered to pay a fine of £1.33 million, with £1.74 million costs also being awarded. The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 33 of 61 pages
Health and Safety Executive Appendix 1 Photographs Figure 3 General view of the blast furnaces at Port Talbot. No. 5 furnace (and associated stoves, gas plant etc) is to the left, No. 4 furnace to the right The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 34 of 61 pages
Health and Safety Executive Figure 4 Rear view of No. 5 Blast Furnace The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 35 of 61 pages
Health and Safety Executive Figure 5 View of cast house floor shortly after the explosion Pumps Figure 6 Margam B Power Plant showing furnace water pumps The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 36 of 61 pages
Health and Safety Executive Figure 7 Furnace steam turbo water pump Figure 8 View of steam governor The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 37 of 61 pages
Health and Safety Executive Appendix 2 The cooling system Coolers 1 As part of HSE’s investigation, HSL was asked to carry out tests in an effort to determine the amount of water ingress from the blast furnace cooling system into the furnace prior to the rupture on 8 November 2001. 2 Water pressure tests to locate failed coolers on the furnace stack and on the bosh were carried out in situ during the period over which the furnace was dismantled. The entire stack, bosh, tuyère jacket, lintel stave and Sorrelor cooling systems were pressure tested in situ. The following coolers were found to have leaks: ■ two Sorrelor coolers positioned above tuyères 6 and 22; ■ six copper flat coolers in the bosh above the north tap hole; and ■ tuyère numbers 2, 3, 7, 8, 13, 16, 17 and 20. 3 In addition to in situ testing, water flow-rate tests were carried out at HSL on one bosh cooler bank and three discrete bosh flat coolers at a supplied pressure of 2.5 bar gauge. The water flow rate through each damaged bosh flat cooler was calculated from the amount of water collected from the discharge over a timed period. This would represent the maximum water flow able to enter the furnace from the damaged coolers prior to the incident and was measured as 750 litres per minute (44 m3/hr). The water flow rate from one bosh cooler, number 34/4, was 520 litres per minute (31 m3/hr). (Note: One cubic metre of water weighs one metric tonne.) 4 These findings do not necessarily establish the actual extent of water ingress into the furnace prior to the incident. They represent the maximum water flow rates and hence quantities that may have flowed into the furnace. The coolers tested were only those which did not appear to have suffered mechanical damage during the dismantling phase, ie only those coolers where evidence of thermal damage was apparent. It remains possible that some of the thermal damage may have occurred during or after the accident. 5 It should also be noted that several of the Sorrelor coolers had been sealed off prior to the incident on 8 November 2001. As it was not known when those Sorrelor coolers had been sealed off, they were excluded from the water flow-rate tests. The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 38 of 61 pages
Health and Safety Executive Figure 9 Examples of coolers: a section of dismantled furnace shell (minus the refractory lining). The yellow-sprayed coolers are Sorrelors, the darker lozenge-shaped coolers are plate coolers The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 39 of 61 pages
Health and Safety Executive Figure 10 Sorrelor cooler showing inlet and outlet connections Figure 11 Plate cooler showing inlet and outlet connections The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 40 of 61 pages
Health and Safety Executive Figure 12 Example of burnt-out Sorrelor cooler The explosion of No. 5 Blast Furnace, Corus UK Ltd, Port Talbot 41 of 61 pages
Health and Safety Executive Figure 13 Example of burnt-out plate cooler The explosion of No.5 Blast Furnace, Corus UK Ltd, Port Talbot - 8 November 2001 42 of 61 pages
Health and Safety Executive Figure 14 Dismantled furnace section showing coolers The explosion of No.5 Blast Furnace, Corus UK Ltd, Port Talbot - 8 November 2001 43 of 61 pages
Health and Safety Executive Appendix 3 Refractories The refractory lining 1 HSE and HSL assessed the extent of the damage to the furnace refractory resulting from the incident on 8 November 2001. It also considered the campaign history of the furnace, the effect that this would have on the refractory lining and the relevance of this to the incident itself. 2 The HSL investigation involved a complete assessment of the state and extent of the refractory lining as observed during the dismantling process and the examination of core samples of evidence of lining failure and to assess the extent of wear. The investigation reached the following conclusions: 3 Overall the state of the refractory liners in No. 5 Blast Furnace was as could reasonably be expected after a campaign of this length. 4 Refractories in the top cone and off plates were found to be in good condition and had not suffered major damage or cracking as a result of the incident on 8 November 2001. 5 Most elements of the throat armour had been removed in the latter part of the campaign and not as a result of the incident. Mid-campaign repairs to this part of the furnace were found to be increasingly necessary to maintain the original internal circular lining contour which is necessary for optimum operation of the material charging system in use at the plant. 6 The refractory lining in the upper and mid-stack was in good condition with less than 50% protrusion of the cooler plate length exposed. Little or no evidence was seen of the 100 tonnes of silicon carbide gunning material applied into the mid stack in June–July 2001. 7 Notwithstanding that the 1989 reline (prior to the campaign in question) included the extensive use of high-quality silicon carbide refractory backed by plumbago in the lower stack, the upper parts, specifically cooler rows 6–10, suffered the most severe refractory wear. 8 The bosh design/configuration is somewhat unique to the Corus operation in South Wales. The system had been successfully developed, initially at Llanwern, in the 1970s and was subsequently incorporated into No. 5 Blast Furnace and No. 4 Blast Furnace at Port Talbot. The design is based on closely spaced, high quality copper internal plate coolers which are welded to the shell in combination with a relatively low-duty aluminous fire clay refractory. The latter has a low thermal conductivity but is less prone to cracking in certain temperature regimes. The density of the cooler spacing is increased so that the working lining contour is maintained further away from the steel shell and there is less chance of breakout. It appears that the system worked well throughout the campaign, but measurements taken during the dismantling process indicate that the lining was becoming extremely thin in critical areas of the bosh above tuyères 17–22 immediately before the incident. 9 Refractory in the lining in the bustle main was in good condition but there had been excessive slag encroachment, particularly in the north, east and west sectors. It is thought that the majority of this slag may have been deposited prior to the incident in November 2001. However, slag of higher fluidity and different colouring and texture was found in the bustle main above tuyères 20–22. It is thought that The explosion of No.5 Blast Furnace, Corus UK Ltd, Port Talbot - 8 November 2001 44 of 61 pages
Health and Safety Executive the more fluid slag may be more closely associated with the incident on 8 November
- Post-incident surveys carried out by Corus and HSE showed that whereas
most of the blow pipes were blocked, many of the down legs were still clear or only partially blocked, particularly in the 12–21 tuyères sector. 10 The hearth was in good condition, as were its refractories, in spite of the incident. Figure 15 Interior of furnace stack prior to refractory removal The explosion of No.5 Blast Furnace, Corus UK Ltd, Port Talbot - 8 November 2001 45 of 61 pages
Health and Safety Executive Appendix 4 Recovery of a blast furnace 1 A ‘chilled hearth’ or ‘chill’ is a loss of thermal activity in the hearth area. It is usually caused by water ingress or burden slip, ie the sudden downward movement of cold materials charged to the top of the furnace such as coke, limestone and iron ore. The consequences of a chilled hearth can possibly require shutting down of the furnace, in addition to increased risk of adverse events such as uncontrolled furnace breakout. 2 The process of bringing a furnace back to its normal operating use following a chill is known as ‘recovery’. Recovery is also required if a furnace has been off blast for a period of time. 3 The recovery process may be relatively short and straightforward or a much longer and more complicated process requiring careful management. 4 The objective of a recovery is to regain lost thermal activity in the bosh (eg following water ingress) to ‘dry out’ water contamination caused by water in the hearth area and to return to full blast delivery. 5 Recovery may involve a number of different measures taken by the operators of the blast furnace, including increasing the level of coke being added to the furnace. This increases the level of combustible materials at the bosh and hence increases the likelihood of further thermal activity. Blast rate can, in addition, be reduced. 6 It is important to tap iron and slag that has already been formed. Failure to do so can lead to rising liquid levels and a breakout – this is the loss of containment of molten material, generally iron, through the furnace structure into the cast house. An uncontrolled breakout is clearly very dangerous. It is especially likely if molten iron levels within the furnace reach the water-cooled tuyère noses. 7 It is vital that liquids that are being produced (iron and slag) are drained away from the tuyères. 8 Lancing is a recognised technique used to tap off liquid slag and iron. It is the use of a thermic lance (a steel tube fed with pure oxygen) which is inserted into the furnace via a tap hole to burn off materials and allow liquids to run off. In addition to attempting to burn a hole into contact with the liquids known to be in the furnace, another purpose of lancing is that it introduces additional combustion and therefore thermal activity into the furnace. The objective of this is that the number of tuyères that are active can increase and a normal ‘raceway’ effect can be established. (A raceway is an active reaction area in the front of the tuyères.) The explosion of No.5 Blast Furnace, Corus UK Ltd, Port Talbot - 8 November 2001 46 of 61 pages
Health and Safety Executive Appendix 5 Mechanism of the event The mechanism of the rupture 1 A major part of the HSE/HSL investigation focused on the precise mechanism of the rupture at No. 5 Blast Furnace. 2 Five possible theories of failure were considered. They were: (i) An induced molten metal/water interaction caused an immediate and significant furnace over-pressure leading to its failure by separation at the lap joint causing the bosh, belly and upper stack assembly to be launched vertically to a height approaching 0.75 m. (ii) A significant vaporisation of water, initiated by radiant exchange between coke burden/slag and displaced water, caused sufficient pressurisation of the furnace to result in (i) above, although perhaps with a much lower, albeit sustained, pressure over a period of about 5–6 seconds. (iii) Molten iron in the raceway above the chilled hearth and surrounding the active tuyères accumulated and, as its level rose to contact one or more tuyères, these started to burn through, allowing high-pressure water to become intermingled with molten materials sufficiently to cause rapid vapour generation and the further explosive interaction sufficient to separate the furnace. (iv) An event such as (iii) above caused alternatives (i) or (ii) above. (v) An event such as described in (iii) above caused a massive burden slip and compression of gas sufficient to cause separation. 3 The significant feature is that all the above models require a water/hot material interaction. Figure 16 Simple diagrams showing movement of furnace during event (a) Prior to event The explosion of No.5 Blast Furnace, Corus UK Ltd, Port Talbot - 8 November 2001 47 of 61 pages
4 Health and Safety Executive (b) Furnace movement during explosion The precise mechanism of the events within No. 5 Blast Furnace on 8 November 2001 has so far resisted definitive determination despite considerable analysis by a number of experts, both from within the industry and HSE. The precise mechanism and extent of over-pressure remains disputed. 5 The one feature that all investigators have agreed upon is, however, that the explosion was without doubt brought about in some fashion by the interaction of water and hot molten materials in the lower reaches of the furnace. The explosion of No.5 Blast Furnace, Corus UK Ltd, Port Talbot - 8 November 2001 48 of 61 pages
Health and Safety Executive Appendix 6 Protective clothing 1 Firstly, it should be clearly understood that the protective equipment being used at the time of the accident was primarily designed and manufactured to protect against relatively minor molten metal or slag splashes. It was most certainly not designed or constructed to protect wearers against the type of event which actually occurred on 8 November 2001. 2 All personnel – employees of Corus and contractors – were supplied with and required to wear appropriate personal protective equipment (PPE), in accordance with the requirements of the Personal Protective Equipment at Work Regulations
- The equipment is provided to give protection from basic mechanical hazards,
environmental hazards (such as noise) and protection from hazards associated with the blast furnace process. The equipment comprised foundry boots, appropriate standard jacket and trousers, protective helmet, visor, gloves and hearing protection. 3 The personnel at work on the furnace stack at the time of the explosion were also wearing self-contained breathing apparatus as a precaution against poisonous blast furnace gas which may be present at higher levels on the furnace. This is a routine precautionary measure above the tuyère belt area. All personnel were equipped with personal electronic gas monitors for the detection of blast furnace gas. 4 As part of the investigation equipment removed from the three deceased and other personnel was inspected and analysed by HSL. The examination confirmed: ■ the majority of personnel were wearing the PPE supplied by Corus. A number of items of PPE that should have been worn were not received at HSL. It cannot be said with any certainty whether items missing were not being worn at the time of the incident or were removed at the site by colleagues or emergency personnel offering assistance to the injured; and ■ the majority of the clothing appears to have afforded the protection from metal splashes reasonably expected of it. Where sustained contact with hot metal was suspected the outer clothing was breached but in many cases further penetration was halted by under clothing. Only in the most severe cases did penetration occur through underlying clothing. 5 The overall conclusion reached by HSE was that the personal protective equipment performed to, or exceeded, the standards to be reasonably expected of it, and that in many cases where the demands on it exceeded its design criteria, it nonetheless substantially mitigated the injuries actually suffered. The explosion of No.5 Blast Furnace, Corus UK Ltd, Port Talbot - 8 November 2001 49 of 61 pages
Health and Safety Executive Appendix 7 Lintel bolts 1 Plans and drawings of the plant indicate that there were originally 64 bolts fixing the furnace lintel to its eight supporting columns. This would be by eight bolts on each column. 2 The bolts and columns had been subject to modification before the incident on 8 November 2001. At least four bolts had been removed and there was evidence of weakening of the nut/threaded shank on a further 16 bolts. The evidence suggests that on 8 November 2001, 44 original bolts and 18 bolts of reduced strength were in place at the lintel/columns. 3 All of the bolts between the furnace lintel and seven of the supporting columns had failed. On the eigth column (designated Column 3) the weld between the upright section and the top mounting plate had failed. 4 The failings of the bolts were mechanical in nature. The most common failure mode was brittle fracture. A small number of bolts, most of which were on Column 7, had been subject to ductile failure. Thread stripping failure had occurred in a small number of bolts but only in those with modified nuts (some nuts had apparently been flame cut to increase accessibility during furnace assembly to facilitate construction). 5 There was significant corrosion of the fracture surfaces produced after the bolts and the weld failed. 6 The nut end of column bolts on the exterior of the furnace had been subject to severe corrosion and in a few positions the nuts were not found when the furnace was dismantled. 7 The bolts had been manufactured from a range of steel types. Testing indicated that the bolts would have had significantly higher strength than the minimum required for the relevant grade shown on the furnace engineering drawings. 8 The steels used in the manufacturing of the bolts were susceptible to brittle fracture at ambient temperatures and/or higher rates of loading. 9 The characteristics of the corrosion on the fracture surfaces were similar to corrosion found on original surfaces situated near the fracture sites. 10 Accordingly it was concluded that the fracture surfaces had existed and had been subject to corrosion over a considerable period of time before the incident. 11 The similarity in the corrosion suggests that the bolts and welds had fractured some years before the explosion. 12 The most likely reason for the bolt failures arose from a history of thermally induced shell cracking at the lintel joint area of the furnace. This is a known feature of the lintel furnace design and has been observed on other such furnaces. Despite a number of attempted remedies over a period of years, the thermal cracking of the steel furnace shell at the lintel gave rise to gas leaks, which ignited and further induced thermal distortion into the lintel ring. It is believed that this had created considerable loadings within the lattice structure formed by the lintel and the supporting columns at the column heads. The resolution of these thermal forces may well have eventually manifested itself as broken retaining bolts. 13 It should be noted that the manufacturers of the furnace have no record of having suggested any maintenance and/or inspection regime for the bolts, and none was carried out by the company except at the various rebuilds during the furnace life. Where rebuild engineers had found broken bolts, they had replaced them, in some cases by bolts manufactured on site – hence the variation in the metallurgical composition of the bolts tested. The explosion of No.5 Blast Furnace, Corus UK Ltd, Port Talbot - 8 November 2001 50 of 61 pages
Health and Safety Executive Appendix 8 Timeline of events Table 1 No 5 Blast Furnace campaigns Years Blown in Blown down ’000 Tonnes New furnace 1959 1962 3.58 2 040 Reline 1963 1967 4.42 2 902 Reline 1968 1972 3.92 2 411 Rebuild 1974 1980 5.83 3 429 Reline 1981 1988 7.58 6 590 Reline 1989 2001 (failure) 12.58 14 696 Simple timeline of events prior to explosion 7/11/01 09.15 Electrical fault at power plant – water pumps to furnace fail 09.25 Pumps back on – all appears ‘ok’ 09.25 + Elevated hydrogen levels detected 10.00 Visual checks for water leaks, unable to locate source 11.30 Decision to take furnace off wind 13.00 Furnace charging ceases 14.30 Furnace off wind 14.30 Checks to locate water leaks – hydrogen remains high 17.00 Meeting – tuyères 3 and 4 black, water ingress indicated 18.30 Shift changeover 19.00 Leak located, Sorrelor coolers over 4, 5, 6 tuyères 19.10 Coolers grouted and by-passed. Backdrafting 20.00 Furnace ‘shut up’ – water systems shut 23.00 Decision made to bring furnace back on wind 23.30 Back on wind at low pressure – 0.35 bar. Furnace charging 8/11/01 00.30 Tap hole unplugged, producing gas and flames 01.30 Lancing begins 02.30 Contact with iron made, slow flow obtained 03.35 Small run of iron, interrupted by gas. Lancing continues 06.00 Use of bigger lances starts 06.30 Shift changeover 08.30 Iron run – furnace running on 60–70 000 m3 per hour 09.00 Management meeting – prepare for shutdown on 9 November 2001 10.30 Progress meeting – coke rate raised from 560 to 700 kg all day Lancing continues 12.51 Watermen checking tuyères – only eight tuyères open 13.00 Watermen checking tuyères – only eight open; hydrogen high 15.50 Stock rods stop moving 16.00 Review meeting – actions to be carried out decided 17.06 Major increase in hydrogen levels 17.13 Major explosion event The explosion of No.5 Blast Furnace, Corus UK Ltd, Port Talbot - 8 November 2001 51 of 61 pages
Health and Safety Executive Appendix 9 Predictive tools 1 It is likely that had established predictive methodologies been employed by the company (during the discussions of the Extension Committee, for example) the risk of adverse events at some point in the extended life of the furnace would have been substantially less. The methods that are relevant are those which seek to determine the likelihood and consequences of component and plant and machinery failures. The principal methods, all with variants and often used in combination, are as follows: ■ Fault Tree Analysis (FTA); ■ Failure Modes and Effects Analysis (FMEA); ■ Hazard and Operability Studies (HAZOPS); and ■ Layers of Protection Analysis (LoPA). Fault Tree Analysis (FTA) 2 This method is suitable for both risk assessment and accident analysis. It is a ‘top-down’ analysis, where a study is made of all the events that, when in a logical combination, lead to an undesired top event. Fault trees are built using ‘gates’ as well as events. An ‘AND’ gate is used where all the events at one level must occur for the event to happen at the next level up. An ‘OR’ gate is where any one of a number of events must occur for the upper event to occur. 3 FTA was first used in the aerospace industry in the early 1960s. By the mid 1990s it was widely used in transportation and manufacturing, as well as in major hazard industries. 4 There was available expertise within the company to employ this methodology – the method was extensively used in 2000 when Corus UK Ltd prepared its safety report for the COMAH Regulations 1999. It is to be noted that this analysis failed to predict the explosion of No. 5 furnace as it actually occurred. Failure Modes and Effects Analysis (FMEA) 5 This method involves the step-by-step study of plant/machinery components. For each component, four questions are asked: how can the part fail? what are the consequences of failure? how can the prospective failures be detected? and prevented? 6 The technique was developed in the 1950s by reliability engineers. It has been a standard method in many engineering industries, and widely taught to engineers for many years. Again, the methodology was known to Corus. The explosion of No.5 Blast Furnace, Corus UK Ltd, Port Talbot - 8 November 2001 52 of 61 pages
Health and Safety Executive Hazard and Operability Studies (HAZOPS) 7 Whereas the starting point for FMEA is a specific machine/plant component, HAZOPS’s point of departure is a design intention. The method is used to evaluate deviations from the design intent with guide words and property words, for example: ■ LESS (guide) WATER FLOW (property); ■ MORE (guide) CURRENT (property); ■ AS WELL AS (guide) COMPOSITION (property), eg pollutants/debris in water supply; then for each deviation, the causes and consequences, and necessary preventive action are determined. A team conducts the study, with all relevant people involved, and is usually chaired by a senior safety manager. 8 The method was developed in the late 1960s by ICI chemical engineers. Its use was promoted by the Flixborough explosion in 1974, and later by major hazards legislation such as the Control of Industrial Major Accident Hazards Regulations 1984 (CIMAH). For many years it has been a standard method in the chemical industry, and widely taught, inter-alia, to safety practitioners before 1990. The method was known to the company – HAZOPS was used in 1999/2000 to evaluate the No. 4 Blast Furnace cooling systems at Port Talbot. Layers of Protection Analysis (LoPA) 9 Layers of Protection Analysis is an analytical tool for assessing the adequacy of protection layers used to mitigate process risk. LoPA builds upon well-known process hazards analysis techniques, applying semi-quantitative measures to the evaluation of the frequency of potential incidents and the probability of failure of the protective layers. FTA, FMEA, HAZOPS and LoPA – possible effective uses 10 All the techniques embrace failures associated with both human errors and plant malfunctions. They are actually very simple to understand and use. Success in their use depends most on the expertise of the participants in the engineering technicalities, and also knowledge of human factors. They are resource consuming when used to evaluate complex machinery/plant. 11 Each of the methods would have had particular strengths in predicting the specific events and conditions that actually happened. For example: ■ FTA would have demonstrated the logical relationship between predicted adverse events and would have highlighted the interactions between plant failures and human errors. It would, for example, have drawn attention to the importance of effective communications; ■ FMEA would have been particularly useful in analysing the turbo pumps’ governors and trip devices, and assessing the reliability of auto-starts generally; ■ HAZOPS would have forced attention on the causes and consequences of partial system failures, particularly with the key property words of water and electricity. For example, the words, with regard to a transformer, MORE CURRENT, would reasonably have led to an understanding of the consequences of a failure to adjust off-circuit tap changers, and the need for low-voltage alarms; and ■ LoPA may have drawn together the lessons learned from use of the above techniques to give some insight into the likelihood of some adverse event occurring to the No. 5 furnace and its systems – especially with reference to the pattern of failures at the Energy Department. The explosion of No.5 Blast Furnace, Corus UK Ltd, Port Talbot - 8 November 2001 53 of 61 pages
Health and Safety Executive Appendix 10 Relevant legislation 1 There is no specific health and safety legislation regulating the operations at blast furnaces in the UK. 2 The principle safety legislation relating to the steel industry was, over the material time, the Health and Safety at Work etc Act 1974, the Management of Health and Safety at Work Regulations 1992, the Pressure Systems Safety Regulations 2000, and the Provision and Use of Work Equipment Regulations 1998. Health and Safety at Work etc Act 1974 3 The Health and Safety at Work etc Act 1974 imposes general duties on employers to employees and others, including members of the public, to ensure they are protected from the risks arising from the employer’s activities. 4 The Management of Health and Safety at Work Regulations 1992 (now 1999) make explicit the general duties on employers the Health and Safety at Work etc Act 1974. Employers are required, for instance, to carry out risk assessments (under regulation 3) and to make appropriate arrangements for the managing of health and safety (regulation 4). 5 HSE’s compliance regimes were underpinned by this generally-applicable legislation. Pressure Systems Safety Regulations 2000 6 The Pressure Systems Safety Regulations 2000 replaced the Pressure Systems and Transportable Gas Containers Regulations 1989. Both applied to blast furnaces. The Regulations place duties on designers, manufacturers, importers and suppliers in respect of design, construction and the provision of protective devices. They also place duties on users in respect of safe operating limits, periodic examination by competent persons, operating procedures, maintenance and modifications/repairs. British Steel/Corus were/are the only users of blast furnaces in the UK. HSE considered the inspection and maintenance regimes were mature and well established. Provision and Use of Work Equipment Regulations 1998 7 These regulations place specific duties upon employers in relation to the design, use and maintenance of equipment used at work to control the risks presented by such equipment. Clearly these regulations apply to blast furnaces. Control of Industrial Major Accident Hazards Regulations 1984 (CIMAH) 8 These Regulations were introduced in the mid-1980s. The Control of Industrial Major Accident Hazards Regulations 1984 were deemed by HSE’s Solicitor, at the time, not to apply to blast furnaces. 9 The CIMAH Regulations 1984 were introduced following the European Union’s ‘Seveso’ Directive. The HSE Solicitor in 1985 agreed with British Steel’s legal opinion that CIMAH did not apply to blast furnaces. A CIMAH ‘safety report’ The explosion of No.5 Blast Furnace, Corus UK Ltd, Port Talbot - 8 November 2001 54 of 61 pages
Health and Safety Executive prepared at that time under the Regulations – if they had applied – would have obliged British Steel to carry out systematic risk assessment and to submit its report to HSE. 10 The CIMAH Regulations were replaced by the Control of Major Accident Hazards Regulations in 1999 (COMAH). Blast furnaces were explicitly included in the revised regulations. Corus UK Ltd submitted their Safety Case to HSE in early 2002. Control of Major Accident Hazards Regulations 1999 (COMAH) 11 The COMAH Regulations apply to blast furnace operations by virtue of the presence of an ‘extremely flammable and toxic’ substance – blast furnace gas – exceeding 10 tonnes (lower-tier threshold). Regulations 7–14 of COMAH, which require safety reports and both on and off-site emergency planning, also apply where the presence of an extremely flammable substance exceeds 50 tonnes (top-tier threshold). No. 5 Blast Furnace exceeded this top-tier threshold. Blast furnace gas is also categorised as ‘toxic’. The COMAH threshold for toxic substances is 50 and 200 tonnes for lower-tier and top-tier thresholds respectively. Formal notification under COMAH was received by the Competent Authority in February 2000 from Corus that the Port Talbot site held an extremely flammable substance greater than the top-tier threshold. 12 The coming into force of, and application of COMAH to blast furnace operations involved HSE’s Hazardous Installations Directorate for the first time. The Regulations required the production of a safety report by Corus to demonstrate that they had taken all measures necessary to prevent major accidents and to limit the consequences to people and the environment of any that do occur. The safety report was required to be sent to the Competent Authority by 3 February 2002. The safety report would be expected to cover controls for the blast furnace gas, which will extend to most aspects of blast furnace operation including water cooling of the lining and safety management systems. 13 Regulation 19 of COMAH requires the Competent Authority to organise an adequate system of inspection of establishments. The programme is required to include at least one on-site inspection by the Competent Authority every 12 months. 14 Regulation 21 of COMAH requires the Competent Authority to notify the European Commission as soon as practicable of major incidents involving fatalities and other specified criteria. The explosion of No.5 Blast Furnace, Corus UK Ltd, Port Talbot - 8 November 2001 55 of 61 pages
Health and Safety Executive Appendix 11 Previous HSE involvement 1 There was no evidence from British Steel, or elsewhere, of incidents of the nature of 8 November 2001 arising from blast furnace operations prior to the accident. 2 Between 1986 and the late 1990s there were a number of fatal accidents at the Port Talbot works. For many years, all evidence indicated that the root problems to most accidents and dangerous occurrences centred on British Steel/Corus’s difficulties in controlling and managing contractors. It was on this issue that HSE focused its efforts. 3 In respect of the accident statistics observed at the steel plants involving contractors, a robust line on enforcement was taken on this issue, both with respect to the contractors and British Steel/Corus. 4 Operational inspectors were aware of the situation and inspectors’ reports showed that they were paying attention to it at their interventions. HSE operational inspectors, as part of their intervention programmes, actively contributed to British Steel/Corus rolling programmes of training supervisors and managers at the integrated works to raise their awareness of their duties. Although contractor’s employees were involved in the activities at the Port Talbot blast furnace at the time of the incident, the investigations have not found their presence to have been in any way a contributory factor. The explosion of No.5 Blast Furnace, Corus UK Ltd, Port Talbot - 8 November 2001 56 of 61 pages
Health and Safety Executive Glossary armouring (throat armour) metal segments let into the refractory brickwork at the throat of a blast furnace to protect it from damage as the charge is dropped into the furnace. blast (wind) the current of air supplied by a blower to a furnace through the bustle main and tuyères. blast furnace gas (top gas) the gas given off at the top of a blast furnace. Collected through a gas cleaning plant and used to heat the hot blast stoves and to fire boilers. It is a very low grade (ie low calorific value) gas. bleeder the pipe(s) at the top of the furnace through which gas can escape if the bleeders are open. bleeder valve the valve on top of a bleeder which is normally shut. blow down the process of taking a blast furnace out of commission (eg at the end of a campaign). blow pipe a pipe which conveys the blast from a blast furnace tuyère stock to the tuyère. bosh the part of a blast furnace which tapers outwards from the hearth. The hottest and most reactive area of the furnace requiring the most intensive cooling. burden the material inside the furnace which is reacted to produce iron. Comprises iron ore, flux and coke. bustle main the blast main, which encircles the lower part of the blast furnace and from which connections are made to the tuyères. campaign the period in which a blast furnace is in operation between major relines. carbon monoxide a colourless, odourless gas produced in iron making. It is highly poisonous even in low concentrations. cast to release the molten iron from a furnace by tapping it or opening the tap hole. cast house a building at the front of the blast furnace where the casting of iron is done. casting the process of tapping a blast furnace. charging the act of loading materials into a blast furnace. clay gun (mud gun) a hydraulic cylinder used to force refractory clay into the tap hole to form a plug between casts. cold blast blast air under pressure which has not yet been passed through the stoves to become ‘hot blast’. The explosion of No.5 Blast Furnace, Corus UK Ltd, Port Talbot - 8 November 2001 57 of 61 pages
Health and Safety Executive Davy cone a mechanical, conical ‘valve’ in the gas cleaning plant. Raised and lowered to alter gas flow of the exhaust gases and maintain furnace top pressure. dead man solid material in the bosh region which reaches down through the raceway from the burden down to molten material in the hearth. distributor (Paul Wurth top) a mechanical device at the top of a blast furnace to spread the charge evenly in the furnace stack. downcomer the pipe leading down from the offtake of a blast furnace to bring the gas down to ground level or to the gas cleaning plant. drilling the start of the tapping operation of a blast furnace. A remotely controlled drill is used to drill into the tap hole clay before an oxygen lance is used to hole through to the molten iron. dust catcher a closed chamber in the exhaust gas system of a furnace in which the velocity of the gases falls and the heavier dust settles out at the bottom from where it can be removed. furnace lining (refractory) refractory materials on the inside of the furnace to resist the action of heat and chemical erosion by the contents. There are many forms according to the particular conditions and they are renewable (by gunning or at reline). gas cleaning passing blast furnace gases through a variety of processes to clean them before use. grouting (of a cooler) injecting refractory grout into a damaged cooler to seal it and prevent water ingress into the furnace. gunning mechanical spraying of refractory material in the furnace stack to replace refractory brick lost during the campaign. hearth 1 The bottom of a blast furnace lining – made from carbon blocks. 2 The bed or working part of a blast furnace which holds the molten metal. hot blast cold blast after it has been heated by the stoves. Blown into the furnace under pressure through the bustle main and tuyères. injection (of coal, steam, waste oil) tubes inserted through the tuyères to introduce coal, waste oil or steam into the furnace to improve operation and efficiency. lancing using an oxygen lance to burn solidified iron (skulls) at the tap hole to allow the molten iron to flow out of the tap hole. lap joint the overlapping joint in the furnace stack to allow for expansion where the upper stack meets the bosh. lintel the fabricated steel ring which encircles the stack of a lintel furnace, supported by the columns and supporting the upper stack. The explosion of No.5 Blast Furnace, Corus UK Ltd, Port Talbot - 8 November 2001 58 of 61 pages
Health and Safety Executive oxygen lance a steel tube 3/4’ or 1’ diameter through which oxygen is fed and used to burn into the furnace. plate coolers copper plates containing waterways inserted into the furnace through the shell and refractory brickwork to provide cooling to the furnace. raceway the area in front of the tuyères which is occupied by hot blast blown into the furnace. refractory see ‘furnace lining’. scrubber a vertical closed vessel in a furnace exhaust gas system in which the waste gases ascend through sprays of water. Dust is washed out of the gas and collects as a sludge at the bottom of the scrubber. skip hoist a wheeled container hauled mechanically up rails to the top of the furnace where it automatically inverts to discharge burden into the furnace. skull the shell of cooled iron and slag which may build up on the lining of a blast furnace. slag the non-metallic impurities removed from iron ore in a blast furnace and drawn off in molten form. slag notch the aperture through which slag is tapped from the furnace. slag pool the area into which molten slag is directed after it has been skimmed off the molten iron. Once cooled it is broken up and removed by machines. slip (burden) sudden movement of the burden in the furnace after it has been bridged, ‘scaffolded’ or hung up. snort valve a valve in the cold blast main of a blast furnace designed to be opened to atmosphere so reducing blast without stopping the blast turbine. Sorrelor coolers cylindrical copper coolers containing waterways. Introduced into the furnace shell and refractory to provide additional cooling. stack that part of the blast furnace from the top of the bosh up to the throat armour. stave cooler large, heavy, hollow iron castings, incorporating steel water pipes built into the refractory to provide cooling. stoves large, vertical steel cylinders lined with refractory and heated by gas. The cold blast is heated in the stoves before it enters the hot blast main and is blown into the furnace through the bustle main and tuyères. tap to let iron and slag flow from the furnace by removing the clay plug from the tap hole which holds it in the furnace. tap hole the hole(s) at the front of the furnace through which molten iron is allowed to flow as required. The explosion of No.5 Blast Furnace, Corus UK Ltd, Port Talbot - 8 November 2001 59 of 61 pages
60 of 61 pages The explosion of No.5 Blast Furnace, Corus UK Ltd, Port Talbot - 8 November 2001 Health and Safety Executive tap hole drill a large remotely controlled mechanical drill used to drill the refractory clay plug out of the tap hole to allow iron to flow from the furnace. throat the narrowest part of a blast furnace at the top of the stack. torpedo rail-mounted steel vessels which are refractory lined to receive molten iron made in the blast furnace. Towed by locomotive from the blast furnace. troughs refractory-lined gullies in the cast house floor along which molten iron flows to the grids from where it pours into torpedoes located under the cast house. tuyère the end of the blast pipe conveying hot blast into the furnace. uptake a vertical pipe leading up from the top of the blast furnace to meet the downcomer and lead the furnace gases away. Four uptakes are common. wind (blast) the air supplied to a blast furnace (hot blast). This report is available at www.hse.gov.uk. © Crown copyright This publication may be freely reproduced, except for advertising, endorsement or commercial purposes. First published 09/08. Please acknowledge the source as HSE. Published by the Health and Safety Executive 09/08 Published by the Health and Safety Executive Ref no. WEB34 09/08 60 of 61 pages
FD06136 | 2003_港澳台_澳门_青洲区油气库爆炸大火_消防局原因说明.md
分类:06_境外及港澳台调查报告 | 年份:2003 | 地域:澳门 | 严重程度: | 场所: | 起火原因:燃气/爆炸 | 来源格式:md
澳門十年來最大火災:青洲區油氣庫爆炸大火消防局原因說明
ʮԭ ϵȼҺ
http://www.sina.com.cn 2003080216:13 »
»82յ磨 2ýܣ1ҹıըͻ֣϶ǶѷһյϵĹҵȼҺģըľԭһ顣2粢δӵ档
ݰֺж־ܣ110ʱ50ңֽӵ˶ʯ˾;ִĵطը
ֽӾ6Ӽϴֳʱչ˾ȹڵʱŪ巢ըľΪ£ϷֳԱ⣬һɲ˽롣2СʱŬ4000ƽĴֳ2賿2ʱõơ
ֳʱԱ֣¹ʷһ֪˽õأѷŹҵõȼҺƿǵ纸õķúյϻѷŽľģ϶ľʧҺƿıը
־ڽܼѯʱܣ¹ǰ10һλֱը¹ʡڻֳ;ִ80֣ľ10ףδըӦһҡˣλֵʧԺ䡣2磬¼һֱδӻ档
־ܣжУֹ28300Ա12СʱķսͼأһԱ29ʱ뿪
ֳһЩյñ͵ĴͰڵأԺͣżջٵĿʪĵϵҵĽ̿Ӱ繤ֺֻϤס¹ֳپҹѱתƵ繤ģҽԺľȻҲһֱֳͣ꣩Դ»
Ƽ Сӡر
2999 ֵղƷ 17LCD
Цӡƶᆱ ݵĿĸо
۾гһ ϻûȫ
¸Ӣ ʱŻ
ľ磬ܽӴҲɱˬϡá
ѯ
ؼһ
ؼʶ
ۺ վ ҳ ű ȫ Ӣǵ
Ϸ
Esprit
Сͨ
˾ʶ
ѧ
鹵ͨ˽ɷܵĹؼ̹ϡ
dzЦ
ɻʱһϣ֪ͨÿǿԵǻˡ
ͼƬ
[] Ͷͱ
[վӨ] ̫ί
[] ظԭ
ҵ
ൺ̻
ҵ䡪
湵ͨ
˽˹
:ȫƸУ
˷ȫ¸İ
ļ-ĵijŵ
ѣ˴Ϊң
ǻϾ̾Ϣ
Ϣ>>
ʯⱬը ԭ (2003/08/02 09:06)
֯ȫ˾ (2003/08/02 09:03)
ըѵõ δ (2003/08/02 08:05)
ۣ: :
ƪ
ͷأͼƬأÿ0.1Ԫֻֿţ
ЦޱȾޣĿ
Կѧӽȫ֪ʶĶŲƷ
ÿ228Ԫ/
ԭɫشͨͼƬ5Ԫء
Ųʵشͼ10Ԫء
ȤޱЦ ЦڳķdzЦ
ÿ230Ԫ/
绰010-82612286ӭָ
˼ |
About Sina |
|
ƸϢ |
վʦ |
SINA English | Ʒ
Copyright © 1996 - 2003 SINA Inc. All Rights Reserved
Ȩ
FD06137 | 2004_台湾_监察院火灾专案调查报告_093内调0169.pdf
分类:06_境外及港澳台调查报告 | 年份:2004 | 地域:台湾 | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
I
目 錄
壹 、 調
查
緣
起 ............................................................. 一
貳 、 調
查
對
象 ............................................................. 一
參 、 案
由 ............................................................. 一
肆 、 調
查
依
據 ............................................................. 一
伍 、 調
查
重
點 ............................................................. 一
陸 、 調
查
事
實 ............................................................. 二
一 、 中 央 及 地 方 火 災 調 查 鑑 定 組 織 、 人 力 、 待 遇 、 適 任 資 格 、 教 育 訓 練 、 裝 備 、 督 導 考 評 機 制 及 運 作 情 形 ........................................................ 三
( 一 ) 火 災 調 查 、 鑑 定 組 織 及 人 力 ............................................ 三
1 、 中 央 及 地 方 消 防 機 關 之 火 災 調 查 鑑 定 組 織 、 人 力 ........................ 三
2 、 各 直 轄 市 、 縣 、 市 政 府 火 災 調 查 鑑 定 委 員 會 之 設 立 依 據 、 組 成 及 運 作 情 形 ... 五
( 二 ) 適 任 資 格 及 待 遇 .................................................... 一 ○
( 三 ) 教 育 訓 練 情 形 ...................................................... 一 二
( 四 ) 裝 備 及 設 備 情 形 .................................................... 一 二
1 、 中 央 鑑 定 實 驗 室 部 分 .............................................. 一 三
2 、 地 方 消 防 機 關 部 分 ................................................ 一 四
II ( 五 ) 督 導 考 評 機 制 及 實 施 情 形 ............................................ 一 五
二 、 台 灣 地 區 火 災 調 查 相 關 業 務 統 計 數 據 及 火 災 案 件 原 因 不 明 、 重 新 鑑 定 情 形 ..... 一 七
( 一 ) 近 十 年 台 灣 地 區 火 災 次 數 、 死 傷 人 數 、 財 物 損 失 情 形 及 人 為 縱 火 比 例 ....... 一 七
( 二 ) 各 縣 市 火 災 業 務 相 關 指 標 數 據 排 序 情 形 ................................ 一 八
1 、 台 灣 地 區 各 市 縣 每 百 萬 人 火 災 死 亡 人 數 排 序 .......................... 一 八
2 、 台 灣 地 區 各 市 縣 每 千 戶 火 災 發 生 次 數 排 序 ............................ 一 九
3 、 台 灣 地 區 各 市 縣 每 十 萬 人 之 消 防 人 員 數 目 ( 消 防 人 力 ) 排 序 ............. 一 九
( 三 ) 各 縣 、 市 火 災 案 件 鑑 定 結 果 為 「 原 因 不 明 」 之 情 形 ...................... 一 九
1 、 依 據 各 直 轄 市 、 縣 市 消 防 局 查 復 統 計 資 料 , 近 十 年 火 災 案 件 鑑 定 結 果 為 「 原 因 不 明 」 之 比 例 情 形 .................................................. 二 ○
2 、 消 防 署 針 對 原 因 不 明 火 災 案 件 之 說 明 ................................ 二 二
3 、 各 直 轄 市 、 縣 、 市 消 防 局 針 對 原 因 不 明 火 災 案 件 之 處 理 情 形 ............. 二 二
( 四 ) 各 直 轄 市 、 縣 市 消 防 局 針 對 火 災 調 查 鑑 定 案 件 重 新 調 查 之 比 例 、 原 因 及 依 據 . 二 三
1 、 消 防 署 之 說 明 .................................................... 二 三
2 、 地 方 消 防 機 關 之 說 明 .............................................. 二 五
三 、 各 級 消 防 機 關 與 刑 事 警 察 機 關 、 檢 察 機 關 針 對 火 災 案 件 刑 事 偵 查 作 業 之 橫 向 聯 繫 機 制 及 標 準 作 業 程 序 ...................................................... 二 五
( 一 ) 消 防 署 之 說 明 ...................................................... 二 五
II
( 二 ) 警 政 署 之 說 明 ...................................................... 二 七
1 、 我 國 刑 案 、 火 災 調 查 鑑 定 制 度 與 日 本 之 異 同 .......................... 二 七
2 、 國 內 目 前 實 際 運 作 情 形 ............................................ 二 八
3 、 有 關 消 防 署 稱「刑事警察應配合消防人員於第一時間前往火災現場進行蒐證及勘 「 刑 事 警 察 應 配 合 消 防 人 員 於 第 一 時 間 前 往 火 災 現 場 進 行 蒐 證 及 勘 查 」 乙 節 ........................................................ 二 九
四 、 國 內 消 防 機 關 火 災 原 因 調 查 報 告 書 正 確 性 及 公 信 力 不 足 遭 外 界 質 疑 之 情 形 ..... 三 一
( 一 ) 媒 體 報 導 及 民 眾 質 疑 火 災 鑑 定 之 正 確 性 及 公 信 力 問 題 .................... 三 一
( 二 ) 司 法 機 關 因 地 方 消 防 機 關 火 災 原 因 調 查 報 告 書 撰 寫 疏 漏 、 草 率 , 委 請 消 防 署 重 新 調 查 、 鑑 定 部 分 ...................................................... 三 五
( 三 ) 本 案 相 關 調 查 案 件 調 查 所 得 發 現 之 缺 失 ................................ 三 七
五 、 民 眾 針 對 火 災 調 查 鑑 定 業 務 滿 意 度 之 調 查 統 計 情 形 ........................ 三 七
六 、 相 關 機 關 針 對 民 眾 申 請 參 閱 火 災 原 因 調 查 報 告 書 及 消 防 機 關 針 對 火 災 案 件 當 事 人 就 火 災 原 因 鑑 定 結 果 質 疑 或 不 滿 意 之 處 理 機 制 ................................ 三 八
( 一 ) 司 法 院 針 對 公 共 安 全 界 參 與 司 法 改 革 座 談 會 建 議 事 項 辦 理 情 形 ............. 三 八
( 二 ) 法 務 部 之 說 明 ...................................................... 四 ○
( 三 ) 消 防 機 關 之 說 明 .................................................... 四 一
1 、 消 防 署 之 說 明 .................................................... 四 一
2 、 台 北 市 消 防 局 之 說 明 .............................................. 四 二
IV 3 、 彰 化 縣 消 防 局 之 說 明 .............................................. 四 三
4 、 台 東 縣 消 防 局 之 說 明 .............................................. 四 三
5 、 其 他 地 方 消 防 機 關 之 綜 合 說 明 ...................................... 四 三
七 、 國 內 現 行 火 災 原 因 調 查 、 鑑 定 制 度 之 檢 討 及 興 革 情 形 ...................... 四 三
( 一 ) 消 防 署 之 說 明 ...................................................... 四 三
( 二 ) 中 央 警 察 大 學 之 說 明 ................................................ 四 四
( 三 ) 地 方 消 防 機 關 之 綜 合 檢 討 說 明 ........................................ 四 五
八 、 專 家 學 者 及 相 關 研 究 文 獻 於 火 災 調 查 鑑 定 領 域 之 研 究 成 果 及 論 述 意 見 ......... 四 六
柒 、 調
查
意
見 ........................................................... 五 二
一 、 火 災 調 查 鑑 定 組 織 未 臻 健 全 、 設 備 闕 舊 、 閒 置 , 品 質 難 以 提 升 ............... 五 三
( 一 ) 火 災 調 查 鑑 定 人 力 不 足 、 養 成 訓 練 欠 紮 實 、 素 質 偏 低 及 設 備 、 器 材 闕 漏 、 閒 置 五 三
1 、 內 政 部 疏 於 注 意 , 怠 未 對 早 已 存 在 有 年 之 消 防 署 缺 乏 訓 練 場 地 、 中 央 火 災 鑑 定 實 驗 室 人 力 、 腹 地 、 效 率 不 足 及 台 灣 警 察 專 科 學 校 相 關 養 成 訓 練 欠 紮 實 之 缺 失 及 窘 境 , 設 法 研 議 改 善 , 致 火 災 調 查 鑑 定 人 員 之 素 質 、 鑑 定 品 質 及 時 效 難 以 提 昇 , 殊 有 未 當 .......................................................... 五 三
2 、 內 政 部 未 對 部 分 地 方 消 防 局 未 設 置 火 災 調 查 鑑 定 專 責 單 位 、 人 力 不 足 及 設 備 闕 舊 等 問 題 , 促 請 各 直 轄 市 、 縣 市 政 府 研 謀 解 決 , 核 有 失 當 ................. 五 六
3 、 消 防 署 怠 於 監 督 , 致 有 十 三 個 縣 市 消 防 局 未 善 加 利 用 促 燃 劑 殘 跡 證 物 之 鑑 定 儀 器
V
而 予 閒 置 荒 廢 情 事 , 確 有 未 當 ...................................... 五 八
( 二 ) 火 災 鑑 定 委 員 會 功 能 明 顯 不 彰 , 部 分 成 員 引 發 爭 議 ...................... 五 九
1 、 消 防 署 未 善 盡 監 督 之 責 , 致 各 直 轄 市 、 縣 市 火 災 案 件 數 由 火 災 鑑 定 委 員 會 鑑 定 之 比 率 平均未及○‧一%,功能明顯不彰,且部分縣市未依規定每年開會,委員會 均 未 及 ○ ‧ 一 % , 功 能 明 顯 不 彰 , 且 部 分 縣 市 未 依 規 定 每 年 開 會 , 委 員 會 形 同 虛 設 ........................................................ 五 九
2 、 彰 化 縣 政 府 延 聘 刻 於 法 院 審 理 中 火 災 案 件 之 當 事 人 為 火 災 鑑 定 委 員 會 委 員 , 招 致 爭 議 , 自 有 未 當 .................................................. 六 ○
二 、 火 災 調 查 鑑 定 制 度 及 運 作 機 制 缺 漏 不 全 , 弊 病 叢 生 ........................ 六 ○
( 一 ) 內 政 部 未 善 盡 監 督 職 責 , 致 警 政 署 刑 事 警 察 局 暨 各 刑 事 警 察 機 關 , 怠 未 依 規 定 切 實 配 合 消 防 機 關 於 第 一 時 間 抵 達 火 災 現 場 勘 驗 , 延 誤 火 災 案 件 刑 事 偵 辦 時 效 , 無 異 為 縱 火 案 件 逐 年 攀 升 之 主 因 , 顯 有 重 大 違 失 .............................. 六 一
( 二 ) 內 政 部 疏 未 對 各 消 防 機 關 、 警 察 機 關 就 火 災 現 場 尚 未 完 成 調 查 鑑 定 之 封 鎖 及 撤 銷 封 鎖 作 業 , 律 定 作 業 規 範 及 標 準 程 序 , 肇 致 基 層 警 、 消 人 員 現 場 執 行 迭 生 爭 議 及 困 擾 , 確 有 未 當 .......................................................... 六 六
( 三 ) 消 防 署 未 落 實 依 法 行 政 , 怠 未 准 予 相 關 當 事 人 依 行 政 程 序 法 規 定 , 申 請 查 閱 火 災 原 因 調 查 報 告 書 , 有 違 行 政 資 訊 公 開 原 則 ; 對 於 民 眾 就 火 災 原 因 調 查 結 果 之 質 疑 、 不 服 及 不 滿 , 復 未 建 立 標 準 處 理 機 制 , 招 致 民 怨 , 損 及 政 府 形 象 , 顯 有 欠 當 ... 六 七
( 四 ) 高 雄 縣 、 屏 東 縣 等 消 防 局 疏 未 落 實 消 防 法 施 行 細 則 第 二 十 五 條 規 定 , 擅 將 未 成 災 火
VI 災 案 件 之 火 災 原 因 調 查 報 告 書 逕 行 存 檔 備 查 , 核 有 違 失 ................... 七 二
( 五 ) 消 防 署 怠 未 建 立 標 準 作 業 規 範 及 程 序 , 致 八 十 七 年 十 月 十 九 日 桃 園 縣 龜 山 工 業 區 內 來 緯 實 業 股 份 有 限 公 司 及 四 維 企 業 股 份 有 限 公 司 火 災 原 因 之 重 新 調 查 鑑 定 作 業 屢 生 諸 多 缺 漏 及 疏 失 , 致 遭 外 力 介 入 之 質 疑 ; 對 於 前 後 鑑 定 結 果 殊 異 之 原 因 , 迄 未 究 明 釐 清 , 招 致 陳 情 、 質 疑 、 詬 病 不 斷 , 洵 有 重 大 違 失 ...................... 七 三
三 、 火 災 原 因 調 查 結 果 正 確 性 堪 慮 , 公 信 力 不 足 , 屢 遭 詬 病 ..................... 七 七
( 一 ) 消 防 署 怠 於 監 督 , 致 地 方 消 防 機 關 怠 未 落 實 火 災 原 因 調 查 實 施 要 點 之 規 定 , 究 明 火 災 原 因 , 洵 有 未 當 .................................................. 七 七
( 二 ) 消 防 署 監 督 不 力 , 致 地 方 消 防 機 關 疏 未 落 實 相 關 規 定 , 肇 致 火 災 原 因 調 查 報 告 書 之 撰 寫 , 失 之 草 率 , 核 有 未 當 .......................................... 七 九
1 、 司 法 機 關 因 地 方 消 防 機 關 火 災 原 因 調 查 報 告 書 撰 寫 疏 漏 、 草 率 , 委 請 消 防 署 重 新 調 查 、 鑑 定 部 分 .................................................. 七 九
2 、 本 院 相 關 案 件 調 查 發 現 之 缺 失 部 分 .................................. 八 一
四 、 消 防 署 針 對 火 災 調 查 業 務 相 關 統 計 數 據 未 臻 確 實 , 對 於 其 警 訊 亦 乏 警 覺 : ..... 八 一
( 一 ) 消 防 署 與 地 方 消 防 機 關 針 對 火 災 發 生 次 數 、 原 因 不 明 件 數 及 重 新 鑑 定 次 數 之 統 計 數 據 未 盡 相 符 、 精 確 , 洵 有 疏 漏 , 招 致 相 關 管 制 作 為 數 據 之 精 確 性 與 公 信 力 令 人 質 疑 , 顯 有 疏 失 .......................................................... 八 二
( 二 ) 消 防 署 針 對 火 災 業 務 相 關 統 計 數 據 之 警 訊 , 缺 乏 警 覺 及 因 應 措 施 , 防 火 管 理 作 為 不
VI
足 , 顯 有 疏 失 ...................................................... 八 三
五 、 內 政 部 允 宜 督 促 消 防 署 就 火 災 調 查 鑑 定 相 關 專 家 學 者 、 研 究 文 獻 所 提 建 議 及 興 革 意 見 , 妥 為 研 議 檢 討 , 以 完 備 火 災 調 查 鑑 定 制 度 , 精 進 提 升 火 災 調 查 鑑 定 品 質 ... 八 五
捌 、 處
理
辦
法 ........................................................... 九 一
附 件 一 、 火 災 調 查 鑑 定 相 關 文 獻 之 研 究 論 述 及 成 果 .............................. 九 二
一
調 查 報 告
壹 、 調 查 緣 貣 : 本 案 係 委 員 自 動 調 查 。
貳 、 調 查 對 象 : 內 政 部 ( 消 防 署 、 警 政 署 ) 、 中 央 警 察 大 學 、 台 灣 警 察 專 科 學 校 、 各 直 轄 市 、 縣 市 政 府 。
參 、 案
由 : 火 災 調 查 係 查 明 火 災 發 生 原 因 之 重 要 途 徑 , 亦 是 瞭 解 地 區 火 災 問 題 特 性 與 研 擬 消 防 對 策 之 必 要 步 驟 , 藉 由 調 查 所 完 成 之 鑑 定 報 告 不 僅 提 供 司 法 機 關 作 為 判 斷 貣 火 之 原 因 , 並 為 釐 清 民 、 刑 事 及 相 關 行 政 責 任 之 重 要 參 據 。 惟 近 年 來 火 災 事 故 頻 仍 , 消 防 機 關 之 鑑 定 報 告 屢 遭 質 疑 , 與 勞 工 安 全 檢 查 機 構 之 鑑 定 結 果 又 常 欠 一 致 , 為 建 立 民 眾 對 鑑 定 結 果 之 公 信 力 , 加 強 保 障 民 眾 生 命 及 財 產 之 安 全 , 對 於 現 行 火 災 調 查 制 度 、 組 織 及 人 力 、 專 業 技 術 與 裝 備 、 運 作 與 功 能 等 相 關 事 項 , 認 有 深 入 瞭 解 之 必 要 乙 案 。
肆 、 調 查 依 據 : 本 院 民 國 ( 下 同 ) 九 十 三 年 五 月 二 十 八 日 ( 九 三 ) 院 台 調 壹 字 第 ○ 九 三 ○ 八 ○ ○ 三 七 五 號 函 。
伍 、 調 查 重 點 :
一 、 中 央 及 地 方 火 災 調 查 鑑 定 組 織 、 人 力 、 適 任 資 格 、 待 遇 、 教 育 訓 練 、 裝 備 、 督 導 考 評 機 制 及 運 作 情 形 。
二 、 台 灣 地 區 火 災 調 查 相 關 業 務 數 據 統 計 及 火 災 案 件 原 因 不 明 、 重 新 鑑 定 情 形 。
二
三 、 各 級 消 防 機 關 與 刑 事 警 察 機 關 、 檢 察 機 關 針 對 火 災 案 件 刑 事 偵 查 作 業 之 橫 向 聯 繫 機 制 及 標 準 作 業 程 序 。
四 、 國 內 消 防 機 關 火 災 原 因 調 查 報 告 書 正 確 性 及 公 信 力 不 足 遭 外 界 質 疑 之 情 形 。
五 、 民 眾 針 對 火 災 調 查 鑑 定 業 務 滿 意 度 之 調 查 統 計 情 形 及 消 防 機 關 針 對 當 事 人 就 火 災 原 因 鑑 定 結 果 質 疑 或 不 滿 意 之 處 理 機 制 。
六 、 國 內 現 行 火 災 原 因 調 查 、 鑑 定 制 度 之 檢 討 、 展 望 及 興 革 情 形 。
七 、 專 家 學 者 及 相 關 研 究 文 獻 於 火 災 調 查 鑑 定 領 域 之 研 究 成 果 及 論 述 意 見 。
陸 、 調 查 事 實 :
案 經 本 院 分 別 以 民 國 ( 下 同 ) 九 十 三 年 六 月 二 十 八 日 ( 九 三 ) 處 台 調 參 字 第 ○ 九 三 ○ 八 ○ 四 ○ 九 三 號 、 同 字 第 ○ 九 三 ○ 八 ○ 四 ○ 九 四 號 、 同 字 第 ○ 九 三 ○ 八 ○ 四 ○ 九 五 號 及 同 年 月 二 十 九 日 同 字 第 ○ 九 三 ○ 八 ○ 四 一 ○ 一 號 函 請 各 直 轄 市 、 縣 市 消 防 局 、 法 務 部 、 行 政 院 研 究 發 展 考 核 委 員 會 、 司 法 院 就 相 關 問 題 詳 實 說 明 見 復 , 嗣 經 上 開 機 關 分 別 於 同 年 七 月 八 日 至 九 月 十 六 日 查 復 到 院 。 本 院 嗣 於 同 年 七 月 十 六 日 約 詢 內 政 部 簡 太 郎 次 長 、 內 政 部 消 防 署 ( 下 禒 消 防 署 ) 黃 季 敏 署 長 、 陳 武 雄 副 署 長 、 蕭 肇 寶 組 長 、 林 金 宏 專 門 委 員 、 周 鴻 呈 專 員 、 中 央 警 察 大 學 消 防 學 系 林 元 祥 主 任 、 內 政 部 警 政 署 ( 下 禒 警 政 署 ) 刑 事 警 察 局 高 政 昇 主 任 秘 書 、 蔡 東 成 研 究 員 、 劉 義 孝 組 長 、 台 灣 警 察 專 科 學 校 黃 書 郎 主 任 秘 書 、 消 防 安 全 科 潘 日 南 主 任 等 相 關 機 關 主 管 人 員 ; 本 院 並 自 同 年 七 月 至 十 月 間 持 續 研 閱 火 災 調 查 鑑 定 相 關 學 術 著 作 、 政 府 出 版 品 、 參 考 文 獻 及 涉 有 疑 義 之 火 災 案 件 、 內 政
三
部 、 行 政 院 主 計 處 及 各 縣 市 消 防 局 網 頁 統 計 資 訊 及 相 關 資 料 。 茲 分 述 調 查 事 實 如 下 :
一 、 中 央 及 地 方 火 災 調 查 鑑 定 組 織 、 人 力 、 待 遇 、 適 任 資 格 、 教 育 訓 練 、 裝 備 、 督 導 考 評 機 制 及 運 作 情 形 :
( 一 ) 火 災 調 查 、 鑑 定 組 織 及 人 力 :
1 、 中 央 及 地 方 消 防 機 關 之 火 災 調 查 鑑 定 組 織 、 人 力 :
消 防 署 表 示 , 該 署 設 有 火 災 調 查 組 , 下 設 調 查 科 及 鑑 定 科 ; 地 方 計 二 十 一 個 消 防 局 設 有 火 災 調 查 科 ( 課 ) , 而 以 任 務 編 組 或 職 務 兼 辦 之 型 態 辦 理 火 災 調 查 工 作 者 , 計 有 雲 林 縣 、 花 蓮 縣 、 金 門 縣 及 連 江 縣 等 四 個 消 防 局 。 自 警 政 、 消 防 機 關 分 隸 後 , 消 防 機 關 之 人 事 、 組 織 架 構 均 屬 地 方 自 治 事 項 , 茲 據 各 直 轄 市 、 縣 市 消 防 局 查 復 資 料 , 將 地 方 火 災 調 查 鑑 定 人 力 , 列 表 如 下 :
表 一 、 各 縣 、 市 消 防 局 火 災 原 因 調 查 鑑 識 人 力 一 覽 表
消 防 局
人 力
台 北 市
二 十 五 人 ( 火 災 調 查 科 下 設 調 查 、 鑑 識 兩 股 , 目 前 有 科 長 一 人 , 股 長 二 人 , 科 員 三 人 , 技 士 一 人 , 技 佐 一 人 , 小 隊 長 五 人 , 各 大 隊 計 配 置 隊 員 十 二 名 )
基 隆 市
五 人 ( 課 長 、 技 士 各 一 人 、 隊 員 三 人 )
台 北 縣
十 人 ( 課 長 一 人 、 承 辦 人 九 人 )
桃 園 縣
四 人 ( 課 長 、 課 員 、 小 隊 長 、 技 士 各 一 人 )
四
消 防 局
人 力
台 東 縣
三 人 ( 課 長 、 課 員 及 隊 員 各 一 人 )
宜 蘭 縣
三 人 ( 課 長 、 課 員 及 隊 員 各 一 人 )
新 竹 縣
五 人 ( 課 長 、 大 隊 長 、 主 任 、 課 員 、 隊 員 各 一 人 )
新 竹 市
三 人 ( 課 長 、 課 員 、 技 佐 各 一 人 )
苗 栗 縣
四 人 ( 課 長 、 課 員 各 一 人 及 隊 員 二 人 )
台 中 縣
六 人 ( 課 長 一 人 、 技 佐 一 人 、 隊 員 三 人 、 書 記 一 人 )
台 中 市
三 人 ( 課 長 一 人 、 技 士 、 技 佐 各 一 人 )
南 投 縣
六 人 ( 課 長 一 人 、 課 員 、 技 佐 各 一 人 、 隊 員 三 人 )
雲 林 縣
六 人 ( 除 局 本 部 二 人 【 課 長 、 課 員 , 由 教 育 訓 練 課 兼 辦 】 , 各 大 隊 遴 選 二 人 , 計 四 人 以 任 務 編 組 方 式 協 辦 ) 。
嘉 義 縣
六 人 ( 課 長 、 課 員 、 技 佐 各 一 人 及 隊 員 三 人 )
嘉 義 市
三 人 ( 課 長 、 技 士 、 技 佐 各 一 人 )
台 南 市
三 人 ( 課 長 、 課 員 及 隊 員 各 一 人 )
台 南 縣
四 人 ( 課 長 一 人 、 課 員 二 人 、 隊 員 一 人 )
高 雄 縣
九 人 ( 課 長 一 人 、 課 員 二 人 、 隊 員 六 人 )
五
消 防 局
人 力
高 雄 市
十 二 人 ( 科 長 、 技 正 、 股 長 各 一 人 、 組 長 、 組 員 、 科 員 各 二 人 、 技 士 三 人 )
花 蓮 縣
二 人 ( 課 長 及 隊 員 各 一 人 , 由 災 害 預 防 課 兼 辦 火 災 調 查 、 鑑 定 業 務 )
屏 東 縣
六 人 ( 課 長 一 人 、 課 員 二 人 、 技 士 二 人 、 技 佐 一 人 )
金 門 縣
三 人 ( 課 長 、 課 員 及 隊 員 各 一 人 )
澎 湖 縣
四 人 ( 課 長 、 小 隊 長 各 一 人 、 隊 員 二 人 )
連 江 縣
二 人 ( 由 其 它 課 室 兼 辦 )
2 、 各 直 轄 市 、 縣 、 市 政 府 火 災 調 查 鑑 定 委 員 會 之 設 立 依 據 、 組 成 及 運 作 情 形 :
( 1 ) 設 立 法 令 依 據 :
< 1
消 防 法 第 二 十 七 條 :
直 轄 市 、 縣 ( 市 ) 政 府 , 得 聘 請 有 關 單 位 代 表 及 學 者 專 家 , 設 火 災 鑑 定 委 員 會 , 調 查 、 鑑 定 火 災 原 因 ; 其 組 織 由 直 轄 市 、 縣 ( 市 ) 政 府 定 之 。
< 2
直 轄 市 縣 市 政 府 火 災 鑑 定 委 員 會 設 置 基 準 及 指 導 要 點 :
․ 第 二 點 :
火 災 鑑 定 委 員 會 之 任 務 如 下 : 一 、 關 於 轄 區 之 火 災 鑑 定 案 件 。 二 、 關 於 其 他 消 防 機 關 移 請 鑑 定 之 重 大 火 災 案 件 。 三 、 關 於 司 法 機 關 囑 託 鑑 定 之 火 災 案 件 。 四 、 關 於 火 災 鑑 定 之 新 技 術 、 新 設 備 之 蒐 集 、 研 究 、 適 用 及 改
六
進 事 項 。
․ 第 三 點 :
鑑 定 委 員 會 置 委 員 九 人 至 十 七 人 , 其 中 一 人 為 主 任 委 員 , 由 消 防 機 關 首 長 兼 任 , 其 餘 委 員 得 聘 請 火 災 預 防 、 災 害 搶 救 、 火 災 調 查 、 建 築 管 理 、 刑 事 警 察 等 業 務 單 位 主 管 為 機 關 代 表 及 具 消 防 、 刑 事 、 鑑 識 、 電 力 、 建 築 、 物 理 、 化 學 、 機 械 、 工 業 安 全 、 土 木 或 結 構 等 專 長 之 專 家 學 者 擔 任 ; 其 中 專 家 學 者 不 得 少 於 委 員 人 數 之 三 分 之 一 。 委 員 聘 期 均 為 二 年 , 期 滿 得 續 聘 。 但 代 表 機 關 出 任 者 , 應 隨 其 本 職 進 退 。 為 調 查 鑑 定 火 災 案 件 之 需 要 , 必 要 時 得 專 案 聘 請 專 家 學 者 擔 任 委 員 。
( 2 ) 各 直 轄 市 、 縣 、 市 政 府 火 災 調 查 鑑 定 委 員 會 之 委 員 組 成 及 運 作 情 形 :
消 防 署 表 示 , 由 於 火 災 現 場 受 高 溫 之 激 烈 燃 燒 , 自 受 燒 之 跡 證 調 查 與 鑑 定 原 因 , 本 有 其 技 術 上 之 困 難 , 且 具 有 火 災 現 場 勘 查 技 術 之 火 災 鑑 定 委 員 甚 少 , 目 前 僅 中 央 警 察 大 學 消 防 學 系 少 數 學 者 教 授 具 有 現 場 火 流 勘 查 之 專 業 知 識 , 而 其 他 之 委 員 則 係 由 電 力 、 建 築 、 物 理 、 化 學 、 機 械 、 工 業 安 全 、 土 木 、 結 構 … 等 專 長 之 專 家 學 者 擔 任 , 依 其 專 業 提 供 相 關 之 專 業 知 識 。 茲 將 各 直 轄 市 、 縣 、 市 政 府 火 災 調 查 鑑 定 委 員 會 之 委 員 組 成 及 運 作 情 形 , 列 表 如 下 :
表 二 、 各 直 轄 市 、 縣 市 政 府 火 災 調 查 鑑 定 委 員 會 之 委 員 組 成 及 運 作 情 形 一 覽 表
七
地 方 政 府
委 員 組 成
轄 內 火 災 案 件 由 火 災 鑑 定
委 員 會 完 成 鑑 定 之 比 例
台 北 市
十 六 位 委 員 , 其 中 機 關 代 表 七 人 ( 含 台 北 縣 消 防 局 長 、 新 竹 市 消 防 局 局 長 ) , 專 家 學 者 九 人 ( 含 中 央 警 察 大 學 【 下 禒 警 大 】 施 多 喜 教 授 、 陳 金 蓮 教 授 、 陳 火 炎 教 授 ) ( 依 據 消 防 署 直 轄 市 縣 市 政 府 火 災 鑑 定 委 員 會 設 置 基 準 及 指 導 要 點 , 主 任 委 員 , 由 消 防 機 關 首 長 兼 任 , 並 置 秘 書 一 人 , 幹 事 一 人 至 五 人 , 由 直 轄 市 、 縣 ( 市 ) 政 府 指 派 所 屬 消 防 機 關 人 員 【 表 一 所 列 人 員 】 兼 任 , 辦 理 幕 僚 作 業 )
8/8,263=0.1% 。
基 隆 市
十 位 委 員 , 其 中 機 關 代 表 二 人 , 專 家 學 者 八 人 ( 含 警 大 施 多 喜 教 授 、 陳 金 蓮 教 授 、 陳 火 炎 教 授 ) 。
無
台 北 縣
十 五 位 委 員 , 其 中 機 關 代 表 四 人 , 專 家 學 者 十 一 人 ( 含 警 大 施 多 喜 教 授 、 陳 金 蓮 教 授 、 陳 火 炎 教 授 ) 。
5/5,463=0.091% 桃 園 縣
十 一 位 委 員 , 其 中 機 關 代 表 三 人 ( 含 台 北 市 政 府 消 防 局 局 長 及 新 竹 市 消 防 局 局 長 ) , 專 家 學 者 八 人 ( 含 警 大 施 多 喜 教 授 、 陳 金 蓮 教 授 、 陳 火 炎 教 授 ) 。
5/14964=0.033% 宜 蘭 縣
九 位 委 員 , 其 中 府 內 委 員 四 人 , 專 家 學 者 五 人 。
無 ( 未 曾 開 會 )
新 竹 市
十 一 位 委 員 , 其 中 機 關 代 表 三 人 , 專 家 學 者 八 人 ( 含 警 5/1,192=0.42%
八
地 方 政 府
委 員 組 成
轄 內 火 災 案 件 由 火 災 鑑 定
委 員 會 完 成 鑑 定 之 比 例
大 陳 火 炎 教 授 、 施 多 喜 教 授 ) 。
新 竹 縣
十 三 位 委 員 , 其 中 府 內 委 員 四 人 , 專 家 學 者 九 人 。
4/6,313=0.063% 苗 栗 縣
八 位 委 員 , 其 中 府 內 委 員 三 人 , 專 家 學 者 五 人 。
3/2,727=0.1% 台 中 縣
十 二 位 委 員 , 其 中 機 關 代 表 六 人 , 專 家 學 者 六 人 。
9/6,182=0.146% 台 中 市
十 一 位 委 員 , 其 中 機 關 代 表 三 人 , 專 家 學 者 八 人 。
35/2,847=1.23% 彰 化 縣
十 二 位 委 員 , 其 中 機 關 代 表 二 人 , 專 家 學 者 十 人 。 ( 依 據 台 灣 彰 化 地 方 法 院 檢 察 署 九 十 一 年 八 月 一 日 院 彰 檢 朝 法 九 一 偵 二 一 ○ ○ 字 第 二 七 七 二 號 函 及 消 防 署 同 年 九 月 十 一 日 消 署 調 字 第 九 一 ○ ○ 一 二 ○ 八 四 號 函 之 說 明 略 以 : 「 查 九 十 年 八 月 三 十 一 日 一 時 七 分 彰 化 縣 埤 頭 鄉 合 興 村 彰 水 路 四 七 一 巷 ○ ○ 號 火 災 案 件 , 刻 於 彰 化 地 方 法 院 審 理 中 , 被 告 翁 ○ ○ 先 生 , 縣 府 卻 延 聘 渠 擔 任 火 災 鑑 定 委 員 會 委 員 … … 為 避 免 影 響 火 災 調 查 鑑 定 之 客 觀 性 及 公 正 性 , 請 消 防 局 審 慎 遴 選 。 」 )
1/6,233=0.016% 南 投 縣
十 一 位 委 員 , 其 中 機 關 代 表 六 人 , 專 家 學 者 五 人 。
3/7,189=0.042% 雲 林 縣
十 三 位 委 員 , 其 中 機 關 代 表 七 人 , 專 家 學 者 六 人 。
無
嘉 義 縣
十 四 位 委 員 , 其 中 機 關 代 表 六 人 , 專 家 學 者 八 人 ( 含 警 4/8,558=0.047%
九
地 方 政 府
委 員 組 成
轄 內 火 災 案 件 由 火 災 鑑 定
委 員 會 完 成 鑑 定 之 比 例
大 陳 火 炎 教 授 )
嘉 義 市
十 三 位 委 員 , 其 中 機 關 代 表 四 人 , 專 家 學 者 九 人 ( 含 警 大 陳 火 炎 教 授 )
2/5,101 = 0.04% 台 南 市
九 位 委 員 , 其 中 機 關 代 表 五 人 , 專 家 學 者 四 人 。
3/6,794=0.044% 台 南 縣
九 位 委 員 , 其 中 府 內 委 員 三 人 , 專 家 學 者 六 人 。
1/5,820=0.017% 高 雄 縣
十 位 委 員 , 其 中 府 內 委 員 三 人 , 專 家 學 者 六 人 ( 含 警 大 陳 金 蓮 教 授 及 陳 火 炎 教 授 ) 。
2/5,411=5.56% 高 雄 市
八 位 委 員 , 其 中 機 關 代 表 四 人 , 專 家 學 者 五 人 ( 含 警 大 施 多 喜 教 授 )
5/4089=0.12% 屏 東 縣
九 位 委 員 , 其 中 機 關 代 表 四 人 , 專 家 學 者 五 人 。
無
花 蓮 縣
九 位 委 員 , 其 中 機 關 代 表 四 人 , 專 家 學 者 五 人 。
無
台 東 縣
無
無
金 門 縣
十 位 委 員 , 其 中 府 內 二 位 、 專 家 學 者 八 位 ( 含 中 央 警 察 大 學 陳 火 炎 教 授 、 陳 金 蓮 教 授 、 黃 敬 德 副 教 授 等 三 位 )
無
澎 湖 縣
十 一 位 委 員 , 其 中 機 關 代 表 二 位 、 專 家 學 者 九 位
無
一 ○ 地 方 政 府
委 員 組 成
轄 內 火 災 案 件 由 火 災 鑑 定
委 員 會 完 成 鑑 定 之 比 例
連 江 縣
五 位 委 員 , 其 中 機 關 代 表 四 位 、 專 家 學 者 一 位
無
( 二 ) 適 任 資 格 及 待 遇 :
火 災 調 查 人 員 之 派 任 應 依 據 行 政 院 人 事 行 政 局 發 布 之 「 刑 事 鑑 識 、 爆 炸 物 處 理 暨 火 災 原 因 調 查 鑑 識 鑑 定 人 員 危 險 職 務 加 給 表 」 所 列 警 察 特 考 消 防 、 刑 事 鑑 識 或 刑 事 警 察 人 員 考 詴 及 格 , 並 經 中 央 警 察 大 學 或 警 察 專 科 學 校 畢 ( 結 ) 業 之 人 員 , 或 職 務 歸 列 為 消 防 技 術 、 刑 事 鑑 識 、 化 學 工 程 、 機 械 工 程 或 電 力 工 程 職 系 等 技 術 人 員 , 內 政 部 並 於 八 十 八 年 五 月 十 一 日 以 台 ( 八 八 ) 內 消 字 第 八 八 ○ 一 三 六 六 號 函 要 求 各 消 防 機 關 , 以 曾 受 消 防 署 火 災 原 因 調 查 相 關 訓 練 之 人 員 為 優 先 考 量 。 據 消 防 署 查 復 禒 , 目 前 全 國 火 災 調 查 人 員 計 一 五 六 人 , 均 符 合 上 揭 所 列 考 詴 類 料 或 職 系 之 資 格 條 件 , 其 待 遇 與 同 職 等 之 警 察 機 關 暨 海 巡 機 關 刑 事 鑑 識 人 員 、 警 察 機 關 爆 炸 物 處 理 人 員 相 同 , 茲 列 表 ( 單 位 , 新 台 幣 【 元 】 ; 下 同 ) 如 下 :
表 三 、 各 級 消 防 機 關 火 災 調 查 人 員 待 遇 一 覽 表
職 等
警 消 人 員
月 支 薪 俸
專 業 加 給
危 險 職 務 加 給
主 管 加 給
備 註
簡 任 11 警 監 三 階 (575 元 ) 41,815 30,760 34,740 16,170 消 防 署 火 災 調 查 組 組 長
簡 任 10 警 監 四 階 39,305 28,230 32,785 11,060 消 防 署 火 災 調 查 組 專 門 委 員
一 一
職 等
警 消 人 員
月 支 薪 俸
專 業 加 給
危 險 職 務 加 給
主 管 加 給
備 註
(525 元 ) 薦 任 9 警 正 一 階 (450 元 ) 34,290 24,280 28,120 8,190 科 長 ( 消 防 署 及 直 轄 市 政 府 消 防 局 ) 薦 任 8 警 正 二 階 (390 元 ) 31,470 23,280 27,585 6,340 課 長 ( 其 他 地 方 政 府 消 防 局 ) 薦 任 7 警 正 三 階 (330 元 ) 28,645 20,450 27,060 4,840 各 級 消 防 機 關 其 他 主 管 人 員
薦 任 6 警 正 四 階 (275 元 ) 25,825 19,590 26,525 3,970 委 任 5 警 佐 一 階 (230 元 ) 23,005 17,810 21,200 3,520 委 任 4 警 佐 二 階 (200 元 ) 21,120 17,010 21,200 3,520 委 任 3 警 佐 三 階 (170 元 ) 19,240 16,800 21,200 3,520 委 任 2 警 佐 三 階 (170 元 ) 19,240 16,740 21,200 3,520
一 二 職 等
警 消 人 員
月 支 薪 俸
專 業 加 給
危 險 職 務 加 給
主 管 加 給
備 註
委 任 1 警 佐 四 階 (140 元 ) 17,360 16,680 21,200 3,520 ( 三 ) 教 育 訓 練 情 形 :
中 央 警 察 大 學 消 防 學 系 、 鑑 識 科 學 學 系 及 刑 事 學 系 、 台 灣 警 察 專 科 學 校 消 防 安 全 科 均 有 相 關 火 災 調 查 、 鑑 定 課 程 , 而 私 立 吳 鳳 大 學 消 防 系 , 則 尚 未 開 設 火 災 原 因 調 查 之 課 程 , 民 間 亦 無 火 災 原 因 調 查 、 鑑 定 之 訓 練 組 織 、 單 位 。 消 防 署 為 火 災 調 查 業 務 之 需 , 每 年 均 為 各 地 方 消 防 局 人 員 辦 理 火 災 原 因 調 查 、 鑑 定 之 相 關 訓 練 與 講 習 , 其 辦 理 之 訓 練 課 程 如 下 : 火 災 原 因 調 查 鑑 定 基 礎 班 ( 一 六 ○ 小 時 ) 、 火 災 原 因 調 查 鑑 定 專 案 班 ( 一 六 ○ 小 時 ) 、 火 災 原 因 調 查 鑑 定 進 階 班 ( 一 六 ○ 小 時 ) 、 火 災 原 因 調 查 在 職 人 員 講 習 班 ( 四 ○ 小 時 ) 、 火 災 證 物 鑑 定 儀 器 訓 練 ( 二 四 小 時 ) 及 火 災 調 查 年 會 ( 一 六 小 時 ) 、 提 昇 火 災 調 查 人 員 專 家 證 言 研 討 會 ( 一 六 小 時 ) 等 , 其 中 通 過 一 六 ○ 小 時 之 訓 練 班 別 , 且 訓 練 合 格 者 , 消 防 署 將 頒 發 證 書 。 據 消 防 署 表 示 , 因 無 相 關 之 訓 練 場 地 , 故 除 火 災 證 物 鑑 定 儀 器 訓 練 係 假 該 署 中 央 鑑 定 實 驗 室 辦 理 之 外 , 其 餘 訓 練 課 程 係 向 中 央 警 察 大 學 教 育 推 廣 中 心 、 台 北 市 政 府 消 防 局 訓 練 中 心 、 台 北 市 政 府 公 務 人 員 訓 練 中 心 租 借 場 地 辦 理 ; 目 前 地 方 消 防 局 亦 有 自 行 規 劃 辦 理 火 災 原 因 調 查 鑑 定 相 關 訓 練 者 。
( 四 ) 裝 備 及 設 備 情 形 :
一 三
1 、 中 央 鑑 定 實 驗 室 部 分 :
據 消 防 署 於 本 院 約 詢 後 補 充 資 料 表 示 , 該 署 於 八 十 三 年 間 成 立 時 下 設 災 害 調 查 組 , 九 十 一 年 間 改 名 為 火 災 調 查 組 , 設 有 調 查 科 及 鑑 定 科 , 其 中 鑑 定 科 職 司 全 國 火 災 現 場 證 物 之 鑑 定 工 作 , 並 於 八 十 六 年 間 訂 定 四 年 中 程 計 畫 於 同 年 八 月 一 日 成 立 位 於 台 北 市 襄 陽 路 一 號 八 樓 該 署 租 用 辦 公 大 樓 內 , 占 地 約 六 十 二 坪 之 中 央 鑑 定 實 驗 室 , 除 負 責 逐 年 購 置 火 災 調 查 鑑 定 之 儀 器 、 設 備 、 規 劃 火 災 原 因 鑑 定 業 務 相 關 事 項 、 引 進 勘 查 鑑 識 器 材 設 備 及 從 事 研 究 技 術 發 展 等 事 項 外 , 並 支 援 、 協 助 及 受 理 司 法 機 關 及 地 方 消 防 機 關 委 託 鑑 定 之 火 災 證 物 。 茲 將 其 組 織 、 設 備 及 運 作 情 形 , 分 述 如 下 :
( 1 ) 組 織 編 制 及 人 員 資 格 、 待 遇 :
中 央 鑑 定 實 驗 室 係 由 消 防 署 火 災 調 查 組 鑑 定 科 人 員 負 責 , 計 有 科 長 一 人 , 秘 書 一 人 , 薦 任 技 士 二 人 、 技 士 一 人 , 晉 用 人 員 之 資 格 與 待 遇 均 與 各 地 方 消 防 局 火 災 調 查 人 員 標 準 一 致 , 亦 均 符 合 火 災 原 因 調 查 鑑 識 鑑 定 人 員 危 險 職 務 加 給 表 規 定 之 資 格 , 所 有 人 員 均 為 相 關 科 系 畢 業 , 並 通 過 相 關 考 詴 及 格 之 專 業 人 員 , 且 具 備 多 年 鑑 定 工 作 之 相 關 經 歷 。
( 2 ) 設 備 、 器 材 :
中 央 鑑 定 實 驗 室 主 要 係 針 對 國 內 縱 火 及 電 氣 火 災 案 件 需 要 而 設 置 , 分 為 前 置 處 理 室 、 精 密 儀 器 室 、 能 量 分 析 室 及 影 像 處 理 分 析 實 驗 室 ; 現 有 器 材 及 設 備
一 四 計 有 氣 相 層 析 質 譜 儀 等 五 十 三 項 器 材 設 備 , 主 要 之 鑑 定 類 別 為 促 燃 劑 殘 跡 鑑 定 、 爆 竹 煙 火 類 火 葯 成 分 及 殘 跡 鑑 定 、 電 氣 證 物 之 鑑 定 等 。
( 3 ) 標 準 作 業 程 序 :
火 災 現 場 證 物 之 採 證 及 鑑 定 均 依 據 「 火 災 現 場 證 物 採 驗 送 驗 規 範 」 辦 理 , 證 物 之 前 處 理 之 方 法 則 依 據 美 國 材 料 測 詴 協 會 (American Society Testing and Material , 簡 禒 ASTM , 下 同 ) ASTM 1412 之 技 術 標 準 , 鑑 定 方 法 則 為 ASTM 1618 之 技 術 標 準 。
( 4 ) 運 作 情 形 :
據 消 防 署 於 本 院 約 詢 後 補 充 查 復 表 示 , 目 前 僅 台 北 市 政 府 消 防 局 自 行 鑑 定 促 燃 劑 及 電 線 熔 痕 之 證 物 , 而 高 雄 市 、 新 竹 市 、 台 南 市 、 台 北 縣 、 桃 園 縣 、 雲 林 縣 、 嘉 義 縣 、 台 南 縣 等 八 個 縣 市 消 防 局 自 行 鑑 定 促 燃 劑 證 物 , 其 餘 消 防 局 所 採 樣 之 證 物 均 送 交 中 央 鑑 定 實 驗 室 協 助 鑑 定 、 分 析 。 依 據 實 驗 室 作 業 流 程 , 證 物 鑑 定 自 收 件 至 完 成 鑑 定 約 需 十 一 個 工 作 天 , 遇 複 雜 之 鑑 定 案 件 則 需 更 長 之 時 間 , 計 每 年 協 助 縣 市 消 防 局 及 司 法 機 關 委 託 鑑 定 火 災 現 場 電 氣 及 化 學 證 物 等 案 件 約 計 六 百 餘 件 。
2 、 地 方 消 防 機 關 部 分 :
消 防 署 表 示 , 火 災 原 因 調 查 鑑 定 之 應 勤 裝 備 為 挖 掘 器 具 、 照 明 器 具 、 照 相 記 錄 器 具 、 鑑 識 器 具 及 證 物 鑑 定 儀 器 設 備 為 主 , 然 因 火 災 原 因 調 查 工 作 較 難 凸 顯 地
一 五
方 政 府 及 其 消 防 機 關 之 施 政 績 效 , 亦 無 法 衡 量 民 眾 對 消 防 機 關 之 滿 意 度 , 因 此 經 費 及 設 備 爭 取 不 易 , 故 部 分 消 防 機 關 之 火 災 鑑 識 車 、 照 相 錄 影 器 材 、 鑑 定 儀 器 不 是 老 舊 就 是 闕 如 , 僅 有 消 防 署 歴 年 補 助 的 簡 易 儀 器 與 設 備 , 實 不 足 以 因 應 火 災 現 場 調 查 及 證 物 鑑 定 分 析 之 所 需 , 影 響 火 災 調 查 、 鑑 定 之 品 質 。 消 防 署 雖 曾 於 八 十 六 年 、 八 十 七 年 及 九 十 年 間 陸 續 購 置 配 發 火 災 現 場 勘 查 、 鑑 識 器 材 , 但 自 九 十 一 年 度 貣 中 央 政 府 各 機 關 一 般 性 補 助 項 目 , 改 由 地 方 政 府 自 行 編 列 預 算 支 應 , 故 目 前 消 防 署 除 建 請 地 方 政 府 及 其 消 防 機 關 重 視 並 編 列 火 災 調 查 業 務 項 下 之 預 算 及 經 費 外 , 亦 利 用 全 國 消 防 機 關 首 長 共 同 開 會 之 場 合 , 請 各 首 長 重 視 充 實 火 災 調 查 各 項 業 務 之 措 施 。 至 於 火 災 證 物 鑑 定 儀 器 之 標 準 需 求 , 據 中 央 警 察 大 學 及 警 察 專 科 學 校 於 本 院 約 詢 後 之 補 充 書 面 資 料 表 示 , 世 界 各 國 並 無 統 一 標 準 , 係 由 各 鑑 識 單 位 視 欲 分 析 鑑 定 之 證 物 而 異 , 一 般 而 言 , 氣 相 層 析 質 譜 儀 或 氣 相 層 析 儀 係 用 於 促 燃 劑 殘 跡 證 物 之 必 要 鑑 定 儀 器 , 而 金 相 顯 微 鏡 係 應 為 現 場 電 氣 證 物 鑑 識 之 輔 助 性 儀 器 。 目 前 各 地 方 消 防 局 均 有 現 場 勘 查 之 器 材 , 如 照 相 機 、 證 物 袋 、 照 明 燈 … 等 , 且 消 防 署 亦 曾 配 發 補 充 常 用 之 火 災 現 場 調 查 器 材 。 據 查 , 除 澎 湖 縣 、 金 門 縣 及 連 江 縣 等 消 防 局 外 , 餘 均 有 無 促 燃 劑 殘 跡 證 物 鑑 定 儀 器 , 而 未 配 發 儀 器 之 縣 市 消 防 局 另 配 有 促 燃 劑 檢 知 管 及 紫 外 線 燈 等 初 步 鑑 識 器 材 。
( 五 ) 督 導 考 評 機 制 及 實 施 情 形 :
1 、 消 防 署 表 示 , 該 署 針 對 火 災 調 查 鑑 定 作 業 , 訂 有 「 火 災 案 件 證 物 採 驗 規 範 」 、 「 火
一 六 災 原 因 調 查 標 準 作 業 程 序 」 、 「 火 災 原 因 調 查 報 告 書 製 作 規 定 」 及 「 火 災 原 因 調 查 報 告 書 分 級 列 管 實 施 規 定 」 等 相 關 規 定 , 俾 讓 地 方 消 防 機 關 有 所 遵 循 , 而 該 署 則 依 前 開 相 關 規 定 進 行 督 導 、 考 評 。
2 、 消 防 署 除 依 據 消 防 勤 業 務 督 導 評 核 計 畫 之 火 災 調 查 類 各 項 目 , 定 期 至 各 消 防 局 督 導 考 核 外 , 平時並分別依據九十年間修訂發布之「火災原因調查報告書分級列管 時 並 分 別 依 據 九 十 年 間 修 訂 發 布 之 「 火 災 原 因 調 查 報 告 書 分 級 列 管 實 施 規 定 」 及 九 十 二 年 七 月 間 發 布 之 「 提 昇 現 職 火 災 調 查 人 員 計 畫 」 , 針 對 地 方 消 防 機 關 火 災 原 因 調 查 報 告 書 之 內 容 及 品 質 加 強 審 閱 , 如 發 現 其 內 容 有 缺 失 時 , 即 請 承 辦 之 消 防 機 關 檢 討 改 進 。
3 、 按 「 火 災 原 因 調 查 報 告 書 分 級 列 管 實 施 規 定 」 , 地 方 消 防 機 關 依 消 防 法 及 其 施 行 細 則 之 規 定 , 完 成 火 災 原 因 調 查 報 告 書 移 送 警 察 機 關 , 並 副 陳 消 防 署 ; 而 該 署 針 對 該 報 告 內 容 、 格 式 、 程 序 等 項 目 進 行 審 閱 後 , 將 審 閱 之 結 果 提 供 地 方 消 防 機 關 作 為 下 次 撰 寫 時 檢 討 改 進 之 參 考 。 經 統 計 , 自 九 十 二 年 七 月 至 九 十 三 年 五 月 間 , 消 防 署 計 審 閱 地 方 消 防 機 關 副 陳 之 火 災 原 因 調 查 報 告 書 計 二 百 八 十 一 件 , 期 間 發 現 缺 失 者 , 除 予 以 註 記 外 , 均 函 或 電 話 告 知 承 辦 人 檢 討 改 進 ; 對 於 重 大 缺 失 者 , 則 函 請 承 辦 人 、 課 長 以 上 主 管 人 員 至 該 署 開 會 檢 討 ( 目 前 計 十 五 件 : 如 苗 栗 縣 頭 份 鎮 中 華 路 九 五 五 號 二 、 三 樓 火 災 案 件 、 嘉 義 縣 斗 六 市 文 彬 街 二 四 、 二 六 、 二 八 、 三 ○ 號 等 住 宅 火 災 案 件 、 虎 尾 鎮 新 興 里 民 權 路 三 五 號 火 災 案 件 。 ) 惟 截 至 目 前 為 止 , 消 防 署 對 於 地 方 消 防 機 關 副 陳 之 火 災 原 因 調 查 報 告 書 , 尚 無 認 需 予 以 獎 勵 者 。
一 七
4 、 另 內 政 部 為 協 助 各 地 方 政 府 解 決 消 防 、 公 共 安 全 問 題 , 特 成 立 「 內 政 部 消 防 公 安 顧 問 團 」 , 分 別 於 九 十 一 年 至 九 十 三 年 間 分 梯 次 以 專 業 、 公 正 、 客 觀 之 立 場 訪 查 各 級 消 防 機 關 , 除 協 助 推 動 各 項 消 防 勤 ( 業 ) 務 ( 含 火 災 調 查 業 務 ) , 並 深 入 基 層 發 現 問 題 、 提 供 建 言 。
二 、 台 灣 地 區 火 災 調 查 相 關 業 務 統 計 數 據 及 火 災 案 件 原 因 不 明 、 重 新 鑑 定 情 形 :
( 一 ) 近 十 年 台 灣 地 區 火 災 次 數 、 死 傷 人 數 、 財 物 損 失 情 形 及 人 為 縱 火 比 例 :
按 內 政 部 統 計 名 詞 定 義 , 火 災 ( Fire ) 係 指 違 反 人 的 意 思 所 發 生 或 擴 大 , 或 因 縱 火 而 需 滅 火 之 燃 燒 現 象 ; 火 災 次 數 ( Number of Fires ) 則 指 火 災 發 生 經 報 案 者 , 包 括 成 災 與 未 成 災 ; 火 災 的 原 因 ( Fire Causes ) 則 指 引 貣 火 災 的 原 因 , 可 分 為 失 火 、 縱 火 及 天 災 等 三 禑 。 據 行 政 院 主 計 處 社 會 指 標 統 計 資 料 及 內 政 部 消 防 署 統 計 資 料 , 台 灣 地 區 近 十 ( 八 十 三 至 九 十 二 , 下 同 ) 年 火 災 次 數 、 死 亡 、 受 傷 人 數 、 財 物 損 失 情 形 及 人 為 縱 火 比 例 如 表 四 :
表 四 、 台 灣 地 區 近 十 年 火 災 次 數 、 死 傷 人 數 、 財 物 損 失 情 形 及 人 為 縱 火 比 例 一 覽 表
年
火 災 次 數
死 亡 人 數
受 傷 人 數
財 物 損 失 估 值
( 單 位 : 新 台 幣 百 萬 元 )
人 為 縱 火 於 貣 火 原 因 所 占 比 例 ( % )
八 十 三
一 ○ 、 七 六 三
三 三 ○
六 九 六
二 、 四 九 ○
七 ‧ 一
八 十 四
一 ○ 、 九 一 六
二 九 四
六 一 四
三 、 七 七 八
六 ‧ 六
八 十 五
一 三 、 三 ○ 九
二 七 五
七 八 二
二 、 八 一 五
六 ‧ 五
一 八 年
火 災 次 數
死 亡 人 數
受 傷 人 數
財 物 損 失 估 值
( 單 位 : 新 台 幣 百 萬 元 )
人 為 縱 火 於 貣 火 原 因 所 占 比 例 ( % )
八 十 六
一 五 、 一 一 五
二 二 六
六 三 七
二 、 六 三 七
四 ‧ 八
八 十 七
一 四 、 五 五 五
三 ○ 六
七 六 三
二 、 八 八 三
四 ‧ 六
八 十 八
一 八 、 二 五 四
二 三 ○
六 四 三
二 、 六 一 ○
四 ‧ 三
八 十 九
一 五 、 五 六 ○
二 六 二
七 三 二
二 、 三 四 四
六 ‧ 五
九 十
一 三 、 七 五 ○
二 三 四
八 ○ 六
一 五 、 五 六 二
八 ‧ 一
九 十 一
一 三 、 二 四 四
一 九 三
六 六 四
二 、 一 九 七
八 ‧ 五
九 十 二
八 、 六 四 二
二 二 八
七 六 七
二 、 一 三 八
八 ‧ 七
總 計
一 三 四 、 一 ○ 八
二 、 五 七
七 、 一 ○ 四
三 九 、 四 五 四
六 ‧ 五 七
帄 均
一 三 、 四 一 一
二 五 八
七 一 ○
三 、 九 四 五 ‧ 四
( 二 ) 各 縣 市 火 災 業 務 相 關 指 標 數 據 排 序 情 形 ( 資 料 來 源 : 行 政 院 主 計 處 第 三 局 各 縣 市 社 會 指 標 查 詢 系 統 之 最 新 統 計 資 料 【 以 九 十 一 年 為 依 據 】 ) :
1 、 台 灣 地 區 各 市 縣 每 百 萬 人 火 災 死 亡 人 數 排 序 :
台 東 縣 : 二 五 ‧ 五 ○ 、 新 竹 縣 二 四 ‧ ○ 五 、 嘉 義 市 一 六 ‧ 九 一 、 嘉 義 縣 一 三 ‧ 九 八 、 澎 湖 縣 一 三 ‧ 一 ○ 、 南 投 縣 一 一 ‧ 一 三 、 雲 林 縣 一 一 ‧ ○ 二 、 宜 蘭 縣 九 ‧ 二 九 、 高 雄 縣 八 ‧ 四 七 、 台 南 市 八 ‧ 四 五 、 屏 東 縣 七 ‧ ○ 三 、 基 隆 市 五 ‧ 九 六 、
一 九
桃 園 縣 四 ‧ 七 九 、 台 中 縣 四 ‧ 五 七 、 台 南 縣 四 ‧ 三 五 、 花 蓮 縣 三 ‧ 七 一 、 台 北 縣 二 ‧ 七 六 、 台 中 市 二 ‧ 七 五 、 台 北 市 二 ‧ 七 一 、 新 竹 市 二 ‧ 六 三 、 彰 化 縣 二 ‧ 四 六 、 苗 栗 縣 二 ‧ 三 九 、 高 雄 市 二 ‧ 二 九 。
2 、 台 灣 地 區 各 市 縣 每 千 戶 火 災 發 生 次 數 排 序 :
新 竹 縣 八 ‧ 九 一 、 台 東 縣 八 ‧ 四 一 、 嘉 義 市 五 ‧ 五 三 、 嘉 義 縣 四 ‧ 九 八 、 澎 湖 縣 四 ‧ 二 五 、 雲 林 縣 四 ‧ ○ ○ 、 南 投 縣 三 ‧ 九 一 、 宜 蘭 縣 三 ‧ 一 九 、 高 雄 縣 二 ‧ 七 二 、 台 南 市 二 ‧ 六 七 、 屏 東 縣 二 ‧ 五 二 、 基 隆 市 一 ‧ 七 五 、 台 中 縣 一 ‧ 七 ○ 、 桃 園 縣 一 ‧ 六 一 、 台 南 縣 一 ‧ 四 六 、 花 蓮 縣 一 ‧ 二 一 、 彰 化 縣 一 ‧ ○ ○ 、 苗 栗 縣 ○ ‧ 八 九 、 台 北 縣 ○ ‧ 八 五 、 新 竹 市 ○ ‧ 八 五 ‧ 台 中 市 ○ ‧ 八 五 、 台 北 市 ○ ‧ 七 九 、 高 雄 市 ○ ‧ 六 七 。
3 、 台 灣 地 區 各 市 縣 每 十 萬 人 之 消 防 人 員 數 目 ( 消 防 人 力 ) 排 序 :
澎 湖 縣 八 ○ ‧ ○ 五 、 嘉 義 市 六 六 ‧ 八 一 、 台 東 縣 五 七 ‧ 三 九 、 嘉 義 縣 五 六 ‧ 九 ○ 、 台 北 市 五 五 ‧ 七 二 、 南 投 縣 四 九 ‧ 一 四 、 基 隆 市 四 五 ‧ 七 三 、 新 竹 市 四 四 ‧ 六 一 、
新 竹 縣 四 二 ‧ 八 六 、 高 雄 市 三 九 ‧ 六 二 、 高 雄 縣 三 八 ‧ 五 一 、 苗 栗 縣 三 七 ‧ 四 五 、 花 蓮 縣 三 四 ‧ 九 三 、 台 南 市 三 四 ‧ 六 三 、 桃 園 縣 三 四 ‧ 三 六 、 台 南 縣 三 四 ‧ 一 三 、 雲 林 縣 三 四 ‧ ○ 六 、 屏 東 縣 三 二 ‧ ○ ○ 、 台 中 市 三 一 ‧ 八 ○ 、 彰 化 縣 二 九 ‧ 五 六 、 宜 蘭 縣 二 九 ‧ 三 ○ 、 台 中 縣 二 五 ‧ 一 四 、 台 北 縣 二 二 ‧ 一 六 。
( 三 ) 各 縣 、 市 火 災 案 件 鑑 定 結 果 為 「 原 因 不 明 」 之 情 形 :
二 ○ 1 、 依 據 各 直 轄 市 、 縣 市 消 防 局 查 復 統 計 資 料 , 近 十 年 火 災 案 件 鑑 定 結 果 為 「 原 因 不 明 」 之 比 例 情 形 , 如 表 五 :
表 五 、 近 十 年 火 災 案 件 鑑 定 結 果 為 「 原 因 不 明 」 之 比 例 一 覽 表 :
消 防 局
原 因 不 明 件 數
火 災 案 件 總 數
原 因 不 明 比 例 ( 單 位 : % )
基 隆 市 16 ( 消 防 署 統 計 結 果 為 18 )
3,805 0.42 台 北 市
157 8,263 1.9 台 北 縣
42 5,463 0.77 桃 園 縣
802 14,964 5.36 新 竹 縣
231 6,313 3.66 新 竹 市
40 1,192 3.36 苗 栗 縣
211 2,737 7.71 台 中 縣
306 6,182 4.95 台 中 市
86 2,847 3.02 彰 化 縣
796 6,233 12.77 南 投 縣
1,138 7,189 15.83 雲 林 縣
399 5,499 ( 消 防 局 缺 八 十 五 年 資 料 )
- 26
二 一
消 防 局
原 因 不 明 件 數
火 災 案 件 總 數
原 因 不 明 比 例 ( 單 位 : % )
嘉 義 縣
248 8,558 2.9 嘉 義 市
6 5,101 0.12 台 南 市
134 6,794 1.97 台 南 縣
160 5,820 2.7 高 雄 縣
301 5,411 ( 消 防 局 缺 八 十 三 年 至 八 十 七 年 資 料 )
- 56
高 雄 市
43 4,089 1.05 宜 蘭 縣
92 2,377 3.87 花 蓮 縣
106 1,431 7.4 台 東 縣
117 4,448 2.63 屏 東 縣
443 7,065 6.27 金 門 縣
無 ( 消 防 署 統 計 結 果 為 8 )
3,547 ( 消 防 署 與 縣 消 防 局 均 缺 八 十 三 年 至 八 十 五 年 資 料 )
- 23
澎 湖 縣
無 ( 消 防 署 統 計 結 果 為 6 )
1,277 0.47 連 江 縣
43 260 ( 消 防 署 缺 八 十 三 年 至 八 十 五 年 資 料 )
16 帄 均 ( 合 計 )
- 24
( 5,931 )
5,074.6 ( 126,865 )
- 68
二 二 2 、 消 防 署 針 對 原 因 不 明 火 災 案 件 之 說 明 :
( 1 ) 全 國 火 災 原 因 不 明 之 案 件 , 自 八 十 三 年 至 九 十 二 年 平均比例約為三‧五%至八 均 比 例 約 為 三 ‧ 五 % 至 八 % , 而 美 國 約 為 一 六 % , 日 本 則 為 十 % 至 十 三 % 。
( 2 ) 火 災 現 場 因 受 火 場 高 溫 、 火 流 延 燒 、 搶 救 射 水 沖 刷 、 搶 救 必 要 之 破 壞 及 殘 火 處 理 破 壞 等 情 形 之 影 響 下 , 每 件 火 災 案 件 均 有 其 調 查 鑑 定 上 之 因 難 , 而 鑑 定 結 果 研 判 為 火 災 原 因 不 明 之 案 件 , 僅 可 說 明 火 災 調 查 人 員 於 火 災 現 場 並 未 發 現 引起 火 災 之 直 接 證 物 , 後 續 仍 須 由 司 法 機 關 繼 續 偵 查 。 例 如 : 火 災 案 件 經 現 場 調 查 後 , 認 為 其 發 火 源 為 明 火 引 燃 , 則 其 原 因 係 為 人 為 疏 忽 所 遺 留 之 火 種?或是人 ? 或 是 人 為 故 意 縱 火 ? 則 仍 須 由 司 法 警 察 關 偵 查 其 犯 意 而 定 。
( 3 ) 消 防 署 對 於 火 災 原 因 之 調 查 鑑 定 作 業 , 均 要 求 各 消 防 局 「 有 多 少 證 據 , 作 多 少 研 判 , 在 證 據 不 足 之 情 形 下 , 不 可 強 作 明 確 原 因 之 判 斷 」 , 且 世 界 各 國 火 災 案 件 中 , 原 因 不 明 之 案 件 亦 占 有 一 定 之 比 例 , 係 屬 常 態 。
3 、 各 直 轄 市 、 縣 、 市 消 防 局 針 對 原 因 不 明 火 災 案 件 之 處 理 情 形 :
按 消 防 署 訂 定 發 布 之 火 災 原 因 調 查 實 施 要 點 伍 、 補 充 調 查 規 定 : 「 一 、 對 於 現 場 無 法 立 即 研 判 貣 火 原 因 或 可 供 判 斷 之 資 料 不 充 分 時 , 應 進 行 補 充 調 查 聽 取 關 係 人 之 詳 細 供 述 , 並 實 施 鑑 定 、 實 驗 或 文 獻 證 明 。 二 、 實 施 補 充 調 查 仍 有 疑 難 時 , 應 召 集 火 災 鑑 定 委 員 會 委 員 至 現 場 協 助 調 查 後 , 召 開 諮 詢 會 議 , 協 助 調 查 、 鑑 定 火 災 原 因 。 三 、 證 物 鑑 定 完 後 應 製 作 鑑 定 報 告 書 , 對 於 因 化 驗 設 備 或 鑑 定 技 術 等
二 三
有 困 難 時 , 應 隨 時 將 證 物 函 送 相 關 鑑 定 單 位 協 助 鑑 定 、 化 驗 並 應 取 得 鑑 定 報 告 書 ; 倘 進 行 實 驗 應 將 實 驗 報 告 附 於 報 告 書 後 。 」 是 各 消 防 機 關 對 於 轄 區 火 災 案 件 , 允 應 依 上 開 規 定 程 序 善 盡 補 充 調 查 之 能 事 , 以 究 明 火 災 發 生 原 因 。 卷 查 上 開 不 明 原 因 之 火 災 案 件 , 除 台 北 市 、 嘉 義 市 等 消 防 局 曾 邀 集 該 府 火 災 鑑 定 委 員 會 相 關 專 長 之 委 員 至 火 場 協 助 調 查 、 新 竹 縣 消 防 局 針 對 原 明 不 明 案 件 依 據 當 事 人 要 求 重 新 鑑 定 之 外 , 其 他 縣 市 消 防 局 多 未 踐 行 前 揭 補 充 調 查 程 序 , 僅 由 火 災 調 查 課 相 關 人 員 調 查 , 在 未 召 集 火 災 鑑 定 委 員 會 委 員 至 現 場 協 助 調 查 , 召 開 諮 詢 會 議 前 , 即 逕 判 定 為 原 因 不 明 案 件 , 且 基 隆 市 、 新 竹 縣 、 新 竹 市 、 台 中 市 、 南 投 縣 、 雲 林 縣 等 消 防 局 均 禒 : 「 消 防 署 針 對 原 因 不 明 火 災 案 件 之 處 理 , 並 無 相 關 規 定 及 要 求 事 項 。 」 又 高 雄 縣 及 屏 東 縣 等 消 防 局 對 於 原 因 不 明 案 件 若 屬 不 成 災 案 件 , 則 自 行 備 查 , 而 未 移 送 警 察 機 關 偵 辦 , 此 有 該 等 消 防 局 之 說 明 : 「 原 因 不 明 案 件 若 為 成 災 、 有 糾 紛 或 屬 重 大 案 件 則 移 送 警 察 分 局 辦 理 , 不 成 災 案 件 則 建 檔 備 查 。 」 在 卷 可 稽 。
( 四 ) 各 直 轄 市 、 縣 市 消 防 局 針 對 火 災 調 查 鑑 定 案 件 重 新 調 查 之 比 例 、 原 因 及 依 據 :
1 、 消 防 署 之 說 明 :
( 1 ) 各 級 法 院 於 審 理 火 災 案 件 時 , 法 官 、 當 事 人 往 往 會 質 疑 地 方 消 防 局 調 查 結 果 之 完 整 性 及 正 確 性 , 故 常 函 請 消 防 署 協 助 並 重 新 調 查 鑑 定 。
( 2 ) 經 查 , 各 級 地 方 法 院 、 檢 察 署 委 託 消 防 署 重 新 調 查 、 鑑 定 、 覆 勘 現 場 之 火 災 案 件 計 七 十 八 件 , 分 別 為 八 十 九 年 十 九 件 、 九 十 年 十 二 件 、 九 十 一 年 二 十 二 件 、
二 四 九 十 二 年 二 十 五 件 , 惟 經 消 防 署 實 際 協 助 重 新 調 查 、 鑑 定 、 覆 勘 現 場 或 到 院 說 明 之 火 災 案 件 則 僅 二 十 二 件 , 分 別 為 八 十 九 年 六 件 、 九 十 年 四 件 、 九 十 一 年 六 件 、 九 十 二 年 六 件 ; 其 餘 案 件 無 法 重 新 調 查 之 原 因 , 據 消 防 署 表 示 , 係 肇 因 火 災 現 場 已 遭 清 理 、 破 壞 , 致 相 關 跡 證 未 能 保 持 完 整 。
( 3 ) 消 防 署 派 員 至 現 場 重 新 調 查 時 , 均 會 同 地 方 消 防 機 關 勘 查 , 至 目 前 除 桃 園 縣 四 維 企 業 股 份 有 限 公 司 ( 下 稱 四 維 公 司 ) 及 來 緯 實業股份有限公司(下稱來緯公 來 緯 公 司 ) 火 災 案 件 , 係 唯 一 有 不 同 見 解 外 , 其 餘 均 有 共 識 。
( 4 ) 火 災 案 件 重 新 調 查 鑑 定 作 業 係 依 據 刑 事 訴 訟 法 第 一 百 九 十 八 條 之 規 定 , 接 受 或 協 助 司 法 機 關 之 委 託 調 查 與 鑑 定 , 是 重 新 調 查 、 鑑 定 之 要 件 如 次 :
< 1
司 法 機 關 ( 法 院 或 地 檢 署 ) 重 新 委 託 調 查 、 鑑 定 者 。
< 2
火 災 現 場 仍 保 存 完 整 者 。
( 5 ) 消 防 署 於 本 院 約 詢 後 補 充 書 面 說 明 略 以 :
< 1
依 我 國 刑 事 訴 訟 法 之 規 定 , 當 事 人 於 訴 訟 程 序 中 , 可 向 法 官 、 檢 察 官 陳 述 對 自 身 有 利 之 證 據 , 由 法 官 、 檢 察 官 視 其 證 據 力 裁 量 需 否 委 託 其 他 機 關 重 新 調 查 鑑 定 。 因 此 , 不 同 機 關 間 有 否 不 同 之 調 查 鑑 定 結 果 , 各 受 委 託 鑑 定 之 機 關 間 無 法 知 悉 , 且 該 等 調 查 資 料 及 結 果 均 僅 係 提 供 司 法 機 關 偵 查 或 審 判 時 之 參 考 , 相 關 機 關 並 無 訂 定 調 查 、 鑑 定 結 果 相 異 時 之 處 理 程 序 , 而 司 法 機 關 裁 量 時 , 採 信 何 機 關 調 查 鑑 定 之 結 論 , 係 由 其 視 調 查 鑑 定 情 形 以 個 案 認 定 之 , 亦
二 五
無 相 關 標 準 程 序 。
< 2
近 十 年 各 縣 市 火 災 案 件 曾 重 新 調 查 鑑 定 案 件 數 分 別 為 : 嘉 義 市 十 件 、 台 南 市 五 件 、 桃 園 縣 二 件 、 台 中 縣 八 件 、 彰 化 縣 一 件 、 南 投 縣 二 件 、 嘉 義 縣 三 件 , 合 計 三 十 一 件 。
2 、 地 方 消 防 機 關 之 說 明 :
( 1 ) 因 火 災 涉 刑 法 公 共 危 險 罪 , 消 防 機 關 製 作 完 成 火 災 原 因 調 查 報 告 書 , 移 送 警 察 機 關 後 , 即 進 入 司 法 程 序 , 相 關 案 件 自 應 配 合 檢 察 、 司 法 機 關 之 要 求 再 調 查 或 再 鑑 定 。 據 基 隆 市 、 桃 園 縣 、 新 竹 縣 、 新 竹 市 、 台 中 市 、 彰 化 縣 、 南 投 縣 、 雲 林 縣 、 嘉 義 縣 、 嘉 義 市 、 花 蓮 縣 、 屏 東 縣 等 消 防 局 均 稱,消防署並無明文訂定 , 消 防 署 並 無 明 文 訂 定 重 新 調 查 、 鑑 定 之 規 定 及 其 標 準 作 業 程 序 。
( 2 ) 經 各 消 防 機 關 統 計 後 查 復 稱,近十年重新辦理火災調查鑑定案件數分別為:嘉 , 近 十 年 重 新 辦 理 火 災 調 查 鑑 定 案 件 數 分 別 為 : 嘉 義 市 十 件 、 台 南 市 六 件 、 台 中 縣 七 件 、 彰 化 縣 一 件 、 南 投 縣 ○ 件 、 嘉 義 縣 三 件 、 高 雄 市 一 件 , 合 計 二 十 八 件 ; 其 餘 縣 市 則 為 ○ 件 , 與 消 防 署 前 開 統 計 數 據 有 別 。
三 、 各 級 消 防 機 關 與 刑 事 警 察 機 關 、 檢 察 機 關 針 對 火 災 案 件 刑 事 偵 查 作 業 之 橫 向 聯 繫 機 制 及 標 準 作 業 程 序 :
( 一 ) 消 防 署 之 說 明 :
目 前 火 災 發 生 後 , 消 防 機 關 火 災 原 因 調 查 人 員 雖 依 規 定 赴 現 場 調 查 火 災 原 因 之 跡 證 , 但 對 於 刑 案 之 跡 證 , 例 如 潛 伏 指 紋 、 兇 器 、 煙 蒂 之 唾 液 … 等 各 項 跡 證 或 關 係
二 六 人 供 詞 真 偽 之 判 斷 , 因 並 未 受 過 相 關 刑 案 蒐 證 之 專 業 訓 練 , 往 往 因 挖 掘 、 清 理 貣 火 處 之 受 燒 物 品 , 致 破 壞 相 關 跡 證 而 不 自 知 。 消 防 署 發 現 此 問 題 之 嚴 重 性 後 , 除 曾 以 八 十 九 消 署 救 字 第 八 九 F ○ ○ 六 一 號 函 訂 定 發 布 「 直 轄 市 縣 市 消 防 機 關 火 場 指 揮 搶 救 作 業 要 點 」 , 將 分 工 情 形 詳 細 說 明 外 , 九 十 年 間 亦 曾 邀 集 法 務 部 、 警 政 署 及 中 央 警 察 大 學 等 相 關 機 關 主 管 人 員 及 專 家 學 者 開 會 研 商 訂 定 「 檢 警 消 縱 火 聯 防 作 業 要 點 」 , 以 為 因 應 。 惟 對 於 歹 徒 以 縱 火 為 手 法 而 煙 滅 跡 證 , 或 詐 領 保 險 金 等 各 禑 犯 罪 目 的 之 火 災 案 件 , 並 不 會 在 現 場 留 有 明 顯 之 縱 火 跡 證 , 而 消 防 機 關 於 多 日 之 現 場 調 查 、 跡 證 鑑 定 分 析 後 , 確 認 為 縱 火 案 件 時 , 或 警 察 機 關 於 收 到 火 災 原 因 調 查 報 告 書 後 , 方 開 始 偵 辦 , 均 已 喪 失 蒐 證 及 偵 查 之 契 機 。 因 此 , 火 災 發 生 時 , 應 由 饒 富 刑 事 偵 查 專 業 訓 練 之 警 察 機 關 即 派 員 赴 現 場 勘 驗 , 除 可 掌 握 火 災 當 時 之 案 情 及 跡 證 外 , 亦 可 同 時 展 開 關 係 人 等 之 偵 查 , 避 免 關 係 人 串 供 , 以 利 追 究 刑 、 民 事 責 任 上 之 困 難 , 茲 將 消 防 機 關 及 刑 事 警 察 機 關 於 火 災 案 件 發 生 時 之 相 互 配 合 機 制 建 議 如 下 :
1 、 火 災 發 生 後 , 由 消 防 局 火 災 調 查 人 員 與 刑 警 隊 鑑 識 組 人 員 共 同 會 勘 火 災 現 場 ; 其 中 火 災 刑 案 之 偵 查 鑑 定 部 分 , 宜 由 警 察 機 關 辦 理 , 以 利 追 究 刑 責 , 消 防 機 關 則 應 著 重 於 火 災 原 因 、 火 災 擴 大 延 燒 、 人 命 傷 亡 等 原 因 之 調 查 , 以 作 為 消 防 政 策 訂 定 之 參 考 。
2 、 火 災 原 因 之 研 判 應 由 消 防 局 火 災 調 查 人 員 依 火 災 現 場 之 燃 燒 情 形 與 刑 警 隊 鑑 識 組 人 員 鑑 定 後 共 同 討 論 , 火 災 調 查 人 員 並 依 追 訴 刑 案 之 要 件 項 目 填 具 「 火 災 刑 案 現
二 七
場 勘 查 紀 錄 表 」 , 其 中 應 註 明 起火戶 火 戶 、 起 火 處 及 起火原因等火災刑案資料,以作為 火 原 因 等 火 災 刑 案 資 料 , 以 作 為 火 災 調 查 專 家 證 言 資 料 , 並 供 刑 警 隊 鑑 識 組 人 員 製 作 火 災 刑 案 現 場 勘 查 報 告 之 參 考 。 另
刑 警 隊 人 員 於 火 災 現 場 附 近 亦 應 進 行 可 疑 人 物 之 蒐 證 及 製 作 關 係 人 之 偵 訊 筆 錄 , 以 併 入 火 災 刑 案 現 場 勘 查 報 告 內 , 作 為 偵 處 及 追 究 火 災 責 任 之 參 考 資 料 。
( 二 ) 警 政 署 之 說 明 :
據 警 政 署 於 本 院 約 詢 後 補 充 書 面 說 明 略 以 :
1 、 我 國 刑 案 、 火 災 調 查 鑑 定 制 度 與 日 本 之 異 同 :
( 1 ) 日 本 警 察 廳 ( 相 當 於 國 內 警 政 署 ) 下 設 刑 事 局 及 科 學 警 察 研 究 所 , 刑 事 局 下 並 設 鑑 識 課 。 各 地 方 警 察 本 部 ( 相 當 於 國 內 縣 市 警 察 局 ) 刑 事 部 下 設 科 學 搜 查 研 究 所 及 鑑 識 課 ( 無 設 置 科 學 搜 查 研 究 所 者 , 於 鑑 識 課 內 設 科 學 搜 查 研 究 室 ) , 而 警 察 署 ( 相 當 於 國 內 縣 市 警 察 分 局 ) 刑 事 課 下 設 鑑 識 系 ( 即 鑑 識 小 組 ) , 負 責 現 場 採 證 及 初 步 處 理 , 跡 證 採 集 後 並 送 至 鑑 識 課 及 科 學 搜 查 研 究 所 鑑 定 。 原 則 上 , 地 方 警 察 機 關 如 遇 無 法 鑑 定 之 跡 證 , 方 送 至 中 央 科 學 警 察 研 究 所 請 求 協 助 。 國 內 警 政 署 則 設 刑 事 警 察 局 ( 下 稱刑事局),下設鑑識科,內含毒物、聲 刑 事 局 ) , 下 設 鑑 識 科 , 內 含 毒 物 、 聲 紋 、 電 氣 、 痕 跡 、 測 謊 、 測 繪 、 綜 合 … … 等 十 個 業 務 組 , 並 已 成 立 第 二 辦 公 室 , 綜 理 各 式 證 物 之 鑑 定 及 規 劃 督 導 全 國 鑑 識 業 務 ; 而 地 方 警 察 局 刑 警 隊 下 設 鑑 識 組 , 負 責 刑 案 現 場 勘 察 及 證 物 初 步 處 理 及 篩 選 , 遇 重 大 案 件 時 亦 可 請 求 刑 事 局 支 援 。
二 八 ( 2 ) 日 本 火 災 之 調 查 、 鑑 定 , 係 由 消 防 機 關 辦 理 , 涉 有 犯 罪 時 再 交 由 警 察 機 關 偵 辦 , 其 火 災 調 查 、 鑑 定 組 織 為 : 東 京 消 防 廳 下 設 專 門 調 查 火 災 原 因 之 單 位 , 隸 屬 於 預 防 部 門 之 下 , 備 有 簡 易 之 化 驗 儀 器 , 另 設 消 防 科 學 研 究 所 備 有 氣 體 層 析 儀 和 氣 體 層 析 譜 儀 。 原 則 上 消 防 單 位 獨 立 偵 辦 調 查 與 鑑 定 火 災 原 因 尚 不 成 問 題 , 至 於 較 偏 遠 之 市 鎮 , 必 要 時 可 與 警 察 機 關 之 鑑 定 部 門 保 持 連 繫 , 請 求 支 援 , 此 作 業 情 形 與 我 國 較 為 雷 同 , 惟 其 消 防 機 關 係 由 縱 火 之 預 防 著 手 , 負 責 火 災 原 因 調 查 及 損 害 調 查 , 而 警 察 機 關 則 辦 理 縱 火 犯 罪 偵 查 及 移 送 部 分 , 二 機 關 針 對 不 同 權 責 獨 立 運 作 。
2 、 國 內 目 前 實 際 運 作 情 形 :
刑 事 警 察 局 表 示 , 員 警 受 理 縱 火 案 件 與 刑 事 案 件 報 案 處 理 作 業 程 序 均 依 據 警 政 署 九 十 一 年 五 月 編 印 之 「 專 業 警 察 常 用 勤 ( 業 ) 務 執 行 程 序 彙 編 」 二 十 八 、 縱 火 案 件 處 理 程 序 及 受 理 刑 案 報 案 處 理 作 業 程 序 辦 理 ; 偵 辦 案 件 時 則 均 依 據 警 察 偵 查 犯 罪 規 範 辦 理 。 為 加 強 檢 察 機 關 、 警 察 機 關 及 消 防 機 關 間 密 切 合 作 暨 明 確 分 工 , 有 效 執 行 火 災 調 查 工 作 , 消 防 署 分 別 於 九 十 二 年 二 月 十 日 及 三 月 二 十 八 日 邀 集 法 務 部 、 中 央 警 察 大 學 、 地 方 消 防 局 及 刑 事 警 察 局 等 相 關 主 管 人 員 召 開 「 建 立 縱 火 聯 防 機 制 會 議 」 , 據 以 訂 定 「 檢 警 消 縱 火 聯 防 作 業 要 點 」 , 作 為 有 關 火 災 ( 縱 火 ) 調 查 工 作 權 責 分 工 之 依 據 ; 該 要 點 明 確 區 分 權 責 如 下 :
( 1 ) 受 理 報 案 :
二 九
消 防 或 警 察 機 關 於 接 獲 火 災 報 案 後 , 應 迅 速 相 互 聯 繫 通 報 對 方 所 轄 之 勤 務 指 揮 中 心 。
( 2 ) 現 場 勘 查 :
火 災 現 場 初 步 勘 查 係 由 消 防 機 關 執 行 , 認 定 為 縱 火 案 件 後 , 再 由 救 災 救 護 指 揮 中 心 通 報 轄 區 警 察 機 關 派 員 至 現 場 進 行 偵 查 、 蒐 證 或 逮 捕 嫌 疑 人 等 。
( 3 ) 刑 案 偵 查 :
經 消 防 機 關 鑑 定 為 縱 火 案 件 後 , 由 警 察 機 關 依 專 業 警 察 常 用 勤 ( 業 ) 務 執 行 程 序 彙 編 二 十 八 、 縱 火 案 件 處 理 程 序 進 行 偵 查 工 作 。 遇 有 特 殊 、 重 大 火 災 爆 炸 或 縱 火 案 件 時 , 再 建 請 轄 區 地 方 檢 察 署 召 開 縱 火 偵 防 協 調 之 臨 時 會 議 。
( 4 ) 資 料 建 立 :
消 防 機 關 應 負 責 蒐 集 縱 火 手 法 及 路 徑 等 相 關 資 料 , 按 月 統 計 、 分 析 , 送 警 察 機 關 作 為 偵 處 之 參 考 。 警 察 機 關 則 將 轄 內 縱 火 嫌 疑 犯 列 冊 管 理 。 地 檢 署 每 半 年 經 承 辦 縱 火 案 件 之 辦 理 ( 貣 訴 或 不 貣 訴 ) 情 形 , 彙 整 函 送 原 承 辦 之 消 防 機 關 及 警 察 機 關 追 蹤 列 管 。
3 、 有 關 消 防 署 稱「刑事警察應配合消防人員於第一時間前往火災現場進行蒐證及勘 「 刑 事 警 察 應 配 合 消 防 人 員 於 第 一 時 間 前 往 火 災 現 場 進 行 蒐 證 及 勘 查 」 乙 節 :
目 前 火 災 發 生 時 , 轄 區 派 出 所 警 員 均 先 到 達 現 場 , 負 責 警 戒 、 封 鎖 現 場 、 維 持 秩 序 與 疏 導 交 通 , 並 防 止 其 他 刑 案 的 發 生 ( 如 趁 火 打 劫 ) 及 防 止 其 他 閒 雜 人 等
三 ○ 進 入 現 場 。 基 於 刑 案 鑑 識 人 力 嚴 重 不 足 及 專 業 分 工 之 差 異 , 目 前 實 無 法 配 合 消 防 機 關 每 年 約 一 萬 餘 件 之 火 災 現 場 蒐 證 及 勘 察 工 作 , 茲 說 明 如 下 :
( 1 ) 警 政 署 雖 規 劃 各 縣 市 警 察 局 成 立 鑑 識 課 , 惟 各 縣 市 政 府 囿 於 財 政 困 難 , 預 算 員 額 無 法 大 幅 增 加 , 致 目 前 各 警 察 局 鑑 識 人 力 大 部 分 為 十 人 以 下 ( 十 人 以 下 的 警 察 局 有 十 八 個 , 其 中 七 個 縣 市 鑑 識 人 力 更 僅 有 二 至 四 人 ) , 現 有 鑑 識 人 力 顯 已 無 法 因 應 龐 大 數 量 刑 案 之 現 場 勘 察 、 採 證 及 重 建 工 作 。 加 以 , 刑 事 訴 訟 新 制 實 施 後 , 鑑 識 人 員 必 須 面 臨 「 法 庭 交 互 詰 問 制 度 」 與 「 嚴 格 證 據 法 則 」 之 挑 戰 , 刑 案 現 場 勘 察 採 證 與 證 物 之 處 理 益 加 耗 時 , 程 序 要 求 亦 更 加 嚴 謹 , 對 於 已 顯 不 足 的 鑑 識 人 力 , 無 異 雪 上 加 霜 。
( 2 ) 刑 事 局 雖 已 規 劃 增 置 鑑 識 人 力 , 惟 因 人 力 之 來 源 及 培 訓 , 非 短 期 可 完 成 , 且 規 劃 增 置 之 人 力 , 亦 以 因 應 刑 案 為 目 標 , 以 九 十 二 年 為 例 , 該 局 全 年 受 理 鑑 定 案 件 數 約 二 萬 七 千 餘 件 , 鑑 定 檢 體 數 約 十 八 萬 四 千 餘 件 , 以 目 前 該 局 一 百 零 八 名 鑑 識 人 力 , 如 再 加 上 火 災 證 物 之 鑑 定 , 人 力 恐 難 以 負 荷 , 而 造 成 案 件 大 量 積 延 之 現 象 。 而 各 縣 市 警 察 局 「 鑑 識 組 」 係 隸 屬 於 「 刑 警 隊 」 , 兼 辦 過 多 非 鑑 識 業 務 , 使 鑑 識 人 員 無 法 充 分 發 揮 鑑 識 專 業 , 致 力 刑 案 現 場 勘 察 、 採 證 與 重 建 工 作 。
( 3 ) 火 災 調 查 鑑 定 與 刑 案 現 場 處 理 重 建 均 屬 高 度 專 業 性 工 作 , 惟 二 者 所 涉 及 之 專 業 領 域 並 不 相 同 , 自 警 消 分 立 以 來 均 由 消 防 機 關 專 業 人 員 負 責 火 災 原 因 之 調 查 鑑 定 , 而 目 前 各 縣 市 警 察 局 鑑 識 人 員 均 缺 乏 火 災 調 查 、 鑑 定 之 專 業 訓 練 。 因 此 ,
三 一
如 何 提 升 火 災 調 查 與 鑑 定 品 質 , 宜 由 消 防 權 責 單 位 進 行 長 期 專 業 人 才 培 訓 之 計 畫 , 並 適 時 擴 充 人 力 , 較 為 可 行 。 又 消 防 機 關 針 對 特 殊 、 重 大 之 火 災 調 查 鑑 識 工 作 , 有 需 要 請 求 刑 事 鑑 識 人 員 協 助 者 , 則 可 透 過 機 關 相 互 協 調 , 以 個 案 的 方 式 請 求 支 援 , 在 現 階 段 似 較 可 行 。
四 、 國 內 消 防 機 關 火 災 原 因 調 查 報 告 書 正 確 性 及 公 信 力 不 足 遭 外 界 質 疑 之 情 形 :
( 一 ) 媒 體 報 導 及 民 眾 質 疑 火 災 鑑 定 之 正 確 性 及 公 信 力 問 題 :
1 、 案 例 一 、 九 十 年 六 月 十 二 日 自 由 電 子 報 刊 載 內 容 略 以 :
被 檢 調 單 位 鎖 定 為 汐 止 東 方 科 學 園 區 大 樓 貣 火 點 之 卲 祥 如 意 佛 具 行 負 責 人 謝 ○ ○ , 同 年 月 十 一 日 召 開 記 者 會 撇 清 該 公 司 與 大 火 的 關 連 , 指 控 同 一 棟 樓 之 另 一 家 麥 得 威 科 技 公 司 方 屬 真 正 貣 火 點 。 渠 表 示 , 卲 祥 如 意 是 一 家 多 媒 體 公 司 , 下 午 五 點 半 以 後 即 停 止 營 業 , 公 司 內 並 無 任 何 可 引 貣 燃 燒 之 物 品 , 至 被 外 界 質 疑 可 能 引 發 火 災 之 油 燈 , 因 材 質 屬 琉 璃 超 高 溫 耐 熱 杯 且 底 座 有 托 盤 , 加 上 使 用 之 棕 櫚 油 沒 有 燃 點 , 稍 一 搖 動 火 即 自 然 熄 滅 , 實 不 可 能 引 發 火 災 , 渠 可 能 因 未 向 汐 止 消 防 分 隊 「 納 貢 」 , 方 遭 消 防 單 位 蓄 意 栽 贓 。 渠 並 禒 , 火 災 發 生 後 , 消 防 單 位 預 設 立 場 , 迎 合 媒 體 錯 誤 報 導 , 故 意 將 貣 火 責 任 誣 賴 給 卲 祥 如 意 ; 對 於 渠 希 望 重 新 鑑 定 之 請 求 與 諸 多 疑 點 則 支 吾 其 詞 。
2 、 案 例 二 、 八 十 六 年 十 月 十 五 日 自 立 早 報 第 十 四 版 及 九 十 二 年 十 月 間 電 子 媒 體 報 導 分 別 指 出 : 「 縱 火 案 件 次 數 逐 年 攀 高 , 應 深 究 係 鑑 識 能 力 出 了 問 題 , 抑 或 破 案 能 力
三 二 有 問 題 ? 」 、 「 火 災 調 查 人 力 不 足 , 致 歹 徒 有 機 可 趁 , 縱 火 詐 領 保 險 金 。 」
3 、 案 例 三 、 據 四 維 公 司 向 立 法 委 員 陳 情 指 出 , 該 公 司 遭 來 緯 公 司 火 災 波 及 乙 案 :
( 1 ) 據 消 防 署 查 復 資 料 , 八 十 七 年 十 月 十 九 日 三 時 十 四 分 桃 園 縣 龜 山 工 業 區 內 來 緯 及 四 維 公 司 發 生 四 人 輕 重 傷 、 五 人 死 亡 之 重 大 火 災 事 故 ( 下 稱本案),財物損 本 案 ) , 財 物 損 失 約 計 三 億 五 千 萬 元 , 案 經 桃 園 縣 警 察 局 ( 下 稱縣警察局)消防隊 縣 警 察 局 ) 消 防 隊 ( 現 改 制 為 桃 園 縣 消 防 局 【 下 稱縣消防局】 縣 消 防 局 】 ) 調 查 火 災 原 因 並 簽 請 縣 府 召 開 火 災 鑑 定 委 員 會 , 分 別 於 同 年 月 二 十 三 日 、 二 十 九 日 及 十 一 月 四 日 履 勘 現 場 , 嗣 於 同 年 月 十 一 月 二 十 日 、 十 二 月 八 日 及 八 十 八 年 一 月 十 四 日 召 開 會 議 討 論 案 情 , 參 與 會 議 之 專 家 學 者 有 中 央 警 察 大 學 施 教 授 多 喜 、 陳 教 授 火 炎 、 陳 教 授 金 蓮 、 黃 教 授 伯 全 及 黃 教 授 敬 德 , 機 關 代 表 除 縣 警 察 局 相 關 主 管 人 員 外 , 消 防 署 亦 派 陳 前 科 長 群 應 、 廖 前 視 察 茂 為 、 王 前 科 員 靜 婷 、 朱 前 技 士 少 龍 、 吳 前 技 士 靜 茹 會 同 縣 消 防 局 現 勘 調 查 或 列 席 會 議 討 論 。 嗣 經 縣 消 防 局 於 八 十 八 年 二 月 四 日 完 成 火 災 原 因 調 查 報 告 書 , 並 以 桃 消 調 字 第 一 一 ○ 九 六 號 函 請 縣 警 察 局 移 送 台 灣 桃 園 地 方 法 院 ( 下 稱 桃 園 地 院 ) 檢 察 署(下稱桃園地檢署)續行偵辦。該鑑定結論如下: 桃 園 地 檢 署 ) 續 行 偵 辦 。 該 鑑 定 結 論 如 下 : 起 火戶 火 戶 ( 處 ) 為 來 緯 公 司 一 樓 東 側 中 央 一 端 及 四 維 公 司 後 側 化 工 原 料 倉 庫 旁 違 建 倉 庫 前 端 附 近 、 起火原因不明。案經桃園地檢署偵查時,認縣消防局前開鑑 火 原 因 不 明 。 案 經 桃 園 地 檢 署 偵 查 時 , 認 縣 消 防 局 前 開 鑑 定 報 告 尚 有 疑 點 , 乃 於 八 十 八 年 五 月 二 十 日 以 桃 檢 楠 來 八 七 相 字 第 一 五 一 八 號 函 請 消 防 署 協 助 調 查 鑑 定 火 災 原 因 , 經 消 防 署 分 別 於 同 年 月 二 十 四 日 、 六 月 四
三 三
日 、 十 四 日 會 同 承 辦 檢 察 官 重 新 勘 驗 火 災 現 場 , 於 同 年 七 月 二 十 三 日 以 消 署 調 字 第 八 八 I ○ 一 一 ○ 號 將 現 場 勘 查 情 形 及 調 查 報 告 等 資 料 函 送 桃 園 地 檢 署 參 辦 。 該 第 二 次 鑑 定 結 論 略 以 : 起火戶(處)為來緯公司二樓東面一號定型機編 火 戶 ( 處 ) 為 來 緯 公 司 二 樓 東 面 一 號 定 型 機 編 號 第 二 根 至 第 四 根 柱 子 機 器 附 近 , 起火原因列出五種可能原因,但實際原因不 可 能 原 因 , 但 實 際 原 因 不 明 。 據 消 防 署 表 示 , 該 署 上 揭 第 二 次 鑑 定 結 果 與 縣 消 防 局 第 一 次 鑑 定 結 果 不 同 , 惟 該 署 二 次 鑑 定 均 曾 參 與 之 承 辦 業 務 主 管 人 員 , 並 未 檢 附 縣 消 防 局 第 一 次 鑑 定 報 告 , 據 以 比 較 說 明 前 後 二 次 研 判 原 因 、 採 證 之 取 捨 依 據 、 推 論 之 邏 輯 等 相 異 之 理 由 , 即 以 有 別 於 第 一 次 鑑 定 結 果 之 調 查 報 告 , 以 稿 代 簽 陳 核 函 送 桃 園 地 檢 署 , 此 有 該 署 督 察 科 八 十 九 年 十 月 十 七 日 內 部 查 核 簽 呈 在 卷 足 稽 。
( 2 ) 消 防 署 嗣 依 據 來 緯 公 司 同 年 九 月 十 日 陳 情 書 , 由 陳 前 署 長 弘 毅 指 示 黃 前 副 署 長 季 敏 率 同 施 教 授 多 喜 、 陳 教 授 金 蓮 、 消 防 署 、 台 北 市 政 府 消 防 局 ( 下 稱市消防 市 消 防 局 ) 、 縣 消 防 局 等 相 關 人 員 , 分 別 於 同 年 月 十 六 日 、 二 十 日 、 十 月 四 日 、 五 日 、 八 日 再 赴 現 場 勘 查 , 以 釐 清 該 公 司 所 提 疑 點 。 同 年 十 月 三 日 , 消 防 署 嗣 接 獲 地 檢 署 起訴書,乃於同年十一月三日以八十八消署調字第八八I○一五一號函復 訴 書 , 乃 於 同 年 十 一 月 三 日 以 八 十 八 消 署 調 字 第 八 八 I ○ 一 五 一 號 函 復 陳 情 人 略 以 : 「 為 求 慎 重 , 經 該 署 黃 前 副 署 長 率 相 關 機 關 人 員 及 專 家 學 者 分 別 進 行 五 次 現 場 履 勘 … … 迄 同 年 十 月 十 四 日 該 署 甫 接 獲 桃 園 地 院 針 對 該 案 之起 訴 書 , 由 於 全 案 已 進 入 司 法 程 序 , 建 請 來 緯 公 司 循 司 法 途 徑 辦 理 。 」 桃 園 地 院 承 審 法 官 黃 永 定 嗣 於 八 十 九 年 三 月 十 三 日 委 請 消 防 署 於 同 年 月 二 十 二 日 勘 驗
三 四 現 場 並 重 新 鑑 定 , 以 究 真 相 。 經 消 防 署 鑒 於 上 揭 二 份 鑑 定 報 告 缺 乏 交 集 , 經 排 除 縣 消 防 局 及 消 防 署 曾 參 與 勘 查 之 人 員 , 另 成 立 專 案 小 組 , 仍 由 施 教 授 多 喜 擔 任 召 集 人 , 並 邀 集 行 政 院 勞 工 委 員 會 等 相 關 機 關 薦 派 相 關 專 家 成 立 專 案 小 組 , 以 協 助 調 查 鑑 定 原 因 。 歷 經 八 十 九 年 四 月 間 之 數 次 現 場 勘 查 、 五 月 及 六 月 間 數 次 開 會 討 論 、 六 月 間 再 分 別 多 次 召 集 原 先 參 與 調 查 鑑 定 之 人 員 交 叉 討 論 等 過 程 , 因 與 會 人 員 各 持 不 同 看 法 , 未 獲 具 體 結 論 , 且 斯 時 因 立 法 委 員 函 該 部 張 前 部 長 博 雅 , 涉 有 對 專 案 小 組 召 集 人 施 教 授 多 喜 人 身 攻 擊 , 且 質 疑 專 案 小 組 之 公 正 、 客 觀 性 , 為 避 免 專 案 小 組 受 質 疑 , 小 組 成 員 認 為 對 現 場 勘 查 明 確 之 痕 跡 、 物 證 … … 等 已 相 當 明 確 客 觀 之 物 證 進 行 確 認 分 析 , 已 足 以 瞭 解 初 期 火 災 燃 燒 狀 況 及 位 置 , 乃 於 八 十 九 年 十 月 三 十 一 日 將 上 揭 相 關 資 料 以 消 署 調 字 第 八 九 一 一 六 七 九 號 函 送 桃 園 地 院 參 辦 。 該 院 嗣 再 函 請 消 防 署 於 九 十 年 八 月 二 十 四 日 、 十 二 月 二 十 五 日 派 員 至 現 場 履 勘 及 說 明 , 消 防 署 則 請 原 承 辦 人 員 出 席 。 至 台 灣 高 等 法 院 因 對 前 開 二 件 報 告 完 全 不 同 之 鑑 定 結 果 , 無 以 裁 量 , 乃 於 九 十 二 年 八 月 七 日 以 院 田 刑 忠 字 第 一 一 六 ○ 二 號 函 , 再 次 函 請 消 防 署 組 成 專 案 小 組 協 助 調 查 鑑 定 ; 經 消 防 署 召 開 九 十 二 年 間 方 成 立 之 火 災 鑑 定 委 員 會 審 閱 相 關 卷 證 資 料 , 並 開 會 討 論 後 , 認 本 案 所 提 供 法 院 參 酌 之 火 災 現 場 初 期 燃 燒 狀 況 錄 影 帶 、 現 場 痕 跡 、 物 證 、 消 防 搶 救 人 員 對 初 期 燃 燒 狀 況 之 談 話 筆 錄 等 資 料 均 已 非 常 明 確 , 加 以 現 場 相 關 跡 證 多 已 不 復 存 在 , 故 依 大 多 數 委 員 意 見 , 消 防 署 不 再 組 成 專 案
三 五
小 組 勘 驗 現 場 , 並 建 議 高 等 法 院 倘 仍 有 疑 義 , 傳 喚 原 調 查 鑑 定 人 員 到 庭 說 明 , 以 達 刑 事 訴 訟 法 交 互 詰 問 以 究 事 實 真 相 之 功 能 。
( 3 ) 消 防 署 於 本 院 約 詢 後 , 補 充 全 案 之 檢 討 說 明 略 以 :
< 1
案 內 曾 有 數 位 立 法 委 員 函 詢 、 電 洽 消 防 署 關 心 或 於 立 法 院 提 出 質 詢 , 消 防 署 均 表 達 會 以 公 正 、 公 平、專業之原則處理。 、 專 業 之 原 則 處 理 。
< 2
消 防 署 曾 派 員 會 同 桃 園 縣 警 察 局 消 防 隊 調 查 火 災 原 因 及 列 席 會 議 討 論 , 而 當 該 署 接 受 地 檢 署 委 託 時 , 對 該 消 防 隊 原 調 查 之 經 過 及 該 署 曾 派 員 參 與 調 查 情 形 , 均 未 併 案 說 明 , 僅 以 稿 代 簽 陳 閱 , 致 火 災 現 場 相 關 跡 證 之 說 明 情 形 無 從 比 較 , 且 消 防 署 當 時 參 與 桃 園 縣 火 災 鑑 定 委 員 會 議 時 , 對 現 場 所 表 示 之 不 同 意 見 , 未 見 分 析 說 明 。
< 3
受 委 託 重 新 調 查 火 災 原 因 時 , 應 與 原 調 查 機 關 人 員 討 論 , 確 認 後 應 予 分 析 並 與 原 調 查 報 告 併 案 說 明 , 避 免 因 距 火 災 發 生 之 時 日 久 遠 , 對 於 當 時 之 相 關 人 、 事 等 跡 證 不 明 瞭 而 有 誤 判 之 情 形 發 生 ; 且 對 於 火 災 案 件 之 原 因 分 析 , 應 以 嚴 謹 證 據 法 則 為 依 歸 , 以 現 場 所 發 現 之 跡 證 作 研 判 , 不 可 任 作 臆 測 。
( 二 ) 司 法 機 關 因 地 方 消 防 機 關 火 災 原 因 調 查 報 告 書 撰 寫 疏 漏 、 草 率 , 委 請 消 防 署 重 新 調 查 、 鑑 定 部 分 :
1 、 八 十 八 年 八 月 六 日 十 時 三 十 五 分 台 北 縣 樹 林 鎮 備 內 街 光 明 巷 一 之 九 號 及 十 一 號 住 宅 火 災 案 , 台 北 縣 消 防 局 撰 寫 之 火 災 原 因 調 查 報 告 書 存 有 缺 失 如 下 : 二 起火戶間 火 戶 間
三 六 之 延 燒 關 係 、 起火處之說明及採證照片,均不甚明確、未對關鑑之電源開關箱跳 火 處 之 說 明 及 採 證 照 片 , 均 不 甚 明 確 、 未 對 關 鑑 之 電 源 開 關 箱 跳 脫 情 形 、 電 源 線 迴 路 關 係 及 短 路 痕 電 源 線 特 寫 或 進 一 步 鑑 定 分 析 等 , 此 觀 之 消 防 署 九 十 一 年 五 月 二 十 四 日 消 署 調 字 第 九 一 ○ ○ ○ 七 ○ 一 七 號 函 自 明 。
2 、 八 十 九 年 四 月 十 九 日 彰 化 縣 北 斗 鎮 中 華 路 二 一 四 號 儷 之 舫 美 髮 店 火 災 案 , 彰 化 縣 消 防 局 撰 寫 之 火 災 原 因 調 查 報 告 書 存 有 缺 失 如 下 : 對 於 疑 似 縱 火 用 具 「 寶 特 瓶 」 上 之 潛 伏 指 紋 , 除 未 進 一 步 鑑 定 , 證 物 寶 特 瓶 亦 未 加 以 保 存 , 阻 礙 犯 罪 事 實 之 認 定 , 此 分 別 有 彰 化 地 方 法 院 九 十 年 十 一 月 二 十 七 日 彰 院 松 刑 末 九 十 訴 五 一 字 第 四 四 一 三 八 號 函 、 彰 化 縣 消 防 局 同 年 月 十 六 日 ( 九 十 ) 彰 調 字 第 ○ 七 三 五 四 號 函 及 消 防 署 同 年 十 二 月 六 日 內 部 簽 呈 在 卷 足 稽 。
3 、 九 十 一 年 七 月 二 十 八 日 四 時 五 分 彰 化 縣 花 壇 鄉 文 德 村 宏 宅 街 一 六 七 號 、 一 六 九 號 住 宅 火 災 案 , 彰 化 縣 消 防 局 撰 寫 之 火 災 原 因 調 查 報 告 書 存 有 缺 失 如 下 : 對 於 起火 火 處 位 置 及 高 度 , 未 切 實 詢 問 關 係 人 、 對 於 可 能 之 電 氣 因 素 未 具 體 分 析 、 起火原因 火 原 因 研 判 不 合 邏 輯 、 相 互 矛 盾 、 未 將 起火處之證物重建及復原,此有消防署九十二年 火 處 之 證 物 重 建 及 復 原 , 此 有 消 防 署 九 十 二 年 ○ 九 二 ○ ○ ○ ○ 八 三 六 函 在 卷 可 稽 。
4 、 九 十 一 年 八 月 一 日 十 六 時 十 六 分 嘉 義 市 竹 文 里 北 興 街 三 十 一 巷 十 三 號 等 四 棟 住 宅 戶 火 災 案 , 嘉 義 市 消 防 局 撰 寫 之 火 災 原 因 調 查 報 告 書 存 有 缺 失 如 下 : 未 分 析 起火 火 處 附 近 之 延 燒 關 係 、 未 檢 附 清 理 現 場 之 照 片 , 此 有 消 防 署 九 十 二 年 一 月 十 三 日 消 署 字 第 ○ 九 一 ○ ○ 二 一 八 一 六 號 函 在 卷 可 稽 。
三 七
5 、 九 十 一 年 十 月 三 十 日 台 中 縣 烏 日 鄉 九 德 村 中 山 路 一 段 四 六 二 號 住 宅 火 災 案 , 台 中 縣 消 防 局 撰 寫 之 火 災 原 因 調 查 報 告 書 存 有 缺 失 如 下 : 未 敘 明 清 理 起火處,以確認 火 處 , 以 確 認 現 場 有 否 遺 留 煙 頭 或 排 除 其 他 可 能 原 因 , 此 有 消 防 署 九 十 二 年 七 月 一 日 內 部 簽 呈 在 卷 足 稽 。
( 三 ) 本 案 相 關 調 查 案 件 調 查 所 得 發 現 之 缺 失 :
本 院 九 十 二 年 十 一 月 十 九 日 ( 九 二 ) 院 台 調 壹 字 第 ○ 九 二 ○ 八 ○ ○ 九 二 ○ 號 函 調 查 「 據 報 載 : 苗 栗 縣 通 宵 鎮 福 源 里 巨 豐 煙 火 製 造 股 份 有 限 公 司 工 廠 ( 下 禒 巨 豐 廠 ) 於 九 十 二 年 十 一 月 十 六 日 晚 間 驚 傳 爆 炸 , 造 成 六 人 死 亡 、 十 三 人 輕 重 傷 , 該 公 司 前 亦 曾 發 生 爆 炸 災 害 , 涉 有 危 害 公 共 安 全 之 情 節 重 大 , 相 關 業 務 主 管 機 關 有 無 違 失 ? 認 有 調 查 之 必 要 。 」 乙 案 , 發 現 缺 失 略 以 : 一 、 苗 栗 縣 消 防 局 、 消 防 署 及 勞 委 會 中 區 勞 動 檢 查 所 就 巨 豐 廠 爆 炸 原 因 之 事 證 研 判 、 推 論 依 據 及 鑑 定 結 果 顯 欠 一 致 , 足 見 國 内 工 作 場 所 爆 炸 災 害 原 因 鑑 定 機 制 尚 欠 健 全 … … 二 、 苗 栗 縣 消 防 局 疏 於 執 行 相 關 規 定 , 致 巨 豐 廠 火 災 之 鑑 定 作 業 及 調 查 報 告 書 之 撰 寫 , 失 之 草 率 , 核 有 未 當 … … ( 詳 本 院 九 十 三 年 七 月 十 五 日 【 九 三 】 院 台 內 字 第 ○ 九 三 一 九 ○ ○ 四 ○ 七 號 公 告 之 糾 正 案 文 ) 。
五 、 民 眾 針 對 火 災 調 查 鑑 定 業 務 滿 意 度 之 調 查 統 計 情 形 :
( 一 ) 消 防 署 之 說 明 :
因 火 災 案 件 涉 及 刑 法 上 之 公 共 危 險 罪 , 屬 公 訴 罪 , 有 關 火 災 原 因 調 查 、 鑑 定 業
三 八 務 , 並 非 一 般 為 民 服 務 類 , 故 消 防 署 並 未 對 是 項 工 作 進 行 滿 意 度 調 查 , 但 依 消 防 署 九 十 二 年 行 政 革 新 問 卷 案 件 調 查 , 約 有 七 成 五 以 上 之 民 眾 對 消 防 機 關 為 民 服 務 之 工 作 表 示 滿 意 或 尚 可 。
( 二 ) 地 方 消 防 機 關 之 綜 合 說 明 :
1 、 台 東 縣 消 防 局 之 說 明 :
( 1 ) 火 災 鑑 定 時 效 : 五 八 ‧ 二 五 % 受 訪 民 眾 認 為 應 提 昇 服 務 品 質 。
( 2 ) 火 災 證 明 核 發 : 一 ○ % 受 訪 民 眾 認 為 應 提 昇 服 務 品 質 。
( 3 ) 鑑 識 人 員 之 清 廉 : 一 ○ ‧ 七 五 % 受 訪 民 眾 認 為 應 提 昇 服 務 品 質 。
( 4 ) 認 為 火 災 調 查 課 辦 事 效 率 較 好 僅 占 六 ‧ 二 五 % , 遠 低 於 災 害 搶 救 課 三 四 ‧ 七 五 % 、 災 害 預 防 課 之 三 三 ‧ 五 % 、 救 災 救 護 指 揮 中 心 三 ○ % 、 災 害 管 理 課 之 九 ‧ 七 五 % 。
2 、 雲 林 縣 消 防 局 之 說 明 :
絕 大 多 數 民 眾 均 對 火 災 調 查 人 員 均 抱 持 感 念 之 態 度 。
3 、 彰 化 縣 消 防 局 之 說 明 :
轄 內 民 眾 對 於 對 於 消 防 局 災 後 鑑 定 不 滿 者 占 八 ‧ 五 % 。
六 、 相 關 機 關 針 對 民 眾 申 請 參 閱 火 災 原 因 調 查 報 告 書 及 消 防 機 關 針 對 火 災 案 件 當 事 人 就 火 災 原 因 鑑 定 結 果 質 疑 或 不 滿 意 之 處 理 機 制 :
( 一 ) 司 法 院 針 對 公 共 安 全 界 參 與 司 法 改 革 座 談 會 建 議 事 項 辦 理 情 形 表 之 內 容 載 明 略 以 :
三 九
1 、 建 議 法 院 審 理 公 共 安 全 事 件 時 , 除 善 用 起火或受災建物內部所設之警報偵測記錄 火 或 受 災 建 物 內 部 所 設 之 警 報 偵 測 記 錄 系 統 , 據 以 了 解 推 論 災 害 發 生 及 蔓 延 擴 大 之 過 程 , 釐 清 依 法 應 執 行 之 安 全 政 策 或 人 員 之 責 任 所 在 之 外 , 並 可 善 用 保 險 評 估 檢 查 人 員 之 專 業 知 識 協 助 事 務 之 調 查 , 可 不 受 限 於 由 公 務 機 關 或 公 會 推 派 , 外 商 公 司 人 員 亦 可 徵 用 乙 節 :
經 司 法 院 民 事 廳 、 刑 事 廳 、 行 政 訴 訟 及 懲 戒 廳 研 議 說 明 如 下 : 依 刑 事 訴 訟 法 第 一 百 九 十 八 條 規 定 , 就 鑑 定 事 項 有 特 別 知 識 經 驗 者 , 即 得 充 任 鑑 定 人 , 並 不 限 公 務 機 關 或 公 會 推 派 者 , 至 其 選 任 , 屬 承 辦 法 官 職 權 , 宜 由 法 官 依 個 案 審 酌 。 有 關 法 院 審 理 公 共 安 全 事 件 時 , 可 否 委 請 「 保 險 評 估 檢 查 人 員 」 或 「 外 商 公 司 人 員 」 協 助 案 件 調 查 一 節 , 按 現 行 行 政 訴 訟 法 第 一 百 三 十 八 條 : 「 行 政 法 院 得 囑 託 普 通 法 院 或 其 他 機 關 、 學 校 、 團 體 調 查 證 據 。 」 第 一 百 五 十 七 條 : 「 從 事 於 鑑 定 所 需 之 學 術 、 技 藝 或 職 業 , 或 經 機 關 委 任 有 鑑 定 職 務 者 , 於 他 人 之 行 政 訴 訟 有 為 鑑 定 人 之 義 務 。 」 及 第 一 百 六 十 二 條 : 「 行 政 法 院 認 有 必 要 時 , 得 就 訴 訟 事 件 之 專 業 法 律 問 題 徵 詢 從 事 該 學 術 研 究 之 人 , 以 書 面 或 於 審 判 期 日 到 場 陳 述 其 法 律 上 意 見 … … 」 業 就 法 院 得 委 請 專 業 人 員 協 助 案 件 調 查 定 有 明 文 。 是 本 項 建 議 , 現 行 法 制 已 有 規 定 。
2 、 建 議 案 件 關 係 人 於 判 決 前 能 瞭 解 消 防 機 關 火 災 調 查 報 告 之 內 容 , 而 能 適 時 委 託 公 正 人 士 提 出 辯 護 乙 節 :
經 司 法 院 民 事 廳 、 刑 事 廳 、 行 政 訴 訟 及 懲 戒 廳 研 議 表 示 , 民 事 事 件 當 事 人 得
四 ○ 聲 請 閱 卷 瞭 解 調 查 報 告 內 容 , 於 言 詞 辯 論 中 法 官 亦 會 提 示 調 查 報 告 , 當 事 人 更 可 事 先 聲 請 法 院 於 調 查 報 告 函 復 法 院 後 通 知 當 事 人 閱 卷 。 依 現 行 刑 事 訴 訟 法 第 三 十 三 條 、 第 三 十 八 條 規 定 , 辯 護 人 、 被 告 或 自 訴 人 之 代 理 人 於 審 判 中 得 檢 閱 卷 宗 及 證 物 , 並 得 抄 錄 或 攝 影 , 至 其 他 案 件 關 係 人 並 非 當 事 人 , 自 無 辯 護 必 要 , 且 給 閱 卷 內 資 料 亦 於 法 無 據 。 有 關 行 政 訴 訟 事 件 關 係 人 利 用 訴 訟 文 書 , 係 依 行 政 訴 訟 法 第 九 十 六 條 : 「 當 事 人 得 向 行 政 法 院 書 記 官 請 求 閱 覽 、 抄 錄 、 影 印 或 攝 影 卷 內 文 書 , 或 預 納 費 用 請 求 付 與 繕 本 、 影 本 或 節 本 ( 第 一 項 ) 。 第 三 人 經 當 事 人 同 意 或 釋 明 有 法 律 上 之 利 害 關 係 , 經 行 政 法 院 院 長 許 可 者 , 亦 得 為 前 項 之 請 求 ( 第 二 項 ) 。 」 規 定 辦 理 。 是 本 項 建 請 公 安 事 件 關 係 人 於 判 決 前 瞭 解 消 防 機 關 之 火 災 原 因 調 查 報 告 一 節 , 得 依 上 開 規 定 辦 理 。
3 、 建 議 火 災 調 查 報 告 書 事 後 可 供 學 術 單 位 查 閱 研 究 乙 節 :
司 法 院 民 事 廳 、 刑 事 廳 、 行 政 訴 訟 及 懲 戒 廳 研 議 表 示 , 案 卷 內 容 依 法 只 有 當 事 人 或 利 害 關 係 人 可 以 查 閱 , 學 術 單 位 如 有 查 閱 火 災 調 查 報 告 之 必 要 , 宜 洽 當 事 人 或 向 鑑 定 機 關 索 閱 。
( 二 ) 法 務 部 之 說 明 :
1 、 台 北 市 議 員 林 晉 章 研 究 室 針 對 「 茲 為 有 涉 責 任 分 析 之 交 通 肇 事 責 任 分 析 表 可 提 供 當 事 人 參 考 , 無 涉 責 任 分 析 之 火 災 原 因 調 查 報 告 書 卻 不 提 供 當 事 人 參 考 」 乙 案 , 於 九 十 三 年 二 月 九 日 以 ( 九 三 ) 晉 服 字 第 ○ 七 四 號 函 請 內 政 部 轉 請 法 務 部 釋 示 , 該
四 一
函 內 容 略 以 : 「 … … 目 前 凡 有 車 禍發生 發 生 , 肇 事 雙 方 當 事 人 皆 可 向 交 通 大 隊 申 請 交 通 肇 事 責 任 分 析 表 , 此 分 析 表 提 供 肇 事 原 因 之 鑑 定 以 及 責 任 之 分 析 ; 而 若 為 火 災 之 受 災 戶 或 致 縱 火 、 失 火 之 嫌 疑 人 , 消 防 機 關 卻 不 提 供 火 災 原 因 調 查 報 告 書 予 當 事 人 參 考 。 然 火 災 原 因 調 查 報 告 書 為 單 純 之 原 因 鑑 定 報 告 , 並 不 影 響 刑 事 證 據 之 偵 蒐 、 保 全 , 自 應 無 悖 刑 法 第 二 百 四 十 五 條 偵 查 不 公 開 原 則 , 當 然 亦 不 足 以 妨 礙 被 告 受 公 正 之 裁 判 ; 且 此 原 因 調 查 報 告 書 與 交 通 肇 事 責 任 分 析 表 不 同 , 交 通 肇 事 責 任 分 析 表 含 有 當 事 人 雙 方 之 責 任 鑑 定 , 即 使 在 車 禍事故中有致人死傷,涉及刑法 事 故 中 有 致 人 死 傷 , 涉 及 刑 法 上 之 殺 人 罪 或 傷 害 罪 , 交 通 大 隊 仍 提 供 雙 方 當 事 人 以 為 責 任 釐 清 之 參 考 。 相 對 而 言 , 火 災 原 因 調 查 報 告 書 卻 無 涉 責 任 之 分 析 、 判 斷 , 自 應 更 無 不 提 供 當 事 人 參 考 之 理 … … 」 嗣 經 法 務 部 於 同 年 三 月 十 七 日 以 法 檢 字 第 ○ 九 三 ○ ○ ○ 八 ○ 六 九 號 函 釋 略 以 : 「 火 災 原 因 調 查 報 告 書 於 進 入 刑 事 偵 查 階 段 , 係 追 訴 失 火 罪 或 縱 火 罪 的 重 要 證 據 資 料 , 二 罪 均 屬 嚴 重 侵 害 社 會 法 益 之 犯 罪 。 且 因 火 災 現 場 跡 證 , 在 偵 查 程 序 完 成 前 仍 有 保 全 之 必 要 , 亦 與 交 通 車 禍案件單純在確定二造間為責任認定並不 案 件 單 純 在 確 定 二 造 間 為 責 任 認 定 並 不 相 同 , 火 災 原 因 調 查 報 告 書 與 交 通 肇 事 責 任 分 析 表 在 性 質 與 作 用 上 均 不 相 同 , 前 者 並 不 適 於 比 照 後 者 在 偵 查 中 任 意 公 開 。 」
( 三 ) 消 防 機 關 之 說 明 :
1 、 消 防 署 之 說 明 :
( 1 ) 火 災 案 件 完 成 偵 查 程 序 後 , 民 眾 如 對 火 災 調 查 、 鑑 定 內 容 有 所 質 疑 或 不 滿 意 時 ,
四 二 可 循 刑 法 、 刑 事 訴 訟 法 規 定 之 司 法 途 徑 , 提 出 對 自 身 有 利 之 證 據 , 並 請 求 法 官 或 檢 察 官 裁 定 再 次 調 查 、 鑑 定 。
( 2 ) 關 於 「 交 通 事 故 鑑 定 結 果 如 當 事 人 不 服 者 , 可 提 縣 市 政 府 行 車 事 故 鑑 定 委 員 會 裁 決 。 則 火 災 鑑 定 結 果 如 當 事 人 不 服 者 , 可 否 研 議 由 縣 市 政 府 火 災 鑑 定 委 員 會 處 理 」 乙 節 :
經 查 交 通 事 故 現 場 處 理 並 不 涉 及 原 因 之 研 判 , 且 屬 民 事 責 任 與 責 任 比 例 分 擔 之 問 題 , 其 侵 害 為 個 人 法 益 , 而 當 事 人 如 不 服 責 任 分 擔 比 例 之 裁 決 結 果 時 , 可 提 市 縣 政 府 行 車 事 故 鑑 定 委 員 會 討 論 裁 決 。 而 火 災 案 件 係 涉 危 害 社 會 法 益 , 在 刑 法 上 , 不 論 故 意 或 過 失 , 均 屬 涉 公 共 危 險 之 公 訴 罪 , 是 依 法 理 而 言 , 火 災 案 件 之 性 質 與 侵 害 個 人 法 益 之 交 通 事 故 不 同 , 而 火 災 案 件 當 事 人 不 服 火 災 調 查 結 果 時 , 因 火 災 現 場 相 關 痕 跡 、 跡 證 均 已 清 理 , 無 法 由 市 縣 政 府 火 災 鑑 定 委 員 會 再 單 獨 處 理 火 災 案 件 之 調 查 、 鑑 定 , 故 對 於 侵 害 社 會 法 益 之 火 災 案 件 , 應 循 司 法 途 徑 處 理 為 宜 。
2 、 台 北 市 消 防 局 之 說 明 :
火 災 案 件 涉 刑 法 第 一 百 七 十 三 條 至 第 一 百 七 十 五 條 之 公 共 危 險 罪 , 消 防 機 關 非 具 司 法 警 察 身 份 , 所 作 之 各 項 調 查 、 鑑 定 係 作 為 消 防 行 政 管 理 之 策 進 及 改 進 作 為 , 而 移 送 警 察 機 關 之 火 災 原 因 調 查 報 告 書 , 僅 係 消 防 單 位 依 據 現 場 燃 燒 後 狀 況 、 跡 證 及 訪 談 關 係 人 之 結 果 , 綜 合 研 判 貣 火 原 因 所 撰 寫 而 成 , 檢 警 人 員 自 應 主 動 參
四 三
與 調 查 , 而 非 將 該 調 查 報 告 書 作 為 貣 訴 之 主 要 證 據 。
3 、 彰 化 縣 消 防 局 之 說 明 :
應 釐 清 行 政 調 查 與 司 法 調 查 權 限 之 關 係 : 政 府 各 機 關 各 有 其 專 業 、 權 限 、 功 能 與 目 的 , 而 消 防 機 關 火 災 原 因 調 查 之 結 果 , 係 提 供 火 災 預 防 管 理 及 行 政 措 施 之 參 考 , 與 司 法 調 查 ( 火 災 案 涉 及 刑 法 上 之 公 共 危 險 罪 ) 之 刑 事 偵 查 工 作 , 是 追 究 火 災 責 任 之 參 考 不 同 , 彼 此 業 務 權 責 應 能 確 認 。
4 、 台 東 縣 消 防 局 之 說 明 :
火 災 原 因 調 查 工 作 若 屬 行 政 調 查 , 則 必 須 向 當 事 人 公 開 調 查 結 果 , 但 遇 有 糾 紛 案 件 若 將 報 告 書 及 貣 火 原 因 公 開 會 造 成 多 項 困 擾 。
5 、 其 他 地 方 消 防 機 關 之 綜 合 說 明 :
( 1 ) 消 防 機 關 進 行 火 災 現 場 調 查 時 , 均 要 求 關 係 人 於 現 場 會 同 調 查 , 各 關 係 人 如 於 現 場 有 意 見 或 對 起火處、起火原因有不同見解時,均可立即提出,調查人員將 火 原 因 有 不 同 見 解 時 , 均 可 立 即 提 出 , 調 查 人 員 將 審 慎 考 量 與 釐 清 , 以 綜 合 研 判 起火原因。 火 原 因 。
( 2 ) 倘 相 關 當 事 人 及 關 係 人 仍 有 疑 問 , 亦 可 在 檢 察 官 偵 辦 或 法 院 審 判 時 , 要 求 證 據 調 查 或 要 求 其 他 單 位 鑑 定 , 以 維 護 權 益 。
七 、 國 內 現 行 火 災 原 因 調 查 、 鑑 定 制 度 之 檢 討 及 興 革 情 形 :
( 一 ) 消 防 署 之 說 明 :
1 、 按 消 防 署 九 十 二 年 十 二 月 十 六 日 消 署 調 字 第 ○ 九 二 ○ 九 ○ ○ 三 四 三 號 函 發 布 之
四 四 「 火 災 調 查 業 務 人 力 不 足 分 析 報 告 及 因 應 措 施 」 貳 、 現 況 分 析 載 明 略 為 : 「 經 初 步 統 計 , 目 前 各 警 察 機 關 現 有 鑑 識 人 員 為 二 八 一 人 , 除 台 北 市 、 高 雄 市 已 成 立 鑑 識 中 心 外 , 其 他 縣 ( 市 ) 政 府 並 已 提 昇 現 有 編 組 , 陸 續 規 劃 成 立 鑑 識 中 心 ( 課 ) , 鑑 識 人 力 勢 再 擴 充 一 倍 ; 反 觀 各 消 防 機 關 現 有 火 災 調 查 人 員 僅 一 四 七 人 , 且 部 分 縣 市 消 防 局 火 災 調 查 人 員 尚 須 兼 辦 其 他 業 務 , 而 每 年 需 處 理 之 火 災 案 件 數 則 達 一 萬 三 千 件 以 上 , 為 刑 事 鑑 定 案 件 數 十 倍 以 上 , 加 以 火 災 現 場 之 範 圍 廣 闊 , 均 遠 大 於 刑 案 現 場 … … 經 對 火 災 調 查 業 務 現 況 之 詳 加 分 析 , 並 蒐 集 、 分 析 美 、 日 等 國 家 火 災 原 因 調 查 情 形 , 建 議 每 件 火 災 案 件 調 查 鑑 定 人 力 至 少 為 七 人 , 即 現 場 調 查 指 揮 官 一 人 、 挖 掘 人 員 二 人 至 三 人 、 現 場 關 係 人 訪 查 、 詢 問 及 筆 錄 製 作 人 員 二 人 、 照 相 及 錄 影 人 員 各 一 人 、 測 繪 製 圖 人 員 一 人 、 火 場 證 物 實 驗 分 析 人 員 一 人 至 二 人 。 」
2 、 消 防 機 關 係 屬 行 政 機 關 , 火 災 調 查 人 員 並 不 具 有 司 法 警 察 權 , 在 執 行 火 災 原 因 調 查 鑑 定 時 , 為 製 作 關 係 人 之 談 話 筆 錄 以 釐 清 火 災 原 因 時 , 如 遇 關 係 人 不 配 合 , 火 災 調 查 人 員 並 無 強 制 力 ; 另 轄 區 警 察 機 關 常 在 收 到 火 災 原 因 調 查 報 告 書 後 , 方 行 偵 辦 , 往 往 已 失 時 效 性 , 延 誤 破 案 時 機 。
( 二 ) 中 央 警 察 大 學 之 說 明 :
因 消 防 人 員 不 具 司 法 警 察 人 員 身 分 , 為 因 應 日 益 增 多 之 縱 火 案 件 , 有 必 要 針 對 此 部 分 加 強 因 應 , 其 方 式 諸 如 加 強 與 警 察 機 關 之 配 合 , 希 望 警 察 機 關 亦 能 如 美 國 、 日 本 等 國 家 之 警 察 一 樣 , 辦 理 火 災 現 場 之 勘 查 與 鑑 定 工 作 , 如 此 在 火 災 公 共 危 險 罪
四 五
追 訴 上 較 易 爭 取 時 效 , 對 相 關 之 縱 火 案 件 亦 可 得 嚇 阻 之 效 果 ; 如 警 察 機 關 不 克 從 事 此 方 面 之 工 作 , 可 否 修 法 賦 予 消 防 機 關 火 災 調 查 人 員 司 法 警 察 之 權 限 ?
( 三 ) 地 方 消 防 機 關 之 綜 合 檢 討 說 明 :
1 、 基 隆 市 、 苗 栗 縣 、 南 投 縣 、 宜 蘭 縣 、 彰 化 縣 、 嘉 義 縣 、 花 蓮 縣 、 屏 東 縣 、 澎 湖 縣 等 消 防 局 均 表 示 : 「 火 災 調 查 鑑 定 人 力 嚴 重 不 足 , 應 予 增 補 。 」 基 隆 市 、 宜 蘭 縣 、 嘉 義 縣 消 防 局 則 說 明 : 「 經 費 不 足 , 致 火 災 調 查 鑑 定 設 備 不 符 需 求 。 」
2 、 台 中 縣 、 嘉 義 市 等 消 防 局 之 說 明 :
( 1 ) 因 火 災 案 件 事 涉 刑 法 公 共 危 險 罪 , 司 法 機 關 於 審 理 階 段 可 能 需 要 再 履 勘 現 場 , 故 消 防 機 關 及 警 察 機 關 不 敢 專 擅 准 予 災 戶 開 放 火 場 清 理 重 建 , 惟 一 般 受 災 戶 卻 急 於 清 理 火 場 重 建 家 園 , 致 生 災 戶 陳 情 、 民 意 代 表 關 切 不 斷 。 故 上 揭 何 機 關 於 何 時 , 得 准 予 災 戶 開 放 火 場 之 問 題 , 實 有 探 討 、 明 定 之 必 要 , 以 符 實 務 需 求 。
( 2 ) 目 前 國 內 現 行 火 災 原 因 調 查 制 度 中 , 關 於 火 災 現 場 封 鎖 ( 設 置 警 戒 繩 ) 之 一 環 大 部 分 由 消 防 單 位 執 行 , 但 其 撤 除 封 鎖 時 機 為 檢 察 官 之 職 權 , 民 眾 仍 需 向 警 政 單 位 聲 請 , 消 防 單 位 並 無 撤 銷 之 權 限 , 在 實 務 中 常 有 民 眾 要 求 消 防 機 關 撤 銷 封 鎖 , 以 便 清 理 火 災 現 場 , 更 甚 者 , 有 請 民 意 代 表 施 壓 , 致 消 防 機 關 不 堪 其 擾 。
3 、 台 中 市 、 嘉 義 縣 、 台 南 縣 、 屏 東 縣 等 消 防 局 之 說 明 :
( 1 ) 建 議 消 防 署 增 設 中 部 與 南 部 鑑 定 實 驗 室 , 並 進 用 具 理 化 專 業 之 人 員 , 以 縮 短 各 縣 市 消 防 局 檢 送 火 災 現 場 證 物 鑑 定 所 需 往 返 時 間 , 除 可 分 攤 現 行 中 央 鑑 定 實 驗
四 六 室 人 手 不 足 窘 境 , 亦 可 因 應 刑 事 訴 訟 法 新 制 │ 「 交 互 詰 問 制 度 」 之 實 施 。
( 2 ) 目 前 消 防 署 中 央 鑑 定 實 驗 室 僅 有 二 名 火 災 證 物 鑑 定 人 員 , 無 法 鑑 定 大 量 來 自 全 國 各 縣 市 消 防 局 所 委 託 送 驗 之 火 災 證 物 , 往 往 於 火 災 後 二 、 三 個 星 期 方 得 知 結 果 , 建 請 消 防 署 增 加 火 災 證 物 鑑 定 人 員 或 成 立 火 災 鑑 識 中 心 , 除 負 責 鑑 定 各 縣 市 送 請 化 驗 之 證 物 及 技 術 支 援 各 縣 市 之 申 請 案 件 , 亦 兼 具 教 育 研 究 發 展 之 功 能 , 如 此 必 可 全 面 提 昇 火 災 鑑 識 能 力 與 預 防 功 效 。
八 、 專 家 學 者 及 相 關 參 考 文 獻 於 火 災 調 查 鑑 定 領 域 之 研 究 成 果 及 論 述 意 見 :
經 本 院 自 九 十 三 年 七 月 至 十 月 間 , 持 續 蒐 集 火 災 調 查 鑑 定 領 域 之 相 關 學 術 著 作 、 政 府 出 版 品 、 研 究 報 告 及 先 進 國 家 火 災 調 查 運 作 制 度 等 相 關 文 獻 資 料 , 茲 將 上 開 各 文 獻 相 關 研 究 成 果 及 論 述 意 見 ( 詳 附 件 一 ) 之 重 點 , 分 述 如 下 :
( 一 ) 為 提 昇 消 防 機 關 火 災 證 物 鑑 定 技 術 之 公 信 力 , 消 防 署 除 應 具 體 要 求 各 消 防 機 關 從 事 火 災 調 查 鑑 定 之 人 員 隨 時 學 習 國 際 間 火 災 現 場 調 查 採 證 之 新 興 技 術 之 外 , 相 關 鑑 定 實 驗 室 之 設 備 、 鑑 定 能 力 應 儘 早 通 過 國 際 認 證 。
( 二 ) 火 災 調 查 鑑 定 工 作 第 一 要 務 即 是 發 現 火 災 原 因 , 而 國 內 近 十 幾 年 來 , 火 災 原 因 皆 以 電 氣 因 素 高 居 各 類 原 因 之 首 , 故 對 電 氣 火 災 鑑 定 新 技 術 的 嘗 詴 、 研 發 及 創 新 , 除 有 助 於 鑑 定 品 質 的 提 昇 之 外 , 亦 可 作 為 電 氣 火 災 預 防 管 理 之 參 考 。
( 三 ) 經 彙 整 相 關 人 員 歷 屆 「 國 際 縱 火 年 會 」 之 觀 摩 及 參 與 心 得 , 各 國 之 火 災 調 查 鑑 定 制 度 、 觀 念 制 度 , 足 資 我 國 火 災 調 查 鑑 定 工 作 之 參 考 如 下 : 「 瞭 解 火 流 勘 察 要 領 之 重
四 七
點 , 在 於 研 判 可 燃 物 、 引 火 源 及 延 燒 過 程 等 三 項 決 定 性 因 素 」 、 「 應 訂 定 各 禑 標 準 作 業 手 冊 」 、 「 建 立 專 業 證 照 制 度 」 、 「 開 放 民 間 調 查 鑑 定 公 司 參 與 實 務 鑑 定 , 藉 彼 此 良 性 競 爭 提 高 鑑 定 品 質 。 」 、 「 培 訓 縱 火 犬 」 、 「 增 進 國 際 間 火 災 調 查 人 員 之 交 流 」 、 「 爭 取 加 入 消 防 國 際 組 織 」 、 「 火 災 調 查 人 員 應 廣 納 新 知 , 加 強 教 育 訓 練 。 」
( 四 ) 藉 由 火 災 案 例 的 調 查 分 析 , 可 歸 納 出 相 關 火 災 危 險 要 因 , 進 而 嘗 詴 引 用 數 理 和 統 計 的 方 法 , 瞭 解 火 勢 延 燒 擴 大 的 現 象 , 構 建 火 災 災 例 分 析 模 式 , 並 藉 由 專 家 及 系 統 工 具 的 輔 助 , 將 完 整 的 火 災 災 例 分 析 模 式 , 利 用 電 腦 專 業 系 統 的 推 論 及 分 析 功 能 , 大 幅 提 昇 火 災 調 查 的 能 力 及 效 率 。
( 五 ) 台 灣 地 區 火 災 是 所 有 災 害 中 , 對 人 民 生 命 財 產 損 失 最 嚴 重 者 , 而 據 相 關 調 查 資 料 顯 示 , 六 十 % 、 七 十 % 以 上 的 火 災 , 是 發 生 於 老 舊 住 宅 建 築 物 。 因 此 , 消 防 機 關 宜 透 過 系 統 性 的 調 查 研 究 , 研 擬 如 何 在 現 有 法 令 機 制 所 不 能 限 制 , 或 都 市 更 新 計 晝 尚 未 設 計 , 或 尚 未 改 建 之 老 舊 眷 村 、 國 宅 社 區 , 或 早 期 發 展 但 尚 未 列 入 古 蹟 管 制 之 老 街 … 等 在 短 時 間 裡 無 法 改 善 其 現 狀 之 建 築 物 , 提 供 火 災 防 制 因 應 對 策 , 以 降 低 老 舊 社 區 住 宅 火 災 發 生 頻 率 。
( 六 ) 住 宅 火 災 傷 亡 人 數 遲 未 見 降 低 , 尤 其 是 老 舊 住 宅 社 區 , 原 因 除 火 災 危 險 因 子 未 見 改 善 外 , 民 眾 避 難 逃 生 知 識 之 不 足 , 以 及 初 期 火 災 滅 火 設 備 之 缺 乏 設 置 , 亦 為 一 大 主 因 。 雖 然 , 內 政 部 已 頒 布 「 舊 有 建 築 物 防 火 避 難 設 施 及 消 防 安 全 設 備 改 善 辦 法 」 據 以 改 善 舊 有 建 築 物 之 防 火 措 施 , 但 其 內 容 僅 限 於 供 公 眾 使 用 建 築 物 之 範 圍 , 對 於 實
四 八 施 都 市 計 畫 地 區 五 層 樓 以 下 或 非 實 施 都 市 計 畫 地 區 四 層 樓 以 下 之 樓 地 板 面 積 , 未 達 一 千 帄 方 公 尺 以 上 之 集 合 住 宅 ( 公 寓 ) 並 未 納 入 ; 而 所 訂 定 之 改 善 辦 法 亦 因 避 免 民 怨 , 一 直 無 法 有 效 改 善 , 大 多 數 的 縣 市 政 府 甚 至 尚 未 訂 定 相 關 分 期 分 區 之 執 行 計 畫 。
( 七 ) 火 災 原 因 調 查 之 意 義 , 除 提 供 司 法 機 關 參 考 , 以 確 定 刑 事 、 民 事 責 任 之 外 , 其 積 極 正 面 之 意 義 , 乃 在 提 供 「 預 防 行 政 」 之 參 考 ; 換 言 之 , 火 災 調 查 之 積 極 意 義 係 「 如 何 預 防 火 災 發 生 , 以 減 少 民 眾 生 命 財 產 之 損 失 。 」 時 下 科 技 日 新 月 異 , 為 能 提 供 「 預 防 行 政 」 之 參 考 , 火 災 原 因 調 查 , 除 力 求 火 災 原 因 、 案 件 資 料 之 健 全 外 , 最 重 要 者 , 在 於 資 料 之 善 加 統 計 及 分 析 , 其 除 有 助 於 消 防 政 策 之 確 立 與 描 繪 未 來 藍 圖 之 外 , 亦 使 消 防 政 策 與 制 度 更 符 合 未 來 社 會 之 需 要 , 確 實 達 「 預 防 火 災 」 之 功 效 。 為 求 正 確 統 計 、 分 析 火 災 原 因 與 火 災 案 件 相 關 資 料 , 資 料 建 立 務 須 即 時 、 詳 實 , 以 免 造 成 「 毒 果 樹 」 而 導 致 錯 誤 之 結 果 。 當 長 期 累 積 、 記 載 火 災 原 因 及 相 關 資 料 後 , 應 進 行 統 計 、 分 析 , 據 以 發 現 未 來 火 災 之 趨 勢 與 其 可 能 造 成 之 危 害 , 實 施 相 關 的 預 防 對 策 , 有 效 防 止 未 來 火 災 案 件 之 發 生 , 而 達 成 火 災 原 因 調 查 積 極 、 正 面 之 意 義 。 為 因 應 未 來 趨 勢 所 需 , 傳 統 之 火 災 紀 錄 固 然 具 有 記 載 、 描 述 火 災 之 功 用 , 但 於 分 析 未 來 火 災 趨 勢 上 , 其 效 果 則 尚 顯 不 足 , 所 以 為 彌 補 傳 統 之 火 災 紀 錄 , 則 應 藉 電 腦 進 行 記 載 、 統 計 及 分 析 , 方 符 合 未 來 火 災 預 防 行 政 之 所 需 。
( 八 ) 近 年 來 , 我 國 縱 火 犯 罪 問 題 有 日 益 嚴 重 之 趨 勢 , 除 凸 顯 民 眾 居 家 安 全 日 益 遭 受 嚴 重 威 脅 外 , 亦 造 成 火 災 保 險 業 者 蒙 受 嚴 重 的 損 失 , 首 先 除 應 針 對 火 災 保 險 業 對 圖 利 型
四 九
縱 火 犯 罪 防 制 之 問 題 , 針 對 核 保 、 查 勘 及 理 賠 作 業 提 出 防 制 策 略 , 並 應 建 立 保 險 公 司 與 消 防 、 警 察 、 檢 察 機 關 之 聯 合 防 制 機 制 , 其 應 包 的 內 容 如 : 一 、 建 立 跨 部 會 之 圖 利 型 縱 火 犯 罪 聯 合 防 制 機 制 , 並 成 立 專 責 單 位 負 責 圖 利 型 縱 火 犯 罪 之 防 制 工 作 。 二 、 建 構 保 險 業 與 檢 警 消 等 相 關 機 關 之 通 報 制 度 及 相 關 資 料 庫 連 結 措 施 , 共 同 防 制 圖 利 型 縱 火 犯 罪 。 三 、 加 強 教 育 及 媒 體 宣 傳 , 換 醒 大 眾 共 同 防 制 圖 利 型 縱 火 犯 罪 … … 。
( 九 ) 縱 火 案 件 宛 如 不 定 時 炸 彈 , 具 備 結 果 之 不 確 定 性 、 過 程 動 態 與 持 續 等 犯 罪 特 性 。 在 治 標 方 面 , 對 於 縱 火 者 應 迅 速 偵 破 並 嚴 懲 或 與 社 會 隔 離 , 以 收 嚇 阻 作 用 ; 對 於 身 心 障 礙 、 行 為 偏 差 者 , 相 關 醫 療 院 所 、 矯 正 機 構 應 積 極 輔 導 或 收 容 管 理 。 在 治 本 方 面 , 加 強 全 民 防 火 及 安 全 危 機 管 理 與 預 防 作 為 , 能 於 縱 火 災 害 發 生 時 及 時 避 難 逃 生 , 維 護 生 命 安 全 。 因 此 , 藉 由 政 府 相 關 單 位 的 積 極 防 制 搶 救 作 為 及 提 醒 民 眾 自 我 安 全 的 保 護 , 可 降 低 縱 火 案 件 的 損 失 及 傷 亡 。
( 十 ) 根 據 統 計 , 世 界 二 十 二 個 主 要 都 市 , 就 有 十 五 個 國 家 , 縱 火 為 其 火 災 案 件 主 要 貣 火 原 因 之 第 一 位 。 縱 火 犯 罪 儼 然 已 成 為 世 界 性 共 同 的 嚴 重 問 題 。 犯 罪 現 象 的 研 究 , 過 去 研 究 者 常 以 統 計 點 或 區 域 抽 樣 問 卷 方 式 , 從 中 暸 解 犯 罪 現 象 , 並 解 釋 犯 罪 行 為 。 然 而 , 研 究 犯 罪 現 象 的 最 直 接 方 式 , 對 犯 罪 者 訪 談 、 觀 察 , 從 犯 罪 心 理 角 度 透 視 其 行 為 潛 在 動 機 及 發 展 過 程 , 卻 甚 少 被 應 用 。 研 究 犯 罪 行 為 及 偵 查 技 巧 的 領 域 裡 , 近 十 年 來 亦 逐 漸 重 視 發 展 對 於 嫌 犯 人 格 質 及 行 為 模 式 的 心 理 描 繪 技 術 (Psychological profiling) , 其 內 涵 在 於 整 合 行 為 科 學 、 犯 罪 學 及 偵 查 技 巧 , 期 對 犯 罪 行 為 更 深 入
五 ○ 的 瞭 解 , 並 藉 偵 防 縱 火 犯 罪 資 料 之 有 效 建 立 , 做 為 日 後 國 內 發 展 有 關 「 嫌 犯 人 格 特 徵 描 繪 」 (Criminal Characteristics Profiling) 電 腦 系 統 之 基 礎 檔 案 , 而 有 助 於 警 察 人 員 對 縱 火 犯 罪 之 偵 查 、 鑑 識 及 逮 捕 工 作 。
( 十 一 ) 火 災 現 場 千 變 萬 化 , 舉 凡 貣 火 物 質 之 禑 類 、 數 量 、 建 築 結 構 、 室 內 擺 設 、 火 場 溫 度 、 持 續 時 間 、 救 災 行 動 、 氣 象 因 素 … … 等 , 皆 可 影 響 火 災 現 場 跡 證 之 是 否 留 存 。 故 欲 藉 模 擬 實 驗 來 觀 察 火 災 現 場 跡 證 之 變 化 , 並 進 行 鑑 定 , 實 為 一 相 當 困 難 且 為 長 期 性 之 研 究 工 作 , 必 須 專 業 鑑 定 人 員 之 積 極 、 耐 心 參 與 , 方 可 收 預 期 之 成 效 。
( 十 二 ) 美 國 針 對 火 災 調 查 鑑 定 之 教 育 訓 練 , 與 我 國 最 大 不 同 點 在 於 基 層 消 防 人 員 的 養 成 教 育 , 其 接 受 的 是 最 實 際 且 最 有 效 率 的 教 導 。 他 們 以 實 際 放 火 燒 房 子 的 方 式 來 進 行 教 育 訓 練 , 讓 每 一 個 消 防 同 仁 於 養 成 教 育 期 間 就 有 機 會 學 習 如 何 調 查 , 具 備 真 正 的 調 查 實 戰 經 驗 , 待 將 來 投 入 工 作 崗 位 , 即 可 發 揮 一 定 戰 力 , 不 像 我 國 的 養 成 教 育 , 只 會 紙 上 談 兵 , 連 一 個 專 屬 的 訓 練 場 地 都 沒 有 , 包 括 在 實 務 單 位 從 事 火 災 原 因 調 查 人 員 , 常 因 缺 乏 紮 實 的 學 習 及 豐 富 的 實 戰 經 驗 , 而 無 法 具 體 研 判 貣 火 處 、 所 及 原 因 , 顯 亟 待 改 進 。 另 關 於 縱 火 之 調 查 與 防 制 , 在 美 國 是 屬 功 能 聯 合 、 科 際 整 全 之 團 隊 工 作 , 火 災 調 查 體 系 除 由 消 警 人 員 通 力 合 作 外 , 保 險 業 者 為 防 範 詐 領 保 險 金 , 亦 可 對 現 場 進 行 調 查 , 擬 提 意 見 供 檢 警 機 關 參 考 。
( 十 三 ) 傳 統 上 強 調 以 「 救 火 」 為 主 的 消 防 救 災 觀 念 和 作 法 , 已 不 能 滿 足 現 代 民 眾 生 活 安 全 上 的 需 求 。 為 此 , 消 防 機 關 宜 改 變 思 考 的 方 向 , 更 積 極 地 自 火 災 防 制 基 礎 工 作 之
五 一
「 火 災 調 查 」 上 著 手 , 由 防 災 觀 點 更 重 視 火 災 調 查 結 果 的 運 用 , 發 揮 其 在 火 災 預 防 、 火 災 搶 救 上 之 重 要 參 考 性 和 效 益 性 , 並 突 破 以 往 火 災 調 查 調 人 員 僅 憑 個 人 經 驗 法 則 勘 查 火 災 案 件 、 單 純 以 線 性 化 統 計 分 析 火 災 資 料 及 被 動 處 理 縱 火 火 災 的 方 式 , 進 一 步 積 極 運 用 空 間 化 資 料 處 理 之 技 術 及 其 他 可 行 的 分 析 工 具 , 來 協 助 並 促 進 現 行 火 災 調 查 方 法 的 「 系 統 化 」 、 「 數 據 化 」 、 「 實 體 化 」 和 「 正 確 化 」 , 進 而 使 火 災 調 查 之 所 得 不 但 具 有 提 供 民 、 刑 事 責 任 認 定 之 消 極 功 能 , 而 且 更 能 發 揮 積 極 改 進 火 災 搶 救 技 術 及 提 供 火 災 預 防 有 效 資 訊 之 正 面 功 效 。
五 二 柒 、 調 查 意 見 :
據 內 政 部 及 行 政 院 主 計 處 統 計 資 料 , 近 十 ( 民 國 【 下 同 】 八 十 三 至 九 十 二 ) 年 台 灣 地 區 計 發 生 高 達 十 三 萬 四 千 餘 件 火 災 事 故 , 造 成 二 千 五 百 七 十 八 人 死 亡 、 七 千 一 百 零 四 人 受 傷 及 財 物 損 壞 、 醫 療 支 出 之 直 接 損 耗 約 逾 新 台 幣 ( 下 同 ) 三 百 九 十 四 億 五 千 萬 餘 元 ; 換 言 之 , 台 灣 地 區 每 天 帄 均 發 生 三 十 八 件 火 災 事 故 , 每 年 發 生 一 萬 三 千 四 百 餘 件 火 災 事 故 , 肇 致 成 千 上 萬 個 家 庭 因 此 遭 受 嚴 重 而 長 期 之 經 濟 及 精 神 負 擔 , 甚 至 可 能 破 碎 而 流 離 失 所 。 為 降 低 火 災 事 故 之 發 生 及 傷 亡 人 數 , 首 先 應 對 肇 禐 原 因 詳 加 鑑 定 分 析 , 據 以 改 善 防 火 管 理 作 為 及 消 防 法 令 等 方 面 之 缺 失 。 為 調 查 火 災 原 因 , 內 政 部 消 防 署 ( 下 禒 消 防 署 ) 設 有 火 災 調 查 組 及 中 央 鑑 定 實 驗 室 , 各 直 轄 市 、 縣 市 消 防 機 關 則 設 有 火 災 調 查 科 ( 課 ) , 專 職 火 災 原 因 之 調 查 及 火 場 殘 跡 證 物 之 鑑 定 業 務 , 其 調 查 結 果 客 觀 、 正 確 性 , 涉 及 刑 事 、 民 事 責 任 之 歸 屬 是 否 公 正 , 顯 然 攸 關 相 關 當 事 人 權 益 甚 鉅 , 以 每 年 火 災 案 件 帄 均 高 達 七 百 餘 件 為 原 因 不 明 案 件 以 觀 , 後 續 責 任 如 何 論 斷 、 歸 屬 及 民 眾 權 益 如 何 請 求 , 顯 令 人 憂 心 。 復 因 火 災 係 侵 害 社 會 法 益 , 較 之 一 般 侵 害 個 人 法 益 的 刑 案 而 言 , 其 造 成 社 會 成 本 及 人 命 、 財 物 的 損 失 , 更 為 嚴 重 , 消 防 機 關 鑑 定 結 果 之 影 響 層 面 自 明 , 其 相 關 制 度 健 全 與 否 , 確 有 待 深 入 瞭 解 。 又 據 本 院 相 關 調 查 案 件 之 所 得 、 司 法 機 關 委 請 消 防 署 重 新 調 查 鑑 定 之 案 件 及 媒 體 相 關 報 導 發 現 , 邇 來 各 市 、 縣 消 防 機 關 之 鑑 定 報 告 屢 遭 質 疑 , 與 勞 工 安 全 檢 查 機 構 之 鑑 定 結 果 又 常 欠 一 致 , 為 建 立 民 眾 對 鑑 定 結 果 之 公 信 力 , 加 強 保 障 民 眾 生 命 及 財 產 之 安 全 , 對 於 現 行 火 災 調 查 制 度 、 組 織 及 人 力 、 專 業 技 術 與 裝 備 、 運
五 三
作 與 功 能 等 相 關 事 項 , 亦 有 深 入 探 究 之 必 要 。
案 經 本 院 分 別 以 九 十 三 年 六 月 二 十 八 日 ( 九 三 ) 處 台 調 參 字 第 ○ 九 三 ○ 八 ○ 四 ○ 九 三 號 、 同 字 第 ○ 九 三 ○ 八 ○ 四 ○ 九 四 號 、 同 字 第 ○ 九 三 ○ 八 ○ 四 ○ 九 五 號 及 同 年 月 二 十 九 日 同 字 第 ○ 九 三 ○ 八 ○ 四 一 ○ 一 號 函 請 各 直 轄 市 、 縣 市 消 防 局 、 法 務 部 、 行 政 院 研 究 發 展 考 核 委 員 會 、 司 法 院 等 二 十 八 個 機 關 就 相 關 問 題 詳 實 說 明 見 復 , 嗣 經 上 開 機 關 分 別 於 同 年 七 月 八 日 至 十 月 六 日 查 復 到 院 。 本 院 嗣 於 同 年 七 月 十 六 日 約 詢 內 政 部 簡 太 郎 次 長 、 消 防 署 黃 季 敏 署 長 、 陳 武 雄 副 署 長 、 蕭 肇 寶 組 長 、 林 金 宏 專 門 委 員 、 周 鴻 呈 專 員 、 中 央 警 察 大 學 消 防 學 系 林 元 祥 主 任 、 內 政 部 警 政 署 ( 下 禒 警 政 署 ) 刑 事 警 察 局 高 政 昇 主 任 秘 書 、 蔡 東 成 研 究 員 、 劉 義 孝 組 長 、 台 灣 警 察 專 科 學 校 黃 書 郎 主 任 秘 書 、 消 防 安 全 科 潘 日 南 主 任 等 相 關 機 關 主 管 人 員 ; 本 院 並 自 同 年 七 月 至 十 月 間 , 持 續 蒐 集 火 災 調 查 鑑 定 相 關 學 術 研 究 著 作 、 文 章 、 書 籍 、 政 府 出 版 品 等 參 考 文 獻 及 各 市 縣 涉 有 疑 義 之 火 災 案 件 、 內 政 部 、 行 政 院 主 計 處 、 各 直 轄 市 、 縣 市 消 防 局 統 計 資 訊 等 相 關 資 料 , 業 調 查 竣 事 。 茲 分 述 調 查 意 見 如 后 :
一 、 火 災 調 查 鑑 定 組 織 未 臻 健 全 、 設 備 闕 舊 、 閒 置 , 品 質 難 以 提 升 :
( 一 ) 火 災 調 查 鑑 定 人 力 不 足 、 養 成 訓 練 欠 紮 實 、 素 質 偏 低 及 設 備 、 器 材 闕 漏 、 閒 置 :
1 、 內 政 部 疏 於 注 意 , 怠 未 對 早 已 存 在 有 年 之 消 防 署 缺 乏 訓 練 場 地 、 中 央 火 災 鑑 定 實 驗 室 人 力 、 腹 地 、 效 率 不 足 及 台 灣 警 察 專 科 學 校 相 關 養 成 訓 練 欠 紮 實 之 缺 失 及 窘 境 , 設 法 研 議 改 善 , 致 火 災 調 查 鑑 定 人 員 之 素 質 、 鑑 定 品 質 及 時 效 難 以 提 昇 , 殊 有 未 當 :
五 四 ( 1 ) 據 消 防 署 表 示 略 以 : 「 八 十 三 年 間 消 防 署 成 立 時 , 設 立 災 害 調 查 組 ( 九 十 一 年 間 改 為 火 災 調 查 組 ) , 下 設 調 查 科 及 鑑 定 科 。 其 中 鑑 定 科 職 司 全 國 火 災 現 場 證 物 之 鑑 定 工 作 , 並 於 八 十 六 年 時 成 立 中 央 鑑 定 實 驗 室 , 逐 年 購 置 火 災 調 查 鑑 定 之 儀 器 、 設 備 , 同 時 受 理 各 地 方 消 防 機 關 委 託 鑑 定 之 火 災 證 物 … … 該 實 驗 室 坐 落 台 北 市 襄 陽 路 一 號 八 樓 消 防 署 租 用 之 辦 公 大 樓 內 , 占 地 僅 約 六 十 二 坪 , 係 由 消 防 署 火 災 調 查 組 鑑 定 科 人 員 負 責 , 計 有 科 長 一 人 , 秘 書 一 人 , 薦 任 技 士 二 人 、 技 士 一 人 … … 晉 用 人 員 之 資 格 與 待 遇 均 與 各 地 方 政 府 火 災 調 查 人 員 標 準 一 致 … … 」 、 「 消 防 署 目 前 缺 乏 相 關 訓 練 場 地 , 故 火 災 證 物 鑑 定 儀 器 之 訓 練 , 係 假 中 央 鑑 定 實 驗 室 辦 理 。 」 次 據 台 中 市 、 嘉 義 縣 、 台 南 縣 、 屏 東 縣 等 消 防 局 之 說 明 略 為 : 「 消 防 署 中 央 鑑 定 實 驗 室 僅 有 二 名 實 際 從 事 火 災 證 物 鑑 定 之 人 員 , 無 法 鑑 定 大 量 來 自 全 國 各 縣 、 市 消 防 局 所 委 託 送 驗 之 火 災 證 物 , 往 往 於 火 災 發 生 後 二 、 三 個 星 期 方 得 知 結 果 , 建 請 消 防 署 增 加 火 災 證 物 鑑 定 人 員 或 擴 編 成 立 火 災 鑑 識 中 心 , 負 責 鑑 定 各 縣 市 送 請 化 驗 之 證 物 , 並 技 術 支 援 各 縣 市 之 申 請 案 件 , 以 兼 具 教 育 研 究 發 展 之 功 能 , 如 此 必 可 全 面 提 昇 鑑 識 能 力 與 火 災 預 防 功 效 。 」 、 「 建 議 消 防 署 增 設 中 部 與 南 部 鑑 定 實 驗 室 , 並 進 用 具 理 化 專 業 之 人 員 , 以 縮 短 各 縣 市 消 防 局 檢 送 火 災 現 場 證 物 鑑 定 所 需 往 返 時 間 , 除 可 分 攤 現 行 中 央 鑑 定 實 驗 室 人 手 不 足 窘 境 , 亦 可 因 應 刑 事 訴 訟 法 新 制 │ 交 互 詰 問 制 度 之 實 施 … … 」 復 就 警 政 署 刑 事 警 察 局 鑑 識 科 下 設 毒 物 、 聲 紋 、 電 氣 、 痕 跡 、 測 謊 、
五 五
測 繪 、 綜 合 … … 等 十 個 業 務 組 之 編 制 規 模 及 已 成 立 第 二 辦 公 室 之 腹 地 以 觀 , 消 防 署 顯 然 存 在 中 央 火 災 鑑 定 實 驗 室 人 力 不 足 、 腹 地 狹 小 及 欠 缺 訓 練 場 地 等 窘 境 。 又 較 之 刑 事 警 察 局 及 消 防 署 之 鑑 定 能 力 , 以 九 十 二 年 為 例 , 刑 事 警 察 局 全 年 受 理 鑑 定 案 件 數 約 二 萬 七 千 餘 件 , 以 目 前 一 百 零 八 名 鑑 識 人 力 計 算 , 每 人 每 年 平均鑑定二五○件,而消防署中央鑑定實驗室年約六百餘件,以目前六名人 均 鑑 定 二 五 ○ 件 , 而 消 防 署 中 央 鑑 定 實 驗 室 年 約 六 百 餘 件 , 以 目 前 六 名 人 力 計 算 , 每 人 每 年 平均鑑定僅約一○○件,亦見消防署鑑定能力、效率,顯有 均 鑑 定 僅 約 一 ○ ○ 件 , 亦 見 消 防 署 鑑 定 能 力 、 效 率 , 顯 有 不 迨 。
( 2 ) 次 依 各 直 轄 市 、 縣 市 消 防 局 查 復 資 料 , 各 直 轄 市 、 縣 市 消 防 局 從 事 火 災 調 查 鑑 定 人 員 , 部 分 係 畢 業 於 台 灣 警 察 專 科 學 校 , 惟 據 該 校 查 復 稱:「警察專科學 : 「 警 察 專 科 學 校 學 生 在 校 接 受 二 年 教 育 期 間 , 因 專 業 課 程 眾 多 , 火 災 調 查 鑑 定 課 程 教 學 係 以 課 程 講 授 為 主 , 無 相 關 實 驗 課 程 之 安 排 , 故 無 專 業 實 驗 室 之 設 置 。 」 足 見 畢 業 於 台 灣 警 察 專 科 學 校 於 各 消 防 機 關 從 事 火 災 調 查 鑑 定 之 人 員 , 並 未 接 受 實 驗 室 鑑 定 專 業 之 訓 練 , 雖 上 揭 人 員 畢 業 後 均 受 過 消 防 署 火 災 調 查 鑑 定 相 關 訓 練 課 程 , 惟 仍 乏 實 驗 室 實 戰 經 驗 , 實 不 足 以 因 應 具 高 度 專 業 性 之 火 災 調 查 鑑 定 業 務 , 此 分 別 觀 之 八 十 七 年 二 月 二 十 七 日 消 防 署 徐 文 郎 專 員 等 四 人 撰 寫 之 赴 日 研 習 消 防 安 全 設 備 器 材 檢 驗 技 術 提 出 之 公 務 出 國 報 告 早 已 載 明 略 以 : 「 … … 赴 日 研 習 火 災 原 因 調 查 鑑 定 技 術 之 心 得 暨 建 議 , 概 述 如 后 : … … ( 三 ) 設 置 消 防 學 校 及 訓 練 中 心 , 加 強 在 職 教 育 與 人 才 培 訓 … … 」 及 九 十 年 四 月 一 日 內 政 部 林 金 宏 科
五 六 長 撰 寫 之 美 國 縱 火 調 查 體 系 專 題 研 究 出 國 報 告 書 內 容 載 明 略 為 : 「 美 國 針 對 火 災 調 查 鑑 定 之 教 育 訓 練 , 與 我 國 最 大 不 同 點 是 在 於 基 層 消 防 人 員 的 養 成 教 育 , 其 接 受 的 是 最 實 際 且 最 有 效 率 的 教 導 , 他 們 以 實 際 放 火 燒 房 子 的 方 式 來 進 行 教 育 訓 練 , 讓 每 一 個 消 防 同 仁 於 養 成 教 育 期 間 就 有 機 會 學 習 如 何 調 查 , 具 備 真 正 的 調 查 實 戰 經 驗 , 待 將 來 投 入 工 作 崗 位 , 即 可 發 揮 一 定 之 戰 力 , 不 像 我 國 的 養 成 教 育 , 只 會 紙 上 談 兵 , 連 一 個 專 屬 的 訓 練 場 地 都 沒 有 , 包 括 在 實 務 單 位 從 事 火 災 原 因 調 查 人 員 , 常 因 沒 有 紮 實 的 學 習 及 豐 富 的 實 戰 經 驗 , 而 無 法 具 體 研 判 起 火處所及原因,顯亟待改進 火 處 所 及 原 因 , 顯 亟 待 改 進 … … 」 益 證 上 開 所 指 「 養 成 訓 練 教 育 欠 紮 實 、 素 質 偏 低 及 乏 訓 練 場 地 」 等 缺 失 存 在 已 久 , 內 政 部 卻 迄 未 改 善 , 致 難 以 有 效 提 昇 火 災 證 物 鑑 定 人 員 素 質 、 鑑 定 品 質 及 時 效 , 殊 有 未 當 。
2 、 內 政 部 未 對 部 分 地 方 消 防 局 未 設 置 火 災 調 查 鑑 定 專 責 單 位 、 人 力 不 足 及 設 備 闕 舊 等 問 題 , 促 請 各 直 轄 市 、 縣 市 政 府 研 謀 解 決 , 核 有 失 當 :
( 1 ) 按 消 防 署 九 十 二 年 十 二 月 十 六 日 消 署 調 字 第 ○ 九 二 ○ 九 ○ ○ 三 四 三 號 函 發 布 之 「 火 災 調 查 業 務 人 力 不 足 分 析 報 告 及 因 應 措 施 」 貳 、 現 況 分 析 載 明 略 為 : 「 經 初 步 統 計 , 目 前 各 警 察 機 關 現 有 鑑 識 人 員 為 二 八 一 人 , 除 台 北 市 、 高 雄 市 已 成 立 鑑 識 中 心 外 , 其 他 縣 ( 市 ) 政 府 並 已 提 昇 現 有 編 組 , 陸 續 規 劃 成 立 鑑 識 中 心 ( 課 ) , 鑑 識 人 力 勢 再 擴 充 一 倍 ; 反 觀 各 消 防 機 關 現 有 火 災 調 查 人 員 僅 一 四 七 人 , 且 部 分 縣 市 消 防 局 火 災 調 查 人 員 尚 須 兼 辦 其 他 業 務 , 而 每 年 需 處 理 之 火 災
五 七
案 件 數 則 達 一 萬 三 千 件 以 上 … … 加 以 火 災 現 場 之 範 圍 廣 闊 , 均 遠 大 於 刑 案 現 場 … … 經 對 火 災 調 查 業 務 現 況 之 詳 加 分 析 , 並 蒐 集 、 分 析 美 、 日 等 國 家 火 災 原 因 調 查 情 形 , 建 議 每 件 火 災 案 件 調 查 鑑 定 人 力 至 少 為 七 人 , 即 現 場 調 查 指 揮 官 一 人 、 挖 掘 人 員 二 人 至 三 人 、 現 場 關 係 人 訪 查 、 詢 問 及 筆 錄 製 作 人 員 二 人 、 照 相 及 錄 影 人 員 各 一 人 、 測 繪 製 圖 人 員 一 人 、 火 場 證 物 實 驗 分 析 人 員 一 人 至 二 人 … … 」 。
( 2 ) 惟 依 據 各 直 轄 市 、 縣 市 消 防 局 查 復 資 料 , 各 消 防 局 辦 理 火 災 調 查 人 力 , 除 台 北 市 ( 二 五 人 ) 、 台 北 縣 ( 十 人 ) 、 嘉 義 縣 ( 七 人 ) 、 高 雄 縣 ( 九 人 ) 、 高 雄 市 ( 一 二 人 ) 人 力 尚 符 合 上 開 人 力 需 求 外 , 其 餘 縣 市 消 防 局 大 部 分 僅 為 二 人 至 三 人 , 遠 不 及 上 開 最 低 需 求 標 準 , 甚 且 有 雲 林 縣 、 花 蓮 縣 、 金 門 縣 及 連 江 縣 地 方 政 府 消 防 局 尚 未 成 立 火 災 調 查 專 責 單 位 , 而 以 任 務 編 組 或 職 務 兼 辦 之 型 態 辦 理 火 災 調 查 工 作 , 火 災 調 查 鑑 定 人 力 普 遍 不 足 , 肇 致 鑑 定 品 質 屢 遭 質 疑 及 詬 病 ; 甚 有 媒 體 報 導 : 「 火 災 調 查 人 力 不 足 , 致 歹 徒 有 機 可 趁 , 縱 火 詐 領 保 險 金 。 」 且 據 消 防 署 說 明 : 「 各 級 法 院 於 審 理 時 , 法 官 、 火 災 案 件 當 事 人 往 往 會 質 疑 縣 市 消 防 局 調 查 結 果 之 完 整 性 及 正 確 性 , 故 常 函 請 消 防 署 協 助 並 重 新 調 查 鑑 定 … … 」 及 基 隆 市 、 苗 栗 縣 、 南 投 縣 、 宜 蘭 縣 、 彰 化 縣 、 嘉 義 縣 、 花 蓮 縣 、 屏 東 縣 、 澎 湖 縣 等 消 防 局 之 檢 討 建 議 : 「 消 防 調 查 鑑 定 人 力 不 足 , 建 議 增 補 」 足 見 部 分 消 防 機 關 未 設 置 火 災 調 查 專 責 單 位 及 人 力 不 足 , 已 嚴 重 影 響 鑑 定 品 質 , 殊 有 未 當 。
五 八 ( 3 ) 又 據 消 防 署 及 基 隆 市 、 宜 蘭 縣 、 嘉 義 縣 等 消 防 局 分 別 表 示 略 以 : 「 由 於 火 災 原 因 調 查 工 作 較 難 凸 顯 地 方 消 防 機 關 之 績 效 , 亦 無 法 衡 量 民 眾 對 消 防 機 關 之 滿 意 度 , 因 此 經 費 及 設 備 不 易 爭 取 。 有 些 地 方 消 防 機 關 之 火 災 鑑 識 車 、 照 相 錄 影 器 材 、 鑑 定 儀 器 不 是 老 舊 就 是 闕 如 , 僅 有 消 防 署 歴 年 補 助 的 簡 易 儀 器 與 設 備 , 實 不 足 以 因 應 火 災 現 場 調 查 及 證 物 鑑 定 分 析 之 所 需 , 影 響 火 災 調 查 、 鑑 定 之 品 質 … … 因 消 防 係 屬 地 方 事 務 , 人 員 調 度 、 經 費 等 均 屬 地 方 權 責 … … 」 、 「 消 防 局 經 費 不 足 , 致 火 災 調 查 鑑 定 設 備 不 符 需 求 … … 」 顯 見 地 方 消 防 機 關 火 災 調 查 鑑 定 設 備 之 不 足 及 老 舊 , 內 政 部 未 能 促 請 各 直 轄 市 、 縣 市 政 府 研 謀 解 決 , 致 火 災 案 件 鑑 定 品 質 難 以 提 昇 , 亦 難 辭 監 督 不 周 之 責 。
3 、 消 防 署 怠 於 監 督 , 致 有 十 三 個 縣 市 消 防 局 未 善 加 利 用 促 燃 劑 殘 跡 證 物 之 鑑 定 儀 器 而 予 閒 置 荒 廢 情 事 , 確 有 未 當 :
據 中 央 警 察 大 學 及 台 灣 警 察 專 科 學 校 於 本 院 約 詢 後 補 充 資 料 說 明 略 以 : 「 對 於 火 災 證 物 鑑 定 儀 器 , 世 界 各 國 並 無 統 一 標 準 , 係 由 各 鑑 識 單 位 視 欲 分 析 鑑 定 之 證 物 而 異 , 一 般 而 言 , 氣 相 層 析 質 譜 儀 或 氣 相 層 析 儀 係 用 於 促 燃 劑 殘 跡 證 物 之 必 要 鑑 定 儀 器 , 而 金 相 顯 微 鏡 係 為 現 場 電 氣 證 物 鑑 識 之 輔 助 性 儀 器 … … … 除 澎 湖 縣 、 金 門 縣 及 連 江 縣 等 消 防 局 外 , 餘 均 有 促 燃 劑 殘 跡 證 物 鑑 定 儀 器 , 而 未 配 發 儀 器 之 縣 市 消 防 局 , 則 配 有 促 燃 劑 檢 知 管 及 紫 外 線 燈 等 初 步 鑑 識 器 材 。 」 是 以 , 全 國 二 十 五 個 直 轄 市 、 縣 市 消 防 局 , 除 澎 湖 縣 、 金 門 縣 及 連 江 縣 等 三 個 消 防 局 外 ,
五 九
其 餘 二 十 二 個 消 防 局 均 可 利 用 自 身 設 備 鑑 定 促 燃 劑 等 殘 跡 證 物 , 惟 消 防 署 於 本 院 約 詢 後 補 充 資 料 竟 表 示 : 「 目 前 僅 台 北 市 政 府 消 防 局 自 行 鑑 定 促 燃 劑 及 電 線 熔 痕 之 證 物 , 而 高 雄 市 、 新 竹 市 、 台 南 市 、 台 北 縣 、 桃 園 縣 、 雲 林 縣 、 嘉 義 縣 、 台 南 縣 等 八 縣 市 則 自 行 鑑 定 促 燃 劑 證 物 , 其 餘 縣 市 消 防 局 採 樣 之 證 物 均 送 消 防 署 協 助 鑑 定 、 分 析 … … 」 云 云 , 顯 見 該 二 十 二 個 擁 有 鑑 定 促 燃 劑 等 殘 跡 證 物 儀 器 設 備 之 縣 市 消 防 局 , 僅 台 北 市 、 高 雄 市 、 新 竹 市 、 台 南 市 、 台 北 縣 、 桃 園 縣 、 雲 林 縣 、 嘉 義 縣 、 台 南 縣 等 九 個 消 防 局 自 行 鑑 定 , 其 餘 十 三 個 縣 市 消 防 局 竟 仍 將 促 燃 劑 證 物 送 請 消 防 署 中 央 鑑 定 實 驗 室 鑑 定 , 顯 然 閒 置 國 家 資 源 , 浪 費 公 帑 , 消 防 署 怠 於 監 督 , 確 有 未 當 , 允 應 切 實 查 究 。
( 二 ) 火 災 鑑 定 委 員 會 功 能 明 顯 不 彰 , 部 分 成 員 引 發 爭 議 :
1 、 消 防 署 未 善 盡 監 督 之 責 , 致 各 直 轄 市 、 縣 市 火 災 案 件 數 由 火 災 鑑 定 委 員 會 鑑 定 之 比 率 平均未及○‧一%,功能明顯不彰,且部分縣市未依規定每年開會,委員會形同 均 未 及 ○ ‧ 一 % , 功 能 明 顯 不 彰 , 且 部 分 縣 市 未 依 規 定 每 年 開 會 , 委 員 會 形 同 虛 設 , 殊 有 未 當 :
按 消 防 署 發 布 之 直 轄 市 縣 市 政 府 火 災 鑑 定 委 員 會 設 置 基 準 及 指 導 要 點 第 二 點 規 定 : 「 火 災 鑑 定 委 員 會 之 任 務 如 下 : 一 、 關 於 轄 區 火 災 之 鑑 定 案 件 。 二 、 關 於 其 他 消 防 機 關 移 請 鑑 定 之 重 大 火 災 案 件 。 三 、 關 於 司 法 機 關 囑 託 鑑 定 之 火 災 案 件 。 四 、 關 於 火 災 鑑 定 之 新 技 術 、 新 設 備 之 蒐 集 、 研 究 、 適 用 及 改 進 事 項 。 」 第 十 三 點 規 定 : 「 鑑 定 委 員 會 每 一 年 至 少 應 召 開 委 員 會 一 次 , 檢 討 會 務 及 技 術 研 究 事 宜 。 」
六 ○ 惟 查 近 十 ( 八 十 三 至 九 十 二 ) 年 各 直 轄 市 、 縣 市 火 災 案 件 送 請 轄 區 火 災 鑑 定 委 員 會 鑑 定 比 率 帄 均 遠 不 及 ○ ‧ 一 % , 甚 至 有 基 隆 、 宜 蘭 、 雲 林 、 屏 東 、 花 蓮 、 金 門 、 連 江 等 七 個 縣 市 政 府 火 災 鑑 定 委 員 會 成 立 多 年 , 迄 未 曾 鑑 定 任 何 火 災 案 件 , 甚 且 有 火 災 鑑 定 委 員 會 未 依 規 定 每 年 召 開 會 議 討 論 情 事 , 有 違 上 開 鑑 定 委 員 會 設 置 任 務 , 功 能 明 顯 不 彰 , 形 同 虛 設 , 殊 有 未 當 。
2 、 彰 化 縣 政 府 延 聘 刻 於 法 院 審 理 中 火 災 案 件 之 當 事 人 為 火 災 鑑 定 委 員 會 委 員 , 招 致 爭 議 , 自 有 未 當 :
按 各 縣 市 政 府 火 災 調 查 鑑 定 委 員 會 負 責 轄 內 火 災 案 件 之 鑑 定 , 其 委 員 之 組 成 及 素 質 之 良 窳 , 顯 涉 及 相 關 當 事 人 權 益 至 深 且 鉅 , 各 縣 市 政 府 自 應 遴 選 專 業 、 公 正 及 客 觀 人 士 擔 任 委 員 , 以 維 護 案 件 鑑 定 品 質 。 惟 彰 化 縣 政 府 不 此 之 圖 , 竟 延 聘 火 災 案 件 刻 於 法 院 審 理 中 之 被 告 擔 任 火 災 鑑 定 委 員 會 委 員 , 招 致 爭 議 , 此 分 別 觀 之 台 灣 彰 化 地 方 法 院 檢 察 署 九 十 一 年 八 月 一 日 院 彰 檢 朝 法 九 一 偵 二 一 ○ ○ 字 第 二 七 七 二 號 函 及 消 防 署 同 年 九 月 十 一 日 消 署 調 字 第 九 一 ○ ○ 一 二 ○ 八 四 號 函 之 說 明 載 明 略 以 : 「 查 九 十 年 八 月 三 十 一 日 一 時 七 分 許 彰 化 縣 埤 頭 鄉 合 興 村 彰 水 路 四 七 一 巷 ○ ○ 號 火 災 案 件 , 刻 於 彰 化 地 方 法 院 審 理 中 , 被 告 翁 ○ ○ 先 生 , 縣 府 卻 延 聘 渠 擔 任 火 災 鑑 定 委 員 會 委 員 … … 為 避 免 影 響 火 災 調 查 鑑 定 之 客 觀 性 及 公 正 性 , 請 消 防 局 審 慎 遴 選 。 」 甚 明 , 自 有 未 當 。
二 、 火 災 調 查 鑑 定 制 度 及 運 作 機 制 缺 漏 不 全 , 弊 病 叢 生
六 一
( 一 ) 內 政 部 未 善 盡 監 督 職 責 , 致 警 政 署 刑 事 警 察 局 暨 各 刑 事 警 察 機 關 , 怠 未 依 規 定 切 實 配 合 消 防 機 關 於 第 一 時 間 抵 達 火 災 現 場 勘 驗 , 延 誤 火 災 案 件 刑 事 偵 辦 時 效 , 無 異 為 縱 火 案 件 逐 年 攀 升 之 主 因 , 顯 有 重 大 違 失 :
1 、 查 各 級 警 察 機 關 人 員 之 任 務 為 : 「 依 法 維 持 公 共 秩 序 , 保 謢 社 會 安 全 , 防 止 一 切 危 害 , 促 進 人 民 福 利 。 」 及 職 權 為 : 「 … … 三 、 協 助 偵 查 犯 罪 。 四 、 執 行 搜 索 、 扣 押 、 拘 提 及 逮 捕 … … 七 、 有 關 警 察 業 務 之 保 安 … … 消 防 、 救 災 … 等 事 項 。 八 、 其 他 應 執 行 法 令 事 項 。 」 警 察 法 第 二 條 及 第 九 條 揭 示 甚 明 。 警 政 署 為 因 應 各 級 警 察 機 關 偵 辦 上 揭 刑 案 工 作 之 需 要 , 並 確 保 刑 案 現 場 勘 查 採 樣 品 質 , 爰 分 別 訂 定 「 警 察 偵 查 規 範 」 及 「 刑 事 鑑 識 規 範 」 。 其 中 刑 事 鑑 識 規 範 第 二 條 規 定 : 「 本 規 範 所 稱刑事 刑 事 鑑 識 之 範 圍 如 下 : ( 一 ) 物 理 鑑 識 。 ( 二 ) 化 學 鑑 識 。 ( 三 ) 電 氣 鑑 識 … … ( 五 ) 痕 跡 鑑 識 。 ( 六 ) 影 像 鑑 識 。 … ( 十 ) 指 紋 鑑 識 … … ( 十 二 ) 刑 案 現 場 處 理 。 」 第 二 十 條 規 定 : 「 化 學 證 物 之 處 理 原 則 … … ( 八 ) 縱 火 劑 及 殘 留 物 1 、 涉 及 縱 火 所 殘 留 之 證 物 , 應 立 即 置 於 專 用 之 耐 龍 材 質 塑 膠 袋 … … 」 第 二 十 一 條 規 定 : 「 電 氣 證 物 之 處 理 原 則 如 下 : … … ( 二 ) 起火點附近之可疑電線全部採取【必須檢附火警現場 火 點 附 近 之 可 疑 電 線 全 部 採 取 【 必 須 檢 附 火 警 現 場 配 線 及 電 器 位 置 圖 , 並 在 圖 上 註 明 該 電 線 之 位 置 】 。 ( 三 ) 可 疑 電 器 , 必 須 連 同 該 電 器 之 電 源 線 全 部 採 取 【 必 須 附 火 警 現 場 圖 , 並 在 圖 上 註 明 該 電 器 之 位 置 … … 】 」 及 警 察 偵 查 犯 罪 規 範 第 六 條 規 定 : 「 刑 案 偵 查 應 以 現 場 為 基 礎 , 運 用 科 學 器 材 與 方 法 , 細 心 勘 察 , 切 實 調 查 , 深 入 研 析 , 發 掘 線 索 , 合 法 取 證 , 並 配 合 刑 事 科 學 鑑
六 二 識 技 術 證 明 犯 罪 。 」 是 火 災 現 場 , 無 不 涉 及 物 理 鑑 識 、 化 學 鑑 識 、 電 氣 鑑 識 、 痕 跡 鑑 識 、 影 像 鑑 識 、 指 紋 鑑 識 、 刑 案 現 場 處 理 等 刑 事 鑑 識 範 圍 , 各 級 刑 事 警 察 機 關 自 應 視 其 為 刑 案 現 場 , 而 刑 案 偵 查 , 首 以 現 場 為 基 礎 , 尤 重 採 證 之 即 時 , 不 容 絲 毫 怠 慢 及 延 誤 , 以 免 喪 失 破 案 之 契 機 。
2 、 按 刑 法 第 一 百 一 十 章 公 共 危 險 罪 章 第 一 百 七 十 三 條 ( 放 火 或 失 火 燒 燬 現 住 建 築 物 及 交 通 工 具 罪 ) 規 定 : 「 放 火 燒 燬 現 供 人 使 用 之 住 宅 或 現 有 人 所 在 之 建 築 物 、 礦 坑 、 火 車 、 電 車 或 其 他 供 水 、 陸 、 空 公 眾 運 輸 之 舟 、 車 、 航 空 機 者 , 處 無 期 徒 刑 或 七 年 以 上 有 期 徒 刑 。 失 火 燒 燬 前 項 之 物 者 , 處 一 年 以 下 有 期 徒 刑 、 拘 役 或 五 百 元 以 下 罰 金 。 第 一 項 之 未 遂 犯 罰 之 。 預 備 犯 第 一 項 之 罪 者 , 處 一 年 以 下 有 期 徒 刑 、 拘 役 或 三 百 元 以 下 罰 金 。 」 第 一 百 七 十 四 條 ( 放 火 失 火 燒 燬 非 現 住 建 築 物 及 交 通 工 具 罪 ) 規 定 : 「 放 火 燒 燬 現 非 供 人 使 用 之 他 人 所 有 住 宅 或 現 未 有 人 所 在 之 他 人 所 有 建 築 物 … … 者 , 處 三 年 以 上 十 年 以 下 有 期 徒 刑 。 放 火 燒 燬 前 項 之 自 己 所 有 物 , 致 生 公 共 危 險 者 , 處 六 月 以 上 五 年 以 下 有 期 徒 刑 。 失 火 燒 燬 第 一 項 之 物 者 , 處 六 月 以 下 有 期 徒 刑 、 拘 禁 或 三 百 元 以 下 罰 金 。 失 火 燒 燬 前 項 之 物 , 致 生 公 共 危 險 者 , 亦 同 。 第 一 項 之 未 遂 犯 罰 之 。 」 第 一 百 七 十 五 條 ( 放 火 燒 燬 住 宅 等 以 外 之 物 罪 ) 規 定 : 「 放 火 燒 燬 前 二 條 以 外 之 他 人 所 有 物 , 致 生 公 共 危 險 者 , 處 一 年 以 上 七 年 以 下 有 期 徒 刑 。 放 火 燒 燬 前 二 條 以 外 之 自 己 所 有 物 , 致 生 公 共 危 險 者 , 處 三 年 以 下 有 期 徒 刑 。 失 火 燒 燬 前 二 條 以 外 之 物 , 致 生 公 共 危 險 者 , 處 拘 役 或 三 百 元 以 下 罰 金 。 」
六 三
第 一 百 七 十 六 條 ( 準 放 火 罪 ) 規 定 : 「 故 意 或 因 過 失 , 以 火 藥 、 蒸 氣 、 電 氣 、 煤 氣 或 其 他 爆 裂 物 , 炸 燬 前 三 條 之 物 者 , 準 用 各 該 條 放 火 、 失 火 之 規 定 。 」 是 火 災 原 因 之 態 樣 分 為 失 火 及 縱 火 二 種,凡此因失火或縱火而成之火災案件,在刑法上,不 , 凡 此 因 失 火 或 縱 火 而 成 之 火 災 案 件 , 在 刑 法 上 , 不 論 故 意 或 過 失 , 均 為 涉 有 公 共 危 險 之 公 訴 罪 , 自 屬 依 刑 法 偵 辦 之 刑 案 範 疇 , 各 刑 事 警 察 機 關 洵 應 切 實 依 據 前 開 「 警 察 偵 查 規 範 」 及 「 刑 事 鑑 識 規 範 」 關 於 「 刑 案 現 場 偵 查 及 鑑 識 」 之 要 領 , 按 「 受 理 刑 案 報 案 處 理 作 業 程 序 」 , 迅 即 赴 現 場 勘 查 蒐 證 , 爰 無 選 擇 免 赴 現 場 勘 查 之 裁 量 餘 地 , 且 火 災 案 件 危 害 社 會 法 益 , 影 響 範 圍 及 層 面 較 之 侵 害 個 人 法 益 之 一 般 刑 案 , 既 深 且 廣 , 刑 事 警 察 機 關 豈 能 稍 有 不 迨 , 尤 應 謹 慎 為 之 。 況 警 、 消 機 關 分 隸 前 , 「 台 灣 地 區 各 級 警 察 機 關 火 災 調 查 實 施 要 點 」 早 已 明 定 : 「 … … 二 、 火 災 調 查 之 權 責 區 分 : ( 一 ) 消 防 警 察 單 位 負 責 火 災 原 因 調 查 之 勘 查 及 鑑 定 , 未 設 消 防 警 察 單 位 之 警 察 機 關 , 則 由 刑 事 警 察 單 位 負 責 。 ( 二 ) 刑 事 警 察 單 位 負 責 火 災 刑 事 偵 查 。 」 至 警 消 機 關 分 隸 後 , 直 轄 市 縣 市 消 防 機 關 火 場 指 揮 及 搶 救 作 業 要 點 第 二 點 更 明 定 : 「 火 場 指 揮 官 區 分 : ( 一 ) 火 場 總 指 揮 官 : 由 消 防 局 局 長 擔 任 。 ( 二 ) 火 場 副 總 指 揮 官 : 由 消 防 局 副 局 長 擔 任 。 ( 三 ) 救 火 指 揮 官 : 由 轄 區 消 防 大 ( 中 ) 隊 長 擔 任 , 火 災 初 期 由 轄 區 消 防 分 隊 長 擔 任 。 ( 四 ) 警 戒 指 揮 官 : 協 調 轄 區 警 察 局 派 員 擔 任 。 ( 五 ) 偵 查 指 揮 官 : 協 調 轄 區 警 察 局 派 員 擔 任 。 」 第 三 點 規 定 : 「 火 場 指 揮 官 任 務 : … … ( 三 ) 警 戒 指 揮 官 : 1 、 指 揮 火 場 警 戒 及 維 持 治 安 勤 務 。 2 、 指 揮 火 場 週 邊 道 路 交 通 管 制 及 疏 導 勤 務 。 3 、 指 揮 強 制
六 四 疏 散 警 戒 區 之 人 車 , 維 護 火 場 秩 序 。 4 、 必 要 時 由 轄 區 消 防 機 關 通 知 協 助 保 持 火 場 現 場 完 整 , 以 利 火 場 勘 查 及 鑑 定 。 ( 四 ) 偵 查 指 揮 官 任 務 : 1 、 刑 案 發 生 , 指 揮 現 場 勘 查 工 作 。 2 、 指 揮 火 警 之 刑 事 偵 查 工 作 。 3 、 火 警 現 場 之 其 他 偵 防 工 作 。 」 是 各 刑 事 警 察 單 位 人 員 , 允 屬 各 轄 火 災 現 場 工 作 小 組 之 必 要 成 員 , 自 應 於 第 一 時 間 配 合 消 防 機 關 火 災 調 查 人 員 趕 赴 現 場 進 行 刑 案 偵 查 工 作 , 合 先 敘 明 。
3 、 惟 查 , 各 刑 事 警 察 機 關 屢 屢 俟 收 到 消 防 機 關 函 送 之 火 災 原 因 調 查 報 告 書 後 , 方 行 進 行 火 災 案 件 刑 事 部 分 之 偵 辦 , 而 消 防 機 關 火 災 調 查 報 告 書 撰 寫 完 成 所 需 時 間 , 屢 逾 月 餘 之 久 , 觀 之 火 災 現 場 封 鎖 作 業 之 不 確 實 , 斯 時 始 勘 驗 現 場 , 顯 然 已 喪 失 刑 案 相 關 跡 證 之 蒐 證 及 偵 查 契 機 , 以 邇 來 逐 年 攀 升 之 縱 火 率 以 觀 , 內 政 部 顯 難 辭 監 督 不 力 之 咎 , 洵 有 重 大 違 失 , 此 分 別 觀 之 消 防 署 表 示 略 為 : 「 轄 區 警 察 機 關 常 常 在 收 到 火 災 原 因 調 查 報 告 書 後 , 方 進 行 偵 辦 , 往 往 已 失 時 效 性 , 延 誤 破 案 時 機 。 」 「 … … 火 災 原 因 調 查 人 員 對 於 刑 案 之 跡 證 , 例 如 潛 伏 指 紋 、 兇 器 、 煙 蒂 之 唾 液 … … 等 各 項 跡 證 或 關 係 人 之 供 詞 真 偽 之 判 斷 , 並 未 受 過 相 關 刑 案 蒐 證 之 專 業 訓 練 , 往 往 因 挖 掘 、 清 理 起火處之受燒物品,致破壞相關跡證而不自知 火 處 之 受 燒 物 品 , 致 破 壞 相 關 跡 證 而 不 自 知 … … 警 察 機 關 俟 消 防 機 關 於 多 日 之 現 場 調 查 、 跡 證 鑑 定 分 析 後 , 確 認 為 縱 火 案 件 時 , 或 收 到 火 災 原 因 調 查 報 告 書 後 , 方 開 始 偵 辦 , 已 喪 失 現 場 相 關 跡 證 之 蒐 證 及 偵 查 契 機 … 」 中 央 警 察 大 學 之 說 明 略 以 : 「 … 希 望 警 察 機 關 亦 能 辦 理 火 災 現 場 之 勘 查 與 鑑 定 工 作 , 如 此 在 火 災 公 共 危 險 罪 之 追 訴 上 , 較 易 爭 取 時 效 , 對 相 關 之 縱 火 案 件 亦 可 得 嚇 阻 之
六 五
效 果 … 」 甚 明 。
4 、 警 政 署 雖 於 本 院 約 詢 後 補 充 資 料 表 示 略 為 : 「 … … 經 消 防 機 關 鑑 定 為 縱 火 案 件 後 , 由 警 察 機 關 依 專 業 警 察 常 用 勤 ( 業 ) 務 執 行 程 序 彙 編 二 十 八 、 縱 火 案 件 處 理 程 序 進 行 偵 查 工 作 … 」 「 基 於 鑑 識 人 力 嚴 重 不 足 及 專 業 分 工 之 差 異 , 目 前 鑑 識 人 員 無 法 配 合 消 防 機 關 每 年 約 一 萬 餘 件 之 火 災 現 場 蒐 證 及 勘 察 工 作 … … 」 「 … … 警 政 署 雖 規 劃 各 縣 市 警 察 局 成 立 鑑 識 課 , 惟 各 縣 市 政 府 囿 於 財 政 困 難 , 預 算 員 額 無 法 大 幅 增 加 , 現 有 鑑 識 人 力 已 無 法 因 應 龐 大 刑 案 量 之 現 場 勘 察 、 採 證 及 重 建 工 作 , 加 以 刑 事 訴 訟 新 制 實 施 後 , 鑑 識 人 員 必 須 面 臨 法 庭 交 互 詰 問 制 度 與 嚴 格 證 據 法 則 之 挑 戰 , 刑 案 現 場 勘 察 採 證 與 證 物 之 處 理 益 加 耗 時 , 程 序 要 求 亦 更 加 嚴 謹 , 對 於 已 顯 不 足 的 鑑 識 人 力 , 無 異 雪 上 加 霜 … 」 「 … … 警 政 署 雖 已 規 劃 增 置 鑑 識 人 力 , 惟 因 人 力 來 源 及 培 訓 , 非 短 期 可 完 成 , 且 規 劃 增 置 之 人 力 , 亦 以 因 應 刑 案 為 目 標 … … 」 惟 前 開 各 項 法 令 規 定 應 執 行 之 事 項 , 各 刑 事 警 察 機 關 自 應 切 實 遵 守 , 況 查 警 政 署 前 開 所 稱「 「 專 業 警 察 常 用 勤 ( 業 ) 務 執 行 程 序 彙 編 二 十 八 、 縱 火 案 件 處 理 程 序 」 亦 明 確 規 定 , 縱 火 案 件 是 否 成 案 , 係 由 警 政 機 關 自 行 認 定 , 而 當 案 件 有 疑 義 時 , 方 依 據 消 防 機 關 火 災 原 因 調 查 報 告 書 辦 理 , 是 警 政 署 上 開 辯 稱:「 : 「 … … 經 消 防 機 關 鑑 定 為 縱 火 案 件 後 , 由 警 察 機 關 依 專 業 警 察 常 用 勤 ( 業 ) 務 執 行 程 序 彙 編 二 十 八 、 縱 火 案 件 處 理 程 序 進 行 偵 查 工 作 … 」 顯 倒 置 該 處 理 程 序 , 除 明 顯 與 規 定 有 違 , 亦 有 刻 意 誤 導 本 院 之 嫌 , 殊 有 未 當 。
六 六 ( 二 ) 內 政 部 疏 未 對 各 消 防 機 關 、 警 察 機 關 就 火 災 現 場 尚 未 完 成 調 查 鑑 定 之 封 鎖 及 撤 銷 封 鎖 作 業 , 律 定 作 業 規 範 及 標 準 程 序 , 肇 致 基 層 警 、 消 人 員 現 場 執 行 迭 生 爭 議 及 困 擾 , 確 有 未 當 :
1 、 按 消 防 法 第 二 十 六 條 規 定 : 「 直 轄 市 、 縣 ( 市 ) 消 防 機 關 , 為 調 查 、 鑑 定 火 災 原 因 , 得 派 員 進 入 有 關 場 所 勘 查 及 採 取 、 保 存 相 關 證 物 並 向 有 關 人 員 查 詢 。 火 災 現 場 在 未 調 查 鑑 定 前 , 應 保 持 完 整 , 必 要 時 得 予 封 鎖 。 」 同 法 施 行 細 則 第 二 十 六 條 規 定 : 「 檢 察 、 警 察 機 關 或 消 防 機 關 得 封 鎖 火 災 現 場 , 於 調 查 、 鑑 定 完 畢 後 撤 除 之 。 火 災 現 場 尚 未 完 成 調 查 、 鑑 定 者 , 應 保 持 現 場 狀 態 , 非 經 調 查 、 鑑 定 人 員 之 許 可 , 任 何 人 不 得 進 入 或 變 動 … … 」 惟 據 嘉 義 市 及 台 中 縣 等 消 防 局 反 映 略 以 : 「 目 前 國 內 現 行 火 災 原 因 調 查 制 度 中 , 關 於 火 災 現 場 封 鎖 , 大 部 分 均 由 消 防 單 位 執 行 , 但 其 撤 除 封 鎖 時 機 為 檢 察 官 之 職 權 … … 消 防 單 位 並 無 撤 銷 之 權 限 , 實 務 中 常 有 民 眾 要 求 消 防 單 位 撤 銷 封 鎖 , 以 便 清 理 火 災 現 場 , 甚 者 有 請 求 民 代 對 消 防 單 位 施 壓 , 致 消 防 單 位 不 堪 其 擾 … … 」 「 … … 火 災 案 件 事 涉 刑 法 公 共 危 險 罪 , 司 法 機 關 於 審 理 階 段 可 能 再 履 勘 現 場 , 故 消 防 機 關 不 敢 擅 專 准 予 災 戶 開 放 火 場 清 理 重 建 , 而 一 般 受 災 戶 均 急 於 清 理 火 場 重 建 家 園 , 但 消 防 、 警 察 機 關 均 無 任 何 依 據 准 予 開 放 火 場 , 致 生 災 戶 陳 情 、 民 代 關 切 不 斷 , 造 成 不 少 困 擾 。 故 上 揭 何 機 關 於 何 時 得 准 予 災 戶 開 放 火 場 之 問 題 , 實 有 探 討 、 明 定 之 必 要 , 以 符 實 務 上 的 需 求 。 」 顯 見 尚 未 完 成 調 查 鑑 定 之 火 災 現 場 , 雖 均 賦 予 消 防 機 關 或 檢 察 、 警 察 機 關 封 鎖 及 撤 銷 封 鎖 火 災
六 七
現 場 之 職 權 , 惟 地 方 消 防 機 關 、 警 察 機 關 對 於 封 鎖 及 撤 銷 作 業 , 卻 迭 生 疑 義 及 困 擾 , 究 其 原 因 , 實 乃 缺 乏 相 關 規 範 及 標 準 作 業 程 序 所 致 , 內 政 部 自 應 審 慎 研 議 檢 討 , 以 杜絕紛擾及爭議。 絕 紛 擾 及 爭 議 。
2 、 次 查 , 火 災 案 件 涉 及 刑 法 公 共 危 險 罪 , 各 級 法 院 於 審 理 階 段 可 能 有 必 要 再 履 勘 火 場 , 然 窺 諸 上 開 條 文 文 義 : 「 檢 察 、 警 察 機 關 或 消 防 機 關 得 封 鎖 火 災 現 場 , 於 調 查 、 鑑 定 完 畢 後 撤 除 之 」 是 火 災 現 場 之 封 鎖 及 撤 銷 封 鎖 係 檢 察 、 警 察 及 消 防 機 關 之 職 權 , 並 無 須 待 轄 管 法 院 同 意 , 肇 致 多 件 轄 管 法 院 審 理 火 災 案 件 函 請 消 防 署 重 新 鑑 定 時 , 該 署 均 以 「 火 場 已 遭 清 理 、 破 壞 , 致 相 關 跡 證 未 能 保 持 完 整 。 」 為 由 , 無 法 遂 行 再 鑑 定 任 務 , 此 觀 之 「 八 十 九 年 至 九 十 二 年 各 級 法 院 、 地 檢 署 所 委 託 重 新 調 查 、 鑑 定 覆 勘 現 場 之 火 災 案 件 計 七 十 八 件 , 僅 二 十 二 件 消 防 署 可 再 重 新 調 查 、 鑑 定 、 覆 勘 現 場 , 比 率 遠 不 及 二 八 ‧ 二 一 % 」 甚 明 , 除 造 成 法 院 審 理 之 困 擾 , 影 響 案 件 爭 點 之 釐 清 , 進 而 損 及 爭 訟 案 件 之 品 質 , 確 有 未 當 , 內 政 部 自 應 會 同 相 關 機 關 迅 謀 改 善 , 並 為 適 當 之 處 置 。
( 三 ) 消 防 署 未 落 實 依 法 行 政 , 怠 未 准 予 相 關 當 事 人 依 行 政 程 序 法 規 定 , 申 請 查 閱 火 災 原 因 調 查 報 告 書 , 有 違 行 政 資 訊 公 開 原 則 ; 對 於 民 眾 就 火 災 原 因 調 查 結 果 之 質 疑 、 不 服 及 不 滿 , 復 未 建 立 標 準 處 理 機 制 , 招 致 民 怨 , 損 及 政 府 形 象 , 顯 有 欠 當 :
1 、 按 「 行 政 行 為 應 遵 循 公 正 、 公 開 與 民 主 之 程 序 , 確 保 依 法 行 政 之 原 則 , 以 保 障 人 民 權 益 , 提 高 行 政 效 能 , 增 進 人 民 對 行 政 之 信 賴 。 」 乃 行 政 程 序 法 第 一 條 揭 櫫 之
六 八 立 法 精 神 。 該 法 為 行 政 機 關 行 政 行 為 之 陽 光 法 案 , 首 重 人 民 參 與 權 利 之 保 障 , 力 求 行 政 程 序 之 透 明 化 與 標 準 化 , 屬 現 代 民 主 化 的 法 典 , 標 榜 現 代 民 主 化 的 大 有 為 政 府 機 關 , 除 同 法 第 三 條 : 「 行 政 機 關 為 行 政 行 為 時 , 除 法 律 另 有 規 定 外 , 應 依 本 法 規 定 為 之 。 下 列 機 關 之 行 政 行 為 , 不 適 用 本 法 之 程 序 規 定 ︰ 一 、 各 級 民 意 機 關 。 二 、 司 法 機 關 。 三 、 監 察 機 關 。 下 列 事 項 , 不 適 用 本 法 之 程 序 規 定 ︰ 一 、 有 關 外 交 行 為 、 軍 事 行 為 或 國 家 安 全 保 障 事 項 之 行 為 … … 三 、 刑 事 案 件 犯 罪 偵 查 程 序 … … 」 所 稱排除適用之機關、事項及法律另有規定之外,均應奉為圭臬,力行 排 除 適 用 之 機 關 、 事 項 及 法 律 另 有 規 定 之 外 , 均 應 奉 為 圭 臬 , 力 行 不 悖 , 爰 無 權 自 行 選 擇 免 適 用 之 餘 地 。 同 法 第 四 十 二 條 亦 明 定 : 「 行 政 機 關 持 有 及 保 管 之 資 訊 , 以 公 開 為 原 則 , 限 制 為 例 外 ; 其 公 開 及 限 制 , 除 本 法 規 定 者 外 , 另 以 法 律 定 之 。 前 項 所 稱資訊,係指行政機關所持有或保管之文書、圖片、紀錄、 資 訊 , 係 指 行 政 機 關 所 持 有 或 保 管 之 文 書 、 圖 片 、 紀 錄 、 照 片 、 錄 影 ( 音 ) 、 微 縮 片 、 電 腦 處 理 資 料 等 , 可 供 聽 、 讀 、 閱 覽 或 藉 助 科 技 得 以 閱 讀 或 理 解 之 文 書 或 物 品 … … 」 第 四 十 五 條 規 定 : 「 行 政 機 關 持 有 或 保 管 之 下 列 資 訊 , 應 主 動 公 開 。 但 涉 及 國 家 機 密 者 , 不 在 此 限 … … 」 第 四 十 六 條 規 定 : 「 當 事 人 或 利 害 關 係 人 得 向 行 政 機 關 申 請 閱 覽 、 抄 寫 、 複 印 或 攝 影 有 關 資 料 或 卷 宗 。 但 以 主 張 或 維 護 其 法 律 上 利 益 有 必 要 者 為 限 … … 當 事 人 就 第 一 項 資 料 或 卷 宗 內 容 關 於 自 身 之 記 載 有 錯 誤 者 , 得 檢 具 事 實 證 明 , 請 求 相 關 機 關 更 正 。 」 是 消 防 機 關 既 屬 行 政 機 關 , 其 相 關 業 務 主 管 人 員 不 具 司 法 警 察 身 份 , 自 不 具 有 犯 罪 偵 查 權 , 其 所 為 之 火 災 調 查 鑑 定 程 序 及 撰 寫 之 火 災 原 因 調 查 報 告 書 , 自 屬 一 般 行 政 調 查 範 疇 ,
六 九
顯 非 屬 該 法 第 三 條 所 稱排除適用之對象及業務範圍,允應依上開 排 除 適 用 之 對 象 及 業 務 範 圍 , 允 應 依 上 開 規 定 及 程 序 , 准 依 火 災 案 件 當 事 人 或 利 害 關 係 人 之 申 請 , 予 以 閱 覽 、 抄 寫 、 複 印 或 攝 影 有 關 資 料 或 卷 宗 , 此 分 別 觀 之 相 關 文 獻 論 見 ( 詳 附 件 一 ) 略 謂 : 「 … … 當 事 人 於 行 政 程 序 中 , 有 申 請 調 查 事 實 及 證 據 的 權 利 … … 下 列 事 項 , 不 適 用 行 政 程 序 法 第 三 條 第 三 項 之 程 序 規 定 : … … 3 、 刑 事 案 件 犯 罪 偵 查 程 序 : 此 部 分 應 適 用 刑 事 訴 訟 法 的 規 定 , 不 適 用 行 政 程 序 法 。 然 所 謂 『 犯 罪 偵 查 程 序 』 , 包 括 檢 察 官 與 司 法 警 察 調 查 犯 罪 嫌 疑 人 犯 罪 情 形 及 蒐 集 證 據 的 程 序 。 雖 行 政 機 關 進 行 『 行 政 調 查 』 的 程 序 , 其 所 得 資 料 固 可 移 送 檢 察 官 偵 查 犯 罪 的 參 考 證 據 , 惟 亦 可 作 為 行 政 處 分 及 預 防 行 政 的 依 據 , 故 基 此 情 形 , 行 政 調 查 程 序 並 非 『 犯 罪 偵 查 程 序 』 , 似 仍 應 適 用 行 政 程 序 法 的 規 定 … … 例 如 政 風 處 調 查 公 務 員 風 紀 的 程 序 、 消 防 局 調 查 火 災 事 故 的 發 生 原 因 與 建 築 主 管 機 關 調 查 建 築 物 倒 塌 原 因 的 程 序 ( 包 括 委 託 技 師 公 會 鑑 定 ) 等 … … 」 、 「 … … 目 前 凡 有 車 禍發生,肇事雙方當事 發 生 , 肇 事 雙 方 當 事 人 皆 可 向 交 通 大 隊 申 請 交 通 肇 事 責 任 分 析 表 , 此 分 析 表 提 供 肇 事 原 因 之 鑑 定 以 及 責 任 之 分 析 … … 而 若 為 火 災 之 受 災 戶 或 致 縱 火 、 失 火 之 嫌 疑 人 , 消 防 單 位 卻 不 提 供 火 災 原 因 調 查 報 告 書 予 當 事 人 參 考 … … 火 災 原 因 調 查 報 告 書 為 單 純 之 原 因 鑑 定 報 告 , 並 不 影 響 刑 事 證 據 之 偵 蒐 、 保 全 , 自 應 無 悖 刑 法 第 二 百 四 十 五 條 偵 查 不 公 開 原 則 , 當 然 亦 不 足 以 妨 礙 被 告 受 公 正 之 裁 判 … … 火 災 調 查 原 因 報 告 書 無 涉 責 任 之 分 析 、 判 斷 , 自 應 更 無 不 提 供 當 事 人 參 考 之 理 … … 」 自 明 , 合
七 ○ 先 敘 明 。
2 、 惟 據 消 防 署 於 本 院 約 詢 前 查 復 表 示 略 以 : 「 … … 警 政 、 消 防 機 關 分 隸 後 , 消 防 機 關 係 被 歸 屬 於 行 政 機 關 , 消 防 人 員 不 具 有 司 法 警 察 人 員 資 格 … … 民 眾 無 法 查 閱 火 災 原 因 調 查 報 告 書 , 且 消 防 機 關 目 前 僅 有 依 法 製 作 報 告 書 之 義 務 , 但 卻 無 公 開 之 權 限 , 致 民 眾 對 承 辦 火 災 原 因 調 查 、 鑑 定 之 消 防 機 關 , 多 有 責 難 , 實 有 欠 公 允 ! 」 足 見 消 防 機 關 竟 未 准 予 相 關 當 事 人 依 行 政 程 序 法 規 定 , 申 請 查 閱 火 災 原 因 調 查 報 告 書 之 內 容 , 顯 剝 奪 當 事 人 依 法 享 有 之 權 利 , 與 行 政 資 訊 公 開 原 則 有 違 , 自 不 免 招 致 民 怨 。
3 、 雖 消 防 署 於 本 院 約 詢 後 補 充 說 明 略 謂 : 「 … … 民 眾 如 對 火 災 調 查 、 鑑 定 內 容 有 所 質 疑 或 不 滿 意 時 , 可 循 刑 法 、 刑 事 訴 訟 法 規 定 之 司 法 途 徑 , 提 出 對 自 身 有 利 之 證 據 , 並 請 求 法 官 或 檢 察 官 裁 定 再 次 調 查 、 鑑 定 … … 」 並 引 用 法 務 部 九 十 三 年 三 月 十 七 日 法 檢 字 第 ○ 九 三 ○ ○ ○ 八 ○ 六 九 號 函 釋 略 以 : 「 … … 火 災 原 因 調 查 報 告 書 於 進 入 刑 事 偵 查 階 段 , 係 追 訴 失 火 罪 或 縱 火 罪 的 重 要 證 據 資 料 , 二 罪 均 屬 嚴 重 侵 害 社 會 法 益 之 犯 罪 。 且 因 火 災 現 場 跡 證 , 在 偵 查 程 序 完 成 前 仍 有 保 全 之 必 要 , 亦 與 交 通 車 禍案件單純在 案 件 單 純 在 確 定 二 造 間 為 責 任 認 定 並 不 相 同 , 火 災 原 因 調 查 報 告 書 與 交 通 肇 事 責 任 分 析 表 在 性 質 與 作 用 上 均 不 相 同 , 前 者 並 不 適 於 比 照 後 者 在 偵 查 中 任 意 公 開 … … 」 惟 當 事 人 如 俟 轄 管 法 院 審 理 火 災 案 件 時 , 方 可 查 閱 火 災 原 因 調 查 報 告 書 內 容 , 以 消 防 機 關 、 警 察 機 關 封 鎖 作 業 不 切 實 及 迄 未 建 立 橫 向 標 準 作 業 程 序 以 觀
七 一
( 詳 調 查 意 見 二 之 ( 二 ) ) , 斯 時 火 災 現 場 往 往 已 遭 破 壞 , 倘 有 所 質 疑 不 服 時 , 顯 已 喪 失 提 出 對 自 身 有 利 證 據 之 先 機 , 此 觀 之 消 防 署 自 承 : 「 … … 火 災 案 件 當 事 人 不 服 火 災 調 查 結 果 時 , 因 火 災 現 場 相 關 痕 跡 、 跡 證 均 已 清 理 , 無 法 由 縣 市 政 府 火 災 鑑 定 委 員 會 再 單 獨 處 理 火 災 案 件 之 調 查 、 鑑 定 … … 」 甚 明 。 況 火 災 案 件 所 涉 犯 罪 偵 查 等 刑 事 證 據 之 偵 蒐 、 保 全 , 司 法 警 察 、 檢 調 機 關 責 無 旁 貸 , 其 偵 查 所 為 之 相 關 文 書 , 方 有 刑 法 第 二 百 四 十 五 條 偵 查 不 公 開 規 定 之 適 用 , 而 火 災 原 因 調 查 報 告 書 內 容 雖 攸 關 後 續 司 法 機 關 釐 定 刑 事 、 民 事 責 任 之 重 要 參 考 依 據 , 惟 其 仍 屬 行 政 調 查 範 疇 , 自 應 遵 守 行 政 資 訊 公 開 原 則 , 且 火 災 調 查 原 因 報 告 書 內 容 既 僅 為 起火 火 戶 、 處 及 起火原因之判斷,無涉相關責任之分析、判斷,此參照地方消防機關之 火 原 因 之 判 斷 , 無 涉 相 關 責 任 之 分 析 、 判 斷 , 此 參 照 地 方 消 防 機 關 之 說 明 : 「 … … 應 釐 清 行 政 調 查 與 司 法 調 查 權 限 之 關 係 : 政 府 各 機 關 各 有 其 專 業 、 權 限 、 功 能 與 目 的 , 而 消 防 機 關 火 災 原 因 調 查 之 結 果 , 係 提 供 火 災 預 防 管 理 及 行 政 措 施 之 參 考 , 與 司 法 調 查 之 刑 事 偵 查 工 作 , 是 追 究 火 災 責 任 之 參 考 , 彼 此 業 務 權 責 應 能 確 認 … … 」 及 就 「 交 通 肇 事 責 任 分 析 表 含 有 當 事 人 雙 方 之 責 任 鑑 定 , 即 使 車 禍事故致人死傷涉及刑法上之殺人罪或傷害罪,交通單位仍提供雙方當事人以 事 故 致 人 死 傷 涉 及 刑 法 上 之 殺 人 罪 或 傷 害 罪 , 交 通 單 位 仍 提 供 雙 方 當 事 人 以 為 責 任 釐 清 之 參 考 」 以 觀 , 消 防 機 關 允 無 不 提 供 當 事 人 參 考 之 理 。 況 法 務 部 上 開 函 件 所 稱「進入刑事偵查階段」,當指火災原因調查報告書移送警察機關後,警察 「 進 入 刑 事 偵 查 階 段 」 , 當 指 火 災 原 因 調 查 報 告 書 移 送 警 察 機 關 後 , 警 察 機 關 之 犯 罪 偵 查 階 段 , 而 消 防 機 關 火 災 原 因 調 查 報 告 書 未 移 送 前 , 自 應 依 法 提 供 當 事 人 參 考 , 綜 合 情 、 理 、 法 各 層 面 , 在 在 顯 示 消 防 機 關 上 開 陳 詞 , 未 能 究 明 法
七 二 理 藉 辭 諉 責 , 而 剝 奪 相 關 當 事 人 依 法 享 有 之 權 利 , 洵 有 欠 當 。
4 、 況 查 「 交 通 事 故 鑑 定 結 果 如 當 事 人 不 服 者 , 可 提 縣 市 政 府 行 車 事 故 鑑 定 委 員 會 裁 決 」 之 機 制 及 參 照 九 十 二 年 經 濟 部 投 資 業 務 處 、 台 灣 外 貿 發 展 協 會 高 雄 辦 事 處 、 財 團 法 人 海 峽 交 流 基 金 會 主 辦 之 兩 岸 經 貿 講 座 , 其 中 有 關 「 如 何 正 確 處 理 大 陸 企 業 工 廠 危 安 事 件 」 主 題 內 容 ( 詳 附 件 一 ) 略 以 : 「 … … 大 陸 公 安 消 防 機 構 應 根 據 火 災 現 場 詢 問 、 現 場 勘 查 、 技 術 鑑 定 等 調 查 情 況 , 作 出 火 災 原 因 認 定 , 製 作 火 災 原 因 認 定 書 。 該 認 定 書 自 作 出 之 日 起七日內送達有關當事人(所謂當事人,是指與 七 日 內 送 達 有 關 當 事 人 ( 所 謂 當 事 人 , 是 指 與 火 災 原 因 認 定 和 火 災 事 故 責 任 認 定 有 直 接 利 害 關 係 的 單 位 和 個 人 ) 。 若 是 台 商 未 在 法 定 時 間 內 收 到 認 定 書 , 一 定 要 主 動 向 公 安 消 防 機 構 索 取 。 台 商 對 火 災 原 因 、 火 災 事 故 責 任 認 定 不 服 的 , 自 收 到 該 認 定 書 之 日 起十五日內,可向火災事故發生地 十 五 日 內 , 可 向 火 災 事 故 發 生 地 主 管 公 安 機 關 或 者 一 級 公 安 消 防 機 構 申 請 重 新 認 定 … … 」 是 我 國 政 府 機 關 既 自 許 為 民 主 先 進 之 國 家 , 較 之 中 國 大 陸 已 然 建 立 火 災 案 件 當 事 人 不 服 之 復 審 救 濟 制 度 , 消 防 署 迄 未 建 立 任 何 標 準 處 理 機 制 , 顯 欠 允 當 。 以 各 市 、 縣 政 府 火 災 鑑 定 委 員 會 功 能 不 彰 等 情 以 觀 ( 詳 調 查 意 見 一 之 ( 二 ) ) , 消 防 機 關 建 立 上 開 復 審 救 濟 制 度 , 已 刻 不 容 緩 , 內 政 部 應 督 促 消 防 署 積 極 妥 處 , 俾 疏 民 怨 。
( 四 ) 高 雄 縣 、 屏 東 縣 等 消 防 局 疏 未 落 實 消 防 法 施 行 細 則 第 二 十 五 條 規 定 , 擅 將 未 成 災 火 災 案 件 之 火 災 原 因 調 查 報 告 書 逕 行 存 檔 備 查 , 核 有 違 失 :
按 「 直 轄 市 、 縣 ( 市 ) 消 防 機 關 調 查 、 鑑 定 火 災 原 因 後 , 應 即 製 作 火 災 原 因 調
七 三
查 報 告 書 , 移 送 當 地 警 察 機 關 依 法 處 理 。 」 消 防 法 施 行 細 則 第 二 十 五 條 定 有 明 文 。 消 防 署 訂 定 發 布 之 火 災 原 因 調 查 實 施 要 點 陸 、 報 告 書 製 作 規 定 之 一 及 火 災 原 因 調 查 報 告 書 分 級 列 管 實 施 規 定 亦 分 別 明 定 : 「 火 災 不 論 成 災 與 否 , 應 由 火 災 調 查 人 員 即 刻 前 往 現 場 勘 查 , 並 撰 寫 火 災 原 因 調 查 報 告 書 。 」 、 「 火 災 原 因 調 查 報 告 書 製 作 完 畢 , 移 送 當 地 警 察 分 局 時 , 有 財 物 損 失 或 有 人 員 傷 亡 案 件 , 由 局 本 部 審 查 列 管 ; 重 大 災 害 案 件 , 各 消 防 機 關 除 自 行 留 存 一 份 外 , 應 副 陳 消 防 署 列 管 … 」 是 各 直 轄 市 、 縣 市 消 防 機 關 對 於 轄 區 火 災 案 件 , 均 應 製 作 火 災 原 因 調 查 報 告 書 , 並 移 送 當 地 警 察 機 關 處 理 , 爰 無 得 因 未 成 災 而 選 擇 免 移 送 警 察 機 關 之 裁 量 餘 地 。 惟 查 , 高 雄 縣 及 屏 東 縣 等 消 防 局 對 於 轄 區 未 成 災 之 火 災 案 件 , 竟 擅 將 未 成 災 之 原 因 不 明 火 災 案 件 逕 存 檔 備 查 , 顯 與 上 開 規 定 有 違 , 此 觀 之 該 二 消 防 局 之 說 明 : 「 原 因 不 明 案 件 若 為 成 災 、 有 糾 紛 或 屬 重 大 案 件 則 移 送 警 察 分 局 辦 理 , 不 成 災 案 件 則 建 檔 備 查 。 」 甚 明 , 核 有 違 失 。
( 五 ) 消 防 署 怠 未 建 立 標 準 作 業 規 範 及 程 序 , 致 八 十 七 年 十 月 十 九 日 桃 園 縣 龜 山 工 業 區 內 來 緯 實 業 股 份 有 限 公 司 ( 下 禒 來 緯 公 司 ) 及 四 維 企 業 股 份 有 限 公 司 ( 下 禒 四 維 公 司 ) 火 災 原 因 之 重 新 調 查 鑑 定 作 業 屢 生 諸 多 缺 漏 及 疏 失 , 致 遭 外 力 介 入 之 質 疑 ; 對 於 前 後 鑑 定 結 果 殊 異 之 原 因 , 迄 未 究 明 釐 清 , 招 致 陳 情 、 質 疑 、 詬 病 不 斷 , 洵 有 重 大 違 失 :
1 、 據 消 防 署 查 復 資 料 , 八 十 七 年 十 月 十 九 日 三 時 十 四 分 桃 園 縣 龜 山 工 業 區 內 來 緯 公 司 及 四 維 公 司 發 生 五 人 死 亡 、 四 人 輕 重 傷 之 重 大 火 災 事 故 ( 下 稱本案),財物損失 本 案 ) , 財 物 損 失
七 四 約 計 新 台 幣 三 億 五 千 萬 元 , 案 經 桃 園 縣 警 察 局 ( 下 稱縣警察局)消防隊 縣 警 察 局 ) 消 防 隊 ( 現 改 制 為 桃 園 縣 消 防 局 【 下 稱縣消防局】 縣 消 防 局 】 ) 調 查 火 災 原 因 並 簽 請 縣 府 召 開 火 災 鑑 定 委 員 會 , 分 別 於 同 年 月 二 十 三 日 、 二 十 九 日 及 十 一 月 四 日 履 勘 現 場 , 嗣 於 同 年 月 十 一 月 二 十 日 、 十 二 月 八 日 及 八 十 八 年 一 月 十 四 日 召 開 會 議 討 論 案 情 , 參 與 會 議 之 專 家 學 者 有 中 央 警 察 大 學 施 教 授 多 喜 、 陳 教 授 火 炎 、 陳 教 授 金 蓮 、 黃 教 授 伯 全 及 黃 教 授 敬 德 , 機 關 代 表 除 縣 警 察 局 相 關 主 管 人 員 外 , 消 防 署 亦 派 陳 前 科 長 群 應 、 廖 前 視 察 茂 為 、 王 前 科 員 靜 婷 、 朱 前 技 士 少 龍 、 吳 技 士 靜 茹 會 同 縣 消 防 局 現 勘 調 查 或 列 席 會 議 討 論 。 嗣 經 縣 消 防 局 於 八 十 八 年 二 月 四 日 完 成 火 災 原 因 調 查 報 告 書 , 並 以 桃 消 調 字 第 一 一 ○ 九 六 號 函 請 縣 警 察 局 移 送 台 灣 桃 園 地 方 法 院 ( 下 稱桃園地院) 桃 園 地 院 ) 檢 察 署 ( 下 稱 桃 園 地 檢 署 ) 續 行 偵 辦 。 該 鑑 定 結 論如下:起火戶 火 戶 ( 處 ) 為 來 緯 公 司 一 樓 東 側 中 央 一 端 及 四 維 公 司 後 側 化 工 原 料 倉 庫 旁 違 建 倉 庫 前 端 附 近 、 起火原因 火 原 因 不 明 。 案 經 桃 園 地 檢 署 偵 查 時 , 認 縣 消 防 局 前 開 鑑 定 報 告 尚 有 疑 點 , 乃 於 同 年 五 月 二 十 日 以 桃 檢 楠 來 八 七 相 字 第 一 五 一 八 號 函 請 消 防 署 協 助 調 查 鑑 定 火 災 原 因 , 經 消 防 署 分 別 於 同 年 月 二 十 四 日 、 六 月 四 日 、 十 四 日 會 同 承 辦 檢 察 官 重 新 勘 驗 火 災 現 場 , 於 同 年 七 月 二 十 三 日 將 現 場 勘 查 情 形 及 調 查 報 告 等 資 料 以 消 署 調 字 第 八 八 I ○ 一 一 ○ 號 函 送 桃 園 地 檢 署 參 辦 。 該 第 二 次 鑑 定 結 論 略 以 : 起火戶(處)為 火 戶 ( 處 ) 為 來 緯 公 司 二 樓 東 面 一 號 定 型 機 編 號 第 二 根 至 第 四 根 柱 子 機 器 附 近 , 起火原因列出 火 原 因 列 出 五 種可能原因,但實際原因不明。由上可知,消防署第二次鑑定結果與縣消防局 可 能 原 因 , 但 實 際 原 因 不 明 。 由 上 可 知 , 消 防 署 第 二 次 鑑 定 結 果 與 縣 消 防 局
七 五
第 一 次 鑑 定 結 果 迥 異 , 惟 消 防 署 二 次 鑑 定 均 曾 參 與 之 承 辦 業 務 主 管 人 員 , 竟 未 檢 附 縣 消 防 局 第 一 次 鑑 定 報 告 , 毫 未 比 較 說 明 前 後 二 次 研 判 原 因 、 採 證 之 取 捨 依 據 、 推 論 之 邏 輯 等 相 異 之 理 由 , 即 以 有 別 於 第 一 次 鑑 定 結 果 之 調 查 報 告 , 率 以 稿 代 簽 陳 核 函 送 桃 園 地 檢 署 , 此 有 消 防 署 督 察 科 八 十 九 年 十 月 十 七 日 內 部 查 核 簽 呈 在 卷 足 稽 , 是 否 因 受 外 力 或 壓 力 而 形 成 該 等 過 程 及 結 果 , 不 無 啟 人 疑 竇 ; 對 於 上 開 前 後 鑑 定 結 果 殊 異 之 原 因 , 迄 未 究 明 釐 清 , 均 顯 有 欠 當 。
2 、 消 防 署 嗣 依 據 來 緯 公 司 同 年 九 月 十 日 陳 情 書 , 由 陳 前 署 長 弘 毅 指 示 黃 前 副 署 長 季 敏 率 同 施 教 授 多 喜 、 陳 教 授 金 蓮 、 消 防 署 、 台 北 市 政 府 消 防 局 ( 下 稱市消防局)、 市 消 防 局 ) 、 縣 消 防 局 等 相 關 人 員 , 分 別 於 同 年 月 十 六 日 、 二 十 日 、 十 月 四 日 、 五 日 、 八 日 再 赴 現 場 勘 查 , 以 釐 清 該 公 司 所 提 疑 點 。 同 年 十 月 三 日 , 消 防 署 嗣 接 獲 地 檢 署 起訴 訴 書 , 乃 於 同 年 十 一 月 三 日 以 八 十 八 消 署 調 字 第 八 八 I ○ 一 五 一 號 函 復 陳 情 人 略 以 : 「 為 求 慎 重 , 經 該 署 黃 前 副 署 長 率 相 關 機 關 人 員 及 專 家 學 者 分 別 進 行 五 次 現 場 履 勘 … … 迄 同 年 十 月 十 四 日 該 署 甫 接 獲 桃 園 地 院 針 對 該 案 之 起訴書, 訴 書 , 由 於 全 案 已 進 入 司 法 程 序 , 建 請 來 緯 公 司 循 司 法 途 徑 辦 理 。 」 桃 園 地 院 承 審 法 官 黃 永 定 嗣 於 八 十 九 年 三 月 十 三 日 委 請 消 防 署 於 同 年 月 二 十 二 日 勘 驗 現 場 並 重 新 鑑 定 , 以 究 真 相 。 經 消 防 署 鑒 於 上 揭 二 份 鑑 定 報 告 內 容 迥 異 , 經 排 除 縣 消 防 局 及 消 防 署 曾 參 與 勘 查 之 人 員 , 另 成 立 專 案 小 組 , 仍 由 施 教 授 多 喜 擔 任 召 集 人 , 並 邀 集 勞 委 會 等 相 關 機 關 薦 派 相 關 專 家 成 立 專 案 小 組 , 以 協 助 調 查 鑑 定 原 因 。 歷 經 八 十 九 年 四 月 間
七 六 之 數 次 現 場 勘 查 、 五 月 及 六 月 間 數 次 開 會 討 論 、 六 月 間 再 分 別 多 次 召 集 原 先 參 與 調 查 鑑 定 之 人 員 交 叉 討 論 等 過 程 , 因 與 會 人 員 各 持 不 同 看 法 , 未 獲 具 體 結 論 , 且 斯 時 因 立 法 委 員 函 該 部 張 前 部 長 博 雅 , 涉 有 對 專 案 小 組 召 集 人 施 教 授 多 喜 人 身 攻 擊 , 且 質 疑 專 案 小 組 之 公 正 、 客 觀 性 , 為 避 免 專 案 小 組 受 質 疑 , 小 組 成 員 認 為 對 現 場 勘 查 明 確 之 痕 跡 、 物 證 … … 等 已 相 當 明 確 客 觀 之 物 證 進 行 確 認 分 析 , 已 足 以 瞭 解 初 期 火 災 燃 燒 狀 況 及 位 置 , 乃 於 八 十 九 年 十 月 三 十 一 日 將 上 揭 相 關 資 料 以 消 署 調 字 第 八 九 一 一 六 七 九 號 函 送 桃 園 地 院 參 辦 。 該 院 嗣 再 函 請 消 防 署 於 九 十 年 八 月 二 十 四 日 、 十 二 月 二 十 五 日 派 員 至 現 場 履 勘 及 說 明 , 消 防 署 則 請 原 承 辦 人 員 出 席 。 至 台 灣 高 等 法 院 因 對 前 開 二 件 報 告 完 全 不 同 之 鑑 定 結 果 , 無 以 裁 量 , 乃 於 九 十 二 年 八 月 七 日 以 院 田 刑 忠 字 第 一 一 六 ○ 二 號 函 , 再 次 函 請 消 防 署 組 成 專 案 小 組 協 助 調 查 鑑 定 ; 經 消 防 署 召 開 九 十 二 年 間 方 成 立 之 火 災 鑑 定 委 員 會 審 閱 相 關 卷 證 資 料 , 並 開 會 討 論 後 , 認 本 案 所 提 供 法 院 參 酌 之 火 災 現 場 初 期 燃 燒 狀 況 錄 影 帶 、 現 場 痕 跡 、 物 證 、 消 防 搶 救 人 員 對 初 期 燃 燒 狀 況 之 談 話 筆 錄 等 資 料 均 已 非 常 明 確 , 加 以 現 場 相 關 跡 證 多 已 不 復 存 在 , 故 依 大 多 數 委 員 意 見 , 消 防 署 不 再 組 成 專 案 小 組 勘 驗 現 場 , 並 建 議 高 等 法 院 倘 仍 有 疑 義 , 傳 喚 原 調 查 鑑 定 人 員 到 庭 說 明 。 是 消 防 署 針 對 本 火 災 案 件 , 計 曾 辦 理 五 次 、 每 次 安 排 多 日 現 勘 火 災 現 場 之 重 新 調 查 鑑 定 , 其 中 第 一 次 、 第 二 次 、 第 四 次 、 第 五 次 係 分 別 配 合 桃 園 地 檢 署 及 桃 園 地 院 之 偵 查 及 審 理 作 業 , 惟 第 三 次 竟 非 依 司 法 機 關 之 要 求 , 而 係 主 動 依 陳 情 人 所 請 , 顯
七 七
有 違 消 防 署 所 稱重新調查鑑定之要件:「 重 新 調 查 鑑 定 之 要 件 : 「 司 法 機 關 ( 法 院 或 地 檢 署 ) 重 新 委 託 調 查 、 鑑 定 者 。 」 顯 有 欠 當 。 又 上 開 五 次 重 新 調 查 鑑 定 作 業 , 其 中 有 同 時 勘 查 現 場 及 開 會 討 論 者 、 有 僅 勘 查 現 場 而 未 開 會 討 論 者 、 有 僅 開 會 討 論 而 未 勘 查 現 場 者 、 有 開 會 討 論 而 未 獲 結 論 者 、 有 學 者 一 再 擔 任 召 集 人 者 、 有 部 分 機 關 前 段 參 與 、 後 段 未 受 邀 、 部 分 機 關 前 段 未 參 與 、 後 段 方 加 入 者 , 顯 見 重 新 調 查 鑑 定 作 業 程 序 、 方 式 及 邀 集 參 與 之 單 位 不 一 , 何 時 應 依 司 法 機 關 所 請 派 員 現 勘 ? 何 時 不 需 現 勘 , 開 會 討 論 即 可 ? 開 會 未 獲 結 論 如 何 處 理 ? 等 等 疑 義 , 均 缺 乏 標 準 作 業 規 範 及 程 序 , 肇 致 人 為 主 觀 控 制 及 介 入 的 因 素 增 加 , 招 致 外 界 質 疑 及 詬 病 不 斷 , 此 除 觀 之 消 防 署 針 對 案 內 查 復 資 料 所 附 數 位 立 法 委 員 之 囑 託 、 質 疑 函 件 、 電 話 詢 問 及 相 關 當 事 人 多 次 陳 情 書 甚 明 , 亦 可 由 屏 東 縣 、 嘉 義 縣 、 市 、 雲 林 縣 、 南 投 縣 、 彰 化 縣 、 台 中 市 、 新 竹 縣 、 市 、 桃 園 縣 、 基 隆 市 、 嘉 義 縣 、 市 、 花 蓮 縣 、 屏 東 縣 等 消 防 局 之 查 復 說 明 : 「 消 防 署 並 未 對 火 災 原 因 重 新 調 查 鑑 定 作 業 , 訂 定 相 關 標 準 作 業 程 序 。 」 足 資 印 證 , 確 有 未 當 。 內 政 部 基 於 主 管 機 關 , 自 應 切 實 就 上 開 各 項 疑 點 切 實 查 明 究 責 見 復 。
三 、 火 災 原 因 調 查 結 果 正 確 性 堪 慮 , 公 信 力 不 足 , 屢 遭 詬 病 :
( 一 ) 消 防 署 怠 於 監 督 , 致 地 方 消 防 機 關 怠 未 落 實 火 災 原 因 調 查 實 施 要 點 之 規 定 , 究 明 火 災 原 因 , 洵 有 未 當 :
1 、 按 消 防 署 訂 定 發 布 之 火 災 原 因 調 查 實 施 要 點 伍 、 補 充 調 查 規 定 : 「 一 、 對 於 現 場 無
七 八 法 立 即 研 判 起火原因或可供判斷之資料不充分時, 火 原 因 或 可 供 判 斷 之 資 料 不 充 分 時 , 應 進 行 補 充 調 查 聽 取 關 係 人 之 詳 細 供 述 , 並 實 施 鑑 定 、 實 驗 或 文 獻 證 明 。 二 、 實 施 補 充 調 查 仍 有 疑 難 時 , 應 召 集 火 災 鑑 定 委 員 會 委 員 至 現 場 協 助 調 查 後 , 召 開 諮 詢 會 議 , 協 助 調 查 、 鑑 定 火 災 原 因 … … 」 是 各 消 防 機 關 對 於 轄 區 火 災 案 件 , 允 應 依 上 開 規 定 程 序 善 盡 補 充 調 查 之 能 事 , 以 究 明 火 災 發 生 原 因 , 倘 完 備 所 有 程 序 仍 未 能 判 定 火 災 原 因 , 方 歸 類 於 原 因 不 明 案 件 , 始 符 合 調 查 鑑 定 作 為 所 要 求 之 追 根 究 底 、 明 察 秋 毫 之 勿 枉 勿 縱 精 神 , 合 先 敘 明 。
2 、 依 據 消 防 署 及 各 直 轄 市 、 縣 市 消 防 局 查 復 統 計 資 料 , 近 十 ( 八 十 三 至 九 十 二 ) 年 各 直 轄 市 、 縣 市 火 災 原 因 不 明 案 件 數 , 分 別 為 基 隆 市 一 八 件 、 台 北 市 一 五 七 件 、 台 北 縣 四 二 件 、 桃 園 縣 八 ○ 二 件 、 新 竹 縣 二 三 一 件 、 新 竹 市 四 ○ 件 、 苗 栗 縣 二 一 一 件 、 台 中 縣 三 ○ 六 件 、 台 中 市 八 六 件 、 彰 化 縣 七 九 六 件 、 南 投 縣 一 、 一 三 八 件 、 雲 林 縣 三 九 九 件 、 嘉 義 縣 二 四 八 件 、 嘉 義 市 六 件 、 台 南 市 一 三 四 件 、 台 南 縣 一 六 ○ 件 、 高 雄 縣 三 ○ 一 件 、 高 雄 市 四 三 件 、 宜 蘭 縣 九 二 件 、 花 蓮 縣 一 ○ 六 件 、 台 東 縣 一 一 七 件 、 屏 東 縣 四 四 三 件 、 金 門 縣 八 件 、 澎 湖 縣 六 件 、 連 江 縣 四 三 件 。 卷 查 上 開 不 明 原 因 之 火 災 案 件 , 除 台 北 市 等 少 數 市 縣 消 防 局 外 , 其 餘 縣 市 消 防 局 竟 未 踐 行 前 揭 補 充 調 查 程 序 , 僅 由 消 防 局 火 災 調 查 課 人 員 調 查 , 在 未 召 集 火 災 鑑 定 委 員 會 委 員 至 現 場 協 助 調 查 , 召 開 諮 詢 會 議 前 , 即 逕 判 定 為 原 因 不 明 案 件 , 顯 未 善 盡 補 充 調 查 、 究 明 真 相 之 能 事 , 與 上 開 規 定 有 違 , 洵 有 未 當 。 據 基 隆 市 、 新 竹 縣 、
七 九
新 竹 市 、 台 中 市 、 南 投 縣 、 雲 林 縣 等 消 防 局 表 示 : 「 消 防 署 針 對 原 因 不 明 火 災 案 件 之 處 理 , 並 無 相 關 規 定 及 要 求 事 項 。 」 云 云 , 足 見 該 等 消 防 局 竟 對 上 開 補 充 調 查 程 序 之 規 定 , 毫 無 所 悉 , 消 防 署 怠 於 監 督 , 顯 難 辭 其 咎 。
( 二 ) 消 防 署 監 督 不 力 , 致 地 方 消 防 機 關 疏 未 落 實 相 關 規 定 , 肇 致 火 災 原 因 調 查 報 告 書 之 撰 寫 , 失 之 草 率 , 核 有 未 當 :
按 火 災 調 查 鑑 定 之 標 準 作 業 程 序 及 調 查 報 告 書 之 格 式 、 內 容 , 消 防 署 八 十 四 年 十 一 月 十 七 日 消 署 調 字 第 八 四 五 一 ○ 二 一 號 函 發 布 之 火 災 原 因 調 查 報 告 書 製 作 規 定 、 八 十 九 年 八 月 二 十 四 日 八 九 同 字 第 八 九 一 ○ 一 四 三 號 函 發 布 之 火 災 原 因 調 查 實 施 要 點 及 同 年 九 月 十 四 日 同 字 第 八 九 ○ 一 三 七 號 函 發 布 之 火 災 原 因 調 查 標 準 作 業 程 序 , 定 有 明 文 , 地 方 消 防 機 關 自 應 切 實 遵 守 。 惟 經 本 院 彙 整 本 院 相 關 案 件 調 查 所 得 , 並 研 閱 司 法 機 關 委 請 消 防 機 關 重 新 調 查 鑑 定 之 火 災 案 件 , 發 現 諸 多 縣 市 消 防 局 疏 未 落 實 相 關 規 定 , 致 火 災 原 因 調 查 報 告 書 之 撰 寫 , 失 之 草 率 , 除 斲 傷 政 府 公 信 力 外 , 亦 損 及 相 關 當 事 人 權 益 , 並 造 成 司 法 機 關 審 理 案 件 之 困 擾 , 此 觀 之 消 防 署 自 承 : 「 各 級 法 院 於 審 理 時 , 法 官 、 火 災 案 件 當 事 人 往 往 會 質 疑 縣 市 消 防 局 調 查 結 果 之 完 整 性 及 正 確 性 , 故 常 函 請 消 防 署 協 助 並 重 新 調 查 鑑 定 … … 」 甚 明 , 核 有 未 當 , 消 防 署 自 難 辭 監 督 不 力 之 責 。 茲 分 述 如 下 :
1 、 司 法 機 關 因 地 方 消 防 機 關 火 災 原 因 調 查 報 告 書 撰 寫 疏 漏 、 草 率 , 委 請 消 防 署 重 新 調 查 、 鑑 定 部 分 :
八 ○ ( 1 ) 八 十 八 年 八 月 六 日 十 時 三 十 五 分 台 北 縣 樹 林 鎮 備 內 街 光 明 巷 一 之 九 號 及 十 一 號 住 宅 火 災 案 , 台 北 縣 消 防 局 撰 寫 之 火 災 原 因 調 查 報 告 書 存 有 缺 失 如 下 : 二 起火 火 戶 間 之 延 燒 關 係 、 起火處之說明及採證照片,均不甚明確、未對關鍵之電源開 火 處 之 說 明 及 採 證 照 片 , 均 不 甚 明 確 、 未 對 關 鍵 之 電 源 開 關 箱 跳 脫 情 形 、 電 源 線 迴 路 關 係 及 短 路 痕 電 源 線 特 寫 或 進 一 步 鑑 定 分 析 等 , 此 觀 之 消 防 署 九 十 一 年 五 月 二 十 四 日 消 署 調 字 第 九 一 ○ ○ ○ 七 ○ 一 七 號 函 自 明 。
( 2 ) 八 十 九 年 四 月 十 九 日 彰 化 縣 北 斗 鎮 中 華 路 二 一 四 號 儷 之 舫 美 髮 店 火 災 案 , 彰 化 縣 消 防 局 撰 寫 之 火 災 原 因 調 查 報 告 書 存 有 缺 失 如 下 : 對 於 疑 似 縱 火 用 具 「 寶 特 瓶 」 上 之 潛 伏 指 紋 , 除 未 進 一 步 鑑 定 , 證 物 寶 特 瓶 亦 未 加 以 保 存 , 阻 礙 犯 罪 事 實 之 認 定 , 此 分 別 有 台 灣 彰 化 地 方 法 院 九 十 年 十 一 月 二 十 七 日 彰 院 松 刑 末 九 十 訴 五 一 字 第 四 四 一 三 八 號 函 、 彰 化 縣 消 防 局 同 年 月 十 六 日 ( 九 十 ) 彰 調 字 第 ○ 七 三 五 四 號 函 及 消 防 署 同 年 十 二 月 六 日 內 部 簽 呈 在 卷 足 稽 。
( 3 ) 九 十 一 年 七 月 二 十 八 日 四 時 五 分 彰 化 縣 花 壇 鄉 文 德 村 宏 宅 街 一 六 七 號 、 一 六 九 號 住 宅 火 災 案 , 彰 化 縣 消 防 局 撰 寫 之 火 災 原 因 調 查 報 告 書 存 有 缺 失 如 下 : 對 於 起 火 處 位 置 及 高 度 , 未 切 實 詢 問 關 係 人 、 對 於 可 能 之 電 氣 因 素 未 具 體 分 析 、 起 火 原 因 研 判 不 合 邏 輯 、 相 互 矛 盾 、 未 將 起火處之證物重建及復原,此有消防署 火 處 之 證 物 重 建 及 復 原 , 此 有 消 防 署 九 十 二 年 ○ 九 二 ○ ○ ○ ○ 八 三 六 函 在 卷 可 稽 。
( 4 ) 九 十 一 年 八 月 一 日 十 六 時 十 六 分 嘉 義 市 竹 文 里 北 興 街 三 十 一 巷 十 三 號 等 四 棟 住 宅 戶 火 災 案 , 嘉 義 市 消 防 局 撰 寫 之 火 災 原 因 調 查 報 告 書 存 有 缺 失 如 下 : 未 分 析
八 一
起 火處附近之延燒關係、未檢附清理現場之照 火 處 附 近 之 延 燒 關 係 、 未 檢 附 清 理 現 場 之 照 片 , 此 有 消 防 署 九 十 二 年 一 月 十 三 日 消 署 字 第 ○ 九 一 ○ ○ 二 一 八 一 六 號 函 在 卷 可 稽 。
( 5 ) 九 十 一 年 十 月 三 十 日 台 中 縣 烏 日 鄉 九 德 村 中 山 路 一 段 四 六 二 號 住 宅 火 災 案 , 台 中 縣 消 防 局 撰 寫 之 火 災 原 因 調 查 報 告 書 存 有 缺 失 如 下 : 未 敘 明 清 理 起火處,以 火 處 , 以 確 認 現 場 有 否 遺 留 煙 頭 或 排 除 其 他 可 能 原 因 , 此 觀 之 消 防 署 九 十 二 年 七 月 一 日 內 部 簽 呈 甚 明 。
2 、 本 院 相 關 案 件 調 查 發 現 之 缺 失 部 分 :
本 院 九 十 二 年 十 一 月 十 九 日 ( 九 二 ) 院 台 調 壹 字 第 ○ 九 二 ○ 八 ○ ○ 九 二 ○ 號 函 調 查 「 據 報 載 : 苗 栗 縣 通 宵 鎮 福 源 里 巨 豐 煙 火 製 造 股 份 有 限 公 司 工 廠 ( 下 禒 巨 豐 廠 ) 於 九 十 二 年 十 一 月 十 六 日 晚 間 驚 傳 爆 炸 , 造 成 六 人 死 亡 、 十 三 人 輕 重 傷 , 該 公 司 前 亦 曾 發 生 爆 炸 災 害 , 涉 有 危 害 公 共 安 全 之 情 節 重 大 , 相 關 業 務 主 管 機 關 有 無 違 失 ? 認 有 調 查 之 必 要 。 」 乙 案 , 發 現 缺 失 略 以 : 一 、 苗 栗 縣 消 防 局 、 消 防 署 及 勞 委 會 中 區 勞 檢 所 就 巨 豐 廠 爆 炸 原 因 之 事 證 研 判 、 推 論 依 據 及 鑑 定 結 果 顯 欠 一 致 , 足 見 國 内 工 作 場 所 爆 炸 災 害 原 因 鑑 定 機 制 尚 欠 健 全 … … 二 、 苗 栗 縣 消 防 局 疏 於 執 行 相 關 規 定 , 致 巨 豐 廠 火 災 之 鑑 定 作 業 及 調 查 報 告 書 之 撰 寫 , 失 之 草 率 , 核 有 未 當 … … 此 觀 之 本 院 九 十 三 年 七 月 十 五 日 ( 九 三 ) 院 台 內 字 第 ○ 九 三 一 九 ○ ○ 四 ○ 七 號 公 告 之 糾 正 案 文 自 明 。
四 、 消 防 署 針 對 火 災 調 查 業 務 相 關 統 計 數 據 未 臻 確 實 , 對 於 其 警 訊 亦 乏 警 覺 :
八 二 ( 一 ) 消 防 署 與 地 方 消 防 機 關 針 對 火 災 發 生 次 數 、 原 因 不 明 件 數 及 重 新 鑑 定 次 數 之 統 計 數 據 未 盡 相 符 、 精 確 , 洵 有 疏 漏 , 招 致 相 關 管 制 作 為 數 據 之 精 確 性 與 公 信 力 令 人 質 疑 , 顯 有 疏 失 :
按 火 災 原 因 調 查 實 施 要 點 第 八 點 資 料 統 計 分 析 之 規 定 : 「 應 依 消 防 署 公 務 統 計 方 案 之 規 定 , 對 於 火 災 案 件 定 期 加 以 統 計 、 分 析 、 比 較 , 並 將 資 料 提 供 作 為 預 防 及 消 防 政 策 等 改 進 之 參 考 。 」 是 消 防 署 、 各 直 轄 市 、 縣 市 消 防 局 如 依 規 定 定 期 對 於 火 災 案 件 確 實 統 計 、 分 析 、 比 較 , 則 相 關 統 計 數 據 理 應 正 確 無 誤 , 方 能 作 為 預 防 及 消 防 政 策 等 改 進 之 參 考 。 惟 依 據 消 防 署 及 各 直 轄 市 、 縣 市 消 防 局 針 對 近 十 ( 八 十 三 至 九 十 二 , 下 同 ) 年 火 災 業 務 相 關 統 計 數 據 之 查 復 統 計 結 果 : 一 、 各 年 度 統 計 資 料 : 雲 林 縣 消 防 局 欠 缺 八 十 五 年 統 計 資 料 、 高 雄 縣 消 防 局 缺 八 十 三 年 至 八 十 七 年 資 料 、 金 門 縣 消 防 局 與 消 防 署 均 缺 八 十 三 年 至 八 十 五 年 資 料 、 消 防 署 缺 連 江 縣 八 十 三 年 至 八 十 五 年 資 料 。 二 、 近 十 年 火 災 原 因 不 明 案 件 總 件 數 : 基 隆 市 消 防 局 統 計 資 料 為 一 六 件 、 消 防 署 為 一 八 件 ; 金 門 縣 ○ 件 , 消 防 署 八 件 ; 澎 湖 縣 ○ 件 、 消 防 署 六 件 。 三 、 近 十 年 全 國 火 災 案 件 總 件 數 : 消 防 署 為 一 三 四 、 一 ○ 八 件 、 地 方 消 防 局 總 計 則 為 一 二 六 、 八 六 五 件 。 三 、 近 十 年 各 縣 市 曾 重 新 辦 理 火 災 調 查 鑑 定 案 件 數 : 消 防 署 統 計 資 料 為 : 嘉 義 市 十 件 、 台 南 市 五 件 、 桃 園 縣 二 件 、 台 中 縣 八 件 、 彰 化 縣 一 件 、 南 投 縣 二 件 、 嘉 義 縣 三 件 、 高 雄 市 ○ 件 , 合 計 三 十 一 件 、 縣 市 消 防 局 統 計 資 料 則 為 : 嘉 義 市 十 件 、 台 南 市 六 件 、 桃 園 縣 ○ 件 、 台 中 縣 七 件 、 彰 化 縣 一 件 、 南 投 縣 ○ 件 、 嘉
八 三
義 縣 三 件 、 高 雄 市 一 件 , 合 計 二 十 八 件 。 顯 見 消 防 署 與 地 方 消 防 局 針 對 火 災 發 生 次 數 、 原 因 不 明 件 數 及 重 新 鑑 定 次 數 等 火 災 業 務 重 要 指 標 統 計 數 據 不 符 , 未 臻 精 確 , 甚 有 疏 漏 , 招 致 相 關 管 制 作 為 數 據 之 精 確 性 與 公 信 力 令 人 質 疑 , 不 無 疏 失 。
( 二 ) 消 防 署 針 對 火 災 業 務 相 關 統 計 數 據 之 警 訊 缺 乏 警 覺 及 因 應 措 施 , 防 火 管 理 作 為 不 足 , 顯 有 疏 失 :
經 本 院 研 閱 消 防 署 及 行 政 院 主 計 處 統 計 資 料 , 發 現 全 國 及 各 縣 市 火 災 相 關 統 計 數 據 , 呈 現 警 訊 , 理 應 作 為 消 防 機 關 防 火 管 理 對 策 之 參 考 , 惟 消 防 署 針 對 上 開 警 訊 , 竟 未 深 入 探 究 研 析 , 缺 乏 主 管 機 關 應 有 之 警 覺 及 因 應 措 施 , 難 謂 有 當 , 茲 析 述 如 下 :
1 、 按 台 灣 地 區 各 縣 市 消 防 人 力 比 ( 每 十 萬 人 消 防 人 員 數 目 ; 資 料 來 源 : 行 政 院 主 計 處 ) 依 次 為 : 澎 湖 縣 八 ○ ‧ ○ 五 、 嘉 義 市 六 六 ‧ 八 一 、 台 東 縣 五 七 ‧ 三 九 、 嘉 義 縣 五 六 ‧ 九 ○ 、 台 北 市 五 五 ‧ 七 二 、 南 投 縣 四 九 ‧ 一 四 、 基 隆 市 四 五 ‧ 七 三 、 新 竹 市 四 四 ‧ 六 一 、 新 竹 縣 四 二 ‧ 八 六 、 高 雄 市 三 九 ‧ 六 二 、 高 雄 縣 三 八 ‧ 五 一 、 苗 栗 縣 三 七 ‧ 四 五 … … 宜 蘭 縣 二 九 ‧ 三 ○ 、 台 中 縣 二 五 ‧ 一 四 、 台 北 縣 二 二 ‧ 一 六 。 是 澎 湖 縣 、 嘉 義 市 、 台 東 縣 、 嘉 義 縣 及 新 竹 縣 消 防 人 力 比 於 全 國 二 十 五 個 行 政 轄 區 分 別 高 居 第 一 位 、 第 二 位 、 第 三 位 、 第 四 位 及 第 九 位 , 理 應 有 較 充 分 人 力 運 用 於 所 轄 消 防 檢 查 及 防 火 管 理 , 以 避 免 火 災 事 故 之 發 生 , 惟 查 , 台 灣 地 區 各 縣 市 每 百 萬 人 火 災 死 亡 人 數 排 序 為 : 台 東 縣 : 二 五 ‧ 五 ○ 、 新 竹 縣 二 四 ‧ ○ 五 、 嘉 義 市 一 六 ‧ 九 一 、 嘉 義 縣 一 三 ‧ 九 八 、 澎 湖 縣 一 三 ‧ 一 ○ … … 每 千 戶 火 災 發 生 次
八 四 數 排 序 則 為 : 新 竹 縣 八 ‧ 九 一 、 台 東 縣 八 ‧ 四 一 、 嘉 義 市 五 ‧ 五 三 、 嘉 義 縣 四 ‧ 九 八 、 澎 湖 縣 四 ‧ 二 五 , 足 見 上 開 縣 市 竟 高 居 首 五 位 , 究 係 該 等 消 防 主 管 機 關 之 防 火 管 理 作 為 有 欠 積 極 , 抑 或 該 等 轄 區 存 在 特 殊 火 災 發 生 源 , 未 見 消 防 署 正 視 , 加 以 探 究 原 因 , 自 有 未 當 。
2 、 人 為 縱 火 於 火 災 發 生 原 因 中 所 占 比 例 , 八 十 六 年 為 四 ‧ 三 % 、 八 十 九 年 六 ‧ 五 % 、 九 十 年 八 ‧ 一 % 、 九 十 一 年 八 ‧ 五 % 、 九 十 二 年 八 ‧ 七 % , 顯 現 逐 年 遞 增 趨 勢 , 相 對 代 表 居 家 生 活 安 全 之 保 障 逐 年 降 低 , 惟 消 防 機 關 相 關 防 火 管 理 作 為 , 卻 未 對 此 警 訊 加 以 注 意 因 應 , 顯 有 欠 當 。
3 、 近 十 年 , 各 縣 市 火 災 案 件 原 因 屬 不 明 之 比 例 較 高 之 縣 市 依 序 為 : 南 投 縣 一 五 ‧ 八 三 % 、 彰 化 縣 一 二 ‧ 七 七 % 、 苗 栗 縣 七 ‧ 七 一 % 、 花 蓮 縣 七 ‧ 四 % 、 雲 林 縣 七 ‧ 二 六 % 、 屏 東 縣 六 ‧ 二 七 % 、 高 雄 縣 五 ‧ 五 六 % 、 桃 園 縣 五 ‧ 三 六 % , 較 之 各 縣 市 平均比例四‧六八%,顯然偏高,又近十年桃園縣火災案件發生總數為一四、 均 比 例 四 ‧ 六 八 % , 顯 然 偏 高 , 又 近 十 年 桃 園 縣 火 災 案 件 發 生 總 數 為 一 四 、 九 六 四 件 , 較 之 各 縣 市 平均件數五、○七四‧六件,竟達近三倍,是否肇因該等 均 件 數 五 、 ○ 七 四 ‧ 六 件 , 竟 達 近 三 倍 , 是 否 肇 因 該 等 縣 市 消 防 局 調 查 鑑 定 不 力 或 防 火 管 理 作 為 不 足 所 致 , 消 防 署 自 應 切 實 究 明 。
4 、 依 據 曾 對 民 眾 就 火 災 調 查 鑑 定 業 務 滿 意 度 調 查 統 計 之 台 東 縣 及 彰 化 縣 等 消 防 局 之 統 計 資 料 , 其 中 五 八 ‧ 二 五 % 受 訪 民 眾 ( 下 同 ) 認 為 消 防 局 火 災 鑑 定 時 效 應 提 昇 服 務 品 質 、 一 ○ % 認 為 火 災 證 明 之 核 發 應 提 昇 服 務 品 質 、 一 ○ ‧ 七 五 % 認 為 鑑 識 人 員 之 清 廉 應 提 昇 服 務 品 質 ; 六 ‧ 二 五 % 認 為 火 災 調 查 課 辦 事 效 率 較 好 , 遠 低 於
八 五
災 害 搶 救 課 三 四 ‧ 七 五 % 、 災 害 預 防 課 三 三 ‧ 五 % 、 救 災 救 護 指 揮 中 心 三 ○ % 、 災 害 管 理 課 九 ‧ 七 五 % ; 對 於 消 防 機 關 災 後 鑑 定 不 滿 者 則 占 八 ‧ 五 % 。 上 開 數 據 是 否 反 應 火 災 調 查 鑑 定 人 員 深 居 幕 後 , 不 若 第 一 線 救 災 人 員 較 為 民 眾 熟 悉 所 致 , 抑 或 反 應 業 務 實 際 存 在 之 弊 病 , 消 防 署 自 應 妥 為 研 處 。
五 、 內 政 部 宜 督 促 消 防 署 就 火 災 調 查 鑑 定 相 關 專 家 學 者 、 研 究 文 獻 所 提 建 議 及 興 革 意 見 , 妥 為 研 議 檢 討 , 以 完 備 火 災 調 查 鑑 定 制 度 , 精 進 提 升 火 災 調 查 鑑 定 之 品 質 :
經 本 院 自 九 十 三 年 七 月 至 十 月 間 , 持 續 蒐 集 火 災 調 查 鑑 定 相 關 學 術 著 作 、 政 府 出 版 品 、 參 考 文 獻 等 相 關 資 料 , 經 核 下 列 事 項 , 內 政 部 宜 督 促 消 防 署 妥 為 研 議 檢 討 , 以 完 備 火 災 調 查 鑑 定 制 度 , 精 進 火 災 調 查 鑑 定 品 質 :
( 一 ) 為 提 昇 消 防 機 關 火 災 證 物 鑑 定 技 術 之 公 信 力 , 消 防 署 除 應 具 體 要 求 各 消 防 機 關 從 事 火 災 調 查 鑑 定 之 人 員 隨 時 學 習 國 際 間 火 災 現 場 調 查 採 證 之 新 興 技 術 之 外 , 相 關 鑑 定 實 驗 室 之 設 備 、 鑑 定 能 力 應 儘 早 通 過 國 際 認 證 。
( 二 ) 火 災 調 查 鑑 定 工 作 第 一 要 務 即 是 發 現 火 災 原 因 , 而 國 內 近 十 幾 年 來 , 火 災 原 因 皆 以 電 氣 因 素 高 居 各 類 原 因 之 首 , 故 對 電 氣 火 災 鑑 定 新 技 術 的 嘗 詴 、 研 發 及 創 新 , 除 有 助 於 鑑 定 品 質 的 提 昇 之 外 , 亦 可 作 為 電 氣 火 災 預 防 管 理 之 參 考 。
( 三 ) 經 彙 整 相 關 人 員 歷 屆 「 國 際 縱 火 年 會 」 之 觀 摩 及 參 與 心 得 , 各 國 之 火 災 調 查 鑑 定 制 度 、 觀 念 制 度 , 足 資 我 國 火 災 調 查 鑑 定 工 作 之 參 考 如 下 : 「 瞭 解 火 流 勘 察 要 領 之 重 點 , 在 於 研 判 可 燃 物 、 引 火 源 及 延 燒 過 程 等 三 項 決 定 性 因 素 」 、 「 應 訂 定 各 禑 標 準
八 六 作 業 手 冊 」 、 「 建 立 專 業 證 照 制 度 」 、 「 開 放 民 間 調 查 鑑 定 公 司 參 與 實 務 鑑 定 , 藉 彼 此 良 性 競 爭 提 高 鑑 定 品 質 。 」 、 「 培 訓 縱 火 犬 」 、 「 增 進 國 際 間 火 災 調 查 人 員 之 交 流 」 、 「 爭 取 加 入 消 防 國 際 組 織 」 、 「 火 災 調 查 人 員 應 廣 納 新 知 , 加 強 教 育 訓 練 。 」
( 四 ) 藉 由 火 災 案 例 的 調 查 分 析 , 可 歸 納 出 相 關 火 災 危 險 要 因 , 進 而 嘗 詴 引 用 數 理 和 統 計 的 方 法 , 瞭 解 火 勢 延 燒 擴 大 的 現 象 , 構 建 火 災 災 例 分 析 模 式 , 並 藉 由 專 家 及 系 統 工 具 的 輔 助 , 將 完 整 的 火 災 災 例 分 析 模 式 , 利 用 電 腦 專 業 系 統 的 推 論 及 分 析 功 能 , 大 幅 提 昇 火 災 調 查 的 能 力 及 效 率 。
( 五 ) 台 灣 地 區 火 災 是 所 有 災 害 中 , 對 人 民 生 命 財 產 損 失 最 嚴 重 者 , 而 據 相 關 調 查 資 料 顯 示 , 六 十 % 、 七 十 % 以 上 的 火 災 , 是 發 生 於 老 舊 住 宅 建 築 物 。 因 此 , 消 防 機 關 宜 透 過 系 統 性 的 調 查 研 究 , 研 擬 如 何 在 現 有 法 令 機 制 所 不 能 限 制 , 或 都 市 更 新 計 晝 尚 未 設 計 , 或 尚 未 改 建 之 老 舊 眷 村 、 國 宅 社 區 , 或 早 期 發 展 但 尚 未 列 入 古 蹟 管 制 之 老 街 … 等 在 短 時 間 裡 無 法 改 善 其 現 狀 之 建 築 物 , 提 供 火 災 防 制 因 應 對 策 , 以 降 低 老 舊 社 區 住 宅 火 災 發 生 頻 率 。
( 六 ) 住 宅 火 災 傷 亡 人 數 遲 未 見 降 低 , 尤 其 是 老 舊 住 宅 社 區 , 原 因 除 火 災 危 險 因 子 未 見 改 善 外 , 民 眾 避 難 逃 生 知 識 之 不 足 , 以 及 初 期 火 災 滅 火 設 備 之 缺 乏 設 置 , 亦 為 一 大 主 因 。 雖 然 , 內 政 部 已 頒 布 「 舊 有 建 築 物 防 火 避 難 設 施 及 消 防 安 全 設 備 改 善 辦 法 」 據 以 改 善 舊 有 建 築 物 之 防 火 措 施 , 但 其 內 容 僅 限 於 供 公 眾 使 用 建 築 物 之 範 圍 , 對 於 實 施 都 市 計 畫 地 區 五 層 樓 以 下 或 非 實 施 都 市 計 畫 地 區 四 層 樓 以 下 之 樓 地 板 面 積 , 未 達
八 七
一 千 帄 方 公 尺 以 上 之 集 合 住 宅 ( 公 寓 ) 並 未 納 入 ; 而 所 訂 定 之 改 善 辦 法 亦 因 避 免 民 怨 , 一 直 無 法 有 效 改 善 , 大 多 數 的 縣 市 政 府 甚 至 尚 未 訂 定 相 關 分 期 分 區 之 執 行 計 畫 。
( 七 ) 火 災 原 因 調 查 之 意 義 , 除 提 供 司 法 機 關 參 考 , 以 確 定 刑 事 、 民 事 責 任 之 外 , 其 積 極 正 面 之 意 義 , 乃 在 提 供 「 預 防 行 政 」 之 參 考 ; 換 言 之 , 火 災 調 查 之 積 極 意 義 係 「 如 何 預 防 火 災 發 生 , 以 減 少 民 眾 生 命 財 產 之 損 失 。 」 時 下 科 技 日 新 月 異 , 為 能 提 供 「 預 防 行 政 」 之 參 考 , 火 災 原 因 調 查 , 除 力 求 火 災 原 因 、 案 件 資 料 之 健 全 外 , 最 重 要 者 , 在 於 資 料 之 善 加 統 計 及 分 析 , 其 除 有 助 於 消 防 政 策 之 確 立 與 描 繪 未 來 藍 圖 之 外 , 亦 使 消 防 政 策 與 制 度 更 符 合 未 來 社 會 之 需 要 , 確 實 達 「 預 防 火 災 」 之 功 效 。 為 求 正 確 統 計 、 分 析 火 災 原 因 與 火 災 案 件 相 關 資 料 , 資 料 建 立 務 須 即 時 、 詳 實 , 以 免 造 成 「 毒 果 樹 」 而 導 致 錯 誤 之 結 果 。 當 長 期 累 積 、 記 載 火 災 原 因 及 相 關 資 料 後 , 應 進 行 統 計 、 分 析 , 據 以 發 現 未 來 火 災 之 趨 勢 與 其 可 能 造 成 之 危 害 , 實 施 相 關 的 預 防 對 策 , 有 效 防 止 未 來 火 災 案 件 之 發 生 , 而 達 成 火 災 原 因 調 查 積 極 、 正 面 之 意 義 。 為 因 應 未 來 趨 勢 所 需 , 傳 統 之 火 災 紀 錄 固 然 具 有 記 載 、 描 述 火 災 之 功 用 , 但 於 分 析 未 來 火 災 趨 勢 上 , 其 效 果 則 尚 顯 不 足 , 所 以 為 彌 補 傳 統 之 火 災 紀 錄 , 則 應 藉 電 腦 進 行 記 載 、 統 計 及 分 析 , 方 符 合 未 來 火 災 預 防 行 政 之 所 需 。
( 八 ) 近 年 來 , 我 國 縱 火 犯 罪 問 題 有 日 益 嚴 重 之 趨 勢 , 除 凸 顯 民 眾 居 家 安 全 日 益 遭 受 嚴 重 威 脅 外 , 亦 造 成 火 災 保 險 業 者 蒙 受 嚴 重 的 損 失 , 首 先 除 應 針 對 火 災 保 險 業 對 圖 利 型 縱 火 犯 罪 防 制 之 問 題 , 針 對 核 保 、 查 勘 及 理 賠 作 業 提 出 防 制 策 略 , 並 應 建 立 保 險 公
八 八 司 與 消 防 、 警 察 、 檢 察 機 關 之 聯 合 防 制 機 制 , 其 應 包 的 內 容 如 : 一 、 建 立 跨 部 會 之 圖 利 型 縱 火 犯 罪 聯 合 防 制 機 制 , 並 成 立 專 責 單 位 負 責 圖 利 型 縱 火 犯 罪 之 防 制 工 作 。 二 、 建 構 保 險 業 與 檢 警 消 等 相 關 機 關 之 通 報 制 度 及 相 關 資 料 庫 連 結 措 施 , 共 同 防 制 圖 利 型 縱 火 犯 罪 。 三 、 加 強 教 育 及 媒 體 宣 傳 , 換 醒 大 眾 共 同 防 制 圖 利 型 縱 火 犯 罪 … … 。
( 九 ) 縱 火 案 件 宛 如 不 定 時 炸 彈 , 具 備 結 果 之 不 確 定 性 、 過 程 動 態 與 持 續 等 犯 罪 特 性 。 在 治 標 方 面 , 對 於 縱 火 者 應 迅 速 偵 破 並 嚴 懲 或 與 社 會 隔 離 , 以 收 嚇 阻 作 用 ; 對 於 身 心 障 礙 、 行 為 偏 差 者 , 相 關 醫 療 院 所 、 矯 正 機 構 應 積 極 輔 導 或 收 容 管 理 。 在 治 本 方 面 , 加 強 全 民 防 火 及 安 全 危 機 管 理 與 預 防 作 為 , 能 於 縱 火 災 害 發 生 時 及 時 避 難 逃 生 , 維 護 生 命 安 全 。 因 此 , 藉 由 政 府 相 關 單 位 的 積 極 防 制 搶 救 作 為 及 提 醒 民 眾 自 我 安 全 的 保 護 , 可 降 低 縱 火 案 件 的 損 失 及 傷 亡 。
( 十 ) 根 據 統 計 , 世 界 二 十 二 個 主 要 都 市 , 就 有 十 五 個 國 家 , 縱 火 為 其 火 災 案 件 主 要 貣 火 原 因 之 第 一 位 。 縱 火 犯 罪 儼 然 已 成 為 世 界 性 共 同 的 嚴 重 問 題 。 犯 罪 現 象 的 研 究 , 過 去 研 究 者 常 以 統 計 點 或 區 域 抽 樣 問 卷 方 式 , 從 中 暸 解 犯 罪 現 象 , 並 解 釋 犯 罪 行 為 。 然 而 , 研 究 犯 罪 現 象 的 最 直 接 方 式 , 對 犯 罪 者 訪 談 、 觀 察 , 從 犯 罪 心 理 角 度 透 視 其 行 為 潛 在 動 機 及 發 展 過 程 , 卻 甚 少 被 應 用 。 研 究 犯 罪 行 為 及 偵 查 技 巧 的 領 域 裡 , 近 十 年 來 亦 逐 漸 重 視 發 展 對 於 嫌 犯 人 格 質 及 行 為 模 式 的 心 理 描 繪 技 術 (Psychological profiling) , 其 內 涵 在 於 整 合 行 為 科 學 、 犯 罪 學 及 偵 查 技 巧 , 期 對 犯 罪 行 為 更 深 入 的 瞭 解 , 並 藉 偵 防 縱 火 犯 罪 資 料 之 有 效 建 立 , 做 為 日 後 國 內 發 展 有 關 「 嫌 犯 人 格 特
八 九
徵 描 繪 」 (Criminal Characteristics Profiling) 電 腦 系 統 之 基 礎 檔 案 , 而 有 助 於 警 察 人 員 對 縱 火 犯 罪 之 偵 查 、 鑑 識 及 逮 捕 工 作 。
( 十 一 ) 火 災 現 場 千 變 萬 化 , 舉 凡 貣 火 物 質 之 禑 類 、 數 量 、 建 築 結 構 、 室 內 擺 設 、 火 場 溫 度 、 持 續 時 間 、 救 災 行 動 、 氣 象 因 素 … … 等 , 皆 可 影 響 火 災 現 場 跡 證 之 是 否 留 存 。 故 欲 藉 模 擬 實 驗 來 觀 察 火 災 現 場 跡 證 之 變 化 , 並 進 行 鑑 定 , 實 為 一 相 當 困 難 且 為 長 期 性 之 研 究 工 作 , 必 須 專 業 鑑 定 人 員 之 積 極 、 耐 心 參 與 , 方 可 收 預 期 之 成 效 。
( 十 二 ) 美 國 針 對 火 災 調 查 鑑 定 之 教 育 訓 練 , 與 我 國 最 大 不 同 點 在 於 基 層 消 防 人 員 的 養 成 教 育 , 其 接 受 的 是 最 實 際 且 最 有 效 率 的 教 導 。 他 們 以 實 際 放 火 燒 房 子 的 方 式 來 進 行 教 育 訓 練 , 讓 每 一 個 消 防 同 仁 於 養 成 教 育 期 間 就 有 機 會 學 習 如 何 調 查 , 具 備 真 正 的 調 查 實 戰 經 驗 , 待 將 來 投 入 工 作 崗 位 , 即 可 發 揮 一 定 戰 力 , 不 像 我 國 的 養 成 教 育 , 只 會 紙 上 談 兵 , 連 一 個 專 屬 的 訓 練 場 地 都 沒 有 , 包 括 在 實 務 單 位 從 事 火 災 原 因 調 查 人 員 , 常 因 缺 乏 紮 實 的 學 習 及 豐 富 的 實 戰 經 驗 , 而 無 法 具 體 研 判 貣 火 處 、 所 及 原 因 , 顯 亟 待 改 進 。 另 關 於 縱 火 之 調 查 與 防 制 , 在 美 國 是 屬 功 能 聯 合 、 科 際 整 全 之 團 隊 工 作 , 火 災 調 查 體 系 除 由 消 警 人 員 通 力 合 作 外 , 保 險 業 者 為 防 範 詐 領 保 險 金 , 亦 可 對 現 場 進 行 調 查 , 擬 提 意 見 供 檢 警 機 關 參 考 。
( 十 三 ) 傳 統 上 強 調 以 「 救 火 」 為 主 的 消 防 救 災 觀 念 和 作 法 , 已 不 能 滿 足 現 代 民 眾 生 活 安 全 上 的 需 求 。 為 此 , 消 防 機 關 宜 改 變 思 考 的 方 向 , 更 積 極 地 自 火 災 防 制 基 礎 工 作 之 「 火 災 調 查 」 上 著 手 , 由 防 災 觀 點 更 重 視 火 災 調 查 結 果 的 運 用 , 發 揮 其 在 火 災 預 防 、
九 ○ 火 災 搶 救 上 之 重 要 參 考 性 和 效 益 性 , 並 突 破 以 往 火 災 調 查 調 人 員 僅 憑 個 人 經 驗 法 則 勘 查 火 災 案 件 、 單 純 以 線 性 化 統 計 分 析 火 災 資 料 及 被 動 處 理 縱 火 火 災 的 方 式 , 進 一 步 積 極 運 用 空 間 化 資 料 處 理 之 技 術 及 其 他 可 行 的 分 析 工 具 , 來 協 助 並 促 進 現 行 火 災 調 查 方 法 的 「 系 統 化 」 、 「 數 據 化 」 、 「 實 體 化 」 和 「 正 確 化 」 , 進 而 使 火 災 調 查 之 所 得 不 但 具 有 提 供 民 、 刑 事 責 任 認 定 之 消 極 功 能 , 而 且 更 能 發 揮 積 極 改 進 火 災 搶 救 技 術 及 提 供 火 災 預 防 有 效 資 訊 之 正 面 功 效 。
九 一
捌 、 處 理 辦 法 :
一 、 調 查 意 見 一 、 二 、 三 、 四 等 四 大 類 全 部 意 見 , 依 監 察 法 第 二 十 四 條 提 案 糾 正 內 政 部 、 消 防 署 、 警 政 署 、 高 雄 縣 政 府 、 屏 東 縣 政 府 、 彰 化 縣 政 府 。
二 、 抄 調 查 意 見 五 , 函 請 內 政 部 轉 飭 所 屬 檢 討 改 進 見 復 。
三 、 本 專 案 調 查 報 告 製 成 專 書 提 供 各 界 參 考 。
四 、 本 專 案 調 查 報 告 公 開 並 公 告 於 本 院 網 站 首 頁 。
五 、 抄 調 查 報 告 , 送 請 本 院 人 權 保 障 委 員 會 參 考 。
六 、 檢 附 派 查 函 及 相 關 附 件 , 送 請 本 院 內 政 及 少 數 民 族 委 員 會 處 理 。
調 查 委 員 : 林 委 員 鉅 鋃
林 委 員 將 財
中 華 民 國 九 十 三 年 十 二 月 二 日
附 件 : 本 院 九 十 三 年 五 月 二 十 八 日 ( 九 三 ) 院 台 調 壹 字 第 ○ 九 三 ○ 八 ○ ○ 三 七 五 號 函 及 相 關 卷 宗 。
九 二 附 件 一 、 火 災 調 查 鑑 定 相 關 文 獻 之 研 究 論 述 及 成 果 ( 詳 附 表 一 )
附 表 一 、 火 災 調 查 鑑 定 相 關 文 獻 之 研 究 論 述 及 成 果 ( 依 發 表 時 間 排 序 )
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
民 國 ( 下 同 ) 九 十 三 年 高 雄 市 政 府 消 防 局 劉 冠 亨
股 長 公 務 出 國 報 告
赴 美 研 習 火 災 原 因 調 查 鑑 識 心 得 報 告
縱 火 不 但 是 偏 差 行 為 , 違 反 社 會 的 行 為 規 範 , 更 為 法 所 難 容 的 犯 罪 行 為 ; 唯 縱 火 犯 行 簡 單 容 易 與 隱 避 , 而 縱 火 劑 取 得 容 易 , 在 低 破 案 率 之 情 況 下 , 導 致 犯 罪 人 常 喜 以 縱 火 為 犯 罪 之 方 式 , 亦 成 為 縱 火 問 題 日 益 嚴 重 的 主 因 之 一 。 縱 火 刑 案 的 追 查 , 與 火 災 原 因 的 調 查 直 接 相 關 , 若 能 正 確 迅 速 有 效 的 判 定 起火原 火 原 因 , 則 縱 火 案 愈 能 儘 早 偵 破 , 愈 能 有 效 遏 阻 心 存 僥 倖 的 歹 徒 。 因 此 , 火 災 原 因 鑑 定 技 術 的 全 面 提 昇 , 實 屬 刻 不 容 緩 。 如 以 美 國 材 料 測 試協會( 協 會 ( The American Society for Test and Materials ) 所 定 的 ASTM Method E 1412-95. ( 1955 ) 標 準 萃 取 縱 火 促 燃 劑 , 經 氣 相 層 析 質 譜 儀 分 析 後 , 再 以 ASTM E1618 ( 1997 ) 標 準 為 鑑 定 基 準 , 鑑 定 縱 火 使 用 之 促 燃 劑 。
九 十 三 年 台 北 市 政 府 消 防 局 何 思 佳 公 務 出 國 報 告
火 災 現 場 證 物 鑑 定 技 術
為 提 昇 消 防 機 關 火 災 證 物 鑑 定 技 術 之 公 信 力 , 第 一 階 段 在 美 國 阿 拉 巴 馬 大 學 化 學 系 研 習 , 學 習 火 災 現 場 調 查 採 證 的 重 要 要 領 並 學 習 最 新 發 展 之 「 固 相 微 萃 取 法 」 ( SPME ) 萃 取 火 場 殘 跡 內 之 促 燃 劑 成 分 ; 第 二 階 段 至 刑 事 鑑 識 中 心 促
九 三
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
燃 劑 實 驗 室 實 習 , 學 習 並 瞭 解 國 外 政 府 機 關 之 實 際 運 作 情 形 ; 第 三 階 段 為 觀 摩 實 習 , 為 期 十 四 日 , 主 要 是 參 加 美 國 刑 事 實 驗 室 認 證 協 會 ( ASCLD ) 為 有 意 認 證 實 驗 室 舉 辦 之 工 作 坊 及 年 會 。 另 於 年 會 結 束 後 , 參 訪 附 近 已 通 過 認 證 之 實 驗 室 , 實 際 體 驗 認 證 實 驗 室 之 軟 硬 體 設 備 及 人 員 配 置 。
台 北 市 議 會 議 員 研 究 室 九 十 三 年 ( 九 三 ) 晉 服 字 第 ○ 七 四 號 函
火 災 原 因 調 查 報 告 書 可 否 提 供 當 事 人 參 考 疑 義
目 前 凡 有 車 禍發生,肇事雙方當事人皆可向交通大隊申請交通肇事責任分 發 生 , 肇 事 雙 方 當 事 人 皆 可 向 交 通 大 隊 申 請 交 通 肇 事 責 任 分 析 表 , 此 分 析 表 提 供 肇 事 原 因 之 鑑 定 以 及 責 任 之 分 析 。 而 若 為 火 災 之 受 災 戶 或 致 縱 火 、 失 火 之 嫌 疑 人 , 消 防 單 位 卻 不 提 供 火 災 原 因 調 查 報 告 書 予 當 事 人 參 考 … … 火 災 原 因 調 查 報 告 書 為 單 純 之 原 因 鑑 定 報 告 , 並 不 影 響 刑 事 證 據 之 偵 蒐 、 保 全 , 自 應 無 悖 刑 法 第 二 百 四 十 五 條 偵 查 不 公 開 原 則 , 當 然 亦 不 足 以 妨 礙 被 告 受 公 正 之 裁 判 … … 火 災 調 查 原 因 報 告 書 無 涉 責 任 之 分 析 、 判 斷 , 自 應 更 無 不 提 供 當 事 人 參 考 之 理 。
九 十 三 學 年 度 私 立 逢 甲 大 學 都 市 計 畫 研 究 所 陳 育 台 中 市 火 災 發 生 潛 勢 分 析 之 研 究
都 市 為 人 口 集 中 之 主 要 區 域 , 而 建 構 一 個 安 全 的 都 市 , 為 都 市 規 劃 中 重 要 的 課 題 。 由 都 市 防 災 的 觀 點 , 加 強 預 防 易 發 生 火 災 地 區 所 帶 來 的 潛 在 威 脅 , 以 建 構 一 個 安 全 的 都 市 生 活 空 間 為 本 研 究 之 主 旨 。 都 市 災 害 中 防 災 重 於 救 災 , 土
九 四 發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
瑛 碩 士 論 文 ( 指 導 教 授 : 周 宜 強 )
地 使 用 及 活 動 型 態 為 造 成 都 市 火 災 危 險 原 因 之 一 , 故 如 何 判 斷 易 發 生 火 災 的 土 地 使 用 類 型 及 活 動 在 都 市 的 分 布 狀 況 , 便 顯 得 相 對 重 要 。 本 研 究 目 的 為 建 構 台 中 市 火 災 發 生 潛 勢 之 分 析 圖 , 在 建 構 的 過 程 中 歸 納 出 何 種不同的土地使用或活 不 同 的 土 地 使 用 或 活 動 , 為 火 災 之 主 要 潛 在 危 險 項 目 , 並 區 隔 易 發 火 災 之 危 險 區 域 。
本 研 究 係 以 台 中 市 為 研 究 對 象 , 利 用 台 中 市 土 地 使 用 調 查 之 二 手 資 料 與 台 中 市 近 年 來 火 災 發 生 地 點 之 分 布 為 基 礎 , 探 討 不 同 土 地 使 用 行 為 或 活 動 與 火 災 間 之 關 連 性 , 藉 由 台 中 市 土 地 使 用 數 值 檔 對 照 火 災 發 生 地 點 分 布 位 置 , 為 研 究 之 基 本 資 料 , 同 時 應 用 地 理 資 訊 系 統 ( GIS ) 及 運 用 多 變 量 分 析 方 法 , 加 以 討 論 火 災 發 生 地 與 土 地 使 用 的 相 關 性 。 運 用 鑑 別 分 析 可 明 確 的 指 示 某 地 區 土 地 使 用 或 活 動 對 都 市 火 災 造 成 之 潛 在 威 脅 , 其 結 果 可 提 供 未 來 台 中 市 土 地 規 劃 單 位 、 消 防 單 位 進 行 各 項 計 畫 、 方 案 之 推 動 , 並 就 其 結 果 與 實 際 情 形 加 以 比 較 檢 討 。
九 十 二 年 學 年 度 銘 傳 大 學 經 濟 學 火 災 保 險 圖 利 型 縱 火 問 近 年 來 , 我 國 之 縱 火 犯 罪 問 題 有 日 益 嚴 重 之 趨 勢 , 造 成 火 災 保 險 業 者 蒙 受 嚴 重 的 損 失 。 本 研 究 首 先 針 對 目 前 火 災 保 險 業 所 面 臨 之 圖 利 型 縱 火 防 制 問 題 ,
九 五
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
系 保 險 經 營 與 金 融 經 濟 在 職 專 班 陳 俊 吉碩士論文 碩 士 論 文 ( 指 導 教 授 : 宋 明 哲 、 鄭 濟 世 )
題 防 制 與 對 策 之 研 究
針 對 特 殊 之 圖 利 型 縱 火 集 團 個 案 , 採 個 案 研 究 之 方 式 深 入 探 討 , 並 擬 定 防 制 對 策 , 供 相 關 單 位 參 考 , 以 期 有 效 降 低 圖 利 型 縱 火 犯 罪 之 發 生 。 本 研 究 中 , 針 對 圖 利 型 縱 火 犯 罪 問 題 所 擬 定 之 防 制 對 策 如 下 : 首 先 、 針 對 火 災 保 險 業 對 圖 利 型 縱 火 犯 罪 防 制 之 問 題 , 就 核 保 、 查 勘 及 理 賠 作 業 防 制 策 略 之 建 議 如 下 : 一 、 加 強 核 保 、 查 勘 及 理 賠 人 員 對 於 圖 利 型 縱 火 犯 罪 之 辨 識 能 力 及 專 業 訓 練 。 二 、 擬 定 圖 利 型 縱 火 犯 罪 核 保 、 查 勘 及 理 賠 標 準 作 業 流 程 。 三 、 建 立 判 斷 可 疑 圖 利 型 縱 火 業 務 之 核 保 準 則 , 並 擬 訂 檢 核 表 研 斷 可 疑 縱 火 案 件 。 其 次 、 建 立 保 險 公 司 與 消 防 、 警 察 、 檢 察 機 關 之 圖 利 型 縱 火 犯 罪 之 聯 合 防 制 機 制 , 其 內 容 包 含 : 一 、 保 險 業 者 應 扮 演 主 動 積 極 角 色 參 與 各 項 防 制 計 劃 , 協 助 相 關 單 位 完 成 各 項 防 制 措 施 。 二 、 建 立 跨 部 會 之 圖 利 型 縱 火 犯 罪 聯 合 防 制 機 制 , 並 成 立 專 責 單 位 負 責 圖 利 型 縱 火 犯 罪 之 防 制 工 作 。 三 、 建 構 保 險 業 與 檢 警 消 等 機 關 之 通 報 制 度 及 相 關 資 料 庫 之 連 結 措 施 , 共 同 防 制 圖 利 型 縱 火 犯 罪 。 四 、 加 強 教 育 及 媒 體 宣 傳 , 喚 醒 大 眾 共 同 防 制 圖 利 型 縱 火 犯 罪 。
九 十 二 年 一 月 台 淺 談 火 災 調
火 災 原 因 調 查 之 目 的 , 除 提 供 司 法 機 關 參 考 , 以 供 刑 事 、 民 事 責 任 之 確 定
九 六 發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
南 市 消 防 季 刊 第 四 十 六 期
查 業 務 之 提 昇
外 , 其 積 極 正 面 之 意 義 乃 在 提 供 預 防 行 政 之 參 考 ; 換 言 之 , 火 災 調 查 之 積 極 意 義 在 「 如 何 預 防 火 災 的 發 生 , 以 減 少 民 眾 生 命 財 產 之 損 失 。 」 時 下 科 技 日 新 月 異 , 火 災 原 因 調 查 為 能 提 供 「 預 防 行 政 」 之 參 考 , 除 力 求 火 災 原 因 、 案 件 資 料 之 健 全 外 , 最 重 要 者 乃 在 統 計 、 分 析 。 正 確 之 統 計 、 分 析 , 將 有 助 於 消 防 政 策 之 確 立 與 描 繪 未 來 之 藍 圖 , 而 使 消 防 政 策 與 制 度 更 符 合 未 來 社 會 、 社 區 之 需 要 , 確 實 達 「 預 防 火 災 」 之 功 效 。
為 求 正 確 統 計 、 分 析 火 災 原 因 與 火 災 案 件 相 關 資 料 , 資 料 建 立 務 須 即 時 、 詳 實 , 以 免 造 成 「 毒 果 樹 」 而 導 致 錯 誤 之 結 果 。 為 因 應 未 來 趨 勢 所 需 , 傳 統 之 火 災 紀 錄 固 然 具 有 記 載 、 描 述 火 災 之 功 用 , 但 於 分 析 未 來 火 災 趨 勢 上 , 其 效 果 則 尚 顯 不 足 , 故 為 彌 補 傳 統 火 災 書 面 紀 錄 之 不 足 , 應 以 電 腦 進 行 記 載 、 統 計 及 分 析 , 如 此 方 符 合 未 來 火 災 預 防 行 政 之 所 需 。 當 然 在 火 災 鑑 識 與 鑑 定 上 , 仍 需 倚 賴 調 查 人 員 為 之 , 但 在 火 災 調 查 完 成 後 , 一 切 資 訊 應 即 輸 入 電 腦 ( 以 電 腦 進 行 火 災 案 件 相 關 資 料 之 登 載 ) , 甚 至 火 災 原 因 調 查 報 告 書 之 製 作 , 皆 可 於 電 腦 中 完 成 , 當 所 有 資 料 詳 實 記 載 , 大 量 累 積 於 電 腦 時 , 即 可 依 據 各 種需求進行各 需 求 進 行 各
九 七
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
項 分 析 , 以 達 成 火 災 調 查 之 積 極 目 的 。 對 於 個 案 案 件 , 司 法 或 調 查 機 關 需 要 火 災 原 因 調 查 報 告 書 ( 行 政 機 關 之 調 查 報 告 書 ) 時 , 亦 可 從 資 料 庫 中 提 供 數 位 化 之 資 料 , 如 此 火 災 調 查 業 務 之 提 升 , 為 期 不 遠 。
九 十 二 年 經 濟 部 投 資 業 務 處 、 台 灣 外 貿 發 展 協 會 高 雄 辦 事 處 、 財 團 法 人 海 峽 交 流 基 金 會 主 辦 二 岸 經 貿 講 座 ( 袁 台 龍 龍 柏 國 際 法 律 事 務 所 律 師 主 講 ) 如 何 正 確 處 理 大 陸 企 業 工 廠 的 危 安 事 件
一 、
火 災 事 故 原 因 調 查 及 認 定 :
大 陸 火 災 事 故 的 調 查 由 公 安 消 防 機 構 負 責 實 施 , 所 以 台 商 首 先 必 須 弄 清 楚 管 區 是 誰 在 負 責 。 火 災 事 故 的 調 查 , 係 按 下 列 分 工 進 行 : ( 一 ) 一 般 火 災 事 故 的 調 查 , 由 火 災 事 故 發 生 地 的 縣 ( 市 、 區 、 旗 ) 之 公 安 消 防 機 構 進 行 。 ( 二 ) 重 大 火 災 事 故 的 調 查 , 由 火 災 事 故 發 生 地 的 縣 ( 市 、 區 、 旗 ) 或 者 地 ( 市 、 州 、 盟 ) 公 安 消 防 機 構 進 行 。 ( 三 ) 特 大 火 災 事 故 的 調 查 , 由 火 災 事 故 發 生 地 的 地 ( 市 、 州 、 盟 ) 或 者 省 級 公 安 消 防 機 構 進 行 。 ( 四 ) 跨 行 政 區 域 的 火 災 事 故 的 調 查 , 由 最 先 起火地的公安消防機構進行調查,而相關區域的公安消防機構予 火 地 的 公 安 消 防 機 構 進 行 調 查 , 而 相 關 區 域 的 公 安 消 防 機 構 予 以 協 助 。 上 級 公 安 消 防 機 構 必 要 時 , 可 對 下 級 公 安 消 防 機 構 調 查 的 火 災 事 故 進 行 複 查 。 最 上 級 的 公 安 消 防 機 構 是 公 安 部 消 防 局 , 負 責 督 促 、 檢 查 、 指 導 特 大 火 災 事 故 的 調 查 工 作 。 火 災 事 故 調 查 人 員 接 獲 調 查 任 務 後 , 應 當 即 赴 火 災 現
九 八 發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
場 , 展 開 火 災 事 故 調 查 工 作 。 大 陸 公 安 消 防 機 構 有 權 根 據 需 要 封 閉 火 災 現 場 , 台 資 企 業 以 及 所 屬 的 幹 部 、 職 工 應 當 積 極 配 合 及 協 助 保 全 火 災 現 場 。 火 災 事 故 調 查 組 成 員 的 職 責 是 : ( 一 ) 查 明 事 故 發 生 的 原 因 、 人 員 傷 亡 及 財 產 情 況 。 ( 二 ) 查 明 事 故 的 性 質 和 責 任 。 ( 三 ) 提 出 對 事 故 責 任 者 的 處 理 意 見 。 ( 四 ) 提 出 事 故 處 理 及 防 止 類 似 事 故 再 次 發 生 所 應 採 取 措 施 的 建 議 。 ( 五 ) 撰 寫 完 成 事 故 調 查 報 告 。 調 查 詢 問 人 員 不 得 少 於 兩 人 。 詢 問 筆 錄 應 由 被 詢 問 人 核 實 後 簽 名 或 者 蓋 章 , 所 以 台 商 若 是 被 詢 問 , 一 定 要 確 實 看 完 筆 錄 後 方 能 簽 名 … … 現 場 勘 查 結 束 後 , 火 災 事 故 調 查 人 員 應 及 時 製 作 現 場 勘 查 筆 錄 、 現 場 圖 、 現 場 照 片 等 客 觀 反 映 火 災 現 場 情 況 的 紀 錄 。 火 災 現 場 採 取 的 痕 跡 物 證 , 如 需 進 行 技 術 鑑 定 的 , 應 送 交 公 安 消 防 機 構 技 術 鑑 定 部 門 或 者 其 委 託 的 專 業 技 術 部 門 鑑 定 , 針 對 火 災 事 故 中 死 亡 的 人 員 , 則 應 經 法 醫 鑑 定 。
公 安 消 防 機 構 應 根 據 火 災 現 場 詢 問 、 現 場 勘 查 、 技 術 鑑 定 等 調 查 情 況 , 判 定 火 災 原 因 , 並 製 作 成 火 災 原 因 認 定 書 。 火 災 原 因 認 定 書 自 作 出 之 日 起七日內 七 日 內 送 達 有 關 當 事 人 ( 所 謂 當 事 人 , 是 指 與 火 災 原 因 認 定 和 火 災 事 故 責 任 認 定 有 直
九 九
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
接 利 害 關 係 的 單 位 和 個 人 ) 。 若 是 台 商 未 在 法 定 時 間 內 收 到 火 災 原 因 認 定 書 , 一 定 要 主 動 向 公 安 消 防 機 構 索 取 。 台 商 對 火 災 原 因 、 火 災 事 故 責 任 認 定 不 服 者 , 自 收 到 火 災 原 因 認 定 書 之 日 起十五日內,可向火災事故發生地之主管公安 十 五 日 內 , 可 向 火 災 事 故 發 生 地 之 主 管 公 安 機 關 或 者 一 級 公 安 消 防 機 構 申 請 重 新 認 定 ; 對 省 級 公 安 消 防 機 構 作 出 的 火 災 原 因 、 火 災 事 故 責 任 認 定 不 服 者 , 向 當 級 公 安 機 關 申 請 重 新 認 定 。 火 災 事 故 發 生 地 主 管 公 安 機 關 或 者 上 一 級 公 安 消 防 機 構 在 收 到 重 新 認 定 的 申 請 , 並 作 出 決 定 後 , 應 當 製 作 火 災 原 因 重 新 認 定 書 , 分 送 申 請 人 和 原 認 定 機 構 。
公 安 消 防 機 構 應 當 根 據 火 災 原 因 、 火 災 損 失 等 調 查 情 況 , 查 明 火 災 事 故 責 任 , 製 作 火 災 事 故 責 任 書 。 火 災 事 故 責 任 書 自 作 出 之 日 起七日送達有關當事 七 日 送 達 有 關 當 事 人 ; 實 務 上 , 通 常 是 火 災 原 因 認 定 書 與 火 災 事 故 責 任 書 同 時 送 達 。
二 、 火 災 損 失 的 核 定 :
火 災 損 失 應 由 受 損 單 位 或 者 個 人 如 實 統 計 , 並 由 受 損 單 位 或 者 個 人 簽 字 蓋 章 後 報 請 公 安 消 防 機 構 ; 而 公 安 消 防 機 構 應 當 根 據 有 關 規 定 及 時 指 派 火 災 事 故 調 查 人 員 對 上 報 的 火 災 損 失 情 況 進 行 核 定 , 任 何 單 位 和 個 人 不 得 干 擾 火 災 損 失
一 ○ ○
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
之 核 定 工 作 , 不 得 謊 報 、 瞞 報 、 虛 報 和 漏 報 火 災 損 失 。 因 此 , 台 商 平日就要對 日 就 要 對 企 業 、 工 廠 內 的 財 產 進 行 記 錄 ( 甚 至 攝 影 ) , 並 且 定 期 更 新 。 要 注 意 的 是 : 更 新 的 財 產 紀 錄 要 異 地 存 放 , 例 如 在 銀 行 租 保 險 箱 存 放 , 以 避 免 同 付 一 炬 。
三 、 行 政 處 罰 因 應 之 道 :
根 據 八 十 九 年 三 月 二 十 日 大 陸 公 安 部 發 布 關 於 「 對 火 災 事 故 責 任 認 定 不 服 是 否 屬 行 政 訴 訟 受 案 範 圍 」 的 批 覆 內 容 指 出 , 火 災 事 故 責 任 認 定 是 公 安 消 防 機 構 在 查 明 火 災 事 實 後 , 根 據 當 事 人 的 行 為 與 火 災 事 故 之 間 因 果 關 係 , 以 及 其 行 為 在 火 災 事 故 中 所 起的作用而作出的結論,其本身並不確定當事人的權利義 的 作 用 而 作 出 的 結 論 , 其 本 身 並 不 確 定 當 事 人 的 權 利 義 務 , 不 是 一 種獨立的行政行為,所以不屬於行政訴訟法第十一條規定的受案範 獨 立 的 行 政 行 為 , 所 以 不 屬 於 行 政 訴 訟 法 第 十 一 條 規 定 的 受 案 範 圍 。 當 事 人 對 火 災 事 故 責 任 認 定 不 服 者 , 依 據 火 災 事 故 調 查 規 定 第 三 十 一 條 規 定 , 可 申 請 重 新 認 定 。 面 對 火 災 事 故 或 其 他 重 大 危 安 事 件 所 引 發 的 行 政 處 罰 , 台 商 應 如 何 因 應 ? 以 下 是 重 大 危 安 事 件 因 應 之 道 之 建 議 : ( 一 ) 要 求 行 政 機 關 提 出 法 定 依 據 並 遵 守 法 定 程 序 。 ( 二 ) 善 用 陳 述 權 和 申 辯 權 , 不 讓 自 己 的 權 利 窒 息 。 ( 三 ) 要 求 國 家 賠 償 。 ( 四 ) 主 動 消 除 或 者 減 輕 違 法 行 為 之 危 害 後 果 、 ( 五 )
一 ○ 一
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
要 求 聽 證 。 ( 六 ) 延 期 或 者 分 期 繳 納 罰 款 。
九 十 一 年 七 月 十 五 日 內 政 部 消 防 署 吳 靜 茹 技 士 公 務 出 國 報 告
赴 美 國 研 習 火 災 原 因 調 查 及 鑑 定 新 知 的 工 作 報 告
近 年 來 縱 火 案 件 頻 傳 且 於 每 年 火 災 案 件 中 占 有 相 當 比 例 , 自 八 十 一 年 至 九 十 年 當 中 , 人 為 縱 火 案 件 由 四 九 三 件 增 加 至 一 、 一 二 ○ 件 , 於 十 年 內 增 加 二 倍 以 上 , 比 例 亦 從 每 年 六 、 七 % 逐 漸 上 升 至 八 、 一 % ; 其 中 尤 以 都 市 地 區 為 甚 , 實 因 建 築 物 的 密 集 、 高 層 化 與 大 型 化 及 各 種裝潢材料的普遍使用,再加上社會 裝 潢 材 料 的 普 遍 使 用 , 再 加 上 社 會 繁 榮 , 進 步 急 速 , 使 得 少 數 面 臨 社 會 文 化 變 遷 適 應 困 難 者 、 失 意 者 , 甚 至 許 多 為 詐 領 保 險 金 者 , 做 出 如 台 北 市 神 話 世 界 K T V 、 天 龍 三 溫 暖 、 論 情 西 餐 廳 、 卡 爾 登 理 容 院 、 快 樂 頌 K T V 、 台 北 市 晴 光 市 場 、 新 竹 市 夜 歸 人 K T V 等 大 火 災 害 , 再 加 上 九 十 年 年 初 連 續 性 汽 、 機 車 縱 火 , 僅 高 雄 市 一 月 至 二 月 間 , 即 有 四 十 多 起之案件發生,均造成相當多之人命傷亡與財產損失,嚴重危害公共安 之 案 件 發 生 , 均 造 成 相 當 多 之 人 命 傷 亡 與 財 產 損 失 , 嚴 重 危 害 公 共 安 全 , 因 此 縱 火 在 我 國 已 成 不 可 忽 視 之 大 問 題 。 縱 火 案 件 之 偵 查 、 起訴,需要靠 訴 , 需 要 靠 正 確 之 起火處研判、證物採集及鑑析;而縱火案件使用促燃劑協助快速縱火燃 火 處 研 判 、 證 物 採 集 及 鑑 析 ; 而 縱 火 案 件 使 用 促 燃 劑 協 助 快 速 縱 火 燃 燒 的 案 例 特 別 多 , 如 何 快 速 及 有 效 率 之 鑑 析 是 非 常 重 要 的 ; 而 美 國 在 證 物 鑑 析 上 , 已 成 為 全 世 界 之 圭 臬 , 因 此 赴 該 國 學 習 更 先 進 及 收 集 彙 整 更 多 之 相 關 資
一 ○ 二
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
料 , 必 能 提 昇 消 防 署 目 前 證 物 鑑 定 操 作 技 術 , 並 增 進 更 多 之 鑑 析 新 知 。 另 國 內 目 前 有 些 火 災 係 因 爆 裂 物 引 起,且其造成人命傷亡及財產損失,更甚一般火 , 且 其 造 成 人 命 傷 亡 及 財 產 損 失 , 更 甚 一 般 火 災 , 故 瞭 解 爆 裂 物 鑑 析 , 為 本 次 學 習 之 另 一 目 的 ; 美 國 九 月 初 發 生 震 驚 全 世 界 駭 人 聽 聞 的 九 一 一 恐 怖 事 件 , 其 造 成 紐 約 世 貿 大 樓 之 倒 塌 及 多 起飛機劫機與爆 飛 機 劫 機 與 爆 炸 事 件 , 相 信 該 國 對 爆 裂 物 之 鑑 析 , 勢 必 有 更 進 一 步 之 了 解 及 體 認 , 故 至 該 國 學 習 爆 裂 物 分 析 , 勢 必 能 獲 得 最 新 之 技 術 及 資 訊 。 本 次 計 前 往 美 國 紐 約 、 波 士 頓 地 區 鑑 識 科 學 化 驗 室 及 康 乃 迪 克 州 、 喬 治 亞 州 、 阿 拉 巴 馬 州 州 立 刑 事 鑑 識 實 驗 室 及 美 國 煙 酒 槍 枝 管 制 局 ( ATF ) , 主 要 為 更 深 入 瞭 解 各 實 驗 室 縱 火 促 燃 劑 跡 證 分 析 與 消 防 署 目 前 有 何 差 異 性 , 並 實 地 參 觀 及 學 習 其 操 作 之 特 殊 技 巧 ; 另 更 進 一 步 學 習 爆 裂 物 之 分 析 以 及 參 訪 其 他 刑 事 鑑 識 之 相 關 跡 證 分 析 , 包 括 文 書 鑑 定 、 D N A 分 析 。 除 此 之 外 , 亦 參 觀 消 防 局 及 縱 火 偵 查 犬 學 校 , 瞭 解 其 訓 練 之 過 程 。
九 十 一 年 四 月 台 南 市 消 防 季 刊 第 火 災 原 因 調 查 與 刑 案 偵 火 警 發 生 後 , 最 重 要 者 , 莫 過 於 人 命 救 助 與 災 害 搶 救 , 當 火 勢 撲 滅 後 , 搶 救 過 程 告 一 段 落 時 , 對 於 消 防 工 作 而 言 , 其 接 續 重 點 , 乃 在 火 災 原 因 調 查 。 其
一 ○ 三
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
四 十 三 期
查
重 點 不 僅 在 釐 清 起 火 戶 、 確 認 起 火 處 ,更在於研判起火原因, 火 原 因 , 起 火原因研判後, 火 原 因 研 判 後 , 整 個 火 災 案 件 之 消 防 工 作 程 序 似 已 告 一 段 落 , 而 接 著 乃 為 警 察 機 關 之 刑 案 偵 查 與 移 送 程 序 。
其 實 於 消 防 工 作 中 , 火 災 原 因 調 查 不 應 為 火 警 案 發 生 之 最 後 程 序 , 亦 並 非 刑 案 偵 查 、 移 送 程 序 之 開 端 ; 於 消 防 體 系 中 , 火 災 原 因 確 定 後 , 其 作 用 乃 在 於 眾 多 火 警 案 件 歸 納 其 起火原因,以提供相關消防決策之參考,並減低該類火警 火 原 因 , 以 提 供 相 關 消 防 決 策 之 參 考 , 並 減 低 該 類 火 警 案 件 之 發 生 , 避 免 造 成 更 多 之 人 命 、 財 物 損 失 。 對 於 火 災 案 件 而 言 , 雖 無 法 完 全 避 免 其 發 生 , 並 確 實 消 弭 火 災 , 但 其 發 生 率 及 危 害 程 度 卻 可 加 以 防 制 , 而 消 防 機 關 火 災 原 因 調 查 之 積 極 目 的 亦 於 此 。
至 於 刑 事 偵 查 , 其 主 要 目 的 在 於 確 認 刑 事 責 任 及 民 事 賠 償 , 當 火 警 案 發 生 後 , 刑 事 偵 查 之 程 序 隨 即 展 開 , 無 論 失 火 案 之 調 查 或 縱 火 案 之 追 查 等 。 皆 為 刑 事 偵 查 之 範 疇 , 當 火 首 確 認 後 , 即 可 將 其 移 送 至 司 法 機 關 。 此 追 究 刑 事 責 任 之 過 程 中 , 消 防 機 關 之 火 災 原 因 調 查 報 告 書 雖 可 佐 證 , 協 助 釐 清 火 災 責 任 歸 屬 , 但 此 卻 非 火 災 原 因 調 查 之 主 要 目 的 , 當 然 刑 事 單 位 在 移 送 火 警 案 時 , 亦 可 不 以
一 ○ 四
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
火 災 原 因 調 查 報 告 書 之 內 容 作 為 必 要 佐 證 , 甚 至 司 法 機 關 亦 不 以 此 作 為 追 訴 、 審 判 依 據 。 因 之 , 火 災 原 因 調 查 於 刑 事 、 司 法 過 程 中 , 其 角 色 定 位 乃 在 於 「 證 據 」 。
總 之 , 火 災 原 因 調 查 歸 屬 於 消 防 工 作 範 疇 , 因 其 涉 及 「 火 」 之 災 害 , 而 調 查 之 主 要 目 的 乃 在 於 「 歸 納 其 起火原因以提供相關消防決策之參考,減低該類 火 原 因 以 提 供 相 關 消 防 決 策 之 參 考 , 減 低 該 類 似 火 警 案 件 之 發 生 , 避 免 造 成 更 多 之 人 命 、 財 物 損 失 」 , 而 並 非 提 供 刑 事 、 司 法 機 關 之 佐 證 , 其 主 要 之 角 色 定 位 應 加 以 釐 清 , 畢 竟 對 於 火 警 案 而 言 , 訂 定 良 好 之 防 制 政 策 , 降 低 其 發 生 率 與 損 害 , 遠 較 火 警 案 發 生 後 進 行 追 溯 刑 責 來 得 正 面 、 積 極 。
九 十 一 年 十 月 中 華 民 國 建 築 學 會 建 築 學 報 四 十 一 期 ( 國 立 成 功 大 學 建 築 學 系 王 威 從 建 築 火 災 案 例 探 討 建 築 火 災 人 命 安 全 因 素 之 研 究 │ 以 八 八 十 年 至 八 十 五 年 間 , 我 國 陸 續 發 生 多 起重大火災案例, 重 大 火 災 案 例 , 引 起社會各界普 社 會 各 界 普 遍 重 視 , 促 使 政 府 推 出 對 應 的 防 範 措 施 , 使 八 十 五 年 以 後 單 一 建 築 火 災 造 成 十 多 人 死 亡 之 案 例 已 不 復 見 。 然 而 相 對 於 重 大 火 災 的 減 少 , 一 般 傷 亡 人 數 較 少 之 建 築 火 災 仍 時 有 所 聞 。 本 研 究 探 討 高 雄 地 區 八 十 五 年 一 月 至 八 十 九 年 六 月 之 建 築 火 災 , 瞭 解 建 築 防 火 失 敗 而 造 成 人 員 傷 亡 的 定 性 定 量 因 素 , 作 為 建 築 物 火 災
一 ○ 五
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
仁 、 賴 榮 平、吳 、 吳 宗 儒 )
十 五 年 至 八 十 九 年 高 雄 市 發 生 之 建 築 火 災 為 例
危 險 度 評 估 之 基 礎 。 本 研 究 所 採 用 的 方 法 包 括 : 一 、 文 獻 分 析 法 : 蒐 集 國 內 外 有 關 火 災 人 命 安 全 因 素 之 相 關 文 獻 , 予 以 整 理 、 分 析 , 以 瞭 解 人 命 安 全 因 素 的 選 取 及 分 類 方 法 , 初 擬 本 研 究 之 人 命 安 全 因 素 。 二 、 調 查 研 究 法 : 蒐 集 「 火 災 報 案 記 錄 」 資 料 及 傷 亡 案 例 之 「 火 災 調 查 報 告 書 」 , 用 以 作 為 統 計 之 基 礎 。 三 、 統 計 分 析 法 : 1 、 迴 歸 分 析 (Regression) 2 、 因 素 分 析 (Factor Analysis) 3 、 區 別 分 析 (Discriminate Analysis) 。 本 研 究 所 得 主 要 結 論 如 下 : 一 、 高 雄 市 行 政 區 年 火 災 發 生 次 數 可 利 用 行 政 區 人 口 數 加 以 推 估 。 二 、 從 文 獻 比 較 初 擬 的 十 五 個 安 全 因 素 , 利 用 傷 亡 案 例 資 料 , 以 因 素 分 析 法 篩 選 出 阿 個 較 具 解 釋 力 的 安 全 因 素 , 再 經 區 別 分 析 法 得 到 各 因 素 之 權 重 , 其 中 以 「 防 火 區 劃 」 、 「 隔 間 材 料 」 及 「 封 閉 空 間 」 三 項 因 素 對 人 員 傷 亡 影 響 最 大 , 並 可 根 據 此 三 項 因 素 所 構 成 之 區 別 方 程 式 預 測 傷 亡 案 件 是 否 會 導 致 人 員 死 亡 。 在 四 十 九 件 傷 亡 案 例 中 可 成 功 獲 得 四 十 二 件 案 例 , 分 類 正 確 率 為 八 三 ‧ 六 七 % 。
三 、 獨 棟 住 宅 內 部 各 樓 層 間 並 無 防 火 區 劃 之 設 置 , 使 未 區 劃 之 樓 梯 間 形 成 煙 囪 效 應 , 造 成 起火樓層以上人員 火 樓 層 以 上 人 員 之 死 亡 。
一 ○ 六
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
九 十 一 年 二 月 台 灣 警 察 專 科 學 校 出 版 , 陳 火 炎 、 許 景 盛 、 陳 金 蓮 等 編 著
火 災 原 因 調 查
火 災 原 因 調 查 顧 名 思 義 是 對 火 災 之 調 查 , 因 此 有 必 要 對 火 災 加 以 較 明 確 的 定 義 。
九 十 一 年 學 年 度 國 立 台 北 科 技 大 學 土 木 與 防 災 技 術 研 究 所 簡 萬 瑤 碩 士 論 文 ( 指 導 教 授 : 張 寬 勇 )
老 舊 住 宅 社 區 火 災 防 救 對 策 之 研 究
近 年 來 , 由 於 各 消 防 機 關 針 對 供 公 眾 使 用 之 建 築 物 嚴 格 推 動 執 行 消 防 安 全 檢 查 、 檢 修 申 報 、 防 焰 、 防 火 管 理 等 制 度 , 火 災 傷 亡 人 數 明 顯 下 降 , 而 住 宅 火 災 傷 亡 人 數 卻 一 直 未 見 降 低 , 尤 其 是 老 舊 住 宅 社 區 。 原 因 除 了 火 災 危 險 因 子 未 見 改 善 外 , 民 眾 避 難 逃 生 知 識 不 足 , 以 及 缺 乏 設 置 初 期 火 災 滅 火 設 備 , 也 是 一 大 主 因 。 雖 然 , 內 政 部 頒 布 「 舊 有 建 築 物 防 火 避 難 設 施 及 消 防 安 全 設 備 改 善 辦 法 」 來 改 善 舊 有 建 築 物 。 但 內 容 僅 限 於 供 公 眾 使 用 建 築 物 之 範 圍 , 對 於 實 施 都 市 計 畫 地 區 五 層 樓 以 下 或 非 實 施 都 市 計 畫 地 區 四 層 樓 以 下 之 樓 地 板 面 積 , 未 達 一 千 平方公尺以上之集合住宅(公寓)並未納入;而所訂定之改善辦 方 公 尺 以 上 之 集 合 住 宅 ( 公 寓 ) 並 未 納 入 ; 而 所 訂 定 之 改 善 辦 法 , 亦 因 執 行 上 , 為 避 免 造 成 民 怨 而 一 直 無 法 有 效 改 善 , 大 多 數 的 縣 市 政 府 甚 至 尚 未 訂
一 ○ 七
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
定 相 關 的 分 期 分 區 執 行 計 畫 。 為 瞭 解 老 舊 住 宅 社 區 火 災 防 救 因 難 及 現 存 缺 失 , 本 研 究 選 擇 四 處 老 舊 住 宅 社 區 實 地 調 查 訪 問 , 設 計 問 卷 調 查 再 配 合 消 防 救 災 車 輛 、 人 員 演 練 , 歸 納 火 災 危 害 因 子 及 不 利 消 防 救 災 之 因 素 。 發 現 老 舊 住 宅 社 區 均 面 臨 建 築 物 易 燃 、 防 火 間 隔 不 足 、 巷 道 狹 窄 、 電 線 回 路 超 過 負 載 與 水 源 缺 乏 等 同 樣 問 題 。 因 此 , 本 研 究 以 一 社 區 作 為 案 例 , 檢 討 防 火 缺 失 及 消 防 搶 救 不 易 等 因 素 , 以 防 火 材 料 、 設 備 、 法 規 、 建 築 與 都 市 空 間 、 公 共 安 全 管 理 、 社 區 特 性 、 消 防 搶 救 作 為 等 提 出 具 體 火 災 防 救 對 策 , 冀 望 在 完 整 的 研 究 報 告 提 出 後 , 可 供 相 關 單 位 作 為 推 廣 火 災 防 範 對 策 與 提 昇 消 防 救 災 之 效 能 。
九 十 一 年 學 年 度 國 立 台 北 科 技 大 學 土 木 與 防 災 技 術 研 究 所 何 承 璋 碩 士 論 文 ( 指 導 教 授 : 張 寬 勇 )
住 宅 電 線 火 災 防 制 對 策 之 研 究
國 內 重 大 火 災 事 件 頻 傳 , 每 每 造 成 大 量 的 生 命 財 產 損 失 , 為 抑 制 與 防 制 火 災 的 發 生 , 政 府 部 門 積 極 的 於 政 策 面 修 改 法 令 及 推 動 維 護 公 共 安 全 方 案 外 , 更 不 斷 加 強 宣 導 民 眾 防 火 意 識 及 研 討 火 害 防 治 對 策 。
本 研 究 主 要 內 容 包 括 住 宅 電 線 起火之要因分析、住宅用電使用之現況調查 火 之 要 因 分 析 、 住 宅 用 電 使 用 之 現 況 調 查 及 電 線 試驗三部分。經本研究住宅現況調查,其用電缺失分別為 驗 三 部 分 。 經 本 研 究 住 宅 現 況 調 查 , 其 用 電 缺 失 分 別 為 電 線 及 插 座 老 化 剝 落 現 象 、 延 長 線 任 意 使 用 、 電 線 不 當 搭 接 以 及 電 線 外 露 等 , 普 遍 造 成 住 宅
一 ○ 八
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
電 線 火 災 之 致 災 潛 藏 因 子 。 而 在 電 線 電 流 加 載 實 驗 中 顯 示 , 老 舊 電 線 承 受 電 流 量 較 低 , 約 為 新 型 同 型 電 線 的 九 ○ % 。 因 此 本 研 究 針 對 老 舊 住 宅 , 就 法 規 面 及 災 害 要 因 , 提 出 具 體 之 電 線 火 災 防 制 對 策 , 以 期 減 少 電 線 火 災 之 發 生 。
九 十 年 內 政 部 建 築 研 究 所 第 二 十 三 期 研 究 簡 訊 , 蔡 銘 儒 著 作
重 大 火 災 案 例 調 查 研 究
目 前 國 內 並 無 火 災 建 檔 資 料 庫 , 因 此 無 法 有 效 取 得 重 大 火 災 資 料 進 行 分 析 。 在 本 研 究 過 程 發 現 各 縣 市 資 料 登 錄 並 非 一 致 , 且 用 語 因 人 而 異 … … 故 為 免 事 後 爭 議 , 茲 採 用 消 防 署 目 前 作 為 各 縣 市 通 報 人 數 依 據 之 重 大 災 害 標 準 : 死 亡 二 人 以 上 或 死 傷 十 五 人 以 上 或 房 屋 燒 毀 十 七 戶 ( 間 ) 以 上 或 財 務 損 失 達 五 百 萬 元 以 上 火 警 ; 死 亡 或 失 蹤 三 人 以 上 、 或 死 傷 十 五 人 以 上 之 其 他 災 害 。 重 要 場 所 、 公 共 設 施 發 生 火 警 或 其 它 災 害 者 ; 火 勢 燃 燒 達 二 小 時 以 上 , 損 失 、 傷 亡 一 時 難 以 估 計 , 惟 可 預 期 災 害 損 失 甚 大 者 ; 具 有 影 響 社 會 治 安 顧 慮 之 重 大 火 警 或 受 傷 住 院 之 案 件 ; 有 消 防 人 員 受 傷 或 義 消 人 員 因 公 死 亡 或 受 傷 之 住 院 案 件 ; 其 他 經 救 災 救 護 指 揮 中 心 主 任 或 總 值 日 官 認 有 報 告 必 要 者 。
經 向 各 縣 市 及 消 防 署 洽 詢 結 果 , 目 前 消 防 署 火 災 調 查 組 及 火 災 預 防 組 , 整 理 臺 灣 地 區 七 十 七 年 至 八 十 七 年 七 月 底 重 大 災 害 基 本 檔 案 資 料 , 計 一 百 四 十 八
一 ○ 九
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
例 , 而 災 例 是 最 昂 貴 的 防 火 實 驗 , 建 築 管 理 或 火 災 預 防 行 政 者 , 最 不 願 意 見 到 的 就 是 災 例 不 斷 的 發 生 , 但 「 零 災 害 」 畢 竟 只 是 不 可 能 達 成 之 理 想 , 所 以 一 旦 災 害 發 生 時 , 不 論 建 築 管 理 或 火 災 預 防 行 政 者 都 必 須 記 取 災 例 慘 痛 之 教 訓 , 以 為 將 來 火 災 預 防 、 管 理 或 搶 救 行 政 措 施 之 參 考 依 據 。 本 研 究 基 於 以 往 案 例 資 料 之 不 全 , 以 致 無 法 從 教 訓 中 研 擬 妥 適 之 防 範 對 策 , 故 希 藉 本 研 究 對 以 往 災 例 之 彙 整 , 研 擬 相 關 調 查 表 格 , 並 由 不 幸 之 新 案 例 作 為 填 表 之 改 進 , 以 供 日 後 災 例 發 生 時 填 寫 、 統 計 分 析 及 對 策 研 擬 之 依 據 。
九 十 年 三 月 鼎 茂 圖 書 出 版 股 份 有 限 公 司 出 版 , 廖 茂 為 著 作
火 災 調 查 與 鑑 識 實 務
作 者 以 十 五 年 來 勘 查 心 得 , 配 合 實 際 案 例 , 做 有 系 統 之 歸 納 與 整 理 , 以 提 供 從 事 調 查 之 承 辦 人 員 及 基 層 消 防 人 員 之 參 考 , 另 亦 針 對 常 見 起火原因及造成 火 原 因 及 造 成 傷 害 之 原 因 加 以 分 析 與 建 言 。
九 十 年 台 北 市 政 府 法 規 委 員 會 陳 清 秀 主 任 委 員 著 行 政 機 關 如 何 因 應 行 政 程 序 法 的 施 為 使 行 政 行 為 遵 循 公 正 、 公 開 與 民 主 之 程 序 , 確 保 依 法 行 政 之 原 則 , 以 保 障 人 民 權 益 , 提 高 行 政 為 使 行 政 行 為 遵 循 公 正 、 公 開 與 民 主 之 程 序 , 確 保 依 法 行 政 之 原 則 , 以 保 障 人 民 權 益 , 提 高 行 政 該 法 可 說 是 現 代 法 治 國 家 行 政 程 序 的
一 一 ○
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
述
行
統 一 法 典 化 , 並 具 有 行 政 程 序 標 準 化 的 功 能 , 由 於 該 法 對 於 現 行 法 規 衝 擊 相 當 的 大 , 因 此 各 機 關 均 應 妥 為 因 應 , 除 加 強 公 務 人 員 在 職 進 修 與 訓 練 外 , 也 應 積 極 檢 討 各 個 行 政 法 規 與 行 政 作 業 流 程 , 以 便 遵 守 行 政 程 序 法 的 規 定 。 台 北 市 政 府 並 以 八 十 九 年 九 月 十 九 日 府 法 秘 字 第 八 九 ○ 八 六 二 六 ○ ○ ○ 號 函 發 布 有 「 台 北 市 政 府 因 應 行 政 程 序 法 施 行 先 期 作 業 計 畫 及 應 行 辦 理 事 項 」 , 以 為 因 應 措 施 。
行 政 程 序 法 可 說 是 陽 光 法 案 , 講 求 行 政 程 序 的 透 明 化 。 例 如 : 1 、 禁 止 程 序 外 接 觸 與 關 說 。 程 序 外 接 觸 應 製 作 書 面 紀 錄 附 卷 。 2 、 容 許 當 事 人 與 利 害 關 係 人 閱 覽 卷 宗 。 3 、 資 訊 公 開 。 4 、 法 規 命 令 草 案 之 預 先 公 佈 。 5 、 認 事 用 法 的 行 政 規 則 的 強 制 刊 登 公 報 。 行 政 程 序 法 也 是 民 主 化 的 法 典 , 講 求 行 政 程 序 的 人 民 參 與 。 例 如 : 1 、 當 事 人 於 行 政 程 序 中 , 有 申 請 調 查 事 實 及 證 據 的 權 利 。 2 、 對 於 限 制 及 剝 奪 人 民 自 由 權 利 的 行 政 處 分 , 原 則 上 應 事 先 給 予 表 示 意 見 的 機 會 。 3 、 對 於 法 規 命 令 的 訂 定 及 修 正 , 賦 予 人 民 有 提 議 及 表 示 意 見 的 機 會 。 4 、 行 政 計 畫 的 裁 決 應 經 公 開 聽 證 的 程 序 。 行 政 機 關 可 與 人 民 訂 定 行 政 契 約 , 代 替 行 政 處 分 。
一 一 一
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
下 列 機 關 之 行 政 行 為 , 不 適 用 行 政 程 序 法 之 程 序 規 定 ( 第 三 條 第 二 項 ) ︰ 1 、 各 級 民 意 機 關 。 2 、 司 法 機 關 。 3 、 監 察 機 關 。 下 列 事 項 , 不 適 用 本 法 之 程 序 規 定 ( 第 三 條 第 三 項 ) ︰ 1 、 有 關 外 交 行 為 、 軍 事 行 為 或 國 家 安 全 保 障 事 項 之 行 為 。 2 、 外 國 人 出 、 入 境 、 難 民 認 定 及 國 籍 變 更 之 行 為 。 3 、 刑 事 案 件 犯 罪 偵 查 程 序 : 此 部 份 應 適 用 刑 事 訴 訟 法 的 規 定 , 不 適 用 本 法 。 所 謂 「 犯 罪 偵 查 程 序 」 , 包 括 檢 察 官 與 司 法 警 察 調 查 犯 罪 嫌 疑 人 犯
罪 情 形 及 蒐 集 證 據 的 程 序 。 但 行 政 機 關 進 行 「 行 政 調 查 」 的 程 序 , 其 所 得 資 料 固 可 移 送 檢 察 官 作 為 偵 查 犯 罪 的 參 考 證 據 , 同 時 亦 可 作 為 行 政 上 處 分 的 依 據 , 故 於 此 情 形 , 並 非 「 犯 罪 偵 查 程 序 」 , 似 仍 應 適 用 行 政 程 序 法 的 規 定 。 例 如 政 風 處 調 查 公 務 員 風 紀 的 程 序 、 消 防 局 調 查 火 災 事 故 的 發 生 原 因 與 建 築 主 管 機 關 調 查 建 築 物 倒 塌 原 因 的 程 序 ( 包 括 委 託 技 師 公 會 鑑 定 ) 。 4 、 … … 。
九 十 學 年 度 中 央 警 察 大 學 鑑 識 科 學 研 究 所 黃 壬 鍵 國 內 十 八種 可 燃 性 油 品 之 氣 相 層 析 目 前 國 內 火 災 鑑 定 仍 以 汽 油 、 柴 油 為 主 , 較 乏 其 它 相 關 可 燃 性 液 體 之 鑑 定 資 料 , 故 本 研 究 即 針 對 國 內 十 八 種可燃性油品進行一系列分析,以期能增進縱 可 燃 性 油 品 進 行 一 系 列 分 析 , 以 期 能 增 進 縱 火 劑 殘 跡 之 鑑 識 水 準 。 目 前 用 於 鑑 識 火 場 殘 跡 的 較 佳 方 式 , 仍 以 能 排 除 火 場 基
一 一 二
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
碩 士 論 文 ( 指 導 教 授 : 張 維 敦 )
質 譜 分 析
質 影 響 的 萃 取 離 子 層 析 圖 ( Extracted Ion Chromatogram ; EIC ) 及 標 的 物種 層 析 圖 ( Target Compound Chromatogram ; TCC ) 為 主 。 本 研 究 將 十 八 種可燃 可 燃 性 油 品 按 其 ASTM 分 類 結 果 , 以 靜 態 頂 空 吸 附 法 處 理 後 , 再 以 氣 相 層 析 質 譜 法 測 定 分 析 , 建 立 出 一 套 包 含 總 離 子 層 析 圖 、 萃 取 離 子 層 析 圖 及 標 的 物 種層析圖 層 析 圖 的 可 燃 性 油 品 資 料 庫 。 同 時 並 建 立 出 一 套 可 適 用 於 鑑 識 單 位 的 前 處 理 與 分 析 方 法 , 以 作 為 鑑 定 有 無 可 燃 性 液 體 存 在 的 標 準 程 序 。 結 果 顯 示 , 萃 取 離 子 層 析 圖 與 標 的 物 種層析圖資料庫進行比對鑑定模擬燃燒的火場殘跡,無論是地毯檢 層 析 圖 資 料 庫 進 行 比 對 鑑 定 模 擬 燃 燒 的 火 場 殘 跡 , 無 論 是 地 毯 檢 體 , 或 是 多 孔 性 混 凝 土 檢 體 , 均 可 獲 得 正 確 結 果 。 分 析 兩 種不同可燃性液體混 不 同 可 燃 性 液 體 混 合 縱 火 時 , 除 ASTM 分 類 之 第 一 類 結 果 較 不 明 確 外 , 其 餘 各 類 皆 可 鑑 定 出 混 合 的 可 燃 性 液 體 品 名 。 即 使 增 加 燃 燒 之 燒 燬 程 度 , 干 擾 因 素 亦 不 致 影 響 資 料 庫 的 比 對 鑑 定 結 果 。
火 場 證 物 經 以 氣 相 層 析
質 譜 儀 分 析 之 後 , 如 何 進 行 鑑 定 及 使 用 資 料 庫 的 流 程 , 本 文 擬 定 出 資 料 詮 釋 鑑 析 步 驟 , 一 步 一 步 以 簡 單 問 卷 進 行 研 判 , 希 能 對 火 場 案 件 的 鑑 定 有 更 實 質 的 助 益 。
一 一 三
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
九 十 年 學 年 度 國 立 台 北 科 技 大 學 土 木 與 防 災 技 術 研 究 所 陳 群 應 碩 士 論 文 ( 指 導 教 授 : 施 邦 築 )
地 理 資 訊 系 統 於 火 災 調 查 應 用 之 研 究
傳 統 上 強 調 以 「 救 火 」 為 主 的 消 防 救 災 觀 念 和 作 法 , 已 不 能 滿 足 現 代 民 眾 生 活 安 全 上 的 需 求 ; 為 此 , 可 改 變 思 考 的 方 向 , 更 積 極 地 自 火 災 防 制 基 礎 工 作 之 「 火 災 調 查 」 上 著 手 , 由 防 災 觀 點 來 更 重 視 火 災 調 查 結 果 的 運 用 , 發 揮 其 在 火 災 預 防 、 火 災 搶 救 上 所 帶 來 的 重 要 參 考 性 和 效 益 性 ; 突 破 以 往 火 災 調 查 人 員 僅 憑 個 人 經 驗 法 則 勘 查 火 災 案 件 及 單 純 以 線 性 化 統 計 分 析 火 災 資 料 與 被 動 處 理 縱 火 火 災 的 方 式 , 進 一 步 積 極 運 用 空 間 化 資 料 之 處 理 技 術 及 其 他 可 行 的 分 析 工 具 , 來 協 助 並 促 進 現 行 火 災 調 查 方 法 的 「 系 統 化 」 、 「 數 據 化 」 、 「 實 體 化 」 和 「 正 確 化 」 ; 使 火 災 調 查 所 得 的 結 果 不 但 具 有 提 供 民 、 刑 事 責 任 認 定 之 消 極 功 能 , 而 且 更 能 發 揮 積 極 改 進 火 災 搶 救 技 術 和 提 供 火 災 預 防 有 效 資 訊 上 的 正 面 功 效 。 為 此 , 本 研 究 之 主 要 內 容 是 以 「 小 區 劃 火 場 空 間 內 不 同 分 布 點 物 件 受 燒 變 化 差 異 度 , 研 推 火 流 延 燒 方 向 」 、 「 縱 火 案 件 和 嫌 犯 基 本 資 料 結 合 地 理 資 訊 系 統 , 綜 合 研 析 相 關 特 性 及 尋 求 較 佳 防 制 方 法 」 、 「 火 災 統 計 資 料 採 空 間 化 展 示 及 分 析 」 三 項 子 題 為 主 , 將 火 災 調 查 主 要 工 作 項 目 與 地 理 資 訊 的 概 念 及 方 法 作 一 結 合 運 用 , 希 望 藉 由 系 統 性 之 規 劃 , 使 得 火 災 調 查 的 方 法 及 工 具 在 電 腦 資 訊 化
一 一 四
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
上 , 有 一 較 明 確 可 行 的 運 用 與 發 展 方 向 , 將 來 規 劃 出 的 雛 型 亦 可 再 予 擴 充 成 火 災 調 查 決 策 支 援 系 統 , 整 合 火 災 調 查 其 他 各 項 工 作 使 其 更 加 邁 向 現 代 化 , 期 能 對 於 火 災 發 生 地 點 、 原 因 、 擴 大 延 燒 、 發 生 趨 勢 、 變 化 、 縱 火 模 式 及 提 供 對 策 等 各 方 面 , 有 更 進 一 步 深 入 的 瞭 解 , 作 為 將 來 消 防 行 政 、 防 災 宣 導 、 火 災 搶 救 、 縱 火 防 制 及 勤 務 布 署 上 之 基 石 , 進 一 步 減 少 火 災 、 降 低 損 失 及 遏 止 縱 火 , 達 到 保 障 民 眾 生 命 財 產 安 全 之 目 標 。
九 十 學 年 度 國 立 交 通 大 學 經 營 管 理 研 究 所 林 宜 君 博 士 論 文 ( 指 導 教 授 : 謝 長 宏 、 楊 千 )
台 灣 消 防 人 力 系 統 中 消 防 分 隊 長 之 代 謝 現 象
消 防 組 織 自 從 八 十 四 年 起脫離警察組織後,各縣市消防局陸續獨立成為一 脫 離 警 察 組 織 後 , 各 縣 市 消 防 局 陸 續 獨 立 成 為 一 個 專 責 機 構 後 , 消 防 機 關 人 員 數 量 逐 漸 增 加 , 人 口 組 成 之 素 質 屬 性 亦 愈 來 愈 複 雜 分 歧 。 雖 然 許 多 新 制 度 的 施 行 未 臻 成 熟 , 值 此 起步階段,管理者如 步 階 段 , 管 理 者 如 何 妥 善 規 劃 及 有 效 運 用 消 防 人 力 , 對 消 防 機 關 的 主 政 者 來 說 是 一 大 挑 戰 。 消 防 任 務 執 行 績 效 常 為 問 政 的 指 標 之 一 , 而 分 隊 長 為 執 行 消 防 任 務 的 第 一 線 滅 火 救 災 現 場 指 揮 官 , 其 火 場 狀 況 判 斷 力 與 專 業 救 災 執 行 力 更 直 接 影 響 消 防 人 力 效 能 , 本 研 究 針 對 消 防 人 力 系 統 現 存 問 題 核 心 , 藉 由 問 卷 訪 談 方 式 來 瞭 解 當 前 分 隊 長 人 力 效 能 等 級 , 分 析 分 隊 長 人 力 組 成 結 構 的 演 變 狀 況 , 來 推 估 當 前 分 隊 長 的 代 謝 現 象
一 一 五
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
及 找 出 干 擾 因 素 所 在 , 進 而 推 論 消 防 人 力 系 統 之 演 變 趨 勢 。 研 究 結 果 發 現 , 消 防 人 力 系 統 未 來 可 能 產 生 「 進 多 退 少 」 之 代 謝 不 良 結 果 , 將 造 成 中 層 級 消 防 官 員 難 以 接 替 之 隱 憂 , 使 得 消 防 官 人 力 衰 微 。 因 應 組 織 變 革 及 消 防 工 作 量 倍 增 , 管 理 者 在 進 行 分 隊 長 人 力 之 資 源 管 理 時 , 應 建 立 完 整 的 教 育 體 制 , 使 消 防 人 力 來 源 多 元 化 且 供 給 不 虞 匱 乏 , 並 應 提 升 人 力 素 質 , 以 增 加 人 力 效 能 , 有 必 要 重 新 考 量 我 國 消 防 組 織 各 階 層 最 大 服 務 年 限 與 晉 升 ( 任 ) 條 件 , 建 議 適 時 修 訂 我 國 消 防 人 員 退 休 輔 導 與 人 事 升 遷 制 度 , 俾 助 於 未 來 我 國 消 防 機 關 規 劃 人 力 策 略 時 , 能 避 免 基 層 人 力 不 足 、 中 層 級 消 防 官 斷 層 及 高 層 級 指 揮 官 壅 塞 的 後 遺 症 , 以 暢 通 人 事 升 遷 管 道 , 提 升 消 防 組 織 活 力 。
九 十 學 年 度 私 立 淡 江 大 學 國 際 事 務 與 戰 略 研 究 所 碩 士 論 文 ( 指 導 教 授 : 翁 明 賢 )
台 灣 消 防 安 全 戰 略 之 研 究
人 類 從 蠻 荒 進 步 到 文 明 , 每 天 離 不 開 食 、 衣 、 住 、 行 , 為 了 滿 足 這 四 大 需 求 , 生 活 環 境 除 面 臨 天 然 災 害 之 侵 襲 外 , 還 要 遭 受 人 為 禍害之威脅,人類雖然 害 之 威 脅 , 人 類 雖 然 進 步 到 現 在 文 明 世 界 , 仍 無 法 避 免 天 災 及 人 禍。台灣是一個海島國家,地理位 。 台 灣 是 一 個 海 島 國 家 , 地 理 位 置 處 於 大 陸 型 氣 候 及 海 洋 型 氣 候 中 間 , 夏 秋 季 之 間 進 入 颱 風 季 節 , 常 面 臨 颱 風 災 害 及 水 患 侵 襲 。 且 又 位 處 菲 律 賓 板 塊 及 歐 亞 大 陸 板 塊 交 界 處 , 地 震 災 害 時 有
一 一 六
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
所 聞 。 台 灣 屬 於 亞 熱 帶 氣 候 區 , 適 於 人 類 居 住 , 人 口 稠 密 , 又 因 工 業 及 經 濟 產 業 過 度 發 展 , 人 與 人 之 間 產 生 磨 擦 運 用 各 種方式犯罪,例如縱火、車禍、槍擊 、 槍 擊 案 件 屢 見 不 鮮 , 依 據 消 防 署 統 計 資 料 顯 示 , 九 十 年 各 類 災 害 死 亡 人 數 三 ○ ○ 餘 人 、 財 物 損 失 概 估 約 新 台 幣 一 七 ○ 餘 億 元 。 我 們 仔 細 思 考 , 如 果 平時對於災害 時 對 於 災 害 有 嚴 密 之 防 範 作 為 , 災 害 來 臨 時 , 搶 救 得 法 , 必 可 大 量 減 少 人 命 傷 亡 及 財 產 損 失 ; 近 年 來 許 多 專 家 學 者 致 力 於 災 害 預 防 及 搶 救 作 為 之 研 究 , 期 減 少 人 命 財 產 之 損 失 。 本 文 認 為 消 防 人 員 面 對 災 害 防 救 , 猶 如 軍 人 面 對 敵 人 戰 爭 , 災 害 是 消 防 人 員 永 遠 之 敵 人 , 消 防 人 員 面 對 災 害 , 欲 收 有 效 預 防 及 強 力 搶 救 之 功 , 必 須 研 發 卓 越 的 安 全 戰 略 , 俾 供 消 防 人 員 面 對 災 害 防 救 時 有 可 依 循 之 章 法 , 以 收 事 半 功 倍 之 效 。 本 文 基 於 前 述 之 嚴 重 性 , 特 別 擬 訂 「 台 灣 消 防 安 全 戰 略 」 為 題 目 詳 加 研 究 , 第 一 章 首 先 敘 述 此 一 主 題 之 研 究 動 機 與 目 的 , 說 明 本 篇 論 文 所 使 用 之 研 究 方 法 與 研 究 架 構 , 並 界 定 本 研 究 的 時 間 及 空 間 範 圍 。 第 二 章 說 明 消 防 安 全 戰 略 之 意 義 與 內 涵 , 並 分 析 消 防 戰 略 與 軍 事 戰 略 之 異 同 。 第 三 章 對 美 、 英 、 日 三 國 現 行 消 防 安 全 戰 略 , 與 我 國 現 行 消 防 安 全 戰 略 之 檢 討 , 並 列 舉 卓 越 消 防
一 一 七
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
安 全 戰 略 應 具 備 條 件 。 第 四 章 針 對 火 災 防 救 戰 略 與 戰 術 之 研 究 , 並 對 森 林 火 災 、 船 舶 火 災 、 航 空 飛 機 失 事 、 化 學 災 害 等 搶 救 提 出 特 別 見 解 。 第 五 章 針 對 台 灣
地 區 水 災 、 風 災 、 地 震 等 天 然 災 害 之 防 救 戰 略 與 戰 術 加 以 研 究 。 第 六 章 總 結 研 究 結 論 。 消 防 安 全 戰 略 含 括 災 害 預 防 及 災 害 搶 救 , 從 戰 略 思 考 開 始 到 戰 略 目 標 , 期 預 防 災 害 不 發 生 , 並 消 弭 災 害 於 無 形 。 如 萬 一 災 害 發 生 時 , 可 運 用 正 確 戰 術 有 效 且 快 速 搶 救 , 使 災 害 損 失 降 低 至 最 低 程 度 , 以 達 到 戰 略 終 極 目 的 。 消 防 安 全 戰 略 及 戰 術 之 運 用 屬 於 高 層 次 之 思 維 , 屬 於 搶 救 指 揮 層 級 之 運 用 , 並 且 因 時 空 、 環 境 不 同 必 然 產 生 因 事 、 因 物 、 因 人 不 同 之 戰 略 , 人 類 文 明 不 斷 創 造 發 明 , 以 增 進 人 類 幸 福 , 相 對 地 , 亦 會 產 生 許 多 災 害 , 中 階 以 上 消 防 人 員 應 具 備 高 效 率 之 消 防 安 全 戰 略 及 戰 術 修 養 , 方 能 擔 當 領 導 部 屬 防 救 災 害 , 降 低 災 害 損 失 。
九 十 年 學 年 度 國 立 台 北 科 技 大 學 土 木 與 防 災 技 術 都 會 區 縱 火 災 害 防 制 與 搶 救 對 策 之 台 灣 地 區 隨 著 社 會 環 境 的 快 速 變 遷 , 經 濟 及 科 技 等 各 方 面 的 突 飛 猛 進 , 都 會 區 的 縱 火 犯 罪 在 此 環 境 蘊 育 之 下 , 逐 漸 成 為 嚴 重 的 社 會 問 題 。 根 據 縱 火 案 件 統 計 , 八 十 一 年 僅 四 九 三 件 , 經 比 較 九 十 年 已 增 加 至 一 、 一 二 0 件 , 十 年 來 增
一 一 八
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
研 究 所 徐 文 郎 碩 士 論 文 ( 指 導 教 授 : 林 利 國 )
研 究
加 一 倍 以 上 , 對 於 社 會 公 共 安 全 的 危 害 及 民 眾 生 命 財 產 的 威 脅 , 莫 此 為 甚 。 因 此 , 對 於 現 階 段 縱 火 問 題 , 應 予 高 度 重 視 並 謀 求 防 制 及 搶 救 之 道 。
縱 火 案 件 宛 如 不 定 時 炸 彈 , 具 備 結 果 之 不 確 定 性 、 過 程 動 態 與 持 續 等 犯 罪 特 性 。 在 治 標 方 面 , 對 於 縱 火 者 應 迅 速 偵 破 並 嚴 懲 或 與 社 會 隔 離 , 以 收 嚇 阻 作 用 ; 對 於 身 心 障 礙 、 行 為 偏 差 者 , 相 關 醫 療 院 所 、 矯 正 機 構 應 積 極 輔 導 或 收 容 管 理 。 在 治 本 方 面 , 加 強 全 民 防 火 及 安 全 危 機 管 理 與 預 防 作 為 , 能 於 縱 火 災 害 發 生 時 及 時 避 難 逃 生 , 維 護 生 命 安 全 。 因 此 , 藉 由 政 府 相 關 單 位 的 積 極 防 制 搶 救 作 為 及 提 醒 民 眾 自 我 安 全 的 保 護 , 可 降 低 縱 火 案 件 的 損 失 及 傷 亡 。
本 研 究 以 都 會 區 縱 火 案 例 之 探 討 , 分 析 縱 火 犯 罪 因 素 及 行 為 手 段 , 研 擬 政 府 機 關 、 社 區 里 鄰 、 避 難 逃 生 、 建 構 居 家 安 全 及 消 防 搶 救 等 相 關 防 制 對 策 , 期 望 能 有 效 壓 制 縱 火 案 件 , 建 立 一 個 適 合 我 們 生 存 成 長 、 安 居 樂 業 的 生 活 環 境 。
九 十 學 年 度 國 立 台 北 科 技 大 學 方
禎 璋 碩 士 論 文 ( 指 都 市 老 舊 住 宅 社 區 火 災 防 治 對 策 之 都 市 老 舊 社 區 住 宅 形 成 的 主 因 , 乃 由 於 都 市 經 濟 形 態 的 快 速 成 長 , 大 量 的 就 業 機 會 及 商 機 , 導 致 人 口 急 劇 膨 脹 並 聚 集 於 大 都 會 區 , 使 得 一 般 民 眾 居 住 活 動 間 隔 私 密 性 相 對 縮 小 。 更 由 於 超 量 聚 集 居 住 , 使 得 現 有 老 舊 建 築 物 因 改 建 、
一 一 九
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
導 教 授 : 張
寬 勇 )
研 究
翻 修 不 及 , 而 須 接 受 非 預 期 性 的 納 能 改 變 。 而 相 對 的 亦 產 生 許 多 災 變 , 例 如 ; 火 災 、 傳 染 性 疾 病 、 公 安 事 故 … … 等 等 。 而 在 各 種災害發生的統計結果顯示, 災 害 發 生 的 統 計 結 果 顯 示 , 台 灣 地 區 平均每年因火災而死亡的人數約二百十一人,受傷三百九十人,財物 均 每 年 因 火 災 而 死 亡 的 人 數 約 二 百 十 一 人 , 受 傷 三 百 九 十 人 , 財 物 損 失 達 新 台 幣 ( 下 同 ) 二 十 八 億 元 以 上 , 是 所 有 災 害 之 中 對 人 民 生 命 財 產 損 失 最 大 者 , 且 相 關 調 查 資 料 顯 示 火 災 中 十 之 六 、 七 是 發 生 於 老 舊 住 宅 建 築 物 。 因 此 透 過 系 統 性 調 查 討 論 , 研 擬 如 何 在 現 有 法 令 機 制 所 不 能 限 制 , 或 都 市 更 新 計 晝 尚 未 設 計 , 或 尚 未 改 建 之 老 舊 眷 村 , 以 及 老 舊 國 宅 社 區 , 或 早 期 發 展 但 尚 未 列 入 古 蹟 管 制 之 老 街 … 等 在 短 時 間 裡 無 法 改 善 現 狀 之 建 築 物 , 提 供 火 害 防 制 因 應 對 策 , 降 低 老 舊 社 區 住 宅 火 災 之 發 生 頻 率 , 並 在 不 影 響 現 有 生 活 機 能 及 住 宅 結 構 安 全 的 前 提 裡 , 架 構 出 能 減 少 民 怨 發 生 , 又 能 為 一 般 民 眾 所 樂 於 接 受 、 願 意 修 改 的 「 性 能 性 防 火 」 之 火 害 防 制 理 念 , 無 疑 將 是 政 府 未 來 施 政 重 點 , 亦 是 本 研 究 理 論 基 礎 之 重 心 。
九 十 年 四 月 一 日 內 政 部 林 金 宏 科 美 國 縱 火 調 查 體 系 專 題 本 次 研 習 共 分 二 個 部 分 , 第 一 部 分 是 加 州 大 學 上 課 及 消 防 隊 實 習 , 學 習 火 災 原 因 調 查 的 技 巧 及 要 領 ; 第 二 部 分 是 參 觀 訪 問 , 共 參 訪 華 盛 頓 、 紐 約 、 水 牛
一 二 ○
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
長 公 務 出 國 報 告
研 究
城 等 東 岸 城 市 , 比 較 東 西 岸 有 關 火 災 原 因 調 查 的 制 度 及 作 法 。 美 國 在 縱 火 防 制 上 投 入 大 量 人 力 研 究 , 研 訂 因 應 時 代 需 求 的 具 體 作 法 , 共 發 展 出 縱 火 打 擊 組 織 、 縱 火 調 查 犬 、 縱 火 調 查 手 冊 等 先 進 作 法 同 時 有 非 常 完 整 的 火 災 統 計 資 料 , 藉 以 比 較 整 個 縱 火 防 制 作 為 的 成 效 。 此 外 , 美 國 教 育 訓 練 與 我 國 最 大 不 同 點 , 是 基 層 消 防 人 員 的 養 成 教 育 期 間 , 接 受 的 是 最 實 際 且 最 有 效 率 的 教 導 , 他 們 以 實 際 放 火 燒 房 子 的 方 式 來 進 行 教 育 訓 練 , 讓 每 一 個 消 防 同 仁 養 成 教 育 期 間 就 有 機 會 學 習 如 何 調 查 , 將 來 他 們 一 旦 投 入 工 作 崗 位 , 就 可 發 揮 一 定 之 實 力 , 因 為 他 們 擁 有 真 正 的 調 查 經 驗 , 不 像 我 國 的 養 成 教 育 , 只 會 紙 上 談 兵 , 連 一 個 專 屬 的 訓 練 場 地 都 沒 有 , 包 括 在 實 務 單 位 從 事 火 災 原 因 調 查 人 員 , 常 因 沒 有 紮 實 的 學 習 及 豐 富 的 實 戰 經 驗 , 而 無 法 具 體 研 判 起火處所及原因,實在是一個亟待改 火 處 所 及 原 因 , 實 在 是 一 個 亟 待 改 進 的 制 度 。
八 十 九 年 八 月 二 十 二 日 內 政 部 消 防 署 張 福 綜 視 察
出 席 二 ○ ○ ○ 年 國 際 縱 火 調 查 協 會 國 際 縱 火 調 查 協 會 二 ○ ○ ○ 年 ( 第 五 十 一 屆 ) 年 會 於 五 月 十 五 日 至 十 九 日 在 美 國 密 西 根 州 激 流 市 舉 行 。 消 防 署 為 國 際 縱 火 調 查 協 會 之 會 員 , 有 關 本 屆 年 會 之 心 得 建 議 事 項 如 下 : 一 、 火 災 調 查 人 員 應 廣 納 新 知 。 二 、 培 訓 縱 火 犬 。 三 、
一 二 一
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
公 務 出 國 報 告
年 會
增 進 國 際 間 火 災 調 查 人 員 之 交 流 。 四 、 爭 取 加 入 分 會 。 五 、 加 強 培 養 偵 辦 縱 火 犯 人 員 之 教 育 訓 練 。 經 由 參 加 本 屆 研 討 會 , 得 以 吸 收 國 外 相 關 先 進 知 識 與 技 術 , 透 過 與 國 外 人 員 間 之 交 流 , 交 換 實 務 工 作 經 驗 , 並 藉 由 實 地 的 參 訪 美 國 消 防 機 關 , 瞭 解 美 國 火 災 原 因 調 查 體 制 與 工 作 現 況 , 期 能 在 火 災 原 因 調 查 技 術 之 研 發 及 完 善 調 查 體 制 之 建 立 上 , 有 所 助 益 。
八 十 九 學 年 度 中 央 警 察 大 學 消 防 學 研 究 所 李 育 錫 碩 士 論 文 ( 指 導 教 授 : 黃
季 敏 、 黃 伯 全 )
以 鐵 質 磁 化 原 理 應 用 於 電 氣 火 災 鑑 定 之 研 究
火 災 調 查 鑑 定 工 作 第 一 要 務 即 是 發 現 火 災 原 因 。 在 國 內 近 十 幾 年 來 , 火 災 發 生 原 因 皆 以 電 氣 因 素 高 居 各 類 原 因 之 首 , 有 鑑 於 此 , 筆 者 希 望 能 對 電 氣 火 災 進 行 新 鑑 定 技 術 的 嘗 試,協助電氣火災發生原因的調查工作。本研究係針對短 , 協 助 電 氣 火 災 發 生 原 因 的 調 查 工 作 。 本 研 究 係 針 對 短 路 現 象 引 起的大電流所產生之磁場對其周遭鐵磁質物品的磁化現象,實際量得 的 大 電 流 所 產 生 之 磁 場 對 其 周 遭 鐵 磁 質 物 品 的 磁 化 現 象 , 實 際 量 得 鐵 磁 質 物 品 所 保 持 下 來 的 剩 磁 量 , 更 進 而 量 測 此 剩 磁 量 在 火 場 中 各 種因素(例 因 素 ( 例 如 火 場 高 溫 、 浸 水 、 時 間 以 及 掉 落 震 盪 等 因 子 ) 影 響 後 的 差 異 變 化 值 作 模 擬 實 驗 比 對 分 析 。 此 法 ( 剩 磁 法 ) 應 用 所 需 的 樣 品 易 於 採 取 和 保 留 ; 現 場 檢 測 方 便 、 迅 速 , 可 以 用 來 輔 助 電 氣 火 災 鑑 定 工 作 的 方 法 之 一 。 綜 合 研 究 獲 知 短 路 電 流 磁 化 鐵 質 物 品 應 用 於 電 氣 火 災 鑑 定 , 尚 須 配 合 其 他 調 查 實 驗 分 析 以 及 電 氣 基 本 的
一 二 二
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
數 理 運 算 。 其 雖 無 法 完 全 印 證 一 次 短 路 與 二 次 短 路 的 判 定 , 但 對 於 協 助 電 氣 火 災 鑑 定 , 應 有 些 許 助 益 , 更 期 藉 此 研 究 讓 火 災 科 學 技 術 發 展 持 續 進 行 。
八 十 九 學 年 度 中 央 警 察 大 學 消 防 學 研 究 所 王 靜 婷 碩 士 論 文 ( 指 導 教 授 : 陳 火 炎 、 凌 永 健 )
電 線 短 路 熔 痕 以 二 次 離 子 質 譜 儀 ( SIMS ) 作 表 面 分 析 之 鑑 識 方 法
介 紹 二 次 離 子 質 譜 術 之 演 進 與 發 展 , 並 進 行 銅 質 導 線 短 路 痕 試片樣本製作 片 樣 本 製 作 之 實 驗 設 計 ( 一 次 短 路 痕 試 片 製 作 、 二 次 短 路 痕 試 片製作、三、銅質導線試狀 狀 態 、 四 、 銅 質 導 線 ( 空 白 對 照 組 ) 及 一 次 痕 、 二 次 痕 之 熱 重 分 析 ) 、 二 次 離 子 質 譜 儀 ( SIMS ) 實 驗 操 作 步 驟 及 分 析 條 件 、 銅 質 導 線 熔 痕 之 SIMS 縱 深 分 布 分 析 等 實 驗 與 討 論 。
八 十 八 年 七 月 內 政 部 建 築 研 究 所 出 版 , 鄭 紹 材 著
臺 灣 地 區 住 宅 火 災 發 生 原 因 之 探 討
住 宅 是 民 眾 最 為 熟 悉 的 活 動 場 所 , 但 潛 在 的 危 機 卻 常 被 忽 略 , 從 研 究 的 分 析 , 造 成 住 宅 火 災 災 害 的 因 素 依 屬 性 分 為 不 安 全 行 為 與 不 安 全 的 環 境 , 可 透 過 防 火 教 育 加 強 防 火 認 知 , 以 矯 正 不 安 全 的 行 為 ; 而 自 材 料 、 設 計 、 檢 查 、 保 全 等 工 作 , 減 低 不 安 全 的 環 境 。 因 此 , 從 防 止 起火、避難逃生、控制火災等三方 火 、 避 難 逃 生 、 控 制 火 災 等 三 方 面 , 擬 定 住 宅 防 火 之 預 防 對 策 , 以 減 低 住 宅 火 災 之 發 生 數 與 死 傷 數 。
八 十 七 年 二 月 二 赴 日 研 習 消 本 次 赴 日 研 習 火 災 原 因 調 查 鑑 定 技 術 之 心 得 暨 建 議 , 概 述 如 后 : 一 、 心 得 :
一 二 三
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
十 七 日 內 政 部 消 防 署 徐 文 郎 專 員 、 趙 良 林 專 員 、 張 榮 助 科 員 、 朱 少 龍 技 士 等 公 務 出 國 報 告
防 安 全 設 備 器 材 檢 驗 技 術
( 一 ) 東 京 消 防 廳 組 織 與 調 查 課 編 制 。 ( 二 ) 火 災 調 查 鑑 定 相 關 學 術 研 究 經 過 。 ( 三 ) 日 本 消 防 教 育 訓 練 體 系 。 ( 四 ) 東 京 消 防 廳 都 民 防 災 教 育 訓 練 中 心 之 設 置 。 ( 五 ) 消 防 勤 務 指 揮 中 心 運 作 功 能 。 二 、 建 議 : ( 一 ) 興 建 中 央 鑑 定 實 驗 室 , 提 升 縱 火 案 件 調 查 鑑 定 之 功 能 。 ( 二 ) 設 立 防 災 館 , 作 為 民 眾 防 災 教 育 訓 練 場 所 , 提 升 全 民 消 防 觀 念 。 ( 三 ) 設 置 消 防 學 校 及 訓 練 中 心 , 加 強 在 職 教 育 與 人 才 培 訓 。 ( 四 ) 邀 請 日 本 調 查 鑑 定 專 家 參 與 火 災 調 查 學 術 研 討 , 增 進 學 術 領 域 發 展 。
八 十 七 學 年 度 國 立 成 功 大 學 土 木 工 程 學 系 石 金 明 碩 士 論 文 ( 指 導 教 授 : 邱 耀 正 )
火 災 調 查 基 本 資 料 標 準 化 之 研 擬
由 火 災 案 例 之 探 討 發 現 , 許 多 影 響 火 災 發 展 的 因 素 均 和 法 令 規 定 有 著 重 要 之 關 係 。 如 內 裝 材 料 、 避 難 設 備 、 安 全 門 管 理 等 , 雖 然 法 令 規 定 對 於 公 共 場 所 之 裝 潢 需 採 用 不 可 燃 或 不 易 燃 之 材 料 , 然 大 多 數 業 者 並 未 遵 從 , 以 致 於 火 災 發 生 時 , 火 勢 得 以 迅 速 擴 大 延 燒 , 因 此 對 於 公 共 場 所 之 內 裝 材 料 之 檢 查 , 必 須 要 徹 底 執 行 , 方 得 以 保 障 民 眾 之 生 命 財 產 安 全 。 避 難 設 備 亦 是 如 此 , 法 令 規 定 該 裝 設 避 難 設 備 者 , 業 者 應 予 配 合 。 但 是 , 有 些 場 所 雖 有 裝 設 避 難 設 備 , 然 不 無 明 顯 之 標 示 , 或 者 是 為 其 他 的 雜 物 擋 住 , 當 需 使 用 時 , 常 常 不 知 道 避 難 設 備 在
一 二 四
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
何 處 , 或 是 被 其 他 雜 物 阻 擋 , 無 法 使 用 。 至 於 安 全 門 的 管 理 , 更 是 公 共 場 所 火 災 危 險 相 當 重 要 的 因 素 。 為 管 理 之 方 便 , 公 共 場 所 常 常 只 留 一 處 通 道 , 嚴 重 違 反 了 二 方 向 避 難 之 規 定 , 當 火 災 發 生 在 唯 一 之 通 道 時 , 常 使 內 部 民 眾 無 路 可 逃 , 造 成 很 嚴 重 之 傷 亡 損 失 。
所 以 , 欲 減 少 、 降 低 公 共 場 所 火 災 災 害 之 損 失 , 最 迫 切 的 一 點 , 即 是 對 公 共 場 所 進 行 徹 底 之 勘 查 , 對 於 不 符 合 法 規 規 定 之 情 形 , 應 予 嚴 重 之 處 罰 , 令 業 者 不 得 不 改 善 不 合 格 的 地 方 , 對 民 眾 之 安 全 方 能 有 所 保 障 。 火 災 的 發 生 通 常 包 含 了 多 種的因素之交互作用,要能清楚的釐清各因 的 因 素 之 交 互 作 用 , 要 能 清 楚 的 釐 清 各 因 素 間 之 關 係 是 一 件 極 其 困 難 的 工 作 。 目 前 火 災 災 例 之 分 析 研 究 工 作 , 最 常 遇 到 的 困 難 即 是 火 災 案 例 資 料 之 不 完 全 , 因 為 資 料 的 欠 缺 , 常 導 致 無 法 準 確 的 分 析 火 災 造 成 傷 亡 之 原 因 。 這 也 是 本 研 究 所 極 力 要 求 改 善 的 , 希 藉 由 火 災 調 查 表 格 之 標 準 化 , 提 供 往 後 火 災 分 析 統 計 上 , 更 完 整 、 更 完 備 之 火 災 案 例 資 料 , 使 往 後 之 研 究 能 對 火 災 現 象 有 更 深 層 的 瞭 解 , 進 而 減 少 火 災 對 於 人 們 的 傷 害 。
八 十 六 年 八 月 二 十 八 日 內 政 部 消 前 往 加 拿 大 出 席 「 國 際 縱 值 此 我 國 消 防 工 作 初 萌 之 際 , 派 員 參 加 成 立 四 十 八 年 之 「 國 際 縱 火 年 會 」 , 各 國 之 火 災 調 查 鑑 定 制 度 、 觀 念 制 度 等 , 足 資 我 國 推 展 此 項 工 作 之 參 考 。 本 次
一 二 五
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
防 署 陳 群 應 科 長 公 務 出 國 報 告
火 會 ( IAAI ) 」 工 作 報 告 書
參 加 會 議 為 期 一 星 期 , 謹 將 心 得 摘 要 如 下 : 一 、 瞭 解 火 流 勘 察 要 領 之 重 點 , 在 於 研 判 可 燃 物 、 引 火 源 及 延 燒 過 程 三 項 決 定 性 因 素 。 二 、 吸 取 液 態 縱 火 劑 證 物 前 置 處 理 之 重 要 原 則 與 方 法 。 三 、 蒐 集 發 電 機 故 障 、 氣 囊 爆 炸 等 特 殊 汽 車 火 災 案 例 。 四 、 指 出 計 劃 性 與 非 計 劃 性 連 續 縱 火 犯 特 徵 。 五 、 電 腦 網 路 在 蒐 集 火 災 調 查 適 合 書 籍 期 刊 、 訓 練 機 構 等 資 料 。 六 、 多 倫 多 市 消 防 統 計 資 料 。 七 、 提 出 訂 定 各 種作業手冊、建立專業證照制度、開放民間調查公司、重視人員在職訓 作 業 手 冊 、 建 立 專 業 證 照 制 度 、 開 放 民 間 調 查 公 司 、 重 視 人 員 在 職 訓 練 及 重 視 縱 火 問 題 五 點 建 議 事 項 。
八 十 六 年 二 月 二 十 日 內 政 部 消 防 署 李 明 憲 科 員 、 前 臺 灣 省 政 府 劉 志 華 科 員 、 臺 北 市 政 府 陳 宗 標 股 長 、 高 雄 市 政 府 研 修 日 本 火 調 查 鑑 定 制 度
近 年 來 國 內 工 商 百 業 快 速 成 長 , 加 上 都 市 人 口 急 劇 膨 脹 、 社 會 結 構 、 生 活 形 態 變 遷 快 速 , 且 建 築 物 朝 向 大 型 化 、 樓 層 立 體 化 、 構 造 特 殊 化 、 設 備 複 雜 化 的 工 商 業 社 會 型 態 , 一 旦 發 生 火 災 則 經 常 引 起社會及民眾的慘重損失(人員傷 社 會 及 民 眾 的 慘 重 損 失 ( 人 員 傷 亡 、 財 物 損 失 ) , 依 據 統 計 資 料 顯 示 , 近 十 年 來 , 平均每年發生八千七百七十 均 每 年 發 生 八 千 七 百 七 十 五 次 火 災 , 造 成 二 百 八 十 一 人 死 亡 , 五 百 一 十 二 人 受 傷 , 財 物 損 失 高 達 二 十 七 餘 億 元 外 , 亦 相 對 的 使 火 災 現 象 日 益 複 雜 而 多 樣 化 , 火 災 調 查 工 作 的 困 難 度 也 就 相 對 提 高 ; 而 且 火 災 原 因 調 查 除 關 係 到 起火戶責任歸屬與刑事責任的追究 火 戶 責 任 歸 屬 與 刑 事 責 任 的 追 究
一 二 六
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
黃 永 富 組 長 公 務 出 國 報 告
外 , 並 可 作 為 火 災 預 防 施 政 參 考 。 因 此 , 若 無 豐 富 的 現 場 實 務 經 驗 與 高 度 之 專 門 技 術 , 難 以 應 付 。 消 防 工 作 攸 關 人 民 福 祉 及 生 命 安 全 , 而 火 災 調 查 的 工 作 除 為 政 府 機 關 施 政 參 考 外 , 更 與 人 民 的 權 利 義 務 緊 緊 相 繫 , 鄰 國 日 本 消 防 自 治 體 成 立 迄 今 四 十 八 年 有 餘 , 其 火 災 調 查 的 制 度 與 工 作 的 實 施 足 供 我 國 參 考 。
八 十 六 年 二 月 二 日 內 政 部 消 防 署 王 靜 婷 科 員 公 務 出 國 報 告 ( 行 政 院 人 事 行 政 局 計 畫 )
研 修 日 本 火 災 調 查 鑑 定 制 度
八 十 四 年 三 月 一 日 消 防 署 正 式 成 立 後 , 依 據 消 防 署 組 織 條 例 第 三 、 四 條 明 文 訂 定 設 立 災 害 調 查 組 , 以 掌 理 全 國 災 害 原 因 調 查 、 鑑 定 之 規 劃 、 督 導 及 災 害 現 場 勘 查 、 鑑 定 之 必 要 支 援 事 項 , 值 此 我 國 消 防 工 作 初 萌 之 際 , 鄰 國 日 本 消 防 自 治 團 體 推 行 消 防 工 作 四 十 六 年 有 餘 , 其 有 關 火 災 調 查 鑑 定 制 度 體 系 之 完 整 足 資 我 國 推 展 此 項 工 作 之 參 考 。 本 次 研 修 為 期 四 星 期 , 謹 將 心 得 摘 要 如 下 : 一 、 日 本 火 災 調 查 工 作 之 沿 革 。 二 、 日 本 火 災 調 查 之 組 織 。 三 、 日 本 火 災 調 查 業 務 的 執 行 規 程 之 內 容 。 四 、 日 本 火 災 調 查 各 項 書 類 及 統 計 資 料 之 電 腦 化 處 理 。
八 十 六 學 年 度 中 央 警 察 大 學 消 防 科 學 研 究 所 蔡 旭 銅 質 導 線 金 相 分 析 於 電 氣 火 災 鑑 定 在 火 災 原 因 統 計 中 , 「 電 氣 火 災 」 原 因 一 直 占 有 相 當 高 之 比 例 , 而 對 於 「 電 氣 火 災 」 原 因 之 判 定 , 並 非 只 依 據 火 場 鑑 識 之 原 則 即 能 加 以 確 認 , 而 亦 須 經 由 起 火 點 採 樣 , 藉 由 相 關 證 據 加 以 從 旁 協 助 起 火原 火 原 因 之 研 判 , 如 此 其 「 電 氣 火 災 」
一 二 七
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
棋 碩 士 論 文 ( 指 導 教 授 : 陳 金 蓮 )
應 用 之 研 究
原 因 之 論 點 才 更 具 說 服 力 。 電 導 線 中 , 大 多 數 皆 以 銅 質 導 線 為 之 , 而 藉 由 銅 質 導 線 金 相 實 驗 , 可 對 銅 質 導 線 相 關 之 電 氣 痕 成 因 加 以 探 討 , 不 僅 可 由 導 線 實 體 上 觀 察 各 種電氣痕之跡證,亦可藉由材料實驗方法之「金相分析」深入瞭解銅 電 氣 痕 之 跡 證 , 亦 可 藉 由 材 料 實 驗 方 法 之 「 金 相 分 析 」 深 入 瞭 解 銅 質 導 線 所 形 成 各 種電氣痕時之顯微組織,而藉由顯微組織之判別來辦識銅質導 電 氣 痕 時 之 顯 微 組 織 , 而 藉 由 顯 微 組 織 之 判 別 來 辦 識 銅 質 導 線 是 否 真 為 起 火 原 因 。 於 本 論 文 中 除 介 紹 銅 金 屬 金 相 觀察之各種前處理過程 前 處 理 過 程 外 , 亦 對 於 本 實 驗 所 採 行 之 實 驗 步 驟 、 設 定 條 件 、 應 注 意 事 項 加 以 詳 細 說 明 , 以 使 後 續 研 究 者 免 除 重 複 實 驗 而 困 擾 ; 再 者 , 對 於 熱 痕 、 過 載 痕 、 漏 電 痕 、 一 次 痕 及 二 次 痕 之 試片製作過程、注意事項,亦能對後續研究者提供實驗室製作 片 製 作 過 程 、 注 意 事 項 , 亦 能 對 後 續 研 究 者 提 供 實 驗 室 製 作 各 種 電 氣 痕 試片之方法,雖然與火埸採樣者有些許差異,但其所造成電氣之原 片 之 方 法 , 雖 然 與 火 埸 採 樣 者 有 些 許 差 異 , 但 其 所 造 成 電 氣 之 原 理 卻 相 同 。
在 本 論 文 中 對 於 各 種電氣痕試片實體上之觀察,並比較其差異,以提供銅 片 實 體 上 之 觀 察 , 並 比 較 其 差 異 , 以 提 供 銅 質 導 線 電 氣 痕 之 一 種簡易辨別方式,透過實體顯微鏡即可辨識。除外觀實體上 簡 易 辨 別 方 式 , 透 過 實 體 顯 微 鏡 即 可 辨 識 。 除 外 觀 實 體 上 之 辨 識 外 , 藉 由 銅 質 導 線 之 顯 微 組 織 分 析 、 比 對 , 以 更 確 認 實 體 觀 察 所 獲 得 之 結 論 , 而 以 金 相 分 析 、 比 對 , 鑑 別 一 次 痕 與 二 次 痕 , 甚 至 熱 痕 熔 跡 ( 火 場 最 容
一 二 八
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
易 發 現 之 熔 痕 、 熔 跡 ) 為 本 論 文 之 重 點 , 並 將 觀 察 所 發 現 之 差 異 逐 一 列 之 , 以 為 日 後 辨 識 之 基 本 原 則 , 並 討 論 何 種電氣 電 氣 痕 之 形 成 差 異 較 具 成 災 之 危 險 性 ; 再 者 , 根 據 所 觀 察 之 現 象 , 尋 求 材 料 相 關 文 獻 上 之 解 釋 , 以 作 為 日 後 火 場 熔 跡 、 熔 痕 採 樣 金 相 鑑 定 之 基 礎 。 金 相 分 析 運 用 於 火 災 原 因 鑑 定 , 近 年 來 始 逐 漸 較 有 體 系 之 研 究 , 雖 然 本 論 文 所 觀 察 之 金 相 包 括 空 白 金 相 熱 痕 、 過 載 痕 、 漏 電 痕 、 一 次 痕 與 二 次 痕 , 但 終 究 為 實 驗 室 所 製 作 之 試片,雖然在電氣痕形成之原理相 片 , 雖 然 在 電 氣 痕 形 成 之 原 理 相 同 , 但 於 火 埸 多 變 與 不 確 定 因 素 相 當 多 之 情 形 下 所 造 成 之 試片,難免有其差 片 , 難 免 有 其 差 異 , 故 對 金 相 鑑 定 , 除 應 具 備 基 本 之 金 相 概 念 外 , 對 於 相 關 原 則 亦 應 加 以 熟 悉 , 而 運 用 於 火 埸 取 回 之 試片上,方能更得心應手;此外,應逐漸累積鑑定經驗, 片 上 , 方 能 更 得 心 應 手 ; 此 外 , 應 逐 漸 累 積 鑑 定 經 驗 , 而 將 所 鑑 定 之 試片妥善保存,做成資料庫,以為日後鑑定之參考,如此方能使 片 妥 善 保 存 , 做 成 資 料 庫 , 以 為 日 後 鑑 定 之 參 考 , 如 此 方 能 使 「 電 氣 火 災 」 原 因 之 判 定 更 具 科 學 性 。
八 十 五 年 六 月 一 日 內 政 部 消 防 署 張 博 卿 組 長 公 務 前 往 美 國 出 席 國 際 縱 火 年 會
消 防 署 於 八 十 四 年 三 月 一 日 成 立 , 設 有 災 害 調 查 組 以 為 災 害 原 因 調 查 、 鑑 定 之 規 劃 、 督 導 及 災 害 現 場 勘 查 、 鑑 定 , 為 強 化 此 項 技 術 , 消 防 署 積 極 規 劃 前 往 美 國 參 加 國 際 研 討 會 議 , 以 吸 取 先 進 國 家 專 家 學 者 之 理 論 及 技 術 , 為 期 一
一 二 九
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
出 國 報 告
週 , 謹 將 心 得 及 建 議 摘 要 如 下 : 一 、 心 得 : ( 一 ) 火 災 保 險 與 縱 火 調 查 : 關 於 縱 火 之 調 查 與 防 制 , 在 美 國 是 屬 功 能 聯 合 、 科 際 整 全 之 團 隊 工 作 , 保 險 業 者 積 極 投 入 縱 火 防 制 工 作 , 殊 值 我 國 參 考 。 ( 二 ) 消 防 組 織 : 美 國 地 方 分 權 與 我 國 事 權 統 一 各 有 優 缺 , 互 有 學 習 參 考 之 處 。 ( 三 ) 火 災 調 查 體 系 : 美 國 火 災 調 查 體 系 由 消 警 人 員 通 力 合 作 外 , 保 險 業 者 為 防 範 詐 領 保 險 金 , 亦 可 對 現 場 進 行 調 查 , 擬 提 意 見 供 檢 警 參 考 。 二 、 建 議 : ( 一 ) 會 議 活 潑 多 元 化 。 ( 二 ) 美 國 緊 急 專 用 道 路 規 劃 可 供 我 國 參 考 及 為 利 救 災 運 作 應 嚴 格 執 行 於 消 防 栓 附 近 違 規 停 車 、 設 攤 之 取 締 工 作 。 ( 三 ) 專 業 技 能 人 員 定 期 考 試制度。(四)定期參加國際 制 度 。 ( 四 ) 定 期 參 加 國 際 縱 火 年 會 加 強 交 流 , 除 提 昇 該 項 技 術 外 , 並 提 高 我 國 之 國 際 地 位 … … 。
八 十 三 學 年 度 中 央 警 察 大 學 行 政 警 察 研 究 所 廖 訓 誠 碩 士 論 文 ( 指 導 教 授 : 黃 富 源 )
縱 火 犯 罪 之 研 究 │ 兼 論 縱 火 犯 之 心 理 描 繪
近 年 來 台 灣 地 區 縱 火 案 遽 增 , 平均每天有二點一件在各地發生;而縱火犯 均 每 天 有 二 點 一 件 在 各 地 發 生 ; 而 縱 火 犯 罪 的 劇 烈 性 、 密 集 性 及 高 破 壞 性 , 亦 常 讓 社 會 大 眾 感 到 惶 恐 不 安 。 此 種高頻率 高 頻 率 及 惡 性 重 大 的 犯 罪 型 態 , 值 得 國 內 治 安 單 位 及 政 府 有 關 當 局 重 視 。 在 其 他 國 家 , 縱 火 犯 罪 問 題 似 乎 一 樣 嚴 重 ; 根 據 統 計 , 世 界 二 十 二 個 主 要 都 市 發 生 的 火 災 中 , 就 有 十 五 個 國 家 , 縱 火 為 主 要 起火原因的第一位。縱火犯罪儼然已成為 火 原 因 的 第 一 位 。 縱 火 犯 罪 儼 然 已 成 為
一 三 ○
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
世 界 性 共 同 的 嚴 重 問 題 。 犯 罪 現 象 的 研 究 , 過 去 研 究 者 常 以 統 計 點 或 區 域 抽 樣 問 卷 方 式 , 從 中 暸 解 犯 罪 現 象 , 並 解 釋 犯 罪 行 為 。 然 而 , 研 究 犯 罪 現 象 的 最 直 接 方 式 , 對 犯 罪 者 訪 談 、 觀 察 , 從 犯 罪 心 理 角 度 透 視 其 行 為 潛 在 動 機 及 發 展 過 程 , 卻 甚 少 被 應 用 。 本 研 究 嘗 試藉深度訪談的方法,以微觀角度分析縱火犯的 藉 深 度 訪 談 的 方 法 , 以 微 觀 角 度 分 析 縱 火 犯 的 犯 罪 狀 況 。 研 究 犯 罪 行 為 及 偵 查 技 巧 的 領 域 裡 , 近 十 年 來 逐 漸 重 視 發 展 對 於 嫌 犯 人 格 質 及 行 為 模 式 的 心 理 描 繪 技 術 (Psychological profiling) , 其 內 涵 在 於 整 合 行 為 科 學 、 犯 罪 學 及 偵 查 技 巧 , 其 對 犯 罪 行 為 有 更 深 入 的 瞭 解 。 本 研 究 希 望 藉 由 個 案 訪 談 資 料 , 分 析 縱 火 犯 的 動 機 、 犯 罪 模 式 及 縱 火 犯 人 格 心 理 歷 程 模 組 , 建 立 偵 防 縱 火 犯 罪 的 有 效 資 料 。 這 些 資 料 可
做 為 日 後 國 內 發 展 有 關 「 嫌 犯 人 格 特 徵 描 繪 」 (Criminal Characteristics Profiling) 電 腦 系 統 之 基 礎 檔 案 , 而 有 助 於 警 察 人 員 對 縱 火 犯 罪 之 偵 查 、 鑑 識 及 逮 捕 工 作 。
八 十 二 年 度 內 政 部 建 築 研 究 所 台 建 築 物 災 後 調 查 與 安 全 「 水 可 載 舟 亦 可 覆 舟 」 , 同 樣 的 火 對 人 類 可 有 直 接 的 助 益 , 惟 當 管 理 不 當 或 使 用 不 慎 , 將 可 能 造 成 人 們 生 命 及 財 產 的 損 失 , 尤 其 在 今 天 科 學 技 術 的 進 步
一 三 一
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
南 防 火 實 驗 室 防 火 研 究 計 畫
評 估 方 法 之 研 究
與 高 度 文 明 生 活 的 基 礎 , 「 火 」 的 多 元 化 利 用 應 具 有 一 定 的 貢 獻 ; 然 而 , 當 火 的 作 用 一 旦 發 生 與 運 用 意 旨 相 違 時 , 便 會 造 成 火 災 甚 或 發 生 爆 炸 現 象 , 頓 時 將 使 人 們 在 經 濟 及 生 活 環 境 上 遭 受 破 壞 , 生 命 安 全 更 將 招 致 危 難 。 所 以 , 有 關 建 築 物 火 災 實 為 人 命 安 全 問 題 上 重 要 的 一 環 ,
在 「 預 防 重 於 治 療 」 的 前 提 下 , 有 關 建 築 物 火 災 實 有 必 要 對 其 燃 燒 現 象 及 因 應 對 策 進 行 深 入 的 研 究 , 以 滿 足 民 眾 對 於 居 住 環 境 舒 適 、 安 全 的 殷 切 需 求 。
如 何 就 建 築 物 火 災 的 特 性 , 進 行 系 統 化 的 整 合 性 研 究 , 以 促 成 政 府 部 門 在 執 行 防 火 安 全 政 策 時 , 能 達 人 命 安 全 及 財 物 保 障 的 施 政 目 標 , 是 為 本 研 究 所 欲 推 動 的 目 標 之 一 。 其 次 , 建 立 民 眾 對 公 共 安 全 的 基 本 認 識 , 以 及 奠 定 日 後 從 事 建 築 物 安 全 評 估 工 作 的 基 礎 , 提 供 行 政 部 門 用 以 建 立 公 共 安 全 等 級 評 判 的 依 據 , 亦 為 本 文 寫 作 的 初 衷 。 經 由 公 共 安 全 的 研 究 後 , 以 為 強 制 改 善 安 全 設 施 的 認 定 標 準 。 民 眾 不 但 可 安 心 地 享 受 經 濟 繁 榮 後 物 質
文 明 所 帶 來 的 舒 適 便 利 以 及 充 分 滿 足 「 知 的 權 利 」 , 而 政 府 亦 方 能 落 實 保 障 民 眾 生 命 安 全 和 提 供 「 必 要 安 全 」 的 義 務 。
一 三 二
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
八 十 二 年 內 政 部 建 築 研 究 所 籌 備 處 專 題 研 究 計 畫 成 果 報 告 ( 顏 世 錫 、 倪 秋 煌 、 陳 火 炎 )
建 築 物 火 災 調 查 與 安 全 評 估 法 之 研 究
本 研 究 主 要 是 針 對 「 建 築 物 火 災 」 整 合 性 的 議 題 , 作 一 系 統 化 、 本 土 化 的 深 入 研 討 。 研 究 的 主 題 細 分 為 四 大 議 題 , 依 序 為 : 火 災 原 因 調 查 、 消 防 設 備 調 查 、 建 築 結 構 安 全 調 查 , 以 及 防 火 避 難 調 查 。 並 就 研 究 期 間 ( 八 十 一 年 九 月 至 八 十 二 年 六 月 ) 台 灣 地 區 發 生 的 重 要 火 災 災 例 實 地 調 查 及 記 錄 , 以 歸 納 與 分 析 建 築 物 火 災 的 特 性 , 進 行 系 統 化 、 本 土 化 的 整 合 性 研 究 , 以 促 成 政 府 部 門 在 執 行 消 防 安 全 政 策 時 , 能 達 到 人 命 安 全 及 財 物 保 障 的 施 政 目 標 , 是 為 本 研 究 最 主 要 的 貢 獻 和 目 的 。
八 十 一 學 年 度 中 央 警 察 大 學 警 政 研 究 所 吳 榮 平碩 碩 士 論 文 ( 指 導 教 授 : 簡 賢 文 )
火 災 災 例 分 析 模 式 建 構 之 研 究
近 年 來 國 內 重 大 災 例 頻 傳 , 不 但 造 成 財 物 方 面 的 損 失 慘 重 外 , 人 命 上 的 死 傷 更 是 到 了 令 人 怵 目 驚 心 的 地 步 。 因 此 , 如 何 就 建 築 物 火 災 的 特 性 , 進 行 本 土 化 、 系 統 化 的 整 合 性 研 究 , 以 促 成 政 府 部 門 在 執 行 消 防 安 全 政 策 時 , 能 達 到 人 命 安 全 及 財 物 保 障 的 施 政 目 標 , 是 為 本 研 究 最 主 要 的 目 的 。 而 藉 本 研 究 的 進 行 , 提 供 研 究 的 成 果 , 用 以 教 化 民 眾 公 共 安 全 的 基 本 認 識 ; 以 及 研 究 所 奠 定 的 建 築 物 危 險 度 評 估 基 準 , 提 供 行 政 部 門 用 以 建 立 公 共 安 全 等 級 的 評 斷 依 據 , 並 將 結 果 公 告 民 眾 周 知 。 如 此 , 民 眾 不 但 可 安 心 地 享 受 經 濟 繁 榮 後 物 質 文 明 所 帶
一 三 三
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
來 的 舒 適 便 利 , 以 及 充 分 滿 足 「 知 的 權 利 」 , 而 政 府 亦 方 能 落 實 保 障 民 眾 生 命 安 全 和 提 供 「 必 要 安 全 」 的 義 務 。 因 此 , 藉 由 火 災 案 例 的 調 查 分 析 , 可 歸 納 出 相 關 的 火 災 危 險 要 因 , 進 而 嘗 試引用數理和 引 用 數 理 和 統 計 的 方 法 , 用 以 研 判 可 能 發 生 的 模 式 , 瞭 解 火 勢 延 燒 擴 大 的 現 象 , 構 建 火 災 災 例 分 析 模 式 。 並 且 藉 由 專 家 系 統 建 構 工 具 的 輔 助 , 將 完 整 的 火 災 災 例 分 析 模 式 , 利 用 電 腦 專 家 系 統 的 推 論 及 分 析 功 能 , 必 可 大 幅 提 昇 火 災 調 查 的 能 力 及 效 率 , 充 分 應 用 火 災 災 例 資 料 的 價 值 。
七 十 七 學 年 度 中 央 警 察 大 學 警 政 研 究 所 許 景 盛 碩 士 論 文 ( 指 導 教 授 : 陳 火 炎 )
改 進 台 北 市 火 災 調 查 功 能 之 研 究
火 災 調 查 是 瞭 解 地 區 火 災 問 題 特 性 與 研 擬 消 防 對 策 之 必 要 步 驟 之 一 ; 然 而 , 多 年 來 台 灣 地 區 火 災 調 查 工 作 卻 遲 未 能 發 揮 應 有 的 功 能 , 即 使 消 防 單 位 自 七 十 四 年 起全面接辦火災原因調查工作以來,亦 全 面 接 辦 火 災 原 因 調 查 工 作 以 來 , 亦 僅 著 重 於 「 研 判 起火原因,提 火 原 因 , 提 供 司 法 機 關 偵 查 之 參 考 」 , 而 未 能 藉 以 作 為 火 災 預 防 、 搶 救 及 消 防 行 政 作 業 之 依 據 或 參 考 。
本 研 究 試圖以台灣地區消防制度最完善之台北市為例,探討改進火災調查 圖 以 台 灣 地 區 消 防 制 度 最 完 善 之 台 北 市 為 例 , 探 討 改 進 火 災 調 查 功 能 之 各 項 問 題 ; 首 先 藉 文 獻 探 討 法 , 找 出 相 關 理 論 根 據 , 而 以 比 較 研 究 法 , 找 尋 日 、 美 等 消 防 先 進 國 家 在 火 災 調 查 作 業 方 面 之 現 行 實 務 作 法 , 據 以 研 擬 具
一 三 四
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
體 之 建 議 , 同 時 亦 採 取 問 卷 調 查 方 法 探 討 外 勤 消 防 人 員 對 火 災 調 查 現 況 之 印 象 與 意 見 , 以 印 證 理 論 上 及 經 驗 上 之 假 設 。 本 研 究 之 主 要 發 現 簡 述 如 下 : 一 、 火 災 調 查 對 於 消 防 工 作 的 發 展 極 有 助 益 , 惟 目 前 台 灣 之 火 災 調 查 工 作 未 能 發 揮 應 有 之 功 能 , 亟 待 改 進 。 二 、 台 北 市 之 外 勤 消 防 人 員 對 於 目 前 火 災 調 查 資 料 之 正 確 性 大 都 持 否 定 之 態 度 , 同 時 , 在 調 查 方 法 之 難 易 程 度 及 瞭 解 程 度 上 亦 然 。 三 、 目 前 火 災 調 查 內 容 待 充 實 , 且 應 訂 定 統 一 的 調 查 準 則 及 編 碼 , 以 蒐 集 既 正 確 又 易 於 處 理 的 火 災 調 查 資 料 。 四 、 應 充 分 運 用 電 腦 科 技 及 統 計 方 法 處 理 火 災 調 查 資 料 , 以 呈 現 各 項 資 料 的 意 義 及 彼 此 間 之 關 係 , 並 闡 釋 火 災 之 問 題 與 特 性 , 提 供 研 擬 消 防 對 策 之 依 據 或 參 考 。
七 十 六 學 年 度 中 央 警 察 大 學 警 政 研 究 所 李 清 安 碩 士 論 文 ( 指 導 教 授 : 施 多 喜 、 姜 汽 油 縱 火 於 混 凝 土 地 板 鑑 析 之 研 究
混 凝 土 是 多 孔 質 且 較 吸 附 性 的 物 質 , 故 縱 火 物 若 潑 灑 於 其 上 , 雖 經 火 場 持 續 高 溫 之 作 用 , 然 滲 透 之 部 分 油 量 , 仍 可 能 能 殘 存 , 因 而 如 何 針 對 極 微 量 之 災 後 殘 存 之 滲 透 油 氣 , 做 完 全 、 少 洩 漏 之 收 集 , 俾 供 分 析 之 用 , 以 及 如 何 應 用 GC 、 ICP 、 檢 知 管 及 吸 附 劑 等 分 析 法 , 作 實 地 及 比 較 性 的 鑑 識 研 究 , 乃 本 文 討 論 的 主 要 課 題 , 而 實 驗 結 果 發 現 GC 、 ICP 靈 敏 度 高 , 效 果 極 佳 , 可 直 接 應 用 於 縱 火
一 三 五
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
雲 生 )
鑑 識 實 務 工 作 , 至 於 檢 知 管 及 吸 附 劑 等 方 法 , 雖 然 鑑 識 過 程 較 為 簡 單 , 但 僅 可 運 用 於 汽 油 殘 存 量 較 多 之 小 型 火 災 , 對 於 持 續 高 溫 、 作 用 時 間 較 長 之 火 場 , 其 效 果 並 不 理 想 。 在 本 實 驗 中 亦 嘗 試就縱火過程之可能變項(包 就 縱 火 過 程 之 可 能 變 項 ( 包 括 油 量 滲 透 時 間 之 長 短 、 火 場 持 續 高 溫 作 用 時 間 之 長 短 , 及 採 樣 時 間 之 早 晚 等 變 項 ) 配 合 實 驗 室 控 制 之 模 擬 燃 燒 , 不 僅 使 火 災 之 模 擬 具 有 真 實 性 及 代 表 性 , 更 使 吾 人 對 於 上 列 各 種變項與鑑析結果的關係,有更進一步的了解,有助於吾人從事實際火災 變 項 與 鑑 析 結 果 的 關 係 , 有 更 進 一 步 的 了 解 , 有 助 於 吾 人 從 事 實 際 火 災 調 查 時 , 對 整 個 鑑 析 過 程 的 掌 握 ; 至 於 如 何 從 勘 查 、 採 樣 、 儀 器 分 析 及 結 果 判 辨 的 過 程 中 , 建 立 一 套 完 整 而 簡 便 的 系 統 , 以 供 鑑 識 人 員 參 考 , 乃 本 文 研 究 之 主 要 目 的 。
七 十 五 學 年 度 中 央 警 察 大 學 警 政 研 究 所 林 元 祥 碩 士 論 文 ( 指 導 教 授 : 施 多 喜 )
室 內 裝 璜 壓 克 力 纖 維 釋 煙 性 之 研 究
壓 克 力 纖 維 , 在 室 內 裝 潢 應 用 上 極 為 廣 泛 , 一 旦 發 生 火 災 易 分 解 產 生 殺 人 不 貶 眼 之 煙 , 本 研 究 逐 步 利 用 熱 重 量 分 析 、 氣 相 層 析 分 析 、 質 譜 分 析 、 紅 外 線 光 譜 分 析 及 檢 知 管 等 方 法 , 於 不 同 比 例 不 同 溫 度 下 , 進 行 壓 克 力 纖 維 釋 煙 之 定 性 分 析 , 與 國 外 僅 選 用 特 定 溫 度 下 進 行 者 較 具 系 統 化 , 本 研 究 共 發 現 有 O2,N2,C2H2,CH4,HCN,CO,CO2 等 氣 體 。 壓 克 力 纖 納 用 途 很 廣 、 種類繁多,本研究乃 類 繁 多 , 本 研 究 乃
一 三 六
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
針 對 有 關 釋 煙 之 資 料 加 以 建 立 , 其 他 有 關 資 料 之 累 積 , 仍 有 待 化 學 分 析 之 研 究 , 或 政 府 主 管 機 關 和 壓 克 力 纖 維 製 造 廠 商 建 立 檔 案 資 料 , 提 供 使 用 人 員 參 考 , 進 而 發 揮 保 障 生 命 、 財 產 安 全 之 功 效 , 並 希 能 喚 起從事消防工作者 從 事 消 防 工 作 者 之 注 意 , 加 以 防 範 以 免 中 毒 , 及 引 發 國 人 從 事 更 多 有 關 易 燃 物 質 分 解 或 燃 燒 釋 煙 之 研 究 。
七 十 四 學 年 度 中 央 警 察 大 學 警 政 研 究 所 江 濟 人 碩 士 論 文 ( 指 導 教 授 : 施 多 喜 )
火 災 現 場 痕 跡 分 析 │ 無 機 氧 化 性 物 質 之 鑑 定
火 災 現 場 千 變 萬 化 , 舉 凡 起火物質之種類、數量、建築結構、室內擺設、 類 、 數 量 、 建 築 結 構 、 室 內 擺 設 、 火 場 溫 度 、 持 續 時 間 、 救 災 行 動 、 氣 象 因 素 … … 等 , 皆 可 影 響 火 災 現 場 跡 證 之 是 否 留 存 。 故 欲 模 擬 實 驗 來 觀 察 火 災 現 場 跡 證 之 變 化 , 並 進 行 鑑 定 , 實 為 一 相 當 困 難 且 為 長 期 性 之 研 究 工 作 。 本 研 究 首 先 針 對 無 機 氧 化 性 物 質 之 陰 、 陽 離 子 , 以 濾 紙 層 析 法 、 薄 層 層 析 法 、 呈 色 試驗進行定性分析。希 驗 進 行 定 性 分 析 。 希 望 能 找 出 理 想 的 … … 呈 色 劑 、 呈 色 試劑提供給各地區消防隊參考,使其在極為有限的經費、 劑 提 供 給 各 地 區 消 防 隊 參 考 , 使 其 在 極 為 有 限 的 經 費 、 設 備 、 人 力 下 , 能 對 火 災 可 疑 跡 證 做 初 步 定 性 分 析 。 再 者 , 將 硝 酸 鉀 、 氯 酸 鉀 加 不 同 高 溫 , 持 續 不 同 時 間 後 溶 出 , 以 離 子 層 析 儀 、 原 子 吸 收 分 光 光 譜 儀 , 做 定 量 分 析 檢 測 其 陰 、 陽 離 子 濃 度 變 化 , 以 瞭 解 其 受 熱 分 解 情 形 。 所 有 實 驗 結 果
一 三 七
發 表 時 間 及
來 源 ( 作 者 )
研 究 主 題 ( 篇 名 )
研 究 成 果 及 論 述 內 容 摘 要
可 提 供 實 務 機 關 參 考 , 期 能 有 助 於 火 災 原 因 之 研 判 。
六 十 九 學 年 度 中 央 警 察 大 學 行 政 警 察 研 究 所 廖 哲 賢 碩 士 論 文 ( 指 導 教 授 : 郭 宏 亮 )
電 路 元 件起 火 之 研 究
第 一 章 緒 論 , 首 先 揭 櫫 本 論 文 之 研 究 動 機 與 目 的 , 其 次 為 研 究 範 圍 的 界 定 及 有 關 名 詞 的 詮 釋 。 第 二 章 為 實 驗 , 列 出 其 實 驗 的 材 料 、 步 驟 與 結 果 。 而 實 驗 的 項 目 計 有 : 1 、 線 路 過 載 實 驗 : 包 括 過 載 溫 度 上 升 測 定 及 過 載 起火實驗。2、 火 實 驗 。 2 、 線 路 保 護 實 驗 , 包 括 過 載 保 護 與 短 路 保 護 。 3 、 漏 電 實 驗 。 4 、 短 路 實 驗 等 四 部 分 。 第 三 章 為 討 論 , 係 針 對 實 驗 結 果 加 以 闡 釋 。 第 四 章 為 結 論 , 乃 以 條 列 的 方 式 , 對 電 氣 火 災 的 現 象 及 起因作一綜合性的敘述,期能有助於火災原因之研 因 作 一 綜 合 性 的 敘 述 , 期 能 有 助 於 火 災 原 因 之 研 判 及 有 關 電 氣 因 素 所 引 起的火災之防範。 的 火 災 之 防 範 。
FD06138 | 2004_港澳台_澳门_华榕大厦火警云梯车故障事件_消防局调查报告撮要.md
分类:06_境外及港澳台调查报告 | 年份:2004 | 地域:澳门 | 严重程度: | 场所: | 起火原因:纵火 | 来源格式:md
澳門華榕大廈火警雲梯車故障事件之調查報告撮要
华榕大厦火警云梯车故障事件之调查报告撮要
2004-12-17 20:11:00
来源 : 消防局
本年10月12日华榕大厦7楼C之火警事件,消防局成立三人调查小组,对事件作出全面调查、检讨及建议。
调查小组透过向现场人员、紧急车辆维修专家以及事件相关的人员对事件进行了客观听证,并要求相关部门提供报告以及进行了实地考察等各项调查措施。
- 事件简述 -
於2004年10月12日凌晨,消防局接报发生一宗伤人事件,但由於地址报告有误,以致救援车辆三次出动,经多番转折,最後於04:58消防局才能确定正确的案发位置,获知殷皇子大马路29号华榕大厦7楼,现场有人受伤,於是,本局立即派出火警之车辆,於05:04到达现场,并发现凶徒持刀胁持人质及企图燃爆石油气,故未能与警方即时进入屋内救人,而需进行现场谈判。 其後,於05:15本局人员发现屋内传出有人纵火的迹象,在情势危急的情况下,决定破门入屋,而期间凶徒曾以菜刀袭击消防人员及利用物件顶着大门,企图阻止消防人员入屋拯救,本局人员除即时疏散大量的居民外,还即时展开了救人救火的紧急工作部署。
在是次事件中,本局人员虽然成功强行入屋,但在灭火救人的过程中,曾出现大厦消防系统的不能供水的问题,但最後仍顺利救出了4名伤者。另一方面,於05:26本局人员立刻升起云梯尝试进行拯救,不料期间梯车失灵,指挥官立刻命令启动增援机制,而增援车辆於05:35到达。然而就在准备的阶段时刻,出现操作安全讯号,需要将梯车的操作调整,由於已获悉屋内人仕已被救出,同时在窗口的两名人仕已於05:28安全自行到达平台,因此有关梯车人员转为协助灭火行动。
- 事件分析 -
调查小组就有关事件在收集多方面的资料後,对是次云梯车事故作全方位的分析,并就指挥及灭火拯救工作的执行,车辆失灵是否存在管理、维修保养、检测责任及司机对车辆操作等进行分析。事发後,消防局已即时进行消防局内部车辆检测,同时於本年10月27日安排德国原厂工程师对车辆进行了全面检测,发现於拯救过程中出现故障的云梯车的继电器失效,而据表示,电子零件有别於机械部件,其失效难以单凭表面检查可以检测得到。另外对於事件中增援车辆出现操作的安全讯号,但经其检测後,亦未发现车辆有故障,於11月23日,德国原厰工程师对有关车辆再次检测,也并没有再发现任何问题。此外,本局亦於10月28日派出车辆到火警现场作案情重组,综合各方面的调查分析及专家意见後,认为在指挥官及人员的沟通方面以及对於涉及刑事案件的特殊处理情况方面仍有研究及检讨改善的空间。於华榕事件後本局亦即时检测所有紧急车辆,亦派员到香港交流及汲取学习紧急车辆的维修与保养管理制度。 除此之外,小组认为是次事件显示本局在维修及保养制度方面亦存有不完善的地方。而小组亦对本局的指挥、培训及拯救资源等方面进行全方位的检讨,目的是希望透过建议,改善前线装备及提高各级人员的专业水平,以避免同类事件的再次发生及确保市民的生命及财产的安全。
- 改善建议 -
经调查小组对事件进行详细分析後,就本局现时的拯救工作进行了全面检讨,并作出如下改善建议:
一、 紧急车辆维修保养:
a. 对现有紧急车辆的检测及维修机制作定期检讨,以针对性及有效性地作出改善,并制定完善有关检测、维修的机制。 b. 研究简化车辆维修保养的行政手续。 c. 研究改善现有之车辆维修保养合同,以确保检测质量。 d. 加强人员对车辆的保养培训及监察。
二、 人员培训:
a. 有需要加强培训消防局人员及指挥官对特殊情况,尤其是对刑事案件以至杀人纵火等复杂事件之应变及危机管理能力,并制定相关工作指引。
b. 针对现时紧急车辆驾驶员的培训计划,完善轻型车辆至特别车辆(如云梯车、钢梯车)的永久性培训及考核指引。 c. 针对火警发生率下调,须加强消防人员的灭火能力,并充分利用现有的真火训练基地,以提高消防官及消防人员的指挥和专业灭火技术。
三、 设备改善
a. 小组亦建议对现时消防局火警出勤车队作系统分析及研究,并考虑引入平台水泵车的可能性。 b. 结合澳门路窄及路面的承受能力等客观不利因素作综合评估及分析购买更高及更先进的云梯车的可能。 c. 对现时前线紧急车辆的备用车辆作评估,以考虑增加备用车辆作训练及替换坏车情况。
四、 防火监察
a. 针对事件中大厦消防系统的失修情况,建议向已成立之修改《防火安全规章》工作小组提出对大厦防火巡查、消防系统保养及监察工作等内容作出修改。
b.加强物业管理的防火及责任宣传,以保障大厦居民的生命及财产安全。
五、建议成立三个独立小组长期工作,分别对涉及刑事的紧急救援行动、维修保养制度及更换更先进的云梯车的可行性,三方面作长期的跟进及监察,以完善紧急事故的救援机制。
澳门特别行政区消防局,二零零四年十二月十六日
─ 完 ─
【列印本稿】
下一则:地图绘制暨地籍局代表参与2004两岸四地地理信息系统发展研讨会
上一则:国家主席胡锦涛来澳出席庆回归五周年大会
澳门特别行政区政府新闻局 地址:澳门南湾大马路762-804号中华广场15楼 本局总机:(853) 2833 2886 传真号码:(853) 2833 5426 电邮地址:info@gcs.gov.mo
FD06139 | 2007_港澳台_厦门香港广场工程5·14火灾事故通报.md
分类:06_境外及港澳台调查报告 | 年份:2007 | 地域:厦门 | 严重程度: | 场所: | 起火原因:焊接/动火 | 来源格式:md
厦门市建设与管理局关于香港广场工程5·14火灾事故及处理情况的通报
政策
建设通
政策
资讯
动态
招标
企业库
厦门市建设与管理局关于香港广场工程 “5·14”火灾事故及处理情况的通报
2008-08-28
各有关单位:
2007年5月14日,由中建三局三公司施工、厦门高诚信建设监理有限公司监理、丽新(厦门)房地产开发有限公司开发建设的香港广场工程1#楼发生火灾事故,虽无人员伤亡,但导致厦禾路及思明北路交通中断达2个小时,造成不良的社会影响。当天11时40分左右,火苗从1#楼西北角18楼外脚手架底部串出,并迅速向上部及两侧漫延。施工项目部发现后立即拨打火警电话求救,并迅速启动防火灭火应急预案,组织人员,与随后赶到的消防官兵一同进行灭火抢救。经奋力扑救,大火于13时30分被扑灭。
我局接到火灾事故报告后,立即启动应急预案,会同市安全生产监督管理局、建设工程质量安全监督站,以及思明区政府等有关部门赶往火灾事故现场协调灭火工作。当天下午14:45,我局立即组织我市各高层建筑工程的施工、监理、建设召开火灾事故现场会,分析火灾事故原因,提出防止建筑工程火灾事故的具体要求。现将香港广场工程 “5·14”火灾事故及处理情况的通报如下:
一、 事故原因
(一)直接原因:钢筋班工人曹明燕无证违章作业,在未经项目部审批动火、无人监护、未采取安全防火措施的情况下,使用电焊烧割1#楼屋面构架柱钢筋,熔渣掉落在西北角18楼外脚手架底部引燃竹脚手板和安全网,进而引发火灾。
(二)间接原因
1、该工程项目施工防火设施不符合要求,消防水源使用的立管直径未根据建筑物高度合理配置,至使灭火时水压不足,不能满足灭火需要,延误灭火时机。
二、事故责任处理
1、给予中建三局三公司通报批评、停止在我市参加工程招投标和承接工程业务90天(自5月15日计算,厦建工[2007]70号文停止其在我市参加工程招投标和承接工程业务的截止时间按本文执行)、记入不良行为档案、列为安全生产监管黄色警示处理;给予项目经理刘兴轩通报批评、记入不良行为档案、列入安全生产监管黄色警示,责成公司按内部管理规定给予相应处罚。
2、给予厦门高诚信建设监理有限公司通报批评、停止在我市参加工程招投标和承接工程业务30天(自5月15日计算,厦建工[2007]70号文停止其在我市参加工程招投标和承接工程业务的截止时间按本文执行)、记入不良行为档案、列为安全生产监管黄色警示处理;给予总监理工程师林华民通报批评、记入不良行为档案、列入安全生产监管黄色警示,责成公司按内部管理规定给予相应处罚。
三、中建三局三公司、厦门高诚信建设监理有限公司、丽新(厦门)房地产开发有限公司要认真学习《安全生产法》、《消防法》、《建设工程安全生产管理条例》等法律法规,以及有关安全生产技术标准、规范。进一步完善安全生产管理制度,建立健全并认真落实安全生产责任制,落实施工现场安全生产措施。认真吸取“5·14” 火灾事故的深刻教训,严格按事故“四不放过”原则对该起事故进行处理。加强对全体职工安全生产教育,特别是对一线作业人员的安全生产教育,提高安全防范意识和危险源识别能力,确保安全生产。
二○○七年五月二十九日
[
查询施工企业中标、诚信信息、建造师、资质等诚信报告 立即开通:400-600-3267
[上海市住建委]关于印发《上海市建设工程行政处罚裁量基准(2026年版)》的通知 沪建规范〔2026〕6号
[上海市住建委]关于印发《上海市建设工程消防设计审查验收技术服务管理办法》的通知 沪建规范〔2026〕5号
佛山市住房和城乡建设局关于2026年 第二季度房屋建筑工程施工安全 检查情况的通报
关于对山东省工程建设标准《建筑机电工程抗震技术规程》征求意见的函
关于对拟批准发布的工程建设地方标准《竖向分布钢筋不连接装配整体式混凝土剪力墙结构技术规程》进行公示的通知
ICP证:浙B2-20080280-13 技术支持:筑龙信息
电脑版 手机版
快速VIP注册: 400-600-3267
FD06140 | 2008_台湾_台大医院火灾_监察院纠正案文.pdf
分类:06_境外及港澳台调查报告 | 年份:2008 | 地域:台湾 | 严重程度: | 场所:医院/养老院 | 起火原因:焊接/动火 | 来源格式:pdf
監察院公報【第2653 期】 i ************** 目 錄 ************** 彈 劾 案 一、監察委員黃武次、楊美鈴為江育群 中校身為臺南空軍基地警衛勤務最 高主官,卻未經申請核准及與塔台 完成通聯,擅自駕車穿越機場跑、 滑道管制區,嚴重損及基地飛(地 )安全與國軍主官形象,違失情節 重大,爰依法提案彈劾 ··················· 1 糾 正 案 一、本院內政及少數民族委員會為桃園 縣蘆竹鄉公所於老人安養中心辦理 過程,尚未取得桃園縣政府核准籌 設許可,即率爾辦理統包工程招標 事宜;桃園縣政府未適時指正其尚 未申請籌設許可等違失,爰依法糾 正案 ·········································· 4 二、本院內政及少數民族、交通及採購 委員會為嘉義縣政府辦理「布袋港 多功能港埠建設計畫」,未依法取 得土地開發、造地施工許可及建造 執照前即發包施工,致已完成之設 施迄今無法營運使用而閒置等,爰 依法糾正案 ································· 9 三、本院內政及少數民族、財政及經濟 、教育及文化委員會為國立台灣大 學醫學院附設醫院火災預防不力, 亦未能發揮救災協助功能及有效指 揮疏散;台北市政府消防局對於火 災認定失誤,致該局局長未即時到 場指揮,爰依法糾正案 ················· 13 四、本院財政及經濟委員會為漢翔航空 工業公司未訂定有關BOT 投資專 案作業風險評估作業,可行性及財 務分析徒具形式,既定作業規範顯 有重大闕漏等違失,爰依法糾正案 ··· 21 糾正案復文 一、行政院函復,本院前糾正政府未能 有效整合公、私立就業服務機構體 系,造成就業輔導業務事權不一, 致就業服務績效不彰;職業訓練欠 缺完整體系及評鑑機制,影響訓練 成效等違失案查處情形 ················· 26 巡察報告 一、本院97 年度地方巡察第2 組報告 (高雄市政府) ························ 101 二、本院97 年度地方巡察第3 組報告 (台北縣) ······························ 103 三、本院97 年度地方巡察第9 組報告 (屏東縣) ······························ 104 監察法規 一、訂定「監察院核准罰鍰分期繳納作
監察院公報【第2653 期】 ii 業要點」 ································· 106 二、修正「公職人員財產申報資料審核 及查閱辦法」 ··························· 107 公務員懲戒委員會議決書 一、公務員懲戒委員會對本院所提:交 通部臺中港務局前局長黃清藤因違 法失職案件,依法彈劾案之議決書 · 110 二、公務員懲戒委員會對本院所提:經 濟部水利署河川勘測隊正工程司周 世杰因違法案件,依法彈劾案之議 決書 ······································· 110
監察院公報【第2653 期】 ‧1‧ ***************** 彈 劾 案 ***************** 一、監察委員黃武次、楊美鈴為江育 群中校身為臺南空軍基地警衛勤 務最高主官,卻未經申請核准及 與塔台完成通聯,擅自駕車穿越 機場跑、滑道管制區,嚴重損及 基地飛(地)安全與國軍主官形 象,違失情節重大,爰依法提案 彈劾 監察院 公告 發文日期:中華民國98 年5 月8 日 發文字號:(98)院台業參字第0980705481 號
主旨:為江育群中校身為臺南空軍基地警衛 勤務最高主官,卻未經申請核准及與 塔台完成通聯,擅自駕車穿越機場跑 、滑道管制區,嚴重損及基地飛(地 )安全與國軍主官形象,違失情節重 大,爰依法提案彈劾。 依據:本案經監察委員黃武次、楊美鈴提案 ,依監察法第8 條之規定,經監察委 員葉耀鵬等12 人審查決定成立並公 布;並依監察法第13 條第2 項之規 定,於移送公務員懲戒委員會時公布 之。 公告事項:彈劾案文1 份。 院長 王建煊 彈劾案文 壹、被彈劾人姓名、服務機關及職級: 江育群 憲兵司令部204 指揮部355 營 中校營長 (任職期間:民國 96 年8 月1 日至97 年12 月 16 日,現任憲兵司令部204 指揮部中校後勤參謀官)。 貳、案由:江育群中校身為臺南空軍基地警 衛勤務最高主官,卻未經申請核准及與 塔台完成通聯,擅自駕車穿越機場跑、 滑道管制區,嚴重損及基地飛(地)安 全與國軍主官形象,違失情節重大,爰 依法提案彈劾。 參、違法失職之事實與證據: 一、被彈劾人憲兵司令部204 指揮部355 營(下稱憲兵355 營)即將卸任之營 長江育群中校,於民國(下同)97 年12 月5 日上午駕駛1.6 軍用藍色 主官車,搭載即將接任營長張宏寬中 校實施機場衛哨管制區域現地簡介時 ,既未依規定先行申請取得機場飛管 單位放行之許可,亦未攜帶無線電與 塔台完成通聯,更無視進入管制區之 交管燈號為紅燈,即逕行開車穿越跑 、滑道管制區(詳附件一,見第1 頁 ),迫使一架即將進場降落之經國號 戰機緊急重飛。 二、按憲兵355 營第2 連第16 哨正平哨 正、副哨特別守則(詳附件二,見第 2 頁至第5 頁)第三之(四)點規定 :「嚴禁人員、車輛穿越跑道。」。 復查空軍443 戰術戰鬥機聯隊(下稱 空軍443 聯隊)由於所轄臺南機場於 92 年3 月21 日晚間發生復興航空公 司編號GE543 號航機經塔台許可落 地時,與未經核准侵入跑道工程車碰 撞之嚴重飛安事件,隨即於94 年1 月7 日重行研訂「跑、滑道起降區域 飛行管理標準作業程序」(詳附件三
監察院公報【第2653 期】 ‧2‧ ,見第6 頁至第20 頁),依上開標 準作業程序貳、三「進入跑、滑道起 降區域作業程序及注意事項」規定: (一)各單位執行場面勤務之工作車輛 及人員(包含民間施工人員),須進 入管制區域(跑、滑道、起降區)執 行任務單位,於進入場面前先至飛管 分隊完成登記,飛管分隊值班人員以 專線回報作指中心值班人員,作指中 心值班人員回報科勤官,再由科勤官 請示高勤官獲准後,回覆作指中心值 班人員及飛管分隊值班人員,並由飛 管分隊值班人員宣達:本場飛行動態 、跑道使用方向、值勤時遇飛機進場 之處置等相關注意事項,並填寫「宣 導事項暨場面管制登記簿」;(二)飛 管分隊於獲得高勤官許可進入場面後 ,應與塔台相互確認不影響飛行動態 後,始可放行……;(三)各單位人員 (含車輛駕駛)進入管制區域作業時 ,應攜帶無線電於飛管室現場與塔台 完成通聯後,始得進入管制區域;… …(七)任何未經無線電向塔台提出申 請之車輛,一律禁止行經跑、滑道管 制區……。查97 年12 月5 日上午 11 時41 分,被彈劾人於完成機場衛 哨第16 哨任務說明後,未循律定路 線由外環巡場道路續往跑道另側第 15 哨,既未先行申請取得機場飛管 單位放行之許可,亦未攜帶無線電與 塔台完成通聯,甚而無視進入管制區 之交管燈號為紅燈,即逕行駕車穿越 跑、滑道管制區,顯與上開規定有違。 三、新任營長張宏寬中校於本院約詢時曾 證稱:「即將卸任之江中校於車內告 知,巡查至16 哨時,即須折返,不 可穿越管制區。……」(詳附件四, 見第21 頁至第24 頁);被彈劾人於 本院約詢中亦承認:「營地共有18 哨,其中第7、15 及16 哨等3 處設 置在飛航管制區,但巡查時不會穿越 跑道,當天確有告知新任營長,至第 16 哨即須折返。……」(詳附件五 ,見第25 頁至第28 頁)。由於江員 駕車穿越跑、滑道管制區並無相關勤 務資料及指派單,亦未依規定先行申 請取得放行許可,又未配戴無線電與 塔台完成通聯,復無視跑道管制區之 交管燈號為紅燈,而逕行穿越跑道, 肇致「跑道入侵」事件發生,雖幸飛 輔室值勤人員及早發現,即刻下令已 準備進場降落之經國號戰機重飛,未 造成更嚴重之飛安情事,惟跑、滑道 管制區淨空與飛(地)安維護本應天 衣無縫,決不容任何閃失,憲兵355 營即將卸任之營長江育群中校除個人 未經申請違法駕車穿越機場跑、滑道 管制區外,該營第2 連第16 哨亦未 依規定嚴格執行侵入跑、滑道攔截動 作,江員身為臺南機場地面警衛勤務 最高主官,顯有嚴重違失。 四、空軍第443 聯隊曾於94 年1 月7 日 以平武字第0940000185 號函聯隊所 屬空軍各單位暨防砲警衛司令部第 913 指揮部警衛第8 營等,請確依「 跑、滑道起降區域飛行管理標準作業 程序」執行,以確保飛(地)安全。 復依據國防部94 年3 月22 日略畫字 第0940000358 號令頒「精進案第二 階段指導綱要計畫」,自95 年1 月 1 日起負責臺南機場地面安全勤務之 防砲警衛司令部第913 指揮部警衛第
監察院公報【第2653 期】 ‧3‧ 8 營,正式改隸為憲兵204 指揮部 355 營,並於原駐地以原編原裝執行 原任務。經查憲兵355 營歷任營長各 類移交清冊,尚無「跑、滑道起降區 域飛行管理標準作業程序」項,江員 於憲兵204 指揮部懲處評審會中亦辯 稱:「聯隊自警衛營移撥憲兵後,未 留下任何公文及命令發布可供參閱。 」,渠於本院約詢時亦表示:「當初 移交時確未看到此份公文,但之後輾 轉得知這項規定。」,相關陳述雖因 公文移交及檔案管理嚴重失序難以查 證,惟證諸空軍443 聯隊督察科曾對 憲兵355 營於97 年7 月11 日12 時 45 分進行飛機失事搶救(演習)時 未帶手話機,自行穿越B 滑行道及 36 右跑道之嚴重影響飛安事件開具 缺點改正通知單(詳附件六,見第 29 頁),相關改進建議及辦理情形 均經被彈劾人批示在案;復按憲兵 355 營第2 連第16 哨正平哨正、副 哨特別守則第三之(四)點規定:「 嚴禁人員、車輛穿越跑道。」。故被 彈劾人於初接355 營營長時,縱未目 睹前述標準作業程序之文件,然嗣已 輾轉得知,並於案發當日違規之前, 告知張宏寬中校:「巡查至16 哨時 ,即須折返,不可穿越管制區。」, 其前開辯解,縱屬不虛,亦難解應負 之責。 五、另查臺南機場係屬軍民合用機場,前 因駐防臺南機場之空軍443 聯隊基地 內警衛安全、工程督導、飛安管制與 塔台航管等因執行職務過程輕率敷衍 ,相關勤務訓練不足,飛安意識淡薄 以及軍紀廢弛,於92 年3 月21 日晚 間發生復興航空公司編號GE543 號 航機經塔台許可落地後,與未經核准 逕行侵入跑道工程車碰撞之嚴重飛安 事件,本院調查後,提案彈劾時任少 將聯隊長沈再添等6 人,並經公務員 懲戒委員會議決:記過貳次者3 人, 記過壹次者1 人,申誡者2 人。復興 航空公司,並依國家賠償法對空軍司 令部提起訴訟,求償金額高達新台幣 5 億5 千餘萬元並加計利息,雖因雙 方對於賠償金額計算基礎猶有爭議, 尚待法院審理,惟該事件已嚴重損及 軍民合用機場飛航安全與國軍整體形 象。本次事件雖因飛輔室即時處置得 宜,幸未發生碰撞事件,惟飛(地) 安不容絲毫輕忽草率,被彈劾人擅闖 機場跑、滑道管制區,自屬嚴重違失。 肆、彈劾理由及適用之法律條款: 依據「國軍警衛勤務教範」第一章總則 (詳附件七,見第30 頁至第37 頁)第 ○一○○二條之二、一般警衛勤務規定 :……有關重要軍事首長、機構之安全 ,由憲兵編組警衛部隊擔任之……。復 依第○一○○五條有關衛(哨)兵之重 要性規定:衛(哨)兵為軍隊之耳目, 亦係單位之表徵,關係軍隊之安全與榮 譽至鉅,故應瞭解權責,熟記守則,以 確立執勤之基礎。再依第○一○○六條 有關各級主官職責亦規定,各級主官, 負有衛哨勤務之全責。基此,江員身為 臺南空軍基地配屬單位憲兵355 營營長 ,未熟記衛哨特別守則第三之(四)點 :「嚴禁人員、車輛穿越跑道。」規定 ,擔任臺南基地地面安全警衛勤務主官 近1 年5 個月,況且其於約詢時答稱知 道車輛不可隨意穿越管制區,竟仍違規
監察院公報【第2653 期】 ‧4‧ 駕車逕由滑行道穿越主跑道起降管制區 ,幸因飛輔室及時處置得宜,致未發生 嚴重飛安事件,惟已嚴重危害基地安全 與國軍主官形象。 綜上,被彈劾人違失情節重大,核與公 務員服務法第一條、第五條及第七條所 定,公務員應「依法律命令所定執行其 職務」、「謹慎勤勉」及「執行職務應 力求切實」等規定有違,並有公務員懲 戒法第2 條之應受懲戒事由,爰依憲法 第97 條第2 項、監察法第6 條之規定 提案彈劾,移請公務員懲戒委員會審議。
***************** 糾 正 案 ***************** 一、本院內政及少數民族委員會為桃 園縣蘆竹鄉公所於老人安養中心 辦理過程,尚未取得桃園縣政府 核准籌設許可,即率爾辦理統包 工程招標事宜;桃園縣政府未適 時指正其尚未申請籌設許可等違 失,爰依法糾正案 監察院 公告 發文日期:中華民國98 年4 月28 日 發文字號:(98)院台內字第0981900332 號
主旨:公告糾正「桃園縣蘆竹鄉公所於本案 老人安養中心辦理過程,未恪遵「都 市計畫法臺灣省施行細則」規定,於 尚未取得桃園縣政府核准籌設許可, 即率爾辦理統包工程招標事宜;桃園 縣政府於獲悉蘆竹鄉公所擬辦理統包 工程招標案函文時,未適時指正其尚 未申請籌設許可;桃園縣蘆竹鄉公所 復於3 案規劃完工並取得使用執照後 ,未積極辦理委外營運招標事宜,執 意將3 案規劃再變更合併為1 案,致 營運期程延宕;另桃園縣政府訂頒「 桃園縣都市計畫保護區、農業區土地 使用審查要點」有關「分案」規定, 與內政部89 年10 月17 日函修「臺 灣省都市計畫保護區及農業區設置社 會福利事業設施暨農業區設置幼稚園 土地使用審查要點」顯有牴觸,均有 違失」案。 依據:依98 年4 月22 日本院內政及少數民 族委員會第4 屆第19 次會議決議及 監察法施行細則第22 條規定。 公告事項:糾正案文1 份 院長 王建煊 糾正案文 壹、被糾正機關:桃園縣政府、桃園縣蘆竹 鄉公所。 貳、案由:桃園縣蘆竹鄉公所於本案老人安 養中心辦理過程,未恪遵「都市計畫法 臺灣省施行細則」規定,於尚未取得桃 園縣政府核准籌設許可,即率爾辦理統 包工程招標事宜;桃園縣政府於獲悉蘆 竹鄉公所擬辦理統包工程招標案函文時 ,未適時指正其尚未申請籌設許可;桃 園縣蘆竹鄉公所復於3 案規劃完工並取 得使用執照後,未積極辦理委外營運招 標事宜,執意將3 案規劃再變更合併為 1 案,致營運期程延宕;另桃園縣政府 訂頒「桃園縣都市計畫保護區、農業區 土地使用審查要點」有關「分案」規定 ,與內政部89 年10 月17 日函修「臺
監察院公報【第2653 期】 ‧5‧ 灣省都市計畫保護區及農業區設置社會 福利事業設施暨農業區設置幼稚園土地 使用審查要點」顯有牴觸,均有違失。 參、事實與理由: 桃園縣蘆竹鄉鄉民代表會第16 屆第3 次定期會議決議照案通過籌設鄉立老人 安養中心,以落實對該鄉老人之敬重與 照顧,該代表會於民國(下同)88 年 12 月6 日將上開決議案,函送該縣蘆 竹鄉公所查照辦理。蘆竹鄉公所嗣於 90 年10 月9 日招標辦理「蘆竹鄉立老 人安養中心委託規劃專案研究」,由林 長雄建築師事務所得標,契約金額新台 幣(下同)95 萬元,該所依委託規劃 研究成果,於90 年12 月28 日招標辦 理「蘆竹鄉立老人安養中心統包工程」 ,由佳山營造公司得標,契約金額2 億 4,800 萬元。蘆竹鄉公所係以該鄉坑子 外段山腳小段26 地號「都市計畫保護 區」土地,作為本案安養中心興建基地 ,開發基地面積9,990 平方公尺,該所 原擬以1 案方式辦理規劃籌設,惟囿於 桃園縣政府所訂頒「桃園縣都市計畫保 護區、農業區土地使用審查要點」有關 「申請基地面積不得超過3,000 平方公 尺」及「分案申請設置」規定,蘆竹鄉 公所將原先1 案分割為3 案重為規劃申 請籌設,桃園縣政府則於92 年6 月27 日核准該所以3 案籌設。本案統包工程 於94 年12 月18 日完工,95 年2 月9 日取得3 案使用執照後,蘆竹鄉公所隨 即以3 案規劃將影響廠商投標意願並徒 增營運人事費用等理由,再函請桃園縣 政府同意將變更後3 案再合併為1 案, 桃園縣政府則基於輔導該所儘早開辦及 尊重興辦事業計畫單位決定等理由,嗣 於95 年9 月15 日函復蘆竹鄉公所同意 其將3 家養護中心予以合併,惟消防設 備等應依實際變更。蘆竹鄉公所旋即要 求統包承商著手辦理消防設備變更及使 用執照變更等相關事宜,嗣於97 年11 月3 日桃園縣政府消防局函復該所本案 安養中心消防安全設備符合規定,97 年12 月18 日該府函復該所本案用途更 動准予備查,桃園縣政府並於98 年2 月20 日准予開辦本案老人安養中心, 目前該中心刻正委由財團法人怡德安養 護中心經營,每月權利金36 萬1,688 元。茲據調查就行政監督缺失部分彙陳 意見如后: 一、桃園縣蘆竹鄉公所於本案老人安養中 心辦理過程,未恪遵「都市計畫法臺 灣省施行細則」規定,於尚未取得桃 園縣政府核准籌設許可,即率爾辦理 統包工程招標事宜;另桃園縣政府於 獲悉蘆竹鄉公所擬辦理統包工程招標 案函文時,未適時指正其尚未申請籌 設許可,均有違失: (一)依內政部89 年12 月29 日所訂定 「都市計畫法臺灣省施行細則」第 27 條規定:「保護區為國土保安 、水土保持、維護天然資源及保護 生態功能而劃定,經縣(市)政府 審查核准得為下列之使用:…四、 公用事業、社會福利事業及採礦業 所必需之設施。」蘆竹鄉公所於本 案老人安養中心辦理過程,理應先 擬具興建計畫書,向桃園縣政府申 請籌設許可,並俟獲該府核准籌設 後,始准辦理後續工程發包事宜。 (二)惟查本案興建基地係位於「都市計 畫保護區」,依上開施行細則規定
監察院公報【第2653 期】 ‧6‧ ,蘆竹鄉公所於本案安養中心籌設 過程,應先取得目的事業主管機關 桃園縣政府所核發籌設許可。詎料 ,蘆竹鄉公所於尚未辦理申請籌設 許可,即率爾於90 年12 月28 日 招標辦理「蘆竹鄉立老人安養中心 統包工程」,由佳山營造公司得標 ,負責辦理籌設許可申請、規劃設 計及施工等事宜。針對「公所為何 未先申請籌設許可」部分,詢據該 所行政室主任黃雅蠲說明略以: 「當時公所承辦人員應係不熟悉法 令,致未先辦理籌設許可,即以統 包工程辦理發包,籌設許可申請則 係包含於統包工程內。」 (三)另查蘆竹鄉公所於上開統包工程招 標前,曾於90 年8 月9 日以蘆鄉 秘字第90117575 號函桃園縣政府 略以:「本所辦理『蘆竹鄉立安養 中心』案,依政府採購法第24 條 規定以統包方式辦理,請鈞府同意 ,請鑒核。」桃園縣政府於收受該 函文,交由該府採購中心簽辦並於 同年月15 日以府採審字第410665 號函復該所略以:「貴所辦理『蘆 竹鄉立安養中心』,採整體規劃設 計、施工、供應、安裝、維修之統 包方式辦理乙案,本府原則准予備 查。」;蘆竹鄉公所復於90 年12 月6 日以蘆鄉建字第90128147 號 函桃園縣政府略以:「為辦理『蘆 竹鄉立老人安養中心統包工程』第 1 次工程招標,請派員監標。」桃 園縣政府於收受該函文,即交由該 府社會處簽辦,並於90 年12 月 26 日以府社老字第248681 號函復 略以:「貴所於90 年12 月28 日 辦法『蘆竹鄉立老人安養中心統包 工程』公開招標案,本府不派員參 加,請貴所主計確實依政府採購法 及其相關法令辦理監辦業務。」桃 園縣政府社會處係該府督導社會福 利事業設施之主管單位,其於獲悉 蘆竹鄉公所即將辦理本案老人安養 中心統包工程之招標作業時,顯未 切實查核該所是否已申請並獲核准 籌設許可,致未適時指正其缺失。 (四)據上,蘆竹鄉公所於本案老人安養 中心辦理過程,於尚未取得目的事 業主管機關桃園縣政府核准籌設許 可,即率爾辦理統包工程之招標, 違反都市計畫法臺灣省施行細則第 27 條規定;另桃園縣政府於2 次 接獲蘆竹鄉公所擬辦理本案統包工 程招標函文時,均未查核其是否已 申請籌設許可及符合上開施行細則 有關規定,並適時指正缺失,均有 違失。 二、桃園縣蘆竹鄉公所於3 案規劃完工並 取得使用執照後,未積極辦理委外營 運招標事宜,執意將3 案規劃再變更 合併為1 案,致營運期程延宕,顯有 未洽: (一)本案統包工程,蘆竹鄉公所原擬以 1 案作規劃設計,惟囿於桃園縣政 府91 年3 月29 日所訂頒「桃園縣 都市計畫保護區、農業區土地使用 審查要點」第6 點規定:「申請基 地面積不得超過3,000 平方公尺… 」蘆竹鄉公所將原規劃1 案分為3 案重新規劃籌設,並於92 年3 月 27 日分別以蘆鄉社字第92106543
監察院公報【第2653 期】 ‧7‧ 號、第92106544 號及第92106545 號檢送該鄉鄉立老人安養中心-「 第1 安養中心」、「第2 安養中心 」及「養護中心」之3 案籌設申請 書,函請桃園縣政府審核。桃園縣 政府嗣於92 年6 月27 日以府社老 字第0920141509 號函復該所略以 :「有關貴所申請於本縣蘆竹鄉坑 子外段山腳小段26-3 地號籌設桃 園縣蘆竹鄉立老人安養護中心第1 安養中心、26-4 地號籌設桃園縣 蘆竹鄉立老人安養護中心第2 安養 中心、26-5 地號籌設桃園縣蘆竹 鄉立老人安養護中心-養護中心( 都市計畫保護區)乙案,興辦事業 計畫業經本府相關單位審核完竣, 原則准予籌設。」蘆竹鄉公所嗣於 93 年6 月4 日取得3 案之建造執 照,94 年12 月18 日統包工程完 工後,並於95 年2 月9 日取得桃 園縣政府(95)桃縣工建使字第蘆 336、337 及338 號三案使用執照。 (二)本案統包工程原履約期限為93 年 8 月1 日,因將1 案分割為3 案須 重新規劃籌設,增加籌設申請修改 、建築圖說修改及建造執照重新申 請審查等作業,致完工期程延遲至 94 年12 月。蘆竹鄉公所於取得上 開使用執照後,理應積極辦理委外 營運招標事宜,以免已完工建築物 及設施閒置。惟查該所卻考量「3 案建築物須3 組標準人力,將增加 龐大人事費用,恐無廠商有意願參 與經營」,並委請元智大學社會學 系謝登旺教授提出「蘆竹鄉立老人 安養護中心分、合設立評估意見書 」結論略以:「研究者綜合以上分 析,顯而易見本案未來無論公所自 營或委外經營,其成敗關鍵厥為營 運成本因素,故以併為1 案申設當 為解決問題之不二法門。」該所並 據以請求桃園縣政府同意將已完工 3 案再辦理變更合併為1 案。桃園 縣政府基於尊重蘆竹鄉公所決定, 並於95 年9 月15 日以府社老字第 0950274904 號函復該所略以:「 有關貴所申請將桃園縣蘆竹鄉立老 人『第1 安養中心』、『第2 安養 中心』及『養護中心』,變更設計 合併為『桃園縣蘆竹鄉立老人安養 護中心』…3 家養護中心合併後, 消防設備應依實際變更後要求辦理 。」至此,本案已完工並取得使用 執照之3 棟建築物及相關設施,卻 無法立即投入營運使用,而仍須再 辦理3 棟建築物打通,及其所衍生 消防設備變更及使用執照變更等額 外作業,致營運期程再為延宕至 98 年2 月。針對「3 案完工後,有 無試過委外經營」部分,詢據蘆竹 鄉公所蔡世志課長說明略以:「本 案有A、B、C 三棟,若分隔委外 經營將造成許多困擾(如前庭使用) 。以3 案打通較符合參觀廠商須求 (且多廠商觀摩亦提出),未辦理 過3 案委外招標案。人力、物力、 空間及管理亦較為便利。」該所趙 俞菊蘭鄉長說明略以:「3 案則須 3 個院長及內部醫護管理人員。」 (三)據上,蘆竹鄉公所於3 案規劃完工 並取得使用執照後,卻以3 案經營 「人事成本將大幅增加、打通較符
監察院公報【第2653 期】 ‧8‧ 合參觀廠商需求及惟恐無廠商有意 願經營」為由,未積極嘗試辦理委 外營運招標事宜,以縮短營運期程 ,執意將已完工3 連棟建築物再辦 理打通並變更合併為1 案,後續並 衍生消防設備變更等諸多作業程序 ,致營運期程延宕,顯有未洽。 三、桃園縣政府訂頒「桃園縣都市計畫保 護區、農業區土地使用審查要點」有 關「分案」規定,與內政部89 年10 月17 日函修「臺灣省都市計畫保護 區及農業區設置社會福利事業設施暨 農業區設置幼稚園土地使用審查要點 」顯有牴觸,應再切實檢討: (一)依內政部89 年10 月17 日台內中 營字第77B-8916991 號函修正「 臺灣省都市計畫保護區及農業區設 置社會福利事業設施暨農業區設置 幼稚園土地使用審查要點」第7 點 第2 項規定:「申請基地面積不得 超過3,000 平方公尺。但同一申請 者於同一地號或毗鄰土地申請數家 相關設施,如經縣(市)政府認定 確不影響附近農業生產環境及交通 順暢,且不違背設施設置之相關規 定者,得同意申請設置,惟其申請 基地之面積合計仍不得超過1 公頃 。」另桃園縣政府91 年3 月29 日 府城都字第0910065342 號函發布 「桃園縣都市計畫保護區、農業區 土地使用審查要點」第6 點第1 項 規定:「申請基地面積不得超過 3,000 平方公尺。但同一申請者不 得於同一地號或毗鄰土地同時申請 數家相關設施,惟如經主管單位確 認不影響附近農業生產環境及交通 順暢,且不違背設施設置之相關規 定者,得同意『分案』申請設置, 且其申請基地之面積合計仍不得超 過1 公頃。」二者相較,本案老人 安養中心蘆竹鄉公所原擬申請興建 基地面積9,990 平方公尺,若依內 政部修正審查要點,於不影響附近 農業生產環境及交通順暢,且不違 背設施設置之相關規定者,得允許 以1 案申請籌劃設置,不必分案申 設;惟若依桃園縣政府訂頒審查要 點,本案老人安養中心卻須「分3 案」申請設置,顯見桃園縣政府所 訂頒上開審查要點有關「分案」規 定,係較內政部所訂頒者為嚴苛。 (二)針對「縣府為何要求分案」部分, 詢據桃園縣政府城鄉發展處林國強 技士說明略以:「內政部所頒與縣 府所頒要點,精神上係相同的。」 該府社會處徐淑靜科員說明略以: 「安養中心歷來只有這1 件申請案 」該府社會處張錦麗處長說明略以 :「希望城鄉處作法能與內政部規 定一致,使民間興建過程更為順暢 。法令是否研修,將找城鄉處與公 所共同研議。」該府城鄉發展處林 國強技士說明略以:「法令我們係 業務單位,只要社會處有提出要求 ,城鄉處會配合辦理相關修正事宜 。」 (三)據上,蘆竹鄉公所於本案老人安養 中心辦理過程,原係以1 案辦理規 劃,然囿於桃園縣政府所訂頒「桃 園縣都市計畫保護區、農業區土地 使用審查要點」有關規定,該所將 其原為1 案規劃分割為3 案並重為
監察院公報【第2653 期】 ‧9‧ 規劃籌設申請,並俟統包工程完工 並取得使用執照後,復要求再將3 棟建築物打通並辦理變更合併為1 案,除徒增眾多無謂作業,並延宕 委外營運期程。桃園縣政府就該府 所訂頒上開審查要點有關「分案」 規定,與內政部之規定未合,顯有 牴觸,應再切實檢討改進,以符實 需。 綜上所述,桃園縣蘆竹鄉公所於本案老 人安養中心辦理過程,未恪遵「都市計 畫法臺灣省施行細則」規定,於尚未取 得桃園縣政府核准籌設許可,即率爾辦 理統包工程招標事宜;桃園縣政府於獲 悉蘆竹鄉公所擬辦理統包工程招標案函 文時,未適時指正其尚未申請籌設許可 ;桃園縣蘆竹鄉公所復於3 案規劃完工 並取得使用執照後,未積極辦理委外營 運招標事宜;另桃園縣政府訂頒「桃園 縣都市計畫保護區、農業區土地使用審 查要點」有關「分案」規定,與內政部 之規定顯有牴觸,均有違失。爰依監察 法第24 條提案糾正,移送行政院轉飭 所屬確實檢討改善見復。
二、本院內政及少數民族、交通及採 購委員會為嘉義縣政府辦理「布 袋港多功能港埠建設計畫」,未 依法取得土地開發、造地施工許 可及建造執照前即發包施工,致 已完成之設施迄今無法營運使用 而閒置等,爰依法糾正案 監察院 公告 發文日期:中華民國98 年4 月28 日 發文字號:(98)院台內字第0981900334 號 主旨:公告糾正嘉義縣政府辦理「布袋港多 功能港埠建設計畫」,未依法取得土 地開發、造地施工許可及建造執照前 即發包施工,致已完成之設施迄今無 法營運使用而閒置,耗費公帑新台幣 3 億7,072 萬餘元;該府對蚵架等施 工障礙物未積極採取具體作為在先, 兩度公告該等障礙物遷移作業,未見 公權力落實執行排除及妥處漁民抗爭 在後,復未依合約規定處置工程進度 落後問題,延宕計畫時程。交通部對 於嘉義縣政府執行本計畫及預算執行 情形未訂定管考規定,亦未切實督導 考核,均有違失案。 依據:依98 年4 月22 日本院內政及少數民 族、交通及採購委員會第4 屆第13 次聯席會議決議及監察法施行細則第 22 條之規定。 公告事項:糾正案文1 份 院長 王建煊 糾正案文 壹、被糾正機關:交通部、嘉義縣政府。 貳、案由:嘉義縣政府辦理「布袋港多功能 港埠建設計畫」,未依法取得土地開發 、造地施工許可及建造執照前即發包施 工,致已完成之設施迄今無法營運使用 而閒置,耗費公帑新台幣3 億7,072 萬 餘元;該府對蚵架等施工障礙物未積極 採取具體作為在先,兩度公告該等障礙 物遷移作業,未見公權力落實執行排除 及妥處漁民抗爭在後,復未依合約規定 處置工程進度落後問題,延宕計畫時程 。交通部對於嘉義縣政府執行本計畫及 預算執行情形未訂定管考規定,亦未切 實督導考核,均有違失,爰依法提案糾
監察院公報【第2653 期】 ‧10‧ 正。 參、事實與理由: 本案據審計部函報本院,有關嘉義縣政 府辦理「布袋港多功能港埠計畫」,核 有未盡職責及效能過低情事,其上級補 助機關交通部亦核有未善盡督導考核之 責等情,案經本院調閱交通部、嘉義縣 政府及審計部等相關卷證資料,及迭次 電話洽詢相關機關調查結果發現,上開 二機關均有違失,茲臚列事實與理由如 下: 一、嘉義縣政府辦理「布袋港多功能港埠 建設計畫」,未依法取得土地開發、 造地施工許可及建造執照前即發包施 工,致已完成之設施迄今無法營運使 用而閒置,耗費公帑新台幣(下同) 3 億7,072 萬餘元,洵有怠失。 (一)按內政部民國(下同)82 年4 月 30 日訂定發布之海埔地開發管理 辦法第5 條規定:「海埔地非依本 辦法或其他法令,不得開發或使用 。」同辦法第6 條規定:「海埔地 之開發,應由開發人向當地直轄市 或縣(市)主管機關申請。」及第 14 條第1 項規定:「開發計畫經 審查許可後,開發人應於收受通知 之日起1 年內檢具造地施工計畫、 施工設計書、圖等向省(市)主管 機關申請造地施工許可,經其審查 符合規定,通知開發人簽訂開發契 約,並發給該許可。」 (二)經查,嘉義縣政府辦理「布袋港多 功能港埠建設計畫」,計分為「布 袋港遊艇碼頭一期工程」(下稱一 期工程)、「87 年度布袋港遊艇 碼頭二期工程」(下稱二期工程) 及「布袋遊艇港二期陸域建築工程 」(下稱二期陸域建築工程)等3 案執行,前臺灣省政府交通處分別 於86 年度及87 年度由交通建設基 金編列預算補助該府1 億4,100 萬 元及2 億9,000 萬元,共計補助4 億3,100 萬元: 1.一期工程於86 年6 月12 日完成 工程招標,發包金額(含工程管 理費)9,654 萬元,得標廠商為 進華營造有限公司,契約金額為 9,160 萬元,工程於86 年7 月 24 日開工,88 年11 月15 日完 工,89 年1 月24 日完成驗收, 結算金額為9,056 萬1,049 元, 工程管理費3,606,000 元,設計 監造結算金額為3,334,910 元, 一期工程共計耗費9,750 萬1,959 元。 2.二期工程於87 年6 月30 日完成 工程招標,契約金額為1 億 9,780 萬元,得標廠商為光裕營 造有限公司,工程於87 年7 月 5 日開工,92 年9 月27 日始完 工,92 年12 月19 日完成驗收 ,結算金額為1 億9,641 萬4,338 元、設計監造費用為5,267,663 元、工程管理費1,799,500 元及 空氣污染防制費684,534 元,二 期工程共計耗費2 億416 萬6,035 元。 3.二期陸域建築工程於90 年2 月 23 日完成工程招標,契約金額 為6,450 萬元,得標廠商為華春 營造有限公司,工程遲至92 年 11 月5 日始開工,94 年12 月
監察院公報【第2653 期】 ‧11‧ 24 日完工,95 年6 月15 日完成 驗收,結算金額為 6,111 萬 2,113 元、工程管理費781,441 元、空氣污染防制費109,049 元 、水電外線費494,900 元、已付 設計監造費用1,214,954 元,二 期陸域建築工程截目前為止共計 耗費6,371 萬2,457 元。 4.嘉義縣政府為依據海埔地開發管 理辦法,補辦本計畫開發許可及 土地編定申請案,於93 年4 月 13 日委託東台工程顧問股份有 限公司辦理,契約金額為980 萬 元,後因本計畫內土地報編問題 可依擴大區域計畫方式辦理,遂 於97 年6 月9 日與該公司終止 契約,經結算後給付該公司金額 為5,345,455 元。 (三)嘉義縣政府未依據海埔地開發管理 辦法之規定,於取得土地開發及造 地施工許可前,逕自86 年7 月24 日起陸續進行一期工程及二期工程 ,嗣因該2 件工程執行進度落後, 該府為保留計畫補助款,於辦理後 續之二期陸域建築工程,復又違反 建築法第25 條:「建築物非經申 請直轄市、縣(市)…主管建築機 關之審查許可並發給執照,不得擅 自建造或使用或拆除。」之規定, 在未取得建造執照前,先行發包施 工。嘉義縣政府遲至94 年2 月3 日檢陳海埔地開發許可申請書圖等 資料,函送內政部營建署補辦程序 ,經內政部94 年10 月12 日函示 ,自92 年1 月1 日以後,海埔地 開發申請案需以行政院已核定之興 辦重大開發或建設事業為限,致另 須補送至行政院核定為重大開發或 建設事業後,始能辦理上述作業, 徒增行政作業時程。又該府補辦本 計畫開發申請案,至96 年11 月 29 日始獲行政院同意循區域計畫 法第13 條規定程序辦理區域計畫 之檢討變更,該府現正進行補辦相 關規定程序。本計畫已於95 年6 月完成相關遊艇碼頭設施,惟因該 府辦理程序違誤,致已完成之設施 迄今無法營運使用而閒置,耗費公 帑3 億7,072 萬餘元,洵有怠失。 二、嘉義縣政府對蚵架等施工障礙物未積 極採取具體作為在先;二度公告該等 障礙物遷移作業,未見公權力落實執 行排除及妥處漁民抗爭在後,復未依 合約規定處置工程進度落後問題,延 宕計畫時程,顯有違失。 (一)前臺灣省政府交通處於83 年9 月 全省評選出5 處遊艇碼頭優先開發 地點,嘉義縣布袋港遊艇碼頭為其 中1 處,84 年10 月21 日嘉義縣 政府函送「布袋港多功能港埠建設 計畫」至前臺灣省政府交通處,請 該處補助經費,該處於84 年12 月 1 日函復嘉義縣政府,將於86 年 度交通建設基金編列1 億9,000 萬 元補助該府辦理本計畫各項工作。 86 年7 月24 日一期工程開工後, 因處理蚵架等障礙物引發漁民抗爭 ,致工程延宕約5 個月,其後該府 雖於86 年12 月31 日公告自即日 起至87 年2 月15 日止自行遷(拖 )離,以免影響工程施工進行,如 屆時仍未自行拖離,為利工程進行
監察院公報【第2653 期】 ‧12‧ ,該府將視為廢棄構造物逕為處置 ,不負任何補償,惟該府未確實執 行公告內容。致同工址二期工程於 87 年7 月5 日開工後,再次遭遇 抗爭拖延施工進度,嘉義縣政府於 87 年12 月22 日再次公告限期遷 離及研議強制拖離,惟仍未能排除 施工障礙,此為一、二期工程工期 延滯之主因。 (二)依據二期工程契約第24 條第1 項 第2 款規定,施工廠商逾規定期限 尚未開工,或開工後工程進行遲緩 ,作輟無常,或工作能力薄弱及工 料設備不足,顯可預見不能如期竣 工者,嘉義縣政府得終止合約。查 二期工程於87 年7 月5 日開工, 合約規定完工日期為89 年9 月24 日,據設計監造單位88 年9 月10 日函文,當時承包商施工進度已嚴 重落後32.894%,且至89 年7 月 12 日止,承包商仍未進場施作, 此期間該府未適時依上開規定妥適 處理,任由工程停滯近1 年後,始 於89 年8 月21 日行文承包商終止 合約,嗣因承包商不服該府終止合 約,於90 年2 月2 日向行政院公 共工程委員會提出履約爭議調解, 該會於90 年10 月8 日提出調解成 立書,嘉義縣政府同意依承包商所 提趕工計畫重新核定給予250 日曆 天工期繼續施作。復工後,漁民以 符合法令規定設計之航道寬度過窄 ,將影響航行安全為由再度抗爭而 造成停工,該府歷經近1 年之協調 未果,最後仍配合漁民要求辦理變 更設計,致使二期工程延至92 年 9 月27 日始完工,較合約規定完 工期程延宕3 年餘,且導致後續辦 理之二期陸域建築工程於90 年2 月23 日簽約後,亦因漁民抗爭問 題,延至92 年11 月5 日始開工, 延宕2 年9 個月餘始施工。 (三)綜上,由於本計畫工址為海域,既 有蚵架為實際存在之施工障礙物, 自前臺灣省政府交通處84 年12 月 1 日核定補助,至一期工程於86 年 7 月24 日開工,期間長達1 年7 個月餘,未見嘉義縣政府積極採取 具體作為在先;該府二度公告施工 障礙物遷移作業,亦未見公權力落 實執行排除及妥處漁民抗爭在後, 復未依合約規定處置工程進度落後 問題,延宕計畫時程,顯有違失。 三、交通部對於嘉義縣政府執行本計畫及 預算執行情形未訂定管考規定,亦未 切實督導考核,確難辭其咎。 (一)按行政院89 年9 月14 日訂頒、90 年1 月1 日施行之「中央對直轄市 及縣(市)政府補助辦法」第17 條規定:「中央政府各主管機關列 有對直轄市、縣(市)政府補助款 者,應按補助計畫性質,訂定補助 計畫及預算執行管考規定,並切實 督導補助計畫及預算之執行,…」 91 年12 月31 日修正、92 年1 月 1 日施行之同辦法第14 條亦有「 中央政府各主管機關對直轄市、縣 (市)政府請求中央補助事項,應 依下列規定辦理:…四、應就核定 後補助事項之計畫及預算執行情形 訂定管考規定,並切實督導考核, …」之規定。另「中央政府各主管
監察院公報【第2653 期】 ‧13‧ 機關對於直轄市、縣(市)政府依 規定所獲分配之計畫型補助款,應 就其計畫及預算執行情形訂定管考 規定,並切實督導考核。… 」係 92 年8 月1 日行政院發布生效之 「中央對直轄市及縣(市)政府申 請計畫型補助款補助之處理原則」 第9 點載有明文。 (二)交通部函復本院有關督導查核嘉義 縣政府辦理本計畫情形為:該部除 督請該府本於權責妥處外,對於工 程之執行亦請該府積極趕辦,另該 部就該府函報二期陸域建築工程時 ,因已考量既經該府多次召開會議 審查及協調,對於造成工程延宕相 關事項業已妥適處理,並已積極趲 趕,而尊重該府處理方式。惟查交 通部於88 年7 月1 日臺灣省政府 組織精簡後,承受本案之處理,基 於計畫具延續性原則,於89 年7 月29 日同意繼續補助嘉義縣政府 辦理二期陸域建築工程,對於該府 未能妥處蚵架等施工障礙遷移及漁 民抗爭等問題,肇致計畫項下二期 工程及二期陸域建築工程之執行進 度落後,嚴重延宕計畫建設期程, 該部督考嘉義縣政府相關措施,僅 係於94 年1 月20 日核復嘉義縣政 府同意相關預算保留時,一併提請 該府「積極趕辦」等語,其餘未有 實質督導考核意見。 (三)綜上,交通部自88 年7 月1 日承 受本案之處理,迄95 年6 月15 日 二期陸域建築工程完成驗收止,期 間長達近7 年,並未依前揭行政院 訂頒之補助辦法及處理原則,「應 就其計畫及預算執行情形訂定管考 規定,並切實督導考核」之規定, 對嘉義縣政府進行實質督導考核, 確難辭咎。
三、本院內政及少數民族、財政及經 濟、教育及文化委員會為國立台 灣大學醫學院附設醫院火災預防 不力,亦未能發揮救災協助功能 及有效指揮疏散;台北市政府消 防局對於火災認定失誤,致該局 局長未即時到場指揮,爰依法糾 正案 監察院 公告 發文日期:中華民國98 年4 月28 日 發文字號:(98)院台內字第0981900337 號
主旨:公告糾正「國立台灣大學醫學院附設 醫院火災預防不力,擅自關閉地區火 警鈴,且未落實消防安全設備之維護 管理及檢修申報,亦未能發揮救災協 助功能及有效指揮疏散;且台北市政 府消防局對於火災認定失誤,致該局 局長未即時到場指揮,均有疏失」案。 依據:依98 年4 月22 日本院內政及少數民 族、財政及經濟、教育及文化委員會 第4 屆第2 次聯席會議決議及監察法 施行細則第22 條規定。 公告事項:糾正案文1 份 院長 王建煊 糾正案文 壹、被糾正機關:國立台灣大學醫學院附設 醫院、台北市政府消防局。
監察院公報【第2653 期】 ‧14‧ 貳、案由:國立台灣大學醫學院附設醫院火 災預防不力,擅自關閉地區火警鈴,且 未落實消防安全設備之維護管理及檢修 申報,亦未能發揮救災協助功能及有效 指揮疏散;且台北市政府消防局對於火 災認定失誤,致該局局長未即時到場指 揮,均有疏失,爰依法提案糾正。 參、事實與理由: 國立台灣大學醫學院附設醫院(下稱台 大醫院)東址院區於民國(下同)80 年9 月落成啟用,係供病患住院、檢驗 、手術之用,並設有急診區。97 年12 月17 日晚上7 時22 分發生火災,造成 4 間手術室損毀,病患張憲雄被搶救至 加護病房即出現心肺衰竭現象,仍於同 年月18 日凌晨0 時5 分死亡,並有13 位醫護人員及駐衛警遭濃煙嗆傷,引起 社會重大關注。案經本院辦理現場履勘 、詢問相關人員及舉行專業諮詢會議, 並調取相關卷證審閱,業已調查竣事, 茲臚列本案相關違失事項如下: 一、台大醫院火災預防不力,對於既存已 久之危險因子未能汰舊換新,造成一 發不可收拾之大火,核有疏失。 (一)按醫療法(75 年11 月24 日制定 公布)第11 條第3 項規定:「醫 療機構之設置標準,由中央衛生主 管機關定之。」依據「醫療機設置 標準」附表(一)綜合醫院建築物之 設計、構造與設備規定,應符合建 築法及其有關法規規定。台大醫院 東址院區係於77 年間依據建築法 第24 條規定,公有建築應由起造 機關將決定之建築計畫、工程圖樣 及說明書,向台北市政府主管建築 機關請領建築執照。並依同法第 28 條第1 項第1 款規定,以符合 建築技術規則建築設備編第3 章規 定之消防設備,因新建建築物而請 領建造執照,當時並不適用內政部 78 年7 月31 日以台警字第715824 號令訂定「各類場所消防安全設備 設置標準」,亦不適用內政部85 年5 月29 日函頒之「建築物室內 裝修管理辦法」,合先敘明。 (二)依據「建築物公共安全檢查簽證及 申報辦法」第3 條規定,辦理建築 物公共安全檢查簽證,應製作檢查 報告書,其中報告書「二、檢查紀 錄(一)防火避難設施類3、內部裝 修材料」之檢查核對內容訂有「無 材料不符」、「有使用許可」及「 與原核准圖說符合」等項目。惟查 台北市政府消防局所提火災原因調 查鑑定指出,台大醫院東址院區4 樓手術室旁之醫材庫房南側污走道 天花板,係將日光燈組設置於溝槽 內作為間接光源,溝槽頂板係以木 板材質裝修,經綜合研判起火原因 以日光燈因故短路引燃周邊可燃物 ,致起火燃燒之可能性較大。 (三)詢據台大醫院工務室查復,日光燈 成本每支17 元,開刀房之日光燈 若有故障,經電話通知換修,電工 房即派員更新,依日光燈的使用壽 命,平均每年日光燈均換修1 次, 當初日光燈設計為間接光源,溝槽 都是木板材質裝修,非為新設裝修 。台大醫院正進行更換公共區之日 光燈為省電照明設備,但開刀房為 管制區,尚未更新云云。有關起火 原因之專家諮詢意見略以:「火災
監察院公報【第2653 期】 ‧15‧ 發生必須具備火源、可燃物及空氣 三要件,醫院建築之天、地、牆等 固定之內裝材料均應為不燃材料, 所以一般不將天花板內視為起火點 ,而設定起火點為天花板下之移動 式可燃物,故將熱、煙等探測器設 置於天花板上並無不妥,且國外亦 同。因此火災預防方面,內裝材料 之澈底不燃化是重點,亦要加強注 意電器用品之選用、管理維護及避 免過負載使用。」 (四)據上,台大醫院97 年12 月17 日 發生火災之原因,係因日光燈座內 部配線短路,引燃木板製作之安裝 溝槽,顯見該院未重視火災預防工 作,未有完善之電器設備管理機制 ,且對於既存已久之危險因子未進 行汰舊換新,造成一發不可收拾之 大火,核有疏失。 二、台大醫院建築防火區劃不佳,擅自關 閉地區火警鈴,且未落實消防安全設 備之維護管理及檢修申報,致火警探 測通報失效,顯有疏失。 (一)按消防法第6 條第1 項第1 款規定 ,依法令應有消防安全設備之建築 物,其管理權人應設置並維護其消 防安全設備;同法第9 條第1 項規 定:「依第6 條第1 項應設置消防 安全設備場所,其管理權人應委託 第8 條所規定之消防設備師或消防 設備士,定期檢修消防安全設備, 其檢修結果應依限報請當地消防機 關備查。」依據「各類場所消防安 全設備檢修及申報作業基準」規定 ,醫院等場所每半年應委託消防設 備師或消防設備士辦理檢修申報, 另依「消防機關受理消防安全設備 檢修申報及複查注意事項」規定, 台大醫院屬規定之甲類場所,每年 應至少複查1 次以上,以查核消防 專技人員是否落實檢修,及消防安 全設備是否維持正常功能之使用狀 態。 (二)查台北市政府消防局火災原因調查 鑑定書指出提及:「火警分區以第 24 區先發報,其次約3 秒後第23 區、第25 區、第22 區均發報,此 4 區幾乎是同時發報,考量第24 區醫材車一帶為長走道結構,第 23 區、第25 區及第22 區應不可 能在如此短暫時間(約3 秒)即發 報,排除起火位置為天花板下方醫 材車一帶。又因天花板至樓板間約 有1.5 公尺之距離,初期火勢若侷 限於天花板以上高度,煙、熱蓄積 在上部(天花板與樓板間),煙、 熱水平延伸並蓄積在樓板下方,並 延伸至第23 區、第25 區、第22 區,當煙、熱向下蓄積,直至天花 板下方之探測器受熱後同時發報。 」是以,火警探測器於火災發生初 期並未發揮應有功能。 (三)又查消防署支援協助本案勘查火場 情形摘要表,對於消防安全管理問 題之記載:「台大醫院考量各樓層 病人安全及恐因誤報造成避難驚慌 ,故火警受信總機之地區警鈴平時 是關閉的,造成起火處現場之地區 警鈴並未同時動作。…起火處(污 走道)上方原有撒水頭均已受燒嚴 重變形,且未進行撒水動作,經現 場找尋發現該撒水區之自動警報逆
監察院公報【第2653 期】 ‧16‧ 止閥疑似故障關閉。…此棟係77 年建造,80 年取得使用執照,建 築物本身僅設有梯間排煙,尚無室 內排煙設備,且管道間貫穿防火區 劃之孔隙係以鏤空鐵板設置,致濃 煙並無法於第一時間排出。」 (四)有關消防安全設備之檢測,詢據台 大醫院表示:「每年1 月、4 月、 7 月及10 月消防安全設備檢修申 報,台大醫院以公開招標方式委由 廠商辦理。」又查台大醫院97 年 7 月7 日制定消防防護計畫之附表 5「消防安全設備檢查紀錄表」之 項別「自動撒水設備」勾選「符合 」、「火警自動警報設備」亦勾選 「符合」。再查台大醫院97 年2 月4 日院長室晨會執行追蹤表,有 關東址中控室24 小時皆有專人監 控,一旦火警警報時人員能立即反 應,從東址大樓啟用至今,均採在 火警警報系統功能正常運作情形下 ,僅關閉其中之地區音響,其他功 能均正常警戒,倘遇有警報發生, 中控室會有主警鈴動作,值班人員 會依消防標準作業程序通知消防班 、駐警隊、東址電工房現場查明處 置,確定屬真火警後,才會將地區 警鈴送出,併通知總機廣播。是以 ,台大醫院平時即將地區火警鈴全 面關閉,未能確保消防安全設備是 否正常運作,造成4 樓手術室醫護 人員均未聽到警鈴聲響。 (五)火災之發生往往起於星星之火,若 能儘早探知火災之發生,即可進行 滅火搶救之因應措施,並增加避難 逃生之可用時間,本案屬電能轉變 而發生熱之電氣火災,日光燈座內 部配線短路係因電器通電部與電線 導體相互接觸,或因電線兩極間同 時接觸其他之導體,造成大量電流 通過而產生銅線熔解之短路現象, 自火源產生而無焰著火、發焰著火 、起火至最盛期,其過程時間之長 短係受火災原因之種類、發生之場 所位置、空氣供應之條件及建築物 之造等因素所影響。 (六)綜上,初期火勢雖侷限於天花板與 上部樓板間,在探測器未感測到煙 與熱之情況下,因管道間貫穿防火 區劃之孔隙係以鏤空鐵板設置,防 火區劃不佳,造成24 區等4 個分 區之煙熱蓄積;復以探測器感應到 火警訊號時,地區警鈴並未同時動 作,且起火處受燒最嚴重之撒水頭 ,未進行初期滅火之撒水動作,導 致正在手術室開刀之醫護人員無法 於第一時間得知火警訊息,而延誤 緊急避難之黃金時間。是以,台大 醫院建築防火區劃不佳,擅自關閉 地區火警鈴,且未落實消防安全設 備之維護管理及檢修申報,致火警 探測通報失效,顯有疏失。 三、台大醫院初期滅火無效、通報機制失 靈,未提供火場動線及人員受困之訊 息,亦未引導消防人員至災害現場, 且未能發揮救災協助功能,明顯與消 防防護計畫所載事項不符,均有未當。 (一)按消防法第13 條第1 項規定:「 一定規模以上供公眾使用建築物, 應由管理權人,遴用防火管理人, 責其製定消防防護計畫,報請消防 機關核備,並依該計畫執行有關防
監察院公報【第2653 期】 ‧17‧ 火管理上必要之業務。」同法施行 細則第15 條第1 項規定:「消防 防護計畫應包括自衛消防編組…火 災及其他災害發生時之滅火行動、 通報聯絡及避難引導等事項。」又 依醫院緊急災害應變措施及檢查辦 法第5 條規定:「醫院發生緊急災 害時,應立即採取應變措施,並迅 速聯繫警察、消防、衛生及其他有 關機關,即時支援搶救。」 (二)查台大醫院97 年7 月7 日制定消 防防護計畫之附件8「自衛消防編 組表」有指揮班、通報班、警戒班 、滅火班及避難引導班,任務內容 包括:1、指揮班要向消防隊提供 情報,引導至災害現場,重點:「 指引往起火場所之最短通道、引導 至進出口…有無受困者、受傷者。 」2、通報班要向消防機關通報, 並確認已通報,重點:「火災!在 中山南路7 號○樓,附近有聯合辦 公大樓,在○樓的○病房燃燒。報 案人電話:23123456 轉(分機號 )。」…4、滅火班要指揮地區隊 (使用滅火器、消防栓)展開滅火 工作,並與消防隊連繫並協助之。 …必要裝備:「各居室、避難出口 之萬用鑰匙…其他必要之器材。」 又該計畫之附表3「防火避難設施 自行檢查紀錄表」檢查重點6「安 全門未上鎖」,檢查結果為「符合 」。惟詢據台北市政府消防局第一 時間到達現場之搶救人員指出:「 依據報案資料顯示,救災車輛應從 林森南路台大醫院籃球場進入,到 達現場人員已看到火舌從窗戶冒出 ,即自行破壞1 樓安全門後,立即 從東南側部署水線上4 樓,此時4 樓防火門無法由外開啟,同仁從旁 邊打開管道間門,發現矽酸鈣隔板 有煙及火焰冒出,判定此處可能是 起火點,由同仁破壞矽酸鈣隔板, 射水攻擊火點。…我們在第1 時間 無法找到醫院相關人員,甚至我曾 詢問醫院人員4 樓開刀房從哪個樓 梯可以上去,也沒人知道,更遑論 第1 時間內要知道開刀房內是否有 人受困?」 (三)又詢據台大醫院消防班及駐警隊人 員表示:「我們在7 時22 分接到 電話,就立刻上去4 樓現場,不超 過2 分鐘,…上去一看,濃煙迅速 急竄,電梯間就在旁邊,我們先快 速下去背氧氣筒再上去,進行消防 的任務,大約7 時40 分,我們在 恢復室門口附近處理排煙動作。」 「我們於23 分到現場,有打119 ,告訴119 消防局火場在徐州路那 一面,我要急診室駐警到徐州路急 診門口去帶路,消防局的人已經在 那裡…大約23 分、24 分左右,黑 煙大量竄出。」然查台北市政府消 防局救災救護指揮中心(119)之 火警報案通聯紀錄顯示,第一通報 案電話係於當日7 時27 分,由台 大醫院外面看到起火之民眾報案: 「台大醫院後面這邊起火了…林森 南路這一條進來…趕快哦!醫院裏 面哦!我是外面看到的。」經民眾 陸續報案後,台大醫院卻遲至7 時 34 分及38 分始報案,且未具體提 供火場動線及人員受困之訊息。
監察院公報【第2653 期】 ‧18‧ (四)另詢據台北市政府消防局查復台大 醫院提供救災協助之說明略以:「 第一批到達現場消防人員自行進入 火場,並無人引導,且該局相關人 員並未接獲台大醫院提供鑰匙,僅 第4 大隊長吳武泰表示,其於當日 約8 時15 分左右到達現場,至急 診室詢問有無平面圖提供救災人員 作為搶救上之參考,約於8 時30 分交付1 本醫院平面圖予吳大隊長 。」又詢據現場指揮官簡任技正許 景盛指出:「我在林森南路那邊試 圖找台大醫院的負責人,但沒有聯 絡上,後來因莫大隊長已接觸台大 醫院人員,所以我留在林森南路側 指揮。我8 點多在無線電裡知道裡 面還有人受困,大約於9 點多在大 廳接觸到台大醫院指揮人員。」 (五)綜上,台大醫院消防班人員初期滅 火無效,駐警人員通報機制失靈, 未向台北市政府消防局相關人員提 供至火場動線及人員受困之訊息, 安全門上鎖且未引導消防人員至災 害現場,亦未提供平面圖及萬用鑰 匙,以有效協助消防救助,明顯與 消防防護計畫所載事項不符,均有 未當。 四、台大醫院未妥善訂立緊急及災難事件 病患疏散作業規範,緊急應變未提供 安全管制,且未有效指揮和疏散路線 引導,應予檢討改進。 (一)依據醫院緊急災害應變措施及檢查 辦法第6 條規定:「醫院應訂定緊 急災害發生時之疏散作業方式,規 劃病人、員工及醫療設備疏散之路 線、疏散地點及病人運送方式,並 保障疏散過程中,相關人員之安全 。」同辦法第11 條規定:「醫院 每年至少應舉行緊急災害應變措施 演習及桌上模擬演練各1 次,並製 作成演習紀錄、演習自評表及檢討 改善計畫,送直轄市、縣(市)主 管機關備查。」此係按醫療法第 25 條第2 項規定所訂定,並為保 障病人權益而設有災害應變及平時 防災演練之機制。 (二)查台大醫院「手術室緊急應變與疏 散作業程序書」,雖訂有手術室於 夜間或假日發生火災,必須進行緊 急疏散時,由護理主管判斷是否需 請求人力支援;且規定手術室緊急 事故發生時,以病人、家屬及工作 人員安全為主,所有工作人員均遵 從指揮人員之安排,及規範手術室 工作人員熟悉緊急應變措施訓練, 並分別針對火災或停電訂有因應計 畫。惟未載明由何人決定進行現場 緊急疏散,且指揮人員之定義不明 ,又此次火災濃煙造成搶救不及, 同時面臨斷電事宜,均非以往演練 狀況,台大醫院應切實檢討改進。 (三)又查台大醫院「緊急及災難事件病 患疏散作業」,雖明定緊急及災難 事件發生時,病患疏散作業之進行 分成4 個階段疏散,第1 階段先移 出災難地點;第2 階段「水平移動 」:移至建築物同一樓層的其它位 置,必需在防煙閘門之外;第3 階 段「垂直移動」:視指揮官的指定 移至比較低(少數是高)的樓層; 第4 階段則是移出該棟建築物。當 日該院東址院區僅手術室附近起火
監察院公報【第2653 期】 ‧19‧ ,各區域及各樓層所受濃煙產生之 影響不一,部分病房試圖打開窗戶 排煙,卻找不到窗戶鑰匙,而進行 疏散作業。據台大醫院指出,東址 54 個病房單位於次日向護理部回 報資料,有20 個單位於當時先採 取水平疏散方式進行病人及家屬疏 散,其餘34 個單位則直接以垂直 疏散方式直接疏散病人。其中仍有 病患自行離院或被家屬推至院外, 且台大醫院提供疏散統計數據前後 不符。 (四)據上,台大醫院所訂緊急及災難事 件病患疏散作業規範,對於現場緊 急疏散、斷電等權責及指揮人員之 定義不明,緊急應變疏散紊亂,亦 未提供安全管制,且未有效指揮和 疏散路線引導,應予檢討改進。 五、台北市政府消防局驟然認定台大醫院 不屬重要公共設施,草率認定台大醫 院火災僅為成災火警案,核有疏失。 (一) 依據「各級消防機關救災救護指揮 中心作業規定」第5 點第3 項第1 款第2 目規定,火災之重大災害標 準係指:「1、死亡2 人以上、4 人以下,死傷合計15 人以上、29 人以下…或財物損失達5 百萬元以 上之火災者。2、重要場所(軍、 公、教辦公廳舍或政府首長公館) 、重要公共設施發生火災者。3、 火勢燃燒達2 小時以上,損失、傷 亡一時難以估計;惟可預期災害損 失甚大者。4、具有影響社會治安 重大之火災者。…」台北市政府為 加強火災搶救及善後處理訂有「台 北市火災處置要點」,該要點第2 點第2 項對於重大火災亦類此規定。 (二) 台大醫院東址院區於97 年12 月 17 日發生火警,台北市政府消防 局救護指揮中心於晚間7 時27 分 受理報案,至9 時10 分回報火災 撲滅。詢據台北市政府消防局查復 略以:「本次台大醫院火災案,燒 損集中於起火點附近面積約80 坪 之處,造成2 人受傷,無人員因火 災造成死亡。依據內政部消防署函 頒之『消防機關辦理火災後建築物 及物品損失估算暫行基準』,財物 損失預估約30 萬元。又依各級指 揮人員回報情形及本局救護指揮中 心評估結果,不符合重大火警標準 。」 (三) 惟台大醫院位於台北市中正區,屬 教學醫院、醫學中心等級之公立醫 院,其東址院區為地上16 層地下 4 層鋼筋混凝土結構建築物,全棟 總樓地板面積為280,232 平方公尺 ,內有病床數3,213 床,且前往探 病民眾或病人多達1,500 人以上。 台大醫院此次火災延燒近2 小時, 造成病患張憲雄搶救不及而意外死 亡,並有13 名醫護人員及駐衛警 遭濃煙嗆傷,且台大醫院僅投保建 築物本體之火災保險,內部醫療儀 器未在投保範圍的情況下,初估火 險理賠總額即近4 千萬元,顯然財 物損失已逾重大火災5 百萬元之標 準。 (四)查內政部消防署為統一消防機關對 火災後之建築物及物品損失估算方 式,訂有「消防機關辦理火災後建 築物及物品損失估算暫行基準」,
監察院公報【第2653 期】 ‧20‧ 其中火災後建築物(房屋本體、裝 潢)及物品之火災損害估算基準, 應包含被燒損、水損、煙薰致使不 堪使用之財物損失;且據台大醫院 表示,此次火災所造成財物損失高 達3 億元以上。是以,台北市政府 消防局驟然認定台大醫院不屬重要 公共設施,僅估算燒損面積80 坪 範圍內建築物之損害為30 萬元, 草率認定台大醫院火災僅為成災火 警案,核有疏失。 六、台北市政府消防局接獲台大醫院火災 報案後,通報作業遲緩,且延誤通報 該局局長到場擔任總指揮官,又局長 接獲通知後並未明快處理,應予檢討。 (一) 依據「直轄市、縣(市)消防機關 火場指揮及搶救作業要點」第5 點 第1 項規定:「消防機關接獲火警 報案派遣人車出動,應同時指派適 當層級救火指揮官到場指揮…研判 災情達成災標準時,應通報大(中 )隊長到場指揮;可能達重大火災 層級時,則應通報消防局局長到場 擔任總指揮官…。」係內政部消防 署為提昇各級消防機關火場指揮能 力,強化火災搶救效率,發揮整體 消防戰力,以確保人民生命財產安 全所訂定。 (二) 又依據「各級消防機關救災救護指 揮中心作業規定」第5 點第2 項規 定略以:「遇有災害發生,應立即 陳報、通報,並嚴守不遲報、不漏 報、不匿報及不誤報之紀律。…報 告時應考量狀況大小、災害程度、 災害性質。遇重大災害時,應即時 向上級機關或首長同步報告…持續 掌握災害現場及災情,並貫徹初報 、續報、結報之作業程序。」係內 政部為統一各級消防機關救災救護 指揮中心執勤方式,並明訂指揮、 調度、管制、聯繫之作業要領。 (三)本案台北市政府消防局於晚上7 時 27 分接獲通報,於7 時35 分通知 總值日官許景盛簡任技正,7 時42 分通知指揮中心畢幼明主任,事發 33 分後始於8 時正通報熊光華局 長,導致該局局長、副局長及主任 秘書等高階人員均未到達現場。詢 據台北市政府消防局查復略以:「 消防局長與考試院伍錦霖副院長及 數位考試委員,於晚上7 時在台北 市忠孝東路5 段餐敘。局長8 時餘 接獲通知時,已準備結帳趕赴現場 ,嗣因現場已逐步獲得控制,故未 立即趕赴現場。」顯見該局對本次 火災之搶救處置欠當。又內政部消 防署當日於晚上7 時59 分、8 時 10 分、8 時18 分、8 時26 分、8 時32 分、8 時36 分等6 次向台北 市政府消防局要求將本案重大災害 報告單依規定上傳該署,台北市政 府消防局遲至8 時49 分始完成初 報上傳,而未能即時有效通報。 (四)據此,台北市政府消防局接獲台大 醫院火災報案後,通報作業遲緩, 且延誤通報該局局長到場擔任總指 揮官;又局長接獲通報後,並未瞭 解現場財物損失情況、人員疏散及 受困情形,竟擅自作主而未緊急到 場指揮搶救,亦未有戒慎意識以力 求切實,紊亂指揮體系之標準作業 程序,致招媒體對此大肆報導,影響
監察院公報【第2653 期】 ‧21‧ 消防救災人員之形象,應予檢討。 綜上所述,台大醫院火災預防不力,擅 自關閉地區火警鈴,且未落實消防安全 設備之維護管理及檢修申報,亦未能發 揮救災協助功能及有效指揮疏散;且台 北市政府消防局對於火災認定失誤,致 該局局長未即時到場指揮,均有疏失, 爰依監察法第24 條提案糾正,移送行 政院轉飭所屬確實檢討改善見復。
四、本院財政及經濟委員會為漢翔航 空工業公司未訂定有關BOT 投資 專案作業風險評估作業,可行性 及財務分析徒具形式,既定作業 規範顯有重大闕漏等違失,爰依 法糾正案 監察院 公告 發文日期:中華民國98 年5 月5 日 發文字號:(98)院台財字第0982200230 號
主旨:公告糾正漢翔航空工業公司未訂定有 關BOT 投資專案作業風險評估作業 ,可行性及財務分析徒具形式,既定 作業規範顯有重大闕漏;另於規劃統 一案階段之相關評析檔卷盡已散失, 顯見檔案存管移交之規範及執行均有 重大缺失,內部控管亟待加強;復於 統一案規劃階段,未能慎始評析計畫 可行與否,並忽視行業風險及錯估原 料價格走勢,致使董事會決策判斷錯 誤;且與統一公司簽訂之興建合約, 無法反應天然氣購價波動,合約之訂 定顯欠周延;又於統一案興建期間, 漠視天然氣價格持續高漲事實及財務 處等單位所提警訊,賡續投入興建經 費,放任損失擴大,肇致廠房設備甫 興建完成隨即協議拆除,虛擲巨額工 程經費,嚴重浪費公帑,均有違失案。 依據:依98 年4 月21 日本院財政及經濟委 員會第4 屆第22 次會議決議及監察 法施行細則第22 條規定。 公告事項:糾正案文1 份 院長 王建煊 糾正案文 壹、被糾正機關:經濟部所屬漢翔航空工業 公司。 貳、案由:漢翔航空工業公司未訂定有關 BOT 投資專案作業風險評估作業,可 行性及財務分析徒具形式,既定作業規 範顯有重大闕漏;另於規劃統一案階段 之相關評析檔卷盡已散失,顯見檔案存 管移交之規範及執行均有重大缺失,內 部控管亟待加強;復於統一案規劃階段 ,未能慎始評析計畫可行與否,並忽視 行業風險及錯估原料價格走勢,致使董 事會決策判斷錯誤;且與統一公司簽訂 之興建合約,無法反應天然氣購價波動 ,合約之訂定顯欠周延;又於統一案興 建期間,漠視天然氣價格持續高漲事實 及財務處等單位所提警訊,賡續投入興 建經費,放任損失擴大,肇致廠房設備 甫興建完成隨即協議拆除,虛擲巨額工 程經費,嚴重浪費公帑,均有違失,爰 依監察法第24 條規定提案糾正。 參、事實與理由: 漢翔航空工業公司(下稱漢翔公司)興 建統一企業公司(下稱統一公司)永康 汽電共生廠案(下稱統一案),原規劃 由統一公司無償提供廠區土地,漢翔公
監察院公報【第2653 期】 ‧22‧ 司出資新台幣(下同)3 億5 千萬元興 建汽電共生系統及廠房,並於營運15 年後無償移轉予統一公司,營運期間產 生之電能及蒸汽,統一公司應按月依使 用量攤付租賃租金及各項操作費用,雙 方並於民國(下同)89 年7 月24 日簽 訂「汽電共生系統興建、操作及移轉合 約」(下稱興建合約),該廠房設備預 定於92 年4 月完工,惟實際遲至95 年 9 月始興建完成,又因天然氣價格高漲 ,經評估已不具營運效益,甫興建完成 隨即協議拆除。漢翔公司承攬該案之評 估及執行情形,經審計部派員調查結果 ,據報核有未盡職責及效能過低情事, 已另案函請經濟部查明妥適處理,並依 審計法第69 條於97 年12 月31 日以台 審部四字第0970003521 號報請本院核 處乙案,確有下列違失: 一、漢翔公司未訂定有關BOT 投資專案 作業風險評估作業,可行性及財務分 析徒具形式,既定作業規範顯有重大 闕漏: 按國營事業固定資產投資計畫編製評 估要點第4 點規定:「專案計畫應對 投資環境、計畫之投入產出,諸如人 力、財務、土地、原物料取得、製程 及工程技術、產出市場預測等內外在 因素作周延審慎之考量;對成本效益 應作精密之評估,包括風險及不定性 分析,並顧及公害防治、環境影響及 工業安全衛生。」,同要點第6 點規 定:「凡專案計畫均應研提可行性研 究報告。」,及同要點第7 點規定: 「各事業擬議中之專案計畫均應先就 投資環境、計畫之投入產出,諸如人 力、財務、土地、原物料取得、製程 及工程技術、產出市場預測等內外在 因素作初步可行性評估,確認有投資 價值者,再編製可行性研究報告。」。 經查漢翔公司辦理統一案係依該公司 於87 年4 月7 日發布之「成本估算 及報價作業要點」規定辦理,惟上開 要點僅粗略概要規範投資案成本估算 作業流程,非但未詳加規範應行評估 分析之方法、範圍、內容及必備表報 資料,遑論最關鍵重要之風險及不定 性分析亦付諸闕如,足見該要點所稱 之可行性及財務評估分析徒具形式, 市況環境及投資營運風險根本無從控 管,對決策判斷毫無助益,亦無法掌 握各項因素變動訊息,有效評量投資 計畫繼續或停止之效益,以為應變停 損措施,相關作業規範顯有重大闕漏 。雖據復該公司近來業經修訂「成本 估算及報價作業要點」,然BOT 投 資專案之可行性、財務及風險評估之 相關作業規範,是否周妥完備,實際 運作情形是否落實執行,仍應參照國 營事業固定資產投資計畫編製評估要 點規定,詳加檢討改進修訂之。 二、漢翔公司規劃統一案階段之相關評析 檔卷盡已散失,顯見檔案存管移交之 規範及執行均有重大缺失,內部控管 亟待加強: 依據漢翔公司於88 年5 月12 日發布 之「文書管理作業要點」第2.1 點規 定:「本要點所稱文書,係指處理公 務或與公務有關之全部文書。凡公司 與機關或公司與民眾往來之公文書, 公司內部通行之文書,以及公文以外 之文書而與公務有關者,均應包括在 內。」,惟該要點對於檔案管理之範
監察院公報【第2653 期】 ‧23‧ 圍,卻限縮於僅編列於總收文、總發 文條碼者之文書,有關重要財務評估 依據、報告、簽呈資料等之存管、移 交等規定卻付諸闕如,顯示該公司檔 案管理之內部控制設計確有嚴重瑕疵 及闕漏。 又「定期保存之檔案未逾法定保存年 限或未依法定程序,不得銷毀。」、 「公務員於職務移交或離職時,應將 其職務上掌管之檔案連同辦理移交, 並應保持完整,不得隱匿、銷毀或藉 故遺失。」檔案法第12、13 條定有 明文。復依漢翔公司文書管理作業要 點(88 年版)附件13「檔案保存年 限標準表」明定,各項工程案件、各 項採購案件之保存年限為20 年;財 物各項憑證、會計案之保存年限為 15 年。另依漢翔公司於87 年4 月7 日發布之「成本估算及報價作業要點 」規定,該公司投資及研發案成本估 算作業流程依序應進行可行性分析、 定義計畫工作內容及時程、計畫工作 內容知會相關單位、…、投資/研發 案會會計處與企劃處、投資/研發案 呈核,且訂單報價金額為新台幣5 千 萬以上,須進行財務評估分析,同時 併呈財務副總。查該公司於89 年5 月底將統一案簽報董事會審查前,該 公司所進行可行性及財務評估分析之 相關資料,暨依上述成本估算作業流 程之文件表報及會簽呈核卷證等,據 該公司查復業因承辦人員(已離職) 移交存檔疏失,盡已散失,無從查考 ,亦無檔案銷燬紀錄,益見該公司檔 案移交、管理之執行鬆散不力,流於 形式,內部控管亟待加強,雖據復該 公司近來業經修訂相關文書管理作業 規定,並責成各級主管嚴格督導公文 管理及交接,惟實際列管存放之制度 設計是否完備,實際運作有無遵行制 度之設計,仍待該公司賡續檢討改進 之。 三、漢翔公司於統一案規劃階段,未能慎 始評析計畫可行與否,並忽視行業風 險及錯估原料價格走勢,致使董事會 決策判斷錯誤,確有違失: 按國營事業固定資產投資計畫編製評 估要點第1 點規定:「投資計畫之效 益分析,應以現值報酬率法及淨現值 法為主,收回年限法為輔,並作風險 與不定性分析。分析時,應揭露預測 之假設條件及資料來源。」,及同要 點第3 點規定:「投資計畫應以資金 成本為基礎,並決定一可接受之合理 報酬率,作為取捨之標準。其現值報 酬率大於資金成本率且淨現值為正者 方可投資…。」,揆諸上開規定,旨 在說明投資計畫必須執行成本效益分 析,以為投資計畫評比之依據,並應 考量相關經濟變數可能造成之影響, 藉由敏感度分析,調整成本與效益認 列之基礎,以瞭解各種不確定狀況下 ,成本效益分析結果是否改變,俾使 財務計畫至臻完善。 卷查漢翔公司前董事長蔡○○於88 年5 月28 日拜會統一集團總裁高○ ○,洽談合作永康汽電共生廠案前, 自始未進行任何相關專案可行性評估 。其後,於89 年3 月3 日統一案工 程設計規劃簡報中,僅規劃建廠預定 時程為89 年3 月至90 年9 月,卻隻 字未提可行性及財務評估分析情形。
監察院公報【第2653 期】 ‧24‧ 嗣於89 年5 月29 日該公司汽電共生 專案室簽辦統一案提送董事會審查, 方見相關資金運作與投資效益分析內 容:預估每MMBTU(約25.2 立方 公尺)之天然氣價格分別為:營運第 1 年5.14 美元、第2 年4.68 美元、 第3 至15 年均維持4.27 美元不變下 ,整廠投資金額預估約3 億零8 萬元 ,內部報酬率(IRR 未考量資金成本 )約10.16%(營運15 年移轉),第 7 年回收,全案營運15 年預計收入 24 億3,124 萬,支出21 億4,637 萬 ,淨獲利2 億8,487 萬。隨即於同年 月30 日簽會該公司會計處財務組, 會簽意見為敬悉後,同日董事會照案 通過。旋於同年7 月24 日與統一公 司簽訂汽電共生系統合約及租賃契約 。揆諸上述規劃過程自始未能審慎考 量,不僅成本效益之財務評估未盡覈 實,且對投資環境、原物料市場預測 及民眾抗爭等內外在因素資訊蒐集及 風險評析付諸闕如,率爾以粗陋之估 算即提送董事會據以決策建廠與否, 自嫌資訊不足、草率不周,致使董事 會決策重大錯誤。 攤提之損益平衡。惟漢翔公司規劃統 一案期間(88 年3 月至89 年5 月間 ),非但對於獨占市場之台灣中油公 司輸氣環線配氣管線供應合格汽電共 生系統用戶之進口天然氣牌價(下稱 天然氣牌價)由88 年5 月1 日之每 立方公尺7.05 元,7 度調升至89 年 5 月18 日每立方公尺8.34 元(詳附 表2),遽幅攀升之趨勢置若罔聞, 逕行引用(以1 美元兌換新台幣32 元之匯率換算)天然氣每立方公尺價 格分別為:營運第1 年6.53 元、第2 年5.94 元、第3 至15 年5.42 元等不 實數據估算投資效益,顯為量身裁衣 ,殊不察自71 年以來國內天然氣牌 價從未低於6.6 元(詳附表1);復 無視國際天然氣價格持續高漲之趨勢 及事實,任憑業務經辦個人臆測天然 氣價格上揚係屬短期之波動,亦屬無 據,違失情節重大。 據此,漢翔公司於統一案規劃階段, 未能慎始評析計畫可行與否及行業風 險,更無視天然氣價格持續高漲之事 實,引用偏離國內牌價甚多之不實數 據,顯為量身裁衣,復任憑業務經辦 個人臆測,錯估原料價格走勢,提供 粗糙不實且有欠完整之評估分析資料 ,致使董事會決策判斷錯誤,實有重 大違失。 四、漢翔公司與統一公司簽訂之興建合約 ,無法反應天然氣購價波動,合約之 訂定顯欠周延,殊有怠失: 依漢翔公司於87 年4 月7 日發布之 「成本估算及報價作業要點」第20 條規定,「報價案之成本估算應考量 每項產品所需材料之市場行情、競爭 情況及本公司產能情況,並應依據預 估採購與交貨期程,將物價及匯率等 因素列為估算重要參數。」查漢翔公 司於89 年7 月24 日簽訂統一案興建 合約時,天然氣牌價已達8.62 元, 詎該公司仍依該案興建合約第6 條及 第7 條,蒸氣售價以行政院主計處公 布之消費者物價指數102.78 及向台 灣中油公司購買天然氣成本每立方公 尺8.05 元為基準計算並調整,電力 售價卻依台電公司二段式時間電價之
監察院公報【第2653 期】 ‧25‧ 96.5%計費調整;然而該合約所訂天 然氣牌價既已背離當時市場行情,再 加之電力售價無法涵蓋天然氣購價成 本波動之影響,致無法規避主要原料 天然氣價格變動之風險。 雖據漢翔公司答辯略以,上開合約定 價模式,係參考台灣汽電(股)公司 於統一公司楊梅廠所興建之汽電共生 廠案而訂定,惟查台灣汽電(股)公 司於統一公司楊梅汽電共生廠係以燃 料油為原料,其成本遠較以天然氣為 原料低廉,顯示漢翔公司初跨足汽電 共生業,卻未詳加調查行業成本結構 差異及可能之投資營運風險,率爾比 照同業訂價模式簽訂合約,致電力售 價無法涵蓋天然氣購價成本波動,造 成嗣後之重大虧損,合約之訂定顯欠 周延,殊有怠失。 五、漢翔公司於統一案興建期間,漠視天 然氣價格持續高漲事實及財務處等單 位所提警訊,賡續投入興建經費,放 任損失擴大,肇致廠房設備甫興建完 成隨即協議拆除,虛擲巨額工程經費 ,嚴重浪費公帑,違失事實至為灼然: 按國營事業固定資產投資計畫編製評 估要點第20 點規定:「投資計畫進 行中,應就各項因素變動情形,續作 計畫繼續或停止進行之效益分析。」 查漢翔公司統一案簽約後,於興建階 段初期,疏於掌握市場脈動,賡續檢 討評估計畫繼續或停止進行之效益分 析,迨天然氣管線舖設工程因地方抗 爭及路權爭議等問題,進度延宕,始 於92 年11 月間研議變更管線舖設路 線及討論該案應否續建。惟天然氣價 格節節調漲(詳附表2),中油公司 天然氣牌價已自89 年7 月簽約時每 立方公尺8.62 元上升至9.83 元。案 經該公司財務處及會計處依經理部門 提供資料重新評估,提出「該案考慮 建廠成本後,概估淨損失約3 億元, 未來營運期間天然氣價格若持續調漲 ,損失將再擴大」之意見,惟經理部 門以國內天然氣價格高於國際市場價 格,未來將調整趨於合理價位,且如 立即停建,將發生重大損失等由,於 92 年12 月間簽奉副董事長核可仍繼 續興建。 嗣於93 年7 月9 日再次召開管線埋 設變更路線評估會議時,中油公司天 然氣牌價更自92 年11 月每立方公尺 9.83 元上升至10.58 元,經該公司估 算該案興建完成後每年損失至少2 千 2 百餘萬元(若不考慮折舊費用每年 損失約1 百餘萬元),經理部門已知 該案興建完成將立即面臨營運虧損, 且財務處亦提出「該案營運總收入無 法大於變動成本,應考量是否仍繼續 再投入經費執行管線埋設變更路線方 案」之意見,惟經理部門仍以撤案拆 廠將喪失工程實績,且欲終止合約恐 牽涉冗長訴訟程序為由,主張繼續興 建,並以該管線埋設變更路線方案已 奉核定,賡續投入3 千7 百餘萬元辦 理管線埋設變更工程。 復因該案天然氣管線舖設工程,辦理 路線變更,延至94 年2 月完工,連 帶使發電機組、蒸汽系統等設施無法 順利施工,且94 年4 月間進行試車 發現鍋爐設計不良,衍生履約爭議, 該汽電廠遲至95 年9 月始興建完成 ,較預計完工期程(92 年4 月)落
監察院公報【第2653 期】 ‧26‧ 後近3 年5 個月。不料該廠甫興建完 成,該公司旋因天然氣價格高漲,評 估不具營運效益,於同年12 月19 日 與統一公司召開該廠營運困難之善後 會議,雙方同意協議終止合約,嗣於 96 年5 月簽署合約終止協議書,依 協議統一公司保留汽電廠建築與部分 設備,並由漢翔公司另支付統一公司 土地租金等補償費用1 百餘萬元。又 漢翔公司於96 年12 月再斥資2 百餘 萬元費用,拆除該廠相關設備,並於 97 年3、4 月間出售拆回之設備,僅 回收價金計9 千8 百餘萬元,綜計虛 擲公帑3 億4 千3 百餘萬元。 綜上,漢翔公司於統一案興建期間長 期粉飾太平,漠視天然氣價格持續高 漲之事實及財務處等單位所提「天然 氣價格若持續調漲,損失將再擴大」 、「該案營運總收入無法大於變動成 本」等之警訊,仍堅持依原規劃及已 核定之計畫作業,非但無法及時提出 有效對策,貽誤停損時機,復賡續於 93 至96 年度間投入興建經費1 億3 千餘萬元,放任損失擴大;該案綜計 虛擲經費3 億4 千3 百餘萬元,嚴重 浪費公帑,違失事實至為灼然。 綜上所述,漢翔航空工業公司未訂定有 關BOT 投資專案作業風險評估作業, 可行性及財務分析徒具形式,既定作業 規範顯有重大闕漏;另於規劃統一案階 段之相關評析檔卷盡已散失,顯見檔案 存管移交之規範及執行均有重大缺失, 內部控管亟待加強;復於統一案規劃階 段,未能慎始評析計畫可行與否,並忽 視行業風險及錯估原料價格走勢,致使 董事會決策判斷錯誤;且與統一公司簽 訂之興建合約,無法反應天然氣購價波 動,合約之訂定顯欠周延;又於統一案 興建期間,漠視天然氣價格持續高漲事 實及財務處等單位所提警訊,賡續投入 興建經費,放任損失擴大,肇致廠房設 備甫興建完成隨即協議拆除,虛擲巨額 工程經費,嚴重浪費公帑,均有違失, 爰依監察法第24 條提案糾正,移送行 政院轉飭經濟部暨所屬漢翔航空工業公 司確實檢討改善見復。(附表略)
***************** 糾正案復文 ***************** 一、行政院函復,本院前糾正政府未 能有效整合公、私立就業服務機 構體系,造成就業輔導業務事權 不一,致就業服務績效不彰;職 業訓練欠缺完整體系及評鑑機制 ,影響訓練成效等違失案查處情 形(糾正案文見本院公報第2382 期) 行政院 函 發文日期:中華民國91 年11 月4 日 發文字號:院臺勞字第0910049919 號
主旨:貴院函,為政府未能有效整合公、私 立就業服務機構體系,造成就業輔導 業務事權不一,致就業服務績效不彰 ,且職業訓練欠缺完整體系及評鑑機 制,影響訓練成效。又勞工保險失業 給付,尚乏詳細之評估與調整,導致 預估與實際核付金額落差甚鉅及臨時 工作津貼、創業貸款利息補貼、僱用
監察院公報【第2653 期】 ‧27‧ 獎助津貼之核發,成效不彰,資遣通 報制度未能落實執行,均有未當。爰 依法提案糾正,囑轉飭所屬切實檢討 改進見復一案,經轉據本院勞委會會 商本院青輔會函報之檢討改進情形, 並經酌整,尚屬實情,復請 查照。 說明: 一、復 貴院九十一年八月十二日(九一) 院台財字第○九一二二○○六○○號 函。 二、檢附本院勞委會會商本院青輔會對本 案之檢討改進情形一份。 院長 游錫堃 本院勞委會會商本院青輔會對本案之檢討改 進情形 壹、我國就業輔導業務事權不統一,就業服 務機構未能有效整合公、私立就業服務 機構體系,且人力及專業性不足,致就 業服務績效不彰,顯有未當。 勞委會部分: 一、有關我國就業輔導業務事權未能統一 一節: (一)目前我國就業輔導業務事權除勞委 會職掌外,另為因應不同對象而分 屬青輔會、退輔會、農委會、法務 部、台北市政府、高雄市政府與其 他縣(市)政府等機關依其法定職 掌辦理就業輔導業務。另目前我國 公立就業服務機構設置係依據「就 業服務法」第六條規定,勞委會為 中央主管機關,直轄市政府與縣( 市)政府為地方主管機關,並依同 法第十二條規定得視業務需要,設 置公立就業服務機構。準此,除勞 委會承接原省政府所屬五個就業服 務中心二十五個就業服務站外,台 北市政府與高雄市政府亦依法各設 置就業服務中心與就業服務站。 (二)主管機關核發私立就業服務機構設 立許可證時,均須依據「私立就業 服務機構許可及管理辦法」規定, 審核其所聘僱員工中是否有依法聘 僱就業服務專業人員,如未依規定 聘僱,則未予以核准;另勞委會為 有效管理私立就業服務機構,亦針 對其執行業務概況進行評鑑,及為 提昇私立就業服務機構就業服務人 員專業能力,每年依業務需要辦理 各項業務研習,如九十一年度規劃 分北中南三區辦理「私立就業服務 機構就業服務工作人員專業訓練」 ,以提昇就業服務人員專業能力素 質。 (三)改進措施:
- 有關就業輔導業務事權不統一部
分,「行政院組織法」修正草案 中,已針對此一部分予以檢討改 進。
- 另勞委會正依「就業服務法」規
定正研修「公立就業服務機構設 置準則」,據以明確規範中央與 地方公立就業服務機構之職掌與 權責。
- 目前公立就業服務中心針對就業
諮商、就業促進研習等就業專業 服務委外辦理,同時將規劃由民 間參與就業推介媒合,以期提高 誘因,提昇私立就業服務機構之 專業。 二、有關九十年我國公立就業機構媒合率 僅百分之零點四二,且未能有效整合
監察院公報【第2653 期】 ‧28‧ 公私立就業服務機構體系,以提高就 業媒合服務之效率一節: (一) 就業市場中,雇主之求才就業機會 刊登、招募方式與管道非常多元, 除報章雜誌與親友師長介紹外,公 私立就業服務機構與網際網路登錄 媒合方式亦是常見之管道,而公立 就業服務機構與前開眾多管道不同 之處,即是其所掌握之就業機會是 經過事先確認與查詢,比較具有公 信力與安全性,也因而在時效性上 ,較其他管道稍慢,但是其對身心 障礙者等特定對象之就業服務係一 般民間與其他管道所無法提供的, 因此其利用率不高與其他國家均大 同小異。 (二) 依據勞委會職訓局統計速報顯示: 九十年公立就業服務機構計受理求 職四三九、四八九人,求才四○五 、六三七人,推介就業一二八、二 ○五人,求供倍數○.九二,求職 就業(媒合)率二九.一七%,求 才利用率三一.六一%。 (三)改進措施: 為配合「就業保險法」之施行,勞 委會積極辦理就業服務、職業訓練 及失業給付三合一業務,建制接待 區、綜合服務區、就業資訊區、雇 主服務區、諮詢服務區等五大功能 區,並結合民間資源,強化公立就 業服務中心就業諮詢服務功能與建 立專業化之就業諮詢網絡及加強雇 主服務,爭取就業機會,以加強辦 理一般求職者、特定對象及請領失 業給付就業諮詢與就業促進、媒合 工作,提升職場供需媒合績效。 三、有關公立就業服務機構人力及專業性 不足,未能切合實際需要一節: (一)依據勞委會九十一年六月份統計調 查目前職業訓練局所屬五區就業服 務中心,具有就業諮詢專業能力者 及相關工作經驗者為一○八人,包 含主管二十八人、正式職員三十一 人、非正式人員四十九人,其學經 歷簡述如下: 1.畢業於國內外大學勞工、心理、 輔導、教育心理、應用心理及社 會工作、社會學等相關系所者: 主管十七人、正式職員十六人、 非正式人員三十人。 2.畢業於國內外大學非前述相關系 所,但曾修習相關課程,並有國 內就業促進工作實務經驗一年以 上者;或參與專業諮商機關辦理 相關訓練達二百小時以上,並有 國內就業促進工作實務經驗一年 以上者:主管二人、正式職員四 人、非正式人員七人。 3.畢業於國內外大專,曾於公立就 業服務機構或已立案之私立就業 服務機構從事就業推介、就業諮 詢相關工作至少三年以上者:主 管九人、正式職員十一人、非正 式人員十二人。 (二)改進措施: 為配合「就業保險法」之施行,辦 理就業服務、職業訓練及失業給付 三合一業務,強化公立就業服務中 心就業諮詢服務功能及建立專業化 之就業諮詢網絡,加強辦理一般求 職者、特定對象及請領失業給付者 就業諮詢,促進職場供需媒合。目
監察院公報【第2653 期】 ‧29‧ 前各公立就業服務中心就業諮詢服 務主要項目如下: 1.簡易諮詢: 當求職者前來公立就業服務中心 ,首先經由綜合服務區第一線櫃 檯進行簡易諮詢,依求職者工作 能力、就業意願、過去之工作經 驗、就業需求、經濟壓力及所面 臨之助力與阻力、安排提供深度 就業諮詢服務、或推介就業、或 轉介職業訓練、社政及衛生等單 位。 2.個案管理: 當求職者前來公立就業服務中心 ,經由簡易諮詢後,認為求職者 有就業技能不足、謀職能力不足 、就業適應困難、長年失業,推 介多次不成功等或就業適應困難 等情形,認為須由專人提供服務 者,將會進入綜合服務區第二線 ,由個案管理員提供一對一之專 人個案管理服務,由個案管理員 進行評估及轉介。 (1)個案管理服務是提供給那些正 處於多重問題且需要多種協助 者同時介入的案主(求職者) 之協助過程。個案管理除了增 進案主使用資源的知識、技巧 及態度,更著重在強化案主個 人取得資源及運用資源網絡之 能力。個案管理服務係經由個 案管理員運用分類服務檢視表 ,進行評估及開立處理意見, 視求職者之狀況,轉介職訓諮 詢、就業促進研習活動或深度 就業諮詢,並負責追蹤輔導結 案,或是由個案管理員直接推 介就業。 (2)個案管理員不僅須瞭解案主需 求,最重要的是對於目前政府 之就業安置計畫及各項措施有 所了解,例如:職業訓練(公 共職業訓練、委託民間短期職 訓、職訓券等)、創業輔導( 創業貸款利息補貼)、短期就 業(多元就業開發方案、臨時 工作津貼等)、生涯轉銜(社 會救助、精神醫療等),方能 整合資源,並有效運用資源, 以提供求職者最適切之服務。 此外,個案管理員可轉介案主 參加政府委託民間團體辦理之 深度就業諮詢或就業促進研習 活動,並負責案主之後續追蹤 輔導。 3.提供深度就業諮詢及就業促進研 習活動: 除現行之就業諮詢服務外,因就 業諮詢服務人力不足,並考量就 業服務中心服務工作量,目前各 就業服務中心於九十一年七月份 試辦,並結合民間團體提供「深 度就業諮詢」及「就業促進研習 活動」,以協助求職者儘速再就 業及穩定就業。 經由個案管理轉介之個案,進入 諮詢服務區,提供深度就業諮詢 及就業促進研習活動,落實專業 化就業諮詢服務,使其加強就業 技能、增進謀職能力或協助就業 適應,並據以推介就業。 (1)深度就業諮詢:針對就業適應
監察院公報【第2653 期】 ‧30‧ 困難之求職者,提供專業化之 就業諮詢,強化求職者之就業 知能(認識職業世界、建立正 確職業觀念、加強職業適應能 力)。 (2)就業促進研習活動:針對欠缺 求職技巧之求職者,加強求職 者動機及增進其尋職技巧,提 供相關主題(如撰寫履歷表、 電話求職或面談技巧、口語表 達能力、穿著禮儀等)之講座 、實際尋職演練活動、進行一 對一個案討論或團體工作模式 等多元之個別化之服務。 四、有關公立就業服務行政作業程序緩慢 ,未能發揮服務效能一節: (一)目前各公立就業服務機構針對求才 廠商提供資料,均經過一定程序之 審查,確認工作安全性後,將相關 資料於網際網路資訊系統,以及就 業服務據點提供求職民眾查詢,內 容包括求才職稱、廠商聯絡電話、 地址、求才期間、支薪方式、學歷 要求、工作地點、工作內容簡介、 工作時間、薪資範圍、年齡要求等 ,求職者可透過網站或書面資料自 行前往該求才廠商洽談求職事宜, 除非求職者有進一步需要公立就業 服務機構協助推介,或經過公立就 業服務機構簡易諮詢,認為求職者 求職技巧不足,需協助聯繫求才廠 商者,才會由公立就業服務機構人 員以推介卡、或電話聯繫方式協助 求職,並非所有求職者均需透過此 項程序。 (二)改進措施: 1.目前勞委會職訓局已完成網際網 路就業資訊系統之招標作業,即 以現行就業服務網站,再行強化 功能,並委由民間經營管理,預 計明(九十二)年一月即建置完 成,開始啟用。未來將可達到就 業資訊更公開化、透明化功能, 同時求職求才者均可利用網際網 路達到線上即時資訊取得及線上 媒合效果。 2.運用上開資訊系統,將可協助高 度就業能力者自行就業,以避免 摩擦性失業,同時公立就業服務 機構可將人力運用於個別化、專 業化服務。 青輔會部分: 一、中央政府就業服務體系,雖以服務對 象區分由勞委會、退輔會及青輔會辦 理,但各機關本於職掌分工推動就業 服務工作,並透過研習、觀摩與會議 經常保持聯繫互動,並提供單一窗口 服務,儘可能滿足民眾之需求。機關 間亦經常共同舉辦活動,如國軍屆退 官兵就業服務活動,即由前述三會與 國防部共同辦理。每年舉辦大部隊營 區徵才活動與小部隊就業座談會,九 十年舉辦八場大部隊營區徵才及三場 小部隊座談會,參加官兵計二三、七 五五人,九十一年舉辦八場大部隊營 區徵才及四場小部隊座談會,參加官 兵計二二、○一一人。 二、青輔會僅在台北市忠孝東路一段○○ ○號一樓設置「青年求才求職服務中 心」,作為提供就業服務及技能培訓 、生涯規劃相關資訊之單一窗口,除 與各大專院校就業輔導單位密切聯繫
監察院公報【第2653 期】 ‧31‧ 外,並無其他分支機構,亦未與勞委 會所屬就業服務中心重疊。青輔會早 在八十年即開始利用電腦網路提供就 業資訊服務,並以大專以上畢業生為 主要輔導對象。九十年全年提供高中 職以上就業機會八一、三七九個、登 記求職三二、○一六人、輔導一九、 五五七人就業。九十一年(一月至八 月)提供高中職以上就業機會五八、 四○二個、登記求職一八、七一四人 、輔導一二、六二七人就業。其中有 百分之九十六的求職者、百分之五十 七廠商求才機會係透過網路線上登錄 。青輔會擬將求才求職網路服務整併 至勞委會之新系統運作,惟在未整併 前仍將持續提昇現行網路服務系統之 品質。有關該會就業服務之具體措施 為: (一)求職服務: 1.凡具有中華民國國籍的青年有求 職需要時,都可以直接上青輔會 網站作線上登錄,也可以攜帶畢 業證書影本一張,前來服務中心 辦理求職登記,不便上網或遠地 者亦可採郵寄方式辦理。 2.青年求職最快速的方法,是直接 上網查詢該會提供的就業機會, 並逕行前往應徵。該會亦將其登 記資料鍵入求職者資料庫,列印 名冊推荐給求才單位參考延攬, 並且寄送「求才週刊」四期給不 便上網者。 3.求職者如於登記時留下e-mail 信箱,該會將以電子郵件寄送最 新工作機會。 (二)求才服務: 1.凡經主管機關依法核准設立之公 私立機構或廠商,都可以攜帶政 府核准設立的證明文件影本向青 輔會辦理求才登記。求才登記, 也可以傳真或郵寄方式辦理。 2.對於求才登記資料,將鍵入資料 庫列印公告,刊登於每週四出刊 的「求才週刊」,以及上網公告 等方式廣泛流傳,供求職青年查 詢應徵。而且提供求職青年名冊 供其參考延攬。 3.經過驗證的求才單位,可以該會 提供的密碼與統一編號,直接上 網刊登求才資訊或查詢人才資料 庫。 (三)就業資訊之流通: 1.青輔會係最早設立之人力資源網 站,作為資訊流通的最佳平台, 凡所蒐集求職、求才資料後,會 立即透過網際網路供各界做線上 查詢。 2.該會協調各大專院校網站設置連 結至該會,並開放求才求職線上 登錄,求職青年不必往返本會即 可獲得完整服務。而求才廠商也 可以將求才資料直接做線上登錄 ,以供求職青年查詢應徵。 3.網路雖為最便利之資訊流通管道 ,但青年未必均能具備便利之網 路設備,因此該會每週編印求才 週刊,寄贈各大專院校、圖書館 、公立就業服務與職訓單位,提 供民眾查閱參考。並將適合身心 障礙青年之就業機會集中列印在 求才週刊中,以方便其應徵。 (四)舉辦求職求才媒合活動:
監察院公報【第2653 期】 ‧32‧ 1.為了協助青年在畢業後能迅速謀 職就業,青輔會補助各大專校院 在每年三到五月間舉辦校園徵才 與就業相關活動。 2.每年五月間該會與相關部會合作 辦理屆退官兵在營求才活動。 3.每年舉辦分區大型就業博覽會與 小型就業服務活動,供求職青年 與求才廠商直接洽談媒合,獲取 就業機會。 (五)加強生涯規劃及技能培訓: 1.生涯輔導: (1)辦理系列職場生涯發展與規劃 講座,邀請學者專家以如何作 好生涯規劃、行職業介紹、產 業趨勢及職場適應等為主題, 透過講演及座談方式,強化青 年生涯規劃觀念,以提昇就業 適應及生涯轉換能力。(九十 年全年共辦理五十場) (2)全國一五六所大專校院分成十 組,每組設資源中心學校,規 劃整合各大專校院資源辦理各 項生涯輔導活動(如講座、工 作坊、心理測驗施測與分析等 ),協助學生作好求職準備。 (3)結合民間團體(約二十五個團 體)推動各項生涯輔導工作, 擴大補助民間團體辦理相關活 動,以加強一般青年、婦女、 身心障礙青年生涯規劃能力。 (4)青輔會設有「生涯資訊中心」 ,加強蒐集生涯輔導相關之圖 書論著、雜誌期刊、剪報、求 才求職訊息、大專院校及企業 廠商簡介、就業考試、各種教 育及職業訓練資料、行職業工 作內容與就業市場現況及發展 趨勢等資訊,提供青年索閱( 自九十年元月至九十一年八月 計約一一,一○○人次)。 (5)設有電腦查詢設施,同時提供 個案諮詢服務:中心聘請專業 輔導老師提供諮詢服務(九十 年元月至九十一年四月約八百 人次),舉凡青年在職業生涯 上的問題,均可向本中心之輔 導老師請求協助,協助青年解 決困難。 (6)建立青輔會生涯輔導專屬網頁 及編撰「生涯諮商Q&A」, 運用電腦網路快速便捷之新科 技,規劃建立該會生涯輔導專 屬網頁,提供生涯輔導之相關 資訊;另編撰「生涯諮商 Q&A」,針對不同屬性青年可 能遭遇之生涯困境,提出解決 方式,供青年朋友參考。 (7)提昇輔導人員生涯輔導知能: 舉辦相關研習(討)會,工作 坊等活動,以提高輔導功效, 參加對象包括各大專校院就業 及學生輔導工作人員、社會輔 導機構人員等,同時規劃生涯 輔導工作人員基礎至進階之訓 練課程,循序增進輔導人員專 業能力。 2.技能培訓: (1)辦理碩士以上人才短期專業培 訓,結訓後輔導就業。九十年 度招訓四一九人,九十一年度 招訓九十九人,目前正受訓中。
監察院公報【第2653 期】 ‧33‧ (2)辦理大專畢業青年第二專長培 訓,結訓後輔導就業。九十年 度招訓一、四二一人,並與勞 委會職訓局合作辦理資訊軟體 人才培訓,共訓練二、八四四 人。九十一年由該會自行辦理 資訊軟體人才培訓,招訓四四 九人,目前正受訓中。 (3)辦理大專院校在校生第二專長 培訓,提前做好就業能力建構 。九十一年七月至九月委託十 二所大專院校辦理二十班,共 訓練七四一人。 (4)辦理大專院校在校生暑期工讀 媒合服務,提供職場體驗機會 ,媒合成功一一八人。 (5)與非營利組織合作辦理職業訓 練,結訓後輔導就業。九十年 度與三十個單位合作,共訓練 二、二一八人,九十一年度迄 今與十二個單位合併,共訓練 五五九人。 (6)該會「企業管理人才訓練班」 辦理大專畢業青年第二專長訓 練,訓練職類為企管、國貿、 英文秘書或其他符合就業市場 需求之職類,並予輔導就業。 九十年至九十一年八月,計辦 理十二個班次,共招訓四八○ 人,結訓四一六人,就業三四 二人。 (7)該會青年職業訓練中心,辦理 工程技術養成訓練,結訓後輔 導就業。 (六)有關配合措施:青輔會為執行行政 院災後重建計畫,辦理重建區大專 青年工讀服務,九十年寒假招募八 七九人,分發至三十四個團體;暑 假增加到一、○七八人,分發至四 十九個團體,九十一年暑假賡續舉 辦,共四九二人參加,分發到四十 五個團體。本活動除支付重建區大 專工讀青年每月一萬六千元薪資、 保險費給予實質幫助外,工讀人力 並分發當地團體對受災戶給予必要 的協助。 (七)青輔會除繼續執行現有業務外,另 將配合政府再造之整體考量,逐步 移轉業務至相關部會,並檢討停止 若干業務,以最精簡的人力提供最 完善的服務品質。 貳、我國職業訓練欠缺完整體系及評鑑機制 ,且施訓對象與訓練職種未能結合,致 無法符合就業市場需要,影響訓練成效。 一、我國訓練機構欠缺完整體系,造成資 源重疊浪費致效能不彰。 二、職業訓練機構未能因應失業者之訓練 需求,造成職業訓練與政策之失調現 象。 三、各公共職業訓練機構未能因應實需提 供相關訓練課程,無法符合就業市場 之需要。 四、訓練師資專長及現有員額不足、訓練 對象與訓練職類未能結合,影響訓練 成效。 五、承辦訓練機構缺乏評鑑機制,無法確 保訓用合一。 勞委會部分: 目前台灣地區共有十三所公共職訓 機構,包括勞委會職訓局所屬六所職業 訓練中心(泰山、北區、中區、南區、 桃園、台南)、北、高二市訓練中心、
監察院公報【第2653 期】 ‧34‧ 青輔會青年職業訓練中心、退輔會職業 訓練中心、農委會漁業署遠洋漁業開發 中心、財團法人中華文化社會福利事業 基金會附設職業訓練中心及補助財團法 人東區職業訓練中心等,每年度辦理職 前訓練約九、○○○人、進修訓練約一 二、○○○人。由於科技革新,產業轉 型及勞動力結構變遷,國人對職業訓練 的需求增加,職業訓練亦更多元化,因 此近年來除了公共職訓機構辦理職訓外 ,亦結合社會資源委託大專院校、民間 辦理各項訓練。 勞委會為重建職訓體系,已將所屬 職業訓練中心角色調整為「區域職業訓 練協調中心」,扮演訓練資源之規劃者 、整合協調者之角色,除配合就業市場 需求調整訓練職類外,另以合辦、委辦 等方式提供多元職業訓練之參訓管道, 以因應就業市場之需求,並辦理就業市 場供需調查及資訊蒐集,建立政府及民 間職業訓練資源網,辦理職業訓練績效 評鑑工作等,有關業務執行之原則及方 向說明如下: 一、公共職訓中心功能與角色之轉型與重 新定位 將勞委會職訓局所屬六個職業訓練中 心從單純的職業訓練提供者,轉換為 高效能的區域職業訓練協調中心,業 務內容為: (一)調整角色功能:因應知識經濟的發 展趨勢,並擴大民間職業訓練產業 的參與,調整職訓局所屬職業訓練 中心成為「小而能」的區域職業訓 練協調中心,扮演資源整合者、規 劃購買者、績效評鑑者及諮詢推介 者之角色。 (二)調整訓練職類:職業訓練以委託民 間機構辦理為主,職訓局所屬職業 訓練中心逐年調整職類,其調整原 則如下: 1.調減職類: (1)招生或就業情形不佳,且非區 域產業所需者。 (2)訓練設備已不符就業市場需求 者。 (3)區域內已有其他單位能充分供 給相同職業訓練者。 九十一年度已調減三十三個職類 ,約佔現有職類的二五.七%, 九十二年度預訂將再調減約二○ %的職類。 2.調整職類:職業訓練中心現有訓 練職類,仍具就業市場需求,且 為民間不願投資辦理或尚不能普 遍供給,並可在不需大量投資設 備下,提昇訓練層次者,九十一 年度計調整十一個職類。 3.新增職類:針對就業市場需要, 但職業訓練尚未辦理或訓練資源 尚不足夠者,應規劃新增,惟其 應以扶植民間訓練產業及委外辦 理為原則,九十一年度計新增三 十個職類。 二、統合職業訓練資源重建職訓體系 未來職業訓練的供應,將結合公、私 部門的資源,因此需統合其相關資源 ,以提供民眾更便捷及可信賴的職業 訓練資訊,其業務重點為: (一)辦理就業市場需求之評估 各公共職業訓練中心進行轄區就業 市場之評估,如根據縣(市)政府 建設局(科)之廠商資料,進行問
監察院公報【第2653 期】 ‧35‧ 卷、電訪及親訪事宜,並輔以人力 銀行、就業服務中心之徵才資料等 ,瞭解企業用人需求。 (二)建立全國動態職業訓練網絡 各公共職業訓練中心扮演區域訓練 資源整合者之角色,積極進行轄區 內訓練資源之蒐集、分析、建置等 工作,主動與轄區內訓練機構人員 聯繫,建立良好互動關係,協調轄 區內公私部門之訓練單位,與勞委 會職訓局職業訓練資源網連結,將 其招生開班之資訊,主動即時登錄 該局「全國職業訓練資源網」資訊 系統,以期有效掌握及運用轄區內 訓練資源。 (三)辦理職業訓練績效評鑑,提升訓練 品質 建構職業訓練評鑑制度,評鑑各職 業訓練單位之訓練績效,供民眾瞭 解各機構辦訓成效及已結訓學員之 就業狀況等,強化職業訓練內涵, 以確保提供優質之訓練品質,提高 勞工專業技能。 三、結合民間訓練資源提供多元彈性的職 業訓練 (一)培育高級人力,辦理資訊軟體及新 興產業科技人才訓練,預定辦理一 一、○○○人(就業率達五五%) ,訓練時間三○○-六○○小時。 (二)辦理初級人力相關職業訓練 1.結合事業單位辦理失業者「訓用 合一」職前訓練,預定辦理一二 、○○○人(就業率達九五%) ,訓練時間四五○小時以內。 2.補助地方政府辦理失業者及原住 民、婦女、中高齡者及符合當地 產業發展之社區化職業訓練,預 定辦理七、○○○人(就業率達 四五%),訓練時間四五○小時 以內。 3.實施失業者及特定對象職業訓練 券,補助其參加民間訓練單位辦 理職業訓練之費用,預定核發一 、○○○人(就業率達四五%) ,無訓練時間限制,補助金額每 月不超過一○、○○○元。 4.辦理非自願性失業勞工電腦學習 能力提昇研習,以減少就業能力 薄弱者之數位落差,預定辦理一 ○、○○○人,訓練時間三十六 小時以內。 5.職業訓練中心辦理失業者職前訓 練,預定辦理一○、二六○人( 就業率達六十%),訓練時間四 五○-一、八○○小時。 四、改進措施: (一)九十一年度已著手蒐集就業市場需 求調查及分析人力供給需求,作為 職類調整與開辦訓練課程之參考。 (二)九十一年度為因應環境變遷,有效 運用社會資源,同時開發民間職業 訓練資源,增加民間職業訓練力量 與容量,已訂定「職業訓練績效評 鑑工作計畫」,並自九十一年八月 起陸續辦理評鑑工作,透過職業訓 練評鑑制度,評定訓練單位之辦理 績效,作為未來是否合辦、委辦及 推介民眾參訓之依據。提昇政府與 民間之職業訓練品質,確保優質的 訓練成果,提供勞工更多元化職業 訓練之選擇,以提昇就業技能。 青輔會部分:
監察院公報【第2653 期】 ‧36‧ 青輔會青年職業訓練中心目前辦理 養成訓練計有電腦輔助機械製造、視訊 工程、電腦輔助電機控制、電腦輔助機 械製圖、電腦程式設計、電腦資訊工程 、電腦網路工程、電腦輔助電機控制進 階、電腦輔助機械製造進階及半導體配 管工程進階等十個職類,九十年度計有 四十五個班次、訓練九八七人,達成率 為一○九.六%,接受委託或合作訓練 六二七人,達成率一五六.七%。每年 分三次招生,招生前皆檢討並修訂授課 內容,九十一年度編列四百二十餘萬元 添購或汰換訓練機具設備,以配合產業 轉型與升級需求。至於擔任第一線指導 的訓練師,其素質之良窳,是訓練成功 與否之關鍵,九十二年度中心編制訓練 師三十人,目前現有訓練師三十人,具 有甲級技術士證照者達三分之一強,其 中具碩士學歷有六人,其餘皆大專以上 程度,師資陣容尚稱堅強。 參、職業訓練券之核發法源不足,且勞委會 未訂定合理補助方式及建立監督及評鑑 制度,致不切合實際需要,績效不彰。 一、職業訓練券之施行僅以試辦要點予以 規範,法源依據不足。 二、勞委會未建立職業訓練券之監督機制 ,又依其規定須以全日制施訓始予補 助,不符實際需要。 三、勞委會欠缺對於實施訓練券之評鑑制 度,致未能充分發揮訓練券功效。 四、勞委會未訂定職業訓練券之合理補助 方式,致各職業訓練機構收費標準不 一,宜予檢討。 勞委會部份: 一、查「非自願性失業勞工及特定對象職 業訓練券試辦要點」,係依「就業服 務法」第二十四條規定訂定,以促進 特定對象就業為目標之職業訓練措施 ;並考量民間職訓總體市場條件未臻 成熟,全面以訓練券方式實施訓練, 各種市場變項因素尚未能完全掌握, 爰先以「非自願性失業勞工及特定對 象職業訓練券試辦要點」採試辦方式 ,累積執行經驗,並依試辦之實際情 形漸進調整職訓券措施,直至相關影 響因子均能有效穩定控管後,再行法 制檢討。 二、職訓券現行評鑑措施,依勞委會職訓 局九十一年訂定職業訓練績效評鑑工 作計畫,已將職業訓練券訓練單位納 入評鑑範圍,針對訓練單位除查核訓 練流程外並已規劃辦理相關績效之評 鑑,經評鑑不佳者,將不予推介持券 人員參訓。 三、勞委會職訓局所屬各就業服務中心除 受理職訓券之申請及資格審查外,並 不定期派員前往職訓券持券學員參訓 之訓練單位進行查訪,如有上課不符 規定之情形,除不予補助訓練費用外 ,並停止接受該單位為職訓券訓練單 位。另於本(九十一)年二月間函請 台北市就業服務中心、高雄市訓練就 業中心及職訓局所屬就業服務中心, 確實依該要點之規定,不定期派員查 訪職業訓練券持券學員參訓之相關訓 練單位辦訓情形,俾確保訓練品質及 使政府資源有效運用。 四、勞委會職業訓練局參考職訓券試辦成 效,並邀集各執行單位檢討認為有重 新修正或設計執行機制之必要,以增 進持券者、訓練職類與就業關係之連 結,俾善用訓練券資源,達到訓用合
監察院公報【第2653 期】 ‧37‧ 一,促進就業的目標。刻正研議修訂 「非自願性失業勞工及特定對象職業 訓練券試辦要點」為「職業訓練券實 施計畫」(草案),預定於九十二年 一月一日起實施。 五、職訓券之實施,係職訓局推動身心障 礙者職業訓練之一環,如障礙程度較 重之身心障礙者,無法透過職訓券之 方式選擇適當之訓練單位,亦可選擇 其他訓練模式,獲得適訓之職業訓練。 六、改進措施: (一)依「職業訓練券實施計畫」(草案 )規劃方向,擬由勞委會職訓局所 屬各職業訓練中心評選服務轄區內 具有能力辦理職訓課程之訓練單位 ,審查其所送訓練計畫組合,經上 開程序評鑑合格之訓練單位、職類 班次,職業訓練中心需與其簽訂合 作契約,並造冊送各地就業服務中 心運用及登載職訓局職業訓練網。 其中辦理訓練單位資格評鑑項目, 包含訓練崗位數、訓練場地、設備 、設施、師資與教材、行政管理及 以往辦理類似班次學員滿意度、就 業率等。 (二)職業訓練券之開立,係採就業諮詢 核給制,非屬資格認定申請制,民 眾經各地就業服務中心三合一窗口 職訓諮詢,評估認以職業訓練能達 成促進就業效益者,依現有職訓網 路轉介參加訓練,或其他政府單位 所規劃辦理之相關訓練等,如無政 府主辦或委辦之訓練機會,始得開 立職訓券安排參加前項經評鑑合格 訓練單位所辦理經審查核定之職類 班次,上項經審查核定之職類班次 不限定需為全日制白天班之職業訓 練,以善用訓練資源,提昇參訓者 就業技能。 (三)參訓學員結訓後,訓練單位應積極 推介輔導就業,以達成促進就業之 目標。 (四)另勞委會職訓局為推動身心障礙者 職業訓練,採行下列措施: 1.專案補助相關機構、團體辦理身 心障礙者養成及進修訓練,每年 約補助四十個單位,六十至七十 個訓練職類,提供約一千三百個 訓練機會,該等機構、團體均為 身心障礙者專業單位,具有身心 障礙者專業知識、教學經驗及輔 助設施、教材等,能依據身心障 礙者障礙類別及程度之不同,提 供個別化之身心障礙者職業訓練。 2.將身心障礙者納入職訓券適用對 象,其目的在於身心障礙者可就 近向職業訓練機構、學校、技藝 補習班、或附設職業訓練機構之 事業單位報名參加一般職業訓練 (並非完全為身心障礙者所開辦 之專班),以擴大民間等其他資 源辦理職業訓練,並促進身心障 礙者參加職業訓練之意願,而囿 於政府資源有限,尚難完全補助 該等民間單位購置相關輔助設施 ,然對於障礙程度較輕之身心障 礙者,亦不失為接受補助參加職 業訓練之管道,障礙程度較重而 需相關輔助設施始能施訓者,如 無法採職訓券模式選擇適當之職 業訓練單位,可選擇參加前項專 案養成及進修訓練。
監察院公報【第2653 期】 ‧38‧ 3.勞委會職訓局刻正研訂「補助辦 理身心障礙者訓用合一職業訓練 實施計畫」,期能結合事業單位 、團體之訓練資源及就業機會, 安排身心障礙者逕至事業單位、 團體接受訓練,並於結訓後隨即 僱用身心障礙者擔任所接受訓練 之工作,以達訓用合一之目的。 肆、勞工保險失業給付尚乏詳細之評估與調 整,致使預估與實際核付金額落差甚鉅 ,又失業給付期限未能與失業率及失業 週數結合,未符需要,致效能不彰,顯 欠允當。 一、有關政府對於勞工失業給付,缺乏詳 細之評估與調整,致使預估與實際核 付金額落差甚鉅一節: 失業保險開辦前,勞委會於八十四年 曾委託林○博士依該會規劃之「失業 保險實施辦法立案要點」精算所需費 率,約為○.七六五○%至○.九七 七五%範圍內,初步定其費率為百分 之一;開辦本項業務原應依所需費率 徵收保費,惟考量經濟不景氣、失業 勞工持續增加,行政院爰以不增加勞 資雙方保費負擔原則下,對於失業給 付所需財源,於勞工保險普通事故保 險費率百分之六.五內調整提撥,依 勞保局開辦本項業務之資料統計,失 業給付年度所收之保險費,仍足支應 給付所需。又勞保局曾預估給付支出 情形,以「勞工保險條例」第六條第 一項第一款至第五款及第八條第一項 第一款及第二款規定之本國籍被保險 人四、七一○萬人,估計失業率若百 分之三時,平均月投保薪資約三萬元 ,約需一百多億元。九十年度失業給 付預算,勞保局係於八十九年元月依 據八十八年一月一日開辦後受理、核 付件數之成長及當時適用之勞工保險 失業給付實施辦法等因素推估編列。 由於經濟景氣衰退,導致失業率升高 ,勞工失業人數增加,為照顧更多失 業勞工,於九十年一月一日修正實施 「勞工保險失業給付實施辦法」,其 修正重點有:(一)放寬非自願性離職 範圍。(二)給付條件由參加勞保滿二 年,修正為繳納失業保險費滿一年; 因而造成合乎請領失業給付資格者驟 增。惟勞保局係於八十九年三月編列 預算,無法將相關因素納入考量,致 九十年失業給付決算數較預算數增加 近五十五億餘元。 二、有關九十一年二月失業勞工適用失業 給付佔總投保人數百分之六十一點六 ,又現行之投保薪資,尚乏審查辦法 與標準,相關機關允宜檢討一節: 依現行「勞工保險失業給付實施辦法 」第二條之規定:失業給付係以勞工 保險條例第六條第一項第一款至第五 款與第八條第一項第一款及第二款規 定之本國籍被保險人為給付適用對象 。亦即以有固定雇主之勞保被保險人 為適用對象。鑑於無一定雇主等勞工 ,或僱傭關係不明確,或無僱傭關係 ,失業認定困難,爰參考先進國家施 行成例,以僱傭關係明確之本國籍被 保險人為給付適用對象。而基於權利 義務對等原則,對於以職業工會等身 分投保者,免收其失業給付適用部份 之保險費率,即其勞保普通事故保險 費率按五.五%計收。 另為加強保障勞工生活與就業安全,
監察院公報【第2653 期】 ‧39‧ 業已完成「就業保險法」之立法工作 (總統業於九十一年五月十五日公布 ,行政院定自九十二年一月一日施行 )。上開法案,將強制加保對象擴及 於所有受僱之本國籍勞工,屆時無一 定雇主勞工於不同雇主之間轉換工作 ,均可於受僱期間以其雇主為投保單 位,參加就業保險為被保險人。 查世界各國辦理失業保險經驗,給付 金額約在平均薪資(或投保薪資)百 分之四十至百分之七十範圍內發給, 爰參照其他實施失業保險國家經驗, 將給付金額訂為平均月投保薪資百分 之六十發給,其給付標準尚稱妥適, 且依勞保局之統計,失業給付平均每 件核付金額約一六、一○○元,尚高 於現今基本工資一五、八四○元。 至於所提平均薪資高薪低報,導致給 付水準偏低之問題,因社會保險以保 障被保險人基本生活為主並兼顧其原 有生活水準之原則,故多以訂定「投 保薪資分級表」,於其分級表內規範 給付保障之上、下限(現今最高投保 薪資為四二、○○○元),而失業保 險爰依上開原則提供失業勞工失業期 間基本生活之保障;至於如何落實投 保薪資申報,除由勞保局加強對投保 單位及被保險人之宣導,建立正確加 保觀念外,該局及各區勞動檢查所亦 正積極進行查核,以落實對失業勞工 之保障。 三、有關勞工保險失業給付限制尚乏審查 辦法與標準,宜妥慎檢討一節: 為保障失業勞工生活,使能迅速再就 業,促進社會安全及經濟發展,自民 國八十八年開辦勞工保險失業給付, 以達到就業安全的目標。至於明定失 業給付條件之目的,在於確定領取失 業給付者,必須具有工作能力及工作 意願,且非無正當理由不接受推介就 業或安排職業訓練或失業期間另有其 他工作收入超過基本工資;又其另有 工作之收入亦應有適當之限制,以免 因就業期間之收入反高於失業前之工 作報酬,影響勞動意願,因此勞工保 險失業給付實施辦法第九條第二項明 定「受領失業給付期間另有工作者, 其該月工作收入加上失業給付之總額 超過平均月投保薪資百分之八十部分 ,應自失業給付中扣除」,同辦法第 十六條並規定勞工於受領失業給付期 間,另有其他工作收入者應於申請失 業認定或辦理失業再認定時,告知原 公立就業服務機構。另勞委會前於九 十一年四月八日召開「研商勞工保險 失業給付查核會議」並訂定「勞工保 險失業給付查核實施計畫」,為貫徹 勞工保險失業給付業務相關法令之執 行,落實辦理失業認定事宜,針對虛 設行號掛名加保情形、申請人離職證 明切結之案件、申請人非自願性離職 事由、申請人不接受推介就業理由及 申請人失業期間另有工作收入等事項 進行經常性、專案性及檢舉性查核, 勞保局、職訓局應每月就查核結果進 行檢討,並將檢討結果於每季季末提 報督導小組;督導小組每季召開定期 會議,就查核結果進行審查。 四、有關勞工保險失業給付期限未能與失 業率及失業週數結合,未符失業勞工 之需要一節: 自民國八十八年開辦勞工保險失業給
監察院公報【第2653 期】 ‧40‧ 付以來,勞工團體、民意代表及有關 各界迭有反應適度擴大失業給付適用 對象,且鑑於近年來失業率居高不下 ,為加強保障勞工失業期間之基本生 活,配合勞工平均失業週期,勞委會 於八十八年七月三十日及八十九年十 二月三十日二次修正「勞工保險失業 給付實施辦法」,其中失業給付請領 標準從月平均投保薪資百分之五十, 放寬至百分之六十。失業給付週數從 繳納失業給付保險費未滿五年者,失 業給付期限由三個月延長為六個月並 取消各階段及終生給付上限規定。 由於近年來失業率上升,故九十年度 失業者平均失業期間為二十六點一週 ,九十一年一月份為三十點四週。惟 失業給付制度係考量台灣整體長期之 經濟發展狀況,又為防止失業勞工過 度依賴失業給付,並激勵其迅速再就 業,世界各國發放失業給付之週數約 五至三十週,故現今勞保失業給付期 限為六個月(計約二十六週)尚屬妥 適。 另「就業保險法」將於九十二年一月 一日施行,為提昇勞工就業技能,促 進就業,保障勞工職業訓練及失業一 定期間之基本生活,故失業勞工合併 領取失業給付及職業訓練生活津貼計 長達十二個月(約五十二週)。 五、有關勞工保險失業給付與職業訓練未 能有效結合,致效能不彰一節: 為因應經濟情勢及實際就業、職業訓 練狀況,二次修正勞工保險失業給付 實施辦法,業於八十九年十二月三十 日廢止「勞工保險失業認定暨失業給 付審核準則」。依據現行「勞工保險 失業給付實施辦法」第七條規定:「 申請人對於公立就業服務機構推介之 工作,有下列情事之一而不接受者, 仍得請領失業給付。一、工資低於離 職當月工資三分之二。二、與原任工 作性質之教育、訓練及專長不同或不 相似。三、工作地點位於申請人辦理 求職登記時所填希望工作地點及原工 作所在地以外之縣(市),且距離申 請人日常居住處所三十公里以上。」 由於目前失業保險業務係以行政命令 方式開辦,僅能提供被保險人失業期 間基本生活保障,並無法有效解決失 業問題。為建構完善之就業安全體系 ,結合就業諮詢、就業服務及職業訓 練,制定「就業保險法」,該法將於 九十二年一月一日施行,未來勞委會 將結合政府相關部門及民間就業服務 與職業訓練資源,加強辦理就業諮詢 與職業訓練,提昇勞工就業技能,減 少失業衝擊,對於接受職業訓練期間 之勞工,發給職業訓練生活津貼,以 安定其受訓期間之基本生活,並為強 化勞工就業能力,於就業保險應收保 險費百分之十範圍內提撥專款,作為 辦理在職與失業勞工之職業訓練費用 暨獎助雇主僱用本國籍失業勞工。 六、有關勞委會以層級較低之勞工保險失 業給付實施辦法排除勞工保險條例中 保費之規定,降低職業工會保費為百 分之一,違反法律優位原則,顯欠妥 當一節: 依據「勞工保險條例」第二條規定: 失業給付係勞工保險普通事故給付之 一,又依據該條例第十三條、七十四 條規定,勞工保險之普通事故保險費
監察院公報【第2653 期】 ‧41‧ 率由中央主管機關按被保險人月投保 金額薪資百分之六點五至百分之十一 擬訂;而失業保險之保險費率、實施 地區、時間及辦法由行政院以命令定 之,故「勞工保險失業給付實施辦法 」依據本條例第七十四條授權明定失 業給付保險費率為百分之一。該業務 開辦時,原應另行徵收保費,惟考量 當前經濟景況,以不增加勞資雙方保 費負擔原則下,其所需財源於勞保普 通事故保險費率百分之六點五內調整 提撥,另基於權利義務對等原則,將 不適用失業給付之保險人,其普通事 故保險費率扣除失業給付部分之保險 費率,即其普通事故保險費率按百分 之五點五計收。 「就業保險法」已於九十一年五月十 五日經總統公布,將於九十二年一月 一日施行。針對失業給付單獨立法後 ,避免雙重徵收保費情事,勞工保險 普通事故保險費率應配合調整,故就 業保險法第四十一條明定自該法施行 之日起,被保險人之勞工保險普通事 故保險費率,應按被保險人當月之月 投保金額薪資百分之一調降之,不受 「勞工保險條例」第十三條第一項規 定之限制。 七、有關勞委會對於失業勞工僅推動就業 券及職業訓練券,對於該等勞工失業 給付之權益,未盡周妥,宜予檢討一 節: (一)依據「勞工保險失業給付實施辦法 」第十條規定,失業勞工領取失業 給付後,其失業給付繳費年資應重 行起算,故勞工如領取失業給付後 ,僅失業給付繳費年資須重行起算 ,至於勞保保險年資仍予保留併計 ,並未影響其請領老年給付權益。 (二)近來國內就業市場因景氣低迷,致 失業率居高不下,造成失業人口增 加,使失業者生活陷入困境,協助 失業者迅速再就業,實為勞委會責 無旁貸之任務。 (三)該會為確保及安定失業者失業期間 之基本生活,除執行各項就業措施 外,亦訂定「就業促進津貼實施要 點」,該要點內容包括求職交通津 貼、臨時工作津貼、訓練生活津貼 、創業貸款利息補貼、僱用獎助津 貼及就業推介媒合津貼等,期透過 各項津貼補助,以協助及激勵失業 者迅速再就業。 (四)前項要點中「僱用獎助津貼」,係 鼓勵雇主僱用關廠歇業失業勞工、 特定對象及其他依法被資遣之失業 勞工等,以增進該等人員之就業機 會。凡雇主僱用經政府機構推介或 經政府委託從事就業促進之相關機 構、團體推介後之關廠歇業失業勞 工、就業服務法第二十四條第一項 特定對象及其他依法被資遣之失業 勞工,連續工作達三個月以上者, 即可發給雇主僱用獎助津貼。 (五)有鑒於「僱用獎助津貼」之發給僅 限於雇主僱用經政府機構推介或經 政府委託從事就業促進之相關機構 、團體推介者(身障者、原住民除 外)。該會為擴大失業者尋職管道 ,增加其就業機會,另訂定「就業 券試辦要點」,凡持有就業券之求 職者,可自行尋求工作,於獲雇主 僱用時,即將就業券交予雇主,雇
監察院公報【第2653 期】 ‧42‧ 主僱用就業券持有人符合資格者, 依規定申請僱用獎助津貼,期結合 僱用獎助津貼,擴大求職者就業管 道。 (六)又為使就業促進津貼有整體性規劃 與實施,「就業券試辦要點」業自 九十年六月三十日起停止試辦,並 納入「就業促進津貼實施辦法」中 研議。 (七)改進措施: 為落實照顧失業勞工基本生活及促 進其迅速再就業,並強化法源依據 ,勞委會研議將「就業促進津貼實 施要點」提昇法令位階,修正為「 就業促進津貼實施辦法」,期整合 各項津貼之補助,增進就業服務功 能。 伍、臨時工作津貼、創業貸款利息補貼及僱 用獎助津貼之核發,成效不彰。 一、有關九十年臨時工作津貼實領人數占 關廠歇業或業務緊縮失業人口數百分 之三點九八,且欠缺稽核制度,成效 不彰,宜檢討改進一節: (一)失業者至就業服務中心做求職登記 後,就業服務中心會依其意願、專 長為其推介適合之工作,使其進入 就業市場。 (二)無法順利推介成功,且符合下列條 件之失業者才可領取臨時工作津貼: 因關廠歇業及其他依法被資遣之失 業者、設籍於九二一大地震災區之 失業者、參加職業工會之勞工保險 被保險人或參加農保之失業者,具 有工作能力與工作意願,並有下列 情形者,得申請本項津貼: 1.有向公立就業服務機構登記求職 七日後,無法獲得推介就業或安 排參加職業訓練;但無正當理由 而拒絕推介就業或參加職業訓練 者,不得申請。 2.申請之日前三年內曾工作累計達 三個月或參加勞工、農民保險三 個月以上。惟設籍於九二一大地 震災區之失業者不在此限。 3.年滿十五歲至六十五歲者,或未 滿十五歲但已國中畢業者。 符合上述規定之申請人可檢具各項 文件提出申請,再轉送政府或非營 利機構分派臨時性工作。 (三)因領取臨時工作津貼者有條件之限 制,且政府或非營利機構之臨時性 工作有限,並非所有失業者皆需透 過領取臨時工作津貼再進入就業市 場。 (四)臨時工作津貼為一緊急性措施,目 的是為紓緩失業者短期失業期間之 生活壓力,且領取臨時工作津貼者 每週有二日有給求職假,除可自行 尋職外,就業服務中心也會為其推 介就業,並追蹤其求職狀況,均為 鼓勵其儘速進入就業市場。 (五)改進措施: 勞委會職訓局已設計「就業促進相 關津貼訪查記錄表」及「就業促進 相關津貼訪查統計表」,並函知各 就業服務中心不定期派員進行訪查 ,並將訪查情形回報。 二、有關九十年台灣地區廣義失業人口為 六十五萬餘人,惟統計八十七年七月 份至九十年十二月底止,僅核准七十 七件申請創業貸款案,顯見未能充分 發揮效用一節:
監察院公報【第2653 期】 ‧43‧ (一)勞委會自八十七年七月至九十一年 八月份共核准九十八件失業勞工創 業貸款申請案。創業貸款之資金係 由銀行提供,故申請人之信用、還 款能力等需由銀行進行審核同意後 放款,故創業貸款利息補貼之申請 人較少。為加強改進勞委會職訓局 未來將朝向以創業輔導團之機制, 提供創業者創業前之風險評估,及 創業後之持續輔導。 (二)青輔會辦理青年創業貸款輔導,主 要的目的在協助有創業能力之青年 開創事業,解決其資金短缺問題, 增加就業機會。整體而言,兼具經 濟與社會政策雙重意義,在經濟政 策方面,透過青年創業貸款的提供 ,扶植中小企業,增進生產、創造 財富、繁榮社會,進而推動國家經 濟之發展,在社會政策方面,協助 青年開拓事業、發展抱負、實現人 生理想、增加其對政府的向心力, 並創造就業機會,解決社會問題。 該項貸款自民國五十七年二月開辦 ,迄九十一年六月底止,計輔導創 業青年二一、六○一人,設立一五 、二七三家事業,貸放青年創業貸 款新台幣一九五億六萬餘元,創業 初期增加就業機會一一三、八四七 個,經青輔會輔導有成的創業青年 甚多,其中較具代表性的有光群雷 射、西陵電子、飛牛牧場、永信藥 品、美吾華、信立化工、銀箭快速 沖印、台大蘭園、長頸鹿美語等企 業。 (三)青年創業貸款與失業勞工創業貸款 不論就政策目的、資金來源、輔導 對象或貸款方式等皆不相同,略述 如下: 1.政策目的:青年創業貸款主要的 目的在扶植中小企業、創造就業 機會、促進國家經濟之發展;失 業勞工創業貸款主要目的係以社 會福利觀念補貼失業勞工貸款利 率,幫助其重回職場為目標。 2.資金來源:青年創業貸款係由中 美基金搭配銀行自有資金共同辦 理;失業勞工創業貸款則由銀行 自有資金辦理,勞委會運用就業 安定基金補貼勞工貸款利息。 3.輔導對象:青年創業貸款為二十 三歲至四十五歲符合相關規定之 初創業青年;失業勞工創業貸款 為申請之日前三年內曾工作計達 三個月或參加勞工或農民保險達 三個月以上之失業勞工。 4.貸款方式:青年創業貸款指定六 家銀行辦理,利率為台灣銀行基 本放款利率之七成,政府不做利 息補貼;失業勞工創業貸款係由 申請人個別向銀行辦理貸款後, 再由勞委會運用就業安定基金定 額補貼勞工申貸利率六%,補貼 期限五年。 綜觀青輔會之青年創業貸款與勞委 會之創業貸款利息補貼,雖名為創 業貸款,但不論從政策目的、資金 來源、輔導對象或貸款方式來看, 兩者區分極為明確,並無功能重疊 錯置之情形。 三、有關僱用獎助津貼核發欠缺稽核制度 ,易滋弊端一節: (一)僱用獎助津貼之目的是為鼓勵雇主
監察院公報【第2653 期】 ‧44‧ 僱用關廠歇業失業勞工或其他依法 被資遣之失業者,以增進其就業機 會;雇主每僱用一名連續達三個月 以上者,按僱用人數,每名每月補 助新台幣五、○○○元。九十一年 一月至六月共提供九、二九三個就 業機會,核發金額新台幣一四七、 三四二、○○○元。 (二)未來「就業促進津貼辦法」已有相 關規範,可避免不肖雇主假僱用非 自願性失業勞工之名,行詐領僱用 獎助津貼之情形發生。 (三)改進措施: 勞委會職訓局已設計「就業促進相 關津貼訪查記錄表」及「就業促進 相關津貼訪查統計表」,並函知各 就業服務中心不定期派員進行訪查 ,並將訪查情形回報。 陸、資遣通報制度未能有效落實,相關主管 機關執法不力,顯有疏失。 一、各地重大勞資爭議資遣案件,雖有些 未依法及時向各公立就業服務機構辦 理通報,但各就業服務機構均能主動 與當地縣(市)政府聯絡,取得被資 遣員工資料,並派員前往資遣員工之 事業單位,講解說明提供政府促進就 業相關資訊與提供必要服務。 二、改進措施: 「就業服務法」第三十三條規定,雇 主資遣員工時,應於員工離職之十日 前列冊通報當地主管機關及公立就業 服務機構。惟大多數雇主為免勞資爭 議擴大,多採不預警方式資遣員工, 未依法通報。勞委會將續予加強督促 執行,並依法處以罰鍰。 行政院 函 發文日期:中華民國92 年8 月13 日 發文字號:院臺勞字第0920041363 號
主旨:貴院函,為本院函復:對貴院糾正政 府未能有效整合公、私立就業服務機 構體系,造成就業輔導業務事權不一 ,致就業服務績效不彰,且職業訓練 欠缺完整體系及評鑑機制,影響訓練 成效。又勞工保險失業給付尚乏詳細 之評估與調查,導致預估與實際核付 金額落差甚鉅及臨時工作津貼、創業 貸款利息補貼、僱用獎助津貼之核發 ,成效不彰,資遣通報制度未能落實 執行,均有未當案辦理情形案。檢附 貴院審核意見,囑轉知所屬檢討改進 見復一案,經交據本院勞委會會商本 院青輔會、本院退輔會、本院農委會 、本院研考會、本院人事行政局、本 院主計處、台北市政府及高雄市政府 等有關機關函報檢討改善情形,並經 酌整,尚屬實情,復請 查照。 說明: 一、復 貴院九十二年五月十二日(九二) 院台財字第○九二二二○○三三四號 函。 二、檢附本案之檢討改善情形一份。 院長 游錫堃
監察院公報【第2653 期】 ‧45‧ 本案之檢討改善情形 糾正事項一 我國就業輔導事權不一,就業服務機構未能有效整合公私、立就業服務機構體 系,且人力及專業性不足,致就業服務績效不彰 審核意見一 有關就業輔導事權不統一之改進措施,及勞委會正依「就業服務法」規定研修 「公立就業服務機構設置準則」,據以明確規範中央與地方公立就業機構之職 掌與權責部分,相關主管機關未說明目前修正方向及內容,與「公立就業服務 機構設置準則」之研修進度與情形。 辦理說明 行政院研考會: 「我國就業輔導事權不統一」一節,行政院為落實業務與組織的合理劃分,強 化人力資源規劃,提供勞動力品質,在九十一年四月函送立法院審議之「行政 院組織法」修正草案中,規劃設置「勞動及人力資源部」,主要業務包括:勞 資關係、勞動條件、勞工福利、勞工保險、勞工安全衛生、勞工檢查、勞動人 力規劃、勞工統計、外勞管理、職業訓練、技能檢定、就業服務、就業保險( 行政院勞委會移入)、青年職業訓練及就業服務業務(行政院青輔會移入)等 ,在合理的範圍內統一就業輔導事權,以避免職掌重疊,並力求權責分明;有 關就業服務之事權統一與資源整合議題業已納入行政院組織改造「厚生勞動工 作圈」通盤檢討中。 行政院勞委會: 一、有關研修「公立就業服務機構設置準則」,本會曾於九十一年十二月三十 一日勞職業字第○九一○二○七五五二號報行政院審核,經該院於九十二 年三月十日院臺勞字第○九二○○○五七八六函復:請邀集相關機關詳加 研酌後再行報院。 二、本會依其指示復於九十二年五月一日邀集行政院人事行政局、行政院研考 會、行政院原民會等相關單位,召開「研商直轄市公立就業服務機構設置 準則修正草案第二次會議」,並將修正後之條文於九十二年六月二日勞職 業字第○九二○二○三六六一號函再陳核行政院在案;並經該院九十二年 六月三十日院臺勞字第○九二○○三一七一○號函復准予修正核定,本會 於九十二年七月十四日發布施行。 審核意見二 據函復檢討改進情形表示:「目前公立就業服務中心針對就業諮商、就業促進 研習等就業專業服務委外辦理,同時將規劃由民間參與就業推介媒合,以提昇 私立就業服務機構之專業。」未見相關改進措施及規劃作業情形;另對於我國 就業服務機構未能有效整合公私立就業服務機構體系部分,亦未見相關具體措 施。 辦理說明 行政院勞委會: 一、本會已於九十二年一月八日勞職業字第○九二○二○○○三八號訂定「行 政院勞工委員會結合人民團體設立就業服務據點經費補助計畫」,係以結 合人民團體等民間資源,掌握地區勞動力之供給及需求,建立在地化、普 及化之區域性就業服務網絡,擴展協助失業勞工就業,促進其迅速再就業
監察院公報【第2653 期】 ‧46‧ ,提升就業媒合績效,受理申請截止日為九十二年三月十日。案經審核核 定十二個單位投入此項工作。 二、除結合民間團體設立就業服務據點外,本會另推動「就業推介媒合津貼」 業務,其主要內容係公立就服機構受理失業民眾求職,因無適當就業機會 可資推介時,可將該等人員轉介至指定單位,由其推介媒合,並依媒合成 功者之人數、工作期間及就業能力,發放津貼予指定單位,期有效結合公 私立就業服務體系,以擴大就業服務網絡,目前預計指定十六個單位投入 本項工作。 行政院青輔會: 本會除與勞委會職訓局就相關業務密切聯繫,並結合教育部、勞委會共同進行 大專畢業青年生涯發展意向調查與畢業生就業追蹤調查,以期根本大專生就業 問題核心並提出有效因應方案。 行政院退輔會: 一、本會為增進網路求職求才效能,將網路求職求才系統委託一○四人力銀行 設置並負責管理與維護,同時運用其就業媒合系統辦理榮民就業媒合。 二、本會九十二年度與「台灣加盟促進協會」合作,在全省各縣市辦理「連鎖 加盟創業諮詢與說明會」,計二十二場次,提供小本創業相關資訊,以建 立輔導榮民創業之機制。 三、為協助榮民透過生涯輔導、就業諮商與職業適性評量,以瞭解個人優勢特 質,建立正確職業觀念,作為生涯規劃與就業選擇之參考,九十一年度與 「中華民國生涯成長協會」合作,於全省各縣市配合大型現場就業媒合活 動辦理「榮民就業諮商與職業適性評量」計二十二次,九十二年度計畫委 由一一一一人力銀行再辦理二十二場次。 台北市政府勞工局: 有關未能整合公私立就業服務機構體系部份,本局就業服務中心訂有「台北市 結合勞資團體拓展就業服務網絡實施計畫」及「台北市結合人力供應業拓展就 業服務網絡計畫」,積極推動勞資團體及私立就業服務機構加入計畫,透過策 略結盟方式,形成台北市就業資源運籌管理平台,提供求職求才者更便捷、有 效的就業服務。 高雄市政府: 本府勞工局訓練就業中心依據就業服務法第十七條規定及就業保險法第十二條 及第二十五條規定辦理九十二年度委外就業促進研習活動及深度就業諮詢業務 ,其目的為因應民國九十二年「就業保險法」之施行,公立就業服務中心全面 加強辦理就業服務、職業訓練、失業給付三合一業務,其透過專業化就業諮詢 服務,協助求職者及失業給付請領者提昇就業適應及尋職技能,以有效促進職 場供需媒合。同時為擴大民間團體參與機會,擬將「深度就業諮詢及就業促進 研習」業務結合民間團體辦理。並配合公立就業服務中心現有之就業服務流程 ,針對公立就業服務中心轉介之求職者或失業給付請領者提供深度就業諮詢及 就業促進研習活動。針對深度諮詢及就業促進研習活動之個案,進行追蹤輔導
監察院公報【第2653 期】 ‧47‧ 及推介就業服務,每月推介就業率至少應達二十五%;同時建立個案管理制度 ,以有效協助失業者儘速在就業及穩定就業目標。訂定強化公立就業服務中心 就業諮詢功能計畫:(一)預期績效:九十二年四月-九十二年十二月服務人數 五、七六○人;推介就業服務一、四四○人、追蹤輔導一七、二八○人次(二) 就業促進研習:每月辦理八場,每場三十人,研習主題為求職資源運用&求職 技巧、探索職場生態&職場陷阱、自我探索&職涯規劃技巧、履歷表製作&面 談技巧、求職動能激發&自信強化、求職媒介&社會資源運用。 審核意見三 據行政院表示:我國公立就業服務機構所掌握之就業機會較具公信力與安全性 ,且對身心障礙等特定對象之就業服務,係一般民間與其他管道所無法提供, 故其利用率不高與其他國家均大同小異。請提出其他國家之具體數據,並請說 明改進措施之具體績效評估指標及改善結果。 辦理說明 行政院勞委會: 一、為有效解決失業問題,自九十二年就業保險法全面實施以來,全國各公立 就業服務中心及站,立即開辦結合失業給付、就業服務與職業訓練三合一 就業服務流程,並將失業給付業務,與就業諮詢、就業促進及職業訓練等 配套措施緊密結合,採取單一窗口便民服務,由失業登記、就業諮詢、就 業推介、職業訓練諮詢、失業認定,均由單一窗口提供全程服務。其整體 服務流程包含:設置「接待區」、「就業資訊區」、「綜合服務區」、「 雇主服務區」、「諮詢服務區」等五大服務區。 二、本會職訓局各就業服務中心於九十一年三月份開始進行硬體設備之整修與 擴充,而個案管理及深度諮詢業務之相關人員,則於七月份進駐各就業服 務中心進行服務,現階段已全面開辦三合一業務。以九十一年十二月與九 十年至九十一年五月(月平均值)「三合一」開辦前就業服務績效比較, 針對請領失業給付者,在推介人次、推介就業人數、安排職業訓練人數、 推介率以及推介成功率部分,皆有顯著成長,其中推介率成長高達百分之 九十一點七四,推介成功率則成長達百分之十二點六八。 三、而針對不同失業者的能力及需求,公立就業服務中心提供不同層次的就業 諮詢服務,自九十一年七月開辦至十二月底止辦理情形如下: (一)本會職訓局局屬五區就業服務中心:個案管理服務人數二、九○○人 、深度就業諮詢服務人數八四六人、就業促進研習活動服務人數一、 七五八人、推介應徵人次一、三○二人、推介就業人數七五三人、結 案人數二六五人、推介就業率二五.九六%。 (二)台北市及高雄市部分: 1.台北市政府勞工局就業服務中心進用個案管理員六人,自七月至十 二月辦理情形如下:個案管理服務人數七二八人、推介應徵人次六 九八人、個案管理推介就業人數六九八人次及穩定就業二八二人次 、結案人數二八七人;推介就業率三八.八七%。委外深度就業諮 詢服務人數三二一人、就業促進研習活動服務人數二、六九六人、 推介就業人數三七八人、推介就業率一二.五二%。
監察院公報【第2653 期】 ‧48‧ 2.高雄市政府勞工局訓練就業中心進用個案管理員五人,自八月至十 二月辦理情形如下:個案管理服務人數二九八人、深度就業諮詢服 務人數十五人、就業促進研習活動服務人數一二五人、推介應徵人 次二三二人、推介就業人數四十四人、結案人數四十人;推介就業 率一四.八%。 四、參考OECD 國家、英國、美國、日本與澳洲等國的就業服務政策與改革措 施後發現,各國之改革主要分為四個層面: (一)改革作業方式,包括「顧客導向」的服務觀念、職缺資訊的公開化與 透明化、建立尋職者履歷表資料庫、建立服務網路與推動行銷計畫等。 (二)積極性就業政策,包括加強注意失業者尋職行為與就業諮商服務更為 個人化與深度化。 (三)組織分權化。 (四)促進市場競爭。 五、有關各國公立就業服機構求才利用率之比較,去(九十一)年,我國求才 利用率為二六.六四%,相較於亞洲臨近國家日本於同年為二七.八%, 相差不大。又依行政院主計處人力資源統計分析中,我國失業者透過公立 就業服務機構找尋工作者由二○○一年之八.四六%,增至十八.五九% (至二○○三年四月),增加近十個百分點。且本會亦於今年六月開辦官 方求職網站-全國就業e網,利用網路將實體面之公立就業服務機構之職 缺與求職者及網站之虛擬面結合,提供更快速、更便捷之服務。 審核意見四 對於公立就業服務機構人力及專業性不足部分,未見如何再強化人力專業性之 具體改善方案。 辦理說明 行政院勞委會: 一、有關公立就業服務機構因受限於人力精簡政策,在編制與約聘僱人力無法 增加下,將訂定「就業服務相關工作勞務需求計畫」,以補人力之不足。 二、本會將採取與民間事業機構策略聯盟方式,鼓勵民間參與投入就業服務工 作,並將部分勞務需求外包,以培養民間對就業服務工作參與之能力,共 同解決失業問題。 三、本會自推動永續就業工程計畫、多元就業開發方案以來為協助計畫之推動 與就業機會開發,並加強雇主服務工作,陸續招聘就業促進員一○○人。 四、本會九十一年度起陸續招聘個案管理員五十人,並調派職業訓練師十七人 至公立就業服務辦理就業諮詢與職業訓練諮詢等服務,期望提供失業者個 人化之專業就業服務。 五、又為解決公立就業服務機構人力不足問題,並擴大與民間團體、專業團體 之合作管道,本會結合民間團體辦理「運用社工輔導員促進原住民就業安 定方案」、「深度就業諮詢及就業促進研習活動」、「創業諮詢服務」等 方案,期提供失業者或求職人多元化之就業機會,增進其就業適應能力, 以達穩定就業之目的。 六、為提升公立就業服務機構工作人員專業知能,本會除針對新進個案管理員
監察院公報【第2653 期】 ‧49‧ 、職訓諮詢人員辦理職前及在職訓練外,並不定期針對相關人員辦理在職 訓練,同時亦機動性針對業務所面臨之問題召開相關研討會議,建立共識 ,以建立標準化之服務流程。 行政院青輔會: 有關就業服務業務改進方面,本會刻正研究將就業服務網站與行政業務分離, 以投入專業人力、進行專案管理方式,提高網站服務品質與成效。 行政院退輔會: 一、有關就業服務機構人力不足,將俟行政院組織法修正通過後,再配合調整。 二、本會為強化就業服務人員專業知識,提昇就業服務品質,每年均辦理「就 業服務人員專業訓練」,九十二年度訓練於四月上旬辦理,參加人員計有 各縣(市)榮民服務處總幹事及就業承辦人及訓練中心輔導室主任與承辦 人,課程主要內容:就業服務人員如何樂在工作、中年就業的心理調適與 突破、創新服務與顧客滿意、成功生涯之創造等。 台北市政府勞工局: 有關公立就業服務機構人力及專業性不足部分,本局就業服務中心自九十二年 度起編列單位預算,經由勞務外包派遣專業人力協助提供就業服務,以紓解人 力不足的問題;另一方面每年定期舉辦在職人員專業訓練,聘請專家學者講授 ,以提升服務人員之專業素質。 高雄市政府: 本府勞工局訓練就業中心目前從事就業服務業務之編制內人力僅六人(包括二 位就業站站長)綜理全市有關就業服務之業務,為補充嚴重不足之人力,不得 不借重臨時性之人力來維持櫃檯之運作,而對就業服務人員專業性不足之部分 ,除了平時的在職訓練外,亦經常選送人員參加相關之訓練課程,以充實其專 業知能。 審核意見五 有關公立就業服務機構行政作業程序緩慢部分,勞委會已完成網際網路就業資 訊系統之招標作業,預計九十二年一月建置完成,目前執行情形為何?又該項 措施對於提高雇主使用公立就業服務機構服務之意願及效能有何助益?並比較 說明公立就業服務機構有關行政作業程序,原有及修正改進情形如何? 辦理說明 行政院勞委會: 一、目前網際網路就業服務資訊系統,對於求職民眾登記資料及求才廠商工作 機會資料已能集中儲存於全國性資料庫系統,開發完成後將有即時性資料 可供運用,可有效提昇櫃台作業人員服務品質,紓解資料因無法統合造成 行政效率的瓶頸。為便利求職民眾及求才廠商的需求,本會職訓局之全國 就業e網於九十二年六月三日開站,網站提供二十四小時的線上客戶就業 e網服務。由於求職民眾及求才廠商除了可至就業服務據點,透過本系統 櫃台服務作業系統或民眾直接上網找工作、及廠商上網登錄工作機會,配 合系統提供之快速媒合作業服務,來提高求職民眾求職意願及廠商便利且 快速有效的求才目標。經統計截至九十二年六月底止,上網登記求職經推 介成功就業者計一、○九四人,求才廠商找到所需人才者計八四九人。
監察院公報【第2653 期】 ‧50‧ 二、本系統有關公立就業服務機構行政作業,配套措施則以推動三合一標準化 流程作業,將服務劃分為接待台、就業資訊區、綜合服務區、諮詢服務區 及雇主服務區,並訂定各項服務項目及標準作業規範方式來配合就業服務 資訊系統實施。 糾正事項二 我國職業訓練欠缺完整體系及評鑑機制,且施訓對象與訓練職種未能結合,致 無法符合就業市場需要,影響訓練成效。 審核意見一 行政院對於我國職業訓練機構分屬勞委會、退輔會、農委會等八個不同主管機 關、財團法人,造成訓練中心各自為政,訓練體系缺乏完整體系之情形,未有 具體改善。 辦理說明 行政院研考會: 「我國職業訓練欠缺完整體系」一節,為加速落實行政院組織改造後續工作, 行政院組織改造推動委員會下設政府民間夥伴小組、中央地方夥伴小組、中央 行政機關功能調整小組三個功能調整及經費、人事、法制三個配套機制小組, 將以職能檢討為重點,研議各訓練體系是否可由民間或地方自治團體辦理,予 以解除管制、委外或地方化,並依功能、效率取向檢討整併現有機關,希望能 建構具有彈性化之完整訓練體系;有關職業訓練之事權統一與資源整合議題業 已納入行政院組織改造「厚生勞動工作圈」通盤檢討中。 行政院勞委會: 一、為重新定位公訓機構功能,有效整合公部門訓練資源,全力投入失業者職 業訓練,本會已著手積極重建公共職訓體系,將本會職業訓練局所屬職訓 中心從單純的「職業訓練提供者」,轉換為高效能的「區域職業訓練運籌 中心」,扮演各區域訓練資源之規劃者、整合協調、評鑑者之角色,並將 隸屬各行政機關之公訓機構,納為各區域訓練資源提供者,以統合相關訓 練資源,以提供民眾更便捷及可信賴的職業訓練管道。 二、未來將配合行政院組織改造工作,將訓練業務及對象性質相同之青輔會青 年職訓中心改隸本會,以強化職訓體系之效能,對於隸屬退輔會、農委會 所屬職訓中心,因其以退伍軍人、農漁民為主要服務對象,有其特殊訓練 目的,將藉由橫向聯繫管道方式及本會各職訓中心整合、協調機制,建構 完整培訓體制。 行政院青輔會: 本會辦理職業訓練係以公開招標方式,對外徵求大專院校、專業訓練機構、財 團法人、社團法人及公司等單位,經評選後委託優勝單位辦理訓練。為使培訓 後之青年均能為產業所用,並使培訓職類及課程能切合產業需求,本會除委請 專業機構擔任培訓專案之專案協力群外,亦邀請產官學界之專家學者,參與規 劃相關課程內容,更於徵求培訓單位時,要求各培訓單位提出就業市場需求之 調查報告,其用意即在加強落實「訓用合一」,增進訓練成效,使專上人力能 充分運用。至於本會青年職訓中心於九十一年起即隨勞委會職訓局同步進行訓 練職類之調整,調減不適宜之職類:如考量不符就業市場需求的職類、須投入 大筆經費於機具設備上的職類、民間有能力有意願辦理的職類,以及招生情形
監察院公報【第2653 期】 ‧51‧ 及就業情形不佳的職類。預定逐年調減二十%職類,至民國九十三年將僅保留 四十%的四個符合就業市場所需之設計類核心職類。 行政院退輔會: 本會辦理退除役官兵職業訓練係法定責任,且有特殊與不可替代性,並依循國 家職訓、就業政策執行業務,與勞委會、青輔會等體系充分配合,建立良好互 動關係,本會訓練中心在職業訓練、技能檢定、就業服務之政策上,接受勞委 會職訓局指導或業者委託,機構間相輔相成,橫向連繫綿密暢通,無各自為政 、滯礙現象。 行政院農委會: 一、鑑於農民對於農業特殊需求,農業範圍內之訓練將續由本會規劃辦理;有 關農漁民離農轉業訓練,就專業功能及資源整合而言,則由勞委會公共職 業訓練及就業服務機構規劃辦理,以協助農漁民轉業。 二、另有關本會漁業署遠洋漁業開發中心部分,該中心職司我國漁船船員訓練 ,負責培訓各級漁船幹部船員及普通船員,改進漁業技術,提升船員素質 ,以配合我國漁業發展之需要,茲分述如下: (一)該中心各班次漁船船員訓練計畫、訓練課程標準、訓練教材、訓練機 具設備、教學方法等係依據我國漁船船員管理規則、專門職業及技術 人員考試法、特種考試漁船船員考試規則及聯合國國際海事組織( IMO)為加強漁船海上航行作業安全,於一九九五年通過「漁船船員 訓練發證及當值標準國際公約(以下簡稱STCWF)」等規定規劃設 計,使結訓學員均能順利取得符合STCWF 訓練標準的執業證書,確 保漁船航行安全,並能合法進出國際各港口為目標。 (二)為因應國內及國際法規規定,該中心於九十年修訂各訓練職類,包括 漁航、輪機及電信職類各科訓練課程標準計十五班次,並公告實施, 以符合實際需要,同時亦於去(九十一)年起委託基隆、蘇澳及澎湖 海事職業學校設立漁船船員訓練站,就近提供北部、東部及離島澎湖 地區漁友訓練機會,實際解決相關訓練發證問題。 (三)由於我國漁船船員勞動力結構特殊,在該中心受訓學員絕大部份是已 經實際在海上從事漁業勞動之人力,為進陞為漁船幹部船員,前往該 中心接受相關課程之訓練以取得執業證書;前來受訓之學員大部份是 自家漁船船主或由漁業公司荐送來受訓者,均能達到「隨用隨訓」、 「訓用合一」的訓練目標。至於養成訓練及輔導就業部份,將持續配 合各地區漁會加強辦理。 (四)該中心辦理之各項漁船船員訓練係符合國際公約要求之特殊訓練職種 ,屬於獨特之訓練體系,其訓練對象與訓練職類均能結合,均以提升 漁船船員素質為主要目標。該中心除了辦理漁船船員訓練外,並為落 實漁業管理體制及漁業政策之執行,如漁業經濟與政策議題、法規命 令之執行與宣導、漁業資訊電子化之推動、促進漁業升級、改善漁村 環境等,將持續辦理對漁政漁會及漁業經營人員相關訓練,以提昇產
監察院公報【第2653 期】 ‧52‧ 業競爭力。 三、本會為維護我國漁船船員海上作業安全,依據漁船船員管理規則及STCWF 公約對於漁船船員基本安全訓練準則規範,公告自去(九十一)年七月一 日起針對初領漁船船員手冊或最近五年內出海作業未達一年經歷之普通船 員實施漁船船員基本安全訓練,以培養漁民在漁船工作之緊急應變能力、 防止海難事故發生、對漁民海上生命財產安全有效達到保障之目的。 審核意見二 有關勞委會調整所屬六個職業訓練中心之訓練職類,請比較說明原訓練職類、 目前已調減及調增職類項目為何?調整後參訓人數情形如何? 辦理說明 行政院勞委會: 一、隨著產業結構與經濟發展快速變遷,加上企業快速外移以及加入WTO 之 衝擊,原有公共職業訓練機構開辦之職類,需配合就業市場變遷加速調整 。基此,為切合企業界人才需求,達成訓用合一之目標,本會職業訓練局 積極推動所屬職訓中心職類調整工作。 二、有關職訓中心之職類調整工作,採行調減、調整及新增等三種措施,其辦 理原則如下: (一)職類調減部份: 1.招生或就業情形不佳,且非區域產業所需者。 2.原有設備已不符就業市場需求者。 3.與其他職類課程多有重複之處,或可移撥至鄰近中心辦理者。 4.區域內訓練供給已足夠者。 (二)職類調整部份:具市場需求但訓練仍不普遍或民間尚不願投資辦理者 ,且設備不需大量投資者;經調整訓練課程、訓練對象,得以有效協 助失業者儘順就業者。 (三)新增職類部份:以能呼應產業需求、委外辦理為原則,自辦以政府投 資不會太多者為限。 三、本會六所職訓中心職類調整結果: (一)九十一年度核定所屬職訓中心調減三十三個職類,調整十二個職類, 新增三十個職類。 (二)九十二年度核定所屬職訓中心調減二十九個職類,調整二十九個職類 ,新增十八個職類。 (三)九十三年度核定所屬職訓中心調減十八個職類,調整三個職類,新增 二個職類。 四、另為配合區域人力供需情況,辦訓職類隨時視產業實際需求,機動增加訓 練班次,以達成提高各中心訓練容量一點二倍為目標,提高失業者參訓機 會。九十年度本會各職訓中心職前訓練結訓人數為五、四二五人次,九十 一年度已增加為六、七二八人次,提高比例達一點二倍。 審核意見三 對於訓練師資專長及現有員額不足、訓練對象與訓練職類未能結合部分,未提 出具體改善措施。 辦理說明 行政院勞委會:
監察院公報【第2653 期】 ‧53‧ 一、配合市場需求及職訓中心功能轉型,本局所屬各職訓中心由單純之職業訓 練提供者,轉型並推動下列工作: (一)擔任區域職業訓練資源整合、規劃購買、績效評鑑,及諮詢推介者角 色。 (二)調整訓練職類,保留民間訓練單位無法充分供給或不提供,但就業市 場有需求之自辦核心職類,並結合民間訓練資源,擴大訓練量。 二、配合職訓中心角色功能調整,辦理職訓師轉型訓練,現已規劃進行二階段 職業訓練師轉型訓練及角色與功能評估計畫,將職訓師轉型工作區分為訓 練規劃與管理師及職業訓練諮商師,第一階段已於九十一年度執行,計六 八一人次參加訓練;第二階段於今(九十二)年繼續辦理職訓師職務轉型 確認後之專業養成訓練課程。 三、奉行政院九十一年七月二十五日院授人力字第○九一○○二○九五七號函 核示,各職訓中心「現有員額除主任外,均出缺不補」後,對各中心訓練 師因退離之缺額,改由外聘師資方式因應,並導入企業實務技能,以提昇 訓練成效。 行政院退輔會: 一、本會訓練中心現有訓練師十五員,師資專長均與所教授之職類相符;現有 員額已管制,受政府組織再造影響,無法遴用。 二、訓練對象大致與訓練職類結合,推動「訓用合一」部份,已採「榮民優先 」、「未支領退休俸者優先」及「五十五歲以下優先」等三項優先措施, 目前訓練對象與職類結合度已大幅提昇;對職類性向不合人員,在訓額容 許下,一週內調整職類受訓,充分發揮訓練效能。 台北市政府勞工局: 一、本局職業訓練中心自九十二年度起,在本局政策採訓用合一模式指示下, 所有訓練職類之開辦需參考就業市場人力需求,先開發就業機會,再依企 業主所需專業技能開辦職類,培訓有準備的勞動力為基準點,且訓練師積 極與企業廠商、工會、學校接觸,開發專業技能與就業機會,務使所有開 辦訓練職類之受訓學員於結訓後均有就業機會。 二、近三年來,本局職訓中心不斷檢討調整訓練職類包括:電腦實務應用、資 料處理、網路資料庫、LINUX 入門、國際金融投資電腦實務、多媒體網 頁設計產品設計、飲料服務、西點蛋糕、風味小吃、汽車車身美容、中餐 烹調等,以滿足產業人力需求。 三、為因應國內外產業技術暨職業訓練發展方向及現況,本局職訓中心每一年 度均提供職業訓練師研習進修機會,以充實專業知識與技能,提昇專業倫 理素養,增進職業訓練成效,九十一年度共計辦理十二梯次,五十一位訓 練師參加,且本中心訓練師進修近三年來就讀碩士班八人、博士班一人、 大學部十人,對提昇自我與專業技能,均具極大效益。 四、另九十二年一月十五日完成「臺北市職業訓練職類發展策略」研究案,係 動員全體訓練師就各自專業領域,積極展開革新步調,以提振經營績效,
監察院公報【第2653 期】 ‧54‧ 使職業訓練的工作更能機動因應民眾需求,提昇訓練層次,以供民眾終身 學習與生涯訓練機會,並積極朝向靈活、彈性、多元等方向發展。 審核意見四 按勞委會表示,已訂定「職業訓練績效評鑑工作計畫」,並自九十一年八月起 陸續辦理評鑑工作,該評鑑結果與各訓練單位之施訓績效為何?又對於承辦單 位訓練成效缺乏評估部分,未見具體改善方案。 辦理說明 行政院勞委會: 一、為有效運用民間職業訓練資源,增加民間職業訓練力量與容量,本會於九 十一年七月八日訂定「職業訓練績效評鑑工作計畫」,透過職業訓練評鑑 制度,由所屬職訓中心彙同專家學者組成「職業訓練評鑑」評定訓練單位 之辦理績效,作為未來是否合辦、委辦及推介民眾參訓之依據,自九十一 年度陸續辦理評鑑,因評鑑項目涉及結訓學員四至六個月就業情形追蹤調 查,九十一年度評鑑結果預計於九十二年七月前完成。 二、受評單位評鑑結果將列為本會所屬職業訓練中心職業訓練採購及淘汰不良 訓練單位之依據,並將評鑑結果建置於本會「職業訓練資源網」提供參訓 者選訓之參考,造成市場良性競爭,以提昇民間之訓練品質。 行政院青輔會: 本會為評估培訓單位之績效,已採取下列做法: 一、訂定培訓單位品質管控總評估類別及指標項目,以評估訓練績效-評估類 別包括:課程計畫執行情形、行政配合度、學員就業輔導、學員滿意度等 四大項;此外,培訓期間由本會及專案協力群到各培訓單位做期中訪視, 結訓時,對參訓學員作問卷調查等,以上品質管控之做法均用來評估培訓 之成效。 二、以結訓學員就業輔導率做為撥款參考-培訓單位應追蹤學員結訓後三個月 之就業狀況,若各該班結訓學員平均就業率達二十五%者,得支領二十% 行政管理費;若各該班結訓學員平均就業率達四十%者,得支領三十%行 政管理費;若各該班學員平均就業率達五十%者,得支五十%行政管理費 ;若各該班結訓學員之平均就業率若未達二十五%時,則不予撥付五十% 行政管理費。此外,培訓就業績效亦作為未來徵求評選時之參據。 糾正事項三 職業訓練券之核發法源不足,且勞委會未訂定合理補助方式及建立監督及評鑑 制度,致不切合實際需要,績效不彰。 審核意見一 職業訓練券之施行僅以試辦要點予以規範,法源依據不足,請即儘速訂定法源 依據,始為正辦。 辦理說明 行政院勞委會: 為擴大運用民間訓練相關資源,增加就業保險被保險人及特定對象之失業者參 加職業訓練管道及配合就業保險法自九十二年一月一日起實施,將失業給付業 務、就業促進及職業訓練等措施以單一窗口作業方式提供民眾三合一服務,加 強辦理一般求職者、特定對象及請領失業給付者就業或職訓諮詢,促進職場供 需媒合,協助失業勞工儘速再就業及穩定就業,本會職訓局業於九十二年一月
監察院公報【第2653 期】 ‧55‧ 二日以職公字第○九二○○○二○○五B號函修訂「非自願性失業勞工及特定 對象職業訓練券試辦要點」為「職業訓練券實施計畫」,並自九十二年一月一 日起實施,納入三合一就業服務體系職業訓練措施之一環。 審核意見二 請說明九十一年度對職業訓練券持券學員參訓之訓練單位所進行之查訪時間、 情形結果及評鑑制度內容為何? 辦理說明 行政院勞委會: 一、九十一年度就業服務中心按月訪查辦理職業訓練券單位,依職業訓練券學 員參訓人數訓練情形,訪查項目包含職業訓練券學員出勤狀況、課程內容 、教師授課情形,如有學員申訴訓練單位之情形者則加強查察。 二、自九十二年一月一日起實施「職業訓練券實施計畫」,為確保訓練品質, 促進就業績效,已委託品質管控單位加強辦理下列訓練品質管控事項: (一)辦理訓練單位工作研習會:輔導並協助瞭解本計畫執行目標及相關應 配合事項。 (二)不定期訪視各該訓練班次:查核學員上課及教師授課情形、督導訓練 單位教務管理等相關事宜。 (三)受理學員申訴:針對學員申訴較多或不良反應之訓練單位,加強查核。 (四)以問卷方式全面辦理參訓學員滿意度調查,並督導訓練單位進行缺失 改善。 審核意見三 對於職業訓練券持券學員參訓結訓後,訓練單位應如何推介輔導就業,請說明 具體作法。 辦理說明 行政院勞委會: 一、本會訂頒「職業訓練券實施計畫」將依訓練單位輔導結訓學員就業績效, 支付訓練單位訓練費用,即學員結訓後一個月內,訓練單位如檢附結訓學 員就業證明文件且經核實無誤者,按實際參訓時數訓練費用全額支付訓練 單位;未檢附結訓學員就業證明或未就業者,則按實際參訓時數訓練費用 百分之九十支付訓練單位。另持券學員結訓後三個月,將依據本局開發之 「職業訓練績效評鑑實施準則」評鑑工具,對訓練單位辦訓績效,進行綜 合評鑑,作為下年度是否補助之參據。 二、訓練單位於學員結訓前,應與各廠商、企業界、可就業之單位團體等機構 聯繫,進行就業媒合及爭取就業機會,未能推介就業者應通報就服中心持 續推介或辦理失業給付。 審核意見四 勞委會未訂定職業訓練券之合理補助方式,致各職業訓練機構收費標準不一之 情形,未見檢討改善措施。 辦理說明 行政院勞委會: 本會訂頒「職業訓練券實施計畫」業已有改善措施,在計畫中已訂定「職業訓 練券各職類訓練費用補助金額標準表」補助上限,訓練單位提送之訓練計畫書 中,落實照顧經濟弱勢參訓之需求,包含經費需求,評選委員根據上限規定及 其經費合理性予以審核。
監察院公報【第2653 期】 ‧56‧ 糾正事項四 勞工保險失業給付尚乏詳細之評估與調查,致使預估與實際核付金額落差甚鉅 ,又失業給付期限未能與失業週數結合,未符需要,致效能不彰,顯欠允當。 審核意見一 按勞委會表示:對於落實投保薪資申報,除由勞保局加強對投保單位及被保險 人之宣導,該局及各區勞動檢查所亦積極進行查核,請說明積極改善之具體作 法、查核情形,及提出具體數據與改善績效。 辦理說明 勞工保險局: 一、勞工保險投保薪資為計算保險費及勞工領取保險給付之依據,其申報金額 的高低,直接影響到勞工領取保險給付之權益及勞保財務健全之基礎。依 照勞工保險條例第十四條及其施行細則第三十二條規定,勞工保險投保薪 資係採申報制度,各投保單位應主動依據所屬被保險人月薪資總額覈實申 報投保薪資。 二、本局體察到部分投保單位或被保險人平時將投保薪資以多報少,會造成被 保險人於突發保險事故時減少原應領取之現金給付金額,而在預期領取保 險給付前將投保薪資以少報多,則將嚴重影響到勞保財務的健全,基於確 保被保險人應有保險給付權益,減少勞資紛爭,及維護社會保險公平、正 義原則與維繫勞保業務永續經營,每年均將「加強辦理投保單位是否覈實 申報投保薪資之查核」列為重點工作。除透過廣播、電視、報章雜誌及戶 外電子看板等各種大眾傳播媒體,及舉辦各項勞保業務研討會,以動態與 靜態方式加強宣導及灌輸投保單位及被保險人覈實申報投保薪資等正確投 保觀念外,並採取下列各項查核投保薪資措施: (一)查核投保薪資以多報少部分: 1.加強投保薪資調整表之審核,大幅調降投保薪資須檢送薪資表佐證 方予受理。 2.運用財稅薪資所得資料與被保險人投保薪資比對,偏低較多者辦理 逕行調整提高。 3.針對申報投保薪資為一萬六千五百元以下被保險人作全面查核調整 ,偏低者逕行調整提高;另選擇高危險性事業單位申報投保薪資較 同行業平均投保薪資偏低者督促覈實調整。 4.依據勞動檢查所、稅捐稽徵單位函及民眾檢舉投保單位未覈實申報 投保薪資派員實地查核糾正。 (二)查核投保薪資以少報多部分: 1.被保險人於申領各項現金給付前大幅調整投保薪資,均經派員查證 ,如有不符規定者,除處以罰鍰外,並依規定更正投保薪資。 2.高齡勞工大幅申報調高投保薪資均先派員查核,符合規定始予受理。 三、謹就九十一年度(九十一年一月起至十二月底止)執行投保薪資查核成效 分述如下: (一)落實投保薪資調整表之審核,凡調整後投保薪資較調整前偏低甚多者 ,即退請投保單位檢附員工薪資資料再憑核處。如有不符規定申報者 ,該筆投保薪資調整不予受理,或按員工薪資逕予更正。經統計,本
監察院公報【第2653 期】 ‧57‧ 局九十一年度審核投保薪資調整表,計一百七十六萬餘人次。 (二)以財稅中心薪資所得資料與被保險人投保薪資比對查核,偏低甚多者 即依規定逕予調整提高。九十一年度共辦理三梯次投保薪資逕調作業 ,合計逕行調整五萬七千零三十四個投保單位,十四萬四千八百六十 七位被保險人,全年增加保險費收入共計約十億一千三百二十萬餘元。 (三)針對高危險性事業單位申報投保薪資較同一行業業別平均投保薪資偏 低者,辦理催辦調整投保薪資,逾期不為調整或調整後仍屬偏低者, 即逕行調整提高。九十一年度共查核三百零一個投保單位,計五千五 百一十二位被保險人,其中投保單位自行申報調整提高者計四十六個 ,投保單位寄送員工薪資表經本局審核為覈實申報者計二十七個,投 保單位已退保者計三個,未覈實申報或逾期未自行申報經本局逕行調 整提高者計二百二十五個,全年增加保險費收入計約一千九百七十一 萬七千餘元。 (四)運用台北市、高雄市政府勞工局、勞委會北、中、南勞動檢查所函送 檢查資料及勞工檢舉函等資料,派員查證,如有未覈實申報之情形, 即按員工實際薪資所得逕行調整。經統計,九十一年度查證不符合規 定者,計三千六百三十二人次,罰鍰金額達八百二十九萬二千餘元。 (五)加強查核高齡及領取現金給付之被保險人投保薪資調整,凡申報大幅 調整提高投保薪資者,均先函請本局辦事處查證,符合規定者,方予 受理。至職業工會、漁會之高齡被保險人申報大幅調高投保薪資者, 亦函請工、漁會檢附其薪資收入紀錄或報稅資料等具體證明資料送本 局辦理,符合規定者始予受理,以防杜巧取給付。經統計,九十一年 度實地訪查被保險人年逾五十八歲及請領現金給付前大幅調高投保薪 資之投保單位,共計查核二千三百二十五件,符合規定申報者計一千 四百一十四件,不符合規定者計九百一十一件,一千五百九十七人次 ,罰鍰金額達一千五百五十四萬九千餘元。 (六)凡經查核投保單位將被保險人投保薪資以多報少或以少報多者,均依 照勞工保險條例第七十二條第二項之規定:自事實發生之日起,按其 短報或多報之保險費金額,處以二倍罰鍰。勞工因此所受損失,由投 保單位賠償,以達嚇阻功效。 審核意見二 據勞委會指出:目前已訂定「勞工保險失業給付查核實施計畫」,以貫徹勞工 保險失業給付業務相關法令之執行,落實辦理失業認定事宜,請詳述其具體作 法及改進檢討情形。 辦理說明 勞工保險局: 一、本會勞保局成立查核小組,由副總經理擔任總召集人,各處室主管為查核 小組成員及訂定查核重點分設定條件篩選抽查及政風單位接獲檢舉等相關 工作。如查明屬實,除追回原領給付,並依法處以罰鍰移送法辦或取消投 保資格處理。又針對巧取給付部分,勞保局已列為宣導重點,利用各種管 道持續宣導,提醒被保險人勿因小失大以免觸法。
監察院公報【第2653 期】 ‧58‧ 二、篩選條件: (一)九十年度以後新成立之投保單位。 (二)投保人數五至三十人。 (三)投保薪資三萬元以上。 (四)該單位請領失業給付人數達投保人數1/2 以上。 (五)請領給付者中在該單位加保期間三個月以下者。 (六)排除勞字及訓字投保單位。 三、謹將九十一年度失業給付查核重點及辦理情形說明如下: (一)專案性查察:依各種條件篩選異常案件抽查約八十家投保單位,即移 請各辦事處專人實地訪查,是否確實符合失業給付請領條件再憑辦理 。查核結果其中一件屬自願離職,失業給付應不予給付,其餘均符合 失業給付請領條件。 (二)二次申請案件之查察:申請人已領滿六個月失業給付後,再次受僱滿 一年後非自願離職申請失業給付者,經篩選符合條件約四○○餘人, 因限於人員不足,決定抽查申請人又回同一個單位就業者計十四人, 查核結果其中一人不合規定收回已領失業給付、一人取消資格及一人 調降投保薪資收回溢領部份給付,其餘均確因不景氣而遭裁減申請失 業給付。 (三)檢舉案查察:本局政風室接獲民眾檢舉案約四十餘件,案經移請各辦 事處派員實地訪查是否巧取給付,查核結果發現五人確有工作收入均 依法收回原溢領之失業給付,一人離職原因不符失業給付請領條件, 除退回原領給付並處以二倍罰鍰、另一人未覈實申報投保薪資已依規 定處理,另某實業社因負責人已死亡無法取證追究離職原因,其餘均 符合失業給付請領規定,均准予給付。 審核意見三 又目前勞保失業給付期限為六個月,另「就業保險法」於九十二年一月一日施 行,失業勞工合併領取失業給付及職業訓練生活津貼計長達十二個月,對於如 何結合失業給付期限與失業週數之評估基準,未見相關說明。 辦理說明 行政院勞委會: 一、自八十八年開辦勞工保險失業給付、各公立就業服務機構受理失業給付申 請時,均依規定澈底執行,必要時向申請人、投保單位或勞工行政機關或 推介就業單位查察其離職事由、離職證明文件之取得程序,及未能接受推 介就業狀況等,職訓局彙整統計各公立就業服務機構有關離職證明以切結 方式提出申請之案件,對有異常情形者加強查核。執行後僅有少數零星不 合法令規定之申請案件,並無重大不法事件,執行成效良好。 二、針對「對於如何結合失業給付期限與失業週數之評估基準」一節,自民國 八十八年勞工保險失業給付開辦後,勞工團體、民意代表及有關各界迭有 反映適度擴大失業給付適用對象,且鑑於近年來失業率居高不下,為加強 保障勞工失業期間之基本生活,配合勞工平均失業週期,本會於八十八年 七月三十日及八十九年十二月三十日二次修正「勞工保險失業給付實施辦
監察院公報【第2653 期】 ‧59‧ 法」,其中失業給付標準從月平均投保薪資百分之五十,提高至百分之六 十。失業給付週數從繳納失業給付保險費未滿五年者,失業給付期限由三 個月延長為六個月並取消各階段及終生給付上限規定。由於近年來失業率 上升,故九十年度失業者平均失業期間為二十六點一週,九十一年一月份 為三十點四週。惟失業給付制度係考量台灣整體長期之經濟發展狀況,又 為防止失業勞工過度依賴失業給付,並激勵其迅速再就業,世界各國發放 失業給付之週數約五至三十週,故失業給付期限為六個月(計約二十六週 )尚屬妥適。 另就業保險法業於九十二年一月一日施行,為提昇勞工就業技能,促進就 業,保障勞工職業訓練及失業一定期間之基本生活,故失業勞工合併領取 失業給付及職業訓練生活津貼計可長達十二個月(約五十二週)。 審核意見四 另為建構完善之就業安全體系,結合就業諮詢、就業服務及職業訓練,制定「 就業保險法」,未來勞委會將結合政府相關部門及民間就業服務與職業訓練資 源,加強辦理就業諮詢與職業訓練部分,僅說明於就業保險應收保險費百分之 十範圍內提撥專款,作為辦理在職與失業勞工之職業訓練費用暨獎助雇主僱用 本國籍失業勞工,並未對政府相關部門及民間就業服務與職業訓練資源如何結 合作整體規劃及說明。 辦理說明 行政院勞委會: 一、本會結合經濟部工業區服務單一窗口代收本國人才招募資料,並將資料轉 介職訓局就業服務中心辦理,另有關較不易推介工作之求職者,經中心個 案管理員評估後,則轉至民間辦理深度就業諮詢。 二、本會訂定「行政院勞工委員會結合人民團體設立就業服務據點經費補助計 畫」,與民間團體合作辦理求職求才登記及推介就業服務。 三、本會結合民間訓練資源提供多元彈性的職業訓練措施如下: (一)結合民間訓練資源,於各縣市辦理在地化、社區化職業訓練。 (二)本會職訓局局屬六所職訓中心與事業單位合作辦理「訓用合一」職前 訓練。 (三)委託辦理資訊軟體及新興重點產業科技人才培訓工作,落實知識經濟 政策。 (四)擴大運用民間訓練相關資源,推動職訓券措施,提供彈性多元化參訓 方式。 糾正事項五 臨時工作津貼、創業貸款利息補貼及僱用獎助津貼之核發,成效不彰。 審核意見一 臨時工作津貼之目的係為紓緩及安定失業者失業期間之生活壓力,並協助及激 勵其迅速再就業,惟九十年臨時工作津貼實領人數比例偏低,該項津貼核發成 效顯然不彰,在我國失業率高居不下之情形下,未見提出具體有效檢討改善作 法,以充分發揮該項措施之效益。 辦理說明 行政院勞委會: 一、鑒於我國失業率偏高,本會除推動年度施政計畫外,並辦理永續就業工程
監察院公報【第2653 期】 ‧60‧ 、多元就業開發方案等各種專案型工作,另規劃結合民間團體辦理就業服 務,以開發就業機會、改善就業市場資訊等方式,紓緩失業率偏高之情形。 二、因年度推動之措施多元,如申請人申請臨時工作時,無適當臨時工作職缺 ,或申請人未符用人單位之需求,公立就服機構將依申請人就業能力及意 願,推介其他適合之專案型工作,或轉介其接受職業訓練,俟其加強就業 職能後,再推介其就業;故「臨時工作津貼」係為輔助性就業促進工具之 一,如僅以核發人數衡量辦理成效,將有失偏頗。臨時工作津貼之申領, 除適用對象資格條件之確認外,亦要求津貼申領人必須符合「就業促進津 貼實施要點」及「臨時工作津貼作業須知」相關規定,始發給津貼,九十 年「臨時工作津貼」申請人數計一二、二一七人,實領人數八、二一六人 ,約佔申請人數百分之六七.二五,核發金額計新臺幣一、二八九、四三 四、八二七元。 三、為使「臨時工作津貼」發揮就業促進之效能並符合法制,於九十一年十二 月三十日施行「就業促進津貼實施辦法」,針對「臨時工作津貼」開辦以 來未臻完備處,加以改進,除以提供臨時工作之方式紓緩失業者失業期間 之生活壓力,並於其從事臨時工作期間,提供有給求職假,以鼓勵其求職 面試,進而重返職場外,另加強津貼領取與就業促進之關聯,例如:該辦 法第十六條第四款規定,拒絕公立就服機構推介就業之津貼領取者,將停 止或不予給付津貼,第四十四條規定公立就服機構或職訓單位查核津貼執 行相關事宜;本會另督導各公立就服機構辦理津貼訪查計畫,以瞭解津貼 申領人就業情形等。惟失業率係國內外整體經濟、投資意願、產業發展等 因素交互影響之結果,失業率偏高並非勞委會職權所能完全涵蓋,失業問 題之緩解,仍有賴於整體經濟環境的改善。 審核意見二 對於失業勞工申請創業貸款案未能發揮效用部分,在尚未實施創業輔導團隊機 制前,有何具體改善方案?又創業輔導團隊機制之規劃情形及詳細內容為何? 未見說明。 辦理說明 行政院勞委會: 一、針對所提辦理之失業勞工創業貸款未能發揮效用一節,其主要問題為本會 辦理之創業貸款,其貸款本金均由銀行出資,而銀行為確保其債權,均要 求申請人提供定額之擔保品或信用保證等,惟申請創業貸款之失業勞工大 多屬經濟上弱勢,故無法提供擔保品或信用保證,致銀行核貸意願不高。 據此,本會曾於經建會一一一一次委員會中提議並獲致結論:由經建會邀 集勞委會、農委會及青輔會等相關機關檢討目前執行情況及貸款條件,尤 其是勞工相關貸款宜儘速檢討整併,以發揮實質效果。經建會並於九十二 年八月一日召開會議獲致決議,將「失業勞工創業貸款」、「身心障礙創 業貸款」及「災區失業勞工創業貸款」四十五歲以上之申請者轉介至微型 企業創業貸款,對於四十五歲以下之申請者則可轉介至青年創業貸款,以 便整合政府相關資源,使創業勞工得到信用保證基金保證之機會,促進勞 工創業貸款績效。
監察院公報【第2653 期】 ‧61‧ 二、創業輔導團之運作機制如下: (一)目標:本會為結合民間資源,強化創業輔導機制,業訂定「行政院勞 工委員會職業訓練局創業諮詢輔導團實施計畫」,以開拓多元化就業 管道,紓緩失業趨勢。期透過創業諮詢服務,提供失業者創業相關訊 息,並辦理創業諮詢研習活動,發揮創業服務效能。 (二)辦理方式:本項業務係以委外方式,依政府採購法程序評選得標廠商 辦理。 三、創業諮詢服務流程: (一)成立「創業諮詢輔導團」。 (二)民眾經公立就業服務機構就業諮詢後,評估其能力與意願後,篩選有 創業諮詢必要者,轉介創業諮詢輔導團輔導機制,進行一對一之個案 輔導或現場診斷輔導。 (三)個案參加創業相關研習活動,以協助其了解創業相關訊息與創業意願。 (四)經「創業諮詢輔導團」創業諮詢結案後,承辦單位應將結案報告及相 關輔導紀錄,提供原轉介之就業服務中心。如結案後仍需就業服務者 ,則由就服中心辦理後續就業服務工作。 (五)「創業諮詢輔導團」創業諮詢服務結案後,承辦單位將針對個案至少 追蹤輔導三個月。 台北市政府勞工局: 有關對於失業勞工申請創業貸款案未能發揮效用部分,本局就業服務中心辦理 情形如下: 本局就業服務中心為避免民眾在經濟不景氣情況下冒然投資創業,一旦創業不 成反而造成家庭及社會問題,為提高民眾創業成功機率,九十一年度針對特定 對象及失業勞工訂有創業輔導實施計畫,計畫內容如下: 一、編印創業輔導手冊:將創業可能面臨的問題加以彙整,提供有意創業之民 眾參考。 二、創業研習班:研習課程包括聘請專家針對商場現況及趨勢加以分析解說; 如何參加連鎖加盟經營;政府現行各項創業貸款利息補貼措施等。 三、創業適性評量:參加創業研習班後,由各就業服務站針對個別有意創業者 個人所具備之條件作簡易創業適性評量,供創業者參考。 四、創業諮詢:將創業諮詢服務業務委外辦理,安排創業者一對一創業諮詢服 務,協助民眾創業。 五、創業後巡迴諮詢服務:經協助民眾創業後,由委外之創業諮詢人員至創業 者創業場所實地訪查,並提供經營上之實務建議,供創業者參考。 六、計畫執行情形:九十一年共計辦理六場創業研習班,參加研習人數共三九 九人,提供創業諮詢人數為三十二人,創業諮詢時數共八十小時。 審核意見三 有關僱用獎助津貼核發欠缺稽核制度部分,請說明九十一年進行訪查日期、情 形與結果。又就業促進津貼辦法,對於雇主假非自願性失業勞工之名,行詐領 僱用獎助津貼之情形,有何相關規範措施?
監察院公報【第2653 期】 ‧62‧ 辦理說明 行政院勞委會: 一、為查核公立就業服務中心實施就業促進津貼情形,於九十一年八月十五日 函請各就業服務中心針對申領者進行不定期訪查,並將訪查情形按月回報 本局。自九十一年九月至九十二年三月,已累計查訪一、五○四人次,其 中僱用獎助津貼計八○八人次。 二、為防杜雇主假非自願性失業勞工之名,行詐領僱用獎助津貼之情形,本會 採行措施如下: (一)依據九十二年一月一日施行之「就業促進津貼實施辦法」規定,雇主 需先向公立就業服務機構辦理求才登記,並於二個月內僱用公立就業 服務機構或指定單位所推介之人員,於連續僱用滿六個月才可提出僱 用獎助津貼申請。因雇主所僱用人員,需由公立就業服務機構或指定 單位所推介之就業弱勢者,且其需經公立就業服務機構辦理求職登記 及就業諮詢等程序,故可避免雇主假非自願性失業勞工之名不實領取 僱用獎助津貼。 (二)本會於九十二年四月八日訂定「就業促進津貼查核計畫」,將僱用獎 助津貼列為主要查核項目,並針對公立就業服務機構所推介可申領僱 用獎助津貼者是否屬就業弱勢、公立就業服務機構資料建置情形等加 強查核,及優先查核申請僱用獎助人數超過三十人以上之雇主等,以 落實查核目的。 (三)另本會於九十二年五月七日訂定「就業促進津貼實施辦法」及「雇主 僱用失業者獎助辦法」標準化作業流程,以落實公立就業服務機構依 據標準作業流程核發津貼。 台北市政府勞工局: 本局就業服務中心為防杜不實申領僱用獎助津貼,訂有「臺北市政府勞工局就 業服務中心訪查僱用獎助津貼事業單位注意事項」,九十一年度共計訪查九家 事業單位,除一家事業單位發給工資未達規定,經糾正補發外,並無不實申領 或違反僱用獎助津貼規定情事者。 高雄市政府: 有關僱用獎助津貼之核發本府勞工局訓練就業中心均係依「就業促進津貼實施 要點」及「就業促進津貼實施辦法」之規定來核發,並自九十一年度起,不定 期針對請領津貼之雇主及求職者,採電話及親自訪查等方式進行查訪,以防止 雇主詐領情事發生,九十一年度計核發六四九人次,核發金額二六、○八五、 ○○○元。 糾正事項六 資遣通報制度未能有效落實,相關主管機關執法不力,顯有疏失。 審核意見一 對於資遣通報制度相關主管機關應如何落實執行?未見積極改善措施,請說明 相關法規、具體改進及檢討情形與九十一年度實施成效。 辦理說明 行政院勞委會: 一、九十一年度辦理資遣通報之事業單位計四一、七四七人。 二、就業服務法第三十三條規定,雇主資遣員工時,應於員工離職之十日前列
監察院公報【第2653 期】 ‧63‧ 冊通報當地主管機關及公立就業服務機構。 三、各地重大勞資爭議資遣案件,常有雇主為免勞資爭議擴大,未向各公立就 業服務機構辦理通報之情事,但各就業服務機構均能主動與當地縣(市) 政府聯絡,取得被資遣員工資料,並派員前往資遣員工之事業單位講解說 明,提供政府促進就業相關資訊與提供必要服務。 四、本會職訓局業已於九十二年六月十二日函請各縣(市)政府加強宣導執行 ,並針對九十一年度執行情形提供改善措施。 台北市政府勞工局: 一、本局於八十九年起建立「資遣通報線上申辦系統」,除提供事業單位以網 際網路直接辦理資遣通報外,本系統亦將事業單位提報之資遣勞工資料依 其通訊地址直接分送至職訓局各區就業服務中心及本局就業服務中心之聯 絡對口以立即提供就業服務。本系統之建置,除服務之立即性外,亦可縮 短事業單位之通報時間及減少紙本公文等例行庶務業務。 二、建立查核機制,對違法者開立罰鍰處分書,嚴格執行法令規定:將勞資爭 議案件或勞動檢查結果與資遣通報失業勞工資料庫持續進行交查作業,發 現未依法通報之事業單位,將從嚴處罰。 三、本局製作事業單位資遣通報義務之宣導DM,分送本府建設局、本局勞動 檢查處、就業服務中心及職業訓練中心等單位加強宣導。
行政院 函 發文日期:中華民國93 年4 月29 日 發文字號:院臺勞字第0930017985 號
主旨:貴院函,為本院函復,貴院前糾正政 府未能有效整合公、私立就業服務機 構體系,造成就業輔導業務事權不一 ,致就業服務績效不彰,且職業訓練 欠缺完整體系及評鑑機制,影響訓練 成效。又勞工保險失業給付,尚乏詳 細之評估與調查,導致預估與實際核 付金額落差甚鉅及臨時工作津貼、創 業貸款利息補貼、僱用獎助津貼之核 發,成效不彰,資遣通報制度未能落 實執行,均有未當案之處理情形,檢 附貴院審核意見,囑轉促所屬檢討改 進見復一案,經交據本院勞委會會商 本院青輔會、本院退輔會、本院農委 會、本院研考會、台北市政府及高雄 市政府等有關機關函報檢討改善情形 ,並經酌整,尚屬實情,復請 查照。 說明: 一、復貴院九十三年二月十一日(九三) 院台財字第○九三二二○○一三○號 函。 二、檢附本案之檢討改善情形一份。 院長 游錫堃
本案之檢討改善情形 糾正事項一 我國就業輔導事權不一,就業服務機構未能有效整合公私、立就業服務機構體 系,且人力及專業性不足,致就業服務績效不彰
監察院公報【第2653 期】 ‧64‧ 前次審核 意見一 有關就業輔導事權不統一之改進措施,及勞委會正依「就業服務法」規定研修 「公立就業服務機構設置準則」,據以明確規範中央與地方公立就業機構之職 掌與權責部分,相關主管機關未說明目前修正方向及內容,與「公立就業服務 機構設置準則」之研修進度與情形。 審核意見 勞委會已研修「公立就業服務機構設置準則」報行政院於九十二年六月三十日 准予修正核定,該會於九十二年七月十四日發布施行;對於我國就業輔導事權 不統一部分,行政院在九十一年四月函送立法院審議之「行政院組織法」修正 草案中,規劃設置「勞動及人力資源部」,在合理的範圍內統一就業輔導事權 ,以避免職掌重疊;有關就業服務之事權統一與資源整合議題業已納入行政院 組織改造「厚生勞動工作圈」通盤檢討中,顯見已有具體研修方向,惟針對就 業服務之事權統一與資源整合乙節,仍請詳為說明具體進度與情形。 辦理情形 說明 勞委會說明: 一、行政院組織改造「厚生勞動工作圈」,以職能檢討為重點,就各區塊業務 進行四化檢討(去任務化、地方化、法人化、委外辦理),經詳細研討後 ,其中有關「就業服務類」區塊業務之檢討結果及建議如下: (一)本會部分:失業認定、推介求職、求才及媒合、各項就業促進津貼、 辦理身心障礙者職務再設計及就業輔具補助;辦理身心障礙者職業輔 導評量工作及推動身心障礙者就業服務等,列為機關保留。 (二)青輔會:辦理專上青年生涯輔導工作及辦理專上青年就業服務之業務 ,列為併入本會(俟組織再造時,與本會職訓局相關業務整併,專上 青年求才求職網站將去任務化,併入本會全國就業資訊網)。 (三)退輔會:退除役官兵就業輔導之業務,列為機關保留(退除役官兵背 景特殊,為使其順利融入社會,須有專責機構負責給予協助輔導,有 其特殊需要與不可替代性。)。 「厚生勞動工作圈」所提上開建議,現正由行政院組織改造推動委員會審 查中。 二、本會將配合行政院研考會所推行之電子化政府共通作業平台,以單一網站 窗口提供便民之服務。行政院研考會委託財團法人資訊工業策進會規劃「 觀光行程暨預約服務」、「政府求才服務」、「戶政資料登記與變更服務 」、「智慧型掛號暨保險服務」等四項創新e化服務重點。其中「政府求 才服務」係有關整合國內相關部會之求職求才資料庫,並將本會及青輔會 共同列為該項服務之主辦機關,確立本會協調其他機關之正當性。故於「 行政院組織法」修正草案完成立法前,本會職訓局期能透過行政院研考會 規劃之「電子化政府共通作業平台-政府求才服務」,有效整合本會、青 輔會、退輔會、人事行政局、銓敘部、教育部、經濟部投資事業處、商業 司、財政部賦稅署等國內相關部會及各縣(市)政府之求職求才資料庫。 三、至於人力與專業性部分,亦透過「三合一就服作業流程」之規劃實施,及 就服專業人力勞務外包等進用專業人員,進行各項專業訓練,以建立專業 化、資訊化、全人化等目標,並獲得「金斧獎」。
監察院公報【第2653 期】 ‧65‧ 前次審核 意見二 據函復檢討改進情形表示:「目前公立就業服務中心針對就業諮商、就業促進 研習等就業專業服務委外辦理,同時將規劃由民間參與就業推介媒合,以提昇 私立就業服務機構之專業。」未見相關改進措施及規劃作業情形;另對於我國 就業服務機構未能有效整合公私立就業服務機構體系部分,亦未見相關具體措 施。 審核意見 據勞委會說明,已訂定「行政院勞工委員會結合人民團體設立就業服務據點經 費補助計畫」並推動「就業推介媒合津貼」業務;青輔會表示已結合教育部、 勞委會共同進行大專畢業青年生涯發展意向調查與畢業生就業追蹤調查;輔導 會表示,將網路求職求才系統委託一○四人力銀行設置管理與維護,並與「台 灣加盟促進協會」、「中華民國生涯成長協會」合作辦理相關事宜;另外台北 市政府勞工局訂有「台北市結合勞資團體拓展就業服務網絡實施計畫」及「台 北市結合人力供應業拓展就業服務網絡計畫」;高雄市政府則委外就業促進研 習活動及深度就業諮詢業務。綜上所述,我國就業服務機構,係各自推動相關 措施,仍未能有效整合公、私立就業服務機構體系,仍請檢討見復。 辦理情形 說明 勞委會說明: 依就業服務法第三十三條之一,本會得將其於該法所定之就業服務及促進就業 掌理事項,委任所屬就業服務機構或職訓機構、委辦直轄市、縣(市)主管機 關或委託相關機關(構)團體辦理之。另為執行經發會決議,鼓勵民間參與投 入就業服務,故各主管機關得依其職權,配合其地域性需要與人力資源狀況, 因應其各成立宗旨與服務對象之特性,運用民間團體之彈性與活力,協助共同 推動就業服務。故我國就業服務機構整合運用轄區資源,已以其區域運籌角色 與職能,有效落實區域產經特色所需人才推介與媒合目標。 青輔會說明: 私立就業服務體系有營利考量,難以強制其釋出資源。本會以部分業務合作或 委辦方式與其有效結合。 退輔會說明: 本會辦理榮民就業輔導為機關之法定責任,配合國家就業政策與考量榮民需求 ,辦理就業服務相關工作,為機關之必須作為;因此本會與勞委會、青輔會, 彼此分工推動相關措施,服務法定對象,機構間相輔相成,聯繫順暢,合作無 間。 前次審核 意見三 據行政院表示:我國公立就業服務機構所掌握之就業機會較具公信力與安全性 ,且對身心障礙等特定對象之就業服務,係一般民間與其他管道所無法提供, 故其利用率不高與其他國家均大同小異。請提出其他國家之具體數據,並請說 明改進措施之具體績效評估指標及改善結果。 審核意見 據勞委會說明:行政院表示:全國各公立就業服務中心及站,已開辦結合失業 給付、就業服務與職業訓練三合一就業服務,求才利用率與日本差異不大,又 該會業開辦官方求職網站-全國就業e網,惟對於上開各項改進措施之具體成 果,如:求才利用率、失業給付、就業服務與職業訓練三合一就業服務成效, 仍請詳為說明改善結果。
監察院公報【第2653 期】 ‧66‧ 辦理情形 說明 勞委會說明: 一、依據行政院主計處國情統計通報資料顯示,失業率已由九十一年之五.一 七%下降至九十二年的四.九九%(至九十三年一月止更已下降為四.五 三%),失業民眾向政府就業服務機構求職者所占之比例由九十一年的九 %上升至九十二年的一七.六%(九十二年一月至九十三年一月平均)。 另公立就服機構九十二年之求職人數亦比九十一年度增加了七、五○六人 、求才人數增加了二四八、八五八人、推介求職人數增加五一六人。此外 ,「全國就業e網」自九十二年六月開站以來,平均每月首頁瀏覽人次更 已高達二五、○○○人次,可見在宣傳本會專業形象之下,求職者已逐漸 瞭解透過公立就服機構可獲得專業、優質的就業服務。 二、本會職業訓練局自九十二年一月一日就業保險法實施後,將失業給付、職 業訓練、就業服務等配套措施緊密結合,以建構完善就業安全體制。九十 二年度計核付失業給付三十二萬五、三四○件,新台幣五十四億五、八七 三萬四、二六四元。較九十一年度核付六十萬一、六四○件,新台幣一百 零一億零四一一萬九、六○二元,計減少約一半數量。 三、為加強積極促進失業者就業,針對所屬公立就業服務機構對於領滿六個月 失業給付者屆滿兩個月之後續就業情形按月定期追蹤輔導,九十二年一月 至十二月追蹤輔導者為九十一年五月至九十二年四月初次申請失業給付者 ,共計四○、○七○人,其中電話取得聯繫者二六、五八六人中已就業者 九、五八六人,自行創業者五七○人,參加職訓者二四二人,無就業意願 者一、六二八人,而尚未就業者一四、○五七人,另有六二五人為在家養 病、服役等其他原因。 四、前開尚未就業之一四、○五七人中,願意繼續接受就業服務者為一○、五 八七人,不願意繼續接受就業服務者為二、四一七人,另有一、○五三人 為出國、生病、死亡等其他原因。其中願意繼續接受就業服務之一○、五 八七人中,有四、五八九人經聯繫後,並未再回公立就業服務機構報到接 受服務;至於回機構報到接受服務者,有九八五人已被成功推介就業,三 六一人安排接受職業訓練諮詢,六三人安排參加職業訓練,二六人被轉介 至社會福利機構,其他原因(過完年再就業、到櫃台報到後又表示不願意 去就業等)者一、一三五人,另有三、四二八人目前暫無適當工作可資推 介,由公立就業服務機構建檔持續輔導中。因此,扣除前開較難推介之三 、四二八人後,在二、五七○人中透過積極協助得以適當安置比率達五五 .八四%。 高雄市政府說明: 本府勞工局訓練就業中心就業服務流程具體改善成效情形 項目 三合一就業服務流程 職訓券推介人數 安置就業率 就業人數 求才利用率 改善流程前 (91 年) 110 人 12.75% 3802 人 14.41%
監察院公報【第2653 期】 ‧67‧
改善流程後 (92 年) 190 人 18.73% 4416 人 15.26% 上述各項數據資料顯示,三合一就業服務流程已確實提昇就業服務績效。 前次審核 意見四 對於公立就業服務機構人力及專業性不足部分,未見如何再強化人力專業性之 具體改善方案。 審核意見 對於公立就業服務機構人力及專業性不足部分,勞委會將訂定「就業服務相關 工作勞務需求計畫」、將採取與民間事業機構策略聯盟方式,鼓勵民間參與投 入就業服務工作、結合民間團體辦理相關工作;青輔會刻正研究將就業服務網 站與行政業務分離,以投入專業人力、進行專案管理方式辦理;輔導會俟行政 院組織法修正通過後,再配合調整;台北市政府勞工局經由勞務外包派遣專業 人力協助提供就業服務;高雄市政府則是經常選送人員參加相關之訓練課程, 以充實其專業知能。顯見目前相關機關對於如何再強化人力專業性之具體改善 方案,係各自分離,未見整合,仍請行政院督促所屬檢討見復。 辦理情形 說明 勞委會說明: 一、依據就業服務法第八條規定:「主管機關為增進就業服務工作人員之專業 知識及工作效能,應定期舉辦在職訓練。」本會職訓局為促進公立就服機 構人員對當前暨未來就業服務政策改革走向及就業服務工作模式之了解, 同時建立相互合作之聯繫管道,進而運用就業服務相關資源,提升就業服 務功效,採取在職研習方式,增進在職人員之新知,九十二年度共辦理三 梯次公立就服機構人力培訓計畫,參訓人員各梯次約一二○人至一五○人 ,總計約三六○人至四五○人,可獲得公務人員學習護照認證許可。學習 方式分為以下二類: (一)第一類研習:三天二夜,分二梯次辦理。採專題講授、情境研討、心 得分享、分組討論、及綜合座談方式進行,參訓對象為公立就服中心 辦理就業服務非主管人員。 (二)第二類研習:一天一梯次,採專題講授及座談方式進行,參訓對象為 民間團體、就服相關機構人員。 九十三年度公私立就服機構人力培訓計畫將持續進行,以提昇就業相關新 知,及強化就業服務的品質。 二、本會職訓局有系統培訓公立就服機構人力的專業能力,於九十二年度分別 委託完成「就業促進員教育訓練課程與實施方式」及「就業諮詢服務人員 訓練規劃」二項計畫。上開兩項計畫研究成果如下: (一)公立就服機構人員工作職掌: 1.就業諮詢員:個案管理、職業能力評估、職業興趣探索、推介就業 規劃、就業促進研習活動、社會工作技術等。 2.就業促進員:辦理就業服務、就業機會開發、工作推介媒合、雇主 求才服務、公共服務擴大就業、多元就業開發方案等。
監察院公報【第2653 期】 ‧68‧ (二)課程內容依各類工作人員之工作特性與需求歸類成系統性、完整性及 整合性的課程大綱。以通識性及專業性為二大主軸,邀請專家學者研 討課程方向及內容之適當性,並依不同職別安排相當之訓練課程,明 確定位課程的需求性,以符合訓練安排的需求。 三、九十三年度本會職訓局將依上開研究之訓練模式,並視經費需求及民間參 與(大學或技術學院等)的狀況,來決定採獨立開班或補助學分費用方式 辦理進行。 四、預期成效:藉此訓練課程的整合歸納,有系統訓練公立就服機構人員工作 實務上的需求,改善其專業知能,並逐年檢討實施成效,以全面性提升公 立就服機構人力素質,俾提供更專業之服務。 青輔會說明: 本會將規劃對於各大專校院就業輔導工作人員增強專業職能。 退輔會說明: 本會為強化就業服務人員專業知識,提昇就業服務品質,每年除自行辦理「就 業服務人員專業訓練」外,另亦派員參加勞委會所舉辦之就業服務專業訓練, 交換工作經驗、瞭解國家就業政策與增進專業知能。 前次審核 意見五 有關公立就業服務機構行政作業程序緩慢部分,勞委會已完成網際網路就業資 訊系統之招標作業,預計九十二年一月建置完成,目前執行情形為何?又該項 措施對於提高雇主使用公立就業服務機構服務之意願及效能有何助益?並比較 說明公立就業服務機構有關行政作業程序,原有及修正改進情形如何? 審核意見 勞委會已說明該會職訓局之全國就業e網於九十二年六月三日開站,截至九十 二年六月底止,上網登記求職經推介成功就業者計一、○九四人,求才廠商找 到所需人才者計八四九人。惟對於該項措施提高雇主使用公立就業服務機構服 務之意願及效能有何助益?及如何加強求職民眾與廠商之結合,仍請具體說明。 辦理情形 說明 勞委會說明: 一、全國就業e網自九十二年六月開站,雇主於公立就服機構或自行於全國就 業e網登錄公司基本資料後,即可使用就業e網所提供之登錄、查詢與媒 合人才之免費最即時求才服務。 二、求職求才者可於就服機構或全國就業e網登錄求職求才履歷表,系統均會 根據所設定之喜好工作條件或人才,自動進行工作媒合服務,並透過語音 系統通知相關求職求才訊息,全國e網客服人員也會定期提供關懷服務, 期使兩者都能順利找到理想工作或人才。 糾正事項二 我國職業訓練欠缺完整體系及評鑑機制,且施訓對象與訓練職種未能結合,致 無法符合就業市場需要,影響訓練成效。 前次審核 意見一 行政院對於我國職業訓練機構分屬勞委會、退輔會、農委會等八個不同主管機 關、財團法人,造成訓練中心各自為政,訓練體系缺乏完整體系之情形,未有 具體改善。 審核意見 據行政院研考會說明:行政院組織改造推動委員會下設政府民間夥伴小組、中
監察院公報【第2653 期】 ‧69‧ 央地方夥伴小組、中央行政機關功能調整小組三個功能調整及經費、人事、法 制三個配套機制小組,將以職能檢討為重點,研議各訓練體系是否可由民間或 地方自治團體辦理;勞委會表示:已著手重建公共職訓體系,並將隸屬各行政 機關之公訓機構,納為各區域訓練資源提供者,未來將訓練業務及對象性質相 同之青輔會青年職訓中心改隸該會;青輔會辦理職業訓練係以公開招標方式辦 理訓練;輔導會表示與勞委會、青輔會等體系充分配合;農委會則對於農漁民 轉業訓練,由勞委會公共職業訓練及就業服務機構規劃辦理。綜上,行政院對 於我國職業訓練機構分屬勞委會、退輔會、農委會等八個不同主管機關、財團 法人,目前訓練中心仍係各自為政,缺乏完整體系,未有具體改善方案。 辦理情形 說明 勞委會說明: 一、行政院組織改造「厚生勞動工作圈」以職能檢討為重點,就各區塊業務進 行四化檢討(去任務化、地方化、法人化、委外辦理),其中有關「職業 訓練機構」區塊業務之檢討結果及建議如下: (一)本會職訓局所屬泰山職訓中心等六所職訓中心,列為機關保留。 (二)青輔會青年職訓中心,建議併入勞委會。 (三)退輔會訓練中心,列為機關保留。 上開建議處理方式,現正由行政院組織改造推動委員會審查中。 二、隨近年來科技革新、產業轉型及勞動力結構變遷,結構性失業問題日趨嚴 重,原公訓機構所扮演功能,無法滿足各界需求,因此,為期快速整合政 府有限資源,全力投入失業者職業訓練,本會職訓局以「行政革新」措施 積極重建公共職訓體系,將該局所屬職訓中心從單純的「職業訓練提供者 」,轉換為「區域職業訓練運籌中心」,扮演各區域公、私部門訓練資源 之規劃者、整合協調者之角色,以建構完整職訓體系為初期目標。 青輔會說明: 本會辦理大專畢業青年專長培訓係以公開招標方式,對外徵求大專校院、專業 訓練機構、財團法人及社團法人等單位,經評選後委託優勝單位辦理訓練。並 於徵求培訓單位時,要求各培訓單位提出就業市場需求之調查報告,其用意即 在加強落實「訓用合一」,增進訓練成效,使專上人力能充分運用。 退輔會說明: 本會辦理退除役官兵職業訓練及就業輔導為法定責任,並以中高齡退除役軍人 為主要訓練對象,具有特殊與不可替代性,本會訓練中心在職業訓練、技能檢 定、就業服務之政策上,係接受勞委會職訓局指導或業者委託,依循國家政策 辦理,機構間相輔相成,並無本位主義現象。 農委會說明: (一)有關農漁民離農轉業訓練,依據本會與貴會九十年十月二十六日會銜 訂頒「加強辦理農(漁)民轉業及第二專長職業訓練實施計畫」,本 會每年透過各縣(市)政府所規劃之農漁民第二專長訓練,均參考勞 委會公共職訓體系之訓練項目,考量可以結合農業產業轉型為農業休 閒或服務事業等項目,或考量漁民生活習性及能就近參加訓練,以彌
監察院公報【第2653 期】 ‧70‧ 補公共職訓機構之不足,對於協助農民儲備農業第二專長及以兼業方 式增加家庭收入均有幫助。 (二)為協助農漁民參加第二專長訓練並取得職業證照,以增加就業能力與 機會,凡設有國家職業證照之考試,訓練課程均涵括證照考試學科與 術科,通過者核發獎勵金,以資鼓勵;本會正規劃就通過證照考試學 員之就業情形辦理調查。 (三)各縣(市)政府所規劃之農漁民第二專長訓練,係委由職業學校、公 共職訓中心或農會辦理,各訓練單位均依課程內容,聘請學校老師或 具備資格之專業教師任教,確達訓練效果。 (四)另本會漁業署遠洋漁業開發中心原為行政院農業委員會漁業幹部船員 訓練中心,於八十七年本會漁業署成立時已整併為漁業署之內部單位 ,目前本會漁業署遠洋漁業開發中心之職掌,除訓練外,尚負有漁業 資源之研究開發、調查評估及推廣工作等任務。於公共職訓機構訓練 體系完成整合前,本會漁業署已積極將漁船船員訓練業務依區域漁民 訓練需求,逐步委託當地專業學術機構辦理。 前次審核 意見三 對於訓練師資專長及現有員額不足、訓練對象與訓練職類未能結合部分,未提 出具體改善措施。 審核意見 據勞委會表示僅係配合職訓中心角色功能調整,辦理職訓師轉型訓練;輔導會 說明為訓練對象大致與訓練職類結合;台北市政府勞工局說明,九十二年一月 十五日完成「臺北市職業訓練職類發展策略」研究案,動員全體訓練師就各自 專業領域,積極展開革新步調。惟對於政府各訓練機關訓練師資專長及現有員 額不足、訓練對象與訓練職類未能結合,仍未具體整合,研提具體改善措施。 辦理情形 說明 勞委會說明: 一、配合職訓中心改造,施予系統之職訓師轉型進修訓練;將職訓師轉型工作 區分為訓練規劃與管理師,及職業訓練諮商師兩大職務訓練,使職訓師能 習得因應組織變革並擔任新工作之專業知能。而現有職訓師繼續擔任核心 職類訓練職務者,則激勵參與大專院校修習學分班、推動國外進修及學術 研討等,以強化職訓師核心職業訓練能力,並輔以師資遴聘辦法升等(級 )規定提昇進修動能。 二、現有員額不足部分,本會職訓局六所職訓中心預算員額經行政院九十一年 八月三十日院授人力字第○九一○○二九八四八八號函核定為「現有員額 除主任外,均出缺不補」後,中心員額由九十年度五二六人,截至九十二 年止,現有人員數僅有四一九人,預計九十三年度將有四十二人提出退休 申請。面臨人員不足之嚴峻考驗下,本局仍積極運用現有人力進行職訓中 心區域職業訓練運籌角色轉型,以提升職業訓練品質與擴大辦理職業訓練 ;同時為因應訓練業務需求,已研提區域職業訓練運籌中心轉型計畫報行 政院,以爭取員額解凍限制。 三、為使適訓者參與適性職業訓練,本會職訓局所屬六所職訓中心蒐集服務轄
監察院公報【第2653 期】 ‧71‧ 區產業結構發展、就業市場及訓練資源供給現況,研提「台灣地區區域職 業訓練需求評估報告」,以作為辦理職業訓練之參據,且因應就業保險法 九十二年一月一日施行,擴大辦理職業訓練諮詢;推介失業者參加適性職 業訓練,九十一年計推介失業勞工九三三人次參加職業訓練,九十二年推 介失業勞工八、七六九人次參加職業訓練。 台北市政府勞工局說明: 一、本府勞工局職業訓練中心自九十二年度起,在本府勞工局政策採訓用合一 模式指示下,所有訓練職類之開辦需參考就業市場人力需求,先開發就業 機會,再依企業主所需專業技能開辦職類,培訓有準備的勞動力為基準點 ,且訓練師積極與企業廠商、工會、學校接觸,開發專業技能與就業機會 ,務使所有開辦訓練職類之受訓學員於結訓後均有就業機會。 二、近三年來,本府勞工局職業訓練中心不斷檢討調整訓練職類包括:電腦實 務應用、資料處理、網路資料庫、LINUX 入門、國際金融投資電腦實務、 多媒體網頁設計產品設計、飲料服務、西點蛋糕、風味小吃、汽車車身美 容、中餐烹調等,以滿足產業人力需求。近二年(九十一、九十二年)日 間訓練人數計三、七七四人,夜間訓練人數計三、五○五人,合計七、二 七九人;就業率九十一年達五四.二%,九十二年達七七.三%;在委辦 訓練方面,九十一年度中央以就業安定基金補助各縣(市)政府辦理特定 對象職業訓練計有水電裝修實務班等十五職類,結訓三七二人,三個月後 輔導就業率五五%;九十二年度辦理計有美容實務班等二十二職類,結訓 五七六人。 三、本府勞工局職業訓練中心有關職類調整之實施績效如下: (一)辦理學員職場適應訓練作業,為期受訓學員能在最短時間內習得職場 需要之工作技能,迅速投入就業市場,提昇受訓學員就業率,嘗試與 企業界配合實施學員職場適應訓練;新進學員進入本府勞工局職業訓 練中心先習得並具備職場所需基本工作技能後,再到業界進行職場適 應訓練,其訓練期間由本府勞工局職業訓練中心及業界視實際訓練及 情況作彈性增減。本項試辦措施有利於業界聘僱本府勞工局職業訓練 中心受訓學員(例如:汽車綜合修護及機車修護職科)。 (二)與企業主合作辦理職業訓練,即配合「選、訓、照、用」合一政策推 動,於開辦前規劃作業時,先與企業主懇談,以獲取工作機會並商議 訓練課程及時數,由本府勞工局職業訓練中心訓練師及業界從業人員 共同擔任授課。此種量身打造之技術人才訓練,係考量訓練及就業之 緊密結合,採合作夥伴,保證就業方向規劃(例如:車用電子職科)。 四、為因應國內外產業技術暨職業訓練發展方向及現況,本府勞工局職業訓練 中心每一年度均提供職業訓練師研習進修機會,以充實專業知識與技能, 提昇專業倫理素養,增進職業訓練成效,九十二年度共計十七位訓練師參 加,另泰山職訓中心辦理之職訓師轉型訓練,本府勞工局職業訓練中心訓 練師共計三十九位訓練師參加;且本府勞工局職業訓練中心訓練師進修近
監察院公報【第2653 期】 ‧72‧ 三年來就讀研究所五十二人、大專部四十人、空大十人,對提昇自我與專 業技能,均具極大效益。 高雄市政府說明: 本府勞工局訓練就業中心訓練師員額不足及訓練經費缺乏,無法更新訓練職類 ,為因應市場需要,已委託學者針對缺失進行專題研究,初步構想朝運用社會 資源與民間社團、協會、工會等單位合作辦理就業市場急需職類之職業訓練, 本中心場地則規劃朝「職訓大學」方式,提昇訓練效能。 前次審核 意見四 按勞委會表示,已訂定「職業訓練績效評鑑工作計畫」,並自九十一年八月起 陸續辦理評鑑工作,該評鑑結果與各訓練單位之施訓績效為何?又對於承辦單 位訓練成效缺乏評估部分,未見具體改善方案。 審核意見 勞委會已訂定「職業訓練績效評鑑工作計畫」,並自九十一年八月起陸續辦理 評鑑工作,該評鑑結果與各訓練單位之施訓績效為何?仍欠具體說明。又對於 承辦訓練單位之品質管控總評估類別及指標項目,以評估訓練績效部分,亦缺 乏具體改善方案。 辦理情形 說明 勞委會說明: 一、本會職訓局為達到提昇職業訓練成效,有效運用民間職業訓練資源,確保 訓練績效,提供多元化職業訓練之選擇,自九十一年起專案辦理「職業訓 練績效評鑑工作計畫」,由局屬六所職訓中心延攬學者專家組成評鑑委員 會,針對當年度受委託或補助辦理各類職業訓練方案之民間訓練機構進行 實地評鑑及就當年度結訓學員辦理問卷調查。 二、評鑑指標 (一)門檻指標-包括機構設立及消防安全檢查等二項。 (二)管理指標-包括專任訓練人員資格條件、教材、師資教學等十七項。 (三)輔導指標-包括學員就業率、是否提供就業輔導等三項。 (四)結訓學員問卷調查-包括對培訓單位及訓練內容之滿意度調查等項。 三、九十一年度評鑑結果-受評鑑單位共三三七家五八五班次,結訓學員問卷 調查一七、一一五人次。 (一)合格者有三二四單位,不合格者有十三單位。不合格原因包括無消防 安全檢查、無提供結訓學員就業資料、無提供具體受評資料、已註銷 設立登記等。 (二)受評單位、受評鑑職類、評鑑結果(合格與否)、結訓學員滿意度、 學員就業率等項資料,已於九十一年七月底公布,提供民眾未來參訓 之參考,同時列入職業訓練採購及淘汰不良訓練單位之參據。 四、九十二年度更擴大辦理,將本會職訓局所屬六所職業訓練中心也列入評鑑 ,同時委由第三者之民間中立機構辦理,以期評鑑結果更為客觀、公正。 糾正事項三 職業訓練券之核發法源不足,且勞委會未訂定合理補助方式及建立監督及評鑑 制度,致不切合實際需要,績效不彰。
監察院公報【第2653 期】 ‧73‧ 前次審核 意見二 請說明九十一年度對職業訓練券持券學員參訓之訓練單位所進行之查訪時間、 情形結果及評鑑制度內容為何? 審核意見 勞委會自九十二年一月一日起已實施「職業訓練券實施計畫」,惟未見具體改 善成果。 辦理情形 說明 勞委會說明: 一、本會職訓局九十二年一月二日新修訂之「職業訓練券實施計畫」,已規劃 委託品質管控單位,協助辦理本計畫項下訓練單位工作人員研習會、執行 學員上課及教師授課情形查核、督導教務管理等相關事宜、受理學員申訴 及建立處理制度、督導訓練單位辦理職業訓練生活津貼申領作業及結訓學 員就業情形之通報聯繫及統計等事項,以確保訓練品質。 二、九十二年度本會所屬六所職訓中心,分北(含北區職訓中心及泰山職訓中 心)、中(含桃園職訓中心及中區職訓中心)、南(含台南職訓中心及南 區職訓中心)三大區,依政府採購法之相關規定評選彙管單位辦理訓練品 質管控工作,九十二年度分別由中華民國全國工業總會(北區)、台灣發 展研究院(中區)、中華民國全國工業總會(南區)得標,協助訓練管理 等相關工作。 三、本會職訓局所屬職訓中心採抽查方式訪視服務轄區民間訓練單位承辦職訓 券學員訓練情形,抽訪比率不得低於百分之十;管控單位每班次實施二次 不預告訪視,以督導訓練單位確實執行訓練。九十二年度共計評選一三三 個訓練單位,六八五個班次,審查完成一五、五三四個訓練崗位,各公立 就業服務中心實際以職訓券模式推介失業勞工參訓人數為四、二八七人, 到訓人數為三、八五三人,實際受理持券學員參訓之訓練單位為八十九個 ,開辦二六二個訓練班次,各職訓中心共計訪視二八八次,管控單位訪視 五六六次,合計八五四次。 四、前項不預告訪視訓練單位辦訓情形,查核項目包含訓練單位是否為參訓學 員投保勞工保險,教師日誌是否由學員按時、據實填寫,導師級主管是否 批閱,訓練單位是否落實學員出缺勤管理,學員是否於原核准地點上課, 訓練單位是否收取其他額外費用,授課老師是否在場指導,學員評量管理 方式,是否設有導師、專人處理學員學習狀況及相關輔導事宜,是否提供 具體的就業輔導措施等,經查核各訓練單位均能依訓練契約內容確實執行 訓練,尚無重大缺失事項。 前次審核 意見四 勞委會未訂定職業訓練券之合理補助方式,致各職業訓練機構收費標準不一之 情形,未見檢討改善措施。 審核意見 勞委會所訂定「職業訓練券各職類訓練費用補助金額標準表」,請再詳為說明 對於各職業訓練機構收費標準不一之情形其具體改善成效。 辦理情形 說明 勞委會說明: 一、依九十二年一月二日新修訂「職業訓練券實施計畫」作業手冊經費編列項 目規定,由訓練單位按照各職類訓練班次所需實際費用,參酌下列項目核
監察院公報【第2653 期】 ‧74‧ 實編列(其中第五項勞工保險費,為保障學員權利為必要項目),惟申請 單位所送之訓練計畫每人/時訓練費用不得高於「職業訓練券各職類訓練 費用補助金額標準表」各職類補助上限,超過時將不予審查,另提送之訓 練計畫經費合理性納為補助評選項目之一,占權重百分之十。 二、參考項目及編列標準如下: (一)學雜費:以每人每小時十二元標準編列(支用於教材費、講義費、印 刷裝訂費、文具紙張費、招訓宣導費等)。 (二)材料費: 1.公訓機構技術人員養成訓練已有對照職類者,依時數比例核算後乘 以一點三編列。 2.本會職訓局提供之各地方政府曾辦理職類之材料費標準。 3.新開發職類,優先參照前1、2 項訓練近似職類之標準估列,如仍無 法比照者,可研提材料表憑核。 (三)鐘點費:課程總時數在一二○小時(含)以上,外聘專業師資鐘點費 每小時得以一六○○元編列,但以不超過課程總時數四分之一為原則 ,其餘時數鐘點費以每小時八○○元編列;課程總時數在一二○小時 以內之短期訓練班次,不受上述四分之一時數限制,但每科目外聘師 資鐘點以不得超過八小時為原則。訓練人數超過二十五人,術科得視 實際需要,安排一位助教協助教學,其鐘點費標準每小時以四○○元 編列。 (四)訓練單位之行政補助費:以各該班次學雜費、材料費、鐘點費等三項 費用實際核定額度總額的百分之十五編列,支用於訓練單位之事務費 、分攤水電費、行政人員加班費、輔導活動等與執行訓練計畫有關之 行政管理費用等。 (五)保險費:支用於受訓學員投保勞工保險費用,其標準依本會勞工保險 局現行標準編列。(本項為保障學員權利,各投標廠商應列為編列項 目之一,且簽約後應執行) (六)其它:由申請單位依實際需要編列項目並說明其用途。 糾正事項四 勞工保險失業給付尚乏詳細之評估與調查,致使預估與實際核付金額落差甚鉅 ,又失業給付期限未能與失業週數結合,未符需要,致效能不彰,顯欠允當。 前次審核 意見四 另為建構完善之就業安全體系,結合就業諮詢、就業服務及職業訓練,制定「 就業保險法」,未來勞委會將結合政府相關部門及民間就業服務與職業訓練資 源,加強辦理就業諮詢與職業訓練部分,僅說明於就業保險應收保險費百分之 十範圍內提撥專款,作為辦理在職與失業勞工之職業訓練費用暨獎助雇主僱用 本國籍失業勞工,並未對政府相關部門及民間就業服務與職業訓練資源如何結 合作整體規劃及說明。 審核意見 勞委會已對政府相關部門及民間就業服務與職業訓練資源如何結合作整體規劃 及說明,惟對政府相關部門及民間就業服務與職業訓練資源如何結合?未見說
監察院公報【第2653 期】 ‧75‧ 明具體實施績效。 辦理情形 說明 勞委會說明: 一、本會九十一年度及九十二年度分別結合五家民間單位提供深度就業諮詢服 務及就業促進研習活動。九十三年度則依政府採購法規定公開招標評選委 託二家民間單位提供個案管理員派遣人力,於各區就業服務中心(站)進 行個案管理服務、職業訓練諮詢服務,並結合三家民間單位辦理就業促進 研習活動。 二、在就業安全體系中,職業訓練、就業服務及失業給付是三位一體,需要緊 密結合,相輔相成。職訓體系蒐集就業職場動態訊息,規劃適性職業訓練 ,結訓後藉由就業服務體系輔導至職場工作;就業服務透過職業訓練提昇 失業者專業技能,促進國人就業,對於身心障礙、中高齡、原住民等就業 弱勢者,亦可減輕就業困難度。復且就業保險法自九十二年一月一日施行 後,更促使職業訓練、就業服務及失業給付體系之結合。未來區域職業訓 練中心將與就業服務中心相互整合,建構就業服務、職業訓練及就業保險 服務網絡,提供失業民眾職業訓練,為厚植「有準備的勞動力」而努力。 糾正事項五 臨時工作津貼、創業貸款利息補貼及僱用獎助津貼之核發,成效不彰。 前次審核 意見一 臨時工作津貼之目的係為紓緩及安定失業者失業期間之生活壓力,並協助及激 勵其迅速再就業,惟九十年臨時工作津貼實領人數比例偏低,該項津貼核發成 效顯然不彰,在我國失業率高居不下之情形下,未見提出具體有效檢討改善作 法,以充分發揮該項措施之效益。 審核意見 勞委會為使「臨時工作津貼」發揮就業促進之效能並符合法制,於九十一年十 二月三十日施行「就業促進津貼實施辦法」,並針對「臨時工作津貼」開辦以 來未臻完備處,加以改進,同時加強津貼領取與就業促進之關聯,惟究係如何 加強其關聯性未詳為說明。 辦理情形 說明 勞委會說明: 為加強臨時工作津貼領取者重返一般性市場,於失業者向公立就服機構求職登 記時,施予就業諮詢並推介就業,於十四日內如仍有就業困難者,才安排臨時 性工作,並於擔任臨時工作期間,適時推介就業及提供有給薪之求職假,以激 勵並促進失業者再就業,未來會持續追蹤臨時工作津貼人員就業情形。 前次審核 意見三 有關僱用獎助津貼核發欠缺稽核制度部分,請說明九十一年進行訪查日期、情 形與結果。又就業促進津貼辦法,對於雇主假非自願性失業勞工之名,行詐領 僱用獎助津貼之情形,有何相關規範措施? 審核意見 勞委會對於就業促進津貼辦法,針對雇主假非自願性失業勞工之名,行詐領僱 用獎助津貼之情形,雖採行「就業促進津貼查核計畫」、「雇主僱用失業者獎 助辦法」標準化作業流程,惟如何加強稽核制度,仍請再詳為說明。 辦理情形 說明 一、本會職訓局於九十一年八月十五日函送「就業促進相關津貼訪查記錄表」 及「就業促進相關津貼訪查統計表」,請各就業服務中心不定期派員進行
監察院公報【第2653 期】 ‧76‧ 訪查,並按月將訪查情形告知本會職訓局。又本會職訓局於九十二年四月 八日訂定「就業促進津貼查核計畫」,針對公立就業服務機構所推介可申 領僱用獎助津貼者是否屬就業弱勢、公立就服機構資料建置情形等加強查 核,及優先查核申請僱用獎助人數超過三十人以上之雇主等,以落實政策 目的。另各就業服務中心不定期以電訪、親訪等方式查察,以防止雇主不 實申領僱用獎助津貼。九十二年度共計查核三、七五四件,其中疑似不實 申領案件有五十三件,已交由公立就服機構續予查證後,依規定辦理追繳 事宜。 二、依「雇主僱用失業勞工獎助辦法」規定,雇主需先至公立就業服務機構辦 理求才登記,並於二個月內僱用公立就業服務機構或指定單位所推介之人 員,於連續僱用滿六個月才可提出僱用獎助津貼申請。因雇主所僱用之人 員,需向公立就服機構辦理求職登記,並經就業諮詢認為屬於就業弱勢且 符合獎助辦法適用對象,才可申領僱用獎助津貼,即可避免雇主假非自願 性失業勞工之名,不實領取僱用獎助津貼之行徑。 糾正事項六 資遣通報制度未能有效落實,相關主管機關執法不力,顯有疏失。 前次審核 意見二 對於資遣通報制度相關主管機關應如何落實執行?未見積極改善措施,請說明 相關法規、具體改進及檢討情形與九十一年度實施成效。 審核意見 對於資遣通報制度相關主管機關應僅提出相關規定,對於如何落實執行方式、 具體改善績效,未見說明。 辦理情形 說明 勞委會說明: 一、本會已於九十二年六月十二日職業字第○九二○○二九一八七號,函請各 縣(市)政府主管機關就權責加強宣導資遣通報制,並請於辦理講習會或 印製法令宣導資料時,強調本項規定,以有效落實資遣通報制度。 二、九十二年度被資遣離職員工之通報人數一九、五六五人。另九十二年度至 九十三年二月止各縣(市)政府依就業服務法規定處以罰鍰三萬元者計有 八家公司。較九十一年度未有處罰家數已有明顯改善。 三、至未來將積極循修法增列刑責,以貫徹落實本制度。 台北市政府勞工局說明: 一、落實執行方式: (一)本府勞工局業已建立資遣通報網路申報處理作業系統,設計自動分案 功能,依據本市失業勞工之需求,自動轉案本府勞工局就業服務中心 、職業訓練中心及勞委會職業訓練局各區就業服務中心協助渠等迅速 再就業。九十二年度總計資遣通報事業單位家數一、八九七家,被資 遣勞工一五、○三六人,有百分之二五之事業單位採取線上通報方式 作業。 (二)九十二年度查獲本市事業單位違反就業服務法第三十三條資遣通報規 定計十一家,經通知改善有十家,開具罰鍰處分計一家。 二、具體改善績效:
監察院公報【第2653 期】 ‧77‧ (一)印製宣導資料,加強宣導資遣通報義務。 (二)強化資遣通報系統處理功能,持續建置被資遣失業勞工資料庫。 (三)加強大型資遣案之被資遣失業勞工之專案輔導就業工作,協調事業單 位進廠服務,或於接獲通報之第一時間由就服中心相關人員全面清查 失業勞工之服務需求,立即規劃專案推介就業計畫或開辦職訓專班。 (四)繼續修正線上申辦作業系統,強化各項統計分析功能,並縮短加入會 員之申請審核時間,加強宣導,以提高事業單位的使用意願,減少公 文量。
行政院 函 發文日期:中華民國93 年11 月12 日 發文字號:院臺勞字第0930052416 號 主旨:貴院函,為本院函復,貴院前糾正政 府未能有效整合公、私立就業服務機 構體系,造成就業輔導業務事權不一 ,致就業服務績效不彰,且職業訓練 欠缺完整體系及評鑑機制,影響訓練 成效。又勞工保險失業給付,尚乏詳 細之評估與調查,導致預估與實際核 付金額落差甚鉅及臨時工作津貼、創 業貸款利息補貼、僱用獎助津貼之核 發,成效不彰,資遣通報制度未能落 實執行,均有未當案之處理情形,檢 附貴院審核意見,囑轉飭所屬檢討改 進見復一案,經交據本院勞委會會商 本院青輔會、本院退輔會、本院農委 會、本院研考會、台北市政府及高雄 市政府等有關機關函報檢討改善情形 ,尚屬實情,復請 查照。 說明: 一、復貴院九十三年八月二十三日(九三) 院台財字第○九三二二○○七九五號 函。 二、檢附本案之檢討改善情形一份。 (本件電子公文交換)
本案之檢討改善情形 糾正事項一 我國就業輔導事權不一,就業服務機構未能有效整合公、私立就業服務機構體 系,且人力及專業性不足,致就業服務績效不彰。 前次審核 意見 勞委會已研修「公立就業服務機構設置準則」報行政院於九十二年六月三十日 准予修正核定,該會於九十二年七月十四日發布施行;對於我國就業輔導事權 不統一部分,行政院在九十一年四月函送立法院審議之「行政院組織法」修正 草案中,規劃設置「勞動及人力資源部」,在合理的範圍內統一就業輔導事權 ,以避免職掌重疊;有關就業服務之事權統一與資源整合議題業已納入行政院 組織改造「厚生勞動工作圈」通盤檢討中,顯見已有具體研修方向,惟針對就 業服務之事權統一與資源整合乙節,仍請詳為說明具體進度與情形。 本次審核 意見 行政院組織改造「厚生勞動工作圈」,以職能為檢討重點,並就各區塊業務進 行去任務化、地方化、法人化、委外辦理之檢討,提出相關檢討結果與建議, 目前正由行政院組織改造推動委員會審查;又關於整合國內相關部會之求職求
監察院公報【第2653 期】 ‧78‧ 才資料庫,業將勞委會及青輔會共同列為該項服務之主辦機關,並確立勞委會 協調其他機關之正當性。至於人力與專業性部分,透過「三合一就服作業流程 」之規劃實施,及就服專業人力勞務外包等進用專業人員,進行各項專業訓練 。尚稱妥適,惟仍請將後續審查結果或辦理進度見復。 說明 研考會說明: 有關就業輔導事權不統一及職業訓練欠缺完整體系一節,因事涉本院及所屬機 關組織調整,前經本院組織改造「厚生勞動工作圈」業務檢討,並經本院組織 改造推動委員會完成第一階段組織改造四化業務之聯席審查,未來並將配合行 政院組織改造作業再進行整體檢討及調整。另依據九十三年九月十五日本院第 二九○六次院會通過,並於同年月日送請立法院審議之「行政院組織法」修正 草案,未來本院將設「勞動及人力資源部」,並將本院青年輔導委員會掌理之 青年職業訓練及就業服務業務移入該部辦理,至本院農業委員會及退除役官兵 輔導委員會等機關,因其各有特定服務對象,尚無職權重疊之現象。本案事涉 本院及所屬機關組織調整部分,宜配合本院組織改造時程辦理。 前次審核 意見 據勞委會說明,已訂定「行政院勞工委員會結合人民團體設立就業服務據點經 費補助計畫」並推動「就業推介媒合津貼」業務;青輔會表示已結合教育部、 勞委會共同進行大專畢業青年生涯發展意向調查與畢業生就業追蹤調查;輔導 會表示,將網路求職求才系統委託一○四人力銀行設置管理與維護,並與「台 灣加盟促進協會」、「中華民國生涯成長協會」合作辦理相關事宜;另外台北 市政府勞工局訂有「台北市結合勞資團體拓展就業服務網絡實施計畫」及「台 北市結合人力供應業拓展就業服務網絡計畫」;高雄市政府則委外就業促進研 習活動及深度就業諮詢業務。綜上所述,我國就業服務機構,係各自推動相關 措施,仍未能有效整合公、私立就業服務機構體系,仍請檢討見復。 本次審核 意見一 依據勞委會說明,該會得委任所屬就業服務機構或職訓機構、委辦直轄市、縣 (市)主管機關或委託相關機關(構)團體辦理就業服務。另運用民間團體之 彈性與活力,協助共同推動就業服務;青輔會以部分業務合作或委辦方式與私 立就業服務體系有效結合;輔導會則表示,該會與勞委會及青輔會,彼此分工 推動相關措施。由上觀之,三機關並未針對我國就業服務體系,如何有效整合 之檢討情形見復。 說明 勞委會說明: 公立就業服務機構體系之整合,需配合政府組織改造作業時程,俟行政院組織 法調整修正時,同時整併行政組織架構及就業服務業務,惟在行政院組織法未 調整前,各部會各依據現行相關組織法規,架構其就業服務體系,針對不同對 象各司其職。是以,如何有效整合我國目前其他就業服務機構體系,已規劃運 用資源整合使用方法,包括連結、協商、監督、宣導等方式,加強與各部會間 橫向及縱向資源整合,做法如下: (一)連結:國內就業市場區域整合性高,縣(市)之間勞動力具有高度移轉性 ,因此,為避免求職與求才的資訊,可能造成為各單位所壟斷的情形,導
監察院公報【第2653 期】 ‧79‧ 致國內就業市場與就業服務的分割化,已透過資訊網路整合,加強與各公 私立就業服務機構體系間的資源連結。 (二)監督:依據就業服務法第六條及第十二條規定,本會及直轄(縣)市政府 ,雖然得視業務需要,在各地設置公立就業服務機構,但為集中事權與精 簡資源,已加強透過年度計畫審核及業務監督,整合公立就業服務機構體 系資源。其次在整合公私立就業服務機構方面,將逐步釐清公私立就業服 務機構的角色分工,公立就業服務機構以管理工作、失業認定、補助金發 放、政策制定以及就業市場資訊的蒐集分析等涉及公權力者為主要業務; 至於就業諮商一節,則已部分委託私立就業服務機構辦理,政府扮演監督 、管理的角色,期能提高就業服務的效率。 (三)協商:為免就業服務機構體系在就業服務資源上形成重疊浪費現象,建立 部會間協商機制,加強部會間業務橫向聯繫,讓資源做適當、合理及有效 分配。 (四)宣導:本會未來在進行就業服務相關業務宣導時,在宣導內容上,除了本 會就業服務宣導外,可規劃納入其他部會或其他相關就業服務體系的就業 服務資源內容,讓社會大眾透過整合性的宣導內容,能夠了解政府在就業 服務上所提供的多方管道與多樣性服務選擇。 青輔會說明: 目前由研考會協助推動之電子化政府共通作業平台就業服務部分,業已決議由 勞委會統一發包建置。青輔會以網路提供求才求職服務部分,將與勞委會職訓 局洽商合作使用全國就業e網,提供便利的整合性服務。 退輔會說明: 退輔會辦理榮民就業工作係配合勞委會就業政策與榮民需求而辦理,目前共同 辦理與相互參與事項有「公共服務擴大就業」、各縣市「現場就業媒合活動」 與「專業人員訓練」等,另亦與勞委會、青輔會、國防部等四部會共同會銜辦 理「國軍屆退官兵就業服務活動」,依現行體系彼此分工,合作良好,有關權 責,並無涉私立就業服務機構。 本次審核 意見二 又據勞委會前說明,已訂定「行政院勞工委員會結合人民團體設立就業服務據 點經費補助計畫」;青輔會前表示,已結合教育部、勞委會共同進行大專畢業 青年生涯發展意向調查與畢業生就業追蹤調查;輔導會前表示,將網路求職求 才系統委託一○四人力銀行設置管理與維護,並與「台灣加盟促進協會」、「 中華民國生涯成長協會」合作辦理相關事宜;另台北市政府勞工局訂有「台北 市結合勞資團體拓展就業服務網絡實施計畫」及「台北市結合人力供應業拓展 就業服務網絡計畫」;高雄市政府則委外就業促進研習活動及深度就業諮詢業 務。綜上,本次函復內容並未詳細提出後續具體改進情形,且仍未就公立就業 服務機構體系如何與私立就服機構有效整合,提出具體改善措施,請行政院轉 請所屬確實檢討見復。 說明 勞委會說明:
監察院公報【第2653 期】 ‧80‧ 為有效整合公立就業服務機構體系與私立就業服務機構,在協助失業者就業方 式,已依據「就業促進津貼實施辦法」辦理就業推介媒合津貼業務,即公立就 業服務機構受理非自願離職者及特定對象失業者求職時,如未能推介就業,得 將該等人員轉介至本會職訓局指定單位(係指中央主管機關指定或委託之私立 就業服務機構及就業促進相關團體)以結合民間資源共同辦理就業服務。 台北市政府說明: 本府勞工局就業服務中心自九十一年起試辦「臺北市結合勞資團體拓展就 業服務網路實施計畫」,截至目前為止,已完成求才登記三一二家、一、六六 三人,協助會員廠商徵才三八八家、四七○人次,完成就業安置七十七人,轉 介申請獎助津貼一四六件、配合辦理職業訓練560 件、業務宣導一、四一一件 。本計畫係透過『虛擬人力供應中心』求職求才網路平臺系統,結合雇主、承 訓機構、勞工團體,使其進行資訊交流,並建置供使用會員簡易操作之後端管 理介面,可線上自行維護及更新所屬之會訊及求職求才之會員資料,並自行媒 合網站待聘人才資料庫及工作機會資料庫,已為公私立就服機構建立良好的合 作模式。 另為配合行政院勞工委員會職業訓練局定頒之「就業促進津貼實施辦法- 就業推介媒合津貼」,於九十二年再訂有「臺北市結合人力供應業拓展就業服 務網絡實施計畫」,九十三年修正為「臺北市結合人力仲介業拓展就業服務網 絡實施計畫」。 依據職業訓練局所訂之「就業推介媒合津貼指定單位」參加評選資格條件 ,將「過去曾接受政府委託或與政府合作從事就業服務之機構或團體,並具有 推介就業實際經驗及績效者」列為基本評選條件之一。人力仲介業要取得指定 單位資格,必先經過與政府合作或委託且具有就業服務實際績效後,才有可能 成為就業推介媒合津貼之指定單位。 故藉由「臺北市結合人力供應業拓展就業服務網絡實施計畫」之實施,截 至九十三年八月為止,參加本計畫之民間機構共計十三家。本府勞工局就業服 務中心共轉介二一五名求職者名冊予合作單位。經合作單位依據求職者工作意 願、能力及需求積極開發工作機會後,成功媒合十三名。另經考核各合作單位 之執行情形後,並將其中績效良好者推薦予職業訓練局以供評選成為下年度「 就業推介媒合津貼」指定單位。經職業訓練局正式核定後,始具備適用就業推 介媒合津貼之資格(「就業促進津貼實施辦法」中規定經指定之就業推介媒合 機構每推介一人成功就業至多領取一萬至一萬三千元之媒合津貼)。 前次審核 意見 據勞委會說明:行政院表示:全國各公立就業服務中心及站,已開辦結合失業 給付、就業服務與職業訓練三合一就業服務,求才利用率與日本差異不大,又 該會業開辦官方求職網站-全國就業e網,惟對於上開各項改進措施之具體成 果,如:求才利用率、失業給付、就業服務與職業訓練三合一就業服務成效, 仍請詳為說明改善結果。 本次審核 勞委會業已提出求才利用率、失業給付、就業服務與職業訓練三合一就業服務
監察院公報【第2653 期】 ‧81‧ 意見 成效,尚稱妥適,惟如何提高求才利用率並與失業給付、職業訓練、就業服務 等配套措施緊密結合,仍請再詳為說明。 說明 勞委會說明: 為提升求才利用率,本會特加強雇主服務工作,除於公立就業服務機構設立雇 主服務區,宣導政府相關促進就業政策(如僱用獎助津貼等),加強與廠商之 聯繫外,針對廠商之求才需要,如為大量徵才或急需召募人才時,亦針對求職 資料庫中未就業且符合雇主需要之求職者(含辦理失業認定之求職者)通知參 加面試;此外,為因應廠商大量求才之需要,特別量身訂做單一廠商之徵才活 動,以提升求才利用率。另本會業已將「失業給付」、「職業訓練」、「就業 服務」等配套措施與提高求才利用率作一緊密之結合,其做法說明如下: 一、依據就業保險法第十一條第一項第一款規定失業給付之請領條件為「被保 險人於非自願離職辦理退保當日前三年內,保險年資合計滿一年以上,具 有工作能力及繼續工作意願,向公立就業服務機構辦理求職登記,自求職 登記之日起十四日內仍無法推介就業或安排職業訓練」。是以,本會職業 訓練局自九十二年元月一日施行開辦的就業保險法即緊密結合了失業給付 、職業訓練及就業服務等三項工作,並明定失業勞工在申領失業給付之前 ,均應先向各公立就業服務機構辦理求職登記並接受推介就業或職業訓練 。該法實施後,各公立就業服務機構也整合前述三項服務,將失業登記、 就業諮詢、就業推介、職業訓練、失業認定,透過三合一就業服務單一窗 口的作業方式,提供就業諮詢、推介就業、或安排職業訓練的全程服務。 在做法上,首先建立起完整豐富的全國性求職求才資料庫系統,提供求職 民眾及雇主免費辦理求職求才登記及推介人才服務,除了臨櫃作業外,讓 民眾及求才廠商可於網際網路查詢就業機會及自動媒合,以系統提供快速 媒合作業,提高民眾求職意願及廠商便利且快速有效的求才目標。 二、此外,三合一就業服務辦理流程,包括各公立就業服務機構受理被保險人 求職登記後,進行簡易諮詢,依被保險人工作意願及工作能力情形及求才 廠商用人需求,積極進行推介就業,或由個案管理員評估,轉介參加本局 職業訓練中心所開辦之職業訓練課程,取得一技之長,以利進入職場做好 準備,另外也可配合訓用合一之措施,協助企業取得適當之人才,提升求 才利用率。如失業者未能於十四天內推介就業或安排職業訓練時,公立就 業服務機構就會於翌日完成失業認定,轉請保險人核發失業給付。在領取 失業給付期間,公立就業服務機構會要求申請人每個月必須提供二次以上 求職紀錄辦理失業再認定,鼓勵失業者積極尋職,如經三個月以上仍無法 順利推介就業,將進入個案管理服務,安排參加就業促進研習活動,或深 度就業諮詢。而為了鼓勵雇主僱用失業勞工,本會也推行提早就業獎助津 貼及僱用獎助津貼,申請人於失業給付請領期限屆滿前受雇工作,按其尚 未領取失業給付之金額50%,一次發給;而凡僱用公立就業服務中心所 推介之特定對象失業勞工或失業期間連續達一年以上之失業勞工,即可申
監察院公報【第2653 期】 ‧82‧ 請僱用獎助津貼,每月新台幣五千元,最高可領一年,藉以提高求才利用 率。 前次審核 意見 對於公立就業服務機構人力及專業性不足部分,勞委會將訂定「就業服務相關 工作勞務需求計畫」、將採取與民間事業機構策略聯盟方式,鼓勵民間參與投 入就業服務工作、結合民間團體辦理相關工作;青輔會刻正研究將就業服務網 站與行政業務分離,以投入專業人力、進行專案管理方式辦理;輔導會俟行政 院組織法修正通過後,再配合調整;台北市政府勞工局經由勞務外包派遣專業 人力協助提供就業服務;高雄市政府則是經常選送人員參加相關之訓練課程, 以充實其專業知能。顯見目前相關機關對於如何再強化人力專業性之具體改善 方案,係各自分離,未見整合,仍請行政院督促所屬檢討見復。 本次審核 意見 有關公立就業服務機構人力及專業性不足部分,勞委會已提出具體改善措施, 並詳細說明各項措施之內容及辦理情形,尚稱妥適;惟輔導會僅表示:「每年 除自行辦理就業服務人員專業訓練外,另亦派員參加勞委會所舉辦之就業服務 專業訓練。」未能詳細說明其具體改善情形,又青輔會僅稱:「該會將規劃增 強各大專校院就業輔導工作人員專業職能」亦未見具體改善方案及其辦理情形。 說明 退輔會說明: 一、本會在各縣(市)計有二十二個榮民服務處,分別編組一至二人辦理就業 輔導業務工作,其人力及專業性確有不足。 二、為落實推展就業服務,經訂定「結合地區聯絡體系,推展就業服務計畫」 ,運用服務區服務組長及服務員,提供義務性協助,以補人力之不足,將 來當配合政府組織改造狀況,適當檢討調整。 三、在增進專業性方面改善作法如下: (一)鼓勵承辦人至大專院校進修有關勞工、人力派遣、諮商面談等學科, 以吸取專業知識。 (二)指派承辦人員參加勞委會所辦各項講習與研討會。 (三)要求各就業輔導部門增購就業輔導書籍、雜誌,加強研讀,增進專業 能力。 (四)鼓勵各就業承辦人踴躍觀摩其他就業輔導機構所辦媒合、諮商規劃活 動,促進專業交流及經驗分享。 青輔會說明: 為加強各大專校院就業服務及生涯發展工作之橫向聯繫以及協調,青輔會將全 國一六一所大專校院按地區於九十年七月成立十組大專校院就業服務及生涯發 展資源中心,並舉辦大專校院生涯輔導工作人員培訓營五期(基礎、進階二○ 一至二○四),每期分北中南三區舉辦,參訓者共計一、一四○人次,另每年 舉辦大專院校生涯及就業輔導工作研討會乙次,以加強各校相關輔導人員專業 智能。 前次審核 意見 勞委會已說明該會職訓局之全國就業e網於九十二年六月三日開站,截至九十 二年六月底止,上網登記求職經推介成功就業者計一、○九四人,求才廠商找
監察院公報【第2653 期】 ‧83‧ 到所需人才者計八四九人。惟對於該項措施提高雇主使用公立就業服務機構服 務之意願及效能有何助益?及如何加強求職民眾與廠商之結合,仍請具體說明。 本次審核 意見 勞委會透過全國就業e網系統依據所設定之喜好工作條件或人才,自動進行工 作媒合服務,並透過語音系統通知相關求職求才訊息,全國e網客服人員也會 定期提供關懷服務之作法,以提高雇主使用公立就業服務機構服務之意願,惟 對於雇主使用公立就業服務機構服務之效能有何助益,及如何加強求職民眾與 廠商之結合,仍未見具體說明。 說明 勞委會說明: 一、本會為提高雇主使用公立就業服務機構服務之意願,特加強雇主服務工作 ,除於公立就業服務機構設立雇主服務區,宣導政府相關促進就業政策( 如僱用獎助津貼等),加強與雇主之聯繫外,針對雇主之求才需要,如為 大量徵才或急需召募人才時,亦針對求職資料庫中未就業且符合雇主需要 之求職者(含辦理失業認定之求職者)通知參加面試;此外,為因應廠商 大量求才之需要,特別量身訂做單一廠商之徵才活動,以提升求才利用率。 二、為有效提昇求職民眾與求才廠商媒合服務,依就業趨勢規劃一系列網路活 動,包括:求職就業喜洋洋活動、金職獎及線上就業博覽會活動等。在網 站推廣及規劃方面提供附加服務之規劃,包括: (一)產業專區—求職者於網站首頁,可以以通俗產業分類,快速找尋期望 進入企業目前所提供之所有工作機會,讓廠商和民眾可便利獲取彼此 媒合機會。 (二)火線議題—透過熱門就業相關議題民調,使民眾、企業及政府能進一 步了解彼此對於相關就業議題之看法與期望。 (三)職場雙週報—配合每一季最新資訊進度改版,並規劃名人開講、人資 專欄等內容,期以提供會員各項就業及產業發展趨勢之相關資訊。 (四)六大社群討論區—為使求職民眾及求才企業能有開放之溝通空間,特 別依不同對象及議題規劃身心障討論區、中高齡討論區、社會新鮮人 討論區、老闆討論區、青少年討論區及政府就業方案等六個設群討論 區,使民眾得以透過網路即時互動機制,建立即時有效之溝通管道。 二、未來,將規劃全國就業e網與科技客服整合之服務,透過○八○○七七七 八八八之七天二十四小時就業客服專線服務,提供民眾及企業更完善之就 業服務。 糾正事項二 我國職業訓練欠缺完整體系及評鑑機制,且施訓對象與訓練職種未能結合,致 無法符合就業市場需要,影響訓練成效。 前次審核 意見 據行政院研考會說明:行政院組織改造推動委員會下設政府民間夥伴小組、中 央地方夥伴小組、中央行政機關功能調整小組三個功能調整及經費、人事、法 制三個配套機制小組,將以職能檢討為重點,研議各訓練體系是否可由民間或 地方自治團體辦理;勞委會表示:已著手重建公共職訓體系,並將隸屬各行政 機關之公訓機構,納為各區域訓練資源提供者,未來將訓練業務及對象性質相
監察院公報【第2653 期】 ‧84‧ 同之青輔會青年職訓中心改隸該會;青輔會辦理職業訓練係以公開招標方式辦 理訓練;輔導會表示與勞委會、青輔會等體系充分配合;農委會則對於農漁民 轉業訓練,由勞委會公共職業訓練及就業服務機構規劃辦理。綜上,行政院對 於我國職業訓練機構分屬勞委會、退輔會、農委會等八個不同主管機關、財團 法人,目前訓練中心仍係各自為政,缺乏完整體系,未有具體改善方案。 本次審核 意見 有關我國職業訓練機構分屬勞委會、輔導會、農委會等八個不同主管機關,目 前訓練中心仍係各自分離,缺乏完整體系部分,未具體說明改善措施,僅係勞 委會、青輔會、輔導會、農委會等機關各自說明該機關之辦理情形,仍未針對 本院糾正事項,提出具體檢討方案,請行政院轉請所屬確實檢討見復。 說明 勞委會說明: 一、為因應行政院組織改造前整體訓練資源分配需求,現階段本會職業訓練局 將所屬六所職訓中心自九十年度起積極轉型為「區域職業訓練運籌中心」 ,並將全國區分為六大服務區域,交由各職訓中心擔任區域訓練資源整合 工作,其他非隸屬本會公訓機構則扮演訓練提供者角色。藉由本會所屬各 職訓中心依據各區域產業發展特色及訓練班次提供情況,進行整合、協調 、規劃等作業,避免訓練資源重複設置,以期有效運用政府有限訓練經費。 二、另配合行政院組織改造及精簡政策,依據公訓機構服務對象、訓練目的及 任務屬性之不同,規劃將同質性高之青輔會青年職訓中心改隸本會,以達 精簡政府組織規模,至於農委會及退輔會等機關之訓練中心,將按其業務 功能、組織定位等因素,納入行政院組織改造通盤檢討中,以期達成職業 訓練事權統一及精簡政府組織規模之目標。 青輔會說明: 行政院人事行政局於九十二年十二月十九日局考字第09200564522 號函之「行 政院所屬訓練機構轉型規劃案」及「行政院組織改造推動委員會第五次委員會 議紀錄」案決議略以,「本會青年職訓中心轉型列為訓練機構轉型規劃案之第 二階段」,建議俟成立「勞動及人力資源部」時,全國各公部門的職業訓練中 心同步整併,現階段本會青年職訓中心則是以執行待業民眾公費養成訓練,及 桃竹苗地區在職人員進修或合作(委託)訓練等相關業務為主,主要是扮演人 力資源提供者的角色,並自九十一年起,配合行政院勞委會職訓局政策,同步 調減養成訓練職類,其調減職類原則為參考職訓局所屬職訓中心調減訓練職類 的狀況、依據中心顧問委員會的建議、與綜合各科室所提供的相關資料,研擬 優先次序,從原先的十個職類,每年調減二個職類,預計至九十三年底,將依 計畫保留四個核心職類,並持續加強辦理核心職類的訓練工作,及積極輔導結 訓學員就業,以達訓用合一為目標。 退輔會說明: 一、國家為尊重軍人對社會之貢獻,特於憲法增修條文第十條第九項保障其退 伍後之就業權益,且退伍軍人由於長期服務於軍旅,有其獨特之族群屬性 與文化,因而設置專責機構辦理退除役官兵之職業訓練。
監察院公報【第2653 期】 ‧85‧ 二、退輔會訓練中心雖依「國軍退除役官兵輔導條例」第十三條之規定辦理退 除役官兵之職業訓練,惟有關職業訓練之實施仍受職業訓練法所規範,並 接受中央主管機關(行政院勞工委員會)之指導,尚非各自為政,且不與 其他中央主管機關之權責產生扞格。 前次審核 意見 據勞委會表示僅係配合職訓中心角色功能調整,辦理職訓師轉型訓練;輔導會 說明為訓練對象大致與訓練職類結合;台北市政府勞工局說明,九十二年一月 十五日完成「臺北市職業訓練職類發展策略」研究案,動員全體訓練師就各自 專業領域,積極展開革新步調。惟對於政府各訓練機關訓練師資專長及現有員 額不足、訓練對象與訓練職類未能結合,仍未具體整合,研提具體改善措施。 本次審核 意見一 據勞委會表示:該會配合職訓中心改造,施予系統之職訓師轉型進修訓練;而 現有職訓師繼續擔任核心職類訓練職務者,則激勵參與大專院校修習學分班、 推動國外進修及學術研討等,並輔以師資遴聘辦法升等(級)規定。為使適訓 者參與適性職業訓練,該會職訓局所屬六所職訓中心研提「台灣地區區域職業 訓練需求評估報告」,作為辦理職業訓練之參據,尚稱妥適,惟未見該會提出 具體成效。 說明 勞委會說明: 一、為強化本會核心職類訓練師教學職能,鼓勵參加進修研習,九十一至九十 三年度進修成果如次: (一)九十一年:研究所(碩、博士)五十三人;學分班三人,二技十八人 ,研討會十八人。 (二)九十二年:研究所(碩、博士)四十八人;學分班七人,二技八人, 研討會五十五人。 (三)九十三年:研究所(碩、博士)二十五人;學分班一人,二技十三人 ,研討會三十三人。 二、為使辦訓職類符合就業市場脈動,本會職業訓練局各職訓中心每年蒐集服 務轄區人力供需及產業發展情勢,研提「台灣地區區域職業訓練需求評估 報告」,並依據該報告邀集專家學者進行職類調整工作,九十一年度核定 所屬職訓中心調減三十三個職類,調整十二個職類,新增三十個職類;九 十二年度核定所屬職訓中心調減二十九個職類,調整二十九個職類,新增 十八個職類;九十三年度核定所屬職訓中心調減十八個職類,調整三個職 類,新增二個職類。案經訓練職類調整後,已逐漸改善訓後學員就業情況 (九十年度74.08%;九十一年度75.14%;九十二年度81.6%;九十三年 一至九月計辦理四、三一○人次,培訓二、八九七人,已就業一、九七五 人,尚繼續追蹤輔導就業中)。 本次審核 意見二 高雄市政府說明:該府勞工局訓練就業中心訓練師員額不足及訓練經費缺乏, 無法更新訓練職類,為因應市場需要,已委託學者針對缺失進行專題研究,初 步構想朝運用社會資源與民間社團、協會、工會等單位合作辦理就業市場急需 職類之職業訓練,該中心場地則規劃朝「職訓大學」方式辦理,處置尚屬合宜
監察院公報【第2653 期】 ‧86‧ ,惟仍請將後續辦理情形見復。 說明 高雄市政府說明: 一、本府勞工局訓練就業中心與「永達技術學院」及「高苑技術學院」洽談合 作辦理職訓大學,目前分別與兩校均簽妥合作意願書,並繼續規劃兩校與 市府簽署策略聯盟方式辦理職訓大學,另由兩校分別呈報教育主管單位核 准;職訓大學之規劃為結合職業訓練與大專校院教育資源,發展新技職教 育與訓練模式,培育職訓師資及高級技術人員,提昇職業技術層次,並提 供國民終身學習與生涯訓練機會,配合就業市場需求與轉型,結合技術證 照,建立技術人員回流訓練管道,增進專業技能,以因應國家經濟建設需 要。 二、本府勞工局訓練就業中心職業訓練之功能係提供一般求職者從事「職前訓 練」、「在職人員轉業訓練」、「在職人員第二專長訓練」等,結訓後輔 導參加技能檢定與就業;而人力發展局之功能係提供市府所屬公教人員之 在職進修訓練,發展公教人力資源;另高雄市立空中大學為高雄市市立最 高成人進修及繼續教育機構,負有規劃、研究、執行及推廣終身教育之責 任與功能。 本次審核 意見三 依據勞委會、台北市政府勞工局、高雄市政府等機關之說明,雖已提出相關改 善措施,惟對於政府各訓練機關如何結合訓練師資專長、員額、訓練對象與訓 練職類,仍尚乏具體改善措施。 說明 台北市政府說明: 一、本府勞工局職業訓練中心於九十三年下半年度起配合行政院經建會十二項 服務產業及本市振興景氣方案七大行業,規劃將原有六大傳統產業訓練職 類調整為九大新興服務產業職類計有資訊服務、金融服務、設計服務、通 訊媒體、流通運輸、物業管理、照顧服務、觀光休閒、汽機車保修等職類 ,未來將持續依產業興衰,以新興產業、熱門產業、主流產業等作為開發 單元且符合就業市場需求之職訓課程的依據。 二、除訓練職類調整外另將傳統自辦訓練模式轉型為產訓合作之自辦和委辦訓 練模式,各訓練師將採主動或拜訪產業與相關產業或產職業公(工)會團 體,尋求合作訓練空間,結合民間各項訓練資源,共同辦理符合產業需求 的職業訓練。 三、在符合產業技能需求的掌握下,將經過檢討調整確定辦理之訓練職類作完 整之課程設計,按現行公訓機構課程規範標準,依技能(專業術科)、知 能(專業學科)、共同通識課程(如行為態度、服務行銷、微型創業、就 業安全政策、勞動法規及勞工安全衛生等),並輔以職場適應訓練以及職 業評價、專案檢定等,規劃符合產業用人需求的職訓課程。在師資部分, 除現有具專業背景之專業訓練師外,配合政府人事精簡及組織再造政策, 除專業考量外儘可能不再循甄補方式遴聘專任師資,而係透過聘請具專業 背景及產業界具實務經驗之專業人士擔任參與相關訓練課程,及透過師資
監察院公報【第2653 期】 ‧87‧ 培訓協助本府勞工局職業訓練中心訓練師轉型,以因應新職類之開發與訓 練。 四、積極協助非自願性失業勞工及特定對象提升就業競爭能力,務期促使彼等 參訓「無障礙、零拒絕」。另為招募最適當之參訓學員施訓,配合就業保 險法對非自願性離職失業勞工,及就業服務法第二十四條對具特定對象身 分者之推介,結合本府勞工局就業服務中心與身心障礙資源中心及專業職 訓諮商評量團隊專業人員,對推介之失業勞工及特定對象進行諮商、評量 ,俾甄審出最適當之參訓需求者,施以完整之職訓課程。 前次審核 意見 勞委會已訂定「職業訓練績效評鑑工作計畫」,並自九十一年八月起陸續辦理 評鑑工作,該評鑑結果與各訓練單位之施訓績效為何?仍欠具體說明。又對於 承辦訓練單位之品質管控總評估類別及指標項目,以評估訓練績效部分,亦缺 乏具體改善方案。 本次審核 意見 勞委會僅就九十一年度辦理之職業訓練績效評鑑,說明其評鑑結果。包括:受 評鑑單位共三三七家五八五班次,結訓學員問卷調查一七、一一五人次,合格 者有三二四單位,不合格者有十三單位;惟對於各訓練單位之施訓績效及承辦 訓練單位之品質管控總評估類別及指標項目,以評估訓練績效,仍未具體說明 改善方案。 說明 勞委會說明: 一、本會職業訓練局執行各項訓練計畫過程中即辦理承訓單位之課程安排、師 資、環境、上課教材、消防安檢、學員學習狀況、就業輔導方式、辦理生 活津貼等項目之品質管控作業。 二、本會職業訓練局為達到提昇職業訓練成效,有效運用民間職業訓練資源, 確保訓練績效,提供多元化職業訓練之選擇,自九十一年起專案辦理「職 業訓練績效評鑑工作計畫」。 三、九十二年度更擴大辦理增加評鑑單位及結訓學員滿意度調查人數: (一)承訓單位品質管控總評估類別及指標項目如下: 1.基本條件(消防安全等門檻指標)合格者,始得繼續參加評鑑。 2.訓練能力(組織架構與規模、專業技術與人力之充裕性等機構指標 )佔20%。 3.核心價值80% (1)就業輔導績效(就業媒合及就業追蹤調查等學員就業率指標等) 佔40%。 (2)學員滿意度(訓用合一程度、訓練教學等滿意度調查指標等)占 40%。 (二)九十二年度經評鑑三八七家,三五五家合格占91.7%,不合格三十二 家占8.3%,並進行一、三九一個訓練班次四○、八三二位結訓學員 問卷調查,有效回收一二、七八七份,達31.24%回收率,經統計分 析,結訓學員整體滿意度有61%表示優、極優、37%表示尚可,只有
監察院公報【第2653 期】 ‧88‧ 2%表示差;有88%認為職訓課程對就業有幫助,目前有工作者占近 七成,只有三成尚未有工作。九十一年度評鑑結果—受評鑑單位共三 三七家五八五班次,結訓學員問卷調查一七、一一五人次,合格者有 三二四單位,不合格者有十三單位。 (三)將「受評鑑單位名稱」、「受評鑑職類」、「評鑑結果」、「結訓學 員滿意度」等資料並公布建置於本會職訓局「職業訓練資源網」;可 協助本會職訓局及受評單位瞭解學員對訓練課程滿意度及就業的情況 ;提供參訓者選訓時參考;並依評鑑結果列入職業訓練採購及淘汰不 良訓練單位之依據,使職業訓練更能迎合學員的需求及輔導提昇民間 職訓機構施訓品質。 糾正事項四 勞工保險失業給付尚乏詳細之評估與調查,致使預估與實際核付金額落差甚鉅 ,又失業給付期限未能與失業週數結合,未符需要,致效能不彰,顯欠允當。 前次審核 意見 勞委會已對政府相關部門及民間就業服務與職業訓練資源如何結合作整體規劃 及說明,惟對政府相關部門及民間就業服務與職業訓練資源如何結合?未見說 明具體實施績效。 本次審核 意見 勞委會雖已說明九十一年度及九十二年度分別結合五家民間單位提供深度就業 諮詢服務及就業促進研習活動,九十三年度則委託二家民間單位提供個案管理 員派遣人力於各區就業服務中心、站進行個案管理服務、職業訓練諮詢服務, 並結合三家民間單位辦理就業促進研習活動等作法,惟政府相關部門及民間就 業服務與職業訓練資源如何結合,仍未提出具體整合方案。 說明 勞委會說明: 一、本會依就業保險法第十二條及第二十五條、就業服務法第十七條辦理就業 諮詢服務,各公立就業服務機構於三合一服務流程中,由櫃台人員及個管 員提供求職者簡易諮詢、個案管理、職業訓練諮詢及就業促進研習活動等 諮詢服務。 二、為執行前開就業諮詢服務,各公立就業服務機構均亟需人力投入;因此由 各公立就業機構依政府採購法相關程序辦理招標委託事宜。九十三年度由 二家民間單位提供個案管理員派遣人力進駐於各區就業服務中心、站,及 委託三家民間團體辦理就業促進研習活動;透過政府勞務需求之購買,便 是為了有效結合民間就業服務資源,進而鼓勵民間企業參與政府公共事業。 三、依本會職訓局「職業訓練券實施計畫」規定,失業者需經公立就業服務機 構之個案管理員進行職訓諮詢,評估其參訓動機、目的、意願、期望、參 訓計畫、助(阻)力及能力等,認能以職業訓練提升就業能力者,始安排 職業訓練;除此之外,民間訓練單位提送訓練計畫書之內容,應包含達成 目標、適訓條件、課程內容簡介等等,並登入於職業訓練網內,當個案管 理員提供職訓諮詢時便可以透過網際網路獲得相關資料。透過上開職訓諮 詢機制及職業訓練網資料登載,便是為了有效結合及運用民間職業訓練的 資源。
監察院公報【第2653 期】 ‧89‧ 糾正事項五 臨時工作津貼、創業貸款利息補貼及僱用獎助津貼之核發,成效不彰。 前次審核 意見 勞委會為使「臨時工作津貼」發揮就業促進之效能並符合法制,於九十一年十 二月三十日施行「就業促進津貼實施辦法」,並針對「臨時工作津貼」開辦以 來未臻完備處,加以改進,同時加強津貼領取與就業促進之關聯,惟究係如何 加強其關聯性未詳為說明。 本次審核 意見 勞委會為加強領取臨時工作津貼領取者重返一般性市場,於失業者向公立就服 機構求職登記時,施予就業諮詢並推介就業,於十四日內仍有就業困難者,始 安排臨時性工作,並適時推介就業及提供有給薪之求職假,尚稱妥適,惟仍請 詳為說明該項措施之實施成效。 說明 勞委會說明: 臨時工作津貼九十二年度協助七六一人,核發新台幣五九、二一二、六五七元 。九十三年一至七月協助七一六人,核發新台幣三七、○一八、○六五元。 前次審核 意見 勞委會對於就業促進津貼辦法,針對雇主假非自願性失業勞工之名,行詐領僱 用獎助津貼之情形,雖採行「就業促進津貼查核計畫」、「雇主僱用失業者獎 助辦法」標準化作業流程,惟如何加強稽核制度,仍請再詳為說明。 本次審核 意見 勞委會對於「就業促進津貼查核計畫」及「雇主僱用失業者獎助辦法」,均說 明其稽核措施,惟僅說明「就業促進津貼查核計畫」之查核情形與成效。至「 雇主僱用失業勞工獎助辦法」之稽核情形與成效,則未見相關說明。 說明 勞委會說明: 因「雇主僱用失業勞工獎助辦法」與「就業促進津貼實施辦法」之僱用獎助津 貼查核原則相同,故納入就業促進津貼查核計畫中一併處理。 糾正事項六 資遣通報制度未能有效落實,相關主管機關執法不力,顯有疏失。 前次審核 意見 對於資遣通報制度相關主管機關僅提出相關規定,對於如何落實執行方式、具 體改善績效,未見說明。 本次審核 意見 資遣通報主要目的,係使政府能預先掌握被資遣勞工之訊息,並提供失業勞工 失業輔助及再就業機會,依據勞委會說明,九十二年度被資遣離職員工之通報 人數雖已有明顯改善,惟實際資遣人數與通報資遣人數之間是否存有明顯落差 ?至未來將積極循修法增列刑責,以落實資遣通報制度部分,仍請再詳為說明。 說明 勞委會說明: 一、依就業服務法第三十三條規定,雖課以雇主資遣通報的義務,除主管機關 主動查察,仍有賴勞工提供訊息,本會已於九十二年六月十二日職業字第 ○九二○○二九一八七號函請各縣(市)政府加強對勞工宣導,以有效落 實資遣通報。截至九十三年八月底止,縣(市)政府依法處罰之公司已有 十二家,已較前有所改善。 二、有關實際資遣人數與通報資遣人數之間是否存有明顯落差一節,因尚無實 際資遣人數之統計資料可供比對其落差,惟本會將再函請各縣(市)政府
監察院公報【第2653 期】 ‧90‧ ,要求轄區內雇主應依法通報;工會如有相關訊息,亦請儘速通知當地主 管機關查處。 三、有關修法增列刑責部分,由於業務法規除罪化原則,未來修法可考慮加重 行政處罰。至於應如何修法,將配合就業服務法其他條文修正時,一併辦 理。修法內容則先請當地主管機關縣(市)政府就執行層面提出修正意見 ,以供參考。 台北市政府說明: 如何落實實際資遣人數與通報資遣人數間之落差乙節,本府勞工局勞動檢查處 已將就業服務法第三十三條列為檢查項目,主動於勞動檢查時,要求事業單位 依法辦理,以落實事業單位資遣通報制度。
行政院 函 發文日期:中華民國97 年10 月27 日 發文字號:院臺勞字第0970046932 號
主旨:貴院函,為本院函復:貴院前糾正政 府未能有效整合公、私立就業服務機 構體系,造成就業輔導業務事權不一 致,就業服務績效不彰,且職業訓練 欠缺完整體系及評鑑機制,影響訓練 成效。又勞工保險失業給付尚乏詳細 之評估與調查,導致預估與實際核付 金額落差甚鉅及臨時工作津貼、創業 貸款利息補貼、僱用獎助津貼之核發 ,成效不彰,資遣通報制度未能落實 執行,均有未當之處理情形案,經貴 院財政及經濟委員會審議竣事,檢附 審核意見,囑轉飭所屬確實檢討改進 見復一案,經交據本院勞工委員會會 商本院國軍退除役官兵輔導委員會、 本院青年輔導委員會、本院研究發展 考核委員會、本院農業委員會、臺北 市政府及高雄市政府函報查處情形, 尚屬實情,復請 查照。 說明: 一、復貴院97 年8 月25 日(97)院台財 字第0972200023 號函。 二、檢附本案檢討改善情形1 份。 院長 劉兆玄
本案檢討改善情形 前次審核 意見一 行政院組織改造「厚生勞動工作圈」,以職能為檢討重點,並就各區塊業務進行 去任務化、地方化、法人化、委外辦理之檢討,提出相關檢討結果與建議,目前 正由行政院組織改造推動委員會審查;又關於整合國內相關部會之求職求才資料 庫,業將勞委會及青輔會共同列為該項服務之主辦機關,並確立勞委會協調其他 機關之正當性。至於人力與專業性部分,透過「三合一就服作業流程」之規劃實 施,及就服專業人力勞務外包等進用專業人員,進行各項專業訓練。尚稱妥適, 惟仍請將後續審查結果或辦理進度見復。 本次審核 研考會表示:「本案事涉行政院及所屬機關組織調整部分,宜配合該院組織改造
監察院公報【第2653 期】 ‧91‧ 意見 時程辦理。」惟其後續辦理情形及處理進度為何?請說明見復。 說明 研考會說明: 一、行政院為持續推動組織改造工程,已於本(97)年2 月20 日將「行政院組 織法」修正草案送請立法院審議;目前正依據總統競選政見,並參酌社會各 界反應,以前開送請立法院審議之草案版本為基礎,適度調整並提出符合未 來國家發展之草案版本。 二、未來俟「行政院組織法」修正草案等組織改造法案完成立法後,即進行行政 院所屬機關之組織調整作業,同時亦將按規劃之配套措施逐步落實推動,持 續進行流程及服務改造,以建構精簡、高效能的行政組織。 前次審核 意見二 依據勞委會說明,該會得委任所屬就業服務機構或職訓機構、委辦直轄市、縣( 市)主管機關或委託相關機關(構)團體辦理就業服務。另運用民間團體之彈性 與活力,協助共同推動就業服務;青輔會以部分業務合作或委辦方式與私立就業 服務體系有效結合;輔導會則表示,該會與勞委會及青輔會,彼此分工推動相關 措施。由上觀之,3 機關並未針對我國就業服務體系,如何有效整合之檢討情形 見復。 本次審核 意見 勞委會採取連結、監督、協商及宣導等措施,並由研考會協助推動之電子化政府 共通作業平台就業服務部分,業已決議由勞委會統一發包建置;至青輔會以網路 提供求才求職服務部分,將與勞委會職訓局洽商合作使用全國就業e網,提供便 利的整合性服務;另退輔會亦與勞委會、青輔會、國防部等共同會銜辦理「國軍 屆退官兵就業服務活動」,尚稱妥適,惟有關由研考會協助推動之電子化政府共 通作業平台就業服務部分,由勞委會統一發包建置乙節,仍請將後續辦理情形與 結果函復本院。 說明 勞委會說明: 一、研考會協助推動之電子化政府共通作業平台就業服務部分,於93 年12 月發 包,94 年9 月完成。青輔會系統資料並交由勞委會繼續服務民眾。 二、銓敘部公務員職缺公布系統因與人事行政局同質性過高,該部業於本(97) 年退出共通平台。 前次審核 意見三 又據勞委會前說明,已訂定「行政院勞工委員會結合人民團體設立就業服務據點 經費補助計畫」;青輔會前表示,已結合教育部、勞委會共同進行大專畢業青年 生涯發展意向調查與畢業生就業追蹤調查;輔導會前表示,將網路求職求才系統 委託104 人力銀行設置管理與維護,並與「台灣加盟促進協會」、「中華民國生 涯成長協會」合作辦理相關事宜;另台北市政府勞工局訂有「台北市結合勞資團 體拓展就業服務網絡實施計畫」及「台北市結合人力供應業拓展就業服務網絡計 畫」;高雄市政府則委外就業促進研習活動及深度就業諮詢業務。綜上,本次函 復內容並未詳細提出後續具體改進情形,且仍未就公立就業服務機構體系如何與 私立就服機構有效整合,提出具體改善措施請行政院轉請所屬確實檢討見復。 本次審核 本項僅有勞委會及台北市政府提出相關說明,青輔會、輔導會及高雄市政府並未
監察院公報【第2653 期】 ‧92‧ 意見 說明,請行政院轉請所屬再詳為補充說明。 說明 青輔會說明: 一、青輔會目前定位於青年職涯啟航、職能開發及就業促進,主要職責在於縮短 青年從學校進入職場之間的落差,建立青年從教育體系過渡到勞動市場之間 的轉銜機制。 二、青輔會目前並無提供直接性的就業服務措施,而是透過與各大專校院職涯輔 導單位合作,協助學校職輔人員及教師建立職涯規劃觀念,期能在校園內協 助青年於就學期間即做好職涯規劃,並透過補助高中職學校辦理產業與職涯 校園講座,讓在學青年瞭解行職業現況趨勢,以規劃未來職業發展,並提供 在學青年於在學期間透過見習、工讀、實習等工作體驗,釐清工作興趣,增 加未來進入職場的就業能力。 三、針對甫畢業進入職場,但尚未順利就業的青年,或是即將屆退的官兵,本會 分別與勞委會、經建會共同辦理青年職場體驗計畫,與國防部、勞委會、退 輔會共同辦理國軍屆退官兵就業服務活動,協助青年透過短期的職場體驗及 就業徵才活動等媒合方式,縮短進入職場的尋職期間;倘尚未能順利就業, 則由勞委會負責後續就業輔導事宜。 退輔會說明: 退輔會為與私立就業服務機構作有效整合,採行委託或策略聯盟方式,提供榮民 (眷)多元就業服務: 一、辦理屆退官兵就業服務巡迴活動:與青輔會、勞委會及國防部共同舉辦屆退 官兵就業巡迴活動,委託就業情報資訊股份有限公司於各地區辦理大、小部 隊逾15 場次之現場徵才及職涯發展座談等活動,提供屆退官兵即時就業服 務。 二、協洽台灣連鎖加盟促進協會,辦理連鎖加盟講座暨創業加盟說明會: 篩選優良連鎖加盟產業,提供加盟金優惠措施及辦理創業加盟說明會,提供 小額創業管道,並邀請連鎖加盟機構專家講授連鎖加盟創業趨勢與風險,俾 提供榮民(眷)多元創業機會。 三、增置「就業促進員」,推動社區外展服務:為充實本會各縣市榮服處就業站 人力,自本(97)年度起先行於就業業務繁複之5 個榮民服務處,以人力派遣 方式試辦增置就業促進員,目前計委託就業情報資訊股份有限公司及傑報資 訊管理顧問股份有限公司等承作,期能深入社區主動關懷失業榮民(眷)。 四、結合公、私立就業服務資源,多元拓展榮民(眷)就業管道:為達成降低失 業率目標,擬定相關積極性促進榮民眷就業方案: (一)洽訪標竿企業、團體爭取職缺。 (二)推展會屬單位產品通路自力創業。 (三)配合行政院專案推介就業。 (四)援用照顧弱勢者計畫,協洽廠商優先雇用榮民。 (五)輔導榮民學習創業,協助借貸資金。
監察院公報【第2653 期】 ‧93‧ (六)建立榮民就業資訊管理系統,促進線上媒合就業。 高雄市政府說明: 一、本府勞工局於96 年度邀請專家學者,針對本市立案之私立就業服務機構進 行業務評鑑,俾使各該機構確實依據法令辦理相關業務,提升服務功能,並 提供民眾選擇就業服務機構之參考,及了解仲介本國人在國內工作之私立就 業服務機構服務內容,以期提升私立就業服務機構服務品質。 二、有關公、私立就業服務體系整合部份,鑒於服務族群已具市場區隔,私立體 系多以中、高階人力為主,公立就服體系則負有照顧弱勢族群等競爭力較薄 弱者之職責;此外,私立機構多為虛擬平台提供網路資訊服務,公立機構則 為實體面對面提供諮詢服務,性質不同,各有不同服務重點,應兼容並進, 互為補充。本市就業促進研習運用1111 人力銀行提供服務;本(97)年5 月份另與104 人力銀行合作召開「南台灣觀光消費產業調查結果」記者會, 日後將持續合作。 前次審核 意見四 勞委會業已提出求才利用率、失業給付、就業服務與職業訓練3 合1 就業服務成 效,尚稱妥適,惟如何提高求才利用率並與失業給付、職業訓練、就業服務等配 套措施緊密結合,仍請再詳為說明。 本次審核 意見 勞委會為提升求才利用率,除加強雇主服務工作外,且為因應廠商大量求才之需 要,特別量身訂做單一廠商之徵才活動,另該會對於「失業給付」、「職業訓練 」、「就業服務」等配套措施與提高求才利用率之結合,提出多項做法,尚稱妥 適。 說明 【尚稱妥適,無需填報】 前次審核 意見五 有關公立就業服務機構人力及專業性不足部分,勞委會已提出具體改善措施,並 詳細說明各項措施之內容及辦理情形,尚稱妥適;惟輔導會僅表示:「每年除自 行辦理就業服務人員專業訓練外,另亦派員參加勞委會所舉辦之就業服務專業訓 練。」未能詳細說明其具體改善情形,又青輔會僅稱:「該會將規劃增強各大專 校院就業輔導工作人員專業職能」亦未見具體改善方案及其辦理情形。 本次審核 意見 退輔會及青輔會對於公立就業服務機構人力及專業性之不足,雖提出相關措施, 惟並未說明各項措施之具體內容、辦理情形與其成效,請行政院轉請所屬確實檢 討見復。 說明 青輔會說明: 為增強各大專校院就業輔導工作人員專業職能,青輔會自81 年即首創辦理大專 校院生團體輔導工作坊,之後持續辦理各項研習活動,並於91 年起規劃辦理「 大專校院生涯輔導人員課程培訓營」系列課程,於93 年6 月完成,共培訓1,140 人次,取得證書者961 人次,過程中並有許多建議與回饋;93 年9 月召開5 次 職涯培訓課程規劃會議,自94 年起至今,每年辦理「職涯諮詢人員培力研習營 」8 大系列課程,參與對象除了大專校院職輔人員、 高中職教師外,並提供各 公立就業服務機構人員參加,對提升公立就業服機構人力素質及專業性不足部分
監察院公報【第2653 期】 ‧94‧ ,應有助益。 退輔會說明: 退輔會針對機構人力及專業性不足部分,相關改進措施、成效如下: 一、充實機構人力: (一)退輔會於各縣市榮服處設置就業站,提供榮民(眷)直接就業服務,每 單位除編制內人員約2 人外,並進用勞委會就業促進津貼人員1 至2 人。 (二)自本(97)年起,於5 個榮民服務處以「人力派遣」方式試辦增置就業 促進員,各單位增置1 人,共計5 人;增置對象條件須符合大專以上畢 業或從事就業、勞工、社工等相關實務經驗2 年以上者,以提昇就業服 務品質。 二、提升服務人力專業性: (一)為提升就業服務人員專業素質,針對就業輔導政策、目標與精進做法、 最新之就業市場現況、與勞委會就業職訓業務進行經驗交流、公私立就 業服務機構業務觀摩、求職就業輔導、諮商輔導技巧等,每年均辦理3 日以上專業訓練,邀集各縣市榮服處就業站就業服務人員、主管參訓, 增進渠等就業服務知能。 (二)為落實就業服務人員專業證照制度,退輔會分別於本(97)年4 月22 日至25 日及7 月15 日辦理「97 年度就業服務人員研習班」及「就業 服務專業人員乙級技術證照檢定輔導班」,各縣市榮服處暨訓練中心就 業承辦人、退輔會相關人員等分別計58 人及28 人參加。 (三)退輔會暨各附屬機構於本(97)年7 月間首次報考「就業服務專業人員 乙級技術證照檢定」計21 人,錄取人數6 人,及格率逾28%,逾全國 及格比例,今後將積極督促就業服務人員儘速取得專業證照。 高雄市政府說明: 高雄市政府勞工局及所屬訓練就業中心、博愛職業技能訓練中心為提升就業服務 人員專業知能,本(97)年度邀請具實務經驗人員為業務相關同仁辦理相關研習 課程,計有:雇主服務區作業流程實務操作、綜合服務區作業流程實務操作、特 定對象推介流程、僱用獎助辦理流程、國民年金及勞保年金簡介及身心障礙者職 業重建計畫服務人員培訓計畫等課程,並安排參訪雲嘉南就業服務中心所屬就業 服務站實務運作情形,交流彼此經驗、提升同仁專業知能,並收見賢思齊之效。 前次審核 意見六 勞委會透過全國就業e網系統依據所設定之喜好工作條件或人才,自動進行工作 媒合服務,並透過語音系統通知相關求職求才訊息,全國e網客服人員也會定期 提供關懷服務之作法,以提高雇主使用公立就業服務機構服務之意願,惟對於雇 主使用公立就業服務機構服務之效能有何助益,及如何加強求職民眾與廠商之結 合,仍未見具體說明。 本次審核 意見 一、勞委會對於雇主使用公立就業服務機構服務之效能方面,除於公立就業服務 機構設立雇主服務區,並針對雇主求職資料庫中未就業且符合雇主需要之求 職者通知參加面試,並辦理單一廠商之徵才活動,尚屬合宜,惟具體成效請
監察院公報【第2653 期】 ‧95‧ 補充說明見復。 二、有關如何加強求職民眾與廠商之結合部分,勞委會已提出四項具體措施,並 於未來將規劃全國就業e網與科技客服整合之服務,提供民眾及企業更完善 之就業服務,請將後續辦理情形說明見復。 說明 勞委會說明: 一、公立就業服務機構辦理徵才活動,96 年舉辦2,748 場,服務3,659 家廠商, 成功媒合33,732 位,本(97)年1 至8 月舉辦2,306 場,服務3,579 家廠商 ,成功媒合人數32,740 位。 二、本會職訓局全國就業e 網已完成規劃產業專區、火線議題、職場雙週報、6 大社群討論區等附加服務,並於93 年7 月成立「就業服務科技客服中心」 ,整合「全國就業e 網」(http://www.ejob.gov.tw)及就業服務科技客服中 心、0800777888 免付費就業服務專線等,提升為民服務的品質與範疇。96 年度服務求職人數128,724 人次、求才人數197,137 人次。本(97)年度截 至8 月底止,服務求職人數110,945 人次、求才人數98,287 人次。 前次審核 意見七 有關我國職業訓練機構分屬勞委會、輔導會、農委會等8 個不同主管機關,目前 訓練中心仍係各自分離,缺乏完整體系部分,未具體說明改善措施,僅係勞委會 、青輔會、輔導會、農委會等機關各自說明該機關之辦理情形,仍未針對本院糾 正事項,提出具體檢討方案,請行政院轉請所屬確實檢討見復。 本次審核 意見 勞委會表示對於非隸屬該會公訓機構,係藉由該會所屬各職訓中心依據各區域產 業發展特色及訓練班次提供情況,進行整合、協調、規劃等作業;至農委會及退 輔會等機關之訓練中心,將納入行政院組織改造通盤檢討中;青輔會建議俟成立 「勞動及人力資源部」時,全國各公部門的職業訓練中心同步整併;退輔會則表 示該會辦理退除役官兵之職業訓練,仍受職業訓練法所規範,並接受勞委會之指 導,綜上,我國職業訓練機構雖分屬勞委會、輔導會、農委會等8 個不同主管機 關,惟訓練中心可通盤檢討,建立完整體系,究應如何整合,請說明見復。 說明 勞委會說明: 一、勞委會所屬北區、桃園、中區、台南、南區職訓中心自91 年起從單純的職 業訓練提供角色轉型職業訓練運籌中心,擔負職訓資源整合、規劃購買、績 效評鑑及諮詢推介區域運籌功能。本會將持續督導各中心加強提升運籌效能 ,提供契合就業市場需求之人才發展。 二、依行政程序法規定,行政機關之管轄權仍須依其組織法規行之,是以退輔會 專司辦理退除役官兵職業訓練,農委會專司農漁民職業訓練,青輔會專司青 年職業訓練與本會專司整體勞工就業訓練之對象,具有相輔相成功能。 三、勞委會每年均辦理公立職訓中心聯繫會報加強彼此聯繫、協調,並推動訓練 品質規範,藉以提升公私立訓練機構訓練品質。 農委會說明: 一、農委會農漁民離農轉業訓練,係每年透過各縣市政府參考勞委會公共職訓體
監察院公報【第2653 期】 ‧96‧ 系之訓練項目,考量農漁民生活作習、學習之便利性與需求,於農暇就近利 用當地農漁會既有之設備與資源,以及附近職業學校之專長,規劃辦理農漁 民第二專長訓練,與公共職訓機構有互補之效,對於協助農漁民儲備第二專 長職能及以兼業方式,增加農業外收入多有助益。 二、為鼓勵農漁民參加第二專長訓練並取得職業證照,以增加就業能力與機會, 訓練課程含括證照考試學科與術科,通過國家職業證照者並發給獎勵金,以 資鼓勵。 三、至於協助就業事宜,勞委會補充說明,該會與農委會於90 年10 月16 日會 銜頒訂「加強辦理農漁民轉業及第二專長職業訓練實施計畫」,針對農漁民 轉業及第二專長進行職業訓練,勞委會所屬職業訓練及就服中心,對欲轉業 或學習第二專長之農漁民視同一般勞工,進行輔導及訓練。 四、另本會漁業署遠洋漁業開發中心已將漁船船員訓練業務依區域漁民訓練需求 ,委託當地專業學術機構辦理,目前該中心已轉型負責統一編審訓練教材、 委辦機構師資設備評鑑、建立題庫、督導執行、訓練考核、學員意見反應等 行政業務,未來將配合該署組織調整,銜接其他漁業管理業務。綜上,考量 漁業特殊性與專業性,漁船船員訓練仍宜由本會漁業署規劃辦理。 青輔會說明: 一、現階段青輔會青年職訓中心係執行待業民眾公費養成訓練,及桃竹苗地區在 職人員進修或合作(委託)訓練等相關業務為主,並配合勞委會職訓局政策 ,保留4 個核心職類,持續加強辦理核心職類訓練工作,並積極輔導結訓學 員就業,訓練班別以工業類為主。 二、由於勞委會職訓局所屬桃園職訓中心正轉型為服務類為主之職訓中心,因此 ,中心正與桃園職訓中心協調職訓之資源整合,未來將進一步配合政策執行。 前次審核 意見八 據勞委會表示:該會配合職訓中心改造,施予系統之職訓師轉型進修訓練;而現 有職訓師繼續擔任核心職類訓練職務者,則激勵參與大專院校修習學分班、推動 國外進修及學術研討等,並輔以師資遴聘辦法升等(級)規定。為使適訓者參與 適性職業訓練,該會職訓局所屬六所職訓中心研提「台灣地區區域職業訓練需求 評估報告」,作為辦理職業訓練之參據,尚稱妥適,惟未見該會提出具體成效。 本次審核 意見 勞委會已就該會核心職類訓練師教學職能,鼓勵參加進修研習部分,提出91 年 至93 年之進修成果,且該會依據「台灣地區區域職業訓練需求評估報告」,說 明91 年度至93 年度進行職類調整工作情形,並提出訓練職類調整後,改善學員 就業情況之成效,尚稱妥適。 說明 【尚稱妥適,無需填報】 前次審核 意見九 高雄市政府說明:該府勞工局訓練就業中心訓練師員額不足及訓練經費缺乏,無 法更新訓練職類,為因應市場需要,已委託學者針對缺失進行專題研究,初步構 想朝運用社會資源與民間社團、協會、工會等單位合作辦理就業市場急需職類之 職業訓練,該中心場地則規劃朝「職訓大學」方式辦理,處置尚屬合宜,惟仍請
監察院公報【第2653 期】 ‧97‧ 將後續辦理情形見復。 本次審核 意見 高雄市政府表示:該府勞工局訓練就業中心與「永達技術學院」及「高苑技術學 院」洽談合作辦理職訓大學,目前分別與兩校均簽妥合作意願書,並繼續規劃兩 校與市府簽署策略聯盟方式辦理職訓大學,尚稱妥適,惟仍請將後續辦理情形見 復。 說明 高雄市政府說明: 一、94 年高苑技術學院依「產學訓人才投資方案訓練」向教育部申請核准,並 與高雄市政府勞工局訓練就業中心合作辦理「自動化加工班」訓練,後因 95 年招生人數不足,且師資人力調配困難而停滯,嗣後高苑技術學院未再 向教育部提出申請,致使該中心未能持續與該校合作辦理訓練。 二、另本(97)年教育部積極推動「產學攜手合作計畫」,該中心積極爭取與高 雄市立中正高工及正修科技大學共同合作辦理「高級精密機械班」,以提供 產業就業市場所需人才,讓每位學員均具有技術、證照、學歷,共創產官學 三贏局面。 前次審核 意見十 依據勞委會、台北市政府勞工局、高雄市政府等機關之說明,雖已提出相關改善 措施,惟對於政府各訓練機關如何結合訓練師資專長、員額、訓練對象與訓練職 類,仍尚乏具體改善措施。 本次審核 意見 本項審核意見僅有台北市政府提出相關說明,另勞委會及高雄市政府等對於各訓 練機關如何結合訓練師資專長、員額、訓練對象與訓練職類,仍未見相關說明。 說明 勞委會說明: 一、勞委會職訓局6 所職業訓練中心職訓師係擔任自辦職前訓練師資,自辦職前 訓練職類以工業技術職類為主,為民間培訓產業大多不願投資辦理或投資成 本龐大之訓練,經行政院91 年7 月25 日院授人力字第0910020957 號函核 定該等中心「現有員額除主任外,均出缺不補」。復為解決各職業訓練中心 員額「除主任外,均出缺不補」所引發之問題,經行政院93 年5 月19 日院 臺勞字第0930021499 號函復略以:為因應職訓局規劃推動職訓中心轉型事 宜之迫切人力需求,同意各區職訓中心所有行政主管職務同意遴補;職訓師 員額將來出缺改以聘用方式進用,6 中心員額管控410 人。基此,各中心核 心職類訓練師出缺後,改以聘用人員遴補辦理。 二、惟各中心自辦訓練師出缺依「聘用人員聘用條例」聘任學(業)界專業人才 從事訓練教學工作,不易順利聘用優秀專業師資擔任專責教學工作,影響自 辦訓練營運之困境。 三、為解決職業訓練師人力遞減,影響經驗傳承問題,勞委會職訓局已請泰山職 訓中心規劃辦理「新進職業訓練師師資培訓」,及各職訓中心每年度辦理職 訓師在職進修訓練,增進職訓師專業知能與實務技術能力,提升教學品質。 四、勞委會職訓局所屬職訓中心依據就業市場需求情況,開辦以就業為導向之訓 練課程,使受訓學員習得專精技能,切合事業單位用人需求。藉由甄選機制
監察院公報【第2653 期】 ‧98‧ ,協助篩選適訓之失業者參加適性訓練;並於學員受訓期間即先主動蒐集事 業單位用人需求並積極推介學員就業。 五、勞委會職訓局所屬職業訓練中心已轉型為區域運籌中心角色,為有效掌握服 務轄區內就業巿場人力供需趨勢、職業訓練需求、及分析培訓單位現況、容 量與品質等資源整合,自95 年起各職訓中心針對事業單位及培訓單位之職 訓需求調查辦理1 年1 次「即時性區域職業訓練供需調查」,以掌握職訓需 求現況,並將調查結果做為下年度規劃辦理職業訓練之重要參據。 六、96 年度計辦理水電、銲接、電腦輔助機械設計與製造、機電整合、精密機 械、冷凍空調、電機工程、通訊電子、工業電子、複合式冰品製作、視覺傳 達設計、服裝設計與製造、物業管理設施、電腦輔助服裝打版、電腦輔助模 具設計實務、電腦輔助模具設計製作(模具CAD/CAM)、精密塑模設計與 製造、電腦輔助機械製造、綜合機械、板金設計與製造、微晶片電子控制、 金屬熔接技術、汽車修護、機械加工與CNC 車床、電腦數值控制機械、電 腦編輯排版印刷、遊艇木工裝潢實務、泥水砌磚、創意家具設計及製作等職 類,共訓練6,469 人;本(97)年至8 月底止計訓練5,603 人。 高雄市政府說明: 高雄市政府勞工局訓練就業中心依現有訓練師(6 名編制內、3 名約僱)專長及 機具設備開辦日間職前訓練班及專精訓練班,並委請學者進行新職類開發分析研 究,以供現有訓練師轉型之參考。另訓練師遇缺不補之政策造成本中心師資嚴重 短缺,只能以外聘終點費聘請師資彌補,影響該中心新職類之開發與發展。 前次審核 意見十一 勞委會僅就91 年度辦理之職業訓練績效評鑑,說明其評鑑結果。包括:受評鑑 單位共337 家585 班次,結訓學員問卷調查17,225 人次,合格者有324 單位, 不合格者有23 單位;惟對於各訓練單位之施訓績效及承辦訓練單位之品質管控 總評估類別及指標項目,以評估訓練績效,仍未具體說明改善方案。 本次審核 意見 勞委會已說明承訓單位品質管控總評估類別及指標項目,以及92 年度評鑑情形 ,並經統計分析結訓學員整體滿意度情形,此外,該會並將「受評鑑單位名稱」 、「受評鑑職類」、「評鑑結果」、「結訓學員滿意度」等資料並公布建置於「 職業訓練資源網」,以協助該會職訓局及受評單位瞭解學員對訓練課程滿意度及 就業情況;提供參訓者選訓時參考;並依評鑑結果列入職業訓練採購及淘汰不良 訓練單位之做法,尚稱妥適。 說明 【尚稱妥適,無需填報】 前次審核 意見十二 勞委會雖已說明91 年度及92 年度分別結合5 家民間單位提供深度就業諮詢服務 及就業促進研習活動,93 年度則委託2 家民間單位提供個案管理員派遣人力於 各區就業服務中心、站進行個案管理服務、職業訓練諮詢服務,並結合3 家民間 單位辦理就業促進研習活動等作法,惟政府相關部門及民間就業服務與職業訓練 資源如何結合,仍未提出具體整合方案。 本次審核 有關政府相關部門及民間就業服務與職業訓練資源如何結合,仍未提出具體整合
監察院公報【第2653 期】 ‧99‧ 意見 方案乙節,勞委會僅說明各公立就業服務機構依政府採購法相關程序辦理招標委 託辦理就業諮詢服務事宜,及由公立就業服務機構之個案管理員進行職訓諮詢並 對於民間訓練單位提送訓練計畫書之內容,應包含達成目標、適訓條件、課程內 容簡介等,登入於職業訓練網,惟究應如何整合公私立就業服務與職業訓練資源 ,仍請說明見復。 說明 勞委會說明: 一、公私立就服機構之業務區隔主要在於公立就業服務機構涉及公權力行使,而 私立就服機構僅提供求職求才服務,二者業務性質不同,有關整合公私立就 業服務部分,本會除結合私立就業服務機構提供勞務委外、深度就業諮詢服 務、就業促進研習活動外,並藉由舉辦就業論壇或研討會的方式邀請私立就 服機構參與,以達經驗交流及資源共享之目的。另有關就業、訓練資源整合 的部分,各就服與職訓中心每年定期辦理訓就聯繫會報,針對訓練及就業資 源整合問題進行檢討。 二、勞委會職業訓練局所屬5 所職訓中心分區辦理轄區內職業訓練供需調查,透 過調查結果及配合產業需求,運用民間師資、場地、設備、教材、課程服務 等相關訓練資源,針對原住民等特定對象及失業者訓練,考量不同區域特色 及所需各項訓練職類,委託或補助民間訓練單位辦理各項職前訓練【96 年 度計委託或補助社(財)團法人、補習班、大專院校、事業單位等222 家訓 練單位辦理資訊軟體與新興重點發展產業人才職業訓練、中長期、原住民、 新移民特定對象專班等各項職業訓練。】,培養或提升就業技能,以促進其 就業或創業。 三、勞委會職業訓練局為方便民眾查詢及線上報名職訓課程,業已建置「職訓e 網」http://www.etraining.gov.tw 提供本局暨所屬各職訓中心自辦、委辦及補 助辦理之職訓課程資訊,並整合青輔會、退輔會、漁業署遠洋漁業開發中心 、台北市、高雄市政府勞工局訓練就業中心等公立職訓所辦理之訓練課程, 提供民眾及企業查詢完整之職訓課程服務平台。另目前「職訓e 網」系統定 期傳送各職訓中心辦訓資料,至網際網路就業服務系統(以下簡稱就服系統 )供就服中心推介訓練使用,並將「職訓e 網」系統內結訓後3 個月仍未就 業之學員資料,自動傳回就服系統,由就服中心接續協助就業相關事宜。 前次審核 意見十三 勞委會為加強領取臨時工作津貼領取者重返一般性市場,於失業者向公立就服機 構求職登記時,施予就業諮詢並推介就業,於14 日內仍有就業困難者,始安排 臨時性工作,並適時推介就業及提供有給薪之求職假,尚稱妥適,惟仍請詳為說 明該項措施之實施成效。 本次審核 意見 勞委會表示:「臨時工作津貼92 年度協助761 人,核發59,212,657 元。93 年1 至7 月協助716 人,核發37,018,065 元。」由上觀之,前揭說明係為領取臨時工 作津貼之人數及金額,顯非為領取臨時工作津貼者重返一般性市場之成效,仍請 該會再詳為說明。
監察院公報【第2653 期】 ‧100‧ 說明 勞委會說明: 領取臨時工作津貼者返回職場再就業之確切數據,將與勞工保險局勾稽比對領取 津貼人員之投保資料,預計本(97)年11 月底完成,即可呈現實施成效。 前次審核 意見十四 勞委會對於「就業促進津貼查核計畫」及「雇主僱用失業者獎助辦法」,均說明 其稽核措施,惟僅說明「就業促進津貼查核計畫」之查核情形與成效。至「雇主 僱用失業勞工獎助辦法」之稽核情形與成效,則未見相關說明。 本次審核 意見 有關勞委會就「雇主僱用失業勞工獎助辦法」之稽核情形與成效表示:「『雇主 僱用失業勞工獎助辦法』與『就業促進津貼實施辦法』之僱用獎助津貼查核原則 相同,故納入就業促進津貼查核計畫中一併處理」,其說明尚稱妥適。 說明 【尚稱妥適,無需填報】 前次審核 意見十五 資遣通報主要目的,係使政府能預先掌握被資遣勞工之訊息,並提供失業勞工失 業輔助及再就業機會,依據勞委會說明,92 年度被資遣離職員工之通報人數雖 已有明顯改善,惟實際資遣人數與通報資遣人數之間是否存有明顯落差?至未來 將積極循修法增列刑責,以落實資遣通報制度部分,仍請再詳為說明。 本次審核 意見 有關實際資遣人數與通報資遣人數之間是否存有明顯落差,勞委會僅以行文方式 函請各縣(市)政府,要求轄區內雇主應依法通報,並未積極提出具體有效改善 措施,請行政院督促所屬確實檢討見復。另對於有關修法增列刑責部分,勞委會 表示:「將配合就業服務法其他條文修正時,一併辦理。」請將後續辦理情形與 進度函復本院。 說明 勞委會說明: 一、查96 年資遣離職員工列冊通報人數為76,670 人,初次申請失業認定人數為 80,730 人、完成失業認定人數為72,721 人。故目前已無太大差異。且雇主 應辦理資遣通報的情形,是指依勞動基準法第11 條、第13 條但書及第20 條規定終止勞動契約。而失業給付所稱的「非自願離職」,指被保險人因投 保單位關廠、遷廠、休業、解散、破產宣告離職;或因勞動基準法第11 條 、第13 條但書、第14 條及第20 條規定各款情事之一離職。二者適用法規 不同,故人數亦有不同。 二、另本會前於95 年2 月22 日職業字第0950002659 號函請勞保局於勞保繳費 通知單內,附夾有關資遣通報之宣導文宣,告知各投保單位(雇主)相關資 遣通報規定,勞工保險局並已辦理完竣。 三、有關資遣通報修法案,本會前已研擬草案,惟立法院及相關單位仍有不同意 見。本會於本(97)年7 月29 日邀請勞雇雙方代表、學者召開「就業服務 相關法規論壇」會中就資遣通報規定案提請討論,結論為:「資遣通報是一 個選擇性的需求,不是一個強制性的需求,目的是促進協助就業,所以通報 就服機構很明確,通報縣市政府沒有必要。」本會目前正參考前開結論重新 評估。 註:本案經本院財政及經濟委員會第4 屆第3 次會議決議:「結案」
監察院公報【第2653 期】 ‧101‧ ***************** 巡察報告 ***************** 一、本院97 年度地方巡察第2 組報告 (高雄市政府) 巡察委員:趙委員榮耀、沈委員美真 巡察機關或巡察地區:高雄市政府 巡察時間:98 年4 月2 日、3 日 巡察經過: 一、4 月2 日:(一)上午10 時至12 時15 分:巡察停車場規劃、使用效益及管理 情形。(二)下午2 時30 分至5 時30 分 :於高雄市政府三樓會議室受理民眾暨 團體陳情。 二、4 月3 日:(一)上午9 時至12 時:巡 察經濟不景氣衍生就業、就學及社會福 利救助問題之因應措施。(二)下午2 時 30 分至5 時:巡察國宅業務。 三、接見人民陳情20 人;接受人民書狀12 件。 巡察委員發言紀要: 壹、巡察停車場規劃、使用效益及管理情形 趙委員榮耀 一、高雄市現有14 座立體停車場之中, 只有3 座是有盈餘的,其餘都是虧損 ,該14 座立體停車場新建的經費來 源,中央(交通部)與地方分配的比 例如何?其新建位址的選擇及時機是 否妥適?是由中央或地方決定? 二、14 座立體停車場中,有那幾座是專 供停車使用而新建?那幾座是建物附 設,因應洽公民眾使用?這兩種類型 的停車場,性質是不一樣的,評估選 擇的時間與地點也就不一樣,亦成為 將來營業能不能有盈餘的重要因素。 三、現在有很多的公共設備都是公辦民營 的方式,由民間經營,有些是比較好 ,有些則不一定,14 座立體停車場 是不是有公辦民營的計畫? 四、如何界定立體停車場是政府機關服務 性的事業,因為如果是救濟性事業, 政府不應該去賺錢,但基本上立體停 車場不是救濟性事業而是服務性事業 ,至少要損益平衡。 五、14 座立體停車場中,凱旋醫院晚上 應會有看病停車需求,應該會有人使 用,請說明該醫院停車場之屬性。 六、請工務局對於14 座立體停車場建置 起因、經費來源及分配比例說明。 沈委員美真 一、目前高雄市14 座立體停車場中,只 有3 座有盈餘,其餘均為虧損,虧損 的原因為何?有無開源節流的措施? 二、美術館立體停車場民國76 年有整體 規劃,似至91 年才有細部規劃,76 年當時認為需要250 格停車位,可是 至91 年的時候,停車空間已經足夠 ,為什麼還要再興建呢?97 年開始 營運,結果變成1 年虧損約700 餘萬 ,當時規劃的原因為何? 三、高雄市98 年預計新建的停車場有8 處,該8 處新建的停車場如何規劃? 時間、地點的問題如何去評估?需求 量的評估結果為何?應以立體停車場 案例針對虧損的原因作檢討、彌補及 避免虧損情況繼續發生。 四、停車場使用率高低跟營收具有因果關 係,使用率可經由統計計算,在某個 收費標準可以算出一個最大的收益, 費率訂定與最大收益是否曾經評估過?
監察院公報【第2653 期】 ‧102‧ 貳、巡察經濟不景氣衍生就業、就學及社會 福利救助問題之因應措施 趙委員榮耀 一、全球經濟情勢的惡化,對台灣的衝擊 也相當大,沈委員一向對弱勢的關懷 不遺餘力,為了更深入了解高雄市的 情況,也在昨天晚上跟一些社團負責 人、國中小校長進行座談;而本人長 期在監察院教育委員會,對弱勢學子 包括新台灣之子的就學問題很關心, 更能感受人數的明顯增加。 二、高雄市老人居家服務每月2 小時的服 務時數是否太少?似應由社區福利中 心做資源整合。另去年社福團體曾來 監察院陳情,因中央補助社會弱勢團 體經費常遭地方政府先行挪用,且撥 款時間冗長,經常造成弱勢團體財務 困難,高雄市有無此種情形? 三、南部失業率偏高,而目前經濟景氣變 動激烈,最好每個月統計失業率,且 宜有一客觀標準做全國性比較。又失 業勞工補助與社政救助措施會不會有 重疊之情形? 四、高雄市補助私立國中學雜費標準與一 般市立國中有何不同?有些私立國中 學生家境不錯,是否仍需補助?另國 中小營養午餐97 年第2 學期較第1 學期增加50%,為何經費成長了3 倍? 五、社會救助是未來政府施政需重視課題 ,希望高雄市能聚焦在資源系統的整 合上,涵蓋社政、教育及勞政等層面 ,使民眾能清楚知道社會救助訊息, 及得到政府應有的協助救濟,以保障 經濟弱勢民眾權益。 沈委員美真 一、上次來高雄市巡察時曾拜訪慈善團體 聯合協會,昨天晚上也邀集高雄縣市 慈善團體聯合會代表及國中小校長代 表進行座談,大致上來看高雄市其實 做的不錯,只是與會者有人反應不清 楚資源在那裡,或許可以考慮設立單 一窗口,充分整合各單位的資訊及資 源。 二、高雄市可以進一步透過老師的家庭訪 視等方式,瞭解弱勢家庭以及需要協 助者在那裡,目前,似乎社政、教育 、勞政各自為政,應該透過諸如資源 網絡圖的方式加以整合,且能夠有一 個互通訊息的機制,使急需協助的人 得到及時幫助。 三、內政部南區兒童之家附近學區國中、 小學的輔導老師不是很足夠,教育局 應該多點協助,並且透過老師家庭訪 問,發掘隱性人口,對就學困難學童 ,予以即時救助。 四、高雄市低收入戶、中低收入戶的申請 資格為何?教育局針對失學學生如何 給予協助? 五、經濟不景氣所衍生的新貧或失業人口 ,急需政府的各項補助資訊,如在就 業服務站可主動提供相關局處的整合 資訊,建議設計一張涵蓋社政、勞政 、教育等協助之流程表及資源網絡圖 ,使訊息能全面流通。 參、巡察國宅業務 趙委員榮耀 一、都市發展局洪副局長對國宅政策之變 革,及國宅社區促銷任務、策略活化 運用等有詳實報告,充分瞭解國宅社 區之概況,且市府對於弱勢及低收入 者提供國宅配套銷售,業績不錯,值
監察院公報【第2653 期】 ‧103‧ 得肯定。 二、滯銷國宅工程規劃及興建常見的通病 ,如市場資訊掌握未精準、興建地點 不佳、計價作業緩慢(長達2~4 年 )等,致時空變化大,衍生後續銷售 課題。高雄市國宅銷售績效日趨良好 應予肯定,政府雖不與民爭利,但仍 應考量收支平衡,高雄市目前收支情 況為何? 三、請說明高雄市98 年度短期內銷售 108 戶國宅之策略方案?另54 處國 宅社區之興建單位為何?有多少比例 為市府自建? 沈委員美真 一、業界常言:「沒有賣不出得房子,只 有賣不出的價錢。」可知降價措施亦 為促銷之良方,可藉由減少閒置空屋 之相關墊款利息、管理費用等成本支 出,以彌補折扣空間。 二、高雄市促銷手法繁多,但委外銷售不 成功原因應妥為探究,且國宅出售非 唯一處理方式;另時值景氣低迷,失 業率高,亦可考量出租之可行性,以 減少民眾居住負擔。 三、建議針對社區特性,善用政府其他資 源結合,提供弱勢族群駐點服務與社 工、學校等福利措施,以提升居住品 質,改善國宅形象。 四、社會人口已有老化現象,老人住宅未 來也是待解決之問題之一,高雄市尚 有5 筆國宅空地,是否將來有可能考 量預為規劃老人住宅等業務?
二、本院97 年度地方巡察第3 組報告 (台北縣) 巡察委員:趙委員昌平、陳委員健民 巡察機關或巡察地區:台北縣 巡察時間:98 年3 月25 日 巡察經過: 台北縣淡水河北側沿河平面道路工程 一、當日先到淡水鎮公所聽取台北縣政府交 通局長對該工程之計畫說明簡報,並受 理民眾陳情。反對和支持興建該道路雙 方紛紛表示意見,場面熱烈,兩位委員 提出規劃過程比施工更應審慎及替代道 路在台2 線拓寬後,要如何處理等議題 ,供該府參考;復要求該府做好交通、 環保與文化的平衡考量,並表達對兩方 意見的重視,強調仍應依法行政。 二、該計畫道路主要沿淡水河右岸紅樹林至 竹圍路段,全長4.7km。本次至捷運紅 樹林站現勘,實地瞭解視察該工程規劃 路線及對紅樹林生態之影響。 三、接見人民陳情12 人;接受人民書狀4 件。 巡察委員發言紀要: 趙委員昌平: 一、 臺北市政府對貴府有不同意見,也許是 考慮將來道路銜接的問題,建構交通網 路是希望將來能顧及整體發展,不是僅 有解決這一段交通問題,需考量交通整 體性的發展。 二、 本道路全長4.7 公里,依法令規定5 公 里以上須作環評,本案是否有作環評? 又本道路原規劃即為4.7 公里,抑或為 了避開環評而將之縮短成4.7 公里? 三、 是否已完成遺址調查?其遺址是否位於 規劃路線上? 四、 如規劃路線上確有文化遺址,路線是否 需要變更? 五、 本案已規劃完成,但文化遺址調查仍未
監察院公報【第2653 期】 ‧104‧ 完成,日本通常是在規劃、研究、探測 、履勘等整體評估完成後再施工,本案 文化遺址調查尚未完成,若挖掘發現屬 非常重要遺跡,文化遺址不能擾動,整 個工程需作變更,路線也與之前的規劃 背道而馳,建議加速文化遺址挖掘調查 ,作完整妥善規劃後再施工。 陳委員健民: 一、 除了貴府所規劃的方案外,若文化遺址 的問題存在,是否有其他的替代方案? 貴府在交通、環保、文化如何取得平衡 是不容易的事情,但是也是必須考慮的 事情。 二、 媒體報導蕭副總統指示成立專案小組, 貴府和交通部如何分工配合? 三、 本案是作為台2 線拓寬工程期間交通疏 導的替代性道路,是否表示未來台2 線 拓寬完成後本道路需撤除?工程作法是 否與一般道路興建方法有所不同?
三、本院97 年度地方巡察第9 組報告 (屏東縣) 巡察委員:李炳南、杜善良 巡察機關或巡察地區:屏東縣 巡察時間:98 年4 月2 日至98 年4 月3 日 巡察經過: 一、本院97 年度第2 次地方機關巡察第9 組,杜委員善良、李委員炳南,於本( 98)年4 月2 日、3 日赴屏東縣巡察。 2 日上午於屏東縣政府陳情中心受理民 眾陳情。當日下午實地巡察萬年溪整治 工程,並聽取簡報,瞭解萬年溪整治工 程辦理情形。 二、98 年4 月3 日實地視察潮州民治溪( 綠溪)工程、聽取簡報及實地勘查屏東 至潮州段鐵路高架化工程、聽取簡報, 以瞭解未來該府建設規劃方向,並就相 關問題作廣泛之討論,對後續工程進度 相關問題加以溝通討論。 三、接見人民陳情15 人;接受人民書狀10 件。 巡察委員發言紀要: 壹、巡察屏東縣萬年溪整治工程計畫發言紀 要: 一、李委員炳南: 首先,對於縣長主持屏東縣政感到敬 佩,是一個不容易的工作。上次來屏 東拜訪時,看過施政資料後,院裡已 向環保署表示關心,有個問題要請縣 府補充說明。有些工程已開工,甚至 進度超前,但只有第三個工程尚未開 工,是不是有什麼問題,會不會妨礙 到整體工程,請說明。 屏東縣曹縣長啟鴻: 萬年溪曾經是中央和地方合作要加蓋 的工程,之前由住都局補助,屏東差 點從此看不到這條河川。但深入了解 後,因當初沒有汙水下水道工程,而 且沒有高速公路,才會有加蓋的想法 ,現在已經有高速公路,屏東不會塞 車了,且營建署重視污水下水道工程 ,所以有機會讓萬年溪乾淨了,所以 要努力解決水源,現在水源部份也已 經解決了,但是當初環保署答應要給 3.3 億元,現在只補助1.6 億元。環 保署說法是水岸的部份不予補助,其 他的部分到去年年底才核定補助,到 營建署報告後才核定補助2 億元,再 加上議會沒有通過墊付,以致於工程 一直延宕,不得不等到6 月追加減預 算後才編入預算。我們已將萬年溪計
監察院公報【第2653 期】 ‧105‧ 劃送至營建署,提報臺灣城鄉新風貌 整體規劃示範計畫競爭型補助計畫爭 取到2 億元經費,並於98 年先行補 助4000 萬元,希望環保署可以依照 當時答應的經費補助,早日達成萬年 溪整體整治的目標。 二、杜委員善良: 97 年度萬年溪整治計畫工程到97 年 11 月才核定,可能因為經費補助問 題,但是也慶幸在營建署提報臺灣城 鄉新風貌整體規劃示範計畫競爭型補 助計畫可以爭取到2 億元經費。整個 計畫需要多少經費,後面的經費有沒 有困難,需要向哪幾個單位爭取經費 ,除了7 期之外還有沒有其他工程? 是否會影響屏東淹水?期程到什麼時 候可以完成,需要監察院協助的部份 ,希望藉這個機會了解。 屏東縣曹縣長啟鴻: 去年豪大雨來時萬年溪沿岸並沒有淹 水情形,在橋墩打除後增加通水斷面 ,更沒有淹水問題。環保署去年核定 3.3 億時已經刪除一些橋樑方面的工 程,並非3.3 億可以完成整體治理計 畫,1.4 億加上2 億可以將水岸河道 整治及水環境初步完成,再結合鐵路 高架化後,可形成綠帶和藍帶的結合 ,因為經費尚不足,希望可以先完成 水質及沿岸的整治,讓民眾看到政府 的努力。 三、杜委員善良: 希望提報整體計畫,並分別提列中央 補助相關部門,以利分別向中央申請 補助經費。 貳、巡察屏東縣潮州民治溪工程計畫發言紀 要: 一、李委員炳南: 在潮州地區鐵路高架化後,潮州地區 整體都會區發展,勢必更加蓬勃,是 具有潛力之都會區,地方鄉鎮首長素 質漸漸提高後,應能使潮州都會區發 展更加完整,使民治溪邁向塞納河之 目標。 二、杜委員善良: 整體民治溪工程共規劃幾年完成?總 體經費需求多少?本案在屏東縣政府 推薦下,予以實地勘查,希望每個工 程都在整體規劃設計及工程施作下, 逐步完成。 屏東縣潮州鎮公所李鎮長光明: 該縣民治溪整體工程於民國95 年規 劃預計分三年三期完成,計畫總經費 為8352 萬元,因應鄉鎮財源短絀, 計畫經費多為中央政府依提報計畫補 助,現階段共計實施四期,分別為第 一期行政院農業委員會水土保持局補 助840 萬元,第二期內政部營建署補 助540 萬元,第三期內政部營建署補 助1312.5 萬元,第四期內政部營建 署(擴大內需)補助1000 萬元,合 計四期補助3692.5 萬元辦理。 三、杜委員善良: 民治溪第五期經費總計1280 萬元, 經費來源為何?是否有地方政府配合 款? 潮州鎮公所李鎮長光明: 民治溪第五期經費總計1280 萬元, 係內政部營建署以既有市區道路人行 計畫改善補助公所1152 萬元,並由 公所配合10%預算計128 萬元,合 計計畫總經費1280 萬元。 四、李委員炳南:
監察院公報【第2653 期】 ‧106‧ 有關民治溪水質、及上游污泥處理問 題,是否有相關實施計畫,例如屏東 市萬年溪整治等? 潮州鎮公所李鎮長光明: 有關民治溪計畫區域內之污泥清理及 水質改善,已有屏東縣政府補助民治 溪清淤計畫,將在民治溪河床設置跌 水設施,以改善水質。 屏東縣研考室鄞處長鳳蘭: 希望於勘查結束後,委員能協助在中 央爭取補助民治溪第六期工程計畫經 費1200 萬元,期使民治溪早日完成 階段性計畫。 參、巡察屏東至潮州段鐵路高架化工程計畫 發言紀要: 一、李委員炳南: 臺鐵屏東-潮州捷運化建設計畫之執 行對於現有屏東至潮州鐵路高架化及 雙軌電氣化後,對臺鐵營運及屏東縣 市發展助益頗大,請主辦機關鐵工局 南部工程處盡力使工程順利進行並如 期完工。 交通部鐡路改建工程局南工處伍處長 勝園: 感謝屏東縣政府協助鐵工局辦理臺鐵 屏東至潮州鐵路高架化工程,本路段 全線改建完成後將消除24 處平交道 及潮州車站將無前、後站之分,除能 提昇屏東縣市交通便捷、改善鐵路交 通事故外,亦有助於都市平衡發展並 帶動地區觀光事業及促進商業繁榮。 二、李委員炳南: 潮州基地附近養魚池抽水是否影響地 基沈陷?新建潮州車站是否含綠建築 規劃及省能源高科技節能設施等(如 太陽能集電)? 交通部鐡路改建工程局南工處伍處長 勝園: 潮州基地目前尚無地基沈陷影響並規 劃以土方預壓使日後鐵道及建物基盤 結構穩固;另新建站體細設已包含綠 建築設施無虞,諸如太陽能集電科技 省能設備可予補增。 三、杜委員善良: 屏潮計畫工期至民國100 年,工進時 程如何控管?高鐵是否延至潮州?若 是,潮州站場如何配合辦理? 交通部鐡路改建工程局南工處伍處長 勝園: 屏東至潮州計畫原工期至民國100 年 6 月因高架部份辦理新耐震規範修正 ,預估報(交通)部奉准後工期延至 103 年6 月;另該路高架及潮州站場 主係改建鐵路原線及增設站體,俾符 臺鐵日後提昇旅運並帶動都市發展, 故原細設規劃並未預留高鐵轉運需求。 移委員會處理事項:無
***************** 監察法規 ***************** 一、訂定「監察院核准罰鍰分期繳納 作業要點」 監察院 函 發文日期:中華民國98 年4 月30 日 發文字號:(98)院台申參字第0981802091 號
主旨:訂定「監察院核准罰鍰分期繳納作業 要點」乙種如附件,請 查照。 院長 王建煊
監察院公報【第2653 期】 ‧107‧ 監察院核准罰鍰分期繳納作業要點 一、監察院(以下簡稱本院)為辦理公職人 員財產申報法、公職人員利益衝突迴避 法、政治獻金法及遊說法所規定罰鍰事 件之分期繳納事宜,特訂定本要點。 二、罰鍰繳納義務人有下列情形之一者,本 院得依職權並審酌義務人之申請,准予 分期繳納罰鍰金額: (一)義務人依其經濟狀況,無法一次完 納罰鍰金額者。 (二)因天災、事變,致義務人遭受重大 財產損失,無法一次完納罰鍰金額 者。 (三)其他因重大或不能歸責義務人之特 殊事由,無法一次完納罰鍰金額者。 三、義務人申請分期繳納罰鍰金額時,應敘 明理由並檢具相關證明文件憑核。 四、核准分期繳納罰鍰之期數,得依下列標 準辦理: (一)罰鍰金額未滿新臺幣五十萬元者: 二至二十四期。 (二)罰鍰金額在新臺幣五十萬元以上, 未滿新臺幣一百萬元者:二至三十 六期。 (三)罰鍰金額在新臺幣一百萬元以上者 :二至四十八期。 依一定之事實,足認其情形特殊,如依 前項各款之最高期數標準予分期繳納仍 無法完納,而有延長期數之必要者,得 依前項規定專案簽請秘書長核定後辦理 。但最高不得超過四十八期。 前二項所稱之分期,每一期為一個月。 五、經核准分期繳納,而未依期限繳納,或 有任何一期票據未獲兌現者,本院得廢 止其分期繳納之核准,義務人應於收到 廢止通知後七日內一次繳清餘款;屆期 仍未繳清者逕送強制執行。 六、本院核准分期繳納時,應注意不得逾行 政執行法第七條規定之執行期間。 七、本要點奉核定後實施,修正時亦同。
二、修正「公職人員財產申報資料審 核及查閱辦法」 行政院、考試院、監察院 令 發文日期:中華民國98 年5 月15 日 發文字號:院臺法字第0980024710 號令、考 臺組貳一字第09800034031 號令 、(98)院台申參字第0981801856 號令
修正「公職人員財產申報資料審核及查閱辦 法」 附修正「公職人員財產申報資料審核及查 閱辦法」 院長 劉兆玄 院長 關 中 院長 王建煊 公職人員財產申報資料審核及查閱辦法修正 條文 第 一 條 本辦法依公職人員財產申報 法(以下稱本法)第六條第三項 及第十一條第一項規定訂定之。 第 二 條 公職人員或公職候選人(以 下稱申報人)申報財產,應依規 定格式詳實填寫財產申報表(以 下稱申報表),並簽名或蓋章後 ,提出於該管受理申報機關(構 )。 受理申報機關(構)採網路 申報方式者,申報人之簽名或蓋
監察院公報【第2653 期】 ‧108‧ 章,以可資辨別申報人身分之電 子簽章代之。 受理申報機關(構)於受理 申報人之申報表後,應製發收據 予申報人,並載明受理日期。但 採網路申報方式者,不在此限。 第 三 條 申報人提出之申報表不符規 定格式者,受理申報機關(構) 應不予受理。 第 四 條 申報人逾規定期限申報者, 受理申報機關(構)仍應受理。 第 五 條 受理申報機關(構)受理申 報後,除採網路申報方式者外, 應就下列各款項目為形式審核: 一、基本資料應填寫完整, 信託申報者,應檢附相 關文件。 二、增、刪、塗改處應蓋章 或簽名,手寫申報者, 字跡應清晰。 三、申報人應於申報表首頁 填寫申報日,並於末頁 簽名或蓋章。 四、欄位空白處應填載「總 申報筆數:零筆」。 申報人提出之申報表不合前 項各款規定者,應通知其限期補 正。申報人逾期不為補正者,受 理申報機關(構)應製作書面紀 錄留存。 第 六 條 申報人於申報後發現申報資 料錯誤時,得重新詳實填寫申報 表,提出於原受理申報機關(構 )申請更正,原申報表不得抽換 ;其採網路申報方式者,得自行 更正後重新上傳申報資料。 第 七 條 本法第十一條第一項所稱個 案之查核,指具有下列各款情形 之一者: 一、陳情或檢舉人以書面或 言詞敘明申報人之姓名 ,且指明其申報不實或 涉有貪瀆之情事。 二、申報人生活與消費顯超 過其薪資收入。 三、其他事證足認申報人有 申報不實或貪瀆之嫌疑。 本法第十一條第一項所稱一 定比例之查核,指申報年度申報 總人數百分之五以上。 受理申報機關(構)進行一 定比例之查核時,應以抽籤前之 財產申報資料為準。 第 八 條 受理申報機關(構)進行本 法之查核時,除得依法向有關機 關(構)、團體或個人查詢外, 應予申報人陳述意見之機會。受 理申報機關(構)之上級政風機 關(構)複核時,亦同。 申報人得以書面或口頭陳述 意見;以口頭陳述意見者,受理 申報機關(構)應製作書面紀錄 ,並由申報人簽名或蓋章。 第 九 條 受理申報機關(構)對於前 二條查核結果,應留有完整之紀 錄。 第 十 條 受理申報機關(構)認申報 人非故意申報不實者,應將查核 後之正確財產資料對照表附於原 申報表,並通知申報人。 受理申報機關(構)認申報 人非故意未予信託者,應通知申
監察院公報【第2653 期】 ‧109‧ 報人限期信託並申報。 申報人於接獲第一項通知後 ,如發現有錯誤者,應即檢具正 確財產資料之證明,申請受理申 報機關(構)更正。 第 十一 條 受理申報機關(構)為政風 機關(構)時,其所屬機關首長 、副首長之財產申報資料由上級 政風機關(構)查核及處理;無 上級政風機關(構)者,移由法 務部查核及處理。 第 十二 條 受理申報機關(構)於本法 第六條第一項所定期限內,依第 五條規定完成形式審核後,應按 申報人所申報之資料,彙整每人 一冊,編號保存。 受理申報機關(構)就前項 資料,應影(列)印加蓋與原本 相符之章戳,列冊供人查閱。 受理申報機關(構)於申請 人申請查閱時,應遮蓋申報人及 其配偶與未成年子女之國民身分 證統一編號(中華民國居留證號 )、通訊及戶籍地址、聯絡電話 、門牌號碼或汽車牌照等資料。 第 十三 條 查閱申報人申報之財產資料 者,應填具申請書向受理申報機 關(構)申請,受理申報機關 (構)非有正當理由,不得拒絕。 前項申請查閱之人,以中華 民國國民年滿二十歲者為限。 第一項之申請書應記載下列 事項,經申請人簽名具結後,交 受理申報機關(構)保存: 一、申請人之姓名、住所及 國民身分證統一編號。 二、查閱申報資料之目的。 三、申請人表明對於查閱之 資料絕不供為營利、徵 信、募款或其他不正當 目的之使用。 第 十四 條 受理申報機關(構)於收到 申請書後,經審核合於規定者, 應指定查閱時間、場所,通知申 請人到場查閱。 前項通知,得以電話為之, 並應製作書面紀錄留存。 第 十五 條 申請人應親自到場查閱,不 得委任他人為之。 申請人到場查閱時,應先出 示其身分證明。 第 十六 條 查閱資料應於受理申報機關 (構)指定之場所為之,並僅得 閱覽。其應遵守事項如下: 一、不得將資料攜出場外。 二、不得抄錄、攝影、影印。 三、對於查閱之資料不得填 註、塗改、更換、抽取 、圈點或污損。 四、裝訂之資料不得拆散。 五、不得有其他影響資料完 整或場所秩序之行為。 查閱人如有前項各款行為之 一而涉及刑事責任者,受理申報 機關(構)應依法函請該管檢察 機關偵辦。 第 十七 條 申請人對同一申報人申報之 資料,每年以查閱一次為限。 第 十八 條 申請人一次以申請查閱一人 之申報資料為限。 第 十九 條 受理申報機關(構)於申請 人查閱資料時應指派專人在場。
監察院公報【第2653 期】 ‧110‧ 第 二十 條 受理申報機關(構)應置查 閱登記簿,登載查閱人及查閱相 關事項。 第二十一條 本辦法自中華民國九十七年 十月一日施行。
************************** 公務員懲戒委員會議決書 ************************** 一、公務員懲戒委員會對本院所提: 交通部臺中港務局前局長黃清藤 因違法失職案件,依法彈劾案之 議決書(彈劾案文見本院公報第2492 期) 公務員懲戒委員會議決書 98 年度鑑字第11397 號 被付懲戒人 黃清藤 交通部臺中港務局前局長(已死亡) 男性 上列被付懲戒人因違法失職案件經監察院送 請審議本會議決如下 主文 本件關於黃清藤部分不受理。 理由 被付懲戒人黃清藤原係交通部臺中港務局局 長,該局於86、87 年間辦理廢料絞碎機等 設備之採購,被付懲戒人涉有違失,經監察 院彈劾送會審議。第查被付懲戒人所涉刑事 部分,經臺灣臺中地方法院檢察署檢察官依 貪污罪嫌提起公訴,並經一、二審法院為有 罪之判決,被付懲戒人不服判決上訴最高法 院後,於98 年2 月3 日死亡,最高法院因 於98 年3 月26 日以98 年度台上字第1703 號刑事判決,將原審及第一審關於被付懲戒 人罪刑部分之判決撤銷,改判被付懲戒人公 訴不受理,確定在案,此有該刑事判決附卷 可稽。被付懲戒人黃清藤既已死亡,依公務 員懲戒法第26 條第2 款規定,自應為不受 理之議決,爰為議決如主文。
二、公務員懲戒委員會對本院所提: 經濟部水利署河川勘測隊正工程 司周世杰因違法案件,依法彈劾 案之議決書(彈劾案文見本院公報第 2631 期) 公務員懲戒委員會議決書 98 年度鑑字第11398 號 被付懲戒人 周世杰 經濟部水利署河川勘測隊正工程司 男性 年58 歲 上列被付懲戒人因違法案件經監察院送請審 議本會議決如下 主文 周世杰降貳級改敘。 事實 甲、監察院彈劾意旨略以: 壹、案由:經濟部水利署河川勘測隊正工程 司周世杰,多次接受承攬水利署第三河 川局工程採購案之廠商招待,出入有女 陪侍之理容KTV,召女陪酒作樂,涉 足不正當場所,嚴重敗壞法紀,損害公 務員形象,爰依法提案彈劾。 貳、違法失職之事實與證據:(略) 參、彈劾理由及適用之法律條款:(略) 肆、證據(附件1 至附件7,均影本附卷)
監察院公報【第2653 期】 ‧111‧ :附件1~附件7 省略 乙、被付懲戒人申辯意旨: 壹、現職業務職責與工程業務無涉說明: 申辯人現職為經濟部水利署河川勘測隊 正工程司,業務職掌主要為勘測劃定河 川、海堤區域及排水設施範圍等,工作 上除必須出勤赴河川勘測隊苗栗分隊綜 理隊務外,更需親赴現場依初步劃定成 果逐段校核。現職與工程之推動(設計 、發包、監工、驗收等)完全無涉,事 實上申辯人服務公職自民國64 年以來 ,早期均從事水利規劃相關業務,未曾 參與工程相關業務,亦與相關工程界從 無交往;自民國88 年至93 年任職水利 署第二河川局管理課長,負責河川管理 工作亦未參與工程相關業務。本次監察 院彈劾案文參、違法失職之事實與證據 ,申辯人所涉違失情形(彈劾案文第4 頁)「於系爭工程施工期間,前往…特 種營業場所…」,文內所指系爭工程( 大甲溪砂石運輸便道工程及頭汴坑溪防 災減災工程)與申辯人業務職掌毫無任 何關係,容先敘明。 貳、先前曾遭受貴委員會懲戒案及本次違失 涉足不正當場所原由說明: 申辯人前曾任職經濟部水利署第二河川 局正工程司兼管理課長(民國88 年~ 93 年),許哲彥時任第二河川局局長 (民國89 年~92 年),期間因辦理「 苗栗縣後龍溪上游段土石標售計畫」, 民國91 年得標承商因遭質疑超挖,申 辯人與局長許哲彥等均遭移送司法涉訟 。該案申辯人雖積極作為,諸如(一) 主動洽請測量人員檢測(二)依據檢測 成果處分承商,包括(1)依合約書規 定罰款(2)限令停工改善(3)函送公 共工程委員會將承商處以停權(4)接 洽法務部行政執行處代為執行行政罰款 (5)提起民事訴訟等,司法部分並經 一、二審法官查明審理判決無罪定讞( 民國97 年),惟行政處理未被貴委員 會接受,以無積極作為怠忽職責議決處 分降壹級改敘。事實上案發之後,因後 續作為均需等待實地檢測據以計算承商 超挖數量與面積,方可依相關法令處理 ,並非「不積極處理」。申辯人以該案 雖自認清白,亦無與廠商飲宴違法失職 等情事,惟所督導計畫遭受質疑且經起 訴,對機關聲譽造成負面影響,自我檢 討仍勉強虛心接受懲戒未再申訴。 前揭「土石標售案」後,許局長於92 年調回水利署,後又出任第三河川局局 長,申辯人則因受訟累身心煎熬,乃於 93 年報名自願請調回水利署河川勘測 隊任職迄今。兩人己在不同單位,業務 上雖無關聯,惟仍屬長官部屬情誼,更 因該「土石標售案」尚在司法機關審理 ,確有因審理庭召開前後需見面商討案 情,故其邀約時(並非廠商邀約)未加 深慮即前往約定場所餐敘,並在特殊情 境下參與了部分前往理容KTV 之不當 行為(申辯人多次與許局長唔談後餐畢 先行離席,並無全程參與,此可以兩人 前去次數不同佐證),但原出發點動機 與目的確實是為討論「土石標售案」之 案情及長官邀約敘舊,而與所指工程業 務完全無涉。 參、違失涉足不正當場所之次數說明: 本案有關刑責部分,申辯人在臺中市調 查站及檢察官訊問時均已陳明,確實與 工程無關,經調查屬實故未被提起公訴 。惟行政違失述及申辯人曾去理容
監察院公報【第2653 期】 ‧112‧ KTV6 次,因起訴書所載係調查員依據 通聯記錄判定,實際情形是申辯人勘測 工作性質屬外業(長駐苗栗隊或赴現場 ),故即使彼此縱有連絡但不可能想去 就能去,有些則是他人之陳述,此在調 查站約談時已陳述。就申辯人記憶所及 ,去的次數應無6 次之多,記憶中約有 2-3 次(如96 年10 月8 日、97 年1 月 7 日確定沒去,97 年2 月12 日與97 年 3 月3 日是在調查站聽監聽記錄而作陳 述),實際上申辯人多次在類似邀約時 ,均在電話連繫中先佯予應允,惟實際 並未前往以為推托,故所載次數就記憶 所及實有出入。參與前往邀約,確如前 述,乃是與同事老長官討論事情與敘舊 ,而全與工程相關業務無關。 綜上所述,申辯人因涉「後龍溪上游土 石標售計畫」訟累,且因與許局長共事 情誼,基於討論案情與敘舊,違失涉及 不當場所違背公務員服務法規定仍屬犯 錯,深感愧疚,後悔不已。 申辯人自民國64 年服務公職迄今,在 工作崗位上自忖戮力作為,也曾完成多 件上級交付之重大計畫(如現今施工中 之湖山水庫即係由申辯人率隊完成可行 性規劃),且自民國91 年涉訟後,雖 身心俱疲,但於93 年返回任職水利署 河川勘測隊之四年期間,亦努力完成 10 餘件之勘測劃定計畫,且經經濟部 據以公告在案。 本案違失涉足不當場所受彈劾前已經水 利署考績會決議將記一大過處分,申辯 人已記取教訓深感悔悟,自我警惕當更 加謹言慎行,謹將實情報告如上,尚祈 貴委員會明鑒體恤申辯人30 餘年之努 力,予申辯人待罪自新立功機會,申辯 人當記取教訓並在工作上貢獻所學戮力 以赴。 丙、監察院原提案委員對於被付懲戒人申辯 意旨之意見: 一、本案被付懲戒人經濟部水利署河川勘 測隊正工程司周世杰,多次接受承攬 第三河川局工程採購案之廠商招待, 出入有女陪侍之理容KTV,召女陪 酒作樂,涉足不正當場所,嚴重敗壞 法紀,損害公務員形象,違反公務員 服務法第1 條、第5 條、第10 條及 第21 條之規定,業經本院彈劾在案。 二、被付懲戒人申辯內容係對檢察官起訴 書所載事項提出答辯。而本院彈劾案 文所指涉足不正當場所之行政違失事 實,為被付懲戒人所不爭,且被付懲 戒人等亦自承違反公務員服務法之規 定,及傷害公務員與機關之形象等情。 三、綜上,被付懲戒人之違失事證,本院 彈劾案文業已指證歷歷,其違反公務 員服務法之規定,至為灼然。爰仍請 公務員懲戒委員會依法懲戒,以肅官 箴。 理由 監察院彈劾意旨略以:被付懲戒人周世杰( 另案經本會97 年度鑑字第11116 號議決降 壹級改敘),係經濟部水利署河川勘測隊正 工程司。經濟部水利署第三河川局,96 年 辦理「大甲溪砂石運輸便道工程-第三標」 及「頭汴坑溪一江橋上游崩塌段至內城橋河 段防災減災工程」2 案,第三河川局及該署 部分承辦人員接受承商「川順營造股份有限 公司」(下稱川順公司)招待,出入有女侍 陪酒之理容KTV,召女陪酒作樂,涉足不 正當場所。被付懲戒人亦多次接受承攬廠商
監察院公報【第2653 期】 ‧113‧ 招待,出入有女陪侍之理容KTV,召女陪 酒作樂,涉足不正當場所,嚴重敗壞法紀, 損害公務員形象,爰依法提案彈劾。茲依彈 劾書所列事實,審議如下: 彈劾意旨指被付懲戒人,係經濟部水利署河 川勘測隊正工程司,於前開工程施工期間, 前往有女陪侍之理容KTV 特種營業場所, 召女陪侍,飲酒作樂,共計有6 次:即96 年8 月15 日、96 年9 月18 日、96 年10 月 8 日、97 年2 月12 日、97 年3 月3 日、97 年3 月17 日。 一、經查被付懲戒人確於96 年8 月15 日, 96 年9 月18 日及97 年3 月17 日分別 應同案另被付懲戒人許哲彥、葉奕匡之 邀,赴有女陪侍之理容KTV,召女陪 侍飲酒作樂之事實,業據被付懲戒人分 別在監察院詢問,及經濟部水利署政風 室訪談時,承認屬實,有監察院調查案 件詢問筆錄,及經濟部水利署政風室訪 談紀錄在卷可據,核與其在本會調查時 ,供稱去過2、3 次之情節相符,其違 法事實應堪認定。被付懲戒人雖復稱日 期不敢確定云云,核與被付懲戒人在監 察院詢問,及在上開政風室訪談時所做 明確之陳述不符,自非可採。被付懲戒 人申辯意旨另稱:前往理容KTV,係 受許哲彥之邀,因與許哲彥前涉「苗栗 縣後龍溪土石標售案」在法院審理中, 應邀去與許哲彥商討訴訟事宜,被付懲 戒人當時職務為經濟部水利署河川勘測 隊正工程司,職掌與第三河川局辦理前 述2 工程無關,經檢察官調查屬實,故 未提起公訴云云,被付懲戒人所為雖與 職務無關,惟其既受承商招待,在有女 陪侍之理容KTV 召女陪侍,飲酒作樂 ,行為有欠謹慎,所述並不能資為免責 之論據。被付懲戒人違法事證,已臻明 確。核其所為有違公務員服務法第5 條 所定,公務員應謹慎,不得有放蕩,足 以損失名譽之行為之旨,應依法酌情議 處。 二、彈劾意旨另指:依臺灣臺中地方法院檢 察署檢察官97 年度偵字第10922 號起 訴書記載,被付懲戒人尚於96 年10 月 8 日、97 年2 月12 日、97 年3 月3 日 ,受承商招待,在有女陪侍之理容 KTV,召女陪侍,飲酒作樂,亦有違失 云云。惟為被付懲戒人所否認,並稱上 開起訴書犯罪事實欄的記載,係依據調 查局電話通聯記錄而判定,被付懲戒人 從事勘測工作常在外地,縱有電話聯絡 ,也不可能前去,亦有在電話中先佯予 應允以為推託等語。查上開起訴書被付 懲戒人並未被起訴(按起訴之被告為同 案另被付懲戒人許哲彥、葉奕匡、林榮 紹),觀該起訴書並未記載被付懲戒人 有於97 年2 月12 日、97 年3 月3 日 前往理容KTV 受招待,召女飲酒作樂 之任何證據,此有該起訴書在卷可稽, 許哲彥、葉奕匡、林榮紹也從未敘述被 付懲戒人於這2 日有同被招待之事。證 人李幼綢於偵查中雖證明葉奕匡、林榮 紹於96 年10 月8 日在理容KTV 消費 ,並未證明被付懲戒人與葉奕匡、林榮 紹一同在場(起訴書第34 頁);雖其 又證稱被付懲戒人與許哲彥於96 年10 月8 日到理容KTV(起訴書23 頁), 惟起訴書並未認定許哲彥有於96 年10 月8 日偕被付懲戒人赴理容KTV,足 見證人李幼綢所證不實,並非可採。此 外又無其他任何證據可證明被付懲戒人 ,有於96 年10 月8 日、97 年2 月12
監察院公報【第2653 期】 ‧114‧ 日、97 年3 月3 日有彈劾意旨所指應 受懲戒之事實,自難認被付懲戒人有此 部分之違法行為,基於數違失行為懲戒 一體性之原則,此部分自無庸另為不受 懲戒之諭知,併此敘明。 據上論結,被付懲戒人周世杰有公務員懲戒 法第2 條第1 款情事,應受懲戒,爰依同法 第24 條前段、第9 條第1 項第3 款及第13 條議決如主文。
FD06141 | 2008_港澳台_香港_立法会_嘉禾大厦火灾后食物业消防安全规管_讨论文件.pdf
分类:06_境外及港澳台调查报告 | 年份:2008 | 地域:香港 | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
- 1 -
2013 年7 月9 日 討論文件 立法會食物安全及環境衞生事務委員會
就食物業處所遵行消防安全規定建議的措施
目的
本文件向委員簡介消防處和食物環境衞生署(食環署) 就確保食物業處所遵行消防安全規定建議的新措施。
背景
二零零八年在嘉禾大廈1發生的一場火警,令公眾關注 持牌處所的消防安全問題,尤其是招待大量市民的食物業處所 的消防安全問題。二零零九年六月,申訴專員就食物業處所的 消防安全規管措施主動展開調查。申訴專員在二零一零年五月 提交的報告中提出若干建議,其中兩項是關於消防處和食環署 監察食物業處所遵行消防安全規定的建議: (a) 食環署應在食物業牌照上訂明處所必須遵從消防安全 規定;以及
(b) 食環署應與消防處訂立機制,確保食物業處所符合消防 安全規定才批准續牌申請。
此外,效率促進組在二零一一年六月完成一項就消防處 的消防安全監管及相關管理事宜進行的管理研究,當中建議消 防處和有關部門考慮檢討食物業處所在申請暫准食物業牌照 (暫准牌照)時所須提供的符合消防安全規定的證明,以便消防 處人員查核及跟進。
由於普通食肆、小食食肆和工廠食堂提供座位間給公眾 人士在處所內進食,此類食肆的消防安全問題引起較大的關
1 旺角嘉禾大廈是一幢商住樓宇。嘉禾大廈在二零零八年八月十日發生一場火警, 需時達六小時才能救熄,並造成四人死亡。 立法會CB(2)1511/12-13(04)號文件
- 2 -
注。我們在推行建議措施以落實上文第2 段的有關建議時,會 先從這三類食物業處所的牌照着手。
食環署及消防處已訂定新措施(載於下文第6 至14 段),落實由申訴專員及效率促進組提出的建議。在經濟分析及 方便營商處協助下,食環署及消防處亦於二零一二年八月委託 外間顧問進行營商環境影響評估研究,檢視建議措施可能對業 界造成的影響。 建議的新措施
(a) 監察食物業牌照持續遵行消防安全規定的機制
根據《食物業規例》(第132X 章),除非申請食物業牌 照的處所履行相關政府部門(包括消防處)所發出的規定,否則 食環署不會批出食物業牌照。有關處所在獲發牌照後,必須時 刻遵行所有被施加的消防安全規定。
為確保普通食肆、小食食肆和工廠食堂持續遵行消防安 全規定,食環署會與消防處訂立監察機制處理違反消防安全規 定的情況,並會向這些處所持有的相關牌照明確施加以下持牌 條件︰
“持牌人須時刻遵行消防處處長發出的消防安全規定。”
根據建議的安排,有關處所遵行消防安全規定的情況, 會由一套與消防安全有關的警告信制度監察。違規情況會按相 關的火警風險分為嚴重和輕微兩類,處理方式亦會有所不同。 這項建議制度載於附件I。
嚴重違反消防安全規定,所帶來的火警危險會引致有關 處所(即普通食肆、小食食肆和工廠食堂)無法安全營業,不宜 招待顧客。當發現這類違規情況,消防處除會按其職權範圍採 取執法行動外,還會建議食環署根據《公眾衞生及市政條例》(第 132 章)第125(1)(b)條,即時暫時吊銷有關的食物業牌照。食環 署接獲有關建議後,會發信通知有關的持牌人立即暫停營業。 暫時吊銷牌照令的有效期會維持至食環署按照消防處的意見, 信納有關的火警危險已消除為止。
- 3 -
如屬輕微違反消防安全規定,經消防處通知後,食環署 會向持牌人發出警告信,要求持牌人在30 天內糾正違規事項。 如持牌人未有遵照食環署在六個月內連續發出的三封警告信作 出糾正,持牌人會被暫時吊銷牌照七天。其後,如持牌人在四 個月內仍然沒有遵照食環署再發出的兩封警告信作出糾正,其 牌照可被取消。如持牌人不遵行暫時吊銷牌照令,其牌照亦可 被取消。 (b) 確保有關處所在牌照獲續期前已符合消防安全規定
現時,普通食肆、小食食肆和工廠食堂的持牌人須根據 《消防(裝置及設備)規例》(第95B 章)和《附表所列處所通風設 施規例》(第132CE 章)聘用註冊消防裝置承辦商和註冊專門承 建商(通風系統工程類別),分別對有關處所的消防裝置及設備 和通風系統進行年檢。相關的註冊消防裝置承辦商和註冊專門 承建商(通風系統工程類別)須在完成有關處所的年檢後14 天 內,向消防處分別提交《消防裝置及設備證書》(FS 251 證書) 和《通風系統年檢證書》(年檢證書)。然而,現時食環署在處 理牌照續期申請的過程中,無須持牌人提供任何有關符合消防 安全規定的證明文件。
為確保普通食肆、小食食肆和工廠食堂每年在牌照續期 前已符合消防安全規定,我們建議在處理這三類食物業牌照的 續期申請時加入新的規定。新措施規定持牌人在牌照續期時必 須領有有效的FS 251 證書和年檢證書,其牌照才可獲續期。持 牌人如在牌照續期前未能向消防處提交有效的FS 251 證書和 年檢證書,其牌照不會獲食環署續期。這三類食物業牌照會施 加以下附加持牌條件:
“ 有關的食物業處所如在下一個牌照有效期開始當日並 無領有有效的《消防裝置及設備證書》(FS 251 證書)及 《通風系統年檢證書》(年檢證書),且未能在牌照期滿 日期前14 天或之前向消防處提交有效的文件以供審 核,食環署可拒絕其牌照續期申請。”
(c) 遵從消防安全規定才獲發暫准牌照
根據第132X 章第33C 條,食環署如信納處所已符合發 出暫准牌照須履行的各項發牌條件(包括消防安全規定),可發
- 4 -
出暫准牌照。當申請人通知食環署已履行發出暫准牌照須符合 的各項發牌條件時,應把根據《建築物條例》(第123 章) 註冊 的認可人士或註冊結構工程師以及註冊消防裝置承辦商核證的 《符合規定證明書C(消防規定)》(表格C)連同其他所需文件一 併提交食環署。在處理正式和暫准牌照申請時,如有關處所使 用聚氨酯泡沫塑料墊褥和襯墊家具,所施加的消防安全規定會 包括提交相關的發票和消防安全測試證明書。
我們建議對現行表格C 作出修訂,以方便申請人申報有 關處所有否使用聚氨酯泡沫塑料墊褥和襯墊家具,如有的話, 則提交相關的發票和測試證明書。 營商環境影響評估(營商環評)研究和業界諮詢
正如上文第五段提到,食環署和消防處曾於二零一二年 八月委託外間顧問公司進行營商環評研究。此外,食環署和消 防處在二零一二年九月和十月為有關的持牌人舉行了三場簡介 會,並為業界商會代表舉行了兩場業界諮詢會。顧問的主要研 究結果和建議的撮要載於附件II。
營商環評的研究結果顯示,業界相關人士普遍歡迎政府 為提高業界對消防安全問題的認識而提出的措施,並認為上述 建議措施(a)和(b)切實可行,也不會對其業務運作造成直接和重 大的影響。由於大廈的各項FS251 證書往往由業主而非食肆直 接擁有,業界人士對於取得大廈的各項FS251 證書的難度表示 關注。有見及此,消防處會自行從有關紀錄中查核大廈的各項 FS 251 證書。換言之,持牌人如提交牌照續期申請,只需要提 供其處所的FS251 證書,而無須提交整座大廈的各項FS 251 證書。
就上文的建議措施(c)而言,營商環評研究顯示,目前家 具供應商的一般做法是保留相關的發票和測試證明書直至食肆 負責人全部付清有關金額,因此申請人通常不會把發票和測試 證明書連同表格C 一併提交。為配合業界這一普遍做法而又不 影響消防安全,顧問建議對表格C 的條款和條件再作修訂,讓 消防處給予暫准牌照申請人六個星期寬限期,向消防處提交相 關的發票和測試證明書,前提是他們須在消防處的視察人員巡
- 5 -
查有關處所時(發出暫准牌照後七日內)出示有關家具的送貨 單。
食環署及消防處已接納顧問提出針對以上措施(c)的建 議。食環署及消防處信納有關建議是考慮到業界做法而釐定 的,並知悉相關的專業服務機構亦已確認寬限期的長短(六星期) 足以讓有關申請人取得並向消防處提交所需發票和測試證明 書。有關措施亦不會對其業務運作造成直接和重大的影響。 未來路向及實施時間表
食環署及消防處現正擬備有關措施的實施細節。當局計 劃於二零一四年首季推行這些建議措施。推行建議措施前,食 環署和消防處會印製小冊子,以提高業界對消防安全規定的認 識和了解時刻遵行消防安全規定的重要性,並為業界和註冊消 防裝置承辦商/註冊專門承建商(通風系統工程類別)舉行簡介 會。 徵詢意見
請委員備悉本文件內容,並提出意見。 食物及衞生局 食物環境衞生署 消防處 二零一三年七月
- 1 -
附件 I 違反消防安全規定的情況及其處理方法
為確保普通食肆/小食食肆/工廠食堂持續遵行消防處訂定的消 防安全規定,我們會設立監察機制,處理嚴重及輕微違反消防安全規定的 情況。
若在巡查過程中確認食肆/食堂沒有遵從超過一項主要消防安全 規定(載列於下文第4段),有關情況會視為「嚴重違反消防安全規定」。消防 處會建議食物環境衞生署(食環署)立即暫時吊銷有關的食物業牌照。
若在巡查過程中確認食肆/食堂沒有遵從
(a) 一項主要消防安全規定(載列於下文第4段);或
(b) 一項主要消防安全規定及任何數目的其他消防安全規定(載列於 下文第5段);或
(c) 任何數目的其他消防安全規定,
有關情況會視為「輕微違反消防安全規定」。消防處會通知食環署發出警告 信。
主要消防安全規定
主要消防安全規定如下: (a) 消防裝置及設備
以下設於食物業處所內的消防裝置及設備(若須按規定裝設的 話),必須保持在有效操作狀態:
自動花灑系統
消防栓/喉轆系統
自動煙霧偵測系統
排煙系統
手動火警警報系統
應急照明系統
2 -
如發現以上任何一項消防裝置及設備沒有保持在有效操作狀態, 均視為一項違規項目。
(b) 普通食肆/小食食肆/工廠食堂內所使用的燃料
食肆/食堂必須遵守有關處所內所使用燃料的消防安全規定。舉 例來說,食物業處所的廚房如位於地庫,便不得使用石油氣。
(c) 可開啟/打碎的窗戶
一般來說,預設可開啟/打碎的窗戶被阻塞的面積不得超過總面 積的百分之五十,或有關窗戶上半部分被阻塞的面積不得超過百 分之二十五。
其他消防安全規定
其他消防安全規定如下: (a) 其他消防裝置及設備
除上文第4(a)段所述的主要消防裝置及設備外,食物業處所內的其 他消防裝置及設備(例如:滅火筒)均須保持在有效操作狀態。
(b) 防火漆
所有用作假天花板、間隔或牆面裝飾的可燃物料,以及所有用作 布簾及窗簾的纖維,均須符合有關的國際消防安全標準。
(c) 吊門
傳菜窗口位的吊門的抗火時效,須符合有關的消防安全規定。
(d) 聚氨酯泡沫塑料襯墊家具
食物業處所內的聚氨酯泡沫塑料襯墊家具,以及用以覆蓋家具的 物料,均須符合有關的國際消防安全標準。
- 3 -
(e) 機械通風系統 食物業處所內的機械通風系統(包括防火閘)須符合有關的消防安 全規定。
(f) 由消防處發出的其他規定
食物業處所須遵守由消防處發出的任何其他消防安全規定。
以下範例說明如何就違反消防安全規定的情況作出分類: 違規 情況 範例 沒有遵從消防安全規定的情況 違規類別 1 i. 自動花灑系統不在有效操作狀態(主要消防安全規 定);以及 ii. 沒有按規定裝設排煙系統(主要消防安全規定) 嚴重違反消防 安全規定 2 i. 使用未經指定或許可的燃料(主要消防安全規 定);以及 ii. 預設可開啟/打碎的窗戶被裝飾物阻塞或被封閉 的面積超過總面積的百分之五十,或有關窗戶上 半部分被裝飾物阻塞或被封閉的面積超過百分之 二十五(主要消防安全規定) 嚴重違反消防 安全規定 3 i. 沒有按規定提供滅火筒(非主要消防安全規定) 輕微違反消防 安全規定 4 ii. 使用未經指定或許可的燃料(主要消防安全規 定);以及 iii. 沒有按規定提供滅火筒(非主要消防安全規定) 輕微違反消防 安全規定 5 i. 消防栓/喉轆系統不在有效操作狀態(主要消防安 全規定);以及 ii. 沒有按規定提供滅火筒(非主要消防安全規定);以 及 iii. 用於可燃間隔的防火漆不符合相關規定(非主要消 防安全規定) 輕微違反消防 安全規定
- 1 -
附件II 就食物業處所遵行消防安全規定建議的措施 而進行的營商環境影響評估(營商環評)
研究結果及建議撮要
背景
政府當局建議實施以下三項新措施,以推行申訴專員/ 效率促進組向消防處和食物環境衞生署(食環署)提出的建議, 監察食物業處所遵行消防安全規定的情況︰
(a) 向普通食肆牌照、小食食肆牌照和工廠食堂牌照施加以 下持牌條件:“持牌人須時刻遵行消防處處長發出的消 防安全規定。”,以及訂立新的警告信制度,以監察未 有遵行規定的情況;
(b) 向普通食肆牌照、小食食肆牌照和工廠食堂牌照施加以 下持牌條件:“有關的食物業處所如在下一個牌照有效 期開始當日並無領有有效的《消防裝置及設備證書》(FS 251 證書)及《通風系統年檢證書》(年檢證書),且未能 在牌照期滿日期前14 天或之前向消防處提交有效的文 件以供審核,食環署可拒絕其牌照續期申請。”;以及
(c) 修訂現有的《符合規定證明書C (消防規定)》(表格C), 以方便申請人申報有關處所有否使用聚氨酯泡沫塑料 墊褥和襯墊家具,如有的話,則提交相關的發票和測試 證明書。表格C 是食物業牌照申請人必須向食環署提交 的文件之一,以獲發暫准牌照。
由於建議措施可能對業界造成影響,食環署和消防處在 經濟分析及方便營商處協助下,委託了外間顧問進行營商環境 影響評估(營商環評)研究。該研究於二零一二年八月十三日展 開,而營商環評報告則正在定稿。
- 2 -
營商環評研究的主要研究結果和建議
根據顧問研究所得,業界相關人士1普遍歡迎政府提出 措施,以提高食物業處所對消防安全問題的認識。 建議措施(a)
根據顧問研究所得,如建議措施(a)對業界相關人士的業 務運作不會造成直接和重大的影響,他們不會提出反對。此外, 顧問研究顯示,建議措施(a)提述的新監察機制讓業界相關人士 有合理時間及時糾正所發現的欠妥之處。因此,顧問建議政府 當局實施建議措施(a),以便更有效地維持持牌食物業處所的消 防安全標準。然而,由於業界相關人士(尤其是中小企)表示難 以理解在監察機制下什麼情況會構成嚴重/輕微違反消防安全 規定,因此,建議措施(a)所提述的非有關消防裝置及設備的消 防安全規定說明須予重新編訂,以便更易於理解。消防安全規 定的說明經重新編訂後,持牌人應更容易理解有關規定,從而 能夠時刻遵行這些規定。此外,顧問建議,為進一步加強業界 相關人士對消防安全規定的認識,政府當局應考慮印製說明小 冊子,使持牌人更加明白自己有責任持續遵行消防安全規定, 以及讓他們更清楚知道政府已設立溝通途徑,以處理與食物業 處所的消防安全規定相關的事宜。 建議措施(b)
根據顧問研究所得,如建議措施(b)對業界相關人士的 業務運作不會造成直接和重大的影響,他們不會提出反對。由 於建議措施(b)並無要求業界相關人士執行額外工作(除就提交 大廈的各項FS 251 證書提出的關注事項外),顧問建議政府當 局落實建議措施(b),並施加有關的牌照續期規定,以改善行政 程序,使食物業的營運能同時符合遵行消防安全規定的要求。 鑑於持牌人在取得大廈的各項FS 251 證書方面可能會有困 難,顧問進一步建議政府當局不應規定持牌人須在牌照續期期 間提交大廈的各項FS 251 證書。消防處應考慮訂定工作程序, 利用其新的電腦系統查核大廈的各項FS 251 證書的提交情況。 1 此項研究訪問的業界相關人士包括食肆代表,以及代表食肆、酒店、戲院、夜總會及酒吧等的業 界團體。為進行研究,共有超過50 名業界相關人士受訪。
- 3 -
建議措施(c)
根據顧問研究所得,建議措施(c)與業界的現行做法並不 完全相符,原因是中小企或未能在申請暫准牌照時及時取得發 票和測試證明書。顧問建議政府當局採取務實而又不致對業界 造成太大負擔的替代方法,就是考慮落實建議,修訂申請暫准 牌照所需提交的表格C,即進一步修訂該表格內的相關條款和 條件,以便更能配合業界做法而又不會影響消防安全,以及給 予六星期的寬限期讓暫准牌照申請人向消防處提交發票和測試 證明書,但前提是他們須在消防處的視察人員於暫准牌照發出 後展開遵行規定巡查時,出示詳載有關聚氨酯泡沫塑料墊褥和 襯墊家具資料的送貨單。有關寬限期的長短是參考業界相關人 士所述的業界做法而釐定的,而相關的專業服務機構也進一步 確認寬限時間足以取得所需文件。 遵循規定(遵規)成本分析
遵規成本分析的結果顯示,實施原本的建議措施(a)和(b) 所衍生的遵規成本,是業界相關人士可負擔的,因為有關成本 微不足道,而涉及的人手需求也可透過調配現有人手予以應 付。大部分受訪的業界相關人士也認同,這兩項措施對其業務 運作不會造成太大負擔。
至於建議措施(c),顧問認為由於申請人未必可以及時取 得發票和測試證明書,因此不能排除有關做法或會招致延遲開 業的情況,因延遲開業而在租金及勞工成本方面招致的損失, 可能會對業界相關人士造成重大影響。然而,採取顧問建議的 緩解措施後(即給予六星期的寬限期讓暫准牌照申請人向消防 處提交發票和測試證明書,但前提是他們須在消防處視察處所 時,出示聚氨酯泡沫塑料墊褥和襯墊家具的送貨單),遵規成本 會減至微不足道的水平。
FD06142 | 2008_港澳台_香港_立法会_嘉禾大厦火灾后食物业消防安全规管_资料摘要.pdf
分类:06_境外及港澳台调查报告 | 年份:2008 | 地域:香港 | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
立法會 Legislative Council
立法會CB(2)1511/12-13(05)號文件
檔 號:CB2/PL/FE
食物安全及環境衞生事務委員會
立法會秘書處為2013年7月9日會議 擬備的資料摘要
食物業處所的消防安全規定
2008 年8 月在嘉禾大廈導致4 死( 包括兩名消防員) 及55 人 受傷的火警,令公眾廣泛關注到持牌處所的消防安全問題,尤其 是有大量市民光顧的處所。申訴專員其後就消防處及食物環境衞 生署(下稱"食環署")對食肆執行的消防安全規管措施展開主動 調查。
申訴專員於2010年5月發表調查報告。該報告揭示,消防處 雖然設有法定核證制度,規定處所擁有人必須安排註冊承辦商 每年檢查消防裝置或設備一次,但卻監管不嚴且成效不彰。消防 處進行巡查的次數不但低於目標,並僅對未有遵從消防安全規定 及逃生途徑被阻塞或鎖上等少數個案提出檢控。調查又揭示, 食環署在沒有查核處所是否符合消防安全規定的情況下,為處所 續發食物業牌照,令市民誤以為有關處所安全穩妥。申訴專員提 出了11項改善建議,當中包括 (a) 消防處應加快設立電腦系統及修訂法例,以便及早識 別未有遵從法定要求的處所擁有人及註冊承辦商;
(b) 消防處在考慮立法強制規定處所展示消防裝置及設 備證書(下稱"FS251證書")的同時,應鼓勵處所把證書 展示在顯眼位置;
(c) 消防處應就所有須即時處理的個案進行巡查,並抽查 可稍後處理的個案;
(d) 消防處應規定註冊承辦商在向消防處呈交FS251證書 前,先修妥不合規格的消防裝置或設備;
2 (e) 消防處應加強對未有檢查消防裝置或設備的處所 擁有人、沒有呈交FS251證書的註冊承辦商,以及導 致逃生途徑阻塞或將其鎖上的處所擁有人/使用者 提出檢控;
(f) 消防處應與屋宇署擬訂程序,以便該署在收到有關逃 生途徑嚴重阻塞的轉介個案並採取行動後,通知消防 處,而消防處亦應在有需要時跟進此類個案及採取執 法行動;
(g) 食環署應在食物業牌照上訂明處所必須遵從消防 安全規定;
(h) 食環署應與消防處訂立機制,確保食肆必須符合消防 安全規定,方可獲批續牌申請;及
(i) 消防處應全面檢討消防處突擊巡查的次數,以及所需 的人手。
此外,效率促進組於2011年6月完成一項有關消防安全監管 及相關管理事宜的管理研究,其中建議消防處和有關部門應考慮 檢討申請暫准牌照須提交的證明文件,以證明已符合消防安全 規定。
為了落實申訴專員及效率促進組的建議,消防處及食環署在 食物業牌照上施加兩項附加條件,以確保持牌的普通食肆、小食 食肆和工廠食堂持續遵從消防安全規定。當局亦提出一個警告信 制度,以確保消防處及食環署有系統地跟進違反消防安全規定的 情況。當局亦建議修訂《符合規定證明書C(消防規定)》(表格C), 表格C是食物業牌照申請人必須向食環署提交的其中一份文件,以 便獲發暫准食物業牌照。有關修訂旨在方便申請人申報有關處所 是否使用聚氨酯乳膠墊褥和襯墊家具,以及若有,提交發票和測 試證明書,證明申請牌照的處所內所有聚氨酯乳膠墊褥和襯墊家 具均符合特定標準。
政府當局表示,建議的規管措施不會增加業界的工作或成 本。當局亦在2012年9月至11月期間,就持牌食物業處所遵從消防 安全規定所建議的新措施進行營商環境影響評估。
立法會秘書處 議會事務部2 2013年7月3日
FD06143 | 2010_港澳台_香港_福州市马尾高福纺织火灾_火灾_调查报告.md
分类:06_境外及港澳台调查报告 | 年份:2010 | 地域:福州 | 严重程度: | 场所: | 起火原因:电气;吸烟;焊接/动火;危化/自燃;纵火 | 来源格式:md
一、起火单位基本情况
福州马尾高福纺织有限公司位于马尾经济技术开发区,系福州经济技术开发区经济发展总公司与香港效昌实业有限公司的合资企业,股份分别为4%和96%,注册资本312.5万美元,主要生产100%腈纶纱、混纺纱、人造棉和混纺涤纶纱等产品,年产值455万美元。该公司总经理麦子文(台湾新竹市人)为法人代表,公司员工376人。原设计,该大楼为四层框架结构,高23.95米,占地面积3979.5平方米,建筑面积15918平方米,工程总造价1200万元人民币。一层为生产车间,两堵防火墙分隔出一部分仓库和部分厂部、职工食堂;二层、三层、四层中间为生产车间,东西两侧用防火墙分隔出一部份,二、三层为办公室。四层为活动室和员工临时倒班宿舍;东西两侧各有一部楼梯,每层车间东西两侧大门均设防火门。但该公司严重违反消防安全管理规定,擅自改变原设计功能和市消防部门的建筑防火审核意见,将四楼的生产车间改为仓库使用,库内存放晴纶毛纱33万磅、手钩纱1.6万磅、晴纶回花92250公斤、晴纶毛条89000公斤。在库内紧靠东侧防火墙,用木龙骨和纤维板违章搭盖了8间面积为300平方米的女工倒班宿舍,为了东侧员工临时宿舍的通风采光,在防火墙上打了7个1.2×1M的孔洞,破坏了防火墙功能,留下严重隐患。
二、起火经过和扑救情况
1993年12月13日凌晨4时36分6秒,主管区马尾公安消防五中队接到报警后,快速出动一部消防水罐车,19名官兵,于4点38分到达火场,消防车停在火场西侧大门内,此时火势猛烈,浓烟翻滚,中队长师红斌简单了解情况,侦察火情后,一面下达战斗命令,在东西两面墙外垂直铺设水带,出二支水枪掩护救人和灭火,东面由中队长师红斌带领9名战士,在一支水枪的掩护下,强行进入四楼女工宿舍区救出被困女工4名,营救11名女工逃生,西面由副指导员吴文春带领8名战士强攻四楼,出一支水枪,掩护和营救25名男工逃生。一面用电台呼叫中队基地电台向支队报告火场情况,请求增援。支队指挥中心4时41分接到五中队报警后,张光荣支队长立即调遣马尾区的马尾造船厂、省海洋渔业公司、红山油管站3个专职消防队3部战斗车和福州市区二中、三中、四中、七中4个中队12部战斗车,2部消防登高车,火速奔赴火场。5时零8分,支队指挥车,专职队3部战斗车,公安消防队12部战斗车,2部消防登高车,210名指战员和专职队员先后赶到火场(福州市区距马尾20多公里)。这时,火势凶猛,烟雾弥漫,战斗行动非常困难,形势非常严峻。支队长张光荣、政委赵锦云等四位支队领导沉着冷静,立即成立火场总指挥部,统一协调指挥抢救人员和火场战斗。火场总指挥部根据五中队的报告和火情侦察,获悉有近百名女员工被大火围困在四楼东侧宿舍,情况万分危急。张光荣支队长当机立断,下达战斗命令,部署战斗行动。1、组织突击队,排除万难,抢救人命。从二中、三中、四中、五中、七中5个中队挑选素质精良的干部战士共40名,组成4个抢险救人突击队,舍身忘死,英勇救人。第一、二队在赵锦云政委、高建民副支队长的带领下,四中队中队长郭可源、七中队副中队长黄兴发等20名突击队员,置个人生死于度外,顶着强烈幅射热,从东侧楼梯进行冲击,勇敢地突破有毒烟雾区,冲入围困区,救出5名被困女工和数十名遇难女工;第三队由王平石副支队长指挥二中队代理副中长张枫成等10名突击队员,利用东南面窗户,在无任何安全保险的情况下,冒着生命危险,带上安全绳,徒手攀登进入宿舍区,救出4名被困女工;第四队在执勤组长吴庆培的组织指挥下,10名突击队员,从东面用挂钩梯联用,带上安全绳,从窗户强行登上四楼,深入宿舍区,救出2名女工。2、快速展开战斗,全力掩护救人,重点扼制火势,迅速扑灭火灾。在下达救人命令的同时,张光荣支队长向各中队下达了战斗主攻任务和主攻方向。命令:401东风水罐车停在火场北面靠东,水带干线穿过围墙,沿大楼东面墙外垂直铺设水带干线至四楼,利用分水器出三支水枪掩护救人,并向火场进攻,403消防车用车泵从青洲河吸水,向401供水。203东风水罐车,停在大楼北面靠东,穿过围墙沿东面墙外铺设两条干线,利用分水器出四支水枪,掩护救人和进攻火场,701消防车利用车历史意义从青洲河吸水,还有一台泵浦也从青洲河吸水,同时向203供水。二中队201东风水罐车停在大楼西南角,沿大楼墙外铺设两条干线至西侧四楼,利用分水器出三支水枪,进攻西面火场,202消防车用车泵从青洲河吸水,向201供水。301消防车停在大楼西侧,利用青洲河开展4号操,沿西面墙外垂直铺设水带到四楼,出两支水枪进攻。四中队404黄河车停在火场北面靠东,利用一台泵浦从青洲河吸水和公司隔壁一粒消火栓,同时向404供水,用水炮轰击东北面火场,扼制火势,冲散烟雾,为救护人员创造条件。304黄河水罐车停在大楼北面围墙外用水泡进攻北面火势,302东风水罐车利用车泵和一台泵浦从青洲河吸水,同时向304供水。红山油管站消防车,停在大楼北面围墙外,利用青洲河开展四号操,用水泡进攻,控制西北面火势。402东风水罐车停在大楼北面靠东,铺设一条干线至大楼东南角,利用分水器出二支水枪,分别布置在大楼东面和南面靠东掩护救人和控制火势,马尾造船厂东风水罐车用车泵从青洲河吸水,向402供水。204黄河水罐车停在大楼西南角,用水泡控制火场南面火势,省海洋渔业公司消防车用车泵从青洲河吸水,向204供水。6时30分控制了火势。随后,根据火场情况,适时调整部署力量,从东西两面夹击,发起最后进攻,7时左右大火基本扑灭。
这起火灾的扑救,支队共调动5个公安消防中队,3个专职消防队,16部战斗车,2部消防登高车,170名指战员和40名专职队员参加灭火和救人战斗,同时调集了驻地解放军、边防指战员、公安干警、省、市医疗人员和机关干部600多名参加救援,经过2个半小时的英勇战斗,救出受困员工81名(其中抢救无效死亡23名),成功地扑救这场特大恶性火灾,保住了价值600多万美元的厂房、设备和物资。
三、火灾损失
火灾造成61人死亡,7人受伤,基本是四川、长乐、连江、霞浦等地民工,烧毁建筑面积3979M2,烧毁化学合成纶纱、纶回花、纶毛条等35多万磅,直接经济损失达603.6万元人民币(303.6万元人民币、50万美元)。
四、火灾原因
火灾发生后,市公安局迅速组织福州市消防支队、马尾区公安分局组成火灾原因调查组,在省消防总队的指导下,对火灾现场进行了认真细致的勘查、论证,并对火灾现场目击者进行多次调查访问,查明起火部位在四层仓库南墙西侧,起火点在西南化纤原MN120(俗称毛球)堆垛处。经过两个昼夜的奋战,于12月15日下午,排除了电气起火、毛球自燃、烟头阴燃等可能性,同时根据起火点可燃物判断火是从外向内燃烧,而且引燃时间短,燃烧蔓延迅速的特点,确认了火灾是人为引起的,有重大纵火嫌疑。
福州市公安局迅速成立了“12·13”特大纵火案件专案组,深入现场勘查,多方访问公司员工,寻找罪犯留下的蛛丝马迹,最后所有疑点集中在因偷窃而被公司开除的女工董扬玲身上。12月15日晚,依法传唤了董扬玲。也许是难以承受良心的遣责,也许是无法面对哭泣的冤魂,董扬玲没有做丝毫的抵赖,如实招供了所犯的罪行。
12月12日晚,董扬玲混入公司宿舍,13日凌晨3时50分左右,她手拿一盒火柴经四楼仓库下楼,报复性地点燃了西侧电梯附近的一堆毛球,看到毛球冒烟后,她离开公司回到长乐家中。
五、消防监督管理情况
1990年10月6日,高福纺织有限公司工程开工之后,福州经济技术开发区建设总公司才将施工图纸送达福州消防支队审核。一期工程只先建一幢厂房,要求将仓库、餐厅、厂部办公及职工临时宿舍设于厂房内,二期工程完成后搬出。市消防支队提出了生产车间、仓库、生活设施应采用实体墙进行分隔,设置封闭楼梯间,待二期工程竣工后,以上设施应迁出等具体要求。1991年2月工程竣工,同年6月,未经消防验收便投产使用。1993年1月8日,马尾消防科也曾向该公司发出书面整改通知书,提出了五条整改意见,其中提出生产与生活区要分开,车间和仓库不得进行分隔作为职工宿舍,四楼违章搭盖的职工宿舍要自行拆除,但该公司置若罔闻,致使酿成火灾。
六、经验教训
——改变建筑使用功能。按原一期工程的设计和设计审批,第四层为生产车间,但工程竣工后,该公司擅自将生产车间改为仓库使用并存放35万磅腈纶纱,火灾时全部被烧毁,直接经济损失23.6万元人民币和50万美元。
——违章在仓库内搭盖职工宿舍。该公司将车间改为仓库后,又违章在库内用木料搭盖8间面积230平方米的简易职工宿舍,致使起火当晚住在该宿舍的40名职工,除3人侥幸逃出,其余37名全部被烧死。
FD06144 | 2011_台湾_台中阿拉夜店火灾_监察院弹劾案文.pdf
分类:06_境外及港澳台调查报告 | 年份:2011 | 地域:台湾 | 严重程度: | 场所: | 起火原因:焊接/动火 | 来源格式:pdf
1
彈 劾 案 文
壹、被彈劾人姓名、服務機關及職級: 黃崇典 台中市政府都市發展局 局長 (比照簡任第13 職等政務官任用;任職期間:93 年4 月26 日 至100 年3 月15 日,現任職台中市政府顧問)。 朱蕙蘭 台中市政府經濟發展局 局長 (比照簡任第13 職等政務官任用;任職期間:97 年7 月1 日至 100 年3 月15 日,現已離職)。 吳青芳 台中市政府消防局 副局長 (警監3 階;相當 簡任第11 職等;任職期間:99 年12 月25 日 迄今;88 年1 月17 日至99 年12 月24 日間任 台中市政府消防局局長)。 貳、案由:台中市政府都市發展局局長黃崇典、經濟發展局 局長朱蕙蘭、消防局副局長吳青芳,均明知轄 內哈克飲料店(招牌ALA PUB)長期違規營業, 竟未積極督促並妥善處理,肇致於100 年3 月6 日凌晨發生火災,釀成9 死12 傷之重大傷亡慘 劇,經核均有重大違失,爰依法提案彈劾。 參、違法失職之事實與證據: 本件ALA PUB 夜店火災案係於民國(下同)100 年3 月6 日凌晨1 時24 分發生在台中市西區中興里中興街4 巷1 號哈克飲料店(招牌名稱:ALA PUB,傑克丹尼PUB 店)。本案建築物登記面積僅51.73M 2,內部空間狹小 擁擠,案發當時店內人數眾多,表演者於夾層鋼管舞台 使用自製LED 壓克力棒前端加上筒狀火花點燃後,手持 LED 壓克力棒後端金屬鍊子快速旋轉以製造特效,甩出 之火花不慎引燃夾層鋼管表演台正上方附近隔音泡 棉,因隔音泡棉為易燃物質火勢迅速延燒,及因逃生 門緊閉,在場觀眾逃生不及,因而造成9 人死亡、12 人
2
輕重傷之傷亡慘劇。茲就各違法失職之事實與證據分 述如下: 一、台中市政府都市發展局局長黃崇典違失部分: 被彈劾人黃崇典自93 年4 月26 日起至100 年3 月15 日擔任台中市政府都市發展局局長職務,負有 綜理該市住宅管理、都市規劃、都市設計、都市開 發、建造管理、使用管理、營造施工、廣告物管理 及違章拆除等事項之責。於任職期間內竟未能督促 所屬依法辦理都市規劃及建築管理業務,致釀成9 死 12 傷之公安事故,其違失之事實與證據如下: (一)被彈劾人黃崇典明知轄內ALA PUB夜店之業者長期 違反都市計畫法,於住宅區內經營PUB酒吧,竟未積 極依法取締拆除: 1、按都市計畫法第79條第1項規定:「都市計畫範圍 內土地或建築物之使用……,違反本法或內政 部、直轄市、縣(市)(局)政府依本法所發布之命 令者,當地地方政府或鄉、鎮、縣轄市公所得處 其土地或建築物所有權人、使用人或管理人新臺 幣六萬元以上三十萬元以下罰鍰,並勒令拆除、 改建、停止使用或恢復原狀。……」、同法第80 條規定:「不遵前條規定拆除、改建、停止使用 或恢復原狀者,除應依法予以行政強制執行外, 並得處六個月以下有期徒刑或拘役。」又都市計 畫法臺灣省施行細則第15條規定:「住宅區為保 護居住環境而劃定,不得為下列建築物及土地之 使用:……十一、舞廳(場)、酒家、酒吧(廊)、 特種咖啡茶室、浴室、妓女戶或其他類似之營業 場所……十五、其他經縣市政府認為足以發生噪 音、振動、特殊氣味、污染或有礙居住安寧、公 共安全或衛生並公告限制之建築物或土地之使
3
用」。準此,住宅區不得為酒吧(廊)等類似營 業場所之使用,違反規定者得依上開都市計畫法 第79、80條規定處分,合先敘明。 2、次按加強建築物公共安全檢查及取締執行要點 (內政部87年11月9日訂定、91年6月14日修正) 第2點規定:「直轄市、縣 (市) 主管建築機關應 集中人力,優先執行建築物公共安全檢查簽證及 申報業務……」、第4點規定: 「……各級目的事 業主管機關並應就負責稽查取締項目,確實依照 各該主管法規處理」。另依同要點附表二明文規 範:所謂B-1類之建築物係指「供娛樂消費,處封 閉或半封閉場所」。(應清查業別:PUB。)並列 為第一順序。至於B-3類則係指「供不特定人士餐 飲,且直接使用燃具之場所。但餐飲場所營業時 間超過正常用餐時間,且設舞台或舞池或類似空 間,提供表演節目或歌唱者,歸屬B-1類組」。 (應清查類別:酒吧。備註:酒吧原列第一順 序。)。據此,依上開規定無論「PUB」或「酒吧」 均屬B1類組,並屬第一順序加強檢查之營業場 所,各縣市政府應依法執行檢查及取締不法。 3、本案ALA PUB夜店經查係於住宅區開設商業類之P UB(酒吧)無疑,有違上開都市計畫法臺灣省施 行細則第15條規定住宅區係「保護居住環境」而 劃定,不得為酒吧(廊)等「類似營業場所」之 使用,法條意旨甚明,理應依上開都市計畫法第7 9條規定處新臺幣6萬元以上30萬元以下,並勒令 拆除、改建、停止使用或恢復原狀以及同法第80 條規定不遵前條規定拆除、改建、停止使用或恢 復原狀者,除應依法予以行政強制執行外,並得 處六個月以下有期徒刑或拘役。詎被彈劾人黃崇
4
典竟放任業者長期違規營業,未能督促所屬依法 處置,致釀災害慘劇。 (二) 被彈劾人黃崇典明知本案業者於斷水斷電期間仍 有違規營業情事,竟未本於權責依建築法第94 條 之1 規定以及加強建築物公共安全檢查及取締執行 要點處置: 1、查本案ALA PUB於97年3月6日聯合稽查時,經台 中市政府都市發展局認定涉有「避難層出入口寬 度不符」等缺失,該局遂於97年3月17日科予罰緩 並命令停止使用,惟該業者自始未依限改善,復 經該府於97年4月16日再次聯合稽查時,發現該 業者仍有違規營業使用之情形,該局遂於同年5 月8日簽准執行斷水斷電,並函請各有關機關追 蹤列管。嗣經台中市警察局第一分局於97年11月 5日22時25分執行臨檢勤務時發現,該業者經執 行斷水斷電後仍持續營業,旋於97年11月7日以 中分一行字第0970035342號函移請該府都市發展 局依權責處理,並檢送臨檢紀錄表影本(經店家 在場負責人簽名確認無訛),此有台中市警察局 第一分局函在卷可稽(附件1,第1~4頁)。 2、詎該府都市發展局於同年11月10日接獲警察單位 通報業者擅自接水接電之紀錄後,竟僅於同年11 月17日之來函簽擬「一、本案已申請辦理建物恢 復使用手續,使管組轄區並於97年11月13日辦理 現勘(目前停業中)如后附件。二、呈閱後文 存」,而未依建築法第94條之1:「依本法規定停 止供水或供電之建築物,非經直轄市、縣(市)(局) 主管建築機關審查許可,不得擅自接水、接電或 使用;未經許可擅自接水、接電或使用者,處一 年以下有期徒刑、拘役或科或併科新臺幣三十萬
5
依『台中市政府針對經斷水斷電仍私自恢 復營業之商家執行作業流程』對該址實施複查,
6
已有先行營業情形,並於97年11月6日(按:經查 原文誤植,實際日期應為97年11月7日)以中分一 行字第0970035342號函報市府相關單位查處在 案」。詎料,都市發展局竟未詳實引述警察局之 會簽意見,刻意遺漏該業者早有多次違規先行營 業遭查獲之事實。嗣於同年11月20日綜簽該府一 層略以:「……二、本案經會簽本市消防局、本 市警察局、本府經濟發展處該場所歷年來紀錄及 處理情形相關資料如后……經本府97年11月13日 辦理現場聯合會勘後,尚符規定……五、有關本 案申請恢復使用及供水供電是否會再違規乙節, 已由申請人王智慧君切結『除依核准建築物使用 執照所載用途使用外,絕不自行或租賃他人為違 反原核准用途之營業場所或使用,倘若違背願受 最嚴厲之處分,願負一切法律責任,並放棄先訴 抗辯權』,另經申請人出具說明未來供『住家』 使用」(附件3,第8~9頁),案經副市長蕭家淇簽 註:「申請依原核准用途使用,同意所請,唯繼 續追蹤其使用。」以市長胡志強(甲)章核定後, 於97年12月5日以府都管字第0970282239號函同 意業者在該址建築物恢復使用及供水供電。都市 發展局既明知本案業者遭斷水斷電期間已有先行 違規營業之情事,非但未予移送法辦,反而草率 簽請同意業者復水復電,違失情節彰彰明甚。 3、再查本案業者於97年11月10日申請恢復使用及供 水供電時曾出具「本屋坐落台中市西區中興4巷1 號1樓,日後恢復住家用途」之切結聲明,惟稽查 人員於98年1月16日赴該址進行聯合稽查時,再 度發現業者違規使用建築物且現場備有樂隊演唱 台。另於99年8月19日都市發展局再次前往聯合稽
7
查時,該業者除「違規使用建築物」外,亦涉有 「未維護建築物構造及設備安全」等違規情事。 上開相關稽查紀錄分別於98年1月19日以府經商 字第0980016337號函,及99年8月23日府經商字第 0990241403號函移請各權責單位進行處理在案, 此有上開兩函在卷可考(附件4,第10~16頁),足 證業者自97年12月5日獲准復水復電後,迄100年 3月6日發生火災達2年4個月期間,依然重操舊 業,違法於住宅區經營PUB夜店,台中市政府都 市發展局亦明知此情,竟均視若無睹,未按「台 中市特定目的事業停止供水供電及強制拆除作業 要點」第8點規定,依法處理。 4、末按本案之ALA PUB夜店係屬「供娛樂消費,處封 閉或半封閉場所」,應適用B-1類組之安全檢查標 準無疑;台中市政府都市發展局於97年5月8日對 該業者執行斷水斷電前之聯合稽查紀錄(97年3 月6日)亦係作此認定,並據以執行斷水斷電,惟 97年12月5日業者復水復電後,該局於執行聯合 稽查時,竟多次將該建物逕更改為B-3類或未予分 類(附件5,第17~25頁),恣意降低其公安檢查 之標準,違反「加強建築物公共安全檢查及取締 執行要點」第5點及其附表二之規定。 二、台中市政府經濟發展局局長朱蕙蘭違失部分: 被彈劾人朱蕙蘭自97 年7 月1 日起至100 年3 月15 日止擔任台中市政府經濟發展局局長職務,負 有綜理台中市產業發展、工業、商業、礦業、公帄 交易、市場管理及公用事業等事項之責。於任職期 間內對於該局主辦之聯合稽查等商業管理業務,竟未 能督促所屬依法辦理,致釀成9 死12 傷之公安事故, 其違失之事實與證據如下:
8
(一)被彈劾人朱蕙蘭明知台中市政府於97 年5 月8 日 對本案業者執行斷水斷電後,竟未督導所屬依商業 登記法第7 條規定,辦理廢止商業登記: 查台中市政府於97 年5 月5 日以府都管字第 0970105024 號函請各相關機關派員於同年月8 日對 本案業者採取強制斷水斷電措施,該函之副本亦 送達經濟發展局(附件6,第26~27 頁),該局明知 業者於斷水斷電後已不得再從事相同之營業行 為,理應督促所屬依商業登記法第7 條規定廢止業 者之商業登記,惟被彈劾人朱蕙蘭仍未依法處置, 放任業者繼續違規營業至為灼然。 (二)被彈劾人朱蕙蘭於擔任台中市政府經濟發展局局長 期間內,對於該局為主導之「台中市政府違規視聽 歌唱等七種行業聯合稽查」業務,未能督導所屬確 實辦理: 按「台中市政府違規視聽歌唱等七種行業聯合 稽查作業守則」(97 年5 月23 日簽奉市長核定,97 年6 月27 日起實施)規定:「……貳、目標:執行 取締違規視聽歌唱、理髮、三溫暖、舞廳(場)、酒 家、酒吧、特種咖啡茶室等違法業者,以確保公共 安全,提高生活品質,保障民眾之福祉」。被彈劾 人朱蕙蘭身為聯合稽查小組主辦機關 合稽查小組主辦機關之首長,職司 商業登記及商業管理事宜,竟長期放縱業者違規營 業於先,此有該府對視聽歌唱等八種行業、電子遊 戲場及資訊休閒業管理管制卡違規紀錄足按(附件 7,第28~30 頁),推卸責任陳稱該業者非商業登 記法所不准於後,此觀97 年1 月16 日經濟部修改 商業登記法後,均無裁罰紀錄,或註記「未違反商 業登記」即明。顯然自棄商業管理責任。復於97 年5 月8 日後業者遭斷水斷電期間,理應依商業登
9
記法第7 條規定據以廢止商業登記,或督促其辦理 變更登記,對於一層決行之復水復電會勘作業,仍 始終未表示意見。又依該府聯合稽查作業守則中規 定:「由商業單位負責主導,得會同都市計畫、建 築管理、消防、環境保護、衛生等相關機關各依權 責及主管法令配合檢查,並得視需要請警察機關協 助」。該局於聯合稽查小組中居主導地位,被彈劾 人朱蕙蘭非但未能善盡主導之責,發揮聯合稽查小 組應有之功能,且敷衍卸責,致釀災害。 三、台中市消防局副局長吳青芳違失部分: 被彈劾人吳青芳自88 年1 月17 日起至99 年12 月24 日擔任合併前台中市消防局長(自99 年12 月25 日台中縣市合併升格為直轄市後,改任台中市消防局 副局長),負有綜理該市火災預防、危險物品管理、 災害搶救、災害管理、緊急救護、教育訓練、火災 調查、救災救護指揮等事項之責。於長達十餘年之 任職期間內,對於主管之消防安全檢查,竟未能督促 所屬依法辦理,致釀成9 死12 傷之公安事故,其違 失之事實與證據如下: (一)被彈劾人吳青芳明知本案業者於遭斷水斷電期 間,仍私接水電非法營業,竟未通報權責機關處理: 查本案業者於97 年5 月8 日至97 年12 月5 日台 中市政府執行斷水斷電期間仍違法營業,消防局 於97 年6 月8 日、7 月25 日執行2 次例行性消防 安全檢查時早已發現此情,理應依「台中市特定目 的事業停止供水供電及強制拆除作業要點」之相關 規定通報查處,詎未予通報,詢據被彈劾人吳青芳 (時任台中市消防局長)稱:「消防局不知道斷水 斷電這件事。也無通知我們。我相信同仁不清楚 的。這是我們台中市斷水斷電,回報有無營業是
10
警察局查報的,我們這裡不知道的」云云。惟查, 台中市政府97 年5 月5 日通知各單位於同年5 月8 日配合執行斷水斷電之公文正本載明台中市消防 局,此有該府都管字第0970105024 號公文在卷可 稽(同附件6,第26~27 頁)。再查,97 年5 月8 日當日執行評定違規商號建築物停止供水供電強 制拆除工作簽到表,台中市消防局災害搶救課計 有蕭智聰、曾誌誼、廖石佳、許拓昇等4 人簽名配 合執行,有該簽到表在卷足證(附件8,第31~33 頁),被彈劾人吳青芳聲稱不知情,顯係卸責之詞。 又徵諸被彈劾人吳青芳於84 年2 月15 日衛爾康火 災事件擔任該市警察局消防警察隊隊長,長年於消 防單位服務,對於安檢通報業務理應熟稔,難謂不 知,渠所辯委無可採。 (二)被彈劾人吳青芳於台中市消防局長任內,未能責成 所屬落實消防安檢,致釀成本案9 死12 傷之重大 公安事故: 查台中市政府消防局於本案發生前5 年內(95 年1 月8 日至100 年2 月17 日),對本案營業場所之 消防安全設備、檢修申報、防火管理、防焰規制 等,自行檢查共計21 次;除99 年7 月1 日檢查發 現該年度未依規定辦理檢修申報外,其餘均合格 (附件9,第34 頁)。本案業者於斷水斷電期間違法 營業時,該局2 次辦理例行性消防安檢(97 年6 月 8 日、97 年7 月25 日),檢查結果亦為合格(附件 10,第35~36 頁)。又該局近3 年與市府其他單位 聯合進行消防安全檢、複查共計9 次,近5 年消防 安全設備檢修申報共計10 次,現場檢查結果均為 合格(附件11,第37~38 頁)。另據本院現場履勘 及本案火災原因調查鑑定書認定:火災發生後之逃
11
生門情形,該建築物1 樓東南側逃生出入口之鐵質 安全門門栓有向內彎曲現象,顯示係搶救人員由 外而內破壞進入,安全門內層鋪設保麗龍、保麗 龍表面黏貼吸音泡棉;安全門進入PUB 內部有一木 質裝潢隔間,亦於搶救人員進入時破壞。另夾層 東南側逃生出入口之鐵質安全門由搶救人員破壞 進入,並由外而內依序破壞鐵門、木質隔間門、 喇叭鎖木門搶救。顯見當時逃生門堵塞,無法發 揮應有之功能。然該局歷經多次安檢均屬合格,尤 以該場所甫於100 年2 月17 日安檢合格,未滿1 個月即發生重大公安事故,被彈劾人吳青芳未覈實 督導所屬辦理公安檢查至為明顯。 肆、彈劾理由及適用之法律條文: 一、黃崇典部分: (一)被彈劾人黃崇典對於上開違失事實不予否認,惟辯 稱:「依都市計畫法臺灣省施行細則第15 條規定, 對於分區使用限制採負面列舉,為行業管理之目 的,該條文係所列之酒吧,指有陪侍之色情行業不 得於住宅區設置,其與有無表演節目無涉。而針對 酒吧之定義,內政部營建署所頒布之『建築物使用 類組及變更使用辦法』中之定義,分與都市計畫法 臺灣省施行細則之定義及經濟部所訂之『公司行號 營業項目代碼』之定義不同,臺中市政府於94 年7 月1 日請示內政部及經濟部,該署於94 年7 月27 日回覆已納入修法之參考,惟迄尚未檢討修正,另 臺中市政府復於98 年4 月21 日再請示,於98 年5 月8 日經函釋在案,相當明確,內政部第一時間的 說明,顯仍未釐清營建署都市計畫管理與建築管理 之定義自相矛盾之地方,致誤導部長做錯誤說明」 等語(附件12,第39~48 頁)。惟查,內政部營
12
建署97 年7 月7 日營署建管字第0970037713 號函 謂:「……行政院主計處訂頒之『中華民國行業標 準分類』,主要係提供作為統計資料分類之使用, 並以各該場所單位之主要經濟活動作為分類基 礎,與都市計畫土地使用分區管制規定,係就各使 用項目之使用行為加以區別,及建築物使用類組及 變更使用辦法(下稱本辦法)就建築物使用強度與 危險指標所訂之建築物使用類組之分類規定有 別。至所詢飲酒店業之行業別非屬本辦法第2 條所 稱之建築物使用類組,該行業所設置之場所,應依 上開辦法規定之類組定義與使用項目舉例,歸類分 組」。被彈劾人黃崇典上開之辯詞,無非規避中央 公共安全主管機關內政部營建署之法令函釋,刻意 採經濟部商業司之公司行號營業分類表,顯非允 當。再觀諸都市計畫法對於酒吧並無「有、無女陪 侍」之分,及都市計畫法臺灣省施行細則第15 條 規定住宅區係「保護居住環境」而劃定,不得為酒 吧等足以發生「噪音、振動或有礙居住安寧、公共 安全或衛生」之類似營業場所使用,法條意旨甚為 明確,被彈劾人所辯係屬卸責之詞,殊不足採。 (二)復查,內政部88 年5 月5 日營署建字第57850 號 函略以:「PUB」係「供娛樂消費,處封閉或半封 閉場所」為B-1 類組,至「酒吧」則為「供不特定 人士餐飲,且直接使用燃具之場所。但餐飲場所 所營業時間超過正常用餐時間,且設舞台或舞池 或類似空間,提供表演節目或歌唱者,歸屬B-1 類 組」業有明定,爰本案之ALA PUB 應歸屬為B-1 類, 殆無疑義。再徵諸本案業者所提之台中市建築物防 火避難設施與設備安全檢查申報結果書95 年度(附 件13,第49~52 頁)、96 年度(附件14,第53~
13
54 頁)及99 年度(附件15,第55~64 頁)之現況用 途類組皆為B1 組商業類,此有該申報結果書在卷 可按;另據台中市地方稅務局函復,依據娛樂稅法 第2 條規定,營業人有提供娛樂設備或設施供人娛 樂者,均應課徵娛樂稅,本案哈克飲料店(ALA PUB)其娛樂稅籍設立日期為88 年10 月1 日,申 請之營業項目為餐館業附設卡拉OK,自88 年10 月 1 日起以查定方式課徵娛樂稅(15%)在案(附件 16,第65~66 頁),在在顯示被彈劾人黃崇典企圖 掩飾其未將違規業者依法究辦之違失,所辯洵無可 採。 (三)被彈劾人黃崇典身為建築管理及土地使用分區之 權責機關首長,明知轄內ALA PUB 長期違規營業, 竟未善盡督導之責,致釀重大災害慘劇,要難辭違 失之咎。核其所為顯已違反公務員服務法第1 條: 「公務員應遵守誓言,忠心努力,依法律命令所 定,執行其職務。」、第5 條:「公務員應誠實清 廉,謹慎勤勉,不得有驕恣貪惰,奢侈放蕩,及 冶遊賭博,吸食菸毒等,足以損失名譽之行為。」 及第7 條:「公務員執行職務,應力求切實,不得 畏難規避,互相推諉,或無故稽延。」等規定。 二、朱蕙蘭部分: 被彈劾人朱蕙蘭對於上開違失事實坦承不諱,於 本院詢問時亦陳稱:「我會辭職是因為個人認為需負 政治責任……需負責任的是像我這樣政務人員…… 這件事我認為我需負責任是責無旁貸」(附件17,第 67~76 頁)。被彈劾人朱蕙蘭身為台中市商業管理權 責機關之首長,明知轄內ALA PUB 長期違規營業,對 於由該局主導之聯合稽查小組作業,竟未善盡督導之 責,致該聯合稽查小組之功能嚴重失靈,任各相關機
14
關間橫向聯繫付之闕如,因循怠忽,致釀災害慘劇, 洵難辭違失之咎。核其所為顯已違反上開公務員服務 法第1 條、第5 條及第7 條等規定。 三、吳青芳部分: 被彈劾人吳青芳於本案火災發生前長期擔任台中 市消防安檢主管機關之首長,非但未能本於專業,督 促所屬切實辦理消防安全檢查,致本案業者雖歷數十 次消防檢查均為合格,仍發生火災造成9 死12 傷之重 大慘劇,自難免予外界消防安檢流於形式之訾議;對 於本案業者於店內大量採用易燃泡棉,亦欠缺消防意 識,未予督導改善。甚至明知本案業者於斷水斷電期 間仍違規營業,竟知情不報,違反「台中市特定目的 事業停止供水供電及強制拆除作業要點」至為灼然。 被彈劾人吳青芳於本院詢問時,猶飾詞佯稱對業者前 遭斷水斷電毫無所悉,並推稱斷水斷電期間違法營業 行為乃警察局應負之查報責任云云(附件18,第77 ~84 頁),顯未據實說明,推諉卸責,嚴重怠忽職 守,洵非身為消防首長應有之處事態度,實難辭違失 之責。核其所為顯已違反上開公務員服務法第1 條、 第5 條及第7 條等規定。
綜上論結,台中市政府都市發展局局長黃崇典、經 濟發展局局長朱蕙蘭、消防局副局長吳青芳,均明知轄 內哈克飲料店(招牌ALAPUB)長期違規營業,竟未積極督 促所屬妥善處理,嚴重懈怠職守,肇致於100 年3 月6 日 凌晨發生火災,釀成9 死12 傷之重大傷亡慘劇,經核均 有重大違失,被彈劾人等違失情節事證明確,核與公務 員服務法第1 條、第5 條及第7 條所定,公務員應「依法 律命令所定執行其職務」、「謹慎勤勉」及「執行職務應 力求切實」等規定有違,並有公務員懲戒法第2 條之應受
15
懲戒事由,爰依憲法第97 條第2 項及監察法第6 條之規 定提案彈劾,並移請司法院公務員懲戒委員會審議,依法 懲戒。
其他附記事項:被彈劾人適用之法條條文摘錄 名稱:公務員服務法 第 1 條 公務員應遵守誓言,忠心努力,依法律命令所定, 執行其職務。 第 5 條 公務員應誠實清廉,謹慎勤勉,不得有驕恣貪惰, 奢侈放蕩,及冶遊賭博,吸食菸毒等,足以損失 名譽之行為。 第 7 條 公務員執行職務,應力求切實,不得畏難規避,互 相推諉,或無故稽延。
FD06145 | 2011_台湾_台中阿拉夜店火灾_监察院调查报告.pdf
分类:06_境外及港澳台调查报告 | 年份:2011 | 地域:台湾 | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
1
調查意見 本件ALA PUB夜店火災案係於民國(下同)100年3月6 日凌晨1時24分發生在台中市西區中興里中興街4巷○號 哈克飲料店(招牌名稱:ALA PUB,傑克丹尼PUB店)。 本案建築物登記面積僅51.73M 2,內部空間狹小擁擠,案 發當時店內人數眾多,表演者於夾層鋼管舞台使用自製L ED壓克力棒前端加上筒狀火花點燃後,手持LED壓克力棒 後端金屬鍊子快速旋轉以製造特效,甩出之火花不慎引 燃夾層鋼管表演台正上方附近隔音泡棉,因隔音泡棉為 易燃物質火勢迅速延燒,及因逃生門緊閉,在場觀眾逃 生不及,因而造成9人死亡、12人輕重傷之傷亡慘劇。有 關本件火災案台中市市長及各級相關主管單位人員有無 違失,業經本院調查竣事,茲臚陳調查意見如下: 一、台中市政府都市發展局違失部分: (一)台中市政府都市發展局放任業者長期違反都市計畫 法設於住宅區內經營PUB酒吧,竟未積極依法取締 拆除,致釀災害慘劇,洵有重大違失。 1、按都市計畫法第79條規定:「……違反本法或內 政部、直轄市、縣(市)(局)政府依本法所發布之 命令者,當地地方政府或鄉、鎮、縣轄市公所得 處其土地或建築物所有權人、使用人或管理人新 臺幣六萬元以上三十萬元以下罰鍰,並勒令拆 除、改建、停止使用或恢復原狀。……」、同法 第80條規定:「不遵前條規定拆除、改建、停止 使用或恢復原狀者,除應依法予以行政強制執行 外,並得處六個月以下有期徒刑或拘役。」又都 市計畫法臺灣省施行細則第15條規定:「住宅區 為保護居住環境而劃定,不得為下列建築物及土 地之使用:……十一、舞廳(場)、酒家、酒吧 (廊)、特種咖啡茶室、浴室、妓女戶或其他類
2
似之營業場所。……十五、其他經縣市政府認為 足以發生噪音、振動、特殊氣味、污染或有礙居 住安寧、公共安全或衛生並公告限制之建築物或 土地之使用」。準此,住宅區不得為酒吧(廊) 等類似營業場所之使用,違反規定者得依上開都 市計畫法第79、80條規定處分,合先敘明。 2、次按加強建築物公共安全檢查及取締執行要點 (內政部87年11月9日訂定、91年6月14日修正) 第2點規定:「直轄市、縣 (市) 主管建築機關應 集中人力,優先執行建築物公共安全檢查簽證及 申報業務……」、第4點規定: 「……各級目的事 業主管機關並應就負責稽查取締項目,確實依照 各該主管法規處理」。另依同要點附表二明文規 範:所謂B-1類之建築物係指「供娛樂消費,處封 閉或半封閉場所」。(應清查業別:PUB。)並列 為第一順序。至於B-3類則係指「供不特定人士餐 飲,且直接使用燃具之場所。但餐飲場所營業時 間超過正常用餐時間,且設舞台或舞池或類似空 間,提供表演節目或歌唱者,歸屬B-1類組」。 (應清查類別:酒吧。備註:酒吧原列第一順 序。)。據此,依上開規定無論「PUB」或「酒吧」 均屬B1類組,並屬第一順序加強檢查之營業場 所,各縣市政府應依法執行檢查及取締不法。 3、再按內政部營建署88年5月5日營署建字第57850 號函有關建築物使用為「PUB」之場所辦理建築物 公共安全檢查簽證及申報,應採何種類組標準辦 理申報略以:「『PUB』係『供娛樂消費,處封閉 或半封閉場所』為B-1類組,至『酒吧』則為『供 不特定人士餐飲,且直接使用燃具之場所。但餐 飲場所所營業時間超過正常用餐時間,且設舞台
3
或舞池或類似空間,提供表演節目或歌唱者,歸 屬B-1類組』業有明定」。爰此,本案之ALA PUB 應歸屬為B-1類,殆無疑義。 4、查據台中市政府對於住宅區得否設置酒吧之說 明,該府都市發展局陳稱:「……哈克飲料店(A LA PUB)之營業項目為飲酒店業,都市計畫科依 經濟部商業司公司行號營業項目分類表,歸納飲 酒店業屬飲食業,與特殊娛樂業中所指有女陪侍 之酒家等不同,故都市計畫科以其未違反都市計 畫法相關規定函復使用管理科辦理」,爰該局則 未對ALA PUB業者進行後續裁罰事宜。 5、惟查,據內政部營建署97年7月7日營署建管字第 0970037713號函謂:「……行政院主計處訂頒之 『中華民國行業標準分類』,主要係提供作為統 計資料分類之使用,並以各該場所單位之主要經 濟活動作為分類基礎,與都市計畫土地使用分區 管制規定,係就各使用項目之使用行為加以區 別,及建築物使用類組及變更使用辦法(下稱本 辦法)就建築物使用強度與危險指標所訂之建築 物使用類組之分類規定有別。至所詢飲酒店業之 行業別非屬本辦法第2條所稱之建築物使用類 組,該行業所設置之場所,應依上開辦法規定之 類組定義與使用項目舉例,歸類分組」。都市發 展局上開之辯詞,無非規避中央公共安全主管機 關內政部營建署之法令函釋,刻意採經濟部商業 司之公司行號營業分類表,顯非允當。再觀諸都 市計畫法對於酒吧並無「有、無女陪侍」之分, 及都市計畫法臺灣省施行細則第15條規定住宅區 係「保護居住環境」而劃定,不得為酒吧等足以 發生「噪音、振動或有礙居住安寧、公共安全或
4
衛生」之類似營業場所使用,法條意旨甚為明 確,都市發展局所辯係屬卸責之詞,殊不足採。 6、再查,本案業者所提之台中市建築物防火避難設 施與設備安全檢查申報結果書95、96及99年度之 現況用途類組均為B1組商業類,此有該申報結果 書在卷可按;另據台中市地方稅務局函復,依據 娛樂稅法第2條規定,營業人有提供娛樂設備或 設施供人娛樂者,均應課徵娛樂稅,本案哈克飲 料店(ALAPUB)其娛樂稅籍設立日期為88年10月1 日,申請之營業項目為餐館業附設卡拉OK,自88 年10月1日起以查定方式課徵娛樂稅(15%)在 案,在在顯示台中市政府都市發展局企圖掩飾其 未將違規業者究辦之違失,推諉卸責,確有不當。 7、揆諸上情,台中市政府都市發展局放任業者長期 違反都市計畫法設於住宅區內經營PUB夜店至為 明顯,該違規之行為本應按都市計畫法第79條規 定處新臺幣6萬元以上30萬元以下,並勒令拆 除、改建、停止使用或恢復原狀,該局竟未依法 處置,致釀災害慘劇,洵有重大違失。 (二)本件案址建築物並無使用執照,亦未申請變更使用 執照,台中市政府都市發展局竟任由業者經營PUB 酒吧,未能依法處理,核有重大違失: 1、按建築法第70條第1項規定:「建築工程完竣後, 應由起造人會同承造人及監造人申請使用執 照……」。第72條規定:「供公眾使用之建築物, 依第七十條之規定申請使用執照時,直轄市、縣 (市)(局)主管建築機關應會同消防主管機關檢查 其消防設備,合格後方得發給使用執照」。所謂 供公眾使用之建築物,依同法第5條之規定:「本 法所稱供公眾使用之建築物,為供公眾工作、營
5
業、居住、遊覽、娛樂及其他供公眾使用之建築 物。」而針對建築法施行前已建成之公眾使用建 物,第96條亦要求其所有權人「應申請核發使用 執照」。又第77條第1項規定:「建築物所有權人、 使用人應維護建築物合法使用與其構造及設備安 全」。所謂「合法使用」,依內政部95年7月17 日台內營字第0950804329號函,係指「建築物應 符合其現況用途之構造與設備標準」。至違反第7 7條第1項規定者,應依同法第91條第1項第2款之 規定,處建築物所有權人、使用人6萬元以上30 萬元以下罰鍰;仍未改善或補辦手續而繼續使用 者,得連續處罰,並限期停止其使用。如有供營 業使用事實之建築物,其所有權人、使用人違反 第77條第1項有關維護建築物合法使用與其構造 及設備安全規定致人於死者,處1年以上7年以下 有期徒刑,得併科新臺幣1百萬元以上5百萬元以 下罰金;致重傷者,處6個月以上5年下有期徒 刑,得併科新臺幣50萬元以上250萬元以下罰 鍰。 2、次按臺中市建築管理自治條例(97年2月14日修正 通過)第35條規定:「60年12月22日本法修正公 布前已領有建造執照之建築物,得檢附下列文 件,申請補發使用執照……。前項建築物之防火 避難設施及消防設備,應依舊有建築物防火避難 設施及消防設備改善辦法改善完成」;同條例第3 7條規定:「依第34條、第35條規定申請補發使用 執照之建築物用途,應符合都市計畫法及有關法 令之規定」。準此,本案建築物其現況供作「酒 吧」、「PUB」用途,屬供公眾使用之建築物,應 依同法第96條及第76條規定申請核發使用執照並
6
變更使用執照,否則將構成違法使用,得依同法 第77條第1項、第91條之規定處罰。 3、有關本案建築物是否依法申請使用執照乙節,台 中市都市發展局陳稱:「本案建築物為民國60年1 2月22日建築法修正前建造完成之舊有合法建 物。有關ALA PUB建築物依『原有合法建築物防火 避難設施及消防設備改善辦法』之歷年申請並輔 導改善情形,經查依前揭改善辦法,本件案址建 築物現況用途列為酒吧(B-3)類組場所,尚無依 該辦法申請改善之紀錄」云云。 4、惟查,該址(中興街4巷○號)相關地籍及稅籍資 料 ,該建物第 ,該建物第1次登記係50年1月25日,於88年7 月16日因買賣作第2次登記,目前所有權人為王 智慧女士,係屬「台中市建築管理自治 條例」第 」第3 4條所稱:「本法或實施都市計畫以外 市計畫以外地區建築物 管理辦法施行前,已建築完成之舊有建築物」, 前,已建築完成之舊有建築物」, 另依稅籍資料顯示, 顯示,該建物自86年 起課稅,樓層 起課稅,樓層 為2。惟實施建築管理前已 建造完成且未領有使 有使 用執照之合法建築物,該建築物雖屬舊有建築 物,無建造執照或使用執照可供研判現況夾層、 舞臺使用是否違規,但依建築法規定,實施建築 管理前已建造完成且未領有使用執照之合法建築 有使用執照之合法建築 物,如有建築法第73條第2項所指事項之變更者 者 (變更使用類組或有 組或有第9條建造行為以外主要構 為以外主要構 造、防火區劃、防火避難設施、消防設備、停車 空間及其他與原核定使用 不合之變更) )按內政部 營建署93年10月14日臺內營字第0930086992號函 釋意旨,應依建築法第96條及台中市建築管理自 自 治條例之規定,申請核發使用執照後,辦理變更 使用執照。
7
5、綜上,本案建築物為民國60年12月22日建築法修 正前建造完成之舊有合法建築物,依法應申請核 發使用執照,辦 理變更使用執照。又業者經營 使用執照。又業者經營 「酒吧」「PUB」屬供公眾使用建築物之範圍,更 應依建築法等規定申請核發使用執照,惟台中市 政府都市發展局應作為而不作為,未曾有要求業 者依法申請改善,並任由業者違規經營「酒吧」 「PUB」,未能依上開法令嚴格把關,核有重大違 失。 (三)台中市都市發展局未落實追蹤業者「建築物防火避 難設施與設備安全檢查」申報之後續改善情形,核 有重大違失: 1、按加強建築物公共安全檢查及取締執行要點第4 點:「直轄市、縣 (市) 主管建築機關接獲違法 (規) 營業場所通報後,應立即通知該建築物所 有權人、使用人限期辦理建築物公共安全檢查簽 證及申報,逾期未申報或檢查申報不合格者,依 建築法第九十一條規定處理」;建築物公共安全 檢查簽證及申報辦法第5條(民國99年5月24日修 正後第5條,修正前第7條):「申報人應備具申 報書及檢查報告書向當地主管建築機關申 報。」、第7條 1規定:「……三、經查核不合格 者,應詳列改正事項,通知申報人,令其於接獲 通知之日起三十日內改正完竣,並送請復核(第1 項)。未依前項第二款規定改善申報,或第三款 規定送請復核或復核仍不合規定者,當地主管建
1 99年5月24日修正前第8條規定:「直轄市、縣 (市) 主管建築機關收到前條之申報書及檢查 報告書之日起,應於十五日內審查完竣,經審查合格者,即通知建築物公共安全檢查申報人; 經審查不合格者,應將其不合規定之處,詳為列舉,一次通知改善。建築物公共安全檢查申 報人應於接獲通知改善之日起三十日內,依通知改善事項改善完竣送請復審;逾期未送審或 復審仍不合規定者,主管建築機關應依本法第九十一條規定處理」。
8
築機關應依本法第九十一條規定處理(第2項)」 等規定,為辦理建築物公共安全檢查與申報之主 要法令依據。 2、次按同辦法第4條(民國99年5月24日修正前第3 條、第4條)附表規定,B類(商業類)建築物自86 年l月1日起,每年應辦理建築物公共安全檢查申 報乙次,期間為每年4月1日至6月30日。有關B-1 類「供娛樂消費,處封閉或半封閉場所」建物, 應每1年1次定期辦理公共安全檢查申報;有關B- 3類「供不特定人士餐飲,且直接使用燃具之場 所」,樓地板面積 地板面積300平 方公尺以上規模建物,應 方公尺以上規模建物,應 每1年1次定期辦理公共安全檢查申報。有關B-1 與B-3類申報差異,在於B3類需達樓地板面積 地板面積300 平 方公尺以上規模建物才需申報 方公尺以上規模建物才需申報,未達300平 方公 方公 尺則不須申報 申報。 3、查本案歷年ALAPUB業者委託專業檢查人辦理公共 安全檢查申報結果,僅有95、96、99年3次紀 錄,並無97、98年之建築物公共安全檢查申報紀 錄,詢據該局陳稱:「依據建築物公共安全檢查 簽證及申報辦法,供公眾使用之建築物應由建築 物所有權人、使用人定期委託專業檢查人檢查簽 證並辦理申報,惟查,本案場所使用人或所有權 人未於97及98年度辦理申報,故無資料」云云。 都市發展局既明知申報資料有所闕漏,卻未督促 業者申報或主動查知,顯係對公安申報制度未予 重視,其管理之疏失有待深入檢討。 4、次查本案業者王○○於95年(申報日期95年4月2 日)之建築物防火避難設施與設備安全檢查申報 書中載明現況用途類組:B1;商業類:娛樂場 所。備查結果:准予報備,列管定期檢查,並於
9
95年6月30日前改善再行申報。該次改善計畫書 中明列:1、二樓未設置緊急進口。 未設置緊急進口。2、內部裝修 材料使用易燃材料。3、無戶外安全梯。4、防火 區劃防火樓板使用易燃材料 板使用易燃材料。5、非防火區劃分間 牆使用易燃材料。等5項無法合格理由,業者並切 結於95年6月30日前改善完竣後再行申報。該府 嗣於95年9月19日函請再次辦理申報,業者置之 不理,遂於95年11月23日以府都管字第09502442 71號函裁罰業者新台幣6萬元罰鍰(理由:未於規 定期限內委託專業檢查機構或人員向本府都市發 展局辦理建築物公共安全檢查簽證及申報作 業)。 5、復查本案業者王○○於96年(申報日期96年7月3 0日)之建築物防火避難設施與設備安全檢查申報 書中載明現況用途類組:B1;商業類:娛樂場 所。備查結果:准予報備,列管定期檢查,並於 96年9月15日前改善再行申報。該次改善計畫書 中明列:1、二樓未設置緊急進口。 未設置緊急進口。2、內部裝修 材料使用易燃材料。3、無戶外安全梯。4、防火 區劃防火樓板使用易燃材料。 板使用易燃材料。5、非防火區劃分間 牆使用易燃材料。6、直通樓梯無壁體之側面未裝 梯無壁體之側面未裝 設扶手。7、避難層出入口寬度不足。等7項無法 合格理由,並提改善計畫於一個月內改善完成後 再行申報。然查業者並未依法再次申報,台中市 政府亦未追查後續改善情形,洵有失當。 6、再查本案業者於99年度申報係委託「中邦建築物 公共安全檢查有限公司」執行建築物防火避難設 施與設備安全檢查,並於99年6月30日檢送「建築 物防火避難設施與設備安全檢查申報書」予該府 都市發展局使用管理科,依據該次申報書之現況
10
用途類組載明:B1(KTV),原核准類組:H2(住 宅),以及使用執照字號:50年;舊有建物無使 照(詳謄本)。該次檢查計有「內部裝修材料」 乙項為不合格,檢查人候明輝,並於「專業檢查 人綜合意見及簽證」欄位註明「不符合規定,但 提具改善計畫及自行改善期限,請准予備查」, 不合格之理由為「內部裝修材料部分採用易燃建 材施作(見防火避難設施簡圖圖示CB 2處)」,另提 出「依則設88條(指「建築技術規則建築設計施工 編」第88 條)規定需採用符合耐燃建材規定之防 火建材施作」之改善計畫。嗣該局收件後,由計 管小組於99年7月12日登錄列管(加蓋「違規檔案 管理專用章」),復於備查結果註明「准予報備, 列管定期檢查,並於99年8月10日前改善,再行 申報」。揆諸上情,該次檢查報告存有諸多疑 點,惟該業者遲未重行提出申報,都市發展局亦 未追蹤後續改善情形及依建築法第91條規定進行 裁處,遂致該建物之天花板採用易燃建材施作之 缺失未予改善,致釀重大傷亡,對照本案火場鑑 定報告書,該建築物天花板及牆壁使用大量易燃 隔音泡棉,故不慎引燃後迅速延燒並成為本次重 大火災事件之起火點等情,在在顯示台中市政府 都市發展局敷衍塞責,未能善盡落實追蹤業者安 檢申報之後續改善情形,核有重大違失。 (四)本案業者於斷水斷電期間仍有營業情事,台中市政 府未依建築法第94條之1規定以及加強建築物公共 安全檢查及取締執行要點處置,違失情節,非比尋 常,要難辭其咎:
2 按CB處所拍即為該建物之天花板。
11
1、按建築法第94條之1:「依本法規定停止供水或供 電之建築物,非經直轄市、縣、(市)(局)主管建 築機關審查許可,不得擅自接水、接電或使用; 未經許可擅自接水、接電或使用者,處一年以下 有期徒刑、拘役或科或併科新臺幣三十萬元以下 罰金」。另依加強建築物公共安全檢查及取締執 行要點第5點第3項:「經停止供水、供電建築 物,未經許可擅自接水接電或使用者,除得依建 築法第九十一條規定,連續處以新臺幣六萬元以 上三十萬元以下罰緩外,並依建築法第九十四條 之一規定辦理」等規定甚明。 2、查本案ALAPUB於97年3月6日聯合稽查時,經台中 市政府都市發展局認定涉有「避難層出入口寬度 不符」等缺失,該局遂於97年3月17日科予罰緩並 命令停止使用,惟該業者自始未依限改善,復經 該府於97年4月16日再次聯合稽查時,發現該業 者仍有違規營業使用之情形,該局遂於同年5月8 日簽准執行斷水斷電,並函請各有關機關追蹤列 管。嗣經台中市警察局第一分局於97年11月5日2 2時25分執行臨檢勤務時發現,該業者經執行斷 水斷電後仍持續營業,旋於97年11月7日以中分 一行字第0970035342號函移請該府都市發展局依 權責處理,並檢送臨檢紀錄表影本(經店家在場 負責人簽名確認無訛),此有台中市警察局第一 分局函在卷可稽。 3、該府都市發展局使管科於同年11月10日接獲警察 單位之通報業者擅自接水接電之紀錄後,竟未有 任何積極具體作為,僅於同年11月17日之來函簽 擬「一、本案已申請辦理建物恢復使用手續,使 管組轄區並於97年11月13日辦理現勘(目前停業
12
中)如后附件。二、呈閱後文存」,未依上開建築 法第94條之1及「加強建築物公共安全檢查及取締 執行要點」之規定將業者函送法辦追究其刑責, 違失情節,非比尋常,要難辭其怠職之咎。 (五)本案業者申請復水復電時,台中市政府竟無視警察 局之會簽意見(業者已有先行營業情事),理應先行 移送法辦,然逕簽請同意該業者復水復電,草率行 事,肇致重大災害,違失情節匪輕,洵難辭其咎: 1、按「台中市建築物恢復使用及供水供電審查作業 要點」第8點第1項第2款:「因違規供作八大行業 或電子遊戲場使用並經本府執行停止供水供電或 拆除室內裝修者,現場會勘應依下列規定辦 理:……(二)營利事業設施、設備、營業現況:原 違規營業場所生財器具已拆除並已歇業」、第10 點:「本府都市發展處得將申請人檢附之圖說、 照片及證件資料,送請相關單位查證,如有虛偽 不實者,得予駁回,並移送相關單位處理」。審 諸上開規定,本案ALA PUB於97年5月8日經該府 都市發展局簽准執行斷水斷電後,如欲再申請恢 復使用及供水供電,則須依上開規定將違規營業 場所之生財器具拆除並處於歇業狀態始得獲准, 如有虛假得予駁回。 2、惟查,該業者係於97年11月10日向該府都市發展 局使用管理科提出申請建物恢復使用及供水供 電,經該局於同年11月13日會同該府經濟發展局 及消防局人員前往會勘後,並於同日簽會消防 局、警察局及經濟發展局等單位,請該等單位查 明並提供該業者歷年來之違規紀錄及處理情形。 其中,該局使管科於簽請警察局提供資料時,並 特別註明「該場所是否有先行營業之情事」乙項。
13
3、次查,警察局於同年11月19日簽復市府都市發展 局內容略以:「……第一分局於97年11月5日、9 7年11月8日依『台中市政府針對經斷水斷電仍私 自恢復營業之商家執行作業流程』對該址實施複 查,已有先行營業情形,並於97年11月6日(按: 經查原文誤植,實際日期應為97年11月7日)以中 分一行字第0970035342號函報市府相關單位查處 在案」。詎料,都市發展局竟未詳實引述警察局 之會簽意見,刻意遺漏該業者早有多次違規先行 營業遭查獲之事實,復按消防局於業者斷水斷電 期間進行安檢時(97年6月8日、7月25日)亦連續 發現業者2次違規營業之事實。基此,都市發展 局非但未覈實查明確認該業者是否確已符合恢復 供水供電之「歇業」要件,且逕以同年11月13日 上午9時之會勘結果即認定「現址停業中」,嗣於 同年11月20日綜簽該府一層略以:「……二、本 案經會簽本市消防局、本市警察局、本府經濟發 展處該場所歷年來紀錄及處理情形相關資料如 后……經本府97年11月13日辦理現場聯合會勘 後,尚符規定……五、有關本案申請恢復使用及 供水供電是否會再違規乙節,已由申請人王智慧 君切結『除依核准建築物使用執照所載用途使用 外,絕不自行或租賃他人為違反原核准用途之營 業場所或使用,倘若違背願受最嚴厲之處分,願 負一切法律責任,並放棄先訴抗辯權』,另經申 請人出具說明未來供『住家』使用」,嗣經副市 長蕭○○簽註:「申請依原核准用途使用,同意 所請,唯繼續追蹤其使用。」以市長胡○○(甲) 章核定後,於97年12月5日以府都管字第0970282 239號函同意業者在該址建築物恢復使用及供水
14
供電。 4、台中市政府明知業者遭斷水斷電期間已有先行違 規營業之情事,理應先行移送法辦,然竟同意業 者復水復電,草率行事,肇致重大災害慘劇確有 違失,相關承辦及主管人員嚴重怠忽職守,洵難 辭其咎。 (六)本案97年12月5日復水復電後,都市發展局於98年1 月16日聯合稽查時,再度發現違規,該局竟未依台 中市特定目的事業停止供水供電及強制排除作業要 點處置,縱容業者繼續營業,致釀重大傷亡慘劇, 要難辭懈職之責: 1、按「台中市特定目的事業停止供水供電及強制拆 除作業要點」第2點:「本要點指稱之特定目的事 業,係為行政院頒『維護公共安全方案』優先執 行之第一、二順序行業,為本府查察取締執行目 標。」、第8點:「對於曾經本府停止供水供電之 特定目的事業場所,經申請審查許可恢復建築物 使用、供水供電者,經各主管機關複查後,仍 『繼續營業』或以更換負責人方式繼續營業,並 經再次勒令停止使用者,得由各目的事業法令主 管機關簽奉市長核可後,移由本府都市發展局依 法定程序會同相關單位執行停止供水供電及強制 拆除處分。」等,對於違規使用建物經斷水斷電 後仍繼續營業之相關處置程序與方式,規定甚 明。 2、經查本案業者於97年11月10日申請恢復使用及供 水供電時提出「本屋坐落台中市西區中興4巷○號 1樓 ,日後恢復住家用途」之說明,惟該址於 ,日後恢復住家用途」之說明,惟該址於97 年12月5日該府許可復水復電後,稽查人員於98 年1月16日前往聯合稽查時,再度發現業者違規
15
使用建築物且現場備有樂隊演唱台,另於99年8 月19日都市發展局再次前往聯合稽查時,該業者 除「違規使用建築物」外,亦涉有「未維護建築 物構造及設備安全」等違規情事,上開相關稽查 紀錄分別於98年1月19日以府經商字第098001633 7號函,及99年8月23日府經商字第0990241403號 函移請各權責單位進行處理在案,此有上開兩函 在卷可考。 3、第查,業者自97年12月5日獲准復水復電後,迄1 00年3月6日發生火災達2年4個月期間,仍然重操 舊業,經營PUB夜店,並未如其所述供「住家」使 用,該府本應追蹤其實際使用情形,發現違法則 應即撤銷業者復水復電之處分並依法移送法辦, 始為正確。惟台中市政府明知業者已違規使用, 非但未予撤銷法辦,且於上開重操舊業期間多次 稽查,均視而不見,如此草率行事,無非另有隱 情,殊值質疑,相關承辦及主管人員嚴重懈職, 釀成重大傷亡慘劇,其情節匪輕,實難辭其咎。 (七)台中市政府於本案業者復水復電後之歷次聯合稽查 ,針對該址建物之使用類別均不予分類或改列為B- 3類,有違「加強建築物公共安全檢查及取締執行要 點」第5點及附表等規定,涉有迴護包庇業者之嫌, 顯有重大違失: 1、查該府歷次相關聯合稽查紀錄顯示,都市發展局 於97年5月8日對該業者執行斷水斷電前之聯合稽 查紀錄(97年3月6日)係認定其為B-1類,並據以 執行斷水斷電,惟97年12月5日業者復水復電後, 歷次聯合稽查紀錄竟未予分類或改列為B-3類, 茲分次列舉本案歷次聯合稽查紀錄如下:96年12 月13日,B-3類;97年3月6日,B-1類;97年4月1
16
6日,B-1類;98年1月16日,未認定;98年3月5 日,未認定;99年8月19日,B-3類;99年10月1 日,未認定;100年l月21日,未認定;100年2月 11日,B類。綜上,該局逕自降低公安檢查標準 或未予認定、聯合稽查不確實,灼然可見。 2、復查,該業者於97年間遭斷水斷電即係因其建物 經該府都市發展局於聯合稽查時認定屬B-1類營 業場所,相關公安檢查較為嚴格之故 (97年3月6 日之聯合稽查結果即認定業者「未維護建築物構 造及設備安全合法使用」)。申言之,本案系爭建 物係60年12月建築法修正公布前(建築物第1次登 記於50年1月25日)所建之2層樓「舊有建築物」「舊有建築物」(現 改稱「原有合法建築物」),依據內政部營建署訂 頒之「原有合法建築物防火避難設施及消防設備 改善辦法」附表一規定B-1類建物應設「避難層以 外樓層出入口」及「屋頂避難平台」等項,而 台」等項,而B- 3類建物則無此要求。爰此,本案業者經復水復電 後,仍於該址重新營業,其經營型態亦未改變, 惟該府都市發展局於聯合稽查時竟將該建物逕更 改為B-3類或未予分類,恣意降低公安檢查之標 準,有違「加強建築物公共安全檢查及取締執行 要點」第5點及附表等規定,並涉有迴護包庇業者 之嫌,顯有重大違失。 二、台中市政府經濟發展局違失部分: (一)97年5月8日業者遭斷水斷電期間,經濟發展局未依 商業登記法第7條規定辦理,實有重大違失: 1、按97年1月16日新增之商業登記法第7條規定: 「商業之經營有違反法律或法規命令,受勒令歇 業處分確定者,應由處分機關通知商業所在地主 管機關,廢止其商業登記或部分登記事項」。其
17
新增理由:商業之經營有違反目的事業主管機關 之法律或法規命令規定者,由各該目的事業主管 機關為勒令歇業處分;為利管理,爰明定於勒令 歇業之處分確定後,應由處分機關通知商業所在 地主管機關廢止其商業登記或部分登記事項。 2、經查,本案97年5月8日都市發展局通知本案業者 違反建築法規定斷水斷電等處分情事,復按警察 局於97年11月5日、97年11月8日發現業者在斷水 斷電期間仍擅自違規接水電營業之函告,經濟發 展局接獲都市發展局、警察局之通知後理應依商 業登記法第7條規定辦理廢止其商業登記,竟未 依法積極處理,縱容業者彰彰明甚,核有重大違 失。 (二)經濟發展局係聯合稽查小組主辦機關,非但未善盡 責任發揮聯合稽查之功能,且推諉塞責致釀災害, 核有重大違失: 1、按「台中市政府違規視聽歌唱等七種行業聯合稽 查作業守則」(97年5月23日簽奉市長核定,97 年6月27日起實施)係依據經濟部89年9月發布「維 護公共安全方案—營利事業管理部分」實施要項 訂定之。該守則中規定:「……貳、目標:執行 取締違規視聽歌唱、理髮、三溫暖、舞廳(場)、 酒家、酒吧、特種咖啡茶室等違法業者,以確保 公共安全,提高生活品質,保障民眾之福 祉。……參、編組:一、由商業單位負責主導, 得會同都市計畫、建築管理、消防、環境保護、 衛生等相關機關各依權責及主管法令配合檢查, 並得視需要請警察機關協助。……陸、稽查重 點:一、設施違規與公共安全部分,依內政部維 護公共安全方案「營建管理」、「消防管理」規
18
定查處。二、營利事業登記方面,依台中市休閒 娛樂服務業設置自治條例及商業登記法規定查 處」。 2、次按「台中市政府針對斷水斷電之商號仍私自恢 復營業之商家執 行作業流程」,對於已辦理建築 程」,對於已辦理建築 物恢復使用者,由經濟發展局於3日內排入聯合 稽查認定其營業項目後,都市發展局如認為該營 業項目違反建築物使用用途規定,則依建築法第 91條規定處罰鍰及限期改善,改善期限屆滿後3 日內由經濟發展局再排入聯合稽查,仍未改善者 由都市發展局依上開建築法之規定處罰鍰並勒令 停止使用後,經濟發展局3日內再排入聯合稽 查,仍未改善者由經濟發展局於1週內簽奉市長 核准,再由都市發展局於1週內執行斷水斷電或 拆除。惟查,警察局於97年11月7日通知經濟發 展局謂:ALA PUB於斷水斷電期間仍擅自營業,經 濟發展局竟未依上開遭斷水斷電仍私自恢復營業 營業 之商家執 行作業流程之規定,於 程之規定,於3日內排定聯合 合 稽查,殊有失當。 3、再徵諸經濟發展局身為聯合稽查小組主辦機關, 合稽查小組主辦機關, 職司商業登記及商業管理事宜,惟查,該局長期 放縱業者違規營業於先,此有該府對視聽歌唱等 八種行業、電子遊戲場及資訊休閒業管理管制卡 違規紀錄足按,推卸責任陳稱該業者非商業登記 法所不准於後,此觀97年1月16日經濟部修改商業 登記法後,均無裁罰紀錄,或註記「未違反商業 登記」即明,顯然自棄商業管理責任。復於97年5 月8日後業者遭斷水斷電期間,理應依商業登記 法第7條據以廢止商業登記,或督促其辦理變更 登記,對於一層決行之復水復電會勘作業,仍始
19
終未表示意見。復依上開該府聯合稽查作業守則 中規定:「由商業單位負責主導,得會同都市計 畫、建築管理、消防、環境保護、衛生等相關機 關各依權責及主管法令配合檢查,並得視需要請 警察機關協助」。該局於聯合稽查小組中居主導 地位,未善盡主導之責,致該聯合小組功能失 靈,任各相關機關間橫向聯繫付之闕如,因循怠 忽,且推諉卸責,致釀災害,核有重大違失。 三、台中市政府消防局違失部分: (一)本案業者於97年斷水斷電期間仍違法營業,消防局 於97年6月8日、7月25日2次安全檢查時發現業者擅 自接水接電營業,該局竟未依法通報權責機關處理 ,核有重大違失: 1、按「加強建築物公共安全檢查及取締執行要點」 第6點:「消防單位執行消防檢查時,發現建築物 防火避難設施等有不符規定之公共安全事項,應 即時通報各目的事業主管機關及建築主管機關處 理,通報內容包括逃生通道、安全梯、安全門是 否堵塞及防火區劃是否破壞」;又「台中市特定 目的事業停止供水供電及強制拆除作業要點」第6 點:「建築主管機關自目的事業主管移送名冊之 日起三十日內排程,邀集目的事業主管機關、商 業、消防、環保、警察、電業、自來水等相關單 位配合依序執行。」、第7點:「執行完畢之違規 商號,由建築主管機關通知目的事業主管機關及 本府建設處、本市消防局、警察局追蹤複查列 管……」等,對於消防安檢之措施與後續處理規 定甚詳。 2、本案業者於97年5月8日至97年12月5日台中市政 府執行斷水斷電期間仍違法營業,消防局於97年
20
6月8日、7月25日執行 2次例行性消防安全檢查發 現業者擅自接水接電違法營業並未通報等情,詢 據台中市消防局副局長吳○○(時任台中市消防 局長)陳稱:「消防局不知道斷水斷電這件事。 也無通知我們。我相信同仁不清楚的。這是我們 台中市斷水斷電,回報有無營業是警察局查報 的,我們這裡不知道的」云云。惟查,台中市政 府97年5月5日通知各單位於同年5月8日配合執行 斷水斷電之公文正本載明台中市消防局,此有該 府都管字第0970105024號公文在卷可稽。再查, 97年5月8日當日執行評定違規商號建築物停止供 水供電強制拆除工作簽到表,台中市消防局災害 搶救課計有蕭○○、曾○○、廖○○、許○○等4 人簽名配合執行,有該簽到表在卷足證,該局副 局長吳○○聲稱不知情,顯係卸責之詞,又徵諸 吳副局長於84年2月15日衛爾康火災事件擔任該 市警察局消防警察隊隊長,長年於消防單位服 務,對於安檢通報業務理應熟稔,難謂不知,渠 所辯委無可採。 3、本案業者於斷水斷電期間脫法違規營業,都市發 展局既已函文通知消防局在案,然消防局2次例 行性安檢發現業者擅自接水接電違法營業,竟知 情不報,違反上開執行要點至為明確,本院詢問 時又佯稱是警察局查報的,未據實詳述,推諉卸 責,洵非身為消防首長應有之處事態度,要難辭 重大違失之責。 (二)消防局為該市消防安檢權責機關,允應以其專業協 助業者提供安全場所,然該局對ALA PUB曾經歷數 十次之消防檢查,卻均未就應改善消防之作法提出 建議,並督促業者改善,確有失當:
21
1、卷查台中市政府消防局針對本案營業場所之消防 安全設備、檢修申報、防火管理、防焰規制等, 5年內進行檢查共計21次(95年1月8日至100年2 月17日),除於99年7月1日檢查發現99上半年度 未依規定辦理檢修申報外(於99年7月16日複查合 格),其餘均合格。另近3年配合市府聯合稽查之 消防安全檢查及複查共計9次,近5年內消防安全 設備檢修申報共計10次(95年2次、96年2次、97 年2次、98年2次、99年2次),另台中市政府執行 斷水斷電期間(97年5月8日到97年12月5日),消 防局於97年6月8日、97年7月25日等2次違法營業 期間,辦理例行性消防安全檢查,由該局第七大 隊中港分隊執行,現場檢查結果均為合格。果真 如此,該場所豈會陡生大火,一夜之間奪去9條 寶貴生命?安檢草率了事,異於從未安檢者幾 希。 2、次查,本案場所之消防檢查標準,據台中市政府 消防局陳稱:該場所係依「實際使用用途」以甲 類第1目之酒吧場所列管,因該場所面積較小, 現場設有滅火器、標示設備、緊急照明燈、避難 器具(緩降機)、室內排煙設備等消防安全設備, 故尚符合規定云云,惟查據歷次消防安全檢查紀 錄,對於「防焰」窗簾、地毯等皆列為檢查項目, 然該店於天花板及牆壁大 量使用易燃吸音泡棉, 燃吸音泡棉, 消防局竟視若無睹,未本於專業督促該店採用具 防焰性質泡棉,或於泡棉外加裝其他防焰材料, 嚴重欠缺消防意識,並怠於行使職權,確有失 當。 四、台中市政府嚴重弱化公共安全督導會報,致該會報 徒具形式,未能發揮應有之防災功能:
22
(一)按「台中市政府維護公共安全方案督導會報設置要 點」第1點:「台中市政府為督導考核所屬機關執行 行政院頒維護公共安全方案各計畫,協調整體執行 作為,特設置『台中市政府維護公共安全方案督導 會報』以增進執行績效,加強維護民眾公共安全」 、第2點:「本會報任務如下:(一)審議、協調本 府所屬各機關所提『維護公共安全方案』各子方案 具體執行計畫」、第3點:「本會報置召集人1人, 由市長兼任……委員若干人,任期2年,由市長就 下列人員派〈聘〉兼之:……(五)經濟發展局局 長……(七)都市發展局局長……(十八)消防局 局長……」、第4點:「本會報每2個月召開會議1 次,必要時得召開臨時會」等規定甚詳。 (二)查台中市政府於100年3月15日所提出之「哈克飲料 店火災專案調查報告」中臚陳本案該市府都市發展 局具有:「放任業者長期違反都市計畫法設於住宅 區內經營PUB酒吧,未依法取締拆除」、「警察局通 報業者於斷水斷電後自接水電復業,卻未積極依法 查處」、「本案業者申請復水復電時,竟無視警察 局之會簽意見,仍簽請同意該業者復水復電」、「 本案業者復水復電後,該局於98年1月16日聯合稽 查時,再度發現違規,竟未依規定處置,縱容業者 繼續營業」、「曾認定其為B1營業場所斷水斷電, 但業者復業後經營型態未變,稽查人員逕自改列為 B3,致安檢標準降低」、「舊有建築無使用執照, 且變更使用未把關」以及「建築物公共安全檢查申 報未追蹤,建築物有易燃泡棉未處理」等7項違失; 經濟發展局具有:「業者於97年12月19日向該府申 請辦理營業項目變更登記,該局前於屢次稽查中皆 註記其為飲酒店類,顯示知其登記不實,理應同時
23
要求業者以實際經營業務項目變更,卻仍准其以不 實的營業項目辦理變更登記」、「警察局於97年11 月7日將ALA PUB於斷水斷電期間仍擅自營業情事通 知該局,該局卻未依『臺中市政府針對經斷水斷電 仍私自恢復營業之商家執行作業流程』之規定,於3 日內排定聯合稽查」及「身為聯合稽查小組主辦機 關,卻未善盡責任發揮聯合稽查之功能,任各機關 間橫向聯繫付之闕如」等3項違失;消防局具有:「 本案業者於97年斷水斷電期間仍違法營業,消防局 於97年6月8日、7月25日2次安全檢查時發現業者擅 自接水接電營業,該局竟未做好橫向聯繫通報都市 發展局」及「該店於天花板及牆壁大量使用易燃吸 音泡棉,消防局應本於專業提出建議,採用具防焰 性質泡棉,竟未為之」等2項違失。上開12項重大違 失,亦經該府民國100年3月15日之「哈克飲料店火 災專案調查報告」載明甚詳。 (三)復查「台中市政府維護公共安全方案督導會報設置 要點」係台中市政府為督導考核所屬機關執行行政 院頒維護公共安全方案各計畫,協調整體執行作為 而設置,期能增進執行績效,加強維護民眾公共安 全,此為該要點第1 點所明揭。又該要點第3 點及 第4 點規定,該會報任務係包括:「審議、協調本 府所屬各機關所提『維護公共安全方案』各子方案 具體執行計畫」等項,以及該會報置召集人1 人, 由市長兼任。台中市政府明知轄內違反土地使用分 區之違法營業家數眾多,竟未依行政院訂頒之維護 公共安全方案以及其子方案,切實執行該市有關建 築物公共安全管理業務,並督導都市發展局、經濟 發展局、消防局等密切配合辦理,對違法營業之業 者善盡管制、查報之責。
24
(四)台中市政府雖以「台中市政府維護公共安全方案督 導會報」已併入「台中市政府治安會報」辦理等情 詞置辯;惟查,「台中市政府治安會報設置要點」 第1 點規定:「台中市政府為有效維護台中市當前 治安,研擬防制犯罪對策,加強督導及管考,聯合 本府相關任務單位,集中各部門力量,發揮改善本 市整體治安功能,特設台中市政府治安會報,並訂 定本要點。」、第3 點規定:「本會報之任務如下: (一)治安政策與重大措施之協調、聯繫及規劃。 (二)治安工作之執行及督導。(三)檢討當前治安狀 況,消除影響治安因素工作之策劃、協調、推動、 執行及督導。(四)鼓勵民眾協助破案並頒發破案獎 金。(五)本會報決議事項之執行、管制及督考」。 審諸其任務、功能均與上開維護公共安全方案督導 會報明顯不同,縱使將上開兩會報合併辦理,惟ALA PUB 夜店違規營業依舊,並未發揮其合併統籌之功 能,以此斤斤置辯,顯係卸責。 (五)再徵諸本案發生後,內政部已於100 年3 月10 日、 11 日、12 日抽查台中市27 家業者(原計畫抽查41 家,但14 家未營業),僅2 家合格,25 家不合格, 合格率僅8%,明顯偏低,益見台中市政府帄時對 公共安全不予重視,並未切實督導,漠視人民生命 財產安全之寶貴性與脆弱性,肇致9 死12 傷之重大 傷亡事件。 五、 內政部違失部分: (一)有鑑於國內公共場所災難頻仍,行政院雖訂頒「維 護公共安全方案」,惟查其中「維護公共安全方案- 營建管理部分」、「維護公共安全方案-消防管理部 分」之主辦機關係內政部,並由內政部督導各縣市 政府執行以及維護全國公共場所之公共安全之責,
25
另按「維護公共安全方案」之目標為:「一、健全 公共安全法令及制度,以保障民眾之褔祉。二、確 實執行公共安全工作,以提高生活環境品質。三、 加強檢查公共安全設施,以防止意外事故發生。四 、加強公共安全教育宣導,以強化公共安全共識」 ,內政部肩負健全公共安全法令及制度,以保障民 眾之褔祉責無旁貸。 (二)茲由民國84年2月15日晚間7時許,位於台中市台中 港路上的「衛爾康」西餐廳發生歷來死傷最嚴重的 單一火災事件,造成64人死亡、11人受傷之重大公 安事故,全國輿論譁然,人心浮動,並導致時任總 統李登輝以國民黨主席身分向全民道歉,迄至100 年3月6日ALA PUB火災造成9死12傷嚴重慘劇觀之, 國內對於建築物高使用強度、高危險性之場所仍然 疏於管理,對於人民生命財產造成莫大威脅,衡諸 上開2次重大災害慘劇,如出一轍,均未落實各項防 範措施所致,足見上開公共安全方案之執行,仍頇 深入檢討,有效強化各項公共安全,方符人民期待 。 (三)又本案火災發生後,該部依據行政院公共安全管理 白皮書,督導各直轄市政府之公共場所公共安全檢 查業務,分別於100年3月10日、11日、12日抽查5 個直轄市共計抽查135家業者(原計畫抽查170家, 但35家未營業)合格家數僅15家,其中120家不合格 ,合格率僅11%。另台中市部分計抽查27家(原計 畫抽查41家,但14家未營業)僅2家合格,25家不合 格,合格率僅8%,此有該部抽查成果表可稽。揆諸 上開合格率偏低之情形,身為全國公共安全之主管 機關,自應不定期抽查督導,強力宣導並督促各縣 市政府重視公共安全,以維廣大民眾之生命財產安
26
全,俾讓人民安居樂業。 六、經濟部違失部分: (一)經濟部在相關配套措施未及建立情況下,於98年4 月13日起率爾廢除營利事業統一發證制度,洵難落 實「維護公共安全方案—營利事業管理部分」應辦 理之商業管理中有關公共安全事務,以鄰為壑,忽 視政府施政本一體之理念,亦罔顧公共安全之重要 性,過程草率,規劃欠周,核有違失: 1、查自87年起至98年間,行政院為研議廢除「營利 事業統一發證制度」之可行性,曾多次召開跨部 會之研商協調會議,於討論過程中,主辦機關經 濟部明知包括行政院研考會、行政院五組、內政 部營建署及消防署在內等諸多單位均表達強烈疑 慮,認為營利事業統一發證制度廢除後,恐怕非 但無法解決現有問題,反而將因都計、建管、衛 生、消防管理上產生困難致使違規之情況益加嚴 重等情。然經濟部商業司為求減輕其自身業務量 與責任,竟不顧相關反對意見,於相關配套措施 付之闕如之情況下,即積極推動該項制度之變 革,嗣並經行政院核定,自98年4月13日起貿然 實施新制,正式廢除在我國施行達半世紀之久之 營利事業統一發證制度。 2、次查有關維護公共安全方案,各部會均已研修各 項法規並據以執行,惟查,該部所管公司法以及 商業登記法大幅修訂後,對於商業「登記」之管 理,已難落實「維護公共安全方案—營利事業管 理部分」理應辦理之商業管理中有關公共安全事 務,該部對此部分,亦未見研修法令等具體措施, 輕忽民眾生命之公共安全重要性,該部疏於監 督,顯有疏失。
27
3、再查,營利事業統一發證制度遭廢除後,基於「登 記與管理分離」原則,將其他單位負責之「管理」 工作(包括都計、建管、衛生、消防等查核業務) 與經濟部商業司所掌管之「登記」業務澈底分流, 各項管理由各目的事業主管機關自行稽查或抽 查。此雖有助於提升營利事業開始營運之效率, 惟忽視統一發證與登記制度對於公共安全稽查、 維護行為所具有之指引功能。質言之,公司或商 業完成登記手續後,其實際營業行為及地點已無 法為都市計畫、建築、消防等主管機關掌握,不 符合土地使用分區的小規模營業場所隱匿於住宅 區,形成公安管理上之重大漏洞。該部不察,於 新制上路後,並未依照先前行政院會議結論: 「有關管理問題,依照行政院公共安全方案,各 地方政府均應成立『聯合稽查小組』,對會影響 公共安全的行業加強稽查工作。另配合電子化政 府之推動,未來商業登記、營業登記及相關建 管、都計、消防、衛生等管理檔案,均可上網供 各主管機關查詢,可加強橫向聯繫,以落實管理 工作」等內容,主動協調資料彙整,反而將「營 業場所」列於公司(商業)申請書之自由填載欄 位,並將核准登記函副知地方政府都計、建管、 消防等單位採行相關管理措施。對此,新竹市、 苗栗縣等地方政府曾多次向經濟部反映實地查核 上所面臨之困難,並盼該部妥為處理因應;惟經 濟部對地方政府此等意見均置若罔聞,未加重視 並謀解決之道。 4、對於上開疑義事項,經濟部函復本院稱:「該部 於99年3月11日經商字第09902404380號函請經建 會進行跨部會協調,經建會遂於99年6月2日邀集
28
相關部會及縣市政府研商,並決議建置公司(商 業)登記及財稅登記資料單一窗口查詢介面」云 云。惟其研商將近一年,該查詢介面迄今仍未建 置完備,該部亦未於過渡期間內採取適當措施亡 羊補牢,顯未正視相關問題之嚴重性。 5、綜上,經濟部在相關配套措施未及建立,各目的 事業查核人力不足之情況下,即於98年4月13日 起率爾廢除營利事業統一發證制度,洵難落實「維 護公共安全方案—營利事業管理部分」應辦理商 業管理中有關公共安全事務,致使各地方政府之 都計、建管、衛生、消防等單位疲於奔命,實乃 以鄰為壑,不但忽視政府施政本屬一體之理念, 亦罔顧公共安全之重要性,過程草率、規劃欠 周,核有違失。 (二)經濟部商業司於97年商業登記法修正前後,未能充 分考量其負面效應,甚至造成地方政府管理上之闕 漏,允宜通盤檢討改進: 1、舊商業登記法有關商業不得經營其登記範圍以外 之業務,以及違反上開規定者,得對該商業負責 人處新臺幣一萬元以上三萬元以下罰鍰,並由主 管機關命令停止其經營登記範圍外之業務之規定 於該法97年1月16日修正公布後已遭刪除,考諸 當時修正理由略以,所營業務除許可業務外,其 餘法規非禁止或限制之業務,均得以經營,爰參 考公司法立法體例,便利商業彈性靈活經營,以 適應快速變遷之經濟環境等語。 2、上開商業登記法之修正意旨殆係為因應經濟環境 之瞬息萬變,期能藉由法規範之鬆綁,使商業之 經營得更富彈性,進而促進商業之蓬勃發展與經 濟之繁榮,固誠屬良善;惟此項法規範之變更卻
29
未充分慮及營業類別與建築物安全標準、消防安 全檢查標準間之連動關係,蓋商業營業項目之確 實掌握與管理乃係落實相關建築管理或消防法規 之基礎。而商業主管機關對於商業所從事營業項 目之認定自屬責無旁貸,倘商業主管機關於此鬆 手,而將所營業務交由各法規之權責機關逕為認 定,勢必將囿於相關專業能力之不具備,以及不 同機關間橫向聯繫之欠缺而迭生齟齬,莫衷一 是。爰主管全國商業之經濟部商業司允宜就該次 商業登記法修正後,對於所形成登記之所營業務 與商業實際從事之營業項目不符之問題,以及因 此所衍生之管制面缺失,造成地方政府公共安全 管理之障礙與闕漏,須通盤檢討改進。 通盤檢討改進。 七、本案火災所衍生之法令上疑義,凸顯部分法令欠缺 明確性,致中央與地方之認知解讀歧異,有待通盤 檢討修正: (一)內政部營建署部分: 1、按都市計畫法台灣省施行細則第15條第1項第11 款規定,住宅區內禁止設置之行業為「舞廳 (場)、酒家、酒吧(廊)、特種咖啡茶室、浴室、 妓女戶或其他類似之營業場所」,又依據內政部 營建署訂定之「加強建築物公共安全檢查及取締 執行要點」規定,無論備有服務生陪侍之酒店, 或無陪侍之酒吧,均不得設於住宅區;惟依經濟 部商業司公司行號營業項目分類,「飲酒店業」 之定義為「從事酒精飲料之餐飲服務,但無提供 陪酒員之行業」,係屬「飲食業」項下之子業別, 與酒家、酒吧(廊)係屬「特殊娛樂業」有間。是 關於飲酒店得否設於住宅區內乙節,即由於內政 部營建署與經濟部間認定上之歧異,造成地方主
30
管機關無所適從,形成執法上之嚴重困擾,有關 機關自應將相關法規會商統整,以統一法令之解 釋適用,俾供遵循。 2、依建築技術規則建築設計施工編第88條規定,酒 吧(B-3類組)之天花板、內部牆面或高度超過1.2 公尺之固定隔屏或兼作櫥櫃使用之隔屏,其裝修 材料應為耐燃三級以上,以延緩火勢擴大,並利 於人員逃生避難。惟對於非固著性而係以黏著方 式貼附之泡棉,或壁紙、壁布、窗簾、地氈等黏 貼物品及擺設,則因非屬天花板及牆面材料,現 行法規中未納入相關耐燃或防焰之要求,形成規 範上之漏洞,本案業者所使用隔音泡棉即屬之, 允應檢討修正。 (二)內政部消防署部分: 1、依內政部訂頒之「加強建築物公共安全檢查及取 締執行要點」第6點規定:「消防單位執行消防檢 查時,發現建築物防火避難設施等有不符規定之 公共安全事項,『應』即時通報各目的事業主管 機關及建築主管機關處理,通報內容包括逃生通 道、安全梯、安全門是否堵塞及防火區劃是否破 壞。」;惟內政部消防署為落實消防機關執行消 防法相關規定所訂定之「消防機關辦理消防安全 檢查注意事項」第2點第1項第6目卻規定:「發現 有逃生通道堵塞,安全門、安全梯堵塞及防火區 劃破壞或拆除等違規情事,『得』協助通報(如 附表四)目的事業主管機關處理,並彙整查報清 冊提報地方政府首長主持之公共安全會報或治安 會報處置」。顯見中央消防主管機關對於法令要 求之通報義務均有認識不清之情形,遑論督導各 地方消防機關辦理安全檢查之通報事宜,應予妥
31
善檢討。 八、行政院應立即督促經濟部、內政部於制度面、執行面 所衍生之公共安全疑慮,通盤澈底檢討,並落實督導 各縣市加強公共安全,以維護消費者之權益: (一)按98年4月11日「營利事業統一發證辦法」廢止前之 規定,營利事業之登記應由商業、稅捐、都市計畫 、建築主管單位聯合審查。商業主管機關另得主動 或會同有關單位就轄內營業場所是否有未登記即行 營業或經營登記範圍以外業務等違規情事執行稽查 及裁處。如有違規情節重大者,該營利事業原領登 記證得以直轄市或縣(市)政府名義撤銷之,藉以 發揮遏止非法商業行為之效果。惟查自行政院核定 經濟部函報之營利事業統一發證施行期限至98年4 月12日止起,辦理公司登記或商業登記後,毋庸再 行辦理「營利事業登記」及取得「營利事業登記證 」。自此公司及商業登記所在地不再視為營業場所 ,而為法律關係之準據點(主事務所),原有的登 記、管理聯繫機制也因此脫勾,致使公司或商業完 成登記手續後,其實際營業行為及地點已無法為都 市計畫、建築、消防等主管機關掌握,不符合土地 使用分區的小規模營業場所隱匿於住宅區,形成管 理上之重大漏洞。 (二)另按內政部於100年3月10日至13日之專案督導發現 ,業者於檢查時皆能提具公司或商業登記證明文件 ,卻不知營業場所應洽當地建築主管建築機關辦理 變更使用執照、室內裝修審查等申請手續,且認為 完成公司或商業登記手續,持有納稅證明即表示該 營業場所已合法使用。惟廢除聯合登記作業對業者 而言產生相當大的經營風險,亦造成人民財產投資 容易產生錯誤(誤以為已經合法取得商業登記並開
32
店營業,然事後才被指陳位於農業區、住宅區內等 ,不符合分區使用規定,如果不能期限改善會被斷 水斷電,或質疑政府執法不當,故意陷人民於錯誤 等),被取締之業者反彈傷及政府威信等問題,亦 造成縣市政府執法上之困難,致業者與行政機關間 的爭執不斷。 (三)綜上,有關商業登記部分,行政院應立即督促經濟 部、內政部於制度面、執行面所衍生之公共安全疑 慮,基於政府行政一體之立場以及公共安全優先原 則,通盤加以澈底檢討,並落實督導各縣市政府加 強公共安全,以維護消費者權益。
FD06146 | 2011_台湾_桃园万达爆竹工厂爆炸新北新兴堂香铺爆炸_监察院弹劾案文.pdf
分类:06_境外及港澳台调查报告 | 年份:2011 | 地域:台湾 | 严重程度: | 场所:厂房/车间 | 起火原因:燃气/爆炸 | 来源格式:pdf
1
彈 劾 案 文
壹、被彈劾人姓名、服務機關及職級: 謝景旭 桃園縣政府消防局 局長【比照簡任第13 職等政務官任 用;任職期間:自民國(下同)98 年12 月23 日至100 年1 月1 日桃 園縣政府升格改制準直轄市迄今】。 黃德清 新北市政府消防局 局長【比照簡任第13 職等政務官任 用;任職期間: 95 年10 月16 日至96 年9 月30 日擔任原臺北縣 政府消防局局長、96 年10 月1 日至97 年6 月30 日擔任原臺北縣 政府升格改制準直轄市之消防局副局長兼代理局長、97 年7 月1 日至99 年3 月19 日擔任局長、99 年3 月20 日至99 年12 月24 日擔任原臺北縣政府參事兼代理消防局局長、99 年12 年25 日擔任 新北市政府消防局首任局長迄今】。 貳、案由:桃園縣政府消防局局長謝景旭自轄內萬達爆竹煙 火工廠於100 年4 月1 日爆炸後,明知該廠災後 殘存之爆竹煙火極具危險性,竟怠未依法督促所 屬清點、檢查、封存及扣留,尤率爾指示發函任 令該廠業者限期處理,致其急欲變賣而與新北市 新興堂香舖負責人擅自僱用違法之貨車載運,肇 生該貨車在同年月22 日晚間將部分煙火卸貨於 該香舖時不慎發生爆炸,釀成4 死38 傷之重大災 害。新北市政府消防局局長黃德清怠未盡監督之 責,致所屬無視該香舖曾有超量囤積、販賣,甚 至在拖板車以整排鐵管裝填、施放煙火等違法事 實,且明知其適逢媽祖誕辰期間,民間信仰對爆 竹煙火需求甚殷,竟未加強檢查,毫無取締紀錄, 顯縱容業者長期與桃園萬達爆竹煙火工廠有違法 妄為可趁之機,致該香舖負責人確實因媽祖誕辰 所需,而將該廠部分殘存煙火卸貨於該香舖時不 慎發生爆炸,終釀成前揭重大災害,危害公共安 全及戕害人民生命財產至鉅。經核均顯有重大違 失,人命關天,茲事體大,爰依法提案彈劾。
2
參、違法失職之事實與證據: 經查,100 年4 月1 日上午11 時20 分許,坐落於桃 園縣觀音鄉之萬達煙火製造股份有限公司(下稱萬達公司) 工廠(下稱桃園萬達廠)發生爆炸,造成2 死1 傷之公安事 故。前經本院調查發現,桃園縣政府消防局局長謝景旭在 該廠爆炸前,除未依規定督促所屬落實流向勾稽管制及檢 查作為,自爆炸後,該局亦未經檢查、清點及重新審核, 逕草率認定該廠經廢止製造許可之倉庫及其殘存之爆竹 煙火物品係屬合法,業經本院糾正在案 1【證1,見附件第(下同)1~9 頁】,合先敘明。 嗣桃園萬達廠甫爆未久,時至100 年4 月22 日晚間8 時19 分許,列為新北市政府觀光景點,已有75 年歷史, 坐落於該轄五股區凌雲路14、16、18 號之新興堂香舖(下 稱系爭香舖)旁,滿載10 餘公噸爆竹煙火物品之貨車卸貨 於該香舖時不慎爆炸起火,除造成業者及路過民眾4 死38 傷之外,並殃及附近66 棟房舍全毀或半毀,以及半徑百 餘公尺範圍內之75 部車輛、建物設施、道路、高速公路 隔音牆毀損等重大災害(下稱本案爆炸災害),危害公共安 全至鉅。案經新北市政府暨所屬機關、桃園縣政府、內政 部(訴願審議委員會)、內政部消防署(下稱消防署)及臺灣 板橋地方法院檢察署(下稱板橋地檢署)分別調查、鑑定、 裁處、決定及偵查結果,悉認定釀成系爭香舖爆炸災害之 爆竹煙火產品,係源自桃園萬達廠前揭災後殘存而未經封 存、管制致任意亂竄外流之爆竹煙火物品【證2,12~13 頁、證 2-1,26、36~37、40 頁、證2-2,56~57 頁、證2-3,66~67、75、77 頁、證2-4,97~98 頁、證2-5,108~109、111~113、120~134、138~142、147~156 頁、證3,180 頁、證 3-1,185 頁、證3-2,188 頁、證4,192、203~204 頁、證5,206~209 頁、證6,210~212
1 業經提101年2月7日本院內政及少數民族、財政及經濟委員會第4屆第54次聯席會議審查通過 在案;該調查報告(派查字號:100年4月7日院臺調壹字第1000800126號函)載明略以:桃園縣政 府相關失職人員責任併入本案(派查字號:同年8月22日院臺調壹字第1000800337號函)處理。
3
頁】,足證前揭二起爆炸案之因果關連性與本案被彈劾人等 違失事證之密切牽連性暨重大可歸責 2性,殆無疑義。茲將 被彈劾人等各違法失職之事實與證據分述如下: 一、被彈劾人謝景旭部分: 被彈劾人謝景旭自98 年12 月23 日起,即擔任桃 園縣政府消防局局長迄今【證7,236、239~243 頁】,負有綜 理、督導及指揮所屬依據爆竹煙火管理條例第2 條、第 20 條、第21 條規定【證8,244~252 頁】,針對轄內爆竹煙 火製造、儲存場所,恪盡檢查、流向登記管制及安全 管理之責,惟渠於桃園萬達廠爆炸災害發生前、後,皆 怠忽職責,肇生本案重大災害。其違失之事實與證據如 后: (一)被彈劾人謝景旭於桃園萬達廠災前即怠於監督,致 所屬對爆竹煙火流向勾稽管制與檢查作為之怠忽 及不切實,肇生災後管制、扣留作為失所依據,違 失連連: 經查,桃園萬達廠於爆炸發生前,自99 年10 月至100 年2 月間陳報桃園縣政府消防局之爆竹煙火 原料、半成品、成品(下稱爆竹煙火物品)登記表,據 消防署派員實地查核發現,計多達71 筆與規定不符 事項【證9,263~271、274 頁】,顯見該廠廠內爆竹煙火物 品管理之鬆散,流向不明情事早已存在甚久,期間卻 未見該局查核揭露該等缺失,此有該局自承:「本局 前往清點該廠爆竹煙火之數量共計21 次,結果均符
2 桃園縣政府針對本案相關失職人員之懲處結果如下:被彈劾人謝景旭口頭警告、消防局第三大隊大 隊長申誡2次、觀音分隊長申誡2次並調整職務、責任區隊員申誡2次並改調非責任區、火災預防科科 長、災害搶救科科長各申誡1次、第三大隊副大隊長調整職務。新北市政府針對本案相關失職人員懲 處結果則為:被彈劾人黃德清、消防局危險物品管理科科長各申誡2次、轄區大隊長、中隊長調地服 務。核前揭二府懲處結果,顯與消防專業人員獎懲標準表載明:「……五、有下列情形之一者記過: (一)對違反消防法令案件裁處工作未依規定執行,產生不良影響者。……(三)疏於查處公共危險物品 (含爆竹煙火)或可燃性高壓氣體等,情節較重者。(四)搶救各種災害有明顯疏失,致擴大災害,情節 較重者……。(七)對所屬督導無方或查察不週,致生事故,情節較重者。……(十五)對違法、違規案 件,不依規定處理,尚未構成犯罪者。……六、有下列情形之一者記一大過:(一)對重大災害事件疏 於防備或處理失當,致生不良後果,有虧職守者。……」有違,明顯過輕。
4
合規定」等語【證10,286 頁】在卷可證。足見被彈劾人 謝景旭帄時即怠於監督,肇使所屬對爆竹煙火流向勾 稽管制與檢查作為之怠忽及不切實,坐令該廠恣意妄 為,除於災前未曾對萬達廠就其流向不明情事,處以 罰鍰之外,亦無從掌握該廠庫存爆竹煙火之種類及數 量,尤肇致災後管制、扣留作為失所依據,違失連連, 此觀消防署查復略為:「故凡爆竹煙火製造場所或經 達管制量以上之爆竹煙火儲存場所,均應依規定辦 理,基此,該局亦應本於權責落實清查。本署經查核 該局100 年5 月9 日函報之爆竹煙火成品倉庫清點資 料……顯見該局於發生事故之前,並未依規定落實檢 查,故無法有效掌握該廠爆竹煙火之數量。」【同證9, 276 頁】及被彈劾人謝景旭及該局鄭副局長於本院約詢 時分別自承:「有可能業者不符規定,或同仁未落實 查察所致」、「有可能是本局同仁之前未落實查核所 致。」等語【證11,304、312 頁】,益資印證。 (二)被彈劾人謝景旭自桃園萬達廠爆炸後,明知該災害 之嚴重性及該廠殘存爆竹煙火之危險性,竟怠未依 法督促所屬清點、封存、沒入、扣留及管制,甚至 未經檢查及審查,逕草率認為該廠經廢止製造許可 之倉庫及其殘存之爆竹煙火物品係屬合法,違法失 職之事證,至為明確: 1、查,桃園萬達廠於100 年4 月1 日發生爆炸肇生2 死1 傷之災害,被彈劾人謝景旭既簽請該縣縣長以 該府同年月14 日府消預字第1000110442 號函廢止 該公司「爆竹煙火製造許可證書」,並由渠核准於 同年月18 日公告【證12,343~346 頁】。顯證渠深悉前 揭爆炸災害之嚴重性,始足以認定屬於爆竹煙火管 理條例第6 條第4 項第2 款【同證8,244~252 頁】所稱「重 大公共意外事故」,從而方有廢止該廠製造許可之
5
舉。渠自應積極督促所屬對該廠實施廢證後相關管 制作為。且詢據行政院法規委員會(下稱行政院法 規會)、消防署分別查復與約詢時表示:「爆竹煙火 製造場所內工作場所包括庫儲區在內」、「廢止製 造許可後,其未受波及之倉庫,應依爆竹煙火管理 條例第5 條申請取得建造執照及使用執照後,方得 作為儲存倉庫使用。」、「應該同一個照,撤銷製 造許可後,全廠包括倉庫應都同時廢止。」等語【同 證9,254 頁、證11,294 頁、證13,347~348 頁】,以及被彈劾 人謝景旭既明知「該廠發生火災(爆炸)後,殘存之 爆竹煙火呈現不穩定之狀態,具危險性」,更表 示:「因該廠爆炸事故發生後,爆竹煙火成品、半 成品及原料,受爆炸後恐處於不穩定之狀態,稍有 碰撞、掉落,即有可能發生爆炸意外……造成本府 消防局同仁生命危害。」、「本局於災後知道其有高 度危險性」等語【同證10,282 頁、證11,291、295、303 頁】, 顯見該廠遭廢止製造許可證後,其失效範圍既涵蓋 該廠作業室製造區、儲存倉庫……等斯時申請製造 許可之全廠區域,則該廠未遭爆炸殃及之儲存倉庫 及其殘存之爆竹煙火物品,非經重新檢查、申請許 可及安全認證之前,顯難認屬合法,更難認其安 全。被彈劾人謝景旭既明知其危險性,尤應積極指 揮所屬嚴密管制、封鎖該廠全廠區域,並詳實清點 其殘存爆竹煙火物品之種類及數量,從而除迅即應 依爆竹煙火管理條例第32 條規定【同證8,252 頁】:「違 反本條例規定製造、儲存、解除封存、運出儲存地 點、販賣、施放、持有或陳列之爆竹煙火,其成 品、半成品、原料……不問屬於何人所有,直轄 市、縣(市)主管機關應逕予沒入。」逕予沒入之 外,更得依行政執行法第36 條、第38 條規定:「行
6
政機關為阻止犯罪、危害之發生或避免急迫危險, 而有即時處置之必要時,得為即時強制。即時強制 方法如下:……二、對於物之扣留、使用、處置或 限制其使用……」、「軍器、凶器及其他危險物, 為預防危害之必要,得扣留之」【證14,358 頁】及行 政罰法第36 條、第39 條規定:「得沒入或可為證 據之物,得扣留之……」、「易生危險之扣留物, 得毀棄之。」 【證15,365~366 頁】,確實扣留或毀棄之, 以避免其任意移動、流出而再肇生公共危險,此有 行政院法規會、消防署及新北市政府分別表示: 「經該消防局調查既認其受爆炸後恐有不穩定性, 造成安全上之疑慮,爰如符合行政執行法第36條所 定,行政機關為阻止犯罪、危害之發生或避免急迫 危險,而有即時處置之必要者,尚非不得為即時強 制之必要處置……」、「查萬達公司於發生事故後, 桃園縣政府即應檢查該工廠倉庫位置、構造、設備 及安全管理,有無符合爆竹煙火製造儲存販賣場所 設置及安全管理辦法之規定,如有未符合狀況即應 本權責依違反爆竹煙火管理條例處分」、「爆竹煙 火管理條例於99 年6 月2 日修正後,地方主管機關 已可依第27 條處分新臺幣30 萬至150 萬元罰鍰, 並可依第32 條予以沒入。」、「現場庫存爆竹煙火 產品如有危險性應進行封鎖」、「起碼於災後要立 即進行清點,才是正辦。」、「爆竹煙火管理條例、 行政執行法、行政罰法皆有若干規定……本案萬達 公司經桃園縣政府廢止製造許可後,該府應即衡諸 前揭規定,本諸權責辦理。」、「本案(萬達廠)倘4 月1 日發生事故後,該廠爆竹煙火儲存場所(倉庫) 構造或設備已不符管理辦法規定,當時即可依爆竹 煙火管理條例第27 條及第32 條規定分別處予罰鍰
7
及沒入爆竹煙火。」等語【同證9,275、278頁、證11,293、 333 頁、證13,347 頁、證16,369~370、373 頁】,足資印證。 2、惟查,被彈劾人謝景旭自桃園萬達廠爆炸後,除怠 未依法督促所屬檢查、清點、封存、扣留、沒入該 廠殘存之倉庫及其爆竹煙火物品,此觀消防署分別 表示:「經本署查核該局100 年5 月9 日函報之爆 竹煙火成品倉庫清點資料,發現於第20 號、第24 號……第28號倉庫,均存放有舞臺煙火以外之專業 爆竹煙火,依該局99 年9 月15 日桃消預字第 0990111065 號函,該等倉庫僅供儲存摔炮類以外之 一般爆竹煙火成品使用,並不得存放煙火彈、盆花 等專業爆竹煙火。顯見該局並未依規定落實檢查及 處分。」、「萬達廠有些倉庫只允許儲放一般爆竹 燈火,卻發現夾雜高空專業爆竹煙火,顯見該局就 該廠倉庫儲存物品之管理出現疏漏缺失。」【同證9, 272~273 頁、證11,320 頁】及桃園縣政府消防局主管人 員、被彈劾人謝景旭分別自承:「僅封鎖爆炸後的 作業區……未封鎖倉庫」、「本局於災後知道其有 高度危險性,雖未清點、檢查及處分……」等語【同 證11,293、303 頁】甚明,因而除怠未督促所屬分別依 爆竹煙火管理條例、行政執行法及行政罰法上開相 關規定,予以沒入、扣留、封存等即時強制作為, 明顯違法之外,此觀被彈劾人謝景旭於本院約詢時 提問:「為何未按行政程序法及行政執行法相關規 定辦理?」時,自承:「因為爆炸後的剩餘庫存爆 竹煙火產品恐有危險性,不宜貿然清查、移 動……。」等語【同證11,292 頁】益明,竟未經重新審 查,渠逕草率認定該廠爆炸後經廢止製造許可之倉 庫及其殘存之爆竹煙火係屬合法,此復分別有被彈 劾人謝景旭及該局鄭副局長於本院約詢時分別自承
8
略以:「該廠遭廢止製造許可後之倉庫沒有重新申 請許可,因業者有表達抗議。」、「萬達廠爆炸後 未受波及倉庫內之庫存爆竹煙火具不穩定性而有高 度危險性。本局考量當初該廠既領有製造許可,該 廠儲存倉庫亦應合於規定。」、「本局很單純的認 定該廠既是合法工廠,故之前儲存的物品應該是合 法……」等語【同證11,302、309、311 頁】及該局相關查 復資料【同證7,232 頁、證10,282~283 頁】附卷足憑,被 彈劾人謝景旭怠忽之事證,足堪認定。 (三)被彈劾人謝景旭非但未依法督促所屬對桃園萬達 廠災後之倉庫及其爆竹煙火物品實施管制及封 存,尤率爾指示所屬發函任令業者自行限期處理該 批極具危險性之爆竹煙火物品,肇生該廠急欲變 賣,竟與系爭香舖負責人僱用違法之車輛載運, 肇生其因裝卸部分爆竹煙火物品於系爭香舖時不 慎引爆,釀成本案重大災害: 1、尤有甚者,被彈劾人謝景旭既明知「桃園萬達廠災 後殘存之爆竹煙火極具危險性,貿然移動,即有可 能發生爆炸意外,造成該府消防局同仁生命危害」 【同證10,282 頁、證11,291、295、303 頁】等情,除竟未以 同理之心設想民眾之生命財產及公共安全,與該局 同仁生命同樣可貴無價,皆應積極確保,而怠未依 法封存、沒入及扣留之外,反恣意指示【同證7,229 頁、證11,303 頁】所屬以該府100 年4 月21 日府消預 字第1000110516 號函【證17,379~380 頁】囑該廠業者, 任令該廠業者限期於同年月30 日前自行處理該批 災後極具危險性之爆竹煙火物品,因而未指派所屬 從旁警戒、監視,率讓該廠業者擅自移動、處理, 致其急欲變賣而與系爭香舖負責人陳○隆合謀僱 用違法之貨車載運,除肇生該貨車於同年月22 日
9
晚間因裝卸部分爆竹煙火物品於系爭香舖時不慎 引爆,釀成4 死38 傷之重大災害【證2,12~13 頁、證2-1, 26、36~37、40 頁、證2-2,56~57 頁、證2-3,66~67、75、77 頁、證 2-4,97~98頁、證2-5,108~109、111~113、120~134、138~142、147~156 頁、證3,180 頁、證3-1,185 頁、證3-2,188 頁、證4,192、203~204 頁、證5,206~209 頁、證6,210~212 頁】,據此足認被彈劾人 謝景旭前揭怠忽作為及恣意違法指示,顯與系爭香 舖重大災害存有直接因果關係之外,該廠自爆炸後 究竟流出多少殘存爆竹煙火物品四處亂竄,迄今尤 無從掌握其種類及數量,以上分別有桃園縣政府消 防局鄭副局長、被彈劾人謝景旭於本院約詢時分別 自承:「我後來看過,認為該公文的用詞確實有問 題,應再斟酌」、「本局相關作法有檢討改進空間」、 「流向不明,沒辦法查」等語【同證11,304、313 頁】 在卷足稽,更遲至桃園萬達廠爆炸後逾1 個月餘, 迨同年5 月2 日、23 日始分別發現該廠違反相關 安全管理規定及外流情事,從而方對萬達公司處以 罰鍰,此分別觀消防署表示略以:「查萬達煙火公 司於發生事故後,桃園縣政府即應檢查該工廠倉庫 位置、構造、設備及安全管理,有無符合規定…… 桃園縣政府於5 月23 日針對違反上開安全管理部 分開具裁處書,處萬達煙火公司新臺幣30 萬元罰 鍰。」、「萬達廠撤銷許可後,相關倉庫理應重新 申請許可、認定後,才可以容許儲存爆竹煙火,桃 園縣政府消防局卻於5 月2 日(系爭香舖爆炸後逾10 日) 始發現該儲存倉庫不符合規定」等語【同證9,275 頁, 證11,291 頁】及桃園縣政府裁處書【同證3,180~183 頁】 足堪印證。 2、復據被彈劾人謝景旭於本院約詢時指稱:「這部分 由同仁執行,因我沒去看,我並不暸解……。」、
10
「清查時沒有去,但至五股爆炸後去過2 次」等語 【同證11,301~302 頁】,顯見自萬達廠於100 年4 月1 日爆炸後,渠竟對該廠殘存爆竹煙火種類、數量毫 未掌握之外,尤迨系爭香舖於同年4 月22 日爆炸 後始親赴該廠查看等消極被動之舉,以及渠自系爭 香舖爆炸後驚覺事態之嚴重性,始派員對桃園萬達 廠實施清查、封鎖、沒入、扣留(同年5 月1 日)、銷毀 (同年5 月4 至31 日)等情【同證7,229~231、233~234 頁】,除突 顯渠於本院調查過程多次辯稱該局於該廠災後未 即清點、檢查之理由,顯前後矛盾,悉屬卸責之詞 外,尤證自該廠爆炸後迄系爭香舖爆炸前,渠怠於 督促所屬,肇使該局諸多法律明定之應即辦理事項 皆未執行,顯然應為而不為,致未能遏阻本案原可 避免之人禍,凡此益證被彈劾人謝景旭怠於監督之 事證,昭然若揭。 3、另查,桃園縣政府消防局於系爭香舖爆炸後,既對 桃園萬達廠處以罰鍰【同證3,180~183 頁、同證3-1,184~187 頁、同證3-2,188 頁】,嗣該廠提起訴願,經內政部駁 回確定【同證4,189~205 頁】,以及被彈劾人謝景旭於 本院約詢前所提書面資料、約詢時之說明:「不幸 衍生新北市五股爆炸事故,造成社會觀感不佳,影 響機關形象」、「自五股大爆炸後,本局曾訪談萬 達廠相關人員達八場次,至最後才承認是該廠所流 出造成五股大爆炸」、「造成五股爆炸案的部分爆 竹煙火物品應該是源自於萬達廠流出」【同證7,235 頁、證11,301、304 頁】、被彈劾人黃德清於本院約詢表 示:「本局認為桃園縣消防局於萬達廠爆炸後未確 實做好清點及流向管理工作,致業者隨意流出造成 本案災害,故應負責任。」【同證11,340 頁】及消防 署查復:「有關爆竹煙火工廠檢查與安全管理及專
11
業煙火(如高空煙火)運出儲存地點之取締及處理依法 係屬桃園縣政府(由消防局主辦)之權責……經瞭解本 案有關桃園縣政府消防局督導業者不周部分,相關 人員已予懲處或調職……。」等語【同證9,278 頁】, 除尤資印證被彈劾人謝景旭已認定該廠殘存爆竹 煙火亂竄外流而釀災之事實,更突顯渠於災後怠於 督促所屬封存與管制而釀災之違失事證,更臻明 確。 二、被彈劾人黃德清部分: 被彈劾人黃德清自95 年10 月16 日,即分別擔 任、兼任或代理原臺北縣政府及新北市政府消防局局 長迄今【同證2-1,41 頁、證2-3,78 頁】,負有綜理、督導及 指揮所屬,落實爆竹煙火管理條例第2 條、第21 條【同 證8,244~252 頁】、消防署分別發布之「爆竹煙火製造儲 存販賣場所違反爆竹煙火管理條例取締作業規範」【證 18,381~384 頁】、「加強爆竹煙火場所安全檢查督導計 畫」【證18-1,385~390 頁】、「消防機關辦理消防安全檢查 注意事項」【證18-2,391~395 頁】及該局「加強爆竹煙火場 所執行檢查宣導勤務督導計畫」【證18-3,396~400 頁】等相 關規定之責,除應每半年至少派員針對轄內香舖、貨 櫃(屋)、隱僻地點……等各類相關場所全面、逐一清查 乙次,據以篩選出可疑處所,從而確實不定期追蹤列 管檢查之外,尤以民間信仰肇生爆竹煙火需求甚殷期 間,與宗教慶典業務有關之香舖自應列為加強檢查重 點,且就該轄擁有冠居全國各縣市首位之1,632 處可 疑處所及未達管制量之販賣處所【同證2-2,52 頁】,比 例高達21%,以及轄區幅員遼闊易成地下爆竹業藏匿 環境等特性以觀,尤應積極督促所屬及時適地增加清 查及檢查頻率,以確保公共安全。然被彈劾人黃德清
12
於本案爆炸災害前,竟未督促所屬加強檢查、取締系 爭香舖及轄內可疑場所,毫無取締紀錄,顯縱容系爭 香舖負責人陳○隆(已歿)長期與桃園萬達廠有違法妄 為可趁之機,終釀成本案重大災害。其違失之事實與 證據如次: (一)系爭香舖係作為桃園萬達廠災後殘存的部分爆竹 煙火物品之儲存場所,乃板橋地檢署偵查結果與新 北市政府消防局調查鑑定所認定之事實,事證至為 明確: 據板橋地檢署100 年度偵字第11265 號起訴書 內容略以:「陳○隆、盧○熹(貨車司機,已歿,下同)於同 年4 月22 日晚上8 時15 分許駕駛車號JQ7○○, 15 公噸營業大貨車抵達系爭香舖後,為將部分煙 火存放於系爭香舖而開始卸貨時,因摩擦、震動 等因素而不慎引燃煙火……。」【同證6,210~226 頁】、 該府消防局火災原因調查鑑定書(檔案編號:H11D22U1)載 明略以:「現場目擊證人周○潔談話筆錄供稱:我 開車經過五股區疏洪北路時……眼角餘光發現路 旁停靠車輛有人有疑似搬貨的動作,後來發現該 車後側有火光冒出……」、「本案火災發生前,盧 ○熹與陳○隆等2 人正於五股區凌雲路一段16 號 (系爭香舖)裝卸爆竹煙火之作業情形……研判案 發當時於起火處所裝卸爆竹煙火等工作……。」【同 證2-4,86~87、97、106 頁】在在足證系爭香舖係作為桃園 萬達廠災後殘存的部分爆竹煙火物品之儲存場所, 乃板橋地檢署偵查結果與新北市政府消防局調查鑑 定所認定之事實,事證至為明確。 (二)系爭香舖帄時即存有超量 3囤積、搬運、裝卸、販賣,
3 按爆竹煙火管理條例施行細則第4條規定:本條例第4條第1項所定爆竹煙火儲存、販賣場所之管制 量如下:一、舞臺煙火以外之專業爆竹煙火:總重量0.5公斤……。
13
甚至在拖板車以整排鐵管裝填、施放煙火等既違法 又危害公共安全甚鉅情事,附近民眾極易察覺,負 有檢查、取締職責之新北市政府消防局於本案爆炸 前,竟未曾有取締紀錄,猶諉為不知,顯長期縱容 該香舖業者肆無忌憚而違法妄為,被彈劾人黃德清 怠於監督之事證,至為灼然: 1、據新北市政府查復資料【同證2、證2-1、證2-2,10~78 頁】、該府消防局火災原因調查鑑定書【同證2-4,79~106 頁】、相關當事人【證19,401~409 頁】及鄰居訪談或談 話筆錄【證19-1,410~413 頁】分別載明略以:「邱○炯 及邱○鼎(陳○隆之父及弟,下同)等均表示系爭香舖平時 時 有販賣爆竹煙火之情形,惟均為負責人陳○隆在管 理……」、「據邱○炯談話筆錄供稱:……營業登 記之負責人是我大兒子陳○隆……香舖經營約六、 七十年了……我不知道香舖倉庫內囤放大量的大型 煙火彈藥是何人囤放……」、「系爭香舖3 樓爆炸 後現場發現少量連珠炮等一般爆竹殘屑……邱○ 鼎查證所稱,系爭香舖之連珠炮等一般爆竹總量為 1 至2 箱,置放於邱○炯3 樓房內角落……。」、 「……邱○鼎答:在家裡(系爭香舖)幫忙,工作是做 香及管理1、2 樓倉庫……14、16、18 號1 樓部分 是打通的……14 號1 樓是倉庫……14 號2 樓是做香 的工廠及倉庫……14 號有3 層樓的貨梯……16、18 號3樓是屋頂平臺、倉庫及臥室…… 臺、倉庫及臥室……3樓倉庫大概3 坪,內有放置連珠炮、蜂炮……香舖本來就有販賣 一般爆竹煙火,所以倉庫有放置一般爆竹煙 火……我哥哥約從1 年前開始接觸高空煙火事 業… … 常被桃園萬達公司叫去做工賺取工 資……」、「鄰居除有去買過一般鞭炮,並看過系 爭香舖負責人於該香舖附近草地、堤防及高架橋
14
下施放高空煙火,亦曾經看過在拖板車上有整排 鐵管在裝填煙火……」及被彈劾人黃德清於本院約 詢自承:「當然是無法完全排除新興堂香舖儲放有 專業爆竹煙火。」、「從相關跡證及現場存活人員 研判,研判萬達廠流出的都是專業煙火」等語【同證 11,339、341 頁】。由上就系爭香舖各樓層皆有大面積 空間作倉庫甚至工廠使用,以及該香舖負責人大 量承接施放國內各地大型高空煙火活動頻仍等各 種跡證觀之,且屬於新北市轄內599 家香舖,極 少數(8 家)擁有貨梯的香舖之一【同證2-3,76 頁】,僅 占1.3%,足證系爭香舖平 時即存有大量搬運、裝 時即存有大量搬運、裝 卸、販賣,甚至在拖板車以整排鐵管裝填、施放 煙火及超量囤積專業爆竹煙火之違法情事,附近 民眾極易察覺,遑論負有檢查、取締職責之責任 區消防隊員,益證新北市政府消防局平時縱容該香 時縱容該香 舖違法妄為,被彈劾人黃德清怠於監督之事證,彰 彰甚明。 2、針對上情,新北市政府消防局於本案爆炸災害前 既早已知悉甚詳,此觀該局早自93 年底起即將系 爭香舖列為「傳統可能販賣爆竹之可疑處所」、「未 達管制量販賣場所」、「爆竹流向調查場所」及「危 險物品場所」甚明,以上並有該局查復書【同證2,19 頁】、99 年8 月9 日17 時、9 月15 日17 時五股分 隊工作紀錄簿【證20,414~415 頁】及本案火災搶救報告 書【證21,416~417 頁】分別載明:「本府消防局基於經 驗法則將香舖業列為傳統可能販賣爆竹之『可疑處 所』,自93 年底起即主動登門訪查,以取締違法 及宣導法令為主要目的……」、「勤務項目:消防 查察、案類:9~17、紀事:爆竹流向調查:凌雲 路1 段18 號場所名稱:新興堂,業者表示:6 月
15
份幫伍萬代訂,已送至土城聖德宮施放,現場無 超量爆竹……。」、「勤務項目:中秋爆竹查察勤 務、案類:9~17、紀事:於上述時間至轄內場所 查察……二、未達管制量販賣場所:……14、系 爭香舖、處理情形:未發現超量或未附加認可」、 「貳、現場概要:……四、建築物消防安全設備 設置情形:該場所1 樓為販賣金紙之零售業,有 放置滅火器,面積未達優先列管條件,但列管為 危險物品場所……。」附卷足稽,被彈劾人黃德清 自應依渠函頒之「加強爆竹煙火場所執行檢查宣導 勤務督導計畫」【同證18-3,396~400 頁】,切實督促該 局各層級主管落實督導作為。詎被彈劾人黃德清 怠於監督,致所屬未確實追蹤列管系爭香舖,竟 未曾有取締紀錄【同證2,19 頁、證2-1,28 頁】,因而無 以藉勤查重罰杜絕系爭香舖業者僥倖心態,猶諉 稱:「本案爆炸發生前計隨機訪查系爭香舖12 次,皆未發現販賣及儲存爆竹煙火情事」、「本局 五股分隊柯、陳二隊員表示,不知道其(系爭香舖 負責人)有從事爆竹煙火買賣情形。」云云【同證2, 19、24 頁】,顯與該局五股分隊上揭工作紀錄簿載明 內容【同證20,414~415 頁】有悖,除涉有隱匿事實及欺 瞞本院之嫌,尤縱容系爭香舖業者有違法可趁之 機,肆無忌憚而違法妄為,被彈劾人黃德清怠忽 職責,洵堪認定。況就系爭香舖平時藉貨梯裝 時藉貨梯裝 卸,爆竹煙火物品顯進出頻繁,以及藉拖板車裝 填高空煙火之作業人力與施放時之震憾聲光效果 觀之,負有列管、檢查、取締職責之責任區消防 隊員豈能諉為不知,益證被彈劾人黃德清及其所 屬迄猶辯稱不知情【同證2、證2-1、證2-2,10~78 頁、證11, 327~342 頁】等語,悉屬推諉卸責之詞,委無可採。
16
(三)新北市政府消防局既明知系爭香舖曾有販賣爆竹 煙火甚至超量儲存情事,惟12 次之訪查竟皆僅在 店舖門市虛晃一招,怠未依規定會同相關人員至倉 庫查看,消極怠忽之舉甚明;且系爭香舖於爆炸後 已拆除,竟仍有檢查結果,尤登載符合規定,該局 檢查勤務之草率,莫此為甚,被彈劾人黃德清怠於 監督之事證,昭然若揭: 1、按爆竹煙火管理條例第21 條規定:「直轄市、縣(市) 主管機關……對於非法製造、儲存或販賣爆竹煙火 之場所,有具體事實足認為有危害公共安全之虞 者,直轄市、縣(市)主管機關得派員進入執行檢查 或取締。直轄市、縣(市)主管機關執行第一項及前 項所定檢查及取締,必要時,得商請轄區內警察機 關協助之。……」【同證8,249 頁】及內政部發布之爆 竹煙火製造儲存販賣場所違反爆竹煙火管理條例 取締作業規範【同證18,381~384 頁】載明:「肆、取締 流程:……二、違法爆竹煙火儲存或販賣場所案 件:……(一)前置作業:……3.必要時,得商請轄 內警察機關協助檢查及取締。……(二)現場進 入:……2.現場進入或遇門窗緊閉,必要時協調警 察機關請檢察官向法院聲請搜索票後進入檢 查。……」是前開法律既定有明文,消防署並訂有 作業規範,被彈劾人黃德清自應督促所屬恪盡地方 消防主管機關職責,派員切實會同警方清查、檢 查、取締轄內爆竹煙火儲存、販賣場所及其可疑非 法場所,以確保公共安全,特先敘明。 2、被彈劾人黃德清雖於本院約詢所提書面資料【同證 2-1,48、59 頁】表示:「本局多次訪查,訪查人員現 場曾要求入內查看,惟遭拒絕,一位年約50 幾歲 婦人稱1 樓屋內及樓上皆作為自家住宅使用……」
17
云云。然該局既明知系爭香舖曾有販賣爆竹煙火甚 至超量儲存情事,允應主動要求查看其儲存場所, 惟該局12 次之訪查竟皆僅在店舖門市停留,怠未 曾至倉庫查看,消極怠忽之舉甚明,顯與該局所 稱:「爆竹煙火販賣業者係以隨機、主動、機動之 取締方式」【同證2,20~21 頁】有悖,肇致被彈劾人黃 德清迨本案爆炸發生後,仍對該香舖1、2、3 樓層 分別有大部分空間作為倉庫甚至工廠使用等情避 重就輕,諉為不知,在本院調查期間,猶多次稱係 住家,此有該局多次查復資料【同證2、證2-1、證2-2、 證2-3,10~77 頁】及本院約詢筆錄【同證11,327~342 頁】在 卷可稽,該局檢查勤務之草率,莫此為甚,渠案發 後猶未深切檢討自省之態度尤屬可議。 3、縱系爭香舖人員拒絕該局人員進入,惟基於消防專 業人員之專業及敏感性,該局更應善盡主管機關職 責,迅即依據上揭法律相關規定【同證8,244~252 頁】、 消防署發布之上開取締作業規範及執行計畫【同證 18、證18-1、證18-2,381~397 頁】,會同村(里)長及警方 設法協請屋主進入,豈能僅憑系爭香舖人員片面之 詞而率信其言,竟未曾依規定設法會同相關人員進 入於先,亦未有向上反應,據實填寫於工作紀錄 簿……等相關因應舉措於後,此觀該局督察室於 100 年4 月27 日針對責任區五股消防分隊隊員柯 ○堃及陳○揚所為之「關懷(陳情)案件訪談筆錄」 載明:「因在場人員表示樓上部分屬於住家,拒絕 檢查。但返隊後就沒有向幹部反映及登載於檢查紀 錄表及工作紀錄簿內……」等語【證22,418~421 頁】甚 明,益證該局消防檢查勤務之虛應故事及敷衍草 率,違失事證至為明顯,被彈劾人黃德清怠於監 督,昭然若揭。
18
4、尤有可議者,系爭香舖爆炸災害發生後,既已於 100 年4 月24 日完成拆除,然該局檢附之「100 年 未達管制量儲存或販賣場所訪查及宣導清冊(五股區 部分)」【證23,422 頁】,系爭香舖於同年5 月8 日竟 仍有檢查結果,尤登載符合規定,在在突顯該局檢 查勤務之敷衍與草率,不無有事後偽造檢查結果之 嫌,被彈劾人黃德清怠於監督,自不可逭。 (四)被彈劾人黃德清明知100 年4 月間適逢媽祖誕辰期 間,爆竹煙火需求甚殷,竟怠未督促所屬依規定加 強檢查系爭香舖及全面清查轄內可疑之貨櫃,致該 香舖負責人確實因媽祖誕辰所需,而向桃園萬達廠 調貨儲放於該香舖時不慎釀成本案重大災害;復於 系爭香舖爆炸前,竟未察覺該香舖負責人另在轄內 泰山地區早已租用貨櫃違法儲存大量極具危險性 之專業爆竹煙火,怠忽職責之事證,洵堪認定: 1、查,本案爆炸災害發生後,檢警單位除循線於100 年4 月25 日查獲系爭香舖負責人陳○隆於系爭香 舖爆炸前,在新北市泰山區,早自99 年11 月10 日起,即已租用「楓○工程股份有限公司」所有之 貨櫃倉,違法儲存總重量達1,398.1 公斤之專業爆 竹煙火外,並自100 年4 月24 日至5 月3 日相繼 於該轄泰山、蘆洲、三重、三峽……等地區香舖及 貨櫃舉發13 件違法儲存爆竹煙火情事,總重量達 5,502 公斤之爆竹煙火物品【同證2,13 頁、證2-1,38~39 頁】,其中不乏藏身人口密集地區,足見該轄爆竹 煙火違法儲存情事之普遍與氾濫,確屬公共安全之 隱憂,惟被彈劾人黃德清於本案爆炸災害前,竟疏 於監督,致所屬各轄區分隊怠未依規定全面清查, 毫未察覺,因而未曾將該等地點列為可疑場所。 2、況被彈劾人黃德清明知100 年4 月間適逢媽祖誕辰
19
慶典期間【同證18-3,396 頁、證24,422 頁】,該局「加強 爆竹煙火場所執行檢查宣導勤務督導計畫」既載 明:「得因應特殊年節慶典增加檢查頻率」、「檢 查頻率:於媽祖誕辰日前後全面訪查」【同證18-3, 398~400 頁】,並以該局同年4 月8 日北消危字第 1000021691 號函【同證24,422 頁】請所屬加強檢查轄 內可疑非法爆竹煙火場所,卻未依渠函頒之計畫確 實督促該局各級主管於前揭因民間信仰肇生之爆 竹煙火需求甚殷期間,落實該計畫明載:「重點期 間易生非法儲存販賣大量爆竹煙火等情事,針對列 管爆竹煙火相關場所督導是否落實檢查及宣導工 作」【證18-3,399 頁】等督導作為,肇致所屬五股分 隊怠未於本案爆炸發生前暨前述期間,全面訪查及 加強檢查系爭香舖,遑論增加檢查頻率,因而未能 及時遏阻該香舖負責人確實因應媽祖誕辰所需,而 向桃園萬達廠調貨儲放於該香舖,此有被彈劾人黃 德清於本院約詢所提書面資料自承略以:「檢察官 認定事實為本次運送既為規避即將遭遇之萬達公 司銷毀損失……則系爭香舖……係陳○隆考量媽 祖生(節慶)順道夾帶之一般且少量之爆竹」【同證 2-3,67 頁】等語,及該局於本院調查迄今無法提供斯 時相關主管人員督導紀錄,足資印證。肇致系爭香 舖負責人為將部分煙火存放於該香舖而開始卸貨 時,不慎引爆,釀成本案重大災害,據此在在足證 被彈劾人黃德清怠於督促所屬確實檢查系爭香 舖,致使該香舖負責人長期與桃園萬達廠有違法妄 為可趁之機,洵對系爭香舖爆炸災害明顯存有重大 可歸責性,違失事證,已堪認定。 3、又,上述14 起違法囤積爆竹煙火之香舖及貨櫃(屋) 等所在地區,復未見被彈劾人黃德清督促該局所屬
20
分隊及時增加清查及檢查頻率,此分別有該局檢附 之相關分隊工作紀錄、可疑場所列管清冊附卷足 憑,突顯該局爆竹煙火檢查勤務之消極與怠慢,被 彈劾人黃德清綜理、指揮及監督不力,至為明確。 另查,苗栗縣通霄鎮巨豐爆竹煙火工廠於92 年11 月16 日發生爆炸釀成6 人死亡、13 人輕重傷之重 大災害,被彈劾人黃德清時任轄區苗栗縣消防局局 長,既遭本院糾正在案,深悉該廠爆炸係肇因於貨 櫃違法儲放爆竹煙火原料不當而受潮引爆【同證2-2, 50 頁、證11,331~332、337 頁】,自應嚴格杜絕貨櫃儲放 爆竹煙火等行為,從而自接任新北市政府消防局局 長後,更應切實督促所屬全面清查轄區任何可疑之 貨櫃。然據上可知,該局遲至災後始察覺該香舖負 責人於爆炸前,在轄內泰山地區早已租用貨櫃違法 儲存大量極具危險性之專業爆竹煙火,洵未依上開 法律、消防署及該局計畫相關規定,切實全面清查 轄內各種可疑場所,渠因循怠忽及疏於督導、指揮 之事證,至為明顯。
21
肆、彈劾理由及適用之法律條文【摘要如后附記事項】: 一、被彈劾人謝景旭部分: (一)按消防局局長負責綜理局務,並指揮、監督所屬 員工,桃園縣政府消防局組織規程【證25,424~426 頁】 第2 條規定甚明。經核,被彈劾人謝景旭於本案爆 炸災害發生前,既長期擔任地方消防主管機關之首 長及重要主管職務【證7,236、239~243 頁】,自應有充裕 時間洞悉爆竹煙火工廠安全管理業務及法令之規 定,從而基於消防局係以防災、救災,確保公共安 全之首要設置目的,戮力督促所屬切實執行爆竹煙 火工廠及其災後安全管理業務,以維護民眾免於恐 懼之自由,合先敘明。 (二)然查,被彈劾人謝景旭非但未能秉於專業及實務經 驗,明知轄內萬達爆竹煙火工廠災後殘存之爆竹煙 火極具危險性,不宜貿然移動,竟怠未依法督促所屬 管制、封存、扣留與確實封鎖,除未經清點、檢查及 重新審核,即草率認為該廠經廢止製造許可之倉庫 及其殘存之爆竹煙火物品係屬合法外,尤率爾指示 發函任令該廠業者限期擅自處理該批極具危險性之 爆竹煙火,因而未派員從旁警戒與監視,肇致萬達廠 因渠指示限期該廠處理之公文,為免該廠殘存之爆竹 煙火遭沒入銷毀而急欲變賣,竟與系爭香舖負責人僱 用違法之車輛載運,肇生其將部分爆竹煙火卸貨於系 爭香舖時不慎引爆,釀成本案4 死38 傷之重大公安 事故,迄今尤無從掌握其流出之種類及數量,足資認 定被彈劾人謝景旭怠於監督及前揭恣意指示,顯與系 爭香舖重大爆炸災害存有直接因果關係,洵有重大違 失。此復觀渠於本院所提書面資料與渠暨相關主管人 員於本院約詢時坦承:「縣長認為相關管理措施應該 要強化,因此本人被縣長口頭警告。」、「本局過於
22
信賴業者,主動積極程度不足,無法滿足社會觀感」、 「本人既身為消防局局長,對於本案造成社會觀感不 佳,理應概括承受全部責任」、「由於本人係綜理消 防局全局各項局務,發生上述爆炸案,深感遺憾與不 安,更理當勇於負責,故本人坦然面對,相關責任絕 不逃避。」等語【同證7,235 頁、證11,289~315 頁】,益資 印證渠應被本院彈劾移送懲戒理由,至為充分,尤臻 明確。 (三)針對前揭重大違失,被彈劾人謝景旭雖藉詞諉稱本案 爆炸災害應由業者負最大責任【同證7,235 頁、證10,288 頁、證11,289~315 頁】云云,然渠於萬達廠爆炸災前與 災後倘積極督促所屬依法切實管理、檢查、封存與管 制,該廠殘存之專業爆竹煙火豈有流出肇生本案爆炸 災害之機會,顯應為而不為,反恣意指示,釀成本案 重大災害,迄猶未切實檢討並據實說明,悉無可採, 推諉塞責且嚴重怠忽職責,足堪認定,洵有重大違 失,核其所為顯已違反公務員服務法第1 條、第5 條 及第7 條等規定。 二、被彈劾人黃德清部分: (一)按消防局局長負責綜理局務,並指揮、監督所屬員 工,新北市政府消防局組織規程【證26,427~429 頁】第2 條定有明文。經核,被彈劾人黃德清於本案爆炸災 害發生前,既長期擔任地方消防主管機關之首長, 且歷任中央及地方消防主管機關重要主管及行政管 理職務【同證2-1,41 頁、證2-3,78 頁】,相關消防專業及管 理、領導統御經驗堪稱完備,自應對爆竹煙火儲存、 販賣場所與其非法可疑場所之檢查、取締相關業務 及法令之規定,瞭然於胸,從而積極督促所屬切實執 行防災檢查勤務,以確保公共安全,先予敘明。
23
(二)惟查,被彈劾人黃德清非但未能本於專業及苗栗縣 巨豐爆竹煙火工廠慘痛釀災遭本院糾正經驗,積極 督促所屬,致所屬無視系爭香舖曾有超量囤積、運 送、裝卸、施放、販賣,甚至在拖板車以整排鐵管 裝填、施放煙火等違法事實,怠未依規定切實追蹤 及加強檢查,12 次之訪查竟皆僅在店舖門市虛晃一 招,未曾至倉庫查看,且系爭香舖於爆炸後已拆 除,竟登載檢查符合規定,檢查勤務之敷衍與草率, 莫此為甚,且毫無取締紀錄,顯長期縱容業者與桃 園萬達廠有違法妄為可趁之機,迨災後始被動察覺 該香舖早已設置倉庫、工廠、貨梯等顯而易作為大 量囤積爆竹煙火之徵兆。渠復明知宗教活動期間對 爆竹煙火需求甚殷,竟未依渠函頒之計畫確實督促 該局各級主管於前述期間落實督導作為,毫無督導 紀錄,肇致所屬五股分隊除怠未於本案爆炸發生前 暨前述期間,全面訪查、加強檢查、取締系爭香舖 及清查轄內貨櫃等可疑場所,因而未能及時遏阻該 香舖負責人因媽祖誕辰所需,而向桃園萬達廠調度 部分殘存爆竹煙火物品,並在轄內泰山地區早已租 用貨櫃違法儲存大量極具危險性之專業爆竹煙火, 終肇致系爭香舖負責人為將部分煙火存放於系爭香 舖而開始卸貨時,不慎引爆,釀成本案4 死38 傷之 重大災害。凡此胥證被彈劾人黃德清怠於督促所屬 確實檢查系爭香舖,致使該香舖負責人長期與桃園 萬達廠有違法妄為可趁之機,顯與系爭香舖爆炸災 害明顯存有因果關係,洵有重大違失。此觀渠於本 院所提書面資料與渠暨相關主管人員於本院約詢時 坦承:「本件事故造成的損害及社會的觀感不佳,本 府負有情資掌握不全之責。」、「執行訪查惟不夠確 實,致無法有效掌握情資、循線追查,應負查察不確
24
實之責任」、「訪查技巧不佳應以檢討」、「勤務執 行單位對系爭香舖訪查不夠確實,致無法有效掌握情 資、循線追查」、「本人及各級主管亦難辭監督之責」 【同證2-3,77 頁、證11,327~342 頁】及消防署表示略以:「新 北市政府消防局有情資掌握不全、督導不周之疏失, 應負行政責任……」等語【同證9,278 頁】,更資印證渠 應被本院彈劾移送懲戒理由,要無疑義。 (三)針對上開重大違失,渠雖飾詞佯稱本案爆炸災害應 由業者及桃園縣政府消防局負最大責任【同證2-1,40 頁、 證2-2,55~57 頁、證11,327~342 頁】云云,然渠倘帄時積極 督促所屬切實追蹤列管系爭香舖及其負責人,豈有 對上揭顯而易見之諸多違法徵兆及先機毫未察覺及 掌握之理,因而肇使業者有一再違法可趁之機,顯 應為而怠為,錯失遏阻災害,保護民眾倖免於難之 先機,洵已悖離政府設置消防機關應積極預防災害 及維護公共安全,以確保民眾免於恐懼之自由等宗 旨。核渠迄猶未據實說明,委無可採,推諉卸責且 嚴重怠忽職守,已堪認定,洵有重大違失,顯已違 反公務員服務法第1 條、第5 條及第7 條等規定。
25
綜上論結,桃園縣政府消防局局長謝景旭及新北市 政府消防局局長黃德清,悉未盡綜理、指揮及監督職責, 嚴重怠忽職守,肇致新北市五股區新興堂香舖於100 年4 月22 日爆炸釀成4 死38 傷之重大傷亡慘劇,戕害人民生 命財產安全並斲傷政府形象至鉅,人命關天,茲事體大, 且違失事證明確,核與公務員服務法第1 條、第5 條及第 7 條所定,公務員應「依法律命令所定執行其職務」、「謹 慎勤勉」及「執行職務應力求切實」等規定有違,並有公 務員懲戒法第2 條之應受懲戒事由,爰依憲法第97 條第2 項及監察法第6 條之規定提案彈劾,並移請司法院公務員 懲戒委員會審議,依法從嚴懲戒。
26
彈劾案文 附記事項
27
附記事項1:被彈劾人違反之法令及適用法條摘要 被彈劾人 違 失 當 時 職 務 重大違失事證摘要 彈劾適用 之法條 謝景旭 桃園縣政 府消防局 局長【比照 簡任第13 職 等政務官任 用;任職期 間:自民國 (下同)98 年 12 月23 日至 100 年1 月1 日升格改制 準直轄市後 迄今】 一、渠於桃園萬達廠災前即怠於監督,致所屬對爆竹煙火流向勾 稽管制與檢查作為之怠忽及不切實,肇生災後管制、扣留作 為失所依據,違失連連。 二、渠自桃園萬達廠爆炸後,明知該災害之嚴重性及該廠殘存爆 竹煙火之危險性,竟怠未依爆竹煙火管理條例、行政執行法 及行政罰法相關規定督促所屬清點、檢查、封存、扣留及管 制,尤未經審查,逕草率認為該廠經廢止製造許可之倉庫及 其殘存之爆竹煙火物品係屬合法。 三、 渠既明知桃園萬達廠災後殘存之爆竹煙火極具危險性,貿然 移動,即有可能發生爆炸意外,造成該府消防局同仁生命危 害,竟未以同理心設想民眾之生命財產及公共安全與該局同 仁生命同樣可貴無價,皆應積極確保,而怠未依法封存、沒 入及扣留之外,反恣意指示所屬囑該廠業者,任令該廠業者 限期自行處理該批災後極具危險性之爆竹煙火物品,致其急 欲變賣而與新北市新興堂香舖(下稱系爭香舖)負責人合謀僱用 違法之貨車載運,除肇生該貨車於同年月22 日晚間因裝卸部 分爆竹煙火物品於系爭香舖時不慎引爆,釀成4 死38 傷之重 大災害,據此足認渠前揭怠忽作為及恣意指示,顯與系爭香 舖重大災害存有直接因果關係之外,該廠自爆炸後究竟流出 多少殘存爆竹煙火物品,迄今尤無從掌握其種類及數量。 公務員服務 法第1 條: 「公務員應 遵守誓言, 忠心努力, 依法律命令 所定,執行其 職務。」、第 5 條:「公務 員應誠實清 廉,謹慎勤 勉……」及第 7 條:「公務 員執行職 務,應力求切 實,不得畏難 規避,互相推 諉,或無故稽 延」之規定。 黃德清 新北市政 府消防局 局長【比照簡 任第13 職等政務 官任用;任職期 間: 95 年10 月 16 日至96 年9 月 30 日擔任原臺北 縣政府消防局局 長、96 年10 月1 日至97 年6 月30 日擔任原臺北縣 政府升格改制準 直轄市後之消防 局副局長兼代理 局長、97 年7 月1 日至99 年3 月19 日擔任局長、99 年3 月20 日至99 年12 月24 日擔任 原臺北縣政府參 事兼代理消防局 局長、99 年12 年 25 日擔任新北市 政府消防局首任 局長迄今】 一、系爭香舖係作為桃園萬達廠災後殘存的部分爆竹煙火物品 之儲存場所,乃板橋地檢署偵查結果與新北市政府消防局調 查鑑定所認定之事實,事證至為明確。 二、系爭香舖平時即存有超量囤積、搬運、裝卸,販賣,甚至以拖 時即存有超量囤積、搬運、裝卸,販賣,甚至以拖 板車裝填、施放煙火等既違法又危害公共安全甚鉅情事,附近 民眾極易察覺,負有檢查、取締職責之新北市政府消防局於本 案爆炸前竟未曾有取締紀錄,猶諉為不知,顯長期縱容該香舖 業者肆無忌憚而違法妄為,渠怠於監督之事證,至為灼然。 三、新北市政府消防局既明知系爭香舖曾有販賣爆竹煙火甚至超量 儲存情事,惟12 次之訪查竟皆僅在店舖門市虛晃一招,怠未曾 依規定會同相關人員至倉庫查看,消極怠忽之舉甚明;且系爭香 舖於爆炸後已拆除,竟仍有檢查結果,尤登載符合規定,該局檢 查勤務之草率,莫此為甚,渠怠於監督之事證,昭然若揭。 四、渠明知100 年4 月間適逢媽祖誕辰期間,爆竹煙火需求甚 殷,竟怠未督促所屬依規定加強檢查系爭香舖及全面清查轄 內可疑之貨櫃,致該香舖負責人確實因媽祖誕辰所需,而向 桃園萬達廠調度部分殘存爆竹煙火物品儲放於該香舖時不 慎釀成本案重大災害;復於系爭香舖爆炸前,竟未察覺該香 舖負責人另在轄內泰山地區早已租用貨櫃違法儲存大量極 具危險性之專業爆竹煙火,倘不幸釀災,造成死傷人數難以 想像,渠怠忽職責之事證,洵堪認定。 五、渠既歷經苗栗縣巨豐爆竹煙火工廠因貨櫃違法儲放爆竹煙 火原料而釀災遭本院糾正之慘痛經驗,竟怠於監督,致所屬 未依爆竹煙火管理條例及消防署函頒命令切實清查、檢查貨 櫃等可疑場所。 公務員服務 法第1 條: 「公務員應 遵守誓言, 忠心努力, 依法律命令 所定,執行 其職務。」、 第5 條:「公 務員應誠實 清廉,謹慎 勤勉……」 及第7 條: 「公務員執 行職務,應 力求切實, 不得畏難規 避,互相推 諉,或無故 稽延」之規 定。
28
附記事項2:本院相關彈劾案件移請司法院公務員懲戒委員會議決結果 本院彈劾案由 公懲會懲戒結果 為92 年11 月16 日晚間7 時許,苗栗縣通宵鎮福源里巨豐 煙火製造股份有限公司工廠因貨櫃違法儲放鋁粉不當受潮 引爆,造成6 人死亡、11 人輕重傷,該廠前於82 年11 月 間亦因貨櫃違法儲放發射藥,不明原因致生2 死1 傷之嚴 重災害,其危害公共安全之情節重大,行政院勞工委員會 中區勞動檢查所前所長范振雄、副所長陳金鐘、前組長陳 新福、檢查員鄭文淮,分別負有監督、審核及執行該廠勞 動暨安全衛生檢查之責,竟長期怠忽職守,不思檢討勵精 圖治遏阻災難之發生,肇致該廠十年間由同樣違反規定之 儲存設施再度發生傷亡災害事件,除造成國家社會成本之 慘痛付出,救災耗費大量之人力、物力亦難以計數,更嚴 重影響周邊環境及住戶生命財產安全,渠等違失事證明確 ,情節重大,核其所為均有違反公務員服務法之規定,爰 依法提案彈劾。 鄭文淮降2 級改敘;陳 新福降1 級改敘;范振 雄、陳金鐘各記過2 次 。 苗栗縣消防局局長石德忠、副局長江淼富分別負有監督、 指揮、核定、審核、管理轄內爆竹煙火相關業務之責,除 怠未督促所屬落實執行非法爆竹煙火製造場所之全面清查 作業,且無視本院前已對該轄內92 年11 月16 日發生19 人死傷之爆竹廠爆炸案,提案糾正促其改善之意見,尤對 於內政部消防署於本案地下爆竹廠爆炸前,要求該局加強 查處地下爆竹廠及追蹤可疑爆竹煙火原料流向等重要公文 ,竟未督促所屬積極查處,終再肇生96 年11 月2 日本案 地下爆竹廠爆炸,釀成9 人死傷之重大災害,合計近5 年 該轄區因爆竹廠爆炸致生死傷人數竟達32 人,高居全國各 縣市之首位,經核渠等違失事證明確,情節重大,爰依法 提案彈劾。 石德忠、江淼富各記過 2 次。 臺中市政府都市發展局局長黃崇典、經濟發展局局長朱蕙 蘭、消防局副局長吳青芳(自88 年1 月17 日起至99 年12 月24 日擔任合併前台中市消防局長,自99 年12 月25 日 台中縣、市合併升格為直轄市後,改任台中市消防局副局 長),均明知轄內哈克飲料店(招牌ALA PUB)長期違規營 業,竟未積極督促並妥善處理,肇致於100 年3 月6 日凌 晨發生火災,釀成9 死12 傷之重大傷亡慘劇,經核均有重 大違失,爰依法提案彈劾。 黃崇典降2 級改敘。朱 蕙蘭降1 級改敘。吳青 芳記過2 次。
FD06147 | 2011_港澳台_澳门_雅廉访大马路31号诚信大厦火警_消防局调查结果.md
分类:06_境外及港澳台调查报告 | 年份:2011 | 地域:澳门 | 严重程度: | 场所: | 起火原因:电气 | 来源格式:md
NEWS GOV-MO: 1月19日雅廉訪大馬路31號一宗火警的調查結果 跳至內容 A A A 繁 目錄 民防快訊 搜尋 首頁 新聞 中央與特區 特區政務 區域合作 對外關係 政府服務 法律司法 廉政審計 經濟財政 勞工就業 公共秩序 醫療衛生 民生福利 旅遊文化 教育體育 城規基建 工程房屋 交通能源 環境氣象 科技通訊 新聞傳播 其他 新聞 全部 中央與特區 特區政務 區域合作 對外關係 政府服務 法律司法 廉政審計 經濟財政 勞工就業 公共秩序 醫療衛生 民生福利 旅遊文化 教育體育 城規基建 工程房屋 交通能源 環境氣象 科技通訊 新聞傳播 其他 圖片 新聞圖片 相聚此刻 圖片 全部 新聞圖片 相聚此刻 視頻 圖文包 專題新聞 施政報告 施政特寫 橫琴粵澳深度合作區 「一帶一路」 粵港澳大灣區 一中心,一平台 專題新聞 全部 施政報告 施政特寫 橫琴粵澳深度合作區 「一帶一路」 粵港澳大灣區 一中心,一平台 專題特寫 GOV.MO 政府入口網站 一戶通 部門網站 部門社交媒體目錄
- 更多
傳媒資料 架構職能 新聞法規 服務承諾 刊物狀況 澳門雜誌 澳門年鑑 澳門相簿 採購資訊 澳門概況 登記服務 預約服務 開考通告 意見信箱 聯絡我們 搜尋 新聞顯示模式 首頁 新聞 中央與特區 特區政務 區域合作 對外關係 政府服務 法律司法 廉政審計 經濟財政 勞工就業 公共秩序 醫療衛生 民生福利 旅遊文化 教育體育 城規基建 工程房屋 交通能源 環境氣象 科技通訊 新聞傳播 其他 新聞 全部 中央與特區 特區政務 區域合作 對外關係 政府服務 法律司法 廉政審計 經濟財政 勞工就業 公共秩序 醫療衛生 民生福利 旅遊文化 教育體育 城規基建 工程房屋 交通能源 環境氣象 科技通訊 新聞傳播 其他 圖片 新聞圖片 相聚此刻 圖片 全部 新聞圖片 相聚此刻 視頻 圖文包 專題新聞 施政報告 施政特寫 橫琴粵澳深度合作區 「一帶一路」 粵港澳大灣區 一中心,一平台 專題新聞 全部 施政報告 施政特寫 橫琴粵澳深度合作區 「一帶一路」 粵港澳大灣區 一中心,一平台 專題特寫 GOV.MO 政府入口網站 一戶通 部門網站 部門社交媒體目錄
- 更多
傳媒資料 架構職能 新聞法規 服務承諾 刊物狀況 澳門雜誌 澳門年鑑 澳門相簿 採購資訊 澳門概況 登記服務 預約服務 開考通告 意見信箱 聯絡我們 民防快訊 首頁 新聞 新聞 繁 简 1月19日雅廉訪大馬路31號一宗火警的調查結果 司法警察局 2011-01-31 16:47 未能播放Youtube視頻 2011年1月19日約上午4時34分,本局報案及緊急行動中心接獲治安警察局第三警司處來電通知,稱在雅廉訪大馬路31號誠信大廈地下大門入口處發生一宗懷疑縱火案。 本局人員到場勘查,發現著火點在上述大廈地下大門入口處的總電錶箱位置。事後本局縱火罪案調查科刑偵人員隨即對上述火警大廈所有住戶進行詢問、多次到火警現場收集證據及詢問街坊等多方面途徑進行調查後,再結合火警現場周邊地方被燒之輕重程度對比分析、目擊證人所見是電錶箱首先起火的資料、以及本局刑事技術廳對被燒電箱及相連之電線的檢驗報告指出某些銅線內部出現有異常變色的現象,而且未檢出任何可疑或易燃物質的檢驗報告,根據電力公司工程師對本案所檢走的被燒電錶箱及相連之電線進行專業評估,指出該些電線接駁口曾出現短路現象而引致燃燒的專業意見,同時亦根據到場的消防員的口供及消防局的調查報告,相信火警是由電錶箱的電線接駁口短路引致,同時亦可排除縱火的可能性。 綜上所述,本局認為今次火警是因天氣寒冷而引致大廈各住戶用電超負荷,導致電錶箱短路及著火燃燒,而燃燒物掉落電錶箱下面停泊的電單車而引發大火。雖然本局當初以有可疑的縱火案進行調查,但經過深入調查後查明為一宗火警意外事件。本局會將有關的調查結果及相關的卷宗送交檢察院進行審查及確認。 本局鄭重呼籲,市民因天氣寒冷而使用電器進行取暖時應注意消防安全,遵照消防局的相關指引適當使用電器,同時不應在大廈通道內停泊車輛或擺放雜物,以避免同類不幸事件的發生。 00:00 −00:00 上一則新聞 消委會新歲前夕公佈物價 同一賀年禮物價格差距大 下一則新聞 文化局附屬單位如常開放 多個藝文活動共慶新春 訂閱新聞局 Telegram政府新聞頻道: https://t.me/macaogcs ,即時接收最新消息。 部門聯絡 部門新聞 2026-07-31 10:11 司法警察局持續進行“雷霆2026”行動 預防和打擊犯罪 2026-07-29 20:01 司警局舉辦兩項青年計劃結業暨啟動禮 培育愛國愛澳青年力量 2026-07-29 09:52 司警局持續展開“雷霆2026”行動 預防和打擊博彩相關犯罪 2026-07-28 18:04 司法警察局舉行督察長、一等督察及首席顧問法證高級技術員晉升儀式 2026-07-28 14:41 “2026全民國家安全教育展線上問答遊戲”圓滿結束 熱點新聞 1 2026-07-25 16:53 藥監局和市政署呼籲停止食用一批次嬰兒配方奶粉 2 2026-07-27 20:43 跨部門持續跟進嬰兒配方奶粉驗出鉛含量超標事件 增檢13個奶粉樣本暫未見異常 求診者中沒有發現鉛中毒 3 2026-07-25 18:43 衛生局就涉鉛超標嬰兒配方奶粉事件設綠色通道 為曾食用涉事批次嬰幼兒提供醫學檢查及健康諮詢 4 2026-07-26 13:02 跨部門跟進大阪飛澳門航班乘客滯留廣西南寧事件 5 2026-07-30 18:39 嬰兒配方奶粉監管措施對接國際標準 跨部門全力保障嬰幼兒健康及食品安全 6 2026-07-27 10:52 本澳法定產假日數明起調升至90日 7 2026-07-25 20:30 惡劣天氣下「銀河娛樂集團世界女排聯賽澳門2026 – 總決賽」的賽事安排 8 2026-07-25 11:00 受熱帶氣旋影響可能發佈之警告(更新時間:2026-07-25 11:00) 9 2026-07-26 00:03 「銀河娛樂集團世界女排聯賽澳門2026 - 總決賽」土耳其巴西爭奪冠軍 10 2026-07-26 08:00 受颱風紅霞影響可能發佈之警告(更新時間:2026-07-26 08:00) 訂閱頻道 Facebook Youtube WeChat Telegram Weibo 澳門特別行政區政府新聞局 Facebook 澳門特別行政區政府新聞局 Facebook 澳門特別行政區政府新聞局 官方微信 澳門特別行政區政府新聞局 官方微信 澳門政府資訊 澳門特區發佈 澳門特別行政區政府新聞局 政府新聞頻道 澳門特別行政區政府新聞局 政府新聞頻道 t.me/macaogcs t.me/NCVMacao 抖音 今日头条 Instagram 電子報 RSS 已複製連結 澳門南灣大馬路762-804號中華廣場15樓 info@gcs.gov.mo (853)2833 2886 (853)2835 5426 GOV.MO 澳門雜誌 澳門年鑑 澳門相簿 意見信箱 聯絡我們 私隱聲明 使用條款 下載手機應用程式 澳門政府新聞 APP - App Store 下載 澳門政府新聞 APP - Google Play 下載 澳門政府新聞 APP - APK 下載
FD06148 | 2011_港澳台_香港_立法会_花园街排档火灾后小贩摊档管理及消防安全.pdf
分类:06_境外及港澳台调查报告 | 年份:2011 | 地域:香港 | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
立法會 Legislative Council
立法會CB(2)993/11-12(04)號文件
檔 號:CB2/PL/FE
食物安全及環境衞生事務委員會
立法會秘書處為2012年2月14日會議 擬備的背景資料簡介
小販(固定攤位)管理
目的
.
本文件旨在綜述食物安全及環境衞生事務委員會(下稱 "事務委員會")過往就小販(固定攤位)管理所進行的討論。
背景
2010年12月6日,花園街發生了一場三級火警,焚毀多 個單層鐵皮及木造的小販攤檔。食物及衞生局立即召開一個跨 局及部門的會議,成員包括保安局、食物環境衞生署(下稱"食環 署")、消防處、機電工程署、屋宇署及民政事務總署的代表,討 論採取各項措施,以加強花園街小販認可區的消防安全及管理。
2011年11月30日,一場致命的四級火警在相同的地點發 生,並導致9死34傷。行政長官在同一天公布,他已指示政務司 司司長成立跨部門工作小組,並擔任該工作小組的主席,以確 保及統籌死傷者及其家屬所得到的服務,並研究改善花園街一 帶公眾安全的措施,包括引進"朝行晚拆"的營運模式。
事務委員會的商議工作
花園街於2010年12月6日發生火災後,事務委員會於 2010年12月14日的會議上曾討論管理花園街小販固定攤檔的議 題。事務委員會委員認為,政府當局應實施各項措施,包括以 防火及自行熄滅的框架及材料重建小販攤檔、區內的防火安全 措施,及讓受影響的固定攤檔小販可盡早重新營業而提供的協
2 助。委員認為,政府當局應保留有當地特色的露天市集,並進 行改善工程,以加強其作為本地市民及遊客的購物點的吸引 力,並使它們可與附近的商鋪共存。委員亦促請政府當局改善 花園街小販認可區的設計。
政府當局告知事務委員會,食環署及消防處會與受影響 小販緊密合作,以改善攤檔結構的設計及安全。倘若區議會、 當地社區及市民有共識,當局亦會考慮任何改善露天市集設計 及營運模式的建議。當局會實施多項措施,包括使用防火物料 搭建攤檔、小販攤檔之間預留足夠空間、裝置合法的電力供應 及確保有足夠空間讓消防車輛通過等,以加強安全,並協助固 定攤檔小販可盡早重新營業。食環署會針對違反小販規定加強 巡查及執法。機電工程署會進行非定期性的巡查,以確保有關 電力裝置符合法例,並在發現任何不正常情況時,通知食環署 採取適當的執法行動。
2011年11月30日花園街火災發生後,事務委員會在其 2011年12月13日的會議上再次討論小販固定攤檔管理的議題。 委員批評政府當局在2010年的火警事件後,並無加緊執行已建 議的安全措施。委員獲告知,食環署已即時對花園街小販區及 全香港小販區的違規行為加強執法。在花園街發生的兩次火警 事件,顯示排檔簷篷過大、貨物阻街,或貨物過夜存放在排檔 範圍以外等陋習,在區內發生火災時,或會助長火勢燃燒。政 府當局正研究"朝行晚拆"的安排及其他措施,如小販攤檔的其他 營運模式。
委員察悉,政府當局已建議引入取消小販牌照制度(下 稱"建議制度"),以改善固定小販攤位的管理及防止其發生火 警。就建議制度進行的諮詢工作已展開,並將為期兩個月,至 2012年2月12日完結,以令建議制度可於2012年4月實施。委員 普遍對建議制度深表關注。根據該制度,若有關持牌小販在 3個月內涉及6次違反《公眾衞生及市政條例》(第132章)或其附 屬法例與小販有關的條文及被定罪,其小販牌照可被取消。部 分委員認為該項建議過於苛刻,兼且不能有效減低小販固定攤 檔的火警風險。他們認為政府當局應考慮加重目前的罰則,如 提高罰款額。 8.
政府當局表示,建議制度是當局參照其他行業的現行發 牌規定安排(如終止食肆經營者/街市檔位租戶的牌照/租約及 殯儀館的違例記分制)而制訂。鑒於有部分固定檔位小販屢次接 獲傳票但仍一再肆意違反規例,當局打算引入該制度,以達到 更大的阻嚇作用。在該兩次火警事件後,政府當局曾與相關的
3 區議會進行討論,其間,部分區議會議員表示支持引入取消小 販牌照的制度。政府當局會聽取相關持份者的意見,包括有關 區議會及販商聯會,以制訂適當的制度。 9.
部分委員認為,"留架不留貨"的安排應予考慮。委員察 悉政府當局的意見,即當局並無必要即時推行"朝行晚拆"的安 排。不過,攤檔商販須遵從現有的規例,如在其批准範圍以內 貯存貨物。委員獲告知,政府當局及花園街的攤檔商販已就"留 架不留貨"的安排達成共識。政府當局在改善小販市場的經營環 境方面最迫切的工作,是確保固定小販攤檔不會在晚上無人看 管時成為火警陷阱。食環署採取的執法行動亦會集中於攤檔非 法分租。 10. 由於臨近聖誕節及農曆新年,委員要求政府當局准許花 園街的受影響商販盡快重新營業。政府當局表示,由於相關政 府部門仍在火災現場進行安全檢查,如審查受損的招牌及建築 物結構,花園街的部分地段已經封閉。當局仍未就受影響商販 復業的時間作出決定,但希望封鎖區會盡快開放。檔位經營者 在獲准恢復營業前,須糾正違規情況,以確保經營環境的安全。 11. 委員並要求政府當局考慮就搭建食環署批准的固定攤 檔,向受影響檔位經營者提供財政援助的建議。
立法會質詢及議案
在2011年12月7日的立法會會議上,5項與花園街火災有 關的緊急質詢根據《議事規則》第24(4)條分別由梁美芬議員、 涂謹申議員、黃毓民議員、梁家傑議員及李慧琼議員提出。在 立法會同一個會議上,涂謹申議員根據《議事規則》第16(4)條 動議一項休會待續議案,以就下述事項進行辯論:旺角花園街 大火慘劇及如何改善街道環境及樓宇的防火安全,避免同類事 件發生,保障市民的生命及財產。 最新發展
所有受影響商販已自2011年12月21日獲准進入花園街 小販市場。議員並已要求政務司司長出席內務委員會的會議, 討論政府當局在火災慘劇後的跟進工作。 4
相關文件
立法會網站的相關文件載列於附錄。 立法會秘書處 議會事務部2 2012年2月9日
附錄
小販(固定攤檔)管理的相關文件
會議 會議日期 文件 2010年12月14日 (項目VI)
議程 會議紀要 CB(2)553/10-11(04)
食物安全及 環境衞生事務 委員會
2011年12月13日 (項目V) 議程 CB(2)510/11-12(05) CB(2)510/11-12(06)
2011年1月12日 會議過程正式紀錄 第48 - 50頁 (梁美芬議員就協助花園街 火災災民提出的質詢)
2011年12月7日 會議過程正式紀錄 第7 - 44頁 (根據《議事規則》第24(4) 條就花園街火災提出的5項 緊急質詢)
立法會
2011年12月8日 會議過程正式紀錄 第21 - 54頁 (涂謹申議員根據《議事規 則》第16(4)條就花園街火災 動議一項休會待續議案)
立法會秘書處 議會事務部2 2012年2月9日
FD06149 | 2012_台湾_台南新營北門醫院火災_監察院糾正案文.pdf
分类:06_境外及港澳台调查报告 | 年份:2012 | 地域:台湾 | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
監察院糾正案件結案情形一覽表 103 年7 月
案號 被 糾 正 機 關 改 善 情 形 結案情形 102 財 正 53 設施改善情形: 一、新營醫院已依據消防安全防護計畫訂定該院各區火源管理負 責人,就該責任區定期實施相關安全管理及查檢;另就院內 單位相關物件儲存空間之安全管理措施,除已上鎖管理外, 如屬易燃性則再加設懸吊式滅火器,確保醫院安全。另北門 分院已分別於1 樓復健科治療區、急診室、2 樓總室設置消 防受信總機。 二、衛福部已於102 年醫院評鑑落實有關醫院防火安全管理9 項 評鑑基準之查核,並令未通過該等條文之醫院於2 個月內改 善;經該部複查後,102 年受評醫院均已合格。 三、衛福部於102 年地方衛生機關業務考評作業計畫新增「消防 安全管理及緊急應變計畫」,據以輔導醫院強化火災緊急災 害應變措施及夜間演練。 四、衛福部已將修訂完成之醫院設置標準,於103 年2 月24 日以 衛部醫字第1031660787 號函,請各縣市衛生局將醫療機構設 置標準列為年度督導考核項目,加強有關醫院防火安全管理 規定之實地查核,並將查核結果於次年1 月底前陳報該部。 五、臺南市政府消防已組成查核小組,並至各場所指導演練並提 示適當應變有關之自衛編組訓練整備之指導方法。另查該轄 醫院、護理機構模擬夜間人力,辦理自衛消防編組演練者已 達85%。 財政及經濟、內政 及少數民族委員 會103.07.02 第4 屆第110次聯席會 議決議:糾正案結 案存查。
資料來源:各常設委員會 編製單位:綜合規劃室
FD06150 | 2012_台湾_台南新營北門醫院火災_監察院調查報告.pdf
分类:06_境外及港澳台调查报告 | 年份:2012 | 地域:台湾 | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
1
調 查 報 告
壹、案 由:據報載,前行政院衛生署新營醫院北門分院 於民國(下同)101 年10 月23 日凌晨發生大 火,造成13 人罹難、59 人輕重傷。究事發 原因為何?相關主管機關有無疏失?實有深 入瞭解之必要。 貳、調查意見: 坐落於臺南市北門區中樞里溪底寮56 之3 號屬地上 4 層鋼筋混凝土帄屋頂建築物之前行政院衛生署(已於102 年7 月23 日改制為衛生福利部,下稱前衛生署)新營醫院北門分院(下 稱北門分院),於民國(下同)101 年10 月23 日凌晨3 時 29 分許,在2 樓委外經營之護理之家旁,被充當儲藏室 而堆放床單、衣物等大量易燃物品之閒置產房內東側 處,遭護理之家林姓住院病患以打火機引燃物品致生大 火及濃煙彌漫而釀成13 人死亡、59 人輕重傷,以及財 損達新臺幣(下同)8 百萬元以上,屬國內醫療養護機構 史上最嚴重之火災意外(下稱系爭火災)。經臺灣臺南地 方法院檢察署(下稱臺南地檢署)偵辦後,以101 年度偵 字第14308 號提起公訴移經臺灣臺南地方法院以101 年 度重訴字第28 號判決之主文略以:「林○○(下稱林嫌) 殺人,處死刑,褫奪公權終身……。」。系爭護理之家 負責人等相關人員刑責部分,則業經臺南地檢署另以 102 年度復偵字第8 號緩起訴處分之理由略以:「(一) 核被告王○○、吳○○、羅○○等人所為,係犯刑法第 276 條第2 項之業務過失致人於死罪,係法定本刑為死 刑、無期徒刑或最輕本刑3 年以上有期徒刑以外之 罪……。(三)被告等人盡其最真摯之努力,與13 名死 者家屬,以及所有數十名傷患均完成和解……。」,並 經臺灣高等法院臺南分院檢察署於102 年8 月7 日駁回
2
再議後確定在案。至此,本案相關人員刑責追訴部分均 已偵結,相關公務人員自始皆未被追究刑責,合先敘明。 至本案相關主管機關是否涉有違失暨其行政責任部 分,案經本院分別函詢前衛生署、前衛生署新營醫院、 臺南市政府、內政部消防署(下稱消防署)、內政部警政 署、行政院勞工委員會、臺南地檢署就有關事項詳實說 明併附佐證資料到院。嗣履勘北門分院系爭火災起火 戶、起火處、相關消防設施(備)、逃生路線、避難帄臺 及縱火嫌犯藏匿處,並聽取相關主管人員現場簡報及說 明。復分別約詢北門分院歷任相關分院院長、前衛生署 林副署長、護理及健康照護處鄧處長、醫院管理委員會 李執行長、賴副執行長、新營醫院潘代理院長、蔡前院 長、王前院長、張前院長、林秘書、蔡總務主任、消防 署葉署長、陳副署長、火災預防組吳組長、火災調查組 蕭組長、臺南市政府顏副市長、衛生局林局長、消防局 李局長、工務局吳科長、警察局蔡分局長暨相關機關主 管人員。再分別針對前揭查復疑點,函請前衛生署、新 營醫院補充說明;另審計部亦就系爭火災派員查核,分 別將相關缺失以102 年1 月30 日臺審部三字第 1020000124 號及同年5 月15 日同字第10200OI277 號等 函查報本院,爰併案調查之深入發現,系爭火災雖肇因 人為縱火,然相關主管機關於火災預防、建物管理、人 員配置、緊急應變作為及措施顯有重大違失,致錯失及 時遏阻縱火與其火勢蔓延及減少人員傷亡之先機。茲臚 述調查意見如后: 一、前衛生署及該署新營醫院怠於監督管理,致所屬北門 分院夜間管理鬆散,人力配置明顯不足,火警受信總 機亦未置於值日室並經常有人看守;復未督促該分院 附設護理之家落實禁煙管制規定,終肇使護理之家住 院病人有違法可趁之機,在嚴禁吸煙屬該分院管理範
3
圍之2 樓婦產科區域,持打火機竟徘徊長達20 分鐘 以上連續縱火2 次,其間所引發之濃烈燒焦味、火光 及濃煙,該分院及護理之家均未能及早察覺,坐失即 時遏阻縱火之先機,洵有重大違失: (一)按前衛生署辦事細則第2 條、第7 條規定:「署長 綜理署務,指揮監督所屬職員及機構……。」、「 醫事處分設六科,各科掌理事項如下:……。二、 第二科:……。(四)關於公立醫院經營管理之督導 及輔導事項。(五)關於公、私立醫療機構業務輔導 事項。……。」、該署前醫院管理委員會設置要點 第2 點規定:「本會任務如下:……本署醫院醫療 業務、服務品質及人員教育之督導事項。……(六) 本署醫院重大採購案之評估審議事項。(七)其他有 關本署醫院營造管理之督導事項。」、前衛生署新 營醫院辦事細則第2 條、第3 條規定:「院長綜理 院務,並指揮監督所屬員工;副院長襄助院長處理 院務。」、「本院設北門分院,分院長負責督辦及 執行分院醫療及行政業務。」。前衛生署於99 年2 月23 日以衛署醫字第0990202981 號公告之「醫療 機構業務外包作業指引」復明定:「……。三、醫 療機構對於外包業務應負全部責任……。五、醫療 機構對於外包業務,應建立管理及監督查核機制。 ……。」。新營醫院與「原臺南縣私立健樂老人養 護中心」分別於94 年5 月10 日及100 年10 月23 日簽訂之「前衛生署新營醫院甄選民間機構投資經 營北門分院護理之家契約書」及「北門分院護理之 家經營案採購案第一次契約條文變更同意書之內容 尤分別載明略以:「本契約由衛生署新營醫院(甲方) 與原臺南縣私立健樂老人養護中心(乙方),雙方茲同 意以民間參與方式,由乙方投資經營護理之家業務
4
,甲方同意於所轄院區內提供所需之場地……。伍 、營運績效評估:……8、照護品質評估:(1)評估 方法:有關乙方之照護品質評估,自營運開始之日 起,由甲方評估……。(2)照護品質評估項目包括人 力配置、人員訓練與考核、住民安全維護……。」 、「……茲因國家政策改變,雙方同意訂定本契約 條文變更並共同遵守,其條款如下:……(二)依據 前衛生署100 年8 月19 日衛署醫字第1O02960857 號函重申:各院辨理業務外包案件,務頇依照本署 99 年2 月23 日衛署醫字第O990202981 號函公告之 『醫療機構業務外包作業指引』規定辦理……。」 。且據前衛生署既查復:「該公立醫院仍肩負對於 該院附設護理之家之管理及監督之責。」等語,則 前衛生署對於所屬新營醫院北門分院暨其附設護理 之家災害預防、夜間管理及住民安全維護等相關事 項之督導、考核及評估,自應責無旁貸,特先敘明 。 (二)據臺南市政府消防局101 年11 月7 日南市消調字第 1010030261 號函附之火災原因調查鑑定書(檔案編號: G12J23Dl)、相關當事人談話筆錄、調查筆錄及偵審書 類、行政調查資料皆指出,前衛生署新營醫院北門 分院於101 年10 月23 日凌晨釀災之主因,主要係 罹有直腸惡性腫瘤合併膀胱轉移、膽囊結石、慢性 阻塞性肺病、心臟節律不整等多病纏身,自99 年 12 月6 日入住北門分院附設護理之家病患林○○, 因該晚多次腹瀉致心情低落,遂以打火機引燃物品 而釀災。經查,林嫌於是日凌晨3 時6 分25 秒(據編 號2 監視器 1鏡頭錄影畫面顯示),即以步行走出北門分院2
1 編號2 監視器鏡頭裝設於護理之家走廊北端盡頭安全門上方,鏡頭方向朝南,監看病房的走廊,最遠 隱約可見走廊最南端靠近婦產科護理站及產房處;編號4 監視器鏡頭則裝設於交誼廳西南
5
樓系爭護理之家病房,改乘輪椅往走廊南方移動;3 時6 分45 秒(據編號4 監視器鏡頭錄影畫面顯示)發現林嫌乘 坐輪椅行經交誼廳時,於靠近走廊桌上隨手取走一 包東西,續往走廊南方前進;3 時7 分12 秒(據編號2 監視器鏡頭錄影畫面顯示)林嫌抵達同樓層西南側之該分院 婦產科護理站,並以打火機點燃衛生紙後,擲向該 護理站櫃臺南側桌下 2,已引發燒焦味 3;3 時26 分 24 秒(據編號2 監視器鏡頭錄影畫面顯示)林嫌離開該婦產科 護理站,將該輪椅停置在該護理站北側哺乳室走道 ,以步行往婦產科西南側產房方向前進,隨後約5 秒鐘影像,並可見一團火光在林嫌左側同步移動, 推測疑為點燃之打火機。林嫌再以該打火機點燃該 產房內堆置之諸多易燃物品後,於3 時27 分6 秒( 據編號2 監視器鏡頭錄影畫面顯示)步出產房,由西南側角落 之安全梯下樓後離院,隨即引發大火及濃煙彌漫。 (三)俱上足證林嫌在嚴禁吸煙 4、非屬護理之家病患活動 範圍而屬該分院管理範圍之2 樓婦產科區域,持打火 機竟可徘徊長達20 分鐘以上時間連續縱火2 次,其 間所引發之濃烈燒焦味、火光及濃煙,以及該等時段 在該2 樓區域不應出現護理之家病患等情,該分院及 護理之家防火管理人員、值班人員、保全人員、火災
側天花板上,鏡頭方向朝東北,監看院民由病房走廊進出交誼廳情形。 2 據臺南市政府消防局火災原因調查鑑定書(檔案編號:G12J23Dl)第20 頁-第21 頁載明略以: 「由於護理站櫃臺與產房相隔約5 公尺,2 處中間為淨空的走廊,並無可燃物供相立延燒 的途徑。另護理站內燒毀的雜物位於櫃臺內側桌子下方,受櫃臺的包圍保護,亦無法受產 房燃燒形成的輻射熱影響而起火燃燒,因此研判婦產科護理站櫃臺內南側桌面下方地板燒 毀面積約0.5m2 雜物,為l 處不相連貫獨立燃燒之起火處」。 3 據前揭鑑定書第14 頁-第15 頁載明略以:「護理之家內發現火災而進行初期滅火的院民顏 ○○於本局談話筆錄中描述:(1)101 年10 月23 日凌晨3 點多,渠躺在212 病房床上還沒 睡著,闖到一股燒焦味,以為是電鍋煮東西燒焦,就坐上輪椅外出查看。結果看到2 樓走 道最南端有火光,於是高喊「發生火災了,趕快報警叫消防車來打火,並推著輪椅前往查 看,途中在走道上拿了l 支滅火器準備滅火。來到2 樓西南側護理站時,看到櫃臺下方有 一堆東西正在燃燒……。」。 4 依據「菸害防制法」第15 條規定,「醫療機構」及「護理機構」為全面禁止吸菸之場所,如發現有違 反菸害防制法之情形,則應通報警衛或地方主管機關。
6
授信、監控系統及相關照護人員、護理人員,竟未能 及早察覺,而係由該護理之家顏姓住院病患最早發現 ,除顯示該分院防火管理機制已然失靈,夜間巡守及 監控措施更徒具形式,猶如無人管理之境外,該分院 及護理之家既為菸害防制法第15 條明定之「禁菸場 所」,北門分院更為同法第21 條規範「得提供戒菸 服務之場所」,前衛生署發布之101~102 年病人安全 年度工作目標,亦明定各醫護機構應針對吸菸病人及 精神科病人加強防範,以減少人為因素引發之火災意 外,其中目標十之3.1 尤規定:「醫療人員應定期作 病人單位危險物品保管安全之查檢,以確保病人之安 全」,自應落實禁煙管制及病人安全維護作為,尤以 該等醫護機構所扮演之健康促進角色,無疑應為其他 禁煙場所之效法對象觀之,該等機構禁煙管制作為尤 應嚴格貫徹實施,然該分院及護理之家卻未能實施禁 煙管制作為及相關措施,甚至縱容留院患者擅自攜帶 打火機、吸煙而荼毒自身並危害他人;又,北門分院 火警受信總機復未置於值日室並經常有人看守,有違 「各類場所消防安全設備設置標準」第126 條:「火 警受信總機之位置,依下列規定裝置:一、裝置於值 日室等經常有人之處所。……。」規定,此分別有臺 南市政府消防局針對北門分院附設護理之家值班護 士,屬新營醫院編制聘請之員工陳○○、黃○○於 101 年10 月24 日製作之談話筆錄內容分別略以:「 問:您們護理之家患者林○○本人有無抽菸習慣?答 :我們護理之家沒有限制患者不能抽菸或一定時間不 能抽菸……我們護理之家沒有在幫患者代保管香菸 及打火機,都由患者自行保管……。」、「問:林○ ○有無抽菸習慣?他都在何處抽菸?答:他有抽菸習慣 。他大部分都在l 樓室外、2 樓交誼廳或2 樓西北側
7
樓梯間抽菸。……。」、「……火警受信總機放在l 樓復健科服務站內就沒有人看守……。」等語,足資 印證。凡此復觀前衛生署、內政部及消防署分別於系 爭火災相關檢討會議、檢討報告及本院約詢前自承及 查復:「場所未能加強行政管理,確切掌控院內員工 及院民數量,審慎防範危險人員的動向……防範人為 縱火意外發生之措施不足。……。」、「縱火嫌犯為 何能在深夜活動至非護理之家範圍,並進行2 次的縱 火,值班人員皆未發覺,及早制止,研判可能因人力 因素、門禁管制,以及對有潛在縱火傾向人員,未加 強輔導及管理所致。……。」等語,益證北門分院及 其附設護理之家管理之鬆散,至為明確。以上並分別 有臺南地方法院101 年度重訴字第28 號判決、臺灣 高等法院臺南分院檢察署102 年度上職議字第2766 號處分書、臺南地檢署102 年度復偵字第8 號緩起訴 處分書、101 年度偵字第14308 號、101 年度營偵字 第1458 號、第1652 號起訴書、臺南市政府警察局案 卷編號101-10-10 現場勘查採證報告、南市警鑑字第 1011023077 號、第1011024031 號刑事案件證物採驗 紀錄表、警訊筆錄、北門分院是日相關錄影檔案及消 防署火災證物鑑定報告(鑑定案件編號:1011227、1012173)附卷 足稽。 (四)復據前衛生署於本院約詢前提供之資料明載略為: 「依上述系爭護理之家火警發生現場僅有1 名陳姓 護理人員值班,及2 名未受過看護訓練之外籍勞工 ,明顯不符規定,且101 年1~3 月、6~10 月凌晨0 時至上午8 時未有書面排定1 位護理人員值班…… 。」、消防署於本院約詢后之補充查復(引據臺南市政府 消防局之說明)略以:「……未依據自衛消防編組之分 班……火警發生該時段上班人員僅4 位,人員不足
8
與防護計畫書內容(按:該局101 年1 月10 日收件核備之消防防 護計畫附件八之夜間、假日自衛消防編組表載明:值班人力為6 名)不符 ……。」、臺南市政府消防局火災原因調查鑑定書 載明略以:「……、三、起火原因研判:(一)火災 概要:1、10 月23 日3 時29 分本局救災指揮中心 接受新營醫院北門分院附設護理之家的1 名院民謝 ○(癱瘓無法下床行動)首通報案電話。」及內政部於101 年11 月8 日邀集前衛生署等相關機關就系爭火災之 主要檢討問題重點載明略為:「(一)防火管理檢討 :護理之家收容行動遲緩或無法行動之年長者,夜 間照護人力配置不足,自衛消防編組未能充分因應 ,致初期滅火、應變及避難逃生失效……。」,且 據審計部102 年1 月30 日臺審部三字第1020000124 號及同年5 月15 日同字第10200OI277 號等函分別 載明略為:「核有:……未依護理機構設置標準排 定護理人員24 小時值班,且迄101 年12 月底,仍 無法釐清火災發生時照護服務員出勤狀況……。」 、「……北門分院附設護理之家101 年l 至10 月每 日凌晨零時至上午8 時時段,僅同年4 至5 月排定 l 名護理人員值班,其餘月份均未依護理機構設置 標準規定排定護理人員值班……。」、「據衛生署 於102 年3 月11 日函稱略以:火災發生當時,北門 分院附設護理之家有3 名照顧服務員在勤,惟與外 包廠商排定班表應有4 名照顧服務員在勤未合。顯 示新營醫院對外包廠商未善盡監督管理之責……。 」等語,足證北門分院及其附設護理之家排班及人 力配置問題叢生,夜間人力配置明顯不足,除未依 規定排定24 小時均有護理人員值班,亦未按班表值 勤外,更與消防防護計畫規劃之人力有違,致使該 等短缺之人力無法按原訂自衛消防編組實施通報、
9
搶救,竟由護理之家謝姓住院病患最先通報消防機 關,已然喪失災害即時察覺及緊急應變之功能,凡 此肇使初期滅火、應變及避難作為逃生失效,不無 因此加重人員傷亡之虞。 (五)綜上,前衛生署及該署新營醫院怠於監督管理,致 所屬新營醫院北門分院夜間管理鬆散,人力配置明 顯不足,火警受信總機亦未置於值日室並經常有人 看守,復未督促該分院附設護理之家落實禁煙管制 規定,終肇使護理之家住院病人有違法可趁之機, 在嚴禁吸煙屬該分院管理範圍之2 樓婦產科區域, 持打火機竟徘徊長達20 分鐘以上連續縱火2 次,期 間所引發之濃烈燒焦味、火光及濃煙,該分院及護 理之家均未能及早察覺,坐失即時遏阻縱火之先機 ,洵有重大違失。 二、前衛生署新營醫院北門分院2 樓產房係屬該分院權責 管理範圍無虞,乃系爭火災之起火處及受創最嚴重場 所,至系爭火災發生前已閒置長達14 年,早為消防 機關及護理之家認定之「倉庫」、「儲藏室」及「雜 物間」,竟未曾適時檢討設置自動灑水系統之必要性 ,致錯失及時遏阻系爭火勢蔓延,甚至於第一時間滅火 之先機,前衛生署及該署新營醫院監督不周,顯難辭 其咎: (一)按本案行為時適用之醫療法第25 條規定:「醫院除 其建築構造、設備應具備防火、避難等必要之設施 外,並應建立緊急災害應變措施。……。」、消防 法第6 條第1 項規定:「本法所定各類場所之管理 權人對其實際支配管理之場所,應設置並維護其消 防安全設備;場所之分類及消防安全設備設置之標 準,由中央主管機關定之。」及依同法同條同項授 權訂定之「各類場所消防安全設備設置標準」第8
10
條、第12 條、第17 條第1 項、第49 條規定:「滅 火設備種類如下:……四、自動撒水設備。」、「 各類場所按用途分類如下:一、甲類場所:……。( 六)醫院、療養院、長期照顧機構……護理之家機構 ……。」、「下列場所或樓層應設置自動撒水設備 :一、10 層以下建築物之樓層,供第12 條第1 款 第1 目所列場所使用,樓地板面積合計在3 百帄方 公尺以上者;供同款其他各目……樓地板面積在 1,500 帄方公尺以上者。……。九、供第12 條第1 款第6 目所定長期照顧機構(長期照護型、養護型、 失智照顧型)……護理之家機構使用之場所,樓地板 面積在3 百帄方公尺以上者。」、「下列處所得免 裝撒水頭:……。八、手術室、產房、X光(放射線 )室、加護病房或麻醉室等其他類似處所。……」。 是前衛生署新營醫院北門分院及其附設護理之家為 依法應設置自動撒水設備之場所,其中產房、手術 室等類似處所雖依其醫療用途及手術作業所需,得 予免設自動撒水設備,但依內政部臺內消字第 1010820815 號函查復,該等機構管理權人應就核准 使用用途使用,如果免設條件遭破壞,亦即已非按 原核准用途使用者,即應回復原核准使用條件或檢 討設置消防安全設備,規定至為明顯。 (二)經查,前衛生署新營醫院北門分院二樓產房非屬護 理之家契約約定經營使用範圍,係屬該分院權責管 理範圍,此分別觀前衛生署、該署新營醫院、消防 署於本院函詢及約詢前查復略以:「……委外範圍 確實未涵蓋起火處之產房……。」、「北門分院消 防防護計畫包含產房……。」、「北門分院2 樓帄 面圖顯示,2 樓供北門分院及護理之家2 場所使用 ,起火地點之產房為北門分院之場所範圍,非屬護
11
理之家承租範圍……。」及「前衛生署新營醫院甄 選民間機構投資經營北門分院護理之家契約書」之 內容載明略以:「……二、(一)履約標的:1、甲 方(新營醫院)提供北門分院醫療大樓2 樓二分之一空 間約1,232 帄方公尺(不含產房),由乙方(護理之家)自行 規劃經營作為執業場地。……。」甚明。 (三)據臺南市政府消防局火災原因調查鑑定書第5 頁、 第9 頁、第10 頁、第14 頁、第18 頁、第24 頁分 別載明略為:「……婦產科產房未上鎖,形成無門 禁管制……。」、「北門分院2 樓南半部樓層約1,000 帄方公尺,為婦產科診間、產房、待產室、護理站 、病房等,院方未使用亦未出租,已閒置多年。」 、「火災現場勘查紀錄及原因研判:一、現場概況 :……(四)本案火勢主要集中在2 樓西南側婦產科 產房,面積約40M2,造成室內物品擺設、防火(蔗) 板及輕鋼架天花板嚴重燒損……。」、「護理之家 護士陳○○於本局談話筆錄中表示,渠於10 月23 日3 時多有聽到消防火警警報聲響,從走廊通道看 到2 樓醫院端西南側儲藏室(產房)上方冒出濃煙… …。」、「火災主要造成2 樓西南側產房全毀…… 室內所有物品擺設嚴重燒損,輕鋼架天花板燒塌, 矽酸鈣板散落一地。……係受產房火勢所產生向上 的烈焰、高溫煙層所造成,火流方向即由產房向外 擴大延燒。」、「利用該空間當作儲藏室,暫放大 量院民的衣服、躺椅、被單、棉被、電風扇、輪椅 、生活用品……及護理之家的空床、發電機、鹽酸 、掃把、拖把……等雜物……。」、「起火處:1 、婦產科護理站櫃臺內南側桌面下方。2、婦產科產 房東側附近。」、前衛生署查復:「本署新營醫院 北門分院大樓自87 年10 月完工,88 年7 月改為新
12
營醫院北門分院,初時設計規劃為綜合醫院,故於 建造即已設有產房。惟至火災發生前,該產房均無 使用紀錄。」、護理之家負責人羅○○、員工黃○ ○、護士陳○○、黃○○等於消防局、警察局之談 話筆錄及調查筆錄分別載明:「問:您們2 樓護理 之家與醫院間如何區分管理?答:……所以在火災前 1 天(22 日)為了將病房內一些衣服、棉被、抽痰機 、輪椅、病床、成人紙尿布、雜物等移置於2 樓醫 院西南側雜物間……。」、「問:起火房間(臺南市 北門區中框里56-3 號西南側儲藏室)帄時作何用途? 該房間內部裝修、物品放置、人員出入、帄時管理 情形?答:……該房間帄時不上鎖……。」、「問: 2 樓左邊倉庫放置何物品?答:堆放雜物(紙類、病 患衣服等)。」、「問:本次火災燒燬2 樓西南側儲 藏室,帄時是誰在管理?答:……2 樓南半部為北門 分院所有,未出租,帄時閒置不用。」、「問:起 火之倉庫有無人管理?答:無人管理。」、「問:請 問醫院2 樓西南側儲藏室都放置何物品?答:有老人 衣服、紙張及裁縫機等物品。問:請問醫院2 樓西 南側儲藏室是誰在管理、使用等?答:我聽主任羅○ ○說西南側儲藏室原是北門分院所有……帄時並無 上鎖……。」等語,足證該產房乃系爭火災起火處 及受災最嚴重場所,自北門分院於87 年間取得使用 執照設立營運以來,該產房迄未使用,至系爭火災 於101 年10 月23 日發生前,顯已閒置長達14 年, 肇使消防機關及護理之家相關人員依現況及經驗早 已直覺認定為「倉庫」、「儲藏室」及「雜物間」 ,顯已非按原核准用途使用,已然符合消防署上揭 所述「未依免設自動灑水系統條件使用之處所」無 虞,竟未曾適時檢討設置自動灑水系統之必要性,
13
致錯失及時遏阻系爭火災火勢蔓延,甚至於第一時 間滅火之先機,此觀消防署於本院約詢前之查復、 約詢時之說明及約詢後補充查復分別略以:「……( 二)自動撒水設備檢討:閒置產房遭人為縱火,大量 可燃物燃燒,因免設撒水,無法初期滅火。……。」 、「問:如果產房有設灑水設備,是否能有效防堵 火災?消防署陳副署長答:如果以本案起火規模,倘 有灑水設備,應可發揮滅火功能。……。」、「火 災發生產生熱、濃煙等生成物……撒水頭動作撒水 ,是能有效侷限火勢,並撲滅火勢,降低空間內之 溫度。」等語甚明。 (四)雖據新營醫院諉稱:「北門分院為遭指定之傳染病 隔離醫院,為避免傳染病疫情防治出現漏洞,在未 解除北門分院為SARS(Severe Acute Respiratory Syndrome, 中文譯名:嚴重急性呼吸道症候群,乃世界衛生組織於92 年3 月15 日新 公布之傳染病;下同)專責應變隔離醫院前,該分院不得 任意變更用途……。」、「該產房雖閒置不用,但 未曾變更用途……。」云云。惟依傳染病防治醫療 網作業辦法第6 條第2 項第2 款、第7 條、第8 條 第2 項、第9 條分別規定:「……前項醫院之指定 作業程序,得以下列方式之一為之:……二、由區 指揮官就轄區醫療資源分配,依傳染病房設置原則 審核後,送請中央主管機關指定之。……。」、「 隔離醫院應聘有臺灣感染症醫學會認定之感染症專 科醫師或中央主管機關指定之醫學會專科醫師。」 、「應變醫院於未發生傳染病疫情時,傳染病隔離 病房得移作一般病房使用。」、「隔離醫院之指定 ,有效期間為3 年,期滿得展延1 次或重新指定。 隔離醫院有下列情事之一者,中央主管機關得變更 或廢止其指定:一、隔離病房未符合第6 條第2 項
14
第2 款規定。二、未符合第7 條規定。」,以及前 衛生署於本院約詢後提供之補充查復資料自承:「 其負壓隔離病房自92 年間啟用後未收治傳染病患 並存放大量防疫物資……『在未解除北門分院為 SARS 專責應變醫院前,該分院不得任意變更用途』 乙節,本署未曾接獲相關單位公文書通知之訊息。 」等語,足證北門分院自SARS 於92 年間流行後, 既未曾收治傳染病患,疫情結束逾3 年後,復未見 該分院依前開程序重新被審核、指定為傳染病隔離 醫院,且依該署提供之該分院醫事人員執業登記名 冊,僅見外科、精神科及復健科專科醫師登錄,並 未見感染症專科醫師或中央主管機關指定之醫學會 專科醫師,在在突顯該分院自SARS 疫情結束後是否 持續仍為傳染病隔離醫院,已非無疑。 (五)又,新營醫院既稱:「北門分院為SARS 專責應變醫 院,不得任意變更用途」等語,理應該分院建築物 四層樓全部空間皆不得變更,然該分院2 樓1 半以 上及3、4 樓部分空間,自SARS 疫情結束後,已分 別自診療室變更為護理之家,及自病房變更為辦公 室,明顯已變更用途,足證新營醫院說詞及舉措明 顯矛盾難採;況且負壓隔離病房係設置於北門分院 3 樓,顯與該分院2 樓產房空間無涉。再者,消防 機關相關文書及護理之家相關人員依現況及經驗既 早已直覺認定該產房為「倉庫」、「儲藏室」及「 雜物間」,益見該產房「實況」已非作產房使用, 顯已另作他途,且據前衛生署自承:「產房係屬『 特殊病房』,非急性一般病床,因負壓隔離病床(設 置於該分院3 樓)屬急性一般病床,應與產房變更無涉… …。」等語,尤證該院指稱:「北門分院為SARS 專責應變醫院」、「不得任意變更用途」等節,皆
15
屬無據,悉屬飾卸之詞,委無可採。 (六)綜上,前衛生署新營醫院北門分院2 樓產房係屬該 分院權責管理範圍,乃系爭火災之起火處及受創最 嚴重場所,至系爭火災發生前已閒置長達14 年,早 為消防機關及護理之家認定之「倉庫」、「儲藏室 」及「雜物間」,竟未曾適時檢討設置自動灑水系 統之必要性,致錯失及時遏阻系爭火勢蔓延,甚至 於第一時間滅火之先機,前衛生署及該署新營醫院 非但迄未據實檢討反省,猶飾詞脫責,顯難辭監督 不力之咎,核有重大違失。 三、前衛生署及該署新營醫院怠於督促所屬建立北門分 院2 樓產房等閒置空間巡檢機制,甚至縱容所聘僱之 保全人員未將其列入保全巡邏範圍,肇生該分院安全 管理之漏洞,致使該護理之家有機可趁,擅將大量可 燃物品堆置於北門分院2 樓產房後而未上鎖,肇使病 患得以進入縱火;其堆置之大量可燃物品無異成為助 長火勢引發大量濃煙竄流,引發護理之家住院病患重 大傷亡之禍源,顯有重大違失: (一)按醫療法第56 條明定:「醫療機構應依其提供服務 之性質,具備適當之醫療場所及安全設施。」。復 按新營醫院除應對外包業務負全部責任,並應建立 管理及監督查核機制之外,對於北門分院及其附設 護理之家住民安全維護事項,尤應善盡督導、考核 及評估之責,此分別於衛生署發布之「醫療機構業 務外包作業指引」及新營醫院與系爭護理之家簽訂 之外包契約定有明文,已詳前述(調查意見一之(一)) ,先予敘明。 (二)據前衛生署及消防署分別查復略為:「……新營醫 院雖有定期辦理履約監督管理,惟未能及早發現產 房被不當利用,由於該護理之家係醫院之外包單位
16
,新營醫院應具備更高之敏感性與警覺性。但該院 於本次事件後仍應深切檢討各該單位帄時之監督工 作是否落實……。」、「(4)管理面部分:a.新營醫 院辦理外包業務履約監督管理,未能注意巡檢民間 機構將易燃物堆置於產房,以致發生失火。……。 」、「……(3)本次縱火點為產房,但被充作儲藏室 使用,故火勢難以控制,故是否落實閒置產房之管 理、確實上鎖及檢查等,均為本次災後回顧及檢討 之重要事項。……。」、「本案為人為縱火,空間 使用不當所造成,主要為護理之家及北門醫院管理 不善,應負其責任。……。」,且據審計部102 年 1 月30 日臺審部三字第1020000124 號及同年5 月 15 日同字第10200OI277 號等函之說明分別載明略 為:「……核有北門分院2 樓閒置空間未設置每日 安全檢查機制,無法即時發現閒置產時遭外包廠商 私自堆置雜物,致使病患得以進入縱火……。」、 「未比照新營醫院排定主管人員(例假日排定行政人員) 每日巡視分院,係委由保全人員於每日夜間負責巡 邏院區及醫療大樓l 樓及4 樓(2 樓部分空間因委託廠商經營 護理之家,另2 樓閒置空間及3 樓供作前衛生署指定收治感染症之負壓隔離 病房則因帄日均上鎖未用,故未列入保全巡邏範圍),致該分院安全管 理出現漏洞,無法即時發現2 樓閒置之產房遭外包廠 商私自堆置雜物且未上鎖……。」、「依新營醫院提 供之保全公司北門分院勤務流程資料所列,保全公司 每1 小時巡邏院區及5 樓病房、每2 小時巡邏l 樓等 ,並不含2 樓,顯示該分院2 樓產房確無每日安全檢 查機制,未能即時發現該產房遭外包廠商私自堆置雜 物。」等語,以及護理之家負責人羅○○、員工黃○ ○、護士陳○○、黃○○等於消防局、警察局之談話 筆錄及調查筆錄,在在足證北門分院除任由該產房閒
17
置之外,竟未比照新營醫院排定主管人員(例假日排定行 政人員)每日巡視,甚至縱容所聘僱之保全人員未將其 列入保全巡邏範圍,肇生該分院安全管理之漏洞,凡 此怠忽作為,致使該護理之家有機可趁,擅將大量可 燃物品堆置於北門分院2 樓產房後而未上鎖。核該產 房遭大量堆放之可燃物近乎布滿該產房空間致僅留 狹小走道,無異助長系爭火勢之擴大、悶燒及濃煙 之竄流,此分別有臺南市政府消防局火災原因調查 鑑定書載明:「利用該空間當作儲藏室,暫放大量 院民的衣服、躺椅、被單、棉被、電風扇、輪椅、 生活用品……及護理之家的空床、發電機、鹽酸、 掃把、拖把……等雜物……以上物品大多裝在紙箱 或大垃圾袋內,由產房四面牆壁旁往內堆疊,由於 擺放的雜物太多,僅留門口至中央處的空間,形成 一狹小走道……。」及該府查復:「濃煙無法排出 乃因現場(產房)起火處堆置甚多易燃物,其火載量 過大,燃燒後釋出大量濃煙,使得濃煙無法於短時 間內完全排出」等語,附卷足憑。 (三)前衛生署及該署新營醫院雖辯稱:「系爭火災前, 護理之家為應付翌(23)日前衛生署評鑑,未經該院 同意,逕將相關雜物擅自堆置該產房……係護理之 家擅自使用所致。」云云,然查,新營醫院與系爭 護理之家於94 年5 月10 日簽訂之「前衛生署新營 醫院甄選民間機構投資經營北門分院護理之家契約 書」之內容既載明略以:「……參、營運:(一)甲 方(新營醫院)合事項:……3、協助護理之家評鑑業 務。……。」。顯見護理之家評鑑業務,新營醫院 負有協助之責,則該護理之家為應付評鑑之相關作 為,該院豈能諉為不知,自難藉詞脫責,況且該院 帄時如對該產房善加管理,護理之家焉能知悉該產
18
房有偌大空間可資使用而有擅自堆置大量可燃物之 機會,進而助長火勢、濃煙散布,加劇傷亡人數, 凡此復觀內政部、前衛生署於災後針對系爭火災之 檢討意見明載略以:「四、問題研析及說明:……( 二)自動撒水設備檢討:1.……惟閒置產房遭人為縱 火,大量可燃物燃燒,無法初期滅火。……」,以 及臺南地檢署102 年度復偵字第8 號緩起訴處分書 、101 年度偵字第14308 號起訴書載明略為:「… …濃煙並致使護理之家共計數十名院民嗆傷,以及 院民謝○森等13 名院民呼吸性休克窒息死亡…… 。」等語,益證前衛生署及該署新營醫院怠於監督 管理,殆無疑義。 (四)綜上,前衛生署及該署新營醫院竟怠於督促所屬建 立北門分院2 樓產房等閒置空間巡檢機制,甚至縱 容所聘僱之保全人員未將其列入保全巡邏範圍,肇 生該分院安全管理之漏洞,凡此怠忽作為,致使該 護理之家有機可趁,擅將大量可燃物品堆置於北門 分院2 樓產房後而未上鎖,肇使病患得以進入縱火 ;其堆置之大量可燃物品無異成為助長火勢引發大 量濃煙竄流,引發護理之家住院病患重大傷亡之禍 源,顯有重大違失。 四、前衛生署新營醫院明知護理之家住院病患皆屬重症且 行動不便者,逃生必頇仰賴多人協助,避難並應以水帄 避難為主,卻疏未將此特性督促北門分院及護理之家於 帄時充分納入消防防護計畫據實規劃逃生路線及值班 人力,自衛消防編組演練亦未確實就此特性實施,致系 爭火災發生時無以因應,延誤黃金搶救時效,殊有重大 違失;臺南市政府消防局未能據實審核、實地抽驗該消 防計畫、演練紀錄是否符合場所特性,亦有違失: (一)按本案行為時適用之消防法第11 條第1 項、第13
19
條第1 項規定:「地面樓層達11 層以上建築物、地 下建築物及中央主管機關指定之場所,其管理權人應 使用附有防焰標示之地毯、窗簾、布幕、展示用廣告 板及其他指定之防焰物品。」、「一定規模以上供公 眾使用建築物,應由管理權人,遴用防火管理人,責 其製定消防防護計畫,報請消防機關核備,並依該計 畫執行有關防火管理上必要之業務。」、同法施行細 則第13 條、第15 條規定:「本法第13 條第1 項所 定一定規模以上供公眾使用建築物,其範圍如下:… …六、醫院、療養院、養老院。……。」、「本法第 13 條所稱消防防護計畫應包括下列事項:滅火、通 報及避難訓練之實施;每半年至少應舉辦1 次,每次 不得少於4 小時,並應事先通報當地消防機關。」及 內政部93 年3 月15 日內授消字第0930090503 號、 94 年1 月31 日同字第0940092676 號等公告及函分 別載明略以:「指定面積150 帄方公尺以上之醫療機 構、護理機構及安養機構為應實施防焰制度場所。」 、「增列長期照護機構……護理之家機構……為應實 施防火管理之場所。」。復按醫療法第25 條規定: 「醫院除其建築構造、設備應具備防火、避難等必要 之設施外,並應建立緊急災害應變措施。前項緊急災 害應變措施及檢查辦法,由中央主管機關定之。」。 依醫療法第25 條第2 項規定授權訂定之「醫院緊急 災害應變措施及檢查辦法」第5 條、第6 條、第7 條、第8 條復明定:「醫院發生緊急災害時,應立即 採取應變措施,並迅速聯繫警察、消防、衛生及其他 有關機關,即時支援搶救。」、「醫院應訂定緊急災 害發生時之疏散作業方式,規劃病人、員工及醫療設 備疏散之路線、疏散地點及病人運送方式,並保障疏 散過程中,相關人員之安全。……。」、「醫院應指
20
派適當人員,協助嬰帅兒及行動不便病人之疏散。」 、「醫院應設置緊急災害之通訊設備及相關設施,並 建立通訊與聯繫之標準作業方式。」。爰此,前衛生 署新營醫院北門分院及系爭護理之家面積皆達1 千 帄方公尺以上,既屬消防法明定之「一定規模以上供 公眾使用建築物」、「應實施防火管理之場所」及「 應實施防焰制度場所」,前衛生署新營醫院自應確實 依消防法、醫療法上開各規定,並落實外包契約約定 事項督促北門分院及系爭護理之家落實防火管理、預 防、緊急應變、疏散演練、通報及病人安全維護之責 。尤以北門分院附設護理之家留院病患皆屬重症且行 動不便,亦多屬高齡者,避難逃生爰以「應有足適人 力協助病患逃生,並以水帄避難為主」為首要原則, 此分別觀臺南市政府警察局學甲分局偵查隊於101 年10 月23 日針對護理之家黃姓護士(時任北門分院副護理 長)之調查筆錄略以:「問:2 樓之病患是屬於何種病 患?答:均是不良於行及重症之病患,大部分均是老 人家比較多。」及前衛生署、內政部檢討報告載明: 「……(三)防火區劃檢討:避難弱勢族群之避難逃生 應以水帄避難為主,垂直避難為輔。……。」等語自 明,前衛生署新營醫院對此收容病患特性既瞭然於胸 ,尤應督促該二單位據實將該等避難逃生原則充分納 入消防防護計畫務實規劃,從而就此人力、避難動線 確實實施自衛消防編組演練,以預防及因應災害之發 生,合先敘明。 (二)經綜整臺南市政府消防局、消防署、前衛生署於本院 履勘、函詢及約詢時之歷次函復、說明、查復分別略 以:「北門分院及護理之家之管理權人及防火管理人 未完全負起防火管理業務之所有責任。」、「實際疏 散路線係由消防單位到場後,依消防戰術判斷做出最
21
有利的疏散方式……。」、「……然雖未將水帄疏散 納入規劃,但護理之家收容之病患大部分為三管(鼻管 、胃管、氣切管)且不良於行病患(多為長期臥床),基於後續 照顧考量,最終仍應該將病患垂直疏散至一樓送往醫 療設備完善且具有專業護理人員照顧之醫療院所… …。」、「……未依據自衛消防編組之分班……火警 發生該時段上班人員僅4 位 5,人員不足與消防計畫書 內容不符……。」、「依新營醫院查復,火災發生時 ,北門護理之家人員第一時間無通報新營醫院總機… …本署新營醫院則由急診室值班人員於凌晨約4 時 20 分側聽REOC(Regional Emergency Operation Center,區域緊急 醫療應變中心)獲知北門分院火災後,通報值班護理長後 立即通知潘分院長。……潘分院長約5 時10 分抵達 北門分院,約10 分鐘後院長抵達,30 分鐘內其餘各 科室主管亦陸續到達現場。」、臺南市政府消防局火 災原因調查鑑定書載明略以:「……、三、起火原因 研判:(一)火災概要:1、10 月23 日3 時29 分本局 救災指揮中心接受新營醫院北門分院附設護理之家 的1 名院民謝○(癱瘓無法下床行動)首通報案電話。摘錄 其119 電話報案錄音內容略約:『護理之家內有聞到 燒起的味道,你們趕快來』」及內政部於101 年11 月8 日邀集前衛生署、各縣市政府、內政部營建署、 社會司、建築研究所及消防署共同召開「研商前衛生 署新營醫院北門分院附設護理之家火災案檢討暨因 應對策會議」之主要檢討問題重點 6載明略為:「(一) 防火管理檢討:護理之家收容行動遲緩或無法行動之 年長者,夜間照護人力配置不足,自衛消防編組未能
5 據臺南地檢署起訴書資料,其中1 位為應付隔日前衛生署評鑑,工作至夜晚而留置院區加 班,並非排定之值班人員,故實際值班人員應僅為3 位。 6 依據內政部101 年11 月23 日臺內消字第1010820811 號函及消防署查復本院資料。
22
充分因應,致初期滅火、應變及避難逃生失效……。 」等語,足見系爭火災發生是日凌晨,北門分院附設 護理之家夜間人力不足,除明顯與臺南市政府消防局 核備之消防防護計畫所載內容不符(已詳前述),甚至未 按原訂自衛消防編組實施通報、搶救、疏散,竟由護 理之家謝姓住院病患最先通報消防機關,猶迨消防局 隊員抵達時,始開始規劃實際疏散動線,顯已嚴重遲 延搶救時效,此觀前衛生署自承略以:「……新營醫 院於本次事件仍應深切檢討帄時各單位之監督工作 是否落實、人員的排班是否符合相關規範……。」、 「有鑑於本次係為人為縱火而導致傷亡嚴重災情,針 對事件中重要環節,包括:……(2)該護理之家雖有 辦理演習,惟火災事件發生時,緊急應變程序是否確 實參照應變計畫執行。……。」及消防署查復:「依 據消防防護計畫及自衛消防編組,由編組任務分工, 該時段之自衛消防編組通報班人員,應負責通報消防 機關」等語,益資印證。 (三)又,北門分院及護理之家值班人員未按上揭消防防 護計畫及自衛消防編組即時通報消防機關、衛生機 關及新營醫院等相關機關,顯與醫療法前開規定有 違,致北門分院院長、新營醫院院長暨相關主管人 員遲至火災發生近2 小時始相繼趕抵火場,洵已緩 不濟急,喪失自衛消防編組指揮協調分工之應變功 能。凡此肇使初期滅火、應變及避難作為逃生失效 ,不無因此加重人員傷亡之虞。復經比較消防署及 臺南市消防局提供之火場疏散動線示意圖後發現, 北門分院2 樓及護理之家人員與其病患之實際疏散 動線,係往2 樓戶外帄臺疏散,與北門分院及護理 之家提報該局核備之消防防護計畫所載之逃生避難 動線,係自各樓層樓(逃生)梯垂直疏散為主,明顯
23
不符,此有前衛生署暨新營醫院自承:「無法與既 有規劃的疏散路徑一致。」等語,足資佐證。顯見 新營醫院未據實將「避難應以水帄避難為主」等情 充分納入消防防護計畫考量,因而未曾將「2 樓戶 外帄臺」作為避難逃生路線,在在顯證該消防防護 計畫及自衛消防編組不無為應付檢查而虛應故事, 致遇災時毫無實效可言,此觀潘代理院長於本院約 詢時自承:「問:演習是否都在虛應故事?答:國內 大部分應該都是為應付檢查用的。」等語自明,前 衛生署及該署新營醫院均核有怠於監督管理之違失 ;臺南市政府消防局未能據實審核並實地抽驗該消 防防護計畫及自衛編組演練情形有否符合該等場所 特性,而逕予核備,亦難辭違失之責,此分別觀內 政部、前衛生署於系爭火災後之檢討意見載明略以 :「……。四、問題研析及說明:(一)防火管理檢 討:……。5.防火管理制度督導方式偏重於專卷管 理及書面資料成果,應再深入了解業務實際推行之 狀況(例如:分隊執行演練及驗證之內容、查核表填寫是否確實等), 以求落實且深入的執行制度,另應現場抽測自衛消 防編組人員並納入督導考核之項目。……。」,以 及消防署分別查復略為:「消防機關可藉由場所每 半年辦理之滅火、通報及訓練或自衛消防編組演練 時機,檢視消防防護計畫是否符合場所特性,並施 予相關行政指導。」、「消防機關至場所安檢如發 現消防防護計畫與實際情況明顯不符,得依消防法 第40 條規定要求業者限期改善。」等語甚明。 (四)雖據新營醫院及臺南市政府消防局分別表示:「因本 案場所收容人員大部分屬無行動能力者……故實際 疏散動線與原消防防護計畫載明之動線略有不同… …。」云云,然該院及該局斯時撰寫及核備該消防防
24
護計畫時,針對「該分院及護理之家收容人員大部分 屬無行動能力者」以及「2 樓戶外帄臺可資作為行動 不便者避難之用,以爭取搶救時效」等情,早應知悉 甚篤,此觀消防機關查復:「……除北側中央樓梯搬 運下樓直達大門外,另將病患疏散及搬運至戶外帄臺 ,再以雲梯車載送至一樓以爭取時效,由救護車護送 至適當醫院就醫,遠比以4 人之力將病患搬送至一樓 更為迅速……。」等語益明,從而自應據此撰寫消防 防護計畫。況且,倘該分院及護理之家帄時自衛消防 編組係按實需確實演練並於事後不斷驗證,自應充分 體認「必頇有足適之人力始能協助該護理之家達70 餘位行動不便病患逃生」等情,確實模擬假日或夜間 等人力薄弱時段之情境實施,以確保收容人員各所在 位置皆得以順暢逃生,並於排定各班實際班表時,即 應按消防防護計畫所載留置足適人力值班,焉能於是 日火災凌晨北門分院僅有1 名保全駐守,護理之家更 僅排定3 人值班,如何協助該70 餘位行動均不便病 患之逃生與疏散,已無庸贅言。再者,自衛編組相關 人員帄時倘確實演練,早應熟悉其分班、編組及搶救 時扮演之角色,當能在消防人員抵達前,迅速依各自 編組,判斷火災狀況,採取有效自衛消防活動,確實 發揮早期預警、及時滅火、有效引導避難之初期應變 功能,豈能迨消防局人員到達時始進行實際疏散,俱 此益證相關計畫、編組皆流於形式,悉淪為應付檢查 之表面文章,終肇生該護理之家院民傷亡率達100% (13 死、55 傷,扣除縱火者林嫌;另受傷4 人為4 樓精神病房院民)之重大 災害,前衛生署、該署新營醫院及臺南市政府消防局 胥難辭管理不力、審核及檢查不周之責。 (五)綜上,前衛生署及該署新營醫院明知系爭護理之家住 院病患屬重症且行動不便者,逃生必頇仰賴多人協助
25
,避難並應以水帄避難為主,卻疏未將此特性督促北 門分院及該護理之家充分納入消防防護計畫據實規 劃逃生路線及值班人力,自衛消防編組演練亦未確實 就此特性實施,肇生實際人力配置不足、自衛消防編 組毫未啟動、通報失序,以及該計畫未將戶外帄臺等 水帄避難動線納入規劃致與實際逃生路線不符等甚 多重大缺失,致系爭火災發生時無以因應,延誤黃金 搶救時效,核有監督不周及疏於管理之重大違失;臺 南市政府消防局未能據實審核、實地抽驗該消防計畫 、自衛編組演練有否符合場所特性及實際所需而逕予 核備,亦難辭違失之責。 五、前衛生署新營醫院北門分院附設護理之家夜間照護人 力不足,致系爭火災緊急應變編組無以啟動,搶救作為 失措,值班護理人員更因人力短缺急於搶救而不慎跌倒 ,此景令人同情與不捨,突顯前衛生署長期漠視全國護 理人員權益,而怠未審慎律定醫護機構各班別照護人力 標準,無異縱容國內醫護機構僅消極地以總人力符合設 置標準即可,至於各班人力是否足以因應病患照護需求 及災害之應變、護理人員是否超時工作、有否正常輪休 ,皆坐視不理,迭經本院促請該署改善,猶未正視,顯 未善盡中央衛生主管機關之職責,洵有怠失;臺南市政 府衛生局及新營醫院未確實查核,猶稱該護理之家值班 及人力符合規定,亦有違失: (一)按醫療法第12 條第3 項規定:「醫療機構之類別與 各類醫療機構應設置之服務設施、人員及診療科別 設置條件等之設置標準,由中央主管機關定之。」 、護理人員法第5 條、第16 條、第23 條、第23-1 條規定:「本法所稱主管機關:在中央為前衛生署 ;……。」、「護理機構之設置或擴充,應先經主 管機關許可;其申請人之資格、審查程序與基準、
26
撤銷、廢止及其他應遵行事項之辦法,由中央主管 機關定之。護理機構之分類及設置標準,由中央主 管機關定之。」、「護理機構應依法令規定或依主 管機關之通知,提出報告,並接受主管機關對其人 員配置……安全……等之檢查及資料蒐集。」、「 中央主管機關應視需要,辦理護理機構評鑑。…… 。前項評鑑標準,由中央主管機關定之。」及依護 理人員法第16 條第2 項授權訂定之「護理機構分類 設置標準」第2 條、第8 條規定:「護理機構,分 類如下:……。二、護理之家。……。」、「護理 機構之設置,其設置標準如附表『護理機構設置標 準表』。」。前衛生署辦事細則第7 條、第8 條尤 分別明定:「醫事處分設六科,各科掌理事項如下 ……:五、第五科:(一)關於醫事人力(含醫師、護 理師、護士、藥師、醫檢師、放射師……)之規劃、 控制及協調事項。……。」、「護理及健康照護處 分設三科,各科掌理事項如下:一、第一科:(一) 關於長期照護政策擬定事項。……。(五)關於各類 照護人力規劃及培訓事項。(六)其他有關照護業務 相關事項。二、第二科:(一)關於護理、助產業務 政策規劃及業務推動事項。……。」是前衛生署允 應落實中央衛生主管機關職責,對於國內各類醫護 機構醫事及照護人力妥為規劃,據此務實訂定相關 醫事、護理政策及其人力設置、照護標準,爰先敘 明。 (二)據內政部、臺南市政府於本院函詢、約詢時提供之 檢討意見分別明確指出:「避難弱勢族群場所之照 護人力檢討」、「建議重新檢視『護理機構設置標 準表』……是否規定每班之護理人員與照顧服務員 人數……。」,且據審計部102 年1 月30 日臺審
27
部三字第1020000124 號函之說明一載明略為:「 核有……未依護理機構設置標準排定護理人員值 班……現行醫護機構構設置標準及評鑑基準與防 災有關規定,已無法確實保障醫護機構發生火警時 人員及病患之生命安全……。」,以及本院上開各 調查意見已指證歷歷等情,足證系爭護理之家是日 火災發生時之護理人員及照護員人力不足,無法因 應災害時對需照護者之保護、疏散、急救等任務, 相關機關並迭有設置與照護標準應否檢討之相關 意見,前衛生署及臺南市政府衛生局早應對此知悉 甚詳,從而妥為因應。 (三)針對上情,前衛生署及臺南市政府衛生局分別於本 院履勘、函詢及約詢時表示略以:「依護理之家設 置標準,該護理之家核准床數80 床,故應配置護理 人員(15 床應有1 人)5.3 位,照顧服務員(5 床應有1 人)16 位,該護理之家實際分別配置6 位及16 位,符合規 範……該規範並未規範每一班別護理人員及照顧服 務員之人力,故依該規範審視,系爭護理之家當晚 之人力是符合中央規定之人力的。」云云,顯見中 央、地方衛生主管機關非但未基於護理人員權益妥 為爭取,亦未依消防法及「醫院緊急災害應變措施 及檢查辦法」等規定確實審視該護理之家及北門分 院系爭火災是日有無確實依該等單位消防防護計畫 及醫院緊急災害應變措施配置足適人力,反而僅狹 隘地就該總人力設置標準欲圖替該護理之家脫責。 復據審計部前開函暨102 年5 月15 日臺審部三字第 10200OI277 號函具證指出:「……北門分院附設護 理之家101 年l 至10 月每日凌晨零時至上午8 時時 段,僅同年4 至5 月排定l 名護理人員值班,其餘 月份均未依規定排定護理人員值班……。」、「…
28
…北門分院附設護理之家未依規定排定護理人員 24 小時值班,臺南市政府衛生局查核結果卻認符合 規定等缺失……。」、「……護理之家總人數符合 ,但人力出勤狀況與班表不符。……。」、「新營 醫院迄101 年底止仍無法釐清火災發生時照護服務 員出勤狀況」,前衛生署於本院約詢前提供之資料 亦明載略為:「依系爭護理之家火警發生現場僅有 1 名陳姓護理人員值班,以及2 名未受過護理機構 看護訓練且非系爭護理之家聘僱之外籍勞工【註:經該 署查詢勞委會100 年9 月7 日勞職許可字第1001385928 號函、100 年12 月28 日勞職許可字第1001391130 號函,該2 名外籍勞工經核准之聘僱機構分別為 健樂老人養護中心、樂健心邨養護中心,並非系爭護理之家】,明顯不符 規定,且101 年1~3 月、6~10 月凌晨0 時至上午8 時未排定1 位護理人員值班……外包單位新營醫院 負責監督管理……地方各該主管機關則依法辦理衛 生、消防管理與督導考核及其相關違規查處等事項 之督考,本署並未接到地方衛生主管機關告知新營 醫院人力不符規定之情事……本署均多次重申各院 皆需依規定行事。」、「本署於接獲臺南市政府衛 生局102 年4 月10 日南市衛醫字第1020059725 號 函說明火災事件當時照護人力包含2 名外籍看護工 ,但據該局數次陳報本署該機構照護人力資料皆未 提及此2 名外籍看護工……另據新營醫院北門分院 提供火災當時照護人力名單,亦未提及此2 名外籍 看護工……。」等語,足見系爭護理之家未依規定 排班及配置人力,臺南市政府衛生局及新營醫院卻 於帄時未善盡監督、管理及檢查之責於先,於系爭 火災後復未確實查復本院於后,猶稱該護理之家符 合規定,顯有欠當。 (四)再者,醫護機構護理人員實際工作型態係1 天3 班
29
制(人力係數應以3 計),倘加計每年應休日數(人力係數應以 1.5 計),則實際需求人力應再乘以4.5 係數,始屬 合理,方符合實際。然前衛生署對此人員應予排班 、輪休等情知悉甚篤,本院相關調查案件亦多次促 請該署正視,該署卻怠未審慎考量各班醫事、護理 、照護人力之實際需求,因而未將各班相關人力基 準及前揭休假、輪班係數納入妥為規範,突顯該署 長期漠視全國醫事、護理人員權益,因而未曾審慎 律定國內各醫護機構各班別照護人力標準,無異縱 容國內各醫護機構僅消極地以總人力符合該設置 標準即可,至於各班醫事人員等人力是否足以因應 病患醫療、照護需求與災害之疏散、應變,以及醫事 人員是否超時工作、有否正常輪休,皆坐視不理,核 該署消極怠慢舉措,不無僅慮及該等機構之經營、 人事成本,而置醫護人員權益於不顧,顯未善盡中 央衛生主管機關職責,核有怠失;臺南市政府衛生 局及新營醫院未確實查核,猶稱該護理之家值班及 人力符合規定,亦有違失。 六、前衛生署為護理人員法之中央主管機關,明知護理機 構設立宗旨係為因應連續性醫療照護之需,服務對象 以罹患慢性病或出院後需長期護理之病人為主,相關 護理專業及實務經驗乃經營者必備條件,卻坐令所屬 新營醫院北門分院與未具護理機構經營經驗之原臺 南縣私立健樂養護中心簽訂護理之家外包契約,該中 心負責人王○○亦非該護理之家開業執照合法登記 之負責人,更不具醫護專業,顯名實不符;其開業申 請核准適用之法令條款復相互扞格矛盾,竟同時出現 公立護理機構及私立護理機構二種身份,前衛生署、 該署新營醫院及臺南市政府衛生局監督及審核不力 ,均有違失:
30
(一)按護理人員法第1 條、第8 條、第14 條、第15 條 規定:「中華民國人民經護理人員考詴及格,並依 本法領有護理人員證書者,得充護理人員。前項考 詴得以檢覈行之;其檢覈辦法,由考詴院會同行政 院定之。」、「護理人員執業,應向所在地直轄市 或縣(市)主管機關送驗護理人員證書,申請登記, 發給執業執照。……。」、「為減少醫療資源浪費 ,因應連續性醫療照護之需求,並發揮護理人員之 執業功能,得設置護理機構。」、「護理機構之服 務對象如左:一、罹患慢性病需長期護理之病人。 二、出院後需繼續護理之病人。三、產後需護理之 產婦及嬰帅兒。」。同法立法說明 7並明載:「護理 人員之管理,關係醫療保健服務品質至鉅。內政部 前於53 年將『護士管理規則』修正為『護理人員管 理規則』,嗣經前衛生署於71 年修正,並適用至今 。由於近年來國民對護理工作及醫療照護之需求殷 切,現行規則對護理人員業務、責任與管理之規範 不足。為期今後有效管理護理人員並強化其執業功 能,以提昇護理人員服務品質,爰參酌外國制度及 針對我國實際需要,擬具『護理人員法』草案,凡 7 章,計58 條,茲分述其重點如次:……第三章護 理機構之設置及管理:明定護理機構之設置或擴充 之許可程序、標準及其開業,及其申請開業執照之 程序與申請人之資格……。其立法理由說明略以: 為因應民眾健康照顧需求,配合政府發展老人、慢 性病產婦及嬰帅兒之照顧政策,爰參照助產士法第 三章:『助產所之設置及管理』之體例,於本法中 明定本章,將護理機設置及管理納入規範,以保障
7行政院79 年1 月25 日第1266 次會議決議通過,同年2 月6 日以臺79 衛字第02147 號送請立法院審議, 資料來源:立法院79 年3 月3 日印發之院總第1538 號,政府提案第3729 號之議案關係文書。
31
病人權益」。是國內護理機構之設置宗旨,乃為因 應連續性醫療照護之需求,並發揮護理人員之執業 功能,其服務對象係以罹患慢性病或出院後需長期 護理之病人為主,相關護理專業及照護經驗爰屬經 營者必備條件無虞,除求其名實相符之外,更確保 醫療保健服務品質,合先陳明。 (二)經查,北門分院位處臺南市北門沿海偏遠地區,人 口稀少,醫療資源缺乏,前身為烏腳病防治中心, 嗣因照顧偏遠地區民眾醫療權益所需,爰於現址規 劃興建該分院,性質屬綜合醫院,至87 年完工啟用 後,營運效益未達預期,遂有委外經營之構想,前 臺南縣議會第14 屆第6 次定期大會於總質詢時並建 議北門分院規劃轉型為安養院經營,經原臺南縣政 府以90 年1 月30 日90 府社福字第013448 號函請 前衛生署以同年2 月15 日九十衛署中字第0002392 號函復該府略以:「本署新營醫院北門分院全面委 託經營案,業經3 次上網公告徵詢經營業者,均無 單位提出申請。爰此,本署擬將新營醫院北門分院、 臺南醫院新化分院合併委託經營,本署中部辦公室 已於90 年1 月3 日召開『本署臺南醫院新化分院、 新營醫院北門分院甄審會聯席會』第一次會議;會 議決議 8:『兩分院合併委託之經營者基於地方需 求,經與地方溝通協調後,得調整醫院病床數及功 能。』」北門分院爰重新公告招商,經三次上網公 告仍無廠商提出申請。新營醫院院長遂赴前衛生署 專案報告,經該署專家委員會議建議該案繼續辦 理,並建議採商議方式徵求北門分院經營者。時至 92 年4 月間,逢SARS 流行期間,前衛生署指示北
8 依據:90 年2 月15 日九十衛署中字第0002685 號函。
32
門分院成立「SARS 專責醫院」,承擔感染症防治任 務,並設置負壓隔離病房。SARS 過後,為避免北門 分院空間閒置,新營醫院續依「促進民間參與公共 建設法」第5 條第2 項、第8 條第1 項第4 款等規 定及前衛生署93 年5 月7 日署授中字第093310014 8 號函附該署「民間參與公共建設法規定通案授權 一覽表 9」,採ROT(Rehabilitate-Operate-Transfer,即整 建→營運→移轉 10)方式辦理北門分院委外廠商甄審事 宜,並著手辦理先期規劃及可行性評估作業,於同 年9 月8 日至20 日上網公告,至同年9 月間雖經公 開甄選出一家合格廠商,然該廠商考量北門分院地 處偏僻,交通不便,營運恐不符經濟效益,旋於簽 約前放棄議約。嗣因該案屬於行政院斯時列管之施 政計畫,行政院公共工程委員會特於94 年3 月1 日召開會議瞭解該分院遲無法順利委外原委,會中 專家乃建議新營醫院略以:「……提高本案民間投 資誘因,請主辦機關朝延長特許營運期間方向規 劃……。」。新營醫院遂依該會之建議,將委託經 營年限由原訂5 年延至10 年,重新上網公告徵求廠 商,至同年4 月12 日甄選結果,僅「原臺南縣私立 健樂老人養護中心」遞件參選,並經評定符合甄審 標準而獲選,旋於同年5 月10 日相互簽訂「前衛生 署新營醫院甄選民間機構投資經營北門分院護理之 家契約書」之內容略為:「本契約由前衛生署新營
9 據前衛生署查復,本案促參案件間投資金額為94,600,000 元整,依該授權一覽表規定,民間投資 金額未達壹億元者授權各醫院辦理,免報該署核定,故本案係由新營醫院院長決行案件。 10 採此促參模式可減輕政府在維修或進行更新老舊公共建設時之財政支出,與BOT 模式相較,ROT 係在既有公共建設上從事整建修復工作,投資金額較少,而BOT 則是從事全新公共建設的建造, 投資金額較大,興建期較長。資料參考來源:法務部,「促參法」研析意見,該部部長94 年9 月 21 日第1024 次部務會報指示事項號次6 及部長同年10 月8 日指示事相、孫秀芝,「民間機構參 與公共建設經營模式與財務評估之研究—以中山大學學生宿舍興建案為例」,國立中山大學財務管 理研究所碩士論文,91 年6 月。
33
醫院(甲方)與健樂老人養護中心(乙方),雙方茲同意以 民間參與方式,由乙方投資經營護理之家業務,甲 方同意於所轄院區內提供所需之場地;而乙方亦同 意在甲方提供之場地內,投資相關設備、醫事執業 人員等;業務費用以收費分配之合作方式提供醫療 服務……:……二、(一)履約標的:1、甲方提供北 門分院醫療大樓2 樓二分之一空間約1,232 帄方公 尺,由乙方自行規劃經營作為執業場地。2、乙方負 責提供護理之家業務。3、工作人員:由乙方提供醫 師、照顧服務人員、護理師……。(二)投資經營契 約期間:1、本投資經營期間自契約簽訂日起,94 年5 月10 日至104 年5 月9 日止,合計10 年,表 現優良得優先續約10 年。……。」。 (三)據前衛生署及臺南市政府衛生局查復,與新營醫院 簽訂系爭護理之家外包契約之原臺南縣私立健樂養 護中心,負責人為王○○(獸醫背景),於參加該甄選前 ,渠暨該養護中心均欠缺醫護專業,且欠缺護理機 構經管經驗。復據該護理之家經原臺南縣衛生局於 94 年12 月15 日核發之南縣衛護字第7541190539 號「護理機構開業執照」載明如下:「施○○(時任北 門分院院長,於101 年10 月9 日換發執照,申請人改為新營醫院醫師邱○○) 申請護理機構開業登記,核與護理人員法規定相符 合予發給開業執照並摘錄登記事項如下:名稱:前 衛生署新營醫院北門分院附設護理之家。地址:臺 南市北門區中樞里56-3 號2 樓。負責人:羅○○。 」。足見王○○除未具護理機構經管經驗,更非該 護理之家合法登記之負責人,新營醫院對此知悉甚 詳,竟仍與渠簽訂系爭護理之家外包契約,顯名實 不符,此觀前衛生署自承:「對於具備養護中心經 營經驗的私人業者,可否與公立醫院簽約經營護理
34
之家,惟就機構設置標準面觀之,機構管理者部分 ,養護機構僅規範專任院長(主任)綜理機構業務,督 導所屬工作人員善盡業務責任,又護理機構則依法 要求由資深護理人員擔任負責人對其機構護理業務 ,負督導責任,且設置標準中,護理機構護理人員 要求亦高於養護機構,即為考量住民對專業之需求 ;爰此,雖法尚未明定養護中心經營經驗的私人業 者不可與公立醫院簽約經營護理之家,然就相較上 開兩者設置標準及護理人員聘用等條件,仍以具有 護理機構相關經營經驗者為宜」等語甚明。 (四)雖據前衛生署及新營醫院分別表示:「系爭護理之家 屬公立護理機構,斯時依護理人員法第17 條規定, 由時任北門分院院長施○○擔任申請人,機構負責人 則由資深護理人員羅○○擔任。……。由醫院代表人 為申請人,有別於私立護理之家由個人設置者,資深 護理人員即可擔任申請人之精神,在於公立護理機構 之申請人為醫院代表人,爰該公立醫院仍肩負對於該 院附設護理之家之管理及監督之責。」、「依據護理 人員法第3 章護理機構之設置及管理規定,其內容並 無規範申請新設護理之家應具備護理之家相關營運 管理經驗。王姓負責人於系爭護理之家設立前擁有2 年以上安養機構經營管理經驗,具備老人照護基本經 驗,再加上以資深護理人員羅○○為負責人協助管理 ,應已足以妥善經管系爭護理之家。」云云。 (五)惟查,前衛生署既明確查復:「就機構設置標準面 觀之,機構管理者部分,養護機構僅規範專任院長( 主任)綜理機構業務,督導所屬工作人員善盡業務責 任,又護理機構則依法要求由資深護理人員擔任負 責人對其機構護理業務,負督導責任,且設置標準 中,護理機構護理人員要求亦高於養護機構,即為
35
考量住民對專業之需求」等語,顯見護理之家有其 專業與特殊性,其經營經驗、資格與養護機構明顯 有別,自難相提並論,該署及新營醫院卻表示:「 王姓負責人於系爭護理之家設立前擁有2 年以上安 養機構經營管理經驗,具備老人照護基本經驗…… 應已足以妥善經管系爭護理之家。」云云,明顯前 後相悖,要難採信。 (六)甚且,前衛生署既稱系爭護理之家為公立護理機構 ,爰依護理人員法第17 條第1 項第1 款規定:「護 理機構之開業,應依左列規定,向所在地直轄市或 縣(市)主管機關申請核准登記,發給開業執照:一 、公立護理機構:由其代表人為申請人。二、財團 法人護理機構:由該法人為申請人。三、私立護理 機構:由個人設置者,以資深護理人員為申請人; 由其他法人依有關法律規定附設者,以該法人為申 請人。」向主管機關申請核准登記,其申請人理應 為當然負責人,卻以「私立護理機構」適用之同法 同條文同項第3 款規定,由私人羅○○擔任申請人 ,從而羅員為該開業執照登載之負責人;易言之, 系爭護理之家竟同時具「公立護理機構」及「私立 護理機構」二種身份,明顯扞格矛盾,其法令之適 用,顯有疑慮,益證系爭護理之家相關甄選資格、 核准標準及其法律適用,洵欠周妥。 (七)綜上,前衛生署為護理人員法之中央主管機關,明知 護理機構設立宗旨係為因應連續性醫療照護之需,服 務對象以罹患慢性病或出院後需長期護理之病人為 主,相關護理專業及實務經驗乃經營者必備條件,卻 坐令所屬新營醫院北門分院與未具護理機構經營經 驗之原臺南縣私立健樂養護中心簽訂護理之家外包 契約,該中心負責人王○○亦非該護理之家開業執照
36
合法登記之負責人,更不具醫護專業,顯名實不符; 又,系爭護理之家開業申請核准適用之法令條款復相 互扞格矛盾,竟同時出現公立護理機構及私立護理機 構二種身份,前衛生署、該署新營醫院及臺南市政府 衛生局分別難辭監督及審核不力之責,均有違失。 七、國內醫療養護機構近20 年已發生64 起火災事故,釀 成傷亡人數高達150 人,帄均每年發生3.2 次,7 人 以上傷亡,造成國家社會成本之損失顯難以計數,其 中不乏經本院調查竣事後促請內政部、前衛生署檢討 改進者,然「行動不便病患暨夜間疏散逃生演練不足 且虛應故事」、「水帄避難動線及措施未臻完備」、 「空間未能形成獨立區劃,造成煙霧竄流而加劇傷亡 人數」及「縱火預防措施不足」等問題,洵屬國內醫 療養護機構防火避難措施之共同沉痾,前衛生署及內 政部卻迄未積極設法研謀改進,於系爭火災猶再發生 ,悉難辭改善不力之責,均有疏失: (一)據消防署以101 年11 月14 日消署預字第1010501266 號函請各級地方消防主管機關調查之結果,近 20(82~101)年,國內醫療機構、護理機構、安養機構( 簡稱醫療養護機構)計發生火災64 次,致34 人死亡、116 人輕重傷,帄均每年發生3.2 次,釀成7 人以上傷亡 ,造成國家社會成本之損失顯難以計數。其中災情較 為嚴重者如下:82 年7 月5 日,財團法人林口長庚紀 念醫院燒燙傷加護病房電線走火,造成靠呼吸器維生 之女病患因無力逃生而死亡;87 年1 月15 日,新北 市中和區興南路2 段54 巷14 號之慈民安養中心因電 氣設備走火,致收養老人11 死10 傷慘劇;89 年5 月6 日,宜蘭縣宜蘭市仁愛醫院第二院區深夜發生火 警,造成該院年老及行動不便之住院病患8 死18 傷 之重大災害;89 年5 月11 日,宜蘭縣宜蘭市佛教普
37
門醫院凌晨遭縱火,造成11 人受傷意外;94 年1 月 25 日,南投埔里基督教醫院因地下室空調走火釀災, 約500 多名住院病患被緊急撤離;97 年12 月17 日, 國立臺灣大學醫學院附設醫院東址院區發生火災,除 造成4 間手術室損毀及1 名手術中病患死亡、13 名醫 事人員、駐衛警遭濃煙嗆傷之外,更影響住院及安排 開刀之病患逾千人。是該等災害之慘痛教訓殷鑒不遠 ,相關主管機關自應引以為鑒,針對相關缺失切實檢 討改進,以確保公共安全。 (二)經查,國內醫療養護機構上揭災害頻傳,突顯「行動 不便病患暨夜間疏散逃生演練不切實際且虛應故事」 、「水帄避難動線及措施未臻完備」、「空間未能形 成獨立區劃,造成煙霧竄流而加劇傷亡人數」及「縱 火預防措施不足」等問題至為重要,洵屬國內醫療養 護機構防火避難措施之共同沉痾,基於人命無價及公 共利益,相關主管機關顯難再以「醫療養護機構之改 善成本」及「法律不溯及既往」等由脫責,內政部基 於建築法、消防法、老人福利法(原第3 條第1 項所列屬內政部 之權責事項,自102 年7 月23 日起改由衛生福利部管轄)等中央主管機 關及前衛生署基於醫療法、護理人員法等中央主管機 關職責,早應主動共同積極設法研謀改進。然據本院 上開各調查意見、內政部邀集前衛生署等相關主管機 關檢討報告之重點及相關主管機關查復本院資料分別 載明略以:「……空調通風與空間區劃檢討:該樓層 樓高約6 公尺,隔間牆僅隔至天花板,未延伸至樓板 ,天花板與樓板間約有高3 公尺的蔓延空間,空間未 能形成獨立區劃,造成煙霧竄流。……。」、「…… 本案為人為縱火,空間使用不當所造成。……。」、 「相關機關開會檢討,後續因應對策如下:(一)強化 場所……疏散……措施。(二)強化場所防火管理及防
38
焰措施。(三)強化消防安全設備。(四)檢討建築技術 規則建築設計施工編第99 條之1。(五)落實避難弱勢 族群場所公共安全檢查。……。」等語,足見相關問 題於系爭火災猶再發生,前衛生署及內政部迄未積極 設法研謀改進,皆難辭改善不力之責,核均有疏失。
調查委員:林鉅鋃 尹祚芊 劉玉山
FD06151 | 2013_台湾_新竹新埔镇住宅火警_监察院纠正案文.pdf
分类:06_境外及港澳台调查报告 | 年份:2013 | 地域:台湾 | 严重程度: | 场所:住宅/民房 | 起火原因:电气;纵火 | 来源格式:pdf
1 糾 正 案 文
壹、被糾正機關:新竹縣政府、內政部消防署。 貳、案 由:新竹縣新埔鎮於102 年1 月15 日發生住宅 火警,新竹縣政府消防局救災救護指揮中 心未善盡調度、聯繫之能事,貽誤緊急救 護之先機,且該府辦理轄內狹小巷道清查 不實,違章建築查報作業不力,對於公共 使用通道被佔用之情況竟束手無策,影響 建築物防火及火災救援行動;內政部消防 署未能嚴格落實消防監督管理工作,亦未 建立使用人自我管理之機制,且未能落實 消防車輛通行之法治化,均有違失。 參、事實與理由: 新竹縣新埔鎮育賢街38 巷O 號O 樓於民國(下同)1 02 年1 月15 日發生住宅火警,案經本院實地履勘,並約 詢內政部消防署、新竹縣政府及消防局與第一大隊新埔 分隊(下稱新埔分隊)相關人員,業經調查竣事,茲將相 關違失事項列舉如下: 一、新竹縣新埔鎮育賢街38 巷O 號O 樓於102 年1 月15 日發生住宅火警,起火原因係屬人為縱火所致,造成 屋主林O 榮1 人死亡及財物損失約30 萬元,實屬家 庭悲劇,新竹縣政府允應藉由社會救助及福利予以支 助;另刑事責任部分,尚待檢警偵查及法院審理,合 先敘明。 (一)按刑法第173 條第1 項規定:「放火燒燬現供人使 用之住宅或現有人所在之建築物者,處無期徒刑或 7 年以上有期徒刑。」同法第271 條第1 項規定: 「殺人者,處死刑、無期徒刑或十年以上有期徒刑 。前項之未遂犯罰之。」依據新竹縣政府警察局新
2 埔分局偵辦「0115 專案」報告指出:「102 年1 月 15 日19 時許發生火警,造成屋主林O 榮1 人死亡 ,涉嫌人林O 良坦承因與家人金錢糾紛,抽取其自 己之003-BRD 號重型機車油箱內汽油,並於客廳內 點火不慎致其手部及臉部遭燒燙傷,縱火後隨即奪 門而出,隨後騎乘該部003-BRD 號普通重型機車逃 離火災現場。全案以殺人、公共危險等罪嫌,移請 臺灣新竹地方法院檢察署偵辦。」且內政部消防署 火災證物鑑定報告(鑑定案件編號第1022012 號、 送驗日期102 年1 月17 日)顯示:「客廳茶几燃燒 殘留物檢出汽油類易燃液體。…嫌疑人林O 良身上 背心燃燒殘留物:檢出甲苯溶劑成分。」 (二)又據新竹縣政府消防局所製火災現場勘查紀錄及 原因研判略以:「由報案人、現場燃燒後情形及消 防人員出動觀察記錄可知,火災現場位於新竹縣新 埔鎮育賢街38 巷O 號O 樓…本案起火處所為客廳 茶几附近,並未發現引火爐具設備;該戶僅火場關 係人林O 良在家中有抽菸習慣,客廳內帄時無燒香 拜拜習慣;另外,對面住戶趙○瑞先生發現起火戶 家中吵架爭執聲音到發現火源從大門竄出發生時 間甚短;消防局火災調查人員勘查起火處所客廳茶 几附近,未發現有電器產品且附近電線亦未有短路 熔痕情形。是以,排除用火、引火不慎、遺留火種 蓄積熱源或電氣因素進而引發火災之可能性。…本 案關係人林O 良臉部及身體有嚴重火焰灼傷情形, 遭警察所查扣之羽絨外套明顯有受燒之碳化燒痕 。…起火處所採集證物送消防署作易燃性液體殘跡 檢驗,鑑定結果為汽油類易燃液體,符合火場關係 人林O 良談話筆錄所自述當時縱火手法及位置。是 以,本案火災係屬人為縱火所致,起火原因為林O
3 良於火災前至家中以汽油縱火,造成此次火災。」 (三)復查人為縱火因素之火警,其時間及空間具有不確 定性,導致無法事前預防;且縱火者所使用之汽油 類易燃液體,具有高度揮發性及釋熱率,導致火災 未能依「初期」、「成長期」、「最盛期」、「衰 退期」之標準燃燒態樣逐漸成形,標準火災自微火 源以至成形時間約為10 分鐘,然本案係因縱火使 用之促燃劑而將火勢直接帶入最盛期,火災自起燃 以至成形,僅相隔約30 秒之瞬間,明顯壓縮容許 逃生之時間,在此極短之避難黃金時間內,消防力 之介入係為終結火災之最後手段。據上事證研判, 起火原因係屬人為縱火所致,嫌疑人林O 良係死者 林O 榮之子,因財務問題與家人爭吵而涉嫌縱火, 造成屋主林O 榮1 人死亡及財物損失約30 萬元, 實屬家庭悲劇,新竹縣政府允應藉由社會救助及相 關福利措施予以支助。 二、新竹縣政府消防局救災救護指揮中心初期搶救未能 落實執勤官指揮功能,亦未善盡調度、聯繫之能事; 復因現場指揮官錯估火勢之凶猛,未能掌握應變之時 機與措施,而貽誤緊急救護之先機,且未備妥各項救 災戰力之裝備及器材,均有疏失。 (一)依據「各級消防機關救災救護指揮中心作業規定」 第3 點規範各級指揮中心編組及職掌,其中總值日 官、執勤官及執勤員之主要職掌分別為「消防安全 全般狀況之掌握、處理及聯繫」、「受命救災救護 之指揮、調度及聯繫,全般災情狀況之分級陳報」 及「襄助執勤官掌握、處置全般狀況,受理報案與 受理災情報告查詢」。復據「消防機關火場指揮及 搶救作業要點」第3 條規範略以:「火場救火指揮 官任務包括:負責指揮人命救助及火災搶救部署任
4 務、指揮救護人員執行緊急救護及災情回報及請求 支援等事宜。」係為提升火場指揮能力,強化火災 搶救效率,以發揮整體消防戰力。經查當日19 時 18 分第4 通火警報案通話紀錄內容顯示: 報案人(女性):我們這邊失火了。 受理員:對,在育賢街附近嗎? 報案人:對,可以再快一點嗎?有人受困,可以 再快一點嗎? 受理員:小姐我們已經派車過去了,小姐,那一 個人是在5 樓嗎? 報案人:對。 受理員:他是在哪裡受困,在窗戶或陽台?你知 道嗎? 報案人:(遲疑)在外面。 受理員:外面是不是,在陽台嗎? 報案人:(遲疑)在後面的門,後門。 受理員:在後門是不是? 報案人:對。 受理員:我們知道了,我們已經派車過去了。 報案人:麻煩快一點。 受理員:知道,謝謝。 (二)詢據新竹縣政府消防局查復略以:「新埔分隊於19 時12 分接獲派遣案件,19 時13 分出動新埔11 車 水箱車、新埔61 車水庫車、新埔92 車救護車,共 3 車6 名消防人員。新埔11 車於19 時18 分到達現 場,已見火焰由建築物5 樓正面窗戶竄出,並從無 線電得知火場約有3 人受困,救火指揮官新埔03 小隊長林○發評估現場狀況後,立刻協助佈線後操 作11 車,並指派隊員柯政佑、彭建諭及張政豐著 消防衣鞋帽佈一線入室搜救滅火;另外評估道路狹
5 窄後,立刻告知新埔水庫車停放於義民路與育賢街 口待命隨時準備中繼供水,並指派隊員田洋裕帶領 後續到達之義消入室搜救。救火指揮官約於19 時 27 分下樓梯間時,始聽見民眾呼喊在建築物5 樓後 側有受困者,此時方可確定受困者林O 榮於門後呼 救,且白煙不斷竄出,新埔03 立刻派現場義消到 新埔11 車上掛梯、梯子及水帶進行架梯搶救及佈 水線防護,同時間新埔03 至新埔11 車確認水量及 壓力供應正常後,並指派義消利用11 車前方之消 防栓供水給新埔11 車後,再回去受困者下方處查 看,但因升梯梯子高度不足,現場熱心民眾搬取鐵 工專用長梯來搶救,並協同現場義消緊急升梯,但 仍離受困者距離約1.5 公尺左右,佈線搶救無效之 狀況,約3 分鐘後受困者林O 榮背部已有著火現象 ,火勢瞬間由內部往外部竄出侵襲受困者全身。」 又參據壹電視林姓記者現場拍攝影片之還原狀況 略如下表。
時間 歷時 畫面內容 19時25分20秒 15秒 附近民眾在起火戶正面圍觀火勢,火舌 已從窗戶竄出,且從民眾圍觀表情顯 示,未發現5樓民眾受困。 19時25分57秒 20秒 鏡頭仍在正面拍攝,可清楚看見屋內充 滿火光,顯示記者尚未發現北側5樓有 人受困。 19時26分25秒 4分28秒 聽到有人呼叫,記者與消防小隊長跑至 北側,發現受困者林O榮在5樓門邊呼 救,消防人員1分鐘後(19時27分)取來 長梯,歷經2分54秒後,林O榮約於19時 29分遭火襲。 19時31分44秒 41秒 30秒時出水(射水防護時間19時32分) (三)再查新埔分隊第一時間於19 時18 分到達起火戶之
6 消防水箱車(新埔11,車長7.4 公尺、寬2.45 公尺 、高3.15 公尺),係由新埔分隊所在廣和路左轉中 正路接義民路一段後,右轉進入育賢街,再右轉育 賢街38 巷進入。其中育賢街38 巷兩側停放汽、機 車,消防車勉強尚可進入,但晚間時段交通稍顯壅 塞,又於2 處轉彎點減速前進,至起火建築物搶救 部署約費時5 分鐘。惟在19 時18 分之相同時間點 ,指揮中心即接獲第4 通火警報案通話應可知悉「 受困者位於5 樓後面陽台」,但現場救火指揮官卻 因指揮入室部署水線,於19 時27 分下樓之際始發 現建築物5 樓後側有受困者之存在,顯示初期搶救 指揮中心未能落實執勤官指揮功能,亦未善盡調度 、聯繫之能事,致失初期9 分鐘掌握現場狀況之先 機。復因當時受困者林O 榮所處鐵皮違建之陽台出 口,陽台過小致受困者無法關上鐵門而站立於外, 出口處有大量白煙不斷竄出,受困者在5 樓門邊呼 救越來越是緊迫,地面上消防人員卻因現場環境無 欄杆及女兒牆不利掛梯操作,且雙節梯架設無法到 達5 樓,此時附近熱心民眾周政玄取來鐵工專用長 梯進行架設,惟距受困者尚不足1.5 公尺之高度。 且因受困地點建築物內部堆積雜物,打開出口後新 鮮空氣釀造閃燃之發生,現場指揮官發現受困者後 約2 分54 秒的搶救時間,火勢即瞬間由內部往外 部竄出侵襲受困者,屋主林O 榮在眾目睽睽下被活 活燒死。現場指揮官未能掌握緊急應變之時機與採 行有效措施,且第一時間小型雲梯車未到達現場, 救災雙節梯、三節梯及掛梯長度不足,又無救生氣 墊可供架設,而貽誤緊急救災搶護之關鍵3 分鐘。 (四)綜上,本案火警發生於102 年1 月15 日19 時12 分 新埔分隊於19 時13 分出動6 人3 車,於19 時18
7 分陸續到場,消防人員於路程中即由無線電得知火 場有民眾受困,到達現場時火舌已從建築物正面窗 戶竄出,符合人為縱火因素之火源成形。惟依據19 時18 分火警電話報案紀錄即可顯示「受困者位於5 樓後面陽台」之訊息;且參據媒體現場拍攝影片可 知,受困5 樓屋主林O 榮於19 時29 分遭火襲吞噬 而當場身亡,令人難忍悲慟。故新竹縣政府消防局 救災救護指揮中心初期搶救未能落實執勤官指揮 功能,亦未善盡調度、聯繫之能事;復因現場指揮 官錯估火勢之凶猛,未能掌握應變之時機與措施, 而貽誤緊急救護之先機,且未備妥各項救災戰力之 裝備及器材,均有疏失。 三、新竹縣政府消防局辦理轄內狹小巷道清查不實,未能 事前實地通盤瞭解本案火警現場,忽略該起火點僅可 由單一方向出入,部署消防救災車輛受限;對於配置 狹窄巷道之消防設備不足,肇致緊急救難之黃金時間 未能掌握、處置全般狀況,亦無法發揮消防勤務規劃 之功能,核有違失。 (一)按消防法第4 條規定:「直轄市、縣(市)消防車輛 、裝備及其人力配置標準,由中央主管機關定之。 。依據「直轄市縣市消防車輛裝備及其人力配置標 準」第3 條至第5 條規定略以:「直轄市、縣(市) 消防機關消防車輛及裝備,得視轄區特性、消防人 力等實際狀況配置。不滿5 萬人之鄉(鎮)每1.5 萬 人配置消防車1 輛…其設有分隊者,消防車基本配 置至少2 輛。…直轄市、縣(市)消防機關配置雲梯 消防車,每車得配置8 人至10 人之消防隊員。」 又據「消防機關火場指揮及搶救作業要點」第7 條 規定:「整備各式搶救資料包括甲種搶救圖(相關 街道、建築物位置、樓層高度、可供消防救災車輛
8 出入等)、乙種搶救圖(轄內高危險特定區域或違規 建築物…並註記各對象物可供救災運用之消防設 備、位置、數量及供人命救助、災害搶救參考之內 部設施資訊)、高危險對象搶救部署計畫圖。抵達 火場處置之車輛部署,以『車組作戰』及『單邊部 署』為原則,三樓以上建築物火場正面空間,應留 給高空作業車使用。又現場水線部署以爭取佈線時 間及人力為原則。室內佈線適用較低樓層,室外佈 線係利用雲梯車、雙(三)節梯加掛梯及由室內垂下 水帶等方式部署水線,適用較高樓層。抵達火場後 ,應優先進行人命搜救任務。」等火災搶救作業要 領。 (二)經查本案火災起火戶之建物與原竣工圖不符,北側 鐵皮加蓋,陽台懸空,且鐵門無欄杆及女兒牆設計 ,不利掛梯操作,5 樓民宅位處育賢街38 巷道路寬 度約5 公尺,巷道長且兩側均因附近民眾私自劃設 停車格停放汽機車,且該巷道轉彎處1 樓住戶雨棚 凸出外牆超過1.5 公尺,影響消防搶救車輛通行。 復查新竹縣新埔鎮總人口數近3.5 萬人,新竹縣政 府消防局於新埔鎮設有新埔分隊,該局獲報火警, 前後派遣新埔、竹北、關西分隊、光明分隊,計水 箱車4 輛、水庫車3 輛、雲梯車2 輛、救護車2 輛 前往現場搶救。惟新埔分隊並未配備氣墊,目前僅 於竹北、新工、竹東三個分隊配備氣墊,新埔分隊 亦未設有雲梯車,鄰近的竹北、關西分隊的雲梯車 分別於19 時28 分、19 時36 分才到達現場,但此 時單一方向出入的狹小巷道,不僅無法進入,而且 巷道內已塞滿新埔分隊的水箱車與水庫車,火警後 16 分鐘才到場的雲梯車僅能停放於義民路1 段的外 圍路上,無法發揮應有之功能。又新竹縣轄內可進
9 入4 公尺巷弄之小型雲梯車,僅於湖口分隊(高度 17 公尺)與關西分隊(高度22 公尺)配置,其數量顯 然不足,該局所備置之消防車輛亦未能符合轄區內 的實際需求。 (三)再查新竹縣政府消防局各分隊轄內狹小巷道清冊 ,新埔分隊列有「文華路115 巷」等16 處紅區、 「新關路五埔段980 巷」等3 處黃區及「和帄街292 巷」等2 處藍區危險等級之狹小巷道,新埔鎮育賢 街38 巷並未列入清冊之中,顯見新竹縣政府消防 局辦理轄內狹小巷道清查不實,無法據此劃設禁停 紅線或黃線,更無此區域高危險對象搶救部署計畫 圖,且無具體實地演練,導致難以據此火災搶救作 業要領進行現場搶救。是以,新竹縣政府消防局辦 理轄內狹小巷道清查不實,未能事前實地通盤瞭解 本案火警現場,忽略該起火點僅可由單一方向出入 ,部署消防救災車輛受限;對於配置狹窄巷道之消 防設備不足,肇致緊急救難之黃金時間未能掌握、 處置全般狀況,亦無法發揮消防勤務規劃之功能, 核有違失。 四、新竹縣政府對於建築管理與違章建築查報作業,未善 盡監督管理之責,造成建築物外牆裝修及違規使用雨 篷等設置障礙物,影響建築物防火及火災救援行動; 又對於公共使用之通道被佔用、堵塞消防車進出之狀 況竟束手無策,核有怠失。 (一)按建築法第48 條、第73 條第2 項、第91 條第1 項第1 款分別規定:「直轄市、縣(市)(局)主管建 築機關,應指定已經公告道路之境界線為建築線。 但都市細部計畫規定須退縮建築時,從其規定。前 項以外之現有巷道,直轄市、縣(市)(局)主管建築 機關,認有必要時得另定建築線;其辦法於建築管
10 理規則中定之。」「建築物應依核定之使用類組使 用,其有變更使用類組或有第9 條建造行為以外主 要構造、防火區劃、防火避難設施、消防設備、停 車空間及其他與原核定使用不合之變更者,應申請 變更使用執照。」「違反第73 條第2 項規定,未 經核准變更使用擅自使用建築物者,處建築物所有 權人、使用人…新臺幣6 萬元以上30 萬元以下罰 鍰,並限期改善。」復據違章建築處理辦法第4 條 第1 項規定:「違章建築查報人員遇有違反建築法 規之新建、增建、改建、修建情事時,應立即報告 主管建築機關處理,並執行主管建築機關指定辦理 之事項。」並依據內政部75 年3 月24 日台內營字 第368907 號函示略以:「私設道路係依建築技術 規則建築設計施工編第2 條所留設,或其他依法令 規定設者,既屬建築執照核發要件之一,自不得有 擅自改道或變更形狀等情事,否則得依建築法第90 條後段(現行條文為建築法第91 條第1 項第1 款) 規定處分之。」均有明文。 (二)本案起火戶新竹縣新埔鎮育賢街38 巷O 號O 樓之建築 物係於81 年10 月7 日領得建都字第1561 號建築執照 ,且於83 年2 月4 日領得建都字第147 號使用執照, 惟現存有北側自行加蓋之鐵皮密閉違章建築,當其唯 一逃生出入口陷入火海,且該違建物後方北側陽台 開口未設圍籬、欄杆、女兒牆,屋主亦未裝設逃生 器具,致消防人員無法即時有效搶救受困者。有關 火災建物與原竣工圖不符之查處事項,詢據新竹縣 政府查復:本案建物有屋後增建情形,涉及違章建 築部分業已依102 年1 月17 日府工使字第102000 9593 號函請新埔鎮公所依違章建築處理辦法查報 處理。另附近建物並無違章建築相關檢舉及公所查
11 報資料,該府又於102 年2 月4 日通知該建築物1 2 號及16 號各樓層違章建築住戶,將依規排定拆除 等語。顯見該府行政作業緩不濟急,對於建築管理 與違章建築查報作業,未能善盡監督管理之責。 (三)查本案火警無法即時有效搶救之原因,包括:起火 戶之建築物正面為臨私設通路寬5 公尺,兩旁停放機 車,1 樓設有遮雨棚;育賢街8 公尺道路帄時兩側停車 ,且育賢街38 巷弄入口右側劃設私人停車格,導致消 防車輛進出巷道困難。然有關私設通路遭附近居民擅 自違規劃設停車格,侵占巷道妨礙出入之責任追究, 本院於102 年3 月15 日詢據新竹縣政府相關主管人員 表示:「本案該巷道為私設通路且仍為私有土地,供 該巷道居民使用。…內政部92 年函頒之『劃設消防 救災活動空間指導原則』,火災建築物係83 年間 領有使用執照,且查該巷道為私設通路,致未及引 用。」明顯消極應對,且敷衍推諉而束手無策,核 有怠失。 五、內政部消防署未能嚴格落實消防監督管理工作,對於 尚未成立公寓大廈管理委員會之5 層以下民宅,亦未 能建立使用人自我管理之機制,允應依火警災害特性 、人口分布、救援到達所需交通時間及都市化密集程 度,增加消防設備及強化消防人員訓練;且消防法尚 無消防車輛通行及救災之法律授權,致「劃設消防車 輛救災活動空間指導原則」未具法令效力,亦未能落 實消防工作法治化,核有疏失。 (一)按消防法第1 條、第6 條第1 項後段分別規定:「為 預防火災、搶救災害及緊急救護,以維護公共安全 ,確保人民生命財產,特制定本法。」「場所之分 類及消防安全設備設置之標準,由中央主管機關定之 。」復查「各類場所消防安全設備設置標準」自78
12 年6 月29 日即已發布實施,惟因公共場所及自用 住宅之火災頻傳,造成人民生命財產之損失,且消 防安全設備工程技術日新月異,為求消防安全設備 之設置,更周全、合理、可行,各類場所消防安全 設置允應與時俱進,以強化消防安全防護體系之硬 體設施,確保消防安全。 (二)公共消防安全係構建和諧社會之重要保障,政府應 落實預防火災、搶救災害、緊急救護及應急疏散方 案之制定與演練,以確保人民生命財產包括,並應 督促個人自家採取消防安全防範措施及設置消防安 全設備,減少火災隱患。惟詢據內政部消防署查復 :對於5 層以下住宿類建物免設消防安全設備之公 共安全防護機制,乃因消防安全檢查係以公共場所 為主,集合住宅類似場所之消防安全設備設置與檢 查,涉及人權與隱私等因素,故以防火宣導為主, 並需徵得住戶之同意始得進行。現階段之住宅防火 宣導係為內政部92 年1 月23 日函頒「住宅防火對 策暨防範電氣火災執行計畫」,請各消防機關據以 訂定細部計畫,結合社區婦女防火宣導隊深入社區 居家,以轄內高危險群及老舊社區為優先訪視對象 ,進行各種訪視,提出各項具體改善作為等語。 (三)然我國住宅密度極高,市區停車位嚴重不足,目前 狹小巷道內多屬5 層以下住宿類建物,由於其建築 與環境空間因素導致火災搶救不易,內政部消防署 僅採防火宣導之措施,尚難落實消防監督管理工作 ,對於迄未成立公寓大廈管理委員會之5 層以下民 宅,亦未建立使用人自我管理之機制。內政部消防 署允應針對狹小巷道建築物災害特性及因應作為 ,提出具體改善對策,並擬定協助社區儘速確定消 防安全管理人、制定防火公約、配備必要消防器材
13 、組織防火檢查巡查之機制,方可透過社區民眾之 參與救援,以提升整體防災能力。本案新竹縣新埔 鎮102 年1 月15 日住宅火警,受困屋主在眾人眼前 遭火襲吞噬而當場身亡,透過媒體報導令人難忍悲 慟,實屬沉痛之火災事故,凸顯違規建築阻礙救災 逃生之教訓極其深刻,尚存搶救漏洞、消防死角及 縱火之危險性,更顯示出現場救災戰術作為及人命 救助之細微環節,充分暴露出狹小巷道火警之消防 安全重點事項,對國人生命財產具有重大影響,應 引以為消防安全教育之案例。 (四)另有關架設氣墊、替代軟墊及雙節梯長度不足之狀 況,宜就重力加速度之觀點切入,受困者位處高度 約12 公尺的5 樓陽台,若忽略空氣阻力而往下跳 ,其墜地剎那最高速度約每秒15.34 公尺,換算成 時速為每小時55.2 公里。再依據牛頓第二運動定 律:「物體隨時間變化之動量變化率和所受外力之 和成正比」,落地時地面衝擊力與碰地剎那時間乘 積即為動量變化。假設受困者體重50 公斤,碰地 剎那接觸時間為0.1 秒,則落地即得承受地面約為 783 公斤的衝擊力。消防人員若能適時於受困者下 方舖設一層柔軟充氣墊或其他替代軟墊,即可延長 落地時的接觸時間,受困者落地之際若能膝蓋多彎 曲一下,或者打滾幾圈亦有相同效果,假設落地接 觸時間能延長為0.5 秒的時間(註:當時落地速度 為每秒15.34 公尺,軟墊或替代方案亦必須有適當 厚度與緩衝支撐之設計),則受力即可減為156.6 公斤。惟本案救援反應時間非常短,且此舉具有不 確定性的危險,消防人員實應本專業知識,發揮緊 急應變智慧。再者,內政部消防署應按我國火警災 害特性、人口分布、救援到達所需交通時間及都市
14 化密集程度,統籌各級消防機關之需求,考量消防 車輛、人員、器材及裝備之配置是否足以撲滅火災 ?而增加消防設備及強化消防人員訓練,以避免人 命傷亡及降低損失。 (五)末查蘆洲大囍市火災後,內政部消防署於92 年9 月17 日函示「因應狹小巷道消防搶救指導計畫」 ,以消防車輛實地走透透之方式劃定搶救困難區域 。且內政部為維持消防車輛救災動線及作業空間需 求,於92 年12 月15 日函頒「劃設消防車輛救災 活動空間指導原則」,其原則係屬行政程序法第6 章所規定之行政指導,尚無法律授權之依據,致無 法強制改善狹小巷道之救災環境,對於狹小巷道內 是否劃設消防通道或禁停紅線,亦致爭議。綜上, 內政部消防署未能嚴格落實消防監督管理工作,對 於尚未成立公寓大廈管理委員會之5 層以下民宅, 亦未能建立使用人自我管理之機制;且消防法尚無 消防車輛通行及救災之法律授權,致內政部函頒「 劃設消防車輛救災活動空間指導原則」之性質止於 行政指導階段,而未具法令效力,亦未能落實消防 工作法治化,明顯難以釐清消防安全之責任,核有 疏失。 綜上所述,新竹縣新埔鎮於102 年1 月15 日發生住 宅火警,新竹縣政府消防局救災救護指揮中心未善盡調 度、聯繫之能事,貽誤緊急救護之先機,且該府辦理轄 內狹小巷道清查不實、違章建築查報作業不力,對於公 共使用通道被佔用之情況竟束手無策,影響建築物防火 及火災救援行動;內政部消防署未能嚴格落實消防監督 管理工作,亦未建立使用人自我管理之機制,且未能落 實消防車輛通行之法治化,均有違失;爰依監察法第24 條提案糾正,移送行政院轉飭所屬確實檢討改善見復。
15
提案委員:趙昌帄、程仁宏
中 華 民 國 1 0 2 年 4 月 1 8 日
FD06153 | 2013_港澳台_香港_立法会_花园街火灾后小贩发牌政策检讨.pdf
分类:06_境外及港澳台调查报告 | 年份:2013 | 地域:香港 | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
立法會 Legislative Council
立法會CB(2)1374/12-13(02)號文件
檔 號:CB2/PL/FE
食物安全及環境衞生事務委員會
立法會秘書處為2013年6月21日特別會議 擬備的背景資料簡介
小販政策
目的
.
本文件綜述食物安全及環境衞生事務委員會(下稱"事務 委員會")委員就小販政策提出的關注。
背景
街頭販賣在香港有悠久歷史。雖然街頭販賣為基層人士 提供就業機會,而且普羅市民亦可買到較廉價的物品,但街頭 販賣亦會引致環境衞生、噪音及阻塞公眾通道等問題。政府當 局表示,其就街頭販賣採用的政策,是妥善規管持牌小販的販 賣活動,並就非法擺賣採取執法行動。前巿政局自1970年代初 起,在一般情況下已不再簽發新的小販牌照,而已簽發的各類 小販牌照的繼承和轉讓亦有嚴格限制,目的是藉自然淘汰逐步 減少小販數目。
2002年的小販自願交回牌照計劃
由於"大牌檔"和流動小販較容易造成環境衞生、噪音滋 擾及公眾通道阻塞等問題,故此,政府當局在2002年推出為期 5年的自願交回小販牌照計劃,鼓勵"大牌檔"持牌人和流動小販 自願交回牌照,換取一筆過的特惠金,或以較優惠的租金經營 公眾街巿/熟食中心的空置檔位,又或轉型為(非熟食類)固定攤 位小販。適用於"大牌檔"的計劃已於2007年11月30日結束,共有 37名"大牌檔"小販自願交回牌照。適用於流動小販的計劃則獲政
2 府當局三度延期至2010年12月31日,原因是政府當局就小販發 牌政策所進行的檢討可能會影響流動小販牌照日後的運作。鑒 於事務委員會對年長的流動小販牌照持有人生計的關注,政府 當局在2010年11月決定將流動小販自願交回牌照計劃下領取特 惠金的方案及優先挑選空置固定攤位的方案作出最後一次延 期,把該兩個方案延長兩年至2012年12月31日,而選租公眾街 市空置檔位的方案則如期於2010年12月31日終止。
2008年的小販發牌政策檢討
因應社會有意見認為小販行業富有傳統特色,因此應予 保留及活化,政府當局於2008年檢討小販發牌政策。在進行檢 討及經諮詢事務委員會、區議會、小販組織及相關持份者後, 政府當局決定在附加條件下,重新簽發有限數目的小販牌照。
2011年及2012年的取消或暫時吊銷小販牌照建議
花園街的排檔分別於2010年12月及2011年11月發生兩 宗嚴重火災,其中第二宗火災造成多人傷亡。在2011年11月的 火警發生後,政府當局已推行一籃子的措施,以改善小販固定 攤檔的管理,目的是減低對鄰近居民構成的火警風險。食物環 境衞生署(下稱"食環署")亦已針對花園街的違規情況及全港所 有其他小販區加強執法。為打擊有檔販屢遭檢控但仍繼續肆意 違規的情況,政府當局亦就取消小販牌照制度的建議於2011年 12月至2012年3月期間進行公眾諮詢。
建議的取消小販牌照制度遭事務委員會、大部分區議會 及小販組織的強烈反對。考慮到所收集的意見,政府當局在 2012年6月修改原先建議的取消小販牌照制度,改為引入新的停 牌制度,懲處一再違規的小販。在建議的停牌制度下,持牌小 販如在3個月內6次違反《小販規例》(第132AI章)有關火警風險 的規定而被定罪,食物環境衞生署署長(下稱"食環署署長")可考 慮暫時吊銷其小販牌照。倘若該持牌小販其後再度在3個月內 6次違反任何相關的小販規例,停牌日數會遞增,以收更大的阻 嚇作用。若持牌人干犯任何嚴重違規事項,包括分租攤檔、非 法駁取電源及為取得牌照而作虛假聲明,食環署署長亦可考慮 立即取消其小販牌照。若有關持牌人不滿食環署署長的決定, 當局亦提供上訴機制。停牌制度已自2012年11月起生效。
3 為固定小販排檔區小販推行的資助計劃
為減低街頭小販擺賣活動在排檔區所構成的火警風 險,政府當局於2012年9月3日宣布將會推行一項為期5年,為在 43個排檔區經營的小販而設的資助計劃(下稱"資助計劃")。資助 計劃旨在為排檔區內的小販提供財政資助,以改善小販攤檔的 防火效能及設計,以及把攤檔遷離大廈樓梯口或緊急車輛通 道。此外,資助計劃亦會為自願交回小販牌照提供一筆過的特 惠金(下稱"自願交回牌照安排"),以幫助加快騰出攤檔空位, 方便遷置有較高火警風險的攤檔。
事務委員會的商議工作
事務委員會曾於2008年至2013年期間的多次會議上討 論與小販政策有關的問題,並在5次會議上聽取團體的意見。 事務委員會曾於2011 年6 月28 日與人力事務委員會舉行聯席 會議,討論在小販政策下創造就業機會的事宜。委員進行的商 議工作和關注事項綜述於下文。
小販政策
委員對於政府當局未有為小販行業的日後發展提供藍 圖表示失望。他們認為,小販行業是香港的街頭文化,而小販 區是草根階層得以謀生及消費者可購買價格相宜貨品的地方。 委員促請政府當局制訂長期的小販政策,以促進小販行業的發 展。亦有委員建議當局應設立小販發展基金,為小販提供協助 及發展小販行業。
政府當局表示,為發展及鼓勵小販行業,除把小販牌照 費訂定於低水平外,政府當局近年已重新簽發流動小販(冰凍甜 點)牌照及新的擦鞋匠小販牌照,以保留特別及具傳統特色的小 販擺賣活動。至於43個小販區及其他地點的日後發展,政府當 局的首要考慮是排檔的消防安全,並會特別注意那些有較高火 警風險的小販區。在中長期而言,視乎是否有可用地方、居民 是否支持及公眾安全的考慮,政府當局會研究有關增加小販牌 照數目及檔位面積的問題。
委員普遍認為,設立露天市集可以促進經濟活動的發展 及在社區創造就業機會。他們促請政府當局將現有的露天市集 (如天水圍的市集)正規化,並成立跨部門的工作小組,負責制訂 全面的長遠小販政策。
4
政府當局表示,對於在各區的適當地點設置露天市集的 構思,當局一直持開放態度。由於街頭擺賣或會引起環境衞生 及其他滋擾問題,政府當局認為有關露天市集的建議應由區內 人士提出,並取得區內居民及相關區議會的普遍支持。如設置 露天市集的倡議者能物色得合適地點,並獲該區支持和符合有 關食物安全及環境衞生的要求,相關決策局及部門(包括食物及 衞生局、食環署及民政事務總署)會樂意提供協助。 重新簽發小販牌照
委員獲告知,如有空置固定小販攤位,登記助手及公眾 人士將有同等申請機會,並以抽籤方式決定選擇攤位位置的先 後次序。政府當局認為,這會確保空置檔位會以公平公開的方 式編配。委員並不接受政府當局的意見。他們認為固定攤位小 販牌照應獲准由登記助手轉讓或繼承;而流動小販牌照的繼承 及轉讓亦應與固定攤位小販牌照一致。事務委員會於2010年1月 12日的會議上通過一項議案,促請政府當局將街上固定檔位空 置位置優先安排予登記助手抽籤。委員其後獲告知,政府當局 計劃讓具從事小販行業經驗的現職登記助手申請優先選擇70% 的空置固定小販攤位。
部分委員建議,當局應考慮對先前用作經營大牌檔的空 置攤位簽發新的固定攤位(熟食或小食)小販牌照及優先向前大 牌檔持牌人或經營者簽發該等牌照。政府當局表示,當局樂於 考慮區議會就重新使用已關閉的大排檔用地提出的建議。不 過,政府當局認為優先向前大牌檔持牌人或經營者簽發小販牌 照,有違公平原則,特別是若他們已根據自願退還牌照計劃退 還牌照,以換取一筆過的特惠金。
在察悉政府當局建議另行簽發30個新的流動小販(冰凍 甜點)牌照後,部分委員促請政府當局進一步增加這類牌照的數 目,因為在惡劣的經濟氣候下,低技術人士難以覓得工作。亦 有委員建議當局應簽發更多新的流動小販(流動車)牌照(俗稱 "雪糕車")。考慮到委員的意見及區議會的支持後,截至2011年 12月31日,政府當局已簽發60個新牌照。不過,委員獲告知, 政府當局並無計劃增發流動小販(流動車)牌照。政府當局認為, 雪糕車往往會停泊在人多車多的地點,而且在營業時長時間開 動引擎,會對空氣質素帶來負面影響。 5 執法行動
部分委員關注到流動小販面對的經營困難,特別是食環 署往往在未有作出通知下轉換小販黑點的地點。這些委員認 為,當局應減少小販黑點的數目,而食環署應考慮到經濟不景, 對小販採取的執法行動較為寬鬆。政府當局表示,一些地點被 視為不適宜進行擺賣活動,而當局在採取檢控行動前不會提出 警告。儘管如此,為加強透明度,政府當局已向區議會提供該 等地點的清單,並自2007年4月起在食環署的辦事處及網站上公 布該等資料。該清單亦提供予小販商會。
委員指出,不同食環署人員的執法準則各有不同,有時 候在同日不同時間也會有所差異,他們對於當局就小販違規活 動的執法標準表示關注。委員認為《小販規例》已過時,擔憂 就執法行動作出的決定通常取決於前線人員的判斷。他們促請 政府當局就《小販規例》,以及食環署人員的執法行動進行檢 討。
政府當局表示,食環署已定期與小販商會溝通,並在其 每天的巡查中告知小販其執法準則。就每個小販區成立的小販 管理諮詢委員會亦會加強食環署人員與攤檔小販之間的溝通。 為回應委員提出的關注,政府當局在2012年3月初致函所有持牌 人,申明食環署的重點檢控事項及闡述對持牌小販攤檔的要求。
委員認同團體的意見,認為小販有需要聘用助手替他們 經營攤檔,特別是年邁的固定攤位小販。政府當局解釋,固定 攤位小販可聘請助手協助他們經營業務。若牌照持有人基於合 理原因而不在場(例如在用膳期間),登記助手便獲准經營該檔 位。若持牌人經常不在場或長期不在檔位,或經常轉換助手, 當局或會懷疑有分租檔位的情況,有關情況屬嚴重的違規事項。
資助計劃
雖然部分委員支持為43個固定小販排檔區的小販在重 建或搬遷攤檔時提供財政資助的資助計劃,但部分其他委員懷 疑當局推出資助計劃的真正動機。他們認為,資助計劃並非純 粹為加強消防安全,而是要減少小販的數目及取締小販行業。
政府當局強調,當局並無任何取締小販行業或減少小販 數目的政策。自願交回牌照安排的目的,是幫助加快騰出攤檔 空位,方便遷置有較高火警風險的攤檔。
6 22. 部分委員認為,除在43個固定小販排檔區經營的持牌小 販外,自願交回牌照安排亦應適用於所有小販。部分其他委員 要求政府當局考慮把特惠金的金額由12萬元提高至20萬元,理 由是小販在向政府交回其小販牌照後,便會永遠喪失生計。
政府當局表示,自願交回牌照安排的目的,是為幫助加 快騰出空間,方便遷置有較高火警風險的攤檔。由於小販街市 的小販檔位或流動小販並無如那些固定攤檔小販般構成同樣的 火警風險,他們並不是自願交回牌照安排的首要涵蓋對象。至 於在不久前才選擇加入小販行業,並在2010年或2011年獲發小 販牌照的141名小販,政府當局認為沒有充分理據容許他們為申 領特惠金而向政府交回牌照。政府當局進而表示,當局已就特 惠金的水平諮詢業界。由於現時的交回牌照安排屬自願性質, 小販可自由選擇是否向政府交回其小販牌照以換取一筆過的 特惠金。 近期發展
財務委員會在2013年3月15日的會議上批准開立一筆為 數2億3,000萬元的新承擔額,用以展開為43個固定小販排檔區的 持牌小販推行為期5年的資助計劃。政府當局表示,資助計劃將 於2013年夏季推出。食環署已就各排檔區的具體搬遷建議開展 地區諮詢,並安排向相關區議會介紹資助計劃的細節。食環署 亦會發信予43個排檔區內的所有持牌小販,告知他們資助計劃 的細節及邀請他們提交申請。 相關文件
立法會網站的相關文件載列於附錄。 立法會秘書處 議會事務部2 2013年6月17日
附錄
小販政策的相關文件 委員會 會議日期 文件 食物安全及環境 衞生事務委員會 2008年12月1日*
CB(2)375/08-09(01)
食物安全及環境 衞生事務委員會 2009年2月10日 (項目IV) 議程 會議紀要 CB(2)1044/08-09(01) CB(2)1044/08-09(02) CB(2)1044/08-09(03)
食物安全及環境 衞生事務委員會 2009年3月10日 (項目VI) 議程 會議紀要 CB(2)1044/08-09(01) CB(2)1044/08-09(02) CB(2)1044/08-09(03)
食物安全及環境 衞生事務委員會 2009年4月14日 (項目VII) 議程 會議紀要 CB(2)686/10-11(01)
食物安全及環境 衞生事務委員會 2009年7月14日 (項目II) 議程 會議紀要
食物安全及環境 衞生事務委員會 2010年1月12日 (項目V) 議程 會議紀要 CB(2)622/09-10(01)
食物安全及環境 衞生事務委員會 2010年11月9日 (項目VI) 議程 會議紀要
食物安全及環境 衞生事務委員會 2010年12月14日 (項目VI) 議程 會議紀要
食物安全及環境 衞生事務委員會 2011年6月28日 (項目II) 議程 會議紀要 CB(2)2434/10-11(01) CB(2)2434/10-11(02)
2 委員會 會議日期 文件 食物安全及環境 衞生事務委員會 2011年12月13日 (項目V) 議程 會議紀要
食物安全及環境 衞生事務委員會 2012年2月14日 (項目IV) 議程 會議紀要
食物安全及環境 衞生事務委員會 2012年4月11日 (項目I) 議程 會議紀要 CB(2)1999/11-12(01)
食物安全及環境 衞生事務委員會 2012年6月12日 (項目V) 議程 會議紀要
食物安全及環境 衞生事務委員會 2013年2月5日 (項目III)
議程
立法會 2013年3月20日
會議過程正式紀錄 (第二十項質詢)
- 發出日期
立法會秘書處 議會事務部2 2013年6月17日
FD06154 | 2015_台湾_八仙乐园粉尘暴燃事件_监察院调查报告.pdf
分类:06_境外及港澳台调查报告 | 年份:2015 | 地域:台湾 | 严重程度: | 场所: | 起火原因:燃气/爆炸 | 来源格式:pdf
八仙樂園塵爆案 ~緣起與發現~ 民國(下同)104 年6 月27 日八仙海岸水上樂園舉辦彩色派對活動 時,發生粉塵爆炸事故,造成15 人死亡、484 人受到程度不等之燒燙傷 案件。經監察院調查發現,交通部觀光局罔顧八仙樂園業者恣意「擴大營 業」至未經核准範圍,怠未依法裁處、未落實觀光遊樂業年度督導考核競 賽及例行檢查工作、未釐訂水域遊樂設施完整配套之安全檢查項目;新北 市政府未善盡職責執行該樂園水域遊樂設施安全之定期檢查工作等。爰經 監察院通過糾正交通部及新北市政府在案。 ~改善與處置結果~ 經監察院追蹤列管後,交通部觀光局業依「發展觀光條例」第55 條及「觀光遊樂業管理規則」相關規定裁處八仙公司違規行為,並修正發 布「觀光遊樂業管理規則」、「觀光遊樂業水域遊樂設施檢查項目及檢查基 準注意事項」及「觀光遊樂業經營管理與安全維護檢查暨督導考核競賽作 業要點」;新北市政府加強轄內觀光遊樂業者定期或不定期之現場檢查、 提高公共意外責任保險、舉辦「觀光遊樂業救難演習」、建立緊急救護及 救難系統,同時全面審視各觀光遊樂業營業範圍、提供傷友長期復健醫 療、疤痕治療服務及居家復健、輔具、環境改造等補助;相關機關並已懲 處失職人員。本案監察院將持續列管追蹤後續辦理情形。
調查案 糾正案
FD06155 | 2015_台湾_桃园中坜工业区敬达工厂火灾_监察院纠正案文.pdf
分类:06_境外及港澳台调查报告 | 年份:2015 | 地域:台湾 | 严重程度: | 场所:厂房/车间 | 起火原因:燃气/爆炸;焊接/动火 | 来源格式:pdf
1 糾 正 案 文
壹、被糾正機關:桃園市政府。 貳、案 由:民國104 年1 月26 日下午桃園市中壢工業 區內工廠發生爆炸起火,桃園市政府所屬 工務局未能切實掌握轄內工業區違章建 築,該府消防局及經濟發展局就該建築物 之消防安全檢查及工廠登記範圍等,均與 實際使用範圍不符,亦未建立橫向聯繫及 跨域管理機制,該府未善盡監督管理之 責,顯有怠失,爰依法提案糾正。 參、事實與理由: 民國(下同)104 年1 月26 日16 時25 分桃園中壢工 業區內敬達企業股份有限公司(下稱敬達公司)烤漆工 廠發生爆炸起火(下稱本案災害),釀成十餘人受傷。 該廠房5、6 樓疑為加蓋違建,屬經濟部工業局列管,惟 違建拆除屬桃園市政府權責範疇,突顯工業區建築管理 嚴重疏漏等情。案經本院於104 年2 月26 日詢問桃園市 政府及經濟部工業局中壢工業區服務中心等相關機關主 管暨承辦人員,復於同年7 月6 日實地履勘敬達公司, 並聽取桃園市政府經濟發展局、都市發展局簡報,茲據 各相關機關提供卷證、簡報、詢答前後說明與回復、以 及桃園市政府函復資料 1,業已調查竣事,茲核有下列失 當之處: 一、桃園市政府負有轄內建築物管理之責,惟該府工務 局未能切實掌握轄內經濟部工業區內之違章建築, 遑論得以依法進行查處作為,核有怠失。 (一)按建築法第1 條及第2 條:「為實施建築管理,以
1 桃園市政府104 年4 月21 日府消救字第1040094847 號函
2 維護公共安全、公共交通、公共衛生及增進市容觀 瞻,特制定本法……」、「主管建築機關,在中央 為內政部;在直轄市為直轄市政府;在縣(市)為縣 (市)政府。」,同法第25 條第1 項規定:「建築物 非經申請直轄市、縣(市)(局)主管建築機關之 審查許可並發給執照,不得擅自建造或使用或拆除 。」同法第77 條規定:「建築物所有權人、使用人 應維護建築物合法使用與其構造及設備安全。直轄 市、縣(市)(局)主管建築機關對於建築物得隨 時派員檢查其有關公共安全與公共衛生之構造與設 備。……。」次按桃園縣政府執行違章建築拆除作 業要點 2第5 點:「為遏止新違章建築產生,興建中 違章建築不論地區、違建規模及使用情形,經勒令 停工不從之違建,應於7 個工作天內拆除(電腦代 號A0)前項興建中違章建築之認定標準,為:(一 )違章建築之結構(含外牆、玻璃門窗、室內樓版 等)未全部完成,或現場尚有工人、機具、施工材 料、廢料等,或工程仍在進行中,或尚未進駐使用 ,足證工程尚未完竣,列入即報即拆。(二)自96 年9 月1 日後核發使用執照之建築物仍二次施工構 成違章建築,經查報後不論是否已興建完工,一律 視同興建中違章建築列入即報即拆。桃園縣政府工 務局違章建築拆除隊查報及認定作業應於三日內完 成。拆除後原址重建者,應依規定移送法辦。」第 6 點規定:「第一階段(近程處理)處理左列危害 公共安全、山坡地水土保持、妨害公共交通、公共 衛生、市容觀瞻之違章建築:……。」第7 點規定 :「第6 點第1 款至第4 款 3其執行方式如左:(一
2 該要點係於101 年12 月20 日修正,且該府於103 年12 月25 日升格直轄市後繼續適用。 3 分別為電腦代號A1:1、經該府公共安全會報決議之拆除專案,或影響山坡地水土保持功
3 )經各目的事業主管機關(單位)認定後,由本府 工務局填發拆除單,於30 個工作天內拆除。(二) 若違章建築規模龐大,需召開勤前會議以維執行安 全者,則工期順延。」 (二)依桃園市政府查復資料,本案災害係位於中壢工業 區內桃園市中壢區北園路36 號建物內敬達公司烤 漆工廠發生爆炸起火,該建物共有6 層樓(鋼骨鐵 皮構造),其中1 至4 樓核有建築執照及使用執照 (84 年5 月10 日核發),且歷年未有違建查報紀錄 。又該府稱該市轄內目前列管違章建築計有 36,000 件以上,其來源多為民眾舉報或各機關稽 查後移送,該府囿於人力編制,無法針對全市違章 建築進行全面清查,對於違規行為重大,且嚴重違 反公共安全者,並經裁處有案之違規行為,若經確 認該行為仍未提出積極改善措施,除依法連續裁處 外,並予以斷水斷電或移送桃園地方法院檢察署偵 辦。據該府統計至104 年2 月26 日止,就該市轄內 經濟部工業局轄管之七大工業區歷年違建查報件數 計有609 件,已拆除結案件數計有138 件。
能涉及公共危險,或經各目的事業主管機關(單位)移送法辦之違章建築。 ,或經各目的事業主管機關(單位)移送法辦之違章建築。2、有礙高速公 路、快速道路、示範道路沿線及交流道口、重要路口公共安全、交通安全及周邊城鄉景觀 之違規廣告物或構造物。3、廣播電台、行動電話基地台之違規天線塔架等雜項構造物。 前揭違章建築認定之權責單位:各目的事業主管機關(單位)。 電腦代號A2:1、擅自佔用河川公地、公有土地,侵害政府合法產權之違章建築。2、擅自 佔用公共設施用地、現有道路、巷道、人行道,影響公共安全、公共通行、城鄉景觀或公 共工程興建之違章建築。前揭違章建築認定之權責單位:設施、道路及土地之管理機關 (單位)。 電腦代號A3:1、在供公眾使用建築物屋頂避難平台、法定空地等擅自搭建,影響共同使 台、法定空地等擅自搭建,影響共同使 用者權益,有礙消防救災及逃生安全之違章建築。2、搭建在防火間隔(巷)之違章建築。 但同一街廓應一併查報,併提審議會議決。前揭違章建築認定之權責單位:1、影響消防 救災:該府消防局。2、影響共同使用者權益:該府工務局(使用管理課)。3、有礙逃生 安全:該府工務局(使用管理課)。 電腦代號A4:1、維護公共安全方案執行建築物公共安全檢查、簽證、申報、抽(複)查 之第一、第二優先順序類組場所之違章建築。2、公眾出入頻繁,嚴重妨礙公共安全或消 防安全場所之違章建築。3、嚴重污染環境之違章工廠(廠房)違章建築。前揭違章建築認 定之權責單位:1、嚴重污染環境:該府環境保護局。2、有礙公共安全:該府工務局(使
4 (三)惟查,依桃園縣消防局第2 大隊內壢分隊,於93 年5 月17 日針對該場所之消防安全檢查紀錄表,其 中建築物樓層數即已載明地上6 層、地下1 層;再 查桃園市政府地方稅務局房屋稅籍證明書中登載資 料,該建物第5、6 樓之房屋稅起課年月早於84 年 9 月即進行課徵。依上述資料可證,該建物第5、6 樓屬於違建之事證明確,且以樓層外觀判定亦極易 判定,然以該違建(中壢區北園路36 號)存在迄今已近 20 年之久,並依桃園市政府接受本院詢問前提供 之卷證及簡報資料所載,竟均未有違建查報紀錄; 又該府於接受本院詢問時自承:「各縣市有訂定其 違建處理的優先順序,而非僅針對工業區。經濟部 在工業區有服務中心,大概都是尊重工業區的管理 ,除非出事通常很少去提報。本案件後管理中心大 部分針對公共設施,縣市政府一般比較少去工業區 。」益證該府就工業區內之違建查報作為消極被動 ,亦未依建築法第77 條「得隨時派員檢查」規定辦 理,甚且該府其他相關局處早已存有相關資料可供 勾稽比對,故該府既未能就轄內工業區實質違建情 形加以掌握,則其後續違建查處或限期改善等作為 則付之闕如,有悖建築法第1 條所揭示實施建築管 理以維護公共安全之立法意旨。 (四)再以,該府遲至災害發生後,其所屬工務局方於 104 年3 月18 日桃工拆字第1040021355 號函示, 就轄內影響公共安全的既存違章建築執行清查,涉 及下列情形者:違反土地使用分區者、違章建築且 有違規使用情形者、大面積違建且作營業使用者、 有重大影響公共安全之虞者、經認定重大影響公安
用管理課)。3、有礙消防安全:(該府消防局)。
5 、交通、水土保持或嚴重污染之既成違建、涉及拆 後重建不法情事者,並影響公共安全之違章建築案 件事證明確者,辦理公告、上網公布並執行強制拆 除等作為。然進一步檢視該府提供之違章建築資料 清冊,顯示工業區內違建中不乏有應即報即拆(即 電腦代碼A0)或應於第1 階段(即電腦代碼A1~A4 )近程處理之違章建築,但卻未予執行拆除作為, 顯與該府執行違章建築拆除作業要點之規定不符。 (五)綜上,桃園市政府負有轄內建築物負有建築管理之 責,建築物的公共安全檢查及維護係為保障人民及 勞工生命與人身安全之基本生存權利,違章建築中 涉有重大公共安全者亦應優先處理,藉以督促建築 物所有權人、使用人應依法維護其建築物之合法使 用,惟該府工務局未能切實掌握轄內經濟部工業區 內之建築違章建築,遑論得以依法進行查處作為, 該局執行作為顯欠積極亦未符合該府所訂定之違章 建築拆除作業要點,長久以來容任類此違建猶如不 定時炸彈潛藏於周遭環境,衍生公共安全之危害風 隩,核有怠失。 二、桃園市政府消防局對本案敬達公司實施消防安全檢 查紀錄,其建築物樓層數記載內容不一,又該府經 濟發展局主管工廠登記,其列管該公司工廠登記範 圍與實際使用範圍竟不相符,顯見該府各機關對建 物內各工廠使用樓層,未建立橫向聯繫及跨域管理 機制,突顯該府各主管機關未詳實掌握工廠實際使 用範圍,消防安全檢查及工廠登記流於形式,致生 安全管理漏洞,顯有怠失。 (一)依消防法第1 條及第6 條分別規定:「為預防火災 、搶救災害及緊急救護,以維護公共安全,確保人 民生命財產,特制定本法。」、「本法所定各類場
6 所之管理權人對其實際支配管理之場所,應設置並 維護其消防安全設備;……。消防機關得依前項所 定各類場所之危隩程度,分類列管檢查及複查。」 消防機關辦理消防安全檢查注意事項第5 點規定: 「執行消防安全檢查注意事項︰(一)檢查前: ……(2)準備受檢場所基本資料、歷次檢查紀錄及 檢修申報書等資料。……。」次依工廠管理輔導法 第4 條規定由直轄市、縣(市)主管機關辦理工廠 設立許可、登記及其撤銷、廢止,暨相關管理、輔 導及處分之責。 (二)據桃園市政府就消防安檢查處情形,敬達公司領有 建築物使用執照,其用途為廠房,該府消防局於 93 年5 月17 日至103 年2 月21 日針對該公司實施 消防安全檢查共計16 次,其中不符規定限期改善 紀錄共5 次,包括舉發紀錄1 次(94 年4 月21 日消防安 全設備不合規定:火警自動警報設備、室內消防栓設備等故障) ,103 年2 月21 日檢查結果註記為合格。 (三)惟查敬達公司工廠登記資料顯示,於95 年3 月31 日變更廠地廠房,其工廠登記中廠址為桃園縣中壢 市北園路36 號1、2、3 樓,然該府檢附其所屬消防 局第2 大隊內壢分隊之消防安全檢查紀錄表,自96 年2 月16 日起至104 年1 月7 日間計進行12 次安 全檢查紀錄,其中建築物樓層數分別記載有「地上 3 層、地下1 層」(96 年2 月6 日紀錄表)、「地上4 層 、地下1 層」(100 年12 月29 日紀錄表)、「地上4 層 」(其他各次紀錄表),顯然未詳實確認受檢場所之基 本資料及歷次檢查紀錄,又何以確實實施消防安全 檢查紀錄。 (四)再查,敬達公司工廠廠址登載為1 至3 樓,並曾於 102 年11 月22 日變更負責人,欣新開發有限公司( 下稱欣新公司)中壢廠則於95 年8 月23 日核准登記
7 為該建物4 樓,然依桃園市政府消防局「火災原因 調查鑑定書」載明,1 至3 樓為敬達公司、4 至5 樓為欣新公司,敬達公司於4 樓設有1 組隧道式烤 箱,6 樓供住宅使用。足證本案火災事故發生時, 其建物內各公司工廠實際使用樓層數與工廠登載資 料未符,且該府自95 年核發該建物1 至4 樓相關工 廠登記迄今,竟均未發現工廠登記內容與其實際使 用範圍不符,實有怠失。 (五)綜上,桃園市政府消防局對本案敬達公司實施消防 安全檢查紀錄,其建築物樓層數記載內容不一,又 該府經濟發展局主管工廠登記,其列管該公司工廠 登記範圍與實際使用範圍竟不相符,顯見該府各機 關對建物內各工廠使用樓層,未建立橫向聯繫及跨 域管理機制;工業區設置目的為集中設廠,促使工 業安全及環境污染集中管理,以提升產業競爭力, 然該府相關主管機關未詳實掌握工廠實際使用範圍 ,突顯該府就工業區內工廠之消防安全檢查及工廠 登記流於形式,致生安全管理漏洞,顯有怠失。
8 據上論結,桃園市政府所屬工務局未能切實掌握轄 內工業區違章建築,所屬消防局及經濟發展局就該建築 物之消防安全檢查及工廠登記範圍等,均與實際使用範 圍不符,亦未建立橫向聯繫及跨域管理機制,該府未善 盡監督管理之責,顯有怠失,爰均依監察法第24 條提案 糾正,移送行政院轉飭所屬確實檢討改善並依法妥處見 復。
提案委員:仉桂美、王美玉
中華民國 1 0 4 年 7 月 日
FD06156 | 2015_台湾_桃园新屋保龄球馆火灾_监察院纠正案文.pdf
分类:06_境外及港澳台调查报告 | 年份:2015 | 地域:台湾 | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
監察院公報【第3058 期】 i ************** 目 次 ************** 糾 正 案 一、本院內政及少數民族委員會為桃園 市政府長期放任轄內新屋區亞洲保 齡球館於農地之大型違建存在,另 救火指揮官對火場狀況掌握不足、 未依規定落實火場人員管制,疏於 注意無線電通訊阻礙,未確認鐵皮 屋內訊號狀況,致室內人員無法及 時收到撤退命令,終致釀成6 名消 防人員同時殉職,確有違失,爰依 法糾正案 ················································· 1 會議紀錄 一、本院司法及獄政委員會第5 屆第38 次會議紀錄 ··········································· 58 二、本院司法及獄政、內政及少數民族 委員會第5 屆第36 次聯席會議紀 錄 ·························································· 61 三、本院司法及獄政、內政及少數民族 、國防及情報委員會第5 屆第6 次 聯席會議紀錄 ······································· 62 四、本院司法及獄政、財政及經濟、教 育及文化委員會第5 屆第24 次聯 席會議紀錄 ·········································· 62 工作報導 一、106 年1 月至9 月份監察權行使情 形統計表 ·············································· 63 二、106 年9 月份糾正案件一覽表 ············ 64 三、106 年9 月份彈劾案件一覽表 ············ 67
監察院公報【第3058 期】 ‧1‧ ***************** 糾 正 案 ***************** 一、本院內政及少數民族委員會為桃 園市政府長期放任轄內新屋區亞 洲保齡球館於農地之大型違建存 在,另救火指揮官對火場狀況掌 握不足、未依規定落實火場人員 管制,疏於注意無線電通訊阻礙 ,未確認鐵皮屋內訊號狀況,致 室內人員無法及時收到撤退命令 ,終致釀成6 名消防人員同時殉 職,確有違失,爰依法糾正案 監察院 公告 發文日期:中華民國106 年10 月6 日 發文字號:院台內字第1061930720 號 主旨:公告糾正桃園市政府長期放任轄內新 屋區亞洲保齡球館於農地之大型違建 存在,另救火指揮官對火場狀況掌握 不足、未依規定落實火場人員管制, 疏於注意無線電通訊阻礙,未確認鐵 皮屋內訊號狀況,致室內人員無法及 時收到撤退命令,終致釀成6 名消防 人員同時殉職,確有違失案。 依據:106 年10 月5 日本院內政及少數民 族委員會第5 屆第39 次會議決議及 監察法施行細則第22 條規定。 公告事項:糾正案文1 份。 院 長 張博雅 公差 副院長 孫大川 代行 糾正案文 壹、被糾正機關:桃園市政府。 貳、案由:桃園市政府長期放任轄內新屋區 亞洲保齡球館於農地之大型違建存在, 自民國(下同)83 年起至104 年1 月 20 日發生大火止仍未積極處置,該府 違法核發使用執照,歷來對該違建查報 不實、未切實追蹤列管,對其違建未依 法拆除,且未確實裁罰並要求停止使用 ,甚至於103 年間查報本案違建類別登 載有誤時卻違法更改其類別,致拆除順 序延後而未能執行,以及該府明知對農 地所存在大型違建無法輔導合法化,卻 仍執意辦理;再者,該違建消防安全設 備檢修一再不合格,消防局卻未複查必 要項目並促其改善,因而所設消防安全 設備未能發揮作用,且救火指揮官對火 場狀況掌握不足、未依規定落實火場人 員管制,疏於注意無線電通訊阻礙,未 確認鐵皮屋內訊號狀況,致室內人員無 法及時收到撤退命令,終致本件火災釀 成6 名消防人員同時殉職,該府所屬各 機關顯未善盡其職,確有違失,爰依法 提案糾正。 參、事實與理由: 桃園市新屋區亞洲保齡球館於104 年1 月20 日凌晨2 時許發生火警,消防局 動員大批人力搶救,6 名年輕消防隊員 卻不幸殉職。案經迭次調卷、函詢、履 勘、訪查、影像辨識、消防車實地演練 、受理陳情及訪談、詢問相關主管機關 人員等調查發現,本案大型違建存在於 農地20 年間,桃園市政府違法核發使 用執照,歷來對該違建查報不實、未切 實追蹤列管,對其違建未依法拆除,且 未確實裁罰並要求停止使用;再者,該
監察院公報【第3058 期】 ‧2‧ 違建消防安全設備檢修一再不合格,消 防局卻未複查必要項目並促其改善,因 而所設消防安全設備未能發揮作用,且 救火指揮官對火場狀況掌握不足、未依 規定落實火場人員管制,疏於注意無線 電通訊阻礙,未確認鐵皮屋內信號狀況 ,致室內人員無法及時收到撤退命令, 終致本件火災釀成6 名消防人員同時殉 職,經核,該府所屬各機關未善盡其職 ,難辭監督不周之責,應予糾正。茲臚 列事實及理由如下: 一、發生本件火災之本案建物核准面積僅 819.47 平方公尺,完成之建物面積竟 高達5,338.37 平方公尺。桃園市政府 之前身為桃園縣政府工務局於83 年 10 月19 日核發本案建物之使用執照 時,即知本案建物尚有未完成建物存 在,且該府核發使用執照不到2 個月 ,其稅務局即自83 年12 月起課本案 建物面積5,188 平方公尺之房屋稅。 本案建物之核准面積部分係與違建部 分同時建造,成為一個不可分割之建 物,且違建面積高達84.65%,合法 面積僅15.35%,違建部分坐落於農 業區,用目測即知本案建物之主要構 造與設計圖樣顯不相符,依法不得核 發使用執照,該府工務局竟違法核發 使用執照,核有重大違失。 (一)92 年6 月5 日修正前之建築法第 11 條第1 項前段規定:「本法所稱 建築基地,為供建築物本身所占之 地面及其所應留設之法定空地。」 60 年12 月22 日修正之建築法第 26 條第1 項規定:「直轄市、縣 (市)(局)主管建築機關依本法 規定核發之執照,僅為對申請建造 、使用或拆除之許可。」73 年11 月7 日修正之建築法第70 條第1 項本文規定:「建築工程完竣後, 應由起造人會同承造人及監造人申 請使用執照。直轄市、縣(市)( 局)主管建築機關應自接到申請之 日起,10 日內派員查驗完竣。其主 要構造、室內隔間及建築物主要設 備等與設計圖樣相符者,發給使用 執照,並得核發謄本;不相符者, 一次通知其修改後,再報請查驗。 」65 年1 月8 日修正之建築法第 71 條規定:「申請使用執照,應 備具申請書,並檢附左列各件:一 、原領之建造執照或雜項執照。二 、建築物竣工平面圖及立面圖(第 1 項)。建築物與核定工程圖樣完 全相符者,免附竣工平面圖及立面 圖(第2 項)。」 (二)經查本案保齡球館所在之建築物( 下稱本案建物),於96 年1 月25 日門牌改編為新屋鄉中興北路101 號,係坐落桃園市新屋區中正段 434~439、442 地號土地,位於「 新屋都市計畫」內,部分為住宅區 、部分為農業區,如下圖都市計畫 圖所示(略):
監察院公報【第3058 期】 ‧3‧ 本案原申請核准用途與自行違建面積統計: 原核准圖說 自行違建面積 使用分區 位於住宅區 含跨農業區+住宅區 用途 第一層自用游泳池 第二層住宅 第一層游泳池(營業用) 第二層保齡球館 面積 第一層439.82 m² 第二層379.65 m² 合計:819.47 m² 第一層2,317.9 m² 第二層2,201.0 m² 合計:4,518.9 m² 合計使用面積 第一層:439.82+2,317.9=2,757.72 m² 第二層:379.65+2,201.0=2,580.65 m² 合計:819.47(15.35%)+4,518.9(84.65%)=5,338.37m²(100%) 備註:資料來源:桃園市政府。現況面積資料來源為地方稅務局房屋稅籍證明書,登載自83 年12 月起新屋鄉中正段437 地號(農業區)、執照號碼(83)桃縣工建使字第01392 號。
(三)有關本案建物之建造執照與使用執 照情形,桃園縣政府工務局於83 年8 月10 日核發(83)桃縣工建 執照字第0940 號建造執照(坐落 新屋鄉中正段435、436、437 地號 )。起造人黃明珠,經所有權人黃 彭菊英同意,於同年8 月31 日申 請使用執照(地址:新屋鄉新生村 中正路110 巷95 弄24 之3 號;地 號:新屋鄉中正段435、436、437 號)。縣府工務局於83 年10 月19 日核發(83)桃縣工建使字第01392 號使用執照(地號:新屋鄉中正段 435、436、437 號),執照並註記 :第一層用途為自用游泳池,不得 對外營業(合法面積為439.82 平方 公尺),第二層為住宅(合法面積 為379.65 平方公尺)。該使用執照 卷附照片顯示,該案之建築基地外 有未完成之建築物存在,再依據該 府稅務局房屋稅籍證明書所載,起 課日期由83 年12 月起課,面積計 5,188 平方公尺,顯見該已完成及 未完成之建物係同時建造。 (四)詢據桃園市政府104 年2 月26 日 府消救字第1040037301 號函復本 院說明稱:該農地違建因非屬該次 使用執照之申請之基地範圍內,依 法尚無涉及該使用執照之核發,申 請人針對申請地請領使用執照,相 關建築法規尚無因鄰地(地號:新 屋區中正段434、437、438、442 號等4 筆地號)存有違建而拒絕核 發建築執照之規定,且該違建坐落 於申請基地範圍外,各相關法令亦 無類似得以鄰地(非屬申請範圍) 違規(建)而限制土地申請建築執 照之連結云云。 (五)惟查,該違築物核准面積僅819.47 平方公尺(第一層439.82m²+第二
監察院公報【第3058 期】 ‧4‧ 層379.65m²),但完成之建物面積 竟高達5,338.37 平方公尺(第一層 2,757.72m²+第二層2,580.65m²) 。再者,桃園縣政府於83 年10 月 19 日核發本案建物之使用執照時 ,本案建物即有未完成建物存在, 且該府核發使用執照不到2 個月, 其稅務局即自83 年12 月起課本案 建物面積5,188 平方公尺之房屋稅 。因此,本案建物之核准部分係與 違建部分同時建造,成為一個不可 分割之建物,且違建面積高達 84.65%,合法面積僅15.35%,違 建部分坐落於農業區,用目測即知 本案建物之主要構造與設計圖樣顯 不相符,依法不得核發使用執照, 該府工務局竟違法核發使用執照, 核有重大違失。 二、桃園縣新屋鄉公所承辦徐慧玲於99 年8 月5 日明知設於本案建物內之「 佳宜音樂餐坊」違物面積4,518 平方 公尺,卻僅向縣府城鄉發展處陳報位 於住宅區之面積132 平方公尺,顯有 違誤。桃園縣政府城鄉發展處於99 年9 月15 日以違反都市計畫法裁處 「佳宜音樂餐坊」罰鍰6 萬元,命立 即停止非法使用及1 個月內恢復原狀 ,並副知新屋鄉公所請其持續追蹤複 查土地使用改善情形,該公所承辦張 孆升及其課長黃仁勳於簽呈「持續追 蹤管理」後,卻未切實追蹤列管,該 處承辦陳志明、科長莊敬權及處長李 永展未切實督導,亦有疏失。 (一)91 年12 月11 日修正之都市計畫 法第79 條規定第1 項:「都市計 畫範圍內土地或建築物之使用,或 從事建造、採取土石、變更地形, 違反本法或內政部、直轄市、縣( 市)(局)政府依本法所發布之命 令者,當地地方政府或鄉、鎮、縣 轄市公所得處其土地或建築物所有 權人、使用人或管理人新臺幣6 萬 元以上30 萬元以下罰鍰,並勒令 拆除、改建、停止使用或恢復原狀 。不拆除、改建、停止使用或恢復 原狀者,得按次處罰,並停止供水 、供電、封閉、強制拆除或採取其 他恢復原狀之措施,其費用由土地 或建築物所有權人、使用人或管理 人負擔。」89 年1 月26 日修正之 同法第80 條規定:「不遵前條規 定拆除、改建、停止使用或恢復原 狀者,除應依法予以行政強制執行 外,並得處6 個月以下有期徒刑或 拘役。」101 年11 月12 日修正前 之都市計畫法臺灣省施行細則第29 條第1 項本文規定:「農業區為保 持農業生產而劃定,除保持農業生 產外,僅得申請興建農舍、農業產 銷必要設施或休閒農業設施。」 105 年4 月25 日修正前之該條項 本文規定:「農業區為保持農業生 產而劃定,除保持農業生產外,僅 得申請興建農舍、農業產銷必要設 施、休閒農業設施及農村再生相關 公共設施。」105 年4 月25 日修正 之該條項本文規定:「農業區為保 持農業生產而劃定,除保持農業生 產外,僅得申請興建農舍、農業產 銷必要設施、休閒農業設施、自然 保育設施、綠能設施及農村再生相 關公共設施。」99 年2 月1 日修
監察院公報【第3058 期】 ‧5‧ 正前該細則第15 條第1 項規定: 「住宅區為保護居住環境而劃定, 不得為下列建築物及土地之使用: ……十、……視聽歌唱場、遊藝場 、歌廳、保齡球館……。十一、舞 廳(場)、酒家、酒吧(廊)…… 或其他類似之營業場所。……二十 二、其他經縣(市)政府認為足以 發生噪音、振動、特殊氣味、污染 或有礙居住安寧、公共安全或衛生 並公告限制之建築物或土地之使用 」。101 年11 月12 日修正前之該 條項規定:「住宅區為保護居住環 境而劃定,不得為下列建築物及土 地之使用:……十……歌廳、保齡 球館……。十一、舞廳(場)、酒 家、酒吧(廊)……或其他類似之 營業場所。……二十三、其他經縣 (市)政府認為足以發生噪音、振 動、特殊氣味、污染或有礙居住安 寧、公共安全或衛生並公告限制之 建築物或土地之使用。」105 年4 月25 日修正前之該條項規定:「 住宅區為保護居住環境而劃定,不 得為下列建築物及土地之使用:… …十……歌廳、保齡球館……。十 一、舞廳(場)、酒家、酒吧(廊 )……或其他類似之營業場所。… …二十三、其他經縣(市)政府認 定足以發生噪音、振動、特殊氣味 、污染或有礙居住安寧、公共安全 或衛生,並依法律或自治條例限制 之建築物或土地之使用。」農業發 展條例第69 條第1 項規定:「農 業用地違反區域計畫法或都市計畫 法土地使用管制規定者,應依區域 計畫法或都市計畫法規定處理」。 準此,農業區不得違反農業生產使 用,住宅區不得為保齡球館、視聽 歌唱場等類似營業場所之使用,違 反規定者依都市計畫法第79、80 條規定處分。 (二)本案違反都市計畫法及都市計畫法 臺灣省施行細則規定,新屋鄉公所 人員查核不實,違失如下: 1.新屋鄉公所承辦徐慧玲於99 年8 月5 日明知設於本案建物內之「 佳宜音樂餐坊」,違建面積合計 達5,338.37 平方公尺,卻僅向縣 府城鄉發展處陳報本案建物位於 住宅區之面積132 平方公尺,顯 有違誤。 (1)99 年7 月16 日桃園縣政府警 察局楊梅分局查報新屋鄉中興 北路101 號2 樓「佳宜音樂餐 坊」未辦理營業登記且違規經 營視聽歌唱業情形,函請該府 工商發展處、地政處、工務處 、財政部臺灣省北區國稅局楊 梅稽徵所依權責裁處。該府地 政處承辦李校琛於99 年7 月 21 日函轉主管機關城鄉發展處 核處,說明中興北路101 號經 營「佳宜音樂餐坊」案內土地 屬於都市計畫範圍內土地,請 本於權責核處。99 年7 月26 日城鄉發展處承辦林國強以府 城行字第0990286615 號函請 新屋鄉公所協助查報,99 年8 月5 日新屋鄉公所承辦徐慧玲 函(註1)復城鄉發展處稱: 本案違反都市計畫住宅區土地
監察院公報【第3058 期】 ‧6‧ 使用分區管制等規定(土地坐 落新屋區中正段地號436、439 ,面積132 平方公尺)等語。 然查本案建物面積達5,338.37 平方公尺,其中違建部分高達 84.65%,該函所附之照片卻僅 拍保齡球館門口,徐慧玲竟僅 查報「佳宜音樂餐坊」之住宅 區地號436、439 地號面積132 平方公尺,忽視建築整體性, 對於農業區大型違建面積達 4,518 餘平方公尺隻字不提。 (2)徐慧玲於本院詢問坦承:當時 收到公文就過去現場看過,我 去查報時是針對違規使用面積 ,是報給縣府違規使用面積等 語。該公所顯查報不實,僅看 住宅區違規使用面積132 平方 公尺,未能切實查核違建範圍 ,顯有違失。 2.城鄉發展處於99 年9 月15 日以 違反都市計畫法裁處「佳宜音樂 餐坊」罰鍰6 萬元,命立即停止 非法使用及1 個月內恢復原狀, 並副知新屋鄉公所請其持續追蹤 複查土地使用改善情形,該公所 承辦張孆升及其課長黃仁勳於簽 呈「持續追蹤管理」後,卻未切 實追蹤列管,該處承辦陳志明、 科長莊敬權(註2)及處長李永 展(註3)未切實督導,亦有疏 失。 (1)99 年8 月12 日城鄉發展處承 辦陳志明以府城行字第09903 04094 號函,請「佳宜音樂餐 坊」負責人葉桂英對於違反土 地使用分區,於文到10 日內 陳述意見,請立即停止非法使 用。99 年9 月15 日陳志明認 定「佳宜音樂餐坊」違反都市 計畫法臺灣省施行細則第15 條 規定,依都市計畫法第79 條, 處罰鍰6 萬元,立即停止非法 使用,以及1 個月內恢復原狀 ,並副知新屋鄉公所、楊梅分 局持續追蹤複查土地使用改善 情形(該府99 年9 月15 日府 城行字第0990363934 號裁處 書;後於99 年10 月11 日全 數繳納)。 (2)桃園縣都市計畫土地違規使用 裁罰流程明載:「備註:鄉鎮 公所列管事項:1.查察違規案 件是否於該府規定期限內拆除 、改建、停止使用或恢復原狀 。2.屆期未恢復原狀案件,由 公所查報該府城鄉發展處開立 第二階段處分書並移請該府工 務處執行斷水斷電。」新屋鄉 公所於收受上開副本後,簽擬 「持續追蹤管理」(承辦人書 記張孆升、城鄉課代理課長黃 仁勳決行),惟後續竟未依法 切實追蹤列管,勒令停止使用 及1 個月內恢復原狀,顯有違 誤。 (3)據此,本院詢問時,新屋鄉公 所承辦人稱:徐慧玲受官等訓 練5 週,暫接其工作一個月, 後來於10 月初回臺北待產,對 此業務只是接公文及問別人, 該工作與原任職戶政工作不相
監察院公報【第3058 期】 ‧7‧ 關,故不熟悉。因快生了,所 以沒有去現場;當時公文是副 本,故為存查。公所是提供協 助,當時接任該業務,還在學 習中,又育嬰假約一年半後調 職,故無印象等語,該公所承 辦課長黃仁勳稱:前面公文只 是協助辦理而已,沒有去過現 場,都由承辦人員徐慧玲去等 語。 (4)有關縣府城鄉處是否落實追蹤 督導乙節,詢據縣府城鄉處承 辦陳志明稱:都是副知查報單 位等語。縣府時任科長莊敬權 稱:我是當時科長,裁罰為上 一層決行,幾乎都是處長(李 永展)決行,如請假才由副處 長。後續是否停止使用,這部 分委由公所協助,沒有督導公 所是我們的錯等語。時任處長 李永展稱:作法是有人檢舉時 ,會去看再去開罰,但人力不 足,會由公所或警察局追蹤, 公所或警察局沒有回報。裁罰 書正本是給土地所有權人,要 求依都市計畫法規定辦理,如 持續檢舉可以再罰。沒有一件 是去繼續裁罰的,96-100 年 間是否只有處分一次,本案沒 有主動去瞭解有無恢復原狀, 受限於人力不足。科長會報告 裁罰案件數,但我們人力光是 處理違規事實案件數就難以負 荷等語。城鄉發展局局長吳啟 民稱:未處罰部分是因為人力 不足,故無法主動去稽查或複 查等語。莊敬權及李永展於本 院詢問時均坦承沒有督導公所 是我們的錯等語。 (5)承辦張纓升及課長黃仁勳均坦 承,本案新屋鄉公所未依法切 實追蹤列管本案建物,未依法 勒令停止使用及1 個月內恢復 原狀,其辦理過程顯有違誤。 依98 年之分層負責明細表, 縣府城鄉發展處關於違反土地 使用分區之業務,應由處長核 定,時任該處承辦陳志明、科 長莊敬權(註4)及處長李永 展(註5)皆未切實執行追蹤 督導,致錯失即時遏止之契機 ,均有疏失。 三、桃園縣政府城鄉發展局於102 年間依 新屋鄉公所函復及農業發展局之查復 函文,明知劉得斌於都市計畫住宅區 及農業區違規興建本案建物,違法做 為保齡球館、電動玩具店使用,違反 土地使用管制規定之事實後,於102 年8 月29 日函請行為人說明,該行 為人未如期陳述,該局竟未依都市計 畫法第79 條規定裁罰,並勒令拆除 、改建、停止使用或恢復原狀。嗣該 局於103 年8 月15 日收受農業發展 局函文請其對違反農業使用依權責核 處後,竟於同月21 日發文請農業發 展局依權責輔導合法使用。農業發展 局於103 年12 月2 日因現勘後仍未 改善再函請城鄉發展局對違反農業使 用請依法核處後,城鄉發展局於103 年12 月19 日函請行為人陳述意見, 違規人未如期陳述意見後,該局竟仍 未依都市計畫法第79 條規定裁罰,
監察院公報【第3058 期】 ‧8‧ 並勒令拆除、改建、停止使用或恢復 原狀。該局遲至104 年1 月20 日本 案建物於凌晨2 點大火,造成6 名消 防隊員死亡後,始於104 年1 月20 日裁罰7 萬元,該局長期放任業者違 反都市計畫法於農業區及住宅區內經 營保齡球館,致釀災害慘劇,洵有違 失。承辦林國強懈怠職務,縱容包庇 ,核有重大違失;科長莊敬權在公文 核章,怠忽職守,有嚴重違失;局長 吳啟民、核定決行技正宋仲浩均未盡 督導之責,亦有違失。 (一)如前所述,91 年12 月11 日修正 之都市計畫法第79 條規定第1 項 :「都市計畫範圍內土地或建築物 之使用,或從事建造、採取土石、 變更地形,違反本法或內政部、直 轄市、縣(市)(局)政府依本法 所發布之命令者,當地地方政府或 鄉、鎮、縣轄市公所得處其土地或 建築物所有權人、使用人或管理人 新臺幣6 萬元以上30 萬元以下罰 鍰,並勒令拆除、改建、停止使用 或恢復原狀。不拆除、改建、停止 使用或恢復原狀者,得按次處罰, 並停止供水、供電、封閉、強制拆 除或採取其他恢復原狀之措施,其 費用由土地或建築物所有權人、使 用人或管理人負擔。」89 年1 月 26 日修正之同法第80 條規定:「 不遵前條規定拆除、改建、停止使 用或恢復原狀者,除應依法予以行 政強制執行外,並得處6 個月以下 有期徒刑或拘役。」101 年11 月 12 日修正前之都市計畫法臺灣省 施行細則第29 條第1 項本文規定 :「農業區為保持農業生產而劃定 ,除保持農業生產外,僅得申請興 建農舍、農業產銷必要設施或休閒 農業設施。」105 年4 月25 日修 正前之該條項本文規定:「農業區 為保持農業生產而劃定,除保持農 業生產外,僅得申請興建農舍、農 業產銷必要設施、休閒農業設施及 農村再生相關公共設施。」105 年 4 月25 日修正之該條項本文規定 :「農業區為保持農業生產而劃定 ,除保持農業生產外,僅得申請興 建農舍、農業產銷必要設施、休閒 農業設施、自然保育設施、綠能設 施及農村再生相關公共設施。」99 年2 月1 日修正前該細則第15 條 第1 項規定:「住宅區為保護居住 環境而劃定,不得為下列建築物及 土地之使用:……十、……視聽歌 唱場、遊藝場、歌廳、保齡球館… …。十一、舞廳(場)、酒家、酒 吧(廊)……或其他類似之營業場 所。……二十二、其他經縣(市) 政府認為足以發生噪音、振動、特 殊氣味、污染或有礙居住安寧、公 共安全或衛生並公告限制之建築物 或土地之使用」。101 年11 月12 日修正前之該條項規定:「住宅區 為保護居住環境而劃定,不得為下 列建築物及土地之使用:……十… …歌廳、保齡球館……。十一、舞 廳(場)、酒家、酒吧(廊)…… 或其他類似之營業場所。……二十 三、其他經縣(市)政府認為足以 發生噪音、振動、特殊氣味、污染 或有礙居住安寧、公共安全或衛生
監察院公報【第3058 期】 ‧9‧ 並公告限制之建築物或土地之使用 。」105 年4 月25 日修正前之該 條項規定:「住宅區為保護居住環 境而劃定,不得為下列建築物及土 地之使用:……十……歌廳、保齡 球館……。十一、舞廳(場)、酒 家、酒吧(廊)……或其他類似之 營業場所。……二十三、其他經縣 (市)政府認定足以發生噪音、振 動、特殊氣味、污染或有礙居住安 寧、公共安全或衛生並公告限制之 建築物或土地之使用。」105 年4 月25 日修正前之該條項規定:「 住宅區為保護居住環境而畫定,不 得為下列建築物及土地之使用:… …十……歌廳、保齡球館……。十 一、舞廳(場)、酒家、酒吧(廊 )……或其他類似之營業場所。… …二十三、其他經縣(市)政府認 定足以發生噪音、振動、特殊氣味 、污染或有礙居住安寧、公共安全 或衛生,並依法律或自治條例限制 之建築物或土地之使用。」農業發 展條例第69 條第1 項規定:「農 業用地違反區域計畫法或都市計畫 法土地使用管制規定者,應依區域 計畫法或都市計畫法規定處理」。 準此,農業區不得違反農業生產使 用,住宅區不得為保齡球館、視聽 歌唱場等類似營業場所之使用,違 反規定者依都市計畫法第79、80 條規定處分。 (二)城鄉發展局於102 年間依新屋鄉公 所函復及農業發展之查復函文,知 悉「新屋保齡球館」所在之建物坐 落農業區及住宅區,違反土地使用 管制規定後,於102 年8 月29 日 函請行為人說明,該行為人未如期 陳述,該局竟未依都市計畫法第79 條規定裁罰,並勒令拆除、改建、 停止使用或恢復原狀,承辦林國強 、科長莊敬權、核定決行技正宋仲 浩均怠忽職權,顯有違失。該局長 吳啟民綜理局務,未切實督導,亦 有疏失。 1.102 年8 月5 日縣府工商發展局 (承辦:楊欣怡)依據財政部北 區國稅局102 年7 月31 日函, 函(註6)請新屋保齡球館負責 人因未依法申辦商業設立登記即 經營「電動玩具店」,請於15 日 內辦理商業登記,並副知該府城 鄉發展局等機關(警察、衛生、 環保、地政、社會、該局工商輔 導科)。城鄉發展局於102 年8 月7 日以桃城行字第1020014356 號函請新屋鄉公所查報「新屋保 齡球館」有無違反土地使用分區 管制規定情事,102 年8 月13 日 新屋鄉公所(承辦:黃麗月)以 桃新鄉城字第1020017937 號函 復城鄉發展局,說明該址中興北 路101 號2F 坐落農業區及住宅 區,疑似違反土地使用管制規定 。102 年8 月20 日城鄉發展局 (承辦林國強;後由科長決行) 府城行字第1020207428 號函請 農業發展局針對前開農業區(中 正段434、437、438 及442 等地 號)興建建築物認定有無妨礙農 業生產情形,102 年8 月21 日農 業發展局(承辦張甄晏)桃農管
監察院公報【第3058 期】 ‧10‧ 字第1020017832 號函復城鄉發 展局稱:434、437、438、442 農 業區地號興建建築物供營業用已 非符農業使用行為,依農業發展 條例第69 條規定,請城鄉發展 局依都市計畫法規定處理等語。 102 年8 月29 日城鄉發展局( 承辦林國強;科長莊敬權)以府 城行字第1020212317 號函請行 為人劉得斌對於(434~439、442 地號)違反土地使用分區管制, 請於文到10 日內陳述意見或提 供行為人資料,該函後由技正宋 仲浩代表機關決行(依據102 年 分層負責明細表係機關首長核定 決行)。惟行為人未如期陳述, 該府城鄉發展局竟未依法裁罰或 依法勒令斷水斷電,亦未追蹤違 反土地使用分區之農業區違建部 分,承辦林國強、科長莊敬權、 核定決行技正宋仲浩均有違失。
- 本院詢問時,宋仲浩稱:102.
- 29 函文有發出去,行為人後來
有無陳述我不清楚,因全局公文 很多,我沒有負責後續追蹤,應 由業務單位行政科自行控管等語 。吳啟民稱:沒有陳述意見就開 罰,實務上沒有嚴格的研考機制 ,事實上由主辦同仁處理,是承 辦人員的疏失等語。 3.查102 年8 月13 日新屋鄉公所 函復城鄉發展局稱:「新屋保齡 球館」所在之建物,坐落農業區 及住宅區,疑似違反土地使用管 制規定。農業發展局於同月21 日 函復該局稱:434、437、438、 442 農業區地號興建建築物供營 業用已非符農業使用行為,依農 業發展條例第69 條規定,請城 鄉發展局依都市計畫法規定處理 等語。該局於102 年8 月29 日 函請行為人說明,該行為人未如 期陳述,該府城鄉發展局竟未依 都市計畫法第79 條規定裁罰, 並勒令拆除、改建、停止使用或 恢復原狀,承辦林國強懈怠職務 ,核有重大違失;科長莊敬權在 公文核章,怠忽職守,有嚴重違 失;依100、101、102 年分層負 責明細表,違反土地使用分區業 務係局長核定,局長吳啟民、核 定決行技正宋仲浩未均盡督導之 責,亦有違失。 (三)城鄉發展局明知劉得斌於「都市計 畫住宅區、農業區」違規興建本案 建物,違法做為保齡球館、電動玩 具店營業使用之事實,卻於接獲 103 年8 月15 日農業發展局函文 請其對違反農業使用依權責核處後 ,於同月21 日發文請農業發展局 依權責輔導合法使用。農業發展局 於103 年12 月2 日因現勘後仍未 改善再以函請城鄉發展局對違反農 業使用請依法核處,城鄉發展局於 103 年12 月19 日函請行為人陳述 意見,違規人未如期陳述意見後, 該局仍未依都市計畫法第79 條規 定裁罰,並勒令拆除、改建、停止 使用或恢復原狀。遲至104 年1 月 20 日本案建物於凌晨2 點大火,造 成6 名消防隊員死亡後,城鄉發展 局始於104 年1 月20 日裁罰7 萬
監察院公報【第3058 期】 ‧11‧ 元,該局承辦林國強、科長莊敬權 、局長吳啟民,核重大違失。 1.103 年8 月15 日農業發展局依該 市農地違規處理原則於103 年8 月15 日以桃農管字第10300170 71 號函請土地所有權人劉○○ 應於103 年11 月20 日前取得合 法設立(使用)文件或恢復農業 使用狀態,並副知工商發展局、 工務局、體育處協助輔導合法使 用。另因該址違規使用土地中有 3 筆(中正段435、436、439 地 號)係屬都市計畫住宅區,該局 103 年8 月15 日桃農管字第 10300170711 號函請城鄉發展局 依權責核處。103 年8 月21 日城 鄉發展局(承辦林國強;科長莊 敬權;都發局長吳啟民(註7) )竟再發文農業發展局(10300 15349 號)稱:有關434、437、 438、442 地號土地興建做營業使 用,請貴局依權責輔導合法使用 ,如經輔導仍屬違規使用者,再 行將輔導紀錄及相關事證送城鄉 局辦理後續裁罰事宜。據此,城 鄉發展局竟仍未依法裁罰或勒令 停止使用並恢復原狀,延誤辦理 時機。農業發展局於103 年12 月 2 日辦理現勘,因現勘後仍未改 善,再以桃農管字第1030026368 號函(承辦張甄晏)城鄉發展局 本案已違反農業使用請依法核處 。城鄉發展局(承辦林國強;科 長莊敬權;局長吳啟民)未依法 裁罰或斷水電,103 年12 月19 日函(註8)稱:劉得斌於「都 市計畫住宅區、農業區」(新屋 鄉中正段434 至439 號、442 號 地號)違規興建建築物、營業使 用(保齡球館、電動玩具店), 違反都市計畫法臺灣省施行細則 第15 條、第29 條規定,應於文 到10 日內陳述意見等語。惟違 規人仍未如期陳述意見,該局未 依都市計畫法第79 條規定裁罰 ,並勒令拆除、改建、停止使用 或恢復原狀,未有何行政作為。 2.本院詢問時,委員詢問:當時依 公所查報資料即可裁罰,為何仍 要移農業發展局?承辦林國強稱 :當時的確有延誤。科長莊敬權 稱:當時只有2 個承辦負責且兼 辦全桃園市的違規等語。局長吳 啟民稱:未連續處罰部分是因為 人力不足,故無法主動去稽查或 複查等語。 3.查103 年8 月15 日農業發展局 函請城鄉發展局依權責核處後, 城鄉發展局竟於同月21 日發文 請農業發展局依權責輔導合法使 用,如經輔導仍屬違規使用者, 再行將輔導紀錄及相關事證送城 鄉局辦理後續裁罰事宜。據此, 城鄉發展局竟仍未依法裁罰並勒 令拆除、改建、停止使用或恢復 原狀,延誤辦理時機。農業發展 局於103 年12 月2 日因現勘後 仍未改善再以函請城鄉發展局稱 :本案已違反農業使用請依法核 處。城鄉發展局於103 年12 月 19 日函稱:劉得斌於「都市計畫 住宅區、農業區」(新屋鄉中正
監察院公報【第3058 期】 ‧12‧ 段434 至439 號、442 號地號) 違規興建建築物、營業使用(保 齡球館、電動玩具店),違反都 市計畫法臺灣省施行細則第15 條 、第29 條規定,應於文到10 日 內陳述意見等語。惟違規人仍未 如期陳述意見,該局仍未依都市 計畫法第79 條規定裁罰,並勒 令拆除、改建、停止使用或恢復 原狀,未有何行政作為。城鄉發 展局放任違規繼續擴大蔓延,縱 容包庇。遲至104 年1 月20 日 本案建物於凌晨2 點大火,造成 6 名消防隊員死亡後,城鄉發展 局始以104 年1 月20 日府都行 字第1040016307 號裁處書(承 辦林國強)針對434~439、442 地號建物營業使用(保齡球館、 電動玩具店)違反都市計畫法臺 灣省施行細則第15、29 條規定 裁罰7 萬元,核重大違失。承辦 林國強懈怠職務、縱容包庇,核 有重大違失;科長莊敬權在公文 核章,怠忽職守,有嚴重違失; 局長吳啟民未盡督導之責,亦有 違失。 四、桃園縣政府工務局於86 年11 月5 日 稽查時發現本案建物有違法使用經營 亞洲保齡球館情形,竟僅拆除「通道 木門加栓乙扇、安全門加設木門乙扇 」,未依法將亞洲保齡球館拆除。該 局於95 年8 月16 日以本案建物違法 使用經營「亞洲音樂餐坊」而依建築 法規定裁罰6 萬元,並命恢復原狀或 補辦手續後,竟僅發函催繳罰鍰,未 依法連續處罰,並限期停止其使用, 且遲至100 年3 月21 日始移送強制 執行繳清罰款。該局於101 年2 月 14 日、101 年8 月3 日兩次收受消防 局指稱本案建物違規使用經營新屋保 齡球館請派員至現場查處之函文後, 竟均將公文存查,且未派員依法查察 。該局因102 年度聯合稽查時,設於 本案建物1 樓之「新亞洲游泳池」與 使用執照之面積及不得對外營業等記 載均顯不相符,竟草率記載複查合格 。該局於103 年6 月19 日聯合稽查 時,明知「新亞洲游泳池」違規使用 ,竟於103 年度桃園縣公私立游泳池 查核結果一覽表中登載初查符合建築 法,複查結果竟違法登記為「符合」 。該局如附表二所示之相關承辦人員 核有重大違失,相關科長、局長郭振 寰督導不周均有疏失。 (一)73 年11 月7 日修正之建築法第70 條第1 項前段規定:「建築工程完 竣後,應由起造人會同承造人及監 造人申請使用執照。」73 年11 月 7 日修正之同法第72 條規定:「 供公眾使用之建築物,依第七十條 之規定申請使用執照時,直轄市、 縣(市)(局)主管建築機關應會 同消防主管機關檢查其消防設備, 合格後方得發給使用執照」。所謂 供公眾使用之建築物,依60 年12 月22 日修正之同法第5 條之規定 :「本法所稱供公眾使用之建築物 ,為供公眾工作、營業、居住、遊 覽、娛樂及其他供公眾使用之建築 物。」60 年12 月22 日修正之同法 第96 條第1 項本文規定:「本法 施行前,供公眾使用之建築物而未
監察院公報【第3058 期】 ‧13‧ 領有使用執照者,其所有權人應申 請核發使用執照」。又84 年8 月 2 日修正之同法第77 條第1 項規定 :「建築物所有權人、使用人應維 護建築物合法使用與其構造及設備 安全」。所謂「合法使用」,依內 政部95 年7 月17 日台內營字第 0950804329 號函,係指「建築物應 符合其現況用途之構造與設備標準 」。違反第77 條第1 項規定者, 92 年6 月5 日修正之同法第91 條 第1 項第2 款之規定:「處建築物 所有權人、使用人、機械遊樂設施 之經營者新臺幣6 萬元以上30 萬 元以下罰鍰,並限期改善或補辦手 續,屆期仍未改善或補辦手續而繼 續使用者,得連續處罰,並限期停 止其使用。必要時,並停止供水供 電、封閉或命其於期限內自行拆除 ,恢復原狀或強制拆除」。該條第 2 項規定:「有供營業使用事實之 建築物,其所有權人、使用人違反 第77 條第1 項有關維護建築物合 法使用與其構造及設備安全規定致 人於死者,處1 年以上7 年以下有 期徒刑,得併科新臺幣100 萬元以 上500 萬元以下罰金;致重傷者, 處6 個月以上5 年以下有期徒刑, 得併科新臺幣50 萬元以上250 萬 元以下罰鍰。」 (二)次按加強建築物公共安全檢查及取 締執行要點(內政部87 年11 月9 日訂定、100 年10 月7 日修正)第 4 點規定:「……各級目的事業主 管機關並應就負責稽查取締項目, 確實依照各該主管法規處理(一)未 經登記即行開業者,依公司法、商 業登記法及各目的事業主管機關法 規處理。(二)違反土地使用分區管 制者,依區域計畫法、都市計畫法 及其施行細則等有關規定辦理。( 三)未經許可擅自修建、改建或裝 修者,依建築法有關規定處理。」 第5 點規定:「建築物有下列情形 之一者,應依相關規定從嚴處理: (一)建築物構造與設備安全檢查合 格,而有擅自變更使用類組及用途 者,應依下列規定辦理:1.擅自變 更使用用途符合土地使用管制之容 許使用項目,依本法第91 條第1 項第1 款規定,處建築物所有權人 或使用人新臺幣6 萬元以上30 萬 元以下罰鍰,並限期補辦手續,屆 期未補辦手續而繼續使用,得連續 處罰。必要時,停止其供水供電」 。依同要點附表二明文規範:所謂 B-1 類之認定原則係指「供娛樂消 費,處封閉或半封閉場所」。(應 清查業別:卡拉OK 等視聽歌唱業 。)並列為第一順序。保齡球館為 D-1 類,認定原則係指「供低密度 使用人口運動休閒之場所」。據此 ,依上開規定視聽歌唱業B1 類組 或D-1 類之保齡球館,各縣市政府 應依法加強建築物公共安全檢查, 並通報及取締不法。 (三)本案建物違規營業使用,該府工務 局歷年稽查不實,放任農業區大型 違章建築釀災,違失如下: 1.該府工務局於86 年11 月5 日稽 查時發現本案大型違建,竟未落 實執法,僅拆除「通道木門加栓
監察院公報【第3058 期】 ‧14‧ 乙扇、安全門加設木門乙扇」, 亞洲保齡球館未拆,時任承辦人 員陳建業(註9),隊長古沼格 顯有違失。 (1)縣府工務局86 年11 月5 日拆 除日誌記載,該局工程隊公共 安檢組陳建業技工(103 年7 月屆齡退休)配合八大行業聯 合稽查小組稽查4 家營業場所 ,並帶領拆除人員2 名(工務 局時任承辦人員陳建業,隊長 古沼格,局長劉永和),執行 情形明載:「1、新屋鄉中興 北路101 號2 樓新亞洲音樂茶 坊(拆除通道木門加栓乙扇、 安全門加設木門乙扇)。…… 3、亞洲保齡球館未拆」。 (2)由上述資料顯示,該府工務局 發現本案大型違建存在,竟未 落實執法,僅拆除「通道木門 加栓乙扇、安全門加設木門乙 扇」。本院詢問時,時任隊長 古沼格稱:他的逃生通道如果 沒有上鎖,就不會動手拆除, 晚上值勤是八大行業的勤務, 只做簡單的拆除動作,我接隊 長時違建要拆,但限於人力及 機具力有未逮,違章建築就是 查報及認定後來拆除,依拆除 能量來處理。當時帶班人員是 陳先生,我沒有看過該違建等 語。時任承辦人員陳建業,隊 長古沼格任由農地大型違建存 在,未能依法切實處置,已有 違失。 2.該府工務局於95 年8 月16 日以 本案建物違法經營「亞洲音樂餐 坊」視聽歌唱業,依建築法第91 條第1 項規定裁罰6 萬元,並命 恢復原狀或補辦手續後,受處分 人置之不理,該局僅發函催繳罰 鍰,未依法連續處罰,並限期停 止其使用,且遲至100 年3 月21 日始移送強制執行繳清罰款,承 辦人李佩恩核有嚴重違失,課長 王振鴻與工務局局長郭蔡文督導 不切實,亦有疏失。 (1)95 年8 月10 日縣府聯合查報 小組稽查案址(註10)2 樓之 「亞洲音樂餐坊」,該府工務 局以本案建物未經變更擅自經 營視聽歌唱業、天花板裝修材 料無防焰證明、未完成辦理建 築物公共安全檢查簽證與申報 ,違反建築法第73 條第2 項 (註11)、第77 條之2 第1 項(註12)及77 條第1 項( 註13)、第3 項(註14)規 定,後依建築法第91 條第1 項(註15)及該府公共安全 檢查罰鍰標準,於95 年8 月 16 日府工使字第0950240092 號裁處書,處罰6 萬元,並於 裁罰書敘明「請於文到30 日 內恢復原狀或補辦手續,屆期 仍未改善或補辦手續而繼續使 用者,得連續處罰,並限期停 止其使用」。惟,受處分人姜 禮德未繳納,工務局於96 年 1 月17 日(工務局使用管理 課承辦人李佩恩,課長(註16 )王振鴻決行;工務局局長:
監察院公報【第3058 期】 ‧15‧ 郭蔡文(註17)、同年4 月12 日(工務局使用管理課承辦人 李佩恩,課長王振鴻決行;工 務局局長郭蔡文)僅發函催繳 罰鍰,未依法連續處罰並限期 停止其使用。本案後於96 年 9 月26 日依法移送,竟遲至 100 年3 月21 日移送法務部行 政執行署強制執行方繳清完畢 ,惟已逾3 年半。 (2)本院詢問時,課長王振鴻稱: 裁處書由我決行,是我決定, 要到下次有複查才會繼續處分 。當時實務上做法就是排稽查 後,等目的事業主管機關再排 時才會再稽查。就我的瞭解, 95 年到99 年初,應該是沒有 再複查等語。工務局局長郭蔡 文稱:移送法辦部分,第一次 由罰款叫他們補辦手續、改善 ,再來就連續罰款,如果再沒 有,就停止營業,再斷水斷電 。本案尚未到移送法辦程度, 95 年縣府有發布違規場所斷水 斷電作業要點,本案不屬於該 類行業範圍等語。 (3)經查該府工務局於95 年8 月 10 日聯合稽查後,以本案建物 經營「亞洲音樂餐坊」視聽歌 唱業,違反建築法第73 條第 2 項、第77 條之2 第1 項及 77 條第1 項、第3 項規定, 依建築法第91 條第1 項及該 府公共安全檢查罰鍰標準,於 95 年8 月16 日裁罰6 萬元, 並於裁罰書敘明「請於文到30 日內恢復原狀或補辦手續,屆 期仍未改善或補辦手續而繼續 使用者,得連續處罰,並限期 停止其使用」。惟受處分人姜 禮德未繳納罰鍰,工務局於96 年1 月17 日、同年4 月12 日 僅發函催繳罰鍰,未依法連續 處罰並限期停止其使用,且遲 至100 年3 月21 日始移送法 務部行政執行署強制執行繳清 完畢,承辦人李佩恩核有嚴重 違失,課長王振鴻與工務局局 長郭蔡文督導不切實,亦有疏 失。 3.101 年2 月14 日消防局行文工務 局,指稱設於本案建物之新屋保 齡球館有違規使用情形,請工務 局儘速派員至現場查處,時任主 管科長劉棕元(註18)竟將該公 文存查,且未派員依法查察,顯 有違失,工務局長古沼格(註19 )督導不周亦有疏失。 (1)101 年1 月3 日縣府消防局新 屋分隊於實施消防安全設備檢 修申報複查作業及消防設備安 全檢查,發現新屋保齡球館有 「違規使用」等違規查報情形 ,101 年2 月14 日消防局以 桃消預字1010110189 號函請 工務局派員至現場查處,該函 之說明稱:為維護公共安全, 有關貴管權責部分,請儘速派 員至現場查處,以免發生災害 肇致人命傷亡,旨揭清冊僅依 現場狀況發現場所恐有影響公 共安全之虞而提供資訊,勿為
監察院公報【第3058 期】 ‧16‧ 裁罰依據等語。 (2)惟查,本件101 年2 月14 日 公文,工務局於收文後理應派 員查核是否屬實,該局管理科 承辦鄔承傑收文後,僅由時任 主管科長劉棕元決行「存查」 ,後續竟未再派員查察,並有 電腦公文系統存查資料可稽, 辦理過程顯有違誤。 (3)本院詢問時,時任科長劉棕元 稱:消防局發文到市府時裡面 有幾百件,會再排班稽查,文 不可能一直掛在那邊。工務局 以八大行業為優先,其他則由 目的事業主管機關去執行。排 班稽查有優先順序,當時作業 不是八大行業就配合目的事業 主管機關等語。 (4)劉棕元雖稱會再排班稽查,卻 將消防局的公文存查,本案後 續未改善且違規使用建築物後 續也未依法辦理,另依據工務 局分層負責明細表,使用管理 科違規使用認定、罰鍰、斷水 斷電業務係科長核定,時任工 務局管理科長劉棕元(註20) 涉有違誤,另工務局長古沼格 (註21)涉有督導不周,辦理 過程亦有疏失。 4.101 年8 月3 日消防局再次行文 工務局,指稱新屋保齡球館有違 規使用情形,請工務局派員至現 場查處。該局收文後,時任工務 局管理科長鄔承傑(註22)決行 「存查」,後續未再派員查察, 實有違失。違章建築資料之處理 轉報由局長核定,工務局長古沼 格亦有督導不周之違失。 (1)101 年7 月1 日縣府消防局新 屋分隊再次實施消防安全設備 檢修申報複查作業及消防設備 安全檢查,發現新屋保齡球館 有「單一出入口(建築技術規 則施工篇第88 條)、違規使用 」,以及亞洲室內游泳池有「 安全梯不符、安全梯損壞、單 一出入口(建築技術規則施工 篇第88 條)」等違規查報情 形,消防局於101 年8 月3 日 桃消預字1010111121 號函請 工務局派員至現場查處。 (2)工務局於8 月9 日由管理科承 辦陳志清收受上開101 年8 月 3 日公文後,單位代理主管鄔 承傑決行「存查」,後續未再 派員查察,並有電腦公文系統 存查資料可稽,辦理過程顯有 違誤。 (3)本院詢問時,鄔承傑稱:8 月 份的文是我代理科長決行,承 辦人為陳志清。違規使用不是 由消防局認定,工務局是配合 各目的事業主管機關排班稽查 ,我們只會針對特定行業等去 排班等語。陳志清稱:101 年 8 月3 日函我是承辦等語。時 任局長古沼格稱:因八大行業 是依使用行為去稽查,建築拆 除勤務不會排晚上,KTV 屬八 大行業,當時晚上去看的人如 果沒有看到有堵塞的情形,就 註記未拆,逃生動線有阻礙物
監察院公報【第3058 期】 ‧17‧ 時才會去處理。消防局每半年 都會去查,查出來後就會把這 個表通知相關單位,當時作業 方式因案件很多,會排班處理 。程序為公所查報、建管課認 定後拆除組再執行拆除程序, 本案印象為農業區違建,86 年 時為分期分階段處理等語。 (4)查電腦系統顯示工務局將該消 防局函文存查,工務局收受函 文後並未排班稽查。依工務局 100 年5 月版分層負責明細表 ,使用管理科違規使用認定、 罰鍰、斷水斷電業務係科長核 定,本案後續未改善且違規使 用建築物後續也未移送法辦, 時任工務局管理科長鄔承傑( 註23)顯有違誤,另違章建築 資料之處理轉報由局長核定, 工務局長古沼格涉有督導不周 ,亦有違失。 5.工務局102 年7 月2 日承辦林彥 谷於「新亞洲游泳池」之查核表 中勾選「不符合建築法規定」, 並加註「未見公安申報資料、未 見使用執照」。該府於102 年8 月22 日實施複查,「新亞洲游 泳池」之複查表單竟「空白未勾 選」。本案建物使用執照記載第 一層用途為自用游泳池,不得對 外營業(合法面積為439.82 平 方公尺),但本案建物樓游泳池 之實際面積達高達2,317.9 平方 公尺,且坐落於農業區,工務局 竟率予以複查合格,工務局102 年7 月2 日承辦科員林彥谷查報 不實,顯有違失,時任工務局使 用管理科科長潘子儀(註24)、 時任局長朱惕之(註25)督導不 周,亦有疏失。 (1)縣府體育處辦理102 年度公私 立游泳池聯合查核,有關「新 亞洲游泳池」之查核情形,工 務局102 年7 月2 日承辦林彥 谷於「新亞洲游泳池」之查核 表中勾選「不符合建築法規定 」,並加註:「未見公安申報 資料、未見使用執照」。該府 於102 年8 月22 日實施複查 ,「新亞洲游泳池」之複查表 單竟「空白未勾選」,僅業者 劉○○與體育處承辦劉姿含簽 名。體育處說明稱:工務局於 8 月15 日以電子郵件函覆體育 處,「新亞洲游泳池」之複查 結果「1.領有83 桃縣工建使字 第01392 使用執照,用途為游 泳池。2.101 年度公安申報合格 。」。 (2)惟查,本案工務局複查顯有不 實,案址縣府工務局於83 年 10 月19 日核發(83)桃縣工 建使字第01392 號使用執照, 該使用執照註記:第一層用途 為自用游泳池,不得對外營業 (合法面積為439.82 平方公尺 ),第二層為住宅(合法面積 為379.65 平方公尺),但本案 建物游泳池位於一樓之實際面 積達2,317.9 平方公尺,且坐 落於農業區,工務局竟率予以 複查合格,顯有違失。
監察院公報【第3058 期】 ‧18‧ (3)本院詢問時,時任工務局局長 朱惕之稱:拆除違章為當時工 務局的業務,但拆除的量很大 ,主要為抑制新的違建。一般 而言我們會相信專業機關所提 供的資料,包含其簽證內容, 作業上是可以再嚴謹一點。使 用執照與現況不符當然要進一 步查證,每個承辦人的工作量 都很大,但嚴謹度要再深入瞭 解等語。時任拆除科科長楊曜 華稱:使用執照永久保存,系 統上應該可以調到等語。顯見 承辦人員未能核實由系統中調 閱本案使用執照存根,切實查 核,否則應能發現該使用執照 註記「自用游泳池不得對外營 業」之事實,辦理過程顯有違 誤。另依據該府工務局分層負 責明細表,使用管理科違規使 用認定業務係科長核定,本案 時任工務局使用管理科科長潘 子儀(註26)顯有違誤。另違 章建築拆除科之違章建築督導 考核協調、資料處理轉報業務 係局長核定,本案時任局長朱 惕之(註27)督導不周,亦有 疏失。 6.103 年6 月19 日聯合稽查時, 工務局於「新亞洲游泳池」之查 核表中未勾「符合或不符合建築 法規定」,但該局於103 年度桃 園縣公私立游泳池查核結果一覽 表中卻登載「新亞洲游泳池」初 查符合建築法。該府於103 年8 月11 日複查表單中皆空白未勾 選,但複查結果竟為「符合」, 工務局使用管理科承辦胡博理初 查及複查作業查核不實,核有違 失,時任工務局使用管理科代理 科長陳育時(註28)、潘子儀( 註29)顯未能善盡職責切實督 導核定違規使用之查核,局長郭 振寰(註30)、江南志(註31) 對於督導考核顯有不周,均有疏 失。 (1)縣府體育處辦理103 年度公私 立游泳池聯合查核,有關「新 亞洲游泳池」之查核情形,依 據103 年6 月19 日工務局使 用管理科承辦胡博理於「新亞 洲游泳池」之查核表中未勾「 符合或不符合建築法規定」, 僅於缺失情形註記:「已辦理 公共安全申報,下次申報時間 103.7.1-103.9.30,請注意於期 限內申報」。另依據103 年度 桃園縣公私立游泳池查核結果 一覽表-初查「新亞洲游泳池 」,工務局於「建築設備是否 符合建築法」一欄中登載「符 合」。該府後於103 年8 月11 日實施複查,依據「新亞洲游 泳池」之複查表單,竟皆空白 未勾選,僅業者劉○○與體育 處承辦蘇明深簽名,但複查結 果竟為「符合」,顯見本案工 務局初查以及複查作業再度不 實,核有違失。 (2)本院詢問時,承辦胡博理稱: 業者沒有提供使用執照,當下 沒有辦法看到使用執照。後續
監察院公報【第3058 期】 ‧19‧ 依體育處函文續處,但卡在說 會勘紀錄有點誤會,似乎是體 育處整理後的紀錄載明合格, 以至於這部分沒有人去檢視, 那時候應該是沒有直接向長官 報告。時任拆除科科長楊曜華 答:使用執照永久保存,系統 上應該可以調到等語。時任使 用管理科代理科長陳育時稱 :違反使用就依規定裁罰,是 否有查須再確認,當時為我代 理。時任局長郭振寰稱:當時 為未勾,可能不夠嚴謹,於 103.8.11 複核,當時認為已公 安申報所以符合,那是聯合稽 查表,體育處回復之後由承辦 辦理等語。時任科長潘子儀稱 :現場勾選完後由主責機關帶 回,承辦人看過而已,複查資 料彙報照慣例是由股長決行等 語。 (3)經查胡博理未能核實由系統中 調閱本案使用執照存根,切實 查核,未能發現該使用執照註 記「自用游泳池不得對外營業 」以及農地大型違建之事實, 辦理過程顯有違誤。另據該府 工務局分層負責明細表,使用 管理科違規使用認定業務係科 長核定,違章建築拆除科之違 章建築督導考核協調、資料處 理轉報業務係局長核定,本案 時任工務局使用管理科代理科 長陳育時(註32)、科長潘子 儀(註33)顯未能善盡職責切 實督導核定違規使用之查核, 另局長郭振寰(註34)、江南 志(註35)對於督導考核顯有 不周,亦有疏失。 五、桃園縣新屋鄉公所工務課技士鄭紹春 於103 年8 月間處理查報本案違物時 ,明知1 樓係在法定空地擅自搭建並 經營新亞洲游泳池、2 樓係搭建於供 公眾使用建築物屋頂避難平台並經營 新屋保齡球館,屬於應於第1 階段處 理、填發拆除單並於30 個工作天內 拆除之A3 類違建物,竟於103 年8 月29 日於查報單上填載屬於應於第 二階段處理之B 類違建物。桃園縣政 府工務局拆除科約僱人員張嘉隆於 103 年9 月2 日審查時,明知鄭紹春 之登載有誤,卻未更改為應於30 個 工作天內拆除A3 類,而違法更改為 應經審查、確認拆除對象及排定拆除 順序之A7 類,並於103 年9 月3 日 函請違建人依法限期改善,由拆除科 楊曜華科長代為決行。鄭紹春、張嘉 隆之上開行為使本案建物之拆除順序 延後,嗣該建物於104 年1 月20 日 發生火災造成6 名消防隊員死亡,核 有嚴重違失,桃園地檢署亦為相同之 認定,於104 年5 月22 日對2 人以 涉犯偽造文書罪提起公訴在案。時任 科長楊曜華、時任局長江南志監督不 周,亦有違失。 (一)101 年12 月25 日修正之「桃園縣 政府執行違章建築拆除作業要點」 (下稱拆除作業要點)第6 點(三 )1.及(七)規定:「第一階段(近 程處理)處理左列危害公共安全、 山坡地水土保持、妨害公共交通、 公共衛生、市容觀瞻之違章建築:
監察院公報【第3058 期】 ‧20‧ ……(三)電腦代號A3:1.在供公 眾使用建築物屋頂避難平台、法定 空地等擅自搭建,影響共同使用者 權益,有礙消防救災及逃生安全之 違章建築。……(七)電腦代號A7 :非供公眾使用建築物在屋頂、法 定空地等擅自搭蓋之違章建築。」 第7 點(一)規定:「第6 點第1 款 至第4 款其執行方式如左:(一)經 各目的事業主管機關(單位)認定 後,由本府工務局填發拆除單,於 30 個工作天內拆除。」第8 點(一 )規定:「第6 點第5 款至第8 款 其執行方式:(一)成立違章建築審 議小組:依目的事業主管機關(單 位)移送案件予以審查,確認拆除 對象及排定拆除順序。」第9 點規 定:「第二階段(中程處理)處理 建築面積在300 平方公尺以上之違 章建築;俟第一階段全部執行完成 後開始辦理(電腦代號B)。」 (二)103 年8 月15 日農業發展局針對 本案農業區(中正段434、437、 438 及442 等地號)4 筆地號,依 該市農地違規處理原則以桃農管字 第1030017071 號函請土地所有權 人劉○○應於103 年11 月20 日前 取得合法設立(使用)文件或恢復 農業使用狀態,並副知工商發展局 、工務局、體育處協助輔導合法使 用。103 年8 月25 日工務局拆除 科承辦張嘉隆以桃工拆字第10300 59026 號函請新屋鄉公所協助查報 「新屋鄉中正段434、437、438、 442 地號農業區土地興建建物作保 齡球館使用」疑涉違章建築情形。 (三)鄭紹春於101 年9 月17 日起任桃 園縣新屋鄉公所(現改制為桃園市 新屋區公所)工務課技士,負責處 理轄區內違章建築查報公務。張嘉 隆於99 年2 月1 日起任桃園縣政 府工務局拆除科約僱人員,負責處 理桃園縣新屋鄉境內違章建築認定 與拆除業務。鄭紹春於103 年8 月 間,處理查報本案違物時,明知該 處1 樓係經營新亞洲游泳池、2 樓 經營新屋保齡球館,1 樓違章建築 係在法定空地擅自搭建,2 樓違章 建築係搭建於供公眾使用建築物屋 頂避難平台,1、2 樓面積僅各為 2,757.72 平方公尺、2,580.65 平方 公尺,其中合法面積僅各為439.82 平方公尺、379.65 平方公尺,其餘 均屬違建,故該建物屬於桃園縣政 府執行違章建築拆除作業要點第6 點所規定,屬於第1 階段處理,應 填發拆除單並於三十個工作天內拆 除之A3 類,竟於103 年8 月29 日 桃新鄉工字第1030017835 號函中 ,填載本案違建「桃園縣新屋鄉公 所違章建築查報單」時,以應於第 二階段(中程處理)處理(俟第一 階段全部執行完成後開始辦理)之 B 類違建,報該府工務局續處。張 嘉隆於103 年9 月2 日,在桃園縣 政府工務局審查鄭紹春所查報之資 料時,明知鄭紹春之登載有誤,本 應將本案違建之違建分級登載更改 為屬於第1 階段處理、應填發拆除 單並於30 個工作天內拆除之A3 類 ,卻更改為應成立違章建築審議小 組審查、確認拆除對象及排定拆除
監察院公報【第3058 期】 ‧21‧ 順序之A7 類,於103 年9 月3 日 函(註36)請違建人依法限期改善 ,並由拆除科楊曜華科長代為決行 。鄭紹春、張嘉隆之上開行為使本 案建物之拆除順序延後,嗣於104 年1 月20 日凌晨2 時許於新屋保 齡球館發生火災,造成6 名消防隊 員死亡。 (四)上開事實,業據本院調閱桃園地檢 署104 年偵字第4144 號、7427 號 、9538 號、10568 號貪污治罪條例 等案卷查明屬實,鄭紹春及張嘉隆 於桃園市調查處調查及地檢署偵訊 時坦承有登載之事實,並經證人即 該公所課長徐浩桓、主秘黃紹轅及 桃園縣政府工務局股長何基豪;科 長楊曜華等證述明確,並有該所 103 年8 月29 日函及所附查報單、 桃園縣政府工務局103 年9 月3 日 函復於偵查卷內可稽,可信為真實 。本院詢問時,鄭紹春雖辯稱:本 案自始至終皆非A3、A7,故為B 類方屬正確,我要查報的是農地, 公文表示是查農地,公所只是查報 建議權,沒有認定權,我們課長徐 浩桓表示只能依來文進行查報農地 等語。但張嘉隆稱:我沒有看過此 違建,要求公所查報違建部分,農 地或建地上,屬於違章建築部分就 要查報等語。楊曜華稱:要查的範 圍應該是查整個違建等語,故鄭紹 春所辯不足採信。張嘉隆雖辯稱: 我沒有看過此違建等語。楊曜華亦 稱:公所查報單認定為B 類,但有 涉及到中正段264 號建號增建,就 有自用泳池的增建,所以認為是法 定空地的增建,才認為是A7,修 正A7 類是同仁來確定,我再依資 料來研判,更改A7 是張嘉隆確定 的等語。惟江南志稱:如果有去現 場看,就有機會察覺為A3 類,是 否供公眾使用還是要去查報,原來 的執照是為非公眾使用等語。張嘉 隆明知公所查報單認定為B 類係屬 錯誤,公所之查報單明載本案建物 第一層及第二層違規增建各為 2,201 平方公尺,面積為使用執照 的數倍,衡情應知悉該建物係作為 營業供公眾使用之A3 建物,而非 自用之A7 類,且縱使不知該建物 是何用途,亦應向公所承辦詢問, 卻逕認定為自用之A7,即有不確 定之故意或有嚴重之過失,其辯稱 因未到現場查看才登載為非供公眾 使用之A7 建物云云,亦無足採。 桃園地檢署亦為相同之認定,於 104 年5 月22 日對鄭紹春及張嘉 隆分別以涉犯行使公務員登載不實 公文書罪、公務員登載不實公文書 罪提起公訴在案。鄭紹春及張嘉隆 上開行為均有嚴重疏失。 (五)103 年9 月3 日承辦張嘉隆函請知 行為人,說明已違反建築法第25 條規定,依同法第86 條規定,「 應立即停止使用」,請於文到30 日 內補行申請執照,如申請執照不合 規定或逾期未補辦申領執照手續者 ,該局續依建築法第86 條及違章 建築管理辦法等相關規定予以列管 拆除,並由拆除科楊曜華科長代為 決行。依縣府工務局分層負責明細 表,拆除科違章建築拆除函及公告
監察院公報【第3058 期】 ‧22‧ 、勘查、認定業務係科長核定,本 案雖僅科長決行,簽稿未上到局長 ,但違章建築拆除科之違章建築督 導考核協調業務係局長核定,未切 實督導「應立即停止使用」,難辭 管理失當之責,該局承辦顯未能切 實依桃園縣政府執行違章建築拆除 作業要點第6 點切實認定,辦理違 建規模處理程序顯有疏失,時任科 長楊曜華、江南志局長(103.7.31- 103.12.24)督導不周,亦有違失。 (六)本案一再錯失遏止良機造成本案農 業區之無使用執照大型違建任其存 在,未落實依法停止使用,至104 年1 月20 日凌晨2 點大火,造成 消防隊員傷亡。該府工務局怠至21 天後,於104 年2 月11 日方以桃 工拆字第1040011937 號函請業者 ,有關434、437、438、442 地號 違章建築已違反建築法第25 條( 註37)規定,依同法第81 條(註 38)、第86 條(註39)規定應立 即停止使用,並請於文到30 日內 自行拆除。 (七)綜上,桃園縣新屋鄉公所工務課技 士鄭紹春於103 年8 月間處理查報 本案違物時,明知1 樓、2 樓分別 經營新亞洲游泳池、新屋保齡球館 ,1 樓違章建築係在法定空地擅自 搭建,2 樓違章建築係搭建於供公 眾使用建築物屋頂避難平台,1、2 樓面積僅各為2,757.72 平方公尺、 2,580.65 平方公尺,其中合法面積 僅各為439.82 平方公尺、379.65 平 方公尺,其餘均屬違建,故該建物 依拆除作業要點第6 點所規定,屬 於第1 階段處理,應填發拆除單並 於30 個工作天內拆除之A3 類,竟 於103 年8 月29 日桃新鄉工字第 1030017835 號函中,填載本案違建 「桃園縣新屋鄉公所違章建築查報 單」時,以應於第二階段(中程處 理)處理(俟第一階段全部執行完 成後開始辦理)之B 類違建,報該 府工務局續處。桃園縣政府工務局 拆除科約僱人員張嘉隆於103 年9 月2 日,在桃園縣政府工務局審查 鄭紹春所查報之資料時,明知鄭紹 春之登載有誤,本應將本案違建之 違建分級登載更改為屬於第一階段 處理、應填發拆除單並於30 個工 作天內拆除之A3 類,卻更改為應 成立違章建築審議小組審查、確認 拆除對象及排定拆除順序之A7 類 ,於103 年9 月3 日函請違建人依 法限期改善,並由拆除科楊曜華科 長代為決行。鄭紹春、張嘉隆之上 開行為使本案建物之拆除順序延後 ,嗣於104 年1 月20 日凌晨2 時 許於新屋保齡球館發生火災,造成 6 名消防隊員死亡,工務局怠於處 理致釀災禍,核有嚴重違失,桃園 地檢署亦為相同之認定,於104 年 5 月22 日對鄭紹春及張嘉隆分別以 涉犯行使公務員登載不實公文書罪 、公務員登載不實公文書罪提起公 訴在案。時任科長楊曜華、時任局 長江南志監督不周,亦有違失。 六、桃園縣政府經濟發展局對於未辦理營 利事業登記違法設於本案建物之「亞 洲音樂餐坊」,於95 年8 月15 日依 商業登記法第32 條規定裁處2 萬元
監察院公報【第3058 期】 ‧23‧ 罰鍰,惟並未依該條規定命勒令停業 ,時任承辦朱光健、課長沈綉鈴顯有 疏失。商業登記法於98 年3 月12 日 修正改採登記與管理分離制度後,業 者於本案建物違規設立新亞洲游泳池 、佳宜音樂餐坊,該局竟於99 年4 月13 日及6 月11 日核發商業登記許 可,僅以副本方式通知目的事業主管 機關自行查核,欠缺橫向聯繫,有關 單位亦漏未查核,使業者可以藉由合 法掩護非法經營,顯有缺失。 (一)95 年8 月10 日縣府聯合查報小組 稽查「亞洲音樂餐坊」,因業者未 辦理營利事業登記而違反商業登記 法規定,經濟發展局於95 年8 月 15 日府商輔字第0950237285 號裁 處書裁處2 萬元,惟並未依法勒令 停業,時任承辦朱光健、課長沈綉 鈴顯有疏失: 1.91 年12 月18 日修正之商業登記 法第3 條規定:「商業及其分支 機構,除第4 條第1 項規定外, 非經主管機關登記,不得開業。 」第32 條規定:「違反第3 條 規定,未經登記即行開業者,其 行為人各處新臺幣1 萬元以上3 萬元以下罰鍰,並由主管機關命 令停業(第1 項)。經主管機關 依前項規定處分後仍拒不停業者 ,得按月連續處罰(第2 項)。」 2.經查,95 年8 月10 日縣府聯合 查報小組稽查「亞洲音樂餐坊」 ,因該業者未辦理營利事業登記 經營視聽歌唱業、飲酒店業,違 反商業登記法第3 條,依上開商 業登記法第32 條第1 項規定, 經濟發展局於95 年8 月15 日府 商輔字第0950237285 號裁處書 裁處2 萬元在案並已繳納。惟僅 裁罰未依第32 條勒令停業,及 後續追蹤列管,本院詢問時,經 發局承辦約僱科員朱光健稱:95 年8 月15 日有依法裁處罰鍰2 萬元及命令立即停業。沈綉鈴課 長稱:依法得按月連續處罰。依 各單位查報、檢舉或排班聯合稽 查處理,實務面上要去現場去認 定有無營業事實,課內會進行聯 合稽查的排班,課內都有承辦區 ,有再查報並發現事實時處理等 語。惟查,本案僅處罰鍰2 萬元 後據稱回到聯合稽查辦理,該局 亦提不出其他稽查或勒令停業紀 錄,辦理過程顯未盡切實。 (二)98 年3 月12 日修正之商業登記法 改採「登記與管理分離」制度後, 業者於坐落於農業區與住宅區且無 使用執照之本案建物違規設立新亞 洲游泳池、佳宜音樂餐坊,竟於99 年4 月13 日及6 月11 日獲准縣府 經濟發展局之商業登記許可,藉由 合法掩護非法經營,經濟發展局僅 以副本方式通知目的事業主管機關 自行查核,欠缺橫向聯繫,有關單 位亦漏未查核,制度面顯有缺失: 1.有關商業管理制度,行政院於58 年發布「營利事業統一發證辦法 」規定後,非經建管、衛生、消 防等單位核發使用執照或檢查合 格後,不得申請營業登記或發給 營利事業登記證。惟查,該營利 事業統一發證制度於98 年3 月
監察院公報【第3058 期】 ‧24‧ 12 日經行政院以院臺經字第 0980006249D 號令廢止,改採「 登記與管理分離」制度,商業登 記機關於核准登記時,以電子公 文副知稅捐、都計、建管、消防 、衛生等單位,便利其為主管法 令之輔導、稽查或管理,並於98 年4 月2 日經濟部經商字第 09802406680 號公告「直轄市政 府及縣(市)政府核發之營利事 業登記證自98 年4 月13 日起不 再做為證明文件」。行政院98 年 3 月12 日令發布於同年4 月13 日施行之商業登記法第7 條規定 :「商業之經營有違反法律或法 規命令,受勒令歇業處分確定者 ,應由處分機關通知商業所在地 主管機關,廢止其商業登記或部 分登記事項。」此條雖有業者受 勒令歇業處分確定者廢止其商業 登記或部分登記事項之規定,惟 100 年6 月14 日內政部台內營 字第1000107383 號函釋明載: 「土地或建築物之使用違反都市 計畫法、建築法相關規定,處分 機關依據都市計畫法第79 條、 建築法第91 條第1 項等規定裁 處停止使用、停止供水供電等處 分,其性質非屬裁罰性行政處分 ,亦非屬勒令歇業。」據此,業 者領有商業登記許可後,其建管 、消防、衛生等不一定符合有關 法令,如依建築法勒令停止使用 亦非屬勒令歇業,衍生合法掩護 非法之嚴重公安問題。 2.99 年4 月13 日業者於本案建物 1 樓申請設立「新亞洲游泳池」 商業登記,後經縣府經濟發展局 於99 年4 月13 日以府商登字第 0990503635 號函核准申請設立 登記,所營業務登記有J801030 競技及休閒運動場館業(如游泳 池、撞球場、保齡球館……技擊 等)、F204110(衣著、鞋…… 服飾品零售業)及F203010(食 品、飲料零售業)等3 類,其副 本收受機關為財政部臺灣省北區 國稅局桃園縣分局、桃園縣商業 會、桃園縣政府衛生局、桃園縣 政府消防局、該府工務處及城鄉 發展處。 3.99 年6 月11 日縣府核發設於本 案建物2 樓「佳宜音樂餐坊」之 商業登記許可,所營業務為「 F203020 菸酒零售業」、「 F203010 食品什貨、飲料零售業 」、「F206020 日常用品零售業 」及「ZZ99999 除許可業務外, 得經營法令非禁止或限制之業務 」。經濟發展局說明稱:申設合 乎有關規定,視聽歌唱業營業項 目代碼為「J701030」,尚非前開 所述之許可業務,爰尚無違反商 業登記法規定等語。 4.經查,據市府工務局說明,登管 分離制度實施後,工商發展局副 知相關登記資料,僅記載公司名 稱及地址,若針對各案審查需耗 費較多人力及時間調閱使用執照 、土地謄本、建物謄本及竣工圖 說等,或向公所查詢,因此,類 此案件過去均未掛文號處理,後
監察院公報【第3058 期】 ‧25‧ 續工務局多以配合各目的事業主 管機關聯合稽查代替個案查核。 另依城鄉發展局都市行政科說明 ,登管分離制度實施後,工商發 展局副知相關登記資料,100 年 以前,副本會由承辦人自行收存 ,通常未掛文號,100 年以後, 經秘書室要求副本亦須掛文號, 並依都市計畫法第40 條存參。 5.102 年7 月31 日財政部北區國 稅局函知縣府工商發展局新屋保 齡球館未依法申辦商業設立登記 即經營「電動玩具店」,該府後 於102 年8 月5 日實施聯合稽查 ,該府工商發展局後續辦理竟未 勒令業者停止「電動玩具店」之 營業,反於102 年8 月5 日以桃 商登字第1020022416 號函請新 屋保齡球館負責人於15 日內辦 理商業登記,並副知該府城鄉發 展局等機關(警察、衛生、環保 、地政、社會、該局工商輔導科 )。經查本案發現於都市計畫、 建築管理、消防安全皆有問題前 提下,竟能合法取得商業登記, 以合法掩護非法,致釀災禍,過 程令人扼腕。 6.綜上,業者於本案建物申請設立 新亞洲游泳池、佳宜音樂餐坊, 行政院98 年3 月12 日令發布於 同年4 月13 日施行之商業登記 法改採「登記與管理分離」制度 ,業者於99 年4 月13 日及6 月 11 日獲准縣府經濟發展局之商業 登記許可,藉由合法掩護非法經 營,經濟發展局僅以副本方式通 知目的事業主管機關自行查核, 機關間與鄰為壑欠缺橫向聯繫, 有關單位亦漏未查核,制度面與 執行面殊值檢討改進。 七、桃園縣政府農業局依葉世文副縣長召 開會議之決議及黃宏斌副縣長之指示 ,做成農地違規案件處理流程及處理 原則,於103 年5 月13 日函知各單 位,有關農地疑似違規使用案件,農 業局先至現場勘查予以輔導其合法使 用農地。該局知悉本案建物坐落農地 違法供新屋保齡球館等營業使用,且 明知該農地不能取得合法設立使用文 件,無法輔導使其合法化,卻於103 年8 月15 日發函請土地所有權人於 103 年11 月20 日前取得合法設立使 用文件或恢復農業使用狀態,並副知 工商發展局、工務局、體育處協助輔 導合法使用;該局遲至103 年12 月 2 日始辦理現勘,於103 年12 月4 日 移請城鄉發展局依法核處,新屋保齡 球館卻於104 年1 月20 日發生火災 ,承辦張甄晏、科長黃玉詩、局長曾 榮鑑督導不周即有違失。 (一)農業發展條例第1 條前段規定:「 為確保農業永續發展,因應農業國 際化及自由化,促進農地合理利用 ,調整農業產業結構,穩定農業產 銷,增進農民所得及福利,提高農 民生活水準,特制定本條例。」第 32 條規定:「直轄市或縣(市)政 府對農業用地之違規使用,應加強 稽查及取締;並得併同依土地相關 法規成立之違規聯合取締小組辦理 (第1 項)。為加強農業用地違規 使用之稽查,中央主管機關得訂定
監察院公報【第3058 期】 ‧26‧ 農業用地違規使用檢舉獎勵辦法( 第1 項)。」第69 條第1 項定: 「農業用地違反區域計畫法或都市 計畫法土地使用管制規定者,應依 區域計畫法或都市計畫法規定處理 。」據此,主管機關桃園市農業發 展局依其規定應落實「農地農用」 管制政策,並依農業發展條例第32 條規定加強稽查及取締,如有違反 並通知相關單位如都市發展局依都 市計畫法第79、80 條處罰,合先 敘明。 (二)有關農地違規使用之管理問題,桃 園縣政府曾於103 年3 月17 日由 葉世文副縣長召開之「調整本府 1999 及縣政信箱回應方式研商會 議」中,針對涉及農業用地違規使 用部分作成下列決議:「爾後關於 本縣農業區所有違規行為,本府農 業發展局應至現場勘查及瞭解,並 根據相關規定負起目的事業主管機 關責任,輔導農民合法化,如無法 合法化,須用正式公文函請土地所 有權人恢復原狀;通知限期改善, 再移請其他機關依據相關法令規定 辦理」,未來農地違規使用認定管 制相關業務,移由農業發展局主政 辦理。同年4 月18 日黃宏斌副縣 長召開「農地違規案件處理流程及 原則」,確認非實際從事農業經營 使用違規態樣,由各態樣行為之目 的事業主管機關依權責辦理輔導改 善及恢復原狀相關事宜,會後並指 示:「農業發展局研擬之疑似農地 違規案件處理流程,請補充加註發 文對象後,連同處理原則,簽奉縣 長核准(請加會葉副縣長辦公室) 」該局於同年5 月1 日主簽,有關 農地違規案件處理流程及處理原則 ,會辦副縣長葉世文及副縣長黃宏 斌,後由縣長吳志揚5 月5 日批示 :可,請於主管會議中報告。並奉 准依據上開方式辦理。103 年5 月 13 日農業發展局(承辦張甄晏)函 (註40)知各單位,有關農地疑似 違規使用案件受理,農業發展局先 至現場勘查及瞭解並就實際從事農 業經營使用之農民,予以輔導其合 法使用農地,另就非實際從事農業 經營使用違規態樣,由各態樣行為 之目的事業主管機關依權責辦理輔 導改善及恢復原狀相關事宜,並將 輔導結果函復該局予以彙整續辦, 依有關「桃園縣政府各類型農地疑 似違規處理原則及桃園縣政府農地 利用案件處理流程」辦理輔導改善 及恢復原狀相關事宜。農業發展局 於103 年5 月15 日桃園縣第691 次主管會議中,提出現行農地違規 使用稽查取締引起廣大民怨之檢討 改善報告,經縣長吳志揚(主席) 裁示:請各機關依修正後之處理流 程表及處理原則辦理,切勿推卸。 並於103 年5 月27 日由縣府(承 辦黃怡禎)以府秘文字第1030117 365 號函知各單位:務必落實執行 。據此,該府於103 年5 月後改以 「輔導」方式,處置農地違規使用 問題。 (三)農業發展局對於本案農地違規使用 之輔導管理過程如下: 1.102 年8 月20 日城鄉發展局(
監察院公報【第3058 期】 ‧27‧ 承辦林國強)府城行字第10202 07428 號函請農業發展局針對農 業區(中正段434、437、438 及 442 等地號)興建建築物認定有 無妨礙農業生產情形,農業發展 局於102 年8 月21 日(承辦張 甄晏)函(註41)復城鄉發展局 ,有關新屋鄉中正段434、437、 438、442 地號興建建築物供營業 用已非符農業使用行為,另依農 業發展條例第69 條規定,農業 用地違反區域計畫法或都市計畫 法土地使用分區管制規定者,應 依區域計畫法或都市計畫法規定 處理,請城鄉發展局逕依權責核 處。 2.103 年5 月30 日城鄉發展局以桃 城行字第1030010029 號(承辦 林國強)函請農業發展局針對新 屋鄉中正段434-439、442 地號 請依權責輔導合法使用,如經輔 導仍屬違規使用者,再行將「輔 導紀錄」及相關事證送城鄉局辦 理後續裁處事宜。並要求農業發 展局依研考會103 年3 月17 日 研商會議討論事項一決議(二): 「爾後關於本縣農業區所有違規 行為,本府農業發展局應至現場 勘查及瞭解,並根據相關規定負 起目的事業主管機關責任,輔導 農民合法化,如無法合法化,須 用正式公文函請土地所有權人恢 復原狀;通知限期屆滿未改善, 再移請其他機關依據相關法律規 定辦理」,請該局依據前開程序 辦理輔導合法。 3.103 年8 月15 日農業發展局( 承辦張甄晏)以桃農管字第 1030017071 號函土地所有權人 劉○○稱:其於農地(434、437 、438、442 地號土地)上興建 建築物做保齡球館等營業使用, 非符農地農用,請於103 年11 月 20 日前取得合法設立使用文件或 恢復農業使用狀態,倘逾期未檢 附合法設立供核或未恢復農業使 用狀態,將依農業發展條例第69 條規定,移由都市計畫主管機關 核處(並副知工商發展局、工務 局、體育處協助輔導合法使用) 。另因其違規使用土地中有3 筆 (中正段435、436、439 地號) 係屬都市計畫住宅區,農業發展 局103 年8 月15 日以桃農管字 第10300170711 號函請城鄉發展 局依權責核處。惟城鄉發展局( 承辦林國強)於103 年8 月21 日 再次發文農業發展局,函請該局 依權責「輔導」合法使用,如經 「輔導」仍屬違規使用者,再行 將「輔導紀錄」及相關事證送城 鄉局辦理後續裁罰事宜。103 年 12 月2 日農業發展局辦理現勘, 發現新屋保齡球館仍違反農業使 用未改善,於103 年12 月4 日 再以桃農管字第1030026368 號 函移請城鄉發展局依法核處。惟 遲至新屋保齡球館火災發生當日 ,都市發展局(原城鄉發展局) 始以104 年1 月20 日府都行字 第1040016307 號裁處書裁罰7 萬元。
監察院公報【第3058 期】 ‧28‧ (四)本院詢問時,農業發展局承辦張甄 晏稱:依103 年5 月15 日會議結 論的處理原則辦理,由各目的事業 主管機關輔導合法。我們不是目的 事業主管機關,沒有辦法輔導。農 地設施是有機會輔導合法化,但其 他設施非農業單位,縣府其實沒有 單位去辦理,報上來就做,當初我 來看這個案子,工廠相對較嚴重, 輔導成功案例很少。隔那麼久才履 勘是因人力不足等語。科長黃玉詩 稱:農地輔導合法化是上面的意思 ,是研考會發動,3.17 是葉副縣長 召開,後續流程係由黃副縣長指示 來訂定流程,當時記得沒有正式會 議,用郵件要求我們來訂定,由我 們擬定後提主管會議後裁示後辦理 。城鄉發展局沒有處理,他們是請 違規人來陳述意見,裁處是由都發 局來處理。我們案件很多,也不會 針對個案。後來他們再要求我們用 輔導方式。那段時間各單位都把案 件都丟回來給農業發展局處理,案 件有1,000 多件,須排程後且到現 場去看後再辦理。如果沒有合法化 ,目的事業主管機關應要求所有權 人恢復原狀。分層負責明細表中農 地部分是由科長來決行,大的政策 則由局長決行等語。局長曾榮鑑稱 :因百姓及民意一直反映才有農地 輔導合法化,二位副縣長提及有這 個問題,所以要去處理,當時會議 是葉副縣長主持。輔導合法化我的 認知,都市土地及非都土地有一定 的管理單位,農地單位只有被動的 被要求,與農業有關的由農業發展 局輔導,與農業無關的當然要移給 目的事業主管機關等語。上開陳詞 顯示,農業發展局對於本案建物所 在農地之違法使用問題,顯然無法 輔導使其合法化。 (五)有關城鄉局是否輔導農地違規使用 問題,本院詢問時,城鄉局局長吳 啟民稱:農地輔導是民意代表的反 映,當時係經黨團會議後由議員反 映才開始。由主管單位去輔導。 103 年5 月由農業發展局訂輔導原 則,城鄉局不是農地主管機關,非 由城鄉局辦理輔導。違規態樣的認 定是要由目的事業主管機關來辦理 。建物的使用違規態樣要由建管部 分認定,農業區部分要看其規定, 本案農地違建應該是不行輔導合法 化等。依此陳詞,城鄉局認為其非 農地主管機關,本案非由城鄉局辦 理輔導,且本案農地違建應該無法 輔導使其合法化。 (六)有關工務局是否輔導農地乙節,本 院詢問時,工務局局長朱惕之答: 我沒有看到103 年5 月13 日之農 業發展局函文,該函有提及縣內農 地非農用情形,該函應係通案,本 案我任內沒有輔導等語。代理局長 郭振寰稱:本案我任內沒有輔導等 語。依此陳詞,工務局並未輔導農 地違規使用問題。 (七)綜上,桃園縣政府農業局依103 年 3 月17 日葉世文副縣長召開之會 議中所做決議,及同年4 月18 日 黃宏斌副縣長召開會議後所做指示 ,做成農地違規案件處理流程及處 理原則,經縣長吳志揚批示核可後
監察院公報【第3058 期】 ‧29‧ ,於103 年5 月13 日(承辦張甄 晏)函知各單位,有關農地疑似違 規使用案件,農業局先至現場勘查 予以輔導其合法使用農地,非實際 從事農業經營使用違規態樣由該態 樣目的事業主管機關依權責辦理輔 導改善及恢復原狀相關事宜。該局 知悉本案建物坐落農地違法做為新 屋保齡球館等營業使用,且明知該 農地不能取得合法設立使用文件, 無法輔導使其合法化,卻於103 年 8 月15 日發函請土地所有權人於 103 年11 月20 日前取得合法設立 使用文件或恢復農業使用狀態,並 副知工商發展局、工務局、體育處 協助輔導合法使用;該局遲至103 年12 月2 日始辦理現勘,於103 年12 月4 日移請城鄉發展局依法 核處,據此,新屋保齡球館於104 年1 月20 日發生火災,承辦張甄 晏、科長黃玉詩,局長曾榮鑑督導 不周即有違失。 八、桃園縣政府消防局新屋分隊分隊長吳 尚城及小隊長謝建勝於100 年7 月間 ,告訴該隊隊員林文智就該保齡球館 之消防安全設備檢查勿如實登載、應 該要放水。此後,隊員林文智、莊翔 智、彭安宗、賴俊鋐及吳尚城、謝建 勝,雖明知自100 年6 月3 日至103 年6 月30 日止,該保齡球館前後共 6 次委託專門技術人員檢查並提出「 消防安全設備檢修申報書」,均記載 滅火器、室內消防栓設備、自動撒水 設備、火警自動警報設備、緊急廣播 設備、消防專用蓄水池等6 項目持續 存在多項相同缺失,從未進行改善, 卻分別自100 年7 月29 日起至103 年7 月24 日止辦理消防安全檢查或 複查時,各自在「桃園縣政府消防局 第二大隊新屋分隊消防安全檢查紀錄 表」、「桃園縣政府消防局第二大隊 新屋分隊消防安全設備檢修申報複查 紀錄表」上,由林文智、莊翔智、彭 安宗或賴俊鋐就上開項目均勾選合格 並在檢查人員欄處蓋章,由吳尚城或 謝建勝在主管核閱欄處蓋章後,將上 開紀錄表置放於新屋分隊存查,使該 館管理權人不須改善缺失即可繼續營 業,免於支付改善缺失所需費用。嗣 該保齡球館於103 年12 月5 日提出 「消防安全設備檢修申報書」仍記載 上開6 項目存在相同缺失。林文智等 6 人之上開違失行為,不僅因涉犯偽 造文書及圖利罪嫌而經桃園地檢署檢 察官提起公訴在案,且造成104 年1 月20 日發生本件火災時,因火災自 動警報設備、緊急廣播設備、自動灑 水設備未發生作用而未能快速查覺、 熄滅火災,1 樓住戶對火災發生渾然 不知,直到濃煙冒出屋外才由鄰居報 警處理,核有嚴重違失。該府消防局 對於「檢修申報結果一再不合格,複 查結果一再合格」問題未能列管,致 新屋消防分隊消防安檢放水情事長期 存在,安檢流於形式,顯有違失。 (一)99 年5 月19 日修正之消防法第6 條第1、2 項規定:「本法所定各 類場所之管理權人對其實際支配管 理之場所,應設置並維護其消防安 全設備;場所之分類及消防安全設 備設置之標準,由中央主管機關定 之(第1 項)。消防機關得依前項
監察院公報【第3058 期】 ‧30‧ 所定各類場所之危險程度,分類列 管檢查及複查(第2 項)。」第7 條第1 項規定:「依各類場所消防 安全設備設置標準設置之消防安全 設備,其設計、監造應由消防設備 師為之;其裝置、檢修應由消防設 備師或消防設備士為之。」96 年1 月3 日修正之第9 條第1 項本文規 定:「依第6 條第1 項應設置消防 安全設備場所,其管理權人應委託 第8 條所規定之消防設備師或消防 設備士,定期檢修消防安全設備, 其檢修結果應依限報請當地消防機 關備查;消防機關得視需要派員複 查。」99 年5 月19 日修正之第37 條規定:「違反第6 條第1 項消防 安全設備、第4 項住宅用火災警報 器設置、維護之規定或第11 條第1 項防焰物品使用之規定,經通知限 期改善,逾期不改善或複查不合規 定者,處其管理權人新臺幣6 千元 以上3 萬元以下罰鍰;經處罰鍰後 仍不改善者,得連續處罰,並得予 以30 日以下之停業或停止其使用 之處分(第1 項)。規避、妨礙或 拒絕第6 條第2 項之檢查、複查者 ,處新臺幣3 千元以上1 萬5 千元 以下罰鍰,並按次處罰及強制執行 檢查、複查(第2 項)。」 (二)98 年11 月27 日修正之「各類場 所消防安全設備檢修及申報作業基 準」第一篇第5 點第1 項規定:「 管理權人申報其檢修結果之期限, 其為各類場所消防安全設備設置標 準規定之甲類場所者,每半年1 次 ,即每年6 月30 日及12 月31 日 前申報……。」92 年9 月24 日發 布之「消防機關受理消防安全設備 檢修申報及複查注意事項」,關於 檢修申報受理作業,一(三)1 規定 :「受理申報時,應查核消防安全 設備檢修申報書、表等相關文件( 管理權人如委託他人辦理申報時, 應檢附委託書),並填具『消防安 全設備檢修申報受理單』(如附件 二)一式二份,蓋章受理後,一份 自存,一份交付管理權人或受委託 人。經查核申報資料不合規定者, 應將不合規定項目詳為列舉,一次 告知補正或改善。」關於複查作業 ,二(四)本文規定:「進行複查作 業應依『消防機關辦理消防安全檢 查注意事項』辦理。專業性複查時 ,應以查閱檢修報告書、詢問及實 地測試等方式,執行下列事項,以 瞭解消防設備師(士)有無不實檢 修情事,並製作消防安全設備檢修 申報複查紀錄表,複查結果列入管 制。」 (三)經查新屋保齡球館(原亞洲保齡球 館)係屬各類場所消防安全設備設 置標準第12 條所規定之甲類場所 ,依上開規定,其管理權人劉得斌 每半年應委託消防法第8 條所規定 之消防設備師或消防設備士,實施 檢修消防安全設備,其檢修結果應 製作消防安全設備檢修申報書及改 善計劃書,報請當地消防機關即桃 園縣政府(已改制為桃園市政府) 消防局新屋分隊備查,消防機關依 「消防機關受理消防安全設備檢修 申報及複查注意事項」應就消防安
監察院公報【第3058 期】 ‧31‧ 全設備檢修申報書之申報內容進行 複查,以查核消防設備師(士)有 無不實檢修情事,若場所管理權人 未依規定設置、維護其消防安全設 備,依消防法第37 條第1 項規定 ,經通知限期改善,逾期不改善或 複查不合規定者,處其管理權人6 千元以上3 萬元以下罰鍰,經處罰 鍰後仍不改善者,得連續處罰,並 得予以30 日以下之停業或停止其 使用之處分。 (四)新屋保齡球館管理權人委託消防設 備師(士)檢修申報及新屋分隊辦 理安檢情形如下:
檢修申報 (複查)日 設備師(士)檢修申報 新屋分隊消防安全檢查 專技人員 (案件聯絡) 改善計畫書摘要 核章人 安全檢查結果 98.06.16
王欽楷 謝建勝 消防設備,合格。 98.07.14
王欽楷 金玉振 消防設備,合格。 99.01.15
林文智 春節專案,計於「滅火器、 火警自動警報設備、防火管 理」勾選符合。 99.07.09(註 42) (99.07.06 檢 查) 胡志偉設備士 (林勝國) 99 年上半年檢修申報 ,缺失如改善計畫書 所載(註43)。
- 07.30
林文智 吳尚城 計於「滅火器、火警自動警 報設備、緊急廣播設備及防 火管理」勾選符合。 99.08.11
林文智 吳尚城 計於「滅火器、室內外消防 栓設備、火警自動廣播設備 、緊急廣播設備、出口標示 燈、避難方向指示燈、緊急 照明設備及防火管理」勾選 符合。 99.10.22 (99.10.21 檢 查) 徐維淂設備士 (林勝國) 99 年下半年檢修申報 ,消防主系統缺失( 註44),與前次申報 同。
99 年下半年檢修申報。
監察院公報【第3058 期】 ‧32‧ 檢修申報 (複查)日 設備師(士)檢修申報 新屋分隊消防安全檢查 專技人員 (案件聯絡) 改善計畫書摘要 核章人 安全檢查結果 99.12.23
林文智 吳尚城 計於「出口標示燈、避難方 向指示燈、緊急照明設備及 防火管理」勾選符合。
100.03.23
林文智 吳尚城 勾選「室內消防栓設備:幫 浦組件故障、火警自動警報 設備:受信總機故障、緊急 廣播設備:預備電池故障」 。開立限改單038175。 100.05.18
林文智 吳尚城 故障情形,同100.03.23 檢 查結果,迄未改善,開限改 單。開立裁罰單,100.06.03 裁罰1 萬2 千元。 100.06.03 舉發違反消防法案件通知單 (編號006003) 100.06.07 (100.06.03 檢查) 徐維淂設備士 (林勝國) 100 年上半年檢修申 報,所列消防主系統 缺失(註45 ),與 99.10.21 檢查、99.10. 22 申報同。
- 07.29
林文智 吳尚城 於「滅火器、室內外消防栓 設備、火警自動警報設備、 緊急廣播設備、出口標示燈 、避難方向指示燈、緊急照 明設備及防火管理」勾選符 合(註46)。 101.01.03
莊翔智 吳尚城 設備「符合」欄均未勾選, 備註:100 年未檢修申報。 101.02.13 (101.02.09 檢查) 蘇進發設備師 (林勝國) 100 年下半年檢修申 報,所列缺失(註47 ),與前次申報同。
監察院公報【第3058 期】 ‧33‧ 檢修申報 (複查)日 設備師(士)檢修申報 新屋分隊消防安全檢查 專技人員 (案件聯絡) 改善計畫書摘要 核章人 安全檢查結果 101.02.15
莊翔智 吳尚城 新屋分隊消防安全檢查紀錄 表,全部空白,各設備符合 欄均未勾選。但備註欄:「 檢修申報,複查符合」。 101.06.21 (101.11.20 檢查) 胡志偉設備士 (林勝國) 101 年上半年檢修申 報缺失(註48),與
前次申報同。
- 07.01
莊翔智 吳尚城 消防安全檢查紀錄表,計於 「滅火器、防焰規劃、火警 自動警報設備、緊急廣播設 備、發電機、出口標示燈、 避難方向指示燈、緊急照明 設備及防火管理」,勾選符 合。消防安全設備檢修申報 複查紀錄表(101.07.15,莊 翔智)。 101.07.07
莊翔智 吳尚城 計於「滅火器、火警自動警 報設備、緊急廣播設備、發 電機、出口標示燈、避難方 向指示燈、緊急照明設備及 防火管理」勾選符合。 101.10.11
莊翔智 吳尚城 備註:101 年未依規定委託 消防專技術人員或專業檢修 機構檢修消防設備。 101.10.25
莊翔智 謝建勝 計於「滅火器、室內外消防 栓設備、火警自動警報設備 、緊急廣播設備、緊急電源 、出口標示燈、避難方向指 示燈、緊急照明設備及防火 管理」勾選符合。 101.11.21 (101.11.20 檢查) 蘇進發設備師 (林勝國) 101 年下半年申報缺 失(註49),與前次 申報同。
監察院公報【第3058 期】 ‧34‧ 檢修申報 (複查)日 設備師(士)檢修申報 新屋分隊消防安全檢查 專技人員 (案件聯絡) 改善計畫書摘要 核章人 安全檢查結果 101.12.22
莊翔智 吳尚城 消防安全檢查紀錄表,計於 「滅火器、火警自動警報設 備、緊急廣播設備、發電機 、出口標示燈、緊急照明設 備及防火管理」勾選符合。 101.12.22,消防安全設備檢 修申報複查合格(莊翔智)。 102.02.05
彭安宗 (註50) 吳尚城 消防安全檢查紀錄表,計於 「滅火器、室內外消防栓設 備、自動撒水設備、防焰規 劃、火警自動警報設備、緊 急廣播設備、出口標示燈、 避難方向指示燈、緊急照明 設備、連結送水管、消防專 用蓄水池」勾選符合,另備 註:複核符合防火管理限改 047938。 102.02.05 消防安全設備檢 修申報複查合格(彭安宗, 對應101 年下半年檢修申報 )。 102.04.11
彭安宗 吳尚城 101 年下半年檢修申報,未 申報。 消防安全檢查紀錄表備註: 「2013 年上半年檢修申報未 依規定委託專業技術人員或 專業檢修機構檢查消防設備 ,開立052953 限改單」。 102.05.15 (102.05.14 檢查) 蘇進發設備師 (林勝國) 室內消防栓,加壓送 水裝置無法持壓,無 法實施性能測試;自 動撒水馬達控制盤線 路故障,無法進行相
監察院公報【第3058 期】 ‧35‧ 檢修申報 (複查)日 設備師(士)檢修申報 新屋分隊消防安全檢查 專技人員 (案件聯絡) 改善計畫書摘要 核章人 安全檢查結果 關測試;火警自動警 報第1L~5L 火災誤 報,迴路拆除等。 102.06.28
彭安宗 吳尚城 因室內消防栓設備無法持壓 等,開立編號052978 限期 改善通知單。 102.07.02
彭安宗 吳尚城 102 年暑期青春專案檢查,計 於「滅火器、出口標示燈及 緊急照明設備」勾選符合。 102.07.02 消防安全設備檢 修申報複查合格(彭安宗, 對應102 年上半年檢修申報 )。 102.12.22
備註:102 年下半年 未申報 彭安宗 (註51) 吳尚城 春節人潮眾多場所專案檢查 ,計於「滅火器、室內外消 防栓設備、自動撒水設備、 防焰規劃、火警自動警報設 備、緊急廣播設備、發電機 、出口標示燈及避難方向指 示燈、緊急照明設備、連結 送水管、消防專用蓄水池」 勾選符合。 102.12.22 消防安全設備檢 修申報複查合格(彭安宗, 對應102 年上半年檢修申報 )。 103.01.10
彭安宗 (註52) 吳尚城 春節人潮眾多場所專案檢查 ,於「滅火器、室內外消防 栓設備、自動撒水設備、防 焰規劃、火警自動警報設備 、緊急廣播設備、發電機、 出口標示燈及避難方向指示 燈、緊急照明設備、連結送
監察院公報【第3058 期】 ‧36‧ 檢修申報 (複查)日 設備師(士)檢修申報 新屋分隊消防安全檢查 專技人員 (案件聯絡) 改善計畫書摘要 核章人 安全檢查結果 水管、消防專用蓄水池」勾 選符合。 103.01.14
彭安宗 吳尚城 開立限改058164 號,2013 年下半年未實施自衛消防編 組訓練,開立058164 號限 改單。 103.02.19
賴俊鋐 備註:防火管理複查符合。 103.07.03 (103.06.30 檢查) 蔡馨怡設備士 (林勝國) 室內消防栓,加壓送 水裝置無法持壓,無 法實施性能測試;自 動撒水馬達控制盤線 路故障,無法進行相 關測試;火警自動警 報第1L~5L 火災誤 報,迴路拆除等。
- 07.24
賴俊鋐 湯佳興 青春專案,計於「滅火器、 室內外消防栓設備、火警自 動警報設備、緊急廣播設備 、發電機、出口標示燈、緊 急照明設備」勾選符合。 103.07.24 消防安全設備檢 修申報複查紀錄表(賴俊鋐 ,對應103 年上半年檢修申 報)。 103.12.08 (103.12.05 檢查) 吳昌桂設備士 (林勝國) 室內消防栓,加壓送 水裝置無法持壓,無 法實施性能測試;自 動撒水馬達控制盤線 路故障,無法進行相 關測試;火警自動警 報第1L~5L 火災誤 報,迴路拆除等。
監察院公報【第3058 期】 ‧37‧ (五)經查新屋分隊隊員林文智、莊翔智 、彭安宗及賴俊鋐、分隊長吳尚城 、小隊長謝建勝均知悉新屋保齡球 館依各類場所消防安全設備設置標 準規定,應設置滅火器、室內消防 栓設備、自動灑水設備、火警自動 警報設備、緊急廣播設備、標示設 備、緊急照明設備、消防專用蓄水 池等,且該保齡球館之上開消防安 全設備設置項目均有缺失,其在辦 理安檢業務時,竟為下列違失行為: 1.林文智於100 年3 月23 日至新 屋保齡球館進行消防安全檢查時 ,查知該處在室內消防栓設備之 幫浦組件故障、火警自動警報設 備之受信總機故障、緊急廣播設 備之預備電池故障,即如實登載 於「桃園縣政府消防局第二大隊 新屋分隊消防安全檢查紀錄表」 ,並開立限期改善通知單(一)( 註53);林文智於100 年5 月18 日至上址檢查時,上開缺失仍無 改善,林文智再如實登載於「桃 園縣政府消防局第二大隊新屋分 隊消防安全檢查紀錄表」,並開 立限期改善通知單(二)(註54) 、舉發違反消防法案件通知單( 一)。該場所管理權人劉○○仍 未依限改善,遭桃園縣政府於 100 年6 月3 日處12,000 元罰鍰 。100 年7 月間,吳尚城告訴林 文智就新屋保齡球館之消防安全 設備檢查情形切勿再如實登載, 謝建勝告訴林文智新屋保齡球館 之消防安全檢查應該要放水。嗣 林文智於100 年7 月29 日至新 屋保齡球館進行消防安全設備檢 查時,明知該場所:室內消防栓 設備之幫浦組件故障、火警自動 警報設備之受信總機故障、緊急 廣播設備之預備電池故障,卻在 「桃園縣政府消防局第二大隊新 屋分隊消防安全檢查紀錄表」上 ,就上開項目均勾選合格,並在 檢查人員欄處蓋章,表示已就上 開消防設備檢查完畢。吳尚城明 知上開登載不實情事,仍在主管 核閱欄處蓋章,表示核可上開消 防安全檢查紀錄表後,此消防安 全檢查紀錄表置放於新屋分隊存 查。因此,新屋保齡球館管理權 人有恃無恐,就上開消防設備故 障情事置之不理,從未修繕,使 其不須改善缺失即可繼續營業, 免於支付改善缺失所需費用之不 法利益。 2.莊翔智、謝建勝、吳尚城均明知 新屋保齡球館有消防安全設備缺 失情形,卻為下列行為:1.莊翔 智於101 年7 月1 日進行消防安 全檢查時,在「桃園縣政府消防 局第二大隊新屋分隊消防安全檢 查紀錄表」,就滅火器、火警自 動警報設備、緊急廣播設備、發 電機、出口標示燈、避難方向指 示燈、緊急照明設備等項目勾選 合格。同時在「桃園縣政府消防 局第二大隊新屋分隊消防安全設 備檢修申報複查紀錄表」上,就 室內外消防栓設備登載:於1 樓 進行放水試驗,瞄子出水壓力 1.7kg/cm2 ,就火警自動警報設
監察院公報【第3058 期】 ‧38‧ 備登載:於1 受信總機進行測試 ,於1F 進行警鈴音響測試,音 壓為92 分貝,於1F 對探測器進 行動作試驗,測試結果符合。2. 莊翔智於101 年7 月7 日進行消 防安全檢查時,在「桃園縣政府 消防局第二大隊新屋分隊消防安 全檢查紀錄表」,就滅火器、室 內外消防栓設備、火警自動警報 設備、緊急廣播設備、發電機、 出口標示燈、避難方向指示燈、 緊急照明設備等項目勾選合格。 3.莊翔智於101 年10 月25 日進 行消防安全檢查時,卻在「桃園 縣政府消防局第二大隊新屋分隊 消防安全檢查紀錄表」,就滅火 器、室內消防栓設備、火警自動 警報設備、緊急廣播設備、標示 設備、緊急照明設備等項目勾選 合格。4.莊翔智於101 年12 月 22 日進行檢修申報複查時,卻 在「桃園縣政府消防局第二大隊 新屋分隊消防安全設備檢修申報 複查紀錄表」,就滅火器登載: 抽查1 樓滅火器2 支、室內消防 栓設備登載:於1 樓進行放水試 驗,瞄子出水壓力1.7kg/cm2、 火警自動警報設備登載:於1 受 信總機進行測試,於1F 進行警 鈴音響測試,音壓為92 分貝, 於1F 對探測器進行動作試驗、 緊急廣播設備登載:於1F 進行 音壓測試,測試結果90dB,測 試結果符合規定,並在上開紀錄 表檢(複)查人員欄處蓋章。吳 尚城則在主管核閱欄處以分隊長 代理人身分蓋章(101.10.25 謝建 勝以分隊長身分代理),表示核 可上開消防安全檢查紀錄表。上 開紀錄表均置放於新屋分隊存查 ,使新屋保齡球館之管理權人不 須改善缺失即可繼續營業,免於 支付改善缺失所需費用之不法利 益。 3.彭安宗、吳尚城明知新屋保齡球 館消防安全設備缺失情形,彭安 宗卻為下列行為:(1)於102 年 2 月5 日進行消防安全檢查時, 在「桃園縣政府消防局第二大隊 新屋分隊消防安全設備檢修申報 複查紀錄表」上,就室內消防栓 設備中登載:於2 樓進行放水試 驗,瞄子出水壓力2kg/cm2;於 自動警報設備登載:於2 樓受信 總機進行測試,於2 樓進行警鈴 音響測試,音壓為92 分貝,於 2 樓對探測器進行動作試驗符合 規定;於緊急廣播設備登載:於 2 樓進行音壓測試,測試結果符 合規定。(2)於102 年7 月2 日 進行暑期青春專案檢查時,就滅 火器、出口標示燈、緊急照明設 備項目勾選合格,同時在「桃園 縣政府消防局第二大隊新屋分隊 消防安全設備檢修申報複查紀錄 表」上,就滅火器登載:抽查2 樓滅火器2 支。(3)於102 年12 月22 日進行消防安全檢查時, 在「桃園縣政府消防局第二大隊 新屋分隊消防安全檢查紀錄表」 上,就滅火器、室內消防栓、自 動灑水設備、火警自動警報設備
監察院公報【第3058 期】 ‧39‧ 、緊急廣播設備、標示設備、緊 急照明設備、消防專用蓄水池等 8 項目全勾選合格,同時在「桃 園縣政府消防局第二大隊新屋分 隊消防安全設備檢修申報複查紀 錄表」上,就室內消防栓設備中 登載:於2 樓進行放水試驗,瞄 子出水壓力2.3kg/cm2;火警自動 警報設備登載:於2 樓受信總機 進行測試,於2 樓進行警鈴音響 測試,音壓為92 分貝,於2 樓 對探測器進行動作試驗符合;於 緊急廣播設備登載:於2 樓進行 音壓測試,測試結果符合。4.於 103 年1 月10 日進行消防安全檢 查時,在「桃園縣政府消防局第 二大隊新屋分隊消防安全檢查紀 錄表」,就滅火器、室內消防栓 設備、自動灑水設備、火警自動 警報設備、緊急廣播設備、標示 設備、緊急照明設備、消防專用 蓄水池等8 項目全勾選合格,並 均在上開紀錄表之檢(複)查人 員欄處蓋章,表示已就上開消防 設備檢查完畢。吳尚城則在上述 文書主管核閱欄處蓋章,表示核 可上開紀錄表。上開紀錄表均置 放於新屋分隊存查,使新屋保齡 球館之管理權人不須改善缺失即 可繼續營業,免於支付改善缺失 所需費用之不法利益。 4.賴俊鋐明知該場所消防安全設備 缺失情形,於103 年7 月24 日 進行消防安全檢查時,在「桃園 縣政府消防局第二大隊新屋分隊 消防安全檢查紀錄表」上,在滅 火器、室內消防栓設備、自動灑 水設備、火警自動警報設備、緊 急廣播設備、標示設備、緊急照 明設備等項目全勾選合格,同時 在「桃園縣政府消防局第二大隊 新屋分隊消防安全設備檢修申報 複查紀錄表」上,就室內消防栓 設備中登載:於2 樓進行放水試 驗,瞄子出水壓力1.7kg/cm2,於 火警自動警報設備登載:於2 樓 受信總機進行測試,於2 樓進行 警鈴音響測試,音壓為91 分貝 ,於2 樓對探測器進行動作試驗 ;於緊急廣播設備登載:於2 樓 進行音壓測試,測試結果良好, 並均在上開紀錄表檢查人員欄處 蓋章,表示已就上開消防設備檢 查完畢後,上開紀錄表,即均置 放於新屋分隊存查,使新屋保齡 球館之管理權人不須改善缺失即 可繼續營業,免於支付改善缺失 所需費用之不法利益。 (六)上開事實,經本院向桃園地檢署調 閱卷宗查明結果,林文智、莊翔智 、彭安宗及賴俊鋐於桃園市調查處 調查時及桃園地檢署偵訊時均坦承 不諱,吳尚城、謝建勝亦調查及偵 訊時均坦承在上開紀錄表上核章等 事實,林文智且於偵查中具結證述 吳尚城、謝建勝曾請其不要如實登 載以免劉○○再受處罰之事實,並 經證人即受劉○○委託檢修安全設 備之專門技術人員徐維淂、蘇進發 、胡志偉、蔡馨怡、吳昌桂及接洽 人林勝國於偵查中結證明確,且有 改善通知單、裁處書、估價單及歷
監察院公報【第3058 期】 ‧40‧ 次之檢查紀錄表、複查紀錄表、檢 修申報書於偵查卷內可稽,可信為 真實。本院106 年8 月30 日詢問 時,林文智、莊翔智、彭安宗、賴 俊鋐、吳尚城、謝建勝雖均否認有 登載不實之事實,林文智辯稱:「 (問:……100 年7 月間,吳尚城 分隊長、謝建勝小隊長先後指示您 放水,以上是否正確?)沒有,當 時是我臆測的,與事實不符,我應 訊時與實際狀況時已忘記。」、「 (問:到底有沒有人對你關說?) 沒有」、「(問:為何在檢察官那 邊說被施壓?)當初在調查站那邊 有被暗示。」等語;莊翔智辯稱: 「(問:複查紀錄表上都同樣的設 備壞掉?)檢察官只相信消防設備 師士都有檢查,我們去檢查以現場 設備判定」等語;彭安宗辯稱:「 (問:(提示偵查筆錄)為何現在 否認登載不實?)當初答的意思是 所有項目,但檢查規定是抽查,沒 有辦法檢查到細項的部分。我的意 思是抽查沒有辦法到每一個細項。 內容也有提到是時間有限,所以是 抽查方式來做。」、「(問:複查 時應瞭解申報內容有無不實檢修, 應看其內容有無不實?)我是以目 前實際狀況來做檢查,檢查不是以 檢修申報書的為準。」等語;賴俊 鋐辯稱:「(問:有沒有一一檢查 ?)當時沒有所謂的一一檢查,我 們檢查時會看一下檢修申報書,去 實地測試,且去的時候只能抽測, 沒有辦法像設備師士詳細檢查。」 等語;吳尚城辯稱:「(問:如何 確認有缺失已改善?)同仁都依局 規定抽查且複查紀錄表必要項目抽 查且登載其檢查位置情形等。」、 「(問:……新屋分隊隊員指您曾 施壓讓新屋保齡球館通過消防安全 設備,您有何說明?)沒有。這個 部分,他在地院開庭時,表示他被 市調站偵查員的誘導。且事實上我 就沒有去關說,我也不瞭解該場所 好或不好。」等語;謝建勝辯稱: 「(問:林文智表示你曾關心,不 要再勾選不合格,有何說明?)這 部分有答辯過,從來沒有指示過, 且林文智也向庭上表示沒有。」等 語。惟林文智、莊翔智、彭安宗均 未能就其於調查時受不當影響之事 實舉證以實其說,且其等於偵查中 亦坦承犯行,故所辯並無可採。莊 翔智雖辯稱:上開紀錄表係因確實 檢查及複查後始記載合格,消防設 備師(士)之檢修申報書所記載之 缺失不實在云云。惟如前所述,消 防機關依「消防機關受理消防安全 設備檢修申報及複查注意事項」應 就消防安全設備檢修申報書之申報 內容進行複查,以查核消防設備師 (士)有無不實檢修情事,惟林文 智、莊翔智、彭安宗、賴俊鋐、吳 尚城、謝建勝歷次檢查時均無發現 消防設備師(士)有不實檢修情事 ,彭安宗且於本院詢問時承認其並 未依檢修申報書所記載之缺失進行 檢查及複查等語,參以本件火災發 生時,火災自動警報設備、緊急廣 播設備、自動灑水設備等均未發生 作用,致使居住於1 樓之劉得斌對
監察院公報【第3058 期】 ‧41‧ 火災發生渾然不知,直到濃煙冒出 屋外,才由鄰居報警處理,故莊翔 智辯稱其等就本案建物之消防安全 設備均確實檢查才記載合格,消防 設備師(士)之檢修申報書所記載 之缺失不實在云云,亦無足採。林 文智雖稱:吳尚城、謝建勝並未告 訴其不要如實填載云云,惟其於刑 案調查及偵訊中均證稱吳尚城、謝 建勝告訴其不要如實填載等語,且 於偵查中具結所為證言係屬真實, 其於本院詢問時所為上開證詞,顯 係事後迴護之詞,不足採信。退步 而言,倘若其於本院詢問時所為上 開證詞係屬真實,則依法應負偽證 罪責。 (七)綜上,桃園縣政府消防局新屋分隊 分隊長吳尚城及小隊長謝建勝於 100 年7 月間叫該隊隊員林文智就 該保齡球館之消防安全設備檢查勿 如實登載、應該要放水。此後,隊 員林文智、吳尚城、謝建勝及該隊 隊員莊翔智、彭安宗、賴俊鋐等, 雖明知自100 年6 月3 日至103 年 6 月30 日止,該保齡球館前後共6 次委託專門技術人員檢查並提出「 消防安全設備檢修申報書」,均記 載滅火器、室內消防栓設備、自動 撒水設備、火警自動警報設備、緊 急廣播設備、消防專用蓄水池等6 項目持續存在多項相同缺失,從未 進行改善,卻分別自100 年7 月 29 日起至103 年7 月24 日止辦理 消防安全檢查或複查時,各自在「 桃園縣政府消防局第二大隊新屋分 隊消防安全檢查紀錄表」、「桃園 縣政府消防局第二大隊新屋分隊消 防安全檢查紀錄表」上,由林文智 、莊翔智、彭安宗或賴俊鋐就上開 項目均勾選合格並在檢查人員欄處 蓋章,由吳尚城或謝建勝在主管核 閱欄處蓋章後,將上開紀錄表置放 於新屋分隊存查,使新屋保齡球館 之管理權人不須改善缺失即可繼續 營業,免於支付改善缺失所需費用 。嗣該保齡球館於103 年12 月5 日委託專門技術人員檢查所提出「 消防安全設備檢修申報書」上仍記 載上開6 項目存在相同缺失。林文 智等6 人之上開違失行為,構成偽 造文書罪,且造成104 年1 月20 日發生本件火災時,火災自動警報 設備、緊急廣播設備、自動灑水設 備等均未發生作用,致使火災不能 經由火災自動警報設備、緊急廣播 設備、自動灑水設備快速查覺、快 速熄滅,居住於1 樓之劉得斌對火 災發生渾然不知,直到濃煙冒出屋 外,才由鄰居報警處理。桃園地檢 署檢察官亦為相同之認定,對林文 智等6 人以涉犯公務員明知為不實 之事項而登載於職務上所掌之公文 書、貪污治罪條例第6 條第1 項第 4 款對於主管或監督之事務明知違 背法令間接圖其他私人不法利益罪 嫌提起公訴在案,核有嚴重違失。 該府消防局對於「檢修申報結果一 再不合格,複查結果一再合格問題 未能列管,致新屋消防分隊消防安 檢放水情事長期存在,安檢流於形 式,顯有違失。 九、本案建物為大型密閉鐵皮屋,縱深約
監察院公報【第3058 期】 ‧42‧ 75 公尺,後方2 樓設有冷卻水塔平台 ,亦有門可供進入2 樓後方,可作為 直接攻擊火點用,只要使用雙節梯, 不須派員進入室內,即可就近灑水滅 火。救火指揮官湯佳興於抵達火場初 期凌晨2 時09 分即知悉火災起火點 在建物後方,並知悉劉○○已將後門 打開,且於第1 梯次人員撤出,第2 梯次人員尚未進入時,即知悉建物內 受困居民已經全部救出,卻未詢問第 1 梯次入室人員火場狀況,掌握水帶 可否進入有效攻擊位置情形,即貿然 決定,不須派任何人員從建築物後方 外面冷卻水塔或以雙節梯直接攻擊火 點,而派第2、3 梯次人員從前方進 入室內搜救,造成2 時56 分許全面 燃燒後,6 名年輕消防員無法撤出而 殉職,顯有違失。 (一)依桃園縣政府消防局消防工作實務 手冊(註55)第二篇、貳、一、 (六)火災搶救要領與注意事項規 定,「閃燃(Flashover)」,係指 在室內火警初期因溫度逐漸升高而 引起的一種現象。火勢增強時,若 火場內的溫度升至攝氏650 度或以 上時,火場內所有物品已達火燃點 都會自動燃燒,而室內的可燃物質 便會因火勢溫度而分解出可燃性氣 體,過程中所產生的熱氣體便會上 升至天花板而平面擴散,被分解出 來的可燃性氣體再得到足夠的熱量 時便會燃燒,這種全面性的同時燃 燒稱為閃燃。認識閃燃,屬消防人 員之基本素養。 (二)104 年1 月20 日凌晨2 時02 分許 ,桃園市政府消防局救災救護指揮 中心(下稱119 救災救護指揮中心 )接獲民眾報案,指新屋區中興北 路發生火警,遂通知各消防單位前 往救災。轄區新屋分隊接獲119 救 災救護指揮中心(無線電代號:漢 水)通報後,由分隊長湯佳興率( 救火指揮官,代號新屋01)所屬 隊員莊朝涵(駕駛新屋11 水箱車 )、莊翔智(駕駛新屋61 水庫車 )、賴俊鋐(駕駛新屋13 水箱車 )、黃品豪(駕駛新屋92 救護車 )及黃偉鈞(實習生)等6 人,於 凌晨2 時09 分:「救災人車到達 現場,建築物正面未見火煙,現場 關係人(劉○○)表示建築物2 樓 後側機房起火燃燒,有人員受困。 」2 時12 分:「新屋61 部署水線 中繼供水予新屋13 車,新屋01 勘 查建築物後側火勢,回報指揮中心 有濃煙竄出」,此有桃園市政府消 防局「104 年1 月20 日新屋區中興 北路101 號火災搶救報告書」參之 一(火災動態及處置狀況)在卷可 參,足徵救火指揮官湯佳興於凌晨 2 時09 分即知起火點在保齡球館後 方。之後,凌晨2 時13 分許桃園 市政府消防局第二救災救護大隊富 岡分隊(下稱富岡分隊)、新屋分 隊曾重仁(02:23)、林家慶(02 :23)、永安分隊(02:25)、觀 音分隊(02:25)、草漯分隊(02 :30)陸續抵達火災現場。救火指 揮官於2 時30 分許無線呼叫現場 同仁,告知延燒地方在後側,火點 在後面(註56)。2 時41 分許, 新屋01 復以無線呼叫表示火點在
監察院公報【第3058 期】 ‧43‧ 後方沒辦法深入,永安分隊長吳尚 城乃以無線呼叫「建築物的後方靠 近土地公這邊,那業者說有一個通 道可以上去,但是那個通道有點窄 小,只有小水箱車可以進來」。之 後並與新屋01、桃園市消防局特搜 大隊第二特別搜救救助分隊(下稱 二搜)分隊長相偕到建築物後面查 看,「勘查結果認為從後方一樓進 入有危險,所以回到前方」,此有 桃園市消防局119 救災救護指揮中 心通話譯文、湯佳興104 年7 月29 日詢問筆錄可稽。 (三)次查新屋保齡球館係鐵皮搭建之違 章建築,2 樓面積約2,580 平方公 尺、縱深約75 公尺。依本院104 年1 月29 日履勘結果,球館後方 2 樓設有冷卻水塔平台,亦有門可 供進入2 樓後方,足可作為直接攻 擊火點用,對於滅火攻擊自有裨益 。吳尚城於104 年1 月22 日檢方 訊問稱:「接著我就到火場側面走 到後面,一直繞到後面去,去查看 火勢,我就發現後面水塔旁的鐵皮 屋已經燒紅了,然後在我找指揮官 的途中,是在側邊巷內遇到業主劉 ○○,我遇到指揮官後,跟他報告 要破壞後面的門,劉也在旁邊,劉 說不用,他可以從一樓裏面走到後 面去開門,我跟指揮官從巷子走到 後面看,到達後門時,劉已經把後 門打開了,我就發現水塔旁,由樓 梯口往上看,兩側鐵皮燒得通紅, 指揮官知道這情形,說這邊太危險 ,由前面去做搶救,劉就把後門關 起來,指揮官就回到火場正面,我 就去前面確保消防車的水源,連接 消防栓。」詢據湯佳興104 年7 月 29 日詢問筆錄:「後面二樓有鐵 梯及小門,梯子在裡面,那時看有 困難,因為是在正上方,當時沒有 注意冷卻水塔該處空間,且從建物 後面也不知道內部狀況,當時沒有 注意到2 樓冷卻水塔有平台……」 等語,足見救火指揮官湯佳興未能 善加利用保齡球館後方冷卻水塔平 台直接攻擊火點,錯失救災先機。 (四)本院104 年1 月29 日履勘火場, 發現鐵捲門開口約80×85 公分, 面積不到1 平方公尺,消防員透過 此開口佈線入室,除此之外,現場 幾無其他開口。火場初期搶救作為 ,湯佳興於2 時17 分搶救民眾2 人,並切開前方鐵捲門(約2 時18 分),尚屬妥適。惟其明知起火點 在建築物後方,不思從後方直接攻 擊火點,卻從前方佈線入內,所佈 水線長度,104 年1 月24 日富岡 分隊吳東奇於檢察官訊問時稱:「 富岡分隊一行同仁進入後,內部非 常的暗,看不太到,當時是還沒什 麼煙,但是我們沒有看到火點」、 「進去深入的地點,就在鐵捲門附 近」、「基本上就是大概以一條水 帶的長度,差不多20 公尺,在鐵 捲門附近活動」等語。依譯文摘要 ,02:16:43 受困2 人已全部救出( 註57);詢據湯佳興106 年8 月30 日詢問筆錄:「二個人救出時,切 割鐵門時,約02:30」(問:何 時知道起火點在後方?)」等語, 其於2:30 第1 梯次人員撤出,第
監察院公報【第3058 期】 ‧44‧ 2 梯次人員尚未進入時,即知悉起 火點在本案建物後側及該建物內居 民已經離開。其雖辯稱:通往後方 之巷道狹窄,消防車無法進入,且 「晚上視線亦不清楚,當時看不到 水塔那邊有門,也看不出有空間, 晚上也看不到窗戶。」等語。惟湯 佳興亦稱:可以使用雙節梯等語。 另黃鈺翔亦稱:天暗,可以使用手 電筒照明等語。因此,湯佳興所辯 並無足採。 (五)綜上,本案建築後方2 樓設有冷卻 水塔平台,亦有門可供進入2 樓後 方,火災發生時可作為直接攻擊火 點用,只要使用雙節梯登上平台, 不須派員進入室內,即可從後方灑 水滅火。救火指揮官湯佳興於抵達 火場初期(凌晨2 時09 分)即知 悉火災起火點在建物後方,並知悉 劉○○已將後門打開,且於第1 梯 次人員撤出,第2 梯次人員尚未進 入時,即知悉建物內受困居民已經 全部救出,復未詢問第1 梯次入室 人員火場狀況,掌握水帶可否進入 有效攻擊位置情形,即貿然決定, 不須派任何人員從建築物後方外面 冷卻水塔或以雙節梯直接攻擊火點 ,而派第2、3 梯次人員從前方進 入室內搜救,造成2 時56 分許全 面燃燒後,6 名年輕消防員無法撤 出而殉職,顯有違失。 十、救火指揮官湯佳興未依規定於入室搜 索前先登錄管制搜救小組之姓名、人 數、時間及氣瓶壓力,且未指派專人 管制進出,致無人知悉室內救災人數 。其於閃燃前曾8 次要求撤出火場, 在2 樓平台準備入室之二搜曾喊撤退 、撤水線,後方水源因而遭人中斷, 室內人員因水帶扁塌無法循水線逃至 室外,二搜在救出吳東奇、黃鈺翔後 ,誤以為室內無人而率相關人員離開 ,6 名消防員喪失救援機會,湯佳興 實有疏失。 (一)103 年3 月18 日內政部消防署消 署救字第1030600061 號函修正之 「消防機關火場指揮及搶救作業要 點」七、(五)、7 及103 年12 月4 日修正之「桃園縣政府消防局火場 指揮及搶救作業要點(改制後繼續 適用2 年)」七、(五)、7 均規定 :「……(3)由指揮官分配各搜救 小組搜救區域、聯絡信號,入室搜 索前應先登錄管制搜救小組『姓名 』、『人數』、『時間』、『氣瓶 壓力』,每一區域搜索完畢後,需 標註記號,以避免重複搜索或遺漏 搜索。(4)入室搜索,應伴隨水線 掩護,並預留緊急脫離路線。」內 政部消防署「消防人員救災安全手 冊」(94 年8 月第四版)第八章入 室搜救安全注意事項第10 點規定 :「入室搜救,應隨時提高警覺, 遇濃煙影響以致迷失方向,或感覺 到有任何異狀發生情況緊急時,切 不可慌張、急躁,應立即循部署水 帶之反方向或安全確保繩退出火場 」因此,救火指揮官命消防員入室 搜救前,應先登記管制入室搜救小 組之姓名、人數等,並伴隨水線掩 護,預留緊急脫離路線。消防署對 於入室搜救後如何退出火場,亦有 標準作業程序。
監察院公報【第3058 期】 ‧45‧ (二)查104 年1 月20 日凌晨2 時許新 屋保齡球館發生火警,不幸造成永 安分隊陳鳳翔(26 歲 專26 期) 、蔡長融(21 歲 專31 期)、陳 彥茗(22 歲 專31 期)及觀音分 隊張桂彰(22 歲 專30 期)、草 漯分隊謝君杰(29 歲 專24 期) 、新屋分隊曾重仁(27 歲 專26 期)等6 人殉職。新坡分隊隊員黃 鈺翔,係現場全面燃燒最後一位自 火場幸運脫離者,其於104 年1 月 22 日檢察官訊問時稱:「我們在保 齡球道上尋找火點,我們走約七、 八步距離,約保齡球道三分之一位 置,……,當時我不知道我們左側 到房屋最底部還有這麼大的距離, 我問謝君杰說我們要不要往左邊射 ,謝君杰說好,你們往左邊射,他 再照一下,我就往左邊射,但是仍 未看見任何火光,應該是悶燒,後 來衣服有點燙,我記得學校受訓時 ,有說到閃燃溫度很高,煙塵會越 來越低,能見度越來越低,我問謝 君杰說是不是要撤退,他說再等一 下,要我先做準備,隨時準備撤離 。這時我們身上都有無線電,謝君 杰說完話過沒多久後,約一分鐘左 右,水帶突然扁掉,當時我拿著瞄 子,因為重力關係,水會往後退, 瞄子處的水帶會馬上扁掉,停水瞬 間,我從無線電聽到說火勢有竄出 的情勢,外面有火光,請停放撤退 ,停放就是指停止放水(註58), 但我不清楚是請我們最前線的人停 止放水,還是要後方的水箱車停水 ,瞄子也是可以關水的,但我知道 我的瞄子後面的水帶就瞬間扁掉, 謝君杰說快點撤,我們就撈起水帶 ,到障礙物時,我們就摸不到水帶 ,我們要尋求障礙物後方那一段要 摸,但也摸不到,……」、「我們 開始撤退後,我聽到無線電傳來『 撤退,撤退,立刻撤出火場』,此 時是當我們要回頭跨越障礙物當時 聽到的」等語。其於105 年3 月15 日本院詢問時稱:「原本謝君杰學 長擔任瞄子手,後來我從我們左側 聽到霹霹啪啪的聲音,告知謝君杰 學長後,謝君杰學長把瞄子交給我 ,由我擔任瞄子手,而他自己站在 我前方半步以手電筒尋找火源,不 久後,水帶突然扁塌,水帶扁塌是 因後方水源中斷,因重力的關係, 水會往回流至低處,造成高處沒有 水,隨後就聽到無線電發出現場有 火煙竄出,要求現場人員撤出的訊 息,一聽到撤出訊息,謝君杰學長 就大喊趕快撤,我們3 位往後依扁 塌水帶的方向撤出,到一處障礙物 後,因水帶是從障礙物下方穿過去 ,所以我們試圖從障礙物另一方向 找尋下一段水帶,但因水帶扁塌, 造成我們無法輕易辨識水帶在哪裡 ,一直沒有辦法找到下一段,兩位 學長先跨過障礙物後,輪到我要過 去時,因消防鞋被障礙物夾住,我 怕過去時消防鞋會脫落,故先後退 將消防鞋拉出再跨過去,當我跨過 去時,已沒有看到兩位學長,我在 原地大喊學長約15 秒,沒人回應 我後,我依當時進來的方向以低姿 勢尋找出口,儘量去碰牆壁,後來
監察院公報【第3058 期】 ‧46‧ 碰觸牆壁找到一個洞口,但我不清 楚是否為出口,跨出去後本來還想 走進去,此時有一位學長拉住我, 告知我已經出來了,並要帶我下去 。」依此陳述,黃鈺翔強調停水瞬 間「火勢有竄出的情勢,外面有火 光,請停放撤退」,以及回頭跨越 障礙物時聽到之「撤退,撤退,立 刻撤出火場」,均是從無線電聽到 的。依無線電譯文,二搜01 於2 時54 分許向新屋01 回報已撤出, 新屋01 表示「收到」,現場斷水 時間係在全面燃燒之前,斷水原因 與起訴書所稱全面燃燒後因移車需 要切換消防車動力分導器裝置( PTO,Power Take Off Device)無 關。 (三)為查明斷水是否真實,本院調閱警 方密錄影片,並與漢水錄音譯文、 消防員權益促進會提供之97 號鄰 宅監視器交互比對。其中,警方密 錄影片因夜間、現場煙霧及現場民 眾遮住鏡頭而品質不佳,而警方密 錄影片又因電池用盡而僅錄至2 時 52 分17 秒許,致02:53:17 至 02:56 全面燃燒期間之關鍵畫面 付之闕如;另97 號民宅監視器, 則因監視器角度限制,僅能錄到部 分救災畫面,然本院仍逐一紀錄有 關畫面之特徵點,並交互比對,重 建救災現場。其時序確認過程,略 以:首先,比對警方密錄影片與桃 園市政府消防局有線電話錄音,發 現救火指揮官湯佳興於當日02 時 28 分04 秒以其手機與救災救護指 揮中心聯絡,錄音長度19 秒,嗣 因故斷線,該中心於02:28:17 回 撥,雙方通話錄音長度91 秒。扣 除聲控系統為確保錄音完整性而自 動加入之錄音長度(6 秒)後,研 判第2 次實際通聯85 秒,估計其 於02:29:42 結束通話(註59) ,正巧其結束通話之動作,適為警 方密錄影片於02:39:41 時錄下 。本院為確信此唯一能比對二者時 差之關鍵證據是否正確,於105 年 10 月3 日請湯佳興協助檢視警方密 錄影片02:39:41 時是否就是其 結束與漢水通話之時,經湯佳興於 105 年10 月4 日、106 年1 月4 日 確認無誤,本院因此研判警方密錄 影片時間較漢水無線電譯文時間快 約10 分01 秒。至警方密錄影片與 97 號民宅錄影之時差,因二者有部 分共同影像,例如某轎車於警方密 錄影片02:40:39 駛經圍牆轉角 離開現場(對應鄰宅監視器02:49 :09)、新屋分隊莊翔智於警方蒐 證影像02:46:05 自13 車快跑至 61 車(鄰宅監視器02:54:35)、 於警方蒐證影像02:46:15 自61 車快跑至13 車(鄰宅監視器02: 54:45)及警方蒐證影像03:00: 35 某體型微胖男子自火場走出來( 鄰宅監視器影03:09:05),可資 研判鄰宅監視器較警方蒐證影像影 片快約8 分30 秒,析言之,鄰宅 監視器較標準時間快約18 分35 秒 ,與起訴書載稱錄影時間比標準時 間快約19 分鐘相當。上開重建時 序,於105 年12 月交付桃園市政 府消防局,並與該局多次研討,終
監察院公報【第3058 期】 ‧47‧ 獲該局106 年5 月15 日桃消救字 第1060016075 號函復,改按警方 密錄影片畫面02:39:17 時,湯 佳興正巧使用手機通話並走到警方 密錄前方,清楚錄到其講話內容「 還沒有還沒有」,比對該局電話錄 音,於02:29:21 錄到湯佳興與 救災救護指揮中心「還沒有還沒有 」對話,因此可證「警方密錄影片 」較「電話錄音(同無線電錄音) 」快約9 分56 秒,與本院原估計 10 分01 秒相當。另該局比對新屋 分隊隊員林家慶於「警方密錄影片 」02:50:57,以及「97 號鄰宅 監視器」02:59:25 於新屋61 車 與圍牆間甩出第一條水帶落地畫面 ,直接證明「97 號鄰宅監視器」較 「警方密錄影片」快約8 分28 秒 ,亦與本院原估計8 分30 秒相當 。基於一致性考量,本院改依警方 密錄影片較無線電錄音快9 分56 秒,97 號民宅監視器較警方密錄 影片快8 分28 秒校正三者之時差 。其中,水源問題,經查迄2 時56 分全面燃燒前3 分鐘,新屋61 水 庫車仍呈溢水狀態,研判現場尚無 水源不足情形。惟依校正後之時序 ,發現新屋分隊吳朝涵奉二搜01 之 命下樓拿水帶,但02 時49 分許吳 朝涵就將水帶歸還給13 車,並未 將水帶攜至樓上,其原因據吳朝涵 所述,係因為「整個建築物在漂黑 煙,被嗆到」,顯見火場於2 時49 分許就已經有所變化。 (四)惟查火場於2 時56 分許全面燃燒 ,在此之前,除新屋分隊曾重仁係 執行救護任務後自行入室外,前後 計分3 梯次入室搜救。第1 梯次為 新屋分隊賴俊鋐、吳朝涵等2 人因 氣瓶殘壓警報器響而退出,第2 梯 次入室者為富岡分隊簡明倫、楊孟 哲、吳東奇及趙威懿等4 人,第3 梯次則有永安分隊陳鳳翔、蔡長融 、陳彥茗及觀音分隊張桂彰、草漯 分隊謝君杰、新坡分隊黃鈺翔等6 人,各梯次入室前並未實施任務交 接。 1.富岡分隊吳東奇與趙威懿空氣瓶 警報響後,退出更換氣瓶,之後 再入室找分隊長,吳東奇於災後 概述表稱:「再度入室後循水線 與瞄子手等同仁會合,繼續搜索 過程中,仍然感覺不到火點,突 然感覺到四周變的非常熱,當下 直覺煙層下降至脖子了,前方同 仁立即大叫快撤,立即往出口方 向跑,……快到出口時,還是看 不到出口,立即大喊出口在哪, 加上手電筒照射,在出口同仁有 聽到聲音後拉住我的消防衣將我 引導出來」等語。據此陳述,吳 東奇係因再度入室後感覺四周變 得非常熱而決定撤出,並在出口 附近被二搜救出。 2.趙威懿於災後概述表稱:「…… 換完(氣瓶)後我立刻又爬上2 樓,沿著當時我們前進方向上的 水帶企圖找分隊長繼續幫忙他們 ,此時走了大概1 分多鐘,火場 內部濃煙逐漸由灰轉黑,且迅速 累積至伸手不見五指的程度,同 時熱度也急遽上升,我聽見2 樓
監察院公報【第3058 期】 ‧48‧ 平台上的同仁緊急呼喊快撤退, 當時因為無法確認分隊長跟其他 同仁是否還在水線前方,所以我 在當下還愣了幾秒鐘,並呼喊分 隊長,但不見有人回應,而當時 環境越來越惡劣,且周圍不斷有 東西掉落,撤退的命令也越來越 急迫,此時我立即快步離開」、 「退至2 樓平台時還見有三五位 同仁在呼喊撤退,然後也聽到撤 掉水線的指令,此時我想到剛剛 進去時距離鐵皮拉門約4、5 步 的距離時,有看到一具瞄子,聽 到他們說撤水線時,本想由落地 玻璃那側入口進入,但當時濃煙 已大到我不敢再進入,當下立刻 決定丟棄那一線,隨即下樓趕緊 找簡分隊長跟學弟」等語。趙威 懿於104 年1 月24 日檢察官訊 問時稱:「進入後我沒找到分隊 長,我沿著水線走,當時二樓平 台一群人員就喊撤退的指令,… …,後來能見度越來越糟,溫度 越來越高,後面喊撤退的人也越 來越急,因為我進入時候是沿著 水線直行,後來我快步離開火場 ,沒有靠水線引導我出來。」、 「我出來後有看到平台上的人說 要撤水線,撤水線的意思應該是 說要把線上的人和水線一起撤掉 」等語。 3.災後新屋分隊林家慶亦於火災檢 討會概述表證稱:「二搜上來後 ,二搜01 指示我接大轉小雙叉 ,發現溫度過高難以靠近,接著 大量黑煙開始竄出,二搜01 下 令水線撤退,我就跟著一起撤退 。」 (五)依據前述趙威懿、林家慶之陳述, 二搜當時發現火場有變曾下達撤水 線之指令。為此,本院105 年5 月 24 日詢問桃園市政府消防局撤水線 與撤退有何不同,該局應詢書面資 料陳稱:「一、『撤水線』與『撤 退』查無明確定義。經本局研討後 認就本案內部及迫近火場出入口附 近救災人員而言,兩者並無明顯差 別。二、因『撤水線』查無明確定 義,故其『時機』亦查無明確規範 。三、經本局研討後認為撤水線常 見情形有:(一)火場處理完畢。( 二)重新部署改變進攻位置時。(三 )當火場有危險危害消防人員安全 需緊急撤離時,由內部人員研判環 境、時間是否容許拖拉水線一同撤 出。但是須注意當情況危急時,若 試圖帶走這些裝備反而可能導致受 傷。」然依趙威懿於104 年1 月24 日於檢察官訊問時稱:「二搜的人 可能因為火場的情況有轉變他們後 來沒有進入,就留在那裡,後來叫 我們撤退,我出來後有看到平台上 的人有說要撤水線,撤水線的意思 應該是說要把水線上的人和水線一 起撤掉,我當時往裡面還看到瞄子 ,想要去撿。」等語,撤水線就是 把水線上的人和水線一起撤掉,與 消防局所稱撤掉水線與撤退二者無 顯著差別之說法,即有差異。再者 ,富岡分隊吳東奇於104 年1 月24 日檢察官訊問時稱:當不確定火場 裡面是否有人時,外面人應以無線
監察院公報【第3058 期】 ‧49‧ 電呼叫「請裡面的人儘快撤出」, 而非直接下令「撤掉水線」等語( 註60),亦與該局105 年5 月24 日書面意見稱:「當火場有危險危 害消防人員安全需緊急撤離時,由 內部人員研判環境、時間是否容許 拖拉水線一同撤出」等語,並不相 同。加壓水帶拖行不易,係緊急時 引導消防員撤離用,該局所稱「撤 水線與撤退兩者無明顯差別」等語 ,誠有疑義。 (六)當日救災頻道,使用7 號中繼頻道 ,全程均有錄音,黃鈺翔於104 年 1 月22 日檢察官訊問時稱:「停水 瞬間,我從無線電聽到說火勢有竄 出的情勢,外面有火光,請停放撤 退」、「我們開始撤退後無線電傳 來『撤退,撤退,立刻撤出火場』 」等語。湯佳興於104 年1 月24 日 於檢方訊問時稱:「我印象最深, 在我喊撤離之前,二搜分隊長他用 無線電跟我回報,『人員準備進入 』,所以當時我察覺火場外的煙滲 出反應,我非常緊張,立即呼叫『 全員撤出火場』,呼叫第3 次或第 4 次之後,楊肅強分隊長回報『收 到,人員已撤出』,我才比較放心 」等語,惟當日無線電譯文查無前 述二搜分隊長「人員準備進入」等 語。楊肅強於本院106 年8 月30 日 詢問時稱:當日係使用6 號直通頻 道,該頻道沒有錄音,但7 號頻道 可聽到6 號頻道發話等語。參以前 述趙威懿稱:「進入後我沒找到分 隊長,我沿著水線走,當時二樓平 台一群人員就喊撤退的指令,…… 」、「我出來後有看到平台上的人 說要撤水線,撤水線的意思應該是 說要把線上的人和水線一起撤掉」 ,趙威懿稱:「火場內部濃煙逐漸 由灰轉黑且迅速累積至伸手不見五 指的程度,同時熱度也急遽上升, 我聽見二樓平台的同仁緊急呼喊快 撤退,……而當時環境越來越惡劣 ,且周圍不斷有東西掉落,撤退的 命令也越來越急迫,此時我立即快 步離開」、「退至二樓平台時,我 還見三五位同仁在呼喊撤退,然後 也聽到撤掉水線的指令」等語。因 此,黃鈺翔稱其停水瞬間他從無線 電聽到停放撤退,以及其回頭跨越 障礙物時無線電傳來「撤退,撤退 ,立刻撤出火場」等語,並非來自 救火指揮官之無線電,而是來自門 口二搜分隊長之6 號直通頻道,詢 據湯佳興106 年8 月30 日筆錄: 「當天如果用直通,不經過中繼就 沒有錄音。如果用直通確實訊息會 比較好。」(問:用直通會不會比 較好一點?)等語,足徵其當時使 用之中繼頻道通訊狀況不良。 (七)依無線電譯文,湯佳興於02:54 :13 呼叫二搜01,二搜回報人員 已撤出(二搜01 使用6 號頻道, 沒有錄音),回報地點在新屋13 車旁,估計2 時54 分之前,二搜 人員就已經帶黃鈺翔下樓離開2 樓 平台。另本案救火指揮官於02:53 :08 呼叫「你們全部出來,現場濃 煙已經漫出來了」,研判此時大約 就是黃鈺翔所稱「停水瞬間,他從 無線電聽到說有火勢有竄出的情勢
監察院公報【第3058 期】 ‧50‧ 」。至於當時人在火場入口之二搜 人員為何無法精準掌握室內救災人 數,研判由於二搜抵達2 樓平台前 ,殉職人員已先入室,加上救火指 揮官未指派專人管制進出,以及人 員進進出出,如吳東奇、趙威懿二 度入室及曾重仁單獨入室等,均未 向指揮官報備,致二搜雖知當時室 內有二線人員救災,卻對室內救災 人數未加精確掌握,加上現場煙層 下降,天花板出現明顯火光(火羽 流),評估現場已無法入室,終於 在救出吳東奇、黃鈺翔之後,詢問 其有無人員仍在內部,回答已無人 時,誤以為只有這2 個人,率相關 人員離開2 樓平台,內部人員也因 此喪失最後救援之機會。 (八)綜上,本件火災在火場全面燃燒前 ,已有3 梯次消防員入室搜救,救 火指揮官湯佳興卻未依規定於入室 搜索前先登錄管制搜救小組之姓名 、人數、時間及氣瓶壓力,且未指 派專人管制進出,人員進出均未向 指揮官報備,致第4 梯次在保齡球 館2 樓平台準備入室之二搜不知室 內救災人數,二搜發現火場煙層下 降天花板出現火羽流時曾喊撤退、 撤水線。在全面燃燒前最後脫離火 場之黃鈺翔稱:其在室內時水帶突 然扁塌,隨後從無線電聽到現場有 火勢竄出及請撤停放撤退的訊息等 語。趙威懿稱:其沿水線走時聽到 2 樓平台同仁急喊「撤退」,其退 至2 樓平台後聽到平台上的人說要 「撤水線」等語。救火指揮官湯佳 興因未依規定登錄管制搜救小組, 致室外無人知悉有多少救災人員仍 在室內,其呼喊撤退後,不知何人 中斷後方水源,致使室內人員之水 帶扁塌,無法循水線逃至室外,二 搜在救出吳東奇、黃鈺翔後,詢問 其有無人員仍在內部,回答已無人 (註61)時,率相關人員離開2 樓平台,內部人員也因此喪失最後 救援之機會,湯佳興實有疏失。 十一、救火指揮官湯佳興於火災發生當日 僅攜帶1 支無線電手提台救災,雖未 違反規定,但因疏於注意大型鐵皮屋 對電磁波傳遞之重大阻礙,未使用直 通頻道,全程以「中繼頻道」指揮現 場救災,且未曾與室內人員進行無線 電測試,確認通信是否良好,致其8 次呼叫撤出卻無人回應,三搜自接收 靈敏度較高之車裝台聽到之殉職人員 喊救命聲,湯佳興卻未聽聞,即有違 失。另該府於本件火災後,始於104 年4 月8 日發布新的無線電使用規定 ,規定各級指揮官攜帶2 部無線電手 提台,1 部以「救災現場直通頻道」 指揮現場救災,另1 部以「救災中繼 頻道」與漢水通訊,實有失當。 (一)救災無線電通訊頻道,主要區分為 中繼頻道與直通頻道,前者(中繼 頻道)係透過基地台的轉接,使訊 息能在救災現場與指揮中心之間進 行傳遞,用於遠距離之通訊聯繫, 一般用於指揮官與指揮官或指揮官 與指揮中心間指令之下達或回報; 後者(直通頻道)則係未經基地台 轉接進行之傳達模式,較適用於救 災現場短距離訊息之傳遞,一般用 於指揮官與救災人員間指令之下達
監察院公報【第3058 期】 ‧51‧ 與回報。因此,中繼頻道與直通頻 道,其用途並不相同。依桃園縣政 府消防局98 年2 月20 日消防工作 實務手冊第七篇柒、二、(五)「桃 園縣政府消防局災害搶救暨緊急救 護無線電頻道使用說明表」、該局 102 年4 月30 日「消防通資裝備 保養檢查實施計畫」附件1(消防 通資設備保養維護暨使用管理注意 事項)規定,災害搶救暨緊急救護 無線電頻道使用方式為:「頻道5 救災現場直通頻道:由指揮中心調 度,於災害現場使用,指揮官攜帶 2 部無線電手提台,1 部以第5 直 通頻道指揮現場救災,另1 部以救 災中繼頻道以中繼頻道與漢水及未 在現場單位人員通訊。頻道7 救災 中繼頻道(指揮聯繫用)東眼山站 台:用於1.執行災害搶救勤務,與 本局指揮中心、消防單位通訊使用 。2.通訊對象距離較遠時(除災害 現場外),與6、8、9 頻道相通, 適用於坪頂、迴龍、龜山、中壢、 興國、華勛、龍岡、幼獅、新屋、 永安、山腳、大園、觀音、草漯、 平鎮、復旦、山峰、高平、復興、 巴陵分隊及本線沿海地區。」依此 規定,救災指揮官攜帶2 部無線電 手提台,其一以直通頻道指揮現場 救災,另一部以中繼頻道與指揮中 心及未在現場單位人員通訊,頻道 7 僅供指揮聯繫用。嗣桃園縣政府 消防局於102 年10 月15 日發布「 救災救護無線電頻率使用規定」「 一、CH7 救災中繼頻道:執行災害 搶救勤務,與本局指揮中心及各救 災單位通訊使用,原則上只要是非 救護案件出勤均使用該頻道(指揮 中心另定者除外)。……三、CH3 、CH5、CH8 救災現場直通頻道: 指揮官前往災害現場於執行任務時 ,得使用2 支無線電,一支以 CH7 與指揮中心通聯,另一支以 CH3 或5 或8(經指揮中心或救火 指揮官統一律定)與救災現場各救 災人員通聯使用。」嗣該局又於 103 年4 月9 日以電子通報方式發 布「救災救護無線電頻率使用規定 」,規定救災「(一)救災中繼頻道 :執行救災勤務使用,只要是非救 護案件出勤,一律使用該頻道。( 二)CH6 救災直通頻道(可與CH7 互通聯):平常不可使用,使用時 機如下:1.於災害現場因環境因素 (如大樓內或地下室等)無法使用 CH7 通訊時,立即改用CH6 呼叫 現場指揮官或救災現場車裝台以傳 達通訊。……三、CH3.CH5.CH8 現 場直通頻道:本頻道經指揮中心統 一律定於各災害或演習現場使用, 此時救護及救災中繼頻道仍為CH4 及CH7,救災救護指揮官視情形 拿2 支以上無線電。」等語。 (二)依上開104 年4 月9 日無線電使用 規定,救災救護指揮官視情形拿2 支以上無線電,亦即其得僅攜帶1 支無線電。104 年1 月20 日新屋 保齡球館火災救災指揮官即以中繼 頻道指揮救災,雖未違反上開規定 ,但因未使用直通頻道,不利於大 型鐵皮屋通訊。衡諸當時火場通訊 情形,揆諸富岡分隊楊孟哲(註62
監察院公報【第3058 期】 ‧52‧ )104 年1 月24 日檢察官訊問筆 錄證稱:「(問:你們第一線進入 被停水會有什麼問題?)如果有水 的話可以將附近降溫保護自己,我 就不清楚有無被停水,因為無線電 收訊不穩定,斷斷續續且跟站的位 置有關係」,二度入室之吳東奇於 同日檢察官訊問時亦證稱:「(問 :你第二次進入火場時,有無從無 線電聽到任何指示?)無。因為當 時有雜音,而且聽不太清楚」、「 (問:有無從無線電聽到要退出的 指示?)無。從我出來之前,沒有 聽到那個指示。」、「(問:你第 二次進去火場,到離開火場的過程 中,有無聽到無線電的聲音?)聽 不太清楚,我沒有聽到在講什麼」 等語,顯然楊孟哲、吳東奇二人皆 無法清楚聽到救火指揮官之無線電 ,指揮官未使用「直通頻道救災」 遂行救災,即有可議。 (三)桃園市政府消防局通訊系統鏈路是 東眼山、店子湖等5 個轉播站台( 註63)及水利大樓、石門山等2 個輔助接收站台組成,該系統於97 年建置完成。析其場強模擬圖,轉 播站台至新屋地區(下鏈)之場強 尚可,惟上鏈訊號則不佳。104 年 1 月20 日案發時,因救火指揮官 全程使用中繼頻道CH7 指揮現場 救災,其過程指揮中心均有錄音, 然析其譯文,指揮中心先後於02 :11(註64)、02:16(註65) 、02:22(註66)、02:25(註 67)多次呼叫新屋01,告知其訊 號相當模糊,並請救火指揮官以手 機或有線電話與漢水聯絡;尤有甚 者,連近在咫尺之新屋10(新屋分 隊值班台),亦於02:18(註68 )呼叫新屋01 表示訊號非常模糊 ,請其重發。錄音譯文亦顯示,於 02:21、02:23、02:27、02:37 、02:40、02:43、02:46 所錄均 為雜訊聲,此有指揮中心錄音檔可 稽。此一中繼頻道通訊品質不良情 形,與前揭場強圖揭示新屋地區為 相對弱訊地區相符,然桃園市政府 消防局對於所轄新屋地區為通訊不 良情形毫無所悉,更於102 年10 月 15 日、103 年4 月9 日先後發布「 重申無線電救災網頻率使用規定」 、「救災救護無線電頻率使用規定 」,以中繼頻道遂行現場指揮救災 。迨新屋保齡球館案造成重大傷亡 後,始於104 年4 月8 日修正「桃 園市政府消防局消防資通訊裝備保 養檢查實施計畫」,其中附件四「 桃園市政府消防局消防通訊裝備保 養維護暨使用管理注意事項」二、 (四)、6、(3)「桃園市政府消防局 無線電頻道使用說明表」規定各級 指揮官攜帶2 部無線電手提台,1 部以「救災現場直通頻道」指揮現 場救災,另1 部以「救災中繼頻道 」與漢水通訊,足見該局103 年4 月9 日發布之救災救護無線電頻率 使用規定有所違誤,造成該局長期 以來一直均以中繼頻道替代現場直 通頻道。本案救火指揮官消防素養 不足,疏於注意現場大型密閉鐵皮 建築之通訊風險,未曾與入室人員 進行無線電測試,據三搜施分隊長
監察院公報【第3058 期】 ‧53‧ 轉述,三搜趕赴火場途中,於距火 場約百公尺處,自車裝台(接收靈 敏度較高)聽到殉職人員喊救命聲 ,而指揮官卻未聽到,亦徵當時之 7 號頻道與室內通訊不佳。 (四)綜上,桃園縣政府消防局於本件火 災發生前,規定救災救護指揮官依 可視情形拿2 支以上無線電,亦得 僅攜帶1 支無線電,造成長期以來 救火指揮官均以中繼頻道替代現場 直通頻道。惟救災現場直通頻道, 一般用於指揮官與救災人員間指令 之下達與回報,與透過基地台轉接 ,使訊息能在救災現場與指揮中心 間傳遞之「中繼頻道」用途不同。 本案救火指揮官湯佳興當日僅攜帶 1 支無線電手提台救災,雖未違反 103 年4 月9 日之規定,但因疏於 注意大型鐵皮屋對電磁波傳遞之重 大阻礙,未使用直通頻道,全程以 「中繼頻道」指揮現場救災,且未 曾與室內人員進行無線電測試,確 認通信狀況良窳,致8 次呼叫撤出 ,無人回應,三搜自車裝台(接收 靈敏度較高)聽到殉職人員喊救命 聲,現場指揮官卻未聽到,即有違 失。另該府本件火災後,始於104 年4 月8 日發布新的無線電使用規 定,規定各級指揮官攜帶2 部無線 電手提台,1 部以「救災現場直通 頻道」指揮現場救災,另1 部以「 救災中繼頻道」與漢水通訊,實有 失當。 十二、新屋保齡球館面積2,580 平方公尺 、深度達75 公尺,係屬甲類場所, 亦屬「無開口樓層」,依「各類場所 消防安全設備設置標準」,應設排煙 設備,惟新屋消防分隊歷次安全檢查 均未要求設置,顯有違失。 (一)按新屋保齡球館係屬「各類場所消 防安全設備設置標準」第12 條第 1 款第2 目規定之甲類場所,依同 標準第28 條第1 項第1 至3 款規 定,供甲類場所使用,樓地板面積 合計在500 平方公尺以上之場所( 第1 款),或樓地板面積在1,000 平方公尺以上之無開口樓層,均應 置設排煙設備。所稱無開口樓層, 按同標準第4 條第2 項規定,係指 10 層以下之樓層供避難及消防搶 救用之有效開口面積,未「具可內 切直徑50 公分以上圓孔之開口, 合計面積為該樓地板面積30 分之 1 以上者。但其中至少應具有2 個 內切直徑1 公尺以上圓孔或寬75 公分以上、高120 公分以上之開口 。」者。又各級消防主管機關辦理 消防安全違法案件處理注意事項二 、(二):「未申領使用執照或未依 使用執照用途之違規使用場所,以 其實際用途分類列管檢查;其不合 規定事項,依消防法相關規定處理 。」析言之,新屋保齡球館既是甲 類場所,亦屬2 樓面積2,580 平方 公尺之無開口樓層,未領有使用執 照,2 樓登記為住宅,依前揭「各 類場所消防安全設備設置標準第28 條第1 款或第3 款或各級消防主管 機關辦理消防安全違法案件處理注 意事項二、(二)規定,均應依規定 設置排煙設備,合先敘明。 (二)次查本院104 年1 月29 日履勘新
監察院公報【第3058 期】 ‧54‧ 屋保齡球館火災現場,發現該館( 甲類場所)位於2 樓,四周幾無開 口,顯屬各類場所消防安全設備設 置標準第4 條所稱「無開口樓層」 ,詎現場竟未設置排煙設備。同日 下午桃園市政府消防局專案簡報「 新屋保齡球館火警救災及安檢情形 」,強調建築物依規定設有滅火器 、標示設備、緊急照明燈、火警自 動警報、緊急廣播、室內消防栓、 火警自動警報、緊急廣播及自動灑 水滅火等消防安全設備等語,間接 承認現場並未設置排煙設備,惟堅 稱所屬新屋消防分隊自98 至103 年合計執行消防安全檢查28 次, 其中,不符規定限期改善共8 次, 舉發1 次,罰鍰12,000 元;案發 前,於103 年7 月24 日之檢查結 果亦合格。 (三)惟查新屋保齡球館為面積500 平方 公尺以上之甲類場所,四周幾無開 口,亦屬面積1,000 平方公尺以上 之「無開口樓層」,依法應設排煙 設備。析其104 年1 月29 日專案 簡報,並未交代現場未設置排煙設 備,本院詢問為何未依規定要求其 設置,該局初以「檢查人員平時業 務繁忙,對於消防安全設備設置標 準並不熟悉」云云置辯。惟該局預 防科賴志忠科長同日應詢時則坦承 :「本場所應該要檢討排煙設備, 這是應該要改進部分」等語在卷可 參。另該局104 年2 月5 日公布「 1040120 新屋區中興北路101 號新 屋保齡球館火警專案調查報告」, 本院復請該局說明該報告何以未檢 討應設排煙設備,該局104 年2 月 13 日桃消救字第1040004684 號函 始陳稱「查保齡球館用途之場所, 應依各類場所消防安全設備設置基 準第28 條檢討『排煙設備』之設 置,惟新屋保齡球館現場卻未檢討 設置,且本局調查報告亦僅依新屋 消防分隊之消防安全設備檢查紀錄 ,提列安全檢查情形,未針對排煙 設備之設置作檢討,實屬本局疏漏 之處,檢討改進」,坦承確屬其疏 漏之處。 (四)綜上,新屋保齡球館為甲類場所, 且為面積2,580 平方公尺之無開口 樓層,依各類場所消防安全設備設 置標準第28 條第1 款或第3 款、 各級消防主管機關辦理消防安全違 法案件處理注意事項二、(二)規定 ,均應依規定設置排煙設備,惟桃 園市消防局長期放水,未要求依規 定設置,顯有違失。 綜上所述,桃園市政府於本案亞洲保齡 球館使用執照核發、違建查報、稽查追 蹤、農地大型違建管制、消防安全設備 檢修及複查等相關作為,皆顯有違失; 消防局救火指揮官對火場狀況、人員管 制、無線電訊號不良等未能切實掌握, 終致本件火災釀成6 名消防人員同時殉 職,該府所屬各機關顯未善盡其職,爰 依監察法第24 條規定提案糾正,移送 行政院轉飭所屬確實檢討改善見復。 註1: 99 年8 月5 日桃新鄉城字第099001 4362 號函。 註2: 城鄉發展處行政科莊敬權任期: 97.12.15-103.9.10。 註3: 城鄉發展處處長李永展任期:
監察院公報【第3058 期】 ‧55‧ 96.10.1-100.2.28。 註4: 城鄉發展處行政科莊敬權任期: 97.12.15-103.9.10。 註5: 城鄉發展處處長李永展任期: 96.10.1-100.2.28。 註6: 102 年8 月5 日桃商登字第10200224 16 號函。 註7: 城鄉發展局局長吳啟民任期:100.3.1 -103.6.2、103.7.28-103.12.24。 註8: 城鄉發展局103 年12 月19 日府城行 字第1030313827 號函。 註9: 陳建業:103 年7 月退休。 註10:新屋鄉中正路110 巷95 弄24 之3 號。 註11: 建築法73 條第2 項:建築物應依核 定之使用類組使用,其有變更使用 類組或有第九條建造行為以外主要 構造、防火區劃、防火避難設施、 消防設備、停車空間及其他與原核 定使用不合之變更者,應申請變更 使用執照。 註12: 建築法77 條之2 第1 項:建築物室 內裝修應遵守左列規定:一、供公 眾使用建築物之室內裝修應申請審 查許可,非供公眾使用建築物,經 內政部認有必要時,亦同。但中央 主管機關得授權建築師公會或其他 相關專業技術團體審查。二、裝修 材料應合於建築技術規則之規定。 三、不得妨害或破壞防火避難設施 、消防設備、防火區劃及主要構造 。四、不得妨害或破壞保護民眾隱 私權設施。 註13: 建築法77 條第1 項:建築物所有權 人、使用人應維護建築物合法使用 與其構造及設備安全。 註14: 建築法77 條第3 項:供公眾使用之 建築物,應由建築物所有權人、使 用人定期委託中央主管建築機關認 可之專業機構或人員檢查簽證,其 檢查簽證結果應向當地主管建築機 關申報。非供公眾使用之建築物, 經內政部認有必要時亦同。 註15: 建築法第91 條第1 項:有左列情形 之一者,處建築物所有權人、使用 人、機械遊樂設施之經營者新臺幣6 萬元以上30 萬元以下罰鍰,並限期 改善或補辦手續,屆期仍未改善或 補辦手續而繼續使用者,得連續處 罰,並限期停止其使用。必要時, 並停止供水供電、封閉或命其於期 限內自行拆除,恢復原狀或強制拆 除:一、違反第73 條第2 項規定, 未經核准變更使用擅自使用建築物 者。二、未依第77 條第1 項規定維 護建築物合法使用與其構造及設備 安全者。 註16: 依據該府工務局95 年分層負責明細 表,本案之違規使用認定、違規建 築物使用罰鍰、斷水斷電業務係課 長核定;違規使用建築物移送法辦 業務係局長核定。 註17: 工務局長郭蔡文任期:93.8.30- 96.9.30。 註18: 工務局管理科長劉棕元任期:99.4.1- 99.12.31、100.1.1-101.7.26。 註19: 工務局長古沼格任期:97.7.25- 101.8.31。依據該府工務局分層負責 明細表100 年5 月版,違章建築資 料之處理轉報由局長核定。 註20:工務局管理科長劉棕元任期: 99.4.1-99.12.31、100.1.1-101.7.26; 已離職。
監察院公報【第3058 期】 ‧56‧ 註21: 工務局長古沼格任期:97.7.25- 101.8.31。依據該府工務局分層負責 明細表100 年5 月版,違章建築資 料之處理轉報由局長核定。 註22: 工務局管理科長鄔承傑任期: 101.7.27-101.11.30。 註23: 工務局管理科長鄔承傑任期: 101.7.27-101.11.30。 註24: 工務局使用管理科科長潘子儀任期 :102.4.22-103.6.2。 註25: 工務局局長朱惕之任期:101.9.1- 101.10.2 代理局長、102.1.18- 103.6.2、103.7.28-103.7.3。 註26: 工務局使用管理科科長潘子儀任期 :102.4.22-103.6.2。 註27: 工務局局長朱惕之任期:101.9.1- 101.10.2 代理局長、102.1.18- 103.6.2、103.7.28-103.7.3。 註28: 工務局使用管理科代理科長陳育時 任期:103.6.3-103.7.27。 註29: 工務局使用管理科科長潘子儀任期 :103.7.28-103.9.14。 註30: 工務局局長郭振寰任期:103.6.2- 103.7.27。 註31: 工務局局長江南志任期:103.7.31- 103.12.24。 註32: 工務局使用管理科代理科長陳育時 任期:103.6.3-103.7.27。 註33: 工務局使用管理科科長潘子儀任期 :103.7.28-103.9.14。 註34: 工務局局長郭振寰任期:103.6.2- 103.7.27。 註35: 工務局局長江南志任期:103.7.31- 103.12.24。 註36: 103 年9 月3 日桃工拆字第1030063 760 號函。 註37: 建築法第25 條:建築物非經申請直 轄市、縣(市)(局)主管建築機 關之審查許可並發給執照,不得擅 自建造或使用或拆除。 註38: 建築法第81 條:直轄市、縣(市) (局)主管建築機關對傾頹或朽壞 而有危害公共安全之建築物,應通 知所有人或占有人停止使用,並限 期命所有人拆除;逾期未拆者,得 強制拆除之。 註39: 建築法第86 條:違反第25 條之規定 者,依左列規定,分別處罰:一、 擅自建造者,處以建築物造價千分 之50 以下罰鍰,並勒令停工補辦手 續;必要時得強制拆除其建築物。 二、擅自使用者,處以建築物造價 千分之50 以下罰鍰,並勒令停止使 用補辦手續;其有第58 條情事之一 者,並得封閉其建築物,限期修改或 強制拆除之。 註40: 103 年5 月13 日桃農管字第10300 09855 號函。 註41: 102 年8 月21 日桃農管字第10200 17832 號函。 註42: 99.10.09 、99.10.22 、100.06.07 、 101.02.13 、101.06.21 、101.11.21 、 102.05.15、103.07.03、103.12.08 檢修 申報之案件聯絡人,均為林勝國。 註43: 室內消防栓設備:1.控制盤電壓表 故障/開關未定位/呼水槽浮球故 障;2.加壓送水裝置無法持壓,無法 實施性能測試。 自動撒水設備:1.加壓送水裝置無持 壓,無法實施性能測試。2.……。 火警自動警報設備:1.受信總機開關 未定位/迴路線路未接/預備電源
監察院公報【第3058 期】 ‧57‧ 故障。2.第1~5 迴路火災誤報,迴 路拆除,探測器均無動作。3.第7 迴 路斷線/標示燈故障1 只。4.受信總 機預備電池故障。 緊急廣播設備:1.廣播主機預備電源 故障。 註44: 室內消防栓、自動撒水、火警自動 警報及緊急廣播等設備之故障情形 ,與99 年上半年申報同。 註45: 室內消防栓設備:1.控制盤電壓表 故障/開關未定位/呼水槽浮球故 障;2.加壓送水裝置無法持壓,無法 實施性能測試。 自動撒水設備:1.撒水馬達控制盤線 路故障,無法進行所有相關測試。 火警自動警報設備:第1L~7L 迴路 火災誤報,迴路拆除,所有探測器 均無動作。 緊急廣播設備:1.廣播主機預備電源 故障。2.主機未與火警連動。 註46: 按林文智104 年4 月20 日訊問筆錄 ,因為長官希望給業者改善時間, 讓業者有改善空間,所以先給他合 格。 註47: 依消防安全設備檢修申報書,消防 設備師蘇進發於101 年2 月9 日檢 查亞洲保齡球館之消防安全設備, 改善計畫書略以: 室內消防栓設備:1.控制盤電壓表故 障/開關未定位/呼水槽浮球故障 ;2.加壓送水裝置無法持壓,無法實 施性能測試。 自動撒水設備:1.撒水馬達控制盤線 路故障,無法進行所有相關測試。 火警自動警報設備:第1L~5L 火災 誤報,迴路拆除。 緊急廣播設備:1.廣播主機預備電源 故障。2.主機未與火警連動。 註48: 依消防安全設備檢修申報書,胡志 偉消防設備士於101.06.20 檢查亞洲 保齡球館之消防安全設備,改善計 畫書略以: 室內消防栓設備:1.控制盤電壓表故 障/開關未定位/呼水槽浮球故障 ;2.加壓送水裝置無法持壓,無法實 施性能測試。 自動撒水設備:1.撒水馬達控制盤線 路故障,無法進行所有相關測試。 火警自動警報設備:第1L~5L 火災 誤報,迴路拆除。 緊急廣播設備:1.廣播主機預備電源 故障。2.主機未與火警連動。 註49: 室內消防栓設備:1.控制盤電壓表 故障/開關未定位/呼水槽浮球故 障。2.加壓送水裝置無法持壓,無法 實施性能測試。 自動撒水設備檢查表:撒水馬達控 制盤線路故障,無法進行所有相關 測試。 火警自動警報設備:第1L~5L 火災 誤報,迴路拆除。 緊急廣播設備:1.廣播主機預備電源 故障。2.主機未與火警連動。 註50: 彭安宗,自承登載不實,詳桃園地檢 署偵查卷偽造文書卷3 第158 頁。 註51: 彭安宗自承登載不實,詳桃園地檢 署104 偵字第4144 偵查卷三P159。 註52: 彭安宗自承登載不實,詳桃園地檢 署104 偵字第4144 偵查卷三P159。 註53: 編號03875。 註54: 編號38184。 註55: 桃園縣政府98 年2 月20 日修正。
監察院公報【第3058 期】 ‧58‧ 註56: 詳見桃園市政府消防局104 年2 月 13 日桃消救字第1040004684 號函附 無線電補充譯文,略以:「新屋01 呼叫新屋現場那個同仁,延燒地方 在後側在後側,火點在後面。」惟 該局「火災搶救報告書」對於延燒 地點在後面並未交代。 註57: 經查劉○○等二人,係應指揮官要 求從樓梯下來,非被救出。 註58: 經查無線電譯文,並無「停放撤退 」字眼。 註59: 02:28:17 加85 秒。 註60: 吳東奇104 年1 月24 日訊問筆錄, 略以:「問:已經進入火場的同仁 ,如果沒有辦法掌握的話,是否當 火場出現極端行為,也沒有辦法即 時叫他們撤出?答:撤出的話,透 過無線電還是可以叫他們撤出。問 :如果今天外面的人,不知道火場 裡面有人,無線電要叫誰撤出?答 :無線電會說:『請裡面所有同仁 儘快撤出。』」 註61: 二搜謝伯彥、林加瑋104 年3 月2 日接受本院詢問,證稱:「問裡面 有無人,他們無回話。」有間。 註62: 楊孟哲,與簡明倫分隊長同進同出 ,約於2 時40 分退出火場,二人在 全面燃燒之前,未再進入火場。 註63: 上高義、東眼山、壽山巖、世貿財 星、店子湖。 註64: 02:11 漢水無線呼叫-新屋01 新屋 01 漢水呼叫,你的訊號模糊,請重 發。 註65: 02:16 漢水無線呼叫-新屋01 麻煩 您用有線電話與漢水聯絡,你的訊 號相當模糊。 註66: 02:22 漢水無線呼叫-新屋01 新屋 01,漢水呼叫,麻煩請你用手機撥 119 電話跟漢水聯絡一下,謝謝。 註67: 02:25 漢水無線呼叫-新屋01 新屋 01,漢水呼叫,新屋01 新屋01,漢 水呼叫,請撥119 電話跟漢水聯絡 一下。 註68: 02:18 新屋10 無線呼叫-新屋01 新屋01 你的訊號非常模糊,麻煩請 重發。 ***************** 會議紀錄 ***************** 一、本院司法及獄政委員會第5 屆第 38 次會議紀錄 時 間:中華民國106 年9 月13 日(星 期三)上午9 時45 分 地 點:第1 會議室 出席委員:方萬富 王美玉 仉桂美 林雅鋒 劉德勳 列席委員:尹祚芊 包宗和 江綺雯 李月德 高鳳仙 陳小紅 陳慶財 章仁香 楊美鈴 蔡培村 請假委員:江明蒼 主 席:方萬富 主任秘書:王增華 記 錄:林秀珍 甲、報告事項 一、宣讀上次會議紀錄。 決定:確定。 二、司法院、法務部函送,106 年度本院司 法及獄政、外交及僑政委員會聯合巡察
監察院公報【第3058 期】 ‧59‧ 臺南地區司法機關業務座談會會議紀錄 及巡察委員提示事項辦理情形彙復表, 報請鑒察。 決定:准予備查。 乙、討論事項 一、監察業務處移來,據訴:法務部所屬各 檢察署內部刑事檔案建置疑有缺失等情 一案,提請討論案。 決議:本案列入中央機關巡察議題之參 考。 二、監察業務處移來,據訴,為司法院大法 官審理同婚釋憲案,破壞憲政體制,侵 害立法自由,涉有違法失職等情乙案, 提請討論案。 決議:(一)為更釐清大法官第748 號解 釋相關問題爭點,函請司法 院、內政部、法務部說明見 復。 (二)將本案處理進度函復陳訴人。 (三)本案司法院及內政部之函復 內容,提司法及獄政、內政 及少數民族委員會聯席會議 審議。 三、司法院函復,審計部102 年度中央政府 總決算審核報告,有關法院辦理刑事保 證金發還作業之成效欠佳等情案之查處 情形,提請討論案。 決議:函請司法院於107 年2 月底前, 依該院復函附表一至一-2 之格 式,提供截至106 年12 月31 日 止,各法院所保管刑事保證金之 處理成效,表內各法院之「已處 理」之「其他」欄位非為0 者, 請說明其處理情形,「未處理」 欄位非為0 者,並請說明其未處 理之原因。 四、司法院函復,據訴,臺灣臺北地方法院 檢察署偵辦96 年度偵字第25790 號其 被訴違反證券交易法案件,疑以不正方 法訊問,且未將完整卷證資料移送法院 ;又相關事證原承辦檢察官疑未歸檔致 遺失,使法院無法調閱原始資料;復臺 灣高等法院審理102 年度金上重更(一) 字第7 號其被訴上開案件,對於重大消 息明確時點之認定,疑判決見解有所歧 異,涉違反正當法律程序及公平法院原 則,侵害當事人訴訟基本權等情案之查 處情形,提請討論案。 決議:抄核簽意見四,函請司法院辦理 見復。 五、法務部函復,有關「不予假釋決定救濟 制度之探討」通案性案件調查研究之後 續查處情形,提請討論案。 決議:併卷存查。 六、法務部函復,有關臺灣臺北地方法院檢 察署偵辦96 年度偵字第25790 號其被 訴違反證券交易法案件,疑以不正方法 訊問,且未將完整卷證資料移送法院; 又相關事證原承辦檢察官疑未歸檔致遺 失,使法院無法調閱原始資料;復臺灣 高等法院審理102 年度金上重更(一)字 第7 號其被訴上開案件,對於重大消息 明確時點之認定,疑判決見解有所歧異 ,涉違反正當法律程序及公平法院原則 ,侵害當事人訴訟基本權等情案之查處 情形,提請討論案。 決議:抄核簽意見四,函請法務部再為 檢討見復。 七、法務部函復,據訴,臺灣臺東地方法院 審理96 年度易字第282 號詐欺等案件 ,其具狀請求臺灣臺東地方法院檢察署 檢察官提起上訴,惟該檢察官未於上訴
監察院公報【第3058 期】 ‧60‧ 理由書內具體載明上訴理由,致遭臺灣 高等法院花蓮分院98 年度上易字第97 號判決駁回。詎法務部及臺灣高等法院 花蓮分院檢察署仍認該檢察官並無違失 ,涉嫌包庇等情案之查處情形,提請討 論案。 決議:(一)影附法務部復函函復陳訴人 後併案存查。 (二)函請法務部將研議「檢察機 關辦理刑事訴訟案件應行注 意事項」修正事宜之後續辦 理情形函復本院。 八、法務部函復,該部矯正署臺北監獄辦理 陳訴人移監屏東監獄過程失當,違反監 獄受刑人移監作業要點規定,影響家屬 探視權益;又辦理陳訴人戒護外醫作業 不當,未深入調查戒護外醫報告單及檢 查單遺失之事實,亦未追究相關人員之 行政責任,輕忽文書保管之重要性,漠 視受刑人之權益等情糾正案之查處情形 ,提請討論案。 決議:(一)法務部函復符合本院調查意 見意旨,糾正案結案;函請 改善案結案,調查案結案。 (二)函請法務部轉飭所屬矯正署 應本於權責,落實督導所屬 賡續妥處,並自行列管追蹤 後續相關處理情形。 九、法務部函送,106 年1 月至6 月中央機 關辦理國家賠償事件處理情形統計表及 相關協議書、判決書等影本,暨「104 年至106 年上半年度中央機關辦理國家 賠償事件求償情形統計表」乙案,提請 討論案。 決議:(一)關於臺北地檢署漏未撤銷限 制出境處分之國家賠償( 105 年度賠議字第4 號)案 件,函請法務部查明見復, 並檢附相關資料供參。 (二)有關106 年1 月至6 月中央 機關辦理國家賠償事件處理 情形統計表等資料,予以存 查。 十、法務部函復,有關臺灣士林地方法院檢 察署及法務部調查局士林調查站副站長 ,疑有共同捏造犯罪證據並製作不實筆 錄及隱匿偵訊錄音錄影資料,且對陳訴 人要求複製前揭影音資料及筆錄,予以 拒絕等情案之查處情形,提請討論案。 決議:本件併案存查。 十一、法務部函復,有關陳訴人陳訴,受刑 人林○○前於法務部矯正署屏東監獄服 刑期間,私藏手機對外聯絡,且毛髮疑 驗出海洛英反應,顯示獄政管理存有疏 漏等情一案之查處情形,提請討論案。 決議:影附法務部前次及本次復函函復 陳訴人後併案存查。 十二、法務部函送「法務部廉政署106 年第 2 季辦理行政肅貪案件成果彙整一覽表 」及「106 年度第2 季肅貪執行小組追 究簡任行政責任成果表」之查處情形, 提請討論案。 決議:函請法務部將許○○等4 人未依 規定辦理採購、使廠商獲超額利 潤乙案之後續處理結果函復本院。 十三、王委員美玉、仉委員桂美調查「我國 政風機構與人員之設置,原係機關防制 貪瀆的內部控制機制,惟近期部分政風 機構與人員進行內部調查所採取之手段 ,因涉有逾越權限及違反比例原則之虞 ,引發社會爭議。究政風機構與人員的 法定職掌及其定位為何?進行調查所採
監察院公報【第3058 期】 ‧61‧ 取之方式、措施及其適法性?有無逾越 一般法律原則情事?事涉政風機構與人 員進行內部調查之權責與界限,有深入 瞭解之必要案」報告,提請討論案。 決議:(一)修正通過。 (二)調查意見一至二,糾正法務 部。 (三)調查意見三,函請法務部確 實檢討改進見復。 (四)調查意見四,函請法務部參 處。 (五)調查意見,函復陳訴人。 (六)調查意見送本院人權保障委 員會參考。 (七)調查意見(含案由、調查委 員姓名、處理辦法)上網公 布。 十四、王委員美玉、仉委員桂美提:法務部 未善盡監督職責,任令現行規範政風人 員權限之相關法規內容未盡明確,逾越 一般人所得預見與理解,核與法律明確 性原則不符,致部分政風人員職權之行 使未能認識職權行使過程及手段須合於 比例原則及權力分立原則,超出行政權 範疇,肇致逾越權限侵害人民權益之案 例發生,引發社會質疑,核有違失,爰 依法提案糾正,提請討論案。 決議:糾正案文修正通過並公布。 散會:上午11 時 二、本院司法及獄政、內政及少數民 族委員會第5 屆第36 次聯席會議 紀錄 時 間:中華民國106 年9 月13 日(星 期三)上午9 時30 分 地 點:第1 會議室 出席委員:尹祚芊 方萬富 王美玉 仉桂美 江綺雯 林雅鋒 陳小紅 章仁香 劉德勳 蔡培村 列席委員:包宗和 李月德 高鳳仙 陳慶財 楊美鈴 請假委員:江明蒼 主 席:方萬富 主任秘書:王增華 周萬順 記 錄:林秀珍 甲、報告事項 一、宣讀上次會議紀錄。 決定:確定。 乙、討論事項 一、法務部函復,臺灣高雄地方法院檢察署 前檢察官井○○違反貪污治罪條例等案 件,業經最高法院104 年度台上字第 3450 號判決上訴駁回確定,詎井員於 發監服刑前潛逃無蹤,凸顯我國現行防 範被告潛逃之相關機制存有疏漏等情乙 案之查處情形,提請討論案。 決議:抄核簽意見三,函請法務部賡續 辦理見復。 二、據續訴,臺灣臺北地方法院檢察署檢察 官偵辦96 年度偵字第23191 號公共危 險等案件,涉嫌指揮臺北市政府警察局 中正第二分局承辦員警湮滅監視錄影及 照片等證據資料,影響被告權益等情乙 案,提請討論案。 決議:影附陳訴人106 年8 月8 日、8 月22 日陳訴書(陳訴人姓名及 個資部分遮掩)函請法務部轉該 管檢察機關查明後依法偵辦,並 副知陳訴人。 散會:上午9 時36 分
監察院公報【第3058 期】 ‧62‧ 三、本院司法及獄政、內政及少數民 族、國防及情報委員會第5 屆第 6 次聯席會議紀錄 時 間:中華民國106 年9 月13 日(星 期三)上午9 時37 分 地 點:第1 會議室 出席委員:尹祚芊 方萬富 王美玉 仉桂美 包宗和 江綺雯 李月德 林雅鋒 高鳳仙 陳小紅 陳慶財 章仁香 劉德勳 蔡培村 列席委員:楊美鈴 請假委員:江明蒼 主 席:方萬富 主任秘書:王增華 周萬順 王 銑 記 錄:林秀珍 甲、報告事項 一、宣讀上次會議紀錄。 決定:確定。 乙、討論事項 一、王委員美玉、仉委員桂美提:有關「據 訴,現行刑事訴訟法雖未規範測謊鑑定 之證據能力,然偵審實務卻不排斥測謊 鑑定,並得引為刑事證據,惟採用迄今 司法機關並未就測謊鑑定統一制(訂) 定相關規範及標準作業流程,作為偵審 依據,肇致各級法院與檢察機關判斷標 準不一,實易生冤抑,除涉有背離真實 發見義務外,亦與聯合國公民與政治權 利國際公約第14 條公平法院原則未盡 相符等情案」之調查報告,建議編印專 書,分送行政院、司法院等機關學校團 體乙節,提請討論案。 決議:(一)本調查報告於司法改革國是 會議引起極大迴響,值得重 視。為更深化、周延,將「 完善證據法則與救濟無辜( 涵蓋科學辦案、鑑定、測謊 、指認等)」列為年度通案 性案件調查研究議題,做深 度分析研究。 (二)同意印製專書分送行政、司 法機關學校團體。 (三)印製內容以調查報告公布版 為準,並請注意印製數量。 二、司法院及法務部函復,屏東縣政府警察 局內埔分局辦理劉○○被訴傷害致人於 死案件,偵辦過程涉有諸多違失;臺灣 高等法院高雄分院僅憑單方證人證言, 率以判決劉○○有罪,經提起上訴,復 遭最高法院判決駁回,損及權益等情乙 案之查處情形,提請討論案。 決議:(一)抄核提意見一,函請司法院 參酌見復。 (二)抄核提意見二,函請法務部 說明見復。 (三)抄核提意見函復陳訴人,並 影附法務部106 年7 月12 日復函及其附件供參。 散會:上午9 時45 分 四、本院司法及獄政、財政及經濟、 教育及文化委員會第5 屆第24 次 聯席會議紀錄 時 間:中華民國106 年9 月13 日(星 期三)上午9 時46 分 地 點:第1 會議室 出席委員:尹祚芊 方萬富 王美玉 仉桂美 包宗和 李月德 林雅鋒 孫大川 高鳳仙
監察院公報【第3058 期】 ‧63‧ 陳小紅 陳慶財 章仁香 楊美鈴 劉德勳 蔡培村 列席委員:江綺雯 請假委員:江明蒼 主 席:方萬富 主任秘書:王增華 蘇瑞慧 簡麗雲 記 錄:林秀珍 甲、報告事項 一、宣讀上次會議紀錄。 決定:確定。 乙、討論事項 一、行政院函復,有關對依少年事件處理法 施以感化教育之兒童及少年,於接受矯 正機關感化教育結業後,有無依據兒童 及少年福利與權益保障法第73 條之規 定,落實後續轉銜、復學教育;教育部 及矯正機關之輔導機制是否完善;收容 學生,尤其是女性收容學生之轉銜、復 學過程,有無遭遇排斥或歧視案之後續 檢討改善情形乙案,經交據法務部函報 會商相關機關辦理情形,提請討論案。 決議:(一)抄「五、核提意見」,函復 行政院。 (二)本案各項調查意見均經本會 同意辦結在案,糾正案結案 ,函請改善案及調查案結案。 散會:上午9 時47 分 ***************** 工 作 報 導 ***************** 一、106 年1 月至9 月份監察權行使情形統計表 項目 月份 收受人民書狀 (件) 監察委員調查 提案糾正 提案彈劾 提案糾舉 1 月 1,102 21 4
6
2 月 1,051 12 8
3
3 月 1,449 26
10
4 月 1,123 21 4 2
5 月 1,098 15 9 1
6 月 1,383 19 7 4
7 月 1,306 25 7 3
8 月 1,507 30 10 2
9 月 1,354 22 9 4
合計 11,373 191 68 25 0 監察院公報【第3058 期】 ‧64‧ 二、106 年9 月份糾正案件一覽表 編號 案由摘要 審查委員會 辦理情形 60 桃園市私立愛心老人長期照顧中心(養護型)於106 年 3 月10 日清晨5 時左右因使用蠟燭不慎引起火災,現場 未依法隨時保持至少護理人員1 人值班及置1 名本國籍 照服員;2 樓部分未經同意設立,且未設有任何消防設 施及設備,違法收住16 人,桃園市政府對此竟不知情 ;復對歷次聯合稽查發現該中心自成立以來持續存在之 照服員及護理人員不足之違規問題,未能有效督促並追 蹤確認已確實完成改善,桃園市社會局亦未以老人福利 法第47 條第2 項規定處理。且該府執行聯合稽查時, 無人負責統籌或指揮,復未將發現之問題進行跨局處之 協調或聯繫;該中心昇降設備以裝修材料封閉並設置扶 手掩飾,但其接縫處清晰可見,難謂與白牆完全融合, 惟該府近年來聯合稽查或消防安全檢查計11 次,到達 現場人員至少14 人,卻從未發現該昇降設備,顯見聯 合稽查、消防安全檢查流於形式。又該中心建築物辦理 變更使用執照(含室內裝修審查)過程,相關審查機構 及原桃園縣政府主管建築機關全然無視申請範圍內存在 既有昇降設備,未要求區隔處置,亦未要求檢討垂直防 火區劃,致該中心隱匿並違規擴充至第2 層使用,甚而 致災,核有不當。 內政及少數民 族委員會第5 屆第38 次會 議 106 年9 月11 日以院台內字 第1061930657 號函行政院轉 飭所屬確實檢 討改善見復。 61 苗栗縣聖方濟育幼院於105 年10 月9 日發生張姓生輔 員對何童施暴致死案件,經查張姓生輔員並非第1 次對 院生施暴,且該院有另一名黃姓生輔員也對院生嚴格管 教情事。苗栗縣政府對聖方濟育幼院應負監督責任,卻 未依法對責任通報人員應通報未通報裁處罰鍰,且該府 未依法予以詳查、命限期改善,之後也未將育幼院對院 生之照顧管教事項列為查核重點,因稽查不力導致該育 幼院院生多人陸續受傷害;新竹縣政府未落實對本案何 童之原生家庭定期追蹤評估、提供積極親職功能改善之 處遇服務,也未提出長期輔導計畫。上述機關違失情節 嚴重。 內政及少數民 族委員會第5 屆第38 次會 議 106 年9 月11 日以院台內字 第1061930665 號函行政院轉 飭所屬確實檢 討改善見復。 62 桃園市政府衛生局於無任何準據情形下,對於轄內食品 業者之稽查紀錄僅保存1 年,明顯違反檔案法相關規定 內政及少數民 族委員會第5 106 年9 月12 日以院台內字
監察院公報【第3058 期】 ‧65‧ 編號 案由摘要 審查委員會 辦理情形 ,確有違失。 屆第38 次會 議 第1061930644 號函行政院轉 飭所屬確實檢 討改善見復。 63 行政院農業委員會於102 年10 月9 日修正發布「申請 農業用地作農業設施容許使用審查辦法」,因欠缺審查 機制,導致心存僥倖之申請人,得以輕易憑藉著農業設 施申請屋頂附屬設置綠能設施,卻未能結合農業經營, 直至引發社會關注後,方於104 年2 月12 日建立行政 實務審查流程,核有疏失;經濟部能源局於農業設施容 許使用同意遭廢止後,附屬綠能設施電能費用補貼之適 法性及續處行政事項,未能及時妥適處理,衍生廢止案 件續處作業之爭議,迄106 年3 月始簽辦處理原則,長 達6 年3 個月未建立相關行政處置程序;復於容許使用 同意遭廢止後未能確實列管追蹤案件與以「改善中」等 理由,持續使申請人獲電費補貼,虛擲公帑等,均核有 疏失;而經濟部對於委任再生能源發電設備業務之所屬 能源局,未能善盡監督之責,亦難辭其咎。 財政及經濟委 員會第5 屆第 42 次會議 106 年9 月7 日以院台財字 第1062230468 號函行政院轉 飭所屬確實檢 討改善見復。 64 教育部明知國立臺灣大學郭○良教授發表之多篇論文涉 有造假等違反學術倫理案,其中部分共同發表之論文直 接涉及該校楊○池前校長,卻未主動進行查處作為,致 使該校需另成立特別委員會調查,招致外界質疑該校自 行調查程序及結果之公正性。且該部復怠未儘早完備學 術倫理相關規範,迨至系爭學術倫理案發生後,始被動 就相關事項予以明定。又,科技部認定郭○良教授造假 之研究計畫既多達11 個,違反學術倫理情節顯屬重大, 自應逐案追扣其可歸責之相關補助費用,詎該部竟僅追 回未及其計畫總經費5,302 萬7 千元3%之主持人費用, 明顯與相關人員所獲國家補助經費及資源,不成比例, 且該部迄未對相關涉案作者其他研究計畫一併徹查,消 極怠慢甚明,洵難獲社會正面觀感,經核均顯有欠當。 教育及文化委 員會第5 屆第 38 次會議 106 年9 月18 日以院台教字 第1062430267 號函行政院轉 飭所屬確實檢 討改善見復。 65 文化部(前行政院文化建設委員會)未依「讓世界看見 台灣藝術風華與內蘊-台灣百年藝術家傳記電子書建置 計畫」補助契約書第8 條侵權責任及驗收第3 項規定, 教育及文化、 司法及獄政委 員會第5 屆第 106 年9 月18 日以院台教字 第1062430271
監察院公報【第3058 期】 ‧66‧ 編號 案由摘要 審查委員會 辦理情形 要求全球華人藝術網有限公司交付授權書,驗收程序未 臻確實;又文化部於該公司執行計畫期間,獲悉有以機 關名義誤導藝術家等人士,並逾越計畫目的所為商業行 為時,未能積極因應並審慎妥處,致錯失遏止先機,肇 生日後諸多藝術家因涉及著作權法而恐遭箝制,實損及 國內藝術長遠發展,核有怠失。 7 次聯席會議 號函文化部確 實檢討改善見 復。 66 交通部所屬鐵路改建工程局辦理CCL531 標工程局部停 工報核範圍為「月台層以下車站站體、景觀、路工及排 水等全部工程範圍」,惟嗣後奉核之各車站復工報核範 圍擴大為「○○車站第一階段結構、建築裝修、一般機 電及排水等全部工程範圍」,除遭起訴涉有圖利承商之 嫌,亦不符工程實務,有損機關權益,有違契約管理機 關之職責,又檢討該標工程逾期情形,目前仍在釐清鄰 標交付時程延誤階段,而遲未能確認工程進度與交付情 形,惟本標契約第一階段工程已於104 年9 月15 日確 認完成,且本案於105 年12 月8 日經司法起訴及同年月 14 日媒體報導至今已逾半年,顯無法落實工程進度控管 ,均核有違失;交通部未善盡督導職責,亦難辭其咎。 交通及採購、 內政及少數民 族委員會第5 屆第38 次聯 席會議 106 年9 月14 日以院台交字 第1062530260 號函交通部轉 飭所屬確實檢 討改善見復。 67 交通部民用航空局對於復興航空運輸股份有限公司未落 實公司自我督察機制,致接連於103 年7 月及104 年2 月發生兩起重大事故,洵有監督不周之責,本院前已糾 正在案;嗣該公司雖導入國際飛安基金會的飛安管理系 統,惟其於104 年出現虧損後,業績仍持續惡化。縱使 交通部民用航空局已啟動4 次財務檢查,惟該局未能警 覺該公司可能因持續虧損且對未來之預期不樂觀,而於 公司資產仍大於負債時即予結束營業,復對其無預警停 航及自行決定即日起全面停航等違規情事,竟一籌莫展 。且現行民用航空法雖就公司違規事項定有罰鍰及廢止 許可之規範,然對於公司負責人等相關決策人員,追究 其違失責任之規定付之闕如,難杜類似恣意閒置航權, 破壞民航制度並損及公共利益等情事再度發生,經核確 有重大違失。 交通及採購、 財政及經濟委 員會第5 屆第 28次聯席會議 106 年9 月14 日以院台交字 第1062530246 號函行政院轉 飭所屬確實檢 討改善見復。 68 法務部未善盡監督職責,任令現行規範政風人員權限之 相關法規內容未盡明確,逾越一般人所得預見與理解, 司法及獄政委 員會第5 屆第 106 年9 月14 日以院台司字
監察院公報【第3058 期】 ‧67‧ 編號 案由摘要 審查委員會 辦理情形 核與法律明確性原則不符,致部分政風人員職權之行使 未能認識職權行使過程及手段須合於比例原則及權力分 立原則,超出行政權範疇,肇致逾越權限侵害人民權益 之案例發生,引發社會質疑,核有違失。 38 次會議議 第1062630242 號函法務部確 實檢討改善見 復。 三、106 年9 月份彈劾案件一覽表 案號 被彈劾人 案由 懲戒機關 裁判情形 姓名 職別 106 年劾字 第22 號 蔡永常 雲林縣口湖鄉鄉長 比照簡 任第10 職等(任期自99 年 3 月1 日起至105 年6 月30 日辭職)。 雲林縣口湖鄉前鄉長蔡永常, 以人頭司機詐領公款供其女繳 交汽車貸款,與公務員誠實清 廉謹慎、不得假借權力以圖本 身或他人利益之義務有違,違 失情節重大。 尚未裁判。 106 年劾字 第23 號 吳彥霖 丁政豪 李永龍 林照雄 桃園縣政府警察局平鎮分局 平鎮派出所所長,警正三階 (相當薦任第7 職等);現 任桃園市政府警察局民防管 制中心警務正。 桃園縣政府警察局平鎮分局 平鎮派出所巡佐,警正四階 (相當薦任第6 職等);現 任桃園市政府警察局平鎮分 局平鎮派出所警員。 桃園縣政府警察局平鎮分局 平鎮派出所警員,警正四階 (相當薦任第6 職等);已 於105 年11 月28 日退休。 桃園縣政府警察局平鎮分局 平鎮派出所警員,警佐一階 桃園縣政府警察局平鎮分局平 鎮派出所員警丁政豪、李永龍 、林照雄於民國101 年1 月 18 日、19 日未經立案,違法 搜索非轄內涉嫌毒品案件劉姓 犯嫌之住處,並以不偵辦毒品 等他案為條件控制並要脅劉姓 犯嫌交槍交人,作為春安工作 期間績效,該所所長吳彥霖亦 同意且共謀實行,致無辜第三 人被栽槍而遭查緝移送起訴, 劉姓犯嫌則未經移送而被縱放 ,丁政豪及李永龍復於檢察官 偵辦時虛偽陳述,及至法院審 理時始查悉上情,違法濫權情 節重大,嚴重戕害警界形象, 均核有重大違失。 尚未裁判。
監察院公報【第3058 期】 ‧68‧ 案號 被彈劾人 案由 懲戒機關 裁判情形 姓名 職別 (相當委任第5 職等);現 任桃園市政府警察局平鎮分 局平鎮派出所警員。 106 年劾字 第24 號 王水川 彰化縣和美鎮前鎮長,比照 簡任第10 職等;已於103 年12 月25 日卸任。 被彈劾人王水川擔任彰化縣和 美鎮鎮長期間,於103 年6 月 4 日僱用三親等姻親陳○詒擔 任該鎮公所清潔隊技工,復於 103 年9 月29 日轉調至該鎮公 所工友,違反公開甄選、迴避 及轉調等相關法令;又被彈劾 人於同日轉化一親等姻親林○ 玲擔任該鎮公所技工而未予迴 避,違反行政程序法第32 條第 1 款及公務員服務法第17 條等 規定,核有重大違失。 尚未裁判。 106 年劾字 第25 號 徐正男 原臺南縣佳里鎮公所鎮長, 比照簡任第十職等(民國 99 年12 月25 日退職)。 徐正男負責綜理原臺南縣佳里 鎮公所業務,對於該公所辦理 限制性招標之公共工程,擁有 指定參與比價廠商之權限,卻 基於圖特定廠商私人不法利益 之犯意聯絡,於工程發包前, 事先內定特定廠商為得標廠商 ,再通知配合廠商參與虛偽比 價,使特定廠商順利得標圖得 不法利益,嚴重敗壞法紀及機 關形象。 尚未裁判。
FD06157 | 2015_台湾_桃园新屋保龄球馆火灾_监察院调查报告.pdf
分类:06_境外及港澳台调查报告 | 年份:2015 | 地域:台湾 | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
1
調 查 報 告
壹、案 由:104年1月20日凌晨2時,桃園市新屋區疑似違 建且無營業登記之亞洲保齡球館發生火警, 消防局動員大批人力搶救,6名年輕消防隊員 卻不幸殉職,凸顯國內消防救災作業存有諸 多問題等情案。 貳、調查意見: 「民國(下同)104年1月20日凌晨2時,桃園市新屋區 疑似違建且無營業登記之亞洲保齡球館發生火警,消防 局動員大批人力搶救,6名年輕消防隊員卻不幸殉職,凸 顯國內消防救災作業存有諸多問題等情案」乙案,本院 於104年1月29日履勘案發現場並聽取桃園市政府(103 年12月25日改制前為桃園縣政府)各機關簡報,同年2 月26日諮詢相關專家學者,嗣後分冸函請內政部消防署 、桃園市政府所屬消防局、政風處、工務局、都市發展 局 1、經濟發展局、農業發展局、警察局楊梅分局,及台 灣自來水股份有限公司第二區管理處等調閱有關卷證資 料,並函請臺灣桃園地方法院、臺灣桃園地方法院檢察 署(下禒桃園地檢署)提供相關偵查卷證,再函請內政 部警政署刑事警察局、法務部調查局協助影像辨識。復 於105年3月14日至15日、4月15日分冸詢問桃園市政府所 屬工務局、經濟發展局、原城鄉發展處、都市發展局、 農業發展局、消防局及桃園市新屋鄉公所等機關時任承 辦及各級主管主管人員計41人次,同年5月24日詢問桃園 市政府時任秘書長游建華及該府各局處相關人員、內政 部消防署署長葉卲堂及所屬人員等計35人次,同年7月1 日接受社團法人中華民國消防員工作權益促進協會(下 禒消防員工作權益促進會)及殉職家屬陳情及訪談計11
1 97 年1 月16 日都市發展局改制城鄉發展處。100 年1 月1 日桃園縣升格準直轄市,城鄉發 展處改制為城鄉發展局。103 年12 月25 日桃園縣升格直轄市,城鄉發展局改名為都市發展 局。
2
人,同年8月18日詢問消防員工作權益促進會所建議人員 ;又為釐清消防設備、車輛狀況及用水調度等疑義,經 本案調查委員指示本院協查人員多次持證前往桃園市政 府消防局暨所屬第二救災救護大隊新屋分隊(下禒新屋 分隊)、及是日出勤消防人員處所等,進行詢問、訪談 及消防車輛實地演練等,並由桃園市政府消防局補充卷 證資料至院,再於106年8月30日詢問該府消防局局長胡 英達等計13人次、訪談消防員工作權益促進會代表人員 ,業已調查竣事,臚列調查意見如下: 一、發生本件火災之本案建物核准面積僅819.47帄方公 尺,完成之建物面積竟高達5,338.37帄方公尺。桃園 市政府之前身為桃園縣政府工務局於83年10月19日 核發本案建物之使用執照時,即知本案建物尚有未完 成建物存在,且該府核發使用執照不到2個月,其稅 務局即自83年12月起課本案建物面積5,188帄方公尺 之房屋稅。本案建物之核准面積部分係與違建部分同 時建造,成為一個不可分割之建物,且違建面積高達 84.65%,合法面積僅15.35%,違建部分坐落於農業區 ,用目測即知本案建物之主要構造與設計圖樣顯不相 符,依法不得核發使用執照,該府工務局竟違法核發 使用執照,核有重大違失。 (一)92年6月5日修正前之建築法第11條第1項前段規定 :「本法所禒建築基地,為供建築物本身所占之地 面及其所應留設之法定空地。」60年12月22日修正 之建築法第26條第1項規定:「直轄市、縣(市) (局)主管建築機關依本法規定核發之執照,僅為 對申請建造、使用或拆除之許可。」73年11月7日 修正之建築法第70條第1項本文規定:「建築工程 完竣後,應由起造人會同承造人及監造人申請使用 執照。直轄市、縣(市)(局)主管建築機關應自接到 申請之日起,10日內派員查驗完竣。其主要構造、
3
室內隔間及建築物主要設備等與設計圖樣相符者 ,發給使用執照,並得核發謄本;不相符者,一次 通知其修改後,再報請查驗。」65年1月8日修正之 建築法第71條規定:「申請使用執照,應備具申請 書,並檢附左列各件:一、原領之建造執照或雜項 執照。二、建築物竣工帄面圖及立面圖(第1項)。 建築物與核定工程圖樣完全相符者,免附竣工帄面 圖及立面圖(第2項)。」 (二)經查本案保齡球館所在之建築物(下禒本案建物) ,於96年1月25日門牌改編為新屋鄉中興北路101號 ,係坐落桃園市新屋區中正段434~439、442地號土 地,位於「新屋都市計畫」內,部分為住宅區、部 分為農業區,如下圖都市計畫圖所示(黃色住宅區 、綠色農業區):
本案原申請核准用途與自行違建面積統計: 原核准圖說 自行違建面積 使用 分區 位於住宅區 含跨農業區+住宅區 用途 第一層自用游泳池 第二層住宅 第一層游泳池(營業用) 第二層保齡球館 面積 第一層439.82 m² 第二層379.65 m² 合計:819.47 m² 第一層2,317.9 m² 第二層2,201.0 m² 合計:4,518.9 m²
4
合計 使用 面積 第一層:439.82+2,317.9=2,757.72 m² 第二層:379.65+2,201.0=2,580.65 m² 合計:819.47(15.35%)+4,518.9(84.65%)=5,338.37m²(100%) 備註:資料來源:桃園市政府。現況面積資料來源為地方稅務局房屋稅籍證明書 ,登載自83年12月起新屋鄉中正段437地號(農業區)、執照號碼(83)桃縣 工建使字第01392號。
(三)有關本案建物之建造執照與使用執照情形,桃園縣 政府工務局於83年8月10日核發(83)桃縣工建執照 字第0940號建造執照(坐落新屋鄉中正段435、436 、437地號)。起造人黃明珠,經所有權人黃彭菊英 同意,於同年8月31日申請使用執照(地址:新屋鄉 新生村中正路110巷95弄24之3號;地號:新屋鄉中 正段435、436、437號)。縣府工務局於83年10月19 日核發(83)桃縣工建使字第01392號使用執照(地 號:新屋鄉中正段435、436、437號),執照並註記 :第一層用途為自用游泳池,不得對外營業(合法 面積為439.82帄方公尺),第二層為住宅(合法面積 為379.65帄方公尺)。該使用執照卷附照片顯示, 該案之建築基地外有未完成之建築物存在,再依據 該府稅務局房屋稅籍證明書所載,起課日期由83年 12月起課,面積計5,188帄方公尺,顯見該已完成 及未完成之建物係同時建造。
5
(83)桃縣工建使字第01392號使用執照圖說 (四)詢據桃園市政府104年2月26日府消救字第1040037 301號函復本院說明禒:該農地違建因非屬該次使 用執照之申請之基地範圍內,依法尚無涉及該使用 執照之核發,申請人針對申請地請領使用執照,相 關建築法規尚無因鄰地(地號:新屋區中正段434 、437、438、442號等4筆地號)存有違建而拒絕核 發建築執照之規定,且該違建坐落於申請基地範圍 外,各相關法令亦無類似得以鄰地(非屬申請範圍) 違規(建)而限制土地申請建築執照之連結云云。 (五)惟查,該違築物核准面積僅819.47帄方公尺(第一 層439.82m²+第二層379.65m²),但完成之建物面積 竟高達5,338.37帄方公尺(第一層2,757.72m²+第二 層2,580.65m²)。再者,桃園縣政府於83年10月19 日核發本案建物之使用執照時,本案建物即有未完 成建物存在,且該府核發使用執照不到2個月,其 稅務局即自83年12月起課本案建物面積5,188帄方 公尺之房屋稅。因此,本案建物之核准部分係與違 建部分同時建造,成為一個不可分割之建物,且違
6
建面積高達84.65%,合法面積僅15.35%,違建部分 坐落於農業區,用目測即知本案建物之主要構造與 設計圖樣顯不相符,依法不得核發使用執照,該府 工務局竟違法核發使用執照,核有重大違失。 二、桃園縣新屋鄉公所承辦徐慧玲於99年8月5日明知設 於本案建物內之「佳宜音樂餐坊」違物面積4,518帄 方公尺,卻僅向縣府城鄉發展處陳報位於住宅區之面 積132帄方公尺,顯有違誤。桃園縣政府城鄉發展處 於99年9月15日以違反都市計畫法裁處「佳宜音樂餐 坊」罰鍰6萬元,命立即停止非法使用及1個月內恢復 原狀,並副知新屋鄉公所請其持續追蹤複查土地使用 改善情形,該公所承辦張孆升及其課長黃仁勳於簽呈 「持續追蹤管理」後,卻未切實追蹤列管,該處承辦 陳志明、科長莊敬權及處長李永展未切實督導,亦有 疏失。 (一)91年12月11日修正之都市計畫法第79條規定第1項 :「都市計畫範圍內土地或建築物之使用,或從事 建造、採取土石、變更地形,違反本法或內政部、 直轄市、縣(市)(局)政府依本法所發布之命令者, 當地地方政府或鄉、鎮、縣轄市公所得處其土地或 建築物所有權人、使用人或管理人新臺幣6萬元以 上30萬元以下罰鍰,並勒令拆除、改建、停止使用 或恢復原狀。不拆除、改建、停止使用或恢復原狀 者,得按次處罰,並停止供水、供電、封閉、強制 拆除或採取其他恢復原狀之措施,其費用由土地或 建築物所有權人、使用人或管理人負擔。」89年1 月26日修正之同法第80條規定:「不遵前條規定拆 除、改建、停止使用或恢復原狀者,除應依法予以 行政強制執行外,並得處6個月以下有期徒刑或拘 役。」101年11月12日修正前之都市計畫法臺灣省 施行細則第29條第1項本文規定:「農業區為保持
7
農業生產而劃定,除保持農業生產外,僅得申請興 建農舍、農業產銷必要設施或休閒農業設施。」10 5年4月25日修正前之該條項本文規定:「農業區為 保持農業生產而劃定,除保持農業生產外,僅得申 請興建農舍、農業產銷必要設施、休閒農業設施及 農村再生相關公共設施。」105年4月25日修正之該 條項本文規定:「農業區為保持農業生產而劃定, 除保持農業生產外,僅得申請興建農舍、農業產銷 必要設施、休閒農業設施、自然保育設施、綠能設 施及農村再生相關公共設施。」99年2月1日日修正 前該細則第15條第1項規定:「住宅區為保護居住 環境而劃定,不得為下列建築物及土地之使用:… …十、…視聽歌唱場、遊藝場、歌廳、保齡球館… 。十一、舞廳(場)、酒家、酒吧(廊)…或其他 類似之營業場所。……二十二、其他經縣(市)政府 認為足以發生噪音、振動、特殊氣味、污染或有礙 居住安寧、公共安全或衛生並公告限制之建築物或 土地之使用」。101年11月12修正前之該條項規定 :「住宅區為保護居住環境而劃定,不得為下列建 築物及土地之使用:……十…歌廳、保齡球館…。 十一、舞廳(場)、酒家、酒吧(廊)…或其他類 似之營業場所。……二十三、其他經縣(市)政府認 為足以發生噪音、振動、特殊氣味、污染或有礙居 住安寧、公共安全或衛生並公告限制之建築物或土 地之使用。」105年4月25日修正前之該條項規定: 「住宅區為保護居住環境而劃定,不得為下列建築 物及土地之使用:……十…歌廳、保齡球館…。十 一、舞廳(場)、酒家、酒吧(廊)…或其他類似 之營業場所。……二十三、其他經縣(市)政府認 定足以發生噪音、振動、特殊氣味、污染或有礙居 住安寧、公共安全或衛生,並依法律或自治條例限
8
制之建築物或土地之使用。」農業發展條例第69條 第1項規定:「農業用地違反區域計畫法或都市計 畫法土地使用管制規定者,應依區域計畫法或都市 計畫法規定處理」。準此,農業區不得違反農業生 產使用,住宅區不得為保齡球館、視聽歌唱場等類 似營業場所之使用,違反規定者依都市計畫法第79 、80條規定處分。 (二)本案違反都市計畫法及都市計畫法臺灣省施行細 則規定,新屋鄉公所人員查核不實,違失如下: 1、新屋鄉公所承辦徐慧玲於99年8月5日明知設於 本案建物內之「佳宜音樂餐坊」,違建面積合計 達5,338.37平 方公尺 方公尺,卻僅向縣府城鄉發展處陳 報本案建物位於住宅區之面積132平方公尺,顯 有違誤。 (1)99年7月16日桃園縣政府警察局楊梅分局查報 新屋鄉中興北路101號2樓「佳宜音樂餐坊」未 辦理營業登記且違規經營視聽歌唱業情形,函 請該府工商發展處、地政處、工務處、財政部 台灣省北區國稅局楊梅稽徵所依權責裁處。該 府地政處承辦李校琛於99年7月21日函轉主管 機關城鄉發展處核處,說明中興北路101號經 營「佳宜音樂餐坊」案內土地屬於都市計畫範 圍內土地,請本於權責核處。99年7月26日城 鄉發展處承辦林國強以府城行字第099028661 5號函請新屋鄉公所協助查報,99年8月5日新 屋鄉公所承辦徐慧玲函 2復城鄉發展處稱:本案 :本案 違反都市計畫住宅區土地使用分區管制等規 定(土地坐落新屋區中正段地號436、439,面 積132平 方公尺 方公尺)等語。然查本案建物面積達5, 338.37平 方公尺 方公尺,其中違建部分高達84.65%,
2 99 年8 月5 日桃新鄉城字第0990014362 號函。
9
該函所附之照片卻僅拍保齡球館門口,徐慧玲 竟僅查報「佳宜音樂餐坊」之住宅區地號436 、439地號面積132平 方公尺,忽視建築整體性 方公尺,忽視建築整體性 ,對於農業區大型違建面積達4,518餘平 方公 方公 尺隻字不提。 (2)徐慧玲於本院詢問坦承:當時收到公文就過去 現場看過,我去查報時是針對違規使用面積, 是報給縣府違規使用面積等語。該公所顯查報 不實,僅看住宅區違規使用面積132平 方公尺 方公尺 ,未能切實查核違建範圍,顯有違失。 2、城鄉發展處於99年9月15日以違反都市計畫法裁 處「佳宜音樂餐坊」罰鍰6萬元,命立即停止非 法使用及1個月內恢復原狀,並副知新屋鄉公所 請其持續追蹤複查土地使用改善情形,該公所承 辦張孆升及其課長黃仁勳於簽呈「持續追蹤管 理」後,卻未切實追蹤列管,該處承辦陳志明、 科長莊敬權 3及處長李永展 4未切實督導,亦有疏 失。 (1)99年8月12日城鄉發展處承辦陳志明以府城行 字第0990304094號函,請「佳宜音樂餐坊」負 責人葉桂英對於違反土地使用分區,於文到10 日內陳述意見,請立即停止非法使用。99年9 月15日陳志明認定「佳宜音樂餐坊」違反都市 計畫法臺灣省施行細則第15條規定,依都市計 畫法第79條,處罰鍰6萬元,立即停止非法使 用,以及1個月內恢復原狀,並副知新屋鄉公 所、楊梅分局持續追蹤複查土地使用改善情形 (該府99年9月15日府城行字第0990363934號 裁處書;後於99年10月11日全數繳納)。
3 城鄉發展處處行政科莊敬權任期:97.12.15-103.9.10。 4 城鄉發展處處長李永展任期:96.10.1-100.2.28。
10
(2)桃園縣都市計畫土地違規使用裁罰流程明載 :「備註:鄉鎮公所列管事項:1.查察違規案 件是否於該府規定期限內拆除、改建、停止使 用或恢復原狀。2.屆期未恢復原狀案件,由公 所查報該府城鄉發展處開立第二階段處分書 並移請該府工務處執行斷水斷電。」新屋鄉公 所於收受上開副本後,簽擬「持續追蹤管理」 (承辦人書記張孆升、城鄉課代理課長黃仁勳 決行),惟後續竟未依法切實追蹤列管,勒令 停止使用及1個月內恢復原狀,顯有違誤。 (3)據此,本院詢問時,新屋鄉公所承辦人稱 :徐 :徐 慧玲受官等訓練5週,暫接其工作一個月,後 來於10月初回臺北待產,對此業務只是接公文 及問別人,該工作與原任職戶政工作不相關, 人,該工作與原任職戶政工作不相關, 故不熟悉。因快生了,所以沒有去現場;當時 公文是副本,故為存查。公所是提供協助,當 時接任該業務,還在學習中,又育嬰假約一年 半後調職,故無印象等語,該公所承辦課長黃 仁勳稱:前面公文只是協助辦理而已,沒有去 :前面公文只是協助辦理而已,沒有去 過現場,都由承辦人員徐慧玲去等語。 (4)有關縣府城鄉處是否落實追蹤督導乙節,詢據 縣府城鄉處承辦陳志明稱:都是副知查報單位 :都是副知查報單位 等語。縣府時任科長莊敬權稱:我是當時科長 :我是當時科長 ,裁罰為上一層決行,幾乎都是處長(李永展 )決行,如請假才由副處長。後續是否停止使 用,這部分委由公所協助,沒有督導公所是我 們的錯等語。時任處長李永展稱:作法是有人 :作法是有人 檢舉時,會去看再去開罰,但人力不足,會由 公所或警察局追蹤,公所或警察局沒有回報。 裁罰書正本是給土地所有權人,要求依都市計 畫法規定辦理,如持續檢舉可以再罰。沒有一
11
件是去繼續裁罰的,96-100年間是否只有處分 一次,本案沒有主動去瞭解有無恢復原狀,受 限於人力不足。科長會報告裁罰案件數,但我 們人力光是處理違規事實案件數就難以負荷 等語。城鄉發展局局長吳啟民稱:未處罰部分 :未處罰部分 是因為人力不足,故無法主動去稽查或複查等 語。莊敬權及李永展於本院詢問時均坦承沒有 督導公所是我們的錯等語。 (5)承辦張纓升及課長黃仁勳均坦承,本案新屋鄉 公所未依法切實追蹤列管本案建物,未依法勒 令停止使用及1個月內恢復原狀,其辦理過程 顯有違誤。依98年之分層負責明細表,縣府城 鄉發展處關於違反土地使用分區之業務,應由 處長核定,時任該處承辦陳志明、科長莊敬權 5及處長李永展 6皆未切實執行追蹤督導,致錯 失即時遏止之契機,均有疏失。 三、桃園縣政府城鄉發展局於102年間依新屋鄉公所函復 及農業發展局之查復函文,明知劉得斌於都市計畫住 宅區及農業區違規興建本案建物,違法做為保齡球館 、電動玩具店使用,違反土地使用管制規定之事實後 ,於102年8月29日函請行為人說明,該行為人未如期 陳述,該局竟未依都市計畫法第79條規定裁罰,並勒 令拆除、改建、停止使用或恢復原狀。嗣該局於103 年8月15日收受農業發展局函文請其對違反農業使用 依權責核處後,竟於同月21日發文請農業發展局依權 責輔導合法使用。農業發展局於103年12月2日因現勘 後仍未改善再函請城鄉發展局對違反農業使用請依 法核處後,城鄉發展局於103年12月19日函請行為人 陳述意見,違規人未如期陳述意見後,該局竟仍未依
5 城鄉發展處行政科莊敬權任期:97.12.15-103.9.10。 6 城鄉發展處處長李永展任期:96.10.1-100.2.28。
12
都市計畫法第79條規定裁罰,並勒令拆除、改建、停 止使用或恢復原狀。該局遲至104年1月20日本案建物 於凌晨2點大火,造成6名消防隊員死亡後,始於104 年1月20日裁罰7萬元,該局長期放任業者違反都市計 畫法於農業區及住宅區內經營保齡球館,致釀災害慘 劇,洵有違失。承辦林國強懈怠職務,縱容包庇,核 有重大違失;科長莊敬權在公文核章,怠忽職守,有 嚴重違失;局長吳啟民、核定決行技正宋仲浩均未盡 督導之責,亦有違失。 (一)如前所述,91年12月11日修正之都市計畫法第79條 規定第1項:「都市計畫範圍內土地或建築物之使 用,或從事建造、採取土石、變更地形,違反本法 或內政部、直轄市、縣(市)(局)政府依本法所發布 之命令者,當地地方政府或鄉、鎮、縣轄市公所得 處其土地或建築物所有權人、使用人或管理人新臺 幣6萬元以上30萬元以下罰鍰,並勒令拆除、改建 、停止使用或恢復原狀。不拆除、改建、停止使用 或恢復原狀者,得按次處罰,並停止供水、供電、 封閉、強制拆除或採取其他恢復原狀之措施,其費 用由土地或建築物所有權人、使用人或管理人負擔 。」89年1月26日修正之同法第80條規定:「不遵 前條規定拆除、改建、停止使用或恢復原狀者,除 應依法予以行政強制執行外,並得處6個月以下有 期徒刑或拘役。」101年11月12日修正前之都市計 畫法臺灣省施行細則第29條第1項本文規定:「農 業區為保持農業生產而劃定,除保持農業生產外, 僅得申請興建農舍、農業產銷必要設施或休閒農業 設施。」105年4月25日修正前之該條項本文規定: 「農業區為保持農業生產而劃定,除保持農業生產 外,僅得申請興建農舍、農業產銷必要設施、休閒 農業設施及農村再生相關公共設施。」105年4月25
13
日修正之該條項本文規定:「農業區為保持農業生 產而劃定,除保持農業生產外,僅得申請興建農舍 、農業產銷必要設施、休閒農業設施、自然保育設 施、綠能設施及農村再生相關公共設施。」101年1 1月12日修正前該細則第15條第1項規定:「住宅區 為保護居住環境而劃定,不得為下列建築物及土地 之使用:……十、…視聽歌唱場、遊藝場、歌廳、 保齡球館…。十一、舞廳(場)、酒家、酒吧(廊 )…或其他類似之營業場所。……二十二、其他經 縣(市)政府認為足以發生噪音、振動、特殊氣味、 污染或有礙居住安寧、公共安全或衛生並公告限制 之建築物或土地之使用」。105年4月25日修正前之 該條項規定:「住宅區為保護居住環境而劃定,不 得為下列建築物及土地之使用:……十…歌廳、保 齡球館…。十一、舞廳(場)、酒家、酒吧(廊) …或其他類似之營業場所。……二十三、其他經縣 (市)政府認為足以發生噪音、振動、特殊氣味、污 染或有礙居住安寧、公共安全或衛生並公告限制之 建築物或土地之使用。」105年4月25日修正前之該 條項規定:「住宅區為保護居住環境而劃定,不得 為下列建築物及土地之使用:……十…歌廳、保齡 球館…。十一、舞廳(場)、酒家、酒吧(廊)… 或其他類似之營業場所。……二十三、其他經縣( 市)政府認定足以發生噪音、振動、特殊氣味、污 染或有礙居住安寧、公共安全或衛生,並依法律或 自治條例限制之建築物或土地之使用。」農業發展 條例第69條第1項規定:「農業用地違反區域計畫 法或都市計畫法土地使用管制規定者,應依區域計 畫法或都市計畫法規定處理」。準此,農業區不得 違反農業生產使用,住宅區不得為保齡球館、視聽 歌唱場等類似營業場所之使用,違反規定者依都市
14
計畫法第79、80條規定處分。 (二)城鄉發展局於102年間依新屋鄉公所函復及農業發 展之查復函文,知悉「新屋保齡球館」所在之建物 坐落農業區及住宅區,違反土地使用管制規定後, 於102年8月29日函請行為人說明,該行為人未如期 陳述,該局竟未依都市計畫法第79條規定裁罰,並 勒令拆除、改建、停止使用或恢復原狀,承辦林國 強、科長莊敬權、核定決行技正宋仲浩均怠忽職權 ,顯有違失。該局長吳啟民綜理局務,未切實督導 ,亦有疏失。 1、102年8月5日縣府工商發展局(承辦:楊欣怡) 依據財政部北區國稅局102年7月31日函,函 7請新 屋保齡球館負責人因未依法申辦商業設立登記 即經營「電動玩具店」,請於15日內辦理商業登 記,並副知該府城鄉發展局等機關(警察、衛生、 環保、地政、社會、該局工商輔導科)。城鄉發 展局於102年8月7日以桃城行字第1020014356號 函請新屋鄉公所查報「新屋保齡球館」有無違反 土地使用分區管制規定情事,102年8月13日新屋 鄉公所(承辦:黃麗月)以桃新鄉城字第102001 7937號函復城鄉發展局,說明該址中興北路101 號2F坐落農業區及住宅區,疑似違反土地使用管 制規定。102年8月20日城鄉發展局(承辦林國 強;後由科長決行)府城行字第1020207428號函 請農業發展局針對前開農業區(中正段434、43 7、438及442等地號)興建建築物認定有無妨礙農 業生產情形,102年8月21日農業發展局(承辦張 甄晏)桃農管字第1020017832號函復城鄉發展局 稱 : :434、437、438、442農業區地號興建建築物 供營業用已非符農業使用行為,依農業發展條例
7 102 年8 月5 日桃商登字第1020022416 號函。
15
第69條規定,請城鄉發展局依都市計畫法規定處 理等語。102年8月29日城鄉發展局(承辦林國 強;科長莊敬權)以府城行字第1020212317號函 請行為人劉得斌對於(434~439、442地號)違反 土地使用分區管制,請於文到10日內陳述意見或 提供行為人資料,該函後由技正宋仲浩代表機關 決行(依據102年分層負責明細表係機關首長核 定決行)。惟行為人未如期陳述,該府城鄉發展 局竟未依法裁罰或依法勒令斷水斷電,亦未追蹤 違反土地使用分區之農業區違建部分,承辦林國 強、科長莊敬權、核定決行技正宋仲浩均有違失。 2、本院詢問時,宋仲浩稱: :102.8.29函文有發出 去,行為人後來有無陳述我不清楚,因全局公文 很多,我沒有負責後續追蹤,應由業務單位行政 科自行控管等語。吳啟民稱:沒有陳述意見就開 :沒有陳述意見就開 罰,實務上沒有嚴格的研考機制,事實上由主辦 同仁處理,是承辦人員的疏失等語。 3、查102年8月13日新屋鄉公所函復城鄉發展局 稱 :「新屋保齡球館」所在之建物, :「新屋保齡球館」所在之建物,坐落農業區 及住宅區,疑似違反土地使用管制規定。農業發 展局於同月21日函復該局稱: :434、437、438、4 42農業區地號興建建築物供營業用已非符農業 使用行為,依農業發展條例第69條規定,請城鄉 發展局依都市計畫法規定處理等語。該局於102 年8月29日函請行為人說明,該行為人未如期陳 述,該府城鄉發展局竟未依都市計畫法第79條規 定裁罰,並勒令拆除、改建、停止使用或恢復原 狀,承辦林國強懈怠職務,核有重大違失;科長 莊敬權在公文核章,怠忽職守,有嚴重違失;依 100、101、102年分層負責明細表,違反土地使 用分區業務係局長核定,局長吳啟民、核定決行
16
技正宋仲浩未均盡督導之責,亦有違失。 (三)城鄉發展局明知劉得斌於「都市計畫住宅區、農業 區」違規興建本案建物,違法做為保齡球館、電動 玩具店營業使用之事實,卻於接獲103年8月15日農 業發展局函文請其對違反農業使用依權責核處後 ,於同月21日發文請農業發展局依權責輔導合法使 用。農業發展局於103年12月2日因現勘後仍未改善 再以函請城鄉發展局對違反農業使用請依法核處 ,城鄉發展局於103年12月19日函請行為人陳述意 見,違規人未如期陳述意見後,該局仍未依都市計 畫法第79條規定裁罰,並勒令拆除、改建、停止使 用或恢復原狀。遲至104年1月20日本案建物於凌晨 2點大火,造成6名消防隊員死亡後,城鄉發展局始 於104年1月20日裁罰7萬元,該局承辦林國強、科 長莊敬權、局長吳啟民,核重大違失。 1、103年8月15日農業發展局依該市農地違規處理 原則於103年8月15日以桃農管字第1030017071 號函請土地所有權人劉○○應於103年11月20日 前取得合法設立(使用)文件或恢復農業使用狀 態,並副知工商發展局、工務局、體育處協助輔 導合法使用。另因該址違規使用土地中有3筆(中 正段435、436、439地號)係屬都市計畫住宅區, 該局103年8月15日桃農管字第10300170711號函 請城鄉發展局依權責核處。103年8月21日城鄉發 展局(承辦林國強;科長莊敬權;都發局長吳啟 民 8)竟再發文農業發展局(1030015349號)稱: : 有關434、437、438、442地號土地興建做營業使 用,請貴局依權責輔導合法使用,如經輔導仍屬 違規使用者,再行將輔導紀錄及相關事證送城鄉 局辦理後續裁罰事宜。據此,城鄉發展局竟仍未
8 城鄉發展局局長吳啟民任期:100.3.1-103.6.2、103.7.28-103.12.24。
17
依法裁罰或勒令停止使用並恢復原狀,延誤辦理 時機。農業發展局於103年12月2日辦理現勘,因 現勘後仍未改善,再以桃農管字第1030026368號 函(承辦張甄晏)城鄉發展局本案已違反農業使 用請依法核處。城鄉發展局(承辦林國強;科長 莊敬權;局長吳啟民)未依法裁罰或斷水電,10 3年12月19日函 9稱 : :劉得斌於「都市計畫住宅區、 農業區」(新屋鄉中正段434至439號、442號地號) 違規興建建築物、營業使用(保齡球館、電動玩 具店),違反都市計畫法臺灣省施行細則第15 條、第29條規定,應於文到10日內陳述意見等 語。惟違規人仍未如期陳述意見,該局未依都市 計畫法第79條規定裁罰,並勒令拆除、改建、停 止使用或恢復原狀,未有何行政作為。 2、本院詢問時,委員詢問:當時依公所查報資料即 可裁罰,為何仍要移農業發展局?承辦林國強 稱:當時的確有延誤。科長莊敬權稱 :當時只有 :當時只有 2個承辦負責且兼辦全桃園市的違規等語。局長 吳啟民稱:未連續處罰部分是因為人力不足,故 :未連續處罰部分是因為人力不足,故 無法主動去稽查或複查等語。 3、查103年8月15日農業發展局函請城鄉發展局依 權責核處後,城鄉發展局竟於同月21日發文請農 業發展局依權責輔導合法使用,如經輔導仍屬違 規使用者,再行將輔導紀錄及相關事證送城鄉局 辦理後續裁罰事宜。據此,城鄉發展局竟仍未依 法裁罰並勒令拆除、改建、停止使用或恢復原 狀,延誤辦理時機。農業發展局於103年12月2日 因現勘後仍未改善再以函請城鄉發展局稱 : :本案 已違反農業使用請依法核處。城鄉發展局於103 年12月19日函稱:劉得斌於「都市計畫住宅區、 :劉得斌於「都市計畫住宅區、
9 城鄉發展局103 年12 月19 日府城行字第1030313827 號函。
18
農業區」(新屋鄉中正段434至439號、442號地號) 違規興建建築物、營業使用(保齡球館、電動玩 具店),違反都市計畫法臺灣省施行細則第15 條、第29條規定,應於文到10日內陳述意見等 語。惟違規人仍未如期陳述意見,該局仍未依都 市計畫法第79條規定裁罰,並勒令拆除、改建、 停止使用或恢復原狀,未有何行政作為。城鄉發 展局放任違規繼續擴大蔓延,縱容包庇。遲至10 4年1月20日本案建物於凌晨2點大火,造成6名消 防隊員死亡後,城鄉發展局始以104年1月20日府 都行字第1040016307號裁處書(承辦林國強)針 對434~439、442地號建物營業使用(保齡球館、 電動玩具店)違反都市計畫法臺灣省施行細則第 15、29條規定裁罰7萬元,核重大違失。承辦林 國強懈怠職務、縱容包庇,核有重大違失;科長 莊敬權在公文核章,怠忽職守,有嚴重違失;局 長吳啟民未盡督導之責,亦有違失。 四、桃園縣政府工務局於86年11月5日稽查時發現本案建 物有違法使用經營亞洲保齡球館情形,竟僅拆除「通 道木門加栓乙扇、安全門加設木門乙扇」,未依法將 亞洲保齡球館拆除。該局於95年8月16日以本案建物 違法使用經營「亞洲音樂餐坊」而依建築法規定裁罰 6萬元,並命恢復原狀或補辦手續後,竟僅發函催繳 罰鍰,未依法連續處罰,並限期停止其使用,且遲至 100年3月21日始移送強制執行繳清罰款。該局於101 年2月14日、101年8月3日兩次收受消防局指禒本案建 物違規使用經營新屋保齡球館請派員至現場查處之 函文後,竟均將公文存查,且未派員依法查察。該局 因102年度聯合稽查時,設於本案建物1樓之「新亞洲 游泳池」與使用執照之面積及不得對外營業等記載均 顯不相符,竟草率記載複查合格。該局於103年6月19
19
日聯合稽查時,明知「新亞洲游泳池」違規使用,竟 於103年度桃園縣公私立游泳池查核結果一覽表中登 載初查符合建築法,複查結果竟違法登記為「符合」 。該局如附表二所示之相關承辦人員核有重大違失, 相關科長、局長郭振寰督導不周均有疏失。 (一)73年11月7日修正之建築法第70條第1項前段規定 :「建築工程完竣後,應由起造人會同承造人及監 造人申請使用執照。」73年11月7日修正之同法第7 2條規定:「供公眾使用之建築物,依第七十條之 規定申請使用執照時,直轄市、縣(市)(局)主管建 築機關應會同消防主管機關檢查其消防設備,合格 後方得發給使用執照」。所謂供公眾使用之建築物 ,依60年12月22日修正之同法第5條之規定:「本 法所禒供公眾使用之建築物,為供公眾工作、營業 、居住、遊覽、娛樂及其他供公眾使用之建築物。 」60年12月22日修正之同法第96條第1項本文規定 :「本法施行前,供公眾使用之建築物而未領有使 用執照者,其所有權人應申請核發使用執照」。又 84年8月2日修正之同法第77條第1項規定:「建築 物所有權人、使用人應維護建築物合法使用與其構 造及設備安全」。所謂「合法使用」,依內政部95 年7月17日台內營字第0950804329號函,係指「建 築物應符合其現況用途之構造與設備標準」。違反 第77條第1項規定者,92年6月5日修正之同法第91 條第1項第2款之規定:「處建築物所有權人、使用 人、機械遊樂設施之經營者新臺幣6萬元以上30萬 元以下罰鍰,並限期改善或補辦手續,屆期仍未改 善或補辦手續而繼續使用者,得連續處罰,並限期 停止其使用。必要時,並停止供水供電、封閉或命 其於期限內自行拆除,恢復原狀或強制拆除」。該 條第2項規定:「有供營業使用事實之建築物,其
20
所有權人、使用人違反第77條第1項有關維護建築 物合法使用與其構造及設備安全規定致人於死者 ,處1年以上7年以下有期徒刑,得併科新臺幣100 萬元以上500萬元以下罰金;致重傷者,處6個月以 上5年以下有期徒刑,得併科新臺幣50萬元以上250 萬元以下罰鍰。」 (二)次按加強建築物公共安全檢查及取締執行要點(內 政部87年11月9日訂定、100年10月7日修正)第4點 規定: 「……各級目的事業主管機關並應就負責稽 查取締項目,確實依照各該主管法規處理(一)未 經登記即行開業者,依公司法、商業登記法及各目 的事業主管機關法規處理。(二)違反土地使用分 區管制者,依區域計畫法、都市計畫法及其施行細 則等有關規定辦理。(三)未經許可擅自修建、改 建或裝修者,依建築法有關規定處理。」第5點規 定:「建築物有下列情形之一者,應依相關規定從 嚴處理:(一)建築物構造與設備安全檢查合格, 而有擅自變更使用類組及用途者,應依下列規定辦 理:1.擅自變更使用用途符合土地使用管制之容許 使用項目,依本法第91條第1項第1款規定,處建築 物所有權人或使用人新臺幣6萬元以上30萬元以下 罰鍰,並限期補辦手續,屆期未補辦手續而繼續使 用,得連續處罰。必要時,停止其供水供電」。依 同要點附表二明文規範:所謂B-1類之認定原則係 指「供娛樂消費,處封閉或半封閉場所」。(應清 查業冸:卡拉OK等視聽歌唱業。)並列為第一順序 。保齡球館為D-1類,認定原則係指「供低密度使 用人口運動休閒之場所」。據此,依上開規定視聽 歌唱業B1類組或D-1類之保齡球館,各縣市政府應 依法加強建築物公共安全檢查,並通報及取締不法 。
21
(三)本案建物違規營業使用,該府工務局歷年稽查不實 ,放任農業區大型違章建築釀災,違失如下: 1、該府工務局於86年11月5日稽查時發現本案大型 違建,竟未落實執法,僅拆除「通道木門加栓乙 扇、安全門加設木門乙扇」,亞洲保齡球館未拆, 時任承辦人員陳建業 10,隊長古沼格顯有違失。 (1)縣府工務局86年11月5日拆除日誌記載,該局 工程隊公共安檢組陳建業技工(103年7月屆齡 退休)配合八大行業聯合稽查小組稽查4家營 業場所,並帶領拆除人員2名(工務局時任承 辦人員陳建業,隊長古沼格,局長劉永和), 執行情形明載:「1、新屋鄉中興北路101號2 樓新亞洲音樂茶坊(拆除通道木門加栓乙扇、 安全門加設木門乙扇)。……3、亞洲保齡球館 未拆」。 (2)由上述資料顯示,該府工務局發現本案大型違 建存在,竟未落實執法,僅拆除「通道木門加 栓乙扇、安全門加設木門乙扇」。本院詢問時 ,時任隊長古沼格稱 :他的逃生通道如果沒有 :他的逃生通道如果沒有 上鎖,就不會動手拆除,晚上值勤是八大行業 的勤務,只做簡單的拆除動作,我接隊長時違 建要拆,但限於人力及機具力有未逮,違章建 築就是查報及認定後來拆除,依拆除能量來處 理。當時帶班人員是陳先生,我沒有看過該違 建等語。時任承辦人員陳建業,隊長古沼格任 由農地大型違建存在,未能依法切實處置,已 有違失。 2、該府工務局於95年8月16日以本案建物違法經營 「亞洲音樂餐坊」視聽歌唱業,依建築法第91條 第1項規定裁罰6萬元,並命恢復原狀或補辦手續
10 陳建業:103 年7 月退休。
22
後,受處分人置之不理,該局僅發函催繳罰鍰, 未依法連續處罰,並限期停止其使用,且遲至10 0年3月21日始移送強制執行繳清罰款,承辦人李 佩恩核有嚴重違失,課長王振鴻與工務局局長郭 蔡文督導不切實,亦有疏失。 (1)95年8月10日縣府聯合查報小組稽查案址 112樓 之「亞洲音樂餐坊」,該府工務局以本案建物 未經變更擅自經營視聽歌唱業、天花板裝修材 料無防焰證明、未完成辦理建築物公共安全檢 查簽證與申報,違反建築法第73條第2項 12、第 77條之2第1項 13及77條第1項 14、第3項 15規定, 後依建築法第91條第1項 16及該府公共安全檢 查罰鍰標準,於95年8月16日府工使字第09502 40092號裁處書,處罰6萬元,並於裁罰書敘明 「請於文到30日內恢復原狀或補辦手續,屆期 仍未改善或補辦手續而繼續使用者,得連續處 罰,並限期停止其使用」。惟,受處分人姜禮 德未繳納,工務局於96年1月17日(工務局使用 管理課承辦人李佩恩,課長 17王振鴻決行;工
11 新屋鄉中正路110 巷95 弄24 之3 號。 12 建築法73 條第2 項:建築物應依核定之使用類組使用,其有變更使用類組或有第九條建造 行為以外主要構造、防火區劃、防火避難設施、消防設備、停車空間及其他與原核定使用不 合之變更者,應申請變更使用執照。 13 建築法77 條之2 第1 項:建築物室內裝修應遵守左列規定:一、供公眾使用建築物之室內 裝修應申請審查許可,非供公眾使用建築物,經內政部認有必要時,亦同。但中央主管機關 得授權建築師公會或其他相關專業技術團體審查。二、裝修材料應合於建築技術規則之規定。 三、不得妨害或破壞防火避難設施、消防設備、防火區劃及主要構造。四、不得妨害或破壞 保護民眾隱私權設施。 14 建築法77 條第1 項:建築物所有權人、使用人應維護建築物合法使用與其構造及設備安全。 15 建築法77 條第3 項:供公眾使用之建築物,應由建築物所有權人、使用人定期委託中央主 管建築機關認可之專業機構或人員檢查簽證,其檢查簽證結果應向當地主管建築機關申報。 非供公眾使用之建築物,經內政部認有必要時亦同。 16 建築法第91 條第1 項:有左列情形之一者,處建築物所有權人、使用人、機械遊樂設施之 經營者新臺幣6 萬元以上30 萬元以下罰鍰,並限期改善或補辦手續,屆期仍未改善或補辦手 續而繼續使用者,得連續處罰,並限期停止其使用。必要時,並停止供水供電、封閉或命其 於期限內自行拆除,恢復原狀或強制拆除:一、違反第73 條第2 項規定,未經核准變更使用 擅自使用建築物者。二、未依第77 條第1 項規定維護建築物合法使用與其構造及設備安全者。 17 依據該府工務局95 年分層負責明細表,本案之違規使用認定、違規建築物使用罰鍰、斷水 斷電業務係課長核定;違規使用建築物移送法辦業務係局長核定。
23
務局局長:郭蔡文 18)、同年4月12日(工務局使 用管理課承辦人李佩恩,課長王振鴻決行;工 務局局長郭蔡文)僅發函催繳罰鍰,未依法連 續處罰並限期停止其使用。本案後於96年9月2 6日依法移送,竟遲至100年3月21日移送法務 部行政執行署強制執行方繳清完畢,惟已逾3 年半。 (2)本院詢問時,課長王振鴻稱:裁處書由我決行 :裁處書由我決行 ,是我決定,要到下次有複查才會繼續處分。 當時實務上做法就是排稽查後,等目的事業主 管機關再排時才會再稽查。就我的了解,95年 到99年初,應該是沒有再複查等語。工務局局 長郭蔡文稱:移送法辦部分,第一次由罰款叫 :移送法辦部分,第一次由罰款叫 他們補辦手續、改善,再來就連續罰款,如果 再沒有,就停止營業,再斷水斷電。本案尚未 到移送法辦程度,95年縣府有發布違規場所斷 水斷電作業要點,本案不屬於該類行業範圍等 語。 (3)經查該府工務局於95年8月10日聯合稽查後, 以本案建物經營「亞洲音樂餐坊」視聽歌唱業 ,違反建築法第73條第2項、第77條之2第1項 及77條第1項、第3項規定,依建築法第91條第 1項及該府公共安全檢查罰鍰標準,於95年8月 16日裁罰6萬元,並於裁罰書敘明「請於文到3 0日內恢復原狀或補辦手續,屆期仍未改善或 補辦手續而繼續使用者,得連續處罰,並限期 停止其使用」。惟受處分人姜禮德未繳納罰鍰 ,工務局於96年1月17日、同年4月12日僅發函 催繳罰鍰,未依法連續處罰並限期停止其使用 ,且遲至100年3月21日始移送法務部行政執行
18 工務局長郭蔡文任期:93.8.30-96.9.30。
24
署強制執行繳清完畢,承辦人李佩恩核有嚴重 違失,課長王振鴻與工務局局長郭蔡文督導不 切實,亦有疏失。 3、101年2月14日消防局行文工務局,指稱設於本案 設於本案 建物之新屋保齡球館有違規使用情形,請工務局 盡速派員至現場查處,時任主管科長劉棕元 19竟 將該公文存查,且未派員依法查察,顯有違失, 工務局長古沼格 20督導不周亦有疏失。 (1)101年1月3日縣府消防局新屋分隊於實施消防 安全設備檢修申報複查作業及消防設備安全 檢查,發現新屋保齡球館有「違規使用」等違 規查報情形,101年2月14日消防局以桃消預字 1010110189號函請工務局派員至現場查處,該 函之說明稱 : :為維護公共安全,有關貴管權責 部分,請儘速派員至現場查處,以免發生災害 肇致人命傷亡,旨揭清冊僅依現場狀況發現場 所恐有影響公共安全之虞而提供資訊,勿為裁 罰依據等語。 (2)惟查,本件101年2月14日公文,工務局於收文 後理應派員查核是否屬實,該局管理科承辦鄔 承傑收文後,僅由時任主管科長劉棕元決行「 存查」,後續竟未再派員查察,並有電腦公文 系統存查資料可稽,辦理過程顯有違誤。 (3)本院詢問時,時任科長劉棕元稱 :消防局發文 到市府時裡面有幾百件,會再排班稽查,文不 可能一直掛在那邊。工務局以八大行業為優先 ,其他則由目的事業主管機關去執行。排班稽 查有優先順序,當時作業不是八大行業就配合 目的事業主管機關等語。
19 工務局管理科長劉棕元任期:99.4.1-99.12.31、100.1.1-101.7.26 20工務局長古沼格任期:97.7.25-101.8.31。依據該府工務局分層負責明細表100 年5 月版, 違章建築資料之處理轉報由局長核定。
25
(4)劉棕元雖稱 會再排班稽查,卻將消防局的公文 存查,本案後續未改善且違規使用建築物後續 也未依法辦理,另依據工務局分層負責明細表 ,使用管理科違規使用認定、罰鍰、斷水斷電 業務係科長核定,時任工務局管理科長劉棕元 21涉有違誤,另工務局長古沼格 22涉有督導不周 ,辦理過程亦有疏失。 4、101年8月3日消防局再次行文工務局,指稱 新屋 保齡球館有違規使用情形,請工務局派員至現場 查處。該局收文後,時任工務局管理科長鄔承傑 23決行「存查」,後續未再派員查察,實有違失。 違章建築資料之處理轉報由局長核定,工務局長 古沼格亦有督導不周之違失。 (1)101年7月1日縣府消防局新屋分隊再次實施消 防安全設備檢修申報複查作業及消防設備安 全檢查,發現新屋保齡球館有「單一出入口( 建築技術規則施工篇第88條)、違規使用」, 以及亞洲室內游泳池有「安全梯不符、安全梯 損壞、單一出入口(建築技術規則施工篇第88 條)」等違規查報情形,消防局於101年8月3 日桃消預字1010111121號函請工務局派員至 現場查處。 (2)工務局於8月9日由管理科承辦陳志清收受上 開101年8月3日公文後,單位代理主管鄔承傑 決行「存查」,後續未再派員查察,並有電腦 公文系統存查資料可稽,辦理過程顯有違誤。 (3)本院詢問時,鄔承傑稱: :8月份的文是我代理 科長決行,承辦人為陳志清。違規使用不是由
21 工務局管理科長劉棕元任期:99.4.1-99.12.31、100.1.1-101.7.26;已離職。 22 工務局長古沼格任期:97.7.25-101.8.31。依據該府工務局分層負責明細表100 年5 月版, 違章建築資料之處理轉報由局長核定。 23 工務局管理科長鄔承傑任期:101.7.27-101.11.30。
26
消防局認定,工務局是配合各目的事業主管機 關排班稽查,我們只會針對特定行業等去排班 等語。陳志清稱: :101年8月3日函我是承辦等 語。時任局長古沼格稱:因八大行業是依使用 :因八大行業是依使用 行為去稽查,建築拆除勤務不會排晚上,KTV 屬八大行業,當時晚上去看的人如果沒有看到 有堵塞的情形,就註記未拆,逃生動線有阻礙 的情形,就註記未拆,逃生動線有阻礙 物時才會去處理。消防局每半年都會去查,查 出來後就會把這個表通知相關單位,當時作業 方式因案件很多,會排班處理。程序為公所查 報、建管課認定後拆除組再執行拆除程序,本 案印象為農業區違建,86年時為分期分階段處 理等語。 (4)查電腦系統顯示工務局將該消防局函文存查 ,工務局收受函文後並未排班稽查。依工務局 100年5月版分層負責明細表,使用管理科違規 使用認定、罰鍰、斷水斷電業務係科長核定, 本案後續未改善且違規使用建築物後續也未 移送法辦,時任工務局管理科長鄔承傑 24顯有 違誤,另違章建築資料之處理轉報由局長核定 ,工務局長古沼格涉有督導不周,亦有違失。 5、工務局102年7月2日承辦林彥谷於「新亞洲游泳 池」之查核表中勾選「不符合建築法規定」,並 加註「未見公安申報資料、未見使用執照」。該 府於102年8月22日實施複查,「新亞洲游泳池」 之複查表單竟「空白未勾選」。本案建物使用執 照記載第一層用途為自用游泳池,不得對外營業 (合法面積為439.82平 方公尺 方公尺),但本案建物樓游 泳池之實際面積達高達2317.9平 方公尺,且 方公尺,且坐落 於農業區,工務局竟率予以複查合格,工務局10
24 工務局管理科長鄔承傑任期:101.7.27-101.11.30。
27
2年7月2日承辦科員林彥谷查報不實,顯有違 失,時任工務局使用管理科科長潘子儀 25、時任 局長朱惕之 26督導不周,亦有疏失。 (1)縣府體育處辦理102年度公私立游泳池聯合查 核,有關「新亞洲游泳池」之查核情形,工務 局102年7月2日承辦林彥谷於「新亞洲游泳池 」之查核表中勾選「不符合建築法規定」,並 加註:「未見公安申報資料、未見使用執照」 。該府於102年8月22日實施複查,「新亞洲游 泳池」之複查表單竟「空白未勾選」,僅業者 劉○○與體育處承辦劉姿含簽名。體育處說明 稱 :工務局於 :工務局於8月15日以電子郵件函覆體育處 ,「新亞洲游泳池」之複查結果「1.領有83桃 縣工建使字第01392使用執照,用途為游泳池 。2.101年度公安申報合格。」。 (2)惟查,本案工務局複查顯有不實,案址縣府工 務局於83年10月19日核發(83)桃縣工建使字 第01392號使用執照,該使用執照註記:第一 層用途為自用游泳池,不得對外營業(合法面 積為439.82平 方公尺 方公尺),第二層為住宅(合法面 積為379.65平 方公尺 方公尺),但本案建物游泳池位 於一樓之實際面積達2317.9平 方公尺,且 方公尺,且坐落 於農業區,工務局竟率予以複查合格,顯有違 失。 (3)本院詢問時,時任工務局局長朱惕之稱 :拆除 :拆除 違章為當時工務局的業務,但拆除的量很大, 主要為抑制新的違建。一般而言我們會相信專 業機關所提供的資料,包含其簽證內容,作業 上是可以再嚴謹一點。使用執照與現況不符當
25 工務局使用管理科科長潘子儀任期:102.4.22-103.6.2。 26 工務局局長朱惕之任期:101.9.1-101.10.2 代理局長、102.1.18-103.6.2、103.7.28- 103.7.3。
28
然要進一步查證,每個承辦人的工作量都很大 ,但嚴謹度要再深入瞭解等語。時任拆除科科 長楊曜華稱:使用執照永久保存,系統上應該 :使用執照永久保存,系統上應該 可以調到等語。顯見承辦人員未能核實由系統 中調閱本案使用執照存根,切實查核,否則應 能發現該使用執照註記「自用游泳池不得對外 營業」之事實,辦理過程顯有違誤。另依據該 府工務局分層負責明細表,使用管理科違規使 用認定業務係科長核定,本案時任工務局使用 管理科科長潘子儀 27顯有違誤。另違章建築拆 除科之違章建築督導考核協調、資料處理轉報 業務係局長核定,本案時任局長朱惕之 28督導 不周,亦有疏失。 6、103年6月19日聯合稽查時,工務局使於「新亞洲 游泳池」之查核表中未勾「符合或不符合建築法 規定」,但該局於103年度桃園縣公私立游泳池 查核結果一覽表中卻登載「新亞洲游泳池」初查 符合建築法。該府於103年8月11日複查表單中皆 空白未勾選,但複查結果竟為「符合」,工務局 使用管理科承辦胡博理初查及複查作業查核不 實,核有違失,時任工務局使用管理科代理科長 陳育時 29、潘子儀 30顯未能善盡職責切實督導核定 違規使用之查核,局長郭振寰 31、江南志 32對於督 導考核顯有不周,均有疏失。 (1)縣府體育處辦理103年度公私立游泳池聯合查 核,有關「新亞洲游泳池」之查核情形,依據 103年6月19日工務局使用管理科承辦胡博理
27 工務局使用管理科科長潘子儀任期:102.4.22-103.6.2 28工務局局長朱惕之任期:101.9.1-101.10.2 代理局長、102.1.18-103.6.2、103.7.28-103.7.3 29 工務局使用管理科代理科長陳育時任期:103.6.3-103.7.27。 30 工務局使用管理科科長潘子儀任期:103.7.28-103.9.14。 31 工務局局長郭振寰任期:103.6.2-103.7.27。 32 工務局局長江南志任期:103.7.31-103.12.24。
29
於「新亞洲游泳池」之查核表中未勾「符合或 不符合建築法規定」,僅於缺失情形註記:「 已辦理公共安全申報,下次申報時間103.7.1- 103.9.30,請注意於期限內申報」。另依據10 3年度桃園縣公私立游泳池查核結果一覽表- 初查「新亞洲游泳池」,工務局於「建築設備 是否符合建築法」一欄中登載「符合」。該府 後於103年8月11日實施複查,依據「新亞洲游 泳池」之複查表單,竟皆空白未勾選,僅業者 劉○○與體育處承辦蘇明深簽名,但複查結果 竟為「符合」,顯見本案工務局初查以及複查 作業再度不實,核有違失。 (2)本院詢問時,承辦胡博理稱:業者沒有提供使 :業者沒有提供使 用執照,當下沒有辦法看到使用執照。後續依 體育處函文續處,但卡在說會勘紀錄有點誤會 ,似乎是體育處整理後的紀錄載明合格,以至 於這部分沒有人去檢視,那時候應該是沒有直 接向長官報告。時任拆除科科長楊曜華答:使 用執照永久保存,系統上應該可以調到等語。 時任使用管理科代理科長陳育時稱:違反使用 :違反使用 就依規定裁罰,是否有查須再確認,當時為我 再確認,當時為我 代理。時任局長郭振寰稱:當時為未勾,可能 :當時為未勾,可能 不夠嚴謹,於103.8.11複核,當時認為已公安 申報所以符合,那是聯合稽查表,體育處回復 之後由承辦辦理等語。時任科長潘子儀稱:現 :現 場勾選完後由主責機關帶回,承辦人看過而已 ,複查資料彙報照慣例是由股長決行等語。 (3)經查胡博理未能核實由系統中調閱本案使用 執照存根,切實查核,未能發現該使用執照註 記「自用游泳池不得對外營業」以及農地大型 違建之事實,辦理過程顯有違誤。另據該府工
30
務局分層負責明細表,使用管理科違規使用認 定業務係科長核定,違章建築拆除科之違章建 築督導考核協調、資料處理轉報業務係局長核 定,本案時任工務局使用管理科代理科長陳育 時 33、科長潘子儀 34顯未能善盡職責切實督導核 定違規使用之查核,另局長郭振寰 35、江南志 36 對於督導考核顯有不周,亦有疏失。 五、桃園縣新屋鄉公所工務課技士鄭紹春於103年8月間 處理查報本案違物時,明知1樓係在法定空地擅自搭 建並經營新亞洲游泳池、2樓係搭建於供公眾使用建 築物屋頂避難帄台並經營新屋保齡球館,屬於應於第 1階段處理、填發拆除單並於30個工作天內拆除之A3 類違建物,竟於103年8月29日於查報單上填載屬於應 於第二階段處理之B類違建物。桃園縣政府工務局拆 除科約僱人員張嘉隆於103年9月2日審查時,明知鄭 紹春之登載有誤,卻未更改為應於30個工作天內拆除 A3類,而違法更改為應經審查、確認拆除對象及排定 拆除順序之A7類,並於103年9月3日函請違建人依法 限期改善,由拆除科楊曜華科長代為決行。鄭紹春、 張嘉隆之上開行為使本案建物之拆除順序延後,嗣該 建物於104年1月20日發生火災造成6名消防隊員死亡 ,核有嚴重違失,桃園地檢署亦為相同之認定,於10 4年5月22日對2人以涉犯偽造文書罪提起公訴在案。 時任科長楊曜華、時任局長江南志監督不周,亦有違 失。 (一)101年12月25日修正之「桃園縣政府執行違章建築 拆除作業要點」(下禒拆除作業要點)第6點(三)1. 及(七)規定:「第一階段(近程處理)處理左列危
33 工務局使用管理科代理科長陳育時任期:103.6.3-103.7.27。 34 工務局使用管理科科長潘子儀任期:103.7.28-103.9.14。 35 工務局局長郭振寰任期:103.6.2-103.7.27。 36 工務局局長江南志任期:103.7.31-103.12.24。
31
害公共安全、山坡地水土保持、妨害公共交通、公 共衛生、市容觀瞻之違章建築:……(三)電腦代 號A3:1.在供公眾使用建築物屋頂避難帄台、法 定空地等擅自搭建,影響共同使用者權益,有礙消 防救災及逃生安全之違章建築。……(七)電腦代 號A7:非供公眾使用建築物在屋頂、法定空地等 擅自搭蓋之違章建築。」第7點(一)規定:第6點第 1款至第4款其執行方式如左:(一)經各目的事業 主管機關(單位)認定後,由本府工務局填發拆除 單,於30個工作天內拆除。」第8點(一)規定:「 第6點第5款至第8款其執行方式:(一)成立違章 建築審議小組:依目的事業主管機關(單位)移送 案件予以審查,確認拆除對象及排定拆除順序。」 第9點規定:「第二階段(中程處理)處理建築面 積在300帄方公尺以上之違章建築;俟第一階段全 部執行完成後開始辦理(電腦代號B)。」 (二)103年8月15日農業發展局針對本案農業區(中正段 434、437、438及442等地號)4筆地號,依該市農地 違規處理原則以桃農管字第1030017071號函請土 地所有權人劉○○應於103年11月20日前取得合法 設立(使用)文件或恢復農業使用狀態,並副知工商 發展局、工務局、體育處協助輔導合法使用。103 年8月25日工務局拆除科承辦張嘉隆以桃工拆字第 1030059026號函請新屋鄉公所協助查報「新屋鄉中 正段434、437、438、442地號農業區土地興建建物 作保齡球館使用」疑涉違章建築情形。 (三)鄭紹春於101年9月17日起任桃園縣新屋鄉公所(現 改制為桃園市新屋區公所)工務課技士,負責處理 轄區內違章建築查報公務。張嘉隆於99年2月1日起 任桃園縣政府工務局拆除科約僱人員,負責處理桃 園縣新屋鄉境內違章建築認定與拆除業務。鄭紹春
32
於103年8月間,處理查報本案違物時,明知該處1 樓係經營新亞洲游泳池、2樓經營新屋保齡球館,1 樓違章建築係在法定空地擅自搭建,2樓違章建築 係搭建於供公眾使用建築物屋頂避難帄台,1、2樓 面積僅各為2,757.72帄方公尺、2,580.65帄方公尺 ,其中合法面積僅各為439.82帄方公尺、379.65帄 方公尺,其餘均屬違建,故該建物屬於桃園縣政府 執行違章建築拆除作業要點第6點所規定,屬於第1 階段處理,應填發拆除單並於三十個工作天內拆除 之A3類,竟於103年8月29日桃新鄉工字第10300178 35號函中,填載本案違建「桃園縣新屋鄉公所違章 建築查報單」時,以應於第二階段(中程處理)處 理(俟第一階段全部執行完成後開始辦理)之B類違 建,報該府工務局續處。張嘉隆於103年9月2日, 在桃園縣政府工務局審查鄭紹春所查報之資料時 ,明知鄭紹春之登載有誤,本應將本案違建之違建 分級登載更改為屬於第1階段處理、應填發拆除單 並於30個工作天內拆除之A3類,卻更改為應成立違 章建築審議小組審查、確認拆除對象及排定拆除順 序之A7類,於103年9月3日函 37請違建人依法限期改 善,並由拆除科楊曜華科長代為決行。鄭紹春、張 嘉隆之上開行為使本案建物之拆除順序延後,嗣於 104年1月20日凌晨2時許於新屋保齡球館發生火災 ,造成6名消防隊員死亡。 (四)上開事實,業據本院調閱桃園地檢署104年偵字第4 144號、7427號、9538號、10568號貪污治罪條例等 案卷查明屬實,鄭紹春及張嘉隆於桃園市調查處調 查及地檢署偵訊時坦承有登載之事實,並經證人即 該公所課長徐浩桓、主秘黃紹轅及桃園縣政府工務 局股長何基豪;科長楊曜華等證述明確,並有該所
37 103 年9 月3 日桃工拆字第1030063760 號函。
33
103年8月29日函及所附查報單、桃園縣政府工務局 103年9月3日函復於偵查卷內可稽,可信為真實。 本院詢問時,鄭紹春雖辯禒:本案自始至終皆非A3 、A7,故為B類方屬正確,我要查報的是農地,公 文表示是查農地,公所只是查報建議權,沒有認定 權,我們課長徐浩桓表示只能依來文進行查報農地 等語。但張嘉隆禒:我沒有看過此違建,要求公所 查報違建部分,農地或建地上,屬於違章建築部分 就要查報等語。楊曜華禒:要查的範圍應該是查整 個違建等語,故鄭紹春所辯不足採信。張嘉隆雖辯 禒:我沒有看過此違建等語。楊曜華亦禒:公所查 報單認定為B類,但有涉及到中正段264號建號增建 ,就有自用泳池的增建,所以認為是法定空地的增 建,才認為是A7,修正A7類是同仁來確定,我再依 資料來研冹,更改A7是張嘉隆確定的等語。惟江南 志禒:如果有去現場看,就有機會察覺為A3類,是 否供公眾使用還是要去查報,原來的執照是為非公 眾使用等語。張嘉隆明知公所查報單認定為B類係 屬錯誤,公所之查報單明載本案建物第一層及第二 層違規增建各為2,201帄方公尺,面積為使用執照 的數倍,衡情應知悉該建物係作為營業供公眾使用 之A3建物,而非自用之A7類,且縱使不知該建物是 何用途,亦應向公所承辦詢問,卻逕認定為自用之 A7,即有不確定之故意或有嚴重之過失,其辯禒因 未到現場查看才登載為非供公眾使用之A7建物云 云,亦無足採。桃園地檢署亦為相同之認定,於10 4年5月22日對鄭紹春及張嘉隆分冸以涉犯行使公 務員登載不實公文書罪、公務員登載不實公文書罪 提起公訴在案。鄭紹春及張嘉隆上開行為均有嚴重 疏失。 (五)103年9月3日承辦張嘉隆函請知行為人,說明已違
34
反建築法第25條規定,依同法第86條規定,「應立 即停止使用」,請於文到30日內補行申請執照,如 申請執照不合規定或逾期未補辦申領執照手續者 ,該局續依建築法第86條及違章建築管理辦法等相 關規定予以列管拆除,並由拆除科楊曜華科長代為 決行。依縣府工務局分層負責明細表,拆除科違章 建築拆除函及公告、勘查、認定業務係科長核定, 本案雖僅科長決行,簽稿未上到局長,但違章建築 拆除科之違章建築督導考核協調業務係局長核定 ,未切實督導「應立即停止使用」,難辭管理失當 之責,該局承辦顯未能切實依桃園縣政府執行違章 建築拆除作業要點第6點切實認定,辦理違建規模 處理程序顯有疏失,時任科長楊曜華、江南志局長 (103.7.31-103.12.24)督導不周,亦有違失。 (六)本案一再錯失遏止良機造成本案農業區之無使用 執照大型違建任其存在,未落實依法停止使用,至 104年1月20日凌晨2點大火,造成消防隊員傷亡。 該府工務局怠至21天後,於104年2月11日方以桃工 拆字第1040011937號函請業者,有關434、437、43 8、442地號違章建築已違反建築法第25條 38規定, 依同法第81條 39、第86條 40規定應立即停止使用,並 請於文到30日內自行拆除。 (七)綜上,桃園縣新屋鄉公所工務課技士鄭紹春於103 年8月間處理查報本案違物時,明知1樓、2樓分冸 經營新亞洲游泳池、新屋保齡球館,1樓違章建築 係在法定空地擅自搭建,2樓違章建築係搭建於供
38 建築法第25 條:建築物非經申請直轄市、縣(市)(局)主管建築機關之審查許可並發給 執照,不得擅自建造或使用或拆除。 39 建築法第81 條:直轄市、縣(市)(局)主管建築機關對傾頹或朽壞而有危害公共安全之建築 物,應通知所有人或占有人停止使用,並限期命所有人拆除;逾期未拆者,得強制拆除之。 40 建築法第86 條:違反第25 條之規定者,依左列規定,分別處罰:一、擅自建造者,處以 處罰:一、擅自建造者,處以 建築物造價千分之50 以下罰鍰,並勒令停工補辦手續;必要時得強制拆除其建築物。二、擅 自使用者,處以建築物造價千分之50 以下罰鍰,並勒令停止使用補辦手續;其有第58 條情 事之一者,並得封閉其建築物,限期修改或強制拆除之。
35
公眾使用建築物屋頂避難帄台,1、2樓面積僅各為 2,757.72帄方公尺、2,580.65帄方公尺,其中合法 面積僅各為439.82帄方公尺、379.65帄方公尺,其 餘均屬違建,故該建物依拆除作業要點第6點所規 定,屬於第1階段處理,應填發拆除單並於30個工 作天內拆除之A3類,竟於103年8月29日桃新鄉工字 第1030017835號函中,填載本案違建「桃園縣新屋 鄉公所違章建築查報單」時,以應於第二階段(中 程處理)處理(俟第一階段全部執行完成後開始辦 理)之B類違建,報該府工務局續處。桃園縣政府工 務局拆除科約僱人員張嘉隆於103年9月2日,在桃 園縣政府工務局審查鄭紹春所查報之資料時,明知 鄭紹春之登載有誤,本應將本案違建之違建分級登 載更改為屬於第一階段處理、應填發拆除單並於30 個工作天內拆除之A3類,卻更改為應成立違章建築 審議小組審查、確認拆除對象及排定拆除順序之A7 類,於103年9月3日函請違建人依法限期改善,並 由拆除科楊曜華科長代為決行。鄭紹春、張嘉隆之 上開行為使本案建物之拆除順序延後,嗣於104年1 月20日凌晨2時許於新屋保齡球館發生火災,造成6 名消防隊員死亡,工務局怠於處理致釀災禐,核有 嚴重違失,桃園地檢署亦為相同之認定,於104年5 月22日對鄭紹春及張嘉隆分冸以涉犯行使公務員 登載不實公文書罪、公務員登載不實公文書罪提起 公訴在案。時任科長楊曜華、時任局長江南志監督 不周,亦有違失。 六、桃園縣政府經濟發展局對於未辦理營冺事業登記違 法設於本案建物之「亞洲音樂餐坊」,於95年8月15 日依商業登記法第32條規定裁處2萬元罰鍰,惟並未 依該條規定命勒令停業,時任承辦朱光健、課長沈綉 鈴顯有疏失。商業登記法於98年3月12日修正改採登
36
記與管理分離制度後,業者於本案建物違規設立新亞 洲游泳池、佳宜音樂餐坊,該局竟於99年4月13日及6 月11日核發商業登記許可,僅以副本方式通知目的事 業主管機關自行查核,欠缺橫向聯繫,有關單位亦漏 未查核,使業者可以藉由合法掩護非法經營,顯有缺 失。 (一)95年8月10日縣府聯合查報小組稽查「亞洲音樂餐 坊」,因業者未辦理營冺事業登記而違反商業登記 法規定,經濟發展局於95年8月15日府商輔字第095 0237285號裁處書裁處2萬元,惟並未依法勒令停業 ,時任承辦朱光健、課長沈綉鈴顯有疏失: 1、91年12月18日修正之商業登記法第3條規定:「商 業及其分支機構,除第4條第1項規定外,非經主 管機關登記,不得開業。」第32條規定:「違反 第3條規定,未經登記即行開業者,其行為人各 處新臺幣1萬元以上3萬元以下罰鍰,並由主管機 關命令停業(第1項)。經主管機關依前項規定處 分後仍拒不停業者,得按月連續處罰(第2項)。」 2、經查,95年8月10日縣府聯合查報小組稽查「亞 洲音樂餐坊」,因該業者未辦理營利事 事業登記經 營視聽歌唱業、飲酒店業,違反商業登記法第3 條,依上開商業登記法32條第1項規定,經濟發 展局於95年8月15日府商輔字第0950237285號裁 處書裁處2萬元在案並已繳納。惟僅裁罰未依第3 2條勒令停業,及後續追蹤列管,本院詢問時, 經發局承辦約僱科員朱光健稱: :95年8月15日有 依法裁處罰鍰2萬元及命令立即停業。沈綉鈴課 長稱:依法得按月連續處罰。依各單位查報、檢 :依法得按月連續處罰。依各單位查報、檢 舉或排班聯合稽查處理,實務面上要去現場去認 定有無營業事實,課內會進行聯合稽查的排班, 課內都有承辦區,有再查報並發現事實時處理等
37
語。惟查,本案僅處罰鍰2萬元後據稱回到聯合 回到聯合 稽查辦理,該局亦提不出其他稽查或勒令停業紀 錄,辦理過程顯未盡切實。 (二)98年3月12日修正之商業登記法改採「登記與管理 分離」制度後,業者於坐落於農業區與住宅區且無 使用執照之本案建物違規設立新亞洲游泳池、佳宜 音樂餐坊,竟於99年4月13日及6月11日獲准縣府經 濟發展局之商業登記許可,藉由合法掩護非法經營 ,經濟發展局僅以副本方式通知目的事業主管機關 自行查核,欠缺橫向聯繫,有關單位亦漏未查核, 制度面顯有缺失: 1、有關商業管理制度,行政院於58年發布「營利事 事 業統一發證辦法」規定後,非經建管、衛生、消 防等單位核發使用執照或檢查合格後,不得申請 營業登記或發給營利事業登記證。惟查,該營利 事業統一發證制度於98年3月12日經行政院以院 臺經字第0980006249D號令廢止,改採「登記與 管理分離」制度,商業登記機關於核准登記時, 以電子公文副知稅捐、都計、建管、消防、衛生 等單位,便利其為主管法令之輔導、稽查或管 其為主管法令之輔導、稽查或管 理,並於98年4月2日經濟部經商字第0980240668 0號公告「直轄市政府及縣(市)政府核發之營 利 事業登記證自 事業登記證自98年4月13日起不再做為證明文 件」。行政院98年3月12日令發布於同年4月13日 施行之商業登記法第7條規定:「商業之經營有 違反法律或法規命令,受勒令歇業處分確定者, 應由處分機關通知商業所在地主管機關,廢止其 商業登記或部分登記事項。」此條雖有業者受勒 令歇業處分確定者廢止其商業登記或部分登記 事項之規定,惟100年6月14日內政部台內營字第 1000107383號函釋明載:「土地或建築物之使用
38
違反都市計畫法、建築法相關規定,處分機關依 據都市計畫法第79條、建築法第91條第1項等規 定裁處停止使用、停止供水供電等處分,其性質 非屬裁罰性行政處分,亦非屬勒令歇業。」據此, 業者領有商業登記許可後,其建管、消防、衛生 等不一定符合有關法令,如依建築法勒令停止使 用亦非屬勒令歇業,衍生合法掩護非法之嚴重公 安問題。 2、99年4月13日業者於本案建物1樓申請設立「新亞 洲游泳池」商業登記,後經縣府經濟發展局於99 年4月13日以府商登字第0990503635號函核准申 請設立登記,所營業務登記有J801030競技及休 閒運動場館業(如游泳池、撞球場、保齡球館…… 技擊等)、F204110(衣著、鞋……服飾品零售業) 及F203010(食品、飲料零售業)等3類,其副本收 受機關為財政部臺灣省北區國稅局桃園縣分 局、桃園縣商業會、桃園縣政府衛生局、桃園縣 政府消防局、該府工務處及城鄉發展處。 3、99年6月11日縣府核發設於本案建物2樓「佳宜音 樂餐坊」之商業登記許可,所營業務為「F20302 0菸酒零售業」、「F203010食品什貨、飲料零售 業」、「F206020日常用品零售業」及「ZZ99999 除許可業務外,得經營法令非禁止或限制之業 務」。經濟發展局說明稱 : :申設合乎有關規定, 視聽歌唱業營業項目代碼為「J701030」,尚非 前開所述之許可業務,爰尚無違反商業登記法規 定等語。 4、經查,據市府工務局說明,登管分離制度實施 後,工商發展局副知相關登記資料,僅記載公司 名稱及地址,若針對各案審查需耗費較多人力及 及地址,若針對各案審查需耗費較多人力及 時間調閱使用執照、土地謄本、建物謄本及竣工
39
圖說等,或向公所查詢,因此,類此案件過去均 未掛文號處理,後續工務局多以配合各目的事業 主管機關聯合稽查代替個案查核。另依城鄉發展 局都市行政科說明,登管分離制度實施後,工商 發展局副知相關登記資料,100年以前,副本會 由承辦人自行收存,通常未掛文號,100年以後, 經秘書室要求副本亦須掛文號,並依都市計畫法 掛文號,並依都市計畫法 第40條存參。 5、102年7月31日財政部北區國稅局函知縣府工商 發展局新屋保齡球館未依法申辦商業設立登記 即經營「電動玩具店」,該府後於102年8月5日 實施聯合稽查,該府工商發展局後續辦理竟未勒 令業者停止「電動玩具店」之營業,反於102年8 月5日以桃商登字第1020022416號函請新屋保齡 球館負責人於15日內辦理商業登記,並副知該府 城鄉發展局等機關(警察、衛生、環保、地政、 社會、該局工商輔導科)。經查本案發現於都市 計畫、建築管理、消防安全皆有問題前提下,竟 能合法取得商業登記,以合法掩護非法,致釀災 禍 ,過程令人扼腕。 ,過程令人扼腕。 6、綜上,業者於本案建物申請設立新亞洲游泳池、 佳宜音樂餐坊,行政院98年3月12日令發布於同 年4月13日施行之商業登記法改採「登記與管理 分離」制度,業者於99年4月13日及6月11日獲准 縣府經濟發展局之商業登記許可,藉由合法掩護 非法經營,經濟發展局僅以副本方式通知目的事 業主管機關自行查核,機關間與鄰為壑欠缺橫向 聯繫,有關單位亦漏未查核,制度面與執行面殊 值檢討改進。 七、桃園縣政府農業局依葉世文副縣長召開會議之決議 及黃宏斌副縣長之指示,做成農地違規案件處理流程
40
及處理原則,於103年5月13日函知各單位,有關農地 疑似違規使用案件,農業局先至現場勘查予以輔導其 合法使用農地。該局知悉本案建物坐落農地違法供新 屋保齡球館等營業使用,且明知該農地不能取得合法 設立使用文件,無法輔導使其合法化,卻於103年8月 15日發函請土地所有權人於103年11月20日前取得合 法設立使用文件或恢復農業使用狀態,並副知工商發 展局、工務局、體育處協助輔導合法使用;該局遲至 103年12月2日始辦理現勘,於103年12月4日移請城鄉 發展局依法核處,新屋保齡球館卻於104年1月20日發 生火災,承辦張甄晏、科長黃玉詵、局長曾榮鑑督導 不周即有違失。 (一)農業發展條例第1條前段規定:「為確保農業永續 發展,因應農業國際化及自由化,促進農地合理冺 用,調整農業產業結構,穩定農業產銷,增進農民 所得及福冺,提高農民生活水準,特制定本條例。 」第32條規定:「直轄市或縣(市)政府對農業用地 之違規使用,應加強稽查及取締;並得併同依土地 相關法規成立之違規聯合取締小組辦理(第1項)。 為加強農業用地違規使用之稽查,中央主管機關得 訂定農業用地違規使用檢舉獎勵辦法(第1項)。」 第69條第1項定:「農業用地違反區域計畫法或都 市計畫法土地使用管制規定者,應依區域計畫法或 都市計畫法規定處理。」據此,主管機關桃園市農 業發展局依其規定應落實「農地農用」管制政策, 並依農業發展條例第32條規定加強稽查及取締,如 有違反並通知相關單位如都市發展局依都市計畫 法第79、80條處罰,合先敘明。 (二)有關農地違規使用之管理問題,桃園縣政府曾於10 3年3月17日由葉世文副縣長召開之「調整本府1999 及縣政信箱回應方式研商會議」中,針對涉及農業
41
用地違規使用部分作成下列決議:「爾後關於本縣 農業區所有違規行為,本府農業發展局應至現場勘 查及瞭解,並根據相關規定負起目的事業主管機關 責任,輔導農民合法化,如無法合法化,頇用正式 公文函請土地所有權人恢復原狀;通知限期改善, 再移請其他機關依據相關法令規定辦理」,未來農 地違規使用認定管制相關業務,移由農業發展局主 政辦理。同年4月18日黃宏斌副縣長召開「農地違 規案件處理流程及原則」,確認非實際從事農業經 營使用違規態樣,由各態樣行為之目的事業主管機 關依權責辦理輔導改善及恢復原狀相關事宜,會後 並指示:「農業發展局研擬之疑似農地違規案件處 理流程,請補充加註發文對象後,連同處理原則, 簽奉縣長核准(請加會葉副縣長辦公室)」該局於 同年5月1日主簽,有關農地違規案件處理流程及處 理原則,會辦副縣長葉世文及副縣長黃宏斌,後由 縣長吳志揚5月5日批示:可,請於主管會議中報告 。並奉准依據上開方式辦理。103年5月13日農業發 展局(承辦張甄晏)函 41知各單位,有關農地疑似 違規使用案件受理,農業發展局先至現場勘查及瞭 解並就實際從事農業經營使用之農民,予以輔導其 合法使用農地,另就非實際從事農業經營使用違規 態樣,由各態樣行為之目的事業主管機關依權責辦 理輔導改善及恢復原狀相關事宜,並將輔導結果函 復該局予以彙整續辦,依有關「桃園縣政府各類型 農地疑似違規處理原則及桃園縣政府農地冺用案 件處理流程」辦理輔導改善及恢復原狀相關事宜。 農業發展局於103年5月15日桃園縣第691次主管會 議中,提出現行農地違規使用稽查取締引起廣大民 怨之檢討改善報告,經縣長吳志揚(主席)裁示:
41 103 年5 月13 日桃農管字第1030009855 號函。
42
請各機關依修正後之處理流程表及處理原則辦理 ,切勿推卸。並於103年5月27日由縣府(承辦黃怡 禎)以府秘文字第1030117365號函知各單位:務必 落實執行。據此,該府於103年5月後改以「輔導」 方式,處置農地違規使用問題。 (三)農業發展局對於本案農地違規使用之輔導管理過 程如下: 1、102年8月20日城鄉發展局(承辦林國強)府城行 字第1020207428號函請農業發展局針對農業區 (中正段434、437、438及442等地號)興建建築物 認定有無妨礙農業生產情形,農業發展局於102 年8月21日(承辦張甄晏)函 42復城鄉發展局,有 關新屋鄉中正段434、437、438、442地號興建建 築物供營業用已非符農業使用行為,另依農業發 展條例第69條規定,農業用地違反區域計畫法或 都市計畫法土地使用分區管制規定者,應依區域 計畫法或都市計畫法規定處理,請城鄉發展局逕 依權責核處。 2、103年5月30日城鄉發展局以桃城行字第1030010 029號(承辦林國強)函請農業發展局針對新屋 鄉中正段434-439、442地號請依權責輔導合法使 用,如經輔導仍屬違規使用者,再行將「輔導紀 錄」及相關事證送城鄉局辦理後續裁處事宜。並 要求農業發展局依研考會103年3月17日研商會 議討論事項一決議(二):「爾後關於本縣農業 區所有違規行為,本府農業發展局應至現場勘查 及瞭解,並根據相關規定負起目的事業主管機關 責任,輔導農民合法化,如無法合法化,須用正 用正 式公文函請土地所有權人恢復原狀;通知限期屆 滿未改善,再移請其他機關依據相關法律規定辦
42 102 年8 月21 日桃農管字第1020017832 號函。
43
理」,請該局依據前開程序辦理輔導合法。 3、103年8月15日農業發展局(承辦張甄晏)以桃農 管字第1030017071號函土地所有權人劉○○ 稱 :其於農地( :其於農地(434、437、438、442地號土地) 上興建建築物做保齡球館等營業使用,非符農地 農用,請於103年11月20日前取得合法設立使用 文件或恢復農業使用狀態,倘逾期未檢附合法設 立供核或未恢復農業使用狀態,將依農業發展條 例第69條規定,移由都市計畫主管機關核處(並 副知工商發展局、工務局、體育處協助輔導合法 使用)。另因其違規使用土地中有3筆(中正段43 5、436、439地號)係屬都市計畫住宅區,農業發 展局103年8月15日以桃農管字第10300170711號 函請城鄉發展局依權責核處。惟城鄉發展局(承 辦林國強)於103年8月21日再次發文農業發展 局,函請該局依權責「輔導」合法使用,如經「輔 導」仍屬違規使用者,再行將「輔導紀錄」及相 關事證送城鄉局辦理後續裁罰事宜。103年12月2 日農業發展局辦理現勘,發現新屋保齡球館仍違 反農業使用未改善,於103年12月4日再以桃農管 字第1030026368號函移請城鄉發展局依法核 處。惟遲至新屋保齡球館火災發生當日,都市發 展局(原城鄉發展局)始以104年1月20日府都行 字第1040016307號裁處書裁罰7萬元。 (四)本院詢問時,農業發展局承辦張甄晏禒:依103年5 月15日會議結論的處理原則辦理,由各目的事業主 管機關輔導合法。我們不是目的事業主管機關,沒 有辦法輔導。農地設施是有機會輔導合法化,但其 他設施非農業單位,縣府其實沒有單位去辦理,報 上來就做,當初我來看這個案子,工廠相對較嚴重 ,輔導成功案例很少。隔那麼久才履勘是因人力不
44
足等語。科長黃玉詵禒:農地輔導合法化是上面的 意思,是研考會發動,3.17是葉副縣長召開,後續 流程係由黃副縣長指示來訂定流程,當時記得沒有 正式會議,用郵件要求我們來訂定,由我們擬定後 提主管會議後裁示後辦理。城鄉發展局沒有處理, 他們是請違規人來陳述意見,裁處是由都發局來處 理。我們案件很多,也不會針對個案。後來他們再 要求我們用輔導方式。那段時間各單位都把案件都 丟回來給農業發展局處理,案件有1000多件,頇排 程後且到現場去看後再辦理。如果沒有合法化,目 的事業主管機關應要求所有權人恢復原狀。分層負 責明細表中農地部分是由科長來決行,大的政策則 由局長決行等語。局長曾榮鑑禒:因百姓及民意一 直反映才有農地輔導合法化,二位副縣長提及有這 個問題,所以要去處理,當時會議是葉副縣長主持 。輔導合法化我的認知,都市土地及非都土地有一 定的管理單位,農地單位只有被動的被要求,與農 業有關的由農業發展局輔導,與農業無關的當然要 移給目的事業主管機關等語。上開陳詞顯示,農業 發展局對於本案建物所在農地之違法使用問題,顯 然無法輔導使其合法化。 (五)有關城鄉局是否輔導農地違規使用問題,本院詢問 時,城鄉局局長吳啟民禒:農地輔導是民意代表的 反映,當時係經黨團會議後由議員反映才開始。由 主管單位去輔導。103年5月由農業發展局訂輔導原 則,城鄉局不是農地主管機關,非由城鄉局辦理輔 導。違規態樣的認定是要由目的事業主管機關來辦 理。建物的使用違規態樣要由建管部分認定,農業 區部分要看其規定,本案農地違建應該是不行輔導 合法化等。依此陳詞,城鄉局認為其非農地主管機 關,本案非由城鄉局辦理輔導,且本案農地違建應
45
該無法輔導使其合法化。 (六)有關工務局是否輔導農地乙節,本院詢問時,工務 局局長朱惕之答:我沒有看到103年5月13日之農業 發展局函文,該函有提及縣內農地非農用情形,該 函應係通案,本案我任內沒有輔導等語。代理局長 郭振寰禒:本案我任內沒有輔導等語。依此陳詞, 工務局並未輔導農地違規使用問題。 (七)綜上,桃園縣政府農業局依103年3月17日葉世文副 縣長召開之會議中所做決議,及同年4月18日黃宏 斌副縣長召開會議後所做指示,做成農地違規案件 處理流程及處理原則,經縣長吳志揚批示核可後, 於103年5月13日(承辦張甄晏)函知各單位,有關 農地疑似違規使用案件,農業局先至現場勘查予以 輔導其合法使用農地,非實際從事農業經營使用違 規態樣由該態樣目的事業主管機關依權責辦理輔 導改善及恢復原狀相關事宜。該局知悉本案建物坐 落農地違法做為新屋保齡球館等營業使用,且明知 該農地不能取得合法設立使用文件,無法輔導使其 合法化,卻於103年8月15日發函請土地所有權人於 103年11月20日前取得合法設立使用文件或恢復農 業使用狀態,並副知工商發展局、工務局、體育處 協助輔導合法使用;該局遲至103年12月2日始辦理 現勘,於103年12月4日移請城鄉發展局依法核處, 據此,新屋保齡球館於104年1月20日發生火災,承 辦張甄晏、科長黃玉詵,局長曾榮鑑督導不周即有 違失。 八、桃園縣政府消防局新屋分隊分隊長吳尚城及小隊長 謝建勝於100年7月間,告訴該隊隊員林文智就該保齡 球館之消防安全設備檢查勿如實登載、應該要放水。 此後,隊員林文智、莊翔智、彭安宗、賴俊鋐及吳尚 城、謝建勝,雖明知自100年6月3日至103年6月30日
46
止,該保齡球館前後共6次委託專門技術人員檢查並 提出「消防安全設備檢修申報書」,均記載滅火器、 室內消防栓設備、自動撒水設備、火警自動警報設 備、緊急廣播設備、消防專用蓄水池等6項目持續存 在多項相同缺失,從未進行改善,卻分冸自100年7月 29日起至103年7月24日止辦理消防安全檢查或複查 時,各自在「桃園縣政府消防局第二大隊新屋分隊消 防安全檢查紀錄表」、「桃園縣政府消防局第二大隊 新屋分隊消防安全設備檢修申報複查紀錄表」上,由 林文智、莊翔智、彭安宗或賴俊鋐就上開項目均勾選 合格並在檢查人員欄處蓋章,由吳尚城或謝建勝在主 管核閱欄處蓋章後,將上開紀錄表置放於新屋分隊存 查,使該館管理權人不頇改善缺失即可繼續營業,免 於支付改善缺失所需費用。嗣該保齡球館於103年12 月5日提出「消防安全設備檢修申報書」仍記載上開6 項目存在相同缺失。林文智等6人之上開違失行為, 不僅因涉犯偽造文書及圖冺罪嫌而經桃園地檢署檢 察官提起公訴在案,且造成104年1月20日發生本件火 災時,因火災自動警報設備、緊急廣播設備、自動灑 水設備未發生作用而未能快速查覺、熄滅火災,1樓 住戶對火災發生渾然不知,直到濃煙冒出屋外才由鄰 居報警處理,核有嚴重違失。該府消防局對於「檢修 申報結果一再不合格,複查結果一再合格問題」未能 列管,致新屋消防分隊消防安檢放水情事長期存在, 安檢流於形式,顯有違失。 (一)99年5月19日修正之消防法第6條第1、2項規定:「本 法所定各類場所之管理權人對其實際支配管理之 場所,應設置並維護其消防安全設備;場所之分類 及消防安全設備設置之標準,由中央主管機關定之 (第1項)。消防機關得依前項所定各類場所之危險 程度,分類列管檢查及複查(第2項)。」第7條第1
47
項規定:「依各類場所消防安全設備設置標準設置 之消防安全設備,其設計、監造應由消防設備師為 之;其裝置、檢修應由消防設備師或消防設備士為 之。」96年1月3日修正之第9條第1項本文規定:「依 第6條第1項應設置消防安全設備場所,其管理權人 應委託第8條所規定之消防設備師或消防設備士, 定期檢修消防安全設備,其檢修結果應依限報請當 地消防機關備查;消防機關得視需要派員複查。」 99年5月19日修正之第37條規定:「違反第6條第1 項消防安全設備、第4項住宅用火災警報器設置、 維護之規定或第11條第1項防焰物品使用之規定, 經通知限期改善,逾期不改善或複查不合規定者, 處其管理權人新臺幣6千元以上3萬元以下罰鍰;經 處罰鍰後仍不改善者,得連續處罰,並得予以30日 以下之停業或停止其使用之處分(第1項)。規避、 妨礙或拒絕第6條第2項之檢查、複查者,處新臺幣 3千元以上1萬5千元以下罰鍰,並按次處罰及強制 執行檢查、複查(第2項)。」 (二)98年11月27日修正之「各類場所消防安全設備檢修 及申報作業基準」第一篇第5點第1項規定:「管理 權人申報其檢修結果之期限,其為各類場所消防安 全設備設置標準規定之甲類場所者,每半年1次, 即每年6月30日及12月31日前申報……。」92年9月 24日發布之「消防機關受理消防安全設備檢修申報 及複查注意事項」,關於檢修申報受理作業,一 (三)1規定:「受理申報時,應查核消防安全設備 檢修申報書、表等相關文件(管理權人如委託他人 辦理申報時,應檢附委託書),並填具『消防安全 設備檢修申報受理單』(如附件二)一式二份,蓋章 受理後,一份自存,一份交付管理權人或受委託 人。經查核申報資料不合規定者,應將不合規定項
48
目詳為列舉,一次告知補正或改善。」關於複查作 業,二(四)本文規定:「進行複查作業應依『消防 機關辦理消防安全檢查注意事項』辦理。專業性複 查時,應以查閱檢修報告書、詢問及實地測詴等方 式,執行下列事項,以瞭解消防設備師(士)有無不 實檢修情事,並製作消防安全設備檢修申報複查紀 錄表,複查結果列入管制。」 (三)經查新屋保齡球館(原亞洲保齡球館)係屬各類場 所消防安全設備設置標準第12條所規定之甲類場 所,依上開規定,其管理權人劉得斌每半年應委託 消防法第8條所規定之消防設備師或消防設備士, 實施檢修消防安全設備,其檢修結果應製作消防安 全設備檢修申報書及改善計劃書,報請當地消防機 關即桃園縣政府(已改制為桃園市政府)消防局新 屋分隊備查,消防機關依「消防機關受理消防安全 設備檢修申報及複查注意事項」應就消防安全設備 檢修申報書之申報內容進行複查,以查核消防設備 師(士)有無不實檢修情事,若場所管理權人未依規 定設置、維護其消防安全設備,依消防法第37條第 1項規定,經通知限期改善,逾期不改善或複查不 合規定者,處其管理權人6千元以上3萬元以下罰 鍰,經處罰鍰後仍不改善者,得連續處罰,並得予 以30日以下之停業或停止其使用之處分。 (四)新屋保齡球館管理權人委託消防設備師(士)檢修 申報及新屋分隊辦理安檢情形如下: 檢修申報 (複查)日 設備師(士)檢修申報 新屋分隊消防安全檢查 專技人員 (案件聯絡) 改善計畫書摘要 核章人 安全檢查結果 98.06.16
王欽楷 謝建勝 消防設備,合格。 98.07.14
王欽楷 金玉振 消防設備,合格。 99.01.15
林文智 春節專案,計於 「滅火器、火警自 動警報設備、防火
49
檢修申報 (複查)日 設備師(士)檢修申報 新屋分隊消防安全檢查 專技人員 (案件聯絡) 改善計畫書摘要 核章人 安全檢查結果 管理」勾選符合。 99.07.09 43 (99.07.06檢查)
胡志偉 設備士 (林勝國) 99年上半年檢 修申報,缺失 如改善計畫書 所載 44。
- 07.30
林文智 吳尚城 計於「滅火器、火 警自動警報設 備、緊急廣播設備 及防火管理」勾選 符合。 99.08.11
林文智 吳尚城 計於「滅火器、室 內外消防栓設 備、火警自動廣播 設備、緊急廣播設 備、出口標示燈、 避難方向指示 燈、緊急照明設備 及防火管理」勾選 符合。 99.10.22 (99.10.21檢查)
徐維淂 設備士 (林勝國) 99年下半年檢 修申報,消防 主系統缺失 45,與前次申報 同。
99 年下半年檢修 申報。 99.12.23
林文智 吳尚城 計於「出口標示 燈、避難方向指示 燈、緊急照明設備 及防火管理」勾選 符合。
100.03.23
林文智 吳尚城 勾選「室內消防栓 設備:幫浦組件故 障、火警自動警報 設備:受信總機故 障、緊急廣播設 43 99.10.09、99.10.22、100.06.07、101.02.13、101.06.21、101.11.21、102.05.15、 103.07.03、103.12.08 檢修申報之案件聯絡人,均為林勝國。 44 室內消防栓設備:1.控制盤電壓表故障/開關未定位/呼水槽浮球故障;2.加壓送水裝置無 法持壓,無法實施性能測試。 。 自動撒水設備:1.加壓送水裝置無持壓,無法實施性能測試。 。2.……。 火警自動警報設備:1.受信總機開關未定位/迴路線路未接/預備電源故障。2.第1~5 迴路火 災誤報,迴路拆除,探測器均無動作。3.第7 迴路斷線/標示燈故障1 只。4.受信總機預備電 池故障。緊急廣播設備:1.廣播主機預備電源故障。 45 室內消防栓、自動撒水、火警自動警報及緊急廣播等設備之故障情形,與99 年上半年申報 同。
50
檢修申報 (複查)日 設備師(士)檢修申報 新屋分隊消防安全檢查 專技人員 (案件聯絡) 改善計畫書摘要 核章人 安全檢查結果 備:預備電池故 障」。開立限改單 038175。
100.05.18
林文智 吳尚城 故障情形,同 100.03.23 檢查結 果,迄未改善,開 限改單。開立裁罰 單,100.06.03 裁 罰1萬2千元。 100.06.03 舉發違反消防法 案件通知單(編號 006003) 100.06.07 (100.06.03檢查)
徐維淂 設備士 (林勝國) 100 年上半年 檢修申報,所 列消防主系統 缺失 46 ,與 99.10.21 檢 查、99.10.22 申報同。
- 07.29
林文智 吳尚城 於「滅火器、室內 外消防栓設備、火 警自動警報設 備、緊急廣播設 備、出口標示燈、 避難方向指示 燈、緊急照明設備 及防火管理」勾選 符合 47。 101.01.03
莊翔智 吳尚城 設備「符合」欄均 未勾選,備註:100 年未檢修申報。 101.02.13 (101.02.09檢查)
蘇進發 設備師 (林勝國) 100 年下半年 檢修申報,所 列缺失 48,與前
46 室內消防栓設備:1.控制盤電壓表故障/開關未定位/呼水槽浮球故障;2.加壓送水裝置無 法持壓,無法實施性能測試。 。 自動撒水設備:1.撒水馬達控制盤線路故障,無法進行所有相關測試。 。 火警自動警報設備:第1L~7L 迴路火災誤報,迴路拆除,所有探測器均無動作。 緊急廣播設備:1.廣播主機預備電源故障。2.主機未與火警連動。 47 按林文智104 年4 月20 日訊問筆錄,因為長官希望給業者改善時間,讓業者有改善空間, 所以先給他合格。 48 依消防安全設備檢修申報書,消防設備師蘇進發於101 年2 月9 日檢查亞洲保齡球館之消 防安全設備,改善計畫書略以: 室內消防栓設備:1.控制盤電壓表故障/開關未定位/呼水槽浮球故障;2.加壓送水裝置無法
51
檢修申報 (複查)日 設備師(士)檢修申報 新屋分隊消防安全檢查 專技人員 (案件聯絡) 改善計畫書摘要 核章人 安全檢查結果 次申報同。 101.02.15
莊翔智 吳尚城 新屋分隊消防安 全檢查紀錄表,全 部空白,各設備符 合欄均未勾選。但 備註欄:「檢修申 報,複查符合」。 101.06.21 (101.11.20檢查)
胡志偉 設備士 (林勝國) 101 年上半年 檢修申報缺失 49,與前次申報
同。
- 07.01
莊翔智 吳尚城 消防安全檢查紀 錄表,計於「滅火 器、防焰規劃、火 警自動警報設 備、緊急廣播設 備、發電機、出口 標示燈、避難方向 指示燈、緊急照明 設備及防火管 理」,勾選符合。 消防安全設備檢 修申報複查紀錄 表(101.07.15,莊 翔智)。 101.07.07
莊翔智 吳尚城 計於「滅火器、火 警自動警報設 備、緊急廣播設 備、發電機、出口 標示燈、避難方向 指示燈、緊急照明 設備及防火管理」
持壓,無法實施性能測試。 。 自動撒水設備:1.撒水馬達控制盤線路故障,無法進行所有相關測試。 。 火警自動警報設備:第1L~5L 火災誤報,迴路拆除。 緊急廣播設備:1.廣播主機預備電源故障。2.主機未與火警連動。 49 依消防安全設備檢修申報書,胡志偉消防設備士於101.06.20 檢查亞洲保齡球館之消防安 全設備,改善計畫書略以: 室內消防栓設備:1.控制盤電壓表故障/開關未定位/呼水槽浮球故障;2.加壓送水裝置無法 持壓,無法實施性能測試。 。 自動撒水設備:1.撒水馬達控制盤線路故障,無法進行所有相關測試。 。 火警自動警報設備:第1L~5L 火災誤報,迴路拆除。 緊急廣播設備:1.廣播主機預備電源故障。2.主機未與火警連動。
52
檢修申報 (複查)日 設備師(士)檢修申報 新屋分隊消防安全檢查 專技人員 (案件聯絡) 改善計畫書摘要 核章人 安全檢查結果 勾選符合。 101.10.11
莊翔智 吳尚城 備註:101年未依 規定委託消防專 技術人員或專業 檢修機構檢修消 防設備。 101.10.25
莊翔智 謝建勝 計於「滅火器、室 內外消防栓設 備、火警自動警報 設備、緊急廣播設 備、緊急電源、出 口標示燈、避難方 向指示燈、緊急照 明設備及防火管 理」勾選符合。 101.11.21 (101.11.20檢查) 蘇進發 設備師 (林勝國) 101年下半年 申報缺失 50,與 前次申報同。
- 12.22
莊翔智 吳尚城 消防安全檢查紀 錄表,計於「滅火 器、火警自動警報 設備、緊急廣播設 備、發電機、出口 標示燈、緊急照明 設備及防火管理」 勾 選 符 合 。 101.12.22 ,消防 安全設備檢修申 報複查合格(莊翔 智)。 102.02.05
彭安宗 51 吳尚城 消防安全檢查紀 錄表,計於「滅火 器、室內外消防栓 設備、自動撒水設 備、防焰規劃、火 警自動警報設 備、緊急廣播設
50 室內消防栓設備:1.控制盤電壓表故障/開關未定位/呼水槽浮球故障。2.加壓送水裝置無 法持壓,無法實施性能測試。 。 自動撒水設備檢查表:撒水馬達控制盤線路故障,無法進行所有相關測試。 。 火警自動警報設備:第1L~5L 火災誤報,迴路拆除。 緊急廣播設備:1.廣播主機預備電源故障。2.主機未與火警連動。 51 彭安宗,自承登載不實,詳桃園地檢署偵查卷偽造文書卷3 第158 頁。
53
檢修申報 (複查)日 設備師(士)檢修申報 新屋分隊消防安全檢查 專技人員 (案件聯絡) 改善計畫書摘要 核章人 安全檢查結果 備、出口標示燈、 避難方向指示 燈、緊急照明設 備、連結送水管、 消防專用蓄水池」 勾選符合,另備 註:複核符合防火 管 理 限 改 047938 。 102.02.05 消防安 全設備檢修申報 複查合格( 彭安 宗,對應101年下 半年檢修申報)。 102.04.11
彭安宗 吳尚城 101下半年檢修申 報,未申報。 消防安全檢查紀 錄表備註:「2013 年上半年檢修申 報未依規定委託 專業技術人員或 專業檢修機構檢 查消防設備,開立 052953限改單」。 102.05.15 (102.05.14檢查) 蘇進發 設備師 (林勝國) 室內消防栓, 加壓送水裝置 無法持壓,無 法實施性能測 試 ;自動撒水 ;自動撒水 馬達控制盤線 路故障,無法 進行相關測 試 ;火警自動 ;火警自動 警報第1L~5L 火災誤報,迴 路拆除等。
- 06.28
彭安宗 吳尚城 因室內消防栓設 備無法持壓等,開 立編號052978 限 期改善通知單。 102.07.02
彭安宗 吳尚城 102年暑期青春專 案檢查,計於「滅 火器、出口標示燈
54
檢修申報 (複查)日 設備師(士)檢修申報 新屋分隊消防安全檢查 專技人員 (案件聯絡) 改善計畫書摘要 核章人 安全檢查結果 及及緊急照明設 備」勾選符合。 102.07.02 消防安 全設備檢修申報 複查合格( 彭安 宗,對應102年上 半年檢修申報)。 102.12.22
備註:102下半 年未申報 彭安宗 52 吳尚城 春節人潮眾多場 所專案檢查,計於 「滅火器、室內外 消防栓設備、自動 撒水設備、防焰規 劃、火警自動警報 設備、緊急廣播設 備、發電機、出口 標示燈及避難方 向指示燈、緊急照 明設備、連結送水 管、消防專用蓄水 池」勾選符合。 102.12.22 消防安 全設備檢修申報 複查合格( 彭安 宗,對應102年上 半年檢修申報)。 103.01.10
彭安宗 53 吳尚城 春節人潮眾多場 所專案檢查,於 「滅火器、室內外 消防栓設備、自動 撒水設備、防焰規 劃、火警自動警報 設備、緊急廣播設 備、發電機、出口 標示燈及避難方 向指示燈、緊急照 明設備、連結送水 管、消防專用蓄水 池」勾選符合。 103.01.14
彭安宗 吳尚城 開立限改058164 號,2013下半年未
52 彭安宗自承登載不實,詳桃園地檢署104 偵字第4144 偵查卷三 P159。 53 彭安宗自承登載不實,詳桃園地檢署104 偵字第4144 偵查卷三 P159。
55
檢修申報 (複查)日 設備師(士)檢修申報 新屋分隊消防安全檢查 專技人員 (案件聯絡) 改善計畫書摘要 核章人 安全檢查結果 實施自衛消防編 組訓練,開立 058164號限改單。 103.02.19
賴俊鋐 備註:防火管理複 查符合。 103.07.03 (103.06.30檢查)
蔡馨怡 設備士 (林勝國) 室內消防栓, 加壓送水裝置 無法持壓,無 法實施性能測 試 ;自動撒水 ;自動撒水 馬達控制盤線 路故障,無法 進行相關測 試 ;火警自動 ;火警自動 警報第1L~5L 火災誤報,迴 路拆除等。
- 07.24
賴俊鋐 湯佳興 青春專案,計於 「滅火器、室內外 消防栓設備、火警 自動警報設備、緊 急廣播設備、發電 機、出口標示燈、 緊急照明設備」勾 選符合。 103.07.24 消防安 全設備檢修申報 複查紀錄表(賴俊 鋐,對應103上半 年檢修申報)。 103.12.08 (103.12.05檢查)
吳昌桂 設備士 (林勝國) 室內消防栓, 加壓送水裝置 無法持壓,無 法實施性能測 試 ;自動撒水 ;自動撒水 馬達控制盤線 路故障,無法 進行相關測 試 ;火警自動 ;火警自動 警報第1L~5L 火災誤報,迴 路拆除等。
(五)經查新屋分隊隊員林文智、莊翔智、彭安宗及賴俊
56
鋐、分隊長吳尚城、小隊長謝建勝均知悉新屋保齡 球館依各類場所消防安全設備設置標準規定,應設 置滅火器、室內消防栓設備、自動灑水設備、火警 自動警報設備、緊急廣播設備、標示設備、緊急照 明設備、消防專用蓄水池等,且該保齡球館之上開 消防安全設備設置項目均有缺失,其在辦理安檢業 務時,竟為下列違失行為: 1、林文智於100年3月23日至新屋保齡球館進行消 防安全檢查時,查知該處在室內消防栓設備之幫 浦組件故障、火警自動警報設備之受信總機故 障、緊急廣播設備之預備電池故障,即如實登載 於「桃園縣政府消防局第二大隊新屋分隊消防安 全檢查紀錄表」,並開立限期改善通知單(一) 54; 林文智於100年5月18日至上址檢查時,上開缺失 仍無改善,林文智再如實登載於「桃園縣政府消 防局第二大隊新屋分隊消防安全檢查紀錄表」, 並開立限期改善通知單(二) 55、舉發違反消防法 案件通知單(一)。該場所管理權人劉○○仍未依 限改善,遭桃園縣政府於100年6月3日處12,000 元罰鍰。100年7月間,吳尚城告訴林文智就新屋 保齡球館之消防安全設備檢查情形切勿再如實 登載,謝建勝告訴林文智新屋保齡球館之消防安 全檢查應該要放水。嗣林文智於100年7月29日至 新屋保齡球館進行消防安全設備檢查時,明知該 場所:室內消防栓設備之幫浦組件故障、火警自 動警報設備之受信總機故障、緊急廣播設備之預 備電池故障,卻在「桃園縣政府消防局第二大隊 新屋分隊消防安全檢查紀錄表」上,就上開項目 均勾選合格,並在檢查人員欄處蓋章,表示已就
54 編號03875。 55 編號38184。
57
上開消防設備檢查完畢。吳尚城明知上開登載不 實情事,仍在主管核閱欄處蓋章,表示核可上開 消防安全檢查紀錄表後,此消防安全檢查紀錄表 置放於新屋分隊存查。因此,新屋保齡球館管理 權人有恃無恐,就上開消防設備故障情事置之不 理,從未修繕,使其不須改善缺失即 改善缺失即可繼續營 業,免於支付改善缺失所需費用之不法利益。 益。 2、莊翔智、謝建勝、吳尚城均明知新屋保齡球館有 消防安全設備缺失情形,卻為下列行為:1.莊翔 智於101年7月1日進行消防安全檢查時,在「桃 園縣政府消防局第二大隊新屋分隊消防安全檢 查紀錄表」,就滅火器、火警自動警報設備、緊 急廣播設備、發電機、出口標示燈、避難方向指 示燈、緊急照明設備等項目勾選合格。同時在「桃 園縣政府消防第二大隊新屋分隊消防安全設備 檢修申報複查紀錄表」上,就室內外消防栓設備 登載:於1 樓進行放水試驗,瞄子出水壓力 驗,瞄子出水壓力 1.7kg/cm 2,就火警自動警報設備登載:於1受信 總機進行測試,於 ,於1F進行警鈴音響測試,音壓為 ,音壓為 92分貝,於1F對探測器進行動作 試驗,測試結果 結果 符合。2. 莊翔智於101年7月7日進行消防安全檢 查時,在「桃園縣政府消防局第二大隊新屋分隊 消防安全檢查紀錄表」,就滅火器、室內外消防 栓設備、火警自動警報設備、緊急廣播設備、發 電機、出口標示燈、避難方向指示燈、緊急照明 設備等項目勾選合格。3.莊翔智於101年10月25 日進行消防安全檢查時,卻在「桃園縣政府消防 局第二大隊新屋分隊消防安全檢查紀錄表」,就 滅火器、室內消防栓設備、火警自動警報設備、 緊急廣播設備、標示設備、緊急照明設備等項目 勾選合格。4.莊翔智於101年12月22日進行檢修
58
申報複查時,卻在「桃園縣政府消防局第二大隊 新屋分隊消防安全設備檢修申報複查紀錄表」, 就滅火器登載:抽查1樓滅火器2支、室內消防栓 設備登載:於1樓進行放水試驗,瞄子出水壓力 驗,瞄子出水壓力 1.7kg/cm 2、火警自動警報設備登載:於1受信總 機進行測試,於 ,於1F進行警鈴音響測試,音壓為 ,音壓為92 分貝,於1F對探測器進行動作試驗、緊急廣播設 驗、緊急廣播設 備登載:於1F進行音壓測 試,測試結果 結果90dB,測 試 結果符合 結果符合規定,並在上開紀錄表檢(複)查人員 欄處蓋章。吳尚城則在主管核閱欄處以分隊長代 理人身分蓋章(101.10.25謝建勝以分隊長身分 代理),表示核可上開消防安全檢查紀錄表。上 開紀錄表均置放於新屋分隊存查,使新屋保齡球 館之管理權人不須改善缺失即可繼續營業,免於 改善缺失即可繼續營業,免於 支付改善缺失所需費用之不法利益。 益。 3、彭安宗、吳尚城明知新屋保齡球館消防安全設備 缺失情形,彭安宗卻為下列行為:1、於102年2 月5日進行消防安全檢查時,在「桃園縣政府消 防局第二大隊新屋分隊消防安全設備檢修申報 複查紀錄表」上,就室內消防栓設備中登載:於 2樓進行放水試 驗,瞄子出水壓力2kg/cm 2;於自 動警報設備登載:於2樓受信總機進行測試,於 ,於2 樓進行警鈴音響測試,音壓為 ,音壓為92分貝,於2樓對 探測器進行動作試驗符合規定;於緊急廣播設備 驗符合規定;於緊急廣播設備 登載:於2樓進行音壓測 試,測試結果符合規定。 結果符合規定。 2.於102年7月2日進行暑期青春專案檢查時,就 滅火器、出口標示燈、緊急照明設備項目勾選合 格,同時在「桃園縣政府消防局第二大隊新屋分 隊消防安全設備檢修申報複查紀錄表」上,就滅 火器登載:抽查2樓滅火器2支。3.於102年12月 22日進行消防安全檢查時,在「桃園縣政府消防
59
局第二大隊新屋分隊消防安全檢查紀錄表」上, 就滅火器、室內消防栓、自動灑水設備、火警自 動警報設備、緊急廣播設備、標示設備、緊急照 明設備、消防專用蓄水池等8項目全勾選合格, 同時在「桃園縣政府消防局第二大隊新屋分隊消 防安全設備檢修申報複查紀錄表」上,就室內消 防栓設備中登載:於2樓進行放水試驗,瞄子出 驗,瞄子出 水壓力2.3kg/cm 2;火警自動警報設備登載:於2 樓受信總機進行測試,於 ,於2樓進行警鈴音響測 試 ,音壓為 ,音壓為92分貝,於2樓對探測器進行動作試 驗符合;於緊急廣播設備登載:於2樓進行音壓 測試,測試結果符合。 結果符合。4.於103年1月10日進行消 防安全檢查時,在「桃園縣政府消防局第二大隊 新屋分隊消防安全檢查紀錄表」,就滅火器、室 內消防栓設備、自動灑水設備、火警自動警報設 備、緊急廣播設備、標示設備、緊急照明設備、 消防專用蓄水池等8項目全勾選合格,並均在上 開紀錄表之檢(複)查人員欄處蓋章,表示已就上 開消防設備檢查完畢。吳尚城則在上述文書主管 核閱欄處蓋章,表示核可上開紀錄表。上開紀錄 表均置放於新屋分隊存查,使新屋保齡球館之管 理權人不須改善缺失即可繼續營業,免於支付改 改善缺失即可繼續營業,免於支付改 善缺失所需費用之不法利益。 益。 4、賴俊鋐明知該場所消防安全設備缺失情形,於 103年7月24日進行消防安全檢查時,在「桃園縣 政府消防局第二大隊新屋分隊消防安全檢查紀 錄表」上,在滅火器、室內消防栓設備、自動灑 水設備、火警自動警報設備、緊急廣播設備、標 示設備、緊急照明設備等項目全勾選合格,同時 在「桃園縣政府消防局第二大隊新屋分隊消防安 全設備檢修申報複查紀錄表」上,就室內消防栓
60
設備中登載:於2樓進行放水試驗,瞄子出水壓 驗,瞄子出水壓 力1.7kg/cm 2,於火警自動警報設備登載:於2樓 受信總機進行測試,於 ,於2樓進行警鈴音響測試, , 音壓為91分貝,於2樓對探測器進行動作試驗; 驗; 於緊急廣播設備登載:於2樓進行音壓測試,測 ,測 試 結果良好,並均在上開 結果良好,並均在上開紀錄表檢查人員欄處蓋 章,表示已就上開消防設備檢查完畢後,上開紀 錄表,即均置放於新屋分隊存查,使新屋保齡球 館之管理權人不須改善缺失即可繼續營業,免於 改善缺失即可繼續營業,免於 支付改善缺失所需費用之不法利益。 益。 (六)上開事實,經本院向桃園地檢署調閱卷宗查明結 果,林文智、莊翔智、彭安宗及賴俊鋐於桃園市調 查處調查時及桃園地檢署偵訊時均坦承不諱,吳尚 城、謝建勝亦調查及偵訊時均坦承在上開紀錄表上 核章等事實,林文智且於偵查中具結證述吳尚城、 謝建勝曾請其不要如實登載以免劉○○再受處罰 之事實,並經證人即受劉○○委託檢修安全設備之 專門技術人員徐維淂、蘇進發、胡志偉、蔡馨怡、 吳昌桂及接洽人林勝國於偵查中結證明確,且有改 善通知單、裁處書、估價單及歷次之檢查紀錄表、 複查紀錄表、檢修申報書於偵查卷內可稽,可信為 真實。本院106年8月30日詢問時,林文智、莊翔智、 彭安宗、賴俊鋐、吳尚城、謝建勝雖均否認有登載 不實之事實,林文智辯禒:「(問:……100年7月 間,吳尚城分隊長、謝建勝小隊長先後指示您放 水,以上是否正確?)沒有,當時是我臆測的,與 事實不符,我應訊時與實際狀況時已忘記。」、 「(問:到底有沒有人對你關說?)沒有」、「(問: 為何在檢察官那邊說被施壓?)當初在調查站那邊 有被暗示。」等語;莊翔智辯禒:「(問:複查紀 錄表上都同樣的設備壞掉?)檢察官只相信消防設
61
備師士都有檢查,我們去檢查以現場設備冹定」等 語;彭安宗辯禒:「(問:(提示偵查筆錄)為何現 在否認登載不實?)當初答的意思是所有項目,但 檢查規定是抽查,沒有辦法檢查到細項的部分。我 的意思是抽查沒有辦法到每一個細項。內容也有提 到為是時間有限,所以是抽查方式來做。」、「(問: 複查時應瞭解申報內容有無不實檢修,應看其內容 有無不實?)我是以目前實際狀況來做檢查,檢查 不是以檢修申報書的為準。」等語;賴俊鋐辯禒: 「(問:有沒有一一檢查?)當時沒有所謂的一一檢 查,我們檢查時會看一下檢修申報書,去實地測 詴,且去的時候只能抽測,沒有辦法像設備師士詳 細檢查。」等語;吳尚城辯禒:「(問:如何確認 有缺失已改善?)同仁都依局規定抽查且複查紀錄 表必要項目抽查且登載其檢查位置情形等。」、 「(問:……新屋分隊隊員指您曾施壓讓新屋保齡 球館通過消防安全設備,您有何說明?)沒有。這 個部分,他在地院開庭時,表示他被市調站偵查員 的誘導。且事實上我就沒有去關說,我也不瞭解該 場所好或不好。」等語;謝建勝辯禒:「(問:林 文智表示你曾關心,不要再勾選不合格,有何說 明?)這部分有答辯過,從來沒有指示過,且林文 智也向庭上表示沒有。」等語。惟林文智、莊翔智、 彭安宗均未能就其於調查時受不當影響之事實舉 證以實其說,且其等於偵查中亦坦承犯行,故所辯 並無可採。莊翔智雖辯禒:上開紀錄表係因確實檢 查及複查後始記載合格,消防設備師(士)之檢修申 報書所記載之缺失不實在云云。惟如前所述,消防 機關依「消防機關受理消防安全設備檢修申報及複 查注意事項」應就消防安全設備檢修申報書之申報 內容進行複查,以查核消防設備師(士)有無不實檢
62
修情事,惟林文智、莊翔智、彭安宗、賴俊鋐、吳 尚城、謝建勝歷次檢查時均無發現消防設備師(士) 有不實檢修情事,彭安宗且於本院詢問時承認其並 未依檢修申報書所記載之缺失進行檢查及複查等 語,參以本件火災發生時,火災自動警報設備、緊 急廣播設備、自動灑水設備等均未發生作用,致使 居住於1樓之劉得斌對火災發生渾然不知,直到濃 煙冒出屋外,才由鄰居報警處理,故莊翔智辯禒其 等就本案建物之消防安全設備均確實檢查才記載 合格,消防設備師(士)之檢修申報書所記載之缺失 不實在云云,亦無足採。林文智雖禒:吳尚城、謝 建勝並未告訴其不要如實填載云云,惟其於刑案調 查及偵訊中均證禒吳尚城、謝建勝告訴其不要如實 填載等語,且於偵查中具結所為證言係屬真實,其 於本院詢問時所為上開證詞,顯係事後迴護之詞, 不足採信。退步而言,倘若其於本院詢問時所為上 開證詞係屬真實,則依法應負偽證罪責。 (七)綜上,桃園縣政府消防局新屋分隊分隊長吳尚城及 小隊長謝建勝於100年7月間叫該隊隊員林文智就 該保齡球館之消防安全設備檢查勿如實登載、應該 要放水。此後,隊員林文智、吳尚城、謝建勝及該 隊隊員莊翔智、彭安宗、賴俊鋐等,雖明知自100 年6月3日至103年6月30日止,該保齡球館前後共6 次委託專門技術人員檢查並提出「消防安全設備檢 修申報書」,均記載滅火器、室內消防栓設備、自 動撒水設備、火警自動警報設備、緊急廣播設備、 消防專用蓄水池等6項目持續存在多項相同缺失, 從未進行改善,卻分冸自100年7月29日起至103年7 月24日止辦理消防安全檢查或複查時,各自在「桃 園縣政府消防局第二大隊新屋分隊消防安全檢查 紀錄表」、「桃園縣政府消防局第二大隊新屋分隊
63
消防安全檢查紀錄表」上,由林文智、莊翔智、彭 安宗或賴俊鋐就上開項目均勾選合格並在檢查人 員欄處蓋章,由吳尚城或謝建勝在主管核閱欄處蓋 章後,將上開紀錄表置放於新屋分隊存查,使新屋 保齡球館之管理權人不頇改善缺失即可繼續營 業,免於支付改善缺失所需費用。嗣該保齡球館於 103年12月5日委託專門技術人員檢查所提出「消防 安全設備檢修申報書」上仍記載上開6項目存在相 同缺失。林文智等6人之上開違失行為,構成偽造 文書罪,且造成104年1月20日發生本件火災時,火 災自動警報設備、緊急廣播設備、自動灑水設備等 均未發生作用,致使火災不能經由火災自動警報設 備、緊急廣播設備、自動灑水設備快速查覺、快速 熄滅,居住於1樓之劉得斌對火災發生渾然不知, 直到濃煙冒出屋外,才由鄰居報警處理。桃園地檢 署檢察官亦為相同之認定,對林文智等6人以涉犯 公務員明知為不實之事項而登載於職務上所掌之 公文書、貪污治罪條例第6條第1項第4款對於主管 或監督之事務明知違背法令間接圖其他私人不法 冺益罪嫌提起公訴在案,核有嚴重違失。該府消防 局對於「檢修申報結果一再不合格,複查結果一再 合格問題未能列管,致新屋消防分隊消防安檢放水 情事長期存在,安檢流於形式,顯有違失。
九、本案建物為大型密閉鐵皮屋,縱深約75公尺,後方2 樓設有冷卻水塔帄台,亦有門可供進入2樓後方,可 作為直接攻擊火點用,只要使用雙節梯,不頇派員進 入室內,即可就近灑水滅火。救火指揮官湯佳興於抵 達火場初期凌晨2時09分即知悉火災起火點在建物後 方,並知悉劉○○已將後門打開,且於第1梯次人員 撤出,第2梯次人員尚未進入時,即知悉建物內受困
64
居民已經全部救出,卻未詢問第1梯次入室人員火場 狀況,掌握水帶可否進入有效攻擊位置情形,即貿然 決定,不頇派任何人員從建築物後方外面冷卻水塔或 以雙節梯直接攻擊火點,而派第2、3梯次人員從前方 進入室內搜救,造成2時56分許全面燃燒後,6名年輕 消防員無法撤出而殉職,顯有違失。 (一)依桃園縣政府消防局消防工作實務手冊 56第二篇、 貳、一、(六)火災搶救要領與注意事項規定,「閃 燃(Flashover)」,係指在室內火警初期因溫度逐 漸升高而引起的一禑現象。火勢增強時,若火場內 的溫度升至攝氏650度或以上時,火場內所有物品 已達火燃點都會自動燃燒,而室內的可燃物質便會 因火勢溫度而分解出可燃性氣體,過程中所產生的 熱氣體便會上升至天花板而帄面擴散,被分解出來 的可燃性氣體再得到足夠的熱量時便會燃燒,這禑 全面性的同時燃燒禒為閃燃。認識閃燃,屬消防人 員之基本素養。 (二)104年1月20日凌晨2時02分許,桃園市政府消防局 救災救護指揮中心(下禒119救災救護指揮中心)接 獲民眾報案,指新屋區中興北路發生火警,遂通知 各消防單位前往救災。轄區新屋分隊接獲119救災 救護指揮中心(無線電代號:漢水)通報後,由分隊 長湯佳興率(救火指揮官,代號新屋01)所屬隊員莊 朝涵(駕駛新屋11水箱車)、莊翔智(駕駛新屋61水 庫車)、賴俊鋐(駕駛新屋13水箱車)、黃品豪(駕駛 新屋92救護車)及黃偉鈞(實習生)等6人,於凌晨2 時09分:「救災人車到達現場,建築物正面未見火 煙,現場關係人(劉○○)表示建築物2樓後側機房 起火燃燒,有人員受困。」2時12分:「新屋61部 署水線中繼供水予新屋13車,新屋01勘查建築物後
56 桃園縣政府98 年2 月20 日修正。
65
側火勢,回報指揮中心有濃煙竄出」,此有桃園市 政府消防局「104年1月20日新屋區中興北路101號 火災搶救報告書」參之一(火災動態及處置狀況)在 卷可參,足徵救火指揮官湯佳興於凌晨2時09分即 知起火點在保齡球館後方。之後,凌晨2時13分許 桃園市政府消防局第二救災救護大隊富岡分隊(下 禒富岡分隊)、新屋分隊曾重仁(02:23)、林家慶( 02:23)、永安分隊(02:25)、觀音分隊(02:25) 、草漯分隊(02:30)陸續抵達火災現場。救火指揮 官於2時30分許無線呼叫現場同仁,告知延燒地方 在後側,火點在後面 57。2時41分許,新屋01復以無 線呼叫表示火點在後方沒辦法深入,永安分隊長吳 尚城乃以無線呼叫「建築物的後方靠近土地公這邊 ,那業者說有一個通道可以上去,但是那個通道有 點窄小,只有小水箱車可以進來」。之後並與新屋 01、桃園市消防局特搜大隊第二特冸搜救救助分隊 (下禒二搜)分隊長相偕到建築物後面查看,「勘查 結果認為從後方一樓進入有危險,所以回到前方」 ,此有桃園市消防局119救災救護指揮中心通話譯 文、湯佳興104年7月29日詢問筆錄可稽。 (三)次查新屋保齡球館係鐵皮搭建之違章建築,2樓面 積約2,580帄方公尺、縱深約75公尺。依本院104年 1月29日履勘結果,球館後方2樓設有冷卻水塔帄台 (參見下圖),亦有門可供進入2樓後方,足可作為 直接攻擊火點用,對於滅火攻擊自有裨益。吳尚城 於104年1月22日檢方訊問禒:「接著我就到火場側 面走到後面,一直繞到後面去,去查看火勢,我就 發現後面水塔旁的鐵皮屋已經燒紅了,然後在我找 指揮官的途中,是在側邊巷內遇到業主劉○○,我
57 詳見桃園市政府消防局104 年2 月13 日桃消救字第1040004684 號函附無線電補充譯文, 略以:「新屋01 呼叫新屋現場那個同仁,延燒地方在後側在後側,火點在後面。」惟該局「火 災搶救報告書」對於延燒地點在後面並未交代。
66
遇到指揮官後,跟他報告要破壞後面的門,劉也在 旁邊,劉說不用,他可以從一樓裏面走到後面去開 門,我跟指揮官從巷子走到後面看,到達後門時, 劉已經把後門打開了,我就發現水塔旁,由樓梯口 往上看,兩側鐵皮燒得通紅,指揮官知道這情形, 說這邊太危險,由前面去做搶救,劉就把後門關起 來,指揮官就回到火場正面,我就去前面確保消防 車的水源,連接消防栓。」詢據湯佳興104年7月29 日詢問筆錄:「後面二樓有鐵梯及小門,梯子在裡 面,那時看有困難,因為是在正上方,當時沒有注 意冷卻水塔該處空間,且從建物後面也不知道內部 狀況,當時沒有注意到2樓冷卻水塔有帄台……」 等語,足見救火指揮官湯佳興未能善加冺用保齡球 館後方冷卻水塔帄台直接攻擊火點,錯失救災先 機。
新屋保齡球保後方冷卻水塔照片(本院實地履勘拍攝) (四)本院104年1月29日履勘火場,發現鐵捲門開口約80 ╳85公分,面積不到1帄方公尺,消防員透過此開口 佈線入室,除此之外,現場幾無其他開口。火場初 起 火 點
67
期搶救作為,湯佳興於2時17分搶救民眾2人,並切 開前方鐵捲門(約2時18分),尚屬妥適。惟其明知 起火點在建築物後方,不思從後方直接攻擊火點, 卻從前方佈線入內,所佈水線長度,104年1月24日 富岡分隊吳東奇於檢察官訊問時禒:「富岡分隊一 行同仁進入後,內部非常的暗,看不太到,當時是 還沒什麼煙,但是我們沒有看到火點」、「進去深 入的地點,就在鐵捲門附近」、「基本上就是大概 以一條水帶的長度,差不多20公尺,在鐵捲門附近 活動」等語。依譯文摘要,02:16:43受困2人已全 部救出 58;詢據湯佳興106年8月30日詢問筆錄:「二 個人救出時,切割鐵門時,約02:30」(問:何時 知道起火點在後方?)」等語,其於2:30第1梯次人 員撤出,第2梯次人員尚未進入時,即知悉起火點 在本案建物後側及該建物內居民已經離開。其雖辯 禒:通往後方之巷道狹窄,消防車無法進入,且「晚 上視線亦不清楚,當時看不到水塔那邊有門,也看 不出有空間,晚上也看不到窗戶。」等語。惟湯佳 興亦禒:可以使用雙節梯等語。另胡英達亦禒:天 暗,可以使用手電筒照明等語。因此,湯佳興所辯 並無足採。 (五)綜上,本案建築後方2樓設有冷卻水塔帄台,亦有 門可供進入2樓後方,火災發生時可作為直接攻擊 火點用,只要使用雙節梯登上帄台,不頇派員進入 室內,即可從後方灑水滅火。救火指揮官湯佳興於 抵達火場初期(凌晨2時09分)即知悉火災起火點在 建物後方,並知悉劉○○已將後門打開,且於第1 梯次人員撤出,第2梯次人員尚未進入時,即知悉 建物內受困居民已經全部救出,復未詢問第1梯次 入室人員火場狀況,掌握水帶可否進入有效攻擊位
58 經查劉○○等二人,係應指揮官要求從樓梯下來,非被救出。
68
置情形,即貿然決定,不頇派任何人員從建築物後 方外面冷卻水塔或以雙節梯直接攻擊火點,而派第 2、3梯次人員從前方進入室內搜救,造成2時56分 許全面燃燒後,6名年輕消防員無法撤出而殉職, 顯有違失。 十、救火指揮官湯佳興未依規定於入室搜索前先登錄管 制搜救小組之姓名、人數、時間及氣瓶壓力,且未指 派專人管制進出,致無人知悉室內救災人數。其於閃 燃前曾8次要求撤出火場,在2樓帄台準備入室之二搜 曾喊撤退、撤水線,後方水源因而遭人中斷,室內人 員因水帶扁塌無法循水線逃至室外,二搜在救出吳東 奇、黃鈺翔後,誤以為室內無人而率相關人員離開, 6名消防員喪失救援機會,湯佳興實有疏失。 (一)103 年3 月18 日內政部消防署消署救字第 1030600061號函修正之「消防機關火場指揮及搶救 作業要點」七、(五)、7及103年12月4日修正之「桃 園縣政府消防局火場指揮及搶救作業要點(改制後 繼續適用2年)七、(五)、7均規定:「……(3)由指 揮官分配各搜救小組搜救區域、聯絡信號,入室搜 索前應先登錄管制搜救小組『姓名』、『人數』、 『時間』、『氣瓶壓力』,每一區域搜索完畢後, 需標註記號,以避免重複搜索或遺漏搜索。(4)入 室搜索,應伴隨水線掩護,並預留緊急脫離路線。」 內政部消防署「消防人員救災安全手冊」(94年8月 第四版)第八章入室搜救安全注意事項第10點規 定:「入室搜救,應隨時提高警覺,遇濃煙影響以 致迷失方向,或感覺到有任何異狀發生情況緊急 時,切不可慌張、急躁,應立即循部署水帶之反方 向或安全確保繩退出火場」因此,救火指揮官命消 防員入室搜救前,應先登記管制入室搜救小組之姓 名、人數等,並伴隨水線掩護,預留緊急脫離路線。
69
消防署對於入室搜救後如何退出火場,亦有標準作 業程序。 (二)查104年1月20日凌晨2時許新屋保齡球館發生火 警,不幸造成永安分隊陳鳳翔(26歲 專26期)、蔡 長融(21歲 專31期)、陳彥茗(22歲 專31期)及觀音 分隊張桂彰(22歲 專30期)、草漯分隊謝君杰(29歲 專24期)、新屋分隊曾重仁(27歲 專26期)等6人殉 職。新坡分隊隊員黃鈺翔,係現場全面燃燒最後一 位自火場幸運脫離者,其於104年1月22日檢察官訊 問時禒:「我們在保齡球道上尋找火點,我們走約 七、八步距離,約保齡球道三分之一位置,……, 當時我不知道我們左側到房屋最底部還有這麼大 的距離,我問謝君杰說我們要不要往左邊射,謝君 杰說好,你們往左邊射,他再照一下,我就往左邊 射,但是仍未看見任何火光,應該是悶燒,後來衣 服有點燙,我記得學校受訓時,有說到閃燃溫度很 高,煙塵會越來越低,能見度越來越低,我問謝君 杰說是不是要撤退,他說再等一下,要我先做準 備,隨時準備撤離。這時我們身上都有無線電,謝 君杰說完話過沒多久後,約一分鐘左右,水帶突然 扁掉,當時我拿著瞄子,因為重力關係,水會往後 退,瞄子處的水帶會馬上扁掉,停水瞬間,我從無 線電聽到說火勢有竄出的情勢,外面有火光,請停 放撤退,停放就是指停止放水 59,但我不清楚是請 我們最前線的人停止放水,還是要後方的水箱車停 水,瞄子也是可以關水的,但我知道我的瞄子後面 的水帶就瞬間扁掉,謝君杰說快點撤,我們就撈起 水帶,到障礙物時,我們就摸不到水帶,我們要尋 求障礙物後方那一段要摸,但也摸不到,……」、 「我們開始撤退後,我聽到無線電傳來『撤退,撤
59 經查無線電譯文,並無「停放撤退」字眼。
70
退,立刻撤出火場』,此時是當我們要回頭跨越障 礙物當時聽到的」等語。其於105年3月15日本院詢 問時禒:「原本謝君杰學長擔任瞄子手,後來我從 我們左側聽到霹霹啪啪的聲音,告知謝君杰學長 後,謝君杰學長把瞄子交給我,由我擔任瞄子手, 而他自己站在我前方半步以手電筒尋找火源,不久 後,水帶突然扁塌,水帶扁塌是因後方水源中斷, 因重力的關係,水會往回流至低處,造成高處沒有 水,隨後就聽到無線電發出現場有火煙竄出,要求 現場人員撤出的訊息,一聽到撤出訊息,謝君杰學 長就大喊趕快撤,我們3位往後依扁塌水帶的方向 撤出,到一處障礙物後,因水帶是從障礙物下方穿 過去,所以我們詴圖從障礙物另一方向找尋下一段 水帶,但因水帶扁塌,造成我們無法輕易辨識水帶 在哪裡,一直沒有辦法找到下一段,兩位學長先跨 過障礙物後,輪到我要過去時,因消防鞋被障礙物 夾住,我怕過去時消防鞋會脫落,故先後退將消防 鞋拉出再跨過去,當我跨過去時,已沒有看到兩位 學長,我在原地大喊學長約15秒,沒人回應我後, 我依當時進來的方向以低姿勢尋找出口,儘量去碰 牆壁,後來碰觸牆壁找到一個洞口,但我不清楚是 否為出口,跨出去後本來還想走進去,此時有一位 學長拉住我,告知我已經出來了,並要帶我下去。」 依此陳述,黃鈺翔強調停水瞬間「火勢有竄出的情 勢,外面有火光,請停放撤退」,以及回頭跨越障 礙物時聽到之「「撤退,撤退,立刻撤出火場」, 均是從無線電聽到的。依無線電譯文,二搜01於2 時54分許向新屋01回報已撤出,新屋01表示「收 到」,現場斷水時間係在全面燃燒之前,斷水原因 與起訴書所禒全面燃燒後因移車需要切換消防車 動力分導器裝置(PTO,Power Take Off Device)無
71
關。 (三)為查明斷水是否真實,本院調閱警方密錄影片,並 與漢水錄音譯文、消防員權益促進會提供之97號鄰 宅監視器交互比對。其中,警方密錄影片因夜間、 現場煙霧及現場民眾遮住鏡頭而品質不佳,而警方 密錄影片又因電池用盡而僅錄至2時52分17秒許, 致02:53:17至02:56全面燃燒期間之關鍵畫面付 之闕如;另97號民宅監視器,則因監視器角度限 制,僅能錄到部分救災畫面,然本院仍逐一紀錄有 關畫面之特徵點,並交互比對,重建救災現場。其 時序確認過程,略以:首先,比對警方密錄影片與 桃園市政府消防局有線電話錄音,發現救火指揮官 湯佳興於當日02時28分04秒以其手機與救災救護 指揮中心聯絡,錄音長度19秒,嗣因故斷線,該中 心於02:28:17回撥,雙方通話錄音長度91秒。扣 除聲控系統為確保錄音完整性而自動加入之錄音 長度(6秒)後,研冹第2次實際通聯85秒,估計其於 02:29:42結束通話 60,正巧其結束通話之動作, 適為警方密錄影片於02:39:41時錄下。本院為確 信此唯一能比對二者時差之關鍵證據是否正確,於 105年10月3日請湯佳興協助檢視警方密錄影片 02:39:41時是否就是其結束與漢水通話之時,經 湯佳興於105年10月4日、106年1月4日確認無誤, 本院因此研冹警方密錄影片時間較漢水無線電譯 文時間快約10分01秒。至警方密錄影片與97號民宅 錄影之時差,因二者有部分共同影像,例如某轎車 於警方密錄影片02:40:39駛經圍牆轉角離開現場 (對應鄰宅監視器02:49:09)、新屋分隊莊翔智於 警方蒐證影像02:46:05自13車快跑至61車(鄰宅 監視器02:54:35)、於警方蒐證影像02:46:15
60 02:28:17 加85 秒。
72
自61車快跑至13車(鄰宅監視器02:54:45)及警方 蒐證影像03:00:35某體型微胖男子自火場走出來 (鄰宅監視器影03:09:05),可資研冹鄰宅監視器 較警方蒐證影像影片快約8分30秒,析言之,鄰宅 監視器較標準時間快約18分35秒,與起訴書載禒錄 影時間比標準時間快約19分鐘相當。上開重建時 序,於105年12月交付桃園市政府消防局,並與該 局多次研討,終獲該局106年5月15日桃消救字第 1060016075號函復,改按警方密錄影片畫面02: 39:17時,湯佳興正巧使用手機通話並走到警方密 錄前方,清楚錄到其講話內容「還沒有還沒有」, 比對該局電話錄音,於02:29:21錄到湯佳興與救 災救護指揮中心「還沒有還沒有」對話,因此可證 「警方密錄影片」叫「電話錄音(同無線電錄音)」 快約9分56秒,與本院原估計10分01秒相當。另該 局比對新屋分隊隊員林家慶於「警方密錄影片」 02:50:57,以及「97號鄰宅監視器」02:59:25 於新屋61車與圍牆間甩出第一條水帶落地畫面,直 接證明「97號鄰宅監視器」較「警方密錄影片」快 約8分28秒,亦與本院原估計8分30秒相當。基於一 致性考量,本院改依警方密錄影片較無線電錄音快 9分56秒,97號民宅監視器較警方密錄影片快8分28 秒校正三者之時差。其中,水源問題,經查迄2時 56分全面燃燒前3分鐘,新屋61水庫車仍呈溢水狀 態,研冹現場尚無水源不足情形。惟依校正後之時 序,發現新屋分隊吳朝涵奉二搜01之命下樓拿水 帶,但02時49分許吳朝涵就將水帶歸還給13車,並 未將水帶攜至樓上,其原因據吳朝涵所述,係因為 「整個建築物在漂黑煙,被嗆到」,顯見火場於2 時49分許就已經有所變化。 (四)惟查火場於2時56分許全面燃燒,在此之前,除新
73
屋分隊曾重仁係執行救護任務後自行入室外,前後 計分3梯次入室搜救。第1梯次為新屋分隊賴俊鋐、 吳朝涵等2人因氣瓶殘壓警報器響而退出,第2梯次 入室者為富岡分隊簡明倫、楊孟哲、吳東奇及趙威 懿等4人,第3梯次則有永安分隊陳鳳翔、蔡長融、 陳彥茗及觀音分隊張桂彰、草漯分隊謝君杰、新坡 分隊黃鈺翔等6人,各梯次入室前並未實施任務交 接。 1、富岡分隊吳東奇與趙威懿空氣瓶警報響後,退出 更換氣瓶,之後再入室找分隊長,吳東奇於災後 概述表稱:「再度入室後循水線與瞄子手等同仁 :「再度入室後循水線與瞄子手等同仁 會合,繼續搜索過程中,仍然感覺不到火點,突 然感覺到四周變的非常熱,當下直覺煙層下降至 脖子了,前方同仁立即大叫快撤,立即往出口方 向跑,……快到出口時,還是看不到出口,立即 大喊出口在哪,加上手電筒照射,在出口同仁有 聽到聲音後拉住我的消防衣將我引導出來」等 語。據此陳述,吳東奇係因再度入室後感覺四周 變得非常熱而決定撤出,並在出口附近被二搜救 出。 2、趙威懿於災後概述表稱:「……換完 :「……換完(氣瓶)後我 立刻又爬上2樓,沿著當時我們前進方向上的水 帶企圖找分隊長繼續幫忙他們,此時走了大概1 分多鐘,火場內部濃煙逐漸由灰轉黑,且迅速累 積至伸手不見五指的程度,同時熱度也急遽上 升,我聽見2樓平台上的同仁緊急呼喊快撤退, 台上的同仁緊急呼喊快撤退, 當時因為無法確認分隊長跟其他同仁是否還在 水線前方,所以我在當下還愣了幾秒鐘,並呼喊 分隊長,但不見有人回應,而當時環境越來越惡 劣,且周圍不斷有東西掉落,撤退的命令也越來 越急迫,此時我立即快步離開」、「退至2樓平
74
台時還見有三五位同仁在呼喊撤退,然後也聽到 撤掉水線的指令,此時我想到剛剛進去時距離鐵 皮拉門約4、5步的距離時,有看到一具瞄子,聽 到他們說撤水線時,本想由落地玻璃那側入口進 入,但當時濃煙已大到我不敢再進入,當下立刻 決定丟棄那一線,隨即下樓趕緊找簡分隊長跟學 弟」等語。趙威懿於104年1月24日檢察官訊問時 稱 :「進入後 :「進入後我沒找到分隊長,我沿著水線走, 當時二樓平台一群人員就喊撤退的指令,……, 台一群人員就喊撤退的指令,……, 後來能見度越來越糟,溫度越來越高,後面喊撤 退的人也越來越急,因為我進入時候是沿著水線 直行,後來我快步離開火場,沒有靠水線引導我 出來。」、「我出來後有看到平台上的人說要撤 台上的人說要撤 水線,撤水線的意思應該是說要把線上的人和水 線一起撤掉」語。 3、災後新屋分隊林家慶亦於火災檢討會概述表證 稱 :「二搜上來後 :「二搜上來後,二搜01指示我接大轉小雙叉, 發現溫度過高難以靠近,接著大量黑煙開始竄 出,二搜01下令水線撤退,我就跟著一起撤退。」 (五)依據前述趙威懿、林家慶之陳述,二搜當時發現火 場有變曾下達撤水線之指令。為此,本院105年5月 24日詢問桃園市政府消防局撤水線與撤退有何不 同,該局應詢書面資料陳禒:「一、『撤水線』與 『撤退』查無明確定義。經本局研討後認就本案內 部及迫近火場出入口附近救災人員而言,兩者並無 明顯差冸。二、因『撤水線』查無明確定義,故其 『時機』亦查無明確規範。三、經本局研討後認為 撤水線常見情形有:(一)火場處理完畢。(二)重新 部署改變進攻位置時。(三)當火場有危險危害消防 人員安全需緊急撤離時,由內部人員研冹環境、時 間是否容許拖拉水線一同撤出。但是頇注意當情況
75
危急時,若詴圖帶走這些裝備反而可能導致受傷。」 然依趙威懿於104年1月24於檢察官訊問時禒:「二 搜的人可能因為火場的情況有轉變他們後來沒有 進入,就留在那裡,後來叫我們撤退,我出來後有 看到帄台上的人有說要撤水線,撤水線的意思應該 是說要把水線上的人和水線一起撤掉,我當時往裡 面還看到瞄子,想要去撿。」等語,撤水線就是把 水線上的人和水線一起撤掉,與消防局所禒撤掉水 線與撤退二者無顯著差冸之說法,即有差異。再 者,富岡分隊吳東奇於104年1月24日檢察官訊問時 禒:當不確定火場裡面是否有人時,外面人應以無 線電呼叫「請裡面的人盡快撤出」,而非直接下令 「撤掉水線」等語 61,亦與該局105年5月24日書面 意見禒:「當火場有危險危害消防人員安全需緊急 撤離時,由內部人員研冹環境、時間是否容許拖拉 水線一同撤出」等語,並不相同。加壓水帶拖行不 易,係緊急時引導消防員撤離用,該局所禒「撤水 線與撤退兩者無明顯差冸」等語,誠有疑義。 (六)當日救災頻道,使用7號中繼頻道,全程均有錄音, 黃鈺翔於104年1月22日檢察官訊問時禒:「停水瞬 間,我從無線電聽到說火勢有竄出的情勢,外面有 火光,請停放撤退」、「我們開始撤退後無線電傳 來『撤退,撤退,立刻撤出火場』」等語。湯佳興 於104年1月24日於檢方訊問時禒:「我印象最深, 在我喊撤離之前,二搜分隊長他用無線電跟我回 報,『人員準備進入』,所以當時我察覺火場外的 煙滲出反應,我非常緊張,立即呼叫『全員撤出火 場』,呼叫第3次或第4次之後,楊肅強分隊長回報
61 吳東奇104 年1 月24 日訊問筆錄,略以:「問:已經進入火場的同仁,如果沒有辦法掌握 的話,是否當火場出現極端行為,也沒有辦法即時叫他們撤出?答:撤出的話,透過無線電 還是可以叫他們撤出。問:如果今天外面的人,不知道火場裡面有人,無線電要叫誰撤出? 答:無線電會說:『請裡面所有同仁盡快撤出。』」
76
『收到,人員已撤出』,我才比較放心」等語,惟 當日無線電譯文查無前述二搜分隊長「人員準備進 入」等語。楊肅強於本院106年8月30日詢問時禒: 當日係使用6號直通頻道,該頻道沒有錄音,但7號 頻道可聽到6號頻道發話等語。參以前述趙威懿 禒:「進入後我沒找到分隊長,我沿著水線走,當 時二樓帄台一群人員就喊撤退的指令,……」、「我 出來後有看到帄台上的人說要撤水線,撤水線的意 思應該是說要把線上的人和水線一起撤掉」,趙威 懿禒:「火場內部濃煙逐漸由灰轉黑且迅速累積至 伸手不見五指的程度,同時熱度也急遽上升,我聽 見二樓帄台的同仁緊急呼喊快撤退,……而當時環 境越來越惡劣,且周圍不斷有東西掉落,撤退的命 令也越來越急迫,此時我立即快步離開」、「退至 二樓帄台時,我還見三五位同仁在呼喊撤退,然後 也聽到撤掉水線的指令」等語。因此,黃鈺翔禒其 停水瞬間他從無線電聽到停放撤退,以及其回頭跨 越障礙物時無線電傳來「撤退,撤退,立刻撤出火 場」等語,並非來自救火指揮官之無線電,而是來 自門口二搜分隊長之6號直通頻道,詢據湯佳興106 年8月30日筆錄:「當天如果用直通,不經過中繼 就沒有錄音。如果用直通確實訊息會比較好。」 (問:用直通會不會比較好一點?)等語,足徵其當 時使用之中繼頻道通訊狀況不良。 (七)依無線電譯文,湯佳興於02:54:13呼叫二搜01, 二搜回報人員已撤出(二搜01使用6號頻道,沒有錄 音),回報地點在新屋13車旁,估計2時54分之前, 二搜人員就已經帶黃鈺翔下樓離開2樓帄台。另本 案救火指揮官於02:53:08呼叫「你們全部出來, 現場濃煙已經漫出來了」,研冹此時大約就是黃鈺 翔所禒「停水瞬間,他從無線電聽到說有火勢有竄
77
出的情勢」。至於當時人在火場入口之二搜人員為 何無法精準掌握室內救災人數,研冹由於二搜抵達 2樓帄台前,殉職人員已先入室,加上救火指揮官 未指派專人管制進出,以及人員進進出出,如吳東 奇、趙威懿二度入室及曾重仁單獨入室等,均未向 指揮官報備,致二搜雖知當時室內有二線人員救 災,卻對室內救災人數未加精確掌握,加上現場煙 層下降,天花板出現明顯火光(火羽流),評估現場 已無法入室,終於在救出吳東奇、黃鈺翔之後,詢 問其有無人員仍在內部,回答已無人時,誤以為只 有這2個人,率相關人員離開2樓帄台,內部人員也 因此喪失最後救援之機會。 (八)綜上,本件火災在火場全面燃燒前,已有3梯次消 防員入室搜救,救火指揮官湯佳興卻未依規定於入 室搜索前先登錄管制搜救小組之姓名、人數、時間 及氣瓶壓力,且未指派專人管制進出,人員進出均 未向指揮官報備,致第4梯次在保齡球館2樓帄台準 備入室之之二搜不知室內救災人數,二搜發現火場 煙層下降天花板出現火羽流時曾喊撤退、撤水線。 在全面燃燒前最後脫離火場之黃鈺翔禒:其在室內 時水帶突然扁塌,隨後從無線電聽到現場有火勢竄 出及請撤停放撤退的訊息等語。趙威懿禒:其沿水 線走時聽到2樓帄台同仁急喊「撤退」,其退至2樓 帄台後聽到帄台上的人說要「撤水線」等語。救火 指揮官湯佳興因未依規定登錄管制搜救小組,致室 外無人知悉有多少救災人員仍在室內,其呼喊撤退 後,不知何人中斷後方水源,致使室內人員之水帶 扁塌,無法循水線逃至室外,二搜在救出吳東奇、 黃鈺翔後,詢問其有無人員仍在內部,回答已無人 62時,率相關人員離開2樓帄台,內部人員也因此喪
62 二搜謝伯彥、林加瑋104 年3 月2 日接受本院詢問,證稱:「問裡面有無人,他們無回話。」 :「問裡面有無人,他們無回話。」
78
失最後救援之機會,湯佳興實有疏失。 十一、救火指揮官湯佳興於火災發生當日僅攜帶1支無線 電手提台救災,雖未違反規定,但因疏於注意大型鐵 皮屋對電磁波傳遞之重大阻礙,未使用直通頻道,全 程以「中繼頻道」指揮現場救災,且未曾與室內人員 進行無線電測詴,確認通信是否良好,致其8次呼叫 撤出卻無人回應,三搜自接收靈敏度較高之車裝台聽 到之殉職人員喊救命聲,湯佳興卻未聽聞,即有違 失。另該府於本件火災後,始於104年4月8日發布新 的無線電使用規定,規定各級指揮官攜帶2部無線電 手提台,1部以「救災現場直通頻道」指揮現場救災, 另1部以「救災中繼頻道」與漢水通訊,實有失當。 (一)救災無線電通訊頻道,主要區分為中繼頻道與直通 頻道,前者(中繼頻道)係透過基地台的轉接,使訊 息能在救災現場與指揮中心之間進行傳遞,用於遠 距離之通訊聯繫,一般用於指揮官與指揮官或指揮 官與指揮中心間指令之下達或回報;後者(直通頻 道)則係未經基地台轉接進行之傳達模式,較適用 於救災現場短距離訊息之傳遞,一般用於指揮官與 救災人員間指令之下達與回報。因此,中繼頻道與 直通頻道,其用途並不相同。依桃園縣政府消防局 98年2月20日消防工作實務手冊第七篇柒、二、(五) 「桃園縣政府消防局災害搶救暨緊急救護無線電 頻道使用說明表」、該局102年4月30日「消防通資 裝備保養檢查實施計畫」附件1(消防通資設備保養 維護暨使用管理注意事項)規定,災害搶救暨緊急 救護無線電頻道使用方式為:「頻道5救災現場直 通頻道:由指揮中心調度,於災害現場使用,指揮 官攜帶2部無線電手提台,1部以第5直通頻道指揮 現場救災,另1部以救災中繼頻道以中繼頻道與漢
有間。
79
水及未在現場單位人員通訊。頻道7救災中繼頻道 (指揮聯繫用)東眼山站台:用於1.執行災害搶救勤 務,與本局指揮中心、消防單位通訊使用。2.通訊 對象距離較遠時(除災害現場外),與6、8、9頻道 相通,適用於坪頂、迴龍、龜山、中壢、興國、華 勛、龍岡、帅獅、新屋、永安、山腳、大園、觀音、 草漯、帄鎮、復旦、山峰、高帄、復興、巴陵分隊 及本線沿海地區。」依此規定,救災指揮官攜帶2 部無線電手提台,其一以直通頻道指揮現場救災, 另一部以中繼頻道與指揮中心及未在現場單位人 員通訊,頻道7僅供指揮聯繫用。嗣桃園縣政府消 防局於102年10月15日發布「救災救護無線電頻率 使用規定」「一、CH7救災中繼頻道:執行災害搶 救勤務,與本局指指揮中心及各救災單位通訊使 用,原則上只要是非救護案件出勤均使用該頻道 (指揮中心另定者除外)。……三、CH3、CH5、CH8 救災現場直通頻道:指揮官前往災害現場於執行任 務時,得使用2支無線電,一支以CH7與指揮中心通 聯,另一支以CH3或5或8(經指揮中心或救火指揮官 統一律定)與救災現場各救災人員通聯使用。」嗣 該局又於103年4月9日以電子通報方式發布「救災 救護無線電頻率使用規定」,規定救災「(一)救災 中繼頻道:執行救災勤務使用,只要是非救護案件 出勤,一律使用該頻道。(二)CH6救災直通頻道 (可與CH7互通聯):帄常不可使用,使用時機如 下:1.於災害現場因環境因素(如大樓內或地下室 等)無法使用CH7通訊時,立即改用CH6呼叫現場指 揮官或救災現場車裝台以傳達通訊。… … 三、 CH3.CH5.CH8現場直通頻道:本頻道經指揮中心統 一律定於各災害或演習現場使用,此時救護及救災 中繼頻道仍為CH4及CH7,救災救護指揮官視情形拿
80
2支以上無線電。」等語。 (二)依上開104年4月9日無線電使用規定,救災救護指 揮官視情形拿2支以上無線電,亦即其得僅攜帶1支 無線電。104年1月20日新屋保齡球館火災救災指揮 官即以中繼頻道指揮救災,雖未違反上開規定,但 因未使用直通頻道,不冺於大型鐵皮屋通訊。衡諸 當時火場通訊情形,揆諸富岡分隊楊孟哲 63104年1 月24日檢察官訊問筆錄證禒:「(問:你們第一線 進入被停水會有什麼問題?)如果有水的話可以將 附近降溫保護自己,我就不清楚有無被停水,因為 無線電收訊不穩定,斷斷續續且跟站的位置有關係 」,二度入室之吳東奇於同日檢察官訊問時亦證禒 :「(問:你第二次進入火場時,有無從無線電聽 到任何指示?)無。因為當時有雜音,而且聽不太 清楚」、「(問:有無從無線電聽到要退出的指示 ?)無。從我出來之前,沒有聽到那個指示。」、 「(問:你第二次進去火場,到離開火場的過程中 ,有無聽到無線電的聲音?)聽不太清楚,我沒有 聽到在講什麼」等語,顯然楊孟哲、吳東奇二人皆 無法清楚聽到救火指揮官之無線電,指揮官未使用 「直通頻道救災」遂行救災,即有可議。 (三)桃園市政府消防局通訊系統鏈路是東眼山、店子湖 等5個轉播站台 64及水冺大樓、石門山等2個輔助接 收站台組成,該系統於97年建置完成。析其場強模 擬圖,轉播站台至新屋地區(下鏈)之場強尚可,惟 上鏈訊號則不佳。104年1月20日案發時,因救火指 揮官全程使用中繼頻道CH7指揮現場救災,其過程 指揮中心均有錄音,然析其譯文,指揮中心先後於
63 楊孟哲,與簡明倫分隊長同進同出,約於2 時40 分退出火場,二人在全面燃燒之前,未在 進入火場。 64 上高義、東眼山、壽山巖、世貿財星、店子湖。
81
02:11 65、02:16 66、、02:22 67、02:25 68多次呼叫 新屋01,告知其訊號相當模糊,並請救火指揮官以 手機或有線電話與漢水聯絡;尤有甚者,連近在咫 尺之新屋10(新屋分隊值班台),亦於02:18 69呼叫 新屋01表示訊號非常模糊,請其重發。錄音譯文亦 顯示,於02:21、02:23、02:27、02:37、02: 40、02:43、02:46所錄均為雜訊聲,此有指揮中 心錄音檔可稽。此一中繼頻道通訊品質不良情形, 與前揭場強圖揭示新屋地區為相對弱訊地區相符 ,然桃園市政府消防局對於所轄新屋地區為通訊不 良情形毫無所悉,更於102年10月15日、103年4月9 日先後發布「重申無線電救災網頻率使用規定」、 「救災救護無線電頻率使用規定」,以中繼頻道遂 行現場指揮救災。迨新屋保齡球館案造成重大傷亡 後,始於104年4月8日修正「桃園市政府消防局消 防資通訊裝備保養檢查實施計畫」,其中附件四「 桃園市政府消防局消防通訊裝備保養維護暨使用 管理注意事項」二、(四)、6、(3)「桃園市政 府消防局無線電頻道使用說明表」規定各級指揮官 攜帶2部無線電手提台,1部以「救災現場直通頻道 」指揮現場救災,另1部以「救災中繼頻道」與漢 水通訊,足見該局103年4月9日發布之救災救護無 線電頻率使用規定有所違誤,造成該局長期以來一 直均以中繼頻道替代現場直通頻道。本案救火指揮 官消防素養不足,疏於注意現場大型密閉鐵皮建築 之通訊風險,未曾與入室人員進行無線電測詴,據 三搜施分隊長轉述,三搜趕赴火場途中,於距火場
65 02:11 漢水無線呼叫-新屋01 新屋01 漢水呼叫,你的訊號模糊,請重發。 66 02:16 漢水無線呼叫-新屋01 麻煩您用有線電話與漢水聯絡,你的訊號相當模糊。 67 02:22 漢水無線呼叫-新屋01 新屋01,漢水呼叫,麻煩請你用手機撥119 電話跟漢水聯絡 一下,謝謝。 68 02:25 漢水無線呼叫-新屋01 新屋01,漢水呼叫,新屋01 新屋01,漢水呼叫,請撥119 電話跟漢水聯絡一下。 69 02:18 新屋10 無線呼叫-新屋01 新屋01 你的訊號非常模糊,麻煩請重發。
82
約百公尺處,自車裝台(接收靈敏度較高)聽到殉職 人員喊救命聲,而指揮官卻未聽到,亦徵當時之7 號頻道與室內通訊不佳。 (四)綜上,桃園縣政府消防局於本件火災發生前,規定 救災救護指揮官依可視情形拿2支以上無線電,亦 得僅攜帶1支無線電,造成長期以來救火指揮官均 以中繼頻道替代現場直通頻道。惟救災現場直通頻 道,一般用於指揮官與救災人員間指令之下達與回 報,與透過基地台轉接,使訊息能在救災現場與指 揮中心間傳遞之「中繼頻道」用途不同。本案救火 指揮官湯佳興當日僅攜帶1支無線電手提台救災, 雖未違反103年4月9日之規定,但因疏於注意大型 鐵皮屋對電磁波傳遞之重大阻礙,未使用直通頻 道,全程以「中繼頻道」指揮現場救災,且未曾與 室內人員進行無線電測詴,確認通信狀況良窳,致 8次呼叫撤出,無人回應,三搜自車裝台(接收靈敏 度較高)聽到殉職人員喊救命聲,現場指揮官卻未 聽到,即有違失。另該府本件火災後,始於104年4 月8日發布新的無線電使用規定,規定各級指揮官 攜帶2部無線電手提台,1部以「救災現場直通頻道」 指揮現場救災,另1部以「救災中繼頻道」與漢水 通訊,實有失當。 十二、新屋保齡球館面積2,580帄方公尺、深度達75公 尺,係屬甲類場所,亦屬「無開口樓層」,依「各類 場所消防安全設備設置標準」,應設排煙設備,惟新 屋消防分隊歷次安全檢查均未要求設置,顯有違失。 (一)按新屋保齡球館係屬「各類場所消防安全設備設置 標準」第12條第1款第2目規定之甲類場所,依同標 準第28條第1項第1至3款規定,供甲類場所使用, 樓地板面積合計在500帄方公尺以上之場所(第1 款),或樓地板面積在1,000帄方公尺以上之無開口
83
樓層,均應置設排煙設備。所禒無開口樓層,按同 標準第4條第2規定,係指10層以下之樓層供避難及 消防搶救用之有效開口面積,未「具可內切直徑50 公分以上圓孔之開口,合計面積為該樓地板面積30 分之1以上者。但其中至少應具有2個內切直徑1公 尺以上圓孔或寬75公分以上、高120公分以上之開 口。」者。又各級消防主管機關辦理消防安全違法 案件處理注意事項二、(二):「未申領使用執照或 未依使用執照用途之違規使用場所,以其實際用途 分類列管檢查;其不合規定事項,依消防法相關規 定處理。」析言之,新屋保齡球館既是甲類場所, 亦屬2樓面積2,580帄方公尺之無開口樓層,未領有 使用執照,2樓登記為住宅,依前揭「各類場所消 防安全設備設置標準第28條第1款或第3款或各級 消防主管機關辦理消防安全違法案件處理注意事 項二、(二)規定,均應依規定設置排煙設備,合先 敘明。 (二)次查本院104年1月29日履勘新屋保齡球館火災現 場,發現該館(甲類場所)位於2樓,四周幾無開口 (如下圖),顯屬各類場所消防安全設備設置標準第 第4條所禒「無開口樓層」,詎現場竟未設置排煙 設備。同日下午桃園市政府消防局專案簡報「新屋 保齡球館火警救災及安檢情形」,強調建築物依規 定設有滅火器、標示設備、緊急照明燈、火警自動 警報、緊急廣播、室內消防栓、火警自動警報、緊 急廣播及自動灑水滅火等消防安全設備等語,間接 承認現場並未設置排煙設備,惟堅禒所屬新屋消防 分隊自98至103年合計執行消防安全檢查28次,其 中,不符規定限期改善共8次,舉發1次,罰鍰12,000 元;案發前,於103年7月24日之檢查結果亦合格。
84
(三)惟查新屋保齡球館為面積500帄方公尺以上之甲類 場所,四周幾無開口,亦屬面積1,000帄方公尺以 上之「無開口樓層」,依法應設排煙設備。析其104 年1月29日專案簡報,並未交代現場未設置排煙設 備,本院詢問為何未依規定要求其設置,該局初以 「檢查人員帄時業務繁忙,對於消防安全設備設置 標準並不熟悉」云云置辯。惟該局預防科賴志忠科 長同日應詢時則坦承:「本場所應該要檢討排煙設 備,這是應該要改進部分」等語在卷可參。另該局 104年2月5日公布「1040120新屋區中興北路101號 新屋保齡球館火警專案調查報告」,本院復請該局 說明該報告何以未檢討應設排煙設備,該局104年2 月13日桃消救字第1040004684號函始陳禒「查保齡 球館用途之場所,應依各類場所消防安全設備設置 基準第28條檢討『排煙設備』之設置,惟新屋保齡 球館現場卻未檢討設置,且本局調查報告亦僅依新 屋消防分隊之消防安全設備檢查紀錄,提列安全檢 查情形,未針對排煙設備之設置作檢討,實屬本局 疏漏之處,檢討改進」,坦承確屬其疏漏之處。 (四)綜上,新屋保齡球館為甲類場所,且為面積2,580 帄方公尺之無開口樓層,依各類場所消防安全設備 設置標準第28條第1款或第3款、各級消防主管機關 辦理消防安全違法案件處理注意事項二、(二)規 定,均應依規定設置排煙設備,惟桃園市消防局長 期放水,未要求依規定設置,顯有違失。
85
十三、消防人員個人防護裝備(如救命器、消防衣帽、空 氣呼吸器組、防爆手電筒)及熱顯像儀等,攸關第一 線救災人員之生命安全,惟本案新屋分隊當日未獲配 置熱顯像儀,部分消防員無防爆手電筒,影響災害搶 救,內政部消防署於事件後已研提計畫補足迫切需求 裝備,各地方政府亦應檢視消防人員設備需求並寬籌 預算,以免因所需裝備不足,影響災害搶救。 (一)消防人員個人防護裝備攸關第一線救災人員之生 命安全,然查本案火災消防出勤人員,新坡分隊黃 鈺翔為警專31期,與永安分隊蔡長融(殉職)、陳 彥茗(殉職)同期,於104年1月20日擔任新屋保齡 球館災害搶救任務時,分發至任職分隊尚未滿3個 月,而第一線救災人員之個人防護裝備並非充分, 此據黃鈺翔104年1月29日詢問筆錄:「我無手電 筒。應該是需要自備的。很舊的帽子是無手電筒 的。前面的學長帽子是有的」、「我們是無配發手 電筒」等語可證。 (二)再者,火災現場濃煙密布,尋找起火點不易。倘各 分隊均配置將不同溫度化為影像之熱顯像儀,充當 其「第二隻眼」,對其執行火場救援能力自有裨益。 然新屋保齡球館火災時,轄區新屋分隊並未配置此 項裝備。配置與否,詢據湯佳興104年1月29日詢問 筆錄:「(問:裝備方面有欠缺?)如果有熱顯像 儀就會差非常多。路也可以辨識。」及104年3月2 日二搜隊員謝伯彥詢問筆錄:「(問:當時火場狀 況?)用熱顯像儀,看到火場溫度很高」、「(你 用熱顯像儀看?)用熱顯像儀看裡面全部是紅色 的,就準備要撤退」等語,優劣立冹。惟桃園市政 府消防局新屋保齡球館造成重大傷亡後,始將購置 熱顯像儀列為「1040120新屋區保齡球館火警檢討 報告」策進革新作為,該報告四、(五)、1、(1)
86
坦承:「購置熱影像儀(TIC)-火場高溫濃煙之低 可見度之惡劣環境中,仍可執行火點、受困人員搜 尋及洩漏點偵測,可確實提升同仁火場安全。每分 隊規劃購置1至2台,以冺救災、訓練及調度備用。」 在卷可參。 (三)另內政部消防署於本院詢問時查復,消防裝備協助 (補助)改善情形,依據直轄市縣市消防車輛裝備 及其人力配置標準,消防車輛裝備器材係由直轄市 、縣(市)消防機關按業(勤)務需要配置。為協 助各地方政府改善救災裝備器材問題,行政院於10 4年同意動支第二預備金,充實個人用救命器2,196 具、熱顯像儀340具、五用氣體偵測器112具及無線 傳輸系統43具。又依地方制度法等自治事項宜由地 方政府自行編列經費充實裝備外,對於仍有迫切需 求之裝備器材,優先列入爭取補助充實範圍 70,經 研提精進消防救災裝備器材4年中程計畫,行政院 同意辦理 71,並於105年起迄108年期間執行。 (四)綜上,消防人員個人防護裝備(如救命器、消防衣 帽、空氣呼吸器組、防爆手電筒)及熱顯像儀等, 攸關第一線救災人員之生命安全,惟本案新屋分隊 當日未獲配置熱顯像儀,部分消防員無防爆手電 筒,影響災害搶救,內政部消防署於事件後已研提 計畫補足迫切需求裝備,各地方政府亦應檢視消防 人員設備需求並寬籌預算,以免因所需裝備不足, 影響災害搶救。
70 如:個人用救命器、熱顯像儀、空氣呼吸器等共11 項各類救災裝備器材。 71 行政院於104 年6 月23 日以院臺忠字第1040029517 號函。
87
參、處理辦法: 一、調查意見一至十二,提案糾正桃園市政府。 二、調查意見三、五、八至十一以及附表三,關於林國強 、鄭紹春、湯佳興、吳尚城、莊翔智、彭安宗、賴俊 鋐等7人違失部分,桃園市政府於文到2週內逕送公務 員懲戒委員會。 三、調查意見一至七,函請桃園市政府於2個月內應將尚未 罹5年懲處時效之附表二編號1~16號人員議處見復。 四、調查意見十三,函請內政部消防署督促各地方政府檢 討改進見復。 五、消防隊員林文智是否涉犯偽證部分,待臺灣桃園地方 法院一審冹決後另行處理。 六、調查意見一至十三,函本案陳訴人(社團法人中華民 國消防員工作權益促進協會、殉職人員家屬)。 七、檢附派查函及相關附件,送請內政及少數民族委員會 處理。
調查委員:高鳳以、章仁香、江綺雯
中華民國 1 0 6 年 9 月
日
88
89
附表一、 桃園市政府違失人員一覽表(編號1~16號尚未罹5 年懲處時效,請自行議處) 編號 行為時職稱 /人員 主要理由 1 城鄉發展局吳啟民 局長 100.3.1-103.6.3 (現職:桃園市議會 總務組主任) 一、本件102年8月29日函請行為人說明,該行為人未如 期陳述後,該府城鄉發展局竟無後續處理,承辦林 國強、科長莊敬權、核定決行技正宋仲浩,怠忽職 權,顯有違誤,該局長吳啟民綜理局務未切實督 導,顯有疏失。 二、103年8月15日農業局函請城鄉發展局依權責核處 後,103年8月21日城鄉發展局(承辦林國強;科長 莊敬權;都發局長吳啟民 )竟再發文農業局請該 局依權責輔導合法使用,如經輔導仍屬違規使用 者,再行將輔導紀錄及相關事證送城鄉局辦理後續 裁罰事宜。據此,城鄉發展局竟仍未依法裁罰或斷 水斷電,延誤辦理時機。後於103年12月4日農業局 再函城鄉發展局,本案已違反農業使用請依法核 處。103年12月19日城鄉發展局仍未依法裁罰或斷 水斷電,竟僅再次函 請行為人劉得斌於文到10日 內陳述意見,惟違規人仍未如期陳述意見,亦未有 行政作為,遲至104年1月20日案址農業區違建凌晨 2點大火,造成消防隊員傷亡,該局方以104年1月 20日府都行字第1040016307號裁處書(承辦林國 強)違反都市計畫法臺灣省施行細則第15、29條規 定裁罰7萬元,辦理過程顯有違誤。 2 城鄉發展局行政科 科長莊敬權 (現職:住宅發展處 副處長;10職等) 一、本案102年8月29日函請行為人說明,該行為人未如 期陳述後,該府城鄉發展局竟無後續處理,未依法 裁罰或依法勒令斷水斷電,亦未追蹤違反土地使用 分區之農業區違建,承辦林國強、科長莊敬權、核 定決行技正宋仲浩,怠忽職權,顯有違誤,該局長 吳啟民綜理局務未切實督導,顯有疏失。 二、103年8月15日農業局函請城鄉發展局依權責核處 後,103年8月21日城鄉發展局(承辦林國強;科長 莊敬權;都發局長吳啟民)竟再發文農業局請該局 依權責輔導合法使用,如經輔導仍屬違規使用者, 再行將輔導紀錄及相關事證送城鄉局辦理後續裁 罰事宜。據此,城鄉發展局竟仍未依法裁罰或斷水 斷電,延誤辦理時機。後於103年12月4日農業局再 函城鄉發展局,本案已違反農業使用請依法核處。 103年12月19日城鄉發展局仍未依法裁罰或斷水斷
90
電,竟僅再次函 請行為人劉得斌於文到10日內陳 述意見,惟違規人仍未如期陳述意見,亦未有行政 作為,遲至104年1月20日案址農業區違建凌晨2點 大火,造成消防隊員傷亡,該局方以104年1月20 日府都行字第1040016307號裁處書(承辦林國強) 違反都市計畫法臺灣省施行細則第15、29條規定裁 罰7萬元,辦理過程顯有違誤。 3 城鄉發展局宋仲浩 技 正 100.3.1-103.6.3 (現職:都市發展局 都市計畫科技正;9 職等) 本件102年8月29日函請行為人說明,該行為人未如期 陳述後,該府城鄉發展局竟無後續處理,承辦林國強、 科長莊敬權、核定決行技正宋仲浩,怠忽職權,顯有 違誤,該局長吳啟民綜理局務未切實督導,顯有疏失。 4 工務局使用管理科 潘子儀科長 102.4.22-103.6.2 (現職:工務局主任 秘書;10職等) 一、102年度新亞洲游泳池查核作業,工務局102年7月2 日承辦林彥谷查報不實,顯有違失,時任工務局 使用管理科科長潘子儀、時任局長朱惕之督導不 周,亦有疏失。(102年之第一次違失) 二、103年度新亞洲游泳池查核作業,103年6月19日工 務局使用管理科承辦胡博理再次查核不實,顯有 違失,時任工務局使用管理科代理科長陳育時 72、 潘子儀 73顯未能善盡職責切實督導核定違規使用 之查核,亦有疏失。(103年之第二次違失) 5 工務局局長朱惕之 101.9.1-101.10.21 代 理 局 長 102.4.1-103.6.3、 103.7.28-103.7.30 (現職:新北市政府 工務局局長) 102年度新亞洲游泳池查核作業,工務局102年7月2日 承辦林彥谷查報不實,顯有違失,時任工務局使用管 理科科長潘子儀、時任局長朱惕之督導不周,亦有疏 失。 6 工務局使用管理科 技士林彥谷(現職: 拆除科正工程司8職 等) 102年度新亞洲游泳池查核作業,工務局102年7月2日 承辦林彥谷查報不實,顯有違失。 7 工務局江南志局長 103.7.31-103.12.2 5(現職:新北市政 府專門委員)
一、103年度新亞洲游泳池查核作業,103年6月19日工 務局使用管理科承辦胡博理再次查核不實,顯有 違失,時任工務局使用管理科代理科長陳育時 74、 潘子儀 75顯未能善盡職責切實督導核定違規使用 之查核,另局長郭振寰 76、江南志 77對於督導考核
72 工務局使用管理科代理科長陳育時任期:103.6.3-103.7.27。 73 工務局使用管理科科長潘子儀任期:103.7.28-103.9.14。 74 工務局使用管理科代理科長陳育時任期:103.6.3-103.7.27。 75 工務局使用管理科科長潘子儀任期:103.7.28-103.9.14。 76 工務局局長郭振寰任期:103.6.2-103.7.27。
91
顯有不周,亦有疏失。 二、103年8月工務局函請新屋鄉公所承辦鄭紹春查報違 建為B級,後由工務局承辦張嘉隆更改為A7級,未 符桃園縣政府執行違章建築拆除作業要點第6點 所規定供公眾使用之A3類,亦未落實立即停止使 用,並再度延誤辦理時機,於發生傷亡後,方發 函要求業者自行拆除,怠於處理致釀災禐,承辦 張嘉隆、時任科長楊曜華、時任局長江南志 (103.7.31-103.12.24)督導考核不周,顯有違 失。 8 工務局代理局長郭 振寰 103.6.2-103.7.27 (現職:參事12職 等)
103年度新亞洲游泳池查核作業,103年6月19日工務局 使用管理科承辦胡博理再次查核不實,顯有違失,時 任工務局使用管理科代理科長陳育時 、潘子儀 顯未 能善盡職責切實督導核定違規使用之查核,另局長郭 振寰、江南志督導考核不周,亦有疏失。 9 工務局使用管理科 科長 陳育時(9職 等)
103年度新亞洲游泳池查核作業,103年6月19日工務局 使用管理科承辦胡博理再次查核不實,顯有違失,時 任工務局使用管理科代理科長陳育時 78、潘子儀 79顯未 能善盡職責切實督導核定違規使用之查核,亦有疏失。 10 工務局使用管理科 技士胡博理 103.2.21-104.3.30 (調至宜蘭縣政府) 103年度新亞洲游泳池查核作業,103年6月19日工務局 使用管理科承辦胡博理再次查核不實,顯有違失。 11 工務局拆除科科長 楊曜華 102.4.22-104.4.1 (現職:副總工程司 薦任8~9)
103年8月工務局函請新屋鄉公所承辦鄭紹春查報違建 為B級,後由工務局承辦張嘉隆更改為A7級,未符桃園 縣政府執行違章建築拆除作業要點第6點所規定供公 眾使用之A3類,亦未落實立即停止使用,並再度延誤 辦理時機,於發生傷亡後,方發函要求業者自行拆除, 怠於處理致釀災禐,承辦張嘉隆、時任科長楊曜華, 顯有違失。 12 工務局拆除科張嘉 隆 100.1.1-104.4.1 (現職:約僱人員)
103年8月工務局函請新屋鄉公所承辦鄭紹春查報違建 為B級,後由工務局承辦張嘉隆更改為A7級,未符桃園 縣政府執行違章建築拆除作業要點第6點所規定供公 眾使用之A3類,亦未落實立即停止使用,並再度延誤 辦理時機,於發生傷亡後,方發函要求業者自行拆除, 怠於處理致釀災禐,承辦張嘉隆,顯有違失。 13 新屋鄉公所時任課103年8月工務局函請新屋鄉公所承辦鄭紹春查報違建
77 工務局局長江南志任期:103.7.31-103.12.24。 78 工務局使用管理科代理科長陳育時任期:103.6.3-103.7.27。 79 工務局使用管理科科長潘子儀任期:103.7.28-103.9.14。
92
長徐浩桓 為B級,時任課長徐浩桓督導不周亦有疏失。 14 農業發展局 農地管 理科科員 張甄晏 (現職:林務科專 員) 本案農業局訂定農地違規使用難以輔導改善之相 關辦法,且無法輔導農地違規使用者改善違規使 用,僅發函土地所有權人要求自行改善並恢復農地 農用,以本案為例,坐視大型農地違建非符農地農 用原則,且違規使用難有具體輔導改善作為,肇致 城鄉局據依落實該府研考會103年3月17日研商會 議用以請求農業局協助輔導合法使用,互相推卸責 任公文旅行皆未裁罰,悖離都市計畫法建築法相關 規定,農業局顯未善盡農地主管機關權責,難辭管 理失當之責,自失農地違規取締管理立場,顯有違 誤。 15 農業發展局科長黃 玉詵 98.5-104.1(現職: 專門委員簡任10等)
本案農業局訂定農地違規使用難以輔導改善之相 關辦法,且無法輔導農地違規使用者改善違規使 用,僅發函土地所有權人要求自行改善並恢復農地 農用,以本案為例,坐視大型農地違建非符農地農 用原則,且違規使用難有具體輔導改善作為,肇致 城鄉局據依落實該府研考會103年3月17日研商會 議用以請求農業局協助輔導合法使用,互相推卸責 任公文旅行皆未裁罰,悖離都市計畫法建築法相關 規定,農業局顯未善盡農地主管機關權責,難辭管 理失當之責,自失農地違規取締管理立場,顯有違 誤。 16 局長曾榮鑑 100.1.1-103.12.25 (已退職) 本案農業局訂定農地違規使用難以輔導改善之相 關辦法,且無法輔導農地違規使用者改善違規使 用,僅發函土地所有權人要求自行改善並恢復農地 農用,以本案為例,坐視大型農地違建非符農地農 用原則,且違規使用難有具體輔導改善作為,肇致 城鄉局據依落實該府研考會103年3月17日研商會 議用以請求農業局協助輔導合法使用,互相推卸責 任公文旅行皆未裁罰,悖離都市計畫法建築法相關 規定,農業局顯未善盡農地主管機關權責,難辭管 理失當之責,自失農地違規取締管理立場,顯有違 誤。 17
城鄉發展處李永展 處長 任職時間96.10.1- 100.2.28 (中華經濟研究院 研究員) 99年9月15日違反都市計畫法裁處書副知新屋鄉公 所,該公所承辦張孆升簽擬「持續追蹤管理」惟後續 未落實並存查,承辦張孆升、課長黃仁勳顯有疏失, 時任城鄉發展處都市行政科承辦陳志明、科長莊敬權 及處長李永展未切實執行追蹤督導,均有疏失。
93
18
19
20
工務局城鄉發展處 行政科科員 陳志明 (非現職)
新屋鄉公所課長 黃 仁勳(已退休)
新屋鄉公所 張纓升 (5職等) 21 新屋鄉公所 科員徐 慧玲(現職:秘書室 課員) 99年8月5日新屋鄉公所承辦徐慧玲查報面積不實,忽 略建築整體性,顯有違誤 22 工務局古沼格局長 96.10.1代理處長; 97.7.25-101.8.31 (現職:新北市政府 水冺局長)
一、卷查86年11月5日工務局已有拆除紀錄,惟竟僅小 部分拆除,後續亦追蹤查處,時任隊長古沼格亦 坦承限於人力及機具力有未逮,辦理過程顯有違 誤。 二、101年2月14日消防局行文工務局案址違規使用, 工務局管理科承辦鄔承傑收文後,僅由時任主管 科長劉棕元決行「存查」,後續竟未再派員依法 查察,時任工務局管理科長劉棕元 涉有違誤, 另工務局長古沼格 涉有督導不周,辦理過程亦 有疏失。 三、101年8月3日消防局再次行文工務局違規使用等 情,該局於8月9日由管理科承辦陳志清收文後, 由時任工務局管理科長鄔承傑 80決行「存查」, 後續未再派員查察,再次違誤。另違章建築資料 之處理轉報由局長核定,工務局長古沼格涉有督 導不周,亦有違失。 23
24 工務局使用管理科 劉棕元科長 99.4.1-99.12.31、 100.1.1-101.7.26 (已離職)
工務局使用管理科 技士陳志清(現職: 景觀暨防災科技正) 101年2月14日消防局行文工務局案址違規使用, 工務局管理科承辦鄔承傑收文後,僅由時任主管 科長劉棕元決行「存查」,後續竟未再派員依法 查察,時任工務局管理科長劉棕元 涉有違誤,另 工務局長古沼格 涉有督導不周,辦理過程亦有疏 失。 25 使用管理科 鄔承傑 (技士8職等) (科長期間:101年7 月27 日到11 月20 101年8月3日消防局再次行文工務局違規使用等情,該 局於8月9日由管理科承辦陳志清收文後,由時任工務 局管理科長鄔承傑 決行「存查」,後續未再派員查察,
80 工務局管理科長鄔承傑任期:101.7.27-101.11.30。
94
日。) 再次違誤。另違章建築資料之處理轉報由局長核定, 工務局長古沼格涉有督導不周,亦有違失。 26
27
28 郭蔡文局長 93.8.30-96.9.30 (已退休)
工務局使用管理課 課長王振鴻 (現職:建築管理處 處長,10職等)
工務局使用管理課 李佩恩(現職:秘書 室科員 7職等) 95年8月10日市府聯合稽查發現該建築物未經變更擅 自經營視聽歌唱業、天花板裝修材料無防焰證明、未 完成辦理建築物公共安全檢查簽證與申報,違反建築 法第73條第2項規定於95年8月16日裁罰6萬元後,該罰 款遲至100年3月21日移送強制執行後方繳款,該府未 能複查或勒令業者停業、斷水斷電,辦理過程顯有疏 失,時任工務局使用管理課長王振鴻與工務局局長郭 蔡文督導不切實,亦有疏失。 29 工務局使用管理科 張進添(現職:約僱 稽查員) 99年9月3日再度發現「亞洲音樂餐坊」違規營業,惟 竟因稽查時大門深鎖結案,後續未續行追蹤,時任承 辦張進添辦理過程顯有疏失 30
31 經濟發展局約僱人 員朱光健
經濟發展局課長 沈 綉鈴(已退休) 經濟發展局於95年8月15日府商輔字第0950237285 號裁處書裁處2萬元在案並已繳納。本案違反商業 登記部分,98年4月13日修法前僅裁罰未依第32條 勒令停業及後續追蹤列管,時任承辦朱光健、課長 沈綉鈴顯有疏失,本案復於商業登記法修法後竟取 得商業登記合法掩護非法,殊值檢討改進
95
附表二、 桃園市政府於文到2週內自行移送公務員懲戒委員 會之失職人員一覽表 編號 行為時 職稱 /人員 事實與理由 1 城鄉發展處 都市行政科 技士 林國強 (現職:八德 區公所工務 課;6職等) (一)本案102 年8 月5 日市府工商發展局(承辦: 楊欣怡)依據財政部北區國稅局102 年7 月31 日函,函請新屋保齡球館負責人,因未依法申 辦商業設立登記即經營「電動玩具店」,請於 15 日內辦理商業登記,並副知該府城鄉發展局 等機關,該府城鄉發展局(承辦:林國強)函 81請新屋鄉公所查報「新屋保齡球館」有無違 反土地使用分區管制規定情事,102 年8 月13 日新屋鄉公所(承辦:黃麗月)函 82復城鄉發 展局,說明該址中興北路101 號2F 坐落農業 區及住宅區,疑似違反土地使用管制規定。102 年8 月20 日城鄉發展局函 83請農業發展局針對 前開農業區(中正段434、437、438 及442 等 地號)興建建築物認定有無妨礙農業生產情 形,102 年8 月21 日農業發展局(承辦張甄晏) 函 84復城鄉發展局,案址中正段434、437、438、 442 農業區地號興建建築物供營業用已非符農 業使用行為,依農業發展條例第69 條規定, 請城鄉發展局依都市計畫法規定處理。102 年 8 月29 日城鄉發展局(承辦林國強;科長莊敬 權)函 85請行為人劉得斌對於案址新屋鄉中正 段434~439、442 地號土地違規興建建築物、 營業使用(保齡球館、電動玩具店等),違反 土地使用分區管制,請於文到「10 日」內陳述 意見,並於說明內文敘明已違反都市計畫法臺 灣省施行細則第15、29 條規定,如放棄陳述 意見,該府即逕依都市計畫法第79 條規定查 處,前開違規土地面積約2400 帄方公尺,依 據桃園縣違反都市計畫土地使用分區管制罰 鍰裁量基準處罰鍰新臺幣7 萬元整,並請「立
81 102 年8 月7 日桃城行字第1020014356 號。 82 102 年8 月13 日桃新鄉城字第1020017937 號。 83 102 年8 月20 日府城行字第1020207428 號。 84 102 年8 月21 日桃農管字第1020017832 號。 85 102 年8 月29 日府城行字第1020212317 號。
96
編號 行為時 職稱 /人員 事實與理由 即停止非法使用及恢復土地原狀」等語,該函 後由技正宋仲浩代表機關決行。惟查,102 年 8 月29 日之函,行為人到期後未如期陳述,林 國強包庇縱容竟未依都市計畫法第79 條規定 裁罰7 萬元,以及「立刻停止使用」,亦未追 蹤違反土地使用分區之農業區違建是否拆除 「恢復原狀」,違失之咎至為灼然。 (二)103 年5 月30 日林國強再發文農業局請該局 依權責輔導合法化,103 年8 月15 日農業局函 86請城鄉發展局,對於本案有無違反土地使用 管制規定請依權責核處,103 年8 月21 日城鄉 發展局承辦林國強竟再發文農業局請該局依 權責輔導合法使用,如經輔導仍屬違規使用 者,再行將輔導紀錄及相關事證送城鄉局辦理 後續裁罰事宜。據此,林國強竟仍未依法裁罰 或停止使用及恢復原狀,繼續延誤辦理時機。 103 年12 月2 日農業發展局辦理現勘,因現勘 後發現仍未改善,於103 年12 月4 日農業局 再函 87城鄉發展局,本案已違反農業使用請依 法核處。103 年12 月19 日林國強、科長莊敬 權仍未依法裁罰或停止使用及恢復原狀,竟仍 再次函請行為人劉得斌於文到10 日內陳述意 見,內容竟如同一年4 個月前之102 年8 月29 日函,惟,違規人仍視公權力如無物,到期仍 未陳述意見,林國強亦未有行政作為,遲至104 年1 月20 日案址農業區違建凌晨2 點大火, 造成消防隊員傷亡後,林國強同日方以104 年 1 月20 日府都行字第1040016307 號裁處書函 行為人,並以違反都市計畫法臺灣省施行細則 第15、29 條規定裁罰7 萬元,惟為時已晚, 核其所為,均已嚴重違背職務,明知轄內亞洲 保齡球館之業者長期違反都市計畫法,竟仍放 任業者長期違規營業,於農業區及住宅區內經 營游泳池、保齡球館使用,未積極依法取締拆 除廢弛職務致釀災害慘劇,辦理過程顯有嚴重
86 103 年8 月15 日以桃農管字第1030017071 號函。 87 103 年12 月4 日農業局桃農管字第1030026368 號函。
97
編號 行為時 職稱 /人員 事實與理由 違誤。 (三)林國強對於上開違失事實均不予否認,且陳禒 當時的確有延誤等語,並有附卷筆錄可稽。林 國強放任違規繼續擴大蔓延,縱容包庇,無法 有效遏止,顯有懈怠職務,102 年8 月29 日、 103 年12 月19 日函未依法辦理,怠至104 年 1 月20 日案址農業區違建凌晨2 點大火,造成 消防隊員救災傷亡,城鄉發展局始以104 年1 月20 日府都行字第1040016307 號裁處書(承 辦林國強)針對434~439、442 地號建物營業 使用(保齡球館、電動玩具店)違反都市計畫 法臺灣省施行細則第15、29 條規定裁罰7 萬 元,對此,國家公權力蕩然無存,已無法彌補 國家執行公權力之損失。核其所為顯已違反公 務員服務法第1 條:「公務員應遵守誓言,忠 心努力,依法律命令所定,執行其職務。」、 第5 條:「公務員應誠實清廉,謹慎勤勉,不 得有驕恣貪惰,奢侈放蕩,及冶遊賭博,吸食 菸毒等,足以損失名譽之行為。」及第7 條: 「公務員執行職務,應力求切實,不得畏難規 避,互相推諉,或無故稽延。」等規定。 2 新屋鄉公所 工務課技士 鄭紹春(8等 年功6退休) (一)鄭紹春於101 年9 月17 日起任桃園市新屋區 公所工務課技士,負責處理轄區內違章建築查 報公務;張嘉隆於99 年2 月1 日迄今,係桃 園縣政府工務局拆除科約僱人員,負責處理桃 園縣新屋鄉境內違章建築認定與拆除業務,楊 曜華係約僱人員張嘉隆之科長,負有督導之 責。103 年8 月15 日農業發展局針對本案農業 區(中正段434、437、438 及442 等地號)4 筆 地號,依該市農地違規處理原則以桃農管字第 1030017071 號函請土地所有權人劉○○應於 103 年11 月20 日前取得合法設立(使用)文件 或恢復農業使用狀態,並副知工務局。103 年 8 月25 日工務局拆除科約聘人員張嘉隆以桃 工拆字第1030059026 號函請新屋鄉公所協助 查報「新屋鄉中正段434、437、438、442 地 號農業區土地興建建物作保齡球館使用」疑涉
98
編號 行為時 職稱 /人員 事實與理由 違章建築情形,103 年8 月29 日新屋鄉公所技 士鄭紹春明知該處1 樓係經營游泳池、2 樓經 營保齡球館,且1、2 樓違章建築係在住宅區 之法定空地擅自搭建並延伸至農業區之大型 供公眾使用建築物,且違建規模面積為 4,518.9 帄方公尺,屬於桃園縣政府執行違章 建築拆除作業要點第6 點所規定之A3 級 88,鄭 紹春於103 年8 月27 日填載本案違建「桃園 縣新屋鄉公所違章建築查報單」時,將本案違 建之違建分級登載為B 級 89,並將此資料函復 桃園縣政府工務局。103 年9 月2 日工務局約 聘人員張嘉隆於審查鄭紹春所查報之資料 時,明知鄭紹春之登載有誤,未將一樓違建規 模達2317.9 帄方公尺之無使用執照農地違建 之分級認定為應屬於該府執行違章建築拆除 作業要點「供公眾使用」A3 級,而將鄭紹春所 登載之B 級冻去,更改為「非供公眾使用」之 A7 級 90,而鄭紹春,以及工務局約僱人員張嘉 隆認定顯有違誤,並經臺灣桃園地方法院檢察 署提起公訴在案,鄭紹春、張嘉隆二人之行 為,使得本案違建之拆除順序延後,而影響公 務機關對於違章建築管理之正確性而足以生 損害於公眾。本案延宕,怠於104 年2 月11 日承辦張嘉隆、楊曜華方以桃工拆字第 1040011937 號函請業者,有關434、437、438、 442 地號違章建築已違反建築法第25 條規 定,依同法第81 條、第86 條規定「應立即停 止使用」,並請於文到30 日內自行拆除,惟 已延宕廢弛職務致釀災禐,難辭管理失當之 責。 (二)鄭紹春對於上開違失事實不予否認,惟辯禒,
88 依據桃園市政府執行違章建築拆除作業要點,電腦代號A3 級,係凡在供公眾使用建築物屋 頂避難平台、法定空地等擅自搭建,影響共同使用者權益,有礙消防救災及逃生安全之違章 台、法定空地等擅自搭建,影響共同使用者權益,有礙消防救災及逃生安全之違章 建築。……上述A1~A4 由主管機關工務局於30 個工作天內執行拆除。 89 依據桃園市政府執行違章建築拆除作業要點,電腦代號B 級,係「第二階段(中程處理) 處理建築面積在300 平 方公尺以上之違章建築;俟第一階段全部執行完成後開始 方公尺以上之違章建築;俟第一階段全部執行完成後開始辦理」 90 依據桃園市政府執行違章建築拆除作業要點,電腦代號A7 級,係指「非供公眾使用建築物 在屋頂、法定空地等擅自搭蓋之違章建築」。
99
編號 行為時 職稱 /人員 事實與理由 我目前仍認為B 級,縣府來函為A7 級。有去 週邊巡查,我沒有權力更改,本案自始至終皆 非A3、A7,故為B 級方屬正確,我從來沒有更 改為A7。不是法定空地嗎?是否供公眾使用? 是農地,我要查報的是農地,從外面一看就知 是違建。它是農地,住宅區才有法定空地,公 文表示是查農地。公所只是查報建議權,沒有 認定權。要經審核後才能認定等語。惟查,鄭 紹春未能對於違建規模與供公眾使用之用途 切實認定,錯失遏止良機,顯有怠失,所辯係 屬卸責之詞,未將違規業者依法究辦之違失, 所辯洵無可採。 (三)本案鄭紹春之行為,使得本案違建之拆除順序 延後,而影響公務機關對於違章建築管理之正 確性而足以生損害於公眾。核其所為顯已違反 公務員服務法第1 條:「公務員應遵守誓言, 忠心努力,依法律命令所定,執行其職務。」、 第5 條:「公務員應誠實清廉,謹慎勤勉,不 得有驕恣貪惰,奢侈放蕩,及冶遊賭博,吸食 菸毒等,足以損失名譽之行為。」及第7 條: 「公務員執行職務,應力求切實,不得畏難規 避,互相推諉,或無故稽延。」等規定。 3 湯佳興 (一) 104年1月20日新屋保齡球館發生火警,現場 為大型密閉鐵皮屋,縱深約75公尺,起火點 鄰近後方2樓卻水塔平台,亦有門可供進入, 台,亦有門可供進入, 可作為直接攻擊火點用,只要使用雙節梯, 不須派員進入室內,即可就近灑水滅火。 派員進入室內,即可就近灑水滅火。惟 救火指揮官湯佳興於抵達火場初期(凌晨2 時09分),即知悉火災起火點在建物後方,2 時16分亦知悉建物內受困居民已經全部救 出,卻未詢問第1、2梯次入室人員火場狀況, 掌握水帶可否進入有效攻擊位置情形,即貿 然決定派第3梯次人員從前方進入室內搜 救,造成2時56分許全面燃燒後,6名年輕消 防員無法撤出而殉職,顯有違失。 (二) 現場直通頻道與中繼頻道用途不同,惟救火 指揮官湯佳興,於火災發生當日僅攜帶1支無
100
編號 行為時 職稱 /人員 事實與理由 線電手提台救災,疏於注意大型鐵皮屋對電 磁波傳遞之重大阻礙,未使用「直通頻道」, 全程以「中繼頻道」指揮現場救災,且未曾 與室內人員進行無線電測試,確認通信是否 ,確認通信是否 良好,致其8次呼叫撤出卻無人回應,三搜自 接收靈敏度較高之車裝台聽到之殉職人員喊 救命聲,湯佳興卻未聽聞,即有違失。 (三) 救火指揮官湯佳興未依規定於入室搜索前先 登錄管制搜救小組之姓名、人數、時間及氣 瓶壓力,且未指派專人管制進出,致無人知 悉室內救災人數。其於閃燃前曾8次要求撤出 火場,在2樓平台準備入室之二搜曾喊撤退、 台準備入室之二搜曾喊撤退、 撤水線,後方水源因而遭人中斷,室內人員 因水帶扁塌無法循水線逃至室外,二搜在救 出吳東奇、黃鈺翔後,誤以為室內無人而率 相關人員離開,6名消防員喪失救援機會,湯 佳興實有違失。 (四) 本案湯佳興擔任救火指揮官,明知現場為大 型鐵皮建築,起火點在後方,未佈水線就近 攻擊火點,反於無民眾受困情況下,一再命 消防員從前方入室找尋起火點,卻未規定登 錄管制搜救小組,掌握入室人數及所佈水線 距離起火點甚遠狀況,加上全程以「中繼頻 道」指揮現場救災,未與室內人員確認無線 電通訊良窳,致火災成長,8次呼叫撤出,無 人回應,三搜自接收靈敏度較高之車裝台聽 到之殉職人員喊救命聲,湯佳興卻未聽聞, 即有違失。核其所為,顯已違反公務員服務 法第1條:「公務員應遵守誓言,忠心努力, 依法律命令所定,執行其職務。」、第7條: 「公務員執行職務,應力求切實,不得畏難 規避,互相推諉,或無故稽延。」等規定。 4 吳尚城 莊翔智 彭安宗 賴俊鋐 桃園縣政府消防局新屋分隊分隊長吳尚城於100年 7月間,告訴該隊隊員林文智就該保齡球館之消防 安全設備檢查勿如實登載、應該要放水。此後,隊 員林文智、莊翔智、彭安宗、賴俊鋐及吳尚城、謝 建勝,雖明知自100年6月3日至103年6月30日止,
101
編號 行為時 職稱 /人員 事實與理由 該保齡球館前後共6次委託專門技術人員檢查並提 出「消防安全設備檢修申報書」,均記載滅火器、 室內消防栓設備、自動撒水設備、火警自動警報設 備、緊急廣播設備、消防專用蓄水池等6項目持續 存在多項相同缺失,從未進行改善,卻分別 自 自100 年7月29日起至103年7月24日止辦理消防安全檢查 或複查時,各自在「桃園縣政府消防局第二大隊新 屋分隊消防安全檢查紀錄表」、「桃園縣政府消防 局第二大隊新屋分隊消防安全檢查紀錄表」上,由 林文智、莊翔智、彭安宗或賴俊鋐就上開項目均勾 選合格並在檢查人員欄處蓋章,由吳尚城或謝建勝 在主管核閱欄處蓋章後,將上開紀錄表置放於新屋 分隊存查,使該館管理權人不須改善缺失即可繼續 改善缺失即可繼續 營業,免於支付改善失所需費用。嗣該保齡球館於 103年12月5日提出「消防安全設備檢修申報書」仍 記載上開6項目存在相同缺失。莊翔智等人之上開 違失行為,不僅因涉犯偽造文書及圖利罪嫌而經桃 罪嫌而經桃 園地檢署檢察官提起公訴在案,且造成103年12月2 0日發生本件火災時,因火災自動警報設備、緊急 廣播設備、自動灑水設備未發生作用而未能快速查 覺、熄滅火災,1樓住戶對火災發生渾然不知,直 到濃煙冒出屋外才由鄰居報警處理,核有嚴重違 失。該府消防局對於「檢修申報結果一再不合格, 複查結果一再合格問題未能列管,致新屋消防分隊 消防安檢放水情事長期存在,安檢流於形式,核其 所為,顯已違反公務員服務法第1條:「公務員應 遵守誓言,忠心努力,依法律命令所定,執行其職 務。」、第7條:「公務員執行職務,應力求切實, 不得畏難規避,互相推諉,或無故稽延。」等規定。
FD06158 | 2015_香港_立法会_se20160301cb2-1369-1-c.p_政府當局就2015年9月27日於筲箕灣避風塘發生的三級船火作出的回應.pdf
分类:06_境外及港澳台调查报告 | 年份:2015 | 地域:香港 | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
立法會CB(2)1369/15-16(01)號文件
FD06159 | 2015_香港_立法会_secb2-29-1-c.pdf_政府當局就鍾樹根議員與何俊賢議員於2015年9月29日的聯署函件所提有關於201.pdf
分类:06_境外及港澳台调查报告 | 年份:2015 | 地域:香港 | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
立法會CB(2)29/15-16(01)號文件
FD06160 | 2016_台湾_新北新店樂活老人長照中心火災_監察院糾正案文.pdf
分类:06_境外及港澳台调查报告 | 年份:2016 | 地域:台湾 | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
1
糾 正 案 文
壹、被糾正機關:新北市政府、衛生福利部。 貳、案 由:新北市私立樂活老人長期照顧中心於105 年7月6日上午6、7點發生火災時,其火警 警鈴及緊急廣播音響因火警受信總機之 警示音響等按鍵遭人關閉,致中心人員錯 失即時滅火及快速疏散良機;且該中心未 依法隨時保持至少護理人員1人值班及置 日間8名、夜間4名照服員,僅有3名外籍 照服員執勤,且無護理人員及本國人員, 致外籍勞工因無法撥打119而從8樓跑至1 樓告知警衛協助報案,未能掌握報案及搶 救先機。又該中心自99年營運後,新北市 政府對其近3年未進行夜間查核,6次稽查 發現違規情形,每次均以限期改善完成並 複查合格結案,且101年及104年之評鑑結 果均為甲等,該府之聯合稽查、機構評 鑑、消防檢查及防火安全宣導等均流於形 式,未能發揮防範火災及即時搶救之功 效。另依據老人福利機構設立標準老人福 利機構分長期照護型機構及小型養護型 機構,其應置之照顧服務員人數,日間及 夜間並不相同,惟衛生福利部卻以刑事訴 訟法第100條之3第3項規定認定日間及夜 間,此定義顯未能符合老人福利機構照護 特性及實際輪班需求,將使機構實際僱用 人力、值班換班時間及主管機關進行督導 考核時,均嚴重面臨難以執行之困境,核 有不當,爰依法提案糾正。
2
參、事實與理由: 為調查「新北市私立樂活老人長期照顧中心(養護 型)(下稱樂活老人長照中心)於民國(下同)105年7 月6日清晨發生火警,未能及時疏散,致6死、28輕重傷 。究失火原因為何?緊急疏散及救援有無疏失?死傷長 者及其家屬有無獲得適當照護、安置及賠償?該機構有 無保險?如何善後?及其人力配置有無違法?權責機關 針對安養機構之設置規準、評鑑及查核是否確實?政府 應如何協助及提升安養機構之照顧品質及防災應變能力 ?」等情案,經向衛生福利部(下稱衛福部)、內政部、 新北市政府調閱卷證資料,並於同年8月12日至樂活老人 長照中心履勘,且訪談該中心負責人井○○女士及火災 當時在現場之6名越南籍照顧看護工,另分別於105年10 月21日及11月14日辦理諮詢會議,諮詢9名相關學者及專 家,再於同年12月2日詢問衛福部次長、社會及家庭署署 長、護理及健康照護司副司長、內政部消防署(下稱消 防署)署長、營建署副署長、新北市政府秘書長、新北 市政府消防局(下稱新北市消防局)局長、社會局(下 稱新北市社會局)副局長及相關主管人員,業經調查竣 事,確有下列疏失之處: 一、樂活老人長照中心於105年7月6日上午6、7點發生火 災時,其火警警鈴及緊急廣播音響因火警受信總機之 警示音響等按鍵遭人關閉,無法發出尖銳警鈴及人語 廣播聲,致中心人員遲至5號房濃煙竄出無法進入滅 火時才發現火災,錯失即時滅火及快速疏散良機;該 中心自當日上午1時起至火災發生時止,未依法隨時 保持至少護理人員1人值班及置日間8名、夜間4名照 服員,僅有3名外籍照服員執勤,且無護理人員及本 國人員,致外籍勞工因無法撥打119而從8樓跑至1樓 告知警衛協助報案,又因人員不足,未能掌握報案及
3
搶救先機;上開疏失造成6人死亡、28人受傷之慘劇。 該中心自99年營運後,新北市政府對其近3年未進行 夜間查核,6次稽查發現有照服員及護理人員不足、 超收兩管住民等違規情形,每次均以限期改善完成並 複查合格結案,且101年及104年之評鑑結果均為甲 等;該府雖實施18次消防安全檢查及防火安全宣導, 但均依排定日程事前通知受檢場所,故從未發現火警 受信總機之警示音響等按鍵有被關閉情形。該府之聯 合稽查、機構評鑑、消防檢查及防火安全宣導等均流 於形式,未能發揮防範火災及即時搶救之功效,核有 嚴重違失。 (一)中心於105年7月6日火災發生當日之日間及夜間, 均無護理人員及本國籍員工值勤,且執勤人力不 足: 1、老人福利法第3條規定:「本法所稱主管機關:在 中央為衛生福利部;在直轄市為直轄市政府;在 縣(市)為縣(市)政府。」同法第5條第6款及 第37條第2項復分別規定:「下列事項,由直轄 市、縣(市)主管機關掌理:……六、直轄市、 縣(市)老人福利機構之輔導設立、監督檢查及 評鑑獎勵事項。」「主管機關對老人福利機構應 予輔導、監督、檢查、評鑑及獎勵。」同法第47 條第2款規定:「主管機關依第三十七條第二項規 定對老人福利機構為輔導、監督、檢查及評鑑, 發現有下列情形之一時,應限期令其改善;屆期 未改善者,處新臺幣五萬元以上二十五萬元以下 罰鍰,並再限期令其改善:……二、違反原許可 設立之標準。」同法第48條第2款規定:「老人福 利機構有下列情形之一者,處新臺幣六萬元以上 三十萬元以下罰鍰,再限期令其改善:……二、
4
提供不安全之設施設備或供給不衛生之餐飲,經 主管機關查明屬實者。」 2、老人福利機構設立標準第11條第1項規定:「長期 照護型機構除院長(主任)外,應依下列規定配 置工作人員:一、護理人員:隨時保持至少有一 人值班;每照顧十五人應置一人;未滿十五人 者,以十五人計。……三、照顧服務員:日間每 照顧五人應置一人;未滿五人者,以五人計。設 有日間照顧者,每提供二十人之服務量,應增置 一人。」同標準第18條第1項規定:「小型養護型 機構除院長(主任)外,應依下列規定配置工作 人員:一、護理人員:隨時保持至少有一人值班; 每照顧二十人應置一人;未滿二十人者,以二十 人計。二、照顧服務員:日間每照顧八人應置一 人;未滿八人者,以八人計;夜間每照顧二十五 人應置一人;未滿二十五人者,以二十五人計。 夜間應置人力應有本國籍員工執勤,並得與護理 人員合併計算。」 3、經查新北市消防局於105年7月6日清晨7時1分接 獲樂活老人長照中心所在大樓管理員報案,該局 第四大隊新店分隊於7時9分即到達現場,該中心 於火災當時有范○○、陳○○及阮○○等3名越 南籍看護工值班,另黃○○、阮○○及黃○○等 3名越南籍看護工在該中心留宿,現場無本國籍 護理人員及照服員執勤。當時收容住民42人,在 消防人員未到達前,6名看護工將在交誼廳及房 內之7名老人疏散下樓,黃○○、阮○○另疏散2 名老人下樓,之後因濃煙過大無法進入救援,6 名看護工便下樓等待消防人員到達。該起火災造 成6人死亡,其中3人在現場明顯死亡,另3人到
5
院前死亡 1,有28人受傷送醫。依據新北市消防局 所作「火災現場勘查紀錄及原因研判」,起火處 在「8樓住房第5房內第5-3床靠南側隔間牆上吊 掛之壁扇附近處所」,因通電中之電源線發生異 極導體接觸,產生高溫引燃壁扇塑膠外殼及牆面 雕花壁紙等物品後,擴大延燒引燃鄰近可燃物 品,結論認為起火原因係:「以電氣因素引燃之 可能性較高」。 4、新北市政府函覆稱:檢視樂活老人長照中心住房 第5房內監視器,當日上午6時47分18秒左右未見 有明顯煙霧情形,6時51分許有煙飄散出現,6時 54分至55分間呈現煙霧瀰漫情形。本案通報時間 為105年7月6日7時1分,依刑事訴訟法第100條之 3第3項規定「稱夜間者,為日出前,日沒後」, 及中央氣象局資料顯示火災當日之日出時間為5 時10分,本件火災發生時間係屬日間。火災當時 長期照護床收住16人、養護床26人,依據老人福 利機構設立標準第11條第1項及第18條第1項之 規定計算,日間至少應有8名照服員 2及1名護理人 員,惟當時現場無護理人員值班,執勤看護工亦 僅范○○、陳○○及阮○○3人等語。 5、惟查新北市政府函覆稱:樂活老人長照中心工作 人員班表,護理師分3班,排班時間為:9時至17 時、17時至次日1時及1時至9時;越南籍看護工 分成2班,時間為:8時至20時及20時至次日8時 等語。據此,樂活老人長照中心於事發當天,從 凌晨1時至9時,均無護理人員值班,從前一日下
1 另1 名住民於8 月2 日因院內感染導致肺炎呼吸衰竭死亡。 2 長期照護床16 人,每5 床應置照服員1 人,應置4 名照服員;養護床26 人,每8 床應置 照服員1 人,應置4 名照服員。火災發生時,合計應置照服員8 人。
6
午8時起至事發當日上午8時止,看護工均只有3 名。但依上開規定,該中心長期照護床16人,應 置護理人員2名(每15人應置1名),隨時保持至少 1人值班;日間應置照顧服務員4人(每5人應置1 人),夜間應置2名照服員(每15人應置1人),夜 間應置人力應有本國籍員工執勤,並得與護理人 員合併計算。養護床26人,應置護理人員2名(每 20人應置1名),隨時保持至少1人值班;日間應 置照服員4人(每8人應置1人),夜間應置2名照服 員(每25人應置1人),夜間應置人力應有本國籍 員工執勤,並得與護理人員合併計算。因此,該 中心依規定總計應有4名護理人員,隨時至少有1 名護理人員值班,日間應置8名照服員,夜間應 置4名照服員,且應有本國籍員工執勤。惟火災 發生當日之日間及夜間(從早上1時起至6、7點發 生火災時止),該中心均無護理人員及本國人員 值勤,且均僅有3名外籍照服員執勤,於法不合。 6、新北市消防局主任秘書於本案履勘時陳稱:「黃 ○○、阮○○及黃○○表示,當時該3人正在員 工宿舍內休息,聽聞火警警報作響後,出房門發 現5號房有濃煙竄出,無法看清起火點、人員、 物品,無法進入滅火」、「黃○○廣播通知發生火 警,陳○○打119報案,結果未接通,並通知負 責人井○○,范○○奔至1樓告知警衛協助報 案,黃○○關閉電源總開關」等語。另新北市消 防局於7時1分接獲大樓管理員報案前,越南籍看 護工陳○○曾經以手機報案,結果未接通,此可 由該中心負責人井○○陳稱:外籍勞工陳○○以 手機撥打119電話,但因火勢濃煙蔓延快速,看 護工過於緊張,可能撥打時手抖動沒按確實才未
7
接通等語可證。可知越南籍看護工當時未能於第 一時間完成119報案,且未有本國籍照服員及護 理人員在現場執勤及應變,在需有人力從事緊急 疏散及救援之際,仍由1人下至1樓請管理員報 案,報案時間已有遲延。 7、依老人福利法第3條、第5條第6款及第37條第2項 之規定,新北市政府對於樂活老人長照中心負有 監督、輔導之責,其中照顧服務及護理人力等係 由社會局負責查核,衛生、建管及消防等單位亦 配合進行聯合查核。近年來,該中心分別於101 年6月20日及104年7月28日接受新北市政府評 鑑,結果均為甲等。另據新北市政府函覆稱:自 該中心99年營運後至火災發生前,對該中心計聯 合稽查12次,其中6次有違規情形,包括:5次照 服員不足、1次無護理人員在職、2次超收兩管住 民、1次未與住民簽訂契約、1次收費超過標準, 均經新北市社會局依老人福利法相關規定函請 限期改善,並報送改善計畫書,該中心皆於限期 內改善完成並複查合格,是以未曾被處以罰鍰或 停辦等處分;又在夜間查核部分,新北市政府近 3年未抽中樂活老人長照中心為夜間稽查對象等 語。前述樂活老人長照中心營運後經稽查發現之 違規情形概述如下: (1)99年10月21日稽查:現場收容住民27人,日間 應置照服員4人,惟僅有3名,不足1名。 (2)100年5月5日稽查:現場收容住民長期照護15 人、養護16人,日間應置照服員5人,惟僅有4 人,且依現場100年5月工作人員排班表所示,5 月5、6、10、12、13、14、16、17、18、20、 21、22、25、26、27日日間照服員均僅有4名,
8
尚不足1名;有2位住民未與中心簽訂養護契約。 (3)101年6月20日稽查:原核可收容長期照護23 人、養護26人(含收容鼻胃管及導尿管住民1 人),現場實際收容長期照護20人、養護20人(含 收容鼻胃管及導尿管住民9人),超收鼻胃管及 導尿管住民8人,違反原許可設立之標準;日間 應置照服員7人,惟依現場101年6月工作人員排 班表所示,除6月19日日間有7名照服員,其餘 29日日間均僅有5名至6名照服員,尚不足1至2 名;核備之收費標準為每人每月3萬元,惟與住 民李○簽訂契約之收費為3萬5,000元,超過核 備之收費標準。 (4)102年7月29日稽查:現場無護理人員在值;現 場收容住民長期照護17人、養護22人,應置4 名護理人員,惟依102年7月工作人員排班表所 示,僅設3名護理人員;日間應置照服員7人, 惟現場僅有6名照服員,且依現場102年7月工作 人員排班表所示,7月1、2、3、7、8、9、14、 15、21、22、28、29日日間照服員均僅有4名, 尚不足1名。 (5)103年7月2日:核定收容長照老人23床,養護 老人26人,其中養護老人需鼻胃管、導尿管兩 管護理服務需求之老人人數為1人,現場查核, 發現養護區收容兩管住民人數為2人。 (6)103年8月19日:現場收容住民長期照顧20人, 養護17人,日間應置照服員7人,惟現場僅有6 名照服員。 新北市政府於樂活老人長照中心火災前最後 3次之稽查,係於103年10月9日、104年10月8日 及105年4月21日辦理,結果為尚符老人福利機構
9
輔導查核表規定事項。 (二)中心於火災發生當時,火警受信總機之警示音響、 地區音響、移報、蓄積、自保等按鍵有關閉情事, 火警警鈴及緊急廣播音響無法正常發出警報部分: 1、按消防法第6條第1項、第2項規定:「本法所定各 類場所之管理權人對其實際支配管理之場所,應 設置並維護其消防安全設備;場所之分類及消防 安全設備設置之標準,由中央主管機關定之(第1 項)。消防機關得依前項所定各類場所之危險程 度,分類列管檢查及複查(第2項)。」同法第9條 第1項規定:應設置消防安全設備場所,其管理 權人應委託消防設備師或消防設備士,定期檢修 消防安全設備,其檢修結果應依限報請當地消防 機關備查,消防機關得視需要派員複查。「各類 場所消防安全設備設置標準」(下稱消防安全設 備設置標準)第19條第1項第7款規定:「下列場 所應設置火警自動警報設備:……七、供第十二 條第一款第六目所定長期照顧機構(長期照護 型、養護型、失智照顧型)及身心障礙福利機構 (限照顧植物人、失智症、重癱、長期臥床或身 心功能退化者)場所使用者。」同標準第12條第 1款第6目規定,老人福利機構為甲類場所。另依 據消防法施行細則第6條第2項規定,甲類場所之 管理權人每半年實施1次檢查。 2、樂活老人長照中心設有火警自動警報設備,設置 地點為該中心護理站;其探測器有1個定溫式探 測器、23個偵煙式探測器,配置地點遍及各房、 各廳;手動報警機設有2組,配置於餐廳出入口 旁室內消防栓箱上方及第二區員工宿舍出入口 牆上;緊急廣播設備,主機設置於護理站;揚聲
10
器配置地點遍及各房、各廳。依據新北市政府函 覆稱:火災發生當時,休假但留宿於員工宿房之 越南籍看護工黃○○、阮○○及黃○○,聽聞察 覺火警受信總機之主音響,而執勤中之陳○○則 無察覺受信總機之主音響等語。另據新北市政府 陳稱該中心設置之消防設備,於火災發生時之運 作情形如下: (1)消防人員到場搶救、殘除火勢後,確認該中心 火警受信總機、探測器、總機主音響皆有正常 動作,探測器偵知火災情形閃紅燈表示信號回 傳火警受信總機,且總機主音響鳴叫、火警區 域表示燈亮,惟火警警鈴、緊急廣播設備部分 現場未聞其聲。 (2)根據談話筆錄內容中,越籍看護工黃○○於員 工休息室聽到警報器嗶嗶聲響,初步研判此聲 響非為地區警鈴聲響(鈴鈴聲),也非為廣播主 機聲響(語音引導聲響),應為火警受信總機接 獲探測器動作訊號發出之主音響聲響。 (3)現場拍攝之照片及事後行政調查發現,該中心 確有將警示音響、地區音響、移報、蓄積、自 保等按鍵關閉之情事。 (4)移報按鍵關閉,故火警訊號無法連動至緊急廣 播設備,致無人語發音「火災發生、火災發 生……」之提示音;地區音響按鍵亦關閉,故 無警鈴聲。 (5)第一梯次到達搶救之同仁僅聽見護理站傳來 「嗶嗶嗶」火警受信總機主音響聲音,並未聽 見尖銳警鈴聲或人語發音之緊急廣播;檢視搶 救人員攜帶之頭盔式攝影機及熱顯像儀所拍攝 之影像,亦未從中發現警鈴及緊急廣播聲響。
11
(6)據消防局第四大隊同仁於清理火場時所拍攝 之照片顯示,受信總機之訊號移報按鍵疑似未 歸定位,故地區火警警鈴無法正常發出警報音 響,導致無法促使內部人員及早發現火警,緊 急應變。 (7)無相關證據可推斷受信總機主音響是何時發 出警示聲響。 (8)有關探測器之動作,與其裝置之位置、空間之 大小、門窗開閉、空調開閉、裝潢隔間、空氣 流動等因素有關,非單一因素影響,功能未損 之情形下仍無法明確推斷其探測器何時偵知火 警信號。 3、復據新北市政府函覆本院稱:樂活老人長照中心 自成立以來實施消防安全檢查及防火安全宣導 作為共18次,均合格,無處分紀錄。但100年上 半年未於期限內辦理自衛消防編組演練,101年 下半年未實施檢修申報,經新北市消防局分別於 100年7月12日及102年1月11日開立限期改善通 知單,嗣經複查均合格。另新北市消防局答復表 示該局對於該中心火警受信總機及其開關定位 之檢查及測試作業或程序如下: (1)消防人員至現場檢查時皆有查證火警受信總 機開關定位狀況,並未發現火警受信總機按鈕 關閉之情事,亦未曾針對該中心開立火警受信 總機相關限期改善通知單。 (2)「開關定位」之查證,係指測試火警自動警報 系統功能時,首先對火警受信總機做外觀測 試,確認各開關是否定位(開關應為ON)、盤 面是否有異常燈號等,因火警受信總機為火警 自動警報系統中擔任樞紐之設備,若有任一按
12
鈕關閉之情況,會造成火警自動警報系統功能 失效;在未確認火警受信總機開關皆定位前, 測試其他相關設備(如探測器、警鈴、緊急廣 播等),皆為徒然。 (3)最近1次管理權人委託專技人員檢修申報消防 安全設備,係由消防設備師陳明哲於105年5月 18日檢修,次(19)日申報檢修結果,申報紀 錄為「符合」規定;另消防局由新店安檢小組 於同月25日至現場進行消防安全設備檢查,當 日火警自動警報設備等測試正常,檢查紀錄表 內勾選「符合」規定。 (4)依「消防機關辦理消防安全檢查注意事項」第 5點,執行消防安全檢查前,需依排定檢查日程 事前通知受檢場所,依實務層面,多數老人福 利機構場所依法設置系統式消防設備(如室內 消防栓、火警自動警報設備等),因涉及需操作 各項系統式消防設備測試其性能、綜合功能是 否正常堪用,消防人員於檢查前會先通知機構 或業者、以及其合約簽聘之消防設備公司一同 到場檢修。 (三)綜上,樂活老人長照中心於105年7月6日上午6、7 點發生火災時,其火警警鈴及緊急廣播音響因火警 受信總機之警示音響、地區音響、移報、蓄積、自 保等按鍵均遭人關閉而未發出警報,且其未依法隨 時保持至少護理人員1人值班及置日間8名、夜間4 名照服員,日間及夜間均僅有3名外籍照服員執 勤,並無任何護理人員及本國人員,致使中心人員 無法聽聞尖銳警鈴及人語廣播聲而即時滅火及快 速疏散,遲至5號房有濃煙竄出無法進入滅火時, 才由被受信總機之嗶嗶聲音吵醒之3名休息外籍員
13
工發現火災,且外籍勞工因緊張無法撥打119報案, 只好從8樓跑至1樓告知警衛協助報案,延誤報案時 間,且因無本國人員在場及照服員人員不足,未能 掌握搶救先機,致發生6人死亡,28人受傷之慘劇。 新北市政府對該中心近3年來均未進行夜間查核, 自99年10月至103年8月進行稽查6次發現有照服員 不足、護理人員不足、超收兩管住民等違規情形, 每次均以限期改善完成並複查合格結案,且101年 及104年對該中心之評鑑結果卻均為甲等;又該府 歷年來對該中心實施18次消防安全檢查及防火安 全宣導作為,現場檢查前依排定日程事前通知受檢 場所,故從未發現火警受信總機之警示音響、地區 音響、移報、蓄積、自保等按鍵有被關閉情形,亦 未曾開立火警受信總機相關限期改善通知單。因 此,該府之聯合稽查、機構評鑑、消防檢查及防火 安全宣導等均流於形式,未能發揮防範火災及即時 搶救之功效,核有嚴重違失。 二、依老人福利機構設立標準第11條第1項及第18條第1 項規定,老人福利機構分長期照護型機構及小型養護 型機構,其應置之照顧服務員人數,日間及夜間並不 相同。對於日間及夜間之定義,衛福部未能制定符合 老人福利機構照護特性及實際輪班需求之法規,逕援 引刑事訴訟法第100條之3第3項規定「稱夜間者,為 日出前,日沒後。」惟每日之日出、日沒時間均不相 同,夏季與冬季差異更大,此定義將使機構實際僱用 人力、值班換班時間及主管機關進行督導考核時,均 面臨難以執行之困境,核有不當。 (一)依據老人福利機構設立標準第11條第1項及第18條 第1項規定,老人福利機構分長期照護型機構及小 型養護型機構,其應置之照顧服務員人數,日間及
14
夜間並不相同。 (二)新北市政府函覆本院稱:樂活老人長照中心工作人 員班表,護理師分3班,排班時間為:9時至17時、 17時至次日1時及1時至9時;越南籍看護工分成2 班,時間為:8時至20時及20時至次日8時。關於該 中心係於上午7時許發生火災,當時之人力標準究 應屬日間或夜間問題,衛福部表示:應依現行刑事 訴訟法第100條之3第3項規定,即「稱夜間者,為 日出前,日沒後。」新北市政府亦表示:本案通報 時間為105年7月6日7時1分,依刑事訴訟法第100條 之3第3項規定及中央氣象局資料,火災當日之日出 時間為5時10分,因此,火災發生時間係屬日間等 語。惟如日間或夜間工作人員人力配置係依刑事訴 訟法規定,則每日日出、日沒時間均有不同,夏季 與冬季差異更大,將使機構實際僱用人力、值班換 班時間及主管機關進行督導考核時,均面臨執行之 困境。 (三)本案諮詢學者教授表示:「排班的時間,衛福部的定 義需要修改,冬天、夏天日出、日沒的時間不一樣, 會造成實務上的困擾,應明確定義。」陳執行長則 表示:刑法的規定是用於夜間訊問的相關規定,但 照顧服務目的不同,不應做此解釋,衛福部的定義 方式,實務上執行有困難等語。 (四)綜上,依老人福利機構設立標準第11條第1項及第18 條第1項規定,老人福利機構分長期照護型機構及 小型養護型機構,其應置之照顧服務員人數,日間 及夜間並不相同。衛福部認為夜間之定義,應依刑 事訴訟法第100條之3第3項規定「稱夜間者,為日 出前,日沒後。」惟每日之日出、日沒時間均不相 同,夏季與冬季差異更大,此定義顯未能符合老人
15
福利機構照護特性及實際輪班需求,將使機構實際 僱用人力、值班換班時間及主管機關進行督導考核 時,均嚴重面臨難以執行之困境,核有不當。
16
綜上所述,樂活老人長照中心於105年7月6日上午 6、7點發生火災時,其火警警鈴及緊急廣播音響因火警 受信總機之警示音響等按鍵遭人關閉,無法發出尖銳警 鈴及人語廣播聲,致中心人員遲至5號房濃煙竄出無法進 入滅火時才發現火災,錯失即時滅火及快速疏散良機; 該中心自當日上午1時起至火災發生時止,未依法隨時保 持至少護理人員1人值班及置日間8名、夜間4名照服員, 僅有3名外籍照服員執勤,且無護理人員及本國人員,致 外籍勞工因無法撥打119而從8樓跑至1樓告知警衛協助 報案,又因人員不足,未能掌握報案及搶救先機;上開 疏失造成6人死亡、28人受傷之慘劇。該中心自99年營運 後,新北市政府對其近3年未進行夜間查核,6次稽查發 現有照服員及護理人員不足、超收兩管住民等違規情形, 每次均以限期改善完成並複查合格結案,且101年及104 年之評鑑結果均為甲等;該府雖實施18次消防安全檢查 及防火安全宣導,但均依排定日程事前通知受檢場所, 故從未發現火警受信總機之警示音響等按鍵有被關閉情 形。該府之聯合稽查、機構評鑑、消防檢查及防火安全宣 導等均流於形式,未能發揮防範火災及即時搶救之功 效。另依老人福利機構設立標準第11條第1項及第18條第1 項規定,老人福利機構分長期照護型機構及小型養護型 機構,其應置之照顧服務員人數,日間及夜間並不相同。 對於日間及夜間之定義,衛福部未能制定符合老人福利 機構照護特性及實際輪班需求之法規,逕援引刑事訴訟 法第100條之3第3項規定「稱夜間者,為日出前,日沒後。」 惟每日之日出、日沒時間均不相同,夏季與冬季差異更 大,此定義將使機構實際僱用人力、值班換班時間及主 管機關進行督導考核時,均面臨難以執行之困境。新北 市政府及衛生福利部均核有違失,爰依監察法第24條規定 提案糾正,移送行政院轉飭所屬確實檢討改善見復。
17
提案委員:高鳳仙、蔡培 村
FD06161 | 2016_台湾_新北新店樂活老人長照中心火災_監察院調查報告.pdf
分类:06_境外及港澳台调查报告 | 年份:2016 | 地域:台湾 | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
1
調 查 報 告
壹、案 由:據悉,新北市私立樂活老人長期照顧中心於 105年7月6日清晨發生火警,未能及時疏散, 致6死、28輕重傷。究失火原因為何?緊急疏 散及救援有無疏失?死傷長者及其家屬有無 獲得適當照護、安置及賠償?該機構有無保 險?如何善後?及其人力配置有無違法?權 責機關針對安養機構之設置規準、評鑑及查 核是否確實?政府應如何協助及提升安養機 構之照顧品質及防災應變能力?均有深入瞭 解之必要案。
2
貳、調查意見: 為調查「新北市私立樂活老人長期照顧中心(養護 型)(下稱樂活老人長照中心)於民國(下同)105年7 月6日清晨發生火警,未能及時疏散,致6死、28輕重傷。 究失火原因為何?緊急疏散及救援有無疏失?死傷長 者及其家屬有無獲得適當照護、安置及賠償?該機構有 無保險?如何善後?及其人力配置有無違法?權責機 關針對安養機構之設置規準、評鑑及查核是否確實?政 府應如何協助及提升安養機構之照顧品質及防災應變 能力?」等情案,經向衛生福利部(下稱衛福部)、內 政部、新北市政府調閱卷證資料,並於同年8月12日至 樂活老人長照中心履勘,且訪談該中心負責人井○○女 士及火災當時在現場之6名越南籍照顧看護工,另分別 於105年10月21日及11月14日辦理諮詢會議,諮詢相關 學者及專家,再於同年12月2日詢問衛福部呂次長寶 靜、社會及家庭署簡署長慧娟、護理及健康照護司蔡副 司長誾誾、內政部消防署(下稱消防署)陳署長文龍、 營建署王副署長榮進、新北市政府許秘書長育寧、新北 市政府消防局(下稱新北市消防局)黃局長德清、社會 局(下稱新北市社會局)林副局長昭文及相關主管人 員,業經調查竣事,臚列調查意見於后: 一、樂活老人長照中心於105 年7 月6 日上午6、7 點發 生火災時,其火警警鈴及緊急廣播音響因火警受信總 機之警示音響等按鍵遭人關閉,無法發出尖銳警鈴及 人語廣播聲,致中心人員遲至5 號房濃煙竄出無法進 入滅火時才發現火災,錯失即時滅火及快速疏散良機 ;該中心自當日上午1 時起至火災發生時止,未依法 隨時保持至少護理人員1 人值班及置日間8 名、夜間 4 名照服員,僅有3 名外籍照服員執勤,且無護理人 員及本國人員,致外籍勞工因無法撥打119 而從8 樓
3
跑至1 樓告知警衛協助報案,又因人員不足,未能掌 握報案及搶救先機;上開疏失造成6 人死亡、28 人受 傷之慘劇。該中心自99 年營運後,新北市政府對其 近3 年未進行夜間查核,6 次稽查發現有照服員及護 理人員不足、超收兩管住民等違規情形,每次均以限 期改善完成並複查合格結案,且101 年及104 年之評 鑑結果均為甲等;該府雖實施18 次消防安全檢查及 防火安全宣導,但均依排定日程事前通知受檢場所, 故從未發現火警受信總機之警示音響等按鍵有被關 閉情形。該府之聯合稽查、機構評鑑、消防檢查及防 火安全宣導等均流於形式,未能發揮防範火災及即時 搶救之功效,核有嚴重違失。 (一)中心於105年7月6日火災發生當日之日間及夜間, 均無護理人員及本國籍員工值勤,且執勤人力不 足: 1、老人福利法第3條規定:「本法所稱主管機關:在 中央為衛生福利部;在直轄市為直轄市政府;在 縣(市)為縣(市)政府。」同法第5條第6款及 第37條第2項復分別規定:「下列事項,由直轄 市、縣(市)主管機關掌理:……六、直轄市、 縣(市)老人福利機構之輔導設立、監督檢查及 評鑑獎勵事項。」「主管機關對老人福利機構應 予輔導、監督、檢查、評鑑及獎勵。」同法第47 條第2款規定:「主管機關依第三十七條第二項規 定對老人福利機構為輔導、監督、檢查及評鑑, 發現有下列情形之一時,應限期令其改善;屆期 未改善者,處新臺幣五萬元以上二十五萬元以下 罰鍰,並再限期令其改善:……二、違反原許可 設立之標準。」同法第48條第2款規定:「老人福 利機構有下列情形之一者,處新臺幣六萬元以上
4
三十萬元以下罰鍰,再限期令其改善:……二、 提供不安全之設施設備或供給不衛生之餐飲,經 主管機關查明屬實者。」 2、老人福利機構設立標準第11條第1項規定:「長期 照護型機構除院長(主任)外,應依下列規定配 置工作人員:一、護理人員:隨時保持至少有一 人值班;每照顧十五人應置一人;未滿十五人 者,以十五人計。……三、照顧服務員:日間每 照顧五人應置一人;未滿五人者,以五人計。設 有日間照顧者,每提供二十人之服務量,應增置 一人。」同標準第18條第1項規定:「小型養護型 機構除院長(主任)外,應依下列規定配置工作 人員:一、護理人員:隨時保持至少有一人值班; 每照顧二十人應置一人;未滿二十人者,以二十 人計。二、照顧服務員:日間每照顧八人應置一 人;未滿八人者,以八人計;夜間每照顧二十五 人應置一人;未滿二十五人者,以二十五人計。 夜間應置人力應有本國籍員工執勤,並得與護理 人員合併計算。」 3、經查新北市消防局於105年7月6日清晨7時1分接 獲樂活老人長照中心所在大樓管理員報案,該局 第四大隊新店分隊於7時9分即到達現場,該中心 於火災當時有范○○、陳○○及阮○○等3名越 南籍看護工值班,另黃○○、阮○○及黃○○等 3名越南籍看護工在該中心留宿,現場無本國籍 護理人員及照服員執勤。當時收容住民42人,在 消防人員未到達前,6名看護工將在交誼廳及房 內之7名老人疏散下樓,黃○○、阮○○另疏散2 名老人下樓,之後因濃煙過大無法進入救援,6 名看護工便下樓等待消防人員到達。該起火災造
5
成6人死亡,其中3人在現場明顯死亡,另3人到 院前死亡 1,有28人受傷送醫。依據新北市消防局 所作「火災現場勘查紀錄及原因研判」,起火處 在「8樓住房第5房內第5-3床靠南側隔間牆上吊 掛之壁扇附近處所」,因通電中之電源線發生異 極導體接觸,產生高溫引燃壁扇塑膠外殼及牆面 雕花壁紙等物品後,擴大延燒引燃鄰近可燃物 品,結論認為起火原因係:「以電氣因素引燃之 可能性較高」。 4、新北市政府函覆稱:檢視樂活老人長照中心住房 第5房內監視器,當日上午6時47分18秒左右未見 有明顯煙霧情形,6時51分許有煙飄散出現,6時 54分至55分間呈現煙霧瀰漫情形。本案通報時間 為105年7月6日7時1分,依刑事訴訟法第100條之 3第3項規定「稱夜間者,為日出前,日沒後」, 及中央氣象局資料顯示火災當日之日出時間為5 時10分,本件火災發生時間係屬日間。火災當時 長期照護床收住16人、養護床26人,依據老人福 利機構設立標準第11條第1項及第18條第1項之 規定計算,日間至少應有8名照服員 2及1名護理人 員,惟當時現場無護理人員值班,執勤看護工亦 僅范○○、陳○○及阮○○3人等語。 5、惟查新北市政府函覆稱:樂活老人長照中心工作 人員班表,護理師分3班,排班時間為:9時至17 時、17時至次日1時及1時至9時;越南籍看護工 分成2班,時間為:8時至20時及20時至次日8時 等語。據此,樂活老人長照中心於事發當天,從
1 另1 名住民於8 月2 日因院內感染導致肺炎呼吸衰竭死亡。 2 長期照護床16 人,每5 床應置照服員1 人,應置4 名照服員;養護床26 人,每8 床應置 照服員1 人,應置4 名照服員。火災發生時,合計應置照服員8 人。
6
凌晨1時至9時,均無護理人員值班,從前一日下 午8時起至事發當日上午8時止,看護工均只有3 名。但依上開規定,該中心長期照護床16人,應 置護理人員2名(每15人應置1名),隨時保持至少 1人值班;日間應置照顧服務員4人(每5人應置1 人),夜間應置2名照服員(每15人應置1人),夜 間應置人力應有本國籍員工執勤,並得與護理人 員合併計算。養護床26人,應置護理人員2名(每 20人應置1名),隨時保持至少1人值班;日間應 置照服員4人(每8人應置1人),夜間應置2名照服 員(每25人應置1人),夜間應置人力應有本國籍 員工執勤,並得與護理人員合併計算。因此,該 中心依規定總計應有4名護理人員,隨時至少有1 名護理人員值班,日間應置8名照服員,夜間應 置4名照服員,且應有本國籍員工執勤。惟火災 發生當日之日間及夜間(從早上1時起至6、7點發 生火災時止),該中心均無護理人員及本國人員 值勤,且均僅有3名外籍照服員執勤,於法不合。 6、新北市消防局陳主任秘書國忠於本案履勘時陳 稱:「黃○○、阮○○及黃○○表示,當時該3人 正在員工宿舍內休息,聽聞火警警報作響後,出 房門發現5號房有濃煙竄出,無法看清起火點、 人員、物品,無法進入滅火」、「黃○○廣播通知 發生火警,陳○○打119報案,結果未接通,並 通知負責人井○○,范○○奔至1樓告知警衛協 助報案,黃○○關閉電源總開關」等語。另新北 市消防局於7時1分接獲大樓管理員報案前,越南 籍看護工陳○○曾經以手機報案,結果未接通, 此可由該中心負責人井○○陳稱:外籍勞工陳○ ○以手機撥打119電話,但因火勢濃煙蔓延快
7
速,看護工過於緊張,可能撥打時手抖動沒按確 實才未接通等語可證。可知越南籍看護工當時未 能於第一時間完成119報案,且未有本國籍照服 員及護理人員在現場執勤及應變,在需有人力從 事緊急疏散及救援之際,仍由1人下至1樓請管理 員報案,報案時間已有遲延。 7、依老人福利法第3條、第5條第6款及第37條第2項 之規定,新北市政府對於樂活老人長照中心負有 監督、輔導之責,其中照顧服務及護理人力等係 由社會局負責查核,衛生、建管及消防等單位亦 配合進行聯合查核。近年來,該中心分別於101 年6月20日及104年7月28日接受新北市政府評 鑑,結果均為甲等。另據新北市政府函覆稱:自 該中心99年營運後至火災發生前,對該中心計聯 合稽查12次,其中6次有違規情形,包括:5次照 服員不足、1次無護理人員在職、2次超收兩管住 民、1次未與住民簽訂契約、1次收費超過標準, 均經新北市社會局依老人福利法相關規定函請 限期改善,並報送改善計畫書,該中心皆於限期 內改善完成並複查合格,是以未曾被處以罰鍰或 停辦等處分;又在夜間查核部分,新北市政府近 3年未抽中樂活老人長照中心為夜間稽查對象等 語。前述樂活老人長照中心營運後經稽查發現之 違規情形概述如下: (1)99年10月21日稽查:現場收容住民27人,日間 應置照服員4人,惟僅有3名,不足1名。 (2)100年5月5日稽查:現場收容住民長期照護15 人、養護16人,日間應置照服員5人,惟僅有4 人,且依現場100年5月工作人員排班表所示,5 月5、6、10、12、13、14、16、17、18、20、
8
尚不足1名;有2位住民未與中心簽訂養護契約。 (3)101年6月20日稽查:原核可收容長期照護23 人、養護26人(含收容鼻胃管及導尿管住民1 人),現場實際收容長期照護20人、養護20人(含 收容鼻胃管及導尿管住民9人),超收鼻胃管及 導尿管住民8人,違反原許可設立之標準;日間 應置照服員7人,惟依現場101年6月工作人員排 班表所示,除6月19日日間有7名照服員,其餘 29日日間均僅有5名至6名照服員,尚不足1至2 名;核備之收費標準為每人每月3萬元,惟與住 民李○簽訂契約之收費為3萬5,000元,超過核 備之收費標準。 (4)102年7月29日稽查:現場無護理人員在值;現 場收容住民長期照護17人、養護22人,應置4 名護理人員,惟依102年7月工作人員排班表所 示,僅設3名護理人員;日間應置照服員7人, 惟現場僅有6名照服員,且依現場102年7月工作 人員排班表所示,7月1、2、3、7、8、9、14、 15、21、22、28、29日日間照服員均僅有4名, 尚不足1名。 (5)103年7月2日:核定收容長照老人23床,養護 老人26人,其中養護老人需鼻胃管、導尿管兩 管護理服務需求之老人人數為1人,現場查核, 發現養護區收容兩管住民人數為2人。 (6)103年8月19日:現場收容住民長期照顧20人, 養護17人,日間應置照服員7人,惟現場僅有6 名照服員。 新北市政府於樂活老人長照中心火災前最後 3次之稽查,係於103年10月9日、104年10月8日
9
及105年4月21日辦理,結果為尚符老人福利機構 輔導查核表規定事項。 (二)中心於火災發生當時,火警受信總機之警示音響、 地區音響、移報、蓄積、自保等按鍵有關閉情事, 火警警鈴及緊急廣播音響無法正常發出警報部分: 1、按消防法第6條第1項、第2項規定:「本法所定各 類場所之管理權人對其實際支配管理之場所,應 設置並維護其消防安全設備;場所之分類及消防 安全設備設置之標準,由中央主管機關定之(第1 項)。消防機關得依前項所定各類場所之危險程 度,分類列管檢查及複查(第2項)。」同法第9條 第1項規定:應設置消防安全設備場所,其管理 權人應委託消防設備師或消防設備士,定期檢修 消防安全設備,其檢修結果應依限報請當地消防 機關備查,消防機關得視需要派員複查。「各類 場所消防安全設備設置標準」(下稱消防安全設 備設置標準)第19條第1項第7款規定:「下列場 所應設置火警自動警報設備:……七、供第十二 條第一款第六目所定長期照顧機構(長期照護 型、養護型、失智照顧型)及身心障礙福利機構 (限照顧植物人、失智症、重癱、長期臥床或身 心功能退化者)場所使用者。」同標準第12條第 1款第6目規定,老人福利機構為甲類場所。另依 據消防法施行細則第6條第2項規定,甲類場所之 管理權人每半年實施1次檢查。 2、樂活老人長照中心設有火警自動警報設備,設置 地點為該中心護理站;其探測器有1個定溫式探 測器、23個偵煙式探測器,配置地點遍及各房、 各廳;手動報警機設有2組,配置於餐廳出入口 旁室內消防栓箱上方及第二區員工宿舍出入口
10
牆上;緊急廣播設備,主機設置於護理站;揚聲 器配置地點遍及各房、各廳。依據新北市政府函 覆稱:火災發生當時,休假但留宿於員工宿房之 越南籍看護工黃○○、阮○○及黃○○,聽聞察 覺火警受信總機之主音響,而執勤中之陳○○則 無察覺受信總機之主音響等語。另據新北市政府 陳稱該中心設置之消防設備,於火災發生時之運 作情形如下: (1)消防人員到場搶救、殘除火勢後,確認該中心 火警受信總機、探測器、總機主音響皆有正常 動作,探測器偵知火災情形閃紅燈表示信號回 傳火警受信總機,且總機主音響鳴叫、火警區 域表示燈亮,惟火警警鈴、緊急廣播設備部分 現場未聞其聲。 (2)根據談話筆錄內容中,越籍看護工黃○○於員 工休息室聽到警報器嗶嗶聲響,初步研判此聲 響非為地區警鈴聲響(鈴鈴聲),也非為廣播主 機聲響(語音引導聲響),應為火警受信總機接 獲探測器動作訊號發出之主音響聲響。 (3)現場拍攝之照片及事後行政調查發現,該中心 確有將警示音響、地區音響、移報、蓄積、自 保等按鍵關閉之情事。 (4)移報按鍵關閉,故火警訊號無法連動至緊急廣 播設備,致無人語發音「火災發生、火災發 生……」之提示音;地區音響按鍵亦關閉,故 無警鈴聲。 (5)第一梯次到達搶救之同仁僅聽見護理站傳來 「嗶嗶嗶」火警受信總機主音響聲音,並未聽 見尖銳警鈴聲或人語發音之緊急廣播;檢視搶 救人員攜帶之頭盔式攝影機及熱顯像儀所拍攝
11
之影像,亦未從中發現警鈴及緊急廣播聲響。 (6)據消防局第四大隊同仁於清理火場時所拍攝 之照片顯示,受信總機之訊號移報按鍵疑似未 歸定位,故地區火警警鈴無法正常發出警報音 響,導致無法促使內部人員及早發現火警,緊 急應變。 (7)無相關證據可推斷受信總機主音響是何時發 出警示聲響。 (8)有關探測器之動作,與其裝置之位置、空間之 大小、門窗開閉、空調開閉、裝潢隔間、空氣 流動等因素有關,非單一因素影響,功能未損 之情形下仍無法明確推斷其探測器何時偵知火 警信號。 3、復據新北市政府函覆本院稱:樂活老人長照中心 自成立以來實施消防安全檢查及防火安全宣導 作為共18次,均合格,無處分紀錄。但100年上 半年未於期限內辦理自衛消防編組演練,101年 下半年未實施檢修申報,經新北市消防局分別於 100年7月12日及102年1月11日開立限期改善通 知單,嗣經複查均合格。另新北市消防局答復表 示該局對於該中心火警受信總機及其開關定位 之檢查及測試作業或程序如下: (1)消防人員至現場檢查時皆有查證火警受信總 機開關定位狀況,並未發現火警受信總機按鈕 關閉之情事,亦未曾針對該中心開立火警受信 總機相關限期改善通知單。 (2)「開關定位」之查證,係指測試火警自動警報 系統功能時,首先對火警受信總機做外觀測 試,確認各開關是否定位(開關應為ON)、盤 面是否有異常燈號等,因火警受信總機為火警
12
自動警報系統中擔任樞紐之設備,若有任一按 鈕關閉之情況,會造成火警自動警報系統功能 失效;在未確認火警受信總機開關皆定位前, 測試其他相關設備(如探測器、警鈴、緊急廣 播等),皆為徒然。 (3)最近1次管理權人委託專技人員檢修申報消防 安全設備,係由消防設備師陳○○於105年5月 18日檢修,次(19)日申報檢修結果,申報紀 錄為「符合」規定;另消防局由新店安檢小組 於同月25日至現場進行消防安全設備檢查,當 日火警自動警報設備等測試正常,檢查紀錄表 內勾選「符合」規定。 (4)依「消防機關辦理消防安全檢查注意事項」第 5點,執行消防安全檢查前,需依排定檢查日程 事前通知受檢場所,依實務層面,多數老人福 利機構場所依法設置系統式消防設備(如室內 消防栓、火警自動警報設備等),因涉及需操作 各項系統式消防設備測試其性能、綜合功能是 否正常堪用,消防人員於檢查前會先通知機構 或業者、以及其合約簽聘之消防設備公司一同 到場檢修。 (三)綜上,樂活老人長照中心於105年7月6日上午6、7 點發生火災時,其火警警鈴及緊急廣播音響因火警 受信總機之警示音響、地區音響、移報、蓄積、自 保等按鍵均遭人關閉而未發出警報,且其未依法隨 時保持至少護理人員1人值班及置日間8名、夜間4 名照服員,日間及夜間均僅有3名外籍照服員執 勤,並無任何護理人員及本國人員,致使中心人員 無法聽聞尖銳警鈴及人語廣播聲而即時滅火及快 速疏散,遲至5號房有濃煙竄出無法進入滅火時,
13
才由被受信總機之嗶嗶聲音吵醒之3名休息外籍員 工發現火災,且外籍勞工因緊張無法撥打119報案, 只好從8樓跑至1樓告知警衛協助報案,延誤報案時 間,且因無本國人員在場及照服員人員不足,未能 掌握搶救先機,致發生6人死亡,28人受傷之慘劇。 新北市政府對該中心近3年來均未進行夜間查核, 自99年10月至103年8月進行稽查6次發現有照服員 不足、護理人員不足、超收兩管住民等違規情形, 每次均以限期改善完成並複查合格結案,且101年 及104年對該中心之評鑑結果卻均為甲等;又該府 歷年來對該中心實施18次消防安全檢查及防火安 全宣導作為,現場檢查前依排定日程事前通知受檢 場所,故從未發現火警受信總機之警示音響、地區 音響、移報、蓄積、自保等按鍵有被關閉情形,亦 未曾開立火警受信總機相關限期改善通知單。因 此,該府之聯合稽查、機構評鑑、消防檢查及防火 安全宣導等均流於形式,未能發揮防範火災及即時 搶救之功效,核有嚴重違失。 二、依老人福利機構設立標準第11 條第1 項及第18 條第 1 項規定,老人福利機構分長期照護型機構及小型養 護型機構,其應置之照顧服務員人數,日間及夜間並 不相同。對於日間及夜間之定義,衛福部未能制定符 合老人福利機構照護特性及實際輪班需求之法規,逕 援引刑事訴訟法第100 條之3 第3 項規定「稱夜間者 ,為日出前,日沒後。」惟每日之日出、日沒時間均 不相同,夏季與冬季差異更大,此定義將使機構實際 僱用人力、值班換班時間及主管機關進行督導考核時 ,均面臨難以執行之困境,核有不當。 (一)依據老人福利機構設立標準第11條第1項及第18條 第1項規定,老人福利機構分長期照護型機構及小
14
型養護型機構,其應置之照顧服務員人數,日間及 夜間並不相同。 (二)新北市政府函覆本院稱:樂活老人長照中心工作人 員班表,護理師分3班,排班時間為:9時至17時、 17時至次日1時及1時至9時;越南籍看護工分成2 班,時間為:8時至20時及20時至次日8時。關於該 中心係於上午7時許發生火災,當時之人力標準究 應屬日間或夜間問題,衛福部表示:應依現行刑事 訴訟法第100條之3第3項規定,即「稱夜間者,為 日出前,日沒後。」新北市政府亦表示:本案通報 時間為105年7月6日7時1分,依刑事訴訟法第100條 之3第3項規定及中央氣象局資料,火災當日之日出 時間為5時10分,因此,火災發生時間係屬日間等 語。惟如日間或夜間工作人員人力配置係依刑事訴 訟法規定,則每日日出、日沒時間均有不同,夏季 與冬季差異更大,將使機構實際僱用人力、值班換 班時間及主管機關進行督導考核時,均面臨執行之 困境。 (三)本案諮詢學者王教授○○表示:「排班的時間,衛福 部的定義需要修改,冬天、夏天日出、日沒的時間 不一樣,會造成實務上的困擾,應明確定義。」陳 執行長敏雄則表示:刑法的規定是用於夜間訊問的 相關規定,但照顧服務目的不同,不應做此解釋, 衛福部的定義方式,實務上執行有困難等語。 (四)綜上,依老人福利機構設立標準第11條第1項及第18 條第1項規定,老人福利機構分長期照護型機構及 小型養護型機構,其應置之照顧服務員人數,日間 及夜間並不相同。衛福部認為夜間之定義,應依刑 事訴訟法第100條之3第3項規定「稱夜間者,為日 出前,日沒後。」惟每日之日出、日沒時間均不相
15
同,夏季與冬季差異更大,此定義顯未能符合老人 福利機構照護特性及實際輪班需求,將使機構實際 僱用人力、值班換班時間及主管機關進行督導考核 時,均嚴重面臨難以執行之困境,核有不當。 三、近年來國內發生多起老人福利機構火災,造成老人死 傷。現行消防安全設備設置標準對於面積未達300 平 方公尺以上之機構及101 年1 月10 日以前設立之機 構並未強制設置自動撒水設備,其自動滅火能力即嫌 不足。消防署允應研議上開機構設置簡易自動撒水設 備之可行性,因其非現行法定消防設備,消防署及衛 福部亦應研議或評估納入規範或改善計畫之必要性 ,以及評估有無輔導、獎勵老人福利機構設置相關設 備之需要,俾完備機構之消防安全國內機構設置是項 設備之可行性。 (一)依據內政部101 年1 月10 日修正前之消防安全設備 設置標準第17 條第1 項第1 款規定,供長期照顧 機構使用之建築物其樓層在10 層以下,地板面積 達1,500 平方公尺以上之場所,應設置自動撒水設 備。修正後之消防安全設備設置標準(即現行標準 )第17 條第1 項增訂第9 款規定,應設置自動撒 水設備之場所,包括:供第12 條第1 款第6 目所 定長期照顧機構(長期照護型、養護型、失智照顧 型)……等使用之場所,樓地板面積在300 平方公 尺以上者。依同設置標準第13 條規定,除各類場 所消防安全設備為滅火器、火警自動警報設備、手 動報警設備、緊急廣播設備、標示設備、避難器具 及緊急照明設備等,適用增建、改建或變更用途後 之標準外,各類場所於增建、改建或變更用途時, 其消防安全設備之設置,適用增建、改建或用途變 更前之標準。
16
(二)樂活老人長照中心於98 年7 月31 日申請變更用途 ,消防安全設備於同年11 月17 日竣工查驗結案, 12 月30 日變更用途為甲類第6 目之長期照顧機構 ,樓地板面積為722.56 平方公尺,因法律不溯既往 ,該中心適用修正前之設置標準,未設置自動撒水 設備,並未違反相關規範。另本案調查委員履勘時 ,該中心負責人井○○陳稱:樂意設置自動撒水設 備,但大樓管委會不同意等語。 (三)衛福部函覆稱:老人福利機構設置自動撒水設備除 涉及設置經費及整體建物之管線埋設工程外,機構 如設置於集合大樓建物,尚需取得公寓大廈管理委 員會之同意,難度較高等語。新北市政府許秘書長 育寧於本案詢問時陳稱:自動撒水設施設備有法律 不溯既往的問題,建請中央在公安前提考量下,進 行強制法規之修正,或對公共安全設備為補助,地 方政府亦會研議精進作為,不要受限於現行法規等 語。諮詢專家林教授慶元表示:建築法從制定迄今 ,已經過5 個時期,每個時期法令規範都不同,因 法不溯既往,早期的建築物,安全性相對比較低; 簡易將自動撒水設備接到給水系統,壓力不夠再加 壓,而不用特別做消防水箱、幫浦供給撒水,如此 不會牽涉到整棟大樓,只要從所有權使用範圍內的 供水系統即可做到,簡易撒水設備應該幾十萬元就 能完成等語。賴執行長○○表示:目前簡易自動撒 水設備未經過消防署認證,應釐清可不可行及有沒 有效果等語。 (四)消防署表示:業蒐集日本「特定設施水道連結型撒 水設備」與「滅火劑噴霧自動滅火設備設置」相關 資料及規範,上開設備無須連結發電機,且設置較 不受場所空間限制,惟水道連結型撒水設備尚涉及
17
自來水法、消防專技人員施作等權責釐清等語。另 該署對於上開設備說明如下: 1、特定設施水道連結型撒水設備,係利用場所既有 自來水管線,配接配管、水道式撒水頭,水壓不 足者可增設增壓給水裝置。以2層樓建築物,總 樓地板面積510平方公尺,配管管徑25公釐,設 置水道式噴頭56顆(含56只繼手,每顆防護範圍 13平方公尺),安裝費用約430萬日圓(約新臺幣 119萬元)。 2、滅火劑噴霧自動滅火設備,含機櫃本體、控制 盤、表示機、補助加壓設備、水槽、配管及噴頭 等,以浸潤液加水為滅火藥劑。以總樓地板面積 510 平方公尺場所設置案例,如充填640 公升 (1500公斤)藥劑,設置157顆閉鎖型噴頭(每 顆防護範圍3.24平方公尺,放射量75公升/每分 鐘),未含施工費用,設備費用約950萬日圓(約 新臺幣263萬元)。 (五)依據消防署提供之「老人福利機構等場所火災件數 與發生率統計表」,103、104及105年老人福利機構 每年發生2件火災;近3年間,身心障礙福利機構、 兒童及少年安置及教養機構及一般護理之家,則分 別發生2件、2件及4件火災。長期照顧機構所收容 之人員屬避難逃生之弱勢,國內法規對於300平方 公尺以上之機構,已規定須設置自動撒水設備,但 面積未達300平方公尺與101年1月10日以前設立之 機構,則未規範強制設立,此類機構之自動滅火能 力即嫌不足。自動撒水設備屬於主動式之滅火設 備,可於火災初期即早感知並進行滅火動作、局限 災害範圍,對於此類收容行動不便人員之場所,可 延長住民待救時間,惟因設置經費及尚需取得公寓
18
大廈管理委員會之同意,有其難度。在此情形下, 原本合法、但未設置自動撒水設備之長期照顧機 構,與修正設置標準後始設立之機構,在消防安全 上恐不相當。 (六)綜上,近年來國內發生多起老人福利機構火災,造 成老人死傷。老人福利機構收住之老人多為避難逃 生之弱勢,若僅以符合法規作為消防安全標準之依 據,實難應付該類機構滅火及救災之困難。以簡易 自動撒水設備為例,若能於火災初期即早感知並進 行滅火動作,且能兼顧機構之成本考量,應可作為 目前未設立自動撒水設備機構之改善設備。惟消防 署與本案諮詢專家推估之設置成本有所落差,有專 家對其效果亦存疑,該署允應再蒐集國際間之相關 設備資料,比對設備構件、系統、功能、造價及操 作簡易性等事項,並研議國內機構設置是項設備之 可行性;且其非現行法定消防設備,消防署及衛福 部亦應研議或評估納入規範或改善計畫之必要 性,以及評估有無輔導、獎勵老人福利機構設置相 關設備之需要,俾完備機構之消防安全。
19
參、處理辦法: 一、調查意見一,糾正新北市政府。 二、調查意見二,糾正衛生福利部。 三、調查意見三,函內政部消防署及衛生福利部檢討改進 見復。 四、檢附派查函及相關附件,送請內政及少數民族委員會 處理。 調查委員:高鳳仙、蔡培 村
FD06162 | 2016_港澳台_COMAH_performance_report_2016-17.pdf
分类:06_境外及港澳台调查报告 | 年份:2016 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
COMAH Strategic Forum Control of Major Accident Hazards Regulations 2015 (COMAH) PERFORMANCE REPORT 2016/17
Foreword The COMAH Strategic Forum is publishing this report to provide a summary of the regulatory performance of UK businesses that are subject to COMAH Regulations. The data is for the period from April 2016 to March 2017 and gives a snapshot of performance at the point that it was measured, and is an important step in developing a greater awareness of the ongoing performance of COMAH establishments as a whole.
Although we know of many examples of businesses operating safely across the COMAH sector, there is a need to avoid complacency. The COMAH Strategic Forum uses the information in this report to help us focus on areas where there is a need to develop new guidance or improve standards. We do this by working together as regulator, industry and unions, collaborating with groups such as the Chemical and Downstream Oil Industries Forum (CDOIF). In recent years we have published guidance on determining the right measures for environmental containment and improving the use of contractors on major hazard sites.
Our goal is for excellence in process safety leadership and management to become common practice across the COMAH sector and related high potential hazard industries.
If you would like to learn more about the COMAH Strategic Forum please visit: https://webcommunities.hse.gov.uk/connect.ti/COMAHSF/groupHome
Signed by Ken Rivers (Chair of the COMAH Strategic Forum) on behalf of
- Regulating under COMAH
The COMAH Regulations 2015 aim to prevent and limit the effects of major accidents which have the potential to cause significant harm to people and the environment. The regulations apply to businesses in Great Britain which store or handle sufficient quantities of flammable, toxic or environmentally hazardous substances. The COMAH Competent Authority (CA)1 is the Regulator that provides oversight of the operational safety of these businesses by carrying out a range of activities which include inspections and investigation of reported major accidents and relevant dangerous occurrences. To learn more about COMAH please visit www.hse.gov.uk/comah/index.htm
About the COMAH Strategic Forum Established in 2013, the COMAH Strategic Forum is a joint industry and regulator forum working to improve major accident hazard leadership, management and raise standards across the industry. This is achieved through the forum partners engaging collaboratively to identify and share best practice and where necessary to commission the development of new guidance.
Content of this Report This report outlines the basic composition of the COMAH sector, how the regulator prioritised its resources to carry out inspections of COMAH sites, the performance ratings assigned by the regulator following relevant inspections and information which COMAH sites are required to report directly to the regulator.
How we collect this information The performance data in this report relates to planned inspections undertaken by the regulator and information which COMAH sites are required to report directly to the regulator.
Regulatory Activity 2016/17 At the end of March 2017, there were 884 industrial installations subject to COMAH in Great Britain, covering a range of businesses from multi-site global corporations to single-site enterprises. COMAH covers businesses that range from very large complex process manufacturing sites such as oil refineries and chemicals manufacturing, to less complex operations including storage and warehousing of hazardous substances.
COMAH applies at two levels, ‘Upper Tier’ or ‘Lower Tier’ based upon the amounts of substances stored on site that could cause harm to people or the environment. Upper Tier sites store larger volumes and / or more hazardous substances and therefore have the potential to cause greater harm to people and the environment. The number of sites is not static and for 2016/17, the total number within each classification is shown in Figure: 1 below:
1 The COMAH Competent Authority in GB is the Health and Safety Executive (HSE) or the Office of Nuclear Regulation (ONR) for nuclear establishments, working jointly with the appropriate environment agency: in England the CA is HSE or ONR and the Environment Agency; in Scotland it is HSE or ONR and the Scottish Environment Protection Agency; and in Wales it is HSE or ONR and the Natural Resources Body for Wales.
Figure: 1 – ‘Number of COMAH Sites’
- Inspections at COMAH Sites
The regulator does not inspect every COMAH site annually but bases the frequency of inspection on the potential harm to people and environment from the site and its evaluation of how well those risks are being managed. This usually means that a poorly performing site is inspected more frequently by the regulator. For 2016/17, the regulator prioritised its resources to carry out inspections at the number of COMAH sites shown in Figure: 2 below: Figure: 2 – ‘COMAH Sites Inspected’
The regulator’s role in inspecting establishments is to take a sampling approach whereby it considers a range of potential topics and then chooses those which should give the best evidence of how well the business is managing its major accident risks on site. This means the regulator builds up a picture over time of the effectiveness of the business’ approach to managing safety on site.2
Strategic Priority Inspections Some inspection topics which are relevant across the COMAH sector are designated as strategic priorities and supported by an ‘Inspection Delivery Guide’, which outlines the scope of the topic and a set of objective criteria against which inspectors evaluate a site’s performance. One or more strategic priority inspection3 topics may be applicable to a COMAH site and inspectors can undertake these inspections alongside other planned inspection work. In 2016/17, the following strategic priority inspections were part of the regulators’ planned work:
Ageing Plant (AP)
Secondary and Tertiary Containment
Competence
Emergency Preparedness On-site / Off-site
Electrical, Control and Instrumentation (EC&I)
Human Factors (HF)
Key Performance Indicators Figure: 3 below shows ratings assigned for strategic priorities from April 2016 - March 2017:
2 To learn more about this approach please refer to www.hse.gov.uk/hid/hid-regulatory-model.pdf 3 For more information on CA Strategic Inspection Priorities visit: www.hse.gov.uk/comah/ca-guides.htm
Figure: 3 – ‘COMAH Strategic Priority Inspection Ratings – April 2016 – March 2017’:
The data in the table represents only those sites which had a rating assigned for a strategic priority inspection in the period April 2016-March 2017. No trends can be drawn from this data and it does not represent the performance of all sites in the COMAH sector for that period.
Strategic Priority Inspections rated as broadly compliant or better have either reached the legal standard or can do so by making straightforward improvements. Relatively few businesses will receive a rating of fully compliant for a strategic priority as there is a requirement for continuous improvement under COMAH and the regulator is much more likely to revisit businesses which are performing at a lower standard. Where a site’s performance is rated as poor or very poor it will receive increased attention from regulators and potentially enforcement action depending on the levels of non-compliance.
- Enforcement Activity by the Regulator
When the regulator finds sufficient evidence that the measures taken to manage and control major accident hazards are not of an appropriate standard it will require the COMAH site to resolve the situation. Depending upon the specific circumstances, a range of enforcement measures are applied which include regulatory actions, enforcement notices and prosecution. Figure: 4 below shows the numbers of enforcement notices served on COMAH sites over a five- year period from 2012-2016 0 10 20 30 40 50 60 70 80 Key Performance Indicators HF - Process Design HF - Procedures HF - Human Performance HF - Competence Management HF - Shift Handover Human Factors (HF) - Permit to Work EC&I Power Systems EC&I Functional Safety EC&I Explosive Atmospheres Emergency Preparedness On-Site Emergency Preparedness Off-Site Competence Secondary / Tertiary Containment AP- Leadership AP - Safety Critical Equipment AP - Resources AP - Primary Containment Ageing Plant (AP) - Asset Register Number of Sites Rated Fully Compliant Broadly Compliant Poor Very Poor
Figure: 4 - Enforcement notices served on COMAH sites
- Regulatory Actions placed on COMAH sites
Where the regulator identifies matters for improvement that do not warrant an enforcement notice, they may issue the site with a regulatory action which requires them to address the matters within a defined period of time. These issues can be complex, may involve capital expenditure, and so may take time to resolve. For this reason, not all regulatory actions issued within a work year will be closed out within that same work year. • Regulatory actions raised in 2016/17 = 1236 Figure: 5 below identifies the percentage of regulatory actions raised against the root cause problem for 2016/17:
Figure: 5 – Regulatory Actions placed on COMAH Operators 2016/17 One of the roles of the COMAH Strategic Forum is to review performance against strategic priorities and where relevant, commission further work to promote improvements, for example:
• To support delivery of a strategic topic, the Chemical and Downstream Oil Industries Forum (CDOIF) developed and published the “Guideline - Environmental Risk Tolerability for COMAH Establishments” to assist sites and regulators in carrying out risk assessments to help determine proportionate environmental containment measures.
• CDOIF was also commissioned to develop guidance on the use of external contractors in the management of Ageing Plant. This was as a direct result of analysing the performance scores against this strategic topic from 2014/15.
- Dangerous Occurrences at COMAH Sites
A dangerous occurrence is an incident with a high potential to cause death or serious injury, but which happens relatively infrequently. All businesses are required to report such incidents to the enforcing authorities and this also helps improve understanding about the circumstances and their causes which both regulators and business can use to help prevent accidents in the future. To learn more about this please refer to www.hse.gov.uk/riddor/dangerous-occurences.htm. For COMAH sites in 2016/17 the number and type of COMAH related dangerous occurrences reported by businesses is shown in Figure: 6 below:
26 8 7 4 2 1 Escape of flammable substances Escape of a hazardous substance Damage to or failure of a pipe Explosion or fire Pressure system failure Electrical incident causing fire and explosion 0 5 10 15 20 25 30 Number of Dangerous Occurrences Figure: 6 - Dangerous Occurrences at COMAH Sites 2016/17
FD06163 | 2016_港澳台_香港_立法会_淘大工业村迷你仓火灾后旧式工业大厦消防安全立法建议.pdf
分类:06_境外及港澳台调查报告 | 年份:2016 | 地域:香港 | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
2017 年4 月11 日 討論文件
立法會保安事務委員會
提升舊式工業大廈消防安全的立法建議及相關事宜
目的
本文件就提升舊式工業大廈消防安全的初步立法建議徵詢委 員的意見,並向委員簡介針對在消防安全方面有違規之處的迷你倉的 巡查及執法行動最新進展。
背景
雖然現有工業大廈符合其興建時的消防安全標準1,但樓齡較 高的工業大廈未必能達至現今標準。舉例而言,自動花灑系統是一項 非常有效的消防裝置,可於消防人員到場前遏止火勢蔓延。但1973 年前落成的工業大廈,只有部分大廈須安裝自動花灑系統2。及後消 防處修改規定,要求所有在1973年3月後落成、樓高超過兩層的工業 大廈及貨倉,必須提供自動花灑系統。1987年,消防處再修訂《最低 限度之消防裝置及設備守則》(《守則》),以規管此後落成的大廈 的消防裝置及設備,當中包括將安裝自動花灑系統的要求,擴至所有 工業大廈(不管樓高為何),並納入與現行(於2012年刊行)標準十 分相近的現代標準3。
1 工業大廈的規劃、設計和建造須符合當時的《建築物條例》(第123 章)以及 相關規例和守則,包括有關提供逃生途徑、耐火結構及消防和救援進出途徑 的規定,而消防裝置及設備則應按照消防處公布並於有關建築圖則提交時生 效的《守則》提供。 2 規管1973 年前落成的工業大廈的規定較為寬鬆,訂明“ 只有超過250 000 立 方呎(即約7 000 立方米)的房間及超過5 000 平方呎(即約500 平方米)的 儲物地庫才須安裝自動花灑系統。至於貨倉及倉庫是否需要安裝花灑系統, 則由消防處處長按個別情況決定。” 3 2012 年刊行的《守則》與1987 年版本相比,在提供消防裝置及設備的項目要 求上並沒有重大分別,但有關消防裝置及設備的詳細技術標準有所提升。 立法會CB(2)1152/16-17(03)號文件
初步的立法建議
2016 年6 月及7 月兩宗分別於牛頭角及長沙灣的舊式工業大 廈4發生的火警,使人關注到舊式工業大廈(尤其是沒有自動花灑系 統的大廈)的火警風險。我們有需要提升這些大廈的消防安全標準, 以為這些大廈的佔用人及訪客提供更佳保障。我們的目標是針對1987 年前落成的工業大廈。
提升1987 年前落成的工業大廈的消防安全標準,需要進行工 程,例如安裝某些消防裝置及設備,或改善消防安全建造。而業主及 (在某些情況下)佔用人須承擔有關費用。所以不可以只靠有關人士 自願執行,必須透過立法才可達到提升安全標準的目的。
有見及此,我們建議訂立一條新法例,規定1987 年前落成的 工業大廈的業主及佔用人,必須按照消防處處長及屋宇署署長的指 示,提升大廈所提供的消防裝置及設備和消防安全建造。這與為1987 年前落成的指定商業樓宇及訂明商業處所訂立的《消防安全(商業處 所)條例》(第502 章),以及為1987 年前落成的綜合用途樓宇及住 宅樓宇訂立的《消防安全(建築物)條例》(第572 章)所採用的立 法方式相同。
按照這個立法方式,消防處處長及屋宇署署長會獲授權向 1987 年前落成的工業大廈的業主及/或佔用人發出「指示」,要求他 們改善其大廈的消防安全措施,以符合規定的標準。視乎實際情況, 該些大廈須採取以下部分或全部措施:
有關提供消防裝置及設備的措施(由消防處執行):
(a) 安裝自動花灑系統; (b) 提供緊急照明系統; (c) 提供足夠的方向指示牌及出口指示牌; (d) 提供副電力供應; (e) 提供消防栓/喉轆系統; (f) 提供火警警報系統; (g) 在花灑系統未能覆蓋的範圍(例如電錶房)提供火警偵 測系統; (h) 提供機械通風系統的自動停止設施,以限制煙霧擴散;
4 兩幢工業大廈分別於1961 年和1963 年建成。
(i) 按照2012 年版本的《守則》提供或改善其他消防裝置及 設備;
有關消防安全建造的措施(由屋宇署執行):
(j) 提供足夠的逃生途徑; (k) 提供便利滅火和救援的進出途徑;以及 (l) 提供耐火結構以阻止火勢蔓延和確保該建築物的結構完 整。
在不損害基本消防安全的大前提下,執行當局可根據個別個案的情 況,例如當某大廈有實在技術困難去完全符合指定規定時,彈性接受 替代方案。
上述「指示」會列明所須進行的消防安全改善工程及一個合 理期限,業主或佔用人須在該期限內遵辦「指示」。如業主或佔用人 不遵辦有關「指示」,執行當局可向裁判官申請「符合消防安全令」, 指示業主或佔用人遵辦規定。如業主或佔用人沒有遵辦「指示」或「符 合消防安全令」,而大廈可能有重大的火警風險,當局亦可向區域法 院申請「禁止令」,禁止佔用該大廈。任何人沒有遵辦「指示」、「符 合消防安全令」或「禁止令」,即屬犯罪5。
技術可行性研究
消防處及屋宇署已就強制要求1987 年前落成的工業大廈提 升消防安全措施至現代水平,進行了一項技術可行性研究。整體而 言,該研究發現,為1987 年前落成的工業大廈進行所須的消防安全 改善工程基本上是可行的。舉例來說,1987 年前落成的工業大廈的 承重能力一般足以負荷安裝新的消防水缸的重量。另一方面,有關消 防安全建造的主要改善工程,即在逃生樓梯提供固定窗,以及更換有
5 現行的法例第502 章及第572 章訂明有關罪行的刑罰,概述如下: (a) 沒有遵辦「消防安全指示」:第4 級罰款(即25,000 元),並可就該指示持 續未獲遵從的每日(不足一日亦作一日計算)另處罰款2,500 元; (b) 沒有遵辦裁判官所作出的「符合消防安全令」:第5 級罰款(即50,000 元 ), 並可就該指示持續未獲遵從的每日(不足一日亦作一日計算)另處罰款 5,000 元;及 (c) 沒有遵從區域法院所作出的「禁止令」:罰款250,000 元,監禁3 年,並可 就該指示持續未獲遵從的每日(不足一日亦作一日計算)另處罰款25,000 元。
足夠耐火時效的出口門,在技術上亦可行。
但該研究亦顯示,1987 年前已存在及已入伙的工業大廈,在 結構和實際環境上,難以增建消防和救援樓梯間及提供避火層和樓梯 轉換通道。因此,在新法例下將不會就這些工程作出要求。
巡查迷你倉及跟進行動
2016 年6 月在淘大工業村迷你倉發生的火警,暴露了迷你倉 特有的火警危險。火警後,消防處、屋宇署、地政總署及勞工處隨即 於同月展開全港迷你倉的巡查工作,以根據現行法例,及時改善迷你 倉的消防安全水平。
各部門發現全港共有885 間迷你倉,並根據相關法例進行巡 查,目前正就發現有違規情況的迷你倉採取執法行動。當中,截至 2017 年2 月底,消防處已向相關迷你倉的453 名負責人發出2 548 張 消除火警危險通知書,而屋宇署亦已就455 間迷你倉發出976 張法定 命令。發現的違規事項包括:
(a) 單位逃生門裝有不合規格的門鎖; (b) 消防喉轆系統覆蓋不足; (c) 出口指示牌和方向指示牌數量不足; (d) 窗口遭阻塞/數量不足; (e) 迷你倉貯存間隔的排列布局存在安全隱患; (f) 貯存倉之間的通道闊度不足;及 (g) 貯存倉間隔導致逃生行走距離過長。
過去數月,消防處和屋宇署已經與迷你倉經營者及相關的商 會多番溝通,向他們解釋執法行動及遵從各項規定的方法。部門注意 到,某些業界成員表示在遵從某些規定時,面對一些困難。最近,部 門正在研究一些業界提出以符合訂明的消防安全規定的一些替代方 案。不過,部門亦強調,在執法過程中,部門定必以公眾安全為首要 考慮,而非商業利益。 未來路向
在未來數月,我們會繼續擬定立法建議的細節,並諮詢持份 者,包括相關業界組織及專業團體。我們計劃在2018 年年初提交條 例草案。同時,有關部門會繼續針對迷你倉違規情況採取執法行動。 徵詢意見
請委員就上述初步立法建議提出意見,並備悉針對迷你倉的 巡查及執法工作的最新進展。 保安局 屋宇署 消防處 2017 年4 月
FD06165 | 2016_香港_立法会_CB2-1849-1516-01_牛頭角道工業大廈四級火警跟進.pdf
分类:06_境外及港澳台调查报告 | 年份:2016 | 地域:香港 | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
二零一六年七月五日 資料文件
立法會保安事務委員會與發展事務委員會
二零一六年六月二十一日牛頭角道工業大廈四級火警 相關事宜及跟進工作
目的
本文件旨在向委員簡介本年六月二十一日發生於牛 頭角道一座工業大廈的四級火警的相關事宜,及交待政府的跟 進工作。
六月二十一日的四級火警
牛頭角道七號一工業大廈於六月二十一日上午 10 時59 分發生火警,於中午12 時14 分升為三級,並於晚上7 時46 分升為四級。火勢於六月二十四日下午7 時38 分受到控制, 並於六月二十五日晚上11 時15 分大致被救熄。
該工業大廈的三樓及四樓被嚴重燒毀,而五樓則被輕微 燒毀。為處理是次火警,消防處共出動了653 架次的消防及救 護車輛,及動員消防及救護人員共2 894 人次,於現場進行滅 火及救援工作。消防人員共動用10 條喉、四支鋼梯水塔、一 支梯台車水塔、五支座地中攻喉筆、12 隊煙帽隊、六部熱能 探測器及兩部正壓鼓風機灌救。
火警中共有12 名消防人員曾分別被送往基督教聯合醫院 和將軍澳醫院治理,當中一名高級消防隊長和一名消防隊目不 幸殉職,其餘人員經治療後已全部出院。六月二十七日,其中 一名受傷的消防員再前往將軍澳醫院覆診,並於同日轉往威爾 斯親王醫院,留院並接受進一步治療。
滅火和救援策略
在是次滅火和救援行動中,消防處面對的最大困難是火 場面積十分廣闊,樓宇內十分高溫,並冒出大量的濃煙。在首 先起火的三樓,設有200 多個迷你倉,佈局複雜,間隔縱橫交 立法會CB(2)1849/15-16(01)號文件
- 2 -
錯,通道狹窄,樓層部分窗戶亦被鐵板密封,加上每個倉門均 是掩出式,當倉門被破開,會阻礙消防人員前進,大大增加滅 火和救援難度。此外,每個迷你倉均是由鐵皮圍起,所以在迷 你倉內的物件起火後,熱力很快就傳導至週邊的迷你倉。而對 消防人員最大的挑戰是,由於所有迷你倉均被鎖上,而消防人 員必須在上述的惡劣環境下把這些迷你倉逐一破開,以確認個 別倉內有沒有起火。如果不能把這些倉門逐一破開,消防人員 便不能把火警撲滅。
消防處前線指揮官一直基於現場環境和形勢所作的動態 風險評估,採取最合適的滅火及救援策略。一般而言,消防處 的滅火及救援策略分為外圍工作及進入火場撲救。在外圍工作 方面,前線人員會利用鋼梯水塔及滅火喉向建築物內部射水降 溫,並防止火勢蔓延至附近樓層或樓宇。另一方面,假如現場 指揮官進行風險評估後認為情況許可,便會派遣前線人員進入 火場撲救。決定策略後,現場指揮官仍須因應火場不斷變化的 環境和形勢,繼續進行動態風險評估,以適時調整滅火策略, 確保前線人員的安全及滅火及救援工作的效率。動態風險評估 除了是由指揮官不時親自進入火場評估現場形勢後作出外,受 過相關訓練的前線人員亦會不斷評估火場內的環境和形勢,向 指揮官報告,以決定是否需要調整滅火策略,亦會視乎形勢出 現突變時決定是否需要撤退。 監察火場樓宇結構安全
一般而言,如火警仍在撲救中,屋宇署人員不能進入受 火警影響的處所視察。屋宇署人員會在外圍視察樓宇的狀況, 包括樓宇是否有傾斜,樓層及其結構構件是否有下陷、變形、 剝落等情況,或有限度進入沒受火警影響的樓層,以評估火警 對樓宇安全的影響。此外,屋宇署人員亦會透過消防人員在火 場傳達的信息,包括口頭描述、照片等,評估樓宇的狀況,並 向消防人員提供意見。待火警熄滅後及現場溫度降至適合水平 時,屋宇署會派員入內視察樓宇結構,詳細評估火警對樓宇安 全的影響。
就此宗火警而言,屋宇署採取了以上的方法評估火警對 樓宇安全方面所造成的影響。由於是次火警時間較長,消防處 仍在撲救的時候,屋宇署人員於六月二十二日上午7 時至二十
- 3 -
六日下午5 時一直留守現場,24 小時監察樓宇外圍的狀況, 並與消防處保持緊密聯繫,以了解火場的情況及變化。消防人 員亦一直留意現場的樓宇結構的狀況,及向屋宇署提供火場照 片及觀察所得的資料,讓屋宇署進行評估。
火警被救熄後,屋宇署人員視察涉事樓宇內部,沒有發 現結構支柱有混凝土剝落;但發現三樓及四樓有數條橫樑有混 凝土剝落,而三樓天花有部分位置出現較嚴重混凝土剝落。由 於現場仍有大量雜物,故屋宇署人員仍未能視察部分位置。屋 宇署會陸續安排視察有關位置的結構構件。根據屋宇署現時對 已視察的樓宇結構構件的初步評估,沒有跡象顯示樓宇的結構 構件有倒塌的危險。屋宇署會深入評估樓宇受火警影響的受損 程度,當中包括採集樣本進行實驗室測試。 跟進工作
政府非常關注此宗火警。為加強迷你倉消防安全而成立 的跨部門工作小組,已於六月二十七日召開首次會議,探討採 取短、中及長期措施,加強迷你倉及類似處所的消防安全。
消防處、屋宇署、地政總署和勞工處已於六月二十八日 開始巡查全港的迷你倉及類似處所,檢視這些處所有否違反現 行法例的規定。巡查會先針對位於沒有裝設自動灑水系統的工 業大廈的迷你倉,再擴及其他迷你倉。如巡視過程中發現有違 規之處,部門會盡快採取執法行動。其中,消防處會在有需要 時,根據《消防條例》(第95 章)就迷你倉內有火警危險之 處,發出「消除火警危險通知書」,甚至會考慮要求營運者進 行改善工程,消除火警危險。如發現有僭建物,屋宇署亦可根 據《建築物條例》(第123 章)發出命令,要求清拆有關僭建 物。
消防處及相關部門已安排與本港迷你倉的主要營運者會 面。部門會要求營運者盡快採取各種可行的管理措施,提升消 防安全,其中包括加強保安人手,防止危險品的存放,加強員 工的防火訓練等等。
跨部門小組下一步會討論如何修訂法例,以加強規管迷 你倉。
- 4 -
- 另外,消防處已成立跨部門火警調查專案組,聯同警方、
屋宇署、機電工程署、政府化驗所及獨立專業人士,循四個方 向調查該宗事故,包括:(一)調查火警成因,及是否涉及刑 事成份;(二)調查引致消防人員殉職和受傷的原因;(三) 檢視工業樓宇的使用及營運模式;及(四)檢視現時消防處的 工作程序,是否有可優化的地方。專案組已進入火場展開搜證 工作,並會稍後向死因庭提交報告。 結論
- 請委員備悉上述資料。
保安局 發展局 消防處 屋宇署
二零一六年六月
FD06166 | 2016_香港_立法会_CB2-1849-1516-02_迷你倉事宜背景資料簡介.pdf
分类:06_境外及港澳台调查报告 | 年份:2016 | 地域:香港 | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
立法會 Legislative Council
立法會CB(2)1849/15-16(02)號文件
檔 號: CB1/PL/DEV + CB2/PL/SE
保安事務委員會與發展事務委員會
立法會秘書處就2016年7月5日的聯席會議 擬備的參考便覽
有關迷你倉的事宜
據政府當局表示,目前並無特定法例規管香港的迷你 倉,亦沒有就迷你倉的地點訂下規定。保安事務委員會及發展 事務委員會從未討論過有關迷你倉的事宜。政府當局因應近日 在牛頭角道一幢工業大廈內的迷你倉發生四級火警所發出的相 關新聞公報載於附錄I至VII。議員在2015年4月29日及11月18日 的立法會會議上,曾提出有關迷你倉的質詢。議員提出的質詢 及政府當局的答覆載於附錄VIII及IX。
政府當局將於2016年7月5日的聯席會議上,向保安事務 委員會和發展事務委員會簡介就上述四級火警的跟進工作。
立法會秘書處 議會事務部2 2016年6月30日
FD06167 | 2016_香港_立法会_secb2-1354-1-c.pdf_蔣麗芸議員於2016年4月21日建議事務委員會討論2016年4月19日在灣仔發生.pdf
分类:06_境外及港澳台调查报告 | 年份:2016 | 地域:香港 | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
立法會CB(2)1354/15-16(01)號文件
FD06168 | 2016_香港_立法会_旧式工业大厦及迷你仓消防安全_背景资料简介.pdf
分类:06_境外及港澳台调查报告 | 年份:2016 | 地域:香港 | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
立法會 Legislative Council
立法會CB(2)1152/16-17(04)號文件
檔號:CB2/PL/SE
保安事務委員會
立法會秘書處為2017 年4 月11 日會議 擬備的背景資料簡介
舊式工業大廈的消防安全
目的
本文件提供有關舊式工業大廈及迷你倉庫的消防安全 的背景資料,並綜述議員過往就這議題所作的討論。
背景
據政府當局表示,目前並無特定法例規管香港的迷你倉 庫,亦沒有就迷你倉庫的地點訂下規定。2016 年6 月21 日在牛 頭角道一座工業大廈發生的四級火警("火警事故")喚起社會對 舊式工業大廈和迷你倉庫的消防安全的關注。有關政府部門其 後已加強巡查,並嚴加執法,指令違規迷你倉庫改善倉內間隔 及逃生通道等問題。政府當局亦計劃制訂法例,提升舊式工業 大廈的消防安全水平。 保安事務委員會及發展事務委員會的商議工作
保安事務委員會("事務委員會")及發展事務委員會於 2016 年7 月5 日舉行聯席會議,討論有關火警事故及政府當局 採取的跟進行動的事宜。下文綜述委員就舊式工業大廈內迷你 倉庫的消防安全提出的主要關注事項。
巡查迷你倉庫
委員關注到,政府當局有否掌握有關本港迷你倉庫實際 數目的資料。委員尤其關注被識別為有消防安全問題的迷你倉
- 2 -
庫的數目,以及對於未有遵行消防安全規定的迷你倉庫擁有 人,政府當局將會採取甚麼行動。 政府當局表示,在火警事故發生後,消防處已就本港的 迷你倉庫總數進行初步評估。相關的政府部門,包括消防處、 屋宇署、地政總署和勞工處已於2016 年6 月28 日開始巡查全 港的迷你倉庫及類似處所,檢視這些處所有否違反現行法例的 規定。在完成有關巡查後,即會確定本港迷你倉庫的實際數目。 如在巡查期間發現有任何違規情況,即會盡快採取執法行動。 這些行動包括,在確定迷你倉庫有火警危險時根據《消防條例》 (第95 章)發出消除火警危險通知書("通知書");如發現有僭建 物,則會根據《建築物條例》(第123 章)發出清拆僭建物的法定 命令。
委員其後獲告知,本港現時約有885 個迷你倉庫。截至 2017 年1 月15 日,消防處巡查了756 個迷你倉庫,並就286 個 迷你倉庫發出了1 472 份通知書。屋宇署巡查了755 個迷你倉 庫,並就288 個迷你倉庫發出了631 張命令,包括315 張清拆 令、315 張修葺令及1 張中止更改用途命令。跟進行動包括向沒 有遵從有關命令的人士或機構提出檢控。
規管迷你倉庫
鑒於現時並無專為規管本港迷你倉庫而訂立的法例,委 員關注到,政府當局如何處理迷你倉庫的營運所引起的問題。 部分委員認為,政府當局應就有關在迷你倉庫提供消防裝置及 設備、迷你倉庫的建造及內部間隔物料、用於鎖上迷你倉的鎖, 以及不應儲存於迷你倉內的物品類別等事宜,進行嚴格檢討。
據政府當局表示,為加強迷你倉庫的消防安全,由保安 局領導的跨部門工作小組業已成立,探討採取短、中及長期措 施,以加強迷你倉庫及類似處所的消防安全。有關的政府部門 會安排與迷你倉庫的經營者會面,並要求他們盡快採取所有可 行的管理措施,以提升消防安全,包括增加保安人員的數目、 防止儲存危險品、加強僱員的防火訓練等。
部分委員認為,政府當局應就迷你倉業設立發牌制度。 政府當局表示,跨部門工作小組會研究如何修訂法例,以加強 規管迷你倉庫。當局亦正考慮要求迷你倉的租戶列明儲存在其 倉內的物品,以確保他們不會在倉內存放易燃或危險物品。
部分委員亦關注到,在綜合用途樓宇及住宅樓宇經營迷 你倉庫,會對迷你倉庫附近一帶的居民構成火警危險。他們要
- 3 -
求政府當局澄清,使用綜合用途樓宇及住宅樓宇作迷你倉庫用 途有否違反法例,以及工作小組會否就在該類樓宇經營迷你倉 庫進行檢討。
據政府當局表示,《消防安全(商業處所)條例》(第502 章)及《消防安全(建築物)條例》(第572 章)已分別就改善商業樓 宇、指明商業處所、綜合用途樓宇及住用樓宇的消防安全作出 規定。迷你倉庫是否違反契約條件不能一概而論,視乎相關迷 你倉庫的實際運作,以及有關地段相關租約的條款和條件而定。 如相關地契訂明只批准有關地段作"工業"用途,則經營任何貨倉 (包括迷你倉庫)一般而言屬違反地契。就地契訂明地段只可 作"工業及/或倉庫"或"倉庫"用途的工業大廈而言,迷你倉庫不 會被視作違反相關地契訂明的"倉庫"用途。 最新發展
政府當局將會在2017 年4 月11 日的事務委員會會議上, 就提升舊式工業大廈消防安全的立法建議及相關事宜,向事務 委員會作出簡報。 相關文件
相關文件一覽表載於附錄,該等文件已登載於立法會 網站。 立法會秘書處 議會事務部2 2017 年4 月7 日
附錄
舊式工業大廈的消防安全
相關文件
委員會 會議日期 文件 立法會 2015 年4 月29 日 會議過程正式紀錄 (第13 項質詢)
立法會 2015 年11 月18 日 會議過程正式紀錄 (第7 項質詢)
發展事務委員會及 保安事務委員會
2016 年7 月5 日 (議程第II 項) 議程 會議紀要
立法會 2016 年7 月13 日 會議過程正式紀錄 (第1 及17 項質詢)
保安事務委員會
2017 年2 月7 日 (議程第IV 項)
議程 會議紀要
立法會秘書處 議會事務部2 2017 年4 月7 日
FD06169 | 2016_香港_立法会_牛头角迷你仓四级火警_政府跟进工作.pdf
分类:06_境外及港澳台调查报告 | 年份:2016 | 地域:香港 | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
二零一六年七月五日 資料文件
立法會保安事務委員會與發展事務委員會
二零一六年六月二十一日牛頭角道工業大廈四級火警 相關事宜及跟進工作
目的
本文件旨在向委員簡介本年六月二十一日發生於牛 頭角道一座工業大廈的四級火警的相關事宜,及交待政府的跟 進工作。
六月二十一日的四級火警
牛頭角道七號一工業大廈於六月二十一日上午 10 時59 分發生火警,於中午12 時14 分升為三級,並於晚上7 時46 分升為四級。火勢於六月二十四日下午7 時38 分受到控制, 並於六月二十五日晚上11 時15 分大致被救熄。
該工業大廈的三樓及四樓被嚴重燒毀,而五樓則被輕微 燒毀。為處理是次火警,消防處共出動了653 架次的消防及救 護車輛,及動員消防及救護人員共2 894 人次,於現場進行滅 火及救援工作。消防人員共動用10 條喉、四支鋼梯水塔、一 支梯台車水塔、五支座地中攻喉筆、12 隊煙帽隊、六部熱能 探測器及兩部正壓鼓風機灌救。
火警中共有12 名消防人員曾分別被送往基督教聯合醫院 和將軍澳醫院治理,當中一名高級消防隊長和一名消防隊目不 幸殉職,其餘人員經治療後已全部出院。六月二十七日,其中 一名受傷的消防員再前往將軍澳醫院覆診,並於同日轉往威爾 斯親王醫院,留院並接受進一步治療。
滅火和救援策略
在是次滅火和救援行動中,消防處面對的最大困難是火 場面積十分廣闊,樓宇內十分高溫,並冒出大量的濃煙。在首 先起火的三樓,設有200 多個迷你倉,佈局複雜,間隔縱橫交 立法會CB(2)1849/15-16(01)號文件
- 2 -
錯,通道狹窄,樓層部分窗戶亦被鐵板密封,加上每個倉門均 是掩出式,當倉門被破開,會阻礙消防人員前進,大大增加滅 火和救援難度。此外,每個迷你倉均是由鐵皮圍起,所以在迷 你倉內的物件起火後,熱力很快就傳導至週邊的迷你倉。而對 消防人員最大的挑戰是,由於所有迷你倉均被鎖上,而消防人 員必須在上述的惡劣環境下把這些迷你倉逐一破開,以確認個 別倉內有沒有起火。如果不能把這些倉門逐一破開,消防人員 便不能把火警撲滅。
消防處前線指揮官一直基於現場環境和形勢所作的動態 風險評估,採取最合適的滅火及救援策略。一般而言,消防處 的滅火及救援策略分為外圍工作及進入火場撲救。在外圍工作 方面,前線人員會利用鋼梯水塔及滅火喉向建築物內部射水降 溫,並防止火勢蔓延至附近樓層或樓宇。另一方面,假如現場 指揮官進行風險評估後認為情況許可,便會派遣前線人員進入 火場撲救。決定策略後,現場指揮官仍須因應火場不斷變化的 環境和形勢,繼續進行動態風險評估,以適時調整滅火策略, 確保前線人員的安全及滅火及救援工作的效率。動態風險評估 除了是由指揮官不時親自進入火場評估現場形勢後作出外,受 過相關訓練的前線人員亦會不斷評估火場內的環境和形勢,向 指揮官報告,以決定是否需要調整滅火策略,亦會視乎形勢出 現突變時決定是否需要撤退。 監察火場樓宇結構安全
一般而言,如火警仍在撲救中,屋宇署人員不能進入受 火警影響的處所視察。屋宇署人員會在外圍視察樓宇的狀況, 包括樓宇是否有傾斜,樓層及其結構構件是否有下陷、變形、 剝落等情況,或有限度進入沒受火警影響的樓層,以評估火警 對樓宇安全的影響。此外,屋宇署人員亦會透過消防人員在火 場傳達的信息,包括口頭描述、照片等,評估樓宇的狀況,並 向消防人員提供意見。待火警熄滅後及現場溫度降至適合水平 時,屋宇署會派員入內視察樓宇結構,詳細評估火警對樓宇安 全的影響。
就此宗火警而言,屋宇署採取了以上的方法評估火警對 樓宇安全方面所造成的影響。由於是次火警時間較長,消防處 仍在撲救的時候,屋宇署人員於六月二十二日上午7 時至二十
- 3 -
六日下午5 時一直留守現場,24 小時監察樓宇外圍的狀況, 並與消防處保持緊密聯繫,以了解火場的情況及變化。消防人 員亦一直留意現場的樓宇結構的狀況,及向屋宇署提供火場照 片及觀察所得的資料,讓屋宇署進行評估。
火警被救熄後,屋宇署人員視察涉事樓宇內部,沒有發 現結構支柱有混凝土剝落;但發現三樓及四樓有數條橫樑有混 凝土剝落,而三樓天花有部分位置出現較嚴重混凝土剝落。由 於現場仍有大量雜物,故屋宇署人員仍未能視察部分位置。屋 宇署會陸續安排視察有關位置的結構構件。根據屋宇署現時對 已視察的樓宇結構構件的初步評估,沒有跡象顯示樓宇的結構 構件有倒塌的危險。屋宇署會深入評估樓宇受火警影響的受損 程度,當中包括採集樣本進行實驗室測試。 跟進工作
政府非常關注此宗火警。為加強迷你倉消防安全而成立 的跨部門工作小組,已於六月二十七日召開首次會議,探討採 取短、中及長期措施,加強迷你倉及類似處所的消防安全。
消防處、屋宇署、地政總署和勞工處已於六月二十八日 開始巡查全港的迷你倉及類似處所,檢視這些處所有否違反現 行法例的規定。巡查會先針對位於沒有裝設自動灑水系統的工 業大廈的迷你倉,再擴及其他迷你倉。如巡視過程中發現有違 規之處,部門會盡快採取執法行動。其中,消防處會在有需要 時,根據《消防條例》(第95 章)就迷你倉內有火警危險之 處,發出「消除火警危險通知書」,甚至會考慮要求營運者進 行改善工程,消除火警危險。如發現有僭建物,屋宇署亦可根 據《建築物條例》(第123 章)發出命令,要求清拆有關僭建 物。
消防處及相關部門已安排與本港迷你倉的主要營運者會 面。部門會要求營運者盡快採取各種可行的管理措施,提升消 防安全,其中包括加強保安人手,防止危險品的存放,加強員 工的防火訓練等等。
跨部門小組下一步會討論如何修訂法例,以加強規管迷 你倉。
- 4 -
- 另外,消防處已成立跨部門火警調查專案組,聯同警方、
屋宇署、機電工程署、政府化驗所及獨立專業人士,循四個方 向調查該宗事故,包括:(一)調查火警成因,及是否涉及刑 事成份;(二)調查引致消防人員殉職和受傷的原因;(三) 檢視工業樓宇的使用及營運模式;及(四)檢視現時消防處的 工作程序,是否有可優化的地方。專案組已進入火場展開搜證 工作,並會稍後向死因庭提交報告。 結論
- 請委員備悉上述資料。
保安局 發展局 消防處 屋宇署
二零一六年六月
FD06170 | 2017_台湾_住宅用火災警報器推广设置案_监察院调查报告.pdf
分类:06_境外及港澳台调查报告 | 年份:2017 | 地域:台湾 | 严重程度: | 场所:住宅/民房 | 起火原因:焊接/动火 | 来源格式:pdf
監察院內政及族群委員會調查報告結案情形一覽表
報表編號:L0607 第1 頁,共2 頁 製表日期:110/04/26 案號 機關改善與處置情形 結案情形 106 內調 0058 ◆產生行政變革績效 1.為配合住宅用火災警報器之推動,內政部(營建署)業於108 年12 月20 日以內授營建管字第 1080822819 號函修正「強化建築物施工管理作業原則」,於伍、使用執照核發作業原則增訂 三、(七)消防設備竣工查驗合格證明須包括未達供公眾使用建築物之5 層以下住宅(公寓)之住 宅用火災警報器經當地消防主管機關檢查合格之證明文件,請各主管建築機關參考納入建築管 理自治規則(條例),於源頭有效管控並提升住宅用火災警報器設置,各地方主管建築機關辦 理成果(註:臺南市於核發使照時備註欄加註住警器應由起造人自主設置並維護,嘉義縣後續 將配合於執照中加註,其他各縣市均已於建造或使用中加註,並於新建、增建、改建之竣工查 驗前應取得住警器經當地消防主管機關檢查合格之證明文件),截至108 年底,新建、增建、 改建建築物共申請8,996 件、1 萬4,624 戶,新增設置住警器共計3 萬4,282 戶。2.內政部營建 署業以107 年7 月9 日營署建管字第1071234297 號函請各相關公會協助推廣居家正確使用合 格裝修耐燃建材、防焰物品及製品;查相關公會業已轉發各地公會會員配合執行,並於相關講 習中宣導。3.賡續要求各大專校院運用賃居生(房東)會議、租屋博覽會及賃居關懷安全訪視等 時機,教育學生(房東)檢視賃居建物環境安全事項及消防(逃生)設備等外觀是否符合妥善堪用 (自主檢核),以強化學生賃居安全觀念,另於108 年度6 至9 床符合6+1 項檢核要項表棟樓 2,470 棟,合格率98.64%,4 至5 床符合6+1 項檢核要項表棟樓5,178 棟,合格率98.79%,持 續複查滾動修正。4.內政部消防署持續推動「住宅防火對策2.0」及宣導作為,其他各機關亦 配合辦理相關之建築管理、家用電器設備、電線等本質安全等。 ◆其他績效 1.截至109 年5 月31 日止,全國住宅場所火災警報器設置率達76.26%。2.其他各類場所住警 器設置率:(1)狹小巷弄設置率59.55%,(2)住宅式宮廟設置率57.82%,(3)獨居老人設置率 內政及族群委員會109.07.21 第5 屆第74 次會議決議 : 結 案存查。
監察院內政及族群委員會調查報告結案情形一覽表
報表編號:L0607 第2 頁,共2 頁 製表日期:110/04/26 案號 機關改善與處置情形 結案情形 89.17%,(4)低收入戶設置率77.38%,(5)身心障礙者設置率56.16%,(6)水源不足地區建築 物設置率達50.52%。
填表人員簽章: 單位主管人員:
FD06171 | 2017_台湾_淮南经济技术开发区2017·2·16_17·2_较大_火灾_调查报告.md
分类:06_境外及港澳台调查报告 | 年份:2017 | 地域:台湾 | 严重程度: | 场所: | 起火原因:电气;用火不慎;吸烟;危化/自燃;纵火;锂电池热失控 | 来源格式:md
2017年2月16日6时许,淮南经济技术开发区国际汽配城(系商业推广名称,项目名称为“淮南台湾车配城”,以下统称“淮南国际汽配城”)一经营户发生一起火灾事故,造成4人死亡,1人受伤。 事故发生后,省委省政府领导高度重视并作出重要批示,要求全力组织抢救,最大限度减少人员伤亡,妥善处理善后事宜,并尽快查明原因,严防类似事故再次发生。接事故报告后,省安全监管局迅速贯彻落实省委省政府领导批示精神,要求事故发生地妥善做好善后和舆情把控等工作。 依据《安全生产法》、《生产安全事故报告和调查处理条例》(国务院令第493号)、《安徽省生产安全事故报告和调查处理办法》(省政府令第232号)等有关法律法规,经省政府批准,3月7日,成立了省淮南经济技术开发区“2017•2•16”较大火灾事故事故调查组(以下简称事故调查组),由省安全监管局分管领导任组长,省安全监管局、监察厅、公安厅、住建厅、商务厅、工商管理局、省总工会、淮南市政府派员参加,全面负责事故调查工作。同时邀请了省人民检察院派人参加,并选调了省内相关行业的2名专家参与事故调查工作。 事故调查组坚持“科学严谨、依法依规、实事求是、注重实效”和“四不放过”的原则,通过现场勘验、调查取证、检测鉴定、专家论证,查明了事故发生的经过、原因、人员伤 亡和直接经济损失情况,认定了事故性质和责任,提出了对有关责任人员和责任单位的处理建议,分析了事故暴露出的突出问题和教训,提出了加强和改进工作的措施建议。 调查认定,这是一起生产安全责任事故。
一、事故基本情况
(一)事故发生经过。
2017年2月16日6时许,“淮南国际汽配城”27栋大通区领先汽车配件经营部(广告牌为“辉龙自动变速箱维修车间”,以下简称“经营部”)102号商铺一层北半部起火,烟火通过101号的楼梯和102号的升降机孔洞迅速向上蔓延,居住在27栋101、 102号三层的金亚等5人,发现起火后欲通过房门从楼梯逃生,此时烟火封门,樊帅彬等4人畏惧楼高,未及时跳楼逃生,事故造成4人(樊帅彬,男,25岁,河南荥阳人,公民身份号码:41018*****013;牛江南,男,31岁,河南宜阳人,公民身份号码:41032430;孙明辉,男,18岁,河南鹿邑人,公民身份号码:41272294;王廷学,男,60岁,河南修武人,公民身份号码:41082*****019,系经营户王小强的父亲)当场死亡,1人(金亚,男,19岁,河南鹿邑人)从三层窗户跳楼逃生,轻伤。
(二)事故现场情况。
事故现场位于“淮南国际汽配城”27栋101、102、103号商铺,该栋建筑于2015年1月建成,钢混框架结构,建筑高度11.9 m,占地面积748 m²,建筑面积2244 m²,地上共三层,四周设置环形车道,周围均为同类建筑。事发场所27栋101、102、103号商铺,一层为工作间和办公室,二层 主要存放汽车配件,三层为员工宿舍,其中101、102 号商 铺的一、二层连通,102、103 号商铺的二层和101、102、 103 号商铺的三层通过隔墙上的门洞相通,101、103 号商铺 内分别设置一部钢质敞开楼梯(101-103 号商铺各楼层室内 平面示意图如下)。 事发场所1 层室内平面示意图 事发场所2层室内平面示意图 事发场所3层室内平面示意图
(三)天气情况。
2017 年2 月15 日18 时至2017 年2 月16 日08 时,事 发地天气实况为无雷电,出现了1.1mm 降水,极大风速3m/s, 方向偏东风,气温7.8℃~14.1℃,相对湿度42%~99%。
(四)人员伤亡和直接经济损失情况。
事故共造成4人死亡,1人受伤,直接经济损失约合人民 币302.05万元。
二、事故应急处置和救援情况
(一)事故单位应急处置情况。
事发前,樊帅彬、牛江南、孙明辉、金亚4名员工在“经 营部”101号商铺的三层房间就寝,王廷学在102号商铺三层 房间就寝,103号商铺无人居住。 王廷学最先发现火情,随后呼喊叫醒其他4人,此时火 势、烟雾迅速蔓延,6时05分金亚拨打火警电话,被困人员 呼喊求救,并试图打开宿舍房门逃生,但外面烟雾很大无法 出去,金亚从三层窗户跳楼逃生,其他4人不愿意跳楼,被困在101、102号商铺的三层房间内被烧致死。 6时08分王小强接到樊帅彬电话,6时30分许赶到现场, 101、102号商铺一层和二层已全部着火、三层冒着浓烟,103号商铺没有起火,他踹开103号商铺一层卷闸门试图冲进去救人,被保安和女友制止,此时金亚已从三楼跳下。“经营部”员工蒋丽丽电话告知居住在蚌埠的宫宇,获悉后于8时许到达事故现场。 6时05分,淮南市公安消防支队指挥中心和120指挥中心分别接到火灾事故报警。 7时50分后,事发所在地及有关部门相继得知事故信息,逐级按渠道进行了报告。
(二)事故救援及善后情况。
事故发生后,淮南市委、市政府主要领导及时赶赴现场,部署事故处置、善后、维稳、舆情把控等工作,事发当日上午印发《关于汲取“2•16”较大火灾事故教训 切实做好当前消防安全工作的紧急通知》,下午,市政府主要领导组织召开安全生产紧急工作会议,进一步部署安排事故善后等工作。事故处置过程中,淮南市共出动公安干警35名、灭火车辆3台、救护车辆2台。 3月5日,就民事赔偿事宜与死者家属达成一致意见,4名死者遗体就地火化,家属返乡。
三、事故直接原因认定
(一)最初起火部位认定。
通过调查询问、现场勘验和监控视频等综合分析,认定 该起火灾事故的起火部位为“经营部”102号商铺一层,起火点位于102号商铺一层北部。
(二)起火原因分析认定。
- 排除放火嫌疑。经淮南经济技术开发区(以下简称“淮南经开区”)公安分局刑侦大队调查,排除人为放火嫌疑。
- 排除遗留火种。根据现场勘验、走访询问和视频监控证实,起火点不具备有烟头等遗留火种引燃起火的条件。
- 排除自燃。据查实,起火点处有轿车、电动运货车、齿轮油等物品,且现场不具备自燃的条件。
- 排除生活用火不慎。经对相关人员询问,证实该场所人员不使用明火做饭,勘验也未发现现场有使用明火的器具。
5.排除雷击。根据气象部门提供的气象证明材料,当日事发地无雷电。
- 排除外来火源。通过视频监控,起火前“经营部”102号商铺外围无燃放烟花爆竹、飞火等任何异常情况。
7.电气线路故障引起火灾的调查分析。
起火点处用电设备有照明灯具、举升机、自动变速箱清洗交换机、轿车和电动运货车,其中照明灯具、举升机和自动变速箱清洗交换机处于断电关闭状态,轿车电瓶被拆除,轿车内部不带电,经勘验,以上用电设备未发现任何电气故障。电动运货车自2月15日21时许一直处于充电状态,且电动运货车及其充电线路位于起火点处,对电动运货车及其地面残留的电气线路上发现的金属熔痕,送公安部消防局天津火灾物证鉴定中心进行技术鉴定,有电热作用形成的熔痕。 最终认定事故直接原因是:该“经营部”102号商铺一 层北部停放的电动运货车长时间充电,造成电气线路故障,引发火灾。
四、事故企业经营活动情况
(一)事故发生单位基本情况。
事发“经营部”,由王小强和宫宇共同出资合伙经营,经营场所位于“淮南国际汽配城”项目27栋101、102、103号商铺。现有员工合计6人,其中4名男员工常住101号商铺三层。 “淮南国际汽配城”为“淮南经开区”重点招商引资项目,由淮南黄埔置业有限公司(以下简称“淮南黄埔置业”)开发,2015年1月,项目一期竣工验收,由安徽联华实业集团所属安徽泉山湖商业运营管理有限公司(以下简称“安徽泉山湖商运公司”)负责招商运营,并委托安徽南山物业管理有限公司(以下简称“安徽南山物管公司”),提供前期物业管理服务。 27栋101、102、103号商铺为一期项目,其中101、102号商铺的产权人为胡礼宗,经约定,101、102号商铺委托“淮南黄浦置业”运营管理,103号商铺的产权单位为“淮南黄浦置业”,27栋101、102、103号商铺的建筑面积合计为336.01㎡。 2014年12月,宫宇与“安徽泉山湖商运公司”签订了《淮南国际汽配城商铺租赁合同》,合同期限自2014年12月至2017年12月,经营范围:汽车维修。同时签订了《淮南国际汽配城商户经营承诺书》,约定了从事生产经营应遵守的13项郑重承诺,自此销售汽车配件、润滑油等,同时 从事汽车维修经营业务,并在户外悬挂了辉龙专业自动变速箱维修车间广告牌(见下图), 事发后 事发后悬挂在户外的悬挂在户外的广告牌广告牌 2 2010166年年33月月,,办理了办理了工商工商登记注册登记注册手续手续,,注册注册名称为名称为大大通区领先汽车配件经营部通区领先汽车配件经营部。经营者:王小强。经营者:王小强,注册号:,注册号:340493600065695340493600065695,资金数额:,资金数额:1010万元,经营场所:万元,经营场所:淮南淮南国国际汽配城际汽配城2727栋栋101101号。号。监管区域:一般监管区域,风险行监管区域:一般监管区域,风险行业:丙级风险行业,经营范围:汽车配件、润滑油的销售业:丙级风险行业,经营范围:汽车配件、润滑油的销售(依(依法须经批准的项目,经相关部门批准后方可开展经营活动)法须经批准的项目,经相关部门批准后方可开展经营活动),,经营期限起:经营期限起:20162016年年33月。月。
(二)事故相关项目。
“淮南国际汽配城” “淮南国际汽配城”项目。项目。占地占地138.97138.97亩,亩,分分33期期开发,开发,建筑总面积建筑总面积127635.48127635.48m²,其中一期其中一期建筑面积建筑面积53091.97 53091.97 m²(平平面分面分布见下图)布见下图),,于于 20112011年年1010月经淮南市发展和改革委员会月经淮南市发展和改革委员会批复立项,批复立项,20112011年底淮南市规划委员会第十一次会议批准通年底淮南市规划委员会第十一次会议批准通过本项目的总体规划,过本项目的总体规划,20132013年年33月开始月开始建设,建设,20152015年年11月竣工月竣工验收验收,,由由“安徽泉山湖商运公司”“安徽泉山湖商运公司”负责运营并负责运营并签订了《委托签订了《委托经营管理合同》,委托期限自经营管理合同》,委托期限自20152015年年11月月--20182018年年1212月止月止,,共计共计44年年,每年签订一次,每次期限,每年签订一次,每次期限11年,年,与“安徽南山物管公司”与“安徽南山物管公司” 签订了《前期物业服务合同》,合同期限自 签订了《前期物业服务合同》,合同期限自20132013年年1212月至月至20182018年年1212月止。月止。 淮南国际汽配城项目一期平面分布图
(三)事故相关单位情况。
1 1..“淮南黄埔置业“淮南黄埔置业””,,成立于成立于20112011年年55月,统一社会信用月,统一社会信用代码:代码:91340400573041045G(191340400573041045G(1--1) 1) ,,类型:有限责任公司(台类型:有限责任公司(台港澳与境内合资),港澳与境内合资),注册资本:五百万美元整,注册营业期注册资本:五百万美元整,注册营业期限:限:20112011年年55月月--20412041年年55月,经营范围:在月,经营范围:在HGTP10055HGTP10055地块上地块上进行房地产开发经营、物业管理,公司住所:进行房地产开发经营、物业管理,公司住所:“淮南“淮南经开区”经开区”管委会大楼内。管委会大楼内。 2 2..“安徽泉山湖商运公司”“安徽泉山湖商运公司”,,成立于成立于20132013年年33月,统一社月,统一社会信用代码:会信用代码:9134040063615969C(19134040063615969C(1--1) 1) ,,类型:一人有限责类型:一人有限责任公司,任公司,注册资本:一百万圆整,注册营业期限:长期,经注册资本:一百万圆整,注册营业期限:长期,经营范围:商业运营管营范围:商业运营管理、营销策划、招商、预包装食品兼散理、营销策划、招商、预包装食品兼散装食品,乳制品(不含婴幼儿配方奶粉)批发兼零售(依法装食品,乳制品(不含婴幼儿配方奶粉)批发兼零售(依法须经批准的项目,经相关部门批准后方可开展经营活动),须经批准的项目,经相关部门批准后方可开展经营活动),公司住所:淮南市田家庵区联华泉山湖小区公司住所:淮南市田家庵区联华泉山湖小区B41B41--77。。 以上 以上两家两家经营单位经营单位的的法法定代表定代表人人均均为为汪凤云汪凤云。。 3 3..“安徽南山物管公司”“安徽南山物管公司”,,成立于成立于20132013年年99月,统一社会月,统一社会信用代码:信用代码:9134040007872405XA9134040007872405XA,法人代表:胡俊,注册资,法人代表:胡俊,注册资本:陆百万圆整,注册营业期限:本:陆百万圆整,注册营业期限:20132013年年99月月--20332033年年99月,经月,经营范围(一般经营项目):物业管理,会所商业运营管理,营范围(一般经营项目):物业管理,会所商业运营管理,停车场管理,房屋租赁代理,家政服务,园停车场管理,房屋租赁代理,家政服务,园林绿化工程施工,林绿化工程施工,无许可经营项目。公司住所:淮南市田家庵区金家岭合淮路无许可经营项目。公司住所:淮南市田家庵区金家岭合淮路西侧联华西侧联华•金水城金水城B41B41--22栋栋。。 “淮南国际汽配城”由安徽南山物业管理有限公司 “淮南国际汽配城”由安徽南山物业管理有限公司台湾台湾项目城服务中心项目城服务中心(以下简称“安徽南山物管公司台湾项目城(以下简称“安徽南山物管公司台湾项目城服务中心”)服务中心”)负责负责日常日常物业服务物业服务,项目经理为周亚,项目经理为周亚。。
五、有关责任单位存在的主要问题
(一)事发“经营部”。未及时办理工商注册登记手续;未及时办理工商注册登记手续;未申请取得机动车维修经营许可,擅自从事机动车维修等经未申请取得机动车维修经营许可,擅自从事机动车维修等经营业务,不具备安全生产条件;营业务,不具备安全生产条件;未未落实落实安全生产主体责任,安全生产主体责任,安全管理极其混乱,安全管理极其混乱,安全生产教育培训严重缺失;未按规定安全生产教育培训严重缺失;未按规定落实区域防火和经营场所消防落实区域防火和经营场所消防安全责任,未按规定配备室内安全责任,未按规定配备室内消防设施设备,未消防设施设备,未制定应急预案,制定应急预案,未未安排员工安排员工参加参加物业等单物业等单位组织的消防演练位组织的消防演练,致使安全隐患长期存在。,致使安全隐患长期存在。○注
———————————— —————————————————————————————————————————————————————— ○ ○注注《公司法》第六条《公司法》第六条 设立公司,应当依法向公司登记机关申请设立登记。符合本法设立公司,应当依法向公司登记机关申请设立登记。符合本法规定的设立条件的,由公司登记机关分别登记为有限责任公司或者股份有限公司;不符合本规定的设立条件的,由公司登记机关分别登记为有限责任公司或者股份有限公司;不符合本法规定的设立条件的,不得登记为有限责任公司或者股份有限公司。法规定的设立条件的,不得登记为有限责任公司或者股份有限公司。 法律、行政法规规定设立公司必须报经批准的,应当 法律、行政法规规定设立公司必须报经批准的,应当在公司登记前依法办理批准手续。在公司登记前依法办理批准手续。《安全生产法》第十七条《安全生产法》第十七条 生产经营单位应当具备本法和有关法律、行政法规和国家标生产经营单位应当具备本法和有关法律、行政法规和国家标 准或者行业标准规定的安全生产条件;不具备安全生产条件的,不得从事生产经营活动。 准或者行业标准规定的安全生产条件;不具备安全生产条件的,不得从事生产经营活动。 《道路运输条例》第三十七条 《道路运输条例》第三十七条 申请从事机动车维修经营的,应当具备下列条件:申请从事机动车维修经营的,应当具备下列条件:1.1.有相应的机动车维修场地;有相应的机动车维修场地;2.2.有必要的设备、设施和技术人员;有必要的设备、设施和技术人员;3.3.有健全的机动车维修管理有健全的机动车维修管理制度;制度;4.4.有必要的环境保护措施。有必要的环境保护措施。 《道路运输条例》第三十九条 《道路运输条例》第三十九条 申请从事机动车维修经营的,应当在依法向工商行政管申请从事机动车维修经营的,应当在依法向工商行政管理机关办理有关登记手续后,向所在地县级道路运输管理机构理机关办理有关登记手续后,向所在地县级道路运输管理机构提出申请,并分别附送符合本提出申请,并分别附送符合本条例第三十八条规定条件的相关材料。县级道路运输管理机构应当自受理申请之日起条例第三十八条规定条件的相关材料。县级道路运输管理机构应当自受理申请之日起1515日日 内审查完毕,作出许可或者不予许可的决定,并书面通知申请人。 内审查完毕,作出许可或者不予许可的决定,并书面通知申请人。 《机动车维修管理规定》(交通运输部令 《机动车维修管理规定》(交通运输部令20162016年第年第3737号)第十一条第号)第十一条第44项项 有健全的维修管理制度。包括质量管理制度、安全生产管理制度、车辆维修档案管理制度、有健全的维修管理制度。包括质量管理制度、安全生产管理制度、车辆维修档案管理制度、人员培训制度、设备管理制度及配件管理制度。具体要求按照国家标准《汽车维修业开业条人员培训制度、设备管理制度及配件管理制度。具体要求按照国家标准《汽车维修业开业条件》件》(GB/T16739)(GB/T16739)相关条款的规定执行。相关条款的规定执行。 《汽车维修业开业条件》 《汽车维修业开业条件》(GB/T167(GB/T16739) 39) 第第22部分:汽车专项维修业户自动变速器修理部分:汽车专项维修业户自动变速器修理人员条件:企业管理负责人、技术负责人及检验人员等均应经过有关培训,并取得行业主管人员条件:企业管理负责人、技术负责人及检验人员等均应经过有关培训,并取得行业主管部门颁发的从业资格证书,持证上岗。企业管理负责人应熟悉汽车维修业务,具备企业经营、部门颁发的从业资格证书,持证上岗。企业管理负责人应熟悉汽车维修业务,具备企业经营、管理能力,并了解发动机维修及相关行业的法规及标准。技术负责人应具有汽车维修或相关管理能力,并了解发动机维修及相关行业的法规及标准。技术负责人应具有汽车维修或相关专业的大专以上文化程度,或具有汽车维修或相关专业的中级以上专业技术职称。应熟悉汽专业的大专以上文化程度,或具有汽车维修或相关专业的中级以上专业技术职称。应熟悉汽车维修业务,并掌握汽车维修相关行业的法规及标准等。同时设施、设备必须符合相应开业车维修业务,并掌握汽车维修相关行业的法规及标准等。同时设施、设备必须符合相应开业条件条件。条件条件。 《安徽省道路运输条例》第三十九条 《安徽省道路运输条例》第三十九条 申请从事机动车申请从事机动车维修经营的,应当依法取得道路维修经营的,应当依法取得道路运输经营许可证,持许可证件办理工商营业执照。运输经营许可证,持许可证件办理工商营业执照。 《消防法》第十六条 《消防法》第十六条 机关、团体、企业、事业等单位应当履行下列消防安全职责:落机关、团体、企业、事业等单位应当履行下列消防安全职责:落实消防安全责任制,制定本单位的消防安全制度、消防安全操作规程,制定灭火和应急疏散实消防安全责任制,制定本单位的消防安全制度、消防安全操作规程,制定灭火和应急疏散预案等。预案等。 《消防法》第十九条 《消防法》第十九条 生产、储存、经营其他物品的场所与居住场所设置在同一建筑物生产、储存、经营其他物品的场所与居住场所设置在同一建筑物内的,应当符合国家工程建设消防技术标准。内的,应当符合国家工程建设消防技术标准。 《安徽省消防条例》第十三条 《安徽省消防条例》第十三条 单位应当经常组织开展对本单位人员的消防安全宣传教单位应当经常组织开展对本单位人员的消防安全宣传教育。育。
(二)“淮南黄埔置业”。该单位法定代表人未严格履该单位法定代表人未严格履行安全生产法定责任,不行安全生产法定责任,不具备与本单位所从事的生产经营活具备与本单位所从事的生产经营活动相应的安全生产知识和管动相应的安全生产知识和管理能力。与“安徽泉山湖商运公理能力。与“安徽泉山湖商运公司”和“安徽南山物管公司”分别签订的司”和“安徽南山物管公司”分别签订的《委托经营管理合《委托经营管理合同》和《前期物业服务合同》,未在合同中约定双方的安全同》和《前期物业服务合同》,未在合同中约定双方的安全生产管理职责。生产管理职责。○○注注
————————— ————————————————— ○ ○注注《安全生产法》《安全生产法》第五条第五条 生产经营单位的主要负责人对本单位的安全生产工作全面生产经营单位的主要负责人对本单位的安全生产工作全面负责。负责。 《安全生产法》 《安全生产法》第第二十二十四条四条 生产经营单位的主要负责人和安全管理人员必须生产经营单位的主要负责人和安全管理人员必须具备与本具备与本单位所从事的生产经营活动相应的安全生产知识和管理能力。单位所从事的生产经营活动相应的安全生产知识和管理能力。 《 《安全生产法》安全生产法》第四十六条第四十六条 生产经营项目、场所发包或者出租给其他单位的,生产经生产经营项目、场所发包或者出租给其他单位的,生产经营单位应当与承包单位、承租单位签订专门的安全生产管理协议,或者在承包合同、租赁合营单位应当与承包单位、承租单位签订专门的安全生产管理协议,或者在承包合同、租赁合同中约定各自的安全生产管理职责;生产经营单位对承包单位、承租单位的安全生产工作统同中约定各自的安全生产管理职责;生产经营单位对承包单位、承租单位的安全生产工作统一协调、管理,定期进行安全检查,发现安全问题的,应当及时督促整改。一协调、管理,定期进行安全检查,发现安全问题的,应当及时督促整改。”” (三)“安徽泉山湖商运公司”。该单位该单位法定代表人未法定代表人未严格履行安全生产法定责任,严格履行安全生产法定责任,主要负责人未履行安全生产工主要负责人未履行安全生产工作全面责任,将事发场所租赁给作全面责任,将事发场所租赁给不具备不具备安全生产条件并未经安全生产条件并未经过机动车维修许可的经营户过机动车维修许可的经营户,,从事机动车维修经营从事机动车维修经营业务。在业务。在与与“经营部”经营户宫宇“经营部”经营户宫宇签订的《商铺租赁合同》和签订的《商铺租赁合同》和《淮南国《淮南国 际汽配城商户经营承诺书》 际汽配城商户经营承诺书》中,未约定中,未约定双方安全双方安全生产生产管理管理职职责,责,未及时未及时督促督促事故事故单位消除存在的安全生产隐患单位消除存在的安全生产隐患。。○○注注 ————————————————————— ————————————————————————————————————————————————— ○ ○注注《安全生产法》《安全生产法》第四条第四条 生产经营单位必须遵守本法和其他有关安全生产的法律、生产经营单位必须遵守本法和其他有关安全生产的法律、法规,加强安全生产管理,建立、健全安全生产责任制和安全生产规章制度,改善安全生产法规,加强安全生产管理,建立、健全安全生产责任制和安全生产规章制度,改善安全生产条件,推进安全生产标准化建设,提高安全生产水平,确保安全生产条件,推进安全生产标准化建设,提高安全生产水平,确保安全生产。。 《安 《安全生产法》全生产法》第五条第五条 生产经营单位的主要负责人对本单位的安全生产工作全面负生产经营单位的主要负责人对本单位的安全生产工作全面负责。责。 《安全生产法》 《安全生产法》第四十六条第四十六条 生产经营单位不得将生产经营项目、场所、设备发包或者生产经营单位不得将生产经营项目、场所、设备发包或者出租给不具备安全生产条件或者相应资质的单位或者个人。出租给不具备安全生产条件或者相应资质的单位或者个人。 生产经营项目、场所发包或者出租给其他单位的,生产经营单位应当与承包单位、承租 生产经营项目、场所发包或者出租给其他单位的,生产经营单位应当与承包单位、承租单位签订专门的安全生产管理协议,或者在承包合同、租赁合同中约定各自的安全生产管理单位签订专门的安全生产管理协议,或者在承包合同、租赁合同中约定各自的安全生产管理职责;生产经营单位对承包单位、承租单位的安全生产工作统一协调、管理,定期进行安全职责;生产经营单位对承包单位、承租单位的安全生产工作统一协调、管理,定期进行安全检查,发现安全问题的,应当及时督促整改。”检查,发现安全问题的,应当及时督促整改。” 《安全生产法》第四十 《安全生产法》第四十三条三条 生产经营单位的安全生产管理人员应当根据本单位的生产生产经营单位的安全生产管理人员应当根据本单位的生产经营特点,对安全生产状况进行经常性检查;对检查中发现的安全问题,应当立即处理;不经营特点,对安全生产状况进行经常性检查;对检查中发现的安全问题,应当立即处理;不能处理的,应当及时报告本单位有关负责人,有关负责人应当及时处理。检查及处理情况应能处理的,应当及时报告本单位有关负责人,有关负责人应当及时处理。检查及处理情况应当如实记录在案。当如实记录在案。
(四)“安徽南山物管公司”。该该单位单位法定代表法定代表人未严人未严格履行安全生产法定责任,格履行安全生产法定责任,未设置专门安全管理机构,未明未设置专门安全管理机构,未明确项目服务中心安全生产管理职责,未督促事故单位履行确项目服务中心安全生产管理职责,未督促事故单位履行《消防安全责任书》责任和义务,《消防安全责任书》责任和义务,20162016年年1010月下达的月下达的《商《商铺消防安全检查告知书》,但未采取有效措施铺消防安全检查告知书》,但未采取有效措施消除消除隐患隐患,未,未协助协助相关单位和部门相关单位和部门做好物业管理区域内的安全防范做好物业管理区域内的安全防范和消和消防宣传、教育和培训防宣传、教育和培训工作工作,未督促“经营部”制定火灾逃生,未督促“经营部”制定火灾逃生预案,开展火灾逃生演练预案,开展火灾逃生演练。。○○注注
———————————— —————————————————————————— ○ ○注注《安全生产法》《安全生产法》第四条第四条 生产经营单位必须遵守本法和其他有关安全生产的法律、法生产经营单位必须遵守本法和其他有关安全生产的法律、法规,加强安全生产管理,建立、健全安全生产责任制和安全生产规章制度,改善安全生产条规,加强安全生产管理,建立、健全安全生产责任制和安全生产规章制度,改善安全生产条件,推进安全生产标准化建设,提高安全生产水平,确保安全生产件,推进安全生产标准化建设,提高安全生产水平,确保安全生产。。 第五条 第五条 生产经营单位的主要负责人对本单位的安全生产工作全面负责。生产经营单位的主要负责人对本单位的安全生产工作全面负责。 《安全生产法》 《安全生产法》第二十一条第二十一条 矿山、金属冶炼、建筑施工、道路运输单位和危险物品的矿山、金属冶炼、建筑施工、道路运输单位和危险物品的生产、经营、储存单位,应当设置安全生产管理机构或者配备专职安全生产管理人员。生产、经营、储存单位,应当设置安全生产管理机构或者配备专职安全生产管理人员。 “ “前款规定以外的其他生产经营单位,从业人员超过一百人的,应当设置安全生产管理前款规定以外的其他生产经营单位,从业人员超过一百人的,应当设置安全生产管理机构或者配备专职安全生产管理人员;从业人员在一百人以下的,应当配备专职或者兼职的机构或者配备专职安全生产管理人员;从业人员在一百人以下的,应当配备专职或者兼职的安全生产管理人员。安全生产管理人员。 《物业管理条例》第四十六条 《物业管理条例》第四十六条 物业服务企业应当协助做好物业管理区域内的安全防范物业服务企业应当协助做好物业管理区域内的安全防范工作。发生安全事故时,物业服务企业在采取应急措施的同时,应当及时向有关行政管理部工作。发生安全事故时,物业服务企业在采取应急措施的同时,应当及时向有关行政管理部门报告,协助做好救助工作。门报告,协助做好救助工作。
(五)“淮南经开区”及部门。
1.
- 经贸发展局经贸发展局,,未认真按照《安全生产法》第六十二条未认真按照《安全生产法》第六十二条
第 第11款、款、《关于进一步落实安全生产监督管理职责的意见》《关于进一步落实安全生产监督管理职责的意见》经贸发展局经贸发展局(安全生产监督管理局)职责第六条和(安全生产监督管理局)职责第六条和《《关于印关于印发淮南经开区管委会内设机构主要职责发淮南经开区管委会内设机构主要职责的通知的通知》经贸发展局》经贸发展局职责第四职责第四条条等有关规定等有关规定,,开展安全生产监督检查和隐患排查开展安全生产监督检查和隐患排查治理工作,治理工作,未未及时及时发现事故单位存在的安全隐患,并督促事发现事故单位存在的安全隐患,并督促事故单位及时消除隐患故单位及时消除隐患。。○○注注 ———————————— ———————————————————————— ○ ○注注《安全生产法》第六十二条《安全生产法》第六十二条 安全生产监督管理部门和其他负有安安全生产监督管理部门和其他负有安全生产监督管理职全生产监督管理职责的部门依法开展安全生产行政执法工作,对生产经营单位执行有关安全生产的法律、法规责的部门依法开展安全生产行政执法工作,对生产经营单位执行有关安全生产的法律、法规和国家标准或者行业标准的情况进行监督检查,行使以下职权:(一)进入生产经营单位进和国家标准或者行业标准的情况进行监督检查,行使以下职权:(一)进入生产经营单位进行检查,调阅有关资料,向有关单位和人员了解情况行检查,调阅有关资料,向有关单位和人员了解情况…… 淮南经开区《关于进一步落实安全生产监督管理职责的意见》经贸发展局(安全生产监 淮南经开区《关于进一步落实安全生产监督管理职责的意见》经贸发展局(安全生产监督管理局)职责第六条督管理局)职责第六条 负责商贸行业安全监管工作。负责商贸行业安全监管工作。 《关于印发淮南经开区管委会内设机构主要职责的通知》经贸发展局职责第四条 《关于印发淮南经开区管委会内设机构主要职责的通知》经贸发展局职责第四条,负责,负责重大项目谋划、管理和实施工作。重大项目谋划、管理和实施工作。 2 2..淮南市工商局经开区分局,淮南市工商局经开区分局,未未按照《安全生产法》第按照《安全生产法》第六六十二条第十二条第11款、款、《国务院《国务院无照经营查处取缔办法无照经营查处取缔办法》》第四条第四条第第11款款、《关于印发淮南市工商行政管理局主要职责内设机、《关于印发淮南市工商行政管理局主要职责内设机构和人员编制规定的通知》主要职责第二条构和人员编制规定的通知》主要职责第二条等等有关规定,有关规定,开开展安全生产监督检查展安全生产监督检查和查处取缔无照经营行为和查处取缔无照经营行为,,未未及时及时发现发现事故单位事故单位非法从事汽车维修经营业务并将违法事实通报相非法从事汽车维修经营业务并将违法事实通报相关审批部门关审批部门。。○○注注 —————————— —————————— ○ ○注注《安全生产法》第六十二条《安全生产法》第六十二条 安全生产监督管理部门和其他负有安全生产监督管理职安全生产监督管理部门和其他负有安全生产监督管理职责的部门依法开展安全生产行政执法工作,对生产经营单位执行有关安全生产的法律、法责的部门依法开展安全生产行政执法工作,对生产经营单位执行有关安全生产的法律、法规规和国家标准或者行业标准的情况进行监督检查,行使以下职权:(一)进和国家标准或者行业标准的情况进行监督检查,行使以下职权:(一)进入生产经营单位进入生产经营单位进行检查,调阅有关资料,向有关单位和人员了解情况行检查,调阅有关资料,向有关单位和人员了解情况;;…….. 《国务院无照经营查处取缔办法》 《国务院无照经营查处取缔办法》 第四条第四条下列违法行为,由工商行政管理部门依照本下列违法行为,由工商行政管理部门依照本办法的规定予以查处:办法的规定予以查处:((一一))应当取得而未依法取得许可证或者其他批准文件和营业执照,擅应当取得而未依法取得许可证或者其他批准文件和营业执照,擅自从事经营活动的无照经营行为自从事经营活动的无照经营行为;;…… 《关于印发淮南 《关于印发淮南市工商行政管理局市工商行政管理局主要职责主要职责内设机构和人员编制规定内设机构和人员编制规定的通知》的通知》主要职责主要职责第二条:承担依法查处取缔无照经营的责任。第二条:承担依法查处取缔无照经营的责任。 3
3..淮南经开区公安消防部门淮南经开区公安消防部门
( (11)淮南)淮南经开区经开区公安分局,未按照《安全公安分局,未按照《安全生产法》第六生产法》第六十二条第十二条第11款、《消防法》第五十三条第款、《消防法》第五十三条第11款、《消防监督检款、《消防监督检查规定》第四条第查规定》第四条第11款款、《、《机关、团体、企业、事业单位消机关、团体、企业、事业单位消 防安全管理规定 防安全管理规定》》第十三条第十三条第第11款、《款、《安徽省消防安全重点安徽省消防安全重点单位界定标准单位界定标准》第一条第》第一条第11款、《关于印发淮南市公安局直款、《关于印发淮南市公安局直属及派出机构主要职责内设机构和人员编制规定的通知》明属及派出机构主要职责内设机构和人员编制规定的通知》明确的各分局主要职责、《关于印发全区“家确的各分局主要职责、《关于印发全区“家庭式商铺(作坊)”庭式商铺(作坊)”消防安全专项整治行动方案的通知》等有关规定,消防安全专项整治行动方案的通知》等有关规定,将“国际将“国际汽配城”列入汽配城”列入20162016年度年度消防安全重点单位消防安全重点单位,认真组织、指,认真组织、指导和监督相关导和监督相关单位单位开展消防安全工作。开展消防安全工作。○○注注 ———— ———————————————————————————————————————————————————— ○ ○注注《安全生产法》第六十二条《安全生产法》第六十二条 安全生产监督管理部门和其他负有安全生产监督管理职安全生产监督管理部门和其他负有安全生产监督管理职责的部门依法开展安全生产行政执法工作,对生产经营单位执行有关安全生产的法律、法规责的部门依法开展安全生产行政执法工作,对生产经营单位执行有关安全生产的法律、法规和国家标准或者行业标准的情况进行监督检查,行使以下职权:(一)进和国家标准或者行业标准的情况进行监督检查,行使以下职权:(一)进入生产经营单位进入生产经营单位进行检查,调阅有关资料,向有关单位和人员了解情况行检查,调阅有关资料,向有关单位和人员了解情况;;…….. 《消防法》第五十三条 《消防法》第五十三条 公安机关消防机构应当对机关、团体、企业、事业等单位遵守公安机关消防机构应当对机关、团体、企业、事业等单位遵守消防法律、法规的情况依法进行监督检查。消防法律、法规的情况依法进行监督检查。 《消防监督检查规定》第四 《消防监督检查规定》第四条条 上级公安机关消防机构应当对下级公安机关消防机构实上级公安机关消防机构应当对下级公安机关消防机构实施消防监督检查的情况进行指导和监督。施消防监督检查的情况进行指导和监督。 《机关、团体、企业、事业单位消防安全管理规定》第十三条 《机关、团体、企业、事业单位消防安全管理规定》第十三条 下列范围的单位是消防下列范围的单位是消防安全重点单位,应当按照本规定的要求,实行严格管理:安全重点单位,应当按照本规定的要求,实行严格管理: (一)商场(市场)、宾馆(饭店)、(一)商场(市场)、宾馆(饭店)、体育场(馆)、会堂、公共娱乐场所等公众聚集场所(以下统称公众聚集场所);体育场(馆)、会堂、公共娱乐场所等公众聚集场所(以下统称公众聚集场所);…… 《安徽省消防安全重点单位界定标准》 《安徽省消防安全重点单位界定标准》一、商场(市场)、宾馆(饭店)、体育场(馆)、一、商场(市场)、宾馆(饭店)、体育场(馆)、会堂、公共娱乐场所等公众聚集场所(一)建筑面积在会堂、公共娱乐场所等公众聚集场所(一)建筑面积在10001000平方米(含本数,下同)以上平方米(含本数,下同)以上县经营可燃商品的商县经营可燃商品的商场(商店、市场);场(商店、市场);…… 《关于印发淮南市公安局直属及派出机构主要职责内设机构和人员编制规定的通知》 《关于印发淮南市公安局直属及派出机构主要职责内设机构和人员编制规定的通知》明明确确各分局主要职责各分局主要职责,开展“防特、防盗、防火、防治安灾害事故”;,开展“防特、防盗、防火、防治安灾害事故”;…… 《关于印发全区“家庭式商铺(作坊)”消防安全专项整治行动方案的通知》 《关于印发全区“家庭式商铺(作坊)”消防安全专项整治行动方案的通知》明确提出明确提出加强组织领导,周密部署等要求。加强组织领导,周密部署等要求。 ( (22))淮南经开区振兴路派出所,未按照《安全生产法》淮南经开区振兴路派出所,未按照《安全生产法》第六十二条第第六十二条第11款、《消防法》第五十三条第款、《消防法》第五十三条第11款、《消防监款、《消防监督检查规定》第四条第督检查规定》第四条第22款、《淮南市消防条例》第十四条、款、《淮南市消防条例》第十四条、《关于印发全区“家庭式商铺(作坊)”消防安全专项整治《关于印发全区“家庭式商铺(作坊)”消防安全专项整治行动方案的通知》等有关规定,认真行动方案的通知》等有关规定,认真配合公安消防机构共同配合公安消防机构共同做好辖区内消防监督工作。做好辖区内消防监督工作。○○注注 ———————————— ———————————————————————— ○ ○注注《安全生产法》第六十二条《安全生产法》第六十二条 安全生产监督管理部门和其他负有安全生产监督管理职安全生产监督管理部门和其他负有安全生产监督管理职责的部门依法开展安全生产行政执法工作,对生产经营单位执行有关安全生产的法律、法规责的部门依法开展安全生产行政执法工作,对生产经营单位执行有关安全生产的法律、法规和国家标准或者行业标准的情况进行监督检查,行使以下职权:(一)进和国家标准或者行业标准的情况进行监督检查,行使以下职权:(一)进入生产经营单位进入生产经营单位进行检查,调阅有关资料,向有关单位和人员了解情况行检查,调阅有关资料,向有关单位和人员了解情况;;…….. 《消防法》第五十三条 《消防法》第五十三条 公安机关消防机构应当对机关、团体、企业、事业等单位遵公安机关消防机构应当对机关、团体、企业、事业等单位遵守守消防法律、法规的情况依法进行监督检查。消防法律、法规的情况依法进行监督检查。 《消防监督检查规定》第四条 《消防监督检查规定》第四条第第22款款 公安机关消防机构应当与公安派出所共同做好辖公安机关消防机构应当与公安派出所共同做好辖区消防监督工作区消防监督工作…… 《关于印发全区“家庭式商铺(作坊)”消防安全 《关于印发全区“家庭式商铺(作坊)”消防安全专项整治行动方案的通知》明确的对专项整治行动方案的通知》明确的对 辖区内 辖区内“家庭式商铺(作坊)”“家庭式商铺(作坊)”进行划片摸排登记,督促消除火灾隐患等职责。进行划片摸排登记,督促消除火灾隐患等职责。 ( (33)淮南经开区消防大队,未按照)淮南经开区消防大队,未按照《安全生产法》第六《安全生产法》第六十二条第十二条第11款、《消防法》第五十三条第款、《消防法》第五十三条第11款、《消防监督检款、《消防监督检查规定》第四条、《机关、团体、企业、事业单位消防安全查规定》第四条、《机关、团体、企业、事业单位消防安全管理规定》第十三条第管理规定》第十三条第11款、款、《关于印发安徽省公《关于印发安徽省公安派出所安派出所消防监督检查规定和安徽省派出所日常消防监督检查单位消防监督检查规定和安徽省派出所日常消防监督检查单位界定标准的通知》第一条第界定标准的通知》第一条第11款、款、《安徽省消防安全重点单《安徽省消防安全重点单位界定标准》第一条第位界定标准》第一条第11款、《关于印发武警淮南市消防支款、《关于印发武警淮南市消防支队大(中)队工作职责、权限暂行管理规定(政工、战训部队大(中)队工作职责、权限暂行管理规定(政工、战训部门)的通知》门)的通知》明确的职责明确的职责、、《关于印发全区“家庭式商铺(作《关于印发全区“家庭式商铺(作坊)”消防安全专项整治行动方案的通知》等有关规定,坊)”消防安全专项整治行动方案的通知》等有关规定,将将“国际汽配城”列入“国际汽配城”列入20162016年度消防安全重点单位,年度消防安全重点单位,认真认真组组织开展消防宣传教育和安全检查,督促整改火灾隐患。织开展消防宣传教育和安全检查,督促整改火灾隐患。○○注注 ————— ————— ○ ○注注《安全生产《安全生产法》第六十二条法》第六十二条 安全生产监督管理部门和其他负有安全生产监督管理职安全生产监督管理部门和其他负有安全生产监督管理职责的部门依法开展安全生产行政执法工作,对生产经营单位执行有关安全生产的法律、法规责的部门依法开展安全生产行政执法工作,对生产经营单位执行有关安全生产的法律、法规和国家标准或者行业标准的情况进行监督检查,行使以下职权:(一)进和国家标准或者行业标准的情况进行监督检查,行使以下职权:(一)进入生产经营单位进入生产经营单位进行检查,调阅有关资料,向有关单位和人员了解情况行检查,调阅有关资料,向有关单位和人员了解情况;;…….. 《消防法》第五十三条 《消防法》第五十三条 公安机关消防机构应当对机关、团体、企业、事业等单位遵守公安机关消防机构应当对机关、团体、企业、事业等单位遵守消防法律、法规的情况依法进行监督检查。消防法律、法规的情况依法进行监督检查。 《消防监督检查规定》第四条 《消防监督检查规定》第四条 上级公安机关消防机构应当对下级公安机关消防机构实上级公安机关消防机构应当对下级公安机关消防机构实施消防监督检查的情况进行指导和监督施消防监督检查的情况进行指导和监督。。 公 公安机关消防机构应当与公安派出所共同做好辖区消防监督工作,并对公安派出所开展安机关消防机构应当与公安派出所共同做好辖区消防监督工作,并对公安派出所开展日常消防监督检查工作进行指导,定期对公安派出所民警进行消防监督业务培训日常消防监督检查工作进行指导,定期对公安派出所民警进行消防监督业务培训…… 《机关、团体、企业、事业单位消防安全管理规定》第十三条 《机关、团体、企业、事业单位消防安全管理规定》第十三条 下列范围的单位是消防下列范围的单位是消防安全重点单位,应当按照本规定的要求,实行严格管理:安全重点单位,应当按照本规定的要求,实行严格管理: (一)商场(市场)、宾馆(饭店)、(一)商场(市场)、宾馆(饭店)、体育场(馆)、会堂、公共娱乐场所等公众聚集场所(以下统称公众聚集场所);体育场(馆)、会堂、公共娱乐场所等公众聚集场所(以下统称公众聚集场所);…… 《关于印发安徽省公安派出所消防监督检查规定和安徽省派出所日常消防监督检查单 《关于印发安徽省公安派出所消防监督检查规定和安徽省派出所日常消防监督检查单位界定标准的通知》位界定标准的通知》中界定公安派出所日常消防监督检查中界定公安派出所日常消防监督检查单位(场所)如下:单位(场所)如下:商场(市场)、商场(市场)、宾馆(饭店宾馆(饭店、招待所、招待所)、公共娱乐场所等公众聚集场所)、公共娱乐场所等公众聚集场所(一)建筑面积小于(一)建筑面积小于10001000平方米县经平方米县经营可燃商品的商场(商店、市场);营可燃商品的商场(商店、市场);…… 《安徽省消防安全重点单位界定标准》 《安徽省消防安全重点单位界定标准》一、商场(市场)、宾馆(饭店)、体育场(馆)、一、商场(市场)、宾馆(饭店)、体育场(馆)、会堂、公共娱乐场所等公众聚集场所(一)建筑面积在会堂、公共娱乐场所等公众聚集场所(一)建筑面积在10001000平方米(含本数,下同)以上平方米(含本数,下同)以上县经营可燃商品的商场(商店、市场);县经营可燃商品的商场(商店、市场);…… 《关于印发武警淮南市消防支队大(中)队工作职责、权限暂行规定管理规定(政工、 《关于印发武警淮南市消防支队大(中)队工作职责、权限暂行规定管理规定(政工、战训部门)的通知》明确的战训部门)的通知》明确的消防大队消防大队职责职责第三条第三条 组织开展消防宣传教育和消防安全检查,组织开展消防宣传教育和消防安全检查,督督促整改火险隐患。促整改火险隐患。 《关于印发全区“家庭式商铺(作坊)”消防安全专项整治行动方案的通知》 《关于印发全区“家庭式商铺(作坊)”消防安全专项整治行动方案的通知》,按照“三,按照“三清查、三落实”要求,认真开展火灾隐患专项整治工作。清查、三落实”要求,认真开展火灾隐患专项整治工作。 ( (44)“)“淮南经开区淮南经开区”工委、管委会”工委、管委会,未全面认真贯彻党,未全面认真贯彻党 的安全生产方针政策和国家安全生产等法律法规 的安全生产方针政策和国家安全生产等法律法规,对辖区内,对辖区内招商引资项目招商引资项目安全生产等方面存在的问题失察失管。安全生产等方面存在的问题失察失管。
(六)淮南市交通运输局大通分局(运管所)。
(六)淮南市交通运输局大通分局(运管所)。未按照未按照《安全生产法》第六十二条第《安全生产法》第六十二条第11款、款、《道路运输条例》第五《道路运输条例》第五十九条十九条、《机动车维修管理规定》第八条有关内容和第四十、《机动车维修管理规定》第八条有关内容和第四十九条九条第第11款款、《关于市公路运输管理处内设机构和人员编制、《关于市公路运输管理处内设机构和人员编制等有关问题等有关问题的批复》中明确的下属机构职责规定、淮南市大的批复》中明确的下属机构职责规定、淮南市大通区政府办公室印发《关于开展全区安全生产“铸安”行动通区政府办公室印发《关于开展全区安全生产“铸安”行动的通知》工作部署等,认真开展辖区内的通知》工作部署等,认真开展辖区内非法非法从事机动车维修从事机动车维修经营经营活动“打非治违”工作,活动“打非治违”工作,严肃查处取缔管辖区内事故单严肃查处取缔管辖区内事故单位自位自20142014年年1212月至事发时月至事发时的非法经营行为。的非法经营行为。○○注注
————— ——————————————————————————————————————————————————————— ○ ○注注《安全生产法》第六十二条《安全生产法》第六十二条 安全生产监督管理部门和其他负有安全生产监督管理职安全生产监督管理部门和其他负有安全生产监督管理职责的部门依法开展安全生产行政执法工作,对生产经营单位执行有关安全生责的部门依法开展安全生产行政执法工作,对生产经营单位执行有关安全生产的法律、法规产的法律、法规和国家标准或者行业标准的情况进行监督检查,行使以下职权:(一)进和国家标准或者行业标准的情况进行监督检查,行使以下职权:(一)进入生产经营单位进入生产经营单位进行检查,调阅有关资料,向有关单位和人员了解情况行检查,调阅有关资料,向有关单位和人员了解情况;;…….. 《道路运输条例》第五十九条 《道路运输条例》第五十九条 道路运输管理机构的工作人员应当严格按照职责权限和道路运输管理机构的工作人员应当严格按照职责权限和程序进行监督检查,不得乱设卡、乱收费、乱罚款。程序进行监督检查,不得乱设卡、乱收费、乱罚款。 道路运输管理机构的工作人员应当重点在道路运输及相关业务经营场所、客货集散地进 道路运输管理机构的工作人员应当重点在道路运输及相关业务经营场所、客货集散地进行监督检查。行监督检查。 《机动车维修管理规定》 《机动车维修管理规定》 第八条第八条 三类其他机动车维修经营业务许可的,可以分别从事三类其他机动车维修经营业务许可的,可以分别从事自动变速器维修自动变速器维修等汽车专项维修工作。等汽车专项维修工作。 《机动车维修管理规定》 《机动车维修管理规定》 第四十九条违第四十九条违反本规定,有下列行为之一,擅自从事机动车反本规定,有下列行为之一,擅自从事机动车维修相关经营活动的,由县级以上道路运输管理机构责令其停止经营维修相关经营活动的,由县级以上道路运输管理机构责令其停止经营;;有违法所得的,没收有违法所得的,没收违法所得,处违法所得违法所得,处违法所得22倍以上倍以上1010倍以下的罚款倍以下的罚款;;没有违法所得或者违法所得不足没有违法所得或者违法所得不足11万元的,万元的,处处22万元以上万元以上55万元以下的罚款万元以下的罚款;;构成犯罪的,依法追究刑事责任:构成犯罪的,依法追究刑事责任:((一一))未取得机动车维修经未取得机动车维修经营许可,非法从事机动车维修经营的营许可,非法从事机动车维修经营的…….. 《关于市公路运输管理处内设机构和人员编制等有关问题的批复》 《关于市公路运输管理处内设机构和人员编制等有关问题的批复》下属机构大通交通分下属机构大通交通分局(运管所)职责第四条局(运管所)职责第四条 负责对本辖区从事道路运输经营及道路运输相关业务经营的经营负责对本辖区从事道路运输经营及道路运输相关业务经营的经营者行为实施监督检查;第五条者行为实施监督检查;第五条 完完成上级交办的其他工作。成上级交办的其他工作。 2015 2015年年1111月月,,淮南市大通区人民政府办公室印发《关于开展全区安全生产“铸安”行淮南市大通区人民政府办公室印发《关于开展全区安全生产“铸安”行动的通知》持续开展动的通知》持续开展““打非治违打非治违””,严格执行“四个一律”(对非法生产经营建设和经停产整,严格执行“四个一律”(对非法生产经营建设和经停产整顿仍未达到要求的,一律关闭取缔等)顿仍未达到要求的,一律关闭取缔等)
(七)淮南市
(七)淮南市消防消防支队支队。。未按照《安全生产法》、《消防未按照《安全生产法》、《消防法》和《淮南市消防条例》等有关规定,法》和《淮南市消防条例》等有关规定,全面全面落实党委政府落实党委政府消防工作的部署安排,消防工作的部署安排,认真认真组织、组织、指导开展指导开展辖区辖区商场(市场)商场(市场)等等公众聚集场所监督检查和隐患排查治理公众聚集场所监督检查和隐患排查治理工作工作,,未及时消除未及时消除
事故单位 事故单位存在的安全隐患存在的安全隐患。未按职责对。未按职责对淮南经开区消防大队淮南经开区消防大队工作工作进行指导督促进行指导督促,对其存在的问,对其存在的问题失察。题失察。 综上, 综上,该起事故该起事故是一起企业非法从事是一起企业非法从事安全生产安全生产经营活经营活动,不具备安全生产条件,动,不具备安全生产条件,主体责任不落实,相关主体责任不落实,相关工委、管工委、管委会委会及其有关部门、单位及其有关部门、单位打非治违和打非治违和监管不到位,而造成的监管不到位,而造成的一起较大安全生产责任事故。一起较大安全生产责任事故。
六、 对有关责任单位和责任人的处理建议对有关责任单位和责任人的处理建议
根据事故责任认定,依据有关法律法规和政纪规定,对 根据事故责任认定,依据有关法律法规和政纪规定,对事故有关责任人员和责任单位提出处理意见:事故有关责任人员和责任单位提出处理意见:
(一)建议依法追究刑事责任的人员
(一)建议依法追究刑事责任的人员(2(2人人))。。
1.
- 王小强王小强,,“经营部”经营者,未申请取得生产经营许可,“经营部”经营者,未申请取得生产经营许可,不具备安全生产条件,擅自从事机动车维修等经营业务安全不具备安全生产条件,擅自从事机动车维修等经营业务安全管理极其混乱,对事故发生负有主要责任。其行为涉嫌犯管理极其混乱,对事故发生负有主要责任。其行为涉嫌犯罪,罪,建议移送司法机关依法处理。建议移送司法机关依法处理。
2.
- 宫宇,“经营部”合伙人,与“安徽泉山湖商运公司”宫宇,“经营部”合伙人,与“安徽泉山湖商运公司”签订了《商铺租赁合同》中,明确经营范围为汽车维修,并签订了《商铺租赁合同》中,明确经营范围为汽车维修,并签署了严格遵守国家法律法规,保证守法经营等签署了严格遵守国家法律法规,保证守法经营等1313项承诺,项承诺,同为“经营部”的负责人,对事故发生负有主要责任。其行同为“经营部”的负责人,对事故发生负有主要责任。其行为涉嫌犯罪,建议移送司法机关依法处理。为涉嫌犯罪,建议移送司法机关依法处理。
( (二二))建议给予行政处罚建议给予行政处罚的的人员人员((44人)人)。。
- 汪凤云,“淮南黄埔置业”和“安徽泉山湖商运公司” 两家经营单位决策机构主要负责人,任期内未履行《安全生安全生产法产法》第第十八十八条条规定的规定的职责要求,职责要求,依据《安全生产法》第九十一条第2款、九十二条第2款的规定,建议撤销其“淮南黄埔置业”董事长和总经理职务,并处上一年年收入40%的罚款。。○○注注
————— ————— ○ ○注注《安全生产法》《安全生产法》第十八条第十八条 生产经营单位的主要负责人对本单位安全生产工作负有下生产经营单位的主要负责人对本单位安全生产工作负有下列职责:列职责: ( (一一))建立、健全本单位安全生产责任制建立、健全本单位安全生产责任制;; ( (二二))组织制定本单位安全生产规章制度和操作规程组织制定本单位安全生产规章制度和操作规程;; ( (三三))组织制定并实施本单位安全生产教育和培训计划组织制定并实施本单位安全生产教育和培训计划;; ( (四四))保证本单位安全生产投入的有效实施保证本单位安全生产投入的有效实施;; ( (五五))督促、检查本单位的安全生产工作,及时消除生产安全事故隐患督促、检查本单位的安全生产工作,及时消除生产安全事故隐患;; ( (六六))组织制定并实组织制定并实施本单位的生产安全事故应急救援预案施本单位的生产安全事故应急救援预案;; ( (七七))及时、如实报告生产安全事故。及时、如实报告生产安全事故。 《安全生产法》第九十一条 《安全生产法》第九十一条 生产经营单位的主要负责人未履行本法规定的安全生产管生产经营单位的主要负责人未履行本法规定的安全生产管理职责的,责令限期改正理职责的,责令限期改正;;逾期未改正的,处二万元以上五万元以下的罚款,责令生产经营逾期未改正的,处二万元以上五万元以下的罚款,责令生产经营单位停产停业整顿。单位停产停业整顿。 生产经营单位的主要负责人有前款违法行为,导致发生生产安全事故的,给予撤职处分 生产经营单位的主要负责人有前款违法行为,导致发生生产安全事故的,给予撤职处分;;构成犯罪的,依照刑法有关规定追究刑事责任。构成犯罪的,依照刑法有关规定追究刑事责任。 生产经营单位的主要负责人依照前款规定受刑事处罚或者撤职处分的,自刑罚执行完毕 生产经营单位的主要负责人依照前款规定受刑事处罚或者撤职处分的,自刑罚执行完毕或者受处分之日起,五年内不得担任任何生产经营单位的主要负责人或者受处分之日起,五年内不得担任任何生产经营单位的主要负责人;;对重大、特别重大生对重大、特别重大生产安全事故负有责任的,终身不得担任本行业生产经营单位的主要负责人。产安全事故负有责任的,终身不得担任本行业生产经营单位的主要负责人。 《安全生产法》第九十二条 《安全生产法》第九十二条 生产经营单位的主要负责人未履行本法规定的安全生产管生产经营单位的主要负责人未履行本法规定的安全生产管理职责,导致发生生产安全事故的,由安全生产监督管理部门依照下列规定处以罚款:理职责,导致发生生产安全事故的,由安全生产监督管理部门依照下列规定处以罚款: ( (一一))发生一般事故的,处上一年年收入百分之三十的罚款发生一般事故的,处上一年年收入百分之三十的罚款;; ( (二二))发生较大事故的,处上一年年收入百分之四十的罚款发生较大事故的,处上一年年收入百分之四十的罚款;; ( (三三))发生重大事故的,处上一年年收入百分之六十的罚款发生重大事故的,处上一年年收入百分之六十的罚款;; ( (四四))发生特别重大事故的,处上一年年收入百分之八十的罚款。发生特别重大事故的,处上一年年收入百分之八十的罚款。
2.
- 王冬阳,王冬阳,“淮南黄埔置业”和“安徽泉山湖“淮南黄埔置业”和“安徽泉山湖商运公司”商运公司” 两家经营单位两家经营单位的副总经理,任期内未的副总经理,任期内未履行履行《安全生产法》第《安全生产法》第二十二二十二条第条第55、、66款规定款规定职责要求,违反《安全生产法》第职责要求,违反《安全生产法》第四十六条的规定,四十六条的规定,依据《安全生产法》依据《安全生产法》第一百条,第一百条,建议对其建议对其处以处以1000010000元罚款。元罚款。○○注注
———————————————— ———————————————— ○ ○注注《安全生产法》第二十二条《安全生产法》第二十二条 生产经营单位的安全生产管理机构以及安全生产管理生产经营单位的安全生产管理机构以及安全生产管理人员履行下列职责:人员履行下列职责: ( (一一))组织或者参与拟订本单位安全生产规章制度、操作规程和生产安全事故应急救援预组织或者参与拟订本单位安全生产规章制度、操作规程和生产安全事故应急救援预案案;; ( (二二))组织或者参与本单位安全生产教育和培训,组织或者参与本单位安全生产教育和培训,如实记录安全生产教育和培训情况如实记录安全生产教育和培训情况;; ( (三三))督促落实本单位重大危险源的安全管理措施督促落实本单位重大危险源的安全管理措施;; ( (四四))组织或者参与本单位应急救援演练组织或者参与本单位应急救援演练;; ( (五五))检查本单位的安全生产状况,及时排查生产安全事故隐患,提出改进安全生产管理检查本单位的安全生产状况,及时排查生产安全事故隐患,提出改进安全生产管理的建议的建议;; ( (六六))制止和纠正违章指挥、强令冒险作业、违反操作规程的行为制止和纠正违章指挥、强令冒险作业、违反操作规程的行为;; ( (七七))督促落实本单位安全生产整改措施。督促落实本单位安全生产整改措施。 《安全生产法》 《安全生产法》第四十六条第四十六条 生产经营单位不得将生产经营项目、场所、设备发包或者生产经营单位不得将生产经营项目、场所、设备发包或者出租给不具备安全生产条件或者相应资质的单位或者个人。出租给不具备安全生产条件或者相应资质的单位或者个人。 《安全生产法》 《安全生产法》第一百条第一百条 生产经营单位将生产经营项目、场所、设备发包或生产经营单位将生产经营项目、场所、设备发包或者出租给者出租给不具备安全生产条件或者相应资质的单位或者个人的,责令限期改正,没收违法所得不具备安全生产条件或者相应资质的单位或者个人的,责令限期改正,没收违法所得;;违法违法所得十万元以上的,并处违法所得二倍以上五倍以下的罚款所得十万元以上的,并处违法所得二倍以上五倍以下的罚款;;没有违法所得或者违法所得不没有违法所得或者违法所得不足十万元的,单处或者并处十万元以上二十万元以下的罚款足十万元的,单处或者并处十万元以上二十万元以下的罚款;;对其直接负责的主管人员和其对其直接负责的主管人员和其他直接责任人员处一万元以上二万元以下的罚款他直接责任人员处一万元以上二万元以下的罚款;;导致发生生产安全事故给他人造成损害导致发生生产安全事故给他人造成损害的,与承包方、承租方承担连带赔偿责任。的,与承包方、承租方承担连带赔偿责任。
3.
- 胡俊,胡俊,“安徽南山物管公司”“安徽南山物管公司”法定代表人,法定代表人,决策机构主决策机构主
要负责人 要负责人,,任期内未履行《安全生产法》第十八条任期内未履行《安全生产法》第十八条和第二十和第二十一条第一条第22款规定的职责要求,依据款规定的职责要求,依据《安全生产法《安全生产法》第九十一》第九十一条条第第22款、九十二条第款、九十二条第22款规定,款规定,建议撤销建议撤销“安徽南山物管“安徽南山物管公司”公司”董事长职务,并处上一年年收入董事长职务,并处上一年年收入40%40%的罚款。的罚款。○○注注 ———————————— —————————————————————————————————————————————————————————— ○ ○注注《安全生产法》《安全生产法》第十八条第十八条 生产经营单位的主要负责人对本单位安全生产工作负有下生产经营单位的主要负责人对本单位安全生产工作负有下列职责:列职责: ( (一一))建立、健全本单位安全生产责任制建立、健全本单位安全生产责任制;; ( (二二))组织制定本单位安全生产规章制度和操作规程组织制定本单位安全生产规章制度和操作规程;; ( (三三))组织制定并实施本单位安全生产教育和培训计划组织制定并实施本单位安全生产教育和培训计划;; ( (四四))保证本单位安全生产投入的有效实保证本单位安全生产投入的有效实施施;; ( (五五))督促、检查本单位的安全生产工作,及时消除生产安全事故隐患督促、检查本单位的安全生产工作,及时消除生产安全事故隐患;; ( (六六))组织制定并实施本单位的生产安全事故应急救援预案组织制定并实施本单位的生产安全事故应急救援预案;; ( (七七))及时、如实报告生产安全事故。及时、如实报告生产安全事故。 《安全生产法》第二十一条矿山、金属冶炼、建筑施工、道路运输单位和危险物品的生 《安全生产法》第二十一条矿山、金属冶炼、建筑施工、道路运输单位和危险物品的生产、经营、储存单位,应当设置安全生产管理机构或者配备专职安全生产管理人员。产、经营、储存单位,应当设置安全生产管理机构或者配备专职安全生产管理人员。 前款规定以外的其他生产经营单位,从业人员超过一百人的,应当设置安全生产管理机 前款规定以外的其他生产经营单位,从业人员超过一百人的,应当设置安全生产管理机构或者配备专职安全生产管理人员构或者配备专职安全生产管理人员;;从业人员在一百人以下的,应当配备专职或者兼职的安从业人员在一百人以下的,应当配备专职或者兼职的安全生产管理人员。全生产管理人员。 《安全生产法》第九十二 《安全生产法》第九十二条条 生产经营单位的主要负责人未履行本法规定的安全生产生产经营单位的主要负责人未履行本法规定的安全生产管理职责,导致发生生产安全事故的,由安全生产监督管理部门依照下列规定处以罚款:管理职责,导致发生生产安全事故的,由安全生产监督管理部门依照下列规定处以罚款: ( (一一))发生一般事故的,处上一年年收入百分之三十的罚款发生一般事故的,处上一年年收入百分之三十的罚款;; ( (二二))发生较大事故的,处上一年年收入百分之四十的罚款发生较大事故的,处上一年年收入百分之四十的罚款;; ( (三三))发生重大事故的,处上一年年收入百分之六十的罚款发生重大事故的,处上一年年收入百分之六十的罚款;; ( (四四))发生特别重大事故的,处上一年年收入百分之八十的罚款。发生特别重大事故的,处上一年年收入百分之八十的罚款。
4.
- 周亚,周亚,“安徽南山物管公司台湾项目城服务中心”“安徽南山物管公司台湾项目城服务中心”项目项目经理,经理,该该项目的主要管理人员,项目的主要管理人员,任期内未履行《安全生产法》任期内未履行《安全生产法》第二十二条第第二十二条第55、、66款规定职责要求,违反《款规定职责要求,违反《安全生产法》安全生产法》第四十六条的规定,依据《安全生产违法行为行政处罚办法》第四十六条的规定,依据《安全生产违法行为行政处罚办法》(国家安全监管总局令第(国家安全监管总局令第1515号,国家安全监管总局令号,国家安全监管总局令7777号号修改)第修改)第四十五四十五条,建议对其处以条,建议对其处以70007000元罚款。元罚款。○○注注
————— ——————————————————————————————————————————————————————————————— ○ ○注注《安全生产法》第二十二条《安全生产法》第二十二条 生产经营单位的安全生产管理机构以及安全生产管理生产经营单位的安全生产管理机构以及安全生产管理人员履行下列职责:人员履行下列职责: ( (一一))组织或者参与拟订本单位安全生产规章制度、操作规程和生产安全事故应急救援预组织或者参与拟订本单位安全生产规章制度、操作规程和生产安全事故应急救援预案案;; ( (二二))组织或者参与本单位安全生产组织或者参与本单位安全生产教育和培训,如实记录安全生产教育和培训情况教育和培训,如实记录安全生产教育和培训情况;; ( (三三))督促落实本单位重大危险源的安全管理措施督促落实本单位重大危险源的安全管理措施;; ( (四四))组织或者参与本单位应急救援演练组织或者参与本单位应急救援演练;; ( (五五))检查本单位的安全生产状况,及时排查生产安全事故隐患,提出改进安全生产管理检查本单位的安全生产状况,及时排查生产安全事故隐患,提出改进安全生产管理的建议的建议;; ( (六六))制止和纠正违章指挥、强令冒险作业、违反操作规程的行为制止和纠正违章指挥、强令冒险作业、违反操作规程的行为;; ( (七七))督促落实本单位安全生产整改措施。督促落实本单位安全生产整改措施。 《安全生产法》 《安全生产法》第四十六条第四十六条 生产经营单位不得将生产经营项目、场所、设备发包或者生产经营单位不得将生产经营项目、场所、设备发包或者出租给不具备安全生产条件或者相应资质的单位或者个人。出租给不具备安全生产条件或者相应资质的单位或者个人。 生产经营项目、场所发包或者出租给其他单位的,生产经营单位应 生产经营项目、场所发包或者出租给其他单位的,生产经营单位应当与承包单位、承租当与承包单位、承租单位签订专门的安全生产管理协议,或者在承包合同、租赁合同中约定各自的安全生产管理单位签订专门的安全生产管理协议,或者在承包合同、租赁合同中约定各自的安全生产管理职责职责;;生产经营单位对承包单位、承租单位的安全生产工作统一协调、管理,定期进行安全生产经营单位对承包单位、承租单位的安全生产工作统一协调、管理,定期进行安全检查,发现安全问题的,应当及时督促整改。检查,发现安全问题的,应当及时督促整改。 《安全生产违法行为行政处罚办法》第四十五条 《安全生产违法行为行政处罚办法》第四十五条 生产经营单位及其主要负责人或者其生产经营单位及其主要负责人或者其他人员有下列行为之一的,给予警告,并可以对生产经营单位处他人员有下列行为之一的,给予警告,并可以对生产经营单位处11万元以上万元以上33万元以下罚款,万元以下罚款,对其主要负责人、其他有关人员处对其主要负责人、其他有关人员处10001000元以上元以上11万元以下的罚款:万元以下的罚款:
(一)违反操作规程或者安全管理规定作业的;
(一)违反操作规程或者安全管理规定作业的;
(二)违章指挥从业人员或者
(二)违章指挥从业人员或者强令从业人员违章、冒险作业的;强令从业人员违章、冒险作业的;
(三)发现从业人员违章作业不加制止的;
(三)发现从业人员违章作业不加制止的;
(四)超过核定的生产能力、强度或者定员进行生产的;
(四)超过核定的生产能力、强度或者定员进行生产的;
(五)对被查封或者扣押的设施、设备、器材、危险物品和作业场所,擅自启封或者使
(五)对被查封或者扣押的设施、设备、器材、危险物品和作业场所,擅自启封或者使用的;用的;
(六)故意提供虚假情况或者隐瞒存在的事故隐患以及其他安全问题的;
(六)故意提供虚假情况或者隐瞒存在的事故隐患以及其他安全问题的;
(七)拒不执行安全监管监察部门依法下达的安全监管监察指令的。
(七)拒不执行安全监管监察部门依法下达的安全监管监察指令的。
(三)建议给予政纪处分
(三)建议给予政纪处分的人员的人员((55人)人)。。
- 戚宗善, 淮南经开区经贸发展局局长,主持全面工作,未认真履行安全生产监管职责,对事故单位存在的安全隐患问题失察,对该起事故的发生负重要领导责任。根据《安全生产领域违法违纪行为政纪处分暂行规定》第八条规定,建议给予警告处分。○○注注
———————————— ———————————————— ○ ○注注《安全生产领域违法违纪行为政纪处分暂行规定》安全生产领域违法违纪行为政纪处分暂行规定》第第八八条条::国家行政机关及其公务员国家行政机关及其公务员有下列行为之一的,对有关责任人员,给予警告、记过或者记大过处分;情节较重的,给予有下列行为之一的,对有关责任人员,给予警告、记过或者记大过处分;情节较重的,给予降级或者撤职处分;情节严重的,给予开除处分:降级或者撤职处分;情节严重的,给予开除处分:
(五)对生产安全事故的防范、报告、应急救援有其他失职、渎职行为的。以下建议给
(五)对生产安全事故的防范、报告、应急救援有其他失职、渎职行为的。以下建议给予警告和记过处分的,均引用此条款)予警告和记过处分的,均引用此条款)
- 雷洋,淮南经开区振兴路派出所副所长,分管消防工作,未认真履行消防安全监管职责,未按规定督促检查辖区内消防安全工作,对这起事故的发生负主要领导责任。根据要领导责任。根据《安全生产领域违法违纪行为政纪处分暂行规定》第八条规《安全生产领域违法违纪行为政纪处分暂行规定》第八条规定(同上),建议给予警告处分。定(同上),建议给予警告处分。
3 3..陈广伟,陈广伟,20152015年年1111月任月任淮南经开区消防大队大队长,淮南经开区消防大队大队长,20162016年年1111月调任凤台县消防大队月调任凤台县消防大队大大队长,队长,主管消防业务工主管消防业务工作等,未按规定将“国际汽配城”列入作等,未按规定将“国际汽配城”列入20162016年度消防安全年度消防安全重点单位,认真组织开展消防宣传教育和消防安全检查,督重点单位,认真组织开展消防宣传教育和消防安全检查,督促整改火灾隐患。对这起事故的发生负重要领导责任,依据促整改火灾隐患。对这起事故的发生负重要领导责任,依据 《中国人民解放军 《中国人民解放军纪律条令》第八十九条规定建议给予警告纪律条令》第八十九条规定建议给予警告处分。鉴于该同志系现役军人,由事故调查组移送相关处分。鉴于该同志系现役军人,由事故调查组移送相关材料交相关部门处理。○○注注 ———————————— ○ ○注注《中国人民解放军纪律条令》第八十九条《中国人民解放军纪律条令》第八十九条 因工作失职,造成损失或者不良影响,因工作失职,造成损失或者不良影响,情节较轻的,给予警告、严重警告处分;以下建议给予警告和记过处分的,均引用此条款情节较轻的,给予警告、严重警告处分;以下建议给予警告和记过处分的,均引用此条款 4 4..王东,淮南经开王东,淮南经开区公安分局区公安分局副局长副局长,,分管消防分管消防等等工作,工作,联系联系振兴路派出所振兴路派出所,,未按未按规定将“国际汽配城”列入规定将“国际汽配城”列入20162016年度年度消防安全重点单位消防安全重点单位,认真组织、指导和督促,认真组织、指导和督促相关机关和相关机关和企业企业开展消防安全工作,开展消防安全工作,对这起事故的发生负主要领导责任,根据《安全生产领域违法违纪行为政纪处分暂行规定》第八条规定(同上),建议给予警告处分。 5 5..沈辉沈辉,,淮南市交通运输局大通分局(运管所)淮南市交通运输局大通分局(运管所)局长(所局长(所长),主持全面工作,长),主持全面工作,未按照未按照有关规定,认真开展辖区内有关规定,认真开展辖区内非非法法从事机动车维修从事机动车维修经营经营活动“打非治违”工作,未严肃查处活动“打非治违”工作,未严肃查处取缔管辖区内事故单位自取缔管辖区内事故单位自20142014年年1212月至事发时月至事发时非法经营行非法经营行为,对该起事故负有重要领导责任。为,对该起事故负有重要领导责任。根据《安全生产领域违根据《安全生产领域违法违纪行为政纪处分暂行规定》第八条规定(同上),建议法违纪行为政纪处分暂行规定》第八条规定(同上),建议给予警告处分。给予警告处分。
(四)建议给予
(四)建议给予诫勉谈话诫勉谈话或或批评教育批评教育的人员的人员((44人)人)。。
1 1..程金宝,淮南市工商局经开区分局局长,主持全面工程金宝,淮南市工商局经开区分局局长,主持全面工作,未认真组织开展安全生产监督检查,未及时发现事故单作,未认真组织开展安全生产监督检查,未及时发现事故单位非法从事汽车维修经营业务并将违法事实通报相关审批位非法从事汽车维修经营业务并将违法事实通报相关审批部门,对该起事故的发生负部门,对该起事故的发生负领导责任领导责任,建议给予,建议给予诫勉谈话诫勉谈话。。 2 2..徐少武,淮南经开区振兴路派出所所长,主持全面工徐少武,淮南经开区振兴路派出所所长,主持全面工作,未按规定组织、指导和督促相关人员开展辖区内消防安作,未按规定组织、指导和督促相关人员开展辖区内消防安 全工作,对这起事故的发生负 全工作,对这起事故的发生负领导责任领导责任,建议给予诫勉谈话。,建议给予诫勉谈话。 3 3..朱玉波,淮南经开朱玉波,淮南经开区公安分局区公安分局局长局长,,主持全面工作,主持全面工作,对淮南对淮南经开区经开区公安分局未按规定消除公安分局未按规定消除“经营部”“经营部”消防安消防安全隐全隐患问题失察,对事故发生负有领导责任,建患问题失察,对事故发生负有领导责任,建议给予议给予批评教育批评教育。。 4 4..胡涛,胡涛,“淮南经开区”管委会“淮南经开区”管委会副主任,分管经贸发展副主任,分管经贸发展、、消防等工作消防等工作,对,对经贸发展局和经经贸发展局和经开区消防大队未按规定消除开区消防大队未按规定消除“经营部”消防安全隐患问题失察,对事故发生负有领导责“经营部”消防安全隐患问题失察,对事故发生负有领导责任,任,建议给予建议给予批评教育批评教育。。
(五)建议给予行政处罚的单位
(五)建议给予行政处罚的单位((22个)个)。。
1.
- “安徽泉山湖商运公司”,存在多项违反《安全生产法》“安徽泉山湖商运公司”,存在多项违反《安全生产法》行为,是事故责任单位,依照《安全生产法》第一百零九条行为,是事故责任单位,依照《安全生产法》第一百零九条规定,建议给予其规定,建议给予其99.999.9万元行政罚款。万元行政罚款。○○注注
———————————————————————————— ———————————————————————————— ○ ○注注《安全《安全生产法》第一百条生产法》第一百条 生产经营单位将生产经营项目、场所、设备发包或者出生产经营单位将生产经营项目、场所、设备发包或者出租给不具备安全生产条件或者相应资质的单位或者个人的,责令限期改正,没收违法所得租给不具备安全生产条件或者相应资质的单位或者个人的,责令限期改正,没收违法所得;;违法所得十万元以上的,并处违法所得二倍以上五倍以下的罚款违法所得十万元以上的,并处违法所得二倍以上五倍以下的罚款;;没有违法所得或者违法所没有违法所得或者违法所得不足十万元的,单处或者并处十万元以上二十万元以下的罚款得不足十万元的,单处或者并处十万元以上二十万元以下的罚款;;对其直接负责的主管人员对其直接负责的主管人员和其他直接责任人员处一万元以上二万元以下的罚款和其他直接责任人员处一万元以上二万元以下的罚款;;导致发生生产安全事故给他人造成损导致发生生产安全事故给他人造成损害的,与承包方、承租方承担连带赔偿责任。害的,与承包方、承租方承担连带赔偿责任。 生产经营单位未与承包单位、承租单位签订专门的安全生产管理协议或者未在承包合 生产经营单位未与承包单位、承租单位签订专门的安全生产管理协议或者未在承包合同、租赁同、租赁合同中明确各自的安全生产管理职责,或者未对承包单位、承租单位的安全生产统合同中明确各自的安全生产管理职责,或者未对承包单位、承租单位的安全生产统一协调、管理的,责令限期改正,可以处五万元以下的罚款,对其直接负责的主管人员和其一协调、管理的,责令限期改正,可以处五万元以下的罚款,对其直接负责的主管人员和其他直接责任人员可以处一万元以下的罚款他直接责任人员可以处一万元以下的罚款;;逾期未改正的,责令停产停业整顿。逾期未改正的,责令停产停业整顿。 《安全生产法》 《安全生产法》第一百零九条第一百零九条 发生生产安全事故,对负有责任的生产经营单位除要求发生生产安全事故,对负有责任的生产经营单位除要求其依法承担相应的赔偿等责任外,由安全生产监督管理部门依照下列规定处以罚款:其依法承担相应的赔偿等责任外,由安全生产监督管理部门依照下列规定处以罚款:
(一)发生一般事故的,处二十万元以上五十万元以下的罚款;
(一)发生一般事故的,处二十万元以上五十万元以下的罚款;
(二)发生较大事故的,处五十万元以上一百万元以下的罚款;
(二)发生较大事故的,处五十万元以上一百万元以下的罚款;
(三)发生重大事故的
(三)发生重大事故的,处一百万元以上五百万元以下的罚款;,处一百万元以上五百万元以下的罚款;
(四)发生特别重大事故的,处五百万元以上一千万元以下的罚款;情节特别严重的,
(四)发生特别重大事故的,处五百万元以上一千万元以下的罚款;情节特别严重的,处一千万元以上二千万元以下的罚款。处一千万元以上二千万元以下的罚款。””
2.
- “安徽南山物管公司”,违反了《安全生产法》第九十“安徽南山物管公司”,违反了《安全生产法》第九十四条第四条第11、、66款行为,依照该条款规定,建议给予其款行为,依照该条款规定,建议给予其4.994.99万万元行政罚款。元行政罚款。○○注注
—————————— —————————— ○ ○注注《安全生产法》第九十四条《安全生产法》第九十四条 生产经营单位有下列行为之一的,责令限期改正,可生产经营单位有下列行为之一的,责令限期改正,可以处五万元以下的罚款以处五万元以下的罚款;;逾期未改正的,责令停产停业整顿,并处五万元以上十万元以下逾期未改正的,责令停产停业整顿,并处五万元以上十万元以下的的罚款,对其直接负责的主管人员和其他直接责任人员处一万元以上二万元以下的罚款:罚款,对其直接负责的主管人员和其他直接责任人员处一万元以上二万元以下的罚款: ( (一一))未按照规定设置安全生产管理机构或者配备安全生产管理人员的未按照规定设置安全生产管理机构或者配备安全生产管理人员的;; ( (二二))危险物品的生产、经营、储存单位以及矿山、金属冶炼、建筑施工、道路运输单位危险物品的生产、经营、储存单位以及矿山、金属冶炼、建筑施工、道路运输单位的主要负责人和安全生产管理人员未按照规定经考核合格的的主要负责人和安全生产管理人员未按照规定经考核合格的;; ( (三三))未按照规定对从业人员、被派遣劳动者、实习学生进行安全生产教育和培训,或者未按照规定对从业人员、被派遣劳动者、实习学生进行安全生产教育和培训,或者未按照规定如实告知有关的安全生产事项的未按照规定如实告知有关的安全生产事项的;; ( (四四))未如实记录安全生产教育和培训情况的未如实记录安全生产教育和培训情况的;; ( (五五))未将事故隐患排查治理情况如实记录或者未向从业人员通报的未将事故隐患排查治理情况如实记录或者未向从业人员通报的;; ( (六六))未按照规定制定生产安全事故应急救援预案或者未定期组织演练的未按照规定制定生产安全事故应急救援预案或者未定期组织演练的;; ( (七七))特种作业人员未按照规定经专门的安全作业培训并取得相应资格,上岗作业的。特种作业人员未按照规定经专门的安全作业培训并取得相应资格,上岗作业的。
(六)建议相关行政问责的单位。
- “淮南经开区”经贸发展局、淮南经开区公安分局负有指导、督促和检查辖区内相关部门开展消防安全监督和依法依规经营职责,对该起事故负有重要责任,责成以上部门向“淮南经开区”管委会作出深刻书面检查。
- 淮南市消防支队经开区大队负有组织、指导和督促辖区内相关部门开展消防安全监督检查职责,对该起事故负有重要责任,责成其向淮南市消防支队作出深刻书面检查。
- “淮南经开区”管委会负有领导、督促和检查辖区内消防安全职责,对该起事故负有重要责任,责成其向淮南市人民政府作出深刻的书面检查。
七、事故防范措施建议
(一)淮南
(一)淮南市要市要深入贯彻落实习近平总书记关于加强安深入贯彻落实习近平总书记关于加强安全生产系列重要批示精神,全生产系列重要批示精神,进一步强化进一步强化“党政同责、一岗双责、齐抓共管、失职追责”和“管行业必须管安全、管业务必须管安全、管生产经营必须管安全”和按照“谁主管、谁负责”、按照“谁主管、谁负责”、“谁审批、谁负责”的原则,“谁审批、谁负责”的原则,建立健全安全责任制度,全面落实党委、政府、部门和个人的安全管理责任。要完善安全生产工作责任目标考核机制,强化地方各级人民政府和各有关部门安全生产职责落实,大力推进安全生产形势持续稳定好转。
(二)淮南市要结合全省持续开展的“严执法、排隐患、强管理”为主要内容的“安全生产铸安”行动,按照职责分工,在全市范围内对机动车维修经营场所,深入开展摸排登记,建立“一户一档”,做到横向到边,纵向到底、不留死角,确保底数清,情况明,台账准,逐户登记。对非法从事机动车维修经营行为,严格落实 “四个一律”要求,坚决依法纠正,从严从重查处,有效防范和坚决遏制非法违规行为导致的安全事故,切实维护人民群众生命财产安全。
(三)淮南市要建立并实施安全生产风险查找、研判、预警、防范、处置、责任“六项机制”,大力推进风险分级管控和隐患排查治理双重预防性体系建设,并结合正在部署开展的“电气火灾综合治理工作”,全面开展电器产品使用管理领域综合治理,强化安全生产风险管控,认真组织开展大型市场内集经营、储存、住宿为一体的“三合一”生产经营场所安全隐患大排查,对问题和隐患列出清单、建立台账、明确责任、限期整改。同时要不断加强“三合一”生产经营场所消防信息化技术水平建设,鼓励推广此类场所使用技防设施,要加强社会化消防安全宣传教育培训,尤其是普及全民消防法律法规及扑救初起火灾、疏散逃生等消防技能,着力提升群众消防安全综合素质,有效防范火灾事故发生,确保人民生命财产安全和社会稳定。
(四)淮南市要强化招商引资项目运营单位和物业管理企业的管理,要要以以本次事故及其暴露出的本次事故及其暴露出的问题为导向,问题为导向,牢固牢固树立红线意识和底线思维,树立红线意识和底线思维,严格严格按照按照项目规划批准的项目规划批准的经营范经营范围组织运营,围组织运营,严格租赁市场安全管理,尤其是对严格租赁市场安全管理,尤其是对需要许可的需要许可的
经营行为 经营行为,要依法依规严格审查,杜绝将经营场所租赁给不,要依法依规严格审查,杜绝将经营场所租赁给不具备安全生产条件的经营户从事非法经营。具备安全生产条件的经营户从事非法经营。同时物业管理企同时物业管理企业要业要将将经营户经营户纳入企业安全管理范畴,建立健全覆盖企业生纳入企业安全管理范畴,建立健全覆盖企业生产经营全过程、全方位的安全产经营全过程、全方位的安全责任体系,依法设置专职安全责任体系,依法设置专职安全机构、配备专职安全人员,全面开展机构、配备专职安全人员,全面开展事故事故隐患排查整治、安隐患排查整治、安全教育和应急处置培训等工作全教育和应急处置培训等工作,,确保确保市场市场安全营运。安全营运。
FD06172 | 2018_台湾_中油桃園煉油廠氣爆火警_監察院糾正案文.pdf
分类:06_境外及港澳台调查报告 | 年份:2018 | 地域:台湾 | 严重程度: | 场所: | 起火原因:燃气/爆炸 | 来源格式:pdf
1 糾 正 案 文 壹、被糾正機關:經濟部及台灣中油股份有限公司。 貳、案 由:台灣中油股份有限公司桃園煉油廠於第二 柴油加氫脫硫工場歲修開爐作業操作不 當,引發氣爆及火警事件,損失金額高達 新臺幣6億元以上,更引發周遭居民恐 慌,且該工場管線有材質誤用情事,確有 怠失;經濟部督導不周,亦有未當。復該 工場加熱爐未經檢查合格開爐啟用,該公 司長期以來未依法辦理,核有違失,爰依 法提案糾正。 參、事實與理由: 本案緣於台灣中油股份有限公司(下稱中油公司) 煉製事業部桃園廠(即桃園煉油廠)第二柴油加氫脫硫 工場於民國(下同)107年3月7日清晨發生爆炸並引發大 火事件,造成周遭居民恐慌。案經調閱經濟部、勞動部 及桃園市政府等機關卷證資料,並於民國(下同)107 年3月7日履勘桃園煉油廠第二柴油加氫脫硫工場,並聽 取中油公司及桃園煉油廠、勞動部職業安全衛生署(下 稱職安署)北區職業安全衛生中心(下稱北區中心)、桃 園市政府消防局、經濟發展局、勞動檢查處及環境保護 局等機關簡報,嗣於107年5月17日諮詢專家學者,並於 107年7月9日詢問經濟部國營事業委員會(下稱國營 會)、中油公司及桃園煉油廠、職安署及北區中心、桃園 市政府等機關相關人員,調查發現本案中油公司桃園煉 油廠於第二柴油加氫脫硫工場歲修開爐作業操作不當, 且危險性設備未經檢查合格竟開爐啟用,確有違失;經 濟部督導不周,亦有未當,均應予糾正促其注意改善。 茲臚列事實與理由如下:
2 一、中油公司桃園煉油廠於第二柴油加氫脫硫工場歲修 開爐作業操作不當,肇生107年1月29日之氣爆及火警 事件,損失金額高達新臺幣6億元以上,更引發周遭 居民恐慌,確有怠失,尤有甚者,本事件發現該工場 管線有材質誤用情事,突顯桃園煉油廠之工業及公共 安全疑慮亟待改進;經濟部督導不周,亦有未當。 (一)依中油公司桃園煉油廠為使工作人員瞭解第二柴油 加氫脫硫工場開停爐的過程與步驟,以使操作人員 對開、停爐的步驟有所依據,該廠煉製一組訂有「第 二柴油加氫脫硫工場開停爐工作指導書」,依其開 爐步驟所載,須就控制閥開度作動測試1,因機械故 障(如進料泵、循環氣壓縮機等)、公用物料、洩 漏、火災等因素而須緊急停爐,避免設備或觸媒受 到損害,並規範應降低出口溫度、燃料關斷、爐管 溫度驟升時為必要的處理等2。是以,於開爐程序中 應隨時注意各系統設備狀況,於異常狀況處理作業 流程之相關事件排除及緊急應變處置業已規範於 各處理程序之相關注意事項,並於必要時須緊急停 爐,以避免工安事故之發生。 (二)查桃園煉油廠第二柴油加氫脫硫工場自106年12月 1 5.1開爐步驟:5.1.2控制閥開度作動測試:通知公用組,本場引進動力空氣及儀器空氣後, 各控制器應作0%/25%/50%75%/100%之開度測試及查核DCS(Distributed Control System, 分散式控制系統)控制迴路細貎畫面內DDP9、DDP10之狀態,測試結果並留存記錄,作為 維修校正之參考。5.2 柴油脫硫區開爐步驟:5.2.4 各控制閥(含XV)開度、作動之測試。 2 5.4 柴油脫硫區緊急停爐:引起緊急停爐的原因,可能是由於機械故障導致製程因素、公用 物料(如:動力、燃料、蒸汽、……等)的中斷,或由於嚴重洩漏,或由於火災。在這些狀 況下,一部分或整個工場必須儘快停爐,以避免設備或觸媒受到損害。5.4.1 進料泵(P-101 或P-102)故障:……2)如果備用泵無法正常運轉,進料中斷時,即按照下列步驟處理:……(2) 降低F-101出口溫度(TC-1021)至250℃(必要時可切熄部份爐火)。TC-1011改手動緩慢關小 至5%左右。5.4.3 循環氣壓縮機(C-101A/B)故障:C-101因馬達發生故障,或本身跳俥因 素(高高振動、進口緩衝槽高高液面、滑油低低壓力、進口低低壓力、出口高高溫度、滑油 冷卻水低低流量、汽缸溫水低低流量),造成連鎖系統作動停俥,此時FSLL-1007/1008亦會 連鎖作動並使P-102停泵,F-101切斷燃料。……2)F-101燃料關斷……。5.4.6 儀器空氣中 斷:……3)特別注意R-101媒床與F-101爐管之溫度,如果溫度驟升,則做必要的處理。緩 慢由FV-1018的BY-PASS閥調整釋壓……。
3 25日開始進行大修工作,維修作業於107年1月26日 結束,工場於1月29日開爐,惟開爐前未確認熱分 離槽D-102出口之液位控制閥LV-1005是否能正常 作動(控制閥LV-1005於開爐前相關例行檢查時曾發 現有作動異常情形發生),致造成相關儲槽滿溢, 胺液因雜質進入而發泡,導致硫化氫處理程序不完 全有環保空污洩漏之虞,相關處理設備因而自動停 俥,桃園煉油廠因無相關緊急處理程序,操作人員 未能查知加熱爐在氫氣無進料下持續加熱之影 響,致F101加熱爐出口12吋管線因過熱而氣爆火 災。中油公司表示當時操作同仁因製程異常而忙於 處理警報,加上操作同仁專注於處理硫磺工場冒煙 事件,未能及時留意F-101出口溫度急速上昇,且加 熱爐F-101出口未設計管線高高溫跳俥安全連鎖保 護,亦未完全掌握製程潛在危害及可能造成關連性 之嚴重後果所致。此有中油公司提出氣爆火警事件 調查報告、北區中心107年3月1日提出初步原因報 告,在卷可稽。 (三)復依經濟部於107年2月6日提出「0129中油桃廠事故 行政調查專案報告」、桃園煉油廠提供卷證資料, 開爐過程因循環壓縮機C101跳俥,控制室遂於5時 20分將反應器進料泵P102B停俥,嗣後加熱爐F101 於5時32分燃料氣由570Nm3/hr關至260Nm3/hr,之後 加熱爐出口管線溫度上升,至氣爆發生前快速上 升,加熱爐出口B管線溫度於6時30分至6時40分再 上升至962℃。依加熱爐出口12吋管線材質初步估 計於60kg/cm2g、650℃下之潛變破裂壽命約1小時, 650℃約10分鐘破裂。依該專案報告指出,進料泵 P102B停俥時未將加熱爐F101爐火完全關斷,致使 加熱爐出口管線溫度異常昇溫研判超過管線容許
4 極限造成管線破裂,另在循環壓縮機C101故障(跳 俥)時未依指導書相關規範精神停止送料、關斷燃 料。可證桃園煉油廠於斯時開爐作業時之操作員工 未依前述指導書規範作業,為本事故發生因素之 一。 (四)續以,北區中心指出,本次事故主因為熱分離槽 D-102出口之液位控制閥LV-1005未能正常作動,致 造成相關儲槽滿溢而釀災,事故發生時作業人員嘗 試用手動開啟多次,皆未能成功,表示在歲修後該 控制閥之堪用度與安全性皆未能維持在正常狀 態,可見中油公司於該工場歲修後各設備元件之可 用度與安全性判定之準則未能落實。再者,中油公 司提供該控制閥於大修期間之檢修行程中,曾於 1月22日3及1月27日4二度發生異常,於1月29日再次 發生異常全關後釀成本次事故,事後中油公司針對 該控制閥進行檢測並研判故障原因為控制閥定位 器不作動,定位器噴嘴細小微粒堵塞,造成閥自動 關閉,將螺絲微鬆脫,定位器即恢復正常等云云。 是以,本次大修期間異常情形時即落實控制閥定位 器儀器空氣調壓閥拆、清檢查或更新等,當可排除 該控制閥發生故障。 (五)再者,經濟部及中油公司於本院詢問前查復,故障 發生於凌晨4點多,現場僅有人力2人,當控制閥故 障關閉,正常處置應打開控制閥LV-1005旁路閥3顆 (高低壓界限閥,壓差極大),再洽維修人員檢修, 但因情況緊急,凌晨維修人員難於及時抵達檢修, 又現場值班人員忙於處理大量警報事項,以及煙囪 冒黑煙環保事件,故改開LV-1008(D-103槽)旁路 3 1月22日:開爐前現場測試,作動正常,現場人員懷疑會關不死,維修處理。 4 1月27日:觸媒硫化濕潤時發生異常全關,及時請廠商緊急處理,恢復正常。
5 閥排放,但因管線較小排放不及,造成滿溢;若及 時排除LV-1005控制閥故障,油路不被堵塞,應不致 於產生一連串滿溢跳俥等連鎖效應。益證本事件操 作人員於控制閥LV-1005發生異常時,未能依其正常 處置作業開啟旁路閥,雖以人力不足、處理警報事 項等為由辯解,但於事故發生歷程可發現當異常訊 號出現後,操作人員未積極採取前端解決反而以末 端解決為主,在在顯示作業人員未依正常處置作為 開啟適當控制閥以排除故障,導致後續因連鎖效應 而陷於警報大作,致生難以處置之困境。 (六)另查中油公司於事件後將本次事故破裂管段送交給 第三專業公正單位(即財團法人工業技術研究院, 下稱工研院)檢驗委託,據工研院107年6月22日「第 二柴油工場管線破損肇因分析」報告摘要略以: 1、F-101加熱爐出口管線之主要破損機制之為短時 間過溫應力破裂,由F-101加熱爐出口管線至 R-101反應器入口端溫度記錄顯示,在短時間內 溫度持續上升,造成肘管下游管線區域發生腫脹 塑性變形,因此管線在約8點鐘方向破裂後洩漏 出高溫高壓柴油,巨大噴射力量使得管線翻轉和 扭曲變形,同時造成肘管及其周遭區域瞬間產生 脆性破壞,形成魚口狀破裂。分析亦確認F-101 加熱爐出口管線肘管及週遭管線之材質,肘管下 游一段30公分長管線材質由P55鉻鉬鋼誤用成P11 鉻鉬鋼,主要的破裂點即在該P116管段位置。 2、在取樣管段內均可發現高溫硫化腐蝕之劣化機 制和證據,但由壁厚量測和腐蝕速率計算結果顯 示,高溫硫化腐蝕問題非破損主因。P5管線在正 5 ASME SA335 Gr P5(簡稱P5)材質。 6 ASME SA335 Gr P11(簡稱P11)材質。
6 常運轉之操作溫度和柴油硫含量條件下,高溫硫 化腐蝕較輕微,而P11管線之高溫硫化腐蝕程度 較高,但尚未減薄至超過腐蝕裕度7;但材質誤用 成P11的管段在溫度失控情況下,發生過溫導致 管線腫脹,造成爆裂和洩漏,所以材料誤用為本 事件之導火線之一。 (七)關於管線材料誤用部分,中油公司及桃園煉油廠於 本院詢問時答復:「經過這次之後我們才知道,當 時(82年建廠時)為何誤用還需要再瞭解,目前透 過管線材質性質確認,將管線已全數更換。補充說 明材質誤用並不是事故發生主因,即便沒有誤用, 在本案這種極端情形下所有材質也無法承受。但針 對案發的管線,現在重新建置時也已經改用更好的 材質」、「就爆管段的材質分析,在正常使用下雖然 是誤用但未曾造成很嚴重的結果,就材料選用上, 建廠當時並沒有適當的儀器可以,後來新建的廠就 有較新的鑑定技術可以完全做到。建廠後的檢測沒 有針對材質誤用部分檢查。」是以,各項材質都有 其操作極限值,若超越材質極限終將導致爆炸發生 應屬正常理論,於是日操作不慎之情形下,終將導 致管線破裂,並無疑義。惟材質誤用影響管線使用 之安全風險,勞動部查復表示「肘管區材質疑似誤 用,為全段管線材質較弱點,並建議中油公司應針 對桃園煉油廠全廠類似單元進行自我查核及改 善,所屬煉製事業部林園廠及大林廠亦應同步展 開」,國營會於詢問時業已承諾會要求中油公司通 7 腐蝕裕度係指考量容器內介質對材料的腐蝕而附加的壁厚裕量。參照壓力容器安全檢查構 造標準第13條、第14條規定:「胴體或其他承受壓力部分所使用之板之腐蝕裕度,應在一 毫米以上。但碳鋼鋼料及低合金鋼鋼料以外之材料,依經驗實績認無腐蝕或磨耗之虞者, 不在此限。」、「內面承受壓力之圓筒胴體或球形胴體之板,其最小厚度應取於承受最高使 用壓力時,發生於該板之應力與該板之容許抗拉應力相等時之板厚加腐蝕裕度之厚度。」
7 盤、專案性的檢測是否有管線材質誤用的情事,將 風險降到最低。 (八)本事件發生後啟動緊急應變程序,未造成人員傷 亡,且控制災害範圍未擴大至廠內其他區域或廠 外,然引起外部周遭居民及用路人之恐慌,並肇生 桃園煉油廠工業安全疑慮,對內因本事件損失高達 新臺幣(下同)6億元以上8。而查中油公司「2017 永續報告書」指出,工安為該公司永續經營的核心 價值之一,除在秉持遵守法令外,持續推動本質安 全理念以確保設備可靠及操作穩定,並致力安衛理 念與文化建構,期達到落實工安查核、謹守SOP、 貫徹安全領導、營造全員工安及健全職場保護等目 標,並透過PDCA,持續改善人員、設備及環境之風 險。再者,經濟部設國營會以監督管理所屬事業單 位,依國營會網站9載明:「組織職掌第三組:有關 中油、台糖及台水等事業經營環境預測分析、 長、中程及年度事業計畫、重大資本支出計畫可 行性研究及年度資本支出計畫之研審;經營績效 評鑑與改進建議、年度工作考成及生產銷售、購 料運輸、重大工程及工安、環保、睦鄰等事項之 協調、督導與改善…… 」、「服務成果:督導事業 工安衛生環保及災害防救-強化工業安全管 理…… 」,是國營會負有督導中油公司落實工業安 全管理之責。據該部國營會所提出「0129中油桃廠 事故行政調查專案報告」載明:「未依指導書相關 8 經濟部查復事故後迄今尚未復工的損失概估如下:未復建期營運,每月南運費用損失估算 2,834萬4,720元(以2月份粗柴油實際南運量10萬公秉計算)。若採計復建期10個月估計,約2 億8,344萬7,200元營運損失。災損及資材損失約7,141萬6,278元(一次性損失)。復建工程初 估金額約2億6千萬元(新購觸媒含裝卸1億1千萬、設備檢查+復建1億5千萬)。 9 國營會網站組織職掌https://www.moea.gov.tw/Mns/cnc/content/Content.aspx?menu_id=1023 1,服務成果https://www.moea.gov.tw/Mns/cnc/content/Content.aspx?menu_id=10292。
8 規範精神停止送料、關斷燃料」、「液位控制閥 LV1005於開爐試俥前經大修檢修及測試仍未能穩 定有效發揮功效」、「危險性設備未經檢查合格即進 行開爐作業潛存風險」、「依中油公司煉製事業部桃 園煉油廠煉製一組作業指導書……所列事項似未 完全落實執行」等內容,是經濟部查復稱「經檢討 本案歲修前後、安全檢查及啟爐作業,與標準作業 程序相同」等云云,顯不足採。 (九)值事件發生後,中油公司、國營會及職安署等均就 本事件之直接原因、間接原因及基本原因等提出檢 討及建議,中油公司提出後續相關制度面、管理面 及設備面之改善作為。基此,中油公司應以此為鑑 具體落實製程安全管理,並平行展開至所屬各事業 部,國營會應確實督導辦理,莫使工安淪為口號, 併此敘明。 (十)綜上,中油公司桃園煉油廠於第二柴油加氫脫硫工 場歲修開爐作業操作不當,肇生107年1月29日之氣 爆及火警事件,損失金額高達6億元以上,更引發 周遭居民恐慌,確有怠失,尤有甚者,本次事件發 現該工場管線有材質誤用情事,突顯桃園煉油廠之 工業及公共安全疑慮亟待改進;經濟部督導不周, 亦有未當。 二、中油公司桃園煉油廠第二柴油加氫脫硫工場內F101 加熱爐,未經檢查合格開爐啟用,本事件後清查發現 該工場共有75座危險性設備,事件當日竟有高達54座 尚未經檢查合格即使用,顯然該公司長期以來未依法 辦理,核有違失。 (一)依職業安全衛生法(下稱職安法)第16條規定:「雇 主對於經中央主管機關指定具有危險性之機械或
9 設備10,非經勞動檢查機構或中央主管機關指定之 代行檢查機構檢查合格,不得使用;其使用超過規 定期間者,非經再檢查合格,不得繼續使用。」 (二)經濟部及中油公司表示,第二柴油加氫脫硫工場加 熱爐辦理內外部定期檢查,共分兩階段實施,第一 階段於設備內實施目視檢查、測厚等檢查項目,第 二階段代檢員來廠確認由該廠提出之爐管壽命評 估、非破壞性檢測及設備對應使用安全閥測試等報 告,符合後進行合格證簽署,需提供之相關報告已 完備,然本案於完成第一階段檢查後,第二階段檢 查程序及合格證簽署正進行中,未及時完成。 (三)惟據勞動部查復,危險性機械及設備代行檢查業務 係由勞動部委託中華鍋爐協會辦理,該協會依「危 險性機械及設備安全檢查規則」及「火焰加熱爐定 期檢查作業標準」實施檢查,其檢查項目及重點分 別壽命評估11及內外部檢查12。代行檢查機構(下稱 代檢機構)對加熱爐之檢查範圍,為加熱爐本體至 加熱爐管嘴出口第一個法蘭面13,管線尚不屬於加 熱爐檢查範圍。是本案加熱爐(含管線)中油公司 應依高壓氣體勞工安全規則第240條規定,對該加 熱爐(含管線)實施定期安全維護、保養及檢點, 並對有發生腐蝕、劣化、缺損、破裂等有礙安全部 10 依危險性機械及設備安全檢查規則第3條及第4條規定,危險性機械包括固定式起重機、移 動式起重機、人字臂起重桿、營建用升降機、營建用提升機、吊籠;危險性設備包括鍋爐、 壓力容器、高壓氣體特定設備、高壓氣體容器,並分別規範其容量。 11 壽命評估:如加熱爐之使用年限超過設計時數,或操作異常達潛變溫度以上者,除由具有 美國石油協會(American Petroleum Institute, 簡稱API)或美國機械工程師協會(American Society of Mechanical Engineers, 簡稱 ASME )ASME 標準之授權檢查員(Authorized Inspector),或機械技師等相關資格之第三者,實施壽命評估並簽署其使用年限外,應維修 及汰換爐管並實施內外部檢查。 12 內外部檢查:目視檢查、測厚、耐壓試驗、非破壞性檢測、安全閥、壓力表、溫度計等。 13 法蘭:譯自Flange,或稱法蘭盤,指連接管道、容器或固定軸類機械部件所用的對稱盤狀 結構,通常有螺栓、螺紋結構以資固定。法蘭連接是由一對法蘭、密封墊片和螺栓、螺母、 墊圈等零件組成的一種可拆零件。
10 分,採取必要補修、汰換或其他改善措施,以確保 高壓氣體設施之安全運作。 (四)本案加熱爐於82年製造,103年1月申請既有檢查合 格,嗣依「危險性機械及設備安全檢查規則」規定, 實施2次外部及2次內外部共4次定期檢查,最近1次 (107年1月16日)係辦理內外部定期檢查,實施目 視檢查、測厚等檢查項目,惟因中油公司未提出壽 命評估、非破壞性檢測、安全閥等報告,故當日未 完成檢查程序,尚未判定合格。勞動部於本事件當 日即對中油公司2座高壓氣體特定設備未再經檢查 合格即予使用,處罰鍰30萬元整14。是以中油公司 桃園煉油廠違反職安法第16條第1項之規定,至為 明確,中油公司所述「合格證簽署正進行中,未及 時完成」等云云,洵不足採。 (五)另以,職安署於本院詢問前後查復及相關卷證,於 本事件後檢視同一時間同一作業場所(指第二柴油 加氫脫硫工場)共有75座危險性設備,於開爐當日 未經代檢機構檢查合格及使用中高達54座,該署及 北區中心於本院詢問時表示:「以中油過去曾有未 經簽署即使用的情形,未來會持續要求代檢機構要 提醒事業單位一定要等兩階段完備才能啟用。」中 油公司及桃油煉油廠對此表示:「過去現場同仁會 認為第一階段既然檢查合格了,簽署期程還要再依 代檢機構排程而不願意等候即使用,以前就常發生 這樣的情形,未來我們一定是簽署完畢才會使用。」 可證中油公司長久以來對於危險性設備之檢查,均 14 違法事實及處分理由為:中油公司桃園煉油廠第二柴油加氫脫硫工場加熱爐(F101、R101) 2座屬高壓氣體特定設備,其既有高壓氣體特定設備檢查合格證所示有效期限自106年1月 22日至107年1月21日及自106年1月20日至107年1月19日,已逾其有效期限,並於檢查當日 仍發現持續使用,違反職安法第16條第1項之規定。
11 未待取得合格文件即率爾使用,無視法令規範,核 有違失。 (六)綜上,中油公司桃園煉油廠第二柴油加氫脫硫工場 內F101加熱爐,未經檢查合格開爐啟用,本事件後 清查發現該工場共有75座危險性設備,事件當日竟 有高達54座尚未經檢查合格即使用,顯然該公司長 期以來未依法辦理,核有違失。 綜上所述,台灣中油股份有限公司桃園煉油廠於第 二柴油加氫脫硫工場歲修開爐作業操作不當,引發氣爆 及火警事件,且該工場管線有材質誤用情事,確有怠失; 經濟部督導不周,亦有未當。復該工場加熱爐未經檢查 合格開爐啟用,該公司長期以來未依法辦理,核有違失, 爰依憲法第97條第1項及監察法第24條之規定提案糾 正,移送經濟部督同所屬確實檢討改善見復。 提案委員:仉桂美 中 華 民 國 1 0 7 年 8 月 8 日
FD06174 | 2018_台湾_台北醫院護理之家大火_監察院糾正案文.pdf
分类:06_境外及港澳台调查报告 | 年份:2018 | 地域:台湾 | 严重程度: | 场所: | 起火原因:电气 | 来源格式:pdf
1
糾 正 案 文
壹、被糾正機關:衛生福利部臺北醫院。 貳、案 由:衛生福利部臺北醫院護理之家怠未依規定 對住民自備之電磁波床墊等用電物品善 盡安全管制之責,僅依住民家屬之要求, 未經專業評估及檢查,亦未取得防火管理 人許可,即任由該住民擅自使用,復於該 床墊長達近1年之使用期間,更未再確認 其安全性,終因該床墊電氣因素釀成107 年8月13日大火災害;該機構復未即時通 報消防機關,致該院火警受信總機作動響 起警報逾7分鐘後,消防機關始獲該院報 案,該院災害緊急應變及通報演練作業亦 有欠確實與熟練,相關防災設備啟閉時程 更難謂迅速即時,經核確有違失,該院洵 難辭監督管理不力之咎,爰依法提案糾正。 參、事實與理由: 自民國(下同)92年3月間設立,坐落於新北市新莊區 思源路127號之衛生福利部(下稱衛福部)臺北醫院(下稱 臺北醫院),於107年8月13日清晨4時29分許,位於該院A 棟之該院附設護理之家(下稱臺北醫院護理之家)7A23室 5號床床墊突然起火燃燒致生濃煙竄流彌漫,釀成15人死 亡 1之重大意外(下稱本案大火災害)。茲因人命關天,至 為重大,究竟該院平時有無健全災害預防及防火管理等 時有無健全災害預防及防火管理等 安全措施,相關緊急通報及應變演練是否確實,認有深 入究明之必要,爰立案調查。 本案經前往衛福部臺北醫院護理之家,除聽取衛福
1 據衛福部截至101 年11 月15 日之統計更新資料。
2
部附屬醫療及社會福利機構管理會(下稱醫福會)、護理 及健康照護司(下稱照護司)、臺北醫院、內政部營建署 (下稱營建署)建築管理組、內政部消防署(下稱消防署) 火災調查組、火災預防組、新北市政府衛生局、消防局(下 稱新北市消防局)、工務局、社會局、經濟發展局、警察 局新莊分局等相關機關主管人員簡報及說明之外,並實 地履勘起火處、逃生動線及受災設施。嗣詢問衛福部醫 福會、臺北醫院、照護司及新北市消防局、衛生局等相 關業務主管人員及系爭火災當夜相關值勤人員。復針對 前揭調查發現疑點函詢内政部(營建署、消防署),再就 相關待釐清事項詢問臺北醫院院長,繼而持續蒐研相關 卷證及參考文獻之調查發現,系爭護理之家疏未對住民 用電物品善盡安全管制之責,相關緊急通報及應變作業 亦有疏漏與延誤,經核確有違失,臺北醫院顯難辭監督 管理不力之責,應予糾正。茲臚列事實與理由如下: 一、臺北醫院護理之家依該機構消防防護計畫、防災應變 計畫及住民公約,應對住民自備之電磁波床墊等用電 物品善盡安全管制之責,詎該護理之家僅依住民家屬 之要求,未經專業評估及檢查,亦未取得防火管理人 許可,即任由該住民擅自使用,復於該床墊長達近1 年之使用期間,更未再確認其安全性,凸顯該機構防 災警覺性不足,安全管理作為不無消極因循,臺北醫 院洵難辭監督管理不力之咎,核有違失: (一)按臺北醫院及其附設護理之家依醫療法第25條第1 項及消防法第13條第1項等規定,分別訂定之「緊 急災害應變計畫」暨「防災暨應變計畫」、「火災緊 急應變計畫」及「消防防護計畫書」載明略以:「 5.2.6 預防災害注意事項及措施:(1)火災預防措 施:……(b)用火、用電之監督管理:……(iii)… …另不得攜帶私人電器。(iv)不得攜帶私人延長線
3
……」、「附件6.1、火災危險因子表之『延長線及 電器管理』嚴重度防範對策:……3、禁止民眾攜 帶電器入院使用」、「壹、總則之一、目的與適用範 圍:(一)目的:本計畫規定本場所防火管理必要事 項,以落實預防火災……之目的,並達到保障人命 安全、減輕災害之目標。(二)適用範圍:在臺北醫 院護理之家服務、出入之一切人員都必須遵守 遵守。… …。貳、預防管理對策:……二、火災預防措施: ……(二)從事下列行為應事先向防火管理人聯絡 取得許可後,始得進行:……2、各種用火用電設 備、器具之設置或變更時。……」臺北醫院網站公 布之「民眾就醫權利與倫理原則」亦明載:「病人 義務:……五、病人禁止攜帶危險物品及法定違禁 品到醫院,違者自動出院或強制報警」。是臺北醫 院自應督同系爭護理之家 2落實上開各災害預防及 防火管理相關規定,以確保住民及公共安全。 (二)據消防署、新北市消防局、衛福部等查復資料及該 局H18H13E1火災原因調查鑑定書分別載明略以:「 本案起火病房7A23房235床電動床上未使用醫院規 範之床墊,放置住民自購之電磁波床墊,該電磁波 床墊係由3塊床墊串聯而成,其起火原因係因使用 過程中串聯床墊之電源線,遭擠壓彎折致生短路而 引燃周邊可燃物」、「起火點為7樓護理之家7A23室5 號床」、「起火原因為:『電氣因素』」,顯見臺北醫 院護理之家於107年8月13日清晨發生之大火災害 ,據消防機關依火場相關跡證鑑定結果,乃肇因於 住民自購之電磁波床墊電源線電氣因素,從而系爭 護理之家於本案大火之前,有無對該電磁波床墊善
2 據衛福部查復,臺北醫院附設護理之家之財產、營運績效、指揮管理、人員指派、輪值、 調度受臺北醫院管理。
4
盡安全管制之責,自屬本案究明之重點。 (三)針對上情,詢據衛福部、臺北醫院於本院履勘前、 履勘時、詢問前及詢問時分別表示略以:「入住時 有告知家屬住民生活公約以及電器使用規範,但入 住後家屬堅持要使用自己帶來的床墊,聲稱此床墊 是可以促進循環,可以讓住民恢復的健康床墊,故 家屬自行更換自己帶來的床墊……」、「每日執行『 日常火源自行檢查表』,查核皆無異常現象」、「該 住民於106年9月15日入住時,本院護理師有告知家 屬醫院有自設床墊不需自行帶入,因該物品並非屬 目的事業主管機關所規範管制項目,若起火原因為 當事人不當操作所造成,本院實已善盡管理人義務 之責……」、「護理之家工作人員知道家屬私自攜帶 床墊,因為床墊不屬於危險物品,亦非法令規範屬 責任或義務管制項目……」、「有關住民生活公約等 注意事項,張貼於布告欄,入住時跟家屬說明,雖 未請病人或其家屬簽名,但有盡到明確告知義務, 每間病室也有張貼禁止使用電器的公告……」、「本 案813大火前,國內相關法令未有相關明文規範禁 止病人私自攜帶插電物品或電器,但本院已有告知 ,並有張貼禁止使用電器之公告……」、「……因該 床墊並非檢查項目內,機電人員未檢查評估該床墊 ,且無法知悉此床墊存在」等語,足證臺北醫院護 理之家於本案大火之前,系爭電磁波床墊未經該院 工務單位專業之評估及安檢小組之檢查,亦未聯絡 取得該院防火管理人員許可,即任由該住民擅自使 用,嗣於該床墊自該住民於106年9月15日入住迄本 案大火發生前之長達近1年使用期間,未再確認其 安全性。 (四)雖據衛福部及臺北醫院表示:「該電磁波床墊不屬於
5
危險物品及法令規範管制項目」、「該電磁波床墊非 屬高功率、高耗電用品」云云,惟查,臺北醫院護 理之家舉凡一般低功率、低耗能之小電扇至高功率 、高耗能之電暖器、電湯匙等各種用電設備、物品 、器具之設置,自應事先向該院防火管理人聯絡取 得許可後,始得為之,一般民眾攜入之用電設備, 無論屬高功率或低功率產品,悉屬禁止之列,允無 例外可循,上開規定既至為明確,臺北醫院及其附 設護理之家服務及出入之所有人員均應切實遵守 ,落實執行。 (五)尤以系爭護理之家住民絕大多數為行動不便者,防 災、防火管理強度本應更勝一般公共場所,縱使工 作人員囿於入住民眾家屬強烈堅持,允讓其使用, 固情可憫,然基於公共利益大於私益原則,自不容 任何私益凌駕於公共安全之上,該院允應經專業評 估以確認病人有其使用需求之後,再聯絡用電專業 技術人員詳實評估該插電物品之安全性無虞,始准 其繼續使用,此舉除可避免相關責任均諉由基層工 作人員獨攬之外,更可落實專業分工原則。以上復 觀長期在美國醫療機構服務之專業醫事人員表示 :「當醫療機構發現病人私自攜帶插電物品或電器 時,理應禁止;倘無法禁止,經評估後確認病人有 其需求,必須聯絡醫療機構總務單位專業技術人員 聯絡醫療機構總務單位專業技術人員 詳實評估該電器之安全性無虞後,始准病人繼續使 用」等語 3益明。又,倘衛福部、臺北醫院認該電磁 波床墊非屬高功率、高耗電用品,無需管制,何須 自本案大火後調整該院相關評鑑標準及管制作業 流程,此有衛福部、臺北醫院分别於本院第1次、
3 專家學者於本院107 年11 月間另案召開之諮詢會議所表示意見。
6
第2次詢問前表示:「目前正進行醫院評鑑基準研修 ,擬納入下列事項:……(2)對於病人或家屬自帶 電器或危害物品之管理與防災措施」、「本案大火後 ,如病人私自攜帶插電物品或電器時,必須聯絡醫 聯絡醫 療機構總務單位專業技術人員詳實評估,本院已經 制定相關流程及通報」等語足憑,凡此益證臺北醫 院前揭陳詞悉屬飾卸之詞,矛盾難採,在在凸顯該 院防災警覺性不足,相關防災計畫、規定淪於紙上 談兵而未落實執行,安全管理作為不無因循怠慢, 衛福部自難辭監督不周之責。 (六)綜上,臺北醫院護理之家依該機構消防防護計畫、 防災應變計畫及住民公約,應對住民自備之電磁波 床墊等用電物品善盡安全管制之責,詎該護理之家 僅依住民家屬之要求,未經專業評估及檢查,亦未 取得防火管理人許可,即任由該住民擅自使用,復 於該床墊長達近1年之使用期間,更未再確認其安 全性,凸顯該機構防災警覺性不足,安全管理作為 不無因循怠慢,臺北醫院洵難辭監督管理不力之咎 ,核有違失。 二、臺北醫院護理之家未依規定於察覺失火後第一時間 通報消防機關,致該院火警受信總機作動響起警報逾 7分鐘後,消防機關始獲該院報案,該院災害緊急應 變及通報演練作業亦有欠確實與熟練,肇使值勤人員 遇災慌亂失措而誤撥緊急通報專線號碼,相關防災設 備啟閉時程復難謂迅速即時,殊有欠當,臺北醫院監 督不周,顯有違失: (一)按臺北醫院及其附設護理之家訂定之「防災暨應變 計畫」、「火災緊急應變計畫」及「消防防護計畫書 」分別載明略以:「5.2.4應變:發現火災第一人立 即按消防警鈴,通報總機(緊急通報分機5999)、消
7
防指揮中心119,疏散現場病人,對火源進行滅火 。……」、「5.3火災緊急應變RACE:以「RACE」作 為火災緊急應變應完成事項,方便員工記憶。發現 火災後:(a)R(Remove、Rescue):立即將病人移出 著火的區域或房間。(b)A(Alarm):按消防警鈴, 通報總機(分機9)及消防指揮中心119,請總機廣播 或是通知其他周邊的人員。(c)C(Contain):人員 撤離著火的病房立即關上房門,把火及煙侷限在某 一區域,以利人員疏散。(e)E(Extinguish):對火 源進行滅火。……」、「肆、假日暨夜間之防火管理 體制:……二、……當夜間及假日發生火災時,應 採取下列應變作為:……(一)立即通知消防機關 (119)」是臺北醫院護理之家值勤人員遇火災發生 時,任何人員發現火災第一時間應立即撥打119通 報消防指揮中心,前開計畫規定至為清楚。 (二)據衛福部及新北市政府查復 4,107年8月13日清晨4 時29分27秒 5,系爭護理之家值班謝姓護理師(下稱 謝護理師)聽聞火警警報聲響後起身前往(東側) 7A23房查看;4時29分32秒,照服員自配膳室探頭 查看;4時29分42秒,謝護理師已見7A23房5號床之 床簾起火燃燒,遂大聲喊叫並衝往護理站方向;4 時29分43秒,2位照服員衝往失火處;4時29分49秒 ,謝護理師按壓護理站北側牆面之火警手動警報設 備後,衝返失火處;4時30分8秒、15秒,謝護理師 返抵護理站2度撥打有線電話5999緊急通報專線通
4 資料來源:衛福部於本院詢問前提供之書面說明資料第14 至15 頁、新北市消防局H18H13E1 火災原因調查鑑定書、第二救災救護大隊火災搶救報告書。 5 系爭護理之家監視器時間為4 時27 分12 秒(較校正後之標準時間4 時29 分27 秒約慢2 分 15 秒),火警自動警報設備R 型受信總機【下稱受信總機,位於急診大樓2 樓總機室】作動 紀錄為4 時26 分44 秒(經校正後之正確時間約為4 時28 分59 秒)偵測7A23 房定址偵煙, 以下皆為修正後之時間。
8
報總機,無通話反應;4時30分10至32秒,照服員 及外籍看護陸續拿滅火器協助滅火;4時30分21秒 、27秒、32秒,謝護理師改用其他有線電話3度撥 打9通知總機,無人接聽;4時30分45秒,謝護理師 改用無線電話撥打9,無人接聽;4時30分39秒,謝 護理師關閉空調;4時30分58秒,謝護理師與總機 郭姓值班人員通上電話,總機隨即通知技工、保全 查看確認並通報值班護理長(3302);4時31分5秒, 謝護理師按壓排煙裝置;4時31分27秒,第1位住民 (即自備電磁波床墊之潘姓住民)由2位照服員及外 籍看護協力徒手摸黑 6自失火之7A23房搬移出;4時 33分許,其他樓層照服員及臺北醫院醫護人員陸續 趕抵系爭護理之家協助搶救其他住民並持續滅火 ;4時36分3秒,新北市消防局消防救災指揮中心119 專線接獲臺北醫院總機值班人員報案,隨後該局 119專線分別於4時38分、39分及45分陸續接獲臺北 醫院總機值班人員、新北市110專線及臺北醫院護 理之家7樓住民報案;4時41分,新北市消防局第1 批救災搶救人員及車輛抵達失火現場;5時15分控 制火勢,並於5時27分撲滅火勢,殘火至7時25分處 理完畢 7。 (三)據上顯見,系爭護理之家當夜值勤人員及臺北醫院 總機值班人員獲悉失火後,竟未依上開規定於第一 時間立即通報消防機關,致該院火警自動警報設備 受信總機於本案大火當日清晨4時28分59秒作動響
6 據衛福部分别查復略以:「失火病室煙霧瀰漫距離發現火源時間僅2 分59 秒」、「當日立即疏散失火 居室的住民,疏散完第1 名住民後病室即濃煙密布,視線不佳,照服員依舊進入失火病室疏散第2 名、第3 民住民,至疏散第四名住民時已經伸手不見5 指,僅能尋聲救人,已無法看見房門。」「當 日將迅速將非起火居室住民疏散至相對安全區,疏散14 名住民後。因火勢及濃煙蔓延迅速,煙層已 下降至整個病室且無法看見,在疏散14 名住民撤離火場」。 7 以上新北市消防局受理報案等相關時間皆引自該局於本院履勘前及詢問前提供之資料。
9
起警報約逾7分鐘後,遲至4時36分3秒,新北市消 防局始獲該院報案,證諸新北市消防局查復:「依 一般類型建築物(如住宅、辦公室等)火災時序(初 期、成長期、最盛期及衰退期)之各時期熱釋放率 探討火災發展狀態,約莫75秒即可達1,300KW之最 大熱釋放率」、「一般而言,防火構造建築物發生火 災後由起火至最盛期之時間約6至27分鐘,如就其 內部裝潢材料溫度上升之時序探討,約莫6分鐘即 可達近千度之最大燃燒溫度」等語,就系爭護理之 家前述「長達7分鐘餘之延遲報案時間」及「察覺 失火生煙後,分別約1分半及2分鐘始關閉空調、開 啟排煙裝置」等遲滯情形以觀,恐難排除對於火勢 之擴散及濃煙四處流竄等負面加劇之影響。 (四)復據衛福部及臺北醫院於案發後查證結果,本案大 火當日該院總機「5999」緊急通報專線電話並未響 起,該專線電話螢幕顯示亦無撥入紀錄,經查閱系 爭護理之家斯時通聯紀錄發現,謝護理師實際撥打 號碼為「8999」,以一般話機按鍵「8」緊鄰按鍵「 5」下方觀之,不排除係因臨危慌亂而誤觸,固屬 人之常情,一般人未達熟練境界,值驚慌之際,恐 皆有誤觸之可能,在所難免,且斯時現場值勤人員 冒著高熱煙流灼傷、嗆傷及一氧化碳已達致死濃度 等高度危險,仍奮不顧身,反覆進出火場搶救,容 難嚴予苛責。然審諸該誤撥行為併同上述延遲通報 消防機關及啟閉相關設備等遲滯舉措,不無凸顯臺 北醫院及系爭護理之家平時演練作業之頻率及內 時演練作業之頻率及內 容未臻充分與確實,4碼通報專線號碼亦顯難記, 致相關應變及通報作業未達熟練之境而無以遇災 時形成反射動作,此復觀臺北醫院於本院2度詢問 前分別所提相關改善措施載明略以:「透過演練強
10
化風險教育」、「經本案大火事件後,已將『緊急事 件通報專線5999』簡化為『59』」2碼」等語益明。 (五)雖據臺北醫院分別表示:「依本院災害緊急應變流程 係先通報總機,再由總機通報119」、「依據消防署 自衛消防編組通報班規定,確認起火後才能通報」 云云,惟查,臺北醫院及其附設護理之家上開所訂 「防災暨應變計畫」、「火災緊急應變計畫」及「消 防防護計畫書」既已明定:「發現火災第一人立即 通報總機、消防指揮中心119」,並無先通報總機, 再由總機撥打119之先後順序,況且,本案大火當 日值班護理人員既已親眼發現火源,總機值勤位置 亦可清楚察覺受信總機火警通報警示,並經值班護 理人員通報失火訊息,以上兩名值勤人員當下本皆 可立即通報119,卻皆未立即為之,在在顯示臺北 醫院前揭陳詞,難資為該院有利之認定,尚難採信 ,益證該院災害緊急應變及通報演練作業未臻熟練 確實,亟應積極檢討改善。 (六)綜上,臺北醫院護理之家未依規定於察覺失火後第 一時間通報消防機關,致該院火警受信總機作動響 起警報約逾7分鐘後,消防機關始獲該院報案,該 院災害緊急應變及通報演練作業亦有欠確實與熟 練,肇使值勤人員遇災慌亂失措而誤撥緊急通報專 線號碼,相關防災設備啟閉時程復難謂迅速即時, 殊有欠當,臺北醫院監督不周,顯有違失。
11
綜上所述,衛生福利部臺北醫院確有違失,爰依憲 法第97條第1項及監察法第24條之規定提案糾正,移送衛 生福利部轉飭所屬確實檢討改善見復。
提案委員:王帅玲、張武修、尹祚芊
FD06175 | 2018_台湾_桃园敬鹏工厂火灾_监察院纠正案文.pdf
分类:06_境外及港澳台调查报告 | 年份:2018 | 地域:台湾 | 严重程度: | 场所:厂房/车间 | 起火原因: | 来源格式:pdf
1
糾 正 案 文
壹、被糾正機關:桃園市政府。 貳、案 由:民國107年4月28日21時許,桃園市平鎮工 鎮工 業區敬鵬工業股份有限公司平鎮三廠火 鎮三廠火 警造成消防人員6人及敬鵬公司外籍勞工 2人死亡,經核桃園市政府消防局救火指 揮官均未詳閱消防安全設備平面圖,亦未 面圖,亦未 仔細詢問該公司人員,故不知火場建築有 二廠、三廠之分,亦不知三廠東北、東南、 西北面共有三個出入口,致嗣後7名消防 員受困於東南角貨梯附近時,仍由東北角 出入口進入沿水線繞ㄇ字形長路救援;另 雖派員進入三廠救災,卻未曾派員前往二 廠4樓宿舍區搜索,期間相關人員雖曾2度 前往查看,但均未能確認有無人員受困在 內,終至火勢迅速蔓延擴大後而難以救 援;又救火指揮官於是日21時42分已知全 面燃燒,卻遲至21時57分始通知入室人員 撤出,肇致入室人員持續深入火場,陷於 險 境卻渾然未覺 境卻渾然未覺,確有怠失,爰依法提案 糾正。 參、事實與理由: 民國(下同)107年4月28日21時許,桃園市平鎮工 鎮工 業區敬鵬工業股份有限公司(下稱敬鵬公司)平鎮三廠 鎮三廠 (桃園市平鎮區工業二路 鎮區工業二路17號)火警,火勢沿該公司平 鎮三廠東側外牆排風管往上延燒至頂樓廢氣處理設 備,再沿排風管及酸排風管迅速向下延燒至其他樓層, 至各樓層均陷於火海中,桃園市政府消防局共計出動各 式消防及救護車輛212車次,消防及義消人員801人次,
2
然仍造成消防人員6人及敬鵬公司外籍勞工2人死亡。 案經本院迭次迭次調卷、函詢、履勘、訪查、受理 陳情、詢問相關主管機關人員之調查發現,桃園市政府 消防局救火指揮官均未詳閱消防安全設備平面圖,亦未 面圖,亦未 仔細詢問敬鵬公司人員,故不知火場建築有二廠、三廠 之分,亦不知三廠東北、東南、西北面共有三個出入口, 致嗣後7名消防員受困於東南角貨梯附近時,仍由東北 角出入口進入沿水線繞ㄇ字形長路救援;另雖派員進入 三廠救災,卻未曾派員前往二廠4樓宿舍區搜索,期間 相關人員雖曾2度前往查看,但均未能確認有無人員受 困在內,終至火勢迅速蔓延擴大後而難以救援;又救火 指揮官於是日21時42分已知全面燃燒,卻遲至21時57分 始通知入室人員撤出,肇致入室人員持續深入火場,陷 於險境卻渾然未覺,以上確有怠失 境卻渾然未覺,以上確有怠失,應予糾正。茲臚列 事實及理由如下: 一、救火指揮官依法負責指揮人命救助及火災搶救部署 任務。107年4月28日21時許桃園市敬鵬公司平鎮三廠 鎮三廠 發生火警,起火點位於平鎮三廠 鎮三廠5樓。火場指揮官蘇 文遠、陳宏銓、黃世忠陸續抵達現場後,均未詳閱敬 鵬公司之消防安全設備平面圖,亦未仔細詢問敬鵬公 面圖,亦未仔細詢問敬鵬公 司人員,故不知火場建築有二廠、三廠之分,亦不知 三廠東北、東南、西北面共有三個出入口,以為只有 一個出入口位於東北面,所以未能指揮消防員水線部 署,採取由東南角出入口進入直通東南角樓梯上樓之 捷徑,而是採取由東北角出入口進入繞行西面再至東 南角樓梯上樓之ㄇ字形之最長路徑,且導致嗣後7名 消防員受困於東南角A貨梯附近時,未能利用近在咫 尺之東南角出入口進行通訊聯絡及快速進入救援,而 是由東北角出入口進入沿水線繞ㄇ字形長路救援,造 成因救援路程太遠及機具阻隔而難以搶救,6名隊員
3
不幸喪生,核有明確違失。 (一)依106年8月23日修正之消防機關火場指揮及搶救作 業要點(下稱作業要點)規定,救火指揮官由轄區 消防大(中)隊長、消防分隊長或救災救護指揮中 心指定人員擔任。同作業要點第3點火場指揮官任 務規定:「……(二)救火指揮官:1.負責指揮人 命救助及火災搶救部署任務。2.劃定火場警戒區。 3.建立人員裝備管制站。4.指揮電力、自來水、瓦 斯等相關事業單位,配合執行救災。5.指揮救護人 員執行緊急救護。6.災情回報及請求支援等事宜。」 第7點火災搶救作業要領規定:「(一)整備各式搶 救資料:1.當日人員、車輛救災任務派遣編組表。 2.甲、乙種搶救圖(甲種搶救圖:就地圖內相關街 道、建築物位置、樓層高度、水源狀況、消防栓管 徑大小、位置及池塘、蓄水池、河川、湖泊、游泳 池位置等可供消防救災車輛出入等相關資料,予以 符號標記標示,提供災害搶救參考;乙種搶救圖: 針對轄內搶救不易場所(供公眾使用建築物為 主),以會審、勘之消防圖說繪製,並註記各對象 物可供救災運用之消防安全設備、位置、數量及供 人命救助、災害搶救參考之內部設施資訊)。…… (三)出動派遣:……3.初期救火指揮官應攜火警 地址登錄資料、甲、乙種搶救圖、搶救部署計畫圖、 及其他相關搶救應變指南等資料出動。(四)出動 途中處置:1.出動途中應隨時與指揮中心保持聯 繫,將所觀察之火、煙狀況,立即回報指揮中心, 並進一步了解指揮中心蒐集之現場情資。2.初期救 火指揮官應就派遣之人車預作搶救部署腹案,並以 無線電或資通訊系統告知所屬及支援人員,以便抵 達火場時能立即展開搶救作業。(五)抵達火場處
4
置:1.災情回報:初期救火指揮官到達火場,立即 瞭解火場現況(建築物樓層、構造、面積、火點位 置、延燒範圍、受困災民、儲放危險物品等) 物品等),並 回報指揮中心。」 (二)查桃園市平鎮工業區敬鵬工業股份有限公司(下稱 鎮工業區敬鵬工業股份有限公司(下稱 敬鵬公司)發生火災之建物,分東西兩側廠房。東 側平鎮二廠位於桃園市平鎮區工業二路 鎮區工業二路15號,於83 年6月10日取得使用執照,為地上4層、地下1層RC 結構(3層鋼筋混凝土建築,為辦公室,4樓鐵皮加 蓋作員工宿舍使用),總樓地板面積7,873平 方公 方公 尺。西側平鎮三廠位於 桃園市平鎮區工業二路 鎮區工業二路17 號,於91年4月取得使用執照,與平鎮二廠係相鄰之 鎮二廠係相鄰之 工廠,地上8層、地下3層RC結構,總樓地板面積 19,361平 方公尺。使用執照 方公尺。使用執照91桃縣工建使字第0458 號。廠區平面圖如圖 面圖如圖1,兩廠中間之3公尺防火間隔, 於91年平鎮三廠建造竣工後之同年 鎮三廠建造竣工後之同年10月21日,由敬 鵬公司與昌勝營造股份有限公司簽署「平鎮二、三 鎮二、三 廠聯接通新建工程」合約書,於平鎮二廠、三廠間 鎮二廠、三廠間 防火間隔增建各樓層間連通走道之違章建築。
5
資料來源:桃園市政府。 圖1 平 鎮二廠、三廠廠區防火間隔 鎮二廠、三廠廠區防火間隔3公尺 (三)依內政部桃園市敬鵬工廠火災全方位檢討策進專案 報告,107年4月28日21時許,平鎮三廠火警,火勢 鎮三廠火警,火勢 沿三廠東側外牆排風管往上延燒至頂樓廢氣處理 設備,再沿排風管及酸排風管迅速向下延燒至其他 樓層,至各樓層均陷於火海中,桃園市政府消防局 共計出動各式消防及救護車輛212車次,消防及義 消人員801人次,然仍造成消防人員6人及敬鵬公司 外籍勞工2人死亡。107年4月28日7位消防員受困平 鎮三廠1樓時間長達3至7小時,死傷位置如圖2,7 人均位於東南角落貨梯A附近。受困期間,火場指 揮官雖派RIT入內搜救,救援動線,呈ㄇ字型,如 圖3。
6
資料來源:桃園市政府消防局火災原因調查鑑定書。 圖2 消防員死傷位置圖(平鎮三廠 鎮三廠1樓)
7
資料來源:桃園市平鎮區工業二路 鎮區工業二路17號1070428敬鵬工業公司火警檢討報告,107年5月,第5頁 圖3 救災及救援動線圖 (四)本件火災現場救災時序及發生原因,依桃園地檢署 起訴書及內政部「1070428桃園市敬鵬工廠火災全 方位檢討策進專案報告」所載,如下所示: 1、敬鵬公司平鎮廠火災現場位置圖,如圖 鎮廠火災現場位置圖,如圖4。災後 正面圖,如圖5。 2、107年4月28日21時15分許,敬鵬公司平鎮三廠 鎮三廠1 樓警衛室之授信總機火災警報警起,顯示區域係 5樓107、108迴路亮燈,廠區警衛陳○○依敬鵬 公司安全衛生管理原則,通報5樓內作業人員及 該公司工務部公用設備課維護工程師張○○處 理此事,張○○即前往5樓廠區查看。21時16分 許,5樓廠區作業人員等人亦發覺防焊區隧道式 烤箱前側有濃煙,於尋找起火點不成,因濃煙逐 漸密布整個廠區,廠區內作業人員即陸續撤出,
8
至北側1樓警衛室前方集結。廠區警衛陳○○並 於同日21時23、24分許通報桃園市政府警察局平 鎮派出所,桃園市政府消防局21時26分受理報 案,立即派遣山峰、平鎮等臨近分隊前往搶救, 鎮等臨近分隊前往搶救, 於21時32分到達現場(如圖6),現場初期指揮官 即山峰分隊代理分隊長蘇文遠率所轄分隊前往 搶救,於21時35分許指揮山峰分隊隊員林伯庭、 游博瑜、余佳昇3人、21時37分許指揮平鎮分隊 鎮分隊 小隊長李翰霖帶領隊員林尉熙、呂宗郁3人進入 平 鎮三廠部署水線及搜尋受困人員,同時間埔心 鎮三廠部署水線及搜尋受困人員,同時間埔心 分隊小隊長游曜陽亦向蘇文遠報到,並受其指揮 入室協助帶班救災。 3、21時45分許,桃園市政府消防局第四大隊組長陳 宏銓到達火災現場後,於21時48分現場指揮權即 移轉與陳宏銓。21時56分組長陳宏銓發現平鎮三 鎮三 廠南側外牆已全面燃燒(第3面頂樓火勢迅速沿 外牆向下延燒),以無線電第七頻道(即指揮頻 道)通知蘇文遠,請其立即以第五頻道(即現場 頻道)下令入室救災之李翰霖等7人先行撤出火 場,22時指示龍潭分隊入室佈署導光索,並確認 入室同仁情況與位置。22時01分組長陳宏銓持續 與入室人員聯繫,推測入室人員可能受困,立即 集結人員至第一面待命支援。22時10分第四大隊 大隊長黃世忠到場,指揮權轉移至黃大隊長。22 時15 分第1 梯次緊急應變救援小組(Rapid Intervention Team,下稱RIT)人員入室救援, 後續RIT人員分梯輪替進入持續救援,於翌日(4 月29日)0時51分第10、11、12梯次RIT人員合力 救出第1名受困消防人員呂宗郁。桃園市政府消 防局不斷派出RIT人員進行救援,總計派出23梯
9
次RIT人員,於4月29日4時53分救出第7名受困消 防人員李翰霖。另於4月29日5時6分及5時53分分 別找到2名罹難之敬鵬公司外籍勞工。概略時序 表,如表1,消防水線佈設救災及救援動線圖, 如圖7及同圖3。
圖4 火災現場位置圖
圖5 勘查現場,發現現場位於平鎮區 鎮區 工業二路17號(敬鵬公司平鎮廠, 鎮廠, 由北向南拍攝)
圖6 搶救火災時,最初發現火勢位於 平 鎮 鎮三廠5樓及5樓東側(外部),未 波及他戶(由北向南拍攝) 資料來源:均摘自桃園市政府消防局火災原因調查鑑定書。
10
表1 救災及救援概略時序表 空白 資料來源:內政部「1070428桃園市敬鵬工廠火災全方位檢討策進專案報告」。
11
資料來源:桃園市政府消防局於本院107年5月7日履勘簡報及本院實地履勘。 圖7 平 鎮三廠 鎮三廠1樓東南側角落(最靠近人員死傷位置之出口)放大圖 (五)依桃園地檢署檢察官起訴書,本案起火原因係因敬 鵬公司平鎮三廠 鎮三廠5樓隧道式烤箱區PCB板上所塗製印 刷油墨經烤箱烘烤加熱後,會產生易燃之揮發性有 機化合物(簡稱VOC)等熱氣體,該VOC一部分會上 升至烤箱上方熱排風管內,並於冷凝後變成液態VOC 滯留於熱排風管內,當此處VOC氣體濃度過高時,若
12
遇火星等火源,即有發生火災之虞。是日於烘烤PCB 板製程中,所產生油墨碎屑或其他毛髮等細微異 物,因烤箱內部循環及壓力差,致該等異物被吸入 上方循環葉輪並吹向加熱器,於接觸到加熱器之鎳 鉻絲高溫後,瞬間成為帶火星之燃燒顆粒,並持續 向上排出至烤箱上方熱排風管時,火星即接觸並附 著於熱排風管內壁之液態VOC,導致該液態VOC處開 始悶燒,並先產生大量煙再出焰燃燒,其後即於熱 排風管內快速沿管壁竄燒。當熱排風管起火燒穿管 壁後,火勢快速引燃熱排風管下方空調風管,致火 災產生之煙熱再藉空調風管吹送至該廠區5樓其他 區域(如圖8)。再因南側及東側外牆有酸排風管自1 樓連接至頂樓廢氣處理設備(如圖9),當5樓發生火 災時,火煙先在5樓蔓延,並由排風管往上延燒至頂 樓廢氣處理設備,頂樓火勢擴大後,會再沿排風管 及酸排風管迅速向下延燒至其他樓層(如圖10、圖 11),致各樓層均陷於火海中。平鎮三廠起火後,因 鎮三廠起火後,因 平鎮二廠增建至平 鎮三廠之防火間隔上之違章建築 鎮三廠之防火間隔上之違章建築 已將該2個廠區接連密合,且當時風向係西南風,平 鎮三廠於東側燃燒時,火勢即因風向而迅速向平鎮 鎮 二廠方向延燒。另因平鎮三廠東側外牆高樓層所掛 鎮三廠東側外牆高樓層所掛 置聚丙烯(PP)易燃材質排放廢氣,熱氣風管於當 日21時29分許燃燒熔毀時,所產生之高溫熔解碎屑 物陸續自高處墜下掉落於平鎮二廠 鎮二廠4樓易燃材質之 鐵皮搭建屋頂上,導致平鎮二廠 鎮二廠4樓鐵皮屋頂於當日 21時31分許開始燃燒,該鐵皮搭建屋頂全面燃燒 後,向下延燒到平 鎮二廠4樓內部。
13
資料來源:桃園市政府消防局火災原因調查鑑定書。 圖8 火災現場平 面圖(平鎮三廠 鎮三廠5樓)
14
圖9 平 鎮三廠外觀及排風管配置 鎮三廠外觀及排風管配置 圖
圖10 調閱搶救人員同步錄影畫 面,發現南側外部管道燃燒過 程中火焰有滴落情情,火焰滴 落到下方即造成下方燃燒(由 東向西拍攝) 資料來源:圖9為內政部「1070428桃園市敬鵬工廠火災全方位檢討策進專案報 告」、圖10為桃園市政府消防局火災原因調查鑑定書。
資料來源:內政部「1070428桃園市敬鵬工廠火災全方位檢討策進專案報告」。 圖11 敬鵬公司平鎮三廠火煙延燒路徑圖 鎮三廠火煙延燒路徑圖
15
(六)依桃園市政府消防局敬鵬公司平鎮三廠火災搶救報 鎮三廠火災搶救報 告書,該局於21時26分接獲該府警察局平鎮分局平 鎮派出所轉報工廠火警,其處置作為「山峰分隊於 21時26分接獲救災救護指揮中心通報,桃園市平鎮 鎮 區工業二路17號工廠火警,立即派遣山峰12、16、 61人員7名出動救災……」,而查桃園市政府消防局 消防APP系統(如圖12)附有敬鵬公司平鎮三廠 鎮三廠1樓 消防設備平面配置圖 面配置圖(如圖13),已清楚標示平鎮二 鎮二 廠、三廠樓層數不同,且其梯間及出入口位置亦已 清楚標示在內。再者,敬鵬公司平鎮二廠、三廠間 鎮二廠、三廠間 之防火間隔加蓋連通走道工程 1於92年3月3日完 工,此次火災後桃園地檢署於107年7月5日針對敬鵬 公司平鎮二廠 及平鎮三廠建築物公共安全現場會勘 鎮三廠建築物公共安全現場會勘 紀錄,伍、會勘結論:「一、敬鵬工業二、三廠分屬 兩宗建築基地,現場業將兩宗基地間原於使用執照 竣工圖標示之防火間隔退讓空間搭建違章構造,形 成內部空間供兩廠聯通使用。經勘查三廠在該違章 空間兩端各增設樓梯1座,其中1座(位於基地後方) 可連通兩廠各樓層;防火間隔範圍內之違章空間後 段(靠近樓梯處)設有一處貫穿外牆之大型排風 管……。」又經本院實地履勘及調查期間敬鵬公司 提具等相關資料(如圖14、圖15及圖16)顯示:該 公司平鎮二、三廠 鎮二、三廠完工時間不同,樓地板不等高, 落差約是7至8階樓梯,為便於通行,爰於平鎮三廠 鎮三廠 前方(北面、第一面)、後方(南面、第三面)各增 建樓梯一座,其中1樓高程相當而可直接互通(北面 有開口可連通,南面第三面之貨梯A旁通道及增建樓 梯處均可連通)。而2樓以上因樓層高度不同,於北
1 敬鵬公司平鎮二三廠連通走道工程, 鎮二三廠連通走道工程,工程合約內容,以平鎮二廠高度三層 鎮二廠高度三層RC結構建築,基 礎、一樓頂板、二樓頂板、三樓頂板等。
16
面(第一面)所增建樓梯僅可往平鎮二廠各樓層,但 鎮二廠各樓層,但 於南面(第三面)所增設之樓梯間雖可使二廠1樓2 樓與三廠1、2樓間、二廠3樓與三廠2、3樓間、二廠 4樓與三廠3樓間互通 2,但二廠4樓與三廠4樓或5樓 間,均無法互通。上述資料在在顯示平鎮二 鎮二、三廠 間因該工程而連接,且依上述桃園市政府消防局消 防APP系統及該公司提報消防平面配置圖示,均清楚 面配置圖示,均清楚 顯示平鎮二、三廠有別、電梯及避難梯之位置等相 鎮二、三廠有別、電梯及避難梯之位置等相 關資訊,樓層互通及其相關通道等情形均可於現場 洽詢關係人知悉。
資料來源:內政部「1070428桃園市敬鵬工廠火災全方位檢討策進專案報告」。 圖12 桃園市政府消防局消防APP系統就本案火災之截圖畫面
2 平 鎮三廠、二廠之北面 鎮三廠、二廠之北面2樓雖然便道,但僅為寬度80公分之維修通道,常人不利行走。
17
資料來源:桃園市政府消防局消防APP系統。 圖13 敬鵬公司提具之自衛消防編組訓練計畫內平鎮三廠 鎮三廠1樓消防設備平 面配置圖
18
備註:P2指帄鎮二廠、P3指帄鎮三廠。 資料來源:敬鵬公司。 圖14 敬鵬公司平鎮二廠、三廠之 鎮二廠、三廠之1樓連通情形
北面(第一面) 南面(第三面) 1F
19
備註:P2指帄鎮二廠、P3指帄鎮三廠。 資料來源:敬鵬公司。 圖15 敬鵬公司平鎮二廠、三廠之 鎮二廠、三廠之2樓連通情形
北面(第一面) 南面(第三面)
20
備註:P2指帄鎮二廠、P3指帄鎮三廠。 資料來源:敬鵬公司。 圖16 敬鵬公司平鎮二廠、三廠 鎮二廠、三廠間貨梯A旁之樓梯連通情形 (七)桃園地檢署詢問桃園市政府消防局初期救火指揮官 蘇文遠及接續指揮官陳宏銓之內容如下: 1、107年7月12日詢問蘇文遠筆錄: (1)(問:107年4月28日火災當晚,你是第一個到 達現場的消防隊指揮官,當初有無向敬鵬公司 索取公司的各樓層平面圖?)答: 面圖?)答:我們消防分 隊本來就有敬鵬公司的消防安全設備平面圖 面圖, 是儲存在我們分隊的列管電腦中,另外我的手 機是可以連線到我們分隊電腦中去瀏覽該消防 安全設備平面圖。又我到達現場時,敬鵬公司 面圖。又我到達現場時,敬鵬公司 的警衛有拿一份圖說給我,就是敬鵬公司的消 防安全設備平面圖, 面圖,……。 (2)(問:根據火災現場救災流程,到達現場時是 否需要向失火場地業主索取平面圖或消防配置 面圖或消防配置
21
或其他書面資料,以瞭解現場環境?)答:沒 有很明確要求……。原則上,一到火場,我們 會先找業主等關係人,詢問現場環境,且最好 由業主派人帶領我們進入火場,這是最快速瞭 解火場環境的方式……。 (3)(問:(提示敬鵬公司平鎮廠建築物安全檢查 鎮廠建築物安全檢查 圖)當晚有無見過這張圖說?)答:我不清楚。 就算有拿到,我也看不懂,因為我不是學建築 的,我只看得懂消防平面圖 面圖。 (4)(問:那如何得知敬鵬公司三廠的所有逃生出 入口?)答:消防安全設備平面圖有標示出入 面圖有標示出入 口。……我不知道進入火場的消防員布置水線 的方位,……且當時我得到的資訊,也無法讓 我清楚知悉三廠1樓有哪些出入口。 (5)(問:(提示3廠1樓平面圖)你當時是否知道三 面圖)你當時是否知道三 廠建築物的第2面與二廠建築物之間有防火區 隔?)答:我不知道,我當時看到三廠建物與 二廠建物相連接。所以我以為這2幢建物是相連 在一起的,且我當時也不知道三廠有哪些逃生 出入口,也無法與進入火場的消防員聯繫而知 悉他們的所在位置……。」 (6)(問:是否知悉三廠與二廠一到三樓的樓梯是相 通的?)我不清楚,但是每年春節過年前,我們 山峰分隊都會去宣導消防安全及演練,也許隊 員會知道……。 (7)(問:有沒有其他陳述?)我現在想起來,我2、 3年前曾經去做過消防宣導,在三廠、二廠交接 的2、3面樓梯,確實二個廠的樓梯是互通的。 (8)(問:本件火災,你與陳宏銓組長得知入室的同 仁在三廠內,有無尋找三廠的出入口,並通知
22
入室同仁?)答:一開始我與入室消防同仁還可 以用無線電通話……當撤退命令下達後,他們 有收到命令,但之後無線電整個失聯,在外面 的同仁就無法得知他們正確位置,且救災流程 並未要求現場指揮官要主動告知入室同仁廠區 之逃生出入口。 2、107年5月16日、8月6日詢問陳宏銓筆錄: (1)(問:交接完畢後,你如何指揮?)……交接後 (即21時48分),敬鵬公司自稱防火管理員蘇先 生跑過來,他表示2廠四樓疑似有1個外籍勞工 受困,當時我才知道敬鵬公司有分二廠跟三 廠……。 (2)(問:依據消防救災流,現場指揮官是否有義務 知道建築物的出入口?)答:原則上我們會先詢 問業主及關係人。我們的習慣是一定會瞭解現 場有多少出入口。 (3)(問:三廠有多少出入口?)答:我一直認為只 有警衛室第一面的入口,以及RIT救援中破壞第 一面鐵捲門後的出入口。第一時間我在第三面 時就排除第三面有出入口,因為第三面火勢很 大,且有圍籬及高低落差。 (4)(問:你到達現場時,有無問蘇分隊長三廠哪裡 有出入口?)答:我沒印象我有沒有問,我既有 的資料都是APP資料及廠方人員告知的。……後 來我回到第一面時,從蘇分隊長得知消防員還 沒撤出室內,我還有再跟廠方人員確認有無其 他出入口,但我不確定該人是否為蘇○○,該 員跟我說只有一個出入口。 (5)(問:蘇○○於107年7月13日庭訊表示,他帶幕 僚人員到二廠外面時,他說三廠有三個電梯及
23
兩個避難梯,有何意見?)答:我沒印象他有跟 我說過這訊息。 (6)(問:(提示蘇○○7月13日庭訊時所繪製三廠一 樓三個出入口平面圖 面圖)你至何時才知道三廠一 樓總共有三個避難出口?)答:我在現場有見過 這份消防設備安全圖,就是APP的圖,……且我 走回一面時有跟廠區人員確認出入口,得到答 案都是最初消員入室的那個入口。是事後我才 知道有三個出入口。 3、107年5月16日、11月6日詢問黃世忠筆錄: (1)(問:敬鵬公司火警,你何時到達現場?當時火 勢?進行那些調度?)答:當天我休假,大隊指 揮官陳宏銓組長聯繫我說轄區有二級火警,原 則上火警升級時,當班的消防員要到現場,但 我基於責任,還是立刻從家裡趕赴現場。…… 我就到第一面找大隊指揮官陳宏銓,陳宏銓告 知有七位同仁失聯,他已經啟動RIT,但當時是 否搶救人員已經入室搜救,要以陳宏銓所述為 主。……。 (2)(問:該七名受困消防員為何會入室搜救、救 災,原因為何?)答:我不清楚,要問初期指 揮官蘇文遠。 (3)(問:後續搶救這七名消防員情形如何?)答: 持續入內搜索,特搜大隊有四隊,他們陸續分 批,一批3至5位不等入內,要有幹部帶班,當 時是陳宏銓指揮搶救特搜大隊入內搜救,完全 由陳宏銓掌控,我則是在顧全整面的情況,包 括各面部署狀況、車輛部署、水源佔據狀況 等,……。 (4)(問:當時七名消防隊員入室被分配的勤務內容
24
為何?)答:我不清楚他們要救人或救災,要以 初期指揮官蘇文遠所述為主,至於為何會有三 個分隊的人入室之原因,應該也是由蘇文遠指 派。 (5)(問:火災發生當間即107.4.28晚上何時到達火 災現場?)答:當天晚上我是輪休,但火災發生 現場是我們第四大隊轄區,我在當天晚上約10 點10分之後到達現場……。我今日(即11月6 日)所陳述時間點都是我自己去查的……。 (6)(問:你與陳宏銓組長移交指揮權時,得到的訊 息為何?)答:陳宏銓組長告知我現場有7位同 仁失聯……。蘇文遠當時也在第一面,負責協 助陳宏銓分組指揮,又本局的119APP,裡面有 敬鵬公司的甲種圖即街道寬度、水源位置及敬 的乙種平面圖即每層的隔間狀況 面圖即每層的隔間狀況,當時我並沒 有拿到敬鵬公司的平面圖或相關建置資料 面圖或相關建置資料,我 不清楚敬鵬公司是否有提供該公司平面圖 面圖、消 防配置圖跟有毒化物質的擺放圖面給我們,但 我是從APP上面及大隊幕僚提供的資訊得知在 三廠五樓的第三面與第四面轉角處有擺放 2,400公升的柴油……。 4、據上,依作業要點規定,救火指揮官負責指揮人 命救助及火災搶救部署任務。上開筆錄顯示,火 場指揮官蘇文遠所屬山峰分隊之電腦中存有敬 鵬公司的消防安全設備平面圖 面圖(APP的圖),其手 機可連線電腦以瀏覽該圖,且其到達現場時,敬 鵬公司警衛曾拿該圖說給蘇文遠,蘇文遠可依該 圖及現場關係人知悉火場建築之出入口、樓梯、 電梯等基本資料,且該分隊104年1月13日至敬鵬 公司平鎮二、三廠執行消防安全檢查之紀錄表載 鎮二、三廠執行消防安全檢查之紀錄表載
25
明,檢查人員為李姓隊員及蘇文遠小隊長,在地 檢署偵查時,蘇文遠竟稱:我以為這2幢建物是 相連在一起的,不知道三廠有哪些逃生出入口, 且當時我得到的資訊,也無法讓我清楚知悉三廠 1樓有哪些出入口,我不知道進入火場的消防員 布置水線的方位,我現在想起來,我2、3年前曾 經去做過消防宣導,在三廠、二廠交接的2、3面 樓梯,確實二個廠的樓梯是互通的等語。交接的 火場指揮官陳宏銓亦稱:我既有的資料都是APP 資料及廠方人員告知的,我一直認為只有警衛室 第一面的入口,以及RIT救援中破壞第一面鐵捲 門後的出入口,第一時間我在第三面時就排除第 三面有出入口,因為第三面火勢很大,且有圍籬 及高低落差,我在現場有見過這份消防設備安全 圖,就是APP的圖,是事後我才知道有三個出入 口等語。其後再交接的火場指揮官黃世忠亦稱: 該局APP有甲乙種平面圖 面圖,當時沒有拿到敬鵬公 司的平面圖 面圖,亦不清楚敬鵬公司是否提供該公司 平 面圖 面圖,其係顧全整面並由陳宏銓掌控入內搜救 等語。上開證據顯示火場指揮官均未能詳閱消防 安全設備平面圖及仔細詢問現場關係人以明瞭 面圖及仔細詢問現場關係人以明瞭 各樓梯間、出入口位置及樓層互通等情形,致其 等執行職務時,不知悉火場建築物有二廠、三廠 之區別,不知道三廠1樓共有三個逃生出入口, 以為只有一個位於第一面(北面)之出入口,所以 不僅未指導消防員選擇最有利的出入口部署水 線,竟稱其不知道進入火場消防員布置水線的方 位,而且在消防員受困後,無法利用各個出入口 與進入火場的消防員聯繫並進行搶救,實有不 當。
26
(八)次查,圖3之救災及救援動線圖顯示,黃色線所顯示 之水線部署是採ㄇ字形之最長路徑:從三廠1樓第1 面(北面)位於東北角之出入口進入,直走後轉彎到 第4面(西面),直行後轉彎到第3面(北面),直行到 東南角後,上樓梯到5樓。惟依該附圖及附圖17(消 防設備平面配置圖 面配置圖)所示,該樓梯旁有A貨梯,A貨 梯旁位於有一位於東南角之出入口可直通二廠與 三廠間之通道。因指揮官不知有東南角出入口,所 以未能指揮消防員水線部署,由東南角出入口進入 直通東南角樓梯上樓之捷徑,而是由東北角進入繞 行西面再至東南角樓梯上樓之ㄇ字形之最長路 徑,並非妥適。 (九)再者,圖3顯示,消防員均受困於東南角A貨梯附近, 因指揮官不知有A貨梯旁有東南角出入口,故未能 利用該出入口進行救援,而是由東北角處入出口進 入沿水線ㄇ字形路徑救援。桃園市政府查復表示: 「第一梯次入室同仁救災動線係依廠方人員提供 資訊,此乃國內防火管理制度中自衛消防編組應變 應辦理事項。後續入室之梯次(含RIT),因二、三 廠間為封閉結構且有大型風管,且該風管有延燒情 形已屬事實,若選擇該東南側A貨梯旁出口,必然 造成消防人員更大死傷。」惟查,二廠及三廠間之 通道主要為換鞋區,且其加蓋之混凝土構造物於1 樓入口前段遭火勢波及尚屬有限,該通道後段因風 管延伸至1樓而有火勢蔓延,然三廠1樓內之製程設 備及其附掛管線相對複雜,該廠南面更因多支風管 貫穿入1樓內致火勢相形猛烈。7人受困於東南角 落,A貨梯旁東南出入口非常接近受困人員。據敬 鵬公司提供圖說及資料,貨梯A旁之電動門仍可以 人力手動推開,亦可另藉東南側樓梯間可連通二廠
27
一樓至三樓並通往外面的出口(同圖14至圖16),3 位指揮官均未知悉A貨梯旁出入口,故從未評估該 出入口部署水線及救援之可行性,且該入口與隊員 受困只有幾步路遙,堪稱最佳救援位置,二、三廠 間通道縱為封閉結構且有大型風管,但該通道係位 於三廠外部且有開口直通二、三廠外部道路,其封 閉程度顯遠低於全部位於廠內之ㄇ字形水線路 徑,而東面雖有一支大型風管,但其開口係伸入廠 內,其在通道上造成之火勢衡情亦小於多支風管伸 入之廠內。桃園市政府事後徒以「因二、三廠間為 封閉結構且有大型風管,且該風管有延燒情形已屬 事實」為由,遽下「若選擇該東南側A貨梯旁出口, 必然造成消防人員更大死傷」之結論,並無可採。 (十)綜上,救火指揮官依法負責指揮人命救助及火災搶 救部署任務。107年4月28日21時許桃園市敬鵬公司 平鎮三廠發生火警,起火點位於平 鎮三廠 鎮三廠5樓。火 場指揮官蘇文遠、陳宏銓、黃世忠陸續抵達現場 後,均未詳閱敬鵬公司之消防安全設備平面圖,亦 面圖,亦 未仔細詢問敬鵬公司人員,故不知火場建築有二 廠、三廠之分,亦不知三廠東北、東南、西北面共 有三個出入口,以為只有一個出入口位於東北面, 所以未能指揮消防員水線部署,採取由東南角出入 口進入直通東南角樓梯上樓之捷徑,而是採取由東 北角出入口進入繞行西面再至東南角樓梯上樓之 ㄇ字形之最長路徑,且導致嗣後7名消防員受困於 東南角A貨梯附近時,未能利用近在咫尺之東南角 出入口進行通訊聯絡及快速進入救援,而是由東北 角出入口進入沿水線繞ㄇ字形長路救援,造成因救 援路程太遠及機具阻隔而難以搶救,6名隊員不幸 喪生,核有明確違失。
28
二、敬鵬公司平鎮二廠 鎮二廠4樓加蓋鐵皮屋供作員工宿舍使 用,二、三廠其他區域均為工廠,火災發生於假日夜 間,員工於宿舍內受困待援之可能性顯然高於工廠作 業範圍。惟初期救火指揮官蘇文遠因未能詳閱消防安 全設備平面圖及仔細詢問現場關係人,不知火場建築 面圖及仔細詢問現場關係人,不知火場建築 物有二廠、三廠之區別,亦不知二廠4樓為宿舍區, 故其雖派員進入三廠救災,卻未曾派員前往二廠4樓 宿舍區搜索。火場管制人員詹勝喜雖於21時44分因得 知2廠4樓有泰籍勞工後由敬鵬公司人員引導查看,惟 其並非蘇文遠所指派,且其前往查看時,以二廠外觀 尚無明顯火勢為由,而未依規定攜空氣呼吸器,嗣於 現場遭遇火舌自樓梯窗戶竄出等狀況而退出,蘇文遠 未曾掌握隊員詹勝喜作為,辯稱:詹勝喜沒有跟我回 報,上去前可能有跟我回報,但因為無線電干擾我不 知道這件事等語。分隊長楊肅強與隊員於22時10分至 二廠4樓搜尋外籍勞工,因現場火勢而撤退,故消防 員2次進入二廠4樓均未能確認有無人員受困在內,終 至火勢迅速蔓延擴大後而難以救援,肇致該公司外籍 勞工帕努朋及車沙喪生火場,於災後遭致外界「救錯 棟」之批評,核有違失。 (一)依作業要點規定,初期救火指揮官到達火場應立即 瞭解火場現況及受困災民等,並回報指揮中心,且 以人命搜救為優先 3。依該作業要點第3點規定,救
3 消防機關火場指揮及搶救作業要點:七、火災搶救作業要領:(五)抵達火場處置:……7. 人命搜救:抵達火場後,優先進行人命搜救任務。(1)第一梯次抵達火場之救災人、車, 優先進行人命搜救任務,水源部署應掩護搜救任務之進行。(2)搜救小組應以兩人以上為 一組,以起火層及其直上層為優先搜救目標,樓梯、走道、窗邊、屋角、陽台、浴廁、電 梯間等,應列為搜救重點。(3)由指揮官分配各搜索小組搜索區域、聯絡信號,入室搜索 前應先登錄管制搜救小組「姓名」、「人數」、「時間」、「氣瓶壓力」,每一區域搜索完畢後, 需標註記號,以避免重複搜索或遺漏搜索。(4)入室搜索應伴隨水線掩護,並預留緊急脫 離路線。(5)設有電梯處所發生火警時,應立即將所有電梯管制至地面層,以防止民眾誤 乘電梯,並協助避難。(6)對被搜救出災民實施必要之緊急救護程序,並同時以救護車(情 況緊急時得採用各式交通工具)儘速送往醫療機構急救。
29
火指揮官負責指揮人命救助及火災搶救部署任 務。同作業要點第7點火災搶救作業要領規定,救 火指揮官於抵達火場處置應立即瞭解火場現況並 掌握受困災民位置,並規範:「人命搜救:抵達火 場後,優先進行人命搜救任務。(1)第一梯次抵達 火場之救災人、車,優先進行人命搜救任務,水源 部署應掩護搜救任務之進行。(2)搜救小組應以兩 人以上為一組,以起火層及其直上層為優先搜救目 標,樓梯、走道、窗邊、屋角、陽台、浴廁、電梯 間等,應列為搜救重點。(3)由指揮官分配各搜索 小組搜索區域、聯絡信號,入室搜索前應先登錄管 制搜救小組『』姓名』、『人數』、『時間』、『氣瓶壓 力』,每一區域搜索完畢後,需標註記號,以避免 重複搜索或遺漏搜索。(4)入室搜索應伴隨水線掩 護,並預留緊急脫離路線。」 (二)「消防人員救災安全手冊」(五版)第8章入室搜救安 全指導原則前言載明:「入室搜救應先評估整體環 境再擬定救援計畫,在人命救助、消防人員安全和 救援優先的前提下,依據火場狀況及受困者位置, 規劃進入與撤離路線,消防人員在穿著完整個人防 護裝備、攜帶適當搜救器材及水線防護的安全狀態 下,才能執行入室搜救任務。」、「三、安全注意事 項(一)蒐集相關資訊:搜救行動除必須蒐集受困 蒐集受困 者之情報外,可經由消防乙種搶救圖或詢問現場關 係人,預先了解室內格局、擺設、隔間裝潢、搶救 危險程度、搶救優先順序以及是否有危險物品儲放 物品儲放 後,選擇最有利的路線進入,並預先考慮退路所需 時間。」消防署訓練中心專業教材火災搶救第11章 火場人命搜索及救助內容:「消防員要進入要搜索 的建築物之前,要進行評估以搞清楚『救援計畫』,
30
清晰的救援計畫協助消防人員依據火場狀況,將可 能有受困者的位置區域排列優先順序,同時規劃進 入及撤離路線。在人命搜救、消防人員安全及救援 優先的前提下,建築物火中有很多區域因火災情況 嚴重或是有建築物坍塌可能性,幾乎不可能拯救受 困者或是不需要搜索的,這種情形美國人稱為復原 環境(recover environment),所謂復原環境就是 指,該區域煙熱情況一個人員幾乎沒辦法生存環 境,或建 築物有倒塌危險可能危及消防安全的環 可能危及消防安全的環 境,換句話說,就是無法進行搶救只能防守並等待 善後的環境。確認救援計畫時應考慮到下列因素, 以判別是否有受困者的跡象或是其位置在哪,包 括:(一)場所型式和發生的時間:1、住宅中可能 一整天都有人在裡面,尤其是睡眠時間,就可以很 合理的懷疑裡面應該會有人待救。2、商業用建築 物在睡眠時段就很少有人在,所以發生火災時,民 眾大都能夠自己逃生。」 (三)桃園地檢署107年11月6日詢問蘇文遠筆錄記載: 「(問:七位同仁進入的目的為何?)人命搜救。當 時廠方守衛說裡面疑似有一名外籍勞工受困。」、 107年5月16日詢問筆錄記載:「(問:基本上,何種 情況下可以進入火災現場布水線或救災?)答:這 是委由初期指揮官在現場判斷,以敬鵬公司來說, 當時一樓燈火通明,無任何火焰,且敬鵬公司警 衛、員工當時有跟我說他們有員工困在四樓裡面, 而五樓火警,但他們未清楚指出是在二廠或三廠, 當時敬鵬公司人員還在二廠、三廠進進出出,員工 出入口就是敬鵬公司員工打卡的出入口(即位於三 廠警衛室旁)……因為當時很混亂,我不確定三廠 一樓是否還有其他出入口,所以我只看這一面的出
31
入口,我當時有詢問敬鵬公司員工有無確實清點人 數……等會我們同仁會入室佈線,請敬鵬公司員工 引導帶領我們去尋找受困員工,佈線消防員也同時 要負責救人。」 (四)惟查,桃園地檢署於107年7月13日詢問蘇○○筆錄 記載:「然後就有另一名消防隊員,後來得知他是 第四大隊幕僚人員,他問我三廠除了警衛室後方的 門口可以進入外,從外圍還有哪裡可以進入二廠4 樓,於是我就帶這位幕僚人員從外圍意即工業二路 繞到二廠第2面及第3面的交岔口有個安全門(在圖 示上標示位置 4),此門可以通到二廠4樓,但因為安 全門是從裡面才打的開,我們只好照原路折返一樓 警衛室門口後方的大門……,我退出後台電人員恰 好要來斷電,應該是9時56分許,接下來舍監字○ ○告訴我二廠4樓有1名外籍勞工受困,我要他從外 勞住宿證中指給我,是哪名外籍勞工,及確認是哪 間宿舍,之後我就拍該外籍勞工住宿證,當時是10 時10分,我就請4名消防人員跟我一起去二廠4樓, 是從警衛室後方的二廠樓梯進入……。」依桃園市 政府消防局火災原因調查鑑定書談話筆錄、桃園地 檢署卷證及本院實地履勘並詢問敬鵬公司人員,斯 時敬鵬公司平鎮三廠值班警衛陳 鎮三廠值班警衛陳○○、平鎮二廠警 鎮二廠警 衛蔡○○等2人均未表示:「有員工受困」,而敬鵬 公司宿舍管理員(或稱舍監)字○○表示於宿舍叫 人撤離,22時左右於樓下清點人數知道少1個人, 22時10分確定少2個人,並告知該公司防火管理人 蘇○○。再者,人命搜救以起火層及直上層為優先 搜救目標係作業要點所明訂,本案火場起火點位於
4 該圖示所標示位置為1樓。
32
平 鎮三廠 鎮三廠5樓,該層及其直上層均為作業區域,且 已在進行人員疏散,而初期獲知訊息為「員工困在 四樓裡面」,已為起火層下方,入室消防人員斯時 已佈設水線至平鎮三廠 鎮三廠5樓,與其所獲受困位置之 訊息亦不相符。 (五)再查,桃園地檢署於107年5月21日詢問桃園市政府 消防局詹勝喜筆錄記載:「(問:當時進入三廠一樓 消防員人數?)共7名,……當時因為有民眾跟我說 樓上有需要協助,加上人手不足,只有3人在第一 面入口水庫車旁,所我離開管制板那邊跟著民眾上 去樓上……」、「(問:你所謂樓上是指何處?)我說 的是緊鄰失火的那棟建築物,從警衛室後面的樓梯 進入……我事後才知道我進入的是二廠,我到樓上 後因為遇到有火舌自樓梯窗戶竄出,所以就下樓, 因為當時該棟建築物並無火勢,所以我沒有背空氣 呼吸器就進入,後來下樓後我又回到第一面。」桃 園市政府消防局火災原因鑑定書中敬鵬公司魏○ ○於消防局之談話筆錄記載:「答:得知火災後我 立刻回到現場,我大約21時30分許到達……之後我 有上去宿舍4樓察看,此時看到宿舍4樓內有火…… 後來現場外勞宿舍樓梯間爆裂,我就回到1樓警衛 室避難。」、「答:得知火災後我就立刻趕往現場。 抵達時消防人員也剛到場。我先進入3廠,在1樓梯 間電話連絡防焊課的同事,羅○○告訴我人員已疏 散,我就退出3廠,後來得知2廠4樓仍有泰籍勞工 在裡面,於是我就和許○○引導1位消防人員到4樓 宿舍察看。」、「答:當時我們3人前進至4樓宿舍門 口附近,看見火已燃燒至宿舍鄰近3廠側位置,現 場情勢危急,消防人員立刻叫我們撤退,我們3人 就一起下樓。」本院於108年7月8日詢問筆錄記載:
33
「蘇文遠小隊長答:……魏○○課長所述,所帶領 的1名消防局人員是我們第一台車的司機詹勝喜。 這名跟魏○○課長上去宿舍的司機並非我指派,也 沒有跟我回報這件事,他上去前可能有跟我回報, 但因為無線電干擾我不知道這件事。」敬鵬公司於 本院詢問時提出之書面及監視器畫面資料指出:「9 時41分時,魏○○至二廠4樓宿舍查看有否外籍勞 工未撤出,於樓梯間見2、3樓窗外已有火勢,魏○ ○即先退至1樓請消防員協助,約9時44分,魏○○ 及許○○引導1位消防員進二廠4樓宿舍查看。」可 見斯時敬鵬公司已有人員前往該公司平鎮二廠 鎮二廠4樓 宿舍查看有無受困員工,但救火初期指揮官蘇文遠 對此前往宿舍區進行查看作為未曾掌握,亦未派員 前往宿舍區搜索有無受困員工,此有等內容可證。 (六)桃園地檢署起訴書載明:「敬鵬公司平鎮二廠 鎮二廠4樓開 始燃燒後,敬鵬公司安全衛生管理師兼火災管理人 蘇○○向陳宏銓表示疑似有外籍勞工受困於二廠4 樓宿舍區,陳宏銓即於證人蘇○○引導下至二廠4 樓勘驗火災情況,然因該廠區4樓的安全門需從內 部打開,其等無法開啟進入,遂照原路返回三廠1 樓警衛室,至同日晚間10時10分許,敬鵬公司確認 失聯外籍勞工係車沙及帕努朋後,陳宏銓除於同日 22時10分許啟動RIT搜救人員入室救援外,另於同 日22時15分許指揮第二搜救救助分隊分隊長楊肅 強與隊員至二廠4樓搜尋外籍勞工,但因該宿舍區 溫度太高無法入內搜救,同廠區3樓入口已鎖住亦 無法進入,只能撤退,其後因三廠全面燃燒,搜救 過程困難。」是起訴書所載敬鵬公司蘇○○該所述 「疑似有外籍勞工受困」之時點,係為指揮權移轉 至桃園市政府消防局陳宏銓時間21時48分之後,而
34
敬鵬公司魏○○分別於21時41分至宿舍查看、21時 44分引導桃園市消防員詹勝喜亦未尚能確認有無 人員受困,則該局初期指揮官蘇文遠於21時32分許 抵達火場時所獲知「疑似有外籍勞工受困」之訊 息,敬鵬公司警衛均已否認,則火場初期(21時32 分至21時48分間)究係由敬鵬公司員工何人告知該 訊息,已難以證實釐清,但於上述欲前往平鎮二廠 鎮二廠 4樓宿舍區確認受困員工乙事,顯然其受困位置係 位於平鎮二廠 鎮二廠4樓,而非平鎮三廠 鎮三廠。 (七)本案事件發生後,桃園市政府消防局於斯時回應外 界質疑「救錯棟」之疑慮時表示:「起初不能確定 失聯移工的位置,當時狀況是回報找不到人,於是 從三廠1樓往三廠4樓作業區搜尋,此外三廠4樓也 可以通二廠4樓宿舍。 5」惟本案倖存消防員呂宗郁 接受詢問時表示:「一開始到現場的時候不知道有 二廠及三廠,只知道已有明火在燒的這棟建築物 (且進入該棟),事後才知道有分二廠及三廠。進 去時,不知道有人受困,因為我們不是第一梯進入 火場的,至於第一梯山峰的學長有沒有接收到有人 受困的訊息,我不曉得。」本院實地履勘及調查期 間敬鵬公司提具相關資料(同圖22)發現:平 鎮二 鎮二、 三廠間雖已增建樓梯,其樓層高度有明顯落差,而 不能由平 鎮三廠 鎮三廠4樓直通二廠4樓宿舍,必須藉由 藉由原 樓梯先自平鎮三廠 鎮三廠4樓往下至該廠3樓後,再由增建 樓梯自該廠3樓向上始能抵達二廠4樓宿舍區,而斯 時入室人員已達三廠5樓位置,可證其等並非前往 平 鎮二廠宿舍區 鎮二廠宿舍區。 (八)審視桃園市政府消防局就本案員工因火場受困於平
5 107年4月29日中時新聞報導「敬鵬火警釀死傷 市議員批評:主管提供錯誤資訊釀意外」, 資料來源:https://www.chinatimes.com/realtimenews/20180429001638-260402?chdtv。
35
鎮二廠4樓宿舍區之搜救作為,桃園市政府消防局 消防員曾2度進入平鎮二廠 鎮二廠4樓:第1次為21時44分 由敬鵬公司員工引導消防局山峰分隊隊員詹勝喜 (擔任火場管制板人員及山峰61司機),斯時平鎮 鎮 二廠尚無火勢,但因未攜空氣呼吸器及現場狀況而 退出,當時指揮官蘇文遠未曾掌握其作為。第2次 為22時10分消防局第二搜救救助分隊分隊長楊肅 強與隊員至二廠4樓搜尋外籍勞工,因現場火勢而 撤退。其間約於21時50分由敬鵬公司防火管理人引 導桃園市政府消防局組長陳宏銓至平鎮二廠 鎮二廠4樓勘 驗火災情況,但因安全門未能開啟而退出。 (九)上述搜索作為均未能完成執行人命搜救,第1次擔任 火場管制官詹勝喜前往宿舍區時非救火指揮官所 指派,詹勝喜既已前往宿舍區查看,其位於火場正 面(第一面)時,可經由電線電回報或當面報告, 初期指揮官蘇文遠未曾掌握隊員詹勝喜作為,辯 稱:「這名跟魏○○課長上去宿舍的司機並非我指 派,也沒有跟我回報這件事,他上去前可能有跟我 回報,但因為無線電干擾我不知道這件事」等語。 且蘇文遠未能明察其工廠作業區及宿舍區之用途 差異,以安排搜救行動,雖派員進入火場,但係因 起火點於平鎮三廠而指揮佈設水線救災,而非針對 鎮三廠而指揮佈設水線救災,而非針對 宿舍區可能受困員工進行人命救助,嗣後亦未能確 認有無員工受困,顯與作業要點之到達火場應確認 受困災民、以及救火指揮官負責指揮人命救助之規 範要旨不符,復與消防人員應切實依場所型式判斷 待救民眾(員工)之教育訓練內容相左,確有疏失。 (十)綜上,敬鵬公司平鎮二廠 鎮二廠4樓加蓋鐵皮屋供作員工宿 舍使用,該廠其他區域及三廠均為工廠,火災發生 於假日夜間,員工於宿舍內受困待援之可能性顯然
36
高於工廠作業範圍。惟初期救火指揮官蘇文遠因未 能詳閱消防安全設備平面圖及仔細詢問 面圖及仔細詢問現場關係 人,不知火場建築物有二廠、三廠之區別,亦未查 明工廠作業區及宿舍區,故其雖派員進入三廠救 災,卻未曾派員前往二廠4樓宿舍區搜索。火場管 制人員詹勝喜雖於21時44分因得知2廠4樓有泰籍 勞工後由敬鵬公司人員引導查看,惟其並非蘇文遠 所指派,且其前往查看時,以二廠外觀尚無明顯火 勢為由,而未依規定攜空氣呼吸器,嗣於現場遭遇 火舌自樓梯窗戶竄出等狀況而退出,蘇文遠未曾掌 握隊員詹勝喜作為,辯稱:詹勝喜沒有跟我回報, 上去前可能有跟我回報,但因為無線電干擾我不知 道這件事等語。分隊長楊肅強與隊員於22時10分至 二廠4樓搜尋外籍勞工,因現場火勢而撤退,故消 防員2次進入二廠4樓均未能確認有無人員受困在 內,終至火勢迅速蔓延擴大後而難以救援,肇致該 公司外籍員工帕努朋及車沙喪生火場,於災後遭致 外界「救錯棟」之批評,核有違失。 三、敬鵬公司平鎮廠 鎮廠火災之起火點位於三廠5樓,先沿東 面外牆排風管向上燒至頂樓,再由頂樓沿東面、南面 排風管快速向下延燒至低樓層,其延燒路徑自建築物 外觀可輕易判斷,惟依通聯譯文及火場影片,救火指 揮官於是日21時42分已知全面燃燒,卻遲至21時57分 始通知入室人員撤出,肇致入室人員持續深入火場, 陷於險境卻渾然未覺,核其未能掌握火勢發展狀況, 境卻渾然未覺,核其未能掌握火勢發展狀況, 指揮調度失措,難卸疏失之責。 (一)救火指揮官應掌握火場狀況並負有負責指揮人命救 助及火災搶救部署任務等指揮調度之責,前已敘 明。據本案搶救報告、偵查卷證、無線電及有線電 通聯譯文、消防員密錄器、敬鵬公司提具佐證資料
37
及影片等,火場初期至入室人員撤退之火場狀況及 其指揮調度情形如下: 1、21時31分:山峰分隊代理分隊長蘇文遠出勤途 中(工業二路上),見報案地點高樓層處冒出大 量火煙,請求加派人車及大隊支援。 2、21時32分:山峰分隊代理分隊長蘇文遠到達現 場,確認起火場所回報為敬鵬公司。火煙約自場 所4樓竄出,請求雲梯車支援。 3、21時32分:確定5樓起火。 4、21時34分:敬鵬公司工程師至頂樓查看,發現連 接5樓排風管之廢氣處理設備已全面燃燒,呈現 一片火海狀況(內政部專案報告頁10)。 5、21時42分:山峰代理分隊長蘇文遠回報現場室內 有聽到全面燃燒的聲音,指示入室人員如有必要 可視情況先撤退。桃園市政府消防局山峰有線電 話錄音 6:「地上八樓地下三樓,現場全面燃燒(四 大隊)」。 6、21時43分:桃園市政府消防局山峰有線電話錄音 7:「全面燃燒,沒有人員受困受傷」。 7、21時46分:火場第三面平 鎮 鎮213抵達現場,消防 局人員密錄器對話內容:「(現場消防員對平鎮 鎮 213說明)不要靠太近,不要靠太近,上面一直掉 下來(指火星)」、「第一次看到這樣的」、「全面 燃燒啊」、「幫忙負責守住這邊」,依錄影畫面可 見第三面之地面層已有火光。並依桃園市政府消 防局檢討報告(頁23)於第三面架設砲塔僅受指 示為周界防護。 8、21時50分~51分:桃園市政府消防局消防員密錄
6 桃園地檢署偵查卷證(107年5月13日勘驗山峰有線電話錄音光碟)。 7 桃園地檢署偵查卷證(107年5月13日勘驗山峰有線電話錄音光碟)。
38
器畫面,火場第二面及第三面風管已往下延燒。 9、21時53分:桃園市政府消防局山峰有線電話錄音 8:「局長指示要升為三級火警,廠房全面燃燒。」 10、21時54分:桃園市政府消防局消防員密錄器畫 面,第三面火勢已達3層樓高。山峰代理分隊長 蘇文遠呼叫平鎮小隊長李翰霖,現場第三棟 鎮小隊長李翰霖,現場第三棟5樓 及第二棟4樓已開始有燃燒情形,請人員注意安 全。平鎮小隊長李翰霖回復收到,且目前位置在 鎮小隊長李翰霖回復收到,且目前位置在 5樓。 11、21時55分:桃園市政府消防局山峰有線電話錄 音 9:「火警無法控制,要升為三級火警」。 12、21時55分59秒:台電人員到達警衛室門口,與 廠方人員由警衛室後方樓梯上樓。 13、21時56分:火勢擴大,三廠開始全面燃燒,指 揮官下達人員撤出;四大組長陳宏銓查看火場周 遭過程,發現第三面頂樓火勢迅速沿第三面外牆 向下延燒,遂呼叫位於第一面之山峰代理分隊長 蘇文遠,後側1樓到頂樓全部都在燃燒,請救災 人員撤出。 14、21時57分:山峰代理分隊長蘇文遠指示入室人 員全員撤出。 15、21時57分07秒:山峰代理分隊長蘇文遠指示入 室人員儘速撤出;埔心小隊長回復要撤退嗎?山 峰代理分隊長蘇文遠回復麻煩請埔心小隊長及 入室同仁先撤退出來。 16、21時58分27秒:埔心小隊長回應正在撤退中。 (二)依本案火場火勢變化情形,可知於初期救火指揮官 於出勤至21時32分抵達現場即可知高樓層冒出大
8 桃園地檢署偵查卷證(107年5月13日勘驗山峰有線電話錄音光碟)。 9 桃園地檢署偵查卷證(107年5月13日勘驗山峰有線電話錄音光碟)。
39
量火煙及起火點位於5樓,並於21時42分已有「全 面燃燒」情形,嗣後於21時50分起,建築物外風管 已往下延燒,顯見火勢快速蔓延。但初期救火救火 指揮官於21時42分僅告知入室人員自行判斷,顯示 當時建築物室外及室內面臨之火場狀況差異甚 大,室內應尚未斷電且仍屬燈火通明,低樓層尚未 及感受火勢延燒且已有火星掉落,並引起地面已有 火光及快速延燒情形,至21時53分已將火場升級為 三級火警、廠房全面燃燒,救火指揮官未能下令入 室人員撤出,及至21時56分至57分才發現火勢擴大 而要求救災人員撤出。是該局救火指揮官未能即時 掌握火勢快速延燒,並就該火勢發展對入室人員作 及時且適切之指揮調度,肇致入室人員持續深入火 場,陷於險境卻渾然未覺 境卻渾然未覺。縱使火災現場訊息混 雜,但火場各面均已佈署消防人員,建築物外觀明 顯可見火勢快速向下延燒,現場救火指揮官當應確 實掌握現場各項資訊,做為指揮調度之依據,然本 案該府消防局指揮官於火災現場及火勢延燒範圍 等基本狀況之掌握顯有疏失,指揮調度處置失措, 難卸疏失之責。 (三)綜上,敬鵬公司平鎮廠火災之起火點位於三廠 鎮廠火災之起火點位於三廠5樓, 先沿東面外牆排風管向上燒至頂樓,再由頂樓沿東 面、南面排風管快速向下延燒至低樓層,其延燒路 徑自建築物外觀可輕易判斷,惟依通聯譯文及火場 影片,救火指揮官於是日21時42分已知全面燃燒, 卻遲至21時57分始通知入室人員撤出,肇致入室人 員持續深入火場,陷於險境卻渾然未覺,核其未能 境卻渾然未覺,核其未能 掌握火勢發展狀況,指揮調度失措,難卸疏失之責。
40
綜上所述,桃園市政府於本案敬鵬公司平鎮三廠火 鎮三廠火 災之火場現況掌握、人命搜救及指揮調度作為,確有怠 失,爰依憲法第97條第1項及監察法第24條之規定提案糾 正,移送行政院轉飭所屬確實檢討改善見復。 提案委員:高鳳以 章仁香
中 華 民 國 1 0 9 年 2 月 1 8 日
FD06176 | 2018_台湾_桃园敬鹏工厂火灾_监察院调查报告.pdf
分类:06_境外及港澳台调查报告 | 年份:2018 | 地域:台湾 | 严重程度: | 场所:厂房/车间 | 起火原因:电气 | 来源格式:pdf
敬鵬公司大火案:平鎮二、三廠樓層高度差異 1樓 2樓 5樓 4樓 3樓 北面(第一面) 1樓 2樓 3樓 大門(警衛室) 4樓 三廠 南面(第三面) 1樓 2樓 3樓 三廠 三廠東南角 增建梯間 二廠 二廠 三廠 二廠 資料來源:桃園市政府消防局就本案鑑定報告、敬鵬公司及 本院依調查所得資料製作。
敬鵬公司建物外牆附掛風管、延燒及火勢 2 三廠-東面 三廠 -南面 三廠-東面 三廠-東面 三廠 -南面 二廠 三廠 北面(第一面) 南面(第三面) 二廠 三廠 東面(第二面) 外掛風管均為可燃之聚丙烯(PP)材質 約21:56 由東南角拍攝 資料來源:內政部「1070428桃園市敬鵬工廠火災全方位檢討策進專案報告」及本院依調查所得資料製作。
二廠-4層 (4樓加蓋鐵皮 做外勞宿舍) 北(第一面) 起火點 (三廠5樓) 東 (第二面) 南(第三面) 西 (第四面) 三廠-8層 大門(警衛室) 敬鵬大火案-時序摘述 107年4月28日 21時15分-敬鵬公司火災警報警起 21時26分-消防局獲報 21時32分-消防局到達現場 21時42分-指揮官蘇文遠回報全面燃燒 21時44分-消防員至二廠4樓, 但未攜呼吸器且遇火舌而退出 21時50分-指揮官陳宏銓至二廠外圍因 安全門未開啟而無法進入 21時56分-指揮官陳宏銓下達人員撤出 21時57分-指揮官蘇文遠指示全員撤出 22時10分-啟動緊急應變救援小組(RIT) 、消防局至二廠4樓因火勢退出 107年4月29日 0時14分-發現受困消防員 0時29分-將隊員呂宗郁拉到出口 0時51分-救出第1名受困消防員(生還) 4時53分-救出第7名受困消防員(死亡) 5時6分、5時53分-2名外籍勞工(死亡) 東面風管 南面風管 外勞(4F) 資料來源:桃園市政府消防局就本案鑑定報告及本院依調查所得資料製作。
防 火 間 隔 換 鞋 區 二廠 三廠 貨梯 A 外勞 二廠4樓 ⻄北⾯ 出入口 東北面 出入口 東南面 出入口 大門(警衛室) 安全門 消防局搜尋外勞 (警衛室旁樓梯前往二廠4樓) 第1次:21時44分 未攜呼吸器且遇火舌而退出 第2次:22時10分 因火勢而撤退 約21時50分 敬鵬引導指揮官 陳宏銓,因外圍 安全門未能開啟 而無法進入 5 4 2 6 7 1 3 起火點 (三廠5樓) 風 管 互通 消防員 三廠1樓 一樓平面圖 風管 互通 二、三廠互通 最短路徑 佈線及RIT路徑 救援小組救援路徑 救援小組水線路徑 分隊水線路徑 資料來源:本院依調查所得 資料製作。
5 消防APP系統-平鎮三廠1F消防安全設備圖 桃園市政府消防局消防APP系統:平鎮三廠平面圖及出入口: 東北、東南、西北面共有三個出入口 接二廠 接二廠 貨梯A 大門 警衛室
FD06177 | 2019_台湾_台中大雅違章工廠火災_監察院糾正案文.pdf
分类:06_境外及港澳台调查报告 | 年份:2019 | 地域:台湾 | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
1
糾 正 案 文
壹、被糾正機關:臺中市政府。 貳、案 由:臺中市大雅區中和六路92-7號農地違章工 廠,於108年10月3日發生火災,並延燒至 同為鐵皮建築,與火場間隔8米車道,上 方設有人字型屋頂之92-6號,經查臺中市 政府於104年8月即認定屬新違建,迄發生 火災,均未依規定處罰鍰或命其停止使用 或拆除;另火災搶救,未諳消防人員救災 安全手冊第19-2章所述鐵皮建築物災害 特性,於92-7號已全面燃燒,92-6號內部 無人受困,且無水線伴隨情況下,仍派員 入室監測煙熱任務,造成2位消防員殉 職,均有違失,爰依法提案糾正。 參、事實與理由: 本案群峪股份有限公司(下稱群峪)位於臺中市大 雅區自立段1228地號(西側),台灣百慕達紙器廠(下稱 台灣百慕達)位於同段1229地號(東側),所稱第一面、 第二面、第三面、第四面,如圖1。依臺中市空間地圖查 詢系統(圖2)、地籍圖資網路便民服務系統(圖3~7),1228 地號,由北至南依序編有92號、92-1及92-3等3個門牌號 碼,1229地號則編有92-5、92-6及92-7等3個門牌號碼。 惟因門牌係業主自行掛設,位於1228地號之群峪,實際 門牌為92-6;位於1229地號之台灣百慕達,實際門牌為 92-7。本案考量臺中市政府都市發展局(下稱都發局) 民國(下同)104年8月24日違章建築認定通知書所述自 立段1128地號違章建築(92、92-3、92-6)、1229地號違 章建築(95-5、92-7)與現況較為相符,且該府消防局災 害搶救報告書、火災原因鑑定報告書均以台灣百慕達
2
(92-7)、群峪(92-6)稱之,故以下仍稱台灣百慕達為92-7 號,群峪為92-6號,合先敘明。 全案經本院108年10月29日履勘火場、聽取臺中市政 府簡報,調取該府、臺中地方檢察署、消防署等有關卷 證,並於109年5月21日詢問內政部消防署及臺中市政府 都發局、消防局等相關人員調查發現,本案農地違章工 廠處理及火災搶救過程,確有違失,應予糾正促其注意 改善。茲臚列事實與理由如下: 一、本案火災現場為農地違章工廠,違反土地分區使用規 定,且經臺中市政府都發局104年8月認定屬新違建, 惟該府迄108年10月3日發生火災,均未依都市計畫法 第79條、建築法第86條規定處罰鍰或命其停止使用或 拆除,顯有違失。 (一)按建築物非經申請直轄市、縣(市)(局)主管建築機 關之審查許可並發給執照,不得擅自建造或使用或 拆除。違反規定者,依下列規定,分別處罰:擅自 建造者,處以建築物造價千分之五十以下罰鍰,並 勒令停工補辦手續;必要時得強制拆除其建築物 (第1款)。擅自使用者,處以建築物造價千分之五 十以下罰鍰,並勒令停止使用補辦手續;其有第五 十八條情事之一者,並得封閉其建築物,限期修改 或強制拆除之(第2款),建築法第25、86條定有明 文。另都市計畫法第79條亦規定:都市計畫範圍內 土地或建築物之使用,或從事建造、採取土石、變 更地形,違反本法或內政部、直轄市、縣(市) (局) 政府依本法所發布之命令者,當地地方政府或鄉、 鎮、縣轄市公所得處其土地或建築物所有權人、使 用人或管理人新臺幣六萬元以上三十萬元以下罰 鍰,並勒令拆除、改建、停止使用或恢復原狀。不 拆除、改建、停止使用或恢復原狀者,得按次處罰,
3
並停止供水、供電、封閉、強制拆除或採取其他恢 復原狀之措施,其費用由土地或建築物所有權人、 使用人或管理人負擔。 (二)查臺中市大雅區中和六路92-6號(群峪)及92-7號 (台灣百慕達),分別座落於自立段1228、1229地 號,係屬都市計畫內農業區。其中,自立段1228地 號上建物門牌地址:中和六路92號(原汎程有限公 司)於103年間經檢舉違規使用,經大雅區公所於 103年10月14日以雅區農字第1030023868號函查復 現場為廠房、未做農業使用,經農業局依農業發展 條例第69條規定,於同年月20日以府授農地字第 1030210373號函通報都市發展局,臺中市政府103 年12月5日府授都測字第1030246718號函並請汎程 公司立即停止違規使用或恢復合法使用,該府都發 局104年1月15日中市都違字第1030215325號「違章 建築認定通知書」並認定自立段1228地號(何世湧) 上面積約2,200 平 方公尺之建築 方公尺之建築( 含本案群峪公 司),屬「100年4月20日以前興建完成之既存違章 建築」在案,如圖8。 (三)次查前述汎程公司,除103年間經檢舉違規使用外, 亦屬內政部營建署104年6月1日函請臺中市政府清 查之未登記工廠,該府都發局修復科依大雅區公所 104年8月3日 1查報單,於104年8月14日赴現場勘 查,因現場自立段1228、1229地號涉違章建築,經 都發局依104年空間地圖點位判定,中和六路92、 92-3、92-6號(自立段1228地號)、中和六路92-5、 92-7號(自立段1229地號)均為新違建,如圖9、10, 此有都發局104 年8 月24 日中市都違字第
1 雅區公建字第1040019463號函
4
在案可稽。 (四)本案台灣百慕達、群峪於都市計畫農地區作「其他 家庭器具及用品批發業」使用,前經都發局104年8 月24日認定屬「100年4月20日之後興建完成之新違 建」,主管機關除得依都市計畫法第79條規定,處 其土地或建築物所有權人、使用人或管理人新臺幣 (下同)六萬元以上三十萬元以下罰鍰,並勒令拆 除、改建、停止使用或恢復原狀外。亦得依建築法 第86條規定處以建築物造價千分之五十以下罰 鍰,或依104年8月24日違章建築通知書所載:「上 列違章建築經勘察,實質違建部分依法不得補辦建 造執照手續,依建築法第25、86條及違章建築處理 辦法第5條規定,應予拆除。」拆除之,然迄108年 10月3日發生火災,臺中市政府毫無作為,任令大 型違建屹立於都市計畫農業區,斲傷公權力。 (五)綜上,本案火災現場為農地違章工廠,違反土地分 區使用規定,且經臺中市政府都發局104 年8 月認 定屬新違建,惟該府迄108 年10 月3 日發生火災, 均未依都市計畫法第79 條、建築法第86 條規定處 罰鍰或命其停止使用或拆除,顯有違失。 二、群峪(92-6號)與百慕達(92-7號)為同一時間興建之鐵 皮違章工廠,二者雖間隔8米車道,然車道上方有人 字樑型,結構相通,就消防搶救而言,屬同一棟鐵皮 建築;依92-6號1樓「倉儲區」監視器錄影畫面,該 區自凌晨01:45起煙熱即自東南角落大量進入,02: 00時已煙熱瀰漫全區,內部完全無法辨識,惟西屯周 小隊長(03)於92-6號內部無人受困情況下,仍命2隊 員入室執行煙熱監測,致逃生不及殉職,事後,臺中 市政府消防局「災害搶救報告書」、及109年5月21日
5
應本院詢問所辯「西屯(03)命2員殉職消防員入室 前,曾於02:32先與廠商人員進入至92-6號倉儲區樓 梯口,當時『內部無煙熱蓄積,視線良好』」云云, 核與監視錄影畫面、火場全面燃燒等不符,要非可採。 (一)查臺中市大雅區中和六路92-7號(台灣百慕達)、 92-6號(群峪)均為地上2層之農地違章鐵皮建築, 分別作為生產紙盒、紙杯及儲存南北雜貨、免洗餐 具、紙杯、紙盒之用,並在上開兩廠房中間之8公 尺防火通道上方,加蓋人字樑鋼架烤漆浪板 ,當作 避雨用,在消防上,屬同一棟建築,如圖11。本次 火災,起火點在台灣百慕達(92-7號),民眾於108 年10月3日凌晨1時45分許報案,案經指揮中心派遣 火警大雅分隊、西屯特搜分隊……等進行92-7號搶 救及92-6號周界防護,惟2時26分無線電回報現 92-7號建築物已全面燃燒,2時57分許延燒至92-6 號(群峪公司),造成西屯特搜分隊謝志雄、張哲嘉 2名消防員殉職。災後,該局火災搶救報告書參之 一、火災動態資料及指揮概況表記載:02時32分~02 時34分「動態資料、指揮官處置」,略以:「1.任務 指揮官西屯03先行會同員工進入92-6 號建築物 內,內部無煙熱蓄積,視線良好。2.任務指揮官西 屯03另率2員執行92-6號建築物監測煙熱警戒任 務。」另臺中市政府109年2月24日府授消救字第 1090040374號復函亦稱,02時30分~02時34分救火 指揮官黃耀星(104)指派西屯特搜分隊周正斌小隊 長(西屯03)執行煙熱監測警戒任務,西屯03先行會 同員工進入92-6號建築物,內部無煙熱蓄積,視線 良好,而另指派2員執行92-6號建築物監測煙熱警 戒任務。嗣臺中市政府復本院109年5月21日詢問問 題,進一步更稱「周小隊長是第一時間02:32跟藍
6
副理入室查看時,有到一樓通往二樓樓梯處。02: 41帶兩位同仁入室時,到第2個轉角處(辦公室第2 個門)前並向兩員指向前方5公尺右側有通往2樓樓 梯,待兩員瞭解後往前走,周小隊長(西屯03)退 出)。」 2等語。 (二)有關西屯特搜分隊周小隊長派員入室偵測煙熱之經 過,訊據周正斌108年10月3日筆錄,略以:「快到3 日凌晨2點時,……我們報出勤,2點10幾分到達現 場,……黃耀星組長就叫我跟謝志雄、張哲嘉去右 邊的工廠(還沒有燒的工廠),看煙、熱有無蓄積, 謝志雄、張哲嘉先去著裝,我先去看現場的路徑, 工廠外當時有人,我請他們幫忙指一下要進去的 路,當時我從外面看進去,還有10幾公尺的能見 度,謝志雄、張哲嘉著裝完,我就拿熱顯像儀,帶 到工廠的前門左右,檢查謝志雄、張哲嘉的服裝有 無符合規格,他們服裝有符合規格,我就帶謝志 雄、張哲嘉到工廠辦公室內右邊第二個門,叫他們 去偵測煙、熱,有什麼狀況要回報,後來我就退到 外面去,我就去注意水線,二樓的屋頂。」 3等語, 周小隊長當時是請工廠外之人幫忙指一下要進去 的路,從外面看,還有10幾公尺的能見度。惟這般 說法,與其同年月25日訊問筆錄:「我要執行任務 之前,在92-6號場入口前方有二名員工,其中一名 是男性,我請該男員工帶我進到92-6號廠。」 4、「我 叫他帶我最遠到要上二樓的樓梯口處。」 5、「是無
2 臺中市政府應本院詢問之書面說明資料第10頁。 3 問:能否請您講經過情形? 4 問:108年10月3日你請西屯特搜分隊隊員張哲嘉、謝志雄持TIC至92-6號廠房做煙熱偵測之 前,有無先了解92-6號廠房內的內部隔局、物品的擺設狀況? 5 問:你跟該男員工進入92-6號廠的情形?
7
煙、無熱、能見度清晰。」 6等語,已完全不同。要 言之,訊據108年10月3日筆錄,周小隊長並未與群 峪員工入室勘查,同年月25日則改稱與廠商員工至 1樓樓梯口入室勘查,92-6號1樓物品配置圖,如圖 12。 (三)惟查臺中市政府消防局火災原因調查鑑定書,群峪 公司1樓內部之倉儲區設有編號4、7、8、9、10等 監視器,火災時持續錄影至02:21許止。依臺中市 消防局提供之監視錄影畫面,本院摘錄00:00(火 災前)、01:45(民眾通報火警時)之監視畫面如圖 13,摘錄02:00、02:20時點之監視畫面如圖14~15, 92-6號、92-7號2F平 面配置與 面配置與CH-1(新1)監視器相 對位置圖,如圖16,92-6號2樓後方鐵板走道監視 走道監視 畫面如圖17。依據上開監視錄影畫面,清楚可見1 樓倉儲區之煙主要從92-6號東南角大量進入,01: 45時內部陳設尚清晰可見,短短15分鐘,02:00時 所有監視器畫面已完全看不到內部擺設,2樓則於 01:45時已完全看不到內部陳設。佐以無線電譯 文、災害搶救報告書亦記載01:59「濃煙竄出,火 煙非常」、01:16「現在火勢沒有控制」、02:26「92-7 號建築物已全面燃燒」、02:42「裡面都已經全面 燃燒」等,周小隊長於內部無人受困情況下,仍派 謝、張二員入室監測煙熱,事後,於108年10月3日 訊問筆錄所稱「當時從外面看,還有10幾公尺的能 見度」、周小隊長108年10月25日訊問筆錄所稱「我 叫他帶我最遠到要上二樓的樓梯口處。」 7、「是無 煙、無熱、能見度清晰。」 8,以及災害搶救報告書
6 問:從入口直至二樓樓梯口的情形? 7 問:你跟該男員工進入92-6號廠的情形? 8 問:從入口直至二樓樓梯口的情形?
8
載述「02:32~02:34時內部無煙熱蓄積,視線良 好」、該府109年2月24日府授消救字第1090040374 號函稱「任務指揮官西屯03先行會同員工進入92-6 號建築物,內部無煙熱蓄積,視線良好。」、臺中 市政府109年5月21日復本院詢問所稱:「周小隊長 是第一時間02:32跟藍副理入室查看時,有到一樓 通往二樓樓梯處。」云云,均非可採。 (四)綜上,群峪(92-6號)與百慕達(92-7號)為同一時間 興建之鐵皮違章工廠,二者雖間隔8米車道,然車 道上方有人字樑型,結構相通,就消防搶救而言, 屬同一棟鐵皮建築;依92-6號1樓「倉儲區」監視 器錄影畫面,該區自凌晨01:45起煙熱即自東南角 落大量進入,02:00時已煙熱瀰漫全區,內部完全 無法辨識,惟西屯周小隊長(03)於92-6號內部無人 受困情況下,仍命2隊員入室執行煙熱監測,致逃 生不及殉職,事後,臺中市政府消防局「災害搶救 報告書」、及109年5月21日應本院詢問所辯「西屯 (03)命2員殉職消防員入室前,曾於02:32先與廠 商人員進入至92-6號倉儲區樓梯口,當時『內部無 煙熱蓄積,視線良好』」云云,核與監視錄影畫面、 火場全面燃燒等不符,要非可採。 三、本案救災現場位於第一大隊轄區,依「無線電通訊使 用原則」,現場直通頻道應使用16號,支援分隊亦同, 惟特搜西屯分隊跨區支援救災,周正斌小隊長命隊員 謝志雄、張哲嘉入室監測92-6號之煙、熱狀況(當時 尚未燃燒),卻未將現場直通頻道改為16號,且自隊 員02:41許入室迄其02:57發現火場煙塵下降,期間 約16分鐘均未與入室人員通信構連,瞭解內部煙熱狀 況,顯有違失。
9
(一)查臺中市政府消防局組織編制 9,設九個救災救護大 隊 10,下轄五十二個分隊、一個專責救護隊 11及一個 搜救犬隊 12。所稱九個救災救護大隊,實際為八個 救災救護大隊加一個特搜大隊,其中,特搜大隊下 設大誠分隊、西屯分隊、國光分隊、搜救犬隊,本 案特搜西屯分隊,依分隊分布圖,與第六救災救護 大隊之黎明、協和分隊,均位於西屯區。各大隊所 轄分隊如下: 1、第一救災救護大隊(下設:豐原分隊、潭子分隊、 大雅分隊、神岡分隊、頭家厝分隊、豐南分隊)。 2、第二救災救護大隊(下設:東勢分隊、新社分隊、 和平分隊、石岡分隊、梨山分隊、雙崎分隊、谷 分隊、石岡分隊、梨山分隊、雙崎分隊、谷 關分隊)。 3、第三救災救護大隊(下設:烏日分隊、太平分隊、 分隊、 霧峰分隊、中山分隊、仁化分隊、大里分隊、十 九甲分隊、溪湳分隊、車籠埔分隊)。 4、第四救災救護大隊(下設:梧棲分隊、犁份分隊、 龍井分隊、沙鹿分隊、清水分隊、大肚分隊、清 泉分隊)。 5、第五救災救護大隊(下設:幼獅分隊、大安分隊、 獅分隊、大安分隊、 后里分隊、大甲分隊、外埔分隊)。 6、第六救災救護大隊(下設:南屯分隊、協和分隊、 黎明分隊、春社分隊、工業區分隊)。 7、第七救災救護大隊(下設:中港分隊、信義分隊、
9 摘錄自臺中市政府消防局網頁, https://www.fire.taichung.gov.tw/content/index.asp?Parser=1,3,19。 10 該網站雖列九個救災救護大隊,惟查應為八個救災救護大隊與一個特搜大隊。依臺中市政 府消防局組織規程第5條:本局負責執行重大災害人命救助設特搜大隊。同規程第6條:本局 依轄區特性及業務需要設救災救護大隊。因特搜大隊與救災救護大隊任務,尚屬有間。爰此, 建議仍應依組織規程修正網頁資訊,以資區分。 11 專責救護隊,隸屬第七救災救護大隊。 12 搜救犬隊,隸屬特搜大隊。
10
中區分隊、勤工分隊、東英分隊、專責救護隊)。 8、第八救災救護大隊(下設:北屯分隊、文昌分隊、 水湳分隊、四平分隊 分隊、東山分隊)。 9、特搜大隊(下設:大誠分隊、西屯分隊、國光分 隊、搜救犬隊)。 (二)次查「臺中市政府消防局無線電通訊使用原則」,依 救災、救護別,分別規定各救災救護大隊及特搜大 隊之無線電通訊使用原則。其中,救災部分,規定 第一、二、四和五救災救護大隊執行救災勤務時, 指揮官與中心通聯,原則上仍以7號頻道為主,但 若遇干擾或通訊不良區域,可改轉……,現場直通 頻道:以16號頻道為主;第三、六、七和八救災救 護大隊執行救災勤務時,指揮官與中心通聯,原則 上仍是以1號頻道為主,但若遇干擾或通訊不良區 域,可改轉……,現場直通頻道:仍以3號頻道為 主。至特搜大隊,可能橫跨全局各個大隊,故使用 原則應依上述各救災救護大隊規定,自行切換適用 頻道。另,臺中市政府消防局設有「網路通報系 統」,103年12月1日、104年8月12日網路通報內容, 略以: 1、103年12月1日網路通報(案號A25127) 13,規定救 災無線電頻道使用原則如下: (1)第一~五救災救護大隊:救災頻道(7號),執行 救災勤務時,指揮官與中心通聯,原則上仍以7 號頻道為主,……;現場直通頻道:仍以16號 頻道為主。 (2)第六~八救災救護大隊:救災頻道(1號):執行 救災勤務時,指揮官與中心通聯,原則上仍以1
13 案號A25127。103年12月1日下午04:13:00。通報標題:無線電使用規定。
11
號頻道為主,……;現場直通頻道:仍以3號 頻道為主。 (3)特搜大隊:救災勤務可能橫跨全局各個大隊, 故使用原則應依上述規定,自行切換適用頻 道。 2、104年8月12日網路通報(案號A30703) 14,標題: 「有關與本中心無線電通聯品質改善,再次重申 103年12月1日A25127通報已有規定,本中心再次 重申詳內文」,通報內文略以:(僅摘錄救災部 分,救護略) (1)第一~五救災救護大隊執行救災任務,原則以7 號頻道為主,若遇通訊不良區域,可再改轉其 他頻道與本中心通聯……。 (2)第六~八救災救護大隊執行救災及救護任務, 維持原使用方式,分別使用1號及6號頻道。 (3)特搜大隊則依其所處執勤區參照上述大隊分 隊使用選擇最適頻道。 (4)災害現場當區無線電通聯,請另使用直通頻 道,切勿使用上述頻道。 大雅分隊、特搜西屯分隊原使用頻道,及特搜 西屯跨區支援大雅分隊應使用頻道、實際使用頻 道,如表3。 (三)惟查本案火災現場位於大雅區中和六路,屬第一大 隊大雅分隊轄區,依上開無線電通訊使用原則及 A25127網路通報等規定,其指揮頻道(或稱中繼頻 道)應使用7號頻道,直通頻道應使用16號;而特搜 大隊西屯分隊,與第六救災救護大隊黎明、協和分 隊均位於西屯區,108年10月3日跨區支援第一大隊
14 案號A30703,104年8月12日下午04:40:00。通報標題:有關與本中心無線電通聯品質改善, 103年12月1日A25127通報已有規定,本中心再次重申詳內文,請查照。
12
轄區救災,其指揮頻道,應由1切至7,現場直通頻 道,亦應由3號頻道切到16號頻道,此有當日跨區 支援救災之西屯分隊長陳杰祺小隊長108年10月7 日訊問筆錄:「(問:本案指揮官有統一律定頻道 嗎?)中縣我們有律定16,中市他們應該是3,基本 上我們一定是用16,除非現場指揮官有說要改3 號。」在卷可稽。108年10月3日凌晨2時32分許, 指揮官黃耀星 15為恐火勢延燒至92-6號(群峪),命 特搜西屯分隊周正斌小隊長監測92-6號之煙、熱狀 況,周小隊長員2時41分許與隊員謝志雄、張哲嘉 入室後退出,訊據周小隊長108年10月25日筆錄:「3 號」(問:你屬於西屯特搜分隊,你用的救災頻 道?)、「3號」(問:張哲嘉、謝志雄用的救災頻 道?),周小隊長與謝、張2人當時均使用3號頻道, 而未將現場直通頻道改為16號。本院鑑於周小隊長 於救災日2時57分使用指揮頻道 16呼叫「ㄟ志雄快! 趕快出來」,於109年5月21日詢問周小隊長當時帶 多少支無線電出勤,案經周小隊長表示當時帶2支 無線電在卷可稽。倘其當時確攜兩支無線電,則其 與入室隊員之無線電通信測試,更應謹慎,其 ,更應謹慎,其108 年10月7日接受檢察官訊問所稱「我退出來後,我 有按一次,直接按測試,就『咚』,我有收到訊號, ,就『咚』,我有收到訊號, 這就是測試。」 。」 17云云,按該「咚」非無線電通話 測試,況其攜帶兩支無線電,一支在指揮頻道 ,況其攜帶兩支無線電,一支在指揮頻道7(與 轄區第一大隊同),另一支在直通頻道3(與第一大 隊不同),究該「咚」來自哪一支無線電,在當下
15 指揮官黃耀星109年5月25日向本院表示當日並未說要改3號。 16 依臺中市政府消防局109年5月21日接受本院詢問提出之說明資料,周小隊長使用7號指揮頻 道。 17 問:幫他們檢查無線電設備時,有無檢查無線電條到同一個頻道?
13
火場環境下,除不易辨別外,當時使用頻道3者, 非僅謝、張2人,周小隊長未依規定與入室2人通信 測試,即有疏漏。再者,周小隊長自隊員 ,即有疏漏。再者,周小隊長自隊員2時41分 許入室迄其2時57分許發現煙塵下降,期間約16分 鐘,周小隊長均未與其通信構連,瞭解內部煙熱狀 況,並報告指揮官,顯屬違常,待其發現煙塵下降, 雖呼叫已來不及。 (四)綜上,本案救災現場位於第一大隊轄區,依「無線 電通訊使用原則」,現場直通頻道應使用16號,支 援分隊亦同,惟特搜西屯分隊跨區支援救災,周正 斌小隊長命隊員謝志雄、張哲嘉入室監測92-6號之 煙、熱狀況(當時尚未燃燒),卻未將現場直通頻道 改為16號,且自隊員02:41許入室迄其02:57發現 火場煙塵下降,期間約16分鐘均未與入室人員通信 構連,瞭解內部煙熱狀況,顯有違失。 四、本案92-6號與92-7號為同一棟鐵皮建築物,與內政部 消防署消防人員救災安全手冊」第19-2章所述:「火 煙易從屋頂端及牆面鐵皮重疊處的縫隙流竄,且受輻 射熱影響引燃鄰近場所牆面周邊物品,而使火勢極易 造成延燒」同,其煙熱自1時45分許(火災初期)即 已陸續流入92-6號,並蓄積室內,惟特搜西屯分隊周 小隊長無視92-7號於2時26分已全面燃燒,仍於2時41 分許派員進入92-6號執行煙熱監測任務,且未安排水 線伴行,顯有違失。 (一)查內政部消防署考量近年來因搶救鐵皮屋火災已造 成許多消防人員殉職與受傷,原因有屋頂作業踩空 或滑倒而跌落、夾層地板燒穿踩空墜落、夾層坍塌 燒穿踩空墜落、夾層坍塌 或遭遇閃燃危害等……,為防範遺憾事故未來再次 發生,故編訂「消防人員救災安全手冊」。其中第 19-2章「搶救鐵皮屋建築物火災安全指導原則」,
14
敘述鐵皮屋災害特性如下: 1、建築物結構無法阻擋火勢延燒。鐵皮屋各戶間之 牆壁為金屬材質,在屋頂端會有些微縫隙,且牆 面鐵皮重疊處受熱後就會變形而產生縫隙,以及 夾層與樓層地板 大多使用木板材質,有燒穿及不 材質,有燒穿及不 穩固的情形,再加上樓梯與貨梯無防火材質的牆 面區隔等無防火區劃之情形,均是煙蔓延的流通 途徑,而無法有效阻擋火勢延燒。 2、建築物棟距小,易受輻射熱與風向影響而加速延 燒。業者為讓鐵皮屋內部有更大使用空間,故在 搭建時未在四周保留空地,與鄰棟鐵皮屋建築緊 鄰搭建,導致火災發生時,鐵皮屋建築物間的棟 距不足以阻擋輻射熱,而加速火勢延燒速度,並 使消防人員難以阻隔延燒。 3、火載量大。倉庫與工廠為鐵皮屋的主要用途,場 所內存放許多物品、貨物、生產原料與成品,起 火燃燒時就有大量可燃物助長火勢。 4、內部空間可蓄積大量高溫濃煙。鐵皮屋均為樓層 挑高建築,發生火災時,起火場所內部可蓄積大 量濃煙,同時也會快速從鐵皮縫隙往鄰近場所流 竄,夜間或假日發生火災,大多無法在火災初期 即時發現,消防人員抵達後火勢可能已達閃燃或 爆燃的條件。 5、火勢快速延燒。鐵皮屋各戶間之牆壁與內部隔間 大多無防火時效,而且與鄰棟鐵皮屋無適當間 距,兩棟鐵皮屋間之通行道路大多不寬,火煙易 從屋頂端及牆面鐵皮重疊處的縫隙流竄,且受輻 射熱影響引燃鄰近場所牆面周邊物品,而使火勢 極易造成延燒,再加上風向因素,下風處延燒速 度就更為快速,抵達火災現場應以阻隔延燒為
15
主,且要注意車輛停放位置,避免車輛因輻射熱 而受損。 6、救災人員在場所內部定向及定位困難。鐵皮屋建 築大多做為工廠或倉庫使用,內部除有辦公室 隔間外,其餘面積大多放置機台、貨架與貨物 等,救災人員在場所內部難以定向與定位,需搭 配水線及照明索進行救災,否則易有迷失方向之 情形。 (二)次查消防法於108年11月13修正公布,增訂第27條之 1,規定中央主管機關為調查消防及義勇消防人員 因災害搶救致發生死亡或重傷事故之原因,應聘請 相關機關(構)、團體代表、學者專家及基層消防 團體代表,組成災害事故調查會(下稱調查會)。 本案消防署比照消防法第27條之1規定,成立「臺 中市大雅區中和六路火災事故調查會」,依消防署 接受本院詢問所提供之說明資料,歷次調查會研商 會議均有委員對於本案派員入室監測任務且未有 水線伴行,提出相關質疑,略以: 1、108年11月8日第1次會議:為何沒有火煙熱,還 要派人入室(92-6號延燒戶)?2位殉職同仁入室 後,後來紙捲擴大燃燒,為何不及早撤出2位殉 職同仁?現場安全官及指揮官並未掌握殉職同仁 之位置(李宗吾委員)。 2、109年1月21日第2次會議: (1)陳崇賢委員:周小隊長下令請2位殉職人員監測煙熱,是 監測1樓還是2樓?為何不攜帶水線進入? (2)簡萬瑤委員:廠房縱深有60公尺,水線部署都在前半段, 廠房有2個鐵捲門,第2個鐵捲門幾乎沒有被破壞,也就 是說水線沒有拉到後面去,沒有有效防阻。這時候派人 員進入可能延燒的廠房進行煙熱監測,可能是個危險的
16
情況。 (3)施昭宏委員:你們判斷92-6號應該還沒有延燒,所以入 室人員沒有拉水線進入。只是92-7號往92-6號延燒速度 遠超過你們的想像。 3、109年3月10日第3次會議,會中陳崇賢委員就執 行戰術的有效性,表示:「同仁進入火場需有水 線防護,旨在建立一個相對安全的空間,讓同仁 在該空間內儘速完成任務。因此防護水線應先 行,以侷限火勢的戰術將火、煙阻隔在前方,讓 之後的同仁方便及安全的執行任務。」等語。 (三)惟查鐵皮屋建築物火災之火煙易從屋頂端及牆面 鐵皮重疊處的縫隙流竄,且受輻射熱影響引燃鄰近 場所牆面周邊物品,而使火勢極易造成延燒,內政 部消防署「消防人員救災安全手冊」第19-2章描述 甚詳。本案火災發生之92-7號,與92-6號雖間隔8 米車道,然其結構相連,中間亦有人字型屋頂相 連,仍屬同一棟建築,則92-7號之燃燒產生之火 煙,易從屋頂端及牆面鐵皮重疊處的縫隙流竄,且 受輻射熱影響引燃鄰近場所牆面周邊物品,而使火 勢極易造成延燒,不難想像。本案大雅分隊凌晨1 時53分抵達火場,2時26分已全面燃燒,迄2時42分 仍未控制,此有臺中市政府109年2月24日府授消救 字第1090040374號函在卷可稽。然該府消防局火災 搶救報告書卻稱2時32分許周正斌小隊長會同員工 進入92-6號,內部無煙熱蓄積,視線良好,並於2 時41分指派謝、張2人進入92-6號執行煙熱監測任 務。按指揮官黃耀星108年10月7日警詢筆錄陳稱 18:「……,我同時與蘇泰宗小隊長討論2棟建築物
18 108年10月7日警詢筆錄,問:西屯特搜分隊隊員謝志雄、張哲嘉二位同仁在你到場時,擔 任
17
間的屋頂煙、熱流動情形,我認為有必要在尚未燃 燒的92-6號建物實施警戒、監控,於是我再請周正 斌小隊長擔任任務指揮官,率員實施92-6號建物的 煙、熱監控,以免火勢延燒至該棟。」,以及特搜 西屯分隊小隊長周正斌108年10月3日訊問筆錄 19: 「我們到場後,92-7號已全部燃燒了,輻射熱很 強。且上址是鐵皮屋頂、鐵很容易吸熱。」等語, 指揮官黃組長指派周小隊長監測92-6號煙熱時, 92-7號已全面燃燒,因92-6號與92-7號為同棟鐵皮 屋,煙熱早已進入92-6號並蓄積室內,惟黃指揮官 與周小隊長明知92-7號已全面燃燒,92-6號無人受 困,卻於2時41分在沒有水線伴隨之情況下,派人 入室之決定,顯有可議。 (四)綜上,本案92-6號與92-7號為同一棟鐵皮建築物, 與內政部消防署消防人員救災安全手冊」第19-2章 所述:「火煙易從屋頂端及牆面鐵皮重疊處的縫隙 流竄,且受輻射熱影響引燃鄰近場所牆面周邊物 品,而使火勢極易造成延燒」同,其煙熱自1時45 分許(火災初期)即已陸續流入92-6號,並蓄積室 內,惟特搜西屯分隊周小隊長無視92-7號於2時26 分已全面燃燒,仍於2時41分許派員進入92-6號執 行煙熱監測任務,且未安排水線伴行,顯有違失。 綜上所述,本案火災原發生於百慕達(92-7號),與 被延燒之群峪(92-6號),皆為同一時間興建之農地違章 工廠,違反土地分區使用規定,前經臺中市政府都市發 展局104年8月認定屬新違建,惟該局迄108年10月3日發 生火災,均未依都市計畫法第79條、建築法第86條規定 處罰鍰或命其停止使用或拆除;再者,92-6與92-7號雖
何任務。 19 108年10月3日檢察官訊問筆錄,問:補充?
18
間隔8米車道,然車道上方有人字樑型,結構相通,就消 防搶救而言,屬同一棟鐵皮建築,其煙熱流動,依92-6 號1樓「倉儲區」監視器錄影畫面,該區自凌晨01:45 起煙熱即自東南角落大量進入,02:00時已煙熱瀰漫全 區,內部完全無法辨識,惟特搜西屯周小隊長(03)於92-7 號已全面燃燒、92-6號內部無人受困且無水線伴隨情況 下,仍命2隊員入室執行煙熱監測,致其逃生不及殉職, 事後,臺中市政府消防局「災害搶救報告書」、及109年5 月21日應本院詢問所辯「西屯(03)命2員殉職消防員入室 前,曾於02:32先與廠商人員進入至92-6號倉儲區樓梯 口,當時『內部無煙熱蓄積,視線良好』」云云,核與監 視錄影畫面、火場全面燃燒等不符,要非可採;又,本 案救災現場位於第一大隊轄區,依「無線電通訊使用原 則」,現場直通頻道應使用16號,支援分隊亦同,惟特搜 西屯分隊跨區支援救災,周正斌小隊長命隊員謝志雄、 張哲嘉入室監測92-6號之煙、熱狀況(當時尚未燃燒), 卻未將現場直通頻道改為16號,且自隊員02:41許入室 迄其02:57發現火場煙塵下降,期間約16分鐘均未與入 室人員通信構連,瞭解內部煙熱狀況等情,均有違失, 爰依憲法第97條第1項及監察法第24條之規定提案糾 正,移送行政院轉飭所屬確實檢討改善見復。
FD06178 | 2019_港澳台_澳门_广福祥花园第四座火警_消防局调查结果.md
分类:06_境外及港澳台调查报告 | 年份:2019 | 地域:澳门 | 严重程度: | 场所: | 起火原因:燃气/爆炸 | 来源格式:md
NEWS GOV-MO: 有关广福祥花园火警之调查结果 跳至内容 A A A 简 目录 民防快讯 搜寻 新闻 中央与特区 特区政务 区域合作 对外关系 政府服务 法律司法 廉政审计 经济财政 劳工就业 公共秩序 医疗卫生 民生福利 旅游文化 教育体育 城规基建 工程房屋 交通能源 环境气象 科技通讯 新闻传播 其他 新闻 全部 中央与特区 特区政务 区域合作 对外关系 政府服务 法律司法 廉政审计 经济财政 劳工就业 公共秩序 医疗卫生 民生福利 旅游文化 教育体育 城规基建 工程房屋 交通能源 环境气象 科技通讯 新闻传播 其他 图片 新闻图片 相聚此刻 图片 全部 新闻图片 相聚此刻 视频 图文包 专题新闻 施政报告 施政特写 横琴粤澳深度合作区 「一带一路」 粤港澳大湾区 一中心,一平台 专题新闻 全部 施政报告 施政特写 横琴粤澳深度合作区 「一带一路」 粤港澳大湾区 一中心,一平台 专题特写 GOV.MO 政府入口网站 一户通 部门网站 部门社交媒体目录
- 更多
传媒资料 架构职能 新闻法规 服务承诺 刊物状况 澳门杂志 澳门年鉴 澳门相簿 采购资讯 澳门概况 登记服务 预约服务 开考通告 意见信箱 联络我们 搜寻 新闻显示模式 新闻 中央与特区 特区政务 区域合作 对外关系 政府服务 法律司法 廉政审计 经济财政 劳工就业 公共秩序 医疗卫生 民生福利 旅游文化 教育体育 城规基建 工程房屋 交通能源 环境气象 科技通讯 新闻传播 其他 新闻 全部 中央与特区 特区政务 区域合作 对外关系 政府服务 法律司法 廉政审计 经济财政 劳工就业 公共秩序 医疗卫生 民生福利 旅游文化 教育体育 城规基建 工程房屋 交通能源 环境气象 科技通讯 新闻传播 其他 图片 新闻图片 相聚此刻 图片 全部 新闻图片 相聚此刻 视频 图文包 专题新闻 施政报告 施政特写 横琴粤澳深度合作区 「一带一路」 粤港澳大湾区 一中心,一平台 专题新闻 全部 施政报告 施政特写 横琴粤澳深度合作区 「一带一路」 粤港澳大湾区 一中心,一平台 专题特写 GOV.MO 政府入口网站 一户通 部门网站 部门社交媒体目录
- 更多
传媒资料 架构职能 新闻法规 服务承诺 刊物状况 澳门杂志 澳门年鉴 澳门相簿 采购资讯 澳门概况 登记服务 预约服务 开考通告 意见信箱 联络我们 民防快讯 新闻 新闻 繁 简 有关广福祥花园火警之调查结果 消防局 2019-10-27 16:23 上一则 下一则 在大厦管理公司人员见证下,消防局人员及消防系统保养公司人员共同检查消防水缸水源状况 在大厦管理公司人员见证下,消防局人员及消防系统保养公司人员共同测试梯间消防喉 在大厦管理公司人员见证下,消防局人员及消防系统保养公司人员共同测试消防喉辘 起火楼层之警钟按钮已作更换 部份楼层之警钟及警钟按钮亦已作更换 1 2 3 4 5 未能播放Youtube视频 消防局高度重视有关广福祥花园第四座火警的调查工作,经详细调查与该大厦有关的消防系统、设施及设备等的各种情况后,综合调查结果如下: 消防局分别于今年5月9日、6月21日以及7月5日,因接到阻塞走火通道的投诉,随即派员到肇事大厦进行消防安全巡查,期间除了巡查走火通道的情况外,亦有关注消防系统的情况,发现消防系统保养证明书已过有效使用期,故已即时通知管理公司须要尽快跟进消防系统、设施及设备的维修保养,并透过公函通知职权部门,然而,于火警发生前消防局仍未收到任何有关上述消防系统、设施及设备的维护信息。 于发生火警之翌日早上,鉴于有新闻报导该大厦的管理公司表示该大厦的消防喉出水正常,这与消防局救火当时的客观情况有差异,有见及此,本局即时派出消防人员连同管理公司人员抵达现场验证,共同对大厦内消防系统进行测试,证实消防喉一般出水正常,而火警当日的情况是有水,但压力不足以救火。 随后于本年10月25日,消防局人员再次前往广福祥花园第四座,在大厦管理公司人员的陪同下,与消防系统保养公司人员一同进行全面巡查及检验上述大厦之消防系统、设施及设备,有关情况如下﹕ 在没有开启大厦消防泵情况下,只接驳消防局水泵车,从大厦地面层之消防入水掣供水到大厦楼层的梯间消防喉。当水泵车供水压力增加时(由400Kpa增加至800Kpa压力),大厦6至7楼的梯间消防喉水压并没有上升(消防喉水压静压力为300Kpa),而同时大厦地面层之消防入水掣周边地下不断有水大量涌出。有理由相信上述入水掣之地下喉管损坏,导致水泵车供水无法到达大厦楼宇的梯间消防喉。 大厦每层只设置有一个警报按钮,巡查时发现大厦3楼至8楼的警钟及警报按钮均为新更换的,而14楼的警钟及15楼的警报按钮亦为新更换。测试大厦警报按钮与警钟及消防泵的联动情况,警报按钮能启动警钟及消防泵一切正常,消防喉辘系统亦运作正常。 据消防系统保养公司人员表示,大厦的警报系统为旧式串联设计,各层警报按钮相连,若某楼层的警报按钮损坏,有可能直接影响下方所有楼层的警报按钮及消防泵的联动功能。 测试大厦的正副消防泵、消防水箱上水泵、停车场部份花洒正副泵及花洒消防入水掣,皆运作正常。 大厦大部份楼层公众通道、梯间内摆放大量杂物。同时,大部份楼层应急楼梯隔火室门全部打开,正常应关闭。部份出口标志(灯箱)及应急照明不能正常运作或损坏。消防喉出水口内之胶圈损坏及灭火器已过有效使用期。 于本年10月25日,本局去函大厦管理公司及消防系统保养公司,要求提供相关消防系统的保养记录。其后,收到由大厦管理公司提交,并透过消防局向消防系统保养公司核实,有关消防系统保养公司对广福祥花园第四座消防系统的保养记录(7月、8月,9月及10月共四份)。于7月26日及10月16日的消防系统的保养记录中,提及广福祥花园第四座5楼及15楼警报按钮及14楼的警钟损坏。而8月及9月的消防系统的保养记录中则备注损坏的零件已报价。 经综合比对是次广福祥第四座火警发生期间的客观情况,以及上述有关消防系统7 月及10月的保养记录,以及火警后的10月25日,在该大厦管理公司的见证下,消防局连同消防系统保养公司进行的排查测试结果,证实该大厦之消防入水掣及警报系统确实存在不同程度的故障及损坏,相信是因部份楼层警报按钮(例如15楼)损坏,引致15楼以下楼层的警报按钮失效,无法启动消防泵;而消防入水掣之地下喉管损坏,是导致是次火警中,消防局水泵车加压供水到大厦梯间消防喉时,未能达到有效的供水压力的主因。 以上的消防系统的损坏情况,直接影响消防员的救援速度,延误灭火的黄金时间;而警报系统的失效亦延缓了市民意识火警发生的时间,减慢了疏散逃生速度。此外,为促使尽快修正相关消防系统故障,消防局将同步把是次有关之消防系统巡查检验报告,通知职权部门跟进。 而有关市民对消防救援过程提出的疑虑,消防局已向前线队员作出了详细的了解及调查,具体内容请参阅附件。 消防局藉此呼吁广大市民,应加强对大厦防火及灭火器材、装置、设备、设施及系统之维护及保养,并至少每十二个月进行一次养护,确保具有良好之运作条件。 附件 1) 回应市民对广福祥花园火警救援过程提出的疑问.doc 00:00 −00:00 上一则新闻 卫生局继续支持本澳中医药发展 下一则新闻 “庆祝中华人民共和国成立70周年暨澳门回归20周年:南海明珠--全国中国画、油画作品展”将揭幕 订阅新闻局 Telegram政府新闻频道: https://t.me/macaogcs ,即时接收最新消息。 部门联络 部门新闻 2026-07-31 12:03 消防局2026年1至6月工作数据发布 2026-07-30 15:35 九澳货柜码头联合消防演习 2026-07-24 22:30 《特定业务及活动的规管制度》今举行第三场公众咨询会 2026-07-22 15:57 消防局严格落实夏防工作部署 多措并举筑牢社区消防安全防线 2026-07-22 15:03 澳门城市燃气有限公司减压站天然气泄漏事故联合消防演习 热点新闻 1 2026-07-25 16:53 药监局和市政署呼吁停止食用一批次婴儿配方奶粉 2 2026-07-27 20:43 跨部门持续跟进婴儿配方奶粉验出铅含量超标事件 增检13个奶粉样本暂未见异常 求诊者中没有发现铅中毒 3 2026-07-25 18:43 卫生局就涉铅超标婴儿配方奶粉事件设绿色通道 为曾食用涉事批次婴幼儿提供医学检查及健康咨询 4 2026-07-26 13:02 跨部门跟进大阪飞澳门航班乘客滞留广西南宁事件 5 2026-07-30 18:39 婴儿配方奶粉监管措施对接国际标准 跨部门全力保障婴幼儿健康及食品安全 6 2026-07-27 10:52 本澳法定产假日数明起调升至90日 7 2026-07-25 20:30 恶劣天气下「银河娱乐集团世界女排联赛澳门2026 – 总决赛」的赛事安排 8 2026-07-25 11:00 受热带气旋影响可能发布之警告(更新时间:2026-07-25 11:00) 9 2026-07-26 00:03 「银河娱乐集团世界女排联赛澳门2026 - 总决赛」土耳其巴西争夺冠军 10 2026-07-26 08:00 受台风红霞影响可能发布之警告(更新时间:2026-07-26 08:00) 订阅频道 Facebook Youtube WeChat Telegram Weibo 澳门特别行政区政府新闻局 Facebook 澳门特别行政区政府新闻局 Facebook 澳门特别行政区政府新闻局 官方微信 澳门特别行政区政府新闻局 官方微信 澳门政府资讯 澳门特区发布 澳门特别行政区政府新闻局 政府新闻频道 澳门特别行政区政府新闻局 政府新闻频道 t.me/macaogcs t.me/NCVMacao 抖音 今日头条 Instagram 电子报 RSS 已复制连结 澳门南湾大马路762-804号中华广场15楼 info@gcs.gov.mo (853)2833 2886 (853)2835 5426 GOV.MO 澳门杂志 澳门年鉴 澳门相簿 意见信箱 联络我们 私隐声明 使用条款 下载手机应用程序 澳门政府新闻 APP - App Store 下载 澳门政府新闻 APP - Google Play 下载 澳门政府新闻 APP - APK 下载
FD06179 | 2019_港澳台_澳门_廉政公署_青洲坊大厦防火卷闸调查报告.md
分类:06_境外及港澳台调查报告 | 年份:2019 | 地域:澳门 | 严重程度: | 场所: | 起火原因:焊接/动火 | 来源格式:md
澳門廉政公署:關於青洲坊大廈防火捲閘的調查報告
選單
主頁
公共服務
行政及法律事務
公共安全及出入境
創業及營商
城市環境
公證及登記
稅務
旅遊及博彩
住房
公共交通
就業
社會保障
醫療衛生
教育
文化
體育
關於政府 行政長官、主要官員、立法和司法機關
公共部門及其他機構
澳門特別行政區公共行政
政府架構
政策諮詢
施政報告
特別推介
澳門資訊 天氣
交通
公眾假期
文娛康體
城市資訊
澳門便覽
統計數字
公佈告示 新聞
短片
特區公報
政府投標
政府招聘
法律法規 憲制性文件
搜法易
澳門主要法例
國際公約
來澳旅遊 計劃行程
觀光
娛樂消閒
購物
節日盛事
商務及貿易 貿易投資
澳門經貿會展
中小企商機和服務
市場資訊
知識產權
相關連結 手機應用程式目錄
社交媒體目錄
專題網站目錄
RSS訂閱目錄
表格下載
澳門特別行政區政府入口網站
新聞
廉政公署公佈《關於青洲坊大廈防火捲閘的調查報告》
廉政公署公佈《關於青洲坊大廈防火捲閘的調查報告》
來源: 廉政公署(CCAC) 由: 新聞局(GCS) 發布日期: 2021年3月19日 10:40
廉政公署公佈《關於青洲坊大廈防火捲閘的調查報告》,未發現有證據顯示任何部門或機關,在更換青洲坊大廈防火捲閘的後加工程中存在不法行為,亦未發現工程判給在程序上違反合法性原則,且造價亦符合當時市場價格,未見明顯行政違法或行政不當狀況。但廉署質疑更換防火捲閘的必要性,認為未見相關部門或機關致力循其他途徑尋求解決辦法,最終浪費總值澳門幣四百多萬元剛完成安裝的防火捲閘。廉署又批評,事件突顯公共部門之間的協調與合作問題,當中房屋局沒有嚴格履行《經屋法》所賦予的統籌協調的角色;工務局、消防局從頭至尾沒有將彼等對防火捲閘的耐火級別標準,與建設辦或房屋局溝通;工務局、消防局亦沒有向建設辦指出可以替代方案滿足有關防火安全的法律要求,使青洲坊大廈建築工程彷彿在散沙一盤的狀態下,經歷了審批、施工、補救的各個階段。相關部門或機關對自身權限的法律認知不足,以及部門之間各自為政,缺乏溝通而導致信息孤島的情況,值得有關部門及整個特區政府重視。
2018年底至2019年初,屬經濟房屋的青洲坊大廈,因地庫停車場及裙樓部份防火捲閘不符合要求未能通過驗收。經跨部門會議後,最後決定更換100道防火捲閘,工程金額澳門幣一千二百餘萬元。由於事件引起社會普遍關注,質疑當中涉及不法行為,廉署十分關切。且陸續收到市民及不同團體的投訴及反映,故先後開立專案及全面調查卷宗,對事件展開深入調查。期間,向房屋局、土地工務運輸局、建設發展辦、消防局及私人實體索取大量文件資料,並聽取有關領導主管及工作人員陳述,審查及研判事件中是否存在不法行為、行政違法或行政失當。
廉署指出, 根據《防火安全規章》的規定,樓宇建築工程所使用的防火捲閘應同時具備隔火性及隔熱性。但在青洲坊大廈建築工程計劃的審批階段,以及在有關防火捲閘的材料報批表等文件中,未能看見建設辦或消防局對擬使用的防火捲閘提出任何反對意見。在興建過程中,消防局亦從未在所製作的消防意見書中明確就隔熱性能的問題作任何表態。消防局及工務局是在已獲批准使用的防火捲閘全部完成安裝工序,工程已宣告竣工的階段才提出有關問題。
廉署調查發現,工務局及消防局至少在2017年2月已達成共識,防火捲閘的隔熱性要求可透過替代方案滿足,只要在人員逃生及阻止火勢蔓延的條件不低於原來要求即可。但兩局在提出青洲坊大廈防火捲閘的問題後,除要求建設辦換閘外,並沒有給予其他解決方案。廉署認為,建設辦為了使青洲坊大廈的建築工程符合《防火安全規章》的規定而更換防火捲閘,這決定符合合法性原則。但工務局及消防局在實務上容許業界採取替代方案,卻硬性要求建設辦換閘,此決定的合理性無可避免地令人存疑。
至於將更換防火捲閘的工程直接判給原承建商,廉署認為因青洲坊大廈竣工後未能整體驗收,將防火捲閘更換工程視作建築工程的補充或後加工程,並無不妥。且原承建商未完全離場,在掌握該大廈建築圖則及原有防火捲閘的安裝上具有優勢,可使問題更迅速地妥善處理。另外,廉署自行作出市場調查,澳門市面上兼具隔火及隔熱性的雙軌及單軌式電動防火捲閘,每平方米價格為澳門幣5,000元至8,000元不等。對比承建商所報價格,未發現存在明顯偏離市場價格的情況。廉署未發現建設辦在此後加工程的判給程序上存在違法事宜,亦未見存在其他行政違法或失當之處。
但廉署認為,房屋局與建設辦不清楚各自在經屋建造事宜上的職能。《經屋法》賦予房屋局具有整體監督和統籌建造經屋的職權,從以往一個用家或用家代表的身份,轉變成一個推動經屋建造者的身份。但在青洲坊大廈整個興建過程中,無論是房屋局或負責監察具體工程執行工作的建設辦,都沒有主動作出相互配合的行為或措施。兩局人員僅將房屋局當作用家般對待,實質上由建設辦全權包辦工程監察、監督與統籌協調的工作。
廉署調查發現,在2017年4月之前,本澳所有建築物的防火閘或防火門物料,都只保障具隔火性,隔熱性無被強制要求。這是因為消防局考慮到熱能透過閘門而引發起火的機率很低,且工務局亦比較過香港、英國和葡萄牙的法規,一般容許只具隔火而不具隔熱性的防火閘或防火門,但不妨礙本澳可採用較嚴格的標準。2016年年底,工務局城市建設廳一改過往驗收條件,要求某私人工程所有人提交防火捲閘具備隔熱性的證明,否則驗收不獲通過。後與消防局代表於2017年2月會議商討後達成共識,可透過指引讓業界提出替代方案,在確保人員逃生及防止火勢蔓延的條件不低於原來要求下,通過驗收。但城市建設廳遲遲沒作出具體指引,以落實有關共識,甚至沒有通知同屬工務局的公共建築廳,統一全局做法,致使部分公共工程未有同步落實防火捲閘的耐火等級標準。此外,工務局也從未通知建設辦等外部部門,最終導致青洲坊大廈防火捲閘問題的出現。
廉署又指出,根據法律,在經屋興建過程中,必須取得消防局的意見或監察報告,包括當中的防火捲閘的耐火檢測。但消防局一直認為所作意見書不具約束力,有關落實執行防火捲閘耐火等級規定,應屬工務局的權限,消防局只是配合執行,故從來不會在意見書或監察報告中明確表達意見。在2018年4月,消防局在回覆建設辦關於青洲坊大廈防火捲閘物料耐火檢測報告的意見書,以及10月在查驗該大廈群樓社會設施所作的監察報告中,對物料耐火等級的意見,只分別寫上:“應諮詢工務局意見”及“須聽取權限部門意見”。廉署經調查確認,工務局人員按其慣常理解,視之為“有關防火捲閘不具隔熱性能”,並於2018年11月7日與消防局、房屋局及建設辦代表進行的會議上,指大廈防火捲閘因不具隔熱性而無法通過驗收,要求建設辦更換所有防火捲閘。但差不多同期開展驗樓程序的另一個經屋項目快盈大廈,雖然同樣使用了不兼具隔熱性能的防火捲閘,消防局卻以沒有收到建設辦附寄的防火捲閘耐火檢測資料為由,按照慣常做法不作審查,亦無在監察報告中寫上“須聽取權限部門意見"的表述。工務局城市建設廳即理解到,消防局無意在快盈大廈的驗樓程序中就防火捲閘的隔熱性能提出質疑,並隨即向該經屋發出使用准照。
廉署認為,對《防火安全規章》的條文理解,尤其是有關防火捲閘是否存有與法例不符的問題,消防局理所當然地具有權威性。雖然現行法例未明文規定消防局所給予的意見具法定約束力,但按該規章第7條第7款規定,對於工務局發出准照決定所依據的消防安全意見,可根據一般法律規定提起訴願,可見並非完全沒有任何約束力或對外效力。此外,《防火安全規章》實際上並無強制要求停車場必須劃分隔火間隔及安裝防火捲閘,全靠相關工務及消防部門之間的共識作出更嚴謹的要求。既然權限部門決意以更嚴格標準保障市民的人身及財產安全,就有關問題達成的共識,應與各相關部門全面溝通、信息共享,以避免部門之間因缺乏溝通造成信息孤島的情況,也不會導致青洲坊建築工程到最後驗樓收則階段,才被提出防火捲閘抗火效能問題的情況。
在報告最後部分,廉署對特區政府早將《樓宇及場地防火安全的法律制度》列入二○二○年財政年度的法律提案項目感到欣慰,當中包括重新劃定工務局及消防局的權限範圍,賦予消防局在防火安全方面的監管權和處罰權等。此外,廉署建議各部門至少是主管級人員,重視對自身部門或機關法律規範的認識,甚至可考慮進行內部普法培訓工作。另外,為貫徹《防火安全規章》保障市民人身與財產安全的原則與精神,消防局應認清自身的專業權威,嚴格把關,全面審查建築工程中的消防安全事宜,以清晰準確的表述向相關部門提供消防安全的意見。而工務局應將工程建造的執法準則或改變處理方式的信息,及時通知業界或各相關部門,提升執法的透明度及確保執法的一致性。至於防火捲閘耐火等級的處理方法,工務局及消防局在達成共識後應對內對外予以公開,加強對各轄下附屬單位的聯繫,定期與業界及其他參與工程建造的部門或機關進行信息互動。最後,廉署期望特區政府透過本案所反映的現象從中汲取經驗,以新法的審議作為契機,重新正視及培養各部門的協調合作。各部門積極溝通聯繫,不再囿於自身權限及工作事務範圍,應具備無私的態度及有全局通盤考慮的意識,共同妥善處理公共事務,切實維護公共利益。
報告已呈交行政長官參閱。報告全文可於廉政公署網頁下載。
列印本頁
NEWS-1-4-369600
最新新聞
行政長官岑浩輝赴福建出席閩澳合作會議 2026年8月1日 16:00
衛生局接獲1宗腸病毒群集性感染報告 2026年8月1日 15:00
澳大新設五學院兩研究院今正式運行 2026年8月1日 11:39
澳門保安部隊事務局開通微信影音號 2026年8月1日 00:00
第九屆儲能與智能運載國際會議於澳大舉行 2026年7月31日 21:51
藥物監督管理局呼籲勿使用一款摻雜西藥成分的外用產品 2026年7月31日 20:41
運輸工務司司長譚偉文列席立法會全體會議,回應議員提出的口頭質詢。 2026年7月31日 20:40
針線連匠心 菁英聚橫琴 ——第48屆世界技能大賽時裝技術 橫琴國際邀請賽圓滿落幕 2026年7月31日 18:26
通勤無憂!琴澳跨境學生專車新學年申請8月3日開放! 2026年7月31日 18:17
吳惠嫻任橫琴粵澳深度合作區執委會主任 2026年7月31日 17:56
查看全部
FD06180 | 2020_台湾_台中大雅农地违章工厂火灾_监察院纠正案文.pdf
分类:06_境外及港澳台调查报告 | 年份:2020 | 地域:台湾 | 严重程度: | 场所:厂房/车间 | 起火原因: | 来源格式:pdf
1 糾 正 案 文 壹、被糾正機關:臺中市政府。 貳、案 由:臺中市大雅區中和六路92-7號農地違章工 廠,於108年10月3日發生火災,並延燒至 同為鐵皮建築,與火場間隔8米車道,上方 設有人字型屋頂之92-6號,經查臺中市政 府於104年8月即認定屬新違建,迄發生火 災,均未依規定處罰鍰或命其停止使用或 拆除;另火災搶救,未諳消防人員救災安 全手冊第19-2章所述鐵皮建築物災害特 性,於92-7號已全面燃燒,92-6號內部無 人受困,且無水線伴隨情況下,仍派員入 室監測煙熱任務,造成2位消防員殉職,均 有違失,爰依法提案糾正。 參、事實與理由: 本案群峪股份有限公司(下稱群峪)位於臺中市大 雅區自立段1228地號(西側),台灣百慕達紙器廠(下稱 台灣百慕達)位於同段1229地號(東側),所稱第一面、 第二面、第三面、第四面,如圖1。依臺中市空間地圖查 詢系統(圖2)、地籍圖資網路便民服務系統(圖3~7),1228 地號,由北至南依序編有92號、92-1及92-3等3個門牌號 碼,1229地號則編有92-5、92-6及92-7等3個門牌號碼。 惟因門牌係業主自行掛設,位於1228地號之群峪,實際 門牌為92-6;位於1229地號之台灣百慕達,實際門牌為 92-7。本案考量臺中市政府都市發展局(下稱都發局) 民國(下同)104年8月24日違章建築認定通知書所述自 立段1128地號違章建築(92、92-3、92-6)、1229地號違 章建築(95-5、92-7)與現況較為相符,且該府消防局災 害搶救報告書、火災原因鑑定報告書均以台灣百慕達
2 (92-7)、群峪(92-6)稱之,故以下仍稱台灣百慕達為92- 7號,群峪為92-6號,合先敘明。 全案經本院108年10月29日履勘火場、聽取臺中市政 府簡報,調取該府、臺中地方檢察署、消防署等有關卷 證,並於109年5月21日詢問內政部消防署及臺中市政府 都發局、消防局等相關人員調查發現,本案農地違章工 廠處理及火災搶救過程,確有違失,應予糾正促其注意 改善。茲臚列事實與理由如下: 一、本案火災現場為農地違章工廠,違反土地分區使用規 定,且經臺中市政府都發局104年8月認定屬新違建, 惟該府迄108年10月3日發生火災,均未依都市計畫法 第79條、建築法第86條規定處罰鍰或命其停止使用或 拆除,顯有違失。 (一)按建築物非經申請直轄市、縣(市)(局)主管建築機 關之審查許可並發給執照,不得擅自建造或使用或 拆除。違反規定者,依下列規定,分別處罰:擅自 建造者,處以建築物造價千分之五十以下罰鍰,並 勒令停工補辦手續;必要時得強制拆除其建築物 (第1款)。擅自使用者,處以建築物造價千分之五十 以下罰鍰,並勒令停止使用補辦手續;其有第五十 八條情事之一者,並得封閉其建築物,限期修改或 強制拆除之(第2款),建築法第25、86條定有明文。 另都市計畫法第79條亦規定:都市計畫範圍內土地 或建築物之使用,或從事建造、採取土石、變更地 形,違反本法或內政部、直轄市、縣(市) (局)政 府依本法所發布之命令者,當地地方政府或鄉、鎮、 縣轄市公所得處其土地或建築物所有權人、使用人 或管理人新臺幣六萬元以上三十萬元以下罰鍰,並 勒令拆除、改建、停止使用或恢復原狀。不拆除、 改建、停止使用或恢復原狀者,得按次處罰,並停
3 止供水、供電、封閉、強制拆除或採取其他恢復原 狀之措施,其費用由土地或建築物所有權人、使用 人或管理人負擔。 (二)查臺中市大雅區中和六路92-6號(群峪)及92-7號 (台灣百慕達),分別座落於自立段1228、1229地 號,係屬都市計畫內農業區。其中,自立段1228地 號上建物門牌地址:中和六路92號(原汎程有限公 司)於103年間經檢舉違規使用,經大雅區公所於 103年10月14日以雅區農字第1030023868號函查復 現場為廠房、未做農業使用,經農業局依農業發展 條例第69條規定,於同年月20日以府授農地字第 1030210373號函通報都市發展局,臺中市政府103 年12月5日府授都測字第1030246718號函並請汎程 公司立即停止違規使用或恢復合法使用,該府都發 局104年1月15日中市都違字第1030215325號「違章 建築認定通知書」並認定自立段1228地號(何世湧) 上面積約2,200平方公尺之建築( 含本案群峪公 司),屬「100年4月20日以前興建完成之既存違章建 築」在案,如圖8。 (三)次查前述汎程公司,除103年間經檢舉違規使用外, 亦屬內政部營建署104年6月1日函請臺中市政府清 查之未登記工廠,該府都發局修復科依大雅區公所 104年8月3日 1查報單,於104年8月14日赴現場勘查, 因現場自立段1228、1229地號涉違章建築,經都發 局依104年空間地圖點位判定,中和六路92、92-3、 92-6號(自立段1228地號)、中和六路92-5、92-7號 (自立段1229地號)均為新違建,如圖9、10,此有都 發局104 年8 月24 日中市都違字第1040131561 、 1 雅區公建字第1040019463號函
4 10401315611號違章建築認定通知書在案可稽。 (四)本案台灣百慕達、群峪於都市計畫農地區作「其他 家庭器具及用品批發業」使用,前經都發局104年8 月24日認定屬「100年4月20日之後興建完成之新違 建」,主管機關除得依都市計畫法第79條規定,處其 土地或建築物所有權人、使用人或管理人新臺幣 (下同)六萬元以上三十萬元以下罰鍰,並勒令拆 除、改建、停止使用或恢復原狀外。亦得依建築法 第86條規定處以建築物造價千分之五十以下罰鍰, 或依104年8月24日違章建築通知書所載:「上列違 章建築經勘察,實質違建部分依法不得補辦建造執 照手續,依建築法第25、86條及違章建築處理辦法 第5條規定,應予拆除。」拆除之,然迄108年10月 3日發生火災,臺中市政府毫無作為,任令大型違建 屹立於都市計畫農業區,斲傷公權力。 (五)綜上,本案火災現場為農地違章工廠,違反土地分 區使用規定,且經臺中市政府都發局104 年8 月認 定屬新違建,惟該府迄108 年10 月3 日發生火災, 均未依都市計畫法第79 條、建築法第86 條規定處 罰鍰或命其停止使用或拆除,顯有違失。 二、群峪(92-6號)與百慕達(92-7號)為同一時間興建之鐵 皮違章工廠,二者雖間隔8米車道,然車道上方有人字 樑型,結構相通,就消防搶救而言,屬同一棟鐵皮建 築;依92-6號1樓「倉儲區」監視器錄影畫面,該區自 凌晨01:45起煙熱即自東南角落大量進入,02:00時 已煙熱瀰漫全區,內部完全無法辨識,惟西屯周小隊 長(03)於92-6號內部無人受困情況下,仍命2隊員入 室執行煙熱監測,致逃生不及殉職,事後,臺中市政 府消防局「災害搶救報告書」、及109年5月21日應本院 詢問所辯「西屯(03)命2員殉職消防員入室前,曾於
5 02:32先與廠商人員進入至92-6號倉儲區樓梯口,當 時『內部無煙熱蓄積,視線良好』」云云,核與監視錄 影畫面、火場全面燃燒等不符,要非可採。 (一)查臺中市大雅區中和六路92-7號(台灣百慕達)、92- 6號(群峪)均為地上2層之農地違章鐵皮建築,分別 作為生產紙盒、紙杯及儲存南北雜貨、免洗餐具、 紙杯、紙盒之用,並在上開兩廠房中間之8公尺防火 通道上方,加蓋人字樑鋼架烤漆浪板,當作避雨用, 在消防上,屬同一棟建築,如圖11。本次火災,起 火點在台灣百慕達(92-7號),民眾於108年10月3日 凌晨1時45分許報案,案經指揮中心派遣火警大雅 分隊、西屯特搜分隊……等進行92-7號搶救及92-6 號周界防護,惟2時26分無線電回報現92-7號建築 物已全面燃燒,2時57分許延燒至92-6號(群峪公 司),造成西屯特搜分隊謝志雄、張哲嘉2名消防員 殉職。災後,該局火災搶救報告書參之一、火災動 態資料及指揮概況表記載:02時32分~02時34分「動 態資料、指揮官處置」,略以:「1.任務指揮官西屯 03先行會同員工進入92-6號建築物內,內部無煙熱 蓄積,視線良好。2.任務指揮官西屯03另率2員執行 92-6號建築物監測煙熱警戒任務。」另臺中市政府 109年2月24日府授消救字第1090040374號復函亦 稱,02時30分~02時34分救火指揮官黃耀星(104)指 派西屯特搜分隊周正斌小隊長(西屯03)執行煙熱 監測警戒任務,西屯03先行會同員工進入92-6號建 築物,內部無煙熱蓄積,視線良好,而另指派2員執 行92-6號建築物監測煙熱警戒任務。嗣臺中市政府 復本院109年5月21日詢問問題,進一步更稱「周小 隊長是第一時間02:32跟藍副理入室查看時,有到 一樓通往二樓樓梯處。02:41帶兩位同仁入室時,
6 到第2個轉角處(辦公室第2個門)前並向兩員指向 前方5公尺右側有通往2樓樓梯,待兩員瞭解後往前 走,周小隊長(西屯03)退出)。」 2等語。 (二)有關西屯特搜分隊周小隊長派員入室偵測煙熱之經 過,訊據周正斌108年10月3日筆錄,略以:「快到3 日凌晨2點時,……我們報出勤,2點10幾分到達現 場,……黃耀星組長就叫我跟謝志雄、張哲嘉去右 邊的工廠(還沒有燒的工廠),看煙、熱有無蓄積, 謝志雄、張哲嘉先去著裝,我先去看現場的路徑, 工廠外當時有人,我請他們幫忙指一下要進去的 路,當時我從外面看進去,還有10幾公尺的能見度, 謝志雄、張哲嘉著裝完,我就拿熱顯像儀,帶到工 廠的前門左右,檢查謝志雄、張哲嘉的服裝有無符 合規格,他們服裝有符合規格,我就帶謝志雄、張 哲嘉到工廠辦公室內右邊第二個門,叫他們去偵測 煙、熱,有什麼狀況要回報,後來我就退到外面去, 我就去注意水線,二樓的屋頂。」 3等語,周小隊長 當時是請工廠外之人幫忙指一下要進去的路,從外 面看,還有10幾公尺的能見度。惟這般說法,與其 同年月25日訊問筆錄:「我要執行任務之前,在92- 6號場入口前方有二名員工,其中一名是男性,我請 該男員工帶我進到92-6號廠。」 4、「我叫他帶我最遠 到要上二樓的樓梯口處。」 5、「是無煙、無熱、能見 度清晰。」 6等語,已完全不同。要言之,訊據108年 10月3日筆錄,周小隊長並未與群峪員工入室勘查, 2 臺中市政府應本院詢問之書面說明資料第10頁。 3 問:能否請您講經過情形? 4 問:108年10月3日你請西屯特搜分隊隊員張哲嘉、謝志雄持TIC至92-6號廠房做煙熱偵測 之前,有無先了解92-6號廠房內的內部隔局、物品的擺設狀況? 5 問:你跟該男員工進入92-6號廠的情形? 6 問:從入口直至二樓樓梯口的情形?
7 同年月25日則改稱與廠商員工至1樓樓梯口入室勘 查,92-6號1樓物品配置圖,如圖12。 (三)惟查臺中市政府消防局火災原因調查鑑定書,群峪 公司1樓內部之倉儲區設有編號4、7、8、9、10等監 視器,火災時持續錄影至02:21許止。依臺中市消 防局提供之監視錄影畫面,本院摘錄00:00(火災 前)、01:45(民眾通報火警時)之監視畫面如圖13, 摘錄02:00、02:20時點之監視畫面如圖14~15,92- 6號、92-7號2F平面配置與CH-1(新1)監視器相對位 置圖,如圖16,92-6號2樓後方鐵板走道監視畫面如 圖17。依據上開監視錄影畫面,清楚可見1樓倉儲區 之煙主要從92-6號東南角大量進入,01:45時內部 陳設尚清晰可見,短短15分鐘,02:00時所有監視 器畫面已完全看不到內部擺設,2樓則於01:45時已 完全看不到內部陳設。佐以無線電譯文、災害搶救 報告書亦記載01:59「濃煙竄出,火煙非常」、01: 16「現在火勢沒有控制」、02:26「92-7號建築物已 全面燃燒」、02:42「裡面都已經全面燃燒」等,周 小隊長於內部無人受困情況下,仍派謝、張二員入 室監測煙熱,事後,於108年10月3日訊問筆錄所稱 「當時從外面看,還有10幾公尺的能見度」、周小隊 長108年10月25日訊問筆錄所稱「我叫他帶我最遠 到要上二樓的樓梯口處。」 7、「是無煙、無熱、能見 度清晰。」 8,以及災害搶救報告書載述「02:32~02: 34時內部無煙熱蓄積,視線良好」、該府109年2月24 日府授消救字第1090040374號函稱「任務指揮官西 屯03先行會同員工進入92-6號建築物,內部無煙熱 7 問:你跟該男員工進入92-6號廠的情形? 8 問:從入口直至二樓樓梯口的情形?
8 蓄積,視線良好。」、臺中市政府109年5月21日復本 院詢問所稱:「周小隊長是第一時間02:32跟藍副理 入室查看時,有到一樓通往二樓樓梯處。」云云, 均非可採。 (四)綜上,群峪(92-6號)與百慕達(92-7號)為同一時間 興建之鐵皮違章工廠,二者雖間隔8米車道,然車道 上方有人字樑型,結構相通,就消防搶救而言,屬 同一棟鐵皮建築;依92-6號1樓「倉儲區」監視器錄 影畫面,該區自凌晨01:45起煙熱即自東南角落大 量進入,02:00時已煙熱瀰漫全區,內部完全無法 辨識,惟西屯周小隊長(03)於92-6號內部無人受困 情況下,仍命2隊員入室執行煙熱監測,致逃生不及 殉職,事後,臺中市政府消防局「災害搶救報告書」、 及109年5月21日應本院詢問所辯「西屯(03)命2員 殉職消防員入室前,曾於02:32先與廠商人員進入 至92-6號倉儲區樓梯口,當時『內部無煙熱蓄積, 視線良好』」云云,核與監視錄影畫面、火場全面燃 燒等不符,要非可採。 三、本案救災現場位於第一大隊轄區,依「無線電通訊使 用原則」,現場直通頻道應使用16號,支援分隊亦同, 惟特搜西屯分隊跨區支援救災,周正斌小隊長命隊員 謝志雄、張哲嘉入室監測92-6號之煙、熱狀況(當時尚 未燃燒),卻未將現場直通頻道改為16號,且自隊員 02:41許入室迄其02:57發現火場煙塵下降,期間約 16分鐘均未與入室人員通信構連,瞭解內部煙熱狀 況,顯有違失。 (一)查臺中市政府消防局組織編制 9,設九個救災救護大 9 摘錄自臺中市政府消防局網頁, https://www.fire.taichung.gov.tw/content/index.asp?Parser=1,3,19。
9 隊 10,下轄五十二個分隊、一個專責救護隊 11及一個 搜救犬隊 12。所稱九個救災救護大隊,實際為八個救 災救護大隊加一個特搜大隊,其中,特搜大隊下設 大誠分隊、西屯分隊、國光分隊、搜救犬隊,本案 特搜西屯分隊,依分隊分布圖,與第六救災救護大 隊之黎明、協和分隊,均位於西屯區。各大隊所轄 分隊如下: 1、第一救災救護大隊(下設:豐原分隊、潭子分隊、 大雅分隊、神岡分隊、頭家厝分隊、豐南分隊)。 2、第二救災救護大隊(下設:東勢分隊、新社分隊、 和平分隊、石岡分隊、梨山分隊、雙崎分隊、谷 關分隊)。 3、第三救災救護大隊(下設:烏日分隊、太平分隊、 霧峰分隊、中山分隊、仁化分隊、大里分隊、十 九甲分隊、溪湳分隊、車籠埔分隊)。 4、第四救災救護大隊(下設:梧棲分隊、犁份分隊、 龍井分隊、沙鹿分隊、清水分隊、大肚分隊、清 泉分隊)。 5、第五救災救護大隊(下設:幼獅分隊、大安分隊、 后里分隊、大甲分隊、外埔分隊)。 6、第六救災救護大隊(下設:南屯分隊、協和分隊、 黎明分隊、春社分隊、工業區分隊)。 7、第七救災救護大隊(下設:中港分隊、信義分隊、 中區分隊、勤工分隊、東英分隊、專責救護隊)。 8、第八救災救護大隊(下設:北屯分隊、文昌分隊、 10 該網站雖列九個救災救護大隊,惟查應為八個救災救護大隊與一個特搜大隊。依臺中市政 府消防局組織規程第5條:本局負責執行重大災害人命救助設特搜大隊。同規程第6條:本局 依轄區特性及業務需要設救災救護大隊。因特搜大隊與救災救護大隊任務,尚屬有間。爰 此,建議仍應依組織規程修正網頁資訊,以資區分。 11 專責救護隊,隸屬第七救災救護大隊。 12 搜救犬隊,隸屬特搜大隊。
10 水湳分隊、四平分隊、東山分隊)。 9、特搜大隊(下設:大誠分隊、西屯分隊、國光分隊、 搜救犬隊)。 (二)次查「臺中市政府消防局無線電通訊使用原則」,依 救災、救護別,分別規定各救災救護大隊及特搜大 隊之無線電通訊使用原則。其中,救災部分,規定 第一、二、四和五救災救護大隊執行救災勤務時, 指揮官與中心通聯,原則上仍以7號頻道為主,但若 遇干擾或通訊不良區域,可改轉……,現場直通頻 道:以16號頻道為主;第三、六、七和八救災救護 大隊執行救災勤務時,指揮官與中心通聯,原則上 仍是以1號頻道為主,但若遇干擾或通訊不良區域, 可改轉……,現場直通頻道:仍以3號頻道為主。至 特搜大隊,可能橫跨全局各個大隊,故使用原則應 依上述各救災救護大隊規定,自行切換適用頻道。 另,臺中市政府消防局設有「網路通報系統」,103 年12月1日、104年8月12日網路通報內容,略以: 1、103年12月1日網路通報(案號A25127) 13,規定救 災無線電頻道使用原則如下: (1)第一~五救災救護大隊:救災頻道(7號),執行 救災勤務時,指揮官與中心通聯,原則上仍以 7號頻道為主,……;現場直通頻道:仍以16號 頻道為主。 (2)第六~八救災救護大隊:救災頻道(1號):執行 救災勤務時,指揮官與中心通聯,原則上仍以 1號頻道為主,……;現場直通頻道:仍以3號 頻道為主。 (3)特搜大隊:救災勤務可能橫跨全局各個大隊, 13 案號A25127。103年12月1日下午04:13:00。通報標題:無線電使用規定。
11 故使用原則應依上述規定,自行切換適用頻 道。 2、104年8月12日網路通報(案號A30703) 14,標題: 「有關與本中心無線電通聯品質改善,再次重申 103年12月1日A25127通報已有規定,本中心再次 重申詳內文」,通報內文略以:(僅摘錄救災部分, 救護略) (1)第一~五救災救護大隊執行救災任務,原則以7 號頻道為主,若遇通訊不良區域,可再改轉其 他頻道與本中心通聯……。 (2)第六~八救災救護大隊執行救災及救護任務, 維持原使用方式,分別使用1號及6號頻道。 (3)特搜大隊則依其所處執勤區參照上述大隊分 隊使用選擇最適頻道。 (4)災害現場當區無線電通聯,請另使用直通頻 道,切勿使用上述頻道。 大雅分隊、特搜西屯分隊原使用頻道,及特搜 西屯跨區支援大雅分隊應使用頻道、實際使用頻道, 如表3。 (三)惟查本案火災現場位於大雅區中和六路,屬第一大 隊大雅分隊轄區,依上開無線電通訊使用原則及 A25127網路通報等規定,其指揮頻道(或稱中繼頻 道)應使用7號頻道,直通頻道應使用16號;而特搜 大隊西屯分隊,與第六救災救護大隊黎明、協和分 隊均位於西屯區,108年10月3日跨區支援第一大隊 轄區救災,其指揮頻道,應由1切至7,現場直通頻 道,亦應由3號頻道切到16號頻道,此有當日跨區支 14 案號A30703,104年8月12日下午04:40:00。通報標題:有關與本中心無線電通聯品質改 善,103年12月1日A25127通報已有規定,本中心再次重申詳內文,請查照。
12 援救災之西屯分隊長陳杰祺小隊長108年10月7日 訊問筆錄:「(問:本案指揮官有統一律定頻道嗎?) 中縣我們有律定16,中市他們應該是3,基本上我們 一定是用16,除非現場指揮官有說要改3號。」在卷 可稽。108年10月3日凌晨2時32分許,指揮官黃耀星 15為恐火勢延燒至92-6號(群峪),命特搜西屯分隊 周正斌小隊長監測92-6號之煙、熱狀況,周小隊長 員2時41分許與隊員謝志雄、張哲嘉入室後退出,訊 據周小隊長108年10月25日筆錄:「3號」(問:你屬 於西屯特搜分隊,你用的救災頻道?)、「3號」(問: 張哲嘉、謝志雄用的救災頻道?),周小隊長與謝、 張2人當時均使用3號頻道,而未將現場直通頻道改 為16號。本院鑑於周小隊長於救災日2時57分使用 指揮頻道 16呼叫「ㄟ志雄快!趕快出來」,於109年5 月21日詢問周小隊長當時帶多少支無線電出勤,案 經周小隊長表示當時帶2支無線電在卷可稽。倘其 當時確攜兩支無線電,則其與入室隊員之無線電通 信測試,更應謹慎,其108年10月7日接受檢察官訊 問所稱「我退出來後,我有按一次,直接按測試, 就『咚』,我有收到訊號,這就是測試。」 17云云, 按該「咚」非無線電通話測試,況其攜帶兩支無線 電,一支在指揮頻道7(與轄區第一大隊同),另一支 在直通頻道3(與第一大隊不同),究該「咚」來自哪 一支無線電,在當下火場環境下,除不易辨別外, 當時使用頻道3者,非僅謝、張2人,周小隊長未依 規定與入室2人通信測試,即有疏漏。再者,周小隊 15 指揮官黃耀星109年5月25日向本院表示當日並未說要改3號。 16 依臺中市政府消防局109年5月21日接受本院詢問提出之說明資料,周小隊長使用7號指揮 頻道。 17 問:幫他們檢查無線電設備時,有無檢查無線電條到同一個頻道?
13 長自隊員2時41分許入室迄其2時57分許發現煙塵 下降,期間約16分鐘,周小隊長均未與其通信構連, 瞭解內部煙熱狀況,並報告指揮官,顯屬違常,待 其發現煙塵下降,雖呼叫已來不及。 (四)綜上,本案救災現場位於第一大隊轄區,依「無線 電通訊使用原則」,現場直通頻道應使用16號,支援 分隊亦同,惟特搜西屯分隊跨區支援救災,周正斌 小隊長命隊員謝志雄、張哲嘉入室監測92-6號之 煙、熱狀況(當時尚未燃燒),卻未將現場直通頻道 改為16號,且自隊員02:41許入室迄其02:57發現 火場煙塵下降,期間約16分鐘均未與入室人員通信 構連,瞭解內部煙熱狀況,顯有違失。 四、本案92-6號與92-7號為同一棟鐵皮建築物,與內政部 消防署消防人員救災安全手冊」第19-2章所述:「火煙 易從屋頂端及牆面鐵皮重疊處的縫隙流竄,且受輻射 熱影響引燃鄰近場所牆面周邊物品,而使火勢極易造 成延燒」同,其煙熱自1時45分許(火災初期)即已陸 續流入92-6號,並蓄積室內,惟特搜西屯分隊周小隊 長無視92-7號於2時26分已全面燃燒,仍於2時41分許 派員進入92-6號執行煙熱監測任務,且未安排水線伴 行,顯有違失。 (一)查內政部消防署考量近年來因搶救鐵皮屋火災已造 成許多消防人員殉職與受傷,原因有屋頂作業踩空 或滑倒而跌落、夾層地板燒穿踩空墜落、夾層坍塌 或遭遇閃燃危害等……,為防範遺憾事故未來再次 發生,故編訂「消防人員救災安全手冊」。其中第19- 2章「搶救鐵皮屋建築物火災安全指導原則」,敘述 鐵皮屋災害特性如下: 1、建築物結構無法阻擋火勢延燒。鐵皮屋各戶間之 牆壁為金屬材質,在屋頂端會有些微縫隙,且牆
14 面鐵皮重疊處受熱後就會變形而產生縫隙,以及 夾層與樓層地板大多使用木板材質,有燒穿及不 穩固的情形,再加上樓梯與貨梯無防火材質的牆 面區隔等無防火區劃之情形,均是煙蔓延的流通 途徑,而無法有效阻擋火勢延燒。 2、建築物棟距小,易受輻射熱與風向影響而加速延 燒。業者為讓鐵皮屋內部有更大使用空間,故在 搭建時未在四周保留空地,與鄰棟鐵皮屋建築緊 鄰搭建,導致火災發生時,鐵皮屋建築物間的棟 距不足以阻擋輻射熱,而加速火勢延燒速度,並 使消防人員難以阻隔延燒。 3、火載量大。倉庫與工廠為鐵皮屋的主要用途,場 所內存放許多物品、貨物、生產原料與成品,起 火燃燒時就有大量可燃物助長火勢。 4、內部空間可蓄積大量高溫濃煙。鐵皮屋均為樓層 挑高建築,發生火災時,起火場所內部可蓄積大 量濃煙,同時也會快速從鐵皮縫隙往鄰近場所流 竄,夜間或假日發生火災,大多無法在火災初期 即時發現,消防人員抵達後火勢可能已達閃燃或 爆燃的條件。 5、火勢快速延燒。鐵皮屋各戶間之牆壁與內部隔間 大多無防火時效,而且與鄰棟鐵皮屋無適當間 距,兩棟鐵皮屋間之通行道路大多不寬,火煙易 從屋頂端及牆面鐵皮重疊處的縫隙流竄,且受輻 射熱影響引燃鄰近場所牆面周邊物品,而使火勢 極易造成延燒,再加上風向因素,下風處延燒速 度就更為快速,抵達火災現場應以阻隔延燒為 主,且要注意車輛停放位置,避免車輛因輻射熱 而受損。 6、救災人員在場所內部定向及定位困難。鐵皮屋建
15 築大多做為工廠或倉庫使用,內部除有辦公室 隔間外,其餘面積大多放置機台、貨架與貨物等, 救災人員在場所內部難以定向與定位,需搭配水 線及照明索進行救災,否則易有迷失方向之情 形。 (二)次查消防法於108年11月13修正公布,增訂第27條之 1,規定中央主管機關為調查消防及義勇消防人員 因災害搶救致發生死亡或重傷事故之原因,應聘請 相關機關(構)、團體代表、學者專家及基層消防團 體代表,組成災害事故調查會(下稱調查會)。本案 消防署比照消防法第27條之1規定,成立「臺中市大 雅區中和六路火災事故調查會」,依消防署接受本 院詢問所提供之說明資料,歷次調查會研商會議均 有委員對於本案派員入室監測任務且未有水線伴 行,提出相關質疑,略以: 1、108年11月8日第1次會議:為何沒有火煙熱,還要 派人入室(92-6號延燒戶)?2位殉職同仁入室後, 後來紙捲擴大燃燒,為何不及早撤出2位殉職同 仁?現場安全官及指揮官並未掌握殉職同仁之位 置(李宗吾委員)。 2、109年1月21日第2次會議: (1)陳崇賢委員:周小隊長下令請2位殉職人員監測煙熱,是 監測1樓還是2樓?為何不攜帶水線進入? (2)簡萬瑤委員:廠房縱深有60公尺,水線部署都在前半段, 廠房有2個鐵捲門,第2個鐵捲門幾乎沒有被破壞,也就 是說水線沒有拉到後面去,沒有有效防阻。這時候派人 員進入可能延燒的廠房進行煙熱監測,可能是個危險的 情況。 (3)施昭宏委員:你們判斷92-6號應該還沒有延燒,所以入 室人員沒有拉水線進入。只是92-7號往92-6號延燒速度
16 遠超過你們的想像。 3、109年3月10日第3次會議,會中陳崇賢委員就執 行戰術的有效性,表示:「同仁進入火場需有水線 防護,旨在建立一個相對安全的空間,讓同仁在 該空間內儘速完成任務。因此防護水線應先行, 以侷限火勢的戰術將火、煙阻隔在前方,讓之後 的同仁方便及安全的執行任務。」等語。 (三)惟查鐵皮屋建築物火災之火煙易從屋頂端及牆面 鐵皮重疊處的縫隙流竄,且受輻射熱影響引燃鄰近 場所牆面周邊物品,而使火勢極易造成延燒,內政 部消防署「消防人員救災安全手冊」第19-2章描述 甚詳。本案火災發生之92-7號,與92-6號雖間隔8米 車道,然其結構相連,中間亦有人字型屋頂相連, 仍屬同一棟建築,則92-7號之燃燒產生之火煙,易 從屋頂端及牆面鐵皮重疊處的縫隙流竄,且受輻射 熱影響引燃鄰近場所牆面周邊物品,而使火勢極易 造成延燒,不難想像。本案大雅分隊凌晨1時53分抵 達火場,2時26分已全面燃燒,迄2時42分仍未控制, 此有臺中市政府109 年2 月24 日府授消救字第 1090040374號函在卷可稽。然該府消防局火災搶救 報告書卻稱2時32分許周正斌小隊長會同員工進入 92-6號,內部無煙熱蓄積,視線良好,並於2時41分 指派謝、張2人進入92-6號執行煙熱監測任務。按指 揮官黃耀星108年10月7日警詢筆錄陳稱 18:「……, 我同時與蘇泰宗小隊長討論2棟建築物間的屋頂 煙、熱流動情形,我認為有必要在尚未燃燒的92-6 號建物實施警戒、監控,於是我再請周正斌小隊長 18 108年10月7日警詢筆錄,問:西屯特搜分隊隊員謝志雄、張哲嘉二位同仁在你到場時,擔 任何任務。
17 擔任任務指揮官,率員實施92-6號建物的煙、熱監 控,以免火勢延燒至該棟。」,以及特搜西屯分隊小 隊長周正斌108年10月3日訊問筆錄 19:「我們到場 後,92-7號已全部燃燒了,輻射熱很強。且上址是 鐵皮屋頂、鐵很容易吸熱。」等語,指揮官黃組長 指派周小隊長監測92-6號煙熱時,92-7號已全面燃 燒,因92-6號與92-7號為同棟鐵皮屋,煙熱早已進 入92-6號並蓄積室內,惟黃指揮官與周小隊長明知 92-7號已全面燃燒,92-6號無人受困,卻於2時41分 在沒有水線伴隨之情況下,派人入室之決定,顯有 可議。 (四)綜上,本案92-6號與92-7號為同一棟鐵皮建築物, 與內政部消防署消防人員救災安全手冊」第19-2章 所述:「火煙易從屋頂端及牆面鐵皮重疊處的縫隙 流竄,且受輻射熱影響引燃鄰近場所牆面周邊物 品,而使火勢極易造成延燒」同,其煙熱自1時45分 許(火災初期)即已陸續流入92-6號,並蓄積室內, 惟特搜西屯分隊周小隊長無視92-7號於2時26分已 全面燃燒,仍於2時41分許派員進入92-6號執行煙 熱監測任務,且未安排水線伴行,顯有違失。 綜上所述,本案火災原發生於百慕達(92-7號),與 被延燒之群峪(92-6號),皆為同一時間興建之農地違章 工廠,違反土地分區使用規定,前經臺中市政府都市發 展局104年8月認定屬新違建,惟該局迄108年10月3日發 生火災,均未依都市計畫法第79條、建築法第86條規定 處罰鍰或命其停止使用或拆除;再者,92-6與92-7號雖 間隔8米車道,然車道上方有人字樑型,結構相通,就消 防搶救而言,屬同一棟鐵皮建築,其煙熱流動,依92-6 19 108年10月3日檢察官訊問筆錄,問:補充?
18 號1樓「倉儲區」監視器錄影畫面,該區自凌晨01:45起 煙熱即自東南角落大量進入,02:00時已煙熱瀰漫全區, 內部完全無法辨識,惟特搜西屯周小隊長(03)於92-7號 已全面燃燒、92-6號內部無人受困且無水線伴隨情況下, 仍命2隊員入室執行煙熱監測,致其逃生不及殉職,事後, 臺中市政府消防局「災害搶救報告書」、及109年5月21日 應本院詢問所辯「西屯(03)命2員殉職消防員入室前,曾 於02:32先與廠商人員進入至92-6號倉儲區樓梯口,當 時『內部無煙熱蓄積,視線良好』」云云,核與監視錄影 畫面、火場全面燃燒等不符,要非可採;又,本案救災 現場位於第一大隊轄區,依「無線電通訊使用原則」,現 場直通頻道應使用16號,支援分隊亦同,惟特搜西屯分 隊跨區支援救災,周正斌小隊長命隊員謝志雄、張哲嘉 入室監測92-6號之煙、熱狀況(當時尚未燃燒),卻未將 現場直通頻道改為16號,且自隊員02:41許入室迄其02: 57發現火場煙塵下降,期間約16分鐘均未與入室人員通 信構連,瞭解內部煙熱狀況等情,均有違失,爰依憲法 第97條第1項及監察法第24條之規定提案糾正,移送行政 院轉飭所屬確實檢討改善見復。
FD06182 | 2021_台湾_彰化乔友大楼火警_监察院纠正案文.pdf
分类:06_境外及港澳台调查报告 | 年份:2021 | 地域:台湾 | 严重程度: | 场所: | 起火原因:燃气/爆炸 | 来源格式:pdf
1
糾 正 案 文
壹、被糾正機關:彰化縣政府。 貳、案 由: 民國110年6月30日晚間,彰化縣喬友大樓百 香果防疫旅館發生火警致4人死亡、21人受 傷,其中1名消防員殉職之重大憾事。經核 彰化縣政府建設處怠未善盡審慎查核之 責,容任該縣喬友大樓內防火避難設施未 完善、防火門開啟、遺失或損壞、大樓內部 管道間垂直及水平區劃未落實填塞、閒置空 區劃未落實填塞、閒置空 間管理不當、建築內部存放及使用泡棉等易 燃材料裝修,肇致火災發生至火勢成長時, 安全梯遭火煙吞噬形成煙囪效應,阻斷消防 人員救災及民眾逃生路徑。該府建設處、城 市暨觀光發展處未善盡審查監督,且資訊橫 向聯繫與勾稽掌握嚴重闕如,致建築物現況 與原核准圖說不一,竟仍能通過變更使用及 登記營業。又該府消防局於火災時未能落實 災害搶救三層安全管理機制、未能即時獲取 災害現場之建築相關資訊,嚴重影響消防人 員入室救援及撤離,終釀成本事件人民傷亡 及消防員殉職,彰化縣政府跨機關協調不周 及監督不力,核有怠失。 參、事實與理由: 民國(下同)110年6月30日彰化縣喬友大樓(或稱 喬友商業大樓)火警,始於同日19時48分彰化縣消防局 救災救護指揮中心接獲派出所轉報:「三民路百香果防疫 旅館那間大樓1樓那邊冒煙……」,陸續派遣各式消防救 災車輛75輛、消防人員184人次投入救災。歷經8小時47 分(從民眾報案至火勢撲滅)救災時間,共計疏散及救
2
出民眾31人,然仍不幸造成東區消防分隊隊員陳志帆殉 職,另1名消防隊員受傷及民眾3名死亡、21名受傷之重 大憾事。 案經調閱彰化縣政府、內政部消防署(下稱消防 署)、勞動部等機關卷證資料,並函請臺灣彰化地方檢察 署(下稱彰化地檢署)於本案偵結後提供偵查卷證 1。嗣 於110年10月6日偕同專家學者實地履勘並聽取彰化縣政 府、消防署簡報。彰化縣政府於110年11月3日提出「彰 化縣喬友大樓火災事件」行政調查報告後,本調查案再 於110年12月22日詢問彰化縣政府及所屬建設處、城市暨 觀光發展處、消防局,以及內政部營建署(下稱營建署)、 消防署等機關人員。 復因有消防人員殉職,涉及消防法第27條之1 2規 定,中央主管機關應組成災害事故調查會(下稱內政部 災調會),並製作事故原因調查報告,提出災害搶救改善 建議事項及追蹤改善建議事項之執行。爰內政部於本案 發生後即組成災調會 3,並於111年5月2日審議通過「彰 化縣原喬友百貨舊大樓火災消防人員殉職事故原因調查 報告 4」(下稱內政部災調報告)。據各相關機關函復、履 勘、詢問前、後提供卷證、相關行政調查報告及內政部 災調報告等資料 5後調查發現,經核彰化縣政府建設處、
1彰化地檢署於110年1月6日彰檢秀荒110偵7706字第1119000581號函送檢察官起訴書(110年 11月30日110年度偵字第7706、11227號)、不起訴處分書(110年度偵字第7706、8668、11227 號)。 2消防法第27條之1規定:「中央主管機關為調查消防及義勇消防人員因災害搶救致發生死亡或 重傷事故之原因,應聘請相關機關(構)、團體代表、學者專家及基層消防團體代表,組成災 害事故調查會。調查會應製作事故原因調查報告,提出災害搶救改善建議事項及追蹤改善建 議事項之執行。」 3召集人:陳次長宗彥,副召集人:消防署謝副署長景旭,委員:謝榮堂、盧家惠、林謙哲、 陳崇賢、林宜君、楊欣潔、洪肇嘉、吳鴻鈞、蕭雅文、李宗吾、欒中丕。 4內政部災調報告以災調會的任務是在找出「消防員及義勇消防人員因災害搶救致發生死亡或 重傷事故之原因」,而非「災害發生原因」。調查報告的改善建議是期望未來在相同的情境下 不再發生消防員及義勇消防人員死亡或重傷的結果,而非防止災害發生。 5彰化縣政府110年9月11日府授消救字第1100297884號、110年9月27日府授消救字第11003365 27號、110年11月5日府授消救字第1100388623號、110年12月21日府授消救字第1100459833
3
城市暨觀光發展處怠未善盡審慎查核之責,消防局於火 災時未能落實災害搶救三層安全管理機制、未能即時獲取 災害現場之建築相關資訊,終釀成本事件人民傷亡及消防 員殉職憾事,確有怠失,應予糾正促其注意改善。茲臚 列事實與理由如下: 一、彰化縣消防局於110年6月30日19時48分獲報該縣百 香果防疫旅館所在之喬友大樓發生火警,自民眾報案 至火勢撲滅歷經8小時47分救災時間,共計疏散及救 出民眾31人,惟仍造成該局東區消防分隊隊員殉職, 另1名消防隊員受傷及3名住民死亡、21名受傷之重大 憾事。本案起火原因為2樓西北側手扶梯下方疑似因 菸蒂引起火災,復因百香果商旅負責人等3人,於火 警發生時關閉授信總機、未將逃生梯防火門關閉致未 能阻絕火災濃煙、未掌握黃金逃生時間即時廣播通報 及疏散住客等不當作為,經彰化地檢署檢察官以過失 致死罪提起公訴。然對於火勢快速蔓延擴大致消防員 殉職及人員傷亡,係肇因於該大樓防火避難設施未完 善、防火門開啟、遺失或損壞、大樓內部管道間垂直 及水平區劃未落實填塞、閒置空間管理不當、建築內 區劃未落實填塞、閒置空間管理不當、建築內 部存放及使用泡棉等易燃材料裝修,致火勢成長時, 安全梯遭火煙吞噬形成煙囪效應,阻斷消防人員救災 及民眾逃生路徑。而該府建設處、城市暨觀光發展處 未善盡審查監督,且資訊橫向聯繫與勾稽掌握嚴重闕 如,致建築物現況與原核准圖說不一,竟仍能通過變 更使用及登記營業。另消防局於火災時未能落實災害 搶救三層安全管理機制、未能即時獲取災害現場之建
號、消防署110年10月5日消署救字第1100600346號、內政部111年1月4日內授營建管第11108 00164號、勞動部110年9月3日勞動關1字第1100127982號等函及其所附佐證文件;各直轄市、 縣市政府對於轄內複合式大樓內部分樓層閒置未使用執行建築物公共安全檢查、消防安全設 備檢修申報等情復函。
4
築相關資訊,嚴重影響消防人員入室救援及撤離,終 釀成本事件人民傷亡及消防員殉職憾事。彰化縣政府 跨機關協調不周及監督不力,核有怠失。 (一)喬友大樓建築係78年10月21日取得(78)彰工管(建) 字第0017588號建造執照、81年1月17日取得(80) 彰工管(使)字第022109號使用執照,本案發生時 營業樓層為1樓為B1類遊藝場(因疫情未營業)及6 至9樓為B4類旅館使用,其餘樓層為閒置或廢棄空 空,如圖1所示。百香果商旅計有2處出口,一處面 彰化市中正路(南側),另一處面彰化市三民路(北 側),2處出口均設置逃生梯(旅館上下4樓層共有8 個防火門)直通地面,惟中正路側之電梯2座已毀 損而封閉,另三民路側之電梯3座,其中客梯1座及 貨梯各1座則均可正常運作,且2處出口之逃生梯在 各樓層均有通道相通,若有火警發生,在確認旅館 所在之樓層尚無火勢,且經由監視器確認煙霧是在 樓下,而煙霧狀況尚不嚴重時,房客(即住民)可 經由電梯之方式快速疏散,若對電梯狀況有所疑 慮,亦可經由2側之逃生梯盡速撤離至地面 6。
6 彰化地檢署檢察官起訴書110年度偵字第7706、11227號。
5
資料來源:彰化縣政府簡報。 圖1 喬友大樓各樓層用途、使用狀況 (二)據彰化縣政府查復、彰化縣消防局火災搶救報告書 及「彰化縣喬友大樓火災事件」行政調查報告, 本案起火戶為喬友大樓(彰化縣彰化市三民路○○ 號、彰化市中正路一段○○○號)2樓,起火處位 於該址2樓西北側手扶梯下方附近。火流延燒路徑 研判為火勢從2樓起火處起燃後,經由西北側手扶 梯往1樓、3樓、4樓延燒,造成1樓西北側附近、3 樓整層、4樓北側受火勢燒損,擴大延燒因素為西 北側手扶梯垂直貫穿2、3、4樓,底部貫穿2樓樓地 板,造成1、3、4樓受火勢延燒,火勢控制於4樓, 未向上擴大延燒,本事件百香果商旅有住民之7、 8、9樓層無火流現象。復依本院偕同專家學者實地 履勘指出,於3樓廢棄KTV因原裝潢使用大量泡棉 7為
7 PU泡棉係由二異氰酸甲苯與多元醇合成,並加一些矽油,分解後的危險性如下:(一)窒息
6
火勢迅速擴大原因,再依內政部災調報告指出該大 樓管理未完善,閒置空間堆積雜物,本建物2樓至4 樓及10樓以上閒置空間建築內部存放及使用泡棉 等易燃材料裝修,火載量 8甚大,易生治安、縱火、 安全管理之疑慮。本事件搶救時序概要如圖2。
資料來源:彰化縣政府簡報。 圖2 本事件火災搶救時序概要 (三)復據彰化縣消防局火災原因調查鑑定書(110年7月
性的黑色霧滴:PU泡狀彈性體於240℃分解(不同於閃燃500℃),產生碳、氫、氧、矽、氮、 氯等組成的黑色霧滴,比空氣重,分子量100~400、大小約40微米具黏性的高溫霧滴(陳志帆 罹災房間天花板及較高處均乾淨,黑色霧滴分布在較低處,使人吸入後窒息)。(二)PU泡棉於 火場分解特性:PU泡棉外面有一層裝潢材,所以就算外面裝潢材火焰熄滅,但內部泡狀彈性 體仍化繼續解離持黑色霧滴,至全部分解才結束。(三)爆燃性:PU泡棉分解成大量黑色霧滴 後,如裝潢材內部氧氣重新進入,會使火焰重新產生,導致產生爆燃現象(類似蒸氣雲爆炸)。 8 火載量為代表建築物或防火區劃內所有可燃物於完全燃燒時所釋放出熱能的總數,一般定 義為單位樓地板面積之可燃性物質的熱含量,或密閉空間中可燃性物質的總熱含量,則此時 稱每單位面積之火載量為火載量密度。資料來源:可燃物火載量先期評估技術建立與應用, 內政部建築研究所自行研究報告,94年12月。
7
28日)起火原因研判以菸蒂引起火災之可能性較 大。再據彰化地檢署於110年1月6日彰檢秀荒110偵 7706字第1119000581號函送檢察官起訴書 9(110年 度偵字第7706、11227號),以過失致死將喬友大樓 6至9樓供防疫旅館使用之百香果商旅負責人蔡○ ○、管理員吳○○、會計業務人員沈○○提起公 訴,內容如下: 1、110年6月30日19時30分許至19時45分許,喬友商 業大樓 2樓西北 側手扶梯下方附近, 側手扶梯下方附近,疑似因菸蒂 而引起火災,旋於同日19時47分18秒許(上開旅 館8樓 消防廣播器位置監視錄影顯示之時間 消防廣播器位置監視錄影顯示之時間),設 置於該旅館 8樓 之火災警報器響起,並自動發出 之火災警報器響起,並自動發出 電子聲音提醒房客逃生避難,蔡○○、吳○○及 沈○○均明知依旅 館業管理規則第 規則第25條規定,遇 有火災、天然災害或緊急事故發生,對住宿旅客 客 生命、身體有重大危害時,應即通報有關單位、 疏散旅客,並協助傷患就醫,且渠等亦曾就上開 客,並協助傷患就醫,且渠等亦曾就上開 事項進行演練,及 演練,及蔡○○、吳○○均知遇有火災 時,應注意 旅館防火門是否確實關閉,以發揮防 防火門是否確實關閉,以發揮防 火門阻絕或延緩濃煙竄入之作用,爭取人命救助 時間,而又無不能注意之情事, 能注意之情事,蔡○○、吳○○ 及沈○○竟均疏未注意,蔡○○僅往上勘查旅館 7、8、9樓 未發現火災後,便在 未發現火災後,便在8樓 授信總機以擴 授信總機以擴 音告知 旅館內所有人員,表示「消防測試中,勿 內所有人員,表示「消防測試中,勿 慌張」等語,並將授信總機電源關閉,使授信總 機無法繼續發出巨大警示聲響,致房客誤以為警 報已經解除,且蔡○○與吳○○為便於巡查,竟 將旅館 8樓 及 及7樓靠三民路 側之逃生梯防火門分 側之逃生梯防火門分
9另彰化地檢署檢察官不起訴處分書(110年度偵字第7706、8668、11227號),蔡○○過失傷害 案件業成調(和)解,應為不起訴處分。
8
別以大型塑膠桶及滅火器擋住,而於離開時疏未 開時疏未 將該樓阻絕火災濃煙之前開逃生梯防火門關上 阻絕火災濃煙之前開逃生梯防火門關上。 2、嗣蔡○○又前往6樓 勘查,發現天花板已經出現 勘查,發現天花板已經出現 煙霧,空氣中也聞到火燒的味道,約此同時,沈 ○○透過櫃臺監視器亦已發現喬友大樓 1樓 已有 已有 些微煙霧,詎蔡○○、沈○○在確認大樓已經發 已經發 生火警後,竟未再次向 旅館房客廣播警示,使住 房客廣播警示,使住 宿旅客得以在第一時間掌握正確訊息即時疏 客得以在第一時間掌握正確訊息即時疏 散,亦未為其他疏散旅客措施,且任由 客措施,且任由8樓 及 及7樓 之防火門開啟著,其2人即各拿1個滅火器欲搭乘 電梯下樓,同一時間,因聽聞警報聲 而自行跑出 跑出 隔離區之房客 區之房客曾○○父子2人(均未成傷)詢問沈 ○○是要往樓上還是要往樓下跑 ,後來其 其2人跑 至7樓 處,而與 處,而與沈○○及蔡○○一起下樓,待抵 ,待抵 達1樓發現樓 下確有火警後, 下確有火警後,蔡○○並未趕緊返 回旅館救助、疏散旅客,復未在火勢尚未失控之 未在火勢尚未失控之 時,通知人尚在櫃臺之吳○○轉知房客趕緊利用 電梯或逃生梯疏散,僅沈○○1人返回旅館 7樓 , , 然沈○○返回7樓 後,僅在 後,僅在7樓 靠近櫃臺側之走道 靠近櫃臺側之走道 (按該 旅館之走道係呈長方型,以走道為劃分, 之走道係呈長方型,以走道為劃分, 部分客房係位於各該樓層之外側,部分客房則係 層之外側,部分客房則係 位於各該樓層之中間部分 層之中間部分)向房客大喊「你們先 留在房間內,現在消防人員 來處理了,你們不要 要 開門,不要讓煙跑進去」等語 要讓煙跑進去」等語,而與吳○○均疏 未於濃煙竄升上來前及時對房 客進行疏散,復疏 疏 未掌握黃金逃生時間及時前往 逃生時間及時前往8樓 授信總機處再 授信總機處再 向房客進行廣播,或以旅館分機或手 機電話聯絡 絡 等方式,告知房客正確之火災訊息,俾房客得以 判斷是否自行逃生避難 逃生避難。嗣因蔡○○、吳○○及 沈○○未於火災發生時採取疏散旅客措施, 客措施,復擅
9
行 將授信總機電源關閉,致房客誤以為警報已經 將授信總機電源關閉,致房客誤以為警報已經 解除,而錯失逃生時機,蔡○○、吳○○復 疏未 疏未 將8樓 、 、7樓 防火門關閉,加快濃煙竄往 防火門關閉,加快濃煙竄往8樓 及 及9 樓,且沈○○返回旅館後,復未再次向房客進行 廣播或以其他方式通知房客 旅館所在之大樓發 發 生火警之訊息,且未及時疏散房客傷亡。 3、因蔡○○、吳○○及沈○○上開疏失,致使消防 隊員陳志帆等人必須入室救援搜索受困之眾多 房客,嗣消防隊員陳志帆因受困民眾人數過多救 過多救 援作業秏時致氣瓶 行將用盡而不得不進入沒有 進入沒有 對外開窗之客房內避難,嗣因吸入過多一氧化碳 中毒,經搶救無效而殉職。 (四)本院實地赴喬友大樓履勘及聽取簡報,對於本案殉 職消防人員受困及其救援過程達近6小時,彰化縣 政府查復係受下列救災阻礙因素影響: 1、本案現場2、3、4樓為閒置未加管理的大樓建築, 防火避難設施未臻完善,防火門開啟、遺失或損 壞,大樓內部管道間垂直區劃、水平區劃未落實 區劃未落實 填塞,使現場消防人員及民眾於火災報案後30分 鐘內即遭遇大量濃煙,阻礙救援動線,增加救援 的困難與危險。 2、現場2至4樓內部電扶梯,造成火煙延燒路徑,且 內部使用易燃材料裝修,造成火勢迅速擴大燃 燒,增加侷限火勢的困難度。 3、火勢成長下,2座安全梯均被火煙吞噬,形成煙 囪效應,阻斷消防人員入室救災及民眾避難逃生 的路徑,僅可倚靠雲梯車執行高空作業,導致救 災效率緩慢。 (五)經查,喬友大樓6至9樓為百香果商旅作防疫旅館使 用,商業旅館及防疫旅館皆屬「各類場所消防安全
10
設備設置標準」(下稱設置標準)第12條第1款第3目 之「旅館」用途分類,屬甲類場所,其消防安全設 備均依設置標準第14條至第192條之1逐條檢討設 置,並無差異。本案火災因百香果商旅負責人等因 其不當作為已遭彰化地檢署檢察官提起公訴,然對 於火勢快速蔓延擴致消防員殉職及人民傷亡,肇因 於該大樓防火避難設施未完善、閒置空間管理不 當、該府相關機關協調未盡周全,致建築物現況與 原核准圖說不一卻仍能通過變更使用及登記營業 等情,再有於火災時之災害搶救安全管理機制未落 實、災害現場獲取之建築相關資訊有限,均嚴重影 響消防人員救援及撤離,此有彰化縣消防局火災搶 救報告書及該府行政調查報告載明:「大樓建築防 火避難設施未臻完善」、「現場2至4樓內部手扶梯, 造成火煙延燒路徑,內部易燃材料裝修,造成火勢 迅速擴大燃燒」、「未落實三層安全管理機制」等, 內政部災調報告指出本案致消防員殉職之次要成 因 10略以:「建築物垂直防火區劃失效」、「所有權人 或使用人未維護建築物之合法使用」、「公安申報縣 政府先備查、再排查,未能即時發現建築物公共安 全之隱憂」、「縣政府相關機關協調未盡周全,致建 築物現況與原核准圖說不一仍能通過變更使用及 登記營業,衍生危害」、「未落實隊員、帶隊官及指 揮官之三層安全管理機制」、「災害現場獲取之建築 相關資訊有限,影響消防人員救援及撤離」等內容 可稽,彰化縣政府為地方主管建築機關、主管地方 觀光事務及消防主管機關,跨機關協調不周及監督 不力,難辭其咎。又於本事件後該府消防局已就相
10 指該成因雖無法直接導致事故發生,但其存在具相當高的程度(風險)有促使、加速或有 助事故發生。
11
關人員進行懲處 11,然該府建設處、城市暨觀光發 展處卻遲未議處相關失職人員,確有未當。 (六)另內政部災調報告亦指出,本次火災消防局於派遣 時已知為防疫旅館,雖有調派10輛防疫救護車及4 輛一般型救護車執行現場後送勤務,並於21時05分 啟動大量傷病患機制,惟並未調動衛生量能救護 車,現場亦未設置大量傷病患集結區進行傷患處置 及後送等情。此案對象為隔離檢疫人員,疏散此類 大量傷病患主要涉及衛生體系之大量傷患處置、交 通主管單位之防疫旅館管理、消防單位之防火管理 等,惟各機關雖有各自有主管法規規定,尚需加強 機關間之橫向聯繫機制,故建議規劃建置防疫旅館 火災疏散大量傷病患現場之集結、檢傷、管制、後 送等處置機制。 (七)綜上,彰化縣消防局於110年6月30日19時48分獲報 該縣百香果防疫旅館所在之喬友大樓發生火警,自 民眾報案至火勢撲滅歷經8小時47分救災時間,共 計疏散及救出民眾31人,惟仍造成該局東區消防分 隊隊員殉職,另1名消防隊員受傷及3名住民死亡、 21名受傷之重大憾事。本案起火原因為2樓西北側 手扶梯下方疑似因菸蒂引起火災,復因百香果商旅 負責人等3人,於火警發生時關閉授信總機、未將 逃生梯防火門關閉致未能阻絕火災濃煙、未掌握黃 金逃生時間即時廣播通報及疏散住客等不當作 為,經彰化地檢署檢察官以過失致死罪提起公訴。
11 彰化縣政府110年11月3日「彰化縣喬友大樓火災事件」行政調查報告,代理局長自行請辭 代理局長職務以負起指揮督導不周之行政責任,另依彰化縣消防局提供該局人員懲處情形, (一)彰化東區分隊劉小隊長,110年6月30日彰化市喬友大樓火災搶救案件,於火場單獨脫隊, 且未將脫隊情形通知指揮官,記過1次。(二)彰化東區分隊蕭小隊長,110年6月30日彰化市喬 友大樓火災搶救案件,因故於火場中變更任務,變更前未獲指揮官同意,申誡1次。(三)第一 大隊劉大隊長,110年6月30日彰化市喬友大樓火災搶救案件,對屬員工作違失督導不週,申 誡1次。
12
然對於火勢快速蔓延擴大致消防員殉職及人員傷 亡,係肇因於該大樓防火避難設施未完善、防火門 開啟、遺失或損壞、大樓內部管道間垂直及水平區 區 劃未落實填塞、閒置空間管理不當、建築內部存放 及使用泡棉等易燃材料裝修,致火勢成長時,安全 梯遭火煙吞噬形成煙囪效應,阻斷消防人員救災及 民眾逃生路徑。而該府建設處、城市暨觀光發展處 未善盡審查監督,且資訊橫向聯繫與勾稽掌握嚴重 闕如,致建築物現況與原核准圖說不一,竟仍能通 過變更使用及登記營業。另消防局於火災時未能落 實災害搶救三層安全管理機制、未能即時獲取災害 現場之建築相關資訊,嚴重影響消防人員入室救援 及撤離,終釀成本事件人民傷亡及消防員殉職憾 事。彰化縣政府跨機關協調不周及監督不力,核有 怠失。
二、彰化喬友大樓為30年屋齡建物,其所有權人或使用人 應維護建築物合法使用及防火避難設施完善,確保公 共安全無虞,然喬友大樓已是第4度發生火警,此次 大火讓火神再度掉眼淚。據彰化縣政府火災搶救報告 及行政調查報告,均指出該建築物未合法使用、防火 避難設施未妥善維護致防火區劃失效,造成本案救災 過程中火煙迅速往上擴大蔓延,百香果商旅及安全梯 間濃煙密布,為本事件致災原因。然彰化縣政府建設 處怠未善盡審慎查核之責,且據內政部災調報告更指 出彰化縣政府於建築物公共安全檢查申報採行先備 查、再排查,整棟大樓只有1樓遊藝場及6樓至9樓百 香果商旅辦理過公安申報,但建築物有防火及防火避 難設施處於失能狀態等違規情事,肇致未能即時發現 建築物公共安全之隱憂。甚且該府建設處、消防局、
13
城市暨觀光發展處各行其是,未能善盡相互勾稽查 核,使業者變更防火區劃、分間牆、通道、陽台外推 等,提出與消防圖說竣工未盡相符的房間配置仍能通 過變更使用及登記營業,使民眾入住於危及公共安全 風險之防疫旅館。公安申報及抽複查機制的不完善, 造成公共安全的空窗期,致消防員須冒險深入火場、 入室搜救,卻身陷險境而殉職,彰化縣政府確有怠失。 (一)按建築法第77條第1項規定,建築物所有權人、使用 人應維護建築物之合法使用與其構造及設備之安 全。同法第77條第4項規定,主管建築機關對建築 物公安檢查簽證結果,得隨時派員或定期會同各有 關機關複查,場所抽查比率。次按彰化縣建築物公 共安全檢查申報案件複查執行要點第6點規定為建 築物公共安全檢查申報複查率應達35%以上。 (二)彰化縣政府查復,喬友大樓有營業樓層為一樓為B1 遊藝場使用及6至9樓為B4旅館使用,上開營業場所 均依上該規定申報公安在案;其中一樓「新鑫馬電 子遊戲場業」109年度依規申報合格備查,並於110 年3月25日由該府委託社團法人彰化縣建築師公會 辦理複查,結果為合格。110年度申報因疫情原因, 依內政部110 年5 月19 日內授營建管字第 1100808203號函示得展延至本年度第3季前(9月底 前)辦理;另6至9樓「百香果商旅」業已委託專業 檢查人於110年3月26日至110年4月26日就「防火避 難設施」及「設備安全」項目檢查合格。然喬友大 樓於110年7月14日配合內政部災調會現場勘查,有 下列未符圖說之情形: 1、2至4樓:排煙室已不存在,與原竣工圖說不符。 2、7至9樓: (1)8、9樓建築圖面之空調機房及儲藏室實際作為
14
客房使用。 (2)9樓排煙室內增建廁所及原自行增設房間拆除 中。 (3)三民路側安全梯9樓往10樓間以木板隔間阻礙 通行。 (三)經查,彰化縣消防局火災搶救報告書檢討指出「現 場救災阻礙因素」如下: 1、大樓建築防火避難設施未臻完善,現場2、3、4 樓為閒置空間,防火門開啟或遺失,9樓防火門 火災後遭民眾開啟,內部管道間垂直區劃、水平 區劃未落實填塞,使大量濃煙迅速竄出向上並流 入旅館內部,造成現場消防人員及民眾於火災報 案後30分鐘內,即遭遇大量濃煙。 2、現場2至4樓內部手扶梯,為火煙延燒路徑,內部 PU泡棉易燃材料裝修,造成火勢迅速擴大燃燒, 增加侷限火勢的困難度。 3、火勢迅速成長,大樓2座安全梯均被火煙吞噬, 形成煙囪效應,阻斷消防人員入室救災及民眾避 難逃生的路徑,僅可倚靠雲梯車執行高空作業, 導致救災效率緩慢。 (四)再查,彰化縣政府行政調查報告指出,該府建設處 針對建管缺失部分,在變更使用執照、建築物公共 安全檢查申報,以及管理委員會和所有權人,應各 有其責,如下: 1、管理委員會管理部分:未善盡管理責任,擅自封 閉9、10樓安全梯且未維護安全梯之完整防火區 劃。 2、所有權人未依法使用部分:按建築法第77條第1 項規定,建築物所有權人、使用人應維護建築物 之合法使用,以及構造及設備之安全。
15
(1)2至4樓所有權人未善盡維護責任,致建築物防 火門及防火區劃破壞。 (2)7至9樓所有權人擅自變更使用陽台外推。 3、變更使用執照部分:部分管道間防火填塞不全, 監造人及施工廠商未善盡督工責任。 4、建築物公共安全檢查申報部分: (1)營業場所停止營業部分:營業所依現況認定為 停止營業者,免辦理建築物公共安全檢查申 報。本案喬友大樓2、3、4樓閒置情形依規定 免辦理建築物公共安全檢查。 (2)喬友大樓7、8、9樓部分:建築物公共安全檢 查人申報不實,未依法落實檢查申報並意圖使 公務員登載不實。 5、彰化縣政府建設處未善盡審慎查核即予備查。 (五)另據彰化縣政府就百香果商旅(防疫旅館)管理查 復,該府城市暨觀光發展處依交通部觀光局99年12 月3日觀賓字第0990600658號函所示,對於合法旅 宿業每年稽查1次。 百香果商旅為彰化縣合法旅 館,原排訂於110年8月份進行聯合稽查作業,另防 疫旅館部分就衛生福利部所發布因應 部所發布因應COVID-19疫 情防疫旅宿檢核表進行檢核作業。喬友大樓於110 年6月30日火災發生後,該處確認當日住客之客 房,經查有非屬合法核准之客房,有擴大營業客房 事實,該府即依法裁處並命其擴大部分勒令歇業 12。該府城市暨觀光發展處表示依據「旅館管理規 則」第29條規定,僅掌握旅宿業之房間配置圖,另 旅館之建築管理與防火避難設施及防空避難設
12 發展觀光條例第55條第7項:「觀光旅館業、旅館業及民宿經營者,擅自擴大營業客房部分 者,其擴大部分,觀光旅館業及旅館業處新臺幣5萬元以上25萬元以下罰鍰。擴大部分並勒令 歇業。」
16
備、消防安全設備、營業衛生、安全防護,由各有 關機關逕依主管法令實施檢查。依旅館業管理規則 第10條第2項規定:「地方主管機關受理申請旅館業 登記案件,必要時,得邀集建築及消防等相關權責 單位共同實地勘查」,旅館文件申請無規定須會辦 建築及消防等相關權責單位;然目前作業流程皆會 辦相關權責單位等云云。 (六)惟據內政部災調報告揭示,喬友大樓有「建築物垂 直防火區劃失效」、「所有權人或使用人未維護建築 物之合法使用」、「公安申報縣政府先備查、再排 查,未能即時發現建築物公共安全之隱憂」、「縣政 府相關機關協調未盡周全,致建築物現況與原核准 圖說不一仍能通過變更使用及登記營業,衍生危 害」等情事,為造成本案消防人員殉職之次要成 因,分述如下: 1、建築物垂直防火區劃失效: (1)建築物在三民路側及中正路側各有1座安全 梯,三民路側安全梯、電梯及管道間鄰近起火 處。因1樓至4樓2座安全梯之防火門未關閉(或 無防火門),加上百香果商旅客梯停於2樓且梯 門開啟,又管道間維修口未設門敞開,破壞垂 直防火區劃,煙熱由安全梯、電梯及管道間向 上蔓延(如圖3)。 (2)現場另發現,9樓百香果商旅中正路側安全梯之 常閉式防火門為開啟狀態,三民路側安全梯9 樓往10樓間設有木門阻擋,造成熱煙累積下 沉,致大量濃煙由該防火門進入百香果旅館之9 樓空間(如圖4)。
17
(左)2樓B梯防火門未關閉,外觀呈北低南高煙燻痕跡。 (右)2樓A梯呈開啟狀態,外觀無明顯煙燻情形。 資料來源:內政部災調報告,僅以2樓防火門為例。 圖3 本事件建築物垂直防火區劃失效佐證照片
(左)一般旅客使用之電梯停於2樓且呈開啟狀態。 (右)2樓B梯旁管道間未封閉。
18
資料來源:內政部災調報告。 圖4 本事件建築物9樓B梯間往10樓設有木門阻擋佐證照片
築物2樓至4樓防火門及防火區劃遭破壞、且有排 煙室損毀之情形;又彰化縣政府調查7樓至9樓所 有權人違規變更使用陽台外推,8樓至9樓空調機 房及儲藏室遭百香果商旅違規變更為客房使 用,9樓排煙室內遭百香果商旅違規增建廁所及 增設房間,以陳志帆最後避難的9627房為例,在 消防局竣工圖是供儲藏室使用,但業者卻變為房 間使用,並經現場勘查時發現建築區劃(垂直及 水平區劃,如管道間及天花板等 區劃,如管道間及天花板等)防火填塞不確 實(如圖5、圖6)。業主放任該場所違法使用, 致火災發生時造成嚴重傷亡。
19
(左)浴室排風管連接至塑膠管,開口貫穿至走道天花板上方。 (右)天花板上方東南側配置情形,天花板上方與樓地板、橫樑底 部有間隙。 資料來源:內政部災調報告(摘列)。 圖5 本事件殉職消防員所在房間管道間及天花板間隙佐證照片 (左)房間門北段外側與地板約有1.1公分縫隙。 (右)房間門中段外側與地板約有1公分縫隙。 資料來源:內政部災調報告(摘列)。 圖6 本事件殉職消防員所在房間門與地板縫隙佐證照片
20
建築物公共安全之隱憂:整棟大樓只有1樓遊藝 場及6樓至9樓百香果商旅辦理過公安申報,但建 築物有多處違規等情事,公安申報書未提報或勾 列免申報項目,致未發現建築物防火及防火避難 設施處於失能狀態。百香果商旅屬於110年3月26 日至110年4月26日就「防火避難設施」及「設備 安全」項目業委託專業檢查人檢查合格,並於110 年5月19日予以備查,爰尚未納入抽複查場所, 即於6月30日發生火災。公安申報及抽複查機制 的不完善,造成公共安全的空窗期,促使本案事 故發生。 4、縣政府相關機關協調未盡周全,致建築物現況與 原核准圖說不一仍能通過變更使用及登記營 業,衍生危害: (1)本案建築物申請第6次變更使用將8、9樓變更為 旅館使用,108年1月24日建設處審查建築物變 更使用執照圖、108年5月27日消防局審查建築 物消防安全設備設計圖與108年10月1日消防局 審查建築物消防安全設備竣工圖之圖說隔間9 樓均為10間,108年12月27日建設處審查建築物 變更使用執照併案辦理室內裝修所附文件9樓 竣工圖隔間數為17間,109年2月26日城市暨觀 光發展處審查准予設立登記所檢附文件照片9 樓房間數為23間,百香果商旅110年上半年度消 防安全檢修申報之平 面圖 面圖9樓依實際使用情形 所劃設隔間數為25間;亦即該場所申請辦理變 更使用併室內裝修時,申請審查建築圖說隔間 數,顯與建築竣工圖隔間數未盡相符。 (2)建設處為民眾申請辦理變更使用之主責機關,
21
應告知民眾須經相關權管機關查驗符合相關規 範,建設處同時也是最後審查准予變更使用之 機關,民眾明顯由原辦理變更使用所檢附建築 圖說10間,至辦理建築竣工圖審查,隔間由拆 除分間牆及占用原規劃走廊而增加至17間,參 照該縣建設處受訪人員意見,應辦理變更設 計,惟未依規定辦理。爰此,建管單位於變更 程序當中尚待改善,以建立相關審查作業把關 機制,符合建築相關法令等意旨,以達保障民 眾生命財產安全。 (3)除9627外,另9618、9628房在建設處竣工圖上 也是供機房使用,之後民眾再於申請旅館登記 時,由申請變更使用併室內裝修竣工圖房間數 17間,再增加為城市暨觀光發展處准予文件之 照片合計23間,城市暨觀光發展處雖有派員會 勘(未會同建設處及消防局)卻未發現,因機關 間的協調未臻周全,造成建築管理的漏洞,未 按圖施工、使用致使防火、防火避難設施有缺 陷的場所仍能取得證照違規營業。 (七)因此,建築法第1條揭示立法目的為維護公共安全, 是建築物所有權人、使用人應維護建築物之合法使 用與其構造及設備之安全至為明確,然地方政府主 管建築機關對建築物公安檢查簽證結果,得隨時派 員或定期會同各有關機關複查,藉以維護建築物公 共安全。彰化縣政府建設處為主管建築機關,維護 建築物公共安全檢查責無旁貸,而本案救災過程, 消防局救火指揮官下令採行雲梯車射水滅火,卻因 建築防火及防火避難設施未能發揮功效,造成火煙 迅速往上擴大蔓延,百香果商旅及安全梯間濃煙密 布,肇致本案殉職消防員陳志帆陷入險境且無退路
22
據「旅館管理規則」第29條規定僅掌握旅宿業之房 間配置圖。然業者變更防火區劃、分間牆、通道、 陽台外推等,提出與消防圖說竣工未盡相符的房間 配置仍能取得設立登記。百香果商旅申請時依規定 應檢附建築物核准使用證明文件,本案無檢附建築 圖說相關資料,亦無其他單位會同勘察資料。該府 建設處、消防局、城市暨觀光發展處如能相互協調 互相勾稽,可避免此事件發生重大傷亡情形等內 容,此有內政部災調報告足資印證。 (八)綜上,彰化喬友大樓為30年屋齡建物,其所有權人 或使用人應維護建築物合法使用及防火避難設施 完善,確保公共安全無虞,然喬友大樓已是第4度 發生火警,此次大火讓火神再度掉眼淚。據彰化縣 政府火災搶救報告及行政調查報告,均指出該建築 物未合法使用、防火避難設施未妥善維護致防火區 劃失效,造成本案救災過程中火煙迅速往上擴大蔓 延,百香果商旅及安全梯間濃煙密布,為本事件致 災原因。然彰化縣政府建設處怠未善盡審慎查核之 責,且據內政部災調報告更指出彰化縣政府於建築 物公共安全檢查申報採行先備查、再排查,整棟大 樓只有1樓遊藝場及6樓至9樓百香果商旅辦理過公 安申報,但建築物有防火及防火避難設施處於失能 狀態等違規情事,肇致未能即時發現建築物公共安 全之隱憂。甚且該府建設處、消防局、城市暨觀光
13 內政部災調報告:依據消防局說明,20時14分第1面(三民路側)因2樓火勢燒穿玻璃帷幕, 20時18分大隊長下令雲梯車射水侷限火勢,通知室內滅火小組撤出,7樓搜救小組就地避難。 但消防局火災搶救報告書動態資料註記20時19分,7樓至9樓防疫旅館住民表示濃煙不斷闖 入。依據消防局提供影像,20時19分鏡頭10的影像中正梯濃煙密布,能見度大幅降低。20時 23分鏡頭6影像中正梯濃煙密布,能見度大幅降低。雲梯車的屋外射水,建築防火及防火避難 設施未能發揮功效,造成不是起火層的旅館及安全梯間濃煙密布,增加陳志帆執行搜救任務 的危險因素,且無法從安全梯撤出的困境。
23
發展處各行其是,未能善盡相互勾稽查核,使業者 變更防火區劃、分間牆、通道、陽台外推等,提出 與消防圖說竣工未盡相符的房間配置仍能通過變 更使用及登記營業,使民眾入住於危及公共安全風 險之防疫旅館。公安申報及抽複查機制的不完善, 造成公共安全的空窗期,致消防員須冒險深入火 場、入室搜救,卻身陷險境而殉職,彰化縣政府確 有怠失。
24
據上論結,彰化縣政府建設處怠未善盡審慎查核之 責,容任喬友大樓內防火避難設施未完善、防火門開啟、 遺失或損壞、大樓內部管道間垂直及水平區劃未落實填 區劃未落實填 塞、閒置空間管理不當、建築內部存放及使用泡棉等易燃 材料裝修,肇致火災發生至火勢成長時,安全梯遭火煙吞 噬形成煙囪效應,阻斷消防人員救災及民眾逃生路徑。該 府建設處、城市暨觀光發展處未善盡審查監督,且資訊橫 向聯繫與勾稽掌握嚴重闕如,致建築物現況與原核准圖說 不一,竟仍能通過變更使用及登記營業。該府消防局於火 災時未能落實災害搶救三層安全管理機制、未能即時獲取 災害現場之建築相關資訊,嚴重影響消防人員入室救援及 撤離,終釀成本事件人民傷亡及消防員殉職,彰化縣政府 跨機關協調不周及監督不力,核有怠失,爰依監察法第24 條提案糾正,移送行政院轉飭所屬確實檢討改善並依法 妥處見復。
提案委員:葉大華 浦忠成
中 華 民 國 1 1 1 年 7 月 1 9 日
FD06183 | 2021_台湾_彰化乔友大楼火警_监察院调查报告.pdf
分类:06_境外及港澳台调查报告 | 年份:2021 | 地域:台湾 | 严重程度: | 场所: | 起火原因:燃气/爆炸 | 来源格式:pdf
1
調 查 報 告
壹、案 由:110年6月30日彰化喬友大樓火警,造成4人死 亡,其中一名為陳姓消防員不幸殉職。據訴, 陳員受困時已使用無線電呼救,且安全官也 知道有隊員受困,陳員仍受困達6小時,直至 火警將結束時才發現陳員單獨於旅館房內浴 室已窒息死亡,然消防官員說「火災突變, 消防人員上不去」;另有相關報載指出火勢控 制後清點消防人員人數始發現陳員未出現, 再進入火場逐層搜尋,究竟現場搶救過程為 何?消防安全官制度、兩人一組搶救規定、 指揮系統是否失靈?陳情人亦指出彰化消防 局人力全國排名最低,消防人力、預算、設 備是否符合第一線消防基層的需要?喬友大 樓此次是第4度發生火警,相關消防安檢制度 是否有確實落實?消防員工作具高度危險及 高壓,消防制度改善須納入第一線基層聲音 納入第一線基層聲音 才能保障基層工作安全,目前消防員發言及 參與管道為何?是否應建立制度性的溝通管 道,開放消防員組織工會?均有深入調查之 必要案。 貳、調查意見: 民國(下同)110年6月30日彰化縣喬友大樓(或稱 喬友商業大樓)火警,始於同日19時48分彰化縣消防局 救災救護指揮中心接獲派出所轉報:「三民路百香果防疫 旅館那間大樓1樓那邊冒煙……」,陸續派遣各式消防救 災車輛75輛、消防人員184人次投入救災。歷經8小時47 分(從民眾報案至火勢撲滅)救災時間,共計疏散及救 出民眾31人,然仍不幸造成東區消防分隊隊員陳志帆殉
2
職,另1名消防隊員受傷及民眾3名死亡、21名受傷之重 大憾事。 案經調閱彰化縣政府、內政部消防署(下稱消防 署)、勞動部等機關卷證資料,並函請臺灣彰化地方檢察 署(下稱彰化地檢署)於本案偵結後提供偵查卷證 1。嗣 於110年10月6日偕同專家學者實地履勘並聽取彰化縣政 府、消防署簡報。彰化縣政府於110年11月3日提出「彰 化縣喬友大樓火災事件」行政調查報告後,本調查案再 於110年12月22日詢問彰化縣政府及所屬建設處、城市暨 觀光發展處、消防局,以及內政部營建署(下稱營建署)、 消防署等機關人員。 復因有消防人員殉職,涉及消防法第27條之1 2規 定,中央主管機關應組成災害事故調查會(下稱內政部 災調會),並製作事故原因調查報告,提出災害搶救改善 建議事項及追蹤改善建議事項之執行。爰內政部於本案 發生後即組成災調會 3,並於111年5月2日審議通過「彰 化縣原喬友百貨舊大樓火災消防人員殉職事故原因調查 報告 4」(下稱內政部災調報告)。據各相關機關函復、履 勘、詢問前、後提供卷證、相關行政調查報告及內政部 災調報告等資料 5,已調查竣事,茲臚列調查意見如下:
1彰化地檢署於110年1月6日彰檢秀荒110偵7706字第1119000581號函送檢察官起訴書(110年 11月30日110年度偵字第7706、11227號)、不起訴處分書(110年度偵字第7706、8668、11227 號)。 2消防法第27條之1規定:「中央主管機關為調查消防及義勇消防人員因災害搶救致發生死亡或 重傷事故之原因,應聘請相關機關(構)、團體代表、學者專家及基層消防團體代表,組成災 害事故調查會。調查會應製作事故原因調查報告,提出災害搶救改善建議事項及追蹤改善建 議事項之執行。」 3召集人:陳次長宗彥,副召集人:消防署謝副署長景旭,委員:謝榮堂、盧家惠、林謙哲、 陳崇賢、林宜君、楊欣潔、洪肇嘉、吳鴻鈞、蕭雅文、李宗吾、欒中丕。 4內政部災調報告以災調會的任務是在找出「消防員及義勇消防人員因災害搶救致發生死亡或 重傷事故之原因」,而非「災害發生原因」。調查報告的改善建議是期望未來在相同的情境下 不再發生消防員及義勇消防人員死亡或重傷的結果,而非防止災害發生。 5彰化縣政府110年9月11日府授消救字第1100297884號、110年9月27日府授消救字第11003365 27號、110年11月5日府授消救字第1100388623號、110年12月21日府授消救字第1100459833 號、消防署110年10月5日消署救字第1100600346號、內政部111年1月4日內授營建管第11108 00164號、勞動部110年9月3日勞動關1字第1100127982號等函及其所附佐證文件;各直轄市、
3
一、彰化縣消防局於110年6月30日19時48分獲報該縣百 香果防疫旅館所在之喬友大樓發生火警,自民眾報案 至火勢撲滅歷經8小時47分救災時間,共計疏散及救 出民眾31人,惟仍造成該局東區消防分隊隊員殉職, 另1名消防隊員受傷及3名住民死亡、21名受傷之重大 憾事。本案起火原因為2樓西北側手扶梯下方疑似因 菸蒂引起火災,復因百香果商旅負責人等3人,於火 警發生時關閉授信總機、未將逃生梯防火門關閉致未 能阻絕火災濃煙、未掌握黃金逃生時間即時廣播通報 及疏散住客等不當作為,經彰化地檢署檢察官以過失 致死罪提起公訴。然對於火勢快速蔓延擴大致消防員 殉職及人員傷亡,係肇因於該大樓防火避難設施未完 善、防火門開啟、遺失或損壞、大樓內部管道間垂直 及水平區劃未落實填塞 區劃未落實填塞、閒置空間管理不當、建築內 部存放及使用泡棉等易燃材料裝修,致火勢成長時, 安全梯遭火煙吞噬形成煙囪效應,阻斷消防人員救災 及民眾逃生路徑。而該府建設處、城市暨觀光發展處 未善盡審查監督,且資訊橫向聯繫與勾稽掌握嚴重闕 如,致建築物現況與原核准圖說不一,竟仍能通過變 更使用及登記營業。另消防局於火災時未能落實災害 搶救三層安全管理機制、未能即時獲取災害現場之建 築相關資訊,嚴重影響消防人員入室救援及撤離,終 釀成本事件人民傷亡及消防員殉職憾事。彰化縣政府 跨機關協調不周及監督不力,核有怠失。 (一)喬友大樓建築係78年10月21日取得(78)彰工管(建) 字第0017588號建造執照、81年1月17日取得(80) 彰工管(使)字第022109號使用執照,本案發生時 營業樓層為1樓為B1類遊藝場(因疫情未營業)及6
縣市政府對於轄內複合式大樓內部分樓層閒置未使用執行建築物公共安全檢查、消防安全設 備檢修申報等情復函。
4
至9樓為B4類旅館使用,其餘樓層為閒置或廢棄空 空,如圖1所示。百香果商旅計有2處出口,一處面 彰化市中正路(南側),另一處面彰化市三民路(北 側),2處出口均設置逃生梯(旅館上下4樓層共有8 個防火門)直通地面,惟中正路側之電梯2座已毀 損而封閉,另三民路側之電梯3座,其中客梯1座及 貨梯各1座則均可正常運作,且2處出口之逃生梯在 各樓層均有通道相通,若有火警發生,在確認旅館 所在之樓層尚無火勢,且經由監視器確認煙霧是在 樓下,而煙霧狀況尚不嚴重時,房客(即住民)可 經由電梯之方式快速疏散,若對電梯狀況有所疑 慮,亦可經由2側之逃生梯盡速撤離至地面 6。
資料來源:彰化縣政府簡報。 圖1 喬友大樓各樓層用途、使用狀況 (二)據彰化縣政府查復、彰化縣消防局火災搶救報告書
6 彰化地檢署檢察官起訴書110年度偵字第7706、11227號。
5
及「彰化縣喬友大樓火災事件」行政調查報告, 本案起火戶為喬友大樓(彰化縣彰化市三民路○○ 號、彰化市中正路一段○○○號)2樓,起火處位 於該址2樓西北側手扶梯下方附近。火流延燒路徑 研判為火勢從2樓起火處起燃後,經由西北側手扶 梯往1樓、3樓、4樓延燒,造成1樓西北側附近、3 樓整層、4樓北側受火勢燒損,擴大延燒因素為西 北側手扶梯垂直貫穿2、3、4樓,底部貫穿2樓樓地 板,造成1、3、4樓受火勢延燒,火勢控制於4樓, 未向上擴大延燒,本事件百香果商旅有住民之7、 8、9樓層無火流現象。復依本院偕同專家學者實地 履勘指出,於3樓廢棄KTV因原裝潢使用大量泡棉 7為 火勢迅速擴大原因,再依內政部災調報告指出該大 樓管理未完善,閒置空間堆積雜物,本建物2樓至4 樓及10樓以上閒置空間建築內部存放及使用泡棉 等易燃材料裝修,火載量 8甚大,易生治安、縱火、 安全管理之疑慮。本事件搶救時序概要如圖2,火 災搶救時序如附表、火流煙流如附圖所示。
7 PU泡棉係由二異氰酸甲苯與多元醇合成,並加一些矽油,分解後的危險性如下:(一)窒息 性的黑色霧滴:PU泡狀彈性體於240℃分解(不同於閃燃500℃),產生碳、氫、氧、矽、氮、 氯等組成的黑色霧滴,比空氣重,分子量100~400、大小約40微米具黏性的高溫霧滴(陳志帆 罹災房間天花板及較高處均乾淨,黑色霧滴分布在較低處,使人吸入後窒息)。(二)PU泡棉於 火場分解特性:PU泡棉外面有一層裝潢材,所以就算外面裝潢材火焰熄滅,但內部泡狀彈性 體仍化繼續解離持黑色霧滴,至全部分解才結束。(三)爆燃性:PU泡棉分解成大量黑色霧滴 後,如裝潢材內部氧氣重新進入,會使火焰重新產生,導致產生爆燃現象(類似蒸氣雲爆炸) 。 8 火載量為代表建築物或防火區劃內所有可燃物於完全燃燒時所釋放出熱能的總數,一般定 義為單位樓地板面積之可燃性物質的熱含量,或密閉空間中可燃性物質的總熱含量,則此時 稱每單位面積之火載量為火載量密度。資料來源:可燃物火載量先期評估技術建立與應用, 內政部建築研究所自行研究報告,94年12月。
6
資料來源:彰化縣政府簡報。 圖2 本事件火災搶救時序概要 (三)復據彰化縣消防局火災原因調查鑑定書(110年7月 28日)起火原因研判以菸蒂引起火災之可能性較 大。再據彰化地檢署於110年1月6日彰檢秀荒110偵 7706字第1119000581號函送檢察官起訴書 9(110年 度偵字第7706、11227號),以過失致死將喬友大樓 6至9樓供防疫旅館使用之百香果商旅負責人蔡○ ○、管理員吳○○、會計業務人員沈○○提起公 訴,內容如下: 1、110年6月30日19時30分許至19時45分許,喬友商 業大樓 2樓西北 側手扶梯下方附近, 側手扶梯下方附近,疑似因菸蒂 而引起火災,旋於同日19時47分18秒許(上開旅
9另彰化地檢署檢察官不起訴處分書(110年度偵字第7706、8668、11227號),蔡○○過失傷害 案件業成調(和)解,應為不起訴處分。
7
館8樓 消防廣播器位置監視錄影顯示之時間 消防廣播器位置監視錄影顯示之時間),設 置於該旅館 8樓 之火災警報器響起,並自動發出 之火災警報器響起,並自動發出 電子聲音提醒房客逃生避難,蔡○○、吳○○及 沈○○均明知依旅 館業管理規則第 規則第25條規定,遇 有火災、天然災害或緊急事故發生,對住宿旅客 客 生命、身體有重大危害時,應即通報有關單位、 疏散旅客,並協助傷患就醫,且渠等亦曾就上開 客,並協助傷患就醫,且渠等亦曾就上開 事項進行演練,及 演練,及蔡○○、吳○○均知遇有火災 時,應注意 旅館防火門是否確實關閉,以發揮防 防火門是否確實關閉,以發揮防 火門阻絕或延緩濃煙竄入之作用,爭取人命救助 時間,而又無不能注意之情事, 能注意之情事,蔡○○、吳○○ 及沈○○竟均疏未注意,蔡○○僅往上勘查旅館 7、8、9樓 未發現火災後,便在 未發現火災後,便在8樓 授信總機以擴 授信總機以擴 音告知 旅館內所有人員,表示「消防測試中,勿 內所有人員,表示「消防測試中,勿 慌張」等語,並將授信總機電源關閉,使授信總 機無法繼續發出巨大警示聲響,致房客誤以為警 報已經解除,且蔡○○與吳○○為便於巡查,竟 將旅館 8樓 及 及7樓靠三民路 側之逃生梯防火門分 側之逃生梯防火門分 別以大型塑膠桶及滅火器擋住,而於離開時疏未 開時疏未 將該樓阻絕火災濃煙之前開逃生梯 阻絕火災濃煙之前開逃生梯防火門關上。 2、嗣蔡○○又前往6樓 勘查,發現天花板已經出現 勘查,發現天花板已經出現 煙霧,空氣中也聞到火燒的味道,約此同時,沈 ○○透過櫃臺監視器亦已發現喬友大樓 1樓 已有 已有 些微煙霧,詎蔡○○、沈○○在確認大樓已經發 已經發 生火警後,竟未再次向 旅館房客廣播警示,使住 房客廣播警示,使住 宿旅客得以在第一時間掌握正確訊息即時疏 客得以在第一時間掌握正確訊息即時疏 散,亦未為其他疏散旅客措施,且任由 客措施,且任由8樓 及 及7樓 之防火門開啟著,其2人即各拿1個滅火器欲搭乘 電梯下樓,同一時間,因聽聞警報聲 而自行跑出 跑出 隔離區之房客 區之房客曾○○父子2人(均未成傷)詢問沈
8
○○是要往樓上還是要往樓下跑 ,後來其 其2人跑 至7樓 處,而與 處,而與沈○○及蔡○○一起下樓,待抵 ,待抵 達1樓發現樓 下確有火警後, 下確有火警後,蔡○○並未趕緊返 回旅館救助、疏散旅客,復未在火勢尚未失控之 未在火勢尚未失控之 時,通知人尚在櫃臺之吳○○轉知房客趕緊利用 電梯或逃生梯疏散,僅沈○○1人返回旅館 7樓 , , 然沈○○返回7樓 後,僅在 後,僅在7樓 靠近櫃臺側之走道 靠近櫃臺側之走道 (按該 旅館之走道係呈長方型,以走道為劃分, 之走道係呈長方型,以走道為劃分, 部分客房係位於各該樓層之外側,部分客房則係 層之外側,部分客房則係 位於各該樓層之中間部分 層之中間部分)向房客大喊「你們先 留在房間內,現在消防人員 來處理了,你們不要 要 開門,不要讓煙跑進去」等語 要讓煙跑進去」等語,而與吳○○均疏 未於濃煙竄升上來前及時對房 客進行疏散,復疏 疏 未掌握黃金逃生時間及時前往 逃生時間及時前往8樓 授 授信總機處再 向房客進行廣播,或以旅館分機或手 機電話聯絡 絡 等方式,告知房客正確之火災訊息,俾房客得以 判斷是否自行逃生避難 逃生避難。嗣因蔡○○、吳○○及 沈○○未於火災發生時採取疏散旅客措施, 客措施,復擅 行 將授信總機電源關閉,致房客誤以為警報已經 將授信總機電源關閉,致房客誤以為警報已經 解除,而錯失逃生時機,蔡○○、吳○○復 疏未 疏未 將8樓 、 、7樓 防火門關閉,加快濃煙竄往 防火門關閉,加快濃煙竄往8樓 及 及9 樓,且沈○○返回旅館後,復未再次向房客進行 廣播或以其他方式通知房客 旅館所在之大樓發 發 生火警之訊息,且未及時疏散房客傷亡。 3、因蔡○○、吳○○及沈○○上開疏失,致使消防 隊員陳志帆等人必須入室救援搜索受困之眾多 入室救援搜索受困之眾多 房客,嗣消防隊員陳志帆因受困民眾人數過多救 過多救 援作業秏時致氣瓶 行將用盡而不得不進入沒有 進入沒有 對外開窗之客房內避難,嗣因吸入過多一氧化碳 中毒,經搶救無效而殉職。
9
(四)本院實地赴喬友大樓履勘及聽取簡報,對於本案殉 職消防人員受困及其救援過程達近6小時,彰化縣 政府查復係受下列救災阻礙因素影響: 1、本案現場2、3、4樓為閒置未加管理的大樓建築, 防火避難設施未臻完善,防火門開啟、遺失或損 壞,大樓內部管道間垂直區劃、水平區劃未落實 區劃未落實 填塞,使現場消防人員及民眾於火災報案後30分 鐘內即遭遇大量濃煙,阻礙救援動線,增加救援 的困難與危險。 2、現場2至4樓內部電扶梯,造成火煙延燒路徑,且 內部使用易燃材料裝修,造成火勢迅速擴大燃 燒,增加侷限火勢的困難度。 3、火勢成長下,2座安全梯均被火煙吞噬,形成煙 囪效應,阻斷消防人員入室救災及民眾避難逃生 的路徑,僅可倚靠雲梯車執行高空作業,導致救 災效率緩慢。 (五)經查,喬友大樓6至9樓為百香果商旅作防疫旅館使 用,商業旅館及防疫旅館皆屬「各類場所消防安全 設備設置標準」(下稱設置標準)第12條第1款第3目 之「旅館」用途分類,屬甲類場所,其消防安全設 備均依設置標準第14條至第192條之1逐條檢討設 置,並無差異。本案火災因百香果商旅負責人等因 其不當作為已遭彰化地檢署檢察官提起公訴,然對 於火勢快速蔓延擴致消防員殉職及人民傷亡,肇因 於該大樓防火避難設施未完善、閒置空間管理不 當、該府相關機關協調未盡周全,致建築物現況與 原核准圖說不一卻仍能通過變更使用及登記營業 等情,再有於火災時之災害搶救安全管理機制未落 實、災害現場獲取之建築相關資訊有限,均嚴重影 響消防人員救援及撤離,此有彰化縣消防局火災搶
10
救報告書及該府行政調查報告載明:「大樓建築防 火避難設施未臻完善」、「現場2至4樓內部手扶梯, 造成火煙延燒路徑,內部易燃材料裝修,造成火勢 迅速擴大燃燒」、「未落實三層安全管理機制」等, 內政部災調報告指出本案致消防員殉職之次要成 因 10略以:「建築物垂直防火區劃失效」、「所有權人 或使用人未維護建築物之合法使用」、「公安申報縣 政府先備查、再排查,未能即時發現建築物公共安 全之隱憂」、「縣政府相關機關協調未盡周全,致建 築物現況與原核准圖說不一仍能通過變更使用及 登記營業,衍生危害」、「未落實隊員、帶隊官及指 揮官之三層安全管理機制」、「災害現場獲取之建築 相關資訊有限,影響消防人員救援及撤離」等內容 可稽,彰化縣政府為地方主管建築機關、主管地方 觀光事務及消防主管機關,跨機關協調不周及監督 不力,難辭其咎。又於本事件後該府消防局已就相 關人員進行懲處 11,然該府建設處、城市暨觀光發 展處卻遲未議處相關失職人員,確有未當。 (六)另內政部災調報告亦指出,本次火災消防局於派遣 時已知為防疫旅館,雖有調派10輛防疫救護車及4 輛一般型救護車執行現場後送勤務,並於21時05分 啟動大量傷病患機制,惟並未調動衛生量能救護 車,現場亦未設置大量傷病患集結區進行傷患處置 及後送等情。此案對象為隔離檢疫人員,疏散此類
10 指該成因雖無法直接導致事故發生,但其存在具相當高的程度(風險)有促使、加速或有 助事故發生。 11 彰化縣政府110年11月3日「彰化縣喬友大樓火災事件」行政調查報告,代理局長自行請辭 代理局長職務以負起指揮督導不周之行政責任,另依彰化縣消防局提供該局人員懲處情形,( 一)彰化東區分隊劉小隊長,110年6月30日彰化市喬友大樓火災搶救案件,於火場單獨脫隊, 且未將脫隊情形通知指揮官,記過1次。(二)彰化東區分隊蕭小隊長,110年6月30日彰化市喬 友大樓火災搶救案件,因故於火場中變更任務,變更前未獲指揮官同意,申誡1次。(三)第一 大隊劉大隊長,110年6月30日彰化市喬友大樓火災搶救案件,對屬員工作違失督導不週,申 誡1次。
11
大量傷病患主要涉及衛生體系之大量傷患處置、交 通主管單位之防疫旅館管理、消防單位之防火管理 等,惟各機關雖有各自有主管法規規定,尚需加強 機關間之橫向聯繫機制,故建議規劃建置防疫旅館 火災疏散大量傷病患現場之集結、檢傷、管制、後 送等處置機制。 (七)綜上,彰化縣消防局於110年6月30日19時48分獲報 該縣百香果防疫旅館所在之喬友大樓發生火警,自 民眾報案至火勢撲滅歷經8小時47分救災時間,共 計疏散及救出民眾31人,惟仍造成該局東區消防分 隊隊員殉職,另1名消防隊員受傷及3名住民死亡、 21名受傷之重大憾事。本案起火原因為2樓西北側 手扶梯下方疑似因菸蒂引起火災,復因百香果商旅 負責人等3人,於火警發生時關閉授信總機、未將 逃生梯防火門關閉致未能阻絕火災濃煙、未掌握黃 金逃生時間即時廣播通報及疏散住客等不當作 為,經彰化地檢署檢察官以過失致死罪提起公訴。 然對於火勢快速蔓延擴大致消防員殉職及人員傷 亡,係肇因於該大樓防火避難設施未完善、防火門 開啟、遺失或損壞、大樓內部管道間垂直及水平區 區 劃未落實填塞、閒置空間管理不當、建築內部存放 及使用泡棉等易燃材料裝修,致火勢成長時,安全 梯遭火煙吞噬形成煙囪效應,阻斷消防人員救災及 民眾逃生路徑。而該府建設處、城市暨觀光發展處 未善盡審查監督,且資訊橫向聯繫與勾稽掌握嚴重 闕如,致建築物現況與原核准圖說不一,竟仍能通 過變更使用及登記營業。另消防局於火災時未能落 實災害搶救三層安全管理機制、未能即時獲取災害 現場之建築相關資訊,嚴重影響消防人員入室救援 及撤離,終釀成本事件人民傷亡及消防員殉職憾
12
事。彰化縣政府跨機關協調不周及監督不力,核有 怠失。
二、彰化喬友大樓為30年屋齡建物,其所有權人或使用人 應維護建築物合法使用及防火避難設施完善,確保公 共安全無虞,然喬友大樓已是第4度發生火警,此次 大火讓火神再度掉眼淚。據彰化縣政府火災搶救報告 及行政調查報告,均指出該建築物未合法使用、防火 避難設施未妥善維護致防火區劃失效,造成本案救災 過程中火煙迅速往上擴大蔓延,百香果商旅及安全梯 間濃煙密布,為本事件致災原因。然彰化縣政府建設 處怠未善盡審慎查核之責,且據內政部災調報告更指 出彰化縣政府於建築物公共安全檢查申報採行先備 查、再排查,整棟大樓只有1樓遊藝場及6樓至9樓百 香果商旅辦理過公安申報,但建築物有防火及防火避 難設施處於失能狀態等違規情事,肇致未能即時發現 建築物公共安全之隱憂。甚且該府建設處、消防局、 城市暨觀光發展處各行其是,未能善盡相互勾稽查 核,使業者變更防火區劃、分間牆、通道、陽台外推 等,提出與消防圖說竣工未盡相符的房間配置仍能通 過變更使用及登記營業,使民眾入住於危及公共安全 風險之防疫旅館。公安申報及抽複查機制的不完善, 造成公共安全的空窗期,致消防員須冒險深入火場、 冒險深入火場、 入室搜救,卻身陷險境而殉職,彰化縣政府確有怠失。 (一)按建築法第77條第1項規定,建築物所有權人、使用 人應維護建築物之合法使用與其構造及設備之安 全。同法第77條第4項規定,主管建築機關對建築 物公安檢查簽證結果,得隨時派員或定期會同各有 關機關複查,場所抽查比率。次按彰化縣建築物公 共安全檢查申報案件複查執行要點第6點規定為建
13
築物公共安全檢查申報複查率應達35%以上。 (二)彰化縣政府查復,喬友大樓有營業樓層為一樓為B1 遊藝場使用及6至9樓為B4旅館使用,上開營業場所 均依上該規定申報公安在案;其中一樓「新鑫馬電 子遊戲場業」109年度依規申報合格備查,並於110 年3月25日由該府委託社團法人彰化縣建築師公會 辦理複查,結果為合格。110年度申報因疫情原因, 依內政部110 年5 月19 日內授營建管字第 1100808203號函示得展延至本年度第3季前(9月底 前)辦理;另6至9樓「百香果商旅」業已委託專業 檢查人於110年3月26日至110年4月26日就「防火避 難設施」及「設備安全」項目檢查合格。然喬友大 樓於110年7月14日配合內政部災調會現場勘查,有 下列未符圖說之情形: 1、2至4樓:排煙室已不存在,與原竣工圖說不符。 2、7至9樓: (1)8、9樓建築圖面之空調機房及儲藏室實際作為 客房使用。 (2)9樓排煙室內增建廁所及原自行增設房間拆除 中。 (3)三民路側安全梯9樓往10樓間以木板隔間阻礙 通行。 (三)經查,彰化縣消防局火災搶救報告書檢討指出「現 場救災阻礙因素」如下: 1、大樓建築防火避難設施未臻完善,現場2、3、4 樓為閒置空間,防火門開啟或遺失,9樓防火門 火災後遭民眾開啟,內部管道間垂直區劃、水平 區劃未落實填塞,使大量濃煙迅速竄出向上並流 入旅館內部,造成現場消防人員及民眾於火災報 案後30分鐘內,即遭遇大量濃煙。
14
PU泡棉易燃材料裝修,造成火勢迅速擴大燃燒, 增加侷限火勢的困難度。 3、火勢迅速成長,大樓2座安全梯均被火煙吞噬, 形成煙囪效應,阻斷消防人員入室救災及民眾避 難逃生的路徑,僅可倚靠雲梯車執行高空作業, 導致救災效率緩慢。 (四)再查,彰化縣政府行政調查報告指出,該府建設處 針對建管缺失部分,在變更使用執照、建築物公共 安全檢查申報,以及管理委員會和所有權人,應各 有其責,如下: 1、管理委員會管理部分:未善盡管理責任,擅自封 閉9、10樓安全梯且未維護安全梯之完整防火區 劃。 2、所有權人未依法使用部分:按建築法第77條第1 項規定,建築物所有權人、使用人應維護建築物 之合法使用,以及構造及設備之安全。 (1)2至4樓所有權人未善盡維護責任,致建築物防 火門及防火區劃破壞。 (2)7至9樓所有權人擅自變更使用陽台外推。 3、變更使用執照部分:部分管道間防火填塞不全, 監造人及施工廠商未善盡督工責任。 4、建築物公共安全檢查申報部分: (1)營業場所停止營業部分:營業所依現況認定為 停止營業者,免辦理建築物公共安全檢查申 報。本案喬友大樓2、3、4樓閒置情形依規定 免辦理建築物公共安全檢查。 (2)喬友大樓7、8、9樓部分:建築物公共安全檢 查人申報不實,未依法落實檢查申報並意圖使 公務員登載不實。
15
(五)另據彰化縣政府就百香果商旅(防疫旅館)管理查 復,該府城市暨觀光發展處依交通部觀光局99年12 月3日觀賓字第0990600658號函所示,對於合法旅 宿業每年稽查1次。 百香果商旅為彰化縣合法旅 館,原排訂於110年8月份進行聯合稽查作業,另防 疫旅館部分就衛生福利部所發布因應 部所發布因應COVID-19疫 情防疫旅宿檢核表進行檢核作業。喬友大樓於110 年6月30日火災發生後,該處確認當日住客之客 房,經查有非屬合法核准之客房,有擴大營業客房 事實,該府即依法裁處並命其擴大部分勒令歇業 12。該府城市暨觀光發展處表示依據「旅館管理規 則」第29條規定,僅掌握旅宿業之房間配置圖,另 旅館之建築管理與防火避難設施及防空避難設 備、消防安全設備、營業衛生、安全防護,由各有 關機關逕依主管法令實施檢查。依旅館業管理規則 第10條第2項規定:「地方主管機關受理申請旅館業 登記案件,必要時,得邀集建築及消防等相關權責 單位共同實地勘查」,旅館文件申請無規定須會辦 會辦 建築及消防等相關權責單位;然目前作業流程皆會 辦相關權責單位等云云。 (六)惟據內政部災調報告揭示,喬友大樓有「建築物垂 直防火區劃失效」、「所有權人或使用人未維護建築 物之合法使用」、「公安申報縣政府先備查、再排 查,未能即時發現建築物公共安全之隱憂」、「縣政 府相關機關協調未盡周全,致建築物現況與原核准 圖說不一仍能通過變更使用及登記營業,衍生危
12 發展觀光條例第55條第7項:「觀光旅館業、旅館業及民宿經營者,擅自擴大營業客房部分 者,其擴大部分,觀光旅館業及旅館業處新臺幣5萬元以上25萬元以下罰鍰。擴大部分並勒令 歇業。」
16
害」等情事,為造成本案消防人員殉職之次要成 因,分述如下: 1、建築物垂直防火區劃失效: (1)建築物在三民路側及中正路側各有1座安全 梯,三民路側安全梯、電梯及管道間鄰近起火 處。因1樓至4樓2座安全梯之防火門未關閉(或 無防火門),加上百香果商旅客梯停於2樓且梯 門開啟,又管道間維修口未設門敞開,破壞垂 直防火區劃,煙熱由安全梯、電梯及管道間向 上蔓延(如圖3)。 (2)現場另發現,9樓百香果商旅中正路側安全梯之 常閉式防火門為開啟狀態,三民路側安全梯9 樓往10樓間設有木門阻擋,造成熱煙累積下 沉,致大量濃煙由該防火門進入百香果旅館之9 樓空間(如圖4)。
17
(左)2樓B梯防火門未關閉,外觀呈北低南高煙燻痕跡。 (右)2樓A梯呈開啟狀態,外觀無明顯煙燻情形。 資料來源:內政部災調報告,僅以2樓防火門為例。 圖3 本事件建築物垂直防火區劃失效佐證照片
(左)一般旅客使用之電梯停於2樓且呈開啟狀態。 (右)2樓B梯旁管道間未封閉。
18
資料來源:內政部災調報告。 圖4 本事件建築物9樓B梯間往10樓設有木門阻擋佐證照片
築物2樓至4樓防火門及防火區劃遭破壞、且有排 煙室損毀之情形;又彰化縣政府調查7樓至9樓所 有權人違規變更使用陽台外推,8樓至9樓空調機 房及儲藏室遭百香果商旅違規變更為客房使 用,9樓排煙室內遭百香果商旅違規增建廁所及 增設房間,以陳志帆最後避難的9627房為例,在 消防局竣工圖是供儲藏室使用,但業者卻變為房 間使用,並經現場勘查時發現建築區劃(垂直及 水平區劃,如管道間及天花板等 區劃,如管道間及天花板等)防火填塞不確 實(如圖5、圖6)。業主放任該場所違法使用, 致火災發生時造成嚴重傷亡。
19
(左)浴室排風管連接至塑膠管,開口貫穿至走道天花板上方。 (右)天花板上方東南側配置情形,天花板上方與樓地板、橫樑底 部有間隙。 資料來源:內政部災調報告(摘列)。 圖5 本事件殉職消防員所在房間管道間及天花板間隙佐證照片 (左)房間門北段外側與地板約有1.1公分縫隙。 (右)房間門中段外側與地板約有1公分縫隙。 資料來源:內政部災調報告(摘列)。 圖6 本事件殉職消防員所在房間門與地板縫隙佐證照片
20
建築物公共安全之隱憂:整棟大樓只有1樓遊藝 場及6樓至9樓百香果商旅辦理過公安申報,但建 築物有多處違規等情事,公安申報書未提報或勾 列免申報項目,致未發現建築物防火及防火避難 設施處於失能狀態。百香果商旅屬於110年3月26 日至110年4月26日就「防火避難設施」及「設備 安全」項目業委託專業檢查人檢查合格,並於110 年5月19日予以備查,爰尚未納入抽複查場所, 即於6月30日發生火災。公安申報及抽複查機制 的不完善,造成公共安全的空窗期,促使本案事 故發生。 4、縣政府相關機關協調未盡周全,致建築物現況與 原核准圖說不一仍能通過變更使用及登記營 業,衍生危害: (1)本案建築物申請第6次變更使用將8、9樓變更為 旅館使用,108年1月24日建設處審查建築物變 更使用執照圖、108年5月27日消防局審查建築 物消防安全設備設計圖與108年10月1日消防局 審查建築物消防安全設備竣工圖之圖說隔間9 樓均為10間,108年12月27日建設處審查建築物 變更使用執照併案辦理室內裝修所附文件9樓 竣工圖隔間數為17間,109年2月26日城市暨觀 光發展處審查准予設立登記所檢附文件照片9 樓房間數為23間,百香果商旅110年上半年度消 防安全檢修申報之平面圖 面圖9樓依實際使用情形 所劃設隔間數為25間;亦即該場所申請辦理變 更使用併室內裝修時,申請審查建築圖說隔間 數,顯與建築竣工圖隔間數未盡相符。 (2)建設處為民眾申請辦理變更使用之主責機關,
21
應告知民眾須經相關權管機關查驗符合相關規 經相關權管機關查驗符合相關規 範,建設處同時也是最後審查准予變更使用之 機關,民眾明顯由原辦理變更使用所檢附建築 圖說10間,至辦理建築竣工圖審查,隔間由拆 除分間牆及占用原規劃走廊而增加至17間,參 照該縣建設處受訪人員意見,應辦理變更設 計,惟未依規定辦理。爰此,建管單位於變更 程序當中尚待改善,以建立相關審查作業把關 機制,符合建築相關法令等意旨,以達保障民 眾生命財產安全。 (3)除9627外,另9618、9628房在建設處竣工圖上 也是供機房使用,之後民眾再於申請旅館登記 時,由申請變更使用併室內裝修竣工圖房間數 17間,再增加為城市暨觀光發展處准予文件之 照片合計23間,城市暨觀光發展處雖有派員會 勘(未會同建設處及消防局)卻未發現,因機關 間的協調未臻周全,造成建築管理的漏洞,未 按圖施工、使用致使防火、防火避難設施有缺 陷的場所仍能取得證照違規營業。 (七)因此,建築法第1條揭示立法目的為維護公共安全, 是建築物所有權人、使用人應維護建築物之合法使 用與其構造及設備之安全至為明確,然地方政府主 管建築機關對建築物公安檢查簽證結果,得隨時派 員或定期會同各有關機關複查,藉以維護建築物公 共安全。彰化縣政府建設處為主管建築機關,維護 建築物公共安全檢查責無旁貸,而本案救災過程, 消防局救火指揮官下令採行雲梯車射水滅火,卻因 建築防火及防火避難設施未能發揮功效,造成火煙 迅速往上擴大蔓延,百香果商旅及安全梯間濃煙密 布,肇致本案殉職消防員陳志帆陷入險境且無退路
22
據「旅館管理規則」第29條規定僅掌握旅宿業之房 間配置圖。然業者變更防火區劃、分間牆、通道、 陽台外推等,提出與消防圖說竣工未盡相符的房間 配置仍能取得設立登記。百香果商旅申請時依規定 應檢附建築物核准使用證明文件,本案無檢附建築 圖說相關資料,亦無其他單位會同勘察資料。該府 建設處、消防局、城市暨觀光發展處如能相互協調 互相勾稽,可避免此事件發生重大傷亡情形等內 容,此有內政部災調報告足資印證。 (八)綜上,彰化喬友大樓為30年屋齡建物,其所有權人 或使用人應維護建築物合法使用及防火避難設施 完善,確保公共安全無虞,然喬友大樓已是第4度 發生火警,此次大火讓火神再度掉眼淚。據彰化縣 政府火災搶救報告及行政調查報告,均指出該建築 物未合法使用、防火避難設施未妥善維護致防火區 劃失效,造成本案救災過程中火煙迅速往上擴大蔓 延,百香果商旅及安全梯間濃煙密布,為本事件致 災原因。然彰化縣政府建設處怠未善盡審慎查核之 責,且據內政部災調報告更指出彰化縣政府於建築 物公共安全檢查申報採行先備查、再排查,整棟大 樓只有1樓遊藝場及6樓至9樓百香果商旅辦理過公 安申報,但建築物有防火及防火避難設施處於失能 狀態等違規情事,肇致未能即時發現建築物公共安 全之隱憂。甚且該府建設處、消防局、城市暨觀光
13 內政部災調報告:依據消防局說明,20時14分第1面(三民路側)因2樓火勢燒穿玻璃帷幕 ,20時18分大隊長下令雲梯車射水侷限火勢,通知室內滅火小組撤出,7樓搜救小組就地避難 。但消防局火災搶救報告書動態資料註記20時19分,7樓至9樓防疫旅館住民表示濃煙不斷闖 入。依據消防局提供影像,20時19分鏡頭10的影像中正梯濃煙密布,能見度大幅降低。20時 23分鏡頭6影像中正梯濃煙密布,能見度大幅降低。雲梯車的屋外射水,建築防火及防火避難 設施未能發揮功效,造成不是起火層的旅館及安全梯間濃煙密布,增加陳志帆執行搜救任務 的危險因素,且無法從安全梯撤出的困境。
23
發展處各行其是,未能善盡相互勾稽查核,使業者 變更防火區劃、分間牆、通道、陽台外推等,提出 與消防圖說竣工未盡相符的房間配置仍能通過變 更使用及登記營業,使民眾入住於危及公共安全風 險之防疫旅館。公安申報及抽複查機制的不完善, 造成公共安全的空窗期,致消防員須冒險深入火 冒險深入火 場、入室搜救,卻身陷險境而殉職,彰化縣政府確 有怠失。
三、火場指揮官、救火指揮官分別職司統一指揮火場救 災、警戒、救火偵查等勤務,以及負責指揮人命救助 及火災搶救部署任務,指揮官應掌握火場資訊以作為 火災搶救部署之依據。然彰化縣消防局於喬友大樓火 場執行救災任務,未落實隊員、帶隊官及指揮官之三 層安全管理機制,有第一大隊東區分隊小隊長單獨脫 隊、安全幕僚未及時通知入室人員撤出、輪替小組人 員擅自變更任務等疏失。甚且於斯時因停電致無法從 業者處取得百香果商旅之平面圖說, 面圖說,另因2樓電扶梯 被裝潢材料包覆、隱蔽,救災人員亦未能掌握喬友大 樓1至4樓電扶梯構造及防火區劃情形,肇生本事件救 災指揮調度難有依循,亟待檢討改進。 (一)為提升消防機關火場指揮能力,強化火災搶救效 率,發揮整體消防戰力,以確保人民生命財產安 全,消防署訂定「消防機關火場指揮及搶救作業要 點」(下稱火場搶救作業要點),作為各消防機關火 場指揮及搶救依循規範。依火場搶救作業要點第2 點、第3點規定,火場指揮官區分火場總指揮官(由 消防局局長擔任、火場副總指揮官(由消防局副局 長或主任秘書(秘書)擔任;直轄市得由簡任層級 人員擔任)、救火指揮官(依情形由轄區消防大(中)
24
隊長、消防分隊長或救災救護指揮中心指定人員擔 任)。火場總指揮官(副總指揮官)任務包括:1. 成立火場指揮中心。2.統一指揮火場救災、警戒、 偵查等勤務之執行。3.依據授權,執行消防法第31 條「調度、運用政府機關公、民營事業機構消防、 救災、救護人員、車輛、船舶、航空器及裝備,協 助救災」。4.必要時協調臨近之軍、憲、民間團體 或其他有關單位協助救災或維持現場秩序。救火指 揮官任務包括:1.負責指揮人命救助及火災搶救部 署任務。2.劃定火場警戒區。3.建立人員裝備管制 站。4.指揮電力、自來水、瓦斯等相關事業單位, 配合執行救災。5.指揮救護人員執行緊急救護。6. 災情回報及請求支援等事宜。 (二)復依火場搶救作業要點第6點第2項規定,各直轄 市、縣(市)消防機關應訂定隊員、帶隊官及指揮 官等三層安全管理機制,現場各級搶救人員應於救 災安全之前提下,衡酌搶救目的與救災風險後,採 取適當之搶救作為。另該署函發「提升火場救災安 全執行計畫」(下稱火場救災執行計畫)陸、指導 原則,三、火場安全管理要領,(二)幹部或資深 隊員帶班進入火場。火場搶救作業要點第7點火災 搶救作業要領規定包括整備各式搶救資料 14、受理 報案 15、出動派遣 16、出動途中處置、抵達火場處置
14 1.當日人員、車輛救災任務派遣編組表。2.甲、乙種搶救圖(甲種搶救圖:就地圖內相關 街道、建築物位置、樓層高度、水源狀況、消防栓管徑大小、位置及池塘、蓄水池、河川、 湖泊、游泳池位置等可供消防救災車輛出入等相關資料,予以符號標記標示,提供災害搶救 參考;乙種搶救圖:針對轄內搶救不易場所(供公眾使用建築物為主),以會審、勘之消防圖 說繪製,並註記各對象物可供救災運用之消防安全設備、位置、數量及供人命救助、災害搶 救參考之內部設施資訊)。3.搶救不易對象搶救部署計畫圖。4.安全資料表、緊急應變指南等 相關危害性化學品搶救資料。5.建置轄內備有重機械場所(如堆高機、挖土機、吊車等)清 冊。 15 1.救災、救護指揮中心(以下簡稱指揮中心)(或分、小隊值班人員)受理火警報案後,應 持續蒐集火場情資、人員受困情形並立即派遣救災人、車出動及通報義消、友軍(警察、環
25
等 17事項。 (三)據彰化縣政府查復,本案初期指揮官為彰化分隊分 隊長王○○110年6月30日(下同)19時54分到達, 另於19時58分回報現場需要大隊支援,至第一大隊 大隊長劉○○20時05分到達,指揮權轉移。代理局 長邱○○20時55分到達,為火場總指揮官。本案火 場初期發現起火層位於2樓,經現場勘查及百香果 商旅管理權人告知,1樓為電子遊藝場火災前因疫 情關係停業未營業、7樓至9樓百香果商旅為防疫旅 館,樓上有4位員工,23位民眾尚未逃生,其餘樓 層目前未使用,研判起火層(2樓)及其直上層(3 樓)無人員待救。初期指揮官研判現場狀況及人員 回報情形,因室內及梯間有濃煙狀況、7、8、9皆 有住民且人數眾多,貿然集結整隊疏散下樓,民眾 遇到火煙驚慌下,秩序恐難以控制,無法確保行動 安全性,另考量大樓應有相當之防火避難設施,2 樓火煙難以大量竄至7、8、9樓,且新設置旅館各 房間防火門應屬完善,衡量之下,故通報入室查看
保、衛生、電力、自來水、瓦斯等單位)支援配合救災。2.調閱甲、乙種搶救圖、搶救部署 計畫圖或相關搶救應變指南。3.出動時間:(1)於出動警鈴響起至消防人車離隊,白天80秒 內,夜間120秒內為原則。但消防機關因出勤動線及出勤整備,認有延長或縮短之必要者,得 自訂出動時間。(2)出動時間目標達成率須在百分之 在百分之90以上。 16 1.車輛派遣:除特種車(如雲梯車、化學車等)依狀況需要派遣外,車輛派遣應以「車組 」作戰為原則,忌用「車海」戰術。2.人員派遣:依救災任務派遣編組表所排定任務作為, 並配合每一攻擊車應至少能出二線水線為人力考量原則。3.初期救火指揮官應攜火警地址登 錄 資料、甲、乙種搶救圖、搶救部署計畫圖、及其他相關搶救應變指南等資料出動。 資料、甲、乙種搶救圖、搶救部署計畫圖、及其他相關搶救應變指南等資料出動。 17 1.災情回報……2.請求支援……3.指揮權轉移……4.車輛部署……5.水源運用……6.水線 部署……7.人命搜救:自受理報案開始即應以人命搜救為最優先考量。抵達火場後,優先進 行人命搜救任務。(1)第一梯次抵達火場之救災人、車,優先進行人命搜救任務,水源部署 應掩護搜救任務之進行。(2)搜救小組應以兩人以上為一組,以起火層及其直上層為優先搜 救目標,樓梯、走道、窗邊、屋角、陽台、浴廁、電梯間等,應列為搜救重點。(3)由指揮 官分配各搜索小組搜索區域、聯絡信號,入室搜索 前應先登錄管制搜救小組「姓名」、「人數 管制搜救小組「姓名」、「人數 」、「時間」、「氣瓶壓力」,每一區域搜索完畢後 ,需標註記號,以避免重複搜索或遺漏搜索。 。 (4)入室搜索應伴隨水線掩護 ,並預留緊急脫離路線。 緊急脫離路線。(5)設有電梯處所發生火警時,應立 即將所有電梯管制至地面層,以防止民眾誤乘電梯,並協助避難。(6)對被搜救出災民實施 必要之緊急救護程序……8.侷限火勢……9.周界防護……10.滅火攻擊……11.破壞作業…… 12.通風排煙作業……13.飛火警戒……14.殘火處理……15.人員裝備清點……。
26
人員採取就地避難戰術為宜,並由第一大隊大隊長 綜合判斷整個狀況,也認為就地避難為宜。為實際 安撫7、8、9樓之民眾,勘查狀況並為後續引導下 樓之準備,火場初期由消防人員兩人為一組分別至 7、8、9樓,請民眾於房內關閉門窗就地避難,俟 狀況再行撤離。本案火場落實兩人以上一組入室, 至於人員登錄管制部分, 管制部分,110年6月30日19時54分彰 化及東區救災車組到場後,初期安全管制人員由彰 化分隊隊員黃○○擔任,經檢視彰化分隊隊員黃○ ○、郭○○以無線電回報指揮官由中正側上樓查 看,未經安全管制人員管制入室,其餘依規定登錄 管制等內容。 (四)而據本院赴喬友大樓履勘,因本案現場救災消防人 員於第一時間疑似未拿到房間使用資料,當時業者 均已逃離至地面,因此消防人員無法從業者端獲得 資訊,故上樓搜索耗時,且 耗時,且1樓至4樓往上延燒因素 就是電扶梯,消防人員對於建築物的資訊掌握有所 落差。彰化縣消防局對此表示,進入旅館之消防人 員第一時間有向業者取得住宿名單資訊,並以通訊 軟體LINE傳送住宿名單,後續幕僚人員有請7樓隊 員郭○○跟業者要平面圖說, 面圖說,然旅館人員要從電腦 開啟資料時停電,以致於無法順 利取得平面圖說 面圖說。 至於1樓至4樓電扶梯部分,初期彰化分隊人員於2 樓吧台附近發現火點,因2樓電扶梯被裝潢材料包 覆、隱蔽,爰救災人員無法得知電扶梯構造及防火 區劃情形。 (五)再據彰化縣消防局火災搶救報告書檢討內容略 以:「火災初期帶隊官小隊長劉○○為隊員陳志 帆、陳○○、謝○○、朱○○之帶隊官,從三民梯 入室過程單獨脫隊,未確保編組完整性,及必要時
27
迅速下命進行迴避、撤退等處置作為,後由隊員自 行分配任務,隨同從中正梯上樓之隊員黃○○、郭 ○○共6人,自行分配2人1組執行任務。帶隊官小 隊長劉○○脫隊後,未向指揮官報告狀況。」、「火 場指揮中心運作:……因應火場持續擴大,分別依 職權進行人命救助及火災搶救部署任務及救護人 員執行緊急救護、協調他單位協助救災等工作,惟 未依災情危害程度回報級數及指揮權轉移宣告周 知現場人員並回報救災救護指揮科。」彰化縣政府 於110年11月3日提出「彰化縣喬友大樓火災事件」 行政調查報告以「火場搶救安全管制之行政疏失, 同該縣消防局火災搶救報告書內容,包括該縣消防 局第一大隊東區分隊小隊長單獨脫隊、安全幕僚未 及時通知入室人員撤出、輪替小組人員擅自變更任 務。」 (六)再據內政部災調報告揭示,彰化縣消防局於本案事 事故救災有「未落實隊員、帶隊官及指揮官之三層 安全管理機制」、「災害現場獲取之建築相關資訊有 限,影響消防人員救援及撤離」等情事,為造成本 案消防人員殉職之次要成因,分述如下: 1、未落實隊員、帶隊官及指揮官之三層安全管理機 制: (1)火災初期劉○○為隊員陳志帆、陳○○、謝○ ○、朱○○之帶隊官,從三民路側安全梯入室 過程單獨脫隊,未確保編組完整性,及必要時 迅速下命進行迴避、撤退等處置作為,後由隊 員自行分配任務,隨同從中正梯上樓之隊員黃 ○○、郭○○共6人,自行分配2人1組執行任 務。帶隊官劉○○脫隊後,未向指揮官報告狀 況。
28
(2)初期劉○○、隊員陳志帆、陳○○、謝○○、 朱○○約20時06分入室,現場至20時39分始詢 問陳志帆及陳○○殘壓為100BAR 18,安全幕僚未 隨時或定時與救災人員保持聯繫,通知準備撤 退或立即退出火場,火場內、外協調聯繫及安 全管制待加強。 (3)安全幕僚只側重氣瓶量管制,但對陳志帆等進 入、撤出的風險評估,搜救路線部署水線的掩 護,搜索繩運用,屋外射水攻擊之避讓等,執 繩運用,屋外射水攻擊之避讓等,執 行不夠積極,讓陳志帆失去風險預警的協助。 2、災害現場獲取之建築相關資訊有限,影響消防人 員救援及撤離: 參與火災現場搶救消防人員得到的建築物內 部相關資訊有限(建築平面圖、乙種搶救圖、受 面圖、乙種搶救圖、受 困人數、位置等),影響救援時效與有效救援。 (1)指揮官不知4樓以下有座貫穿樓板的電扶梯, 因而造成火勢迅速擴大:火勢初期僅在2樓三 民路側,指揮官佈水線進入2樓搶救,同時指 派人員上樓搜救。火勢突然從3、4樓窗口竄 出,事後研判是從電扶梯往上竄燒,由於已停 用的電扶梯用木板遮蔽,從外觀無法知悉,對 於外部指揮官及內部消防員在下達指令及佈 線搶救作為上,相當危險。 (2)指揮官不知防火區劃防火門破壞或管理有疏 漏:火勢原本只在低樓層,指揮官決定7樓至9 樓商旅隔離人員就地避難且派遣消防人員上 樓協助,戰略考量應屬合宜;由於缺乏足夠資
18彰化縣政府查復,氣瓶使用時間依個人體質、體型、情緒及工作程度等皆會不同,經該縣消 防局第一大隊訓練所屬消防人員時測試, 所屬消防人員時測試,運用跑步機模擬輕度工作至殘壓警報響起(50BAR )轉為侷限呼吸下至氣瓶用罄,平均 均54.17分鐘,實際使用情形應該員當時狀況為準。
29
訊,不知有些樓層安全梯防火門被拆除或被開 啟、貫穿樓層的管道未完全填塞,因火勢的突 然擴大,指揮官下令撤出人員,因建築物防火 及防火避難設施的未完善,造成高熱濃煙竄入 各樓層,造成上樓救援的消防員及民眾的傷 亡。 (3)陳志帆不知現場環境、隔間情形、安全梯、防 火區劃、排煙設備等是否可靠堪用符合規定: 陳志帆進入9樓前應不知該等設施的良窳,致 生危機,如前述從安全梯退避到走廊排煙室, 再退避至無窗房間。事後分析如陳志帆事先得 知隔間情形,就在陳志帆殉職房間前通道旁, 就是天井(有擅自加隔層置物),是相對安全 的空間,又或另覓1間有窗的房間待援,生存 機會相對提高。 (4)百香果商旅負責人經現場指揮官要求提供建 築物建築平面圖及各居室密碼鎖開啟方式 面圖及各居室密碼鎖開啟方式 後,未及時提供,只有提供員工、房客人數及 中正梯可供安全救災使用之資訊。由於現場平 面圖是指揮官決定火場搶救戰術重要依據之 一,及時提供將有助於戰略判斷及減少人員傷 亡及財物損失。 (七)綜上,火場指揮官、救火指揮官分別職司統一指揮 火場救災、警戒、救火偵查等勤務,以及負責指揮 人命救助及火災搶救部署任務,指揮官應掌握火場 資訊以作為火災搶救部署之依據。然彰化縣消防局 於喬友大樓火場執行救災任務,未落實隊員、帶隊 官及指揮官之三層安全管理機制,有第一大隊東區 分隊小隊長單獨脫隊、安全幕僚未及時通知入室人 員撤出、輪替小組人員擅自變更任務等疏失。甚且
30
於斯時因停電致無法從業者處取得百香果商旅之 平 面圖說,另因 面圖說,另因2樓電扶梯被裝潢材料包覆、隱蔽, 救災人員亦未能掌握喬友大樓1至4樓電扶梯構造 及防火區劃情形,肇生本事件救災指揮調度難有依 循,亟待檢討改進。
四、彰化縣消防局第一線消防員額懸缺多時未予遴補,致 該縣消防人口服務比於近3年遠高於全國平均 均(110年 為1:1,465),亦為全國之最(108年至110年依次為1: 1,829、1:1,830、1:1,791)。且據查該縣消防分隊 第1梯次到達火場現場平均人車數、 均人車數、人車比均不升反 降。火災搶救效率及整體消防戰力之發揮係依人車派 遣及消防機關火場指揮及部署,據火場搶救作業要點 第7點,為爭取救災時效,消弭災害於無形,第一時 間應有效集中派遣,並主動提升救災指揮層級。然喬 友大樓火災發生時,彰化縣消防局未能於第一時間以 車隊有效集中派遣,該局第1梯次僅派2個分隊救災能 量前往救災,後續指揮中心派遣僅單1消防車輛,未 以車組形式派遣,以強化指揮官救災人力調度,且派 遣救災車輛間隔時間皆甚長。此外尚有幕僚管制作業 未臻完備、水線部署未能有效壓制火勢、人力不足卻 未妥適調度或請求支援,凸顯該縣消防人力不足、設 備尚待充實,肇致轄內發生重大火災事故時,人車派 遣及救災人力調度之困境,亟待檢討改進。 (一)依地方制度法第18條至19條、第55至第56條及第62 條規定,直轄市、縣(市)災害防救等公共安全事 項與組織及人員任免等人事管理,屬地方政府權 責。復為解決地方消防人力不足問題,內政部研 足問題,內政部研訂 「充實消防人力推動計畫」,並經行政院主計總處 自107年度起納入「中央對直轄市與縣(市)政府計
31
畫及預算考核」,並自108年起以5年增補3,000人為 目標,使全國消防人員「服務人口比」於112年達1: 1,300,117年達1:1,100,以增補人力及改善勤休 情形。 (二)最低救災人數以1車3人為計算,經本院調查地方消 防機關消防人力預估增補情形(111內調0026)發 現,彰化縣政府第一線消防員額懸缺多時未予遴 補,未充分運用預算員額等狀況,且彰化縣消防分 隊第1梯次到達火場現場平均人車數呈現下降(人 均人車數呈現下降(人 數由106年4.68人減少至110年10月4.21人、車數由 106年2.63車減少至110年10月2.16車),以及人車 比不升反降(人力/車輛比由2.53減少至110年10月 2.37)等情,人車比小於3人時即顯示消防機關人 車配比失衡及人力不足,倘災害發生時將凸顯人力 之不足。再依消防署 19統計至110年12月底資料,全 國各地方消防機關編制員額19,554人,預算員額 17,030人,實際員額15,958人,消防人口服務比, 以實際員額計為1:1,465,其中彰化縣消防人口服 務比於108年至110年依次為1:1,829、1:1,830、 1:1,791,均為全國之最 20。復有內政部災調報告 指出「救災人力不足,未及調用義消或鄰近之臺中 市分隊前往支援」等內容可稽。再參據彰化縣消防 局火災搶救報告書策進作為提出「1.增購50公尺雲 梯車1輛:轄內11層以上建築物126棟,現有50公尺 雲梯車1輛、30公尺雲梯車6輛,為加強高樓救災及 人命救助工作,實需增購50公尺雲梯車1輛。2.購
19 資料來源:消防署網站,https://www.nfa.gov.tw/cht/index.php?code=list&ids=223。 20 110年消防人口服務比逾1:1,300以上者計13縣市,依序為彰化縣1:1,791、高雄市1:1,774 、臺中市1:1,670、新北市1:1,662、臺南市1:1,629、新竹市1:1,519、桃園市1:1,420 、臺北市1:1,394、屏東縣1:1,380、新竹縣1:1,380、基隆市1:1,373、宜蘭市1:1,314 、雲林縣1:1,441。
32
置耐燃發光繩:以利濃煙 濃煙密布火場環境之搜救、滅 火作業及火場進出引導,保障入室救災同仁安全。 小分隊配置60公尺長、大分隊及RIT分隊配置120公 尺長。3.購置電池式排煙機:藉由適當有效的通風 排煙,將火場中燃燒產生的有機化學物質及有毒氣 體釋放至戶外空間,降低救災人員危害及確保內部 人命安全。本局各分隊配置至少1台。」可證彰化 縣消防人力不足及消防裝備器材,均亟待充實改 善。 (三)另據消防署訂定火場搶救作業要點作為各消防機關 火場指揮及搶救依循規範,其目的係為提升消防機 關火場指揮能力,強化火災搶救效率,發揮整體消 防戰力,以確保人民生命財產安全。火場搶救作業 要點第6點第1項規定,為利於火場指揮及搶救,得 於火場指揮及搶救,得 設火場指揮中心、人員裝備管制站及編組幕僚群, 幕僚群分別為安全幕僚、情報幕僚、水源幕僚及傳 令幕僚等,各司其職協助指揮官運作指揮事務。第 10點規定轄內火災災情死亡2人以上者,應製作火 災搶救報告書,並邀集參與救災單位召開會議,就 搶救過程之聯繫作業、搶救處置及指揮決策等,檢 討優劣得失,作為策進搶救作業模式及參與救災人 員獎懲依據。 (四)依彰化縣消防局火災搶救報告書,除前述調查意見 指出本案有未符火場搶救作業要點事項外,幕僚作 業協調聯繫尚有下列應檢討改進事項: 1、第1梯次從中正路側樓梯進入7樓人命搜救組,有 立即回傳旅館受困人數、房號等相關資訊,於20 時23分分享於大(分)隊Line群組,情報幕僚未 於第一時間充分利用取得之資訊 用取得之資訊。 2、「人員入室超過15分鐘時,安全幕僚應提醒該名
33
同仁準備撤退,另入室人員超過20分鐘時,則安 全幕僚應通知該名同仁立即退出火場。」初期小 隊長劉○○、隊員陳志帆、陳○○、謝○○、朱 ○○約20時06分入室,現場至20時39分始詢問陳 志帆及陳○○殘壓為100BAR,安全幕僚未立即通 知退出火場,火場內、外協調聯繫待加強。 3、21時05分經原8樓下撤之謝○○聯繫輪替小組, 才知道沒辦法上去之答案,人力派遣及後續作為 掌握度待加強。 (五)消防署查復,對於本案火災搶救過程與火場搶救作 業要點規定,有下列待檢討改進之處: 1、獲報情形:本件火警民眾持續通報火災事件,顯 見該棟建築物已造成燃燒現象,經查該局火災搶 救報告書指揮中心第1梯次僅派2個分隊救災能 量前往救災,惟後續派遣救災車輛間隔時間皆甚 長。為爭取救災時效,消弭災害於無形,第一時 間應有效集中派遣,並主動提升救災指揮層級。 另查後續指揮中心派遣僅單1消防車輛派遣,未 以車組形式派遣,以強化指揮官救災人力調度。 (火場搶救作業要點第7點第3款第1目) 2、指揮調度、人員搶救、水線部署: (1)查該局無線電(現場)頻道通聯譯文20時14分 04秒因窗戶破燒,大量空氣流入,造成火勢濃 煙擴大,另查該局火災搶救報告書參、搶救部 署狀況:一、火災動態資料及指揮概況表: 況:一、火災動態資料及指揮概況表:20 時18分指揮官指示進行火勢射水侷限火勢,雖 通知室內滅火小組撤出,惟濃煙迅速竄出防火 區劃流入其他樓層,仍造成7至9樓消防人員無 法下樓。 (2)火場搶救作業要點第6點第1項第3款第1目規
34
定,安全幕僚應監視現場危害狀況,執行火場 況,執行火場 安全管制機制,進行搶救目的與救災作業風險 評估,適時向指揮官提出風險警示。20時39分 指揮幕僚僅詢問7至9樓消防人員空氣瓶氣 量,對於火勢轉變的風險評估未多注意;爰 此,未通知樓上同仁立即撤離,指揮幕僚管制 未完善。 (3)彰化縣消防局火災搶救報告書二、搶救部署行 動流程表之部署概要,現場水線攻擊均以2.5 英吋轉1.5英吋水線出水,1.5英吋水線流量小 且較易打折,又現場救災水線不足。 足。因現場全 面燃燒火災相當猛烈,應以2.5英吋出水攻 擊,以強化火勢壓制為宜。 (六)又據內政部災調報告指出,本案受理派遣、部署搶 救措施待改善,包括「救災派遣應掌握之原則為明 確、合理、有效,惟檢視該縣火災搶救派遣單等相 關資料,第1梯次與第2梯次派遣時間差約6分鐘, 第2梯次與第3梯次救災車差約25分鐘,而雲梯車派 從19時49分派遣後陸續至23時33分共派6部雲梯 車,未能於第一時間集中有效派遣,另初期支援分 隊未採車組派遣,及遵守在隊人數與派遣車輛數之 人車比限制規定(第3梯次以後皆以1車為主),僅 隊員駕駛消防車,而無幹部帶隊,又為避免轄區戰 力真空,應有車輛人員進行補位動作」、「初期到達 之轄區分隊未佔據水源,另火警現場全面燃燒且火 載量大,所佈之水線僅3線,且使用1.5英吋水線射 水灌救,此易因水帶打折造成流量減少,無法全面 鎮壓火勢,另有分隊雲梯於操作中2度故障無法正 常運作。」,以及救災人力不足、未善用民力及未
35
調用他轄支援 21等內容,可證彰化縣消防局於本案 火場指揮調度、派遣、幕僚管制、水線部署均有待 檢討改進。 (七)綜上,彰化縣消防局第一線消防員額懸缺多時未予 遴補,致該縣消防人口服務比於近3年遠高於全國 平 均( 均(110年為1:1,465),亦為全國之最(108年 至110年依次為1:1,829、1:1,830、1:1,791)。 且據查該縣消防分隊第1梯次到達火場現場平均人 均人 車數、人車比均不升反降。火災搶救效率及整體消 防戰力之發揮係依人車派遣及消防機關火場指揮 及部署,據火場搶救作業要點第7點,為爭取救災 時效,消弭災害於無形,第一時間應有效集中派 遣,並主動提升救災指揮層級。然喬友大樓火災發 生時,彰化縣消防局未能於第一時間以車隊有效集 中派遣,該局第1梯次僅派2個分隊救災能量前往救 災,後續指揮中心派遣僅單1消防車輛,未以車組 形式派遣,以強化指揮官救災人力調度,且派遣救 災車輛間隔時間皆甚長。此外尚有幕僚管制作業未 臻完備、水線部署未能有效壓制火勢、人力不足卻 未妥適調度或請求支援,凸顯該縣消防人力不足、 設備尚待充實,肇致轄內發生重大火災事故時,人 車派遣及救災人力調度之困境,亟待檢討改進。
五、彰化縣消防局消防隊員於20時47分於無線電獲悉隊 員陳志帆求救訊號及受困於喬友大樓9樓百香果商 旅,但未能確知其受困位置,復因無線電訊號阻隔, 至21時05分下樓後方回報受困訊息。指揮官自21時11
21 本案火災事件,火勢在1樓至4樓擴大猛烈燃燒,火場面積大且火煙持續往上蔓延,上層為 百香果商旅大量住民待救,情況甚為危急,救災及搜救之花費時間甚長,救災人力不足,未 及調用義消或鄰近之臺中市分隊前往支援(僅約10幾分鐘車程)。
36
分派遣第1梯次緊急救援小組(RIT)救援,期間陸續 共派出19梯次,惟因安全梯已遭火煙吞噬難以突破, 雲梯車遭路旁停放機車阻礙而未能遂行救援任務,至 隔日02時30分第17梯次RIT於商旅房間內尋獲受困消 防員,救援時間已近6小時。彰化縣消防局於案發時 因百香果商旅仍有住民受困,火場初期火勢尚未發 展,指派人員上樓入室搜救,然斯時卻未能伴隨水線 掩護、預留緊急脫離路線 緊急脫離路線。另據內政部災調報告,彰 化縣消防局於本案救援期間派出19梯次83人緊急救 援小組(RIT),均因碰到火煙阻隔、氣瓶用罄、雲梯 車無法接近等阻礙未能遂行救援任務,但卻無法及時 改變策略,整合戰力,突破障礙,進行有效救援,救 援應變策略有待精進。 (一)依火場搶救作業要點第5點規定,人命搜救自受理 報案開始即應以人命搜救為最優先考量。抵達火場 後,優先進行人命搜救任務。入室搜索 應伴隨水線 掩護,並預留緊急脫離路線。 緊急脫離路線。復參照消防署「消防 人員救災安全手冊」第八章(已修正調整為第十章) 入室搜救安全指導原則執行搜救任務等規定,如: 2人以上1組並以水線掩護入室、保留退出火場所需 退出火場所需 花費的時間 22、同進同出、互相保持聯繫 23、防止退 出路線受阻 24……等,以強化救災安全。 (二)彰化縣消防局於本案消防員受困火場及火場緊急應 變救援小組(或稱快速救援小組,Rapid
22 搜救人員依據深入距離及個人工作狀態下之空氣使用量,計算作業時間時要考慮退出火場 所需花費的時間,並與分區指揮官保持聯繫,依情況需要,應有折返點觀念於殘壓警報音響 鳴動前即可判斷撤離時間;當空氣瓶殘壓警報音響鳴動時,應迅速沿原路或預留退路退出。 退路退出。 23 搜救人員間的確保繩索應保持不鬆不緊的狀態,準備退出時,彼此間應以拉繩、無線電、 應保持不鬆不緊的狀態,準備退出時,彼此間應以拉繩、無線電、 警笛或擴音器做為聯絡之方式。 24 搜救人員應隨時注意行經路徑之相對安全區,進入安全梯前往其他樓層時,應確認安全門 不會自動反鎖,若安全門可能自動反鎖時,應以水帶、繩索、適當之物品或固定鎖舌開關, 、適當之物品或固定鎖舌開關, 防止安全門反鎖,以預留退路。另防火鐵捲門可能自動下降影響搜 救人員退路,應特別留意 意 下降後之退出路線。
37
Intervention Team,RIT)執行情形 1、20時19分:大隊幕僚人員呼叫隊員陳○○、陳志 帆小組,詢問防疫旅館是否有煙上去並詢問小組 位置。回報在9樓,樓上有8名民眾。有濃煙竄出, 目前請旅客及員工在寢室裡面先待著。 2、20時30分:隊員陳○○、陳志帆小組回報彰化 01,目前9樓2名消防人員及8名民眾全在相對安 全區。 3、20時36分:隊員陳○○、陳志帆小組回報彰化01 目前9樓充滿濃煙,彰化01請小組到安全門那 邊,看有沒有關(未回應)。 4、20時39分:大隊幕僚人員呼叫7、8、9樓人員詢 問氣瓶BAR數,隊員陳○○、陳志帆小組回報皆 100BAR。大隊幕僚人員回覆,我請人員上去跟你 們替換。 5、20時47分:依隊員謝○○陳述,聽到陳志帆以喊 MAYDAY求救訊號(地面未接收到明顯訊號),隊 員陳志帆說明在9樓的房間,也不知道是哪一間。 謝○○請陳志帆敲擊地面發出聲響以分辨位 置,並請陳員侷限呼吸,謝○○、朱○○聽到聲 響後原嘗試想上9樓救援,離開臨中正路8樓安全 梯防火門時,發現防火門關閉後即上鎖無法進 入,遂想9樓防火門應該也是上鎖而無法進入狀 態,改下樓向其他人求援。據詢問當時位於7樓 隊員黃○○,現場未知悉20時47分之求救訊息, 另地面第一大隊幕僚人員也表示現場未知悉上 述求救訊息。 6、21時05分:彰化8樓同仁(隊員謝○○)下樓轉 達隊員陳志帆求救訊號,在9樓第三面的廁所。 7、21時18分:隊員陳志帆回報彰化31所在位置無對
38
外窗,無法拿氣瓶及打燈引導。 8、21時18分:地面人員發現中正路安全梯窗戶有消 防人員趴著,無線電呼叫陽台上面是哪一位同 仁?東區○○是你嗎?(未回應) 9、21時20分:隊員陳志帆回報受困某房廁所裡,只 有我一個,我在廁所裡。(21時22分發出最後訊 息),因一樓無法接收其訊號,由彰化31轉達訊 給彰化01。 10、20時54分:入室至7、8、9樓之輪替小組,因三 民路側安全梯間受高溫濃煙阻隔,回報沒辦法上 去。 11、21時11分(第1梯次RIT):指派鹿港分隊6人組 成快速救援小組,該小組從三民路側樓梯於四樓 遇火煙阻礙,無法繼續上樓,下撤。 12、23時55分(第10梯次RIT):救援大村及東區受 困消防同仁,尋獲東區受困隊員陳○○。 13、00時41分(第13梯次RIT):救援大村受困消防 同仁,尋獲2名大村受困消防同仁。 14、02時00分(第17梯次RIT):於9627房尋獲東區 受困同仁故分隊長陳志帆。 15、彰化縣政府提供斯時消防員陳志帆受困時之重 要無線電錄音訊息,如下: 音訊息,如下: 20:48:53謝○○:志帆、志帆你位置在哪? 20:48:55陳志帆:9樓的房間,也不知道是哪一間。 20:49:00謝○○:你BAR數剩多少?我在8樓。 20:49:04陳志帆:沒氣了… 20:49:06謝○○:好,你堅持一下,我上去找你。 20:49:25大隊05:志帆,大隊05呼叫。 20:49:27謝○○:那你堅持一下,用情境呼吸,小心一 點,別嗆到。
39
20:49:35陳志帆:沒氣了.. 20:49:37謝○○:我會帶你下來相對安全區,是否收 到? 20:55:22陳志帆:救命、救命。 21:18:43謝○○:志帆,你那邊是不是廁所有對外窗對 不對? 21:18:45陳志帆:沒有。 21:21:35彰化31:東區志帆,你那邊相對安全嗎?還有 其他民眾在那邊跟你一起嗎? 21:21:41陳志帆:都沒有,只有我一個,我在廁所裡面。 21:21:58彰化31:彰化01、彰化31呼叫。 21:22:00彰化01:彰化01回答。 21:22:02彰化31:東區志帆目前1個人而已,目前在廁 所裡面,沒辦法有窗口對外。 21:22:12彰化01:收到,麻煩你跟志帆通知一下,等一 下我們會有人員進去拿SCBA氣瓶給他,是否收到? 21:22:22彰化31:收到。 21:22:26陳志帆:東區志帆收到。 (三)彰化縣政府表示火災當時無線電設備正常,但無線 電通訊品質,會受到建築物構造、蓋台、環境噪音 等因素影響,後續前往殉職位置,現場實際測試, 無線電訊號正常,但如防火門及房門等2扇門均關 上時,訊號則會受到影響,然本案多數訊息,無線 電錄音檔均有蒐錄,而該縣消防局救災現場無線電 ,而該縣消防局救災現場無線電 錄 音係透過地面消防車傳送至彰化縣消防局機房 音係透過地面消防車傳送至彰化縣消防局機房 進行錄音,亦即代表無線電多數訊號有傳送成功, 音,亦即代表無線電多數訊號有傳送成功, 經查當時(20時44分)隊員陳○○發出之無線電訊 號為呼叫東區01,惟該人員當日輪休,不在現場救 災,故無法回應其訊號,依上述重要無線電錄音訊 音訊 息可證當時設備正常及訊號傳遞尚屬良好。
40
(四)續以,彰化縣政府就本案RIT救援情形補充說明如 下: 1、RIT伙伴救援第1梯次有攜帶備用氣瓶,該梯次人 員於梯間受火煙阻隔無法上樓,即將備用氣瓶置 放於梯間,以便後續救援人員攜帶上,另查其餘 後續救援人員攜帶上,另查其餘 2、4、13及14梯次亦有攜帶有備用氣瓶。RIT 伙 伴救援第1梯次有攜帶熱顯像儀TIC,後續梯間多 梯次無法突破火勢上樓,另運用雲梯車RIT梯次 部分,成功救援受困消防同仁3名。 2、本案計19梯次RIT伙伴救援,在梯間受火煙阻隔 無法於梯間上樓階段,計有第4、8、10、11、13 梯次等5梯次有運用雲梯車載送前往救援,並且 成功救援消防人員3人(隊員陳○○、隊員連○ ○、隊員賴○○),自第14梯次後即可使用梯間 救援。 3、水線部署考慮救災現場狀況,包含火勢狀況、消 防人力、消防栓流量及戰術考量等,本案採取侷 限火勢戰術,避免向上擴大延燒衝擊7、8、9樓, 以免造成大量傷亡事件。執行結果在多條水線放 射,無水源中斷下,將火勢壓制於4樓以下,火 流未一直上升,達一定壓制程度之效果。至於濃 煙係由管道間、電梯豎井、安全梯等垂直管道上 升,非消防設備或技術問題。 4、救災過程過於冗長,係因救災阻礙因素 25,在惡 劣條件下,消防人員仍多梯次派遣,想辦法挺
25 (1)本案現場2、3、4樓為閒置未加管理的大樓建築,防火避難設施未臻完善,防火門開 啟、遺失或損壞,大樓內部管道間垂直區劃、水平區劃未落實填塞,使現場消防人員及民眾 區劃未落實填塞,使現場消防人員及民眾 於火災報案後30分鐘內即遭遇大量濃煙,阻礙救援動線,增加救援的困難與危險。(2)現場2 至4樓內部電扶梯,造成火煙延燒路徑,且內部使用易燃材料裝修,造成火勢迅速擴大燃燒, 增加侷限火勢的困難度。(3)火勢成長下,2座安全梯均被火煙吞噬,形成煙囪效應,阻斷消 防人員入室救災及民眾避難逃生的路徑,僅可倚靠雲梯車執行高空作業,導致救災效率緩慢 。
41
進、進入,並盡全力把火勢控制在4樓以下未再 向上延燒,否則恐會造成更多人命傷亡。 5、喬友大樓三民路側及中正路側兩安全梯遭受猛 烈火煙襲擊後,無法作為預留之脫離路線 之脫離路線;彰化 分隊雲梯車(代號彰化31)到場後即升梯警戒, 同時設定預為脫離路線之一,至20時14分左右三 民路北側玻璃帷幕燒破,竄出大量火勢及濃煙影 響等情,導致雲梯車無法作為每梯次搜索人員之 人員之 脫離路線。 (五)據本院實地履勘並聽取同組獲救消防員陳○○現場 說明進入喬友大樓搜救、走散及獲救經過 26,以及 內政部災調報告之訪談摘要:「劉小指示上7樓至9 樓防疫旅館,請民眾關門待救,……我與志帆學長 在9607會合,我順時鐘繞回電梯,總共確認民眾是 8人……,我們往回走已經找不到三民梯的入口在 那,一直到志帆學長的氣瓶沒有氣,他就找一個房 間就進去,我也跟著進去,我們有看過,雖有煙不 像走廊一樣濃,我們討論緊急求救鈕要不要先按, 發話沒有人回,也沒有任何訊號,要不要我先去找 有窗戶的房間,他說好,……我摸一陣子後就摔下 樓梯,我才知道我在樓梯間,摔落樓梯前我並不知 道有中正梯的存在,我想試著往下走,走不到1層 遇煙熱走不下去,之後就往上走,在樓梯間我的殘 壓警報響起,沒氣時我就推開了窗戶在那待救,我 窗戶在那待救,我 的想法是先壓救命器警報,氣瓶解開,消防帽拿 下,我後來被救出才知道是9樓。」
26彰化縣政府查復,根據同組隊員陳○○本人說法:與陳志帆共同巡視9樓,發現濃煙迅速布 滿9樓,與陳志帆於某間居室就地避難,但發現那間房間沒有對外窗,當時陳○○空呼器殘氣 量比陳志帆空氣量多,故兩人討論後陳志帆留於原地、陳○○向外尋求有窗戶之房間,後摔 於原地、陳○○向外尋求有窗戶之房間,後摔 落樓梯間迷失方向,靠窗就地自救。
42
(六)彰化縣消防局於本案派遣RIT救援,確有因喬友大 樓安全梯遭火煙吞噬難以突破,且雲梯車路旁停放 大量機車與鐵欄桿等因素,導致雲梯車無法順利靠 靠 近救援,此有內政部災調報告內容:「3.緊急救援 小組(RIT)搶救作為有受阻情形:(1)安全梯通 行受阻:王分隊長已知樓上有同仁受困,於21時11 分指派劉分隊長組成緊急救援小組(Rapid Intervention Team,RIT)前往9樓救援消防同仁, 後續並持續派員前往救援9樓民眾和同仁,但不論 是中正路側或三民路側的救援任務,都有幕僚回報 上不去之情況。(2)雲梯消防車不易靠近:另救火 指揮官於21時50分開始指揮雲梯車運送溪湖分隊 同仁前往9樓救援民眾及同仁,但因建築物內部不 斷有濃煙竄出及外部鷹架阻隔,雲梯車不易靠近。 0時左右,二林分隊緊急救援小組(RIT)從三民路 雲梯車上至9樓,同時找9樓中正梯側窗邊受困同仁 及大村分隊同仁。中正路那一側的樓梯通道3樓因 濃煙高溫,救災人員受阻擋無法順利抵達 抵達9樓,空 地及道路旁停車格也停放大量的機車與鐵欄桿等 停車設施,導致雲梯車無法順利靠近救援, 靠近救援,0時13 分中正路排除路邊障礙後,0時20分東區31才得以 升梯靠近8樓。」等內容可證。 (七)然而,彰化縣消防局自20時47分知悉人員受困,迄 嗣後陸續派遣RIT救援達19梯次,於隔日02時30分 第17梯次RIT於商旅房間內尋獲受困消防員,RIT救 援受阻卻未能及時改變策略以突破障礙,救援應變 策略確有待精進,此據彰化縣消防局火災搶救報告 書自承:「消防人員緊急救援小組(RIT)戰術運用: 得知有救災人員受困後,多次啟動RIT救援因火勢 猛烈受阻,指揮官應適時調整戰術,重整人力投入
43
緊急救援行動。」以及內政部災調報告指出:「4. 無線電使用管控待加強:無線電通訊設備及訊號正 常,惟20時47分陳志帆求救,8樓人員獲悉訊息救 援未果,21時05分彰化01才獲知訊息,受建築結 構、地形及地物等影響通訊品質。本案火警出勤單 位多達23個,無線電頻道有互相蓋台、佔頻情形, 現場大規模的情況下,淨空頻道這指令並未成功, 造成統一指揮不易」、「救援應變策略有待精進:陳 志帆20時47分無線電回報沒氣了,消防局執行逐層 ,消防局執行逐層 逐戶搜索任務,到隔日 任務,到隔日02時30分於9627號房間內浴 室地板發現陳志帆,救援耗時將近6小時。依據彰 化縣消防局簡報資料,期間派出19梯次83人緊急救 援小組(RIT),均因碰到火煙阻隔、氣瓶用罄、雲 梯車無法接近等阻礙未能遂行救援任務,但卻無法 及時改變策略,整合戰力,突破障礙,進行有效救 援。而經訪談內容顯示,部分救援小組成員表示並 未收到為緊急救援小組(RIT)的任務指示,僅收 到人命搜救指令,甚至未知陳志帆受困,所以也並 未攜帶緊急救援小組(RIT)救援裝備。」等內容 可稽。 (八)末據消防署查復,彰化縣消防局第一時間派遣人員 上樓進行搜救及安撫等行動。由於當時火勢尚未撲 滅,同仁執行任務時,仍應參照消防署「消防人員 救災安全手冊」第八章(已修正調整為第十章)入 室搜救安全指導原則執行搜救任務等規定,如:2 人以上1組並以水線掩護入室、同進同出、互相保 持聯繫、防止退出路線受阻……等,以強化救災安 全等內容參照。 (九)綜上,彰化縣消防局消防隊員於20時47分於無線電 獲悉隊員陳志帆求救訊號及受困於喬友大樓9樓百
44
香果商旅,但未能確知其受困位置,復因無線電訊 號阻隔,至21時05分下樓後方回報受困訊息。指揮 官自21時11分派遣第1梯次緊急救援小組(RIT)救 援,期間陸續共派出19梯次,惟因安全梯已遭火煙 吞噬難以突破,雲梯車遭路旁停放機車阻礙而未能 遂行救援任務,至隔日02時30分第17梯次RIT於商 旅房間內尋獲受困消防員,救援時間已近6小時。 彰化縣消防局於案發時因百香果商旅仍有住民受 困,火場初期火勢尚未發展,指派人員上樓入室搜 救,然斯時卻未能伴隨水線掩護、預留緊急脫離路 緊急脫離路 線。另據內政部災調報告,彰化縣消防局於本案救 援期間派出19梯次83人緊急救援小組(RIT),均因 碰到火煙阻隔、氣瓶用罄、雲梯車無法接近等阻礙 未能遂行救援任務,但卻無法及時改變策略,整合 戰力,突破障礙,進行有效救援,救援應變策略有 待精進。
六、喬友大樓2、3、4樓屬停業閒置空間,於火災發生前 未執行建築物公共安全檢查,其防火區劃遭受破壞, 致火煙擴散蔓延而影響避難逃生安全。針對是類複合 式大樓內閒置空間應否辦理建築物公共安全檢查申 報,內政部於本案發生後雖稱,建築法第77條已課予 建築物所有權人、使用人應維護建築物構造及設備安 全之責任,不因停(歇)業而免除,是故供公眾使用 因停(歇)業而免除,是故供公眾使用 建築物(非供公眾使用經內政部指定者亦同)縱屬停 (歇)業狀態,仍應持續辦理公共安全檢查申報。 態,仍應持續辦理公共安全檢查申報。然 據本院調查於本案發生前,各地方主管建築機關於執 行實務上均未要求類此停業閒置空間應辦理建築物 公共安全檢查,顯然對於大樓內閒置廢棄空間,中央 及地方主管建築機關認定不一。值此事件後,內政部
45
已檢討並要求整棟供公眾使用建築物公共安全檢查 列為整體申報之範圍及檢查。此外該部營建署亦擬具 公寓大廈管理條例修正草案,涉及公共安全疑慮者均 應限期成立管理委員會或推選管理負責人,以進行相 關公共安全事項之辦理,如未限期成立,將予以裁 罰。另消防署分析近年彰化喬友大樓等火災案件,人 員傷亡係管理權人或防火管理人未維護建築物合法 使用與構造設備安全、未落實執行通報、避難疏散 等,為強化建築物消防安全管理及場所自主防救災能 力,刻正提出修正消防法、推動消防設備人員法立 法,另並通函全面清查全國防疫旅館之消防安全管 理。行政院應積極督同內政部及各地方主管機關落實 辦理,並推動相關法令修改進度,俾從制度面消弭危 害公共安全風險因子。 (一)彰化縣政府查復,喬友大樓建築物公共安全檢查申 報情形,該建築物有營業樓層為一樓為B1遊藝場使 用及6至9樓為B4旅館使用,上開營業場所均依上該 規定申報公共安全檢查在案;其中一樓「新鑫馬電 子遊戲場業」109年度依規申報合格備查,並於110 年3月25日由該府委託社團法人彰化縣建築師公會 辦理複查,結果為合格。110年度申報因疫情原因, 依內政部110 年5 月19 日內授營建管字第 1100808203號函示得展延至本年度第3季前(9月底 前)辦理;另6至9樓「百香果商旅」業已委託專業 檢查人於110年3月26日至110年4月26日就「防火避 難設施」及「設備安全」項目檢查合格。續依彰化 縣政府於110年11月3日提出「彰化縣喬友大樓火災 事件」行政調查報告,營業場所停止營業部分,營 業所依現況認定為停止營業者,免辦理建築物公共 安全申報。本案喬友大樓2、3、4樓閒置情形依規
46
定免辦理建築物公共安全檢查。 (二)本案發生後,對於複合式大樓內閒置空間應否辦理 建築物公共安全檢查申報,據內政部查復,按建築 法第77條已課予建築物所有權人、使用人應維護建 築物構造及設備安全之責任,不因停(歇)業而免 因停(歇)業而免 除,是故供公眾使用建築物(非供公眾使用經內政 部指定者亦同)縱屬停(歇)業狀態,仍應持續辦 態,仍應持續辦 理公共安全檢查申報,申報類組依下列說明辦理: (一)現場仍在使用者,依現況用途類組申報。(二) 已停(歇)業者且有申報紀錄,以該場所最後一次 ,以該場所最後一次 申報類組認定之。(三)從未有申報紀錄者,依使 者,依使 用執照或最近一次變更使用執照登載用途認定 之。二、未依規定辦理者,依建築法第91條處建築 物所有權人、使用人新臺幣(下同)6萬元以上30 萬元以下罰鍰,並限期改善或補辦手續,屆期仍未 改善或補辦手續而繼續使用者,得連續處罰,並限 期停止其使用。 (三)惟查,本案發生後,於110年10月14日清晨高雄市鹽 埕區城中城火災事件,高雄市政府於110年10月29 日提出「高雄市鹽埕區城中城火災事件之行政調查 報告」(第15頁)指出:「至於營業場所部分,經洽 詢其他直轄市政府執行公安申報案件,營業場所依 現況認定為停止營業者,免辦理公安申報。」顯然 對於大樓內閒置廢棄空間,中央及地方主管建築機 關認定不一,因而對於該大樓2、3、4樓因閒置而 未辦理建築物公共安全檢查疑義,再函詢其他各直 轄市、縣市政府 27於本案事件前,應否辦理建築物 公共安全檢查申報等情,未有地方主管機關查復認
27 彰化縣政府、高雄市政府除外。
47
為複合式大樓閒置空間應辦理公安檢查申報。 (四)再查,依內政部災調報告改善建議項目,首項即要 求「強化建築管理:清查列管轄內老舊危險且有停 業閒置空間之供公眾使用建築物,並規範停業閒置 空間之建築物公共安全檢查機制」,其理由如下: 1、查建築法第77條、第77條之1、第77條之2雖有規 範建築物所有權人及使用人應維護建築物合法 使用與其構造及設備安全,直轄市、縣(市)主 管建築機關對於建築物得隨時派員檢查其有關 公共安全與公共衛生之構造與設備,以及相關公 安檢查簽證申報及複查等規定,但對於整棟供公 眾使用建築物內同時存在營業及停業閒置空間 之狀況,現況僅針對營業中之場所執行建築物公 共安全檢查,未就停業閒置空間執行檢查及管 理。 2、如本案喬友百貨舊大樓,由於整棟供公眾使用建 築物內設置有直通樓梯、安全梯或特別安全梯、 防火門、垂直昇降機及貫穿樓板之管道間(維修 門)等「防火避難設施」,當防火之垂直區劃與 各樓層區劃遭受破壞,火災發生時,火煙會擴散 蔓延,故專業檢查時應將整棟供公眾使用建築物 公共安全檢查列為整體申報之範圍及檢查(變更 使用審(勘)查作業時亦同),以確保建築物各 樓層水平、垂直區劃之完整及整體避難逃生安 、垂直區劃之完整及整體避難逃生安 全。 3、爰此,建議各直轄市政府及縣(市)政府應清查 列管轄內同時存在營業及停業閒置空間之供公 眾使用建築物,並規範該等建築物公共安全檢查 簽證頻率及申報期限,以強化安全管理。 (五)依上可知,本案發生前,整棟供公眾使用建築物內
48
同時存在營業及停業閒置空間之狀況,本案發生前 未就停業閒置空間執行檢查及管理。至本案及高雄 市城中城大樓大火事件發生後,內政部已加強建築 物共用部分之安全梯(含防火門)、昇降機間區劃、 垂直貫穿樓地板之管道間及其他類似部分區劃等 之公共安全檢查及管理。 (六)營建署就本案執行面提出下列作為: 1、為強化公共安全,擬具公寓大廈管理條例修正草 案,不論屬條例施行前興建或為條例施行後興 論屬條例施行前興建或為條例施行後興 建,涉及公共安全疑慮者均應限期成立管理委員 會或推選管理負責人,以進行相關公共安全事項 之辦理,確保居住品質,如未限期成立,將予以 裁罰。本案已於110年10月22日陳報行政院審 查,並由行政院於11月2日、11月16日召會研商, 將儘速送請立法院審議,以促進國內整體公寓大 廈公共安全與居住品質。 2、110年10月15日函知各地方政府針對前開場所即 刻啟動全面清查盤點,加強公共安全檢查並針對 不 合格場所列管追蹤依期改善,以維護建築物公 合格場所列管追蹤依期改善,以維護建築物公 共安全、保障民眾生命財產。 (七)消防署分析近年彰化喬友大樓等火災案件,人員傷 亡主要原因包括複合用途建築物低樓層發生火 災,因防火區劃或防火門破壞煙熱向上蔓延,造成 高樓層人員避難逃生困難,管理權人或防火管理人 未維護建築物合法使用與構造設備安全、未落實執 行通報、避難疏散等,爰為強化建築物消防安全管 理及場所自主防救災能力,茲將法令、制度及執行 面策進作為摘陳如下: 1、修正消防法:為強化複合用途建築物共同防火管 理及整體避難訓練,消防署業研修消防法, ,消防署業研修消防法,針對
49
有2個以上場所且其管理權有分屬之特定建築 物,要求應實施建築物共有部分防火管理及整體 避難訓練等共同防火管理事項,以提升整棟建築 等共同防火管理事項,以提升整棟建築 物火災預防管理及應變能力,另亦提升妨礙消防 安全檢查等之罰鍰額度,修正草案業陳報行政院 審查後,送請立法院審議,以保障民眾居住安全。 2、推動消防設備人員法立法:消防安全設備之設計 及性能維護之良否,攸關建築物發生火災時之偵 知、滅火及人員逃生等安全事項,亟需推動建立 消防專技人員管理專法,且完善消防專技人員之 管理,有效確保公共場所消防安全設備能維持正 常運作,亦有助提升場所消防安全,消防署已提 具消防設備人員法草案,並送立法院審議,將持 續與各界溝通說明,以期早日完成立法。 3、立即通函全面清查全國防疫旅館之消防安全管 理:消防署業分別於110年7月2日及110年7月8日 請各消防機關加強防疫旅館之消防安全檢查,違 規者依消防法相關規定處理,並通知防疫主管機 關,以預防火災發生。 (八)綜上,喬友大樓2、3、4樓屬停業閒置空間,於火災 發生前未執行建築物公共安全檢查,其防火區劃遭 受破壞,致火煙擴散蔓延而影響避難逃生安全。針 對是類複合式大樓內閒置空間應否辦理建築物公 共安全檢查申報,內政部於本案發生後雖稱,建築 法第77條已課予建築物所有權人、使用人應維護建 築物構造及設備安全之責任,不因停(歇)業而免 因停(歇)業而免 除,是故供公眾使用建築物(非供公眾使用經內政 部指定者亦同)縱屬停(歇)業狀態,仍應持續辦 態,仍應持續辦 理公共安全檢查申報。然據本院調查於本案發生 前,各地方主管建築機關於執行實務上均未要求類
50
此停業閒置空間應辦理建築物公共安全檢查,顯然 對於大樓內閒置廢棄空間,中央及地方主管建築機 關認定不一。值此事件後,內政部已檢討並要求整 棟供公眾使用建築物公共安全檢查列為整體申報 之範圍及檢查。此外該部營建署亦擬具公寓大廈管 理條例修正草案,涉及公共安全疑慮者均應限期成 立管理委員會或推選管理負責人,以進行相關公共 安全事項之辦理,如未限期成立,將予以裁罰。另 消防署分析近年彰化喬友大樓等火災案件,人員傷 亡係管理權人或防火管理人未維護建築物合法使 用與構造設備安全、未落實執行通報、避難疏散 等,為強化建築物消防安全管理及場所自主防救災 能力,刻正提出修正消防法、推動消防設備人員法 立法,另並通函全面清查全國防疫旅館之消防安全 管理。行政院應積極督同內政部及各地方主管機關 落實辦理,並推動相關法令修改進度,俾從制度面 消弭危害公共安全風險因子。
七、104年迄今我國消防人員於執行救災勤務時,因公殉 職人數已達17人 28,顯見消防員工作具高度危險性且 須 承受高度心理壓力 承受高度心理壓力,其性質及勤務有別於一般公務 人員,故歷來遭逢重大火災事件時,迭有開放消防員 組織工會之呼聲。而消防制度改善須納入第一線基層 納入第一線基層 聲音,方得確保制度調整確實符合其需求,以同時保 障基層人員工作安全。消防員組織工會涉及跨部會法 令修訂,仍待凝聚社會各界共識,行政院於法令修正 前,應督同內政部正視基層消防員訴求,非僅重申既
28 摘錄自維基百科 自維基百科:臺灣殉職消防人員列表 https://zh.m.wikipedia.org/zh-tw/%E8%87%BA%E7%81%A3%E6%AE%89%E8%81%B7%E6%B6%88%E 9%98%B2%E4%BA%BA%E5%93%A1%E5%88%97%E8%A1%A8。
51
有溝通管道。近年來諸多重大火災事件中,消防員工 作權益促進會仍持續不斷出面訴求基層消防人員權 益,該部應重新檢討並建立制度性有效溝通管道,確 實保障消防人員權益。另並參照本案內政部災調報告 改善建議,積極研議「消防人員創傷後壓力症候群 (PTSD)之諮詢與診治」制度,建立消防人員支持體 系以確保救災人員心理健康。 (一)按工會法(110年4月8日)第4條 29規定:「(第1項) 勞工均有組織及加入工會之權利。 。(第2項)現役軍 人與國防部所屬及依法監督之軍火工業員工,不得 組織工會;軍火工業之範圍,由中央主管機關會同 國防部定之。(第3項)教師得依本法組織及加入工 會。(第4項)各級政府機關及公立學校公務人員之 結社組織,依其他法律之規定。」 (二)經查,勞動部前於106年召開「公務人員籌組工會之 可行性評估研商會議」,因該議題涉及不同機關權 責,故該部邀請銓敘部、行政院人事總處、消防署、 內政部警政署、中華民國全國公務人員協會、台灣 警察工作權益推動協會、中華民國消防員工作權益 促進會(下稱消促會)及專家學者,就公務人員籌 組工會可能之影響、執行上的困難、針對公務員籌
29該修正條文行政院立法說明如下:(1)勞工團結權為勞動三權之首,對於勞動條件之確保及 提升至為重要,爰參照「經濟社會文化權 利國際公約」、「公民與政治權利國際公約」及國際 國際公約」及國際 勞工組織(ILO)第87條公約等精神,增列第一項明定勞工皆有組織及加入工會之團結權。(2) 慮及國家安全,現役軍人之團結權,目前仍宜予以限制;至於軍火工業部分,則僅於國防所 屬及依法監督者方予限制(其中所謂「依法監督」,係考慮該部所屬中山科學研究院未來有行 政法人化之可能,而一般民間軍火工業國防部並無監督權限),相關範圍乃授權中央主管機關 會同國防部定之,爰為第2項規定。(3)教師之團結權應與一般勞工同受保障,僅於工會組織 型態部分,宜考量其特殊性而於修正條文第6條另予限制,爰為第3項規定。(4) 至於公務人 員之結社自由,亦應給予保障,惟基於司法院歷次解釋,公務人員與國家間為「公法上職務 關係」,而勞工與雇主間為「私法上勞雇關係」,兩者顯有不同,各自形成一套完整之人事法 制體系;復以公務人員協會法業於91年7月10日公布,92年1月1日施行,公務人員之組織結社 應依該法之規範,爰為第4項規定。
52
組工會所欲達成之目的,於現行法令下可能之替代 方案等表示意見。依據會議討論之結論統整各方意 見,針對該議題提出4個建議方案:(1)修正公務人 員協會法,充實現行公務人員之團結權、協商權與 爭議權。(2)修正工會法,允許公務人員籌組工會。 (3)針對公務人員結社權另立新法。(4)維持現行法 制,惟具體改善工作條件。有關前開4個建議方案, 除建議2為勞動部權責事項外,另建議1、3、4為銓 敘部、內政部及行政院人事總處權責事項。勞動部 再於107年5月30日再次邀集相關機關召開「研商警 消人員籌組工會相關事宜會議」進行研商,達成共 識以:為完善警消人員之權益保障制度,各部會朝 向分階段規劃對警消人員結社與協商權益保障之 作為。109年1月21日賡續邀集相關部會研議,並做 成決議如下:「1.建議內政部視議題內容邀請警、 消同仁或相關權益團體參加並邀請勞動部、銓敘部 及行政院人事行政總處共同參與。至是否定期召開 會議,請內政部警政署及消防署於會後研議意見函 知勞動部。2.為回應警、消人員籌組工會之議題, 建議銓敘部研修公務人員協會法,針對是否開放籌 組專業性人員協會進行研議並聽取各界修正意 見。」 (三)本案發生後,勞動部表示於110年7月接獲消促會陳 情,其主要訴求為建立有效的溝通協商管道,俾能 將基層消防人員的意見直接有效地向所屬單位反 應,以保障消防人員之勞動權益。該部與消防署, 多次於立法院與該協會進行協商,針對保障消防員 之結社及協商權等勞動議題持續溝通。消防署、消 促會及該部皆同意朝建立對話溝通機制之方向繼 續研議,並先由消防署就現行消防員相關法制,盤
53
點得與消促會對話協商之議題。勞動部為完善工會 法制,自105年起辦理39場次「研商工會法修法座 談會」,社會各界對於是否開放公務人員組工會及 應如何保障公務人員勞動三權之作法仍未有共識。 (四)續以,勞動部查復,對於消防員所提勞動權益的保 障向為重視,因此持續與消防員相關團體(消促會) 進行溝通。消促會認為消防員所負責的救災勤務與 人民生命及財產有關,但因人力及救災設備配置有 不足、老舊之情形、人力不足導致的過長工作時間 (待命備勤),讓消防員執勤時處於不安全的景況, 以致罹難風險大增。以及現行消防行政體系,消防 員分別隸屬於中央(消防署)及各縣(市)政府之消 防局,惟因消防署、各縣(市)消防局間不相隸屬, 至各地消防員勞動條件、設備狀況不一,更增添消 防員反應意見之難度。是以,消促會希望能建立一 個直接、有效的管道,不論是工會、公務人員協會 或賦予消促會相關權限,只要能讓每一位基層消防 員的意見都能被重視,進而與政府進行協商、溝 通,達到保障消防員之權益的方式都可以接受。因 消防員前開主張涉多個權責單位主管事項,因此勞 動部除將協助消防人員相關團體與其他政府機關 持續溝通,讓消防人員的意見都能夠有效傳達外, 另外也會與相關單位進一步研議,在完善消防人員 相關權益及兼顧公共利益之前提下,研擬保障其結 益之前提下,研擬保障其結 社權、協商權之方案,以保障消防人員之權益。 (五)對此,消防署於本案發生後,就消防員溝通管道及 組織工會部分查復,消防人員得依「公務人員協會 法」規定,循體制組織及加入其所屬直轄市、縣(市) 政府之公務人員協會,經由所屬協會爭取維護其權 益、改善工作條件。為主動關懷及慰勉消防第一線
54
同仁,建立有效溝通機制並採納基層與具體性建 言,辦理「署長與地方消防同仁有約活動」,協助 民間熱心公益人士成立「臺灣消防發展與交流協 會」,以提升全體士氣,增進警義消及相關災害防 救志工的安全與福利 。 (六)然而,公務人員協會為各機關組織法規所定編制內 職務支領俸(薪)給之人員,對於消防員工作高壓 屬性及所須承受高度心理壓力, 承受高度心理壓力,其他人員未必對消 防員工作屬性能有全盤之體認,參照本案內政部災 調報告改善建議指出「建置消防人員創傷後壓力症 候群(PTSD)之諮詢與診治:消防人員在經歷重大 災害現場搶救,面對血肉模糊、屍首異處之悲慘現 場,倘心理調適不良,常會有精神或身體不適和緊 張,甚至會摧毀相關的事務,面對此一現象,必須 有專業心理諮詢人員,伴、安慰、照顧,必要時並 轉介醫院進行診療,讓其能順利走出生命陰暗的幽 走出生命陰暗的幽 谷。查本次初期救災20時06分由劉○○率4名同仁 從三民路側安全梯入室上樓安撫引導民眾,惟卻在 20時09分出現於三民路騎樓,未率同仁隊伍至7樓 執行任務,致上列同仁無幹部帶隊救災之情,查該 員似有創傷後壓力症候群徵狀,此問題應加以正 視。爰請所屬消防局平時應建立心理輔導及大型災 時應建立心理輔導及大型災 難後之心理諮商制度,並對於本次救災人員適時予 以協助提供心理諮商輔導,必要時轉介專業醫療院 所診治,以確保救災人員心理健康,遂行救災任 務。」等情以觀,是以,消防署仍重申既有溝通管 道,然若確已足供基層消防員反映表達意見並獲認 同,何須 消促會持續爭取權益,因此,消防署應檢 討改進。 (七)綜上,104年迄今我國消防人員於執行救災勤務時,
55
因公殉職人數已達17人,顯見消防員工作具高度危 險性且須 承受高度心理壓力,其性質及勤務有別於 承受高度心理壓力,其性質及勤務有別於 一般公務人員,故歷來遭逢重大火災事件時,迭有 開放消防員組織工會之呼聲。而消防制度改善須納 納 入第一線基層聲音,方得確保制度調整確實符合其 需求,以同時保障基層人員工作安全。消防員組織 工會涉及跨部會法令修訂,仍待凝聚社會各界共 識,行政院於法令修正前,應督同內政部正視基層 消防員訴求,非僅重申既有溝通管道。近年來諸多 重大火災事件中,消防員工作權益促進會仍持續不 斷出面訴求基層消防人員權益,該部應重新檢討並 建立制度性有效溝通管道,確實保障消防人員權 益。另並參照本案內政部災調報告改善建議,積極 研議「消防人員創傷後壓力症候群(PTSD)之諮詢 與診治」制度,建立消防人員支持體系以確保救災 人員心理健康。
56
參、處理辦法: 一、調查意見一、二,提案糾正彰化縣政府;函請彰化縣 政府議處相關失職人員見復。 二、調查意見三、四、五,函請彰化縣政府確實檢討改進 見復。 三、調查意見六、七,函請行政院督同內政部確實檢討改 進見復。 四、調查意見於審查後上網公布(遮隱個資),不另函復相 關陳訴人。 五、檢附派查函及相關附件,送請內政及族群委員會處理。
調查委員:葉大華、浦忠成
中華民國 1 1 1 年 7 月 1 9 日
FD06184 | 2021_台湾_高雄城中城大楼火灾_监察院纠正案文.pdf
分类:06_境外及港澳台调查报告 | 年份:2021 | 地域:台湾 | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
監察院糾正案件結案情形一覽表 115 年3 月 案號 被 糾 正 機 關 改 善 情 形 結案情形 111 內 正 25 ◆產生行政變革績效 1、高雄市政府辦理該市8 樓以上15 樓以下集合住宅(H-2 類組) 首次辦理公安申報經費補助實施計畫。 2、高雄市政府辦理補助老舊公寓大廈防火門修繕及更新實施計 畫。 3、內政部補助經費協助地方政府輔導成立管理組織。 ◆促成法令增修績效 高雄市政府於111 年4 月19 日公布實施「高雄市公寓大廈輔導管 理自治條例」,並於111 年5 月12 日及9 月8 日分期公告該市未 成立管理組織之社區應於1 年內應成立及完成報備。 內政及族群委員 會115.03.17 第6 屆第69 次會議決 議 : 糾正案結案 存查。
FD06185 | 2021_台湾_高雄城中城大楼火灾_监察院调查报告.pdf
分类:06_境外及港澳台调查报告 | 年份:2021 | 地域:台湾 | 严重程度: | 场所: | 起火原因: | 来源格式:pdf
監察院內政及族群委員會調查報告結案情形一覽表
報表編號:L0607 第1頁,共1頁 製表日期:114/03/10 案號 機關改善與處置情形 結案情形 111 內 調 59 ◆產生行政變革績效 1.高雄市政府地政局辦理「城中城暨七賢國中舊址跨區區段徵收」完成。 2.高雄市政府都市發展局辦理七賢安居社會住宅新建工程(預計117 年5 月完工)及城中城受災 戶協助安置工作。 3.高雄市政府都市發展局於災後進行周邊第一排老舊建物景觀改善工作,已完工驗收。 市發展局於災後進行周邊第一排老舊建物景觀改善工作,已完工驗收。 ◆促成法令增修績效 公寓大廈管理條例已於111 年5 月11 日修正公布增訂第29 條之1 及第49 條之1。 內政及族群委員會114.03.06 第 6 屆第57 次會議決議 : 結案存 查。
FD06186 | 2022_台湾_台中興中街住宅縱火6死_監察院糾正案文.pdf
分类:06_境外及港澳台调查报告 | 年份:2022 | 地域:台湾 | 严重程度: | 场所:住宅/民房 | 起火原因: | 来源格式:pdf
1
糾 正 案 文
壹、被糾正機關:臺中市政府。 貳、案 由:民國(下同)111年3月6日下午,臺中市中 區興中街1棟7層樓集合式住宅發生火警, 造成6死5傷之事件,經核臺中市政府都市 發展局未能掌握該建物早已作為住宿類 (H類)使用,且屬供公眾使用建築物,致未 要求所有權人應辦理建築物公共安全檢 查簽證及申報,輕忽建築物住宅安全管 理,且該府消防局於105年6月至110年4月 間5度就逃生通道擅設柵門、梯間堆置雜 物、直通樓梯堵塞等情進行通報,市府都 市發展局對110年4月27日之通報竟漏未 處理,致使本案公共區域堆置雜物且危及 建築物公共安全;又該建物於110年6月至 111年2月間陸續遭陳情有堆置雜物等違 規事項,市府都市發展局卻以未成立管理 委員會或管理負責人,致無法依公寓大廈 管理條例第36條規定要求其制止違規情 事,僅要求陳情人應提出證據並報轄區公 所處理,臺中市政府行事消極被動,確有 怠失,爰依法提案糾正。 參、事實與理由: 案經函請臺中市政府(下稱市府)提供相關卷證資 料,復經臺灣臺中地方檢察署(下稱臺中地檢署)檢察 官於111年5月6日偵查終結 1,認定該大樓鄭姓房客因所 飼養之寵物羊而屢次與莊姓房東發生爭吵,且遭房東要 求立刻搬離,其心生不滿故點燃放置在電梯口裝盛垃圾 刻搬離,其心生不滿故點燃放置在電梯口裝盛垃圾
1 臺中地檢署網站: https://www.tcc.moj.gov.tw/295804/295830/657577/956651/post。
2
之黑色塑膠袋,因該處走道、樓梯間堆置大量易燃雜物, 且樓梯間為建物各樓層間之垂直通道,故濃煙及火焰迅 速向上竄燒,致住戶傷亡,鄭姓房客及莊姓房東均已提 起公訴 2在案。後經本院於同年11月4日詢問市府都市發 展局、消防局、環境保護局等相關人員後調查發現,市 府都市發展局未能掌握該建物早已作為住宿類(H類)使 用,且屬供公眾使用建築物,致未要求所有權人應辦理 建築物公共安全檢查簽證及申報,且市府消防局5度就 逃生通道擅設柵門、梯間堆置雜物、直通樓梯堵塞等情 進行通報,市府都市發展局就110年4月27日之通報竟漏 未處理,致使本案公共區域堆置雜物且危及建築物公共 安全;又該建物於110年6月至111年2月間陸續遭陳情有 堆置雜物等違規事項,市府都市發展局卻以未成立管理 委員會或管理負責人,致無法依公寓大廈管理條例第36 條規定要求其制止違規情事,僅要求陳情人應提出證據 並報轄區公所處理,行事消極被動,確有怠失,應予糾 正促其注意改善。茲臚列事實與理由如下: 一、臺中市中區興中街1棟7層樓建物於111年3月6日下午 發生火災造成6死5傷事故,係因縱火造成傷亡並已起 訴相關人員。本案建築物所有權人有擅自違建與隔間 、變更使用及拆除1座安全梯等諸多違規事項,甚且本 建物早於101年已由臺中市政府消防局以寄宿舍列管 ,顯示斯時已作為住宿類(H類)使用,再依內政部107 年4月24日規定,本建物已屬供公眾使用建築物,然市 府都市發展局未能掌握並要求所有權人應辦理建築 物公共安全檢查簽證及申報,輕忽建築物住宅安全管
2 鄭姓房客涉犯刑法第271條第1項殺人、第271條第2項、第1項殺人未遂、第 人未遂、第173條第1項放 火燬現供人使用之住宅等罪嫌;莊姓房東涉犯廢棄物清理法第46條第3款之非法提供土地堆 置廢棄物、刑法第189條之2第1項後段、第2項前段之阻塞集合住宅逃生通道致死、第276條 過失致死及第284條前段之過失傷害等罪嫌。
3
理,僅於事發後方進行勘查確認並加以裁罰,已有怠 失。再者,本案市府消防局曾於105年6月16日、107年 1月22日、107年12月28日、108年1月29日、110年4月 27日5度就逃生通道擅設柵門、梯間堆置雜物、直通樓 梯堵塞等情進行通報,然市府對於105年5月20日通報 單查無辦理情形,尤以110年4月27日之通報竟漏未處 理,致使本案公共區域堆置雜物且危及建築物公共安 全,導致本案火災火勢迅速蔓延且逃生動線受阻,確 有怠失。 (一)按60年12月22日修正公布之建築法第73條 3規定:「 建築物非經領得使用執照,不准接水、接電、或申 准接水、接電、或申 請營業登記及使用;非經領得變更使用執照,不得 得 變更其使用。」92年6月5日修正(即現行條文)規定 :「(第1項)建築物非經領得使用執照,不准接水、 准接水、 接電及使用。但……。(第2項)建築物應依核定之使 用類組使用,其有變更使用類組或有第9條建造行 為以外主要構造、防火區劃、防火避難設施、消防 設備、停車空間及其他與原核定使用不合之變更 合之變更者 ,應申請變更使用執照。但建築物在一定規模以下 之使用變更,不在此限。 在此限。(第3項)前項一定規模以下 之免辦理變更使用執照相關規定,由直轄市、縣(市 )主管建築機關定之。(第4項)第2項建築物之使用 類組、變更使用之條件及程序等事項之辦法,由中 央主管建築機關定之。」同法第77條第3項規定:「 供公眾使用之建築物,應由建築物所有權人、使用 人定期委託中央主管建築機關認可之專業機構或
3 《建築法》係60年12月22日總統(60)台統(一)義字第839號令修正公布全文105條,92年6 月5日總統華總一義字第09200101200號令修正公布第3、7、10、11、34-1、36、41、53、 54、56、70-1、73、77-1、77-2、87、91、97、97-1、99條條文;增訂第77-3、77-4、 91-1、91-2、95-2、95-3、97-3條條文;刪除第90條條文。
4
人員檢查簽證,其檢查簽證結果應向當地主管建築 機關申報。非供公眾使用之建築物,經內政部認有 必要時亦同。」次按內政部107年4月24日台內營字 第1070803969號令:「一、集合住宅、住宅任一住宅 單位(戶)之任一樓層分間為6個以上使用單元(不 含客廳及餐廳)或設置10個以上床位之居室者,其 使用類組歸屬建築物使用類組及變更使用辦法第2 條所定H-1組,並屬建築法第5條所稱供公眾使用之 建築物。二、使用單元指住宅單位(戶)內具有門 扇及壁體之臥室、儲藏、廚房及其他類似高密度性 質之空間。」建築法第七十三條執行要點(85年8月 13日發布、93年9月16日廢止)則規定,建築物變更 使用,應以整層為之,並規定檢討項目、檢討標準 及免檢討情形,均有明文。 (二)有關臺中市中區興中街1棟7層樓建物,於111年3月 6日下午火災造成6死5傷事故,搶救災情形概要: 1、市府消防局於111年3月6日16時29分獲報火警, 轄區分隊率先到場時,整棟大樓幾乎每個樓層皆 已有火光或濃煙。 2、搶救過程使用雲梯車將受困6樓窗外的2名民眾 救下,同時因室內樓梯間與走道上有眾多雜物, 且延燒速度相當快,消防人員克服推進及延伸水 線的困難,盡全力壓制各樓層火勢。 3、後續除救出1名受困電梯民眾,另於不同樓層發 同樓層發 現6名OHCA 4住戶,全案共計6死5傷。 (三)本案建築物使用及變更使用情形: 1、本建築物於75年取得使用執照,86年申請變更為 旅館,100年10月13日起申請展延暫停營業,101
4 Out-of-hospital cardiac arrest,指患者在到院前心肺功能停止,但不代表宣判死亡。 代表宣判死亡。
5
年都市發展局配合觀光旅遊局辦理旅宿業聯合 稽查未發現該場所有使用用途不符之事項, 符之事項,及 104年市府稽查時現場未營業,後於108年廢止旅 館使用。 2、使用執照概要: (1)本案建築物(地址:中區興中街93號)於75年11 月8日取得(75)中工建使字第3445號使用執照, 各層用途為:地下層(用途:避難室、店鋪,面 積:157.08㎡);第一層(用途:店鋪、通道, 面積:126.78㎡);第二層(用途:集合住宅, 面積:147.92㎡);第三層(用途:集合住宅, 面積:147.92㎡);第四層(用途:集合住宅, 面積:147.92㎡);第五層(用途:集合住宅, 面積:147.92㎡);第六層(用途:集合住宅, 面積:147.92㎡);第七層(用途:集合住宅, 面積:147.92㎡);夾層(用途:集合住宅,面 積:22.49㎡)。 3、變更使用執照概要(如下表):本案86年1月25日 第42016號准予變更用途,原2樓(50.19㎡)、5樓 (147.92㎡)、6樓(147.92㎡)、7樓(147.92㎡)用 途集合住宅變更為旅館(B-4)面積合計為493.95 ㎡。
6
(四)本案建築物所有權人、使用人辦理建築物公共安全 檢查簽證及申報(下稱公安申報)情形: 1、旅館使用階段: (1)該大樓於86年申請變更為旅館使用,自87年作 為旅館使用建築物列管(列管名稱:印象興業股 份有限公司-印象大飯店),99年至107年旅館場 所向觀光旅遊局申請「停業」,至100年間展延 暫停營業、101年及104年稽查時現場未營業, 108年8月旅館辦理歇業。 (2)85年訂定發布建築物公共安全檢查簽證及申 報辦法後,據市府建築管理資訊系統,本案建 築物自87年始至98年有公安申報紀錄,皆准予 報備,惟當時係以紙本辦理申報,已逾公文保 存期限,已無相關申報資料。 (3)該旅館使用建築物於100年間停業至108年歇 業,依實際使用無須進行公安申報: 〈1〉按行政院90年8月29日台90內字第040248號 函修正「行政院維護公共安全方案-營建管理 使用執照號碼: 75 年11 月7 日(75)中工建使字第3445 號 變更使用執照: 86 年1 月25 日第42016 號准予變更 樓層 用途 面積 變更使用用途 變更使用用途面積 地下層
避難室、店鋪 157.08 ㎡
第一層 店鋪、通道 126.78 ㎡
第二層 集合住宅 147.92 ㎡ 集合住宅 97.73 ㎡ 旅館 50.19 ㎡ 第三層 集合住宅 147.92 ㎡
第四層 集合住宅 147.92 ㎡
第五層 集合住宅 147.92 ㎡ 旅館 147.92 ㎡ 第六層 集合住宅 147.92 ㎡ 旅館 147.92 ㎡ 第七層 集合住宅 147.92 ㎡ 旅館 147.92 ㎡ 夾層 集合住宅 22.49 ㎡ 7
部分」參、工作項目「五、推動建築物公共 安全檢查簽證及申報制度:……(伍)清查建 築物公共安全檢查應申報件數資料,剔除已 歇業或變更之案件,以確保申報資料之正確 性」。 〈2〉次按內政部90年11月5日(90)台內營字第 9067089號「關於建築物於申報公共安全期間 辦理停業登記在案,是否適用『建築物公共 安全檢查簽證及申報辦法』相關規定」函釋 :「所詢建築物於申報公共安全期間辦理停 業登記在案,是否適用『建築物公共安全檢 查簽證及申報辦法』相關規定乙節,查建築 法第77條第3項規定:『供公眾使用之建築物 ,應由建築物所有人、使用人定期委託中央 主管建築機關認可之專業機構或人員檢查簽 證,其檢查簽證結果應向當地主管建築機關 申報。非供公眾使用之建築物,經內政部認 有必要時亦同。』上開規定所稱供公眾使用 之建築物,係指實際有供公眾使用事實之建 築物而言,尚非僅憑是否辦理營業登記或停 業登記為據,請貴府依實際使用狀況逕予認 定核處。」 〈3〉再按內政部營建署92年6月23日營署建管字 第0920035205號函:「……三、本案已實際使 用場所之建築物應維護合法使用與其構造及 設備安全,並依規定辦理建築物公共安全檢 查簽證及申報,建築法第77條業有明定,建 築物所有權人、使用人未依上開法條規定維 護建築物合法使用與其構造及設備安全或辦 理建築物公共安全檢查簽證申報者,建築法
8
第91條各款已有處罰之規定。」 〈4〉另按建築物公共安全檢查簽證及申報辦法 第6條規定:「標準檢查專業機構或專業人員 應依防火避難設施及設備安全標準檢查簽證 項目表(如附表二)辦理檢查,並將標準檢 查簽證結果製成標準檢查報告書。」,附表二 備註內容「一、辦理建築物防火避難設施及 設備安全標準檢查之各檢查項目,應按實際 現況用途檢查簽證及申報。」 〈5〉綜上,該辦法所稱應辦理申報之供公眾使用 建築物,係指實際有供公眾使用事實之建築 物,倘場所閒置未使用或停業,自無應辦理 申報規定之適用。據此,該大樓99年至107年 旅館場所向觀光旅遊局申請「停業」,100年 間暫停營業,於108年8月旅館辦理歇業,期 間無進行建築物公共安全申報。 2、擅自變更住宅套房(H-1類組)階段: (1)查建築物使用類組及變更使用辦法第2條第2 項規定「前項建築物之使用項目舉例如附表二 。」表列建築物使用項目無「套房出租」之使 用項目歸組。惟按內政部107年4月24日台內營 字第1070803969號令:「一、集合住宅、住宅任 一住宅單位(戶)之任一樓層分間為6個以上使 用單元(不含客廳及餐廳)或設置 含客廳及餐廳)或設置10個以上床 位之居室者,其使用類組歸屬建築物使用類組 及變更使用辦法第2條所定H-1組,並屬建築法 第5條所稱供公眾使用之建築物。……」,倘符 合上開號令條件,即歸屬為H-1類組,並應依規 定辦理公安申報。 (2)另該府依中央訂定之「加強建築物公共安全檢
9
查及取締要點」第2點規定:「直轄市、縣(市) 主管建築機關應集中人力,優先執行建築物公 共安全檢查簽證及申報業務……」,針對附表二 表列之加強執行檢查建築物使用類組使用項目 辦理公安聯合稽查作業,惟「套房出租」非屬 上開附表表列之營業場所,且無目的事業主管 機關,並無相關列管。 (3)本案現況作為住宅(H-1類組)使用,屬供公眾 使用建築物,市府以未辦理公安申報,違反建 築法第77條第3項規定依同法第91條第1項規定 ,處6萬元罰鍰。 (五)本案擅自變更用途及違反法令之範圍及內容: 1、市府都市發展局於111年3月8日現況勘查後,發 現此案擅自變更隔間,該建築物2樓到7樓及頂樓 違建共計41間房間,包括:原核准住宅3樓、4樓 各2間共4間,擅自變更為12間;原核准旅館2樓、 5樓、6樓、7樓共17間,擅自變更為24間;另頂樓 違章5間房間,本案建築物涉有以下違規情形: (1)擅自變更使用: 〈1〉使用用途:原核准用途為集合住宅(H-2類組 )、旅館(B-4類組),現場查有擅自變更隔間 且樓層隔間數達6個使用單元(不含客廳及餐 含客廳及餐 廳),按內政部107年4月24日台內營字第 1070803969號令:「一、集合住宅、住宅任一 住宅單位(戶)之任一樓層分間為6個以上使 用單元(不含客廳及餐廳)或設置 含客廳及餐廳)或設置10個以上 床位之居室者,其使用類組歸屬建築物使用 類組及變更使用辦法第2條所定H-1組,並屬 建築法第5條所稱供公眾使用之建築物。…… 」,即該場所應歸屬為H-1類組,涉及未經核
10
准擅自變更使用用途。 〈2〉防火避難設施:現場查獲拆除一座安全梯, 與原核准圖說不符。 符。 〈3〉上開擅自變更原核准使用用途、防火避難設 施,違反建築法第73條第2項規定依同法第91 條第1項規定,處新臺幣(下同)6萬元罰鍰 。 (2)未申請室內裝修許可:現況作為住宅(H-1類組 )使用,屬供公眾使用建築物,現場查有擅自變 更隔間,未經許可擅自室內裝修,違反建築法 第77條之2第1項規定依同法第95條之1第1項規 定,處6萬元罰鍰。 (3)未辦理建築物公共安全檢查簽證及申報(下稱 公安申報):現況作為住宅(H-1類組)使用,屬 供公眾使用建築物,未辦理公安申報,違反建 築法第77條第3項規定依同法第91條第1項規定 ,處6萬元罰鍰。 2、本案違反規定及項目情形(如下表),該府都市發 展局按建築法不同罰則分別罰緩 同罰則分別罰緩6萬元,每戶共 處罰18萬元罰鍰。全案8戶共裁處所有權人(房東 )計144萬元罰鍰。 本案建築物樓層擅自變更統計表(111年3月8日現況調查) 樓層/原用途 房間數調查 擅自變更情形 最後 現況 調 查 用途類組變更 室內裝修 變更 構造 變 更 RF 屋突 0 5 (違建) (違建) 拆除 7F 旅館 5 6 變更住宅使用(H1) 變更隔間 6F 5 6 變更住宅使用(H1) 變更隔間 5F 5 6 變更住宅使用(H1) 變更隔間 4F 2 6 變更住宅使用(H1) 變更隔間
11
樓層/原用途 房間數調查 擅自變更情形 最後 現況 調 查 用途類組變更 室內裝修 變更 構造 變 更 3F 住宅 2 6 變更住宅使用(H1) 變更隔間 梯 2F 旅館 2 2
變更住宅使用(H1)
住宅 2 4 變更隔間 1F 0 0 防火區劃破壞 (93號與99號間防
火區劃牆破壞)
總計 23 41
本案建築物違反規定與項目列表 違反規定 違規項目 建築法第73條第2項規定:「建築物應依 核定之使用類組使用,其有變更使用類 組或有第9條建造行為以外主要構造、防 火區劃、防火避難設施、消防設備、停車 空間及其他與原核定使用不合之變更 合之變更 者,應申請變更使用執照。……」 現場查有擅自變更隔間且樓層隔間數達 6個使用單元(不含客廳及餐廳),按內 含客廳及餐廳),按內 政部107 年4 月24 日台內營字第 1070803969號令:「一、集合住宅、住宅 任一住宅單位(戶)之任一樓層分間為6 個以上使用單元(不含客廳及餐廳)或 含客廳及餐廳)或 設置10個以上床位之居室者,其使用類 組歸屬建築物使用類組及變更使用辦法 第2條所定H-1組,並屬建築法第5條所稱 供公眾使用之建築物。……」,即該場所 應歸屬為H-1類組,涉及未經核准擅自變 更使用用途。
- 擅自變更使用:2 樓至7 樓,
各樓層均變更隔間達6 個 使用單元(出租套房),原用 途住宅(H2)、旅館(B4),擅 自變更為住宅(H1)使用。
- 防火區劃破壞:現況發現
93 號(本案建物)與99 號 (鄰棟建物)間於一樓防火 區劃牆破壞開口。
- 擅自拆除一座安全梯:經比
對圖說,原安全梯位置,各 層樓變更為房間使用。 建築法第77條之2第1項第1款規定:「供 公眾使用建築物之室內裝修應申請審查 許可,非供公眾使用建築物,經內政部 擅自變更室內裝修:原住宅6間 變更為16間、原旅館範圍17間 變更為20間。
12
認有必要時,亦同。但中央主管機關得 授權建築師公會或其他相關專業技術團 體審查。」 建築法第77條第3項規定: 「供公眾使用之建築物,應由建築物所 有權人、使用人定期委託中央主管建築 機關認可之專業機構或人員檢查簽證, 其檢查簽證結果應向當地主管建築機關 申報。非供公眾使用之建築物,經內政 部認有必要時亦同。」 未辦理公安申報:各樓層均變 更隔間達6個使用單元(出租套 房),原用途住宅(H2)、旅館 (B4),擅自變更為住宅(H1)使 用,屬供公眾使用建築物。 違章建築管理辦法 頂樓加蓋違建:業已違章查報、 已拆除。 公寓大廈管理條例第16條第2項:「住戶 不 得於私設通路、防火間隔、防火巷 得於私設通路、防火間隔、防火巷 弄、開放空間、退縮空地、樓梯間、 共同走廊、防空避難設備等處所堆置 雜物、設置柵欄、門扇或營業使用, 或違規設置廣告物或私設路障及停 車位侵占巷道妨礙出入。… … 」 堆置雜物:本建築物各樓層走 廊、共用通道、樓梯現況均有堆 積大量雜物之痕跡。 雜物之痕跡。 辦理情形:107及108年已依程 序改善完成在案,另110及111 年案件尚未由公所提報違規人 處分資料予都市發展局住宅處 續處,故尚未進入都市發展局 住宅處辦理階段。
(二)然本建物早於101年已由市府消防局以寄宿舍列管, 顯示斯時已作為住宅使用,又鑑於106年11月23日 新北市中和區發生出租套房火災9死2傷及同年12 月5日臺北市八德路再發生出租雅房火災1死之慘 劇,因皆為非供公眾使用之建築物,於集合住宅、 住宅(H-2類組)居室內分間多戶出租,並使用非耐 燃材料隔間,一旦失火即造成之重大傷亡,為保障 租屋民眾居住安全,避免類似慘劇再發生,內政部 再於110年2月23日內授營建管字第1100802961號 通函各主管建築機關,重申該部於107年4月24日台 內營字第1070803969號令針對集合住宅、住宅任一 住宅單位(戶)之任一樓層分間為6個以上使用單元
13
(不含客廳及餐廳)或設置 含客廳及餐廳)或設置10個以上床位之居室者 ,其使用類組歸屬建築物使用類組及變更使用辦法 第2條所定「H-1」組,並屬建築法第5條所稱供公眾 使用之建築物,並依樓地板面積須每2年或4年辦理 建築物公共安全檢查簽證及申報,以強化高密度使 用集合住宅及住宅安全管理。然市府都市發展局未 能掌握並要求本案所有權人應辦理建築物公共安 全檢查簽證及申報,輕忽建築物住宅安全管理,僅 於事發後方進行勘查確認並加以裁罰,已有怠失。 (三)續查,本案走道及樓梯間等公共區域堆置雜物,市 府消防局曾於105年6月16日、107年1月22日、107年 12月28日、108年1月29日、110年4月27日5度就逃生 通道、直通樓梯堵塞等情進行通報,惟市府都市發 展局對於105年5月20日通報單查無辦理情形、110 年4月27日之通報漏未處理: 1、按消防機關應協助查報之相關規定,如下: (1)原「消防機關辦理消防安全檢查注意事項」第 2點第1款第8目:發現有逃生通道堵塞,防火門 、安全梯堵塞及防火區劃破壞或拆除等違規情 事,應協助通報目的事業主管機關處理,並彙 整查報清冊提報地方政府首長主持之公共安全 會報或治安會報處置(內政部消防署業於110年 12月23日修法刪除)。 (2)「加強建築物公共安全檢查及取締執行要點」 (100年10月7日修正)第6點:消防單位執行消防 檢查時,發現建築物防火避難設施等有不符規 符規 定之公共安全事項,應即時通報各目的事業主 管機關及建築主管機關處理,通報內容包括逃 生通道、安全梯、安全門是否堵塞及防火區劃 是否破壞。
14
展局依權責卓處,該府都市發展局辦理情形如下 表所示: 消防局通報日期 通報事項 都市發展局辦理情形 105.5.20通報單 (105.6.16 中市 消 預 字 第 1050029087 號函 發文通報)
- 5 樓及9 樓(實際為8 樓)安
全梯擅設柵門。
- 3 樓梯間堆積雜物。
- 9 樓(實際為8 樓)逃生通道
阻塞。 本案收文後於105年6 月20日已便簽分案由 科內各轄區辦理。 惟查無本件查報單轄 區同仁辦理情形。 107.1.15通報單 (107.1.22 中市 消 預 字 第 1070003959 號 函發文通報)
- 1 樓出入口防火牆(門)擅自
變更或改造。
- 頂樓擅搭違建物。
- 2 樓逃生通道阻塞。
- 4 樓逃生通道及安全梯擅設
柵門。
- 7 樓安全梯擅設柵門。
該局使用管理科已於 107年1月26日便簽移 請市府住宅處續辦,該 處表示107年1月22日 通報單已因陳情案件 依前開公告程序辦理。 107.12.4通報單 (107.12.28 中市 消 預 字 第 1070068196 號函 發文通報)
- 7 樓安全梯擅設柵門。
- 6 樓逃生通道堆積雜物。
- 4 樓逃生通道及安全梯擅設
柵門。
- 2 樓逃生通道及梯間堆積雜
物。
- 1 樓逃生通道堆積雜物。
(1)逃生通道堵塞、擅 設柵門部分:108年1月 3日就案內涉公寓大廈 管理違規事項會簽市 府住宅處本權責辦理, 該處表示經違規人於 108年1月11日陳述意 見並檢附照片已改善, 據以結案。 (2)擅自變更1樓防火 區劃部分及逃生通道 堵塞部份:因同時期有 接獲陳情案件,已啟動 辦理程序,並追蹤至改 善完成恢復原狀,108 年4月17日中市都管字 第1080057223 號函收 悉。 108.1.7通報單 (108.1.29 中市 消 預 字 第 1080005742 號 函發文通報)
- 1 樓逃生通道堵塞。
- 地下1 樓避難室逃生通道堵
塞。 110.3.23通報單 (110.4.27 中市 消 預 字 第 1100023220 號 函發文通報)
- 8 樓逃生通道堆積雜物安全
梯擅設柵門。
- 7 樓安全梯擅設柵門堆積雜
物。
- 6 樓逃生通道堆積雜物。
- 5、4、3 樓逃生通道堆積雜
物及安全梯擅設柵門。
- 1 樓往2 樓梯間堆積雜物。
本案收文後於110年4 月28日已便簽分案由 科內各轄區辦理。 惟查無本件查報單轄 區同仁辦理情形(未移 請住宅處公寓大廈管 理科依分工權責續 處。)
15
消防局通報日期 通報事項 都市發展局辦理情形
- 1 樓往地下1 樓梯間堆積雜
物。
- 1 樓逃生通道堆積雜物。
日、107年12月28日、108年1月29日、110年4月27 日5度就堆置雜物堵塞逃生通道、直通樓梯堵塞 等情進行通報,惟市府都市發展局於110年4月27 日之通報未確實辦理消防局消防安檢通報單案 件之查處及追蹤作業,處事失當,案經本院調查 後,該府業已就都市發展局使用管理科科長及股 長,以未確實督導所屬辦理消防局消防安檢通報 單案件之追蹤查處作業,督導不周,依臺中市政 周,依臺中市政 府及所屬各機關學校公務人員平時獎懲案件處 理要點第5點第3款第3目規定,各核予申誡1次之 處分,另都市發展局承辦人(助理工程員)以未確 實辦理消防局消防安檢通報單案件之查處及追 蹤作業,處事失當,依臺中市政府及所屬各機關 學校公務人員平時獎懲案件處理要點第5點第3 款第1目規定,核予申誡2次之處分。 (四)綜上,臺中市中區興中街1棟7層樓建物於111年3月 6日下午發生火災造成6死5傷事故,係因縱火造成 傷亡並已起訴相關人員。本案建築物所有權人有擅 自違建與隔間、變更使用及拆除1座安全梯等諸多 違規事項,甚且本建物早於101年已由市府消防局 以寄宿舍列管,顯示斯時已作為住宿類(H類)使用 ,再依內政部107年4月24日規定,本建物已屬供公 眾使用建築物,然市府都市發展局未能掌握並要求 所有權人應辦理建築物公共安全檢查簽證及申報, 輕忽建築物住宅安全管理,僅於事發後方進行勘查 確認並加以裁罰,已有怠失。再者,本案市府消防
16
局曾於105年6月16日、107年1月22日、107年12月28 日、108年1月29日、110年4月27日5度就逃生通道擅 設柵門、梯間堆置雜物、直通樓梯堵塞等情進行通 報,然市府對於105年5月20日通報單查無辦理情形 ,尤以110年4月27日之通報竟漏未處理,致使本案 公共區域堆置雜物且危及建築物公共安全,導致本 案火災火勢迅速蔓延且逃生動線受阻,確有怠失。 二、建築物所有權人、使用人應維護建築物合法使用與其 構造及設備安全為建築法第77條第1項所明示,然對 於集合住宅大樓之直通樓梯、逃生通道安全維護與管 理,影響公共安全甚鉅,政府有不可迴避之責任。本 可迴避之責任。本 案臺中市政府都市發展局僅待消防單位協助通報,然 該建物於110年6月23日、110年7月5日、110年12月28 日、111年2月23日陸續遭陳情有堆置雜物等違規事項 ,該局卻以未成立管理委員會或管理負責人,致無法 依公寓大廈管理條例第36條規定要求其制止違規情 事,僅要求陳情人應提出證據並報轄區公所處理,市 府行事消極被動,有悖建築法所揭示維護公共安全、 公寓大廈管理條例要求加強管理維護之責,確有怠失 。 (一)按建築法第77條第1項明定建築物所有權人、使用 人應負有維護建築物合法使用與其構造及設備安 全之責任。第2項前段明定直轄市、縣(市)(局)主管 建築機關「得」隨時派員檢查建築物公共安全與公 共衛生之構造與設備,係賦予主管機關裁量權限, 權限, 由主管機關自行決定是否採取檢查措施。第3項規 定供公眾使用之建築物應由所有權人、使用人定期 委託專業機構或人員定期檢查簽證,並辦理公安申 報,係在提醒民眾,自身的安全維護必須要從自我 管理開始做起,建築物所有權人、使用人應負有維
17
護建築物合法使用與其構造及設備安全之責任。次 按公寓大廈管理條例第1條、第16條第2項及第61條 規定:「為加強公寓大廈之管理維護,提昇居住品質 ,特制定本條例。」「住戶不得於私設通路、防火間 得於私設通路、防火間 隔、防火巷弄、開放空間、退縮空地、樓梯間、共 同走廊、防空避難設備等處所堆置雜物、設置柵欄 、門扇或營業使用,或違規設置廣告物或私設路障 及停車位侵占巷道妨礙出入。……」「第6條、第9條 、第15條、第16條、第20條、第25條、第28條、第 29條及第59條所定主管機關應處理事項,得委託或 委辦鄉(鎮、市、區)公所辦理。」 (二)本案建築物所有權人、使用人公安申報辦理情形已 於前述,而屋主於1樓公共區域堆置一般廢棄物,市 府執行強制清除作業及裁罰情形如下: 1、按廢棄物清理法,如於1樓公共區域堆置一般廢 棄物,環境保護局經接獲民眾反映或各區清潔隊 主動巡查發現堆置一般廢棄物或資源回收物於 公共區域(如道路側、騎樓)影響周邊公共衛生 案件時,均會優先勸導行為人,並要求限期改善 ,如經複查結果未改善,將依違反廢棄物清理法 第11條或第27條相關規定予以處分,並再次限期 改善;屆期倘仍未改善,則邀集里長、區公所及 警察局等單位辦理強制清除作業。 2、本案興中街93號屋主長期將撿拾之資源回收物 堆置於建物周遭,因屢次勸導未改善顯已影響公 次勸導未改善顯已影響公 共環境衛生,市府環境保護局(稽查大隊)近2年 已針對該屋主裁處24件,每次均以最高裁罰額度 裁罰6,000元,總計罰鍰金額14萬4,000元,因屋 主均未繳納罰鍰,已全數移送法務部行政執行署 ,經執行繳款金額共12件(7萬6,004元),剩餘12
18
件未繳部分,行政執行署將針對義務人發布執行 命令限期繳款,屆期未繳款,將逕行對其薪資或 財產所得進行扣繳。 3、本案市府環境保護局於自109年迄事發日,依現 場堆置情形共執行23次清除作業,並針對該大樓 每月執行清除2次,據該局說明,案址屋主長期撿 拾資源回收物堆置於1樓共同進出空間、騎樓及 防火巷等外部公共空間,市府環境保護局依現場 堆置情形平均每月辦理1-2次清除作業。本案件 屋主堆置之資源回收物經該局清除後,會再次撿 拾並堆置於1樓共同進出空間、騎樓及防火巷等 外部公共空間,因此該局針對公共區域(防火巷、 騎樓及1樓公共空間)定期派員巡檢。 4、市府環境保護局針對公共區域堆置廢棄(雜)物 影響環境衛生情事,皆依廢棄物清理法規定進行 查處及辦理強制清除作業,於執行強制清除作業 期間,屋主均將建物內1樓樓梯間入口之鐵門上 鎖,故無法得知建物內雜物堆置情形,且公共安 全危害認定非環境保護局之專業或權責。 (三)有關該大樓公寓大廈管理委員會成立及相關輔導部 分: 1、該大樓管理組織報備情形,該大樓(興中街93號) 領有該府75中工建使字第3445號使用執照,為公 寓大廈管理條例施行前已取得使用執照之建築 物,依使用執照所載戶數為8戶,依規定推選管理 負責人,需區分所有權人2人以上書面推選,經公 告10日後生效;惟現況建物所有權人均為莊姓屋 主(單一所有權人),餘住戶為房客,無成立管理 組織報備紀錄,故所有權人應善盡管理維護之責 。
19
之意願,係訂有「臺中市公寓大廈輔導暨推動公 寓大廈業務委外執行計畫案」(勞務採購案)可派 員至有需要之社區提供相關協助(輔導成立管理 組織),如有需要之社區得提出申請,並業於100 年4月7日發布「臺中市公寓大廈成立管理委員會 補助辦法」,以鼓勵公寓大廈依公寓大廈管理條 例成立管理委員會。市府住宅處依108年8月21日 、110年6月23日及110年7月5日陳情案件分別提 供輔導資訊予陳情人,惟未有申請輔導資源之紀 錄。 3、依公寓大廈管理條例第61條所規定,本案涉及同 條例第16條規定之主管機關應處理事項,得委託 或委辦鄉(鎮、市、區)公所辦理(市府住宅處係 依100年1月14日府授都住字第1000002115號函 檢送公告委託各轄區公所辦理在案)。市府住宅 處自108年起接獲人民陳情案件計有6件,其中雖 有改善完成紀錄,然110年後陸續仍有陳情,惟該 社區並未成立管理委員會或管理負責人,無法依 該條例第36條規定要求其制止違規情事,且因陳 情人陳情內容皆未提供照片等明確事證,因此市 府住宅處遂依該條例第59條規定請陳情人列舉 事實提出證據,再報請區公所辦理,處理過程皆 依程序辦理。 (四)市府於本案災後方提出相關檢討與策進作為: 1、落實案件之追蹤查處:另為避免再有疏漏情形發 生,並落實消防通報單案件之追蹤查處,加強各 科室橫向聯繫及案件進度管制,都市發展局已召 開會議討論決議各單位分工追蹤辦理方式,並建 置開發「消防通報單追蹤管理系統」,已正式上線
20
使用,後續將運用系統追蹤列管各單位辦理情形 。
建管字第1110805153號函釋:「……供公眾使用 建築物(非供公眾使用經內政部指定者亦)縱屬 停(歇)業狀態,仍應持續辦理公共安全檢查申報 ……」,已依法清查停歇業場所作業中,盤整後將 函請建築所有權人依規定辦理申報。 3、推動擴大建築物申報範圍:市府已於111年2月8 日公告並實施「8層以上未達16層」之建築物納入 申報範圍,並已於111年委託專業公會至現場輔 導,後續將於114年前公告臺中市「6層以上未達 8層」建築物之H-2組別建築物,自114年1月1日起 納入應辦理申報範圍。 4、公寓大廈管理條例所載之處理程序(管理委員會 、公所、住宅處),市府雖皆依法行政、辦理,惟 本案有流程有追蹤 不易之虞,案件恐隨時產生斷 之虞,案件恐隨時產生斷 鍊情形(如:管理委員會未制止違規人、陳情人 未檢具事實證據等),爰為補充既有流程之不足, 足, 市府住宅處已針對公寓大廈管理條例第16條規 定所涉及之樓梯間、共同走廊堆積雜物設置專案
21
,無論民眾是否有檢附相關事證,皆先函請公所 (依前開公告)或管理委員會(依該條例所賦予之 職責)先行協助查明,必要時得請陳情人領勘,協 助開門及指認物品地點及何人所有等。 5、爭取預算擴大輔導案資源、主動輔導,就該市已 公告112年擴大至8樓以上H-2類組應公安申報大 樓內尚未成立管理組織之社區,已爭取第二預備 金辦理「促進公寓大廈社區環境改善及提升居住 安全案」,續就該名單內社區及其他相類處所,專 案主動協助輔導成立管理組織。 (五)再查有關消防機關應協助查報之相關規定,據「加 強建築物公共安全檢查及取締執行要點」(100年10 月7日修正)第6點規定:「消防單位執行消防檢查時 ,發現建築物防火避難設施等有不符規定之公共安 符規定之公共安 全事項,應即時通報各目的事業主管機關及建築主 管機關處理,通報內容包括逃生通道、安全梯、安 全門是否堵塞及防火區劃是否破壞。」據此,如於 樓梯間等公共區域堆置雜物,消防單位執行消防檢 查時,發現建築物防火避難設施等有不符規定之公 符規定之公 共安全事項,應即時通報各目的事業主管機關及建 築主管機關處理,通報內容包括逃生通道、安全梯 、安全門是否堵塞及防火區劃是否破壞辦理等。又 本案市府消防局近3年曾經接過該處陳情4件,包含 逃生梯堆滿雜物、消防設施是否完善等情,該局業 已協助通報處理。惟對於集合住宅大樓之直通樓梯 、逃生通道安全維護與管理,影響公共安全甚鉅, 除建築物所有權人、使用人、管理權人平時之維護 與公安申報、消防安全設備檢修申報外,如於1樓公 共區域(如騎樓、防火巷等)堆置雜物尚有環境保 護局等單位遇有民眾檢舉可協助處理,如位於私人
22
場所建築物大樓內之樓梯間等難以逕行入內之場 所,僅能透過消防局通報包括逃生通道、安全梯、 安全門是否堵塞及防火區劃是否破壞等作為。而公 寓大廈管理條例明定住戶不得於樓梯間、共同走廊 得於樓梯間、共同走廊 等處所堆置雜物,然因該大樓未成立管理委員會或 推選管理負責人,致無從依該條例條規定要求其制 止違規情事,該府卻未能積極輔導成立,且該建物 於110年6月23日、110年7月5日、110年12月28日、 111年2月23日仍陸續遭陳情指出有堆置雜物等違 規事項,該局卻以未成立管理委員會或管理負責人 ,致無法依該條例第36條規定要求其制止違規情事 ,僅要求陳情人應提出證據並報轄區公所處理,市 府行事消極被動,有悖建築法所揭示維護公共安全 、公寓大廈管理條例要求加強管理維護之責,確有 怠失。
23
據上論結,臺中市政府都市發展局未能掌握該建物 早已作為住宿類(H類)使用,且屬供公眾使用建築物,致 未要求所有權人應辦理公安申報,且市府消防局5度就逃 生通道擅設柵門、梯間堆置雜物、直通樓梯堵塞等情進 行通報,市府都市發展局對110年4月27日之通報竟漏未 處理,致使本案公共區域堆置雜物且危及建築物公共安 全;又該建物於110年6月至111年2月間陸續遭陳情有堆 置雜物等違規事項,市府都市發展局卻以未成立管理委 員會或管理負責人,致無法依公寓大廈管理條例第36條 規定要求其制止違規情事,僅要求陳情人應提出證據並 報轄區公所處理,行事消極被動,確有怠失,爰依憲法 第97條第1項及監察法第24條之規定提案糾正,移送行政 院轉飭所屬確實檢討改善見復。 提案委員:葉宜津、林郁容
中 華 民 國 1 1 1 年 1 1 月 日
FD06187 | 2022_台湾_台中興中街住宅縱火6死_監察院調查報告.pdf
分类:06_境外及港澳台调查报告 | 年份:2022 | 地域:台湾 | 严重程度: | 场所:住宅/民房 | 起火原因: | 来源格式:pdf
監察院內政及族群委員會調查報告結案情形一覽表
報表編號:L0607 第1頁,共1頁 製表日期:114/03/20 案號 機關改善與處置情形 結案情形 111 內調0058 ◆產生行政變革績效 1.臺中市政府於111 年已建置「消防通報追蹤管理系統」執行控管類似案件 之通報。 2.內政部消防署督促各消防機關執行「加強建築物公共安全檢查及取締執行 要點」第6 點協助通報建築物件數,內政部國土管理署要求各建築主管機關 進行裁罰、陳訴意見及改善等作為 3.臺中市政府都市發展局已提出設置專案、提高消防設施(備)修繕意願、 爭取預算擴大輔導案資源及主動輔導、提高成立管理委員會誘因等4 大項等 作為。 內政及族群委員會114.03.06 第6 屆第 57 次會議決議 : 結案存查。
FD06188 | 2022_港澳台_香港_营口6·21BONNYISLAND_6·21_火灾_调查报告.md
分类:06_境外及港澳台调查报告 | 年份:2022 | 地域:香港 | 严重程度: | 场所: | 起火原因: | 来源格式:md
一、事故简况及调查情况
(一)事故简况。
2019 年 6 月 21 日 0725 时许, PACIFIC BASIN SHIPPING HK LIMITED 所属中国香港籍 散货船“ BONNY ISLAND 轮在营口港鲅鱼圈港区 62# 泊位机舱发生火灾,事故导致该轮 2# 发电机损毁、 3# 发电机过火部分部件损坏 且机舱内的部分消防 器材及部分电缆损坏 无人员伤亡,未造成海面污染,直接经济 损失约 330 万元人民币,构成一般等级水上交通事故。
(二)事故调查情况。
事故发生后,营口海事局成立了事故调查组对本次事故开展 2 调查。事故调查组通过调查、取证,并 调查。事故调查组通过调查、取证,并对取得证据的综合分析,对取得证据的综合分析,查明了事故经过,分析了事故原因,判明了事故责任。查明了事故经过,分析了事故原因,判明了事故责任。 ( (三三)) 专业术语和标准用语。专业术语和标准用语。 VHF VHF::Very High Frequency Very High Frequency 甚高频甚高频 ABS: American Bureau of Shipping ABS: American Bureau of Shipping美国船级社美国船级社 SOLAS: International Convention for Sa SOLAS: International Convention for Safety of Lifety of Life at Seafe at Sea 海海上人命安全公约上人命安全公约 MARPOL MARPOL: The Internatioanal C: The Internatioanal Convention For onvention For the Prevention the Prevention of Pollution From Shipsof Pollution From Ships 国际防止船舶造成污染公约国际防止船舶造成污染公约
二、调查取证情况
二、调查取证情况
(一)船舶概况。
(一)船舶概况。
船名 船名 BONNY ISLAND BONNY ISLAND 船籍港 船籍港 香港 香港 登记号码 登记号码 HK HK--38373837 船舶种类 船舶种类 散货船 散货船 船体材料 船体材料 钢质 钢质 总吨 总吨 32377 32377 净吨 净吨 19458 19458 总长 总长
185.78
185.78米米
型宽 型宽
32.36
32.36米米
型深 型深 18 18米米 主机类型 主机类型 内燃机一台 内燃机一台 主机型号 主机型号 MAN B&W 6S50MC MAN B&W 6S50MC--CC 主机功率 主机功率 8400 8400千瓦千瓦 螺旋桨 螺旋桨 1 1台台 航区 航区 无限 无限 造船地点 造船地点 浙江 浙江 造船厂 造船厂 常石集团(舟山)造船有限公司 常石集团(舟山)造船有限公司 龙骨安放日期 龙骨安放日期 2011 2011年年1212月月3131日日 IMO IMO编号编号 9610731 9610731 3 船舶所有人及地址 船舶所有人及地址 BONNY SHIPPING LIMITED BONNY SHIPPING LIMITED 31 31//FF,,ONE ISLAND SOUTHONE ISLAND SOUTH,,2 HEUNG YIP ROAD2 HEUNG YIP ROAD,,WONG CHUK HANGWONG CHUK HANG,,HONG KONGHONG KONG.. 船舶经营人及地址 船舶经营人及地址 PACIFIC BASIN SHIPPING PACIFIC BASIN SHIPPING ((HKHK)) LIMITEDLIMITED 31 31//FF,,ONE ISLAND SOUTHONE ISLAND SOUTH,,2 HEUNG YIP ROAD2 HEUNG YIP ROAD,,WONG CHUK WONG CHUK HANGHANG,,HONG KONGHONG KONG.. 船舶管理人及地址 船舶管理人及地址 PACIFIC BASIN SHIPPING PACIFIC BASIN SHIPPING ((HKHK)) LIMITEDLIMITED 31 31//FF,,ONE ISLAND SOUTHONE ISLAND SOUTH,,2 HEUNG YIP ROAD2 HEUNG YIP ROAD,,WONG CHUK HANGWONG CHUK HANG,,HONG KONGHONG KONG.. ( (二二))船舶状态。船舶状态。
1.
1.船舶机舱基本结构。船舶机舱基本结构。
该轮的基本结构自上而下顺序为驾驶甲板层、驾驶甲板上 该轮的基本结构自上而下顺序为驾驶甲板层、驾驶甲板上层、驾驶甲板下层、救生甲板层、主甲板层、机舱二层、机舱三层、驾驶甲板下层、救生甲板层、主甲板层、机舱二层、机舱三层、机舱底层。驾驶甲板下层及以下如下图:层、机舱底层。驾驶甲板下层及以下如下图: 4
2.
2.主机及主机及33台发电机的分布。台发电机的分布。
该轮的主机位于机舱底层,三台 该轮的主机位于机舱底层,三台柴油发电机位于机舱三层,柴油发电机位于机舱三层,其平面分布如下:其平面分布如下: 机舱三层 机舱三层 机舱底层 机舱底层 5
3.
3.发电机情况。发电机情况。
( (11)该轮共有)该轮共有33台同一型号的发电机台同一型号的发电机,,参数如下表参数如下表:: 柴油机型号 柴油机型号 DAIHATSU 6DC DAIHATSU 6DC--17Ae17Ae 输出功率、转速 输出功率、转速 610kwX900r.p.m 610kwX900r.p.m 缸数、缸径、冲程 缸数、缸径、冲程 6 X 170mmX270mm 6 X 170mmX270mm,,44冲程冲程 燃油种类 燃油种类 H.F.O H.F.O和和 D.OD.O,燃油压力应不超过,燃油压力应不超过1MPa1MPa 1# 1#发电机发电机 2# 2#发电机发电机 主机 主机 3# 3#发电机发电机 6 发电机型与生厂商 发电机型与生厂商 防滴、自通风式无刷机,生厂商: 防滴、自通风式无刷机,生厂商:TAIYOTAIYO 发电机参数 发电机参数 560kwX 900r.p.m 560kwX 900r.p.m,,700KVA700KVA,,AC450VAC450V,,60HZ60HZ,三相,三相 增压器型号与生 增压器型号与生产商产商 AT14 AT14,生厂商:,生厂商:TSUTSU 调速器型号与生产商 调速器型号与生产商 HYDRAULIC(RHD6 HYDRAULIC(RHD6--MC)MC),生产商:,生产商:BOSCHBOSCH 滑油冷却器 滑油冷却器 板式 板式 机带泵 机带泵 滑油泵:齿轮式,排量 滑油泵:齿轮式,排量20m20m33/h/h 高温淡水泵:离心式,排量 高温淡水泵:离心式,排量18m18m33/h/h 低温淡水泵:离心式,排量 低温淡水泵:离心式,排量18m18m33/h/h 燃油泵:齿轮泵 燃油泵:齿轮泵 滑油自吸泵 滑油自吸泵 电动驱动齿轮泵: 电动驱动齿轮泵:2.5m2.5m33/h X 0.94kw/h X 0.94kw ( (22))2#2#发电柴油机情况。发电柴油机情况。 该轮船员于 该轮船员于20192019年年44月月2222--2727日对该机进行了最近一次的日对该机进行了最近一次的大修检测,包括六个缸的汽缸盖、进排气阀及阀座、活塞环搭口大修检测,包括六个缸的汽缸盖、进排气阀及阀座、活塞环搭口与天地间隙、活塞销与天地间隙、活塞销直径、缸套圆柱度、连杆大端孔径及圆柱度直径、缸套圆柱度、连杆大端孔径及圆柱度等数据的测量,并对所有喷油器进行了校正,清洁了活塞,换新等数据的测量,并对所有喷油器进行了校正,清洁了活塞,换新了所有活塞环,并更换曲轴箱滑油。该轮保养符合其保养计划周了所有活塞环,并更换曲轴箱滑油。该轮保养符合其保养计划周期。期。 该轮每月主用一个发电机, 该轮每月主用一个发电机,33台发电机轮流使用,台发电机轮流使用,66月月11日,日,该轮启动该轮启动2#2#发电机并作为主用。事发前发电机并作为主用。事发前,,该机运行良好该机运行良好,,进油管进油管 7 的油压为 的油压为0.6MPa,0.6MPa,符合该轮发电机说明书注明的燃油压力应大符合该轮发电机说明书注明的燃油压力应大不超过不超过1.0MPa1.0MPa的要求。的要求。 ABS ABS于于20192019年年55月月88日在烟台港对该发电机及其基座、涡日在烟台港对该发电机及其基座、涡轮增压器进行了检验(保持船级),状态满意。轮增压器进行了检验(保持船级),状态满意。
4.
4.船舶消防设备。船舶消防设备。
( (11)该轮配备的主要消防设备。)该轮配备的主要消防设备。 消防 消防皮龙及消防喷头皮龙及消防喷头2424套、消防员装备套、消防员装备22套、便携式灭火套、便携式灭火器器6868具、水雾灭火系统及固定式具、水雾灭火系统及固定式COCO22灭火系统。灭火系统。 (2) (2)固定式固定式COCO22灭火系统。灭火系统。 该轮 该轮COCO22灭火系统共有灭火系统共有151151个钢瓶个钢瓶(55kg/(55kg/瓶瓶))组成,事发前,组成,事发前,该系统最近一次的检验由该系统最近一次的检验由Shanghai Safetec Marine Service Co., Shanghai Safetec Marine Service Co., LtdLtd于于20182018年年33月月2727日在大连进行,其后出具了证书和检验报日在大连进行,其后出具了证书和检验报告,证书编号:告,证书编号:20180001322018000132。。 事发后, 事发后,Shanghai Safetec Marine Service Co., LtdShanghai Safetec Marine Service Co., Ltd于于20192019年年77月月22日在鲅鱼圈对该轮部分日在鲅鱼圈对该轮部分消防设备进行了检验及充消防设备进行了检验及充装,并出具了证书和检验报告,证书编号:装,并出具了证书和检验报告,证书编号:00166380016638。。 ( (二二))船舶检验及安全情况。船舶检验及安全情况。 “ “BONNY ISLANDBONNY ISLAND””轮轮于于20192019年年55月月88日在烟台港由日在烟台港由ABSABS烟台办事处进行了年度检验,事发时该轮法定证书齐全有效。烟台办事处进行了年度检验,事发时该轮法定证书齐全有效。 该轮船级证书由 该轮船级证书由ABSABS于于20192019年年22月月2121日签发,有效期至日签发,有效期至 8 2023 2023年年66月月66日。日。 2019 2019年年22月月2727日,该轮在秘鲁接受港口国检查,结果为日,该轮在秘鲁接受港口国检查,结果为零零缺陷。缺陷。
(三)船员情况。
(三)船员情况。
本航次共配备船员 本航次共配备船员1919人人,,分别为船长、大副、二副、三副、分别为船长、大副、二副、三副、55名水手、名水手、22名甲板实习生、名甲板实习生、11名甲板见习生、轮机长、大管轮、名甲板见习生、轮机长、大管轮、二管轮、二管轮、22名名机工、机工、11名机舱见习生及名机舱见习生及11名厨师。该轮职务船员名厨师。该轮职务船员均持有所属国签发的适任证书和船旗国承认签证,其船员持证与均持有所属国签发的适任证书和船旗国承认签证,其船员持证与配员情况符合该轮最低安全配员证书的要求。配员情况符合该轮最低安全配员证书的要求。 船长 船长KOVALCHUKKOVALCHUK,男,乌克兰国籍,,男,乌克兰国籍,19751975年年99月月1818日出生,日出生,持有中国香港海事处持有中国香港海事处20192019年年55月月1414日签发的船长证书,有效期日签发的船长证书,有效期至至20242024年年44月月2323日。日。20192019年年66月月1010日在连云港登该轮任船长,日在连云港登该轮任船长,此为其第一次服务于该公司,其持有船长证书此为其第一次服务于该公司,其持有船长证书99年。年。 轮机长 轮机长LEGASPI MANUELLEGASPI MANUEL,男,菲律宾国籍,,男,菲律宾国籍,19701970年年88月月3030日出生,持有中国香港海事处日出生,持有中国香港海事处20172017年年11月月55日签发的轮机长证日签发的轮机长证书书,有效期至,有效期至20212021年年1212月月2929日。日。20192019年年33月登该轮任轮机长,月登该轮任轮机长,持有轮机长证书持有轮机长证书1515年。年。 大管轮 大管轮DUMLAO NEW YEAR GOYHADUMLAO NEW YEAR GOYHA,男,菲律宾国籍,,男,菲律宾国籍,19771977年年11月月11日出生,持有中国香港海事处日出生,持有中国香港海事处20172017年年44月月2525日签发的轮日签发的轮机长证书,有效期至机长证书,有效期至20212021年年1212月月2929日。日。20192019年年11月在连云港月在连云港 9 登该轮任二管轮, 登该轮任二管轮,33月月1414日升职为大管轮。日升职为大管轮。 二管轮 二管轮PADILLA EMMANUEL DULAPADILLA EMMANUEL DULA,男,菲律宾国籍,,男,菲律宾国籍,19661966年年55月月3131日出生,持有中国香港海事处日出生,持有中国香港海事处20172017年年11月月44日签发的轮日签发的轮机员证书机员证书,,有效期至有效期至20212021年年1010月月1313日。日。20201919年年33月登该轮任月登该轮任二管轮,事发时有二管轮,事发时有1212年的二管轮海上资历年的二管轮海上资历。。
(四)管理情况。
(四)管理情况。
1.
1.公司概况。公司概况。
PACIFIC BASIN SHIPPING PACIFIC BASIN SHIPPING ((HKHK)) LIMITEDLIMITED是该轮的经是该轮的经营人和管理人营人和管理人。至。至20182018年年55月,该公司运营月,该公司运营230230艘散货船,其艘散货船,其中中106106艘为自有,聘用船员艘为自有,聘用船员34003400名,岸基人员名,岸基人员330330名,贸易遍名,贸易遍布全球。布全球。
2.
2.安全管理体系建立及审核情况。安全管理体系建立及审核情况。
PACIFIC BASIN SHIPPING PACIFIC BASIN SHIPPING ((HKHK)) LIMITEDLIMITED公司成立于公司成立于20042004年,其第一份符合证明由劳氏船级社于年,其第一份符合证明由劳氏船级社于20052005年年11月月1414日日签发,该公司最新的符合证明签发,该公司最新的符合证明由挪由挪威船级社威船级社于于20182018年年1010月月1919日在香港签发,编号:日在香港签发,编号:n1215053n1215053--zjwzjw,有效期至,有效期至20232023年年1010月月1919日。日。 2018 2018年年66月月33日由日本船级社在智利为该轮签发安全管理日由日本船级社在智利为该轮签发安全管理证书,编号:证书,编号:18VP18VP--M0012SMCM0012SMC,有效期至,有效期至20232023年年66月月22日。日。
(五)其他调查情况。
(五)其他调查情况。
10
1.
1.燃油取样阀的购买、安装及更换情况。燃油取样阀的购买、安装及更换情况。
2019 2019年年55月,“月,“BONNY ISLANDBONNY ISLAND”轮的船舶管理人员于防城港”轮的船舶管理人员于防城港访船期间,鉴于访船期间,鉴于MARPOLMARPOL公约附则公约附则VIVI第第1414条条1.31.3的要求(全球的要求(全球0.50%0.50%低硫燃油标准实施)将于低硫燃油标准实施)将于20202020年年11月月11日生效实施日生效实施,,对船对船上使用燃油进行取样和上使用燃油进行取样和分析是验证船舶分析是验证船舶SOxSOx(硫氧化物)排放符(硫氧化物)排放符合性的一个重要方法,为此,船上燃油系统需要设置合适的取样合性的一个重要方法,为此,船上燃油系统需要设置合适的取样点以便于船上在用燃油的取样,于是其要求该轮查找适合的燃油点以便于船上在用燃油的取样,于是其要求该轮查找适合的燃油取样位置,并将该要求列入了留给船方的改进行动计划,要求船取样位置,并将该要求列入了留给船方的改进行动计划,要求船方于方于66月月3131日前完成。日前完成。 该轮轮机长于 该轮轮机长于20192019年年66月月33日日,,向公司申请物料,要求公司向公司申请物料,要求公司提供提供55个铜阀个铜阀,,每个阀两端均为外螺纹,分别为每个阀两端均为外螺纹,分别为PT1/2PT1/2和和PF1/2PF1/2,,PF1/2PF1/2端配有环形连接螺母,并在申请单上注明:端配有环形连接螺母,并在申请单上注明:55个阀能在温个阀能在温度度2020--100100℃情况下使用,可承受的最大压力为℃情况下使用,可承受的最大压力为3.43MPa3.43MPa,按照改,按照改进行动计划的要求,进行动计划的要求,55个阀将分别作个阀将分别作为主机、为主机、33台发电机、生活台发电机、生活污水处理设备的取样阀。其后,该轮收到污水处理设备的取样阀。其后,该轮收到55个铜阀,每个阀两端个铜阀,每个阀两端各配一接头(黄铜),其中一接头配有连接螺母(下各配一接头(黄铜),其中一接头配有连接螺母(下称上端接头,称上端接头,而未配螺母的接头下称下端接头),具体如下:而未配螺母的接头下称下端接头)
